Sample records for demolition sites closure

  1. Bat Surveys of Retired Facilitiies Scheduled for Demolition by Washington Closure Hanford

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Gano, K. A.; Lucas, J. G.; Lindsey, C. T.

    2011-06-30

    This project was conducted to evaluate buildings and facilities remaining in the Washington Closure Hanford (WCH) deactivation, decontamination, decommissioning, and demolition schedule for bat roost sites. The project began in spring of 2009 and was concluded in spring of 2011. A total of 196 buildings and facilities were evaluated for the presence of bat roosting sites. The schedule for the project was prioritized to accommodate the demolition schedule. As the surveys were completed, the results were provided to the project managers to facilitate planning and project completion. The surveys took place in the 300 Area, 400 Area, 100-H, 100-D, 100-N,more » and 100-B/C Area. This report is the culmination of all the bat surveys and summarizes the findings by area and includes recommended mitigation actions where bat roosts were found.« less

  2. Addendum to the Closure Report for Corrective Action Unit 113: Area 25 R-MAD Facility, Nevada National Security Site, Nevada

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NSTec Environmental Restoration

    2011-02-24

    This addendum to the Closure Report for Corrective Action Unit 113: Area 25, Reactor Maintenance, Assembly, and Disassembly Facility, Building 3110, Nevada Test Site, Nevada, DOE/NV--891-VOL I-Rev. 1, dated July 2003, provides details of demolition, waste disposal, and use restriction (UR) modification for Corrective Action Unit 113, Area 25 R-MAD Facility. Demolition was completed on July 15, 2010, when the last of the building debris was disposed. Final field activities were concluded on August 30, 2010, after all equipment was demobilized and UR signs were posted. This work was funded by the American Recovery and Reinvestment Act.

  3. 75 FR 64718 - Environmental Management Site-Specific Advisory Board, Nevada

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-20

    ... Industrial Sites and Soils Committees of the Environmental Management Site-Specific Advisory Board (EM SSAB... Test Site including decontamination, closure, re-use and/or demolition. Purpose of the Soils Committee: The purpose of the Committee is to focus on issues related to soil contamination at the Nevada Test...

  4. Achieving Effective Risk Management Reduction Throughout Decommissioning at the Columbus Closure Project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Anderson, K.D.

    2006-07-01

    Nuclear facility decontamination, dismantlement, and demolition activities provide a myriad of challenges along the path to reaching a safe, effective, and compliant decommissioning. Among the challenges faced during decommissioning, is the constant management and technical effort to eliminate, mitigate, or minimize the potential of risks of radiation exposures and other hazards to the worker, the surrounding community, and the environment. Management strategies to eliminate, mitigate, or minimize risks include incorporating strong safety and As Low As Reasonably Achievable (ALARA) principles into an integrated work planning process. Technical and operational strategies may include utilizing predictive risk analysis tools to establish contaminationmore » limits for demolition and using remote handling equipment to reduce occupational and radiation exposures to workers. ECC and E2 Closure Services, LLC (Closure Services) have effectively utilized these management and technical tools to eliminate, mitigate, and reduce radiation exposures under contract to the U.S. Department of Energy (DOE) for the decontamination and decommissioning Columbus Closure Project (CCP). In particular, Closure Services achieved significant dose reduction during the dismantling, decontamination, and demolition activities for Building JN-1. Management strategies during the interior dismantlement, decontamination, and demolition of the facility demanded an integrated work planning processes that involved project disciplines. Integrated planning processes identified multiple opportunities to incorporate the use of remote handling equipment during the interior dismantling and demolition activities within areas of high radiation. Technical strategies employed predictive risk analysis tools to set upper bounding contamination limits, allowed for the radiological demolition of the building without exceeding administrative dose limits to the worker, general public, and the environment. Adhering to management and technical strategies during the dismantlement, decontamination, and demolition of Building JN-1 enabled Closure Services to achieve strong ALARA performance, maintain absolute compliance under the regulatory requirements and meeting licensing conditions for decommissioning. (authors)« less

  5. Calder Hall Cooling Tower Demolition: Landmark Milestone for Decommissioning at Sellafield

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Williamson, E.J.

    2008-07-01

    September 2007 saw a very visible change to the Sellafield site following the culmination of a major decommissioning project; the demolition of the four Calder Hall cooling towers. A key part of the UK's nuclear industrial heritage, Calder Hall, the world's first commercial nuclear power station, was opened by Her Majesty Queen Elizabeth II in October 1953 and continued to generate electricity until its closure in 2003. Following the decision to decommission the Calder Hall site, explosive demolition was identified as the safest and most cost effective route for the removal of the towers. The technique, involving the placement ofmore » explosive in 60% of the circumference of both shell and legs, is a tried and tested method which had already been used successfully in more than 200 cooling towers in the UK in the last 30 years. The location and composition of the four 88 metre high towers also created additional challenges. Situated only 40 metres away from the UK's only nuclear Fuel Handling Plant, as well as other sensitive structures on the Sellafield site, the project had to address the impact of a number of key areas, including dust, ground vibration and air over pressure, to ensure that the demolition could be carried out safely and without significant impact on other operational areas on the site. At the same time, the towers had to be prepared for demolition in a way that minimised the amounts of radioactive or hazardous waste materials arising. This paper follows the four year journey from the initial decision to demolish the towers right through to the demolition itself as well as the clean up of the site post demolition. It will also consider the massive programme of work necessary not only to carry out the physical work safely but also to gain regulatory confidence and stakeholder support to carry out the project successfully. In summary: The demolition of the four Calder Hall cooling towers was a highly visible symbol of the changes that are occurring on the Sellafield site as it moves forward towards a decommissioning future. Although in itself the demolition was both straightforward and standard, the various complexities posed by the towers situation at Sellafield introduced an entirely new element to the project, with a number of complex challenges which had to be overcome or resolved before the demolition could take place. It is a testament to the skill and dedication of the project team and its associated contractors that the project was delivered safely and successfully without a single accident, injury or event throughout the entire four years, and with minimal impact on both site operations and the local community. (authors)« less

  6. Nuclear Rocket Facility Decommissioning Project: Controlled Explosive Demolition of Neutron-Activated Shield Wall

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Michael R. Kruzic

    2008-06-01

    Located in Area 25 of the Nevada Test Site (NTS), the Test Cell A (TCA) Facility (Figure 1) was used in the early to mid-1960s for testing of nuclear rocket engines, as part of the Nuclear Rocket Development Program, to further space travel. Nuclear rocket testing resulted in the activation of materials around the reactors and the release of fission products and fuel particles. The TCA facility, known as Corrective Action Unit 115, was decontaminated and decommissioned (D&D) from December 2004 to July 2005 using the Streamlined Approach for Environmental Restoration (SAFER) process, under the Federal Facility Agreement and Consentmore » Order. The SAFER process allows environmental remediation and facility closure activities (i.e., decommissioning) to occur simultaneously, provided technical decisions are made by an experienced decision maker within the site conceptual site model. Facility closure involved a seven-step decommissioning strategy. First, preliminary investigation activities were performed, including review of process knowledge documentation, targeted facility radiological and hazardous material surveys, concrete core drilling and analysis, shield wall radiological characterization, and discrete sampling, which proved to be very useful and cost-effective in subsequent decommissioning planning and execution and worker safety. Second, site setup and mobilization of equipment and personnel were completed. Third, early removal of hazardous materials, including asbestos, lead, cadmium, and oil, was performed ensuring worker safety during more invasive demolition activities. Process piping was to be verified void of contents. Electrical systems were de-energized and other systems were rendered free of residual energy. Fourth, areas of high radiological contamination were decontaminated using multiple methods. Contamination levels varied across the facility. Fixed beta/gamma contamination levels ranged up to 2 million disintegrations per minute (dpm)/100 centimeters squared (cm2) beta/gamma. Removable beta/gamma contamination levels seldom exceeded 1,000 dpm/100 cm2, but, in railroad trenches on the reactor pad containing soil on the concrete pad in front of the shield wall, the beta dose rates ranged up to 120 milli-roentgens per hour from radioactivity entrained in the soil. General area dose rates were less than 100 micro-roentgens per hour. Prior to demolition of the reactor shield wall, removable and fixed contaminated surfaces were decontaminated to the best extent possible, using traditional decontamination methods. Fifth, large sections of the remaining structures were demolished by mechanical and open-air controlled explosive demolition (CED). Mechanical demolition methods included the use of conventional demolition equipment for removal of three main buildings, an exhaust stack, and a mobile shed. The 5-foot (ft), 5-inch (in.) thick, neutron-activated reinforced concrete shield was demolished by CED, which had never been performed at the NTS.« less

  7. Development and Implementation of the Waste Management Information System to Support Hanford's River Corridor Cleanup

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Nolan, L. M.

    2006-07-01

    This paper describes the development of a Waste Information Management System (WMIS) to support the waste designation, transportation, and disposal processes used by Washington Closure Hanford, LLC to support cleanup of the Columbia River Corridor. This waste, primarily consisting of remediated burial sites and building demolition debris, is disposed at the Environmental Restoration Disposal Facility (ERDF), which is located in the center of the Hanford Site (an approximately 1460 square kilometers site). WMIS uses a combination of bar-code scanning, hand-held computers, and strategic employment of a radio frequency identification (RFID) tag system to track each waste shipment from waste generationmore » to disposal. (authors)« less

  8. CLOSING IN ON CLOSURE PERSPECTIVES FROM HANFORD & FERNALD AN UPDATE

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    CONNELL, J.D.

    2004-12-22

    In World War II, the arms dramatically changed from machine guns and incendiary bombs to nuclear weapons. Hanford and Fernald, two government-run sites, were part of the infrastructure established for producing the fissile material for making these weapons, as well as building a nuclear arsenal to deter future aggression by other nations. This paper compares and contrasts, from a communications point of view, these two Department of Energy (DOE) closure sites, each with Fluor as a prime contractor. The major differences between the two sites--Hanford in Washington state and Fernald in Ohio--includes the following: size of the site and themore » workforce, timing of closure, definition of end state, DOE oversight, proximity to population centers, readiness of local population for closure, and dependence of the local economy on the site's budget. All of these elements affect how the sites' communication professionals provide information even though the objectives are the same: build public acceptance and support for DOE's mission to accelerate cleanup, interface with stakeholders to help ensure that issues are addressed and goals are met, help workers literally work themselves out of jobs--faster, and prepare the ''host'' communities to deal with the void left when the sites are closed and the government contractors are gone. The 12-months between January 04 and January 05 have seen dramatic transformations at both sites, as Fernald is now just about a year away from closure and FLuor's work at Hanford has made the transition from operations to deactivation and demolition. While Fernald continues to clean out silos of waste and ship it off site, Hanford is dealing with recent state legislation that has the potential to significantly impact the progress of cleanup. These changes have even further accentuated the differences in the content, distribution, and impact of communications.« less

  9. PLUTONIUM FINISHING PLANT (PFP) 241-Z LIQUID WASTE TREATMENT FACILITY DEACTIVATION AND DEMOLITION

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    JOHNSTON GA

    2008-01-15

    Fluor Hanford, Inc. (FH) is proud to submit the Plutonium Finishing Plant (PFP) 241-Z liquid Waste Treatment Facility Deactivation and Demolition (D&D) Project for consideration by the Project Management Institute as Project of the Year for 2008. The decommissioning of the 241-Z Facility presented numerous challenges, many of which were unique with in the Department of Energy (DOE) Complex. The majority of the project budget and schedule was allocated for cleaning out five below-grade tank vaults. These highly contaminated, confined spaces also presented significant industrial safety hazards that presented some of the most hazardous work environments on the Hanford Site.more » The 241-Z D&D Project encompassed diverse tasks: cleaning out and stabilizing five below-grade tank vaults (also called cells), manually size-reducing and removing over three tons of process piping from the vaults, permanently isolating service utilities, removing a large contaminated chemical supply tank, stabilizing and removing plutonium-contaminated ventilation ducts, demolishing three structures to grade, and installing an environmental barrier on the demolition site . All of this work was performed safely, on schedule, and under budget. During the deactivation phase of the project between November 2005 and February 2007, workers entered the highly contaminated confined-space tank vaults 428 times. Each entry (or 'dive') involved an average of three workers, thus equaling approximately 1,300 individual confined -space entries. Over the course of the entire deactivation and demolition period, there were no recordable injuries and only one minor reportable skin contamination. The 241-Z D&D Project was decommissioned under the provisions of the 'Hanford Federal Facility Agreement and Consent Order' (the Tri-Party Agreement or TPA), the 'Resource Conservation and Recovery Act of 1976' (RCRA), and the 'Comprehensive Environmental Response, Compensation, and Liability Act of 1980' (CERCLA). The project completed TPA Milestone M-083-032 to 'Complete those activities required by the 241-Z Treatment and Storage Unit's RCRA Closure Plan' four years and seven months ahead of this legally enforceable milestone. In addition, the project completed TPA Milestone M-083-042 to 'Complete transition and dismantlement of the 241-2 Waste Treatment Facility' four years and four months ahead of schedule. The project used an innovative approach in developing the project-specific RCRA closure plan to assure clear integration between the 241-Z RCRA closure activities and ongoing and future CERCLA actions at PFP. This approach provided a regulatory mechanism within the RCRA closure plan to place segments of the closure that were not practical to address at this time into future actions under CERCLA. Lessons learned from th is approach can be applied to other closure projects within the DOE Complex to control scope creep and mitigate risk. A paper on this topic, entitled 'Integration of the 241-Z Building D and D Under CERCLA with RCRA Closure at the PFP', was presented at the 2007 Waste Management Conference in Tucson, Arizona. In addition, techniques developed by the 241-Z D&D Project to control airborne contamination, clean the interior of the waste tanks, don and doff protective equipment, size-reduce plutonium-contaminated process piping, and mitigate thermal stress for the workers can be applied to other cleanup activities. The project-management team developed a strategy utilizing early characterization, targeted cleanup, and close coordination with PFP Criticality Engineering to significantly streamline the waste- handling costs associated with the project . The project schedule was structured to support an early transition to a criticality 'incredible' status for the 241-Z Facility. The cleanup work was sequenced and coordinated with project-specific criticality analysis to allow the fissile material waste being generated to be managed in a bulk fashion, instead of individual waste packages. This approach negated the need for real-time assay of individual waste packages, greatly improving the efficiency of the cleanup operation. The cleanup and stabilization of the 241-2 Liquid Effluent Treatment Facility reduced radiological risks to the environment and Hanford site workers. It was recognized as a success by regulatory agencies, the media, the DOE-client, and stakeholders. The 241-Z D&D Project demonstrated management excellence in adapting to significant changes in project direction, fostered a safety culture that amassed impressive results on this high-hazard job, maintained excellent communications with the client and stakeholders, and developed and implemented unique cleanup techniques.« less

  10. DOE's Oak Ridge Site Kick Off Demolition of the K-27 Building

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Cange, Sue; Rueter, Ken

    2016-02-10

    DOE's Oak Ridge Office of Environmental Management kicked off demolition of the K-27 Building this month, moving closer to fulfilling Vision 2016 — removal of all gaseous diffusion buildings from the site by year’s end. As the site's last uranium enrichment building falls, it will mark the first-ever demolition and cleanup of a gaseous diffusion complex anywhere.

  11. DOE's Oak Ridge Site Kick Off Demolition of the K-27 Building

    ScienceCinema

    Cange, Sue; Rueter, Ken

    2018-06-21

    DOE's Oak Ridge Office of Environmental Management kicked off demolition of the K-27 Building this month, moving closer to fulfilling Vision 2016 — removal of all gaseous diffusion buildings from the site by year’s end. As the site's last uranium enrichment building falls, it will mark the first-ever demolition and cleanup of a gaseous diffusion complex anywhere.

  12. Green Residential Demolitions: Case Study of Vacant Land Reuse in Storm Water Management in Cleveland

    EPA Science Inventory

    The demolition process impacts how vacant land might be reused for storm water management. For five residential demolition sites (Cleveland, Ohio), an enhanced green demolition process was observed in 2012, and soil physical and hydrologic characteristics were measured predemolit...

  13. Reuse and Recycling Opportunities and Demolition

    EPA Pesticide Factsheets

    Learn which about deconstruction, and which materials are good candidates for reuse and recycling during the pre-demolition planning.  Learn more about how to make the site sustainable after demolition.

  14. 24 CFR 941.103 - Definitions.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... maximum project cost, as described in § 941.306: (1) Demolition of, or remediation of environmental... utility systems, and replacement of off-site underground utility systems, extensive rock and/or soil... preparation), administration, site acquisition, relocation, demolition of, and site remediation of...

  15. Ambient exposure to coarse and fine particle emissions from building demolition

    NASA Astrophysics Data System (ADS)

    Azarmi, Farhad; Kumar, Prashant

    2016-07-01

    Demolition of buildings produce large quantities of particulate matter (PM) that could be inhaled by on-site workers and people living in the neighbourhood, but studies assessing ambient exposure at the real-world demolition sites are limited. We measured concentrations of PM10 (≤10 μm), PM2.5 (≤2.5 μm) and PM1 (≤1 μm) along with local meteorology for 54 working hours over the demolition period. The measurements were carried out at (i) a fixed-site in the downwind of demolished building, (ii) around the site during demolition operation through mobile monitoring, (iii) different distances away from the demolition site through sequential monitoring, and (iv) inside an excavator vehicle cabin and on-site temporary office for engineers. Position of the PM instrument was continuously recorded using a Global Positioning System on a second basis during mobile measurements. Fraction of coarse particles (PM2.5-10) contributed 89 (with mean particle mass concentration, PMC ≈ 133 ± 17 μg m-3), 83 (100 ± 29 μg m-3), and 70% (59 ± 12 μg m-3) of total PMC during the fixed-site, mobile monitoring and sequential measurements, respectively, compared with only 50% (mean 12 ± 6 μg m-3) during the background measurements. The corresponding values for fine particles (PM2.5) were 11, 17 and 30% compared with 50% during background, showing a much greater release of coarse particles during demolition. The openair package in R and map source software (ArcGIS) were used to assess spatial variation of PMCs in downwind and upwind of the demolition site. A modified box model was developed to determine the emission factors, which were 210, 73 and 24 μg m-2 s-1 for PM10, PM2.5 and PM1, respectively. The average respiratory deposited doses to coarse (and fine) particles inside the excavator cabin and on-site temporary office increased by 57- (and 5-) and 13- (and 2-) times compared with the local background level, respectively. The monitoring stations in downwind direction illustrated a logarithmic decrease of PM with distance. Energy-dispersive X-ray spectroscopy and scanning electron microscopy were used to assess physicochemical features of particles. The minerals such as silica were found as a marker of demolition dust and elements such as sulphur coming from construction machinery emissions. Findings of this study highlight a need to limit occupational exposure of individuals to coarse and fine particles by enforcing effective engineering controls.

  16. The Effects of Data Collection Method and Monitoring of Workers’ Behavior on the Generation of Demolition Waste

    PubMed Central

    Cha, Gi-Wook; Kim, Young-Chan; Moon, Hyeun Jun; Hong, Won-Hwa

    2017-01-01

    The roles of both the data collection method (including proper classification) and the behavior of workers on the generation of demolition waste (DW) are important. By analyzing the effect of the data collection method used to estimate DW, and by investigating how workers’ behavior can affect the total amount of DW generated during an actual demolition process, it was possible to identify strategies that could improve the prediction of DW. Therefore, this study surveyed demolition waste generation rates (DWGRs) for different types of building by conducting on-site surveys immediately before demolition in order to collect adequate and reliable data. In addition, the effects of DW management strategies and of monitoring the behavior of workers on the actual generation of DW were analyzed. The results showed that when monitoring was implemented, the estimates of DW obtained from the DWGRs that were surveyed immediately before demolition and the actual quantities of DW reported by the demolition contractors had an error rate of 0.63% when the results were compared. Therefore, this study has shown that the proper data collection method (i.e., data were collected immediately before demolition) applied in this paper and monitoring on the demolition site have a significant impact on waste generation. PMID:29023378

  17. Managing Stormwater and Dust at Demolition Sites

    EPA Pesticide Factsheets

    Learn how to manage stormwater and dust at demolition sites, including developing a stormwater solution prevention plan, best practices for erosion, runoff and sediment control to reduce environmental impacts and comply with environmental regulations.

  18. Landlord project multi-year program plan, fiscal year 1999, WBS 1.5

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Dallas, M.D.

    The MYWP technical baseline describes the work to be accomplished by the Project and the technical standards which govern that work. The mission of Landlord Project is to provide more maintenance replacement of general infrastructure facilities and systems to facilitate the Hanford Site cleanup mission. Also, once an infrastructure facility or system is no longer needed the Landlord Project transitions the facility to final closure/removal through excess, salvage or demolition. Landlord Project activities will be performed in an environmentally sound, safe, economical, prudent, and reliable manner. The Landlord Project consists of the following facilities systems: steam, water, liquid sanitary waste,more » electrical distribution, telecommunication, sanitary landfill, emergency services, general purpose offices, general purpose shops, general purpose warehouses, environmental supports facilities, roads, railroad, and the site land. The objectives for general infrastructure support are reflected in two specific areas, (1) Core Infrastructure Maintenance, and (2) Infrastructure Risk Mitigation.« less

  19. Closure Report for Corrective Action Unit 117: Area 26 Pluto Disassembly Facility, Nevada Test Site, Nevada, Revision 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Mark Burmeister

    This Closure Report (CR) presents information supporting the closure of Corrective Action Unit (CAU) 117: Area 26 Pluto Disassembly Facility, Nevada Test Site, Nevada. This CR complies with the requirements of the Federal Facility Agreement and Consent Order that was agreed to by the State of Nevada; U.S. Department of Energy (DOE), Environmental Management; U.S. Department of Defense; and DOE, Legacy Management. Corrective Action Unit 117 comprises Corrective Action Site (CAS) 26-41-01, Pluto Disassembly Facility, located in Area 26 of the Nevada Test Site. The purpose of this CR is to provide documentation supporting the completed corrective actions and providemore » data confirming that the closure objectives for CAU 117 were met. To achieve this, the following actions were performed: • Review the current site conditions, including the concentration and extent of contamination. • Implement any corrective actions necessary to protect human health and the environment. • Properly dispose of corrective action and investigation wastes. • Document Notice of Completion and closure of CAU 117 issued by the Nevada Division of Environmental Protection. From May 2008 through February 2009, closure activities were performed as set forth in the Streamlined Approach for Environmental Restoration Plan for Corrective Action Unit 117, Area 26 Pluto Disassembly Facility, Nevada Test Site, Nevada. The purpose of the activities as defined during the data quality objectives process were: • Determine whether contaminants of concern (COCs) are present. • If COCs are present, determine their nature and extent, implement appropriate corrective actions, and properly dispose of wastes. Analytes detected during the closure activities were evaluated against final action levels to determine COCs for CAU 117. Assessment of the data generated from closure activities indicated that the final action levels were exceeded for polychlorinated biphenyls (PCBs) reported as total Aroclor and radium-226. A corrective action was implemented to remove approximately 50 cubic yards of PCB-contaminated soil, approximately 1 cubic foot of radium-226 contaminated soil (and scabbled asphalt), and a high-efficiency particulate air filter that was determined to meet the criteria of a potential source material (PSM). Electrical and lighting components (i.e., PCB-containing ballasts and capacitors) and other materials (e.g., mercury-containing thermostats and switches, lead plugs and bricks) assumed to be PSM were also removed from Building 2201, as practical, without the need for sampling. Because the COC contamination and PSMs have been removed, clean closure of CAS 26-41-01 is recommended, and no use restrictions are required to be placed on this CAU. No further action is necessary because no other contaminants of potential concern were found above preliminary action levels. The physical end state for Building 2201 is expected to be eventual demolition to slab. The DOE, National Nuclear Security Administration Nevada Site Office provides the following recommendations: • Clean closure is the recommended corrective action for CAS 26-41-01 in CAU 117. • A Notice of Completion to the DOE, National Nuclear Security Administration Nevada Site Office is requested from the Nevada Division of Environmental Protection for closure of CAU 117. • Corrective Action Unit 117 should be moved from Appendix III to Appendix IV of the Federal Facility Agreement and Consent Order.« less

  20. Characterizing the environmental impact of metals in construction and demolition waste.

    PubMed

    Yu, Danfeng; Duan, Huabo; Song, Qingbin; Li, Xiaoyue; Zhang, Hao; Zhang, Hui; Liu, Yicheng; Shen, Weijun; Wang, Jinben

    2018-05-01

    Large quantities of construction and demolition (C&D) waste are generated in China every year, but their potential environmental impacts on the surrounding areas are rarely assessed. This study focuses on metals contained in C&D waste, characterizing the metal concentrations and their related environmental risks. C&D waste samples were collected in Shenzhen City, China, from building demolition sites, renovation areas undergoing refurbishment, landfill sites, and recycling companies (all located in Shenzhen city) that produce recycled aggregate, in order to identify pollution levels of the metals As, Cd, Cr, Cu, Pb, Ni, and Zn. The results showed that (1) the metal concentrations in most demolition and renovation waste samples were below the soil environmental quality standard for agricultural purposes (SQ-Agr.) in China; (2) Cd, Cu, and Zn led to relatively higher environmental risks than other metals, especially for Zn (DM5 tile sample, 360 mg/kg; R4 tile sample, 281 mg/kg); (3) non-inert C&D waste such as wall insulation and foamed plastic had high concentrations of As and Cd, so that these materials required special attention for sound waste management; and (4) C&D waste collected from landfill sites had higher concentrations of Cd and Cu than did waste collected from demolition and refurbishment sites.

  1. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Carter, E.E.; Welty, B.D.

    Molten wax shows considerable promise as a fixative and dust control agent in demolition of radioactively contaminated facilities. Sticky molten wax, modified with special surfactants and wetting agents, is capable of not only coating materials but also penetrating into friable or dusty materials and making them incapable of becoming airborne during demolition. Wax also shows significant promise for stabilization of waste residuals that may be contained in buildings undergoing demolition. Some of the building materials that have been tested to date include concrete, wood, sheet rock, fiber insulation, lime, rock, and paper. Protective clothing, clay, sand, sulfur, and bentonite claymore » have been tested as surrogates for certain waste materials that may be encountered during building demolition. The paper describes several potential applications of molten wax for dust control in demolition of radioactive contaminated facilities. As a case-study, this paper describes a research test performed for a pipeline closure project being completed by the Idaho Cleanup Project at the Idaho National Laboratory. The project plans to excavate and remove a section of buried Duriron drain piping containing highly radioactive and friable and 'flighty' waste residuals. A full-scale pipeline mockup containing simulated waste was buried in sand to simulate the direct buried subsurface condition of the subject piping. The pipeline was pre-heated by drawing hot air through the line with a HEPA vacuum blower unit. Molten wax was pumped into the line and allowed to cool. The line was then broken apart in various places to evaluate the permeation performance of the wax. The wax fully permeated all the surrogate materials rendering them non-friable with a consistency similar to modeling clay. Based on the performance during the mockup, it is anticipated that the wax will be highly effective in controlling the spread of radiological contamination during pipe demolition activities. (authors)« less

  2. Correspondence about the Applicability of Asbestos NESHAP to Residential Demolition Projects

    EPA Pesticide Factsheets

    These correspondence about the asbestos NESHAP provide clarification on some demolition concerns such as the definition of a facility, the definition of site, and ownership applicability for renovations conducted on buildings after resale.

  3. Cost-Benefit Analysis on Countermeasures for Health Risk by Exposure to Asbestos in Japan

    NASA Astrophysics Data System (ADS)

    Fujinaga, Aiichiro; Hihara, Hidemi; Tatsuno, Makoto

    This study examines asbestos mitigation countermeasures by predicting air concentrations of asbestos, and then cost-benefit analyses is performed. A comparative study was conducted on three cases as follows; case one, demolition by machine & landfill, case two, demolition by hand & landfill, and case three demolition by hand & vitrification treatment. The results showed that if demolition by machine is continued, the risk is greater than 10-4 of upper acceptable risk for 2020. However, if demolition is conducted by hand, the risk is under 10-4 for 2010. And also, the risk will be less than 10-5 of the safety level for environmental standards until 2030. The results show that vitrification deletes the risk on future management at a landfill site, however at a higher cost.

  4. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Carter, E.E.

    Molten wax shows considerable promise as a fixative and dust control agent in demolition of radioactively contaminated facilities. Sticky molten wax, modified with special surfactants and wetting agents, is capable of not only coating materials but also penetrating into friable or dusty materials and making them incapable of becoming airborne during demolition. Wax also shows significant promise for stabilization of waste residuals that may be contained in buildings undergoing demolition. Some of the building materials that have been tested to date include concrete, wood, sheet-rock, fiber insulation, lime, rock, and paper. Protective clothing, clay, sand, sulfur, and bentonite clay havemore » been tested as surrogates for certain waste materials that may be encountered during building demolition. The paper describes several potential applications of molten wax for dust control in demolition of radioactive contaminated facilities. As a case-study, this paper describes a research test performed for a pipeline closure project being completed by the Idaho Cleanup Project at the Idaho National Laboratory. The project plans to excavate and remove a section of buried Duriron drain piping containing highly radioactive and friable and 'flighty' waste residuals. A full-scale pipeline mockup containing simulated waste was buried in sand to simulate the direct-buried subsurface condition of the subject piping. The pipeline was pre-heated by drawing hot air through the line with a HEPA vacuum blower unit. Molten wax was pumped into the line and allowed to cool. The line was then broken apart in various places to evaluate the permeation performance of the wax. The wax fully permeated all the surrogate materials rendering them non-friable with a consistency similar to modeling clay. Based on the performance during the mockup, it is anticipated that the wax will be highly effective in controlling the spread of radiological contamination during pipe demolition activities. A larger test was completed this year to simulate the work in more realistic conditions. (authors)« less

  5. Recovery Act Weekly Video: Upper ALE Building Demolition

    ScienceCinema

    None

    2017-12-11

    CH2MHILL Plateau Remediation Company demolition of 6652C Space Science Laboratory. The largest building atop Rattlesnake Mountain, the laboratory served as a nightly radar patrol center as well as a barracks. The Recovery Act funded project is helping reduce the site footprint.

  6. New Hires, Building Demolition

    ScienceCinema

    None

    2017-12-09

    Using Recovery Act funding, Department of Energy contractor CH2M HILL Plateau Remediation Company has hired hundreds of new employees to do cleanup work at the Hanford Site, including demolition of dozens of excess facilities.This video was produced by CH2M HILL on Jan. 8, 2010.

  7. Successful Demolition of Historic Cape Canaveral Air Force Station Launch Facilities: Managing the Process to Maximize Recycle Value to Fund Demolition

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Jones, A.; Hambro, L.; Hooper, K.

    2008-07-01

    This paper will present the history of the Atlas 36 and Titan 40 Space Launch Complexes (SLC), the facility assessment process, demolition planning, recycle methodology, and actual facility demolition that resulted in a 40% reduction in baseline cost. These two SLC launched hundreds of payloads into space from Cape Canaveral Air Force Station (AFS), Florida. The Atlas-Centaur family of rockets could lift small- to medium-size satellites designed for communications, weather, or military use, placing them with near pinpoint accuracy into their intended orbits. The larger Titan family was relied upon for heavier lifting needs, including launching military satellites as wellmore » as interplanetary probes. But despite their efficiency and cost-effectiveness, the Titan rockets, as well as earlier generation Atlas models, were retired in 2005. Concerns about potential environmental health hazards from PCBs and lead-based paint chipping off the facilities also contributed to the Air Force's decision in 2005 to dismantle and demolish the Atlas and Titan missile-launching systems. Lockheed Martin secured the complex following the final launch, removed equipment and turned over the site to the Air Force for decommissioning and demolition (D and D). AMEC was retained by the Air Force to perform demolition planning and facility D and D in 2004. AMEC began with a review of historical information, interviews with past operations personnel, and 100% facility assessment of over 100 structures. There where numerous support buildings that due to their age contained asbestos containing material (ACM), PCB-impacted material, and universal material that had to be identified and removed prior to demolition. Environmental testing had revealed that the 36B mobile support tower (MST) exceeded the TSCA standard for polychlorinated biphenyls (PCB) paint (<50 ppm), as did the high bay sections of the Titan Vertical Integration Building (VIB). Thus, while most of the steel structures could be completely recycled, about one-third of 36B MST and the affected areas of the VIB were to be consigned to an on-site regulated waste landfill. In all, it is estimated that approximately 10,000,000 kg (11,000 tons) of PCB-coated steel will be land-filled and 23,000,000 kg (25,000 tons) will be recycled. The recycling of the steel and other materials made it possible to do additional demolition by using these funds. Therefore, finding ways to maximize the recycle value of materials became a key factor in the pre-demolition characterization and implementation strategy. This paper will present the following: - Critical elements in demolition planning working at an active launch facility; - Characterization and strategy to maximize steel recycle; - Waste disposition strategy to maximize recycle/reuse and minimize disposal; - Recycle options available at DOD installations that allow for addition funds for demolition; - Innovation in demolition methodologies for large structures - explosive demolition and large-scale dismantlement; - H and S aspects of explosive demolition and large scale dismantlement. In conclusion: The Cape Canaveral AFS Demolition Program has been a great success due to the integration of multiple operations and contractors working together to determine the most cost-effective demolition methods. It is estimated that by extensive pre-planning and working with CCAFS representatives, as well as maximizing the recycle credits of various material, primarily steel, that the government will be able to complete what was base-lined to be a $30 M demolition program for < $20 M. Other factors included a competitive subcontractor environment where they were encouraged with incentives to maximize recycle/reuse of material and creative demolition solutions. Also, by overlapping multiple demolition tasks at multiple facilities allowed for a reduction in field oversight. (authors)« less

  8. Centrifugal shot blasting. Innovative technology summary report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1999-07-01

    At the US Department of Energy (DOE) Fernald Environmental Management Project (FEMP), the Facilities Closure and Demolition Projects Integrated Remedial Design/Remedial Action (RD/RA) work plan calls for the removal of one inch (1 in) depth of concrete surface in areas where contamination with technetium-99 has been identified. This report describes a comparative demonstration between two concrete removal technologies: an innovative system using Centrifugal Shot Blasting (CSB) and a modified baseline technology called a rotary drum planer.

  9. Nuclear Rocket Facility Decommissioning Project: Controlled Explosive Demolition of Neutron Activated Shield Wall

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Michael R. Kruzic

    2007-09-16

    Located in Area 25 of the Nevada Test Site (NTS), the Test Cell A (TCA) Facility was used in the early to mid-1960s for the testing of nuclear rocket engines, as part of the Nuclear Rocket Development Program, to further space travel. Nuclear rocket testing resulted in the activation of materials around the reactors and the release of fission products and fuel particles in the immediate area. Identified as Corrective Action Unit 115, the TCA facility was decontaminated and decommissioned (D&D) from December 2004 to July 2005 using the Streamlined Approach for Environmental Restoration (SAFER) process, under the ''Federal Facilitymore » Agreement and Consent Order''. The SAFER process allows environmental remediation and facility closure activities (i.e., decommissioning) to occur simultaneously provided technical decisions are made by an experienced decision maker within the site conceptual site model, identified in the Data Quality Objective process. Facility closure involved a seven-step decommissioning strategy. Key lessons learned from the project included: (1) Targeted preliminary investigation activities provided a more solid technical approach, reduced surprises and scope creep, and made the working environment safer for the D&D worker. (2) Early identification of risks and uncertainties provided opportunities for risk management and mitigation planning to address challenges and unanticipated conditions. (3) Team reviews provided an excellent mechanism to consider all aspects of the task, integrated safety into activity performance, increase team unity and ''buy-in'' and promoted innovative and time saving ideas. (4) Development of CED protocols ensured safety and control. (5) The same proven D&D strategy is now being employed on the larger ''sister'' facility, Test Cell C.« less

  10. DEMOLISHING A COLD WARE ERA FULE STORAGE BASIN SUPERSTRUCTURE LADEN WITH ASBESTOS

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    LLOYD ER; STEVENS JM; DAGAN EB

    The K East (KE) Basin facilities are located near the north end of the Hanford Site's 100 K area. The facilities were built in 1950 as part of the KE Reactor complex and constructed within 400 meters of the Columbia River, which is the largest river in the Pacific Northwest and by volume the fourth largest river in the United States. The basin, located adjacent to the reactor, was used for the underwater storage of irradiated nuclear fuel discharged from the reactor. The basin was covered by a superstructure comprising steel columns and beams, concrete, and cement asbestos board (CAB)more » siding. The project's mission was to complete demolition of the structure over the KE Basin within six months of turnover from facility deactivation activities. The demolition project team applied open-air demolition techniques to bring the facility to slab-on-grade. Several innovative techniques were used to control contamination and maintain contamination control within the confines of the demolition exclusion zone. The techniques, which focused on a defense-in-depth approach, included spraying fixatives on interior and exterior surfaces before demolition began; applying fixatives during the demolition; misting using a fine spray of water during demolition; and demolishing the facility systematically. Another innovative approach that made demolition easier was to demolish the building with the non-friable CAB remaining in place. The CAB siding covered the exterior of the building and portions of the interior walls, and was an integral part of the multiple-layered roof. The project evaluated the risks involved in removing the CAB material in a radiologically contaminated environment and determined that radiological dose rates and exposure to radiological contamination and industrial hazards would be significantly reduced by using heavy equipment to remove the CAB during demolition. The ability to perform this demolition safely and without spreading contamination (radiological or asbestos) demonstrates that contaminated structures can be torn down successfully using similar open-air demolition techniques.« less

  11. Damage Assessment Map from Interferometric Coherence

    NASA Astrophysics Data System (ADS)

    Yun, S.; Fielding, E. J.; Simons, M.; Rosen, P. A.; Owen, S. E.; Webb, F.

    2010-12-01

    Large earthquakes cause buildings to collapse, which often claims the lives of many. For example, 2010 Haiti earthquake killed about 230,000 people, with about 280,000 buildings collapsed or severely damaged. When a major earthquake hits an urban area, one of the most critical information for rescue operations is rapid and accurate assessment of building-collapse areas. From a study on 2003 Bam earthquake in Iran, interferometric coherence was proved useful for earthquake damage assessment (Fielding et al., 2005) when similar perpendicular baselines can be found for pre- and coseismic interferometric pairs and when there is little temporal and volume decorrelation. In this study we develop a new algorithm to create a more robust and accurate damage assessment map using interferometric coherence despite different interferometric baselines and with other decorrelation sources. We test the algorithm on a building block that recently underwent demolition, which is a proxy for building collapse due to earthquakes, for new construction in the City of Pasadena, California. The size of the building block is about 150 m E-W and 300 m N-S, and the demolition project started on April 23, 2007 and continued until January 22, 2008. After we process Japanese L-band ALOS PALSAR data with ROI_PAC, an interferometric coherence map that spans the demolition period is registered to a coherence map before the demolition, and the relative bias of the coherence values are removed, then a causality constraint is applied to enhance the change due to demolition. The results show clear change in coherence at the demolition site. We improve the signal-to-noise ratio of the coherence change at the demolition site from 17.3 (for simple difference) to 44.6 (with the new algorithm). The damage assessment map algorithm will become more useful with the emergence of InSAR missions with more frequent data acquisition, such as Sentinel-1 and DESDynI.

  12. Life cycle assessment of the end-of-life phase of a residential building.

    PubMed

    Vitale, Pierluca; Arena, Noemi; Di Gregorio, Fabrizio; Arena, Umberto

    2017-02-01

    The study investigates the potential environmental impacts related to the end-of-life phase of a residential building, identified in a multifamily dwelling of three levels, constructed in the South of Italy by utilizing conventional materials and up-to-date procedures. An attributional life cycle assessment has been utilised to quantify the contributions of each stage of the end-of-life phase, with a particular attention to the management of the demolition waste. The investigation takes into account the selective demolition, preliminary sorting and collection of main components of the building, together with the processes of sorting, recycling and/or disposal of main fractions of the demolition waste. It quantifies the connections between these on-site and off-site processes as well as the main streams of materials sent to recycling, energy recovery, and final disposal. A sensitivity analysis has been eventually carried out by comparing the overall environmental performances of some alternative scenarios, characterised by different criteria for the demolition of the reference building, management of demolition waste and assessment of avoided burdens of the main recycled materials. The results quantify the advantage of an appropriate technique of selective demolition, which could increase the quality and quantity of residues sent to the treatment of resource recovery and safe disposal. They also highlight the contributions to the positive or negative environmental impact of each stage of the investigated waste management system. The recycling of reinforcing steel appears to play a paramount role, accounting for 65% of the total avoided impacts related to respiratory inorganics, 89% of those for global warming and 73% of those for mineral extraction. Copyright © 2016 Elsevier Ltd. All rights reserved.

  13. DEMOLISHING A COLD-WAR-ERA FUEL STORAGE BASIN SUPERSTRUCTURE LADEN WITH ASBESTOS

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    LLOYD ER; ORGILL TK; DAGAN EB

    The K East (KE) Basin facilities are located near the north end of the Hanford Site's 100 K area. The facilities were built in 1950 as part of the KE Reactor complex and constructed within 400 meters of the Columbia River, which is the largest river in the Pacific Northwest and by volume the fourth largest river in the United States. The basin, located adjacent to the reactor, was used for the underwater storage of irradiated nuclear fuel discharged from the reactor. The basin was covered by a superstructure comprising steel columns and beams, concrete, and cement asbestos board (CAB)more » siding. The project's mission was to complete demolition of the structure over the K East basin within six months of tumover from facility deactivation activities. The demolition project team implemented open-air demolition techniques to demolish the facility to slab-on-grade. Several innovative techniques were used to control contamination and maintain contamination control within the confines of the demolition exclusion zone. The techniques, which focused on a defense-in-depth approach, included spraying fixatives on interior and exterior surfaces before demolition began; applying fixatives; misting using a fine spray of water during demolition; and demolishing the facility systematically. Another innovation that aided demolition was to demolish the building with the non-friable CAB remaining in place. The CAB siding covered the exterior of the building, portions of the interior walls, and was an integral part of the multiple layered roof. The project evaluated the risks involved in removing the CAB material in a radiologically contaminated environment and determined that radiological dose rates and exposure to radiological contamination and industrial hazards would be significantly reduced by removing the CAB during demolition using heavy equipment. The ability to perform this demolition safely and without spreading contamination (radiological or asbestos) demonstrates that similar open-air demolition ofcontaminated structures can be performed successfully.« less

  14. Technical and Regulatory Considerations in Using Freight Containers as Industrial Packages

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hawk, Mark B; Opperman, Erich; Natali, Ronald

    2008-01-01

    The US Department of Energy (DOE), Office of Environmental Management (EM), is actively pursuing activities to reduce the radiological risk and clean up the environmental legacy of the nation's nuclear weapons programmes. The EM has made significant progress in recent years in the clean-up and closure of sites and is also focusing on longer term activities necessary for the completion of the clean-up programme. The packaging and transportation of contaminated demolition debris and low level waste materials in a safe and cost effective manner are essential in completing this mission. Toward this end, the US Department of Transportation's Final Rulemore » on Hazardous Materials Regulation issued on 26 January 2004, included a new provision authorising the use of freight containers (e.g. 20 and 40 ft ISO containers) as industrial packages type 2 or 3. This paper will discuss the technical and regulatory considerations in using these newly authorised and large packages for the packaging and transportation of low level waste materials.« less

  15. Environmental Assessment for Building 104 Demolition, Rome Research Site, Griffis Business and Technology Park Rome, Oneida County, New York

    DTIC Science & Technology

    2012-11-01

    a penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. 1. REPORT DATE NOV...2012 2. REPORT TYPE 3. DATES COVERED 00-00-2012 to 00-00-2012 4. TITLE AND SUBTITLE Environmental Assessment for Building 104 Demolition Rome...4 C. Earth Resources, Geology and Soils

  16. Completion of the decommissioning of a former active handling building at UKAEA Winfrith

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Brown, N.; Parkinson, S.J.; Cornell, R.M.

    2007-07-01

    Since July 2000, NUKEM Limited has been carrying out the full decommissioning of a former Active Handling Building A59 at Winfrith in Dorset under contract from the nuclear site licence holder, UKAEA. Work has generally centred upon clearance and decontamination of the two heavily shielded suites of caves originally used to carry out remote examination of irradiated nuclear fuel elements although a number of other supporting facilities are also involved. This work has proceeded successfully to completion following extensive decontamination of the caves and associated facilities and has been followed by the recent demolition of the main containment building structure.more » This has permitted a start to be made on the demolition of the two heavily shielded suites of caves which is to be followed by removal of the building slab and restoration of the site. This paper reviews some of the significant tasks undertaken during the past year in preparation for the building and cave line demolition operations. It also reviews the building structure removal and recent progress made with the demolition of the two heavily reinforced concrete cave lines. The procedure used for monitoring the concrete debris from the cave lines has had to be revised during these operations and the reasons for this and a temporary delay in the cave line demolition will be discussed in the context of the remaining sections of the programme. This decommissioning programme has been achieved throughout by the employment of a non-adversarial team working approach between client and contractor. This has been instrumental in developing cost-effective and safe solutions to a range of problems during the programme, demonstrating the worth of adopting this co-operative approach for mutual benefit. (authors)« less

  17. Construction and demolition waste indicators.

    PubMed

    Mália, Miguel; de Brito, Jorge; Pinheiro, Manuel Duarte; Bravo, Miguel

    2013-03-01

    The construction industry is one of the biggest and most active sectors of the European Union (EU), consuming more raw materials and energy than any other economic activity. Furthermore, construction waste is the commonest waste produced in the EU. Current EU legislation sets out to implement construction and demolition waste (CDW) prevention and recycling measures. However it lacks tools to accelerate the development of a sector as bound by tradition as the building industry. The main objective of the present study was to determine indicators to estimate the amount of CDW generated on site both globally and by waste stream. CDW generation was estimated for six specific sectors: new residential construction, new non-residential construction, residential demolition, non-residential demolition, residential refurbishment, and non-residential refurbishment. The data needed to develop the indicators was collected through an exhaustive survey of previous international studies. The indicators determined suggest that the average composition of waste generated on site is mostly concrete and ceramic materials. Specifically for new residential and new non-residential construction the production of concrete waste in buildings with a reinforced concrete structure lies between 17.8 and 32.9 kg m(-2) and between 18.3 and 40.1 kg m(-2), respectively. For the residential and non-residential demolition sectors the production of this waste stream in buildings with a reinforced concrete structure varies from 492 to 840 kg m(-2) and from 401 to 768 kg/m(-2), respectively. For the residential and non-residential refurbishment sectors the production of concrete waste in buildings lies between 18.9 and 45.9 kg/m(-2) and between 18.9 and 191.2 kg/m(-2), respectively.

  18. OPEN AIR DEMOLITION OF FACILITIES HIGHLY CONTAMINATED WITH PLUTONIUM

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    LLOYD, E.R.

    2007-05-31

    The demolition of highly contaminated plutonium buildings usually is a long and expensive process that involves decontaminating the building to near free- release standards and then using conventional methods to remove the structure. It doesn't, however, have to be that way. Fluor has torn down buildings highly contaminated with plutonium without excessive decontamination. By removing the select source term and fixing the remaining contamination on the walls, ceilings, floors, and equipment surfaces; open-air demolition is not only feasible, but it can be done cheaper, better (safer), and faster. Open-air demolition techniques were used to demolish two highly contaminated buildings tomore » slab-on-grade. These facilities on the Department of Energy's Hanford Site were located in, or very near, compounds of operating nuclear facilities that housed hundreds of people working on a daily basis. To keep the facilities operating and the personnel safe, the projects had to be creative in demolishing the structures. Several key techniques were used to control contamination and keep it within the confines of the demolition area: spraying fixatives before demolition; applying fixative and misting with a fine spray of water as the buildings were being taken down; and demolishing the buildings in a controlled and methodical manner. In addition, detailed air-dispersion modeling was done to establish necessary building and meteorological conditions and to confirm the adequacy of the proposed methods. Both demolition projects were accomplished without any spread of contamination outside the modest buffer areas established for contamination control. Furthermore, personnel exposure to radiological and physical hazards was significantly reduced by using heavy equipment rather than ''hands on'' techniques.« less

  19. Asbestos release from whole-building demolition of buildings with asbestos-containing material.

    PubMed

    Perkins, Robert A; Hargesheimer, John; Fourie, Walter

    2007-12-01

    The whole-building demolition method, which entails one-or two-story buildings pushed down by heavy equipment, loaded into trucks, and hauled away, is generally the most cost-effective means to remove small buildings. For taller buildings, a crane and wrecking ball may be used initially to reduce the height of the building. Demolitions might release asbestos fibers from friable asbestos-containing material (ACM). Fibers also might be released from nominally nonfriable ACM (Categories I and II nonfriable ACM) if it becomes friable after rough handling throughout the whole-building demolition process. This paper reports on asbestos air monitoring from two demolition projects involving ACM. In one building, Category II nonfriable ACM was present because it could not be removed safely prior to demolition. Both projects had large quantities of gypsum wallboard with ACM joint compound and ACM flooring. One building had large quantities of ACM spray-on ceiling material. During the demolitions personal air monitoring of the workers and area air monitoring downwind and around the sites were conducted. The monitoring found the concentrations of fibers detected by phase contrast microscopy were generally well below the permissible exposure limits (PEL) of workers. Electron microcopy analysis of samples at or near the PEL indicated most of the fibers were not asbestos, and the actual asbestos exposure was often below the detection limit of the procedure. The buildings were kept wet with fire hoses during the demolition and that required large quantities of water, 20,000-60,000 gal/day (75-225 m(3)/day). Earlier studies found little asbestos release from buildings containing only nonfriable ACM demolished by this method. This project found a negligible release of asbestos fibers, despite the presence of nonfriable materials that might become friable, such as ACM joint compound and spray-on ACM ceiling coating.

  20. Better anatomical and cosmetic results using tunneled lotus petal flap for plastic reconstruction after demolitive surgery for vulvar malignancy.

    PubMed

    Buda, Alessandro; Confalonieri, Pier Luigi; Rovati, Luca Carlo Vittorio; Fruscio, Robert; Giuliani, Daniela; Signorelli, Mauro; Dell'Anna, Tiziana; Pirovano, Cecilia; Milani, Rodolfo

    2012-06-01

    To evaluate the efficacy of tunneled lotus petal flap in terms of anatomical and cosmetic results in patients who underwent vulvoperineal reconstruction for vulvar malignancy. Between March 2010 and July 2011, 22 women underwent vulvoperineal reconstruction using tunneled lotus petal flap for primary or recurrent disease at San Gerardo Hospital, Monza. In 16 cases, lotus flaps were bilateral, whereas in 6 cases, they were monolateral. The median age was 72 years (range, 53-87 years). The mean operating time was 85 minutes. The mean length of follow-up was 10 months (range, 2-16 months). Postoperative complications occurred in 2 patients, including one case of partial flap necrosis and one case of donor site breakdown. Tunneled lotus petal flap is safe, easy and fast to perform, has a low rate of complications, and good functional and cosmetic results. This technique represents an optimal solution for plastic reconstruction in case of primary or recurrent vulvar disease, or in case of introital stenosis after primary inadequate closure.

  1. TECHNICAL AND REGULATORY CONSIDERATIONS IN USING FREIGHT CONTAINERS AS INDUSTRIAL PACKAGES

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Opperman, E; Mark Hawk, M; Ron Natali, R

    2007-10-16

    The United States (US) Department of Energy (DOE), Office of Environmental Management (EM), is actively pursuing activities to reduce the radiological risk and clean up the environmental legacy of the nation's nuclear weapons programs. EM has made significant progress in recent years in the clean-up and closure of sites and is also focusing on longer-term activities necessary for the completion of the clean-up program. The packaging and transportation of contaminated demolition debris and low-level waste (LLW) materials in a safe and cost-effective manner are essential in completing this mission. Toward this end, the US Department of Transportation's (DOT) Final Rulemore » on Hazardous Materials Regulation Final Rule issued January 26, 2004, included a new provision authorizing the use of Freight Containers (e.g., 20 and 40-foot ISO Containers) as Industrial Packages Type 1, 2, or 3 (IP-1, IP-2, and IP-3). This paper will discuss the technical and regulatory considerations in using these newly authorized and large packages for the packaging and transportation of LLW materials.« less

  2. Construction and demolition waste generation rates for high-rise buildings in Malaysia.

    PubMed

    Mah, Chooi Mei; Fujiwara, Takeshi; Ho, Chin Siong

    2016-12-01

    Construction and demolition waste continues to sharply increase in step with the economic growth of less developed countries. Though the construction industry is large, it is composed of small firms with individual waste management practices, often leading to the deleterious environmental outcomes. Quantifying construction and demolition waste generation allows policy makers and stakeholders to understand the true internal and external costs of construction, providing a necessary foundation for waste management planning that may overcome deleterious environmental outcomes and may be both economically and environmentally optimal. This study offers a theoretical method for estimating the construction and demolition project waste generation rate by utilising available data, including waste disposal truck size and number, and waste volume and composition. This method is proposed as a less burdensome and more broadly applicable alternative, in contrast to waste estimation by on-site hand sorting and weighing. The developed method is applied to 11 projects across Malaysia as the case study. This study quantifies waste generation rate and illustrates the construction method in influencing the waste generation rate, estimating that the conventional construction method has a waste generation rate of 9.88 t 100 m -2 , the mixed-construction method has a waste generation rate of 3.29 t 100 m -2 , and demolition projects have a waste generation rate of 104.28 t 100 m -2 . © The Author(s) 2016.

  3. 7 CFR 3201.68 - Erosion control materials.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... MANAGEMENT, DEPARTMENT OF AGRICULTURE GUIDELINES FOR DESIGNATING BIOBASED PRODUCTS FOR FEDERAL PROCUREMENT... manufactured for use on construction, demolition, or other sites to prevent wind or water erosion of loose...

  4. 7 CFR 3201.68 - Erosion control materials.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... MANAGEMENT, DEPARTMENT OF AGRICULTURE GUIDELINES FOR DESIGNATING BIOBASED PRODUCTS FOR FEDERAL PROCUREMENT... manufactured for use on construction, demolition, or other sites to prevent wind or water erosion of loose...

  5. 7 CFR 3201.68 - Erosion control materials.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... MANAGEMENT, DEPARTMENT OF AGRICULTURE GUIDELINES FOR DESIGNATING BIOBASED PRODUCTS FOR FEDERAL PROCUREMENT... manufactured for use on construction, demolition, or other sites to prevent wind or water erosion of loose...

  6. Municipal Solid Waste Landfills and Wood Pallets - What's Happening in the United States

    Treesearch

    Philip A. Araman; Robert J. Bush; Vijay S. Reddy

    1997-01-01

    This article on pallet disposal and Municipal Solid Waste sites includes material presented by Dr. Bush at the recent NWPCA Recycling Meeting. This is the first in a two-part series; the second discusses pallet disposal in construction and demolition sites.

  7. ICPP tank farm closure study. Volume 2: Engineering design files

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1998-02-01

    Volume 2 contains the following topical sections: Tank farm heel flushing/pH adjustment; Grouting experiments for immobilization of tank farm heel; Savannah River high level waste tank 20 closure; Tank farm closure information; Clean closure of tank farm; Remediation issues; Remote demolition techniques; Decision concerning EIS for debris treatment facility; CERCLA/RCRA issues; Area of contamination determination; Containment building of debris treatment facility; Double containment issues; Characterization costs; Packaging and disposal options for the waste resulting from the total removal of the tank farm; Take-off calculations for the total removal of soils and structures at the tank farm; Vessel off-gas systems; Jet-groutedmore » polymer and subsurface walls; Exposure calculations for total removal of tank farm; Recommended instrumentation during retrieval operations; High level waste tank concrete encasement evaluation; Recommended heavy equipment and sizing equipment for total removal activities; Tank buoyancy constraints; Grout and concrete formulas for tank heel solidification; Tank heel pH requirements; Tank cooling water; Evaluation of conservatism of vehicle loading on vaults; Typical vault dimensions and approximately tank and vault void volumes; Radiological concerns for temporary vessel off-gas system; Flushing calculations for tank heels; Grout lift depth analysis; Decontamination solution for waste transfer piping; Grout lift determination for filling tank and vault voids; sprung structure vendor data; Grout flow properties through a 2--4 inch pipe; Tank farm load limitations; NRC low level waste grout; Project data sheet calculations; Dose rates for tank farm closure tasks; Exposure and shielding calculations for grout lines; TFF radionuclide release rates; Documentation of the clean closure of a system with listed waste discharge; and Documentation of the ORNL method of radionuclide concentrations in tanks.« less

  8. Corrective Action Decision Document/Closure Report for Corrective Action Unit 105: Area 2 Yucca Flat Atmospheric Test Sites, Nevada National Security Site, Nevada, Revision 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Matthews, Patrick

    2013-09-01

    This Corrective Action Decision Document/Closure Report presents information supporting the closure of Corrective Action Unit (CAU) 105: Area 2 Yucca Flat Atmospheric Test Sites, Nevada National Security Site, Nevada. CAU 105 comprises the following five corrective action sites (CASs): -02-23-04 Atmospheric Test Site - Whitney Closure In Place -02-23-05 Atmospheric Test Site T-2A Closure In Place -02-23-06 Atmospheric Test Site T-2B Clean Closure -02-23-08 Atmospheric Test Site T-2 Closure In Place -02-23-09 Atmospheric Test Site - Turk Closure In Place The purpose of this Corrective Action Decision Document/Closure Report is to provide justification and documentation supporting the recommendation that nomore » further corrective action is needed for CAU 105 based on the implementation of the corrective actions. Corrective action investigation (CAI) activities were performed from October 22, 2012, through May 23, 2013, as set forth in the Corrective Action Investigation Plan for Corrective Action Unit 105: Area 2 Yucca Flat Atmospheric Test Sites; and in accordance with the Soils Activity Quality Assurance Plan, which establishes requirements, technical planning, and general quality practices.« less

  9. 48 CFR 22.402 - Applicability.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... performed by laborers and mechanics at the site of the work; (ii) To dismantling, demolition, or removal of... of an existing structure. (2) The requirements of this subpart do not apply to— (i) The manufacturing...

  10. 48 CFR 22.402 - Applicability.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... performed by laborers and mechanics at the site of the work; (ii) To dismantling, demolition, or removal of... of an existing structure. (2) The requirements of this subpart do not apply to— (i) The manufacturing...

  11. 48 CFR 22.402 - Applicability.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... performed by laborers and mechanics at the site of the work; (ii) To dismantling, demolition, or removal of... of an existing structure. (2) The requirements of this subpart do not apply to— (i) The manufacturing...

  12. 48 CFR 22.402 - Applicability.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... performed by laborers and mechanics at the site of the work; (ii) To dismantling, demolition, or removal of... of an existing structure. (2) The requirements of this subpart do not apply to— (i) The manufacturing...

  13. Occupational exposure to dioxins by thermal oxygen cutting, welding, and soldering of metals.

    PubMed

    Menzel, H M; Bolm-Audorff, U; Turcer, E; Bienfait, H G; Albracht, G; Walter, D; Emmel, C; Knecht, U; Päpke, O

    1998-04-01

    This paper focuses on one aspect of occupational dioxin exposure that is novel and unexpected. Exposures in excess of the German threshold limit value of 50 pg international toxicity equivalent (I-TEQ)/m3 are very frequent, unpredictable, and sometimes very high--up to 6612 pg I-TEQ/m3--during thermal oxygen cutting at scrap metal and demolition sites. The same procedure involving virgin steel in steel trade and mass production of steel objects gave no such evidence, even though no final conclusions can be drawn because of the low number of samples analyzed. Low dioxin exposures during inert gas electric arc welding confirm previous literature findings, whereas soldering and thermal oxygen cutting in the presence of polyvinyl chloride give rise to concern. The consequences of occupational dioxin exposure were studied by analysis of the dioxin-blood concentration, the body burden, of men performing thermal oxygen cutting at scrap metal reclamation and demolition sites, in steel trade and producing plants as well as for industrial welders and white-collar workers. The results concerning body burdens are in excellent agreement with the dioxin exposure as characterized by dioxin air concentration in the workplace. The significant positive correlation between duration and frequency of performing thermal oxygen cutting at metal reclamation and demolition sites expressed in job-years and dioxin body burden speaks for the occupational origin of the observed overload after long times. The results reported here lead to consequences for occupational health, which are discussed and require immediate attention.

  14. Assessing metal contamination from construction and demolition (C&D) waste used to infill wetlands: using Deroceras reticulatum (Mollusca: Gastropoda).

    PubMed

    Staunton, John A; Mc Donnell, Rory J; Gormally, Michael J; Williams, Chris D; Henry, Tiernan; Morrison, Liam

    2014-11-01

    Large quantities of construction and demolition waste (C&D) are produced globally every year, with little known about potential environmental impacts. In the present study, the slug, Deroceras reticulatum (Mollusca: Gastropoda) was used as the first biomonitor of metals (Ag, As, Ba, Cd, Co, Cr, Cu, Mn, Mo, Ni, Pb, Sb, Se, Ti, Tl, V and Zn) on wetlands post infilling with construction and demolition (C&D) waste. The bioaccumulation of As, Ba, Cd, Co, Sb, Se and Tl were found to be significantly elevated in slugs collected on C&D waste when compared to unimproved pastures (control sites), while Mo, Se and Sr had significantly higher concentrations in slugs collected on C&D waste when compared to known contaminated sites (mining locations), indicating the potential hazardous nature of C&D waste to biota. Identifying exact sources for these metals within the waste can be problematic, due to its heterogenic nature. Biomonitors are a useful tool for future monitoring and impact studies, facilitating policy makers and regulations in other countries regarding C&D waste infill. In addition, improving separation of C&D waste to allow increased reuse and recycling is likely to be effective in reducing the volume of waste being used as infill, subsequently decreasing potential metal contamination.

  15. Sustainable Community Case Study: An Assessment of EPA’s Sustainable Development Plan for Stella, Missouri

    EPA Science Inventory

    In 2006, citizens of Stella, Missouri asked the EPA for technical assistance in demolition and site remediation of an abandoned hospital; and how to redevelop the site to help the community be more sustainable. EPA Region 7 teamed with EPA Office of Research and Development (ORD...

  16. 78 FR 23837 - Cranes and Derricks in Construction: Underground Construction and Demolition

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-23

    ... report here the results for the entire heavy-and-civil engineering sector and the entire site... in this final rule because employers included in the heavy-and-civil engineering sector, or the site... final rule. This final rule affects two construction sectors: NAICS 237990 (Other Heavy and Civil...

  17. On the prevailing construction waste recycling practices: a South East Queensland study.

    PubMed

    Tam, Vivian W Y; Kotrayothar, Duangthidar; Loo, Yew-Chaye

    2009-03-01

    Waste generated from construction and building demolition work constitutes about 68% of all solid waste generated each year in South East Queensland. Consequently, it has created a serious waste management problem. The State Governments of Victoria and New South Wales have been encouraging the use of recycled materials from construction and related waste; they have also promulgated specifications for their use. In Queensland, however, similar regulations are not anticipated in the near future, which explains the lack of funded research conducted in this important arena. This paper presents an evaluation of the prevailing waste recycling practices in Queensland. Nine sites were visited, including two construction sites, three demolition sites, three recycling plants and one landfill in South East Queensland. The difficulties encountered by the recycling programme operators and their associates at these sites are described and the benefits of recycling construction materials are presented. One of the major barriers is that the local councils disallow the use of recycled materials in new construction work. To help rectify these impediments to recycling, recommendations are given to increase the use of recycled construction waste in South East Queensland.

  18. Commercial Decommissioning at DOE's Rocky Flats

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Freiboth, C.; Sandlin, N.; Schubert, A.

    2002-02-25

    Due in large part to the number of nuclear facilities that make up the DOE complex, DOE-EM work has historically been paperwork intensive and driven by extensive regulations. Requirements for non-nuclear facilities are often grouped with those of nuclear facilities, driving up costs. Kaiser-Hill was interested in applying a commercial model to demolition of these facilities and wanted to apply necessary and sufficient standards to the work activities, but avoid applying unnecessary requirements. Faced with demolishing hundreds of uncontaminated or non-radiologically contaminated facilities, Kaiser-Hill has developed a subcontracting strategy to drastically reduce the cost of demolishing these facilities at Rockymore » Flats. Aiming to tailor the demolition approach of such facilities to more closely follow commercial practices, Kaiser-Hill recently released a Request for Proposals (RFP) for the demolition of the site's former central administration facility. The RFP significantly reduced requirements for compliance with specific DOE directives. Instead, the RFP required subcontractors to comply with health and safety requirements commonly found in the demolition of similar facilities in a commercial setting. This resulted in a number of bids from companies who have normally not bid on DOE work previously and at a reduced cost over previous approaches. This paper will discuss the details of this subcontracting strategy.« less

  19. Distribution of materials in construction and demolition waste in Portugal.

    PubMed

    Coelho, André; de Brito, Jorge

    2011-08-01

    It may not be enough simply to know the global volume of construction and demolition waste (CDW) generated in a certain region or country if one wants to estimate, for instance, the revenue accruing from separating several types of materials from the input entering a given CDW recycling plant. A more detailed determination of the distribution of the materials within the generated CDW is needed and the present paper addresses this issue, distinguishing different buildings and types of operation (new construction, retrofitting and demolition). This has been achieved by measuring the materials from buildings of different ages within the Portuguese building stock, and by using direct data from demolition/retrofitting sites and new construction average values reported in the literature. An attempt to establish a benchmark with other countries is also presented. This knowledge may also benefit industry management, especially that related to CDW recycling, helping to optimize procedures, equipment size and operation and even industrial plant spatial distribution. In an extremely competitive market, where as in Portugal low-tech and high environmental impact procedures remain the norm in the construction industry (in particular, the construction waste industry), the introduction of a successful recycling industry is only possible with highly optimized processes and based on a knowledge-based approach to problems.

  20. Estimation of regional building-related C&D debris generation and composition: case study for Florida, US.

    PubMed

    Cochran, Kimberly; Townsend, Timothy; Reinhart, Debra; Heck, Howell

    2007-01-01

    Methodology for the accounting, generation, and composition of building-related construction and demolition (C&D) at a regional level was explored. Six specific categories of debris were examined: residential construction, nonresidential construction, residential demolition, nonresidential demolition, residential renovation, and nonresidential renovation. Debris produced from each activity was calculated as the product of the total area of activity and waste generated per unit area of activity. Similarly, composition was estimated as the product of the total area of activity and the amount of each waste component generated per unit area. The area of activity was calculated using statistical data, and individual site studies were used to assess the average amount of waste generated per unit area. The application of the methodology was illustrated using Florida, US approximately 3,750,000 metric tons of building-related C&D debris were estimated as generated in Florida in 2000. Of that amount, concrete represented 56%, wood 13%, drywall 11%, miscellaneous debris 8%, asphalt roofing materials 7%, metal 3%, cardboard 1%, and plastic 1%. This model differs from others because it accommodates regional construction styles and available data. The resulting generation amount per capita is less than the US estimate - attributable to the high construction, low demolition activity seen in Florida.

  1. An Estimation of Construction and Demolition Debris in Seoul, Korea: Waste Amount, Type, and Estimating Model.

    PubMed

    Seo, Seongwon; Hwang, Yongwoo

    1999-08-01

    Construction and demolition (C&D) debris is generated at the site of various construction activities. However, the amount of the debris is usually so large that it is necessary to estimate the amount of C&D debris as accurately as possible for effective waste management and control in urban areas. In this paper, an effective estimation method using a statistical model was proposed. The estimation process was composed of five steps: estimation of the life span of buildings; estimation of the floor area of buildings to be constructed and demolished; calculation of individual intensity units of C&D debris; and estimation of the future C&D debris production. This method was also applied in the city of Seoul as an actual case, and the estimated amount of C&D debris in Seoul in 2021 was approximately 24 million tons. Of this total amount, 98% was generated by demolition, and the main components of debris were concrete and brick.

  2. Effects of anthropogenic particles on the chemical and geophysical properties of urban soils, Detroit, Michigan

    NASA Astrophysics Data System (ADS)

    Orlicki, Katharine M.

    There is a great need in many cities for a better quality of urban soil maps. This is due to the increasing interest in repurposing vacant land for urban redevelopment, agriculture, and green infrastructure. Mapping vacant urban land in Detroit can be very difficult because anthropogenic soils were often highly variable and frequently contained demolition debris (such as brick), making it difficult to use a hand auger. This study was undertaken in Detroit, MI to create a more efficient way to map urban soils based on their geophysical and chemical properties. This will make the mapping process faster, less labor intensive, and therefore more cost effective. Optical and chemical criteria for the identification and classification of microartifacts (MAs) were made from a set of reference artifacts of a known origin. These MAs were then observed and tested in urban topsoil samples from sites in Detroit, Michigan that represent three different land use types (residential demolition, fly ash-impacted, and industrial). Optical analyses, SEM, EDAX, and XRD showed that reference MAs may be classified into five basic compositional types (carbonaceous, calcareous, siliceous, ferruginous and miscellaneous). Reference MAs were generally distinguishable using optical microscopy by color, luster, fracture and microtexture. MAs that were more difficult to classify were further differentiable when using SEM, EDAX, and XRD. MAs were found in all of the anthropogenic soils studied, but were highly variable. All three study sites had concentrations coal-related wastes were the most common types of MAs observed and often included coal, ash (microspheres, microagglomerate), cinders, and burnt shale. MAs derived from waste building materials such as brick, mortar, and glass, were typically found on residential demolition sites. Manufacturing waste MAs, which included iron-making slag and coked coal were commonly observed on industrial sites. Fly ash-impacted sites were composed of only microspheres and microagglomerate that were concentrated within the soils by airborne deposition, making it widespread. These results support the hypothesis that MA assemblages of distinct composition vary with land use. Therefore, it seems likely that magnetic susceptibility surveying and other geophysical methods will prove effective for mapping anthropogenic soils on vacant urban land. Anthropogenic soils and MAs were assessed for pH, electrical conductivity (EC), and magnetic susceptibility (MS). The A horizons of urban soils at residential demolition, industrial-impacted, and fly ash-impacted sites were found to be distinguishable from those of native soils. Anthropogenic soils were higher by one pH unit or more than the background level, had an EC value two to three times the background level, and had MS measurements up to 20 times greater than the background level. The analysis of reference artifacts suggested that the elevated pH of anthropogenic soils was caused by calcareous building material wastes, the elevated EC were the result of both calcareous and ferruginous wastes, and elevated MS were attributable to ferromagnetic materials. Anthropogenic soils collected at residential demolition sites were differentiable by EC, whereas those at collected form industrial sites were distinguishable using MS. Therefore, anthropogenic soils and native soils have a unique chemical and geophysical signature which can be highly dependent on the concentration of MAs. This suggests that EC and MS surveying methods may be used to remotely sense and map urban soils more effectively than using traditional methods alone.

  3. Mechanical Demolition of Buildings with Concrete Asbestos Board Siding: Methodology, Precautions, and Results at the Hanford Central Plateau - 12417

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kehler, Kurt

    Since the start of its contract in 2008, the CH2M Hill Plateau Remediation Company (CH2M HILL) has demolished 25 buildings with concrete asbestos board (CAB) siding using mechanical means. While the asbestos contained in CAB siding is not friable in its manufactured form, concerns persist that mechanical methods of demolition have the potential to render the asbestos friable and airborne, therefore posing a health risk to demolition workers and the public. CH2M HILL's experience demonstrates that when carefully managed, mechanical demolition of CAB siding can be undertaken safely, successfully, and in compliance with regulatory requirements for the disposal of Classmore » II Asbestos-Containing Material (ACM). While the number of buildings demolished at Hanford and the number of samples collected does not make a conclusive argument that CAB cannot be made friable with normal demolition techniques, it certainly provides a significant body of evidence for the success of the approach. Of course, there are many factors that affect how to demolish a structure and dispose of the waste. These factors will impact the success depending on each site. The most obvious factors which contribute to this success at Hanford are: 1. The availability of onsite waste disposal where the handling and cost of asbestos-containing waste is not much different than other potentially contaminated waste. Therefore, segregation of demolition debris from the potential asbestos contamination is not necessary from a debris handling or asbestos disposal aspect. 2. The space between structures is typically significant enough to allow for large exclusion zones. There are not many restrictions due to cohabitation issues or potential contamination of adjacent facilities. 3. The willingness of the regulators and client to understand the industrial safety issues associated with manual CAB removal. (authors)« less

  4. Forecasting of construction and demolition waste in Brazil.

    PubMed

    Paz, Diogo Hf; Lafayette, Kalinny Pv

    2016-08-01

    The objective of this article is to develop a computerised tool (software) that facilitates the analysis of strategies for waste management on construction sites through the use of indicators of construction and demolition waste generation. The development involved the following steps: knowledge acquisition, structuring the system, coding and system evaluation. The step of knowledge acquisition aims to provide subsidies for the representation of them through models. In the step of structuring the system, it was presented the structuring and formalisation of knowledge for the development of the system, and has two stages: the construction of the conceptual model and the subsequent instantiation of the model. The coding system aims to implement (code) the conceptual model developed in a model played by computer (digital). The results showed that the system is very useful and applicable in construction sites, helping to improve the quality of waste management, and creating a database that will support new research. © The Author(s) 2016.

  5. Mitigation of Hexavalent Chromium in Storm Water Resulting from Demolition of Large Concrete Structure at the East Tennessee Technology Park - 12286

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Britto, Ronnie; Brown, Bridget; Hale, Timothy B.

    American Recovery and Reinvestment Act (ARRA) funding was provided to supplement the environmental management program at several DOE sites, including the East Tennessee Technology Park (ETTP) in Oak Ridge, Tennessee. Demolition of the ETTP K-33 Building, the largest building to be demolished to date in Oak Ridge, was awarded to LSRS in FY-2010 under the ARRA program. The K-33 building was an 82 foot tall 2-story structure covering approximately 32 acres. Once this massive building was brought down to the ground, the debris was segregated and consolidated into piles of concrete rubble and steel across the remaining pad. The processmore » of demolishing the building, tracking across concrete debris with heavy equipment, and stockpiling the concrete rubble caused it to become pulverized. During and after storm events, hexavalent chromium leached from the residual cement present in the large quantities of concrete. Storm water control measures were present to preclude migration of contaminants off-site, but these control measures were not designed to control hexavalent chromium dissolved in storm water from reaching nearby receiving water. The following was implemented to mitigate hexavalent chromium in storm water: - Steel wool was distributed around K-33 site catch basins and in water pools as an initial step in addressing hexavalent chromium. - Since the piles of concrete were too massive and unsafe to tarp, they were placed into windrows in an effort to reduce total surface area. - A Hach colorimetric field meter was acquired by the K-33 project to provide realtime results of hexavalent chromium in site surface water. - Three hexavalent chromium treatment systems were installed at three separate catch basins that receive integrated storm water flow from the K-33 site. Sodium bisulfite is being used as a reducing agent for the immobilization of hexavalent chromium while also assisting in lowering pH. Concentrations initially were 310 - 474 ppb of hexavalent chromium in surface water at the out-falls that discharge to nearby receiving water. After implementation of the actions described above, concentrations of hexavalent chromium have been effectively reduced to less than 25 ppb at the out-falls. The LSRS team completed demolition of K-33 five months ahead of schedule, and debris removal was completed three months ahead of schedule. A total of 164,000 tons of steel and concrete from the building demolition, accounting for 13,000 shipments, were disposed to the EMWMF. Because of the high toxicity of hexavalent chromium at low concentrations, hexavalent chromium had to be controlled at ppb levels. Hexavalent chromium contaminant concentrations were successfully reduced by over 90% in surface water discharged from the K-33 demolition site into nearby receiving water. Initial efforts of wind-rowing debris piles and obtaining real-time hexavalent chromium measurements to focus initiatives coupled with placement of steel wool in pools or catch basins had some effectiveness. More significant reductions were obtained as the debris piles were removed/disposed in EMWMF, and treatment of surface water with sodium bisulfite in integrated manholes occurred. (authors)« less

  6. Single-site neural tube closure in human embryos revisited.

    PubMed

    de Bakker, Bernadette S; Driessen, Stan; Boukens, Bastiaan J D; van den Hoff, Maurice J B; Oostra, Roelof-Jan

    2017-10-01

    Since the multi-site closure theory was first proposed in 1991 as explanation for the preferential localizations of neural tube defects, the closure of the neural tube has been debated. Although the multi-site closure theory is much cited in clinical literature, single-site closure is most apparent in literature concerning embryology. Inspired by Victor Hamburgers (1900-2001) statement that "our real teacher has been and still is the embryo, who is, incidentally, the only teacher who is always right", we decided to critically review both theories of neural tube closure. To verify the theories of closure, we studied serial histological sections of 10 mouse embryos between 8.5 and 9.5 days of gestation and 18 human embryos of the Carnegie collection between Carnegie stage 9 (19-21 days) and 13 (28-32 days). Neural tube closure was histologically defined by the neuroepithelial remodeling of the two adjoining neural fold tips in the midline. We did not observe multiple fusion sites in neither mouse nor human embryos. A meta-analysis of case reports on neural tube defects showed that defects can occur at any level of the neural axis. Our data indicate that the human neural tube fuses at a single site and, therefore, we propose to reinstate the single-site closure theory for neural tube closure. We showed that neural tube defects are not restricted to a specific location, thereby refuting the reasoning underlying the multi-site closure theory. Clin. Anat. 30:988-999, 2017. © 2017 Wiley Periodicals, Inc. © 2017 Wiley Periodicals, Inc.

  7. Closure Plan for the Area 5 Radioactive Waste Management Site at the Nevada Test Site

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NSTec Environmental Management

    The Area 5 Radioactive Waste Management Site (RMWS) at the Nevada Test Site (NTS) is managed and operated by National Security Technologies, LLC (NSTec), for the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office (NNSA/NSO). This document is the first update of the preliminary closure plan for the Area 5 RWMS at the NTS that was presented in the Integrated Closure and Monitoring Plan (DOE, 2005a). The major updates to the plan include a new closure schedule, updated closure inventory, updated site and facility characterization data, the Title II engineering cover design, and the closure processmore » for the 92-Acre Area of the RWMS. The format and content of this site-specific plan follows the Format and Content Guide for U.S. Department of Energy Low-Level Waste Disposal Facility Closure Plans (DOE, 1999a). This interim closure plan meets closure and post-closure monitoring requirements of the order DOE O 435.1, manual DOE M 435.1-1, Title 40 Code of Federal Regulations (CFR) Part 191, 40 CFR 265, Nevada Administrative Code (NAC) 444.743, and Resource Conservation and Recovery Act (RCRA) requirements as incorporated into NAC 444.8632. The Area 5 RWMS accepts primarily packaged low-level waste (LLW), low-level mixed waste (LLMW), and asbestiform low-level waste (ALLW) for disposal in excavated disposal cells.« less

  8. Occupational exposure to dioxins by thermal oxygen cutting, welding, and soldering of metals.

    PubMed Central

    Menzel, H M; Bolm-Audorff, U; Turcer, E; Bienfait, H G; Albracht, G; Walter, D; Emmel, C; Knecht, U; Päpke, O

    1998-01-01

    This paper focuses on one aspect of occupational dioxin exposure that is novel and unexpected. Exposures in excess of the German threshold limit value of 50 pg international toxicity equivalent (I-TEQ)/m3 are very frequent, unpredictable, and sometimes very high--up to 6612 pg I-TEQ/m3--during thermal oxygen cutting at scrap metal and demolition sites. The same procedure involving virgin steel in steel trade and mass production of steel objects gave no such evidence, even though no final conclusions can be drawn because of the low number of samples analyzed. Low dioxin exposures during inert gas electric arc welding confirm previous literature findings, whereas soldering and thermal oxygen cutting in the presence of polyvinyl chloride give rise to concern. The consequences of occupational dioxin exposure were studied by analysis of the dioxin-blood concentration, the body burden, of men performing thermal oxygen cutting at scrap metal reclamation and demolition sites, in steel trade and producing plants as well as for industrial welders and white-collar workers. The results concerning body burdens are in excellent agreement with the dioxin exposure as characterized by dioxin air concentration in the workplace. The significant positive correlation between duration and frequency of performing thermal oxygen cutting at metal reclamation and demolition sites expressed in job-years and dioxin body burden speaks for the occupational origin of the observed overload after long times. The results reported here lead to consequences for occupational health, which are discussed and require immediate attention. Images Figure 1 PMID:9599722

  9. 24 CFR 970.27 - De minimis exception to demolition requirements.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 24 Housing and Urban Development 4 2010-04-01 2010-04-01 false De minimis exception to demolition... De minimis exception to demolition requirements. (a) A PHA may demolish units without submitting an... proposed de minimis demolition, except that any demolition performed prior to October 21, 1998, will not be...

  10. 24 CFR 970.27 - De minimis exception to demolition requirements.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 24 Housing and Urban Development 4 2011-04-01 2011-04-01 false De minimis exception to demolition... De minimis exception to demolition requirements. (a) A PHA may demolish units without submitting an... proposed de minimis demolition, except that any demolition performed prior to October 21, 1998, will not be...

  11. Progress in Decommissioning the Humboldt Bay Power Plant - 13604

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Rod, Kerry; Shelanskey, Steven K.; Kristofzski, John

    Decommissioning of the Pacific Gas and Electric (PG and E) Company Humboldt Bay Power Plant (HBPP) Unit 3 nuclear facility has now, after more than three decades of SAFSTOR and initial decommissioning work, transitioned to full-scale decommissioning. Decommissioning activities to date have been well orchestrated and executed in spite of an extremely small work site with space constricted even more by other concurrent on-site major construction projects including the demolition of four fossil units, construction of a new generating station and 60 KV switchyard upgrade. Full-scale decommissioning activities - now transitioning from Plant Systems Removal (PG and E self-perform) tomore » Civil Works Projects (contractor performed) - are proceeding in a safe, timely, and cost effective manner. As a result of the successful decommissioning work to date (approximately fifty percent completed) and the intense planning and preparations for the remaining work, there is a high level of confidence for completion of all HBPP Unit 3 decommissions activities in 2018. Strategic planning and preparations to transition into full-scale decommissioning was carried out in 2008 by a small, highly focused project team. This planning was conducted concurrent with other critical planning requirements such as the loading of spent nuclear fuel into dry storage at the Independent Spent Fuel Storage Installation (ISFSI) finishing December 2008. Over the past four years, 2009 through 2012, the majority of decommissioning work has been installation of site infrastructure and removal of systems and components, known as the Plant System Removal Phase, where work scope was dynamic with significant uncertainty, and it was self-performed by PG and E. As HBPP Decommissioning transitions from the Plant System Removal Phase to the Civil Works Projects Phase, where work scope is well defined, a contracting plan similar to that used for Fossil Decommissioning will be implemented. Award of five major work scopes in various stages of development are planned as they include: Turbine Building Demolition, Nuclear Facilities Demolition and Excavation, Intake and Discharge Canal Remediation, Office Facility Demobilization, and Final Site Restoration. Benefits realized by transitioning to the Civil Works Projects Phase with predominant firm fixed-price/fixed unit price contracting include single civil works contractor who can coordinate concrete shaving, liner removal, structural removal, and other demolition activities; streamline financial control; reduce PG and E overhead staffing; and provide a specialized Bidder Team with experience from other similar projects. (authors)« less

  12. Closure report for Corrective Action Unit 211, Area 15 EPA Farm waste sites, Nevada Test Site, Nevada

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1998-04-01

    This Closure Report summarizes the corrective actions which were completed at the Corrective Action Sites within Corrective Action Unit 211 Area 15 Farm Waste Sties at the Nevada Test Site. Current site descriptions, observations and identification of wastes removed are included on FFACO Corrective Action Site housekeeping closure verification forms.

  13. Positive Catch & Economic Benefits of Periodic Octopus Fishery Closures: Do Effective, Narrowly Targeted Actions ‘Catalyze’ Broader Management?

    PubMed Central

    Oliver, Thomas A.; Oleson, Kirsten L. L.; Ratsimbazafy, Hajanaina; Raberinary, Daniel; Benbow, Sophie; Harris, Alasdair

    2015-01-01

    Overview Eight years of octopus fishery records from southwest Madagascar reveal significant positive impacts from 36 periodic closures on: (a) fishery catches and (b) village fishery income, such that (c) economic benefits from increased landings outweigh costs of foregone catch. Closures covered ~20% of a village’s fished area and lasted 2-7 months. Fishery Catches from Each Closed Site Octopus landings and catch per unit effort (CPUE) significantly increased in the 30 days following a closure’s reopening, relative to the 30 days before a closure (landings: +718%, p<0.0001; CPUE: +87%, p<0.0001; n = 36). Open-access control sites showed no before/after change when they occurred independently of other management (“no ban”, n = 17/36). On the other hand, open-access control sites showed modest catch increases when they extended a 6-week seasonal fishery shutdown (“ban”, n = 19/36). The seasonal fishery shutdown affects the entire region, so confound all potential control sites. Fishery Income in Implementing Villages In villages implementing a closure, octopus fishery income doubled in the 30 days after a closure, relative to 30 days before (+132%, p<0.001, n = 28). Control villages not implementing a closure showed no increase in income after “no ban” closures and modest increases after “ban” closures. Villages did not show a significant decline in income during closure events. Net Economic Benefits from Each Closed Site Landings in closure sites generated more revenue than simulated landings assuming continued open-access fishing at that site (27/36 show positive net earnings; mean +$305/closure; mean +57.7% monthly). Benefits accrued faster than local fishers’ time preferences during 17-27 of the 36 closures. High reported rates of illegal fishing during closures correlated with poor economic performance. Broader Co-Management We discuss the implications of our findings for broader co-management arrangements, particularly for catalyzing more comprehensive management. PMID:26083862

  14. Demolition of a hospital building by controlled explosion: the impact on filamentous fungal load in internal and external air.

    PubMed

    Bouza, E; Peláez, T; Pérez-Molina, J; Marín, M; Alcalá, L; Padilla, B; Muñoz, P; Adán, P; Bové, B; Bueno, M J; Grande, F; Puente, D; Rodríguez, M P; Rodríguez-Créixems, M; Vigil, D; Cuevas, O

    2002-12-01

    The demolition of a maternity building at our institution provided us with the opportunity to study the load of filamentous fungi in the air. External (nearby streets) and internal (within the hospital buildings) air was sampled with an automatic volumetric machine (MAS-100 Air Samplair) at least daily during the week before the demolition, at 10, 30, 60, 90,120, 180, 240, 420, 540 and 660 min post-demolition, daily during the week after the demolition and weekly during weeks 2, 3 and 4 after demolition. Samples were duplicated to analyse reproducibility. Three hundred and forty samples were obtained: 115 external air, 69 'non-protected' internal air and 156 protected internal air [high efficiency particulate air (HEPA) filtered air under positive pressure]. A significant increase in the colony count of filamentous fungi occurred after the demolition. Median colony counts of external air on demolition day were significantly higher than from internal air (70.2 cfu/m(3) vs 35.8 cfu/m(3)) (P < 0.001). Mechanical demolition on day +4 also produced a significant difference between external and internal air (74.5 cfu/m(3) vs 41.7 cfu/m(3)). The counts returned to baseline levels on day +11. Most areas with a protected air supply yielded no colonies before demolition day and remained negative on demolition day. The reproducibility of the count method was good (intra-assay variance: 2.4 cfu/m(3)). No episodes of invasive filamentous mycosis were detected during the three months following the demolition. Demolition work was associated with a significant increase in the fungal colony counts of hospital external and non-protected internal air. Effective protective measures may be taken to avoid the emergence of clinical infections. Copyright 2002 The Hospital Infection Society

  15. Estimation of construction and demolition waste using waste generation rates in Chennai, India.

    PubMed

    Ram, V G; Kalidindi, Satyanarayana N

    2017-06-01

    A large amount of construction and demolition waste is being generated owing to rapid urbanisation in Indian cities. A reliable estimate of construction and demolition waste generation is essential to create awareness about this stream of solid waste among the government bodies in India. However, the required data to estimate construction and demolition waste generation in India are unavailable or not explicitly documented. This study proposed an approach to estimate construction and demolition waste generation using waste generation rates and demonstrated it by estimating construction and demolition waste generation in Chennai city. The demolition waste generation rates of primary materials were determined through regression analysis using waste generation data from 45 case studies. Materials, such as wood, electrical wires, doors, windows and reinforcement steel, were found to be salvaged and sold on the secondary market. Concrete and masonry debris were dumped in either landfills or unauthorised places. The total quantity of construction and demolition debris generated in Chennai city in 2013 was estimated to be 1.14 million tonnes. The proportion of masonry debris was found to be 76% of the total quantity of demolition debris. Construction and demolition debris forms about 36% of the total solid waste generated in Chennai city. A gross underestimation of construction and demolition waste generation in some earlier studies in India has also been shown. The methodology proposed could be utilised by government bodies, policymakers and researchers to generate reliable estimates of construction and demolition waste in other developing countries facing similar challenges of limited data availability.

  16. Positive Catch & Economic Benefits of Periodic Octopus Fishery Closures: Do Effective, Narrowly Targeted Actions 'Catalyze' Broader Management?

    PubMed

    Oliver, Thomas A; Oleson, Kirsten L L; Ratsimbazafy, Hajanaina; Raberinary, Daniel; Benbow, Sophie; Harris, Alasdair

    2015-01-01

    Eight years of octopus fishery records from southwest Madagascar reveal significant positive impacts from 36 periodic closures on: (a) fishery catches and (b) village fishery income, such that (c) economic benefits from increased landings outweigh costs of foregone catch. Closures covered ~20% of a village's fished area and lasted 2-7 months. Octopus landings and catch per unit effort (CPUE) significantly increased in the 30 days following a closure's reopening, relative to the 30 days before a closure (landings: +718%, p<0.0001; CPUE: +87%, p<0.0001; n = 36). Open-access control sites showed no before/after change when they occurred independently of other management ("no ban", n = 17/36). On the other hand, open-access control sites showed modest catch increases when they extended a 6-week seasonal fishery shutdown ("ban", n = 19/36). The seasonal fishery shutdown affects the entire region, so confound all potential control sites. In villages implementing a closure, octopus fishery income doubled in the 30 days after a closure, relative to 30 days before (+132%, p<0.001, n = 28). Control villages not implementing a closure showed no increase in income after "no ban" closures and modest increases after "ban" closures. Villages did not show a significant decline in income during closure events. Landings in closure sites generated more revenue than simulated landings assuming continued open-access fishing at that site (27/36 show positive net earnings; mean +$305/closure; mean +57.7% monthly). Benefits accrued faster than local fishers' time preferences during 17-27 of the 36 closures. High reported rates of illegal fishing during closures correlated with poor economic performance. We discuss the implications of our findings for broader co-management arrangements, particularly for catalyzing more comprehensive management.

  17. 29 CFR 1926.859 - Mechanical demolition.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 29 Labor 8 2010-07-01 2010-07-01 false Mechanical demolition. 1926.859 Section 1926.859 Labor Regulations Relating to Labor (Continued) OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR (CONTINUED) SAFETY AND HEALTH REGULATIONS FOR CONSTRUCTION Demolition § 1926.859 Mechanical demolition. (a...

  18. Pursestring closure of the stoma site leads to fewer wound infections: results from a multicenter randomized controlled trial.

    PubMed

    Lee, Janet T; Marquez, Thao T; Clerc, Daniel; Gie, Olivier; Demartines, Nicolas; Madoff, Robert D; Rothenberger, David A; Christoforidis, Dimitrios

    2014-11-01

    Surgical site infection after stoma reversal is common. The optimal skin closure technique after stoma reversal has been widely debated in the literature. We hypothesized that pursestring near-complete closure of the stoma site would lead to fewer surgical site infections compared with conventional primary closure. This study was a parallel prospective multicenter randomized controlled trial. This study was conducted at 2 university medical centers. Patients (N = 122) presenting for elective colostomy or ileostomy reversal were selected. Pursestring versus conventional primary closure of stoma sites were compared. Stoma site surgical site infection within 30 days of surgery, overall surgical site infection, delayed healing (open wound for >30 days), time to wound epithelialization, and patient satisfaction were the primary outcomes measured. The pursestring group had a significantly lower stoma site infection rate (2% vs 15%, p = 0.01). There was no difference in delayed healing or patient satisfaction between groups. Time to epithelialization was measured in only 51 patients but was significantly longer in the pursestring group (34.6 ± 20 days vs 24.1 ± 17 days, p = 0.02). This study was limited by the variability in procedures and surgeons, the limited follow-up after 30 days, and the inability to perform blinding. Pursestring closure after stoma reversal has a lower risk of stoma site surgical site infection than conventional primary closure, although wounds may take longer to heal with the use of this approach. NCT01713452 (www.clinicaltrials.gov).

  19. Post-Closure Monitoring Report for Corrective Action Unit 339: Area 12 Fleet Operations Steam Cleaning Effluent Nevada Test Site, Nevada

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    K. B. Campbell

    2002-09-01

    The Area 12 Fleet Operations Steam Cleaning Effluent site is located in the southeastern portion of the Area 12 Camp at the Nevada Test Site. This site is identified in the Federal Facility Agreement and Consent Order (1996) as Corrective Action Site (CAS) 12-19-01 and is the only CAS assigned to Corrective Action Unit (CAU) 339. Post-closure sampling and inspection of the site were completed on March 27, 2002. Post-closure monitoring activities were scheduled biennially (every two years) in the Post-Closure Monitoring Plan provided in the Closure Report for CAU 339: Area 12 Fleet Operations Steam Cleaning Effluent, Nevada Testmore » Site (U.S. Department of Energy, Nevada Operations Office [DOEN], 1997). A baseline for the site was established by sampling in 1997. Based on the recommendations from the 1999 post-closure monitoring report (DOE/NV, 1999), samples were collected in 2000, earlier than originally proposed, because the 1999 sample results did not provide the expected decrease in total petroleum hydrocarbon (TPH) concentrations at the site. Sampling results from 2000 (DOE/NV, 2000) and 2001 (DOE/NV, 2001) revealed favorable conditions for natural degradation at the CAU 339 site, but because of differing sample methods and heterogeneity of the soil, data results from 2000 and later were not directly correlated with previous results. Post-closure monitoring activities for 2002 consisted of the following: (1) Soil sample collection from three undisturbed plots (Plots A, B, and C, Figure 2). (2) Sample analysis for TPH as oil and bio-characterization parameters (Comparative Enumeration Assay [CEA] and Standard Nutrient Panel [SNP]). (3) Site inspection to evaluate the condition of the fencing and signs. (4) Preparation and submittal of the Post-Closure Monitoring Report.« less

  20. Closure Report for Corrective Action Unit 139: Waste Disposal Sites, Nevada Test Site, Nevada

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NSTec Environmental Restoration

    2009-07-31

    Corrective Action Unit (CAU) 139 is identified in the Federal Facility Agreement and Consent Order (FFACO) as 'Waste Disposal Sites' and consists of the following seven Corrective Action Sites (CASs), located in Areas 3, 4, 6, and 9 of the Nevada Test Site: CAS 03-35-01, Burn Pit; CAS 04-08-02, Waste Disposal Site; CAS 04-99-01, Contaminated Surface Debris; CAS 06-19-02, Waste Disposal Site/Burn Pit; CAS 06-19-03, Waste Disposal Trenches; CAS 09-23-01, Area 9 Gravel Gertie; and CAS 09-34-01, Underground Detection Station. Closure activities were conducted from December 2008 to April 2009 according to the FFACO (1996, as amended February 2008) andmore » the Corrective Action Plan for CAU 139 (U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office, 2007b). The corrective action alternatives included No Further Action, Clean Closure, and Closure in Place with Administrative Controls. Closure activities are summarized. CAU 139, 'Waste Disposal Sites,' consists of seven CASs in Areas 3, 4, 6, and 9 of the NTS. The closure alternatives included No Further Action, Clean Closure, and Closure in Place with Administrative Controls. This CR provides a summary of completed closure activities, documentation of waste disposal, and confirmation that remediation goals were met. The following site closure activities were performed at CAU 139 as documented in this CR: (1) At CAS 03-35-01, Burn Pit, soil and debris were removed and disposed as LLW, and debris was removed and disposed as sanitary waste. (2) At CAS 04-08-02, Waste Disposal Site, an administrative UR was implemented. No postings or post-closure monitoring are required. (3) At CAS 04-99-01, Contaminated Surface Debris, soil and debris were removed and disposed as LLW, and debris was removed and disposed as sanitary waste. (4) At CAS 06-19-02, Waste Disposal Site/Burn Pit, no work was performed. (5) At CAS 06-19-03, Waste Disposal Trenches, a native soil cover was installed, and a UR was implemented. (6) At CAS 09-23-01, Area 9 Gravel Gertie, a UR was implemented. (7) At CAS 09-34-01, Underground Detection Station, no work was performed.« less

  1. Application of life-cycle assessment (LCA) methodology for valorization of building demolition materials and products

    NASA Astrophysics Data System (ADS)

    Sara, Balazs; Antonini, Ernesto; Tarantini, Mario

    2001-02-01

    The VAMP project (VAlorization of building demolition Materials and Products, LIFE 98/ENV/IT/33) aims to build an effective and innovative information system to support decision making in selective demolition activity and to manage the valorization (recovery-reuse-recycling) of waste flows produced by the construction and demolition (C&D) sector. The VAMP information system will be tested it in Italy in some case studies of selective demolition. In this paper the proposed demolition-valorization system will be compared to the traditional one in a life cycle perspective, applying LCA methodology to highlight the advantages of VAMP system from an eco-sustainability point of view. Within the system boundaries demolition processes, transport of demolition wastes and its recovery/treatment or disposal in landfill were included. Processes avoided due to reuse-recycling activities, such as extraction of natural resources and manufacture of building materials and components, were considered too. In this paper data collection procedure applied in inventory and impact assessment phases and a general overview about data availability for LCA studies in this sector are presented. Results of application of VAMP methodology to a case study are discussed and compared with a simulated traditional demolition of the same building. Environmental advantages of VAMP demolition-valorization system are demonstrated quantitatively emphasizing the special importance of reuse of building components with high demand of energy for manufacture.

  2. 100 Area D4 Project Building Completion Report - July 2007 to December 2008

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    M. T. Stankovich

    2009-04-15

    This report documents the decontamination, decommissioning, and demolition of the 105-NB, 163-N, 183-N, 183-NA, 183-NB, 183-NC, 184-N, 184-NA, 184-NB, 184-NC, 184-ND, 184-NE, 184-NF, 1312-N, 1330-N, 1705-N, 1705-NA, 1706-N, 1712-N, 1714-N, 1714-NA, 1714-NB, 1802-N, MO-050, MO-055, MO-358, MO-390, MO-900, MO-911, and MO-950 facilities in the 100 Area of the Hanford Site. The D4 activities for these facilities include utility disconnection, planning, characterization, engineering, removal of hazardous and radiological contaminated materials, equipment removal, decommissioning, deactivation, decontamination, demolition of the structure, and removal of the remaining slabs.

  3. 76 FR 35006 - Recovery Policy RP9523.4, Demolition of Private Structures

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-15

    ...] Recovery Policy RP9523.4, Demolition of Private Structures AGENCY: Federal Emergency Management Agency, DHS... (FEMA) is accepting comments on Recovery Policy RP9523.4, Demolition of Private Structures. DATES... guidance in determining the eligibility of demolition of private structures under the provisions of the...

  4. CLOSURE REPORT FOR CORRECTIVE ACTION UNIT 528: POLYCHLORINATED BIPHENYLS CONTAMINATION NEVADA TEST SITE, NEVADA

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    BECHTEL NEVADA

    2006-09-01

    This Closure Report (CR) describes the closure activities performed at CAU 528, Polychlorinated Biphenyls Contamination, as presented in the Nevada Division of Environmental Protection (NDEP)-approved Corrective Action Plan (CAP) (US. Department of Energy, National Nuclear Security Administration Nevada Site Office [NNSAINSO], 2005). The approved closure alternative was closure in place with administrative controls. This CR provides a summary of the completed closure activities, documentation of waste disposal, and analytical data to confirm that the remediation goals were met.

  5. 76 FR 32313 - Safety Zone; Chelsea St. Bridge Demolition, Chelsea River, Chelsea, MA

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-06

    ...-AA00 Safety Zone; Chelsea St. Bridge Demolition, Chelsea River, Chelsea, MA AGENCY: Coast Guard, DHS... Sector Boston Captain of the Port (COTP) Zone for the demolition of the Chelsea St. Bridge. This safety... Chelsea St. Bridge during the operations surrounding the bridge's demolition and removal. Discussion of...

  6. Remedial Action Report for Operable Units 6-05 and 10-04, Phase III

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    R. P. Wells

    2007-08-15

    This Phase III remedial action report addresses the remediation of lead-contaminated soils found at the Security Training Facility STF-02 Gun Range at the Idaho National Laboratory Site. Phase I, consisting of developing and implementing institutional controls at Operble Unit 10-04 sites and developing and implementing Idaho National Laboratory Site-wide plans for both institutional controls and ecological monitoring, was addressed in a previous report. Phase II will remediate sites contaminated with trinitrotoluene and Royal Demolition Explosive. Phase IV will remediate hazards from unexploded ordnance.

  7. 10 CFR 61.44 - Stability of the disposal site after closure.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 10 Energy 2 2013-01-01 2013-01-01 false Stability of the disposal site after closure. 61.44 Section 61.44 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSING REQUIREMENTS FOR LAND DISPOSAL OF RADIOACTIVE WASTE Performance Objectives § 61.44 Stability of the disposal site after closure. The disposal...

  8. 10 CFR 61.44 - Stability of the disposal site after closure.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 2 2011-01-01 2011-01-01 false Stability of the disposal site after closure. 61.44 Section 61.44 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSING REQUIREMENTS FOR LAND DISPOSAL OF RADIOACTIVE WASTE Performance Objectives § 61.44 Stability of the disposal site after closure. The disposal...

  9. 10 CFR 61.44 - Stability of the disposal site after closure.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 10 Energy 2 2014-01-01 2014-01-01 false Stability of the disposal site after closure. 61.44 Section 61.44 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSING REQUIREMENTS FOR LAND DISPOSAL OF RADIOACTIVE WASTE Performance Objectives § 61.44 Stability of the disposal site after closure. The disposal...

  10. 10 CFR 61.44 - Stability of the disposal site after closure.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 10 Energy 2 2012-01-01 2012-01-01 false Stability of the disposal site after closure. 61.44 Section 61.44 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSING REQUIREMENTS FOR LAND DISPOSAL OF RADIOACTIVE WASTE Performance Objectives § 61.44 Stability of the disposal site after closure. The disposal...

  11. 10 CFR 61.44 - Stability of the disposal site after closure.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 2 2010-01-01 2010-01-01 false Stability of the disposal site after closure. 61.44 Section 61.44 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSING REQUIREMENTS FOR LAND DISPOSAL OF RADIOACTIVE WASTE Performance Objectives § 61.44 Stability of the disposal site after closure. The disposal...

  12. Pharmaceuticals and Controlled Substances and Demolition

    EPA Pesticide Factsheets

    Pharmaceuticals and controlled substances found during residential demolition, such as prescription medications or illegal drugs, may require special treatment for disposal or recycling before demolition.

  13. Amchitka Mud Pit Sites 2006 Post-Closure Monitoring and Inspection Report, Amchitka Island, Alaska, Rev. No.: 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Matthews, Patrick

    2006-09-01

    In 2001, the U.S. Department of Energy (DOE), National Nuclear Security Administration (NNSA/NSO) remediated six areas associated with Amchitka mud pit release sites located on Amchitka Island, Alaska. This included the construction of seven closure caps. To ensure the integrity and effectiveness of remedial action, the mud pit sites are to be inspected every five years as part of DOE's long-term monitoring and surveillance program. In August of 2006, the closure caps were inspected in accordance with the ''Post-Closure Monitoring and Inspection Plan for Amchitka Island Mud Pit Release Sites'' (Rev. 0, November 2005). This post-closure monitoring report provides themore » 2006 cap inspection results.« less

  14. Post-Closure Strategy for Use-Restricted Sites on the Nevada National Security Site, Nevada Test and Training Range, and Tonopah Test Range, Nevada

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Silvas, A. J.

    The purpose of this Post-Closure Strategy is to provide a consistent methodology for continual evaluation of post-closure requirements for use-restricted areas on the Nevada National Security Site (NNSS), Nevada Test and Training Range (NTTR), and Tonopah Test Range (TTR) to consolidate, modify, or streamline the program. In addition, this document stipulates the creation of a single consolidated Post-Closure Plan that will detail the current post-closure requirements for all active use restrictions (URs) and outlines its implementation and subsequent revision. This strategy will ensure effective management and control of the post-closure sites. There are currently over 200 URs located on themore » NNSS, NTTR, and TTR. Post-closure requirements were initially established in the Closure Report for each site. In some cases, changes to the post-closure requirements have been implemented through addenda, errata sheets, records of technical change, or letters. Post-closure requirements have been collected from these multiple sources and consolidated into several formats, such as summaries and databases. This structure increases the possibility of inconsistencies and uncertainty. As more URs are established and the post-closure program is expanded, the need for a comprehensive approach for managing the program will increase. Not only should the current requirements be obtainable from a single source that supersedes all previous requirements, but the strategy for modifying the requirements should be standardized. This will enable more effective management of the program into the future. This strategy document and the subsequent comprehensive plan are to be implemented under the assumption that the NNSS and outlying sites will be under the purview of the U.S. Department of Energy, National Nuclear Security Administration for the foreseeable future. This strategy was also developed assuming that regulatory control of the sites remains static. The comprehensive plan is not intended to be a permanent long-term stewardship plan. However, it is intended to clarify requirements and identify components to effectively manage the sites until regulatory requirements are met or management of the site changes. The Environmental Management Program is required to manage these sites until the NNSS Environmental Restoration program is completed, currently planned for 2030. Prior to completion of the Environmental Restoration program, additional planning will be conducted to ensure that long-term stewardship of the sites is maintained. A comprehensive post-closure plan can be transitioned effectively into any future site-wide long-term stewardship program that may be developed. Therefore, the post-closure plan will include current aspects of the post-closure program that are also important aspects of long-term stewardship, including the following: • Management of physical and engineering controls such as fences, signs, and soil covers • Management of institutional and administrative controls such as use restrictions and real estate systems • Management of monitoring and maintenance programs • Management of information related to the sites such as geographic information system data and related documentation The strategy will also allow for periodic review and modification of any aspect of the program to ensure continued effectiveness.« less

  15. 26 CFR 1.280B-1 - Demolition of structures.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 26 Internal Revenue 3 2010-04-01 2010-04-01 false Demolition of structures. 1.280B-1 Section 1... (CONTINUED) INCOME TAXES Items Not Deductible § 1.280B-1 Demolition of structures. (a) In general. Section 280B provides that, in the case of the demolition of any structure, no deduction otherwise allowable...

  16. 77 FR 63732 - Safety Zone; Bridge Demolition Project; Indiana Harbor Canal, East Chicago, IN

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-17

    ...-AA00 Safety Zone; Bridge Demolition Project; Indiana Harbor Canal, East Chicago, IN AGENCY: Coast Guard... from a portion of the Indiana Harbor Canal due to the Demolition Project on the Cline Avenue Bridge... vessels from the hazards associated with the demolition project on the Cline Avenue bridge, which are...

  17. 75 FR 67216 - Regulated Navigation Area; Greenville Bridge Demolition, Lower Mississippi River Mile 531.3, AR, MS

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-02

    ... Regulated Navigation Area; Greenville Bridge Demolition, Lower Mississippi River Mile 531.3, AR, MS AGENCY... permitted to be in this area at certain times during the demolition of the Greenville Bridge, Lower... safety hazards during the demolition of the Greenville Bridge, Lower Mississippi River Mile 531.3. DATES...

  18. 77 FR 72957 - Safety Zone; Bridge Demolition Project; Indiana Harbor Canal, East Chicago, IN

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-07

    ...-AA00 Safety Zone; Bridge Demolition Project; Indiana Harbor Canal, East Chicago, IN AGENCY: Coast Guard... from a portion of the Indiana Harbor Canal due to the demolition Project on the Cline Avenue Bridge... associated with the demolition project on the Cline Avenue bridge, which are discussed further below. Under 5...

  19. TAN HOT SHOP AND SUPPORT FACILITY UTILIZATION STUDY

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Phillips, Ken Crawforth

    2001-11-01

    Impacts to the U.S. Department of Energy (DOE) complex caused by early closure (prior to 2018) and Demolition and Dismantlement (D&D) of the Test Area North (TAN) hot shop and its support facilities are explored in this report. Various possible conditions, such as Standby, Safe Store and Lay-up, that the facility may be placed in prior to eventually being turned over to D&D are addressed. The requirements, impacts, and implications to the facility and to the DOE Complex are discussed for each condition presented in the report. Some details of the report reference the Idaho National Engineering and Environmental Laboratorymore » (INEEL) Spent Nuclear Fuel Life Cycle Baseline Plan, the INEEL 2000 Infrastructure Long Range Plan, and other internal INEEL reports.« less

  20. TAN Hot Shop and Support Facility Utilization Study

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Picker, B.A.

    2001-11-16

    Impacts to the U.S. Department of Energy (DOE) complex caused by early closure (prior to 2018) and Demolition and Dismantlement (D and D) of the Test Area North (TAN) hot shop and its support facilities are explored in this report. Various possible conditions, such as Standby, Safe Store and Lay-up, that the facility may be placed in prior to eventually being turned over to D and D are addressed. The requirements, impacts, and implications to the facility and to the DOE Complex are discussed for each condition presented in the report. Some details of the report reference the Idaho Nationalmore » Engineering and Environmental Laboratory (INEEL) Spent Nuclear Fuel Life Cycle Baseline Plan, the INEEL 2000 Infrastructure Long Range Plan, and other internal INEEL reports.« less

  1. 77 FR 65818 - Safety Zone; Bridge Demolition Project; Indiana Harbor Canal, East Chicago, IN

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-31

    ...-AA00 Safety Zone; Bridge Demolition Project; Indiana Harbor Canal, East Chicago, IN AGENCY: Coast Guard... from a portion of the Indiana Harbor Canal due to the Demolition Project on the Cline Avenue Bridge... demolition project on the Cline Avenue Bridge, which are discussed further below. Under 5 U.S.C. 553(d)(3...

  2. Phased Demolition of an Occupied Facility

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Brede, Lawrence M.; Lauterbach, Merl J.; Witt, Brandon W.

    2008-01-15

    The U.S. government constructed the K-1401 facility in the late 1940's as a support building for various projects supporting the uranium gaseous diffusion process. In 2004 the U.S. Department of Energy authorized Bechtel Jacobs Company, LLC (BJC) to decontaminate and demolish the facility. The K-1401 facility was used for a variety of industrial purposes supporting the gaseous diffusion process. Many different substances were used to support these processes over the years and as a result different parts of the facility were contaminated with fluorine, chlorine trifluoride, uranium and technetium radiological contamination, asbestos, and mercury. The total facility area is 46,015more » m{sup 2} (495,000 sf) including a 6,800 m{sup 2} basement (73,200 sf). In addition to the contamination areas in the facility, a large portion was leased to businesses for re-industrialization when the D and D activities began. The work scope associated with the facility included purging and steam cleaning the former fluorine and chlorine trifluoride systems, decontaminating loose radiologically contaminated and mercury spill areas, dismantling former radiological lines contaminated with uranium oxide compounds and technetium, abating all asbestos containing material, and demolishing the facility. These various situations contributed to the challenge of successfully conducting D and D tasks on the facility. In order to efficiently utilize the work force, demolition equipment, and waste hauling trucks the normal approach of decontaminating the facility of the hazardous materials, and then conducting demolition in series required a project schedule of five years, which is not cost effective. The entire project was planned with continuous demolition as the goal end state. As a result, the first activities, Phase 1, required to prepare sections for demolition, including steam cleaning fluorine and chlorine trifluoride process lines in basement and facility asbestos abatement, were conducted while the tenants who were leasing floor space in the facility moved out. Upon completion of this phase the facility was turned over to the demolition project and the most hazardous materials were removed from the facility. Phase 2 activities included removing the process gas lines from sections C/D/E while decontaminating and preparing sections A and B for demolition. Demolition preparation activities include removing transit siding and universal waste from the area. Phase 3 began with demolition activities in sections A and B1 while continuing process gas line removal from sections C/D/E, as well as conducting demolition preparation activities to these sections. Area B was split into two sections, allowing demolition activities to occur in section B1 while personnel could still access the upper floor in sections C, D, and E. Once demolition began in section B2, personnel entry was only authorized in the basement. This timeline initiated phase 4, and the project completed cleaning the process components from the basement while section B2 demolition began. The final phase, phase 5, began once the basement was cleared. Final demolition activities began on sections C, D, E, and the basement. This material will ship for disposal and is scheduled for completion during FY07. Because the project was able to successfully phase demolition activities, the total facility demolition schedule was reduced by half to 2-1/2 years. The project was able to move portions of the demolition schedule from working in series to working in parallel, allowing the job to deliver facility demolition debris to ship for disposal 'just in time' as the facility was demolished.« less

  3. Chalk Line Mill, Anniston, AL

    EPA Pesticide Factsheets

    The Chalk Line Mill property was the site of a textile mill which operated from 1887 until 1994. Demolition activities in 2004 removed most of the structures on-site, but also left large, unsightly piles of debris scattered across this 14-acre property. The City applied for and received a $200,000 Brownfields cleanup grant in 2007 to address contamination on the property and the Appalachian Regional Commission provided an additional $150,000 in funding.

  4. Innovative hyperspectral imaging (HSI) based techniques applied to end-of-life concrete drill core characterization for optimal dismantling and materials recovery

    NASA Astrophysics Data System (ADS)

    Bonifazi, Giuseppe; Picone, Nicoletta; Serranti, Silvia

    2015-02-01

    The reduction of EOL concrete disposal in landfills, together with a lower exploitation of primary raw materials, generates a strong interest to develop, set-up and apply innovative technologies to maximize Construction and Demolition Waste (C&DW) conversion into useful secondary raw materials. Such a goal can be reached starting from a punctual in-situ efficient characterization of the objects to dismantle in order to develop demolition actions aimed to set up innovative mechanical-physical processes to recover the different materials and products to recycle. In this paper an innovative recycling-oriented characterization strategy based on HyperSpectral Imaging (HSI) is described in order to identify aggregates and mortar in drill core samples from end-of-life concrete. To reach this goal, concrete drill cores from a demolition site were systematically investigated by HSI in the short wave infrared field (1000-2500 nm). Results obtained by the adoption of the HSI approach showed as this technology can be successfully applied to analyze quality and characteristics of C&DW before dismantling and as final product to reutilise after demolition-milling-classification actions. The proposed technique and the related recognition logics, through the spectral signature detection of finite physical domains (i.e. concrete slice and/or particle) of different nature and composition, allows; i) to develop characterization procedures able to quantitatively assess end-of-life concrete compositional/textural characteristics and ii) to set up innovative sorting strategies to qualify the different materials constituting drill core samples.

  5. Lessons-Learned from D and D Activities at the Five Gaseous Diffusion Buildings (K-25, K- 27, K-29, K-31 and K-33) East Tennessee Technology Park, Oak Ridge, TN - 13574

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kopotic, James D.; Ferri, Mark S.; Buttram, Claude

    The East Tennessee Technology Park (ETTP) is the site of five former gaseous diffusion plant (GDP) process buildings that were used to enrich uranium from 1945 to 1985. The process equipment in the original two buildings (K-25 and K-27) was used for the production of highly enriched uranium (HEU), while that in the three later buildings (K-29, K-31 and K-33) produced low enriched uranium (LEU). Equipment was contaminated primarily with uranium and to a lesser extent technetium (Tc). Decommissioning of the GDP process buildings has presented several unique challenges and produced many lessons-learned. Among these is the importance of good,more » up-front characterization in developing the best demolition approach. Also, chemical cleaning of process gas equipment and piping (PGE) prior to shutdown should be considered to minimize the amount of hold-up material that must be removed by demolition crews. Another lesson learned is to maintain shutdown buildings in a dry state to minimize structural degradation which can significantly complicate characterization, deactivation and demolition efforts. Perhaps the most important lesson learned is that decommissioning GDP process buildings is first and foremost a waste logistics challenge. Innovative solutions are required to effectively manage the sheer volume of waste generated from decontamination and demolition (D and D) of these enormous facilities. Finally, close coordination with Security is mandatory to effectively manage Special Nuclear Material (SNM) and classified equipment issues. (authors)« less

  6. Design and implementation of an air monitoring program in support of a brownfields redevelopment program

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Maisel, B.E.; Hunt, G.T.; Devaney, R.J. Jr.

    EPA`s Brownfields Economic Redevelopment Initiative has sparked renewal of industrial and commercial parcels otherwise idled or under-utilized because of real or perceived environmental contamination. In certain cases, restoring such parcels to productive economic use requires a redevelopment effort protective of human health and welfare through minimizing offsite migration of environmental contaminants during cleanup, demolition and remediation activities. To support these objectives, an air monitoring program is often required as an integral element of a comprehensive brownfields redevelopment effort. This paper presents a strategic framework for design and execution of an ambient air monitoring program in support of a brownfields remediationmore » effort ongoing in Lawrence, MA. Based on site characterization, the program included sample collection and laboratory analysis of ambient air samples for polychlorinated biphenyls (PCBs), polychlorinated dibenzodioxins and polychlorinated dibenzofurans (PCDDs/PCDFs), total suspended particulate (TSP), inhalable particulate (PM10), and lead. The program included four monitoring phases, identified as background, wintertime, demolition/remediation and post-demolition. Air sampling occurred over a 16 month period during 1996--97, during which time nine sampling locations were utilized to produce approximately 1,500 ambient air samples. Following strict data review and validation procedures, ambient air data interpretation focused on the following: evaluation of upwind/downwind sample pairs, comparison of ambient levels to existing regulatory standards, relation of ambient levels to data reported in the open literature, and, determination of normal seasonal variations in existing background burden, comparison of ambient levels measured during site activity to background levels.« less

  7. A correlation analysis of percent canopy closure versus TMS spectral response for selected forest sites in the San Juan National Forest, Colorado

    NASA Technical Reports Server (NTRS)

    Butera, M. K.

    1983-01-01

    The correlation of canopy closure with the signal response of individual thematic mapper simulator (TMS) bands for selected forest sites in the San Juan National Forest, Colorado was investigated. Ground truth consisted of a photointerpreted determination of percent canopy closure of 0 to 100 percent for 32 sites. The sites selected were situated on plateaus at an elevation of approximately 3 km with slope or = 10 percent. The predominant tree species were ponderosa pine and aspen. The mean TMS response per band per site was calculated from data acquired by aircraft during mid-September, 1981. A correlation analysis of TMS response vs. canopy closure resulted in the following correlation coefficients for bands 1 through 7, respectively: -0.757, -0.663, -0.666, -0.088, -0.797, -0.763. Two model regressions were applied to the TMS data set to create a map of predicted percent forest canopy closure for the study area. Results indicated percent predictive accuracies of 71, 74, and 57 for percent canopy closure classes of 0-25, 25-75, and 75-100, respectively.

  8. Lead-Based Paint and Demolition

    EPA Pesticide Factsheets

    The Lead Renovation, Repair, and Painting Rule does not apply to total demolition of a structure. Learn about EPA recommended lead-safe practices during total demolition activities to prevent and minimize exposure to lead.

  9. Sustainable Management of Construction and Demolition Materials

    EPA Pesticide Factsheets

    This web page discusses how to sustainably manage construction and demolition materials, Information covers, what they are, and how builders, construction crews, demolition teams,and deign practitioners can divert C&D from landfills.

  10. Management of construction and demolition wastes as secondary building resources

    NASA Astrophysics Data System (ADS)

    Manukhina, Lyubov; Ivanova, Irina

    2017-10-01

    The article analyzes the methods of management of construction and demolition wastes. The authors developed suggestions for improving the management system of the turnover of construction and demolition wastes. Today the issue of improving the management of construction and demolition wastes is of the same importance as problems of protecting the life-support field from pollution and of preserving biological and land resources. The authors educed the prospective directions and methods for improving the management of the turnover processes for construction and demolition wastes, including the evaluation of potential of wastes as secondary raw materials and the formation of a centralized waste management system.

  11. [Clinical epidemiological study of neural tube defects classified according to the five sites of closure].

    PubMed

    Sanchis Calvo, A; Martínez- Frías, M

    2001-02-01

    To identify the frequency at birth of neural tube defects (NTD) in the Spanish population. NTDs were considered as a whole as well as according to the different sites of closure failure, following the theory of multisite closure of the neural tube. To analyze the epidemiological characteristics of the different sites. Data derived from the Spanish Collaborative Study of Congenital Malformations (ECEMC), from April 1976 to March 1995. Among the 1,222,698 live births during this period, 784 infants had NTD were controlled. Among these, 784 infants had NTD. The prevalence of NTD in our population was 1.01 per 1,000 births, a frequency which is considered medium-to low. Only 5.74% of the NTD were of known etiology: 2.17% were genic, 1.27% were chromosomic and 2.29% were environmental. Excluding NTD of genetic etiology, whether genic or chromosomic, most of the remaining were isolated defects (multifactorial) and 16.78% multiple malformations. Site 1, where the closure of the neural tube starts, represented 24% of all the affected sites. However, more than 50% of the NTDs corresponded to closure failure at the junction of two sites. As in other populations with a low prevalence of NTD at birth, the prevalence of these defects in our population showed a trend to decrease with time, due to the possibility of interrupting gestation after prenatal diagnosis. All the NTD could be classified according to the theory of multisite closure of the neural tube, including 13 cases with several noncontiguous affected sites. Two types of NTD were observed: in the first, closure failed to occur and in the second, two closures failed to meet.

  12. Social Mitigation of the Impact of Urban Renewal on Residents' Morale

    ERIC Educational Resources Information Center

    Cheung, Chau-kiu; Leung, Kwan-kwok

    2012-01-01

    Residents in the site of urban renewal suffer from its disturbance particularly during its demolition phase. One possible way of mitigating the suffering is assistance from kin and neighbors. The possibility rests on need fulfillment theory, which posits that needed assistance is salutary. To examine this possibility, the study surveyed 437…

  13. 76 FR 18066 - National Oil and Hazardous Substances Pollution Contingency Plan; National Priorities List...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-01

    ...-site) 518 tons of contaminated soil. During the removal, water samples taken from the storm drain... demolition phase took place immediately prior to and in connection with the relocation of soil and sediment... informing the public that the deletion will not take effect. ADDRESSES: Submit your comments, identified by...

  14. 43 CFR 423.14 - How will Reclamation post and delineate closed areas at the site of the closure?

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... closed areas at the site of the closure? 423.14 Section 423.14 Public Lands: Interior Regulations... RECLAMATION FACILITIES, LANDS, AND WATERBODIES Areas Open and Closed to Public Use § 423.14 How will Reclamation post and delineate closed areas at the site of the closure? Before or at the time of closing all...

  15. Closure Report for Corrective Action Unit 536: Area 3 Release Site, Nevada Test Site, Nevada

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NSTec Environmental Restoration

    Corrective Action Unit (CAU) 536 is located in Area 3 of the Nevada Test Site. CAU 536 is listed in the Federal Facility Agreement and Consent Order of 1996 as Area 3 Release Site, and comprises a single Corrective Action Site (CAS): {sm_bullet} CAS 03-44-02, Steam Jenny Discharge The Nevada Division of Environmental Protection (NDEP)-approved corrective action alternative for CAS 03-44-02 is clean closure. Closure activities included removing and disposing of total petroleum hydrocarbon (TPH)- and polyaromatic hydrocarbon (PAH)-impacted soil, soil impacted with plutonium (Pu)-239, and concrete pad debris. CAU 536 was closed in accordance with the NDEP-approved CAU 536more » Corrective Action Plan (CAP), with minor deviations as approved by NDEP. The closure activities specified in the CAP were based on the recommendations presented in the CAU 536 Corrective Action Decision Document (U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office, 2004). This Closure Report documents CAU 536 closure activities. During closure activities, approximately 1,000 cubic yards (yd3) of hydrocarbon waste in the form of TPH- and PAH-impacted soil and debris, approximately 8 yd3 of Pu-239-impacted soil, and approximately 100 yd3 of concrete debris were generated, managed, and disposed of appropriately. Additionally, a previously uncharacterized, buried drum was excavated, removed, and disposed of as hydrocarbon waste as a best management practice. Waste minimization techniques, such as the utilization of laboratory analysis to characterize and classify waste streams, were employed during the performance of closure« less

  16. Closure Report for Corrective Action Unit 104: Area 7 Yucca Flat Atmospheric Test Sites, Nevada National Security Site, Nevada

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    2013-06-27

    This Closure Report (CR) presents information supporting closure of Corrective Action Unit (CAU) 104, Area 7 Yucca Flat Atmospheric Test Sites, and provides documentation supporting the completed corrective actions and confirmation that closure objectives for CAU 104 were met. This CR complies with the requirements of the Federal Facility Agreement and Consent Order (FFACO) that was agreed to by the State of Nevada; the U.S. Department of Energy (DOE), Environmental Management; the U.S. Department of Defense; and DOE, Legacy Management. CAU 104 consists of the following 15 Corrective Action Sites (CASs), located in Area 7 of the Nevada National Securitymore » Site: · CAS 07-23-03, Atmospheric Test Site T-7C · CAS 07-23-04, Atmospheric Test Site T7-1 · CAS 07-23-05, Atmospheric Test Site · CAS 07-23-06, Atmospheric Test Site T7-5a · CAS 07-23-07, Atmospheric Test Site - Dog (T-S) · CAS 07-23-08, Atmospheric Test Site - Baker (T-S) · CAS 07-23-09, Atmospheric Test Site - Charlie (T-S) · CAS 07-23-10, Atmospheric Test Site - Dixie · CAS 07-23-11, Atmospheric Test Site - Dixie · CAS 07-23-12, Atmospheric Test Site - Charlie (Bus) · CAS 07-23-13, Atmospheric Test Site - Baker (Buster) · CAS 07-23-14, Atmospheric Test Site - Ruth · CAS 07-23-15, Atmospheric Test Site T7-4 · CAS 07-23-16, Atmospheric Test Site B7-b · CAS 07-23-17, Atmospheric Test Site - Climax Closure activities began in October 2012 and were completed in April 2013. Activities were conducted according to the Corrective Action Decision Document/Corrective Action Plan for CAU 104. The corrective actions included No Further Action and Clean Closure. Closure activities generated sanitary waste, mixed waste, and recyclable material. Some wastes exceeded land disposal limits and required treatment prior to disposal. Other wastes met land disposal restrictions and were disposed in appropriate onsite landfills. The U.S. Department of Energy, National Nuclear Security Administration Nevada Field Office (NNSA/NFO) requests the following: · A Notice of Completion from the Nevada Division of Environmental Protection to NNSA/NFO for closure of CAU 104 · The transfer of CAU 104 from Appendix III to Appendix IV, Closed Corrective Action Units, of the FFACO« less

  17. Pre-Demolition Inspections

    EPA Pesticide Factsheets

    A pre-demolition inspection may be one of the most helpful and cost-efficient steps you can take to identify materials that should (or must) be removed from buildings prior to demolition. In some cases it may be required by regulation.

  18. ASBESTOS RELEASE DURING BUILDING DEMOLITION ACTIVITIES

    EPA Science Inventory

    The U.S. Environmental Protection Agency's (EPA) Risk Reduction Engineering Laboratory (RREL) monitored block-wide building demolition and debris disposal activities at Santa Cruz and Watsonsville, California following the 1989 earthquake; an implosion demolition of a 26-story bu...

  19. 40 CFR 146.93 - Post-injection site care and site closure.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ...) The pressure differential between pre-injection and predicted post-injection pressures in the... 40 Protection of Environment 23 2011-07-01 2011-07-01 false Post-injection site care and site... Applicable to Class VI Wells § 146.93 Post-injection site care and site closure. (a) The owner or operator of...

  20. 40 CFR 146.93 - Post-injection site care and site closure.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ...) The pressure differential between pre-injection and predicted post-injection pressures in the... 40 Protection of Environment 24 2013-07-01 2013-07-01 false Post-injection site care and site... Applicable to Class VI Wells § 146.93 Post-injection site care and site closure. (a) The owner or operator of...

  1. 40 CFR 146.93 - Post-injection site care and site closure.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ...) The pressure differential between pre-injection and predicted post-injection pressures in the... 40 Protection of Environment 24 2012-07-01 2012-07-01 false Post-injection site care and site... Applicable to Class VI Wells § 146.93 Post-injection site care and site closure. (a) The owner or operator of...

  2. Lead exposure in a tank demolition crew: implications for the new OSHA construction lead standard.

    PubMed

    Waller, K; Osorio, A M; Jones, J

    1994-11-01

    The Federal Occupational Safety and Health Administration (OSHA) has recently extended the basic health and safety provisions of the OSHA lead standard for general industry to workers in the construction industry. In this report we describe a tank demolition worksite that midway through the project strengthened its lead exposure control activities to a level that approximated the current lead standard. Of 12 tested ironworkers and laborers who worked at the site before the change, zinc protoporphyrin levels increased and seven developed blood lead levels (BLL) > 50 micrograms/dL. After the change these workers' BLLs declined. Six workers hired after the change did not experience increases in zinc protoporphyrin and none developed BLL > 25 micrograms/dL. The experience at this worksite demonstrates the usefulness and feasibility of implementing the current lead standard in construction settings.

  3. Conservation of the `Piast' Cinema in Słubice: An Architectural, Urban or Moral Problem?

    NASA Astrophysics Data System (ADS)

    Eckert, Wojciech

    2016-12-01

    For many years, attempts have been made to remove the relic of the `Piast' Cinema in the western town of Słubice from Poland's monuments register. This would allow for its demolition and construction of a modern commercial building on the site. The majority of the building has already be demolished, with only the front elevation remaining. The façade of the cinema has unique artistic value, representing a rare example of the art deco style in the region. The building also forms an important part of the cultural landscape of this border town, representing the history of both Słubice and nearby Frankfurt. With its total demolition, Słubice would lose a unique monument and the entire frontage of the street on which it is located would be downgraded.

  4. 40 CFR 146.93 - Post-injection site care and site closure.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 23 2014-07-01 2014-07-01 false Post-injection site care and site... Applicable to Class VI Wells § 146.93 Post-injection site care and site closure. (a) The owner or operator of a Class VI well must prepare, maintain, and comply with a plan for post-injection site care and site...

  5. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Peters, J.; Glucksberg, N.; Fogg, A.

    During the site closure of nuclear facilities where both radionuclides and chemicals are present in environmental media, state and federal regulatory agencies other than the Nuclear Regulatory Commission often have a stake in the regulation of the site closure process. At the Connecticut Yankee Atomic Power Company (CYAPCO) Haddam Neck Plant in Haddam, Connecticut, the site closure process includes both radiological and chemical cleanup which is regulated by two separate divisions within the state and two federal agencies. Each of the regulatory agencies has unique closure criteria which pertain to radionuclides and, consequently, there is overlapping and in some casesmore » disparate regulation of radionuclides. Considerable effort has been expended by CYAPCO to find common ground in meeting the site closure requirements for radionuclides required by each of the agencies. This paper discusses the approaches that have been used by CYAPCO to address radionuclide site closure requirements. Significant lessons learned from these approaches include the demonstration that public health cleanup criteria for most radionuclides of concern at nuclear power generation facilities are protective for chemical toxicity concerns and are protective for ecological receptors and, consequently, performing a baseline ecological risk assessment for radionuclides at power generation facilities is not generally necessary. (authors)« less

  6. Labor-related fatalities in forensic postmortem investigations during the past 6 years in the southern half of Osaka city and surrounding areas.

    PubMed

    Maeda, Hitoshi; Fujita, Masaki Q; Zhu, Bao-Li; Quan, Li; Kamikodai, Yasunobu; Tsuda, Kohei; Taniguchi, Mari

    2003-03-01

    To investigate fatal factors involved in labor-related accidents and events, forensic postmortem cases (n=874) during the past 6 years (1996-2001) at our institute were reviewed. Among them, there were 67 labor-related fatalities, showing a varied annual incidence (6-15 cases per year). All the victims were males (19-68 years of age). The most common sites of the accidents were manufacturing factories (n=21, 31.3%), warehouses (n=14, 20.9%), construction and demolition sites (n=11 and n=5, 16.4 and 7.5%, respectively). There were some characteristic types of accidents: falls from heights at work during construction and maintenance, and crushes by heavy materials and moving vehicles in transportation, by collapsing structures at demolition sites or by working machinery in factories. The most severely injured body regions were usually the head in falls (n=13/23) and the chest/abdomen in crushes (n=19/32). Most of the victims (n=54, 80.6%) died within 24 h. Alcohol was detected only in four cases. Most accidents were considered to be due to carelessness and simple fault of the workers without any significant relationship to their professional training and career.

  7. Identifying areas under potential risk of illegal construction and demolition waste dumping using GIS tools.

    PubMed

    Seror, Nissim; Portnov, Boris A

    2018-05-01

    Construction and demolition (C&D) waste, dumped illegally in ravines and open areas, contaminates soil and can cause underground water pollution and forests fires. Yet, effective monitoring of illegal C&D waste dumping and enforcing legislation against the offenders are often a difficult task due to the large size of geographic areas that need to be monitored, and limited human and financial resources available to environmental law enforcement agencies. In this study, we use Geographic Information System (GIS) tools and geo-statistical modelling to identify the areas under potentially elevated risk of illegal C&D waste dumping in the Haifa district of Israel. As our analysis shows, locational factors, significantly associated with the accumulated amount of waste in the existing illegal C&D waste sites, include: distance to the nearest main road, depth of the ravine present at the site (p<0.01), and forest proximity (p<0.05). Using the model incorporating these locational parameters, we mapped the areas under the elevated risk of illegal C&D waste dumping for future monitoring. As we suggest, the proposed approach may be useful for environmental law enforcement authorities, by helping them to focus on specific sites for inspection, save resources, and act against the offenders more efficiently. Copyright © 2018 Elsevier Ltd. All rights reserved.

  8. Suitability of Exoseal Vascular Closure Device for Antegrade Femoral Artery Puncture Site Closure

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Schmelter, Christopher, E-mail: christopher.schmelter@klinikum-ingolstadt.de; Liebl, Andrea; Poullos, Nektarios

    Purpose. To assess the efficacy and safety of the Exoseal vascular closure device for antegrade puncture of the femoral artery. Methods. In a prospective study from February 2011 to January 2012, a total of 93 consecutive patients received a total of 100 interventional procedures via an antegrade puncture of the femoral artery. An Exoseal vascular closure device (6F) was used for closure in all cases. Puncture technique, duration of manual compression, and use of compression bandages were documented. All patients were monitored by vascular ultrasound and color-coded duplex sonography of their respective femoral artery puncture site within 12 to 36more » h after angiography to check for vascular complications. Results. In 100 antegrade interventional procedures, the Exoseal vascular closure device was applied successfully for closure of the femoral artery puncture site in 96 cases (96 of 100, 96.0 %). The vascular closure device could not be deployed in one case as a result of kinking of the vascular sheath introducer and in three cases because the bioabsorbable plug was not properly delivered to the extravascular space adjacent to the arterial puncture site, but instead fully removed with the delivery system (4.0 %). Twelve to 36 h after the procedure, vascular ultrasound revealed no complications at the femoral artery puncture site in 93 cases (93.0 %). Minor vascular complications were found in seven cases (7.0 %), with four cases (4.0 %) of pseudoaneurysm and three cases (3.0 %) of significant late bleeding, none of which required surgery. Conclusion. The Exoseal vascular closure device was safely used for antegrade puncture of the femoral artery, with a high rate of procedural success (96.0 %), a low rate of minor vascular complications (7.0 %), and no major adverse events.« less

  9. Identification and Protection of a Bat Colony in the 183-F Clearwell: Mitigation of Bat Habitat on the Hanford Site

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    K. A. Gano, J. G. Lucas, C. T. Lindsey

    An ecological investigation was conducted to evaluate mitigation options for demolition of a retired facility that contained a maternity roost of approximately 2,000 Myotis yumanensis bats. The recommendation from the study was to leave the non-contaminated structure intact and fence the area.

  10. More than Bricks and Mortar

    ERIC Educational Resources Information Center

    Stanistreet, Paul

    2009-01-01

    Gaythorne Row, a terrace of Victorian back-to-back houses in Great Horton, was earmarked for demolition when, in 1986, Bradford Industrial Museum took possession of the three cottages and transported them, brick by brick, to the museum site four miles away. The houses were built in 1876, a year later than the old worsted spinning mill in which the…

  11. A Pictorial History of the Code 717 Unmanned Systems Group: Air, Land, and Sea. Volume 1: 1970-1999

    DTIC Science & Technology

    2016-04-28

    requirements. 54 a) b) Figure 67. a) Site preparation for Building 585 began with demolition of the foundation for the oil -well derrick...Proceedings of the 9th International Conference on Informatics in Control, Automation and Robotics (ICINCO). 28–31 July, Rome, Italy. Pransky, J. 1997

  12. Environmental assessment for the Plating Shop Replacement, Y-12 Plant, Oak Ridge, Tennessee

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1992-03-01

    The existing of Y-12 Plant Plating Shop provides vital support functions for the US Department of Energy (DOE) Defense Programs operations. In addition to weapon component plating, the facility performs other plating services to support existing operations for the Y-12 Plant, other DOE facilities, and other federal agencies. In addition, the facility would also provide essential deplating services for weapons reclamation and teardown. The existing Y-12 Plant Plating Shop is presently located in a structure which is rapidly deteriorating and obsolete. The existing building structure was originally designed to house a steam plant, not chemical plating operations. As such, vaporsmore » from plating operations have deteriorated the structure to a point where a new facility is needed for continued safe operations. The potential environmental impacts of the proposed action was anticipated to be minimal and would affect no environmentally sensitive areas. Some short-term construction- and demolition-related effects would occur in an already highly industrialized setting. These include temporarily disturbing 72,000 square feet of land for the new plating shop and related site preparation activities, constructing a permanent building on part of the area, and using 80 construction personnel over a period of 18 months for site preparation and construction. Demolition effects vary depending on the environmentally suitable option selected, but they could involve as much as 262 cubic yards of concrete rubble and approximately 1600 cubic yards of soil disposed as waste. Either 1600 cubic yards of fresh soil or 1850 yards of clay and fresh soil could be required. Soil erosion would be minimal. Approximately 20 construction personnel would be involved for 12 months in demolition activities.« less

  13. Occupancy estimation and the closure assumption

    USGS Publications Warehouse

    Rota, Christopher T.; Fletcher, Robert J.; Dorazio, Robert M.; Betts, Matthew G.

    2009-01-01

    1. Recent advances in occupancy estimation that adjust for imperfect detection have provided substantial improvements over traditional approaches and are receiving considerable use in applied ecology. To estimate and adjust for detectability, occupancy modelling requires multiple surveys at a site and requires the assumption of 'closure' between surveys, i.e. no changes in occupancy between surveys. Violations of this assumption could bias parameter estimates; however, little work has assessed model sensitivity to violations of this assumption or how commonly such violations occur in nature. 2. We apply a modelling procedure that can test for closure to two avian point-count data sets in Montana and New Hampshire, USA, that exemplify time-scales at which closure is often assumed. These data sets illustrate different sampling designs that allow testing for closure but are currently rarely employed in field investigations. Using a simulation study, we then evaluate the sensitivity of parameter estimates to changes in site occupancy and evaluate a power analysis developed for sampling designs that is aimed at limiting the likelihood of closure. 3. Application of our approach to point-count data indicates that habitats may frequently be open to changes in site occupancy at time-scales typical of many occupancy investigations, with 71% and 100% of species investigated in Montana and New Hampshire respectively, showing violation of closure across time periods of 3 weeks and 8 days respectively. 4. Simulations suggest that models assuming closure are sensitive to changes in occupancy. Power analyses further suggest that the modelling procedure we apply can effectively test for closure. 5. Synthesis and applications. Our demonstration that sites may be open to changes in site occupancy over time-scales typical of many occupancy investigations, combined with the sensitivity of models to violations of the closure assumption, highlights the importance of properly addressing the closure assumption in both sampling designs and analysis. Furthermore, inappropriately applying closed models could have negative consequences when monitoring rare or declining species for conservation and management decisions, because violations of closure typically lead to overestimates of the probability of occurrence.

  14. Postwar City: Importance of Recycling Construction and Demolition Waste

    NASA Astrophysics Data System (ADS)

    Al-Qaraghuli, Hanan; Alsayed, Yaman; Almoghazy, Ali

    2017-10-01

    Wars and armed conflicts have heavy tolls on the built environment when they take place in cities. It is not only restricted to the actually fighting which destroys or damages buildings and infrastructure, but the damage and destruction inflicts its impacts way beyond the cessation of military actions. They can even have another impact through physical segregation of city quarters through walls and checkpoints that complicates, or even terminates, mobility of citizens, goods, and services in the post-war scenario. The accumulation of debris in the streets often impedes the processes of rescue, distribution of aid and services, and other forms of city life as well. Also, the amount of effort and energy needed to remove those residual materials to their final dumping sites divert a lot of urgently needed resources. In this paper, the components of construction and demolition waste found in post-war cities are to be discussed, relating each one to its origins and potential reuses. Then the issues related to the management of construction waste and demolition debris resulting from military actions are to be discussed. First, an outlook is to be given on the historical example of Berlin and how the city was severely damaged during World War II, and how the reconstruction of the city was aided in part by the reuse of demolition debris. Then two more recent examples will be given, the cities of Baghdad in Iraq, and Homs in Syria. In Baghdad, though major military actions have ceased but not all rubble is cleared out, some security structures in the form of concrete walls separate the cities into quarters and impede city life and lie around as poorly allocated resource needed for reconstruction. While in the case of Homs, and the wider Syrian context, major military operations are still raging, making more pressure on the resources needed for reconstruction. This recycling of demolition debris can bring economic and social stability through the conservation of resources, creation of jobs, and - eventually - the stabilization of the society in the midst of an atrocious war. Suggestions for relevant solutions will be given in both cities.

  15. Application of inert wastes in the construction, operation and closure of landfills: Calculation tool.

    PubMed

    Colomer Mendoza, Francisco J; Esteban Altabella, Joan; Gallardo Izquierdo, Antonio

    2017-01-01

    Waste from construction and demolition activities represents one of the highest volumes of waste in Europe. 500 million tonnes are produced throughout the whole EU every year. In some EU members like Spain, approximately 83 per cent of such waste is disposed in landfills. The remaining part is classified and processed in treatment facilities so that it can later be used as recycled aggregates in the construction sector (sand, gravel, aggregates, etc.) but without much commercial success. The aim of this study is to use recycled aggregates from inert wastes (IW) in the different phases of a landfill (construction, operation and closure) with the aid of a new computer tool called LABWASTE.14. This tool incorporates the mathematical relationship among the activities of the landfill and provides as a result the economic viability of using recycled aggregates compared to aggregates from quarries. Therefore, knowing the needs of aggregates in landfills (dams, drainage layers, covering layers, collection wells, etc.) may determine the amount of IW that could be recovered. These calculations can be obtained from some of the data that is introduced (population, land physiography, etc.). Furthermore, the use of LABWASTE.14 makes it possible to reduce the demand for aggregates from quarries. Copyright © 2016 Elsevier Ltd. All rights reserved.

  16. CLOSURE REPORT FOR CORRECTIVE ACTION UNIT165: AREA 25 AND 26 DRY WELL AND WASH DOWN AREAS, NEVADA TEST SITE, NEVADA

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    BECHTEL NEVADA

    This Closure Report (CR) documents the closure activities for Corrective Action Unit (CAU) 165, Area 25 and 26 Dry Well and Washdown Areas, according to the Federal Facility Agreement and Consent Order (FFACO) of 1996. CAU 165 consists of 8 Corrective Action Sites (CASs) located in Areas 25 and 26 of the Nevada Test Site (NTS). The NTS is located approximately 105 kilometers (65 miles) northwest of Las Vegas, nevada. Site closure activities were performed according to the Nevada Division of Environmental Protection (NDEP)-approved Corrective Action Plan (CAP) for CAU 165. CAU 165 consists of the following CASs: (1) CASmore » 25-07-06, Train Decontamination Area; (2) CAS 25-07-07, Vehicle Washdown; (3) CAS 25-20-01, Lab Drain Dry Well; (4) CAS 25-47-01, Reservoir and French Drain; (5) CAS 25-51-02, Drywell; (6) CAS 25-59-01, Septic System; (7) CAS 26-07-01, Vehicle Washdown Station; and (8) CAS 26-59-01, Septic System. CAU 165, Area 25 and 26 Dry Well and Washdown Areas, consists of eight CASs located in Areas 25 and 26 of the NTS. The approved closure alternatives included No Further Action, Clean Closure, and Closure in Place with Administrative Controls.« less

  17. 75 FR 28655 - Rexam Closure Systems, Inc. a Subsidiary of Rexam PLC Including On-Site Leased Workers From...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-21

    ..., Inc. a Subsidiary of Rexam PLC Including On-Site Leased Workers From Addeco Employment Services..., applicable to the workers of Rexam Closure Systems, Inc., a subsidiary of Rexam PLC, Hamlet, North Carolina... Rexam Closure Systems, Inc., a subsidiary of Rexam PLC purchased Owens Illinois Manufacturing. Some...

  18. 40 CFR 264.142 - Cost estimate for closure.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... the cost of final closure at the point in the facility's active life when the extent and manner of its... costs for on-site disposal if he can demonstrate that on-site disposal capacity will exist at all times over the life of the facility. (3) The closure cost estimate may not incorporate any salvage value that...

  19. 188. Photocopy of drawing (1975 demolition drawing by the Ralph ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    188. Photocopy of drawing (1975 demolition drawing by the Ralph M. Parsons Company) DEMOLITION AND REMOVAL PLANS FOR MST STATION 39, 48, 55.5, AD 63, SHEET D-6 - Vandenberg Air Force Base, Space Launch Complex 3, Launch Pad 3 East, Napa & Alden Roads, Lompoc, Santa Barbara County, CA

  20. 22 CFR 121.11 - Military demolition blocks and blasting caps.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 22 Foreign Relations 1 2013-04-01 2013-04-01 false Military demolition blocks and blasting caps. 121.11 Section 121.11 Foreign Relations DEPARTMENT OF STATE INTERNATIONAL TRAFFIC IN ARMS REGULATIONS THE UNITED STATES MUNITIONS LIST Enumeration of Articles § 121.11 Military demolition blocks and...

  1. 22 CFR 121.11 - Military demolition blocks and blasting caps.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 22 Foreign Relations 1 2011-04-01 2011-04-01 false Military demolition blocks and blasting caps. 121.11 Section 121.11 Foreign Relations DEPARTMENT OF STATE INTERNATIONAL TRAFFIC IN ARMS REGULATIONS THE UNITED STATES MUNITIONS LIST Enumeration of Articles § 121.11 Military demolition blocks and...

  2. 22 CFR 121.11 - Military demolition blocks and blasting caps.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 22 Foreign Relations 1 2012-04-01 2012-04-01 false Military demolition blocks and blasting caps. 121.11 Section 121.11 Foreign Relations DEPARTMENT OF STATE INTERNATIONAL TRAFFIC IN ARMS REGULATIONS THE UNITED STATES MUNITIONS LIST Enumeration of Articles § 121.11 Military demolition blocks and...

  3. 22 CFR 121.11 - Military demolition blocks and blasting caps.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 22 Foreign Relations 1 2014-04-01 2014-04-01 false Military demolition blocks and blasting caps. 121.11 Section 121.11 Foreign Relations DEPARTMENT OF STATE INTERNATIONAL TRAFFIC IN ARMS REGULATIONS THE UNITED STATES MUNITIONS LIST Enumeration of Articles § 121.11 Military demolition blocks and...

  4. Effect of the implosion and demolition of a hospital building on the concentration of fungi in the air.

    PubMed

    Barreiros, Gloria; Akiti, Tiyomi; Magalhães, Ana Cristina Gouveia; Nouér, Simone A; Nucci, Marcio

    2015-12-01

    Building renovations increase the concentration of Aspergillus conidia in the air. In 2010, one wing of the hospital building was imploded due to structural problems. To evaluate the impact of building implosion on the concentration of fungi in the air, the demolition was performed in two phases: mechanical demolition of 30 m of the building, followed by implosion of the wing. Patients at high risk for aspergillosis were placed in protected wards. Air sampling was performed during mechanical demolition, on the day of implosion and after implosion. Total and specific fungal concentrations were compared in the different areas and periods of sampling, using the anova test. The incidence of IA in the year before and after implosion was calculated. The mean concentration of Aspergillus increased during mechanical demolition and on the day of implosion. However, in the most protected areas, there was no significant difference in the concentration of fungi. The incidence of invasive aspergillosis (cases per 1000 admissions) was 0.9 in the 12 months before, 0.4 during, and 0.5 in the 12 months after mechanical demolition (P > 0.05). Continuous monitoring of the quality of air and effective infection control measures are important to minimize the impact of building demolition. © 2015 Blackwell Verlag GmbH.

  5. Humid site stabilization and closure

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Cutshall, N.H.

    1981-01-01

    The purpose of the work described here is to identify and evaluate the importance of factors that are expected to dictate the nature of site stabilization and closure requirements. Subsequent efforts will plan for implementation of such requirements. Two principal areas of site stabilization and closure effort will be pursued initially - geological management and vegetation management. The geological effort will focus on chemical weathering and surficial erosion. Such catastrophic geologic events as landslides, flooding, earthquakes, volcanos, etc. are already considered in site selection and operation and these factors will not be emphasized initially. Vegetation management will be designed tomore » control erosion, to minimize nuclide mobilization by roots and to be compatible with natural successional pressures. It is anticipated that the results of this work will be important both to site selection and operation as well as the actual stabilization and closure procedure.« less

  6. Methodology of environmental diagnosis for construction and demolition waste landfills: a tool for planning and making decisions.

    PubMed

    Garrido, E; Calvo, F; Ramos, A F; Zamorano, M

    2005-11-01

    Current legislation in the European Union regarding landfills provides measures, procedures and guidance to prevent or reduce, insofar as possible, negative effects on the environment. This means that Member States must take measures so that landfills cannot operate unless the operator first presents a plan for the site, which includes the implementation of improvements considered necessary by the engineer for compliance with regulations. Researchers at the University of Granada have developed a method to ascertain the degree of environmental impact that a construction and demolition waste landfill may produce on its immediate surroundings. This methodology is based on environmental indexes; its objective is to give crucial information concerning possible environmental problems produced by a landfill. The data thus obtained will permit the elaboration of guidelines for improvements in the location, design, and operation of landfills, or in extreme cases, their dosing, sealing, and rehabilitation.

  7. Streamlined Approach for Environmental Restoration Plan for Corrective Action Unit 574: Neptune, Nevada National Security Site, Nevada

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NSTec Environmental Restoration

    2011-08-31

    This Streamlined Approach for Environmental Restoration (SAFER) Plan identifies the activities required for closure of Corrective Action Unit (CAU) 574, Neptune. CAU 574 is included in the Federal Facility Agreement and Consent Order (FFACO) (1996 [as amended March 2010]) and consists of the following two Corrective Action Sites (CASs) located in Area 12 of the Nevada National Security Site: (1) CAS 12-23-10, U12c.03 Crater (Neptune); (2) CAS 12-45-01, U12e.05 Crater (Blanca). This plan provides the methodology for the field activities that will be performed to gather the necessary information for closure of the two CASs. There is sufficient information andmore » process knowledge regarding the expected nature and extent of potential contaminants to recommend closure of CAU 574 using the SAFER process. Based on historical documentation, personnel interviews, site process knowledge, site visits, photographs, field screening, analytical results, the results of the data quality objective (DQO) process (Section 3.0), and an evaluation of corrective action alternatives (Appendix B), closure in place with administrative controls is the expected closure strategy for CAU 574. Additional information will be obtained by conducting a field investigation to verify and support the expected closure strategy and provide a defensible recommendation that no further corrective action is necessary. This will be presented in a Closure Report that will be prepared and submitted to the Nevada Division of Environmental Protection (NDEP) for review and approval.« less

  8. Divided and Sliding Superficial Temporal Artery Flap for Primary Donor-site Closure

    PubMed Central

    Sugio, Yuta; Seike, Shien; Hosokawa, Ko

    2016-01-01

    Summary: Superficial temporal artery (STA) flaps are often used for reconstruction of hair-bearing areas. However, primary closure of the donor site is not easy when the size of the necessary skin island is relatively large. In such cases, skin grafts are needed at the donor site, resulting in baldness. We have solved this issue by applying the divided and sliding flap technique, which was first reported for primary donor-site closure of a latissimus dorsi musculocutaneous flap. We applied this technique to the hair-bearing STA flap, where primary donor-site closure is extremely beneficial for preventing baldness consequent to skin grafting. The STA flap was divided into 3, and creation of large flap was possible. Therefore, we concluded that the divided and sliding STA flap could at least partially solve the donor-site problem. Although further investigation is necessary to validate the maximum possible flap size, this technique may be applicable to at least small defects that are common after skin cancer ablation or trauma. PMID:27975020

  9. RDX binds to the convulsant site of the GABAA receptor and increases spontaneous firing rates of cortical neurons in vitro

    EPA Science Inventory

    RDX (hexahydro-1 ,3,5-trinitro-1 ,3,5-triazine, hexogen, Royal Demolition eXplosive) is an explosive widely used by the military and has been found in soil and ground water in and surrounding training ranges, creating potential hazards to the environment and human health. Oral RD...

  10. Magnetic Field Disturbances Associated with changes in Lithologic Stress

    NASA Astrophysics Data System (ADS)

    Johnston, J. M.; Budker, D.; Johnson, R. M.; Tchernychev, M.; Craig, M. S.

    2013-12-01

    In August 2013 demolition by implosion of a multistory building on the campus of California State University East Bay (CSUEB) provided a strong seismic wave source. Anticipating that this event might provide an opportunity to acquire measurements of magnetic phenomena that could be associated with temporal changes in the lithologic stress regime, we placed several total-field magnetometers in the vicinity of CSUEB. The proximity of the implosion site to the active trace of the Hayward Fault provided additional incentive to measure any magnetic response to the propagation of seismic waves. The instruments used at the implosion site included three total-field cesium vapor magnetometers. These were distributed so as to acquire measurements within 200 m of the implosion site and to straddle the Hayward fault. This experiment also used the total magnetic field measurements acquired at the Jasper Ridge Biological Preserve (JRBP) cesium vapor magnetometer in the foothills behind Stanford University, some 20 km from the implosion site, as a distant reference. All magnetometers were configured to sample at a rate of 10 Hz and were synchronized to better that 1 mSec relative to GPS time. The Magnetic field measurements were coordinated with seismic motion measurements recorded at approximately 600 residential seismic stations and several multichannel seismographs located around the demolition site. Magnetic phenomena that may be associated with lithologic stress phenomena are compared to the seismic measurements in an effort to the observe correlations between lithologic stress and the generation of an anomalous magnetic field. The coherence of the magnetic and seismic events should provide insight into the character of possible earthquake precursor magnetic signals.

  11. C D debris: Construction and dismantling

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Woods, R.

    1994-04-01

    After years of sophisticated recycling efforts in the field of construction and demolition (C D) debris cleanup, today's construction sites are beginning to show signs of a change in philosophy: Today's lumber scraps and concrete rubble are tomorrow's raw materials. With this transformation from refuse to resource, the image of the wrecking ball sending concrete, metal, roofing material, and drywall cascading as one into a twisted heap on the ground may soon become a thing of the past. While the wrecking ball will still be there at many sites, the piles of C D it produces are getting cleaner andmore » more homogeneous -- a crucial factor in the marketing success of any commodity. As the bulky nature of the material elicits more landfill bans each year and tip fees continue to climb, many new building projects are placing a greater emphasis on C D debris reuse and recycling, beginning with the bid specification itself. Along with all the other details in the construction or demolition contract, it is becoming popular to include assessment of what C D materials will be produced and to list in the specification package, up front, the planned end uses for the materials before the first sledgehammer falls.« less

  12. Transition and closeout of the Fernald Closure Project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bilson, H.E.; Terry, T.; Reising, J.

    The U.S. Department of Energy (DOE) and Fluor Fernald have completed the majority of the cleanup of the Fernald Site. The over 1,000 acre complex for processing uranium has been demolished and soil contamination has been remediated. With acres of wetlands and prairies replacing the buildings and waste pits. At the end of the project the focus shifted to developing demonstrating the completion of the project and the contract, as well as ensuring a smooth transition of the facility from the DOE's Environmental Management (EM) Program to the DOE's Legacy Management (LM) Program. Working with the DOE, each portion ofmore » the closure contract was examined for specific closure definition. From this negotiation effort the Comprehensive Exit and Transition Plan (CE/T Plan) was written. The CE/T Plan is intended to assist DOE in the analysis that the site is ready for transfer into long-term stewardship (LTS) (also referred to as legacy management) and that Fluor Fernald, Inc. has satisfactorily completed the closure contract statement of work elements. Following the Lessons Learned from the closure of the Rocky Flats Site, the DOE's Legacy Management Program created a matrix of Transition Elements required to ensure adequate information was in place to allow the new prime contractor to perform the Legacy Management scope of work. The transition plan included over 1,000 elements broken down into functional areas and relied on specific Fernald Responsibility Transition Packages (RTPs) for detailed transition actions. The template for Closure and Transition Planning used at the Fernald Site was developed using the best Lessons Learned from across the DOE Complex. The template could be used for other sites, and lessons learned from this closure and transition will be appropriate for all closure projects. (authors)« less

  13. 48 CFR 52.249-3 - Termination for Convenience of the Government (Dismantling, Demolition, or Removal of Improvements).

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Convenience of the Government (Dismantling, Demolition, or Removal of Improvements). 52.249-3 Section 52.249-3... Convenience of the Government (Dismantling, Demolition, or Removal of Improvements). As prescribed in 49.502(b)(2), insert the following clause: Termination for Convenience of the Government (Dismantling...

  14. 22 CFR 121.11 - Military demolition blocks and blasting caps.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 22 Foreign Relations 1 2010-04-01 2010-04-01 false Military demolition blocks and blasting caps... blasting caps. Military demolition blocks and blasting caps referred to in Category IV(a) do not include the following articles: (a) Electric squibs. (b) No. 6 and No. 8 blasting caps, including electric...

  15. Modeling end-of-life pathways of construction and demolition debris in the United States (poster for LCM 2017)

    EPA Science Inventory

    In 2013, the United States generated 530 million tons of construction and demolition debris (CDD), 90% of which was related to demolition. Despite this major contribution to national waste streams, Life Cycle Assessment (LCA) studies and product declarations of buildings and buil...

  16. 75 FR 73962 - Safety Zone; Bridge Demolition; Illinois River, Seneca, IL

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-30

    ...-AA00 Safety Zone; Bridge Demolition; Illinois River, Seneca, IL AGENCY: Coast Guard, DHS. ACTION... due to the demolition of the Seneca Highway Bridge. This temporary safety zone is necessary to protect... Highway Bridge. DATES: This rule is effective in the CFR on November 30, 2010 through 6 a.m. on December...

  17. Corrective Action Decision Document/Corrective Action Plan for the 92-Acre Area and Corrective Action Unit 111: Area 5 WMD Retired Mixed Waste Pits, Nevada National Security Site, Nevada

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NSTec Environmental Restoration

    This Corrective Action Decision Document/Corrective Action Plan (CADD/CAP) has been prepared for the 92-Acre Area, the southeast quadrant of the Radioactive Waste Management Site, located in Area 5 of the Nevada National Security Site (NNSS). The 92-Acre Area includes Corrective Action Unit (CAU) 111, 'Area 5 WMD Retired Mixed Waste Pits.' Data Quality Objectives (DQOs) were developed for the 92-Acre Area, which includes CAU 111. The result of the DQO process was that the 92-Acre Area is sufficiently characterized to provide the input data necessary to evaluate corrective action alternatives (CAAs) without the collection of additional data. The DQOs aremore » included as Appendix A of this document. This CADD/CAP identifies and provides the rationale for the recommended CAA for the 92-Acre Area, provides the plan for implementing the CAA, and details the post-closure plan. When approved, this CADD/CAP will supersede the existing Pit 3 (P03) Closure Plan, which was developed in accordance with Title 40 Code of Federal Regulations (CFR) Part 265, 'Interim Status Standards for Owners and Operators of Hazardous Waste Treatment, Storage, and Disposal Facilities.' This document will also serve as the Closure Plan and the Post-Closure Plan, which are required by 40 CFR 265, for the 92-Acre Area. After closure activities are complete, a request for the modification of the Resource Conservation and Recovery Act Permit that governs waste management activities at the NNSS will be submitted to the Nevada Division of Environmental Protection to incorporate the requirements for post-closure monitoring. Four CAAs, ranging from No Further Action to Clean Closure, were evaluated for the 92-Acre Area. The CAAs were evaluated on technical merit focusing on performance, reliability, feasibility, safety, and cost. Based on the evaluation of the data used to develop the conceptual site model; a review of past, current, and future operations at the site; and the detailed and comparative analysis of the potential CAAs, Closure in Place with Administrative Controls is the preferred CAA for the 92-Acre Area. Closure activities will include the following: (1) Constructing an engineered evapotranspiration cover over the 92-Acre Area; (2) Installing use restriction (UR) warning signs, concrete monuments, and subsidence survey monuments; (3) Establishing vegetation on the cover; (4) Implementing a UR; and (5) Implementing post-closure inspections and monitoring. The Closure in Place with Administrative Controls alternative meets all requirements for the technical components evaluated, fulfills all applicable federal and state regulations for closure of the site, and will minimize potential future exposure pathways to the buried waste at the site.« less

  18. Corrective Action Decision Document/Corrective Action Plan for the 92-Acre Area and Corrective Action Unit 111: Area 5 WMD Retired Mixed Waste Pits, Nevada Test Site, Nevada

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NSTec Environmental Restoration

    2009-07-31

    This Corrective Action Decision Document/Corrective Action Plan (CADD/CAP) has been prepared for the 92-Acre Area, the southeast quadrant of the Radioactive Waste Management Site, located in Area 5 of the Nevada Test Site (NTS). The 92-Acre Area includes Corrective Action Unit (CAU) 111, 'Area 5 WMD Retired Mixed Waste Pits.' Data Quality Objectives (DQOs) were developed for the 92-Acre Area, which includes CAU 111. The result of the DQO process was that the 92-Acre Area is sufficiently characterized to provide the input data necessary to evaluate corrective action alternatives (CAAs) without the collection of additional data. The DQOs are includedmore » as Appendix A of this document. This CADD/CAP identifies and provides the rationale for the recommended CAA for the 92-Acre Area, provides the plan for implementing the CAA, and details the post-closure plan. When approved, this CADD/CAP will supersede the existing Pit 3 (P03) Closure Plan, which was developed in accordance with Title 40 Code of Federal Regulations (CFR) Part 265, 'Interim Status Standards for Owners and Operators of Hazardous Waste Treatment, Storage, and Disposal Facilities.' This document will also serve as the Closure Plan and the Post-Closure Plan, which are required by 40 CFR 265, for the 92-Acre Area. After closure activities are complete, a request for the modification of the Resource Conservation and Recovery Act Permit that governs waste management activities at the NTS will be submitted to the Nevada Division of Environmental Protection to incorporate the requirements for post-closure monitoring. Four CAAs, ranging from No Further Action to Clean Closure, were evaluated for the 92-Acre Area. The CAAs were evaluated on technical merit focusing on performance, reliability, feasibility, safety, and cost. Based on the evaluation of the data used to develop the conceptual site model; a review of past, current, and future operations at the site; and the detailed and comparative analysis of the potential CAAs, Closure in Place with Administrative Controls is the preferred CAA for the 92-Acre Area. Closure activities will include the following: (1) Constructing an engineered evapotranspiration cover over the 92-Acre Area; (2) Installing use restriction (UR) warning signs, concrete monuments, and subsidence survey monuments; (3) Establishing vegetation on the cover; (4) Implementing a UR; and (5) Implementing post-closure inspections and monitoring. The Closure in Place with Administrative Controls alternative meets all requirements for the technical components evaluated, fulfills all applicable federal and state regulations for closure of the site, and will minimize potential future exposure pathways to the buried waste at the site.« less

  19. WHAT ARE THE BEST MEANS TO ASSESS CONTAMINANT TRANSPORT AND BIODEGRADATION AND MOVE TOWARD CLOSURE, USING APPROPRIATE SITE-SPECIFIC RISK EVALUATIONS?

    EPA Science Inventory

    Site remedy and closure decisions are made from a mixture of site data, literature values, and model results. Often assessment of this information is difficult for State Agency case managers because conventional approaches to site characterization do not yield a clear and strai...

  20. Stabilization of soils contaminated with explosives and metals from the ammunition demolition activity area and miscellaneous sites at the Umatilla Depot

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lear, P.R.; Gemarr, D.

    1997-12-31

    The US Army Umatilla Depot (UMD) was established as an ordnance depot in 1941 to store, preserve, and perform minor maintenance on conventional and chemical munitions. From the 1940`s until the present, UMD operated periodically at the 32 miscellaneous sites identified as OU-5. OU-4 consists of twenty sites within the Ammunition Demolition Activity Area. Typical activities conducted at these sites consisted of operations to burn, detonate, and otherwise dispose of ordnance, munitions casings, and other solids wastes. Five sites were selected for remedial action. The remediation contaminants of concern for the sites encompassed both metallic and non-metallic elements and bothmore » inorganic and organic compounds. The remedial action selected for the contaminated soil at these sites was stabilization/solidification (S/S). The site remediation activities for the five sites were performed by OHM Remediation Services Corp. (OHM) under the supervision of the US Army Corps of Engineers (USACE) Seattle District. The remedial action included treatability mix design testing, mobilization and field setup, soil excavation and processing, and S/S treatment. Stabilized soil samples were collected as grab samples from the pugmill discharge conveyor at a rate of every 75 tons of soil feed, corresponding to an individual production lot. None of the 437 production lots failed to meet the UCS requirement of 50 psi, however, 31 (7%) of the 437 lots failed for either TCLP-leachable metals or explosives. With one exception, all production lots which failed were due to exceedances of the TCLP-leachable explosives requirements. Of these 30 lots, 22 lots were from the OU-5 metals sites and were not expected to contain significant amounts of explosives. The areas in the landfill corresponding to these lots were excavated and the material reprocessed.« less

  1. Corrective Action Decision Document/Closure Report for Corrective Action Unit 567: Miscellaneous Soil Sites - Nevada National Security Site, Nevada

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Matthews, Patrick

    2014-12-01

    This Corrective Action Decision Document/Closure Report presents information supporting the closure of Corrective Action Unit (CAU) 567: Miscellaneous Soil Sites, Nevada National Security Site, Nevada. The purpose of this Corrective Action Decision Document/Closure Report is to provide justification and documentation supporting the recommendation that no further corrective action is needed for CAU 567 based on the implementation of the corrective actions. The corrective actions implemented at CAU 567 were developed based on an evaluation of analytical data from the CAI, the assumed presence of COCs at specific locations, and the detailed and comparative analysis of the CAAs. The CAAs weremore » selected on technical merit focusing on performance, reliability, feasibility, safety, and cost. The implemented corrective actions meet all requirements for the technical components evaluated. The CAAs meet all applicable federal and state regulations for closure of the site. Based on the implementation of these corrective actions, the DOE, National Nuclear Security Administration Nevada Field Office provides the following recommendations: • No further corrective actions are necessary for CAU 567. • The Nevada Division of Environmental Protection issue a Notice of Completion to the DOE, National Nuclear Security Administration Nevada Field Office for closure of CAU 567. • CAU 567 be moved from Appendix III to Appendix IV of the FFACO.« less

  2. Asbestos exposure during renovation and demolition of asbestos-cement clad buildings

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Brown, S.K.

    External asbestos cement (AC) claddings become weathered after many years by the gradual loss of cement from exposed surfaces; as a result, loosely bound layers enriched with asbestos fibers are formed. Asbestos fibers on such weathered surfaces may be mixtures of chrysotile with amosite or crocidolite. Renovation and demolition of old AC clad buildings could cause asbestos fiber emission, but this has not been investigated in the past. The exposure of workers to asbestos dust during these operations and precautions to minimize exposure now have been investigated at several building sites. Asbestos dust concentrations during water jet cleaning or paintingmore » of weathered AC roofing were approximately 0.1 to 0.2 fibers per milliliter (f/mL). Limited results suggest that concentrations may be reduced substantially by avoiding abrasion of surfaces. Concentrations during AC roof replacement averaged approximately 0.1 f/mL and were reduced markedly by employing more careful work procedures. Asbestos dust concentrations during demolition by removal of whole sheets averaged 0.3 to 0.6 f/mL for roofs and less than 0.1 f/mL for walls, reflecting the significant differences in extent of weathering between these elements. Suppression of asbestos emissions from roof sheets by wetting or sealing of weathered surfaces was not predictable because of the occurrence of asbestos fibers in dust trapped under sheet laps.« less

  3. Composite three-layer closure of oral antral communication with 10 months follow-up-a case study.

    PubMed

    Weinstock, Robert J; Nikoyan, Levon; Dym, Harry

    2014-02-01

    We propose a 3-layer composite closure technique for an oral antral communication (OAC) while avoiding secondary donor site morbidity. A patient had developed a 1-cm OAC after extraction of right maxillary first molar. The patient subsequently developed acute maxillary sinusitis. The patient was taken to the operating room, and a Caldwell-Luc procedure was performed. The bony window from the Caldwell-Luc was "press fit" over the bony OAC defect. Soft tissue closure was then achieved with a buccal fat pad flap and a buccal mucosal advancement flap. The patient was examined on postoperative day 5 and 1, 2, 3, 6, and 10 months postoperatively. The acute sinusitis had resolved. The soft tissue closure was successful. The bone graft remained intact, prevented sinus pneumatization, and restored continuity to the floor of the maxillary sinus. The presented technique for 3-layer closure of OACs allows for the stability of a double-layer closure of OAC with the added benefit of bone grafting from single operative site, achieving stable oral antral closure, bone grafting, and the avoidance of secondary donor site morbidity. Copyright © 2014 American Association of Oral and Maxillofacial Surgeons. Published by Elsevier Inc. All rights reserved.

  4. Corrective Action Decision Document/Closure Report for Corrective Action Unit 570: Area 9 Yucca Flat Atmospheric Test Sites, Nevada National Security Site, Nevada, Revision 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Matthews, Patrick

    2013-11-01

    This Corrective Action Decision Document/Closure Report presents information supporting the closure of Corrective Action Unit (CAU) 570: Area 9 Yucca Flat Atmospheric Test Sites, Nevada National Security Site, Nevada. This complies with the requirements of the Federal Facility Agreement and Consent Order (FFACO) that was agreed to by the State of Nevada; U.S. Department of Energy (DOE), Environmental Management; U.S. Department of Defense; and DOE, Legacy Management. The purpose of the CADD/CR is to provide justification and documentation supporting the recommendation that no further corrective action is needed.

  5. Closure Report for Corrective Action Unit 394: Areas 12, 18, and 29 Spill/Release Sites, Nevada Test Site, Nevada: Revision 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office

    This Closure Report (CR) presents information supporting a closure recommendation for Corrective Action Unit (CAU) 394: Areas 12, 18, and 29 Spill/Release Sites, Nevada Test Site, Nevada, in compliance with the requirements of the Federal Facility Agreement and Consent Order. This CAU contains six Corrective Action Sites (CASs): 12-25-04, UST 12-16-2 Waste Oil Release; 18-25-01, 18-25-02, 18-25-03, Oil Spills; 18-25-04, Spill (Diesel Fuel); and 29-44-01, Fuel Spill, located within Areas 12, 18, and 29 on the Nevada Test Site. The purpose of this CR is to provide documentation supporting recommendations of no further action or closure in place for CASsmore » within CAU 394. Throughout late 2002 and early to mid 2003, closure activities were performed as set forth in the CAU 394 Streamlined Approach for Environmental Restoration Plan. The closure activities identified the nature and extent of contaminants of potential concern at the CASs, and provided sufficient information and data to complete appropriate corrective actions for the CASs. Soil in CASs 18-25-02 and 18-25-03 containing polychlorinated biphenyls exceeding the action levels established by the Nevada Administrative Code were removed for proper disposal. The soil remaining in these CASs containing petroleum hydrocarbons exceeding the action level were closed in place with use restrictions. Corrective Action Sites 18-25-04 required no further corrective action; closure in place is required at CASs 12-25-04, 18-25-01, 18-25-02, 18-25-03, and 29-44-01; and use restrictions are required at CASs 12-25-04, 18-25-01, 18-25-02, 18-25-03 and 29-44-01. In summary, no corrective action plan is required for CAU 394.« less

  6. Is adhesive paper-tape closure of video assisted thoracoscopic port-sites safe?

    PubMed

    Luckraz, Heyman; Rammohan, Kandadai S; Phillips, Mabel; O'Keefe, Peter A

    2007-07-01

    Video assisted thoracoscopic surgery (VATS) is used in lung surgery for diagnostic, staging, curative and palliative purposes. The port-sites are usually sutured with dissolvable sutures. The use of adhesive paper-tape for port-site closure was assessed by a prospective randomised double-blind control trial comparing sutured to adhesive paper-tape closure. The following outcomes were assessed: incidence of clinically significant pneumothorax, wound healing using the ASEPSIS score, patient's comfort (pain score using a visual analog score), the time difference between the two techniques of wound closure and cost savings. Thirty patients were recruited in each group. No clinically significant pneumothoraces occurred in either group. There were no significant differences between the two groups in terms of immediate post-operative pain scores, wound cosmesis and wound complications. It was quicker to close the wound with adhesive paper-tape with a mean time of closure per unit length of wound of 9.3 and 2.2s/mm for the groups, respectively. The cost for wound closure (per patient) was $0.8 for the adhesive paper-tape group and $4.00 for the sutures.

  7. Columbus Closure Project Released without Radiological Restrictions

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Henderson, G.

    2007-07-01

    The Columbus Closure Project (CCP), a historic radiological research complex, was cleaned up for future use without radiological restriction in 2006. The CCP research and development site contributed to national defense, nuclear fuel fabrication, and the development of safe nuclear reactors in the United States until 1988 when research activities were concluded for site decommissioning. In November of 2003, the Ohio Field Office of the U.S. Department of Energy contracted ECC/E2 Closure Services, LLC (Closure Services) to complete the removal of radioactive contamination from of a 1955 era nuclear sciences area consisting of a large hot cell facility, research reactormore » building and underground piping. The project known as the Columbus Closure Project (CCP) was completed in 27 months and brought to a close 16 years of D and D in Columbus, Ohio. This paper examines the project innovations and challenges presented during the Columbus Closure Project. The examination of the CCP includes the project regulatory environment, the CS safety program, accelerated clean up innovation, project execution strategies and management of project waste issues and the regulatory approach to site release 'without radiological restrictions'. (authors)« less

  8. 77 FR 70684 - Safety Zone; Bridge Demolition Project; Indiana Harbor Canal, East Chicago, IN

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-27

    ...-AA00 Safety Zone; Bridge Demolition Project; Indiana Harbor Canal, East Chicago, IN AGENCY: Coast Guard... from a portion of the Indiana Harbor Canal due to the demolition Project on the Cline Avenue Bridge... bridge, which are discussed further below. Under 5 U.S.C. 553(d)(3), the Coast Guard finds that good...

  9. 78 FR 2616 - Safety Zone; Bridge Demolition Project; Indiana Harbor Canal, East Chicago, IN

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-14

    ...-AA00 Safety Zone; Bridge Demolition Project; Indiana Harbor Canal, East Chicago, IN AGENCY: Coast Guard... from a portion of the Indiana Harbor Canal due to the demolition Project on the Cline Avenue Bridge... Bridge, which are discussed further below. Under 5 U.S.C. 553(d)(3), the Coast Guard finds that good...

  10. Leaching behaviour of hazardous demolition waste.

    PubMed

    Roussat, Nicolas; Méhu, Jacques; Abdelghafour, Mohamed; Brula, Pascal

    2008-11-01

    Demolition wastes are generally disposed of in unlined landfills for inert waste. However, demolition wastes are not just inert wastes. Indeed, a small fraction of demolition waste contains components that are hazardous to human health and the environment, e.g., lead-based paint, mercury-contained in fluorescent lamps, treated wood, and asbestos. The objective of this study is to evaluate the release potential of pollutants contained in these hazardous components when they are mixed with inert wastes in unlined landfills. After identification of the different building products which can contain hazardous elements and which can be potentially pollutant in landfill scenario, we performed leaching tests using three different lysimeters: one lysimeter containing only inert wastes and two lysimeters containing inert wastes mixed with hazardous demolition wastes. The leachates from these lysimeters were analysed (heavy metals, chlorides, sulphates fluoride, DOC (Dissolved Organic Carbon), phenol index, and PAH). Finally, we compared concentrations and cumulative releases of elements in leachates with the limits values of European regulation for the acceptance of inert wastes at landfill. Results indicate that limit values are exceeded for some elements. We also performed a percolation column test with only demolition hazardous wastes to evaluate the specific contribution of these wastes in the observed releases.

  11. Demolition waste generation for development of a regional management chain model.

    PubMed

    Bernardo, Miguel; Gomes, Marta Castilho; de Brito, Jorge

    2016-03-01

    Even though construction and demolition waste (CDW) is the bulkiest waste stream, its estimation and composition in specific regions still faces major difficulties. Therefore new methods are required especially when it comes to make predictions limited to small areas, such as counties. This paper proposes one such method, which makes use of data collected from real demolition works and statistical information on the geographical area under study. Based on a correlation analysis between the demolition waste estimates and indicators such as population density, buildings ageing index, buildings density and land occupation type, relationships are established that can be used to determine demolition waste outputs in a given area. The derived models are presented and explained. This methodology is independent from the specific region with which it is exemplified (the Lisbon Metropolitan Area) and can therefore be applied to any region of the world, from the country to the county level. Generation of demolition waste data at the county level is the basis of the design of a systemic model for CDW management in a region. Future developments proposed include a mixed-integer linear programming formulation of such recycling network. Copyright © 2016 Elsevier Ltd. All rights reserved.

  12. JSOU and NDIA SO/LIC Division Essays (2007)

    DTIC Science & Technology

    2007-04-01

    Create several content-rich Darknet environments—a private virtual network where users connect only to people they trust7—that offer e-mail, file...chat rooms, and Darknets ). Moon: Cyber-Herding Cyber-Herding Nodes and Relationship Network Gatherer Construction Demolition Structure of Cyber-Herding...the extrem- ist messages, concentrating Web sites, and developing Darknets . A visual illustration of the entire process follows Phase 7. Phase 5

  13. Site closure management strategies and the responsiveness of conservation outcomes in recreational fishing.

    PubMed

    Gao, Lei; Hailu, Atakelty

    2018-02-01

    We develop and use an empirically based model, which integrates fishing behaviour and a coral reef system, to evaluate outcomes from site closure strategies to manage the effects of recreational fishing. The model is designed to estimate management effects in complex settings with two-way feedback effects (between fishing and ecosystem dynamics) as well as spillover effects where the closure of a site (or sites) leads to the redistribution of fishing effort. An iconic coral reef system is used as a case study. The results demonstrate that some site closure strategies provide little incremental benefits over less stringent approaches. They also show that some strategies targeting more sites are actually inferior to more limited strategies, demonstrating that, in the analysis of complex problems involving feedback effects and substitutions, there is little substitute for the use of empirically based and sound modelling as the basis for informed conservation decision making and stakeholder consultation. These findings have direct relevance not only for policies aimed at improving recreational fishing management but also for securing the supply of marine ecosystem services. Copyright © 2017 Elsevier Ltd. All rights reserved.

  14. Effect of Co-Composting Cattle Manure with Construction and Demolition Waste on the Archaeal, Bacterial, and Fungal Microbiota, and on Antimicrobial Resistance Determinants

    PubMed Central

    Holman, Devin B.; Hao, Xiying; Topp, Edward; Yang, Hee Eun; Alexander, Trevor W.

    2016-01-01

    Agricultural operations generate large quantities of manure which must be eliminated in a manner that is consistent with public health guidelines. Meanwhile, construction and demolition waste makes up about 25% of total solid municipal waste. Co-composting of manure with construction and demolition waste offers a potential means to make manure safe for soil amendment and also divert construction and demolition waste from municipal landfills. Therefore, the archaeal, bacterial, and fungal microbiota of two different types of composted cattle manure and one co-composted with construction and demolition waste, were assessed over a 99-day composting period. The microbiota of the three compost mixtures did not differ, but significant changes over time and by sampling depth were observed. Bacillus and Halocella, however, were more relatively abundant in composted manure from cattle fed dried distillers’ grains and solubles. Proteobacteria and Bacteroidetes were enriched at day 0 and Firmicutes at day 99. The fungal genus Kernia was the most relatively abundant overall and was enriched at day 0. The concentration of 12 antimicrobial resistance determinants in the compost mixtures was also determined, and 10 of these determinants decreased significantly from days 0 to 99. The addition of construction and demolition waste did not affect the persistence of antimicrobial resistance genes or community structure of the compost microbiota and therefore co-composting construction and demolition waste with cattle manure offers a safe, viable way to divert this waste from landfills. PMID:27300323

  15. Effect of Co-Composting Cattle Manure with Construction and Demolition Waste on the Archaeal, Bacterial, and Fungal Microbiota, and on Antimicrobial Resistance Determinants.

    PubMed

    Holman, Devin B; Hao, Xiying; Topp, Edward; Yang, Hee Eun; Alexander, Trevor W

    2016-01-01

    Agricultural operations generate large quantities of manure which must be eliminated in a manner that is consistent with public health guidelines. Meanwhile, construction and demolition waste makes up about 25% of total solid municipal waste. Co-composting of manure with construction and demolition waste offers a potential means to make manure safe for soil amendment and also divert construction and demolition waste from municipal landfills. Therefore, the archaeal, bacterial, and fungal microbiota of two different types of composted cattle manure and one co-composted with construction and demolition waste, were assessed over a 99-day composting period. The microbiota of the three compost mixtures did not differ, but significant changes over time and by sampling depth were observed. Bacillus and Halocella, however, were more relatively abundant in composted manure from cattle fed dried distillers' grains and solubles. Proteobacteria and Bacteroidetes were enriched at day 0 and Firmicutes at day 99. The fungal genus Kernia was the most relatively abundant overall and was enriched at day 0. The concentration of 12 antimicrobial resistance determinants in the compost mixtures was also determined, and 10 of these determinants decreased significantly from days 0 to 99. The addition of construction and demolition waste did not affect the persistence of antimicrobial resistance genes or community structure of the compost microbiota and therefore co-composting construction and demolition waste with cattle manure offers a safe, viable way to divert this waste from landfills.

  16. Large-Scale Residential Demolition

    EPA Pesticide Factsheets

    The EPA provides resources for handling residential demolitions or renovations. This includes planning, handling harmful materials, recycling, funding, compliance assistance, good practices and regulations.

  17. Closure Report for Corrective Action Unit 127: Areas 25 and 26 Storage Tanks, Nevada Test Site, Nevada

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NSTec Environmental Restoration

    CAU 127, Areas 25 and 26 Storage Tanks, consists of twelve CASs located in Areas 25 and 26 of the NTS. The closure alternatives included no further action, clean closure, and closure in place with administrative controls. The purpose of this Closure Report is to provide a summary of the completed closure activities, documentation of waste disposal, and analytical data to confirm that the remediation goals were met.

  18. 50 CFR 622.14 - Area closures related to the Deepwater Horizon oil spill.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... Web site: http://sero.nmfs.noaa.gov/deepwater_horizon_oil_spill.htm. (b) Gulf EEZ area closure related... the Gulf EEZ identified in the map shown on the NMFS Web site: http://sero.nmfs.noaa.gov/deepwater... shown on the NMFS Web site: http://sero.nmfs.noaa.gov/deepwater_horizon_oil_spill.htm. ...

  19. Dehomed: the impacts of house demolitions on the well-being of women from the unrecognized Bedouin-Arab villages in the Negev/Israel.

    PubMed

    Gottlieb, Nora; Feder-Bubis, Paula

    2014-09-01

    Thirty-five Bedouin-Arab villages in South Israel are regarded illegal settlements by the state. Consequently, the residents׳ homes are subject to demolition. Based on 12 semi-structured multiple-participant interviews, this paper examines the house demolitions׳ impacts on women, in the context of gendered constructions of social roles and space. It highlights that the marginalized position of Arab-Bedouin women - as women in a patriarchal community, as members of a minority within Israeli society, and as residents of an "invisible" settlement - contributes to the devastating effects of the house demolitions. In particular, the study׳s results show that the house demolitions inflict severe personal and collective trauma, amplified by women׳s primary role as mothers. Paradoxically, the very same role also becomes a source of resilience and political resistance, as women act to defend a sense of home and restore family life in the face of state violence. Copyright © 2014 Elsevier Ltd. All rights reserved.

  20. GIS-based planning system for managing the flow of construction and demolition waste in Brazil.

    PubMed

    Paz, Diogo Henrique Fernandes da; Lafayette, Kalinny Patrícia Vaz; Sobral, Maria do Carmo

    2018-05-01

    The objective of this article was to plan a network for municipal management of construction and demolition waste in Brazil with the assistance of a geographic information system, using the city of Recife as a case study. The methodology was carried out in three stages. The first was to map the illegal construction and demolition of waste disposal points across Recife and classify the waste according to its recyclability. In sequence, a method for indicating suitable areas for installation of voluntary delivery points, for small waste generators, are presented. Finally, a method for indicating suitable areas for the installation of trans-shipment and waste sorting areas, developed for large generators, is presented. The results show that a geographic information system is an essential tool in the planning of municipal construction and demolition waste management, in order to facilitate the spatial analysis and control the generation, sorting, collection, transportation, and final destination of construction and demolition waste, increasing the rate of recovery and recycling of materials.

  1. State Demolition Information

    EPA Pesticide Factsheets

    Contact information and guidances for each state and selected territories's environmental agencies and programs relevant to large-scale residential demolition including asbestos, lead, and open burning.

  2. Final closure plan for the high-explosives open burn treatment facility at Lawrence Livermore National Laboratory Experimental Test Site 300

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Mathews, S.

    This document addresses the interim status closure of the HE Open Bum Treatment Facility, as detailed by Title 22, Division 4.5, Chapter 15, Article 7 of the Califonia Code of Regulations (CCR) and by Title 40, Code of Federal Regulations (CFR) Part 265, Subpart G, ``Closure and Post Closure.`` The Closure Plan (Chapter 1) and the Post- Closure Plan (Chapter 2) address the concept of long-term hazard elimination. The Closure Plan provides for capping and grading the HE Open Bum Treatment Facility and revegetating the immediate area in accordance with applicable requirements. The Closure Plan also reflects careful consideration ofmore » site location and topography, geologic and hydrologic factors, climate, cover characteristics, type and amount of wastes, and the potential for contaminant migration. The Post-Closure Plan is designed to allow LLNL to monitor the movement, if any, of pollutants from the treatment area. In addition, quarterly inspections will ensure that all surfaces of the closed facility, including the cover and diversion ditches, remain in good repair, thus precluding the potential for contaminant migration.« less

  3. Environmental Assessment for Multiple Projects at Laughlin Air Forc Base, TX

    DTIC Science & Technology

    2013-02-06

    Table 5 5 Stormwater Concrete Removal 6 Area Disturbed (acres) Average Removal Depth (ft) Concrete Density (lb/ft 3 ) Concrete Removed (lb...600 feet to the north; and, • Repair and improve stormwater drainage and steep slopes at the Laughlin AFB airfield. Construction would include site...of exposed soils from stormwater runoff, best management practices (BMPs) would be implemented during construction and demolition (C&D). These

  4. Planned secondary wound closure at the circular stapler insertion site after laparoscopic gastric bypass reduces postoperative morbidity, costs, and hospital stay.

    PubMed

    Vetter, Diana; Raptis, Dimitri Aristotle; Giama, Mira; Hosa, Hanna; Muller, Markus K; Nocito, Antonio; Schiesser, Marc; Moos, Rudolf; Bueter, Marco

    2017-12-01

    The aims of the present study were to assess whether planned secondary wound closure at the insertion site of the circular stapler reduces wound infection rate and postoperative morbidity after laparoscopic Roux-en-Y gastric bypass (RYGB) and to identify independent predictive factors increasing the risk for wound infections after RYGB. This paper is a retrospective single-center analysis of a prospectively collected database of 1400 patients undergoing RYGB surgery in circular technique between June 2000 and June 2016. Planned secondary wound closure at the circular stapler introduction site was performed at postoperative day 3 in 291 (20.8%) consecutive patients and compared to a historical control of 1109 (79.2%) consecutive patients with primary wound closure. Independent predictive factors for wound infection were assessed by multivariable analysis. Secondary wound closure significantly decreased wound infection rate from 9.3% (103/1109) to 1% (3/291) (p < 0.001) leading to a shorter hospital stay (mean 9 (SD8) vs. 7 days (SD2), p < 0.001), lower costs (p = 0.039), and reduced postoperative morbidity (mean 90-day Comprehensive Complication Index (CCI) 7.4 (SD14.0) vs. 5.1 (SD11.1) p = 0.008) when compared to primary wound closure. Primary wound closure, dyslipidemia, and preoperative gastritis were independent predictive risk factors for developing wound infections both in the univariate (p < 0.001; p = 0.048; p = 0.003) and multivariable analysis (p < 0.001; p = 0.040; p = 0.012). Further, on multivariable analysis, the female gender was a predictive factor (p = 0.034) for wound infection development. Secondary wound closure at the circular stapler introduction site in laparoscopic RYGB significantly reduces the overall wound infection rate as well as postoperative morbidity, costs, and hospital stay when compared to primary wound closure.

  5. Corrective Action Decision Document/Closure Report for Corrective Action Unit 569: Area 3 Yucca Flat Atmospheric Test Sites Nevada National Security Site, Nevada with ROTC 1, Revision 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sloop, Christy

    2013-04-01

    This Corrective Action Decision Document/Closure Report presents information supporting the closure of Corrective Action Unit (CAU) 569: Area 3 Yucca Flat Atmospheric Test Sites, Nevada National Security Site, Nevada. CAU 569 comprises the following nine corrective action sites (CASs): • 03-23-09, T-3 Contamination Area • 03-23-10, T-3A Contamination Area • 03-23-11, T-3B Contamination Area • 03-23-12, T-3S Contamination Area • 03-23-13, T-3T Contamination Area • 03-23-14, T-3V Contamination Area • 03-23-15, S-3G Contamination Area • 03-23-16, S-3H Contamination Area • 03-23-21, Pike Contamination Area The purpose of this Corrective Action Decision Document/Closure Report is to provide justification and documentation supportingmore » the recommendation that no further corrective action is needed for CAU 569 based on the implementation of the corrective actions listed in Table ES-2.« less

  6. Performance assessment for low-level waste disposal in the UK

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ashworth, A.B.

    1995-12-31

    British Nuclear Fuels plc (BNFL) operate a site for the disposal of Low Level Radioactive Waste at Drigg in West Cumbria, in North-West England. HMIP are responsible for the regulation of the site with regard to environmental discharges of radioactive materials, both operational and post-closure. This paper is concerned with post-closure matters only. Two post-closure performance assessments have been carried out for this site: one by the National Radiological Protection Board (NRPB) in 1987; and a subsequent one carried out on behalf of HMIP, completed in 1991. Currently, BNFL are preparing a Safety Case for continued operation of the Driggmore » site, and it expected that the core of this Case will comprise BNFL`s own analysis of post-closure performance. HMIP has developed procedures for the assessment of this Case, based upon experience of the previous Drigg assessments, and also upon the experience of similar work carried out in the assessment of Intermediate Level Waste (ILW) disposal at both deep and shallow potential sites. This paper describes the more important features of these procedures.« less

  7. New suturing technique for robotic-assisted vaginal cuff closure during single-site hysterectomy.

    PubMed

    Shin, So-Jin; Chung, Hyewon; Kwon, Sang-Hoon; Cha, Soon-Do; Cho, Chi-Heum

    2017-06-01

    To describe a simple and efficient technique for suturing the vaginal cuff in robotic-assisted single-site hysterectomy using barbed suture and a straight needle. Consecutive patients undergoing robotic-assisted single-site hysterectomy from February 2014 to August 2015 at Dong San Hospital, Keimyung University were included. Surgeons used two barbed sutures in a running fashion to close the vaginal cuff. A barbed suture was exclusively used with a straightened needle in upward direction from posterior vaginal cuff to anterior vaginal cuff which played a pivotal role for closure. A total of 100 patients underwent robotic-assisted single-site hysterectomy. The total operation time was 132.5 min and vaginal cuff closure time was 12.0 min. There were no postoperative complications; vaginal cuff dehiscence, vaginal cuff infection, and vaginal bleeding that require surgical intervention or admission. The use of barbed suture with straightened needle to close the vaginal cuff in robotic-assisted single-site hysterectomy is easy to perform and demonstrates safety and efficacy. This technique offers secure, fast, and effective incision closure.

  8. Effect of wastewater treatment facility closure on endocrine disrupting chemicals in a Coastal Plain stream

    USGS Publications Warehouse

    Bradley, Paul M.; Journey, Celeste A.; Clark, Jimmy M.

    2016-01-01

    Wastewater treatment facility (WWTF) closures are rare environmental remediation events; offering unique insight into contaminant persistence, long-term wastewater impacts, and ecosystem recovery processes. The U.S. Geological Survey assessed the fate of select endocrine disrupting chemicals (EDC) in surface water and streambed sediment one year before and one year after closure of a long-term WWTF located within the Spirit Creek watershed at Fort Gordon, Georgia. Sample sites included a WWTF-effluent control located upstream from the outfall, three downstream effluent-impacted sites located between the outfall and Spirit Lake, and one downstream from the lake's outfall. Prior to closure, the 2.2-km stream segment downstream from the WWTF outfall was characterized by EDC concentrations significantly higher (α = 0.05) than at the control site; indicating substantial downstream transport and limited in-stream attenuation of EDC, including pharmaceuticals, estrogens, alkylphenol ethoxylate (APE) metabolites, and organophosphate flame retardants (OPFR). Wastewater-derived pharmaceutical, APE metabolites, and OPFR compounds were also detected in the outflow of Spirit Lake, indicating the potential for EDC transport to aquatic ecosystems downstream of Fort Gordon under effluent discharge conditions. After the WWTF closure, no significant differences in concentrations or numbers of detected EDC compounds were observed between control and downstream locations. The results indicated EDC pseudo-persistence under preclosure, continuous supply conditions, with rapid attenuation following WWTF closure. Low concentrations of EDC at the control site throughout the study and comparable concentrations in downstream locations after WWTF closure indicated additional, continuing, upstream contaminant sources within the Spirit Creek watershed. 

  9. 10 CFR 61.62 - Funding for disposal site closure and stabilization.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... Section 61.62 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSING REQUIREMENTS FOR LAND DISPOSAL OF RADIOACTIVE WASTE Financial Assurances § 61.62 Funding for disposal site closure and stabilization. (a) The... and stabilization, including: (1) Decontamination or dismantlement of land disposal facility...

  10. 10 CFR 61.62 - Funding for disposal site closure and stabilization.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... Section 61.62 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSING REQUIREMENTS FOR LAND DISPOSAL OF RADIOACTIVE WASTE Financial Assurances § 61.62 Funding for disposal site closure and stabilization. (a) The... and stabilization, including: (1) Decontamination or dismantlement of land disposal facility...

  11. 10 CFR 61.62 - Funding for disposal site closure and stabilization.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... Section 61.62 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSING REQUIREMENTS FOR LAND DISPOSAL OF RADIOACTIVE WASTE Financial Assurances § 61.62 Funding for disposal site closure and stabilization. (a) The... and stabilization, including: (1) Decontamination or dismantlement of land disposal facility...

  12. 10 CFR 61.62 - Funding for disposal site closure and stabilization.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Section 61.62 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSING REQUIREMENTS FOR LAND DISPOSAL OF RADIOACTIVE WASTE Financial Assurances § 61.62 Funding for disposal site closure and stabilization. (a) The... and stabilization, including: (1) Decontamination or dismantlement of land disposal facility...

  13. 10 CFR 61.62 - Funding for disposal site closure and stabilization.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... Section 61.62 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSING REQUIREMENTS FOR LAND DISPOSAL OF RADIOACTIVE WASTE Financial Assurances § 61.62 Funding for disposal site closure and stabilization. (a) The... and stabilization, including: (1) Decontamination or dismantlement of land disposal facility...

  14. Disaster Debris Recovery Database - Recovery

    EPA Pesticide Factsheets

    The US EPA Region 5 Disaster Debris Recovery Database includes public datasets of over 6,000 composting facilities, demolition contractors, transfer stations, landfills and recycling facilities for construction and demolition materials, electronics, household hazardous waste, metals, tires, and vehicles in the states of Illinois, Indiana, Iowa, Kentucky, Michigan, Minnesota, Missouri, North Dakota, Ohio, Pennsylvania, South Dakota, West Virginia and Wisconsin.In this update, facilities in the 7 states that border the EPA Region 5 states were added to assist interstate disaster debris management. Also, the datasets for composters, construction and demolition recyclers, demolition contractors, and metals recyclers were verified and source information added for each record using these sources: AGC, Biocycle, BMRA, CDRA, ISRI, NDA, USCC, FEMA Debris Removal Contractor Registry, EPA Facility Registry System, and State and local listings.

  15. Disaster Debris Recovery Database - Landfills

    EPA Pesticide Factsheets

    The US EPA Region 5 Disaster Debris Recovery Database includes public datasets of over 6,000 composting facilities, demolition contractors, transfer stations, landfills and recycling facilities for construction and demolition materials, electronics, household hazardous waste, metals, tires, and vehicles in the states of Illinois, Indiana, Iowa, Kentucky, Michigan, Minnesota, Missouri, North Dakota, Ohio, Pennsylvania, South Dakota, West Virginia and Wisconsin.In this update, facilities in the 7 states that border the EPA Region 5 states were added to assist interstate disaster debris management. Also, the datasets for composters, construction and demolition recyclers, demolition contractors, and metals recyclers were verified and source information added for each record using these sources: AGC, Biocycle, BMRA, CDRA, ISRI, NDA, USCC, FEMA Debris Removal Contractor Registry, EPA Facility Registry System, and State and local listings.

  16. Evaluation of the 183-D Water Filtration Facility for Bat Roosts and Development of a Mitigation Strategy, 100-D Area, Hanford Site

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lindsey, C. T.; Gano, K. A.; Lucas, J. G.

    The 183-D Water Filtration Facility is located in the 100-D Area of the Hanford Site, north of Richland, Washington. It was used to provide filtered water for cooling the 105-D Reactor and supplying fire-protection and drinking water for all facilities in the 100-D Area. The facility has been inactive since the 1980s and is now scheduled for demolition. Therefore, an evaluation was conducted to determine if any part of the facility was being used as roosting habitat by bats.

  17. Closure Report for Corrective Action Unit 568: Area 3 Plutonium Dispersion Sites Nevada National Security Site, Nevada, Revision 1

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Matthews, Patrick

    The purpose of this CR is to provide documentation and justification that no further corrective action is needed for the closure of CAU 568 based on the implementation of corrective actions. This includes a description of closure activities that were performed and an evaluation of the verification data. The CAP (NNSA/NFO, 2016a) and ROTC-1 (NNSA/NFO, 2016c) provide information relating to the selection of CAAs and the reasoning behind their selection. The CADD (NNSA/NFO, 2015) identifies the release sites that require additional corrective action and presents information supporting the selection of CAAs.

  18. Ecological Data in Support of the Tank Closure and Waste Management Environmental Impact Statement. Part 2: Results of Spring 2007 Field Surveys

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sackschewsky, Michael R.; Downs, Janelle L.

    2007-05-31

    This review provides an evaluation of potential impacts of actions that have been proposed under various alternatives to support the closure of the high level waste tanks on the Hanford Site. This review provides a summary of data collected in the field during the spring of 2007 at all of the proposed project sites within 200 East and 200 West Areas, and at sites not previously surveyed. The primary purpose of this review is to provide biological data that can be incorporated into or used to support the Tank Closure and Waste Management Environmental Impact Statement.

  19. Challenges in automatic sorting of construction and demolition waste by hyperspectral imaging

    NASA Astrophysics Data System (ADS)

    Hollstein, Frank; Cacho, Íñigo; Arnaiz, Sixto; Wohllebe, Markus

    2016-05-01

    EU-28 countries currently generate 460 Mt/year of construction and demolition waste (C&DW) and the generation rate is expected to reach around 570 Mt/year between 2025 and 2030. There is great potential for recycling C&DW materials since they are massively produced and content valuable resources. But new C&DW is more complex than existing one and there is a need for shifting from traditional recycling approaches to novel recycling solutions. One basic step to achieve this objective is an improvement in (automatic) sorting technology. Hyperspectral Imaging is a promising candidate to support the process. However, the industrial distribution of Hyperspectral Imaging in the C&DW recycling branch is currently insufficiently pronounced due to high investment costs, still insufficient robustness of optical sensor hardware in harsh ambient conditions and, because of the need of sensor fusion, not well-engineered special software methods to perform the (on line) sorting tasks. Thereby frame rates of over 300 Hz are needed for a successful sorting result. Currently the biggest challenges with regard to C&DW detection cover the need of overlapping VIS, NIR and SWIR hyperspectral images in time and space, in particular for selective recognition of contaminated particles. In the study on hand a new approach for hyperspectral imagers is presented by exploiting SWIR hyperspectral information in real time (with 300 Hz). The contribution describes both laboratory results with regard to optical detection of the most important C&DW material composites as well as a development path for an industrial implementation in automatic sorting and separation lines. The main focus is placed on the closure of the two recycling circuits "grey to grey" and "red to red" because of their outstanding potential for sustainability in conservation of construction resources.

  20. 2010 River Corridor Closure Contractor Revegetation and Mitigation Monitoring Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    C. T. Lindsey, A. L. Johnson

    2010-09-30

    This report documents eh status of revegetation projects and natural resources mitigation efforts conducted for remediated waste sites and other activities associated with CERLA cleanup of National Priorities List waste sites at Hanford. This report contains vegetation monitoring data that were collected in the spring and summer of 2010 from the River Corridor Closure Contract’s revegetation and mitigation areas on the Hanford Site.

  1. 76 FR 4373 - Notice of Temporary Closure of Caves With Significant Bat Resources on Public Lands in New Mexico

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-25

    ... Temporary Closure of Caves With Significant Bat Resources on Public Lands in New Mexico AGENCY: Bureau of... temporary closure of caves and abandoned mines (sites) with significant bat resources is in effect on public... bat populations from white- nosed syndrome. DATES: This closure will be in effect from January 25...

  2. Permanent Closure of MFC Biodiesel Underground Storage Tank 99ANL00013

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kerry L. Nisson

    2012-10-01

    This closure package documents the site assessment and permanent closure of the Materials and Fuels Complex biodiesel underground storage tank 99ANL00013 in accordance with the regulatory requirements established in 40 CFR 280.71, “Technical Standards and Corrective Action Requirements for Owners and Operators of Underground Storage Tanks: Out-of-Service UST Systems and Closure.”

  3. Closure Report for Corrective Action Unit 118: Area 27 Super Kukla Facility, Nevada Test Site, Nevada with ROTC 1, Revision 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Mark Burmeister

    2007-09-01

    This CR provides documentation and justification for the closure of CAU 118 without further corrective action. This justification is based on process knowledge and the results of the investigative and closure activities conducted in accordance with the CAU 118 SAFER Plan: Streamlined Approach for Environmental Restoration (SAFER) Plan for CAU 118: Area 27 Super Kukla Facility, Nevada Test Site, Nevada (NNSA/NSO, 2006). The SAFER Plan provides information relating to site history as well as the scope and planning of the investigation. This CR also provides the analytical and radiological survey data to confirm that the remediation goals were met asmore » specified in the CAU 118 SAFER Plan (NNSA/NSO, 2006). The Nevada Division of Environmental Protection (NDEP) approved the CAU 118 SAFER Plan (Murphy, 2006), which recommends closure in place with use restrictions (URs).« less

  4. DETERMINATION OF OPTIMAL TOXICANT LOADING FOR BIOLOGICAL CLOSURE OF A HAZARDOUS WASTE SITE

    EPA Science Inventory

    Information on Phase I and Phase Il of a multitask effort to achieve biological closure of an abandoned hazardous waste site. aste materials, in the form of buried sludges and lagoon wastes, were examined. ptimal loading levels were evaluated on the basis of biodegradative potent...

  5. “We Need to Have a Meeting”: Public Housing Demolition and Collective Agency in Atlanta, Georgia

    PubMed Central

    Keene, Danya E.

    2017-01-01

    The last two decades have witnessed widespread demolition of public housing and a large-scale relocation of public housing residents. Much of the current literature has examined the impact of demolition on relocated residents, focusing primarily on individual outcomes such as employment, housing quality, and health. This article examines the potential collective consequences of relocation by using data from 40 in-depth interviews conducted with relocated public housing residents in Atlanta, Georgia, to examine experiences of civic engagement and tenant activism before and after relocation. Participants describe frequent experiences of civic engagement and tenant activism in their public housing communities prior to demolition and also discuss how these collective actions often translated into meaningful gains for their communities. Participants also describe challenges associated with reestablishing these sources of collective agency in their new, post demolition, private-market rental communities where opportunities for civic engagement and tenant activism were perceived to be limited, where stigma was a barrier to social interaction, and where they experienced significant residential instability. PMID:29321697

  6. CENTRAL PLATEAU REMEDIATION

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    ROMINE, L.D.

    2006-02-01

    A systematic approach to closure planning is being implemented at the Hanford Site's Central Plateau to help achieve the goal of closure by the year 2035. The overall objective of Central Plateau remediation is to protect human health and the environment from the significant quantity of contaminated material that resulted from decades of plutonium production in support of the nation's defense. This goal will be achieved either by removing contaminants or placing the residual contaminated materials in a secure configuration that minimizes further migration to the groundwater and reduces the potential for inadvertent intrusion into contaminated sites. The approach tomore » Central Plateau cleanup used three key concepts--closure zones, closure elements, and closure process steps--to create an organized picture of actions required to complete remediation. These actions were merged with logic ties, constraints, and required resources to produce an integrated time-phased schedule and cost profile for Central Plateau closure. Programmatic risks associated with implementation of Central Plateau closure were identified and analyzed. Actions to mitigate the most significant risks are underway while high priority remediation projects continue to make progress.« less

  7. Vascular closure devices in stroke patients receiving tissue plasminogen activator: A retrospective analysis from an academic tertiary medical center and a teaching community hospital stroke database.

    PubMed

    Patil, Mangaladevi S; Jayaraman, Mahesh V; Ahn, Sun H

    2017-06-01

    To determine the safety and effectiveness of vascular closure devices in prevention of access site complications in acute stroke patient receiving intravenous (IV) and/or intra-arterial (IA) IV tissue plasminogen activator (tPA). All patients with acute stroke onset treated with IV and/or IA tPA closed with vascular closure device and adult age (>18 years) were identified from an academic tertiary medical center and a teaching community hospital stroke database for 9 years (from March 2005 to June 2014). A total of 69 patients were included in the study. The mean age was 68.86±16.70 years and 49.2% female. All accesses were under fluoroscopic guidance into the right common femoral artery. We observed a 5.8% complication rate in patients receiving IV and/or IA tPA closed with vascular closure device. Access site complications included 3 cases of hematoma and 1 case of residual oozing. One patient required transfusion due to access site hematoma. Three patients were on aspirin and heparin and 1 was on no prior anticoagulation. Vascular closure device access site hemorrhagic complication rate in those receiving IV and/or IA tPA is low and similar to reported rates in those not receiving thrombolytic therapy. Vascular closure device use in patients receiving thrombolytic therapy is safe and effectively achieves hemostasis. Copyright © 2017 Elsevier B.V. All rights reserved.

  8. DEMONSTRATION REPORT: Demonstration of Advanced Geophysics and Classification Technologies on Munitions Response Sites Former Fort Ord, Monterey County, CA

    DTIC Science & Technology

    2017-06-01

    DGM Digital Geophysical Mapping DTSC California Department of Toxic Substances Control EM Electromagnetic EPA U.S. Environmental...land mines, pyrotechnics, bombs , and demolition materials. Surface sweeps identified MEC items throughout Units 11 and 12, including 37mm, 40mm, 57mm...electromagnetic ( EM ) data are being collected. If no GPS readings are collected during that period, the most recent GPS position and the platform

  9. Field Demonstration and Validation of TREECS and CTS for the Risk Assessment of Contaminants on Department of Defense Ranges

    DTIC Science & Technology

    2017-06-01

    Chemical Transformation Simulator (CTS) was developed by the U.S. Environmental Protection Agency to provide physicochemical properties of complex...Site Model CTS Chemical Transformation Simulator developed by EPA D4EM Data for Environmental Modeling Demo Demolition area DNAN 2,4...U.S. Environmental Protection Agency (EPA), was the technical point-of-contact for the Contaminant Transformation Simulator (CTS) that was

  10. Closure Report for Corrective Action Unit 465: Hydronuclear Nevada National Security Site, Nevada, Revision 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Mark Burmeister and Patrick Matthews

    2012-11-01

    The corrective action sites (CASs) within CAU 465 are located within Areas 6 and 27 of the NNSS. CAU 465 comprises the following CASs: • 00-23-01, Hydronuclear Experiment, located in Area 27 of the NNSS and known as the Charlie site. • 00-23-02, Hydronuclear Experiment, located in Area 27 of the NNSS and known as the Dog site. • 00-23-03, Hydronuclear Experiment, located in Area 27 of the NNSS and known as the Charlie Prime and Anja sites. • 06-99-01, Hydronuclear, located in Area 6 of the NNSS and known as the Trailer 13 site. The purpose of this CRmore » is to provide documentation supporting the completed corrective actions and provide data confirming that the closure objectives for CASs within CAU 465 were met. From September 2011 through July 2012, closure activities were performed as set forth in the Streamlined Approach for Environmental Restoration Plan for CAU 465: Hydronuclear, Nevada National Security Site, Nevada.« less

  11. Rationale and design of a randomised clinical trial comparing vascular closure device and manual compression to achieve haemostasis after diagnostic coronary angiography: the Instrumental Sealing of ARterial puncture site - CLOSURE device versus manual compression (ISAR-CLOSURE) trial.

    PubMed

    Xhepa, Erion; Byrne, Robert A; Schulz, Stefanie; Helde, Sandra; Gewalt, Senta; Cassese, Salvatore; Linhardt, Maryam; Ibrahim, Tareq; Mehilli, Julinda; Hoppe, Katharina; Grupp, Katharina; Kufner, Sebastian; Böttiger, Corinna; Hoppmann, Petra; Burgdorf, Christof; Fusaro, Massimiliano; Ott, Ilka; Schneider, Simon; Hengstenberg, Christian; Schunkert, Heribert; Laugwitz, Karl-Ludwig; Kastrati, Adnan

    2014-06-01

    Vascular closure devices (VCD) have been introduced into clinical practice with the aim of increasing the procedural efficiency and clinical safety of coronary angiography. However, clinical studies comparing VCD and manual compression have yielded mixed results, and large randomised clinical trials comparing the two strategies are missing. Moreover, comparative efficacy studies between different VCD in routine clinical use are lacking. The Instrumental Sealing of ARterial puncture site - CLOSURE device versus manual compression (ISAR-CLOSURE) trial is a prospective, randomised clinical trial designed to compare the outcomes associated with the use of VCD or manual compression to achieve femoral haemostasis. The test hypothesis is that femoral haemostasis after coronary angiography achieved using VCD is not inferior to manual compression in terms of access-site-related vascular complications. Patients undergoing coronary angiography via the common femoral artery will be randomised in a 1:1:1 fashion to receive FemoSeal VCD, EXOSEAL VCD or manual compression. The primary endpoint is the incidence of the composite of arterial access-related complications (haematoma ≥5 cm, pseudoaneurysm, arteriovenous fistula, access-site-related bleeding, acute ipsilateral leg ischaemia, the need for vascular surgical/interventional treatment or documented local infection) at 30 days after randomisation. According to power calculations based on non-inferiority hypothesis testing, enrolment of 4,500 patients is planned. The trial is registered at www.clinicaltrials.gov (study identifier: NCT01389375). The safety of VCD as compared to manual compression in patients undergoing transfemoral coronary angiography remains an issue of clinical equipoise. The aim of the ISAR-CLOSURE trial is to assess whether femoral haemostasis achieved through the use of VCD is non-inferior to manual compression in terms of access-site-related vascular complications.

  12. Prospective Comparison of Collagen Plug (Angio-Seal™) and Suture-Mediated (the Closer S™) Closure Devices at Femoral Access Sites

    PubMed Central

    Park, Yulri; Choo, Sung Wook; Lee, Sung Hoon; Shin, Sung Wook; Do, Young Soo; Byun, Hong Sik; Park, Kwang Bo; Jeon, Pyoung

    2005-01-01

    Objective Rapid and effective hemostasis at femoral puncture sites minimizes both the hospital stay and patient discomfort. Therefore, a variety of arterial closure devices have been developed to facilitate the closure of femoral arteriotomy. The objective of this prospective study was to compare the efficacy of two different closure devices; a collagen plug device (Angio-Seal) and a suture-mediated closure device (the Closer S). Materials and Methods From March 28, 2003 to August 31, 2004, we conducted a prospective study in which 1,676 cases of 1,180 patients were treated with two different types of closure device. Angio-Seal was used in 961 cases and the Closer S in 715 cases. The efficacy of the closure devices was assessed, as well as complications occurring at the puncture sites. Results Successful immediate hemostasis was achieved in 95.2% of the cases treated with Angio-Seal, and in 89.5% of the cases treated with the Closer S (p < 0.05). The rates of minor and major complications occurring between the two groups were not significantly different. In the Closer S group, we observed four major complications (0.6%), that consisted of one massive retroperitoneal hemorrhage (surgically explored) and three pseudoaneurysms. In the Angio-Seal group, we observed three major complications (0.3%) that consisted of one femoral artery occlusion, one case of infection treated with intravenous antibiotics and one pseudoaneurysm. Conclusion The use of Angio-Seal was found to be more effective than that of the Closer S with regard to the immediate hemostasis of the femoral puncture sites. However, we detected no significant differences in the rate at which complications occurred. PMID:16374083

  13. Negative pressure wound therapy combined with acoustic pressure wound therapy for infected post surgery wounds: a case series.

    PubMed

    Howell-Taylor, Melania; Hall, Macy G; Brownlee Iii, William J; Taylor, Mary

    2008-09-01

    Acute infection of surgical incision sites often requires specialized wound care in preparation for surgical closure. Optimal therapy for preparing such wounds for a secondary closure procedure remains uncertain. The authors report wound outcomes after administering acoustic pressure wound therapy in conjunction with negative pressure wound therapy with reticulated open-cell foam dressing changes to assist with bacteria removal from open, infected surgical-incision sites in preparation for secondary surgical closure in three patients. Before incorporating acoustic pressure wound therapy at the authors' facility, the average negative pressure wound therapy with reticulated open-cell foam dressing course prior to secondary surgical closure was 30 days; with its addition, two of three patients underwent successful surgical closure with no postoperative complications after 21 and 14 days, respectively; one patient succumbed to nonwound-related complications before wound closure. Larger, prospective studies are needed to evaluate combining negative pressure wound therapy with reticulated open-cell foam dressing and acoustic pressure wound therapy for infected, acute post surgery wounds.

  14. Closing Rocky Flats by 2006

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Tuor, N. R.; Schubert, A. L.

    2002-02-26

    Safely accelerating the closure of Rocky Flats to 2006 is a goal shared by many: the State of Colorado, the communities surrounding the site, the U.S. Congress, the Department of Energy, Kaiser-Hill and its team of subcontractors, the site's employees, and taxpayers across the country. On June 30, 2000, Kaiser-Hill (KH) submitted to the Department of Energy (DOE), KH's plan to achieve closure of Rocky Flats by December 15, 2006, for a remaining cost of $3.96 billion (February 1, 2000, to December 15, 2006). The Closure Project Baseline (CPB) is the detailed project plan for accomplishing this ambitious closure goal.more » This paper will provide a status report on the progress being made toward the closure goal. This paper will: provide a summary of the closure contract completion criteria; give the current cost and schedule variance of the project and the status of key activities; detail important accomplishments of the past year; and discuss the challenges ahead.« less

  15. Household Hazardous Waste and Demolition

    EPA Pesticide Factsheets

    Household wastes that are toxic, corrosive, ignitable, or reactive are known as Household Hazardous Waste (HHW). Household Hazardous Waste may be found during residential demolitions, and thus require special handling for disposal.

  16. Closure Report for Corrective Action Unit 573: Alpha Contaminated Sites Nevada National Security Site, Nevada

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Matthews, Patrick

    This Closure Report (CR) presents information supporting the closure of Corrective Action Unit (CAU) 573: Alpha Contaminated Sites, Nevada National Security Site, Nevada. CAU 573 comprises the two corrective action sites (CASs): 05-23-02-GMX Alpha Contaminated Are-Closure in Place and 05-45-01-Atmospheric Test Site - Hamilton- Clean Closure. The purpose of this CR is to provide justification and documentation supporting the recommendation that no further corrective action is needed for CAU 573 based on the implementation of the corrective actions. Corrective action activities were performed at Hamilton from May 25 through June 30, 2016; and at GMX from May 25 to Octobermore » 27, 2016, as set forth in the Corrective Action Decision Document (CADD)/Corrective Action Plan (CAP) for Corrective Action Unit 573: Alpha Contaminated Sites; and in accordance with the Soils Activity Quality Assurance Plan, which establishes requirements, technical planning, and general quality practices. Verification sample results were evaluated against data quality objective criteria developed by stakeholders that included representatives from the Nevada Division of Environmental Protection and the DOE, National Nuclear Security Administration Nevada Field Office (NNSA/NFO) during the corrective action alternative (CAA) meeting held on November 24, 2015. Radiological doses exceeding the final action level were assumed to be present within the high contamination areas associated with CAS 05-23-02, thus requiring corrective action. It was also assumed that radionuclides were present at levels that require corrective action within the soil/debris pile associated with CAS 05-45-01. During the CAU 573 CAA meeting, the CAA of closure in place with a use restriction (UR) was selected by the stakeholders as the preferred corrective action of the high contamination areas at CAS 05-23-02 (GMX), which contain high levels of removable contamination; and the CAA of clean closure was selected by the stakeholders as preferred corrective action for the debris pile at CAS 05-45-01 (Hamilton). The closure in place was accomplished by posting signs containing a warning label on the existing contamination area fence line; and recording the FFACO UR and administrative UR in the FFACO database, the NNSA/NFO CAU/CAS files, and the management and operating contractor Geographic Information Systems. The clean closure was accomplished by excavating the soil/debris pile, disposing of the contents at the Area 5 Radioactive Waste Management Complex, and collecting verification samples. The corrective actions were implemented as stipulated in the CADD/CAP, and verification sample results confirm that the criteria for the completion of corrective actions have been met. Based on the implementation of these corrective actions, NNSA/NFO provides the following recommendations: No further corrective actions are necessary for CAU 573; The Nevada Division of Environmental Protection should issue a Notice of Completion to NNSA/NFO for closure of CAU 573; CAU 573 should be moved from Appendix III to Appendix IV of the FFACO.« less

  17. Use of Aqueous Foam to Mitigate Demolitions Noise

    DTIC Science & Technology

    1981-12-01

    Training Nobe. From Rangei"liboratory too USE OF AQUEOUS FOAM TO MITIGATE DEMOLITIONS NOISE LEYVEL S• • , ELECTE by Richard Rapet INM Approved for public...Subtitle) S. TYPE OF REPORT A PERIOD CovERED Use of Aqueous Foam to Mitigate Demolitions Noise FINAL -6 PERf,’RMING ORO. REPORT NUMSER 7. AUTHOR(a) S...1noise reduction * ; foam i 20. A"iTn ACT 001 mi, mm OI* N n-*-my Old 01idmiup by block misw) This report describes an investigation into whether aqueous

  18. Approval of System MANPRINT Management Plan (SMMP) for the Modernized Demolitions Initiators (MDI) Set

    DTIC Science & Technology

    1990-07-01

    at the different skill levels are: C-1 a. MOSC 12B10. Assists combat engineers by performing combat construction, combat demolitions, and related...duties. b. MOSC 12B20. Performs as team leader and assistant squad leader in combat construction, demolition, and duties. c. MOSC 12B30. Serves as squad...instructor. d. MOSC 12B40. Serves as platoon sergeant; as operations sergeant; as construction inspector; as advisor to supported units, allied forces

  19. 10 CFR 61.28 - Contents of application for closure.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSING REQUIREMENTS FOR LAND DISPOSAL OF RADIOACTIVE WASTE Licenses § 61.28 Contents of application for closure. (a) Prior to final closure of the disposal... site data pertinent to the long-term containment of emplaced radioactive wastes obtained during the...

  20. 10 CFR 61.28 - Contents of application for closure.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSING REQUIREMENTS FOR LAND DISPOSAL OF RADIOACTIVE WASTE Licenses § 61.28 Contents of application for closure. (a) Prior to final closure of the disposal... site data pertinent to the long-term containment of emplaced radioactive wastes obtained during the...

  1. 10 CFR 61.28 - Contents of application for closure.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSING REQUIREMENTS FOR LAND DISPOSAL OF RADIOACTIVE WASTE Licenses § 61.28 Contents of application for closure. (a) Prior to final closure of the disposal... site data pertinent to the long-term containment of emplaced radioactive wastes obtained during the...

  2. 10 CFR 61.28 - Contents of application for closure.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSING REQUIREMENTS FOR LAND DISPOSAL OF RADIOACTIVE WASTE Licenses § 61.28 Contents of application for closure. (a) Prior to final closure of the disposal... site data pertinent to the long-term containment of emplaced radioactive wastes obtained during the...

  3. 10 CFR 61.28 - Contents of application for closure.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSING REQUIREMENTS FOR LAND DISPOSAL OF RADIOACTIVE WASTE Licenses § 61.28 Contents of application for closure. (a) Prior to final closure of the disposal... site data pertinent to the long-term containment of emplaced radioactive wastes obtained during the...

  4. Distally based sural neuro-fasciocutaneous perforator flap for foot and ankle reconstruction: Surgical modifications for flap pedicle and donor site closure without skin graft.

    PubMed

    Chi, Zhenglin; Chen, Yiheng; Chu, Tinggang; Gao, Weiyang; Li, Zhijie; Yan, Hede; Song, Yonghuan

    2018-02-01

    The conventional procedure of the sural neuro-fasciocutaneous flap enables the supply of blood and venous drainage by increasing the width of the adipofascial tissue and preserving tiny venous return routes. Moreover, skin graft is a common method for donor site closure, which may lead to some complications and influence the aesthetic appearance. We report modifications for a distally based sural neuro-fasciocutaneous perforator flap and a relaying flap for donor site closure without skin graft. Twelve patients undergoing the modified flap for foot and ankle reconstruction were included in this study between 2014 and 2016. A peroneal-based perforator, a superficial vein, and the vascular axis of the sural nerve were included in the pedicle. A Z-shape skin incision was performed to explore the perforator vessels and a relaying island perforator flap was used to close the donor site. All flaps survived completely without necrosis. The area of the flaps ranged from 16 × 8 cm to 30 × 15 cm. The diameter width of the pedicle ranged from 1.0 to 2.0 cm. A relaying perforator island flap was used in 10 cases for donor site closure and no skin graft was performed. There were no serious donor site complications. All patients were satisfied with the aesthetic outcome postoperatively at the final follow-up. The distally based sural neuro-fasciocutaneous perforator flap is considered a reliable method for foot and ankle reconstruction. The modification for flap pedicle and donor site closure method without skin graft should be recommended. Copyright © 2017. Published by Elsevier Ltd.

  5. Deep inferior epigastric artery perforator flap donor-site closure with cannula-assisted, limited undermining, and progressive high-tension sutures versus standard abdominoplasty: complications, sensitivity, and cosmetic outcomes.

    PubMed

    Visconti, Giuseppe; Tomaselli, Federica; Monda, Anna; Barone-Adesi, Liliana; Salgarello, Marzia

    2015-01-01

    In deep inferior epigastric artery perforator (DIEP) flap breast reconstruction, abdominal donor-site cosmetic and sensibility outcomes and the closure technique have drawn little attention in the literature, with many surgeons still following the principles of standard abdominoplasty. In this article, the authors report their experience with the cannula-assisted, limited undermining, and progressive high-tension suture ("CALP") technique of DIEP donor-site closure compared with standard abdominoplasty. Between December of 2008 and January of 2013, 137 consecutive women underwent DIEP flap breast reconstruction. Of these, 82 patients (between December of 2008 and November of 2011) underwent DIEP flap donor-site closure by means of standard abdominoplasty (control group) and 55 patients (from December of 2011 to January of 2013) by means of cannula-assisted, limited undermining, and progressive high-tension suture (study group). The abdominal drainage daily output, donor-site complications, abdominal skin sensitivity at 1-year follow-up, cosmetic outcomes, and patient satisfaction were recorded and analyzed statistically. Daily drainage output was significantly lower in the study group. Donor-site complications were significantly higher in the control group (37.8 percent versus 9 percent). Seroma and wound healing problems were experienced in the control group. Abdominal skin sensibility was better preserved in the study group. Overall, abdominal wall aesthetic outcomes were similar in both groups, except for scar quality (better in the study group). According to the authors' experience, cannula-assisted, limited undermining, and progressive high-tension suture should be always preferred to standard abdominoplasty for DIEP donor-site closure to reduce the complication rate to improve abdominal skin sensitivity and scar quality. Therapeutic, II.

  6. Mercury-Containing Devices and Demolition

    EPA Pesticide Factsheets

    Some items inside residential buildings contain mercury, which poses a persistent and toxic human health and environmental threat. These materials should be carefully salvaged for proper recycling to prevent mercury contamination prior to demolition.

  7. 40 CFR 280.72 - Assessing the site at closure or change-in-service.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 26 2010-07-01 2010-07-01 false Assessing the site at closure or change-in-service. 280.72 Section 280.72 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY... indicates no release has occurred. (b) If contaminated soils, contaminated ground water, or free product as...

  8. Environmental scan of infection prevention and control practices for containment of hospital-acquired infectious disease outbreaks in acute care hospital settings across Canada.

    PubMed

    Ocampo, Wrechelle; Geransar, Rose; Clayden, Nancy; Jones, Jessica; de Grood, Jill; Joffe, Mark; Taylor, Geoffrey; Missaghi, Bayan; Pearce, Craig; Ghali, William; Conly, John

    2017-10-01

    Ward closure is a method of controlling hospital-acquired infectious diseases outbreaks and is often coupled with other practices. However, the value and efficacy of ward closures remains uncertain. To understand the current practices and perceptions with respect to ward closure for hospital-acquired infectious disease outbreaks in acute care hospital settings across Canada. A Web-based environmental scan survey was developed by a team of infection prevention and control (IPC) experts and distributed to 235 IPC professionals at acute care sites across Canada. Data were analyzed using a mixed-methods approach of descriptive statistics and thematic analysis. A total of 110 completed responses showed that 70% of sites reported at least 1 outbreak during 2013, 44% of these sites reported the use of ward closure. Ward closure was considered an "appropriate," "sometimes appropriate," or "not appropriate" strategy to control outbreaks by 50%, 45%, and 5% of participants, respectively. System capacity issues and overall risk assessment were main factors influencing the decision to close hospital wards following an outbreak. Results suggest the use of ward closure for containment of hospital-acquired infectious disease outbreaks in Canadian acute care health settings is mixed, with outbreak control methods varying. The successful implementation of ward closure was dependent on overall support for the IPC team within hospital administration. Copyright © 2017 Association for Professionals in Infection Control and Epidemiology, Inc. Published by Elsevier Inc. All rights reserved.

  9. Closure plan for Corrective Action Unit 109: U-2bu subsidence crater, Nevada Test Site, Nevada

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1999-03-01

    The U-2bu subsidence crater, Corrective Action Unit 109, will be closed in accordance with the Resource Conservation and Recovery Act, the Nevada Division of Environmental Protection operational permit, and the Federal Facility Agreement and Consent Order. The U-2bu subsidence crater is located in Area 2 of the Nevada Test Site. It was created in 1971 by an underground nuclear test with the name Miniata. The crater has a diameter of 288 meters (944 feet) and an approximate depth of 35 meters (115 feet). Based on the results of the analyses reported in the site characterization report, the only constituents ofmore » concern in the U-2bu subsidence crater include leachable lead and total petroleum hydrocarbons. Closure activities will include the excavation and disposal of impacted soil from the top of the crater. Upon completion of excavation, verification samples will be collected to show that the leachable lead has been removed to concentrations below the regulatory action level. After sample results show that the lead has been removed, the excavated area will be backfilled and a soil flood diversion berm will be constructed as a best management practice. An independent registered professional engineer will certify the site was closed following the approved Closure Plan. Post-closure care is not warranted for this site because closure activities will involve removal of the Resource Conservation and Recovery Act constituents of concern.« less

  10. The Walls Come Tumbling Down: Decontamination and Demolition of 29 Manhattan Project and Cold War-Era Buildings and Structures at Los Alamos National Laboratory-12301

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Chaloupka, Allan B.; Finn, Kevin P.; Parsons, Duane A.

    2012-07-01

    When the nation's top scientists and military leaders converged on Los Alamos, New Mexico in the 1943, to work on the Manhattan Project, the facilities they used to conduct their top-secret work were quickly constructed and located in the middle of what eventually became the Los Alamos town site. After one of these early facilities caught on fire, it seemed wise to build labs and production facilities farther away from the homes of the town's residents. They chose to build facilities on what was then known as Delta Prime (DP) Mesa and called it Technical Area 21, or TA-21. Withmore » wartime urgency, a number of buildings were built at TA-21, some in as little as a few months. Before long, DP Mesa was populated with several nondescript metal and cinder-block buildings, including what became, immediately following the war, the world's first plutonium production facility. TA-21 also housed labs that used hazardous chemicals and analyzed americium, tritium and plutonium. TA-21 was a bustling center of research and production for the next several decades. Additional buildings were built there in the 1960's, but by the 1990's many of them had reached the end of their service lives. Labs and offices were moved to newer, more modern buildings. When Los Alamos National Laboratory received $212 million in funding from the American Recovery and Reinvestment Act in July 2009 for environmental cleanup projects, about $73 million of the funds were earmarked to decontaminate and demolish 21 of the old buildings at TA-21. Although some D and D of TA-21 buildings was performed in the 1990's, many of the facilities at DP Site remained relatively untouched for nearly three decades following their final operational use. In 2006, there were over three dozen buildings or structures on the mesa to be removed so that soil cleanup could be completed (and the land made available for transfer and reuse). The total footprint of buildings across the mesa was approximately 18,580 m{sup 2} (200,000 ft{sup 2}). The initially approved baseline for the ARRA D and D Project was to remove 22 buildings and structures that included approximately 14,680 m{sup 2} (158,000 ft{sup 2}) of footprint. By employing efficiencies during subcontracting, demolition, and waste segregation, the savings allowed an additional 1,580 m{sup 2} (17,000 ft{sup 2}) of footprint to be removed using ARRA funds. Additionally, the lessons learned from this experience were used to apply NNSA funding to the removal of six additional non-contaminated buildings and structures. In the end, 29 buildings and structures, including stacks, cooling towers and tanks, were removed from the mesa. The entire DP East area was cleared of buildings and sub-grade structures and the soils cleaned to residential standards. The total footprint reduction at TA-21 as a result of this effort was in excess of 17,650 m{sup 2} (190,000 ft{sup 2}). The use of a Laboratory self-performance team to start demolition of non-contaminated structures resulted in steady work performance early in the project while subcontracts were being put in place to perform more complicated abatement and contaminated demolition activities. Most importantly, there were no serious worker injuries and the minor injuries recorded were those common to construction type activities. Extensive monitoring along the site boundary demonstrated that no hazardous chemicals or radioactive contamination were released and radiological dose to the public was negligible. The ARRA demolition activities were completed six months in advance of the deadline for employing ARRA funds. Additionally, over 17,585 m{sup 3} (23,000 yds{sup 3}) of building demolition debris was safely removed from DP Mesa. All of the major buildings have been removed, unencumbered access to the SWMUs that are required to be cleaned up by the Consent Order with the state of New Mexico, has been achieved, and a significant portion of the mesa has been prepared to support a process that will eventually transfer this land from federal government control for further use. (authors)« less

  11. Progressively safer, cheaper demolition of Fernald

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Robert Nichols; Norman Pennington

    2000-09-29

    Fluor Fernald, Inc. has been progressively improving Decontamination and Dismantlement (D&D) at the Department of Energy's Fernald Environmental Management Project by applying new technologies and better methodologies to the work. Demolition issues existed in the past that necessitated new or improved solutions to maintain worker safety, protect the environment and accomplish the work in a cost effective manner. Lessons learned from D&D of 80 structures has led to a systematic approach, which can be implemented in various D&D arenas. When facility production was halted, hold-up material and process residues remained in the process piping and components. Over 500,000 pounds ofmore » material was removed by workers who completed the tasks two years ahead of schedule, $7 million under budget and with an excellent safety record. This success was the result of detailed planning and irdision of lessons learned as work progressed from facility to facility. Work sequences were developed that reduced airborne contamination. Demolition of structures has been performed at Fernald by carefully selected and qualified subcontractors. Asbestos and lead abatement, equipment, piping and conduit removal, and structural demolition have been completed to progressively higher performance specifications developed by Fluor Fernald based on lessons learned during execution. Safety continues to be the primary consideration in performing potentially hazardous work. Technologies such as hydraulic shears have been developed and used to keep workers away from danger. A new technology, ''Cool Suits,'' has been demonstrated to help prevent heat stress when anti-contamination clothing is required in elevated temperature working conditions. For tall structures, implosion technologies have been employed with progressively improved results, Several other new technologies have been evaluated by Fluor Fernald and applied by subcontractors. The improved technologies included the oxy-gas torch, which uses gasoline instead of acetylene gas, and a vacuum system for asbestos removal of wall insulation. These new methods proved effective and beneficial. Fluor Fernald has integrated demolition activities with waste disposal requirements to enhance overall efficiency. The relatively straight steel configurations required for recycling, and waste acceptance criteria that dictate waste sizes are typically included in the subcontract specifications The progressive improvements by Fluor Fernald have led to cost savings and schedule acceleration without increased risk to workers or the environment. When Fluor Fernald came to the site in 1992, the remediation baseline reflected a completion schedule of 2020 and a cost of $7.2 billion. The current projection is 2008 and $4.2 billion.« less

  12. 36 CFR 72.41 - Demolition and replacement of existing recreation properties.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... SERVICE, DEPARTMENT OF THE INTERIOR URBAN PARK AND RECREATION RECOVERY ACT OF 1978 Grants for Recovery Action Program Development, Rehabilitation and Innovation § 72.41 Demolition and replacement of existing...

  13. Pre-Demolition Planning

    EPA Pesticide Factsheets

    Developing a systematic approach to demolition can help manage liability, control, and costs. Careful planning can minimize the release of toxic chemicals and other harmful substances into the environment, and protect the health of workers and the public.

  14. Discovery of Asbestos After Demolition is Underway

    EPA Pesticide Factsheets

    Asbestos National Emissions Standard for Hazardous Air Pollutants Applicability Determination about additional friable asbestos material that arises during renovation or demolition being subject to the regulations from the time of creation or discovery

  15. Harmful Materials and Residential Demolition

    EPA Pesticide Factsheets

    Certain harmful or problematic materials present in residential buildings may need to be handled differently from general demolition debris. Here is a list of several specific types of materials that may be present in residential buildings.

  16. How EPA's Asbestos Regulations Apply to Transite Siding

    EPA Pesticide Factsheets

    Letters that provide guidance on asbestos National Emissions Standard of Hazardous Air Pollutants (NESHAP) applicability to transite sliding in demolitions, specifically regarding friability, and removal requirements prior to, and after, demolition.

  17. Recycling the construction and demolition waste to produce polymer concrete

    NASA Astrophysics Data System (ADS)

    Hamza, Mohammad T.; Hameed, Awham M., Dr.

    2018-05-01

    The sustainable management for solid wastes of the construction and demolition waste stimulates searching for safety applications for these wastes. The aim of this research is recycling of construction and demolition waste with some different types of polymeric resins to be used in manufacturing process of polymer mortar or polymer concrete, and studying their mechanical and physical properties, and also Specify how the values of compressive strength and the density are affected via the different parameters. In this research two types of construction and demolition waste were used as aggregates replacement (i.e. waste cement/concrete debris, and the waste blocks) while the two types of polymer resins (i.e. Unsaturated polyester and Epoxy) as cement replacements. The used weight percentages of the resins were changed within (1°, 20, 25 and 30) % to manufacture this polymer concrete.

  18. Central Plateau Cleanup at DOE's Hanford Site - 12504

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Dowell, Jonathan

    The discussion of Hanford's Central Plateau includes significant work in and around the center of the Hanford Site - located about 7 miles from the Columbia River. The Central Plateau is the area to which operations will be shrunk in 2015 when River Corridor cleanup is complete. This work includes retrieval and disposal of buried waste from miles of trenches; the cleanup and closure of massive processing canyons; the clean-out and demolition to 'slab on grade' of the high-hazard Plutonium Finishing Plant; installation of key groundwater treatment facilities to contain and shrink plumes of contaminated groundwater; demolition of all othermore » unneeded facilities; and the completion of decisions about remaining Central Plateau waste sites. A stated goal of EM has been to shrink the footprint of active cleanup to less than 10 square miles by 2020. By the end of FY2011, Hanford will have reduced the active footprint of cleanup by 64 percent exceeding the goal of 49 percent. By 2015, Hanford will reduce the active footprint of cleanup by more than 90 percent. The remaining footprint reduction will occur between 2015 and 2020. The Central Plateau is a 75-square-mile region near the center of the Hanford Site including the area designated in the Hanford Comprehensive Land Use Plan Environmental Impact Statement (DOE 1999) and Record of Decision (64 FR 61615) as the Industrial-Exclusive Area, a rectangular area of about 20 square miles in the center of the Central Plateau. The Industrial-Exclusive Area contains the 200 East and 200 West Areas that have been used primarily for Hanford's nuclear fuel processing and waste management and disposal activities. The Central Plateau also encompasses the 200 Area CERCLA National Priorities List site. The Central Plateau has a large physical inventory of chemical processing and support facilities, tank systems, liquid and solid waste disposal and storage facilities, utility systems, administrative facilities, and groundwater monitoring wells. As a companion to the Hanford Site Cleanup Completion Framework document, DOE issued its draft Central Plateau Cleanup Completion Strategy in September 2009 to provide an outline of DOE's vision for completion of cleanup activities across the Central Plateau. As major elements of the Hanford cleanup along the Columbia River Corridor near completion, DOE believed it appropriate to articulate the agency vision for the remainder of the cleanup mission. The Central Plateau Cleanup Completion Strategy and the Hanford Site Cleanup Completion Framework were provided to the regulatory community, the Tribal Nations, political leaders, the public, and Hanford stakeholders to promote dialogue on Hanford's future. The Central Plateau Cleanup Completion Strategy describes DOE's vision for completion of Central Plateau cleanup and outlines the decisions needed to achieve the vision. The Central Plateau strategy involves steps to: (1) contain and remediate contaminated groundwater, (2) implement a geographic cleanup approach that guides remedy selection from a plateau-wide perspective, (3) evaluate and deploy viable treatment methods for deep vadose contamination to provide long-term protection of the groundwater, and (4) conduct essential waste management operations in coordination with cleanup actions. The strategy will also help optimize Central Plateau readiness to use funding when it is available upon completion of River Corridor cleanup projects. One aspect of the Central Plateau strategy is to put in place the process to identify the final footprint for permanent waste management and containment of residual contamination within the 20-square-mile Industrial-Exclusive Area. The final footprint identified for permanent waste management and containment of residual contamination should be as small as practical and remain under federal ownership and control for as long as a potential hazard exists. Outside the final footprint, the remainder of the Central Plateau will be available for other uses consistent with the Hanford Comprehensive Land-Use Plan (DOE 1999), while maintained under federal ownership and control. (author)« less

  19. Citizen Contributions to the Closure of High-Level Waste (HLW) Tanks 18 and 19 at the Department of Energy's (DOE) Savannah River Site (SRS) - 13448

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lawless, W.F.

    2013-07-01

    Citizen involvement in DOE's decision-making for the environmental cleanup from DOE's management of its nuclear wastes across the DOE complex has had a positive effect on the cleanup of its SRS site, characterized by an acceleration of cleanup not only for the Transuranic wastes at SRS, but also for DOE's first two closures of HLW tanks, both of which occurred at SRS. The Citizens around SRS had pushed successfully for the closures of Tanks 17 and 20 in 1997, becoming the first closures of HLW tanks under regulatory guidance in the USA. However, since then, HLW tank closures ceased duemore » to a lawsuit, the application of new tank clean-up technology, interagency squabbling between DOE and NRC over tank closure criteria, and finally and almost fatally, from budget pressures. Despite an agreement with its regulators for the closure of Tanks 18 and 19 by the end of calendar year 2012, the outlook in Fall 2011 to close these two tanks had dimmed. It was at this point that the citizens around SRS became reengaged with tank closures, helping DOE to reach its agreed upon milestone. (authors)« less

  20. River Corridor Cleanup Contract Fiscal Year 2006 Detailed Work Plan: D4 Project/Reactor ISS Closure Projects Field Remediation Project Waste Operations Project End State and Final Closure Project Mission/General Support, Volume 2

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Project Integration

    2005-09-26

    The Hanford Site contains many surplus facilities and waste sites that remain from plutonium production activities. These contaminated facilities and sites must either be stabilized and maintained, or removed, to prevent the escape of potentially hazardous contaminants into the environment and exposure to workers and the public.

  1. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Glucksberg, Nadia; Peters, Jay

    The Conceptual Site Model (CSM) is a powerful tool for understanding the link between contamination sources, cleanup objectives, and ultimate site reuse. The CSM describes the site setting, geology, hydrogeology, potential sources, release mechanisms and migration pathways of contaminants. The CSM is needed to understand the extent of contamination and how receptors may be exposed to both radiological and chemical constituents. A key component of the CSM that is often overlooked concerns how the regulatory requirements drive remediation and how each has to be integrated into the CSM to ensure that all stakeholder requirements are understood and addressed. This papermore » describes how the use of the CSM helped reach closure and reuse at two facilities in Connecticut that are pursuing termination of their Nuclear Regulatory Commission (NRC) license. The two facilities are the Combustion Engineering Site, located in Windsor, Connecticut, (CE Windsor Site) and the Connecticut Yankee Atomic Power Company, located in Haddam Neck, Connecticut (CYAPCO). The closure of each of these facilities is regulated by four agencies: - Nuclear Regulatory Commission (NRC) - which requires cleanup levels for radionuclides to be protective of public health; - US Environmental Protection Agency (USEPA) - which requires cleanup levels for chemicals to be protective of public health and the environment; - Connecticut Department of Environmental Protection (CTDEP) Bureau of Air Management, Radiation Division - which requires cleanup levels for radionuclides to be protective of public health; and - Connecticut Department of Environmental Protection (CTDEP) Bureau of Water Protection and Land Reuse - which requires cleanup levels for chemicals to be protective of public health and the environment. Some of the radionuclides at the CE Windsor Site are also regulated under the Formerly Utilized Site Remedial Action Program (FUSRAP) under the Army Corps of Engineers. The remainder of this paper presents the similarities and differences between the CSMs for these two sites and how each site used the CSM to reach closure. Although each of these site have unique histories and physical features, the CSM approach was used to understand the geology, hydrogeology, migration and exposure pathways, and regulatory requirements to successfully characterize and plan closure of the sites. A summary of how these attributes affected site closure is provided.« less

  2. Demolition Range Noise Abatement Technique Demonstration and Evaluation for the McAlester Army Ammunition Plant

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    CALDERONE,JAMES J.; GARBIN,H. DOUGLAS

    2001-08-01

    Public concern regarding the effects of noise generated by the detonation of excess and obsolete explosive munitions at U.S. Army demolition ranges is a continuing issue for the Army's demilitarization and disposal groups. Recent concerns of citizens living near the McAlester Army Ammunition Plant (MCAAP) in Oklahoma have lead the U.S. Army Defense Ammunition Center (DAC) to conduct a demonstration and evaluation of noise abatement techniques that could be applied to the MCAAP demolition range. With the support of the DAC, MCAAP, and Sandia National Laboratories (SNL), three types of noise abatement techniques were applied: aqueous foams, overburden (using combinationsmore » of sand beds and dirt coverings), and rubber or steel blast mats. Eight test configurations were studied and twenty-four experiments were conducted on the MCAAP demolition range in July of 2000. Instrumentation and data acquisition systems were fielded for the collection of near-field blast pressures, far-field acoustic pressures, plant boundary seismic signals, and demolition range meteorological conditions. The resulting data has been analyzed and reported, and a ranking of each technique's effects has been provided to the DAC.« less

  3. An engineering assessment of the burning of the combustible fraction of construction and demolition wastes in a redundant brick kiln.

    PubMed

    Chang, N B; Lin, K S; Sun, Y P; Wang, H P

    2001-12-01

    This paper confirms both technical feasibility and economic potential via the use of redundant brick kilns as an alternative option for disposal of the combustible fractions of construction and demolition wastes by a three-stage analysis. To assess such an idea, one brick kiln was selected for performing an engineering feasibility study. First of all, field sampling and lab-analyses were carried out to gain a deeper understanding of the physical, chemical, and thermodynamic properties of the combustible fractions of construction and demolition wastes. Kinetic parameters for the oxidation of the combustible fractions of construction and demolition wastes were therefore numerically calculated from the weight loss data obtained through a practice of thermogravimetric analyzer (TGA). Secondly, an engineering assessment for retrofitting the redundant brick kiln was performed based on integrating several new and existing unit operations, consisting of waste storage, shredding, feeding, combustion, flue gas cleaning, and ash removal. Such changes were subject to the operational condition in accordance with the estimated mass and energy balances. Finally, addressing the economic value of energy recovery motivated a renewed interest to convert the combustible fractions of construction and demolition wastes into useful hot water for secondary uses.

  4. Final Environmental Assessment Addressing Building Demolition at Kirtland Air Force Base, New Mexico

    DTIC Science & Technology

    2010-04-01

    erosion potential and runoff; therefore, short-term and long-term, adverse effects on surface waters would be less than significant. Additionally... potential effects on a project site and adjacent land uses. The foremost factor affecting a proposed action in terms of land use is its compliance with...of 50 to 55 dBA or higher on a daily basis. Studies specifically conducted to determine noise effects on various human activities show that about 90

  5. Environmental Assessment for Replace Military Family Housing - Phase VI MacDill AFB, Florida

    DTIC Science & Technology

    2005-01-01

    sulfur oxides (SOx), and particulate matter (PM10) were determined to be less than USEP A de minimis values and less than 10% of the Hillsborough County...by implementation of a sediment and erosion control plan as well as best management practices. Indirect and Cumulative Impacts: There are no site...housing units. The constmction and demolition activities of the Proposed Action were considered in conjunction with other on-going or planned constmction

  6. 35 mm PHOTOGRAPH TAKEN PRIOR TO DEMOLITION OF STRUCTURE. SOUTH ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    35 mm PHOTOGRAPH TAKEN PRIOR TO DEMOLITION OF STRUCTURE. SOUTH (SIDE) AND EAST (FRONT) ELEVATIONS OF BUILDING. VIEW TO NORTHWEST - Plattsburgh Air Force Base, Gas Station, New York Road, Plattsburgh, Clinton County, NY

  7. An empirical investigation of construction and demolition waste generation rates in Shenzhen city, South China.

    PubMed

    Lu, Weisheng; Yuan, Hongping; Li, Jingru; Hao, Jane J L; Mi, Xuming; Ding, Zhikun

    2011-04-01

    The construction and demolition waste generation rates (C&D WGRs) is an important factor in decision-making and management of material waste in any construction site. The present study investigated WGRs by conducting on-site waste sorting and weighing in four ongoing construction projects in Shenzhen city of South China. The results revealed that WGRs ranged from 3.275 to 8.791 kg/m(2) and miscellaneous waste, timber for formwork and falsework, and concrete were the three largest components amongst the generated waste. Based on the WGRs derived from the research, the paper also discussed the main causes of waste in the construction industry and attempted to connect waste generation with specific construction practices. It was recommended that measures mainly including performing waste sorting at source, employing skilful workers, uploading and storing materials properly, promoting waste management capacity, replacing current timber formwork with metal formwork and launching an incentive reward program to encourage waste reduction could be potential solutions to reducing current WGRs in Shenzhen. Although these results were derived from a relatively small sample and so cannot justifiably be generalized, they do however add to the body of knowledge that is currently available for understanding the status of the art of C&D waste management in China. Copyright © 2010 Elsevier Ltd. All rights reserved.

  8. Does Disposing of Construction and Demolition Debris in Unlined Landfills Impact Groundwater Quality? Evidence from 91 Landfill Sites in Florida.

    PubMed

    Powell, Jon T; Jain, Pradeep; Smith, Justin; Townsend, Timothy G; Tolaymat, Thabet M

    2015-08-04

    More than 1,500 construction and demolition debris (CDD) landfills operate in the United States (U.S.), and U.S. federal regulations do not require containment features such as low-permeability liners and leachate collection systems for these facilities. Here we evaluate groundwater quality from samples collected in groundwater monitoring networks at 91 unlined, permitted CDD landfills in Florida, U.S. A total of 460,504 groundwater sample results were analyzed, with a median of 10 years of quarterly or semiannual monitoring data per site including more than 400 different chemical constituents. Downgradient concentrations of total dissolved solids, sulfate, chloride, iron, ammonia-nitrogen, and aluminum were greater than upgradient concentrations (p < 0.05). At downgradient wells where sulfate concentrations were greater than 150 mg/L (approximately 10% of the maximum dissolved sulfate concentration in water, which suggests the presence of leachate from the landfill), iron and arsenic were detected in 91% and 43% of samples, with median concentrations of 1,900 μg/L and 11 μg/L, respectively. These results show that although health-based standards can be exceeded at unlined CDD landfills, the magnitude of detected chemical concentrations is generally small and reflective of leached minerals from components (wood, concrete, and gypsum drywall) that comprise the bulk of discarded CDD by mass.

  9. Development of molecular closures for the reference interaction site model theory with application to square-well and Lennard-Jones homonuclear diatomics.

    PubMed

    Munaò, Gianmarco; Costa, Dino; Caccamo, Carlo

    2016-10-19

    Inspired by significant improvements obtained for the performances of the polymer reference interaction site model (PRISM) theory of the fluid phase when coupled with 'molecular closures' (Schweizer and Yethiraj 1993 J. Chem. Phys. 98 9053), we exploit a matrix generalization of this concept, suitable for the more general RISM framework. We report a preliminary test of the formalism, as applied to prototype square-well homonuclear diatomics. As for the structure, comparison with Monte Carlo shows that molecular closures are slightly more predictive than their 'atomic' counterparts, and thermodynamic properties are equally accurate. We also devise an application of molecular closures to models interacting via continuous, soft-core potentials, by using well established prescriptions in liquid state perturbation theories. In the case of Lennard-Jones dimers, our scheme definitely improves over the atomic one, providing semi-quantitative structural results, and quite good estimates of internal energy, pressure and phase coexistence. Our finding paves the way to a systematic employment of molecular closures within the RISM framework to be applied to more complex systems, such as molecules constituted by several non-equivalent interaction sites.

  10. Closure Report for Corrective Action Unit 563: Septic Systems, Nevada Test Site, Nevada

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NSTec Environmental Restoration

    2010-02-28

    Corrective Action Unit (CAU) 563 is identified in the Federal Facility Agreement and Consent Order (FFACO) as “Septic Systems” and consists of the following four Corrective Action Sites (CASs), located in Areas 3 and 12 of the Nevada Test Site: · CAS 03-04-02, Area 3 Subdock Septic Tank · CAS 03-59-05, Area 3 Subdock Cesspool · CAS 12-59-01, Drilling/Welding Shop Septic Tanks · CAS 12-60-01, Drilling/Welding Shop Outfalls Closure activities were conducted from September to November 2009 in accordance with the FFACO (1996, as amended February 2008) and the Corrective Action Plan for CAU 563. The corrective action alternatives includedmore » No Further Action and Clean Closure.« less

  11. Underground Test Area (UGTA) Closure Report for Corrective Action Unit 98: Frenchman Flat Nevada National Security Site, Nevada, Revision 1 ROTC-1

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Farnham, Irene

    This Closure Report (CR) has been prepared for Corrective Action Unit (CAU) 98, Frenchman Flat, Nevada National Security Site (NNSS), Nevada. The Frenchman Flat CAU was the site of 10 underground nuclear tests, some of which have impacted groundwater near the tests. This work was performed as part of the U.S. Department of Energy, National Nuclear Security Administration Nevada Field Office (NNSA/NFO) Underground Test Area (UGTA) Activity in accordance with the Federal Facility Agreement and Consent Order (FFACO). This CR describes the selected corrective action to be implemented during closure to protect human health and the environment from the impactedmore » groundwater« less

  12. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Muldoon, Joe; Yankovich, Tamara; Schramm, Laurier L.

    The Gunnar Mine and mill site was the largest of some 38 now-abandoned uranium mines that were developed and operated in Northern Saskatchewan, Canada, during the Cold War years. During their operating lifetimes these mines produced large quantities of ore and tailings. The Gunnar mine (open pit and underground) produced over 5 million tonnes of uranium ore and nearly 4.4 million tonnes of mine tailings during its operations from 1955 through 1963. An estimated 2.2 to 2.7 million m{sup 3} of waste rock that was generated during the processing of the ore abuts the shores of Lake Athabasca, the 22.more » largest lake in the world. After closure in the 1960's, the Gunnar site was abandoned with little to no decommissioning being done. The Saskatchewan Research Council has been contracted to manage the clean-up of these abandoned northern uranium mine and mill sites. The Gunnar Mine, because of the magnitude of tailings and waste rock, is subject to an environmental site assessment process regulated by both provincial and federal governments. This process requires a detailed study of the environmental impacts that have resulted from the mining activities and an analysis of projected impacts from remediation efforts. The environmental assessment process, specific site studies, and public involvement initiatives are all now well underway. Due to the many uncertainties associated with an abandoned site, an adaptive remediation approach, utilizing a decision tree, presented within the environmental assessment documents will be used as part of the site regulatory licensing. A critical early task was dealing with major public safety hazards on the site. The site originally included many buildings that were remnants of a community of approximately 800 people who once occupied the site. These buildings, many of which contained high levels of asbestos, had to be appropriately abated and demolished. Similarly, the original mine head frame and mill site buildings, many of which still contained the original machinery and equipment, also had to be dismantled. Remediation options for the accumulated demolition debris have been assessed, as have remediation options for the waste rock and tailings, all of which form part of the environmental assessment. The regulatory requirements include the environmental assessment processes, a complex public involvement strategy, and licensing from the Canadian Nuclear Safety Commission (CNSC) with the long-term goal of releasing the property in a remediated and stable state to the Province of Saskatchewan. Prescribed environmental and land use endpoints will be determined based on the environmental assessment studies and remediation options analyzed and implemented. Ultimately, the site will be released into an institutional controls program that will allow long-term government management and monitoring. (authors)« less

  13. How EPA's Asbestos Regulations Apply to Municipal Demolition Activities

    EPA Pesticide Factsheets

    Memos about the Asbestos National Emissions Standard for Hazardous Air Pollutants provide clarification on demolition concerns such as the definition of a facility, and the applicability of asbestos NESHAP to structures demolished by municipal entities.

  14. A Guide to Normal Demolition Practices Under the Asbestos NESHAP (EPA-340/1-92-013)

    EPA Pesticide Factsheets

    This document includes demolition practices, waste handling procedures, and definitions of terms taken from the November 20,1990 revision of the asbestos National Emissions Standard for Hazardous Air Pollutants regulation.

  15. An ecological assessment of a bridge demolition.

    DOT National Transportation Integrated Search

    1975-01-01

    Bridge demolition has long been known to mobilize large amounts of stream sediment in the immediate area of the structure. An ecological assessment in terms of stream macroinvertebrate samples and suspended solids measurements was made shortly before...

  16. 6. Detail of interior bin wall section, during demolition. Shows ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    6. Detail of interior bin wall section, during demolition. Shows alternating courses of channel tile with steel bands and largers hollow tile. - Saint Anthony Elevator No. 3, 620 Malcom Avenue, Southeast, Minneapolis, Hennepin County, MN

  17. Pilot-based assessment of the economics of recycling construction demolition waste.

    PubMed

    Srour, Issam M; Chehab, Ghassan R; El-Fadel, Mutasem; Tamraz, Sandy

    2013-11-01

    The significant amount of waste generated from construction demolition has become a chronic problem in many developing countries. Using data obtained from demolition contractors and various other sources, this paper proposes a framework for proper handling of construction demolition waste (CDW) to serve as a decision support tool in countries suffering from the lack of national CDW management guidelines. The framework is then demonstrated through a case study in the city of Beirut, Lebanon, and a sensitivity analysis is carried out to examine the economic feasibility of developing a recycling facility. The analysis showed that in order for a facility to be feasible, a gate fee should be charged in the presence of a market for recycled aggregates. The results confirm the significance of instigating and implementing legislation to control illegal dumping, constructing, and managing engineered landfills, and establishing markets for recycled CDW.

  18. 40 CFR 267.142 - Cost estimate for closure.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... that on-site disposal capacity will exist at all times over the life of the facility. (3) The closure...) The owner or operator must keep the following at the facility during the operating life of the... PERMIT Financial Requirements § 267.142 Cost estimate for closure. (a) The owner or operator must have at...

  19. 40 CFR 267.142 - Cost estimate for closure.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... that on-site disposal capacity will exist at all times over the life of the facility. (3) The closure...) The owner or operator must keep the following at the facility during the operating life of the... PERMIT Financial Requirements § 267.142 Cost estimate for closure. (a) The owner or operator must have at...

  20. A Spanish model for quantification and management of construction waste.

    PubMed

    Solís-Guzmán, Jaime; Marrero, Madelyn; Montes-Delgado, Maria Victoria; Ramírez-de-Arellano, Antonio

    2009-09-01

    Currently, construction and demolition waste (C&D waste) is a worldwide issue that concerns not only governments but also the building actors involved in construction activity. In Spain, a new national decree has been regulating the production and management of C&D waste since February 2008. The present work describes the waste management model that has inspired this decree: the Alcores model implemented with good results in Los Alcores Community (Seville, Spain). A detailed model is also provided to estimate the volume of waste that is expected to be generated on the building site. The quantification of C&D waste volume, from the project stage, is essential for the building actors to properly plan and control its disposal. This quantification model has been developed by studying 100 dwelling projects, especially their bill of quantities, and defining three coefficients to estimate the demolished volume (CT), the wreckage volume (CR) and the packaging volume (CE). Finally, two case studies are included to illustrate the usefulness of the model to estimate C&D waste volume in both new construction and demolition projects.

  1. Resource Conservation and Recovery Act closure report: Area 2 Bitcutter and Postshot Containment Shops Injection Wells, Correction Action Unit 90

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    This Closure Report provides documentation of the activities conducted during the Resource Conservation and Recovery Act (RCRA) closure of the Bitcutter and Postshot Containment Shops Injection Wells located in Area 2 of the Nevada Test Site (NTS), Oak Spring Quadrangle (USGS, 1986), Township 10 South, Range 53 East, Nye County, Nevada. This report discusses the Bitcutter Shop Inside Injection Well (CAU 90-A) closure-in-place and the Bitcutter Shop Outside Injection Well (CAU 90-B) and Postshot Containment Shop Injection Well (CAU 90-C) clean closures. This Closure Report provides background information about the unit, the results of the characterization activities and actions conductedmore » to determine the closure design. It also provides a discussion of the drainage analysis, preliminary closure activities, final closure activities, waste management activities, and the Post-Closure Care requirements.« less

  2. 2011 River Corridor Closure Contractor Revegetation and Mitigation Monitoring Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    West, W. J.; Lucas, J. G.; Gano, K. A.

    2011-11-14

    This report documents the status of revegetation projects and natural resources mitigation efforts conducted for remediated waste sites and other activities associated with the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 cleanup of National Priorities List waste sites at Hanford. This report contains the vegetation monitoring data that was collected in the spring and summer of 2011 from the River Corridor Closure Contractor’s revegetation and mitigation areas on the Hanford Site.

  3. Corrective Action Decision Document/Closure Report for Corrective Action Unit 252: Area 25 Engine Test Stand 1 Decontamination Pad, Nevada Test Site, Nevada

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    DOE /NV

    This Corrective Action Decision Document/Closure Report (CADD/CR) has been prepared for Corrective Action Unit (CAU) 252: Area 25 Engine Test Stand-1 Decontamination Pad, in accordance with the Federal Facility Agreement and Consent Order (FFACO). Located at the Nevada Test Site in Nevada, CAU 252 consists of only one Corrective Action Site (25-07-04, Decontamination Pad). This CADD/CR identifies and rationalizes the U.S. Department of Energy, Nevada Operations Office's (DOE/NV's) recommendation that no corrective action is deemed necessary at CAU 252. The Corrective Action Decision Document and Closure Report have been combined into one report because the potential contaminants of concern weremore » either not detected during the corrective action investigation or were only present at naturally occurring concentrations. Based on the field results, neither corrective action or a corrective action plan is required at this site. A Notice of Completion to DOE/NV is being requested from the Nevada Division of Environmental Protection for closure of CAU 252, as well as a request that this site be moved from Appendix III to Appendix IV of the FFACO. Further, no use restrictions are required to be placed on this CAU.« less

  4. Report: Significant Modifications Needed To Ensure Success of Fort Worth Asbestos Demolition Method

    EPA Pesticide Factsheets

    Report #2004-P-00002, December 19, 2003. According to the Environmental Protection Agency's (EPA) National Asbestos Registry System, over 166,000 asbestos demolition and/or renovation projects were conducted in the last two years.

  5. 16. DETAIL VIEW OF BRIDGE DECK DURING DEMOLITION, SHOWING EXTRADOSAL ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    16. DETAIL VIEW OF BRIDGE DECK DURING DEMOLITION, SHOWING EXTRADOSAL REINFORCING BARS OF PATENTED THACHER TYPE, AND PLAIN TRANSVERSE BARS CONNECTING EXTRADOSAL AND INTRADOSAL REINFORCEMENTS - Sanderson Avenue Bridge, Sanderson Avenue spanning Lackawanna River, Scranton, Lackawanna County, PA

  6. 75 FR 34172 - Rexam Closure Systems, Inc., a Subsidiary of Rexam PLC, Including On-Site Leased Workers From...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-16

    ..., Inc., a Subsidiary of Rexam PLC, Including On-Site Leased Workers From Addeco Employment Services and... PLC, Hamlet, North Carolina. The notice was published in the Federal Register on April 23, 2010 (75 FR... at the Hamlet, North Carolina location of Rexam Closure Systems, Inc., a subsidiary of Rexam PLC. The...

  7. Closure Report for Corrective Action Unit 412: Clean Slate I Plutonium Dispersion (TTR) Tonopah Test Range, Nevada, Revision 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Matthews, Patrick

    This Closure Report (CR) presents information supporting the clean closure of Corrective Action Unit (CAU) 412: Clean Slate I Plutonium Dispersion (TTR), located on the Tonopah Test Range, Nevada. CAU 412 consists of a release of radionuclides to the surrounding soil from a storage–transportation test conducted on May 25, 1963. Corrective action investigation (CAI) activities were performed in April and May 2015, as set forth in the Streamlined Approach for Environmental Restoration (SAFER) Plan for Corrective Action Unit 412: Clean Slate I Plutonium Dispersion (TTR), Tonopah Test Range, Nevada; and in accordance with the Soils Activity Quality Assurance Plan. Themore » purpose of the CAI was to fulfill data needs as defined during the data quality objectives process. The CAU 412 dataset of investigation results was evaluated based on a data quality assessment. This assessment demonstrated the dataset is complete and acceptable for use in fulfilling the data needs identified by the data quality objectives process. This CR provides documentation and justification for the clean closure of CAU 412 under the FFACO without further corrective action. This justification is based on historical knowledge of the site, previous site investigations, implementation of the 1997 interim corrective action, and the results of the CAI. The corrective action of clean closure was confirmed as appropriate for closure of CAU 412 based on achievement of the following closure objectives: Radiological contamination at the site is less than the final action level using the ground troops exposure scenario (i.e., the radiological dose is less than the final action level): Removable alpha contamination is less than the high contamination area criterion: No potential source material is present at the site, and any impacted soil associated with potential source material has been removed so that remaining soil contains contaminants at concentrations less than the final action levels: and There is sufficient information to characterize investigation and remediation waste for disposal.« less

  8. Comparison of W-Plasty vs Traditional Straight-Line Techniques for Primary Paramedian Forehead Flap Donor Site Closure.

    PubMed

    Jáuregui, Emmanuel J; Tummala, Neelima; Seth, Rahul; Arron, Sarah; Neuhaus, Isaac; Yu, Siegrid; Grekin, Roy; Knott, P Daniel

    2016-07-01

    The paramedian forehead flap (PMFF) donor site scar is hard to disguise and may be a source of patient dissatisfaction. To evaluate the aesthetic outcome of W-plasty vs traditional straight-line (SL) closure techniques of the PMFF donor site. A retrospective cohort study was conducted at the University of California, San Francisco Medical Center. Clinical history and operative reports were reviewed for 31 patients who underwent a PMFF procedure performed between November 1, 2011, and May 29, 2014. Blinded photographic analysis of postoperative photographs was performed. The pedicled component of the PMFF was raised primarily with either a W-plasty or traditional SL design. Standard photographs of the donor site, obtained at least 90 days after surgery, were reviewed and scored in a blinded fashion by 4 dermatologic surgeons using a 100-point visual analog scale (from 0 [worst possible outcome] to 100 [best possible outcome]) and a 5-point Likert scale (from very poor to excellent). Interrater reliability was assessed via Cronbach α testing. All 31 forehead flaps survived during this study period; 16 PMFFs were raised with the W-plasty technique and 15 were raised with the SL technique. The W-plasty and SL groups were similar in terms of age, sex, and race/ethnicity (mean [SD] age, 68.4 [12.4] vs 61.8 [11.6] years; 13 [84%] vs 9 [60%] men; and 15 [94%] vs 13 [87%] white). Patients undergoing W-plasty closure had significantly higher mean visual analog scale scores compared with those undergoing SL closure (72.8 [18.3] vs 65.6 [18.1]; P = .03). Mean Likert scale scores for W-plasty were higher than those for SL closure, but the difference was not significant (3.77 [1.02] vs 3.43 [0.98]; P = .08). Overall interrater reliability for the visual analog scale and Likert scale scores were 0.67 and 0.58, respectively. Patients undergoing PMFF donor site closure using a primary W-plasty technique demonstrated better mean scar appearance of the forehead donor site compared with SL closure. The primary W-plasty technique did not result in any PMFF losses and should be considered for appropriate patients. 3.

  9. Safety and efficacy of excision and direct closure in acute burns surgery: outcome analysis in a prospective series of 100 patients and a survey of UK burns surgeons' attitudes.

    PubMed

    Bain, Charles J; Wang, Tim; McArthur, Gordon; Williams, Greg; Atkins, Joanne; Jones, Isabel

    2014-12-01

    Many burns surgeons avoid excision and direct closure of acute burns owing to concerns over wound dehiscence, scarring and infection. There is no evidence in the literature to support this practice. We present outcomes of a prospective series of 100 patients who underwent excision and direct closure of 138 burns over a 2-year period, along with results from a survey sent to 33 senior burns surgeons to gauge attitudes towards direct closure in burns surgery. 47% of survey respondents never perform direct closure. Dehiscence was cited as the most common concern, followed by hypertrophic scarring (HTS). In our cohort, the superficial dehiscence rate was 12% and the HTS rate was 16%, with no scarring contractures. Patients with healing time greater than 14 days were more likely to develop HTS (p=0.008), as were those with wound dehiscence (p=0.014). Patients undergoing part-grafting in addition to direct closure took significantly longer to heal than those undergoing direct closure alone (p=0.0002), with the donor site or graft delaying healing in the majority. Excision and direct closure of acute burn wounds avoids donor site morbidity and has an acceptable complication rate. It is a safe and effective treatment for full thickness burns in selected cases. Copyright © 2014 Elsevier Ltd and ISBI. All rights reserved.

  10. Closure Report for Corrective Action Unit 151: Septic Systems and Discharge Area, Nevada Test Site, Nevada

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NSTec Environmental Restoration

    2008-04-01

    Corrective Action Unit (CAU) 151 is identified in the Federal Facility Agreement and Consent Order (FFACO) as Septic Systems and Discharge Area. CAU 151 consists of the following eight Corrective Action Sites (CASs), located in Areas 2, 12, and 18 of the Nevada Test Site, approximately 65 miles northwest of Las Vegas, Nevada: (1) CAS 02-05-01, UE-2ce Pond; (2) CAS 12-03-01, Sewage Lagoons (6); (3) CAS 12-04-01, Septic Tanks; (4) CAS 12-04-02, Septic Tanks; (5) CAS 12-04-03, Septic Tank; (6) CAS 12-47-01, Wastewater Pond; (7) CAS 18-03-01, Sewage Lagoon; and (8) CAS 18-99-09, Sewer Line (Exposed). CAU 151 closure activitiesmore » were conducted according to the FFACO (FFACO, 1996; as amended February 2008) and the Corrective Action Plan for CAU 151 (U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office, 2007) from October 2007 to January 2008. The corrective action alternatives included no further action, clean closure, and closure in place with administrative controls. CAU 151 closure activities are summarized in Table 1. Closure activities generated liquid remediation waste, sanitary waste, hydrocarbon waste, and mixed waste. Waste generated was appropriately managed and disposed. Waste that is currently staged onsite is being appropriately managed and will be disposed under approved waste profiles in permitted landfills. Waste minimization activities included waste characterization sampling and segregation of waste streams. Some waste exceeded land disposal restriction limits and required offsite treatment prior to disposal. Other waste meeting land disposal restrictions was disposed of in appropriate onsite or offsite landfills. Waste disposition documentation is included as Appendix C.« less

  11. Closure Report for Corrective Action Unit 562: Waste Systems, Nevada National Security Site, Nevada

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NSTec Environmental Restoration

    2012-08-15

    This Closure Report (CR) presents information supporting closure of Corrective Action Unit (CAU) 562, Waste Systems, and provides documentation supporting the completed corrective actions and confirmation that closure objectives for CAU 562 were met. This CR complies with the requirements of the Federal Facility Agreement and Consent Order (FFACO) that was agreed to by the State of Nevada; the U.S. Department of Energy (DOE), Environmental Management; the U.S. Department of Defense; and DOE, Legacy Management (FFACO, 1996 as amended). CAU 562 consists of the following 13 Corrective Action Sites (CASs), located in Areas 2, 23, and 25 of the Nevadamore » National Security Site: · CAS 02-26-11, Lead Shot · CAS 02-44-02, Paint Spills and French Drain · CAS 02-59-01, Septic System · CAS 02-60-01, Concrete Drain · CAS 02-60-02, French Drain · CAS 02-60-03, Steam Cleaning Drain · CAS 02-60-04, French Drain · CAS 02-60-05, French Drain · CAS 02-60-06, French Drain · CAS 02-60-07, French Drain · CAS 23-60-01, Mud Trap Drain and Outfall · CAS 23-99-06, Grease Trap · CAS 25-60-04, Building 3123 Outfalls Closure activities began in October 2011 and were completed in April 2012. Activities were conducted according to the Corrective Action Plan for CAU 562 (U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office [NNSA/NSO], 2011). The corrective actions included No Further Action and Clean Closure. Closure activities generated sanitary waste and hazardous waste. Some wastes exceeded land disposal limits and required offsite treatment prior to disposal. Other wastes met land disposal restrictions and were disposed in appropriate onsite or offsite landfills. NNSA/NSO requests the following: · A Notice of Completion from the Nevada Division of Environmental Protection to NNSA/NSO for closure of CAU 562 · The transfer of CAU 562 from Appendix III to Appendix IV, Closed Corrective Action Units, of the FFACO« less

  12. Contingency Contracting in Support of Conus Disasters: A Case Study of the 1994 Northridge Earthquake, 2005 Hurricane Katrina and 2012 Hurricane Sandy

    DTIC Science & Technology

    2014-06-01

    Northridge earthquake response. The City of Los Angeles and the State of California required contracts to address recycling of demolition materials to the...materials directly recycled and material removed from the site on the enclosed recycling log found within this Contract. Documentation includes...related to recycling disaster debris:  “Incentive payment: The City will pay tipping fees using the existing authorization letter; however, only source

  13. Programmatic Environmental Assessment for the Construction, Maintenance and Demolition of Communications, Wind, Water, and Camera Towers at the 45th Space Wing, Florida

    DTIC Science & Technology

    2005-10-01

    species (e.g., cogon grass ) have also been identified by 45 SW biologists. 3.1.4.2 Native Vegetation Communities and Wildlife Most (about 80%) of...towers/antenna equipment sites are located at PAFB. All towers are surrounded by either regularly maintained grasses or impervious surfaces...widespread of these is Australian pine. Australian pine trees grow singly or as small, dense groves scattered across the base. In addition, cogon

  14. Environmental Assessment: Demolition of McGuire Central Heat Plant at Joint Base McGuire-Dix-Lakehurst, New Jersey

    DTIC Science & Technology

    2012-06-01

    insulation, boiler, holding tank and duct coverings, floor tiles , window caulking/glazing, and corrugated building siding. The asbestos insulation and...facility, with the Bulk Fuel Storage area and the golf course located between them. BOMARC is located several miles from the proposed solar sites...Architectural Resources The Central Heat Plant was constructed in 1956. It is a flat- roofed building originally rectangular in form, and is now L-shaped. The

  15. On the Road to Reuse: Residential Demolition Bid Specification Development Tool Report & Factsheet - September 2013

    EPA Pesticide Factsheets

    The September 2013 EPA Region 5 report and factsheet provide tools to help with waste management plans, waste disposal, handling hazardous materials, and earthwork. The documents also suggest demolition modifications to improve environmental results.

  16. 29 CFR 570.66 - Occupations involved in wrecking, demolition, and shipbreaking operations (Order 15).

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Detrimental to Their Health or Well-Being § 570.66 Occupations involved in wrecking, demolition, and... and 18 years of age and detrimental to their health and well-being. (b) Definition. The term wrecking...

  17. Senseless demolition in progress, showing destruction of perfectly decent and ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Senseless demolition in progress, showing destruction of perfectly decent and recyclable mill building. Problem exacerbated by high value of scrap iron. - Phoenix Iron Company, Rolling Mill, North of French Creek, west of Fairview Avenue, Phoenixville, Chester County, PA

  18. Brownfields Recover Your Resources - Reduce, Reuse, and Recycle Construction and Demolition Materials at Land Revitalization Projects

    EPA Pesticide Factsheets

    This document provides background information on how the sustainable reuse of brownfield properties includes efforts to reduce the environmental impact by reusing and recycling materials generated during building construction, demolition, or renovation.

  19. Improvement of the material and transport component of the system of construction waste management

    NASA Astrophysics Data System (ADS)

    Kostyshak, Mikhail; Lunyakov, Mikhail

    2017-10-01

    Relevance of the topic of selected research is conditioned with the growth of construction operations and growth rates of construction and demolition wastes. This article considers modern approaches to the management of turnover of construction waste, sequence of reconstruction or demolition processes of the building, information flow of the complete cycle of turnover of construction and demolition waste, methods for improvement of the material and transport component of the construction waste management system. Performed analysis showed that mechanism of management of construction waste allows to increase efficiency and environmental safety of this branch and regions.

  20. Partially Testing a Process Model for Understanding Victim Responses to an Anticipated Worksite Closure

    ERIC Educational Resources Information Center

    Blau, Gary

    2007-01-01

    This study partially tested a recent process model for understanding victim responses to worksite/function closure (W/FC) proposed by Blau [Blau, G. (2006). A process model for understanding victim responses to worksite/function closure. "Human Resource Management Review," 16, 12-28], in a pharmaceutical manufacturing site. Central to the model…

  1. Understanding the basis of space closure in Orthodontics for a more efficient orthodontic treatment

    PubMed Central

    Ribeiro, Gerson Luiz Ulema; Jacob, Helder B.

    2016-01-01

    ABSTRACT Introduction: Space closure is one of the most challenging processes in Orthodontics and requires a solid comprehension of biomechanics in order to avoid undesirable side effects. Understanding the biomechanical basis of space closure better enables clinicians to determine anchorage and treatment options. In spite of the variety of appliance designs, space closure can be performed by means of friction or frictionless mechanics, and each technique has its advantages and disadvantages. Friction mechanics or sliding mechanics is attractive because of its simplicity; the space site is closed by means of elastics or coil springs to provide force, and the brackets slide on the orthodontic archwire. On the other hand, frictionless mechanics uses loop bends to generate force to close the space site, allowing differential moments in the active and reactive units, leading to a less or more anchorage control, depending on the situation. Objective: This article will discuss various theoretical aspects and methods of space closure based on biomechanical concepts. PMID:27275623

  2. Understanding the basis of space closure in Orthodontics for a more efficient orthodontic treatment.

    PubMed

    Ribeiro, Gerson Luiz Ulema; Jacob, Helder B

    2016-01-01

    Space closure is one of the most challenging processes in Orthodontics and requires a solid comprehension of biomechanics in order to avoid undesirable side effects. Understanding the biomechanical basis of space closure better enables clinicians to determine anchorage and treatment options. In spite of the variety of appliance designs, space closure can be performed by means of friction or frictionless mechanics, and each technique has its advantages and disadvantages. Friction mechanics or sliding mechanics is attractive because of its simplicity; the space site is closed by means of elastics or coil springs to provide force, and the brackets slide on the orthodontic archwire. On the other hand, frictionless mechanics uses loop bends to generate force to close the space site, allowing differential moments in the active and reactive units, leading to a less or more anchorage control, depending on the situation. This article will discuss various theoretical aspects and methods of space closure based on biomechanical concepts.

  3. Installation restoration program. Closure assessment report for UST removals at sites 4 and 5 - petroleum, oils, and lubricants facility. Virginia Air National Guard, 192nd Fighter Group, Richmond International Airport, Sandston, Virginia. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    The objectives of the closure assessment were to determine the extent of contaminated soil adjacent to the USTs requiring excavation, to provide documentation of soil and groundwater conditions following excavation, and to document closure activities in accordance with applicable VADEQ regulations. During closure activities, ASI provided technical support to the Base to ensure that the UST removal contractor (E K, Inc.) hereinafter referred to as the Contractor was in compliance with the technical requirements (as specified in the Plans and Specifications for Removal of Abandoned Underground Storage Tanks, Virginia Air National Guard, Richmond International Airport, Sandston, VA., dated July 1991more » and revised April 1992, and Addendum Numbers 1 through 7) of the contract. ASI was also responsible for collecting soil and/or groundwater closure samples from the excavations, and providing off-site fixed based laboratory analysis to verify clean conditions within the excavations.« less

  4. The Impact of Public Hospital Closure on Medical and Residency Education: Implications and Recommendations

    PubMed Central

    Walker, Kara Odom; Calmes, Daphne; Hanna, Nancy; Baker, Richard

    2010-01-01

    Background Challenges around safety-net hospital closure have impacted medical student and resident exposure to urban public healthcare sites that may influence their future practice choices. Objective To assess the impact of the closure of a public safety-net teaching hospital for the clinical medical education of Charles Drew University medical students and residents. Method Retrospective cohort study of medical students’ and residents’ and clinical placement into safety-net experiences after the closure of the primary teaching hospital. Results The hospital closure impacted both medical student and residency training experiences. Only 71% (17/24) of medical student rotations and 13% (23/180) of residents were maintained at public safety-net clinical sittings. The closure of the public safety-net hospital resulted in the loss of 36% of residency training spots sponsored by historically black medical schools in the United States and an even larger negative impact on the number of physicians training in underserved urban areas of Los Angeles County. Conclusion While the medical educational program changes undertaken in the wake of hospital closure have negatively affected the immediate clinical educational experiences of medical students and residents, it remains to be seen whether the training site location changes will alter their long-term preferences in specialty choice and practice location. PMID:19110905

  5. The impact of public hospital closure on medical and residency education: implications and recommendations.

    PubMed

    Walker, Kara Odom; Calmes, Daphne; Hanna, Nancy; Baker, Richard

    2008-12-01

    Challenges around safety-net hospital closure have impacted medical student and resident exposure to urban public healthcare sites that may influence their future practice choices. To assess the impact of the closure of a public safety-net teaching hospital for the clinical medical education of Charles Drew University medical students and residents. Retrospective cohort study of medical students' and residents' and clinical placement into safety-net experiences after the closure of the primary teaching hospital. The hospital closure impacted both medical student and residency training experiences. Only 71% (17/24) of medical student rotations and 13% (23/180) of residents were maintained at public safety-net clinical sittings. The closure of the public safety-net hospital resulted in the loss of 36% of residency training spots sponsored by historically black medical schools in the United States and an even larger negative impact on the number of physicians training in underserved urban areas of Los Angeles County. While the medical educational program changes undertaken in the wake of hospital closure have negatively affected the immediate clinical educational experiences of medical students and residents, it remains to be seen whether the training site location changes will alter their long-term preferences in specialty choice and practice location.

  6. Perforator flap based on the third perforator of the profunda femoris artery (PFA)-assisted closure of the free vertical posteromedial thigh (vPMT) flap donor site.

    PubMed

    Scaglioni, Mario F; Barth, Andrè A; Chen, Yen-Chou

    2018-06-19

    The primary closure of the vertical posteromedial thigh (vPMT) free flap donor site is very important to minimize donor site morbidity and maximize cosmetic appearance. However, sometimes due to the dimension of the defect, a vPMT flap is wider than the 8-10 cm requirement. The authors report their experience with the third perforator of the profunda femoris artery (PFA) during the vPMT free flap donor-site closure. Between January 2016 and December 2017, 5 patients underwent reconstruction of lower extremity (2 pts.) and head and neck (3 pts.) area with the free vPMT flaps. Attempts to close the vPMT free flap donor site directly failed due to the flaps' width (average: 11 cm) and pedicled perforator flaps based on the third perforator of the PFA at the distal thigh were harvested to close the defect primary without the use of a skin graft. The size of perforator flap based on 3rd perforator of PFA was on average 6 cm × 4 cm (ranged: 4-8 cm × 3-6 cm). In all patients, the third perforator of the PFA was identified and the perforator diameter was on average 2.0 mm (range, 1.8-2.2 mm). All perforators were musculocutaneous and single. The dimensions of the flaps were on average 6 cm × 4 cm (range: 4 to 8 cm × 3 to 6 cm). All flaps healed uneventfully without complications and the patients were satisfied with cosmetic and functional results at 6 months follow-up. The third perforator of the PFA may be an option to ensure primary closure of the PMT flap donor site, when a larger flap for reconstruction is needed with subsequent impossibility to achieve primary closure of the donor site. © 2018 Wiley Periodicals, Inc.

  7. Recovery Act Weekly Video: 200 Area Asbestos Removal, U-Ancillary Demolition, 200 West Transfer Building Footings

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    A weekly update of the Recovery Act at work. Demolition of U-Ancillary that was contaminated with uranium and asbestos as well as removing asbestos from the Steam Generation Plant in the 200 East Area.

  8. 24 CFR 969.107 - HUD approval of demolition or disposition before ACC expiration.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... disposition before ACC expiration. 969.107 Section 969.107 Housing and Urban Development Regulations Relating... before ACC expiration. This part is not intended to preclude or restrict the demolition or disposition of... before the ACC Expiration Date. ...

  9. Recovery Act Weekly Video: 200 Area Asbestos Removal, U-Ancillary Demolition, 200 West Transfer Building Footings

    ScienceCinema

    None

    2018-05-23

    A weekly update of the Recovery Act at work. Demolition of U-Ancillary that was contaminated with uranium and asbestos as well as removing asbestos from the Steam Generation Plant in the 200 East Area.

  10. 77 FR 66541 - Safety Zone; Alliance Road Bridge Demolition; Black Warrior River, Locust Fork; Birmingham, AL

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-06

    ... 1625-AA00 Safety Zone; Alliance Road Bridge Demolition; Black Warrior River, Locust Fork; Birmingham... of the Alliance Road Bridge (Co. Rd. 61). Entry into, transiting or anchoring in this zone is.... [[Page 66542

  11. Closure Report for Corrective Action Unit 539: Areas 25 and 26 Railroad Tracks Nevada National Security Site, Nevada with ROTC-1, Revision 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Mark Kauss

    2011-06-01

    This Closure Report (CR) presents information supporting the closure of Corrective Action Unit (CAU) 539: Areas 25 and 26 Railroad Tracks, Nevada National Security Site, Nevada. This CR complies with the requirements of the Federal Facility Agreement and Consent Order (FFACO) that was agreed to by the State of Nevada; U.S. Department of Energy (DOE), Environmental Management; U.S. Department of Defense; and DOE, Legacy Management. The corrective action sites (CASs) within CAU 539 are located within Areas 25 and 26 of the Nevada National Security Site. Corrective Action Unit 539 comprises the following CASs: • 25-99-21, Area 25 Railroad Tracksmore » • 26-99-05, Area 26 Railroad Tracks The purpose of this CR is to provide documentation supporting the completed corrective actions and provide data confirming that the closure objectives for CASs within CAU 539 were met. To achieve this, the following actions were performed: • Reviewed documentation on historical and current site conditions, including the concentration and extent of contamination. • Conducted radiological walkover surveys of railroad tracks in both Areas 25 and 26. • Collected ballast and soil samples and calculated internal dose estimates for radiological releases. • Collected in situ thermoluminescent dosimeter measurements and calculated external dose estimates for radiological releases. • Removed lead bricks as potential source material (PSM) and collected verification samples. • Implemented corrective actions as necessary to protect human health and the environment. • Properly disposed of corrective action and investigation wastes. • Implemented an FFACO use restriction (UR) for radiological contamination at CAS 25-99-21. The approved UR form and map are provided in Appendix F and will be filed in the DOE, National Nuclear Security Administration Nevada Site Office (NNSA/NSO), Facility Information Management System; the FFACO database; and the NNSA/NSO CAU/CAS files. From November 29, 2010, through May 2, 2011, closure activities were performed as set forth in the Streamlined Approach for Environmental Restoration (SAFER) Plan for Corrective Action Unit 539: Areas 25 and 26 Railroad Tracks, Nevada Test Site, Nevada. The purposes of the activities as defined during the data quality objectives process were as follows: • Determine whether contaminants of concern (COCs) are present. • If COCs are present, determine their nature and extent, implement appropriate corrective actions, and properly dispose of wastes. Analytes detected during the closure activities were evaluated against final action levels (FALs) to determine COCs for CAU 539. Assessment of the data generated from closure activities revealed the following: • At CAS 26-99-05, the total effective dose for radiological releases did not exceed the FAL of 25 millirem per Industrial Area year. Potential source material in the form of lead bricks was found at three locations. A corrective action of clean closure was implemented at these locations, and verification samples indicated that no further action is necessary. • At CAS 25-99-21, the total effective dose for radiological releases exceeds the FAL of 25 millirem per Industrial Area year. Potential source material in the form of lead bricks was found at eight locations. A corrective action was implemented by removing the lead bricks and soil above FALs at these locations, and verification samples indicated that no further action is necessary. Pieces of debris with high radioactivity were identified as PSM and remain within the CAS boundary. A corrective action of closure in place with a UR was implemented at this CAS because closure activities showed evidence of remaining soil contamination and radioactive PSM. Future land use will be restricted from surface and intrusive activities. Closure activities generated waste streams consisting of industrial solid waste, recyclable materials, low-level radioactive waste, and mixed low-level radioactive waste. Wastes were disposed of in the appropriate onsite landfills. The NNSA/NSO provides the following recommendations: • Clean closure is required at CAS 26-99-05. • Closure in place is required at CAS 25-99-21. • A UR is required at CAS 25-99-21. • A Notice of Completion to the NNSA/NSO is requested from the Nevada Division of Environmental Protection for closure of CAU 539. • Corrective Action Unit 539 should be moved from Appendix III to Appendix IV of the FFACO.« less

  12. Overview On Alternative Asbestos Control Method Research: Alternative Methods To Demolition

    EPA Science Inventory

    The Alternative Asbestos Control Method (AACM) is an experimental approach to building demolition. Unlike the NESHAP method, the AACM allows some regulated asbestos-containing material to remain in the building and a surfactant-water solution is used to suppress asbestos fibers ...

  13. Silicone absorption of elastomeric closures--an accelerated study.

    PubMed

    Degrazio, F L; Hlobik, T; Vaughan, S

    1998-01-01

    There is a trend in the parenteral industry to move from the use of elastomeric closures which are washed, siliconized, dried and sterilized in-house at the pharmaceutical manufacturers' site to pre-prepared closures purchased from the closure supplier. This preparation can consist of washing to reduce particle-load and bioburden, siliconization, placement in ready-to-sterilize bags and may eventually extend to sterilization by steam autoclave or gamma irradiation. Since silicone oil lubrication is critical to the processability/machinability of closures, research was designed to investigate this phenomenon in closures prepared using the Westar RS (Ready-to-Sterilize) process. This paper presents the data gathered in a study of the characteristic of silicone absorption into elastomeric closures under accelerated conditions. Variables such as silicone viscosity, rubber formulation, effect of sterilization and others are considered.

  14. Quantities of Arsenic-Treated Wood in Demolition Debris Generated by Hurricane Katrina

    PubMed Central

    Dubey, Brajesh; Solo-Gabriele, Helena M.; Townsend, Timothy G.

    2008-01-01

    The disaster debris from Hurricane Katrina is one of the largest in terms of volume and economic loss in American history. One of the major components of the demolition debris is wood waste of which a significant proportion is treated with preservatives, including preservatives containing arsenic. As a result of the large scale destruction of treated wood structures such as electrical poles, fences, decks, and homes a considerable amount of treated wood and consequently arsenic will be disposed as disaster debris. In this study an effort was made to estimate the quantity of arsenic disposed through demolition debris generated in the Louisiana and Mississippi area through Hurricane Katrina. Of the 72 million cubic meters of disaster debris generated, roughly 12 million cubic meters were in the form of construction and demolition wood resulting in an estimated 1740 metric tons of arsenic disposed. Management of disaster debris should consider the relatively large quantities of arsenic associated with pressure-treated wood. PMID:17396637

  15. Early postoperative healing following buccal single flap approach to access intraosseous periodontal defects.

    PubMed

    Farina, Roberto; Simonelli, Anna; Rizzi, Alessandro; Pramstraller, Mattia; Cucchi, Alessandro; Trombelli, Leonardo

    2013-07-01

    This study aims to evaluate the early postoperative healing of papillary incision wounds and its association with (1) patient/site-related factors and technical (surgical) aspects as well as with (2) 6-month clinical outcomes following buccal single flap approach (SFA) in the treatment of intraosseous periodontal defects. Forty-three intraosseous defects in 35 patients were accessed with a buccal SFA alone or in combination with a reconstructive technology (graft, enamel matrix derivative (EMD), graft + EMD, or graft + membrane). Postoperative healing was evaluated at 2 weeks using the Early Wound-Healing Index (EHI). EHI ranged from score 1 (i.e., complete flap closure and optimal healing) to score 4 (i.e., loss of primary closure and partial tissue necrosis). SFA resulted in a complete wound closure at 2 weeks in the great majority of sites. A significantly more frequent presence of interdental contact point and interdental soft tissue crater, and narrower base of the interdental papilla were observed at sites with either EHI > 1 or EHI = 4 compared to sites with EHI = 1. No association between EHI and the 6-month clinical outcomes was observed. At 2 weeks, buccal SFA may result in highly predictable complete flap closure. Site-specific characteristics may influence the early postoperative healing of the papillary incision following SFA procedure. Two-week soft tissue healing, however, was not associated with the 6-month clinical outcomes.

  16. Multicriteria approach to interpret the variability of the levels of particulate matter and gaseous pollutants in the Madrid metropolitan area, during the 1999-2012 period

    NASA Astrophysics Data System (ADS)

    Salvador, P.; Artíñano, B.; Viana, M. M.; Alastuey, A.; Querol, X.

    2015-05-01

    The evolution of the mean levels of particulate matter (PM) and gaseous pollutants recorded in the Madrid metropolitan area from 1999 to 2012, were investigated focussing on the impact of mitigation strategies and economic scenarios. Temporal trends have shown that SO2, CO, NO, PM10 and NO2 levels at Madrid kerbside and urban-background sites have been decreasing over the 1999-2012 period, with statistical significance. A small contribution to the annual decreasing rates of SO2, NO and NO2 obtained at these sites could be attributed to the reduction in the regional background levels. The reduction in the emissions of atmospheric pollutants from specific sources of the urban agglomeration, explained most of the annual decreasing rates obtained at the kerbside and urban-background sites. From 1999 to 2007 a reduction of the emissions from road traffic and residential heating was produced, as a consequence of the implementation of a number of management strategies promoted and adopted by European and national public administrations. In contrast, from 2008 to 2012 a deep decrease in fuel consumption and a reduction of construction-demolition and roadwork activities took place in the Madrid metropolitan area, as a consequence of the economic recession. The expected overcoming of the economic crisis within the next few years, will presumably give rise to similar levels of PM and gaseous pollutants as those existing previously to the crisis period. The introduction of new Euro 6/VI vehicles which emit considerably less NOx than previous generation diesel vehicles, as well as the implementation of strategies aimed at reducing resuspended mineral dust from road traffic and construction-demolition activities are thus encouraged.

  17. 300 Area waste acid treatment system closure plan. Revision 1

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1996-03-01

    This section provides a description of the Hanford Site, identifies the proposed method of 300 Area Waste Acid Treatment System (WATS) closure, and briefly summarizes the contents of each chapter of this plan.

  18. Universal Three-Qubit Entanglement Generation Based on Linear Optical Elements and Quantum Non-Demolition Detectors

    NASA Astrophysics Data System (ADS)

    Liu, Xin-Chang

    2017-02-01

    Recently, entanglement plays an important role in quantum information science. Here we propose an efficient and applicable method which transforms arbitrary three-qubit unknown state to a maximally entangled Greenberger-Horne-Zeilinger state, and the proposed method could be further generalized to multi-qubit case. The proposed setup exploits only linear optical elements and quantum non-demolition detectors using cross-Kerr media. As the quantum non-demolition detection could reveal us the output state of the photons without destroying them. This property may make our proposed setup flexible and can be widely used in current quantum information science and technology.

  19. Closure Report for Corrective Action Unit 516: Septic Systems and Discharge Points

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NSTec Environmental Restoration

    Corrective Action Unit (CAU) 516 is located in Areas 3, 6, and 22 of the Nevada Test Site. CAU 516 is listed in the Federal Facility Agreement and Consent Order of 1996 as Septic Systems and Discharge Points, and is comprised of six Corrective Action Sites (CASs): {sm_bullet} CAS 03-59-01, Bldg 3C-36 Septic System {sm_bullet} CAS 03-59-02, Bldg 3C-45 Septic System {sm_bullet} CAS 06-51-01, Sump and Piping {sm_bullet} CAS 06-51-02, Clay Pipe and Debris {sm_bullet} CAS 06-51-03, Clean Out Box and Piping {sm_bullet} CAS 22-19-04, Vehicle Decontamination Area The Nevada Division of Environmental Protection (NDEP)-approved corrective action alternative for CASsmore » 06-51-02 and 22-19-04 is no further action. The NDEP-approved corrective action alternative for CASs 03-59-01, 03-59-02, 06-51-01, and 06-51-03 is clean closure. Closure activities included removing and disposing of total petroleum hydrocarbon (TPH)-impacted septic tank contents, septic tanks, distribution/clean out boxes, and piping. CAU 516 was closed in accordance with the NDEP-approved CAU 516 Corrective Action Plan (CAP). The closure activities specified in the CAP were based on the recommendations presented in the CAU 516 Corrective Action Decision Document (U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office, 2004). This Closure Report documents CAU 516 closure activities. During closure activities, approximately 186 tons of hydrocarbon waste in the form of TPH-impacted soil and debris, as well as 89 tons of construction debris, were generated and managed and disposed of appropriately. Waste minimization techniques, such as field screening of soil samples and the utilization of laboratory analysis to characterize and classify waste streams, were employed during the performance of closure work.« less

  20. Quantum non demolition measurement of cyclotron excitations in a Penning trap

    NASA Technical Reports Server (NTRS)

    Marzoli, Irene; Tombesi, Paolo

    1993-01-01

    The quantum non-demolition measurement of the cyclotron excitations of an electron confined in a Penning trap could be obtained by measuring the resonance frequency of the axial motion, which is coupled to the cyclotron motion through the relativistic shift of the electron mass.

  1. 40 CFR 98.468 - Definitions.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... GREENHOUSE GAS REPORTING Industrial Waste Landfills § 98.468 Definitions. Except as provided below, all terms... and demolition (C&D) waste landfill means a solid waste disposal facility subject to the requirements of subparts A or B of part 257 of this chapter that receives construction and demolition waste and...

  2. Corrective Action Decision Document/Closure Report for Corrective Action Unit 383: Area E-Tunnel Sites, Nevada Test Site

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NSTec Environmental Restoration

    This Corrective Action Decision Document/Closure Report (CADD/CR) was prepared by the Defense Threat Reduction Agency (DTRA) for Corrective Action Unit (CAU) 383, Area 12 E-Tunnel Sites, which is the joint responsibility of DTRA and the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office (NNSA/NSO). This CADD/CR is consistent with the requirements of the Federal Facility Agreement and Consent Order (FFACO) agreed to by the State of Nevada, the DOE, and the U.S. Department of Defense. Corrective Action Unit 383 is comprised of three Corrective Action Sites (CASs) and two adjacent areas: • CAS 12-06-06, Muckpile •more » CAS 12-25-02, Oil Spill • CAS 12-28-02, Radioactive Material • Drainage below the Muckpile • Ponds 1, 2, and 3 The purpose of this CADD/CR is to provide justification and documentation to support the recommendation for closure with no further corrective action, by placing use restrictions at the three CASs and two adjacent areas of CAU 383.« less

  3. Sixteen-week analysis of unaltered elastomeric chain relating in-vitro force degradation with in-vivo extraction space tooth movement.

    PubMed

    Evans, Kristin S; Wood, Cory M; Moffitt, Allen H; Colgan, John A; Holman, J Kevin; Marshall, Steven D; Pope, D Spencer; Sample, Lew B; Sherman, Stephen L; Sinclair, Peter M; Trulove, Tim S

    2017-04-01

    The purposes of this study were to evaluate whether unaltered elastomeric chain can continue to move teeth for 16 weeks and to relate it to the amount of force remaining for the same batch of elastomeric chains. The in-vivo portion of the study had a sample of 30 paired extraction space sites from 22 subjects who were measured for closure of the space every 28 days. The altered side elastomeric chain served as the control and was replaced at 28-day intervals whereas the experimental side remained unaltered. In the in-vitro portion of the study, 100 each of 2-unit and 3-unit segments of the same batch of elastomeric chains were placed in a water bath, and the force was measured for 20 of each segment length at the 28-day measurement points. Statistically significant amounts of space closure occurred at both the altered and unaltered sites at all measurement time points. The mean space closure at the altered sites was minimally greater than that observed at the paired unaltered sites. The mean differences of space closure between the altered and unaltered sites ranged from a minimum of -0.05 mm at 4 weeks to a maximum of -0.14 mm at 8 weeks. The elastomeric chain force degraded rapidly by 4 weeks but continued a gradual diminution of force to 86 g at 16 weeks. Unaltered elastomeric chain continued to move teeth into extraction spaces for 16 weeks in this sample from both statistically and clinically significant standpoints. There were minimal and statistically insignificant differences in the mean space closure measurements between the paired altered and unaltered sites. The elastomeric chain force at 16 weeks was less than 100 g, yet at the same time point, teeth continued to move clinically. Copyright © 2016 American Association of Orthodontists. Published by Elsevier Inc. All rights reserved.

  4. The healing effects of autologous platelet gel on acute human skin wounds.

    PubMed

    Hom, David B; Linzie, Bradley M; Huang, Trevor C

    2007-01-01

    To compare the healing of full-thickness skin punch wounds treated with topical autologous platelet gel (APG) vs conventional therapy (antibiotic ointment and/or occlusive dressings) in healthy volunteers. A prospective, single-blind, pilot study comprising 80 full-thickness skin punch wounds (4 mm diameter) was conducted on the thighs of 8 healthy volunteers. With each subject serving as his or her own control (5 punch sites per leg), APG was applied topically on one thigh, and an antibiotic ointment and/or a semiocclusive dressing was applied on the other thigh. Healing was monitored for spontaneous wound closure by clinical assessment and by digital photographs over 6 months. Over 35 days, 64 serial dermal biopsy specimens (6 mm diameter) were analyzed (using hematoxylin-eosin, Mason trichrome, CD-34, and Ki-67 stains) to measure differences between treated and control sites for cellularity, granulation formation, vascularity, epithelialization, and cellular replication. Over a 42-day period, the APG-treated sites had statistically increased wound closure compared with controls by visual clinical assessment and by digital planimetry photographic measurements (P

  5. 77 FR 49722 - Cranes and Derricks in Construction: Demolition and Underground Construction

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-17

    ... cranes rule, OSHA prepared a final economic analysis (FEA) as required by the Occupational Safety and... construction work involving demolition. The FEA for the final cranes standard, which included all cranes, crane... were technologically and economically feasible. Because the FEA drew these conclusions from...

  6. A&M. Outdoor turntable. Workings and design exposed during demolition. View ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    A&M. Outdoor turntable. Workings and design exposed during demolition. View between two of the four rails of the track. Note motor and electrical conduit. Date: February 3, 2003. INEEL negative no. HD-37-1-1 - Idaho National Engineering Laboratory, Test Area North, Scoville, Butte County, ID

  7. 48 CFR 46.313 - Contracts for dismantling, demolition, or removal of improvements.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Contracts for dismantling, demolition, or removal of improvements. 46.313 Section 46.313 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION CONTRACT MANAGEMENT QUALITY ASSURANCE Contract Clauses 46.313 Contracts for dismantling...

  8. ASBESTOS RELEASE FROM THE DEMOLITION OF TWO SCHOOLS IN FAIRBANKS, ALASKA

    EPA Science Inventory

    Two elementary schools on Fort Wainwright Army Base in Fairbanks, Alaska were demolished during the Summer of 1992. rior to demolition, all friable asbestos was removed from the buildings in accordance with the applicable U.S. EPA's asbestos NESHAP. he primary objective of the st...

  9. 126. DETAIL OF NORTH PLANT AMMUNITION DEMOLITION FACILITY, WITH ASSEMBLY ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    126. DETAIL OF NORTH PLANT AMMUNITION DEMOLITION FACILITY, WITH ASSEMBLY PLANT/WAREHOUSE (BUILDING 1601/1606/1701) IN BACKGROUND, FROM GB MANUFACTURING PLANT. VIEW TO NORTHWEST. - Rocky Mountain Arsenal, Bounded by Ninety-sixth Avenue & Fifty-sixth Avenue, Buckley Road, Quebec Street & Colorado Highway 2, Commerce City, Adams County, CO

  10. 125. NORTH PLANT AMMUNITION DEMOLITION FACILITY IN FOREGROUND AND ASSEMBLY ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    125. NORTH PLANT AMMUNITION DEMOLITION FACILITY IN FOREGROUND AND ASSEMBLY PLANT/WAREHOUSE (BUILDING 1601/1606/1701) IN BACKGROUND. FROM GB MANUFACTURING PLANT. VIEW TO NORTHWEST. - Rocky Mountain Arsenal, Bounded by Ninety-sixth Avenue & Fifty-sixth Avenue, Buckley Road, Quebec Street & Colorado Highway 2, Commerce City, Adams County, CO

  11. 3718-F Alkali Metal Treatment and Storage Facility Closure Plan. Revision 1

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    The Hanford Site, located northwest of the city of Richland, Washington, houses reactors, chemical-separation systems, and related facilities used for the production of special nuclear materials, as well as for activities associated with nuclear energy development. The 300 Area of the Hanford Site contains reactor fuel manufacturing facilities and several research and development laboratories. The 3718-F Alkali Metal Treatment and Storage Facility (3718-F Facility), located in the 300 Area, was used to store and treat alkali metal wastes. Therefore, it is subject to the regulatory requirements for the storage and treatment of dangerous wastes. Closure will be conducted pursuant tomore » the requirements of the Washington Administrative Code (WAC) 173-303-610 (Ecology 1989) and 40 CFR 270.1. Closure also will satisfy the thermal treatment facility closure requirements of 40 CFR 265.381. This closure plan presents a description of the 3718-F Facility, the history of wastes managed, and the approach that will be followed to close the facility. Only hazardous constituents derived from 3718-F Facility operations will be addressed.« less

  12. Closure Report for Corrective Action Unit 426: Cactus Spring Waste Trenches, Tonopah Test Range, Nevada

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Dave Madsen

    This Closure Report provides the documentation for closure of the Cactus Spring Waste Trenches Corrective Action Unit (CAU) 426. The site is located on the Tonopah Test Range, approximately 225 kilometers northwest of Las Vegas, NV. CAU 426 consists of one corrective action site (CAS) which is comprised of four waste trenches. The trenches were excavated to receive solid waste generated in support of Operation Roller Coaster, primary the Double Tracks Test in 1963, and were subsequently backfilled. The Double Tracks Test involved use of live animals to assess the biological hazards associated with the nonnuclear detonation of plutonium-bearing devices.more » The Nevada Division of Environmental Protection approved Corrective Action Plan (CAP)which proposed ''capping'' methodology. The closure activities were completed in accordance with the approved CAP and consisted of constructing an engineered cover in the area of the trenches, constructing/planting a vegetative cover, installing a perimeter fence and signs, implementing restrictions on future use, and preparing a Post-Closure Monitoring Plan.« less

  13. Significant skin-tightening by closure of fractional ablative laser holes.

    PubMed

    Russe, Elisabeth; Purschke, Martin; Limpiangkanan, Wikunda; Farinelli, William A; Wang, Ying; Doukas, Apostolos G; Sakamoto, Fernanda H; Wechselberger, Gottfried; Anderson, Richard Rox

    2018-01-01

    Ablative fractional laser treatment uses thousands of very small laser beam wounds to damage a fraction of the skin, which stimulates tissue remodeling. Each open micro-wound heals without scarring, but the amount of skin tightening achieved is limited. This animal study was performed to test the hypothesis that immediate temporary closure of fractional laser wounds could increase skin tightening after fractional ablative laser treatment. Four adult swine were used for the study; 98 square test sites (3 × 3 cm) were tattooed on the abdomen and flanks of each pig. An ablative fractional Erbium:YAG laser (Sciton Profile, Sciton Inc, Palo Alto, CA) was used to treat the test areas. A laser micro-spot fluence of 375 J/cm 2 was delivered in 150-250 microseconds pulses, resulting in an array of ablation channels extending 1.5 mm deep into the skin, with a spot size of 250 µm, with 10% treatment density. Immediately following laser exposure the resulting holes were closed using a stretched elastic adhesive dressing, which, when applied, recoiled and compressed the diameter of the ablation holes. The compressive dressings were removed after 7 days. This procedure was compared to removing the same amount of skin (10%) mechanically by specially designed 19 gauge coring needles, as well as to the same laser and coring methods without compression closure. Area and shape of test sites were measured by digital photography before and 28 days after treatment. Data analysis included compensation for animal growth, as measured by increase in the area of the untreated control sites. All treated and control sites healed within a week, without scarring evident at 28 days. Laser treatment combined with compressive wound closure caused significant shrinkage at 28 days compared with untreated control sites. The treated skin area was reduced by 11.5% (P = 0.0001). Needle coring with wound closure produced similar, significant shrinkage (8%, P < 0.0021), whereas laser and needle coring treatment without closure did not result in significant area reduction (P = 0.1289) compared with untreated control sites. Significant skin tightening can be achieved by immediate temporary non-invasive wound closure after short pulse Er:YAG fractional ablative laser treatment, as well as after mechanically removing skin with a coring needle. This approach may improve skin tightening after ablative laser treatments. Further clinical studies are necessary to confirm successful application in humans. Lasers Surg. Med. 50:64-69, 2018. © 2017 Wiley Periodicals, Inc. © 2017 Wiley Periodicals, Inc.

  14. Reduced sulfur compounds in gas from construction and demolition debris landfills.

    PubMed

    Lee, Sue; Xu, Qiyong; Booth, Matthew; Townsend, Timothy G; Chadik, Paul; Bitton, Gabriel

    2006-01-01

    The biological conversion of sulfate from disposed gypsum drywall to hydrogen sulfide (H(2)S) in the anaerobic environment of a landfill results in odor problems and possible health concerns at many disposal facilities. To examine the extent and magnitude of such emissions, landfill gas samples from wells, soil vapor samples from the interface of the waste and cover soil, and ambient air samples, were collected from 10 construction and demolition (C&D) debris landfills in Florida and analyzed for H(2)S and other reduced sulfur compounds (RSC). H(2)S was detected in the well gas and soil vapor at all 10 sites. The concentrations in the ambient air above the surface of the landfill were much lower than those observed in the soil vapor, and no direct correlation was observed between the two sampling locations. Methyl mercaptan and carbonyl sulfide were the most frequently observed other RSC, though they occurred at smaller concentrations than H(2)S. This research confirmed the presence of H(2)S at C&D debris landfills. High concentrations of H(2)S may be a concern for employees working on the landfill site. These results indicate that workers should use proper personal protection at C&D debris landfills when involved in excavation, landfill gas collection, or confined spaces. The results indicate that H(2)S is sufficiently diluted in the atmosphere to not commonly pose acute health impacts for these landfill workers in normal working conditions. H(2)S concentrations were extremely variable with measurements occurring over a very large range (from less than 3 ppbv to 12,000 ppmv in the soil vapor and from less than 3 ppbv to 50 ppmv in ambient air). Possible reasons for the large intra- and inter-site variability observed include waste and soil heterogeneities, impact of weather conditions, and different site management practices.

  15. Role of Groundwater Monitoring for Closure of Underground Nuclear Tests on the Nevada Test Site

    NASA Astrophysics Data System (ADS)

    Chapman, J. B.; Pohlmann, K.; Pohll, G.; Russell, C.

    2009-12-01

    Over 800 underground nuclear tests were conducted at the Nevada Test Site in a variety of hydrogeologic environments. As of the 1996 Environmental Impact Statement for the site, more than 100 million curies of radioactivity remained in the subsurface from these tests, much of it near or below the water table. The U.S. Department of Energy Environmental Management program is implementing a closure strategy for these sites that anticipates closure-in-place, natural attenuation, and institutional controls. Groundwater monitoring is a key component of this strategy, but its role is significantly evolved from that of a detection- or compliance-based monitoring concept. Indeed, monitoring is part of the integrated closure process itself, not an activity confined to a static post-closure period. The reasons for this evolution derive from the complex hydrogeologic conditions, the long time-frames of concern, and recognition that a significant degree of uncertainty is irreducible. The hundreds of test locations are grouped into Corrective Action Units that measure over 100 km2 in area and extend to depths in excess of 1000 m. Despite concerted data collection efforts, the technical basis for closure of these large regions relies heavily on complex numerical models of flow and transport. The inherent uncertainties in these models present challenges for reaching regulatory acceptance of closure, and challenges for confidently locating monitoring wells. The solution now being pursued for the NTS is to integrate model evaluation and monitoring. In addition to standard goals of contaminant detection and protection of human health, an explicit monitoring objective is to increase confidence in model results by assessing the reliability of model forecasts. The initial monitoring network is expected to eventually transition to a long-term closure design, with less emphasis on confidence-building as uncertainty in forecasts is reduced. The methodology for this iterative process of monitoring and model refinement will incorporate expert-judgment and Bayesian updating of model input parameters to provide a cost-beneficial monitoring network that is expected to reduce model prediction uncertainty. This approach to monitoring for these large and complex contaminant areas is consistent with the underlying reliance on model predictions and will ensure that water quality samples are collected in a manner and location that is consistent with the current understanding of contaminant flowpaths.

  16. Secure closure of the tracheal incision after natural orifice transluminal endoscopic surgery with a surgical sealant (CoSeal).

    PubMed

    Liu, Yun-Hen; Wu, Yi-Cheng; Chen, Tzu-Ping; Ko, Po-Jen

    2011-09-01

    To evaluate the effectiveness of surgical sealant (CoSeal) in sealing the tracheal assess sites after transtracheal thoracoscopy. Two dogs underwent transtracheal thoracic exploration and pericardial window creation. The thoracic cavity was approached with flexible bronchoscope through a 9-mm tracheal incision. The pericardial window was performed with a needle knife via the working channel of the bronchoscope, and the tracheal assess site was closed with CoSeal using a rubber catheter. The integrity of tracheal healing was evaluated under positive pressure ventilation. Transtracheal creation of pericardial window and closure of tracheal incision with CoSeal was successfully performed in both dogs. There was no evidence of air leaks from the chest tube during positive pressure ventilation. Autopsy revealed no injury to the mediastinum and intrathoracic structure. Endoscopic closure of tracheal access site of NOTES with CoSeal appears to be a feasible technique.

  17. Quantifying construction and demolition waste: an analytical review.

    PubMed

    Wu, Zezhou; Yu, Ann T W; Shen, Liyin; Liu, Guiwen

    2014-09-01

    Quantifying construction and demolition (C&D) waste generation is regarded as a prerequisite for the implementation of successful waste management. In literature, various methods have been employed to quantify the C&D waste generation at both regional and project levels. However, an integrated review that systemically describes and analyses all the existing methods has yet to be conducted. To bridge this research gap, an analytical review is conducted. Fifty-seven papers are retrieved based on a set of rigorous procedures. The characteristics of the selected papers are classified according to the following criteria - waste generation activity, estimation level and quantification methodology. Six categories of existing C&D waste quantification methodologies are identified, including site visit method, waste generation rate method, lifetime analysis method, classification system accumulation method, variables modelling method and other particular methods. A critical comparison of the identified methods is given according to their characteristics and implementation constraints. Moreover, a decision tree is proposed for aiding the selection of the most appropriate quantification method in different scenarios. Based on the analytical review, limitations of previous studies and recommendations of potential future research directions are further suggested. Copyright © 2014 Elsevier Ltd. All rights reserved.

  18. Corrective Action Decision Document/Corrective Action Plan for Corrective Action Unit 547: Miscellaneous Contaminated Waste Sites, Nevada National Security Site, Nevada, Revision 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Mark Krauss

    2011-09-01

    The purpose of this CADD/CAP is to present the corrective action alternatives (CAAs) evaluated for CAU 547, provide justification for selection of the recommended alternative, and describe the plan for implementing the selected alternative. Corrective Action Unit 547 consists of the following three corrective action sites (CASs): (1) CAS 02-37-02, Gas Sampling Assembly; (2) CAS 03-99-19, Gas Sampling Assembly; and(3) CAS 09-99-06, Gas Sampling Assembly. The gas sampling assemblies consist of inactive process piping, equipment, and instrumentation that were left in place after completion of underground safety experiments. The purpose of these safety experiments was to confirm that a nuclearmore » explosion would not occur in the case of an accidental detonation of the high-explosive component of the device. The gas sampling assemblies allowed for the direct sampling of the gases and particulates produced by the safety experiments. Corrective Action Site 02-37-02 is located in Area 2 of the Nevada National Security Site (NNSS) and is associated with the Mullet safety experiment conducted in emplacement borehole U2ag on October 17, 1963. Corrective Action Site 03-99-19 is located in Area 3 of the NNSS and is associated with the Tejon safety experiment conducted in emplacement borehole U3cg on May 17, 1963. Corrective Action Site 09-99-06 is located in Area 9 of the NNSS and is associated with the Player safety experiment conducted in emplacement borehole U9cc on August 27, 1964. The CAU 547 CASs were investigated in accordance with the data quality objectives (DQOs) developed by representatives of the Nevada Division of Environmental Protection (NDEP) and the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office. The DQO process was used to identify and define the type, amount, and quality of data needed to determine and implement appropriate corrective actions for CAU 547. Existing radiological survey data and historical knowledge of the CASs were sufficient to meet the DQOs and evaluate CAAs without additional investigation. As a result, further investigation of the CAU 547 CASs was not required. The following CAAs were identified for the gas sampling assemblies: (1) clean closure, (2) closure in place, (3) modified closure in place, (4) no further action (with administrative controls), and (5) no further action. Based on the CAAs evaluation, the recommended corrective action for the three CASs in CAU 547 is closure in place. This corrective action will involve construction of a soil cover on top of the gas sampling assembly components and establishment of use restrictions at each site. The closure in place alternative was selected as the best and most appropriate corrective action for the CASs at CAU 547 based on the following factors: (1) Provides long-term protection of human health and the environment; (2) Minimizes short-term risk to site workers in implementing corrective action; (3) Is easily implemented using existing technology; (4) Complies with regulatory requirements; (5) Fulfills FFACO requirements for site closure; (6) Does not generate transuranic waste requiring offsite disposal; (7) Is consistent with anticipated future land use of the areas (i.e., testing and support activities); and (8) Is consistent with other NNSS site closures where contamination was left in place.« less

  19. Health assessment for Lake Sandy Jo Landfill, Gary, Indiana, Region 5. CERCLIS No. IND980500524. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1985-11-21

    The 50-acre Lake Sandy Jo Landfill is located in the Black Oak community (predominantly residential) of southwestern Gary in Lake County, Indiana. From about 1971 until about 1980, the lake was filled in with construction and demolition debris, municipal garbage, industrial wastes, hazardous materials, and possibly drummed wastes. These wastes are partly to completely exposed on the landfill surface. Surface soil, subsurface soil, surface water, sediment, and ground water show a variety of metal and organic chemical carcinogens. Toxic noncarcinogen priority pollutants found were chloromethane, copper, cyanide, lead, mercury, and silver. Inorganic soil levels found on the site for leadmore » and cadmium exceed levels of concern that would permit unrestricted use of the site. Remedial measures would be necessary before the site could be granted unrestricted use.« less

  20. 77 FR 49741 - Cranes and Derricks in Construction: Demolition and Underground Construction

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-17

    ... Analysis When it issued the final cranes rule, OSHA prepared a final economic analysis (FEA) as required by... construction and cranes engaged in construction work involving demolition. The FEA for the final cranes..., found that the requirements of the rule were technologically and economically feasible. Because the FEA...

  1. Spray and dust hang in the air, as the demolition ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Spray and dust hang in the air, as the demolition is completed. Only the southeast pier remains standing at right. View is to southeast from confluence of Trinity and South Fork Trinity Rivers - South Fork Trinity River Bridge, State Highway 299 spanning South Fork Trinity River, Salyer, Trinity County, CA

  2. Methodology to Estimate the Quantity, Composition, and Management of Construction and Demolition Debris in the United States

    EPA Science Inventory

    This report, Methodology to Estimate the Quantity, Composition and Management of Construction and Demolition Debris in the US, was developed to expand access to data on CDD in the US and to support research on CDD and sustainable materials management. Since past US EPA CDD estima...

  3. Residential demolition and its impact on vacant lot hydrology: implications for the management of stormwater and sewer system overflows

    EPA Science Inventory

    Increased residential demolitions have made vacant lots a ubiquitous feature of the contemporary urban landscape. Vacant lots may provide ecosystem services such as stormwater runoff capture, but the extent of these functions will be regulated by soil hydrology. We evaluated soil...

  4. HEAVY METALS IN RECOVERED FINES FOR CONSTRUCTION AND DEMOLITION DEBRIS RECYCLING FACILITIES IN FLORIDA

    EPA Science Inventory

    A major product recovered from the processing and recycling of construction and demolition (C&D) debris is screened soil, also referred to as fines. A proposed reuse option for C&D debris fines is fill material, typically in construction projects as a substitute for natural soil....

  5. 24 CFR 970.15 - Specific criteria for HUD approval of demolition requests.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... HOUSING PROJECTS § 970.15 Specific criteria for HUD approval of demolition requests. (a) In addition to... public housing project must certify that the project: (1) Is obsolete as to physical condition, location... modifications is cost-effective to return the public housing project or portion of the project to useful life...

  6. 78 FR 29648 - Regulated Navigation Area; Waldo-Hancock Bridge Demolition, Penobscot River, Between Prospect and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-21

    ... 1625-AA11 Regulated Navigation Area; Waldo-Hancock Bridge Demolition, Penobscot River, Between Prospect... River between Prospect and Verona, ME, under and surrounding the Waldo- Hancock Bridge in order to facilitate the removal of the trusses, cables, and towers of the Waldo-Hancock Bridge. This temporary final...

  7. Comparison of the Alternative Asbestos Control Method and the NESHAP Method for Demolition of Asbestos-Containing Buildings

    EPA Science Inventory

    The Asbestos NESHAP (National Emission Standard for Hazardous Air Pollutants) requires the removal of all Regulated Asbestos-Containing Material (RACM) prior to the demolition of the buildings that fall under the auspices of the NESHAP. This removal process can be a costly and ti...

  8. 10 CFR 960.5-1 - System guidelines.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... REPOSITORY Preclosure Guidelines § 960.5-1 System guidelines. (a) Qualifying conditions—(1) Preclosure... radioactive materials to restricted and unrestricted areas during repository operation and closure shall meet... repository siting, construction, operation, closure, and decommissioning the public and the environment shall...

  9. Performance and durability of concrete made with demolition waste and artificial fly ash-clay aggregates

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Zakaria, M.; Cabrera, J.G.

    1996-12-31

    Demolition aggregates and artificial aggregates made with waste materials are two alternatives being studied for replacement of natural aggregates in the production of concrete. Natural aggregate sources in Europe are increasingly scarce and subject to restrictions based on environmental regulations. In many areas of the developing world sources of good quality aggregates are very limited or practically not available and therefore it has become necessary to study alternative materials. This paper presents a laboratory study on the use of demolition bricks and artificial aggregates made from fly ash-clay as coarse aggregates to make concrete. The concretes made either with demolitionmore » bricks or artificial aggregates are compared with a control mix made with natural gravel aggregates. The strength and durability characteristics of these concretes are evaluated using as a criteria compressive strength and transport properties, such as gas and water permeability. The results show clearly that concretes of good performance and durability can be produced using aggregates from demolition rubble or using artificial aggregates made with wastes such as fly ash.« less

  10. Port closure techniques.

    PubMed

    Shaher, Z

    2007-08-01

    Laparoscopic trocars do create wounds. This article aims to review and list different techniques used for closure of the fascia incision at trocar sites. A literature search was performed for articles dealing with closure techniques. The author searched this subject in English on Medline by combining the words "trocar" and "hernia," as well as "Deschamps" and "Reverdin." All articles reporting techniques with their references were reviewed. The articles described many techniques in addition to classical closure using curved needles, including Grice needle, Maciol needles, Endoclose device, Carter-Thomason device, Tahoe ligature device, Endo-Judge device, eXit puncture closure device, Lowsley retractor, spinal cord needles, dual hemostat, suture carrier, Riverdin and Deschamps needles, and Gore-Tex closure device. Three main groups of techniques were found with favor of extracorporeal manipulations under direct visualization. Old methods are sufficient and cost-effective.

  11. Closure Report for Corrective Action Unit 5: Landfills, Nevada Test Site, Nevada, Revision 0 with Errata Sheet and ROTC 1

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None, None

    The purpose of this CR is to document that the closure of CAU 5 complied with the NDEP-approved CAP closure requirements (NNSA/NSO, 2004). The closure activities specified in the CAP were based on the recommendations presented in the corrective action decision document (CADD) (NNSA/NSO, 2003). ROTC 1: The UR form was updated to the current format to include a. more detailed description of the UR and maintenance requirements. Information was edited due to the change of UR signs at the site to UR monuments/signs. The maintenance frequency was changed to annually because sign damage due to high winds was evidencedmore » during recent site inspections. The coordinates for the UR were originally based on NAD 27 and were modified to NAD 83 to comply with the most recent M&O database requirements. The modifications identified in this ROTC will supersede the existing posting requirements for the UR at CASs 06-1S-02 and 06-15-03 as identified in the CAU 5 CADD; CAU 5 CR; and the UR form associated with CASs 06-15-02 and 06-15-03.« less

  12. Strategy of Construction and Demolition Waste Management after Chemical Industry Facilities Removal

    NASA Astrophysics Data System (ADS)

    Tashkinova, I. N.; Batrakova, G. M.; Vaisman, Ya I.

    2017-06-01

    Mixed waste products are generated in the process of irrelevant industrial projects’ removal if conventional techniques of their demolition and dismantling are applied. In Russia the number of unused chemical industry facilities including structures with high rate of wear is growing. In removing industrial buildings and production shops it is used conventional techniques of demolition and dismantling in the process of which mixed waste products are generated. The presence of hazardous chemicals in these wastes makes difficulties for their use and leads to the increasing volume of unutilized residues. In the process of chemical industry facilities’ removal this fact takes on special significance as a high level of hazardous chemicals in the waste composition demands for the realization of unprofitable measures aimed at ensuring environmental and industrial safety. The proposed strategy of managing waste originated from the demolition and dismantling of chemical industry facilities is based on the methodology of industrial metabolism which allows identifying separate material flows of recycled, harmful and ballast components, performing separate collection of components during removal and taking necessary preventive measures. This strategy has been tested on the aniline synthesis plant being in the process of removal. As a result, a flow of 10 wt. %, subjected to decontamination, was isolated from the total volume of construction and demolition waste (C&D waste). The considered approach allowed using the resource potential of more than 80wt. % of waste and minimizing the disposed waste volume.

  13. Downcycling versus recycling of construction and demolition waste: Combining LCA and LCC to support sustainable policy making.

    PubMed

    Di Maria, Andrea; Eyckmans, Johan; Van Acker, Karel

    2018-05-01

    Urgent solutions are needed in Europe to deal with construction and demolition waste (CDW). EU policy has contributed to significantly reducing the amount of CDW going to landfill, but most of the effort has been put in downcycling practices. Therefore, further policies are needed to stimulate high-quality recycling of CDW. The present paper presents a combined life cycle assessment (LCA) and life cycle costing (LCC) methodologies to analyse the environmental and the economic drivers in four alternative CDW end-of-life scenarios in the region of Flanders, in Belgium. The four analysed alternatives are (i) landfilling, (ii) downcycling, (iii) advanced recycling and (iv) recycling after selective demolition. LCA results show that landiflling is the scenario having the highest environmental impacts in terms of person equivalent (PE), followed by downcycling and recycling (-36%) and recycling after selective demolition (-59%). The decrease in environmental impacts is mostly due to the avoided landfilling of CDW and the recovery of materials from selective demolition. LCC results indicate that landfilling is the scenario bearing the highest total economic costs. This is due to the high landfill tax in Flanders. The recycling after selective demolition bears the second highest cost. The increase of high-quality CDW recycling can significantly reduce the overall environmental impact of the system. Implementing a high landfill tax, increasing the gate fee to the recycling plant, and boosting the sales price of recycled aggregates are the most effective drivers to facilitate a transition towards a more sustainable CDW management system. The paper demonstrates that the combined LCA and LCC results can highlight the environmental and economic drivers in CDW management. The results of the combined analysis can help policymakers to promote the aspects contributing to sustainability and to limit the ones creating a barrier. Copyright © 2018 Elsevier Ltd. All rights reserved.

  14. Silver-coated nylon dressing plus active DC microcurrent for healing of autogenous skin donor sites.

    PubMed

    Malin, Edward W; Galin, Chaya M; Lairet, Kimberley F; Huzar, Todd F; Williams, James F; Renz, Evan M; Wolf, Steven E; Cancio, Leopoldo C

    2013-11-01

    Burn wounds are a significant cause of morbidity and mortality, and improved outcomes are demonstrated with early closure of both primary burn wounds and skin donor sites. Thus, technology that decreases the healing time of burns and donor sites would be potentially lifesaving. We present the results of a single-center, prospective, double-blinded, randomized controlled trial to evaluate the efficacy of silver-coated dressing with active microcurrent in comparison to silver-coated dressing with sham microcurrent on wound-closure time for autogenous skin donor sites. Four hundred five patients were screened for treatment of their donor sites using a silver-coated nylon dressing with either sham or active microcurrent stimulation. Thirty patients were enrolled in the study and then randomized. Of these, 5 patients were removed from analysis due to protocol deviations. Differences in time-to-closure were analyzed using Kaplan-Meier analysis and the proportional hazard regression model. Subjective verbal pain rating scores (0-10; 0, no pain; 10, worst pain) were also recorded. All devices were blinded and programmed at an outside facility, so that every patient had either an active or sham device. The study was unblinded only after the final patient's donor site had healed. All patients achieved donor-site healing before postoperative day 20. The 14 patients in the active microcurrent group [mean, 10.8 (2.9) days; range, 7-15 days] experienced no difference in time to wound healing as compared to the remaining patients in the sham microcurrent group [mean, 11.1 (2.0) days; range, 8-14 days; P = 0.75]. There were no differences in pain from one group compared to the other. None of the donor sites exhibited clinical signs of infection. In a sample size of 25 burn patients, the addition of direct microcurrent to silver-nylon dressings did not decrease time to wound closure of skin donor sites, and it did not show a difference in reported pain levels.

  15. Lease Operations Environmental Guidance Document

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bureau of Land Management

    This report contains discussions in nine different areas as follows: (1) Good Lease Operating Practices; (2) Site Assessment and Sampling; (3) Spills/Accidents; (4) Containment and Disposal of Produced Waters; (5) Restoration of Hydrocarbon Impacted Soils; (6) Restoration of Salt Impacted Soils; (7) Pit Closures; (8) Identification, Removal and Disposal of Naturally Occurring Radioactive Materials (NORM); and (9) Site Closure and Construction Methods for Abandonment Wells/Locations. This report is primary directed towards the operation of oil and gas producing wells.

  16. Corrective Action Decision Document/Closure Report for Corrective Action Unit 477: Area 12 N-Tunnel Muckpile, Nevada Test Site

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NSTec Environmental Restoration

    This Corrective Action Decision Document (CADD)/Closure Report (CR) was prepared by the Defense Threat Reduction Agency (DTRA) for Corrective Action Unit (CAU) 477, N-Tunnel Muckpile. This CADD/CR is consistent with the requirements of the Federal Facility Agreement and Consent Order (FFACO) agreed to by the State of Nevada, the U.S. Department of Energy, and the U.S. Department of Defense. Corrective Action Unit 477 is comprised of one Corrective Action Site (CAS): • 12-06-03, Muckpile The purpose of this CADD/CR is to provide justification and documentation supporting the recommendation for closure with no further action, by placing use restrictions on CAUmore » 477.« less

  17. Design, permitting, and construction issues associated with closure of the Panna Maria uranium tailings impoundment

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Strachan, C.L.; Raabe, K.L.

    1997-12-31

    In 1992, Panna Maria Uranium Operations (PMUO) initiated licensing and engineering activities for closure of the Panna Maria mill and 150-acre tailings impoundment located in southeast Texas. Closure of the tailings impoundment is permitted by license amendment through the Texas Natural Resources Conservation Commission (TNRCC), and based on closure criteria outlined in Texas regulations. The closure plan for the Panna Maria tailings impoundment was submitted for Texas regulatory agency review in April 1993, with details of the closure plan modified in 1994, 1995, and 1996. The closure plan included a multi-layered cover over the regraded tailings surface which was designedmore » for long-term isolation of tailings, reduction of radon emanation to regulated levels, and reduction of infiltration to TNRCC-accepted levels. The cover and embankment slope surfaces and surrounding areas were designed to provide acceptable erosional stability as compared to runoff velocities from the Probable Maximum Precipitation event. Cover materials were selected from on-site materials and evaluated for suitability based on permeability, radon attenuation, and soil dispersivity characteristics. Off-site materials were used when necessary. The cover over the tailings has a maximum slope of 0.5 percent, and the regraded embankment slopes outside the perimeter of the impoundment have a maximum slope of 20 percent. All reclaimed slopes are covered with topsoil and revegetated. A riprap-lined channel is to be used to convey runoff from within the perimeter of the reclaimed impoundment to the north of the impoundment.« less

  18. Design and rationale of the AngioSeal versus the Radial approach In acute coronary SyndromE (ARISE) trial: a randomized comparison of a vascular closure device versus the radial approach to prevent vascular access site complications in non-ST-segment elevation acute coronary syndrome patients.

    PubMed

    de Andrade, Pedro Beraldo; E Mattos, Luiz Alberto Piva; Tebet, Marden André; Rinaldi, Fábio Salerno; Esteves, Vinícius Cardozo; Nogueira, Ederlon Ferreira; França, João Ítalo Dias; de Andrade, Mônica Vieira Athanazio; Barbosa, Robson Alves; Labrunie, André; Abizaid, Alexandre Antônio Cunha; Sousa, Amanda Guerra de Moraes Rego

    2013-12-18

    Arterial access is a major site of bleeding complications after invasive coronary procedures. Among strategies to decrease vascular complications, the radial approach is an established one. Vascular closure devices provide more comfort to patients and decrease hemostasis and need for bed rest. However, the inconsistency of data proving their safety limits their routine adoption as a strategy to prevent vascular complications, requiring evidence through adequately designed randomized trials. The aim of this study is to compare the radial versus femoral approach using a vascular closure device for the incidence of arterial puncture site vascular complications among non-ST-segment elevation acute coronary syndrome patients submitted to an early invasive strategy. ARISE is a national, multicenter, non-inferiority randomized clinical trial. Two hundred patients with non-ST-segment elevation acute coronary syndrome will be randomized to either radial or femoral access using a vascular closure device. The primary outcome is the occurrence of vascular complications at an arterial puncture site 30 days after the procedure, including major bleeding, retroperitoneal hematoma, compartment syndrome, hematoma ≥ 5 cm, pseudoaneurysm, arterio-venous fistula, infection, limb ischemia, arterial occlusion, adjacent nerve injury or the need for vascular surgical repair. Enrollment was initiated in September 2012, and until October 2013 91 patients were included. The inclusion phase is expected to last until the second half of 2014. The ARISE trial will help define the role of a vascular closure device as a bleeding avoidance strategy in patients with NSTEACS. ClinicalTrials.gov identifier: NCT01653587.

  19. Closure Report for the 92-Acre Area and Corrective Action Unit 111: Area 5 WMD Retired Mixed Waste Pits, Nevada National Security Site, Nevada

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NSTec Environmental Restoration

    2012-02-21

    This Closure Report (CR) presents information supporting closure of the 92-Acre Area, which includes Corrective Action Unit (CAU) 111, 'Area 5 WMD Retired Mixed Waste Pits.' This CR provides documentation supporting the completed corrective actions and confirmation that the closure objectives were met. This CR complies with the requirements of the Federal Facility Agreement and Consent Order (FFACO) (FFACO, 1996 [as amended March 2010]). Closure activities began in January 2011 and were completed in January 2012. Closure activities were conducted according to Revision 1 of the Corrective Action Decision Document/Corrective Action Plan (CADD/CAP) for the 92-Acre Area and CAU 111more » (U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office [NNSA/NSO], 2010). The following closure activities were performed: (1) Construct an engineered evapotranspiration cover over the boreholes, trenches, and pits in the 92-Acre Area; (2) Install use restriction (UR) warning signs, concrete monuments, and subsidence survey monuments; and (3) Establish vegetation on the covers. UR documentation is included as Appendix C of this report. The post-closure plan is presented in detail in Revision 1 of the CADD/CAP for the 92-Acre Area and CAU 111, and the requirements are summarized in Section 5.2 of this document. When the next request for modification of Resource Conservation and Recovery Act Permit NEV HW0101 is submitted to the Nevada Division of Environmental Protection (NDEP), the requirements for post-closure monitoring of the 92-Acre Area will be included. NNSA/NSO requests the following: (1) A Notice of Completion from NDEP to NNSA/NSO for closure of CAU 111; and (2) The transfer of CAU 111 from Appendix III to Appendix IV, Closed Corrective Action Units, of the FFACO.« less

  20. A novel one-shot circular stapler closure for atrial septal defect in a beating-heart porcine model.

    PubMed

    Tarui, Tatsuya; Tomita, Shigeyuki; Ishikawa, Norihiko; Ohtake, Hiroshi; Watanabe, Go

    2015-02-01

    In surgical atrial septal defect (ASD) closure, there are no techniques or devices that can close the ASD accurately in a short time under a beating heart. We have developed a simple and automatic ASD closure technique using a circular stapler. This study assessed the feasibility and efficacy of a new circular stapler closure for ASD. Under a continuous beating heart, hand-sewn patch plasty ASD closure was performed in 6 pigs (group A) and circular stapler ASD closure was performed in 6 pigs (group B). The time to close the ASD and the effectiveness of the closure were compared. Closure was significantly faster in group B (10.5 ± 1.0 seconds) than in group A (664 ± 10 seconds; p < 0.05). There was no leakage at the closure site, and sufficient tolerance was confirmed. A circular stapler can be used to treat ASD faster than hand-sewn patch plasty, with sufficient pressure tolerance in a beating heart porcine model. Copyright © 2015 The Society of Thoracic Surgeons. Published by Elsevier Inc. All rights reserved.

  1. STATUS REPORT ON THE EVALUATION OF THE ALTERNATIVE ASBESTOS CONTROL METHOD – A COMPARISON TO THE NESHAP METHOD OF DEMOLITION OF ASBESTOS CONTAINING BUILDINGS

    EPA Science Inventory

    Status Report on the Evaluation of the Alternative Asbestos Control Method – A Comparison to the NESHAP Method of Demolition of Asbestos Containing Buildings. This abstract and presentation are based, at least in part, on preliminary data and conclusions. The Alternative Asbestos...

  2. 24 CFR 969.107 - HUD approval of demolition or disposition before ACC expiration.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... disposition before ACC expiration. 969.107 Section 969.107 Housing and Urban Development REGULATIONS RELATING... HOUSING AFTER COMPLETION OF DEBT SERVICE § 969.107 HUD approval of demolition or disposition before ACC..., HUD may authorize a PHA to demolish or dispose of public housing at any time before the ACC Expiration...

  3. 120. NORTH PLANT GB BULK STORAGE BUILDING AND AMMUNITION DEMOLITION ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    120. NORTH PLANT GB BULK STORAGE BUILDING AND AMMUNITION DEMOLITION FACILITY AT CENTER AND CASE FILLING PLANT/CLUSTER ASSEMBLY BUILDING (BUILDING 1601/1606) IN BACKGROUND, FROM GB MANUFACTURING PLANT. VIEW TO WEST. - Rocky Mountain Arsenal, Bounded by Ninety-sixth Avenue & Fifty-sixth Avenue, Buckley Road, Quebec Street & Colorado Highway 2, Commerce City, Adams County, CO

  4. Report: EPA Should Update Guidance to Address the Release of Potentially Harmful Quantities of Asbestos That Can Occur Under EPA’s Asbestos Demolition Standard

    EPA Pesticide Factsheets

    Report #15-P-0168, June 16, 2015. Under the EPA's asbestos demolition standard, demolishing buildings that are structurally unsound and in imminent danger of collapse can release enough asbestos into the environment to pose a potential risk to human health

  5. Interior of during demolition; the brick structure in the middle ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Interior of during demolition; the brick structure in the middle housed the electric motors that ran the rolling mill (the motor house and rolling mills date from the early twentieth century) - Bethlehem Steel Corporation, South Bethlehem Works, Rolling Mill, Along Lehigh River, North of Fourth Street, West of Minsi Trail Bridge, Bethlehem, Northampton County, PA

  6. A profile of CCA-treated lumber removed from service in the southeastern United States decking market

    Treesearch

    Delton Alderman; Robert Smith; Philip A. Araman

    2003-01-01

    This research developed a profile of used chromated copper arsenate (CCA) lumber removed from the demolition of residential decking. This was achieved by gathering and compiling information regarding the construction, demolition, deck remodeling, deck replacement factors, and factors affecting the recovery of spent CCA lumber. In addition, qualitative responses...

  7. Data Gap Analysis and Damage Case Studies: Risk Analyses from Construction and Demolition Debris Landfills and Recycling Facilities

    EPA Science Inventory

    The report presents an evaluation of construction and demolition (C&D) debris management in the US to update and expand upon the previous set of data to include information on more recent cases of damage and potential impacts and expand the breadth of damages beyond groundwater a...

  8. THE INTEGRATION OF A PROPOSED ZONE CLOSURE APPROACH FOR THE PLUTONIUM FINISHING PLANT (PFP) DECOMMISSIONING & THE PFP ZONE HANFORD SITE WASHINGTON

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    HOPKINS, A.M.

    2005-02-23

    The Plutonium Finishing Plant (PFP) and associated processing facilities are located in the 200 area of the Hanford Site in Eastern Washington. This area is part of what is now called the Central Plateau. In order to achieve closure of the contaminated facilities and waste sites at Hanford on the Central Plateau (CP), a geographic re-districting of the area into zones has been proposed in the recently published Plan for Central Plateau Closure. One of the 22 zones proposed in the Central Plateau encompasses the PFP and ancillary facilities. Approximately eighty six buildings are included in the PFP Zone. Thismore » paper addresses the approach for the closure of the PFP Zone within the Central Plateau. The PFP complex of buildings forms the bulk of the structures in the PFP Zone. For closure of the above-grade portion of structures within the PFP complex, the approach is to remove them to a state called ''slab-on-grade'' per the criteria contained in PFP End Point Criteria document and as documented in action memoranda. For below-grade portions of the structures (such as below-grade rooms, pipe trenches and underground ducts), the approach is to remove as much residual contamination as practicable and to fill the void spaces with clean fill material such as sand, grout, or controlled density fill. This approach will be modified as planning for the waste sites progresses to ensure that the actions of the PFP decommissioning projects do not negatively impact future planned actions under the CERCLA. Cribs, settling tanks, septic tanks and other miscellaneous below-grade void spaces will either be cleaned to the extent practicable and filled or will be covered with an environmental barrier as determined by further studies and CERCLA decision documents. Currently, between two and five environmental barriers are proposed to be placed over waste sites and remaining building slabs in the PFP Zone.« less

  9. Closure Report for CAU No. 430: Buried Depleted Uraniuim Artillery Round No. 1, Tonopah Test Range, Revision 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    1997-02-25

    1.1 Purpose This Closure Report presents the information obtained from investigative actions performed to justify the decision for clean closure of CAU 430 through "No Further Action." The investigative actions were performed per the Streamlined Approach for Environmental Restoration Plan, CA UNO. 430: Buried Depleted Uranium Artille~ Round No. 1, Tonopah Test Range (DOE/NV, 1996a) (hereafter referred to as the SAFER Plan). The Buried DU Artillery Round No. 1 is located approximately 1.1 kilometers (km) (0.7 mile [mi]) south of Avenue 13 in the test area south of Area 9 (Figure 1-2). The site was thought to consist of amore » potentially unexploded W-79 Joint Test Assembly (JTA) test artillery projectile with high explosives (HE) and DU. The DU was substituted for Special Nuclear Material to prevent a nuclear explosion and yet retain the physical characteristics of uranium for ballistic and other mechanical tests. The projectile was reportedly buried in one pit, approximately 5 to 10 feet (ft) deep (Smith, 1993; Smith, 1996; Quas, 1996). The exact location of the burial pit is unknown; however, three disturbed areas (Sites A, B, and C) were identified through geophysical surveys, site visits, and employee interviews as possible locations of the test projectile (Figure 1-3). Results of the investigation are summarized within this Closure Report. Additional information about the site and investigation activities may be found in the SAFER Plan (DOE/NV, 1996a). 1.2 Scope The objectives of the SAFER Plan (DOE/NV, 1996a) activities were to prepare the site for closure through locating and identi~ing the projectile (Buried DU Artillery Round No. 1), destroying the projectile and any remaining components, collecting soil samples to detect residual contamination resulting from projectile destruction, and finally, remediating residual contamination.« less

  10. Streamlined Approach for Environmental Restoration (SAFER) Plan for Corrective Action Unit 544: Cellars, Mud Pits, and Oil Spills, Nevada Test Site, Nevada, Revision 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Mark Krauss

    2010-07-01

    This Streamlined Approach for Environmental Restoration (SAFER) Plan addresses the actions needed to achieve closure for Corrective Action Unit (CAU) 544, Cellars, Mud Pits, and Oil Spills, identified in the Federal Facility Agreement and Consent Order (FFACO). Corrective Action Unit 544 comprises the following 20 corrective action sites (CASs) located in Areas 2, 7, 9, 10, 12, 19, and 20 of the Nevada Test Site (NTS): • 02-37-08, Cellar & Mud Pit • 02-37-09, Cellar & Mud Pit • 07-09-01, Mud Pit • 09-09-46, U-9itsx20 PS #1A Mud Pit • 10-09-01, Mud Pit • 12-09-03, Mud Pit • 19-09-01, Mudmore » Pits (2) • 19-09-03, Mud Pit • 19-09-04, Mud Pit • 19-25-01, Oil Spill • 19-99-06, Waste Spill • 20-09-01, Mud Pits (2) • 20-09-02, Mud Pit • 20-09-03, Mud Pit • 20-09-04, Mud Pits (2) • 20-09-06, Mud Pit • 20-09-07, Mud Pit • 20-09-10, Mud Pit • 20-25-04, Oil Spills • 20-25-05, Oil Spills This plan provides the methodology for field activities needed to gather the necessary information for closing each CAS. There is sufficient information and process knowledge from historical documentation and investigations of similar sites regarding the expected nature and extent of potential contaminants to recommend closure of CAU 544 using the SAFER process. Using the approach approved for previous mud pit investigations (CAUs 530–535), 14 mud pits have been identified that • are either a single mud pit or a system of mud pits, • are not located in a radiologically posted area, and • have no evident biasing factors based on visual inspections. These 14 mud pits are recommended for no further action (NFA), and further field investigations will not be conducted. For the sites that do not meet the previously approved closure criteria, additional information will be obtained by conducting a field investigation before selecting the appropriate corrective action for each CAS. The results of the field investigation will support a defensible recommendation for closure of the remaining CASs in CAU 544. This will be presented in a closure report (CR) that will be prepared and submitted to the Nevada Division of Environmental Protection (NDEP) for review and approval. The sites will be investigated based on the data quality objectives (DQOs) developed on April 27, 2010, by representatives of NDEP and the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office (NNSA/NSO). The DQO process was used to identify and define the type, amount, and quality of data needed to determine and implement appropriate corrective actions for each CAS in CAU 544. The DQO process developed for this CAU identified the following expected closure options: (1) investigation and confirmation that no contamination exists above the final action levels (FALs) leading to an NFA declaration, (2) characterization of the nature and extent of contamination leading to closure in place with use restrictions, (3) clean closure by remediation and verification, (4) closure in place with use restrictions with no investigation if CASs are in crater areas that have been determined to be unsafe to enter, or (5) NFA if the mud pit CAS meets the criteria established during the CAUs 530–535 SAFER investigation. The following summarizes the SAFER activities that will support the closure of CAU 544: • Perform visual inspection of all CASs. • Perform site preparation activities (e.g., utilities clearances, construction of temporary site exclusion zones). • Removal of easily managed, nonhazardous, and nonradioactive debris, including vegetation (e.g., tumbleweeds), at various CASs that interfere with sampling, if required to inspect soil surface or collect soil sample. • Collect environmental samples from designated target populations (e.g., mud pits, cellars, stained soil) to confirm or disprove the presence of contaminants of concern (COCs) as necessary to supplement existing information. • If no COCs are present at a CAS, establish NFA as the corrective action. • If COCs exist, collect environmental samples from designated target populations (e.g., clean soil adjacent to contaminated soil) and submit for laboratory analyses to define the extent of COC contamination. • If a COC is present at a CAS, either - Establish clean closure as the corrective action. The material to be remediated will be removed, disposed of as waste, and verification samples will be collected from remaining soil, or - Establish closure in place as the corrective action and implement the appropriate use restrictions. • Confirm the preferred closure option is sufficient to protect human health and the environment.« less

  11. Optimized theory for simple and molecular fluids.

    PubMed

    Marucho, M; Montgomery Pettitt, B

    2007-03-28

    An optimized closure approximation for both simple and molecular fluids is presented. A smooth interpolation between Perkus-Yevick and hypernetted chain closures is optimized by minimizing the free energy self-consistently with respect to the interpolation parameter(s). The molecular version is derived from a refinement of the method for simple fluids. In doing so, a method is proposed which appropriately couples an optimized closure with the variant of the diagrammatically proper integral equation recently introduced by this laboratory [K. M. Dyer et al., J. Chem. Phys. 123, 204512 (2005)]. The simplicity of the expressions involved in this proposed theory has allowed the authors to obtain an analytic expression for the approximate excess chemical potential. This is shown to be an efficient tool to estimate, from first principles, the numerical value of the interpolation parameters defining the aforementioned closure. As a preliminary test, representative models for simple fluids and homonuclear diatomic Lennard-Jones fluids were analyzed, obtaining site-site correlation functions in excellent agreement with simulation data.

  12. Estimation of crown closure from AVIRIS data using regression analysis

    NASA Technical Reports Server (NTRS)

    Staenz, K.; Williams, D. J.; Truchon, M.; Fritz, R.

    1993-01-01

    Crown closure is one of the input parameters used for forest growth and yield modelling. Preliminary work by Staenz et al. indicates that imaging spectrometer data acquired with sensors such as the Airborne Visible/Infrared Imaging Spectrometer (AVIRIS) have some potential for estimating crown closure on a stand level. The objectives of this paper are: (1) to establish a relationship between AVIRIS data and the crown closure derived from aerial photography of a forested test site within the Interior Douglas Fir biogeoclimatic zone in British Columbia, Canada; (2) to investigate the impact of atmospheric effects and the forest background on the correlation between AVIRIS data and crown closure estimates; and (3) to improve this relationship using multiple regression analysis.

  13. The River Corridor Closure Contract How Washington Closure Hanford is Closing A Unique Department of Energy Project - 12425

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Feist, E.T.

    2012-07-01

    Cleanup of the Hanford River Corridor has been one of Hanford Site's top priorities since the early 1990's. This urgency is due to the proximity of hundreds of waste sites to the Columbia River and the groundwater that continues to threaten the Columbia River. In April 2005, the U.S. Department of Energy, Richland Operations Office (DOE-RL) awarded the Hanford River Corridor Closure Contract (RCCC), a cost-plus incentive-fee closure contract with a 2015 end date and first of its kind at Hanford Site, to Washington Closure Hanford (WCH), a limited-liability company owned by URS, Bechtel National, and CH2M HILL. WCH ismore » a single-purpose company whose goal is to safely, compliantly, and efficiently accelerate cleanup in the Hanford River Corridor and reduce or eliminate future obligations to DOE-RL for maintaining long-term stewardship over the site. Accelerated performance of the work-scope while keeping a perspective on contract completion presents challenges that require proactive strategies to support the remaining work-scope through the end of the RCCC. This paper outlines the processes to address the challenges of completing work-scope while planning for contract termination. WCH is responsible for cleanup of the River Corridor 569.8 km{sup 2} (220 mi{sup 2}) of the 1,517.7 km{sup 2} (586 mi{sup 2}) Hanford Site's footprint reduction. At the end of calendar year 2011, WCH's closure implementation is well underway. Fieldwork is complete in three of the largest areas within the RCCC scope (Segments 1, 2, and 3), approximately 44.5% of the River Corridor (Figure 3). Working together, DOE-RL and WCH are in the process of completing the 'paper work' that will document the completion of the work-scope and allow DOE-RL to relieve WCH of contractual responsibilities and transition the completed areas to the Long-Term Stewardship Program, pending final action RODs. Within the next 4 years, WCH will continue to complete cleanup of the River Corridor following the completion goals. As field work-scope is completed, progressive reductions of business processes, physical facilities, and staff will occur. Organizations will collapse and flatten commensurate with workload. WCH employees will move on to new endeavors, proud of their accomplishments and the legacy they are leaving behind as being the first and largest environmental cleanup closure contract at Hanford. (authors)« less

  14. 40 CFR 265.280 - Closure and post-closure.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ..., including amount, frequency, and pH of precipitation; (5) Geological and soil profiles and surface and subsurface hydrology of the site, and soil characteristics, including cation exchange capacity, total organic..., concentration, and depth of migration of hazardous waste constituents in the soil as compared to their...

  15. 40 CFR 265.280 - Closure and post-closure.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ..., including amount, frequency, and pH of precipitation; (5) Geological and soil profiles and surface and subsurface hydrology of the site, and soil characteristics, including cation exchange capacity, total organic..., concentration, and depth of migration of hazardous waste constituents in the soil as compared to their...

  16. 40 CFR 265.280 - Closure and post-closure.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ..., including amount, frequency, and pH of precipitation; (5) Geological and soil profiles and surface and subsurface hydrology of the site, and soil characteristics, including cation exchange capacity, total organic..., concentration, and depth of migration of hazardous waste constituents in the soil as compared to their...

  17. 40 CFR 265.280 - Closure and post-closure.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ..., including amount, frequency, and pH of precipitation; (5) Geological and soil profiles and surface and subsurface hydrology of the site, and soil characteristics, including cation exchange capacity, total organic..., concentration, and depth of migration of hazardous waste constituents in the soil as compared to their...

  18. 40 CFR 265.280 - Closure and post-closure.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ..., including amount, frequency, and pH of precipitation; (5) Geological and soil profiles and surface and subsurface hydrology of the site, and soil characteristics, including cation exchange capacity, total organic..., concentration, and depth of migration of hazardous waste constituents in the soil as compared to their...

  19. Closure Report for Corrective Action Unit 224: Decon Pad and Septic Systems, Nevada Test Site, Nevada

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NSTec Environmental Restoration

    Corrective Action Unit (CAU) 224 is located in Areas 02, 03, 05, 06, 11, and 23 of the Nevada Test Site, which is situated approximately 65 miles northwest of Las Vegas, Nevada. CAU 224 is listed in the Federal Facility Agreement and Consent Order (FFACO) of 1996 as Decon Pad and Septic Systems and is comprised of the following nine Corrective Action Sites (CASs): CAS 02-04-01, Septic Tank (Buried); CAS 03-05-01, Leachfield; CAS 05-04-01, Septic Tanks (4)/Discharge Area; CAS 06-03-01, Sewage Lagoons (3); CAS 06-05-01, Leachfield; CAS 06-17-04, Decon Pad and Wastewater Catch; CAS 06-23-01, Decon Pad Discharge Piping; CASmore » 11-04-01, Sewage Lagoon; and CAS 23-05-02, Leachfield. The Nevada Division of Environmental Protection (NDEP)-approved corrective action alternative for CASs 02-04-01, 03-05-01, 06-03-01, 11-04-01, and 23-05-02 is no further action. As a best management practice, the septic tanks and distribution box were removed from CASs 02-04-01 and 11-04-01 and disposed of as hydrocarbon waste. The NDEP-approved correction action alternative for CASs 05-04-01, 06-05-01, 06-17-04, and 06-23-01 is clean closure. Closure activities for these CASs included removing and disposing of radiologically and pesticide-impacted soil and debris. CAU 224 was closed in accordance with the NDEP-approved CAU 224 Corrective Action Plan (CAP). The closure activities specified in the CAP were based on the recommendations presented in the CAU 224 Corrective Action Decision Document (U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office, 2005). This Closure Report documents CAU 224 closure activities. During closure activities, approximately 60 cubic yards (yd3) of mixed waste in the form of soil and debris; approximately 70 yd{sup 3} of sanitary waste in the form of soil, liquid from septic tanks, and concrete debris; approximately 10 yd{sup 3} of hazardous waste in the form of pesticide-impacted soil; approximately 0.5 yd{sup 3} of universal waste in the form of fluorescent light bulbs; and approximately 0.5 yd{sup 3} of low-level waste in the form of a radiologically impacted fire hose rack were generated, managed, and disposed of appropriately. Waste minimization techniques, such as the utilization of laboratory analysis and field screening to guide the extent of excavations, were employed during the performance of closure work.« less

  20. Corrective Action Decision Document/Closure Report for Corrective Action Unit 105: Area 2 Yucca Flat Atmospheric Test Sites, Nevada National Security Site, Nevada, Revision 1

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Matthews, Patrick

    2014-01-01

    The purpose of this Corrective Action Decision Document/Closure Report is to provide justification and documentation supporting the recommendation that no further corrective action is needed for CAU 105 based on the implementation of the corrective actions. Corrective action investigation (CAI) activities were performed from October 22, 2012, through May 23, 2013, as set forth in the Corrective Action Investigation Plan for Corrective Action Unit 105: Area 2 Yucca Flat Atmospheric Test Sites; and in accordance with the Soils Activity Quality Assurance Plan, which establishes requirements, technical planning, and general quality practices.

  1. Corrective Action Decision Document/Closure Report for Corrective Action Unit 478: Area 12 T-Tunnel Ponds, Nevada Test Site

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NSTec Environmental Restoration

    This Corrective Action Decision Document (CADD)/Closure Report (CR) was prepared by the Defense Threat Reduction Agency (DTRA) for Corrective Action Unit (CAU) 478, Area 12 T-Tunnel Ponds. This CADD/CR is consistent with the requirements of the Federal Facility Agreement and Consent Order (FFACO) agreed to by the State of Nevada, the U.S. Department of Energy (DOE), and the U.S. Department of Defense. Corrective Action Unit 478 is comprised of one corrective action site (CAS): • 12-23-01, Ponds (5) RAD Area The purpose of this CADD/CR is to provide justification and documentation supporting the recommendation for closure in place with usemore » restrictions for CAU 478.« less

  2. Corrective Action Decision Document/Closure Report for Corrective Action Unit 559: T Tunnel Compressor/Blower Pad, Nevada Test Site

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NSTec Environmental Restoration

    This Corrective Action Decision Document (CADD)/Closure Report (CR) was prepared by the Defense Threat Reduction Agency (DTRA) for Corrective Action Unit (CAU) 559, T-Tunnel Compressor/Blower Pad. This CADD/CR is consistent with the requirements of the Federal Facility Agreement and Consent Order (FFACO) agreed to by the State of Nevada, the U.S. Department of Energy, and the U.S. Department of Defense. Corrective Action Unit 559 is comprised of one Corrective Action Site (CAS): • 12-25-13, Oil Stained Soil and Concrete The purpose of this CADD/CR is to provide justification and documentation supporting the recommendation for closure in place with use restrictionsmore » for CAU 559.« less

  3. Effects of incision closure method on infection prevalence following tibial plateau leveling osteotomy in dogs

    PubMed Central

    Atwood, Chase; Maxwell, Mac; Butler, Ryan; Wills, Robert

    2015-01-01

    The goal of this study was to retrospectively investigate the effect of incisional closure with either stainless steel skin staples or intradermal poliglecaprone 25 on the prevalence of surgical site infection following tibial plateau leveling osteotomy in dogs. Medical records were reviewed for dogs treated with unilateral tibial plateau leveling osteotomy at Memphis Veterinary Specialists between 2006 and 2013. Procedures (n = 306) from 242 dogs were included in the study. The association of potential risk factors with the occurrence of postoperative infection was assessed using logistic regression. A value of P < 0.05 was considered significant. Weight and administration of postoperative antimicrobials were found to significantly influence surgical site infection prevalence. No significant association was noted between closure method and prevalence of postoperative infection. PMID:25829557

  4. Comparison of anchorage reinforcement with temporary anchorage devices or a Herbst appliance during lingual orthodontic protraction of mandibular molars without maxillary counterbalance extraction.

    PubMed

    Metzner, Rebecca; Schwestka-Polly, Rainer; Helms, Hans-Joachim; Wiechmann, Dirk

    2015-06-20

    Orthodontic protraction of mandibular molars without maxillary counterbalance extraction in cases of aplasia or extraction requires stable anchorage. Reinforcement may be achieved by using either temporary anchorage devices (TAD) or a fixed, functional appliance. The objective was to compare the clinical effectiveness of both methods by testing the null-hypothesis of no significant difference in velocity of space closure (in mm/month) between them. In addition, we set out to describe the quality of posterior space management and treatment-related factors, such as loss of anchorage (assessed in terms of proportions of gap closure by posterior protraction or anterior retraction), frequencies of incomplete space closure, and potential improvement in the sagittal canine relationship. Twenty-seven subjects (15 male/12 female) with a total of 36 sites treated with a lingual multi-bracket appliance were available for retrospective evaluation of the effects of anchorage reinforcement achieved with either a Herbst appliance (n(subjects) = 15; 7 both-sided/8 single-sided Herbst appliances; n(sites) = 22) or TADs (n(subjects )= 12; 2 both-sided; 10 single-sided; n(sites) = 14). Descriptive analysis was based on measurements using intra-oral photographs which were individually scaled to corresponding plaster casts and taken on insertion of anchorage mechanics (T1), following removal of anchorage mechanics (T2), and at the end of multi-bracket treatment (T3). The null-hypothesis was rejected: The rate of mean molar protraction was significantly faster in the Herbst-reinforced group (0.51 mm/month) than in the TAD group (0.35). While complete space closure by sheer protraction of posterior teeth was achieved in all Herbst-treated cases, space closure in the TAD group was achieved in 76.9% of subjects by sheer protraction of molars, and it was incomplete in 50% of cases (mean gap residues: 1 mm). Whilst there was a deterioration in the canine relationship towards Angle-Class II malocclusion in 57.14% of space closure sites in TAD-treated subjects (indicating a loss of anchorage), an improvement in canine occlusion was observed in 90.9% of Herbst-treated cases. Subjects requiring rapid space closure by molar protraction in combination with a correction of distal occlusion may benefit from using Herbst appliances for anterior segment anchorage reinforcement rather than TAD anchorage.

  5. 10 CFR 960.3-4 - Environmental impacts.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... REPOSITORY Implementation Guidelines § 960.3-4 Environmental impacts. Environmental impacts shall be considered by the DOE throughout the site characterization, site selection, and repository development..., during site characterization and repository construction, operation, closure, and decommissioning. ...

  6. Planning for the closure of uncontrolled landfills in Turkey to reduce environmental impacts.

    PubMed

    Ergene Şentürk, Didar; Alp, Emre

    2016-11-01

    Landfilling is the most preferred solid waste disposal method in Turkey owing to both economic and technical reasons. However, beside the sanitary landfills there are also hundreds of uncontrolled waste sites located throughout Turkey, which are often left either abandoned or burning. Because there is a lack of legislative guidelines governing the closure and rehabilitation of these dumpsites, the municipalities that are responsible for waste management do not initiate the proactive strategies required for the closure of these sites. In this study, a method based on a multi-criteria analysis is conducted for different dumpsites in Turkey to evaluate the level of negative impacts on the environment. This method is based on the use of environmental indices for a quantitative assessment of the landfills, such as environmental interaction between the source and the receptors, environmental values of the receptors, and operational conditions. It was possible to assess the robustness of the proposed methodology since the pre- and post-groundwater quality monitoring data was available from the study sites that were closed and rehabilitated in 2014. The results of this study show that the method based on a multi-criteria analysis is an effective tool while in the preliminary planning stages of closure and rehabilitation activities of uncontrolled waste landfills. © The Author(s) 2016.

  7. Dramatic increase in the relative abundance of large male dungeness crabs Cancer magister following closure of commercial fishing in Glacier Bay, Alaska

    USGS Publications Warehouse

    Taggart, S. James; Shirley, Thomas C.; O'Clair, Charles E.; Mondragon, Jennifer

    2004-01-01

    The size structure of the population of the Dungeness crab Cancer magister was studied at six sites in or near Glacier Bay, Alaska, before and after the closure of commercial fishing. Seven years of preclosure and 4 years of postclosure data are presented. After the closure of Glacier Bay to commercial fishing, the number and size of legal-sized male Dungeness crabs increased dramatically at the experimental sites. Female and sublegal-sized male crabs, the portions of the population not directly targeted by commercial fishing, did not increase in size or abundance following the closure. There was not a large shift in the size-abundance distribution of male crabs at the control site that is still open to commercial fishing. Marine protected areas are being widely promoted as effective tools for managing fisheries while simultaneously meeting marine conservation goals and maintaining marine biodiversity. Our data demonstrate that the size of male Dungeness crabs can markedly increase in a marine reserve, which supports the concept that marine reserves could help maintain genetic diversity in Dungeness crabs and other crab species subjected to size-limit fisheries and possibly increase the fertility of females. ?? 2004 by the American Fisheries Society.

  8. Estimate of the dispersivity of rock crushing in the zone of demolition of mine workings by the action of an explosion

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sushkov, Y.V.; Borulev, A.D.; Yakovlev, N.A.

    1986-05-01

    The authors consider the problems of modeling the process of collapse of extended mine workings on plane models. Their derivation has been effected on the basis of the model of the ground and criteria of its demolition. It is assumed that in order to ensure similarity of crushing, equality of the amount of fissures developed in the natural state and the model is necessary. An analysis of the dependence of the average size of a ''lump'' in the demolition zone on the magnitude of the maximum stress in the wave, carried out by the method of least squares, showed thatmore » it can be represented quite well in the form of two intersecting straight lines.« less

  9. Safety Oversight of Decommissioning Activities at DOE Nuclear Sites

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Zull, Lawrence M.; Yeniscavich, William

    2008-01-15

    The Defense Nuclear Facilities Safety Board (Board) is an independent federal agency established by Congress in 1988 to provide nuclear safety oversight of activities at U.S. Department of Energy (DOE) defense nuclear facilities. The activities under the Board's jurisdiction include the design, construction, startup, operation, and decommissioning of defense nuclear facilities at DOE sites. This paper reviews the Board's safety oversight of decommissioning activities at DOE sites, identifies the safety problems observed, and discusses Board initiatives to improve the safety of decommissioning activities at DOE sites. The decommissioning of former defense nuclear facilities has reduced the risk of radioactive materialmore » contamination and exposure to the public and site workers. In general, efforts to perform decommissioning work at DOE defense nuclear sites have been successful, and contractors performing decommissioning work have a good safety record. Decommissioning activities have recently been completed at sites identified for closure, including the Rocky Flats Environmental Technology Site, the Fernald Closure Project, and the Miamisburg Closure Project (the Mound site). The Rocky Flats and Fernald sites, which produced plutonium parts and uranium materials for defense needs (respectively), have been turned into wildlife refuges. The Mound site, which performed R and D activities on nuclear materials, has been converted into an industrial and technology park called the Mound Advanced Technology Center. The DOE Office of Legacy Management is responsible for the long term stewardship of these former EM sites. The Board has reviewed many decommissioning activities, and noted that there are valuable lessons learned that can benefit both DOE and the contractor. As part of its ongoing safety oversight responsibilities, the Board and its staff will continue to review the safety of DOE and contractor decommissioning activities at DOE defense nuclear sites.« less

  10. MANTA, a novel plug-based vascular closure device for large bore arteriotomies: technical report.

    PubMed

    van Gils, Lennart; Daemen, Joost; Walters, Greg; Sorzano, Todd; Grintz, Todd; Nardone, Sam; Lenzen, Mattie; De Jaegere, Peter P T; Roubin, Gary; Van Mieghem, Nicolas M

    2016-09-18

    Catheter-based interventions have become a less invasive alternative to conventional surgical techniques for a wide array of cardiovascular diseases but often create large arteriotomies. A completely percutaneous technique is attractive as it may reduce the overall complication rate and procedure time. Currently, large bore arteriotomy closure relies on suture-based techniques. Access-site complications are not uncommon and often seem related to closure device failure. The MANTA VCD is a novel collagen-based closure device that specifically targets arteriotomies between 10 and 22 Fr. This technical report discusses the MANTA design concept, practical instructions for use and preliminary clinical experience.

  11. CO2CARE - Site Closure Assessment Research - Recent Results

    NASA Astrophysics Data System (ADS)

    Wipki, Mario; Liebscher, Axel; Kühn, Michael; Lüth, Stefan; Durucan, Sevket; Deflandre, Jean-Pierre; Wollenweber, Jens; Chadwick, Andy; Böhm, Gualtiero

    2013-04-01

    The EU project CO2CARE, which started in January 2011, supports the large scale demonstration of CCS technology by addressing requirements of operators and regulators face in terms of CO2 storage site abandonment. The CO2CARE consortium, consisting of 24 project partners from universities, research institutes, and the industry, investigate technologies and procedures for abandonment and post-closure safety, satisfying the regulatory requirements for the transfer of responsibility. Nine key injections sites in Europe, USA, Japan, and Australia, each with a specific (hydro) geological and environmental character, were selected for investigations. These sites can be divided into the CO2 storage types on-shore, off-shore, natural CO2 reservoir, depleted gas reservoirs, and saline aquifers. The project mainly focuses on three key areas: - well abandonment and long-term integrity; - reservoir management and prediction from closure to the long-term; - risk management methodologies for long-term safety. These key areas are in turn closely linked to the three high-level requirements of the EU Directive 2009/31/EC, Article 18 for CO2 storage which are: (i) absence of any detectable leakage, (ii) conformity of actual behaviour of the injected CO2 with the modeled behaviour, and (iii) the storage site is evolving towards a situation of long-term stability. The identification of criteria and the development of site abandonment procedures and technologies, which guarantee the fulfillment of the high-level requirements, are the major objectives in CO2CARE. These criteria have to be fulfilled prior to subsequent transfer of responsibility to the competent authorities, typically 20 or 30 years after site closure. Finally, the essential results of the different working groups in CO2CARE will feed into overall guidelines for regulatory compliance and "Best Practice" for site abandonment. Dissemination of the results will show policy makers and the general public how site abandonment procedures for CO2 storage sites can be undertaken sustainably, cost-effectively and with no adverse effect to the local population and the natural environment. After more than two-thirds of the project`s lifetime, an overview of the project`s goals and the most relevant research findings are presented.

  12. Evaluation of impacts and mitigation assessments for the UMTRA Project: Gunnison and Durango pilot studies. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Beranich, S.J.

    1994-08-24

    This report evaluates the impacts assessment and proposed mitigations provided in environmental documents concerning the US Department of Energy`s (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project. The projected impacts and proposed mitigations identified in UMTRA Project environmental documents were evaluated for two UMTRA Project sites. These sites are Gunnison and Durango, which are representative of currently active and inactive UMTRA Project sites, respectively. National Environmental Policy Act (NEPA) documentation was prepared for the remedial action at Durango and Gunnison as well as for the provision of an alternate water supply system at Gunnison. Additionally, environmental analysis was completed formore » mill site demolition Gunnison, and for a new road related to the Durango remedial action. The results in this report pertain only to the impact assessments prepared by the Regulatory Compliance staff as a part of the NEPA compliance requirements. Similarly, the mitigative measures documented are those that were identified during the NEPA process.« less

  13. Superfund record of decision (EPA Region 5): Feed Materials Production Center, (USDOE), Operable Unit 4, Fernald, Hamilton County, OH, December 7, 1995

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    This decision document presents the selected remedial action for Operable Unit 4 of the Fernald Site in Fernald, Ohio. The materials within Operable Unit 4 exhibit a wide range of properties. Most notable would be the elevated direct radiation associated with the K-65 residues versus the much lower direct radiation associated with cold metal oxides in Silo 3. Even more significant would be the much lower levels of contamination associated with the soils and building materials, like concrete, within the Operable Unit 4 Study Area. On the basis of the evaluation of final alternatives, the selected remedy addressing Operable Unitmore » 4 at the FEMP is a combination of Alternatives 3A.1/Vit - Removal, Vitrification, and Off-site Disposal - Nevada Test Site (NTS); 3B.1/Vit - Removal, Vitrification, and Off-site Disposal - NTS; and 2C - Demolition, Removal and On-Property Disposal.« less

  14. Monitoring underwater explosions in the habitat of resident bottlenose dolphins.

    PubMed

    dos Santos, Manuel E; Couchinho, Miguel N; Rita Luís, Ana; Gonçalves, Emanuel J

    2010-12-01

    Maintenance work on the harbor of Setúbal, in Portugal, required the removal of a 14-m deep rocky outcrop at the ship maneuver area, using about 35 kg of Gelamonite, a nitroglycerin-based high-explosive. This important harbor is located in the Sado estuary, a biologically rich environment and an important feeding area for a resident community of bottlenose dolphins. Using different safe range calculation models, a mitigation and monitoring plan was developed that minimized the risks of these underwater explosions for the dolphins. At our monitoring station, at 2 km from the demolition site, acoustic pressure levels in excess of 170 dB re 1 μPa (root-mean-square) were measured. Samples of dead fish collected at the site were indicative of shock trauma from the blasts.

  15. Installation Restoration Program. Phase 1 - Records Search AAC-Northern Region, Galena AFS, Campion AFS, Cape Lisburne AFS, Fort Yukon AFS, Indian Mountain AFS, Kotzebue AFS, Murphy Dome AFS, and Tin City AFS

    DTIC Science & Technology

    1985-09-01

    GM SILTY GRAVEL GP POORLY GRADED GRAVEL SM SILTY SAND SP POORLY GRADED SAND SW WELL GRADED SAND ML LOW PLASTICITY SILT SOURCE: INSTALLATION DOCUMENTS... plastic on the side toward th’e beach in an attempt to prevent migration of fuel. to the beach. During the site visit for this Phase I IRP study the...Force have included garbage, refuse, incinerator ash (since 1975), wood, metal, plastic and bulky - materials such as construction and demolition debris

  16. 33 CFR 165.T11-589 - Safety zone; SFOBB Demolition Safety Zone, San Francisco, CA.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... Guard District § 165.T11-589 Safety zone; SFOBB Demolition Safety Zone, San Francisco, CA. (a) Location... Safety Zone, San Francisco, CA. 165.T11-589 Section 165.T11-589 Navigation and Navigable Waters COAST... paragraph (a) of this section will be in effect from 6 a.m. to 7 p.m. daily from September 1, 2013 until...

  17. The uncertainty principle in resonant gravitational wave antennae and quantum non-demolition measurement schemes

    NASA Technical Reports Server (NTRS)

    Fortini, Pierluigi; Onofrio, Roberto; Rioli, Alessandro

    1993-01-01

    A review of current efforts to approach and to surpass the fundamental limit in the sensitivity of the Weber type gravitational wave antennae is reported. Applications of quantum non-demolition techniques to the concrete example of an antenna resonant with the transducer are discussed in detail. Analogies and differences from the framework of the squeezed states in quantum optics are discussed.

  18. A BIM-based system for demolition and renovation waste estimation and planning.

    PubMed

    Cheng, Jack C P; Ma, Lauren Y H

    2013-06-01

    Due to the rising worldwide awareness of green environment, both government and contractors have to consider effective construction and demolition (C&D) waste management practices. The last two decades have witnessed the growing importance of demolition and renovation (D&R) works and the growing amount of D&R waste disposed to landfills every day, especially in developed cities like Hong Kong. Quantitative waste prediction is crucial for waste management. It can enable contractors to pinpoint critical waste generation processes and to plan waste control strategies. In addition, waste estimation could also facilitate some government waste management policies, such as the waste disposal charging scheme in Hong Kong. Currently, tools that can accurately and conveniently estimate the amount of waste from construction, renovation, and demolition projects are lacking. In the light of this research gap, this paper presents a building information modeling (BIM) based system that we have developed for estimation and planning of D&R waste. BIM allows multi-disciplinary information to be superimposed within one digital building model. Our system can extract material and volume information through the BIM model and integrate the information for detailed waste estimation and planning. Waste recycling and reuse are also considered in our system. Extracted material information can be provided to recyclers before demolition or renovation to make recycling stage more cooperative and more efficient. Pick-up truck requirements and waste disposal charging fee for different waste facilities will also be predicted through our system. The results could provide alerts to contractors ahead of time at project planning stage. This paper also presents an example scenario with a 47-floor residential building in Hong Kong to demonstrate our D&R waste estimation and planning system. As the BIM technology has been increasingly adopted in the architectural, engineering and construction industry and digital building information models will likely to be available for most buildings (including historical buildings) in the future, our system can be used in various demolition and renovation projects and be extended to facilitate project control. Copyright © 2013 Elsevier Ltd. All rights reserved.

  19. 10 CFR 960.5-2-8 - Surface characteristics.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... NUCLEAR WASTE REPOSITORY Preclosure Guidelines Ease and Cost of Siting, Construction, Operation, and... repository siting, construction, operation, and closure. (b) Favorable conditions. (1) Generally flat terrain...

  20. 10 CFR 960.5-2-8 - Surface characteristics.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... NUCLEAR WASTE REPOSITORY Preclosure Guidelines Ease and Cost of Siting, Construction, Operation, and... repository siting, construction, operation, and closure. (b) Favorable conditions. (1) Generally flat terrain...

  1. 10 CFR 960.5-2-8 - Surface characteristics.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... NUCLEAR WASTE REPOSITORY Preclosure Guidelines Ease and Cost of Siting, Construction, Operation, and... repository siting, construction, operation, and closure. (b) Favorable conditions. (1) Generally flat terrain...

  2. 10 CFR 960.5-2-8 - Surface characteristics.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... NUCLEAR WASTE REPOSITORY Preclosure Guidelines Ease and Cost of Siting, Construction, Operation, and... repository siting, construction, operation, and closure. (b) Favorable conditions. (1) Generally flat terrain...

  3. Eddy Covariance Measurements Over a Maize Field: The Contribution of Minor Flux Terms to the Energy Balance Gap

    NASA Astrophysics Data System (ADS)

    Smidt, J.; Ingwersen, J.; Streck, T.

    2015-12-01

    The lack of energy balance closure is a long-standing problem in eddy covariance (EC) measurements. The energy balance equation is defined as Rn - G = H + λE, where Rn is net radiation, G is the ground heat flux, H is the sensible heat flux and λE is the latent heat flux. In most cases of energy imbalance, either Rn is overestimated or the ground heat and turbulent fluxes are underestimated. Multiple studies have shown that calculations, incorrect instrument installation/calibration and measurement errors alone do not entirely account for this imbalance. Rather, research is now focused on previously neglected sources of heat storage in the soil, biomass and air beneath the EC station. This project examined the potential of five "minor flux terms" - soil heat storage, biomass heat storage, energy consumption by photosynthesis, air heat storage and atmospheric moisture change, to further close the energy balance gap. Eddy covariance measurements were conducted at a maize (Zea mays) field in southwest Germany during summer 2014. Soil heat storage was measured for six weeks at 11 sites around the field footprint. Biomass and air heat storage were measured for six subsequent weeks at seven sites around the field footprint. Energy consumption by photosynthesis was calculated using the CO2 flux data. Evapotranspiration was calculated using the water balance method and then compared to the flux data processed with three post-closure methods: the sensible heat flux, the latent heat flux and the Bowen ratio post-closure methods. An energy balance closure of 66% was achieved by the EC station measurements over the entire investigation period. During the soil heat flux campaign, EC station closure was 74.1%, and the field footprint soil heat storage contributed 3.3% additional closure. During the second minor flux term measurement period, closure with the EC station data was 91%. Biomass heat storage resulted in 1.1% additional closure, the photosynthesis flux closed the gap by an additional 7.8%, air heat storage closure was -0.3% and atmospheric moisture change was negligible with an additional closure of <0.01%. These four terms resulted in a total additional closure of 8.6% over the EC station measurements. The Bowen Ratio post-closure method yielded values most similar to the water balance method over the entire season.

  4. Relaxing the closure assumption in single-season occupancy models: staggered arrival and departure times

    USGS Publications Warehouse

    Kendall, William L.; Hines, James E.; Nichols, James D.; Grant, Evan H. Campbell

    2013-01-01

    Occupancy statistical models that account for imperfect detection have proved very useful in several areas of ecology, including species distribution and spatial dynamics, disease ecology, and ecological responses to climate change. These models are based on the collection of multiple samples at each of a number of sites within a given season, during which it is assumed the species is either absent or present and available for detection while each sample is taken. However, for some species, individuals are only present or available for detection seasonally. We present a statistical model that relaxes the closure assumption within a season by permitting staggered entry and exit times for the species of interest at each site. Based on simulation, our open model eliminates bias in occupancy estimators and in some cases increases precision. The power to detect the violation of closure is high if detection probability is reasonably high. In addition to providing more robust estimation of occupancy, this model permits comparison of phenology across sites, species, or years, by modeling variation in arrival or departure probabilities. In a comparison of four species of amphibians in Maryland we found that two toad species arrived at breeding sites later in the season than a salamander and frog species, and departed from sites earlier.

  5. Determination of respirable-sized crystalline silica in different ambient environments in the United Kingdom with a mobile high flow rate sampler utilising porous foams to achieve the required particle size selection

    NASA Astrophysics Data System (ADS)

    Stacey, Peter; Thorpe, Andrew; Roberts, Paul; Butler, Owen

    2018-06-01

    Inhalation of respirable crystalline silica (RCS) can cause diseases including silicosis and cancer. Levels of RCS close to an emission source are measured but little is known about the wider ambient exposure from industry emissions or natural sources. The aim of this work is to report the RCS concentrations obtained from a variety of ambient environments using a new mobile respirable (PM4) sampler. A mobile battery powered high flow rate (52 L min-1) sampler was developed and evaluated for particulate aerosol sampling employing foams to select the respirable particle size fraction. Sampling was conducted in the United Kingdom at site boundaries surrounding seven urban construction and demolition and five sand quarry sites. These are compared with data from twelve urban aerosol samples and from repeat measurements from a base line study at a single rural site. The 50% particle size penetration (d50) through the foam was 4.3 μm. Over 85% of predict bias values were with ±10% of the respirable convention, which is based on a log normal curve. Results for RCS from all construction and quarry activities are generally low with a 95 th percentile of 11 μg m-3. Eighty percent of results were less than the health benchmark value of 3 μg m-3 used in some states in America for ambient concentrations. The power cutting of brick and the largest demolition activities gave the highest construction levels. Measured urban background RCS levels were typically below 0.3 μg m-3 and the median RCS level, at a rural background location, was 0.02 μg m-3. These reported ambient RCS concentrations may provide useful baseline values to assess the wider impact of fugitive, RCS containing, dust emissions into the wider environment.

  6. Pathobiology and genetics of neural tube defects.

    PubMed

    Finnell, Richard H; Gould, Amy; Spiegelstein, Ofer

    2003-01-01

    Neural tube defects (NTDs), including spina bifida and anencephaly, are common congenital malformations that occur when the neural tube fails to achieve proper closure during early embryogenesis. Based on epidemiological and clinical data obtained over the last few decades, it is apparent that these multifactorial defects have a significant genetic component to their etiology that interacts with specific environmental risk factors. The purpose of this review article is to synthesize the existing literature on the genetic factors contributing to NTD risk. To date, there is evidence that closure of the mammalian neural tube initiates and fuses intermittently at four discrete locations. Disruption of this process at any of these four sites may lead to an NTD, possibly arising through closure site-specific genetic mechanisms. Candidate genes involved in neural tube closure include genes of the folate metabolic pathway, as well as those involved in folate transport. Although extensive efforts have focused on elucidating the genetic risk factors contributing to the etiology of NTDs, the population burden for these malformations remains unknown. One group at high risk for having children with NTDs is epileptic women receiving antiepileptic medications during pregnancy. Efforts to better understand the genetic factors that may contribute to their heightened risk, as well as the pathogenesis of neural tube closure defects, are reviewed herein.

  7. Corrective Action Decision Document/Closure Report for Corrective Action Unit 571: Area 9 Yucca Flat Plutonium Dispersion Sites, Nevada National Security Site, Nevada, Revision 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Matthews, Patrick

    2014-08-01

    The purpose of this CADD/CR is to provide documentation and justification that no further corrective action is needed for the closure of CAU 571 based on the implementation of corrective actions. This includes a description of investigation activities, an evaluation of the data, and a description of corrective actions that were performed. The CAIP provides information relating to the scope and planning of the investigation. Therefore, that information will not be repeated in this document.

  8. Roles of Historical Photography in Waste Site Characterization, Closure, and Remediation

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Mackey, H.

    1998-07-01

    Over 40,000 frames of vertical historical photography from 1938 to 1996 and over 10,000 frames of oblique photography from 1981 to 1991 of the 777-square kilometer Savannah River Site in south central South Carolina were reviewed, cataloged, and referenced utilizing ARCView and associated ArcInfo tools. This allows environmental reviews of over 400 potential waste units on the SRS to be conducted in a rapid fashion to support preparation of work plans, characterization, risk assessments, and closure of the waste units in a more cost effective manner.

  9. Stent-Grafts in the Management of Hemorrhagic Complications Related to Hemostatic Closure Devices: Report of Two Cases

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Giansante Abud, Daniel; Mounayer, Charbel; Saint-Maurice, Jean Pierre

    We report 2 cases of hemorrhagic complications related to use of the Angio-Seal hemostatic closure device that were successfully managed with stent-grafts. Two patients with subarachnoid hemorrhage were referred to our departments for endovascular treatment of ruptured intracranial aneurysms. The treatment was performed through a femoral access; the sheaths were removed immediately after the procedures, and the punctures sites closed by Angio-Seals. Both patients presented clinical signs of hypovolemic shock after treatment. The diagnosis of active bleeding through the puncture site was made by emergency digital subtraction angiography. The lesions were managed with stent-grafts. The use of stent-grafts proved tomore » be efficient in the management of these life-threatening hemorrhagic complications following the use of the Angio-Seal hemostatic closure device.« less

  10. Heterochrony and patterns of cranial suture closure in hystricognath rodents

    PubMed Central

    Wilson, Laura A B; Sánchez-Villagra, Marcelo R

    2009-01-01

    Sutures, joints that allow one bone to articulate with another through intervening fibrous connective tissue, serve as major sites of bone expansion during postnatal craniofacial growth in the vertebrate skull and represent an aspect of cranial ontogeny which may exhibit functional and phylogenetic correlates. Suture evolution among hystricognath rodents, an ecologically diverse group represented here by 26 species, is examined using sequence heterochrony methods, i.e. event pairing and parsimov. Although minor nuances in suture closure sequence exist between species, the overall sequence was found to be conserved both across the hystricognath group and, to an increasing degree, within selected clades. At species level, suture closure pattern exhibited a significant positive correlation with patterns previously reported for hominoids. Patterns for most clades revealed the first sutures to close are those contacting the exoccipital, interparietal, and palatine bones. Heterochronic shifts were found along 19 of 35 branches within the hystricognath phylogeny. The number of shifts per node ranged from one to seven events and, overall, involved 21 of 34 suture sites. The topology generated by parsimony analyses of the event pair matrix yielded only one grouping that was congruent with the evolutionary relationships, compiled from morphological and molecular studies, taken as framework. Sutures contacting the exoccipital displayed the highest levels of most complete closure across all species. Level of suture closure is negatively correlated with cranial length (P < 0.05). Differing life history and locomotory strategies are coupled in part with differing suture closure patterns among several species. PMID:19245501

  11. Partial growth plate closure: apex view on bone scan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Howman-Giles, R.; Trochei, M.; Yeates, K.

    1985-01-01

    A new technique of using /sup 99m/Tc bone scan to assess partial closure of the growth plate is described. The site and degree of osseous fusion can be obtained by using the apex view. The technique has the potential of assessing serially the growth of a plate before and after surgery.

  12. No-migration variance petition. Appendices C--J: Volume 5, Revision 1

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1990-03-01

    Volume V contains the appendices for: closure and post-closure plans; RCRA ground water monitoring waver; Waste Isolation Division Quality Program Manual; water quality sampling plan; WIPP Environmental Procedures Manual; sample handling and laboratory procedures; data analysis; and Annual Site Environmental Monitoring Report for the Waste Isolation Pilot Plant.

  13. Engineering study for closure of 209E facility

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Brevick, C.H.; Heys, W.H.; Johnson, E.D.

    1997-07-07

    This document is an engineering study for evaluating alternatives to determine the most cost effective closure plan for the 209E Facility, Critical Mass Laboratory. This laboratory is located in the 200 East Area of the Hanford Site and contains a Critical Assembly Room and a Mix room were criticality experiments were once performed.

  14. EVALUATION OF MASS FLUX TO AND FROM GROUND WATER USING A VERTICAL FLUX MODEL (VFLUX): APPLICATION TO THE SOIL VACUUM EXTRACTION CLOSURE PROBLEM

    EPA Science Inventory

    Site closure for soil vacuum extraction (SVE) application typically requires attainment of specified soil concentration standards based on the premise that mass flux from the vadose zone to ground water not result in levels exceeding maximum contaminant levels (MCLSs). Unfortuna...

  15. Site Development, Operations, and Closure Plan Topical Report 5 An Assessment of Geologic Carbon Sequestration Options in the Illinois Basin. Phase III

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Finley, Robert; Payne, William; Kirksey, Jim

    2015-06-01

    The Midwest Geological Sequestration Consortium (MGSC) has partnered with Archer Daniels Midland Company (ADM) and Schlumberger Carbon Services to conduct a large-volume, saline reservoir storage project at ADM’s agricultural products processing complex in Decatur, Illinois. The Development Phase project, named the Illinois Basin Decatur Project (IBDP) involves the injection of 1 million tonnes of carbon dioxide (CO 2) into a deep saline formation of the Illinois Basin over a three-year period. This report focuses on objectives, execution, and lessons learned/unanticipated results from the site development (relating specifically to surface equipment), operations, and the site closure plan.

  16. Post-Closure Inspection Letter Report for Corrective Action Units on the Nevada National Security Site

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Boehleke, R. F.

    2014-05-06

    This letter serves as the post-closure inspection letter report for Corrective Action Units (CAUs) on the Nevada National Security Site for calendar year 2013. The inspections identified maintenance and repair is required at the following sites: sign and/or fence repair is necessary at CAUs 113, 137, 139, 140, 143, 262, 370, 371, 372, 374, 476, 478, 529, 542, and 560; animal burrows were identified at CAU 547; and erosion was identified at CAUs 366, 367, 383, 551, and 574. In addition, the following use restrictions were removed during 2013 and will no longer be inspected in 2014: 165, 357, andmore » 528.« less

  17. 10 CFR 960.5-2 - Technical guidelines.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ..., operation, and closure. The first group includes conditions on population density and distribution, site... the surface characteristics of the site, the characteristics of the host rock and surrounding strata...

  18. 10 CFR 960.5-2 - Technical guidelines.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ..., operation, and closure. The first group includes conditions on population density and distribution, site... the surface characteristics of the site, the characteristics of the host rock and surrounding strata...

  19. 10 CFR 960.5-2 - Technical guidelines.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ..., operation, and closure. The first group includes conditions on population density and distribution, site... the surface characteristics of the site, the characteristics of the host rock and surrounding strata...

  20. 10 CFR 960.5-2 - Technical guidelines.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ..., operation, and closure. The first group includes conditions on population density and distribution, site... the surface characteristics of the site, the characteristics of the host rock and surrounding strata...

  1. DOE Office of Scientific and Technical Information (OSTI.GOV)

    G. N. Doyle

    Corrective Action Unit (CAU) 254 is located in Area 25 of the Nevada Test Site (NTS), approximately 100 kilometers (km) (62 miles) northwest of Las Vegas, Nevada. The site is located within the Reactor Maintenance, Assembly and Disassembly (R-MAD) compound and consists of Building 3126, two outdoor decontamination pads, and surrounding areas within an existing fenced area measuring approximately 50 x 37 meters (160 x 120 feet). The site was used from the early 1960s to the early 1970s as part of the Nuclear Rocket Development Station program to decontaminate test-car hardware and tooling. The site was reactivated in themore » early 1980s to decontaminate a radiologically contaminated military tank. This Closure Report (CR) describes the closure activities performed to allow un-restricted release of the R-MAD Decontamination Facility.« less

  2. Heat Storage and Energy Closure in Two Tropical Montane Forests in Hawaii

    NASA Astrophysics Data System (ADS)

    Mudd, R. G.; Giambelluca, T. W.; Huang, M.

    2012-12-01

    To date, eddy covariance observations of evapotranspiration (ET) in tropical rainforest ecosystems are limited and thorough assessments of such observations are rare. In this study, we present a detailed evaluation of eddy covariance data collected at two sites in Hawaii Volcanoes National Park, Hawaii, for a 34 month period to evaluate the importance of biomass and air heat storage to the energy balance and determine site specific energy closure characteristics. One site is located in a native Hawaiian tropical montane forest dominated by Metrosideros polymorpha (Nahuku), while the other is located in a nearby forest (Olaa) that has been partially invaded by strawberry guava (Psidium cattleianum). Vertical and radial distribution of all biomass components were evaluated from detailed stand surveys, biomass samples, allometric relationships, wood density, fresh to dry weight ratios of plant materials, and temperature measurements of stem biomass. Total fresh biomass was estimated to be 69.8 ± 11.7 kg m-2 and 75.9 ± 16.6 kg m-2 at Nahuku and Olaa, respectively, and the contribution of separate biomass components to energy closure were evaluated in detail. Despite statistically similar fresh biomass between stands, energy storage was found to be significantly greater at the forest site with P. cattleianum tree invasion (Olaa) than at the native forest stand (Nahuku). The difference was attributed to a higher proportion of smaller stems at Olaa, absorbing and releasing more heat for a given mass. Inclusion of biomass and air heat storage in the energy balance improved the relative energy closure, the slope of the linear regression (forced through the origin) of the sum of latent and sensible heat fluxes measured above the canopies for each 30-minute period from 0.767 to 0.805 at Nahuku and from 0.918 to 0.997 at Olaa. The mean absolute energy imbalance, the mean of the differences between the available energy and the sum of latent and sensible heat fluxes for each 30-minute interval for a binned group of values, was also reduced for most parts of the diurnal cycle. These results indicate that it is necessary to include heat storage in energy balance investigations to reduce error in energy balance adjustments of ET. However, it was found that the relative energy closure is not constant over all environmental conditions and has complex relationships with friction velocity, atmospheric stability, and time of day. Therefore, energy closure adjustments to ET estimates should consider environmentally controlled variation in the relative and absolute energy closure in order to reduce error in estimates of land-atmosphere gas exchange. Furthermore, including all significant heat storage terms does not close the energy balance at the native forest site, which is likely due to additional site specific factors influencing the characteristics of turbulent flows over the surface.

  3. Regional neural tube closure defined by the Grainy head-like transcription factors.

    PubMed

    Rifat, Yeliz; Parekh, Vishwas; Wilanowski, Tomasz; Hislop, Nikki R; Auden, Alana; Ting, Stephen B; Cunningham, John M; Jane, Stephen M

    2010-09-15

    Primary neurulation in mammals has been defined by distinct anatomical closure sites, at the hindbrain/cervical spine (closure 1), forebrain/midbrain boundary (closure 2), and rostral end of the forebrain (closure 3). Zones of neurulation have also been characterized by morphologic differences in neural fold elevation, with non-neural ectoderm-induced formation of paired dorso-lateral hinge points (DLHP) essential for neural tube closure in the cranial and lower spinal cord regions, and notochord-induced bending at the median hinge point (MHP) sufficient for closure in the upper spinal region. Here we identify a unifying molecular basis for these observations based on the function of the non-neural ectoderm-specific Grainy head-like genes in mice. Using a gene-targeting approach we show that deletion of Grhl2 results in failed closure 3, with mutants exhibiting a split-face malformation and exencephaly, associated with failure of neuro-epithelial folding at the DLHP. Loss of Grhl3 alone defines a distinct lower spinal closure defect, also with defective DLHP formation. The two genes contribute equally to closure 2, where only Grhl gene dosage is limiting. Combined deletion of Grhl2 and Grhl3 induces severe rostral and caudal neural tube defects, but DLHP-independent closure 1 proceeds normally in the upper spinal region. These findings provide a molecular basis for non-neural ectoderm mediated formation of the DLHP that is critical for complete neuraxis closure. (c) 2010 Elsevier Inc. All rights reserved.

  4. The uncertainty principle in resonant gravitational wave antennae and quantum non-demolition measurement schemes

    NASA Technical Reports Server (NTRS)

    Fortini, Pierluigi; Onofrio, Roberto; Rioli, Alessandro

    1993-01-01

    A review on the current efforts to approach and to surpass the fundamental limit in the sensitivity of the Weber type gravitational wave antennae is reported. Applications of quantum non-demolition techniques to the concrete example of an antenna resonant with the transducer are discussed in detail. Analogies and differences from the framework of the squeezed states in quantum optics are discussed.

  5. Final Programmatic Environmental Assessment: Demolition and Abandonment of Atlas and Titan Facilities Vandenberg Air Force Base, California

    DTIC Science & Technology

    2005-09-13

    in the area, with black mustard, common sowthistle ( Sonchus oleraceus ), iceplant, ripgut brome (Bromus diandrus), bur clover, and foxtail barley...dominant species are Brassica nigra, Sonchus oleraceus , Carpobrotus edulis, Bromus diandrus, Medicago polymorpha and Hordeum murinum. Demolition...multiflorum, Melotis indicus, Plantago coronopus, and Sonchus oleraceus . Survey for birds in interior prior to start of nesting (February), and exclusion if

  6. Efficacy and Safety of Transthoracic Echocardiography Alone in Transcatheter Closure of Secundum-Type Atrial Septal Defects in Adults.

    PubMed

    Ding, Cheng; Chang, Jia-Kan; Lin, Chang-Chyi; Wu, Yong-Jian; Hsieh, Kai-Sheng

    2016-04-01

    On-site transthoracic echocardiography (TTE) to guide the transcutaneous closure of secundum-type atrial septal defects (ASDs) in the catheterization laboratory remains unclear, especially in adults. Between 2005 and 2012, a total of 82 adults underwent transcutaneous closure of ASDs. The initial 15 cases underwent the procedure with both on-site transesophageal echocardiography (TEE) and TTE monitoring. Since January 2008, a total of 67 patients underwent on-site TTE alone to guide the procedure. Among the 82 adult patients who underwent a transcutaneous closure of the secundum-type ASD procedure, all had successful closure of the defects, and no periprocedural adverse complications occurred. No statistical significance was observed in the successful complete shunt closure rate between the TEE plus TTE and TTE groups during sequential follow-up (postprocedure 24 hour [87% vs. 92%],1 month [93% vs. 95%], 3 month [93% vs. 97%], and 12 month [93% vs. 97%], P > 0.05, respectively) nor was a significant difference observed between the two groups, including decreased right ventricular dimension (29.5 ± 3.3 vs. 32.0 ± 4.9 mm, 26.5 ± 3.0 vs. 28.7 ± 4.6 mm, 26.2 ± 3.1 vs. 28.2 ± 4.8 mm, and 25.6 ± 2.8 vs. 27.7 ± 4.7 mm, P > 0.05, respectively) or increased left ventricular end-diastolic dimension (41.1 ± 2.0 vs. 42.6 ± 3.0 mm, 44.3 ± 2.7 vs. 45.5 ± 3.1 mm, 44.2 ± 2.8 vs. 45.4 ± 3.1 mm, 44.9 ± 2.7 vs. 45.8 ± 2.6 mm, P > 0.05, respectively) before the procedure, and at the 3-, 6-, and 12-month follow-up evaluations. This study showed that TTE guidance alone may be considered efficacious and safe as TEE during a transcutaneous ASD occlusion procedure in select adults. © 2015, Wiley Periodicals, Inc.

  7. Progress on Footprint Reduction at the Hanford Site - 12406

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    McKenney, Dale E.; Seeley, Paul; Farabee, Al

    2012-07-01

    The Department of Energy (DOE) Office of Environmental Management (EM) continues to reduce the footprint of legacy sites throughout the EM complex. Footprint reduction is being accomplished by focusing cleanup activities on decontamination and demolition of excess contaminated facilities, soil and groundwater remediation, and solid waste disposition. All of these initiatives are being accomplished with established technologies in proven regulatory frameworks. Ultimately, completion of these environmental cleanup activities will reduce the monitoring and maintenance costs associated with managing large federal facilities, allowing EM to place more focus on other high priority cleanup efforts and facilitate a successful transition to land-termmore » stewardship of these sites. Through the American Recovery and Reinvestment Act (ARRA) investment, the Department's cleanup footprint has been reduced by 45 percent to date, from 2411 km{sup 2} (931 mi{sup 2}) to 1336 km{sup 2} (516 mi{sup 2}s). With this significant progress on footprint reduction, the Department is on track towards their goal to reduce its overall footprint by approximately 90 percent by 2015. In addition, some areas cleaned up may become available for alternate uses (i.e. recreation, conservation, preservation, industrialization or development). Much of the work to reduce the complex's footprint occurred at the Savannah River Site in South Carolina and the Hanford Site in Washington, but cleanup continues across the complex. Footprint reduction is progressing well at the Hanford Site, supported predominantly through ARRA investment. To date, 994 km{sup 2} (384 mi{sup 2}) (65%) of footprint reduction have been achieved at Hanford, with a goal to achieve a 90% reduction by Fiscal Year 2015. The DOE EM and DOE Richland Operations Office, continue to make great progress to reduce the legacy footprint of the Hanford Site. Footprint reduction is being accomplished by focusing cleanup activities on decontamination and demolition of excess facilities, both contaminated and uncontaminated, waste site cleanup activities, and debris pile removal. All of these activities can be accomplished with proven technologies and within established regulatory frameworks. Footprint reduction goals for Fiscal Year 2011 were exceeded, largely with the help of ARRA funding. As cleanup projects are completed and the total area requiring cleanup shrinks, overall costs for surveillance and maintenance operations and infrastructure services decrease. This work completion and decrease in funding requirements to maintain waste sites and antiquated facilities allows more focus on high priority site missions (i.e. groundwater remediation, tank waste disposition, etc.) and moves Site areas closer to transition from EM to the Legacy Management program. The progress in the Hanford footprint reduction effort will help achieve success in these other important mission areas. (authors)« less

  8. Superfund Record of Decision (EPA Region 8): Anaconda Smelter Site, Mill Creek, Montana (first remedial action), October 1988

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1988-10-02

    The 160-acre community of Mill Creek is located in Deerlodge County, Montana, immediately adjacent to the Anaconda Smelter NPL site. The community of Mill Creek has been contaminated for over 100 years with smelter emissions, fugitive emissions of flu dust at the smelter, and continued fugitive emissions emanating from adjacent highly contaminated soils. Settled flue emissions in the community of Mill Creek, from the now-defunct copper-smelting operation, contain arsenic, cadmium, and lead. Environmental siting of the community and biological testing of pre-school children, led EPA to conclude that contamination in the Mill Creek area poses an imminent and substantial endangermentmore » to the health of individuals residing there. The primary contaminant of concern at this site is arsenic. Cadmium and lead are secondary contaminants of concern. The selected remedial action for the site includes: permanent relocation of all residents (8 homes) with temporary erosional stabilization of disturbed areas by establishing and maintaining a vegetative cover; demolition, consolidation, and storage.« less

  9. Closure Report for Corrective Action Unit 356: Mud Pits and Disposal Sites, Nevada Test Site, Nevada with Errata Sheet

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NNSA /NV

    2002-11-12

    This Closure Report (CR) has been prepared for Corrective Action Unit (CAU) 356, Mud Pits and Disposal Sites, in accordance with the Federal Facility Agreement and Consent Order. This CAU is located in Areas 3 and 20 of the Nevada Test Site (NTS) approximately 65 miles northwest of Las Vegas, Nevada. Corrective Action Unit 356 consists of seven Corrective Action Sites (CASs): 03-04-01, Area 3 Change House Septic System; 03-09-01, Mud Pit Spill Over; 03-09-03, Mud Pit; 03-09-04, Mud Pit; 03-09-05, Mud Pit; 20-16-01, Landfill; and 20-22-21, Drums. This CR identifies and rationalizes the U.S. Department of Energy (DOE), Nationalmore » Nuclear Security Administration Nevada Operations Office's (NNSA/NV's) recommendation that no further corrective action and closure in place is deemed necessary for CAU 356. This recommendation is based on the results of field investigation/closure activities conducted November 20, 2001, through January 3, 2002, and March 11 to 14, 2002. These activities were conducted in accordance with the Streamlined Approach for Environmental Restoration Plan (SAFER) for CAU 356. For CASs 03-09-01, 03-09-03, 20-16-01, and 22-20-21, analytes detected in soil during the corrective action investigation were evaluated against Preliminary Action Levels (PALs) and it was determined that no Contaminants of Concern (COCs) were present. Therefore, no further action is necessary for the soil at these CASs. For CASs 03-04-01, 03-09-04, and 03-09-05, analytes detected in soil during the corrective action investigation were evaluated against PALs and identifies total petroleum hydrocarbons (TPHs) and radionuclides (i.e., americium-241 and/or plutonium 239/240) as COCs. The nature, extent, and concentration of the TPH and radionuclide COCs were bounded by sampling and shown to be relatively immobile. Therefore, closure in place is recommended for these CASs in CAU 356. Further, use restrictions are not required at this CAU beyond the NTS use restrictions identified in the SAFER Plan. In addition, the septic tank associated with CAU 356 will be closed in accordance with applicable regulations.« less

  10. Closure Report for Corrective Action Unit 544: Cellars, Mud Pits, and Oil Spills, Nevada National Security Site, Nevada, Revision 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Mark Krauss and Catherine Birney

    2011-05-01

    This Closure Report (CR) presents information supporting the closure of Corrective Action Unit (CAU) 544: Cellars, Mud Pits, and Oil Spills, Nevada National Security Site, Nevada. This CR complies with the requirements of the Federal Facility Agreement and Consent Order that was agreed to by the State of Nevada; U.S. Department of Energy (DOE), Environmental Management; U.S. Department of Defense; and DOE, Legacy Management. The corrective action sites (CASs) within CAU 544 are located within Areas 2, 7, 9, 10, 12, 19, and 20 of the Nevada National Security Site. Corrective Action Unit 544 comprises the following CASs: • 02-37-08,more » Cellar & Mud Pit • 02-37-09, Cellar & Mud Pit • 07-09-01, Mud Pit • 09-09-46, U-9itsx20 PS #1A Mud Pit • 10-09-01, Mud Pit • 12-09-03, Mud Pit • 19-09-01, Mud Pits (2) • 19-09-03, Mud Pit • 19-09-04, Mud Pit • 19-25-01, Oil Spill • 19-99-06, Waste Spill • 20-09-01, Mud Pits (2) • 20-09-02, Mud Pit • 20-09-03, Mud Pit • 20-09-04, Mud Pits (2) • 20-09-06, Mud Pit • 20-09-07, Mud Pit • 20-09-10, Mud Pit • 20-25-04, Oil Spills • 20-25-05, Oil Spills The purpose of this CR is to provide documentation supporting the completed corrective actions and data confirming that the closure objectives for CASs within CAU 544 were met. To achieve this, the following actions were performed: • Review the current site conditions, including the concentration and extent of contamination. • Implement any corrective actions necessary to protect human health and the environment. • Properly dispose of corrective action and investigation wastes. • Document Notice of Completion and closure of CAU 544 issued by the Nevada Division of Environmental Protection.« less

  11. Developments in life cycle assessment applied to evaluate the environmental performance of construction and demolition wastes.

    PubMed

    Bovea, M D; Powell, J C

    2016-04-01

    This paper provides a review of the literature that applies the life cycle assessment (LCA) methodology to the assessment of the environmental performance of the life cycle of construction and demolition waste (CDW) management systems. This article is focused on generating a general mapping of the literature and on identifying the best practices in compliance with LCA framework and proposing directions for future LCA studies in this field. The temporal evolution of the research in this field and the aim of the studies have grown in parallel with the legal framework related to waste and energy efficiency of buildings. Most studies have been published in Europe, followed by USA. Asia and Australia, being at an incipient application stage to the rest of the world. Topics related to "LCA of buildings, including their EoL" and "LCA of general CDW management strategies" are the most frequently analysed, followed by "LCA of EoL of construction elements" and "LCA of natural material vs recycled material". Regarding the strategies, recycling off-site and incineration, both combined with landfill for the rejected fractions, are the most commonly applied. Re-use or recycling on-site is the strategy least applied. The key aspect when LCA is applied to evaluate CDW management systems is the need to normalise which processes to include in the system boundary and the functional unit, the use of inventory data adapted to the context of the case study and the definition of a common set of appropriate impact assessment categories. Also, it is important to obtain results disaggregated by unit processes. This will allow the comparison between case studies. Copyright © 2016 Elsevier Ltd. All rights reserved.

  12. Preserving the Manhattan Project

    NASA Astrophysics Data System (ADS)

    Kelly, Cynthia

    2014-03-01

    When future generations look back on the 20th century, few events will rival the harnessing of nuclear energy as a turning point in world history, science and society. Yet, the Department of Energy has not always embraced its Manhattan Project origins. The presentation will focus on the progress made over the last 20 years to preserve the properties and first-hand accounts that for decades have been threatened with demolition and indifference. Since the mid-1950s, most remaining Manhattan Project properties at the Los Alamos National Laboratory had been abandoned. Among them was a cluster of wooden buildings called the ``V Site.'' This is where scientists assembled the ``Gadget,'' the world's first atomic device tested on July 16, 1945. Regardless of its significance, the ``V Site'' buildings like all the rest were slated for demolition. The Advisory Council on Historic Preservation (ACHP) toured the properties in November 1998. Most could not believe that the world's first atomic bomb was designed in such humble structures. The properties were declared to be ``monumental in their lack of monumentality.'' A Save America's Treasures grant for 700,000 was awarded to restore the properties. To raise the required matching funds, I left the Federal government and soon founded the Atomic Heritage Foundation. The presentation will trace the progress made over the last decade to generate interest and support nationwide to preserve the Manhattan Project heritage. Saving both the physical properties and first-hand accounts of the men and women have been a priority. Perhaps our most significant achievement may be legislation now under consideration by Congress to create a Manhattan Project National Historical Park. Seventy years later, the Manhattan Project is finally getting the recognition it deserves.

  13. 10 CFR 60.61 - Provision of information.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... characterization, siting, development, design, licensing, construction, operation, regulation, permanent closure... available at the NRC Web site, http://www.nrc.gov, and/or at the NRC Public Document Room, and copies are...

  14. Post-Closure Report for Closed Resource Conservation and Recovery Act Corrective Action Units, Nevada National Security Site, Nevada, for Fiscal Year 2014

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Silvas, Alissa J.

    2015-01-01

    This report serves as the combined annual report for post-closure activities for several Corrective Action Units (CAUs). The locations of the sites are shown in Figure 1. This report covers fiscal year 2014 (October 2013–September 2014). The post-closure requirements for these sites are described in Resource Conservation and Recovery Act Permit Number NEV HW0101 and summarized in each CAU-specific section in Section 1.0 of this report. The results of the inspections, a summary of maintenance activities, and an evaluation of monitoring data are presented in this report. Site inspections are conducted semiannually at CAUs 90 and 91 and quarterly atmore » CAUs 92, 110, 111, and 112. Additional inspections are conducted at CAU 92 if precipitation occurs in excess of 0.50 inches (in.) in a 24-hour period and at CAU 111 if precipitation occurs in excess of 1.0 in. in a 24-hour period. Inspections include an evaluation of the condition of the units, including covers, fences, signs, gates, and locks. In addition to visual inspections, soil moisture monitoring, vegetation evaluations, and subsidence surveys are conducted at CAU 110. At CAU 111, soil moisture monitoring, vegetation evaluations, subsidence surveys, direct radiation monitoring, air monitoring, radon flux monitoring, and groundwater monitoring are conducted. The results of the vegetation surveys and an analysis of the soil moisture monitoring data at CAU 110 are presented in this report. Results of additional monitoring at CAU 111 are documented annually in the Nevada National Security Site Waste Management Monitoring Report Area 3 and Area 5 Radioactive Waste Management Sites and in the Nevada National Security Site Data Report: Groundwater Monitoring Program Area 5 Radioactive Waste Management Site, which will be prepared in approximately June 2015. All required inspections, maintenance, and monitoring were conducted in accordance with the post-closure requirements of the permit. It is recommended to continue inspections and monitoring as scheduled.« less

  15. Modified Design of Anterolateral Thigh Flap for Total Pharyngolaryngectomy Reconstruction: A Single-Center Experience.

    PubMed

    Cheng, Li-Yen; Chen, Cha-Chun; Lin, Hwang-Chi; Jeng, Chu-Hsu; Lin, Shang-Hsi; Chen, Wei-Nung Jim; Lin, Yu-Hsien; Hao, Sheng-Po

    2018-07-01

    Defects after total pharyngolaryngectomy for hypopharyngeal cancer often require reconstruction via free tissue transfer. Recently, anterolateral thigh (ALT) flap has become the gold standard in many centers because of its advantages with respect to versatility, minimal donor-site morbidity, good speech quality, and relatively low fistula and anastomotic leakage rates. Moreover, ALT allows 2 surgical teams to work simultaneously. However, the height of the parallelogram in the ALT design for neoesophagus reconstruction is usually set at a minimum of 9.4 cm (circumference, 2πr) for smooth food passage. Because this height exceeds 8 cm, the donor site may not be closed primarily, which highly depends on the patient's body habitus and the skin tone or quality and requires other methods, such as local flap or skin graft for wound closure, which subsequently increase operating time and donor-site complication rate. Thus, we aimed to construct a simple and modified ALT design that will not only include the advantages described earlier but also provide adequate donor-site primary closure without jeopardizing complication rates. Ten patients with hypopharyngeal cancer underwent reconstructive surgery using our modified ALT design after total pharyngolaryngectomy between 2010 and 2017. Our modified ALT design converts this "classical" shape into a parallelogram so that the height of the modified design is always less than 8 cm, thus allowing for easy primary closure of the wound. The donor-site defects of all 10 patients were closed primarily. No donor-site complications and partial or total flap loss were observed. One patient experienced persistent wound infection with dehiscence, for which debridement was performed. The stricture and fistula rates were 10% (n = 1) and 20% (n = 2), respectively. The mean follow-up time is approximately 1 year. Minimizing donor-site morbidity is an important goal in reconstructive surgery. Our modified ALT flap design is simple, enabling easy primary closure of the donor-site defect, with improved results for the patient and operators. Furthermore, this design is also suitable for ALT flaps with widths larger than 8 cm.

  16. Closure of the R Reactor Disassembly Basin at the SRS

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Austin, W.E.

    The Facilities Disposition Division (FDD) at the Savannah River Site is engaged in planning the deactivation/closure of three of the site's five reactor disassembly basins. Activities are currently underway at R-Reactor Disassembly Basin and will continue with the P and C disassembly basins. The basins still contain the cooling and shielding water that was present when operations ceased. Low concentrations of radionuclides are present, with tritium, Cs-137, and Sr-90 being the major contributors. Although there is no evidence that any of the basins have leaked, the 50-year-old facilities will eventually contaminate the surrounding groundwaters. The FDD is pursuing a pro-activemore » solution to close the basins in-place and prevent a release to the groundwater. In-situ ion exchange is currently underway at the R-Reactor Disassembly Basin to reduce the Cs and Sr concentrations to levels that would allow release of the treated water to previously used on-site cooling ponds or to prevent ground water impact. The closure will be accomplished under CERCLA.« less

  17. 40 CFR 258.62 - Approval of site-specific flexibility requests in Indian country.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... (CONTINUED) SOLID WASTES CRITERIA FOR MUNICIPAL SOLID WASTE LANDFILLS Closure and Post-Closure Care § 258.62... waste landfill owned and operated by Lake County on the Confederated Salish and Kootenai Tribes... equivalent reduction in infiltration as the infiltration layer specified in § 258.60(a)(1) and (a)(2), and...

  18. 78 FR 75913 - Final Tank Closure and Waste Management Environmental Impact Statement for the Hanford Site...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-13

    ... Subtitle C barrier, a multi-layer barrier designed to provide 500-year protection. \\2\\ Under Tank Closure..., which means the tanks, ancillary equipment, and contaminated soil would be removed, and the remaining... Hanford barrier, a multi- layer barrier designed to provide 1,000-year protection. Alternative 6: All...

  19. VIEW OF RBC (REFINED BICARBONATE) BUILDING LOOKING NORTHEAST. DEMOLITION IN ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    VIEW OF RBC (REFINED BICARBONATE) BUILDING LOOKING NORTHEAST. DEMOLITION IN PROGRESS. "ARM & HAMMER BAKING SODA WAS MADE HERE FOR OVER 50 YEARS AND THEN SHIPPED ACROSS THE STREET TO THE CHURCH & DWIGHT PLANT ON WILLIS AVE. (ON THE RIGHT IN THIS PHOTO). LAYING ON THE GROUND IN FRONT OF C&D BUILDING IS PART OF AN RBC DRYING TOWER. - Solvay Process Company, Refined Bicarbonate Building, Between Willis & Milton Avenues, Solvay, Onondaga County, NY

  20. Journal of Special Operations Medicine, Volume 6, Edition 1, Winter 2006

    DTIC Science & Technology

    2006-01-01

    Mark A. Antonacci, MD; Paul L. Link, NC Stress Fracture and Attrition in Basic Underwater Demolition SEAL Trainees Daniel W. Trone, MA; Adriana ...Special Operations Medicine32 Stress Fracture and Attrition in Basic Underwater Demolition SEAL Trainees Daniel W. Trone, MA; Adriana Villaseñor, MPH...effects of physical activity, with a focus on functional decline and injuries in recreational and military populations. Adriana Villaseñor, MPH, is

  1. Proposed Demolition of Hangars; Projects 11-0098-11-0102 Environmental Assessment

    DTIC Science & Technology

    2012-03-22

    decrease its space and energy use • Be compliant with current land use zoning ( Industrial ) • Not violate any provisions of the National Historic... industrial usage of the hangars, contamination of shallow soil is known to exist beneath or adjacent to the structures undergoing demolition and...buildings occur in an industrial part of the base which has already been heavily disturbed due to past construction activities. The buildings proposed for

  2. Properties of Concrete Paving Blocks and Hollow Tiles with Recycled Aggregate from Construction and Demolition Wastes.

    PubMed

    Rodríguez, Carlos; Miñano, Isabel; Aguilar, Miguel Ángel; Ortega, José Marcos; Parra, Carlos; Sánchez, Isidro

    2017-11-30

    In recent years there has been an increasing tendency to recycle the wastes generated by building companies in the construction industry, demolition wastes being the most important in terms of volume. The aim of this work is to study the possibility of using recycled aggregates from construction and demolition wastes in the preparation of precast non-structural concretes. To that purpose, two different percentages (15% and 30%) of natural aggregates were substituted by recycled aggregates in the manufacture of paving blocks and hollow tiles. Dosages used by the company have not been changed by the introduction of recycled aggregate. Precast elements have been tested by means of compressive and flexural strength, water absorption, density, abrasion, and slipping resistance. The results obtained show the possibility of using these wastes at an industrial scale, satisfying the requirements of the Spanish standards for these elements.

  3. Properties of Concrete Paving Blocks and Hollow Tiles with Recycled Aggregate from Construction and Demolition Wastes

    PubMed Central

    Rodríguez, Carlos; Miñano, Isabel; Aguilar, Miguel Ángel; Parra, Carlos

    2017-01-01

    In recent years there has been an increasing tendency to recycle the wastes generated by building companies in the construction industry, demolition wastes being the most important in terms of volume. The aim of this work is to study the possibility of using recycled aggregates from construction and demolition wastes in the preparation of precast non-structural concretes. To that purpose, two different percentages (15% and 30%) of natural aggregates were substituted by recycled aggregates in the manufacture of paving blocks and hollow tiles. Dosages used by the company have not been changed by the introduction of recycled aggregate. Precast elements have been tested by means of compressive and flexural strength, water absorption, density, abrasion, and slipping resistance. The results obtained show the possibility of using these wastes at an industrial scale, satisfying the requirements of the Spanish standards for these elements. PMID:29189745

  4. Gentrification in black and white: the racial impact of public housing demolition in American cities.

    PubMed

    Goetz, Edward

    2011-01-01

    The gentrification that has transformed high-poverty neighbourhoods in US cities since the mid 1990s has been characterised by high levels of state reinvestment. Prominent among public-sector interventions has been the demolition of public housing and in some cases multimillion dollar redevelopment efforts. In this paper, the racial dimension of state-supported gentrification in large US cities is examined by looking at the direct and indirect displacement induced by public housing transformation. The data show a clear tendency towards the demolition of public housing projects with disproportionately high African American occupancy. The pattern of indirect displacement is more varied; public housing transformation has produced a number of paths of neighbourhood change. The most common, however, involve significant reductions in poverty, sometimes associated with Black to White racial turnover and sometimes not. The findings underscore the central importance of race in understanding the dynamics of gentrification in US cities.

  5. NNSS Soils Monitoring: Plutonium Valley (CAU366) FY2012

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Miller, Julianne J.; Mizell, Steve A.; Nikolich, George

    2013-01-01

    The U.S. Department of Energy (DOE) National Nuclear Security Administration (NNSA), Nevada Site Office (NSO), Environmental Restoration Soils Activity has authorized the Desert Research Institute (DRI) to conduct field assessments of potential sediment transport of contaminated soil from Corrective Action Unit (CAU) 366, Area 11 Plutonium Valley Dispersion Sites Contamination Area (CA) during precipitation runoff events. Field measurements at the T-4 Atmospheric Test Site (CAU 370) suggest that radionuclide-contaminated soils may have migrated along a shallow ephemeral drainage that traverses the site (NNSA/NSO, 2009). (It is not entirely clear how contaminated soils got into their present location at the T-4more » Site, but flow to the channel has been redirected and the contamination does not appear to be migrating at present.) Aerial surveys in selected portions of the Nevada National Security Site (NNSS) also suggest that radionuclide-contaminated soils may be migrating along ephemeral channels in Areas 3, 8, 11, 18, and 25 (Colton, 1999). In Area 11, several low-level airborne surveys of the Plutonium Valley Dispersion Sites (CAU 366) show plumes of Americium 241 (Am-241) extending along ephemeral channels (Figure 1, marker numbers 5 and 6) below Corrective Action Site (CAS) 11-23-03 (marker number 3) and CAS 11 23-04 (marker number 4) (Colton, 1999). Plutonium Valley in Area 11 of the NNSS was selected for the study because of the aerial survey evidence suggesting downstream transport of radionuclide-contaminated soil. The aerial survey (Figure 1) shows a well defined finger of elevated radioactivity (marker number 5) extending to the southwest from the southernmost detonation site (marker number 4). This finger of contamination overlies a drainage channel mapped on the topographic base map used for presentation of the survey data suggesting surface runoff as a likely cause of the contaminated area. Additionally, instrumenting sites strongly suspected of conveying soil from areas of surface contamination offers the most efficient means to confirm that surface runoff may transport radioactive contamination as a result of ambient precipitation/runoff events. Closure plans being developed for the CAUs on the NNSS may include post-closure monitoring for possible release of radioactive contaminants. Determining the potential for transport of radionuclide-contaminated soils under ambient meteorological conditions will facilitate an appropriate closure design and post-closure monitoring program.« less

  6. Intrasocket reactive soft tissue for primary closure after augmentation of extraction sites with severe bone loss before implant placement.

    PubMed

    Mardinger, Ofer; Chaushu, Gavriel; Ghelfan, Oded; Nissan, Joseph

    2009-06-01

    The normal bone resorption after tooth extraction can be significantly aggravated in the case of pre-existing severe bone loss and chronic infection. Bone augmentation procedures have been proposed, but they require adequate closure of soft tissues. We propose the use of intrasocket reactive tissue to cover extraction sites augmented by bovine bone mineral graft to promote the success of the graft procedure. The study included 24 patients with severe bone loss and chronic pathology in 27 sites. The intrasocket reactive soft tissue was elevated from the bony walls in a subperiosteal plane. Porous bovine or allograft bone mineral was placed in the extraction site without membranes, and the intrasocket reactive soft tissue was sutured over the grafting material to seal the coronal portion of the socket. Twenty-seven implants were placed 6 months after bone augmentation. Healing progressed uneventfully. Postoperative morbidity was minimal. There was no leakage or infection of the grafting material. The mean time to implant placement was 7.8 months. Supplemental augmentation was not needed. There were no implant failures. Follow-up ranged from 6 to 36 months (mean, 15 months). All implants were rehabilitated with fixed prostheses. Intrasocket reactive soft tissue can be used predictably to obtain primary closure of augmented extraction sites with severe bone loss with minimal postoperative morbidity.

  7. Effect of Unshaven Hair with Absorbable Sutures and Early Postoperative Shampoo on Cranial Surgery Site Infection.

    PubMed

    Oh, Won-Oak; Yeom, Insun; Kim, Dong-Seok; Park, Eun-Kyung; Shim, Kyu-Won

    2018-01-01

    Cranial surgical site infection is a significant cause of morbidity and mortality in hospitals. Preoperative hair shaving for cranial neurosurgical procedures is performed traditionally in an attempt to protect patients against complications from infections at cranial surgical sites. However, preoperative shaving of surgical incision sites using traditional surgical blades without properly washing the head after surgery can cause infections at surgical sites. Therefore, a rapid protocol in which the scalp remains unshaven and absorbable sutures are used for scalp closure with early postoperative shampooing is examined in this study. A retrospective comparative study was conducted from January 2008 to December 2012. A total of 2,641 patients who underwent unshaven cranial surgery with absorbable sutures for scalp closure were enrolled in this study. Data of 1,882 patients who underwent surgery with the traditional protocol from January 2005 to December 2007 were also analyzed for comparison. Of 2,641 patients who underwent cranial surgery with the rapid protocol, all but 2 (0.07%) patients experienced satisfactory wound healing. Of 1,882 patients who underwent cranial surgery with the traditional protocol, 3 patients (0.15%) had infections. Each infection occurred at the superficial incisional surgical site. Unshaven cranial surgery using absorbable sutures for scalp closure with early postoperative shampooing is safe and effective in the cranial neurosurgery setting. This protocol has a positive psychological effect. It can help patients accept neurosurgical procedures and improve their self-image after the operation. © 2017 S. Karger AG, Basel.

  8. Natural orifice transluminal endoscopic surgery gastrotomy closure with an over-the-endoscope clip: a randomized, controlled porcine study (with videos).

    PubMed

    von Renteln, Daniel; Schmidt, Arthur; Vassiliou, Melina C; Gieselmann, Maria; Caca, Karel

    2009-10-01

    Secure endoscopic closure of transgastric natural orifice transluminal endoscopic surgery (NOTES) access is of paramount importance. The over-the-scope clip (OTSC) system has previously been shown to be effective for NOTES gastrotomy closure. To compare OTSC gastrotomy closure with surgical closure. Randomized, controlled animal study. Animal facility laboratory. Thirty-six female domestic pigs. Gastrotomies were created by using a needle-knife and an 18-mm balloon. The animals were subsequently randomized to either open surgical repair with interrupted sutures or endoscopic repair with 12-mm OTSCs. In addition, pressurized leak tests were performed in ex vivo specimens of 18-mm scalpel incisions closed with suture (n = 14) and of intact stomachs (n = 10). The mean time for endoscopic closure was 9.8 minutes (range 3-22, SD 5.5). No complications occurred during either type of gastrotomy closure. At necropsy, examination of all OTSC and surgical closures demonstrated complete sealing of gastrotomy sites without evidence of injury to adjacent organs. Pressurized leak tests showed a mean burst pressure of 83 mm Hg (range 30-140, SD 27) for OTSC closures and 67 mm Hg (range 30-130, SD 27.7) for surgical sutures. Ex vivo hand-sewn sutures of 18-mm gastrotomies (n = 14) exhibited a mean burst pressure of 65 mm Hg (range 20-140, SD 31) and intact ex vivo stomachs (n = 10) had a mean burst pressure of 126 mm Hg (range 90-170, SD 28). The burst pressure of ex vivo intact stomachs was significantly higher compared with OTSC closures (P < .01), in vivo surgical closures (P < .01), and ex vivo hand-sewn closures (P < .01). There was a trend toward higher burst pressures in the OTSC closures compared with surgical closures (P = .063) and ex vivo hand-sewn closures (P = .094). In vivo surgical closures demonstrated similar burst pressures compared with ex vivo hand-sewn closures (P = .848). Nonsurvival setting. Endoscopic closure by using the OTSC system is comparable to surgical closure in a nonsurvival porcine model. This technique is easy to perform and is suitable for NOTES gastrotomy closure.

  9. Streamlined Approach for Environmental Restoration (SAFER) Plan for Corrective Action Unit 411. Double Tracks Plutonium Dispersion (Nellis), Nevada Test and Training Range, Nevada, Revision 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Matthews, Patrick K.

    2015-03-01

    This Streamlined Approach for Environmental Restoration (SAFER) Plan addresses the actions needed to achieve closure for Corrective Action Unit (CAU) 411, Double Tracks Plutonium Dispersion (Nellis). CAU 411 is located on the Nevada Test and Training Range and consists of a single corrective action site (CAS), NAFR-23-01, Pu Contaminated Soil. There is sufficient information and historical documentation from previous investigations and the 1996 interim corrective action to recommend closure of CAU 411 using the SAFER process. Based on existing data, the presumed corrective action for CAU 411 is clean closure. However, additional data will be obtained during a field investigationmore » to document and verify the adequacy of existing information, and to determine whether the CAU 411 closure objectives have been achieved. This SAFER Plan provides the methodology to gather the necessary information for closing the CAU. The results of the field investigation will be presented in a closure report that will be prepared and submitted to the Nevada Division of Environmental Protection (NDEP) for review and approval. The site will be investigated based on the data quality objectives (DQOs) developed on November 20, 2014, by representatives of NDEP, the U.S. Air Force (USAF), and the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Field Office. The DQO process was used to identify and define the type, amount, and quality of data needed to determine whether CAU 411 closure objectives have been achieved. The following text summarizes the SAFER activities that will support the closure of CAU 411; Collect environmental samples from designated target populations to confirm or disprove the presence of contaminants of concern (COCs) as necessary to supplement existing information; If COCs are no longer present, establish clean closure as the corrective action; If COCs are present, the extent of contamination will be defined and further corrective actions will be evaluated with the stakeholders (NDEP, USAF); and Confirm the preferred closure option is sufficient to protect human health and the environment.« less

  10. HANFORD SITE RIVER CORRIDOR CLEANUP

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    BAZZELL, K.D.

    2006-02-01

    In 2005, the US Department of Energy (DOE) launched the third generation of closure contracts, including the River Corridor Closure (RCC) Contract at Hanford. Over the past decade, significant progress has been made on cleaning up the river shore that bordes Hanford. However, the most important cleanup challenges lie ahead. In March 2005, DOE awarded the Hanford River Corridor Closure Contract to Washington Closure Hanford (WCH), a limited liability company owned by Washington Group International, Bechtel National and CH2M HILL. It is a single-purpose company whose goal is to safely and efficiently accelerate cleanup in the 544 km{sup 2} Hanfordmore » river corridor and reduce or eliminate future obligations to DOE for maintaining long-term stewardship over the site. The RCC Contract is a cost-plus-incentive-fee closure contract, which incentivizes the contractor to reduce cost and accelerate the schedule. At $1.9 billion and seven years, WCH has accelerated cleaning up Hanford's river corridor significantly compared to the $3.2 billion and 10 years originally estimated by the US Army Corps of Engineers. Predictable funding is one of the key features of the new contract, with funding set by contract at $183 million in fiscal year (FY) 2006 and peaking at $387 million in FY2012. Another feature of the contract allows for Washington Closure to perform up to 40% of the value of the contract and subcontract the balance. One of the major challenges in the next few years will be to identify and qualify sufficient subcontractors to meet the goal.« less

  11. Developing a Planting Medium from Solid Waste Compost and Construction and Demolition Rubble for Use in Quarry Rehabilitation

    NASA Astrophysics Data System (ADS)

    Assaf, E. A.

    2015-12-01

    The combination of construction, demolition and excavation (CDE) waste along with the increase in solid waste generation has put a major stress on Lebanon and on the management of its solid waste. Compounding this problem are the issues of quarries closure and rehabilitation and a decrease in forest and vegetative cover. This research aims to provide an integrated solution to the stated problem by developing a "soil mix" derived from a mélange of the organic matter of the solid waste (compost), the CDE waste, and soil. Excavation and construction debris were ground to several sizes and mixed with compost and soil at different ratios. Replicates of these mixes and a set of control (regular soil) were used. In this mix, native and indicator plants are planted (in pots). The plant species used are Mathiolla crassifolia and Zea mays (Corn). Results have shown successful growth of both corn and Mathiolla seedlings in the mixes with higher amounts of construction rubble and compost i.e. Rubble: Soil: Compost Ratio of 2:1:1 and 1:0:1. However treatments with no compost and with less quantities of rubble demonstrated the inability of the soil used to sustain plant growth alone (1:1:1 and 1:1:0). Last but not least, the control consisting of soil only ended up being the weakest mix with yellow corn leaves and small Mathiolla seedlings fifty days after planting and fertilizing. Additionally, soil analysis, rubble and compost analysis were conducted. The samples were tested for heavy metals, nutrient availability and values of pH and EC. No contamination has been reported and an abundance of macronutrients and micronutrients was documented for the soil and compost. High alkalinity is due to the presence of concrete and the high percentage of Calcium Carbonate in Lebanese soils. Accordingly, the most adequate mixes for planting are treatments A (2:1:1) and B (1:0:1) and they should be pursued for a pilot scale study to test their potential use in quarry rehabilitation and eventually urban agriculture.

  12. Infering and Calibrating Triadic Closure in a Dynamic Network

    NASA Astrophysics Data System (ADS)

    Mantzaris, Alexander V.; Higham, Desmond J.

    In the social sciences, the hypothesis of triadic closure contends that new links in a social contact network arise preferentially between those who currently share neighbours. Here, in a proof-of-principle study, we show how to calibrate a recently proposed evolving network model to time-dependent connectivity data. The probabilistic edge birth rate in the model contains a triadic closure term, so we are also able to assess statistically the evidence for this effect. The approach is shown to work on data generated synthetically from the model. We then apply this methodology to some real, large-scale data that records the build up of connections in a business-related social networking site, and find evidence for triadic closure.

  13. NNSS Soils Monitoring: Plutonium Valley (CAU 366) FY2016

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Nikolich, George; Mizell, Steve; McCurdy, Greg

    2017-10-01

    Desert Research Institute (DRI) is conducting a field assessment of the potential for contaminated soil transport from the Plutonium Valley Contamination Area (CA) as a result of wind transport and storm runoff in support of National Nuclear Security Administration (NNSA) efforts to complete regulatory closure of the contamination areas. The DRI work is intended to confirm the likely mechanism(s) of transport and determine the meteorological conditions that might cause movement of contaminated soils. The emphasis of the work is on collecting sediment transported by channelized storm runoff at the Plutonium Valley investigation sites. These data will inform closure plans thatmore » are being developed, which will facilitate the appropriate closure design and post-closure monitoring.« less

  14. CIRSE Vascular Closure Device Registry

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Reekers, Jim A., E-mail: j.a.reekers@amc.uva.nl; Mueller-Huelsbeck, Stefan; Libicher, Martin

    2011-02-15

    Purpose: Vascular closure devices are routinely used after many vascular interventional radiology procedures. However, there have been no major multicenter studies to assess the safety and effectiveness of the routine use of closure devices in interventional radiology. Methods: The CIRSE registry of closure devices with an anchor and a plug started in January 2009 and ended in August 2009. A total of 1,107 patients were included in the registry. Results: Deployment success was 97.2%. Deployment failure specified to access type was 8.8% [95% confidence interval (95% CI) 5.0-14.5] for antegrade access and 1.8% (95% CI 1.1-2.9) for retrograde access (Pmore » = 0.001). There was no difference in deployment failure related to local PVD at the access site. Calcification was a reason for deployment failure in only <0.5% of patients. Postdeployment bleeding occurred in 6.4%, and most these (51.5%) could be managed with light manual compression. During follow-up, other device-related complications were reported in 1.3%: seven false aneurysms, three hematoma >5.9 cm, and two vessel occlusions. Conclusion: The conclusion of this registry of closure devices with an anchor and a plug is that the use of this device in interventional radiology procedures is safe, with a low incidence of serious access site complications. There seems to be no difference in complications between antegrade and retrograde access and other parameters.« less

  15. CIRSE Vascular Closure Device Registry

    PubMed Central

    Müller-Hülsbeck, Stefan; Libicher, Martin; Atar, Eli; Trentmann, Jens; Goffette, Pierre; Borggrefe, Jan; Zeleňák, Kamil; Hooijboer, Pieter; Belli, Anna-Maria

    2010-01-01

    Purpose Vascular closure devices are routinely used after many vascular interventional radiology procedures. However, there have been no major multicenter studies to assess the safety and effectiveness of the routine use of closure devices in interventional radiology. Methods The CIRSE registry of closure devices with an anchor and a plug started in January 2009 and ended in August 2009. A total of 1,107 patients were included in the registry. Results Deployment success was 97.2%. Deployment failure specified to access type was 8.8% [95% confidence interval (95% CI) 5.0–14.5] for antegrade access and 1.8% (95% CI 1.1–2.9) for retrograde access (P = 0.001). There was no difference in deployment failure related to local PVD at the access site. Calcification was a reason for deployment failure in only <0.5% of patients. Postdeployment bleeding occurred in 6.4%, and most these (51.5%) could be managed with light manual compression. During follow-up, other device-related complications were reported in 1.3%: seven false aneurysms, three hematoma >5.9 cm, and two vessel occlusions. Conclusion The conclusion of this registry of closure devices with an anchor and a plug is that the use of this device in interventional radiology procedures is safe, with a low incidence of serious access site complications. There seems to be no difference in complications between antegrade and retrograde access and other parameters. PMID:20981425

  16. 10 CFR 960.5-2-10 - Hydrology.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... OF ENERGY GENERAL GUIDELINES FOR THE PRELIMINARY SCREENING OF POTENTIAL SITES FOR A NUCLEAR WASTE REPOSITORY Preclosure Guidelines Ease and Cost of Siting, Construction, Operation, and Closure § 960.5-2-10... site will (1) be compatible with the activities required for repository construction, operation, and...

  17. 10 CFR 960.5-2-10 - Hydrology.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... OF ENERGY GENERAL GUIDELINES FOR THE PRELIMINARY SCREENING OF POTENTIAL SITES FOR A NUCLEAR WASTE REPOSITORY Preclosure Guidelines Ease and Cost of Siting, Construction, Operation, and Closure § 960.5-2-10... site will (1) be compatible with the activities required for repository construction, operation, and...

  18. 10 CFR 960.5-2-10 - Hydrology.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... OF ENERGY GENERAL GUIDELINES FOR THE PRELIMINARY SCREENING OF POTENTIAL SITES FOR A NUCLEAR WASTE REPOSITORY Preclosure Guidelines Ease and Cost of Siting, Construction, Operation, and Closure § 960.5-2-10... site will (1) be compatible with the activities required for repository construction, operation, and...

  19. 10 CFR 960.5-2-10 - Hydrology.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... OF ENERGY GENERAL GUIDELINES FOR THE PRELIMINARY SCREENING OF POTENTIAL SITES FOR A NUCLEAR WASTE REPOSITORY Preclosure Guidelines Ease and Cost of Siting, Construction, Operation, and Closure § 960.5-2-10... site will (1) be compatible with the activities required for repository construction, operation, and...

  20. Closure Plan for Corrective Action Unit 109: U-2bu Subsidence Crater Nevada Test Site, Nevada

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Shannon Parsons

    1999-03-01

    The U-2bu subsidence crater, Corrective Action Unit 109, will be closed in accordance with the Resource Conservation and Recovery Act, the Nevada Division of Environmental Protection operational permit, and the Federal Facilities Agreement and Consent Order. The U-2bu subsidence crater is located in Area 2 of the Nevada Test Site. It was created in 1971 by an underground nuclear test with the name Miniata. The crater has a diameter of 288 meters (944 feet) and an approximate depth of 35 meters (115 feet). The subsidence crater was used as a land disposal unit for radioactive and hazardous waste from 1973more » to 1988. Site disposal history is supported by memorandums, letters, and personnel who worked at the Nevada Test Site at the time of active disposal. Closure activities will include the excavation and disposal of impacted soil form the tip of the crater. Upon completion of excavation, verification samples will be collected to show that lead has been removed to concentrations be low regulatory action level. The area will then be backfilled and a soil flood diversion berm will be constructed, and certified by an independent professional engineer as to having followed the approved Closure Plan.« less

  1. 32 CFR Appendix A to Part 179 - Tables of the Munitions Response Site Prioritization Protocol

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 32 National Defense 1 2010-07-01 2010-07-01 false Tables of the Munitions Response Site... OF DEFENSE CLOSURES AND REALIGNMENT MUNITIONS RESPONSE SITE PRIORITIZATION PROTOCOL (MRSPP) Pt. 179, App. A Appendix A to Part 179—Tables of the Munitions Response Site Prioritization Protocol The tables...

  2. 32 CFR Appendix A to Part 179 - Tables of the Munitions Response Site Prioritization Protocol

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 32 National Defense 1 2012-07-01 2012-07-01 false Tables of the Munitions Response Site... OF DEFENSE CLOSURES AND REALIGNMENT MUNITIONS RESPONSE SITE PRIORITIZATION PROTOCOL (MRSPP) Pt. 179, App. A Appendix A to Part 179—Tables of the Munitions Response Site Prioritization Protocol The tables...

  3. 32 CFR Appendix A to Part 179 - Tables of the Munitions Response Site Prioritization Protocol

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 32 National Defense 1 2014-07-01 2014-07-01 false Tables of the Munitions Response Site... OF DEFENSE CLOSURES AND REALIGNMENT MUNITIONS RESPONSE SITE PRIORITIZATION PROTOCOL (MRSPP) Pt. 179, App. A Appendix A to Part 179—Tables of the Munitions Response Site Prioritization Protocol The tables...

  4. 32 CFR Appendix A to Part 179 - Tables of the Munitions Response Site Prioritization Protocol

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 32 National Defense 1 2011-07-01 2011-07-01 false Tables of the Munitions Response Site... OF DEFENSE CLOSURES AND REALIGNMENT MUNITIONS RESPONSE SITE PRIORITIZATION PROTOCOL (MRSPP) Pt. 179, App. A Appendix A to Part 179—Tables of the Munitions Response Site Prioritization Protocol The tables...

  5. 32 CFR Appendix A to Part 179 - Tables of the Munitions Response Site Prioritization Protocol

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 32 National Defense 1 2013-07-01 2013-07-01 false Tables of the Munitions Response Site... OF DEFENSE CLOSURES AND REALIGNMENT MUNITIONS RESPONSE SITE PRIORITIZATION PROTOCOL (MRSPP) Pt. 179, App. A Appendix A to Part 179—Tables of the Munitions Response Site Prioritization Protocol The tables...

  6. Quantum non-demolition phonon counter with a hybrid optomechnical system

    NASA Astrophysics Data System (ADS)

    Song, Qiao; Zhang, KeYe; Dong, Ying; Zhang, WeiPing

    2018-05-01

    A phonon counting scheme based on the control of polaritons in an optomechanical system is proposed. This approach permits us to measure the number of phonons in a quantum non-demolition (QND) manner for arbitrary modes not limited by the frequency matching condition as in usual photon-phonon scattering detections. The performance on phonon number transfer and quantum state transfer of the counter are analyzed and simulated numerically by taking into account all relevant sources of noise.

  7. Final Environmental Assessment Addressing Construction of a Fitness Center at Beale Air Force Base, California

    DTIC Science & Technology

    2009-10-01

    adverse impacts on geology and soils would be anticipated due to construction and demolition activities, such as grading, excavation, and...2, during construction and demolition activities would limit adverse impacts on geology and soils. Therefore, no long-term, adverse, direct or...20 99 113 70 70 99 65 70 20 Live Oak Loma Rica Tierra Buena Wheatland Lincoln Linda Marysville Olivehurst South Yuba City Yuba City Source: ESRI

  8. Final Environmental Assessment: Base-Wide Building Demolition Arnold Air Force Base, Tennessee

    DTIC Science & Technology

    2006-02-01

    Building • Engine Test Facility ( ETF )-B Exhauster • ETF -A Airside • ETF -A Exhauster • ETF -A Reefer • CE Facility • Rocket Storage • Von Karman Gas...Executive Order ESA Endangered Species Act ETF Engine Test Facility FamCamp Family Camping Area P:\\ARNOLDAFB\\333402DO42COMPLIANCE\\DEMOLITION...Fabrication Shop • Natural Resources Building • Salt Storage Building • Administration Building • Engine Test Facility ( ETF )-B Exhauster • ETF -A

  9. Environmental Assessment for Construction/Replacement Military Family Housing- Phase 5 MacDill AFB, Florida

    DTIC Science & Technology

    2003-12-01

    Action can be divided into demolition activities and construction activities. Demolition activities would include the complete removal of 13 multi...that protects those most affected by noise and that can often be achieved on a practical basis. Base activities that have the highest potential...Family Housing – Phase V MacDill AFB, Florida has been approved by the state and Federal fish and wildlife agencies. Land use on MacDill AFB

  10. Prospects of effective microorganisms technology in wastes treatment in Egypt.

    PubMed

    Shalaby, Emad A

    2011-06-01

    Sludge dewatering and treatment may cost as much as the wastewater treatment. Usually large proportion of the pollutants in wastewater is organic. They are attacked by saprophytic microorganisms, i.e. organisms that feed upon dead organic matter. Activity of organisms causes decomposition of organic matter and destroys them, where the bacteria convert the organic matter or other constituents in the wastewater to new cells, water, gases and other products. Demolition activities, including renovation/remodeling works and complete or selective removal/demolishing of existing structures either by man-made processes or by natural disasters, create an extensive amount of wastes. These demolition wastes are characterized as heterogeneous mixtures of building materials that are usually contaminated with chemicals and dirt. In developing countries, it is estimated that demolition wastes comprise 20% to 30% of the total annual solid wastes. In Egypt, the daily quantity of construction and demolition (C&D) waste has been estimated as 10 000 tones. That is equivalent to one third of the total daily municipal solid wastes generated per day in Egypt. The zabbaliin have since expanded their activities and now take the waste they collect back to their garbage villages where it is sorted into recyclable components: paper, plastics, rags, glass, metal and food. The food waste is fed to pigs and the other items are sold to recycling centers. This paper summarizes the wastewater and solid wastes management in Egypt now and future.

  11. The Superfund Innovative Technology Evaluation Program SUMMARY AND CLOSURE REPORT

    EPA Science Inventory

    The Superfund Innovative Technology Evaluation (SITE) Program promoted the development, commercialization, and implementation of innovative hazardous waste treatment technologies for 20 years. SITE offered a mechanism for conducting joint technology demonstration and evaluation ...

  12. Corrective Action Decision Document/Closure Report for Corrective Action Unit 541: Small Boy Nevada National Security Site and Nevada Test and Training Range, Nevada, Revision 0 with ROTC-1

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kidman, Raymond; Matthews, Patrick

    The purpose of this Corrective Action Decision Document/Closure Report is to provide justification and documentation supporting the recommendation that no further corrective action is needed for CAU 541 based on the no further action alternative listed in Table ES-1.

  13. 76 FR 36918 - Science Advisory Board Staff Office; Notification of a Public Teleconference and Meeting of the...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-23

    ... of EPA's Draft Technical Report Pertaining to Uranium and Thorium In-Situ Leach Recovery and Post... Related to Post-Closure Monitoring of Uranium In-Situ Leach/In-Situ Recovery (ISL/ISR) Sites.'' DATES: The... pertaining to Uranium In-Situ Leach Recovery--Post-Closure Stability Monitoring can be found at http://www...

  14. The Use of Split-Thickness Skin Grafts on Diabetic Foot Ulcerations: A Literature Review

    PubMed Central

    McCartan, Brant; Dinh, Thanh

    2012-01-01

    Diabetic foot ulcerations are historically difficult to treat despite advanced therapeutic modalities. There are numerous modalities described in the literature ranging from noninvasive topical wound care to more invasive surgical procedures such as primary closure, skin flaps, and skin grafting. While skin grafting provides faster time to closure with a single treatment compared to traditional topical wound treatments, the potential risks of donor site morbidity and poor wound healing unique to the diabetic state have been cited as a contraindication to its widespread use. In order to garner clarity on this issue, a literature review was undertaken on the use of split-thickness skin grafts on diabetic foot ulcers. Search of electronic databases yielded four studies that reported split-thickness skin grafts as definitive means of closure. In addition, several other studies employed split-thickness skin grafts as an adjunct to a treatment that was only partially successful or used to fill in the donor site of another plastic surgery technique. When used as the primary closure on optimized diabetic foot ulcerations, split-thickness skin grafts are 78% successful at closing 90% of the wound by eight weeks. PMID:22666573

  15. Technical Review of Retrieval and Closure Plans for the INEEL INTEC Tank Farm Facility

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bamberger, Judith A; Burks, Barry L; Quigley, Keith D

    2001-09-28

    The purpose of this report is to document the conclusions of a technical review of retrieval and closure plans for the Idaho National Energy and Environmental Laboratory (INEEL) Idaho Nuclear Technology and Engineering Center (INTEC) Tank Farm Facility. In addition to reviewing retrieval and closure plans for these tanks, the review process served as an information exchange mechanism so that staff in the INEEL High Level Waste (HLW) Program could become more familiar with retrieval and closure approaches that have been completed or are planned for underground storage tanks at the Oak Ridge National Laboratory (ORNL) and Hanford sites. Thismore » review focused not only on evaluation of the technical feasibility and appropriateness of the approach selected by INEEL but also on technology gaps that could be addressed through utilization of technologies or performance data available at other DOE sites and in the private sector. The reviewers, Judith Bamberger of Pacific Northwest National Laboratory (PNNL) and Dr. Barry Burks of The Providence Group Applied Technology, have extensive experience in the development and application of tank waste retrieval technologies for nuclear waste remediation.« less

  16. Demolition and removal of radioactively contaminated concrete soil: Aerosol control and monitoring

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Newton, G.J.; Hoover, M.D.; Grace, A.C. III

    1995-12-01

    From 1963 to 1985, two concrete-lined ponds were used to reduce the volume of radioactive liquids from the Institute`s research programs. Following withdrawal of the {open_quotes}hot ponds{close_quotes} from active use, the residual sludges and plastic liners of the ponds were removed and shipped to a radioactive waste disposal site. From 1987 to 1994, the concrete structures remained undisturbed pending environmental restoration on the site. Restoration began in 1994 and was completed in 1995. Restoration involved mechanical breakup and removal of the concrete structures and removal of areas of contaminated soils from the site. This report describes the design and resultsmore » of the aerosol control and monitoring program that was conducted to ensure protection of workers and the environment during the restoration process. The aerosol control and monitoring strategy developed for remediation of the ITRI hot ponds was successful both in preventing dispersion of radioactive dusts and in demonstrating that exposures of workers and offsite releases were within statutory limits.« less

  17. Fishing-gear restrictions and biomass gains for coral reef fishes in marine protected areas.

    PubMed

    Campbell, Stuart J; Edgar, Graham J; Stuart-Smith, Rick D; Soler, German; Bates, Amanda E

    2018-04-01

    Considerable empirical evidence supports recovery of reef fish populations with fishery closures. In countries where full exclusion of people from fishing may be perceived as inequitable, fishing-gear restrictions on nonselective and destructive gears may offer socially relevant management alternatives to build recovery of fish biomass. Even so, few researchers have statistically compared the responses of tropical reef fisheries to alternative management strategies. We tested for the effects of fishery closures and fishing gear restrictions on tropical reef fish biomass at the community and family level. We conducted 1,396 underwater surveys at 617 unique sites across a spatial hierarchy within 22 global marine ecoregions that represented 5 realms. We compared total biomass across local fish assemblages and among 20 families of reef fishes inside marine protected areas (MPAs) with different fishing restrictions: no-take, hook-and-line fishing only, several fishing gears allowed, and sites open to all fishing gears. We included a further category representing remote sites, where fishing pressure is low. As expected, full fishery closures, (i.e., no-take zones) most benefited community- and family-level fish biomass in comparison with restrictions on fishing gears and openly fished sites. Although biomass responses to fishery closures were highly variable across families, some fishery targets (e.g., Carcharhinidae and Lutjanidae) responded positively to multiple restrictions on fishing gears (i.e., where gears other than hook and line were not permitted). Remoteness also positively affected the response of community-level fish biomass and many fish families. Our findings provide strong support for the role of fishing restrictions in building recovery of fish biomass and indicate important interactions among fishing-gear types that affect biomass of a diverse set of reef fish families. © 2017 Society for Conservation Biology.

  18. Feasibility study from a randomized controlled trial of standard closure of a stoma site vs biological mesh reinforcement.

    PubMed

    2016-09-01

    Hernia formation occurs at closed stoma sites in up to 30% of patients. The Reinforcement of Closure of Stoma Site (ROCSS) randomized controlled trial is evaluating whether placement of biological mesh during stoma closure safely reduces hernia rates compared with closure without mesh, without increasing surgical or wound complications. This paper aims to report recruitment, deliverability and safety from the internal feasibility study. A multicentre, patient and assessor blinded, randomized controlled trial, delivered through surgical trainee research networks. A 90-patient internal feasibility study assessed recruitment, randomization, deliverability and early (30 day) safety of the novel surgical technique (ClinicalTrials.gov registration number NCT02238964). The feasibility study recruited 90 patients from the 104 considered for entry (45 to mesh, 45 to no mesh). Seven of eight participating centres randomized patients within 30 days of opening. Overall, 41% of stomas were created for malignant disease and 73% were ileostomies. No mesh-specific complications occurred. Thirty-one postoperative adverse events were experienced by 31 patients, including surgical site infection (9%) and postoperative ileus (6%). One mesh was removed for re-access to the abdominal cavity, for reasons unrelated to the mesh. Independent review by the Data Monitoring and Ethics Committee of adverse event data by treatment allocation found no safety concerns. Multicentre randomization to this trial of biological mesh is feasible, with no early safety concerns. Progression to the full Phase III trial has continued. ROCSS shows that trainee research networks can efficiently develop and deliver complex interventional surgical trials. Colorectal Disease © 2016 The Association of Coloproctology of Great Britain and Ireland.

  19. Risk assessment by percolation leaching tests of extensive green roofs with fine fraction of mixed recycled aggregates from construction and demolition waste.

    PubMed

    López-Uceda, Antonio; Galvín, Adela P; Ayuso, Jesús; Jiménez, José Ramón; Vanwalleghem, Tom; Peña, Adolfo

    2018-03-19

    Extensive green roofs are urban construction systems that provide thermal regulation and sound proofing for the buildings involved, in addition to providing an urban heat island mitigation or water retention. On the other hand, policies towards reduction of energy consumption, a circular economy and sustainability are core in the European Union. Motivated by this, an experimental study was carried out to evaluate the environmental risk assessment according to release levels of polluting elements on leachates of different green roof substrate mixtures based on recycled aggregates from construction and demolition waste through (i) the performance in laboratory of two procedures: compliance and percolation tests and (ii) an upscaled experimental leaching test for long-term on-site prediction. Four plots were built on a building roof and covered with autochthonous Mediterranean plants in Córdoba, South of Spain. As growing substrate, four mixtures were used of a commercial growing substrate with different proportions of a fine mixed recycled aggregate ranging from 0 to 75% by volume. The results show that these mixtures were classified as non-hazardous materials according to legal limits of the Landfill Directive 2003/33/CE. The release levels registered in extensive green roofs were lower compared to the laboratory test data. This shows how laboratory conditions can overestimate the potential pollutant effect of these materials compared to actual conditions.

  20. Estimation of the annual production and composition of C&D Debris in Galicia (Spain).

    PubMed

    Martínez Lage, Isabel; Martínez Abella, Fernando; Herrero, Cristina Vázquez; Ordóñez, Juan Luis Pérez

    2010-04-01

    One of the key aspects that must be taken into consideration within the framework of Sustainable Construction is the management of Construction and Demolition (C&D) Debris. As for other types of waste, specific handling procedures are required to manage C&D Debris; these include reduction, reuse, recycling, and if all other possibilities fail, recovery or disposal. For public planning strategies aimed at the management of C&D Debris to be effective, it is first necessary to have specific knowledge of the type of waste materials generated in a particular region. After verifying that the methods available to determine the production and composition of C&D Debris are limited, this paper presents a procedure to ascertain the production and composition of C&D Debris, in any region. The procedure utilizes data on the surface areas of newly constructed buildings, renovations and demolitions, which are estimated from available data for recent years, as well as information on the quantity of debris generated per surface area in any type of construction site, which is obtained from recently executed constructions or from the ground plans of older buildings. The method proposed here has been applied to Galicia, one of Spain's autonomous communities, for which the quantity and composition of C&D Debris have been estimated for the horizon year 2011. Copyright 2009 Elsevier Ltd. All rights reserved.

  1. Physicochemical characteristics and occupational exposure to coarse, fine and ultrafine particles during building refurbishment activities

    NASA Astrophysics Data System (ADS)

    Azarmi, Farhad; Kumar, Prashant; Mulheron, Mike; Colaux, Julien L.; Jeynes, Chris; Adhami, Siavash; Watts, John F.

    2015-08-01

    Understanding of the emissions of coarse (PM10 ≤10 μm), fine (PM2.5 ≤2.5 μm) and ultrafine particles (UFP <100 nm) from refurbishment activities and their dispersion into the nearby environment is of primary importance for developing efficient risk assessment and management strategies in the construction and demolition industry. This study investigates the release, occupational exposure and physicochemical properties of particulate matter, including UFPs, from over 20 different refurbishment activities occurring at an operational building site. Particles were measured in the 5-10,000-nm-size range using a fast response differential mobility spectrometer and a GRIMM particle spectrometer for 55 h over 8 days. The UFPs were found to account for >90 % of the total particle number concentrations and <10 % of the total mass concentrations released during the recorded activities. The highest UFP concentrations were 4860, 740, 650 and 500 times above the background value during wall-chasing, drilling, cementing and general demolition activities, respectively. Scanning electron microscopy, X-ray photoelectron spectroscopy and ion beam analysis were used to identify physicochemical characteristics of particles and attribute them to probable sources considering the size and the nature of the particles. The results confirm that refurbishment activities produce significant levels (both number and mass) of airborne particles, indicating a need to develop appropriate regulations for the control of occupational exposure of operatives undertaking building refurbishment.

  2. Endoscopic closure of duodenal perforations by using an over-the-scope clip: a randomized, controlled porcine study.

    PubMed

    von Renteln, Daniel; Rudolph, Hans-Ulrich; Schmidt, Arthur; Vassiliou, Melina C; Caca, Karel

    2010-01-01

    Duodenal perforations during diagnostic upper endoscopy are rare; however, when therapeutic techniques are performed, the reported incidence is as great as 2.8%. Surgical repair is usually mandated, but it is associated with significant morbidity and mortality. To compare closure of duodenal perforations by using an over-the-scope clip (OTSC) with a surgical closure. Randomized, controlled animal study. Animal facility laboratory. Domestic pigs (24 females). Large (10-mm) duodenal perforations were created by using an endoscopic needle-knife. The animals were randomly assigned to either open surgical repair (n=12) or endoscopic closure by using the OTSC system (n=12). Pressurized leak tests were performed during necropsy. One major bleed occurred because of a liver injury during creation of the duodenotomy. Mean time for endoscopic closure was 5 minutes (range, 3-8 min; SD +/- 2). No complications occurred during any of the closure procedures. At necropsy, all OTSC and surgical closures demonstrated complete sealing of duodenotomy sites. Pressurized leak tests demonstrated a mean burst pressure of 166 mm Hg (range, 80-260; SD +/- 65) for OTSC closures and 143 mm Hg (range, 30-300, SD +/- 83) for surgical sutures. Ex vivo intact duodenal specimens exhibited a mean burst pressure of 247 mm Hg (range, 200-300; SD +/- 35), which was significantly higher compared with in vivo OTSC and surgical closures (P < .01). There were no significant differences between burst pressures of OTSC and surgical closures (P = .461). Nonsurvival setting. Endoscopic closure of duodenal perforations by using the OTSC system is comparable with surgical closure in a nonsurvival porcine model. This technique is easy to perform and seems suitable for repairing duodenal perforations. 2010 American Society for Gastrointestinal Endoscopy. Published by Mosby, Inc. All rights reserved.

  3. 10 CFR 960.5-2-2 - Site ownership and control.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... and control. (a) Qualifying condition. The site shall be located on land for which the DOE can obtain... operation and closure will not be likely to lead to radionuclide releases to an unrestricted area greater...

  4. GOLD ACRES BIOLOGICAL HEAP DETOXIFICATION

    EPA Science Inventory

    Many active mine sites, mines in closure stage and some abandoned mines are and have utilized cyanidation to remove and recover precious metals. Discharges from these sites normally contain significant amounts of metal cyanide complexes and concentrations of thiocyanate, soluble...

  5. Corrective Action Decision Document/Closure Report for Corrective Action Unit 367: Area 10 Sedan, Ess and Uncle Unit Craters Nevada National Security Site, Nevada, Revision 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Patrick Matthews

    2011-06-01

    Corrective Action Unit 367 comprises four corrective action sites (CASs): • 10-09-03, Mud Pit • 10-45-01, U-10h Crater (Sedan) • 10-45-02, Ess Crater Site • 10-45-03, Uncle Crater Site The purpose of this Corrective Action Decision Document/Closure Report is to provide justification and documentation of the corrective actions and site closure activities implemented at CAU 367. A corrective action of closure in place with use restrictions was completed at each of the three crater CASs (10-45-01, 10-45-02, and 10-45-03); corrective actions were not required at CAS 10-09-03. In addition, a limited soil removal corrective action was conducted at the locationmore » of a potential source material release. Based on completion of these correction actions, no additional corrective action is required at CAU 367, and site closure is considered complete. Corrective action investigation (CAI) activities were performed from February 2010 through March 2011, as set forth in the Corrective Action Investigation Plan for Corrective Action Unit 367: Area 10 Sedan, Ess and Uncle Unit Craters, Nevada Test Site, Nevada. The approach for the CAI was divided into two facets: investigation of the primary release of radionuclides, and investigation of non-test or other releases (e.g., migration in washes and potential source material). Based on the proximity of the Uncle, Ess, and Sedan craters, the impact of the Sedan test on the fallout deposited from the two earlier tests, and aerial radiological surveys, the CAU 367 investigation was designed to study the releases from the three crater CASs as one combined release (primary release). Corrective Action Site 10-09-03, Mud Pit, consists of two mud pits identified at CAU 367. The mud pits are considered non-test releases or other releases and were investigated independent of the three crater CASs. The purpose of the CAI was to fulfill data needs as defined during the data quality objective (DQO) process. The CAU 367 dataset of investigation results was evaluated based on a data quality assessment. This assessment demonstrated the dataset is complete and acceptable for use in fulfilling the DQO data needs. Analytes detected during the CAI were evaluated against final action levels (FALs) established in this document. For the primary release, radiological doses exceeding the FAL of 25 millirem per year were not found to be present in the surface or shallow subsurface soil outside the default contamination boundary. However, it was assumed that radionuclides are present in subsurface media within each of the three craters (Sedan, Ess, and Uncle) due to prompt injection of radionuclides from the tests. Based on the assumption of radiological dose exceeding the FAL, corrective actions were undertaken that consisted of implementing a use restriction and posting warning signs at each crater CAS. These use restrictions were recorded in the FFACO database; the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office (NNSA/NSO) Facility Information Management System; and the NNSA/NSO CAU/CAS files. With regard to other releases, no contaminants of concern were identified at the mud pits or any of the other release locations, with one exception. Potential source material in the form of lead was found at one location. A corrective action of clean closure was implemented at this location, and verification samples indicated that no further action is necessary. Therefore, NNSA/NSO provides the following recommendations: • A Notice of Completion to NNSA/NSO is requested from the Nevada Division of Environmental Protection for closure of CAU 367. • Corrective Action Unit 367 should be promoted from Appendix III to Appendix IV of the FFACO.« less

  6. WHAT ARE THE BEST MEANS TO ASSESS SITES AND MOVE TOWARD CLOSURE, USING APPROPRIATE SITE SPECIFIC RISK EVALUATIONS?

    EPA Science Inventory

    To facilitate evaluation of existing site characterization data, ORD has developed on-line tools and models that integrate data and models into innovative applications. Forty calculators have been developed in four groups: parameter estimators, models, scientific demos and unit ...

  7. Celebrating Success: EPA Region 3 Greener Cleanup and Sustainable Reuse Award Winner: Aberdeen Proving Ground Federal Facility Superfund Site

    EPA Pesticide Factsheets

    Greener Cleanup practices were implemented as part of a successful Time-Critical Removal Action (TCRA) completed at the APG Former NIKE Missile Site which has resulted in a reduced environmental footprint, accelerated site closure, and a cost savings.

  8. Final Environmental Assessment Addressing 21st Explosive Ordinance Disposal Weapons of Mass Destruction Facilities Demolition and Expansion at Kirtland Air Force Base, New Mexico

    DTIC Science & Technology

    2011-07-01

    KIRTLAND AIR FORCE BASE, NEW MEXICO JULY 2011 Report Documentation Page Form ApprovedOMB No. 0704...Facilities Demolition and Expansion at Kirtland Air Force Base, New Mexico 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER 6. AUTHOR(S) 5d...EXPANSION KIRTLAND AIR FORCE BASE, NEW MEXICO Pursuant to the Council on Environmental Quality (CEQ) regulations for implementing procedural

  9. Environmental Assessment Proposed Demolition Plan Hill Air Force Base, Utah

    DTIC Science & Technology

    2010-04-01

    1204, Arlington VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law , no person shall be subject to a penalty...Demolition Plan Hill Air Force Base, Utah 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER 6. AUTHOR( S ) 5d. PROJECT NUMBER 5e. TASK...NUMBER 5f. WORK UNIT NUMBER 7. PERFORMING ORGANIZATION NAME( S ) AND ADDRESS(ES) United States Air Force - Air Force Material Command,Hill Air Force

  10. Procedures for Estimating the Flat-Weighted Peak Level Produced by Surface and Buried Charges

    DTIC Science & Technology

    1988-08-01

    Demolitions and Their Equivalent Weights 11 3 Blast Noise Complaint Potential 15 4 Results of Tests at Fort Lewis, WA in dB 16 5 Results of Tests at...PRODUCED BY SURFACE AND BURIED CHARGES 1 INTRODUCTION Background Blast noise from Army demolitions often causes residents of nearby communities to... blast noise were compared to measurements made at two different locations. The basic equations used in this procedure are discussed in detail in USA

  11. Use of skin stretchers for single-stage bilateral mastectomies in a dog and a cat.

    PubMed

    Miyazaki, Yuta; Aikawa, Takeshi; Shimatsu, Taichi; Nishimura, Masaaki; Sadahiro, Shigeo

    2018-04-01

    To describe the application of skin stretchers for closure of single-stage bilateral mastectomies in a dog and a cat. Clinical case report. A 12-year-old intact female Miniature Dachshund and a 13-year-old spayed female domestic short-hair cat. Skin stretchers were applied to the site of the skin adjacent to mammary glands for 2-4 days before surgery. Cable tension was adjusted every 6-8 hours to elongate the skin and to achieve primary closure of single-stage bilateral mastectomy without tension. Wound closure after single-stage bilateral mastectomy was achieved without tension or major complication in both animals. Use of skin stretchers allows primary closure of single-stage bilateral mastectomy in dogs and cats. © 2017 The American College of Veterinary Surgeons.

  12. Effect of Live Poultry Market Closure on Avian Influenza A(H7N9) Virus Activity in Guangzhou, China, 2014

    PubMed Central

    Yuan, Jun; Lau, Eric H.Y.; Li, Kuibiao; Leung, Y.H. Connie; Yang, Zhicong; Xie, Caojun; Liu, Yufei; Liu, Yanhui; Ma, Xiaowei; Liu, Jianping; Li, Xiaoquan; Chen, Kuncai; Luo, Lei; Di, Biao; Cowling, Benjamin J.; Leung, Gabriel M.; Peiris, Malik

    2015-01-01

    We assessed the effect of closing live poultry markets in China on influenza A(H7N9) virus detection and viability. Intensive sampling was carried out before, during, and after a 2-week citywide market closure; the markets were cleaned and disinfected at the beginning of the closure period. Swab samples were collected at different sites within the markets and tested for H7N9 by real-time reverse transcription PCR and culture. During the closure, H7N9 viral RNA detection and isolation rates in retail markets decreased by 79% (95% CI 64%–88%) and 92% (95% CI 58%–98%), respectively. However, viable H7N9 virus could be cultured from wastewater samples collected up to 2 days after the market closure began. Our findings indicates that poultry workers and the general population are constantly exposed to H7N9 virus at these markets and that market closure and disinfection rapidly reduces the amount of viable virus. PMID:26402310

  13. Addendum to the Closure Report for Corrective Action Unit 262: Area 25 Septic Systems and Underground Discharge Point, Nevada Test Site, Nevada

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lynn Kidman

    2008-10-01

    This document constitutes an addendum to the July 2003, Closure Report for Corrective Action Unit 262: Area 25 Septic Systems and Underground Discharge Point as described in the document Recommendations and Justifications for Modifications for Use Restrictions Established under the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office Federal Facility Agreement and Consent Order (UR Modification document) dated February 2008. The UR Modification document was approved by NDEP on February 26, 2008. The approval of the UR Modification document constituted approval of each of the recommended UR modifications.

  14. Controllable Magnetization Processes Induced by Nucleation Sites in Permalloy Rings

    NASA Astrophysics Data System (ADS)

    Chen, Ying-Jiun; Hsu, Chia-Jung; Liao, Chun-Neng; Huang, Hao-Ting; Lee, Chiun-Peng; Chiu, Yi-Hsun; Tung, Tzu-Yun; Lai, Mei-Feng

    2010-02-01

    Different arrangements of notches as nucleation sites are demonstrated experimentally and numerically to effectively control the magnetization processes of permalloy rings. In the ring with notches at the same side with respect to field direction, two same-helicity vortex domain walls in the onion state lead to two-step switching going through flux-closure state; in the ring with diagonal notches two opposite-helicity vortex domain walls lead to one-step switching skipping flux-closure state. The switching processes are repeatable in contrast to rings without notches where helicites of two vortex domain walls are random so the switching processes can not be controlled.

  15. Fat-plug myringoplasty of ear lobule vs abdominal donor sites.

    PubMed

    Acar, Mustafa; Yazıcı, Demet; San, Turhan; Muluk, Nuray Bayar; Cingi, Cemal

    2015-04-01

    The purpose of this study is to compare the success rates of fat-graft myringoplasties harvesting adipose grafts from different donor sites (ear lobule vs abdomen). The clinical records of 61 patients (24 males and 37 females) who underwent fat-plug myringoplasty (FPM) were reviewed retrospectively. Fat from ear lobule (FEL) and abdominal fat were used as graft materials. The impact of age, gender, systemic diseases, topography of the perforation, utilization of fat graft materials of different origin on the tympanic membrane closure rate and the effect of FPM on hearing gain was analyzed. Our tympanic membrane (TM) closure rate was 82 %. No statistical significant difference was observed regarding age, gender, comorbidities (septal deviation, hypertension and diabetes mellitus) or habits (smoking). Posterior TM perforations had significantly lower healing rate. The change in TM closure rate considering different adipose tissue donor sites was not statistically significant. The hearing gain of the patients was mostly below 20 dB. Fat-plug myringoplasty (FPM) is a safe, cost-effective and easy operation for selected patients. Abdominal fat graft is as effective as ear lobe fat graft on tympanic membrane healing, has cosmetic advantages and should be taken into consideration when planning fat as the graft source.

  16. Post-Closure Inspection Report for the Tonopah Test Range, Nevada. For Calendar Year 2015, Revision 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Matthews, Patrick; Petrello, Jaclyn

    This report provides the results of the annual post-closure inspections conducted at the closed corrective action units (CAUs) located on the Tonopah Test Range (TTR), Nevada. This report covers calendar year 2015 and includes inspection and repair activities completed at the following CAUs; CAU 400: Bomblet Pit and Five Points Landfill (TTR); CAU 407: Roller Coaster RadSafe Area (TTR); CAU 424: Area 3 Landfill Complexes (TTR); CAU 453: Area 9 UXO Landfill (TTR); and CAU 487: Thunderwell Site (TTR) Inspections were conducted according to the post-closure plans in the approved closure reports and subsequent correspondence with the Nevada Division ofmore » Environmental Protection. The post-closure inspection plans and subsequent correspondence modifying the requirements for each CAU are included in Appendix B. The inspection checklists are included in Appendix C. Field notes are included in Appendix D. The annual post-closure inspections were conducted on May 12, 2015. Maintenance was required at CAU 453. Cracking along the north trench was repaired. One monument is missing at CAU 424; it will be replaced in 2016. Postings at CAUs 407, 424, 453, and 487 contain contact information for TTR Security. It was noted that protocols may not be in place to ensure that the U.S. Department of Energy, National Nuclear Security Administration Nevada Field Office (NNSA/NFO) is notified if access is needed at these sites. NNSA/NFO is working with the U.S. Air Force and Sandia to determine whether more appropriate contact information or new protocols are warranted for each CAU. Based on these inspections, there has not been a significant change in vegetation, and vegetation monitoring was not recommended at CAU 400 or CAU 407 in 2015.« less

  17. Application for a Permit to Operate a Class III Solid Waste Disposal Site at the Nevada National Security Site Area 5 Asbestiform Low-Level Solid Waste Disposal Site

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NSTec Environmental Programs

    2010-10-04

    The Nevada National Security Site (NNSS) is located approximately 105 km (65 mi) northwest of Las Vegas, Nevada. The U.S. Department of Energy National Nuclear Security Administration Nevada Site Office (NNSA/NSO) is the federal lands management authority for the NNSS and National Security Technologies, LLC (NSTec) is the Management and Operations contractor. Access on and off the NNSS is tightly controlled, restricted, and guarded on a 24-hour basis. The NNSS is posted with signs along its entire perimeter. NSTec is the operator of all solid waste disposal sites on the NNSS. The Area 5 Radioactive Waste Management Site (RWMS) ismore » the location of the permitted facility for the Solid Waste Disposal Site (SWDS). The Area 5 RWMS is located near the eastern edge of the NNSS (Figure 1), approximately 26 km (16 mi) north of Mercury, Nevada. The Area 5 RWMS is used for the disposal of low-level waste (LLW) and mixed low-level waste. Many areas surrounding the RWMS have been used in conducting nuclear tests. The site will be used for the disposal of regulated Asbestiform Low-Level Waste (ALLW), small quantities of low-level radioactive hydrocarbon-burdened (LLHB) media and debris, LLW, LLW that contains Polychlorinated Biphenyl (PCB) Bulk Product Waste greater than 50 ppm that leaches at a rate of less than 10 micrograms of PCB per liter of water, and small quantities of LLHB demolition and construction waste (hereafter called permissible waste). Waste containing free liquids, or waste that is regulated as hazardous waste under the Resource Conservation and Recovery Act (RCRA) or state-of-generation hazardous waste regulations, will not be accepted for disposal at the site. Waste regulated under the Toxic Substances Control Act (TSCA) that will be accepted at the disposal site is regulated asbestos-containing materials (RACM) and PCB Bulk Product Waste greater than 50 ppm that leaches at a rate of less than 10 micrograms of PCB per liter of water. The term asbestiform is used throughout this document to describe RACM. The disposal site will be used as a depository of permissible waste generated both on site and off site. All generators designated by NNSA/NSO will be eligible to dispose regulated ALLW at the Asbestiform Low-Level Waste Disposal Site in accordance with the DOE/NV-325, Nevada National Security Site Waste Acceptance Criteria (NNSSWAC, current revision). Approval will be given by NNSA/NSO to generators that have successfully demonstrated through process knowledge (PK) and/or sampling and analysis that the waste is low-level, contains asbestiform material, or contains PCB Bulk Product Waste greater than 50 ppm that leaches at a rate of less than 10 micrograms of PCB per liter of water, or small quantities of LLHB demolition and construction waste and does not contain prohibited waste materials. Each waste stream will be approved through the Radioactive Waste Acceptance Program (RWAP), which ensures that the waste meets acceptance requirements outlined in the NNSSWAC.« less

  18. CYANIDE HEAP BILOGICAL DETOXIFICATION - PHASE II

    EPA Science Inventory

    Many active mine sites, mines in closure stage and some abandoned mines are and have utilized cyanidation to remove and recover precious metals. Discharges from these sites normally contain significant amounts of metal cyanide complexes and concentrations of thiocyanate, soluble...

  19. CYANIDE HEAP BIOLOGICAL DETOXIFICATION - PHASE II

    EPA Science Inventory

    Many active mine sites, mines in the closure stage and some abandoned mines are and have utilized cyanidation to remove and recover precious metals. Discharges from these sites normally contain significant amounts of metal cyanide complexes and concentrations of thiocyanate, solu...

  20. Initial experience with the Cardiva Boomerang vascular closure device in diagnostic catheterization.

    PubMed

    Doyle, Brendan J; Godfrey, Michael J; Lennon, Ryan J; Ryan, James L; Bresnahan, John F; Rihal, Charanjit S; Ting, Henry H

    2007-02-01

    The authors studied the safety and efficacy of the Cardiva Boomerang vascular closure device in patients undergoing diagnostic cardiac catheterization. Conventional vascular closure devices (sutures, collagen plugs, or metal clips) have been associated with catastrophic complications including arterial occlusion and foreign body infections; furthermore, they cannot be utilized in patients with peripheral vascular disease or vascular access site in a vessel other than the common femoral artery. The Cardiva Boomerang device facilitates vascular hemostasis without leaving any foreign body behind at the access site, can be used in peripheral vascular disease, and can be used in vessels other than the common femoral artery A total of 96 patients undergoing transfemoral diagnostic cardiac catheterization were included in this study, including 25 (26%) patients with contraindications to conventional closure devices. Femoral angiography was performed prior to deployment of the Cardiva Boomerang closure device. Patients were ambulated at 1 hr after hemostasis was achieved. The device was successfully deployed and hemostasis achieved with the device alone in 95 (99%) patients. The device failed to deploy in 1 (1%) patient and required conversion to standard manual compression. Minor complications were observed in 5 (5%) patients. No patients experienced major complications including femoral hematoma > 4 cm, red blood cell transfusion, retroperitoneal bleed, arteriovenous fistula, pseudoaneurysm, infection, arterial occlusion, or vascular surgery. The Cardiva Boomerang device is safe and effective in patients undergoing diagnostic cardiac catheterization using the transfemoral approach, facilitating early ambulation with low rates of vascular complications. (c) 2006 Wiley-Liss, Inc.

  1. Quantum demolition filtering and optimal control of unstable systems.

    PubMed

    Belavkin, V P

    2012-11-28

    A brief account of the quantum information dynamics and dynamical programming methods for optimal control of quantum unstable systems is given to both open loop and feedback control schemes corresponding respectively to deterministic and stochastic semi-Markov dynamics of stable or unstable systems. For the quantum feedback control scheme, we exploit the separation theorem of filtering and control aspects as in the usual case of quantum stable systems with non-demolition observation. This allows us to start with the Belavkin quantum filtering equation generalized to demolition observations and derive the generalized Hamilton-Jacobi-Bellman equation using standard arguments of classical control theory. This is equivalent to a Hamilton-Jacobi equation with an extra linear dissipative term if the control is restricted to Hamiltonian terms in the filtering equation. An unstable controlled qubit is considered as an example throughout the development of the formalism. Finally, we discuss optimum observation strategies to obtain a pure quantum qubit state from a mixed one.

  2. Closed-loop recycling of construction and demolition waste in Germany in view of stricter environmental threshold values.

    PubMed

    Weil, Marcel; Jeske, Udo; Schebek, Liselotte

    2006-06-01

    Recycling of construction and demolition waste contributes decisively to the saving of natural mineral resources. In Germany, processed mineral construction and demolition waste from structural engineering is used nearly exclusively in civil engineering (earthwork and road construction sector) as open-loop recycling. Due to the planned stricter limit values for the protection of soil and water, however, this recycling path in civil engineering may no longer be applicable in the future. According to some new guidelines and standards adopted recently, recycled aggregates may also be used for concrete production in the structural engineering sector (closed-loop recycling). Wastes from the structural engineering sector can thus be kept in a closed cycle, and their disposal on a landfill can be avoided. The present report focuses on the determination of maximum waste volumes that may be handled by this new recycling option. Potential adverse effects on the saving of resources and climate protection have been analysed. For this purpose, materials flow analysis and ecobalancing methods have been used.

  3. Construction and demolition waste as a source of PVC for recycling.

    PubMed

    Prestes, Sabrina Moretto Darbello; Mancini, Sandro Donnini; Rodolfo, Antonio; Keiroglo, Raquel Carramillo

    2012-02-01

    Construction and demolition waste can contain considerable amounts of polyvinyl chloride (PVC). This paper describes a study of the recycling of PVC pipes collected from such waste materials. In a sorting facility for the specific disposal of construction and demolition waste, PVC was found to represent one-third of the plastics separated by workers. Pipes were sorted carefully to preclude any possible contamination by poly(ethylene terephthalate) (PET) found in the waste. The material was ground into two distinct particle sizes (final mesh of 12.7 and 8 mm), washed, dried and recycled. The average formulation of the pipes was determined based on ash content tests and used in the fabrication of a similar compound made mainly of virgin PVC. Samples of recycled pipes and of compound based on virgin material were subjected to tensile and impact tests and provided very similar results. These results are a good indication of the application potential of the recycled material and of the fact that longer grinding to obtain finer particles is not necessarily beneficial.

  4. An integrated approach for the management of demolition waste in Cyprus.

    PubMed

    Kourmpanis, Basilis; Papadopoulos, Achilleas; Moustakas, Konstantinos; Kourmoussis, Fotis; Stylianou, Marinos; Loizidou, Maria

    2008-12-01

    This study investigated the generation and management of demolition waste (DW) in Cyprus. A methodology has been developed and applied for the estimation of the quantities of the waste stream under examination, since quantitative primary data were not available. The existing situation relating to the practices applied for the management of DW was investigated and assessed. Furthermore, a multi-criteria analysis method (PROMETHEE II) was developed and applied in order to examine alternative systems that could be implemented for the management of the DW in the country. In particular, nine management systems (scenarios) were examined, evaluated and ranked according to their efficiency using seventeen individual criteria, divided into four groups (social-legislative, environmental, economic and technical). The ranking of the alternative waste management scenarios indicated that the optimum management system for possible implementation in the island included complete selective demolition procedures and transfer of mixed recyclable materials to the recycling centre and non-recyclable material to landfill.

  5. Spectrophotometric analyses of hexahydro-1,3,5-trinitro-1,3,5-triazine (RDX) in water.

    PubMed

    Shi, Cong; Xu, Zhonghou; Smolinski, Benjamin L; Arienti, Per M; O'Connor, Gregory; Meng, Xiaoguang

    2015-07-01

    A simple and accurate spectrophotometric method for on-site analysis of royal demolition explosive (RDX) in water samples was developed based on the Berthelot reaction. The sensitivity and accuracy of an existing spectrophotometric method was improved by: replacing toxic chemicals with more stable and safer reagents; optimizing the reagent dose and reaction time; improving color stability; and eliminating the interference from inorganic nitrogen compounds in water samples. Cation and anion exchange resin cartridges were developed and used for sample pretreatment to eliminate the effect of ammonia and nitrate on RDX analyses. The detection limit of the method was determined to be 100 μg/L. The method was used successfully for analysis of RDX in untreated industrial wastewater samples. It can be used for on-site monitoring of RDX in wastewater for early detection of chemical spills and failure of wastewater treatment systems. Copyright © 2015. Published by Elsevier B.V.

  6. Environmental Assessment for the Consolidation of 88th Air Base Wing Civil Engineer Operations, Wright-Patterson AFB, Ohio

    DTIC Science & Technology

    2012-09-01

    with the WPAFB General Plan, sufficient space available to meet  current capacity with additional room for future  growth , minimal site preparation...demolition of F/20745, the  site would be graded and seeded to  grass  and would not impact surface or subsurface soils.   Land Use  Facilities 30022 and...be graded and seeded to  grass .  There is no unique visual quality of the surrounding areas affected by implementing the CE  consolidation project

  7. Closure Report for Corrective Action Unit 166: Storage Yards and Contaminated Materials, Nevada Test Site, Nevada

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NSTec Environmental Restoration

    2009-08-01

    Corrective Action Unit (CAU) 166 is identified in the Federal Facility Agreement and Consent Order (FFACO) as 'Storage Yards and Contaminated Materials' and consists of the following seven Corrective Action Sites (CASs), located in Areas 2, 3, 5, and 18 of the Nevada Test Site: CAS 02-42-01, Condo Release Storage Yd - North; CAS 02-42-02, Condo Release Storage Yd - South; CAS 02-99-10, D-38 Storage Area; CAS 03-42-01, Conditional Release Storage Yard; CAS 05-19-02, Contaminated Soil and Drum; CAS 18-01-01, Aboveground Storage Tank; and CAS 18-99-03, Wax Piles/Oil Stain. Closure activities were conducted from March to July 2009 according tomore » the FF ACO (1996, as amended February 2008) and the Corrective Action Plan for CAU 166 (U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office, 2007b). The corrective action alternatives included No Further Action and Clean Closure. Closure activities are summarized. CAU 166, Storage Yards and Contaminated Materials, consists of seven CASs in Areas 2, 3, 5, and 18 of the NTS. The closure alternatives included No Further Action and Clean Closure. This CR provides a summary of completed closure activities, documentation of waste disposal, and confirmation that remediation goals were met. The following site closure activities were performed at CAU 166 as documented in this CR: (1) At CAS 02-99-10, D-38 Storage Area, approximately 40 gal of lead shot were removed and are currently pending treatment and disposal as MW, and approximately 50 small pieces of DU were removed and disposed as LLW. (2) At CAS 03-42-01, Conditional Release Storage Yard, approximately 7.5 yd{sup 3} of soil impacted with lead and Am-241 were removed and disposed as LLW. As a BMP, approximately 22 ft{sup 3} of asbestos tile were removed from a portable building and disposed as ALLW, approximately 55 gal of oil were drained from accumulators and are currently pending disposal as HW, the portable building was removed and disposed as LLW, and accumulators, gas cylinders, and associated debris were removed and are currently pending treatment and disposal as MW. (3) At CAS 05-19-02, Contaminated Soil and Drum, as a BMP, an empty drum was removed and disposed as sanitary waste. (4) At CAS 18-01-01, Aboveground Storage Tank, approximately 165 gal of lead-impacted liquid were removed and are currently pending disposal as HW, and approximately 10 gal of lead shot and 6 yd{sup 3} of wax embedded with lead shot were removed and are currently pending treatment and disposal as MW. As a BMP, approximately 0.5 yd{sup 3} of wax were removed and disposed as hydrocarbon waste, approximately 55 gal of liquid were removed and disposed as sanitary waste, and two metal containers were grouted in place. (5) At CAS 18-99-03, Wax Piles/Oil Stain, no further action was required; however, as a BMP, approximately l.5 yd{sup 3} of wax were removed and disposed as hydrocarbon waste, and one metal container was grouted in place.« less

  8. Estimation of recharge through selected drainage wells and potential effects from well closure, Orange County, Florida

    USGS Publications Warehouse

    Bradner, L.A.

    1996-01-01

    Drainage wells have been used in Orange County, Florida, and surrounding areas to alleviate flooding and to control lake levels since 1904. Over 400 drainage wells have been drilled in the county, but many are now redundant because of surface drainage systems that have been installed within the last two or three decades. Most of the drainage wells emplace water into the Upper Floridan aquifer, a zone of high transmissivity within the Floridan aquifer system. In 1992, the Orange County Stormwater Management Department identified 23 wells that were considered noncritical or redundant for current drainage control. These wells were targeted for closure to eliminate maintenance and possible contamination problems. A 3-year study (1992 through 1994) encompassed several drainage basins in the county. Inflow to 18 of the 23 drainage wells on the noncritical list and the effects of closure of these noncritical wells on the potentiometric surface of the Upper Floridan aquifer were estimated. Three sites were chosen for intensive study and were used for further extrapolation to other noncritical sites. The total average annual recharge rate through the 18 selected wells was estimated to be 9 cubic feet per second, or about 6 million gallons per day. The highest rate of long-term recharge, 4.6 cubic feet per second, was to well H-35. Several wells on the noncritical list were already plugged or had blocked intakes. Yields, or the sum of surface-water outflows and drainage-well recharge, from the drainage basins ranged from 20 to 33 inches per year. In some of the basins, all the yield from the basin was recharge through a drainage well. In other basins, most of the yield was surface outflow through canals rather than to drainage wells. The removal of the recharge from closure of the wells was simulated by superposition in a three-dimensional ground-water flow model. As a second step in the model, water was also applied to two sites in western Orange County that could receive redirected surface water. One of the sites is CONSERV II, a distribution system used to apply reclaimed water to the surficial aquifer system through rapid infiltration basins and grove irrigation. The second site, Lake Sherwood, has an extremely high downward recharge rate estimated to be at least 54 inches per year. The results from the simulations showed a decline of 1 foot or less in the potentiometric surface of the Upper Floridan aquifer with removal of the recharge and a mound of about 1 foot in the vicinity of the two sites in western Orange County. The Lake Sherwood site seems to reduce the declines caused by closure of the wells to a greater degree than the CONSERV II site, partly because the Lake Sherwood site is closer to the drainage-well basins.

  9. Release of ultrafine particles from three simulated building processes

    NASA Astrophysics Data System (ADS)

    Kumar, Prashant; Mulheron, Mike; Som, Claudia

    2012-03-01

    Building activities are recognised to produce coarse particulate matter but less is known about the release of airborne ultrafine particles (UFPs; those below 100 nm in diameter). For the first time, this study has investigated the release of particles in the 5-560 nm range from three simulated building activities: the crushing of concrete cubes, the demolition of old concrete slabs, and the recycling of concrete debris. A fast response differential mobility spectrometer (Cambustion DMS50) was used to measure particle number concentrations (PNC) and size distributions (PNDs) at a sampling frequency of 10 Hz in a confined laboratory room providing controlled environment and near-steady background PNCs. The sampling point was intentionally kept close to the test samples so that the release of new UFPs during these simulated processes can be quantified. Tri-modal particle size distributions were recorded for all cases, demonstrating different peak diameters in fresh nuclei (<10 nm), nucleation (10-30 nm) and accumulation (30-300 nm) modes for individual activities. The measured background size distributions showed modal peaks at about 13 and 49 nm with average background PNCs 1.47 × 104 cm-3. These background modal peaks shifted towards the larger sizes during the work periods (i.e. actual experiments) and the total PNCs increased between 2 and 17 times over the background PNCs for different activities. After adjusting for background concentrations, the net release of PNCs during cube crushing, slab demolition, and `dry' and `wet' recycling events were measured as 0.77, 19.1, 22.7 and 1.76 (×104) cm-3, respectively. The PNDs were converted into particle mass concentrations (PMCs). While majority of new PNC release was below 100 nm (i.e. UFPs), the bulk of new PMC emissions were constituted by the particles over 100 nm; 95, 79, 73 and 90% of total PNCs, and 71, 92, 93 and 91% of total PMCs, for cube crushing, slab demolition, dry recycling and wet recycling, respectively. The results of this study firmly elucidate the release of UFPs and raise a need for further detailed studies and designing health and safety related exposure guidelines for laboratory workplaces and operational building sites.

  10. DESIGNING AN OPPORTUNITY FUEL WITH BIOMASS AND TIRE-DERIVED FUEL FOR COFIRING AT WILLOW ISLAND GENERATING STATION

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    K. Payette; D. Tillman

    During the period October 1, 2000 - December 31, 2000, Allegheny Energy Supply Co., LLC (Allegheny) executed a Cooperative Agreement with the National Energy Technology Laboratory to implement a major cofiring demonstration at the Willow Island Generating Station Boiler No.2. Willow Island Boiler No.2 is a cyclone boiler. Allegheny also will demonstrate separate injection cofiring at the Albright Generating Station Boiler No.3, a tangentially fired boiler. The Allegheny team includes Foster Wheeler as its primary subcontractor. Additional subcontractors are Cofiring Alternatives and N.S. Harding and Associates. This report summarizes the activities associated with the Designer Opportunity Fuel program, and demonstrationsmore » at Willow Island and Albright Generating Stations. The second quarter of the project involved completing the designs for each location. Further, geotechnical investigations proceeded at each site. Preparations were made to perform demolition on two small buildings at the Willow Island site. Fuels strategies were initiated for each site. Test planning commenced for each site. A groundbreaking ceremony was held at the Willow Island site on October 18, with Governor C. Underwood being the featured speaker.« less

  11. A reliable and safe gastrotomy closure technique assessed in a porcine survival model pilot study: success of the Queen's closure.

    PubMed

    Hookey, L C; Bielawska, B; Samis, A; Jalink, D; Ellis, R; Khokhotva, V; Hurlbut, D; Mercer, D

    2009-06-01

    The evolution of NOTES to clinical implementation has been hampered by lack of a reliable, safe, and easy-to-implement technique for closure of the opening created in accessing the peritoneum. The Queen's closure uses a combination of endoscopic clips and loop devices to seal such defects in the stomach wall. This study aimed to assess the Queen's closure in a porcine survival model. Five 30-kg pigs underwent endoscopic transgastric surgery with exploration of the peritoneum. The endoscope was then withdrawn back into the stomach and the closure performed. The animals were recovered, monitored closely, and underwent endoscopy 1 week after surgery. They were then euthanized at 2 (n = 2) and 3 (n = 3) weeks after surgery with subsequent necropsy. The mean procedure time (from intubation of the esophagus to withdrawal of the endoscope) was 79 minutes (range 45-105 minutes) with a mean time of exploration of the peritoneum of 14 minutes (range 8-25 minutes). All animals recovered well with no apparent pain, distress, or signs of infection. Endoscopic examination 1 week after surgery revealed all the closures to be intact and only identifiable by a small ulcer. At necropsy, the gastrotomy site was identifiable only by minor serosal adhesions. Histological study demonstrated full-thickness closure with minimal inflammation. The Queen's closure is a reliable and safe technique that provides full-thickness gastrotomy closure without any observed complications. The technique has proven to be transferable knowledge that holds promise for clinical implementation.

  12. C. elegans epidermal wounding induces a mitochondrial ROS burst that promotes wound repair

    PubMed Central

    Xu, Suhong; Chisholm, Andrew D.

    2014-01-01

    SUMMARY Reactive oxygen species (ROS) such as hydrogen peroxide are generated at wound sites and act as long-range signals in wound healing. The roles of other ROS in wound repair are little explored. Here we reveal a cytoprotective role for mitochondrial ROS (mtROS) in C. elegans skin wound healing. We show that skin wounding causes local production of mtROS superoxide at the wound site. Inhibition of mtROS levels by mitochondrial superoxide-specific antioxidants blocks actin-based wound closure, whereas elevation of mtROS promotes wound closure and enhances survival of mutant animals defective in wound healing. mtROS act downstream of wound-triggered Ca2+ influx. We find that the Mitochondrial Calcium Uniporter MCU-1 is essential for rapid mitochondrial Ca2+ uptake and mtROS production after wounding. mtROS can promote wound closure by local inhibition of Rho GTPase activity via a redox-sensitive motif. These findings delineate a pathway acting via mtROS that promotes cytoskeletal responses in wound healing. PMID:25313960

  13. Post-Closure Report for Closed Resource Conservation and Recovery Act Corrective Action Units, Nevada National Security Site, Nevada: For Fiscal Year 2015 (October 2014–September 2015), Revision 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Matthews, Patrick

    This report serves as the combined annual report for post-closure activities for the following closed corrective action units (CAUs); CAU 90, Area 2 Bitcutter Containment; CAU 91, Area 3 U-3fi Injection Well; CAU 92, Area 6 Decon Pond Facility; CAU 110, Area 3 WMD U-3ax/bl Crater; CAU 111, Area 5 WMD Retired Mixed Waste Pits; and CAU 112, Area 23 Hazardous Waste Trenches. This report covers fiscal year 2015 (October 2014 through September 2015). The post-closure requirements for these sites are described in Resource Conservation and Recovery Act Permit Number NEV HW0101 and are summarized in each CAU-specific section inmore » Section 1.0 of this report. The results of the inspections, a summary of maintenance activities, and an evaluation of monitoring data are presented in this report.« less

  14. Multi-criteria assessment of socio-environmental aspects in shrinking cities. Experiences from eastern Germany

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Schetke, Sophie; Haase, Dagmar

    Demographic change and economic decline produce modified urban land use pattern and densities. Compared to the beginning of the 90s after the German reunification, nowadays massive housing and commercial vacancies followed by demolition and perforation come to pass in many cities of the former GDR. In consequence, a considerable surplus of urban brownfields has been created. Furthermore, the decline in the urban fabric affects social infrastructure and urban greenery of local neighbourhoods. Here, urban planning enters into 'uncharted territory' since it needs to assess the socio-environmental impact of shrinkage. In order to carry out such an evaluation quantitatively, a multi-criteriamore » assessment scheme (MCA) was developed and applied. Firstly, we identified infrastructure and land use changes related to vacancy and demolition. Secondly, demolition scenarios for the coming 20 years were applied in order to give an idea for a long-term monitoring approach at the local district level. A multi-criteria indicator matrix quantifies the socio-environmental impact on both urban greenery and residents. Using it, we set demolition scenarios against urban 'quality of life' targets. Empirical evidence comes from Leipzig, in eastern Germany, a representative case study for urban shrinkage processes. The results show that shrinkage implies socio-environmental changes of residential livelihoods, however, does not simply increase or decrease the overall urban quality of life. The integrated assessment of all indicators identifies environmental and social opportunities, as well as the challenges a shrinking city is faced with.« less

  15. Prospects of effective microorganisms technology in wastes treatment in Egypt

    PubMed Central

    Shalaby, Emad A

    2011-01-01

    Sludge dewatering and treatment may cost as much as the wastewater treatment. Usually large proportion of the pollutants in wastewater is organic. They are attacked by saprophytic microorganisms, i.e. organisms that feed upon dead organic matter. Activity of organisms causes decomposition of organic matter and destroys them, where the bacteria convert the organic matter or other constituents in the wastewater to new cells, water, gases and other products. Demolition activities, including renovation/remodeling works and complete or selective removal/demolishing of existing structures either by man-made processes or by natural disasters, create an extensive amount of wastes. These demolition wastes are characterized as heterogeneous mixtures of building materials that are usually contaminated with chemicals and dirt. In developing countries, it is estimated that demolition wastes comprise 20% to 30% of the total annual solid wastes. In Egypt, the daily quantity of construction and demolition (C&D) waste has been estimated as 10 000 tones. That is equivalent to one third of the total daily municipal solid wastes generated per day in Egypt. The zabbaliin have since expanded their activities and now take the waste they collect back to their garbage villages where it is sorted into recyclable components: paper, plastics, rags, glass, metal and food. The food waste is fed to pigs and the other items are sold to recycling centers. This paper summarizes the wastewater and solid wastes management in Egypt now and future. PMID:23569767

  16. An estimation framework for building information modeling (BIM)-based demolition waste by type.

    PubMed

    Kim, Young-Chan; Hong, Won-Hwa; Park, Jae-Woo; Cha, Gi-Wook

    2017-12-01

    Most existing studies on demolition waste (DW) quantification do not have an official standard to estimate the amount and type of DW. Therefore, there are limitations in the existing literature for estimating DW with a consistent classification system. Building information modeling (BIM) is a technology that can generate and manage all the information required during the life cycle of a building, from design to demolition. Nevertheless, there has been a lack of research regarding its application to the demolition stage of a building. For an effective waste management plan, the estimation of the type and volume of DW should begin from the building design stage. However, the lack of tools hinders an early estimation. This study proposes a BIM-based framework that estimates DW in the early design stages, to achieve an effective and streamlined planning, processing, and management. Specifically, the input of construction materials in the Korean construction classification system and those in the BIM library were matched. Based on this matching integration, the estimates of DW by type were calculated by applying the weight/unit volume factors and the rates of DW volume change. To verify the framework, its operation was demonstrated by means of an actual BIM modeling and by comparing its results with those available in the literature. This study is expected to contribute not only to the estimation of DW at the building level, but also to the automated estimation of DW at the district level.

  17. Measuring Evapotranspiration of five Alley Cropping systems in Germany using the Eddy-Covariance- and Bowen-Ratio Energy-Balance methods

    NASA Astrophysics Data System (ADS)

    Markwitz, Christian; Knohl, Alexander; Siebicke, Lukas

    2017-04-01

    The inclusion of trees into the agricultural landscape of Europe is gaining popularity as a source for energy production. Fast growing tree species such as poplar or willow are included as short rotation coppice or alley cropping systems, which consist of tree alleys interleaved by annual rotating crops or perennial grasslands. Estimating turbulent fluxes of those systems using the eddy-covariance- (ECEB) and bowen-ratio energy-balance (BREB) method is challenging due to the methods limitation to horizontally homogeneous terrain and steady state conditions. As the conditions are not fulfilled for those systems the energy-balance is commonly not fully closed, with the non-closure being site specific. An underestimation of measured heat fluxes leads to an overestimation of the latent heat fluxes inferred from the ECEB method. The aim of our study is to 1) quantify the site specific non-closure of the energy-balance and 2) characterize the performance of both methods, compared to direct eddy-covariance measurements using a high frequency infra-red gas analyzer (LI-7200, Licor Inc.). To assess continuous evapotranspiration (ET) rates on a 30-minute time scale we installed a combined ECEB and BREB system at five alley cropping and five agricultural reference sites across Germany. For time periods of four weeks we performed direct eddy covariance flux measurements for H2O and CO2 over one crop- and one grassland alley cropping- and their respective reference systems during the growing season of 2016. We found a non-closure between 21 and 26 % for all sites, considering all day- and night-time data. The residual energy was highest during the morning and lowest in the afternoon. Related to that the energy-balance ratio (EBR), i.e. the ratio between the turbulent heat fluxes and available energy, was below one in the morning hours and increased slightly during the day up to 1.8, until the EBR decreased sharply after sunset. The EBR correlated to the daily cycle of solar radiation, the main driver of turbulent fluxes. Corresponding, we found an increasing EBR with increasing friction velocity, indicating, that under turbulent condition the energy-balance closure improves. Further, we found that the turbulent fluxes estimated by the BREB method compared well with direct eddy-covariance measurements and that the accuracy improved with increasing sensor distance. We conclude, when calculating ET rates on a 30-minute time scale using the ECEB method the site specific non-closure should be assessed beforehand by eddy-covariance. In the current study, ignoring the non-closure would have lead to an overestimation of the latent heat flux of about 25 % for the ECEB method. For a longer averaging period of one day the overestimation was reduced to less than 5 %.

  18. Closure Report for Corrective Action Unit 574: Neptune, Nevada National Security Site, Nevada

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NSTec Environmental Restoration

    Corrective Action Unit (CAU) 574 is identified in the Federal Facility Agreement and Consent Order (FFACO) as 'Neptune' and consists of the following two Corrective Action Sites (CASs), located in Area 12 of the Nevada National Security Site: (1) CAS 12-23-10, U12c.03 Crater (Neptune); and (2) CAS 12-45-01, U12e.05 Crater (Blanca). This Closure Report presents information supporting closure of CAU 574 according to the FFACO (FFACO, 1996 [as amended March 2010]) and the Streamlined Approach for Environmental Restoration Plan for CAU 574 (U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office [NNSA/NSO], 2011). The following activities were performedmore » to support closure of CAU 574: (1) In situ external dose rate measurements were collected using thermoluminescent dosimeters at CAS 12-45-01, U12e.05 Crater (Blanca). (2) Total effective dose rates were determined at both sites by summing the internal and external dose rate components. (3) A use restriction (UR) was implemented at CAS 12-23-10, U12c.03 Crater (Neptune). Areas that exceed the final action level (FAL) of 25 millirems per year (mrem/yr) based on the Occasional Use Area exposure scenario are within the existing use restricted area for CAU 551. The 25-mrem/yr FAL is not exceeded outside the existing CAU 551 UR for any of the exposure scenarios (Industrial Area, Remote Work Area, and Occasional Use Area). Therefore, the existing UR for CAU 551 is sufficient to bound contamination that exceeds the FAL. (4) An administrative UR was implemented at CAS 12-45-01, U12e.05 Crater (Blanca) as a best management practice (BMP). The 25-mrem/yr FAL was not exceeded for the Remote Work Area or Occasional Use Area exposure scenarios; therefore, a UR is not required. However, because the 25-mrem/yr FAL was exceeded for the Industrial Area exposure scenario, an administrative UR was established as a BMP. UR documentation is included as Appendix B. The UR at CAS 12-23-10, U12c.03 Crater (Neptune), is within the existing UR for CAU 551. Additional postings were not installed, and annual post-closure inspections will be performed in conjunction with the inspections performed for CAU 551. At CAS 12-45-01, U12e.05 Crater (Blanca), the administrative UR does not require postings or inspections. NNSA/NSO requests the following: (1) A Notice of Completion from the Nevada Division of Environmental Protection to NNSA/NSO for closure of CAU 574; and (2) The transfer of CAU 574 from Appendix III to Appendix IV, Closed Corrective Action Units, of the FFACO« less

  19. Use of percutaneous closure devices in the removal of central venous catheters from inadvertent arterial catheterizations.

    PubMed

    Guimaraes, M; Uflacker, R; Schonholz, C; Hannegan, C; Selby, B

    2008-06-01

    Although rare, misplacement of central venous catheters in supra-aortic arteries is potentially fatal. Five patients had safe catheters removal using percutaneous closure devices. Three patients were coagulopathic, 3 under intensive care and 1 in immediate postoperative limb amputation. Patients were treated successfully, with immediate hemostasis and without complications in a mean follow-up of 12.5 months. Although the number of patients is small, the closure devices proved to be safe. This is a minimally invasive alternative technique in the management of large bore catheters removed from non-compressible puncture sites such as subclavian and brachiocephalic arteries.

  20. Comment on "Relict Basin Closure and Crustal Shortening Budgets During Continental Collision: An Example From Caucasus Sediment Provenance" by Cowgill et al. (2016)

    NASA Astrophysics Data System (ADS)

    Vincent, Stephen J.; Saintot, Aline; Mosar, Jon; Okay, Aral I.; Nikishin, Anatoly M.

    2018-03-01

    The southern slope of the Greater Caucasus mountains is the site of a former rift basin. In order to explain shortening deficits, plate deceleration, and the 5 Ma reorganization of the Arabia-Eurasia collision zone Cowgill et al. (2016) proposed that this basin closed 5 Myrs ago. Within the western Greater Caucasus, at least, careful examination of sedimentological, provenance, and seismic data, however, supports an earlier 35 Ma basin closure age. Basin closure cannot therefore be the driving mechanism for the 5 Ma deceleration of the Arabian plate and reorganization of the Arabia-Eurasia collision zone.

Top