Sample records for dec-supplied operating systems

  1. MAGSAT for geomagnetic studies over Indian region

    NASA Technical Reports Server (NTRS)

    Rastogi, R. G.; Bhargava, B. N.; Singh, B. P.; Rao, D. R. K.; Rangarajan, G. K.; Rajaram, R.; Roy, M.; Arora, B. R.; Seth, A. (Principal Investigator)

    1981-01-01

    Progress in the preparation of software for converting data tapes produced on an IBM system to data readable on a DEC-10 system, in the creation of awareness of the utility of MAGSAT data among users in India, and in making computer programs supplied by NASA operational on the DEC-10 system is reported. Papers presented to Indian users, at the IAGA fourth scientific assembly, at a symposium on interdisciplinary approaches to geomagnetism, and a paper published in Science Today are included.

  2. Analysis of electric power industry restructuring

    NASA Astrophysics Data System (ADS)

    Al-Agtash, Salem Yahya

    1998-10-01

    This thesis evaluates alternative structures of the electric power industry in a competitive environment. One structure is based on the principle of creating a mandatory power pool to foster competition and manage system economics. The structure is PoolCo (pool coordination). A second structure is based on the principle of allowing independent multilateral trading and decentralized market coordination. The structure is DecCo (decentralized coordination). The criteria I use to evaluate these two structures are: economic efficiency, system reliability and freedom of choice. Economic efficiency evaluation considers strategic behavior of individual generators as well as behavioral variations of different classes of consumers. A supply-function equilibria model is characterized for deriving bidding strategies of competing generators under PoolCo. It is shown that asymmetric equilibria can exist within the capacities of generators. An augmented Lagrangian approach is introduced to solve iteratively for global optimal operations schedules. Under DecCo, the process involves solving iteratively for system operations schedules. The schedules reflect generators strategic behavior and brokers' interactions for arranging profitable trades, allocating losses and managing network congestion. In the determination of PoolCo and DecCo operations schedules, overall costs of power generation (start-up and shut-down costs and availability of hydro electric power) as well as losses and costs of transmission network are considered. For system reliability evaluation, I examine the effect of PoolCo and DecCo operating conditions on the system security. Random component failure perturbations are generated to simulate the actual system behavior. This is done using Monte Carlo simulation. Freedom of choice evaluation accounts for schemes' beneficial opportunities and capabilities to respond to consumers expressed preferences. An IEEE 24-bus test system is used to illustrate the concepts developed for economic efficiency evaluation. The system was tested over two years time period. The results indicate 2.6684 and 2.7269 percent of efficiency loss on average for PoolCo and DecCo, respectively. These values, however, do not represent forecasts of efficiency losses of PoolCo- and DecCo-based competitive industries. Rather, they are illustrations of the efficiency losses for the given IEEE test system and based on the modeling assumptions underlying framework development.

  3. G3 Analysis. Volume 2. Appendixes.

    DTIC Science & Technology

    1985-12-01

    AA-8167 216 03 ANALYSIS VOLUME 2 &*PENDXES(U) COMBINED NUS V3 OPERATION RESEARCH ACTIVITY FORT LEAVENWORTH KS A 𔄀 S R RCCINELLI ET AL . DEC 95...Analytic tecnniques: DA, SIM, Al 3-15. AID DESCRIPTOR: Controlled Supply Rate ( CSR ) a. Product supported: OPORD (Service Support) D. Description...APPENOIXESCU) COMBINED ASKS 31P3 OPERATIONS RESEARCH ACTIVITY FORT LEAVENWORTH KS ACCINELLI ET AL . DEC 85 CAORA/TR-13/BS-YOL-2 UNCLASSIFIED F/B 15/7

  4. 76 FR 34192 - Commercial and Industrial Pumps

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-13

    ... 1999. The ADL analysis, ``Energy Consumption Characteristics of Commercial Building HVAC Systems... report for the United Nations (``Motor System Efficiency Supply Curves UNIDO,'' Dec. 2010),\\3\\ also used..., A. and A. Hasanbeigi, ``Motor Systems Efficiency Supply Curves,'' United Nations Industrial...

  5. Thermionic energy conversion technology - Present and future

    NASA Technical Reports Server (NTRS)

    Shimada, K.; Morris, J. F.

    1977-01-01

    Aerospace and terrestrial applications of thermionic direct energy conversion and advances in direct energy conversion (DEC) technology are surveyed. Electrode materials, the cesium plasma drop (the difference between the barrier index and the collector work function), DEC voltage/current characteristics, conversion efficiency, and operating temperatures are discussed. Attention is centered on nuclear reactor system thermionic DEC devices, for in-core or out-of-core operation. Thermionic fuel elements, the radiation shield, power conditions, and a waste heat rejection system are considered among the thermionic DEC system components. Terrestrial applications include topping power systems in fossil fuel and solar power generation.

  6. Band-to-band tunneling field effect transistor for low power logic and memory applications: Design, fabrication and characterization

    NASA Astrophysics Data System (ADS)

    Mookerjea, Saurabh A.

    Over the past decade the microprocessor clock frequency has hit a plateau. The main reason for this has been the inability to follow constant electric field scaling, which requires the transistor supply voltage to be scaled down as the transistor dimensions are reduced. Scaling the supply voltage down reduces the dynamic power quadratically but increases the static leakage power exponentially due to non-scalability of threshold voltage of the transistor, which is required to maintain the same ON state performance. This limitation in supply voltage scaling is directly related to MOSFET's (Metal Oxide Semiconductor Field Effect Transistor) sub-threshold slope (SS) limitation of 60 mV/dec at room temperature. Thus novel device design/materials are required that would allow the transistor to switch with sub-threshold slopes steeper than 60 mV/dec at room temperature, thus facilitating supply voltage scaling. Recently, a new class of devices known as super-steep slope (SS<60 mV/dec) transistors are under intense research for its potential to replace the ubiquitous MOSFET. The focus of this dissertation is on the design, fabrication and characterization of band-to-band tunneling field effect transistor (TFET) which belongs to the family of steep slope transistors. TFET with a gate modulated zener tunnel junction at the source allows sub-kT/q (sub-60 mV/dec at room temperature) sub-threshold slope (SS) device operation over a certain gate bias range near the off-state. This allows TFET to achieve much higher I ON-IOFF ratio over a specified gate voltage swing compared to MOSFETs, thus enabling aggressive supply voltage scaling for low power logic operation without impacting its ON-OFF current ratio. This dissertation presents the operating principle of TFET, the material selection strategy and device design for TFET fabrication. This is followed by a novel 6T SRAM design which circumvents the issue of unidirectional conduction in TFET. The switching behavior of TFET is studied through mixed-mode numerical simulations. The significance of correct benchmarking methodology to estimate the effective drive current and capacitance in TFET is highlighted and compared with MOSFET. This is followed by the fabrication details of homo-junction TFET. Analysis of the electrical characteristics of homo-junction TFET gives key insight into its device operation and identifies the critical factors that impact its performance. In order to boost the ON current, the design and fabrication of hetero-junction TFET is also presented.

  7. Improving Reliability in a Stochastic Communication Network

    DTIC Science & Technology

    1990-12-01

    and GINO. In addition, the following computers were used: a Sun 386i workstation, a Digital Equipment Corporation (DEC) 11/785 miniframe , and a DEC...operating system. The DEC 11/785 miniframe used in the experiment was running Unix Version 4.3 (Berkley System Domain). Maxflo was run on the DEC 11/785...the file was still called Mod- ifyl.for). 4. The Maxflo program was started on the DEC 11/785 miniframe . 5. At this time the Convert.max file, created

  8. 46 CFR 77.30-5 - General.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... pressure-demand, open-circuit type, approved by the Mine Safety and Health Administration (MSHA) and the National Institute for Occupational Safety and Health (NIOSH), and have at a minimum a 30-minute air supply... of the crew are familiar with the operation of the equipment. [CGFR 65-50, 30 FR 16953, Dec. 30, 1965...

  9. 41 CFR 101-30.403 - Utilization.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... FEDERAL PROPERTY MANAGEMENT REGULATIONS SUPPLY AND PROCUREMENT 30-FEDERAL CATALOG SYSTEM 30.4-Use of the Federal Catalog System § 101-30.403 Utilization. On and after the established date for completion of... classification, or stock numbers shall be in the terms of the Federal Catalog System. [29 FR 16004, Dec. 1, 1964] ...

  10. 41 CFR 101-30.403 - Utilization.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... FEDERAL PROPERTY MANAGEMENT REGULATIONS SUPPLY AND PROCUREMENT 30-FEDERAL CATALOG SYSTEM 30.4-Use of the Federal Catalog System § 101-30.403 Utilization. On and after the established date for completion of... classification, or stock numbers shall be in the terms of the Federal Catalog System. [29 FR 16004, Dec. 1, 1964] ...

  11. 41 CFR 101-30.403 - Utilization.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... FEDERAL PROPERTY MANAGEMENT REGULATIONS SUPPLY AND PROCUREMENT 30-FEDERAL CATALOG SYSTEM 30.4-Use of the Federal Catalog System § 101-30.403 Utilization. On and after the established date for completion of... classification, or stock numbers shall be in the terms of the Federal Catalog System. [29 FR 16004, Dec. 1, 1964] ...

  12. 41 CFR 101-30.403 - Utilization.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... FEDERAL PROPERTY MANAGEMENT REGULATIONS SUPPLY AND PROCUREMENT 30-FEDERAL CATALOG SYSTEM 30.4-Use of the Federal Catalog System § 101-30.403 Utilization. On and after the established date for completion of... classification, or stock numbers shall be in the terms of the Federal Catalog System. [29 FR 16004, Dec. 1, 1964] ...

  13. 41 CFR 101-30.403 - Utilization.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... FEDERAL PROPERTY MANAGEMENT REGULATIONS SUPPLY AND PROCUREMENT 30-FEDERAL CATALOG SYSTEM 30.4-Use of the Federal Catalog System § 101-30.403 Utilization. On and after the established date for completion of... classification, or stock numbers shall be in the terms of the Federal Catalog System. [29 FR 16004, Dec. 1, 1964] ...

  14. 24 CFR 3280.609 - Water distribution systems.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 24 Housing and Urban Development 5 2014-04-01 2014-04-01 false Water distribution systems. 3280....609 Water distribution systems. Link to an amendment published at 78 FR 73986, Dec. 9, 2013. (a) Water supply—(1) Supply piping. Piping systems shall be sized to provide an adequate quantity of water to each...

  15. Systems and Methods for Secure Transaction Management and Electronic Rights Protection

    DTIC Science & Technology

    2002-07-30

    4305131 Dec., 1981 Best. 4306289 Dec., 1981 Lumley. 4309569 Jan., 1982 Merkle . 4319079 Mar., 1982 Best. 4323921 Apr., 1982 Guillou. 4328544 May...Operating System Security, (USC/Information Science Institute, Marina Del Rey, CA), Oct. 1973, pp. 666-675. Rolf Blom, Robert Forchheimer, et al

  16. Dynamic tunable notch filters for the Antarctic Impulsive Transient Antenna (ANITA)

    NASA Astrophysics Data System (ADS)

    Allison, P.; Banerjee, O.; Beatty, J. J.; Connolly, A.; Deaconu, C.; Gordon, J.; Gorham, P. W.; Kovacevich, M.; Miki, C.; Oberla, E.; Roberts, J.; Rotter, B.; Stafford, S.; Tatem, K.; Batten, L.; Belov, K.; Besson, D. Z.; Binns, W. R.; Bugaev, V.; Cao, P.; Chen, C.; Chen, P.; Chen, Y.; Clem, J. M.; Cremonesi, L.; Dailey, B.; Dowkontt, P. F.; Hsu, S.; Huang, J.; Hupe, R.; Israel, M. H.; Kowalski, J.; Lam, J.; Learned, J. G.; Liewer, K. M.; Liu, T. C.; Ludwig, A. B.; Matsuno, S.; Mulrey, K.; Nam, J.; Nichol, R. J.; Novikov, A.; Prohira, S.; Rauch, B. F.; Ripa, J.; Romero-Wolf, A.; Russell, J.; Saltzberg, D.; Seckel, D.; Shiao, J.; Stockham, J.; Stockham, M.; Strutt, B.; Varner, G. S.; Vieregg, A. G.; Wang, S.; Wissel, S. A.; Wu, F.; Young, R.

    2018-06-01

    The Antarctic Impulsive Transient Antenna (ANITA) is a NASA long-duration balloon experiment with the primary goal of detecting ultra-high-energy (> 1018eV) neutrinos via the Askaryan Effect. The fourth ANITA mission, ANITA-IV, recently flew from Dec 2 to Dec 29, 2016. For the first time, the Tunable Universal Filter Frontend (TUFF) boards were deployed for mitigation of narrow-band, anthropogenic noise with tunable, switchable notch filters. The TUFF boards also performed second-stage amplification by approximately 45 dB to boost the ∼ μV-level radio frequency (RF) signals to ∼ mV-level for digitization, and supplied power via bias tees to the first-stage, antenna-mounted amplifiers. The other major change in signal processing in ANITA-IV is the resurrection of the 90 ° hybrids deployed previously in ANITA-I, in the trigger system, although in this paper we focus on the TUFF boards. During the ANITA-IV mission, the TUFF boards were successfully operated throughout the flight. They contributed to a factor of 2.8 higher total instrument livetime on average in ANITA-IV compared to ANITA-III due to reduction of narrow-band, anthropogenic noise before a trigger decision is made.

  17. DIRBE External Calibrator (DEC)

    NASA Technical Reports Server (NTRS)

    Wyatt, Clair L.; Thurgood, V. Alan; Allred, Glenn D.

    1987-01-01

    Under NASA Contract No. NAS5-28185, the Center for Space Engineering at Utah State University has produced a calibration instrument for the Diffuse Infrared Background Experiment (DIRBE). DIRBE is one of the instruments aboard the Cosmic Background Experiment Observatory (COBE). The calibration instrument is referred to as the DEC (Dirbe External Calibrator). DEC produces a steerable, infrared beam of controlled spectral content and intensity and with selectable point source or diffuse source characteristics, that can be directed into the DIRBE to map fields and determine response characteristics. This report discusses the design of the DEC instrument, its operation and characteristics, and provides an analysis of the systems capabilities and performance.

  18. Limits and Economic Effects of Distributed PV Generation in North and South Carolina

    NASA Astrophysics Data System (ADS)

    Holt, Kyra Moore

    The variability of renewable sources, such as wind and solar, when integrated into the electrical system must be compensated by traditional generation sources in-order to maintain the constant balance of supply and demand required for grid stability. The goal of this study is to analyze the effects of increasing large levels of solar Photovoltaic (PV) penetration (in terms of a percentage of annual energy production) on a test grid with similar characteristics to the Duke Energy Carolinas (DEC) and Progress Energy Carolinas (PEC) regions of North and South Carolina. PV production is modeled entering the system at the distribution level and regional PV capacity is based on household density. A gridded hourly global horizontal irradiance (GHI) dataset is used to capture the variable nature of PV generation. A unit commitment model (UCM) is then used determine the hourly dispatch of generators based on generator parameters and costs to supply generation to meet demand. Annual modeled results for six different scenarios are evaluated to determine technical, environmental and economic effects of varying levels of distributed PV penetration on the system. This study finds that the main limiting factor for PV integration in the DEC and PEC balancing authority regions is defined by the large generating capacity of base-load nuclear plants within the system. This threshold starts to affect system stability at integration levels of 5.7%. System errors, defined by imbalances caused by over or under generation with respect to demand, are identified in the model however the validity of these errors in real world context needs further examination due to the lack of high frequency irradiance data and modeling limitations. Operational system costs decreased as expected with PV integration although further research is needed to explore the impacts of the capital costs required to achieve the penetration levels found in this study. PV system generation was found to mainly displace coal generation creating a loss of revenue for generator owners. In all scenarios, CO 2 emissions were reduced with PV integration. This reduction could be used to meet impending EPA state-specific CO2 emissions targets.

  19. Digital ultrasonics signal processing: Flaw data post processing use and description

    NASA Technical Reports Server (NTRS)

    Buel, V. E.

    1981-01-01

    A modular system composed of two sets of tasks which interprets the flaw data and allows compensation of the data due to transducer characteristics is described. The hardware configuration consists of two main units. A DEC LSI-11 processor running under the RT-11 sngle job, version 2C-02 operating system, controls the scanner hardware and the ultrasonic unit. A DEC PDP-11/45 processor also running under the RT-11, version 2C-02, operating system, stores, processes and displays the flaw data. The software developed the Ultrasonics Evaluation System, is divided into two catagories; transducer characterization and flaw classification. Each category is divided further into two functional tasks: a data acquisition and a postprocessor ask. The flaw characterization collects data, compresses its, and writes it to a disk file. The data is then processed by the flaw classification postprocessing task. The use and operation of a flaw data postprocessor is described.

  20. Supervisory control of mobile sensor networks: math formulation, simulation, and implementation.

    PubMed

    Giordano, Vincenzo; Ballal, Prasanna; Lewis, Frank; Turchiano, Biagio; Zhang, Jing Bing

    2006-08-01

    This paper uses a novel discrete-event controller (DEC) for the coordination of cooperating heterogeneous wireless sensor networks (WSNs) containing both unattended ground sensors (UGSs) and mobile sensor robots. The DEC sequences the most suitable tasks for each agent and assigns sensor resources according to the current perception of the environment. A matrix formulation makes this DEC particularly useful for WSN, where missions change and sensor agents may be added or may fail. WSN have peculiarities that complicate their supervisory control. Therefore, this paper introduces several new tools for DEC design and operation, including methods for generating the required supervisory matrices based on mission planning, methods for modifying the matrices in the event of failed nodes, or nodes entering the network, and a novel dynamic priority assignment weighting approach for selecting the most appropriate and useful sensors for a given mission task. The resulting DEC represents a complete dynamical description of the WSN system, which allows a fast programming of deployable WSN, a computer simulation analysis, and an efficient implementation. The DEC is actually implemented on an experimental wireless-sensor-network prototyping system. Both simulation and experimental results are presented to show the effectiveness and versatility of the developed control architecture.

  1. 21 CFR 58.45 - Animal supply facilities.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 21 Food and Drugs 1 2010-04-01 2010-04-01 false Animal supply facilities. 58.45 Section 58.45 Food and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH AND HUMAN SERVICES GENERAL GOOD... infestation or contamination. Perishable supplies shall be preserved by appropriate means. [43 FR 60013, Dec...

  2. NASA ARCH- A FILE ARCHIVAL SYSTEM FOR THE DEC VAX

    NASA Technical Reports Server (NTRS)

    Scott, P. J.

    1994-01-01

    The function of the NASA ARCH system is to provide a permanent storage area for files that are infrequently accessed. The NASA ARCH routines were designed to provide a simple mechanism by which users can easily store and retrieve files. The user treats NASA ARCH as the interface to a black box where files are stored. There are only five NASA ARCH user commands, even though NASA ARCH employs standard VMS directives and the VAX BACKUP utility. Special care is taken to provide the security needed to insure file integrity over a period of years. The archived files may exist in any of three storage areas: a temporary buffer, the main buffer, and a magnetic tape library. When the main buffer fills up, it is transferred to permanent magnetic tape storage and deleted from disk. Files may be restored from any of the three storage areas. A single file, multiple files, or entire directories can be stored and retrieved. archived entities hold the same name, extension, version number, and VMS file protection scheme as they had in the user's account prior to archival. NASA ARCH is capable of handling up to 7 directory levels. Wildcards are supported. User commands include TEMPCOPY, DISKCOPY, DELETE, RESTORE, and DIRECTORY. The DIRECTORY command searches a directory of savesets covering all three archival areas, listing matches according to area, date, filename, or other criteria supplied by the user. The system manager commands include 1) ARCHIVE- to transfer the main buffer to duplicate magnetic tapes, 2) REPORTto determine when the main buffer is full enough to archive, 3) INCREMENT- to back up the partially filled main buffer, and 4) FULLBACKUP- to back up the entire main buffer. On-line help files are provided for all NASA ARCH commands. NASA ARCH is written in DEC VAX DCL for interactive execution and has been implemented on a DEC VAX computer operating under VMS 4.X. This program was developed in 1985.

  3. Crewmembers in the middeck with the FARE experiment.

    NASA Image and Video Library

    1992-12-09

    STS053-04-018 (2-9 Dec 1992) --- Astronauts Guion S. Bluford (left) and Michael R. U. (Rich) Clifford monitor the Fluid Acquisition and Resupply Equipment (FARE) onboard the Space Shuttle Discovery. Clearly visible in the mid-deck FARE setup is one of two 12.5-inch spherical tanks made of transparent acrylic, one to supply and one to receive fluids. The purpose of FARE is to investigate the dynamics of fluid transfer in microgravity and develop methods for transferring vapor-free propellants and other liquids that must be replenished in long-term space systems like satellites, Extended-Duration Orbiters (EDO), and Space Station Freedom. Eight times over an eight-hour test period, the mission specialists conducted the FARE experiment. A sequence of manual valve operations caused pressurized air from the bottles to force fluids from the supply tank to the receiver tank and back again to the supply tank. Baffles in the receiver tank controlled fluid motion during transfer, a fine-mesh screen filtered vapor from the fluid, and the overboard vent removed vapor from the receiver tank as the liquid rose. FARE is managed by NASA's Marshall Space Flight Center (MSFC) in Alabama. The basic equipment was developed by Martin Marietta for the Storable Fluid Management Demonstration. Susan L. Driscoll is the principal investigator.

  4. 48 CFR 3052.236-70 - Special precautions for work at operating airports.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... work at operating airports. 3052.236-70 Section 3052.236-70 Federal Acquisition Regulations System... work at operating airports. As prescribed in (HSAR) 48 CFR 3036.570, insert the following clause: Special Precautions for Work at Operating Airports (DEC 2003) (a) When work is to be performed at an...

  5. 48 CFR 3052.236-70 - Special precautions for work at operating airports.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... work at operating airports. 3052.236-70 Section 3052.236-70 Federal Acquisition Regulations System... work at operating airports. As prescribed in (HSAR) 48 CFR 3036.570, insert the following clause: Special Precautions for Work at Operating Airports (DEC 2003) (a) When work is to be performed at an...

  6. 48 CFR 3052.236-70 - Special precautions for work at operating airports.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... work at operating airports. 3052.236-70 Section 3052.236-70 Federal Acquisition Regulations System... work at operating airports. As prescribed in (HSAR) 48 CFR 3036.570, insert the following clause: Special Precautions for Work at Operating Airports (DEC 2003) (a) When work is to be performed at an...

  7. Library Automation Alternatives in 1996 and User Satisfaction Ratings of Library Users by Operating System.

    ERIC Educational Resources Information Center

    Cibbarelli, Pamela

    1996-01-01

    Examines library automation product introductions and conversions to new operating systems. Compares user satisfaction ratings of the following library software packages: DOS/Windows, UNIX, Macintosh, and DEC VAX/VMS. Software is rated according to documentation, service/support, training, product reliability, product capabilities, ease of use,…

  8. Analysis of Interactive Graphics Display Equipment for an Automated Photo Interpretation System.

    DTIC Science & Technology

    1982-06-01

    System provides the hardware and software for a range of graphics processor tasks. The IMAGE System employs the RSX- II M real - time operating . system in...One hard copy unit serves up to four work stations. The executive program of the IMAGE system is the DEC RSX- 11 M real - time operating system . In...picture controller. The PDP 11/34 executes programs concurrently under the RSX- I IM real - time operating system . Each graphics program consists of a

  9. 29 CFR 1952.361 - Developmental schedule.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... provided by the plan: (a) Development of a complete and operating management information and control system... achieve operational status by December 1, 1976. (e) Amendments to basic legislation to become effective by July 1, 1977. (f) Public employee program to become operational by July 1, 1977. [40 FR 57456, Dec. 10...

  10. Helicopter In-Flight Monitoring System Second Generation (HIMS II).

    DTIC Science & Technology

    1983-08-01

    acquisition cycle. B. Computer Chassis CPU (DEC LSI-II/2) -- Executes instructions contained in the memory. 32K memory (DEC MSVII-DD) --Contains program...when the operator executes command #2, 3, or 5 (display data). New cartridges can be inserted as required for truly unlimited, continuous data...is called bootstrapping. The software, which is stored on a tape cartridge, is loaded into memory by execution of a small program stored in read-only

  11. 48 CFR 970.5232-7 - Financial management system.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 5 2011-10-01 2011-10-01 false Financial management... for Management and Operating Contracts 970.5232-7 Financial management system. As prescribed in 970.3270(b)(1), insert the following clause: Financial Management System (DEC 2000) The Contractor shall...

  12. Light Truck Characteristics, Historical Data Base

    DOT National Transportation Integrated Search

    1980-11-01

    The report is a description of the data about the physical, operating performance, and market characteristics of light trucks for the model years 1955 through 1977, which is stored on tape in DOT/TSC DEC System 10 computer system. Vehicles are report...

  13. Light Duty Truck Characteristics, Historical Data Base

    DOT National Transportation Integrated Search

    1979-12-01

    The report is a collection of data concerning physical, operating, performance, and market characteristics of light duty trucks for the model years 1972 and 1975 thru 1977. The data is stored on tape in DOT/TSC DEC System 10 computer system. Informat...

  14. Detail view of the Fluid Acquisition and Resupply Equipment experiment.

    NASA Image and Video Library

    1992-12-09

    STS053-09-019 (2 - 9 Dec 1992) --- A medium close-up view of part of the Fluid Acquisition and Resupply Equipment (FARE) onboard the Space Shuttle Discovery. Featured in the mid-deck FARE setup is fluid activity in one of two 12.5-inch spherical tanks made of transparent acrylic. Pictured is the receiver tank. The other tank, out of frame below, is for supplying fluids. The purpose of FARE is to investigate the dynamics of fluid transfer in microgravity and develop methods for transferring vapor-free propellants and other liquids that must be replenished in long-term space systems like satellites, Extended-Duration Orbiters (EDO), and Space Station Freedom. Eight times over an eight-hour test period, the mission specialists conducted the FARE experiment. A sequence of manual valve operations caused pressurized air from the bottles to force fluids from the supply tank to the receiver tank and back again to the supply tank. Baffles in the receiver tank controlled fluid motion during transfer, a fine-mesh screen filtered vapor from the fluid, and the overboard vent removed vapor from the receiver tank as the liquid rose. FARE is managed by NASA's Marshall Space Flight Center (MSFC) in Alabama. The basic equipment was developed by Martin Marietta for the Storable Fluid Management Demonstration. Susan L. Driscoll is the principal investigator.

  15. FROST - FREEDOM OPERATIONS SIMULATION TEST VERSION 1.0

    NASA Technical Reports Server (NTRS)

    Deshpande, G. K.

    1994-01-01

    The Space Station Freedom Information System processes and transmits data between the space station and the station controllers and payload operators on the ground. Components of the system include flight hardware, communications satellites, software and ground facilities. FROST simulates operation of the SSF Information System, tracking every data packet from generation to destination for both uplinks and downlinks. This program collects various statistics concerning the SSF Information System operation and provides reports of these at user-specified intervals. Additionally, FROST has graphical display capability to enhance interpretation of these statistics. FROST models each of the components of the SSF Information System as an object, to which packets are generated, received, processed, transmitted, and/or dumped. The user must provide the information system design with specified parameters and inter-connections among objects. To aid this process, FROST supplies an example SSF Information System for simulation, but this example must be copied before it is changed and used for further simulation. Once specified, system architecture and parameters are put into the input file, named the Test Configuration Definition (TCD) file. Alternative system designs can then be simulated simply by editing the TCD file. Within this file the user can define new objects, alter object parameters, redefine paths, redefine generation rates and windows, and redefine object interconnections. At present, FROST does not model every feature of the SSF Information System, but it is capable of simulating many of the system's important functions. To generate data messages, which can come from any object, FROST defines "windows" to specify when, what kind, and how much of that data is generated. All messages are classified by priority as either (1)emergency (2)quick look (3)telemetry or (4)payload data. These messages are processed by all objects according to priority. That is, all priority 1 (emergency) messages are processed and transmitted before priority 2 messages, and so forth. FROST also allows for specification of "pipeline" or "direct" links. Pipeline links are used to broadcast at constant intervals, while direct links transmit messages only when packets are ready for transmission. FROST allows the user substantial flexibility to customize output for a simulation. Output consists of tables and graphs, as specified in the TCD file, to be generated at the specified interval. These tables may be generated at short intervals during the run to produce snapshots as simulation proceeds, or generated after the run to give a summary of the entire run. FROST is written in SIMSCRIPT II.5 (developed by CACI) for DEC VAX series computers running VMS. FROST was developed on a VAX 8700 and is intended to be run on large VAXes with at least 32Mb of memory. The main memory requirement for FROST is dependent on the number of processors used in the simulation and the event time. The standard distribution medium for this package is a 9-track 1600 BPI DEC VAX BACKUP Format Magnetic Tape. An executable is included on the tape in addition to the source code. FROST was developed in 1990 and is a copyrighted work with all copyright vested in NASA. DEC, VAX and VMS are registered trademarks of Digital Equipment Corporation. IBM PC is a trademark of International Business Machines. SIMSCRIPT II.5 is a trademark of CACI.

  16. A mixed integer linear programming model for operational planning of a biodiesel supply chain network from used cooking oil

    NASA Astrophysics Data System (ADS)

    Jonrinaldi, Hadiguna, Rika Ampuh; Salastino, Rades

    2017-11-01

    Environmental consciousness has paid many attention nowadays. It is not only about how to recycle, remanufacture or reuse used end products but it is also how to optimize the operations of the reverse system. A previous research has proposed a design of reverse supply chain of biodiesel network from used cooking oil. However, the research focused on the design of the supply chain strategy not the operations of the supply chain. It only decided how to design the structure of the supply chain in the next few years, and the process of each stage will be conducted in the supply chain system in general. The supply chain system has not considered operational policies to be conducted by the companies in the supply chain. Companies need a policy for each stage of the supply chain operations to be conducted so as to produce the optimal supply chain system, including how to use all the resources that have been designed in order to achieve the objectives of the supply chain system. Therefore, this paper proposes a model to optimize the operational planning of a biodiesel supply chain network from used cooking oil. A mixed integer linear programming is developed to model the operational planning of biodiesel supply chain in order to minimize the total operational cost of the supply chain. Based on the implementation of the model developed, the total operational cost of the biodiesel supply chain incurred by the system is less than the total operational cost of supply chain based on the previous research during seven days of operational planning about amount of 2,743,470.00 or 0.186%. Production costs contributed to 74.6 % of total operational cost and the cost of purchasing the used cooking oil contributed to 24.1 % of total operational cost. So, the system should pay more attention to these two aspects as changes in the value of these aspects will cause significant effects to the change in the total operational cost of the supply chain.

  17. The effects of regeneration temperature of the desiccant wheel on the performance of desiccant cooling cycles for greenhouse thermally insulated

    NASA Astrophysics Data System (ADS)

    Rjibi, Amel; Kooli, Sami; Guizani, Amenaallah

    2018-05-01

    The use of solar energy for cooling greenhouses in the hot period in Mediterranean climate is an important issue. Desiccant evaporative cooling (DEC) system is advantageous because it uses a low grade thermal energy and preserves the merits to be friendly environmentally technology. In this paper, a numerical investigation was carried out on a desiccant cooling system powered by air solar collectors coupled to an insulated greenhouse. The influence of the regeneration temperature on the air stream properties at every system component state point was studied. The performance of the desiccant cooling system was evaluated in terms of thermal and electric coefficient of performance. Results show that the best performance of the system (COPel = 14 and COPth = 0.94) was obtained for a 60 °C regeneration temperature and a supply flow rate ratio of 0.2. An economic analysis shows that the use of the DEC system for greenhouse cooling is attractive and profitable since the payback period is 1 years. The use of the proposed system allows saving 9396 kWh/year of electric energy compared to conventional system.

  18. Sub-Saharan Africa Report.

    DTIC Science & Technology

    1987-01-29

    Economic Upturn ^ (SAPA, 15 Dec 86) . • • • * *’ Heavy Rains Raise Hope of Record 1987 Maize Crop (Mick Collins; BUSINESS DAY, 17 Dec 86) New...been successful to the extent that the resi- dents had more than six months’ supply of vegetables to addition to growing green maize and wheat. Cde...displaced per- sons suggested that one immediate need, was that of vegetables. - The displaced persona were then train» ed In irrigation canal

  19. 48 CFR 970.5243-1 - Changes.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Changes. 970.5243-1... and Operating Contracts 970.5243-1 Changes. As prescribed in 970.4302-1, the contracting officer shall insert the following clause in all management and operating contracts: Changes (DEC 2000) (a) Changes and...

  20. DARK Technology Transition Plan

    DTIC Science & Technology

    1990-04-01

    or suspend/resume primitives , and bounded delays. Under the above circumstances, the extra language features, and the hidden system calls they... system , this implies that the mechanisms by which units interact - to synchronise , communicate, schedule one another, or alert one another - should be...the Kernel environment are: " The host system is a DEC VAX operating under VMS 5.0 (the specific host used at the SEI is a MicroVAX II operating under

  1. 46 CFR 126.225 - Alternate tonnage for offshore supply vessels seeking oil spill response vessel certification.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... oil spill response vessel certification. 126.225 Section 126.225 Shipping COAST GUARD, DEPARTMENT OF... Inspection § 126.225 Alternate tonnage for offshore supply vessels seeking oil spill response vessel... also be certificated as an oil spill response vessel. [76 FR 77131, Dec. 12, 2011] ...

  2. TENEX SAIL

    NASA Technical Reports Server (NTRS)

    Smith, R.

    1975-01-01

    SAIL, a high level ALGOL language for the PDP-10, is extended to operate under the TENEX time sharing system without executing DEC system calls. A large set of TENEX oriented runtime routines are added to allow complete access to TENEX. The emphasis is on compatibility of programs across time sharing systems and integrity of the language.

  3. Index to Army Times 1988

    DTIC Science & Technology

    1992-08-01

    LAW AND LEGISLATION Army family gets $1.56 million for medical mishap. Army Times; Dec. 26, 1988; 49(20): p. 11. House passes military malpractice suit...Times; May 16, 1938; 48(40): p. 24. 79 MALPRACTICE Com4puter databank will raise aler’ on doctors with malpractice woes. Army Times; Oct. 24, 1988; 49...Special pay for doctors . Army Times; Dec. 26, 1988; 49(20): p. 20. PHYSICIANS--SUPPLY AND DEMANO Women-oriented specialties fail to make medical

  4. 30 CFR 778.11 - Providing applicant and operator information.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... organizational structure, up to and including the ultimate parent entity of the applicant and operator; for every... title and relationship to you, including percentage of ownership and location in the organizational... controls a surface coal mining operation. [65 FR 79668, Dec. 19, 2000, as amended at 72 FR 68031, Dec. 3...

  5. KSC01PD1783

    NASA Image and Video Library

    2001-12-05

    KENNEDY SPACE CENTER, Fla. -- Eagerly stepping out from the Operations and Checkout Building are the STS-108 crew, leading the way, and the Expedition 4 crew as they head for Launch Pad 39B and Space Shuttle Endeavour. From front to back are, left to right, Pilot Mark E. Kelly and Commander Dominic L. Gorie; Mission Specialists Daniel M. Tani and Linda A. Godwin; Expedition 4 members Daniel W. Bursch, Commander Yuri Onufrienko and Carl E. Walz. This is the second launch attempt after the first attempt Dec. 4 was scrubbed due to poor weather conditions at KSC. The main goals of the mission are to carry the Expedition 4 crew to the International Space Station as replacement for Expedition 3; carry the Multi-Purpose Logistics Module Raffaello filled with water, equipment and supplies; and install thermal blankets over equipment at the base of the ISS solar wings. STS-108 is the final Shuttle mission of 2001 and the 107th Shuttle flight overall. Launch is scheduled for 5:19 p.m. EST (22:19 GMT) Dec. 5, 2001, from Launch Pad 39B

  6. Dynamic Management of Releases for the Delaware River Basin using NYC's Operations Support Tool

    NASA Astrophysics Data System (ADS)

    Weiss, W.; Wang, L.; Murphy, T.; Muralidhar, D.; Tarrier, B.

    2011-12-01

    The New York City Department of Environmental Protection (DEP) has initiated design of an Operations Support Tool (OST), a state-of-the-art decision support system to provide computational and predictive support for water supply operations and planning. Using an interim version of OST, DEP and the New York State Department of Environmental Conservation (DEC) have developed a provisional, one-year Delaware River Basin reservoir release program to succeed the existing Flexible Flow Management Program (FFMP) which expired on May 31, 2011. The FFMP grew out of the Good Faith Agreement of 1983 among the four Basin states (New York, New Jersey, Pennsylvania, and Delaware) that established modified diversions and flow targets during drought conditions. It provided a set of release schedules as a framework for managing diversions and releases from New York City's Delaware Basin reservoirs in order to support multiple objectives, including water supply, drought mitigation, flood mitigation, tailwaters fisheries, main stem habitat, recreation, and salinity repulsion. The provisional program (OST-FFMP) defines available water based on current Upper Delaware reservoir conditions and probabilistic forecasts of reservoir inflow. Releases are then set based on a set of release schedules keyed to the water availability. Additionally, OST-FFMP attempts to provide enhanced downstream flood protection by making spill mitigation releases to keep the Delaware System reservoirs at a seasonally varying conditional storage objective. The OST-FFMP approach represents a more robust way of managing downstream releases, accounting for predicted future hydrologic conditions by making more water available for release when conditions are forecasted to be wet and protecting water supply reliability when conditions are forecasted to be dry. Further, the dynamic nature of the program allows the release decision to be adjusted as hydrologic conditions change. OST simulations predict that this program can provide substantial benefits for downstream stakeholders while protecting DEP's ability to ensure a reliable water supply for 9 million customers in NYC and the surrounding communities. The one-year nature of the program will allow for DEP and the Decree Parties to evaluate and improve the program in the future. This paper will describe the OST-FFMP program and discuss preliminary observations on its performance based on key NYC and downstream stakeholder performance metrics.

  7. Conservative DEC Discretization of Incompressible Navier-Stokes Equations on Arbitrary Surface Simplicial Meshes

    NASA Astrophysics Data System (ADS)

    Mohamed, Mamdouh; Hirani, Anil; Samtaney, Ravi

    2017-11-01

    A conservative discretization of incompressible Navier-Stokes equations over surfaces is developed using discrete exterior calculus (DEC). The mimetic character of many of the DEC operators provides exact conservation of both mass and vorticity, in addition to superior kinetic energy conservation. The employment of signed diagonal Hodge star operators, while using the circumcentric dual defined on arbitrary meshes, is shown to produce correct solutions even when many non-Delaunay triangles pairs exist. This allows the DEC discretization to admit arbitrary surface simplicial meshes, in contrast to the previously held notion that DEC was limited only to Delaunay meshes. The discretization scheme is presented along with several numerical test cases demonstrating its numerical convergence and conservation properties. Recent developments regarding the extension to conservative higher order methods are also presented. KAUST Baseline Research Funds of R. Samtaney.

  8. Domestic Preference Policies in Federal Procurement

    DTIC Science & Technology

    1990-01-01

    prohibiting awards of certain service contracts,33 it does not purport to require such considerations with respect to the award of tm See, e.g., Lenzar ...of another specific exception to the Act4 3 or other statutory provision, for limiting 3 0See, e.g., Lenzar Optics Corp., Comp. Gen. Dec. B-225432...country source). eleSee, e.g., Lenzar Optics Corp., Comp. Gen. Dec. B-225432, Mar. 4, 1987, 87-1 CPD 1246; Yohar Supply Co., 66 Comp. Gen. 251 (1987

  9. Carolina Offshore Wind Integration Case Study: Phases I and II Final Technical Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Fallon, Christopher; Piper, Orvane; Hazelip, William

    2015-04-30

    Duke Energy performed a phase 1 study to assess the impact of offshore wind development in the waters off the coasts of North Carolina and South Carolina. The study analyzed the impacts to the Duke Energy Carolinas electric power system of multiple wind deployment scenarios. Focusing on an integrated utility system in the Carolinas provided a unique opportunity to assess the impacts of offshore wind development in a region that has received less attention regarding renewables than others in the US. North Carolina is the only state in the Southeastern United States that currently has a renewable portfolio standard (RPS)more » which requires that 12.5% of the state’s total energy requirements be met with renewable resources by 2021. 12.5% of the state’s total energy requirements in 2021 equates to approximately 17,000 GWH of energy needed from renewable resources. Wind resources represent one of the ways to potentially meet this requirement. The study builds upon and augments ongoing work, including a study by UNC to identify potential wind development sites and the analysis of impacts to the regional transmission system performed by the NCTPC, an Order 890 planning entity of which DEC is a member. Furthermore, because the region does not have an independent system operator (ISO) or regional transmission organization (RTO), the study will provide additional information unique to non-RTO/ISO systems. The Phase 2 study builds on the results of Phase 1 and investigates the dynamic stability of the electrical network in Task 4, the operating characteristics of the wind turbines as they impact operating reserve requirements of the DEC utility in Task 5, and the production cost of integrating the offshore wind resources into the DEC generation fleet making comparisons to future planned operation without the addition of the wind resources in Task 6.« less

  10. Managing drought risk with a computer model of the Raritan River Basin water-supply system in central New Jersey

    USGS Publications Warehouse

    Dunne, Paul; Tasker, Gary

    1996-01-01

    The reservoirs and pumping stations that comprise the Raritan River Basin water-supply system and its interconnections to the Delaware-Raritan Canal water-supply system, operated by the New Jersey Water Supply Authority (NJWSA), provide potable water to central New Jersey communities. The water reserve of this combined system can easily be depleted by an extended period of below-normal precipitation. Efficient operation of the combined system is vital to meeting the water-supply needs of central New Jersey. In an effort to improve the efficiency of the system operation, the U.S. Geological Survey (USGS), in cooperation with the NJWSA, has developed a computer model that provides a technical basis for evaluating the effects of alternative patterns of operation of the Raritan River Basin water-supply system. This fact sheet describes the model, its technical basis, and its operation.

  11. NASTRAN migration to UNIX

    NASA Technical Reports Server (NTRS)

    Chan, Gordon C.; Turner, Horace Q.

    1990-01-01

    COSMIC/NASTRAN, as it is supported and maintained by COSMIC, runs on four main-frame computers - CDC, VAX, IBM and UNIVAC. COSMIC/NASTRAN on other computers, such as CRAY, AMDAHL, PRIME, CONVEX, etc., is available commercially from a number of third party organizations. All these computers, with their own one-of-a-kind operating systems, make NASTRAN machine dependent. The job control language (JCL), the file management, and the program execution procedure of these computers are vastly different, although 95 percent of NASTRAN source code was written in standard ANSI FORTRAN 77. The advantage of the UNIX operating system is that it has no machine boundary. UNIX is becoming widely used in many workstations, mini's, super-PC's, and even some main-frame computers. NASTRAN for the UNIX operating system is definitely the way to go in the future, and makes NASTRAN available to a host of computers, big and small. Since 1985, many NASTRAN improvements and enhancements were made to conform to the ANSI FORTRAN 77 standards. A major UNIX migration effort was incorporated into COSMIC NASTRAN 1990 release. As a pioneer work for the UNIX environment, a version of COSMIC 89 NASTRAN was officially released in October 1989 for DEC ULTRIX VAXstation 3100 (with VMS extensions). A COSMIC 90 NASTRAN version for DEC ULTRIX DECstation 3100 (with RISC) is planned for April 1990 release. Both workstations are UNIX based computers. The COSMIC 90 NASTRAN will be made available on a TK50 tape for the DEC ULTRIX workstations. Previously in 1988, an 88 NASTRAN version was tested successfully on a SiliconGraphics workstation.

  12. Impact of Operating Rules on Planning Capacity Expansion of Urban Water Supply Systems

    NASA Astrophysics Data System (ADS)

    de Neufville, R.; Galelli, S.; Tian, X.

    2017-12-01

    This study addresses the impact of operating rules on capacity planning of urban water supply systems. The continuous growth of metropolitan areas represents a major challenge for water utilities, which often rely on industrial water supply (e.g., desalination, reclaimed water) to complement natural resources (e.g., reservoirs). These additional sources increase the reliability of supply, equipping operators with additional means to hedge against droughts. How do their rules for using industrial water supply impact the performance of water supply system? How might it affect long-term plans for capacity expansion? Possibly significantly, as demonstrated by the analysis of the operations and planning of a water supply system inspired by Singapore. Our analysis explores the system dynamics under multiple inflow and management scenarios to understand the extent to which alternative operating rules for the use of industrial water supply affect system performance. Results first show that these operating rules can have significant impact on the variability in system performance (e.g., reliability, energy use) comparable to that of hydro-climatological conditions. Further analyses of several capacity expansion exercises—based on our original hydrological and management scenarios—show that operating rules significantly affect the timing and magnitude of critical decisions, such as the construction of new desalination plants. These results have two implications: Capacity expansion analysis should consider the effect of a priori uncertainty about operating rules; and operators should consider how their flexibility in operating rules can affect their perceived need for capacity.

  13. View of food packets for the Gemini 7 space flight

    NASA Image and Video Library

    1965-12-10

    S65-61653 (1 Dec. 1965) --- Complete food supply for the two-man crew of the National Aeronautics and Space Administration's Gemini-7 spaceflight as it appears prior to stowage in the spacecraft. The food packages are tied in sequence for 28-manned days or a complete supply for two men for a 14-day mission. Photo credit: NASA

  14. 40 CFR 60.274a - Monitoring of operations.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... the equipment that is important to the performance of the total capture system (i.e., pressure sensors... this subpart shall check and record on a once-per-shift basis the furnace static pressure (if DEC system is in use, and a furnace static pressure gauge is installed according to paragraph (f) of this...

  15. The first X-45A Unmanned Combat Air Vehicle (UCAV) technology demonstrator completed its sixth flight on Dec. 19, 2002, raising its landing gear in flight for the first time. The X-45A flew for 40 minutes and reached an airspeed of 195 knots

    NASA Image and Video Library

    2002-12-19

    The first X-45A Unmanned Combat Air Vehicle (UCAV) technology demonstrator completed its sixth flight on Dec. 19, 2002, raising its landing gear in flight for the first time. The X-45A flew for 40 minutes and reached an airspeed of 195 knots and an altitude of 7,500 feet. Dryden is supporting the DARPA/Boeing team in the design, development, integration, and demonstration of the critical technologies, processes, and system attributes leading to an operational UCAV system. Dryden support of the X-45A demonstrator system includes analysis, component development, simulations, ground and flight tests.

  16. High-Level Operations in Nonprocedural Programming Languages.

    DTIC Science & Technology

    1983-12-01

    defining type specific operators. Abstract data type has been applied to the nonprocedural language NOPAL [Sang8O]. It was primarily used as a tool...level operation is transformed using the integral operation MATINV as follows: 1 GA IS GROUP, 2 GRA(*) IS GROUP, 3 AUX(*) IS FIELD (DEC FLOAT); I GI...IS GROUP, 2 GRI(*) IS GROUP, 3 INV(*) IS FIELD (DEC FLOAT); AUX = A; GI = MATINV( GA ); C = INV; In code generation, the assertion GI=MATINV( GA ) is

  17. 48 CFR 970.5203-3 - Contractor's organization.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contractor's organization... for Management and Operating Contracts 970.5203-3 Contractor's organization. As prescribed in 970.0371-9, insert the following clause: Contractor's Organization (DEC 2000) (a) Organization chart. As...

  18. 48 CFR 970.5232-8 - Integrated accounting.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Integrated accounting. 970... for Management and Operating Contracts 970.5232-8 Integrated accounting. As prescribed in 970.3270(b)(2), insert the following clause: Integrated Accounting (DEC 2000) Integrated accounting procedures...

  19. 48 CFR 970.5227-7 - Royalty information.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 5 2014-10-01 2014-10-01 false Royalty information. 970... for Management and Operating Contracts 970.5227-7 Royalty information. Insert the following provision in solicitations in accordance with 970.2702-4: Royalty Information (DEC 2000) (a) Cost or charges...

  20. 48 CFR 970.5227-6 - Patent indemnity-subcontracts.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Patent indemnity... for Management and Operating Contracts 970.5227-6 Patent indemnity—subcontracts. Insert the following clause in solicitations and contracts in accordance with 970.2702-3: Patent Indemnity—Subcontracts (DEC...

  1. 48 CFR 970.5227-6 - Patent indemnity-subcontracts.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 5 2011-10-01 2011-10-01 false Patent indemnity... for Management and Operating Contracts 970.5227-6 Patent indemnity—subcontracts. Insert the following clause in solicitations and contracts in accordance with 970.2702-3: Patent Indemnity—Subcontracts (DEC...

  2. 48 CFR 970.5227-6 - Patent indemnity-subcontracts.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 5 2014-10-01 2014-10-01 false Patent indemnity... for Management and Operating Contracts 970.5227-6 Patent indemnity—subcontracts. Insert the following clause in solicitations and contracts in accordance with 970.2702-3: Patent Indemnity—Subcontracts (DEC...

  3. 48 CFR 970.5227-6 - Patent indemnity-subcontracts.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 5 2013-10-01 2013-10-01 false Patent indemnity... for Management and Operating Contracts 970.5227-6 Patent indemnity—subcontracts. Insert the following clause in solicitations and contracts in accordance with 970.2702-3: Patent Indemnity—Subcontracts (DEC...

  4. 48 CFR 970.5227-6 - Patent indemnity-subcontracts.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 5 2012-10-01 2012-10-01 false Patent indemnity... for Management and Operating Contracts 970.5227-6 Patent indemnity—subcontracts. Insert the following clause in solicitations and contracts in accordance with 970.2702-3: Patent Indemnity—Subcontracts (DEC...

  5. Hold-up power supply for flash memory

    NASA Technical Reports Server (NTRS)

    Ott, William E. (Inventor)

    2004-01-01

    A hold-up power supply for flash memory systems is provided. The hold-up power supply provides the flash memory with the power needed to temporarily operate when a power loss exists. This allows the flash memory system to complete any erasures and writes, and thus allows it to shut down gracefully. The hold-up power supply detects when a power loss on a power supply bus is occurring and supplies the power needed for the flash memory system to temporally operate. The hold-up power supply stores power in at least one capacitor. During normal operation, power from a high voltage supply bus is used to charge the storage capacitors. When a power supply loss is detected, the power supply bus is disconnected from the flash memory system. A hold-up controller controls the power flow from the storage capacitors to the flash memory system. The hold-up controller uses feedback to assure that the proper voltage is provided from the storage capacitors to the flash memory system. This power supplied by the storage capacitors allows the flash memory system to complete any erasures and writes, and thus allows the flash memory system to shut down gracefully.

  6. 49 CFR 174.5 - Carrier's materials and supplies.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... requirements of this subchapter do not apply to railway torpedoes or fusees when carried in engines or rail cars. Railway torpedoes must be in closed metal boxes when not in use. [Amdt. 174-26B, 41 FR 57071, Dec...

  7. 49 CFR 174.5 - Carrier's materials and supplies.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... requirements of this subchapter do not apply to railway torpedoes or fusees when carried in engines or rail cars. Railway torpedoes must be in closed metal boxes when not in use. [Amdt. 174-26B, 41 FR 57071, Dec...

  8. 49 CFR 174.5 - Carrier's materials and supplies.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... requirements of this subchapter do not apply to railway torpedoes or fusees when carried in engines or rail cars. Railway torpedoes must be in closed metal boxes when not in use. [Amdt. 174-26B, 41 FR 57071, Dec...

  9. 49 CFR 174.5 - Carrier's materials and supplies.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... requirements of this subchapter do not apply to railway torpedoes or fusees when carried in engines or rail cars. Railway torpedoes must be in closed metal boxes when not in use. [Amdt. 174-26B, 41 FR 57071, Dec...

  10. 49 CFR 174.5 - Carrier's materials and supplies.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... requirements of this subchapter do not apply to railway torpedoes or fusees when carried in engines or rail cars. Railway torpedoes must be in closed metal boxes when not in use. [Amdt. 174-26B, 41 FR 57071, Dec...

  11. Drinking Water Supply without Use of a Disinfectant

    NASA Astrophysics Data System (ADS)

    Rajnochova, Marketa; Tuhovcak, Ladislav; Rucka, Jan

    2018-02-01

    The paper focuses on the issue of drinking water supply without use of any disinfectants. Before the public water supply network operator begins to consider switching to operation without use of chemical disinfection, initial assessment should be made, whether or not the water supply system in question is suitable for this type of operation. The assessment is performed by applying the decision algorithm. The initial assessment is followed by another decision algorithm which serves for managing and controlling the process of switching to drinking water supply without use of a disinfectant. The paper also summarizes previous experience and knowledge of this way operated public water supply systems in the Czech Republic.

  12. A new bipolar Qtrim power supply system

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Mi, C.; Bruno, D.; Drozd, J.

    2015-05-03

    This year marks the 15th run of RHIC (Relativistic Heavy Ion Collider) operations. The reliability of superconducting magnet power supplies is one of the essential factors in the entire accelerator complex. Besides maintaining existing power supplies and their associated equipment, newly designed systems are also required based on the physicist’s latest requirements. A bipolar power supply was required for this year’s main quadruple trim power supply. This paper will explain the design, prototype, testing, installation and operation of this recently installed power supply system.

  13. DET/MPS - THE GSFC ENERGY BALANCE PROGRAM, DIRECT ENERGY TRANSFER/MULTIMISSION SPACECRAFT MODULAR POWER SYSTEM (DEC VAX VMS VERSION)

    NASA Technical Reports Server (NTRS)

    Jagielski, J. M.

    1994-01-01

    The DET/MPS programs model and simulate the Direct Energy Transfer and Multimission Spacecraft Modular Power System in order to aid both in design and in analysis of orbital energy balance. Typically, the DET power system has the solar array directly to the spacecraft bus, and the central building block of MPS is the Standard Power Regulator Unit. DET/MPS allows a minute-by-minute simulation of the power system's performance as it responds to various orbital parameters, focusing its output on solar array output and battery characteristics. While this package is limited in terms of orbital mechanics, it is sufficient to calculate eclipse and solar array data for circular or non-circular orbits. DET/MPS can be adjusted to run one or sequential orbits up to about one week, simulated time. These programs have been used on a variety of Goddard Space Flight Center spacecraft projects. DET/MPS is written in FORTRAN 77 with some VAX-type extensions. Any FORTRAN 77 compiler that includes VAX extensions should be able to compile and run the program with little or no modifications. The compiler must at least support free-form (or tab-delineated) source format and 'do do-while end-do' control structures. DET/MPS is available for three platforms: GSC-13374, for DEC VAX series computers running VMS, is available in DEC VAX Backup format on a 9-track 1600 BPI tape (standard distribution) or TK50 tape cartridge; GSC-13443, for UNIX-based computers, is available on a .25 inch streaming magnetic tape cartridge in UNIX tar format; and GSC-13444, for Macintosh computers running AU/X with either the NKR FORTRAN or AbSoft MacFORTRAN II compilers, is available on a 3.5 inch 800K Macintosh format diskette. Source code and test data are supplied. The UNIX version of DET requires 90K of main memory for execution. DET/MPS was developed in 1990. A/UX and Macintosh are registered trademarks of Apple Computer, Inc. VMS, DEC VAX and TK50 are trademarks of Digital Equipment Corporation. UNIX is a registered trademark of AT&T Bell Laboratories.

  14. Stream traffic data archival, querying, and analysis with TransDec.

    DOT National Transportation Integrated Search

    2011-01-01

    The goal of research was to extend the traffic data analysis of the TransDec (short for : Transportation Decision-Making) system, which was developed under METRANS 09-26 : research grant. The TransDec system is a real-data driven system to support de...

  15. Can efficient supply management in the operating room save millions?

    PubMed

    Park, Kyung W; Dickerson, Cheryl

    2009-04-01

    Supply expenses occupy an ever-increasing portion of the expense budget in today's increasingly technologically complex operating rooms. Yet, little has been studied and published in the anesthesia literature. This review attempts to bring the topic of supply management to anesthesiologists, who play a significant role in operating room management. Little investigative work has been performed on supply management. Anecdotal reports suggest the benefits of a perpetual inventory system over a periodic inventory system. A perpetual inventory system uses utilization data to update inventory on hand continually and this information is linked to purchasing and restocking, whereas a periodic inventory system counts inventory at some regular intervals (such as annually) and uses average utilization to set par levels. On the basis of application of operational management concepts, ways of taking advantage of a perpetual inventory system to achieve savings in supply expenses are outlined. These include linking the operating room scheduling and supply order system, distributor-driven just-in-time delivery of case carts, continual updating of preference lists based on utilization patterns, increasing inventory turnovers, standardizing surgical practices, and vendor consignment of high unit-cost items such as implants. In addition, Lean principles of visual management and elimination of eight wastes may be applicable to supply management.

  16. Montecarlo Simulations for a Lep Experiment with Unix Workstation Clusters

    NASA Astrophysics Data System (ADS)

    Bonesini, M.; Calegari, A.; Rossi, P.; Rossi, V.

    Modular systems of RISC CPU based computers have been implemented for large productions of Montecarlo simulated events for the DELPHI experiment at CERN. From a pilot system based on DEC 5000 CPU’s, a full size system based on a CONVEX C3820 UNIX supercomputer and a cluster of HP 735 workstations has been put into operation as a joint effort between INFN Milano and CILEA.

  17. Currie with stowage bags

    NASA Image and Video Library

    1998-12-12

    S88-E-5135 (12-12-98) --- Astronaut Nancy J. Currie, mission specialist, totes a lamp while sorting through a mountain of bags filled with hardware, equipment and supplies onboard Endeavour. The photo was taken with an electronic still camera at 03:49:03 GMT, Dec. 12.

  18. A keyboard control method for loop measurement

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Gao, Z.W.

    1994-12-31

    This paper describes a keyboard control mode based on the DEC VAX computer. The VAX Keyboard code can be found under running of a program was developed. During the loop measurement or multitask operation, it ables to be distinguished from a keyboard code to stop current operation or transfer to another operation while previous information can be held. The combining of this mode, the author successfully used one key control loop measurement for test Dual Input Memory module which is used in a rearrange Energy Trigger system for LEP 8 Bunch operation.

  19. 46 CFR 111.97-5 - Electric and hydraulic power supply.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Electric Power-Operated Watertight Door Systems § 111.97-5 Electric and hydraulic power supply. (a) Each electric motor-driven door operating system must have the same.... (f) The source of power for each hydraulically operated watertight door system using an independent...

  20. 46 CFR 111.97-5 - Electric and hydraulic power supply.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Electric Power-Operated Watertight Door Systems § 111.97-5 Electric and hydraulic power supply. (a) Each electric motor-driven door operating system must have the same.... (f) The source of power for each hydraulically operated watertight door system using an independent...

  1. 46 CFR 111.97-5 - Electric and hydraulic power supply.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Electric Power-Operated Watertight Door Systems § 111.97-5 Electric and hydraulic power supply. (a) Each electric motor-driven door operating system must have the same.... (f) The source of power for each hydraulically operated watertight door system using an independent...

  2. 46 CFR 111.97-5 - Electric and hydraulic power supply.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Electric Power-Operated Watertight Door Systems § 111.97-5 Electric and hydraulic power supply. (a) Each electric motor-driven door operating system must have the same.... (f) The source of power for each hydraulically operated watertight door system using an independent...

  3. 46 CFR 111.97-5 - Electric and hydraulic power supply.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Electric Power-Operated Watertight Door Systems § 111.97-5 Electric and hydraulic power supply. (a) Each electric motor-driven door operating system must have the same.... (f) The source of power for each hydraulically operated watertight door system using an independent...

  4. Coupling long and short term decisions in the design of urban water supply infrastructure for added reliability and flexibility

    NASA Astrophysics Data System (ADS)

    Marques, G.; Fraga, C. C. S.; Medellin-Azuara, J.

    2016-12-01

    The expansion and operation of urban water supply systems under growing demands, hydrologic uncertainty and water scarcity requires a strategic combination of supply sources for reliability, reduced costs and improved operational flexibility. The design and operation of such portfolio of water supply sources involves integration of long and short term planning to determine what and when to expand, and how much to use of each supply source accounting for interest rates, economies of scale and hydrologic variability. This research presents an integrated methodology coupling dynamic programming optimization with quadratic programming to optimize the expansion (long term) and operations (short term) of multiple water supply alternatives. Lagrange Multipliers produced by the short-term model provide a signal about the marginal opportunity cost of expansion to the long-term model, in an iterative procedure. A simulation model hosts the water supply infrastructure and hydrologic conditions. Results allow (a) identification of trade offs between cost and reliability of different expansion paths and water use decisions; (b) evaluation of water transfers between urban supply systems; and (c) evaluation of potential gains by reducing water system losses as a portfolio component. The latter is critical in several developing countries where water supply system losses are high and often neglected in favor of more system expansion.

  5. Potential of phosphorus recovery from sewage sludge and manure ash by thermochemical treatment.

    PubMed

    Havukainen, Jouni; Nguyen, Mai Thanh; Hermann, Ludwig; Horttanainen, Mika; Mikkilä, Mirja; Deviatkin, Ivan; Linnanen, Lassi

    2016-03-01

    All life forms require phosphorus (P), which has no substitute in food production. The risk of phosphorus loss from soil and limited P rock reserves has led to the development of recycling P from industrial residues. This study investigates the potential of phosphorus recovery from sewage sludge and manure ash by thermochemical treatment (ASH DEC) in Finland. An ASH DEC plant could receive 46-76 kt/a of sewage sludge ash to produce 51-85 kt/a of a P-rich product with a P2O5 content of 13-18%, while 320-750 kt/a of manure ash could be supplied to produce 350-830 kt/a of a P-rich product with a P content of 4-5%. The P2O5 potential in the total P-rich product from the ASH DEC process using sewage sludge and manure ash is estimated to be 25-47 kt/a, which is significantly more than the P fertilizer demand in Finland's agricultural industries. The energy efficiency of integrated incineration and the ASH DEC process is more dependent on the total solid content and the subsequent need for mechanical dewatering and thermal drying than on the energy required by the ASH DEC process. According to the results of this study, the treated sewage sludge and manure ash using the ASH DEC process represent significant potential phosphorus sources for P fertilizer production. Copyright © 2016 Elsevier Ltd. All rights reserved.

  6. Derivation of optimal joint operating rules for multi-purpose multi-reservoir water-supply system

    NASA Astrophysics Data System (ADS)

    Tan, Qiao-feng; Wang, Xu; Wang, Hao; Wang, Chao; Lei, Xiao-hui; Xiong, Yi-song; Zhang, Wei

    2017-08-01

    The derivation of joint operating policy is a challenging task for a multi-purpose multi-reservoir system. This study proposed an aggregation-decomposition model to guide the joint operation of multi-purpose multi-reservoir system, including: (1) an aggregated model based on the improved hedging rule to ensure the long-term water-supply operating benefit; (2) a decomposed model to allocate the limited release to individual reservoirs for the purpose of maximizing the total profit of the facing period; and (3) a double-layer simulation-based optimization model to obtain the optimal time-varying hedging rules using the non-dominated sorting genetic algorithm II, whose objectives were to minimize maximum water deficit and maximize water supply reliability. The water-supply system of Li River in Guangxi Province, China, was selected for the case study. The results show that the operating policy proposed in this study is better than conventional operating rules and aggregated standard operating policy for both water supply and hydropower generation due to the use of hedging mechanism and effective coordination among multiple objectives.

  7. Orion Washdown & Arrival at LASF

    NASA Image and Video Library

    2014-12-18

    NASA's Orion crew module, enclosed in its crew module transportation fixture and secured on a flatbed truck, leaves the Multi-Operation Support Building and is being transported to the Launch Abort System Facility at NASA's Kennedy Space Center in Florida. Orion was transported 2,700 miles overland from Naval Base San Diego in California. Orion was recovered from the Pacific Ocean after completing a two-orbit, four-and-a-half hour mission Dec. 5 to test systems critical to crew safety, including the launch abort system, the heat shield and the parachute system. The Ground Systems Development and Operations Program led the recovery, offload and transportation efforts.

  8. Quantitative assessment of resilience of a water supply system under rainfall reduction due to climate change

    NASA Astrophysics Data System (ADS)

    Amarasinghe, Pradeep; Liu, An; Egodawatta, Prasanna; Barnes, Paul; McGree, James; Goonetilleke, Ashantha

    2016-09-01

    A water supply system can be impacted by rainfall reduction due to climate change, thereby reducing its supply potential. This highlights the need to understand the system resilience, which refers to the ability to maintain service under various pressures (or disruptions). Currently, the concept of resilience has not yet been widely applied in managing water supply systems. This paper proposed three technical resilience indictors to assess the resilience of a water supply system. A case study analysis was undertaken of the Water Grid system of Queensland State, Australia, to showcase how the proposed indicators can be applied to assess resilience. The research outcomes confirmed that the use of resilience indicators is capable of identifying critical conditions in relation to the water supply system operation, such as the maximum allowable rainfall reduction for the system to maintain its operation without failure. Additionally, resilience indicators also provided useful insight regarding the sensitivity of the water supply system to a changing rainfall pattern in the context of climate change, which represents the system's stability when experiencing pressure. The study outcomes will help in the quantitative assessment of resilience and provide improved guidance to system operators to enhance the efficiency and reliability of a water supply system.

  9. ART/Ada design project, phase 1: Project plan

    NASA Technical Reports Server (NTRS)

    Allen, Bradley P.

    1988-01-01

    The plan and schedule for Phase 1 of the Ada based ESBT Design Research Project is described. The main platform for the project is a DEC Ada compiler on VAX mini-computers and VAXstations running the Virtual Memory System (VMS) operating system. The Ada effort and lines of code are given in tabular form. A chart is given of the entire project life cycle.

  10. 75 FR 47701 - Electronic System for Travel Authorization (ESTA): Travel Promotion Fee and Fee for Use of the...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-09

    ...; CBP Dec. No. 10-25] RIN 1651-AA83 Electronic System for Travel Authorization (ESTA): Travel Promotion... congressionally mandated fee of $14.00, which is the sum of two amounts: a $10 travel promotion fee for an approved ESTA statutorily set by the Travel Promotion Act and a $4.00 operational fee for the use of ESTA...

  11. Strategic supply system design - a holistic evaluation of operational and production cost for a biorefinery supply chain

    DOE PAGES

    Lamers, Patrick; Tan, Eric C. D.; Searcy, Erin M.; ...

    2015-08-20

    Here, pioneer cellulosic biorefineries across the United States rely on a conventional feedstock supply system based on one-year contracts with local growers, who harvest, locally store, and deliver feed-stock in low-density format to the conversion facility. While the conventional system is designed for high biomass yield areas, pilot scale operations have experienced feedstock supply shortages and price volatilities due to reduced harvests and competition from other industries. Regional supply dependency and the inability to actively manage feedstock stability and quality, provide operational risks to the biorefinery, which translate into higher investment risk. The advanced feedstock supply system based on amore » network of depots can mitigate many of these risks and enable wider supply system benefits. This paper compares the two concepts from a system-level perspective beyond mere logistic costs. It shows that while processing operations at the depot increase feedstock supply costs initially, they enable wider system benefits including supply risk reduction (leading to lower interest rates on loans), industry scale-up, conversion yield improvements, and reduced handling equipment and storage costs at the biorefinery. When translating these benefits into cost reductions per liter of gasoline equivalent (LGE), we find that total cost reductions between -0.46 to -0.21 per LGE for biochemical and -0.32 to -0.12 per LGE for thermochemical conversion pathways are possible. Naturally, these system level benefits will differ between individual actors along the feedstock supply chain. Further research is required with respect to depot sizing, location, and ownership structures.« less

  12. Strategic supply system design - a holistic evaluation of operational and production cost for a biorefinery supply chain

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lamers, Patrick; Tan, Eric C. D.; Searcy, Erin M.

    Here, pioneer cellulosic biorefineries across the United States rely on a conventional feedstock supply system based on one-year contracts with local growers, who harvest, locally store, and deliver feed-stock in low-density format to the conversion facility. While the conventional system is designed for high biomass yield areas, pilot scale operations have experienced feedstock supply shortages and price volatilities due to reduced harvests and competition from other industries. Regional supply dependency and the inability to actively manage feedstock stability and quality, provide operational risks to the biorefinery, which translate into higher investment risk. The advanced feedstock supply system based on amore » network of depots can mitigate many of these risks and enable wider supply system benefits. This paper compares the two concepts from a system-level perspective beyond mere logistic costs. It shows that while processing operations at the depot increase feedstock supply costs initially, they enable wider system benefits including supply risk reduction (leading to lower interest rates on loans), industry scale-up, conversion yield improvements, and reduced handling equipment and storage costs at the biorefinery. When translating these benefits into cost reductions per liter of gasoline equivalent (LGE), we find that total cost reductions between -0.46 to -0.21 per LGE for biochemical and -0.32 to -0.12 per LGE for thermochemical conversion pathways are possible. Naturally, these system level benefits will differ between individual actors along the feedstock supply chain. Further research is required with respect to depot sizing, location, and ownership structures.« less

  13. 40 CFR 60.274 - Monitoring of operations.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... that is important to the performance of the total capture system (i.e., pressure sensors, dampers, and... under paragraph (d) of this section; and (4) All pressure data obtained under paragraph (f) of this... provisions of this subpart shall check and record on a once-per-shift basis furnace static pressure (if a DEC...

  14. 48 CFR 970.5227-2 - Rights in data-technology transfer.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Rights in data-technology... for Management and Operating Contracts 970.5227-2 Rights in data-technology transfer. As prescribed in 48 CFR 970.2704-3(b), insert the following clause: Rights in Data—Technology Transfer (DEC 2000) (a...

  15. Aerial of the Orion EFT-1 Arrival at KSC

    NASA Image and Video Library

    2014-12-18

    An aerial view reveals the Orion crew module, enclosed in its crew module transportation fixture and secured on a flatbed truck is proceeding to the Multi-Operation Support Building at NASA's Kennedy Space Center. Orion made the 2,700 mile overland trip from Naval Base San Diego in California. The spacecraft was recovered from the Pacific Ocean after completing a two-orbit, four-and-a-half hour mission Dec. 5 to test systems critical to crew safety, including the launch abort system, the heat shield and the parachute system. The Ground Systems Development and Operations Program led the recovery, offload and transportation efforts.

  16. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Davlin, Thomas

    The overall deliverable from the project is the design, construction and commissioning of a detention facility heating and cooling system that minimizes ownership costs and maximizes efficiency (and therefore minimizes environmental impact). The primary deliverables were the proof of concept for the application of geothermal systems for an institutional facility and the ongoing, quarterly system operating data downloads to the Department of Energy . The primary advantage of geothermal based heat pump systems is the higher efficiency of the system compared to a conventional chiller, boiler, cooling tower based system. The higher efficiency results in a smaller environmental foot printmore » and lower energy costs for the detention facility owner, Lancaster County. The higher efficiency for building cooling is primarily due to a more constant compressor condensing temperature with the geothermal well field acting as a thermal “sink” (in place of the conventional system’s cooling tower). In the heating mode, Ground Couple Heat Pump (GCHP) systems benefits from the advantage of a heat pump Coefficient of Performance (COP) of approximately 3.6, significantly better than a conventional gas boiler. The geothermal well field acting as a thermal “source” allows the heat pumps to operate efficiently in the heating mode regardless of ambient temperatures. The well field is partially located in a wetland with a high water table so, over time, the project will be able to identify the thermal loading characteristics of a well field located in a high water table location. The project demonstrated how a large geothermal well field can be installed in a wetland area in an economical and environmentally sound manner. Finally, the SW 40th Street Thermal Energy Plant project demonstrates the benefits of providing domestic hot water energy, as well as space heating, to help balance well filed thermal loading in a cooling dominated application. During the period of August 2012 thru March 2014, with the detention facility occupied for the final seven months, the well field supply water temperatures to the heat pumps dropped to a minimum of 39°F and reached a maximum temperature of 68 °F while providing 15,819 MMBtu of cooling energy and 27,467 MMBtu of heating energy. During this period the peak recorded system cooling load was 610 tons and the peak heating load was 8.4 MMBtu. The DEC is currently evaluating the most beneficial electric rate for plant operations. Total project cost of $16.9 million was approximately $3.2 million less than the estimate provided in the grant application. The reduction in project costs were primarily due to favorable construction material prices as well as strong competition in the local construction contractor market. The DEC plant reached the substantial completion milestone in December 2011 and began providing thermal service to the detention facility in January 2012 when the building’s HVAC system was ready to accept heating service. The plant reached commercial operating status on August 1, 2012. However, due to construction delays, the detention facility was not occupied until September of 2013. The detention facility construction delays also impacted the installation and commissioning of the project’s dedicated domestic hot water heat pump. Final coordination with the detention facility’s building management system vendor to establish network links for the exchange of date is currently being completed. This will allow the development of control sequences for the optimal operation of the domestic hot water system.« less

  17. Researching of the possibility of using absorption heat exchangers for creating the low return temperature heat supply systems based on CHP generation

    NASA Astrophysics Data System (ADS)

    Yavorovsky, Y. V.; Malenkov, A. S.; Zhigulina, Y. V.; Romanov, D. O.; Kurzanov, S. Y.

    2017-11-01

    This paper deals with the variant of modernization of the heat point within urban heat supply network in order to create the system of heat and cold supply on its basis, providing the suppliers with heat in cold months and with heat and cold in warm months. However, in cold months in the course of heating system operation, the reverse delivery water temperature is maintained below 40 °C. The analysis of heat and power indicators of the heat and cold supply system under different operating conditions throughout the year was conducted. The possibility to use the existing heat networks for the cold supply needs was estimated. The advantages of the system over the traditional heat supply systems that use Combined Heat and Power (CHP) plant as a heat source as exemplified by heat supply system from CHP with ST-80 turbine were demonstrated.

  18. Military Publications, Index of Test Operations Procedures

    DTIC Science & Technology

    1981-10-01

    AND RECORDING EQUIPMENT B033862L VOL X ELECTRONIC TEST EQUIPMENT BO33863L VOL XI MAINTENANCE OF ARMY AIRCRAFT; OPERATORS AND CREWMEMBERS MANUALS ...SYSTEMS 718646 6 JUN 68 6-2-186 (L) METEOROLOGICAL EQUIPMENT; METEOROLOGICAL STATIONS, MANUAL OR AUTOMATIC 870954 20 MAR 70 6-2-189 (L) METEOROLOGICAL...69 6-2-250 (L) RELAYS, RADIO 718622 16 APR 69 6-2-262 (L) SUPPRESSORS, VOLTAGE TRANSIENT 720578 MAR 67 6-2-265 (L) SWITCHBOARDS, MANUAL 718647 1 DEC

  19. Real-Time, General-Purpose, High-Speed Signal Processing Systems for Underwater Research. Proceedings of a Working Level Conference held at Supreme Allied Commander, Atlantic Anti-Submarine Warfare Research Center (SACLANTCEN) on 18-21 September 1979. Part 2. Sessions IV to VI.

    DTIC Science & Technology

    1979-12-01

    ACTIVATED, SYSTEM OPERATION AND TESTING MASCOT PROVIDES: 1. SYSTEM BUILD SOFTWARE COMPILE-TIME CHECKS,a. 2. RUN-TIME SUPERVISOR KERNEL, 3, MONITOR AND...p AD-AOBI 851 SACLANT ASW RESEARCH CENTRE LA SPEZIA 11ITALY) F/B 1711 REAL-TIME, GENERAL-PURPOSE, HIGH-SPEED SIGNAL PROCESSING SYSTEM -- ETC (U) DEC 79...Table of Contents Table of Contents (Cont’d) Page Signal processing language and operating system (w) 23-1 to 23-12 by S. Weinstein A modular signal

  20. KSC-2014-4853

    NASA Image and Video Library

    2014-12-18

    CAPE CANAVERAL, Fla. -- NASA's Orion crew module, enclosed in its crew module transportation fixture and secured on a flatbed truck, leaves the Multi-Operation Support Building and is being transported to the Launch Abort System Facility at NASA's Kennedy Space Center in Florida. Orion was transported 2,700 miles overland from Naval Base San Diego in California. Orion was recovered from the Pacific Ocean after completing a two-orbit, four-and-a-half hour mission Dec. 5 to test systems critical to crew safety, including the launch abort system, the heat shield and the parachute system. The Ground Systems Development and Operations Program led the recovery, offload and transportation efforts. For more information, visit www.nasa.gov/orion. Photo credit: NASA/Kim Shiflett

  1. Sea Perch Project

    NASA Image and Video Library

    2010-12-11

    David Lalejini, an employee of the Naval Research Laboratory at NASA's John C. Stennis Space Center, helps a pair of teachers deploy a remotely-operated underwater Sea Perch robot during workshop activities Dec. 11. The Stennis Education Office teamed with Naval Research Laboratory counterparts to conduct a two-day workshop Dec. 10-11 for Louisiana and Mississippi teachers. During the no-cost workshop, teachers learned to build and operate Sea Perch robots. The teachers now can take the Sea Perch Program back to students.

  2. Sea Perch Project

    NASA Technical Reports Server (NTRS)

    2010-01-01

    David Lalejini, an employee of the Naval Research Laboratory at NASA's John C. Stennis Space Center, helps a pair of teachers deploy a remotely-operated underwater Sea Perch robot during workshop activities Dec. 11. The Stennis Education Office teamed with Naval Research Laboratory counterparts to conduct a two-day workshop Dec. 10-11 for Louisiana and Mississippi teachers. During the no-cost workshop, teachers learned to build and operate Sea Perch robots. The teachers now can take the Sea Perch Program back to students.

  3. 46 CFR 112.43-11 - Illumination for launching operations.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 112.43-11 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING EMERGENCY LIGHTING AND POWER SYSTEMS Emergency Lighting Systems § 112.43-11 Illumination for launching operations. Branch circuits supplying power to lights for survival craft launching operations must supply no...

  4. 46 CFR 112.43-11 - Illumination for launching operations.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 112.43-11 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING EMERGENCY LIGHTING AND POWER SYSTEMS Emergency Lighting Systems § 112.43-11 Illumination for launching operations. Branch circuits supplying power to lights for survival craft launching operations must supply no...

  5. 46 CFR 112.43-11 - Illumination for launching operations.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 112.43-11 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING EMERGENCY LIGHTING AND POWER SYSTEMS Emergency Lighting Systems § 112.43-11 Illumination for launching operations. Branch circuits supplying power to lights for survival craft launching operations must supply no...

  6. 46 CFR 112.43-11 - Illumination for launching operations.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 112.43-11 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING EMERGENCY LIGHTING AND POWER SYSTEMS Emergency Lighting Systems § 112.43-11 Illumination for launching operations. Branch circuits supplying power to lights for survival craft launching operations must supply no...

  7. 46 CFR 112.43-11 - Illumination for launching operations.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 112.43-11 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING EMERGENCY LIGHTING AND POWER SYSTEMS Emergency Lighting Systems § 112.43-11 Illumination for launching operations. Branch circuits supplying power to lights for survival craft launching operations must supply no...

  8. CONTOUR; a modification of G.I. Evenden's general purpose contouring program

    USGS Publications Warehouse

    Godson, R.H.; Webring, M.W.

    1982-01-01

    A contouring program written for the DEC-10 computer (Evenden, 1975) has been modified and enhanced to operate on a Honeywell Multics 68/80 computer. The program uses a device independent plotting system (Wahl, 1977) so that output can be directed to any of several plotting devices by simply specifying one input variable.

  9. Ion extraction from a plasma. Ph.D. Thesis. Progress Report, 1 Dec. 1979 - 1 Dec. 1980

    NASA Technical Reports Server (NTRS)

    Aston, G.

    1980-01-01

    An experimental investigation of the physical processes governing ion extraction from a plasma is presented. The screen hole plasma sheath of a multiaperture ion accelerator system is defined by equipotential plots for a variety of accelerator system geometries and operating conditions. A sheath thickness of at least fifteen Debye lengths is shown to be typical. The electron density variation within the sheath satisfies a Maxwell Boltzmann density distribution at an effective electron temperature dependent on the discharge plasma primary to Maxwellian electron density ratio. Plasma ion flow up to and through the sheath is predominately one dimensional and the ions enter the sheath with a modified Bohm velocity. Low values of the screen grid thickness to screen hole diameter ratio give good ion focusing and high extracted ion currents because of the effect of screen webbing on ion focusing.

  10. Environmental Assessment for Alternate Water Supply System, Joint Base Langley-Eustis, Newport News, Virginia

    DTIC Science & Technology

    2013-06-01

    including suggestions for reducing this burden, to Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson...System Permanent Easement (acres) ................................................. 15 Table 3.4: Comparison of Construction and Operation ...cultural, transportation and socioeconomic effects associated with the proposed construction and operation of an alternate water supply system and

  11. U.S. Commercial Cargo Ship Arrives at the Space Station

    NASA Image and Video Library

    2017-12-17

    Loaded with some three tons of experiments and supplies, the SpaceX Dragon cargo craft arrived at the International Space Station Dec. 17, where Expedition 53 crew members Mark Vande Hei and Joe Acaba of NASA captured it by using the Canadian-built robotic arm. Ground controllers at NASA’s Johnson Space Center in Houston took over after Dragon was grappled, sending commands to maneuver the ship to the Earth-facing side of the Harmony module where it was attached for a month-long stay. Dragon was launched Dec. 15 on the SpaceX Falcon 9 rocket from Complex 40 at the Cape Canaveral Air Force Station in Florida to begin its journey to the international outpost.

  12. SpaceX CRS-13 "What's on Board?" Mission Science Briefing

    NASA Image and Video Library

    2017-12-11

    Yasaman Shirazi, mission scientist at NASA’s Ames Research Center in Mountain View, California, speaks on an investigation testing drug delivery systems for combatting muscle breakdown in microgravity with members of social media in the Kennedy Space Center’s Press Site auditorium. The briefing focused on research planned for launch to the International Space Station. The scientific materials and supplies will be aboard a Dragon spacecraft scheduled for liftoff from Cape Canaveral Air Force Station's Space Launch Complex 40 at 11:46 a.m. EST, on Dec. 12, 2017. The SpaceX Falcon 9 rocket will launch the company's 13th Commercial Resupply Services mission to the space station.

  13. SpaceX CRS-13 "What's on Board?" Mission Science Briefing

    NASA Image and Video Library

    2017-12-11

    In the Kennedy Space Center’s Press Site auditorium, Alessandro Grattoni, principal investigator at Houston Methodist Research Institute, shows the small hardware to be tested during an investigation into a drug delivery systems for combatting muscle breakdown in microgravity. The briefing focused on research planned for launch to the International Space Station. The scientific materials and supplies will be aboard a Dragon spacecraft scheduled for liftoff from Cape Canaveral Air Force Station's Space Launch Complex 40 at 11:46 a.m. EST, on Dec. 12, 2017. The SpaceX Falcon 9 rocket will launch the company's 13th Commercial Resupply Services mission to the space station.

  14. FORTRAN plotting subroutines for the space plasma laboratory

    NASA Technical Reports Server (NTRS)

    Williams, R.

    1983-01-01

    The computer program known as PLOTRW was custom made to satisfy some of the graphics requirements for the data collected in the Space Plasma Laboratory at the Johnson Space Center (JSC). The general requirements for the program were as follows: (1) all subroutines shall be callable through a FORTRAN source program; (2) all graphs shall fill one page and be properly labeled; (3) there shall be options for linear axes and logarithmic axes; (4) each axis shall have tick marks equally spaced with numeric values printed at the beginning tick mark and at the last tick mark; and (5) there shall be three options for plotting. These are: (1) point plot, (2) line plot and (3) point-line plot. The subroutines were written in FORTRAN IV for the LSI-11 Digital equipment Corporation (DEC) Computer. The program is now operational and can be run on any TEKTRONICX graphics terminal that uses a DEC Real-Time-11 (RT-11) operating system.

  15. Fault-Tree Compiler Program

    NASA Technical Reports Server (NTRS)

    Butler, Ricky W.; Martensen, Anna L.

    1992-01-01

    FTC, Fault-Tree Compiler program, is reliability-analysis software tool used to calculate probability of top event of fault tree. Five different types of gates allowed in fault tree: AND, OR, EXCLUSIVE OR, INVERT, and M OF N. High-level input language of FTC easy to understand and use. Program supports hierarchical fault-tree-definition feature simplifying process of description of tree and reduces execution time. Solution technique implemented in FORTRAN, and user interface in Pascal. Written to run on DEC VAX computer operating under VMS operating system.

  16. System analysis for the Huntsville Operation Support Center distributed computer system

    NASA Technical Reports Server (NTRS)

    Ingels, F. M.

    1986-01-01

    A simulation model of the NASA Huntsville Operational Support Center (HOSC) was developed. This simulation model emulates the HYPERchannel Local Area Network (LAN) that ties together the various computers of HOSC. The HOSC system is a large installation of mainframe computers such as the Perkin Elmer 3200 series and the Dec VAX series. A series of six simulation exercises of the HOSC model is described using data sets provided by NASA. The analytical analysis of the ETHERNET LAN and the video terminals (VTs) distribution system are presented. An interface analysis of the smart terminal network model which allows the data flow requirements due to VTs on the ETHERNET LAN to be estimated, is presented.

  17. Aerial of the Orion EFT-1 Arrival at KSC

    NASA Image and Video Library

    2014-12-18

    An aerial view reveals the Orion crew module, enclosed in its crew module transportation fixture and secured on a flatbed truck is passing the Space Station Processing Facility at Kennedy Space Center in Florida on its way to the Multi-Operation Support Building. Orion made the 2,700 mile overland trip from Naval Base San Diego in California. The spacecraft was recovered from the Pacific Ocean after completing a two-orbit, four-and-a-half hour mission Dec. 5 to test systems critical to crew safety, including the launch abort system, the heat shield and the parachute system. The Ground Systems Development and Operations Program led the recovery, offload and transportation efforts.

  18. An analysis of short haul airline operating costs

    NASA Technical Reports Server (NTRS)

    Kanafani, A.; Taghavi, S.

    1975-01-01

    The demand and supply characteristics of short haul air transportation systems are investigated in terms of airline operating costs. Direct, indirect, and ground handling costs are included. Supply models of short haul air transportation systems are constructed.

  19. Space station operating system study

    NASA Technical Reports Server (NTRS)

    Horn, Albert E.; Harwell, Morris C.

    1988-01-01

    The current phase of the Space Station Operating System study is based on the analysis, evaluation, and comparison of the operating systems implemented on the computer systems and workstations in the software development laboratory. Primary emphasis has been placed on the DEC MicroVMS operating system as implemented on the MicroVax II computer, with comparative analysis of the SUN UNIX system on the SUN 3/260 workstation computer, and to a limited extent, the IBM PC/AT microcomputer running PC-DOS. Some benchmark development and testing was also done for the Motorola MC68010 (VM03 system) before the system was taken from the laboratory. These systems were studied with the objective of determining their capability to support Space Station software development requirements, specifically for multi-tasking and real-time applications. The methodology utilized consisted of development, execution, and analysis of benchmark programs and test software, and the experimentation and analysis of specific features of the system or compilers in the study.

  20. A Compilation of Data on Rates of Advance in Land Combat Operations

    DTIC Science & Technology

    1990-02-01

    999.90 999.90 11032 182d AbnO 26- Dac -44 A 0.00 0.00 17.40 999.90 999.90 11033 183d ID 26-Dec-44 A 0.00 0.00 0.00 0.00 24.00 11034 84th I0 26-Dec-44 A 0.00...lPzLehrO 27-Dec-44 G 7.00 0.00 6.00 999.90 999.90 1220 XII SSK 27- Dac -44 G 0.00 0.00 0.00 0.00 24.00 1221 XLVII PzK 27-Dec-44 G 3.50 -3.50 66.40 999.90...44 A 39.00 0.00 0.00 0.00 24.00 1228 117th AbnO 28- Dac -44 A 0.00 0.00 0.00 0.00 24.00 11229 1lst Army 28-Dec-44 A 1.40 1.40 129.20 999.90 999.90 11230

  1. Regional Interagency Commands: A Whole of Government Structure for Complex Operations

    DTIC Science & Technology

    2010-03-01

    testimony/- 111thCongress/04_30_2009.asp (accessed 21 Mar 2010). 51 Charles R. Kesler, “What Separation of Powers Means for Constitutional Government”, 17...Dec 2007, http://www.heritage.org/Research/Reports/2007/12/What- Separation - of - Powers -Means-for-Constitutional-Government#_ftnref13 (accessed 29 Dec

  2. 78 FR 3031 - Amended Certification Regarding Eligibility To Apply for Worker Adjustment Assistance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-15

    ... PRINTING SYSTEMS (PPS), SUPPLY CHAIN OPERATIONS (FORMERLY KNOWN AS IWS), VANCOUVER, WA. In accordance with... Services (IWS) and Supply Chain Operations (formerly known as IWS) units. The workers within PPS (both... Group, Vancouver, Washington (TA-W-81,739A), and H-P, PPS, Supply Chain Operations, Vancouver...

  3. Orion Washdown & Arrival at LASF

    NASA Image and Video Library

    2014-12-18

    NASA's Orion spacecraft arrives inside the Launch Abort System Facility at Kennedy Space Center in Florida. The spacecraft was transported 2,700 miles overland from Naval Base San Diego in California, on a flatbed truck secured in its crew module transportation fixture for the trip. During its first flight test, Orion completed a two-orbit, four-and-a-half hour mission Dec. 5 to test systems critical to crew safety, including the launch abort system, the heat shield and the parachute system. The Ground Systems Development and Operations Program led the recovery, offload and transportation efforts.

  4. Orion Washdown & Arrival at LASF

    NASA Image and Video Library

    2014-12-18

    NASA's Orion spacecraft arrives at the Launch Abort System Facility at Kennedy Space Center in Florida. The spacecraft was transported 2,700 miles overland from Naval Base San Diego in California, on a flatbed truck secured in its crew module transportation fixture for the trip. During its first flight test, Orion completed a two-orbit, four-and-a-half hour mission Dec. 5 to test systems critical to crew safety, including the launch abort system, the heat shield and the parachute system. The Ground Systems Development and Operations Program led the recovery, offload and transportation efforts.

  5. 75 FR 21344 - Habitat Conservation Plan for City of Kent, Washington

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-23

    ... Supply System adjacent to Rock Creek, King County, Washington. The Clark Springs Water Supply System... Springs Water Supply facilities; Maintenance of 320 acres of Kent-owned property as it relates to the protection of its water supply; and Operation and maintenance of a water augmentation system for the...

  6. Honeywell Engines, Systems and Services, Phoenix, Arizona, Dec. 10, 2007 Petition to Object to Title V Operating Permit

    EPA Pesticide Factsheets

    This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Petition Database available at www2.epa.gov/title-v-operating-permits/title-v-petition-database. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.

  7. The Anaesthesia Gas Supply System

    PubMed Central

    Das, Sabyasachi; Chattopadhyay, Subhrajyoti; Bose, Payel

    2013-01-01

    The anaesthesia gas supply system is designed to provide a safe, cost-effective and convenient system for the delivery of medical gases at the point of-use. The doctrine of the anaesthesia gas supply system is based on four essential principles: Identity, continuity, adequacy and quality. Knowledge about gas supply system is an integral component of safe anaesthetic practice. Mishaps involving the malfunction or misuse of medical gas supply to operating theatres have cost many lives. The medical gases used in anaesthesia and intensive care are oxygen, nitrous oxide, medical air, entonox, carbon dioxide and heliox. Oxygen is one of the most widely used gases for life-support and respiratory therapy besides anaesthetic procedures. In this article, an effort is made to describe the production, storage and delivery of anaesthetic gases. The design of anaesthesia equipment must take into account the local conditions such as climate, demand and power supply. The operational policy of the gas supply system should have a backup plan to cater to the emergency need of the hospital, in the event of the loss of the primary source of supply. PMID:24249882

  8. Orion Returns to KSC after Successful Mission

    NASA Image and Video Library

    2014-12-18

    NASA's Orion crew module, enclosed in its crew module transportation fixture and secured on a flatbed truck nears the entrance gate to Kennedy Space Center in Florida. Orion made the overland trip from Naval Base San Diego in California. Orion was recovered from the Pacific Ocean after completing a two-orbit, four-and-a-half hour mission Dec. 5 to test systems critical to crew safety, including the launch abort system, the heat shield and the parachute system. The Ground Systems Development and Operations Program led the recovery, offload and transportation efforts.

  9. A File Archival System

    NASA Technical Reports Server (NTRS)

    Fanselow, J. L.; Vavrus, J. L.

    1984-01-01

    ARCH, file archival system for DEC VAX, provides for easy offline storage and retrieval of arbitrary files on DEC VAX system. System designed to eliminate situations that tie up disk space and lead to confusion when different programers develop different versions of same programs and associated files.

  10. 10 CFR 205.351 - Reporting requirements.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... electric power supply system. (2) Equipment failures/system operational actions attributable to the loss of... greater for purposes of maintaining the continuity of the bulk electric power supply system. (2) Reports...) or terrorism directed at an electric power supply system, local or regional, in an attempt to either...

  11. RHIC BEAM ABORT KICKER POWER SUPPLY SYSTEM COMMISSIONING EXPERIENCE AND REMAINING ISSUES.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    ZHANG,W.; AHRENS,L.A.; MI,J.

    2001-06-18

    The RHIC Beam Abort Kicker Power Supply Systems commissioning experience and the remaining issues will be reported in this paper. The RHIC Blue Ring Beam Abort Kicker Power Supply System initial commissioning took place in June 1999. Its identical system in Yellow Ring was brought on line during Spring 2000. Each of the RHIC Beam Abort Kicker Power Supply Systems consists of five high voltage modulators and subsystems. These systems are critical devices for RHIC machine protection and environmental protection. They are required to be effective, reliable and operating with sufficient redundancy to safely abort the beam to its beammore » dump at the end of accumulation or at any time when they are commanded. To deflect 66 GeV ion beam to the beam absorbers, the RHIC Beam Abort Kicker Power Supply Systems were operated at 22 kV level. The RHIC 2000 commissioning run was very successful.« less

  12. [Hygienic Inspections of Ventilation Systems Under Resting Conditions (According to DIN 1946-4:1999-03) - A Retrospective Assessment].

    PubMed

    Friedrich, Lena; Boeckelmann, Irina

    2018-01-11

    Hygienic and microbiologically sterile air quality is essential for successful guideline-based work in operating theatres. To ensure clean air and to reduce contamination during surgery, ventilation systems are indispensable. Ventilation systems should be especially designed to keep the number of particles and germs under statutory limits. Therefore, they must be operated to recognised standards of good practice and be periodically inspected and maintained. The objective of this study was to prove, through the analysis of observation outside surgery time (rest condition), the effects of ventilation systems on air quality in a medical facility. Measurements were taken in 34 operating theatres annually over a period of ten years outside surgery time (resting condition) but with the air ventilation system operating under full load. 29 operating theatres were provided with laminar air flow and five theatres with turbulent air flow systems. In each operating theatre, air cleanliness was analysed by measuring the amount of airborne particles and airborne germs. Measuring points were determined 10 mm beneath the supply-air ceiling in the centre of the operating theatre and at one position outside the supply-air ceiling. The number of airborne particles at the supply-air ceiling was between 0/m³ and 4,441/m³ of air and, as such, the limiting factor was never exceeded. However, airborne germ measurements of between 0 CFU/m³ and 200 CFU/m³ (CFU: colony forming units) demonstrated that the limiting factor for this criterion was exceeded in 10.9% of occasions. In general, the values in the middle of the room were higher than at the supply-air ceiling. There were significant differences (p < 0.001) between the values at the supply-air ceiling, the surgery table and the values outside the supply-air ceiling. The results show the positive impact of ventilation systems on the air cleanliness in operating theatres. However, laminar airflow systems seem to create cleaner air than conventional ventilation systems. The size of the supply-air ceiling plays an important role in the prevention of the contamination of the staff, the surgical field, the instrument table and the patient. However, the effect on surgical site infections has not been verified. Improved measuring methods should be considered. Georg Thieme Verlag KG Stuttgart · New York.

  13. ORION Media Event at LASF

    NASA Image and Video Library

    2014-12-19

    NASA's Orion spacecraft is viewed by members of the media at the Launch Abort System Facility at NASA's Kennedy Space Center in Florida. Speaking to the media during the viewing opportunity is Glenn Chin, Orion Production Operations. To his right is Phil Weber, with the Ground Systems Development and Operations Program, or GSDO. Orion made the 8-day, 2,700 mile overland trip back to Kennedy from Naval Base San Diego in California. Analysis of date obtained during its two-orbit, four-and-a-half hour mission Dec. 5 will provide engineers with detailed information on how the spacecraft fared. GSDO led the recovery, offload and transportation efforts.

  14. 76 FR 52871 - Pseudomonas fluorescens Strain CL145A; Exemption From the Requirement of a Tolerance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-24

    ..., hydroelectric power facility operator or water supply system operator. Potentially affected entities may include... (NAICS code 221111). Water supply and irrigation systems (NAICS code 221310). This listing is not... treatment areas are limited to completely enclosed pipe or water conveyance systems or concrete chambers...

  15. Prospects for arable farm uptake of Short Rotation Coppice willow and miscanthus in England.

    PubMed

    Glithero, Neryssa J; Wilson, Paul; Ramsden, Stephen J

    2013-07-01

    Biomass will play a role in the UK meeting EU targets on renewable energy use. Short Rotation Coppice (SRC) and miscanthus are potential biomass feedstocks; however, supply will rely on farmer willingness to grow these crops. Despite attractive crop establishment grants for dedicated energy crops (DECs) in the UK, uptake remains low. Drawing on results from an on-farm survey with 244 English arable farmers, 81.6% (87.7%) of farmers would not consider growing miscanthus (SRC), while respectively, 17.2% (11.9%) would consider growing and 1.2% (0.4%) were currently growing these crops. Farmer age, location, land ownership, farm type, farm size and farmer education level were not significant factors in determining acceptance of DECs. The main reasons cited for not growing DECs were impacts on land quality, lack of appropriate machinery, commitment of land for a long period of time, time to financial return and profitability. Reasons cited for willingness to grow DECs included land quality, ease of crop management, commitment of land for a long period of time, and profitability. Farmers cited a range of 'moral' (e.g. should not be using land for energy crops when there is a shortage of food), land quality, knowledge, profit and current farming practice comments as reasons for not growing DECs, while those willing to grow DECs cited interest in renewable energy, willingness to consider new crops, and low labour needs as rationale for their interest. Farm business objectives indicated that maximising profit and quality of life were most frequently cited as very important objectives. Previous research in the UK indicates that farmers in arable areas are unlikely to convert large areas of land to DECs, even where these farmers have an interest and willingness to grow them. Assuming that those farmers interested in growing DECs converted 9.29% (average percentage of arable land set-aside between 1996 and 2005) of their utilised agricultural area to these crops, 50,700 ha and 89,900 ha of SRC and miscanthus would, respectively, be grown on English arable farms. While farm business objectives were not identified as key determinants of DEC acceptance, enhanced information exchange through extension agents, providing market security and considering land reversion grants post-production are potential policy considerations.

  16. Prospects for arable farm uptake of Short Rotation Coppice willow and miscanthus in England

    PubMed Central

    Glithero, Neryssa J.; Wilson, Paul; Ramsden, Stephen J.

    2013-01-01

    Biomass will play a role in the UK meeting EU targets on renewable energy use. Short Rotation Coppice (SRC) and miscanthus are potential biomass feedstocks; however, supply will rely on farmer willingness to grow these crops. Despite attractive crop establishment grants for dedicated energy crops (DECs) in the UK, uptake remains low. Drawing on results from an on-farm survey with 244 English arable farmers, 81.6% (87.7%) of farmers would not consider growing miscanthus (SRC), while respectively, 17.2% (11.9%) would consider growing and 1.2% (0.4%) were currently growing these crops. Farmer age, location, land ownership, farm type, farm size and farmer education level were not significant factors in determining acceptance of DECs. The main reasons cited for not growing DECs were impacts on land quality, lack of appropriate machinery, commitment of land for a long period of time, time to financial return and profitability. Reasons cited for willingness to grow DECs included land quality, ease of crop management, commitment of land for a long period of time, and profitability. Farmers cited a range of ‘moral’ (e.g. should not be using land for energy crops when there is a shortage of food), land quality, knowledge, profit and current farming practice comments as reasons for not growing DECs, while those willing to grow DECs cited interest in renewable energy, willingness to consider new crops, and low labour needs as rationale for their interest. Farm business objectives indicated that maximising profit and quality of life were most frequently cited as very important objectives. Previous research in the UK indicates that farmers in arable areas are unlikely to convert large areas of land to DECs, even where these farmers have an interest and willingness to grow them. Assuming that those farmers interested in growing DECs converted 9.29% (average percentage of arable land set-aside between 1996 and 2005) of their utilised agricultural area to these crops, 50,700 ha and 89,900 ha of SRC and miscanthus would, respectively, be grown on English arable farms. While farm business objectives were not identified as key determinants of DEC acceptance, enhanced information exchange through extension agents, providing market security and considering land reversion grants post-production are potential policy considerations. PMID:23825896

  17. Earth Observations taken by STS-116 Crewmember

    NASA Image and Video Library

    2006-12-13

    S116-E-06081 (13 Dec. 2006) -- Backdropped against a colorful part of Earth, Progress 23 supply vehicle docked to the Zvezda Service Module's aft port of International Space Station, is featured in this image photographed by a STS-116 crewmember while Space Shuttle Discovery was docked with the station. Shark Bay, Australia is visible at lower right.

  18. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Keller, David C.; Fresquez, Philip R.; Hansen, Leslie A.

    Breeding bird abundance, species richness, evenness, diversity, composition, productivity, and survivorship were determined near a high-explosive detonation site at Los Alamos National Laboratory, New Mexico, USA, during pre-operation (1997-1999) and operation (2000-2014) periods. The operation periods consisted of detonations (<23 kg in yield and <3 per breeding season) in open air (2000-2002), within foam containment (2003-2006) and within steel vessel containment (2007-2014) systems; the latter two were employed to reduce noise and dispersal of high-explosives residues. A total of 2952 bird captures, representing 80 species, was recorded during 18 years of mist net operations using the Monitoring Avian Productivity andmore » Survivorship protocol. Individuals captured were identified to species, aged, sexed, and banded during May through August of each year. There were no significant differences (p > 0.05) in mean avian abundance and species evenness in any of the operation periods as compared with the pre-operation period. Species richness and diversity were significantly higher (p < 0.05) during the vessel containment period (2007-2014) than the pre-operation period. The time period of this study coincided with a wildfire (2000), a bark beetle infestation (2002), and two periods of drought (Nov 1999-Mar 2004 and Dec 2005-Dec 2014) that affected the study area. Furthermore, analysis of aerial photos determined that the average percent canopy cover of mature ponderosa pines (Pinus ponderosa) within 100 feet of mist net sites declined from 12% to 3% between 1991 and 2014 and the percent cover of shrubs slightly increased.« less

  19. 14 CFR 23.1309 - Equipment, systems, and installations.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... chapter and that requires a power supply is an “essential load” on the power supply. The power sources and the system must be able to supply the following power loads in probable operating combinations and for probable durations: (1) Loads connected to the power distribution system with the system functioning...

  20. Utilization and Maintenance of the Federal Catalog System (FCS)

    NASA Technical Reports Server (NTRS)

    1989-01-01

    The Federal Catalog System (FCS) was established and substantiated by law to aid the national economy and promote greater efficiency in supply management operations throughout the Federal Government. This Handbook establishes policies and procedures to be followed by NASA installations and certain contractors in cataloging items of supply in the Federal Catalog System and prescribes use of the system in supply management operations. This Handbook is not intended to duplicate the Federal Cataloging Manuals or Federal Cataloging Handbooks. For the most part, it describes actions that are peculiar to NASA.

  1. Estimates of water source contributions in a dynamic urban water supply system inferred via a Bayesian stable isotope mixing model

    NASA Astrophysics Data System (ADS)

    Jameel, M. Y.; Brewer, S.; Fiorella, R.; Tipple, B. J.; Bowen, G. J.; Terry, S.

    2017-12-01

    Public water supply systems (PWSS) are complex distribution systems and critical infrastructure, making them vulnerable to physical disruption and contamination. Exploring the susceptibility of PWSS to such perturbations requires detailed knowledge of the supply system structure and operation. Although the physical structure of supply systems (i.e., pipeline connection) is usually well documented for developed cities, the actual flow patterns of water in these systems are typically unknown or estimated based on hydrodynamic models with limited observational validation. Here, we present a novel method for mapping the flow structure of water in a large, complex PWSS, building upon recent work highlighting the potential of stable isotopes of water (SIW) to document water management practices within complex PWSS. We sampled a major water distribution system of the Salt Lake Valley, Utah, measuring SIW of water sources, treatment facilities, and numerous sites within in the supply system. We then developed a hierarchical Bayesian (HB) isotope mixing model to quantify the proportion of water supplied by different sources at sites within the supply system. Known production volumes and spatial distance effects were used to define the prior probabilities for each source; however, we did not include other physical information about the supply system. Our results were in general agreement with those obtained by hydrodynamic models and provide quantitative estimates of contributions of different water sources to a given site along with robust estimates of uncertainty. Secondary properties of the supply system, such as regions of "static" and "dynamic" source (e.g., regions supplied dominantly by one source vs. those experiencing active mixing between multiple sources), can be inferred from the results. The isotope-based HB isotope mixing model offers a new investigative technique for analyzing PWSS and documenting aspects of supply system structure and operation that are otherwise challenging to observe. The method could allow water managers to document spatiotemporal variation in PWSS flow patterns, critical for interrogating the distribution system to inform operation decision making or disaster response, optimize water supply and, monitor and enforce water rights.

  2. Study of application of space telescope science operations software for SIRTF use

    NASA Technical Reports Server (NTRS)

    Dignam, F.; Stetson, E.; Allendoerfer, W.

    1985-01-01

    The design and development of the Space Telescope Science Operations Ground System (ST SOGS) was evaluated to compile a history of lessons learned that would benefit NASA's Space Infrared Telescope Facility (SIRTF). Forty-nine specific recommendations resulted and were categorized as follows: (1) requirements: a discussion of the content, timeliness and proper allocation of the system and segment requirements and the resulting impact on SOGS development; (2) science instruments: a consideration of the impact of the Science Instrument design and data streams on SOGS software; and (3) contract phasing: an analysis of the impact of beginning the various ST program segments at different times. Approximately half of the software design and source code might be useable for SIRTF. Transportability of this software requires, at minimum, a compatible DEC VAX-based architecture and VMS operating system, system support software similar to that developed for SOGS, and continued evolution of the SIRTF operations concept and requirements such that they remain compatible with ST SOGS operation.

  3. Occurrence of diarrhoeagenic Escherichia coli virulence genes in water and bed sediments of a river used by communities in Gauteng, South Africa.

    PubMed

    Abia, Akebe Luther King; Ubomba-Jaswa, Eunice; Momba, Maggy Ndombo Benteke

    2016-08-01

    In most developing countries, especially in Southern Africa, little is known about the presence of diarrhoeagenic Escherichia coli (DEC) pathotypes in riverbed sediments. The present study sought to investigate the presence of DEC virulence genes in riverbed sediments of the Apies River, a river used by many communities in Gauteng, South Africa. Water and sediment samples were collected from the river between July and August 2013 (dry season) and also between January and February 2014 (wet season) following standard procedures. Isolation of E. coli was done using the Colilert®-18 Quanti-Tray® 2000 system. DNA was extracted from E. coli isolates using the InstaGene™ matrix from Bio-Rad and used as template DNA for real-time PCR. Water pH, temperature, dissolved oxygen, electrical conductivity and turbidity were measured in situ. Over 59 % of 180 samples analysed were positive for at least one of the seven DEC virulence genes investigated. The eaeA gene was the most isolated gene (29.44 %) while the ipaH gene the least isolated (8.33 %). The ipaH gene (p = 0.012) and the ST gene (stIa, p = 0.0001, and stIb, p = 0.019) were positively correlated with temperature. The detection of diarrhoeagenic E. coli virulence genes in the sediments of the Apies River shows that the sediments of this river might not only be a reservoir of faecal indicator bacteria like E. coli but also pathogenic strains of this bacterium. These organisms could represent a public health risk for poor communities relying on this water source for various purposes such as drinking and recreational use. There is therefore an urgent need to monitor these DEC pathotypes especially in areas without adequate water supplies.

  4. ARC2D - EFFICIENT SOLUTION METHODS FOR THE NAVIER-STOKES EQUATIONS (DEC RISC ULTRIX VERSION)

    NASA Technical Reports Server (NTRS)

    Biyabani, S. R.

    1994-01-01

    ARC2D is a computational fluid dynamics program developed at the NASA Ames Research Center specifically for airfoil computations. The program uses implicit finite-difference techniques to solve two-dimensional Euler equations and thin layer Navier-Stokes equations. It is based on the Beam and Warming implicit approximate factorization algorithm in generalized coordinates. The methods are either time accurate or accelerated non-time accurate steady state schemes. The evolution of the solution through time is physically realistic; good solution accuracy is dependent on mesh spacing and boundary conditions. The mathematical development of ARC2D begins with the strong conservation law form of the two-dimensional Navier-Stokes equations in Cartesian coordinates, which admits shock capturing. The Navier-Stokes equations can be transformed from Cartesian coordinates to generalized curvilinear coordinates in a manner that permits one computational code to serve a wide variety of physical geometries and grid systems. ARC2D includes an algebraic mixing length model to approximate the effect of turbulence. In cases of high Reynolds number viscous flows, thin layer approximation can be applied. ARC2D allows for a variety of solutions to stability boundaries, such as those encountered in flows with shocks. The user has considerable flexibility in assigning geometry and developing grid patterns, as well as in assigning boundary conditions. However, the ARC2D model is most appropriate for attached and mildly separated boundary layers; no attempt is made to model wake regions and widely separated flows. The techniques have been successfully used for a variety of inviscid and viscous flowfield calculations. The Cray version of ARC2D is written in FORTRAN 77 for use on Cray series computers and requires approximately 5Mb memory. The program is fully vectorized. The tape includes variations for the COS and UNICOS operating systems. Also included is a sample routine for CONVEX computers to emulate Cray system time calls, which should be easy to modify for other machines as well. The standard distribution media for this version is a 9-track 1600 BPI ASCII Card Image format magnetic tape. The Cray version was developed in 1987. The IBM ES/3090 version is an IBM port of the Cray version. It is written in IBM VS FORTRAN and has the capability of executing in both vector and parallel modes on the MVS/XA operating system and in vector mode on the VM/XA operating system. Various options of the IBM VS FORTRAN compiler provide new features for the ES/3090 version, including 64-bit arithmetic and up to 2 GB of virtual addressability. The IBM ES/3090 version is available only as a 9-track, 1600 BPI IBM IEBCOPY format magnetic tape. The IBM ES/3090 version was developed in 1989. The DEC RISC ULTRIX version is a DEC port of the Cray version. It is written in FORTRAN 77 for RISC-based Digital Equipment platforms. The memory requirement is approximately 7Mb of main memory. It is available in UNIX tar format on TK50 tape cartridge. The port to DEC RISC ULTRIX was done in 1990. COS and UNICOS are trademarks and Cray is a registered trademark of Cray Research, Inc. IBM, ES/3090, VS FORTRAN, MVS/XA, and VM/XA are registered trademarks of International Business Machines. DEC and ULTRIX are registered trademarks of Digital Equipment Corporation.

  5. Permanent split capacitor single phase electric motor system

    DOEpatents

    Kirschbaum, Herbert S.

    1984-01-01

    A permanent split capacitor single phase electric motor achieves balanced operation at more than one operating point by adjusting the voltage supplied to the main and auxiliary windings and adjusting the capacitance in the auxiliary winding circuit. An intermediate voltage tap on an autotransformer supplies voltage to the main winding for low speed operation while a capacitive voltage divider is used to adjust the voltage supplied to the auxiliary winding for low speed operation.

  6. The assessment of exploitation process of power for access control system

    NASA Astrophysics Data System (ADS)

    Wiśnios, Michał; Paś, Jacek

    2017-10-01

    The safety of public utility facilities is a function not only of effectiveness of the electronic safety systems, used for protection of property and persons, but it also depends on the proper functioning of their power supply systems. The authors of the research paper analysed the power supply systems, which are used in buildings for the access control system that is integrated with the closed-circuit TV. The Access Control System is a set of electronic, electromechanical and electrical devices and the computer software controlling the operation of the above-mentioned elements, which is aimed at identification of people, vehicles allowed to cross the boundary of the reserved area, to prevent from crossing the reserved area and to generate the alarm signal informing about the attempt of crossing by an unauthorised entity. The industrial electricity with appropriate technical parameters is a basis of proper functioning of safety systems. Only the electricity supply to the systems is not equivalent to the operation continuity provision. In practice, redundant power supply systems are used. In the carried out reliability analysis of the power supply system, various power circuits of the system were taken into account. The reliability and operation requirements for this type of system were also included.

  7. Optimization of urban water supply portfolios combining infrastructure capacity expansion and water use decisions

    NASA Astrophysics Data System (ADS)

    Medellin-Azuara, J.; Fraga, C. C. S.; Marques, G.; Mendes, C. A.

    2015-12-01

    The expansion and operation of urban water supply systems under rapidly growing demands, hydrologic uncertainty, and scarce water supplies requires a strategic combination of various supply sources for added reliability, reduced costs and improved operational flexibility. The design and operation of such portfolio of water supply sources merits decisions of what and when to expand, and how much to use of each available sources accounting for interest rates, economies of scale and hydrologic variability. The present research provides a framework and an integrated methodology that optimizes the expansion of various water supply alternatives using dynamic programming and combining both short term and long term optimization of water use and simulation of water allocation. A case study in Bahia Do Rio Dos Sinos in Southern Brazil is presented. The framework couples an optimization model with quadratic programming model in GAMS with WEAP, a rain runoff simulation models that hosts the water supply infrastructure features and hydrologic conditions. Results allow (a) identification of trade offs between cost and reliability of different expansion paths and water use decisions and (b) evaluation of potential gains by reducing water system losses as a portfolio component. The latter is critical in several developing countries where water supply system losses are high and often neglected in favor of more system expansion. Results also highlight the potential of various water supply alternatives including, conservation, groundwater, and infrastructural enhancements over time. The framework proves its usefulness for planning its transferability to similarly urbanized systems.

  8. System Statement of Tasks of Calculating and Providing the Reliability of Heating Cogeneration Plants in Power Systems

    NASA Astrophysics Data System (ADS)

    Biryuk, V. V.; Tsapkova, A. B.; Larin, E. A.; Livshiz, M. Y.; Sheludko, L. P.

    2018-01-01

    A set of mathematical models for calculating the reliability indexes of structurally complex multifunctional combined installations in heat and power supply systems was developed. Reliability of energy supply is considered as required condition for the creation and operation of heat and power supply systems. The optimal value of the power supply system coefficient F is based on an economic assessment of the consumers’ loss caused by the under-supply of electric power and additional system expences for the creation and operation of an emergency capacity reserve. Rationing of RI of the industrial heat supply is based on the use of concept of technological margin of safety of technological processes. The definition of rationed RI values of heat supply of communal consumers is based on the air temperature level iside the heated premises. The complex allows solving a number of practical tasks for providing reliability of heat supply for consumers. A probabilistic model is developed for calculating the reliability indexes of combined multipurpose heat and power plants in heat-and-power supply systems. The complex of models and calculation programs can be used to solve a wide range of specific tasks of optimization of schemes and parameters of combined heat and power plants and systems, as well as determining the efficiency of various redundance methods to ensure specified reliability of power supply.

  9. Financial Management: Naval Air Systems Command Financial Reporting of Non-Ammunition Operating Material and Supplies for FY 2002

    DTIC Science & Technology

    2002-11-08

    Financial Management November 8, 2002 Office of the Inspector General of the Department of Defense Naval Air Systems Command Financial Reporting of...from... to) - Title and Subtitle Financial Management: Naval Air Systems Command Financial Reporting of Non-Ammunition Operating Material and...This report is the first in a series of planned reports and discusses the financial reporting of non-ammunition operating materials and supplies

  10. IRAF and STSDAS under the new ALPHA architecture

    NASA Technical Reports Server (NTRS)

    Zarate, N. R.

    1992-01-01

    Digital's next generation RISC architecture, known as ALPHA, presents many IRAF system portability questions and challenges to both site managers and end users. DEC promises to support the ULTRIX, VMS, and OSF/1 operating systems, which should allow IRAF to be ported to the new architecture at either the program executable level (using VEST), or at the source level, where IRAF can be tuned for greater performance. These notes highlight some of the details of porting IRAF to OpenVMS on the ALPHA architecture.

  11. ORION Media Event at LASF

    NASA Image and Video Library

    2014-12-19

    The U.S. Flag is in view on NASA's Orion spacecraft inside the Launch Abort System Facility at NASA's Kennedy Space Center in Florida during a media event. Orion made the 8-day, 2,700 mile overland trip back to Kennedy from Naval Base San Diego in California. Analysis of date obtained during its two-orbit, four-and-a-half hour mission Dec. 5 will provide engineers with detailed information on how the spacecraft fared. The Ground Systems Development and Operations Program led the recovery, offload and transportation efforts.

  12. ORION Media Event at LASF

    NASA Image and Video Library

    2014-12-19

    NASA's Orion spacecraft is viewed by members of the media at the Launch Abort System Facility at NASA's Kennedy Space Center in Florida. Orion made the 8-day, 2,700 mile overland trip back to Kennedy from Naval Base San Diego in California. Analysis of date obtained during its two-orbit, four-and-a-half hour mission Dec. 5 will provide engineers detailed information on how the spacecraft fared. The Ground Systems Development and Operations Program led the recovery, offload and transportation efforts.

  13. ORION Media Event at LASF

    NASA Image and Video Library

    2014-12-19

    NASA's Orion spacecraft is viewed by members of the media at the Launch Abort System Facility at NASA's Kennedy Space Center in Florida. Orion made the 8-day, 2,700 mile overland trip back to Kennedy from Naval Base San Diego in California. Analysis of date obtained during its two-orbit, four-and-a-half hour mission Dec. 5 will provide engineers with detailed information on how the spacecraft fared. The Ground Systems Development and Operations Program led the recovery, offload and transportation efforts.

  14. ORION Media Event at LASF

    NASA Image and Video Library

    2014-12-19

    NASA's Orion spacecraft has been uncrated and is inside the Launch Abort System Facility at NASA's Kennedy Space Center in Florida during a media event. Orion made the 8-day, 2,700 mile overland trip back to Kennedy from Naval Base San Diego in California. Analysis of date obtained during its two-orbit, four-and-a-half hour mission Dec. 5 will provide engineers detailed information on how the spacecraft fared. The Ground Systems Development and Operations Program led the recovery, offload and transportation efforts.

  15. JPRS Report Arms Control

    DTIC Science & Technology

    1990-01-08

    significance that they will jointly work on creation of a Europe of peace and cooperation: on the "European peace system," or the "common European home " in...Disarmament [ ADN 13 Dec] 7 Disarmament Consultations End 9th Round [ ADN 13 Dec] 7 GDR’s Hoffmann: NATO Must Also Disarm [NEUES DEUTSCHLAND...30 Nov] .. 7 Personnel Changes Made at Defense Ministry [ ADN 29 Dec] 7 Defense Minister Approves Total Disarmament [ ADN 21 Dec] 8 HUNGARY

  16. Program For Engineering Electrical Connections

    NASA Technical Reports Server (NTRS)

    Billitti, Joseph W.

    1990-01-01

    DFACS is interactive multiuser computer-aided-engineering software tool for system-level electrical integration and cabling engineering. Purpose of program to provide engineering community with centralized data base for putting in and gaining access to data on functional definition of system, details of end-circuit pinouts in systems and subsystems, and data on wiring harnesses. Objective, to provide instantaneous single point of interchange of information, thus avoiding error-prone, time-consuming, and costly shuttling of data along multiple paths. Designed to operate on DEC VAX mini or micro computer using Version 5.0/03 of INGRES.

  17. 48 CFR 970.0309-1 - Applicability.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Improper Business Practices and Personal Conflicts of... applicability of the DOE Employee Protection Program to management and operating contracts. [65 FR 81009, Dec...

  18. NJE; VAX-VMS IBM NJE network protocol emulator. [DEC VAX11/780; VAX-11 FORTRAN 77 (99%) and MACRO-11 (1%)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Engert, D.E.; Raffenetti, C.

    NJE is communications software developed to enable a VAX VMS system to participate as an end-node in a standard IBM network by emulating the Network Job Entry (NJE) protocol. NJE supports job networking for the operating systems used on most large IBM-compatible computers (e.g., VM/370, MVS with JES2 or JES3, SVS, MVT with ASP or HASP). Files received by the VAX can be printed or saved in user-selected disk files. Files sent to the network can be routed to any network node for printing, punching, or job submission, or to a VM/370 user's virtual reader. Files sent from the VAXmore » are queued and transmitted asynchronously. No changes are required to the IBM software.DEC VAX11/780; VAX-11 FORTRAN 77 (99%) and MACRO-11 (1%); VMS 2.5; VAX11/780 with DUP-11 UNIBUS interface and 9600 baud synchronous modem..« less

  19. Master's Degree in Management Information Systems with a Supply Chain Management Focus

    ERIC Educational Resources Information Center

    Ramaswamy, Kizhanatham V.; Boyd, Joseph L.; Desai, Mayur

    2007-01-01

    A graduate curriculum in Management Information Systems with a Supply Chain Management focus is presented. The motivation for this endeavor stems from the fact that the global scope of modern business organizations and the competitive environment in which they operate, requires an information system leveraged supply chain management system (SCM)…

  20. Permanent split capacitor single phase electric motor system

    DOEpatents

    Kirschbaum, H.S.

    1984-08-14

    A permanent split capacitor single phase electric motor achieves balanced operation at more than one operating point by adjusting the voltage supplied to the main and auxiliary windings and adjusting the capacitance in the auxiliary winding circuit. An intermediate voltage tap on an autotransformer supplies voltage to the main winding for low speed operation while a capacitive voltage divider is used to adjust the voltage supplied to the auxiliary winding for low speed operation. 4 figs.

  1. Lignocellulosic crop supply chains (eg, Miscanthus, switchgrass, reed canary grass, rye, giant reed, etc.) Chapter 12 of "Biomass Supply Chains for Bioenergy and Biorefining"

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Roni, Mohammad S.; Cafferty, Kara G.; Hess, J. Richard

    This chapter provides an overview of lignocellulosic crop supply chains such as Miscanthus, switch grass, reed canary grass, rye, and giant reed by outlining typical logistic operations in support of a liquid biofuel market. We present two strategies for managing feedstocks within the biomass supply system: (1) the conventional bale feedstock supply system and (2) the advanced supply system concept. Finally, we discuss feedstock blending and integrated landscape management as innovative improvements to the lignocellulosic crop supply chain.

  2. Avian community composition in response to high explosive testing operations at Los Alamos National Laboratory in Northern New Mexico

    DOE PAGES

    Keller, David C.; Fresquez, Philip R.; Hansen, Leslie A.; ...

    2015-12-28

    Breeding bird abundance, species richness, evenness, diversity, composition, productivity, and survivorship were determined near a high-explosive detonation site at Los Alamos National Laboratory, New Mexico, USA, during pre-operation (1997-1999) and operation (2000-2014) periods. The operation periods consisted of detonations (<23 kg in yield and <3 per breeding season) in open air (2000-2002), within foam containment (2003-2006) and within steel vessel containment (2007-2014) systems; the latter two were employed to reduce noise and dispersal of high-explosives residues. A total of 2952 bird captures, representing 80 species, was recorded during 18 years of mist net operations using the Monitoring Avian Productivity andmore » Survivorship protocol. Individuals captured were identified to species, aged, sexed, and banded during May through August of each year. There were no significant differences (p > 0.05) in mean avian abundance and species evenness in any of the operation periods as compared with the pre-operation period. Species richness and diversity were significantly higher (p < 0.05) during the vessel containment period (2007-2014) than the pre-operation period. The time period of this study coincided with a wildfire (2000), a bark beetle infestation (2002), and two periods of drought (Nov 1999-Mar 2004 and Dec 2005-Dec 2014) that affected the study area. Furthermore, analysis of aerial photos determined that the average percent canopy cover of mature ponderosa pines (Pinus ponderosa) within 100 feet of mist net sites declined from 12% to 3% between 1991 and 2014 and the percent cover of shrubs slightly increased.« less

  3. 14 CFR 25.1310 - Power source capacity and distribution.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... certification or under operating rules and that requires a power supply is an “essential load” on the power supply. The power sources and the system must be able to supply the following power loads in probable... source of power is required, after any failure or malfunction in any one power supply system...

  4. 14 CFR 25.1310 - Power source capacity and distribution.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... certification or under operating rules and that requires a power supply is an “essential load” on the power supply. The power sources and the system must be able to supply the following power loads in probable... source of power is required, after any failure or malfunction in any one power supply system...

  5. Long-pulse power-supply system for EAST neutral-beam injectors

    NASA Astrophysics Data System (ADS)

    Liu, Zhimin; Jiang, Caichao; Pan, Junjun; Liu, Sheng; Xu, Yongjian; Chen, Shiyong; Hu, Chundong; NBI Team

    2017-05-01

    The long-pulse power-supply system equipped for the 4 MW beam-power ion source is comprised of three units at ASIPP (Institute of Plasma Physics, Chinese Academy of Sciences): one for the neutral-beam test stand and two for the EAST neutral-beam injectors (NBI-1 and NBI-2, respectively). Each power supply system consists of two low voltage and high current DC power supplies for plasma generation of the ion source, and two high voltage and high current DC power supplies for the accelerator grid system. The operation range of the NB power supply is about 80 percent of the design value, which is the safe and stable operation range. At the neutral-beam test stand, a hydrogen ion beam with a beam pulse of 150 s, beam power of 1.5 MW and beam energy of 50 keV was achieved during the long-pulse testing experiments. The result shows that the power-supply system meets the requirements of the EAST-NBIs fully and lays a basis for achieving plasma heating.

  6. Fuel quantity modulation in pilot ignited engines

    DOEpatents

    May, Andrew

    2006-05-16

    An engine system includes a first fuel regulator adapted to control an amount of a first fuel supplied to the engine, a second fuel regulator adapted to control an amount of a second fuel supplied to the engine concurrently with the first fuel being supplied to the engine, and a controller coupled to at least the second fuel regulator. The controller is adapted to determine the amount of the second fuel supplied to the engine in a relationship to the amount of the first fuel supplied to the engine to operate in igniting the first fuel at a specified time in steady state engine operation and adapted to determine the amount of the second fuel supplied to the engine in a manner different from the relationship at steady state engine operation in transient engine operation.

  7. KSC01PD1781

    NASA Image and Video Library

    2001-12-05

    KENNEDY SPACE CENTER, Fla. -- STS-108 Mission Specialist Daniel M. Tani is happy to be suiting up for the second launch attempt of Space Shuttle Endeavour. The first attempt Dec. 4 was scrubbed due to poor weather conditions at KSC. The main goals of the mission are to carry the Expedition 4 crew to the International Space Station as replacement for Expedition 3; carry the Multi-Purpose Logistics Module Raffaello filled with water, equipment and supplies; and install thermal blankets over equipment at the base of the ISS solar wings. STS-108 is the final Shuttle mission of 2001 and the 107th Shuttle flight overall. It is the 12th flight to the Space Station. Launch is scheduled for 5:19 p.m. EST (22:19 GMT) Dec. 5, 2001, from Launch Pad 39B

  8. DET/MPS - THE GSFC ENERGY BALANCE PROGRAM, DIRECT ENERGY TRANSFER/MULTIMISSION SPACECRAFT MODULAR POWER SYSTEM (UNIX VERSION)

    NASA Technical Reports Server (NTRS)

    Jagielski, J. M.

    1994-01-01

    The DET/MPS programs model and simulate the Direct Energy Transfer and Multimission Spacecraft Modular Power System in order to aid both in design and in analysis of orbital energy balance. Typically, the DET power system has the solar array directly to the spacecraft bus, and the central building block of MPS is the Standard Power Regulator Unit. DET/MPS allows a minute-by-minute simulation of the power system's performance as it responds to various orbital parameters, focusing its output on solar array output and battery characteristics. While this package is limited in terms of orbital mechanics, it is sufficient to calculate eclipse and solar array data for circular or non-circular orbits. DET/MPS can be adjusted to run one or sequential orbits up to about one week, simulated time. These programs have been used on a variety of Goddard Space Flight Center spacecraft projects. DET/MPS is written in FORTRAN 77 with some VAX-type extensions. Any FORTRAN 77 compiler that includes VAX extensions should be able to compile and run the program with little or no modifications. The compiler must at least support free-form (or tab-delineated) source format and 'do do-while end-do' control structures. DET/MPS is available for three platforms: GSC-13374, for DEC VAX series computers running VMS, is available in DEC VAX Backup format on a 9-track 1600 BPI tape (standard distribution) or TK50 tape cartridge; GSC-13443, for UNIX-based computers, is available on a .25 inch streaming magnetic tape cartridge in UNIX tar format; and GSC-13444, for Macintosh computers running AU/X with either the NKR FORTRAN or AbSoft MacFORTRAN II compilers, is available on a 3.5 inch 800K Macintosh format diskette. Source code and test data are supplied. The UNIX version of DET requires 90K of main memory for execution. DET/MPS was developed in 1990. A/UX and Macintosh are registered trademarks of Apple Computer, Inc. VMS, DEC VAX and TK50 are trademarks of Digital Equipment Corporation. UNIX is a registered trademark of AT&T Bell Laboratories.

  9. DET/MPS - THE GSFC ENERGY BALANCE PROGRAM, DIRECT ENERGY TRANSFER/MULTIMISSION SPACECRAFT MODULAR POWER SYSTEM (MACINTOSH A/UX VERSION)

    NASA Technical Reports Server (NTRS)

    Jagielski, J. M.

    1994-01-01

    The DET/MPS programs model and simulate the Direct Energy Transfer and Multimission Spacecraft Modular Power System in order to aid both in design and in analysis of orbital energy balance. Typically, the DET power system has the solar array directly to the spacecraft bus, and the central building block of MPS is the Standard Power Regulator Unit. DET/MPS allows a minute-by-minute simulation of the power system's performance as it responds to various orbital parameters, focusing its output on solar array output and battery characteristics. While this package is limited in terms of orbital mechanics, it is sufficient to calculate eclipse and solar array data for circular or non-circular orbits. DET/MPS can be adjusted to run one or sequential orbits up to about one week, simulated time. These programs have been used on a variety of Goddard Space Flight Center spacecraft projects. DET/MPS is written in FORTRAN 77 with some VAX-type extensions. Any FORTRAN 77 compiler that includes VAX extensions should be able to compile and run the program with little or no modifications. The compiler must at least support free-form (or tab-delineated) source format and 'do do-while end-do' control structures. DET/MPS is available for three platforms: GSC-13374, for DEC VAX series computers running VMS, is available in DEC VAX Backup format on a 9-track 1600 BPI tape (standard distribution) or TK50 tape cartridge; GSC-13443, for UNIX-based computers, is available on a .25 inch streaming magnetic tape cartridge in UNIX tar format; and GSC-13444, for Macintosh computers running AU/X with either the NKR FORTRAN or AbSoft MacFORTRAN II compilers, is available on a 3.5 inch 800K Macintosh format diskette. Source code and test data are supplied. The UNIX version of DET requires 90K of main memory for execution. DET/MPS was developed in 1990. A/UX and Macintosh are registered trademarks of Apple Computer, Inc. VMS, DEC VAX and TK50 are trademarks of Digital Equipment Corporation. UNIX is a registered trademark of AT&T Bell Laboratories.

  10. 48 CFR 970.3605-1 - Other contracts.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Construction and Architect-Engineer Contracts... management and operating contracts. [65 FR 81009, Dec. 22, 2000, as amended at 74 FR 36374, July 22, 2009] ...

  11. 48 CFR 970.3605-1 - Other contracts.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Construction and Architect-Engineer Contracts... management and operating contracts. [65 FR 81009, Dec. 22, 2000, as amended at 74 FR 36374, July 22, 2009] ...

  12. 48 CFR 970.3605-1 - Other contracts.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Construction and Architect-Engineer Contracts... management and operating contracts. [65 FR 81009, Dec. 22, 2000, as amended at 74 FR 36374, July 22, 2009] ...

  13. ORION Media Event at LASF

    NASA Image and Video Library

    2014-12-19

    NASA's Orion spacecraft is viewed by members of the media at the Launch Abort System Facility at NASA's Kennedy Space Center in Florida. Speaking to the media during the viewing opportunity is Jules Schneider, Lockheed Martin Manager. Behind him, from left, are Glenn Chin, Orion Production Operations manager and Phil Weber and Lou Garcia, with the Ground Systems Development and Operations Program, or GSDO. Orion made the 8-day, 2,700 mile overland trip back to Kennedy from Naval Base San Diego in California. Analysis of date obtained during its two-orbit, four-and-a-half hour mission Dec. 5 will provide engineers with detailed information on how the spacecraft fared. GSDO led the recovery, offload and transportation efforts.

  14. ORION Media Event at LASF

    NASA Image and Video Library

    2014-12-19

    NASA's Orion spacecraft is viewed by members of the media at the Launch Abort System Facility at NASA's Kennedy Space Center in Florida. Speaking to the media during the viewing opportunity is Phil Weber, with the Ground Systems Development and Operations Program, or GSDO. At left is Jules Schneider, Lockheed Martin manager. At right is Glenn Chin, Orion Production Operations, and Lou Garcia, with GSDO. Orion made the 8-day, 2,700 mile overland trip back to Kennedy from Naval Base San Diego in California. Analysis of date obtained during its two-orbit, four-and-a-half hour mission Dec. 5 will provide engineers detailed information on how the spacecraft fared. GSDO led the recovery, offload and transportation efforts.

  15. KSC-2014-4875

    NASA Image and Video Library

    2014-12-19

    CAPE CANAVERAL, Fla. -- NASA's Orion spacecraft is viewed by members of the media at the Launch Abort System Facility at NASA's Kennedy Space Center in Florida. Speaking to the media during the viewing opportunity is Glenn Chin, Orion Production Operations. To his right is Phil Weber, with the Ground Systems Development and Operations Program, or GSDO. Orion made the 8-day, 2,700 mile overland trip back to Kennedy from Naval Base San Diego in California. Analysis of date obtained during its two-orbit, four-and-a-half hour mission Dec. 5 will provide engineers with detailed information on how the spacecraft fared. GSDO led the recovery, offload and transportation efforts. For more information, visit www.nasa.gov/orion. Photo credit: NASA/Dimitri Gerondidakis

  16. Parenteral glutamine supplement has synergic effects in minimally invasive surgery of subtotal gastrectomy patients.

    PubMed

    Chen, Chien-Chia; Chang, Tung-Cheng; Wang, Ming-Yang; Wu, Ming-Hsun; Lin, Ming-Tsan

    2012-09-01

    Exogenous glutamine supplement is known to improve morbidity and mortality of critically-ill patients. This study was conducted to elucidate the role of glutamine in minimally invasive surgery. We retrospectively reviewed subtotal gastrectomy patients in National Taiwan University Hospital from Dec 2005 to Dec 2008. The patients were divided into three groups. Group 1 underwent subtotal gastrectomy by laparotomy without glutamine supplement, group 2 underwent subtotal gastrectomy by laparotomy with glutamine supplement and group 3 underwent gasless laparoscopy-assisted subtotal gastrectomy with parenteral glutamine supplement. There were 155 patients in total; 85 patients in group 1, 17 in group 2 and 53 in group 3. The mean flatus days after operation are 3.6, 3.1 and 2.8 for groups 1, 2 and 3, respectively (p=0.001). Oral intake after operation was commenced after 6.7, 5.0 and 4.7 days (p=0.006). The body temperature had borderline differences between groups 3 and 1. There were significant differences in postoperative systemic responses including heart rates (p<0.001) and tenderness (p=0.011) 5 days after operation for group 3 vs. group 1. Minimally invasive surgery was a negative factor for postoperative body temperature change. Glutamine was a significant factor for postoperative heart rate change and reduction of tenderness. Glutamine supplement may have synergic effects of rapid recovery in minimal invasive surgery for subtotal gastrectomy patients by minimizing the postoperative systemic response and accelerating recovery.

  17. The value of supply chain coordination under moral hazard: A case study of the consumer product supply chain.

    PubMed

    Lee, Yumi; Song, Sang Hwa; Cheong, Taesu

    2018-01-01

    In this paper, we examine a real-world case related to the consumer product supply chain to analyze the value of supply chain coordination under the condition of moral hazard. Because of the characteristics of a buyback contract scheme employed in the supply chain, the supplier company's sales department encourages retailers to order more inventory to meet their sales target, whereas retailers pay less attention to their inventory level and leftovers at the end of the season. This condition induces moral hazard problems in the operation of the supply chain, as suppliers suffer from huge returns of leftover inventory. This, in turn, is related to the obsolescence of returned inventory, even with penalty terms in the contract for the return of any leftovers. In this study, we show under the current buyback-based supply chain operation, the inventory levels of both the supplier and retailers exceed customer demand and develop vendor-managed inventory (VMI) system with base stock policy to remove any mismatch of supply and demand. A comparison of both systems shows that through the proper coordination of supply chain operations, both suppliers and retailers can gain additional benefits while providing proper services to end customers.

  18. Financial Management: Ordnance Accountability at Fleet Combat Training Center Atlantic (D-2003-084)

    DTIC Science & Technology

    2003-04-29

    13, 1994. This report is the third report in a series resulting from an audit of the financial reporting of operating materials and supplies. The first...report discusses the Naval Air System Command’s financial reporting of non-ordnance operating materials and supplies. The second report discusses...Navy efforts to improve the financial reporting of its conventional ordnance portion of operating materials and supplies and its conventional ordnance

  19. Development and Use of the Hydrologic Ensemble Forecast System by the National Weather Service to Support the New York City Water Supply

    NASA Astrophysics Data System (ADS)

    Shedd, R.; Reed, S. M.; Porter, J. H.

    2015-12-01

    The National Weather Service (NWS) has been working for several years on the development of the Hydrologic Ensemble Forecast System (HEFS). The objective of HEFS is to provide ensemble river forecasts incorporating the best precipitation and temperature forcings at any specific time horizon. For the current implementation, this includes the Global Ensemble Forecast System (GEFS) and the Climate Forecast System (CFSv2). One of the core partners that has been working with the NWS since the beginning of the development phase of HEFS is the New York City Department of Environmental Protection (NYCDEP) which is responsible for the complex water supply system for New York City. The water supply system involves a network of reservoirs in both the Delaware and Hudson River basins. At the same time that the NWS was developing HEFS, NYCDEP was working on enhancing the operations of their water supply reservoirs through the development of a new Operations Support Tool (OST). OST is designed to guide reservoir system operations to ensure an adequate supply of high-quality drinking water for the city, as well as to meet secondary objectives for reaches downstream of the reservoirs assuming the primary water supply goals can be met. These secondary objectives include fisheries and ecosystem support, enhanced peak flow attenuation beyond that provided natively by the reservoirs, salt front management, and water supply for other cities. Since January 2014, the NWS Northeast and Middle Atlantic River Forecast Centers have provided daily one year forecasts from HEFS to NYCDEP. OST ingests these forecasts, couples them with near-real-time environmental and reservoir system data, and drives models of the water supply system. The input of ensemble forecasts results in an ensemble of model output, from which information on the range and likelihood of possible future system states can be extracted. This type of probabilistic information provides system managers with additional information not available from deterministic forecasts and allows managers to better assess risk, and provides greater context for decision-making than has been available in the past. HEFS has allowed NYCDEP water supply managers to make better decisions on reservoir operations than they likely would have in the past, using only deterministic forecasts.

  20. Model simulation of the Manasquan water-supply system in Monmouth County, New Jersey

    USGS Publications Warehouse

    Chang, Ming; Tasker, Gary D.; Nieswand, Steven

    2001-01-01

    Model simulation of the Manasquan Water Supply System in Monmouth County, New Jersey, was completed using historic hydrologic data to evaluate the effects of operational and withdrawal alternatives on the Manasquan reservoir and pumping system. Changes in the system operations can be simulated with the model using precipitation forecasts. The Manasquan Reservoir system model operates by using daily streamflow values, which were reconstructed from historical U.S. Geological Survey streamflow-gaging station records. The model is able to run in two modes--General Risk analysis Model (GRAM) and Position Analysis Model (POSA). The GRAM simulation procedure uses reconstructed historical streamflow records to provide probability estimates of certain events, such as reservoir storage levels declining below a specific level, when given an assumed set of operating rules and withdrawal rates. POSA can be used to forecast the likelihood of specified outcomes, such as streamflows falling below statutory passing flows, associated with a specific working plan for the water-supply system over a period of months. The user can manipulate the model and generate graphs and tables of streamflows and storage, for example. This model can be used as a management tool to facilitate the development of drought warning and drought emergency rule curves and safe yield values for the water-supply system.

  1. System and method for advanced power management

    DOEpatents

    Atcitty, Stanley [Albuquerque, NM; Symons, Philip C [Surprise, AZ; Butler, Paul C [Albuquerque, NM; Corey, Garth P [Albuquerque, NM

    2009-07-28

    A power management system is provided that includes a power supply means comprising a plurality of power supply strings, a testing means operably connected to said plurality of power supply strings for evaluating performance characteristics of said plurality of power supply strings, and a control means for monitoring power requirements and comprising a switching means for controlling switching of said plurality of power supply strings to said testing means.

  2. Design and operating experience of a 40 MW, highly-stabilized power supply

    NASA Astrophysics Data System (ADS)

    Boenig, Heinrich J.; Ferner, James A.; Bogdan, Ferenc; Morris, Gary C.; Rumrill, Ron S.

    Four 10 MW, highly-stabilized power supply modules have been installed at the National High Magnetic Field Laboratory in Tallahassee, FL, to energize water-cooled, resistive, high-field research magnets. The power supply modules achieve a long term current stability if 10 ppM over a 12 h period with a short term ripple and noise variation of less than 10 ppM over a time period of one cycle. The power supply modules can operate independently, feeding four separate magnets, or two, three or four modules can operate in parallel. Each power supply module consists of a 12.5 kV vacuum circuit breaker, two three-winding, step-down transformers, a 24-pulse rectifier with interphase reactors, and a passive and an active filter. Two different transformer tap settings allow rated dc supply output voltages of 400 and 500 V. The rated current of a supply module is 17 kA and each supply module has a one-hour overload capability of 20 kA. The isolated output terminals of each power supply module are connected to a reversing switch. An extensive high-current bus system allows the modules to be connected to 16 magnet cells. This paper presents the detailed design of the power supply components. Various test results taken during the commissioning phase with a 10 MW resistive load and results taken with the research magnets are shown. The effects of the modules on the electrical supply system and the operational behavior of the power factor correction/harmonic filters are described. Included also are results of a power supply module feeding a superconducting magnet during quench propagation tests. Problems with the power supply design and solutions are presented. Some suggestions on how to improve the performance of these supplies are outlined.

  3. Reduced Toxicity Fuel Satellite Propulsion System

    NASA Technical Reports Server (NTRS)

    Schneider, Steven J. (Inventor)

    2001-01-01

    A reduced toxicity fuel satellite propulsion system including a reduced toxicity propellant supply for consumption in an axial class thruster and an ACS class thruster. The system includes suitable valves and conduits for supplying the reduced toxicity propellant to the ACS decomposing element of an ACS thruster. The ACS decomposing element is operative to decompose the reduced toxicity propellant into hot propulsive gases. In addition the system includes suitable valves and conduits for supplying the reduced toxicity propellant to an axial decomposing element of the axial thruster. The axial decomposing element is operative to decompose the reduced toxicity propellant into hot gases. The system further includes suitable valves and conduits for supplying a second propellant to a combustion chamber of the axial thruster, whereby the hot gases and the second propellant auto-ignite and begin the combustion process for producing thrust.

  4. Reduced Toxicity Fuel Satellite Propulsion System Including Plasmatron

    NASA Technical Reports Server (NTRS)

    Schneider, Steven J. (Inventor)

    2003-01-01

    A reduced toxicity fuel satellite propulsion system including a reduced toxicity propellant supply for consumption in an axial class thruster and an ACS class thruster. The system includes suitable valves and conduits for supplying the reduced toxicity propellant to the ACS decomposing element of an ACS thruster. The ACS decomposing element is operative to decompose the reduced toxicity propellant into hot propulsive gases. In addition the system includes suitable valves and conduits for supplying the reduced toxicity propellant to an axial decomposing element of the axial thruster. The axial decomposing element is operative to decompose the reduced toxicity propellant into hot gases. The system further includes suitable valves and conduits for supplying a second propellant to a combustion chamber of the axial thruster. whereby the hot gases and the second propellant auto-ignite and begin the combustion process for producing thrust.

  5. Joint FAM/Line Management Assessment Report on LLNL Machine Guarding Safety Program

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Armstrong, J. J.

    2016-07-19

    The LLNL Safety Program for Machine Guarding is implemented to comply with requirements in the ES&H Manual Document 11.2, "Hazards-General and Miscellaneous," Section 13 Machine Guarding (Rev 18, issued Dec. 15, 2015). The primary goal of this LLNL Safety Program is to ensure that LLNL operations involving machine guarding are managed so that workers, equipment and government property are adequately protected. This means that all such operations are planned and approved using the Integrated Safety Management System to provide the most cost effective and safest means available to support the LLNL mission.

  6. Meshes optimized for discrete exterior calculus (DEC).

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Mousley, Sarah C.; Deakin, Michael; Knupp, Patrick

    We study the optimization of an energy function used by the meshing community to measure and improve mesh quality. This energy is non-traditional because it is dependent on both the primal triangulation and its dual Voronoi (power) diagram. The energy is a measure of the mesh's quality for usage in Discrete Exterior Calculus (DEC), a method for numerically solving PDEs. In DEC, the PDE domain is triangulated and this mesh is used to obtain discrete approximations of the continuous operators in the PDE. The energy of a mesh gives an upper bound on the error of the discrete diagonal approximationmore » of the Hodge star operator. In practice, one begins with an initial mesh and then makes adjustments to produce a mesh of lower energy. However, we have discovered several shortcomings in directly optimizing this energy, e.g. its non-convexity, and we show that the search for an optimized mesh may lead to mesh inversion (malformed triangles). We propose a new energy function to address some of these issues.« less

  7. Inventory Management

    NASA Technical Reports Server (NTRS)

    1983-01-01

    Known as MRO for Maintenance, Repair and Operating supplies, Tropicana Products, Inc.'s automated inventory management system is an adaptation of the Shuttle Inventory Management System (SIMS) developed by NASA to assure adequate supply of every item used in support of the Space Shuttle. The Tropicana version monitors inventory control, purchasing receiving and departmental costs for eight major areas of the company's operation.

  8. Revamping AK-Ashland gas cleaning system

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Brandes, H.; Koerbel, R.; Haberkamp, K.

    1995-07-01

    AK Steel`s (formerly Armco) BOF shop was using a static precipitator for the primary collection. The system was designed for full combustion in the gas collecting hoods. No secondary dust collection was in place. A detailed study on alternative solutions led to a completely different system in 1990, and an order was awarded to Mannesmann Demag Corp. (MDC) in Dec. 1990. The new gas collection system is using suppressed combustion with the capability to collect Co at a later stage. The gas cleaning uses the Mannesmann Demag Baumco scrubber with a venturi throat for gas flow control. All auxiliary components,more » water treatment plant, electric substations and sludge handling were designed and supplied by MDC. The secondary dust collection covers the hot metal and scrap charging into the BOF`s, reladling, desulfurization and deslagging by a pulse jet baghouse. All emission limits set by the EPA and guaranteed by MDC have been met by the systems installed.« less

  9. SpaceX CRS-13 "What's on Board?" Mission Science Briefing

    NASA Image and Video Library

    2017-12-11

    Alessandro Grattoni, principal investigator at Houston Methodist Research Institute, left, and Yasaman Shirazi, mission scientist at NASA’s Ames Research Center in Mountain View, California, speak on an investigation testing drug delivery systems for combatting muscle breakdown in microgravity. The presentation was for members of social media gathered in the Kennedy Space Center’s Press Site auditorium. The briefing focused on research planned for launch to the International Space Station. The scientific materials and supplies will be aboard a Dragon spacecraft scheduled for liftoff from Cape Canaveral Air Force Station's Space Launch Complex 40 at 11:46 a.m. EST, on Dec. 12, 2017. The SpaceX Falcon 9 rocket will launch the company's 13th Commercial Resupply Services mission to the space station.

  10. Harnessing the Risk-Related Data Supply Chain: An Information Architecture Approach to Enriching Human System Research and Operations Knowledge

    NASA Technical Reports Server (NTRS)

    Buquo, Lynn E.; Johnson-Throop, Kathy A.

    2011-01-01

    An Information Architecture facilitates the understanding and, hence, harnessing of the human system risk-related data supply chain which enhances the ability to securely collect, integrate, and share data assets that improve human system research and operations. By mapping the risk-related data flow from raw data to useable information and knowledge (think of it as a data supply chain), the Human Research Program (HRP) and Space Life Science Directorate (SLSD) are building an information architecture plan to leverage their existing, and often shared, IT infrastructure.

  11. Cockrell and Rominger go through de-orbit preparations in the flight deck

    NASA Image and Video Library

    1996-12-06

    STS080-360-002 (19 Nov.-7 Dec. 1996) --- From the commander's station on the port side of the space shuttle Columbia's forward flight deck, astronaut Kenneth D. Cockrell prepares for a minor firing of Reaction Control System (RCS) engines during operations with the Wake Shield Facility (WSF). The activity was recorded with a 35mm camera on flight day seven. The commander is attired in a liquid-cooled biological garment.

  12. Network Centric Warfare Case Study: U.S. V Corps and 3rd Infantry Division (Mechanized) During Operation Iraqi Freedom Combat Operations (Mar-Apr 2003). Volume 3. Network Centric Warfare Insights

    DTIC Science & Technology

    2003-01-01

    OPSEC), military deception, psychological operations (PSYOPS), special information operations (IO), information assurance, physical security...nonlethal effects, such as operational 8 Network Centric Warfare Case Study security (OPSEC), military deception, psychological operations (PSYOP...Support Operations Group ASR Alternate Supply Route; or, Ammunition Supply Rate ATACMS Army Tactical Missile System ATARS Advanced

  13. 46 CFR 161.002-12 - Manual fire alarm systems.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    .... (a) General. A manual fire alarm system shall consist of a power supply, a control unit on which are... using manually operated fire alarm boxes. (3) Other types as may be developed. (c) Power supply. The power supply shall be as specified for automatic fire detecting system by § 161.002-9. (d) Manual fire...

  14. 46 CFR 161.002-12 - Manual fire alarm systems.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    .... (a) General. A manual fire alarm system shall consist of a power supply, a control unit on which are... using manually operated fire alarm boxes. (3) Other types as may be developed. (c) Power supply. The power supply shall be as specified for automatic fire detecting system by § 161.002-9. (d) Manual fire...

  15. KSC-2014-4854

    NASA Image and Video Library

    2014-12-18

    CAPE CANAVERAL, Fla. -- NASA's Orion spacecraft arrives at the Launch Abort System Facility at Kennedy Space Center in Florida. The spacecraft was transported 2,700 miles overland from Naval Base San Diego in California, on a flatbed truck secured in its crew module transportation fixture for the trip. During its first flight test, Orion completed a two-orbit, four-and-a-half hour mission Dec. 5 to test systems critical to crew safety, including the launch abort system, the heat shield and the parachute system. The Ground Systems Development and Operations Program led the recovery, offload and transportation efforts. For more information, visit www.nasa.gov/orion. Photo credit: NASA/Kim Shiflett

  16. KSC-2014-4856

    NASA Image and Video Library

    2014-12-18

    CAPE CANAVERAL, Fla. -- NASA's Orion spacecraft arrives inside the Launch Abort System Facility at Kennedy Space Center in Florida. The spacecraft was transported 2,700 miles overland from Naval Base San Diego in California, on a flatbed truck secured in its crew module transportation fixture for the trip. During its first flight test, Orion completed a two-orbit, four-and-a-half hour mission Dec. 5 to test systems critical to crew safety, including the launch abort system, the heat shield and the parachute system. The Ground Systems Development and Operations Program led the recovery, offload and transportation efforts. For more information, visit www.nasa.gov/orion. Photo credit: NASA/Kim Shiflett

  17. KSC-2014-4855

    NASA Image and Video Library

    2014-12-18

    CAPE CANAVERAL, Fla. -- NASA's Orion spacecraft arrives at the Launch Abort System Facility at Kennedy Space Center in Florida. The spacecraft was transported 2,700 miles overland from Naval Base San Diego in California, on a flatbed truck secured in its crew module transportation fixture for the trip. During its first flight test, Orion completed a two-orbit, four-and-a-half hour mission Dec. 5 to test systems critical to crew safety, including the launch abort system, the heat shield and the parachute system. The Ground Systems Development and Operations Program led the recovery, offload and transportation efforts. For more information, visit www.nasa.gov/orion. Photo credit: NASA/Kim Shiflett

  18. ISS Expedition 18 Sandra Magnus at Robotics Work Station (RWS)

    NASA Image and Video Library

    2008-12-05

    ISS018-E-010555 (5 Dec. 2008) --- Astronaut Sandra Magnus, Expedition 18 flight engineer, operates the Canadarm2 from the robotics work station in the Destiny laboratory of the International Space Station. Using the station's robotic arm, Magnus and astronaut Michael Fincke (out of frame), commander, relocated the ESP-3 from the Mobile Base System back to the Cargo Carrier Attachment System on the P3 truss. The ESP-3 spare parts platform was temporarily parked on the MBS to clear the path for the spacewalks during STS-126.

  19. KSC-2014-4878

    NASA Image and Video Library

    2014-12-19

    CAPE CANAVERAL, Fla. -- NASA's Orion spacecraft is viewed by members of the media at the Launch Abort System Facility at NASA's Kennedy Space Center in Florida. Orion made the 8-day, 2,700 mile overland trip back to Kennedy from Naval Base San Diego in California. Analysis of date obtained during its two-orbit, four-and-a-half hour mission Dec. 5 will provide engineers with detailed information on how the spacecraft fared. The Ground Systems Development and Operations Program led the recovery, offload and transportation efforts. For more information, visit www.nasa.gov/orion. Photo credit: NASA/Dimitri Gerondidakis

  20. KSC-2014-4876

    NASA Image and Video Library

    2014-12-19

    CAPE CANAVERAL, Fla. -- NASA's Orion spacecraft is viewed by members of the media at the Launch Abort System Facility at NASA's Kennedy Space Center in Florida. Orion made the 8-day, 2,700 mile overland trip back to Kennedy from Naval Base San Diego in California. Analysis of date obtained during its two-orbit, four-and-a-half hour mission Dec. 5 will provide engineers detailed information on how the spacecraft fared. The Ground Systems Development and Operations Program led the recovery, offload and transportation efforts. For more information, visit www.nasa.gov/orion. Photo credit: NASA/Dimitri Gerondidakis

  1. KSC-2014-4877

    NASA Image and Video Library

    2014-12-19

    CAPE CANAVERAL, Fla. -- NASA's Orion spacecraft is viewed by members of the media at the Launch Abort System Facility at NASA's Kennedy Space Center in Florida. Orion made the 8-day, 2,700 mile overland trip back to Kennedy from Naval Base San Diego in California. Analysis of date obtained during its two-orbit, four-and-a-half hour mission Dec. 5 will provide engineers with detailed information on how the spacecraft fared. The Ground Systems Development and Operations Program led the recovery, offload and transportation efforts. For more information, visit www.nasa.gov/orion. Photo credit: NASA/Dimitri Gerondidakis

  2. KSC-2014-4872

    NASA Image and Video Library

    2014-12-19

    CAPE CANAVERAL, Fla. -- NASA's Orion spacecraft is viewed by members of the media at the Launch Abort System Facility at NASA's Kennedy Space Center in Florida. Orion made the 8-day, 2,700 mile overland trip back to Kennedy from Naval Base San Diego in California. Analysis of date obtained during its two-orbit, four-and-a-half hour mission Dec. 5 will provide engineers detailed information on how the spacecraft fared. The Ground Systems Development and Operations Program led the recovery, offload and transportation efforts. For more information, visit www.nasa.gov/orion. Photo credit: NASA/Dimitri Gerondidakis

  3. ORION Media Event at LASF

    NASA Image and Video Library

    2014-12-19

    NASA's Orion spacecraft is viewed by members of the media at the Launch Abort System Facility at NASA's Kennedy Space Center in Florida. Kennedy News Chief Mike Curie speaks to the media during the viewing opportunity. Orion made the 8-day, 2,700 mile overland trip back to Kennedy from Naval Base San Diego in California. Analysis of data obtained during its two-orbit, four-and-a-half hour mission Dec. 5 will provide engineers detailed information on how the spacecraft fared. The Ground Systems Development and Operations Program led the recovery, offload and transportation efforts.

  4. ORION Media Event at LASF

    NASA Image and Video Library

    2014-12-19

    NASA's Orion spacecraft is viewed by members of the media at the Launch Abort System Facility at NASA's Kennedy Space Center in Florida. Kennedy News Chief Mike Curie speaks to the media during the viewing opportunity. Orion made the 8-day, 2,700 mile overland trip back to Kennedy from Naval Base San Diego in California. Analysis of date obtained during its two-orbit, four-and-a-half hour mission Dec. 5 will provide engineers with detailed information on how the spacecraft fared. The Ground Systems Development and Operations Program led the recovery, offload and transportation efforts.

  5. Safety aspects of whole-body cryochamber and cryosauna operation

    NASA Astrophysics Data System (ADS)

    Agnieszka, Piotrowska

    2017-12-01

    Interest in low temperature treatment is constantly increasing. Whole-body cryotherapy (WBC) devices are becoming available not only in medical centers but also in local gyms and spa centers. A new group of users are professional sport clubs where 3-minutes session of whole-body cryotherapy is post-training procedure to improve and speed up the recovery process. There are four different types of WBC devices available on the market and offered to commercial (non-medical) users. The American and European market is dominated by two of them: classic cryochambers and cryosaunas. Both constructions are supplied with liquid nitrogen. Low temperature inside classic cryochamber is produced by evaporating of liquid nitrogen in two or more heat exchangers. There is never a direct contact between user and cryogenic medium in any of system operation mode (closed supply system). Cryosauna is cooled down by filling with cold vapor of liquid nitrogen. Supply system is considered open because it allows for direct contact between user and cryogenic medium. Open supply system of cryosauna is primary and most questionable issue of its operational safety, particularly after tragic accident in October 2015. This paper presents the comparative analysis of classic cryochamber and cryosauna from safety point of view. Both devices have been analyzes and tested on existing systems in operation. Paper gives detailed analysis of constructions, supply systems and working parameters. Special attention has been focused to problem of oxygen deficiency hazard. Different failure or accident scenarios have been analyzed and discussed.

  6. NASA's Evolutionary Xenon Thruster (NEXT) Power Processing Unit (PPU) Capacitor Failure Root Cause Analysis

    NASA Technical Reports Server (NTRS)

    Soeder, James F.; Pinero, Luis; Schneidegger, Robert; Dunning, John; Birchenough, Art

    2012-01-01

    The NASA's Evolutionary Xenon Thruster (NEXT) project is developing an advanced ion propulsion system for future NASA missions for solar system exploration. A critical element of the propulsion system is the Power Processing Unit (PPU) which supplies regulated power to the key components of the thruster. The PPU contains six different power supplies including the beam, discharge, discharge heater, neutralizer, neutralizer heater, and accelerator supplies. The beam supply is the largest and processes up to 93+% of the power. The NEXT PPU had been operated for approximately 200+ hours and has experienced a series of three capacitor failures in the beam supply. The capacitors are in the same, nominally non-critical location the input filter capacitor to a full wave switching inverter. The three failures occurred after about 20, 30, and 135 hours of operation. This paper provides background on the NEXT PPU and the capacitor failures. It discusses the failure investigation approach, the beam supply power switching topology and its operating modes, capacitor characteristics and circuit testing. Finally, it identifies root cause of the failures to be the unusual confluence of circuit switching frequency, the physical layout of the power circuits, and the characteristics of the capacitor.

  7. NASA's Evolutionary Xenon Thruster (NEXT) Power Processing Unit (PPU) Capacitor Failure Root Cause Analysis

    NASA Technical Reports Server (NTRS)

    Soeder, James F.; Scheidegger, Robert J.; Pinero, Luis R.; Birchenough, Arthur J.; Dunning, John W.

    2012-01-01

    The NASA s Evolutionary Xenon Thruster (NEXT) project is developing an advanced ion propulsion system for future NASA missions for solar system exploration. A critical element of the propulsion system is the Power Processing Unit (PPU) which supplies regulated power to the key components of the thruster. The PPU contains six different power supplies including the beam, discharge, discharge heater, neutralizer, neutralizer heater, and accelerator supplies. The beam supply is the largest and processes up to 93+% of the power. The NEXT PPU had been operated for approximately 200+ hr and has experienced a series of three capacitor failures in the beam supply. The capacitors are in the same, nominally non-critical location-the input filter capacitor to a full wave switching inverter. The three failures occurred after about 20, 30, and 135 hr of operation. This paper provides background on the NEXT PPU and the capacitor failures. It discusses the failure investigation approach, the beam supply power switching topology and its operating modes, capacitor characteristics and circuit testing. Finally, it identifies root cause of the failures to be the unusual confluence of circuit switching frequency, the physical layout of the power circuits, and the characteristics of the capacitor.

  8. 41 CFR 101-25.101-4 - Supply through indefinite quantity requirement contracts.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    .... (3) The item is proprietary or so complex in design, function, or operation as to be noncompetitive... Federal Property Management Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS SUPPLY AND... introduced into a supply system), or no advantage accrues doing so; and (b) Industry distribution facilities...

  9. 41 CFR 101-25.101-4 - Supply through indefinite quantity requirement contracts.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    .... (3) The item is proprietary or so complex in design, function, or operation as to be noncompetitive... Federal Property Management Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS SUPPLY AND... introduced into a supply system), or no advantage accrues doing so; and (b) Industry distribution facilities...

  10. SHERLOCK: Simple Human Experiments Regarding Locally Observed Collective Knowledge

    DTIC Science & Technology

    2015-12-01

    ARL-RP-0560 ● DEC 2015 US Army Research Laboratory SHERLOCK: Simple Human Experiments Regarding Locally Observed Collective...report when it is no longer needed. Do not return it to the originator. ARL-RP-0560 ● DEC 2015 US Army Research Laboratory SHERLOCK... Research and Engineering Directorate, ARL Reprinted from the International Technology Alliance Collaboration System [accessed 2015 Dec 2]. https

  11. MODEL BASED BIOMASS SYSTEM DESIGN OF FEEDSTOCK SUPPLY SYSTEMS FOR BIOENERGY PRODUCTION

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    David J. Muth, Jr.; Jacob J. Jacobson; Kenneth M. Bryden

    Engineering feedstock supply systems that deliver affordable, high-quality biomass remains a challenge for the emerging bioenergy industry. Cellulosic biomass is geographically distributed and has diverse physical and chemical properties. Because of this feedstock supply systems that deliver cellulosic biomass resources to biorefineries require integration of a broad set of engineered unit operations. These unit operations include harvest and collection, storage, preprocessing, and transportation processes. Design decisions for each feedstock supply system unit operation impact the engineering design and performance of the other system elements. These interdependencies are further complicated by spatial and temporal variances such as climate conditions and biomassmore » characteristics. This paper develops an integrated model that couples a SQL-based data management engine and systems dynamics models to design and evaluate biomass feedstock supply systems. The integrated model, called the Biomass Logistics Model (BLM), includes a suite of databases that provide 1) engineering performance data for hundreds of equipment systems, 2) spatially explicit labor cost datasets, and 3) local tax and regulation data. The BLM analytic engine is built in the systems dynamics software package PowersimTM. The BLM is designed to work with thermochemical and biochemical based biofuel conversion platforms and accommodates a range of cellulosic biomass types (i.e., herbaceous residues, short- rotation woody and herbaceous energy crops, woody residues, algae, etc.). The BLM simulates the flow of biomass through the entire supply chain, tracking changes in feedstock characteristics (i.e., moisture content, dry matter, ash content, and dry bulk density) as influenced by the various operations in the supply chain. By accounting for all of the equipment that comes into contact with biomass from the point of harvest to the throat of the conversion facility and the change in characteristics, the BLM evaluates economic performance of the engineered system, as well as determining energy consumption and green house gas performance of the design. This paper presents a BLM case study delivering corn stover to produce cellulosic ethanol. The case study utilizes the BLM to model the performance of several feedstock supply system designs. The case study also explores the impact of temporal variations in climate conditions to test the sensitivity of the engineering designs. Results from the case study show that under certain conditions corn stover can be delivered to the cellulosic ethanol biorefinery for $35/dry ton.« less

  12. 42 CFR 84.142 - Air supply source; hand-operated or motor driven air blowers; Type A supplied-air respirators...

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... RESEARCH AND RELATED ACTIVITIES APPROVAL OF RESPIRATORY PROTECTIVE DEVICES Supplied-Air Respirators § 84... multiple systems, whereby more than one user is supplied by one blower, will be approved, unless each hose...

  13. 42 CFR 84.142 - Air supply source; hand-operated or motor driven air blowers; Type A supplied-air respirators...

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... RESEARCH AND RELATED ACTIVITIES APPROVAL OF RESPIRATORY PROTECTIVE DEVICES Supplied-Air Respirators § 84... multiple systems, whereby more than one user is supplied by one blower, will be approved, unless each hose...

  14. 42 CFR 84.142 - Air supply source; hand-operated or motor driven air blowers; Type A supplied-air respirators...

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... RESEARCH AND RELATED ACTIVITIES APPROVAL OF RESPIRATORY PROTECTIVE DEVICES Supplied-Air Respirators § 84... multiple systems, whereby more than one user is supplied by one blower, will be approved, unless each hose...

  15. 42 CFR 84.142 - Air supply source; hand-operated or motor driven air blowers; Type A supplied-air respirators...

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... RESEARCH AND RELATED ACTIVITIES APPROVAL OF RESPIRATORY PROTECTIVE DEVICES Supplied-Air Respirators § 84... multiple systems, whereby more than one user is supplied by one blower, will be approved, unless each hose...

  16. 42 CFR 84.142 - Air supply source; hand-operated or motor driven air blowers; Type A supplied-air respirators...

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... RESEARCH AND RELATED ACTIVITIES APPROVAL OF RESPIRATORY PROTECTIVE DEVICES Supplied-Air Respirators § 84... multiple systems, whereby more than one user is supplied by one blower, will be approved, unless each hose...

  17. 14 CFR 121.313 - Miscellaneous equipment.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... from its primary operating system to an alternate system, the means must include a positive positioning...) AIR CARRIERS AND OPERATORS FOR COMPENSATION OR HIRE: CERTIFICATION AND OPERATIONS OPERATING... equivalent for each pilot station. (c) A power supply and distribution system that meets the requirements of...

  18. 14 CFR 121.313 - Miscellaneous equipment.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... from its primary operating system to an alternate system, the means must include a positive positioning...) AIR CARRIERS AND OPERATORS FOR COMPENSATION OR HIRE: CERTIFICATION AND OPERATIONS OPERATING... equivalent for each pilot station. (c) A power supply and distribution system that meets the requirements of...

  19. The value of supply chain coordination under moral hazard: A case study of the consumer product supply chain

    PubMed Central

    Lee, Yumi; Song, Sang Hwa

    2018-01-01

    In this paper, we examine a real-world case related to the consumer product supply chain to analyze the value of supply chain coordination under the condition of moral hazard. Because of the characteristics of a buyback contract scheme employed in the supply chain, the supplier company’s sales department encourages retailers to order more inventory to meet their sales target, whereas retailers pay less attention to their inventory level and leftovers at the end of the season. This condition induces moral hazard problems in the operation of the supply chain, as suppliers suffer from huge returns of leftover inventory. This, in turn, is related to the obsolescence of returned inventory, even with penalty terms in the contract for the return of any leftovers. In this study, we show under the current buyback-based supply chain operation, the inventory levels of both the supplier and retailers exceed customer demand and develop vendor-managed inventory (VMI) system with base stock policy to remove any mismatch of supply and demand. A comparison of both systems shows that through the proper coordination of supply chain operations, both suppliers and retailers can gain additional benefits while providing proper services to end customers. PMID:29547625

  20. Reduced Toxicity Fuel Satellite Propulsion System Including Fuel Cell Reformer with Alcohols Such as Methanol

    NASA Technical Reports Server (NTRS)

    Schneider, Steven J. (Inventor)

    2001-01-01

    A reduced toxicity fuel satellite propulsion system including a reduced toxicity propellant supply for consumption in an axial class thruster and an ACS class thruster. The system includes suitable valves and conduits for supplying the reduced toxicity propellant to the ACS decomposing element of an ACS thruster. The ACS decomposing element is operative to decompose the reduced toxicity propellant into hot propulsive gases. In addition the system includes suitable valves and conduits for supplying the reduced toxicity propellant to an axial decomposing element of the axial thruster. The axial decomposing element is operative to decompose the reduced toxicity propellant into hot gases. The system further includes suitable valves and conduits for supplying a second propellant to a combustion chamber of the axial thruster, whereby the hot gases and the second propellant auto-ignite and begin the combustion process for producing thrust.

  1. Orion Returns to KSC after Successful Mission

    NASA Image and Video Library

    2014-12-18

    NASA's Orion crew module, enclosed in its crew module transportation fixture and secured on a flatbed truck passes by the Space Shuttle Atlantis building at the Kennedy Space Center Visitor Complex on its way to the entrance gate to Kennedy Space Center in Florida. Orion made the overland trip from Naval Base San Diego in California. Orion was recovered from the Pacific Ocean after completing a two-orbit, four-and-a-half hour mission Dec. 5 to test systems critical to crew safety, including the launch abort system, the heat shield and the parachute system. The Ground Systems Development and Operations Program led the recovery, offload and transportation efforts.

  2. KSC-2014-4834

    NASA Image and Video Library

    2014-12-18

    CAPE CANAVERAL, Fla. -- NASA's Orion crew module, enclosed in its crew module transportation fixture and secured on a flatbed truck nears the entrance gate to Kennedy Space Center in Florida. Orion made the 2,700 mile overland trip from Naval Base San Diego in California. Orion was recovered from the Pacific Ocean after completing a two-orbit, four-and-a-half hour mission Dec. 5 to test systems critical to crew safety, including the launch abort system, the heat shield and the parachute system. The Ground Systems Development and Operations Program led the recovery, offload and transportation efforts. For more information, visit www.nasa.gov/orion. Photo credit: NASA/Dimitri Gerondidakis

  3. 250 kV 6 mA compact Cockcroft-Walton high-voltage power supply.

    PubMed

    Ma, Zhan-Wen; Su, Xiao-Dong; Lu, Xiao-Long; Wei, Zhen; Wang, Jun-Run; Huang, Zhi-Wu; Miao, Tian-You; Su, Tong-Ling; Yao, Ze-En

    2016-08-01

    A compact power supply system for a compact neutron generator has been developed. A 4-stage symmetrical Cockcroft-Walton circuit is adopted to produce 250 kV direct current high-voltage. A 2-stage 280 kV isolation transformer system is used to drive the ion source power supply. For a compact structure, safety, and reliability during the operation, the Cockcroft-Walton circuit and the isolation transformer system are enclosed in an epoxy vessel containing the transformer oil whose size is about ∅350 mm × 766 mm. Test results indicate that the maximum output voltage of the power supply is 282 kV, and the stability of the output voltage is better than 0.63% when the high voltage power supply is operated at 250 kV, 6.9 mA with the input voltage varying ±10%.

  4. 250 kV 6 mA compact Cockcroft-Walton high-voltage power supply

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ma, Zhan-Wen; Su, Xiao-Dong; Wei, Zhen

    A compact power supply system for a compact neutron generator has been developed. A 4-stage symmetrical Cockcroft-Walton circuit is adopted to produce 250 kV direct current high-voltage. A 2-stage 280 kV isolation transformer system is used to drive the ion source power supply. For a compact structure, safety, and reliability during the operation, the Cockcroft-Walton circuit and the isolation transformer system are enclosed in an epoxy vessel containing the transformer oil whose size is about ∅350 mm × 766 mm. Test results indicate that the maximum output voltage of the power supply is 282 kV, and the stability of themore » output voltage is better than 0.63% when the high voltage power supply is operated at 250 kV, 6.9 mA with the input voltage varying ±10%.« less

  5. CARE3MENU- A CARE III USER FRIENDLY INTERFACE

    NASA Technical Reports Server (NTRS)

    Pierce, J. L.

    1994-01-01

    CARE3MENU generates an input file for the CARE III program. CARE III is used for reliability prediction of complex, redundant, fault-tolerant systems including digital computers, aircraft, nuclear and chemical control systems. The CARE III input file often becomes complicated and is not easily formatted with a text editor. CARE3MENU provides an easy, interactive method of creating an input file by automatically formatting a set of user-supplied inputs for the CARE III system. CARE3MENU provides detailed on-line help for most of its screen formats. The reliability model input process is divided into sections using menu-driven screen displays. Each stage, or set of identical modules comprising the model, must be identified and described in terms of number of modules, minimum number of modules for stage operation, and critical fault threshold. The fault handling and fault occurence models are detailed in several screens by parameters such as transition rates, propagation and detection densities, Weibull or exponential characteristics, and model accuracy. The system fault tree and critical pairs fault tree screens are used to define the governing logic and to identify modules affected by component failures. Additional CARE3MENU screens prompt the user for output options and run time control values such as mission time and truncation values. There are fourteen major screens, many with default values and HELP options. The documentation includes: 1) a users guide with several examples of CARE III models, the dialog required to input them to CARE3MENU, and the output files created; and 2) a maintenance manual for assistance in changing the HELP files and modifying any of the menu formats or contents. CARE3MENU is written in FORTRAN 77 for interactive execution and has been implemented on a DEC VAX series computer operating under VMS. This program was developed in 1985.

  6. Probability and Conditional Probability of Cumulative Cloud Cover for Selected Stations Worldwide.

    DTIC Science & Technology

    1985-07-01

    INTRODUCTION The performance of precision-guided munition (PGM) systems may be severely compromised by the presence of clouds in the desired target...Korea 37.98 N 12794 E Mar 67-Dec 79 4Ku san, Korea 37.90 N 126.63 E Jaug 51-Dec 81 (No Jan 71-Dec 72) 4 -7141- Taegu & Tonchon, Korea 35.90 N 128.67 E Jan

  7. Building 865 Hypersonic Wind Tunnel Power System Analysis

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Schneider, Larry X.

    2015-02-01

    This report documents the characterization and analysis of a high current power supply for the building 865 Hypersonic Wind Tunnel at Sandia National Laboratories. The system described in this report became operational in 2013, replacing the original 1968 system which employed an induction voltage regulator. This analysis and testing was completed to help the parent organization understand why an updated and redesigned power system was not delivering adequate power to resistive heater elements in the HWT. This analysis led to an improved understanding of the design and operation of the revised 2013 power supply system and identifies several reasons themore » revised system failed to achieve the performance of the original power supply installation. Design modifications to improve the performance of this system are discussed.« less

  8. Extending the Capabilities of Closed-loop Distributed Engine Control Simulations Using LAN Communication

    NASA Technical Reports Server (NTRS)

    Aretskin-Hariton, Eliot D.; Zinnecker, Alicia Mae; Culley, Dennis E.

    2014-01-01

    Distributed Engine Control (DEC) is an enabling technology that has the potential to advance the state-of-the-art in gas turbine engine control. To analyze the capabilities that DEC offers, a Hardware-In-the-Loop (HIL) test bed is being developed at NASA Glenn Research Center. This test bed will support a systems-level analysis of control capabilities in closed-loop engine simulations. The structure of the HIL emulates a virtual test cell by implementing the operator functions, control system, and engine on three separate computers. This implementation increases the flexibility and extensibility of the HIL. Here, a method is discussed for implementing these interfaces by connecting the three platforms over a dedicated Local Area Network (LAN). This approach is verified using the Commercial Modular Aero-Propulsion System Simulation 40k (C-MAPSS40k), which is typically implemented on one computer. There are marginal differences between the results from simulation of the typical and the three-computer implementation. Additional analysis of the LAN network, including characterization of network load, packet drop, and latency, is presented. The three-computer setup supports the incorporation of complex control models and proprietary engine models into the HIL framework.

  9. The molecular gradient using the divide-expand-consolidate resolution of the identity second-order Møller-Plesset perturbation theory: The DEC-RI-MP2 gradient

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bykov, Dmytro; Kristensen, Kasper; Kjærgaard, Thomas

    We report an implementation of the molecular gradient using the divide-expand-consolidate resolution of the identity second-order Møller-Plesset perturbation theory (DEC-RI-MP2). The new DEC-RI-MP2 gradient method combines the precision control as well as the linear-scaling and massively parallel features of the DEC scheme with efficient evaluations of the gradient contributions using the RI approximation. We further demonstrate that the DEC-RI-MP2 gradient method is capable of calculating molecular gradients for very large molecular systems. A test set of supramolecular complexes containing up to 158 atoms and 1960 contracted basis functions has been employed to demonstrate the general applicability of the DEC-RI-MP2 methodmore » and to analyze the errors of the DEC approximation. Moreover, the test set contains molecules of complicated electronic structures and is thus deliberately chosen to stress test the DEC-RI-MP2 gradient implementation. Additionally, as a showcase example the full molecular gradient for insulin (787 atoms and 7604 contracted basis functions) has been evaluated.« less

  10. Australian experience with frozen blood products on military operations.

    PubMed

    Neuhaus, Susan J; Wishaw, Ken; Lelkens, Charles

    2010-02-15

    Historically, the Australian Defence Force (ADF) has sourced all its blood supplies from the Australian Red Cross Blood Service. Recent ADF operations in the Middle East have highlighted a need to rely on other nations' blood supply systems. In 2008, the ADF embedded a surgical and intensive care team into the Netherlands-led forward health facility at the Uruzgan Medical Centre at Tarin Kowt in Afghanistan. To date, three teams have provided 2-month rotations as part of the North Atlantic Treaty Organization International Security Assistance Force in Afghanistan. The Netherlands armed forces use a sophisticated system for supply of liquid and frozen blood products (frozen red cells, plasma and platelets). We review Australian experience with the Dutch system of supplying blood products for major trauma resuscitation in Afghanistan.

  11. Electrical safety during transplantation.

    PubMed

    Amicucci, G L; Di Lollo, L; Fiamingo, F; Mazzocchi, V; Platania, G; Ranieri, D; Razzano, R; Camin, G; Sebastiani, G; Gentile, P

    2010-01-01

    Technologic innovations enable management of medical equipment and power supply systems, with improvements that can affect the technical aspects, economics, and quality of medical service. Herein are outlined some technical guidelines, proposed by Istituto Superiore per la Prevenzione e la Sicurezza del Lavoro, for increasing the effectiveness of the power supply system and the safety of patients and surgeons in the operating room, with particular focus on transplantation. The dependence of diagnoses and therapies on operation of the electrical equipment can potentially cause great risk to patients. Moreover, it is possible that faulty electrical equipment could produce current that may flow through the patient. Because patients are particularly vulnerable when their natural protection is considerably decreased, as during transplantation or other surgery, power supply systems must operate with a high degree of reliability and quality to prevent risk, and must be designed to reduce hazards from direct and indirect contact. Reliability of the power supply system is closely related to the quality of the project, choice of materials, and management of the system (eg, quality and frequency of servicing). Among the proposed guidelines, other than normal referencing, are (1) adoption of a monitoring system to improve the quality of the electrical parameters in the operating room, (2) institution of emergency procedures for management of electrical faults, (3) a procedure for management of fires in the operating room, (4) and maintenance interventions and inspections of medical devices to maintain minimal requirements of safety and performance. Copyright 2010 Elsevier Inc. All rights reserved.

  12. The Effect of Power Protection Equipment on Explosion Hazards and on the Reliability of Power Supply to Longwall Systems

    NASA Astrophysics Data System (ADS)

    Boron, Sergiusz

    2017-06-01

    Operational safety of electrical machines and equipment depends, inter alia, on the hazards resulting from their use and on the scope of applied protective measures. The use of insufficient protection against existing hazards leads to reduced operational safety, particularly under fault conditions. On the other hand, excessive (in relation to existing hazards) level of protection may compromise the reliability of power supply. This paper analyses the explosion hazard created by earth faults in longwall power supply systems and evaluates existing protection equipment from the viewpoint of its protective performance, particularly in the context of explosion hazards, and also assesses its effect on the reliability of power supply.

  13. Supply chain management in the clinical laboratory.

    PubMed

    McHugh, Thomas M

    2006-01-31

    Between 15 and 45 percent of a clinical laboratory's operating budget is spent on supplies. Given the size of this expenditure, laboratory managers must pay close attention to the supply chain and develop effective strategies to manage their inventory. Areas that need analysis include the carrying cost of supplies, the cost to generate a purchase order, methods to efficiently count supplies on hand, processes to ensure that lot number items are used before their expiration, and detailed analysis of the inventory. At the University of California-San Francisco Medical Center, we investigated options to manage our inventory and implemented a computerized system. The system required modifications to existing practices, which initially seemed unwieldy. However, after a relatively short learning curve, the improvement to operations has been significant, with a reduction in wasted reagents, fewer staff hours used to count supplies, and the ability to provide prompt analysis of the inventory for audits and discussions with administration. Focusing on the supply chain has allowed us to reduce inventory expenses by approximately 8 percent, reduce waste, given us a more focused understanding of our operations, and provided us with the ability to analyze our inventory easily.

  14. 49 CFR 236.516 - Power supply.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 4 2011-10-01 2011-10-01 false Power supply. 236.516 Section 236.516..., Train Control and Cab Signal Systems Standards § 236.516 Power supply. Automatic cab signal, train stop, or train control device hereafter installed shall operate from a separate or isolated power supply...

  15. 49 CFR 236.516 - Power supply.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 4 2010-10-01 2010-10-01 false Power supply. 236.516 Section 236.516..., Train Control and Cab Signal Systems Standards § 236.516 Power supply. Automatic cab signal, train stop, or train control device hereafter installed shall operate from a separate or isolated power supply...

  16. KSC-07pd3633

    NASA Image and Video Library

    2007-12-14

    KENNEDY SPACE CENTER, FLA. -- Space shuttle Atlantis' external tank and solid rocket boosters will be the subject of a tanking test with the Time Domain Reflectometry, or TDR, test equipment whose wiring is being calibrated Dec. 14. The shuttle's planned launches on Dec. 6 and Dec. 9 were postponed because of false readings from the part of the ECO system that monitors the liquid hydrogen section of the tank. The liftoff date from NASA's Kennedy Space Center, Florida, is now targeted for Jan. 10, depending on the resolution of the problem in the fuel sensor system. Photo credit: NASA/Kim Shiflett

  17. Ultramar Refining, Subsidiary of Valero Energy Corporation, Wilmington, California; Dec. 12, 2008, Petition to Object to Title V Operating Permit

    EPA Pesticide Factsheets

    This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Petition Database available at www2.epa.gov/title-v-operating-permits/title-v-petition-database.

  18. Analysis of dynamic requirements for fuel cell systems for vehicle applications

    NASA Astrophysics Data System (ADS)

    Pischinger, Stefan; Schönfelder, Carsten; Ogrzewalla, Jürgen

    Conventional vehicles with internal combustion engines, as well as battery powered electric vehicles, achieve one of the most important customer requirements; achieving extremely short response times to load changes. Also, fast acceleration times from a cold start to full power in the range of seconds are practicable. New fuel cell-based propulsion systems, as well as auxiliary power units, have to fulfill the same demands to become competitive. This includes heating-up the system to operating temperature as well as the control strategy for start-up. An additional device to supply starting air is necessary, if the compressor motor can only be operated with fuel cell voltage. Since the system components (for example, the air supply or the fuel supply) are not mechanically coupled, as is the case with conventional internal combustion engines, these components have to be controlled by different sensors and actuators. This can be an advantage in optimizing the system, but it also can represent an additional challenge. This paper describes the fuel cell system requirements regarding transient operation and their dependence on system structure. In particular, the requirements for peripheral components such as air supply, fuel supply and the balance of heat in a fuel cell system are examined. Furthermore, the paper outlines the necessity of an electric storage device and its resultant capacity, which will enable faster load changes. Acceleration and deceleration of the vehicle are accomplished through the use of the electric storage device, while the fuel cell system only has to deliver the mean power consumption without higher load peaks. On the basis of system simulation, different concepts are evaluated for use as a propulsion system or APU and, then, critical components are identified. The effects of advanced control strategies regarding the dynamic behavior of the system are demonstrated. Technically, a fuel cell system could be a viable propulsion system alternative to conventional combustion engines, as long as there is a sufficient amount of power output from the fuel cell available for low operating temperatures. An optimized air supply system meets the requirements for transient operation in vehicles; however, specially designed machines are necessary-in particular smaller, integrated units. The electrical storage device helps to minimize fuel cell system response times for transient operation. An even more important point is that the fuel cell can be downsized. Utilizing this potential can reduce cost, space and weight. Fuel processing is preferable for auxiliary power units, since they have to operate in vehicles that use either gasoline or diesel fuel. High losses during the start-up phase can be avoided by using a battery to buffer the highly fluctuating power demands. Only advanced control methods are acceptable for controlling the operation of a fuel cell system with several components. Fuel cell systems can be developed and precisely optimized through the use of simulation tools, within an accelerated development process.

  19. Differentiated embryonic chondrocytes 1 expression of periodontal ligament tissue and gingival tissue in the patients with chronic periodontitis.

    PubMed

    Hu, Shenlin; Shang, Wei; Yue, Haitao; Chen, Ruini; Dong, Zheng; Hu, Jinhua; Mao, Zhao; Yang, Jian

    2015-04-01

    To evaluate the DEC1 expression of periodontal ligament tissue and gingival tissue in the patients with chronic periodontitis. 20 non-smoking patients with chronic periodontitis and 20 healthy individuals were enrolled. Periodontal ligament tissue and gingival tissue samples from healthy subjects were collected during teeth extraction for orthodontic reason or the third molar extraction. The parallel samples from patients with chronic periodontitis were obtained during periodontal flap operations or teeth extraction as part of periodontal treatment. The DEC1 expression and the alkaline phosphatase (ALP) activity of both the periodontal ligament tissue and gingival tissue were determined by Western blot, Immunohistochemistry and ALP Detection Kit. The DEC1 expression of periodontal ligament tissue in the patients with chronic periodontitis decreased significantly along with the decreased ALP activity. On the contrary, the DEC1 expression of gingival tissue in the patients with chronic periodontitis increased significantly. Further study found that the DEC1 expression of gingival tissue increased mainly in the suprabasal layer of gingival epithelial cells but decreased in the gingival connective tissue of the patients with chronic periodontitis. The DEC1 expression decreases in the periodontal ligament tissue which is related to the osteogenic capacity, whereas the DEC1 expression increases in the suprabasal layer of gingival epithelial cells which are involved in immune inflammatory response in the patients with chronic periodontitis. The findings provide a new target to explore the pathology and the therapy of periodontitis. Copyright © 2014 Elsevier Ltd. All rights reserved.

  20. Real-time operating system for selected Intel processors

    NASA Technical Reports Server (NTRS)

    Pool, W. R.

    1980-01-01

    The rationale for system development is given along with reasons for not using vendor supplied operating systems. Although many system design and performance goals were dictated by problems with vendor supplied systems, other goals surfaced as a result of a design for a custom system able to span multiple projects. System development and management problems and areas that required redesign or major code changes for system implementation are examined as well as the relative successes of the initial projects. A generic description of the actual project is provided and the ongoing support requirements and future plans are discussed.

  1. Confirmatory/release survey of the property at 71 Pearce Avenue (Former EAD Building) in Tonawanda, New York

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Salame-Alfie, A.; Alibozek, R.

    1995-12-31

    EAD Metallurgical, Inc., operated a facility in Tonawanda, New York, in which it utilized Americium 241 (Am-241) for the production of foil sources for use in smoke detectors. EAD was in operation between 1977 and 1983. By 1983, the company started losing money, and decided to relocate to Mexico. Before closing down its Tonawanda operation, however, it was required by the New York State Department of Labor (DOL) to decontaminate its facility to limits specified by DOL. No records of discharges to the sewer system were kept during this decontamination effort. Unsuccessful decontamination efforts by several EAD employees and contractorsmore » left the building contaminated, in particular the concrete floors and walls. To determine the scope of work for the decontamination project, staff from the New York State Departments of Health (DOH) and Environmental Conservation (DEC) conducted a Characterization Survey of the facility in 1993. This survey identified contamination levels of Am-241 in excess of release limits throughout the building, in the soil outside the facility, in pipes for sewage and interior drainage, and in an 8 x 8 x 11 foot sump pit in the building. DOH issued a request for proposals in early 1994 for the decontamination and subsequent decommissioning of the former EAD building, and NES/IES Inc. (NES) was awarded the contract to perform the remediation. DOH`s assignment was to provide an on-site presence to insure the completion of all agreed upon tasks, according to the terms of the contract and work plans submitted by NES. Additionally, the DOH staff acted as a liaison between NES, DOH, DEC and DOL central offices to review, comment and approve all changes or modifications to NES`s approach to the decontamination efforts. The assigned staff was also responsible for conducting confirmatory sampling and surveys of all areas deemed releasable to DOL and DEC criteria by NES.« less

  2. A real time status monitor for transistor bank driver power limit resistor in boost injection kicker power supply

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Mi, J.; Tan, Y.; Zhang, W.

    2011-03-28

    For years suffering of Booster Injection Kicker transistor bank driver regulator troubleshooting, a new real time monitor system has been developed. A simple and floating circuit has been designed and tested. This circuit monitor system can monitor the driver regulator power limit resistor status in real time and warn machine operator if the power limit resistor changes values. This paper will mainly introduce the power supply and the new designed monitoring system. This real time resistor monitor circuit shows a useful method to monitor some critical parts in the booster pulse power supply. After two years accelerator operation, it showsmore » that this monitor works well. Previously, we spent a lot of time in booster machine trouble shooting. We will reinstall all 4 PCB into Euro Card Standard Chassis when the power supply system will be updated.« less

  3. 76 FR 39072 - Notice of Availability of a Final Environmental Impact Statement and Final Habitat Conservation Plan

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-05

    ... listed and six unlisted species of fish covered by Kent's Clark Springs Water Supply HCP. This notice... applications are for the operation and maintenance of Kent's Clark Springs Water Supply System adjacent to Rock Creek, King County, Washington. The Clark Springs Water Supply System consists of a spring-fed...

  4. Development of the Optimum Operation Scheduling Model of Domestic Electric Appliances for the Supply-Demand Adjustment in a Power System

    NASA Astrophysics Data System (ADS)

    Ikegami, Takashi; Iwafune, Yumiko; Ogimoto, Kazuhiko

    The high penetration of variable renewable generation such as Photovoltaic (PV) systems will cause the issue of supply-demand imbalance in a whole power system. The activation of the residential power usage, storage and generation by sophisticated scheduling and control using the Home Energy Management System (HEMS) will be needed to balance power supply and demand in the near future. In order to evaluate the applicability of the HEMS as a distributed controller for local and system-wide supply-demand balances, we developed an optimum operation scheduling model of domestic electric appliances using the mixed integer linear programming. Applying this model to several houses with dynamic electricity prices reflecting the power balance of the total power system, it was found that the adequate changes in electricity prices bring about the shift of residential power usages to control the amount of the reverse power flow due to excess PV generation.

  5. Aero/fluids database system

    NASA Technical Reports Server (NTRS)

    Reardon, John E.; Violett, Duane L., Jr.

    1991-01-01

    The AFAS Database System was developed to provide the basic structure of a comprehensive database system for the Marshall Space Flight Center (MSFC) Structures and Dynamics Laboratory Aerophysics Division. The system is intended to handle all of the Aerophysics Division Test Facilities as well as data from other sources. The system was written for the DEC VAX family of computers in FORTRAN-77 and utilizes the VMS indexed file system and screen management routines. Various aspects of the system are covered, including a description of the user interface, lists of all code structure elements, descriptions of the file structures, a description of the security system operation, a detailed description of the data retrieval tasks, a description of the session log, and a description of the archival system.

  6. The New York City Operations Support Tool: Supporting Water Supply Operations for Millions in an Era of Changing Patterns in Hydrological Extreme Events

    NASA Astrophysics Data System (ADS)

    Matonse, A. H.; Porter, J. H.; Frei, A.

    2015-12-01

    Providing an average 1.1 billion gallons (~ 4.2 x 106 cubic meters) of drinking water per day to approximately nine million people in New York City (NYC) and four upstate counties, the NYC water supply is among the world's largest unfiltered systems. In addition to providing a reliable water supply in terms of water quantity and quality, the city has to fulfill other flow objectives to serve downstream communities. At times, such as during extreme hydrological events, water quality issues may restrict water usage for parts of the system. To support a risk-based water supply decision making process NYC has developed the Operations Support Tool (OST). OST combines a water supply systems model with reservoir water quality models, near real time data ingestion, data base management and an ensemble hydrological forecast. A number of reports have addressed the frequency and intensities of extreme hydrological events across the continental US. In the northeastern US studies have indicated an increase in the frequency of extremely large precipitation and streamflow events during the most recent decades. During this presentation we describe OST and, using case studies we demonstrate how this tool has been useful to support operational decisions. We also want to motivate a discussion about how undergoing changes in patterns of hydrological extreme events elevate the challenge faced by water supply managers and the role of the scientific community to integrate nonstationarity approaches in hydrologic forecast and modeling.

  7. Expression of Chicken DEC205 Reflects the Unique Structure and Function of the Avian Immune System

    PubMed Central

    Staines, Karen; Young, John R.; Butter, Colin

    2013-01-01

    The generation of appropriate adaptive immune responses relies critically on dendritic cells, about which relatively little is known in chickens, a vital livestock species, in comparison with man and mouse. We cloned and sequenced chicken DEC205 cDNA and used this knowledge to produce quantitative PCR assays and monoclonal antibodies to study expression of DEC205 as well as CD83. The gene structure of DEC205 was identical to those of other species. Transcripts of both genes were found at higher levels in lymphoid tissues and the expression of DEC205 in normal birds had a characteristic distribution in the primary lymphoid organs. In spleen, DEC205 was seen on cells ideally located to trap antigen. In thymus it was found on cells thought to participate in the education of T cells, and in the bursa on cells that may be involved in presentation of antigen to B cells and regulation of B cell migration. The expression of DEC205 on cells other than antigen presenting cells (APC) is also described. Isolated splenocytes strongly expressing DEC205 but not the KUL01 antigen have morphology similar to mammalian dendritic cells and the distinct expression of DEC205 within the avian-specific Bursa of Fabricius alludes to a unique function in this organ of B cell diversification. PMID:23326318

  8. STS-108 Pilot Kelly suits up for launch

    NASA Technical Reports Server (NTRS)

    2001-01-01

    STS-108 Pilot Kelly suits up for launch KSC-01PD-1776 KENNEDY SPACE CENTER, Fla. -- STs-108 Pilot Mark E. Kelly is helped with his launch and entry suit in preparation for the second launch attempt of Space Shuttle Endeavour. The first attempt Dec. 4 was scrubbed due to poor weather conditions at KSC. The main goals of the mission are to carry the Expedition 4 crew to the International Space Station as replacement for Expedition 3; carry the Multi-Purpose Logistics Module Raffaello filled with water, equipment and supplies; and install thermal blankets over equipment at the base of the ISS solar wings. STS-108 is the final Shuttle mission of 2001 and the 107th Shuttle flight overall. It is the 12th flight to the Space Station. Launch is scheduled for 5:19 p.m. EST Dec. 5, 2001, from Launch Pad 39B.

  9. Chapter 16 - Predictive Analytics for Comprehensive Energy Systems State Estimation

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Zhang, Yingchen; Yang, Rui; Hodge, Brian S

    Energy sustainability is a subject of concern to many nations in the modern world. It is critical for electric power systems to diversify energy supply to include systems with different physical characteristics, such as wind energy, solar energy, electrochemical energy storage, thermal storage, bio-energy systems, geothermal, and ocean energy. Each system has its own range of control variables and targets. To be able to operate such a complex energy system, big-data analytics become critical to achieve the goal of predicting energy supplies and consumption patterns, assessing system operation conditions, and estimating system states - all providing situational awareness to powermore » system operators. This chapter presents data analytics and machine learning-based approaches to enable predictive situational awareness of the power systems.« less

  10. X-45A in flight with F-18 #846 chase aircraft, during first GPS-guided weapon demonstration flight

    NASA Image and Video Library

    2002-12-19

    The first X-45A Unmanned Combat Air Vehicle (UCAV) technology demonstrator completed its sixth flight on Dec. 19, 2002, raising its landing gear in flight for the first time. The X-45A flew for 40 minutes and reached an airspeed of 195 knots and an altitude of 7,500 feet. Dryden is supporting the DARPA/Boeing team in the design, development, integration, and demonstration of the critical technologies, processes, and system attributes leading to an operational UCAV system. Dryden support of the X-45A demonstrator system includes analysis, component development, simulations, ground and flight tests.

  11. 46 CFR 111.97-7 - Distribution.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... REQUIREMENTS Electric Power-Operated Watertight Door Systems § 111.97-7 Distribution. (a) Each distribution... locking. (b) Each feeder supplying a watertight door operating system must be above the uppermost continuous deck. (c) Each watertight door operating system must have a separate branch circuit. ...

  12. 46 CFR 111.97-7 - Distribution.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... REQUIREMENTS Electric Power-Operated Watertight Door Systems § 111.97-7 Distribution. (a) Each distribution... locking. (b) Each feeder supplying a watertight door operating system must be above the uppermost continuous deck. (c) Each watertight door operating system must have a separate branch circuit. ...

  13. 46 CFR 111.97-7 - Distribution.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... REQUIREMENTS Electric Power-Operated Watertight Door Systems § 111.97-7 Distribution. (a) Each distribution... locking. (b) Each feeder supplying a watertight door operating system must be above the uppermost continuous deck. (c) Each watertight door operating system must have a separate branch circuit. ...

  14. 46 CFR 111.97-7 - Distribution.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... REQUIREMENTS Electric Power-Operated Watertight Door Systems § 111.97-7 Distribution. (a) Each distribution... locking. (b) Each feeder supplying a watertight door operating system must be above the uppermost continuous deck. (c) Each watertight door operating system must have a separate branch circuit. ...

  15. 46 CFR 111.97-7 - Distribution.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... REQUIREMENTS Electric Power-Operated Watertight Door Systems § 111.97-7 Distribution. (a) Each distribution... locking. (b) Each feeder supplying a watertight door operating system must be above the uppermost continuous deck. (c) Each watertight door operating system must have a separate branch circuit. ...

  16. Friendly Neighborhood Computer Project. Extension of the IBM NJE network to DEC VAX computers

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Raffenetti, R.C.; Bertoncini, P.J.; Engert, D.E.

    1984-07-01

    This manual is divided into six chapters. The first is an overview of the VAX NJE emulator system and describes what can be done with the VAX NJE emulator software. The second chapter describes the commands that users of the VAX systems will use. Each command description includes the format of the command, a list of valid options and parameters and their meanings, and several short examples of command use. The third chapter describes the commands and capabilities for sending general, sequential files from and to VAX VMS nodes. The fourth chapter describes how to transmit data to a VAXmore » from other computer systems on the network. The fifth chapter explains how to exchange electronic mail with IBM CMS users and with users of other VAX VMS systems connected by NJE communications. The sixth chapter describes operator procedures and the additional commands operators may use.« less

  17. Business and continuity of operations: care of the critically ill and injured during pandemics and disasters: CHEST consensus statement.

    PubMed

    Tosh, Pritish K; Feldman, Henry; Christian, Michael D; Devereaux, Asha V; Kissoon, Niranjan; Dichter, Jeffrey R

    2014-10-01

    During disasters, supply chain vulnerabilities, such as power, transportation, and communication, may affect the delivery of medications and medical supplies and hamper the ability to deliver critical care services. Disasters also have the potential to disrupt information technology (IT) in health-care systems, resulting in interruptions in patient care, particularly critical care, and other health-care business functions. The suggestions in this article are important for all of those involved in a large-scale pandemic or disaster with multiple critically ill or injured patients, including front-line clinicians, hospital administrators, and public health or government officials. The Business and Continuity of Operations Panel followed the American College of Chest Physicians (CHEST) Guidelines Oversight Committee's methodology in developing key questions regarding medication and supply shortages and the impact disasters may have on healthcare IT. Task force members met in person to develop the 13 key questions believed to be most relevant for Business and Continuity of Operations. A systematic literature review was then performed for relevant articles and documents, reports, and gray literature reported since 2007. No studies of sufficient quality were identified upon which to make evidence-based recommendations. Therefore, the panel developed expert opinion-based suggestions using a modified Delphi process. Eighteen suggestions addressing mitigation strategies for supply chain vulnerabilities including medications and IT were generated. Suggestions offered to hospitals and health system leadership regarding medication and supply shortages include: (1) purchase key medications and supplies from more than one supplier, (2) substituted medications or supplies should ideally be similar to those already used by an institution's providers, (3) inventories should be tracked electronically to monitor medication/supply levels, (4) consider higher inventories of medications and supplies known or projected to be in short supply, (5) institute alternate use protocols when a (potential) shortage is identified, and 6) support government and nongovernmental organizations in efforts to address supply chain vulnerability. Health-care IT can be damaged in a disaster, and hospitals and health system leadership should have plans for urgently reestablishing local area networks. Planning should include using portable technology, plans for providing power, maintenance of a patient database that can accompany each patient, and protection of patient privacy. Additionally, long-term planning should include prioritizing servers and memory disk drives and possibly increasing inventory of critical IT supplies in preparedness planning. The provision of care to the critically ill or injured during a pandemic or disaster is dependent on key processes, such as the supply chain, and infrastructure, such as IT systems. Hospitals and health systems will help minimize the impact of medication and supply shortages with a focused strategy using the steps suggested. IT preparedness for maintaining local area networks, functioning clinical information systems, and adequate server and memory storage capacity will greatly enhance preparedness for hospital and health system clinical and business operations.

  18. Business and Continuity of Operations

    PubMed Central

    Tosh, Pritish K.; Feldman, Henry; Christian, Michael D.; Devereaux, Asha V.; Kissoon, Niranjan; Christian, Michael D.; Devereaux, Asha V.; Dichter, Jeffrey R.; Kissoon, Niranjan; Rubinson, Lewis; Amundson, Dennis; Anderson, Michael R.; Balk, Robert; Barfield, Wanda D.; Bartz, Martha; Benditt, Josh; Beninati, William; Berkowitz, Kenneth A.; Daugherty Biddison, Lee; Braner, Dana; Branson, Richard D; Burkle, Frederick M.; Cairns, Bruce A.; Carr, Brendan G.; Courtney, Brooke; DeDecker, Lisa D.; De Jong, Marla J.; Dominguez-Cherit, Guillermo; Dries, David; Einav, Sharon; Erstad, Brian L.; Etienne, Mill; Fagbuyi, Daniel B.; Fang, Ray; Feldman, Henry; Garzon, Hernando; Geiling, James; Gomersall, Charles D.; Grissom, Colin K.; Hanfling, Dan; Hick, John L.; Hodge, James G.; Hupert, Nathaniel; Ingbar, David; Kanter, Robert K.; King, Mary A.; Kuhnley, Robert N.; Lawler, James; Leung, Sharon; Levy, Deborah A.; Lim, Matthew L.; Livinski, Alicia; Luyckx, Valerie; Marcozzi, David; Medina, Justine; Miramontes, David A.; Mutter, Ryan; Niven, Alexander S.; Penn, Matthew S.; Pepe, Paul E.; Powell, Tia; Prezant, David; Reed, Mary Jane; Rich, Preston; Rodriquez, Dario; Roxland, Beth E.; Sarani, Babak; Shah, Umair A.; Skippen, Peter; Sprung, Charles L.; Subbarao, Italo; Talmor, Daniel; Toner, Eric S.; Tosh, Pritish K.; Upperman, Jeffrey S.; Uyeki, Timothy M.; Weireter, Leonard J.; West, T. Eoin; Wilgis, John; Ornelas, Joe; McBride, Deborah; Reid, David; Baez, Amado; Baldisseri, Marie; Blumenstock, James S.; Cooper, Art; Ellender, Tim; Helminiak, Clare; Jimenez, Edgar; Krug, Steve; Lamana, Joe; Masur, Henry; Mathivha, L. Rudo; Osterholm, Michael T.; Reynolds, H. Neal; Sandrock, Christian; Sprecher, Armand; Tillyard, Andrew; White, Douglas; Wise, Robert; Yeskey, Kevin

    2014-01-01

    BACKGROUND: During disasters, supply chain vulnerabilities, such as power, transportation, and communication, may affect the delivery of medications and medical supplies and hamper the ability to deliver critical care services. Disasters also have the potential to disrupt information technology (IT) in health-care systems, resulting in interruptions in patient care, particularly critical care, and other health-care business functions. The suggestions in this article are important for all of those involved in a large-scale pandemic or disaster with multiple critically ill or injured patients, including front-line clinicians, hospital administrators, and public health or government officials. METHODS: The Business and Continuity of Operations Panel followed the American College of Chest Physicians (CHEST) Guidelines Oversight Committee’s methodology in developing key questions regarding medication and supply shortages and the impact disasters may have on healthcare IT. Task force members met in person to develop the 13 key questions believed to be most relevant for Business and Continuity of Operations. A systematic literature review was then performed for relevant articles and documents, reports, and gray literature reported since 2007. No studies of sufficient quality were identified upon which to make evidence-based recommendations. Therefore, the panel developed expert opinion-based suggestions using a modified Delphi process. RESULTS: Eighteen suggestions addressing mitigation strategies for supply chain vulnerabilities including medications and IT were generated. Suggestions offered to hospitals and health system leadership regarding medication and supply shortages include: (1) purchase key medications and supplies from more than one supplier, (2) substituted medications or supplies should ideally be similar to those already used by an institution’s providers, (3) inventories should be tracked electronically to monitor medication/supply levels, (4) consider higher inventories of medications and supplies known or projected to be in short supply, (5) institute alternate use protocols when a (potential) shortage is identified, and 6) support government and nongovernmental organizations in efforts to address supply chain vulnerability. Health-care IT can be damaged in a disaster, and hospitals and health system leadership should have plans for urgently reestablishing local area networks. Planning should include using portable technology, plans for providing power, maintenance of a patient database that can accompany each patient, and protection of patient privacy. Additionally, long-term planning should include prioritizing servers and memory disk drives and possibly increasing inventory of critical IT supplies in preparedness planning. CONCLUSIONS: The provision of care to the critically ill or injured during a pandemic or disaster is dependent on key processes, such as the supply chain, and infrastructure, such as IT systems. Hospitals and health systems will help minimize the impact of medication and supply shortages with a focused strategy using the steps suggested. IT preparedness for maintaining local area networks, functioning clinical information systems, and adequate server and memory storage capacity will greatly enhance preparedness for hospital and health system clinical and business operations. PMID:25144857

  19. ORION Media Event at LASF

    NASA Image and Video Library

    2014-12-19

    Lockheed Martin Manager Jules Schneider speaks to members of the media during a viewing of NASA's Orion spacecraft at the Launch Abort System Facility at NASA's Kennedy Space Center in Florida. The spacecraft's cross-country return, a 2,700 mile road trip from Naval Base San Diego to Kennedy, sets the stage for in-depth analysis of data obtained during Orion's trip to space. It will provide engineers detailed information on how the spacecraft fared during its two-orbit, 4.5-hour flight test, completed on Dec. 5. The Ground Systems Development and Operations Program led the recovery, offload and transportation efforts.

  20. ORION Media Event at LASF

    NASA Image and Video Library

    2014-12-19

    Lockheed Martin Manager Jules Schneider speaks to members of the media during a viewing of NASA's Orion spacecraft at the Launch Abort System Facility at NASA's Kennedy Space Center in Florida. The spacecraft's cross-country return, a 2,700 mile road trip from Naval Base San Diego to Kennedy, sets the stage for in-depth analysis of data obtained during Orion's trip to space. It will provide engineers with detailed information on how the spacecraft fared during its two-orbit, 4.5-hour flight test, completed on Dec. 5. The Ground Systems Development and Operations Program led the recovery, offload and transportation efforts.

  1. KSC-2014-4880

    NASA Image and Video Library

    2014-12-19

    CAPE CANAVERAL, Fla. -- The U.S. Flag is in view on NASA's Orion spacecraft inside the Launch Abort System Facility at NASA's Kennedy Space Center in Florida during a media event. Orion made the 8-day, 2,700 mile overland trip back to Kennedy from Naval Base San Diego in California. Analysis of date obtained during its two-orbit, four-and-a-half hour mission Dec. 5 will provide engineers with detailed information on how the spacecraft fared. The Ground Systems Development and Operations Program led the recovery, offload and transportation efforts. For more information, visit www.nasa.gov/orion. Photo credit: NASA/Dimitri Gerondidakis

  2. KSC-2014-4879

    NASA Image and Video Library

    2014-12-19

    CAPE CANAVERAL, Fla. -- NASA's Orion spacecraft has been uncrated and is inside the Launch Abort System Facility at NASA's Kennedy Space Center in Florida during a media event. Orion made the 8-day, 2,700 mile overland trip back to Kennedy from Naval Base San Diego in California. Analysis of date obtained during its two-orbit, four-and-a-half hour mission Dec. 5 will provide engineers with detailed information on how the spacecraft fared. The Ground Systems Development and Operations Program led the recovery, offload and transportation efforts. For more information, visit www.nasa.gov/orion. Photo credit: NASA/Dimitri Gerondidakis

  3. 20131201-1231_Green Machine Florida Canyon Hourly Data

    DOE Data Explorer

    Thibedeau, Joe

    2014-01-08

    Employing innovative product developments to demonstrate financial and technical viability of producing electricity from low temperature geothermal fluids, coproduced in a mining operation, by employing ElectraTherm's modular and mobile heat-to-power "micro geothermal" power plant with output capacity expected in the 30-70kWe range. The Green Machine is an Organic Rankine Cycle power plant. The Florida Canyon machine is powered by geothermal brine with air cooled condensing. The data provided is an hourly summary from 01 Dec to 31 Dec 2013.

  4. Core Operations of the Metals and Ceramics Information Center (A DoD information Analysis Center)

    DTIC Science & Technology

    1990-08-30

    1214 Hy-Tuf Steel 12 Sep 4208 Wassaloy? 36 Dec 1215 Nitralloy 135 Mod 8 Dec 4310 Haynes Alloy 188 40 1987 Mar 1203 4140 Sterl 34 Mar 1601 A-286 Steel 37...BE /Ej*Az5 pofj.’t FRACT UjPE CATA FOR AISI 521 ,O ALLCY STEEL r-L’I1 AFS. 6 L Pesconm C OPY OF SELECTED DATA FAxED ,-T LCCP"EED 1MILES A AE OPol.es

  5. A New Age for Aerostats: Proving Airfield-Centric MANPADS Defense for Civil Aircraft Supporting Military Operations

    DTIC Science & Technology

    2010-04-01

    Maintaining Readiness, RAND Report MR-1506 (Santa Monica, CA: RAND, 2003, 58. 15 Graham, David R . Statement before the U.S. Congress Committee on...2. 19 Ibid., 4. 20 Ibid., 2. 21 Bolkcom, Christopher, CRAF, 9. 22 Graham, David R ., 3. 23 Cortez, Robert K. Statement before the U.S...Retrieved from http://www.state.gov/ r /pa/prs/ps/2009/july/126397.htm on 8 Dec 2009. 30 GlobalSecurity.org. “Man Portable Air Defense Systems (MANPADS

  6. P6 Truss, port side of the Integrated Equipment Assembly (IEA)

    NASA Image and Video Library

    2000-12-03

    STS097-374-015 (5 December 2000) --- This high angle view shows astronaut Carlos I. Noriega, STS-97 mission specialist, traversing over Endeavour's cargo bay during the flight's first space walk on Dec. 5, 2000. Astronaut Joseph R. Tanner, mission specialist, was near the top of the P6 truss structure when he exposed the 35mm frame. The Canadian-built Remote Manipulator System (RMS) arm, instrumental in the current operations, can be seen at bottom right.

  7. NASA Redox Project status summary

    NASA Technical Reports Server (NTRS)

    Hagedorn, N. H.

    1983-01-01

    This report is a summary of the results of the Redox Project effort during Cy 1982. It was presented at the Fifth U.S. Department of Energy Battery and Electrochemical Contractors Conference, Arlington, Va., Dec. 7-9, 1982. The major development during 1982 was the shift from Redox system operation at 25 C with unmixed reactants to operation at 65 C with mixed reactants. This change has made possible a two- or three-fold increase in operating current density, to about 65 mA/sq cm, and an increase in reactant utilization from 40% to about 90%. Both of these improvements will lead to significant system cost reductions. Contract studies have indicated that Redox reactant costs also will be moderate. A new catalyst for the chromuim electrode offers all the advantages of the conventional gold-lead catalyst while being easier to apply and more forgiving in use.

  8. At the Cosmonaut Hotel crew quarters in Baikonur, Kazakhstan, Expedition 46-47 crewmember Tim Kopra of NASA took a turn on a tilt table to test his vestibular system Dec. 9 as part of his pre-launch training. Kopra, Tim Peake of the European Space Agency and Yuri Malenchenko of the Russian Federal Space Agency will launch Dec. 15 on their Soyuz TMA-19M spacecraft for a six-month mission on the International Space Station...NASA/Victor Zelentsov.

    NASA Image and Video Library

    2015-12-09

    At the Cosmonaut Hotel crew quarters in Baikonur, Kazakhstan, Expedition 46-47 crewmember Tim Kopra of NASA took a turn on a tilt table to test his vestibular system Dec. 9 as part of his pre-launch training. Kopra, Tim Peake of the European Space Agency and Yuri Malenchenko of the Russian Federal Space Agency will launch Dec. 15 on their Soyuz TMA-19M spacecraft for a six-month mission on the International Space Station. NASA/Victor Zelentsov

  9. At the Cosmonaut Hotel crew quarters in Baikonur, Kazakhstan, Expedition 46-47 crewmember Tim Peake of the European Space Agency took a turn in a spinning chair to test his vestibular system Dec. 9 as part of his pre-launch training. Peake, Yuri Malenchenko of the Russian Federal Space Agency (Roscosmos) and Tim Kopra of NASA will launch Dec. 15 on their Soyuz TMA-19M spacecraft for a six-month mission on the International Space Station...NASA/Victor Zelentsov.

    NASA Image and Video Library

    2015-12-09

    At the Cosmonaut Hotel crew quarters in Baikonur, Kazakhstan, Expedition 46-47 crewmember Tim Peake of the European Space Agency took a turn in a spinning chair to test his vestibular system Dec. 9 as part of his pre-launch training. Peake, Yuri Malenchenko of the Russian Federal Space Agency (Roscosmos) and Tim Kopra of NASA will launch Dec. 15 on their Soyuz TMA-19M spacecraft for a six-month mission on the International Space Station. NASA/Victor Zelentsov

  10. iss045e152270

    NASA Image and Video Library

    2015-12-01

    ISS045e152270 (12/01/2015) --- NASA astronaut Kjell Lindgren takes images of the Earth on board the International Space Station on Dec. 1, 2015 from the Cupola, the 360 degree viewing and robotic Canadarm 2 control area. Later this area will be used by Lindgren and NASA astronaut Scott Kelly to use the station’s Canadarm 2 robotic arm to reach out and grapple the Orbital ATK CRS-4 "Cygnus" spaceship full of equipment and supplies.

  11. Two-Dimensional Signal Processing, Optical Information Storage and Processing, and Electromagnetic Measurements

    DTIC Science & Technology

    1992-07-15

    Modeling SENIOR PRINCIPAL INVESTIGATOR: R. M. Mersereau, Regents’ Professor SCIENTIFIC PERSONNEL: F. J. Malassenet, (Ph.D. received, Dec. 1991) T. R. Gardos ...multiprocessor environment. RESEARCH ACCOMPLISHMENTS: Students Gardos , Martucci, Rao, and Truong were partially supported using funds supplied by Georgia...pp. 21- 56, 1991. [4] T. R. Gardos and R. M. Mersereau, "FIR Filtering on a Lattice with Periodically Deleted Samples," Proc. 1991 IEEE Int. Conf

  12. A High-Temperature Combinatorial Technique for the Thermal Analysis of Materials

    DTIC Science & Technology

    2008-07-14

    the calorimetric cell. The power dissipated in the thermistor is determined experimentally from the current supplied to the thermistor and the...electronics unit operates as a power supply for the PnSC sensors and as a data acquisition (DAQ) system for the input/output signals from each sensor. Both...the power supply and DAQ operations are galvanically isolated to ensure a maximum signal to noise ratio for the acquired signals. The control

  13. ADAMS: AIRLAB data management system user's guide

    NASA Technical Reports Server (NTRS)

    Conrad, C. L.; Ingogly, W. F.; Lauterbach, L. A.

    1986-01-01

    The AIRLAB Data Management System (ADAMS) is an online environment that supports research at NASA's AIRLAB. ADAMS provides an easy to use interactive interface that eases the task of documenting and managing information about experiments and improves communication among project members. Data managed by ADAMS includes information about experiments, data sets produced, software and hardware available in AIRLAB as well as that used in a particular experiment, and an on-line engineer's notebook. The User's Guide provides an overview of the ADAMS system as well as details of the operations available within ADAMS. A tutorial section takes the user step-by-step through a typical ADAMS session. ADAMS runs under the VAX/VMS operating system and uses the ORACLE database management system and DEC/FMS (the Forms Management System). ADAMS can be run from any VAX connected via DECnet to the ORACLE host VAX. The ADAMS system is designed for simplicity, so interactions within the underlying data management system and communications network are hidden from the user.

  14. [Comparison of perforated metal ceiling systems (supported airflow ceilings) with laminar airflow ceilings in type A (DIN 1946 T.4) operating rooms under surgical conditions].

    PubMed

    Bischoff, W E; Kindermann, A; Sander, U; Sander, J

    1995-10-01

    In eleven centrally ventilated operating theatres the concentration of particles and airborne germs in wound vicinity was measured on three workdays. Five theatres were equipped with air supply ceilings with supporting flow outlets (supporting flow ceilings), five with laminar air flow ceilings and one with an air supply ceiling, a body exhaust system and a partition wall between the anesthetic and operating areas. Under routine conditions the air supply of the laminar air flow ceiling with its lower turbulence shielded the operating field from the largely staff-related air contamination in the rest of the theatre better than in the case of the supporting flow ceilings. Particles and airborne germs were removed from the endangered wound area faster. A spatial separation between the anesthetic and the operating areas as well as a body exhaust system lead to a considerable reduction of the contamination. Two theatres were conspicuous by reason of their considerably raised values due to defective control engineering and the wrongly positioning of the operating table. From the point of view of ventilation technique the laminar air flow ceilings with lower turbulence are superior to air supply ceilings with supporting flow outlets in the working day of an operating theatre. In order to minimize the influence of the staff, which up till now has been neglected in testing specifications, constructional possibilities such as the size of ceiling, the partitioning off of operating and anaesthetic areas and the positioning of the operating table in relation to the incoming air should be coordinated rationally. Taking measurements regularly during operations can provide the impulse for considerable improvements in both operational and planning phases.

  15. 77 FR 12076 - Final Programmatic Environmental Impact Statement and Integrated Water Resource Management Plan...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-28

    ..., Systems Modification, and Water Supply) which are comprised of seven elements (listed below). The Habitat... existing facilities and operations in order to improve conditions for fish and to improve water supply. The... elements. The third component, Water Supply, is intended to improve water supply for agricultural and...

  16. KSC-2014-4873

    NASA Image and Video Library

    2014-12-19

    CAPE CANAVERAL, Fla. -- NASA's Orion spacecraft is viewed by members of the media at the Launch Abort System Facility at NASA's Kennedy Space Center in Florida. Speaking to the media during the viewing opportunity is Jules Schneider, Lockheed Martin Manager. Behind him, from left, are Glenn Chin, Orion Production Operations manager and Phil Weber and Lou Garcia, with the Ground Systems Development and Operations Program, or GSDO. Orion made the 8-day, 2,700 mile overland trip back to Kennedy from Naval Base San Diego in California. Analysis of date obtained during its two-orbit, four-and-a-half hour mission Dec. 5 will provide engineers with detailed information on how the spacecraft fared. GSDO led the recovery, offload and transportation efforts. For more information, visit www.nasa.gov/orion. Photo credit: NASA/Dimitri Gerondidakis

  17. KSC-2014-4874

    NASA Image and Video Library

    2014-12-19

    CAPE CANAVERAL, Fla. -- NASA's Orion spacecraft is viewed by members of the media at the Launch Abort System Facility at NASA's Kennedy Space Center in Florida. Speaking to the media during the viewing opportunity is Phil Weber, with the Ground Systems Development and Operations Program, or GSDO. At left is Jules Schneider, Lockheed Martin manager. At right is Glenn Chin, Orion Production Operations, and Lou Garcia, with GSDO. Orion made the 8-day, 2,700 mile overland trip back to Kennedy from Naval Base San Diego in California. Analysis of date obtained during its two-orbit, four-and-a-half hour mission Dec. 5 will provide engineers detailed information on how the spacecraft fared. GSDO led the recovery, offload and transportation efforts. For more information, visit www.nasa.gov/orion. Photo credit: NASA/Dimitri Gerondidakis

  18. Aerial of the Orion EFT-1 Arrival at KSC

    NASA Image and Video Library

    2014-12-18

    An aerial view near NASA's Kennedy Space Center Visitor Complex reveals the Orion crew module, enclosed in its crew module transportation fixture and secured on a flatbed truck on the NASA Causeway that leads to the entrance gate to Kennedy Space Center in Florida. Orion made the 2,700 mile overland trip from Naval Base San Diego in California. The spacecraft was recovered from the Pacific Ocean after completing a two-orbit, four-and-a-half hour mission Dec. 5 to test systems critical to crew safety, including the launch abort system, the heat shield and the parachute system. The Ground Systems Development and Operations Program led the recovery, offload and transportation efforts.

  19. Aerial of the Orion EFT-1 Arrival at KSC

    NASA Image and Video Library

    2014-12-18

    An aerial view reveals the Orion crew module, enclosed in its crew module transportation fixture and secured on a flatbed truck that is proceeding along the NASA Causeway at Kennedy Space Center in Florida. In the background is the iconic Vehicle Assembly Building. Orion made the 2,700 mile overland trip from Naval Base San Diego in California. The spacecraft was recovered from the Pacific Ocean after completing a two-orbit, four-and-a-half hour mission Dec. 5 to test systems critical to crew safety, including the launch abort system, the heat shield and the parachute system. The Ground Systems Development and Operations Program led the recovery, offload and transportation efforts.

  20. Aerial of the Orion EFT-1 Arrival at KSC

    NASA Image and Video Library

    2014-12-18

    An aerial view near NASA's Kennedy Space Center Visitor Complex reveals the Orion crew module, enclosed in its crew module transportation fixture and secured on a flatbed truck that is proceeding along the NASA Causeway to the entrance gate to Kennedy Space Center in Florida. Orion made the 2,700 mile overland trip from Naval Base San Diego in California. The spacecraft was recovered from the Pacific Ocean after completing a two-orbit, four-and-a-half hour mission Dec. 5 to test systems critical to crew safety, including the launch abort system, the heat shield and the parachute system. The Ground Systems Development and Operations Program led the recovery, offload and transportation efforts.

  1. Aerial of the Orion EFT-1 Arrival at KSC

    NASA Image and Video Library

    2014-12-18

    An aerial view near NASA's Kennedy Space Center Visitor Complex reveals the Orion crew module, enclosed in its crew module transportation fixture and secured on a flatbed truck that is proceeding onto the NASA Causeway that leads to the entrance gate to Kennedy Space Center in Florida. Orion made the 2,700 mile overland trip from Naval Base San Diego in California. The spacecraft was recovered from the Pacific Ocean after completing a two-orbit, four-and-a-half hour mission Dec. 5 to test systems critical to crew safety, including the launch abort system, the heat shield and the parachute system. The Ground Systems Development and Operations Program led the recovery, offload and transportation efforts.

  2. Development of Air Supply System for Gas Turbine Combustor Test Rig

    NASA Astrophysics Data System (ADS)

    Kamarudin, Norhaimi Izlan; Hanafi, Muhammad; Mantari, Asril Rajo; Jaafar, Mohammad Nazri Mohd

    2010-06-01

    Complete combustion process occurs when the air and fuel burns at their stoichiometric ratio, which determines the appropriate amount of air needed to be supplied to the combustion chamber. Thus, designing an appropriate air supply system is important, especially for multi-fuel combustion. Each type of fuel has different molecular properties and structures which influence the stoichiometric ratio. Therefore, the designed air supply system must be operable for different types of fuels. Basically, the design of the air supply system is at atmospheric pressure. It is important that the air which enters the combustion chamber is stable and straight. From the calculation, the maximum required mass flow rate of air is 0.1468kg/s.

  3. Numerical Method for Darcy Flow Derived Using Discrete Exterior Calculus

    NASA Astrophysics Data System (ADS)

    Hirani, A. N.; Nakshatrala, K. B.; Chaudhry, J. H.

    2015-05-01

    We derive a numerical method for Darcy flow, and also for Poisson's equation in mixed (first order) form, based on discrete exterior calculus (DEC). Exterior calculus is a generalization of vector calculus to smooth manifolds and DEC is one of its discretizations on simplicial complexes such as triangle and tetrahedral meshes. DEC is a coordinate invariant discretization, in that it does not depend on the embedding of the simplices or the whole mesh. We start by rewriting the governing equations of Darcy flow using the language of exterior calculus. This yields a formulation in terms of flux differential form and pressure. The numerical method is then derived by using the framework provided by DEC for discretizing differential forms and operators that act on forms. We also develop a discretization for a spatially dependent Hodge star that varies with the permeability of the medium. This also allows us to address discontinuous permeability. The matrix representation for our discrete non-homogeneous Hodge star is diagonal, with positive diagonal entries. The resulting linear system of equations for flux and pressure are saddle type, with a diagonal matrix as the top left block. The performance of the proposed numerical method is illustrated on many standard test problems. These include patch tests in two and three dimensions, comparison with analytically known solutions in two dimensions, layered medium with alternating permeability values, and a test with a change in permeability along the flow direction. We also show numerical evidence of convergence of the flux and the pressure. A convergence experiment is included for Darcy flow on a surface. A short introduction to the relevant parts of smooth and discrete exterior calculus is included in this article. We also include a discussion of the boundary condition in terms of exterior calculus.

  4. Solar Thermal Upper Stage Cryogen System Engineering Checkout Test

    NASA Technical Reports Server (NTRS)

    Olsen, A. D; Cady, E. C.; Jenkins, D. S.

    1999-01-01

    The Solar Thermal Upper Stage technology (STUSTD) program is a solar thermal propulsion technology program cooperatively sponsored by a Boeing led team and by NASA MSFC. A key element of its technology program is development of a liquid hydrogen (LH2) storage and supply system which employs multi-layer insulation, liquid acquisition devices, active and passive thermodynamic vent systems, and variable 40W tank heaters to reliably provide near constant pressure H2 to a solar thermal engine in the low-gravity of space operation. The LH2 storage and supply system is designed to operate as a passive, pressure fed supply system at a constant pressure of about 45 psia. During operation of the solar thermal engine over a small portion of the orbit the LH2 storage and supply system propulsively vents through the enjoy at a controlled flowrate. During the long coast portion of the orbit, the LH2 tank is locked up (unvented). Thus, all of the vented H2 flow is used in the engine for thrust and none is wastefully vented overboard. The key to managing the tank pressure and therefore the H2 flow to the engine is to manage and balance the energy flow into the LH2 tank with the MLI and tank heaters with the energy flow out of the LH2 tank through the vented H2 flow. A moderate scale (71 cu ft) LH2 storage and supply system was installed and insulated at the NASA MSFC Test Area 300. The operation of the system is described in this paper. The test program for the LH2 system consisted of two parts: 1) a series of engineering tests to characterize the performance of the various components in the system: and 2) a 30-day simulation of a complete LEO and GEO transfer mission. This paper describes the results of the engineering tests, and correlates these results with analytical models used to design future advanced Solar Orbit Transfer Vehicles.

  5. Performance Characterization of a Lithium-ion Gel Polymer Battery Power Supply System for an Unmanned Aerial Vehicle

    NASA Technical Reports Server (NTRS)

    Reid, Concha M.; Manzo, Michelle A.; Logan, Michael J.

    2004-01-01

    Unmanned aerial vehicles (UAVs) are currently under development for NASA missions, earth sciences, aeronautics, the military, and commercial applications. The design of an all electric power and propulsion system for small UAVs was the focus of a detailed study. Currently, many of these small vehicles are powered by primary (nonrechargeable) lithium-based batteries. While this type of battery is capable of satisfying some of the mission needs, a secondary (rechargeable) battery power supply system that can provide the same functionality as the current system at the same or lower system mass and volume is desired. A study of commercially available secondary battery cell technologies that could provide the desired performance characteristics was performed. Due to the strict mass limitations and wide operating temperature requirements of small UAVs, the only viable cell chemistries were determined to be lithium-ion liquid electrolyte systems and lithium-ion gel polymer electrolyte systems. Two lithium-ion gel polymer cell designs were selected as candidates and were tested using potential load profiles for UAV applications. Because lithium primary batteries have a higher specific energy and energy density, for the same mass and volume allocation, the secondary batteries resulted in shorter flight times than the primary batteries typically provide. When the batteries were operated at lower ambient temperatures (0 to -20 C), flight times were even further reduced. Despite the reduced flight times demonstrated, for certain UAV applications, the secondary batteries operated within the acceptable range of flight times at room temperature and above. The results of this testing indicate that a secondary battery power supply system can provide some benefits over the primary battery power supply system. A UAV can be operated for hundreds of flights using a secondary battery power supply system that provides the combined benefits of rechargeability and an inherently safer chemistry.

  6. Clinical analysis and classification of dark eye circle.

    PubMed

    Huang, Yau-Li; Chang, Shyue-Luen; Ma, Lih; Lee, Mei-Ching; Hu, Sindy

    2014-02-01

    Dark eye circle (DEC) is a common problem that usually lacks detailed classification in the etiology and structural variations. A newly-developed DEC Assessment Score using Wood's lamp and ultrasonogram will provide a more precise evaluation of DEC for improving treatment results. Sixty-five cases, including eight males and 57 females with a mean age of 38.9 years, were enrolled. DEC were classified into pigmented (brown), vascular (blue to purple), structural, and mixed type by Wood's lamp and ultrasonogram. A scoring system with nine parameters, including brown hue, pigmented lesions, blue/pink/purple hue, periorbital puffiness, shadow hue, infraorbital palpebral bags, infraorbital grooves, blepharoptosis, and skin type, was used for clinical evaluation. Pigmented, vascular, structural, and mixed types of DEC represented 5%, 14%, 3%, and 78%, respectively. Thirty-three cases with periorbital puffiness were found to have higher "pre-septal thickness" than those of 20 controlled cases (P = 0.032). Fourteen patients with infraorbital palpebral bags were proved to have protruded retroseptal fat pads by ultrasonography. Pigmentation and vascular and structural components may play important roles in DEC. Detailed classification of DEC types will access physicians in the decision of appropriate therapeutic modalities. © 2013 The International Society of Dermatology.

  7. Ligncellulosic feedstock supply systems with intermodal and overseas transportation

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ric Hoefnagels; Kara Cafferty; Erin Searcy

    2014-12-01

    With growing demand for biomass from industrial uses and international trade, the logistic operations required to economically move the biomass from the field or forest to the end users have become increasingly complex. In addition to economics, understanding energy and GHG emissions is required to design cost effective, sustainable logistic process operations; in order to improve international supply chains it is also important to understate their interdependencies and related uncertainties. This article presents an approach to assess lignocellulosic feedstock supply systems at the operational level. For this purpose, the Biomass Logistic Model (BLM) has been linked with the Geographic Informationmore » Systems based Biomass Intermodal Transportation model (BIT-UU) and extended with inter-continental transport routes. Case studies of herbaceous and woody biomass, produced in the U.S. Midwest and U.S. Southeast, respectively, and shipped to Europe for conversion to Fischer-Tropsch (FT) diesel are included to demonstrate how intermodal transportation and, in particular, overseas shipping integrates with the bioenergy supply chains. For the cases demonstrated, biomass can be supplied at 99 € Mg-1 to 117 € Mg-1 (dry) and converted to FT-diesel at 19 € GJ-1 to 24 € GJ-1 depending on the feedstock type and location, intermediate (chips or pellets) and size of the FT-diesel production plant. With the flexibility to change the design of supply chains as well as input variables, many alternative supply chain cases can be assessed.« less

  8. A Numerical Simulation (Study) of a Strong West Coast December 2014 Winter Storm

    NASA Astrophysics Data System (ADS)

    Smelser, I.; Xu, L.; Amerault, C. M.; Baker, N. L.; Satterfield, E.; Chua, B.

    2016-12-01

    From December 10 through December 13, 2014, a powerful winter storm swept across the western US coastal states bringing widespread power outages, numerous downed trees and power lines, heavy rains, flooding and even a tornado in the Los Angeles basin. This windstorm was the strongest since October 2009, and was similar to classic wind storms such as the 1962 Columbus Day Storm (Read, 2015).The storm started developing over the Pacific Ocean north of Hawaii on Nov. 30, and formed an atmospheric river that eventually stretched from Hawaii to the west coast. The storm initially hit the Pacific Northwest on Dec. 9th and then split. The highest precipitation amounts started in British Colombia and moved south along the coast. By the Dec. 11th, the highest precipitation amounts were near San Francisco (CA). The peak wind gust (14.4 ms-1) for Monterey (CA) occurred at 1116Z on Dec. 11th while the heaviest 6-hr precipitation (42.9 mm) occurred between 18Z on Dec. 11th to 00Z on Dec. 12th. By Dec. 12th, the storm was centered over Southern California.This storm was poorly forecast by many operational NWP models even 2-3 days in advance (Mass, 2014). The NCEP Global Forecast System (GFS) showed considerably variability between successive model runs, and significant differences existed between Environment Canada, UK Met Office and ECMWF model forecasts. To study this extreme weather event, we used the Navy global (NAVGEM) and mesoscale (COAMPS®) NWP models, and compared the resulting forecasts to observations, satellite imagery and ECMWF (TIGGE) forecasts. NAVGEM, with Hybrid 4DVar, was run with a resolution of 31 km, and generated the boundary conditions for COAMPS® 4DVar and forecasts, that were run with triple-nested grids of 27, 9, and 3 km. The MesoWest data from the University of Utah were used for forecast verification, and to locate the times of highest precipitation and wind speed for different points along the coast. Both the online API and the python module were used to access and pull information from the data base. Overall, both NAVGEM and COAMPS® predicted the storm well. NAVGEM predicted the storm to be slower and more powerful than the analyses. The NAVGEM analysis and corresponding 5-day forecast accumulated 6-hr precipitation (Fig. 1) for Dec. 12th at 00Z agree well with the observed precipitation (4.29 cm) for Monterey (KMRY).

  9. Integrating operation design into infrastructure planning to foster robustness of planned water systems

    NASA Astrophysics Data System (ADS)

    Bertoni, Federica; Giuliani, Matteo; Castelletti, Andrea

    2017-04-01

    Over the past years, many studies have looked at the planning and management of water infrastructure systems as two separate problems, where the dynamic component (i.e., operations) is considered only after the static problem (i.e., planning) has been resolved. Most recent works have started to investigate planning and management as two strictly interconnected faces of the same problem, where the former is solved jointly with the latter in an integrated framework. This brings advantages to multi-purpose water reservoir systems, where several optimal operating strategies exist and similar system designs might perform differently on the long term depending on the considered short-term operating tradeoff. An operationally robust design will be therefore one performing well across multiple feasible tradeoff operating policies. This work aims at studying the interaction between short-term operating strategies and their impacts on long-term structural decisions, when long-lived infrastructures with complex ecological impacts and multi-sectoral demands to satisfy (i.e., reservoirs) are considered. A parametric reinforcement learning approach is adopted for nesting optimization and control yielding to both optimal reservoir design and optimal operational policies for water reservoir systems. The method is demonstrated on a synthetic reservoir that must be designed and operated for ensuring reliable water supply to downstream users. At first, the optimal design capacity derived is compared with the 'no-fail storage' computed through Rippl, a capacity design function that returns the minimum storage needed to satisfy specified water demands without allowing supply shortfall. Then, the optimal reservoir volume is used to simulate the simplified case study under other operating objectives than water supply, in order to assess whether and how the system performance changes. The more robust the infrastructural design, the smaller the difference between the performances of different operating strategies.

  10. Computer model of Raritan River Basin water-supply system in central New Jersey

    USGS Publications Warehouse

    Dunne, Paul; Tasker, Gary D.

    1996-01-01

    This report describes a computer model of the Raritan River Basin water-supply system in central New Jersey. The computer model provides a technical basis for evaluating the effects of alternative patterns of operation of the Raritan River Basin water-supply system during extended periods of below-average precipitation. The computer model is a continuity-accounting model consisting of a series of interconnected nodes. At each node, the inflow volume, outflow volume, and change in storage are determined and recorded for each month. The model runs with a given set of operating rules and water-use requirements including releases, pumpages, and diversions. The model can be used to assess the hypothetical performance of the Raritan River Basin water- supply system in past years under alternative sets of operating rules. It also can be used to forecast the likelihood of specified outcomes, such as the depletion of reservoir contents below a specified threshold or of streamflows below statutory minimum passing flows, for a period of up to 12 months. The model was constructed on the basis of current reservoir capacities and the natural, unregulated monthly runoff values recorded at U.S. Geological Survey streamflow- gaging stations in the basin.

  11. U.S. healthcare fix: leveraging the lessons from the food supply chain.

    PubMed

    Kumar, Sameer; Blair, John T

    2013-01-01

    U.S. healthcare costs consistently outpace inflation, causing growing problems of affordability. This trend cannot be sustained indefinitely. The purpose of this study is to use supply-chain tools for macro-level examination of the U.S. healthcare as a business system and identify options and best use practices. We compare the important and successful U.S. food industry to the essential but problematic U.S. healthcare industry. Supply chain strategies leading to food business operations success are examined and healthcare applications suggested. We emphasize "total cost of ownership" which includes all costs incurred by all stakeholders of U.S. healthcare, including maintenance and cleanup, not just the initial purchase price. U.S. hospitals and clinics can use supply chain strategies in a total cost of ownership framework to reduce healthcare costs while maintaining patient care quality. Supply chain strategies of resource pooling, mass customization, centralized logistics, specialization, postponement and continuous improvement that have been successfully used in the U.S. food industry should be more widely applied to the U.S. healthcare industry. New and growing areas of telemedicine and medical tourism should be included in the supply chain analysis of U.S. healthcare. Valid statistical analysis of results in all areas of U.S. healthcare is an important part of the process. U.S. healthcare industry problems are systematic operational and supply chain problems rather than problems with workforce or technology. Examination of the U.S. healthcare industry through a supply chain framework should lead to significant operational improvement in both prevention and treatment of acute and chronic ailments. A rational and unemotional reorganization of the U.S. healthcare system operations, using supply chain strategies, should help reduce healthcare costs while maintaining quality and increasing accessibility.

  12. Discrete exterior calculus discretization of incompressible Navier-Stokes equations over surface simplicial meshes

    NASA Astrophysics Data System (ADS)

    Mohamed, Mamdouh S.; Hirani, Anil N.; Samtaney, Ravi

    2016-05-01

    A conservative discretization of incompressible Navier-Stokes equations is developed based on discrete exterior calculus (DEC). A distinguishing feature of our method is the use of an algebraic discretization of the interior product operator and a combinatorial discretization of the wedge product. The governing equations are first rewritten using the exterior calculus notation, replacing vector calculus differential operators by the exterior derivative, Hodge star and wedge product operators. The discretization is then carried out by substituting with the corresponding discrete operators based on the DEC framework. Numerical experiments for flows over surfaces reveal a second order accuracy for the developed scheme when using structured-triangular meshes, and first order accuracy for otherwise unstructured meshes. By construction, the method is conservative in that both mass and vorticity are conserved up to machine precision. The relative error in kinetic energy for inviscid flow test cases converges in a second order fashion with both the mesh size and the time step.

  13. Highly sensitive vacuum ion pump current measurement system

    DOEpatents

    Hansknecht, John Christopher [Williamsburg, VA

    2006-02-21

    A vacuum system comprising: 1) an ion pump; 2) power supply; 3) a high voltage DC--DC converter drawing power from the power supply and powering the vacuum pump; 4) a feedback network comprising an ammeter circuit including an operational amplifier and a series of relay controlled scaling resistors of different resistance for detecting circuit feedback; 5) an optional power block section intermediate the power supply and the high voltage DC--DC converter; and 6) a microprocessor receiving feedback information from the feedback network, controlling which of the scaling resistors should be in the circuit and manipulating data from the feedback network to provide accurate vacuum measurement to an operator.

  14. Simple constant-current-regulated power supply

    NASA Technical Reports Server (NTRS)

    Priebe, D. H. E.; Sturman, J. C.

    1977-01-01

    Supply incorporates soft-start circuit that slowly ramps current up to set point at turn-on. Supply consists of full-wave rectifier, regulating pass transistor, current feedback circuit, and quad single-supply operational-amplifier circuit providing control. Technique is applicable to any system requiring constant dc current, such as vacuum tube equipment, heaters, or battery charges; it has been used to supply constant current for instrument calibration.

  15. Development of a decision support tool for seasonal water supply management incorporating system uncertainties and operational constraints

    NASA Astrophysics Data System (ADS)

    Wang, H.; Asefa, T.

    2017-12-01

    A real-time decision support tool (DST) for water supply system would consider system uncertainties, e.g., uncertain streamflow and demand, as well as operational constraints and infrastructure outage (e.g., pump station shutdown, an offline reservoir due to maintenance). Such DST is often used by water managers for resource allocation and delivery for customers. Although most seasonal DST used by water managers recognize those system uncertainties and operational constraints, most use only historical information or assume deterministic outlook of water supply systems. This study presents a seasonal DST that incorporates rainfall/streamflow uncertainties, seasonal demand outlook and system operational constraints. Large scale climate-information is captured through a rainfall simulator driven by a Bayesian non-homogeneous Markov Chain Monte Carlo model that allows non-stationary transition probabilities contingent on Nino 3.4 index. An ad-hoc seasonal demand forecasting model considers weather conditions explicitly and socio-economic factors implicitly. Latin Hypercube sampling is employed to effectively sample probability density functions of flow and demand. Seasonal system operation is modelled as a mixed-integer optimization problem that aims at minimizing operational costs. It embeds the flexibility of modifying operational rules at different components, e.g., surface water treatment plants, desalination facilities, and groundwater pumping stations. The proposed framework is illustrated at a wholesale water supplier in Southeastern United States, Tampa Bay Water. The use of the tool is demonstrated in proving operational guidance in a typical drawdown and refill cycle of a regional reservoir. The DST provided: 1) probabilistic outlook of reservoir storage and chance of a successful refill by the end of rainy season; 2) operational expectations for large infrastructures (e.g., high service pumps and booster stations) throughout the season. Other potential use of such DST is also discussed.

  16. Forecasting of Hourly Photovoltaic Energy in Canarian Electrical System

    NASA Astrophysics Data System (ADS)

    Henriquez, D.; Castaño, C.; Nebot, R.; Piernavieja, G.; Rodriguez, A.

    2010-09-01

    The Canarian Archipelago face similar problems as most insular region lacking of endogenous conventional energy resources and not connected to continental electrical grids. A consequence of the "insular fact" is the existence of isolated electrical systems that are very difficult to interconnect due to the considerable sea depths between the islands. Currently, the Canary Islands have six isolated electrical systems, only one utility generating most of the electricity (burning fuel), a recently arrived TSO (REE) and still a low implementation of Renewable Energy Resources (RES). The low level of RES deployment is a consequence of two main facts: the weakness of the stand-alone grids (from 12 MW in El Hierro up to only 1 GW in Gran Canaria) and the lack of space to install RES systems (more than 50% of the land protected due to environmental reasons). To increase the penetration of renewable energy generation, like solar or wind energy, is necessary to develop tools to manage them. The penetration of non manageable sources into weak grids like the Canarian ones causes a big problem to the grid operator. There are currently 104 MW of PV connected to the islands grids (Dec. 2009) and additional 150 MW under licensing. This power presents a serious challenge for the operation and stability of the electrical system. ITC, together with the local TSO (Red Eléctrica de España, REE) started in 2008 and R&D project to develop a PV energy prediction tool for the six Canarian Insular electrical systems. The objective is to supply reliable information for hourly forecast of the generation dispatch programme and to predict daily solar radiation patterns, in order to help program spinning reserves. ITC has approached the task of weather forecasting using different numerical model (MM5 and WRF) in combination with MSG (Meteosat Second Generation) images. From the online data recorded at several monitored PV plants and meteorological stations, PV nominal power and energy produced by every plant in Canary Islands are estimated using a series of theoretical and statistical energy models.

  17. VIRTUAL FRAME BUFFER INTERFACE

    NASA Technical Reports Server (NTRS)

    Wolfe, T. L.

    1994-01-01

    Large image processing systems use multiple frame buffers with differing architectures and vendor supplied user interfaces. This variety of architectures and interfaces creates software development, maintenance, and portability problems for application programs. The Virtual Frame Buffer Interface program makes all frame buffers appear as a generic frame buffer with a specified set of characteristics, allowing programmers to write code which will run unmodified on all supported hardware. The Virtual Frame Buffer Interface converts generic commands to actual device commands. The virtual frame buffer consists of a definition of capabilities and FORTRAN subroutines that are called by application programs. The virtual frame buffer routines may be treated as subroutines, logical functions, or integer functions by the application program. Routines are included that allocate and manage hardware resources such as frame buffers, monitors, video switches, trackballs, tablets and joysticks; access image memory planes; and perform alphanumeric font or text generation. The subroutines for the various "real" frame buffers are in separate VAX/VMS shared libraries allowing modification, correction or enhancement of the virtual interface without affecting application programs. The Virtual Frame Buffer Interface program was developed in FORTRAN 77 for a DEC VAX 11/780 or a DEC VAX 11/750 under VMS 4.X. It supports ADAGE IK3000, DEANZA IP8500, Low Resolution RAMTEK 9460, and High Resolution RAMTEK 9460 Frame Buffers. It has a central memory requirement of approximately 150K. This program was developed in 1985.

  18. ARC2D - EFFICIENT SOLUTION METHODS FOR THE NAVIER-STOKES EQUATIONS (CRAY VERSION)

    NASA Technical Reports Server (NTRS)

    Pulliam, T. H.

    1994-01-01

    ARC2D is a computational fluid dynamics program developed at the NASA Ames Research Center specifically for airfoil computations. The program uses implicit finite-difference techniques to solve two-dimensional Euler equations and thin layer Navier-Stokes equations. It is based on the Beam and Warming implicit approximate factorization algorithm in generalized coordinates. The methods are either time accurate or accelerated non-time accurate steady state schemes. The evolution of the solution through time is physically realistic; good solution accuracy is dependent on mesh spacing and boundary conditions. The mathematical development of ARC2D begins with the strong conservation law form of the two-dimensional Navier-Stokes equations in Cartesian coordinates, which admits shock capturing. The Navier-Stokes equations can be transformed from Cartesian coordinates to generalized curvilinear coordinates in a manner that permits one computational code to serve a wide variety of physical geometries and grid systems. ARC2D includes an algebraic mixing length model to approximate the effect of turbulence. In cases of high Reynolds number viscous flows, thin layer approximation can be applied. ARC2D allows for a variety of solutions to stability boundaries, such as those encountered in flows with shocks. The user has considerable flexibility in assigning geometry and developing grid patterns, as well as in assigning boundary conditions. However, the ARC2D model is most appropriate for attached and mildly separated boundary layers; no attempt is made to model wake regions and widely separated flows. The techniques have been successfully used for a variety of inviscid and viscous flowfield calculations. The Cray version of ARC2D is written in FORTRAN 77 for use on Cray series computers and requires approximately 5Mb memory. The program is fully vectorized. The tape includes variations for the COS and UNICOS operating systems. Also included is a sample routine for CONVEX computers to emulate Cray system time calls, which should be easy to modify for other machines as well. The standard distribution media for this version is a 9-track 1600 BPI ASCII Card Image format magnetic tape. The Cray version was developed in 1987. The IBM ES/3090 version is an IBM port of the Cray version. It is written in IBM VS FORTRAN and has the capability of executing in both vector and parallel modes on the MVS/XA operating system and in vector mode on the VM/XA operating system. Various options of the IBM VS FORTRAN compiler provide new features for the ES/3090 version, including 64-bit arithmetic and up to 2 GB of virtual addressability. The IBM ES/3090 version is available only as a 9-track, 1600 BPI IBM IEBCOPY format magnetic tape. The IBM ES/3090 version was developed in 1989. The DEC RISC ULTRIX version is a DEC port of the Cray version. It is written in FORTRAN 77 for RISC-based Digital Equipment platforms. The memory requirement is approximately 7Mb of main memory. It is available in UNIX tar format on TK50 tape cartridge. The port to DEC RISC ULTRIX was done in 1990. COS and UNICOS are trademarks and Cray is a registered trademark of Cray Research, Inc. IBM, ES/3090, VS FORTRAN, MVS/XA, and VM/XA are registered trademarks of International Business Machines. DEC and ULTRIX are registered trademarks of Digital Equipment Corporation.

  19. Open-Source ERP: Is It Ripe for Use in Teaching Supply Chain Management?

    ERIC Educational Resources Information Center

    Huynh, Minh Q.; Chu, Hung W.

    2011-01-01

    The field of supply chain management has changed greatly and rapidly. With the advent of enterprise systems, supply chains are now operating with up-to-the-minute information. The value of the information flow is marked by speed, accessibility, accuracy, and most of all relevancy. As it continually evolves, the supply chain management curriculum…

  20. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ainsworth, Nathan; Heaps, Colton; Symko-Davies, Martha

    The purpose of this report is to propose a technical roadmap for power supply technology to power the Tactical Assault Light Operator Suit (TALOS), an armored, powered exoskeleton currently in development for U.S. Special Operations Command operators. TALOS' power supply system must meet size targets similar to the size of a large backpack while providing significant electrical power for an entire mission cycle without resupply. This report proposes a staged development path based on three fundamental technical approaches.

  1. L-Band High Power Amplifiers for CEBAF Linac

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Fugitt, Jock; Killion, Richard; Nelson, Richard

    1990-09-01

    The high power portion of the CEBAF RF system utilizes 340 5kW klystrons providing 339 separately controlled outputs. Modulating anodes have been included in the klystron design to provide for economically efficient operation. The design includes shunt regulator-type modulating anode power supplies running from the cathode power supply, and switching filament power supplies. Remotely programmable filament voltage allows maximum cathode life to be realized. Klystron operating setpoint and fast klystron protection logic are provided by individual external CEBAF RF control modules. A single cathode power supply powers a block of eight klystrons. The design includes circulators and custom extrusion andmore » hybrid waveguide components which have allowed reduced physical size and lower cost in the design of the WR-650 waveguide transmission system.« less

  2. Innovative Tools for Water Quality/Quantity Management: New York City's Operations Support Tool

    NASA Astrophysics Data System (ADS)

    Wang, L.; Schaake, J. C.; Day, G. N.; Porter, J.; Sheer, D. P.; Pyke, G.

    2011-12-01

    The New York City Department of Environmental Protection (DEP) manages New York City's water supply, which is comprised of over 20 reservoirs and supplies more than 1 billion gallons of water per day to over 9 million customers. Recently, DEP has initiated design of an Operations Support Tool (OST), a state-of-the-art decision support system to provide computational and predictive support for water supply operations and planning. This presentation describes the technical structure of OST, including the underlying water supply and water quality models, data sources and database management, reservoir inflow forecasts, and the functionalities required to meet the needs of a diverse group of end users. OST is a major upgrade of DEP's current water supply - water quality model, developed to evaluate alternatives for controlling turbidity in NYC's Catskill reservoirs. While the current model relies on historical hydrologic and meteorological data, OST can be driven by forecasted future conditions. It will receive a variety of near-real-time data from a number of sources. OST will support two major types of simulations: long-term, for evaluating policy or infrastructure changes over an extended period of time; and short-term "position analysis" (PA) simulations, consisting of multiple short simulations, all starting from the same initial conditions. Typically, the starting conditions for a PA run will represent those for the current day and traces of forecasted hydrology will drive the model for the duration of the simulation period. The result of these simulations will be a distribution of future system states based on system operating rules and the range of input ensemble streamflow predictions. DEP managers will analyze the output distributions and make operation decisions using risk-based metrics such as probability of refill. Currently, in the developmental stages of OST, forecasts are based on antecedent hydrologic conditions and are statistical in nature. The statistical algorithm is a relatively simple and versatile, but lacks short-term skill critical for water quality and spill management. To improve short-term skill, OST will ultimately operate with meteorologically driven hydrologic forecasts provided by the National Weather Service (NWS). OST functionalities will support a wide range of DEP uses, including short term operational projections, outage planning and emergency management, operating rule development, and water supply planning. A core use of OST will be to inform reservoir management strategies to control and mitigate turbidity events while ensuring water supply reliability. OST will also allow DEP to manage its complex reservoir system to meet multiple objectives, including ecological flows, tailwater fisheries and recreational releases, and peak flow mitigation for downstream communities.

  3. Geothermal Power Supply Systems around the World and in Russia: State of the Art and Future Prospects

    NASA Astrophysics Data System (ADS)

    Butuzov, V. A.; Amerkhanov, R. A.; Grigorash, O. V.

    2018-05-01

    Solar and geothermal energy systems are shown to have received the widest use among all kinds of renewable sources of energy for heat supply purposes around the world. The power capacities and amounts of thermal energy generated by solar and geothermal heat supply systems around the world are presented by way of comparison. The thermal power capacity of solar heat supply systems installed around the world as of 2015 totaled 268.1 GW, and the thermal energy generated by them amounted to 225 TW h/year. The thermal power capacity of geothermal heat supply systems installed around the world totaled 70.3 GW, and the thermal energy generated by them amounted to 163 TW h/year. Information on the geothermal heat supply systems in the leading countries around the world based on the data reported at the World Geothermal Congress held in 2015 is presented. It is shown that China, with the installed thermal power capacities of its geothermal heat supply stations totaling 17.87 GW and the amount of thermal energy generated per annum equal to 48.435 TW h/year, is the world's leader in this respect. The structures of geothermal heat supply systems by the kinds of heat consumption used around the world are presented. The systems equipped with geothermal heat pumps accounted for 70.95% in the total installed capacity and for 55.3% in the total amount of generated heat. For systems that do not use heat pumps, those serving for pools account for the largest share amounting to 44.74% in installed capacity and to 45.43% in generated heat. A total of 2218 geothermal wells with the total length equal to 9534 km (with 38.7% of them for heat supply purposes) were drilled in 42 countries in the period from 2010 to 2014. In Russia, geothermal heat supply systems are in operation mainly in Dagestan, in Krasnodar krai, and in Kamchatka. The majority of these systems have been made without breaking the stream after the well outlet. A cyclic control arrangement is also used. The combined geothermal and solar heat supply system with an installed thermal power capacity of 5 MW that is in operation in the Rozovyi settlement, Krasnodar krai, is described. In the summer time, the solar installation with a capacity of 115 kW is used for supplying hot water to residential houses and for restoring the geothermal well pore pressure. The basic process circuit and characteristics of the geothermal heat supply system with the installed thermal power capacity of 8.7 MW operating in the Khankala settlement, the city of Groznyi, are given. The specific feature of this system is that the spent geothermal heat carrier is reinjected into a specially drilled inclined well. Advanced geothermal heat supply technologies involving reinjection of the spent geothermal heat carrier, combination with binary power units, use of heat pumps for recovering the spent heat carrier, and protection of equipment from corrosion and deposits are proposed.

  4. Film processing investigation. [improved chemical mixing system

    NASA Technical Reports Server (NTRS)

    Kelly, J. L.

    1972-01-01

    The present operational chemical mixing system for the Photographic Technology Division is evaluated, and the limitations are defined in terms of meeting the present and programmed chemical supply and delivery requirements. A major redesign of the entire chemical mixing, storage, analysis, and supply system is recommended. Other requirements for immediate and future implementations are presented.

  5. Light Armored Reconnaissance: Misunderstood and Underemployed in Deep Operations

    DTIC Science & Technology

    2010-04-01

    then CoB 2na LA! Bn deploys in support of Operation NIMROD DANCER in Panama Dec 1989 Co D, 2d LA! Bn deploys in support of Operation JUST CAUSE in...Marine Corns Long- Range Plan (MLRP) and U.S. Marine Corps Mid-Range Plan (MMRP). An analysis of the threat discussed in these documents reveals

  6. Research on the performance evaluation of agricultural products supply chain integrated operation

    NASA Astrophysics Data System (ADS)

    Jiang, Jiake; Wang, Xifu; Liu, Yang

    2017-04-01

    The agricultural product supply chain integrated operation can ensure the quality and efficiency of agricultural products, and achieve the optimal goal of low cost and high service. This paper establishes a performance evaluation index system of agricultural products supply chain integration operation based on the development status of agricultural products and SCOR, BSC and KPI model. And then, we constructing rough set theory and BP neural network comprehensive evaluation model with the aid of Rosetta and MATLAB tools and the case study is about the development of agricultural products integrated supply chain in Jing-Jin-Ji region. And finally, we obtain the corresponding performance results, and give some improvement measures and management recommendations to the managers.

  7. Definition and means of maintaining the supply ventilation system seismic shutdown portion of the PFP safety envelope

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Keck, R.D.

    1997-01-21

    The purpose of this document is to record the technical evaluation of the Limiting Condition for Operation (LCO) described in the Plutonium Finishing Plant (PFP) Operational Safety Requirements, WHC-SD-CP-OSR- 010, Rev. 0. Kay 1994, Section 3.2.3, `Supply Ventilation System Seismic Shutdown.` This document, with its appendices, provides the following: 1. The system functional requirements for determining system operability (Section 3). 2. Evaluations of equipment to determine the safety boundary for the system (Section 4). 3. A list of annotated drawings which show the safety envelope boundaries (Appendix C). 4. A list of the safety envelope equipment (Appendix B). 5. Functionalmore » requirements for the individual safety envelope equipment, including appropriate setpoints and process parameters (Section 4.1). 6. A list of the operational, maintenance and surveillance procedures necessary to operate and maintain the system equipment within the safety envelope (Sections 5 and 6 and Appendix A).« less

  8. Multicriteria hierarchical iterative interactive algorithm for organizing operational modes of large heat supply systems

    NASA Astrophysics Data System (ADS)

    Korotkova, T. I.; Popova, V. I.

    2017-11-01

    The generalized mathematical model of decision-making in the problem of planning and mode selection providing required heat loads in a large heat supply system is considered. The system is multilevel, decomposed into levels of main and distribution heating networks with intermediate control stages. Evaluation of the effectiveness, reliability and safety of such a complex system is carried out immediately according to several indicators, in particular pressure, flow, temperature. This global multicriteria optimization problem with constraints is decomposed into a number of local optimization problems and the coordination problem. An agreed solution of local problems provides a solution to the global multicriterion problem of decision making in a complex system. The choice of the optimum operational mode of operation of a complex heat supply system is made on the basis of the iterative coordination process, which converges to the coordinated solution of local optimization tasks. The interactive principle of multicriteria task decision-making includes, in particular, periodic adjustment adjustments, if necessary, guaranteeing optimal safety, reliability and efficiency of the system as a whole in the process of operation. The degree of accuracy of the solution, for example, the degree of deviation of the internal air temperature from the required value, can also be changed interactively. This allows to carry out adjustment activities in the best way and to improve the quality of heat supply to consumers. At the same time, an energy-saving task is being solved to determine the minimum required values of heads at sources and pumping stations.

  9. VTGRAPH - GRAPHIC SOFTWARE TOOL FOR VT TERMINALS

    NASA Technical Reports Server (NTRS)

    Wang, C.

    1994-01-01

    VTGRAPH is a graphics software tool for DEC/VT or VT compatible terminals which are widely used by government and industry. It is a FORTRAN or C-language callable library designed to allow the user to deal with many computer environments which use VT terminals for window management and graphic systems. It also provides a PLOT10-like package plus color or shade capability for VT240, VT241, and VT300 terminals. The program is transportable to many different computers which use VT terminals. With this graphics package, the user can easily design more friendly user interface programs and design PLOT10 programs on VT terminals with different computer systems. VTGRAPH was developed using the ReGis Graphics set which provides a full range of graphics capabilities. The basic VTGRAPH capabilities are as follows: window management, PLOT10 compatible drawing, generic program routines for two and three dimensional plotting, and color graphics or shaded graphics capability. The program was developed in VAX FORTRAN in 1988. VTGRAPH requires a ReGis graphics set terminal and a FORTRAN compiler. The program has been run on a DEC MicroVAX 3600 series computer operating under VMS 5.0, and has a virtual memory requirement of 5KB.

  10. Akeno 20 km (2) air shower array (Akeno Branch)

    NASA Technical Reports Server (NTRS)

    Teshima, M.; Ohoka, H.; Matsubara, Y.; Hara, T.; Hatano, Y.; Hayashida, N.; He, C. X.; Honda, M.; Ishikawa, F.; Kamata, K.

    1985-01-01

    As the first stage of the future huge array, the Akeno air shower array was expanded to about 20 sq. km. by adding 19 scintillation detectors of 2.25 sq m area outside the present 1 sq. km. Akeno array with a new data collection system. These detectors are spaced about 1km from each other and connected by two optical fiber cables. This array has been in partial operation from 8th, Sep. 1984 and full operation from 20th, Dec. 1984. 20 sq m muon stations are planned to be set with 2km separation and one of them is now under construction. The origin of the highest energy cosmic rays is studied.

  11. Preliminary design of a mobile lunar power supply

    NASA Technical Reports Server (NTRS)

    Schmitz, Paul C.; Kenny, Barbara H.; Fulmer, Christopher R.

    1991-01-01

    A preliminary design for a Stirling isotope power system for use as a mobile lunar power supply is presented. Performance and mass of the components required for the system are estimated. These estimates are based on power requirements and the operating environment. Optimizations routines are used to determine minimum mass operational points. Shielding for the isotope system are given as a function of the allowed dose, distance from the source, and the time spent near the source. The technologies used in the power conversion and radiator systems are taken from ongoing research in the Civil Space Technology Initiative (CSTI) program.

  12. Electrolytes for Li-Ion Cells in Low Temperature Applications

    NASA Technical Reports Server (NTRS)

    Smart, M. C.; Ratnakumar, B. V.; Surampudi, S.

    2000-01-01

    Prototype AA-size lithium-ion cells have been demonstrated to operate effectively at temperatures as low as -30 to -40 C. These improvements in low temperature cell performance have been realized by the incorporation of ethylene carbonate-based electrolytes which possess low melting, low viscosity cosolvents, such as methyl acetate, ethyl acetate, gamma-butyrolactone, and ethyl methyl carbonate. The cells containing a 0.75M LiPF6 EC+DEC+DMC+EMC (1:1:1:1) electrolyte displayed the best performance at -30 C (> 90% of the room temperature capacity at approximately C/15 rate), whereas, at -40 C the cells with the 0.75M LiPF6 EC+DEC+DMC+MA (1:1:1:1) and 0.75M LiPF6 EC+DEC+DMC+EA (1:1:1:1) electrolytes showed superior performance.

  13. Using SCOR as a Supply Chain Management Framework for Government Agency Contract Requirements

    NASA Technical Reports Server (NTRS)

    Paxton, Joe

    2010-01-01

    Enterprise Supply Chain Management consists of: Specifying suppliers to support inter-program and inter-agency efforts. Optimizing inventory levels and locations throughout the supply chain. Executing corrective actions to improve quality and lead time issues throughout the supply chain. Processing reported data to calculate and make visible supply chain performance (provide information for decisions and actions). Ensuring the right hardware and information is provided at the right time and in the right place. Monitoring the industrial base while developing, producing, operating and retiring a system. Seeing performance deep in the supply chain that could indicate issues affecting system availability and readiness.

  14. Demographic indicators of change in a deposit-feeding abyssal holothurian community (Station M, 4000 m)

    NASA Astrophysics Data System (ADS)

    Huffard, Christine L.; Kuhnz, Linda A.; Lemon, Larissa; Sherman, Alana D.; Smith, Kenneth L.

    2016-03-01

    Holothurians are among the most abundant benthic megafauna at abyssal depths, and important consumers and bioturbators of organic carbon on the sea floor. Significant fluctuations in abyssal holothurian density are often attributed to species-specific responses to variable particulate organic carbon flux (food supply) stemming from surface ocean events. We report changes in densities of 19 holothurian species at the abyssal monitoring site Station M in the northeast Pacific, recorded during 11 remotely operated vehicle surveys between Dec 2006 and Oct 2014. Body size demographics are presented for Abyssocucumis abyssorum, Synallactidae sp. 1, Paelopatides confundens, Elpidia sp. A, Peniagone gracilis, Peniagone papillata, Peniagone vitrea, Peniagone sp. A, Peniagone sp. 1, and Scotoplanes globosa. Densities were lower and species evenness was higher from 2006-2009 compared to 2011-2014. Food supply of freshly-settled phytodetritus was exceptionally high during this latter period. Based on relationships between median body length and density, numerous immigration and juvenile recruitment events of multiple species appeared to take place between 2011 and 2014. These patterns were dominated by elpidiids (Holothuroidea: Elasipodida: Elpidiidae), which consistently increased in density during a period of high food availability, while other groups showed inconsistent responses. We considered minimum body length to be a proxy for size at juvenile recruitment. Patterns in density clustered by this measure, which was a stronger predictor of maximum density than median and mean body length.

  15. Engine and method for operating an engine

    DOEpatents

    Lauper, Jr., John Christian; Willi, Martin Leo [Dunlap, IL; Thirunavukarasu, Balamurugesh [Peoria, IL; Gong, Weidong [Dunlap, IL

    2008-12-23

    A method of operating an engine is provided. The method may include supplying a combustible combination of reactants to a combustion chamber of the engine, which may include supplying a first hydrocarbon fuel, hydrogen fuel, and a second hydrocarbon fuel to the combustion chamber. Supplying the second hydrocarbon fuel to the combustion chamber may include at least one of supplying at least a portion of the second hydrocarbon fuel from an outlet port that discharges into an intake system of the engine and supplying at least a portion of the second hydrocarbon fuel from an outlet port that discharges into the combustion chamber. Additionally, the method may include combusting the combustible combination of reactants in the combustion chamber.

  16. Distributed situation awareness in complex collaborative systems: A field study of bridge operations on platform supply vessels.

    PubMed

    Sandhåland, Hilde; Oltedal, Helle A; Hystad, Sigurd W; Eid, Jarle

    2015-06-01

    This study provides empirical data about shipboard practices in bridge operations on board a selection of platform supply vessels (PSVs). Using the theoretical concept of distributed situation awareness, the study examines how situation awareness (SA)-related information is distributed and coordinated at the bridge. This study thus favours a systems approach to studying SA, viewing it not as a phenomenon that solely happens in each individual's mind but rather as something that happens between individuals and the tools that they use in a collaborative system. Thus, this study adds to our understanding of SA as a distributed phenomenon. Data were collected in four field studies that lasted between 8 and 14 days on PSVs that operate on the Norwegian continental shelf and UK continental shelf. The study revealed pronounced variations in shipboard practices regarding how the bridge team attended to operational planning, communication procedures, and distracting/interrupting factors during operations. These findings shed new light on how SA might decrease in bridge teams during platform supply operations. The findings from this study emphasize the need to assess and establish shipboard practices that support the bridge teams' SA needs in day-to-day operations. Provides insights into how shipboard practices that are relevant to planning, communication and the occurrence of distracting/interrupting factors are realized in bridge operations.Notes possible areas for improvement to enhance distributed SA in bridge operations.

  17. [The development of hospital medical supplies information management system].

    PubMed

    Cao, Shaoping; Gu, Hongqing; Zhang, Peng; Wang, Qiang

    2010-05-01

    The information management of medical materials by using high-tech computer, in order to improve the efficiency of the consumption of medical supplies, hospital supplies and develop a new technology way to manage the hospital and material support. Using C # NET, JAVA techniques to develop procedures for the establishment of hospital material management information system, set the various management modules, production of various statistical reports, standard operating procedures. The system is convenient, functional and strong, fluent statistical functions. It can always fully grasp and understand the whole hospital supplies run dynamic information, as a modern and effective tool for hospital materials management.

  18. 14 CFR 23.959 - Unusable fuel supply.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... STANDARDS: NORMAL, UTILITY, ACROBATIC, AND COMMUTER CATEGORY AIRPLANES Powerplant Fuel System § 23.959... occurring under each intended operation and flight maneuver involving that tank. Fuel system component... 14 Aeronautics and Space 1 2010-01-01 2010-01-01 false Unusable fuel supply. 23.959 Section 23.959...

  19. 14 CFR 23.959 - Unusable fuel supply.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... STANDARDS: NORMAL, UTILITY, ACROBATIC, AND COMMUTER CATEGORY AIRPLANES Powerplant Fuel System § 23.959... occurring under each intended operation and flight maneuver involving that tank. Fuel system component... 14 Aeronautics and Space 1 2013-01-01 2013-01-01 false Unusable fuel supply. 23.959 Section 23.959...

  20. 14 CFR 23.959 - Unusable fuel supply.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... STANDARDS: NORMAL, UTILITY, ACROBATIC, AND COMMUTER CATEGORY AIRPLANES Powerplant Fuel System § 23.959... occurring under each intended operation and flight maneuver involving that tank. Fuel system component... 14 Aeronautics and Space 1 2014-01-01 2014-01-01 false Unusable fuel supply. 23.959 Section 23.959...

  1. 14 CFR 23.959 - Unusable fuel supply.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... STANDARDS: NORMAL, UTILITY, ACROBATIC, AND COMMUTER CATEGORY AIRPLANES Powerplant Fuel System § 23.959... occurring under each intended operation and flight maneuver involving that tank. Fuel system component... 14 Aeronautics and Space 1 2011-01-01 2011-01-01 false Unusable fuel supply. 23.959 Section 23.959...

  2. 14 CFR 23.959 - Unusable fuel supply.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... STANDARDS: NORMAL, UTILITY, ACROBATIC, AND COMMUTER CATEGORY AIRPLANES Powerplant Fuel System § 23.959... occurring under each intended operation and flight maneuver involving that tank. Fuel system component... 14 Aeronautics and Space 1 2012-01-01 2012-01-01 false Unusable fuel supply. 23.959 Section 23.959...

  3. Design and Experimental Verification of a 0.19 V 53 μW 65 nm CMOS Integrated Supply-Sensing Sensor With a Supply-Insensitive Temperature Sensor and an Inductive-Coupling Transmitter for a Self-Powered Bio-sensing System Using a Biofuel Cell.

    PubMed

    Kobayashi, Atsuki; Ikeda, Kei; Ogawa, Yudai; Kai, Hiroyuki; Nishizawa, Matsuhiko; Nakazato, Kazuo; Niitsu, Kiichi

    2017-12-01

    In this paper, we present a self-powered bio-sensing system with the capability of proximity inductive-coupling communication for supply sensing and temperature monitoring. The proposed bio-sensing system includes a biofuel cell as a power source and a sensing frontend that is associated with the CMOS integrated supply-sensing sensor. The sensor consists of a digital-based gate leakage timer, a supply-insensitive time-domain temperature sensor, and a current-driven inductive-coupling transmitter and achieves low-voltage operation. The timer converts the output voltage from a biofuel cell to frequency. The temperature sensor provides a pulse width modulation (PWM) output that is not dependent on the supply voltage, and the associated inductive-coupling transmitter enables proximity communication. A test chip was fabricated in 65 nm CMOS technology and consumed 53 μW with a supply voltage of 190 mV. The low-voltage-friendly design satisfied the performance targets of each integrated sensor without any trimming. The chips allowed us to successfully demonstrate proximity communication with an asynchronous receiver, and the measurement results show the potential for self-powered operation using biofuel cells. The analysis and experimental verification of the system confirmed their robustness.

  4. A Micro grid design for a kind of household energy efficiency management system based on high permeability

    NASA Astrophysics Data System (ADS)

    Li, Siwei; Li, Jun; Liu, Zhuochu; Wang, Min; Yue, Liang

    2017-05-01

    After the access of household distributed photovoltaic, conditions of high permeability generally occur, which cut off the connection between distributed power supply and major network rapidly and use energy storage device to realize electrical energy storage. The above operations cannot be adequate for the power grid health after distributed power supply access any more from the perspective of economy and rationality. This paper uses the integration between device and device, integration between device and system and integration between system and system of household microgrid and household energy efficiency management, to design household microgrid building program and operation strategy containing household energy efficiency management, to achieve efficient integration of household energy efficiency management and household microgrid, to effectively solve problems of high permeability of household distributed power supply and so on.

  5. Application analysis of solar total energy systems to the residential sector. Volume III, conceptual design. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1979-07-01

    The objective of the work described in this volume was to conceptualize suitable designs for solar total energy systems for the following residential market segments: single-family detached homes, single-family attached units (townhouses), low-rise apartments, and high-rise apartments. Conceptual designs for the total energy systems are based on parabolic trough collectors in conjunction with a 100 kWe organic Rankine cycle heat engine or a flat-plate, water-cooled photovoltaic array. The ORC-based systems are designed to operate as either independent (stand alone) systems that burn fossil fuel for backup electricity or as systems that purchase electricity from a utility grid for electrical backup.more » The ORC designs are classified as (1) a high temperature system designed to operate at 600/sup 0/F and (2) a low temperature system designed to operate at 300/sup 0/F. The 600/sup 0/F ORC system that purchases grid electricity as backup utilizes the thermal tracking principle and the 300/sup 0/F ORC system tracks the combined thermal and electrical loads. Reject heat from the condenser supplies thermal energy for heating and cooling. All of the ORC systems utilize fossil fuel boilers to supply backup thermal energy to both the primary (electrical generating) cycle and the secondary (thermal) cycle. Space heating is supplied by a central hot water (hydronic) system and a central absorption chiller supplies the space cooling loads. A central hot water system supplies domestic hot water. The photovoltaic system uses a central electrical vapor compression air conditioning system for space cooling, with space heating and domestic hot water provided by reject heat from the water-cooled array. All of the systems incorporate low temperature thermal storage (based on water as the storage medium) and lead--acid battery storage for electricity; in addition, the 600/sup 0/F ORC system uses a therminol-rock high temperature storage for the primary cycle. (WHK)« less

  6. Magnetic susceptibility well-logging unit with single power supply thermoregulation system

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Seeley, R. L.

    1985-11-05

    The magnetic susceptibility well-logging unit with single power supply thermoregulation system provides power from a single surface power supply over a well-logging cable to an integrated circuit voltage regulator system downhole. This voltage regulator system supplies regulated voltages to a temperature control system and also to a Maxwell bridge sensing unit which includes the solenoid of a magnetic susceptibility probe. The temperature control system is provided with power from the voltage regulator system and operates to permit one of several predetermined temperatures to be chosen, and then operates to maintain the solenoid of a magnetic susceptibility probe at this chosenmore » temperature. The temperature control system responds to a temperature sensor mounted upon the probe solenoid to cause resistance heaters concentrically spaced from the probe solenoid to maintain the chosen temperature. A second temperature sensor on the probe solenoid provides a temperature signal to a temperature transmitting unit, which initially converts the sensed temperature to a representative voltage. This voltage is then converted to a representative current signal which is transmitted by current telemetry over the well logging cable to a surface electronic unit which then reconverts the current signal to a voltage signal.« less

  7. A phenomenological model for orificed hollow cathodes. Ph.D. Thesis, 1 Dec. 1981 - 1 Dec. 1982; [electrostatic thruster

    NASA Technical Reports Server (NTRS)

    Siegfried, D. E.

    1982-01-01

    A quartz hollow tube cathode was used to determine the operating conditions within a mercury orificed hollow cathode. Insert temperature profiles, cathode current distributions, plasma properties profile, and internal pressure-mass flow rate results are summarized and used in a phenomenological model which qualitatively describes electron emission and plasma production processes taking place within the cathode. By defining an idealized ion production region within which most of the plasma processes are concentrated, this model is expressed analytically as a simple set of equations which relate cathode dimensions and specifiable operating conditions, such as mass flow rate and discharge current, to such important parameters as emission surface temperature and internal plasma properties. Key aspects of the model are examined.

  8. Modeling methodology for supply chain synthesis and disruption analysis

    NASA Astrophysics Data System (ADS)

    Wu, Teresa; Blackhurst, Jennifer

    2004-11-01

    The concept of an integrated or synthesized supply chain is a strategy for managing today's globalized and customer driven supply chains in order to better meet customer demands. Synthesizing individual entities into an integrated supply chain can be a challenging task due to a variety of factors including conflicting objectives, mismatched incentives and constraints of the individual entities. Furthermore, understanding the effects of disruptions occurring at any point in the system is difficult when working toward synthesizing supply chain operations. Therefore, the goal of this research is to present a modeling methodology to manage the synthesis of a supply chain by linking hierarchical levels of the system and to model and analyze disruptions in the integrated supply chain. The contribution of this research is threefold: (1) supply chain systems can be modeled hierarchically (2) the performance of synthesized supply chain system can be evaluated quantitatively (3) reachability analysis is used to evaluate the system performance and verify whether a specific state is reachable, allowing the user to understand the extent of effects of a disruption.

  9. Survey of flue gas desulfurization systems: Duck Creek Station, Central Illinois Light Co. Final report, Jul-Dec 1978

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Laseke, B.A. Jr.

    The report presents the results of a survey of operational flue gas desulfurization (FGD) systems on coal-fired utility boilers in the United States. The FGD system installed on Unit 1 at the Duck Creek Station of Central Illinois Light Company is described in terms of design and performance. The system consists of four parallel, wet-limestone, rod-deck scrubber modules designed for 25% capacity each, providing a total sulfur dioxide removal efficiency of 85%. The bottom ash, fly ash, and scrubbing wastes are disposed of in a sludge pond lined with a natural impermeable material. The first module of this four modulemore » FGD system was placed in service on July 1, 1976, and operated intermittently throughout the remainder of the year and for approximately one month in early 1977. On July 23, 1978, the three remaining modules were completed and all four modules were placed in the gas path for treatment of high sulfur flue gas.« less

  10. Nuclear Engine System Simulation (NESS). Version 2.0: Program user's guide

    NASA Technical Reports Server (NTRS)

    Pelaccio, Dennis G.; Scheil, Christine M.; Petrosky, Lyman

    1993-01-01

    This Program User's Guide discusses the Nuclear Thermal Propulsion (NTP) engine system design features and capabilities modeled in the Nuclear Engine System Simulation (NESS): Version 2.0 program (referred to as NESS throughout the remainder of this document), as well as its operation. NESS was upgraded to include many new modeling capabilities not available in the original version delivered to NASA LeRC in Dec. 1991, NESS's new features include the following: (1) an improved input format; (2) an advanced solid-core NERVA-type reactor system model (ENABLER 2); (3) a bleed-cycle engine system option; (4) an axial-turbopump design option; (5) an automated pump-out turbopump assembly sizing option; (6) an off-design gas generator engine cycle design option; (7) updated hydrogen properties; (8) an improved output format; and (9) personal computer operation capability. Sample design cases are presented in the user's guide that demonstrate many of the new features associated with this upgraded version of NESS, as well as design modeling features associated with the original version of NESS.

  11. Solar energy system performance evaluation-seasonal report for Elcam San Diego, San Diego, California

    NASA Technical Reports Server (NTRS)

    1980-01-01

    The solar energy system, Elcam San Diego, was designed to supply domestic hot water heating for a single family residence located in Encinitas, California. System description, performance assessment, operating energy, energy savings, maintenance, and conclusions are presented. The system is a 'Sunspot' two tank cascade type, where solar energy is supplied to either a 66 gallon preheat tank (solar storage) or a 40 gallon domestic hot water tank. Water is pumped directly from one of the two tanks, through the 65 square feet collector array and back into the same tank. Freeze protection is provided by automatically circulating hot water from the hot water tank through the collectors and exposed plumbing when freezing conditions exist. Auxiliary energy is supplied by natural gas. Analysis is based on instrumented system data monitored and collected for one full season of operation.

  12. Design of Instantaneous High Power Supply System with power distribution management for portable military devices

    NASA Astrophysics Data System (ADS)

    Kwak, Kiho; Kwak, Dongmin; Yoon, Joohong

    2015-08-01

    A design of an Instantaneous High Power Supply System (IHPSS) with a power distribution management (PDM) for portable military devices is newly addressed. The system includes a power board and a hybrid battery that can not only supply instantaneous high power but also maintain stable operation at critical low temperature (-30 °C). The power leakage and battery overcharge are effectively prevented by the optimal PDM. The performance of the proposed system under the required pulse loads and the operating conditions of a Korean Advanced Combat Rifle employed in the battlefield is modeled with simulations and verified experimentally. The system with the IHPSS charged the fuse setter with 1.7 times higher voltage (8.6 V) than the one without (5.4 V) under the pulse discharging rate (1 A at 0.5 duty, 1 ms) for 500 ms.

  13. Potable water supply in U.S. manned space missions

    NASA Technical Reports Server (NTRS)

    Sauer, Richard L.; Straub, John E., II

    1992-01-01

    A historical review of potable water supply systems used in the U.S. manned flight program is presented. This review provides a general understanding of the unusual challenges these systems have presented to the designers and operators of the related flight hardware. The presentation concludes with the projection of how water supply should be provided in future space missions - extended duration earth-orbital and interplanetary missions and lunar and Mars habitation bases - and the challenges to the biomedical community that providing these systems can present.

  14. ORION Media Event at LASF

    NASA Image and Video Library

    2014-12-19

    NASA's Orion spacecraft is viewed by members of the media at the Launch Abort System Facility at NASA's Kennedy Space Center in Florida. Lou Garcia, with the Ground Systems Development and Operations Program, or GSDO, speaks to the media during the viewing opportunity. The spacecraft's cross-country return, a 2,700 mile road trip from Naval Base San Diego to Kennedy, sets the stage for in-depth analysis of data obtained during Orion's trip to space. It will provide engineers with detailed information on how the spacecraft fared during its two-orbit, 4.5-hour flight test, completed on Dec. 5. GSDO led the recovery, offload and transportation efforts.

  15. KSC-2014-4864

    NASA Image and Video Library

    2014-12-19

    CAPE CANAVERAL, Fla. -- NASA's Orion spacecraft is viewed by members of the media at the Launch Abort System Facility at NASA's Kennedy Space Center in Florida. Kennedy News Chief Mike Curie speaks to the media during the viewing opportunity. Orion made the 8-day, 2,700 mile overland trip back to Kennedy from Naval Base San Diego in California. Analysis of data obtained during its two-orbit, four-and-a-half hour mission Dec. 5 will provide engineers detailed information on how the spacecraft fared. The Ground Systems Development and Operations Program led the recovery, offload and transportation efforts. For more information, visit www.nasa.gov/orion. Photo credit: NASA/Dimitri Gerondidakis

  16. ORION Media Event at LASF

    NASA Image and Video Library

    2014-12-19

    NASA's Orion spacecraft is viewed by members of the media at the Launch Abort System Facility at NASA's Kennedy Space Center in Florida. Kennedy's News Chief Mike Curie speaks to the media during the viewing opportunity. The spacecraft's cross-country return, a 2,700 mile road trip from Naval Base San Diego to Kennedy, sets the stage for in-depth analysis of data obtained during Orion's trip to space. It will provide engineers with detailed information on how the spacecraft fared during its two-orbit, 4.5-hour flight test, completed on Dec. 5. The Ground Systems Development and Operations Program led the recovery, offload and transportation efforts.

  17. KSC-2014-4881

    NASA Image and Video Library

    2014-12-19

    CAPE CANAVERAL, Fla. -- NASA's Orion spacecraft is viewed by members of the media at the Launch Abort System Facility at NASA's Kennedy Space Center in Florida. Kennedy News Chief Mike Curie speaks to the media during the viewing opportunity. Orion made the 8-day, 2,700 mile overland trip back to Kennedy from Naval Base San Diego in California. Analysis of date obtained during its two-orbit, four-and-a-half hour mission Dec. 5 will provide engineers with detailed information on how the spacecraft fared. The Ground Systems Development and Operations Program led the recovery, offload and transportation efforts. For more information, visit www.nasa.gov/orion. Photo credit: NASA/Dimitri Gerondidakis

  18. STGT program: Ada coding and architecture lessons learned

    NASA Technical Reports Server (NTRS)

    Usavage, Paul; Nagurney, Don

    1992-01-01

    STGT (Second TDRSS Ground Terminal) is currently halfway through the System Integration Test phase (Level 4 Testing). To date, many software architecture and Ada language issues have been encountered and solved. This paper, which is the transcript of a presentation at the 3 Dec. meeting, attempts to define these lessons plus others learned regarding software project management and risk management issues, training, performance, reuse, and reliability. Observations are included regarding the use of particular Ada coding constructs, software architecture trade-offs during the prototyping, development and testing stages of the project, and dangers inherent in parallel or concurrent systems, software, hardware, and operations engineering.

  19. Orion Flight Test Preview Briefing

    NASA Image and Video Library

    2014-11-06

    In the Kennedy Space Center’s Press Site auditorium, members of the news media are briefed on the upcoming Orion flight test by Jeremy Graeber, Orion Recovery Director in Ground Systems Development and Operations at Kennedy. Orion is the exploration spacecraft designed to carry astronauts to destinations not yet explored by humans, including an asteroid and Mars. It will have emergency abort capability, sustain the crew during space travel and provide safe re-entry from deep space return velocities. The first unpiloted flight test of Orion is scheduled to launch Dec. 4, 2014 atop a United Launch Alliance Delta IV Heavy rocket, and in 2018 on NASA’s Space Launch System rocket.

  20. Exploring the Dynamics and Modeling National Budget as a Supply Chain System: A Proposal for Reengineering the Budgeting Process and for Developing a Management Flight Simulator

    DTIC Science & Technology

    2012-09-01

    Elmendorf, D. W., & Gregory Mankiw , N. (1999). Government debt. Handbook of Macroeconomics , 1, 1615-1669. European Union. European financial stability...budget process, based on the supply chain demand management process principles of operations and it is introduced the idea of developing a Budget... principles of systems dynamics, a proposal for the development of a Budget Management Flight Simulator, that will operate as a learning and educational

  1. Status of the Superconducting Insertion Device Control at TLS

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hu, K. H.; Wang, C. J.; Lee, Demi

    2007-01-19

    Superconducting insertion devices are installed at Taiwan Light Source to meet the rapidly growing demand of X-ray users. A control system supports the operation of all these superconducting insertion devices. Control system coordinates the operation of the main power supply and the trimming power supply to charge/discharge the magnet and provide essential interlock protection for the coils and vacuum ducts. Quench protection and various cryogenic interlocks are designed to prevent damage to the magnet. A friendly user interface supports routine operation. Various applications are also developed to aid the operation of these insertion devices. Design consideration and details of themore » implementation will be summarized in this report.« less

  2. Disabled personnel emergency-heating system. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Van Dine, N.

    1974-12-16

    This progress report describes a receiving well for the operating fuel supply (two provided) designed within the unit to permit parasitic heat loss from the system to be captured by the fuel supply. The Zero can housing provides adequate volume to accommodate stowage of the fluid-flow umbilicals for connection of the heater system to the tubulated casualty bag liner.

  3. 33 CFR 157.126 - Pumps.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Washing (COW) System on Tank Vessels Design, Equipment, and Installation § 157.126 Pumps. (a) Crude oil must be supplied to the COW machines by COW system pumps or cargo pumps. (b) The pumps under paragraph...) A sufficient pressure and flow is supplied to allow the simultaneous operation of those COW machines...

  4. On intra-supply chain system with an improved distribution plan, multiple sales locations and quality assurance.

    PubMed

    Chiu, Singa Wang; Huang, Chao-Chih; Chiang, Kuo-Wei; Wu, Mei-Fang

    2015-01-01

    Transnational companies, operating in extremely competitive global markets, always seek to lower different operating costs, such as inventory holding costs in their intra- supply chain system. This paper incorporates a cost reducing product distribution policy into an intra-supply chain system with multiple sales locations and quality assurance studied by [Chiu et al., Expert Syst Appl, 40:2669-2676, (2013)]. Under the proposed cost reducing distribution policy, an added initial delivery of end items is distributed to multiple sales locations to meet their demand during the production unit's uptime and rework time. After rework when the remaining production lot goes through quality assurance, n fixed quantity installments of finished items are then transported to sales locations at a fixed time interval. Mathematical modeling and optimization techniques are used to derive closed-form optimal operating policies for the proposed system. Furthermore, the study demonstrates significant savings in stock holding costs for both the production unit and sales locations. Alternative of outsourcing product delivery task to an external distributor is analyzed to assist managerial decision making in potential outsourcing issues in order to facilitate further reduction in operating costs.

  5. 49 CFR 393.23 - Power supply for lamps.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... NECESSARY FOR SAFE OPERATION Lamps, Reflective Devices, and Electrical Wiring § 393.23 Power supply for lamps. All required lamps must be powered by the electrical system of the motor vehicle with the...

  6. Orion is Taken From Ship & Put in Shipping Container

    NASA Image and Video Library

    2014-12-10

    The Orion crew module is being lowered onto the crew module transportation fixture at the Mole Pier at Naval Base San Diego in California. The fixture has been secured on the back of a flatbed truck. Orion is being prepared for the overland trip back to NASA's Kennedy Space Center in Florida. Orion was recovered from the Pacific Ocean after completing a two-orbit, four-and-a-half hour mission Dec. 5 to test systems critical to crew safety, including the launch abort system, the heat shield and the parachute system. NASA, the U.S. Navy and Lockheed Martin coordinated efforts to recover Orion. The Ground Systems Development and Operations Program led the recovery, offload and pre-transportation efforts.

  7. 78 FR 23920 - Application for New Awards; Education Research and Special Education Research Grant Programs

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-23

    ... Act of 2002. The Institute's purpose in awarding these grants is to provide national leadership in...: Policies, Organization, Management, and Leadership Mathematics and Science Education Postsecondary and......... [dec222] Improving Education Systems: Policies, Organization, Management, and Leadership. [dec222...

  8. Demonstration of a residential CHP system based on PEM fuel cells

    NASA Astrophysics Data System (ADS)

    Gigliucci, G.; Petruzzi, L.; Cerelli, E.; Garzisi, A.; La Mendola, A.

    Fuel cell-based CHP systems are very attractive for stationary energy generation, since they allow production of electricity and heat in a decentralised, quiet, efficient and environmentally friendly way. As a means of evaluating this new technology, Enel Produzione installed a beta-version fuel cell CHP system, supplied by H-Power, at its experimental area sited in Livorno (Italy), and submitted it to a series of tests. The system is a co-generative unit, converting natural gas into electricity and heat: the former is delivered to local loads using electric load following capability; the latter is delivered to the experimental area hydraulic refrigeration circuit. Experiments were aimed at assessing the suitability of this kind of system to supply Italian residential customers. Factors such as performances, flexibility and operational requirements were evaluated under all the possible operating conditions, both under grid connected and stand alone configurations. At the same time, a mathematical model of the FC/CHP unit was developed to allow for the prediction of system performances and operating parameters under off-design conditions. This model can be used as an effective tool to optimise system operation when a particular customer has to be supplied. Results show that the prototype behaved as expected by a first "proof of concept" system and outline improvements to be achieved in order to satisfy the energy needs of small residential applications.

  9. Cargo Movement Operations System (CMOS). Final Software Product Specification Increment 1

    DTIC Science & Technology

    1991-02-17

    NO ( ] COMMENT DISPOSITION: COMMENT STATUS: OPEN [ ] CLOSED [ ] ORIGINATOR CONTROL NUMBER: SPSl-0002 PROGRAM OFFICE CONTROL NUMBER: DATA ITEM DISCREPANCY WORKSHEET CDRI NUMBER: A014-02 DATE: 02/17/91 ORIGINATOR NAME: Vivian L. Martin OFFICE SYMBOL: SAIC TELEPHONE NUMBER: 272-2999 SUBSTANTIVE: X EDITORIAL: PAGE NUMBER: E-1 PARA NUMBER: 10. COMMENT OR RECOMMENDED CHANGE: Footnote the AUTOEXEC.BAT entry to indicate that it is identified as CUlAO001 in the SDD (20 Dec 90). RATIONALE: This will synchronize the SPS with the SDD. CMOS PMO ACCEPTS

  10. Data Integration: Charting a Path Forward to 2035

    DTIC Science & Technology

    2011-02-14

    New York, NY: Gotham Books, 2004. Seligman , Len. Mitre Corporation, e-mail interview, 6 Dec 2010. Singer, P.W. Wired for War: The Robotics...articles.aspx (accessed 4 Dec 2010). Ultra-Large-Scale Systems: The Software Challenge of the Future. Study lead Linda Northrup. Pittsburgh, PA: Carnegie...Virtualization?‖ 1. 41 Ultra-Large-Scale Systems: The Software Challenge of the Future. Study lead Linda Northrup. Pittsburgh, PA: Carnegie Mellon Software

  11. Optimal reconstruction of historical water supply to a distribution system: A. Methodology.

    PubMed

    Aral, M M; Guan, J; Maslia, M L; Sautner, J B; Gillig, R E; Reyes, J J; Williams, R C

    2004-09-01

    The New Jersey Department of Health and Senior Services (NJDHSS), with support from the Agency for Toxic Substances and Disease Registry (ATSDR) conducted an epidemiological study of childhood leukaemia and nervous system cancers that occurred in the period 1979 through 1996 in Dover Township, Ocean County, New Jersey. The epidemiological study explored a wide variety of possible risk factors, including environmental exposures. ATSDR and NJDHSS determined that completed human exposure pathways to groundwater contaminants occurred in the past through private and community water supplies (i.e. the water distribution system serving the area). To investigate this exposure, a model of the water distribution system was developed and calibrated through an extensive field investigation. The components of this water distribution system, such as number of pipes, number of tanks, and number of supply wells in the network, changed significantly over a 35-year period (1962--1996), the time frame established for the epidemiological study. Data on the historical management of this system was limited. Thus, it was necessary to investigate alternative ways to reconstruct the operation of the system and test the sensitivity of the system to various alternative operations. Manual reconstruction of the historical water supply to the system in order to provide this sensitivity analysis was time-consuming and labour intensive, given the complexity of the system and the time constraints imposed on the study. To address these issues, the problem was formulated as an optimization problem, where it was assumed that the water distribution system was operated in an optimum manner at all times to satisfy the constraints in the system. The solution to the optimization problem provided the historical water supply strategy in a consistent manner for each month of the study period. The non-uniqueness of the selected historical water supply strategy was addressed by the formulation of a second model, which was based on the first solution. Numerous other sensitivity analyses were also conducted using these two models. Both models are solved using a two-stage progressive optimality algorithm along with genetic algorithms (GAs) and the EPANET2 water distribution network solver. This process reduced the required solution time and generated a historically consistent water supply strategy for the water distribution system.

  12. Exploring current and projected tradeoffs between hydropower profitability and reliability of supply in the Alps

    NASA Astrophysics Data System (ADS)

    Anghileri, D.; Castelletti, A.; Burlando, P.

    2015-12-01

    The recent spreading of renewable energy across Europe and the associated production variability and uncertainty are emerging challenges for hydropower system operation. Widely distributed and highly intermittent solar and wind power generation systems, along with feed-in-tariffs, at which they are remunerated, are threating the operation of traditional hydropower systems. For instance, in countries where the transition to a larger production by means of renewable power systems is a novel process, e.g. Switzerland, many hydropower companies are operating their reservoirs with low or no profits, claiming for a revision of the entire energy market system. This situation goes along with the problem of ensuring energy supply both nowadays and in the future, with changing energy demand and available water resources. In this work, we focus on a hydropower system in the Swiss Alps to explore how different operating policies can cope with both adequate energy supply and profitable operation under current and future climate and socio-economic conditions. We investigate the operation of the Mattmark reservoir in South-West Switzerland. Mattmark is a pumped reservoir of 98 106 m3 fed by a natural catchment of 37 km2 and contributing catchments, summing up to 51 km2, connected by several diversion channels. The hydrological regime, snow- and ice-melt dominated, has already experienced changes in the last decades due to glacier retreat and is expected to be strongly impacted by climate change in the future. We use Multi-Objective optimization techniques to explore current tradeoffs between profitability and secure supply. We then investigate how tradeoffs may evolve in time under different climate change projections and energy market scenarios. Results inform on the co-evolution of climate- and socio-economic induced variations, thus unveiling potential co-benefit situations to hydropower generation and providing insights to future energy market design.

  13. Resonant power supplies for a rapid-cycling accelerator

    NASA Astrophysics Data System (ADS)

    Karady, G.; Thiessen, H. A.; Schneider, E. J.

    1988-10-01

    A resonant power supply has been proposed as an efficient power supply for a future 60-GeV, Kaon-producing accelerator. The engineering design of the electric system of the main-ring power supplies is described. It is shown that the resonant power supply can be built with standard commercially available components. The most critical component is the bypass switch, which requires gate-turn off thyristors, connected in parallel. Standard metal-clad switchgear can be used for the AC system. The resonant power supplies can be fed directly from the 115-kV utility network, but the resonance power supplies draw pulse loads from the utility network. This pulse may produce disturbances. AC filter and reactive power compensation is needed for economical operation.

  14. Metropolitan Washington Area Water Supply Study. Appendix G. Non-Structural Studies.

    DTIC Science & Technology

    1983-09-01

    should minimize any impacts to the surrounding areas. The effects of land application systems on the socio -economic aspects of a community include... conflict this outfall might create with respect to the Washington Aqueduct Emergency Estuary Pumping Station. The operation of this intake, designed for...PB 214 970). " Socio -Economic Impact Study of Alternative Water Supply Systems," Annex D, Volume II, Washington Metropolitan Area Water Supply Study

  15. KSC01PD1784

    NASA Image and Video Library

    2001-12-05

    KENNEDY SPACE CENTER, Fla. -- The STS-108 and Expedition 4 crews head for the Astrovan and a ride to Launch Pad 39B. Leading the way are Pilot Mark E. Kelly (left) and Commander Dominic L. Gorie; behind them are Mission Specialists Daniel M. Tani and Linda A. Godwin; next is Expedition 4 Commander Yuri Onufrienko, followed by astronauts Daniel W. Bursch (left) and Carl E. Walz. This is the second launch attempt after the first attempt Dec. 4 was scrubbed due to poor weather conditions at KSC. The main goals of the mission are to carry the Expedition 4 crew to the International Space Station as replacement for Expedition 3; carry the Multi-Purpose Logistics Module Raffaello filled with water, equipment and supplies; and install thermal blankets over equipment at the base of the ISS solar wings. STS-108 is the final Shuttle mission of 2001 and the 107th Shuttle flight overall. Launch is scheduled for 5:19 p.m. EST (22:19 GMT) Dec. 5, 2001, from Launch Pad 39B

  16. Multi-objective evolutionary optimization for the joint operation of reservoirs of water supply under water-food-energy nexus management

    NASA Astrophysics Data System (ADS)

    Uen, T. S.; Tsai, W. P.; Chang, F. J.; Huang, A.

    2016-12-01

    In recent years, urbanization had a great effect on the growth of population and the resource management scheme of water, food and energy nexus (WFE nexus) in Taiwan. Resource shortages of WFE become a long-term and thorny issue due to the complex interactions of WFE nexus. In consideration of rapid socio-economic development, it is imperative to explore an efficient and practical approach for WFE resources management. This study aims to search the optimal solution to WFE nexus and construct a stable water supply system for multiple stakeholders. The Shimen Reservoir and Feitsui Reservoir in northern Taiwan are chosen to conduct the joint operation of the two reservoirs for water supply. This study intends to achieve water resource allocation from the two reservoirs subject to different operating rules and restrictions of resource allocation. The multi-objectives of the joint operation aim at maximizing hydro-power synergistic gains while minimizing water supply deficiency as well as food shortages. We propose to build a multi-objective evolutionary optimization model for analyzing the hydro-power synergistic gains to suggest the most favorable solutions in terms of tradeoffs between WFE. First, this study collected data from two reservoirs and Taiwan power company. Next, we built a WFE nexus model based on system dynamics. Finally, this study optimized the joint operation of the two reservoirs and calculated the synergy of hydro-power generation. The proposed methodology can tackle the complex joint reservoir operation problems. Results can suggest a reliable policy for joint reservoir operation for creating a green economic city under the lowest risks of water supply.

  17. VAXCMS - VAX CONTINUOUS MONITORING SYSTEM, VERSION 2.2

    NASA Technical Reports Server (NTRS)

    Farkas, L.

    1994-01-01

    The VAX Continuous Monitoring System (VAXCMS) was developed at NASA Headquarters to aid system managers in monitoring the performance of VAX systems through the generation of graphic images which summarize trends in performance metrics over time. Since its initial development, VAXCMS has been extensively modified at the NASA Lewis Research Center. Data is produced by utilizing the VMS MONITOR utility to collect the performance data, and then feeding the data through custom-developed linkages to the Computer Associates' TELL-A-GRAF computer graphics software to generate the chart images for analysis by the system manager. The VMS ACCOUNTING utility is also utilized to gather interactive process information. The charts that are generated by VAXCMS are: 1) CPU modes for each node over the most recent four month period 2) CPU modes for the cluster as a whole using a weighted average of all the nodes in the cluster based on processing power 3) Percent of primary memory in use for each node over the most recent four month period 4) Interactive processes for all nodes over the most recent four month period 5) Daily, weekly, and monthly, performance summaries for CPU modes, percent of primary memory in use, and page fault rates for each node 6) Daily disk I/O performance data plotting Average Disk I/O Response Time based on I/O Operation Rate and Queue Length. VAXCMS is written in DCL and VAX FORTRAN for use with DEC VAX series computers running VMS 5.1 or later. This program requires the TELL-A-GRAF graphics package in order to generate plots of system data. A FORTRAN compiler is required. The standard distribution medium for VAXCMS is a 9-track 1600 BPI magnetic tape in DEC VAX BACKUP format. It is also available on a TK50 tape cartridge in DEC VAX BACKUP format. An electronic copy of the documentation in ASCII format is included on the distribution medium. Portions of this code are copyrighted by Mr. David Lavery and are distributed with his permission. These portions of the code may not be redistributed commercially.

  18. 49 CFR 393.23 - Power supply for lamps.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 49 Transportation 5 2013-10-01 2013-10-01 false Power supply for lamps. 393.23 Section 393.23... NECESSARY FOR SAFE OPERATION Lamps, Reflective Devices, and Electrical Wiring § 393.23 Power supply for lamps. All required lamps must be powered by the electrical system of the motor vehicle with the...

  19. 49 CFR 393.23 - Power supply for lamps.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 49 Transportation 5 2012-10-01 2012-10-01 false Power supply for lamps. 393.23 Section 393.23... NECESSARY FOR SAFE OPERATION Lamps, Reflective Devices, and Electrical Wiring § 393.23 Power supply for lamps. All required lamps must be powered by the electrical system of the motor vehicle with the...

  20. An approach for formalising the supply chain operations

    NASA Astrophysics Data System (ADS)

    Zdravković, Milan; Panetto, Hervé; Trajanović, Miroslav; Aubry, Alexis

    2011-11-01

    Reference models play an important role in the knowledge management of the various complex collaboration domains (such as supply chain networks). However, they often show a lack of semantic precision and, they are sometimes incomplete. In this article, we present an approach to overcome semantic inconsistencies and incompleteness of the Supply Chain Operations Reference (SCOR) model and hence improve its usefulness and expand the application domain. First, we describe a literal web ontology language (OWL) specification of SCOR concepts (and related tools) built with the intention to preserve the original approach in the classification of process reference model entities, and hence enable the effectiveness of usage in original contexts. Next, we demonstrate the system for its exploitation, in specific - tools for SCOR framework browsing and rapid supply chain process configuration. Then, we describe the SCOR-Full ontology, its relations with relevant domain ontology and show how it can be exploited for improvement of SCOR ontological framework competence. Finally, we elaborate the potential impact of the presented approach, to interoperability of systems in supply chain networks.

  1. Performance analysis of Supply Chain Management with Supply Chain Operation reference model

    NASA Astrophysics Data System (ADS)

    Hasibuan, Abdurrozzaq; Arfah, Mahrani; Parinduri, Luthfi; Hernawati, Tri; Suliawati; Harahap, Bonar; Rahmah Sibuea, Siti; Krianto Sulaiman, Oris; purwadi, Adi

    2018-04-01

    This research was conducted at PT. Shamrock Manufacturing Corpora, the company is required to think creatively to implement competition strategy by producing goods/services that are more qualified, cheaper. Therefore, it is necessary to measure the performance of Supply Chain Management in order to improve the competitiveness. Therefore, the company is required to optimize its production output to meet the export quality standard. This research begins with the creation of initial dimensions based on Supply Chain Management process, ie Plan, Source, Make, Delivery, and Return with hierarchy based on Supply Chain Reference Operation that is Reliability, Responsiveness, Agility, Cost, and Asset. Key Performance Indicator identification becomes a benchmark in performance measurement whereas Snorm De Boer normalization serves to equalize Key Performance Indicator value. Analiytical Hierarchy Process is done to assist in determining priority criteria. Measurement of Supply Chain Management performance at PT. Shamrock Manufacturing Corpora produces SC. Responsiveness (0.649) has higher weight (priority) than other alternatives. The result of performance analysis using Supply Chain Reference Operation model of Supply Chain Management performance at PT. Shamrock Manufacturing Corpora looks good because its monitoring system between 50-100 is good.

  2. Hydraulics for Operators. Training Module 1.330.2.77.

    ERIC Educational Resources Information Center

    Bengston, Harlan H.

    This document is an instructional module package prepared in objective form for use by an instructor familiar with the application of hydraulic principles for operation and maintenance of water supply systems, water distribution systems, wastewater treatment systems and wastewater collection systems. Included are objectives, instructor guides,…

  3. 13 CFR 120.490 - Audits.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... financial statement submitted to SBA before the audit. The fee schedule is set forth in SBA's Standard Operating Procedures manual. [61 FR 3235, Jan. 31, 1996. Redesignated at 73 FR 75516, Dec. 11, 2008] ...

  4. 13 CFR 120.490 - Audits.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... financial statement submitted to SBA before the audit. The fee schedule is set forth in SBA's Standard Operating Procedures manual. [61 FR 3235, Jan. 31, 1996. Redesignated at 73 FR 75516, Dec. 11, 2008] ...

  5. 13 CFR 120.490 - Audits.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... financial statement submitted to SBA before the audit. The fee schedule is set forth in SBA's Standard Operating Procedures manual. [61 FR 3235, Jan. 31, 1996. Redesignated at 73 FR 75516, Dec. 11, 2008] ...

  6. 13 CFR 120.490 - Audits.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... financial statement submitted to SBA before the audit. The fee schedule is set forth in SBA's Standard Operating Procedures manual. [61 FR 3235, Jan. 31, 1996. Redesignated at 73 FR 75516, Dec. 11, 2008] ...

  7. 13 CFR 120.490 - Audits.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... financial statement submitted to SBA before the audit. The fee schedule is set forth in SBA's Standard Operating Procedures manual. [61 FR 3235, Jan. 31, 1996. Redesignated at 73 FR 75516, Dec. 11, 2008] ...

  8. Control of hydrocarbon emissions from gasoline loading by refrigeration systems. Final report Dec 80-Apr 81

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Battye, W.; Brown, P.; Misenheimer, D.

    1981-07-01

    The report gives results of a study of the capabilities of refrigeration systems, operated at three temperatures, to control volatile organic compound (VOC) emissions from truck loading at bulk gasoline terminals. Achievable VOC emission rates were calculated for refrigeration systems cooling various gasoline/air mixtures to -62 C, -73 C, and -84 C by estimating vapor/liquid equilibrium compositions for VOC/air mixtures. Emission rates were calculated for inlet streams containing vapors from low- and high-volatility gasolines at concentrations of 15, 30, and 50% by volume (22.5, 45, and 75% measured as propane). Predicted VOC emission rates for systems cooling various inlet streamsmore » to -62 C ranged from 48 to 59 mg VOC/liter of gasoline loaded. Predicted VOC were 21 to 28 mg/l loaded for systems operating at -73 C and 8.7 to 12 mg/l loaded for systems operating at -84 C. Compressor electrical requirements and relative capital costs for systems operating at the above temperatures were estimated for model systems using the results of a computer simulation. Compressor electrical requirements ranged from 0.11 to 0.45 Whr/l loaded, depending on the inlet VOC concentration and the outlet temperature. The capital cost to build a system designed to cool vapors to -84 C is estimated to be about 9% higher than for a system designed to operate at -73 C.« less

  9. LAS - LAND ANALYSIS SYSTEM, VERSION 5.0

    NASA Technical Reports Server (NTRS)

    Pease, P. B.

    1994-01-01

    The Land Analysis System (LAS) is an image analysis system designed to manipulate and analyze digital data in raster format and provide the user with a wide spectrum of functions and statistical tools for analysis. LAS offers these features under VMS with optional image display capabilities for IVAS and other display devices as well as the X-Windows environment. LAS provides a flexible framework for algorithm development as well as for the processing and analysis of image data. Users may choose between mouse-driven commands or the traditional command line input mode. LAS functions include supervised and unsupervised image classification, film product generation, geometric registration, image repair, radiometric correction and image statistical analysis. Data files accepted by LAS include formats such as Multi-Spectral Scanner (MSS), Thematic Mapper (TM) and Advanced Very High Resolution Radiometer (AVHRR). The enhanced geometric registration package now includes both image to image and map to map transformations. The over 200 LAS functions fall into image processing scenario categories which include: arithmetic and logical functions, data transformations, fourier transforms, geometric registration, hard copy output, image restoration, intensity transformation, multispectral and statistical analysis, file transfer, tape profiling and file management among others. Internal improvements to the LAS code have eliminated the VAX VMS dependencies and improved overall system performance. The maximum LAS image size has been increased to 20,000 lines by 20,000 samples with a maximum of 256 bands per image. The catalog management system used in earlier versions of LAS has been replaced by a more streamlined and maintenance-free method of file management. This system is not dependent on VAX/VMS and relies on file naming conventions alone to allow the use of identical LAS file names on different operating systems. While the LAS code has been improved, the original capabilities of the system have been preserved. These include maintaining associated image history, session logging, and batch, asynchronous and interactive mode of operation. The LAS application programs are integrated under version 4.1 of an interface called the Transportable Applications Executive (TAE). TAE 4.1 has four modes of user interaction: menu, direct command, tutor (or help), and dynamic tutor. In addition TAE 4.1 allows the operation of LAS functions using mouse-driven commands under the TAE-Facelift environment provided with TAE 4.1. These modes of operation allow users, from the beginner to the expert, to exercise specific application options. LAS is written in C-language and FORTRAN 77 for use with DEC VAX computers running VMS with approximately 16Mb of physical memory. This program runs under TAE 4.1. Since TAE 4.1 is not a current version of TAE, TAE 4.1 is included within the LAS distribution. Approximately 130,000 blocks (65Mb) of disk storage space are necessary to store the source code and files generated by the installation procedure for LAS and 44,000 blocks (22Mb) of disk storage space are necessary for TAE 4.1 installation. The only other dependencies for LAS are the subroutine libraries for the specific display device(s) that will be used with LAS/DMS (e.g. X-Windows and/or IVAS). The standard distribution medium for LAS is a set of two 9track 6250 BPI magnetic tapes in DEC VAX BACKUP format. It is also available on a set of two TK50 tape cartridges in DEC VAX BACKUP format. This program was developed in 1986 and last updated in 1992.

  10. In-Situ Propellant Supplied Lunar Lander Concept

    NASA Astrophysics Data System (ADS)

    Donahue, Benjamin; Maulsby, Curtis

    2008-01-01

    Future NASA and commercial Lunar missions will require innovative spacecraft configurations incorporating reliable, sustainable propulsion, propellant storage, power and crew life support technologies that can evolve into long duration, partially autonomous systems that can be used to emplace and sustain the massive supplies required for a permanently occupied lunar base. Ambitious surface science missions will require efficient Lunar transfer systems to provide the consumables, science equipment, energy generation systems, habitation systems and crew provisions necessary for lengthy tours on the surface. Lunar lander descent and ascent stages become significantly more efficient when they can be refueled on the Lunar surface and operated numerous times. Landers enabled by Lunar In-Situ Propellant Production (ISPP) facilities will greatly ease constraints on spacecraft mass and payload delivery capability, and may operate much more affordably (in the long term) then landers that are dependant on Earth supplied propellants. In this paper, a Lander concept that leverages ISPP is described and its performance is quantified. Landers, operating as sortie vehicles from Low Lunar Orbit, with efficiencies facilitated by ISPP will enable economical utilization and enhancements that will provide increasingly valuable science yields from Lunar Bases.

  11. Improving the current system for supplying organs for transplantation.

    PubMed

    Horton, R L; Horton, P J

    1993-01-01

    The United States currently relies on a voluntary, altruistic system for supplying organs for transplantation. It is now generally recognized that this system, as currently operated, produces a seriously inadequate supply of organs. A number of scholars have argued that some type of (generally unspecified) market system is necessary. Two articles appearing in the Journal of Health Politics, Policy and Law have proposed relatively specific market systems for increasing the supply of organs. In this paper we argue that market systems are at best premature. In particular, there is little to suggest that any type of market system for organs will be permitted in the United States in the foreseeable future. We present data that strongly suggest that the current voluntary, altruistic system has not been developed to its full potential and offer a number of specific suggestions for improving the system.

  12. Distributed situation awareness in complex collaborative systems: A field study of bridge operations on platform supply vessels

    PubMed Central

    Sandhåland, Hilde; Oltedal, Helle A; Hystad, Sigurd W; Eid, Jarle

    2015-01-01

    This study provides empirical data about shipboard practices in bridge operations on board a selection of platform supply vessels (PSVs). Using the theoretical concept of distributed situation awareness, the study examines how situation awareness (SA)-related information is distributed and coordinated at the bridge. This study thus favours a systems approach to studying SA, viewing it not as a phenomenon that solely happens in each individual's mind but rather as something that happens between individuals and the tools that they use in a collaborative system. Thus, this study adds to our understanding of SA as a distributed phenomenon. Data were collected in four field studies that lasted between 8 and 14 days on PSVs that operate on the Norwegian continental shelf and UK continental shelf. The study revealed pronounced variations in shipboard practices regarding how the bridge team attended to operational planning, communication procedures, and distracting/interrupting factors during operations. These findings shed new light on how SA might decrease in bridge teams during platform supply operations. The findings from this study emphasize the need to assess and establish shipboard practices that support the bridge teams' SA needs in day-to-day operations. Practitioner points Provides insights into how shipboard practices that are relevant to planning, communication and the occurrence of distracting/interrupting factors are realized in bridge operations. Notes possible areas for improvement to enhance distributed SA in bridge operations. PMID:26028823

  13. Soviet Operational Art: Will There be a Significant Shift in the Focus of Soviet Operational Art

    DTIC Science & Technology

    1989-03-06

    conduct of war. 4 The most important of the six main elements of military science is military art . Military art includes military strategy...AD-A215 778 SOVIET OPERATIONAL ART :, WILL THERE BE A SIGNIFICANT SHIFT IN THE FOCUS OF SOVIET OPERATIONAL ART ? Lwori I i %.Afl S FELECTE DEC 19 1989A...NO NO NO, ACCESSION NO 11 TITLE (Include Security Classification) 5,’ .... Soviet Operational Art : Wi

  14. Development and Evaluation of Control System for Microgrid Supplying Heat and Electricity

    NASA Astrophysics Data System (ADS)

    Kojima, Yasuhiro; Koshio, Masanobu; Nakamura, Shizuka

    Photovoltaic (PV) and Wind Turbine (WT) generation systems are expected to offer solutions to reduce green house gases and become more widely used in the future. However, the chief technical drawback of using these kinds of weather-dependent generators is the difficulty of forecasting their output, which can have negative impacts on commercial grids if a large number of them are introduced. Thus, this problem may hinder the wider application of PV and WT generation systems. The Regional Power Grid with Renewable Energy Resources Project was launched to seek a solution to this problem. The scope of the project is to develop, operate, and evaluate a Dispersed Renewable Energy Supply System with the ability to adapt the total energy output in response to changes in weather and demand. Such a system would reduce the impact that PV and WT generation systems have on commercial grids and allow the interconnection of more Dispersed Energy Resources (DER). In other words, the main objective of this project is to demonstrate an integrated energy management system, or a type of microgrid [1], as a new way of introducing DERs. The system has been in operation since October 2005 and will continue operation until March 2008. Through the project period, the data on power quality, system efficiency, operation cost, and environmental burden will be gathered and a cost-benefit analysis of the system will be undertaken. In this paper, firstly we introduce the concept of microgrid for reducing negative impact of natural energy, and secondly illustrate the structure of electric and thermal supply control system for Microgrid, especially for the Hachinohe demonstration project. The control system consists of four stages; weekly operation planning, economic dispatching control, tie-line control and local frequency control. And finally demonstration results and evaluation results are shown.

  15. Development Status of the NSTAR Ion Propulsion System Power Processor

    NASA Technical Reports Server (NTRS)

    Hamley, John A.; Pinero, Luis R.; Rawlin, Vincent K.; Miller, John R.; Cartier, Kevin C.; Bowers, Glen E.

    1995-01-01

    A 0.5-2.3 kW xenon ion propulsion system is presently being developed under the NASA Solar Electric Propulsion Technology Application Readiness (NSTAR) program. This propulsion system includes a 30 cm diameter xenon ion thruster, a Digital Control Interface Unit, a xenon feed system, and a power processing unit (PPU). The PPU consists of the power supply assemblies which operate the thruster neutralizer, main discharge chamber, and ion optics. Also included are recycle logic and a digital microcontroller. The neutralizer and discharge power supplies employ a dual use configuration which combines the functions of two power supplies into one, significantly simplifying the PPU. Further simplification was realized by implementing a single thruster control loop which regulates the beam current via the discharge current. Continuous throttling is possible over a 0.5-2.3 kW output power range. All three power supplies have been fabricated and tested with resistive loads, and have been combined into a single breadboard unit with the recycle logic and microcontroller. All line and load regulation test results show the power supplies to be within the NSTAR flight PPU specified power output of 1.98 kW. The overall efficiency of the PPU, calculated as the combined efficiencies of the power supplies and controller, at 2.3 kW delivered to resistive loads was 0.90. The component was 6.16 kg. Integration testing of the neutralizer and discharge power supplies with a functional model thruster revealed no issues with discharge ignition or steady state operation.

  16. Simulations of incompressible Navier Stokes equations on curved surfaces using discrete exterior calculus

    NASA Astrophysics Data System (ADS)

    Samtaney, Ravi; Mohamed, Mamdouh; Hirani, Anil

    2015-11-01

    We present examples of numerical solutions of incompressible flow on 2D curved domains. The Navier-Stokes equations are first rewritten using the exterior calculus notation, replacing vector calculus differential operators by the exterior derivative, Hodge star and wedge product operators. A conservative discretization of Navier-Stokes equations on simplicial meshes is developed based on discrete exterior calculus (DEC). The discretization is then carried out by substituting the corresponding discrete operators based on the DEC framework. By construction, the method is conservative in that both the discrete divergence and circulation are conserved up to machine precision. The relative error in kinetic energy for inviscid flow test cases converges in a second order fashion with both the mesh size and the time step. Numerical examples include Taylor vortices on a sphere, Stuart vortices on a sphere, and flow past a cylinder on domains with varying curvature. Supported by the KAUST Office of Competitive Research Funds under Award No. URF/1/1401-01.

  17. Operation reliability analysis of independent power plants of gas-transmission system distant production facilities

    NASA Astrophysics Data System (ADS)

    Piskunov, Maksim V.; Voytkov, Ivan S.; Vysokomornaya, Olga V.; Vysokomorny, Vladimir S.

    2015-01-01

    The new approach was developed to analyze the failure causes in operation of linear facilities independent power supply sources (mini-CHP-plants) of gas-transmission system in Eastern part of Russia. Triggering conditions of ceiling operation substance temperature at condenser output were determined with mathematical simulation use of unsteady heat and mass transfer processes in condenser of mini-CHP-plants. Under these conditions the failure probability in operation of independent power supply sources is increased. Influence of environmental factors (in particular, ambient temperature) as well as output electric capability values of power plant on mini-CHP-plant operation reliability was analyzed. Values of mean time to failure and power plant failure density during operation in different regions of Eastern Siberia and Far East of Russia were received with use of numerical simulation results of heat and mass transfer processes at operation substance condensation.

  18. Considerations of the Skilled Manpower Needs for Water Supply Systems.

    ERIC Educational Resources Information Center

    Watters, Gregor

    1981-01-01

    General methods for determining skilled labor needs for water supply and wastewater treatment plant operation as applied in Turkey are outlined along with a model program for training personnel to meet these needs. (DC)

  19. Export growth, energy costs, and sustainable supply chains

    DOT National Transportation Integrated Search

    2010-11-01

    The report examines sustainable supply chains in North America and the role played by rail intermodal : operations in lowering ten-mile fuel and emission costs. It examines whether current systems favor imports : over exports a current complaint ...

  20. The Shock and Vibration Bulletin. Part 4. Prediction and Experimental Techniques, Isolation and Damping

    DTIC Science & Technology

    1973-06-01

    one in laboratory tests. All components of the hydraulic power supply system, with the exceptions of the pumps and the heat exchanger, are located...servoactuator operated by a hydraulic power supply and a control electronics package mounted inside the cabin. For the seat isolation system, the...compensate for the static load b>ing supported. The actuators are the sole supportl.g link in the vertical direction. Hydraulic Power Supply The

  1. Design description of the Schuchuli Village photovoltaic power system

    NASA Technical Reports Server (NTRS)

    Ratajczak, A. F.; Vasicek, R. W.; Delombard, R.

    1981-01-01

    A stand alone photovoltaic (PV) power system for the village of Schuchuli (Gunsight), Arizona, on the Papago Indian Reservation is a limited energy, all 120 V (d.c.) system to which loads cannot be arbitrarily added and consists of a 3.5 kW (peak) PV array, 2380 ampere-hours of battery storage, an electrical equipment building, a 120 V (d.c.) electrical distribution network, and equipment and automatic controls to provide control power for pumping water into an existing water system; operating 15 refrigerators, a clothes washing machine, a sewing machine, and lights for each of the homes and communal buildings. A solar hot water heater supplies hot water for the washing machine and communal laundry. Automatic control systems provide voltage control by limiting the number of PV strings supplying power during system operation and battery charging, and load management for operating high priority at the expense of low priority loads as the main battery becomes depleted.

  2. Operational Art in I Field Force, 1965 to 1967

    DTIC Science & Technology

    2012-10-17

    Approved for Public Release; Distribution is Unlimited Operational Art in I Field Force, 1965 to 1967 A Monograph by MAJ John E. Turner...Monograph 3. DATES COVERED (From - To) JAN 2012 – DEC 2012 4. TITLE AND SUBTITLE Operational Art in I Field Force, 1965-1967 5a. CONTRACT NUMBER...operational art from 1965 through 1967 under the leadership of LTG Stanley Larsen in the II Corps Tactical Zone (II CORPS). This accomplishment is

  3. How does network design constrain optimal operation of intermittent water supply?

    NASA Astrophysics Data System (ADS)

    Lieb, Anna; Wilkening, Jon; Rycroft, Chris

    2015-11-01

    Urban water distribution systems do not always supply water continuously or reliably. As pipes fill and empty, pressure transients may contribute to degraded infrastructure and poor water quality. To help understand and manage this undesirable side effect of intermittent water supply--a phenomenon affecting hundreds of millions of people in cities around the world--we study the relative contributions of fixed versus dynamic properties of the network. Using a dynamical model of unsteady transition pipe flow, we study how different elements of network design, such as network geometry, pipe material, and pipe slope, contribute to undesirable pressure transients. Using an optimization framework, we then investigate to what extent network operation decisions such as supply timing and inflow rate may mitigate these effects. We characterize some aspects of network design that make them more or less amenable to operational optimization.

  4. A Study of Three Phase and Single Phase High Frequency Distribution Systems

    DTIC Science & Technology

    1989-09-20

    single Schwarz converter which operates in a variable frequency mode and acts as a regulated dc power supply . This mode of operation is used to maintain a...conditioning stages. The first stage contains a single Schwarz converter which operates in a variable frequency mode and acts as a regulated dc power supply ...dependent upon the amount of current ripple the capacitor must sink. This determines the capacitor heating since the power dissipated is equal to 2R

  5. Modeling sustainability in renewable energy supply chain systems

    NASA Astrophysics Data System (ADS)

    Xie, Fei

    This dissertation aims at modeling sustainability of renewable fuel supply chain systems against emerging challenges. In particular, the dissertation focuses on the biofuel supply chain system design, and manages to develop advanced modeling framework and corresponding solution methods in tackling challenges in sustaining biofuel supply chain systems. These challenges include: (1) to integrate "environmental thinking" into the long-term biofuel supply chain planning; (2) to adopt multimodal transportation to mitigate seasonality in biofuel supply chain operations; (3) to provide strategies in hedging against uncertainty from conversion technology; and (4) to develop methodologies in long-term sequential planning of the biofuel supply chain under uncertainties. All models are mixed integer programs, which also involves multi-objective programming method and two-stage/multistage stochastic programming methods. In particular for the long-term sequential planning under uncertainties, to reduce the computational challenges due to the exponential expansion of the scenario tree, I also developed efficient ND-Max method which is more efficient than CPLEX and Nested Decomposition method. Through result analysis of four independent studies, it is found that the proposed modeling frameworks can effectively improve the economic performance, enhance environmental benefits and reduce risks due to systems uncertainties for the biofuel supply chain systems.

  6. KSC-07pd3643

    NASA Image and Video Library

    2007-12-14

    KENNEDY SPACE CENTER, FLA. -- In the cryogenic test bed facility at NASA's Kennedy Space Center, Time Domain Reflectometry, or TDR, instrumentation is being exposed to "wet" super-cold temperatures for identifying the signature of a cryogenic environment and calibrating the TDR equipment. The equipment will be used at the launch pad to test a procedure identical to a tanking test on space shuttle Atlantis' external tank planned for Dec. 18. The shuttle's planned launches on Dec. 6 and Dec. 9 were postponed because of false readings from the part of the engine cut-off, or ECO, sensor system that monitors the liquid hydrogen section of the tank. The liftoff date from NASA's Kennedy Space Center, Florida, is now targeted for Jan. 10, depending on the resolution of the problem in the fuel sensor system. Photo credit: NASA/Kim Shiflett

  7. KSC-07pd3639

    NASA Image and Video Library

    2007-12-14

    KENNEDY SPACE CENTER, FLA. -- In the cryogenic test bed facility at NASA's Kennedy Space Center, Time Domain Reflectometry, or TDR, instrumentation is being exposed to "wet" super-cold temperatures for identifying the signature of a cryogenic environment and calibrating the TDR equipment. The equipment will be used at the launch pad to test a procedure identical to a tanking test on space shuttle Atlantis' external tank planned for Dec. 18. The shuttle's planned launches on Dec. 6 and Dec. 9 were postponed because of false readings from the part of the engine cut-off, or ECO, sensor system that monitors the liquid hydrogen section of the tank. The liftoff date from NASA's Kennedy Space Center, Florida, is now targeted for Jan. 10, depending on the resolution of the problem in the fuel sensor system. Photo credit: NASA/Kim Shiflett

  8. KSC-07pd3640

    NASA Image and Video Library

    2007-12-14

    KENNEDY SPACE CENTER, FLA. -- In the cryogenic test bed facility at NASA's Kennedy Space Center, Time Domain Reflectometry, or TDR, instrumentation is being exposed to "wet" super-cold temperatures for identifying the signature of a cryogenic environment and calibrating the TDR equipment. The equipment will be used at the launch pad to test a procedure identical to a tanking test on space shuttle Atlantis' external tank planned for Dec. 18. The shuttle's planned launches on Dec. 6 and Dec. 9 were postponed because of false readings from the part of the engine cut-off, or ECO, sensor system that monitors the liquid hydrogen section of the tank. The liftoff date from NASA's Kennedy Space Center, Florida, is now targeted for Jan. 10, depending on the resolution of the problem in the fuel sensor system. Photo credit: NASA/Kim Shiflett

  9. KSC-07pd3641

    NASA Image and Video Library

    2007-12-14

    KENNEDY SPACE CENTER, FLA. -- In the cryogenic test bed facility at NASA's Kennedy Space Center, Time Domain Reflectometry, or TDR, instrumentation is being exposed to "wet" super-cold temperatures for identifying the signature of a cryogenic environment and calibrating the TDR equipment. The equipment will be used at the launch pad to test a procedure identical to a tanking test on space shuttle Atlantis' external tank planned for Dec. 18. The shuttle's planned launches on Dec. 6 and Dec. 9 were postponed because of false readings from the part of the engine cut-off, or ECO, sensor system that monitors the liquid hydrogen section of the tank. The liftoff date from NASA's Kennedy Space Center, Florida, is now targeted for Jan. 10, depending on the resolution of the problem in the fuel sensor system. Photo credit: NASA/Kim Shiflett

  10. NASA Docking System (NDS) Interface Definitions Document (IDD). Revision F, Dec. 15, 2011

    NASA Technical Reports Server (NTRS)

    Lewis, James

    2011-01-01

    The NASA Docking System (NDS) mating system supports low approach velocity docking and provides a modular and reconfigurable standard interface, supporting crewed and autonomous vehicles during mating and assembly operations. The NDS is NASA s implementation for the International Docking System Standard (IDSS) using low impact docking technology. All NDS configurations can mate with the configuration specified in the IDSS Interface Definition Document (IDD), Revision A, released May 13, 2011. The NDS evolved from the Low Impact Docking System (LIDS). The term (and its associated acronym), international Low Impact Docking System (iLIDS) is also used to describe this system. NDS and iLIDS may be used interchangeability. Some of the heritage documentation and implementations (e.g., software command names) used on the NDS will continue to use the LIDS acronym.

  11. Characterizing Radio Emission From Extensive Air Showers with the SLAC-T510 Experiment, with Applications to ANITA

    NASA Astrophysics Data System (ADS)

    McGuire, Felicia Ann

    Essential to metal-oxide-semiconductor field-effect transistor (MOSFET) scaling is the reduction of the supply voltage to mitigate the power consumption and corresponding heat dissipation. Conventional dielectric materials are subject to the thermal limit imposed by the Boltzmann factor in the subthreshold swing, which places an absolute minimum on the supply voltage required to modulate the current. Furthermore, as technology approaches the 5 nm node, electrostatic control of a silicon channel becomes exceedingly difficult, regardless of the gating technique. This notion of "the end of silicon scaling" has rapidly increased research into more scalable channel materials as well as new methods of transistor operation. Among the many promising options are two-dimensional (2D) FETs and negative capacitance (NC) FETs. 2D-FETs make use of atomically thin semiconducting channels that have enabled demonstrated scalability beyond what silicon can offer. NC-FETs demonstrate an effective negative capacitance arising from the integration of a ferroelectric into the transistor gate stack, allowing sub-60 mV/dec switching. While both of these devices provide significant advantages, neither can accomplish the ultimate goal of a FET that is both low-voltage and scalable. However, an appropriate fusion of the 2D-FET and NC-FET into a 2D NC-FET has the potential of enabling a steep-switching device that is dimensionally scalable beyond the 5 nm technology node. In this work, the motivation for and operation of 2D NC-FETs is presented. Experimental realization of 2D NC-FETs using 2D transition metal dichalcogenide molybdenum disulfide (MoS2) as the channel is shown with two different ferroelectric materials: 1) a solution-processed, polymeric poly(vinylidene difluoride trifluoroethylene) ferroelectric and 2) an atomic layer deposition (ALD) grown hafnium zirconium oxide (HfZrO2) ferroelectric. Each ferroelectric was integrated into the gate stack of a 2D-FET having either a top-gate (polymeric ferroelectric) or bottom-gate (HfZrO2 ferroelectric) configuration. HfZrO 2 devices with metallic interfacial layers (between ferroelectric and dielectric) and thinner ferroelectric layers were found to reduce both the hysteresis and the threshold voltage. Detailed characterization of the devices was performed and, most significantly, the 2D NC-FETs with HfZrO2 reproducibly yielded subthreshold swings well below the thermal limit with over more than four orders of magnitude in drain current modulation. HfZrO 2 devices without metallic interfacial layers were utilized to explore the impact of ferroelectric thickness, dielectric thickness, and dielectric composition on device performance. The impact of an interfacial metallic layer on the device operation was investigated in devices with HfZrO2 and shown to be crucial at enabling sub-60 mV/dec switching and large internal voltage gains. The significance of dielectric material choice on device performance was explored and found to be a critical factor in 2D NC-FET transistor operation. These successful results pave the way for future integration of this new device structure into existing technology markets.

  12. 47 CFR 15.250 - Operation of wideband systems within the band 5925-7250 MHz.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... of wideband systems within the band 5925-7250 MHz. (a) The −10 dB bandwidth of a device operating... 47 Telecommunication 1 2010-10-01 2010-10-01 false Operation of wideband systems within the band... variations in temperature and supply voltage. (b) The −10 dB bandwidth of the fundamental emission shall be...

  13. Protonic/electronic hybrid oxide transistor gated by chitosan and its full-swing low voltage inverter applications

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Chao, Jin Yu; Ningbo Institute of Material Technology and Engineering, Chinese Academy of Sciences, Ningbo 315201; Zhu, Li Qiang, E-mail: lqzhu@nimte.ac.cn

    Modulation of charge carrier density in condensed materials based on ionic/electronic interaction has attracted much attention. Here, protonic/electronic hybrid indium-zinc-oxide (IZO) transistors gated by chitosan based electrolyte were obtained. The chitosan-based electrolyte illustrates a high proton conductivity and an extremely strong proton gating behavior. The transistor illustrates good electrical performances at a low operating voltage of ∼1.0 V such as on/off ratio of ∼3 × 10{sup 7}, subthreshold swing of ∼65 mV/dec, threshold voltage of ∼0.3 V, and mobility of ∼7 cm{sup 2}/V s. Good positive gate bias stress stabilities are obtained. Furthermore, a low voltage driven resistor-loaded inverter was built by using an IZO transistor inmore » series with a load resistor, exhibiting a linear relationship between the voltage gain and the supplied voltage. The inverter is also used for decreasing noises of input signals. The protonic/electronic hybrid IZO transistors have potential applications in biochemical sensors and portable electronics.« less

  14. Installing the Unix Starlink Software

    NASA Astrophysics Data System (ADS)

    Bly, M. J.

    This note is the release note and installation instructions for the DEC Alpha AXP / Digital UNIX, Sun Sparc / Solaris v2.x, and Sun Sparc / SunOS 4.1.x versions of the Starlink Software Collection (USSC). You will be supplied with pre-built (and installed) versions on tape and will just need to copy the tape to disk to have a working version. The tapes (where appropriate) will contain in addition, copies of the NAG and MEMSYS libraries, and Tcl, Tk, Expect, Mosaic, TeX, Pine, Perl, Jed, Ispell, Ghostscript, LaXeX2html and Ftnchek for the relevant system. The Sun Sparc SunOS 4.1.x version of the USSC was frozen at USSC111 and no further updates are available. The instructions for installing the main section of the USSC may continue to be used for installing Sun Sparc SunOS 4.1.x version.

  15. 46 CFR 58.25-70 - Steering-gear control systems.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... MACHINERY AND RELATED SYSTEMS Steering Gear § 58.25-70 Steering-gear control systems. (a) Each power-driven... arranged so that one operation of the switch's lever automatically supplies power to a complete system and its associated power unit or units. This switch must be— (1) Operated by one lever; (2) Arranged so...

  16. 46 CFR 58.25-70 - Steering-gear control systems.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... MACHINERY AND RELATED SYSTEMS Steering Gear § 58.25-70 Steering-gear control systems. (a) Each power-driven... arranged so that one operation of the switch's lever automatically supplies power to a complete system and its associated power unit or units. This switch must be— (1) Operated by one lever; (2) Arranged so...

  17. CONTAMINATION OF PUBLIC GROUND WATER SUPPLIES BY SUPERFUND SITES

    EPA Science Inventory

    Multiple sources of contamination can affect ground water supplies, including municipal landfills, industrial operations, leaking underground storage tanks, septic tank systems, and prioritized uncontrolled hazardous waste sites known as “Superfund” sites. A review of Superfund R...

  18. 30 CFR 773.3 - Information collection.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... mining operations must respond to obtain a benefit. A Federal agency may not conduct or sponsor, and a... Clearance Officer, Room 202—SIB, 1951 Constitution Avenue, NW., Washington, DC 20240. [72 FR 68029, Dec. 3...

  19. 30 CFR 773.3 - Information collection.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... mining operations must respond to obtain a benefit. A Federal agency may not conduct or sponsor, and a... Clearance Officer, Room 202—SIB, 1951 Constitution Avenue, NW., Washington, DC 20240. [72 FR 68029, Dec. 3...

  20. 14 CFR 121.709 - Airworthiness release or aircraft log entry.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... aircraft is in condition for safe operation; and (3) Be signed by an authorized certificated mechanic or... mechanic or repairman constitutes that certification. [Doc. No. 6258, 29 FR 19226, Dec. 31, 1964, as...

  1. 14 CFR 121.709 - Airworthiness release or aircraft log entry.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... aircraft is in condition for safe operation; and (3) Be signed by an authorized certificated mechanic or... mechanic or repairman constitutes that certification. [Doc. No. 6258, 29 FR 19226, Dec. 31, 1964, as...

  2. 14 CFR 121.709 - Airworthiness release or aircraft log entry.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... aircraft is in condition for safe operation; and (3) Be signed by an authorized certificated mechanic or... mechanic or repairman constitutes that certification. [Doc. No. 6258, 29 FR 19226, Dec. 31, 1964, as...

  3. 14 CFR 121.709 - Airworthiness release or aircraft log entry.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... aircraft is in condition for safe operation; and (3) Be signed by an authorized certificated mechanic or... mechanic or repairman constitutes that certification. [Doc. No. 6258, 29 FR 19226, Dec. 31, 1964, as...

  4. 14 CFR 121.709 - Airworthiness release or aircraft log entry.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... aircraft is in condition for safe operation; and (3) Be signed by an authorized certificated mechanic or... mechanic or repairman constitutes that certification. [Doc. No. 6258, 29 FR 19226, Dec. 31, 1964, as...

  5. Development of Power Supply Management Module for Radio Signal Repeaters of Automatic Metering Reading System in Variable Solar Density Conditions

    NASA Astrophysics Data System (ADS)

    Kondratjevs, K.; Zabasta, A.; Selmanovs-Pless, V.

    2016-02-01

    In recent years, there has been significant research focus that revolves around harvesting and minimising energy consumption by wireless sensor network nodes. When a sensor node is depleted of energy, it becomes unresponsive and disconnected from the network that can significantly influence the performance of the whole network. The purpose of the present research is to create a power supply management module in order to provide stable operating voltage for autonomous operations of radio signal repeaters, sensors or gateways of WSN. The developed management module is composed of a solar panel, lithium battery and power supply management module. The novelty of the research is the management module, which ensures stable and uninterrupted operations of electronic equipment in various power supply modes in different situations, simultaneously ensuring energy protection and sustainability of the module components. The management module is able to provide power supply of 5 V for electronics scheme independently, without power interruption switching between power sources and power flows in different directions.

  6. Kanban system implementation in cardboard supply process (Case study: PT. Akebono Brake Astra Indonesia - Jakarta)

    NASA Astrophysics Data System (ADS)

    Laksono, Pringgo Widyo; Kusumawardani, Christina Ayu

    2017-11-01

    Continuous improvement is needed by every manufacturing company to optimize their production. One way to reach that goal is eliminating waste that occurs in company. In PT. Akebono Brake Astra Indonesia - Jakarta (AAIJ), there are seven "muda" (waste) that always strived to remove, such as muda transportation that occurs in the cardboard supply system made by the non-value movement of PIC in packing area to take cardboard from warehouse. This research use Kaizen theory to get rid of muda transportation by changing the cardboard supply system that were previously done manually by PIC of packing area become taken over by a towing operator and apply Kanban system to improving the cardboard supply system information by creating set up of Kanban system that produce Material and Information Chart (MIFC), Standardized Work Chart (SWC), calculation of Kanban population, and Work Instruction (WI). This research lead to improvement of cardboard supply process, clearer and more cyclic information flow in cardboard supply system, and reduction of cost due to saving of manpower.

  7. How Does the Supply Requisitioning Process Affect Average Customer Wait Time Onboard U.S. Navy Destroyers?

    DTIC Science & Technology

    2013-06-01

    17  D.  NAVAL TACTICAL COMMAND SUPPORT SYSTEM .........................17  1.  Operational Maintenance Management System–Next Generation...Management .......................................................................................21  4.  Method ...Business Administration MDT Mean Down Time MTBM Mean Time Between Maintenance NAVSUP Naval Supply Systems Command NC Not Carried NIS Not in Stock

  8. Orion is Taken From Ship & Put in Shipping Container

    NASA Image and Video Library

    2014-12-10

    The Orion crew module has been lowered and secured in the crew module transportation fixture at the Mole Pier at Naval Base San Diego in California. The fixture has been secured on the back of a flatbed truck and the cover is being lowered over the spacecraft. Orion is being prepared for the overland trip back to NASA's Kennedy Space Center in Florida. Orion was recovered from the Pacific Ocean after completing a two-orbit, four-and-a-half hour mission Dec. 5 to test systems critical to crew safety, including the launch abort system, the heat shield and the parachute system. NASA, the U.S. Navy and Lockheed Martin coordinated efforts to recover Orion. The Ground Systems Development and Operations Program led the recovery, offload and pre-transportation efforts.

  9. Orion is Taken From Ship & Put in Shipping Container

    NASA Image and Video Library

    2014-12-10

    The Orion crew module has been secured in the crew module transportation fixture at the Mole Pier at Naval Base San Diego in California. The fixture has been secured on the back of a flatbed truck and the cover has been lowered over the spacecraft. Orion is being prepared for the overland trip back to NASA's Kennedy Space Center in Florida. Orion was recovered from the Pacific Ocean after completing a two-orbit, four-and-a-half hour mission Dec. 5 to test systems critical to crew safety, including the launch abort system, the heat shield and the parachute system. NASA, the U.S. Navy and Lockheed Martin coordinated efforts to recover Orion. The Ground Systems Development and Operations Program led the recovery, offload and pre-transportation efforts.

  10. 300 Area dangerous waste tank management system: Compliance plan approach. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1996-03-01

    In its Dec. 5, 1989 letter to DOE-Richland (DOE-RL) Operations, the Washington State Dept. of Ecology requested that DOE-RL prepare ``a plant evaluating alternatives for storage and/or treatment of hazardous waste in the 300 Area...``. This document, prepared in response to that letter, presents the proposed approach to compliance of the 300 Area with the federal Resource Conservation and Recovery Act and Washington State`s Chapter 173-303 WAC, Dangerous Waste Regulations. It also contains 10 appendices which were developed as bases for preparing the compliance plan approach. It refers to the Radioactive Liquid Waste System facilities and to the radioactive mixedmore » waste.« less

  11. KSC-2014-4870

    NASA Image and Video Library

    2014-12-19

    CAPE CANAVERAL, Fla. -- Lockheed Martin Manager Jules Schneider speaks to members of the media during a viewing of NASA's Orion spacecraft at the Launch Abort System Facility at NASA's Kennedy Space Center in Florida. The spacecraft's cross-country return, a 2,700 mile road trip from Naval Base San Diego to Kennedy, sets the stage for in-depth analysis of data obtained during Orion's trip to space. It will provide engineers with detailed information on how the spacecraft fared during its two-orbit, 4.5-hour flight test, completed on Dec. 5. The Ground Systems Development and Operations Program led the recovery, offload and transportation efforts. For more information, visit www.nasa.gov/orion. Photo credit: NASA/Dimitri Gerondidakis

  12. KSC-2014-4871

    NASA Image and Video Library

    2014-12-19

    CAPE CANAVERAL, Fla. -- Lockheed Martin Manager Jules Schneider speaks to members of the media during a viewing of NASA's Orion spacecraft at the Launch Abort System Facility at NASA's Kennedy Space Center in Florida. The spacecraft's cross-country return, a 2,700 mile road trip from Naval Base San Diego to Kennedy, sets the stage for in-depth analysis of data obtained during Orion's trip to space. It will provide engineers with detailed information on how the spacecraft fared during its two-orbit, 4.5-hour flight test, completed on Dec. 5. The Ground Systems Development and Operations Program led the recovery, offload and transportation efforts. For more information, visit www.nasa.gov/orion. Photo credit: NASA/Dimitri Gerondidakis

  13. KSC-2014-4869

    NASA Image and Video Library

    2014-12-19

    CAPE CANAVERAL, Fla. -- Lockheed Martin Manager Jules Schneider speaks to members of the media during a viewing of NASA's Orion spacecraft at the Launch Abort System Facility at NASA's Kennedy Space Center in Florida. The spacecraft's cross-country return, a 2,700 mile road trip from Naval Base San Diego to Kennedy, sets the stage for in-depth analysis of data obtained during Orion's trip to space. It will provide engineers with detailed information on how the spacecraft fared during its two-orbit, 4.5-hour flight test, completed on Dec. 5. The Ground Systems Development and Operations Program led the recovery, offload and transportation efforts. For more information, visit www.nasa.gov/orion. Photo credit: NASA/Dimitri Gerondidakis

  14. KSC-2014-4865

    NASA Image and Video Library

    2014-12-19

    CAPE CANAVERAL, Fla. -- NASA's Orion spacecraft is viewed by members of the media at the Launch Abort System Facility at NASA's Kennedy Space Center in Florida. Kennedy's News Chief Mike Curie speaks to the media during the viewing opportunity. The spacecraft's cross-country return, a 2,700 mile road trip from Naval Base San Diego to Kennedy, sets the stage for in-depth analysis of data obtained during Orion's trip to space. It will provide engineers with detailed information on how the spacecraft fared during its two-orbit, 4.5-hour flight test, completed on Dec. 5. The Ground Systems Development and Operations Program led the recovery, offload and transportation efforts. For more information, visit www.nasa.gov/orion. Photo credit: NASA/Dimitri Gerondidakis

  15. WORKING PARK-FUEL CELL COMBINED HEAT AND POWER SYSTEM

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Allan Jones

    2003-09-01

    This report covers the aims and objectives of the project which was to design, install and operate a fuel cell combined heat and power (CHP) system in Woking Park, the first fuel cell CHP system in the United Kingdom. The report also covers the benefits that were expected to accrue from the work in an understanding of the full technology procurement process (including planning, design, installation, operation and maintenance), the economic and environmental performance in comparison with both conventional UK fuel supply and conventional CHP and the commercial viability of fuel cell CHP energy supply in the new deregulated energymore » markets.« less

  16. U.S. Electric System Operating Data

    EIA Publications

    EIA provides hourly electricity operating data, including actual and forecast demand, net generation, and the power flowing between electric systems. EIA's new U.S. Electric System Operating Data tool provides nearly real-time demand data, plus analysis and visualizations of hourly, daily, and weekly electricity supply and demand on a national and regional level for all of the 66 electric system balancing authorities that make up the U.S. electric grid.

  17. Supplying of Assembly Lines Using Train of Trucks

    NASA Astrophysics Data System (ADS)

    Čujan, Zdeněk; Fedorko, Gabriel

    2016-11-01

    The typical supply system conceptions, i.e. the concepts "Just-in-time" (JIT) and "Just-in-sequence" (JIS) are very important factors with regard to a fluent operation of the assembly lines. Therefore the contemporary intra plant transport systems are being replaced by a new kind of the transportation technology, namely by means of the trains of trucks. The trains of trucks are used in two possible operational modes: either with a driver or without driver (fully automated). The trucks of the logistic trains are also cheaper and they are able to carry a larger volume and mass of the material at once. There are reduced in this way not only the investment costs, but also the operational expenses.

  18. Citizen ’Cyber’ Airmen: Maintaining Ready and Proficient Cyberspace Operators in the Reserve Components

    DTIC Science & Technology

    2016-02-01

    Internet service providers and global supply chains, over which DOD has no direct authority to mitigate risk effectively. The global technology supply...cyberspace. CO are composed of the military, intelligence, and ordinary business operations of DOD in and through cyberspace. Cyberspace, while a global ...infrastructures, including the Internet , telecommunications networks, computer systems, and embedded processors and controllers, and the content that flows across

  19. Pumped two-phase heat transfer loop

    NASA Technical Reports Server (NTRS)

    Edelstein, Fred

    1988-01-01

    A pumped loop two-phase heat transfer system, operating at a nearly constant temperature throughout, includes several independently operating grooved capillary heat exchanger plates supplied with working fluid through independent flow modulation valves connected to a liquid supply line, a vapor line for collecting vapor from the heat exchangers, a condenser between the vapor and the liquid lines, and a fluid circulating pump between the condenser and the heat exchangers.

  20. Pumped two-phase heat transfer loop

    NASA Technical Reports Server (NTRS)

    Edelstein, Fred (Inventor)

    1987-01-01

    A pumped loop two-phase heat transfer system, operating at a nearly constant temperature throughout, includes a plurality of independently operating grooved capillary heat exchanger plates supplied with working fluid through independent flow modulation valves connected to a liquid supply line, a vapor line for collecting vapor from the heat exchangers, a condenser between the vapor and the liquid lines, and a fluid circulating pump between the condenser and the heat exchangers.

  1. Determining the Most Efficient and Cost-Effective Pumping Schemes for Treating Contaminated Aquifers

    DTIC Science & Technology

    1993-08-01

    of both surface water and groundwater, while some base-operated water-supply systems receive water from off-site municipal sources. To the extent...well field for municipal water supply, or a surface-water supply reservoir that is recharged by groundwater flow. As with plume stabilization, flow...waters is not addressed. In addition, the public rarely condones this method if the contaminated well supplies municipal or private drinking water. Natural

  2. Measured performance of filtration and ventilation systems for fine and ultrafine particles and ozone in an unoccupied modern California house.

    PubMed

    Singer, B C; Delp, W W; Black, D R; Walker, I S

    2017-07-01

    This study evaluated nine ventilation and filtration systems in an unoccupied 2006 house located 250 m downwind of the I-80 freeway in Sacramento, California. Systems were evaluated for reducing indoor concentrations of outdoor particles in summer and fall/winter, ozone in summer, and particles from stir-fry cooking. Air exchange rate was measured continuously. Energy use was estimated for year-round operation in California. Exhaust ventilation without enhanced filtration provided indoor PM 2.5 that was 70% lower than outdoors. Supply ventilation with MERV13 filtration provided slightly less protection, whereas supply MERV16 filtration reduced PM 2.5 by 97-98% relative to outdoors. Supply filtration systems used little energy but provided no benefits for indoor-generated particles. Systems with MERV13-16 filter in the recirculating heating and cooling unit (FAU) operating continuously or 20 min/h reduced PM 2.5 by 93-98%. Across all systems, removal percentages were higher for ultrafine particles and lower for black carbon, relative to PM 2.5 . Indoor ozone was 3-4% of outdoors for all systems except an electronic air cleaner that produced ozone. Filtration via the FAU or portable filtration units lowered PM 2.5 by 25-75% when operated over the hour following cooking. The energy for year-round operation of FAU filtration with an efficient blower motor was estimated at 600 kWh/year. © 2016 John Wiley & Sons A/S. Published by John Wiley & Sons Ltd.

  3. Measured performance of filtration and ventilation systems for fine and ultrafine particles and ozone in an unoccupied modern California house

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Singer, Brett C.; Delp, William W.; Black, Douglas R.

    This study evaluated nine ventilation and filtration systems in an unoccupied 2006 house located 250m downwind of the I-80 freeway in Sacramento, California. Systems were evaluated for reducing indoor concentrations of outdoor particles in summer and fall/winter, ozone in summer, and particles from stir-fry cooking. Air exchange rate was measured continuously. Energy use was estimated for year-round operation in California. Exhaust ventilation without enhanced filtration produced indoor PM 2.5 that was 70% lower than outdoors. Supply ventilation with MERV13 filtration provided slightly less protection whereas supply MERV16 filtration reduced PM 2.55 by 97-98% relative to outdoors. Supply filtration systems usedmore » little energy but provided no benefits for indoor-generated particles. Systems with MERV13-16 filters in the recirculating heating and cooling unit (FAU) operating continuously or 20 min/h reduced PM 2.5 by 93-98%. Across all systems, removal percentages were higher for ultrafine particles and lower for black carbon, relative to PM 2.5. Indoor ozone was 3-4% of outdoors for all systems except an electronic air cleaner that produced ozone. Filtration via the FAU or portable filtration units lowered PM 2.5 by 25-75% when operated over the hour following cooking. The energy for year-round operation of FAU filtration with an efficient blower motor was estimated at 600 kWh/year.« less

  4. Measured performance of filtration and ventilation systems for fine and ultrafine particles and ozone in an unoccupied modern California house

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Singer, B. C.; Delp, W. W.; Black, D. R.

    This study evaluated nine ventilation and filtration systems in an unoccupied 2006 house located 250 m downwind of the I-80 freeway in Sacramento, California. Systems were evaluated for reducing indoor concentrations of outdoor particles in summer and fall/winter, ozone in summer, and particles from stir-fry cooking. Air exchange rate was measured continuously. Energy use was estimated for year-round operation in California. Exhaust ventilation without enhanced filtration provided indoor PM 2.5 that was 70% lower than outdoors. Supply ventilation with MERV13 filtration provided slightly less protection, whereas supply MERV16 filtration reduced PM 2.5 by 97-98% relative to outdoors. Supply filtration systems usedmore » little energy but provided no benefits for indoor-generated particles. Systems with MERV13-16 fil ter in the recirculating heating and cooling unit (FAU) operating continuously or 20 min/h reduced PM 2.5 by 93-98%. Across all systems, removal percentages were higher for ultrafine particles and lower for black carbon, relative to PM 2.5 . Indoor ozone was 3-4% of outdoors for all systems except an electronic air cleaner that produced ozone. Filtration via the FAU or portable filtration units lowered PM 2.5 by 25-75% when operated over the hour following cooking. The energy for year-round operation of FAU filtration with an efficient blower motor was estimated at 600 kWh/year.« less

  5. Measured performance of filtration and ventilation systems for fine and ultrafine particles and ozone in an unoccupied modern California house

    DOE PAGES

    Singer, B. C.; Delp, W. W.; Black, D. R.; ...

    2016-12-05

    This study evaluated nine ventilation and filtration systems in an unoccupied 2006 house located 250 m downwind of the I-80 freeway in Sacramento, California. Systems were evaluated for reducing indoor concentrations of outdoor particles in summer and fall/winter, ozone in summer, and particles from stir-fry cooking. Air exchange rate was measured continuously. Energy use was estimated for year-round operation in California. Exhaust ventilation without enhanced filtration provided indoor PM 2.5 that was 70% lower than outdoors. Supply ventilation with MERV13 filtration provided slightly less protection, whereas supply MERV16 filtration reduced PM 2.5 by 97-98% relative to outdoors. Supply filtration systems usedmore » little energy but provided no benefits for indoor-generated particles. Systems with MERV13-16 fil ter in the recirculating heating and cooling unit (FAU) operating continuously or 20 min/h reduced PM 2.5 by 93-98%. Across all systems, removal percentages were higher for ultrafine particles and lower for black carbon, relative to PM 2.5 . Indoor ozone was 3-4% of outdoors for all systems except an electronic air cleaner that produced ozone. Filtration via the FAU or portable filtration units lowered PM 2.5 by 25-75% when operated over the hour following cooking. The energy for year-round operation of FAU filtration with an efficient blower motor was estimated at 600 kWh/year.« less

  6. 76 FR 58490 - Combined Notice of Filings #1

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-21

    ..., October 04, 2011. Docket Numbers: ER11-4186-001. Applicants: Wolverine Power Supply Cooperative, Inc., Midwest Independent Transmission System Operator, Inc. Description: Wolverine Power Supply Cooperative..., October 04, 2011. Docket Numbers: ER11-4510-000. Applicants: Pacific Power (Previously Pacificorp, PA...

  7. A high school is supplied with solar energy--Dallas, Texas

    NASA Technical Reports Server (NTRS)

    1981-01-01

    System preheats 100 percent of domestic hot water and supplies almost half of heating requirements for three story, concrete frame, brick building with basement. Final report includes details of installation, operation and maintenance, contract negotiation, and acceptance test plan.

  8. Loyola University, New Orleans, Louisiana solar energy system performance evaluation, February 1981 - June 1981

    NASA Astrophysics Data System (ADS)

    Welch, K. M.

    1981-09-01

    The Loyola University site is a student dormitory in New Orleans, Louisiana whose active solar energy system is designed to supply 52% of the hot water demand. The system is equipped with 4590 square feet of flat-plate collectors, a 5000-gallon water tank, auxiliary water supplied at high temperature and pressure from a central heating plant with a gas-fired boiler, and a differential controller that selects from 5 operating modes. System performance data are given, including the solar fraction, solar savings ratio, conventional fuel savings, system performance factor, and system coefficient of performance. The solar fraction is well below the design goal; this is attributed to great fluctuations in demand. Insolation, temperature, operation and solar energy utilization data are also presented. The performance of the collector, storage, and domestic hot water subsystems, the system operating energy, energy savings, and weather conditions are also evaluated. Appended are a system description, performance evaluation techniques and equations, site history, sensor technology, and typical monthly data.

  9. Macrootlocus, a CAD Design Tool for Feedback Control Systems

    DTIC Science & Technology

    1989-12-01

    var Form :DecForm; Str :DecStr; begin 125 Form.Style, :. FixedDecimal; Forrr.Digits :. 0; Num2Str(Form, 1, Str ); lntToStr :. Str ; end; { lntToStr...School Monterey, CA 93943 15. Hong-on Kim SMC2665 Naval Postgraduate School Monterey, CA 93943 16. Kang, Mung Hung SMC1375 Naval Postgraduate School

  10. 25 Years Later: A History of the McClellan-Kerr Arkansas River Navigation System in Arkansas

    DTIC Science & Technology

    1995-01-01

    and Clements, ’’Arkansas River ... Sediment Control," chap. 18, pp. 15-16; Ronald A. Antonino , "The Arkansas River Project," Civil Engineering (Dec...March 8, 1989. Secondary Sources Antonino , Ronald A. "The Arkansas River Project," Civil Engineering (Dec. 1969): 44- 49. Arnold, Morris S

  11. Global Combat Support System - Joint Increment 8 (GCSS-J Inc 8)

    DTIC Science & Technology

    2016-03-01

    Acquisition Executive DoD - Department of Defense DoDAF - DoD Architecture Framework FD - Full Deployment FDD - Full Deployment Decision FY - Fiscal...Estimate (Or Actual) Milestone B1 Mar 2014 Mar 2014 Milestone C1 Mar 2014 Mar 2014 Increment 8 FDD Dec 2018 Dec 2018 Increment 8 FD TBD TBD Memo 1

  12. Electromagnetic Compatibility of Devices on Hybrid Electromagnetic Components

    NASA Astrophysics Data System (ADS)

    Konesev, S. G.; Khazieva, R. T.; Kirillov, R. V.; Gainutdinov, I. Z.; Kondratyev, E. Y.

    2018-01-01

    There is a general tendency to reduce the weight and dimensions, the consumption of conductive and electrical insulating materials, increase the reliability and energy efficiency of electrical devices. In recent years, designers have been actively developing devices based on hybrid electromagnetic components (HEMC) such as inductive-capacitive converters (ICC), voltages pulse generators (VPG), secondary power supplies (SPS), capacitive storage devices (CSD), induction heating systems (IHS). Sources of power supplies of similar electrical devices contain, as a rule, links of increased frequency and function in key (pulse) modes, which leads to an increase in electromagnetic interference (EMI). Nonlinear and periodic (impulse) loads, non-sinusoidal (pulsation) of the electromotive force and nonlinearity of the internal parameters of the source and input circuits of consumers distort the shape of the input voltage lead to an increase in thermal losses from the higher harmonic currents, aging of the insulation, increase in the weight of the power supply filter units, resonance at higher harmonics. The most important task is to analyze the operation of electrotechnical devices based on HEMC from the point of view of creating EMIs and assessing their electromagnetic compatibility (EMC) with power supply systems (PSS). The article presents the results of research on the operation of an IHS, the operation principle of a secondary power supply source of which is based on the operation of a half-bridge autonomous inverter, the switching circuit of which is made in the form of a HEMC, called the «multifunctional integrated electromagnetic component»" (MIEC).

  13. Orion Flight Test Preview Briefing

    NASA Image and Video Library

    2014-11-06

    In the Kennedy Space Center’s Press Site auditorium, members of the news media are briefed on the upcoming Orion flight test. From left are: Rachel Kraft, NASA Public Affairs, Bill Hill, NASA deputy associate administrator for Exploration Systems Development, Mark Geyer, NASA Orion Program manager, Bryan Austin, Lockheed Martin mission manager, Jeremy Graeber, Operations Integration Branch of Ground Systems Development and Operations at Kennedy, and Ron Fortson, United Launch Alliance director of Mission Management. Mike Sarafin, NASA's lead flight director, participated by video from the Johnson Space Center. Orion is the exploration spacecraft designed to carry astronauts to destinations not yet explored by humans, including an asteroid and Mars. It will have emergency abort capability, sustain the crew during space travel and provide safe re-entry from deep space return velocities. The first unpiloted flight test of Orion is scheduled to launch Dec. 4, 2014 atop a United Launch Alliance Delta IV Heavy rocket, and in 2018 on NASA’s Space Launch System rocket.

  14. 49 CFR 225.15 - Accidents/incidents not to be reported.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... in or about living quarters not arising from the operation of a railroad; (c) Suicides as determined by a coroner or other public authority; or (d) Attempted suicides. [39 FR 43224, Dec. 11, 1974, as...

  15. 10 CFR 73.60 - Additional requirements for physical protection at nonpower reactors.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... nonpower reactors licensed to operate at or above a power level of 2 megawatts thermal. [38 FR 35430, Dec... OF PLANTS AND MATERIALS Physical Protection Requirements at Fixed Sites § 73.60 Additional...

  16. 10 CFR 73.60 - Additional requirements for physical protection at nonpower reactors.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... nonpower reactors licensed to operate at or above a power level of 2 megawatts thermal. [38 FR 35430, Dec... OF PLANTS AND MATERIALS Physical Protection Requirements at Fixed Sites § 73.60 Additional...

  17. 10 CFR 73.60 - Additional requirements for physical protection at nonpower reactors.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... nonpower reactors licensed to operate at or above a power level of 2 megawatts thermal. [38 FR 35430, Dec... OF PLANTS AND MATERIALS Physical Protection Requirements at Fixed Sites § 73.60 Additional...

  18. GSFC_20161209_2017-1682_028

    NASA Image and Video Library

    2016-12-09

    Representative Ted Yoho (R-FL) and staff visited Goddard on Dec 9, 2016 via invitation from Center Director Chris Scolese. District staff was updated on current work at Goddard and toured Hyperwall, James Webb Space Telescope, and Robotic Operations Center.

  19. GSFC_20161209_2017-1682_032

    NASA Image and Video Library

    2016-12-09

    Reprresentative Ted Yoho (R-FL) and staff visited Goddard on Dec 9, 2016 via invitation from Center Director Chris Scolese. District staff was updated on current work at Goddard and toured Hyperwall, James Webb Space Telescope and Robotic Operations Center.

  20. SIG: a general-purpose signal processing program

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lager, D.; Azevedo, S.

    1986-02-01

    SIG is a general-purpose signal processing, analysis, and display program. Its main purpose is to perform manipulations on time- and frequency-domain signals. It also accommodates other representations for data such as transfer function polynomials. Signal processing operations include digital filtering, auto/cross spectral density, transfer function/impulse response, convolution, Fourier transform, and inverse Fourier transform. Graphical operations provide display of signals and spectra, including plotting, cursor zoom, families of curves, and multiple viewport plots. SIG provides two user interfaces with a menu mode for occasional users and a command mode for more experienced users. Capability exits for multiple commands per line, commandmore » files with arguments, commenting lines, defining commands, automatic execution for each item in a repeat sequence, etc. SIG is presently available for VAX(VMS), VAX (BERKELEY 4.2 UNIX), SUN (BERKELEY 4.2 UNIX), DEC-20 (TOPS-20), LSI-11/23 (TSX), and DEC PRO 350 (TSX). 4 refs., 2 figs.« less

  1. Space Operations Center system analysis. Volume 3, book 2: SOC system definition report, revision A

    NASA Technical Reports Server (NTRS)

    1982-01-01

    The Space Operations Center (SOC) orbital space station program operations are described. A work breakdown structure for the general purpose support equipment, construction and transportation support, and resupply and logistics support systems is given. The basis for the design of each element is presented, and a mass estimate for each element supplied. The SOC build-up operation, construction, flight support, and satellite servicing operations are described. Detailed programmatics and cost analysis are presented.

  2. Marshall Installs Receiving Antenna for Next-Generation Weather Satellites

    NASA Image and Video Library

    2016-12-16

    Technicians assemble a hefty segment of a new antenna system in this 30-second time-lapse video captured Dec. 16 at NASA's Marshall Space Flight Center. The high-performance ground station is designed to receive meteorological and space weather data from instruments flown on the National Oceanic and Atmospheric Administration's new, game-changing Geostationary Operational Environmental Satellite series. The six-meter dish antenna near Building 4316 expands the capacity of Marshall’s Earth Science Office to use real-time GOES observations for studies of Earth and to deliver new forecasting, warning and disaster response tools to partners around the world. (NASA/MSFC)

  3. STS-35 MS Hoffman operates ASTRO-1 MPC on OV-102's aft flight deck

    NASA Image and Video Library

    1990-12-10

    STS035-12-015 (2-11 Dec 1990) --- Astronaut Jeffrey A. Hoffman, STS 35 mission specialist, uses a manual pointing controller (MPC) for the Astro-1 mission's Instrument Pointing System (IPS). By using the MPC, Hoffman and other crewmembers on Columbia's aft flight deck, were able to command the IPS, located in the cargo bay, to record astronomical data. Hoffman is serving the "Blue" shift which complemented the currently sleeping "Red" shift of crewmembers as the mission collected scientific data on a 24-hour basis. The scene was photographed with a 35mm camera.

  4. KSC-07pd3642

    NASA Image and Video Library

    2007-12-14

    KENNEDY SPACE CENTER, FLA. -- In the cryogenic test bed facility at NASA's Kennedy Space Center, technicians monitor readings during a test exposing Time Domain Reflectometry, or TDR, instrumentation to "wet" super-cold temperatures for identifying the signature of a cryogenic environment and calibrating the TDR equipment. The equipment will be used at the launch pad to test a procedure identical to a tanking test on space shuttle Atlantis' external tank planned for Dec. 18. The shuttle's planned launches on Dec. 6 and Dec. 9 were postponed because of false readings from the part of the engine cut-off, or ECO, sensor system that monitors the liquid hydrogen section of the tank. The liftoff date from NASA's Kennedy Space Center, Florida, is now targeted for Jan. 10, depending on the resolution of the problem in the fuel sensor system. Photo credit: NASA/Kim Shiflett

  5. Development of the FITS tools package for multiple software environments

    NASA Technical Reports Server (NTRS)

    Pence, W. D.; Blackburn, J. K.

    1992-01-01

    The HEASARC is developing a package of general purpose software for analyzing data files in FITS format. This paper describes the design philosophy which makes the software both machine-independent (it runs on VAXs, Suns, and DEC-stations) and software environment-independent. Currently the software can be compiled and linked to produce IRAF tasks, or alternatively, the same source code can be used to generate stand-alone tasks using one of two implementations of a user-parameter interface library. The machine independence of the software is achieved by writing the source code in ANSI standard Fortran or C, using the machine-independent FITSIO subroutine interface for all data file I/O, and using a standard user-parameter subroutine interface for all user I/O. The latter interface is based on the Fortran IRAF Parameter File interface developed at STScI. The IRAF tasks are built by linking to the IRAF implementation of this parameter interface library. Two other implementations of this parameter interface library, which have no IRAF dependencies, are now available which can be used to generate stand-alone executable tasks. These stand-alone tasks can simply be executed from the machine operating system prompt either by supplying all the task parameters on the command line or by entering the task name after which the user will be prompted for any required parameters. A first release of this FTOOLS package is now publicly available. The currently available tasks are described, along with instructions on how to obtain a copy of the software.

  6. Future supply chains enabled by continuous processing--opportunities and challenges. May 20-21, 2014 Continuous Manufacturing Symposium.

    PubMed

    Srai, Jagjit Singh; Badman, Clive; Krumme, Markus; Futran, Mauricio; Johnston, Craig

    2015-03-01

    This paper examines the opportunities and challenges facing the pharmaceutical industry in moving to a primarily "continuous processing"-based supply chain. The current predominantly "large batch" and centralized manufacturing system designed for the "blockbuster" drug has driven a slow-paced, inventory heavy operating model that is increasingly regarded as inflexible and unsustainable. Indeed, new markets and the rapidly evolving technology landscape will drive more product variety, shorter product life-cycles, and smaller drug volumes, which will exacerbate an already unsustainable economic model. Future supply chains will be required to enhance affordability and availability for patients and healthcare providers alike despite the increased product complexity. In this more challenging supply scenario, we examine the potential for a more pull driven, near real-time demand-based supply chain, utilizing continuous processing where appropriate as a key element of a more "flow-through" operating model. In this discussion paper on future supply chain models underpinned by developments in the continuous manufacture of pharmaceuticals, we have set out; The significant opportunities to moving to a supply chain flow-through operating model, with substantial opportunities in inventory reduction, lead-time to patient, and radically different product assurance/stability regimes. Scenarios for decentralized production models producing a greater variety of products with enhanced volume flexibility. Production, supply, and value chain footprints that are radically different from today's monolithic and centralized batch manufacturing operations. Clinical trial and drug product development cost savings that support more rapid scale-up and market entry models with early involvement of SC designers within New Product Development. The major supply chain and industrial transformational challenges that need to be addressed. The paper recognizes that although current batch operational performance in pharma is far from optimal and not necessarily an appropriate end-state benchmark for batch technology, the adoption of continuous supply chain operating models underpinned by continuous production processing, as full or hybrid solutions in selected product supply chains, can support industry transformations to deliver right-first-time quality at substantially lower inventory profiles. © 2015 Wiley Periodicals, Inc. and the American Pharmacists Association.

  7. Design and evaluation of a 3 million DN series-hybrid thrust bearing. [stability tests and fatigue tests

    NASA Technical Reports Server (NTRS)

    Scibbe, H. W.; Winn, L. W.; Eusepi, M.

    1976-01-01

    The bearing, consisting of a 150-mm ball bearing and a centrifugally actuated, conical, fluid-film bearing, was fatigue tested. Test conditions were representative of a mainshaft ball bearing in a gas turbine engine operating at maximum thrust load to simulate aircraft takeoff conditions. Tests were conducted up to 16000 rpm and at this speed an axial load of 15568 newtons (3500 lb) was safely supported by the hybrid bearing system. Through the series-hybrid bearing principle, the effective ball bearing speed was reduced to approximately one-half of the shaft speed. It was concluded that a speed reduction of this magnitude results in a ten-fold increase in the ball bearing fatigue life. A successful evaluation of fluid-film bearing lubricant supply failure was performed repeatedly at an operating speed of 10,000 rpm. A complete and smooth changeover to full-scale ball bearing operation was effected when the oil supply to the fluid-film bearing was cut off. Reactivation of the fluid-film oil supply system resulted in a flawless return to the original mode of hybrid operation.

  8. TRASYS - THERMAL RADIATION ANALYZER SYSTEM (DEC VAX VERSION WITH NASADIG)

    NASA Technical Reports Server (NTRS)

    Anderson, G. E.

    1994-01-01

    The Thermal Radiation Analyzer System, TRASYS, is a computer software system with generalized capability to solve the radiation related aspects of thermal analysis problems. TRASYS computes the total thermal radiation environment for a spacecraft in orbit. The software calculates internode radiation interchange data as well as incident and absorbed heat rate data originating from environmental radiant heat sources. TRASYS provides data of both types in a format directly usable by such thermal analyzer programs as SINDA/FLUINT (available from COSMIC, program number MSC-21528). One primary feature of TRASYS is that it allows users to write their own driver programs to organize and direct the preprocessor and processor library routines in solving specific thermal radiation problems. The preprocessor first reads and converts the user's geometry input data into the form used by the processor library routines. Then, the preprocessor accepts the user's driving logic, written in the TRASYS modified FORTRAN language. In many cases, the user has a choice of routines to solve a given problem. Users may also provide their own routines where desirable. In particular, the user may write output routines to provide for an interface between TRASYS and any thermal analyzer program using the R-C network concept. Input to the TRASYS program consists of Options and Edit data, Model data, and Logic Flow and Operations data. Options and Edit data provide for basic program control and user edit capability. The Model data describe the problem in terms of geometry and other properties. This information includes surface geometry data, documentation data, nodal data, block coordinate system data, form factor data, and flux data. Logic Flow and Operations data house the user's driver logic, including the sequence of subroutine calls and the subroutine library. Output from TRASYS consists of two basic types of data: internode radiation interchange data, and incident and absorbed heat rate data. The flexible structure of TRASYS allows considerable freedom in the definition and choice of solution method for a thermal radiation problem. The program's flexible structure has also allowed TRASYS to retain the same basic input structure as the authors update it in order to keep up with changing requirements. Among its other important features are the following: 1) up to 3200 node problem size capability with shadowing by intervening opaque or semi-transparent surfaces; 2) choice of diffuse, specular, or diffuse/specular radiant interchange solutions; 3) a restart capability that minimizes recomputing; 4) macroinstructions that automatically provide the executive logic for orbit generation that optimizes the use of previously completed computations; 5) a time variable geometry package that provides automatic pointing of the various parts of an articulated spacecraft and an automatic look-back feature that eliminates redundant form factor calculations; 6) capability to specify submodel names to identify sets of surfaces or components as an entity; and 7) subroutines to perform functions which save and recall the internodal and/or space form factors in subsequent steps for nodes with fixed geometry during a variable geometry run. There are two machine versions of TRASYS v27: a DEC VAX version and a Cray UNICOS version. Both versions require installation of the NASADIG library (MSC-21801 for DEC VAX or COS-10049 for CRAY), which is available from COSMIC either separately or bundled with TRASYS. The NASADIG (NASA Device Independent Graphics Library) plot package provides a pictorial representation of input geometry, orbital/orientation parameters, and heating rate output as a function of time. NASADIG supports Tektronix terminals. The CRAY version of TRASYS v27 is written in FORTRAN 77 for batch or interactive execution and has been implemented on CRAY X-MP and CRAY Y-MP series computers running UNICOS. The standard distribution medium for MSC-21959 (CRAY version without NASADIG) is a 1600 BPI 9-track magnetic tape in UNIX tar format. The standard distribution medium for COS-10040 (CRAY version with NASADIG) is a set of two 6250 BPI 9-track magnetic tapes in UNIX tar format. Alternate distribution media and formats are available upon request. The DEC VAX version of TRASYS v27 is written in FORTRAN 77 for batch execution (only the plotting driver program is interactive) and has been implemented on a DEC VAX 8650 computer under VMS. Since the source codes for MSC-21030 and COS-10026 are in VAX/VMS text library files and DEC Command Language files, COSMIC will only provide these programs in the following formats: MSC-21030, TRASYS (DEC VAX version without NASADIG) is available on a 1600 BPI 9-track magnetic tape in VAX BACKUP format (standard distribution medium) or in VAX BACKUP format on a TK50 tape cartridge; COS-10026, TRASYS (DEC VAX version with NASADIG), is available in VAX BACKUP format on a set of three 6250 BPI 9-track magnetic tapes (standard distribution medium) or a set of three TK50 tape cartridges in VAX BACKUP format. TRASYS was last updated in 1993.

  9. TRASYS - THERMAL RADIATION ANALYZER SYSTEM (DEC VAX VERSION WITHOUT NASADIG)

    NASA Technical Reports Server (NTRS)

    Vogt, R. A.

    1994-01-01

    The Thermal Radiation Analyzer System, TRASYS, is a computer software system with generalized capability to solve the radiation related aspects of thermal analysis problems. TRASYS computes the total thermal radiation environment for a spacecraft in orbit. The software calculates internode radiation interchange data as well as incident and absorbed heat rate data originating from environmental radiant heat sources. TRASYS provides data of both types in a format directly usable by such thermal analyzer programs as SINDA/FLUINT (available from COSMIC, program number MSC-21528). One primary feature of TRASYS is that it allows users to write their own driver programs to organize and direct the preprocessor and processor library routines in solving specific thermal radiation problems. The preprocessor first reads and converts the user's geometry input data into the form used by the processor library routines. Then, the preprocessor accepts the user's driving logic, written in the TRASYS modified FORTRAN language. In many cases, the user has a choice of routines to solve a given problem. Users may also provide their own routines where desirable. In particular, the user may write output routines to provide for an interface between TRASYS and any thermal analyzer program using the R-C network concept. Input to the TRASYS program consists of Options and Edit data, Model data, and Logic Flow and Operations data. Options and Edit data provide for basic program control and user edit capability. The Model data describe the problem in terms of geometry and other properties. This information includes surface geometry data, documentation data, nodal data, block coordinate system data, form factor data, and flux data. Logic Flow and Operations data house the user's driver logic, including the sequence of subroutine calls and the subroutine library. Output from TRASYS consists of two basic types of data: internode radiation interchange data, and incident and absorbed heat rate data. The flexible structure of TRASYS allows considerable freedom in the definition and choice of solution method for a thermal radiation problem. The program's flexible structure has also allowed TRASYS to retain the same basic input structure as the authors update it in order to keep up with changing requirements. Among its other important features are the following: 1) up to 3200 node problem size capability with shadowing by intervening opaque or semi-transparent surfaces; 2) choice of diffuse, specular, or diffuse/specular radiant interchange solutions; 3) a restart capability that minimizes recomputing; 4) macroinstructions that automatically provide the executive logic for orbit generation that optimizes the use of previously completed computations; 5) a time variable geometry package that provides automatic pointing of the various parts of an articulated spacecraft and an automatic look-back feature that eliminates redundant form factor calculations; 6) capability to specify submodel names to identify sets of surfaces or components as an entity; and 7) subroutines to perform functions which save and recall the internodal and/or space form factors in subsequent steps for nodes with fixed geometry during a variable geometry run. There are two machine versions of TRASYS v27: a DEC VAX version and a Cray UNICOS version. Both versions require installation of the NASADIG library (MSC-21801 for DEC VAX or COS-10049 for CRAY), which is available from COSMIC either separately or bundled with TRASYS. The NASADIG (NASA Device Independent Graphics Library) plot package provides a pictorial representation of input geometry, orbital/orientation parameters, and heating rate output as a function of time. NASADIG supports Tektronix terminals. The CRAY version of TRASYS v27 is written in FORTRAN 77 for batch or interactive execution and has been implemented on CRAY X-MP and CRAY Y-MP series computers running UNICOS. The standard distribution medium for MSC-21959 (CRAY version without NASADIG) is a 1600 BPI 9-track magnetic tape in UNIX tar format. The standard distribution medium for COS-10040 (CRAY version with NASADIG) is a set of two 6250 BPI 9-track magnetic tapes in UNIX tar format. Alternate distribution media and formats are available upon request. The DEC VAX version of TRASYS v27 is written in FORTRAN 77 for batch execution (only the plotting driver program is interactive) and has been implemented on a DEC VAX 8650 computer under VMS. Since the source codes for MSC-21030 and COS-10026 are in VAX/VMS text library files and DEC Command Language files, COSMIC will only provide these programs in the following formats: MSC-21030, TRASYS (DEC VAX version without NASADIG) is available on a 1600 BPI 9-track magnetic tape in VAX BACKUP format (standard distribution medium) or in VAX BACKUP format on a TK50 tape cartridge; COS-10026, TRASYS (DEC VAX version with NASADIG), is available in VAX BACKUP format on a set of three 6250 BPI 9-track magnetic tapes (standard distribution medium) or a set of three TK50 tape cartridges in VAX BACKUP format. TRASYS was last updated in 1993.

  10. Room Temperature Curing Resin Systems for Graphite/Epoxy Composite Repair.

    DTIC Science & Technology

    1979-12-01

    ROOM TEMPERATURE CURING RESIN SYSTEMS FOR GRAPHITE/EPOXY COMPOS--ETC(UI DEC 79 0 J CRABTREE N62269-79-C-G224 UNCLASSIFIE O80-46 NADC -781 1-6 NL END...Room Temperature Curing Resin Sys-U3 linal for Graphite/Epoxy Composite Repair •.Dec *79 NOR- -46h: V111IT NUM8ER(s) 4362269-79- ,722 S. PERFORMING...repair, composite repair room temperature cure resin , moderate temperature cure resins , epoxies, adhesives, vinyl eater polymers, anaerobic curing polymers

  11. The Integration of the Competition in Contracting Act of 1984 in Systems Acquisition.

    DTIC Science & Technology

    1986-04-01

    Thomas L. "Mechanized Contract Document Preparation and Abstract System." §3 FMS. 7-9 Dec 83. p.18-22 . 5. Brechtel, Donald L., Capt, USAF, Brost ...and Momentum." Government Executive. Mar 85. p. 16+. 22. Roeder, George L. "Computer Aided Source Selection." 8__R. 7-9 Dec 83. p. 214-216. 23...Competition Advocacy Office. Andrews AFB. telecon. 12 Nov 85. B. RELATED SOURCES Articles and Periodicals Coburn, George M. "The New Bid Protest Remedies

  12. Energy and water quality management systems for water utility's operations: a review.

    PubMed

    Cherchi, Carla; Badruzzaman, Mohammad; Oppenheimer, Joan; Bros, Christopher M; Jacangelo, Joseph G

    2015-04-15

    Holistic management of water and energy resources is critical for water utilities facing increasing energy prices, water supply shortage and stringent regulatory requirements. In the early 1990s, the concept of an integrated Energy and Water Quality Management System (EWQMS) was developed as an operational optimization framework for solving water quality, water supply and energy management problems simultaneously. Approximately twenty water utilities have implemented an EWQMS by interfacing commercial or in-house software optimization programs with existing control systems. For utilities with an installed EWQMS, operating cost savings of 8-15% have been reported due to higher use of cheaper tariff periods and better operating efficiencies, resulting in the reduction in energy consumption of ∼6-9%. This review provides the current state-of-knowledge on EWQMS typical structural features and operational strategies and benefits and drawbacks are analyzed. The review also highlights the challenges encountered during installation and implementation of EWQMS and identifies the knowledge gaps that should motivate new research efforts. Copyright © 2015 Elsevier Ltd. All rights reserved.

  13. Planar Monolithic Schottky Varactor Diode Millimeter-Wave Frequency Multipliers

    DTIC Science & Technology

    1992-06-01

    wave applications", IEEE Trans on Microwave Theory and Tech., vol. 39, no. 12, Dec. 1991 , pp. 1964-1971. A copy of this paper is 35 included in...Watts to Bulky 1991 spectral HV DC Power line Pwr Very Inguscio varies Massive 1986 with Vac.:um line Very low Gas noise Supply Ledatron Up to 1 W at...PULSED Band up to 1985 HV DC 10 GHz Massive Pwr Magnetic V?4MA > 100 GHz > 1 Watt Wide Cooling Research Quasi- McGruer Theory Theory Band Planar 1991

  14. CDR Brown on middeck

    NASA Image and Video Library

    1999-12-20

    S103-E-5007 (20 December 1999) --- Astronaut Curtis L. Brown, mission commander, retrieves supplies from a mid deck stowage locker onboard the Space Shuttle Discovery. He and six other astronauts will spend a great deal of time later in the week performing a variety of service tasks on the Hubble Space Telescope (HST). As commander of the mission, Brown will remain inside Discovery while several of the other crew members will perform service tasks on HST. The photo was taken with an electronic still camera (ESC) at 16:12:27 GMT, Dec. 20, 1999.

  15. Space Station Crew Bids Farewell to U.S. Commercial Cargo Spaceship

    NASA Image and Video Library

    2017-12-06

    Aboard the International Space Station, Expedition 53 Flight Engineers Mark Vande Hei and Joe Acaba of NASA used the Canadian-built robotic arm to release the Orbital ATK Cygnus resupply spacecraft three weeks after its arrival to bring some three tons of supplies and experiments to the orbital complex. Dubbed the "SS Gene Cernan," the Cygnus cargo ship will remain in orbit for almost two weeks conducting engineering tests before it is deorbited on Dec. 18 to burn up harmlessly in the Earth's atmosphere over the Pacific Ocean.

  16. Isolated thermocouple amplifier system for stirred fixed-bed gasifier

    DOEpatents

    Fasching, George E.

    1992-01-01

    A sensing system is provided for determining the bed temperature profile of the bed of a stirred, fixed-bed gasifier including a plurality of temperature sensors for sensing the bed temperature at different levels, a transmitter for transmitting data based on the outputs of the sensors to a remote operator's station, and a battery-based power supply. The system includes an isolation amplifier system comprising a plurality of isolation amplifier circuits for amplifying the outputs of the individual sensors. The isolation amplifier circuits each comprise an isolation operational amplifier connected to a sensor; a first "flying capacitor" circuit for, in operation, controlling the application of power from the power supply to the isolation amplifier; an output sample and hold circuit connected to the transmitter; a second "flying capacitor" circuit for, in operation, controlling the transfer of the output of the isolation amplifier to the sample and hold circuit; and a timing and control circuit for activating the first and second capacitor circuits in a predetermined timed sequence.

  17. Coal slurry fuel supply and purge system

    DOEpatents

    McDowell, Robert E.; Basic, Steven L.; Smith, Russel M.

    1994-01-01

    A coal slurry fuel supply and purge system for a locomotive engines is disclosed which includes a slurry recirculation path, a stand-by path for circulating slurry during idle or states of the engine when slurry fuel in not required by the engine, and an engine header fluid path connected to the stand-by path, for supplying and purging slurry fuel to and from fuel injectors. A controller controls the actuation of valves to facilitate supply and purge of slurry to and from the fuel injectors. A method for supplying and purging coal slurry in a compression ignition engine is disclosed which includes controlling fluid flow devices and valves in a plurality of fluid paths to facilitate continuous slurry recirculation and supply and purge of or slurry based on the operating state of the engine.

  18. Plasma characteristics of argon glow discharge produced by AC power supply operating at low frequencies

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kongpiboolkid, Watcharapon; Mongkolnavin, Rattachat; Plasma Technology and Nuclear Fusion Research Unit, Chulalongkorn University, Bangkok

    2015-04-24

    Non-thermal properties of Argon glow discharge operating with various operating pressures were measured and presented in this work. The Argon plasma is produced by a parallel conducting electrodes coupling with a high voltage AC power supply. The power supply can generate high AC voltage at various frequencies. The frequencies for the operation are in the range of a few kHz. The system is capable of generating electric field between the two metal electrodes discharge system. The characteristics of plasma produced were measured by optical emission spectroscopy (OES) technique where electron temperature (T{sub e}) and electron number density (n{sub e}) canmore » be determined by line intensity ratio method. The value of electron number density was then determined from the Saha-Eggert equation. Our results show that the electron number density of the discharge obtained is of the order of 10{sup −17} − 10{sup −18} m{sup −3} where the electron temperature is between 1.00−2.00 eV for various operating frequencies used which are in good agreement with similar results published earlier.« less

  19. Knowledge Operation Capability Evaluation Model and Strategic Orientation of Supply Chain: Exploratory Research Based on View of Ecology

    NASA Astrophysics Data System (ADS)

    Zhou, Wen-Yong; Song, Ze-Qian

    The competitiveness of Supply Chain (SC) correlates intimately with its knowledge operation (KO). In order to realize better assessment value, this paper constructed an evaluation framework on knowledge operation of SC and a detailed index system. According to theory of ecology, expounded the evaluation orientation and future research direction from view of comprehensiveness and adaptability. Additionally, a case about Toyota recall-gate was analyzed. Through research, it provides two dimensions of results evaluating orientation which may help enterprise make right decision upon SC.

  20. Fluid-bed air-supply system

    DOEpatents

    Atabay, Keramettin

    1979-01-01

    The air-supply system for a fluidized-bed furnace includes two air conduits for the same combustion zone. The conduits feed separate sets of holes in a distributor plate through which fluidizing air flows to reach the bed. During normal operation, only one conduit and set of holes is used, but the second conduit and set of holes is employed during start-up.

  1. Ada technology support for NASA-GSFC

    NASA Technical Reports Server (NTRS)

    1986-01-01

    Utilization of the Ada programming language and environments to perform directorate functions was reviewed. The Mission and Data Operations Directorate Network (MNET) conversion effort was chosen as the first task for evaluation and assistance. The MNET project required the rewriting of the existing Network Control Program (NCP) in the Ada programming language. The DEC Ada compiler running on the VAX under WMS was used for the initial development efforts. Stress tests on the newly delivered version of the DEC Ada compiler were performed. The new Alsys Ada compiler was purchased for the IBM PC AT. A prevalidated version of the compiler was obtained. The compiler was then validated.

  2. GT-7 RECOVERY

    NASA Image and Video Library

    1965-12-18

    S65-61830 (18 Dec. 1965) --- Astronauts James A. Lovell Jr. (left), Gemini-7 pilot, and Frank Borman, command pilot, are shown just after they arrived aboard the aircraft carrier USS Wasp. Greeting the astronauts are Donald Stullken (at Lovell's right), Recovery Operations Branch, Landing and Recovery Division, Dr. Howard Minners (standing beside Borman), Flight Medicine Branch, Center Medical Office, Manned Spacecraft Center, and Bennett James (standing behind Borman), a NASA Public Affairs Officer. The National Aeronautics and Space Administration's Gemini-7 spacecraft splashed down in the western Atlantic recovery area at 9:05 a.m. (EST), Dec. 18, 1965, to conclude a record-breaking 14-day mission in space. Photo credit: NASA

  3. A Wireless Self-Powered Urinary Incontinence Sensor System

    NASA Astrophysics Data System (ADS)

    Tanaka, Ami; Utsunomiya, Fumiyasu; Douseki, Takakuni

    A self-powered urinary incontinence sensor system consisting of a urine-activated coin battery and a wireless transmitter has been developed as an application for wireless biosensor networks. The urine-activated battery makes possible both the sensing of urine leakage and self-powered operation. An intermittent power-supply circuit that uses an electric double-layer capacitor (EDLC) with a small internal resistance suppresses the supply voltage drop due to the large internal resistance of the battery. This circuit and a 1-V surface acoustic wave (SAW) oscillator reduce the power dissipation of a wireless transmitter. The SAW oscillator quickly responds to the on-off control of the power supply, which is suitable for intermittent operation. To verify the effectiveness of the circuit scheme, the authors fabricated a prototype sensor system. When the volume of urine is 0.2 ml, the battery outputs a voltage of over 1.3 V; and the sensor system can transmit signals over a distance of 5 m.

  4. Shuttle cryogenic supply system optimization study

    NASA Technical Reports Server (NTRS)

    1971-01-01

    Technical information on different cryogenic supply systems is presented for selecting representative designs. Parametric data and sensitivity studies, and an evaluation of related technology status are included. An integrated mathematical model for hardware program support was developed. The life support system, power generation, and propellant supply are considered. The major study conclusions are the following: Optimum integrated systems tend towards maximizing liquid storage. Vacuum jacketing of tanks is a major effect on integrated systems. Subcritical storage advantages over supercritical storage decrease as the quantity of propellant or reactant decreases. Shuttle duty cycles are not severe. The operational mode has a significant effect on reliability. Components are available for most subsystem applications. Subsystems and components require a minimum amount of technology development.

  5. Control system for thermoelectric refrigerator

    NASA Technical Reports Server (NTRS)

    Nelson, John L. (Inventor); Criscuolo, Lance (Inventor); Gilley, Michael D. (Inventor); Park, Brian V. (Inventor)

    1996-01-01

    Apparatus including a power supply (202) and control system is provided for maintaining the temperature within an enclosed structure (40) using thermoelectric devices (92). The apparatus may be particularly beneficial for use with a refrigerator (20) having superinsulation materials (46) and phase change materials (112) which cooperate with the thermoelectric device (92) to substantially enhance the overall operating efficiency of the refrigerator (20). The electrical power supply (202) and control system allows increasing the maximum power capability of the thermoelectric device (92) in response to increased heat loads within the refrigerator (20). The electrical power supply (202) and control system may also be used to monitor the performance of the cooling system (70) associated with the refrigerator (20).

  6. Assessment of RFID Investment in the Military Logistics Systems Through The Cost of Ownership Model (COO)

    DTIC Science & Technology

    2010-03-01

    managers seek ways to increase the efficiency of their organizations by improving their logistics operations . According to Logistics Today journal ...S. (2009). RFID Adoption by Indian Retailers: An Exploratory Study. The Icfai University Journal of Supply Chain Management , 6 (1), 60-77...and will continue to be one of the hot topics in operations and supply chain management . It will potentially receive widespread adoption in the long

  7. Source Water Management for Disinfection By-Product Control using New York City's Operations Support Tool and On-Line Monitoring

    NASA Astrophysics Data System (ADS)

    Weiss, W. J.; Becker, W.; Schindler, S.

    2012-12-01

    The United States Environmental Protection Agency's 2006 Stage 2 Disinfectant / Disinfection Byproduct Rule (DBPR) for finished drinking waters is intended to reduce overall DBP levels by limiting the levels of total trihalomethanes (TTHM) and five of the haloacetic acids (HAA5). Under Stage 2, maximum contaminant levels (MCLs), 80 μg/L for TTHM and 60 μg/L for HAA5, are based on a locational running annual average for individual sites instead of as the system-wide quarterly running annual average of the Stage 1 DBPR. This means compliance will have to be met at sampling locations of peak TTHM and HAA5 concentrations rather than an average across the entire system. Compliance monitoring under the Stage 2 DBPR began on April 1, 2012. The New York City (NYC) Department of Environmental Protection (DEP) began evaluating potential impacts of the Stage 2 DBPR on NYC's unfiltered water supply in 2002 by monitoring TTHM and HAA5 levels at various locations throughout the distribution system. Initial monitoring indicated that HAA5 levels could be of concern in the future, with the potential to intermittently violate the Stage 2 DBPR at specific locations, particularly those with high water age. Because of the uncertainty regarding the long-term prospect for compliance, DEP evaluated alternatives to ensure compliance, including operational changes (reducing chlorine dose, changing flow configurations to minimize water age, altering pH, altering source water withdrawals); changing the residual disinfectant from free chlorine to chloramines; and engineered treatment alternatives. This paper will discuss the potential for using DEP's Operations Support Tool (OST) and enhanced reservoir monitoring to support optimization of source water withdrawals to minimize finished water DBP levels. The OST is a state-of-the-art decision support system (DSS) to provide computational and predictive support for water supply operations and planning. It incorporates a water supply system simulation model (OASIS, HydroLogics, Inc.), reservoir water quality models, a near real-time monitoring network, and hydrologic forecasts to provide analytical support for both long-term planning and near-term operations. The OST helps managers and operators balance multiple objectives, including water supply reliability, water quality, and environmental and community release objectives. This paper will describe the results of initial testing to evaluate the potential to reduce DBP levels by managing source water withdrawals to minimize the transport of natural organic matter (NOM) precursors from upper reservoirs. Operating rules were developed that take advantage of selective withdrawal capabilities at some upstate reservoirs and the inherent flexibility of the overall water supply system, seeking to minimize DBPs within the larger framework of water supply, water quality, environmental, and regulatory objectives. The results demonstrated that there is substantial flexibility within the system to manage DBP levels, in some cases providing the potential for reductions of DBP precursors of nearly 10%. Additional research is underway that seeks to better understand the sources of natural organic matter in the NYC watershed to provide guidance for on-line monitoring to be used with the OST to support real-time operation support for DBP control.

  8. DOE Office of Scientific and Technical Information (OSTI.GOV)

    BENNETT,D.B.; PAQUETTE,D.E.; KLAUS,K.

    The BNL water supply system meets all water quality standards and has sufficient pumping and storage capacity to meet current and anticipated future operational demands. Because BNL's water supply is drawn from the shallow Upper Glacial aquifer, BNL's source water is susceptible to contamination. The quality of the water supply is being protected through (1) a comprehensive program of engineered and operational controls of existing aquifer contamination and potential sources of new contamination, (2) groundwater monitoring, and (3) potable water treatment. The BNL Source Water Assessment found that the source water for BNL's Western Well Field (comprised of Supply Wellsmore » 4, 6, and 7) has relatively few threats of contamination and identified potential sources are already being carefully managed. The source water for BNL's Eastern Well Field (comprised of Supply Wells 10, 11, and 12) has a moderate number of threats to water quality, primarily from several existing volatile organic compound and tritium plumes. The g-2 Tritium Plume and portions of the Operable Unit III VOC plume fall within the delineated source water area for the Eastern Well Field. In addition, portions of the much slower migrating strontium-90 plumes associated with the Brookhaven Graphite Research Reactor, Waste Concentration Facility and Building 650 lie within the Eastern source water area. However, the rate of travel in the aquifer for strontium-90 is about one-twentieth of that for tritium and volatile organic compounds. The Laboratory has been carefully monitoring plume migration, and has made adjustments to water supply operations. Although a number of BNL's water supply wells were impacted by VOC contamination in the late 1980s, recent routine analysis of water samples from BNL's supply wells indicate that no drinking water standards have been reached or exceeded. The high quality of the water supply strongly indicates that the operational and engineered controls implemented over the past ten years have effectively protected the quality of the water supply.« less

  9. Design and evaluation of a 3 million DN series-hybrid thrust bearing

    NASA Technical Reports Server (NTRS)

    Scibbe, H. W.; Winn, L. W.; Eusepi, M.

    1976-01-01

    The design and experimental evaluation of a series-hybrid thrust bearing, consisting of a 150-mm ball bearing and a centrifugally actuated, conical, fluid-film bearing, is presented. Tests were conducted up to 16,000 rpm and at this speed an axial load of 15,600 N (3500 lb) was safely supported by the hybrid bearing system. Through the series-hybrid bearing principle, the effective ball bearing speed was reduced to approximately one-half of the shaft speed. A speed reduction of this magnitude would result in a tenfold increase in the ball bearing fatigue life. A successful evaluation of fluid-film bearing lubricant supply failure was performed repeatedly at an operating speed of 10,000 rpm. A complete and smooth changeover to full-scale ball bearing operation was effected when the oil supply to the fluid-film bearing was cut off. Reactivation of the fluid-film oil supply system produced a flawless return to the original mode of hybrid operation.

  10. Instrumentation and control system architecture of ECRH SST1

    NASA Astrophysics Data System (ADS)

    Patel, Harshida; Patel, Jatin; purohit, Dharmesh; Shukla, B. K.; Babu, Rajan; Mistry, Hardik

    2017-07-01

    The Electron Cyclotron Resonance Heating (ECRH) system is an important heating system for the reliable start-up of tokamak. The 42GHz and 82.6GHz Gyrotron based ECRH systems are used in tokomaks SST-1 and Aditya to carry out ECRH related experiments. The Gyrotrons are high power microwave tubes used as a source for ECRH systems. The Gyrotrons need to be handled with optimum care right from the installation to its Full parameter control operation. The Gyrotrons are associated with the subsystems like: High voltage power supplies (Beam voltage and anode voltage), dedicated crowbar system, magnet, filament and ion pump power supplies and cooling system. The other subsystems are transmission line, launcher and dummy load. A dedicated VME based data acquisition & control (DAC) system is developed to operate and control the Gyrotron and its associated sub system. For the safe operation of Gyrotron, two level interlocks with fail-safe logic are developed. Slow signals that are operated in scale of millisecond range are programmed through software and hardware interlock in scale of microsecond range are designed and developed indigenously. Water-cooling and the associated interlock are monitored and control by data logger with independent human machine interface.

  11. Many-objective optimization and visual analytics reveal key trade-offs for London's water supply

    NASA Astrophysics Data System (ADS)

    Matrosov, Evgenii S.; Huskova, Ivana; Kasprzyk, Joseph R.; Harou, Julien J.; Lambert, Chris; Reed, Patrick M.

    2015-12-01

    In this study, we link a water resource management simulator to multi-objective search to reveal the key trade-offs inherent in planning a real-world water resource system. We consider new supplies and demand management (conservation) options while seeking to elucidate the trade-offs between the best portfolios of schemes to satisfy projected water demands. Alternative system designs are evaluated using performance measures that minimize capital and operating costs and energy use while maximizing resilience, engineering and environmental metrics, subject to supply reliability constraints. Our analysis shows many-objective evolutionary optimization coupled with state-of-the art visual analytics can help planners discover more diverse water supply system designs and better understand their inherent trade-offs. The approach is used to explore future water supply options for the Thames water resource system (including London's water supply). New supply options include a new reservoir, water transfers, artificial recharge, wastewater reuse and brackish groundwater desalination. Demand management options include leakage reduction, compulsory metering and seasonal tariffs. The Thames system's Pareto approximate portfolios cluster into distinct groups of water supply options; for example implementing a pipe refurbishment program leads to higher capital costs but greater reliability. This study highlights that traditional least-cost reliability constrained design of water supply systems masks asset combinations whose benefits only become apparent when more planning objectives are considered.

  12. Base-Level Guide for Electromagnetic Frequency Radiation

    DTIC Science & Technology

    2012-12-01

    hazards of EMF-producing systems and equipment, e.g., hazard of electromagnetic radiation to ordnance (HERO), and hazard ...AFRL-SA-WP-SR-2013-0003 BASE-LEVEL GUIDE FOR ELECTROMAGNETIC FREQUENCY RADIATION Matthew W. Uelen Battelle Memorial Institute...COVERED (From – To) Dec 2011 – Dec 2012 4. TITLE AND SUBTITLE Base-Level Guide for Electromagnetic Frequency Radiation 5a. CONTRACT NUMBER

  13. Global Combat Support System-Marine Corps Logistics Chain Management Increment 1 (GCSS-MC LCM Inc 1)

    DTIC Science & Technology

    2016-03-01

    Production Document DAE - Defense Acquisition Executive DoD - Department of Defense DoDAF - DoD Architecture Framework FD - Full Deployment FDD ...Jul 2004 Milestone B Jun 2007 Jun 2007 Milestone C May 2010 May 2010 FDD Sep 2014 Mar 2015 FD Dec 2015 Dec 2015 GCSS-MC LCM Inc 1 2016 MAR

  14. Multinomial modeling and an evaluation of common data-mining algorithms for identifying signals of disproportionate reporting in pharmacovigilance databases.

    PubMed

    Johnson, Kjell; Guo, Cen; Gosink, Mark; Wang, Vicky; Hauben, Manfred

    2012-12-01

    A principal objective of pharmacovigilance is to detect adverse drug reactions that are unknown or novel in terms of their clinical severity or frequency. One method is through inspection of spontaneous reporting system databases, which consist of millions of reports of patients experiencing adverse effects while taking one or more drugs. For such large databases, there is an increasing need for quantitative and automated screening tools to assist drug safety professionals in identifying drug-event combinations (DECs) worthy of further investigation. Existing algorithms can effectively identify problematic DECs when the frequencies are high. However these algorithms perform differently for low-frequency DECs. In this work, we provide a method based on the multinomial distribution that identifies signals of disproportionate reporting, especially for low-frequency combinations. In addition, we comprehensively compare the performance of commonly used algorithms with the new approach. Simulation results demonstrate the advantages of the proposed method, and analysis of the Adverse Event Reporting System data shows that the proposed method can help detect interesting signals. Furthermore, we suggest that these methods be used to identify DECs that occur significantly less frequently than expected, thus identifying potential alternative indications for these drugs. We provide an empirical example that demonstrates the importance of exploring underexpected DECs. Code to implement the proposed method is available in R on request from the corresponding authors. kjell@arboranalytics.com or Mark.M.Gosink@Pfizer.com Supplementary data are available at Bioinformatics online.

  15. Dynamic electronic collimation method for 3-D catheter tracking on a scanning-beam digital x-ray system

    PubMed Central

    Dunkerley, David A. P.; Slagowski, Jordan M.; Funk, Tobias; Speidel, Michael A.

    2017-01-01

    Abstract. Scanning-beam digital x-ray (SBDX) is an inverse geometry x-ray fluoroscopy system capable of tomosynthesis-based 3-D catheter tracking. This work proposes a method of dose-reduced 3-D catheter tracking using dynamic electronic collimation (DEC) of the SBDX scanning x-ray tube. This is achieved through the selective deactivation of focal spot positions not needed for the catheter tracking task. The technique was retrospectively evaluated with SBDX detector data recorded during a phantom study. DEC imaging of a catheter tip at isocenter required 340 active focal spots per frame versus 4473 spots in full field-of-view (FOV) mode. The dose-area product (DAP) and peak skin dose (PSD) for DEC versus full FOV scanning were calculated using an SBDX Monte Carlo simulation code. The average DAP was reduced to 7.8% of the full FOV value, consistent with the relative number of active focal spots (7.6%). For image sequences with a moving catheter, PSD was 33.6% to 34.8% of the full FOV value. The root-mean-squared-deviation between DEC-based 3-D tracking coordinates and full FOV 3-D tracking coordinates was less than 0.1 mm. The 3-D distance between the tracked tip and the sheath centerline averaged 0.75 mm. DEC is a feasible method for dose reduction during SBDX 3-D catheter tracking. PMID:28439521

  16. 78 FR 68039 - Privacy Act of 1974; System of Records

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-13

    ... leadership regarding travel, training and supplies. Data is used by leadership to effectively and efficiently... of providing operational metrics, tracking budgets, and presenting work products to senior leadership regarding travel, training, and supply. Data is used by leadership to effectively and efficiently make...

  17. 76 FR 49467 - Combined Notice of Filings #1

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-10

    .... Applicants: Wolverine Power Supply Cooperative, Inc., Midwest Independent Transmission System Operator, Inc. Description: Wolverine Power Supply Cooperative, Inc. submits tariff filing per 35.13(a)(2)(iii: Wolverine...: Southwest Power Pool, Inc. Description: Southwest Power Pool, Inc. submits tariff filing per 35.17(b...

  18. A Real-Time Decision Support System for Voltage Collapse Avoidance in Power Supply Networks

    NASA Astrophysics Data System (ADS)

    Chang, Chen-Sung

    This paper presents a real-time decision support system (RDSS) based on artificial intelligence (AI) for voltage collapse avoidance (VCA) in power supply networks. The RDSS scheme employs a fuzzy hyperrectangular composite neural network (FHRCNN) to carry out voltage risk identification (VRI). In the event that a threat to the security of the power supply network is detected, an evolutionary programming (EP)-based algorithm is triggered to determine the operational settings required to restore the power supply network to a secure condition. The effectiveness of the RDSS methodology is demonstrated through its application to the American Electric Power Provider System (AEP, 30-bus system) under various heavy load conditions and contingency scenarios. In general, the numerical results confirm the ability of the RDSS scheme to minimize the risk of voltage collapse in power supply networks. In other words, RDSS provides Power Provider Enterprises (PPEs) with a viable tool for performing on-line voltage risk assessment and power system security enhancement functions.

  19. Smart Power Supply for Battery-Powered Systems

    NASA Technical Reports Server (NTRS)

    Krasowski, Michael J.; Greer, Lawrence; Prokop, Norman F.; Flatico, Joseph M.

    2010-01-01

    A power supply for battery-powered systems has been designed with an embedded controller that is capable of monitoring and maintaining batteries, charging hardware, while maintaining output power. The power supply is primarily designed for rovers and other remote science and engineering vehicles, but it can be used in any battery alone, or battery and charging source applications. The supply can function autonomously, or can be connected to a host processor through a serial communications link. It can be programmed a priori or on the fly to return current and voltage readings to a host. It has two output power busses: a constant 24-V direct current nominal bus, and a programmable bus for output from approximately 24 up to approximately 50 V. The programmable bus voltage level, and its output power limit, can be changed on the fly as well. The power supply also offers options to reduce the programmable bus to 24 V when the set power limit is reached, limiting output power in the case of a system fault detected in the system. The smart power supply is based on an embedded 8051-type single-chip microcontroller. This choice was made in that a credible progression to flight (radiation hard, high reliability) can be assumed as many 8051 processors or gate arrays capable of accepting 8051-type core presently exist and will continue to do so for some time. To solve the problem of centralized control, this innovation moves an embedded microcontroller to the power supply and assigns it the task of overseeing the operation and charging of the power supply assets. This embedded processor is connected to the application central processor via a serial data link such that the central processor can request updates of various parameters within the supply, such as battery current, bus voltage, remaining power in battery estimations, etc. This supply has a direct connection to the battery bus for common (quiescent) power application. Because components from multiple vendors may have differing power needs, this supply also has a secondary power bus, which can be programmed a priori or on-the-fly to boost the primary battery voltage level from 24 to 50 V to accommodate various loads as they are brought on line. Through voltage and current monitoring, the device can also shield the charging source from overloads, keep it within safe operating modes, and can meter available power to the application and maintain safe operations.

  20. [Surgical treatment of inferior pole comminuted fractures of patella with new type tension band].

    PubMed

    Sun, B; Zhang, Z S; Zhou, F; Tian, Y; Ji, H Q; Guo, Y; Lv, Y; Yang, Z W

    2015-04-18

    To study the effectiveness of inferior pole fracture of patella treating by the new tension band. From Dec. 2011 to Dec. 2013, 21 patients with inferior pole fracture of patella were treated with the new tension band which consisted of cannulated screw, titanium cable and shims. There were 21 patients[10 males, 11 females, the average age was 54 years(21 to 79)],of whom,all were "fell on knees". The average operation time was 89 min (57-197 min),the follow-up visits were done from 7-31 months (average 18 months), the bone healing time was from 8-12 weeks (average 10.5 weeks). The post operation assessment was done by Bostman score, from 20-30 (average 27),10 excellent,and 11 good. No complication occurred. The new tension band is the effective treatment for inferior pole fracture of patella. The internal fixation is reliable, it is simple to operate, and patients can take exercises as early as possible. Therefore, the new tension band has a better clinical value.

  1. Data management applications

    NASA Technical Reports Server (NTRS)

    1983-01-01

    Kennedy Space Center's primary institutional computer is a 4 megabyte IBM 4341 with 3.175 billion characters of IBM 3350 disc storage. This system utilizes the Software AG product known as ADABAS with the on line user oriented features of NATURAL and COMPLETE as a Data Base Management System (DBMS). It is operational under the OS/VSI and is currently supporting batch/on line applications such as Personnel, Training, Physical Space Management, Procurement, Office Equipment Maintenance, and Equipment Visibility. A third and by far the largest DBMS application is known as the Shuttle Inventory Management System (SIMS) which is operational on a Honeywell 6660 (dedicated) computer system utilizing Honeywell Integrated Data Storage I (IDSI) as the DBMS. The SIMS application is designed to provide central supply system acquisition, inventory control, receipt, storage, and issue of spares, supplies, and materials.

  2. Future Supply Chains Enabled by Continuous Processing-Opportunities Challenges May 20-21 2014 Continuous Manufacturing Symposium.

    PubMed

    Srai, Jagjit Singh; Badman, Clive; Krumme, Markus; Futran, Mauricio; Johnston, Craig

    2015-03-01

    This paper examines the opportunities and challenges facing the pharmaceutical industry in moving to a primarily "continuous processing"-based supply chain. The current predominantly "large batch" and centralized manufacturing system designed for the "blockbuster" drug has driven a slow-paced, inventory heavy operating model that is increasingly regarded as inflexible and unsustainable. Indeed, new markets and the rapidly evolving technology landscape will drive more product variety, shorter product life-cycles, and smaller drug volumes, which will exacerbate an already unsustainable economic model. Future supply chains will be required to enhance affordability and availability for patients and healthcare providers alike despite the increased product complexity. In this more challenging supply scenario, we examine the potential for a more pull driven, near real-time demand-based supply chain, utilizing continuous processing where appropriate as a key element of a more "flow-through" operating model. In this discussion paper on future supply chain models underpinned by developments in the continuous manufacture of pharmaceuticals, we have set out; The paper recognizes that although current batch operational performance in pharma is far from optimal and not necessarily an appropriate end-state benchmark for batch technology, the adoption of continuous supply chain operating models underpinned by continuous production processing, as full or hybrid solutions in selected product supply chains, can support industry transformations to deliver right-first-time quality at substantially lower inventory profiles. © 2015 The Authors. Journal of Pharmaceutical Sciences published by Wiley Periodicals, Inc. and the American Pharmacists Association. © 2014 Wiley Periodicals, Inc. and the American Pharmacists Association.

  3. 14 CFR 27.1585 - Operating procedures.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... battery from its charging source must be furnished. (e) If the unusable fuel supply in any tank exceeds... each operating condition in which the fuel system independence prescribed in § 27.953 is necessary for safety must be furnished, together with instructions for placing the fuel system in a configuration used...

  4. SCRL-Model for Human Space Flight Operations Enterprise Supply Chain

    NASA Technical Reports Server (NTRS)

    Tucker, Brian; Paxton, Joseph

    2010-01-01

    This paper will present a Supply Chain Readiness Level (SCRL) model that can be used to evaluate and configure adaptable and sustainable program and mission supply chains at an enterprise level. It will also show that using SCRL in conjunction with Technology Readiness Levels (TRLs), Manufacturing Readiness Levels (MRLs) and National Aeronautics Space Administrations (NASA s) Project Lifecycle Process will provide a more complete means of developing and evaluating a robust sustainable supply chain that encompasses the entire product, system and mission lifecycle. In addition, it will be shown that by implementing the SCRL model, NASA can additionally define supplier requirements to enable effective supply chain management (SCM). Developing and evaluating overall supply chain readiness for any product, system and mission lifecycle is critical for mission success. Readiness levels are presently being used to evaluate the maturity of technology and manufacturing capability during development and deployment phases of products and systems. For example, TRLs are used to support the assessment of the maturity of a particular technology and compare maturity of different types of technologies. MRLs are designed to assess the maturity and risk of a given technology from a manufacturing perspective. In addition, when these measurement systems are used collectively they can offer a more comprehensive view of the maturity of the system. While some aspects of the supply chain and supply chain planning are considered in these familiar metric systems, certain characteristics of an effective supply chain, when evaluated in more detail, will provide an improved insight into the readiness and risk throughout the supply chain. Therefore, a system that concentrates particularly on supply chain attributes is required to better assess enterprise supply chain readiness.

  5. KSC-2014-4816

    NASA Image and Video Library

    2014-12-10

    SAN DIEGO, Calif. -- The Orion crew module has been secured in the crew module transportation fixture at the Mole Pier at Naval Base San Diego in California. The fixture has been secured on the back of a flatbed truck and the cover has been lowered over the spacecraft. Orion is being prepared for the overland trip back to NASA's Kennedy Space Center in Florida. Orion was recovered from the Pacific Ocean after completing a two-orbit, four-and-a-half hour mission Dec. 5 to test systems critical to crew safety, including the launch abort system, the heat shield and the parachute system. NASA, the U.S. Navy and Lockheed Martin coordinated efforts to recover Orion. The Ground Systems Development and Operations Program led the recovery, offload and pre-transportation efforts. For more information, visit www.nasa.gov/orion Photo credit: NASA/Cory Huston

  6. KSC-2014-4815

    NASA Image and Video Library

    2014-12-10

    SAN DIEGO, Calif. -- The Orion crew module has been lowered and secured in the crew module transportation fixture at the Mole Pier at Naval Base San Diego in California. The fixture has been secured on the back of a flatbed truck and the cover is being lowered over the spacecraft. Orion is being prepared for the overland trip back to NASA's Kennedy Space Center in Florida. Orion was recovered from the Pacific Ocean after completing a two-orbit, four-and-a-half hour mission Dec. 5 to test systems critical to crew safety, including the launch abort system, the heat shield and the parachute system. NASA, the U.S. Navy and Lockheed Martin coordinated efforts to recover Orion. The Ground Systems Development and Operations Program led the recovery, offload and pre-transportation efforts. For more information, visit www.nasa.gov/orion Photo credit: NASA/Cory Huston

  7. Report: EPA’s and Mississippi’s Efforts to Assess and Restore Public Drinking Water Supplies after Hurricane Katrina

    EPA Pesticide Factsheets

    Report #2006-P-00011, February 14, 2006. The Mississippi Department of Health and drinking water system operators provided the public with timely and accurate information about the safety and proper treatment of public drinking water supplies.

  8. Annual Plan for the EPA and CSB - FY 2017

    EPA Pesticide Factsheets

    Dec 19, 2016. This plan describes how the OIG will achieve its statutory mission of promoting economy, efficiency, effectiveness and integrity relating to the programs and operations of the EPA and the U.S. Chemical Safety and Hazard Investigation Board.

  9. 16 CFR 0.10 - Office of the Executive Director.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ..., financial management, information technology, and human resources. [65 FR 78408, Dec. 15, 2000] ... Chairman, is the chief operating official who develops and implements management and administrative... on strategic planning and assessing the management and resource implications of any proposed action...

  10. 16 CFR 0.10 - Office of the Executive Director.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... on strategic planning and assessing the management and resource implications of any proposed action... Chairman, is the chief operating official who develops and implements management and administrative..., financial management, information technology, and human resources. [65 FR 78408, Dec. 15, 2000] ...

  11. Orion Journey to Mars, L-2 Briefing

    NASA Image and Video Library

    2014-12-02

    At NASA's Kennedy Space Center in Florida, NASA leaders spoke to members of the news media about how the first flight of the new Orion spacecraft is a first step in the agency's plans to send humans to Mars. At Kennedy's News Center auditorium from the left are: Mike Curie of NASA Public Affairs, Mike Bolger, program manager of Ground Systems Development and Operations Program, and Chris Crumbly, manager of Space Launch System Spacecraft/Payload Integration and Evolution. Participating via video from the agency's headquarters in Washington included Jason Crusan, director of Advanced Exploration Systems Division of Human Exploration and Operations Mission Directorate, seen on the monitor on the right. Orion is the exploration spacecraft designed to carry astronauts to destinations not yet explored by humans, including an asteroid and Mars. It will have emergency abort capability, sustain the crew during space travel and provide safe re-entry from deep space return velocities. The first unpiloted flight test of Orion is scheduled to launch Dec. 4, 2014 atop a United Launch Alliance Delta IV Heavy rocket, and in 2018 on NASA’s Space Launch System rocket.

  12. Arc fault detection system

    DOEpatents

    Jha, Kamal N.

    1999-01-01

    An arc fault detection system for use on ungrounded or high-resistance-grounded power distribution systems is provided which can be retrofitted outside electrical switchboard circuits having limited space constraints. The system includes a differential current relay that senses a current differential between current flowing from secondary windings located in a current transformer coupled to a power supply side of a switchboard, and a total current induced in secondary windings coupled to a load side of the switchboard. When such a current differential is experienced, a current travels through a operating coil of the differential current relay, which in turn opens an upstream circuit breaker located between the switchboard and a power supply to remove the supply of power to the switchboard.

  13. Technoeconomic assumptions adopted for the development of a long-term electricity supply model for Cyprus.

    PubMed

    Taliotis, Constantinos; Taibi, Emanuele; Howells, Mark; Rogner, Holger; Bazilian, Morgan; Welsch, Manuel

    2017-10-01

    The generation mix of Cyprus has been dominated by oil products for decades. In order to conform with European Union and international legislation, a transformation of the supply system is called for. Energy system models can facilitate energy planning into the future, but a large volume of data is required to populate such models. The present data article provides information on key modelling assumptions and input data adopted with the aim of representing the electricity supply system of Cyprus in a separate research article. Data in regards to renewable energy technoeconomic characteristics and investment cost projections, fossil fuel price projections, storage technology characteristics and system operation assumptions are described in this article.

  14. KSC-2014-4868

    NASA Image and Video Library

    2014-12-19

    CAPE CANAVERAL, Fla. -- NASA's Orion spacecraft is viewed by members of the media at the Launch Abort System Facility at NASA's Kennedy Space Center in Florida. Lou Garcia, with the Ground Systems Development and Operations Program, or GSDO, speaks to the media during the viewing opportunity. The spacecraft's cross-country return, a 2,700 mile road trip from Naval Base San Diego to Kennedy, sets the stage for in-depth analysis of data obtained during Orion's trip to space. It will provide engineers with detailed information on how the spacecraft fared during its two-orbit, 4.5-hour flight test, completed on Dec. 5. GSDO led the recovery, offload and transportation efforts. For more information, visit www.nasa.gov/orion. Photo credit: NASA/Dimitri Gerondidakis

  15. KSC-2014-4867

    NASA Image and Video Library

    2014-12-19

    CAPE CANAVERAL, Fla. -- NASA's Orion spacecraft is viewed by members of the media at the Launch Abort System Facility at NASA's Kennedy Space Center in Florida. Lou Garcia, with the Ground Systems Development and Operations Program, or GSDO, speaks to the media during the viewing opportunity. The spacecraft's cross-country return, a 2,700 mile road trip from Naval Base San Diego to Kennedy, sets the stage for in-depth analysis of data obtained during Orion's trip to space. It will provide engineers with detailed information on how the spacecraft fared during its two-orbit, 4.5-hour flight test, completed on Dec. 5. GSDO led the recovery, offload and transportation efforts. For more information, visit www.nasa.gov/orion. Photo credit: NASA/Dimitri Gerondidakis

  16. KSC-2014-4866

    NASA Image and Video Library

    2014-12-19

    CAPE CANAVERAL, Fla. -- NASA's Orion spacecraft is viewed by members of the media at the Launch Abort System Facility at NASA's Kennedy Space Center in Florida. Lou Garcia, with the Ground Systems Development and Operations Program, or GSDO, speaks to the media during the viewing opportunity. The spacecraft's cross-country return, a 2,700 mile road trip from Naval Base San Diego to Kennedy, sets the stage for in-depth analysis of data obtained during Orion's trip to space. It will provide engineers with detailed information on how the spacecraft fared during its two-orbit, 4.5-hour flight test, completed on Dec. 5. GSDO led the recovery, offload and transportation efforts. For more information, visit www.nasa.gov/orion. Photo credit: NASA/Dimitri Gerondidakis

  17. Power supply system for negative ion source at IPR

    NASA Astrophysics Data System (ADS)

    Gahlaut, Agrajit; Sonara, Jashwant; Parmar, K. G.; Soni, Jignesh; Bandyopadhyay, M.; Singh, Mahendrajit; Bansal, Gourab; Pandya, Kaushal; Chakraborty, Arun

    2010-02-01

    The first step in the Indian program on negative ion beams is the setting up of Negative ion Experimental Assembly - RF based, where 100 kW of RF power shall be coupled to a plasma source producing plasma of density ~5 × 1012 cm-3, from which ~ 10 A of negative ion beam shall be produced and accelerated to 35 kV, through an electrostatic ion accelerator. The experimental system is modelled similar to the RF based negative ion source, BATMAN presently operating at IPP, Garching, Germany. The mechanical system for Negative Ion Source Assembly is close to the IPP source, remaining systems are designed and procured principally from indigenous sources, keeping the IPP configuration as a base line. High voltage (HV) and low voltage (LV) power supplies are two key constituents of the experimental setup. The HV power supplies for extraction and acceleration are rated for high voltage (~15 to 35kV), and high current (~ 15 to 35A). Other attributes are, fast rate of voltage rise (< 5ms), good regulation (< ±1%), low ripple (< ±2%), isolation (~50kV), low energy content (< 10J) and fast cut-off (< 100μs). The low voltage (LV) supplies required for biasing and providing heating power to the Cesium oven and the plasma grids; have attributes of low ripple, high stability, fast and precise regulation, programmability and remote operation. These power supplies are also equipped with over-voltage, over-current and current limit (CC Mode) protections. Fault diagnostics, to distinguish abnormal rise in currents (breakdown faults) with over-currents is enabled using fast response breakdown and over-current protection scheme. To restrict the fault energy deposited on the ion source, specially designed snubbers are implemented in each (extraction and acceleration) high voltage path to swap the surge energy. Moreover, the monitoring status and control signals from these power supplies are required to be electrically (~ 50kV) isolated from the system. The paper shall present the design basis, topology selection, manufacturing, testing, commissioning, integration and control strategy of these HVPS. A complete power interconnection scheme, which includes all protective devices and measuring devices, low & high voltage power supplies, monitoring and control signals etc. shall also be discussed. The paper also discusses the protocols involved in grounding and shielding, particularly in operating the system in RF environment.

  18. Altered Stra13 and Dec2 circadian gene expression in hypoxic cells

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Guillaumond, Fabienne; Lacoche, Samuel; Dulong, Sandrine

    2008-05-16

    The circadian system regulates rhythmically most of the mammalian physiology in synchrony with the environmental light/dark cycle. Alteration of circadian clock gene expression has been associated with tumour progression but the molecular links between the two mechanisms remain poorly defined. Here we show that Stra13 and Dec2, two circadian transcriptional regulators which play a crucial role in cell proliferation and apoptosis are overexpressed and no longer rhythmic in serum shocked fibroblasts treated with CoCl{sub 2,} a substitute of hypoxia. This effect is associated with a loss of circadian expression of the clock genes Rev-erb{alpha} and Bmal1, and the clock-controlled genemore » Dbp. Consistently, cotransfection assays demonstrate that STRA13 and DEC2 both antagonize CLOCK:BMAL1 dependent transactivation of the Rev-erb{alpha} and Dbp promoters. Using a transplantable osteosarcoma tumour model, we show that hypoxia is associated with altered circadian expression of Stra13, Dec2, Rev-erb{alpha}, Bmal1 and Dbp in vivo. These observations collectively support the notion that overexpression of Stra13 and Dec2 links hypoxia signalling to altered circadian clock gene expression.« less

  19. An IT-enabled supply chain model: a simulation study

    NASA Astrophysics Data System (ADS)

    Cannella, Salvatore; Framinan, Jose M.; Barbosa-Póvoa, Ana

    2014-11-01

    During the last decades, supply chain collaboration practices and the underlying enabling technologies have evolved from the classical electronic data interchange (EDI) approach to a web-based and radio frequency identification (RFID)-enabled collaboration. In this field, most of the literature has focused on the study of optimal parameters for reducing the total cost of suppliers, by adopting operational research (OR) techniques. Herein we are interested in showing that the considered information technology (IT)-enabled structure is resilient, that is, it works well across a reasonably broad range of parameter settings. By adopting a methodological approach based on system dynamics, we study a multi-tier collaborative supply chain. Results show that the IT-enabled supply chain improves operational performance and customer service level. Nonetheless, benefits for geographically dispersed networks are of minor entity.

  20. Advanced chemical hydride-based hydrogen generation/storage system for fuel cell vehicles

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Breault, R.W.; Rolfe, J.

    1998-08-01

    Because of the inherent advantages of high efficiency, environmental acceptability, and high modularity, fuel cells are potentially attractive power supplies. Worldwide concerns over clean environments have revitalized research efforts on developing fuel cell vehicles (FCV). As a result of intensive research efforts, most of the subsystem technology for FCV`s are currently well established. These include: high power density PEM fuel cells, control systems, thermal management technology, and secondary power sources for hybrid operation. For mobile applications, however, supply of hydrogen or fuel for fuel cell operation poses a significant logistic problem. To supply high purity hydrogen for FCV operation, Thermomore » Power`s Advanced Technology Group is developing an advanced hydrogen storage technology. In this approach, a metal hydride/organic slurry is used as the hydrogen carrier and storage media. At the point of use, high purity hydrogen will be produced by reacting the metal hydride/organic slurry with water. In addition, Thermo Power has conceived the paths for recovery and regeneration of the spent hydride (practically metal hydroxide). The fluid-like nature of the spent hydride/organic slurry will provide a unique opportunity for pumping, transporting, and storing these materials. The final product of the program will be a user-friendly and relatively high energy storage density hydrogen supply system for fuel cell operation. In addition, the spent hydride can relatively easily be collected at the pumping station and regenerated utilizing renewable sources, such as biomass, natural, or coal, at the central processing plants. Therefore, the entire process will be economically favorable and environmentally friendly.« less

Top