Reliability demonstration test for load-sharing systems with exponential and Weibull components
Hu, Qingpei; Yu, Dan; Xie, Min
2017-01-01
Conducting a Reliability Demonstration Test (RDT) is a crucial step in production. Products are tested under certain schemes to demonstrate whether their reliability indices reach pre-specified thresholds. Test schemes for RDT have been studied in different situations, e.g., lifetime testing, degradation testing and accelerated testing. Systems designed with several structures are also investigated in many RDT plans. Despite the availability of a range of test plans for different systems, RDT planning for load-sharing systems hasn’t yet received the attention it deserves. In this paper, we propose a demonstration method for two specific types of load-sharing systems with components subject to two distributions: exponential and Weibull. Based on the assumptions and interpretations made in several previous works on such load-sharing systems, we set the mean time to failure (MTTF) of the total system as the demonstration target. We represent the MTTF as a summation of mean time between successive component failures. Next, we introduce generalized test statistics for both the underlying distributions. Finally, RDT plans for the two types of systems are established on the basis of these test statistics. PMID:29284030
Reliability demonstration test for load-sharing systems with exponential and Weibull components.
Xu, Jianyu; Hu, Qingpei; Yu, Dan; Xie, Min
2017-01-01
Conducting a Reliability Demonstration Test (RDT) is a crucial step in production. Products are tested under certain schemes to demonstrate whether their reliability indices reach pre-specified thresholds. Test schemes for RDT have been studied in different situations, e.g., lifetime testing, degradation testing and accelerated testing. Systems designed with several structures are also investigated in many RDT plans. Despite the availability of a range of test plans for different systems, RDT planning for load-sharing systems hasn't yet received the attention it deserves. In this paper, we propose a demonstration method for two specific types of load-sharing systems with components subject to two distributions: exponential and Weibull. Based on the assumptions and interpretations made in several previous works on such load-sharing systems, we set the mean time to failure (MTTF) of the total system as the demonstration target. We represent the MTTF as a summation of mean time between successive component failures. Next, we introduce generalized test statistics for both the underlying distributions. Finally, RDT plans for the two types of systems are established on the basis of these test statistics.
Crawler Acquisition and Testing Demonstration Project Management Plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
DEFIGH-PRICE, C.
2000-10-23
If the crawler based retrieval system is selected, this project management plan identifies the path forward for acquiring a crawler/track pump waste retrieval system, and completing sufficient testing to support deploying the crawler for as part of a retrieval technology demonstration for Tank 241-C-104. In the balance of the document, these activities will be referred to as the Crawler Acquisition and Testing Demonstration. During recent Tri-Party Agreement negotiations, TPA milestones were proposed for a sludge/hard heel waste retrieval demonstration in tank C-104. Specifically one of the proposed milestones requires completion of a cold demonstration of sufficient scale to support finalmore » design and testing of the equipment (M-45-03G) by 6/30/2004. A crawler-based retrieval system was one of the two options evaluated during the pre-conceptual engineering for C-104 retrieval (RPP-6843 Rev. 0). The alternative technology procurement initiated by the Hanford Tanks Initiative (HTI) project, combined with the pre-conceptual engineering for C-104 retrieval provide an opportunity to achieve compliance with the proposed TPA milestone M-45-03H. This Crawler Acquisition and Testing Demonstration project management plan identifies the plans, organizational interfaces and responsibilities, management control systems, reporting systems, timeline and requirements for the acquisition and testing of the crawler based retrieval system. This project management plan is complimentary to and supportive of the Project Management Plan for Retrieval of C-104 (RPP-6557). This project management plan focuses on utilizing and completing the efforts initiated under the Hanford Tanks Initiative (HTI) to acquire and cold test a commercial crawler based retrieval system. The crawler-based retrieval system will be purchased on a schedule to support design of the waste retrieval from tank C-104 (project W-523) and to meet the requirement of proposed TPA milestone M-45-03H. This Crawler Acquisition and Testing Demonstration project management plan includes the following: (1) Identification of acquisition strategy and plan to obtain a crawler based retrieval system; (2) Plan for sufficient cold testing to make a decision for W-523 and to comply with TPA Milestone M-45-03H; (3) Cost and schedule for path forward; (4) Responsibilities of the participants; and (5) The plan is supported by updated Level 1 logics, a Relative Order of Magnitude cost estimate and preliminary project schedule.« less
Transit bus stop pedestrian warning application : acceptance test plan : final report.
DOT National Transportation Integrated Search
2016-10-14
This document is the Acceptance Test Plan for the Transit Bus Stop Pedestrian Warning (TSPW) application. This report describes the test and demonstration plan to verify that the application meets its functional and performance requirements.
DOT National Transportation Integrated Search
2012-08-01
This report presents the test plan for conducting the Corridor Performance Analysis for the United States Department of Transportation (U.S. DOT) evaluation of the Dallas U.S. 75 Integrated Corridor Management (ICM) Initiative Demonstration. The ICM ...
DOT National Transportation Integrated Search
2012-08-01
This report presents the test plan for conducting the Corridor Performance Analysis for the United States Department of Transportation (U.S. DOT) evaluation of the San Diego Integrated Corridor Management (ICM) Initiative Demonstration. The ICM proje...
DOT National Transportation Integrated Search
2012-08-01
This report presents the test plan for conducting the Decision Support System (DSS) Analysis for the United States Department of Transportation (U.S. DOT) evaluation of the Dallas U.S. 75 Integrated Corridor Management (ICM) Initiative Demonstration....
DOT National Transportation Integrated Search
2012-08-01
This report presents the test plan for conducting the Technical Capability Analysis for the United States Department of Transportation (U.S. DOT) evaluation of the Dallas U.S. 75 Integrated Corridor Management (ICM) Initiative Demonstration. The ICM ...
DOT National Transportation Integrated Search
2012-08-01
This report presents the test plan for conducting the Benefit-Cost Analysis (BCA) for the United States Department of Transportation (U.S. DOT) evaluation of the San Diego Integrated Corridor Management (ICM) Initiative Demonstration. The ICM project...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-08-07
...; surveys, research and evaluation methodologies; demonstration testing and model development; synthesis and..., policy and program analysis; surveys, research and evaluation methodologies; demonstration testing and... Organization, Functions, and Delegations of Authority; Office of Planning, Research and Evaluation AGENCY...
Freight Advanced Traveler Information System (FRATIS) : Dallas-Fort Worth demonstration plan.
DOT National Transportation Integrated Search
2013-06-01
This document describes the Demonstration Plan for the FRATIS system. The demonstration component of this task will serve to test the technical feasibility of the FRATIS prototype while also facilitating the collection of baseline and performance dat...
Step 1: Human System Integration Simulation and Flight Test Progress Report
NASA Technical Reports Server (NTRS)
2005-01-01
The Access 5 Human Systems Integration Work Package produced simulation and flight demonstration planning products for use throughout the program. These included: Test Objectives for Command, Control, Communications; Pilot Questionnaire for Command, Control, Communications; Air Traffic Controller Questionnaire for Command, Control, Communications; Test Objectives for Collision Avoidance; Pilot Questionnaire for Collision Avoidance; Plans for Unmanned Aircraft Systems Control Station Simulations Flight Requirements for the Airspace Operations Demonstration
In situ gas treatment technology demonstration test plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
Thornton, E.C.; Miller, R.D.
1996-02-16
This document defines the objectives and requirements associated with undertaking a field demonstration of an in situ gas treatment appoach to remediation chromate-contaminated soil. The major tasks presented in this plan include the design and development of the surface gas treatment system, performance of permitting activities, and completion of site preparation and field testing activities.
Servicers system demonstration plan and capability development
NASA Technical Reports Server (NTRS)
Bulboaca, M. A.; Cuseo, J. A.; Derocher, W. L., Jr.; Maples, R. W.; Reynolds, P. C.; Sterrett, R. A.
1985-01-01
A plan for the demonstration of the exchange of Multi-Mission Modular Spacecraft (MMS) modules using the servicer mechanism Engineering Test Unit (ETU) was prepared and executed. The plan included: establishment of requirements, conceptual design, selection of MMS spacecraft mockup configuration, selection of MMS module mockup configuration, evaluation of adequacy of ETU load capability, and selection of a stowage rack arrangement. The MMS module exchange demonstration mockup equipment was designed, fabricated, checked out, shipped, installed, and demonstrated.
This Test and Quality Assurance Plan (TQAP) provides data quality objections for the success factors that were validated during this demonstration include energy production, emissions and emission reductions compared to alternative systems, economics, and operability, including r...
NASA Astrophysics Data System (ADS)
Strunz, Richard; Herrmann, Jeffrey W.
2011-12-01
The hot fire test strategy for liquid rocket engines has always been a concern of space industry and agency alike because no recognized standard exists. Previous hot fire test plans focused on the verification of performance requirements but did not explicitly include reliability as a dimensioning variable. The stakeholders are, however, concerned about a hot fire test strategy that balances reliability, schedule, and affordability. A multiple criteria test planning model is presented that provides a framework to optimize the hot fire test strategy with respect to stakeholder concerns. The Staged Combustion Rocket Engine Demonstrator, a program of the European Space Agency, is used as example to provide the quantitative answer to the claim that a reduced thrust scale demonstrator is cost beneficial for a subsequent flight engine development. Scalability aspects of major subsystems are considered in the prior information definition inside the Bayesian framework. The model is also applied to assess the impact of an increase of the demonstrated reliability level on schedule and affordability.
South Florida freight advanced traveler information system.
DOT National Transportation Integrated Search
2013-10-01
This Demonstration Plan has been prepared to provide guidance and a common definition to all parties of the testing program that will be conducted for the South Florida FRATIS Demonstration Project. More specifically, this document provides: Plan...
Field Test of Route Planning Software for Lunar Polar Missions
NASA Astrophysics Data System (ADS)
Horchler, A. D.; Cunningham, C.; Jones, H. L.; Arnett, D.; Fang, E.; Amoroso, E.; Otten, N.; Kitchell, F.; Holst, I.; Rock, G.; Whittaker, W.
2017-10-01
A novel field test paradigm has been developed to demonstrate and validate route planning software in the stark low-angled light and sweeping shadows a rover would experience at the poles of the Moon. Software, ConOps, and test results are presented.
49 CFR 232.505 - Pre-revenue service acceptance testing plan.
Code of Federal Regulations, 2013 CFR
2013-10-01
... acceptance tests; (3) Correct any safety deficiencies identified by FRA in the design of the equipment or in... principal test objectives shall be to demonstrate that the equipment meets the safety design and performance... 49 Transportation 4 2013-10-01 2013-10-01 false Pre-revenue service acceptance testing plan. 232...
49 CFR 232.505 - Pre-revenue service acceptance testing plan.
Code of Federal Regulations, 2012 CFR
2012-10-01
... acceptance tests; (3) Correct any safety deficiencies identified by FRA in the design of the equipment or in... principal test objectives shall be to demonstrate that the equipment meets the safety design and performance... 49 Transportation 4 2012-10-01 2012-10-01 false Pre-revenue service acceptance testing plan. 232...
49 CFR 232.505 - Pre-revenue service acceptance testing plan.
Code of Federal Regulations, 2014 CFR
2014-10-01
... acceptance tests; (3) Correct any safety deficiencies identified by FRA in the design of the equipment or in... principal test objectives shall be to demonstrate that the equipment meets the safety design and performance... 49 Transportation 4 2014-10-01 2014-10-01 false Pre-revenue service acceptance testing plan. 232...
49 CFR 232.505 - Pre-revenue service acceptance testing plan.
Code of Federal Regulations, 2011 CFR
2011-10-01
... acceptance tests; (3) Correct any safety deficiencies identified by FRA in the design of the equipment or in... principal test objectives shall be to demonstrate that the equipment meets the safety design and performance... 49 Transportation 4 2011-10-01 2011-10-01 false Pre-revenue service acceptance testing plan. 232...
DOT National Transportation Integrated Search
1995-10-01
REAL-TIME TRAFFIC INFORMATION, ROUTE GUIDANCE, ROUTE PLANNING, INTELLIGENT VEHICLE INITIATIVE OR IVI ">">KEYWORDS: OPERATIONAL TESTS, TRAVTEK, ADVANCED TRAVELER INFORMATION SYSTEMS OR ATIS, ADVANCED TRAFFIC MANAGEMENT SYSTEMS OR ATMS, INTELLI...
Multiple objective optimization in reliability demonstration test
Lu, Lu; Anderson-Cook, Christine Michaela; Li, Mingyang
2016-10-01
Reliability demonstration tests are usually performed in product design or validation processes to demonstrate whether a product meets specified requirements on reliability. For binomial demonstration tests, the zero-failure test has been most commonly used due to its simplicity and use of minimum sample size to achieve an acceptable consumer’s risk level. However, this test can often result in unacceptably high risk for producers as well as a low probability of passing the test even when the product has good reliability. This paper explicitly explores the interrelationship between multiple objectives that are commonly of interest when planning a demonstration test andmore » proposes structured decision-making procedures using a Pareto front approach for selecting an optimal test plan based on simultaneously balancing multiple criteria. Different strategies are suggested for scenarios with different user priorities and graphical tools are developed to help quantify the trade-offs between choices and to facilitate informed decision making. As a result, potential impacts of some subjective user inputs on the final decision are studied to offer insights and useful guidance for general applications.« less
Secondary Waste Cast Stone Waste Form Qualification Testing Plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
Westsik, Joseph H.; Serne, R. Jeffrey
2012-09-26
The Hanford Tank Waste Treatment and Immobilization Plant (WTP) is being constructed to treat the 56 million gallons of radioactive waste stored in 177 underground tanks at the Hanford Site. The WTP includes a pretreatment facility to separate the wastes into high-level waste (HLW) and low-activity waste (LAW) fractions for vitrification and disposal. The LAW will be converted to glass for final disposal at the Integrated Disposal Facility (IDF). Cast Stone – a cementitious waste form, has been selected for solidification of this secondary waste stream after treatment in the ETF. The secondary-waste Cast Stone waste form must be acceptablemore » for disposal in the IDF. This secondary waste Cast Stone waste form qualification testing plan outlines the testing of the waste form and immobilization process to demonstrate that the Cast Stone waste form can comply with the disposal requirements. Specifications for the secondary-waste Cast Stone waste form have not been established. For this testing plan, Cast Stone specifications are derived from specifications for the immobilized LAW glass in the WTP contract, the waste acceptance criteria for the IDF, and the waste acceptance criteria in the IDF Permit issued by the State of Washington. This testing plan outlines the testing needed to demonstrate that the waste form can comply with these waste form specifications and acceptance criteria. The testing program must also demonstrate that the immobilization process can be controlled to consistently provide an acceptable waste form product. This testing plan also outlines the testing needed to provide the technical basis for understanding the long-term performance of the waste form in the disposal environment. These waste form performance data are needed to support performance assessment analyses of the long-term environmental impact of the secondary-waste Cast Stone waste form in the IDF« less
Spacecraft servicing demonstration plan
NASA Technical Reports Server (NTRS)
Bergonz, F. H.; Bulboaca, M. A.; Derocher, W. L., Jr.
1984-01-01
A preliminary spacecraft servicing demonstration plan is prepared which leads to a fully verified operational on-orbit servicing system based on the module exchange, refueling, and resupply technologies. The resulting system can be applied at the space station, in low Earth orbit with an orbital maneuvering vehicle (OMV), or be carried with an OMV to geosynchronous orbit by an orbital transfer vehicle. The three phase plan includes ground demonstrations, cargo bay demonstrations, and free flight verifications. The plan emphasizes the exchange of multimission modular spacecraft (MMS) modules which involves space repairable satellites. Three servicer mechanism configurations are the engineering test unit, a protoflight quality unit, and two fully operational units that have been qualified and documented for use in free flight verification activity. The plan balances costs and risks by overlapping study phases, utilizing existing equipment for ground demonstrations, maximizing use of existing MMS equipment, and rental of a spacecraft bus.
NASA Technical Reports Server (NTRS)
Davis, Randal; Thalman, Nancy
1993-01-01
The University of Colorado's Laboratory for Atmospheric and Space Physics (CU/LASP) along with the Goddard Space Flight Center (GSFC) and the Jet Propulsion Laboratory (JPL) designed, implemented, tested, and demonstrated a prototype of the distributed, hierarchical planning and scheduling system comtemplated for the Earth Observing System (EOS) project. The planning and scheduling prototype made use of existing systems: CU/LASP's Operations and Science Instrument Support Planning and Scheduling (OASIS-PS) software package; GSFC's Request Oriented Scheduling Engine (ROSE); and JPL's Plan Integrated Timeliner 2 (Plan-It-2). Using these tools, four scheduling nodes were implemented and tied together using a new communications protocol for scheduling applications called the Scheduling Applications Interface Language (SAIL). An extensive and realistic scenario of EOS satellite operations was then developed and the prototype scheduling system was tested and demonstrated using the scenario. Two demonstrations of the system were given to NASA personnel and EOS core system (ECS) contractor personnel. A comprehensive volume of lessons learned was generated and a meeting was held with NASA and ECS representatives to review these lessons learned. A paper and presentation on the project's final results was given at the American Institute of Aeronautics and Astronautics Computing in Aerospace 9 conference.
NASA Technical Reports Server (NTRS)
1976-01-01
The framework within which the Applications Systems Verification Tests (ASVTs) are performed and the economic consequences of improved meteorological information demonstrated is described. This framework considers the impact of improved information on decision processes, the data needs to demonstrate the economic impact of the improved information, the data availability, the methodology for determining and analyzing the collected data and demonstrating the economic impact of the improved information, and the possible methods of data collection. Three ASVTs are considered and program outlines and plans are developed for performing experiments to demonstrate the economic consequences of improved meteorological information. The ASVTs are concerned with the citrus crop in Florida, the cotton crop in Mississippi and a group of diverse crops in Oregon. The program outlines and plans include schedules, manpower estimates and funding requirements.
Structural assembly demonstration experiment, phase 1
NASA Astrophysics Data System (ADS)
Akin, David L.; Bowden, Mary L.; Miller, Rene H.
1983-03-01
The goal of this phase of the structural assembly and demonstration experiment (SADE) program was to begin to define a shuttle flight experiment that would yield data to compare on-orbit assembly operations of large space structures with neutral buoyancy simulations. In addition, the experiment would be an early demonstration of structural hardware and human capabilities in extravehicular activity (EVA). The objectives of the MIT study, as listed in the statement of work, were: to provide support in establishing a baseline neutral buoyancy testing data base, to develop a correlation technique between neutral buoyancy test results and on-orbit operations, and to prepare the SADE experiment plan (MSFC-PLAN-913).
DOT National Transportation Integrated Search
1997-09-01
Integration of intelligent transportation systems (ITS) within a metropolitan area is crucial for effective deployment. The Early Deployment Planning (EDP) Process is one tool that allows transportation officials to plan for and implement ITS technol...
Computer-Assisted School Facility Planning with ONPASS.
ERIC Educational Resources Information Center
Urban Decision Systems, Inc., Los Angeles, CA.
The analytical capabilities of ONPASS, an on-line computer-aided school facility planning system, are described by its developers. This report describes how, using the Canoga Park-Winnetka-Woodland Hills Planning Area as a test case, the Department of City Planning of the city of Los Angeles employed ONPASS to demonstrate how an on-line system can…
General test plan redundant sensor strapdown IMU evaluation program
NASA Technical Reports Server (NTRS)
Hartwell, T.; Irwin, H. A.; Miyatake, Y.; Wedekind, D. E.
1971-01-01
The general test plan for a redundant sensor strapdown inertial measuring unit evaluation program is presented. The inertial unit contains six gyros and three orthogonal accelerometers. The software incorporates failure detection and correction logic and a land vehicle navigation program. The principal objective of the test is a demonstration of the practicability, reliability, and performance of the inertial measuring unit with failure detection and correction in operational environments.
Optical Closed-Loop Propulsion Control System Development
NASA Technical Reports Server (NTRS)
Poppel, Gary L.
1998-01-01
The overall objective of this program was to design and fabricate the components required for optical closed-loop control of a F404-400 turbofan engine, by building on the experience of the NASA Fiber Optic Control System Integration (FOCSI) program. Evaluating the performance of fiber optic technology at the component and system levels will result in helping to validate its use on aircraft engines. This report includes descriptions of three test plans. The EOI Acceptance Test is designed to demonstrate satisfactory functionality of the EOI, primarily fail-safe throughput of the F404 sensor signals in the normal mode, and validation, switching, and output of the five analog sensor signals as generated from validated optical sensor inputs, in the optical mode. The EOI System Test is designed to demonstrate acceptable F404 ECU functionality as interfaced with the EOI, making use of a production ECU test stand. The Optical Control Engine Test Request describes planned hardware installation, optical signal calibrations, data system coordination, test procedures, and data signal comparisons for an engine test demonstration of the optical closed-loop control.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Haas, J.C.; Olivo, C.A.; Wilson, K.B.
1994-04-01
An experimental test plan has been prepared for DOE/METC review and approval to develop a filter media suitable for multi-contaminant control in granular-bed filter (GBF) applications. The plan includes identification, development, and demonstration of methods for enhanced media morphology, chemical reactivity, and mechanical strength. The test plan includes media preparation methods, physical and chemical characterization methods for fresh and reacted media, media evaluation criteria, details of test and analytical equipment, and test matrix of the proposed media testing. A filter media composed of agglomerated limestone and clay was determined to be the best candidate for multi-contaminate control in GBF operation.more » The combined limestone/clay agglomerate has the potential to remove sulfur and alkali species, in addition to particulate, and possibly halogens and trace heavy metals from coal process streams.« less
Top Down Implementation Plan for system performance test software
NASA Technical Reports Server (NTRS)
Jacobson, G. N.; Spinak, A.
1982-01-01
The top down implementation plan used for the development of system performance test software during the Mark IV-A era is described. The plan is based upon the identification of the hierarchical relationship of the individual elements of the software design, the development of a sequence of functionally oriented demonstrable steps, the allocation of subroutines to the specific step where they are first required, and objective status reporting. The results are: determination of milestones, improved managerial visibility, better project control, and a successful software development.
VCE testbed program planning and definition study
NASA Technical Reports Server (NTRS)
Westmoreland, J. S.; Godston, J.
1978-01-01
The flight definition of the Variable Stream Control Engine (VSCE) was updated to reflect design improvements in the two key components: (1) the low emissions duct burner, and (2) the coannular exhaust nozzle. The testbed design was defined and plans for the overall program were formulated. The effect of these improvements was evaluated for performance, emissions, noise, weight, and length. For experimental large scale testing of the duct burner and coannular nozzle, a design definition of the VCE testbed configuration was made. This included selecting the core engine, determining instrumentation requirements, and selecting the test facilities, in addition to defining control system and assembly requirements. Plans for a comprehensive test program to demonstrate the duct burner and nozzle technologies were formulated. The plans include both aeroacoustic and emissions testing.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Bruffey, Stephanie H.; Spencer, Barry B.; Jubin, Robert Thomas
2013-12-01
The objective of this test plan is to describe research that will determine the effectiveness of silver mordenite and molecular sieve beds to remove iodine and water (tritium) from off-gas streams arising from used nuclear fuel recycling processes, and to demonstrate that the iodine and water can be recovered separately from one another.
Favorite Demonstrations for College Science
ERIC Educational Resources Information Center
Shmaefsky, Brian
2004-01-01
Peer-reviewed, classroom-tested, and tailored specifically for introductory science courses, Favorite Demonstrations is a complement to every college instructor's lesson plans. The book is an all-in-one compilation of 36 popular classroom demonstrations published since 1993 in the "Favorite Demonstration" column of NSTA's Journal of College …
46 CFR 127.110 - Plans and specifications required for new construction.
Code of Federal Regulations, 2010 CFR
2010-10-01
... necessary to demonstrate compliance with subpart D of part 130 of this subchapter. (2) Automation-test... or more gross tons, the plans required by § 110.25 of this chapter must be submitted. (f) Automation...
ERIC Educational Resources Information Center
HEATHERS, GLEN
DURING THE FIVE YEAR PERIOD, 1958-63, A DEMONSTRATION TEST OF THE DUAL PROGRESS PLAN WAS CONDUCTED IN GRADES 3 THROUGH 6 OF THE NINE ELEMENTARY SCHOOLS AND IN GRADES 7 AND 8 OF THE JUNIOR HIGH SCHOOLS IN LONG BEACH AND OSSINING, NEW YORK. RELATED TRYOUTS OF THE PLAN WERE MADE IN 14 OTHER SCHOOL SYSTEMS ACROSS THE COUNTRY. THE PLAN INVOLVES…
Step 1: C3 Flight Demo Data Analysis Plan
NASA Technical Reports Server (NTRS)
2005-01-01
The Data Analysis Plan (DAP) describes the data analysis that the C3 Work Package (WP) will perform in support of the Access 5 Step 1 C3 flight demonstration objectives as well as the processes that will be used by the Flight IPT to gather and distribute the data collected to satisfy those objectives. In addition to C3 requirements, this document will encompass some Human Systems Interface (HSI) requirements in performing the C3 flight demonstrations. The C3 DAP will be used as the primary interface requirements document between the C3 Work Package and Flight Test organizations (Flight IPT and Non-Access 5 Flight Programs). In addition to providing data requirements for Access 5 flight test (piggyback technology demonstration flights, dedicated C3 technology demonstration flights, and Airspace Operations Demonstration flights), the C3 DAP will be used to request flight data from Non- Access 5 flight programs for C3 related data products
2007-08-14
Boeing Phantom Works' subscale Blended Wing Body technology demonstration aircraft began its initial flight tests from NASA's Dryden Flight Research Center at Edwards Air Force Base, Calif. in the summer of 2007. The 8.5 percent dynamically scaled unmanned aircraft, designated the X-48B by the Air Force, is designed to mimic the aerodynamic characteristics of a full-scale large cargo transport aircraft with the same blended wing body shape. The initial flight tests focused on evaluation of the X-48B's low-speed flight characteristics and handling qualities. About 25 flights were planned to gather data in these low-speed flight regimes. Based on the results of the initial flight test series, a second set of flight tests was planned to test the aircraft's low-noise and handling characteristics at transonic speeds.
Full power level development of the Space Shuttle main engine
NASA Technical Reports Server (NTRS)
Johnson, J. R.; Colbo, H. I.
1982-01-01
Development of the Space Shuttle main engine for nominal operation at full power level (109 percent rated power) is continuing in parallel with the successful flight testing of the Space Transportation System. Verification of changes made to the rated power level configuration currently being flown on the Orbiter Columbia is in progress and the certification testing of the full power level configuration has begun. The certification test plan includes the accumulation of 10,000 seconds on each of two engines by early 1983. Certification testing includes the simulation of nominal mission duty cycles as well as the two abort thrust profiles: abort to orbit and return to launch site. Several of the certification tests are conducted at 111 percent power to demonstrate additional safety margins. In addition to the flight test and development program results, future plans for life demonstration and engine uprating will be discussed.
ERIC Educational Resources Information Center
Hinrichs, Roy S., Comp.
Thirty-one lesson plans on electricity-electronics are presented in this guide designed for industrial arts instructors. Each lesson plan is organized into the following format: (1) lesson objective; (2) supplementary teaching items; (3) presentation; (4) demonstration; (5) laboratory or other activities; and (6) test items (oral, written, or…
Servicer system demonstration plan and capability development
NASA Technical Reports Server (NTRS)
1987-01-01
An orbital maneuvering vehicle (OMV) front end kit is defined which is capable of performing in-situ fluid resupply and modular maintenance of free flying spacecraft based on the integrated orbital servicing system (IOSS) concept. The compatibility of the IOSS to perform gas and fluid umbilical connect and disconnect functions utilizing connect systems currently available or in development is addressed. A series of tasks involving on-orbit servicing and the engineering test unit (ETU) of the on-orbit service were studied. The objective is the advancement of orbital servicing by expanding the Spacecraft Servicing Demonstration Plan (SSDP) to include detail demonstration planning using the Multimission Modular Spacecraft (MMS) and upgrading the ETU control.
Addressing EO-1 Spacecraft Pulsed Plasma Thruster EMI Concerns
NASA Technical Reports Server (NTRS)
Zakrzwski, C. M.; Davis, Mitch; Sarmiento, Charles; Bauer, Frank H. (Technical Monitor)
2001-01-01
The Pulsed Plasma Thruster (PPT) Experiment on the Earth Observing One (EO-1) spacecraft has been designed to demonstrate the capability of a new generation PPT to perform spacecraft attitude control. Results from PPT unit level radiated electromagnetic interference (EMI) tests led to concerns about potential interference problems with other spacecraft subsystems. Initial plans to address these concerns included firing the PPT at the spacecraft level both in atmosphere, with special ground support equipment. and in vacuum. During the spacecraft level tests, additional concerns where raised about potential harm to the Advanced Land Imager (ALI). The inadequacy of standard radiated emission test protocol to address pulsed electromagnetic discharges and the lack of resources required to perform compatibility tests between the PPT and an ALI test unit led to changes in the spacecraft level validation plan. An EMI shield box for the PPT was constructed and validated for spacecraft level ambient testing. Spacecraft level vacuum tests of the PPT were deleted. Implementation of the shield box allowed for successful spacecraft level testing of the PPT while eliminating any risk to the ALI. The ALI demonstration will precede the PPT demonstration to eliminate any possible risk of damage of ALI from PPT operation.
A Collaborative Web-Based Approach to Planning Research, Integration, and Testing Using a Wiki
NASA Technical Reports Server (NTRS)
Delaney, Michael M.; Koshimoto, Edwin T.; Noble, Deleena; Duggan, Christopher
2010-01-01
The National Aeronautics and Space Administration Integrated Vehicle Health Management program touches on many different research areas while striving to enable the automated detection, diagnosis, prognosis, and mitigation of adverse events at the aircraft and system level. At the system level, the research focus is on the evaluation of multidisciplinary integrated methods, tools, and technologies for achieving the program goal. The participating program members form a diverse group of government, industry, and academic researchers. The program team developed the Research and Test Integration Plan in order to track significant test and evaluation activities, which are important for understanding, demonstrating, and communicating the overall project state and project direction. The Plan is a living document, which allows the project team the flexibility to construct conceptual test scenarios and to track project resources. The Plan also incorporates several desirable feature requirements for Plan users and maintainers. A wiki has proven to be the most efficient and effective means of implementing the feature requirements for the Plan. The wiki has proven very valuable as a research project management tool, and there are plans to expand its scope.
Engineering Task Plan for the Ultrasonic Inspection of Hanford Double Shell Tanks (DST) FY2000
DOE Office of Scientific and Technical Information (OSTI.GOV)
JENSEN, C.E.
2000-01-10
This document facilitates the ultrasonic examination of Hanford double-shell tanks. Included are a plan for engineering activities (individual responsibilities), plan for performance demonstration testing, and a plan for field activities (tank inspection). Also included are a Statement of Work for contractor performance of the work and a protocol to be followed should tank flaws that exceed the acceptance criteria be discovered.
DOT National Transportation Integrated Search
2013-06-01
This Demonstration Plan has been prepared to provide guidance and a common definition to all parties of the testing program that will be conducted for the LA-Gateway FRATIS Demonstration Project. More specifically, this document provides: Plannin...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Rance, J.
1979-03-20
This Test and Demonstration Report presents the Test Plan and the results of the tests performed on SLEEP Inverter, Gulton Model EMIR302. The objective of the overall program is to design, develop, fabricate and test the 120V, 60 to 400Hz, 3.75KVA SLEEP Inverter in accordance with the requirements of U. S. Army Mobility Equipment Research and Development Command Specification EED 76 022501.
SU-F-T-392: Superior Brainstem and Cochlea Sparing with VMAT for Glioblastoma Multiforme
DOE Office of Scientific and Technical Information (OSTI.GOV)
Briere, TM; McAleer, MF; Levy, LB
Purpose: Volumetric arc therapy (VMAT) can provide similar target coverage and normal tissue sparing as IMRT but with shorter treatment times. At our institution VMAT was adopted for the treatment glioblastoma multiforme (GBM) after a small number of test plans demonstrated its non-inferiority. In this study, we compare actual clinical treatment plans for a larger cohort of patients treated with either VMAT or IMRT. Methods: 90 GBM patients were included in this study, 45 treated with IMRT and 45 with VMAT. All planning target volumes (PTVs) were prescribed a dose of 50 Gy, with a simultaneous integrated boost to 60more » Gy. Most IMRT plans used 5 non-coplanar beams, while most VMAT plans used 2 coplanar beams. Statistical analysis was performed using Fisher’s exact test or the Wilcoxon-Mann-Whitney rank sum test. Included in the analysis were patient and treatment characteristics as well as the doses to the target volumes and organs at risk. Results: Treatment times for the VMAT plans were reduced by 5 minutes compared with IMRT. The PTV coverage was similar, with at least 95% covered for all plans, while the median boost PTV dose differed by 0.1 Gy between the IMRT and VMAT cohorts. The doses to the brain, optic chiasm, optic nerves and eyes were not significantly different. The mean dose to the brainstem, however, was 9.4 Gy less with VMAT (p<0.001). The dose to the ipsilateral and contralateral cochleae were respectively 19.7 and 9.5 Gy less (p<0.001). Conclusion: Comparison of clinical treatment plans for separate IMRT and VMAT cohorts demonstrates that VMAT can save substantial treatment time while providing similar target coverage and superior sparing of the brainstem and cochleae. To our knowledge this is the first study to demonstrate this benefit of VMAT in the management of GBM.« less
Improved Test Planning and Analysis Through the Use of Advanced Statistical Methods
NASA Technical Reports Server (NTRS)
Green, Lawrence L.; Maxwell, Katherine A.; Glass, David E.; Vaughn, Wallace L.; Barger, Weston; Cook, Mylan
2016-01-01
The goal of this work is, through computational simulations, to provide statistically-based evidence to convince the testing community that a distributed testing approach is superior to a clustered testing approach for most situations. For clustered testing, numerous, repeated test points are acquired at a limited number of test conditions. For distributed testing, only one or a few test points are requested at many different conditions. The statistical techniques of Analysis of Variance (ANOVA), Design of Experiments (DOE) and Response Surface Methods (RSM) are applied to enable distributed test planning, data analysis and test augmentation. The D-Optimal class of DOE is used to plan an optimally efficient single- and multi-factor test. The resulting simulated test data are analyzed via ANOVA and a parametric model is constructed using RSM. Finally, ANOVA can be used to plan a second round of testing to augment the existing data set with new data points. The use of these techniques is demonstrated through several illustrative examples. To date, many thousands of comparisons have been performed and the results strongly support the conclusion that the distributed testing approach outperforms the clustered testing approach.
Project W-314 specific test and evaluation plan for transfer line SN-633 (241-AX-B to 241-AY-02A)
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hays, W.H.
1998-03-20
The purpose of this Specific Test and Evaluation Plan (STEP) is to provide a detailed written plan for the systematic testing of modifications made by the addition of the SN-633 transfer line by the W-314 Project. The STEP develops the outline for test procedures that verify the system`s performance to the established Project design criteria. The STEP is a lower tier document based on the W-314 Test and Evaluation Plan (TEP). This STEP encompasses all testing activities required to demonstrate compliance to the project design criteria as it relates to the addition of transfer line SN-633. The Project Design Specificationsmore » (PDS) identify the specific testing activities required for the Project. Testing includes Validations and Verifications (e.g., Commercial Grade Item Dedication activities), Factory Acceptance Tests (FATs), installation tests and inspections, Construction Acceptance Tests (CATs), Acceptance Test Procedures (ATPs), Pre-Operational Test Procedures (POTPs), and Operational Test Procedures (OTPs). It should be noted that POTPs are not required for testing of the transfer line addition. The STEP will be utilized in conjunction with the TEP for verification and validation.« less
Space Technology 5: Changing the Mission Design without Changing the Hardware
NASA Technical Reports Server (NTRS)
Carlisle, Candace C.; Webb, Evan H.; Slavin, James A.
2005-01-01
The Space Technology 5 (ST-5) Project is part of NASA's New Millennium Program. The validation objectives are to demonstrate the research-quality science capability of the ST-5 spacecraft; to operate the three spacecraft as a constellation; and to design, develop, test and flight-validate three capable micro-satellites with new technologies. A three-month flight demonstration phase is planned, beginning in March 2006. This year, the mission was re-planned for a Pegasus XL dedicated launch into an elliptical polar orbit (instead of the Originally-planned Geosynchronous Transfer Orbit.) The re-plan allows the mission to achieve the same high-level technology validation objectives with a different launch vehicle. The new mission design involves a revised science validation strategy, a new orbit and different communication strategy, while minimizing changes to the ST-5 spacecraft itself. The constellation operations concepts have also been refined. While the system engineers, orbit analysts, and operations teams were re-planning the mission, the implementation team continued to make progress on the flight hardware. Most components have been delivered, and the first spacecraft is well into integration and test.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lombard, K.H.
1994-08-01
The objectives of this test plan are to show the value added by using bioremediation as an effective and environmentally sound method to remediate petroleum contaminated soils (PCS) by: demonstrating bioremediation as a permanent method for remediating soils contaminated with petroleum products; establishing the best operating conditions for maximizing bioremediation and minimizing volatilization for SRS PCS during different seasons; determining the minimum set of analyses and sampling frequency to allow efficient and cost-effective operation; determining best use of existing site equipment and personnel to optimize facility operations and conserve SRS resources; and as an ancillary objective, demonstrating and optimizing newmore » and innovative analytical techniques that will lower cost, decrease time, and decrease secondary waste streams for required PCS assays.« less
30 CFR 282.15 - Cancellation of leases.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 30 Mineral Resources 2 2011-07-01 2011-07-01 false Cancellation of leases. 282.15 Section 282.15 Mineral Resources BUREAU OF OCEAN ENERGY MANAGEMENT, REGULATION, AND ENFORCEMENT, DEPARTMENT OF THE...; (B) A Testing Plan or Mining Plan is disapproved because the lessee's failure to demonstrate...
30 CFR 281.47 - Cancellation of leases.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 30 Mineral Resources 2 2011-07-01 2011-07-01 false Cancellation of leases. 281.47 Section 281.47 Mineral Resources BUREAU OF OCEAN ENERGY MANAGEMENT, REGULATION, AND ENFORCEMENT, DEPARTMENT OF THE... Testing Plan or Mining Plan is disapproved because of the lessee's failure to demonstrate compliance with...
System acceptance test plan : Dallas Integrated Corridor Management (ICM) demonstration project.
DOT National Transportation Integrated Search
2013-02-01
The Dallas Area Rapid Transit (DART) is leading the US 75 Integrated Corridor Management (ICM) Demonstration Project for the Dallas region. Coordinated corridor operations and management is predicated on being able to share transportation information...
1993-04-01
separation capability. o Demonstrate advanced KKVs in the 6-20 KG weight class. o Test planning for SRAM/LEAP and PATRIOT/LEAP integrated technology...packaging techniques to reduce satellite size, weight , power, and total system costs. Further development of these technologies are absolutely 4...1993 o Developed a master plan with a delivery schedule for each light- weight subassembly in the sensor integration payload. o Finalized a contract for
Halogen occultation experiment intergrated test plan
NASA Technical Reports Server (NTRS)
Mauldin, L. E., III; Butterfield, A. J.
1986-01-01
The test program plan is presented for the Halogen Occultation Experiment (HALOE) instrument, which is being developed in-house at the Langley Research Center for the Upper Atmosphere Research Satellite (UARS). This comprehensive test program was developed to demonstrate that the HALOE instrument meets its performance requirements and maintains integrity through UARS flight environments. Each component, subsystem, and system level test is described in sufficient detail to allow development of the necessary test setups and test procedures. Additionally, the management system for implementing this test program is given. The HALOE instrument is a gas correlation radiometer that measures vertical distribution of eight upper atmospheric constituents: O3, HC1, HF, NO, CH4, H2O, NO2, and CO2.
30 CFR 582.15 - Cancellation of leases.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 30 Mineral Resources 2 2014-07-01 2014-07-01 false Cancellation of leases. 582.15 Section 582.15 Mineral Resources BUREAU OF OCEAN ENERGY MANAGEMENT, DEPARTMENT OF THE INTERIOR OFFSHORE OPERATIONS IN THE... Testing Plan or Mining Plan is disapproved because the lessee's failure to demonstrate compliance with the...
30 CFR 582.15 - Cancellation of leases.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 30 Mineral Resources 2 2012-07-01 2012-07-01 false Cancellation of leases. 582.15 Section 582.15 Mineral Resources BUREAU OF OCEAN ENERGY MANAGEMENT, DEPARTMENT OF THE INTERIOR OFFSHORE OPERATIONS IN THE... Testing Plan or Mining Plan is disapproved because the lessee's failure to demonstrate compliance with the...
30 CFR 582.15 - Cancellation of leases.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 30 Mineral Resources 2 2013-07-01 2013-07-01 false Cancellation of leases. 582.15 Section 582.15 Mineral Resources BUREAU OF OCEAN ENERGY MANAGEMENT, DEPARTMENT OF THE INTERIOR OFFSHORE OPERATIONS IN THE... Testing Plan or Mining Plan is disapproved because the lessee's failure to demonstrate compliance with the...
First evidence for "The backup plan paradox".
Napolitano, Christopher M; Freund, Alexandra M
2017-08-01
This research is a first test of the backup plan paradox. We hypothesized that investing in a backup plan may facilitate the conditions that it was developed to address: Plan A's insufficiency. Five studies provide initial, primarily correlative support for the undermining effect of investing in a backup plan. Study 1 (n= 160) demonstrated that the more participants perceived they had invested in developing a backup plan (preparing a "crib sheet"), the more likely they were to use it, although greater investments were unrelated to backup plan utility. Studies 2-4 used a simulated negotiation task. Study 2 (n = 247) demonstrated that when goal-relevant resources are limited, investing in developing backup plans and perceiving them as highly instrumental can decrease goal performance through the indirect effect of increased means replacing. Study 3 (n = 248) replicated this effect when goal-relevant resources were plentiful. Study 4 (n = 204) used an experimental variant of the simulated negotiation task and demonstrated that simply having a backup plan is not detrimental, but perceiving backup plans to be highly instrumental decreased goal performance, again through the indirect effect of increased means replacing. Study 5 (n = 160) replicated findings from Studies 1-4 using a lab-based motor task (throwing a ball). Together, these results provide first evidence that backup plans can introduce costs that may jeopardize goal performance. (PsycINFO Database Record (c) 2017 APA, all rights reserved).
PDCI Wide-Area Damping Control: PSLF Simulations of the 2016 Open and Closed Loop Test Plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
Wilches Bernal, Felipe; Pierre, Brian Joseph; Elliott, Ryan Thomas
To demonstrate and validate the performance of the wide-are a damping control system, the project plans to conduct closed-loop tests on the PDCI in summer/fall 2016. A test plan details the open and closed loop tests to be conducted on the P DCI using the wide-area damping control system. To ensure the appropriate level of preparedness, simulations were performed in order to predict and evaluate any possible unsafe operations before hardware experiments are attempted. This report contains the result s from these simulations using the power system dynamics software PSLF (Power System Load Flow, trademark of GE). The simulations usemore » the WECC (Western Electricity Coordinating Council) 2016 light summer and heavy summer base cases.« less
Full-Scale Transport controlled Impact Demonstration
NASA Technical Reports Server (NTRS)
Hayduk, R. J. (Compiler)
1986-01-01
The controlled impact demonstration (CID) test of a transport aircraft took place on December 1, 1984, crashing at a prepared site on Rogers Dry Lakebed, Edwards Air Force Base, California. The demonstration was a setback for the antimisting kerosene (AMK) researchers. The impact conditions, considerably different from the planned scenario, exposed large quantities of degraded AMK and hydraulic fluid and caused unexpectedly hot ignition sources, bulk loss of fuel from the right wing, airflow patterns over the wings and fuselage that were untested on AMK, and fuel intrusion into the lower fuselage. The test was much more severe than planned and is generally considered to be unrepresentative of the type of survivable crash that would benefit from AMK. Ninety-seven percent of the sensors on the fuselage and wing structure, seats, dummies, restraint systems, galley, and bins were active at impact. A wealth of sensor data was collected from this once-in-a-lifetime research test. The flight data recorder experiments on board were also generally successful.
National remote computational flight research facility
NASA Technical Reports Server (NTRS)
Rediess, Herman A.
1989-01-01
The extension of the NASA Ames-Dryden remotely augmented vehicle (RAV) facility to accommodate flight testing of a hypersonic aircraft utilizing the continental United States as a test range is investigated. The development and demonstration of an automated flight test management system (ATMS) that uses expert system technology for flight test planning, scheduling, and execution is documented.
NASA Technical Reports Server (NTRS)
Sankar, S.; Livas, J.
2016-01-01
We describe our efforts to fabricate, test and characterize a prototype telescope for the eLISA mission. Much of our work has centered on the modeling and measurement of scattered light performance. This work also builds on a previous demonstration of a high dimensional stability metering structure using particular choices of materials and interfaces. We will discuss ongoing plans to merge these two separate demonstrations into a single telescope design demonstrating both stray light and dimensional stability requirements simultaneously.
DOT National Transportation Integrated Search
2000-01-01
This report demonstrates the benefits and potential pitfalls of deploying and operating an integrated freeway and arterial management system. In particular, it discusses the lessons learned about the Medical Center Corridor (MCC) Project deployed in ...
Development Activities on Airbreathing Combined Cycle Engines
NASA Technical Reports Server (NTRS)
McArthur, J. Craig; Lyles, Garry (Technical Monitor)
2000-01-01
Contents include the following: Advanced reusable transportation(ART); aerojet and rocketdyne tests, RBCC focused concept flowpaths,fabricate flight weigh, test select components, document ART project, Istar (Integrated system test of an airbreathing rocket); combined cycle propulsion testbed;hydrocarbon demonstrator tracebility; Istar engine system and vehicle system closure study; and Istar project planning.
Kodak AMSD Cryogenic Test Plans
NASA Technical Reports Server (NTRS)
Matthews, Gary; Hammon, John; Barrett, David; Russell, Kevin (Technical Monitor)
2002-01-01
NGST will be an IR based optical system that will operate at cryogenic temperatures. As part of the AMSD program, Kodak must demonstrate the ability of our system to perform at these very cold temperatures. Kodak will discuss the test approach that will be used for cryogenic testing at MSFC's XRCF.
Deep Throttle Turbopump Technology Testing
NASA Technical Reports Server (NTRS)
Ferguson, T. V.; Guinzburg, A.; McGlynn, R. D.; Williams, M.
2002-01-01
The objectives of this viewgraph presentation were to: (1) enhance and demonstrate critical technologies in support of planned RBCC flight test programs; and (2) obtain knowledge of wide flow range as it is applicable to liquid rocket engine turbopumps operating over extreme throttle ranges. This program was set up to demonstrate wide flow range diffuser technologies. The testing phase of the contract to provide data to anchor initial designs was partially successful. Data collected suggest flow phenomena exists at off-design flow rates.
Advanced Demonstration and Test Reactor Options Study
DOE Office of Scientific and Technical Information (OSTI.GOV)
Petti, David Andrew; Hill, R.; Gehin, J.
Global efforts to address climate change will require large-scale decarbonization of energy production in the United States and elsewhere. Nuclear power already provides 20% of electricity production in the United States (U.S.) and is increasing in countries undergoing rapid growth around the world. Because reliable, grid-stabilizing, low emission electricity generation, energy security, and energy resource diversity will be increasingly valued, nuclear power’s share of electricity production has a potential to grow. In addition, there are non electricity applications (e.g., process heat, desalination, hydrogen production) that could be better served by advanced nuclear systems. Thus, the timely development, demonstration, and commercializationmore » of advanced nuclear reactors could diversify the nuclear technologies available and offer attractive technology options to expand the impact of nuclear energy for electricity generation and non-electricity missions. The purpose of this planning study is to provide transparent and defensible technology options for a test and/or demonstration reactor(s) to be built to support public policy, innovation and long term commercialization within the context of the Department of Energy’s (DOE’s) broader commitment to pursuing an “all of the above” clean energy strategy and associated time lines. This planning study includes identification of the key features and timing needed for advanced test or demonstration reactors to support research, development, and technology demonstration leading to the commercialization of power plants built upon these advanced reactor platforms. This planning study is consistent with the Congressional language contained within the fiscal year 2015 appropriation that directed the DOE to conduct a planning study to evaluate “advanced reactor technology options, capabilities, and requirements within the context of national needs and public policy to support innovation in nuclear energy”. Advanced reactors are defined in this study as reactors that use coolants other than water. Advanced reactor technologies have the potential to expand the energy applications, enhance the competitiveness, and improve the sustainability of nuclear energy.« less
Design and Test Plans for a Non-Nuclear Fission Power System Technology Demonstration Unit
NASA Technical Reports Server (NTRS)
Mason, Lee; Palac, Donald; Gibson, Marc; Houts, Michael; Warren, John; Werner, James; Poston, David; Qualls, Arthur Lou; Radel, Ross; Harlow, Scott
2012-01-01
A joint National Aeronautics and Space Administration (NASA) and Department of Energy (DOE) team is developing concepts and technologies for affordable nuclear Fission Power Systems (FPSs) to support future exploration missions. A key deliverable is the Technology Demonstration Unit (TDU). The TDU will assemble the major elements of a notional FPS with a non-nuclear reactor simulator (Rx Sim) and demonstrate system-level performance in thermal vacuum. The Rx Sim includes an electrical resistance heat source and a liquid metal heat transport loop that simulates the reactor thermal interface and expected dynamic response. A power conversion unit (PCU) generates electric power utilizing the liquid metal heat source and rejects waste heat to a heat rejection system (HRS). The HRS includes a pumped water heat removal loop coupled to radiator panels suspended in the thermal-vacuum facility. The basic test plan is to subject the system to realistic operating conditions and gather data to evaluate performance sensitivity, control stability, and response characteristics. Upon completion of the testing, the technology is expected to satisfy the requirements for Technology Readiness Level 6 (System Demonstration in an Operational and Relevant Environment) based on the use of high-fidelity hardware and prototypic software tested under realistic conditions and correlated with analytical predictions.
Design and Test Plans for a Non-Nuclear Fission Power System Technology Demonstration Unit
NASA Astrophysics Data System (ADS)
Mason, L.; Palac, D.; Gibson, M.; Houts, M.; Warren, J.; Werner, J.; Poston, D.; Qualls, L.; Radel, R.; Harlow, S.
A joint National Aeronautics and Space Administration (NASA) and Department of Energy (DOE) team is developing concepts and technologies for affordable nuclear Fission Power Systems (FPSs) to support future exploration missions. A key deliverable is the Technology Demonstration Unit (TDU). The TDU will assemble the major elements of a notional FPS with a non-nuclear reactor simulator (Rx Sim) and demonstrate system-level performance in thermal vacuum. The Rx Sim includes an electrical resistance heat source and a liquid metal heat transport loop that simulates the reactor thermal interface and expected dynamic response. A power conversion unit (PCU) generates electric power utilizing the liquid metal heat source and rejects waste heat to a heat rejection system (HRS). The HRS includes a pumped water heat removal loop coupled to radiator panels suspended in the thermal-vacuum facility. The basic test plan is to subject the system to realistic operating conditions and gather data to evaluate performance sensitivity, control stability, and response characteristics. Upon completion of the testing, the technology is expected to satisfy the requirements for Technology Readiness Level 6 (System Demonstration in an Operational and Relevant Environment) based on the use of high-fidelity hardware and prototypic software tested under realistic conditions and correlated with analytical predictions.
NASA Technical Reports Server (NTRS)
Hanley, G. M.
1980-01-01
An evolutionary Satellite Power Systems development plan was prepared. Planning analysis was directed toward the evolution of a scenario that met the stated objectives, was technically possible and economically attractive, and took into account constraining considerations, such as requirements for very large scale end-to-end demonstration in a compressed time frame, the relative cost/technical merits of ground testing versus space testing, and the need for large mass flow capability to low Earth orbit and geosynchronous orbit at reasonable cost per pound.
Multiple IMU system test plan, volume 4. [subroutines for space shuttle requirements
NASA Technical Reports Server (NTRS)
Landey, M.; Vincent, K. T., Jr.; Whittredge, R. S.
1974-01-01
Operating procedures for this redundant system are described. A test plan is developed with two objectives. First, performance of the hardware and software delivered is demonstrated. Second, applicability of multiple IMU systems to the space shuttle mission is shown through detailed experiments with FDI algorithms and other multiple IMU software: gyrocompassing, calibration, and navigation. Gimbal flip is examined in light of its possible detrimental effects on FDI and navigation. For Vol. 3, see N74-10296.
NASA Technical Reports Server (NTRS)
Knighton, Donna L.
1992-01-01
A Flight Test Engineering Database Management System (FTE DBMS) was designed and implemented at the NASA Dryden Flight Research Facility. The X-29 Forward Swept Wing Advanced Technology Demonstrator flight research program was chosen for the initial system development and implementation. The FTE DBMS greatly assisted in planning and 'mass production' card preparation for an accelerated X-29 research program. Improved Test Plan tracking and maneuver management for a high flight-rate program were proven, and flight rates of up to three flights per day, two times per week were maintained.
Regenerative Life Support Evaluation
NASA Technical Reports Server (NTRS)
Kleiner, G. N.; Thompson, C. D.
1977-01-01
This paper describes the development plan and design concept of the Regenerative Life Support Evaluation (RLSE) planned for flight testing in the European Space Agency Spacelab. The development plan encompasses the ongoing advanced life support subsystem and a systems integration effort to evolve concurrently subsystem concepts that perform their function and can be integrated with other subsystems in a flight demonstration of a regenerative life support system. The design concept for RLSE comprises water-electrolysis O2 generation, electrochemically depolarized CO2 removal, and Sabatier CO2 reduction for atmosphere regeneration, urine vapor-compression distillation, and wash-water hyperfiltration for waste-water recovery. The flight demonstration by RLSE is an important step in qualifying the regenerative concepts for life support in space stations.
Murphy, Brenda L; Anderson, Gregory S; Bowles, Ron; Cox, Robin S
2014-01-01
Disaster resilience is the cornerstone of effective emergency management across all phases of a disaster from preparedness through response and recovery. To support community resilience planning in the Rural Disaster Resilience Project (RDRP) Planning Framework, a print-based version of the guide book and a suite of resilience planning tools were field tested in three communities representing different regions and geographies within Canada. The results provide a cross-case study analysis from which lessons learned can be extracted. The authors demonstrate that by encouraging resilience thinking and proactive planning even very small rural communities can harness their inherent strengths and resources to enhance their own disaster resilience, as undertaking the resilience planning process was as important as the outcomes.The resilience enhancement planning process must be flexible enough to allow each community to act independently to meet their own needs. The field sites demonstrate that any motivated group of individuals, representing a neighborhood or some larger area could undertake a resilience initiative, especially with the assistance of a bridging organization or tool such as the RDRP Planning Framework.
Analytical Verifications in Cryogenic Testing of NGST Advanced Mirror System Demonstrators
NASA Technical Reports Server (NTRS)
Cummings, Ramona; Levine, Marie; VanBuren, Dave; Kegley, Jeff; Green, Joseph; Hadaway, James; Presson, Joan; Cline, Todd; Stahl, H. Philip (Technical Monitor)
2002-01-01
Ground based testing is a critical and costly part of component, assembly, and system verifications of large space telescopes. At such tests, however, with integral teamwork by planners, analysts, and test personnel, segments can be included to validate specific analytical parameters and algorithms at relatively low additional cost. This paper opens with strategy of analytical verification segments added to vacuum cryogenic testing of Advanced Mirror System Demonstrator (AMSD) assemblies. These AMSD assemblies incorporate material and architecture concepts being considered in the Next Generation Space Telescope (NGST) design. The test segments for workmanship testing, cold survivability, and cold operation optical throughput are supplemented by segments for analytical verifications of specific structural, thermal, and optical parameters. Utilizing integrated modeling and separate materials testing, the paper continues with support plan for analyses, data, and observation requirements during the AMSD testing, currently slated for late calendar year 2002 to mid calendar year 2003. The paper includes anomaly resolution as gleaned by authors from similar analytical verification support of a previous large space telescope, then closes with draft of plans for parameter extrapolations, to form a well-verified portion of the integrated modeling being done for NGST performance predictions.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Gunning, Colleen, E-mail: Colleen_Gunning@health.qld.gov.a; Harris, Patrick; Mallett, John
2011-07-15
Health service and partners completed an equity focussed health impact assessment to influence the consideration of health and equity within regional land-use planning in Queensland, Australia. This project demonstrated how an equity oriented assessment matrix can assist in testing regional planning scenarios. It is hoped that this HIA will contribute to the emerging interest in ensuring that potential differential health impacts continue to be considered as part of land-use planning processes.
NASA Astrophysics Data System (ADS)
Lucas, G.; Lénárt, C.; Solymosi, J.
2015-08-01
This paper introduces research done on the automatic preparation of remediation plans and navigation data for the precise guidance of heavy machinery in clean-up work after an industrial disaster. The input test data consists of a pollution extent shapefile derived from the processing of hyperspectral aerial survey data from the Kolontár red mud disaster. Three algorithms were developed and the respective scripts were written in Python. The first model aims at drawing a parcel clean-up plan. The model tests four different parcel orientations (0, 90, 45 and 135 degree) and keeps the plan where clean-up parcels are less numerous considering it is an optimal spatial configuration. The second model drifts the clean-up parcel of a work plan both vertically and horizontally following a grid pattern with sampling distance of a fifth of a parcel width and keep the most optimal drifted version; here also with the belief to reduce the final number of parcel features. The last model aims at drawing a navigation line in the middle of each clean-up parcel. The models work efficiently and achieve automatic optimized plan generation (parcels and navigation lines). Applying the first model we demonstrated that depending on the size and geometry of the features of the contaminated area layer, the number of clean-up parcels generated by the model varies in a range of 4% to 38% from plan to plan. Such a significant variation with the resulting feature numbers shows that the optimal orientation identification can result in saving work, time and money in remediation. The various tests demonstrated that the model gains efficiency when 1/ the individual features of contaminated area present a significant orientation with their geometry (features are long), 2/ the size of pollution extent features becomes closer to the size of the parcels (scale effect). The second model shows only 1% difference with the variation of feature number; so this last is less interesting for planning optimization applications. Last model rather simply fulfils the task it was designed for by drawing navigation lines.
Demonstrations of Alternative Delivery Systems Under Medicare and Medicaid
Galblum, Trudi W.; Trieger, Sidney
1982-01-01
The current Administration supports competition as one method of helping to contain escalating costs. Proponents of competition claim many advantages to its implementation, but their claims have yet to be widely tested. Over the past several years, however, the Health Care Financing Administration has supported a number of Medicare and Medicaid demonstrations to yield information on plan participation, marketing, and reimbursement under alternative delivery systems. Much of these data are applicable to the competitive plans being considered by the Administration and Congress. This paper discusses recent findings from these projects. PMID:10309599
The Habitat Demonstration Unit Project Overview
NASA Technical Reports Server (NTRS)
Kennedy, Kriss J.; Grill, Tracy R.; Tri, Terry O.; Howe, Alan S.
2010-01-01
This paper will describe an overview of the National Aeronautics and Space Administration (NASA) led multi-center Habitat Demonstration Unit (HDU) Project. The HDU project is a "technology-pull" project that integrates technologies and innovations from numerous NASA centers. This project will be used to investigate and validate surface architectures, operations concepts, and requirements definition of various habitation concepts. The first habitation configuration this project will build and test is the Pressurized Excursion Module (PEM). This habitat configuration - the PEM - is based on the Constellation Architecture Scenario 12.1 concept of a vertically oriented habitat module. The HDU project will be tested as part of the 2010 Desert Research and Technologies Simulations (D-RATS) test objectives. The purpose of this project is to develop, integrate, test, and evaluate a habitat configuration in the context of the mission architectures and surface operation concepts. A multi-center approach will be leveraged to build, integrate, and test the PEM through a shared collaborative effort of multiple NASA centers. The HDU project is part of the strategic plan from the Exploration Systems Mission Directorate (ESMD) Directorate Integration Office (DIO) and the Lunar Surface Systems Project Office (LSSPO) to test surface elements in a surface analog environment. The 2010 analog field test will include two Lunar Electric Rovers (LER) and the PEM among other surface demonstration elements. This paper will describe the overall objectives, its various habitat configurations, strategic plan, and technology integration as it pertains to the 2010 and 2011 field analog tests. To accomplish the development of the PEM from conception in June 2009 to rollout for operations in July 2010, the HDU project team is using a set of design standards to define the interfaces between the various systems of PEM and to the payloads, such as the Geology Lab, that those systems will support. Scheduled activities such as early fit-checks and the utilization of a habitat avionics test bed prior to equipment installation into PEM are planned to facilitate the integration process.
Data acquisition and analysis plan.
DOT National Transportation Integrated Search
2008-03-01
The U.S. Department of Transportation (USDOT) Next Generation 9-1-1 (NG9-1-1) : Proof-of-Concept (POC) demonstration will test key features and functionalities of the : envisioned NG9-1-1 system. The POC will also serve as a test-bed to validate tech...
Terreros, D A; Martinez, R
1997-01-01
A multimedia telemedicine network is proposed for a VISN-19 test bed and it will include picture archiving and communication systems (PACS). Initial tests have been performed, and the technical feasibility of the basic plan has been demonstrated.
DOT National Transportation Integrated Search
2000-10-01
The Advanced Rural Traveler Information System (ARTIS) began development June 30, 1995. While a number of activities were underway to operationally test and evaluate metro or urban traveler information systems in the 75 target markets, ARTIS setout t...
Advanced Grid-Friendly Controls Demonstration Project for Utility-Scale PV Power Plants
DOE Office of Scientific and Technical Information (OSTI.GOV)
Gevorgian, Vahan; O'Neill, Barbara
A typical photovoltaic (PV) power plant consists of multiple power electronic inverters and can contribute to grid stability and reliability through sophisticated 'grid-friendly' controls. The availability and dissemination of actual test data showing the viability of advanced utility-scale PV controls among all industry stakeholders can leverage PV's value from being simply an energy resource to providing additional ancillary services that range from variability smoothing and frequency regulation to power quality. Strategically partnering with a selected utility and/or PV power plant operator is a key condition for a successful demonstration project. The U.S. Department of Energy's (DOE's) Solar Energy Technologies Officemore » selected the National Renewable Energy Laboratory (NREL) to be a principal investigator in a two-year project with goals to (1) identify a potential partner(s), (2) develop a detailed scope of work and test plan for a field project to demonstrate the gird-friendly capabilities of utility-scale PV power plants, (3) facilitate conducting actual demonstration tests, and (4) disseminate test results among industry stakeholders via a joint NREL/DOE publication and participation in relevant technical conferences. The project implementation took place in FY 2014 and FY 2015. In FY14, NREL established collaborations with AES and First Solar Electric, LLC, to conduct demonstration testing on their utility-scale PV power plants in Puerto Rico and Texas, respectively, and developed test plans for each partner. Both Puerto Rico Electric Power Authority and the Electric Reliability Council of Texas expressed interest in this project because of the importance of such advanced controls for the reliable operation of their power systems under high penetration levels of variable renewable generation. During FY15, testing was completed on both plants, and a large amount of test data was produced and analyzed that demonstrates the ability of PV power plants to provide various types of new grid-friendly controls.« less
DOT National Transportation Integrated Search
2012-04-01
This report presents the Exogenous Factors Test Plan for the national evaluation of the Los Angeles County Congestion Reduction Demonstration (LAC CRD) under the United States Department of Transportation (U.S. DOT) Congestion Reduction Demonstration...
Planned Axial Reorientation Investigation on Sloshsat
NASA Technical Reports Server (NTRS)
Chato, David J.
2000-01-01
This paper details the design and logic of an experimental investigation to study axial reorientation in low gravity. The Sloshsat free-flyer is described. The planned axial reorientation experiments and test matrixes are presented. Existing analytical tools are discussed. Estimates for settling range from 64 to 1127 seconds. The planned experiments are modelled using computational fluid dynamics. These models show promise in reducing settling estimates and demonstrate the ability of pulsed high thrust settling to emulate lower thrust continuous firing.
Test development for the thermionic system evaluation test (TSET) project
NASA Astrophysics Data System (ADS)
Morris, D. Brent; Standley, Vaughn H.; Schuller, Michael J.
1992-01-01
The arrival of a Soviet TOPAZ-II space nuclear reactor affords the US space nuclear power (SNP) community the opportunity to study an assembled thermionic conversion power system. The TOPAZ-II will be studied via the Thermionic System Evaluation Test (TSET) Project. This paper is devoted to the discussion of TSET test development as related to the objectives contained in the TSET Project Plan (Standley et al. 1991). The objectives contained in the Project Plan are the foundation for scheduled TSET tests on TOPAZ-II and are derived from the needs of the Air Force Thermionic SNP program. Our ability to meet the objectives is bounded by unique constraints, such as procurement requirements, operational limitations, and necessary interaction between US and Soviet Scientists and engineers. The fulfillment of the test objectives involves a thorough methodology of test scheduling and data managment. The overall goals for the TSET program are gaining technical understanding of a thermionic SNP system and demonstrating the capabilities and limitations of such a system while assisting in the training of US scientist and engineers in preparation for US SNP system testing. Tests presently scheduled as part of TSET include setup, demonstration, and verification tests; normal and off-normal operating test, and system and component performance tests.
MO-F-16A-01: Implementation of MPPG TPS Verification Tests On Various Accelerators
DOE Office of Scientific and Technical Information (OSTI.GOV)
Smilowitz, J; Bredfeldt, J; Geurts, M
2014-06-15
Purpose: To demonstrate the implementation of the Medical Physics Practice Guideline (MPPG) for dose calculation and beam parameters verification of treatment planning systems (TPS). Methods: We implemented the draft TPS MPPG for three linacs: Varian Trilogy, TomoHDA and Elekta Infinity. Static and modulated test plans were created. The static fields are different than used in commissioning. Data was collected using ion chambers and diodes in a scanning water tank, Delta4 phantom and a custom phantom. MatLab and Microsoft Excel were used to create analysis tools to compare reference DICOM dose with scan data. This custom code allowed for the interpolation,more » registration and gamma analysis of arbitrary dose profiles. It will be provided as open source code. IMRT fields were validated with Delta4 registration and comparison tools. The time for each task was recorded. Results: The tests confirmed the strengths, and revealed some limitations, of our TPS. The agreement between calculated and measured dose was reported for all beams. For static fields, percent depth dose and profiles were analyzed with criteria in the draft MPPG. The results reveal areas of slight mismatch with the model (MLC leaf penumbra, buildup region.) For TomoTherapy, the IMRT plan 2%/2 mm gamma analysis revealed poorest agreement in the low dose regions. For one static test plan for all 10MV Trilogy photon beams, the plan generation, scan queue creation, data collection, data analysis and report took 2 hours, excluding tank setup. Conclusions: We have demonstrated the implementation feasibility of the TPS MPPG. This exercise generated an open source tool for dose comparisons between scan data and DICOM dose data. An easily reproducible and efficient infrastructure with streamlined data collection was created for repeatable robust testing of the TPS. The tests revealed minor discrepancies in our models and areas for improvement that are being investigated.« less
An Overview of an Experimental Demonstration Aerotow Program
NASA Technical Reports Server (NTRS)
Murray, James E.; Bowers, Albion H.; Lokos, William A.; Peters, Todd L.; Gera, Joseph
1998-01-01
An overview of an experimental demonstration of aerotowing a delta-wing airplane with low-aspect ratio and relatively high wing loading is presented. Aerotowing of future space launch configurations is a new concept, and the objective of the work described herein is to demonstrate the aerotow operation using an airplane configuration similar to conceptual space launch vehicles. Background information on the use of aerotow for a space launch vehicle is presented, and the aerotow system used in this demonstration is described. The ground tests, analytical studies, and flight planning used to predict system behavior and to enhance flight safety are detailed. The instrumentation suite and flight test maneuvers flown are discussed, preliminary performance is assessed, and flight test results are compared with the preflight predictions.
Fission Surface Power Technology Development Update
NASA Technical Reports Server (NTRS)
Palac, Donald T.; Mason, Lee S.; Houts, Michael G.; Harlow, Scott
2011-01-01
Power is a critical consideration in planning exploration of the surfaces of the Moon, Mars, and places beyond. Nuclear power is an important option, especially for locations in the solar system where sunlight is limited or environmental conditions are challenging (e.g., extreme cold, dust storms). NASA and the Department of Energy are maintaining the option for fission surface power for the Moon and Mars by developing and demonstrating technology for a fission surface power system. The Fission Surface Power Systems project has focused on subscale component and subsystem demonstrations to address the feasibility of a low-risk, low-cost approach to space nuclear power for surface missions. Laboratory demonstrations of the liquid metal pump, reactor control drum drive, power conversion, heat rejection, and power management and distribution technologies have validated that the fundamental characteristics and performance of these components and subsystems are consistent with a Fission Surface Power preliminary reference concept. In addition, subscale versions of a non-nuclear reactor simulator, using electric resistance heating in place of the reactor fuel, have been built and operated with liquid metal sodium-potassium and helium/xenon gas heat transfer loops, demonstrating the viability of establishing system-level performance and characteristics of fission surface power technologies without requiring a nuclear reactor. While some component and subsystem testing will continue through 2011 and beyond, the results to date provide sufficient confidence to proceed with system level technology readiness demonstration. To demonstrate the system level readiness of fission surface power in an operationally relevant environment (the primary goal of the Fission Surface Power Systems project), a full scale, 1/4 power Technology Demonstration Unit (TDU) is under development. The TDU will consist of a non-nuclear reactor simulator, a sodium-potassium heat transfer loop, a power conversion unit with electrical controls, and a heat rejection system with a multi-panel radiator assembly. Testing is planned at the Glenn Research Center Vacuum Facility 6 starting in 2012, with vacuum and liquid-nitrogen cold walls to provide simulation of operationally relevant environments. A nominal two-year test campaign is planned including a Phase 1 reactor simulator and power conversion test followed by a Phase 2 integrated system test with radiator panel heat rejection. The testing is expected to demonstrate the readiness and availability of fission surface power as a viable power system option for NASA's exploration needs. In addition to surface power, technology development work within this project is also directly applicable to in-space fission power and propulsion systems.
EPRI/DOE High Burnup Fuel Sister Pin Test Plan Simplification and Visualization
DOE Office of Scientific and Technical Information (OSTI.GOV)
Saltzstein, Sylvia J.; Sorenson, Ken B.; Hanson, Brady
The EPRI/DOE High Burnup Confirmatory Data Project (herein called the "Demo") is a multi-year, multi-entity confirmation demonstration test with the purpose of providing quantitative and qualitative data to show how high-burnup fuel ages in dry storage over a ten-year period. The Demo involves obtaining 32 assemblies of high-burnup PWR fuel of four common cladding alloys from the North Anna Nuclear Power Plant, drying them according to standard plant procedures, and then storing them in an NRC-licensed TN-3 2B cask on the North Anna dry storage pad for ten years. After the ten-year storage time, the cask will be opened andmore » the rods will be examined for signs of aging. Twenty-five rods from assemblies of similar claddings, in-reactor placement, and burnup histories (herein called "sister rods") have been shipped from the North Anna Nuclear Power Plant and are currently being nondestructively tested at Oak Ridge National Laboratory. After the non-destructive testing has been completed for each of the twenty-five rods, destructive analysis will be performed at ORNL, PNNL, and ANL to obtain mechanical data. Opinions gathered from the expert interviews, ORNL and PNNL Sister Rod Test Plans, and numerous meetings has resulted in the Simplified Test Plan described in this document. Some of the opinions and discussions leading to the simplified test plan are included here. Detailed descriptions and background are in the ORNL and PNNL plans in the appendices . After the testing described in this simplified test plan h as been completed , the community will review all the collected data and determine if additional testing is needed.« less
Research in Satellite-Fiber Network Interoperability
NASA Technical Reports Server (NTRS)
Edelson, Burt
1997-01-01
This four part report evaluated the performance of high data rate transmission links using the ACTS satellite, and to provide a preparatory test framework for two of the space science applications that have been approved for tests and demonstrations as part of the overall ACTS program. The test plan will provide guidance and information necessary to find the optimal values of the transmission parameters and then apply these parameters to specific applications. The first part will focus on the satellite-to-earth link. The second part is a set of tests to study the performance of ATM on the ACTS channel. The third and fourth parts of the test plan will cover the space science applications, Global Climate Modeling and Keck Telescope Acquisition Modeling and Control.
Development and Testing of a High Stability Engine Control (HISTEC) System
NASA Technical Reports Server (NTRS)
Orme, John S.; DeLaat, John C.; Southwick, Robert D.; Gallops, George W.; Doane, Paul M.
1998-01-01
Flight tests were recently completed to demonstrate an inlet-distortion-tolerant engine control system. These flight tests were part of NASA's High Stability Engine Control (HISTEC) program. The objective of the HISTEC program was to design, develop, and flight demonstrate an advanced integrated engine control system that uses measurement-based, real-time estimates of inlet airflow distortion to enhance engine stability. With improved stability and tolerance of inlet airflow distortion, future engine designs may benefit from a reduction in design stall-margin requirements and enhanced reliability, with a corresponding increase in performance and decrease in fuel consumption. This paper describes the HISTEC methodology, presents an aircraft test bed description (including HISTEC-specific modifications) and verification and validation ground tests. Additionally, flight test safety considerations, test plan and technique design and approach, and flight operations are addressed. Some illustrative results are presented to demonstrate the type of analysis and results produced from the flight test program.
Action-State Orientation and the Theory of Planned Behavior: A Study of Job Search in China
ERIC Educational Resources Information Center
Song, Zhaoli; Wanberg, Connie; Niu, Xiongying; Xie, Yizhong
2006-01-01
Job search is an important element of people's careers and is especially critical for unemployed individuals. The current study surveyed a sample of 328 unemployed job seekers in China to test hypotheses related to the theory of planned behavior and action-state orientation theory. Results of the three-wave longitudinal study demonstrated that the…
Carbon-carbon primary structure for SSTO vehicles
NASA Astrophysics Data System (ADS)
Croop, Harold C.; Lowndes, Holland B.
1997-01-01
A hot structures development program is nearing completion to validate use of carbon-carbon composite structure for primary load carrying members in a single-stage-to-orbit, or SSTO, vehicle. A four phase program was pursued which involved design development and fabrication of a full-scale wing torque box demonstration component. The design development included vehicle and component selection, design criteria and approach, design data development, demonstration component design and analysis, test fixture design and analysis, demonstration component test planning, and high temperature test instrumentation development. The fabrication effort encompassed fabrication of structural elements for mechanical property verification as well as fabrication of the demonstration component itself and associated test fixturing. The demonstration component features 3D woven graphite preforms, integral spars, oxidation inhibited matrix, chemical vapor deposited (CVD) SiC oxidation protection coating, and ceramic matrix composite fasteners. The demonstration component has been delivered to the United States Air Force (USAF) for testing in the Wright Laboratory Structural Test Facility, WPAFB, OH. Multiple thermal-mechanical load cycles will be applied simulating two atmospheric cruise missions and one orbital mission. This paper discusses the overall approach to validation testing of the wing box component and presents some preliminary analytical test predictions.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Brainard, E.L.
1978-04-25
Results are presented of acceptance tests conducted on the Alternator Stator, S/N 002, for the Kilowatt Isotope Power System. These results show that the Alternator Stator, S/N 002 for the Kilowatt Isotope Power System has satisfactorily completed the testing set forth within Sundstrand Test Specification 2538. Test requirements of TS 2538 were extracted from the Kilowatt Isotope Power System, and Phase I Test Plan.
Max Launch Abort System (MLAS) Landing Parachute Demonstrator (LPD) Drop Test
NASA Technical Reports Server (NTRS)
Shreves, Christopher M.
2011-01-01
The Landing Parachute Demonstrator (LPD) was conceived as a low-cost, rapidly-developed means of providing soft landing for the Max Launch Abort System (MLAS) crew module (CM). Its experimental main parachute cluster deployment technique and off-the-shelf hardware necessitated a full-scale drop test prior to the MLAS mission in order to reduce overall mission risk. This test was successfully conducted at Wallops Flight Facility on March 6, 2009, with all vehicle and parachute systems functioning as planned. The results of the drop test successfully qualified the LPD system for the MLAS flight test. This document captures the design, concept of operations and results of the drop test.
77 FR 60915 - Revisions to the Nevada State Implementation Plan, Washoe County Air Quality District
Federal Register 2010, 2011, 2012, 2013, 2014
2012-10-05
... compliance with permit conditions, recordkeeping, source sampling and testing, and statements of compliance... Demonstration of Compliance. WCDBOH 030.230 Record Keeping. WCDBOH 030.235 Requirements for Source Sampling... Federal Register Sampling and page number Testing''. where the document begins]. * * * * * * * 030.970A...
Wiener, J M; Ehbauer, N N; Mallot, H A
2009-09-01
For large numbers of targets, path planning is a complex and computationally expensive task. Humans, however, usually solve such tasks quickly and efficiently. We present experiments studying human path planning performance and the cognitive processes and heuristics involved. Twenty-five places were arranged on a regular grid in a large room. Participants were repeatedly asked to solve traveling salesman problems (TSP), i.e., to find the shortest closed loop connecting a start location with multiple target locations. In Experiment 1, we tested whether humans employed the nearest neighbor (NN) strategy when solving the TSP. Results showed that subjects outperform the NN-strategy, suggesting that it is not sufficient to explain human route planning behavior. As a second possible strategy we tested a hierarchical planning heuristic in Experiment 2, demonstrating that participants first plan a coarse route on the region level that is refined during navigation. To test for the relevance of spatial working memory (SWM) and spatial long-term memory (LTM) for planning performance and the planning heuristics applied, we varied the memory demands between conditions in Experiment 2. In one condition the target locations were directly marked, such that no memory was required; a second condition required participants to memorize the target locations during path planning (SWM); in a third condition, additionally, the locations of targets had to retrieved from LTM (SWM and LTM). Results showed that navigation performance decreased with increasing memory demands while the dependence on the hierarchical planning heuristic increased.
NASA Technical Reports Server (NTRS)
Koenig, John C.; Billitti, Joseph W.; Tallon, John M.
1979-01-01
Guidelines are provided to the Field Centers for organization, scheduling, project and cost control, and performance in the areas of project management and operations planning for Photovoltaics Test and Applications. These guidelines may be used in organizing a T and A Project Team for system design/test, site construction and operation, and as the basis for evaluating T and A proposals. The attributes are described for project management and operations planning to be used by the Field Centers. Specifically, all project management and operational issues affecting costs, schedules and performance of photovoltaic systems are addressed. Photovoltaic tests and applications include residential, intermediate load center, central station, and stand-alone systems. The sub-categories of system maturity considered are: Initial System Evaluation Experiments (ISEE); System Readiness Experiments (SRE); and Commercial Readiness Demonstration Projects (CRDP).
Engineering design and test plan for demonstrating DETOX treatment of mixed wastes
DOE Office of Scientific and Technical Information (OSTI.GOV)
Goldblatt, S.; Dhooge, P.
1995-03-01
DETOX is a cocatalyzed wet oxidation process in which the catalysts are a relatively great concentration of iron ions (typically as iron(III) chloride) in the presence of small amounts of platinum and ruthenium ions. Organic compounds are oxidized completely to carbon dioxide, water, and (if chlorinated) hydrogen chloride. The process has shown promise as a non-thermal alternative to incineration for treatment and/or volume reduction of hazardous, radioactive, and mixed wastes. Design and fabrication of a demonstration unit capable of destroying 25. Kg/hr of organic material is now in progress. This paper describes the Title 2 design of the demonstration unit,more » and the planned demonstration effort at Savannah River Site (SRS) and Weldon Spring Site Remedial Action Project (WSSRAP).« less
General Summary of the National Long-Term Care Channeling Demonstration. Revised.
ERIC Educational Resources Information Center
Office of the Assistant Secretary for Planning and Evaluation (DHHS), Washington, DC.
This paper summarizes the National Long-Term Care Channeling Demonstration Program, a project designed to test the feasibility and cost effectiveness of an alternative community-based long-term care service delivery concept for the frail elderly which integrated health and social services. Program management and early federal planning efforts are…
Decision Models for Determining the Optimal Life Test Sampling Plans
NASA Astrophysics Data System (ADS)
Nechval, Nicholas A.; Nechval, Konstantin N.; Purgailis, Maris; Berzins, Gundars; Strelchonok, Vladimir F.
2010-11-01
Life test sampling plan is a technique, which consists of sampling, inspection, and decision making in determining the acceptance or rejection of a batch of products by experiments for examining the continuous usage time of the products. In life testing studies, the lifetime is usually assumed to be distributed as either a one-parameter exponential distribution, or a two-parameter Weibull distribution with the assumption that the shape parameter is known. Such oversimplified assumptions can facilitate the follow-up analyses, but may overlook the fact that the lifetime distribution can significantly affect the estimation of the failure rate of a product. Moreover, sampling costs, inspection costs, warranty costs, and rejection costs are all essential, and ought to be considered in choosing an appropriate sampling plan. The choice of an appropriate life test sampling plan is a crucial decision problem because a good plan not only can help producers save testing time, and reduce testing cost; but it also can positively affect the image of the product, and thus attract more consumers to buy it. This paper develops the frequentist (non-Bayesian) decision models for determining the optimal life test sampling plans with an aim of cost minimization by identifying the appropriate number of product failures in a sample that should be used as a threshold in judging the rejection of a batch. The two-parameter exponential and Weibull distributions with two unknown parameters are assumed to be appropriate for modelling the lifetime of a product. A practical numerical application is employed to demonstrate the proposed approach.
Remote Excavation System technology evaluation report: Buried Waste Robotics Program
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1993-09-01
This document describes the results from the Remote Excavation System demonstration and testing conducted at the Idaho National Engineering Laboratory during June and July 1993. The purpose of the demonstration was to ascertain the feasibility of the system for skimming soil and removing various types of buried waste in a safe manner and within all regulatory requirements, and to compare the performances of manual and remote operation of a backhoe. The procedures and goals of the demonstration were previously defined in The Remote Excavation System Test Plan, which served as a guideline for evaluating the various components of the systemmore » and discussed the procedures used to conduct the tests.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
This plan covers robotics Research, Development, Demonstration, Testing and Evaluation activities in the Program for the next five years. These activities range from bench-scale R D to full-scale hot demonstrations at DOE sites. This plan outlines applications of existing technology to near-term needs, the development and application of enhanced technology for longer-term needs, and initiation of advanced technology development to meet those needs beyond the five-year plan. The objective of the Robotic Technology Development Program (RTDP) is to develop and apply robotics technologies that will enable Environmental Restoration and Waste Management (ER WM) operations at DOE sites to be safer,more » faster and cheaper. Five priority DOE sites were visited in March 1990 to identify needs for robotics technology in ER WM operations. This 5-Year Program Plan for the RTDP detailed annual plans for robotics technology development based on identified needs. In July 1990 a forum was held announcing the robotics program. Over 60 organizations (industrial, university, and federal laboratory) made presentations on their robotics capabilities. To stimulate early interactions with the ER WM activities at DOE sites, as well as with the robotics community, the RTDP sponsored four technology demonstrations related to ER WM needs. These demonstrations integrated commercial technology with robotics technology developed by DOE in support of areas such as nuclear reactor maintenance and the civilian reactor waste program. 2 figs.« less
Aviation Careers: The Sky's the Limit
DOT National Transportation Integrated Search
1996-07-29
AMASCOT demonstrated and evaluated the feasibility of automating the collection of mileage-by-jurisdiction data and electronic data interchange for International Fuel Tax Agreement (IFTA) and International Registration Plan (IRP) reporting. The test ...
Reusable LH2 tank technology demonstration through ground test
NASA Technical Reports Server (NTRS)
Bianca, C.; Greenberg, H. S.; Johnson, S. E.
1995-01-01
The paper presents the project plan to demonstrate, by March 1997, the reusability of an integrated composite LH2 tank structure, cryogenic insulation, and thermal protection system (TPS). The plan includes establishment of design requirements and a comprehensive trade study to select the most suitable Reusable Hydrogen Composite Tank system (RHCTS) within the most suitable of 4 candidate structural configurations. The 4 vehicles are winged body with the capability to deliver 25,000 lbs of payload to a circular 220 nm, 51.6 degree inclined orbit (also 40,000 lbs to a 28.5 inclined 150 nm orbit). A prototype design of the selected RHCTS is established to identify the construction, fabrication, and stress simulation and test requirements necessary in an 8 foot diameter tank structure/insulation/TPS test article. A comprehensive development test program supports the 8 foot test article development and involves the composite tank itself, cryogenic insulation, and integrated tank/insulation/TPS designs. The 8 foot diameter tank will contain the integrated cryogenic insulation and TPS designs resulting from this development and that of the concurrent lightweight durable TPS program. Tank ground testing will include 330 cycles of LH2 filling, pressurization, body loading, depressurization, draining, and entry heating.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Kramer, William; Martin, Greg; Lundstrom, Blake
Portland General Electric (PGE) is installing a 5-megawatt (MW) lithium-ion-based battery-inverter system (BIS) in Salem, Oregon, as part of the Pacific Northwest Smart Grid Demonstration Project. NREL will assist PGE in testing a 250-kilovolt-ampere (kVA) portion of the BIS in order to verify correct operation and minimize risk to subsequent demonstrations. In this project NREL will providetechnical support for the 250-kVA test and will work with PGE to write a test plan and evaluate the system in the lab before deployment in the field.
NASA Technical Reports Server (NTRS)
1980-01-01
Project planning data for a rotor and control system procurement and testing program for modifications to the XV-15 tilt-rotor research demonstrator aircraft is presented. The design, fabrication, and installation of advanced composite blades compatible with the existing hub, an advanced composite hub, and a nonmechanical control system are required.
Biometric identification standards research
DOT National Transportation Integrated Search
2012-08-01
This report presents the test plan for conducting the Air Quality Analysis for the United States Department of Transportation (U.S. DOT) evaluation of the San Diego Integrated Corridor Management (ICM) Initiative Demonstration. The ICM projects being...
1996 national fleet safety survey
DOT National Transportation Integrated Search
2011-08-01
This report presents the test plan for collecting and analyzing data survey and interview data for the Atlanta Congestion Reduction Demonstration (CRD) under the United States Department of Transportation (U.S. DOT) Urban Partnership Agreement (UPA) ...
Reliability Demonstration Approach for Advanced Stirling Radioisotope Generator
NASA Technical Reports Server (NTRS)
Ha, CHuong; Zampino, Edward; Penswick, Barry; Spronz, Michael
2010-01-01
Developed for future space missions as a high-efficiency power system, the Advanced Stirling Radioisotope Generator (ASRG) has a design life requirement of 14 yr in space following a potential storage of 3 yr after fueling. In general, the demonstration of long-life dynamic systems remains difficult in part due to the perception that the wearout of moving parts cannot be minimized, and associated failures are unpredictable. This paper shows a combination of systematic analytical methods, extensive experience gained from technology development, and well-planned tests can be used to ensure a high level reliability of ASRG. With this approach, all potential risks from each life phase of the system are evaluated and the mitigation adequately addressed. This paper also provides a summary of important test results obtained to date for ASRG and the planned effort for system-level extended operation.
Joint operations planning for space surveillance missions on the MSX satellite
NASA Technical Reports Server (NTRS)
Stokes, Grant; Good, Andrew
1994-01-01
The Midcourse Space Experiment (MSX) satellite, sponsored by BMDO, is intended to gather broad-band phenomenology data on missiles, plumes, naturally occurring earthlimb backgrounds and deep space backgrounds. In addition the MSX will be used to conduct functional demonstrations of space-based space surveillance. The JHU/Applied Physics Laboratory (APL), located in Laurel, MD, is the integrator and operator of the MSX satellite. APL will conduct all operations related to the MSX and is charged with the detailed operations planning required to implement all of the experiments run on the MSX except the space surveillance experiments. The non-surveillance operations are generally amenable to being defined months ahead of time and being scheduled on a monthly basis. Lincoln Laboratory, Massachusetts Institute of Technology (LL), located in Lexington, MA, is the provider of one of the principle MSX instruments, the Space-Based Visible (SBV) sensor, and the agency charged with implementing the space surveillance demonstrations on the MSX. The planning timelines for the space surveillance demonstrations are fundamentally different from those for the other experiments. They are generally amenable to being scheduled on a monthly basis, but the specific experiment sequence and pointing must be refined shortly before execution. This allocation of responsibilities to different organizations implies the need for a joint mission planning system for conducting space surveillance demonstrations. This paper details the iterative, joint planning system, based on passing responsibility for generating MSX commands for surveillance operations from APL to LL for specific scheduled operations. The joint planning system, including the generation of a budget for spacecraft resources to be used for surveillance events, has been successfully demonstrated during ground testing of the MSX and is being validated for MSX launch within the year. The planning system developed for the MSX forms a model possibly applicable to developing distributed mission planning systems for other multi-use satellites.
NASA Technical Reports Server (NTRS)
Hass, Neal E.; Cabell, Karen F.; Storch, Andrea M.
2010-01-01
The initial phase of hydrocarbon-fueled ground tests supporting Flight 2 of the Hypersonic International Flight Research Experiment (HIFiRE) Program has been conducted in the NASA Langley Arc-Heated Scramjet Test Facility (AHSTF). The HIFiRE Program, an Air Force-lead international cooperative program includes eight different flight test experiments designed to target specific challenges of hypersonic flight. The second of the eight planned flight experiments is a hydrocarbon-fueled scramjet flight test intended to demonstrate dual-mode to scramjet-mode operation and verify the scramjet performance prediction and design tools. A performance goal is the achievement of a combusted fuel equivalence ratio greater than 0.7 while in scramjet mode. The ground test rig, designated the HIFiRE Direct Connect Rig (HDCR), is a full-scale, heat sink, direct-connect ground test article that duplicates both the flowpath lines and the instrumentation layout of the isolator and combustor portion of the flight test hardware. The primary objectives of the HDCR Phase I tests are to verify the operability of the HIFiRE isolator/combustor across the Mach 6.0-8.0 flight regime and to establish a fuel distribution schedule to ensure a successful mode transition prior to the HiFIRE payload Critical Design Review. Although the phase I test plans include testing over the Mach 6 to 8 flight simulation range, only Mach 6 testing will be reported in this paper. Experimental results presented here include flowpath surface pressure, temperature, and heat flux distributions that demonstrate the operation of the flowpath over a small range of test conditions around the nominal Mach 6 simulation, as well as a range of fuel equivalence ratios and fuel injection distributions. Both ethylene and a mixture of ethylene and methane (planned for flight) were tested. Maximum back pressure and flameholding limits, as well as a baseline fuel schedule, that covers the Mach 5.84-6.5 test space have been identified.
Heat Pipe Powered Stirling Conversion for the Demonstration Using Flattop Fission (DUFF) Test
NASA Technical Reports Server (NTRS)
Gibson, Marc A.; Briggs, Maxwell H.; Sanzi, James L.; Brace, Michael H.
2013-01-01
Design concepts for small Fission Power Systems (FPS) have shown that heat pipe cooled reactors provide a passive, redundant, and lower mass option to transfer heat from the fuel to the power conversion system, as opposed to pumped loop designs typically associated with larger FPS. Although many systems have been conceptually designed and a few making it to electrically heated testing, none have been coupled to a real nuclear reactor. A demonstration test named DUFF Demonstration Using Flattop Fission, was planned by the Los Alamos National Lab (LANL) to use an existing criticality experiment named Flattop to provide the nuclear heat source. A team from the NASA Glenn Research Center designed, built, and tested a heat pipe and power conversion system to couple to Flattop with the end goal of making electrical power. This paper will focus on the design and testing performed in preparation for the DUFF test.
Brunie, Aurélie; Wamala-Mucheri, Patricia; Akol, Angela; Mercer, Sarah; Chen, Mario
2016-10-01
Improving HIV testing and counselling (HTC) requires a range of strategies. This article reports on HTC service delivery by Village Health Teams (VHTs) in Uganda in the context of a model integrating this new component into pre-existing family planning services. Eight health centres from matched pairs were randomly allocated to intervention or control. After being trained, 36 VHTs reporting to selected facilities in the intervention group started offering HTC along with family planning, while VHTs in the control group provided family planning only. Proficiency testing was conducted as external quality assurance. A survey of all 36 VHTs and 137 family planning clients in the intervention group and 119 clients in the control group and a review of record data were conducted after 10 months. Survey responses by VHTs and their clients in the intervention group demonstrate knowledge of counselling messages and safe testing. External quality assessment results provide additional evidence of competency. Eighty per cent of the family planning clients surveyed in the intervention group received an HIV test during the intervention; 27% of those were first-time testers. More clients had ever tested for HIV in the intervention group compared with the control; clients also retested more often. Findings indicate that this model is feasible and acceptable for expanding quality HTC into communities. This study was registered with ClinicalTrials.gov, number [NCT02244398]. © The Author 2016. Published by Oxford University Press. All rights reserved. For permissions, please e-mail: journals.permissions@oup.com.
Peroxide Propulsion at the Turn of the Century
NASA Technical Reports Server (NTRS)
Anderson, William E.; Butler, Kathy; Crocket, Dave; Lewis, Tim; McNeal, Curtis
2000-01-01
A resurgence of interest in peroxide propulsion has occurred in the last years of the 21st Century. This interest is driven by the need for lower cost propulsion systems and the need for storable reusable propulsion systems to meet future space transportation system architectures. NASA and the Air Force are jointly developing two propulsion systems for flight demonstration early in the 21st Century. One system will be a development of Boeing's AR2-3 engine, which was successfully fielded in the 1960s. The other is a new pressure-fed design by Orbital Sciences Corporation for expendable mission requirements. Concurrently NASA and industry are pursuing the key peroxide technologies needed to design, fabricate, and test advanced peroxide engines to meet the mission needs beyond 2005. This paper will present a description of the AR2-3, report the status of its current test program, and describe its intended flight demonstration. This paper will then describe the Orbital 10K engine, the status of its test program, and describe its planned flight demonstration. Finally the paper will present a plan, or technology roadmap, for the development of an advanced peroxide engine for the 21st Century.
Symbol signing design for older drivers
DOT National Transportation Integrated Search
2012-09-01
This report presents the Surveys, Interviews, and Workshops Test Plan for the national evaluation of the Los Angeles (LA) Congestion Reduction Demonstration (Metro ExpressLanes) under the United States Department of Transportation (U.S. DOT) Congesti...
Atlanta congestion reduction demonstration. National evaluation : content analysis test plan.
DOT National Transportation Integrated Search
2000-05-30
Commercial Vehicle Information Systems and Networks (CVISN) is the collection of information systems and communication networks that support commercial vehicle operations (CVO.) The National ITS Architecture provides a technical framework that descri...
Atlanta congestion reduction demonstration. National evaluation : safety data test plan.
DOT National Transportation Integrated Search
1996-12-01
This paper describes the various advance technologies already in use in the intermodal freight transportation industry and addresses the opportunity for improved communication between the public and private sector regarding technology applications to...
Hazardous materials risk assessment : phase I
DOT National Transportation Integrated Search
2011-08-01
This report presents the test plan for collecting and analyzing transit system data for the Atlanta Congestion Reduction Demonstration (CRD) under the United States Department of Transportation (U.S. DOT) Urban Partnership Agreement (UPA) and CRD Pro...
An Analysis of Test And Evaluation in Rapid Acquisition Programs
2015-12-01
program manager is assigned the requirement and allocated resources to carry out with an acquisition plan. 2. Role of Test and Evaluation Test and...Manual, verify the Maintenance Allocation Chart, and ensure the completeness of the System Support Package. The Maintainability Demonstration measured...additional outside personnel that require additional logistics support, such as security, facilitates, and berthing placing additional strain on units. CLS
NASA Technical Reports Server (NTRS)
Power, J. C.
1978-01-01
A planned flight test of an 8 cm diameter, electron-bombardment mercury ion thruster system is described. The primary objective of the test is to flight qualify the 5 mN (1 mlb.) thruster system for auxiliary propulsion applications. A seven year north-south stationkeeping mission was selected as the basis for the flight test operating profile. The flight test, which will employ two thruster systems, will also generate thruster system space performance data, measure thruster-spacecraft interactions, and demonstrate thruster operation in a number of operating modes. The flight test is designated as SAMSO-601 and will be flown aboard the shuttle-launched Air Force space test program P80-1 satellite in 1981. The spacecraft will be 3- axis stabilized in its final 740 km circular orbit, which will have an inclination of approximately greater than 73 degrees. The spacecraft design lifetime is three years.
An Overview of NASA Efforts on Zero Boiloff Storage of Cryogenic Propellants
NASA Technical Reports Server (NTRS)
Hastings, Leon J.; Plachta, D. W.; Salerno, L.; Kittel, P.; Haynes, Davy (Technical Monitor)
2001-01-01
Future mission planning within NASA has increasingly motivated consideration of cryogenic propellant storage durations on the order of years as opposed to a few weeks or months. Furthermore, the advancement of cryocooler and passive insulation technologies in recent years has substantially improved the prospects for zero boiloff storage of cryogenics. Accordingly, a cooperative effort by NASA's Ames Research Center (ARC), Glenn Research Center (GRC), and Marshall Space Flight Center (MSFC) has been implemented to develop and demonstrate "zero boiloff" concepts for in-space storage of cryogenic propellants, particularly liquid hydrogen and oxygen. ARC is leading the development of flight-type cryocoolers, GRC the subsystem development and small scale testing, and MSFC the large scale and integrated system level testing. Thermal and fluid modeling involves a combined effort by the three Centers. Recent accomplishments include: 1) development of "zero boiloff" analytical modeling techniques for sizing the storage tankage, passive insulation, cryocooler, power source mass, and radiators; 2) an early subscale demonstration with liquid hydrogen 3) procurement of a flight-type 10 watt, 95 K pulse tube cryocooler for liquid oxygen storage and 4) assembly of a large-scale test article for an early demonstration of the integrated operation of passive insulation, destratification/pressure control, and cryocooler (commercial unit) subsystems to achieve zero boiloff storage of liquid hydrogen. Near term plans include the large-scale integrated system demonstration testing this summer, subsystem testing of the flight-type pulse-tube cryocooler with liquid nitrogen (oxygen simulant), and continued development of a flight-type liquid hydrogen pulse tube cryocooler.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Carter, R.J.
1997-04-01
The primary purpose of the "modification and validation of an automotive data processing unit (DPU), compressed video system, and communications equipment" cooperative research and development agreement (CRADA) was to modify and validate both hardware and software, developed by Scientific Atlanta, Incorporated (S-A) for defense applications (e.g., rotary-wing airplanes), for the commercial sector surface transportation domain (i.e., automobiles and trucks). S-A also furnished a state-of-the-art compressed video digital storage and retrieval system (CVDSRS), and off-the-shelf data storage and transmission equipment to support the data acquisition system for crash avoidance research (DASCAR) project conducted by Oak Ridge National Laboratory (ORNL). In turn,more » S-A received access to hardware and technology related to DASCAR. DASCAR was subsequently removed completely and installation was repeated a number of times to gain an accurate idea of complete installation, operation, and removal of DASCAR. Upon satisfactory completion of the DASCAR construction and preliminary shakedown, ORNL provided NHTSA with an operational demonstration of DASCAR at their East Liberty, OH test facility. The demonstration included an on-the-road demonstration of the entire data acquisition system using NHTSA'S test track. In addition, the demonstration also consisted of a briefing, containing the following: ORNL generated a plan for validating the prototype data acquisition system with regard to: removal of DASCAR from an existing vehicle, and installation and calibration in other vehicles; reliability of the sensors and systems; data collection and transmission process (data integrity); impact on the drivability of the vehicle and obtrusiveness of the system to the driver; data analysis procedures; conspicuousness of the vehicle to other drivers; and DASCAR installation and removal training and documentation. In order to identify any operational problems not captured by the systems testing and evaluation, the validation plan also addressed a short-term pilot research program to manipulate DASCAR under operational conditions using "naive" drivers. The effort exercised the fill capabilities of the data acquisition system. ORNL subsequently evaluated and pilot tested the data acquisition system using the validation plan. The plan was implemented in full at the NHTSA East Liberty, OH test facility, and was carried out as a cooperative effort with the Vehicle Research and Test Center staff. ORNL determined the reliability of the sensors and systems by exercising DASCAR For one vehicle type, ORNL evaluated systems reliability over a continuous period of 30 days with particular attention paid to maintenance of calibration and data integrity.« less
1984-06-29
sheet metal, machined and composite parts and assembling the components into final pruJucts o Planning, evaluating, testing, inspecting and...Research showed that current programs were pursuing the design and demonstration of integrated centers for sheet metal, machining and composite ...determine any metal parts required and to schedule these requirements from the machining center. Figure 3-33, Planned Composite Production, shows
Automatic satellite capture and berthing with robot arm (ASCABRA)
NASA Technical Reports Server (NTRS)
Inaba, Noriyasu; Wakabayashi, Yasufumi; Iijima, Takahiko
1994-01-01
The NASDA office of R&D is studying an automatic technique to capture and berth free-floating satellites using a robot arm on another satellite. A demonstration experiment plan with the Japanese engineering test satellite ETS-7 is being developed based on the basic research on the ground. The overview and key technologies of this experiment plan are presented, and future applications of the automatic capture technique are also reviewed.
Commissioning and First Results from the Fermilab Cryomodule Test Stand
DOE Office of Scientific and Technical Information (OSTI.GOV)
Harms, Elvin; et al.
2017-05-01
A new test stand dedicated to SRF cryomodule testing, CMTS1, has been commissioned and is now in operation at Fermilab. The first device to be cooled down and powered in this facility is the prototype 1.3 GHz cryomodule assembled at Fermilab for LCLS-II. We describe the demonstrated capabilities of CMTS1, report on steps taken during commissioning, provide an overview of first test results, and survey future plans.
Delivery of Colloid Micro-Newton Thrusters for the Space Technology 7 Mission
NASA Technical Reports Server (NTRS)
Ziemer, John K.; Randolph, Thomas M.; Franklin, Garth W.; Hruby, Vlad; Spence, Douglas; Demmons, Nathaniel; Roy, Thomas; Ehrbar, Eric; Zwahlen, Jurg; Martin, Roy;
2008-01-01
Two flight-qualified clusters of four Colloid Micro-Newton Thruster (CMNT) systems have been delivered to the Jet Propulsion Laboratory (JPL). The clusters will provide precise spacecraft control for the drag-free technology demonstration mission, Space Technology 7 (ST7). The ST7 mission is sponsored by the NASA New Millennium Program and will demonstrate precision formation flying technologies for future missions such as the Laser Interferometer Space Antenna (LISA) mission. The ST7 disturbance reduction system (DRS) will be on the ESA LISA Pathfinder spacecraft using the European gravitational reference sensor (GRS) as part of the ESA LISA Technology Package (LTP). Developed by Busek Co. Inc., with support from JPL in design and testing, the CMNT has been developed over the last six years into a flight-ready and flight-qualified microthruster system, the first of its kind. Recent flight-unit qualification tests have included vibration and thermal vacuum environmental testing, as well as performance verification and acceptance tests. All tests have been completed successfully prior to delivery to JPL. Delivery of the first flight unit occurred in February of 2008 with the second unit following in May of 2008. Since arrival at JPL, the units have successfully passed through mass distribution, magnetic, and EMI/EMC measurements and tests as part of the integration and test (I&T) activities including the integrated avionics unit (IAU). Flight software sequences have been tested and validated with the full flight DRS instrument successfully to the extent possible in ground testing, including full functional and 72 hour autonomous operations tests. Delivery of the cluster assemblies along with the IAU to ESA for integration into the LISA Pathfinder spacecraft is planned for the summer of 2008 with a planned launch and flight demonstration in late 2010.
High-speed civil transport issues and technology program
NASA Technical Reports Server (NTRS)
Hewett, Marle D.
1992-01-01
A strawman program plan is presented, consisting of technology developments and demonstrations required to support the construction of a high-speed civil transport. The plan includes a compilation of technology issues related to the development of a transport. The issues represent technical areas in which research and development are required to allow airframe manufacturers to pursue an HSCT development. The vast majority of technical issues presented require flight demonstrated and validated solutions before a transport development will be undertaken by the industry. The author believes that NASA is the agency best suited to address flight demonstration issues in a concentrated effort. The new Integrated Test Facility at NASA Dryden Flight Research Facility is considered ideally suited to the task of supporting ground validations of proof-of-concept and prototype system demonstrations before night demonstrations. An elaborate ground hardware-in-the-loop (iron bird) simulation supported in this facility provides a viable alternative to developing an expensive fill-scale prototype transport technology demonstrator. Drygen's SR-71 assets, modified appropriately, are a suitable test-bed for supporting flight demonstrations and validations of certain transport technology solutions. A subscale, manned or unmanned flight demonstrator is suitable for flight validation of transport technology solutions, if appropriate structural similarity relationships can be established. The author contends that developing a full-scale prototype transport technology demonstrator is the best alternative to ensuring that a positive decision to develop a transport is reached by the United States aerospace industry.
NASA Astrophysics Data System (ADS)
Penfold, Scott; Zalas, Rafał; Casiraghi, Margherita; Brooke, Mark; Censor, Yair; Schulte, Reinhard
2017-05-01
A split feasibility formulation for the inverse problem of intensity-modulated radiation therapy treatment planning with dose-volume constraints included in the planning algorithm is presented. It involves a new type of sparsity constraint that enables the inclusion of a percentage-violation constraint in the model problem and its handling by continuous (as opposed to integer) methods. We propose an iterative algorithmic framework for solving such a problem by applying the feasibility-seeking CQ-algorithm of Byrne combined with the automatic relaxation method that uses cyclic projections. Detailed implementation instructions are furnished. Functionality of the algorithm was demonstrated through the creation of an intensity-modulated proton therapy plan for a simple 2D C-shaped geometry and also for a realistic base-of-skull chordoma treatment site. Monte Carlo simulations of proton pencil beams of varying energy were conducted to obtain dose distributions for the 2D test case. A research release of the Pinnacle 3 proton treatment planning system was used to extract pencil beam doses for a clinical base-of-skull chordoma case. In both cases the beamlet doses were calculated to satisfy dose-volume constraints according to our new algorithm. Examination of the dose-volume histograms following inverse planning with our algorithm demonstrated that it performed as intended. The application of our proposed algorithm to dose-volume constraint inverse planning was successfully demonstrated. Comparison with optimized dose distributions from the research release of the Pinnacle 3 treatment planning system showed the algorithm could achieve equivalent or superior results.
Mars Exploration Rover Mission: Entry, Descent, and Landing System Validation
NASA Technical Reports Server (NTRS)
Mitcheltree, Robert A.; Lee, Wayne; Steltzner, Adam; SanMartin, Alejanhdro
2004-01-01
System validation for a Mars entry, descent, and landing system is not simply a demonstration that the electrical system functions in the associated environments. The function of this system is its interaction with the atmospheric and surface environment. Thus, in addition to traditional test-bed, hardware-in-the-loop, testing, a validation program that confirms the environmental interaction is required. Unfortunately, it is not possible to conduct a meaningful end-to-end test of a Mars landing system on Earth. The validation plan must be constructed from an interconnected combination of simulation, analysis and test. For the Mars Exploration Rover mission, this combination of activities and the logic of how they combined to the system's validation was explicitly stated, reviewed, and tracked as part of the development plan.
Regional Traffic Incident Management Programs : Implementation Guide
DOT National Transportation Integrated Search
2012-08-01
This report presents the test plan for conducting the Air Quality Analysis for the United States Department of Transportation (U.S. DOT) evaluation of the Dallas U.S. 75 Integrated Corridor Management (ICM) Initiative Demonstration. The ICM projects ...
Traffic conflict techniques for safety and operations : observers manual
DOT National Transportation Integrated Search
2012-08-01
This report presents the test plan for conducting the Institutional and Organizational Analysis for the United States Department of Transportation (U.S. DOT) evaluation of the San Diego Integrated Corridor Management (ICM) Initiative Demonstration. T...
Educational and technical assistance to CMV drivers and motor carriers
DOT National Transportation Integrated Search
2011-08-01
This report presents the test plan for collecting and analyzing information on outreach activities, media coverage, and establishment of the partnership for the projects comprising the Atlanta Congestion Reduction Demonstration (CRD) under the United...
A toolbox for alleviating traffic congestion and enhancing mobility
DOT National Transportation Integrated Search
2012-06-01
This report presents the Tolling Data Test Plan for the national evaluation of the Los Angeles (LA) Congestion Reduction Demonstration (Metro ExpressLanes) under the United States Department of Transportation (U.S. DOT) Congestion Reduction Demonstra...
Transportation Brokerage Demonstration - Bridgeport, Connecticut.
DOT National Transportation Integrated Search
1984-04-01
Since August 1978, the Greater Bridgeport Transit District (GBTD) has been engaged in a test of multimodal transportation brokerage. It is an ambitious effort aimed at revolutionizing the role of a public transit operator in planning and operating a ...
DOT National Transportation Integrated Search
1997-09-26
Appendices A & B of the "Implementation of the National Intelligent Transportation Systems Program", a report forwarded to Congress according to Section 6054(c) of the Intermodal Surface Transportation Efficiency Act of 1991 (ISTEA).
Northeast Florida rural transit intelligent transportation system (ITS) : evaluation plan
DOT National Transportation Integrated Search
2001-05-01
The Northeast Florida Rural Transportation Intelligent Transportation System (ITS) project is a demonstration of ITS deployment in five rural Community Transportation Coordinator (CTC) agencies. The objective of the project is to test and evaluate th...
Effects of operating practices on commercial driver alertness
DOT National Transportation Integrated Search
2011-08-01
This report presents the test plan for collecting and analyzing data dealing with travel demand management (TDM) activities for the Atlanta Congestion Reduction Demonstration (CRD) under the United States Department of Transportation (U.S. DOT) Urban...
Share the road campaign research study : final report
DOT National Transportation Integrated Search
2012-07-01
This report presents the Environmental Data Test Plan for the national evaluation of the Los Angeles (LA) Congestion Reduction Demonstration (Metro ExpressLanes) under the United States Department of Transportation (U.S. DOT) Congestion Reduction Dem...
NASA Technical Reports Server (NTRS)
Ferlita, F.
1989-01-01
The Advanced Launch Systems (ALS) Advanced Development Oxidizer Turbopump Program has designed, fabricated and demonstrated a low cost, highly reliable oxidizer turbopump for the Space Transportation Engine that minimizes the recurring cost for the ALS engines. Pratt and Whitney's (P and W's) plan for integrating the analyses, testing, fabrication, and other program efforts is addressed. This plan offers a comprehensive description of the total effort required to design, fabricate, and test the ALS oxidizer turbopump. The proposed ALS oxidizer turbopump reduces turbopump costs over current designs by taking advantage of design simplicity and state-of-the-art materials and producibility features without compromising system reliability. This is accomplished by selecting turbopump operating conditions that are within known successful operating regions and by using proven manufacturing techniques.
Mercury Ion Clock for a NASA Technology Demonstration Mission.
Tjoelker, Robert L; Prestage, John D; Burt, Eric A; Chen, Pin; Chong, Yong J; Chung, Sang K; Diener, William; Ely, Todd; Enzer, Daphna G; Mojaradi, Hadi; Okino, Clay; Pauken, Mike; Robison, David; Swenson, Bradford L; Tucker, Blake; Wang, Rabi
2016-07-01
There are many different atomic frequency standard technologies but only few meet the demanding performance, reliability, size, mass, and power constraints required for space operation. The Jet Propulsion Laboratory is developing a linear ion-trap-based mercury ion clock, referred to as DSAC (Deep-Space Atomic Clock) under NASA's Technology Demonstration Mission program. This clock is expected to provide a new capability with broad application to space-based navigation and science. A one-year flight demonstration is planned as a hosted payload following an early 2017 launch. This first-generation mercury ion clock for space demonstration has a volume, mass, and power of 17 L, 16 kg, and 47 W, respectively, with further reductions planned for follow-on applications. Clock performance with a signal-to-noise ratio (SNR)*Q limited stability of 1.5E-13/τ(1/2) has been observed and a fractional frequency stability of 2E-15 at one day measured (no drift removed). Such a space-based stability enables autonomous timekeeping of with a technology capable of even higher stability, if desired. To date, the demonstration clock has been successfully subjected to mechanical vibration testing at the 14 grms level, thermal-vacuum operation over a range of 42(°)C, and electromagnetic susceptibility tests.
Gordon, Chad R; Murphy, Ryan J; Coon, Devin; Basafa, Ehsan; Otake, Yoshito; Al Rakan, Mohammed; Rada, Erin; Susarla, Srinivas; Susarla, Sriniras; Swanson, Edward; Fishman, Elliot; Santiago, Gabriel; Brandacher, Gerald; Liacouras, Peter; Grant, Gerald; Armand, Mehran
2014-01-01
Facial transplantation represents one of the most complicated scenarios in craniofacial surgery because of skeletal, aesthetic, and dental discrepancies between donor and recipient. However, standard off-the-shelf vendor computer-assisted surgery systems may not provide custom features to mitigate the increased complexity of this particular procedure. We propose to develop a computer-assisted surgery solution customized for preoperative planning, intraoperative navigation including cutting guides, and dynamic, instantaneous feedback of cephalometric measurements/angles as needed for facial transplantation and other related craniomaxillofacial procedures. We developed the Computer-Assisted Planning and Execution (CAPE) workstation to assist with planning and execution of facial transplantation. Preoperative maxillofacial computed tomography (CT) scans were obtained on 4 size-mismatched miniature swine encompassing 2 live face-jaw-teeth transplants. The system was tested in a laboratory setting using plastic models of mismatched swine, after which the system was used in 2 live swine transplants. Postoperative CT imaging was obtained and compared with the preoperative plan and intraoperative measures from the CAPE workstation for both transplants. Plastic model tests familiarized the team with the CAPE workstation and identified several defects in the workflow. Live swine surgeries demonstrated utility of the CAPE system in the operating room, showing submillimeter registration error of 0.6 ± 0.24 mm and promising qualitative comparisons between intraoperative data and postoperative CT imaging. The initial development of the CAPE workstation demonstrated that integration of computer planning and intraoperative navigation for facial transplantation are possible with submillimeter accuracy. This approach can potentially improve preoperative planning, allowing ideal donor-recipient matching despite significant size mismatch, and accurate surgical execution for numerous types of craniofacial and orthognathic surgical procedures.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Yoo, Jun Soo; Choi, Yong Joon
The RELAP-7 code verification and validation activities are ongoing under the code assessment plan proposed in the previous document (INL-EXT-16-40015). Among the list of V&V test problems in the ‘RELAP-7 code V&V RTM (Requirements Traceability Matrix)’, the RELAP-7 7-equation model has been tested with additional demonstration problems and the results of these tests are reported in this document. In this report, we describe the testing process, the test cases that were conducted, and the results of the evaluation.
CSM digital autopilot testing in support of ASTP experiments control requirements
NASA Technical Reports Server (NTRS)
Rue, D. L.
1975-01-01
Results are presented of CSM digital autopilot (DAP) testing. The testing was performed to demonstrate and evaluate control modes which are currently planned or could be considered for use in support of experiments on the ASTP mission. The testing was performed on the Lockheed Guidance, Navigation, and Control System Functional Simulator (GNCFS). This simulator, which was designed to test the Apollo and Skylab DAP control system, has been used extensively and is a proven tool for CSM DAP analysis.
NASA Astrophysics Data System (ADS)
Kasprzyk, J. R.; Reed, P. M.; Characklis, G. W.; Kirsch, B. R.
2010-12-01
This paper proposes and demonstrates a new interactive framework for sensitivity-informed de Novo programming, in which a learning approach to formulating decision problems can confront the deep uncertainty within water management problems. The framework couples global sensitivity analysis using Sobol’ variance decomposition with multiobjective evolutionary algorithms (MOEAs) to generate planning alternatives and test their robustness to new modeling assumptions and scenarios. We explore these issues within the context of a risk-based water supply management problem, where a city seeks the most efficient use of a water market. The case study examines a single city’s water supply in the Lower Rio Grande Valley (LRGV) in Texas, using both a 10-year planning horizon and an extreme single-year drought scenario. The city’s water supply portfolio comprises a volume of permanent rights to reservoir inflows and use of a water market through anticipatory thresholds for acquiring transfers of water through optioning and spot leases. Diagnostic information from the Sobol’ variance decomposition is used to create a sensitivity-informed problem formulation testing different decision variable configurations, with tradeoffs for the formulation solved using a MOEA. Subsequent analysis uses the drought scenario to expose tradeoffs between long-term and short-term planning and illustrate the impact of deeply uncertain assumptions on water availability in droughts. The results demonstrate water supply portfolios’ efficiency, reliability, and utilization of transfers in the water supply market and show how to adaptively improve the value and robustness of our problem formulations by evolving our definition of optimality to discover key tradeoffs.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Farnham, Irene
2016-12-01
This report presents the analytical data for the 2014 fiscal year (FY) and calendar year (CY) (October 1, 2013, through December 31, 2014), and an evaluation of the data to ensure that the Sampling Plan’s objectives are met. In addition to samples collected and analyzed for the Sampling Plan, some NNSS wells are monitored by NNSA/NFO to demonstrate compliance with State-issued water discharge permits; with protection of groundwater from ongoing radiological waste disposal activities (compliance wells); and to demonstrate that the onsite drinking water supply is below SDWA maximum contaminant levels (MCLs) (public water system [PWS] wells). While not allmore » sampled locations are required by the Sampling Plan, these samples are relevant to its objectives and are therefore presented herein for completeness purposes. Special investigations that took place in 2014 that are relevant to the Sampling Plan are also presented. This is the first annual report released to support Sampling Plan implementation.« less
Accelerated testing of space mechanisms
NASA Technical Reports Server (NTRS)
Murray, S. Frank; Heshmat, Hooshang
1995-01-01
This report contains a review of various existing life prediction techniques used for a wide range of space mechanisms. Life prediction techniques utilized in other non-space fields such as turbine engine design are also reviewed for applicability to many space mechanism issues. The development of new concepts on how various tribological processes are involved in the life of the complex mechanisms used for space applications are examined. A 'roadmap' for the complete implementation of a tribological prediction approach for complex mechanical systems including standard procedures for test planning, analytical models for life prediction and experimental verification of the life prediction and accelerated testing techniques are discussed. A plan is presented to demonstrate a method for predicting the life and/or performance of a selected space mechanism mechanical component.
DOT National Transportation Integrated Search
1997-09-19
The term National Intelligent Transportation Infrastructure (NITI) refers to the integrated electronics, communications, and hardware and software elements that can support Intelligent Transportation System (ITS) services and products. NITI is not ju...
Commercial truck driver fatigue, alertness, and countermeasures survey
DOT National Transportation Integrated Search
2011-08-01
This report presents the test plan for collecting and analyzing cost and benefit data for the Atlanta Congestion Reduction Demonstration (CRD) under the United States Department of Transportation (U.S. DOT) Urban Partnership Agreement (UPA) and CRD P...
Development of the North American cargo securement standard
DOT National Transportation Integrated Search
2012-08-01
This report presents the test plan for conducting the Benefit-Cost Analysis (BCA) for the United States Department of Transportation (U.S. DOT) evaluation of the Dallas U.S. 75 Integrated Corridor Management (ICM) Initiative Demonstration. The ICM pr...
46 CFR 62.20-3 - Plans for information.
Code of Federal Regulations, 2011 CFR
2011-10-01
... detected by the crew, alternatives available to the crew, and possible design verification tests necessary... reliability of the design. It should be conducted to a level of detail necessary to demonstrate compliance... at an early stage of design. ...
Intelligent rover decision-making in response to exogenous events
NASA Technical Reports Server (NTRS)
Chouinard, C.; Estlin, T.; Gaines, D.; Fisher, F.
2005-01-01
This paper presents an introduction to the CLEAR system which performs rover command generation and re-planning, the challenges faced maintaining domain specific information in an uncertain environment, and the successes demonstrated with several methods of system testing.
Improvements in Symbol Sign Design To Aid Older Drivers
DOT National Transportation Integrated Search
2012-08-01
This report presents the Traffic System Data Test Plan for the national evaluation of the Los Angeles County Congestion Reduction Demonstration (CRD) under the United States Department of Transportation (U.S. DOT) Urban Partnership Agreement (UPA) Pr...
High Efficiency Low Cost CO2 Compression Using Supersonic Shock Wave Technology
DOE Office of Scientific and Technical Information (OSTI.GOV)
Williams, J; Aarnio, M; Grosvenor, A
2010-12-31
Development and testing results from a supersonic compressor are presented. The compressor achieved record pressure ratio for a fully-supersonic stage and successfully demonstrated the technology potential. Several tasks were performed in compliance with the DOE award objectives. A high-pressure ratio compressor was retrofitted to improve rotordynamics behavior and successfully tested. An outside review panel confirmed test results and design approach. A computational fluid dynamics code used to analyze the Ramgen supersonic flowpath was extensively and successfully modified to improve use on high-performance computing platforms. A comprehensive R&D implementation plan was developed and used to lay the groundwork for a futuremore » full-scale compressor demonstration. Conceptual design for a CO2 demonstration compressor was developed and reviewed.« less
Wong, D; Maybery, M; Bishop, D V M; Maley, A; Hallmayer, J
2006-11-01
Delineation of a cognitive endophenotype for autism is useful both for exploring the genetic mechanisms underlying the disorder and for identifying which cognitive traits may be primary to it. This study investigated whether first-degree relatives of individuals with autism spectrum disorders (ASDs) demonstrate a specific profile of performance on a range of components of executive function (EF), to determine whether EF deficits represent possible endophenotypes for autism. Parents and siblings of ASD and control probands were tested on EF tasks measuring planning, set-shifting, inhibition and generativity. ASD parents showed poorer performance than control parents on a test of ideational fluency or generativity, and ASD fathers demonstrated a weakness in set-shifting to a previously irrelevant dimension. ASD siblings revealed a mild reduction in ideational fluency and a weakness in non-verbal generativity when compared with control siblings. Neither ASD parents nor siblings displayed significant difficulties with planning or inhibition. These results indicated that the broad autism phenotype may not be characterized primarily by impairments in planning and cognitive flexibility, as had been previously proposed. Weaknesses in generativity emerged as stronger potential endophenotypes in this study, suggesting that this aspect of EF should play a central role in cognitive theories of autism. However, discrepancies in the EF profile demonstrated by parents and siblings suggest that factors related to age or parental responsibility may affect the precise pattern of deficits observed.
NASA Technical Reports Server (NTRS)
Littlefield, Alan C.; Melton, Gregory S.
2000-01-01
The X-33 Advanced Technology Demonstrator is an un-piloted, vertical take-off, horizontal landing spacecraft. The purpose of the X-33 program is to demonstrate technologies that will dramatically lower the cost of access to space. The rocket-powered X-33 will reach an altitude of up to 100 km and speeds between Mach 13 and 15. Fifteen flight tests are planned, beginning in 2000. Some of the key technologies demonstrated will be the linear aerospike engine, improved thermal protection systems, composite fuel tanks and reduced operational timelines. The X-33 vehicle umbilical connections provide monitoring, power, cooling, purge, and fueling capability during horizontal processing and vertical launch operations. Two "rise-off" umbilicals for the X-33 have been developed, tested, and installed. The X-33 umbilical systems mechanisms incorporate several unique design features to simplify horizontal operations and provide reliable disconnect during launch.
NASA Technical Reports Server (NTRS)
Littlefield, Alan C.; Melton, Gregory S.
1999-01-01
The X-33 Advanced Technology Demonstrator is an un-piloted, vertical take-off, horizontal landing spacecraft. The purpose of the X-33 program is to demonstrate technologies that will dramatically lower the cost of access to space. The rocket-powered X-33 will reach an altitude of up to 100 km and speeds between Mach 13 and 15. Fifteen flight tests are planned, beginning in 2000. Some of the key technologies demonstrated will be the linear aerospike engine, improved thermal protection systems, composite fuel tanks and reduced operational timelines. The X-33 vehicle umbilical connections provide monitoring, power, cooling, purge, and fueling capability during horizontal processing and vertical launch operations. Two "rise-ofF' umbilicals for the X-33 have been developed, tested, and installed. The X-33 umbilical systems mechanisms incorporate several unique design features to simplify horizontal operations and provide reliable disconnect during launch.
The Integrated Airport: Building a Successful NextGen Testbed
DOE Office of Scientific and Technical Information (OSTI.GOV)
Frederick-Recascino, Christina; Sweigard, Doug; Lester, Wade
2009-02-18
This presentation will describe a unique public-private partnership - the Integrated Airport - that was created to engage in research and testing related to NextGen Technology deployment. NextGen refers to the program that will be initiated to modernize the US National Airspace. As with any major, multi-decade initiative, such as NextGen, integration of work efforts by multiple partners in the modernization is critical for success. This talk will focus on the development of the consortium, how the consortium plans for NextGen initiatives, the series of technology demonstrations we have produced and plans for the future of NextGen testing and implementation.
NASA Technical Reports Server (NTRS)
Young, Roy M.; Montgomery, Edward E.; Montgomery, Sandy; Adams, Charles L.
2007-01-01
The NASA In-Space Propulsion Technology (ISPT) Projects Office has been sponsoring 2 separate, independent system design and development hardware demonstration activities during 2002-2005. ATK Space Systems of Goleta, CA was the prime contractor for one development team and L'Garde, Inc. of Tustin, CA was the prime contractor for the other development team. The goal of these activities was to advance the technology readiness level (TRL) of solar sail propulsion from 3 towards 6 by the year 2006. Component and subsystem fabrication and testing were completed successfully, including the ground deployment of 10-meter and 20-meter ground demonstration hardware systems under vacuum conditions. The deployment and structural testing of the 20-meter solar sail systems was conducted in the 30 meter diameter Space Power Facility thermal-vacuum chamber at NASA Glenn Plum Brook in April though August, 2005. This paper will present the results of the TRL assessment following the solar sail technology development activities associated with the design, development, analysis and testing of the 20-meter system ground demonstrators. Descriptions of the system designs for both the ATK and L'Garde systems will be presented. Changes, additions and evolution of the system designs will be highlighted. A description of the modeling and analyses activities performed by both teams, as well as testing conducted to raise the TRL of solar sail technology will be presented. A summary of the results of model correlation activities will be presented. Finally, technology gaps identified during the assessment and gap closure plans will be presented, along with "lessons learned", subsequent planning activities and validation flight opportunities for solar sail propulsion technology.
Code of Federal Regulations, 2010 CFR
2010-07-01
... compliance date specified in § 63.3883. For magnet wire coating operations you may, with approval, conduct a performance test of one representative magnet wire coating machine for each group of identical or very similar magnet wire coating machines. (2) You must develop and begin implementing the work practice plan required...
ERIC Educational Resources Information Center
Darby, Keith
The overall objective of the Satellite Technology Demonstration (STD) was to test the feasibility of delivering television Programing via satellite to isolated, rural locations. Community members at various STD sites were surveyed to determine how they felt about a variety of topics which were planned for an adult evening series. Topics in…
NASA Technical Reports Server (NTRS)
Scheffler, R. L.
1979-01-01
To demonstrate the concept of utility scale electricity production from a high wind energy resource, a program was initiated to construct and test a 3 megawatt (3,000 kW) Schachle wind turbine generator near Palm Springs, California. The background and current status of this program are presented along with a summary of future planned program activities.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Smith, Brennan T.; Welch, Tim; Witt, Adam M.
The Multi-Year Plan for Research, Development, and Prototype Testing of Standard Modular Hydropower Technology (MYRP) presents a strategy for specifying, designing, testing, and demonstrating the efficacy of standard modular hydropower (SMH) as an environmentally compatible and cost-optimized renewable electricity generation technology. The MYRP provides the context, background, and vision for testing the SMH hypothesis: if standardization, modularity, and preservation of stream functionality become essential and fully realized features of hydropower technology, project design, and regulatory processes, they will enable previously unrealized levels of new project development with increased acceptance, reduced costs, increased predictability of outcomes, and increased value to stakeholders.more » To achieve success in this effort, the MYRP outlines a framework of stakeholder-validated criteria, models, design tools, testing facilities, and assessment protocols that will facilitate the development of next-generation hydropower technologies.« less
DOT National Transportation Integrated Search
2001-01-01
Internet-based Advanced Traveler Information Services (ATIS) provide the urban traveler with estimated travel times based on current roadway congestion. Survey research indicates that the vast majority of current ATIS users are satisfied consumers wh...
75 FR 42760 - Statement of Organization, Functions, and Delegations of Authority
Federal Register 2010, 2011, 2012, 2013, 2014
2010-07-22
... accounting reports and invoices, and monitoring all spending. The Team develops, defends and executes the... results; performance measurement; research and evaluation methodologies; demonstration testing and model... ACF programs; strategic planning; performance measurement; program and policy evaluation; research and...
Proof of concept deployment plan.
DOT National Transportation Integrated Search
2008-02-01
The U.S. Department of Transportation (USDOT) Next Generation 9-1-1 (NG9-1-1) : Proof-of-Concept (POC) demonstration is envisioned to test key features and : functionalities of the NG9-1-1 system. The Interim POC System Design Document : defines the ...
DOT National Transportation Integrated Search
1999-07-01
This document presents human factors guidelines for designers, owners operators, and planners involved in the development and operation of traffic management centers. Dimensions of the work environment affecting operator and system performance are ad...
DOT National Transportation Integrated Search
1997-10-01
With the growing reliance on information systems within the global economy, it has become necessary to protect the availability, integrity, and confidentiality of information. As the surface transportation industry enters the information era through ...
Properties important to mixing and simulant recommendations for WTP full-scale vessel testing
DOE Office of Scientific and Technical Information (OSTI.GOV)
Poirier, M. R.; Martino, C. J.
2015-12-01
Full Scale Vessel Testing (FSVT) is being planned by Bechtel National, Inc., to demonstrate the ability of the standard high solids vessel design (SHSVD) to meet mixing requirements over the range of fluid properties planned for processing in the Pretreatment Facility (PTF) of the Hanford Waste Treatment and Immobilization Plant (WTP). Testing will use simulated waste rather than actual Hanford waste. Therefore, the use of suitable simulants is critical to achieving the goals of the test program. WTP personnel requested the Savannah River National Laboratory (SRNL) to assist with development of simulants for use in FSVT. Among the tasks assignedmore » to SRNL was to develop a list of waste properties that are important to pulse-jet mixer (PJM) performance in WTP vessels with elevated concentrations of solids.« less
Dean, Marleah; Rauscher, Emily A
2017-12-01
Women who test positive for a BRCA genetic mutation are at an increased risk for developing hereditary breast and ovarian cancer and have a 50% chance of passing on their genetic mutation to their children. The purpose of this study was to investigate how women who test positive for a BRCA mutation but have not been diagnosed with cancer make decisions regarding family planning. Analysis of interviews with 20 women revealed they engage in logical and emotional decision-making styles. Although women want to be logical to reduce their hereditary cancer risk, emotions often complicate their decision-making. Women experience fear and worry about a future cancer diagnosis, yet also desire to create a family, particularly having children through natural conception. That is, women negotiate having preventative surgeries in a logical doctor-recommended timeframe but also organize those decisions around emotional desires of motherhood. Overall, this study demonstrates the complex decisions women who test positive for a BRCA mutation must make in regards to genetic testing timing, family planning, and overall quality of life.
Design and implementation of a compliant robot with force feedback and strategy planning software
NASA Technical Reports Server (NTRS)
Premack, T.; Strempek, F. M.; Solis, L. A.; Brodd, S. S.; Cutler, E. P.; Purves, L. R.
1984-01-01
Force-feedback robotics techniques are being developed for automated precision assembly and servicing of NASA space flight equipment. Design and implementation of a prototype robot which provides compliance and monitors forces is in progress. Computer software to specify assembly steps and makes force feedback adjustments during assembly are coded and tested for three generically different precision mating problems. A model program demonstrates that a suitably autonomous robot can plan its own strategy.
Satellite Communications for Aeronautics Applications: Technology Development and Demonstration
NASA Technical Reports Server (NTRS)
Kerczewski, Robert J.; Hoder, Douglas J.; Zakrajsek, Robert J.
2001-01-01
The National Aeronautics and Space Administration (NASA) is performing research and development to improve the safety and increase the capacity of the National Airspace System (NAS). Improved communications, especially to and from the aircraft flight deck, has been identified as an essential enabling technology for future improvements to the air traffic management system and aviation safety. NASA's Glenn Research Center is engaged in research and development of satellite communications technologies for aeronautical applications. A mobile aero terminal has been developed for use with Ku band commercial communications satellites. This experimental terminal will be used in mobile ground and air-based tests and demonstrations during 2000-2004. This paper will describe the basic operational parameters of the Ku Band aero terminal, the communications architecture it is intended to demonstrate, and the key technology issues being addressed in the tests and demonstrations. The design of the Ku Band aero terminal and associated ground testbed, planned tests and demonstrations, and results to date will be presented.
Potential roles for EVA and telerobotics in a unified worksite
NASA Astrophysics Data System (ADS)
Akin, David; Howard, Russel D.
1993-02-01
Although telerobotics and extravehicular activity (EVA) are often portrayed as competitive approaches to space operations, ongoing research in the Space Systems Laboratory (SSL) has demonstrated the utility of cooperative roles in an integrated EVA/telerobotic work site. Working in the neutral buoyancy simulation environment, tests were performed on interactive roles or EVA subjects and telerobots in structural assembly and satellite servicing tasks. In the most elaborate of these tests to date, EVA subjects were assisted by the SSL's Beam Assembly Teleoperator (BAT) in several servicing tasks planned for Hubble Space Telescope, using the high-fidelity crew training article in the NASA Marshall Neutral Buoyancy Simulator. These tests revealed several shortcomings in the design of BAT for satellite servicing and demonstrated the utility of a free-flying or RMS-mounted telerobot for providing EVA crew assistance. This paper documents the past tests, including the use of free-flying telerobots to effect the rescue of a simulated incapacitated EVA subject, and details planned future efforts in this area, including the testing of a new telerobotic system optimized for the satellite servicing role, the development of dedicated telerobotic devices designed specifically for assisting EVA crew, and conceptual approaches to advanced EVA/telerobotic operations such as the Astronaut Operations Vehicle.
NASA Technical Reports Server (NTRS)
Thome, Kurtis; McCorkel, Joel; Hair, Jason; McAndrew, Brendan; Daw, Adrian; Jennings, Donald; Rabin, Douglas
2012-01-01
The Climate Absolute Radiance and Refractivity Observatory (CLARREO) mission addresses the need to observe high-accuracy, long-term climate change trends and to use decadal change observations as the most critical method to determine the accuracy of climate change. One of the major objectives of CLARREO is to advance the accuracy of SI traceable absolute calibration at infrared and reflected solar wavelengths. This advance is required to reach the on-orbit absolute accuracy required to allow climate change observations to survive data gaps while remaining sufficiently accurate to observe climate change to within the uncertainty of the limit of natural variability. While these capabilities exist at NIST in the laboratory, there is a need to demonstrate that it can move successfully from NIST to NASA and/or instrument vendor capabilities for future spaceborne instruments. The current work describes the test plan for the Solar, Lunar for Absolute Reflectance Imaging Spectroradiometer (SOLARIS) which is the calibration demonstration system (CDS) for the reflected solar portion of CLARREO. The goal of the CDS is to allow the testing and evaluation of calibration approaches , alternate design and/or implementation approaches and components for the CLARREO mission. SOLARIS also provides a test-bed for detector technologies, non-linearity determination and uncertainties, and application of future technology developments and suggested spacecraft instrument design modifications. The end result of efforts with the SOLARIS CDS will be an SI-traceable error budget for reflectance retrieval using solar irradiance as a reference and methods for laboratory-based, absolute calibration suitable for climate-quality data collections. The CLARREO mission addresses the need to observe high-accuracy, long-term climate change trends and advance the accuracy of SI traceable absolute calibration. The current work describes the test plan for the SOLARIS which is the calibration demonstration system for the reflected solar portion of CLARREO. SOLARIS provides a test-bed for detector technologies, non-linearity determination and uncertainties, and application of future technology developments and suggested spacecraft instrument design modifications. The end result will be an SI-traceable error budget for reflectance retrieval using solar irradiance as a reference and methods for laboratory-based, absolute calibration suitable for climate-quality data collections.
Project W-320 acceptance test report for AY-farm electrical distribution
DOE Office of Scientific and Technical Information (OSTI.GOV)
Bevins, R.R.
1998-04-02
This Acceptance Test Procedure (ATP) has been prepared to demonstrate that the AY-Farm Electrical Distribution System functions as required by the design criteria. This test is divided into three parts to support the planned construction schedule; Section 8 tests Mini-Power Pane AY102-PPI and the EES; Section 9 tests the SSS support systems; Section 10 tests the SSS and the Multi-Pak Group Control Panel. This test does not include the operation of end-use components (loads) supplied from the distribution system. Tests of the end-use components (loads) will be performed by other W-320 ATPs.
Phase II test plan for the evaluation of the performance of container filling systems
DOE Office of Scientific and Technical Information (OSTI.GOV)
BOGER, R.M.
The PHMC will provide tank wastes for final treatment by BNFL from Hanford's waste tanks. Concerns about the ability for ''grab'' sampling to provide large volumes of representative waste samples has led to the development of a nested, fixed-depth sampling system. Preferred concepts for filling sample containers that meet RCRA organic sample criteria were identified by a PHMC Decision Board. These systems will replace the needle based sampling ''T'' that is currently on the sampling system. This test plan document identifies cold tests with simulants that will demonstrate the preferred bottle filling concepts abilities to provide representative waste samples andmore » will meet RCRA criteria. Additional tests are identified that evaluate the potential for cross-contamination between samples and the ability for the system to decontaminate surfaces which have contacted tank wastes. These tests will be performed with kaolid/water and sand/water slurry simulants in the test rig that was used by AEAT to complete Phase 1 tests in FY 1999.« less
Supersonic dynamic stability characteristics of the test technique demonstrator NASP configuration
NASA Technical Reports Server (NTRS)
Dress, David A.; Boyden, Richmond P.; Cruz, Christopher I.
1992-01-01
Wind tunnel tests of a National Aero-Space Plane (NASP) configuration were conducted in both test sections of the Langley Unitary Plan Wind Tunnel. The model used is a Langley designed blended body NASP configuration. Dynamic stability characteristics were measured on this configuration at Mach numbers of 2.0, 2.5, 3.5, and 4.5. In addition to tests of the baseline configuration, component buildup tests were conducted. The test results show that the baseline configuration generally has positive damping about all three axes with only isolated exceptions. In addition, there was generally good agreement between the in-pulse dynamic parameters and the corresponding static data which were measured during another series of tests in the Unitary Plan Wind Tunnel. Also included are comparisons of the experimental damping parameters with results from the engineering predictive code APAS (Aerodynamic Preliminary Analysis System). These comparisons show good agreement at low angles of attack; however, the comparisons are generally not as good at the higher angles of attack.
Integrated test plan for directional boring
DOE Office of Scientific and Technical Information (OSTI.GOV)
Volk, B.W.
This integrated test plan describes the field testing of the DITCH WITCH Directional Boring System. DITCH WITCH is a registered trademark of The Charles Machine Works, Inc., Perry, Oklahoma. The test is being conducted as a coordinated effort between Charles Machine Works (CMW), Sandia National Laboratories (SNL), and the Westinghouse Hanford Company (WHC). Funding for the WHC portion of the project is through the Volatile Organic Compound-Arid Integrated Demonstration (VOC-Arid ID). The purpose of the test is to evaluate the performance of the directional boring system for possible future use on environmental restoration projects at Hanford and other Department ofmore » Energy (DOE) sites. The test will be conducted near the 200 Areas Fire Station located between the 200 East and 200 West Area of the Hanford Site. The directional boring system will be used to drill and complete (with fiberglass casing) two horizontal boreholes. A third borehole will be drilled to test sampling equipment but will not be completed with casing.« less
Pretreatment Engineering Platform Phase 1 Final Test Report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Kurath, Dean E.; Hanson, Brady D.; Minette, Michael J.
2009-12-23
Pacific Northwest National Laboratory (PNNL) was tasked by Bechtel National Inc. (BNI) on the River Protection Project, Hanford Tank Waste Treatment and Immobilization Plant (RPP-WTP) project to conduct testing to demonstrate the performance of the WTP Pretreatment Facility (PTF) leaching and ultrafiltration processes at an engineering-scale. In addition to the demonstration, the testing was to address specific technical issues identified in Issue Response Plan for Implementation of External Flowsheet Review Team (EFRT) Recommendations - M12, Undemonstrated Leaching Processes.( ) Testing was conducted in a 1/4.5-scale mock-up of the PTF ultrafiltration system, the Pretreatment Engineering Platform (PEP). Parallel laboratory testing wasmore » conducted in various PNNL laboratories to allow direct comparison of process performance at an engineering-scale and a laboratory-scale. This report presents and discusses the results of those tests.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Létourneau, Daniel, E-mail: daniel.letourneau@rmp.uh.on.ca; Department of Radiation Oncology, University of Toronto, Toronto, Ontario; McNiven, Andrea
2013-05-01
Purpose: The objective of this work was to develop a collaborative quality assurance (CQA) program to assess the performance of intensity modulated radiation therapy (IMRT) planning and delivery across the province of Ontario, Canada. Methods and Materials: The CQA program was designed to be a comprehensive end-to-end test that can be completed on multiple planning and delivery platforms. The first year of the program included a head-and-neck (H and N) planning exercise and on-site visit to acquire dosimetric measurements to assess planning and delivery performance. A single dosimeter was used at each institution, and the planned to measured dose agreementmore » was evaluated for both the H and N plan and a standard plan (linear-accelerator specific) that was created to enable a direct comparison between centers with similar infrastructure. Results: CQA program feasibility was demonstrated through participation of all 13 radiation therapy centers in the province. Planning and delivery was completed on a variety of infrastructure (treatment planning systems and linear accelerators). The planning exercise was completed using both static gantry and rotational IMRT, and planned-to-delivered dose agreement (pass rates) for 3%/3-mm gamma evaluation were greater than 90% (92.6%-99.6%). Conclusions: All centers had acceptable results, but variation in planned to delivered dose agreement for the same planning and delivery platform was noted. The upper end of the range will provide an achievable target for other centers through continued quality improvement, aided by feedback provided by the program through the use of standard plans and simple test fields.« less
Design of an ITS-Level advanced traffic management system: a human factors perspective
DOT National Transportation Integrated Search
2012-07-01
This report presents the Ridesharing Data Test Plan for the national evaluation of the Los Angeles (L.A.) County Congestion Reduction Demonstration (CRD) under the United States Department of Transportation (U.S. DOT) Urban Partnership Agreement (UPA...
DOT National Transportation Integrated Search
2000-10-01
The Phoenix, Arizona Metropolitan Model Deployment was one of four cities included in the Metropolitan Model Deployment Initiative (MMDI). The initiative was set forth in 1996 to serve as model deployments of ITS infrastructure and integration. One o...
DOT National Transportation Integrated Search
1997-09-26
This report is forwarded to Congress according to Section 6054(c) of the Intermodal Surface Transportation Efficiency Act of 1991 (ISTEA). Specifically, this report: (1) Presents the goals and accomplishments of the ITS Program, which supports the de...
DOT National Transportation Integrated Search
1999-12-01
The Traceability document consists of brief introductory material and a series of appended Trace Tables. These tables provide complete traceability of ITS User Service Requirements (USR) to elements of the National ITS Architecture. Additional Trace ...
DOT National Transportation Integrated Search
2012-08-01
This report presents the test plan for conducting the Traveler Response Analysis for the United States Department of Transportation (U.S. DOT) evaluation of the Dallas U.S. 75 Integrated Corridor Management (ICM) Initiative Demonstration. The ICM pro...
DOT National Transportation Integrated Search
2002-04-01
The Theory of Operations document is one of a series of deliverables documenting the National Intelligent Transportation System (ITS) Architecture developed under contract to the U.S. Department of Transportation (DOT). The Theory of Operations Docum...
DOT National Transportation Integrated Search
1997-10-01
The Federal Highway Administration (FHWA) commissioned this study to determine whether there are commercial vehicle fleet management needs that can be met through public sector involvement in the development of Intelligent Transportation Systems (ITS...
Atlanta congestion reduction demonstration. National evaluation : cost benefit analysis test plan.
DOT National Transportation Integrated Search
2001-01-01
Initiatives to evaluate the impact of Advanced Traveler Information Services (ATIS) over the last ten years have returned what appears to be contradictory results with respect to the time savings of ATIS users: large perceived time savings reported b...
Eye-activity measures of fatigue and napping as a fatigue countermeasure : tech brief.
DOT National Transportation Integrated Search
2011-08-01
This report presents the test plan for collecting and analyzing safety data for the Atlanta Congestion Reduction Demonstration (CRD) under the United States Department of Transportation (U.S. DOT) Urban Partnership Agreement (UPA) and CRD Programs. T...
Test plan : Branson TRIP travel time/data accuracy
DOT National Transportation Integrated Search
2000-04-01
In the mid 1990's the FHWA established a High Performance Concrete (HPC) program aimed at demonstrating the positive effects of utilizing HPC in bridges. Research on the benefits of using high performance concrete for bridges has shown a number of be...
Automated Bus Diagnostic System Demonstration in New York City
DOT National Transportation Integrated Search
1983-12-01
In response to a growing problem with the quality and efficiency of nationwide bus maintenance practices, an award was granted to the Tri-State Regional Planning Commission for the testing of an automated bus diagnostic system (ABDS). The ABDS was de...
DOT National Transportation Integrated Search
1998-11-01
The purpose of this working paper is to present estimates of potential safety benefits resulting from full implementation of Intelligent Transportation Systems (ITS) in the United States. These estimates were derived by integrating results from a num...
DOT National Transportation Integrated Search
1997-10-01
The ITS infrastructure allows the surface transportation system to be managed as a seamless, intermodal, multi-jurisdictional entity, and appears to the public as a seamless system. It does so by integrating transportation and management information ...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Zakjevskii, V; Knill, C; Rakowski, J
2014-06-01
Purpose: To develop a comprehensive end-to-end test for Varian's TrueBeam linear accelerator for head and neck IMRT using a custom phantom designed to utilize multiple dosimetry devices. Methods: The initial end-to-end test and custom H and N phantom were designed to yield maximum information in anatomical regions significant to H and N plans with respect to: i) geometric accuracy, ii) dosimetric accuracy, and iii) treatment reproducibility. The phantom was designed in collaboration with Integrated Medical Technologies. A CT image was taken with a 1mm slice thickness. The CT was imported into Varian's Eclipse treatment planning system, where OARs and themore » PTV were contoured. A clinical template was used to create an eight field static gantry angle IMRT plan. After optimization, dose was calculated using the Analytic Anisotropic Algorithm with inhomogeneity correction. Plans were delivered with a TrueBeam equipped with a high definition MLC. Preliminary end-to-end results were measured using film and ion chambers. Ion chamber dose measurements were compared to the TPS. Films were analyzed with FilmQAPro using composite gamma index. Results: Film analysis for the initial end-to-end plan with a geometrically simple PTV showed average gamma pass rates >99% with a passing criterion of 3% / 3mm. Film analysis of a plan with a more realistic, ie. complex, PTV yielded pass rates >99% in clinically important regions containing the PTV, spinal cord and parotid glands. Ion chamber measurements were on average within 1.21% of calculated dose for both plans. Conclusion: trials have demonstrated that our end-to-end testing methods provide baseline values for the dosimetric and geometric accuracy of Varian's TrueBeam system.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Anast, Kurt Roy; Funk, David John; Hargis, Kenneth Marshall
The inadvertent creation of transuranic waste carrying hazardous waste codes D001 and D002 requires the treatment of the material to eliminate the hazardous characteristics and allow its eventual shipment and disposal at the Waste Isolation Pilot Plant (WIPP). This report documents the effectiveness of two treatment methods proposed to stabilize both the unremediated and remediated nitrate salt waste streams (UNS and RNS, respectively) at Los Alamos National Laboratory (LANL). The two technologies include the addition of zeolite (with and without the addition of water as a processing aid) and cementation. Surrogates were developed to evaluate both the solid and liquidmore » fractions expected from parent waste containers, and both the solid and liquid fractions were tested. Both technologies are shown to be effective at eliminating the characteristic of ignitability (D001), and the addition of zeolite was determined to be effective at eliminating corrosivity (D002), with the preferred option1 of adding zeolite currently planned for implementation at LANL’s Waste Characterization, Reduction, and Repackaging Facility (WCRRF). The course of this work verified the need to evaluate and demonstrate the effectiveness of the proposed remedy for debris material, if required. The evaluation determined that WypAlls, cheesecloth, and Celotex absorbed with saturated nitrate salt solutions exhibit the ignitability characteristic (all other expected debris is not classified as ignitable). Finally, liquid surrogates containing saturated nitrate salts did not exhibit the characteristic of ignitability in their pure form (those neutralized with Kolorsafe and mixed with sWheat did exhibit D001). Sensitivity testing and an analysis were conducted to evaluate the waste form for reactivity. Tests included subjecting surrogate material to mechanical impact, friction, electrostatic discharge and thermal insults. The testing confirmed that the waste does not exhibit the characteristic of reactivity (D003). Follow-on testing was conducted to demonstrate the effectiveness of zeolite stabilization for ignitable WypAll and cheesecloth debris and additional nitrate salt solutions (those exhibiting the oxidizer characteristic) to demonstrate the effectiveness of the remedy. Follow-on testing also included testing of surrogate materials containing Waste Lock 770, which is present in four of the RNS containers, and potential items of debris such as plywood and Celotex material. Testing to evaluate the effectiveness of the remedy was performed using the specific remediation processes that are planned for use at the WCRRF. Finally, testing was also performed to evaluate the holding capacity of zeolite using a highly acidic surrogate solution and to characterize the composition of gases generated during mixing of zeolite with surrogate solutions. All these tests demonstrated the effectiveness of adding zeolite as the planned remedy.« less
NASA Technical Reports Server (NTRS)
Hogenson, P. A.; Lu, Tina
1995-01-01
The objective is to develop the advanced thermal seals to a technology readiness level (TRL) of 6 to support the rapid turnaround time and low maintenance requirements of the X-33 and the future reusable launch vehicle (RLV). This program is divided into three subtasks: (1) orbiter thermal seals operation history review; (2) material, process, and design improvement; and (3) fabrication and evaluation of the advanced thermal seals.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Ainsworth, Calvin C.
The 100-N Area Innovative Treatment and Remediation Demonstration (ITRD) identified phyto¬remediation as a potential technology both for the removal of 90Sr from the soil of the riparian zone and as a filter for groundwater along the Columbia River. Recent greenhouse and growth chamber studies have demonstrated the viability of phytoextraction to remove 90Sr from this area’s soil/water; in conjunction with monitored natural attenuation and an apatite barrier the process would make an effective treatment for remediation of the 100-N Area 90Sr plume. All activities associated with the 100-NR-1 and 100-NR-2 Operable Units of the Hanford 100-N Area have had, andmore » continue to have, significant regulatory and stakeholder participation. Beginning in 1998 with the ITRD process, presentations to the ITRD TAG were heavily attended by EPA, Washington State Department of Ecology, and stakeholders. In addition, three workshops have been held to receive regulatory and stakeholder feedback on monitored natural attenuation, the apatite barrier, and phytoremediation; these were held in Richland in August 2003, December 2004, and August 2005. The apatite injection treatability test plan (DOE 2005) describes phytoremediation as a technology to be evaluated during the March 2008 evaluation milestone as described in the Tri-Party Agreement change request (M-16-06-01 Change Control Form). If, during this evaluation milestone, phytoremediation is favorably evaluated it would be incorporated into the treatability test plan. The phytoremediation treatability test described in this proposal is strongly supported by the Washington State Department of Ecology.« less
Synthetic Vision Technology Demonstration. Volume 4. Appendices
1993-12-01
Synthetic Vision System and where advanced miaoebaro. tehnology would make signditcan oiprovements in capgwy or poduction cost. 2-6 SVSTDISIED Program Plan...achievement. 4. Determination of the pilot (test subject) mix and the test repetition needed to assure reasonable confidence In the results. 5...will contain the following elements: 1. Description - statement of what is to be accomplished. 2. Initial Conditions - items which must be accomplished
Supersonic Retropropulsion Flight Test Concepts
NASA Technical Reports Server (NTRS)
Post, Ethan A.; Dupzyk, Ian C.; Korzun, Ashley M.; Dyakonov, Artem A.; Tanimoto, Rebekah L.; Edquist, Karl T.
2011-01-01
NASA's Exploration Technology Development and Demonstration Program has proposed plans for a series of three sub-scale flight tests at Earth for supersonic retropropulsion, a candidate decelerator technology for future, high-mass Mars missions. The first flight test in this series is intended to be a proof-of-concept test, demonstrating successful initiation and operation of supersonic retropropulsion at conditions that replicate the relevant physics of the aerodynamic-propulsive interactions expected in flight. Five sub-scale flight test article concepts, each designed for launch on sounding rockets, have been developed in consideration of this proof-of-concept flight test. Commercial, off-the-shelf components are utilized as much as possible in each concept. The design merits of the concepts are compared along with their predicted performance for a baseline trajectory. The results of a packaging study and performance-based trade studies indicate that a sounding rocket is a viable launch platform for this proof-of-concept test of supersonic retropropulsion.
Improving the primary school science learning unit about force and motion through lesson study
NASA Astrophysics Data System (ADS)
Phaikhumnam, Wuttichai; Yuenyong, Chokchai
2018-01-01
The study aimed to develop primary school science lesson plan based on inquiry cycle (5Es) through lesson study. The study focused on the development of 4 primary school science lesson plans of force and motion for Grade 3 students in KKU Demonstration Primary School (Suksasart), first semester of 2015 academic year. The methodology is mixed method. The Inthaprasitha (2010) lesson study cycle was implemented in group of KKU Demonstration Primary School. Instruments of reflection of lesson plan developing included participant observation, meeting and reflection report, lesson plan and other document. The instruments of examining students' learning include classroom observation and achievement test. Data was categorized from these instruments to find the issues of changing and improving the good lesson plan of Thai primary school science learning. The findings revealed that teachers could develop the lesson plans through lesson study. The issues of changing and improving were disused by considering on engaging students related to societal issues, students' prior knowledge, scientific concepts for primary school students, and what they learned from their changing. It indicated that the Lesson Study allowed primary school science teachers to share ideas and develop ideas to improve the lesson. The study may have implications for Thai science teacher education through Lesson Study.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Park, S; Quon, H; McNutt, T
2016-06-15
Purpose: To determine if the accumulated parotid dosimetry using planning CT to daily CBCT deformation and dose re-calculation can predict for radiation-induced xerostomia. Methods: To track and dosimetrically account for the effects of anatomical changes on the parotid glands, we propagated physicians’ contours from planning CT to daily CBCT using a deformable registration with iterative CBCT intensity correction. A surface mesh for each OAR was created with the deformation applied to the mesh to obtain the deformed parotid volumes. Daily dose was computed on the deformed CT and accumulated to the last fraction. For both the accumulated and the plannedmore » parotid dosimetry, we tested the prediction power of different dosimetric parameters including D90, D50, D10, mean, standard deviation, min/max dose to the combined parotids and patient age to severe xerostomia (NCI-CTCAE grade≥2 at 6 mo follow-up). We also tested the dosimetry to parotid sub-volumes. Three classification algorithms, random tree, support vector machine, and logistic regression were tested to predict severe xerostomia using a leave-one-out validation approach. Results: We tested our prediction model on 35 HN IMRT cases. Parameters from the accumulated dosimetry model demonstrated an 89% accuracy for predicting severe xerostomia. Compared to the planning dosimetry, the accumulated dose consistently demonstrated higher prediction power with all three classification algorithms, including 11%, 5% and 30% higher accuracy, sensitivity and specificity, respectively. Geometric division of the combined parotid glands into superior-inferior regions demonstrated ∼5% increased accuracy than the whole volume. The most influential ranked features include age, mean accumulated dose of the submandibular glands and the accumulated D90 of the superior parotid glands. Conclusion: We demonstrated that the accumulated parotid dosimetry using CT-CBCT registration and dose re-calculation more accurately predicts for severe xerostomia and that the superior portion of the parotid glands may be particularly important in predicting for severe xerostomia. This work was supported in part by NIH/NCI under grant R42CA137886 and in part by Toshiba big data research project funds.« less
Deep Borehole Field Test Conceptual Design Report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hardin, Ernest L.
This report documents conceptual design development for the Deep Borehole Field Test (DBFT), including test packages (simulated waste packages, not containing waste) and a system for demonstrating emplacement and retrieval of those packages in the planned Field Test Borehole (FTB). For the DBFT to have demonstration value, it must be based on conceptualization of a deep borehole disposal (DBD) system. This document therefore identifies key options for a DBD system, describes an updated reference DBD concept, and derives a recommended concept for the DBFT demonstration. The objective of the DBFT is to confirm the safety and feasibility of the DBDmore » concept for long-term isolation of radioactive waste. The conceptual design described in this report will demonstrate equipment and operations for safe waste handling and downhole emplacement of test packages, while contributing to an evaluation of the overall safety and practicality of the DBD concept. The DBFT also includes drilling and downhole characterization investigations that are described elsewhere (see Section 1). Importantly, no radioactive waste will be used in the DBFT, nor will the DBFT site be used for disposal of any type of waste. The foremost performance objective for conduct of the DBFT is to demonstrate safe operations in all aspects of the test.« less
ERIC Educational Resources Information Center
Pennsylvania State Univ., University Park. Center for the Study of Higher Education.
A 2-year pilot demonstration project was undertaken in two U.S. regions to clarify the concept of regionalism and its application to postsecondary education. This concept was tested in two natural planning and service regions that were artificially divided by state boundary lines: The Upper Allegheny Region II (New York and Pennsylvania) and the…
Notional Airspace Operations Demonstration Plan
NASA Technical Reports Server (NTRS)
Trongale, Nicholas A.
2006-01-01
The airspace operations demonstration (AOD) is intended to show that the Access 5 Step 1 functional requirements can be met. The demonstration will occur in two phases. The initial on-range phase will be carried out in restricted airspace to demonstrate the cooperative collision avoidance (CCA) functional requirements and to provide risk-reduction for the AOD by allowing the test team to rehearse some elements of the demonstration mission. The CCA system to be used in these flights is based on Automatic Dependent Surveillance-Broadcast (ADS-B) which is a commercially-available system by which airplanes constantly broadcast their current position and altitude to other aircraft and ground resources over a dedicated radio datalink. The final phase will occur in the national airspace (NAS) and will be the formal demonstration of the remainder of the proposed functional requirements. The general objectives of the AOD are as follows: (1) Demonstrate that the UAS can aviate in the NAS (2) Demonstrate that the UAS can navigate in the NAS (3) Demonstrate that the UAS can communicate with the NAS (4) Demonstrate that the UAS can perform selected collision avoidance functions in the NAS (5) Demonstrate that the UAS can evaluate and avoid weather conflicts in the NAS (6) Demonstrate that the UAS can provide adequate command and control in the NAS In addition to the stated objectives, there are a number of goals for the flight demonstration. The demo can be accomplished successfully without achieving these goals, but these goals are to be used as a guideline for preparing for the mission. The goals are: (1) Mission duration of at least 24 hours (2) Loiter over heavy traffic to evaluate the data block issue identified during the Access 5 Airspace Operations Simulations (3) Document the contingency management process and lessons learned (4) Document the coordination process for Ground Control Stations (GCS) handoff (5) Document lessons learned regarding the process of flying in the NAS Preliminary planning for a notional mission to achieve the objectives and goals has been prepared. The planning is intended to serve as a guide for detailed planning of the AOD.
The Integrated Airport: Building a Successful NextGen Testbed
Frederick-Recascino, Christina; Sweigard, Doug; Lester, Wade
2018-01-24
This presentation will describe a unique public-private partnership - the Integrated Airport - that was created to engage in research and testing related to NextGen Technology deployment. NextGen refers to the program that will be initiated to modernize the US National Airspace. As with any major, multi-decade initiative, such as NextGen, integration of work efforts by multiple partners in the modernization is critical for success. This talk will focus on the development of the consortium, how the consortium plans for NextGen initiatives, the series of technology demonstrations we have produced and plans for the future of NextGen testing and implementation.Â
DOT National Transportation Integrated Search
2016-07-01
The Tampa Hillsborough Expressway Authority (THEA) Connected Vehicle (CV) Pilot Deployment Program is part of a national effort to advance CV technologies by deploying, demonstrating, testing and offering lessons learned for future deployers. The THE...
DOT National Transportation Integrated Search
2000-12-01
The focus of this paper is on advanced public transportation systems (APTS) technologies. It assesses the extent of their deployment and judges their degree of success. It covers APTS technologies in use only by bus and demand responsive service oper...
DOT National Transportation Integrated Search
2003-03-01
In March of 2001, the Federal Highway Administration (FHWA), in conjunction with the Federal Transit Administration (FTA), engaged Gannett Fleming, Inc., to develop the first ever Tunnel Management System to benefit both highway and rail transit tunn...
DOT National Transportation Integrated Search
2012-07-01
This report presents the Cost Benefit Analysis Test Plan for the national evaluation of the Los Angeles County Congestion Reduction Demonstration (LAC CRD) under the United States Department of Transportation (U.S. DOT) Congestion Reduction Demonstra...
DOT National Transportation Integrated Search
2012-08-01
This report presents the test plan for conducting the Technical Capability Analysis for the United States Department of Transportation (U.S. DOT) evaluation of the San Diego Integrated Corridor Management (ICM) Initiative Demonstration. The ICM proje...
DOT National Transportation Integrated Search
1997-01-01
This document reports on the formal evaluation of the targeted (limited but highly focused) deployment of the Advanced Driver and Vehicle Advisory Navigation ConcEpt (ADVANCE), an in-vehicle advanced traveler information system designed to provide sh...
DOT National Transportation Integrated Search
1998-11-01
This flyer summarizes the identified human factors research needs for integrated in-vehicle systems for transit vehicles, one of five configurations of in-vehicle safety and driver information systems. A complete review of the research needs for all ...
The impact of disasters on small business disaster planning: a case study.
Flynn, David T
2007-12-01
A major flood in 1997 forced the evacuation of Grand Forks, North Dakota and caused damage of USD 1 billion. Despite this recent disaster there is only marginal evidence of an increase in disaster recovery planning by businesses that experienced the flood. This finding is consistent with the results of other business-related disaster research. Statistical tests of survey results from 2003 indicate that there is a significantly higher rate of disaster recovery planning in businesses started since the 1997 flood than in businesses started before the flood and still in business. Such an outcome indicates a need for public policy actions emphasizing the importance of disaster planning. Improved disaster planning is an aid to business recovery and the results demonstrate the need for more widespread efforts to improve disaster recovery planning on the part of smaller businesses, even in areas that have recently experienced disasters.
Vulnerability-based evaluation of water supply design under climate change
NASA Astrophysics Data System (ADS)
Umit Taner, Mehmet; Ray, Patrick; Brown, Casey
2015-04-01
Long-lived water supply infrastructures are strategic investments in the developing world, serving the purpose of balancing water deficits compounded by both population growth and socio-economic development. Robust infrastructure design under climate change is compelling, and often addressed by focusing on the outcomes of climate model projections ('scenario-led' planning), or by identifying design options that are less vulnerable to a wide range of plausible futures ('vulnerability-based' planning). Decision-Scaling framework combines these two approaches by first applying a climate stress test on the system to explore vulnerabilities across many traces of the future, and then employing climate projections to inform the decision-making process. In this work, we develop decision scaling's nascent risk management concepts further, directing actions on vulnerabilities identified during the climate stress test. In the process, we present a new way to inform climate vulnerability space using climate projections, and demonstrate the use of multiple decision criteria to guide to a final design recommendation. The concepts are demonstrated for a water supply project in the Mombasa Province of Kenya, planned to provide domestic and irrigation supply. Six storage design capacities (from 40 to 140 million cubic meters) are explored through a stress test, under a large number climate traces representing both natural climate variability and plausible climate changes. Design outcomes are simulated over a 40-year planning period with a coupled hydrologic-water resources systems model and using standard reservoir operation rules. Resulting performance is expressed in terms of water supply reliability and economic efficiency. Ensemble climate projections are used for assigning conditional likelihoods to the climate traces using a statistical distance measure. The final design recommendations are presented and discussed for the decision criteria of expected regret, satisficing, and conditional value-at-risk (CVaR).
NASA Technical Reports Server (NTRS)
Flamm, Jeffrey D.; James, Kevin D.; Bonet, John T.
2016-01-01
The NASA Environmentally Responsible Aircraft Project (ERA) was a ve year project broken into two phases. In phase II, high N+2 Technical Readiness Level demonstrations were grouped into Integrated Technology Demonstrations (ITD). This paper describes the work done on ITD-51A: the Vehicle Systems Integration, Engine Airframe Integration Demonstration. Refinement of a Hybrid Wing Body (HWB) aircraft from the possible candidates developed in ERA Phase I was continued. Scaled powered, and unpowered wind- tunnel testing, with and without acoustics, in the NASA LARC 14- by 22-foot Subsonic Tunnel, the NASA ARC Unitary Plan Wind Tunnel, and the 40- by 80-foot test section of the National Full-Scale Aerodynamics Complex (NFAC) in conjunction with very closely coupled Computational Fluid Dynamics was used to demonstrate the fuel burn and acoustic milestone targets of the ERA Project.
Three-dimensional landing zone joint capability technology demonstration
NASA Astrophysics Data System (ADS)
Savage, James; Goodrich, Shawn; Ott, Carl; Szoboszlay, Zoltan; Perez, Alfonso; Soukup, Joel; Burns, H. N.
2014-06-01
The Three-Dimensional Landing Zone (3D-LZ) Joint Capability Technology Demonstration (JCTD) is a 27-month program to develop an integrated LADAR and FLIR capability upgrade for USAF Combat Search and Rescue HH-60G Pave Hawk helicopters through a retrofit of current Raytheon AN/AAQ-29 turret systems. The 3D-LZ JCTD builds upon a history of technology programs using high-resolution, imaging LADAR to address rotorcraft cruise, approach to landing, landing, and take-off in degraded visual environments with emphasis on brownout, cable warning and obstacle avoidance, and avoidance of controlled flight into terrain. This paper summarizes ladar development, flight test milestones, and plans for a final flight test demonstration and Military Utility Assessment in 2014.
Kilopower: Small and Affordable Fission Power Systems for Space
NASA Technical Reports Server (NTRS)
Mason, Lee; Palac, Don; Gibson, Marc
2017-01-01
The Nuclear Systems Kilopower Project was initiated by NASA's Space Technology Mission Directorate Game Changing Development Program in fiscal year 2015 to demonstrate subsystem-level technology readiness of small space fission power in a relevant environment (Technology Readiness Level 5) for space science and human exploration power needs. The Nuclear Systems Kilopower Project centerpiece is the Kilopower Reactor Using Stirling Technology (KRUSTY) test, which consists of the development and testing of a fission ground technology demonstrator of a 1 kWe-class fission power system. The technologies to be developed and validated by KRUSTY are extensible to space fission power systems from 1 to 10 kWe, which can enable higher power future potential deep space science missions, as well as modular surface fission power systems for exploration. The Kilopower Project is cofounded by NASA and the Department of Energy National Nuclear Security Administration (NNSA).KRUSTY include the reactor core, heat pipes to transfer the heat from the core to the power conversion system, and the power conversion system. Los Alamos National Laboratory leads the design of the reactor, and the Y-12 National Security Complex is fabricating it. NASA Glenn Research Center (GRC) has designed, built, and demonstrated the balance of plant heat transfer and power conversion portions of the KRUSTY experiment. NASA MSFC developed an electrical reactor simulator for non-nuclear testing, and the design of the reflector and shielding for nuclear testing. In 2016, an electrically heated non-fissionable Depleted Uranium (DU) core was tested at GRC in a configuration identical to the planned nuclear test. Once the reactor core has been fabricated and shipped to the Device Assembly Facility at the NNSAs Nevada National Security Site, the KRUSTY nuclear experiment will be assembled and tested. Completion of the KRUSTY experiment will validate the readiness of 1 to 10 kWe space fission technology for NASAs future requirements for sunlight-independent space power. An early opportunity for demonstration of In-Situ Resource Utilization (ISRU) capability on the surface of Mars is currently being considered for 2026 launch. Since a space fission system is the leading option for power generation for the first Mars human outpost, a smaller version of a planetary surface fission power system could be built to power the ISRU demonstration and ensure its end-to-end validity. Planning is underway to start the hardware development of this subscale flight demonstrator in 2018.
Forestry timber typing. Tanana demonstration project, Alaska ASVT. [Alaska
NASA Technical Reports Server (NTRS)
Morrissey, L. A.; Ambrosia, V. G.
1982-01-01
The feasibility of using LANDSAT digital data in conjunction with topographic data to delineate commercial forests by stand size and crown closure in the Tanana River basin of Alaska was tested. A modified clustering approach using two LANDSAT dates to generate an initial forest type classification was then refined with topographic data. To further demonstrate the ability of remotely sensed data in a fire protection planning framework, the timber type data were subsequently integrated with terrain information to generate a fire hazard map of the study area. This map provides valuable assistance in initial attack planning, determining equipment accessibility, and fire growth modeling. The resulting data sets were incorporated into the Alaska Department of Natural Resources geographic information system for subsequent utilization.
Intelligent systems technology infrastructure for integrated systems
NASA Technical Reports Server (NTRS)
Lum, Henry
1991-01-01
A system infrastructure must be properly designed and integrated from the conceptual development phase to accommodate evolutionary intelligent technologies. Several technology development activities were identified that may have application to rendezvous and capture systems. Optical correlators in conjunction with fuzzy logic control might be used for the identification, tracking, and capture of either cooperative or non-cooperative targets without the intensive computational requirements associated with vision processing. A hybrid digital/analog system was developed and tested with a robotic arm. An aircraft refueling application demonstration is planned within two years. Initially this demonstration will be ground based with a follow-on air based demonstration. System dependability measurement and modeling techniques are being developed for fault management applications. This involves usage of incremental solution/evaluation techniques and modularized systems to facilitate reuse and to take advantage of natural partitions in system models. Though not yet commercially available and currently subject to accuracy limitations, technology is being developed to perform optical matrix operations to enhance computational speed. Optical terrain recognition using camera image sequencing processed with optical correlators is being developed to determine position and velocity in support of lander guidance. The system is planned for testing in conjunction with Dryden Flight Research Facility. Advanced architecture technology is defining open architecture design constraints, test bed concepts (processors, multiple hardware/software and multi-dimensional user support, knowledge/tool sharing infrastructure), and software engineering interface issues.
Choosing a reliability inspection plan for interval censored data
Lu, Lu; Anderson-Cook, Christine Michaela
2017-04-19
Reliability test plans are important for producing precise and accurate assessment of reliability characteristics. This paper explores different strategies for choosing between possible inspection plans for interval censored data given a fixed testing timeframe and budget. A new general cost structure is proposed for guiding precise quantification of total cost in inspection test plan. Multiple summaries of reliability are considered and compared as the criteria for choosing the best plans using an easily adapted method. Different cost structures and representative true underlying reliability curves demonstrate how to assess different strategies given the logistical constraints and nature of the problem. Resultsmore » show several general patterns exist across a wide variety of scenarios. Given the fixed total cost, plans that inspect more units with less frequency based on equally spaced time points are favored due to the ease of implementation and consistent good performance across a large number of case study scenarios. Plans with inspection times chosen based on equally spaced probabilities offer improved reliability estimates for the shape of the distribution, mean lifetime, and failure time for a small fraction of population only for applications with high infant mortality rates. The paper uses a Monte Carlo simulation based approach in addition to the common evaluation based on the asymptotic variance and offers comparison and recommendation for different applications with different objectives. Additionally, the paper outlines a variety of different reliability metrics to use as criteria for optimization, presents a general method for evaluating different alternatives, as well as provides case study results for different common scenarios.« less
Choosing a reliability inspection plan for interval censored data
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lu, Lu; Anderson-Cook, Christine Michaela
Reliability test plans are important for producing precise and accurate assessment of reliability characteristics. This paper explores different strategies for choosing between possible inspection plans for interval censored data given a fixed testing timeframe and budget. A new general cost structure is proposed for guiding precise quantification of total cost in inspection test plan. Multiple summaries of reliability are considered and compared as the criteria for choosing the best plans using an easily adapted method. Different cost structures and representative true underlying reliability curves demonstrate how to assess different strategies given the logistical constraints and nature of the problem. Resultsmore » show several general patterns exist across a wide variety of scenarios. Given the fixed total cost, plans that inspect more units with less frequency based on equally spaced time points are favored due to the ease of implementation and consistent good performance across a large number of case study scenarios. Plans with inspection times chosen based on equally spaced probabilities offer improved reliability estimates for the shape of the distribution, mean lifetime, and failure time for a small fraction of population only for applications with high infant mortality rates. The paper uses a Monte Carlo simulation based approach in addition to the common evaluation based on the asymptotic variance and offers comparison and recommendation for different applications with different objectives. Additionally, the paper outlines a variety of different reliability metrics to use as criteria for optimization, presents a general method for evaluating different alternatives, as well as provides case study results for different common scenarios.« less
Ye, Xiaoduan; O'Neil, Patrick K; Foster, Adrienne N; Gajda, Michal J; Kosinski, Jan; Kurowski, Michal A; Bujnicki, Janusz M; Friedman, Alan M; Bailey-Kellogg, Chris
2004-12-01
Emerging high-throughput techniques for the characterization of protein and protein-complex structures yield noisy data with sparse information content, placing a significant burden on computation to properly interpret the experimental data. One such technique uses cross-linking (chemical or by cysteine oxidation) to confirm or select among proposed structural models (e.g., from fold recognition, ab initio prediction, or docking) by testing the consistency between cross-linking data and model geometry. This paper develops a probabilistic framework for analyzing the information content in cross-linking experiments, accounting for anticipated experimental error. This framework supports a mechanism for planning experiments to optimize the information gained. We evaluate potential experiment plans using explicit trade-offs among key properties of practical importance: discriminability, coverage, balance, ambiguity, and cost. We devise a greedy algorithm that considers those properties and, from a large number of combinatorial possibilities, rapidly selects sets of experiments expected to discriminate pairs of models efficiently. In an application to residue-specific chemical cross-linking, we demonstrate the ability of our approach to plan experiments effectively involving combinations of cross-linkers and introduced mutations. We also describe an experiment plan for the bacteriophage lambda Tfa chaperone protein in which we plan dicysteine mutants for discriminating threading models by disulfide formation. Preliminary results from a subset of the planned experiments are consistent and demonstrate the practicality of planning. Our methods provide the experimenter with a valuable tool (available from the authors) for understanding and optimizing cross-linking experiments.
Joint Service Solvent Substitution (JS3)
2012-05-01
Process Evaluation Acceptance Criteria Market Research Demonstration Plan Demonstration Validate Implementation Approval Start Approval...PRF-63460D Mg (AZ 31B-H24) mg/cm^2 0.7 Mg (SAE AMS 4377) “ Al (AMS-QQ-A-250) “ Al (7075-T6) “ 0.49 Ti (AMS 4911, 6AL- 4V ...properties – Evaluation of vendor test results – Industry experience – DOD Aerospace & Shipbuilding NESHAP experience Market Research 21 Approved for
Satellite Test of the Equivalence Principle, Overview and Progress
NASA Technical Reports Server (NTRS)
Kolodziejczak, Jeffery
2006-01-01
An overview of STEP, the Satellite test of the Equivalence Principle will be presented. This space-based experiment will test the Universality of free fall and is designed to advance the present state of knowledge by over 5 orders of magnitude. The international STEP collaboration is pursuing a development plan to improve and verify the technology readiness of key systems. We will discuss recent advances with an emphasis on accelerometer fabrication and test. The transfer of critical technologies successfully demonstrated in flight by the Gravity Probe B mission will be described.
DOT National Transportation Integrated Search
2012-08-01
This report presents the test plan for conducting the Technical Capability Analysis for the United States Department of Transportation (U.S. DOT) evaluation of the San Diego Integrated Corridor Management (ICM) Initiative Demonstration. The ICM proje...
DOT National Transportation Integrated Search
2012-08-01
This report presents the test plan for conducting the Decision Support System Analysis for the United States Department of Transportation (U.S. DOT) evaluation of the San Diego Integrated Corridor Management (ICM) Initiative Demonstration. The ICM pr...
DOT National Transportation Integrated Search
1998-09-01
This flyer summarizes the activities and results of a preliminary human factors review for the Intelligent Vehicle Initiative (IVI) Program. As part of the IVI program, the Federal Highway Administration funded a project to investigate the human fact...
Overseas testing of a multisensor landmine detection system: results and lessons learned
NASA Astrophysics Data System (ADS)
Keranen, Joe G.; Topolosky, Zeke
2009-05-01
The Nemesis detection system has been developed to provide an efficient and reliable unmanned, multi-sensor, groundbased platform to detect and mark landmines. The detection system consists of two detection sensor arrays: a Ground Penetrating Synthetic Aperture Radar (GPSAR) developed by Planning Systems, Inc. (PSI) and an electromagnetic induction (EMI) sensor array developed by Minelab Electronics, PTY. Limited. Under direction of the Night Vision and Electronic Sensors Directorate (NVESD), overseas testing was performed at Kampong Chhnang Test Center (KCTC), Cambodia, from May 12-30, 2008. Test objectives included: evaluation of detection performance, demonstration of real-time visualization and alarm generation, and evaluation of system operational efficiency. Testing was performed on five sensor test lanes, each consisting of a unique soil mixture and three off-road lanes which include curves, overgrowth, potholes, and non-uniform lane geometry. In this paper, we outline the test objectives, procedures, results, and lessons learned from overseas testing. We also describe the current state of the system, and plans for future enhancements and modifications including clutter rejection and feature-level fusion.
DOE Office of Scientific and Technical Information (OSTI.GOV)
McLellan, G.W.
This test plan describes the field demonstration of the sonic drilling system being conducted as a coordinated effort between the VOC-Arid ID (Integrated Demonstration) and the 200 West Area Carbon Tetrachloride ERA (Expedited Response Action) programs at Hanford. The purpose of this test is to evaluate the Water Development Corporation`s drilling system, modify components as necessary and determine compatible drilling applications for the sonic drilling method for use at facilities in the DOE complex. The sonic demonstration is being conducted as the first field test under the Cooperative Research and Development Agreement (CRADA) which involves the US Department of Energy,more » Pacific Northwest Laboratory, Westinghouse Hanford Company and Water Development Corporation. The sonic drilling system will be used to drill a 45 degree vadose zone well, two vertical wells at the VOC-Arid ID site, and several test holes at the Drilling Technology Test Site north of the 200 Area fire station. Testing at other locations will depend on the performance of the drilling method. Performance of this technology will be compared to the baseline drilling method (cable-tool).« less
Predicted effects of proposed new regulation plans on sedge/grass meadows of Lake Ontario
Wilcox, D.A.; Xie, Y.
2008-01-01
Previously described models for predicting the percent of Lake Ontario wetlands that would be occupied by sedge/grass-dominated meadow marsh were used to test four proposed new plans for regulation of lake levels and to make comparisons with the current plan and unregulated conditions. The models for drowned river mouth, barrier beach, open embayment, and protected embayment wetlands assessed responses to lake levels that would be generated by each plan under net total supplies modified from those that occurred from1900 to 2000. In years when reduced supplies would allow meadow marsh regeneration, simulated unregulated lake levels produced the most meadow marsh in all wetland geomorphic types; current Plan 1958DD produced the least. Overall predicted percent meadow marsh under the test plans decreased in the order B+, 2007, D+, and A+, and the latter three plans produced rather similar results in many cases. Lower percentages of meadow marsh under some plans were due to insufficient low lake levels that could allow soils to dry and restrict invasion by cattails, as well as lack of periodic high lake levels that could kill invading upland plants. An assessment of seasonal lake-level characteristics demonstrated that Plan 2007 would reduce mean winter lake levels by 13 cm or more than Plan B+ and springtime lake levels by more than 10 cm. These seasonal differences could result in less winter habitat for muskrats and reduced access to spring spawning habitats for fish such as northern pike. Our model results provide important information for use in the process of selecting a new regulation plan for Lake Ontario.
NASA Astrophysics Data System (ADS)
Reed, P. M.
2013-12-01
Water resources planning and management has always required the consideration of uncertainties and the associated system vulnerabilities that they may cause. Despite the long legacy of these issues, our decision support frameworks that have dominated the literature over the past 50 years have struggled with the strongly multiobjective and deeply uncertain nature of water resources systems. The term deep uncertainty (or Knightian uncertainty) refers to factors in planning that strongly shape system risks that maybe unknown and even if known there is a strong lack of consensus on their likelihoods over decadal planning horizons (population growth, financial stability, valuation of resources, ecosystem requirements, evolving water institutions, regulations, etc). In this presentation, I will propose and demonstrate the many-objective robust decision making (MORDM) framework for water resources management under deep uncertainty. The MORDM framework will be demonstrated using an urban water portfolio management test case. In the test case, a city in the Lower Rio Grande Valley managing population and drought pressures must cost effectively maintain the reliability of its water supply by blending permanent rights to reservoir inflows with alternative strategies for purchasing water within the region's water market. The case study illustrates the significant potential pitfalls in the classic Cost-Reliability conception of the problem. Moreover, the proposed MORDM framework exploits recent advances in multiobjective search, visualization, and sensitivity analysis to better expose these pitfalls en route to identifying highly robust water planning alternatives.
Status of the Combined Cycle Engine Rig
NASA Technical Reports Server (NTRS)
Saunders, Dave; Slater, John; Dippold, Vance
2009-01-01
Status for the past year is provided of the turbine-based Combined-Cycle Engine (CCE) Rig for the hypersonic project. As part of the first stage propulsion of a two-stage-to-orbit vehicle concept, this engine rig is designed with a common inlet that supplies flow to a turbine engine and a dual-mode ramjet / scramjet engine in an over/under configuration. At Mach 4 the inlet has variable geometry to switch the airflow from the turbine to the ramjet / scramjet engine. This process is known as inlet mode-transition. In addition to investigating inlet aspects of mode transition, the rig will allow testing of turbine and scramjet systems later in the test series. Fully closing the splitter cowl "cocoons" the turbine engine and increases airflow to the scramjet duct. The CCE Rig will be a testbed to investigate integrated propulsion system and controls technology objectives. Four phases of testing are planned to 1) characterize the dual inlet database, 2) collect inlet dynamics using system identification techniques, 3) implement an inlet control to demonstrate mode-transition scenarios and 4) demonstrate integrated inlet/turbine engine operation through mode-transition. Status of the test planning and preparation activities is summarized with background on the inlet design and small-scale testing, analytical CFD predictions and some details of the large-scale hardware. The final stages of fabrication are underway.
Doig, Emmah; Prescott, Sarah; Fleming, Jennifer; Cornwell, Petrea; Kuipers, Pim
2016-01-01
To examine the internal reliability and test-retest reliability of the Client-Centeredness of Goal Setting (C-COGS) scale. The C-COGS scale was administered to 42 participants with acquired brain injury after completion of multidisciplinary goal planning. Internal reliability of scale items was examined using item-partial total correlations and Cronbach's α coefficient. The scale was readministered within a 1-mo period to a subsample of 12 participants to examine test-retest reliability by calculating exact and close percentage agreement for each item. After examination of item-partial total correlations, test items were revised. The revised items demonstrated stronger internal consistency than the original items. Preliminary evaluation of test-retest reliability was fair, with an average exact percent agreement across all test items of 67%. Findings support the preliminary reliability of the C-COGS scale as a tool to evaluate and promote client-centered goal planning in brain injury rehabilitation. Copyright © 2016 by the American Occupational Therapy Association, Inc.
Opp, Daniel; Nelms, Benjamin E.; Zhang, Geoffrey; Stevens, Craig
2013-01-01
3DVH software (Sun Nuclear Corp., Melbourne, FL) is capable of generating a volumetric patient VMAT dose by applying a volumetric perturbation algorithm based on comparing measurement‐guided dose reconstruction and TPS‐calculated dose to a cylindrical phantom. The primary purpose of this paper is to validate this dose reconstruction on an anthropomorphic heterogeneous thoracic phantom by direct comparison to independent measurements. The dosimetric insert to the phantom is novel, and thus the secondary goal is to demonstrate how it can be used for the hidden target end‐to‐end testing of VMAT treatments in lung. A dosimetric insert contains a 4 cm diameter unit‐density spherical target located inside the right lung (0.21g/cm3 density). It has 26 slots arranged in two orthogonal directions, milled to hold optically stimulated luminescent dosimeters (OSLDs). Dose profiles in three cardinal orthogonal directions were obtained for five VMAT plans with varying degrees of modulation. After appropriate OSLD corrections were applied, 3DVH measurement‐guided VMAT dose reconstruction agreed 100% with the measurements in the unit density target sphere at 3%/3 mm level (composite analysis) for all profile points for the four less‐modulated VMAT plans, and for 96% of the points in the highly modulated C‐shape plan (from TG‐119). For this latter plan, while 3DVH shows acceptable agreement with independent measurements in the unit density target, in the lung disagreement with experiment is relatively high for both the TPS calculation and 3DVH reconstruction. For the four plans excluding the C‐shape, 3%/3mm overall composite analysis passing rates for 3DVH against independent measurement ranged from 93% to 100%. The C‐shape plan was deliberately chosen as a stress test of the algorithm. The dosimetric spatial alignment hidden target test demonstrated the average distance to agreement between the measured and TPS profiles in the steep dose gradient area at the edge of the 2 cm target to be 1.0±0.7,0.3±0.3, and 0.3±0.3mm for the IEC X, Y, and Z directions, respectively. PACS number: 87.55Qr PMID:23835381
Optical Autocovariance Wind Lidar (OAWL): aircraft test-flight history and current plans
NASA Astrophysics Data System (ADS)
Tucker, Sara C.; Weimer, Carl; Adkins, Mike; Delker, Tom; Gleeson, David; Kaptchen, Paul; Good, Bill; Kaplan, Mike; Applegate, Jeff; Taudien, Glenn
2015-09-01
To address mission risk and cost limitations the US has faced in putting a much needed Doppler wind lidar into space, Ball Aerospace and Technologies Corp, with support from NASA's Earth Science Technology Office (ESTO), has developed the Optical Autocovariance Wind Lidar (OAWL), designed to measure winds from aerosol backscatter at the 355 nm or 532 nm wavelengths. Preliminary proof of concept hardware efforts started at Ball back in 2004. From 2008 to 2012, under an ESTO-funded Instrument Incubator Program, Ball incorporated the Optical Autocovariance (OA) interferometer receiver into a prototype breadboard lidar system by adding a laser, telescope, and COTS-based data system for operation at the 355 nm wavelength. In 2011, the prototype system underwent ground-based validation testing, and three months later, after hardware and software modifications to ensure autonomous operation and aircraft safety, it was flown on the NASA WB-57 aircraft. The history of the 2011 test flights are reviewed, including efforts to get the system qualified for aircraft flights, modifications made during the flight test period, and the final flight data results. We also present lessons learned and plans for the new, robust, two-wavelength, aircraft system with flight demonstrations planned for Spring 2016.
Hydrogen-Fuel Engine Component Tests Near Completion
NASA Technical Reports Server (NTRS)
2003-01-01
Gaseous hydrogen is burned off at the E1 Test Stand the night of Oct. 7 during a cold-flow test of the fuel turbopump of the Integrated Powerhead Demonstrator (IPD) at NASA Stennis Space Center (SSC). The gaseous hydrogen spins the pump's turbine during the test, which was conducted to verify the pump's performance. Engineers plan one more test before sending the pump to The Boeing Co. for inspection. It will then be returned to SSC for engine system assembly. The IPD is the first reusable hydrogen-fueled advanced engine in development since the Space Shuttle Main Engine.
Hydrogen-Fuel Engine Component Tests Near Completion
2003-11-05
Gaseous hydrogen is burned off at the E1 Test Stand the night of Oct. 7 during a cold-flow test of the fuel turbopump of the Integrated Powerhead Demonstrator (IPD) at NASA Stennis Space Center (SSC). The gaseous hydrogen spins the pump's turbine during the test, which was conducted to verify the pump's performance. Engineers plan one more test before sending the pump to The Boeing Co. for inspection. It will then be returned to SSC for engine system assembly. The IPD is the first reusable hydrogen-fueled advanced engine in development since the Space Shuttle Main Engine.
DOT National Transportation Integrated Search
2012-07-01
This report presents the Cost Benefit Analysis Test Plan for the national evaluation of the Los Angeles County Congestion Reduction Demonstration (LAC CRD) under the United States Department of Transportation (U.S. DOT) Congestion Reduction Demonstra...
Parallel overinterpretation of behavior of apes and corvids.
Hampton, Robert
2018-06-20
The report by Kabadayi and Osvath (Science, 357(6347), 202-204, 2017) does not demonstrate planning in ravens. The behavior of corvids and apes is fascinating and will be best appreciated through well-designed experiments that explicitly test alternative explanations and that are interpreted without unjustified anthropomorphic embellishment.
The Product as Change Agent: The Process of Development.
ERIC Educational Resources Information Center
Bank, Adrianne
Instructional product development--the purpose of which has been to create materials which produce in an identified population of users demonstrable changes in behavior, in accordance with prespecified and specific objectives--generally adheres to a pattern which includes planning, formulating, prototyping measures and materials, field testing,…
DOT National Transportation Integrated Search
2012-04-01
This report presents the Safety Data Test Plan for the national evaluation of the Los Angeles County Congestion Reduction Demonstration (CRD) under the United States Department of Transportation (U.S. DOT) Urban Partnership Agreement (UPA) Program. T...
DOT National Transportation Integrated Search
2012-04-01
This report presents the Content Analysis Test Plan for the national evaluation of the Los Angeles County Congestion Reduction Demonstration (CRD) under the United States Department of Transportation (U.S. DOT) Urban Partnership Agreement (UPA) Progr...
Fuel efficient traffic signal operation and evaluation: Garden Grove Demonstration Project
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1983-02-01
The procedures and results of a case study of fuel efficient traffic signal operation and evaluation in the City of Garden Grove, California are documented. Improved traffic signal timing was developed for a 70-intersection test network in Garden Grove using an optimization tool called the TRANSYT Version 8 computer program. Full-scale field testing of five alternative timing plans was conducted using two instrumented vehicles equipped to measure traffic performance characteristics and fuel consumption. The field tests indicated that significant improvements in traffic flow and fuel consumption result from the use of timing plans generated by the TRANSYT optimization model. Changingmore » from pre-existing to an optimized timing plan yields a networkwide 5 percent reduction in total travel time, more than 10 percent reduction in both the number of stops and stopped delay time, and 6 percent reduction in fuel consumption. Projections are made of the benefits and costs of implementing such a program at the 20,000 traffic signals in networks throughout the State of California.« less
NASA Astrophysics Data System (ADS)
Fairley, J. P., Jr.; Oyarzún L, R.; Villegas, G.
2015-12-01
Early theories of fluid migration in unsaturated fractured rock hypothesized that matrix suction would dominate flow up to the point of matrix saturation. However, experiments in underground laboratories such as the ESF (Yucca Mountain, NV) have demonstrated that liquid water can migrate significant distances through fractures in an unsaturated porous medium, suggesting limited interaction between fractures and unsaturated matrix blocks and potentially rapid transmission of recharge to the sat- urated zone. Determining the conditions under which this rapid recharge may take place is an important factor in understanding deep percolation processes in arid areas with thick unsaturated zones. As part of an on-going, Fondecyt-funded project (award 11150587) to study mountain block hydrological processes in arid regions, we are plan- ning a series of in-situ fracture flow injection tests in the Cerro Brillador/Mina Escuela, an underground laboratory and teaching facility belonging to the Universidad la Serena, Chile. Planning for the tests is based on an analytical model and curve-matching method, originally developed to evaluate data from injection tests at Yucca Mountain (Fairley, J.P., 2010, WRR 46:W08542), that uses a known rate of liquid injection to a fracture (for example, from a packed-off section of borehole) and the observed rate of seepage discharging from the fracture to estimate effective fracture aperture, matrix sorptivity, fracture/matrix flow partitioning, and the wetted fracture/matrix interac- tion area between the injection and recovery points. We briefly review the analytical approach and its application to test planning and analysis, and describe the proposed tests and their goals.
Irradiation Tests Supporting LEU Conversion of Very High Power Research Reactors in the US
DOE Office of Scientific and Technical Information (OSTI.GOV)
Woolstenhulme, N. E.; Cole, J. I.; Glagolenko, I.
The US fuel development team is developing a high density uranium-molybdenum alloy monolithic fuel to enable conversion of five high-power research reactors. Previous irradiation tests have demonstrated promising behavior for this fuel design. A series of future irradiation tests will enable selection of final fuel fabrication process and provide data to qualify the fuel at moderately-high power conditions for use in three of these five reactors. The remaining two reactors, namely the Advanced Test Reactor and High Flux Isotope Reactor, require additional irradiation tests to develop and demonstrate the fuel’s performance with even higher power conditions, complex design features, andmore » other unique conditions. This paper reviews the program’s current irradiation testing plans for these moderately-high irradiation conditions and presents conceptual testing strategies to illustrate how subsequent irradiation tests will build upon this initial data package to enable conversion of these two very-high power research reactors.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Shiraishi, Satomi; Moore, Kevin L., E-mail: kevinmoore@ucsd.edu
Purpose: To demonstrate knowledge-based 3D dose prediction for external beam radiotherapy. Methods: Using previously treated plans as training data, an artificial neural network (ANN) was trained to predict a dose matrix based on patient-specific geometric and planning parameters, such as the closest distance (r) to planning target volume (PTV) and organ-at-risks (OARs). Twenty-three prostate and 43 stereotactic radiosurgery/radiotherapy (SRS/SRT) cases with at least one nearby OAR were studied. All were planned with volumetric-modulated arc therapy to prescription doses of 81 Gy for prostate and 12–30 Gy for SRS. Using these clinically approved plans, ANNs were trained to predict dose matrixmore » and the predictive accuracy was evaluated using the dose difference between the clinical plan and prediction, δD = D{sub clin} − D{sub pred}. The mean (〈δD{sub r}〉), standard deviation (σ{sub δD{sub r}}), and their interquartile range (IQR) for the training plans were evaluated at a 2–3 mm interval from the PTV boundary (r{sub PTV}) to assess prediction bias and precision. Initially, unfiltered models which were trained using all plans in the cohorts were created for each treatment site. The models predict approximately the average quality of OAR sparing. Emphasizing a subset of plans that exhibited superior to the average OAR sparing during training, refined models were created to predict high-quality rectum sparing for prostate and brainstem sparing for SRS. Using the refined model, potentially suboptimal plans were identified where the model predicted further sparing of the OARs was achievable. Replans were performed to test if the OAR sparing could be improved as predicted by the model. Results: The refined models demonstrated highly accurate dose distribution prediction. For prostate cases, the average prediction bias for all voxels irrespective of organ delineation ranged from −1% to 0% with maximum IQR of 3% over r{sub PTV} ∈ [ − 6, 30] mm. The average prediction error was less than 10% for the same r{sub PTV} range. For SRS cases, the average prediction bias ranged from −0.7% to 1.5% with maximum IQR of 5% over r{sub PTV} ∈ [ − 4, 32] mm. The average prediction error was less than 8%. Four potentially suboptimal plans were identified for each site and subsequent replanning demonstrated improved sparing of rectum and brainstem. Conclusions: The study demonstrates highly accurate knowledge-based 3D dose predictions for radiotherapy plans.« less
Ground Testing of a 10 K Sorption Cryocooler Flight Experiment (BETSCE)
NASA Technical Reports Server (NTRS)
Bard, S.; Wu, J.; Karlmann, P.; Cowgill, P.; Mirate, C.; Rodriguez, J.
1994-01-01
The Brilliant Eyes Ten-Kelvin Sorption Cryocooler Experiment (BETSCE) is a Space Shuttle side-wall-mounted flight experiment designed to demonstrate 10 K sorption cryocooler technology in a space environment. The BETSCE objectives are to: (1) provide a thorough end-to-end characterization and space performance validation of a complete, multistage, automated, closed-cycle hydride sorption cryocooler in the 10 to 30 K temperature range, (2) acquire the quantitative microgravity database required to provide confident engineering design, scaling, and optimization, (3) advance the enabling technologies and resolve integration issues, and (4) provide hardware qualification and safety verification heritage. BETSCE ground tests were the first-ever demonstration of a complete closed-cycle 10 K sorption cryocooler. Test results exceeded functional requirements. This paper summarizes functional and environmental ground test results, planned characterization tests, important development challenges that were overcome, and valuable lessons-learned.
Crane Cell Testing Support of NASA/Goddard Space Flight Center: An Update
NASA Technical Reports Server (NTRS)
Strawn, Mike; David, Jerry; Rao, Gopalakrishna M.
2001-01-01
The objectives presented in this viewgraph presentation include: 1) Verify the quality and reliability of aerospace battery cells and batteries for NASA flight programs; 2) Disseminate the data to develop a plan for in-orbit battery management and to design a cell/battery for future NASA spacecraft; and 3) Establish a cell test data base for rechargeable cell/batteries. In summary: quality EPT Ni-H2, EPT Super NiCd and SAFT NiCd cells have been demonstrated for aerospace applications; the data has been provided to NASA Centers and other agencies for their use and application; developed plan and used in NASA in-orbit battery management. Database on rechargeable cell/batteries is now available for customer use.
Horne, Justine; Madill, Janet; Gilliland, Jason
2017-11-01
The 'Theory of Planned Behavior' (TPB) has been tested and validated in the scientific literature across multiple disciplines and is arguably the most widely accepted theory among behavior change academics. Despite this widespread acceptability, the TPB has yet to be incorporated into personalized healthcare behavior change research. Several prominent personalized healthcare researchers suggest that personalizing healthcare recommendations have a positive impact on changes in lifestyle habits. However, research in this area has demonstrated conflicting findings. We provide a scientific and theoretical basis to support a proposed expansion of the TPB to include personalization, and call to action-personalized healthcare behavior change researchers to test this expansion. Specific recommendations for study design are included.
Kilianski, Andy; O'Rourke, Amy T; Carlson, Crystal L; Parikh, Shannon M; Shipman-Amuwo, Frankie
2014-01-01
Increasing threats of bioterrorism and the emergence of novel disease agents, including the recent international outbreaks of H7N9 influenza and MERS-CoV, have stressed the importance and highlighted the need for public health preparedness at local, regional, and national levels. To test plans that were developed for mass prophylaxis scenarios, in April 2013 the Cook Country Department of Public Health (CCDPH) and the Triple Community (TripCom) Medical Reserve Corps (MRC) executed a full-scale mass prophylaxis exercise in response to a simulated anthrax bioterrorism attack. The exercise took place over 2 days and included the TripCom Point-of-Dispensing (POD) Management Team, volunteers from the TripCom MRC, and neighboring public health departments and MRCs. Individuals from the community volunteered as actors during the exercise, while local municipal, police, and fire personnel coordinated their responses to create the most realistic simulation possible. The exercise was designed to test the capacity of TripCom and CCDPH to implement plans for organizing municipal staff and volunteers to efficiently distribute prophylaxis to the community. Based on results from POD clinic flow, accuracy of prophylaxis distribution, and observations from evaluators, the exercise was successful in demonstrating areas that were operationally efficient as well as identifying areas that can be improved on. These include improvements to the just-in-time training for POD staff, the health screening and consent forms handed out to patients, the physical setup of the POD, and the command structure and communication for the management of POD operations. This article demonstrates the need for full-scale exercises and identifies gaps in POD planning that can be integrated into future plans, exercises, and emergency response.
Cognitive load during route selection increases reliance on spatial heuristics.
Brunyé, Tad T; Martis, Shaina B; Taylor, Holly A
2018-05-01
Planning routes from maps involves perceiving the symbolic environment, identifying alternate routes and applying explicit strategies and implicit heuristics to select an option. Two implicit heuristics have received considerable attention, the southern route preference and initial segment strategy. This study tested a prediction from decision-making theory that increasing cognitive load during route planning will increase reliance on these heuristics. In two experiments, participants planned routes while under conditions of minimal (0-back) or high (2-back) working memory load. In Experiment 1, we examined how memory load impacts the southern route heuristic. In Experiment 2, we examined how memory load impacts the initial segment heuristic. Results replicated earlier results demonstrating a southern route preference (Experiment 1) and initial segment strategy (Experiment 2) and further demonstrated that evidence for heuristic reliance is more likely under conditions of concurrent working memory load. Furthermore, the extent to which participants maintained efficient route selection latencies in the 2-back condition predicted the magnitude of this effect. Together, results demonstrate that working memory load increases the application of heuristics during spatial decision making, particularly when participants attempt to maintain quick decisions while managing concurrent task demands.
Conceptual Study on Hypersonic Turbojet Experimental Vehicle (HYTEX)
NASA Astrophysics Data System (ADS)
Taguchi, Hideyuki; Murakami, Akira; Sato, Tetsuya; Tsuchiya, Takeshi
Pre-cooled turbojet engines have been investigated aiming at realization of reusable space transportation systems and hypersonic airplanes. Evaluation methods of these engine performances have been established based on ground tests. There are some plans on the demonstration of hypersonic propulsion systems. JAXA focused on hypersonic propulsion systems as a key technology of hypersonic transport airplane. Demonstrations of Mach 5 class hypersonic technologies are stated as a development target at 2025 in the long term vision. In this study, systems analyses of hypersonic turbojet experiment (HYTEX) with Mach 5 flight capability is performed. Aerodynamic coefficients are obtained by CFD analyses and wind tunnel tests. Small Pre-cooled turbojet is fabricated and tested using liquid hydrogen as fuel. As a result, characteristics of the baseline vehicle shape is clarified, . and effects of pre-cooling are confirmed at the firing test.
Deep Stimulation at Newberry Volcano EGS Demonstration
NASA Astrophysics Data System (ADS)
Grasso, K.; Cladouhos, T. T.; Petty, S.; Garrison, G. H.; Nordin, Y.; Uddenberg, M.; Swyer, M.
2014-12-01
The Newberry Volcano EGS Demonstration is a 5 year field project designed to demonstrate recent technological advances for engineered geothermal systems (EGS) development. Advances in reservoir stimulation, diverter, and monitoring are being tested in a hot (>300 C), dry well (NWG 55-29) drilled in 2008. These technologies could reduce the cost of electrical power generation. The project began in 2010 with two years of permitting, technical planning, and development of a project-specific Induced Seismicity Mitigation Plan (ISMP), and is funded in part by the Department of Energy. In 2012, the well was hydraulically stimulated with water at pressures below the principle stress for 7 weeks, resulting in hydroshearing. The depth of stimulation was successfully shifted by injection of two pills of Thermally-degradable Zonal Isolation Materials (TZIMs). Injectivity changes, thermal profiles and seismicity indicate that fracture permeability in well NWG 55-29 was enhanced during stimulation. This work successfully demonstrated the viability of large-volume (40,000 m3), low-pressure stimulation coupled with non-mechanical diverter technology, and microseismic monitoring for reservoir mapping. Further analysis and field testing in 2013 indicates further stimulation will be required in order to develop an economically viable reservoir, and is scheduled in 2014. The 2014 stimulation will use improved stimulation and monitoring equipment, better knowledge based on 2012 outcomes, and create a deep EGS reservoir in the hottest part of the wellbore.
Anonymization of DICOM Electronic Medical Records for Radiation Therapy
Newhauser, Wayne; Jones, Timothy; Swerdloff, Stuart; Newhauser, Warren; Cilia, Mark; Carver, Robert; Halloran, Andy; Zhang, Rui
2014-01-01
Electronic medical records (EMR) and treatment plans are used in research on patient outcomes and radiation effects. In many situations researchers must remove protected health information (PHI) from EMRs. The literature contains several studies describing the anonymization of generic Digital Imaging and Communication in Medicine (DICOM) files and DICOM image sets but no publications were found that discuss the anonymization of DICOM radiation therapy plans, a key component of an EMR in a cancer clinic. In addition to this we were unable to find a commercial software tool that met the minimum requirements for anonymization and preservation of data integrity for radiation therapy research. The purpose of this study was to develop a prototype software code to meet the requirements for the anonymization of radiation therapy treatment plans and to develop a way to validate that code and demonstrate that it properly anonymized treatment plans and preserved data integrity. We extended an open-source code to process all relevant PHI and to allow for the automatic anonymization of multiple EMRs. The prototype code successfully anonymized multiple treatment plans in less than 1 minute per patient. We also tested commercial optical character recognition (OCR) algorithms for the detection of burned-in text on the images, but they were unable to reliably recognize text. In addition, we developed and tested an image filtering algorithm that allowed us to isolate and redact alpha-numeric text from a test radiograph. Validation tests verified that PHI was anonymized and data integrity, such as the relationship between DICOM unique identifiers (UID) was preserved. PMID:25147130
Anonymization of DICOM electronic medical records for radiation therapy.
Newhauser, Wayne; Jones, Timothy; Swerdloff, Stuart; Newhauser, Warren; Cilia, Mark; Carver, Robert; Halloran, Andy; Zhang, Rui
2014-10-01
Electronic medical records (EMR) and treatment plans are used in research on patient outcomes and radiation effects. In many situations researchers must remove protected health information (PHI) from EMRs. The literature contains several studies describing the anonymization of generic Digital Imaging and Communication in Medicine (DICOM) files and DICOM image sets but no publications were found that discuss the anonymization of DICOM radiation therapy plans, a key component of an EMR in a cancer clinic. In addition to this we were unable to find a commercial software tool that met the minimum requirements for anonymization and preservation of data integrity for radiation therapy research. The purpose of this study was to develop a prototype software code to meet the requirements for the anonymization of radiation therapy treatment plans and to develop a way to validate that code and demonstrate that it properly anonymized treatment plans and preserved data integrity. We extended an open-source code to process all relevant PHI and to allow for the automatic anonymization of multiple EMRs. The prototype code successfully anonymized multiple treatment plans in less than 1min/patient. We also tested commercial optical character recognition (OCR) algorithms for the detection of burned-in text on the images, but they were unable to reliably recognize text. In addition, we developed and tested an image filtering algorithm that allowed us to isolate and redact alpha-numeric text from a test radiograph. Validation tests verified that PHI was anonymized and data integrity, such as the relationship between DICOM unique identifiers (UID) was preserved. Copyright © 2014 Elsevier Ltd. All rights reserved.
Cluster Development Test 2: An Assessment of a Failed Test
NASA Technical Reports Server (NTRS)
Machin, Ricardo A.; Evans, Carol T.
2009-01-01
On 31 July 2008 the National Aeronautics and Space Administration Crew Exploration Vehicle Parachute Assembly System team conducted the final planned cluster test of the first generation parachute recovery system design. The two primary test objectives were to demonstrate the operation of the complete parachute system deployed from a full scale capsule simulator and to demonstrate the test technique of separating the capsule simulator from the Low Velocity Air Drop pallet used to extract the test article from a United States Air Force C-17 aircraft. The capsule simulator was the Parachute Test Vehicle with an accurate heat shield outer mold line and forward bay compartment of the Crew Exploration Vehicle Command Module. The Parachute Test Vehicle separated cleanly from the pallet following extraction, but failed to reach test conditions resulting in the failure of the test and the loss of the test assets. No personnel were injured. This paper will discuss the design of the test and the findings of the team that investigated the test, including a discussion of what were determined to be the root causes of the failure.
Test Plan - Solids Accumulation Scouting Studies
DOE Office of Scientific and Technical Information (OSTI.GOV)
Duignan, M. R.; Steeper, T. J.; Steimke, J. L.
This plan documents the highlights of the Solids Accumulations Scouting Studies test; a project, from Washington River Protection Solutions (WRPS), that began on February 1, 2012. During the last 12 weeks considerable progress has been made to design and plan methods that will be used to estimate the concentration and distribution of heavy fissile solids in accumulated solids in the Hanford double-shell tank (DST) 241-AW-105 (AW-105), which is the primary goal of this task. This DST will be one of the several waste feed delivery staging tanks designated to feed the Pretreatment Facility (PTF) of the Waste Treatment and Immobilizationmore » Plant (WTP). Note that over the length of the waste feed delivery mission AW-105 is currently identified as having the most fill empty cycles of any DST feed tanks, which is the reason for modeling this particular tank. At SRNL an existing test facility, the Mixing Demonstration Tank, which will be modified for the present work, will use stainless steel particles in a simulant that represents Hanford waste to perform mock staging tanks transfers that will allow solids to accumulate in the tank heel. The concentration and location of the mock fissile particles will be measured in these scoping studies to produce information that will be used to better plan larger scaled tests. Included in these studies is a secondary goal of developing measurement methods to accomplish the primary goal. These methods will be evaluated for use in the larger scale experiments. Included in this plan are the several pretest activities that will validate the measurement techniques that are currently in various phases of construction. Aspects of each technique, e.g., particle separations, volume determinations, topographical mapping, and core sampling, have been tested in bench-top trials, as discussed herein, but the actual equipment to be employed during the full test will need evaluation after fabrication and integration into the test facility.« less
Application of Micro-ramp Flow Control Devices to an Oblique Shock Interaction
NASA Technical Reports Server (NTRS)
Hirt, Stefanie; Anderson, Bernhard
2007-01-01
Tests are planned in the 15cm x 15cm supersonic wind tunnel at NASA Glenn to demonstrate the applicability of micro-ramp flow control to the management of shock wave boundary layer interactions. These tests will be used as a database for computational fluid dynamics (CFD) validation and Design of Experiments (DoE) design information. Micro-ramps show potential for mechanically simple and fail-safe boundary layer control.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Li, Nan; Carmona, Ruben; Sirak, Igor
Purpose: To demonstrate an efficient method for training and validation of a knowledge-based planning (KBP) system as a radiation therapy clinical trial plan quality-control system. Methods and Materials: We analyzed 86 patients with stage IB through IVA cervical cancer treated with intensity modulated radiation therapy at 2 institutions according to the standards of the INTERTECC (International Evaluation of Radiotherapy Technology Effectiveness in Cervical Cancer, National Clinical Trials Network identifier: 01554397) protocol. The protocol used a planning target volume and 2 primary organs at risk: pelvic bone marrow (PBM) and bowel. Secondary organs at risk were rectum and bladder. Initial unfiltered dose-volumemore » histogram (DVH) estimation models were trained using all 86 plans. Refined training sets were created by removing sub-optimal plans from the unfiltered sample, and DVH estimation models… and DVH estimation models were constructed by identifying 30 of 86 plans emphasizing PBM sparing (comparing protocol-specified dosimetric cutpoints V{sub 10} (percentage volume of PBM receiving at least 10 Gy dose) and V{sub 20} (percentage volume of PBM receiving at least 20 Gy dose) with unfiltered predictions) and another 30 of 86 plans emphasizing bowel sparing (comparing V{sub 40} (absolute volume of bowel receiving at least 40 Gy dose) and V{sub 45} (absolute volume of bowel receiving at least 45 Gy dose), 9 in common with the PBM set). To obtain deliverable KBP plans, refined models must inform patient-specific optimization objectives and/or priorities (an auto-planning “routine”). Four candidate routines emphasizing different tradeoffs were composed, and a script was developed to automatically re-plan multiple patients with each routine. After selection of the routine that best met protocol objectives in the 51-patient training sample (KBP{sub FINAL}), protocol-specific DVH metrics and normal tissue complication probability were compared for original versus KBP{sub FINAL} plans across the 35-patient validation set. Paired t tests were used to test differences between planning sets. Results: KBP{sub FINAL} plans outperformed manual planning across the validation set in all protocol-specific DVH cutpoints. The mean normal tissue complication probability for gastrointestinal toxicity was lower for KBP{sub FINAL} versus validation-set plans (48.7% vs 53.8%, P<.001). Similarly, the estimated mean white blood cell count nadir was higher (2.77 vs 2.49 k/mL, P<.001) with KBP{sub FINAL} plans, indicating lowered probability of hematologic toxicity. Conclusions: This work demonstrates that a KBP system can be efficiently trained and refined for use in radiation therapy clinical trials with minimal effort. This patient-specific plan quality control resulted in improvements on protocol-specific dosimetric endpoints.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
This plan covers robotics Research, Development, Demonstration, Testing, activities in the Program for the next five years. These activities range from bench-scale R D to fullscale hot demonstrations at DOE sites. This plan outlines applications of existing technology to near-term needs, the development and application of enhanced technology for longer-term needs, and an initiation of advanced technology development to meet those needs beyond the five-year plan. The objective of the Robotic Technology Development (RTDP) is to develop and apply robotics technologies that will enable Environmental Restoration and Waste Management operations at DOE sites to be safer, faster and cheaper. Fivemore » priority DOE sites were visited in March 1990 to identify needs for robotics technology in ER WM operations. This 5-Year Program Plan for the RTDP detailed annual plans for robotics technology development based on identified needs. This 5-Year Program Plan discusses the overall approach to be adopted by the RTDP to aggressively develop robotics technology and contains discussions of the Program Management Plan, Site Visit and Needs Summary, Approach to Needs-Directed Technical Development, Application-Specific Technical Development, and Cross-Cutting and Advanced Technology. Integrating application-specific ER WM needs, the current state of robotics technology, and the potential benefits (in terms of faster, safer, and cheaper) of new technology, the Plan develops application-specific road maps for robotics RDDT E for the period FY 1991 through FY 1995. In addition, the Plan identifies areas where longer-term research in robotics will have a high payoff in the 5- to 20-year time frame. 12 figs.« less
Dynamic Capability of an Operating Stirling Convertor
NASA Technical Reports Server (NTRS)
Goodnight, Thomas W.; Hughes, William O.; McNelis, Mark E.
2000-01-01
The NASA John H. Glenn Research Center and the US Department of Energy are currently developing a Stirling convertor for use as an advanced spacecraft power system for future NASA deep-space missions. NASA Headquarters has recently identified the Stirling technology generator for potential use as the spacecraft power system for two of NASA's new missions, the Europa Orbiter and the Solar Probe missions (planned for launch in 2006 and 2007 respectively). As part of the development of this power system, a Stirling Technology Demonstration Convertor was vibration tested at NASA John H. Glenn Research Center to verify its survivability and capability of withstanding the harsh dynamic environment typically seen by the spacecraft when it is launched by an expendable launch vehicle. The Technology Demonstration Convertor was fully operational (producing power) during the random vibration testing. The output power of the convertor and other convertor performance indicators were measured during the testing, and these results are discussed in this paper. Numerous accelerometers and force gauges also were used to provide information on the dynamic characteristics of the Technology Demonstration Convertor and as an indication of any possible damage due to the vibration. These measurements will also be discussed in this paper. The vibration testing of the Stirling Technology Demonstration Convertor was extremely successful. The Technology Demonstration Convertor survived all its vibration testing with no structural damage or functional performance degradation. As a result of this testing, the Stirling convertor's capability to withstand vibration has been demonstrated, enabling its usage in future spacecraft power systems.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Bossart, E; Monterroso, M; Couto, M
Purpose: Dosimetrically compare CyberKnife (CK) and linac-based (LB) stereotactic body radiotherapy (SBRT) plans for lumbar spine. Methods: Ten patient plans with lumbar spine tumors treated with CK were selected and retrospectively optimized using three techniques: CK, volumetric modulated arc (VMAT, three arcs), and 9-field-intensity modulated radiotherapy (IMRT). For the LB plans, the target volume was expanded by 1mm to accommodate additional uncertainty in patient positioning. All plans were optimized to a prescription dose of 27Gy in 3 fractions covering 90% of the PTV. If the dose constraints to the cauda equina (cauda) were not met, the prescription dose was loweredmore » to 24Gy. Parameters evaluated included Paddick Conformity-Index (CI) and Gradient-Index (GI). A two-tailed paired t-test was used to establish statistically significant differences in cauda doses. Results: Target volumes for LB plans were on average 38% larger. In terms of the indices, the closer the index values to unity the steeper the dose falloff and the higher the dose conformity to the target. The results showed that LB plans were in general statistically superior to CK plans. The IMRT plan showed the best average gradient index of 2.995, with VMAT and CK GI values of 3.699 and 5.476, respectively. Similarly, the same trend occurs with the average CI results: 0.821, 0.814, and 0.758, corresponding to IMRT, VMAT, and CK. Notably, in one CK plan the target dose was reduced to 24Gy to meet cauda constraints. Additionally, there was a statistically significant dose difference for the cauda between the CK and LB plans. Conclusion: This study demonstrates that LB plans for lumbar spine SBRT can be as effective or even better than CK plans. Despite the expansion of the target volume, the LB plans did not demonstrate dosimetric inferiority. The LB plans Resultin 2-to-3 fold decrease of treatment time.« less
Orr, Richard H.; Pings, Vern M.; Pizer, Irwin H.; Olson, Edwin E.; Spencer, Carol C.
1968-01-01
A method of measuring a library's capability for providing the documents its users need has been developed. The library is tested with a representative sample of such documents to determine how long would be required for users to obtain these documents. Test results are expressed in terms of a Capability Index, which has a maximal value of 100 only if all the sample documents are found “on shelf.” Specific tests employing samples of 300 documents have been developed that are appropriate for academic and for “reservoir” biomedical libraries. Realistic field trials have demonstrated that these two tests are practical to administer and that test results are adequately reproducible. When strict comparability is not important, a library can test itself. In assessing a reservoir library, test results are supplemented by data on its typical processing time for interlibrary loan requests. Currently these tests are being used in a national survey. The general method is applicable to other types of libraries, provided appropriate test samples are established. If their limitations are clearly understood, these “Document Delivery Tests” can be valuable tools for planning and managing library services. PMID:5665969
Tank 241-AZ-101 Mixer Pump Test Vapor Sampling and Analysis Plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
TEMPLETON, A.M.
2000-03-06
This sampling and analysis plan (SAP) identifies characterization objectives pertaining to sample collection, laboratory analytical evaluation, and reporting requirements for vapor samples obtained during the operation of mixer pumps in tank 241-AZ-101. The primary purpose of the mixer pump test (MPT) is to demonstrate that the two 300 horsepower mixer pumps installed in tank 241-AZ-101 can mobilize the settled sludge so that it can be retrieved for treatment and vitrification. Sampling will be performed in accordance with Tank 241-AZ-101 Mixer Pump Test Data Quality Objective (Banning 1999) and Data Quality Objectives for Regulatory Requirements for Hazardous and Radioactive Air Emissionsmore » Sampling and Analysis (Mulkey 1999). The sampling will verify if current air emission estimates used in the permit application are correct and provide information for future air permit applications.« less
Tank 241-AZ-101 Mixer Pump Test Vapor Sampling and Analysis Plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
TEMPLETON, A.M.
2000-01-31
This sampling and analysis plan (SAP) identifies characterization objectives pertaining to sample collection, laboratory analytical evaluation, and reporting requirements for vapor samples obtained during the operation of mixer pumps in tank 241-AZ-101. The primary purpose of the mixer pump test (MPT) is to demonstrate that the two 300 horsepower mixer pumps installed in tank 241-AZ-101 can mobilize the settled sludge so that it can be retrieved for treatment and vitrification Sampling will be performed in accordance with Tank 241-AZ-101 Mixer Pump Test Data Quality Objective (Banning 1999) and Data Quality Objectives for Regulatory Requirements for Hazardous and Radioactive Air Emissionsmore » Sampling and Analysis (Mulkey 1999). The sampling will verify if current air emission estimates used in the permit application are correct and provide information for future air permit applications.« less
Tank 241-AZ-101 Mixer Pump Test Vapor Sampling and Analysis Plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
TEMPLETON, A.M.
2000-04-10
This sampling and analysis plan (SAP) identifies characterization objectives pertaining to sample collection, laboratory analytical evaluation, and reporting requirements for vapor samples obtained during the operation of mixer pumps in tank 241-AZ-101. The primary purpose of the mixer pump test (MPT) is to demonstrate that the two 300 horsepower mixer pumps installed in tank 241-AZ-101 can mobilize the settled sludge so that it can be retrieved for treatment and vitrification. Sampling will be performed in accordance with Tank 241-AZ-101 Mixer Pump Test Data Quality Objective (Banning 1999) and Data Quality Objectives for Regulatory Requirements for Hazardous and Radioactive Air Emissionsmore » Sampling and Analysis (Mulkey 1999). The sampling will verify if current air emission estimates used in the permit application are correct and provide information for future air permit applications.« less
The helical screw expander evaluation project. [for geothermal wells
NASA Technical Reports Server (NTRS)
Mckay, R. A.
1977-01-01
A positive-displacement helical-screw expander of the Lysholm type has been adapted for geothermal service and successfully demonstrated in a 50 kW prototype power system. Evaluation of the expander by tests of a new model in a 1 MW power system under wellhead conditions in selected liquid-dominated geothermal fields is proposed. The objectives are to determine the performance characteristics of the expander and power system over a broad range of operating conditions and also to examine the concept of wellhead power plants. Throttling and fractionation of the fluids from the test wells is planned to simulate a wide range of wellhead pressures and steam fractions. Variation in the expander exhaust pressure is also planned. The investigation will include expander efficiency, corrosion, erosion, scale formation and control, and endurance testing. Interaction studies with the wells and an electric grid are also proposed.
Müller, O; Barugahare, L; Schwartländer, B; Byaruhanga, E; Kataaha, P; Kyeyune, D; Heckmann, W; Ankrah, M
1992-08-01
To describe clients, operation and impact of an African public HIV testing and counselling centre. Analysis of samples from clients attending the AIDS Information Centre (AIC) in Kampala, Uganda in early 1991. HIV-1-positive and HIV-negative consecutive clients (250 of each), 86 consecutive couples, and 200 consecutive clients who were HIV-negative in 1990 and were attending for their repeat test. HIV seroprevalence rates, attitudes, behaviour and behaviour change. HIV-1 prevalence was 28% overall, 24% in men and 35% in women. Reasons for taking the HIV test were a planned marriage or a new relationship (27%; 84% in couples), to plan for the future (35%), distrust of sexual partner (14%) and illness or disease/death (not HIV-specific) of partner (20%). The majority of the reported intentions in response to a positive or a negative HIV test result were positive, demonstrating the ability to cope with this information. Of repeat clients, two (1%) had become HIV-1-positive. The majority of repeat clients reported one sexual partner only (67%) or sexual abstinence (25%). Compared with pre-test information from AIC clients attending for the first time, repeat clients reported casual sexual contacts less often (6 versus 25%) and, of those, the majority used condoms. Our study demonstrates the demand for and the feasibility of confidential HIV testing and counseling services in Uganda, and illustrates the value of these services in achieving behaviour changes. Such services should be considered an additional approach for the reduction of HIV transmission in Africa, especially in areas with high HIV seroprevalence rates.
Environmental restoration and waste management: Five-year plan, Fiscal Years 1992--1996
DOE Office of Scientific and Technical Information (OSTI.GOV)
Middleman, L.I.
1990-06-01
This document reflects DOE's fulfillment of a major commitment of the Environmental Restoration and Waste Management Five-Year Plan: reorganization to create an Office of Environmental Restoration and Waste Management (EM) responsible for the consolidated environmental management of nuclear-related facilities and sites formerly under the Assistant Secretaries for Defense Programs and Nuclear Energy and the Director of the Office of Energy Research. The purposes of this Plan for FY 1992--1996 are to measure progress in meeting DOE's compliance, cleanup, and waste management agenda; to incorporate a revised and condensed version of the Draft Research Development, Demonstration, Testing, and Evaluation (RDDT E)more » Plan (November 1989) to describe DOE's process for developing the new technologies critically needed to solve its environmental problems; to show DOE's current strategy and planned activities through FY 1996, including reasons for changes required to meet compliance and cleanup commitments; and to increase the involvement of other agencies and the public in DOE's planning.« less
Mission planning for space based satellite surveillance experiments with the MSX
NASA Technical Reports Server (NTRS)
Sridharan, R.; Fishman, T.; Robinson, E.; Viggh, H.; Wiseman, A.
1994-01-01
The Midcourse Space Experiment is a BMDO-sponsored scientific satellite set for launch within the year. The satellite will collect phenomenology data on missile targets, plumes, earth limb backgrounds and deep space backgrounds in the LWIR, visible and ultra-violet spectral bands. It will also conduct functional demonstrations for space-based space surveillance. The Space-Based Visible sensor, built by Lincoln Laboratory, Massachusetts Institute of Technology, is the primary sensor on board the MSX for demonstration of space surveillance. The SBV Processing, Operations and Control Center (SPOCC) is the mission planning and commanding center for all space surveillance experiments using the SBV and other MSX instruments. The guiding principle in the SPOCC Mission Planning System was that all routine functions be automated. Manual analyst input should be minimal. Major concepts are: (I) A high level language, called SLED, for user interface to the system; (2) A group of independent software processes which would generally be run in a pipe-line mode for experiment commanding but can be run independently for analyst assessment; (3) An integrated experiment cost computation function that permits assessment of the feasibility of the experiment. This paper will report on the design, implementation and testing of the Mission Planning System.
A Status of the Advanced Space Transportation Program from Planning to Action
NASA Technical Reports Server (NTRS)
Lyles, Garry; Griner, Carolyn
1998-01-01
A Technology Plan for Enabling Commercial Space Business was presented at the 48th International Astronautical Congress in Turin, Italy. This paper presents a status of the program's accomplishments. Technology demonstrations have progressed in each of the four elements of the program; (1) Low Cost Technology, (2) Advanced Reusable Technology, (3) Space Transfer Technology and (4) Space Transportation Research. The Low Cost Technology program element is primarily focused at reducing development and acquisition costs of aerospace hardware using a "design to cost" philosophy with robust margins, adapting commercial manufacturing processes and commercial off-the-shelf hardware. The attributes of this philosophy for small payload launch are being demonstrated at the component, sub-system, and system level. The X-34 "Fastrac" engine has progressed through major component and subsystem demonstrations. A propulsion system test bed has been implemented for system-level demonstration of component and subsystem technologies; including propellant tankage and feedlines, controls, pressurization, and engine systems. Low cost turbopump designs, commercial valves and a controller are demonstrating the potential for a ten-fold reduction in engine and propulsion system costs. The Advanced Reusable Technology program element is focused on increasing life through high strength-to-weight structures and propulsion components, highly integrated propellant tanks, automated checkout and health management and increased propulsion system performance. The validation of rocket based combined cycle (RBCC) propulsion is pro,-,ressing through component and subsystem testing. RBCC propulsion has the potential to provide performance margin over an all rocket system that could result in lower gross liftoff weight, a lower propellant mass fraction or a higher payload mass fraction. The Space Transfer Technology element of the program is pursuing technology that can improve performance and dramatically reduce the propellant and structural mass of orbit transfer and deep space systems. Flight demonstration of ion propulsion is progressing towards launch. Ion propulsion is the primary propulsion for Deep Space 1; a flyby of comet West-kohoutek-lkemura and asteroid 3352 McAuliffe. Testing of critical solar-thermal propulsion subsystems have been accomplished and planning is continuing for the flight demonstration of an electrodynamic tether orbit transfer system. The forth and final element of the program, Space Transportation Research, has progressed in several areas of propulsion research. This element of the program is focused at long-term (25 years) breakthrough concepts that could bring launch costs to a factor of one hundred below today's cost or dramatically expand planetary travel and enable interstellar travel.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Huang, L; Sarkar, V; Spiessens, S
2014-06-01
Purpose: The latest clinical implementation of the Siemens Artiste linac allows for delivery of modulated arcs (mARC) using full-field flattening filter free (FFF) photon beams. The maximum doserate of 2000 MU/min is well suited for high dose treatments such as SBRT. We tested and report on the performance of a prototype Eclipse TPS module supporting mARC capability on the Artiste platform. Method: our spine SBRT patients originally treated with 12/13 field static-gantry IMRT (SGIMRT) were chosen for this study. These plans were designed to satisfy RTOG0631 guidelines with a prescription of 16Gy in a single fraction. The cases were re-plannedmore » as mARC plans in the prototype Eclipse module using the 7MV FFF beam and required to satisfy RTOG0631 requirements. All plans were transferred from Eclipse, delivered on a Siemens Artiste linac and dose-validated using the Delta4 system. Results: All treatment plans were straightforwardly developed, in timely fashion, without challenge or inefficiency using the prototype module. Due to the limited number of segments in a single arc, mARC plans required 2-3 full arcs to yield plan quality comparable to SGIMRT plans containing over 250 total segments. The average (3%/3mm) gamma pass-rate for all arcs was 98.5±1.1%, thus demonstrating both excellent dose prediction by the AAA dose algorithm and excellent delivery fidelity. Mean delivery times for the mARC plans(10.5±1.7min) were 50-70% lower than the SGIMRT plans(26±2min), with both delivered at 2000 MU/min. Conclusion: A prototype Eclipse module capable of planning for Burst Mode modulated arc delivery on the Artiste platform has been tested and found to perform efficiently and accurately for treatment plan development and delivered-dose prediction. Further investigation of more treatment sites is being carried out and data will be presented.« less
Strategic Air Traffic Planning Using Eulerian Route Based Modeling and Optimization
NASA Astrophysics Data System (ADS)
Bombelli, Alessandro
Due to a soaring air travel growth in the last decades, air traffic management has become increasingly challenging. As a consequence, planning tools are being devised to help human decision-makers achieve a better management of air traffic. Planning tools are divided into two categories, strategic and tactical. Strategic planning generally addresses a larger planning domain and is performed days to hours in advance. Tactical planning is more localized and is performed hours to minutes in advance. An aggregate route model for strategic air traffic flow management is presented. It is an Eulerian model, describing the flow between cells of unidirectional point-to-point routes. Aggregate routes are created from flight trajectory data based on similarity measures. Spatial similarity is determined using the Frechet distance. The aggregate routes approximate actual well-traveled traffic patterns. By specifying the model resolution, an appropriate balance between model accuracy and model dimension can be achieved. For a particular planning horizon, during which weather is expected to restrict the flow, a procedure for designing airborne reroutes and augmenting the traffic flow model is developed. The dynamics of the traffic flow on the resulting network take the form of a discrete-time, linear time-invariant system. The traffic flow controls are ground holding, pre-departure rerouting and airborne rerouting. Strategic planning--determining how the controls should be used to modify the future traffic flow when local capacity violations are anticipated--is posed as an integer programming problem of minimizing a weighted sum of flight delays subject to control and capacity constraints. Several tests indicate the effectiveness of the modeling and strategic planning approach. In the final, most challenging, test, strategic planning is demonstrated for the six western-most Centers of the 22-Center national airspace. The planning time horizon is four hours long, and there is weather predicted that causes significant delays to the scheduled flights. Airborne reroute options are computed and added to the route model, and it is shown that the predicted delays can be significantly reduced. The test results also indicate the computational feasibility of the approach for a planning problem of this size.
DOT National Transportation Integrated Search
2012-04-01
This report presents the Transit System Data Test Plan for the national evaluation of the Los Angeles Congestion Reduction Demonstration (Metro ExpressLanes) under the United States Department of Transportation (U.S. DOT) Congestion Reduction Demonst...
Code of Federal Regulations, 2014 CFR
2014-07-01
... procedures in the plan. (2) You have certified in your performance test report that the system operated... EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS FOR SOURCE CATEGORIES (CONTINUED) National Emission Standards for Hazardous Air Pollutants for Iron and Steel Foundries Initial Compliance Requirements § 63...
Code of Federal Regulations, 2011 CFR
2011-07-01
... procedures in the plan. (2) You have certified in your performance test report that the system operated... EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS FOR SOURCE CATEGORIES (CONTINUED) National Emission Standards for Hazardous Air Pollutants for Iron and Steel Foundries Initial Compliance Requirements § 63...
Code of Federal Regulations, 2010 CFR
2010-07-01
... procedures in the plan. (2) You have certified in your performance test report that the system operated... EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS FOR SOURCE CATEGORIES (CONTINUED) National Emission Standards for Hazardous Air Pollutants for Iron and Steel Foundries Initial Compliance Requirements § 63...
California Education: Planning for a Better Future
ERIC Educational Resources Information Center
Larsen, Eric; Weston, Margaret
2011-01-01
Proficiency rates among California students continue to rise. At the end of the 2009-10 school year, the share of students who demonstrated proficiency on the California Standards Test was greater than 50 percent in both English language arts (ELA) and math. California's proficiency rates have increased more than 18 percentage points over the last…
Bureau of Land Management density management study.
John Cissel; Paul Anderson; Shanti Berryman; Sam Chan; Deanna Olson; Klaus Puettman
2004-01-01
The Bureau of Land Management (BLM), Pacific Northwest Research Station (PNW), U.S. Geological Survey (USGS), and Oregon State University (OSU) established the Density Management Study (DMS) in 1994 to develop and test options for young stand management to meet Northwest Forest Plan objectives in western Oregon. The DMS demonstrates and evaluates alternative approaches...
Designing User Manuals for the Online Public Access Catalog.
ERIC Educational Resources Information Center
Seiden, Peggy; Sullivan, Patricia
1986-01-01
Describes the process of developing and revising a brochure to guide library patrons in conducting an author search on an online public access catalog in order to demonstrate the application of four steps in production of a functional document--analysis; planning; development; evaluation, testing, and revision. Three sources are given. (EJS)
An overview of the EASE/ACCESS space construction demonstration
NASA Technical Reports Server (NTRS)
Levin, George M.; Ross, Jerry L.; Spring, Sherwood C.
1988-01-01
Consideration is given to the development of the Experimental Assembly of Structures in EVA/Assembly Concept for Construction of Erectable Space Structures (EASE/ACCESS) space construction demonstration, which was performed during Space Shuttle mission 61-B. The mission equipment is described and illustrated and the EASE/ACCESS mission management structure is outlined. Simulations of the assembly and disassembly in the NASA neutral buoyancy simulators were used to test the mission plans. In addition, EVA training and crew performance for the mission are discussed.
2018-02-28
On February 28, SpaceX completed a demonstration of their ability to recover the crew and capsule after a nominal water splashdown. This marks an important recovery milestone and joint test. The timeline requirement from splashdown to crew egress onboard the ship is one hour, and the recovery team demonstrated that they can accomplish this operation under worst-case conditions in under 45 minutes. Further improvements are planned to shorten the recovery time even more as the team works to build a process that is safe, repeatable, and efficient.
NASA Technical Reports Server (NTRS)
Horvath, Thomas; Splinter, Scott; Daryabeigi, Kamran; Wood, William; Schwartz, Richard; Ross, Martin
2008-01-01
High resolution calibrated infrared imagery of vehicles during hypervelocity atmospheric entry or sustained hypersonic cruise has the potential to provide flight data on the distribution of surface temperature and the state of the airflow over the vehicle. In the early 1980 s NASA sought to obtain high spatial resolution infrared imagery of the Shuttle during entry. Despite mission execution with a technically rigorous pre-planning capability, the single airborne optical system for this attempt was considered developmental and the scientific return was marginal. In 2005 the Space Shuttle Program again sponsored an effort to obtain imagery of the Orbiter. Imaging requirements were targeted towards Shuttle ascent; companion requirements for entry did not exist. The engineering community was allowed to define observation goals and incrementally demonstrate key elements of a quantitative spatially resolved measurement capability over a series of flights. These imaging opportunities were extremely beneficial and clearly demonstrated capability to capture infrared imagery with mature and operational assets of the US Navy and the Missile Defense Agency. While successful, the usefulness of the imagery was, from an engineering perspective, limited. These limitations were mainly associated with uncertainties regarding operational aspects of data acquisition. These uncertainties, in turn, came about because of limited pre-flight mission planning capability, a poor understanding of several factors including the infrared signature of the Shuttle, optical hardware limitations, atmospheric effects and detector response characteristics. Operational details of sensor configuration such as detector integration time and tracking system algorithms were carried out ad hoc (best practices) which led to low probability of target acquisition and detector saturation. Leveraging from the qualified success during Return-to-Flight, the NASA Engineering and Safety Center sponsored an assessment study focused on increasing the probability of returning spatially resolved scientific/engineering thermal imagery. This paper provides an overview of the assessment task and the systematic approach designed to establish confidence in the ability of existing assets to reliably acquire, track and return global quantitative surface temperatures of the Shuttle during entry. A discussion of capability demonstration in support of a potential Shuttle boundary layer transition flight test is presented. Successful demonstration of a quantitative, spatially resolved, global temperature measurement on the proposed Shuttle boundary layer transition flight test could lead to potential future applications with hypersonic flight test programs within the USAF and DARPA along with flight test opportunities supporting NASA s project Constellation.
Fiberoptic characteristics for extreme operating environments
NASA Technical Reports Server (NTRS)
Delcher, R. C.
1992-01-01
Fiberoptics could offer several major benefits for cryogenic liquid-fueled rocket engines, including lightning immunity, weight reduction, and the possibility of implementing a number of new measurements for engine condition monitoring. The technical feasibility of using fiberoptics in the severe environments posed by cryogenic liquid-fueled rocket engines was determined. The issues of importance and subsequent requirements for this use of fiberoptics were compiled. These included temperature ranges, moisture embrittlement succeptability, and the ability to withstand extreme shock and vibration levels. Different types of optical fibers were evaluated and several types of optical fibers' ability to withstand use in cryogenic liquid-fueled rocket engines was demonstrated through environmental testing of samples. This testing included: cold-bend testing, moisture embrittlement testing, temperature cycling, temperature extremes testing, vibration testing, and shock testing. Three of five fiber samples withstood the tests to a level proving feasibility, and two of these remained intact in all six of the tests. A fiberoptic bundle was also tested, and completed testing without breakage. Preliminary cabling and harnessing for fiber protection was also demonstrated. According to cable manufacturers, the successful -300 F cold bend, vibration, and shock tests are the first instance of any major fiberoptic cable testing below roughly -55 F. This program has demonstrated the basic technical feasibility of implementing optical fibers on cryogenic liquid-fueled rocket engines, and a development plan is included highlighting requirements and issues for such an implementation.
Hawkins, Carlee Beth; Nosek, Brian A
2012-11-01
Reporting an Independent political identity does not guarantee the absence of partisanship. Independents demonstrated considerable variability in relative identification with Republicans versus Democrats as measured by an Implicit Association Test (IAT; M = 0.10, SD = 0.47). To test whether this variation predicted political judgment, participants read a newspaper article describing two competing welfare (Study 1) or special education (Study 2) policies. The authors manipulated which policy was proposed by which party. Among self-proclaimed Independents, those who were implicitly Democratic preferred the liberal welfare plan, and those who were implicitly Republican preferred the conservative welfare plan. Regardless of the policy details, these implicit partisans preferred the policy proposed by "their" party, and this effect occurred more strongly for implicit than explicit plan preference. The authors suggest that implicitly partisan Independents may consciously override some partisan influence when making explicit political judgments, and Independents may identify as such to appear objective even when they are not.
Conceptual design study of a Harrier V/STOL research aircraft
NASA Technical Reports Server (NTRS)
Bode, W. E.; Berger, R. L.; Elmore, G. A.; Lacey, T. R.
1978-01-01
MCAIR recently completed a conceptual design study to define modification approaches to, and derive planning prices for the conversion of a two place Harrier to a V/STOL control, display and guidance research aircraft. Control concepts such as rate damping, attitude stabilization, velocity command, and cockpit controllers are to be demonstrated. Display formats will also be investigated, and landing, navigation and guidance systems flight tested. The rear cockpit is modified such that it can be quickly adapted to faithfully simulate the controls, displays and handling qualities of a Type A or Type B V/STOL. The safety pilot always has take command capability. The modifications studied fall into two categories: basic modifications and optional modifications. Technical descriptions of the basic modifications and of the optional modifications are presented. The modification plan and schedule as well as the test plan and schedule are presented. The failure mode and effects analysis, aircraft performance, aircraft weight, and aircraft support are discussed.
2006-06-01
scenarios. The demonstration planned for May 2006, in Chiang Mai , Thailand, will have a first-responder, law enforcement, and counter-terrorism and counter...to local ( Chiang Mai ), theater (Bangkok), and global (Alameda, California) command and control centers. This fusion of information validates using...network performance to be tested during moderate environmental conditions. The third and fourth scenarios were conducted in Chiang Mai , Thailand
Assessment of statistical significance and clinical relevance.
Kieser, Meinhard; Friede, Tim; Gondan, Matthias
2013-05-10
In drug development, it is well accepted that a successful study will demonstrate not only a statistically significant result but also a clinically relevant effect size. Whereas standard hypothesis tests are used to demonstrate the former, it is less clear how the latter should be established. In the first part of this paper, we consider the responder analysis approach and study the performance of locally optimal rank tests when the outcome distribution is a mixture of responder and non-responder distributions. We find that these tests are quite sensitive to their planning assumptions and have therefore not really any advantage over standard tests such as the t-test and the Wilcoxon-Mann-Whitney test, which perform overall well and can be recommended for applications. In the second part, we present a new approach to the assessment of clinical relevance based on the so-called relative effect (or probabilistic index) and derive appropriate sample size formulae for the design of studies aiming at demonstrating both a statistically significant and clinically relevant effect. Referring to recent studies in multiple sclerosis, we discuss potential issues in the application of this approach. Copyright © 2012 John Wiley & Sons, Ltd.
Final Technical Report: Development of Post-Installation Monitoring Capabilities
DOE Office of Scientific and Technical Information (OSTI.GOV)
Polagye, Brian
2014-03-31
The development of approaches to harness marine and hydrokinetic energy at large-scale is predicated on the compatibility of these generation technologies with the marine environment. At present, aspects of this compatibility are uncertain. Demonstration projects provide an opportunity to address these uncertainties in a way that moves the entire industry forward. However, the monitoring capabilities to realize these advances are often under-developed in comparison to the marine and hydrokinetic energy technologies being studied. Public Utility District No. 1 of Snohomish County has proposed to deploy two 6-meter diameter tidal turbines manufactured by OpenHydro in northern Admiralty Inlet, Puget Sound, Washington.more » The goal of this deployment is to provide information about the environmental, technical, and economic performance of such turbines that can advance the development of larger-scale tidal energy projects, both in the United States and internationally. The objective of this particular project was to develop environmental monitoring plans in collaboration with resource agencies, while simultaneously advancing the capabilities of monitoring technologies to the point that they could be realistically implemented as part of these plans. In this, the District was joined by researchers at the Northwest National Marine Renewable Energy Center at the University of Washington, Sea Mammal Research Unit, LLC, H.T. Harvey & Associates, and Pacific Northwest National Laboratory. Over a two year period, the project team successfully developed four environmental monitoring and mitigation plans that were adopted as a condition of the operating license for the demonstration project that issued by the Federal Energy Regulatory Commission in March 2014. These plans address nearturbine interactions with marine animals, the sound produced by the turbines, marine mammal behavioral changes associated with the turbines, and changes to benthic habitat associated with colonization of the subsea base support structure. In support of these plans, the project team developed and field tested a strobe-illuminated stereooptical camera system suitable for studying near-turbine interactions with marine animals. The camera system underwent short-term field testing at the proposed turbine deployment site and a multi-month endurance test in shallower water to evaluate the effectiveness of biofouling mitigation measures for the optical ports on camera and strobe pressure housings. These tests demonstrated that the camera system is likely to meet the objectives of the near-turbine monitoring plan and operate, without maintenance, for periods of at least three months. The project team also advanced monitoring capabilities related to passive acoustic monitoring of marine mammals and monitoring of tidal currents. These capabilities will be integrated in a recoverable monitoring package that has a single interface point with the OpenHydro turbines, connects to shore power and data via a wet-mate connector, and can be recovered to the surface for maintenance and reconfiguration independent of the turbine. A logical next step would be to integrate these instruments within the package, such that one instrument can trigger the operation of another.« less
Experimental Results From a 2kW Brayton Power Conversion Unit
NASA Technical Reports Server (NTRS)
Hervol, David; Mason, Lee; Birchenough, Arthur
2003-01-01
This paper presents experimental test results from operation of a 2 kWe Brayton power conversion unit. The Brayton converter was developed for a solar dynamic power system flight experiment planned for the Mir Space Station in 1997. The flight experiment was cancelled, but the converter was tested at Glenn Research Center as part of the Solar Dynamic Ground Test Demonstration system which included a solar concentrator, heat receiver, and space radiator. In preparation for the current testing, the heat receiver was removed and replaced with an electrical resistance heater, simulating the thermal input of a steady-state nuclear source. The converter was operated over a full range of thermal input power levels and rotor speeds to generate an overall performance map. The converter unit will serve as the centerpiece of a Nuclear Electric Propulsion Testbed at Glenn. Future potential uses for the Testbed include high voltage electrical controller development, integrated electric thruster testing and advanced radiator demonstration testing to help guide high power Brayton technology development for Nuclear Electric Propulsion (NEP).
Hypersonic Inflatable Aerodynamic Decelerator (HIAD) Technology Development Overview
NASA Technical Reports Server (NTRS)
Hughes, Stephen J.; Cheatwood, F. McNeil; Calomino, Anthony M.; Wright, Henry S.
2013-01-01
The successful flight of the Inflatable Reentry Vehicle Experiment (IRVE)-3 has further demonstrated the potential value of Hypersonic Inflatable Aerodynamic Decelerator (HIAD) technology. This technology development effort is funded by NASA's Space Technology Mission Directorate (STMD) Game Changing Development Program (GCDP). This paper provides an overview of a multi-year HIAD technology development effort, detailing the projects completed to date and the additional testing planned for the future. The effort was divided into three areas: Flexible Systems Development (FSD), Mission Advanced Entry Concepts (AEC), and Flight Validation. FSD consists of a Flexible Thermal Protection Systems (FTPS) element, which is investigating high temperature materials, coatings, and additives for use in the bladder, insulator, and heat shield layers; and an Inflatable Structures (IS) element which includes manufacture and testing (laboratory and wind tunnel) of inflatable structures and their associated structural elements. AEC consists of the Mission Applications element developing concepts (including payload interfaces) for missions at multiple destinations for the purpose of demonstrating the benefits and need for the HIAD technology as well as the Next Generation Subsystems element. Ground test development has been pursued in parallel with the Flight Validation IRVE-3 flight test. A larger scale (6m diameter) HIAD inflatable structure was constructed and aerodynamically tested in the National Full-scale Aerodynamics Complex (NFAC) 40ft by 80ft test section along with a duplicate of the IRVE-3 3m article. Both the 6m and 3m articles were tested with instrumented aerodynamic covers which incorporated an array of pressure taps to capture surface pressure distribution to validate Computational Fluid Dynamics (CFD) model predictions of surface pressure distribution. The 3m article also had a duplicate IRVE-3 Thermal Protection System (TPS) to test in addition to testing with the Aerocover configuration. Both the Aerocovers and the TPS were populated with high contrast targets so that photogrammetric solutions of the loaded surface could be created. These solutions both refined the aerodynamic shape for CFD modeling and provided a deformed shape to validate structural Finite Element Analysis (FEA) models. Extensive aerothermal testing has been performed on the TPS candidates. This testing has been conducted in several facilities across the country. The majority of the testing has been conducted in the Boeing Large Core Arc Tunnel (LCAT). HIAD is continuing to mature testing methodology in this facility and is developing new test sample fixtures and control methodologies to improve understanding and quality of the environments to which the samples are subjected. Additional testing has been and continues to be performed in the NASA LaRC 8ft High Temperature Tunnel, where samples up to 2ft by 2ft are being tested over representative underlying structures incorporating construction features such as sewn seams and through-thickness quilting. With the successful completion to the IRVE-3 flight demonstration, mission planning efforts are ramping up on the development of the HIAD Earth Atmospheric Reenty Test (HEART) which will demonstrate a relevant scale vehicle in relevant environments via a large-scale aeroshell (approximately 8.5m) entering at orbital velocity (approximately 7km/sec) with an entry mass on the order of 4MT. Also, the Build to Print (BTP) hardware built as a risk mitigation for the IRVE-3 project to have a "spare" ready to go in the event of a launch vehicle delivery failure is now available for an additional sub-orbital flight experiment. Mission planning is underway to define a mission that can utilize this existing hardware and help the HIAD project further mature this technology.
NASA Technical Reports Server (NTRS)
Cosentino, Gary B.
2008-01-01
The Joint Unmanned Combat Air Systems (J-UCAS) program is a collaborative effort between the Defense Advanced Research Project Agency (DARPA), the US Air Force (USAF) and the US Navy (USN). Together they have reviewed X-45A flight test site processes and personnel as part of a system demonstration program for the UCAV-ATD Flight Test Program. The goal was to provide a disciplined controlled process for system integration and testing and demonstration flight tests. NASA's Dryden Flight Research Center (DFRC) acted as the project manager during this effort and was tasked with the responsibilities of range and ground safety, the provision of flight test support and infrastructure and the monitoring of technical and engineering tasks. DFRC also contributed their engineering knowledge through their contributions in the areas of autonomous ground taxi control development, structural dynamics testing and analysis and the provision of other flight test support including telemetry data, tracking radars, and communications and control support equipment. The Air Force Flight Test Center acted at the Deputy Project Manager in this effort and was responsible for the provision of system safety support and airfield management and air traffic control services, among other supporting roles. The T-33 served as a J-UCAS surrogate aircraft and demonstrated flight characteristics similar to that of the the X-45A. The surrogate served as a significant risk reduction resource providing mission planning verification, range safety mission assessment and team training, among other contributions.
Revalidation of the NASA Ames 11-by 11-Foot Transonic Wind Tunnel with a Commercial Airplane Model
NASA Technical Reports Server (NTRS)
Kmak, Frank J.; Hudgins, M.; Hergert, D.; George, Michael W. (Technical Monitor)
2001-01-01
The 11-By 11-Foot Transonic leg of the Unitary Plan Wind Tunnel (UPWT) was modernized to improve tunnel performance, capability, productivity, and reliability. Wind tunnel tests to demonstrate the readiness of the tunnel for a return to production operations included an Integrated Systems Test (IST), calibration tests, and airplane validation tests. One of the two validation tests was a 0.037-scale Boeing 777 model that was previously tested in the 11-By 11-Foot tunnel in 1991. The objective of the validation tests was to compare pre-modernization and post-modernization results from the same airplane model in order to substantiate the operational readiness of the facility. Evaluation of within-test, test-to-test, and tunnel-to-tunnel data repeatability were made to study the effects of the tunnel modifications. Tunnel productivity was also evaluated to determine the readiness of the facility for production operations. The operation of the facility, including model installation, tunnel operations, and the performance of tunnel systems, was observed and facility deficiency findings generated. The data repeatability studies and tunnel-to-tunnel comparisons demonstrated outstanding data repeatability and a high overall level of data quality. Despite some operational and facility problems, the validation test was successful in demonstrating the readiness of the facility to perform production airplane wind tunnel%, tests.
Zhou, Guiyun; Stoltzfus, Jill C; Houldin, Arlene D; Parks, Susan M; Swan, Beth Ann
2010-11-01
To establish initial reliability and validity of a Web-based survey focused on oncology advanced practice nurses' (APNs') knowledge, attitudes, and practice behaviors regarding advanced care planning, and to obtain preliminary understanding of APNs' knowledge, attitudes, and practice behaviors and perceived barriers to advanced care planning. Descriptive, cross-sectional, pilot survey study. The eastern United States. 300 oncology APNs. Guided by the Theory of Planned Behavior, a knowledge, attitudes, and practice behaviors survey was developed and reviewed for content validity. The survey was distributed to 300 APNs via e-mail and sent again to the 89 APNs who responded to the initial survey. Exploratory factor analysis was used to examine the construct validity and test-retest reliability of the survey's attitudinal and practice behavior portions. Respondents' demographics, knowledge, attitudes, practice behaviors, and perceived barriers to advanced care planning practice. Exploratory factor analysis yielded a five-factor solution from the survey's attitudes and practice behavior portions with internal consistency using Cronbach alpha. Respondents achieved an average of 67% correct answers in the 12-item knowledge section and scored positively in attitudes toward advanced care planning. Their practice behavior scores were marginally positive. The most common reported barriers were from patients' and families' as well as physicians' reluctance to discuss advanced care planning. The attitudinal and practice behaviors portions of the survey demonstrated preliminary construct validity and test-retest reliability. Regarding advanced care planning, respondents were moderately knowledgeable, but their advanced care planning practice was not routine. Validly assessing oncology APNs' knowledge, attitudes, and practice behaviors regarding advanced care planning will enable more tailored approaches to improve end-of-life care outcomes.
Development of a verification program for deployable truss advanced technology
NASA Technical Reports Server (NTRS)
Dyer, Jack E.
1988-01-01
Use of large deployable space structures to satisfy the growth demands of space systems is contingent upon reducing the associated risks that pervade many related technical disciplines. The overall objectives of this program was to develop a detailed plan to verify deployable truss advanced technology applicable to future large space structures and to develop a preliminary design of a deployable truss reflector/beam structure for use a a technology demonstration test article. The planning is based on a Shuttle flight experiment program using deployable 5 and 15 meter aperture tetrahedral truss reflections and a 20 m long deployable truss beam structure. The plan addresses validation of analytical methods, the degree to which ground testing adequately simulates flight and in-space testing requirements for large precision antenna designs. Based on an assessment of future NASA and DOD space system requirements, the program was developed to verify four critical technology areas: deployment, shape accuracy and control, pointing and alignment, and articulation and maneuvers. The flight experiment technology verification objectives can be met using two shuttle flights with the total experiment integrated on a single Shuttle Test Experiment Platform (STEP) and a Mission Peculiar Experiment Support Structure (MPESS). First flight of the experiment can be achieved 60 months after go-ahead with a total program duration of 90 months.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Rule, K.; Scott, J.; Larson, S.
1995-12-31
The Tokamak Fusion Test Reactor (TFTR) is a one-of-a kind tritium fusion research reactor, and is planned to be decommissioned within the next several years. This is the largest fusion reactor in the world and as a result of deuterium-tritum reactions is tritium contaminated and activated from 14 Mev neutrons. This presents many unusual challenges when dismantling, packaging and disposing its components and ancillary systems. Special containers are being designed to accommodate the vacuum vessel, neutral beams, and tritium delivery and processing systems. A team of experienced professionals performed a detailed field study to evaluate the requirements and appropriate methodsmore » for packaging the radioactive materials. This team focused on several current and innovative methods for waste minimization that provides the oppurtunmost cost effective manner to package and dispose of the waste. This study also produces a functional time-phased schedule which conjoins the waste volume, weight, costs and container requirements with the detailed project activity schedule for the entire project scope. This study and project will be the first demonstration of the decommissioning of a tritium fusion test reactor. The radioactive waste disposal aspects of this project are instrumental in demonstrating the viability of a fusion power reactor with regard to its environmental impact and ultimate success.« less
Field Test to Evaluate Deep Borehole Disposal.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hardin, Ernest; Brady, Patrick Vane.; Clark, Andrew Jordan
The U.S. Department of Energy (DOE) has embarked on the Deep Borehole Field Test (DBFT), which will investigate whether conditions suitable for disposal of radioactive waste can be found at a depth of up to 5 km in the earth’s crust. As planned, the DBFT will demonstrate drilling and construction of two boreholes, one for initial scientific characterization, and the other at a larger diameter such as could be appropriate for waste disposal (the DBFT will not involve radioactive waste). A wide range of geoscience activities is planned for the Characterization Borehole, and an engineering demonstration of test package emplacementmore » and retrieval is planned for the larger Field Test Borehole. Characterization activities will focus on measurements and samples that are important for evaluating the long-term isolation capability of the Deep Borehole Disposal (DBD) concept. Engineering demonstration activities will focus on providing data to evaluate the concept’s operational safety and practicality. Procurement of a scientifically acceptable DBFT site and a site management contractor is now underway. The concept of deep borehole disposal (DBD) for radioactive wastes is not new. It was considered by the National Academy of Science (NAS 1957) for liquid waste, studied in the 1980’s in the U.S. (Woodward–Clyde 1983), and has been evaluated by European waste disposal R&D programs in the past few decades (for example, Grundfelt and Crawford 2014; Grundfelt 2010). Deep injection of wastewater including hazardous wastes is ongoing in the U.S. and regulated by the Environmental Protection Agency (EPA 2001). The DBFT is being conducted with a view to use the DBD concept for future disposal of smaller-quantity, DOE-managed wastes from nuclear weapons production (i.e., Cs/Sr capsules and granular solid wastes). However, the concept may also have broader applicability for nations that have a need to dispose of limited amounts of spent fuel from nuclear power reactors. For such nations the cost for disposing of volumetrically limited waste streams could be lower than mined geologic repositories.« less
NARC Rayon Replacement Program for the RSRM Nozzle, Phase IV Qualification and Implementation Status
NASA Technical Reports Server (NTRS)
Haddock, M. Reed; Wendel, Gary M.; Cook, Roger V.
2005-01-01
The Space Shuttle NARC Rayon Replacement Program has down-selected Enka rayon as a replacement for the obsolete NARC rayon in the nozzle carbon cloth phenolic (CCP) ablative insulators. Full qualification testing of the Enka rayon-based carbon cloth phenolic is underway, including processing, thmal/structural properties, and hot-fire subscale tests. Required thermal-structural capabilities, together with confidence in erosio/char performance in simulated and subscale hot fire tests such as Wright-Patterson Air Force Base Laser Hardened Materials Evaluation Laboratory testing, NASA-MSFC 24-inch motor tests, NASA-MSFC Solid Fuel Torch - Super Sonic Blast Tube, NASA-MSFC Plasma Torch Test Bed, ATK Thiokol Forty Pound Charge and NASA-MSFC MNASA justified the testing of the new Enka-rayon candidate on full-scale static test motors. The first RSRM full-scale static test motor nozzle, fabricated using the new Enka rayon-based CCP, was successfully demonstrated in June 2004. Two additional static test motors are planned with the new Enka rayon in the next two years along with additional A-basis property characterization. Process variation or "corner-of-the-box" testing together with cured and uncured aging studies are also planned as some of the pre-flight implementation activities with 5-year cured aging studies over-lapping flight hardware fabrication.
Opals: Mission System Operations Architecture for an Optical Communications Demonstration on the ISS
NASA Technical Reports Server (NTRS)
Abrahamson, Matthew J.; Sindiy, Oleg V.; Oaida, Bogdan V.; Fregoso, Santos; Bowles-Martinez, Jessica N.; Kokorowski, Michael; Wilkerson, Marcus W.; Konyha, Alexander L.
2014-01-01
In April of 2014, the Optical PAyload for Lasercomm Science (OPALS) Flight System (FS) launched to the International Space Station (ISS) to demonstrate space-to-ground optical communications. During a planned 90-day baseline mission, the OPALS FS will downlink high quality, short duration videos to the Optical Communications Telescope Laboratory (OCTL) ground station in Wrightwood, California. Interfaces to the ISS payload operations infrastructure have been established to facilitate activity planning, hazardous laser operations, commanding, and telemetry transmission. In addition, internal processes, such as pointing prediction and data processing, satisfy the technical requirements of the mission. The OPALS operations team participates in Operational Readiness Tests (ORTs) with external partners to exercise coordination processes and train for the overall mission. The ORTs have provided valuable insight into operational considerations for the instrument on the ISS.
Nickel hydrogen low Earth orbit life testing
NASA Technical Reports Server (NTRS)
Badcock, C. C.; Haag, R. L.
1986-01-01
A program to demonstrate the long term reliability of NiH2 cells in low Earth orbits (LEO) and support use in mid-altitude orbits (MAO) was initiated. Both 3.5 and 4.5 inch diameter nickel hydrogen cells are included in the test plan. Cells from all U.S. vendors are to be tested. The tests will be performed at -5 and 10 C at 40 and 60% DOD for LEO orbit and 10 C and 80% DOD for MAO orbit simulations. The goals of the testing are 20,000 cycles at 60% DOD and 30,000 cycles at 40% DOD. Cells are presently undergoing acceptance and characterization testing at Naval Weapons Systems Center, Crane.
Simulation of Watts Bar Unit 1 Initial Startup Tests with Continuous Energy Monte Carlo Methods
DOE Office of Scientific and Technical Information (OSTI.GOV)
Godfrey, Andrew T; Gehin, Jess C; Bekar, Kursat B
2014-01-01
The Consortium for Advanced Simulation of Light Water Reactors* is developing a collection of methods and software products known as VERA, the Virtual Environment for Reactor Applications. One component of the testing and validation plan for VERA is comparison of neutronics results to a set of continuous energy Monte Carlo solutions for a range of pressurized water reactor geometries using the SCALE component KENO-VI developed by Oak Ridge National Laboratory. Recent improvements in data, methods, and parallelism have enabled KENO, previously utilized predominately as a criticality safety code, to demonstrate excellent capability and performance for reactor physics applications. The highlymore » detailed and rigorous KENO solutions provide a reliable nu-meric reference for VERAneutronics and also demonstrate the most accurate predictions achievable by modeling and simulations tools for comparison to operating plant data. This paper demonstrates the performance of KENO-VI for the Watts Bar Unit 1 Cycle 1 zero power physics tests, including reactor criticality, control rod worths, and isothermal temperature coefficients.« less
Phase 1 Space Fission Propulsion System Testing and Development Progress
NASA Technical Reports Server (NTRS)
VanDyke, Melissa; Houts, Mike; Godfroy, Tom; Dickens, Ricky; Poston, David; Kapernick, Rick; Reid, Bob; Salvail, Pat; Ring, Peter; Schafer, Charles (Technical Monitor)
2001-01-01
Successful development of space fission systems requires an extensive program of affordable and realistic testing. In addition to tests related to design/development of the fission system, realistic testing of the actual flight unit must also be performed. If the system is designed to operate within established radiation damage and fuel burn up limits while simultaneously being designed to allow close simulation of heat from fission using resistance heaters, high confidence in fission system performance and lifetime can be attained through a series of non-nuclear tests. The Safe Affordable Fission Engine (SAFE) test series, whose ultimate goal is the demonstration of a 300 kW flight configuration system, has demonstrated that realistic testing can be performed using non-nuclear methods. This test series, carried out in collaboration with other NASA centers, other government agencies, industry, and universities, successfully completed a testing program with a 30 kWt core, Stirling engine, and ion engine configuration. Additionally, a 100 kWt core is in fabrication and appropriate test facilities are being reconfigured. This paper describes the current SAFE non-nuclear tests, which includes test article descriptions, test results and conclusions, and future test plans.
An educational strategy for treating chronic, noncancer pain with opioids: a pilot test.
Elhwairis, Huda; Reznich, Christopher B
2010-12-01
Chronic pain is common and can be devastating to the patient and challenging to the health care provider. Despite the importance of the topic, pain management curricula are incomplete in health professionals' training. We developed a longitudinal curriculum to teach therapy for chronic noncancer pain over four units and pilot-tested the teaching of one unit (opioids) to internal medicine residents. The educational strategies we used included didactic sessions, write-up of a management plan following a model, case discussions, and role-play group activities. We pilot-tested one unit (opioid therapy) in March 2008. We performed learner evaluations, using a pretest and posttest, a write-up plan following a model, and a learner knowledge questionnaire. Results showed significant improvement in knowledge. Residents found the sessions and educational strategy to be excellent and reported higher confidence levels in managing patients with chronic noncancer pain. This article demonstrates that multiple teaching modalities-including didactic lectures, case discussions, write-up of a management plan following a model, and role-play group activities-are effective methods of teaching internal medicine residents how to use opioids to manage chronic noncancer pain. Copyright © 2010 American Pain Society. Published by Elsevier Inc. All rights reserved.
Evaluation of the ESRD Managed Care Demonstration Operations
Oppenheimer, Caitlin Carroll; Shapiro, Jennifer R.; Beronja, Nancy; Dykstra, Dawn M.; Gaylin, Daniel S.; Held, Philip J.; Rubin, Robert J.
2003-01-01
Individuals with end stage renal disease (ESRD), most of whom are insured by Medicare, are generally prohibited from enrolling in Medicare managed care plans (MCPs). CMS offered ESRD patients the opportunity to participate in an ESRD managed care demonstration mandated by Congress. The demonstration tested whether managed care systems would be of interest to ESRD patients and whether these approaches would be operationally feasible and efficient for treating ESRD patients. This article examines the structure, implementation, and operational outcomes of the three demonstration sites, focusing on: the structure of these managed care programs for ESRD patients, requirements needed to attract and enroll patients, and the challenges of introducing managed care programs in the ESRD arena. PMID:14628397
Resource analysis applications in Michigan. [NASA remote sensing
NASA Technical Reports Server (NTRS)
Schar, S. W.; Enslin, W. R.; Sattinger, I. J.; Robinson, J. G.; Hosford, K. R.; Fellows, R. S.; Raad, J. H.
1974-01-01
During the past two years, available NASA imagery has been applied to a broad spectrum of problems of concern to Michigan-based agencies. These demonstrations include the testing of remote sensing for the purposes of (1) highway corridor planning and impact assessments, (2) game management-area information bases, (3) multi-agency river basin planning, (4) timber resource management information systems, (5) agricultural land reservation policies, and (6) shoreline flooding damage assessment. In addition, cost accounting procedures have been developed for evaluating the relative costs of utilizing remote sensing in land cover and land use analysis data collection procedures.
The space shuttle payload planning working groups. Volume 7: Earth observations
NASA Technical Reports Server (NTRS)
1973-01-01
The findings of the Earth Observations working group of the space shuttle payload planning activity are presented. The objectives of the Earth Observation experiments are: (1) establishment of quantitative relationships between observable parameters and geophysical variables, (2) development, test, calibration, and evaluation of eventual flight instruments in experimental space flight missions, (3) demonstration of the operational utility of specific observation concepts or techniques as information inputs needed for taking actions, and (4) deployment of prototype and follow-on operational Earth Observation systems. The basic payload capability, mission duration, launch sites, inclinations, and payload limitations are defined.
Hyper-X Research Vehicle (HXRV) Experimental Aerodynamics Test Program Overview
NASA Technical Reports Server (NTRS)
Holland, Scott D.; Woods, William C.; Engelund, Walter C.
2000-01-01
This paper provides an overview of the experimental aerodynamics test program to ensure mission success for the autonomous flight of the Hyper-X Research Vehicle (HXRV). The HXRV is a 12-ft long, 2700 lb lifting body technology demonstrator designed to flight demonstrate for the first time a fully airframe integrated scramjet propulsion system. Three flights are currently planned, two at Mach 7 and one at Mach 10, beginning in the fall of 2000. The research vehicles will be boosted to the prescribed scramjet engine test point where they will separate from the booster, stabilize. and initiate engine test. Following 5+ seconds of powered flight and 15 seconds of cowl-open tares, the cowl will close and the vehicle will fly a controlled deceleration trajectory which includes numerous control doublets for in-flight aerodynamic parameter identification. This paper reviews the preflight testing activities, wind tunnel models, test rationale. risk reduction activities, and sample results from wind tunnel tests supporting the flight trajectory of the HXRV from hypersonic engine test point through subsonic flight termination.
Hyper-X Research Vehicle (HXRV) Experimental Aerodynamics Test Program Overview
NASA Technical Reports Server (NTRS)
Holland, Scott D.; Woods, William C.; Engelund, Walter C.
2000-01-01
This paper provides an overview of the experimental aerodynamics test program to ensure mission success for the autonomous flight of the Hyper-X Research Vehicle (HXRV). The HXRV is a 12-ft long, 2700 lb lifting body technology demonstrator designed to flight demonstrate for the first time a fully airframe integrated scramjet propulsion system. Three flights are currently planned, two at Mach 7 and one at Mach 10, beginning in the fall of 2000. The research vehicles will be boosted to the prescribed scramjet engine test point where they will separate from the booster, stabilize, and initiate engine test. Following 5+ seconds of powered flight and 15 seconds of cow-open tares, the cowl will close and the vehicle will fly a controlled deceleration trajectory which includes numerous control doublets for in-flight aerodynamic parameter identification. This paper reviews the preflight testing activities, wind tunnel models, test rationale, risk reduction activities, and sample results from wind tunnel tests supporting the flight trajectory of the HXRV from hypersonic engine test point through subsonic flight termination.
Test plan for formulation and evaluation of grouted waste forms with shine process wastes
DOE Office of Scientific and Technical Information (OSTI.GOV)
Ebert, W. L.; Jerden, J. L.
2015-09-01
The objective of this experimental project is to demonstrate that waste streams generated during the production of Mo99 by the SHINE Medical Technologies (SHINE) process can be immobilized in cement-based grouted waste forms having physical, chemical, and radiological stabilities that meet regulatory requirements for handling, storage, transport, and disposal.
ERIC Educational Resources Information Center
Heller, Barbara R.; Florio, Carol
The Money Management for Women program was designed and implemented to provide lower-income women with financial planning information geared to their current level of understanding and financial circumstances. Objectives were to develop a model consumer education program and test the efficacy of community-based organizations as agents in…
Strategic Planning, Recasts, Noticing, and L2 Development
ERIC Educational Resources Information Center
Hama, Mika
2012-01-01
Since the mid-1990s, the link between recasts and L2 development has been extensively tested, and the results from those studies have largely demonstrated that recasts have a positive effect on L2 learning. With this firm support from previous empirical evidence, studies have begun to focus on how recasts assist learning and under what conditions…
Federal Register 2010, 2011, 2012, 2013, 2014
2010-06-09
... three-year study released in 2008, revealed that 1-to-1 laptop use was associated with higher test..., such as a laptop, is taken off school grounds, however, applicants are required to cost-allocate the... not. 30. Recent data demonstrates that the widespread availability of wireless laptop computing for...
EMPTAC (Electromagnetic Pulse Test Aircraft) User’s Guide.
1988-04-01
8217Jhe 5 JJ 5 1.2 OBJECTIVES - Elf , The objectives of this document are to: 0 Point out major areas of interest which a user must consider while planning...to bridge the gap between the research and development (R&D) and the operational communities . It provides a vehicle to demonstrate and correlate the...digital communication from the ALT. The test responses are processed through the signal conditioners of the ALT and routed to the ALR. From the ALR
Deep Reconditioning Testing for near Earth Orbits
NASA Technical Reports Server (NTRS)
Betz, F. E.; Barnes, W. L.
1984-01-01
The problems and benefits of deep reconditioning to near Earth orbit missions with high cycle life and shallow discharge depth requirements is discussed. A simple battery level approach to deep reconditioning of nickel cadmium batteries in near Earth orbit is considered. A test plan was developed to perform deep reconditioning in direct comparison with an alternative trickle charge approach. The results demonstrate that the deep reconditioning procedure described for near Earth orbit application is inferior to the alternative of trickle charging.
SU-E-T-218: The IHE-RO Helper Tool: Demonstrating the Connectivity Issues Solved by IHE-RO.
Kapoor, Rishabh; Yeung, Daniel; Kumar, Sabari Ajay; Alex, Daley; Kapur, Priyanka; Palta, Jatinder
2012-06-01
To develop a Web-based application (IHE-RO Helper) to allow comprehensive review of the interconnectivity and interoperability of various radiotherapy devices established through testing sanctioned by the Integrating Healthcare Enterprise-Radiation Oncology (IHE-RO). IHE-RO is an initiative sponsored by ASTRO to improve the way computer based systems in radiation oncology share information using well-defined data exchange standards (DICOM / HL7). At the IHE-RO Connectathon events over the last 4 years, 11 vendors with 14 different products have successfully tested and identified solutions to connectivity problems in treatment planning, simulation and delivery. Because the test results are highly technical, the interconnectivity issues amongst the RT devices may get overlooked by the end users. The IHE-RO helper tool is designed to operate in simple clinical terms with queries and presentations organized based on treatment techniques and clinical features that are familiar to the practitioners. For example, if you are planning to purchase a treatment planning system capable of generating plans (e.g. Stereotactic treatments) and are concerned whether the TPS can successfully transfer such data to your treatment management system (TMS) and subsequently to your treatment delivery system (TDS), the IHE-RO Helper can identify the connectivity requirements and list vendors that have successfully passed an IHE-RO Connectathon and validated their solution to the specific requirements. The IHE-RO helper tool provides a graphical and textual user interface to effectively demonstrate the solved interconnectivity problems between TPS, TMS and TDS. A report is also provided that explains the interconnectivity problems and its solutions. The IHE-RO helper is an effective tool to clearly identify vendor products that are IHE-RO compliant, thereby encourages vendor participation in testing and validation. Such a tool will be invaluable in procurement of new equipment to ensure a priori interoperability with anticipated RT devices deployed in the clinic. This research and development project is supported by the Bankhead-Coley Cancer Research Program grant # RC1-09BW-09-26833. © 2012 American Association of Physicists in Medicine.
ER-2 High Altitude Solar Cell Calibration Flights
NASA Technical Reports Server (NTRS)
Myers, Matthew G.; Piszczor, Michael F.
2015-01-01
The first flights of the ER-2 solar cell calibration demonstration were conducted during September-October of 2014. Three flights were performed that not only tested out the equipment and operational procedures, but also demonstrated the capability of this unique facility by conducting the first short-circuit measurements on a variety of test solar cells. Very preliminary results of these first flights were presented at the 2014 Space Photovoltaic Research and Technology (SPRAT) Conference in Cleveland, OH shortly following these first flights. At the 2015 Space Power Workshop, a more detailed description of these first ER-2 flights will be presented, along with the final flight data from some of the test cells that were flown and has now been reduced and corrected for ER-2 atmospheric flight conditions. Plans for ER-2 flights during the summer of 2015 will also be discussed.
Progress of Crew Autonomous Scheduling Test (CAST) On the ISS
NASA Technical Reports Server (NTRS)
Healy, Matthew; Marquez, Jessica; Hillenius, Steven; Korth, David; Bakalyar, Lauren Rush; Woodbury, Neil; Larsen, Crystal M.; Bates, Shelby; Kockler, Mikayla; Rhodes, Brooke;
2017-01-01
The United States space policy is evolving toward missions beyond low Earth orbit. In an effort to meet that policy, NASA has recognized Autonomous Mission Operations (AMO) as a valuable capability. Identified within AMO capabilities is the potential for autonomous planning and replanning during human spaceflight operations. That is allowing crew members to collectively or individually participate in the development of their own schedules. Currently, dedicated mission operations planners collaborate with international partners to create daily plans for astronauts aboard the International Space Station (ISS), taking into account mission requirements, ground rules, and various vehicle and payload constraints. In future deep space operations the crew will require more independence from ground support due to communication transmission delays. Furthermore, crew members who are provided with the capability to schedule their own activities are able to leverage direct experience operating in the space environment, and possibly maximize their efficiency. CAST (Crew Autonomous Scheduling Test) is an ISS investigation designed to analyze three important hypotheses about crew autonomous scheduling. First, given appropriate inputs, the crew is able to create and execute a plan in a reasonable period of time without impacts to mission success. Second, the proximity of the planner, in this case the crew, to the planned operations increases their operational efficiency. Third, crew members are more satisfied when given a role in plan development. This presentation shows the progress done in this study with a single astronaut test subject participating in five CAST sessions. CAST is a technology demonstration payload sponsored by the ISS Research Science and Technology Office, and performed by experts in Mission Operations Planning from the Flight Operations Directorate at NASA Johnson Space Center, and researchers across multiple NASA centers.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Seimenis, Ioannis; Tsekos, Nikolaos V.; Keroglou, Christoforos
2012-04-15
Purpose: The aim of this work was to develop and test a general methodology for the planning and performance of robot-assisted, MR-guided interventions. This methodology also includes the employment of software tools with appropriately tailored routines to effectively exploit the capabilities of MRI and address the relevant spatial limitations. Methods: The described methodology consists of: (1) patient-customized feasibility study that focuses on the geometric limitations imposed by the gantry, the robotic hardware, and interventional tools, as well as the patient; (2) stereotactic preoperative planning for initial positioning of the manipulator and alignment of its end-effector with a selected target; andmore » (3) real-time, intraoperative tool tracking and monitoring of the actual intervention execution. Testing was performed inside a standard 1.5T MRI scanner in which the MR-compatible manipulator is deployed to provide the required access. Results: A volunteer imaging study demonstrates the application of the feasibility stage. A phantom study on needle targeting is also presented, demonstrating the applicability and effectiveness of the proposed preoperative and intraoperative stages of the methodology. For this purpose, a manually actuated, MR-compatible robotic manipulation system was used to accurately acquire a prescribed target through alternative approaching paths. Conclusions: The methodology presented and experimentally examined allows the effective performance of MR-guided interventions. It is suitable for, but not restricted to, needle-targeting applications assisted by a robotic manipulation system, which can be deployed inside a cylindrical scanner to provide the required access to the patient facilitating real-time guidance and monitoring.« less
1993-02-01
the (re)planning framework, incorporating the demonstrators CALIGULA and ALLOCATOR for resource allocation and scheduling respectively. In the Command...demonstrator CALIGULA for the problem of allocating frequencies to a radio link network. The problems in the domain of scheduling are dealt with. which has...demonstrating the (re)planning framework, incorporating the demonstrators CALIGULA and ALLOCATOR for resource allocation and scheduling respectively
Côté, L.; Clavet, D.; St-Hilaire, S.; Vaillancourt, C.; Blondeau, F.; Martineau, B.
1999-01-01
PROBLEM ADDRESSED: In addition to clinical instruction, residents need "people" skills that will enable them to deal with all sorts of patients in difficult clinical situations. We planned a series of 12 seminars to teach these skills to first-year residents. OBJECTIVES OF PROGRAM: To ask relevant questions typical of the patient-centred approach; with empathy and respect, to encourage patients to express their emotions; to become more aware of one's own emotions and reactions in one's work as a physician; to negotiate with patients, taking into account both the patient's agenda and one's own. MAIN COMPONENTS OF PROGRAM: Clinical problems drawn from a list of situations likely to involve difficult contact with patients were used to achieve program objectives. Various teaching methods (discussion, brief presentation, practical demonstration, role play) were used during the four stages of skills development: information, demonstration, practice, and feedback. Various tools were used to test the program. CONCLUSION: Proper planning requires ongoing exploration of objectives, content, teaching methods, and evaluation. This discussion of the teaching principles applied in planning our seminars might inspire others to develop similar programs. PMID:10349069
Feasibility study of an intensity-modulated radiation model for the study of erectile dysfunction.
Koontz, Bridget F; Yan, Hui; Kimura, Masaki; Vujaskovic, Zeljko; Donatucci, Craig; Yin, Fang-Fang
2011-02-01
Preclinical studies of radiotherapy (RT) induced erectile dysfunction (ED) have been limited by radiation toxicity when using large fields. To develop a protocol of rat prostate irradiation using techniques mimicking the current clinical standard of intensity modulated radiotherapy (IMRT). Quality assurance (QA) testing of plan accuracy, animal health 9 weeks after RT, and intracavernosal pressure (ICP) measurement on cavernosal nerve stimulation. Computed tomography-based planning was used to develop a stereotactic radiosurgery (SRS) treatment plan for five young adult male Sprague-Dawley rats. Two treatment planning strategies were utilized to deliver 20 Gy in a single fraction: three-dimensional dynamic conformal arc and intensity-modulated arc (RapidArc). QA testing was performed for each plan type. Treatment was delivered using a NovalisTX (Varian Medical Systems) with high-definition multi-leaf collimators using on-board imaging prior to treatment. Each animal was evaluated for ED 2 months after treatment by nerve stimulation and ICP measurement. The mean prostate volume and target volume (5 mm expansion of prostate) for the five animals was 0.36 and 0.66 cm3, respectively. Both conformal and RapidArc plans provided at least 95% coverage of the target volume, with rapid dose fall-off. QA plans demonstrated strong agreement between doses of calculated and delivered plans, although the conformal arc plan was more homogenous in treatment delivery. Treatment was well tolerated by the animals with no toxicity out to 9 weeks. Compared with control animals, significant reduction in ICP/mean arterial pressure, maximum ICP, and ICP area under the curve were noted. Tightly conformal dynamic arc prostate irradiation is feasible and results in minimal toxicity and measurable changes in erectile function. © 2010 International Society for Sexual Medicine.
Utilization of the International Space Station for Crew Autonomous Scheduling Test (CAST)
NASA Technical Reports Server (NTRS)
Healy, Matthew; Marquez, Jesica; Hillenius, Steven; Korth, David; Bakalyar, Laure Rush; Woodbury, Neil; Larsen, Crystal M.; Bates, Shelby; Kockler, Mikayla; Rhodes, Brooke;
2017-01-01
The United States space policy is evolving toward missions beyond low Earth orbit. In an effort to meet that policy, NASA has recognized Autonomous Mission Operations (AMO) as a valuable capability. Identified within AMO capabilities is the potential for autonomous planning and replanning during human spaceflight operations. That is allowing crew members to collectively or individually participate in the development of their own schedules. Currently, dedicated mission operations planners collaborate with international partners to create daily plans for astronauts aboard the International Space Station (ISS), taking into account mission requirements, ground rules, and various vehicle and payload constraints. In future deep space operations the crew will require more independence from ground support due to communication transmission delays. Furthermore, crew members who are provided with the capability to schedule their own activities are able to leverage direct experience operating in the space environment, and possibly maximize their efficiency. CAST (Crew Autonomous Scheduling Test) is an ISS investigation designed to analyze three important hypotheses about crew autonomous scheduling. First, given appropriate inputs, the crew is able to create and execute a plan in a reasonable period of time without impacts to mission success. Second, the proximity of the planner, in this case the crew, to the planned operations increases their operational efficiency. Third, crew members are more satisfied when given a role in plan development. This paper presents the results from a single astronaut test subject who participated in five CAST sessions. The details on the operational philosophy of CAST are discussed, including the approach to crew training, selection criteria for test days, and data collection methods. CAST is a technology demonstration payload sponsored by the ISS Research Science and Technology Office, and performed by experts in Mission Operations Planning from the Flight Operations Directorate at NASA Johnson Space Center, and researchers across multiple NASA centers. It is hoped the results of this investigation will guide NASA's implementation of autonomous mission operations for long duration human space missions to Mars and beyond.
VIPER: Virtual Intelligent Planetary Exploration Rover
NASA Technical Reports Server (NTRS)
Edwards, Laurence; Flueckiger, Lorenzo; Nguyen, Laurent; Washington, Richard
2001-01-01
Simulation and visualization of rover behavior are critical capabilities for scientists and rover operators to construct, test, and validate plans for commanding a remote rover. The VIPER system links these capabilities. using a high-fidelity virtual-reality (VR) environment. a kinematically accurate simulator, and a flexible plan executive to allow users to simulate and visualize possible execution outcomes of a plan under development. This work is part of a larger vision of a science-centered rover control environment, where a scientist may inspect and explore the environment via VR tools, specify science goals, and visualize the expected and actual behavior of the remote rover. The VIPER system is constructed from three generic systems, linked together via a minimal amount of customization into the integrated system. The complete system points out the power of combining plan execution, simulation, and visualization for envisioning rover behavior; it also demonstrates the utility of developing generic technologies. which can be combined in novel and useful ways.
NASA Technical Reports Server (NTRS)
Wolfe, R. R.
1975-01-01
Space servicing automated payloads was studied for potential cost benefits for future payload operations. Background information is provided on space servicing in general, and on a pilot flight test program in particular. An fight test is recommended to demonstrate space servicing. An overall program plan is provided which builds upon the pilot program through an interim servicing capability. A multipayload servicing concept for the time when the full capability tug becomes operational is presented. The space test program is specifically designed to provide low-cost booster vehicles and a flight test platform for several experiments on a single flight.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Le, A; Choe, K; Jiang, S
2015-06-15
Purpose: To demonstrate the feasibility of a CBCT-based on-site simulation, planning, and delivery (OSPD) for whole brain radiotherapy, in which all steps from imaging, planning to treatment delivery are performed at the treatment unit in one appointment time slot. This work serves as the proof of concept for future OSPD single fraction radiation therapy. Methods: An integrated on-site imaging, planning and delivery workflow was developed and tested for whole brain radiotherapy. An automated two-opposed-oblique-beam plan is created by utilizing the treatment planning system scripting and simple field-in-field IMRT. The IMRT plan is designed with maximum 8 control points to covermore » the target volume consisting of the brain to C1/C2 of the spinal cord, with dose homogeneity criteria from −5% to +7% of the prescription dose. Due to inaccuracy of reconstructed Hounsfield unit numbers in CBCT images, the dose distribution is calculated with non-heterogeneity correction introducing only clinically insignificant dose discrepancy. A coherent and synchronized workflow was designed for a team of attending physician, physicist, therapists, and dosimetrist to work closely with the ability to quickly modify, approve, and implement the treatment. Results: Thirty-one patients have been treated with this OSPD treatment, without compromising the plan quality compared to our regular clinically used parallel apposed 2D plans. The average time for these procedures are 48.02 ±11.55 minutes from the time patient entered the treatment room until s/he exited, and 35.09 ±10.35 minutes from starting CBCT until last beam delivered. This time duration is comparable to the net time when individual tasks are summed up during our regular CT- based whole brain planning and delivery. Conclusions: The OSPD whole brain treatment has been tested to be clinically feasible. The next step is to further improve the efficiency and to streamline the workflow. Other disease sites will be also tested with this new technology.« less
HDU Deep Space Habitat (DSH) Overview
NASA Technical Reports Server (NTRS)
Kennedy, Kriss J.
2011-01-01
This paper gives an overview of the National Aeronautics and Space Administration (NASA) led multi-center Habitat Demonstration Unit (HDU) project Deep Space Habitat (DSH) analog that will be field-tested during the 2011 Desert Research and Technologies Studies (D-RATS) field tests. The HDU project is a technology pull project that integrates technologies and innovations from multiple NASA centers. This project will repurpose the HDU Pressurized Excursion Module (PEM) that was field tested in the 2010 D-RATS, adding habitation functionality to the prototype unit. The 2010 configuration of the HDU-PEM consisted of a lunar surface laboratory module that was used to bring over 20 habitation-related technologies together in a single platform that could be tested as an advanced habitation analog in the context of mission architectures and surface operations. The 2011 HDU-DSH configuration will build upon the PEM work, and emphasize validity of crew operations (habitation and living, etc), EVA operations, mission operations, logistics operations, and science operations that might be required in a deep space context for Near Earth Object (NEO) exploration mission architectures. The HDU project consists of a multi-center team brought together in a skunkworks approach to quickly build and validate hardware in analog environments. The HDU project is part of the strategic plan from the Exploration Systems Mission Directorate (ESMD) Directorate Integration Office (DIO) and the Exploration Mission Systems Office (EMSO) to test destination elements in analog environments. The 2011 analog field test will include Multi Mission Space Exploration Vehicles (MMSEV) and the DSH among other demonstration elements to be brought together in a mission architecture context. This paper will describe overall objectives, various habitat configurations, strategic plan, and technology integration as it pertains to the 2011 field tests.
Shuttle payload vibroacoustic test plan evaluation
NASA Technical Reports Server (NTRS)
Stahle, C. V.; Gongloff, H. R.; Young, J. P.; Keegan, W. B.
1977-01-01
Statistical decision theory is used to evaluate seven alternate vibro-acoustic test plans for Space Shuttle payloads; test plans include component, subassembly and payload testing and combinations of component and assembly testing. The optimum test levels and the expected cost are determined for each test plan. By including all of the direct cost associated with each test plan and the probabilistic costs due to ground test and flight failures, the test plans which minimize project cost are determined. The lowest cost approach eliminates component testing and maintains flight vibration reliability by performing subassembly tests at a relatively high acoustic level.
Integrated Ground Operations Demonstration Units Testing Plans and Status
NASA Technical Reports Server (NTRS)
Johnson, Robert G.; Notardonato, William U.; Currin, Kelly M.; Orozco-Smith, Evelyn M.
2012-01-01
Cryogenic propellant loading operations with their associated flight and ground systems are some of the most complex, critical activities in launch operations. Consequently, these systems and operations account for a sizeable portion of the life cycle costs of any launch program. NASA operations for handling cryogens in ground support equipment have not changed substantially in 50 years, despite advances in cryogenics, system health management and command and control technologies. This project was developed to mature, integrate and demonstrate advancement in the current state of the art in these areas using two distinct integrated ground operations demonstration units (GODU): GODU Integrated Refrigeration and Storage (IRAS) and GODU Autonomous Control
The Italian Optical Telecommunications Payload: Breadboard Results
NASA Astrophysics Data System (ADS)
Bonino, L.; Caramia, M.; Catalano, V.; Ferrero, V.; Mata Calvo, R.
2008-08-01
The interest in satellite optical communication link has grown in the last years driven by the increasing demand in data downlink for scientific, planetary exploration and earth observation missions; in addition particular interest is also demonstrated by military market. In this context, the Italian Space Agency (ASI) is developing a program for feasibility demonstration of optical communication system with the goal of a prototype flight mission in the next future. The Paper intends to present the overall program plan and it is particularly focused on the activities performed during the Phase A2, relevant to stratospheric mission design and test campaign with an open field demonstrator of free space communications.
WET-NZ Multi-Mode Wave Energy Converter Advancement Project
DOE Office of Scientific and Technical Information (OSTI.GOV)
Kopf, Steven
2013-10-15
The overall objective of the project was to verify the ocean wavelength functionality of the WET-NZ through targeted hydrodynamic testing at wave tank scale and controlled open sea deployment of a 1/2 scale (1:2) experimental device. This objective was accomplished through a series of tasks designed to achieve four specific goals: Wave Tank Testing to Characterize Hydrodynamic Characteristics; Open-Sea Testing of a New 1:2 Scale Experimental Model; Synthesis and Analysis to Demonstrate and Confirm TRL5/6 Status; Market Impact & Competitor Analysis, Business Plan and Commercialization Strategy.
LANDSAT demonstration/application and GIS integration in south central Alaska
NASA Technical Reports Server (NTRS)
Burns, A. W.; Derrenbacher, W.
1981-01-01
Automated geographic information systems were developed for two sites in Southcentral Alaska to serve as tests for both the process of integrating classified LANDSAT data into a comprehensive environmental data base and the process of using automated information in land capability/suitability analysis and environmental planning. The Big Lake test site, located approximately 20 miles north of the City of Anchorage, comprises an area of approximately 150 square miles. The Anchorage Hillside test site, lying approximately 5 miles southeast of the central part of the city, extends over an area of some 25 square miles. Map construction and content is described.
Spacelab mission development tests
NASA Technical Reports Server (NTRS)
Dalton, B. P.
1978-01-01
The paper describes Spacelab Mission Development Test III (SMD III) whose principal scientific objective was to demonstrate the feasibility of conducting biological research in the Life Sciences Spacelab. The test also provided an opportunity to try out several items of Common Operational Research Equipment (CORE) hardware being developed for operational use in Shuttle/Spacelab, such as rodent and primate handling, transportation units, and a 'zero-g' surgical bench. Operational concepts planned for Spacelab were subjected to evaluation, including animal handling procedures, animal logistics, crew selection and training, and a 'remote' ground station concept. It is noted that all the objectives originally proposed for SMD III were accomplished
A Plan for the Development and Demonstration of Optical Communications for Deep Space
NASA Technical Reports Server (NTRS)
Lesh, J. R.; Deutsch, L. J.; Weber, W. J.
1990-01-01
In this article, an overall plan for the development and demonstration of optical communications for deep-space applications is presented. The current state of the technology for optical communications is presented. Then, the development and demonstration plan is presented in two parts: the overall major systems activities, followed by the generic technology developments that will enable them. The plan covers the path from laboratory subsystems demonstrations out to a full-scale flight experiment system for the proposed Mars Communications Relay Orbiter mission.
NASA Astrophysics Data System (ADS)
McIntosh, Chris; Welch, Mattea; McNiven, Andrea; Jaffray, David A.; Purdie, Thomas G.
2017-08-01
Recent works in automated radiotherapy treatment planning have used machine learning based on historical treatment plans to infer the spatial dose distribution for a novel patient directly from the planning image. We present a probabilistic, atlas-based approach which predicts the dose for novel patients using a set of automatically selected most similar patients (atlases). The output is a spatial dose objective, which specifies the desired dose-per-voxel, and therefore replaces the need to specify and tune dose-volume objectives. Voxel-based dose mimicking optimization then converts the predicted dose distribution to a complete treatment plan with dose calculation using a collapsed cone convolution dose engine. In this study, we investigated automated planning for right-sided oropharaynx head and neck patients treated with IMRT and VMAT. We compare four versions of our dose prediction pipeline using a database of 54 training and 12 independent testing patients by evaluating 14 clinical dose evaluation criteria. Our preliminary results are promising and demonstrate that automated methods can generate comparable dose distributions to clinical. Overall, automated plans achieved an average of 0.6% higher dose for target coverage evaluation criteria, and 2.4% lower dose at the organs at risk criteria levels evaluated compared with clinical. There was no statistically significant difference detected in high-dose conformity between automated and clinical plans as measured by the conformation number. Automated plans achieved nine more unique criteria than clinical across the 12 patients tested and automated plans scored a significantly higher dose at the evaluation limit for two high-risk target coverage criteria and a significantly lower dose in one critical organ maximum dose. The novel dose prediction method with dose mimicking can generate complete treatment plans in 12-13 min without user interaction. It is a promising approach for fully automated treatment planning and can be readily applied to different treatment sites and modalities.
McIntosh, Chris; Welch, Mattea; McNiven, Andrea; Jaffray, David A; Purdie, Thomas G
2017-07-06
Recent works in automated radiotherapy treatment planning have used machine learning based on historical treatment plans to infer the spatial dose distribution for a novel patient directly from the planning image. We present a probabilistic, atlas-based approach which predicts the dose for novel patients using a set of automatically selected most similar patients (atlases). The output is a spatial dose objective, which specifies the desired dose-per-voxel, and therefore replaces the need to specify and tune dose-volume objectives. Voxel-based dose mimicking optimization then converts the predicted dose distribution to a complete treatment plan with dose calculation using a collapsed cone convolution dose engine. In this study, we investigated automated planning for right-sided oropharaynx head and neck patients treated with IMRT and VMAT. We compare four versions of our dose prediction pipeline using a database of 54 training and 12 independent testing patients by evaluating 14 clinical dose evaluation criteria. Our preliminary results are promising and demonstrate that automated methods can generate comparable dose distributions to clinical. Overall, automated plans achieved an average of 0.6% higher dose for target coverage evaluation criteria, and 2.4% lower dose at the organs at risk criteria levels evaluated compared with clinical. There was no statistically significant difference detected in high-dose conformity between automated and clinical plans as measured by the conformation number. Automated plans achieved nine more unique criteria than clinical across the 12 patients tested and automated plans scored a significantly higher dose at the evaluation limit for two high-risk target coverage criteria and a significantly lower dose in one critical organ maximum dose. The novel dose prediction method with dose mimicking can generate complete treatment plans in 12-13 min without user interaction. It is a promising approach for fully automated treatment planning and can be readily applied to different treatment sites and modalities.
NASA Technical Reports Server (NTRS)
Bragg-Sitton, S. M.; Webster, K. L.
2007-01-01
Nonnuclear testing can be a valuable tool in the development of an in-space nuclear power or propulsion system. In a nonnuclear test facility, electric heaters are used to simulate heat from nuclear fuel. Standard testing allows one to fully assess thermal, heat transfer, and stress related attributes of a given system but fails to demonstrate the dynamic response that would be present in an integrated, fueled reactor system. The integration of thermal hydraulic hardware tests with simulated neutronic response provides a bridge between electrically heated testing and full nuclear testing. By implementing a neutronic response model to simulate the dynamic response that would be expected in a fueled reactor system, one can better understand system integration issues, characterize integrated system response times and response and response characteristics, and assess potential design improvements with a relatively small fiscal investment. Initial system dynamic response testing was demonstrated on the integrated SAFE 100a heat pipe cooled, electrically heated reactor and heat exchanger hardware. This Technical Memorandum discusses the status of the planned dynamic test methodology for implementation in the direct-drive gas-cooled reactor testing and assesses the additional instrumentation needed to implement high-fidelity dynamic testing.
Market assessment of PFBC ash use
DOE Office of Scientific and Technical Information (OSTI.GOV)
Bland, A. E.; Brown, T. H., Western Research Institute
1998-01-01
Pressurized fluidized bed combustion (PFBC) of coal is undergoing demonstration in the United States, as well as throughout the world. American Electric Power`s (AEP`s) bubbling PFBC 70 MWe Tidd demonstration program in Ohio and pilot-scale development at Foster Wheeler Energia Oy 10 MWth circulating PFBC at Karhula, Finland, have demonstrated the advantages of PFBC technology. Further technology development in the US is planned with the deployment of the technology at the MacIntosh Clean Coal project in Lakeland, Florida. Development of uses for solid wastes from PFBC coal-fired power systems is being actively pursued as part of the demonstration of PFBCmore » technologies. Ashes collected from Foster Wheeler Energia Oy pilot circulating PFBC tests in Karhula, Finland, operating on (1) low sulfur subbituminous and (2) high sulfur bituminous coal; and ash from the AEP`s high-sulfur bituminous coal-fired bubbling PFBC in Brilliant, Ohio, were evaluated in laboratory and pilot-scale ash use testing at Western Research Institute (WRI).« less
Risk and resilience in an uncertain world
Dale, Virginia H.; Jager, Henriette I.; Wolfe, Amy K.; ...
2018-02-01
We report that because the future is uncertain and to some extent unknowable, it is imperative that ecologists become involved in the discussion and planning of future infrastructure and protection from the effects of altered disturbance regimes. Research can test and demonstrate the benefits of protecting or proactively managing important features and places, and processes that enhance provisioning of ecosystem services such as flood control and fire mitigation. In conclusion, it is time to demonstrate how ecological science, when applied to human–environmental systems, can reduce risks and enhance resilience in a complex, changing world.
Risk and resilience in an uncertain world
DOE Office of Scientific and Technical Information (OSTI.GOV)
Dale, Virginia H.; Jager, Henriette I.; Wolfe, Amy K.
We report that because the future is uncertain and to some extent unknowable, it is imperative that ecologists become involved in the discussion and planning of future infrastructure and protection from the effects of altered disturbance regimes. Research can test and demonstrate the benefits of protecting or proactively managing important features and places, and processes that enhance provisioning of ecosystem services such as flood control and fire mitigation. In conclusion, it is time to demonstrate how ecological science, when applied to human–environmental systems, can reduce risks and enhance resilience in a complex, changing world.
Test plan: the Czechowice Oil Refinery bioremediation demonstration of a process waste lagoon
DOE Office of Scientific and Technical Information (OSTI.GOV)
Altman, D.J.; Lombard, K.H.; Hazen, T.C.
1997-03-31
The remediation strategies that will be applied at the Czechowice Oil Refinery waste lagoon in Czechowice, Poland are designed, managed, and implemented under the direction of the Westinghouse Savannah River Company (WSRC) for the United States Department of Energy (DOE). WSRC will be assisted in the demonstration by The Institute for Ecology of Industrial Areas (IETU). This collaboration between IETU and DOE will provide the basis for international technology transfer of new and innovative remediation technologies that can be applied in Poland and the Eastern European Region as well.
Löck, Steffen; Roth, Klaus; Skripcak, Tomas; Worbs, Mario; Helmbrecht, Stephan; Jakobi, Annika; Just, Uwe; Krause, Mechthild; Baumann, Michael; Enghardt, Wolfgang; Lühr, Armin
2015-09-01
To guarantee equal access to optimal radiotherapy, a concept of patient assignment to photon or particle radiotherapy using remote treatment plan exchange and comparison - ReCompare - was proposed. We demonstrate the implementation of this concept and present its clinical applicability. The ReCompare concept was implemented using a client-server based software solution. A clinical workflow for the remote treatment plan exchange and comparison was defined. The steps required by the user and performed by the software for a complete plan transfer were described and an additional module for dose-response modeling was added. The ReCompare software was successfully tested in cooperation with three external partner clinics and worked meeting all required specifications. It was compatible with several standard treatment planning systems, ensured patient data protection, and integrated in the clinical workflow. The ReCompare software can be applied to support non-particle radiotherapy institutions with the patient-specific treatment decision on the optimal irradiation modality by remote treatment plan exchange and comparison. Copyright © 2015. Published by Elsevier GmbH.
Phase 2 Methyl Iodide Deep-Bed Adsorption Tests
DOE Office of Scientific and Technical Information (OSTI.GOV)
Soelberg, Nick; Watson, Tony
2014-09-01
Nuclear fission produces fission products (FPs) and activation products, including iodine-129, which could evolve into used fuel reprocessing facility off-gas systems, and could require off-gas control to limit air emissions to levels within acceptable emission limits. Research, demonstrations, and some reprocessing plant experience have indicated that diatomic iodine can be captured with efficiencies high enough to meet regulatory requirements. Research on the capture of organic iodides has also been performed, but to a lesser extent. Several questions remain open regarding the capture of iodine bound in organic compounds. Deep-bed methyl iodide adsorption testing has progressed according to a multi-laboratory methylmore » iodide adsorption test plan. This report summarizes the second phase of methyl iodide adsorption work performed according to this test plan using the deep-bed iodine adsorption test system at the Idaho National Laboratory (INL), performed during the second half of Fiscal Year (FY) 2014. Test results continue to show that methyl iodide adsorption using AgZ can achieve total iodine decontamination factors (DFs, ratios of uncontrolled and controlled total iodine levels) above 1,000, until breakthrough occurred. However, mass transfer zone depths are deeper for methyl iodide adsorption compared to diatomic iodine (I2) adsorption. Methyl iodide DFs for the Ag Aerogel test adsorption efficiencies were less than 1,000, and the methyl iodide mass transfer zone depth exceeded 8 inches. Additional deep-bed testing and analyses are recommended to (a) expand the data base for methyl iodide adsorption under various conditions specified in the methyl iodide test plan, and (b) provide more data for evaluating organic iodide reactions and reaction byproducts for different potential adsorption conditions.« less
Zakjevskii, Viatcheslav V.; Knill, Cory S.; Rakowski, Joseph. T.
2016-01-01
A comprehensive end‐to‐end test for head and neck IMRT treatments was developed using a custom phantom designed to utilize multiple dosimetry devices. Initial end‐to‐end test and custom H&N phantom were designed to yield maximum information in anatomical regions significant to H&N plans with respect to: (i) geometric accuracy, (ii) dosimetric accuracy, and (iii) treatment reproducibility. The phantom was designed in collaboration with Integrated Medical Technologies. The phantom was imaged on a CT simulator and the CT was reconstructed with 1 mm slice thickness and imported into Varian's Eclipse treatment planning system. OARs and the PTV were contoured with the aid of Smart Segmentation. A clinical template was used to create an eight‐field IMRT plan and dose was calculated with heterogeneity correction on. Plans were delivered with a TrueBeam equipped with a high definition MLC. Preliminary end‐to‐end results were measured using film, ion chambers, and optically stimulated luminescent dosimeters (OSLDs). Ion chamber dose measurements were compared to the treatment planning system. Films were analyzed with FilmQA Pro using composite gamma index. OSLDs were read with a MicroStar reader using a custom calibration curve. Final phantom design incorporated two axial and one coronal film planes with 18 OSLD locations adjacent to those planes as well as four locations for IMRT ionization chambers below inferior film plane. The end‐to‐end test was consistently reproducible, resulting in average gamma pass rate greater than 99% using 3%/3 mm analysis criteria, and average OSLD and ion chamber measurements within 1% of planned dose. After initial calibration of OSLD and film systems, the end‐to‐end test provides next‐day results, allowing for integration in routine clinical QA. Preliminary trials have demonstrated that our end‐to‐end is a reproducible QA tool that enables the ongoing evaluation of dosimetric and geometric accuracy of clinical head and neck treatments. PACS number(s): 87.55.Qr PMID:27074453
Nuclear Systems Kilopower Overview
NASA Technical Reports Server (NTRS)
Palac, Don; Gibson, Marc; Mason, Lee; Houts, Michael; McClure, Patrick; Robinson, Ross
2016-01-01
The Nuclear Systems Kilopower Project was initiated by NASAs Space Technology Mission Directorate Game Changing Development Program in fiscal year 2015 to demonstrate subsystem-level technology readiness of small space fission power in a relevant environment (Technology Readiness Level 5) for space science and human exploration power needs. The Nuclear Systems Kilopower Project consists of two elements. The primary element is the Kilopower Prototype Test, also called the Kilopower Reactor Using Stirling Technology(KRUSTY) Test. This element consists of the development and testing of a fission ground technology demonstrator of a 1 kWe fission power system. A 1 kWe system matches requirements for some robotic precursor exploration systems and future potential deep space science missions, and also allows a nuclear ground technology demonstration in existing nuclear test facilities at low cost. The second element, the Mars Kilopower Scalability Study, consists of the analysis and design of a scaled-up version of the 1 kWe reference concept to 10 kWe for Mars surface power projected requirements, and validation of the applicability of the KRUSTY experiment to key technology challenges for a 10 kWe system. If successful, these two elements will lead to initiation of planning for a technology demonstration of a 10 kWe fission power capability for Mars surface outpost power.
2018-03-04
SpaceX performed its fourteenth overall parachute test supporting Crew Dragon development. This most recent exercise was the first of several planned parachute system qualification tests ahead of the spacecraft’s first crewed flight and resulted in the successful touchdown of Crew Dragon’s parachute system. During this test, a C-130 aircraft transported the parachute test vehicle, designed to achieve the maximum speeds that Crew Dragon could experience on re-entry, over the Mojave Desert in Southern California and dropped the vehicle from an altitude of 25,000 feet. The test demonstrated an off-nominal situation, deploying only one of the two drogue chutes and intentionally skipping a reefing stage on one of the four main parachutes, proving a safe landing in such a contingency scenario.
NASA Technical Reports Server (NTRS)
2001-01-01
X-40A Free Flight #5. The unpowered X-40A, an 85 percent scale risk reduction version of the proposed X-37, proved the capability of an autonomous flight control and landing system in a series of glide flights at NASA's Dryden Flight Research Center in California. NASA's Marshall Space Flight Center in Huntsville, Alabama, manages the X-37 project. At Dryden, the X-40A underwent a series of ground and air tests to reduce possible risks to the larger X-37, including drop tests from a helicopter to check guidance and navigation systems planned for use in the X-37. The X-37 is designed to demonstrate technologies in the orbital and reentry environments for next-generation reusable launch vehicles that will increase both safety and reliability, while reducing launch costs from $10,000 per pound to $1,000 per pound. The X-37, carried into orbit by the Space Shuttle, is planned to fly two orbital missions to test reusable launch vehicle technologies.
ERIC Educational Resources Information Center
Love, Matthew
"Design Inspection Reviews" are structured meetings in which participants follow certain rules of procedure and behavior when conducting detailed readings of design plans to identify errors and misunderstandings. The technique is widely used in the software engineering industry, where it is demonstrably more effective than testing at…
Padgett, Kyle R; Stoyanova, Radka; Pirozzi, Sara; Johnson, Perry; Piper, Jon; Dogan, Nesrin; Pollack, Alan
2018-03-01
Validating deformable multimodality image registrations is challenging due to intrinsic differences in signal characteristics and their spatial intensity distributions. Evaluating multimodality registrations using these spatial intensity distributions is also complicated by the fact that these metrics are often employed in the registration optimization process. This work evaluates rigid and deformable image registrations of the prostate in between diagnostic-MRI and radiation treatment planning-CT by utilizing a planning-MRI after fiducial marker placement as a surrogate. The surrogate allows for the direct quantitative analysis that can be difficult in the multimodality domain. For thirteen prostate patients, T2 images were acquired at two different time points, the first several weeks prior to planning (diagnostic-MRI) and the second on the same day as the planning-CT (planning-MRI). The diagnostic-MRI was deformed to the planning-CT utilizing a commercially available algorithm which synthesizes a deformable image registration (DIR) algorithm from local rigid registrations. The planning-MRI provided an independent surrogate for the planning-CT for assessing registration accuracy using image similarity metrics, including Pearson correlation and normalized mutual information (NMI). A local analysis was performed by looking only within the prostate, proximal seminal vesicles, penile bulb, and combined areas. The planning-MRI provided an excellent surrogate for the planning-CT with residual error in fiducial alignment between the two datasets being submillimeter, 0.78 mm. DIR was superior to the rigid registration in 11 of 13 cases demonstrating a 27.37% improvement in NMI (P < 0.009) within a regional area surrounding the prostate and associated critical organs. Pearson correlations showed similar results, demonstrating a 13.02% improvement (P < 0.013). By utilizing the planning-MRI as a surrogate for the planning-CT, an independent evaluation of registration accuracy is possible. This population provides an ideal testing ground for MRI to CT DIR by obviating the need for multimodality comparisons which are inherently more challenging. © 2018 The Authors. Journal of Applied Clinical Medical Physics published by Wiley Periodicals, Inc. on behalf of American Association of Physicists in Medicine.
Development and Demonstration of Sustainable Surface Infrastructure for Moon/Mars Exploration
NASA Technical Reports Server (NTRS)
Sanders, Gerald B.; Larson, William E.; Picard, Martin
2011-01-01
For long-term human exploration of the Moon and Mars to be practical, affordable, and sustainable, future missions must be able to identify and utilize resources at the site of exploration. The ability to characterize, extract, processes, and separate products from local material, known as In-Situ Resource Utilization (ISRU), can provide significant reductions in launch mass, logistics, and development costs while reducing risk through increased mission flexibility and protection as well as increased mission capabilities in the areas of power and transportation. Making mission critical consumables like propellants, fuel cell reagents and life support gases, as well as in-situ crew/hardware protection and energy storage capabilities can significantly enhance robotic and human science and exploration missions, however other mission systems need to be designed to interface with and utilize these in-situ developed products and services from the start or the benefits will be minimized or eliminated. This requires a level of surface and transportation system development coordination not typically utilized during early technology and system development activities. An approach being utilized by the US National Aeronautics and Space Administration and the Canadian Space Agency has been to utilize joint analogue field demonstrations to focus technology development activities to demonstrate and integrate new and potentially game changing. mission critical capabilities that would enable an affordable and sustainable surface infrastructure for lunar and Mars robotic and human exploration. Two analogue field tests performed in November 2008 and February 2010 demonstrated first generation capabilities for lunar resource prospecting, exploration site preparation, and oxygen extraction from regolith while initiating integration with mobility, science, fuel cell power, and propulsion disciplines. A third analogue field test currently planned for June 2012 will continue and expand the fidelity and integration of these surface exploration and infrastructure capabilities while adding Mars exploration technologies, improving remote operations and control of hardware, and promoting the use of common software, interfaces, & standards for control and operation for surface exploration and science. The next field test will also attempt to include greater involvement by industry, academia, and other countries/space agencies. This paper will provide an overview of the development and demonstration approach utilized to date, the results of the previous two ISRU-focused field analogue tests in Hawaii, and the current objectives and plans for the 3rd international Hawaii analogue field test.
NASA Astrophysics Data System (ADS)
Dittes, Beatrice; Kaiser, Maria; Špačková, Olga; Rieger, Wolfgang; Disse, Markus; Straub, Daniel
2018-05-01
Planning authorities are faced with a range of questions when planning flood protection measures: is the existing protection adequate for current and future demands or should it be extended? How will flood patterns change in the future? How should the uncertainty pertaining to this influence the planning decision, e.g., for delaying planning or including a safety margin? Is it sufficient to follow a protection criterion (e.g., to protect from the 100-year flood) or should the planning be conducted in a risk-based way? How important is it for flood protection planning to accurately estimate flood frequency (changes), costs and damage? These are questions that we address for a medium-sized pre-alpine catchment in southern Germany, using a sequential Bayesian decision making framework that quantitatively addresses the full spectrum of uncertainty. We evaluate different flood protection systems considered by local agencies in a test study catchment. Despite large uncertainties in damage, cost and climate, the recommendation is robust for the most conservative approach. This demonstrates the feasibility of making robust decisions under large uncertainty. Furthermore, by comparison to a previous study, it highlights the benefits of risk-based planning over the planning of flood protection to a prescribed return period.
A test of the California competency-based differentiated role model.
Keating, Sarah B; Rutledge, Dana N; Sargent, Arlene; Walker, Polly
2003-01-01
To address the incongruence between the expectations of nursing service and education in California, the Education Industry Interface Task Force of the California Strategic Planning Committee for Nursing developed descriptions to assist employers and educators in clearly differentiating practice and educational competencies. The completion of the Competency-Based Role Differentiation Model resulted in the need to test the model for its utility in the service setting, in education, and for career planning for nurses. Three alpha demonstration sites were selected based on representative geographical regions of California. The sites were composed of tri-partnerships consisting of a medical center, an associate degree in nursing program, and a baccalaureate nursing program. Observers rated senior students and new graduates in medical-surgical units on their behaviors in teacher and leadership care provider and care coordinator roles. The alpha demonstration study results were as expected. That is, senior students practice predominantly at a novice level in teacher and management/leadership care provider functions and new graduates practice predominately at the competent level. New graduates are more likely to take on novice and competent care coordinator roles. The CBRDM may be useful for practice and education settings to evaluate student and nurse performance, to define role expectations, and to identify the preparation necessary for the roles. It is useful for all of nursing as it continues to define its levels of practice and their relationship to on-the-job performance, curriculum development, and carrier planning.
EON: a component-based approach to automation of protocol-directed therapy.
Musen, M A; Tu, S W; Das, A K; Shahar, Y
1996-01-01
Provision of automated support for planning protocol-directed therapy requires a computer program to take as input clinical data stored in an electronic patient-record system and to generate as output recommendations for therapeutic interventions and laboratory testing that are defined by applicable protocols. This paper presents a synthesis of research carried out at Stanford University to model the therapy-planning task and to demonstrate a component-based architecture for building protocol-based decision-support systems. We have constructed general-purpose software components that (1) interpret abstract protocol specifications to construct appropriate patient-specific treatment plans; (2) infer from time-stamped patient data higher-level, interval-based, abstract concepts; (3) perform time-oriented queries on a time-oriented patient database; and (4) allow acquisition and maintenance of protocol knowledge in a manner that facilitates efficient processing both by humans and by computers. We have implemented these components in a computer system known as EON. Each of the components has been developed, evaluated, and reported independently. We have evaluated the integration of the components as a composite architecture by implementing T-HELPER, a computer-based patient-record system that uses EON to offer advice regarding the management of patients who are following clinical trial protocols for AIDS or HIV infection. A test of the reuse of the software components in a different clinical domain demonstrated rapid development of a prototype application to support protocol-based care of patients who have breast cancer. PMID:8930854
NASA Technical Reports Server (NTRS)
Alexander, R. H. (Principal Investigator)
1973-01-01
The author has identified the following significant results. Accomplishments have included: (1) completion of the research design for the USGS/CARETS demonstration project; (2) preparation of photomossics and land use maps at a scale of 1:100,000 for entire area; (3) demonstration of the feasibility of extracting several categories of land use information from ERTS-1 MSS data for a portion of the CARETS region; (4) demonstration of the feasibility of detecting some significant land use changes on ERTS-1 imagery; (5) demonstration of the feasibility of attaching environmental impact significance to the remote sensor-derived land use data; (6) delivery of land use information derived from high altitude aircraft data to the Maryland state planning agency for use in its statewide land use inventory; (7) demonstration of high interest by other use groups in the test region in products and services provided by investigation; and (8) determination of the viability of setting up a computerized geographic information system as part of the CARETS investigation, to facilitate handling of sensor-derived land use data in a variety of formats to suit user requirements.
NASA's Webb "Pathfinder Telescope" Successfully Completes First Super-Cold Optical Test
2017-12-08
Testing is crucial part of NASA's success on Earth and in space. So, as the actual flight components of NASA's James Webb Space Telescope come together, engineers are testing the non-flight equipment to ensure that tests on the real Webb telescope later goes safely and according to plan. Recently, the "pathfinder telescope," or just “Pathfinder,” completed its first super-cold optical test that resulted in many first-of-a-kind demonstrations. "This test is the first dry-run of the equipment and procedures we will use to conduct an end-to-end optical test of the flight telescope and instruments," said Mark Clampin, Webb telescope Observatory Project Scientist at NASA's Goddard Space Flight Center in Greenbelt, Maryland. "It provides confidence that once the flight telescope is ready, we are fully prepared for a successful test of the flight hardware." The Pathfinder is a non-flight replica of the Webb telescope’s center section backplane, or “backbone,” that includes mirrors. The flight backplane comes in three segments, a center section and two wing-like parts, all of which will support large hexagonal mirrors on the Webb telescope. The pathfinder only consists of the center part of the backplane. However, during the test, it held two full size spare primary mirror segments and a full size spare secondary mirror to demonstrate the ability to optically test and align the telescope at the planned operating temperatures of -400 degrees Fahrenheit (-240 Celsius). Read more: www.nasa.gov/feature/goddard/nasas-webb-pathfinder-telesc... Credit: NASA/Goddard/Chris Gunn NASA image use policy. NASA Goddard Space Flight Center enables NASA’s mission through four scientific endeavors: Earth Science, Heliophysics, Solar System Exploration, and Astrophysics. Goddard plays a leading role in NASA’s accomplishments by contributing compelling scientific knowledge to advance the Agency’s mission. Follow us on Twitter Like us on Facebook Find us on Instagram
Coverage-based constraints for IMRT optimization
NASA Astrophysics Data System (ADS)
Mescher, H.; Ulrich, S.; Bangert, M.
2017-09-01
Radiation therapy treatment planning requires an incorporation of uncertainties in order to guarantee an adequate irradiation of the tumor volumes. In current clinical practice, uncertainties are accounted for implicitly with an expansion of the target volume according to generic margin recipes. Alternatively, it is possible to account for uncertainties by explicit minimization of objectives that describe worst-case treatment scenarios, the expectation value of the treatment or the coverage probability of the target volumes during treatment planning. In this note we show that approaches relying on objectives to induce a specific coverage of the clinical target volumes are inevitably sensitive to variation of the relative weighting of the objectives. To address this issue, we introduce coverage-based constraints for intensity-modulated radiation therapy (IMRT) treatment planning. Our implementation follows the concept of coverage-optimized planning that considers explicit error scenarios to calculate and optimize patient-specific probabilities q(\\hat{d}, \\hat{v}) of covering a specific target volume fraction \\hat{v} with a certain dose \\hat{d} . Using a constraint-based reformulation of coverage-based objectives we eliminate the trade-off between coverage and competing objectives during treatment planning. In-depth convergence tests including 324 treatment plan optimizations demonstrate the reliability of coverage-based constraints for varying levels of probability, dose and volume. General clinical applicability of coverage-based constraints is demonstrated for two cases. A sensitivity analysis regarding penalty variations within this planing study based on IMRT treatment planning using (1) coverage-based constraints, (2) coverage-based objectives, (3) probabilistic optimization, (4) robust optimization and (5) conventional margins illustrates the potential benefit of coverage-based constraints that do not require tedious adjustment of target volume objectives.
NASA Technical Reports Server (NTRS)
Bonet, John T.; Schellenger, Harvey G.; Rawdon, Blaine K.; Elmer, Kevin R.; Wakayama, Sean R.; Brown, Derrell L.; Guo, Yueping
2011-01-01
NASA has set demanding goals for technology developments to meet national needs to improve fuel efficiency concurrent with improving the environment to enable air transportation growth. A figure shows NASA's subsonic transport system metrics. The results of Boeing ERA N+2 Advanced Vehicle Concept Study show that the Blended Wing Body (BWB) vehicle, with ultra high bypass propulsion systems have the potential to meet the combined NASA ERA N+2 goals. This study had 3 main activities. 1) The development of an advanced vehicle concepts that can meet the NASA system level metrics. 2) Identification of key enabling technologies and the development of technology roadmaps and maturation plans. 3) The development of a subscale test vehicle that can demonstrate and mature the key enabling technologies needed to meet the NASA system level metrics. Technology maturation plans are presented and include key performance parameters and technical performance measures. The plans describe the risks that will be reduced with technology development and the expected progression of technical maturity.
Venkataramani, PrasannaVenkhatesh; Gopal, Atul; Murthy, Aditya
2018-03-01
Although race models have been extensively used to study inhibitory control, the mechanisms that enable change of reach plans in the context of race models remain unexplored. We used a redirect task in which targets occasionally changed their locations to study the control of reaching movements during movement planning and execution phases. We tested nine different race model architectures that could explain the redirect behavior of reaching movements. We show that an independent GO-STOP-GO model that reflects a plan-abort-re-plan strategy involving non-interacting elements successfully explained the various behavioral measures such as the compensation function and the pattern of error response reaction times. By extending the same race model to the execution phase, we could explain the extent and the pattern of hypometric trials. Interestingly, the race model also provided evidence that redirecting a movement during planning and execution shared the same inhibitory mechanism. Taken together, this study demonstrates the applicability of an independent race model to understand the computational mechanisms underlying the control of reach movements. © 2018 Federation of European Neuroscience Societies and John Wiley & Sons Ltd.
NASA Technology Demonstrations Missions Program Overview
NASA Technical Reports Server (NTRS)
Turner, Susan
2011-01-01
The National Aeronautics and Space Administration (NASA) Fiscal Year 2010 (FY10) budget introduced a new strategic plan that placed renewed emphasis on advanced missions beyond Earth orbit. This supports NASA s 2011 strategic goal to create innovative new space technologies for our exploration, science, and economic future. As a result of this focus on undertaking many and more complex missions, NASA placed its attention on a greater investment in technology development, and this shift resulted in the establishment of the Technology Demonstrations Missions (TDM) Program. The TDM Program, within the newly formed NASA Office of the Chief Technologist, supports NASA s grand challenges by providing a steady cadence of advanced space technology demonstrations (Figure 1), allowing the infusion of flexible path capabilities for future exploration. The TDM Program's goal is to mature crosscutting capabilities to flight readiness in support of multiple future space missions, including flight test projects where demonstration is needed before the capability can transition to direct mission The TDM Program has several unique criteria that set it apart from other NASA program offices. For instance, the TDM Office matures a small number of technologies that are of benefit to multiple customers to flight technology readiness level (TRL) 6 through relevant environment testing on a 3-year development schedule. These technologies must be crosscutting, which is defined as technology with potential to benefit multiple mission directorates, other government agencies, or the aerospace industry, and they must capture significant public interest and awareness. These projects will rely heavily on industry partner collaboration, and funding is capped for all elements of the flight test demonstration including planning, hardware development, software development, launch costs, ground operations, and post-test assessments. In order to inspire collaboration across government and industry, more than 70% of the TDM funds will be competitively awarded as a result of yearly calls for proposed flight demonstrators and selected based on possible payoff to NASA, technology maturity, customer interest, cost, and technical risk reduction. This paper will give an overview of the TDM Program s mission and organization, as well as its current status in delivering advanced space technologies that will enable more flexible and robust future missions. It also will provide several examples of missions that fit within these parameters and expected outcomes.
Active Control of High Frequency Combustion Instability in Aircraft Gas-Turbine Engines
NASA Technical Reports Server (NTRS)
Corrigan, Bob (Technical Monitor); DeLaat, John C.; Chang, Clarence T.
2003-01-01
Active control of high-frequency (greater than 500 Hz) combustion instability has been demonstrated in the NASA single-nozzle combustor rig at United Technologies Research Center. The combustor rig emulates an actual engine instability and has many of the complexities of a real engine combustor (i.e. actual fuel nozzle and swirler, dilution cooling, etc.) In order to demonstrate control, a high-frequency fuel valve capable of modulating the fuel flow at up to 1kHz was developed. Characterization of the fuel delivery system was accomplished in a custom dynamic flow rig developed for that purpose. Two instability control methods, one model-based and one based on adaptive phase-shifting, were developed and evaluated against reduced order models and a Sectored-1-dimensional model of the combustor rig. Open-loop fuel modulation testing in the rig demonstrated sufficient fuel modulation authority to proceed with closed-loop testing. During closed-loop testing, both control methods were able to identify the instability from the background noise and were shown to reduce the pressure oscillations at the instability frequency by 30%. This is the first known successful demonstration of high-frequency combustion instability suppression in a realistic aero-engine environment. Future plans are to carry these technologies forward to demonstration on an advanced low-emission combustor.
Aruru, Meghana V.; Salmon, J. Warren
2013-01-01
Background Medicare Part D, the senior prescription drug benefit plan, was introduced through the Medicare Modernization Act of 2003. Medicare beneficiaries receive information about plan options through multiple sources, and it is often assumed by consumer health plans and healthcare providers that beneficiaries can understand and compare plan information. Medicare beneficiaries are older, may have cognitive problems, and may not have a true understanding of managed care. They are more likely than younger persons to have inadequate health literacy, thereby demonstrating significant gaps in knowledge and information about healthcare. Objective To develop a Medicare Beneficiary Comprehension Test (MBCT) to evaluate Medicare beneficiaries' understanding of Part D plan concepts, as presented in the 2008 Medicare & You handbook. Methods A 10-question MBCT was developed using a case-vignette approach that required beneficiaries to read portions of the Medicare & You handbook and answer Part D–related questions associated with healthcare decision-making. The test was divided into 2 sections: (I) insurance concepts and (II) utilization management/appeals and grievances to cover standard terminology, as well as newer utilization management and appeals and grievances procedures that are unique to Part D. The test was administered to 100 beneficiaries at 2 sites—a university geriatrics clinic and a private retirement facility. Beneficiaries were tested for cognition and health literacy before being administered the test. Results The mean score on the MBCT was 3.5 of a maximum of 5, with no statistical difference found between both sites. Ten faculty members and 4 graduate students assessed the content validity of the instrument using a 4-point Likert rating rubric. The construct validity of the instrument was assessed using a principal components analysis with varimax rotation. The principal components analysis yielded 4 factors that were labeled as “Plan D concepts,” “managed care/utilization management,” “cost-sharing,” and “plan comparisons.” The factor analysis indicated that the test is multidimensional and did measure the construct. Conclusions Medicare beneficiaries' understanding of Part D may play a key role in the management of their drug use and health and the associated outcomes. The MBCT and its pending revisions can be administered to beneficiaries with differing health outcomes. Medicare beneficiaries are often faced with several pieces of information involving a complex array of choices amidst bewildering plan options. It is crucial that beneficiaries and/or their family members involved in the decision-making process understand the plan benefits to truly make an informed decision. As the number of Medicare beneficiaries increases over the coming years with the baby boomers, it becomes even more imperative that the elderly have improved access to treatments that can achieve desirable outcomes. Measuring comprehension by Medicare beneficiaries may be an initial step toward understanding more complex issues, such as treatment adherence, decision-making, and, ultimately, trends in healthcare utilization and outcomes. PMID:24991375
Controlled Impact Demonstration
1984-12-01
The Controlled Impact Demonstration (or colloquially the Crash In the Desert) was a joint project between NASA and the Federal Aviation Administration (FAA) that intentionally crashed a remotely controlled Boeing 720 aircraft to acquire data and test new technologies that might help passengers and crew survive. The crash required more than four years of preparation by NASA Ames Research Center, Langley Research Center, Dryden Flight Research Center, the FAA, and General Electric. After numerous test runs, the plane was crashed on December 1, 1984. The test went generally according to plan, and produced a spectacular fireball that required more than an hour to extinguish. The FAA concluded that about one-quarter of the passengers would have survived, that the antimisting kerosene test fuel did not sufficiently reduce the risk of fire, and that several changes to equipment in the passenger compartment of aircraft were needed. NASA concluded that a head-up display and with microwave landing system would have helped the pilot more safely fly the aircraft.
The Hyper-X Flight Systems Validation Program
NASA Technical Reports Server (NTRS)
Redifer, Matthew; Lin, Yohan; Bessent, Courtney Amos; Barklow, Carole
2007-01-01
For the Hyper-X/X-43A program, the development of a comprehensive validation test plan played an integral part in the success of the mission. The goal was to demonstrate hypersonic propulsion technologies by flight testing an airframe-integrated scramjet engine. Preparation for flight involved both verification and validation testing. By definition, verification is the process of assuring that the product meets design requirements; whereas validation is the process of assuring that the design meets mission requirements for the intended environment. This report presents an overview of the program with emphasis on the validation efforts. It includes topics such as hardware-in-the-loop, failure modes and effects, aircraft-in-the-loop, plugs-out, power characterization, antenna pattern, integration, combined systems, captive carry, and flight testing. Where applicable, test results are also discussed. The report provides a brief description of the flight systems onboard the X-43A research vehicle and an introduction to the ground support equipment required to execute the validation plan. The intent is to provide validation concepts that are applicable to current, follow-on, and next generation vehicles that share the hybrid spacecraft and aircraft characteristics of the Hyper-X vehicle.
Multi-KW dc distribution system technology research study
NASA Technical Reports Server (NTRS)
Dawson, S. G.
1978-01-01
The Multi-KW DC Distribution System Technology Research Study is the third phase of the NASA/MSFC study program. The purpose of this contract was to complete the design of the integrated technology test facility, provide test planning, support test operations and evaluate test results. The subjet of this study is a continuation of this contract. The purpose of this continuation is to study and analyze high voltage system safety, to determine optimum voltage levels versus power, to identify power distribution system components which require development for higher voltage systems and finally to determine what modifications must be made to the Power Distribution System Simulator (PDSS) to demonstrate 300 Vdc distribution capability.
GOES-R L1b Readiness Implementation and Management Plan
NASA Technical Reports Server (NTRS)
Kunkee, David; Farley, Robert; Kwan, Betty; Walterscheid, Richard; Hecht, James; Claudepierre, Seth.; De Luccia, Frank
2017-01-01
A complement of Readiness, Implementation and Management Plans (RIMPs) to facilitate management of post-launch product test activities for the official Geostationary Operational Environmental Satellite (GOES-R) Level 1b (L1b) products have been developed and documented. Separate plans have been created for each of the GOES-R sensors including: the Advanced Baseline Imager (ABI), the Extreme ultraviolet and X-ray Irradiance Sensors (EXIS), Geostationary Lightning Mapper (GLM), GOES-R Magnetometer (MAG), the Space Environment In-Situ Suite (SEISS), and the Solar Ultraviolet Imager (SUVI). The GOES-R program has implemented these RIMPs in order to address the full scope of CalVal activities required for a successful demonstration of GOES-R L1b data product quality throughout the three validation stages: Beta, Provisional and Full Validation. For each product maturity level, the RIMPs include specific performance criteria and required artifacts that provide evidence a given validation stage has been reached, the timing when each stage will be complete, a description of every applicable Post-Launch Product Test (PLPT), roles and responsibilities of personnel, upstream dependencies, and analysis methods and tools to be employed during validation. Instrument level Post-Launch Tests (PLTs) are also referenced and apply primarily to functional check-out of the instruments.
NASA Technical Reports Server (NTRS)
Kunkee, David B.; Farley, Robert W.; Kwan, Betty P.; Hecht, James H.; Walterscheid, Richard L.; Claudepierre, Seth G.; Bishop, Rebecca L.; Gelinas, Lynette J.; Deluccia, Frank J.
2017-01-01
A complement of Readiness, Implementation and Management Plans (RIMPs) to facilitate management of post-launch product test activities for the official Geostationary Operational Environmental Satellite (GOES-R) Level 1b (L1b) products have been developed and documented. Separate plans have been created for each of the GOES-R sensors including: the Advanced Baseline Imager (ABI), the Extreme ultraviolet and X-ray Irradiance Sensors (EXIS), Geostationary Lightning Mapper (GLM), GOES-R Magnetometer (MAG), the Space Environment In-Situ Suite (SEISS), and the Solar Ultraviolet Imager (SUVI). The GOES-R program has implemented these RIMPs in order to address the full scope of CalVal activities required for a successful demonstration of GOES-R L1b data product quality throughout the three validation stages: Beta, Provisional and Full Validation. For each product maturity level, the RIMPs include specific performance criteria and required artifacts that provide evidence a given validation stage has been reached, the timing when each stage will be complete, a description of every applicable Post-Launch Product Test (PLPT), roles and responsibilities of personnel, upstream dependencies, and analysis methods and tools to be employed during validation. Instrument level Post-Launch Tests (PLTs) are also referenced and apply primarily to functional check-out of the instruments.
X-33 Reusable Launch Vehicle Demonstrator, Spaceport and Range
NASA Technical Reports Server (NTRS)
Letchworth, Gary F.
2011-01-01
The X-33 was a suborbital reusable spaceplane demonstrator, in development from 1996 to early 2001. The intent of the demonstrator was to lower the risk of building and operating a full-scale reusable vehicle fleet. Reusable spaceplanes offered the potential to lower the cost of access to space by an order of magnitude, compared with conventional expendable launch vehicles. Although a cryogenic tank failure during testing ultimately led to the end of the effort, the X-33 team celebrated many successes during the development. This paper summarizes some of the accomplishments and milestones of this X-vehicle program, from the perspective of an engineer who was a member of the team throughout the development. X-33 Program accomplishments include rapid, flight hardware design, subsystem testing and fabrication, aerospike engine development and testing, Flight Operations Center and Operations Control Center ground systems design and construction, rapid Environmental Impact Statement NEPA process approval, Range development and flight plan approval for test flights, and full-scale system concept design and refinement. Lessons from the X-33 Program may have potential application to new RLV and other aerospace systems being developed a decade later.
NESHAP Annual Report for CY 2015 Sandia National Laboratories Tonopah Test Range
DOE Office of Scientific and Technical Information (OSTI.GOV)
Evelo, Stacie
2016-05-01
This National Emission Standards for Hazardous Air Pollutants (NESHAP) Annual Report has been prepared in a format to comply with the reporting requirements of 40 CFR 61.94 and the April 5, 1995 Memorandum of Agreement (MOA) between the Department of Energy (DOE) and the Environmental Protection Agency (EPA). According to the EPA approved NESHAP Monitoring Plan for the Tonopah Test Range (TTR), 40 CFR 61, subpart H, and the MOA, no additional monitoring or measurements are required at TTR in order to demonstrate compliance with the NESHAP regulation.
Hesari, Nikou; Kıratlı Yılmazçoban, Nursel; Elzein, Mohamad; Alum, Absar; Abbaszadegan, Morteza
2017-01-03
Rapid bacterial detection using biosensors is a novel approach for microbiological testing applications. Validation of such methods is an obstacle in the adoption of new bio-sensing technologies for water testing. Therefore, establishing a quality assurance and quality control (QA/QC) plan is essential to demonstrate accuracy and reliability of the biosensor method for the detection of E. coli in drinking water samples. In this study, different reagents and assay conditions including temperatures, holding time, E. coli strains and concentrations, dissolving agents, salinity and pH effects, quality of substrates of various suppliers of 4-methylumbelliferyl glucuronide (MUG), and environmental water samples were included in the QA/QC plan and used in the assay optimization and documentation. Furthermore, the procedural QA/QC for the monitoring of drinking water samples was established to validate the performance of the biosensor platform for the detection of E. coli using a culture-based standard technique. Implementing the developed QA/QC plan, the same level of precision and accuracy was achieved using both the standard and the biosensor methods. The established procedural QA/QC for the biosensor will provide a reliable tool for a near real-time monitoring of E. coli in drinking water samples to both industry and regulatory authorities.
Simulation-Based Cryosurgery Intelligent Tutoring System Prototype.
Sehrawat, Anjali; Keelan, Robert; Shimada, Kenji; Wilfong, Dona M; McCormick, James T; Rabin, Yoed
2016-04-01
As a part of an ongoing effort to develop computerized training tools for cryosurgery, the current study presents a proof of concept for a computerized tool for cryosurgery tutoring. The tutoring system lists geometrical constraints of cryoprobes placement, simulates cryoprobe insertion, displays a rendered shape of the prostate, enables distance measurements, simulates the corresponding thermal history, and evaluates the mismatch between the target region shape and a preselected planning isotherm. The quality of trainee planning is measured in comparison with a computer-generated planning, created for each case study by previously developed planning algorithms. The following two versions of the tutoring system have been tested in the current study: (1) an unguided version, where the trainee can practice cases in unstructured sessions and (2) an intelligent tutoring system, which forces the trainee to follow specific steps, believed by the authors to potentially shorten the learning curve. Although the tutoring level in this study aims only at geometrical constraints on cryoprobe placement and the resulting thermal histories, it creates a unique opportunity to gain insight into the process outside the operation room. Post-test results indicate that the intelligent tutoring system may be more beneficial than the nonintelligent tutoring system, but the proof of concept is demonstrated with either system. © The Author(s) 2015.
Hesari, Nikou; Kıratlı Yılmazçoban, Nursel; Elzein, Mohamad; Alum, Absar; Abbaszadegan, Morteza
2017-01-01
Rapid bacterial detection using biosensors is a novel approach for microbiological testing applications. Validation of such methods is an obstacle in the adoption of new bio-sensing technologies for water testing. Therefore, establishing a quality assurance and quality control (QA/QC) plan is essential to demonstrate accuracy and reliability of the biosensor method for the detection of E. coli in drinking water samples. In this study, different reagents and assay conditions including temperatures, holding time, E. coli strains and concentrations, dissolving agents, salinity and pH effects, quality of substrates of various suppliers of 4-methylumbelliferyl glucuronide (MUG), and environmental water samples were included in the QA/QC plan and used in the assay optimization and documentation. Furthermore, the procedural QA/QC for the monitoring of drinking water samples was established to validate the performance of the biosensor platform for the detection of E. coli using a culture-based standard technique. Implementing the developed QA/QC plan, the same level of precision and accuracy was achieved using both the standard and the biosensor methods. The established procedural QA/QC for the biosensor will provide a reliable tool for a near real-time monitoring of E. coli in drinking water samples to both industry and regulatory authorities. PMID:28054956
NASA Astrophysics Data System (ADS)
Budiman, Kholiq; Prahasto, Toni; Kusumawardhani, Amie
2018-02-01
This research has applied an integrated design and development of planning information system, which is been designed using Enterprise Architecture Planning. Frequent discrepancy between planning and realization of the budget that has been made, resulted in ineffective planning, is one of the reason for doing this research. The design using EAP aims to keep development aligned and in line with the strategic direction of the organization. In the practice, EAP is carried out in several stages of the planning initiation, identification and definition of business functions, proceeded with architectural design and EA implementation plan that has been built. In addition to the design of the Enterprise Architecture, this research carried out the implementation, and was tested by several methods of black box and white box. Black box testing method is used to test the fundamental aspects of the software, tested by two kinds of testing, first is using User Acceptance Testing and the second is using software functionality testing. White box testing method is used to test the effectiveness of the code in the software, tested using unit testing. Tests conducted using white box and black box on the integrated planning information system, is declared successful. Success in the software testing can not be ascertained if the software built has not shown any distinction from prior circumstance to the development of this integrated planning information system. For ensuring the success of this system implementation, the authors test consistency between the planning of data and the realization of prior-use of the information system, until after-use information system. This consistency test is done by reducing the time data of the planning and realization time. From the tabulated data, the planning information system that has been built reduces the difference between the planning time and the realization time, in which indicates that the planning information system can motivate the planner unit in realizing the budget that has been designed. It also proves that the value chain of the information planning system has brought implications for budget realization.
NASA Technical Reports Server (NTRS)
Schifer, Nicholas A.; Oriti, Salvatore M.
2013-01-01
The NASA Glenn Research Center (GRC) has been testing 100 We class, free-piston Stirling convertors for potential use in Stirling Radioisotope Power Systems (RPS) for space science and exploration missions. Free-piston Stirling convertors are capable of achieving a 38% conversion efficiency, making Stirling attractive for meeting future power system needs in light of the shrinking U.S. plutonium fuel supply. Convertors currently on test include four Stirling Technology Demonstration Convertors (TDCs), manufactured by the Stirling Technology Company (STC), and six Advanced Stirling Convertors (ASCs), manufactured by Sunpower, Inc. Total hours of operation is greater than 514,000 hours (59 years). Several tests have been initiated to demonstrate the functionality of Stirling convertors for space applications, including: in-air extended operation, thermal vacuum extended operation. Other tests have also been conducted to characterize Stirling performance in anticipated mission scenarios. Data collected during testing has been used to support life and reliability estimates, drive design changes and improve quality, and plan for expected mission scenarios. This paper will provide a summary of convertors tested at NASA GRC and discuss lessons learned through extended testing.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Fakir, H.; Gaede, S.; Mulligan, M.
Purpose: To design a versatile, nonhomogeneous insert for the dose verification phantom ArcCHECK{sup Trade-Mark-Sign} (Sun Nuclear Corp., FL) and to demonstrate its usefulness for the verification of dose distributions in inhomogeneous media. As an example, we demonstrate it can be used clinically for routine quality assurance of two volumetric modulated arc therapy (VMAT) systems for lung stereotactic body radiation therapy (SBRT): SmartArc{sup Registered-Sign} (Pinnacle{sup 3}, Philips Radiation Oncology Systems, Fitchburg, WI) and RapidArc{sup Registered-Sign} (Eclipse{sup Trade-Mark-Sign }, Varian Medical Systems, Palo Alto, CA). Methods: The cylindrical detector array ArcCHECK{sup Trade-Mark-Sign} has a retractable homogeneous acrylic insert. In this work, wemore » designed and manufactured a customized heterogeneous insert with densities that simulate soft tissue, lung, bone, and air. The insert offers several possible heterogeneity configurations and multiple locations for point dose measurements. SmartArc{sup Registered-Sign} and RapidArc{sup Registered-Sign} plans for lung SBRT were generated and copied to ArcCHECK{sup Trade-Mark-Sign} for each inhomogeneity configuration. Dose delivery was done on a Varian 2100 ix linac. The evaluation of dose distributions was based on gamma analysis of the diode measurements and point doses measurements at different positions near the inhomogeneities. Results: The insert was successfully manufactured and tested with different measurements of VMAT plans. Dose distributions measured with the homogeneous insert showed gamma passing rates similar to our clinical results ({approx}99%) for both treatment-planning systems. Using nonhomogeneous inserts decreased the passing rates by up to 3.6% in the examples studied. Overall, SmartArc{sup Registered-Sign} plans showed better gamma passing rates for nonhomogeneous measurements. The discrepancy between calculated and measured point doses was increased up to 6.5% for the nonhomogeneous insert depending on the inhomogeneity configuration and measurement location. SmartArc{sup Registered-Sign} and RapidArc{sup Registered-Sign} plans had similar plan quality but RapidArc{sup Registered-Sign} plans had significantly higher monitor units (up to 70%). Conclusions: A versatile, nonhomogeneous insert was developed for ArcCHECK{sup Trade-Mark-Sign} for an easy and quick evaluation of dose calculations with nonhomogeneous media and for comparison of different treatment planning systems. The device was tested for SmartArc{sup Registered-Sign} and RapidArc{sup Registered-Sign} plans for lung SBRT, showing the uncertainties of dose calculations with inhomogeneities. The new insert combines the convenience of the ArcCHECK{sup Trade-Mark-Sign} and the possibility of assessing dose distributions in inhomogeneous media.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Cao, Y; Li, R; Chi, Z
Purpose: To compare the performances of four commercial treatment planning systems (TPS) used for the intensity-modulated radiotherapy (IMRT). Methods: Ten patients of nasopharyngeal (4 cases), esophageal (3 cases) and cervical (3 cases) cancer were randomly selected from a 3-month IMRT plan pool at one radiotherapy center. For each patient, four IMRT plans were newly generated by using four commercial TPS (Corvus, Monaco, Pinnacle and Xio), and then verified with Matrixx (two-dimensional array/IBA Company) on Varian23EX accelerator. A pass rate (PR) calculated from the Gamma index by OminiPro IMRT 1.5 software was evaluated at four plan verification standards (1%/1mm, 2%/2mm, 3%/3mm,more » 4%/4mm and 5%/5mm) for each treatment plan. Overall and multiple pairwise comparisons of PRs were statistically conducted by analysis of covariance (ANOVA) F and LSD tests among four TPSs. Results: Overall significant (p>0.05) differences of PRs were found among four TPSs with F test values of 3.8 (p=0.02), 21.1(>0.01), 14.0 (>0.01), 8.3(>0.01) at standards of 1%/1mm to 4%/4mm respectively, except at 5%/5mm standard with 2.6 (p=0.06). All means (standard deviation) of PRs at 3%/3mm of 94.3 ± 3.3 (Corvus), 98.8 ± 0.8 (Monaco), 97.5± 1.7 (Pinnacle), 98.4 ± 1.0 (Xio) were above 90% and met clinical requirement. Multiple pairwise comparisons had not demonstrated a consistent low or high pattern on either TPS. Conclusion: Matrixx dose verification results show that the validation pass rates of Monaco and Xio plans are relatively higher than those of the other two; Pinnacle plan shows slight higher pass rate than Corvus plan; lowest pass rate was achieved by the Corvus plan among these four kinds of TPS.« less
NASA Technical Reports Server (NTRS)
Morey, W. W.
1984-01-01
This report covers the development and testing of a prototype combustor viewing system. The system allows one to see and record images from the inside of an operating gas turbine combustor. The program proceeded through planned phases of conceptual design, preliminary testing to resolve problem areas, prototype design and fabrication, and rig testing. Successful tests were completed with the viewing system in the laboratory, in a high pressure combustor rig, and on a Pratt and Whitney PW20307 jet engine. Both film and video recordings were made during the tests. Digital image analysis techniques were used to enhance images and bring out special effects. The use of pulsed laser illumination was also demonstrated as a means for observing liner surfaces in the presence of luminous flame.
ISTAR: Project Status and Ground Test Engine Design
NASA Technical Reports Server (NTRS)
Quinn, Jason Eugene
2003-01-01
Review of the current technical and programmatic status of the Integrated System Test of an Airbreathing Rocket (ISTAR) project. November 2002 completed Phase 1 of this project: which worked the conceptual design of the X-43B demonstrator vehicle and Flight Test Engine (FTE) order to develop realistic requirements for the Ground Test Engine (GTE). The latest conceptual FTE and X-43B configuration is briefly reviewed. The project plan is to reduce risk to the GTE and FTE concepts through several tests: thruster, fuel endothermic characterization, engine structure/heat exchanger, injection characterization rig, and full scale direct connect combustion rig. Each of these will be discussed along with the project schedule. This discussion is limited due to ITAR restrictions on open literature papers.
Electric utility acid fuel cell stack technology advancement
NASA Astrophysics Data System (ADS)
Congdon, J. V.; Goller, G. J.; Greising, G. J.; Obrien, J. J.; Randall, S. A.; Sandelli, G. J.; Breault, R. D.; Austin, G. W.; Bopse, S.; Coykendall, R. D.
1984-11-01
The principal effort under this program was directed at the fuel cell stack technology required to accomplish the initial feasibility demonstrations of increased cell stack operating pressures and temperatures, increased cell active area, incorporation of the ribbed substrate cell configuration at the bove conditions, and the introduction of higher performance electrocatalysts. The program results were successful with the primary accomplishments being: (1) fabrication of 10 sq ft ribbed substrate, cell components including higher performing electrocatalysts; (2) assembly of a 10 sq ft, 30-cell short stack; and (3) initial test of this stack at 120 psia and 405 F. These accomplishments demonstrate the feasibility of fabricating and handling large area cells using materials and processes that are oriented to low cost manufacture. An additional accomplishment under the program was the testing of two 3.7 sq ft short stacks at 12 psia/405 F to 5400 and 4500 hours respectively. These tests demonstrate the durability of the components and the cell stack configuration to a nominal 5000 hours at the higher pressure and temperature condition planned for the next electric utility power plant.
Electric utility acid fuel cell stack technology advancement
NASA Technical Reports Server (NTRS)
Congdon, J. V.; Goller, G. J.; Greising, G. J.; Obrien, J. J.; Randall, S. A.; Sandelli, G. J.; Breault, R. D.; Austin, G. W.; Bopse, S.; Coykendall, R. D.
1984-01-01
The principal effort under this program was directed at the fuel cell stack technology required to accomplish the initial feasibility demonstrations of increased cell stack operating pressures and temperatures, increased cell active area, incorporation of the ribbed substrate cell configuration at the bove conditions, and the introduction of higher performance electrocatalysts. The program results were successful with the primary accomplishments being: (1) fabrication of 10 sq ft ribbed substrate, cell components including higher performing electrocatalysts; (2) assembly of a 10 sq ft, 30-cell short stack; and (3) initial test of this stack at 120 psia and 405 F. These accomplishments demonstrate the feasibility of fabricating and handling large area cells using materials and processes that are oriented to low cost manufacture. An additional accomplishment under the program was the testing of two 3.7 sq ft short stacks at 12 psia/405 F to 5400 and 4500 hours respectively. These tests demonstrate the durability of the components and the cell stack configuration to a nominal 5000 hours at the higher pressure and temperature condition planned for the next electric utility power plant.
NASA Technical Reports Server (NTRS)
1973-01-01
The launch operations test and checkout plan is a planning document that establishes all launch site checkout activity, including the individual tests and sequence of testing required to fulfill the development center and KSC test and checkout requirements. This volume contains the launch vehicle test and checkout plan encompassing S-1B, S-4B, IU stage, and ground support equipment tests. The plan is based upon AS-208 flow utilizing a manned spacecraft, LUT 1, and launch pad 39B facilities.
Evaluation of the Medicare Competition Demonstrations
Langwell, Kathryn M.; Hadley, James P.
1989-01-01
A summary of findings from the Evaluation of the Medicare Competition Demonstrations is presented in this article. The purpose of this evaluation was to examine the implementation and operational experiences of the 26 health maintenance organizations that operated as demonstrations from 1983 to 1985, their experiences in marketing their plans, the factors that affected beneficiaries' decisions to join or not join a plan, the extent to which beneficiaries were satisfied with their choice of plans, the quality of care provided by the plans, and the impact of the demonstrations on Medicare beneficiaries' use and cost of services. PMID:10313459
DOE Office of Scientific and Technical Information (OSTI.GOV)
GOLDBERG, H.J.
1999-05-18
The Waste Receiving and Processing (WRAP) Facility will store uranium and transuranic (TRU) sources and standards for certification that WRAP meets the requirements of the Quality Assurance Program Plan (QAPP) for the Waste Isolation Pilot Plant (WIPP). In addition, WRAP must meet internal requirements for testing and validation of measuring instruments for nondestructive assay (NDA). In order to be certified for WIPP, WRAP will participate in the NDA Performance Demonstration Program (PDP). This program is a blind test of the NDA capabilities for TRU waste. It is intended to ensure that the NDA capabilities of this facility satisfy the requirementsmore » of the quality assurance program plan for the WIPP. The PDP standards have been provided by the Los Alamos National Laboratory (LANL) for this program. These standards will be used in the WRAP facility.« less
Resilient off-grid microgrids: Capacity planning and N-1 security
Madathil, Sreenath Chalil; Yamangil, Emre; Nagarajan, Harsha; ...
2017-06-13
Over the past century the electric power industry has evolved to support the delivery of power over long distances with highly interconnected transmission systems. Despite this evolution, some remote communities are not connected to these systems. These communities rely on small, disconnected distribution systems, i.e., microgrids to deliver power. However, as microgrids often are not held to the same reliability standards as transmission grids, remote communities can be at risk for extended blackouts. To address this issue, we develop an optimization model and an algorithm for capacity planning and operations of microgrids that include N-1 security and other practical modelingmore » features like AC power flow physics, component efficiencies and thermal limits. Lastly, we demonstrate the computational effectiveness of our approach on two test systems; a modified version of the IEEE 13 node test feeder and a model of a distribution system in a remote community in Alaska.« less
Resilient off-grid microgrids: Capacity planning and N-1 security
DOE Office of Scientific and Technical Information (OSTI.GOV)
Madathil, Sreenath Chalil; Yamangil, Emre; Nagarajan, Harsha
Over the past century the electric power industry has evolved to support the delivery of power over long distances with highly interconnected transmission systems. Despite this evolution, some remote communities are not connected to these systems. These communities rely on small, disconnected distribution systems, i.e., microgrids to deliver power. However, as microgrids often are not held to the same reliability standards as transmission grids, remote communities can be at risk for extended blackouts. To address this issue, we develop an optimization model and an algorithm for capacity planning and operations of microgrids that include N-1 security and other practical modelingmore » features like AC power flow physics, component efficiencies and thermal limits. Lastly, we demonstrate the computational effectiveness of our approach on two test systems; a modified version of the IEEE 13 node test feeder and a model of a distribution system in a remote community in Alaska.« less
OPALS: Mission System Operations Architecture for an Optical Communications Demonstration on the ISS
NASA Technical Reports Server (NTRS)
Abrahamson, Matthew J.; Sindiy, Oleg V.; Oaida, Bogdan V.; Fregoso, Santos; Bowles-Martinez, Jessica N.; Kokorowski, Michael; Wilkerson, Marcus W.; Konyha, Alexander L.
2014-01-01
In spring 2014, the Optical PAyload for Lasercomm Science (OPALS) will launch to the International Space Station (ISS) to demonstrate space-to-ground optical communications. During a 90-day baseline mission, OPALS will downlink high quality, short duration videos to the Optical Communications Telescope Laboratory (OCTL) in Wrightwood, California. To achieve mission success, interfaces to the ISS payload operations infrastructure are established. For OPALS, the interfaces facilitate activity planning, hazardous laser operations, commanding, and telemetry transmission. In addition, internal processes such as pointing prediction and data processing satisfy the technical requirements of the mission. The OPALS operations team participates in Operational Readiness Tests (ORTs) with external partners to exercise coordination processes and train for the overall mission. The tests have provided valuable insight into operational considerations on the ISS.
T55 power turbine rotor multiplane-multispeed balancing study
NASA Technical Reports Server (NTRS)
Martin, M. R.
1982-01-01
A rotordynamic analysis of the T55-L-11C engine was used to evaluate the balancing needs of the power turbine and to optimize the balancing procedure. As a result, recommendations were made for implementation of a multiplane-multispeed balancing plan. Precision collars for the attachment of trial weights to a slender rotor were designed enabling demonstration balancing on production hardware. The quality of the balance was then evaluated by installing a high speed balanced power turbine in an engine and running in a test cell at the Corpus Christi Army depot. The engine used had been tested prior to the turbine changeout and showed acceptable overall vibration levels for the engine were significantly reduced, demonstrating the ability of multiplane-multispeed balancing to control engine vibration.
Sodium-sulfur Cell Technology Flight Experiment (SSCT)
NASA Technical Reports Server (NTRS)
Halbach, Carl R.
1992-01-01
The sodium-sulfur battery is emerging as a prime high-temperature energy storage technology for space flight applications. A Na-S cell demonstration is planned for a 1995-96 NASA Space Shuttle flight which focuses on the microgravity effects on individual cells. The experiment is not optimized for battery performance as such. Rather, it maximizes the variety of operating conditions which the Na-S cell is capable of in a relatively short 5-day flight. The demonstration is designed to reveal the effects of microgravity by comparison with ground test control cells experiencing identical test conditions but with gravity. Specifically, limitations of transport dynamics and associated cell performance characteristics should be revealed. The Na-S Cell Technology Flight Experiment consists of three separate experiments designed to determine cell operating characteristics, detailed electrode kinetics and reactant distributions.
Flight Testing of Terrain-Relative Navigation and Large-Divert Guidance on a VTVL Rocket
NASA Technical Reports Server (NTRS)
Trawny, Nikolas; Benito, Joel; Tweddle, Brent; Bergh, Charles F.; Khanoyan, Garen; Vaughan, Geoffrey M.; Zheng, Jason X.; Villalpando, Carlos Y.; Cheng, Yang; Scharf, Daniel P.;
2015-01-01
Since 2011, the Autonomous Descent and Ascent Powered-Flight Testbed (ADAPT) has been used to demonstrate advanced descent and landing technologies onboard the Masten Space Systems (MSS) Xombie vertical-takeoff, vertical-landing suborbital rocket. The current instantiation of ADAPT is a stand-alone payload comprising sensing and avionics for terrain-relative navigation and fuel-optimal onboard planning of large divert trajectories, thus providing complete pin-point landing capabilities needed for planetary landers. To this end, ADAPT combines two technologies developed at JPL, the Lander Vision System (LVS), and the Guidance for Fuel Optimal Large Diverts (G-FOLD) software. This paper describes the integration and testing of LVS and G-FOLD in the ADAPT payload, culminating in two successful free flight demonstrations on the Xombie vehicle conducted in December 2014.
Dynamic Response Testing in an Electrically Heated Reactor Test Facility
NASA Astrophysics Data System (ADS)
Bragg-Sitton, Shannon M.; Morton, T. J.
2006-01-01
Non-nuclear testing can be a valuable tool in the development of a space nuclear power or propulsion system. In a non-nuclear test bed, electric heaters are used to simulate the heat from nuclear fuel. Standard testing allows one to fully assess thermal, heat transfer, and stress related attributes of a given system, but fails to demonstrate the dynamic response that would be present in an integrated, fueled reactor system. The integration of thermal hydraulic hardware tests with simulated neutronic response provides a bridge between electrically heated testing and fueled nuclear testing. By implementing a neutronic response model to simulate the dynamic response that would be expected in a fueled reactor system, one can better understand system integration issues, characterize integrated system response times and response characteristics, and assess potential design improvements at a relatively small fiscal investment. Initial system dynamic response testing was demonstrated on the integrated SAFE-100a heat pipe (HP) cooled, electrically heated reactor and heat exchanger hardware, utilizing a one-group solution to the point kinetics equations to simulate the expected neutronic response of the system. Reactivity feedback calculations were then based on a bulk reactivity feedback coefficient and measured average core temperature. This paper presents preliminary results from similar dynamic testing of a direct drive gas cooled reactor system (DDG), demonstrating the applicability of the testing methodology to any reactor type and demonstrating the variation in system response characteristics in different reactor concepts. Although the HP and DDG designs both utilize a fast spectrum reactor, the method of cooling the reactor differs significantly, leading to a variable system response that can be demonstrated and assessed in a non-nuclear test facility. Planned system upgrades to allow implementation of higher fidelity dynamic testing are also discussed. Proposed DDG testing will utilize a higher fidelity point kinetics model to control core power transients, and reactivity feedback will be based on localized feedback coefficients and several independent temperature measurements taken within the core block. This paper presents preliminary test results and discusses the methodology that will be implemented in follow-on DDG testing and the additional instrumentation required to implement high fidelity dynamic testing.
NASA Technical Reports Server (NTRS)
1976-01-01
The quality assurance program demonstrates recognition of the quality aspects and an organized approach to achieve them. It ensures that quality requirements are determined and satisfied throughout all phases of contract performance, including preliminary and engineering design, development, fabrication, processing, assembly, inspection, test, checkout, packaging, shipping, storage, maintenance field use, flight preparations, flight operations and post-flight analysis, as applicable.
Lightweight Towed Howitzer Demonstrator. Phase 1 and Partial Phase 2. Volume A. Overview.
1987-04-01
Reliability Floyd Manson............................... Test Plans Errol Quick................................. Systems Engrnq Coordi nati on Bob Schmidt ...FMC Structur*1 Verification o Beam stress calculations on the supporting trails which allow 70kpsi in a quasi-isotropic lay up of graphite epoxy...addressed utilizing a damage tolerant design criteria. o Strength calculations are questionable because of the dry room temperature values used. The
Ubiquitous Robotic Technology for Smart Manufacturing System.
Wang, Wenshan; Zhu, Xiaoxiao; Wang, Liyu; Qiu, Qiang; Cao, Qixin
2016-01-01
As the manufacturing tasks become more individualized and more flexible, the machines in smart factory are required to do variable tasks collaboratively without reprogramming. This paper for the first time discusses the similarity between smart manufacturing systems and the ubiquitous robotic systems and makes an effort on deploying ubiquitous robotic technology to the smart factory. Specifically, a component based framework is proposed in order to enable the communication and cooperation of the heterogeneous robotic devices. Further, compared to the service robotic domain, the smart manufacturing systems are often in larger size. So a hierarchical planning method was implemented to improve the planning efficiency. A test bed of smart factory is developed. It demonstrates that the proposed framework is suitable for industrial domain, and the hierarchical planning method is able to solve large problems intractable with flat methods.
Ubiquitous Robotic Technology for Smart Manufacturing System
Zhu, Xiaoxiao; Wang, Liyu; Qiu, Qiang; Cao, Qixin
2016-01-01
As the manufacturing tasks become more individualized and more flexible, the machines in smart factory are required to do variable tasks collaboratively without reprogramming. This paper for the first time discusses the similarity between smart manufacturing systems and the ubiquitous robotic systems and makes an effort on deploying ubiquitous robotic technology to the smart factory. Specifically, a component based framework is proposed in order to enable the communication and cooperation of the heterogeneous robotic devices. Further, compared to the service robotic domain, the smart manufacturing systems are often in larger size. So a hierarchical planning method was implemented to improve the planning efficiency. A test bed of smart factory is developed. It demonstrates that the proposed framework is suitable for industrial domain, and the hierarchical planning method is able to solve large problems intractable with flat methods. PMID:27446206
Automatic learning-based beam angle selection for thoracic IMRT
DOE Office of Scientific and Technical Information (OSTI.GOV)
Amit, Guy; Marshall, Andrea; Purdie, Thomas G., E-mail: tom.purdie@rmp.uhn.ca
Purpose: The treatment of thoracic cancer using external beam radiation requires an optimal selection of the radiation beam directions to ensure effective coverage of the target volume and to avoid unnecessary treatment of normal healthy tissues. Intensity modulated radiation therapy (IMRT) planning is a lengthy process, which requires the planner to iterate between choosing beam angles, specifying dose–volume objectives and executing IMRT optimization. In thorax treatment planning, where there are no class solutions for beam placement, beam angle selection is performed manually, based on the planner’s clinical experience. The purpose of this work is to propose and study a computationallymore » efficient framework that utilizes machine learning to automatically select treatment beam angles. Such a framework may be helpful for reducing the overall planning workload. Methods: The authors introduce an automated beam selection method, based on learning the relationships between beam angles and anatomical features. Using a large set of clinically approved IMRT plans, a random forest regression algorithm is trained to map a multitude of anatomical features into an individual beam score. An optimization scheme is then built to select and adjust the beam angles, considering the learned interbeam dependencies. The validity and quality of the automatically selected beams evaluated using the manually selected beams from the corresponding clinical plans as the ground truth. Results: The analysis included 149 clinically approved thoracic IMRT plans. For a randomly selected test subset of 27 plans, IMRT plans were generated using automatically selected beams and compared to the clinical plans. The comparison of the predicted and the clinical beam angles demonstrated a good average correspondence between the two (angular distance 16.8° ± 10°, correlation 0.75 ± 0.2). The dose distributions of the semiautomatic and clinical plans were equivalent in terms of primary target volume coverage and organ at risk sparing and were superior over plans produced with fixed sets of common beam angles. The great majority of the automatic plans (93%) were approved as clinically acceptable by three radiation therapy specialists. Conclusions: The results demonstrated the feasibility of utilizing a learning-based approach for automatic selection of beam angles in thoracic IMRT planning. The proposed method may assist in reducing the manual planning workload, while sustaining plan quality.« less
NASA Astrophysics Data System (ADS)
1990-10-01
The current magnetohydrodynamic MHD program being implemented is a result of a consensus established in public meetings held by the Department of Energy in 1984. The public meetings were followed by the formulation of a June 1984 Coal-Fired MHD Preliminary Transition and Program Plan. This plan focused on demonstrating the proof-of-concept (POC) of coal-fired MHD electric power plants by the early 1990s. MHD test data indicate that while there are no fundamental technical barriers impeding the development of MHD power plants, technical risk remains. To reduce the technical risk three key subsystems (topping cycle, bottoming cycle, and seed regeneration) are being assembled and tested separately. The program does not require fabrication of a complete superconducting magnet, but rather the development and testing of superconductor cables. The topping cycle system test objectives can be achieved using a conventional iron core magnet system already in place at a DOE facility. Systems engineering-derived requirements and analytical modeling to support scale-up and component design guide the program. In response to environmental, economic, engineering, and utility acceptance requirements, design choices and operating modes are tested and refined to provide technical specifications for meeting commercial criteria. These engineering activities are supported by comprehensive and continuing systems analyses to establish realistic technical requirements and cost data. Essential elements of the current program are to: develop technical and environmental data for the integrated MHD topping cycle and bottoming cycle systems through POC testing (1000 and 4000 hours, respectively); design, construct, and operate a POC seed regeneration system capable of processing spent seed materials from the MHD bottoming cycle; prepare conceptual designs for a site specific MHD retrofit plant; and continue supporting research necessary for system testing.
Full-Scale Accident Testing in Support of Used Nuclear Fuel Transportation.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Durbin, Samuel G.; Lindgren, Eric R.; Rechard, Rob P.
2014-09-01
The safe transport of spent nuclear fuel and high-level radioactive waste is an important aspect of the waste management system of the United States. The Nuclear Regulatory Commission (NRC) currently certifies spent nuclear fuel rail cask designs based primarily on numerical modeling of hypothetical accident conditions augmented with some small scale testing. However, NRC initiated a Package Performance Study (PPS) in 2001 to examine the response of full-scale rail casks in extreme transportation accidents. The objectives of PPS were to demonstrate the safety of transportation casks and to provide high-fidelity data for validating the modeling. Although work on the PPSmore » eventually stopped, the Blue Ribbon Commission on America’s Nuclear Future recommended in 2012 that the test plans be re-examined. This recommendation was in recognition of substantial public feedback calling for a full-scale severe accident test of a rail cask to verify evaluations by NRC, which find that risk from the transport of spent fuel in certified casks is extremely low. This report, which serves as the re-assessment, provides a summary of the history of the PPS planning, identifies the objectives and technical issues that drove the scope of the PPS, and presents a possible path for moving forward in planning to conduct a full-scale cask test. Because full-scale testing is expensive, the value of such testing on public perceptions and public acceptance is important. Consequently, the path forward starts with a public perception component followed by two additional components: accident simulation and first responder training. The proposed path forward presents a series of study options with several points where the package performance study could be redirected if warranted.« less
The Yo-Yo IR2 test: physiological response, reliability, and application to elite soccer.
Oberacker, Lisa M; Davis, Shala E; Haff, G Gregory; Witmer, Chad A; Moir, Gavin L
2012-10-01
The purpose of this study was to compare the effects of resistance training performed on either a stable or unstable surface on performance tests in female soccer players. Nineteen National Collegiate Athletic Association Division II female soccer players were assigned to either an unstable training group (UST: 19.0 ± 0.47 years; 1.69 ± 6.4 m; 67.8 ± 7.7 kg) or a stable training group (ST: 19.6 ± 0.49 years; 1.64 ± 3.2 m; 62.7 ± 6.27 kg). Player positions were distributed evenly between the groups. Both the groups followed a 5-week periodized resistance training program designed to develop maximum muscular strength. The groups performed the same exercises during each workout, with the UST performing 2 of the exercises in each session on an unstable surface. Pretraining and posttraining measures of straight-line sprint speed, planned and reactive agility, aerobic capacity, and countermovement vertical jump (CMJ) were taken. Significant main effects for time were reported for straight-line sprint speed, planned agility, and reactive agility with both groups demonstrating improvements during the posttraining testing session. The ST demonstrated a significant increase in CMJ during the posttraining session (change in mean: 0.04 m) in contrast to the decline demonstrated by the UST (change in mean: -0.01 m). Performing resistance training exercises on an unstable surface confers no advantage over traditional resistance training exercises for improving the speed, agility, and aerobic capacity of female soccer players. Furthermore, the use of an unstable surface may inhibit the effects of resistance training on vertical jump height, an important variable in soccer performance.
Kron, Tomas; Chesson, Brent; Hardcastle, Nicholas; Crain, Melissa; Clements, Natalie; Burns, Mark; Ball, David
2018-05-01
A randomised clinical trial comparing stereotactic ablative body radiotherapy (SABR) with conventional radiotherapy for early stage lung cancer has been conducted in Australia and New Zealand under the auspices of the TransTasman Radiation Oncology Group (NCT01014130). We report on the technical credentialing program as prerequisite for centres joining the trial. Participating centres were asked to develop treatment plans for two test cases to assess their ability to create plans according to protocol. Dose delivery in the presence of inhomogeneity and motion was assessed during a site visit using a phantom with moving inserts. Site visits for the trial were conducted in 16 Australian and 3 New Zealand radiotherapy facilities. The tests with low density inhomogeneities confirmed shortcomings of the AAA algorithm for dose calculation. Dose was assessed for a typical treatment delivery including at least one non-coplanar beam in a stationary and moving phantom. This end-to-end test confirmed that all participating centres were able to deliver stereotactic ablative body radiotherapy with the required accuracy while the planning study demonstrated that they were able to produce acceptable plans for both test cases. The credentialing process documented that participating centres were able to deliver dose as required in the trial protocol. It also gave an opportunity to provide education about the trial and discuss technical issues such as four-dimensional CT, small field dosimetry and patient immobilisation with staff in participating centres. Advances in knowledge: Credentialing is an important quality assurance tool for radiotherapy trials using advanced technology. In addition to confirming technical competence, it provides an opportunity for education and discussion about the trial.
Film-based delivery quality assurance for robotic radiosurgery: Commissioning and validation.
Blanck, Oliver; Masi, Laura; Damme, Marie-Christin; Hildebrandt, Guido; Dunst, Jürgen; Siebert, Frank-Andre; Poppinga, Daniela; Poppe, Björn
2015-07-01
Robotic radiosurgery demands comprehensive delivery quality assurance (DQA), but guidelines for commissioning of the DQA method is missing. We investigated the stability and sensitivity of our film-based DQA method with various test scenarios and routine patient plans. We also investigated the applicability of tight distance-to-agreement (DTA) Gamma-Index criteria. We used radiochromic films with multichannel film dosimetry and re-calibration and our analysis was performed in four steps: 1) Film-to-plan registration, 2) Standard Gamma-Index criteria evaluation (local-pixel-dose-difference ≤2%, distance-to-agreement ≤2 mm, pass-rate ≥90%), 3) Dose distribution shift until maximum pass-rate (Maxγ) was found (shift acceptance <1 mm), and 4) Final evaluation with tight DTA criteria (≤1 mm). Test scenarios consisted of purposefully introduced phantom misalignments, dose miscalibrations, and undelivered MU. Initial method evaluation was done on 30 clinical plans. Our method showed similar sensitivity compared to the standard End-2-End-Test and incorporated an estimate of global system offsets in the analysis. The simulated errors (phantom shifts, global robot misalignment, undelivered MU) were detected by our method while standard Gamma-Index criteria often did not reveal these deviations. Dose miscalibration was not detected by film alone, hence simultaneous ion-chamber measurement for film calibration is strongly recommended. 83% of the clinical patient plans were within our tight DTA tolerances. Our presented methods provide additional measurements and quality references for film-based DQA enabling more sensitive error detection. We provided various test scenarios for commissioning of robotic radiosurgery DQA and demonstrated the necessity to use tight DTA criteria. Copyright © 2015 Associazione Italiana di Fisica Medica. Published by Elsevier Ltd. All rights reserved.
Lengerich, Eugene J; Kluhsman, Brenda C; Bencivenga, Marcyann; Allen, Regina; Miele, Mary Beth; Farace, Elana
2007-09-01
In 2002, 10.4% of the 10 million persons alive who have ever been diagnosed with cancer had colorectal cancer (CRC). Barriers, such as distance, terrain, access to care and cultural differences, to CRC survivorship may be especially relevant in rural communities. We tested the hypothesis that teams from rural cancer coalitions and hospitals would develop a Community Plan (CP) to enhance CRC survivorship. We used community-based participatory research and the PRECEDE-PROCEED model to train teams from rural cancer coalitions and hospitals in Pennsylvania and New York. We measured knowledge at three points in time and tested the change with McNemar's test, corrected for multiple comparisons (p < 0.0167). We also conducted a qualitative review of the CP contents. Fourteen (93.3%) of the 15 coalitions or hospitals initially recruited to the study completed a CP. Knowledge in public health, sponsorship of A National Action Plan for Cancer Survivorship, and CRC survivorship and treatment increased. Teams identified perceived barriers and community assets. All teams planned to increase awareness of community assets and almost all planned to enhance treatment-related care and psychosocial care for the CRC survivor; 50% planned to enhance primary care and CRC screening. The study demonstrated the interest and ability of rural organizations to plan to enhance CRC survivorship, including linkage of CRC survivorship to primary care. Rural cancer coalitions and hospitals may be a vehicle to develop local action for A National Action Plan. Access to more comprehensive care for CRC cancer survivors in rural communities appears to be facilitated by the community-based initiative described and investigated in this study. Efforts such as these could be replicated in other rural communities and may impact the care and quality of life of survivors with many types of cancers. While access to health services may be increased through community-based initiatives, we still need to measure the impact of such initiatives on the long term health and well being of cancer survivors in rural locations.
14 CFR 437.25 - Flight test plan.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 14 Aeronautics and Space 4 2014-01-01 2014-01-01 false Flight test plan. 437.25 Section 437.25... TRANSPORTATION LICENSING EXPERIMENTAL PERMITS Requirements to Obtain an Experimental Permit Flight Test Plan § 437.25 Flight test plan. An applicant must— (a) Describe any flight test program, including estimated...
14 CFR 437.25 - Flight test plan.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 14 Aeronautics and Space 4 2013-01-01 2013-01-01 false Flight test plan. 437.25 Section 437.25... TRANSPORTATION LICENSING EXPERIMENTAL PERMITS Requirements to Obtain an Experimental Permit Flight Test Plan § 437.25 Flight test plan. An applicant must— (a) Describe any flight test program, including estimated...
14 CFR 437.25 - Flight test plan.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 14 Aeronautics and Space 4 2012-01-01 2012-01-01 false Flight test plan. 437.25 Section 437.25... TRANSPORTATION LICENSING EXPERIMENTAL PERMITS Requirements to Obtain an Experimental Permit Flight Test Plan § 437.25 Flight test plan. An applicant must— (a) Describe any flight test program, including estimated...
Code of Federal Regulations, 2010 CFR
2010-07-01
... 30 Mineral Resources 2 2010-07-01 2010-07-01 false Testing Plan. 282.23 Section 282.23 Mineral... § 282.23 Testing Plan. All testing activities shall be conducted in accordance with a Testing Plan..., to carry out a pilot program to evaluate processing techniques or technology or mining equipment, or...
NASA Technical Reports Server (NTRS)
Pride, J. D.
1986-01-01
The testing conducted on LaRC-developed hardware for the controlled impact demonstration transport aircraft is discussed. To properly develop flight qualified crash systems, two environments were considered: the aircraft flight environment with the focus on vibration and temperature effects, and the crash environment with the long pulse shock effects. Also with the large quantity of fuel in the wing tanks the possibility of fire was considered to be a threat to data retrieval and thus fire tests were included in the development test process. The aircraft test successfully demonstrated the performance of the LaRC developed heat shields. Good telemetered data (S-band) was received during the impact and slide-out phase, and even after the aircraft came to rest. The two onboard DAS tape recorders were protected from the intense fire and high quality tape data was recovered. The complete photographic system performed as planned throughout the 40.0 sec of film supply. The four photo power distribution pallets remained in good condition and all ten onboard 16 mm high speed (400 frames/sec) cameras produced good film data.
DiCenzo, Jodi
2007-01-01
Behavioral research has made important, relevant contributions to retirement saving and investing. This work has cast a new light on participant behavior and its underpinnings: By and large, individuals are inert--with good intentions, poor follow-through, and bounded rationality. Loss aversion and decision-making biases often lead to unfortunate outcomes, including a poorly funded retirement. Further, behavioral economists have demonstrated that education and communication programs alone may not be effective in changing behavior. Instead, with their behavioral insights, they have offered new retirement plan design alternatives and empirically tested their efficacy in overcoming identified suboptimal behavior. These efforts are helping to pave a path of least resistance that should lead to greater retirement security. The Pension Protection Act of 2006 appears to support these alternatives by providing incentives to plan sponsors that implement automatic features such as automatic enrollment and deferral rate escalation. It also allows plan sponsors to choose more aggressive investment defaults. Perhaps implicit in this support is some advice to sponsors to accept participant behavior and to think more about changing their own by embracing automatic plan features.
Robust and Opportunistic Autonomous Science for a Potential Titan Aerobot
NASA Technical Reports Server (NTRS)
Gaines, Daniel M.; Estlin, Tara; Schaffer, Steve; Castano, Rebecca; Elfes, Alberto
2010-01-01
We are developing onboard planning and execution technologies to provide robust and opportunistic mission operations for a potential Titan aerobot. Aerobot have the potential for collecting a vast amount of high priority science data. However, to be effective, an aerobot must address several challenges including communication constraints, extended periods without contact with Earth, uncertain and changing environmental conditions, maneuverability constraints and potentially short-lived science opportunities. We are developing the AerOASIS system to develop and test technology to support autonomous science operations for a potential Titan Aerobot. The planning and execution component of AerOASIS is able to generate mission operations plans that achieve science and engineering objectives while respecting mission and resource constraints as well as adapting the plan to respond to new science opportunities. Our technology leverages prior work on the OASIS system for autonomous rover exploration. In this paper we describe how the OASIS planning component was adapted to address the unique challenges of a Titan Aerobot and we describe a field demonstration of the system with the JPL prototype aerobot.
Wavelength routing beyond the standard graph coloring approach
NASA Astrophysics Data System (ADS)
Blankenhorn, Thomas
2004-04-01
When lightpaths are routed in the planning stage of transparent optical networks, the textbook approach is to use algorithms that try to minimize the overall number of wavelengths used in the . We demonstrate that this method cannot be expected to minimize actual costs when the marginal cost of instlling more wavelengths is a declining function of the number of wavelengths already installed, as is frequently the case. We further demonstrate how cost optimization can theoretically be improved with algorithms based on Prim"s algorithm. Finally, we test this theory with simulaion on a series of actual network topologies, which confirm the theoretical analysis.
Construction in space - Toward a fresh definition of the man/machine relation
NASA Technical Reports Server (NTRS)
Watters, H. H.; Stokes, J. W.
1979-01-01
The EVA (extravehicular activity) project forming part of the space construction process is reviewed. The manual EVA constuction, demonstrated by the crew of Skylab 3 by assembling a modest space structure in the form of the twin-pole sunshade, is considered, indicating that the experiment dispelled many doubts about man's ability to execute routine and contingency EVA operations. Tests demonstrating the feasibility of remote teleoperator rendezvous, station keeping, and docking operations, using hand controllers for direct input and television for feedback, are noted. Future plans for designing space construction machines are mentioned.
The influence of various test plans on mission reliability. [for Shuttle Spacelab payloads
NASA Technical Reports Server (NTRS)
Stahle, C. V.; Gongloff, H. R.; Young, J. P.; Keegan, W. B.
1977-01-01
Methods have been developed for the evaluation of cost effective vibroacoustic test plans for Shuttle Spacelab payloads. The shock and vibration environments of components have been statistically represented, and statistical decision theory has been used to evaluate the cost effectiveness of five basic test plans with structural test options for two of the plans. Component, subassembly, and payload testing have been performed for each plan along with calculations of optimum test levels and expected costs. The tests have been ranked according to both minimizing expected project costs and vibroacoustic reliability. It was found that optimum costs may vary up to $6 million with the lowest plan eliminating component testing and maintaining flight vibration reliability via subassembly tests at high acoustic levels.
An Overview of NASA's In-Space Cryogenic Propellant Management Technologies
NASA Technical Reports Server (NTRS)
Tucker, Stephen; Hastings, Leon; Haynes, Davy (Technical Monitor)
2001-01-01
Future mission planning within NASA continues to include cryogenic propellants for in space transportation, with mission durations ranging from days to years. Between 1995 and the present, NASA has pursued a diversified program of ground-based testing to prepare the various technologies associated with in-space cryogenic fluid management (CFM) for implementation. CFM technology areas being addressed include passive insulation, zero gravity pressure control, zero gravity mass gauging, capillary liquid acquisition devices, and zero boiloff storage. NASA CFM technologies are planned, coordinated, and implemented through the Cryogenic Technology Working Group which is comprised of representatives from the various NASA Centers as well as the National Institute of Standards and Technologies (NIST) and, on selected occasions, the Air Force. An overview of the NASA program and Marshall Space Flight Center (MSFC) roles, accomplishments, and near-term activities are presented herein. Basic CFM technology areas being addressed include passive insulation, zero gravity pressure control, zero gravity mass gauging, capillary liquid acquisition devices, and zero boiloff storage. Recent MSFC accomplishments include: the large scale demonstration of a high performance variable density multilayer insulation (MLI) that reduced the boiloff by about half that of standard MLI; utilization of a foam substrate under MLI to eliminate the need for a helium purge bag system; demonstrations of both spray-bar and axial-jet mixer concepts for zero gravity pressure control; and sub-scale testing that verified an optical sensor concept for measuring liquid hydrogen mass in zero gravity. In response to missions requiring cryogenic propellant storage durations on the order of years, a cooperative effort by NASA's Ames Research Center, Glenn Research Center, and MSFC has been implemented to develop and demonstrate zero boiloff concepts for in-space storage of cryogenic propellants. An MSFC contribution to this cooperative effort is a large-scale demonstration of the integrated operation of passive insulation, destratification/pressure control, and cryocooler (commercial unit) subsystems to achieve zero boiloff storage of liquid hydrogen. Testing is expected during the Summer of 2001.
TANK 18-F AND 19-F TANK FILL GROUT SCALE UP TEST SUMMARY
DOE Office of Scientific and Technical Information (OSTI.GOV)
Stefanko, D.; Langton, C.
2012-01-03
High-level waste (HLW) tanks 18-F and 19-F have been isolated from FTF facilities. To complete operational closure the tanks will be filled with grout for the purpose of: (1) physically stabilizing the tanks, (2) limiting/eliminating vertical pathways to residual waste, (3) entombing waste removal equipment, (4) discouraging future intrusion, and (5) providing an alkaline, chemical reducing environment within the closure boundary to control speciation and solubility of select radionuclides. This report documents the results of a four cubic yard bulk fill scale up test on the grout formulation recommended for filling Tanks 18-F and 19-F. Details of the scale upmore » test are provided in a Test Plan. The work was authorized under a Technical Task Request (TTR), HLE-TTR-2011-008, and was performed according to Task Technical and Quality Assurance Plan (TTQAP), SRNL-RP-2011-00587. The bulk fill scale up test described in this report was intended to demonstrate proportioning, mixing, and transportation, of material produced in a full scale ready mix concrete batch plant. In addition, the material produced for the scale up test was characterized with respect to fresh properties, thermal properties, and compressive strength as a function of curing time.« less
Laser diode arrays for naval reconnaissance
NASA Astrophysics Data System (ADS)
Holloway, John H., Jr.; Crosby, Frank J.; Petee, Danny A.; Suiter, Harold R.; Witherspoon, Ned H.
2003-09-01
The Airborne Littoral Reconnaissance Technologies (ALRT) Project has demonstrated a nighttime operational minefield detection capability using commercial off-the-shelf high-power Laser Diode Arrays (LDAs). Historically, optical aerial detection of minefields has primarily been limited to daytime operations but LDAs promise compact and efficient lighting to allow for enhanced reconnaissance operations for future mine detection systems. When combined with high-resolution intensified imaging systems, LDAs can illuminate otherwise unseen areas. Future wavelength options will open the way for active multispectral imaging with LDAs. The Coastal Systems Station working for the Office of Naval Research on the ALRT project has designed, developed, integrated, and tested both prototype and commercial arrays from a Cessna airborne platform. Detailed test results show the ability to detect several targets of interest in a variety of background conditions. Initial testing of the prototype arrays, reported on last year, was completed and further investigations of the commercial versions were performed. Polarization-state detection studies were performed, and advantageous properties of the source-target-sensor geometry noted. Current project plans are to expand the field-of-view coverage for Naval exercises in the summer of 2003. This paper describes the test collection, data library products, array information, on-going test analysis results, and future planned testing of the LDAs.
Development of 3-D Ice Accretion Measurement Method
NASA Technical Reports Server (NTRS)
Lee, Sam; Broeren, Andy P.; Addy, Harold E., Jr.; Sills, Robert; Pifer, Ellen M.
2012-01-01
A research plan is currently being implemented by NASA to develop and validate the use of a commercial laser scanner to record and archive fully three-dimensional (3-D) ice shapes from an icing wind tunnel. The plan focused specifically upon measuring ice accreted in the NASA Icing Research Tunnel (IRT). The plan was divided into two phases. The first phase was the identification and selection of the laser scanning system and the post-processing software to purchase and develop further. The second phase was the implementation and validation of the selected system through a series of icing and aerodynamic tests. Phase I of the research plan has been completed. It consisted of evaluating several scanning hardware and software systems against an established selection criteria through demonstrations in the IRT. The results of Phase I showed that all of the scanning systems that were evaluated were equally capable of scanning ice shapes. The factors that differentiated the scanners were ease of use and the ability to operate in a wide range of IRT environmental conditions.
Liu, Y S; Li, Z; Zhao, Y J; Ye, H Q; Zhou, Y Q; Hu, W J; Liu, Y S; Xun, C L; Zhou, Y S
2018-02-18
To develop a digital workflow of orthodontic-prosthodontic multidisciplinary treatment plan which can be applied in complicated anterior teeth esthetic rehabilitation, in order to enhance the efficiency of communication between dentists and patients, and improve the predictability of treatment outcome. Twenty patients with the potential needs of orthodontic-prosthodontic multidisciplinary treatment to solve their complicated esthetic problems in anterior teeth were recruited in this study. Digital models of patients' both dental arches and soft tissues were captured using intra oral scanner. Direct prosthodontic (DP) treatment plan and orthodontic-prosthodontic (OP) treatment plan were carried out for each patient. For DP treatment plans, digital wax-up models were directly designed on original digital models using prosthodontic design system. For OP treatment plans, virtual-setups were performed using orthodontic analyze system according to orthodontic and esthetic criteria and imported to prosthodontic design system to finalize the digital wax-up models. These two treatment plans were shown to the patients and demonstrated elaborately. Each patient rated two treatment plans using visual analogue scales and the medians of scores of two treatment plans were analyzed using signed Wilcoxon test. Having taken into consideration various related factors, including time, costs of treatment, each patient chose a specific treatment plan. For the patients chose DP treatment plans, digital wax-up models were exported and printed into resin diagnostic models which would be utilized in the prosthodontic treatment process. For the patients chose OP treatment plans, virtual-setups were used to fabricate aligners or indirect bonding templates and digital wax-up models were also exported and printed into resin diagnostic models for prosthodontic treatment after orthodontic treatment completed. The medians of scores of DP treatment plan and OP treatment plan were calculated and analyzed by IBM SPSS 20. The median of scores of DP treatment plan was 8.4, the minimum value was 6.9 and the maximum value was 9.3. The median of scores of OP treatment plan was 9.0, the minimum value was 7.9 and the maximum value was 9.6. The median of scores of OP was significantly higher than that of DP (Z=-3.23, P<0.01). Finally, 12 patients chose OP treatment plans and 8 patients chose DP treatment plans. For cases with complex esthetic problems in anterior teeth, a digital workflow can demonstrate final treatment outcome and help patients make suitable treatment decisions. In our study, the orthodontic-prosthodontic multidisciplinary treatment plan is feasible which can provide predictions of treatment outcome and improve esthetic outcome with patients' satisfaction.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Schonewill, Philip P.; Russell, Renee L.; Daniel, Richard C.
The Low Activity Waste Pretreatment System (LAWPS) is being designed to enable the direct feed of waste to the Hanford Tank Waste Treatment and Immobilization Plant (WTP) Low Activity Waste (LAW) facility to be immobilized. Prior to construction of the LAWPS, pilot-scale integrated testing of the key unit operations (crossflow filtration, ion exchange using spherical resorcinol-formaldehyde (sRF) resin) will be conducted by a team led by Washington River Protection Solutions (WRPS) to increase the technology maturation level of the facility’s critical technology elements. As a part of this effort, Pacific Northwest National Laboratory (PNNL) has conducted a series of bench-scalemore » (or engineering-scale) tests to perform two major objectives: (1) support pilot-scale integrated testing of the LAWPS by supplying information or performance data in advance of operating the pilot-scale facility; and (2) collect data needed to establish or confirm assumptions/approaches planned for implementation in the LAWPS safety basis. The first objective was focused in two technical areas: developing simulants that are representative of expected waste feed and can be produced at larger scales, and using these simulants in a bench-scale crossflow filter to establish expected solid-liquid separation performance. The crossflow filter was also used to observe the efficacy (with respect to filter production rate) of selected operational strategies. The second objective also included two technical areas: measuring the effect of sRF resin on hydrogen generation rate under irradiation, and demonstrating that the planned hydrogen management approach is effective and robust. The hydrogen management strategy involves fluidization of the sRF resin bed in the ion exchange columns and recirculating the liquid, a scenario that is planned for testing at full column height. The full height tests at PNNL also supported full-scale IX column testing conducted as part of the technology maturation plan. The experimental approaches used at PNNL in these four technical areas are summarized and selected key preliminary results are provided.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Im, Piljae; Bhandari, Mahabir S.; New, Joshua Ryan
This document describes the Oak Ridge National Laboratory (ORNL) multiyear experimental plan for validation and uncertainty characterization of whole-building energy simulation for a multi-zone research facility using a traditional rooftop unit (RTU) as a baseline heating, ventilating, and air conditioning (HVAC) system. The project’s overarching objective is to increase the accuracy of energy simulation tools by enabling empirical validation of key inputs and algorithms. Doing so is required to inform the design of increasingly integrated building systems and to enable accountability for performance gaps between design and operation of a building. The project will produce documented data sets that canmore » be used to validate key functionality in different energy simulation tools and to identify errors and inadequate assumptions in simulation engines so that developers can correct them. ASHRAE Standard 140, Method of Test for the Evaluation of Building Energy Analysis Computer Programs (ASHRAE 2004), currently consists primarily of tests to compare different simulation programs with one another. This project will generate sets of measured data to enable empirical validation, incorporate these test data sets in an extended version of Standard 140, and apply these tests to the Department of Energy’s (DOE) EnergyPlus software (EnergyPlus 2016) to initiate the correction of any significant deficiencies. The fitness-for-purpose of the key algorithms in EnergyPlus will be established and demonstrated, and vendors of other simulation programs will be able to demonstrate the validity of their products. The data set will be equally applicable to validation of other simulation engines as well.« less
The Affordable Care Act and health insurance exchanges: effects on the pediatric dental benefit.
Orynich, C Ashley; Casamassimo, Paul S; Seale, N Sue; Reggiardo, Paul; Litch, C Scott
2015-01-01
To examine the relationship between state health insurance Exchange selection and pediatric dental benefit design, regulation and cost. Medical and dental plans were analyzed across three types of state health insurance Exchanges: State-based (SB), State-partnered (SP), and Federally-facilitated (FF). Cost-analysis was completed for 10,427 insurance plans, and health policy expert interviews were conducted. One-way ANOVA compared the cost-sharing structure of stand-alone dental plans (SADP). T-test statistics compared differences in average total monthly pediatric premium costs. No causal relationships were identified between Exchange selection and the pediatric dental benefit's design, regulation or cost. Pediatric medical and dental coverage offered through the embedded plan design exhibited comparable average total monthly premium costs to aggregate cost estimates for the separately purchased SADP and traditional medical plan (P=0.11). Plan designs and regulatory policies demonstrated greater correlation between the SP and FF Exchanges, as compared to the SB Exchange. Parameters defining the pediatric dental benefit are complex and vary across states. Each state Exchange was subject to barriers in improving the quality of the pediatric dental benefit due to a lack of defined, standardized policy parameters and further legislative maturation is required.
Treatment planning for heavy ion radiotherapy: clinical implementation and application.
Jäkel, O; Krämer, M; Karger, C P; Debus, J
2001-04-01
The clinical implementation and application of a novel treatment planning system (TPS) for scanned ion beams is described, which is in clinical use for carbon ion treatments at the German heavy ion facility (GSI). All treatment plans are evaluated on the basis of biologically effective dose distributions. For therapy control, in-beam positron emission tomography (PET) and an online monitoring system for the beam intensity and position are used. The absence of a gantry restricts the treatment plans to horizontal beams. Most of the treatment plans consist of two nearly opposing lateral fields or sometimes orthogonal fields. In only a very few cases a single beam was used. For patients with very complex target volumes lateral and even distal field patching techniques were applied. Additional improvements can be achieved when the patient's head is fixed in a tilted position, in order to achieve sparing of the organs at risk. In order to test the stability of dose distributions in the case of patient misalignments we routinely simulate the effects of misalignments for patients with critical structures next to the target volume. The uncertainties in the range calculation are taken into account by a margin around the target volume of typically 2-3 mm, which can, however, be extended if the simulation demonstrates larger deviations. The novel TPS developed for scanned ion beams was introduced into clinical routine in December 1997 and was used for the treatment planning of 63 patients with head and neck tumours until July 2000. Planning strategies and methods were developed for this tumour location that facilitate the treatment of a larger number of patients with the scanned heavy ion beam in a clinical setting. Further developments aim towards a simultaneous optimization of the treatment field intensities and more effective procedures for the patient set-up. The results demonstrate that ion beams can be integrated into a clinical environment for treatment planning and delivery.
HYPERSAMP - HYPERGEOMETRIC ATTRIBUTE SAMPLING SYSTEM BASED ON RISK AND FRACTION DEFECTIVE
NASA Technical Reports Server (NTRS)
De, Salvo L. J.
1994-01-01
HYPERSAMP is a demonstration of an attribute sampling system developed to determine the minimum sample size required for any preselected value for consumer's risk and fraction of nonconforming. This statistical method can be used in place of MIL-STD-105E sampling plans when a minimum sample size is desirable, such as when tests are destructive or expensive. HYPERSAMP utilizes the Hypergeometric Distribution and can be used for any fraction nonconforming. The program employs an iterative technique that circumvents the obstacle presented by the factorial of a non-whole number. HYPERSAMP provides the required Hypergeometric sample size for any equivalent real number of nonconformances in the lot or batch under evaluation. Many currently used sampling systems, such as the MIL-STD-105E, utilize the Binomial or the Poisson equations as an estimate of the Hypergeometric when performing inspection by attributes. However, this is primarily because of the difficulty in calculation of the factorials required by the Hypergeometric. Sampling plans based on the Binomial or Poisson equations will result in the maximum sample size possible with the Hypergeometric. The difference in the sample sizes between the Poisson or Binomial and the Hypergeometric can be significant. For example, a lot size of 400 devices with an error rate of 1.0% and a confidence of 99% would require a sample size of 400 (all units would need to be inspected) for the Binomial sampling plan and only 273 for a Hypergeometric sampling plan. The Hypergeometric results in a savings of 127 units, a significant reduction in the required sample size. HYPERSAMP is a demonstration program and is limited to sampling plans with zero defectives in the sample (acceptance number of zero). Since it is only a demonstration program, the sample size determination is limited to sample sizes of 1500 or less. The Hypergeometric Attribute Sampling System demonstration code is a spreadsheet program written for IBM PC compatible computers running DOS and Lotus 1-2-3 or Quattro Pro. This program is distributed on a 5.25 inch 360K MS-DOS format diskette, and the program price includes documentation. This statistical method was developed in 1992.
Wen, Ning; Kim, Joshua; Doemer, Anthony; Glide-Hurst, Carri; Chetty, Indrin J; Liu, Chang; Laugeman, Eric; Xhaferllari, Ilma; Kumarasiri, Akila; Victoria, James; Bellon, Maria; Kalkanis, Steve; Siddiqui, M Salim; Movsas, Benjamin
2018-06-01
The purpose of this study was to investigate the systematic localization accuracy, treatment planning capability, and delivery accuracy of an integrated magnetic resonance imaging guided Linear Accelerator (MR-Linac) platform for stereotactic radiosurgery. The phantom for the end-to-end test comprises three different compartments: a rectangular MR/CT target phantom, a Winston-Lutz cube, and a rectangular MR/CT isocenter phantom. Hidden target tests were performed at gantry angles of 0, 90, 180, and 270 degrees to quantify the systematic accuracy. Five patient plans with a total of eleven lesions were used to evaluate the dosimetric accuracy. Single-isocenter IMRT treatment plans using 10-15 coplanar beams were generated to treat the multiple metastases. The end-to-end localization accuracy of the system was 1.0 ± 0.1 mm. The conformity index, homogeneity index and gradient index of the plans were 1.26 ± 0.22, 1.22 ± 0.10, and 5.38 ± 1.44, respectively. The average absolute point dose difference between measured and calculated dose was 1.64 ± 1.90%, and the mean percentage of points passing the 3%/1 mm gamma criteria was 96.87%. Our experience demonstrates that excellent plan quality and delivery accuracy was achievable on the MR-Linac for treating multiple brain metastases with a single isocenter. Copyright © 2018 Elsevier B.V. All rights reserved.
SU-E-T-76: A Software System to Monitor VMAT Plan Complexity in a Large Radiotherapy Centre
DOE Office of Scientific and Technical Information (OSTI.GOV)
Arumugam, S; Xing, A; Ingham Institute, Sydney, NSW
2015-06-15
Purpose: To develop a system that analyses and reports the complexity of Volumetric Modulated Arc Therapy (VMAT) plans to aid in the decision making for streamlining patient specific dosimetric quality assurance (QA) tests. Methods: A software system, Delcheck, was developed in-house to calculate VMAT plan and delivery complexity using the treatment delivery file. Delcheck has the functionality to calculate multiple plan complexity metrics including the Li-Xing Modulation Index (LI-MI), multiplicative combination of Leaf Travel and Modulation Complexity Score (LTMCSv), Monitor Units per prescribed dose (MU/D) and the delivery complexity index (MIt) that incorporates the modulation of dose rate, leaf speedmore » and gantry speed. Delcheck includes database functionality to store and compare plan metrics for a specified treatment site. The overall plan and delivery complexity is assessed based on the 95% conformance limit of the complexity metrics as Similar, More or Less complex. The functionality of the software was tested using 42 prostate conventional, 10 prostate SBRT and 15 prostate bed VMAT plans generated for an Elekta linear accelerator. Results: The mean(σ) of LI-MI for conventional, SBRT and prostate bed plans were 1690(486), 3215.4(1294) and 3258(982) respectively. The LTMCSv of the studied categories were 0.334(0.05), 0.325(0.07) and 0.3112(0.09). The MU/D of the studied categories were 2.4(0.4), 2.7(0.7) and 2.5(0.5). The MIt of the studied categories were 21.6(3.4), 18.2(3.0) and 35.9(6.6). The values of the complexity metrics show that LI-MI appeared to resolve the plan complexity better than LTMCSv and MU/D. The MIt value increased as the delivery complexity increased. Conclusion: The developed software was shown to be working as expected. In studied treatment categories Prostate bed plans are more complex in both plan and delivery and SBRT is more complex in plan and less complex in delivery as demonstrated by LI-MI and MIt. This project was funded through a Cancer Council NSW Project Grant (RG14-11)« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Le, A; Jiang, S; Timmerman, R
Purpose: To demonstrate the feasibility of using CBCT in a real-time image guided radiation therapy (IGRT) for single fraction heterotopic ossification (HO) in patients after hip replacement. In this real-time procedure, all steps, from simulation, imaging, planning to treatment delivery, are performed at the treatment unit in one appointment time slot. This work promotes real-time treatment to create a paradigm shift in the single fraction radiation therapy. Methods: An integrated real-time IGRT for HO was developed and tested for radiation treatment of heterotopic ossification for patient after hip replacement. After CBCT images are acquired at the linac, and sent tomore » the treatment planning system, the physician determines the field and/or draws a block. Subsequently, a simple 2D AP/PA plan with prescription of 700 cGy is created on-the-fly for physician to review. Once the physician approves the plan, the patient is treated on the same simulation position. This real-time treatment requires the team of attending physician, physicist, therapists, and dosimetrist to work in harmony to achieve all the steps in a timely manner. Results: Ten patients have been treated with this real-time treatment, having the same beams arrangement treatment plan and prescription as our clinically regular CT-based 2D plans. The average time for these procedures are 52.9 ±10.7 minutes from the time patient entered the treatment room until s/he exited, and 37.7 ±8.6 minutes from starting CBCT until last beam delivered. Conclusion: The real-time IGRT for HO treatment has been tested and implemented to be a clinically accepted procedure. This one-time appointment greatly enhances the waiting time, especially when patients in high level of pain, and provides a convenient approach for the whole clinical staff. Other disease sites will be also tested with this new technology.« less
Poster - 34: Clinical Implementation of Prone Breast Treatment
DOE Office of Scientific and Technical Information (OSTI.GOV)
Jiang, Runqing; Fleming, Katrina; Kobeleva, Sofya
2016-08-15
Purpose: Prone breast treatment is used to reduce acute and late toxicities for large or pendulous breast patients. This study developed and implemented the clinical workflow of prone breast radiotherapy treatment. Methods: Varian kVue Access360™ Prone Breast Couchtop was used as prone breast board. The treatment planning (TP)is performed in Eclipse TP system. TP comparisons between supine deep inspiration breathing hold (DIBH) and prone breast; prone forward field-in-field (FinF) planning and inverse IMRT planning were performed and discussed. For the daily setup, breast coverage was assessed in the room using light field and MV imaging was used at day 1more » and weekly. Results: The first ten patients are CT scanned and planned both supine and prone. The coverage was all excellent for supine DIBH plan and prone breast plan. The plan in the prone position demonstrated improvements in lung sparing comparing to the DIBH plan. Both forward FinF plan and inverse IMRT plan achieved acceptable coverage of the breast, and heart dose is comparable. Considering the daily setup variations and MLC leakage, forward FinF plan was recommended for routine clinical use. The procedure has been tested in phantom and patients were treated clinically. Conclusions: Prone breast irradiation has been advocated for women with large pendulous breasts in order to decrease acute and late toxicities. The workflow for prone breast radiation therapy has been developed and the technique is ready to treat patients.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Zhou, Y; Tan, J; Jiang, S
Purpose: High dose rate (HDR) brachytherapy treatment planning is conventionally performed in a manual fashion. Yet it is highly desirable to perform computerized automated planning to improve treatment planning efficiency, eliminate human errors, and reduce plan quality variation. The goal of this research is to develop an automatic treatment planning tool for HDR brachytherapy with a cylinder applicator for vaginal cancer. Methods: After inserting the cylinder applicator into the patient, a CT scan was acquired and was loaded to an in-house developed treatment planning software. The cylinder applicator was automatically segmented using image-processing techniques. CTV was generated based on user-specifiedmore » treatment depth and length. Locations of relevant points (apex point, prescription point, and vaginal surface point), central applicator channel coordinates, and dwell positions were determined according to their geometric relations with the applicator. Dwell time was computed through an inverse optimization process. The planning information was written into DICOM-RT plan and structure files to transfer the automatically generated plan to a commercial treatment planning system for plan verification and delivery. Results: We have tested the system retrospectively in nine patients treated with vaginal cylinder applicator. These cases were selected with different treatment prescriptions, lengths, depths, and cylinder diameters to represent a large patient population. Our system was able to generate treatment plans for these cases with clinically acceptable quality. Computation time varied from 3–6 min. Conclusion: We have developed a system to perform automated treatment planning for HDR brachytherapy with a cylinder applicator. Such a novel system has greatly improved treatment planning efficiency and reduced plan quality variation. It also served as a testbed to demonstrate the feasibility of automatic HDR treatment planning for more complicated cases.« less
Utilization of a multimedia PACS workstation for surgical planning of epilepsy
NASA Astrophysics Data System (ADS)
Soo Hoo, Kent; Wong, Stephen T.; Hawkins, Randall A.; Knowlton, Robert C.; Laxer, Kenneth D.; Rowley, Howard A.
1997-05-01
Surgical treatment of temporal lobe epilepsy requires the localization of the epileptogenic zone for surgical resection. Currently, clinicians utilize electroencephalography, various neuroimaging modalities, and psychological tests together to determine the location of this zone. We investigate how a multimedia neuroimaging workstation built on top of the UCSF Picture Archiving and Communication System can be used to aid surgical planning of epilepsy and related brain diseases. This usage demonstrates the ability of the workstation to retrieve image and textural data from PACS and other image sources, register multimodality images, visualize and render 3D data sets, analyze images, generate new image and text data from the analysis, and organize all data in a relational database management system.
Dunlop, Anne L; Adams, Esther Kathleen; Hawley, Jonathan; Blake, Sarah C; Joski, Peter
We sought to assess the impact of Georgia's family planning demonstration waiver upon access to and use of contraceptive and preventive health services within Title X and Medicaid. Georgia Title X and Medicaid data for January 2009 through December 2013 (before and after the waiver), restricting Title X data to women targeted by the waiver (18-44 years, incomes from 25% and 50% through 200% of the federal poverty level [FPL]) was assembled by quarter and marginal effects of the changes before and after waiver implementation were derived using multivariate regression models. After implementation, there was a significant increase in the probability of Title X clients in the waiver-targeted age and income ranges who had Medicaid versus no insurance and who exited the encounter with higher effectiveness contraceptive methods, including long-acting reversible contraceptives (LARCs), and with cervical cytology and sexually transmitted infection testing. In the Medicaid data from 2009 to 2013, there was an increase in the mean number of encounters per enrollee (2.19 vs. 2.42) and in LARC users; however, the percentage of all Georgia women living under 200% of the FPL with a family planning encounter in Title X and Medicaid decreased from 19% to 15%. Our findings suggest that implementation of the Georgia family planning demonstration waiver contributed to the increased use of higher effectiveness contraceptive methods, including LARCs, within the Medicaid and Title X programs as well as the increased use of preventive screenings among Title X clients. However, when the full population of low-income Georgia women targeted by the waiver was considered, a greater percentage was not served over the demonstration period. Copyright © 2016 Jacobs Institute of Women's Health. Published by Elsevier Inc. All rights reserved.
Phase 1 Methyl Iodide Deep-Bed Adsorption Tests
DOE Office of Scientific and Technical Information (OSTI.GOV)
Soelberg, Nick; Watson, Tony
2014-08-22
Nuclear fission results in the production of fission products (FPs) and activation products including iodine-129, which could evolve into used fuel reprocessing facility off-gas systems, and could require off-gas control to limit air emissions to levels within acceptable emission limits. Research, demonstrations, and some reprocessing plant experience have indicated that diatomic iodine can be captured with efficiencies high enough to meet regulatory requirements. Research on the capture of organic iodides has also been performed, but to a lesser extent [Jubin 2012b]. Several questions remain open regarding the capture of iodine bound in organic compounds. Deep-bed methyl iodide adsorption testing hasmore » progressed according to a multi-laboratory methyl iodide adsorption test plan. This report summarizes the first phase of methyl iodide adsorption work performed according to this test plan using the deep-bed iodine adsorption test system at the Idaho National Laboratory (INL), performed during Fiscal Year (FY) 2013 and early FY-2014. Testing has been performed to address questions posed in the test plan, and followed the testing outline in the test plan. Tests established detection limits, developed procedures for sample analysis with minimal analytical interferences, and confirmed earlier results that show that the methyl iodide reacts when in contact with the AgZ sorbent, and not significantly in the gas flow upstream of the sorbent. The reaction(s) enable separation of the iodine from the organic moiety, so that the iodine can chemisorb onto the sorbent. The organic moiety can form other compounds, some of which are organic compounds that are detected and can be tentatively identified using GC-FID and GCMS. Test results also show that other gas constituents (NOx and/or H2O) can affect the methyl iodide reactions. With NOx and H2O present in the gas stream, the majority of uncaptured iodine exiting iodine-laden sorbent beds is in the form of I2 or HI, species that are soluble in NaOH scrubbing solution for iodine analysis. But when NOx and H2O are not present, then the majority of the uncaptured iodine exiting iodine-laden sorbent is in the form of methyl iodide. Methyl iodide adsorption efficiencies have been high enough so that initial DFs exceed 1,000 to 10,000. The methyl iodide mass transfer zone depths are estimated at 4-8 inches, possibly deeper than mass transfer zone depths estimated for I2 adsorption on AgZ. Additional deep-bed testing and analyses are recommended to (a) expand the data base for methyl iodide adsorption under various conditions specified in the methyl iodide test plan, and (b) provide more data for evaluating organic iodide reactions and reaction byproducts for different potential adsorption conditions.« less
Concentrating Solar Power Central Receiver Panel Component Fabrication and Testing FINAL REPORT
DOE Office of Scientific and Technical Information (OSTI.GOV)
McDowell, Michael W; Miner, Kris
The objective of this project is to complete a design of an advanced concentrated solar panel and demonstrate the manufacturability of key components. Then confirm the operation of the key components under prototypic solar flux conditions. This work is an important step in reducing the levelized cost of energy (LCOE) from a central receiver solar power plant. The key technical risk to building larger power towers is building the larger receiver systems. Therefore, this proposed technology project includes the design of an advanced molten salt prototypic sub-scale receiver panel that can be utilized into a large receiver system. Then completemore » the fabrication and testing of key components of the receive design that will be used to validate the design. This project shall have a significant impact on solar thermal power plant design. Receiver panels of suitable size for utility scale plants are a key element to a solar power tower plant. Many subtle and complex manufacturing processes are involved in producing a reliable, robust receiver panel. Given the substantial size difference between receiver panels manufactured in the past and those needed for large plant designs, the manufacture and demonstration on prototype receiver panel components with representative features of a full-sized panel will be important to improving the build process for commercial success. Given the thermal flux limitations of the test facility, the panel components cannot be rendered full size. Significance changes occurred in the projects technical strategies from project initiation to the accomplishments described herein. The initial strategy was to define cost improvements for the receiver, design and build a scale prototype receiver and test, on sun, with a molten salt heat transport system. DOE had committed to constructing a molten salt heat transport loop to support receiver testing at the top of the NSTTF tower. Because of funding constraints this did not happen. A subsequent plan to test scale prototype receiver, off sun but at temperature, at a molten salt loop at ground level adjacent to the tower also had to be abandoned. Thus, no test facility existed for a molten salt receiver test. As a result, PWR completed the prototype receiver design and then fabricated key components for testing instead of fabricating the complete prototype receiver. A number of innovative design ideas have been developed. Key features of the receiver panel have been identified. This evaluation includes input from Solar 2, personal experience of people working on these programs and meetings with Sandia. Key components of the receiver design and key processes used to fabricate a receiver have been selected for further evaluation. The Test Plan, Concentrated Solar Power Receiver In Cooperation with the Department of Energy and Sandia National Laboratory was written to define the scope of the testing to be completed as well as to provide details related to the hardware, instrumentation, and data acquisition. The document contains a list of test objectives, a test matrix, and an associated test box showing the operating points to be tested. Test Objectives: 1. Demonstrate low-cost manufacturability 2. Demonstrate robustness of two different tube base materials 3. Collect temperature data during on sun operation 4. Demonstrate long term repeated daily operation of heat shields 5. Complete pinhole tube weld repairs 6. Anchor thermal models This report discusses the tests performed, the results, and implications for design improvements and LCOE reduction.« less
Demonstration of Advanced CO 2 Capture Process Improvements for Coal-Fired Flue Gas
DOE Office of Scientific and Technical Information (OSTI.GOV)
Carroll, John
This document summarizes the activities of Cooperative Agreement DE-FE0026590, “Demonstration of Advanced CO 2 Capture Process Improvements for Coal-Fired Flue Gas” during the performance period of October 1, 2015 through May 31, 2017. This project was funded by the U.S. Department of Energy (DOE) National Energy Technology Laboratory (NETL). Southern Company Services, Inc. (SCS) was the prime contractor and co-funder of the project. Mitsubishi Heavy Industries America (MHIA) and AECOM were project team members. The overall project objective was to improve costs, energy requirements, and performance of an existing amine-based CO 2 capture process. This will occur via improvements inmore » three areas: 1. Reboiler design – The first objective of the program was to demonstrate performance of an integrated stripper/reboiler (termed Built-in Reboiler, or BIR) to reduce footprint, capital costs, and integration issues of the current technology. 2. Particulate management – The second objective was to carry out a Particulate Matter Management (PMM) test. This has the potential to reduce operating costs and capital costs due to the reduced or eliminated need for mechanical filtration. 3. Solvent – The third objective was to carry out a new solvent test plan (referred to as NSL) to demonstrate a new solvent (termed New Solvent A), which is expected to reduce regeneration steam. The bulk price is also expected to be lower than KS-1, which is the current solvent used in this process. NSL testing would include baseline testing, optimization, long term testing, solvent reclamation testing, and final inspection. These combine to form the Advanced Carbon Capture (ACC) technology. Much of this work will be applicable to generic solvent processes, especially in regards to improved reboiler design, and focused to meet or exceed the DOE’s overall carbon capture performance goals of 90% CO 2 capture rate with 95% CO 2 purity at a cost of $40/tonne of CO 2 by 2025 and at a cost of electricity (COE) 30% less than baseline CO 2 capture approaches by 2030. This project was divided into two phases. Phase 1 is the planning phase, and Phase 2 is the construction, operations, testing, and analysis phase. A down select occurred after Phase 1. Phase 1 activities were carried out during this reporting period, and therefore, Phase 1 activities are solely considered in this report. The project was not selected for Phase 2 funding.« less
Control of Fan Blade Vibrations Using Piezoelectrics and Bi-Directional Telemetry
NASA Technical Reports Server (NTRS)
Provenza, Andrew J.; Morrison, Carlos R.
2011-01-01
A novel wireless device which transfers supply power through induction to rotating operational amplifiers and transmits low voltage AC signals to and from a rotating body by way of radio telemetry has been successfully demonstrated in the NASA Glenn Research Center (GRC) Dynamic Spin Test Facility. In the demonstration described herein, a rotating operational amplifier provides controllable AC power to a piezoelectric patch epoxied to the surface of a rotating Ti plate. The amplitude and phase of the sinusoidal voltage command signal, transmitted wirelessly to the amplifier, was tuned to completely suppress the 3rd bending resonant vibration of the plate. The plate's 3rd bending resonance was excited using rotating magnetic bearing excitation while it spun at slow speed in a vacuum chamber. A second patch on the opposite side of the plate was used as a sensor. This paper discusses the characteristics of this novel device, the details of a spin test, results from a preliminary demonstration, and future plans.
Hypersonic Inflatable Aerodynamic Decelerator (HIAD) Technology Development Overview
NASA Technical Reports Server (NTRS)
Hughes, Stephen J.; Cheatwood, F. McNeil; Calomino, Anthony M.; Wright, Henry S.; Wusk, Mary E.; Hughes, Monica F.
2013-01-01
The successful flight of the Inflatable Reentry Vehicle Experiment (IRVE)-3 has further demonstrated the potential value of Hypersonic Inflatable Aerodynamic Decelerator (HIAD) technology. This technology development effort is funded by NASA's Space Technology Mission Directorate (STMD) Game Changing Development Program (GCDP). This paper provides an overview of a multi-year HIAD technology development effort, detailing the projects completed to date and the additional testing planned for the future.
A patient self-assessment tool for cardiac rehabilitation.
Phelan, C; Finnell, M D; Mottla, K A
1989-01-01
A patient self-assessment tool was designed, tested, and implemented to promote cardiac-specific data collection, based on Gordon's Functional Health Patterns, to maximize patient/family involvement in determining a plan of care, and to streamline primary nurses' documentation requirements. Retrospective and concurrent chart reviews provided data for quality assurance monitoring. The results of the monitoring demonstrated that the self-assessment tool markedly improved the patient-specific data base.
The asteroid impact mission: testing laser communication in deep-space
NASA Astrophysics Data System (ADS)
Carnelli, I.; Mellab, K.; Heese, C.; Sodnik, Z.; Pesquita, V.; Gutierrez, B.
2017-09-01
In October 2022 the binary asteroid system 65803 Didymos will have an exceptionally close approach with the Earth flying by within only 0.088 AU. ESA is planning to leverage on this close encounter to launch a small mission of opportunity called Asteroid Impact Mission (AIM) to explore and demonstrate new technologies for future science and exploration missions while addressing planetary defence and performing asteroid scientific investigations.
Ocean Thermal Energy Conversion (OTEC) program. FY 1977 program summary
DOE Office of Scientific and Technical Information (OSTI.GOV)
None
1978-01-01
An overview is given of the ongoing research, development, and demonstration efforts. Each of the DOE's Ocean Thermal Energy Conversion projects funded during fiscal year 1977 (October 1, 1976 through September 30, 1977) is described and each project's status as of December 31, 1977 is reflected. These projects are grouped as follows: program support, definition planning, engineering development, engineering test and evaluation, and advanced research and technology. (MHR)
ERIC Educational Resources Information Center
Storie, Gary; Denner, Peter R.
2015-01-01
In the fall of 2012, Idaho implemented a plan to award bonus pay to schools whose students demonstrated academic growth based on the Betebenner (2008) method. This study examined the relationship of the amount of bonus paid to a school, the percentage of students from low income families associated with a school, and the location of the school…
Design and Preliminary Testing Plan of Electronegative Ion Thruster
NASA Technical Reports Server (NTRS)
Schloeder, Natalie R.; Liu, Thomas M.; Walker, Mitchell L. R.; Polzin, Kurt A.; Dankanich, John W.; Aanesland, Ane
2014-01-01
Electronegative ion thrusters are a new iteration of existing gridded ion thruster technology differentiated by their ability to produce and accelerate both positive and negative ions. The primary motivations for electronegative ion thruster development include the elimination of lifetime-limiting cathodes from a thruster system and the ability to generate appreciable thrust through the acceleration of both positive or negative-charged ions. Proof-of-concept testing of the PEGASES (Plasma Propulsion with Electronegative GASES) thruster demonstrated the production of positively and negatively-charged ions (argon and sulfur hexafluoride, respectively) in an RF discharge and the subsequent acceleration of each charge species through the application of a time-varying electric field to a pair of metallic grids similar to those found in gridded ion thrusters. Leveraging the knowledge gained through experiments with the PEGASES I and II prototypes, the MINT (Marshall's Ion-ioN Thruster) is being developed to provide a platform for additional electronegative thruster proof-of-concept validation testing including direct thrust measurements. The design criteria used in designing the MINT are outlined and the planned tests that will be used to characterize the performance of the prototype are described.
NASA Technical Reports Server (NTRS)
Sauerwein, Timothy A.; Gostomski, Thomas
2007-01-01
The ST5 payload, part of NASA s New Millennium Program headquartered at JPL, consisted of three micro satellites (approx. 30 kg each) deployed into orbit from the Pegasus XL launch. ST5 was a technology demonstration mission, intended to test new technologies for potential use for future missions. In order to meet the launch date schedule of ST 5, a different approach was required rather than the standard I&T approach used for single, room-sized satellites. The I&T phase was planned for spacecraft #1 to undergo integration and test first, followed by spacecraft #2 and #3 in tandem. A team of engineers and technicians planned and executed the integration of all three spacecraft emphasizing versatility and commonality. They increased their knowledge and efficiency through spacecraft #1 integration and testing and utilized their experience and knowledge to safely execute I&T for spacecraft #2 and #3. Each integration team member could perform many different roles and functions and thus better support activities on any of the three spacecraft. The I&T campaign was completed with STS s successful launch on March 22,2006
Flight test of ARINC 741 configuration low gain SATCOM system on Boeing 747-400 aircraft
NASA Technical Reports Server (NTRS)
Murphy, Timothy A.; Stapleton, Brian P.
1990-01-01
The Boeing company conducted a flight test of a SATCOM system similar to the ARINC 741 configuration on a production model 747-400. A flight plan was specifically designed to test the system over a wide variety of satellite elevations and aircraft attitudes as well as over land and sea. Interface bit errors, signal quality and aircraft position and navigational inputs were all recorded as a function of time. Special aircraft maneuvers were performed to demonstrate the potential for shadowing by aircraft structures. Both a compass rose test and the flight test indicated that shadowing from the tail is insignificant for the 747-400. However, satellite elevation angles below the aircraft horizon during banking maneuvers were shown to have a significant deleterious effect on SATCOM communications.
Flight test of ARINC 741 configuration low gain SATCOM system on Boeing 747-400 aircraft
NASA Astrophysics Data System (ADS)
Murphy, Timothy A.; Stapleton, Brian P.
The Boeing company conducted a flight test of a SATCOM system similar to the ARINC 741 configuration on a production model 747-400. A flight plan was specifically designed to test the system over a wide variety of satellite elevations and aircraft attitudes as well as over land and sea. Interface bit errors, signal quality and aircraft position and navigational inputs were all recorded as a function of time. Special aircraft maneuvers were performed to demonstrate the potential for shadowing by aircraft structures. Both a compass rose test and the flight test indicated that shadowing from the tail is insignificant for the 747-400. However, satellite elevation angles below the aircraft horizon during banking maneuvers were shown to have a significant deleterious effect on SATCOM communications.
Tool use in neurodegenerative diseases: Planning or technical reasoning?
Baumard, Josselin; Lesourd, Mathieu; Remigereau, Chrystelle; Jarry, Christophe; Etcharry-Bouyx, Frédérique; Chauviré, Valérie; Osiurak, François; Le Gall, Didier
2017-04-29
Recent works showed that tool use can be impaired in stroke patients because of either planning or technical reasoning deficits, but these two hypotheses have not yet been compared in the field of neurodegenerative diseases. The aim of this study was to address the relationships between real tool use, mechanical problem-solving, and planning skills in patients with Alzheimer's disease (AD, n = 32), semantic dementia (SD, n = 16), and corticobasal syndrome (CBS, n = 9). Patients were asked to select and use ten common tools, to solve three mechanical problems, and to complete the Tower of London test. Motor function and episodic memory were controlled using the Purdue Pegboard Test and the BEC96 questionnaire, respectively. A data-transformation method was applied to avoid ceiling effects, and single-case analysis was performed based on raw scores and completion time. All groups demonstrated either impaired or slowed tool use. Planning deficits were found only in the AD group. Mechanical problem-solving deficits were observed only in the AD and CBS groups. Performance in the Tower of London test was the best predictor of tool use skills in the AD group, suggesting these patients had general rather than mechanical problem-solving deficits. Episodic memory seemed to play little role in performance. Motor dysfunction tended to be associated with tool use skills in CBS patients, while tool use disorders are interpreted as a consequence of the semantic loss in SD in line with previous works. These findings may encourage caregivers to set up disease-centred interventions. © 2017 The British Psychological Society.
Open-source software for collision detection in external beam radiation therapy
NASA Astrophysics Data System (ADS)
Suriyakumar, Vinith M.; Xu, Renee; Pinter, Csaba; Fichtinger, Gabor
2017-03-01
PURPOSE: Collision detection for external beam radiation therapy (RT) is important for eliminating the need for dryruns that aim to ensure patient safety. Commercial treatment planning systems (TPS) offer this feature but they are expensive and proprietary. Cobalt-60 RT machines are a viable solution to RT practice in low-budget scenarios. However, such clinics are hesitant to invest in these machines due to a lack of affordable treatment planning software. We propose the creation of an open-source room's eye view visualization module with automated collision detection as part of the development of an open-source TPS. METHODS: An openly accessible linac 3D geometry model is sliced into the different components of the treatment machine. The model's movements are based on the International Electrotechnical Commission standard. Automated collision detection is implemented between the treatment machine's components. RESULTS: The room's eye view module was built in C++ as part of SlicerRT, an RT research toolkit built on 3D Slicer. The module was tested using head and neck and prostate RT plans. These tests verified that the module accurately modeled the movements of the treatment machine and radiation beam. Automated collision detection was verified using tests where geometric parameters of the machine's components were changed, demonstrating accurate collision detection. CONCLUSION: Room's eye view visualization and automated collision detection are essential in a Cobalt-60 treatment planning system. Development of these features will advance the creation of an open-source TPS that will potentially help increase the feasibility of adopting Cobalt-60 RT.
Park, Peter Y; Young, Jason
2012-03-01
An important potential benefit of a jurisdiction developing an upper-level traffic safety policy statement, such as a strategic highway safety plan (SHSP) or a traffic safety action plan, is the creation of a manageable number of focus areas, known as emphasis areas. The responsible agencies in the jurisdiction can then direct their finite resources in a systematic and strategic way designed to maximize the effort to reduce the number and severity of roadway collisions. In the United States, the federal government through AASHTO has suggested 22 potential emphasis areas. In Canada, CCMTA's 10 potential emphasis areas have been listed for consideration. This study reviewed the SHSP and traffic safety action plan of 53 jurisdictions in North America, and conducted descriptive data analyses to clarify the issues that currently affect the selection and prioritization process of jurisdiction-specific emphasis areas. We found that the current process relies heavily on high-level collision data analysis and communication among the SHSP stakeholders, but may not be the most efficient and effective way of selecting and prioritizing the emphasis areas and allocating safety improvement resources. This study then formulated a formal collision diagnosis test, known as the beta-binomial test, to clarify and illuminate the selection and the prioritization of jurisdiction-specific emphasis areas. We developed numerical examples to demonstrate how engineers can apply the proposed diagnosis test to improve the selection and prioritization of individual jurisdictions' emphasis areas. Copyright © 2011 Elsevier Ltd. All rights reserved.
NASA's In-Situ Resource Utilization Project: Current Accomplishments and Exciting Future Plans
NASA Technical Reports Server (NTRS)
Larson, William E.; Sanders, Gerald B.; Sacksteder, Kurt R.
2010-01-01
The utilization of Space resources has been identified in publications for over 40 years for its potential as a "game changing" technology for the human exploration of Space. It is called "game changing" because of the mass leverage possible when local resources at the exploration destination arc used to reduce or even eliminate resources that are brought from the Earth. NASA, under the Exploration Technology Development Program has made significant investments in the development of Space resource utilization technologies as a part of the In-Situ Resource Utilization (ISRU) project. Over the last four years, the ISRU project has taken what was essentially an academic topic with lots of experimentation but little engineering and produced near-full-scale systems that have been demonstrated. In 2008 & again in early 2010, systems that could produce oxygen from lunar soils (or their terrestrial analogs) were tested at a lunar analog site on a volcano in Hawaii. These demonstrations included collaborations with International Partners that made significant contributions to the tests. The proposed federal budget for Fiscal Year 2011 encourages the continued development and demonstration of ISRU. However it goes beyond what the project is currently doing and directs that the scope of the project be expanded to cover destinations throughout the inner solar system with the potential for night demonstrations. This paper will briefly cover the past accomplishments of the ISRU project then move to a di scussion of the plans for the project's future as NASA moves to explore a new paradigm for Space Exploration that includes orbital fuel depots and even refueling on other planetary bodies in the solar system.
Hospital capacity and management preparedness for pandemic influenza in Victoria.
Dewar, Ben; Barr, Ian; Robinson, Priscilla
2014-04-01
This study was designed to investigate acute hospital pandemic influenza preparedness in Victoria, Australia, particularly focussing on planning and management efforts. A prospective study was conducted by questionnaire and semi-structured interview of health managers across the Victorian hospital system from July to October 2011. Participants with responsibility for emergency management, planning and operations were selected from every hospital in Victoria with an emergency department to complete a questionnaire (response rate 22/43 = 51%). Each respondent was invited to participate in a phone-based semi-structured interview (response rate 11/22 = 50%). Rural/regional hospitals demonstrated higher levels of clinical (86%) and non-clinical (86%) staff contingency planning than metropolitan hospitals (60% and 40% respectively). Pandemic plans were not being sufficiently tested in exercises or drills, which is likely to undermine their effectiveness. All respondents reported hand hygiene and standard precautions programs in place, although only one-third (33%) of metropolitan respondents and no rural/regional respondents reported being able to meet patient needs with high levels of staff absenteeism. Almost half Victoria's healthcare workers were unvaccinated against influenza. Hospitals across Victoria demonstrated different levels of influenza pandemic preparedness and planning. If a more severe influenza pandemic than that of 2009 arose, Victorian hospitals would struggle with workforce and infrastructure problems, particularly in rural/regional areas. Staff absenteeism threatens to undermine hospital pandemic responses. Various strategies, including education and communication, should be included with in-service training to provide staff with confidence in their ability to work safely during a future pandemic. © 2014 The Authors. ANZJPH © 2014 Public Health Association of Australia.
49 CFR 232.505 - Pre-revenue service acceptance testing plan.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 49 Transportation 4 2010-10-01 2010-10-01 false Pre-revenue service acceptance testing plan. 232... § 232.505 Pre-revenue service acceptance testing plan. (a) General; submission of plan. Except as... its system the operating railroad or railroads shall submit a pre-revenue service acceptance testing...
Flight Test Results from the Rake Airflow Gage Experiment on the F-15B Airplane
NASA Technical Reports Server (NTRS)
Frederick, Michael A.; Ratnayake, Nalin A.
2010-01-01
The Rake Airflow Gage Experiment involves a flow-field survey rake that was flown on the Propulsion Flight Test Fixture at the NASA Dryden Flight Research Center using the Dryden F-15B research test bed airplane. The objective of this flight test was to ascertain the flow-field angularity, local Mach number profile, total pressure distortion, and dynamic pressure at the aerodynamic interface plane of the Channeled Centerbody Inlet Experiment. This new mixed-compression, supersonic inlet is planned for flight test in the near term. Knowledge of the flow-field characteristics at this location underneath the airplane is essential to flight test planning and computational modeling of the new inlet, and it is also applicable for future propulsion systems research that may use the Propulsion Flight Test Fixture. This report describes the flight test preparation and execution, and the local flowfield properties calculated from pressure measurements of the rake. Data from the two Rake Airflow Gage Experiment research flights demonstrate that the F-15B airplane, flying at a free-stream Mach number of 1.65 and a pressure altitude of 40,000 ft, would achieve the desired local Mach number for the future inlet flight test. Interface plane distortion levels of 2 percent and a local angle of attack of 2 were observed at this condition. Alternative flight conditions for future testing and an exploration of certain anomalous data also are provided.
Flight Test Results from the Rake Airflow Gage Experiment on the F-15B Airplane
NASA Technical Reports Server (NTRS)
Frederick, Michael A.; Ratnayake, Nalin A.
2011-01-01
The Rake Airflow Gage Experiment involves a flow-field survey rake that was flown on the Propulsion Flight Test Fixture at the NASA Dryden Flight Research Center using the Dryden F-15B research test bed airplane. The objective of this flight test was to ascertain the flow-field angularity, local Mach number profile, total pressure distortion, and dynamic pressure at the aerodynamic interface plane of the Channeled Centerbody Inlet Experiment. This new mixed-compression, supersonic inlet is planned for flight test in the near term. Knowledge of the flow-field characteristics at this location underneath the airplane is essential to flight test planning and computational modeling of the new inlet, an< it is also applicable for future propulsion systems research that may use the Propulsion Flight Test Fixture. This report describes the flight test preparation and execution, and the local flow-field properties calculated from pressure measurements of the rake. Data from the two Rake Airflow Gage Experiment research flights demonstrate that the F-15B airplane, flying at a free-stream Mach number of 1.65 and a pressure altitude of 40,000 ft, would achieve the desired local Mach number for the future inlet flight test. Interface plane distortion levels of 2 percent and a local angle of attack of -2 deg were observed at this condition. Alternative flight conditions for future testing and an exploration of certain anomalous data also are provided.
2016-01-20
Engineers for NASA's MarCO (Mars Cube One) technology demonstration inspect the MarCO test bed, which contains components that are identical to those built for a flight to Mars. Cody Colley, left, MarCO integration and test deputy, and Shannon Statham, MarCO integration and test lead, are on the team at NASA's Jet Propulsion Laboratory, Pasadena, California, preparing twin MarCO CubeSats. The briefcase-size MarCO twins were designed to ride along with NASA's next Mars lander, InSight. Its planned March 2016 launch was suspended. InSight -- an acronym for Interior Exploration using Seismic Investigations, Geodesy and Heat Transport -- will study the interior of Mars to improve understanding of the processes that formed and shaped rocky planets, including Earth. Note: After thorough examination, NASA managers have decided to suspend the planned March 2016 launch of the Interior Exploration using Seismic Investigations Geodesy and Heat Transport (InSight) mission. The decision follows unsuccessful attempts to repair a leak in a section of the prime instrument in the science payload. http://photojournal.jpl.nasa.gov/catalog/PIA20341
A worker attaches covers for the nose pitot boom before removing the unpiloted X-40 from the runway
NASA Technical Reports Server (NTRS)
2001-01-01
A worker attaches covers for the nose pitot boom before removing the unpiloted X-40 from the runway at Edwards Air Force Base, California, following its successful free-flight on March 14, 2001. The unpiloted X-40 is a risk-reduction vehicle for the X-37, which is intended to be a reusable space vehicle. NASA's Marshall Space Flight Center in Huntsville, Ala, manages the X-37 project. At Dryden, the X-40A underwent a series of ground and air tests to reduce possible risks to the larger X-37, including drop tests from a helicopter to check guidance and navigation systems planned for use in the X-37. The X-37 is designed to demonstrate technologies in the orbital and reentry environments for next-generation reusable launch vehicles that will increase both safety and reliability, while reducing launch costs from $10,000 per pound to $1,000 per pound. The X-37, carried into orbit by the Space Shuttle, is planned to fly two orbital missions to test reusable launch vehicle technologies.
FIELD IMPLEMENTATION PLAN FOR A WILLISTON BASIN BRINE EXTRACTION AND STORAGE TEST
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hamling, John; Klapperich, Ryan; Stepan, Daniel
2016-03-31
The Energy & Environmental Research Center (EERC) successfully completed all technical work of Phase I, including development of a field implementation plan (FIP) for a brine extraction and storage test (BEST) in the North Dakota portion of the Williston Basin. This implementation plan was commissioned by the U.S. Department of Energy (DOE) National Energy Technology Laboratory (NETL) as a proxy for managing formation pressure plumes and measuring/monitoring the movement of differential pressure and CO2 plumes in the subsurface for future saline CO2 storage projects. BEST comprises the demonstration and validation of active reservoir management (ARM) strategies and extracted brine treatmentmore » technologies. Two prospective commercial brine injection sites were evaluated for BEST to satisfy DOE’s goals. Ultimately, an active saltwater disposal (SWD) site, Johnsons Corner, was selected because it possesses an ideal combination of key factors making it uniquely suited to host BEST. This site is located in western North Dakota and operated by Nuverra Environmental Solutions (Nuverra), a national leader in brine handling, treatment, and injection. An integrated management approach was used to incorporate local and regional geologic characterization activities with geologic and simulation models, inform a monitoring, verification, and accounting (MVA) plan, and to conduct a risk assessment. This approach was used to design a FIP for an ARM schema and an extracted brine treatment technology test bed facility. The FIP leverages an existing pressure plume generated by two commercial SWD wells. These wells, in conjunction with a new brine extraction well, will be used to conduct the ARM schema. Results of these tests will be quantified based on their impact on the performance of the existing SWD wells and the surrounding reservoir system. Extracted brine will be injected into an underlying deep saline formation through a new injection well. The locations of proposed extraction and injection wells were selected during the Phase I efforts. These wells will be permitted as North Dakota Administrative Code Underground Injection Control Class II wells and will yield additional characterization data which will further refine the FIP in Phase II. An array of surface and downhole monitoring techniques will validate ARM performance against predictive simulation results. Infrastructure will be constructed to manage extracted fluids at the surface and provide brine to a treatment test bed facility. Treatment of extracted brine can provide a means of reducing extracted brine disposal volumes, an alternate source of water, and/or salable products for beneficial use. A test bed facility will be constructed to provide a means of demonstrating these technologies on a wide range of brine concentrations. Screening criteria based on a techno-economic and life cycle assessment were developed to select high-salinity brine treatment technologies for extended duration treatment (30–60 days) in Phase II. A detailed cost assessment determined total implementation costs for BEST of $19,901,065 million (DOE share $15,680,505). These costs are inclusive of all necessary equipment, infrastructure construction, operations and project closeout costs required to implement BEST. An ideal combination of key factors makes the Johnsons Corner site uniquely suited to be the BEST demonstration.« less
Single Event Effect (SEE) Test Planning 101
NASA Technical Reports Server (NTRS)
LaBel, Kenneth A.; Pellish, Jonathan; Berg, Melanie D.
2011-01-01
This is a course on SEE Test Plan development. It is an introductory discussion of the items that go into planning an SEE test that should complement the SEE test methodology used. Material will only cover heavy ion SEE testing and not proton, LASER, or other though many of the discussed items may be applicable. While standards and guidelines for how-to perform single event effects (SEE) testing have existed almost since the first cyclotron testing, guidance on the development of SEE test plans has not been as easy to find. In this section of the short course, we attempt to rectify this lack. We consider the approach outlined here as a "living" document: mission specific constraints and new technology related issues always need to be taken into account. We note that we will use the term "test planning" in the context of those items being included in a test plan.
Schiff, Gordon D; Reyes Nieva, Harry; Griswold, Paula; Leydon, Nicholas; Ling, Judy; Federico, Frank; Keohane, Carol; Ellis, Bonnie R; Foskett, Cathy; Orav, E John; Yoon, Catherine; Goldmann, Don; Weissman, Joel S; Bates, David W; Biondolillo, Madeleine; Singer, Sara J
2017-08-01
Evaluate application of quality improvement approaches to key ambulatory malpractice risk and safety areas. In total, 25 small-to-medium-sized primary care practices (16 intervention; 9 control) in Massachusetts. Controlled trial of a 15-month intervention including exposure to a learning network, webinars, face-to-face meetings, and coaching by improvement advisors targeting "3+1" high-risk domains: test result, referral, and medication management plus culture/communication issues evaluated by survey and chart review tools. Chart reviews conducted at baseline and postintervention for intervention sites. Staff and patient survey data collected at baseline and postintervention for intervention and control sites. Chart reviews demonstrated significant improvements in documentation of abnormal results, patient notification, documentation of an action or treatment plan, and evidence of a completed plan (all P<0.001). Mean days between laboratory test date and evidence of completed action/treatment plan decreased by 19.4 days (P<0.001). Staff surveys showed modest but nonsignificant improvement for intervention practices relative to controls overall and for the 3 high-risk domains that were the focus of PROMISES. A consortium of stakeholders, quality improvement tools, coaches, and learning network decreased selected ambulatory safety risks often seen in malpractice claims.
An assigned responsibility system for robotic teleoperation control.
Small, Nicolas; Lee, Kevin; Mann, Graham
2018-01-01
This paper proposes an architecture that explores a gap in the spectrum of existing strategies for robot control mode switching in adjustable autonomy. In situations where the environment is reasonably known and/or predictable, pre-planning these control changes could relieve robot operators of the additional task of deciding when and how to switch. Such a strategy provides a clear division of labour between the automation and the human operator(s) before the job even begins, allowing for individual responsibilities to be known ahead of time, limiting confusion and allowing rest breaks to be planned. Assigned Responsibility is a new form of adjustable autonomy-based teleoperation that allows the selective inclusion of automated control elements at key stages of a robot operation plan's execution. Progression through these stages is controlled by automatic goal accomplishment tracking. An implementation is evaluated through engineering tests and a usability study, demonstrating the viability of this approach and offering insight into its potential applications.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Eperin, A.P.; Zakharzhevsky, Yu.O.; Arzhaev, A.I.
A two-year Finnish-Russian cooperation program has been initiated in 1995 to demonstrate the applicability of the leak-before-break concept (LBB) to the primary circuit piping of the Leningrad NPP. The program includes J-R curve testing of authentic pipe materials at full operating temperature, screening and computational LBB analyses complying with the USNRC Standard Review Plan 3.6.3, and exchange of LBB-related information with emphasis on NDE. Domestic computer codes are mainly used, and all tests and analyses are independently carried out by each party. The results are believed to apply generally to RBMK type plants of the first generation.
High specific energy, high capacity nickel-hydrogen cell design
NASA Technical Reports Server (NTRS)
Wheeler, James R.
1993-01-01
A 3.5 inch rabbit-ear-terminal nickel-hydrogen cell has been designed and tested to deliver high capacity at a C/1.5 discharge rate. Its specific energy yield of 60.6 wh/kg is believed to be the highest yet achieved in a slurry-process nickel-hydrogen cell, and its 10 C capacity of 113.9 AH the highest capacity yet made at a discharge rate this high in the 3.5 inch diameter size. The cell also demonstrated a pulse capability of 180 amps for 20 seconds. Specific cell parameters, performance, and future test plans are described.
SERT D spacecraft study. [project planning and objectives
NASA Technical Reports Server (NTRS)
1974-01-01
The SERT D (Space Electric Rocket Test - D) study defines a possible spacecraft project that would demonstrate the use of electric ion thrusters for long-term (5 yr) station keeping and attitude control of a synchronous orbit satellite. Other mission objectives included in the study were: station walking to satellite rendezvous and inspection, use of low cost attitude sensing system, use of an advanced solar array orientation and slip ring system, and an ion thruster integrated directly with a solar array power source. The SERT D spacecraft, if launched, will become SERT 3 the third space electric thruster test.
Field investigation of the drift shadow
Su, G.W.; Kneafsey, T.J.; Ghezzehei, T.A.; Cook, P.J.; Marshall, B.D.
2006-01-01
The "Drift Shadow" is defined as the relatively drier region that forms below subsurface cavities or drifts in unsaturated rock. Its existence has been predicted through analytical and numerical models of unsaturated flow. However, these theoretical predictions have not been demonstrated empirically to date. In this project we plan to test the drift shadow concept through field investigations and compare our observations to simulations. Based on modeling studies we have an identified a suitable site to perform the study at an inactive mine in a sandstone formation. Pretest modeling studies and preliminary characterization of the site are being used to develop the field scale tests.
Effect of electromagnetic field emitted by cellular phones on fetal heart rate patterns.
Celik, Onder; Hascalik, Seyma
2004-01-15
The study was planned to determine the effects of electromagnetic fields produced by cellular phones on baseline fetal heart rate, acceleration and deceleration. Forty pregnant women undergoing non-stress test were admitted to the study. Non-stress test was obtained while the subjects were holding the CP on stand by mode and on dialing mode, each for 5 min. Similar recordings were taken while there were no phones around for 10 min. Electromagnetic fields produced by cellular phones do not cause any demonstrable affect in fetal heart rate, acceleration and deceleration.
An improved waste collection system for space flight
NASA Technical Reports Server (NTRS)
Thornton, William E.; Lofland, William W., Jr.; Whitmore, Henry
1986-01-01
Waste collection systems are a critical part of manned space flight. Systems to date have had a number of deficiencies. A new system, which uses a simple mechanical piston compactor and disposable pads allows a clean area for defecation and maximum efficiency of waste collection and storage. The concept has been extensively tested. Flight demonstration units are being built, tested, and scheduled for flight. A prototype operational unit is under construction. This system offers several advantages over existing or planned systems in the areas of crew interface and operation, cost, size, weight, and maintenance and power consumption.
DOE Office of Scientific and Technical Information (OSTI.GOV)
DUNCAN JB; HUBER HJ
2011-06-08
This report documents the preparation of three actual Hanford tank waste samples for shipment to the Savannah River National Laboratory (SRNL). Two of the samples were dissolved saltcakes from tank 241-AN-103 (hereafter AN-103) and tank 241-SX-105 (hereafter SX-105); one sample was a supernate composite from tanks 241-AZ-101 and 241-AZ-102 (hereafter AZ-101/102). The preparation of the samples was executed following the test plans LAB-PLAN-10-00006, Test Plan for the Preparation of Samples from Hanford Tanks 241-SX-105, 241-AN-103, 241-AN-107, and LAB-PLN-10-00014, Test Plan for the Preparation of a Composite Sample from Hanford Tanks 241-AZ-101 and 241-AZ-102 for Steam Reformer Testing at the Savannahmore » River National Laboratory. All procedural steps were recorded in laboratory notebook HNF-N-274 3. Sample breakdown diagrams for AN-103 and SX-105 are presented in Appendix A. The tank samples were prepared in support of a series of treatability studies of the Fluidized Bed Steam Reforming (FBSR) process using a Bench-Scale Reformer (BSR) at SRNL. Tests with simulants have shown that the FBSR mineralized waste form is comparable to low-activity waste glass with respect to environmental durability (WSRC-STI-2008-00268, Mineralization of Radioactive Wastes by Fluidized Bed Steam Reforming (FBSR): Comparisons to Vitreous Waste Forms and Pertinent Durability Testing). However, a rigorous assessment requires long-term performance data from FB SR product formed from actual Hanford tank waste. Washington River Protection Solutions, LLC (WRPS) has initiated a Waste Form Qualification Program (WP-S.2.1-20 1 0-00 1, Fluidized Bed Steam Reformer Low-level Waste Form Qualification) to gather the data required to demonstrate that an adequate FBSR mineralized waste form can be produced. The documentation of the selection process of the three tank samples has been separately reported in RPP-48824, 'Sample Selection Process for Bench-Scale Steam Reforming Treatability Studies Using Hanford Waste Samples.'« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
DUNCAN JB; HUBER HJ
2011-04-21
This report documents the preparation of three actual Hanford tank waste samples for shipment to the Savannah River National Laboratory (SRNL). Two of the samples were dissolved saltcakes from tank 241-AN-103 (hereafter AN-103) and tank 241-SX-105 (hereafter SX-105); one sample was a supernate composite from tanks 241-AZ-101 and 241-AZ-102 (hereafter AZ-101/102). The preparation of the samples was executed following the test plans LAB-PLAN-10-00006, Test Plan for the Preparation of Samples from Hanford Tanks 241-SX-105, 241-AN-103, 241-AN-107, and LAB-PLN-l0-00014, Test Plan for the Preparation of a Composite Sample from Hanford Tanks 241-AZ-101 and 241-AZ-102 for Steam Reformer Testing at the Savannahmore » River National Laboratory. All procedural steps were recorded in laboratory notebook HNF-N-274 3. Sample breakdown diagrams for AN-103 and SX-105 are presented in Appendix A. The tank samples were prepared in support of a series of treatability studies of the Fluidized Bed Steam Reforming (FBSR) process using a Bench-Scale Reformer (BSR) at SRNL. Tests with simulants have shown that the FBSR mineralized waste form is comparable to low-activity waste glass with respect to environmental durability (WSRC-STI-2008-00268, Mineralization of Radioactive Wastes by Fluidized Bed Steam Reforming (FBSR): Comparisons to Vitreous Waste Forms and Pertinent Durability Testing). However, a rigorous assessment requires long-term performance data from FBSR product formed from actual Hanford tank waste. Washington River Protection Solutions, LLC (WRPS) has initiated a Waste Form Qualification Program (WP-5.2.1-2010-001, Fluidized Bed Steam Reformer Low-level Waste Form Qualification) to gather the data required to demonstrate that an adequate FBSR mineralized waste form can be produced. The documentation of the selection process of the three tank samples has been separately reported in RPP-48824, Sample Selection Process for Bench-Scale Steam Reforming Treatability Studies Using Hanford Waste Samples.« less
How Will Section 1115 Medicaid Expansion Demonstrations Inform Federal Policy?
Rosenbaum, Sara; Schmucker, Sara; Rothenberg, Sara; Gunsalus, Rachel
2016-05-01
Section 1115 of the Social Security Act allows the U.S. Department of Health and Human Services and states to test innovations in Medicaid and other public welfare programs without formal legislative action. Six states currently operate their Medicaid expansions as demonstrations and several more are expected to seek permission to do so. While the current Medicaid expansion demonstrations vary, they share a major focus: increasing beneficiaries' financial responsibility for the cost of coverage and care. Demonstrations include requirements that Medicaid beneficiaries pay enrollment fees and cost-sharing that exceed traditional Medicaid limits. Others propose tying beneficiaries' financial responsibility to behavioral changes in health and wellness, while still others impose penalties for nonpayment of enrollment fees. Evaluations must consider the impact of these requirements on access, use of care, and health status, as well as the feasibility of demonstration reforms and their impact on administrative efficiency, providers, and health plans.
Williams-Jones, Bryn; Burgess, Michael M
2004-06-01
Decisions about funding health services are crucial to controlling costs in health care insurance plans, yet they encounter serious challenges from intellectual property protection--e.g., patents--of health care services. Using Myriad Genetics' commercial genetic susceptibility test for hereditary breast cancer (BRCA testing) in the context of the Canadian health insurance system as a case study, this paper applies concepts from social contract theory to help develop more just and rational approaches to health care decision making. Specifically, Daniel's and Sabin's "accountability for reasonableness" is compared to broader notions of public consultation, demonstrating that expert assessments in specific decisions must be transparent and accountable and supplemented by public consultation.
The NASA pollution-reduction technology program for small jet aircraft engines
NASA Technical Reports Server (NTRS)
Fear, J. S.
1976-01-01
Three advanced combustor concepts, designed for the AiResearch TFE 731-2 turbofan engine, were evaluated in screening tests. Goals for carbon monoxide and unburned hydrocarbons were met or closely approached with two of the concepts with relatively modest departures from conventional combustor design practices. A more advanced premixing/prevaporizing combustor, while appearing to have the potential for meeting the oxides of nitrogen goal as well, will require extensive development to make it a practical combustion system. Smoke numbers for the two combustor concepts were well within the EPA smoke standard. Phase 2, Combustor-Engine Compatibility Testing, which is in its early stages, and planned Phase 3, Combustor-Engine Demonstration Testing, are also described.
77 FR 38399 - Approval and Promulgation of Implementation Plans; Arizona; Nogales PM10
Federal Register 2010, 2011, 2012, 2013, 2014
2012-06-27
...EPA is proposing to approve a state implementation plan revision submitted by the Arizona Department of Environmental Quality to address the moderate area PM10, particulate matter with an aerodynamic diameter of less than or equal to a nominal ten micrometers, planning requirements for the Nogales nonattainment area. Consistent with this proposal, EPA is also proposing to approve the following plan elements as meeting the requirements of the Clean Air Act: the Nogales nonattainment area 2008 and 2011 emission inventories; the demonstration that the Nogales nonattainment area is attaining the National Ambient Air Quality Standard for PM10, but for international emissions sources in Nogales, Mexico; the demonstration that reasonably available control measures sufficient to meet the standard have been implemented in the nonattainment area; the reasonable further progress demonstration; the demonstration that implementation of measures beyond those needed for attainment meet the contingency measure requirement; and, the motor vehicle emissions budget for the purposes of determining the conformity of transportation plans, programs, and projects with this PM10 plan.
Flight demonstrator concept for key technologies enabling future reusable launch vehicles
NASA Astrophysics Data System (ADS)
Ishimoto, Shinji; Fujii, Kenji; Mori, Takeshi
2005-07-01
A research center in JAXA has recently started research on reusable launch vehicles according to its plan placing emphasis on advanced launch technology. It is planned to demonstrate key technologies using a rocket-powered winged vehicle, and concept studies on the flight demonstrator have been conducted. This paper describes the present research plan and introduces the most compact vehicle concept among some versions under consideration.
Large Liquid Rocket Testing: Strategies and Challenges
NASA Technical Reports Server (NTRS)
Rahman, Shamim A.; Hebert, Bartt J.
2005-01-01
Rocket propulsion development is enabled by rigorous ground testing in order to mitigate the propulsion systems risks that are inherent in space flight. This is true for virtually all propulsive devices of a space vehicle including liquid and solid rocket propulsion, chemical and non-chemical propulsion, boost stage and in-space propulsion and so forth. In particular, large liquid rocket propulsion development and testing over the past five decades of human and robotic space flight has involved a combination of component-level testing and engine-level testing to first demonstrate that the propulsion devices were designed to meet the specified requirements for the Earth to Orbit launchers that they powered. This was followed by a vigorous test campaign to demonstrate the designed propulsion articles over the required operational envelope, and over robust margins, such that a sufficiently reliable propulsion system is delivered prior to first flight. It is possible that hundreds of tests, and on the order of a hundred thousand test seconds, are needed to achieve a high-reliability, flight-ready, liquid rocket engine system. This paper overviews aspects of earlier and recent experience of liquid rocket propulsion testing at NASA Stennis Space Center, where full scale flight engines and flight stages, as well as a significant amount of development testing has taken place in the past decade. The liquid rocket testing experience discussed includes testing of engine components (gas generators, preburners, thrust chambers, pumps, powerheads), as well as engine systems and complete stages. The number of tests, accumulated test seconds, and years of test stand occupancy needed to meet varying test objectives, will be selectively discussed and compared for the wide variety of ground test work that has been conducted at Stennis for subscale and full scale liquid rocket devices. Since rocket propulsion is a crucial long-lead element of any space system acquisition or development, the appropriate plan and strategy must be put in place at the outset of the development effort. A deferment of this test planning, or inattention to strategy, will compromise the ability of the development program to achieve its systems reliability requirements and/or its development milestones. It is important for the government leadership and support team, as well as the vehicle and propulsion development team, to give early consideration to this aspect of space propulsion and space transportation work.
Lunar Atmosphere and Dust Environment Explorer Integration and Test
NASA Technical Reports Server (NTRS)
Wright, Michael R.; McCormick, John L.; Hoffman, Richard G.
2010-01-01
Integration and test (I&T) of the Lunar Atmosphere and Dust Environment Explorer (LADEE) is presented. A collaborative NASA project between Goddard Space Flight Center and Ames Research Center, LADEE's mission is to explore the low lunar orbit environment and exosphere for constituents. Its instruments include two spectrometers, a dust detector, and a laser communication technology demonstration. Although a relatively low-cost spacecraft, LADEE has I&T requirements typical of most planetary probes, such as prelaunch contamination control, sterilization, and instrument calibration. To lead to a successful mission, I&T at the spacecraft, instrument, and observatory level must include step-by-step and end-to-end functional, environmental, and performance testing. Due to its compressed development schedule, LADEE I&T planning requires adjusting test flows and sequences to account for long-lead critical-path items and limited spares. A protoflight test-level strategy is also baselined. However, the program benefits from having two independent but collaborative teams of engineers, managers, and technicians that have a wealth of flight project experience. This paper summarizes the LADEE I&T planning, flow, facilities, and probe-unique processes. Coordination of requirements and approaches to I&T when multiple organizations are involved is discussed. Also presented are cost-effective approaches to I&T that are transferable to most any spaceflight project I&T program.
SciBox, an end-to-end automated science planning and commanding system
NASA Astrophysics Data System (ADS)
Choo, Teck H.; Murchie, Scott L.; Bedini, Peter D.; Steele, R. Josh; Skura, Joseph P.; Nguyen, Lillian; Nair, Hari; Lucks, Michael; Berman, Alice F.; McGovern, James A.; Turner, F. Scott
2014-01-01
SciBox is a new technology for planning and commanding science operations for Earth-orbital and planetary space missions. It has been incrementally developed since 2001 and demonstrated on several spaceflight projects. The technology has matured to the point that it is now being used to plan and command all orbital science operations for the MErcury Surface, Space ENvironment, GEochemistry, and Ranging (MESSENGER) mission to Mercury. SciBox encompasses the derivation of observing sequences from science objectives, the scheduling of those sequences, the generation of spacecraft and instrument commands, and the validation of those commands prior to uploading to the spacecraft. Although the process is automated, science and observing requirements are incorporated at each step by a series of rules and parameters to optimize observing opportunities, which are tested and validated through simulation and review. Except for limited special operations and tests, there is no manual scheduling of observations or construction of command sequences. SciBox reduces the lead time for operations planning by shortening the time-consuming coordination process, reduces cost by automating the labor-intensive processes of human-in-the-loop adjudication of observing priorities, reduces operations risk by systematically checking constraints, and maximizes science return by fully evaluating the trade space of observing opportunities to meet MESSENGER science priorities within spacecraft recorder, downlink, scheduling, and orbital-geometry constraints.
Preparing GMAT for Operational Maneuver Planning of the Advanced Composition Explorer (ACE)
NASA Technical Reports Server (NTRS)
Qureshi, Rizwan Hamid; Hughes, Steven P.
2014-01-01
The General Mission Analysis Tool (GMAT) is an open-source space mission design, analysis and trajectory optimization tool. GMAT is developed by a team of NASA, private industry, public and private contributors. GMAT is designed to model, optimize and estimate spacecraft trajectories in flight regimes ranging from low Earth orbit to lunar applications, interplanetary trajectories and other deep space missions. GMAT has also been flight qualified to support operational maneuver planning for the Advanced Composition Explorer (ACE) mission. ACE was launched in August, 1997 and is orbiting the Sun-Earth L1 libration point. The primary science objective of ACE is to study the composition of both the solar wind and the galactic cosmic rays. Operational orbit determination, maneuver operations and product generation for ACE are conducted by NASA Goddard Space Flight Center (GSFC) Flight Dynamics Facility (FDF). This paper discusses the entire engineering lifecycle and major operational certification milestones that GMAT successfully completed to obtain operational certification for the ACE mission. Operational certification milestones such as gathering of the requirements for ACE operational maneuver planning, gap analysis, test plans and procedures development, system design, pre-shadow operations, training to FDF ACE maneuver planners, shadow operations, Test Readiness Review (TRR) and finally Operational Readiness Review (ORR) are discussed. These efforts have demonstrated that GMAT is flight quality software ready to support ACE mission operations in the FDF.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Malkewicz, Nicholas; Kirksey, Jim; Finley, Robert
2015-05-01
Executive Summary The Illinois Basin – Decatur Project (IBDP) is managed by the Midwest Geological Sequestration Consortium (MGSC) and is led by the Illinois State Geological Survey (ISGS) at the University of Illinois. The project site is located on the Archer Daniels Midland Company (ADM) property in Decatur, Illinois, and is a fully integrated carbon capture and storage (CCS) project that uses CO₂ captured from the ethanol-producing fermentation process at the ADM corn-processing plant (Finley et. al., 2013). IBDP has a goal of injecting one million tonnes of CO₂ into the basal sands of the Mt. Simon Sandstone over amore » three-year period. This is a multifaceted project, and this report details the planning and results of the drilling, completions, well testing, log data acquisition, and the Health, Safety, and Environment (HSE) aspects of the project. Three deep wells were planned for the IBDP: • The injection well: Injection Well #1 (CCS1); • The monitoring well (both in-zone and above seal): Verification Well #1 (VW1); and • The geophone monitoring well: Geophysical Monitoring Well #1 (GM1). The detailed plans for these wells are attached to the appendices of this document. The wells were drilled successfully with little deviation from the original plans. The biggest change from the plan to execution was the need to adjust for larger-than-expected loss of circulation in the Potosi section of the Knox Formation. The completions reports also attached to this document detail the well constructions as they were actually built. Injectivity testing was carried out, and the perforating plans were adjusted based on the results. Additional perforations and acidizing were performed as a result of the injectivity testing. The testing plans are detailed in this report along with the actual testing results. The injectivity testing results were used in the modeling and simulation efforts. Detailed HSE plans were developed and implemented during the planning and execution phases of the project. The implementation included an HSE Bridging Document, which served to unify the HSE policies of the project partners and key subcontractors. The HSE plan and actual HSE results are presented in this document. There were no recordable HSE incidents during the project. A detailed logging program was developed based on project needs. The log data were acquired in accordance with the plan, and both the plan and log results are presented in this report. Log data were heavily utilized by the research staff, modelers, reservoir engineers, and for technical and permitting efforts. 5 Several key lessons were learned during the project: • Safety in operations and execution is paramount and is only achieved through proper planning and behavior control. The certainty of this was reinforced through implementation of this lesson and the resultant flawless HSE performance during the project. • Losses of drilling fluid circulation were larger than anticipated within the Potosi Formation. Circulation was only recovered through cementing the loss zones. • When possible, minimizing complexity in permit requirements and well designs is preferable. • The size of the wells were outside of the standard experience and expertise typical within the basin, and therefore required substantial planning and ramp-up of contractors and partners to meet project objectives. • With multiple stakeholders and research partners, establishing objectives and requirements early and adhering to change request procedures throughout the project are critical to manage competing data and sampling objectives that may be detrimental to overall progress. The well construction and completion operations were successfully executed, with all wells built in a manner that achieved excellent wellbore integrity. Log planning involved a number of stakeholders and technical specialists. Data collection from logging, coring, and testing was excellent. Time and effort spent with the associated contractors and suppliers to develop a well plan beyond normal scope proved highly successful, resulting in a well-construction and completion project that surpassed expectations. The world-class HSE results also demonstrate the commitment of all stakeholders in the project. The details follow in the body of this document« less
Lunar Simulants, Analogues, and Standards: Needs and Realities for Mission Technologies Development
NASA Technical Reports Server (NTRS)
Sibille, Laurent
2013-01-01
Integration of In-Situ Resource Utilization (ISRU) capabilities into missions present both challenges as well as benefits for future missions to the Moon and Mars. However, since ISRU systems and capabilities have not flown, mission planners have been hesitant to include ISRU capabilities in mission critical roles, thereby significantly reducing the benefits that ISRU can provide in mission mass and cost reductions. For ISRU systems to provide products and services to 'customers' such as life support, propulsion, and power systems, close development of requirements, hardware, and operations between ISRU and these systems are required. To address these development and incorporation challenges, NASA and csA initiated a series of analog field test demonstrations at sites in Hawaii. Two tests completed in November of 2008 and February of 2010 have demonstrate all the critical steps in operating ISRU systems on the lunar surface at relevant mission scales as well as integration with power and propulsion systems. The third field test planned for July 2012 will demonstrate that a mission to the lunar poles to locate and characterize ice and other volatiles is possible in a highly integrated mission with multiple space agencies. These analog field tests have shown that not only are ISRU systems feasible at relevant mission scales, that they can be successfully integrated into mission architectures.
Testing Iodine as a New Fuel for Cathodes
NASA Astrophysics Data System (ADS)
Glad, Harley; Branam, Richard; Rogers, Jim; Warren, Matthew; Burleson, Connor; Siy, Grace
2017-11-01
The objective of this research is to demonstrate the viability of using iodine as an alternative space propulsion propellant. The demonstration requires the testing of a cathode with xenon and then the desired element iodine. Currently, cathodes run on noble gases such as xenon which must be stored in high pressure canisters and is very expensive. These shortcomings have led to researching possible substitutes. Iodine was decided as a suitable candidate because it's cheaper, can be stored as a solid, and has similar mass properties as xenon. In this research, cathodes will be placed in a vacuum chamber and operated on both gases to observe their performance, allowing us to gain a better understanding of iodine's behavior. Several planned projects depend on the knowledge gained from this project, such as larger scaled tests and iodine fed hall thrusters. The tasks of this project included protecting the stainless-steel vacuum chamber by gold plating and Teflon® coating, building a stand to hold the cathode, creating an anode resistant to iodine, and testing the cathode once setup was complete. The successful operation of the cathode was demonstrated. However, the experimental setup proved ineffective at controlling the iodine flow. Current efforts are focused on this problem. REU Site: Fluid Mechanics with Analysis using Computations and Experiments NSF Grant EEC 1659710.
Thermo-mechanical evaluation of carbon-carbon primary structure for SSTO vehicles
NASA Astrophysics Data System (ADS)
Croop, Harold C.; Lowndes, Holland B.; Hahn, Steven E.; Barthel, Chris A.
1998-01-01
An advanced development program to demonstrate carbon-carbon composite structure for use as primary load carrying structure has entered the experimental validation phase. The component being evaluated is a wing torque box section for a single-stage-to-orbit (SSTO) vehicle. The validation or demonstration component features an advanced carbon-carbon design incorporating 3D woven graphite preforms, integral spars, oxidation inhibited matrix, chemical vapor deposited (CVD) oxidation protection coating, and ceramic matrix composite fasteners. The validation component represents the culmination of a four phase design and fabrication development effort. Extensive developmental testing was performed to verify material properties and integrity of basic design features before committing to fabrication of the full scale box. The wing box component is now being set up for testing in the Air Force Research Laboratory Structural Test Facility at Wright-Patterson Air Force Base, Ohio. One of the important developmental tests performed in support of the design and planned testing of the full scale box was the fabrication and test of a skin/spar trial subcomponent. The trial subcomponent incorporated critical features of the full scale wing box design. This paper discusses the results of the trial subcomponent test which served as a pathfinder for the upcoming full scale box test.
Space Technology 5 Launch and Operations
NASA Technical Reports Server (NTRS)
O'Donnell, James R.; Concha, Marco A.; Morrissey, James R.; Placanica, Samuel J.; Russo, Angela M.; Tsai, Dean C.
2007-01-01
The three spacecraft that made up the Space Technology 5 (ST5) mission were successfully launched and deployed from their Pegasus launch vehicle on March 22, 2006. Final contact with the spacecraft occurred on June 30, 2006, with all Level 1 requirements met. By the end of the mission, all ST5 technologies had been validated, all on-board attitude control system (ACS) modes had been successfully demonstrated, and the desired constellation configurations had been achieved to demonstrate the ability of small spacecraft to take quality science measurements, However, during those 100 days (ST5 was planned to be a 90-day mission), there were a number of anomalies that made achieving the mission goals very challenging. This paper will discuss: the chronology of the ST5 launch and early operations, work performed to diagnose and work-around a sun sensor anomaly, spacecraft tests devised to demonstrate correct operation of all onboard ACS modes, the maneuver plan performed to achieve the desired constellation, investigations performed by members of the ST5 GN&C and Science teams of an anomalous spin down condition, and the end-of-life orbit and passivating operations performed on the three spacecraft.
NASA Astrophysics Data System (ADS)
Wright, M. W.; Wilkerson, M. W.; Tang, R. R.
2017-11-01
Qualification testing of fiber based laser transmitters is required for NASA's Deep Space Optical Communications program to mature the technology for space applications. In the absence of fully space qualified systems, commercial systems have been investigated in order to demonstrate the robustness of the technology. To this end, a 2.5 W fiber based laser source was developed as the transmitter for an optical communications experiment flown aboard the ISS as a part of a technology demonstration mission. The low cost system leveraged Mil Standard design principles and Telcordia certified components to the extent possible and was operated in a pressure vessel with active cooling. The laser was capable of high rate modulation but was limited by the mission requirements to 50 Mbps for downlinking stored video from the OPALS payload, externally mounted on the ISS. Environmental testing and space qualification of this unit will be discussed along with plans for a fully space qualified laser transmitter.
DOE Office of Scientific and Technical Information (OSTI.GOV)
K. Payette; D. Tillman
During the period July 1, 2001--September 30, 2001, Allegheny Energy Supply Co., LLC (Allegheny) continued construction of the Willow Island cofiring project, completed the installation of the fuel storage facility, the fuel receiving facility, and the processing building. All mechanical equipment has been installed and electrical construction has proceeded. During this time period significant short term testing of the Albright Generating Station cofiring facility was completed, and the 100-hour test was planned for early October. The testing demonstrated that cofiring at the Albright Generating Station could contribute to a ''4P Strategy''--reduction of SO{sub 2}, NO{sub x}, mercury, and greenhouse gasmore » emissions. This report summarizes the activities associated with the Designer Opportunity Fuel program, and demonstrations at Willow Island and Albright Generating Stations. It details the construction activities at both sites along with the combustion modeling at the Willow Island site.« less
Rhenium Rocket Manufacturing Technology
NASA Technical Reports Server (NTRS)
1997-01-01
The NASA Lewis Research Center's On-Board Propulsion Branch has a research and technology program to develop high-temperature (2200 C), iridium-coated rhenium rocket chamber materials for radiation-cooled rockets in satellite propulsion systems. Although successful material demonstrations have gained much industry interest, acceptance of the technology has been hindered by a lack of demonstrated joining technologies and a sparse materials property data base. To alleviate these concerns, we fabricated rhenium to C-103 alloy joints by three methods: explosive bonding, diffusion bonding, and brazing. The joints were tested by simulating their incorporation into a structure by welding and by simulating high-temperature operation. Test results show that the shear strength of the joints degrades with welding and elevated temperature operation but that it is adequate for the application. Rhenium is known to form brittle intermetallics with a number of elements, and this phenomena is suspected to cause the strength degradation. Further bonding tests with a tantalum diffusion barrier between the rhenium and C-103 is planned to prevent the formation of brittle intermetallics.
26 CFR 1.401(a)(26)-7 - Testing methods.
Code of Federal Regulations, 2013 CFR
2013-04-01
... 26 Internal Revenue 5 2013-04-01 2013-04-01 false Testing methods. 1.401(a)(26)-7 Section 1.401(a... Testing methods. (a) Testing on each day of the plan year. A plan satisfies section 401(a)(26) for a plan... the year under the rules in § 1.401(a)(26)-5. (b) Simplified testing method. A plan is treated as...
26 CFR 1.401(a)(26)-7 - Testing methods.
Code of Federal Regulations, 2011 CFR
2011-04-01
... 26 Internal Revenue 5 2011-04-01 2011-04-01 false Testing methods. 1.401(a)(26)-7 Section 1.401(a... Testing methods. (a) Testing on each day of the plan year. A plan satisfies section 401(a)(26) for a plan... the year under the rules in § 1.401(a)(26)-5. (b) Simplified testing method. A plan is treated as...
26 CFR 1.401(a)(26)-7 - Testing methods.
Code of Federal Regulations, 2014 CFR
2014-04-01
... 26 Internal Revenue 5 2014-04-01 2014-04-01 false Testing methods. 1.401(a)(26)-7 Section 1.401(a... Testing methods. (a) Testing on each day of the plan year. A plan satisfies section 401(a)(26) for a plan... the year under the rules in § 1.401(a)(26)-5. (b) Simplified testing method. A plan is treated as...
26 CFR 1.401(a)(26)-7 - Testing methods.
Code of Federal Regulations, 2012 CFR
2012-04-01
... 26 Internal Revenue 5 2012-04-01 2011-04-01 true Testing methods. 1.401(a)(26)-7 Section 1.401(a... Testing methods. (a) Testing on each day of the plan year. A plan satisfies section 401(a)(26) for a plan... the year under the rules in § 1.401(a)(26)-5. (b) Simplified testing method. A plan is treated as...
Environmental control medical support team
NASA Technical Reports Server (NTRS)
Crump, William J.; Kilgore, Melvin V., Jr.
1988-01-01
The activities conducted in support of the Environmental Control and Life Support Team during December 7, 1987 through September 30, 1988 are summarized. The majority of the ongoing support has focused on the ECLSS area. Through a series of initial meetings with the ECLSS team and technical literature review, an initial list of critical topics was developed. Subtasks were then identified or additional related tasks received as action items from the ECLSS group meetings. Although most of the efforts focused on providing MSFC personnel with information regarding specific questions and problems related to ECLSS issues, other efforts regarding identifying an ECLSS Medical Support Team and constructing data bases of technical information were also initiated and completed. The specific tasks are as follows: (1) Provide support to the mechanical design and integration of test systems as related to microbiological concerns; (2) Assist with design of Human Subjects Test Protocols; (3) Interpretation and recommendations pertaining to air/water quality requirements; (4) Assist in determining the design specifications required as related to the Technical Demonstration Program; (5) Develop a data base of all microorganisms recovered from previous subsystem testing; (6) Estimates of health risk of individual microbes to test subjects; (7) Assist with setting limits for safety of test subjects; (8) Health monitoring of test subjects; (9) Assist in the preparation of test plans; (10) Assist in the development of a QA/QC program to assure the validity, accuracy and precision of the analyses; and (11) Assist in developing test plans required for future man in the loop testing.
Sudore, Rebecca L.; Stewart, Anita L.; Knight, Sara J.; McMahan, Ryan D.; Feuz, Mariko; Miao, Yinghui; Barnes, Deborah E.
2013-01-01
Introduction Advance directives have traditionally been considered the gold standard for advance care planning. However, recent evidence suggests that advance care planning involves a series of multiple discrete behaviors for which people are in varying stages of behavior change. The goal of our study was to develop and validate a survey to measure the full advance care planning process. Methods The Advance Care Planning Engagement Survey assesses “Process Measures” of factors known from Behavior Change Theory to affect behavior (knowledge, contemplation, self-efficacy, and readiness, using 5-point Likert scales) and “Action Measures” (yes/no) of multiple behaviors related to surrogate decision makers, values and quality of life, flexibility for surrogate decision making, and informed decision making. We administered surveys at baseline and 1 week later to 50 diverse, older adults from San Francisco hospitals. Internal consistency reliability of Process Measures was assessed using Cronbach's alpha (only continuous variables) and test-retest reliability of Process and Action Measures was examined using intraclass correlations. For discriminant validity, we compared Process and Action Measure scores between this cohort and 20 healthy college students (mean age 23.2 years, SD 2.7). Results Mean age was 69.3 (SD 10.5) and 42% were non-White. The survey took a mean of 21.4 minutes (±6.2) to administer. The survey had good internal consistency (Process Measures Cronbach's alpha, 0.94) and test-retest reliability (Process Measures intraclass correlation, 0.70; Action Measures, 0.87). Both Process and Action Measure scores were higher in the older than younger group, p<.001. Conclusion A new Advance Care Planning Engagement Survey that measures behavior change (knowledge, contemplation, self-efficacy, and readiness) and multiple advance care planning actions demonstrates good reliability and validity. Further research is needed to assess whether survey scores improve in response to advance care planning interventions and whether scores are associated with receipt of care consistent with one's wishes. PMID:24039772
2010-03-11
IEP /TDP) or Independent Assessment Plan (IAP), and the test item and the procedures as outlined in this TOP. The following must also be considered...Command DTIC = Defense Technical Information Center DTP = Detailed Test Plan IAP = Independent Assessment Plan IEP = Independent Evaluation Plan IPT
Layton, Timothy J; Ryan, Andrew M
2015-12-01
To evaluate the effects of the size of financial bonuses on quality of care and the number of plan offerings in the Medicare Advantage Quality Bonus Payment Demonstration. Publicly available data from CMS from 2009 to 2014 on Medicare Advantage plan quality ratings, the counties in the service area of each plan, and the benchmarks used to construct plan payments. The Medicare Advantage Quality Bonus Payment Demonstration began in 2012. Under the Demonstration, all Medicare Advantage plans were eligible to receive bonus payments based on plan-level quality scores (star ratings). In some counties, plans were eligible to receive bonus payments that were twice as large as in other counties. We used this variation in incentives to evaluate the effects of bonus size on star ratings and the number of plan offerings in the Demonstration using a differences-in-differences identification strategy. We used matching to create a comparison group of counties that did not receive double bonuses but had similar levels of the preintervention outcomes. Results from the difference-in-differences analysis suggest that the receipt of double bonuses was not associated with an increase in star ratings. In the matched sample, the receipt of double bonuses was associated with a statistically insignificant increase of +0.034 (approximately 1 percent) in the average star rating (p > .10, 95 percent CI: -0.015, 0.083). In contrast, the receipt of double bonuses was associated with an increase in the number of plans offered. In the matched sample, the receipt of double bonuses was associated with an overall increase of +0.814 plans (approximately 5.8 percent) (p < .05, 95 percent CI: 0.078, 1.549). We estimate that the double bonuses increased payments by $3.43 billion over the first 3 years of the Demonstration. At great expense to Medicare, double bonuses in the Medicare Advantage Quality Bonus Payment Demonstration were not associated with improved quality but were associated with more plan offerings. © Health Research and Educational Trust.
Poster - 40: Treatment Verification of a 3D-printed Eye Phantom for Proton Therapy
DOE Office of Scientific and Technical Information (OSTI.GOV)
Dunning, Chelsea; Lindsay, Clay; Unick, Nick
Purpose: Ocular melanoma is a form of eye cancer which is often treated using proton therapy. The benefit of the steep proton dose gradient can only be leveraged for accurate patient eye alignment. A treatment-planning program was written to plan on a 3D-printed anatomical eye-phantom, which was then irradiated to demonstrate the feasibility of verifying in vivo dosimetry for proton therapy using PET imaging. Methods: A 3D CAD eye model with critical organs was designed and voxelized into the Monte-Carlo transport code FLUKA. Proton dose and PET isotope production were simulated for a treatment plan of a test tumour, generatedmore » by a 2D treatment-planning program developed using NumPy and proton range tables. Next, a plastic eye-phantom was 3D-printed from the CAD model, irradiated at the TRIUMF Proton Therapy facility, and imaged using a PET scanner. Results: The treatment-planning program prediction of the range setting and modulator wheel was verified in FLUKA to treat the tumour with at least 90% dose coverage for both tissue and plastic. An axial isotope distribution of the PET isotopes was simulated in FLUKA and converted to PET scan counts. Meanwhile, the 3D-printed eye-phantom successfully yielded a PET signal. Conclusions: The 2D treatment-planning program can predict required parameters to sufficiently treat an eye tumour, which was experimentally verified using commercial 3D-printing hardware to manufacture eye-phantoms. Comparison between the simulated and measured PET isotope distribution could provide a more realistic test of eye alignment, and a variation of the method using radiographic film is being developed.« less
Kersten, Paula; McPherson, Kathryn M; Kayes, Nicola M; Theadom, Alice; McCambridge, Alana
2015-01-01
To test the feasibility and acceptability of an implementation intention strategy (if-then plans) increasingly used in health psychology to bridge the goal intention-action gap in rehabilitation with people with neurological conditions who are experiencing difficulties with mobility. Twenty people with multiple sclerosis (MS) and stroke, randomised to an experimental and control group, set up to three mobility related goals with a physiotherapist. The experimental group also formulated if-then plans for every goal. Focus groups and interviews with participants and therapists; Patient Activation Measure (PAM), 10-m walk test, Rivermead Mobility Index, self-efficacy, subjective health status, quality of life. Qualitative data highlighted one main theme: Rehabilitation in context, encapsulating the usefulness of the if-then strategy in thinking about the patient in the context of complexity, the usefulness of home-based rehabilitation, and the perceived need for a few more sessions. Changes in walking speed were in the expected direction for both groups; PAM scores improved over 3 months in both groups. If-then plans were feasible and acceptable in bridging the goal intention-action gap in rehabilitation with people with MS and stroke, who are experiencing difficulties with mobility. This approach can now be adapted and trialled further in a definitive study. Goal planning in rehabilitation necessitates specific strategies that help people engage in goal-related tasks. If-then plans aim to support people to deal more effectively with self-regulatory problems that might undermine goal striving and have been found to be effective in health promotion and health behaviour change. This feasibility study with people with a stroke and multiple sclerosis has demonstrated that if-then plans are feasible and acceptable to patients and physiotherapists in supporting goal-directed behaviour.
NASA Technical Reports Server (NTRS)
Shambayati, Shervin; Davarian, Faramaz; Morabito, David
2004-01-01
NASA is planning an engineering telemetry demonstration with Mars Reconnaissance Orbiter (MRO). Capabilities of Ka-band (32 GHz) for use with deep space mission are demonstrated using the link optimization algorithms and weather forecasting. Furthermore, based on the performance of previous deep space missions with Ka-band downlink capabilities, experiment plans are developed for telemetry operations during superior solar conjunction. A general overview of the demonstration is given followed by a description of the mission planning during cruise, the primary science mission and superior conjunction. As part of the primary science mission planning the expected data return for various data optimization methods is calculated. These results indicate that, given MRO's data rates, a link optimized to use of at most two data rates, subject to a minimum availability of 90%, performs almost as well as a link with no limits on the number of data rates subject to the same minimum availability.
NASA Technical Reports Server (NTRS)
Sauerwein, Timothy A.; Gostomski, Tom
2007-01-01
The Space Technology 5(ST5) payload was successfully carried into orbit on an OSC Pegasus XL launch vehicle, which was carried aloft and dropped from the OSC Lockheed L-1011 from Vandenberg Air Force Base March 22,2006, at 9:03 am Eastern time, 6:03 am Pacific time. In order to reach the completion of the development and successful launch of ST 5, the systems integration and test(I&T) team determined that a different approach was required to meet the project requirements rather than the standard I&T approach used for single, room-sized satellites. The ST5 payload, part of NASA's New Millennium Program headquartered at JPL, consisted of three micro satellites (approximately 30 kg each) and the Pegasus Support Structure (PSS), the system that connected the spacecrafts to the launch vehicle and deployed the spacecrafts into orbit from the Pegasus XL launch vehicle. ST5 was a technology demonstration payload, intended to test six (6) new technologies for potential use for future space flights along with demonstrating the ability of small satellites to perform quality science. The main technology was a science grade magnetometer designed to take measurements of the earth's magnetic field. The three spacecraft were designed, integrated, and tested at NASA Goddard Space Flight Center with integration and environmental testing occurring in the Bldg. 7-1 0-15-29. The three spacecraft were integrated and tested by the same I&T team. The I&T Manager determined that there was insufficient time in the schedule to perform the three I&T spacecraft activities in series used standard approaches. The solution was for spacecraft #1 to undergo integration and test first, followed by spacecraft #2 and #3 simultaneously. This simultaneous integration was successful for several reasons. Each spacecraft had a Lead Test Conductor who planned and coordinated their spacecraft through its integration and test activities. One team of engineers and technicians executed the integration of all three spacecraft, learning and gaining knowledge and efficiency as spacecraft #1 integration and testing progressed. They became acutely familiar with the hardware, operation and processes for I&T, thus each team member had the experience and knowledge to safely execute I&T for spacecraft #2 and #3 together. The integration team was very versatile and each member could perform many different activities or work any spacecraft, when needed. Daily meetings between the three Lead TCs and technician team allowed the team to plan and implement activities efficiently. The three (3) spacecraft and PSS were successfully integrated and tested, shipped to the launch site, and ready for launch per the I&T schedule that was planned three years previously.
JWST Wavefront Sensing and Control: Operations Plans, Demonstrations, and Status
NASA Astrophysics Data System (ADS)
Perrin, Marshall; Acton, D. Scott; Lajoie, Charles-Philippe; Knight, J. Scott; Myers, Carey; Stark, Chris; JWST Wavefront Sensing & Control Team
2018-01-01
After JWST launches and unfolds in space, its telescope optics will be aligned through a complex series of wavefront sensing and control (WFSC) steps to achieve diffraction-limited performance. This iterative process will comprise about half of the observatory commissioning time (~ 3 out of 6 months). We summarize the JWST WFSC process, schedule, and expectations for achieved performance, and discuss our team’s activities to prepare for an effective & efficient telescope commissioning. During the recently-completed OTIS cryo test at NASA JSC, WFSC demonstrations showed the flight-like operation of the entire JWST active optics and WFSC system from end to end, including all hardware and software components. In parallel, the same test data were processed through the JWST Mission Operations Center at STScI to demonstrate the readiness of ground system components there (such as the flight operations system, data pipelines, archives, etc). Moreover, using the Astronomer’s Proposal Tool (APT), the entire telescope commissioning program has been implemented, reviewed, and is ready for execution. Between now and launch our teams will continue preparations for JWST commissioning, including further rehearsals and testing, to ensure a successful alignment of JWST’s telescope optics.
Dols, W. Stuart; Persily, Andrew K.; Morrow, Jayne B.; Matzke, Brett D.; Sego, Landon H.; Nuffer, Lisa L.; Pulsipher, Brent A.
2010-01-01
In an effort to validate and demonstrate response and recovery sampling approaches and technologies, the U.S. Department of Homeland Security (DHS), along with several other agencies, have simulated a biothreat agent release within a facility at Idaho National Laboratory (INL) on two separate occasions in the fall of 2007 and the fall of 2008. Because these events constitute only two realizations of many possible scenarios, increased understanding of sampling strategies can be obtained by virtually examining a wide variety of release and dispersion scenarios using computer simulations. This research effort demonstrates the use of two software tools, CONTAM, developed by the National Institute of Standards and Technology (NIST), and Visual Sample Plan (VSP), developed by Pacific Northwest National Laboratory (PNNL). The CONTAM modeling software was used to virtually contaminate a model of the INL test building under various release and dissemination scenarios as well as a range of building design and operation parameters. The results of these CONTAM simulations were then used to investigate the relevance and performance of various sampling strategies using VSP. One of the fundamental outcomes of this project was the demonstration of how CONTAM and VSP can be used together to effectively develop sampling plans to support the various stages of response to an airborne chemical, biological, radiological, or nuclear event. Following such an event (or prior to an event), incident details and the conceptual site model could be used to create an ensemble of CONTAM simulations which model contaminant dispersion within a building. These predictions could then be used to identify priority area zones within the building and then sampling designs and strategies could be developed based on those zones. PMID:27134782
Dols, W Stuart; Persily, Andrew K; Morrow, Jayne B; Matzke, Brett D; Sego, Landon H; Nuffer, Lisa L; Pulsipher, Brent A
2010-01-01
In an effort to validate and demonstrate response and recovery sampling approaches and technologies, the U.S. Department of Homeland Security (DHS), along with several other agencies, have simulated a biothreat agent release within a facility at Idaho National Laboratory (INL) on two separate occasions in the fall of 2007 and the fall of 2008. Because these events constitute only two realizations of many possible scenarios, increased understanding of sampling strategies can be obtained by virtually examining a wide variety of release and dispersion scenarios using computer simulations. This research effort demonstrates the use of two software tools, CONTAM, developed by the National Institute of Standards and Technology (NIST), and Visual Sample Plan (VSP), developed by Pacific Northwest National Laboratory (PNNL). The CONTAM modeling software was used to virtually contaminate a model of the INL test building under various release and dissemination scenarios as well as a range of building design and operation parameters. The results of these CONTAM simulations were then used to investigate the relevance and performance of various sampling strategies using VSP. One of the fundamental outcomes of this project was the demonstration of how CONTAM and VSP can be used together to effectively develop sampling plans to support the various stages of response to an airborne chemical, biological, radiological, or nuclear event. Following such an event (or prior to an event), incident details and the conceptual site model could be used to create an ensemble of CONTAM simulations which model contaminant dispersion within a building. These predictions could then be used to identify priority area zones within the building and then sampling designs and strategies could be developed based on those zones.