DOT National Transportation Integrated Search
2006-01-01
The purpose of this study was to identify and document the core functions of the Virginia Department of Transportation's (VDOT) Safety Service Patrol (SSP) programs and to develop a deployment planning tool that would help VDOT decision-makers when c...
DOT National Transportation Integrated Search
1997-09-01
Integration of intelligent transportation systems (ITS) within a metropolitan area is crucial for effective deployment. The Early Deployment Planning (EDP) Process is one tool that allows transportation officials to plan for and implement ITS technol...
DOT National Transportation Integrated Search
2008-12-15
Intelligent Transportation Systems (ITS) planning requires the use of tools to assess the performance of ITS deployment alternatives relative to each other and to other types of transportation system improvement alternatives. This research project in...
Feasibility Assessment of ITS Deployment Analysis System (IDAS) for ITS Evaluation
DOT National Transportation Integrated Search
2003-12-01
This study investigated the feasibility of utilizing the ITS Deployment Analysis System (IDAS) program version 2.2 as a tool for evaluating Intelligent Transportation Systems (ITS) deployment plans. Firstly, an online survey was conducted among metro...
Lessons learned in deploying software estimation technology and tools
NASA Technical Reports Server (NTRS)
Panlilio-Yap, Nikki; Ho, Danny
1994-01-01
Developing a software product involves estimating various project parameters. This is typically done in the planning stages of the project when there is much uncertainty and very little information. Coming up with accurate estimates of effort, cost, schedule, and reliability is a critical problem faced by all software project managers. The use of estimation models and commercially available tools in conjunction with the best bottom-up estimates of software-development experts enhances the ability of a product development group to derive reasonable estimates of important project parameters. This paper describes the experience of the IBM Software Solutions (SWS) Toronto Laboratory in selecting software estimation models and tools and deploying their use to the laboratory's product development groups. It introduces the SLIM and COSTAR products, the software estimation tools selected for deployment to the product areas, and discusses the rationale for their selection. The paper also describes the mechanisms used for technology injection and tool deployment, and concludes with a discussion of important lessons learned in the technology and tool insertion process.
Comprehensive Smart Grid Planning in a Regulated Utility Environment
NASA Astrophysics Data System (ADS)
Turner, Matthew; Liao, Yuan; Du, Yan
2015-06-01
This paper presents the tools and exercises used during the Kentucky Smart Grid Roadmap Initiative in a collaborative electric grid planning process involving state regulators, public utilities, academic institutions, and private interest groups. The mandate of the initiative was to assess the existing condition of smart grid deployments in Kentucky, to enhance understanding of smart grid concepts by stakeholders, and to develop a roadmap for the deployment of smart grid technologies by the jurisdictional utilities of Kentucky. Through involvement of many important stakeholder groups, the resultant Smart Grid Deployment Roadmap proposes an aggressive yet achievable strategy and timetable designed to promote enhanced availability, security, efficiency, reliability, affordability, sustainability and safety of the electricity supply throughout the state while maintaining Kentucky's nationally competitive electricity rates. The models and methods developed for this exercise can be utilized as a systematic process for the planning of coordinated smart grid deployments.
A System Trade Study of Remote Infrared Imaging for Space Shuttle Reentry
NASA Technical Reports Server (NTRS)
Schwartz, Richard J.; Ross, Martin N.; Baize, Rosemary; Horvath, Thomas J.; Berry, Scott A.; Krasa, Paul W.
2008-01-01
A trade study reviewing the primary operational parameters concerning the deployment of imaging assets in support of the Hypersonic Thermodynamic Infrared Measurements (HYTHIRM) project was undertaken. The objective was to determine key variables and constraints for obtaining thermal images of the Space Shuttle orbiter during reentry. The trade study investigated the performance characteristics and operating environment of optical instrumentation that may be deployed during a HYTHIRM data collection mission, and specified contributions to the Point Spread Function. It also investigated the constraints that have to be considered in order to optimize deployment through the use of mission planning tools. These tools simulate the radiance modeling of the vehicle as well as the expected spatial resolution based on the Orbiter trajectory and placement of land based or airborne optical sensors for given Mach numbers. Lastly, this report focused on the tools and methodology that have to be in place for real-time mission planning in order to handle the myriad of variables such as trajectory ground track, weather, and instrumentation availability that may only be known in the hours prior to landing.
DOT National Transportation Integrated Search
2009-09-01
More and more, transportation system operators are seeing the benefits of strengthening links between planning and operations. A critical element in improving transportation decision-making and the effectiveness of transportation systems related to o...
DOT National Transportation Integrated Search
2017-12-01
In designing an effective traffic management plan for non-recurrent congestion, it is critical for responsible highway agencies to have some vital information, such as estimated incident duration, resulting traffic queues, and the expected delays. Ov...
A Multi-Objective Method to Align Human Resource Allocation with University Strategy
ERIC Educational Resources Information Center
Bouillard, Philippe
2016-01-01
Universities are currently under considerable pressure to reach their stakeholders' expectations. Management tools that use strategic plans, key performance indicators and quality assurance methods are increasingly deployed. This paper aims to demonstrate how resource allocation can be aligned with institutional strategic plans with a very simple…
Decision support frameworks and tools for conservation
Schwartz, Mark W.; Cook, Carly N.; Pressey, Robert L.; Pullin, Andrew S.; Runge, Michael C.; Salafsky, Nick; Sutherland, William J.; Williamson, Matthew A.
2018-01-01
The practice of conservation occurs within complex socioecological systems fraught with challenges that require transparent, defensible, and often socially engaged project planning and management. Planning and decision support frameworks are designed to help conservation practitioners increase planning rigor, project accountability, stakeholder participation, transparency in decisions, and learning. We describe and contrast five common frameworks within the context of six fundamental questions (why, who, what, where, when, how) at each of three planning stages of adaptive management (project scoping, operational planning, learning). We demonstrate that decision support frameworks provide varied and extensive tools for conservation planning and management. However, using any framework in isolation risks diminishing potential benefits since no one framework covers the full spectrum of potential conservation planning and decision challenges. We describe two case studies that have effectively deployed tools from across conservation frameworks to improve conservation actions and outcomes. Attention to the critical questions for conservation project planning should allow practitioners to operate within any framework and adapt tools to suit their specific management context. We call on conservation researchers and practitioners to regularly use decision support tools as standard practice for framing both practice and research.
Pore, Meenal; Sengeh, David M.; Mugambi, Purity; Purswani, Nuri V.; Sesay, Tom; Arnold, Anna Lena; Tran, Anh-Minh A.; Myers, Ralph
2017-01-01
During the 2014 West African Ebola Virus outbreak it became apparent that the initial response to the outbreak was hampered by limitations in the collection, aggregation, analysis and use of data for intervention planning. As part of the post-Ebola recovery phase, IBM Research Africa partnered with the Port Loko District Health Management Team (DHMT) in Sierra Leone and GOAL Global, to design, implement and deploy a web-based decision support tool for district-level disease surveillance. This paper discusses the design process and the functionality of the first version of the system. The paper presents evaluation results prior to a pilot deployment and identifies features for future iterations. A qualitative assessment of the tool prior to pilot deployment indicates that it improves the timeliness and ease of using data for making decisions at the DHMT level. PMID:29854209
Region Three Aerial Measurement System Flight Planning Tool - 12006
DOE Office of Scientific and Technical Information (OSTI.GOV)
Messick, Chuck; Pham, Minh; Smith, Ron
The Region 3 Aerial Measurement System Flight Planning Tool is used by the National Nuclear Security Agency (NNSA), United States Department of Energy, Radiological Assistance Program, Region 3, to respond to emergency radiological situations. The tool automates the flight planning package process while decreasing Aerial Measuring System response times and decreases the potential for human error. Deployment of the Region Three Aerial Measurement System Flight Planning Tool has resulted in an immediate improvement to the flight planning process in that time required for mission planning has been reduced from 1.5 hours to 15 minutes. Anecdotally, the RAP team reports thatmore » the rate of usable data acquired during surveys has improved from 40-60 percent to over 90 percent since they began using the tool. Though the primary product of the flight planning tool is a pdf format document for use by the aircraft flight crew, the RAP team has begun carrying their laptop computer on the aircraft during missions. By connecting a Global Positioning System (GPS) device to the laptop and using ESRI ArcMap's GPS tool bar to overlay the aircraft position directly on the flight plan in real time, the RAP team can evaluate and correct the aircraft position as the mission is executed. (authors)« less
Safe teleradiology: information assurance as project planning methodology
NASA Astrophysics Data System (ADS)
Collmann, Jeff R.; Alaoui, Adil; Nguyen, Dan; Lindisch, David
2003-05-01
This project demonstrates use of OCTAVE, an information security risk assessment method, as an approach to the safe design and planning of a teleradiology system. By adopting this approach to project planning, we intended to provide evidence that including information security as an intrinsic component of project planning improves information assurance and that using information assurance as a planning tool produces and improves the general system management plan. Several considerations justify this approach to planning a safe teleradiology system. First, because OCTAVE was designed as a method for retrospectively assessing and proposing enhancements for the security of existing information management systems, it should function well as a guide to prospectively designing and deploying a secure information system such as teleradiology. Second, because OCTAVE provides assessment and planning tools for use primarily by interdisciplinary teams from user organizations, not consultants, it should enhance the ability of such teams at the local level to plan safe information systems. Third, from the perspective of sociological theory, OCTAVE explicitly attempts to enhance organizational conditions identified as necessary to safely manage complex technologies. Approaching information system design from the perspective of information security risk management proactively integrates health information assurance into a project"s core. This contrasts with typical approaches that perceive "security" as a secondary attribute to be "added" after designing the system and with approaches that identify information assurance only with security devices and user training. The perspective of health information assurance embraces so many dimensions of a computerized health information system"s design that one may successfully deploy a method for retrospectively assessing information security risk as a prospective planning tool. From a sociological perspective, this approach enhances the general conditions as well as establishes specific policies and procedures for reliable performance of health information assurance.
[Quality planning of Family Health Units using Quality Function Deployment (QFD)].
Volpato, Luciana Fernandes; Meneghim, Marcelo de Castro; Pereira, Antonio Carlos; Ambrosano, Gláucia Maria Bovi
2010-08-01
Quality is an indispensible requirement in the health field, and its pursuit is necessary in order to meet demands by a population that is aware of its rights, as part of the essence of good work relations, and to decrease technological costs. Quality thus involves all parties to the process (users and professionals), and is no longer merely an attribute of the health service. This study aimed to verify the possibility of quality planning in the Family Health Units, using Quality Function Deployment (QFD). QFD plans quality according to user satisfaction, involving staff professionals and identifying new approaches to improve work processes. Development of the array, called the House of Quality, is this method's most important characteristics. The results show a similarity between the quality demanded by users and the quality planned by professionals. The current study showed that QFD is an efficient tool for quality planning in public health services.
Planning Tool for Strategic Evaluation of Facility Plans - 13570
DOE Office of Scientific and Technical Information (OSTI.GOV)
Magoulas, Virginia; Cercy, Michael; Hall, Irin
2013-07-01
Savannah River National Laboratory (SRNL) has developed a strategic planning tool for the evaluation of the utilization of its unique resources for processing and research and development of nuclear materials. The Planning Tool is a strategic level tool for assessing multiple missions that could be conducted utilizing the SRNL facilities and showcasing the plan. Traditional approaches using standard scheduling tools and laying out a strategy on paper tended to be labor intensive and offered either a limited or cluttered view for visualizing and communicating results. A tool that can assess the process throughput, duration, and utilization of the facility wasmore » needed. SRNL teamed with Newport News Shipbuilding (NNS), a division of Huntington Ingalls Industries, to create the next generation Planning Tool. The goal of this collaboration was to create a simulation based tool that allows for quick evaluation of strategies with respect to new or changing missions, and clearly communicates results to the decision makers. This tool has been built upon a mature modeling and simulation software previously developed by NNS. The Planning Tool provides a forum for capturing dependencies, constraints, activity flows, and variable factors. It is also a platform for quickly evaluating multiple mission scenarios, dynamically adding/updating scenarios, generating multiple views for evaluating/communicating results, and understanding where there are areas of risks and opportunities with respect to capacity. The Planning Tool that has been developed is useful in that it presents a clear visual plan for the missions at the Savannah River Site (SRS). It not only assists in communicating the plans to SRS corporate management, but also allows the area stakeholders a visual look at the future plans for SRS. The design of this tool makes it easily deployable to other facility and mission planning endeavors. (authors)« less
Meyer, Adrian; Green, Laura; Faulk, Ciearro; Galla, Stephen; Meyer, Anne-Marie
2016-01-01
Introduction: Large amounts of health data generated by a wide range of health care applications across a variety of systems have the potential to offer valuable insight into populations and health care systems, but robust and secure computing and analytic systems are required to leverage this information. Framework: We discuss our experiences deploying a Secure Data Analysis Platform (SeDAP), and provide a framework to plan, build and deploy a virtual desktop infrastructure (VDI) to enable innovation, collaboration and operate within academic funding structures. It outlines 6 core components: Security, Ease of Access, Performance, Cost, Tools, and Training. Conclusion: A platform like SeDAP is not simply successful through technical excellence and performance. It’s adoption is dependent on a collaborative environment where researchers and users plan and evaluate the requirements of all aspects. PMID:27683665
Military deployment toxicology: a program manager's perspective.
Knechtges, P L
2000-02-01
The Persian Gulf War drew attention to the potential hazards of chemicals that personnel may encounter during military operations and deployments overseas. During the War, the oil well fires of Kuwait highlighted the military threat of industrial chemicals in the area of operations. Following the War, the occurrence of Gulf War Illnesses brought home concerns and suspicions regarding "low level" and "mixed" exposures to chemicals. The public's concern and attention resulted in numerous institutional responses to the real and perceived problems of health risks during military deployments. These institutional responses ranged in scope from a Presidential Review Directive to the initiative known as the Deployment Toxicology Research, Development, Testing and Evaluation (RDT&E) Program. Most institutions, however, seem to agree that additional research is needed to assess the health risks from chemical exposures during military deployments. Establishing and managing an effective RDT&E program in risk assessment for deployed forces is a challenging enterprise. The Deployment Toxicology RDT&E Program was conceived utilizing the military's acquisition framework, an effective methodology with a proven record of fielding of new technologies. Based on a series of structured meetings with military representatives that would utilize new risk assessment tools, a hierarchical set of plans was developed to identify and prioritize end products. The challenge ahead for the Deployment Toxicology RDT&E Program is to execute these plans, provide the necessary oversight, and transition the results into successful product development.
Development of the joint munitions planning system - a planning tool for the ammunition community.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hummel, J. R.; Winiecki, A. L.; Fowler, R. S.
2004-10-01
The United States Army Joint Munitions Command (JMC) is the executive agent for the Single Manager for Conventional Ammunition (SMCA). As such the JMC is responsible for the storage and transportation of all Service's SMCA as well as non-SMCA munitions. Part of the JMC mission requires that complex depot capacity studies, transportation capabilities analyses, peacetime re-allocations/ redistribution plans and time-phased deployment distribution plans be developed. Beginning in 1999 the Joint Munitions Planning System (JMPS) was developed to provide sourcing and movement solutions of ammunition for military planners.
Net-Centric Sensors and Data Sources (N-CSDS) GEODSS Sidecar
NASA Astrophysics Data System (ADS)
Richmond, D.
2012-09-01
Vast amounts of Space Situational Sensor data is collected each day on closed, legacy systems. Massachusetts Institute of Technology Lincoln Laboratory (MIT/LL) developed a Net-Centric approach to expose this data under the Extended Space Sensors Architecture (ESSA) Advanced Concept Technology Demonstration (ACTD). The Net-Centric Sensors and Data Sources (N-CSDS) Ground-based Electro Optical Deep Space Surveillance (GEODSS) Sidecar is the next generation that moves the ESSA ACTD engineering tools to an operational baseline. The N-CSDS GEODSS sidecar high level architecture will be presented, highlighting the features that supports deployment at multiple diverse sensor sites. Other key items that will be covered include: 1) The Web Browser interface to perform searches of historical data 2) The capabilities of the deployed Web Services and example service request/responses 3) Example data and potential user applications will be highlighted 4) Specifics regarding the process to gain access to the N-CSDS GEODSS sensor data in near real time 5) Current status and future deployment plans (Including plans for deployment to the Maui GEODSS Site)
TH-D-BRB-04: Pinnacle Scripting: Improving Efficiency While Maintaining Safety
DOE Office of Scientific and Technical Information (OSTI.GOV)
Moore, J.
2016-06-15
Scripting capabilities and application programming interfaces (APIs) are becoming commonly available in modern treatment planning systems. These links to the treatment planning system (TPS) allow users to read data from the TPS, and in some cases use TPS functionality and write data back to the TPS. Such tools are powerful extensions, allowing automation of routine clinical tasks and supporting research, particularly research involving repetitive tasks on large patient populations. The data and functionality exposed by scripting/API capabilities is vendor dependent, as are the languages used by script/API engines, such as the Microsoft .NET framework or Python. Scripts deployed in amore » clinical environment must be commissioned and validated like any other software tool. This session will provide an overview of scripting applications and a discussion of best practices, followed by a practical introduction to the scripting capabilities of three commercial treatment planning systems. Learning Objectives: Understand the scripting capabilities available in several treatment planning systems Learn how to get started using scripting capabilities Understand the best practices for safe script deployment in a clinical environment R. Popple, Varian Medical Systems has provided research support unrelated to the topic of this session.R. Cardan, Varian Medical Systems for grant research, product evaluation, and teaching honorarium.« less
Chaplin, E; Bailey, M; Crosby, R; Gorman, D; Holland, X; Hippe, C; Hoff, T; Nawrocki, D; Pichette, S; Thota, N
1999-06-01
Health care has a number of historical barriers to capturing the voice of the customer and to incorporating customer wants into health care services, whether the customer is a patient, an insurer, or a community. Quality function deployment (QFD) is a set of tools and practices that can help overcome these barriers to form a process for the planning and design or redesign of products and services. The goal of the project was to increase referral volume and to improve a rehabilitation hospital's capacity to provide comprehensive medical and/or legal evaluations for people with complex and catastrophic injuries or illnesses. HIGH-LEVEL VIEW OF QFD AS A PROCESS: The steps in QFD are as follows: capture of the voice of the customer, quality deployment, functions deployment, failure mode deployment, new process deployment, and task deployment. The output of each step becomes the input to a matrix tool or table of the next step of the process. In 3 1/2 months a nine-person project team at Continental Rehabilitation Hospital (San Diego) used QFD tools to capture the voice of the customer, use these data as the basis for a questionnaire on important qualities of service from the customer's perspective, obtain competitive data on how the organization was perceived to be meeting the demanded qualities, identify measurable dimensions and targets of these qualities, and incorporate the functions and tasks into the delivery of service which are necessary to meet the demanded qualities. The future of providing health care services will belong to organizations that can adapt to a rapidly changing environment and to demands for new products and services that are produced and delivered in new ways.
DOT National Transportation Integrated Search
2017-12-01
Traffic incidents have long been recognized as the main contributor to congestion in highway networks. Thus, contending with non-recurrent congestion has been a priority task for most highway agencies over the past decades. Under most incident scenar...
Mining Deployment Optimization
NASA Astrophysics Data System (ADS)
Čech, Jozef
2016-09-01
The deployment problem, researched primarily in the military sector, is emerging in some other industries, mining included. The principal decision is how to deploy some activities in space and time to achieve desired outcome while complying with certain requirements or limits. Requirements and limits are on the side constraints, while minimizing costs or maximizing some benefits are on the side of objectives. A model with application to mining of polymetallic deposit is presented. To obtain quick and immediate decision solutions for a mining engineer with experimental possibilities is the main intention of a computer-based tool. The task is to determine strategic deployment of mining activities on a deposit, meeting planned output from the mine and at the same time complying with limited reserves and haulage capacities. Priorities and benefits can be formulated by the planner.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Durfee, Justin David; Frazier, Christopher Rawls; Bandlow, Alisa
Sandia National Laboratories (Sandia) is in Phase 3 Sustainment of development of a prototype tool, currently referred to as the Contingency Contractor Optimization Tool - Prototype (CCOTP), under the direction of OSD Program Support. CCOT-P is intended to help provide senior Department of Defense (DoD) leaders with comprehensive insight into the global availability, readiness and capabilities of the Total Force Mix. The CCOT-P will allow senior decision makers to quickly and accurately assess the impacts, risks and mitigating strategies for proposed changes to force/capabilities assignments, apportionments and allocations options, focusing specifically on contingency contractor planning. During Phase 2 of themore » program, conducted during fiscal year 2012, Sandia developed an electronic storyboard prototype of the Contingency Contractor Optimization Tool that can be used for communication with senior decision makers and other Operational Contract Support (OCS) stakeholders. Phase 3 used feedback from demonstrations of the electronic storyboard prototype to develop an engineering prototype for planners to evaluate. Sandia worked with the DoD and Joint Chiefs of Staff strategic planning community to get feedback and input to ensure that the engineering prototype was developed to closely align with future planning needs. The intended deployment environment was also a key consideration as this prototype was developed. Initial release of the engineering prototype was done on servers at Sandia in the middle of Phase 3. In 2013, the tool was installed on a production pilot server managed by the OUSD(AT&L) eBusiness Center. The purpose of this document is to specify the CCOT-P engineering prototype platform requirements as of May 2016. Sandia developed the CCOT-P engineering prototype using common technologies to minimize the likelihood of deployment issues. CCOT-P engineering prototype was architected and designed to be as independent as possible of the major deployment components such as the server hardware, the server operating system, the database, and the web server. This document describes the platform requirements, the architecture, and the implementation details of the CCOT-P engineering prototype.« less
DOT National Transportation Integrated Search
2016-08-04
This document is the Task 7 Application Deployment Plan deliverable for the New York City Connected Vehicle Pilot Deployment. It describes the process that the deployment team will follow to acquire and test the connected vehicle safety applications....
Advanced consequence management program: challenges and recent real-world implementations
NASA Astrophysics Data System (ADS)
Graser, Tom; Barber, K. S.; Williams, Bob; Saghir, Feras; Henry, Kurt A.
2002-08-01
The Enhanced Consequence Management, Planning and Support System (ENCOMPASS) was developed under DARPA's Advanced Consequence Management program to assist decision-makers operating in crisis situations such as terrorist attacks using conventional and unconventional weapons and natural disasters. ENCOMPASS provides the tools for first responders, incident commanders, and officials at all levels to share vital information and consequently, plan and execute a coordinated response to incidents of varying complexity and size. ENCOMPASS offers custom configuration of components with capabilities ranging from map-based situation assessment, situation-based response checklists, casualty tracking, and epidemiological surveillance. Developing and deploying such a comprehensive system posed significant challenges for DARPA program management, due to an inherently complex domain, a broad spectrum of customer sites and skill sets, an often inhospitable runtime environment, demanding development-to-deployment transition requirements, and a technically diverse and geographically distributed development team. This paper introduces ENCOMPASS and explores these challenges, followed by an outline of selected ENCOMPASS deployments, demonstrating how ENCOMPASS can enhance consequence management in a variety real world contexts.
The Role of Structural Models in the Solar Sail Flight Validation Process
NASA Technical Reports Server (NTRS)
Johnston, John D.
2004-01-01
NASA is currently soliciting proposals via the New Millennium Program ST-9 opportunity for a potential Solar Sail Flight Validation (SSFV) experiment to develop and operate in space a deployable solar sail that can be steered and provides measurable acceleration. The approach planned for this experiment is to test and validate models and processes for solar sail design, fabrication, deployment, and flight. These models and processes would then be used to design, fabricate, and operate scaleable solar sails for future space science missions. There are six validation objectives planned for the ST9 SSFV experiment: 1) Validate solar sail design tools and fabrication methods; 2) Validate controlled deployment; 3) Validate in space structural characteristics (focus of poster); 4) Validate solar sail attitude control; 5) Validate solar sail thrust performance; 6) Characterize the sail's electromagnetic interaction with the space environment. This poster presents a top-level assessment of the role of structural models in the validation process for in-space structural characteristics.
DOT National Transportation Integrated Search
1995-12-15
THE OBJECTIVE OF THE OMAHA INTELLIGENT TRANSPORTATION (ITS) EARLY DEPLOYMENT STUDY IS TO DEVELOP A STRATEGIC PLAN FOR THE DEPLOYMENT OF ITS TECHNOLOGIES IN THE OMAHA METROPOLITAN AREA. THE PLAN WILL IDENTIFY THE ITS USER SERVICES THAT WILL BE MOST BE...
2D wireless sensor network deployment based on Centroidal Voronoi Tessellation
NASA Astrophysics Data System (ADS)
Iliodromitis, Athanasios; Pantazis, George; Vescoukis, Vasileios
2017-06-01
In recent years, Wireless Sensor Networks (WSNs) have rapidly evolved and now comprise a powerful tool in monitoring and observation of the natural environment, among other fields. The use of WSNs is critical in early warning systems, which are of high importance today. In fact, WSNs are adopted more and more in various applications, e.g. for fire or deformation detection. The optimum deployment of sensors is a multi-dimensional problem, which has two main components; network and positioning approach. Although lots of work has dealt with the issue, most of it emphasizes on mere network approach (communication, energy consumption) and not on the topography (positioning) of the sensors in achieving ideal geometry. In some cases, it is hard or even impossible to achieve perfect geometry in nodes' deployment. The ideal and desirable scenario of nodes arranged in square or hexagonal grid would raise extremely the cost of the network, especially in unfriendly or hostile environments. In such environments the positions of the sensors have to be chosen among a list of possible points, which in most cases are randomly distributed. This constraint has to be taken under consideration during the WSN planning. Full geographical coverage is in some applications of the same, if not of greater, importance than the network coverage. Cost is a crucial factor at network planning and given that resources are often limited, what matters, is to cover the whole area with the minimum number of sensors. This paper suggests a deployment method for nodes, in large scale and high density WSNs, based on Centroidal Voronoi Tessellation (CVT). It approximates the solution through the geometry of the random points and proposes a deployment plan, for the given characteristics of the study area, in order to achieve a deployment as near as possible to the ideal one.
Migrating the Belle II collaborative services and tools
NASA Astrophysics Data System (ADS)
Braun, N.; Dossett, D.; Dramburg, M.; Frost, O.; Gellrich, A.; Grygier, J.; Hauth, T.; Jahnke-Zumbusch, D.; Knittel, D.; Kuhr, T.; Levonian, S.; Moser, H.-G.; Li, L.; Nakao, N.; Prim, M.; Reest, P. v. d.; Schwenssen, F.; Urquijo, P.; Vennemann, B.
2017-10-01
The Belle II collaboration decided in 2016 to migrate its collaborative services and tools into the existing IT infrastructure at DESY. The goal was to reduce the maintenance effort for solutions operated by Belle II members as well as to deploy state-of-art technologies. In addition, some new services and tools were or will be introduced. Planning and migration work was carried out by small teams consisting of experts form Belle II and the involved IT divisions. The migration was successfully accomplished before the KEK computer centre replacement in August 2016.
Connected vehicle pilot deployment program phase 1, deployment outreach plan -- New York City.
DOT National Transportation Integrated Search
2016-07-19
This document is a high level plan that describes the Outreach Plan for the New York City Connected Vehicle Pilot Deployment. The plan defines the communications strategy for the CV Pilot Deployment; identifies roles and responsibilities of persons t...
DOT National Transportation Integrated Search
1998-01-01
The purpose of the ITS Planning Handbook is to provide a tool to assist in meeting current challenges. Specifically, the purposes of the Handbook are to: (1) Identify and describe ways that ITS should be integrated with the mainstream transportation ...
System Architecture Modeling for Technology Portfolio Management using ATLAS
NASA Technical Reports Server (NTRS)
Thompson, Robert W.; O'Neil, Daniel A.
2006-01-01
Strategic planners and technology portfolio managers have traditionally relied on consensus-based tools, such as Analytical Hierarchy Process (AHP) and Quality Function Deployment (QFD) in planning the funding of technology development. While useful to a certain extent, these tools are limited in the ability to fully quantify the impact of a technology choice on system mass, system reliability, project schedule, and lifecycle cost. The Advanced Technology Lifecycle Analysis System (ATLAS) aims to provide strategic planners a decision support tool for analyzing technology selections within a Space Exploration Architecture (SEA). Using ATLAS, strategic planners can select physics-based system models from a library, configure the systems with technologies and performance parameters, and plan the deployment of a SEA. Key parameters for current and future technologies have been collected from subject-matter experts and other documented sources in the Technology Tool Box (TTB). ATLAS can be used to compare the technical feasibility and economic viability of a set of technology choices for one SEA, and compare it against another set of technology choices or another SEA. System architecture modeling in ATLAS is a multi-step process. First, the modeler defines the system level requirements. Second, the modeler identifies technologies of interest whose impact on an SEA. Third, the system modeling team creates models of architecture elements (e.g. launch vehicles, in-space transfer vehicles, crew vehicles) if they are not already in the model library. Finally, the architecture modeler develops a script for the ATLAS tool to run, and the results for comparison are generated.
Enhanced Logistics Intra-theater Support Tool
DOE Office of Scientific and Technical Information (OSTI.GOV)
Van Groningen, Charles N.; Braun, Mary Duffy; Widing, Mary Ann
2004-01-27
Developed for use by Department of Defense deployment analysts to perform detailed Reception, Staging, Onward movement and Integration (RSO&I) analyses. ELIST requires: o Vehicle characteristics for ships, planes, trucks, railcars, buses, and helicopters. o Network (physical) characteristics defining the airport, seaport, road, rail, waterway and pipeline infrastructure available in a theater of operations. o Assets available for moving the personnel, equipment and supplies over the infrastructure network. o Movement requirements plan defining the deployment requirements of a military force. This includes defining each unit, its cargo (at various levels of resolution) , where it must move from and to, whatmore » modes it is required to travel by, and when it must be delivered through each phase of deployment.« less
Flabouris, Arthas; Nocera, Antony; Garner, Alan
2004-01-01
Multiple casualty incidents (MCI) are infrequent events for medical systems. This renders audit and quality improvement of the medical responses difficult. Quality tools and use of such tools for improvement is necessary to ensure that the design of medical systems facilitates the best possible response to MCI. To describe the utility of incident reporting as a quality monitoring and improvement tool during the deployment of medical teams for mass gatherings and multiple casualty incidents. Voluntary and confidential reporting of incidents was provided by members of the disaster medical response teams during the period of disaster medical team deployment for the 2000 Sydney Olympic Games. Qualitative evaluations were conducted of reported incidents. The main outcome measures included the nature of incident and associated contributing factors, minimization factors, harm potential, and comparison with the post-deployment, cold debriefings. A total of 53 incidents were reported. Management-based decisions, poor or non-existent protocols, and equipment and communication-related issues were the principal contributing factors. Eighty nine percent of the incidents were considered preventable. A potential for harm to patients and/or team members was documented in 58% of reports, of which 76% were likely to cause at least significant harm. Of equipment incidents, personal protective equipment (33%), medical equipment (27%), provision of equipment (22%), and communication equipment (17%) predominated. Personal protective equipment (50%) was reported as the most frequent occupational health and safety incident followed by fatigue (25%). Pre-deployment planning was the most important factor for future incident impact minimization. Incident monitoring was efficacious as a quality tool in identifying incident contributing factors. Incident monitoring allowed for greater systems evaluation. Further evaluation of this quality tool within different disaster settings is required.
The USAID-NREL Partnership: Delivering Clean, Reliable, and Affordable Power in the Developing World
DOE Office of Scientific and Technical Information (OSTI.GOV)
Watson, Andrea C; Leisch, Jennifer E
The U.S. Agency for International Development (USAID) and the National Renewable Energy Laboratory (NREL) are partnering to support clean, reliable, and affordable power in the developing world. The USAID-NREL Partnership helps countries with policy, planning, and deployment support for advanced energy technologies. Through this collaboration, USAID is accessing advanced energy expertise and analysis pioneered by the U.S. National Laboratory system. The Partnership addresses critical aspects of advanced energy systems including renewable energy deployment, grid modernization, distributed energy resources and storage, power sector resilience, and the data and analytical tools needed to support them.
Taking it to the streets: delivering on deployment.
Carr, Dafna; Welch, Vickie; Fabik, Trish; Hirji, Nadir; O'Connor, Casey
2009-01-01
From inception to deployment, the Wait Time Information System (WTIS) project faced significant challenges associated with time, scope and complexity. It involved not only the creation and deployment of two large-scale province-wide systems (the WTIS and Ontario's Client Registry/Enterprise Master Patient Index) within aggressive time frames, but also the active engagement of 82 Ontario hospitals, scores of healthcare leaders and several thousand clinicians who would eventually be using the new technology and its data. The provincial WTIS project team (see Figure 1) also had to be able to adapt and evolve their planning in an environment that was changing day-by-day. This article looks at the factors that allowed the team to take the WTIS out to the field and shares the approach, processes and tools used to deploy this complex and ambitious information management and information technology (IM/IT) initiative.
ERIC Educational Resources Information Center
Glander-Dolo, S. Mackenzie
2010-01-01
This case study of Malian technology implementation questions the historic patron-client approach of international development planning and deployment of aid and assistance to least developed countries while addressing the added challenges that globalization brings. Using a systems lens and analogy, a conceptual model is built from a literature…
Hoshin Kanri: a technique for strategic quality management.
Tennant, C; Roberts, P A
2000-01-01
This paper describes a technique for Strategic Quality Management (SQM), known as Hoshin Kanri, which has been operated as a management system in many Japanese companies since the 1960s. It represents a core aspect of Japanese companies' management systems, and is stated as: the means by which the overall control system and Total Quality Management (TQM) are deployed. Hoshin Kanri is not particularly unique in its concept of establishing and tracking individual goals and objectives, but the manner in which the objectives and the means to achieve them are developed and deployed is. The problem with applying the concept of Strategic Quality Management (SQM) using Hoshin Kanri, is that it can tend to challenge the traditional authoritarian strategic planning models, which have become the paradigms of modern business. Yet Hoshin Kanri provides an appropriate tool for declaration of the strategic vision for the business while integrating goals and targets in a single holistic model. There have been various adaptations of Hoshin Kanri to align the technique to Western thinking and management approaches, yet outside Japan its significance has gone largely unreported. It is proposed that Hoshin Kanri is an effective methodology for SQM, which has a number of benefits over the more conventional planning techniques. The benefits of Hoshin Kanri as a tool for Strategic Quality Management (SQM) compared to conventional planning systems include: integration of strategic objectives with tactical daily management, the application of the plan-do-check-act cycle to business process management, parallel planning and execution methodology, company wide approach, improvements in communication, increased consensus and buy-in to goal setting, and cross-functional-management integration.
Revel8or: Model Driven Capacity Planning Tool Suite
DOE Office of Scientific and Technical Information (OSTI.GOV)
Zhu, Liming; Liu, Yan; Bui, Ngoc B.
2007-05-31
Designing complex multi-tier applications that must meet strict performance requirements is a challenging software engineering problem. Ideally, the application architect could derive accurate performance predictions early in the project life-cycle, leveraging initial application design-level models and a description of the target software and hardware platforms. To this end, we have developed a capacity planning tool suite for component-based applications, called Revel8tor. The tool adheres to the model driven development paradigm and supports benchmarking and performance prediction for J2EE, .Net and Web services platforms. The suite is composed of three different tools: MDAPerf, MDABench and DSLBench. MDAPerf allows annotation of designmore » diagrams and derives performance analysis models. MDABench allows a customized benchmark application to be modeled in the UML 2.0 Testing Profile and automatically generates a deployable application, with measurement automatically conducted. DSLBench allows the same benchmark modeling and generation to be conducted using a simple performance engineering Domain Specific Language (DSL) in Microsoft Visual Studio. DSLBench integrates with Visual Studio and reuses its load testing infrastructure. Together, the tool suite can assist capacity planning across platforms in an automated fashion.« less
DOT National Transportation Integrated Search
2016-08-01
This document describes the Deployment Plan for the New York City Department of Transportation (NYC) Connected Vehicle Pilot Deployment (CVPD) Project. This plan describes the approach to complete Phase 2 Design/Build/Test, and Phase 3 Operate and Ma...
ITS strategic deployment plan : executive summary
DOT National Transportation Integrated Search
1997-02-27
The Salt Lake Valley ITS Early Deployment Planning Study-Phase II prepared the framework to deploy candidate Intelligent Transportation System (ITS) projects that address Salt Lake Valleys transportation needs. A planning process was used that inc...
The Future of Additive Manufacturing in Air Force Acquisition
2017-03-22
manufacturing data - Designing and deploying a virtual aircraft fleet for future conflict - Space-based satellite production for defense capabilities via...changing system design via lower production costs, enhanced performance possibilities, and rapid replenishment. In the Technology Maturation and Risk... manufacturing as well as major cost savings via reduction of required materials, unique tooling, specialized production plans, and segments of the
Phasor Simulator for Operator Training Project
DOE Office of Scientific and Technical Information (OSTI.GOV)
Dyer, Jim
2016-09-14
Synchrophasor systems are being deployed in power systems throughout the North American Power Grid and there are plans to integrate this technology and its associated tools into Independent System Operator (ISO)/utility control room operations. A pre-requisite to using synchrophasor technologies in control rooms is for operators to obtain training and understand how to use this technology in real-time situations. The Phasor Simulator for Operator Training (PSOT) project objective was to develop, deploy and demonstrate a pre-commercial training simulator for operators on the use of this technology and to promote acceptance of the technology in utility and ISO/Regional Transmission Owner (RTO)more » control centers.« less
Repair of major system elements on Skylab
NASA Technical Reports Server (NTRS)
Pace, R. E., Jr.
1975-01-01
In-flight maintenance, as conceived and pre-planned for the Skylab Mission, was limited to simple scheduled and unscheduled replacement tasks and minor contingency repairs. Failures during the mission dictated complicated and sophisticated repairs to major systems so that the mission could continue. These repairs include the release of a large structure that failed to deploy, the assembly and deployment of large mechanical devices, the installation and checkout of precision electronic equipment, troubleshooting and repair of precision electromechanical equipment and tapping into and recharging a cooling system. The Skylab experience proves conclusively that crewmen can, with adequate training, make major system repairs in space using standard or special tools.
Garden State Parkway Corridor : ITS early deployment planning study : strategic deployment plan
DOT National Transportation Integrated Search
1997-12-01
This Strategic Deployment Plan describes ways of improving travel within the Garden : State Parkway Corridor using intelligent transportation systems (ITS) and without : constructing additional roadway lanes. Travel improvements will be possible with...
Miami Valley ITS : early deployment plan : final ITS strategic deployment plan
DOT National Transportation Integrated Search
1997-09-01
This report presents the Strategic Deployment Plan for Intelligent Transportation Systems (ITS) in Clark, Greene, Miami and Montgomery Counties, Ohio (the Miami Valley). The report summarizes the steps that were performed in preparing the Strat...
NYC CV Pilot Deployment : Safety Management Plan : New York City.
DOT National Transportation Integrated Search
2016-04-22
This safety management plan identifies preliminary safety hazards associated with the New York City Connected Vehicle Pilot Deployment project. Each of the hazards is rated, and a plan for managing the risks through detailed design and deployment is ...
Implementing Earned Value Management in the CxP EVA Systems Project Office
NASA Technical Reports Server (NTRS)
Sorge, Les L.
2009-01-01
Earned Value Management (EVM), like project management, is as much art as it is science to develop an implementation plan for a project. This presentation will cover issues that were overcome and the implementation strategy to deploy Earned Value Management (EVM) within the Constellation Program (CxP), EVA Systems Project Office (ESPO), as well as discuss additional hurdles that currently prevent the organization from optimizing EVM. Each organization and each project within an organization needs to mold an EVM implementation plan around existing processes and tools, while at the same time revising those existing processes and tools as necessary to make them compatible with EVM. The ESPO EVM implementation covers work breakdown structure, organizational breakdown structure, control account, work/planning package development; integrated master schedule development using an integrated master plan; incorporating reporting requirements for existing funding process such as Planning, Programming, Budgeting, and Execution (PPBE) and JSC Internal Task Agreements (ITA); and interfacing with other software tools such as the Systems Applications and Products (SAP) accounting system and the CxP wInsight EVM analysis tool. However, there are always areas for improvement and EVM is no exception. As EVM continues to mature within the NASA CxP, these areas will continue to be worked to resolution to provide the Program Managers, Project Managers, and Control Account Managers the best EVM data possible to make informed decisions.
Interagency Task Forces: The Right Tools for the Job
2011-01-01
shortcomings. This analysis discusses four organizational reform models and recommends the interagency task force ( IATF ) as the preferred structure...model.64 Still others recommend creating and deploying ad hoc IATFs for crisis operations. These interagency task forces would be task- organized to...forces assigned for planning, exercises, and mission execution.65 A 2005 article in Policy Review recommended developing IATFs as needed for specific
2013-03-01
planning tools, expeditionary airbase location optimization, knowledge transfer at deployment rotation turnover, exercises and evaluations, and others...laying airfield matting Constructing earth berms and dikes for fuel bladders or unsheltered aircraft Modifying existing facilities for alternate...Providing all essential utilities Constructing earth berms and access roads for bomb dumps Constructing communication tower foundations
NASA Astrophysics Data System (ADS)
Arevalo, S.; Atwood, C.; Bell, P.; Blacker, T. D.; Dey, S.; Fisher, D.; Fisher, D. A.; Genalis, P.; Gorski, J.; Harris, A.; Hill, K.; Hurwitz, M.; Kendall, R. P.; Meakin, R. L.; Morton, S.; Moyer, E. T.; Post, D. E.; Strawn, R.; Veldhuizen, D. v.; Votta, L. G.; Wynn, S.; Zelinski, G.
2008-07-01
In FY2008, the U.S. Department of Defense (DoD) initiated the Computational Research and Engineering Acquisition Tools and Environments (CREATE) program, a 360M program with a two-year planning phase and a ten-year execution phase. CREATE will develop and deploy three computational engineering tool sets for DoD acquisition programs to use to design aircraft, ships and radio-frequency antennas. The planning and execution of CREATE are based on the 'lessons learned' from case studies of large-scale computational science and engineering projects. The case studies stress the importance of a stable, close-knit development team; a focus on customer needs and requirements; verification and validation; flexible and agile planning, management, and development processes; risk management; realistic schedules and resource levels; balanced short- and long-term goals and deliverables; and stable, long-term support by the program sponsor. Since it began in FY2008, the CREATE program has built a team and project structure, developed requirements and begun validating them, identified candidate products, established initial connections with the acquisition programs, begun detailed project planning and development, and generated the initial collaboration infrastructure necessary for success by its multi-institutional, multidisciplinary teams.
Overview of Hazard Assessment and Emergency Planning Software of Use to RN First Responders
DOE Office of Scientific and Technical Information (OSTI.GOV)
Waller, E; Millage, K; Blakely, W F
2008-08-26
There are numerous software tools available for field deployment, reach-back, training and planning use in the event of a radiological or nuclear (RN) terrorist event. Specialized software tools used by CBRNe responders can increase information available and the speed and accuracy of the response, thereby ensuring that radiation doses to responders, receivers, and the general public are kept as low as reasonably achievable. Software designed to provide health care providers with assistance in selecting appropriate countermeasures or therapeutic interventions in a timely fashion can improve the potential for positive patient outcome. This paper reviews various software applications of relevance tomore » radiological and nuclear (RN) events that are currently in use by first responders, emergency planners, medical receivers, and criminal investigators.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Seimenis, Ioannis; Tsekos, Nikolaos V.; Keroglou, Christoforos
2012-04-15
Purpose: The aim of this work was to develop and test a general methodology for the planning and performance of robot-assisted, MR-guided interventions. This methodology also includes the employment of software tools with appropriately tailored routines to effectively exploit the capabilities of MRI and address the relevant spatial limitations. Methods: The described methodology consists of: (1) patient-customized feasibility study that focuses on the geometric limitations imposed by the gantry, the robotic hardware, and interventional tools, as well as the patient; (2) stereotactic preoperative planning for initial positioning of the manipulator and alignment of its end-effector with a selected target; andmore » (3) real-time, intraoperative tool tracking and monitoring of the actual intervention execution. Testing was performed inside a standard 1.5T MRI scanner in which the MR-compatible manipulator is deployed to provide the required access. Results: A volunteer imaging study demonstrates the application of the feasibility stage. A phantom study on needle targeting is also presented, demonstrating the applicability and effectiveness of the proposed preoperative and intraoperative stages of the methodology. For this purpose, a manually actuated, MR-compatible robotic manipulation system was used to accurately acquire a prescribed target through alternative approaching paths. Conclusions: The methodology presented and experimentally examined allows the effective performance of MR-guided interventions. It is suitable for, but not restricted to, needle-targeting applications assisted by a robotic manipulation system, which can be deployed inside a cylindrical scanner to provide the required access to the patient facilitating real-time guidance and monitoring.« less
NASA Astrophysics Data System (ADS)
Valent, Philip J.; Riggins, Michael
1989-04-01
An overview is given of current and developing technologies and techniques for performing geotechnical investigations for siting and designing Cold Water Pipes (CWP) for shelf-resting Ocean Thermal Energy Conversion (OTEC) power plants. The geotechnical in situ tools used to measure the required parameters and the equipment/systems used to deploy these tools are identified. The capabilities of these geotechnical tools and deployment systems are compared to the data requirements for the CWP foundation/anchor design, and shortfalls are identified. For the last phase of geotechnical data gathering for design, a drillship will be required to perform soil boring work, to obtain required high quality sediment samples for laboratory dynamic testing, and to perform deep penetration in situ tests. To remedy shortfalls and to reduce the future OTEC CWP geotechnical survey costs, it is recommended that a seafloor resting machine be developed to advance the friction cone penetrometer, and also probably a pressuremeter, to provide geotechnical parameters to shallow subseafloor penetrations on slopes of 35 deg and in water depths to 1300 m.
DOT National Transportation Integrated Search
2016-11-01
Post-Deployment Analysis, Modeling, and Simulation (AMS) activities focus on identifying impacts and benefits of the as-deployed Integrated Corridor Management (ICM) system. The as-deployed ICM strategies may differ from as-planned ...
DOT National Transportation Integrated Search
2016-10-01
Post-Deployment Analysis, Modeling, and Simulation (AMS) activities focus on identifying impacts and benefits of the as-deployed Integrated Corridor Management (ICM) system. The as-deployed ICM strategies may differ from as-planned ...
Planning Multitechnology Access Networks with Performance Constraints
NASA Astrophysics Data System (ADS)
Chamberland, Steven
Considering the number of access network technologies and the investment needed for the “last mile” of a solution, in today’s highly competitive markets, planning tools are crucial for the service providers to optimize the network costs and accelerate the planning process. In this paper, we propose to tackle the problem of planning access networks composed of four technologies/architectures: the digital subscriber line (xDSL) technologies deployed directly from the central office (CO), the fiber-to-the-node (FTTN), the fiber-to-the-micro-node (FTTn) and the fiber-to-the-premises (FTTP). A mathematical programming model is proposed for this planning problem that is solved using a commercial implementation of the branch-and-bound algorithm. Next, a detailed access network planning example is presented followed by a systematic set of experiments designed to assess the performance of the proposed approach.
Toward the Design of Personalized Continuum Surgical Robots.
Morimoto, Tania K; Greer, Joseph D; Hawkes, Elliot W; Hsieh, Michael H; Okamura, Allison M
2018-05-31
Robot-assisted minimally invasive surgical systems enable procedures with reduced pain, recovery time, and scarring compared to traditional surgery. While these improvements benefit a large number of patients, safe access to diseased sites is not always possible for specialized patient groups, including pediatric patients, due to their anatomical differences. We propose a patient-specific design paradigm that leverages the surgeon's expertise to design and fabricate robots based on preoperative medical images. The components of the patient-specific robot design process are a virtual reality design interface enabling the surgeon to design patient-specific tools, 3-D printing of these tools with a biodegradable polyester, and an actuation and control system for deployment. The designed robot is a concentric tube robot, a type of continuum robot constructed from precurved, elastic, nesting tubes. We demonstrate the overall patient-specific design workflow, from preoperative images to physical implementation, for an example clinical scenario: nonlinear renal access to a pediatric kidney. We also measure the system's behavior as it is deployed through real and artificial tissue. System integration and successful benchtop experiments in ex vivo liver and in a phantom patient model demonstrate the feasibility of using a patient-specific design workflow to plan, fabricate, and deploy personalized, flexible continuum robots.
Sci-Thur PM – Colourful Interactions: Highlights 05: Opal–the Oncology Patient Application
DOE Office of Scientific and Technical Information (OSTI.GOV)
Joseph, Ackeem; Herrera, David; Kildea, John
We describe Opal (Oncology portal and application), the mobile phone app and patient portal that we have developed and are deploying for Radiation Oncology patients at our cancer centre. Opal is a novel tool to empower patients with their own personal medical data, including appointment schedules, consultation notes, test results, radiotherapy treatment planning information and wait time management. Furthermore, due to its integration with our electronic medical record and treatment planning database, Opal will allow us to collect patient reported outcomes from consenting patients and link them directly with dose volume histograms and other treatment data.
Miami Valley ITS : early deployment plan : final user service plan
DOT National Transportation Integrated Search
1997-07-01
This User Service Plan is the first major product of the process to develop an Intelligent Transportation System (ITS) Early Deployment Plan (EDP) for the Miami Valley. This User Service Plan documents the travel environment, growth trends and transp...
Multi-Metric Sustainability Analysis
DOE Office of Scientific and Technical Information (OSTI.GOV)
Cowlin, Shannon; Heimiller, Donna; Macknick, Jordan
2014-12-01
A readily accessible framework that allows for evaluating impacts and comparing tradeoffs among factors in energy policy, expansion planning, and investment decision making is lacking. Recognizing this, the Joint Institute for Strategic Energy Analysis (JISEA) funded an exploration of multi-metric sustainability analysis (MMSA) to provide energy decision makers with a means to make more comprehensive comparisons of energy technologies. The resulting MMSA tool lets decision makers simultaneously compare technologies and potential deployment locations.
Deploying the ODIS robot in Iraq and Afghanistan
NASA Astrophysics Data System (ADS)
Smuda, Bill; Schoenherr, Edward; Andrusz, Henry; Gerhart, Grant
2005-05-01
The wars in Iraq and Afghanistan have shown the importance of robotic technology as a force multiplier and a tool for moving soldiers out of harms way. Situations on the ground make soldiers performing checkpoint operations easy targets for snipers and suicide bombers. Robotics technology reduces risk to soldiers and other personnel at checkpoints. Early user involvement in innovative and aggressive development and acquisition strategies are the key to moving robotic and associated technology into the hands of the user. This paper updates activity associated with rapid development of the Omni-Directional Inspection System (ODIS) robot for under vehicle inspection and reports on our field experience with robotics in Iraq and Afghanistan. In February of 2004, two TARDEC Engineers departed for a mission to Iraq and Afghanistan with ten ODIS Robots. Six robots were deployed in the Green Zone in Baghdad. Two Robots were deployed at Kandahar Army Airfield and two were deployed at Bagram Army Airfield in Afghanistan. The TARDEC Engineers who performed this mission trained the soldiers and provided initial on site support. They also trained Exponent employees assigned to the Rapid Equipping Force in ODIS repair. We will discuss our initial deployment, lessons learned and future plans.
Connected Vehicle Pilot Deployment Program Phase 1, Outreach Plan – Tampa (THEA).
DOT National Transportation Integrated Search
2016-07-06
This document presents the Outreach Plan for the Tampa Hillsborough Expressway Authority (THEA) Connected Vehicle (CV) Pilot Deployment. The goal of the pilot deployment is to advance and enable safe, interoperable, networked wireless communications ...
A Modular Approach To Developing A Large Deployable Reflector
NASA Astrophysics Data System (ADS)
Pittman, R.; Leidich, C.; Mascy, F.; Swenson, B.
1984-01-01
NASA is currently studying the feasibility of developing a Large Deployable Reflector (LDR) astronomical facility to perform astrophysical studies of the infrared and submillimeter portion of the spectrum in the mid 1990's. The LDR concept was recommended by the Astronomy Survey Committee of the National Academy of Sciences as one of two space based projects to be started this decade. The current baseline calls for a 20 m (65.6 ft) aperture telescope diffraction limited at 30 μm and automatically deployed from a single Shuttle launch. The volume, performance, and single launch constraints place great demands on the technology and place LDR beyond the state-of-the-art in certain areas such as lightweight reflector segments. The advent of the Shuttle is opening up many new options and capabilities for producing large space systems. Until now, LDR has always been conceived as an integrated system, deployed autonomously in a single launch. This paper will look at a combination of automatic deployment and on-orbit assembly that may reduce the technological complexity and cost of the LDR system. Many technological tools are now in use or under study that will greatly enhance our capabilities to do assembly in space. Two Shuttle volume budget scenarios will be examined to assess the potential of these tools to reduce the LDR system complexity. Further study will be required to reach the full optimal combination of deployment and assembly, since in most cases the capabilities of these new tools have not been demonstrated. In order to take maximum advantage of these concepts, the design of LDR must be flexible and allow one subsystem to be modified without adversely affecting the entire system. One method of achieving this flexibility is to use a modular design approach in which the major subsystems are physically separated during launch and assembled on orbit. A modular design approach facilitates this flexibility but requires that the subsystems be interfaced in a simple, straightforward, and controlled manner. NASA is currently defining a technology development plan for LDR which will identify the technology advances that are required. The modular approach offers the flexibility to easily incorporate these new advances into the design.
Market Transformation | Hydrogen and Fuel Cells | NREL
deployment sites Develop techno-economic assessment tools, deployment tools, and business cases for various fuel cell applications Collect and evaluate data from deployment projects to verify the business cases
Connected vehicle pilot deployment program phase 1, safety management plan – Tampa (THEA).
DOT National Transportation Integrated Search
2016-04-01
This document presents the Safety Management Plan for the THEA Connected Vehicle (CV) Pilot Deployment. The THEA CV Pilot Deployment goal is to advance and enable safe, interoperable, networked wireless communications among vehicles, the infrastructu...
USGS Integration of New Science and Technology, Appendix A
Brey, Marybeth; Knights, Brent C.; Cupp, Aaron R.; Amberg, Jon J.; Chapman, Duane C.; Calfee, Robin D.; Duncker, James J.
2017-01-01
This product summarizes the USGS plans for integration of new science and technology into Asian Carp control efforts for 2017. This includes the 1) implementation and evaluation of new tactics and behavioral information for monitoring, surveillance, control and containment; 2) understanding behavior and reproduction of Asian carp in established and emerging populations to inform deterrent deployment, rapid response, and removal efforts; and 3) development and evaluation of databases, decision support tools and performance measures.
VA/DoD Joint Executive Council FY 2009: Joint Strategic Plan FY 2010-2012
2009-01-01
through the Military Health System (MHS) Population Health Portal . HEC Traumatic Brain Injury and Psychological Health In FY 2009, VA and DoD made...available using the Deployment Occupational and Environmental Health Surveillance Portal . TBI and MH assessment tools were evaluated and monitored through...with increased access, VA maintained the frequency of encounters for treatment of PTSD and other MH conditions in Veterans of prior eras. To forecast
NASA Technical Reports Server (NTRS)
Lee, Katharine K.; Davis, Thomas J.; Levin, Kerry M.; Rowe, Dennis W.
2001-01-01
The Traffic Management Advisor (TMA) is a decision-support tool for traffic managers and air traffic controllers that provides traffic flow visualization and other flow management tools. TMA creates an efficiently sequenced and safely spaced schedule for arrival traffic that meets but does not exceed specified airspace system constraints. TMA is being deployed at selected facilities throughout the National Airspace System in the US as part of the FAA's Free Flight Phase 1 program. TMA development and testing, and its current deployment, focuses on managing the arrival capacity for single major airports within single terminal areas and single en route centers. The next phase of development for this technology is the expansion of the TMA capability to complex facilities in which a terminal area or airport is fed by multiple en route centers, thus creating a multicenter TMA functionality. The focus of the multi-center TMA (McTMA) development is on the busy facilities in the Northeast comdor of the US. This paper describes the planning and development of McTMA and the challenges associated with adapting a successful traffic flow management tool for a very complex airspace.
An Assessment of Integrated Health Management (IHM) Frameworks
DOE Office of Scientific and Technical Information (OSTI.GOV)
N. Lybeck; M. Tawfik; L. Bond
In order to meet the ever increasing demand for energy, the United States nuclear industry is turning to life extension of existing nuclear power plants (NPPs). Economically ensuring the safe, secure, and reliable operation of aging nuclear power plants presents many challenges. The 2009 Light Water Reactor Sustainability Workshop identified online monitoring of active and structural components as essential to the better understanding and management of the challenges posed by aging nuclear power plants. Additionally, there is increasing adoption of condition-based maintenance (CBM) for active components in NPPs. These techniques provide a foundation upon which a variety of advanced onlinemore » surveillance, diagnostic, and prognostic techniques can be deployed to continuously monitor and assess the health of NPP systems and components. The next step in the development of advanced online monitoring is to move beyond CBM to estimating the remaining useful life of active components using prognostic tools. Deployment of prognostic health management (PHM) on the scale of a NPP requires the use of an integrated health management (IHM) framework - a software product (or suite of products) used to manage the necessary elements needed for a complete implementation of online monitoring and prognostics. This paper provides a thoughtful look at the desirable functions and features of IHM architectures. A full PHM system involves several modules, including data acquisition, system modeling, fault detection, fault diagnostics, system prognostics, and advisory generation (operations and maintenance planning). The standards applicable to PHM applications are indentified and summarized. A list of evaluation criteria for PHM software products, developed to ensure scalability of the toolset to an environment with the complexity of a NPP, is presented. Fourteen commercially available PHM software products are identified and classified into four groups: research tools, PHM system development tools, deployable architectures, and peripheral tools.« less
1989-06-01
employees. A policy consists of targets, plans, and target values. Policy Deployment: One English translation for hoshin kanri . (Others are management by...policy and hoshin planning.) Policy deployment orchestrates continuous improvement in a way that fosters individual initiative and alignment. Process
DOT National Transportation Integrated Search
1997-03-01
The goal of this study was to develop a Strategic Plan for deployment of ITS technologies within the Nashville Metro Area and to create a long-term coalition of ITS stakeholders, with the objective of expanding the implementation of ITS technologies ...
2009-09-30
Node deployment. Original plans were to deploy directly to Fort Jefferson on Dry Tortugas (near Key West, FL). Current plans are to initially deploy...to the USCG Station on Ismoralda Key for training operations; then deploy at a to-be- determined date to Fort Jefferson on Dry Tortugas . During FY09...Dry Tortugas . NRL expects to deliver the Ground Node to Ismoralda Key in October 2009. FY09 continued the third year of providing Ground
Austin area-wide IVHS plan and IH-35 corridor deployment plan
DOT National Transportation Integrated Search
1998-02-01
This report describes efforts towards developing an intelligent transportation systems (ITS) deployment plan for the Austin metropolitan area in Texas. ITS issues, strategies, and technologies are discussed. The focus of the study is to support the f...
12 CFR 563b.105 - What information must I include in my business plan?
Code of Federal Regulations, 2010 CFR
2010-01-01
... achieve your planned deployment of conversion proceeds in your proposed market areas, and how your... lending needs in your proposed market areas. OTS strongly discourages business plans that provide for a... properly managed leverage strategy. (3) The risks associated with your plan for deployment of conversion...
USDOT guidance summary for connected vehicle deployments : application deployment.
DOT National Transportation Integrated Search
2016-07-01
This document provides guidance material in regards to the Application Deployment Plan for the CV Pilots DeploymentConcept Development Phase. Methods for application deployment are discussed with definitions for the successfulmanagement of each aspec...
DOT National Transportation Integrated Search
2003-09-22
This document presents the Evaluation Teams plan for conducting the evaluation of the FOT in Washington State. A companion document exists for the evaluation of the Utah deployment. This plan includes the experimental design for testing hypotheses...
Southern California ITS Priority Corridor strategic deployment plan : interim report
DOT National Transportation Integrated Search
1998-08-01
This deployment plan will be the "blueprint" for agencies to follow to ensure that projects are designed and built to conform to the National ITS Architecture and Standards, a requirement for funding under TEA 21. The federal ITS planning and deploym...
Connected Vehicle Pilot Deployment Program Phase 2, Data Management Plan
DOT National Transportation Integrated Search
2017-10-17
This document represents a data management plan that delineates all of the data types and data treatment throughout the New York City Connected Vehicle Pilot Deployment (NYC CVPD). This plan includes an identification of the New York City connected v...
Des Moines metropolitan area ITS strategic plan : executive summary
DOT National Transportation Integrated Search
1997-12-01
This is an executive summary of a strategic plan for deploying Intelligent Transportation Systems (ITS) technology in the Des Moines metropolitan area. The plan was developed as part of the Des Moines ITS Early Deployment Study (EDS). ITS is the use ...
USDOT guidance summary for connected vehicle deployments : deployment outreach.
DOT National Transportation Integrated Search
2016-07-01
This document provides guidance material in regards to the outreach activities in the CV Pilot Deployment ConceptDevelopment Phase and deployment outreach plan in the Deployment Phases. This guidance provides keyrequirements and references in develop...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Blair, Nate; Zhou, Ella; Getman, Dan
2015-10-01
Mathematical and computational models are widely used for the analysis and design of both physical and financial systems. Modeling the electric grid is of particular importance to China for three reasons. First, power-sector assets are expensive and long-lived, and they are critical to any country's development. China's electric load, transmission, and other energy-related infrastructure are expected to continue to grow rapidly; therefore it is crucial to understand and help plan for the future in which those assets will operate (NDRC ERI 2015). Second, China has dramatically increased its deployment of renewable energy (RE), and is likely to continue further acceleratingmore » such deployment over the coming decades. Careful planning and assessment of the various aspects (technical, economic, social, and political) of integrating a large amount of renewables on the grid is required. Third, companies need the tools to develop a strategy for their own involvement in the power market China is now developing, and to enable a possible transition to an efficient and high RE future.« less
The Business Change Initiative: A Novel Approach to Improved Cost and Schedule Management
NASA Technical Reports Server (NTRS)
Shinn, Stephen A.; Bryson, Jonathan; Klein, Gerald; Lunz-Ruark, Val; Majerowicz, Walt; McKeever, J.; Nair, Param
2016-01-01
Goddard Space Flight Center's Flight Projects Directorate employed a Business Change Initiative (BCI) to infuse a series of activities coordinated to drive improved cost and schedule performance across Goddard's missions. This sustaining change framework provides a platform to manage and implement cost and schedule control techniques throughout the project portfolio. The BCI concluded in December 2014, deploying over 100 cost and schedule management changes including best practices, tools, methods, training, and knowledge sharing. The new business approach has driven the portfolio to improved programmatic performance. The last eight launched GSFC missions have optimized cost, schedule, and technical performance on a sustained basis to deliver on time and within budget, returning funds in many cases. While not every future mission will boast such strong performance, improved cost and schedule tools, management practices, and ongoing comprehensive evaluations of program planning and control methods to refine and implement best practices will continue to provide a framework for sustained performance. This paper will describe the tools, techniques, and processes developed during the BCI and the utilization of collaborative content management tools to disseminate project planning and control techniques to ensure continuous collaboration and optimization of cost and schedule management in the future.
GPS test range mission planning
NASA Astrophysics Data System (ADS)
Roberts, Iris P.; Hancock, Thomas P.
The principal features of the Test Range User Mission Planner (TRUMP), a PC-resident tool designed to aid in deploying and utilizing GPS-based test range assets, are reviewed. TRUMP features time history plots of time-space-position information (TSPI); performance based on a dynamic GPS/inertial system simulation; time history plots of TSPI data link connectivity; digital terrain elevation data maps with user-defined cultural features; and two-dimensional coverage plots of ground-based test range assets. Some functions to be added during the next development phase are discussed.
Evidence that implementation intentions can overcome the effects of smoking habits.
Armitage, Christopher J
2016-09-01
In this study, the aim was to (a) test for the first time whether implementation intentions formed outside the laboratory can overcome the effects of habits, and (b) see whether the operation of implementation intentions could be improved by asking people to form certain "when-then" plans as opposed to uncertain "if-then" plans. The study employed a 2 × 2 fully factorial design with baseline and follow-up measures of smoking status and habits. Smokers (N = 168; circa 33 years of age; 79 women, 89 men) were randomly allocated to 1 of 2 intervention groups to form either if-then plans or when-then plans using supporting tools, or to 1 of 2 control conditions in which they were exposed to identical supporting tools but were not asked to form if-then plans or when-then plans. Certainty did not affect the operation of implementation intentions, but smokers who formed implementation intentions were significantly more likely to quit, χ2(1, N = 168) = 8.86, p < .01, and the effect was mediated by changes in smoking habits (95% CI [0.02, 0.14]). Similar effects were observed when cigarettes smoked per day, nicotine dependence, and craving served as the dependent variables. The findings demonstrate that people who have formed implementation intentions can overcome habits, such as smoking, outside the laboratory. The supporting tools described in the present research could be deployed at low cost with high public health reach to support behavior change. (PsycINFO Database Record (c) 2016 APA, all rights reserved).
Photograph of Apollo 17 Lunar Roving Vehicle traverses
1972-10-01
S72-03145 (October 1972) --- A vertical view of the Apollo 17 Taurus-Littrow site with an overlay to illustrate the three planned Apollo 17 traverses using the Lunar Roving Vehicle (LRV). The EVA-1 traverse has a single station (1); the EVA-2 traverse has four stations (2,3,4,5); and the EVA-3 traverse has five stations (6,7,8,9,10). Stations 10-A and 10-B are alternate locations for Station 10. In addition to the major stations mentioned above, brief stops are planned for sampling between stations using the LRV sampler tool (note diamond-shaped figures), and for deploying explosive charges associated with the Lunar Seismic Profiling Experiment (LSPE - note black x-marks).
Evolving from Planning and Scheduling to Real-Time Operations Support: Design Challenges
NASA Technical Reports Server (NTRS)
Marquez, Jessica J.; Ludowise, Melissa; McCurdy, Michael; Li, Jack
2010-01-01
Versions of Scheduling and Planning Interface for Exploration (SPIFe) have supported a variety of mission operations across NASA. This software tool has evolved and matured over several years, assisting planners who develop intricate schedules. While initially conceived for surface Mars missions, SPIFe has been deployed in other domains, where people rather than robotic explorers, execute plans. As a result, a diverse set of end-users has compelled growth in a new direction: supporting real-time operations. This paper describes the new needs and challenges that accompany this development. Among the key features that have been built for SPIFe are current time indicators integrated into the interface and timeline, as well as other plan attributes that enable execution of scheduled activities. Field tests include mission support for the Lunar CRater Observation and Sensing Satellite (LCROSS), NASA Extreme Environment Mission Operations (NEEMO) and Desert Research and Technology Studies (DRATS) campaigns.
NASA Technical Reports Server (NTRS)
Moore, Kevin D.
2017-01-01
Trying to get your experiment aboard ISS? You likely will need power. Many enditem providers do. ISS Plug-In Plan (IPiP) supports power and data for science, Payloads (or Utilization), vehicle systems, and daily operations through the Electrical Power System (EPS) Secondary Power/Data Subsystem. Yet limited resources and increasing requirements continue to influence decisions on deployment of ISS end items. Given the fluid launch schedule and the rapidly- increasing number of end item providers requiring power support, the focus of the Plug-In Plan has evolved from a simple FIFO recommendation to provide power to end item users, to anticipating future requirements by judicious development and delivery of support equipment (cables, power supplies, power strips, and alternating current (AC) power inverters), employing innovative deployment strategies, and collaborating on end item development. This paper describes the evolution of the ISS Program Office, Engineering Directorate, Flight Operations Directorate (FOD), International Partners and the end item provider relationship and how collaboration successfully leverages unique requirements with limited on- board equipment and resources, tools and processes which result in more agile integration, and describes the process designed for the new ISS end item provider to assure that their power requirements will be met.
Greater Portland intelligent transportation systems (ITS) early deployment plan
DOT National Transportation Integrated Search
1998-03-01
The Greater Portland Intelligent Transportation Systems Early Deployment Plan is a strategic vision of how smart technology can be applied to help improve mobility in Maines largest metropolitan area.
Deployment of a tool for measuring freeway safety performance.
DOT National Transportation Integrated Search
2011-12-01
This project updated and deployed a freeway safety performance measurement tool, building upon a previous project that developed the core methodology. The tool evaluates the cumulative risk over time of an accident or a particular kind of accident. T...
DOT National Transportation Integrated Search
2016-07-22
High level plan that describes the Training and Stakeholder Education plan for the New York City Connected Vehicle Pilot Deployment. The purpose of the training and education plan is to identify the roles that participants will take during the pilot ...
Lam, Sean Shao Wei; Zhang, Ji; Zhang, Zhong Cheng; Oh, Hong Choon; Overton, Jerry; Ng, Yih Yng; Ong, Marcus Eng Hock
2015-02-01
Dynamically reassigning ambulance deployment locations throughout a day to balance ambulance availability and demands can be effective in reducing response times. The objectives of this study were to model dynamic ambulance allocation plans in Singapore based on the system status management (SSM) strategy and to evaluate the dynamic deployment plans using a discrete event simulation (DES) model. The geographical information system-based analysis and mathematical programming were used to develop the dynamic ambulance deployment plans for SSM based on ambulance calls data from January 1, 2011, to June 30, 2011. A DES model that incorporated these plans was used to compare the performance of the dynamic SSM strategy against static reallocation policies under various demands and travel time uncertainties. When the deployment plans based on the SSM strategy were followed strictly, the DES model showed that the geographical information system-based plans resulted in approximately 13-second reduction in the median response times compared to the static reallocation policy, whereas the mathematical programming-based plans resulted in approximately a 44-second reduction. The response times and coverage performances were still better than the static policy when reallocations happened for only 60% of all the recommended moves. Dynamically reassigning ambulance deployment locations based on the SSM strategy can result in superior response times and coverage performance compared to static reallocation policies even when the dynamic plans were not followed strictly. Copyright © 2014 Elsevier Inc. All rights reserved.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Frew, Bethany; Mai, Trieu; Krishnan, Venkat
2016-12-01
In this study, we use the National Renewable Energy Laboratory's (NREL's) Regional Energy Deployment System (ReEDS) capacity expansion model to estimate utility-scale photovoltaic (UPV) deployment trends from present day through 2030. The analysis seeks to inform the U.S. Bureau of Land Management's (BLM's) planning activities related to UPV development on federal lands in Nevada as part of the Resource Management Plan (RMP) revision for the Las Vegas and Pahrump field offices. These planning activities include assessing the demand for new or expanded additional Solar Energy Zones (SEZ), per the process outlined in BLM's Western Solar Plan process.
DOT National Transportation Integrated Search
2016-07-01
The Tampa Hillsborough Expressway Authority (THEA) Connected Vehicle (CV) Pilot Deployment Program is part of a national effort to advance CV technologies by deploying, demonstrating, testing and offering lessons learned for future deployers. The THE...
90-94 ITS Intercity Corridor Study - Strategic Deployment Plan
DOT National Transportation Integrated Search
1996-12-01
PUBLIC-PRIVATE PARTNERSHIP, COMMERCIAL VEHICLES OPERATIONS OR CVO : THE IH 90/94 ITS INTERCITY CORRIDOR STRATEGIC DEPLOYMENT PLAN IS AN APPROACH FOR IMPLEMENTING INTELLIGENT TRANSPORTATION SYSTEMS (ITS) IN THE IH 90/94 CORRIDORS THAT TRAVERSE THE ...
DOT National Transportation Integrated Search
2016-07-01
This document provides guidance material in regards to the Participant Training and Stakeholder Education Plan forthe CV Pilots Deployment Concept Development Phase. The guidance provides key requirements and references indeveloping the training plan...
USDOT guidance summary for connected vehicle deployments : safety management.
DOT National Transportation Integrated Search
2016-07-01
This document provides guidance material in regards to safety management plan for the CV Pilots DeploymentConcept Development Phase. This guidance provides key concepts and references in developing the SafetyManagement Plan in Task 4, lists relevant ...
78 FR 77550 - Integrated Corridor Management Deployment Planning Grants
Federal Register 2010, 2011, 2012, 2013, 2014
2013-12-23
... of this program is to promote the integrated management and operations of the transportation system... DEPARTMENT OF TRANSPORTATION Federal Highway Administration Integrated Corridor Management... the Integrated Corridor Management Deployment Planning Grants. The purpose of this notice was to...
Hackley, Donna M; Mumena, Chrispinus H; Gatarayiha, Agnes; Cancedda, Corrado; Barrow, Jane R
2018-06-01
Harvard School of Dental Medicine, University of Maryland School of Dentistry, and the University of Rwanda (UR) are collaborating to create Rwanda's first School of Dentistry as part of the Human Resources for Health (HRH) Rwanda initiative that aims to strengthen the health care system of Rwanda. The HRH oral health team developed three management tools to measure progress in systems-strengthening efforts: 1) the road map is an operations plan for the entire dental school and facilitates delivery of the curriculum and management of human and material resources; 2) each HRH U.S. faculty member develops a work plan with targeted deliverables for his or her rotation, which is facilitated with biweekly flash reports that measure progress and keep the faculty member focused on his or her specific deliverables; and 3) the redesigned HRH twinning model, changed from twinning of an HRH faculty member with a single Rwandan faculty member to twinning with multiple Rwandan faculty members based on shared academic interests and goals, has improved efficiency, heightened engagement of the UR dental faculty, and increased the impact of HRH U.S. faculty members. These new tools enable the team to measure its progress toward the collaborative's goals and understand the successes and challenges in moving toward the planned targets. The tools have been valuable instruments in fostering discussion around priorities and deployment of resources as well as in developing strong relationships, enabling two-way exchange of knowledge, and promoting sustainability.
Drinking Water Consequences Tools. A Literature Review
DOE Office of Scientific and Technical Information (OSTI.GOV)
Pasqualini, Donatella
2016-05-12
In support of the goals of Department of Homeland Security’s (DHS) National Protection and Programs Directorate and the Federal Emergency Management Agency, the DHS Office of Science and Technology is seeking to develop and/or modify consequence assessment tools to enable drinking water systems owner/operators to estimate the societal and economic consequences of drinking water disruption due to the threats and hazards. This work will expand the breadth of consequence estimation methods and tools using the best-available data describing water distribution infrastructure, owner/assetlevel economic losses, regional-scale economic activity, and health. In addition, this project will deploy the consequence methodology and capabilitymore » within a Web-based platform. This report is intended to support DHS effort providing a review literature review of existing assessment tools of water and wastewater systems consequences to disruptions. The review includes tools that assess water systems resilience, vulnerability, and risk. This will help to understand gaps and limitations of these tools in order to plan for the development of the next-generation consequences tool for water and waste water systems disruption.« less
Metering Plan: Intelligent Operational Strategies Through Enhanced Metering Systems
DOE Office of Scientific and Technical Information (OSTI.GOV)
Pope, Jason E.
The Sustainability Program at Pacific Northwest National Laboratory (PNNL) has adopted a “triple-bottom-line” approach of environmental stewardship, social responsibility, and economic prosperity to its operations. Metering at PNNL works in support of all three, specifically to measure and inform building energy use and greenhouse gas emissions and minimize water use. The foundation for metering at PNNL is a core goal set, which consists of four objectives: providing accurate data without interruption, analyzing data while it is still new, providing actionable recommendations to operations management, and ensuring PNNL’s compliance with contract metering requirements. These core objectives guide the decisions that wemore » make during annual planning and as we operate throughout the year. This 2016 edition of the Metering Plan conveys the metering practices for and vision of the Sustainability Program. Changes in this plan from the 2015 edition include updated tables and an enhanced discussion on energy tracking systems used at PNNL. This plan also discusses updated benchmarking strategies using PNNL’s graphics and analytics tool, BuildingOS by Lucid Design Group. This plan presents our progress toward the metering goals shared by all federal agencies and highlights our successful completion of metering requirements. Currently, PNNL is fully compliant with the applicable legislative and Executive Order metering requirements. PNNL’s approach to the installation of new meters will be discussed. Perhaps most importantly, this plan details the analysis techniques utilized at PNNL that rely on the endless streams of data newly available as a result of increased meter deployment over the last several years. Previous Metering Plans have documented specific meter connection schemes as PNNL focused on deploying meters in a first step toward managing energy and water use. This plan serves not only to highlight PNNL’s successful completion of agency metering goals, but also can be used as a guideline for meter installation and data analysis.« less
Bernardini, Annarita; Larrabide, Ignacio; Morales, Hernán G.; Pennati, Giancarlo; Petrini, Lorenza; Cito, Salvatore; Frangi, Alejandro F.
2011-01-01
Cerebral aneurysms are abnormal focal dilatations of artery walls. The interest in virtual tools to help clinicians to value the effectiveness of different procedures for cerebral aneurysm treatment is constantly growing. This study is focused on the analysis of the influence of different stent deployment approaches on intra-aneurysmal haemodynamics using computational fluid dynamics (CFD). A self-expanding stent was deployed in an idealized aneurysmatic cerebral vessel in two initial positions. Different cases characterized by a progression of simplifications on stent modelling (geometry and material) and vessel material properties were set up, using finite element and fast virtual stenting methods. Then, CFD analysis was performed for untreated and stented vessels. Haemodynamic parameters were analysed qualitatively and quantitatively, comparing the cases and the two initial positions. All the cases predicted a reduction of average wall shear stress and average velocity of almost 50 per cent after stent deployment for both initial positions. Results highlighted that, although some differences in calculated parameters existed across the cases based on the modelling simplifications, all the approaches described the most important effects on intra-aneurysmal haemodynamics. Hence, simpler and faster modelling approaches could be included in clinical workflow and, despite the adopted simplifications, support clinicians in the treatment planning. PMID:22670204
DOT National Transportation Integrated Search
2003-10-01
The purpose of this document is to expand upon the evaluation components presented in "Computer-aided dispatch--traffic management center field operational test final evaluation plan : WSDOT deployment". This document defines the objective, approach,...
DOT National Transportation Integrated Search
1997-08-01
This system architecture paper will discuss proposed architectures for the four infrastructure oriented program areas defined by the project team and presented in the Strategic Deployment Plan (August 1997). This report will concentrate on defi...
Evaluation of the ITS planning process.
DOT National Transportation Integrated Search
1996-01-01
Planning for the deployment of ITS in regions throughout the United States has been underway since the development of the Early Deployment Program by the Federal Highway Administration (FHWA) in 1992. In 1993, the FHWA released Version 1.0 of the 1TS...
Observations, Ideas, and Opinions: Systems Engineering and Integration for Return to Flight
NASA Technical Reports Server (NTRS)
Gafka, George K.
2006-01-01
This presentation addresses project management and systems engineering and integration challenges for return to flight, focusing on the Thermal Protection System Tile Repair Project (TRP). The program documentation philosophy, communication with program requirements flow and philosophy and planned deliverables and documentation are outlined. The development of TRP 'use-as-is' analytical tools is also highlighted and emphasis is placed on the use flight history to assess pre-flight and real-time risk. Additionally, an overview is provided of the repair procedure, including an outline of the logistics deployment chart.
The Kuwait Oil Fire Health Risk Assessment Biological Surveillance Initiative.
Deeter, David P
2011-07-01
An important environmental concern during the first Gulf War (Operation Desert Storm) was assessing exposures and potential health effects in U.S. forces exposed to the Kuwait oil fires. With only 3 weeks for planning, a Biological Surveillance Initiative (BSI) was developed and implemented for a U.S. Army unit. The BSI included blood and urine collections, questionnaire administration, and other elements during the predeployment, deployment, and post-deployment phases. Many BSI objectives were accomplished. Difficulties encountered included planning failures, loss of data and information, and difficulty in interpreting laboratory results. In order for biological surveillance initiatives to provide useful information for future deployments where environmental exposures may be a concern, meaningful, detailed, and realistic planning and preparation must occur long before the deployment is initiated.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Denholm, Paul L; Brinkman, Gregory L; Mai, Trieu T
One of the significant limitations of solar and wind deployment is declining value caused by the limited correlation of renewable energy supply and electricity demand as well as limited flexibility of the power system. Limited flexibility can result from thermal and hydro plants that cannot turn off or reduce output due to technical or economic limits. These limits include the operating range of conventional thermal power plants, the need for process heat from combined heat and power plants, and restrictions on hydro unit operation. To appropriately analyze regional and national energy policies related to renewable deployment, these limits must bemore » accurately captured in grid planning models. In this work, we summarize data sources and methods for U.S. power plants that can be used to capture minimum generation levels in grid planning tools, such as production cost models. We also provide case studies for two locations in the U.S. (California and Texas) that demonstrate the sensitivity of variable generation (VG) curtailment to grid flexibility assumptions which shows the importance of analyzing (and documenting) minimum generation levels in studies of increased VG penetration.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Blair, Nate; Zhou, Ella; Getman, Dan
2015-10-01
This is the Chinese translation of NREL/TP-6A20-64831. Mathematical and computational models are widely used for the analysis and design of both physical and financial systems. Modeling the electric grid is of particular importance to China for three reasons. First, power-sector assets are expensive and long-lived, and they are critical to any country's development. China's electric load, transmission, and other energy-related infrastructure are expected to continue to grow rapidly; therefore it is crucial to understand and help plan for the future in which those assets will operate. Second, China has dramatically increased its deployment of renewable energy (RE), and is likelymore » to continue further accelerating such deployment over the coming decades. Careful planning and assessment of the various aspects (technical, economic, social, and political) of integrating a large amount of renewables on the grid is required. Third, companies need the tools to develop a strategy for their own involvement in the power market China is now developing, and to enable a possible transition to an efficient and high RE future.« less
RDMO - Research Data Management Organiser
NASA Astrophysics Data System (ADS)
Klar, Jochen; Engelhardt, Claudia; Neuroth, Heike; Enke, Harry; Ludwig, Jens
2017-04-01
The Research Data Management Organiser (RDMO) is a new tool to support the structured planning and implementation of the research data management in a scientific project and, in addition, provide the scientist with a textual Data Management Plan (DMP). While DMP are in principle a great tool to optimise the data management during all stages of a research project and to serve as a roadmap for the various data management tasks, their current usage is strongly focused on the requirements of funding agencies. Existing software tools for DMP creation and editing are useful in that respect, but do not sufficiently support the full data life cycle of a project. The RDMO is meant to be a companion for data management issues during and after the whole project. Starting from a structured interview about the project and the data involved, it organizes the data management along tasks and comprises all relevant stakeholders, i.e. researchers, PIs, institutional data managers, IT departments. Adaptations to discipline-specific or institutional needs are supported. The installation of the tool into local environments and its integration into existing administrative IT infrastructure and work flows is given special consideration. The tool is multilingual (at first German and English). In my talk, I will present the different features of the software, show its current stage of development, and how RDMO can be deployed for your institution.
NASA Technical Reports Server (NTRS)
Maris, John
2015-01-01
NASA's Traffic Aware Planner (TAP) is a cockpit decision support tool that provides aircrew with vertical and lateral flight-path optimizations with the intent of achieving significant fuel and time savings, while automatically avoiding traffic, weather, and restricted airspace conflicts. A key step towards the maturation and deployment of TAP concerned its operational evaluation in a representative flight environment. This Systems Engineering Management Plan (SEMP) addresses the test-vehicle design, systems integration, and flight-test planning for the first TAP operational flight evaluations, which were successfully completed in November 2013. The trial outcomes are documented in the Traffic Aware Planner (TAP) flight evaluation paper presented at the 14th AIAA Aviation Technology, Integration, and Operations Conference, Atlanta, GA. (AIAA-2014-2166, Maris, J. M., Haynes, M. A., Wing, D. J., Burke, K. A., Henderson, J., & Woods, S. E., 2014).
A pandemic influenza modeling and visualization tool
DOE Office of Scientific and Technical Information (OSTI.GOV)
Maciejewski, Ross; Livengood, Philip; Rudolph, Stephen
2011-08-01
The National Strategy for Pandemic Influenza outlines a plan for community response to a potential pandemic. In this outline, state and local communities are charged with enhancing their preparedness. In order to help public health officials better understand these charges, we have developed a modeling and visualization toolkit (PanViz) for analyzing the effect of decision measures implemented during a simulated pandemic influenza scenario. Spread vectors based on the point of origin and distance traveled over time are calculated and the factors of age distribution and population density are taken into effect. Healthcare officials are able to explore the effects ofmore » the pandemic on the population through a spatiotemporal view, moving forward and backward through time and inserting decision points at various days to determine the impact. Linked statistical displays are also shown, providing county level summaries of data in terms of the number of sick, hospitalized and dead as a result of the outbreak. Currently, this tool has been deployed in Indiana State Department of Health planning and preparedness exercises, and as an educational tool for demonstrating the impact of social distancing strategies during the recent H1N1 (swine flu) outbreak.« less
DOT National Transportation Integrated Search
2016-07-12
This document describes the Performance Measurement and Evaluation Support Plan for the New York City Department of Transportation New York City (NYC) Connected Vehicle Pilot Deployment (CVPD) Project. The report documents the performance metrics tha...
DOT National Transportation Integrated Search
2016-03-14
The Performance Measurement and Evaluation Support Plan for the Connected Vehicle Pilot Deployment Program Phase 1, Tampa Hillsborough Expressway Authority, outlines the goals and objectives for the Pilot as well as the proposed performance metrics. ...
Strategic plan for early deployment of intelligent transportation systems on Interstate 40 corridor
DOT National Transportation Integrated Search
1997-05-01
This report presents the results of a study by Kimley-Horn and Associates, Inc. for Arizonas Transportation Research Center to develop a strategic plan to deploy ITS rural technologies along the I-40 corridor in northern Arizona. The report descri...
Strategic plan for early deployment of intelligent transportation systems on Interstate 40 Corridor
DOT National Transportation Integrated Search
1997-05-01
This report presents the results of a study by Kimley-Horn and Associates, Inc. for Arizonas Transportation Research Center to develop a strategic plan to deploy ITS rural technologies along the I-40 corridor in northern Arizona. The report descri...
Hazard Management with DOORS: Rail Infrastructure Projects
NASA Astrophysics Data System (ADS)
Hughes, Dave; Saeed, Amer
LOI is a major rail infrastructure project that will contribute to a modernised transport system in time for the 2012 Olympic Games. A review of the procedures and tool infrastructure was conducted in early 2006, coinciding with a planned move to main works. A hazard log support tool was needed to provide: an automatic audit trial, version control and support collaborative working. A DOORS based Hazard Log (DHL) was selected as the Tool Strategy. A systematic approach was followed for the development of DHL, after a series of tests and acceptance gateways, DHL was handed over to the project in autumn 2006. The first few months were used for operational trials and he Hazard Management rocedure was modified to be a hybrid approach that used the strengths of DHL and Excel. The user experience in the deployment of DHL is summarised and directions for future improvement identified.
Ada issues in implementing ART-Ada
NASA Technical Reports Server (NTRS)
Lee, S. Daniel
1990-01-01
Due to the Ada mandate of a number of government agencies, interest in deploying expert systems such as Ada has increased. Recently, several Ada-based expert system tools have been developed. According to a recent benchmark report, these tools do not perform as well as similar tools written in C. While poorly implemented Ada compilers contribute to the poor benchmark result, some fundamental problems of the Ada language itself have been uncovered. Here, the authors describe Ada language issues encountered during the deployment of ART-Ada, an expert system tool for Ada deployment. ART-Ada is being used to implement several prototype expert systems for the Space Station Freedom and the U.S. Air Force.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Nielsen, Roy S.
2015-02-17
New generator technology project is driven by the need to be able to remotely deploy generator technology where it is needed, when it is needed. Both the military and aid programs that provide assistance after disasters could use the ability to deploy energy generation that fits the needs of the situation. Currently, pre-specified generators are deployed, sometime more than half way around the world to provide electricity. Through our Phase-I to Phase III DARPA grant, we will provide a mechanism where a 3d print station and raw materials could be shipped to a deployment site and remotely deployed personnel. Thesemore » remote personnel can collaborate with engineers at a home location where 3d print plans can be optimized for the remote purpose. The plans can then be sent electronically to the remote location for printing, much like NASA sent the plans for a socket wrench to the International Space Station for printing in . If multiple generators need to be deployed at different remote locations, within miles of each other the printer rig can be moved to print the generators where they are needed. 3d printing is growing in the field of manufacturing. 3d printing has matured to the point where many types of materials are now available for many types of manufacturing. Both magnetic and electrically conductive material materials have recently been developed which can now lead to 3d printing of engines and generators. Our project will provide a successful printer rig that can be remotely deployed, to print a generator design in the field as well as provide a process for deploying the printed generator as well. This Systems Engineering Management Plan(SEMP) will provide the planning required for a Phase I DARPA grant that may also include goals for Phase II and Phase II grants. The SEMP provides a proposed project schedule, references, system engineering processes, specialty engineering system deployment and product support sections. Each section will state how our company will provide the necessary services to make this project succeed.« less
Development of a verification program for deployable truss advanced technology
NASA Technical Reports Server (NTRS)
Dyer, Jack E.
1988-01-01
Use of large deployable space structures to satisfy the growth demands of space systems is contingent upon reducing the associated risks that pervade many related technical disciplines. The overall objectives of this program was to develop a detailed plan to verify deployable truss advanced technology applicable to future large space structures and to develop a preliminary design of a deployable truss reflector/beam structure for use a a technology demonstration test article. The planning is based on a Shuttle flight experiment program using deployable 5 and 15 meter aperture tetrahedral truss reflections and a 20 m long deployable truss beam structure. The plan addresses validation of analytical methods, the degree to which ground testing adequately simulates flight and in-space testing requirements for large precision antenna designs. Based on an assessment of future NASA and DOD space system requirements, the program was developed to verify four critical technology areas: deployment, shape accuracy and control, pointing and alignment, and articulation and maneuvers. The flight experiment technology verification objectives can be met using two shuttle flights with the total experiment integrated on a single Shuttle Test Experiment Platform (STEP) and a Mission Peculiar Experiment Support Structure (MPESS). First flight of the experiment can be achieved 60 months after go-ahead with a total program duration of 90 months.
DOT National Transportation Integrated Search
2018-05-31
This Comprehensive Maintenance and Operations Plan (CMOP) describes the types and number of equipment to be operated and maintained for the proposed New York City (NYC) Connected Vehicle Pilot Deployment (CVPD) system. Its objective is to develop a p...
DOT National Transportation Integrated Search
2004-01-28
This document presents the detailed plan to conduct the Key Informants Interviews Test, one of several test activities to be conducted as part of the national evaluation of the regional, multi-modal 511 Traveler Information System Model Deployment. T...
DOT National Transportation Integrated Search
2018-03-01
The purpose of this report is to provide a refined evaluation plan detailing the approach to be used by the Texas A&M Transportation Institute Connected Vehicle Pilot Deployment Evaluation Team for evaluating the mobility, environmental, and public a...
A Wireless Communications Laboratory on Cellular Network Planning
ERIC Educational Resources Information Center
Dawy, Z.; Husseini, A.; Yaacoub, E.; Al-Kanj, L.
2010-01-01
The field of radio network planning and optimization (RNPO) is central for wireless cellular network design, deployment, and enhancement. Wireless cellular operators invest huge sums of capital on deploying, launching, and maintaining their networks in order to ensure competitive performance and high user satisfaction. This work presents a lab…
Reidy, Jennifer; Halvorson, Jennifer; Makowski, Suzana; Katz, Delila; Weinstein, Barbara; McCluskey, Christine; Doering, Alex; DeCarli, Kathryn; Tjia, Jennifer
2017-04-01
The success of a facilitator-based model for advance care planning (ACP) in LaCrosse, Wisconsin, has inspired health systems to aim for widespread documentation of advance directives, but limited resources impair efforts to replicate this model. One promising strategy is the development of interactive, Internet-based tools that might increase access to individualized ACP at minimal cost. However, widespread adoption and implementation of Internet-based ACP efforts has yet to be described. We describe our early experiences in building a systematic, population-based ACP initiative focused on health system-wide deployment of an Internet-based tool as an adjunct to a facilitator-based model. With the sponsorship of our healthcare system's population health leadership, we engaged a diverse group of clinical stakeholders as champions to design an Internet-based ACP tool and facilitate local practice change. We describe how we simultaneously began to train clinicians in ACP conversations, engage patients and health system employees in thinking about ACP, redesign clinic workflows to accommodate ACP discussions, and integrate the Internet-based tool into the electronic medical record (EMR). Over 18 months, our project engaged two subspecialty clinics in a systematic ACP process and began work with a large primary care practice with a large Medicare Accountable Care Organization at-risk population. Overall, 807 people registered at the Internet site and 85% completed ACPs. We learned that changing culture and systems to promote ACP requires a comprehensive vision with simultaneous, interconnected strategies targeting patient education, clinician training, EMR documentation, and community awareness.
Using Docker Compose for the Simple Deployment of an Integrated Drug Target Screening Platform.
List, Markus
2017-06-10
Docker virtualization allows for software tools to be executed in an isolated and controlled environment referred to as a container. In Docker containers, dependencies are provided exactly as intended by the developer and, consequently, they simplify the distribution of scientific software and foster reproducible research. The Docker paradigm is that each container encapsulates one particular software tool. However, to analyze complex biomedical data sets, it is often necessary to combine several software tools into elaborate workflows. To address this challenge, several Docker containers need to be instantiated and properly integrated, which complicates the software deployment process unnecessarily. Here, we demonstrate how an extension to Docker, Docker compose, can be used to mitigate these problems by providing a unified setup routine that deploys several tools in an integrated fashion. We demonstrate the power of this approach by example of a Docker compose setup for a drug target screening platform consisting of five integrated web applications and shared infrastructure, deployable in just two lines of codes.
Lunar-based optical telescopes: Planning astronomical tools of the twenty-first century
NASA Astrophysics Data System (ADS)
Hilchey, J. D.; Nein, M. E.
1995-02-01
A succession of optical telescopes, ranging in aperture from 1 to 16 m or more, can be deployed and operated on the lunar surface over the next half-century. These candidates to succeed NASA's Great Observatories would capitalize on the unique observational advantages offered by the Moon. The Lunar Telescope Working Group and the LUTE Task Team of the George C. Marshall Space Flight Center (MSFC) have assessed the feasibility of developing and deploying these facilities. Studies include the 16-m Large Lunar Telescope (LLT); the Lunar Cluster Telescope Experiment (LCTE), a 4-m precursor to the LLT; the 2-m Lunar Transit Telescope (LTT); and its precursor, the 1-m Lunar Ultraviolet Telescope Experiment (LUTE). The feasibility of developing and deploying each telescope was assessed and system requirements and options for supporting technologies, subsystems, transportation, and operations were detailed. Influences of lunar environment factors and site selection on telescope design and operation were evaluated, and design approaches and key tradeoffs were established. This paper provides an overview of the study results. Design concepts and brief system descriptions are provided, including subsystem and mission options selected for the concepts.
Improving Allocation And Management Of The Health Workforce In Zambia.
Walsh, Fiona J; Musonda, Mutinta; Mwila, Jere; Prust, Margaret Lippitt; Vosburg, Kathryn Bradford; Fink, Günther; Berman, Peter; Rockers, Peter C
2017-05-01
Building a health workforce in low-income countries requires a focused investment of time and resources, and ministries of health need tools to create staffing plans and prioritize spending on staff for overburdened health facilities. In Zambia a demand-based workload model was developed to calculate the number of health workers required to meet demands for essential health services and inform a rational and optimized strategy for deploying new public-sector staff members to the country's health facilities. Between 2009 and 2011 Zambia applied this optimized deployment policy, allocating new health workers to areas with the greatest demand for services. The country increased its health worker staffing in districts with fewer than one health worker per 1,000 people by 25.2 percent, adding 949 health workers to facilities that faced severe staffing shortages. At facilities that had had low staffing levels, adding a skilled provider was associated with an additional 103 outpatient consultations per quarter. Policy makers in resource-limited countries should consider using strategic approaches to identifying and deploying a rational distribution of health workers to provide the greatest coverage of health services to their populations. Project HOPE—The People-to-People Health Foundation, Inc.
STEP flight experiments Large Deployable Reflector (LDR) telescope
NASA Technical Reports Server (NTRS)
Runge, F. C.
1984-01-01
Flight testing plans for a large deployable infrared reflector telescope to be tested on a space platform are discussed. Subsystem parts, subassemblies, and whole assemblies are discussed. Assurance of operational deployability, rigidization, alignment, and serviceability will be sought.
DOT National Transportation Integrated Search
1996-12-02
THE PURPOSE OF THIS DOCUMENT IS TO PROVIDE INFORMATION ON THE PLANNING FOR THE DEVELOPMENT AND DEPLOYMENT OF EDI STANDARDS FOR COMMERCIAL VEHICLE INFORMATION SYSTEMS AND NETWORKS (CVISN). THE STATUS, PRIORITIES, AND SCHEDULES FOR THIS EFFORT ARE CONT...
Downing, Gregory J; Boyle, Scott N; Brinner, Kristin M; Osheroff, Jerome A
2009-10-08
Advances in technology and the scientific understanding of disease processes are presenting new opportunities to improve health through individualized approaches to patient management referred to as personalized medicine. Future health care strategies that deploy genomic technologies and molecular therapies will bring opportunities to prevent, predict, and pre-empt disease processes but will be dependent on knowledge management capabilities for health care providers that are not currently available. A key cornerstone to the potential application of this knowledge will be effective use of electronic health records. In particular, appropriate clinical use of genomic test results and molecularly-targeted therapies present important challenges in patient management that can be effectively addressed using electronic clinical decision support technologies. Approaches to shaping future health information needs for personalized medicine were undertaken by a work group of the American Health Information Community. A needs assessment for clinical decision support in electronic health record systems to support personalized medical practices was conducted to guide health future development activities. Further, a suggested action plan was developed for government, researchers and research institutions, developers of electronic information tools (including clinical guidelines, and quality measures), and standards development organizations to meet the needs for personalized approaches to medical practice. In this article, we focus these activities on stakeholder organizations as an operational framework to help identify and coordinate needs and opportunities for clinical decision support tools to enable personalized medicine. This perspective addresses conceptual approaches that can be undertaken to develop and apply clinical decision support in electronic health record systems to achieve personalized medical care. In addition, to represent meaningful benefits to personalized decision-making, a comparison of current and future applications of clinical decision support to enable individualized medical treatment plans is presented. If clinical decision support tools are to impact outcomes in a clear and positive manner, their development and deployment must therefore consider the needs of the providers, including specific practice needs, information workflow, and practice environment.
2009-01-01
Background Advances in technology and the scientific understanding of disease processes are presenting new opportunities to improve health through individualized approaches to patient management referred to as personalized medicine. Future health care strategies that deploy genomic technologies and molecular therapies will bring opportunities to prevent, predict, and pre-empt disease processes but will be dependent on knowledge management capabilities for health care providers that are not currently available. A key cornerstone to the potential application of this knowledge will be effective use of electronic health records. In particular, appropriate clinical use of genomic test results and molecularly-targeted therapies present important challenges in patient management that can be effectively addressed using electronic clinical decision support technologies. Discussion Approaches to shaping future health information needs for personalized medicine were undertaken by a work group of the American Health Information Community. A needs assessment for clinical decision support in electronic health record systems to support personalized medical practices was conducted to guide health future development activities. Further, a suggested action plan was developed for government, researchers and research institutions, developers of electronic information tools (including clinical guidelines, and quality measures), and standards development organizations to meet the needs for personalized approaches to medical practice. In this article, we focus these activities on stakeholder organizations as an operational framework to help identify and coordinate needs and opportunities for clinical decision support tools to enable personalized medicine. Summary This perspective addresses conceptual approaches that can be undertaken to develop and apply clinical decision support in electronic health record systems to achieve personalized medical care. In addition, to represent meaningful benefits to personalized decision-making, a comparison of current and future applications of clinical decision support to enable individualized medical treatment plans is presented. If clinical decision support tools are to impact outcomes in a clear and positive manner, their development and deployment must therefore consider the needs of the providers, including specific practice needs, information workflow, and practice environment. PMID:19814826
Weiss, Lizabeth M; Drake, Audrey
2007-01-01
An electronic database was developed for succession planning and placement of nursing leaders interested and ready, willing, and able to accept an assignment in a nursing leadership position. The tool is a 1-page form used to identify candidates for nursing leadership assignments. This tool has been deployed nationally, with access to the database restricted to nurse executives at every Veterans Health Administration facility for the purpose of entering the names of developed nurse leaders ready for a leadership assignment. The tool is easily accessed through the Veterans Health Administration Office of Nursing Service, and by limiting access to the nurse executive group, ensures candidates identified are qualified. Demographic information included on the survey tool includes the candidate's demographic information and other certifications/credentials. This completed information form is entered into a database from which a report can be generated, resulting in a listing of potential candidates to contact to supplement a local or Veterans Integrated Service Network wide position announcement. The data forms can be sorted by positions, areas of clinical or functional experience, training programs completed, and geographic preference. The forms can be edited or updated and/or added or deleted in the system as the need is identified. This tool allows facilities with limited internal candidates to have a resource with Department of Veterans Affairs prepared staff in which to seek additional candidates. It also provides a way for interested candidates to be considered for positions outside of their local geographic area.
Afrin, Lawrence B; Arana, George W; Medio, Franklin J; Ybarra, Angela F N; Clarke, Harry S
2006-05-01
Accreditation organizations, financial stakeholders, legal systems, and regulatory agencies have increased the need for accountability in educational processes and curricular outcomes of graduate medical education. This demand for greater programmatic monitoring has placed pressure on institutions with graduate medical education (GME) programs to develop greater oversight of these programs. Meeting these challenges requires development of new GME management strategies and tools for institutional GME administrators to scrutinize programs, while still allowing these programs the autonomy to develop and implement educational methods to meet their unique training needs. At the Medical University of South Carolina (MUSC), senior administrators in the college of medicine felt electronic information management was a critical strategy for success and thus proceeded to carefully select an electronic residency management system (ERMS) to provide functionality for both individual programs and the GME enterprise as a whole. Initial plans in 2002 for a phased deployment had to be changed to a much more rapid deployment due to regulatory issues. Extensive communication and cooperation among MUSC's GME leaders resulted in a successful deployment in 2003. Evaluation completion rates have substantially improved, duty hours are carefully monitored, patient safety has improved through more careful oversight of residents' procedural privileges, regulators have been pleased, and central GME administrative visibility of program performance has dramatically improved. The system is now being expanded to MUSC's medical school and other health professions colleges. The authors discuss lessons learned and opportunities and challenges ahead, which include improving tracking of development of procedural competency, establishing and monitoring program performance standards, and integrating the ERMS with GME reimbursement systems.
Further Automate Planned Cluster Maintenance to Minimize System Downtime during Maintenance Windows
DOE Office of Scientific and Technical Information (OSTI.GOV)
Springmeyer, R.
This report documents the integration and testing of the automated update process of compute clusters in LC to minimize impact to user productivity. Description: A set of scripts will be written and deployed to further standardize cluster maintenance activities and minimize downtime during planned maintenance windows. Completion Criteria: When the scripts have been deployed and used during planned maintenance windows and a timing comparison is completed between the existing process and the new more automated process, this milestone is complete. This milestone was completed on Aug 23, 2016 on the new CTS1 cluster called Jade when a request to upgrademore » the version of TOSS 3 was initiated while SWL jobs and normal user jobs were running. Jobs that were running when the update to the system began continued to run to completion. New jobs on the cluster started on the new release of TOSS 3. No system administrator action was required. Current update procedures in TOSS 2 begin by killing all users jobs. Then all diskfull nodes are updated, which can take a few hours. Only after the updates are applied are all nodes are rebooted, and then finally put back into service. A system administrator is required for all steps. In terms of human time spent during a cluster OS update, the TOSS 3 automated procedure on Jade took 0 FTE hours. Doing the same update without the Toss Update Tool would have required 4 FTE hours.« less
Badr, Elsheikh; Mohamed, Nazar A; Afzal, Muhammad Mahmood; Bile, Khalif Mohamud
2013-11-01
Human resources for health (HRH) in the Sudan were limited by shortages and the maldistribution of health workers, poor management, service fragmentation, poor retention of health workers in rural areas, and a weak health information system. A "country coordination and facilitation" process was implemented to strengthen the national HRH observatory, provide a coordination platform for key stakeholders, catalyse policy support and HRH planning, harmonize the mobilization of resources, strengthen HRH managerial structures, establish new training institutions and scale up the training of community health workers. The national government of the Sudan sanctioned state-level governance of the health system but many states lacked coherent HRH plans and policies. A paucity of training institutions constrained HRH production and the adequate and equitable deployment of health workers in rural areas. The country coordination and facilitation process prompted the establishment of a robust HRH information system and the development of the technical capacities and tools necessary for data analysis and evidence-based participatory decision-making and action. The success of the country coordination and facilitation process was substantiated by the stakeholders' coordinated support, which was built on solid evidence of the challenges in HRH and shared accountability in the planning and implementation of responses to those challenges. The support led to political commitment and the mobilization of resources for HRH. The leadership that was promoted and the educational institutions that were opened should facilitate the training, deployment and retention of the health workers needed to achieve universal health coverage.
NASA Technical Reports Server (NTRS)
Garbeff, Theodore J., II; Baerny, Jennifer K.
2017-01-01
The following details recent efforts undertaken at the NASA Ames Unitary Plan wind tunnels to design and deploy an advanced, production-level infrared (IR) flow visualization data system. Highly sensitive IR cameras, coupled with in-line image processing, have enabled the visualization of wind tunnel model surface flow features as they develop in real-time. Boundary layer transition, shock impingement, junction flow, vortex dynamics, and buffet are routinely observed in both transonic and supersonic flow regimes all without the need of dedicated ramps in test section total temperature. Successful measurements have been performed on wing-body sting mounted test articles, semi-span floor mounted aircraft models, and sting mounted launch vehicle configurations. The unique requirements of imaging in production wind tunnel testing has led to advancements in the deployment of advanced IR cameras in a harsh test environment, robust data acquisition storage and workflow, real-time image processing algorithms, and evaluation of optimal surface treatments. The addition of a multi-camera IR flow visualization data system to the Ames UPWT has demonstrated itself to be a valuable analyses tool in the study of new and old aircraft/launch vehicle aerodynamics and has provided new insight for the evaluation of computational techniques.
DOT National Transportation Integrated Search
2000-10-01
The Phoenix, Arizona Metropolitan Model Deployment was one of four cities included in the Metropolitan Model Deployment Initiative (MMDI). The initiative was set forth in 1996 to serve as model deployments of ITS infrastructure and integration. One o...
Local evaluation for the Cumberland gap tunnel regional ITS deployment.
DOT National Transportation Integrated Search
2010-12-01
This report is the local evaluation of an Intelligent Transportation System deployment for the Cumberland Gap Tunnel and U.S. 25E corridor in Tennessee and Kentucky. This report examines the planning for the deployment and the systems and components ...
NASA Global GNSS Network (GGN) Status and Plans
NASA Astrophysics Data System (ADS)
Doelger, S.; Sklar, J.; Blume, F.; Meertens, C. M.; Mattioli, G. S.
2015-12-01
UNAVCO, in conjunction with JPL, is responsible for monitoring the 62 GNSS permanent stations, which include 88 GPS receivers, which comprise the NASA Global GNSS Network (GGN). These sites represent approximately 16% of the ~400 International GNSS Service (IGS) stations, and they provide a globally distributed GNSS network to support NASA operations and its commitments to GGOS. UNAVCO provides data flow monitoring, trouble-shooting, station installation, maintenance, as well as engineering services to improve the capabilities and performance of station infrastructure. Activities this past year include the installation of a geodetic quality wellhead monument for the new SEY2 station to replace SEY1, which is mounted on a UCSD seismic station in the Seychelles Islands. SEY1 will be removed soon to accommodate planned maintenance and upgrades by UCSD. Data from both SEY1 and SEY2 are being collected concurrently until maintenance begins. MRTG (Multi Router Traffic Grapher), a tool to aid in characterizing bandwidth usage and to identify communications problems, is now being used to monitor data throughput at 7 stations where VSAT or radio telemetry are used, including: ABPO; AREQ; FALK; GUAM; HARV; ISPA; QUIN; and STHL. Aging computers are being replaced with new hardware running Linux CentOS. These are semi-ruggedized low power solid-state systems built to endure challenging environments. With the aid of on-site collaborators, systems are now deployed at: FALK; CUSV; KELY; STHL; SANT; and ZAMB. Last, 4 new GPS stations were deployed for NASA's Space Geodesy Project (SGP); three of which (KOKF, KOKG, and KOKR) are located at Koke'e Park Geophysical Observatory on Kauai, Hawai'i, and HAL1 at the Haleakala observatory complex on Maui, Hawai'i. A campaign system was set up at Koke'e in order to sample data quality to determine if an additional station would be viable. Planning is ongoing for deployment of several new stations next year at McDonald Observatory (TX).
Light Armored Reconnaissance: Misunderstood and Underemployed in Deep Operations
2010-04-01
then CoB 2na LA! Bn deploys in support of Operation NIMROD DANCER in Panama Dec 1989 Co D, 2d LA! Bn deploys in support of Operation JUST CAUSE in...Marine Corns Long- Range Plan (MLRP) and U.S. Marine Corps Mid-Range Plan (MMRP). An analysis of the threat discussed in these documents reveals
SU-F-T-80: A Mobile Application for Intra-Operative Electron Radiotherapy Treatment Planning
DOE Office of Scientific and Technical Information (OSTI.GOV)
Williams, C; Harvard Medical School, Boston, MA; Crowley, E
Purpose: Intraoperative electron radiotherapy (IORT) poses a unique set of challenges for treatment planning. Planning must be performed in a busy operating room environment over a short timeframe often with little advance knowledge of the treatment depth or applicator size. Furthermore, IORT accelerators can have a large number of possible applicators, requiring extensive databooks that must be searched for the appropriate dosimetric parameters. The goal of this work is to develop a software tool to assist in the planning process that is suited to the challenges faced in the IORT environment. Methods: We developed a mobile application using HTML5 andmore » Javascript that can be deployed to tablet devices suitable for use in the operating room. The user selects the desired treatment parameters cone diameter, bevel angle, and energy (a total of 141 datasets) and desired bolus. The application generates an interactive display that allows the user to dynamically select points on the depth-dose curve and to visualize the shape of the corresponding isodose contours. The user can indicate a prescription isodose line or depth. The software performs a monitor unit calculation and generates a PDF report. Results: We present our application, which is now used routinely in our IORT practice. It has been employed successfully in over 23 cases. The interactivity of the isodose distributions was found to be of particular use to physicians who are less-frequent IORT users, as well as for the education of residents and trainees. Conclusion: This software has served as a useful tool in IORT planning, and demonstrates the need for treatment planning tools that are designed for the specialized challenges encountered in IORT. This software is the subject of a license agreement with the IntraOp Medical Corporation. This software is the subject of a license agreement between Massachusetts General Hospital / Partners Healthcare and the IntraOp Medical Corporation. CLW is consulting on software development with the IntraOp Medical Corporation.« less
The installation of a sub sea floor observatory using the sea floor drill rig MeBo
NASA Astrophysics Data System (ADS)
Wefer, G.; Freudenthal, T.; Kopf, A.
2012-04-01
Sea floor drill rigs that can be deployed from standard research vessels are bridging the gap between dedicated drill ships that are used for deep drillings in the range of several hundred meters below sea floor and conventional sampling tools like gravity corers, piston corer or dredges that only scratch the surface of the sea floor. A major advantage of such robotic drill rigs is that the drilling action is conducted from a stable platform at the sea bed independent of any ship movements due to waves, wind or currents. At the MARUM Center for Marine Environmental Sciences at the University of Bremen we developed the sea bed drill rig MeBo that can be deployed from standard research vessels. The drill rig is deployed on the sea floor and controlled from the vessel. Drilling tools for coring the sea floor down to 70 m can be stored on two magazines on the rig. A steel-armoured umbilical is used for lowering the rig to the sea bed in water depths up to 2000 m in the present system configuration. It was successfully operated on ten expeditions since 2005 and drilled more than 1000 m in different types of geology including hemipelagic mud, glacial till as well as sedimentary and crystalline rocks. MeBo boreholes be equipped with sensors and used for long term monitoring are planned. Depending on the scientific demands, a MeBoCORK monitoring system will allow in situ measurements of eg. temperature and pressure. The "MeBoCORK" will be equipped with data loggers and data transmission interface for reading out the collected data from the vessel. By additional payload installation on the MeBoCORK with an ROV it will be possible to increase the energy capacity as well as to conduct fluid sampling in the bore hole for geochemical analyses. It is planned to install a prototype of this additional payload with the MARUM ROV QUEST4000M during the following R/V SONNE cruise in July 2012.
DOT National Transportation Integrated Search
2000-06-01
The state of the intelligent transportation systems (ITS) program in Texas is summarized and analyzed. The report first reviews the types of ITS deployments within each Texas Department of Transportation district. The methods used to plan, design, co...
Kouadio, Koffi; Okeibunor, Joseph; Nsubuga, Peter; Mihigo, Richard; Mkanda, Pascal
2016-10-10
The continuous deployments of polio resources, infrastructures and systems for responding to other disease outbreaks in many African countries has led to a number of lessons considered as best practice that need to be documented for strengthening preparedness and response activities in future outbreaks. We reviewed and documented the influence of polio best practices in outbreak preparedness and response in Angola, Nigeria and Ethiopia. Data from relevant programmes of the WHO African Region were also analyzed to demonstrate clearly the relative contributions of PEI resources and infrastructure to effective disease outbreak preparedness and response. Polio resources including, human, financial, and logistic, tool and strategies have tremendously contributed to responding to diseases outbreaks across the African region. In Angola, Nigeria and Ethiopia, many disease epidemics including Marburg Hemorrhagic fever, Dengue fever, Ebola Virus Diseases (EVD), Measles, Anthrax and Shigella have been controlled using existing polio Eradication Initiatives resources. Polio staffs are usually deployed in occasions to supports outbreak response activities (coordination, surveillance, contact tracing, case investigation, finance, data management, etc.). Polio logistics such vehicles, laboratories were also used in the response activities to other infectious diseases. Many polio tools including micro planning, dashboard, guidelines, SOPs on preparedness and response have also benefited to other epidemic-prone diseases. The Countries' preparedness and response plan to WPV importation as well as the Polio Emergency Operation Center models were successfully used to develop, strengthen and respond to many other diseases outbreak with the implication of partners and the strong leadership and ownership of governments. This review has important implications for WHO/AFRO initiative to strengthening and improving disease outbreak preparedness and responses in the African Region in respect to the international health regulations core capacities. Copyright © 2016 World Health Organization Regional Office for Africa. Published by Elsevier Ltd.. All rights reserved.
[Knowledge transfer to prevent falls in a cardiovascular setting].
Malouin-Benoit, Marie-Christine; Cossette, Sylvie
2012-01-01
The objective of the clinical project was to plan and deploy a knowledge translation approach to prevent falls among elderly patients hospitalized in a unit of cardiovascular medicine. A combination of education strategies built around interactive workshops enabled the implementation of a screening tool and of an up-to-date preventive intervention guide. Twenty-four workshops were conducted in all three work shifts and an implementation follow-up was made. The participation rate was 93% of the unit's active staff The increased use of prevention tools and of an intervention guide to prevent falls suggests an increased level of awareness as a result of the project. The staff expressed their satisfaction on having been consulted and involved early in the implementation process. Moreover, the flexible schedule and focus on a bilateral sharing of knowledge through brief interactive workshops were appreciated.
Analysis of ETMS Data Quality for Traffic Flow Management Decisions
NASA Technical Reports Server (NTRS)
Chatterji, Gano B.; Sridhar, Banavar; Kim, Douglas
2003-01-01
The data needed for air traffic flow management decision support tools is provided by the Enhanced Traffic Management System (ETMS). This includes both the tools that are in current use and the ones being developed for future deployment. Since the quality of decision support provided by all these tools will be influenced by the quality of the input ETMS data, an assessment of ETMS data quality is needed. Motivated by this desire, ETMS data quality is examined in this paper in terms of the unavailability of flight plans, deviation from the filed flight plans, departure delays, altitude errors and track data drops. Although many of these data quality issues are not new, little is known about their extent. A goal of this paper is to document the magnitude of data quality issues supported by numerical analysis of ETMS data. Guided by this goal, ETMS data for a 24-hour period were processed to determine the number of aircraft with missing flight plan messages at any given instant of time. Results are presented for aircraft above 18,000 feet altitude and also at all altitudes. Since deviation from filed flight plan is also a major cause of trajectory-modeling errors, statistics of deviations are presented. Errors in proposed departure times and ETMS-generated vertical profiles are also shown. A method for conditioning the vertical profiles for improving demand prediction accuracy is described. Graphs of actual sector counts obtained using these vertical profiles are compared with those obtained using the Host data for sectors in the Fort Worth Center to demonstrate the benefit of preprocessing. Finally, results are presented to quantify the extent of data drops. A method for propagating track positions during ETMS data drops is also described.
Experience-based quality control of clinical intensity-modulated radiotherapy planning.
Moore, Kevin L; Brame, R Scott; Low, Daniel A; Mutic, Sasa
2011-10-01
To incorporate a quality control tool, according to previous planning experience and patient-specific anatomic information, into the intensity-modulated radiotherapy (IMRT) plan generation process and to determine whether the tool improved treatment plan quality. A retrospective study of 42 IMRT plans demonstrated a correlation between the fraction of organs at risk (OARs) overlapping the planning target volume and the mean dose. This yielded a model, predicted dose = prescription dose (0.2 + 0.8 [1 - exp(-3 overlapping planning target volume/volume of OAR)]), that predicted the achievable mean doses according to the planning target volume overlap/volume of OAR and the prescription dose. The model was incorporated into the planning process by way of a user-executable script that reported the predicted dose for any OAR. The script was introduced to clinicians engaged in IMRT planning and deployed thereafter. The script's effect was evaluated by tracking δ = (mean dose-predicted dose)/predicted dose, the fraction by which the mean dose exceeded the model. All OARs under investigation (rectum and bladder in prostate cancer; parotid glands, esophagus, and larynx in head-and-neck cancer) exhibited both smaller δ and reduced variability after script implementation. These effects were substantial for the parotid glands, for which the previous δ = 0.28 ± 0.24 was reduced to δ = 0.13 ± 0.10. The clinical relevance was most evident in the subset of cases in which the parotid glands were potentially salvageable (predicted dose <30 Gy). Before script implementation, an average of 30.1 Gy was delivered to the salvageable cases, with an average predicted dose of 20.3 Gy. After implementation, an average of 18.7 Gy was delivered to salvageable cases, with an average predicted dose of 17.2 Gy. In the prostate cases, the rectum model excess was reduced from δ = 0.28 ± 0.20 to δ = 0.07 ± 0.15. On surveying dosimetrists at the end of the study, most reported that the script both improved their IMRT planning (8 of 10) and increased their efficiency (6 of 10). This tool proved successful in increasing normal tissue sparing and reducing interclinician variability, providing effective quality control of the IMRT plan development process. Copyright © 2011 Elsevier Inc. All rights reserved.
Design Validation Methodology Development for an Aircraft Sensor Deployment System
NASA Astrophysics Data System (ADS)
Wowczuk, Zenovy S.
The OCULUS 1.0 Sensor Deployment concept design, was developed in 2004 at West Virginia University (WVU), outlined the general concept of a deployment system to be used on a C-130 aircraft. As a sequel, a new system, OCULUS 1.1, has been developed and designed. The new system transfers the concept system design to a safety of flight design, and also enhanced to a pre-production system to be used as the test bed to gain full military certification approval. The OCULUS 1.1 system has an implemented standard deployment system/procedure to go along with a design suited for military certification and implementation. This design process included analysis of the system's critical components and the generation of a critical component holistic model to be used as an analysis tool for future payload modification made to the system. Following the completion of the OCULUS 1.1 design, preparations and procedures for obtaining military airworthiness certification are described. The airworthiness process includes working with the agency overseeing all modifications to the normal operating procedures made to military C-130 aircraft and preparing the system for an experimental flight test. The critical steps in his process include developing a complete documentation package that details the analysis performed on the OCULUS 1.1 system and also the design of experiment flight test plan to analyze the system. Following the approval of the documentation and design of experiment an experimental flight test of the OCULUS 1.1 system was performed to verify the safety and airworthiness of the system. This test proved successfully that the OCULUS 1.1 system design was airworthy and approved for military use. The OCULUS 1.1 deployment system offers an open architecture design that is ideal for use as a sensor testing platform for developmental airborne sensors. The system's patented deployment methodology presents a simplistic approach to reaching the systems final operating position which offers the most robust field of view area of rear ramp deployment systems.
The First Interlaced Continuum Robot, Devised to Intrinsically Follow the Leader
Kang, Byungjeon; Kojcev, Risto; Sinibaldi, Edoardo
2016-01-01
Flexible probes that are safely deployed to hard-to-reach targets while avoiding critical structures are strategic in several high-impact application fields, including the biomedical sector and the sector of inspections at large. A critical problem for these tools is the best approach for deploying an entire tool body, not only its tip, on a sought trajectory. A probe that achieves this deployment is considered to follow the leader (or to achieve follow-the-leader deployment) because its body sections follow the track traced by its tip. Follow-the-leader deployment through cavities is complicated due to a lack of external supports. Currently, no definitive implementation for a probe that is intrinsically able to follow the leader, i.e., without relying on external supports, has been achieved. In this paper, we present a completely new device, namely the first interlaced continuum robot, devised to intrinsically follow the leader. We developed the interlaced configuration by pursuing a conceptual approach irrespective of application-specific constraints and assuming two flexible tools with controllable stiffness. We questioned the possibility of solving the previously mentioned deployment problem by harnessing probe symmetry during the design process. This study examines the entire development of the novel interlaced probe: model-based conceptual design, detailed design and prototyping, and preliminary experimental assessment. Our probe can build a track with a radius of curvature that is as small as twice the probe diameter, which enables it to outperform state-of-the-art tools that are aimed at follow-the-leader deployment. Despite the limitations that are inherently associated with its original character, this study provides a prototypical approach to the design of interlaced continuum systems and demonstrates the first interlaced continuum probe, which is intrinsically able to follow the leader. PMID:26914328
The First Interlaced Continuum Robot, Devised to Intrinsically Follow the Leader.
Kang, Byungjeon; Kojcev, Risto; Sinibaldi, Edoardo
2016-01-01
Flexible probes that are safely deployed to hard-to-reach targets while avoiding critical structures are strategic in several high-impact application fields, including the biomedical sector and the sector of inspections at large. A critical problem for these tools is the best approach for deploying an entire tool body, not only its tip, on a sought trajectory. A probe that achieves this deployment is considered to follow the leader (or to achieve follow-the-leader deployment) because its body sections follow the track traced by its tip. Follow-the-leader deployment through cavities is complicated due to a lack of external supports. Currently, no definitive implementation for a probe that is intrinsically able to follow the leader, i.e., without relying on external supports, has been achieved. In this paper, we present a completely new device, namely the first interlaced continuum robot, devised to intrinsically follow the leader. We developed the interlaced configuration by pursuing a conceptual approach irrespective of application-specific constraints and assuming two flexible tools with controllable stiffness. We questioned the possibility of solving the previously mentioned deployment problem by harnessing probe symmetry during the design process. This study examines the entire development of the novel interlaced probe: model-based conceptual design, detailed design and prototyping, and preliminary experimental assessment. Our probe can build a track with a radius of curvature that is as small as twice the probe diameter, which enables it to outperform state-of-the-art tools that are aimed at follow-the-leader deployment. Despite the limitations that are inherently associated with its original character, this study provides a prototypical approach to the design of interlaced continuum systems and demonstrates the first interlaced continuum probe, which is intrinsically able to follow the leader.
DOT National Transportation Integrated Search
2016-08-11
The Wyoming Department of Transportations (WYDOT) Connected Vehicle (CV) Pilot Deployment Program is intended to develop a suite of applications that utilize vehicle to infrastructure (V2I) and vehicle to vehicle (V2V) communication technology to ...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Prod'homme, A.; Drouvot, O.; Gregory, J.
In 2009, Savannah River Remediation LLC (SRR) assumed the management lead of the Liquid Waste (LW) Program at the Savannah River Site (SRS). The four SRR partners and AREVA, as an integrated subcontractor are performing the ongoing effort to safely and reliably: - Close High Level Waste (HLW) storage tanks; - Maximize waste throughput at the Defense Waste Processing Facility (DWPF); - Process salt waste into stable final waste form; - Manage the HLW liquid waste material stored at SRS. As part of these initiatives, SRR and AREVA deployed a performance management methodology based on Overall Equipment Effectiveness (OEE) atmore » the DWPF in order to support the required production increase. This project took advantage of lessons learned by AREVA through the deployment of Total Productive Maintenance and Visual Management methodologies at the La Hague reprocessing facility in France. The project also took advantage of measurement data collected from different steps of the DWPF process by the SRR team (Melter Engineering, Chemical Process Engineering, Laboratory Operations, Plant Operations). Today the SRR team has a standard method for measuring processing time throughout the facility, a reliable source of objective data for use in decision-making at all levels, and a better balance between engineering department goals and operational goals. Preliminary results show that the deployment of this performance management methodology to the LW program at SRS has already significantly contributed to the DWPF throughput increases and is being deployed in the Saltstone facility. As part of the liquid waste program on Savannah River Site, SRR committed to enhance production throughput of DWPF. Beyond technical modifications implemented at different location of the facility, SRR deployed performance management methodology based on OEE metrics. The implementation benefited from the experience gained by AREVA in its own facilities in France. OEE proved to be a valuable tool in order to support the enhancement program in DWPF by providing unified metrics to measure plant performances, identify bottleneck location, and rank the most time consuming causes from objective data shared between the different groups belonging to the organization. Beyond OEE, the Visual Management tool adapted from the one used at La Hague were also provided in order to further enhance communication within the operating teams. As a result of all the initiatives implemented on DWPF, achieved production has been increased to record rates from FY10 to FY11. It is expected that thanks to the performance management tools now available within DWPF, these results will be sustained and even improved in the future to meet system plan targets. (authors)« less
2016-03-24
2009.1 107 of the 158 satellites launched are operated by commercial entities.1 In early 2015, SpaceX and OneWeb each announced their plans to deploy...very large constellations of small satellites ( SpaceX – 4025, OneWeb – 648).1 Each of the OneWeb satellites is planned to weigh around 150 kg,12...while SpaceX expects their satellites to weigh several hundred kilograms each.13 Clearly, the growth in the use of small satellites is causing, and will
DOT National Transportation Integrated Search
1996-03-21
THIS PAPER PROVIDES CURRENT BACKGROUND ON THE QUESTION "WHAT DO WE KNOW ABOUT WHY VARIOUS TRANSPORTATION AGENCIES DO OR DO NOT PLAN TO DEPLOY ITI", AND PROVIDES A SUMMARY OF WHAT IS KNOWN. THE FOLLOWING SECTION EXAMINES EXISTING ITI DEPLOYMENT STUDIE...
PACS project management utilizing web-based tools
NASA Astrophysics Data System (ADS)
Patel, Sunil; Levin, Brad; Gac, Robert J., Jr.; Harding, Douglas, Jr.; Chacko, Anna K.; Radvany, Martin; Romlein, John R.
2000-05-01
As Picture Archiving and Communications Systems (PACS) implementations become more widespread, the management of deploying large, multi-facility PACS will become a more frequent occurrence. The tools and usability of the World Wide Web to disseminate project management information obviates time, distance, participant availability, and data format constraints, allowing for the effective collection and dissemination of PACS planning, implementation information, for a potentially limitless number of concurrent PACS sites. This paper will speak to tools, such as (1) a topic specific discussion board, (2) a 'restricted' Intranet, within a 'project' Intranet. We will also discuss project specific methods currently in use in a leading edge, regional PACS implementation concerning the sharing of project schedules, physical drawings, images of implementations, site-specific data, point of contacts lists, project milestones, and a general project overview. The individual benefits realized for the end user from each tool will also be covered. These details will be presented, balanced with a spotlight on communication as a critical component of any project management undertaking. Using today's technology, the web arguably provides the most cost and resource effective vehicle to facilitate the broad based, interactive sharing of project information.
Exploring the Usage of a Video Application Tool: Experiences in Film Studies
ERIC Educational Resources Information Center
Ali, Nazlena Mohamad; Smeaton, Alan F.
2011-01-01
This paper explores our experiences in deploying a video application tool in film studies, and its evaluation in terms of realistic contextual end-users who have real tasks to perform in a real environment. We demonstrate our experiences and core lesson learnt in deploying our novel movie browser application with undergraduate and graduate…
An ARM Mobile Facility Designed for Marine Deployments
NASA Astrophysics Data System (ADS)
Wiscombe, W. J.
2007-05-01
The U.S. Dept. of Energy's ARM (Atmospheric Radiation Measurements) Program is designing a Mobile Facility exclusively for marine deployments. This marine facility is patterned after ARM's land Mobile Facility, which had its inaugural deployment at Point Reyes, California, in 2005, followed by deployments to Niger in 2006 and Germany in 2007 (ongoing), and a planned deployment to China in 2008. These facilities are primarily intended for the study of clouds, radiation, aerosols, and surface processes with a goal to include these processes accurately in climate models. They are preferably embedded within larger field campaigns which provide context. They carry extensive instrumentation (in several large containers) including: cloud radar, lidar, microwave radiometers, infrared spectrometers, broadband and narrowband radiometers, sonde-launching facilities, extensive surface aerosol measurements, sky imagers, and surface latent and sensible heat flux devices. ARM's Mobile Facilities are designed for 6-10 month deployments in order to capture climatically-relevant datasets. They are available to any scientist, U.S. or international, who wishes to submit a proposal during the annual Spring call. The marine facility will be adapted to, and ruggedized for, the harsh marine environment and will add a scanning two-frequency radar, a boundary-layer wind profiler, a shortwave spectrometer, and aerosol instrumentation adapted to typical marine aerosols like sea salt. Plans also include the use of roving small UAVs, automated small boats, and undersea autonomous vehicles in order to address the point-to-area-average problem which is so crucial for informing climate models. Initial deployments are planned for small islands in climatically- interesting cloud regimes, followed by deployments on oceanic platforms (like decommissioned oil rigs and the quasi-permanent platform of this session's title) and eventually on large ships like car carriers plying routine routes.
An Overview of the Quality Function Deployment (QFD) Technique
NASA Technical Reports Server (NTRS)
Sherif, Josef S.; Tran, Tuyet-Lan
1995-01-01
QFD is a product planning tool and a process methodology that enables all organizations, departments, and individuals in a business or a project to systematically focus on the critical performance, functions, and/or characteristics of a product that are the most important to the customer. It is part of the Total Quality Management (TQM) concept.. This presentation describes the objectives of QFD, the process for implementing the technique, the benefits derived from proper implementation, the kinds of systems where QFD is best utilized, what the success factors are, how QFD works, some guidelines for selection of a QFD team, and the functional roles of key team members.
Hagland, Mark
2010-08-01
Not only are hospital, health system, and medical group ClOs and clinical informaticists deploying handheld mobile devices across their enterprises as clinical computing tools; clinicians, especially physicians, are increasingly bringing their own BlackBerrys, iPhones, iPads, Android devices, and other handhelds, into patient care organizations for their personal clinical use. Not surprisingly, the challenges--as well as the opportunities--are multilayered and complex, and include the strategic planning, infrastructure, clinician preference, clinician workflow, and security issues involved in the emerging mobile handheld revolution. The diversity of approaches among ClOs and other healthcare IT leaders on such issues is striking, and underscores the need for flexibility and nimbleness going forward.
Integrated Glass Coating Manufacturing Line
DOE Office of Scientific and Technical Information (OSTI.GOV)
Brophy, Brenor
2015-09-30
This project aims to enable US module manufacturers to coat glass with Enki’s state of the art tunable functionalized AR coatings at the lowest possible cost and highest possible performance by encapsulating Enki’s coating process in an integrated tool that facilitates effective process improvement through metrology and data analysis for greater quality and performance while reducing footprint, operating and capital costs. The Phase 1 objective was a fully designed manufacturing line, including fully specified equipment ready for issue of purchase requisitions; a detailed economic justification based on market prices at the end of Phase 1 and projected manufacturing costs andmore » a detailed deployment plan for the equipment.« less
Cognitive systems at the point of care: The CREDO program.
Fox, John
2017-04-01
CREDO is a framework for understanding human expertise and for designing and deploying systems that support cognitive tasks like situation and risk assessment, decision-making, therapy planning and workflow management. The framework has evolved through an extensive program of research on human decision-making and clinical practice. It draws on concepts from cognitive science, and has contributed new results to cognitive theory and understanding of human expertise and knowledge-based AI. These results are exploited in a suite of technologies for designing, implementing and deploying clinical services, early versions of which were reported by Das et al. (1997) [9] and Fox and Das (2000) [26]. A practical outcome of the CREDO program is a technology stack, a key element of which is an agent specification language (PROforma: Sutton and Fox (2003) [55]) which has proved to be a versatile tool for designing point of care applications in many clinical specialties and settings. Since software became available for implementing and deploying PROforma applications many kinds of services have been successfully built and trialed, some of which are in large-scale routine use. This retrospective describes the foundations of the CREDO model, summarizes the main theoretical, technical and clinical contributions, and discusses benefits of the cognitive approach. Crown Copyright © 2017. Published by Elsevier Inc. All rights reserved.
Patent Deployment Strategies and Patent Value in LED Industry
Wu, Ming-Fu; Chang, Keng-Wei; Zhou, Wei; Hao, Juan; Yuan, Chien-Chung; Chang, Ke-Chiun
2015-01-01
This study applies two variables in the measurement of company patent deployment strategies: patent family depth and earn plan ratio. Patent family depth represents the degree to which certain fields and markets are valued by the patent owner. Earn plan ratio defined as the ratio of the number of patent forward citations to patent family size. Earn plan ratio indicates the degree to which a patent family could be cited by later innovators and competitors. This study applies a logistic regression model in the analysis LED industry data. The results demonstrate that patent value has a positive relationship with the patent family depth, and earn plan ratio. PMID:26098313
Patent Deployment Strategies and Patent Value in LED Industry.
Wu, Ming-Fu; Chang, Keng-Wei; Zhou, Wei; Hao, Juan; Yuan, Chien-Chung; Chang, Ke-Chiun
2015-01-01
This study applies two variables in the measurement of company patent deployment strategies: patent family depth and earn plan ratio. Patent family depth represents the degree to which certain fields and markets are valued by the patent owner. Earn plan ratio defined as the ratio of the number of patent forward citations to patent family size. Earn plan ratio indicates the degree to which a patent family could be cited by later innovators and competitors. This study applies a logistic regression model in the analysis LED industry data. The results demonstrate that patent value has a positive relationship with the patent family depth, and earn plan ratio.
SU-E-T-218: The IHE-RO Helper Tool: Demonstrating the Connectivity Issues Solved by IHE-RO.
Kapoor, Rishabh; Yeung, Daniel; Kumar, Sabari Ajay; Alex, Daley; Kapur, Priyanka; Palta, Jatinder
2012-06-01
To develop a Web-based application (IHE-RO Helper) to allow comprehensive review of the interconnectivity and interoperability of various radiotherapy devices established through testing sanctioned by the Integrating Healthcare Enterprise-Radiation Oncology (IHE-RO). IHE-RO is an initiative sponsored by ASTRO to improve the way computer based systems in radiation oncology share information using well-defined data exchange standards (DICOM / HL7). At the IHE-RO Connectathon events over the last 4 years, 11 vendors with 14 different products have successfully tested and identified solutions to connectivity problems in treatment planning, simulation and delivery. Because the test results are highly technical, the interconnectivity issues amongst the RT devices may get overlooked by the end users. The IHE-RO helper tool is designed to operate in simple clinical terms with queries and presentations organized based on treatment techniques and clinical features that are familiar to the practitioners. For example, if you are planning to purchase a treatment planning system capable of generating plans (e.g. Stereotactic treatments) and are concerned whether the TPS can successfully transfer such data to your treatment management system (TMS) and subsequently to your treatment delivery system (TDS), the IHE-RO Helper can identify the connectivity requirements and list vendors that have successfully passed an IHE-RO Connectathon and validated their solution to the specific requirements. The IHE-RO helper tool provides a graphical and textual user interface to effectively demonstrate the solved interconnectivity problems between TPS, TMS and TDS. A report is also provided that explains the interconnectivity problems and its solutions. The IHE-RO helper is an effective tool to clearly identify vendor products that are IHE-RO compliant, thereby encourages vendor participation in testing and validation. Such a tool will be invaluable in procurement of new equipment to ensure a priori interoperability with anticipated RT devices deployed in the clinic. This research and development project is supported by the Bankhead-Coley Cancer Research Program grant # RC1-09BW-09-26833. © 2012 American Association of Physicists in Medicine.
NASA Astrophysics Data System (ADS)
Allgood, Glenn O.; Kuruganti, Phani Teja; Nutaro, James; Saffold, Jay
2009-05-01
Combat resiliency is the ability of a commander to prosecute, control, and consolidate his/her's sphere of influence in adverse and changing conditions. To support this, an infrastructure must exist that allows the commander to view the world in varying degrees of granularity with sufficient levels of detail to permit confidence estimates to be levied against decisions and course of actions. An infrastructure such as this will include the ability to effectively communicate context and relevance within and across the battle space. To achieve this will require careful thought, planning, and understanding of a network and its capacity limitations in post-event command and control. Relevance and impact on any existing infrastructure must be fully understood prior to deployment to exploit the system's full capacity and capabilities. In this view, the combat communication network is considered an integral part of or National communication network and infrastructure. This paper will describe an analytical tool set developed at ORNL and RNI incorporating complexity theory, advanced communications modeling, simulation, and visualization technologies that could be used as a pre-planning tool or post event reasoning application to support response and containment.
Evaluating a Clinical Decision Support Interface for End-of-Life Nurse Care.
Febretti, Alessandro; Stifter, Janet; Keenan, Gail M; Lopez, Karen D; Johnson, Andrew; Wilkie, Diana J
2014-01-01
Clinical Decision Support Systems (CDSS) are tools that assist healthcare personnel in the decision-making process for patient care. Although CDSSs have been successfully deployed in the clinical setting to assist physicians, few CDSS have been targeted at professional nurses, the largest group of health providers. We present our experience in designing and testing a CDSS interface embedded within a nurse care planning and documentation tool. We developed four prototypes based on different CDSS feature designs, and tested them in simulated end-of-life patient handoff sessions with a group of 40 nurse clinicians. We show how our prototypes directed nurses towards an optimal care decision that was rarely performed in unassisted practice. We also discuss the effect of CDSS layout and interface navigation in a nurse's acceptance of suggested actions. These findings provide insights into effective nursing CDSS design that are generalizable to care scenarios different than end-of-life.
Federal Register 2010, 2011, 2012, 2013, 2014
2012-11-21
...NMFS publishes regulations to implement Amendment 86 to the Fishery Management Plan for Groundfish of the Bering Sea and Aleutian Islands Management Area and Amendment 76 to the Fishery Management Plan for Groundfish of the Gulf of Alaska (Amendments 86/76). Amendments 86/ 76 add a funding and deployment system for observer coverage to the existing North Pacific Groundfish Observer Program (Observer Program) and amend existing observer coverage requirements for vessels and processing plants. The new funding and deployment system allows NMFS to determine when and where to deploy observers according to management and conservation needs, with funds provided through a system of fees based on the ex-vessel value of groundfish and halibut in fisheries covered by the new system. This action is necessary to resolve data quality and cost equity concerns with the Observer Program's existing funding and deployment structure. This action is intended to promote the goals and objectives of the Magnuson-Stevens Fishery Conservation and Management Act, the Northern Pacific Halibut Act of 1982, the fishery management plans, and other applicable law.
Managing design excellence tools during the development of new orthopaedic implants.
Défossez, Henri J P; Serhan, Hassan
2013-11-01
Design excellence (DEX) tools have been widely used for years in some industries for their potential to facilitate new product development. The medical sector, targeted by cost pressures, has therefore started adopting them. Numerous tools are available; however only appropriate deployment during the new product development stages can optimize the overall process. The primary study objectives were to describe generic tools and illustrate their implementation and management during the development of new orthopaedic implants, and compile a reference package. Secondary objectives were to present the DEX tool investment costs and savings, since the method can require significant resources for which companies must carefully plan. The publicly available DEX method "Define Measure Analyze Design Verify Validate" was adopted and implemented during the development of a new spinal implant. Several tools proved most successful at developing the correct product, addressing clinical needs, and increasing market penetration potential, while reducing design iterations and manufacturing validations. Cost analysis and Pugh Matrix coupled with multi generation planning enabled developing a strong rationale to activate the project, set the vision and goals. improved risk management and product map established a robust technical verification-validation program. Design of experiments and process quantification facilitated design for manufacturing of critical features, as early as the concept phase. Biomechanical testing with analysis of variance provided a validation model with a recognized statistical performance baseline. Within those tools, only certain ones required minimum resources (i.e., business case, multi generational plan, project value proposition, Pugh Matrix, critical To quality process validation techniques), while others required significant investments (i.e., voice of customer, product usage map, improved risk management, design of experiments, biomechanical testing techniques). All used techniques provided savings exceeding investment costs. Some other tools were considered and found less relevant. A matrix summarized the investment costs and generated estimated savings. Globally, all companies can benefit from using DEX by smartly selecting and estimating those tools with best return on investment at the start of the project. For this, a good understanding of the available company resources, background and development strategy are needed. In conclusion, it was possible to illustrate that appropriate management of design excellence tools can greatly facilitate the development of new orthopaedic implant systems.
Making vaccines "on demand": a potential solution for emerging pathogens and biodefense?
De Groot, Anne S; Einck, Leo; Moise, Leonard; Chambers, Michael; Ballantyne, John; Malone, Robert W; Ardito, Matthew; Martin, William
2013-09-01
The integrated US Public Health Emergency Medical Countermeasures Enterprise (PHEMCE) has made great strides in strategic preparedness and response capabilities. There have been numerous advances in planning, biothreat countermeasure development, licensure, manufacturing, stockpiling and deployment. Increased biodefense surveillance capability has dramatically improved, while new tools and increased awareness have fostered rapid identification of new potential public health pathogens. Unfortunately, structural delays in vaccine design, development, manufacture, clinical testing and licensure processes remain significant obstacles to an effective national biodefense rapid response capability. This is particularly true for the very real threat of "novel pathogens" such as the avian-origin influenzas H7N9 and H5N1, and new coronaviruses such as hCoV-EMC. Conventional approaches to vaccine development, production, clinical testing and licensure are incompatible with the prompt deployment needed for an effective public health response. An alternative approach, proposed here, is to apply computational vaccine design tools and rapid production technologies that now make it possible to engineer vaccines for novel emerging pathogen and WMD biowarfare agent countermeasures in record time. These new tools have the potential to significantly reduce the time needed to design string-of-epitope vaccines for previously unknown pathogens. The design process-from genome to gene sequence, ready to insert in a DNA plasmid-can now be accomplished in less than 24 h. While these vaccines are by no means "standard," the need for innovation in the vaccine design and production process is great. Should such vaccines be developed, their 60-d start-to-finish timeline would represent a 2-fold faster response than the current standard.
De Groot, Anne S; Einck, Leo; Moise, Leonard; Chambers, Michael; Ballantyne, John; Malone, Robert W; Ardito, Matthew; Martin, William
2013-01-01
The integrated US Public Health Emergency Medical Countermeasures Enterprise (PHEMCE) has made great strides in strategic preparedness and response capabilities. There have been numerous advances in planning, biothreat countermeasure development, licensure, manufacturing, stockpiling and deployment. Increased biodefense surveillance capability has dramatically improved, while new tools and increased awareness have fostered rapid identification of new potential public health pathogens. Unfortunately, structural delays in vaccine design, development, manufacture, clinical testing and licensure processes remain significant obstacles to an effective national biodefense rapid response capability. This is particularly true for the very real threat of “novel pathogens” such as the avian-origin influenzas H7N9 and H5N1, and new coronaviruses such as hCoV-EMC. Conventional approaches to vaccine development, production, clinical testing and licensure are incompatible with the prompt deployment needed for an effective public health response. An alternative approach, proposed here, is to apply computational vaccine design tools and rapid production technologies that now make it possible to engineer vaccines for novel emerging pathogen and WMD biowarfare agent countermeasures in record time. These new tools have the potential to significantly reduce the time needed to design string-of-epitope vaccines for previously unknown pathogens. The design process—from genome to gene sequence, ready to insert in a DNA plasmid—can now be accomplished in less than 24 h. While these vaccines are by no means “standard,” the need for innovation in the vaccine design and production process is great. Should such vaccines be developed, their 60-d start-to-finish timeline would represent a 2-fold faster response than the current standard. PMID:23877094
DOT National Transportation Integrated Search
1996-04-01
The purpose of this Intelligent Transportation System (ITS) Deployment Study is to identify : where and how ITS technologies can be applied to improve the safety, efficiency and capacity of : the Cleveland regional transportation network. The general...
Land mobile radio system phase II deployment report
DOT National Transportation Integrated Search
2007-12-28
In July 2004, the Alaska Department of Transportation and Public Facilities developed an integration methodology for Land Mobile Radio into the Departments Statewide Intelligent Transportation Systems Deployment Plan and the State Information Tech...
Statewide ITS development and deployment plan
DOT National Transportation Integrated Search
2002-10-01
This plan was developed to create a means to implement the ongoing, short-term and long-term activities identified in the Statewide ITS Action Plan. As part of the process for organizing the approximately seventy-five Action Plan activities, these we...
Corridor Planning And Feasibility Analysis Corridor, Master Plan
DOT National Transportation Integrated Search
1996-04-01
THE I-70 RURAL IVHS CORRIDOR MASTER PLAN IS THE GUIDANCE DOCUMENT FOR DEPLOYMENT OF THE INTELLIGENT TRANSPORTATION SYSTEM (ITS) FOR THE INTERSTATE-70 CORRIDOR FROM DENVER TO GLENWOOD SPRINGS, COLORADO. AS A WORKING DOCUMENT, THE PLAN RECOMMENDS STRAT...
Grand Forks/East Grand Forks ITS strategy plan
DOT National Transportation Integrated Search
2001-01-15
The Grand Forks/East Grand Forks (GF/EGF) Area's Intelligent Transportation Systems (ITS) Strategy Plan is an effort by the GF/EGF Metropolitan Planning Organization (MPO) and its partners to develop a plan for deploying Intelligent Transportation Sy...
Galileo mission planning for Low Gain Antenna based operations
NASA Technical Reports Server (NTRS)
Gershman, R.; Buxbaum, K. L.; Ludwinski, J. M.; Paczkowski, B. G.
1994-01-01
The Galileo mission operations concept is undergoing substantial redesign, necessitated by the deployment failure of the High Gain Antenna, while the spacecraft is on its way to Jupiter. The new design applies state-of-the-art technology and processes to increase the telemetry rate available through the Low Gain Antenna and to increase the information density of the telemetry. This paper describes the mission planning process being developed as part of this redesign. Principal topics include a brief description of the new mission concept and anticipated science return (these have been covered more extensively in earlier papers), identification of key drivers on the mission planning process, a description of the process and its implementation schedule, a discussion of the application of automated mission planning tool to the process, and a status report on mission planning work to date. Galileo enhancements include extensive reprogramming of on-board computers and substantial hard ware and software upgrades for the Deep Space Network (DSN). The principal mode of operation will be onboard recording of science data followed by extended playback periods. A variety of techniques will be used to compress and edit the data both before recording and during playback. A highly-compressed real-time science data stream will also be important. The telemetry rate will be increased using advanced coding techniques and advanced receivers. Galileo mission planning for orbital operations now involves partitioning of several scarce resources. Particularly difficult are division of the telemetry among the many users (eleven instruments, radio science, engineering monitoring, and navigation) and allocation of space on the tape recorder at each of the ten satellite encounters. The planning process is complicated by uncertainty in forecast performance of the DSN modifications and the non-deterministic nature of the new data compression schemes. Key mission planning steps include quantifying resource or capabilities to be allocated, prioritizing science observations and estimating resource needs for each, working inter-and intra-orbit trades of these resources among the Project elements, and planning real-time science activity. The first major mission planning activity, a high level, orbit-by-orbit allocation of resources among science objectives, has already been completed; and results are illustrated in the paper. To make efficient use of limited resources, Galileo mission planning will rely on automated mission planning tools capable of dealing with interactions among time-varying downlink capability, real-time science and engineering data transmission, and playback of recorded data. A new generic mission planning tool is being adapted for this purpose.
Galileo mission planning for Low Gain Antenna based operations
NASA Astrophysics Data System (ADS)
Gershman, R.; Buxbaum, K. L.; Ludwinski, J. M.; Paczkowski, B. G.
1994-11-01
The Galileo mission operations concept is undergoing substantial redesign, necessitated by the deployment failure of the High Gain Antenna, while the spacecraft is on its way to Jupiter. The new design applies state-of-the-art technology and processes to increase the telemetry rate available through the Low Gain Antenna and to increase the information density of the telemetry. This paper describes the mission planning process being developed as part of this redesign. Principal topics include a brief description of the new mission concept and anticipated science return (these have been covered more extensively in earlier papers), identification of key drivers on the mission planning process, a description of the process and its implementation schedule, a discussion of the application of automated mission planning tool to the process, and a status report on mission planning work to date. Galileo enhancements include extensive reprogramming of on-board computers and substantial hard ware and software upgrades for the Deep Space Network (DSN). The principal mode of operation will be onboard recording of science data followed by extended playback periods. A variety of techniques will be used to compress and edit the data both before recording and during playback. A highly-compressed real-time science data stream will also be important. The telemetry rate will be increased using advanced coding techniques and advanced receivers. Galileo mission planning for orbital operations now involves partitioning of several scarce resources. Particularly difficult are division of the telemetry among the many users (eleven instruments, radio science, engineering monitoring, and navigation) and allocation of space on the tape recorder at each of the ten satellite encounters. The planning process is complicated by uncertainty in forecast performance of the DSN modifications and the non-deterministic nature of the new data compression schemes. Key mission planning steps include quantifying resource or capabilities to be allocated, prioritizing science observations and estimating resource needs for each, working inter-and intra-orbit trades of these resources among the Project elements, and planning real-time science activity. The first major mission planning activity, a high level, orbit-by-orbit allocation of resources among science objectives, has already been completed; and results are illustrated in the paper. To make efficient use of limited resources, Galileo mission planning will rely on automated mission planning tools capable of dealing with interactions among time-varying downlink capability, real-time science and engineering data transmission, and playback of recorded data. A new generic mission planning tool is being adapted for this purpose.
Gewirtz, Abigail H.; Pinna, Keri L. M.; Hanson, Sheila K.; Brockberg, Dustin
2014-01-01
The high operational tempo of the current conflicts and the unprecedented reliance on National Guard and Reserve forces highlights the need for services to promote reintegration efforts for those transitioning back to civilian family life. Despite evidence that parenting has significant influence on children’s functioning, and that parenting may be impaired during stressful family transitions, there is a dearth of empirically-supported psychological interventions tailored for military families reintegrating after deployment. This paper reports on the modification of an empirically-supported parenting intervention for families in which a parent has deployed to war. A theoretical rationale for addressing parenting during reintegration after deployment is discussed. We describe the intervention, After Deployment, Adaptive Parenting Tools (ADAPT), and report early feasibility and acceptability data from a randomized controlled effectiveness trial of ADAPT, a 14-week group-based, web-enhanced parenting training program. Among the first 42 families assigned to the intervention group, participation rates were high, and equal among mothers and fathers. Satisfaction was high across all fourteen sessions. Implications for psychological services to military families dealing with the deployment process are discussed. PMID:24564441
USDOT guidance summary for connected vehicle deployments evaluation support.
DOT National Transportation Integrated Search
2016-07-01
The document provides guidance to Pilot Deployers in the timely and successful completion of Concept DevelopmentPhase deliverables, specifically in developing the Performance Measurement and Evaluation Support Plan in Task 5,identifying evaluation-su...
Code of Federal Regulations, 2013 CFR
2013-07-01
... Components and the Commandant of the U.S. Coast Guard shall plan to use as many retirees as necessary to meet... prescribed by the Secretary concerned as follows: (1) To fill shortages or to augment deployed or deploying...
Code of Federal Regulations, 2012 CFR
2012-07-01
... Components and the Commandant of the U.S. Coast Guard shall plan to use as many retirees as necessary to meet... prescribed by the Secretary concerned as follows: (1) To fill shortages or to augment deployed or deploying...
Code of Federal Regulations, 2011 CFR
2011-07-01
... Components and the Commandant of the U.S. Coast Guard shall plan to use as many retirees as necessary to meet... prescribed by the Secretary concerned as follows: (1) To fill shortages or to augment deployed or deploying...
Code of Federal Regulations, 2014 CFR
2014-07-01
... Components and the Commandant of the U.S. Coast Guard shall plan to use as many retirees as necessary to meet... prescribed by the Secretary concerned as follows: (1) To fill shortages or to augment deployed or deploying...
Code of Federal Regulations, 2010 CFR
2010-07-01
... Components and the Commandant of the U.S. Coast Guard shall plan to use as many retirees as necessary to meet... prescribed by the Secretary concerned as follows: (1) To fill shortages or to augment deployed or deploying...
Bringing your tools to CyVerse Discovery Environment using Docker
Devisetty, Upendra Kumar; Kennedy, Kathleen; Sarando, Paul; Merchant, Nirav; Lyons, Eric
2016-01-01
Docker has become a very popular container-based virtualization platform for software distribution that has revolutionized the way in which scientific software and software dependencies (software stacks) can be packaged, distributed, and deployed. Docker makes the complex and time-consuming installation procedures needed for scientific software a one-time process. Because it enables platform-independent installation, versioning of software environments, and easy redeployment and reproducibility, Docker is an ideal candidate for the deployment of identical software stacks on different compute environments such as XSEDE and Amazon AWS. CyVerse’s Discovery Environment also uses Docker for integrating its powerful, community-recommended software tools into CyVerse’s production environment for public use. This paper will help users bring their tools into CyVerse Discovery Environment (DE) which will not only allows users to integrate their tools with relative ease compared to the earlier method of tool deployment in DE but will also help users to share their apps with collaborators and release them for public use. PMID:27803802
Bringing your tools to CyVerse Discovery Environment using Docker.
Devisetty, Upendra Kumar; Kennedy, Kathleen; Sarando, Paul; Merchant, Nirav; Lyons, Eric
2016-01-01
Docker has become a very popular container-based virtualization platform for software distribution that has revolutionized the way in which scientific software and software dependencies (software stacks) can be packaged, distributed, and deployed. Docker makes the complex and time-consuming installation procedures needed for scientific software a one-time process. Because it enables platform-independent installation, versioning of software environments, and easy redeployment and reproducibility, Docker is an ideal candidate for the deployment of identical software stacks on different compute environments such as XSEDE and Amazon AWS. CyVerse's Discovery Environment also uses Docker for integrating its powerful, community-recommended software tools into CyVerse's production environment for public use. This paper will help users bring their tools into CyVerse Discovery Environment (DE) which will not only allows users to integrate their tools with relative ease compared to the earlier method of tool deployment in DE but will also help users to share their apps with collaborators and release them for public use.
Rao, Akshay; Elara, Mohan Rajesh; Elangovan, Karthikeyan
This paper aims to develop a local path planning algorithm for a bio-inspired, reconfigurable crawling robot. A detailed description of the robotic platform is first provided, and the suitability for deployment of each of the current state-of-the-art local path planners is analyzed after an extensive literature review. The Enhanced Vector Polar Histogram algorithm is described and reformulated to better fit the requirements of the platform. The algorithm is deployed on the robotic platform in crawling configuration and favorably compared with other state-of-the-art local path planning algorithms.
Rhode Island congestion management plan : executive summary
DOT National Transportation Integrated Search
1997-09-01
This document provides an overview of the Rhode Island Congestion Management System (CMS) program consisting of the following: Congestion Management System Plan; Incident Management Plan; and Intelligent Transportation System (ITS) Early Deployment P...
Posthuma, Leo; Wahlstrom, Emilia; Nijenhuis, René; Dijkens, Chris; de Zwart, Dick; van de Meent, Dik; Hollander, Anne; Brand, Ellen; den Hollander, Henri A; van Middelaar, Johan; van Dijk, Sander; Hall, E F; Hoffer, Sally
2014-11-01
The United Nations response mechanism to environmental emergencies requested a tool to support disaster assessment and coordination actions by United Nations Disaster Assessment and Coordination (UNDAC) teams. The tool should support on-site decision making when substantial chemical emissions affect human health directly or via the environment and should be suitable for prioritizing impact reduction management options under challenging conditions worldwide. To answer this need, the Flash Environmental Assessment Tool (FEAT) was developed and the scientific and practical underpinning and application of this tool are described in this paper. FEAT consists of a printed decision framework and lookup tables, generated by combining the scientific data on chemicals, exposure pathways and vulnerabilities with the pragmatic needs of emergency field teams. Application of the tool yields information that can help prioritize impact reduction measures. The first years of use illustrated the usefulness of the tool as well as suggesting additional uses and improvements. An additional use is application of the back-office tool (Hazard Identification Tool, HIT), the results of which aid decision-making by the authorities of affected countries and the preparation of field teams for on-site deployment. Another extra use is in disaster pro action and prevention. In this case, the application of the tool supports safe land-use planning and improved technical design of chemical facilities. UNDAC teams are trained to use the tool after large-scale sudden onset natural disasters. Copyright © 2014 Elsevier Ltd. All rights reserved.
Robustness via Run-Time Adaptation of Contingent Plans
NASA Technical Reports Server (NTRS)
Bresina, John L.; Washington, Richard; Norvig, Peter (Technical Monitor)
2000-01-01
In this paper, we discuss our approach to making the behavior of planetary rovers more robust for the purpose of increased productivity. Due to the inherent uncertainty in rover exploration, the traditional approach to rover control is conservative, limiting the autonomous operation of the rover and sacrificing performance for safety. Our objective is to increase the science productivity possible within a single uplink by allowing the rover's behavior to be specified with flexible, contingent plans and by employing dynamic plan adaptation during execution. We have deployed a system exhibiting flexible, contingent execution; this paper concentrates on our ongoing efforts on plan adaptation, Plans can be revised in two ways: plan steps may be deleted, with execution continuing with the plan suffix; and the current plan may be merged with an "alternate plan" from an on-board library. The plan revision action is chosen to maximize the expected utility of the plan. Plan merging and action deletion constitute a more conservative general-purpose planning system; in return, our approach is more efficient and more easily verified, two important criteria for deployed rovers.
Intelligent video storage of visual evidences on site in fast deployment
NASA Astrophysics Data System (ADS)
Desurmont, Xavier; Bastide, Arnaud; Delaigle, Jean-Francois
2004-07-01
In this article we present a generic, flexible, scalable and robust approach for an intelligent real-time forensic visual system. The proposed implementation could be rapidly deployable and integrates minimum logistic support as it embeds low complexity devices (PCs and cameras) that communicate through wireless network. The goal of these advanced tools is to provide intelligent video storage of potential video evidences for fast intervention during deployment around a hazardous sector after a terrorism attack, a disaster, an air crash or before attempt of it. Advanced video analysis tools, such as segmentation and tracking are provided to support intelligent storage and annotation.
Large Scale eHealth Deployment in Europe: Insights from Concurrent Use of Standards.
Eichelberg, Marco; Chronaki, Catherine
2016-01-01
Large-scale eHealth deployment projects face a major challenge when called to select the right set of standards and tools to achieve sustainable interoperability in an ecosystem including both legacy systems and new systems reflecting technological trends and progress. There is not a single standard that would cover all needs of an eHealth project, and there is a multitude of overlapping and perhaps competing standards that can be employed to define document formats, terminology, communication protocols mirroring alternative technical approaches and schools of thought. eHealth projects need to respond to the important question of how alternative or inconsistently implemented standards and specifications can be used to ensure practical interoperability and long-term sustainability in large scale eHealth deployment. In the eStandards project, 19 European case studies reporting from R&D and large-scale eHealth deployment and policy projects were analyzed. Although this study is not exhaustive, reflecting on the concepts, standards, and tools for concurrent use and the successes, failures, and lessons learned, this paper offers practical insights on how eHealth deployment projects can make the most of the available eHealth standards and tools and how standards and profile developing organizations can serve the users embracing sustainability and technical innovation.
Perceived effect of deployment on families of UK military personnel.
Thandi, G; Greenberg, N; Fear, N T; Jones, N
2017-10-01
In the UK, little is known about the perceived effects of deployment, on military families, from military personnel in theatre. To investigate military personnel's perceptions of the impact of deployment on intimate relationships and children. Deployed service personnel who were in a relationship, and who had children, completed a survey while deployed on combat operations. Data were taken from four mental health surveys carried out in Iraq in 2009 and Afghanistan in 2010, 2011 and 2014. Among 4265 participants, after adjusting for military and social-demographic covariates, perceiving that deployment had a negative impact on intimate relationships and children was associated with psychological distress, and traumatic stress symptoms. Military personnel who reported being in danger of being injured or killed during deployment, were more likely to report a perceived negative effect of deployment on their intimate relationships. Reservists were less likely to report a perceived negative impact of deployment on their children compared with regulars. Military personnel who themselves planned to separate from their partner were more likely to report psychological distress, and stressors at home. Perceived insufficient support from the Ministry of Defence was associated with poor mental health, and holding a junior rank. Deployed UK military personnel with symptoms of psychological distress, who experienced stressors at home, were especially likely to perceive that their family were inadequately supported by the military. Those planning to separate from their partner were at increased risk of suffering with mental health problems while deployed. © The Author 2017. Published by Oxford University Press on behalf of the Society of Occupational Medicine. All rights reserved. For Permissions, please email: journals.permissions@oup.com
Do PEV Drivers Park Near Publicly Accessible EVSE in San Diego but Not Use Them?
DOE Office of Scientific and Technical Information (OSTI.GOV)
Francfort, James Edward
The PEV charging stations deployed as part of The EV Project included both residential and non-residential sites. Non-residential sites included EVSE installed in workplace environments, fleet applications and those that were publicly accessible near retail centers, parking lots, and similar locations. The EV Project utilized its Micro-Climate® planning process to determine potential sites for publicly accessible EVSE in San Diego. This process worked with local stakeholders to target EVSE deployment near areas where significant PEV traffic and parking was expected. This planning process is described in The Micro-Climate deployment Process in San Diego1. The EV Project issued its deployment planmore » for San Diego in November 2010, prior to the sale of PEVs by Nissan and Chevrolet. The Project deployed residential EVSE concurrent with vehicle delivery starting in December 2010. The installation of non-residential EVSE commenced in April 2011 consistent with the original Project schedule, closely following the adoption of PEVs. The residential participation portion of The EV Project was fully subscribed by January 2013 and the non-residential EVSE deployment was essentially completed by August 2013.« less
Deployment strategies of managed lanes on arterials.
DOT National Transportation Integrated Search
2015-02-01
This report investigates issues related to planning, financing, deployment, and operation of managed : lanes on arterials. In this report, a strategy for managed lanes refers to a combination of the managed : lane type, the design and implementation,...
Minerva: User-Centered Science Operations Software Capability for Future Human Exploration
NASA Technical Reports Server (NTRS)
Deans, Matthew; Marquez, Jessica J.; Cohen, Tamar; Miller, Matthew J.; Deliz, Ivonne; Hillenius, Steven; Hoffman, Jeffrey; Lee, Yeon Jin; Lees, David; Norheim, Johannes;
2017-01-01
In June of 2016, the Biologic Analog Science Associated with Lava Terrains (BASALT) research project conducted its first field deployment, which we call BASALT-1. BASALT-1 consisted of a science-driven field campaign in a volcanic field in Idaho as a simulated human mission to Mars. Scientists and mission operators were provided a suite of ground software tools that we refer to collectively as Minerva to carry out their work. Minerva provides capabilities for traverse planning and route optimization, timeline generation and display, procedure management, execution monitoring, data archiving, visualization, and search. This paper describes the Minerva architecture, constituent components, use cases, and some preliminary findings from the BASALT-1 campaign.
Integrated Budget Office Toolbox
NASA Technical Reports Server (NTRS)
Rushing, Douglas A.; Blakeley, Chris; Chapman, Gerry; Robertson, Bill; Horton, Allison; Besser, Thomas; McCarthy, Debbie
2010-01-01
The Integrated Budget Office Toolbox (IBOT) combines budgeting, resource allocation, organizational funding, and reporting features in an automated, integrated tool that provides data from a single source for Johnson Space Center (JSC) personnel. Using a common interface, concurrent users can utilize the data without compromising its integrity. IBOT tracks planning changes and updates throughout the year using both phasing and POP-related (program-operating-plan-related) budget information for the current year, and up to six years out. Separating lump-sum funds received from HQ (Headquarters) into separate labor, travel, procurement, Center G&A (general & administrative), and servicepool categories, IBOT creates a script that significantly reduces manual input time. IBOT also manages the movement of travel and procurement funds down to the organizational level and, using its integrated funds management feature, helps better track funding at lower levels. Third-party software is used to create integrated reports in IBOT that can be generated for plans, actuals, funds received, and other combinations of data that are currently maintained in the centralized format. Based on Microsoft SQL, IBOT incorporates generic budget processes, is transportable, and is economical to deploy and support.
Cooperative fuzzy games approach to setting target levels of ECs in quality function deployment.
Yang, Zhihui; Chen, Yizeng; Yin, Yunqiang
2014-01-01
Quality function deployment (QFD) can provide a means of translating customer requirements (CRs) into engineering characteristics (ECs) for each stage of product development and production. The main objective of QFD-based product planning is to determine the target levels of ECs for a new product or service. QFD is a breakthrough tool which can effectively reduce the gap between CRs and a new product/service. Even though there are conflicts among some ECs, the objective of developing new product is to maximize the overall customer satisfaction. Therefore, there may be room for cooperation among ECs. A cooperative game framework combined with fuzzy set theory is developed to determine the target levels of the ECs in QFD. The key to develop the model is the formulation of the bargaining function. In the proposed methodology, the players are viewed as the membership functions of ECs to formulate the bargaining function. The solution for the proposed model is Pareto-optimal. An illustrated example is cited to demonstrate the application and performance of the proposed approach.
Automating Mid- and Long-Range Scheduling for the NASA Deep Space Network
NASA Technical Reports Server (NTRS)
Johnston, Mark D.; Tran, Daniel
2012-01-01
NASA has recently deployed a new mid-range scheduling system for the antennas of the Deep Space Network (DSN), called Service Scheduling Software, or S(sup 3). This system was designed and deployed as a modern web application containing a central scheduling database integrated with a collaborative environment, exploiting the same technologies as social web applications but applied to a space operations context. This is highly relevant to the DSN domain since the network schedule of operations is developed in a peer-to-peer negotiation process among all users of the DSN. These users represent not only NASA's deep space missions, but also international partners and ground-based science and calibration users. The initial implementation of S(sup 3) is complete and the system has been operational since July 2011. This paper describes some key aspects of the S(sup 3) system and on the challenges of modeling complex scheduling requirements and the ongoing extension of S(sup 3) to encompass long-range planning, downtime analysis, and forecasting, as the next step in developing a single integrated DSN scheduling tool suite to cover all time ranges.
Cooperative Fuzzy Games Approach to Setting Target Levels of ECs in Quality Function Deployment
Yang, Zhihui; Chen, Yizeng; Yin, Yunqiang
2014-01-01
Quality function deployment (QFD) can provide a means of translating customer requirements (CRs) into engineering characteristics (ECs) for each stage of product development and production. The main objective of QFD-based product planning is to determine the target levels of ECs for a new product or service. QFD is a breakthrough tool which can effectively reduce the gap between CRs and a new product/service. Even though there are conflicts among some ECs, the objective of developing new product is to maximize the overall customer satisfaction. Therefore, there may be room for cooperation among ECs. A cooperative game framework combined with fuzzy set theory is developed to determine the target levels of the ECs in QFD. The key to develop the model is the formulation of the bargaining function. In the proposed methodology, the players are viewed as the membership functions of ECs to formulate the bargaining function. The solution for the proposed model is Pareto-optimal. An illustrated example is cited to demonstrate the application and performance of the proposed approach. PMID:25097884
NASA Technical Reports Server (NTRS)
Antonille, Scott R.; Miskey, Cherie L.; Ohl, Raymond G.; Rohrbach, Scott O.; Aronstein, David L.; Bartoszyk, Andrew E.; Bowers, Charles W.; Cofie, Emmanuel; Collins, Nicholas R.; Comber, Brian J.;
2016-01-01
NASA's James Webb Space Telescope (JWST) is a 6.6m diameter, segmented, deployable telescope for cryogenic IR space astronomy (40K). The JWST Observatory includes the Optical Telescope Element (OTE) and the Integrated Science Instrument Module (ISIM) that contains four science instruments (SI) and the fine guider. The SIs are mounted to a composite metering structure. The SI and guider units were integrated to the ISIM structure and optically tested at the NASA Goddard Space Flight Center as a suite using the Optical Telescope Element SIMulator (OSIM). OSIM is a full field, cryogenic JWST telescope simulator. SI performance, including alignment and wave front error, were evaluated using OSIM. We describe test and analysis methods for optical performance verification of the ISIM Element, with an emphasis on the processes used to plan and execute the test. The complexity of ISIM and OSIM drove us to develop a software tool for test planning that allows for configuration control of observations, associated scripts, and management of hardware and software limits and constraints, as well as tools for rapid data evaluation, and flexible re-planning in response to the unexpected. As examples of our test and analysis approach, we discuss how factors such as the ground test thermal environment are compensated in alignment. We describe how these innovative methods for test planning and execution and post-test analysis were instrumental in the verification program for the ISIM element, with enough information to allow the reader to consider these innovations and lessons learned in this successful effort in their future testing for other programs.
NASA Astrophysics Data System (ADS)
Antonille, Scott R.; Miskey, Cherie L.; Ohl, Raymond G.; Rohrbach, Scott O.; Aronstein, David L.; Bartoszyk, Andrew E.; Bowers, Charles W.; Cofie, Emmanuel; Collins, Nicholas R.; Comber, Brian J.; Eichhorn, William L.; Glasse, Alistair C.; Gracey, Renee; Hartig, George F.; Howard, Joseph M.; Kelly, Douglas M.; Kimble, Randy A.; Kirk, Jeffrey R.; Kubalak, David A.; Landsman, Wayne B.; Lindler, Don J.; Malumuth, Eliot M.; Maszkiewicz, Michael; Rieke, Marcia J.; Rowlands, Neil; Sabatke, Derek S.; Smith, Corbett T.; Smith, J. Scott; Sullivan, Joseph F.; Telfer, Randal C.; Te Plate, Maurice; Vila, M. Begoña.; Warner, Gerry D.; Wright, David; Wright, Raymond H.; Zhou, Julia; Zielinski, Thomas P.
2016-09-01
NASA's James Webb Space Telescope (JWST) is a 6.5m diameter, segmented, deployable telescope for cryogenic IR space astronomy. The JWST Observatory includes the Optical Telescope Element (OTE) and the Integrated Science Instrument Module (ISIM), that contains four science instruments (SI) and the Fine Guidance Sensor (FGS). The SIs are mounted to a composite metering structure. The SIs and FGS were integrated to the ISIM structure and optically tested at NASA's Goddard Space Flight Center using the Optical Telescope Element SIMulator (OSIM). OSIM is a full-field, cryogenic JWST telescope simulator. SI performance, including alignment and wavefront error, was evaluated using OSIM. We describe test and analysis methods for optical performance verification of the ISIM Element, with an emphasis on the processes used to plan and execute the test. The complexity of ISIM and OSIM drove us to develop a software tool for test planning that allows for configuration control of observations, implementation of associated scripts, and management of hardware and software limits and constraints, as well as tools for rapid data evaluation, and flexible re-planning in response to the unexpected. As examples of our test and analysis approach, we discuss how factors such as the ground test thermal environment are compensated in alignment. We describe how these innovative methods for test planning and execution and post-test analysis were instrumental in the verification program for the ISIM element, with enough information to allow the reader to consider these innovations and lessons learned in this successful effort in their future testing for other programs.
COBE On-Orbit Engineering Performance, volume 1
NASA Technical Reports Server (NTRS)
1990-01-01
The Cosmic Background Explorer (COBE) was successfully launched on Nov. 18, 1989. The Delta Launch Vehicle performed flawlessly, and observatory deployments occurred as planned. The dewar cover successfully deployed on day 4, as planned, and the cryogen temperature is currently at 1.41 K. All three instruments are operating and acquiring science data, and the Payload Operational Control Center (POCC)/Network support has been excellent. Various performance aspects of the COBE are presented in view graph form.
From EGEE Operations Portal towards EGI Operations Portal
NASA Astrophysics Data System (ADS)
Cordier, Hélène; L'Orphelin, Cyril; Reynaud, Sylvain; Lequeux, Olivier; Loikkanen, Sinikka; Veyre, Pierre
Grid operators in EGEE have been using a dedicated dashboard as their central operational tool, stable and scalable for the last 5 years despite continuous upgrade from specifications by users, monitoring tools or data providers. In EGEE-III, recent regionalisation of operations led the Operations Portal developers to conceive a standalone instance of this tool. We will see how the dashboard reorganization paved the way for the re-engineering of the portal itself. The outcome is an easily deployable package customized with relevant information sources and specific decentralized operational requirements. This package is composed of a generic and scalable data access mechanism, Lavoisier; a renowned php framework for configuration flexibility, Symfony and a MySQL database. VO life cycle and operational information, EGEE broadcast and Downtime notifications are next for the major reorganization until all other key features of the Operations Portal are migrated to the framework. Features specifications will be sketched at the same time to adapt to EGI requirements and to upgrade. Future work on feature regionalisation, on new advanced features or strategy planning will be tracked in EGI- Inspire through the Operations Tools Advisory Group, OTAG, where all users, customers and third parties of the Operations Portal are represented from January 2010.
DOT National Transportation Integrated Search
1997-01-01
Intelligent transportation systems (ITS) are systems that utilize advanced technologies, including computer, communications and process control technologies, to improve the efficiency and safety of the transportation system. These systems encompass a...
Deploying weigh-in-motion installations on asphalt concrete pavements.
DOT National Transportation Integrated Search
2010-02-01
The strategic plan for establishing a vehicle weight monitoring net across Texas calls for deploying two : technology types piezoelectric and bending plate systems, and seeks to install weigh-in-motion (WIM) : systems in roadways that are under n...
Alternative Fuels Data Center: Ohio Transportation Data for Alternative
Sustainable Fleet Plan into On-Road Reality Jan. 26, 2016 Video thumbnail for Smith Dairy Deploys Natural Gas Vehicles and Fueling Infrastructure in the Midwest Smith Dairy Deploys Natural Gas Vehicles and Fueling
2012 Eco-Logical grant program annual report
DOT National Transportation Integrated Search
2000-01-01
What is IDAS? IDAS, which stands for the ITS Deployment Analysis System, is software developed by the Federal Highway Administration that can be used to perform sketch planning analysis for ITS deployments. Planners and others can use IDAS to calcula...
AN ADVANCED TOOL FOR APPLIED INTEGRATED SAFETY MANAGEMENT
DOE Office of Scientific and Technical Information (OSTI.GOV)
Potts, T. Todd; Hylko, James M.; Douglas, Terence A.
2003-02-27
WESKEM, LLC's Environmental, Safety and Health (ES&H) Department had previously assessed that a lack of consistency, poor communication and using antiquated communication tools could result in varying operating practices, as well as a failure to capture and disseminate appropriate Integrated Safety Management (ISM) information. To address these issues, the ES&H Department established an Activity Hazard Review (AHR)/Activity Hazard Analysis (AHA) process for systematically identifying, assessing, and controlling hazards associated with project work activities during work planning and execution. Depending on the scope of a project, information from field walkdowns and table-top meetings are collected on an AHR form. The AHAmore » then documents the potential failure and consequence scenarios for a particular hazard. Also, the AHA recommends whether the type of mitigation appears appropriate or whether additional controls should be implemented. Since the application is web based, the information is captured into a single system and organized according to the >200 work activities already recorded in the database. Using the streamlined AHA method improved cycle time from over four hours to an average of one hour, allowing more time to analyze unique hazards and develop appropriate controls. Also, the enhanced configuration control created a readily available AHA library to research and utilize along with standardizing hazard analysis and control selection across four separate work sites located in Kentucky and Tennessee. The AHR/AHA system provides an applied example of how the ISM concept evolved into a standardized field-deployed tool yielding considerable efficiency gains in project planning and resource utilization. Employee safety is preserved through detailed planning that now requires only a portion of the time previously necessary. The available resources can then be applied to implementing appropriate engineering, administrative and personal protective equipment controls in the field.« less
A Comprehensive Planning Model.
ERIC Educational Resources Information Center
Rieley, James B.
The key to long-term institutional effectiveness is a comprehensive planning process that identifies a few vital goals that can be measured by an institution. Effective strategic planning involves five key elements: process-based planning, a systemic approach, integration with the budget process, an effective deployment process, and appropriate…
DOT National Transportation Integrated Search
2016-02-08
Professional development and training are essential to the incorporation of connected/automated vehicles (C/AV) into the transportation planning process. In order to guarantee a successful deployment, transportation planning agencies and their stakeh...
Experiences with a Decade of Wireless Sensor Networks in Mountain Cryosphere Research
NASA Astrophysics Data System (ADS)
Beutel, Jan
2017-04-01
Research in geoscience depends on high-quality measurements over long periods of time in order to understand processes and to create and validate models. The promise of wireless sensor networks to monitor autonomously at unprecedented spatial and temporal scale motivated the use of this novel technology for studying mountain permafrost in the mid 2000s. Starting from a first experimental deployment to investigate the thermal properties of steep bedrock permafrost in 2006 on the Jungfraujoch, Switzerland at 3500 m asl using prototype wireless sensors the PermaSense project has evolved into a multi-site and multi-discipline initiative. We develop, deploy and operate wireless sensing systems customized for long-term autonomous operation in high-mountain environments. Around this central element, we develop concepts, methods and tools to investigate and to quantify the connection between climate, cryosphere (permafrost, glaciers, snow) and geomorphodynamics. In this presentation, we describe the concepts and system architecture used both for the wireless sensor network as well as for data management and processing. Furthermore, we will discuss the experience gained in over a decade of planning, installing and operating large deployments on field sites spread across a large part of the Swiss and French Alps and applications ranging from academic, experimental research campaigns, long-term monitoring and natural hazard warning in collaboration with government authorities and local industry partners. Reference http://www.permasense.ch Online Open Data Access http://data.permasense.ch
Tethered Satellite System (TSS-1R)-Post Flight (STS-75) Engineering Performance Report
NASA Technical Reports Server (NTRS)
Lavoie, Anthony R.
1996-01-01
The first mission of the Tethered Satellite deployer was flown onboard Atlantis in 1992 during the Space Transportation System (STS) flight STS-46. Due to a mechanical interference with the level wind mechanism the satellite was only Deployed to 256 m rather than the planned 20,000 m. Other problems were also experienced during the STS-46 flight and several modifications were made to the Deployer and Satellite. STS-75 was a reflight of the Tethered Satellite System 1 (TSS-1) designated as Tethered Satellite System 1 Reflight (TSS-1 R) onboard Columbia. As on STS-46, the TSS payload consisted of the Deployer, the Satellite, 3 cargo bay mounted experiments: Shuttle Electrodynamic Tether System (SETS), Shuttle Potential and Return Electron Experiment (SPREE), Deployer Core Equipment (DCORE) 4 Satellite mounted experiments: Research on Electrodynamics Tether Effects (RETE), Research on Orbital Plasma Electrodynamics (ROPE), Satellite Core Instruments (SCORE), Tether Magnetic Field Experiment (TEMAG) and an aft flight deck camera: Tether Optical Phenomena Experiment (TOP). Following successful pre-launch, launch and pre-deployment orbital operations, the Deployer deployed the Tethered Satellite to 19,695 m at which point the tether broke within the Satellite Deployment Boom (SDB). The planned length for On-Station I (OST1) was 20,700 m The Satellite flew away from the Orbiter with the tether attached. The satellite was "safed" and placed in a limited power mode via the RF link. The Satellite was contacted periodically during overflights of ground stations. Cargo bay science activities continued for the period of time allocated to TSS-1 R operations.
ART-Ada design project, phase 2
NASA Technical Reports Server (NTRS)
Lee, S. Daniel; Allen, Bradley P.
1990-01-01
Interest in deploying expert systems in Ada has increased. An Ada based expert system tool is described called ART-Ada, which was built to support research into the language and methodological issues of expert systems in Ada. ART-Ada allows applications of an existing expert system tool called ART-IM (Automated Reasoning Tool for Information Management) to be deployed in various Ada environments. ART-IM, a C-based expert system tool, is used to generate Ada source code which is compiled and linked with an Ada based inference engine to produce an Ada executable image. ART-Ada is being used to implement several expert systems for NASA's Space Station Freedom Program and the U.S. Air Force.
Metropolitan ITS deployment tracking : extract of data on traffic signals
DOT National Transportation Integrated Search
2000-03-01
Metropolitan deployment tracking uses surveys targeted at state county, and local agencies within the metropolitan planning boundary for 78 of the largest metropolitan areas. Data were gathered in this manner in 1997 and these data were updated in 19...
CV pilot deployment concept phase 1, outreach plan — ICF Wyoming.
DOT National Transportation Integrated Search
2016-06-24
The Wyoming Department of Transportations (WYDOT) Connected Vehicle (CV) Pilot Deployment Program is intended to develop a suite of applications that utilize vehicle to infrastructure (V2I) and vehicle to vehicle (V2V) communication technology to ...
Connected vehicle pilot deployment program phase 2, data management plan - Wyoming
DOT National Transportation Integrated Search
2017-04-10
The Wyoming Department of Transportations (WYDOT) Connected Vehicle (CV) Pilot Deployment Program is intended to develop a suite of applications that utilize vehicle to infrastructure (V2I) and vehicle to vehicle (V2V) communication technology to ...
Gewirtz, Abigail H; Pinna, Keri L M; Hanson, Sheila K; Brockberg, Dustin
2014-02-01
The high operational tempo of the current conflicts and the unprecedented reliance on National Guard and Reserve forces highlights the need for services to promote reintegration efforts for those transitioning back to civilian family life. Despite evidence that parenting has significant influence on children's functioning, and that parenting may be impaired during stressful family transitions, there is a dearth of empirically supported psychological interventions tailored for military families reintegrating after deployment. This article reports on the modification of an empirically supported parenting intervention for families in which a parent has deployed to war. A theoretical rationale for addressing parenting during reintegration after deployment is discussed. We describe the intervention, After Deployment, Adaptive Parenting Tools (ADAPT), and report early feasibility and acceptability data from a randomized controlled effectiveness trial of ADAPT, a 14-week group-based, Web-enhanced parenting training program. Among the first 42 families assigned to the intervention group, participation rates were high, and equal among mothers and fathers. Satisfaction was high across all 14 sessions. Implications for psychological services to military families dealing with the deployment process are discussed. PsycINFO Database Record (c) 2014 APA, all rights reserved.
Strategic planning processes and financial performance among hospitals in Lebanon.
Saleh, Shadi; Kaissi, Amer; Semaan, Adele; Natafgi, Nabil Maher
2013-01-01
Strategic planning has been presented as a valuable management tool. However, evidence of its deployment in healthcare and its effect on organizational performance is limited in low-income and middle-income countries (LMICs). The study aimed to explore the use of strategic planning processes in Lebanese hospitals and to investigate its association with financial performance. The study comprised 79 hospitals and assessed occupancy rate (OR) and revenue-per-bed (RPB) as performance measures. The strategic planning process included six domains: having a plan, plan development, plan implementation, responsibility of planning activities, governing board involvement, and physicians' involvement. Approximately 90% of hospitals have strategic plans that are moderately developed (mean score of 4.9 on a 1-7 scale) and implemented (score of 4.8). In 46% of the hospitals, the CEO has the responsibility for the plan. The level of governing board involvement in the process is moderate to high (score of 5.1), whereas physician involvement is lower (score of 4.1). The OR and RPB amounted to respectively 70% and 59 304 among hospitals with a strategic plan as compared with 62% and 33 564 for those lacking such a plan. No statistical association between having a strategic plan and either of the two measures was detected. However, the findings revealed that among hospitals that had a strategic plan, higher implementation levels were associated with lower OR (p < 0.05). In an LMIC healthcare environment characterized by resource limitation, complexity, and political and economic volatility, flexibility rather than rigid plans allow organizations to better cope with environmental turbulence. Copyright © 2012 John Wiley & Sons, Ltd.
Truck size and weight enforcement technologies : implementation plan
DOT National Transportation Integrated Search
2009-06-01
The purpose of this Implementation Plan is to recommend strategies to encourage the deployment of roadside technologies to improve truck size and weight enforcement in the United States. The plan includes strategies that State practitioners can use t...
Road weather information system statewide implementation plan.
DOT National Transportation Integrated Search
2014-03-01
The objective of this project was to develop a plan for deploying a statewide RWIS to support both current NYSDOT operations and future MDSS applications. To develop the plan, various information and data sources were investigated, including the curr...
Automated Support for Rapid Coordination of Joint UUV Operation
2015-03-01
automata , dead-reckoning, static plan, nmtime plan, rapid deployment, GPS 17. SECURITY CLASSIFICATION OF REPORT Unclassified 18. SECURITY...STATE MACHINES, MOORE AUTOMATA ..........................................9 A. MOORE AUTOMATA ...9 B. UUV PLANS AS MOORE AUTOMATA ...................................................11 C. SAMPLING RATE
Medical support to military airborne training and operations.
Starkey, Kerry J; Lyon, J; Sigman, E; Pynn, H J; Nordmann, G
2018-05-01
Airborne operations enable large numbers of military forces to deploy on the ground in the shortest possible time. This however must be balanced by an increased risk of injury. The aim of this paper is to review the current UK military drop zone medical estimate process, which may help to predict the risk of potential injury and assist in planning appropriate levels of medical support. In spring 2015, a British Airborne Battlegroup (UKBG) deployed on a 7-week overseas interoperability training exercise in the USA with their American counterparts (USBG). This culminated in a 7-day Combined Joint Operations Access Exercise, which began with an airborne Joint Forcible Entry (JFE) of approximately 2100 paratroopers.The predicted number of jump-related injuries was estimated using Parachute Order Number 8 (PO No 8). Such injuries were defined as injuries occurring from the time the paratrooper exited the aircraft until they released their parachute harness on the ground. Overall, a total of 53 (2.5%) casualties occurred in the JFE phase of the exercise, lower than the predicted number of 168 (8%) using the PO No 8 tool. There was a higher incidence of back (30% actual vs 20% estimated) and head injuries (21% actual vs 5% estimated) than predicted with PO No 8. The current method for predicting the incidence of medical injuries after a parachute drop using the PO No 8 tool is potentially not accurate enough for current requirements. Further research into injury rate, influencing factors and injury type are urgently required in order to provide an evidence base to ensure optimal medical logistical and clinical planning for airborne training and operations in the future. © Article author(s) (or their employer(s) unless otherwise stated in the text of the article) 2018. All rights reserved. No commercial use is permitted unless otherwise expressly granted.
NASA Astrophysics Data System (ADS)
Sousa, J. T.; Pinto, J.; Martins, R.; Costa, M.; Ferreira, F.; Gomes, R.
2014-12-01
The problem of developing mobile oceanographic and atmospheric observation networks (MOAO) with coordinated air and ocean vehicles is discussed in the framework of the communications and control software tool chain developed at Underwater Systems and Technologies Laboratory (LSTS) from Porto University. This is done with reference to field experiments to illustrate key capabilities and to assess future MOAO operations. First, the motivation for building MOAO by "composition" of air and ocean vehicles, communication networks, and planning and execution control frameworks is discussed - in networked vehicle systems information and commands are exchanged among multiple vehicles and operators, and the roles, relative positions, and dependencies of these vehicles and operators change during operations. Second, the planning and execution control framework developed at LSTS for multi-vehicle systems is discussed with reference to key concepts such as autonomy, mixed-initiative interactions, and layered organization. Third, the LSTS tool software tool chain is presented to show how to develop MOAO by composition. The tool chain comprises the Neptus command and control framework for mixed initiative interactions, the underlying IMC messaging protocol, and the DUNE on-board software. Fourth, selected LSTS operational deployments illustrate MOAO capability building. In 2012 we demonstrated the use of UAS to "ferry" data from UUVs located beyond line of sight (BLOS). In 2013 we demonstrated coordinated observations of coastal fronts with small UAS and UUVs, "bent" BLOS through the use of UAS as communication relays, and UAS tracking of juvenile hammer-head sharks. In 2014 we demonstrated UUV adaptive sampling with the closed loop controller of the UUV residing on a UAS; this was done with the help of a Wave Glider ASV with a communications gateway. The results from these experiments provide a background for assessing potential future UAS operations in a compositional MOAO.
on how to understand and plan for transportation advancements, including the increasing deployment of topics: Transportation electrification and the infrastructure necessary to support the increasing increasing deployment of these technologies; Impact of on-demand transit and mobility services on public
Connected vehicle pilot deployment program phase 2, data privacy plan – Wyoming.
DOT National Transportation Integrated Search
2016-04-14
The Wyoming Department of Transportations (WYDOT) Connected Vehicle (CV) Pilot Deployment Program is intended to develop a suite of applications that utilize vehicle to infrastructure (V2I) and vehicle to vehicle (V2V) communication technology to ...
DOT National Transportation Integrated Search
1999-11-08
In 1996, the Federal Highway Administration awarded a Model Deployment Initiative grant to the Phoenix Metropolitan Area to assist in the deployment and integration of a model Intelligent Transportation System (ITS). Using funding from both the feder...
DOT National Transportation Integrated Search
2000-01-01
This report demonstrates the benefits and potential pitfalls of deploying and operating an integrated freeway and arterial management system. In particular, it discusses the lessons learned about the Medical Center Corridor (MCC) Project deployed in ...
Connected Vehicle Pilot Deployment Program, Comprehensive Installation Plan - WYDOT CV Pilot
DOT National Transportation Integrated Search
2018-02-16
The Wyoming Department of Transportation's (WYDOT) Connected Vehicle (CV) Pilot Deployment Program is intended to develop a suite of applications that utilize vehicle-to-infrastructure (V2I) and vehicle-to-vehicle (V2V) communication technology to re...
Connected vehicle pilot deployment program phase 2 : data management plan - Tampa (THEA).
DOT National Transportation Integrated Search
2017-10-01
The Tampa Hillsborough Expressway Authority (THEA) Connected Vehicle (CV) Pilot Deployment Program is intended to develop a suite of applications that utilize vehicle-to-infrastructure (V2I) and vehicle-to-vehicle (V2V) communication technology to re...
Connected vehicle pilot deployment program phase 1, safety management plan – ICF/Wyoming.
DOT National Transportation Integrated Search
2016-03-14
The Wyoming Department of Transportations (WYDOT) Connected Vehicle (CV) Pilot Deployment Program is intended to develop a suite of applications that utilize vehicle to infrastructure (V2I) and vehicle to vehicle (V2V) communication technology to ...
Guide for mass prophylaxis of hospital employees in preparation for a bioterrorist attack.
Lee, Jeremy John; Johnson, Shannon John; Sohmer, Michael J
2009-03-15
The key elements required for the health-system pharmacist to prepare and implement a hospital-based mass prophylaxis distribution effort for hospital employees are described. A bioterrorist attack may involve multiple jurisdictions which would necessitate a regional response. Pharmacists should collaborate not only with colleagues in their immediate areas, but also with pharmacists and emergency-management planners in neighboring counties and jurisdictions. Pharmacists must also develop antibiotic drug selection protocols and define the quantity needed to maintain hospital operations after a bioterrorist attack. Once the desired antibiotics have been selected and the number of employees has been determined, along with the length of prophylaxis therapy, it should be determined how much money will be needed to purchase and store enough medications to meet the need. Next, provisions must be made to acquire and store the antibiotic cache, with attention paid to cache rotation and packaging and repackaging recommendations. A detailed procedure for the deployment of an antibiotic cache must be developed. This procedure should include job descriptions and job action sheets for deployment team members and plans for receiving and dispensing antibiotics from the Strategic National Stockpile. Once the employee prophylaxis procedure is developed, staff must be educated about it, and exercises should be conducted to identify possible weaknesses in the procedure. Health-system pharmacists should play an active role in designing and implementing an antibiotic prophylaxis plan for employees for a potential bioterrorist attack. Understanding and following procedures provided in the tool kit are critical to their successful readiness.
Contingency Analysis Post-Processing With Advanced Computing and Visualization
DOE Office of Scientific and Technical Information (OSTI.GOV)
Chen, Yousu; Glaesemann, Kurt; Fitzhenry, Erin
Contingency analysis is a critical function widely used in energy management systems to assess the impact of power system component failures. Its outputs are important for power system operation for improved situational awareness, power system planning studies, and power market operations. With the increased complexity of power system modeling and simulation caused by increased energy production and demand, the penetration of renewable energy and fast deployment of smart grid devices, and the trend of operating grids closer to their capacity for better efficiency, more and more contingencies must be executed and analyzed quickly in order to ensure grid reliability andmore » accuracy for the power market. Currently, many researchers have proposed different techniques to accelerate the computational speed of contingency analysis, but not much work has been published on how to post-process the large amount of contingency outputs quickly. This paper proposes a parallel post-processing function that can analyze contingency analysis outputs faster and display them in a web-based visualization tool to help power engineers improve their work efficiency by fast information digestion. Case studies using an ESCA-60 bus system and a WECC planning system are presented to demonstrate the functionality of the parallel post-processing technique and the web-based visualization tool.« less
National ITS Program Plan Intelligent Transportation Systems Volume I
DOT National Transportation Integrated Search
1995-03-01
ADVANCED TRAVELER INFORMATION SYSTEMS OR ATIS : THE PURPOSE OF THE NATIONAL ITS PROGRAM PLAN IS TO GUIDE THE DEVELOPMENT AND DEPLOYMENT OF INTELLIGENT TRANSPORTATION SYSTEMS (ITS) IN THE UNITED STATES. THIS, THE FIRST EDITION OF THE PLAN WAS A JOINT ...
National ITS Program Plan Executive Summary
DOT National Transportation Integrated Search
1995-03-01
THE PURPOSE OF THE NATIONAL ITS PROGRAM PLAN IS TO GUIDE THE DEVELOPMENT AND DEPLOYMENT OF INTELLIGENT TRANSPORTATION SYSTEMS (ITS) IN THE UNITED STATES. THIS FIRST EDITION OF THE PLAN WAS A JOINT EFFORT OF ITS AMERICA AND THE UNITED STATES DEPARTMEN...
DOT National Transportation Integrated Search
2001-10-01
This document is the third in a series of five that present the sequential results of the Thurston Regional Planning Council (TRPC) Regional Intelligent Transportation Systems (ITS) : Planning Project. This document presents an ITS Strategic Depl...
DOT National Transportation Integrated Search
1998-01-01
This plans purpose is to encourage coordinated, efficient and safe commercial vehicle operations throughout Montana, and to promote inter-agency and regional cooperation as ITS/CVO projects are developed and deployed. The Plan discusses Montana...
Chung, Wei-Chun; Chen, Chien-Chih; Ho, Jan-Ming; Lin, Chung-Yen; Hsu, Wen-Lian; Wang, Yu-Chun; Lee, D T; Lai, Feipei; Huang, Chih-Wei; Chang, Yu-Jung
2014-01-01
Explosive growth of next-generation sequencing data has resulted in ultra-large-scale data sets and ensuing computational problems. Cloud computing provides an on-demand and scalable environment for large-scale data analysis. Using a MapReduce framework, data and workload can be distributed via a network to computers in the cloud to substantially reduce computational latency. Hadoop/MapReduce has been successfully adopted in bioinformatics for genome assembly, mapping reads to genomes, and finding single nucleotide polymorphisms. Major cloud providers offer Hadoop cloud services to their users. However, it remains technically challenging to deploy a Hadoop cloud for those who prefer to run MapReduce programs in a cluster without built-in Hadoop/MapReduce. We present CloudDOE, a platform-independent software package implemented in Java. CloudDOE encapsulates technical details behind a user-friendly graphical interface, thus liberating scientists from having to perform complicated operational procedures. Users are guided through the user interface to deploy a Hadoop cloud within in-house computing environments and to run applications specifically targeted for bioinformatics, including CloudBurst, CloudBrush, and CloudRS. One may also use CloudDOE on top of a public cloud. CloudDOE consists of three wizards, i.e., Deploy, Operate, and Extend wizards. Deploy wizard is designed to aid the system administrator to deploy a Hadoop cloud. It installs Java runtime environment version 1.6 and Hadoop version 0.20.203, and initiates the service automatically. Operate wizard allows the user to run a MapReduce application on the dashboard list. To extend the dashboard list, the administrator may install a new MapReduce application using Extend wizard. CloudDOE is a user-friendly tool for deploying a Hadoop cloud. Its smart wizards substantially reduce the complexity and costs of deployment, execution, enhancement, and management. Interested users may collaborate to improve the source code of CloudDOE to further incorporate more MapReduce bioinformatics tools into CloudDOE and support next-generation big data open source tools, e.g., Hadoop BigTop and Spark. CloudDOE is distributed under Apache License 2.0 and is freely available at http://clouddoe.iis.sinica.edu.tw/.
Chung, Wei-Chun; Chen, Chien-Chih; Ho, Jan-Ming; Lin, Chung-Yen; Hsu, Wen-Lian; Wang, Yu-Chun; Lee, D. T.; Lai, Feipei; Huang, Chih-Wei; Chang, Yu-Jung
2014-01-01
Background Explosive growth of next-generation sequencing data has resulted in ultra-large-scale data sets and ensuing computational problems. Cloud computing provides an on-demand and scalable environment for large-scale data analysis. Using a MapReduce framework, data and workload can be distributed via a network to computers in the cloud to substantially reduce computational latency. Hadoop/MapReduce has been successfully adopted in bioinformatics for genome assembly, mapping reads to genomes, and finding single nucleotide polymorphisms. Major cloud providers offer Hadoop cloud services to their users. However, it remains technically challenging to deploy a Hadoop cloud for those who prefer to run MapReduce programs in a cluster without built-in Hadoop/MapReduce. Results We present CloudDOE, a platform-independent software package implemented in Java. CloudDOE encapsulates technical details behind a user-friendly graphical interface, thus liberating scientists from having to perform complicated operational procedures. Users are guided through the user interface to deploy a Hadoop cloud within in-house computing environments and to run applications specifically targeted for bioinformatics, including CloudBurst, CloudBrush, and CloudRS. One may also use CloudDOE on top of a public cloud. CloudDOE consists of three wizards, i.e., Deploy, Operate, and Extend wizards. Deploy wizard is designed to aid the system administrator to deploy a Hadoop cloud. It installs Java runtime environment version 1.6 and Hadoop version 0.20.203, and initiates the service automatically. Operate wizard allows the user to run a MapReduce application on the dashboard list. To extend the dashboard list, the administrator may install a new MapReduce application using Extend wizard. Conclusions CloudDOE is a user-friendly tool for deploying a Hadoop cloud. Its smart wizards substantially reduce the complexity and costs of deployment, execution, enhancement, and management. Interested users may collaborate to improve the source code of CloudDOE to further incorporate more MapReduce bioinformatics tools into CloudDOE and support next-generation big data open source tools, e.g., Hadoop BigTop and Spark. Availability: CloudDOE is distributed under Apache License 2.0 and is freely available at http://clouddoe.iis.sinica.edu.tw/. PMID:24897343
Grid Integration | Water Power | NREL
deployment planning and commercialization process. Variable and weather-dependent resources can create /generation balancing, and planning for reserves. NREL has conducted extensive in-depth wind and solar
A Roadmap to Continuous Integration for ATLAS Software Development
NASA Astrophysics Data System (ADS)
Elmsheuser, J.; Krasznahorkay, A.; Obreshkov, E.; Undrus, A.; ATLAS Collaboration
2017-10-01
The ATLAS software infrastructure facilitates efforts of more than 1000 developers working on the code base of 2200 packages with 4 million lines of C++ and 1.4 million lines of python code. The ATLAS offline code management system is the powerful, flexible framework for processing new package versions requests, probing code changes in the Nightly Build System, migration to new platforms and compilers, deployment of production releases for worldwide access and supporting physicists with tools and interfaces for efficient software use. It maintains multi-stream, parallel development environment with about 70 multi-platform branches of nightly releases and provides vast opportunities for testing new packages, for verifying patches to existing software and for migrating to new platforms and compilers. The system evolution is currently aimed on the adoption of modern continuous integration (CI) practices focused on building nightly releases early and often, with rigorous unit and integration testing. This paper describes the CI incorporation program for the ATLAS software infrastructure. It brings modern open source tools such as Jenkins and GitLab into the ATLAS Nightly System, rationalizes hardware resource allocation and administrative operations, provides improved feedback and means to fix broken builds promptly for developers. Once adopted, ATLAS CI practices will improve and accelerate innovation cycles and result in increased confidence in new software deployments. The paper reports the status of Jenkins integration with the ATLAS Nightly System as well as short and long term plans for the incorporation of CI practices.
Technical memoranda : ITS early deployment program : I-5 Seattle to Vancouver B.C.
DOT National Transportation Integrated Search
1998-01-01
The I-5 Seattle to Vancouver B.C. study is intended to provide the Washington State Department of Transportation (WSDOT) with an implementation plan for the deployment of ITS technologies along Interstate 5 from the U.S./Canadian international border...
DOT National Transportation Integrated Search
2016-06-22
The Wyoming Department of Transportations (WYDOT) Connected Vehicle (CV) Pilot Deployment Program is intended to develop a suite of applications that utilize vehicle to infrastructure (V2I) and vehicle to vehicle (V2V) communication technology to ...
ADEPT - A Mechanically Deployable Entry System Technology in Development at NASA
NASA Technical Reports Server (NTRS)
Venkatapathy, Ethiraj; Wercinski, Paul; Cassell, Alan; Smith, Brandon; Yount, Bryan
2016-01-01
The proposed presentation will give an overview of a mechanically deployable entry system concept development with a comprehensive summary of the ground tests and design development completed to-date, and current plans for a small-scale flight test in the near future.
Connected vehicle pilot deployment program phase II data privacy plan – Tampa (THEA).
DOT National Transportation Integrated Search
2017-02-01
The Tampa Hillsborough Expressway Authority (THEA) Connected Vehicle (CV) Pilot Deployment Program is intended to develop a suite of applications that utilize vehicle to infrastructure (V2I) and vehicle to vehicle (V2V) communication technology to re...
A Lightweight, Precision-Deployable, Optical Bench for High Energy Astrophysics Missions
NASA Astrophysics Data System (ADS)
Danner, Rolf; Dailey, D.; Lillie, C.
2011-09-01
The small angle of total reflection for X-rays, forcing grazing incidence optics with large collecting areas to long focal lengths, has been a fundamental barrier to the advancement of high-energy astrophysics. Design teams around the world have long recognized that a significant increase in effective area beyond Chandra and XMM-Newton requires either a deployable optical bench or separate X-ray optics and instrument module on formation flying spacecraft. Here, we show that we have in hand the components for a lightweight, precision-deployable optical bench that, through its inherent design features, is the affordable path to the next generation of imaging high-energy astrophysics missions. We present our plans for a full-scale engineering model of a deployable optical bench for Explorer-class missions. We intend to use this test article to raise the technology readiness level (TRL) of the tensegrity truss for a lightweight, precision-deployable optical bench for high-energy astrophysics missions from TRL 3 to TRL 5 through a set of four well-defined technology milestones. The milestones cover the architecture's ability to deploy and control the focal point, characterize the deployed dynamics, determine long-term stability, and verify the stowed load capability. Our plan is based on detailed design and analysis work and the construction of a first prototype by our team. Building on our prior analysis and the high TRL of the architecture components we are ready to move on to the next step. The key elements to do this affordably are two existing, fully characterized, flight-quality, deployable booms. After integrating them into the test article, we will demonstrate that our architecture meets the deployment accuracy, adjustability, and stability requirements. The same test article can be used to further raise the TRL in the future.
Lifecycle Prognostics Architecture for Selected High-Cost Active Components
DOE Office of Scientific and Technical Information (OSTI.GOV)
N. Lybeck; B. Pham; M. Tawfik
There are an extensive body of knowledge and some commercial products available for calculating prognostics, remaining useful life, and damage index parameters. The application of these technologies within the nuclear power community is still in its infancy. Online monitoring and condition-based maintenance is seeing increasing acceptance and deployment, and these activities provide the technological bases for expanding to add predictive/prognostics capabilities. In looking to deploy prognostics there are three key aspects of systems that are presented and discussed: (1) component/system/structure selection, (2) prognostic algorithms, and (3) prognostics architectures. Criteria are presented for component selection: feasibility, failure probability, consequences of failure,more » and benefits of the prognostics and health management (PHM) system. The basis and methods commonly used for prognostics algorithms are reviewed and summarized. Criteria for evaluating PHM architectures are presented: open, modular architecture; platform independence; graphical user interface for system development and/or results viewing; web enabled tools; scalability; and standards compatibility. Thirteen software products were identified and discussed in the context of being potentially useful for deployment in a PHM program applied to systems in a nuclear power plant (NPP). These products were evaluated by using information available from company websites, product brochures, fact sheets, scholarly publications, and direct communication with vendors. The thirteen products were classified into four groups of software: (1) research tools, (2) PHM system development tools, (3) deployable architectures, and (4) peripheral tools. Eight software tools fell into the deployable architectures category. Of those eight, only two employ all six modules of a full PHM system. Five systems did not offer prognostic estimates, and one system employed the full health monitoring suite but lacked operations and maintenance support. Each product is briefly described in Appendix A. Selection of the most appropriate software package for a particular application will depend on the chosen component, system, or structure. Ongoing research will determine the most appropriate choices for a successful demonstration of PHM systems in aging NPPs.« less
Mobile phone tools for field-based health care workers in low-income countries.
Derenzi, Brian; Borriello, Gaetano; Jackson, Jonathan; Kumar, Vikram S; Parikh, Tapan S; Virk, Pushwaz; Lesh, Neal
2011-01-01
In low-income regions, mobile phone-based tools can improve the scope and efficiency of field health workers. They can also address challenges in monitoring and supervising a large number of geographically distributed health workers. Several tools have been built and deployed in the field, but little comparison has been done to help understand their effectiveness. This is largely because no framework exists in which to analyze the different ways in which the tools help strengthen existing health systems. In this article we highlight 6 key functions that health systems currently perform where mobile tools can provide the most benefit. Using these 6 health system functions, we compare existing applications for community health workers, an important class of field health workers who use these technologies, and discuss common challenges and lessons learned about deploying mobile tools. © 2011 Mount Sinai School of Medicine.
DOT National Transportation Integrated Search
2016-08-01
The Participant Training and Stakeholder Education Plan is a high-level plan for the recruitment and training of all automobile drivers, pedestrians, transit drivers, traffic management center (TMC) operators, and installation and maintenance technic...
49 CFR 268.19 - Evaluation of applications for preconstruction planning assistance.
Code of Federal Regulations, 2010 CFR
2010-10-01
... planning assistance. 268.19 Section 268.19 Transportation Other Regulations Relating to Transportation... TECHNOLOGY DEPLOYMENT PROGRAM Procedures For Financial Assistance § 268.19 Evaluation of applications for preconstruction planning assistance. The FRA will evaluate the applications for their completeness and...
49 CFR 268.13 - Deadline for submission of applications for preconstruction planning assistance.
Code of Federal Regulations, 2010 CFR
2010-10-01
... preconstruction planning assistance. 268.13 Section 268.13 Transportation Other Regulations Relating to... TRANSPORTATION TECHNOLOGY DEPLOYMENT PROGRAM Procedures For Financial Assistance § 268.13 Deadline for submission of applications for preconstruction planning assistance. Completed application packages shall be...
National ITS Program Plan, Intelligent Transportation Systems, Synopsis
DOT National Transportation Integrated Search
THE PURPOSE OF THE NATIONAL ITS PROGRAM PLAN IS TO GUIDE THE DEVELOPMENT AND DEPLOYMENT OF INTELLIGENT TRANSPORTATION SYSTEMS (ITS) IN THE UNITED STATES. THIS, THE FIRST EDITION OF THE PLAN WAS A JOINT EFFORT OF ITS AMERICA AND THE UNITED STATES DEPA...
Higashiura, Wataru; Sakaguchi, Shoji; Tabayashi, Nobuoki; Taniguchi, Shigeki; Kichikawa, Kimihiko
2008-12-01
Compared with open surgery, imaging is considered to be important for planning and device selection of endovascular aneurysm repair (EVAR). The present study evaluated the usefulness of a 3-dimensional (3D)-computed tomography (CT) workstation in planning EVAR. A prospective study was conducted in 8 patients who underwent EVAR using Zenith endograft between February and August 2007. Endograft size and optimized deployment projection were decided using a 3D-CT workstation. The primary endpoint was defined as successful deployment of a same size endograft as preoperatively selected without type I or III endoleak or inadvertent arterial occlusion. The following parameters were investigated: (a) incidence of use of an alternative endograft; (b) prevalence of type I or III endoleak; and (c) distance from lowest renal artery to tip of graft. Successful deployment of endograft was achieved in all 8 patients. Use of alternative endograft or type I or III endoleak was not detected in 8 patients. Distance from the lowest renal artery to the tip of the graft was 2.8mm. Assessment using a 3D-CT workstation appears to allow accurate endograft selection and precise deployment of the Zenith endograft without type I or III endoleak, even in institutes with a small number of patients.
Analyzing mobile WiMAX base station deployment under different frequency planning strategies
NASA Astrophysics Data System (ADS)
Salman, M. K.; Ahmad, R. B.; Ali, Ziad G.; Aldhaibani, Jaafar A.; Fayadh, Rashid A.
2015-05-01
The frequency spectrum is a precious resource and scarce in the communication markets. Therefore, different techniques are adopted to utilize the available spectrum in deploying WiMAX base stations (BS) in cellular networks. In this paper several types of frequency planning techniques are illustrated, and a comprehensive comparative study between conventional frequency reuse of 1 (FR of 1) and fractional frequency reuse (FFR) is presented. These techniques are widely used in network deployment, because they employ universal frequency (using all the available bandwidth) in their base station installation/configuration within network system. This paper presents a network model of 19 base stations in order to be employed in the comparison of the aforesaid frequency planning techniques. Users are randomly distributed within base stations, users' resource mapping and their burst profile selection are based on the measured signal to interference plus-noise ratio (SINR). Simulation results reveal that the FFR has advantages over the conventional FR of 1 in various metrics. 98 % of downlink resources (slots) are exploited when FFR is applied, whilst it is 81 % at FR of 1. Data rate of FFR has been increased to 10.6 Mbps, while it is 7.98 Mbps at FR of 1. The spectral efficiency is better enhanced (1.072 bps/Hz) at FR of 1 than FFR (0.808 bps/Hz), since FR of 1 exploits all the Bandwidth. The subcarrier efficiency shows how many data bits that can be carried by subcarriers under different frequency planning techniques, the system can carry more data bits under FFR (2.40 bit/subcarrier) than FR of 1 (1.998 bit/subcarrier). This study confirms that FFR can perform better than conventional frequency planning (FR of 1) which made it a strong candidate for WiMAX BS deployment in cellular networks.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Denholm, P.; Hummon, M.
2013-02-01
Concentrating solar power (CSP) deployed with thermal energy storage (TES) provides a dispatchable source of renewable energy. The value of CSP with TES, as with other potential generation resources, needs to be established using traditional utility planning tools. Production cost models, which simulate the operation of grid, are often used to estimate the operational value of different generation mixes. CSP with TES has historically had limited analysis in commercial production simulations. This document describes the implementation of CSP with TES in a commercial production cost model. It also describes the simulation of grid operations with CSP in a test systemmore » consisting of two balancing areas located primarily in Colorado.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Denholm, P.; Hummon, M.
2012-11-01
Concentrating solar power (CSP) deployed with thermal energy storage (TES) provides a dispatchable source of renewable energy. The value of CSP with TES, as with other potential generation resources, needs to be established using traditional utility planning tools. Production cost models, which simulate the operation of grid, are often used to estimate the operational value of different generation mixes. CSP with TES has historically had limited analysis in commercial production simulations. This document describes the implementation of CSP with TES in a commercial production cost model. It also describes the simulation of grid operations with CSP in a test systemmore » consisting of two balancing areas located primarily in Colorado.« less
Annual Report: Carbon Capture Simulation Initiative (CCSI) (30 September 2012)
DOE Office of Scientific and Technical Information (OSTI.GOV)
Miller, David C.; Syamlal, Madhava; Cottrell, Roger
2012-09-30
The Carbon Capture Simulation Initiative (CCSI) is a partnership among national laboratories, industry and academic institutions that is developing and deploying state-of-the-art computational modeling and simulation tools to accelerate the commercialization of carbon capture technologies from discovery to development, demonstration, and ultimately the widespread deployment to hundreds of power plants. The CCSI Toolset will provide end users in industry with a comprehensive, integrated suite of scientifically validated models, with uncertainty quantification (UQ), optimization, risk analysis and decision making capabilities. The CCSI Toolset incorporates commercial and open-source software currently in use by industry and is also developing new software tools asmore » necessary to fill technology gaps identified during execution of the project. Ultimately, the CCSI Toolset will (1) enable promising concepts to be more quickly identified through rapid computational screening of devices and processes; (2) reduce the time to design and troubleshoot new devices and processes; (3) quantify the technical risk in taking technology from laboratory-scale to commercial-scale; and (4) stabilize deployment costs more quickly by replacing some of the physical operational tests with virtual power plant simulations. CCSI is organized into 8 technical elements that fall under two focus areas. The first focus area (Physicochemical Models and Data) addresses the steps necessary to model and simulate the various technologies and processes needed to bring a new Carbon Capture and Storage (CCS) technology into production. The second focus area (Analysis & Software) is developing the software infrastructure to integrate the various components and implement the tools that are needed to make quantifiable decisions regarding the viability of new CCS technologies. CCSI also has an Industry Advisory Board (IAB). By working closely with industry from the inception of the project to identify industrial challenge problems, CCSI ensures that the simulation tools are developed for the carbon capture technologies of most relevance to industry. CCSI is led by the National Energy Technology Laboratory (NETL) and leverages the Department of Energy (DOE) national laboratories' core strengths in modeling and simulation, bringing together the best capabilities at NETL, Los Alamos National Laboratory (LANL), Lawrence Berkeley National Laboratory (LBNL), Lawrence Livermore National Laboratory (LLNL), and Pacific Northwest National Laboratory (PNNL). The CCSI's industrial partners provide representation from the power generation industry, equipment manufacturers, technology providers and engineering and construction firms. The CCSI's academic participants (Carnegie Mellon University, Princeton University, West Virginia University, and Boston University) bring unparalleled expertise in multiphase flow reactors, combustion, process synthesis and optimization, planning and scheduling, and process control techniques for energy processes. During Fiscal Year (FY) 12, CCSI released its first set of computational tools and models. This pre-release, a year ahead of the originally planned first release, is the result of intense industry interest in getting early access to the tools and the phenomenal progress of the CCSI technical team. These initial components of the CCSI Toolset provide new models and computational capabilities that will accelerate the commercial development of carbon capture technologies as well as related technologies, such as those found in the power, refining, chemicals, and gas production industries. The release consists of new tools for process synthesis and optimization to help identify promising concepts more quickly, new physics-based models of potential capture equipment and processes that will reduce the time to design and troubleshoot new systems, a framework to quantify the uncertainty of model predictions, and various enabling tools that provide new capabilities such as creating reduced order models (ROMs) from reacting multiphase flow simulations and running thousands of process simulations concurrently for optimization and UQ.« less
Using Power Purchase Agreements for Solar Deployment at Universities
DOE Office of Scientific and Technical Information (OSTI.GOV)
Heeter, Jenny; O'Shaughnessy, Eric
More than 60 universities have used solar power purchase agreements (PPAs) to deploy more than 100 megawatts of solar PV on campuses around the country. This webinar is intended for university financial planners and other stakeholders who are assessing the financial aspects of deploying solar. The speakers will provide an overview of how universities are using PPAs and key PPA components. In addition, they will discuss the process of using PPAs, why PPAs make sense for campus solar deployment, and the benefits and challenges for universities. Tools and other resources will be shared to help universities interested in using PPAsmore » for campus solar deployment.« less
NASA Astrophysics Data System (ADS)
Lichtenstein, Yossi; Cucuy, Shy; Fink, Lior
2017-03-01
The effective deployment of enterprise systems has been a major challenge for many organisations. Customising the new system, changing business processes, and integrating multiple information sources are all difficult tasks. As such, they are typically done in carefully planned stages in a process known as phased implementation. Using ideas from Option Theory, this article critiques aspects of phased implementation. One customer relationship management (CRM) project and its phased implementation are described in detail and ten other enterprise system deployments are summarised as a basis for the observation that almost all deployment stages are pre-defined operational steps rather than decision points. However, Option Theory suggests that optional stages, to be used only when risk materialises, should be integral parts of project plans. Although such optional stages are often more valuable than pre-defined stages, the evidence presented in this article shows that they are only rarely utilised. Therefore, a simple framework is presented; it first identifies risks related to the deployment of enterprise systems, then identifies optional stages that can mitigate these risks, and finally compares the costs and benefits of both pre-defined and optional stages.
DOT National Transportation Integrated Search
2016-06-06
The Wyoming Department of Transportations (WYDOT) Connected Vehicle (CV) Pilot Deployment Program is intended to develop a suite of applications that utilize vehicle to infrastructure (V2I) and vehicle to vehicle (V2V) communication technology to ...
An epidemiological approach to mass casualty incidents in the Principality of Asturias (Spain).
Castro Delgado, Rafael; Naves Gómez, Cecilia; Cuartas Álvarez, Tatiana; Arcos González, Pedro
2016-02-24
Mass Casualty Incidents (MCI) have been rarely studied from epidemiological approaches. The objective of this study is to establish the epidemiological profile of MCI in the autonomous region of the Principality of Asturias (Spain) and analyse ambulance deployment and severity of patients. This is a population-based prospective study run in 2014. Inclusion criteria for MCI is "every incident with four or more people affected that requires ambulance mobilisation". Thirty-nine MCI have been identified in Asturias in 2014. Thirty-one (79%) were road traffic accidents, three (7.5%) fires and five (12.8%) other types. Twenty-one incidents (56.7%) had four patients, and only three of them (8%) had seven or more patients. An average of 2.41 ambulances per incident were deployed (standard error = 0.18). Most of the patients per incident were minor injured patients (mean = 4; standard error = 0.2), and 0,26 were severe patients (standard error = 0.08). There was a positive significant correlation (p < 0.01) between the total number of patients and the total number of ambulances deployed and between the total number of patients and Advanced Life Support (ALS) ambulances deployed (p < 0.001). The total number of non-ALS ambulances was not related with the total number of patients. Population based research in MCI is essential to define MCI profile. Quantitative definition of MCI, adapted to resources, avoid selection bias and present a more accurate profile of MCI. As espected, road traffic accidents are the most frequent MCI in our region. This aspect is essential to plan training and response to MCI. Analysis of total response to MCI shows that for almost an hour, we should plan extra resources for daily emergencies. This data is an important issue to bear in mind when planning MCI response. The fact that most patients are classified as minor injured and more advanced life support units than needed are deployed shows that analysis of resources deployment and patient severity helps us to better plan future MCI response. Road traffic accidents with minor injured patients are the most frequent MCI in our region. More advanced life support units than needed have been initially deployed, which might compromise response to daily emergencies during an MCI.
An approach to evaluating reactive airborne wind shear systems
NASA Technical Reports Server (NTRS)
Gibson, Joseph P., Jr.
1992-01-01
An approach to evaluating reactive airborne windshear detection systems was developed to support a deployment study for future FAA ground-based windshear detection systems. The deployment study methodology assesses potential future safety enhancements beyond planned capabilities. The reactive airborne systems will be an integral part of planned windshear safety enhancements. The approach to evaluating reactive airborne systems involves separate analyses for both landing and take-off scenario. The analysis estimates the probability of effective warning considering several factors including NASA energy height loss characteristics, reactive alert timing, and a probability distribution for microburst strength.
Vehicle Technology Simulation and Analysis Tools | Transportation Research
| NREL Vehicle Technology Simulation and Analysis Tools Vehicle Technology Simulation and vehicle technologies with the potential to achieve significant fuel savings and emission reductions. NREL : Automotive Deployment Options Projection Tool The ADOPT modeling tool estimates vehicle technology
Risk Reduction and Training using Simulation Based Tools - 12180
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hall, Irin P.
2012-07-01
Process Modeling and Simulation (M and S) has been used for many years in manufacturing and similar domains, as part of an industrial engineer's tool box. Traditionally, however, this technique has been employed in small, isolated projects where models were created from scratch, often making it time and cost prohibitive. Newport News Shipbuilding (NNS) has recognized the value of this predictive technique and what it offers in terms of risk reduction, cost avoidance and on-schedule performance of highly complex work. To facilitate implementation, NNS has been maturing a process and the software to rapidly deploy and reuse M and Smore » based decision support tools in a variety of environments. Some examples of successful applications by NNS of this technique in the nuclear domain are a reactor refueling simulation based tool, a fuel handling facility simulation based tool and a tool for dynamic radiation exposure tracking. The next generation of M and S applications include expanding simulation based tools into immersive and interactive training. The applications discussed here take a tool box approach to creating simulation based decision support tools for maximum utility and return on investment. This approach involves creating a collection of simulation tools that can be used individually or integrated together for a larger application. The refueling simulation integrates with the fuel handling facility simulation to understand every aspect and dependency of the fuel handling evolutions. This approach translates nicely to other complex domains where real system experimentation is not feasible, such as nuclear fuel lifecycle and waste management. Similar concepts can also be applied to different types of simulation techniques. For example, a process simulation of liquid waste operations may be useful to streamline and plan operations, while a chemical model of the liquid waste composition is an important tool for making decisions with respect to waste disposition. Integrating these tools into a larger virtual system provides a tool for making larger strategic decisions. The key to integrating and creating these virtual environments is the software and the process used to build them. Although important steps in the direction of using simulation based tools for nuclear domain, the applications described here represent only a small cross section of possible benefits. The next generation of applications will, likely, focus on situational awareness and adaptive planning. Situational awareness refers to the ability to visualize in real time the state of operations. Some useful tools in this area are Geographic Information Systems (GIS), which help monitor and analyze geographically referenced information. Combined with such situational awareness capability, simulation tools can serve as the platform for adaptive planning tools. These are the tools that allow the decision maker to react to the changing environment in real time by synthesizing massive amounts of data into easily understood information. For the nuclear domains, this may mean creation of Virtual Nuclear Systems, from Virtual Waste Processing Plants to Virtual Nuclear Reactors. (authors)« less
National ITS Program Plan, Intelligent Transportation Systems Volume II
DOT National Transportation Integrated Search
1995-03-01
THE PURPOSE OF THE NATIONAL ITS PROGRAM PLAN IS TO GUIDE THE DEVELOPMENT AND DEPLOYMENT OF INTELLIGENT TRANSPORTATION SYSTEMS (ITS) IN THE UNITED STATES. THIS, THE FIRST EDITION OF THE PLAN WAS A JOINT EFFORT OF ITS AMERICA AND THE UNITED STATES DEPA...
Intelligent Transportation Systems Early Deployment Planning for a Small Region
DOT National Transportation Integrated Search
1999-01-01
Strategic planning for intelligent transportation systems (ITS) in : smaller metropolitan areas presents a number of difficulties. Awareness of and : experience with the use of electronics and communications systems among : transportation syst...
Integrated Strategic Planning and Analysis Network Increment 4 (ISPAN Inc 4)
2016-03-01
Defense Acquisition Executive DoD - Department of Defense DoDAF - DoD Architecture Framework FD - Full Deployment FDD - Full Deployment Decision FY...Inc 4 will achieve FDD completion criteria when: 1) the system meets all the KPP thresholds as verified through an Initial Operational Test and
Integrated Strategic Planning and Analysis Network Increment 5 (ISPAN Inc 5)
2016-03-01
Defense Acquisition Executive DoD - Department of Defense DoDAF - DoD Architecture Framework FD - Full Deployment FDD - Full Deployment Decision...achieve FDD in August 2018. ISPAN Inc 5 is envisioned as a follow-on to ISPAN Inc 4 in order to respond to USSTRATCOM requirements for improved
SATWG networked quality function deployment
NASA Technical Reports Server (NTRS)
Brown, Don
1992-01-01
The initiative of this work is to develop a cooperative process for continual evolution of an integrated, time phased avionics technology plan that involves customers, technologists, developers, and managers. This will be accomplished by demonstrating a computer network technology to augment the Quality Function Deployment (QFD). All results are presented in viewgraph format.
Web Application Software for Ground Operations Planning Database (GOPDb) Management
NASA Technical Reports Server (NTRS)
Lanham, Clifton; Kallner, Shawn; Gernand, Jeffrey
2013-01-01
A Web application facilitates collaborative development of the ground operations planning document. This will reduce costs and development time for new programs by incorporating the data governance, access control, and revision tracking of the ground operations planning data. Ground Operations Planning requires the creation and maintenance of detailed timelines and documentation. The GOPDb Web application was created using state-of-the-art Web 2.0 technologies, and was deployed as SaaS (Software as a Service), with an emphasis on data governance and security needs. Application access is managed using two-factor authentication, with data write permissions tied to user roles and responsibilities. Multiple instances of the application can be deployed on a Web server to meet the robust needs for multiple, future programs with minimal additional cost. This innovation features high availability and scalability, with no additional software that needs to be bought or installed. For data governance and security (data quality, management, business process management, and risk management for data handling), the software uses NAMS. No local copy/cloning of data is permitted. Data change log/tracking is addressed, as well as collaboration, work flow, and process standardization. The software provides on-line documentation and detailed Web-based help. There are multiple ways that this software can be deployed on a Web server to meet ground operations planning needs for future programs. The software could be used to support commercial crew ground operations planning, as well as commercial payload/satellite ground operations planning. The application source code and database schema are owned by NASA.
Mission Planning System Increment 5 (MPS Inc 5)
2016-03-01
DoD - Department of Defense DoDAF - DoD Architecture Framework FD - Full Deployment FDD - Full Deployment Decision FY - Fiscal Year IA...Alternative Selected (Funds First Obligated (FFO)) (O/T) : Mar 2013 / Mar 2013 • MS B (O/T) : Apr 2012 / Apr 2012 • MS C (O/T) : N/A / N/A • FDD (O/T...Deployed Software Intensive Program" as described in the DOD Instruction 5000.02, January 7, 2015. 4. FDD provides approval to field the
DOT National Transportation Integrated Search
2016-07-01
This document provides guidance material in regards to the Concept of Operations for the CV Pilots DeploymentConcept Development Phase. Methods for system engineering are discussed in depth with definitions for thesuccessful management of each aspect...
DOT National Transportation Integrated Search
2016-07-01
This document provides guidance material in regards to System Requirements for the CV Pilots Deployment Concept Development Phase. Methods for system engineering are discussed with definitions for the successful management of each aspect. Important r...
Integrated planning and scheduling for Earth science data processing
NASA Technical Reports Server (NTRS)
Boddy, Mark; White, Jim; Goldman, Robert; Short, Nick, Jr.
1995-01-01
Several current NASA programs such as the EOSDIS Core System (ECS) have data processing and data management requirements that call for an integrated planning and scheduling capability. In this paper, we describe the experience of applying advanced scheduling technology operationally, in terms of what was accomplished, lessons learned, and what remains to be done in order to achieve similar successes in ECS and other programs. We discuss the importance and benefits of advanced scheduling tools, and our progress toward realizing them, through examples and illustrations based on ECS requirements. The first part of the paper focuses on the Data Archive and Distribution (DADS) V0 Scheduler. We then discuss system integration issues ranging from communication with the scheduler to the monitoring of system events and re-scheduling in response to them. The challenge of adapting the scheduler to domain-specific features and scheduling policies is also considered. Extrapolation to the ECS domain raises issues of integrating scheduling with a product-generation planner (such as PlaSTiC), and implementing conditional planning in an operational system. We conclude by briefly noting ongoing technology development and deployment projects being undertaken by HTC and the ISTB.
NASA Astrophysics Data System (ADS)
Comendant, T.; Strittholt, J. R.; Ward, B. C.; Bachelet, D. M.; Grossman, D.; Stevenson-Molnar, N.; Henifin, K.; Lundin, M.; Marvin, T. S.; Peterman, W. L.; Corrigan, G. N.; O'Connor, K.
2013-12-01
A multi-disciplinary team of scientists, software engineers, and outreach staff at the Conservation Biology Institute launched an open-access, web-based spatial data platform called Data Basin (www.databasin.org) in 2010. Primarily built to support research and environmental resource planning, Data Basin provides the capability for individuals and organizations to explore, create, interpret, and collaborate around their priority topics and geographies. We used a stakeholder analysis to assess the needs of data consumers/produces and help prioritize primary and secondary audiences. Data Basin's simple and user-friendly interface makes mapping and geo-processing tools more accessible to less technical audiences. Input from users is considered in system planning, testing, and implementation. The team continually develops using an agile software development approach, which allows new features, improvements, and bug fixes to be deployed to the live system on a frequent basis. The data import process is handled through administrative approval and Data Basin requires spatial data (biological, physical, and socio-economic) to be well-documented. Outreach and training is used to convey the scope and appropriate use of the scientific information and available resources.
A New Network Modeling Tool for the Ground-based Nuclear Explosion Monitoring Community
NASA Astrophysics Data System (ADS)
Merchant, B. J.; Chael, E. P.; Young, C. J.
2013-12-01
Network simulations have long been used to assess the performance of monitoring networks to detect events for such purposes as planning station deployments and network resilience to outages. The standard tool has been the SAIC-developed NetSim package. With correct parameters, NetSim can produce useful simulations; however, the package has several shortcomings: an older language (FORTRAN), an emphasis on seismic monitoring with limited support for other technologies, limited documentation, and a limited parameter set. Thus, we are developing NetMOD (Network Monitoring for Optimal Detection), a Java-based tool designed to assess the performance of ground-based networks. NetMOD's advantages include: coded in a modern language that is multi-platform, utilizes modern computing performance (e.g. multi-core processors), incorporates monitoring technologies other than seismic, and includes a well-validated default parameter set for the IMS stations. NetMOD is designed to be extendable through a plugin infrastructure, so new phenomenological models can be added. Development of the Seismic Detection Plugin is being pursued first. Seismic location and infrasound and hydroacoustic detection plugins will follow. By making NetMOD an open-release package, it can hopefully provide a common tool that the monitoring community can use to produce assessments of monitoring networks and to verify assessments made by others.
Individualized Behavioral Health Monitoring Tool
NASA Technical Reports Server (NTRS)
Mollicone, Daniel
2015-01-01
Behavioral health risks during long-duration space exploration missions are among the most difficult to predict, detect, and mitigate. Given the anticipated extended duration of future missions and their isolated, extreme, and confined environments, there is the possibility that behavior conditions and mental disorders will develop among astronaut crew. Pulsar Informatics, Inc., has developed a health monitoring tool that provides a means to detect and address behavioral disorders and mental conditions at an early stage. The tool integrates all available behavioral measures collected during a mission to identify possible health indicator warning signs within the context of quantitatively tracked mission stressors. It is unobtrusive and requires minimal crew time and effort to train and utilize. The monitoring tool can be deployed in space analog environments for validation testing and ultimate deployment in long-duration space exploration missions.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Dennis, B.R.; Lawton, R.G.; Kolar, J.D.
The well-logging operations performed in the Miravalles Geothermal Field in Costa Rica were conducted during two separate field trips. The Phase I program provided the deployment of a suite of high-temperature borehole instruments, including the temperature/rabbit, fluid sampler, and three-arm caliper in Well PGM-3. These same tools were deployed in Well PGM-10 along with an additional survey run with a combination fluid velocity/temperature/pressure instrument used to measure thermodynamic properties under flowing well conditions. The Phase II program complemented Phase I with the suite of tools deployed in Wells PGM-5, PGM-11, and PGM-12. 4 refs., 25 figs., 1 tab.
NASA Astrophysics Data System (ADS)
Labak, P.; Ford, S. R.; Sweeney, J. J.; Smith, A. T.; Spivak, A.
2011-12-01
One of four elements of CTBT verification regime is On-site inspection (OSI). Since the sole purpose of an OSI shall be to clarify whether a nuclear weapon test explosion or any other nuclear explosion has been carried out, inspection activities can be conducted and techniques used in order to collect facts to support findings provided in inspection reports. Passive seismological monitoring, realized by the seismic aftershock monitoring (SAMS) is one of the treaty allowed techniques during an OSI. Effective planning and deployment of SAMS during the early stages of an OSI is required due to the nature of possible events recorded and due to the treaty related constrains on size of inspection area, size of inspection team and length of an inspection. A method, which may help in planning the SAMS deployment is presented. An estimate of aftershock activity due to a theoretical underground nuclear explosion is produced using a simple aftershock rate model (Ford and Walter, 2010). The model is developed with data from the Nevada Test Site and Semipalatinsk Test Site, which we take to represent soft- and hard-rock testing environments, respectively. Estimates of expected magnitude and number of aftershocks are calculated using the models for different testing and inspection scenarios. These estimates can help to plan the SAMS deployment for an OSI by giving a probabilistic assessment of potential aftershocks in the Inspection Area (IA). The aftershock assessment combined with an estimate of the background seismicity in the IA and an empirically-derived map of threshold magnitude for the SAMS network could aid the OSI team in reporting. We tested the hard-rock model to a scenario similar to the 2008 Integrated Field Exercise 2008 deployment in Kazakhstan and produce an estimate of possible recorded aftershock activity.
Missouri commercial vehicle operations : state business plan
DOT National Transportation Integrated Search
1998-05-15
This business plan is intended to assist this state in improving its commercial vehicle operation regulation, guide the deployment and installation of intelligent transportation systems and to implement these systems in an efficient and cost effectiv...
Riddle, M S; Althoff, J M; Earhart, K; Monteville, M R; Yingst, S L; Mohareb, E W; Putnam, S D; Sanders, J W
2008-05-01
Understanding the epidemiology of current health threats to deployed U.S. troops is important for medical assessment and planning. As part of a 2004 study among U.S. military personnel deployed to Al Asad Air Base, in the western Anbar Province of Iraq, over 500 subjects were enrolled, provided a blood specimen, and completed a questionnaire regarding history of febrile illness during this deployment (average approximately 4 months in country). This mid-deployment serum was compared to pre-deployment samples (collected approximately 3 months prior to deployment) and evaluated for seroconversion to a select panel of regional arboviral pathogens. At least one episode of febrile illness was reported in 84/504 (17%) of the troops surveyed. Seroconversion was documented in nine (2%) of deployed forces tested, with no association to febrile illness. Self-reported febrile illness was uncommon although often debilitating, and the risk of illness due to arbovirus infections was relatively low.
Grid Integration Studies: Advancing Clean Energy Planning and Deployment
DOE Office of Scientific and Technical Information (OSTI.GOV)
Katz, Jessica; Chernyakhovskiy, Ilya
2016-07-01
Integrating significant variable renewable energy (VRE) into the grid requires an evolution in power system planning and operation. To plan for this evolution, power system stakeholders can undertake grid integration studies. This Greening the Grid document reviews grid integration studies, common elements, questions, and guidance for system planners.
Tying Resource Allocation and TQM into Planning and Assessment Efforts.
ERIC Educational Resources Information Center
Mullendore, Richard H.; Wang, Li-Shing
1996-01-01
Describes the evolution of a model, developed by student affairs officials, which outlines a planning process for implementing Total Quality Management. Presents step-by-step instructions for the model's deployment and discusses such issues as transitions, planning forms, goals, and professional and personal growth needs. (RJM)
From Symphony to Jazz: The Concept of Strategy in Education.
ERIC Educational Resources Information Center
Bell, Les
1998-01-01
Considers derivation of the strategy concept and its deployment as a managerial planning technique. Examines the related growth of school development planning, exploring ways it might be considered strategic. Using strategy in organizations is no longer either possible or appropriate. Proposes an alternative planning basis derived from marginal…
Group specializes in the research, development and deployment of software that support the design and controls design, the Spawn of EnergyPlus next-generation simulation engine, for building and control energy systems tools for OpenBuildingControl to support control design, deployment and verification of building
Visualization of Atmospheric Water Vapor Data for SAGE
NASA Technical Reports Server (NTRS)
Kung, Mou-Liang; Chu, W. P. (Technical Monitor)
2000-01-01
The goal of this project was to develop visualization tools to study the water vapor dynamics using the Stratospheric Aerosol and Gas Experiment 11 (SAGE 11) water vapor data. During the past years, we completed the development of a visualization tool called EZSAGE, and various Gridded Water Vapor plots, tools deployed on the web to provide users with new insight into the water vapor dynamics. Results and experiences from this project, including papers, tutorials and reviews were published on the main Web page. Additional publishing effort has been initiated to package EZSAGE software for CD production and distribution. There have been some major personnel changes since Fall, 1998. Dr. Mou-Liang Kung, a Professor of Computer Science assumed the PI position vacated by Dr. Waldo Rodriguez who was on leave. However, former PI, Dr. Rodriguez continued to serve as a research adviser to this project to assure smooth transition and project completion. Typically in each semester, five student research assistants were hired and trained. Weekly group meetings were held to discuss problems, progress, new research direction, and activity planning. Other small group meetings were also held regularly for different objectives of this project. All student research assistants were required to submit reports for conference submission.
DOT National Transportation Integrated Search
2001-11-01
This document identifies successful rural Intelligent Transportation Systems (ITS) projects and statewide applications. These applications are referred to as "tools" and include those in the process of being tested prior to full deployment. The tools...
1981-06-23
Some negative impacts of MX deployment on mining in the study area are unavoidable, but careful planning in water use and actual shelter site...depend upon the extent of deployment and location of shelter sites. A major impact on the mining industry will result if draw-down of the water table...use and acquire the necessary land rights or whether the affected shelter (s) should be abandoned or replaced elsewhere in the deployment area. Egec E-TR
Fitch, Jay
2002-02-01
When it comes to deployment, one size (approach) doesn't fit all. Progressive public safety and EMS systems will recognize that a successful plan can thoughtfully balance system performance and human needs. Inventive people who learned how to do things better, cheaper and faster built America. Providing optimum system coverage, improved response times and quality care for patients fits the same mold. Sophisticated and accountable EMS systems readily accept this as part of their mandate.
DOT National Transportation Integrated Search
2004-11-01
In 1999, the Treasure Valley area of the State of Idaho received a federal earmark of $441,470 to develop an Incident Management Plan for the Treasure Valley and to design/deploy Intelligent Transportation Systems (ITS) devices for Interstates 84 and...
Developing and Deploying OERs in Sub-Saharan Africa: Building on the Present
ERIC Educational Resources Information Center
Wright, Clayton R.; Reju, Sunday A.
2012-01-01
Open educational resources (OERs) have the potential to reduce costs, improve quality, and increase access to educational opportunities. OER development and deployment is one path that could contribute to achieving education for all. This article builds on existing information and communication technology (ICT) implementation plans in Africa and…
Marshall Space Flight Center Propulsion Systems Department (PSD) KM Initiative
NASA Technical Reports Server (NTRS)
Caraccioli, Paul; Varnadoe, Tom; McCarter, Mike
2006-01-01
NASA Marshall Space Flight Center s Propulsion Systems Department (PSD) is four months into a fifteen month Knowledge Management (KM) initiative to support enhanced engineering decision making and analyses, faster resolution of anomalies (near-term) and effective, efficient knowledge infused engineering processes, reduced knowledge attrition, and reduced anomaly occurrences (long-term). The near-term objective of this initiative is developing a KM Pilot project, within the context of a 3-5 year KM strategy, to introduce and evaluate the use of KM within PSD. An internal NASA/MSFC PSD KM team was established early in project formulation to maintain a practitioner, user-centric focus throughout the conceptual development, planning and deployment of KM technologies and capabilities with in the PSD. The PSD internal team is supported by the University of Alabama's Aging Infrastructure Systems Center Of Excellence (AISCE), Intergraph Corporation, and The Knowledge Institute. The principle product of the initial four month effort has been strategic planning of PSD KM implementation by first determining the "as is" state of KM capabilities and developing, planning and documenting the roadmap to achieve the desired "to be" state. Activities undertaken to support the planning phase have included data gathering; cultural surveys, group work-sessions, interviews, documentation review, and independent research. Assessments and analyses have been performed including industry benchmarking, related local and Agency initiatives, specific tools and techniques used and strategies for leveraging existing resources, people and technology to achieve common KM goals. Key findings captured in the PSD KM Strategic Plan include the system vision, purpose, stakeholders, prioritized strategic objectives mapped to the top ten practitioner needs and analysis of current resource usage. Opportunities identified from research, analyses, cultural/KM surveys and practitioner interviews include: executive and senior management sponsorship, KM awareness, promotion and training, cultural change management, process improvement, leveraging existing resources and new innovative technologies to align with other NASA KM initiatives (convergence: the big picture). To enable results based incremental implementation and future growth of the KM initiative, key performance measures have been identified including stakeholder value, system utility, learning and growth (knowledge capture, sharing, reduced anomaly recurrence), cultural change, process improvement and return-on-investment. The next steps for the initial implementation spiral (focused on SSME Turbomachinery) have been identified, largely based on the organization and compilation of summary level engineering process models, data capture matrices, functional models and conceptual-level systems architecture. Key elements include detailed KM requirements definition, KM technology architecture assessment, evaluation and selection, deployable KM Pilot design, development, implementation and evaluation, and justifying full implementation (estimated Return-on-Investment). Features identified for the notional system architecture include the knowledge presentation layer (and its components), knowledge network layer (and its components), knowledge storage layer (and its components), User Interface and capabilities. This paper provides a snapshot of the progress to date, the near term planning for deploying the KM pilot project and a forward look at results based growth of KM capabilities with-in the MSFC PSD.
NASA Technical Reports Server (NTRS)
Caraccioli, Paul; Varnedoe, Tom; Smith, Randy; McCarter, Mike; Wilson, Barry; Porter, Richard
2006-01-01
NASA Marshall Space Flight Center's Propulsion Systems Department (PSD) is four months into a fifteen month Knowledge Management (KM) initiative to support enhanced engineering decision making and analyses, faster resolution of anomalies (near-term) and effective, efficient knowledge infused engineering processes, reduced knowledge attrition, and reduced anomaly occurrences (long-term). The near-term objective of this initiative is developing a KM Pilot project, within the context of a 3-5 year KM strategy, to introduce and evaluate the use of KM within PSD. An internal NASA/MSFC PSD KM team was established early in project formulation to maintain a practitioner, user-centric focus throughout the conceptual development, planning and deployment of KM technologies and capabilities within the PSD. The PSD internal team is supported by the University of Alabama's Aging Infrastructure Systems Center of Excellence (AISCE), lntergraph Corporation, and The Knowledge Institute. The principle product of the initial four month effort has been strategic planning of PSD KNI implementation by first determining the "as is" state of KM capabilities and developing, planning and documenting the roadmap to achieve the desired "to be" state. Activities undertaken to suppoth e planning phase have included data gathering; cultural surveys, group work-sessions, interviews, documentation review, and independent research. Assessments and analyses have beon pedormed including industry benchmarking, related local and Agency initiatives, specific tools and techniques used and strategies for leveraging existing resources, people and technology to achieve common KM goals. Key findings captured in the PSD KM Strategic Plan include the system vision, purpose, stakeholders, prioritized strategic objectives mapped to the top ten practitioner needs and analysis of current resource usage. Opportunities identified from research, analyses, cultural1KM surveys and practitioner interviews include: executive and senior management sponsorship, KM awareness, promotion and training, cultural change management, process improvement, leveraging existing resources and new innovative technologies to align with other NASA KM initiatives (convergence: the big picture). To enable results based incremental implementation and future growth of the KM initiative, key performance measures have been identified including stakeholder value, system utility, learning and growth (knowledge capture, sharing, reduced anomaly recurrence), cultural change, process improvement and return-on-investment. The next steps for the initial implementation spiral (focused on SSME Turbomachinery) have been identified, largely based on the organization and compilation of summary level engineering process models, data capture matrices, functional models and conceptual-level svstems architecture. Key elements include detailed KM requirements definition, KM technology architecture assessment, - evaluation and selection, deployable KM Pilot design, development, implementation and evaluation, and justifying full implementation (estimated Return-on-Investment). Features identified for the notional system architecture include the knowledge presentation layer (and its components), knowledge network layer (and its components), knowledge storage layer (and its components), User Interface and capabilities. This paper provides a snapshot of the progress to date, the near term planning for deploying the KM pilot project and a forward look at results based growth of KM capabilities with-in the MSFC PSD.
Clinical implementation of intraoperative cone-beam CT in head and neck surgery
NASA Astrophysics Data System (ADS)
Daly, M. J.; Chan, H.; Nithiananthan, S.; Qiu, J.; Barker, E.; Bachar, G.; Dixon, B. J.; Irish, J. C.; Siewerdsen, J. H.
2011-03-01
A prototype mobile C-arm for cone-beam CT (CBCT) has been translated to a prospective clinical trial in head and neck surgery. The flat-panel CBCT C-arm was developed in collaboration with Siemens Healthcare, and demonstrates both sub-mm spatial resolution and soft-tissue visibility at low radiation dose (e.g., <1/5th of a typical diagnostic head CT). CBCT images are available ~15 seconds after scan completion (~1 min acquisition) and reviewed at bedside using custom 3D visualization software based on the open-source Image-Guided Surgery Toolkit (IGSTK). The CBCT C-arm has been successfully deployed in 15 head and neck cases and streamlined into the surgical environment using human factors engineering methods and expert feedback from surgeons, nurses, and anesthetists. Intraoperative imaging is implemented in a manner that maintains operating field sterility, reduces image artifacts (e.g., carbon fiber OR table) and minimizes radiation exposure. Image reviews conducted with surgical staff indicate bony detail and soft-tissue visualization sufficient for intraoperative guidance, with additional artifact management (e.g., metal, scatter) promising further improvements. Clinical trial deployment suggests a role for intraoperative CBCT in guiding complex head and neck surgical tasks, including planning mandible and maxilla resection margins, guiding subcranial and endonasal approaches to skull base tumours, and verifying maxillofacial reconstruction alignment. Ongoing translational research into complimentary image-guidance subsystems include novel methods for real-time tool tracking, fusion of endoscopic video and CBCT, and deformable registration of preoperative volumes and planning contours with intraoperative CBCT.
Des Moines metropolitan area ITS strategic plan
DOT National Transportation Integrated Search
1998-08-19
The Des Moines Area Metropolitan Organization (MPO) completed an early deployment study for the Des Moines metropolitan area in late 1997. The purpose of the study was to develop a strategic plan for Intelligent Transportation Systems (ITS) deploymen...
Region 4 ATMS local evaluation report
DOT National Transportation Integrated Search
2005-07-01
In March, 1996, the Rochester Areawide Advanced Transportation Management System Report (6) established the need for an ITS as well as a strategic implementation/deployment plan. This plan has, in part, been implemented through the design and constru...
Transportation planning for electric vehicles and associated infrastructure.
DOT National Transportation Integrated Search
2017-05-01
Planning is the key to successful adoption and deployment of any new technology, and : it is particularly important when that advancement involves a paradigm shift such as : electrified transportation. At its core, electric transportation is largely ...
Missile Defense: A New Media Campaign
2002-04-09
plan is inadequate for engendering support for deploying a BMD system. This paper will focus on a new marketing strategy and plan. The arguments of opponents of MD, the threat, and a new strategy will all be discussed.
ERIC Educational Resources Information Center
Martinez-Maldonado, Roberto; Pardo, Abelardo; Mirriahi, Negin; Yacef, Kalina; Kay, Judy; Clayphan, Andrew
2015-01-01
Designing, validating, and deploying learning analytics tools for instructors or students is a challenge that requires techniques and methods from different disciplines, such as software engineering, human-computer interaction, computer graphics, educational design, and psychology. Whilst each has established its own design methodologies, we now…
Self-Selection as a Tool for Managing the Demands on Department of Defense (DOD) Personnel
2010-11-01
required to sustain the force in the face of heavy deployment duties. The Services are, in the main, succeeding in recruiting and retaining service...deployment data for September 2009 identified 240 occupations where heavy deployments continued to deplete the pool of service members who can be...environment as a source of stress for service members and uncertainty as a source of personal stress for both service members and their families. In addition
Mixed-Initiative Planning in MAPGEN: Capabilities and Shortcomings
NASA Technical Reports Server (NTRS)
Bresina, John L.; Jonsson, Ari K.; Morris, Paul H.; Rajan, Kanna
2005-01-01
MAPGEN (Mixed-initiative Activity Plan GENerator) is a mixed-initiative system that employs automated constraint-based planning, scheduling, and temporal reasoning to assist the Mars Exploration Rover mission operations staff in generating the daily activity plans. This paper describes the mixed-initiative capabilities of MAPGEN, identifies shortcomings with the deployed system, and discusses ongoing work to address some of these shortcomings.
NASA Astrophysics Data System (ADS)
Turner, Sean
2015-04-01
Water resources planning is a complex and challenging discipline in which decision makers must deal with conflicting objectives, contested socio-economic values and vast uncertainties, including long term hydrological variability. The task is arguably more demanding in England and Wales, where private water companies must adhere to a rigid set of regulatory planning guidelines in order to justify new infrastructural investments. These guidelines prescribe a "capacity expansion" approach to planning: ensure that a deterministic measure of supply, known as "Deployable Output," meets projected demand over a 25-year planning horizon. Deployable Output is derived using a method akin to yield analysis and is commensurate with the maximum rate of supply that a water resources system can sustain without incurring failure under a simulation of historical recorded hydrological conditions. This study examines whether Deployable Output analysis is fit to serve an industry in which: water companies are seeking to invest in cross-company water transfer schemes to deal with loss of water availability brought about by European environmental legislation and an increase in demand driven by population growth; water companies are expected address potential climate change impacts through their planning activities; and regulators wish to benchmark water resource system performance across the separate companies. Of particular interest, then, is the adequacy of Deployable Output analysis as a means to measuring current and future water shortage risk and comparing across supply systems. Data from the UK National River Flow Archive are used to develop a series of hypothetical reservoir systems in two hydrologically contrasting regions -- northwest England/north Wales and Southeast England. The systems are varied by adjusting the draft ratio (ratio of target annual demand to mean annual inflow), the inflow diversity (covariance of streamflow sequences supplying the system), the strength of interconnectivity in the system (water transfer capability as proportion of demand), and the proportion of the target demand that can be drafted from climate-independent supply sources (such as plentiful groundwater supplies or desalination). The reservoir capacities are then adjusted such that all systems are perfectly and equally balanced under current design standards (Deployable Output equals demand) before being subjected to comprehensive reliability, resilience, vulnerability analysis using stochastically-derived replicates of the inflow sequences. Results indicate significant discrepancies in performance, highlighting major deficiencies with the currently-accepted planning metrics as a means to measuring and comparing water shortage risk across supply systems. These discrepancies are evident in both regions examined. The work highlights a need for a reassessment of the prescribed planning methodology to better reflect aspects of water shortage risk, particularly resilience and vulnerability.
Capturing the Impact of Storage and Other Flexible Technologies on Electric System Planning
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hale, Elaine; Stoll, Brady; Mai, Trieu
Power systems of the future are likely to require additional flexibility. This has been well studied from an operational perspective, but has been more difficult to incorporate into capacity expansion models (CEMs) that study investment decisions on the decadal scale. There are two primary reasons for this. First, the necessary input data, including cost and resource projections, for flexibility options like demand response and storage are significantly uncertain. Second, it is computationally difficult to represent both investment and operational decisions in detail, the latter being necessary to properly value system flexibility, in CEMs for realistically sized systems. In this work,more » we extend a particular CEM, NREL's Resource Planning Model (RPM), to address the latter issue by better representing variable generation impacts on operations, and then adding two flexible technologies to RPM's suite of investment decisions: interruptible load and utility-scale storage. This work does not develop full suites of input data for these technologies, but is rather methodological and exploratory in nature. We thus exercise these new investment decisions in the context of exploring price points and value streams needed for significant deployment in the Western Interconnection by 2030. Our study of interruptible load finds significant variation by location, year, and overall system conditions. Some locations find no system need for interruptible load even with low costs, while others build the most expensive resources offered. System needs can include planning reserve capacity needs to ensure resource adequacy, but there are also particular cases in which spinning reserve requirements drive deployment. Utility-scale storage is found to require deep cost reductions to achieve wide deployment and is found to be more valuable in some locations with greater renewable deployment. Differences between more solar- and wind-reliant regions are also found: Storage technologies with lower energy capacities are deployed to support solar deployment, and higher energy capacity technologies support wind. Finally, we identify potential future research and areas of improvement to build on this initial analysis.« less
NASA Astrophysics Data System (ADS)
Hoebelheinrich, N. J.; Lynnes, C.; West, P.; Ferritto, M.
2014-12-01
Two problems common to many geoscience domains are the difficulties in finding tools to work with a given dataset collection, and conversely, the difficulties in finding data for a known tool. A collaborative team from the Earth Science Information Partnership (ESIP) has gotten together to design and create a web service, called ToolMatch, to address these problems. The team began their efforts by defining an initial, relatively simple conceptual model that addressed the two uses cases briefly described above. The conceptual model is expressed as an ontology using OWL (Web Ontology Language) and DCterms (Dublin Core Terms), and utilizing standard ontologies such as DOAP (Description of a Project), FOAF (Friend of a Friend), SKOS (Simple Knowledge Organization System) and DCAT (Data Catalog Vocabulary). The ToolMatch service will be taking advantage of various Semantic Web and Web standards, such as OpenSearch, RESTful web services, SWRL (Semantic Web Rule Language) and SPARQL (Simple Protocol and RDF Query Language). The first version of the ToolMatch service was deployed in early fall 2014. While more complete testing is required, a number of communities besides ESIP member organizations have expressed interest in collaborating to create, test and use the service and incorporate it into their own web pages, tools and / or services including the USGS Data Catalog service, DataONE, the Deep Carbon Observatory, Virtual Solar Terrestrial Observatory (VSTO), and the U.S. Global Change Research Program. In this session, presenters will discuss the inception and development of the ToolMatch service, the collaborative process used to design, refine, and test the service, and future plans for the service.
Wade, S.; Greenberg, S.
2009-01-01
This paper introduces the concept of social site characterization as a parallel effort to technical site characterization to be used in evaluating and planning carbon dioxides capture and storage (CCS) projects. Social site characterization, much like technical site characterization, relies on a series of iterative investigations into public attitudes towards a CCS project and the factors that will shape those views. This paper also suggests ways it can be used to design approaches for actively engaging stakeholders and communities in the deployment of CCS projects. This work is informed by observing the site selection process for FutureGen and the implementation of research projects under the Regional Carbon Sequestration Partnership Program. ?? 2009 Elsevier Ltd. All rights reserved.
3D Extended Logging for Geothermal Resources: Field Trials with the Geo-Bilt System
DOE Office of Scientific and Technical Information (OSTI.GOV)
Mallan, R; Wilt, M; Kirkendall, B
2002-05-29
Geo-BILT (Geothermal Borehole Induction Logging Tool) is an extended induction logging tool designed for 3D resistivity imaging around a single borehole. The tool was developed for deployment in high temperature geothermal wells under a joint program funded by the California Energy Commission, Electromagnetic Instruments (EMI) and the U.S. Department of Energy. EM1 was responsible for tool design and manufacture, and numerical modeling efforts were being addressed at Lawrence Livermore Laboratory (LLNL) and other contractors. The field deployment was done by EM1 and LLNL. The tool operates at frequencies from 2 to 42 kHz, and its design features a series ofmore » three-component magnetic sensors offset at 2 and 5 meters from a three-component magnetic source. The combined package makes it possible to do 3D resistivity imaging, deep into the formation, from a single well. The manufacture and testing of the tool was completed in spring of 2001, and the initial deployment of Geo-BILT occurred in May 2001 at the Lost Hills oil field in southern California at leases operated by Chevron USA. This site was chosen for the initial field test because of the favorable geological conditions and the availability of a number of wells suitable for tool deployment. The second deployment occurred in April 2002 at the Dixie Valley geothermal field, operated by Caithness Power LLC, in central Nevada. This constituted the first test in a high temperature environment. The Chevron site features a fiberglass-cased observation well in the vicinity of a water injector. The injected water, which is used for pressure maintenance and for secondary sweep of the heavy oil formation, has a much lower resistivity than the oil bearing formation. This, in addition to the non-uniform flow of this water, creates a 3D resistivity structure, which is analogous to conditions produced from flowing fractures adjacent to geothermal boreholes. Therefore, it is an excellent site for testing the 3D capability of the tool in a low risk environment. The Dixie Valley site offered an environment where the tool could locate near-well fractures associated with steam development. The Lost Hills field measurements yielded a data set suitable for 3D imaging. The Geo-BLT data corresponded to existing conventional logging data and showed clear indications, in several depth intervals, of near-well 3D structure. Subsequent 3D inversion of these data produced a model consistent with non-planar water flow in specific layers. The Dixie Valley measurements identified structures associated with dike intrusions and water inflow at particular depths. Preliminary analysis suggests these structures are steeply dipping, which is consistent with the geology.« less
Pratt, Abigail; Dale, Martin; Olivi, Elena; Miller, Jane
2014-12-01
In late 2012 and in conjunction with South Sudan's Ministry of Health - National Malaria Control Program, PSI (Population Services International) conducted a comprehensive mapping exercise to assess geographical coverage of its integrated community case management (iCCM) program and consider scope for expansion. The operational research was designed to provide evidence and support for low-cost mapping and monitoring systems, demonstrating the use of technology to enhance the quality of programming and to allow for the improved allocation of resources through appropriate and need-based deployment of community-based distributors (CBDs). The survey took place over the course of three months and program staff gathered GPS (global positioning system) data, along with demographic data, for over 1200 CBDs and 111 CBD supervisors operating in six counties in South Sudan. Data was collated, cleaned and quality assured, input into an Excel database, and subsequently uploaded to geographic information system (GIS) for spatial analysis and map production. The mapping results showed that over three-quarters of CBDs were deployed within a five kilometer radius of a health facility or another CBD, contrary to program planning and design. Other characteristics of the CBD and CBD supervisor profiles (age, gender, literacy) were more closely matched with other regional programs. The results of this mapping exercise provided a valuable insight into the contradictions found between a program "deployment plan" and the realities observed during field implementation. It also highlighted an important need for program implementers and national-level strategy makers to consider the natural and community-driven diffusion of CBDs, and take into consideration the strength of the local health facilities when developing a deployment plan.
Making ITS/CVO happen : Pennsylvania's ITS/CVO business plan
DOT National Transportation Integrated Search
1998-12-31
This business plan will be used to coordinate the deployment of CVO technologies in Pennsylvania. It provides a 'roadmap' for Pennsylvania's ITS/CVO program by defining broad goals and objectives, as well as specific projects, milestones, responsibil...
South Dakota ITS/CVO business plan
DOT National Transportation Integrated Search
1998-01-01
This report defines an ITS/CVO program for the State of South Dakota. It is a Business Plan to guide the deployment of Intelligent Transportation Systems (ITS) technology for improving commercial vehicle operations (CVO) in South Dakota. This ITS/CVO...
Seattle To Portland Inter-City ITS Corridor Study And Communications Plan, Final Report
DOT National Transportation Integrated Search
1996-03-01
THIS DOCUMENT IS THE FINAL REPORT PRESENTING THE SEATTLE TO PORTLAND INTELLIGENT TRANSPORTATION SYSTEM (ITS) EARLY DEPLOYMENT PLAN. THE FINAL REPORT SYNTHESIZES INFORMATION FROM TECHNICAL MEMORANDUMS 1 THROUGH 5; INCLUDING EXISTING AND FUTURE CONDITI...
Investigating the respiratory health of deployed military personnel.
Morris, Michael J; Zacher, Lisa L; Jackson, David A
2011-10-01
Recent news media articles have implied a direct relationship between environmental exposures such as burn pits during current deployments and the development of serious and debilitating chronic pulmonary disease. These articles suggest that the military is superficially investigating evidence that establishes a link between deployment and development of chronic lung disease. Anecdotal cases of military personnel with lung disease are detailed to suggest a systemic problem with undiagnosed and untreated pulmonary disease in deployed service members. Despite these contentions, the U.S. Army Medical Department and other agencies have been actively pursuing numerous scientific investigations into deployment-related lung disease to define the severity and prevalence of the issue. This article will review relevant research efforts by the U.S. military in the existing medical literature and address the current efforts planned by the services to systematically investigate the possibility of deployment-related pulmonary disease.
Readiness: observations and comments from a medical team deployment.
Popper, S E; Noble, D E; Mason, L J; Schaffer, L A; Glover, J G; Barkley, M S
1997-02-01
The evolving strategy of the United States in dealing with the changing world order calls for a force structure capable of fighting and winning two nearly simultaneous major regional conflicts and conducting a range of other military operations. Readiness is a key factor in this new strategy. Consequently, major paradigm shifts are occurring within the Air Force Medical Service. Maintaining current and accurate medical records on personnel to meet deployment requirements is a significant challenge. Historically, time and resources are consumed determining the deployability of troops prior to a deployment. This adds to the cost of doing business and increases the time required to clear the deploying team, even though there is an established process to avoid these very problems. The experience of a recent medical team deployment to Bosnia is discussed. Future directions given the implementation of TRI-CARE, the Preventive Health Assessment Program, and the Strategic Health Resourcing Plan are also considered.
Sampling Approaches for Multi-Domain Internet Performance Measurement Infrastructures
DOE Office of Scientific and Technical Information (OSTI.GOV)
Calyam, Prasad
2014-09-15
The next-generation of high-performance networks being developed in DOE communities are critical for supporting current and emerging data-intensive science applications. The goal of this project is to investigate multi-domain network status sampling techniques and tools to measure/analyze performance, and thereby provide “network awareness” to end-users and network operators in DOE communities. We leverage the infrastructure and datasets available through perfSONAR, which is a multi-domain measurement framework that has been widely deployed in high-performance computing and networking communities; the DOE community is a core developer and the largest adopter of perfSONAR. Our investigations include development of semantic scheduling algorithms, measurement federationmore » policies, and tools to sample multi-domain and multi-layer network status within perfSONAR deployments. We validate our algorithms and policies with end-to-end measurement analysis tools for various monitoring objectives such as network weather forecasting, anomaly detection, and fault-diagnosis. In addition, we develop a multi-domain architecture for an enterprise-specific perfSONAR deployment that can implement monitoring-objective based sampling and that adheres to any domain-specific measurement policies.« less
NASA Technical Reports Server (NTRS)
Cleveland, Paul E.; Parrish, Keith A.
2005-01-01
A thorough and unique thermal verification and model validation plan has been developed for NASA s James Webb Space Telescope. The JWST observatory consists of a large deployed aperture optical telescope passively cooled to below 50 Kelvin along with a suite of several instruments passively and actively cooled to below 37 Kelvin and 7 Kelvin, respectively. Passive cooling to these extremely low temperatures is made feasible by the use of a large deployed high efficiency sunshield and an orbit location at the L2 Lagrange point. Another enabling feature is the scale or size of the observatory that allows for large radiator sizes that are compatible with the expected power dissipation of the instruments and large format Mercury Cadmium Telluride (HgCdTe) detector arrays. This passive cooling concept is simple, reliable, and mission enabling when compared to the alternatives of mechanical coolers and stored cryogens. However, these same large scale observatory features, which make passive cooling viable, also prevent the typical flight configuration fully-deployed thermal balance test that is the keystone to most space missions thermal verification plan. JWST is simply too large in its deployed configuration to be properly thermal balance tested in the facilities that currently exist. This reality, when combined with a mission thermal concept with little to no flight heritage, has necessitated the need for a unique and alternative approach to thermal system verification and model validation. This paper describes the thermal verification and model validation plan that has been developed for JWST. The plan relies on judicious use of cryogenic and thermal design margin, a completely independent thermal modeling cross check utilizing different analysis teams and software packages, and finally, a comprehensive set of thermal tests that occur at different levels of JWST assembly. After a brief description of the JWST mission and thermal architecture, a detailed description of the three aspects of the thermal verification and model validation plan is presented.
The Experiment Factory: Standardizing Behavioral Experiments.
Sochat, Vanessa V; Eisenberg, Ian W; Enkavi, A Zeynep; Li, Jamie; Bissett, Patrick G; Poldrack, Russell A
2016-01-01
The administration of behavioral and experimental paradigms for psychology research is hindered by lack of a coordinated effort to develop and deploy standardized paradigms. While several frameworks (Mason and Suri, 2011; McDonnell et al., 2012; de Leeuw, 2015; Lange et al., 2015) have provided infrastructure and methods for individual research groups to develop paradigms, missing is a coordinated effort to develop paradigms linked with a system to easily deploy them. This disorganization leads to redundancy in development, divergent implementations of conceptually identical tasks, disorganized and error-prone code lacking documentation, and difficulty in replication. The ongoing reproducibility crisis in psychology and neuroscience research (Baker, 2015; Open Science Collaboration, 2015) highlights the urgency of this challenge: reproducible research in behavioral psychology is conditional on deployment of equivalent experiments. A large, accessible repository of experiments for researchers to develop collaboratively is most efficiently accomplished through an open source framework. Here we present the Experiment Factory, an open source framework for the development and deployment of web-based experiments. The modular infrastructure includes experiments, virtual machines for local or cloud deployment, and an application to drive these components and provide developers with functions and tools for further extension. We release this infrastructure with a deployment (http://www.expfactory.org) that researchers are currently using to run a set of over 80 standardized web-based experiments on Amazon Mechanical Turk. By providing open source tools for both deployment and development, this novel infrastructure holds promise to bring reproducibility to the administration of experiments, and accelerate scientific progress by providing a shared community resource of psychological paradigms.
The Experiment Factory: Standardizing Behavioral Experiments
Sochat, Vanessa V.; Eisenberg, Ian W.; Enkavi, A. Zeynep; Li, Jamie; Bissett, Patrick G.; Poldrack, Russell A.
2016-01-01
The administration of behavioral and experimental paradigms for psychology research is hindered by lack of a coordinated effort to develop and deploy standardized paradigms. While several frameworks (Mason and Suri, 2011; McDonnell et al., 2012; de Leeuw, 2015; Lange et al., 2015) have provided infrastructure and methods for individual research groups to develop paradigms, missing is a coordinated effort to develop paradigms linked with a system to easily deploy them. This disorganization leads to redundancy in development, divergent implementations of conceptually identical tasks, disorganized and error-prone code lacking documentation, and difficulty in replication. The ongoing reproducibility crisis in psychology and neuroscience research (Baker, 2015; Open Science Collaboration, 2015) highlights the urgency of this challenge: reproducible research in behavioral psychology is conditional on deployment of equivalent experiments. A large, accessible repository of experiments for researchers to develop collaboratively is most efficiently accomplished through an open source framework. Here we present the Experiment Factory, an open source framework for the development and deployment of web-based experiments. The modular infrastructure includes experiments, virtual machines for local or cloud deployment, and an application to drive these components and provide developers with functions and tools for further extension. We release this infrastructure with a deployment (http://www.expfactory.org) that researchers are currently using to run a set of over 80 standardized web-based experiments on Amazon Mechanical Turk. By providing open source tools for both deployment and development, this novel infrastructure holds promise to bring reproducibility to the administration of experiments, and accelerate scientific progress by providing a shared community resource of psychological paradigms. PMID:27199843
United States Military Posture for FY 1987
1987-01-01
monitor, plan, and execute mobilization, deployment, employment, and sustainment during peace, crisis, and war. JOPES requirements are being developed ...positioning 68 Deployment Management 69 VI Sustainability 69 Ammunition 69 Petroleum, Oils, and Lubricants 69 Military Construction 69...Commanders in Chiefs 73 Joint Doctrine 73 Combined Doctrine 74 Joint Force Development Process 74 Joint Resource Assessment 75 Joint Program
ADOPT: Automotive Deployment Options Projection Tool | Transportation
new model options by combining high-selling powertrains and high-selling vehicle platforms. NREL has . Screenshot of the ADOPT user interface, with two simulation scenario options (low tech and high tech emissions. Biomass Market Dynamics Supporting the Large-Scale Deployment of High-Octane Fuel Production in
I-15 integrated corridor management system : project management plan.
DOT National Transportation Integrated Search
2011-06-01
The Project Management Plan (PMP) assists the San Diego ICM Team by defining a procedural framework for management and control of the I-15 Integrated Corridor Management Demonstration Project, and development and deployment of the ICM System. The PMP...
South Dakota ITS/CVO business plan : executive summary
DOT National Transportation Integrated Search
1998-01-19
This report defines an ITS/CVO program for the State of South Dakota. It is a Business Plan to guide the deployment of Intelligent Transportation Systems (ITS) technology for improving commercial vehicle operations (CVO) in South Dakota. This ITS/CVO...
DOT National Transportation Integrated Search
1993-01-01
The Virginia Department of Transportation (VDOT) is committed to Virginia PROGRESS, which is a program for Intelligent Vehicle-Highway System (IVHS) research, development, and deployment. This document, VDOT's IVHS Strategic Plan, will guide the Depa...
Des Moines metropolitan area ITS strategic plan
DOT National Transportation Integrated Search
1997-12-01
The purpose of this document is to report on the conclusions of the Intelligent Transportation Systems (ITS) Early Deployment Study (EDS) for the Des Moines metropolitan area. The objective of the study was to develop a strategic plan for the develop...
Fienen, Michael N.; Kunicki, Thomas C.; Kester, Daniel E.
2011-01-01
This report documents cloudPEST-a Python module with functions to facilitate deployment of the model-independent parameter estimation code PEST on a cloud-computing environment. cloudPEST makes use of low-level, freely available command-line tools that interface with the Amazon Elastic Compute Cloud (EC2(TradeMark)) that are unlikely to change dramatically. This report describes the preliminary setup for both Python and EC2 tools and subsequently describes the functions themselves. The code and guidelines have been tested primarily on the Windows(Registered) operating system but are extensible to Linux(Registered).
Moran, Jean M; Feng, Mary; Benedetti, Lisa A; Marsh, Robin; Griffith, Kent A; Matuszak, Martha M; Hess, Michael; McMullen, Matthew; Fisher, Jennifer H; Nurushev, Teamour; Grubb, Margaret; Gardner, Stephen; Nielsen, Daniel; Jagsi, Reshma; Hayman, James A; Pierce, Lori J
A database in which patient data are compiled allows analytic opportunities for continuous improvements in treatment quality and comparative effectiveness research. We describe the development of a novel, web-based system that supports the collection of complex radiation treatment planning information from centers that use diverse techniques, software, and hardware for radiation oncology care in a statewide quality collaborative, the Michigan Radiation Oncology Quality Consortium (MROQC). The MROQC database seeks to enable assessment of physician- and patient-reported outcomes and quality improvement as a function of treatment planning and delivery techniques for breast and lung cancer patients. We created tools to collect anonymized data based on all plans. The MROQC system representing 24 institutions has been successfully deployed in the state of Michigan. Since 2012, dose-volume histogram and Digital Imaging and Communications in Medicine-radiation therapy plan data and information on simulation, planning, and delivery techniques have been collected. Audits indicated >90% accurate data submission and spurred refinements to data collection methodology. This model web-based system captures detailed, high-quality radiation therapy dosimetry data along with patient- and physician-reported outcomes and clinical data for a radiation therapy collaborative quality initiative. The collaborative nature of the project has been integral to its success. Our methodology can be applied to setting up analogous consortiums and databases. Copyright © 2016 American Society for Radiation Oncology. Published by Elsevier Inc. All rights reserved.
NASA Technical Reports Server (NTRS)
Wercinski, Paul F.
2017-01-01
The ADEPT architecture represents a completely new approach for entry vehicle design using a high-performance carbon fabric to serve as the primary drag surface of the mechanically deployed decelerator and to protect the payload from hypersonic aerothermal heating during entry. The initial system-level development of the nano-ADEPT architecture will culminate in the launch of a 0.7-m deployed diameter ADEPT sounding rocket flight experiment. The SR-1 sounding rocket flight experiment is a critical milestone in the technology maturation plan for ADEPT and will generate performance data on in-space deployment and aerodynamic stability.
A Collaborative Decision Environment for UAV Operations
NASA Technical Reports Server (NTRS)
D'Ortenzio, Matthew V.; Enomoto, Francis Y.; Johan, Sandra L.
2005-01-01
NASA is developing Intelligent Mission Management (IMM) technology for science missions employing long endurance unmanned aerial vehicles (UAV's). The IMM groundbased component is the Collaborative Decision Environment (CDE), a ground system that provides the Mission/Science team with situational awareness, collaboration, and decisionmaking tools. The CDE is used for pre-flight planning, mission monitoring, and visualization of acquired data. It integrates external data products used for planning and executing a mission, such as weather, satellite data products, and topographic maps by leveraging established and emerging Open Geospatial Consortium (OGC) standards to acquire external data products via the Internet, and an industry standard geographic information system (GIs) toolkit for visualization As a Science/Mission team may be geographically dispersed, the CDE is capable of providing access to remote users across wide area networks using Web Services technology. A prototype CDE is being developed for an instrument checkout flight on a manned aircraft in the fall of 2005, in preparation for a full deployment in support of the US Forest Service and NASA Ames Western States Fire Mission in 2006.
Component Database for the APS Upgrade
DOE Office of Scientific and Technical Information (OSTI.GOV)
Veseli, S.; Arnold, N. D.; Jarosz, D. P.
The Advanced Photon Source Upgrade (APS-U) project will replace the existing APS storage ring with a multi-bend achromat (MBA) lattice to provide extreme transverse coherence and extreme brightness x-rays to its users. As the time to replace the existing storage ring accelerator is of critical concern, an aggressive one-year removal/installation/testing period is being planned. To aid in the management of the thousands of components to be installed in such a short time, the Component Database (CDB) application is being developed with the purpose to identify, document, track, locate, and organize components in a central database. Three major domains are beingmore » addressed: Component definitions (which together make up an exhaustive "Component Catalog"), Designs (groupings of components to create subsystems), and Component Instances (“Inventory”). Relationships between the major domains offer additional "system knowledge" to be captured that will be leveraged with future tools and applications. It is imperative to provide sub-system engineers with a functional application early in the machine design cycle. Topics discussed in this paper include the initial design and deployment of CDB, as well as future development plans.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Werling, Eric
This report presents the Building America Research-to-Market Plan (Plan), including the integrated Building America Technology-to-Market Roadmaps (Roadmaps) that will guide Building America’s research, development, and deployment (RD&D) activities over the coming years. The Plan and Roadmaps will be updated as necessary to adapt to research findings and evolving stakeholder needs, and they will reflect input from DOE and stakeholders.
TQM and lean strategy deployment in Italian hospitals.
Chiarini, Andrea; Baccarani, Claudio
2016-10-03
Purpose This paper aims to contribute to the debate concerning total quality management (TQM)-Lean strategy in public healthcare by analyzing the deployment path for implementation, the possible benefits that can be achieved and the encountered pitfalls. Design/methodology/approach Three case studies are drawn from three large Italian hospitals with more than 500 beds each and structured with many departments. The hospitals are located in Tuscany, Italy. These three hospitals have embraced TQM and Lean, starting from strategic objectives and their deployment. At the same time, they have also implemented many TQM-Lean tools. The case studies are based on interviews held with four managers in each of these three public hospitals. Findings Results from the interviews show that there is a specific deployment path for TQM-Lean implementation. The hospitals have also achieved benefits linked to patient satisfaction and improved organizational performances. Problems related to organizational and cultural issues, such as senior managers' commitment, staff management, manufacturing culture and tools adaptation, could affect the benefits. Research limitations/implications The research has been carried out in just three Italian public hospitals. Hence, similar investigations could be managed in other countries. Researchers could also use a larger sample and investigate these issues by means of quantitative inquiry. Practical implications Practitioners could try to apply the deployment path revealed by these case studies in other public and private hospitals. Originality/value The results of this research show that there is a specific, new deployment path for implementing TQM-Lean strategy in some public hospitals.
An Autonomous Data Reduction Pipeline for Wide Angle EO Systems
NASA Astrophysics Data System (ADS)
Privett, G.; George, S.; Feline, W.; Ash, A.; Routledge, G.
The UK’s National Space and Security Policy states that the identification of potential on-orbit collisions and re-entry warning over the UK is of high importance, and is driving requirements for indigenous Space Situational Awareness (SSA) systems. To meet these requirements options are being examined, including the creation of a distributed network of simple, low cost commercial–off-the-shelf electro-optical sensors to support survey work and catalogue maintenance. This paper outlines work at Dstl examining whether data obtained using readily-deployable equipment could significantly enhance UK SSA capability and support cross-cueing between multiple deployed systems. To effectively exploit data from this distributed sensor architecture, a data handling system is required to autonomously detect satellite trails in a manner that pragmatically handles highly variable target intensities, periodicity and rates of apparent motion. The processing and collection strategies must be tailored to specific mission sets to ensure effective detections of platforms as diverse as stable geostationary satellites and low altitude CubeSats. Data captured during the Automated Transfer Vehicle-5 (ATV-5) de-orbit trial and images captured of a rocket body break up and a deployed deorbit sail have been employed to inform the development of a prototype processing pipeline for autonomous on-site processing. The approach taken employs tools such as Astrometry.Net and DAOPHOT from the astronomical community, together with image processing and orbit determination software developed inhouse by Dstl. Interim results from the automated analysis of data collected from wide angle sensors are described, together with the current perceived limitations of the proposed system and our plans for future development.
ERIC Educational Resources Information Center
Denton, J. J.; Denton, M. H.; Kavanagh, A. J.; Harron, H.; Ulich, T.; Denton, J. S.
2012-01-01
We report on a school-university collaboration to involve students in the deployment, testing, and operation of a very low frequency (VLF) radio receiver as part of an international network of such experiments. A background to the collaboration is presented, along with a summary of planning and development, and the ultimate deployment of the…
Logistics Handbook for Strategic Mobility Planning
1994-04-01
tion 83 E. Flatrack Characteristics 85 F. Seashed Characteristics 88 G. Equipment Deployment and Storage Systems (EDSS) 88 H. Palletized Load...Equipment Deployment and Storage Systems (EDSS) 94 41 Containerizable Unit Equipment 97 42 Mobilization Station to Inland Waterway Dock Mileage 101...passengers worldwide, and the DOD Worldwide Personal Property Movement and Storage Program. 15 MTMC also provides interface between military shippers
Yohan Lee; Jeremy S. Fried; Heidi J. Albers; Robert G. Haight
2013-01-01
We combine a scenario-based, standard-response optimization model with stochastic simulation to improve the efficiency of resource deployment for initial attack on wildland fires in three planning units in California. The optimization model minimizes the expected number of fires that do not receive a standard response--defined as the number of resources by type that...
Implementation of Cyberinfrastructure and Data Management Workflow for a Large-Scale Sensor Network
NASA Astrophysics Data System (ADS)
Jones, A. S.; Horsburgh, J. S.
2014-12-01
Monitoring with in situ environmental sensors and other forms of field-based observation presents many challenges for data management, particularly for large-scale networks consisting of multiple sites, sensors, and personnel. The availability and utility of these data in addressing scientific questions relies on effective cyberinfrastructure that facilitates transformation of raw sensor data into functional data products. It also depends on the ability of researchers to share and access the data in useable formats. In addition to addressing the challenges presented by the quantity of data, monitoring networks need practices to ensure high data quality, including procedures and tools for post processing. Data quality is further enhanced if practitioners are able to track equipment, deployments, calibrations, and other events related to site maintenance and associate these details with observational data. In this presentation we will describe the overall workflow that we have developed for research groups and sites conducting long term monitoring using in situ sensors. Features of the workflow include: software tools to automate the transfer of data from field sites to databases, a Python-based program for data quality control post-processing, a web-based application for online discovery and visualization of data, and a data model and web interface for managing physical infrastructure. By automating the data management workflow, the time from collection to analysis is reduced and sharing and publication is facilitated. The incorporation of metadata standards and descriptions and the use of open-source tools enhances the sustainability and reusability of the data. We will describe the workflow and tools that we have developed in the context of the iUTAH (innovative Urban Transitions and Aridregion Hydrosustainability) monitoring network. The iUTAH network consists of aquatic and climate sensors deployed in three watersheds to monitor Gradients Along Mountain to Urban Transitions (GAMUT). The variety of environmental sensors and the multi-watershed, multi-institutional nature of the network necessitate a well-planned and efficient workflow for acquiring, managing, and sharing sensor data, which should be useful for similar large-scale and long-term networks.
National Fusion Collaboratory: Grid Computing for Simulations and Experiments
NASA Astrophysics Data System (ADS)
Greenwald, Martin
2004-05-01
The National Fusion Collaboratory Project is creating a computational grid designed to advance scientific understanding and innovation in magnetic fusion research by facilitating collaborations, enabling more effective integration of experiments, theory and modeling and allowing more efficient use of experimental facilities. The philosophy of FusionGrid is that data, codes, analysis routines, visualization tools, and communication tools should be thought of as network available services, easily used by the fusion scientist. In such an environment, access to services is stressed rather than portability. By building on a foundation of established computer science toolkits, deployment time can be minimized. These services all share the same basic infrastructure that allows for secure authentication and resource authorization which allows stakeholders to control their own resources such as computers, data and experiments. Code developers can control intellectual property, and fair use of shared resources can be demonstrated and controlled. A key goal is to shield scientific users from the implementation details such that transparency and ease-of-use are maximized. The first FusionGrid service deployed was the TRANSP code, a widely used tool for transport analysis. Tools for run preparation, submission, monitoring and management have been developed and shared among a wide user base. This approach saves user sites from the laborious effort of maintaining such a large and complex code while at the same time reducing the burden on the development team by avoiding the need to support a large number of heterogeneous installations. Shared visualization and A/V tools are being developed and deployed to enhance long-distance collaborations. These include desktop versions of the Access Grid, a highly capable multi-point remote conferencing tool and capabilities for sharing displays and analysis tools over local and wide-area networks.
Mallon, Col Timothy M; Rohrbeck, Maj Patricia; Haines, Maj Kevin M; Jones, Dean P; Utell, Mark; Hopke, Philip K; Phipps, Richard P; Walker, Douglas I; Thatcher, Thomas; Woeller, Collynn F; Baird, Coleen P; Pollard, Harvey B; Dalgard, Clifton L; Gaydos, Joel C
2016-08-01
This paper provides an overview of our study that was designed to assess the health impact of environmental exposures to open pit burning in deployed troops. The rationale for the study and the structure of the research plan was laid out. An overview of each article in the supplement was provided. The cohort of deployed Service members was assessed for airborne exposure, relevant biomarkers, and health outcomes following deployment to Balad, Iraq, and/or Bagram, Afghanistan. Polycyclic aromatic hydrocarbon (PAH) exposures were elevated, and serum biomarkers were statistically different postdeployment. Associations were noted between PAHs and dioxins and microRNAs. Some health outcomes were evident in deployers compared with nondeployers. Future research will examine the associations between demographic variables, smoking status, biomarker levels, and related health outcomes.
Designing and Deploying Programming Courses: Strategies, Tools, Difficulties and Pedagogy
ERIC Educational Resources Information Center
Xinogalos, Stelios
2016-01-01
Designing and deploying programming courses is undoubtedly a challenging task. In this paper, an attempt to analyze important aspects of a sequence of two courses on imperative-procedural and object-oriented programming in a non-CS majors Department is made. This analysis is based on a questionnaire filled in by fifty students in a voluntary…
Eelgrass is often considered a sentinel species that can be used as an indicator of water clarity and quality. I used the Eelgrass Indicator Deployment System (EIDS) in a series of short term experiments to evaluate eelgrass growth and survival at a decline and a control site in...
[Tools for assisting diagnosis].
Roux, Magali; Asset, Sonya; Medjebar, Samir
2017-11-01
Connected objects are revolutionising practices, fulfil patients' needs for autonomy and the need to deploy healthcare provision beyond healthcare facilities. This article illustrates how these tools can be used in the case of epilepsy. Copyright © 2017 Elsevier Masson SAS. All rights reserved.
Survey Tools for Faculty to Quickly Assess Multidisciplinary Team Dynamics in Capstone Courses
ERIC Educational Resources Information Center
Solnosky, Ryan; Fairchild, Joshua
2017-01-01
Many engineering faculty have limited skills and/or assessment tools to evaluate team dynamics in multidisciplinary team-based capstone courses. Rapidly deployable tools are needed here to provide proactive feedback to teams to facilitate deeper learning. Two surveys were developed based on industrial and organizational psychology theories around…
Framework to parameterize and validate APEX to support deployment of the nutrient tracking tool
USDA-ARS?s Scientific Manuscript database
The Agricultural Policy Environmental eXtender (APEX) model is the scientific basis for the Nutrient Tracking Tool (NTT). NTT is an enhanced version of the Nitrogen Trading Tool, a user-friendly web-based computer program originally developed by the USDA. NTT was developed to estimate reductions in...
Logistics Management: Cases Studies,
LOGISTICS , * MANAGEMENT PLANNING AND CONTROL), DECISION MAKING, INVENTORY CONTROL, SPARE PARTS, AIR FORCE EQUIPMENT, NAVAL AIRCRAFT, MAINTENANCE, DEPLOYMENT, SCHEDULING, SYSTEMS ENGINEERING, TEXTBOOKS
76 FR 13353 - Department of Commerce FY 2011-2016 Strategic Plan
Federal Register 2010, 2011, 2012, 2013, 2014
2011-03-11
... scorecard. A balanced scorecard ``balances'' or equally emphasizes programmatic and management objectives... senior leadership to develop a balanced scorecard to deploy and execute this Strategic Plan. The Secretary directed a balanced scorecard approach to establish and maintain focus on the Department's top...
ITS Early Deployment Study, Richmond/ Tri-Cities Area, User Service Plan
DOT National Transportation Integrated Search
1996-05-01
">THE ESSENCE OF THE ITS PLANNING PROCESS IS TO DEVELOP EACH ITS PROGRAM ON THE BASIS OF THE NEEDS OF THE USERS AND OPERATORS OF THE TRANSPORTATION FACILITIES. ALTHOUGH THE PROCESS IS THE SAME NATIONWIDE, THE RESULTS ARE CUSTOMIZED IN EACH COMMUNITY ...
Connected vehicle pilot deployment program phase 2 : data privacy plan – New York City.
DOT National Transportation Integrated Search
2016-12-27
This document represents a data privacy plan for ensuring the data privacy and security of those participating in the New York City connected vehicle pilot. Personally Identifiable Information (PII) and Sensitive PII (SPII) will be collected from var...
Unmanned Aerial Vehicles Master Plan, 1994. Master Plan.
1994-05-31
Terminal SINCGARS = Single-Channel Ground and Airborne Radio System Figure 3-5 Maneuver Variant CONOPS I Psychological operations. deployment with early...650 KM DAT M 3 K (300 DESIRED) BEYOND FORWARD LINE OF OWN TROOPS (FLOT) APPROXIMATE RADIUS OF ACTION LEGEND ATARS = Advanced Tactical Air
Campbell, Carlene E-A; Khan, Shafiullah; Singh, Dhananjay; Loo, Kok-Keong
2011-01-01
The next generation surveillance and multimedia systems will become increasingly deployed as wireless sensor networks in order to monitor parks, public places and for business usage. The convergence of data and telecommunication over IP-based networks has paved the way for wireless networks. Functions are becoming more intertwined by the compelling force of innovation and technology. For example, many closed-circuit TV premises surveillance systems now rely on transmitting their images and data over IP networks instead of standalone video circuits. These systems will increase their reliability in the future on wireless networks and on IEEE 802.11 networks. However, due to limited non-overlapping channels, delay, and congestion there will be problems at sink nodes. In this paper we provide necessary conditions to verify the feasibility of round robin technique in these networks at the sink nodes by using a technique to regulate multi-radio multichannel assignment. We demonstrate through simulations that dynamic channel assignment scheme using multi-radio, and multichannel configuration at a single sink node can perform close to optimal on the average while multiple sink node assignment also performs well. The methods proposed in this paper can be a valuable tool for network designers in planning network deployment and for optimizing different performance objectives.
Multi-Channel Multi-Radio Using 802.11 Based Media Access for Sink Nodes in Wireless Sensor Networks
Campbell, Carlene E.-A.; Khan, Shafiullah; Singh, Dhananjay; Loo, Kok-Keong
2011-01-01
The next generation surveillance and multimedia systems will become increasingly deployed as wireless sensor networks in order to monitor parks, public places and for business usage. The convergence of data and telecommunication over IP-based networks has paved the way for wireless networks. Functions are becoming more intertwined by the compelling force of innovation and technology. For example, many closed-circuit TV premises surveillance systems now rely on transmitting their images and data over IP networks instead of standalone video circuits. These systems will increase their reliability in the future on wireless networks and on IEEE 802.11 networks. However, due to limited non-overlapping channels, delay, and congestion there will be problems at sink nodes. In this paper we provide necessary conditions to verify the feasibility of round robin technique in these networks at the sink nodes by using a technique to regulate multi-radio multichannel assignment. We demonstrate through simulations that dynamic channel assignment scheme using multi-radio, and multichannel configuration at a single sink node can perform close to optimal on the average while multiple sink node assignment also performs well. The methods proposed in this paper can be a valuable tool for network designers in planning network deployment and for optimizing different performance objectives. PMID:22163883
Buxton, Herbert T.; Andersen, Matthew E.; Focazio, Michael J.; Haines, John W.; Hainly, Robert A.; Hippe, Daniel J.; Sugarbaker, Larry J.
2013-01-01
n late October 2012, Hurricane Sandy came ashore during a spring high tide on the New Jersey coastline, delivering hurricane-force winds, storm tides exceeding 19 feet, driving rain, and plummeting temperatures. Hurricane Sandy resulted in 72 direct fatalities in the mid-Atlantic and northeastern United States, and widespread and substantial physical, environmental, ecological, social, and economic impacts estimated at near $50 billion. Before the landfall of Hurricane Sandy, the USGS provided forecasts of potential coastal change; collected oblique aerial photography of pre-storm coastal morphology; deployed storm-surge sensors, rapid-deployment streamgages, wave sensors, and barometric pressure sensors; conducted Light Detection And Ranging (lidar) aerial topographic surveys of coastal areas; and issued a landslide alert for landslide prone areas. During the storm, Tidal Telemetry Networks provided real-time water-level information along the coast. Long-term network and rapid-deployment real-time streamgages and water-quality monitors reported on river levels and changes in water quality. Immediately after the storm, the USGS serviced real-time instrumentation, retrieved data from over 140 storm-surge sensors, and collected other essential environmental data, including more than 830 high-water marks mapping the extent and elevation of the storm surge. Post-storm lidar surveys documented storm impacts to coastal barriers informing response and recovery and providing a new baseline to assess vulnerability of the reconfigured coast. The USGS Hazard Data Distribution System served storm related information from many agencies on the Internet on a daily basis. This science plan was developed immediately following Hurricane Sandy to coordinate continuing USGS activities with other agencies and to guide continued data collection and analysis to ensure support for recovery and restoration efforts. The data, information, and tools that are produced by implementing this plan will: (1) further characterize impacts and changes, (2) guide mitigation and restoration of impacted communities and ecosystems, (3) inform a redevelopment strategy aimed at developing resilient coastal communities and ecosystems, (4) improve preparedness and responsiveness to the next hurricane or similar coastal disaster, and (5) enable improved hazard assessment, response, and recovery for future storms along the hurricane prone shoreline of the United States. The activities outlined in this plan are organized in five themes based on impact types and information needs. These USGS science themes are: Theme 1: Coastal topography and bathymetry. Theme 2: Impacts to coastal beaches and barriers. Theme 3: Impacts of storm surge and estuarine and bay hydrology. Theme 4: Impacts on environmental quality and persisting contaminant exposures. Theme 5: Impacts to coastal ecosystems, habitats, and fish and wildlife. A major emphasis in the implementation of this plan will be on interacting with stakeholders to better understand their specific data and information needs, to define the best way to make information available, and to support applications of USGS science and expertise to decisionmaking.
Tools for Supporting Distributed Agile Project Planning
NASA Astrophysics Data System (ADS)
Wang, Xin; Maurer, Frank; Morgan, Robert; Oliveira, Josyleuda
Agile project planning plays an important part in agile software development. In distributed settings, project planning is severely impacted by the lack of face-to-face communication and the inability to share paper index cards amongst all meeting participants. To address these issues, several distributed agile planning tools were developed. The tools vary in features, functions and running platforms. In this chapter, we first summarize the requirements for distributed agile planning. Then we give an overview on existing agile planning tools. We also evaluate existing tools based on tool requirements. Finally, we present some practical advices for both designers and users of distributed agile planning tools.
Flexible Coordination in Resource-Constrained Domains
1994-07-01
Experiments (TIEs) with planning technologies developed at both BBN (FMERG) and SRI ( SOCAP ). We have also exported scheduling support capabilities provided by...SRI’s SOCAP course of action (COA) plan generator. "* Development and demonstration of distributed, multi-level deployment scheduling - Through analysis...scheduler was adapted for integration with the SOCAP planning system to provide feedback on transportation feasibility during generation of the
Code of Federal Regulations, 2012 CFR
2012-07-01
... your agency's migration of ETS; (b) Ensure that you have internal policies and procedures in place to..., with agency-wide migration to ETS completed no later than September 30, 2006; (c) Establish a plan that... deployed. This plan must include your migration plan and schedule which must be submitted by March 31, 2004...
Code of Federal Regulations, 2014 CFR
2014-07-01
... your agency's migration of ETS; (b) Ensure that you have internal policies and procedures in place to..., with agency-wide migration to ETS completed no later than September 30, 2006; (c) Establish a plan that... deployed. This plan must include your migration plan and schedule which must be submitted by March 31, 2004...
Code of Federal Regulations, 2013 CFR
2013-07-01
... your agency's migration of ETS; (b) Ensure that you have internal policies and procedures in place to..., with agency-wide migration to ETS completed no later than September 30, 2006; (c) Establish a plan that... deployed. This plan must include your migration plan and schedule which must be submitted by March 31, 2004...
DOT National Transportation Integrated Search
1997-12-01
In the fall of 1997, the ITS Professional Capacity Building Program initiated the development of six White Papers to briefly describe the current status of, and plans for future education and training activities of six organizations engaged in ...
Code of Federal Regulations, 2011 CFR
2011-07-01
... your agency's migration of ETS; (b) Ensure that you have internal policies and procedures in place to..., with agency-wide migration to ETS completed no later than September 30, 2006; (c) Establish a plan that... deployed. This plan must include your migration plan and schedule which must be submitted by March 31, 2004...
Freifeld, Barry; Daley, Tom; Cook, Paul; ...
2014-12-31
Understanding the impacts caused by injection of large volumes of CO 2 in the deep subsurface necessitates a comprehensive monitoring strategy. While surface-based and other remote geophysical methods can provide information on the general morphology of a CO 2 plume, verification of the geochemical conditions and validation of the remote sensing data requires measurements from boreholes that penetrate the storage formation. Unfortunately, the high cost of drilling deep wellbores and deploying instrumentation systems constrains the number of dedicated monitoring borings as well as limits the technologies that can be incorporated in a borehole completion. The objective of the Modular Boreholemore » Monitoring (MBM) Program was to develop a robust suite of well-based tools optimized for subsurface monitoring of CO 2 that could meet the needs of a comprehensive well-based monitoring program. It should have enough flexibility to be easily reconfigured for various reservoir geometries and geologies. The MBM Program sought to provide storage operators with a turn-key fully engineered design that incorporated key technologies, function over the decades long time-span necessary for post-closure reservoir monitoring, and meet industry acceptable risk profiles for deep-well installations. While still within the conceptual design phase of the MBM program, the SECARB Anthropogenic Test in Citronelle, Alabama, USA was identified as a deployment site for our engineered monitoring systems. The initial step in designing the Citronelle MBM system was to down-select from the various monitoring tools available to include technologies that we considered essential to any program. Monitoring methods selected included U-tube geochemical sampling, discrete quartz pressure and temperature gauges, an integrated fibre-optic bundle consisting of distributed temperature and heat-pulse sensing, and a sparse string of conventional 3C-geophones. While not originally planned within the initial MBM work scope, the fibre-optic cable was able to also be used for the emergent technology of distributed acoustic sensing. The MBM monitoring string was installed in March, 2012. To date, the Citronelle MBM instruments continue to operate reliably. Results and lessons learned from the Citronelle MBM deployment are addressed along with examples of data being collected.« less
Looking Forward to the electronic Geophysical Year
NASA Astrophysics Data System (ADS)
Kamide, Y.; Baker, D. N.; Thompson, B.; Barton, C.; Kihn, E.
2004-12-01
During the International Geophysical Year (1957-1958), member countries established many new capabilities pursuing the major IGY objectives of collecting geophysical data as widely as possible and providing free access to these data for all scientists around the globe. A key achievement of the IGY was the establishment of a worldwide system of data centers and physical observatories. The worldwide scientific community has now endorsed and is promoting an electronic Geophysical Year (eGY) initiative. The proposed eGY concept would both commemorate the 50th anniversary of the IGY in 2007-2008 and would provide a forward impetus to geophysics in the 21st century, similar to that provide by the IGY fifty years ago. The eGY concept advocates the establishment of a series of virtual geophysical observatories now being deployed in cyberspace. We discuss plans to aggregate measurements into a readily accessible database along with analysis, visualization, and display tools that will make information available and useful to the scientific community, to the user community, and to the general public. We are examining the possibilities for near-realtime acquisition of data and utilization of forecast tools in order to provide users with advanced space weather capabilities. This program will provide powerful tools for education and public outreach concerning the connected Sun-Earth System.
NASA Technical Reports Server (NTRS)
Darroy, Jean Michel
1993-01-01
Current trends in the spacecraft mission operations area (spacecraft & mission complexity, project duration, required flexibility are requiring a breakthrough for what concerns philosophy, organization, and support tools. A major evolution is related to space operations 'informationalization', i.e adding to existing operations support & data processing systems a new generation of tools based on advanced information technologies (object-oriented programming, artificial intelligence, data bases, hypertext) that automate, at least partially, operations tasks that used be performed manually (mission & project planning/scheduling, operations procedures elaboration & execution, data analysis & failure diagnosis). All the major facets of this 'informationalization' are addressed at MATRA MARCONI SPACE, operational applications were fielded and generic products are becoming available. These various applications have generated a significant feedback from the users (at ESA, CNES, ARIANESPACE, MATRA MARCONI SPACE), which is now allowing us to precisely measure how the deployment of this new generation of tools, that we called OPSWARE, can 'reengineer' current spacecraft mission operations philosophy, how it can make space operations faster, better, and cheaper. This paper can be considered as an update of the keynote address 'Knowledge-Based Systems for Spacecraft Control' presented during the first 'Ground Data Systems for Spacecraft Control' conference in Darmstadt, June 1990, with a special emphasis on these last two years users feedback.
Goodman, Petra; Turner, Annette; Agazio, Janice; Throop, Meryia; Padden, Diane; Greiner, Shawna; Hillier, Shannon L
2013-07-01
Military mothers and their children cope with unique issues when mothers are deployed. In this article, we present mothers' perspectives on how military resources affected them, their children, and their caregivers during deployment. Mothers described beneficial features of military programs such as family readiness groups and behavioral health care, processes such as unit support, and policies on length and timing of deployments. Aspects that were not supportive included inflexibility in family care plans, using personal leave time and funds for transporting children, denial of release to resolve caretaker issues, and limited time for reintegration. We offer recommendations for enhanced support to these families that the military could provide. Reprint & Copyright © 2013 Association of Military Surgeons of the U.S.
A Coordinated USGS Science Response to Hurricane Sandy
NASA Astrophysics Data System (ADS)
Jones, S.; Buxton, H. T.; Andersen, M.; Dean, T.; Focazio, M. J.; Haines, J.; Hainly, R. A.
2013-12-01
In late October 2012, Hurricane Sandy came ashore during a spring high tide on the New Jersey coastline, delivering hurricane-force winds, storm tides exceeding 19 feet, driving rain, and plummeting temperatures. Hurricane Sandy resulted in 72 direct fatalities in the mid-Atlantic and northeastern United States, and widespread and substantial physical, environmental, ecological, social, and economic impacts estimated at near $50 billion. Before the landfall of Hurricane Sandy, the USGS provided forecasts of potential coastal change; collected oblique aerial photography of pre-storm coastal morphology; deployed storm-surge sensors, rapid-deployment streamgages, wave sensors, and barometric pressure sensors; conducted Light Detection and Ranging (lidar) aerial topographic surveys of coastal areas; and issued a landslide alert for landslide prone areas. During the storm, Tidal Telemetry Networks provided real-time water-level information along the coast. Long-term networks and rapid-deployment real-time streamgages and water-quality monitors tracked river levels and changes in water quality. Immediately after the storm, the USGS serviced real-time instrumentation, retrieved data from over 140 storm-surge sensors, and collected other essential environmental data, including more than 830 high-water marks mapping the extent and elevation of the storm surge. Post-storm lidar surveys documented storm impacts to coastal barriers informing response and recovery and providing a new baseline to assess vulnerability of the reconfigured coast. The USGS Hazard Data Distribution System served storm-related information from many agencies on the Internet on a daily basis. Immediately following Hurricane Sandy the USGS developed a science plan, 'Meeting the Science Needs of the Nation in the Wake of Hurricane Sandy-A U.S. Geological Survey Science Plan for Support of Restoration and Recovery'. The plan will ensure continuing coordination of internal USGS activities as well as enhancing our work with other agencies. The data, information, and tools that are being produced by implementing this plan will: (1) further characterize impacts and changes, (2) guide mitigation and restoration of impacted communities and ecosystems, (3) inform a redevelopment strategy aimed at developing resilient coastal communities and ecosystems, (4) improve preparedness and responsiveness to the next hurricane or similar coastal disaster, and (5) enable improved hazard assessment, response, and recovery for future storms along the hurricane prone shoreline of the United States. The activities outlined in the plan are organized in five themes based on impact types and information needs. These USGS science themes are: Theme 1: Coastal topography and bathymetry. Theme 2: Impacts to coastal beaches and barriers. Theme 3: Impacts of storm surge and estuarine and bay hydrology. Theme 4: Impacts on environmental quality and persisting contaminant exposures. Theme 5: Impacts to coastal ecosystems, habitats, and fish and wildlife. The major emphases in the implementation of this plan are interacting with stakeholders to better understand their specific data and information needs, engaging with other Federal agencies and non-governmental agencies to encourage collaboration and avoid duplication, defining the best way to make information available, and providing applications of USGS science and expertise to support decision-making.
GLUE 2 deployment: Ensuring quality in the EGI/WLCG information system
NASA Astrophysics Data System (ADS)
Burke, Stephen; Alandes Pradillo, Maria; Field, Laurence; Keeble, Oliver
2014-06-01
The GLUE 2 information model is now fully supported in the production EGI/WLCG information system. However, to make it usable and allow clients to rely on the published information it is important that the meaning is clearly defined, and that information providers and site configurations are validated to ensure as far as possible that what they publish is correct. In this paper we describe the definition of a detailed schema usage profile, the implementation of a software tool to validate published information according to the profile and the use of the tool in the production Grid, and also summarise the overall state of GLUE 2 deployment.
Development of a ROV Deployed Video Analysis Tool for Rapid Measurement of Submerged Oil/Gas Leaks
DOE Office of Scientific and Technical Information (OSTI.GOV)
Savas, Omer
Expanded deep sea drilling around the globe makes it necessary to have readily available tools to quickly and accurately measure discharge rates from accidental submerged oil/gas leak jets for the first responders to deploy adequate resources for containment. We have developed and tested a field deployable video analysis software package which is able to provide in the field sufficiently accurate flow rate estimates for initial responders in accidental oil discharges in submarine operations. The essence of our approach is based on tracking coherent features at the interface in the near field of immiscible turbulent jets. The software package, UCB_Plume, ismore » ready to be used by the first responders for field implementation. We have tested the tool on submerged water and oil jets which are made visible using fluorescent dyes. We have been able to estimate the discharge rate within 20% accuracy. A high end WINDOWS laptop computer is suggested as the operating platform and a USB connected high speed, high resolution monochrome camera as the imaging device are sufficient for acquiring flow images under continuous unidirectional illumination and running the software in the field. Results are obtained over a matter of minutes.« less
Ten Years of Analyzing the Duck Chart: How an NREL Discovery in 2008 Is
examined how to plan for future large-scale integration of solar photovoltaic (PV) generation on the result, PV was deployed more widely, and system operators became increasingly concerned about how solar emerging energy and environmental policy initiatives pushing for higher levels of solar PV deployment. As a
China Moves Out: Stepping Stones Toward a New Maritime Strategy
2015-04-01
that participated in the exercise deployed to Pakistan without replenishing food stores, although they did take on fuel.59 Press reporting on the...carried out more than 10 combat-realistic training tasks, including the anti-pirate, joint search and rescue, anti- nuclear and anti-chemical contamination ... Malaysia ) Taiwan Senkaku (Japan) Scarborough (Philippines) James Shoal ( Malaysia ) Table 4. Evolution of PLAN Western Pacific Deployments 36 China
2012-07-01
from the Scow (a self -propelled barge) and rigged to be suspended in the water at various depths up to 500’. The sensor was deployed upside down...Figure 26). This allowed the e-source barge to change orientation as required in the test run plan. This was a “ soft ” moor so weather conditions were...deployed from the Scow (a self -propelled barge) and rigged to be suspended in the water at various depths up to 500’. Deployment of the sensor was in
NASA Technical Reports Server (NTRS)
Lee, Paul U.; Bender, Kim; Pagan, Danielle
2011-01-01
Flexible Airspace Management (FAM) is a mid- term Next Generation Air Transportation System (NextGen) concept that allows dynamic changes to airspace configurations to meet the changes in the traffic demand. A series of human-in-the-loop (HITL) studies have identified procedures and decision support requirements needed to implement FAM. This paper outlines a suggested FAM procedure and associated decision support functionality based on these HITL studies. A description of both the tools used to support the HITLs and the planned NextGen technologies available in the mid-term are presented and compared. The mid-term implementation of several NextGen capabilities, specifically, upgrades to the Traffic Management Unit (TMU), the initial release of an en route automation system, the deployment of a digital data communication system, a more flexible voice communications network, and the introduction of a tool envisioned to manage and coordinate networked ground systems can support the implementation of the FAM concept. Because of the variability in the overall deployment schedule of the mid-term NextGen capabilities, the dependency of the individual NextGen capabilities are examined to determine their impact on a mid-term implementation of FAM. A cursory review of the different technologies suggests that new functionality slated for the new en route automation system is a critical enabling technology for FAM, as well as the functionality to manage and coordinate networked ground systems. Upgrades to the TMU are less critical but important nonetheless for FAM to be fully realized. Flexible voice communications network and digital data communication system could allow more flexible FAM operations but they are not as essential.
Lessons Learnt from and Sustainability of Adopting a Personal Learning Environment & Network (Ple&N)
ERIC Educational Resources Information Center
Tsui, Eric; Sabetzadeh, Farzad
2014-01-01
This paper describes the feedback from the configuration and deployment of a Personal Learning Environment & Network (PLE&N) tool to support peer-based social learning for university students and graduates. An extension of an earlier project in which a generic and PLE&N was deployed for all learners, the current PLE&N is a…
Operation United Assistance: infectious disease threats to deployed military personnel.
Murray, Clinton K; Yun, Heather C; Markelz, Ana Elizabeth; Okulicz, Jason F; Vento, Todd J; Burgess, Timothy H; Cardile, Anthony P; Miller, R Scott
2015-06-01
As part of the international response to control the recent Ebola outbreak in West Africa, the Department of Defense has deployed military personnel to train Liberians to manage the disease and build treatment units and a hospital for health care volunteers. These steps have assisted in providing a robust medical system and augment Ebola diagnostic capability within the affected nations. In order to prepare for the deployment of U.S. military personnel, the infectious disease risks of the regions must be determined. This evaluation allows for the establishment of appropriate force health protection posture for personnel while deployed, as well as management plans for illnesses presenting after redeployment. Our objective was to detail the epidemiology and infectious disease risks for military personnel in West Africa, particularly for Liberia, along with lessons learned from prior deployments. Reprint & Copyright © 2015 Association of Military Surgeons of the U.S.
DOE Office of Scientific and Technical Information (OSTI.GOV)
David Fritz, John Floren
2013-08-27
Minimega is a simple emulytics platform for creating testbeds of networked devices. The platform consists of easily deployable tools to facilitate bringing up large networks of virtual machines including Windows, Linux, and Android. Minimega attempts to allow experiments to be brought up quickly with nearly no configuration. Minimega also includes tools for simple cluster management, as well as tools for creating Linux based virtual machine images.
Psychometric Analysis of the Servicemember Evaluation Tool
to assess psychological resilience. The Naval Center for Combat and Operational Stress Control developed the Servicemember Evaluation Tool (SET) to...vessels on deployment. The goals of this thesis are to evaluate the psychometric properties of the SET on this sample population. Furthermore, this
Remote monitoring as a tool in condition assessment of a highway bridge
NASA Astrophysics Data System (ADS)
Tantele, Elia A.; Votsis, Renos A.; Onoufriou, Toula; Milis, Marios; Kareklas, George
2016-08-01
The deterioration of civil infrastructure and their subsequent maintenance is a significant problem for the responsible managing authorities. The ideal scenario is to detect deterioration and/or structural problems at early stages so that the maintenance cost is kept low and the safety of the infrastructure remains undisputed. The current inspection regimes implemented mostly via visual inspection are planned at specific intervals but are not always executed on time due to shortcomings in expert personnel and finance. However the introduction of technological advances in the assessment of infrastructures provides the tools to alleviate this problem. This study describes the assessment of a highway RC bridge's structural condition using remote structural health monitoring. A monitoring plan is implemented focusing on strain measurements; as strain is a parameter influenced by the environmental conditions supplementary data are provided from temperature and wind sensors. The data are acquired using wired sensors (deployed at specific locations) which are connected to a wireless sensor unit installed at the bridge. This WSN application enables the transmission of the raw data from the field to the office for processing and evaluation. The processed data are then used to assess the condition of the bridge. This case study, which is part of an undergoing RPF research project, illustrates that remote monitoring can alleviate the problem of missing structural inspections. Additionally, shows its potential to be the main part of a fully automated smart procedure of obtaining structural data, processed them and trigger an alarm when certain undesirable conditions are met.
Decision-making tool for applying adaptive traffic control systems : final report.
DOT National Transportation Integrated Search
2016-03-01
Adaptive traffic signal control technologies have been increasingly deployed in real world situations. The objective of this project was to develop a decision-making tool to guide traffic engineers and decision-makers who must decide whether or not a...
DOT National Transportation Integrated Search
2017-01-01
FHWAs Road Weather Management Program developed a Prototype Road Weather Management (RW-PM) Tool to help DOTs maximize the effectiveness of their maintenance resources and efficiently adjust deployments dynamically, as road conditions and traffic ...
AIRSAR South American deployment: Operation plan, version 3.0
NASA Technical Reports Server (NTRS)
Kobrick, M.
1993-01-01
The United States National Aeronautics and Space Administration (NASA) and the Brazilian Commission for Space Activities (COBAE) are undertaking a joint experiment involving NASA's DC-8 research aircraft and the Airborne Synthetic Aperture Radar (AIRSAR) system during late May and June 1993. The research areas motivating these activities are: (1) fundamental research in the role of soils, vegetation, and hydrology in the global carbon cycle; and (2) in cooperation with South American scientists, airborne remote sensing research for the upcoming NASA Spaceborne Imaging Radar (SIR)-C/X-SAR flights on the Space Shuttle. A flight schedule and plans for the deployment that were developed are included. Maps of the site locations and schematic indications of flight routes and dates, plots showing swath locations derived from the flight requests and generated by flight planning software, and, most importantly, a calendar showing which sites will be imaged each day are included.
The production deployment of IPv6 on WLCG
NASA Astrophysics Data System (ADS)
Bernier, J.; Campana, S.; Chadwick, K.; Chudoba, J.; Dewhurst, A.; Eliáš, M.; Fayer, S.; Finnern, T.; Grigoras, C.; Hartmann, T.; Hoeft, B.; Idiculla, T.; Kelsey, D. P.; López Muñoz, F.; Macmahon, E.; Martelli, E.; Millar, A. P.; Nandakumar, R.; Ohrenberg, K.; Prelz, F.; Rand, D.; Sciabà, A.; Tigerstedt, U.; Voicu, R.; Walker, C. J.; Wildish, T.
2015-12-01
The world is rapidly running out of IPv4 addresses; the number of IPv6 end systems connected to the internet is increasing; WLCG and the LHC experiments may soon have access to worker nodes and/or virtual machines (VMs) possessing only an IPv6 routable address. The HEPiX IPv6 Working Group has been investigating, testing and planning for dual-stack services on WLCG for several years. Following feedback from our working group, many of the storage technologies in use on WLCG have recently been made IPv6-capable. This paper presents the IPv6 requirements, tests and plans of the LHC experiments together with the tests performed on the group's IPv6 test-bed. This is primarily aimed at IPv6-only worker nodes or VMs accessing several different implementations of a global dual-stack federated storage service. Finally the plans for deployment of production dual-stack WLCG services are presented.
Decision Analysis Tools for Volcano Observatories
NASA Astrophysics Data System (ADS)
Hincks, T. H.; Aspinall, W.; Woo, G.
2005-12-01
Staff at volcano observatories are predominantly engaged in scientific activities related to volcano monitoring and instrumentation, data acquisition and analysis. Accordingly, the academic education and professional training of observatory staff tend to focus on these scientific functions. From time to time, however, staff may be called upon to provide decision support to government officials responsible for civil protection. Recognizing that Earth scientists may have limited technical familiarity with formal decision analysis methods, specialist software tools that assist decision support in a crisis should be welcome. A review is given of two software tools that have been under development recently. The first is for probabilistic risk assessment of human and economic loss from volcanic eruptions, and is of practical use in short and medium-term risk-informed planning of exclusion zones, post-disaster response, etc. A multiple branch event-tree architecture for the software, together with a formalism for ascribing probabilities to branches, have been developed within the context of the European Community EXPLORIS project. The second software tool utilizes the principles of the Bayesian Belief Network (BBN) for evidence-based assessment of volcanic state and probabilistic threat evaluation. This is of practical application in short-term volcano hazard forecasting and real-time crisis management, including the difficult challenge of deciding when an eruption is over. An open-source BBN library is the software foundation for this tool, which is capable of combining synoptically different strands of observational data from diverse monitoring sources. A conceptual vision is presented of the practical deployment of these decision analysis tools in a future volcano observatory environment. Summary retrospective analyses are given of previous volcanic crises to illustrate the hazard and risk insights gained from use of these tools.
Research on OpenStack of open source cloud computing in colleges and universities’ computer room
NASA Astrophysics Data System (ADS)
Wang, Lei; Zhang, Dandan
2017-06-01
In recent years, the cloud computing technology has a rapid development, especially open source cloud computing. Open source cloud computing has attracted a large number of user groups by the advantages of open source and low cost, have now become a large-scale promotion and application. In this paper, firstly we briefly introduced the main functions and architecture of the open source cloud computing OpenStack tools, and then discussed deeply the core problems of computer labs in colleges and universities. Combining with this research, it is not that the specific application and deployment of university computer rooms with OpenStack tool. The experimental results show that the application of OpenStack tool can efficiently and conveniently deploy cloud of university computer room, and its performance is stable and the functional value is good.
Machine learning for micro-tomography
NASA Astrophysics Data System (ADS)
Parkinson, Dilworth Y.; Pelt, Daniël. M.; Perciano, Talita; Ushizima, Daniela; Krishnan, Harinarayan; Barnard, Harold S.; MacDowell, Alastair A.; Sethian, James
2017-09-01
Machine learning has revolutionized a number of fields, but many micro-tomography users have never used it for their work. The micro-tomography beamline at the Advanced Light Source (ALS), in collaboration with the Center for Applied Mathematics for Energy Research Applications (CAMERA) at Lawrence Berkeley National Laboratory, has now deployed a series of tools to automate data processing for ALS users using machine learning. This includes new reconstruction algorithms, feature extraction tools, and image classification and recommen- dation systems for scientific image. Some of these tools are either in automated pipelines that operate on data as it is collected or as stand-alone software. Others are deployed on computing resources at Berkeley Lab-from workstations to supercomputers-and made accessible to users through either scripting or easy-to-use graphical interfaces. This paper presents a progress report on this work.
Smart Grid Demonstration Project
DOE Office of Scientific and Technical Information (OSTI.GOV)
Miller, Craig; Carroll, Paul; Bell, Abigail
The National Rural Electric Cooperative Association (NRECA) organized the NRECA-U.S. Department of Energy (DOE) Smart Grid Demonstration Project (DE-OE0000222) to install and study a broad range of advanced smart grid technologies in a demonstration that spanned 23 electric cooperatives in 12 states. More than 205,444 pieces of electronic equipment and more than 100,000 minor items (bracket, labels, mounting hardware, fiber optic cable, etc.) were installed to upgrade and enhance the efficiency, reliability, and resiliency of the power networks at the participating co-ops. The objective of this project was to build a path for other electric utilities, and particularly electrical cooperatives,more » to adopt emerging smart grid technology when it can improve utility operations, thus advancing the co-ops’ familiarity and comfort with such technology. Specifically, the project executed multiple subprojects employing a range of emerging smart grid technologies to test their cost-effectiveness and, where the technology demonstrated value, provided case studies that will enable other electric utilities—particularly electric cooperatives— to use these technologies. NRECA structured the project according to the following three areas: Demonstration of smart grid technology; Advancement of standards to enable the interoperability of components; and Improvement of grid cyber security. We termed these three areas Technology Deployment Study, Interoperability, and Cyber Security. Although the deployment of technology and studying the demonstration projects at coops accounted for the largest portion of the project budget by far, we see our accomplishments in each of the areas as critical to advancing the smart grid. All project deliverables have been published. Technology Deployment Study: The deliverable was a set of 11 single-topic technical reports in areas related to the listed technologies. Each of these reports has already been submitted to DOE, distributed to co-ops, and posted for universal access at www.nreca.coop/smartgrid. This research is available for widespread distribution to both cooperative members and non-members. These reports are listed in Table 1.2. Interoperability: The deliverable in this area was the advancement of the MultiSpeak™ interoperability standard from version 4.0 to version 5.0, and improvement in the MultiSpeak™ documentation to include more than 100 use cases. This deliverable substantially expanded the scope and usability of MultiSpeak, ™ the most widely deployed utility interoperability standard, now in use by more than 900 utilities. MultiSpeak™ documentation can be accessed only at www.multispeak.org. Cyber Security: NRECA’s starting point was to develop cyber security tools that incorporated succinct guidance on best practices. The deliverables were: cyber security extensions to MultiSpeak,™ which allow more security message exchanges; a Guide to Developing a Cyber Security and Risk Mitigation Plan; a Cyber Security Risk Mitigation Checklist; a Cyber Security Plan Template that co-ops can use to create their own cyber security plans; and Security Questions for Smart Grid Vendors.« less
Piazza, Michele; Lupia, Mario; Grego, Franco; Antonello, Michele
2015-04-01
The technique is demonstrated in a 78-year-old man; the preoperative CT angiogram showed a descending thoracic aorta ulcer of 5.9 cm in maximum diameter and 3.8 cm longitudinal extension. A ZTEG-2P-36-127-PF (Cook Medical) single tubular endograft was planned to be deployed. From the preoperative CT angiogram we planned to land 4.7 cm above the midline of the descending thoracic aorta ulcer and 8.0 cm below. In the operating room, under radioscopic vision the centre of the transesophageal echography probe was used as marker to identify the correspondent midline of the descending thoracic aorta ulcer and a centimeter-sized pigtail catheter in the aorta was used to calculate the desired length above and below the ulcer midline. The endograft was introduced and placed in the desired position compared to the transesophageal echography probe and the catheter; under transesophageal echography vision the graft was finally deployed. The CT angiogram at 1 month showed the correct endograft position, descending thoracic aorta ulcer exclusion with no signs of endoleak. In selected cases, this method allows planning in advance safe stent graft positioning and deployment totally assisted by transesophageal echography, with no risk of periprocedural contrast-related renal failure and reduced radiation exposure for the patient and operators. © The Author(s) 2014 Reprints and permissions: sagepub.co.uk/journalsPermissions.nav.
DOT National Transportation Integrated Search
1998-11-01
The purpose of this study is to provide the framework for future implementation of Intelligent Transportation Systems (ITS) in the Lower Hudson Valley area. The focus of the planning study is the regional freeway system, major arterial routes and the...
Retirement Plan Lawsuits: Preparing for the Storm
ERIC Educational Resources Information Center
Morahan, John; Turner, Aaron
2017-01-01
Currently, higher education is being roiled by class-action lawsuits filed against high-profile institutions, including MIT, Yale and New York University, over management of their retirement plans. As the lawyers are deployed and the billable hours accrue, it is timely to examine how those who have responsibility for retirement plan…
Continuing Development of California State Packet Radio Project.
ERIC Educational Resources Information Center
Brownrigg, Edwin
1992-01-01
Provides background on the California State Library Packet Radio project, which will use packet radios to deploy a wireless, high-speed, wide-area network of 600 nodes, including 100 libraries, in the San Francisco Bay Area. Project goals and objectives, plan of operation, equipment, and evaluation plans are summarized. (MES)
Planning Flight Paths of Autonomous Aerobots
NASA Technical Reports Server (NTRS)
Kulczycki, Eric; Elfes, Alberto; Sharma, Shivanjli
2009-01-01
Algorithms for planning flight paths of autonomous aerobots (robotic blimps) to be deployed in scientific exploration of remote planets are undergoing development. These algorithms are also adaptable to terrestrial applications involving robotic submarines as well as aerobots and other autonomous aircraft used to acquire scientific data or to perform surveying or monitoring functions.
75 FR 42727 - Implementing the National Broadband Plan; Comment Period Extension
Federal Register 2010, 2011, 2012, 2013, 2014
2010-07-22
..., state, and private entities seek to develop Smart Grid technologies. The second RFI requested information on the evolving needs of electric utilities as Smart Grid technologies are more broadly deployed... accept reply comments, data, and information regarding the National Broadband Plan RFI: Data Access and...
Transportation Challenges in the Hampton Roads, VA, Region
2012-06-01
ORDERS ( PPO ) ...........................................................11 J. HIGHWAYS FOR NATIONAL DEFENSE (HND) ...................................12 K... PPO Port Planning Orders RND Railroads for National Defense SDDCTEA Surface Deployment and Distribution Command Transportation Engineering...important Continental United States (CONUS) port infrastructure in both peacetime and wartime. Strategic Seaports and Port Planning Orders ( PPOs ) were
Davis, Laurel; Hanson, Sheila K.; Zamir, Osnat; Gewirtz, Abigail H.; DeGarmo, David S.
2015-01-01
Deployment separation and reunifications are salient contexts that directly impact effective family functioning and parenting for military fathers. Yet, we know very little about determinants of post-deployed father involvement and effective parenting. The present study examined hypothesized risk and protective factors of observed parenting for 282 post-deployed fathers who served in the Army National Guard/Reserves. Pre-intervention data were employed from fathers participating in the After Deployment, Adaptive Parenting Tools (ADAPT) randomized control trial. Parenting practices were obtained from direct observation of father-child interaction and included measures of problem solving, harsh discipline, positive involvement, encouragement, and monitoring. Risk factors included combat exposure, negative life events, months deployed, and PTSD symptoms. Protective factors included education, income, dyadic adjustment, and social support. Results of a structural equation model predicting an effective parenting construct indicated that months deployed, income, and father age were most related to observed parenting, explaining 16% of the variance. We are aware of no other study utilizing direct parent-child observations of father’s parenting skills following overseas deployment. Implications for practice and preventive intervention are discussed. PMID:26213794
DOE Office of Scientific and Technical Information (OSTI.GOV)
Herman, R.J.
1997-07-01
This narrative addresses the development of the subsea flexible pipe catenary handling tools and procedures as used in the Gulf of Mexico on the Enserch Garden Banks 388 Freestanding Production Riser. The philosophy that was invoked for the development of the tools and procedures was targeted on long term utilization and field maintenance capability with minimum vessel relocation requirements and minimum production interruptions. The initial emphasis for the required tools and procedures was to develop worker safe, environmentally friendly and cost effective equipment. These tools are for the deployment and installation of 3-inch Production and Annulus flexible pipe catenaries frommore » the Enserch Garden Banks 388 Floating Production Vessel to the system`s Freestanding Production Riser. The Pull In Jib system is common to the handling of all the catenaries. The Pull In Jib system has been designed to support the greater loads of the 8-inch and 12-inch export line catenaries.« less
The Diesel Combustion Collaboratory: Combustion Researchers Collaborating over the Internet
DOE Office of Scientific and Technical Information (OSTI.GOV)
C. M. Pancerella; L. A. Rahn; C. Yang
2000-02-01
The Diesel Combustion Collaborator (DCC) is a pilot project to develop and deploy collaborative technologies to combustion researchers distributed throughout the DOE national laboratories, academia, and industry. The result is a problem-solving environment for combustion research. Researchers collaborate over the Internet using DCC tools, which include: a distributed execution management system for running combustion models on widely distributed computers, including supercomputers; web-accessible data archiving capabilities for sharing graphical experimental or modeling data; electronic notebooks and shared workspaces for facilitating collaboration; visualization of combustion data; and video-conferencing and data-conferencing among researchers at remote sites. Security is a key aspect of themore » collaborative tools. In many cases, the authors have integrated these tools to allow data, including large combustion data sets, to flow seamlessly, for example, from modeling tools to data archives. In this paper the authors describe the work of a larger collaborative effort to design, implement and deploy the DCC.« less
Defense: FY2011 Authorization and Appropriations
2010-11-23
the Czech Republic a modified version of the land-based BMD system currently deployed in Alaska and California. The Obama Administration dropped that...Implications for National Security Planning, by Stephen Daggett. The four QDRs produced in 1997, 2001, 2005, and 2010 document an ongoing evolution of DOD...expensive part of measures to protect forward deployed forces. FY2011 Base Budget Highlights and Potential Issues The FY2011 base budget request
NASA Astrophysics Data System (ADS)
Konadu, D. D.; Sobral Mourao, Z.; Lupton, R.; Skelton, S.
2015-12-01
The UK Department of Energy and Climate Change has developed four low-carbon energy transition pathways - the Carbon Plan - towards achieving the legally binding 80% territorial greenhouse gas emissions reduction, stipulated in the 2008 Climate Change Act by 2050. All the pathways require increase in bioenergy deployment, of which a significant amount could be indigenously sourced from crops. But will increased domestic production of energy crops conflict with other land use and ecosystem priorities? To address this question, a coupled analysis of the four energy transition pathways and land use has been developed using an integrated resource accounting platform called ForeseerTM. The two systems are connected by the bioenergy component, and are projected forward in time to 2050, under different scenarios of energy crop composition and yield, and accounting for various constraints on land use for agriculture and ecosystem services. The results show between 7 and 61% of UK agricultural land could be required to meet bioenergy deployment projections under different combinations of crop yield and compositions for the transition pathways. This could result in competition for land for food production and other socio-economic and ecological land uses. Consequently, the potential role of bioenergy in achieving UK emissions reduction targets may face significant deployment challenges.
Methods for Analyzing the Economic Value of Concentrating Solar Power with Thermal Energy Storage
DOE Office of Scientific and Technical Information (OSTI.GOV)
Denholm, Paul; Jorgenson, Jennie; Miller, Mackay
2015-07-20
Concentrating solar power with thermal energy storage (CSP-TES) provides multiple quantifiable benefits compared to CSP without storage or to solar photovoltaic (PV) technology, including higher energy value, ancillary services value, and capacity value. This report describes modeling approaches to quantifying these benefits that have emerged through state-level policymaking in the United States as well as the potential applicability of these methods in China. The technical potential for CSP-TES in China is significant, but deployment has not yet achieved the targets established by the Chinese government. According to the 12th Five Year Plan for Renewable Energy (2011-2015), CSP was expected tomore » reach 1 GW by 2015 and 3 GW by 2020 in China, yet as of December 2014, deployment totaled only 13.8 MW. One barrier to more rapid deployment is the lack of an incentive specific to CSP, such as a feed-in tariff. The 13th Five Year Plan for Solar Generation (2016-2020), which is under development, presents an opportunity to establish a feed-in tariff specific to CSP. This report, produced under the auspices of the U.S.-China Renewable Energy Partnership, aims to support the development of Chinese incentives that advance CSP deployment goals.« less
Development and modeling of self-deployable structures
NASA Astrophysics Data System (ADS)
Neogi, Depankar
Deployable space structures are prefabricated structures which can be transformed from a closed, compact configuration to a predetermined expanded form in which they are stable and can bear loads. The present research effort investigates a new family of deployable structures, called the Self-Deployable Structures (SDS). Unlike other deployable structures, which have rigid members, the SDS members are flexible while the connecting joints are rigid. The joints store the predefined geometry of the deployed structure in the collapsed state. The SDS is stress-free in both deployed and collapsed configurations and results in a self-standing structure which acquires its structural properties after a chemical reaction. Reliability of deployment is one of the most important features of the SDS, since it does not rely on mechanisms that can lock during deployment. The unit building block of these structures is the self-deployable structural element (SDSE). Several SDSE members can be linked to generate a complex building block such as a triangular or a tetrahedral structure. Different SDSE and SDS concepts are investigated in the research work, and the performance of SDS's are experimentally and theoretically explored. Triangular and tetrahedral prototype SDS have been developed and presented. Theoretical efforts include modeling the behavior of 2-dimensional SDSs. Using this design tool, engineers can study the effects of different packing configurations and deployment sequence; and perform optimization on the collapsed state of a structure with different external constraints. The model also predicts if any lockup or entanglement occurs during deployment.
Experiences and career intentions of combat-deployed UK military personnel.
Morris-Butler, R; Jones, N; Greenberg, N; Campion, B; Wessely, S
2018-05-17
Most studies of the psychological impact of military deployment focus on the negative and traumatic aspects. Less is known about the full range of deployment experiences nor how these may impact on career intentions. To examine subjective operational experiences and career intentions in deployed UK military personnel using data gathered toward the end of an operational deployment. Data were gathered during deployment in Iraq and Afghanistan. A self-report survey collected data on sociodemographic, operational and military factors. Respondents provided their strength of agreement or disagreement with six potentially positive deployment experiences and their endorsement or rejection of six possible career intentions. Two mental health measures assessed symptoms of common mental disorder and post-traumatic stress disorder. Responses were 681 in Iran 2009 (100% response rate); 1421 in Afghanistan in 2010 (100%), 1362 in 2011 (96%) and 860 in 2015 (91%). Five of the potentially positive outcomes were endorsed by >50% of the sample: confidence about remaining healthy after returning home, pride in accomplishments, increased confidence in abilities, improved unit cohesion and experiencing a positive life effect. Ninety per cent of respondents planned to continue in service after returning home. Fewer positive deployment experiences, poorer mental health, lesser unit cohesion and more negative impressions of leadership were significantly associated with intention to leave service. Contrary to the popular belief that UK military personnel deployed to Iraq or Afghanistan experience negative outcomes, this paper shows that deployment can be a positive experience for a substantial majority of deployed personnel.
Integrated Model to Assess Cloud Deployment Effectiveness When Developing an IT-strategy
NASA Astrophysics Data System (ADS)
Razumnikov, S.; Prankevich, D.
2016-04-01
Developing an IT-strategy of cloud deployment is a complex issue since even the stage of its formation necessitates revealing what applications will be the best possible to meet the requirements of a company business-strategy, evaluate reliability and safety of cloud providers and analyze staff satisfaction. A system of criteria, as well an integrated model to assess cloud deployment effectiveness is offered. The model makes it possible to identify what applications being at the disposal of a company, as well as new tools to be deployed are reliable and safe enough for implementation in the cloud environment. The data on practical use of the procedure to assess cloud deployment effectiveness by a provider of telecommunication services is presented. The model was used to calculate values of integral indexes of services to be assessed, then, ones, meeting the criteria and answering the business-strategy of a company, were selected.
Evaluation of a Digital Library by Means of Quality Function Deployment (QFD) and the Kano Model
ERIC Educational Resources Information Center
Garibay, Cecilia; Gutierrez, Humberto; Figueroa, Arturo
2010-01-01
This paper proposes utilizing a combination of the Quality Function Deployment (QFD)-Kano model as a useful tool to evaluate service quality. The digital library of the University of Guadalajara (Mexico) is presented as a case study. Data to feed the QFD-Kano model was gathered by an online questionnaire that was made available to users on the…
2003-01-01
dysp = Dyspnea euph = euphoria excitement = excited fib = fibrosis flush face = flush face ftg = fatigue Head = Headache Gidd = giddiness inco...nausea Neck = neck ache nose = irritated nose Pallor Pulm edema= pulmonar y edema Resp sys = Respiratory System skin = irritated skin som = somnolence
2014-01-01
testing following Stage 5 C. Symptoms • Confusion (24 hrs) • Irritability • Unsteady on feet • Vertigo /dizziness • Headaches • Photophobia • Phonophobia...stationary bike, treadmill and/or hand crank • Maintain this level of exertion for approximately two minutes • Assess for symptoms (headache, vertigo
2007-04-23
The United States faces serious public health threats from the deliberate use of weapons of mass destruction (WMD)--chemical, biological, radiological, or nuclear (CBRN)--by hostile States or terrorists, and from naturally emerging infectious diseases that have a potential to cause illness on a scale that could adversely impact national security. Effective strategies to prevent, mitigate, and treat the consequences of CBRN threats is an integral component of our national security strategy. To that end, the United States must be able to rapidly develop, stockpile, and deploy effective medical countermeasures to protect the American people. The HHS Public Health Emergency Medical Countermeasures Enterprise (PHEMCE) has taken a holistic, end-to-end approach that considers multiple aspects of the medical countermeasures mission including research, development, acquisition, storage, maintenance, deployment, and guidance for utilization. Phase one of this approach established the HHS PHEMCE Strategy for Chemical, Biological, Radiological, and Nuclear Threats (HHS PHEMCE Strategy). The HHS PHEMCE Strategy, published in the Federal Register on March 20, 2007, described a framework of strategic policy goals and objectives for identifying medical countermeasure requirements and establishing priorities for medical countermeasure evaluation, development and acquisition. These strategic policy goals and objectives were used to establish the Four Pillars upon which this HHS Public Health Emergency Medical Countermeasures Enterprise Implementation Plan (HHS PHEMCE Implementation Plan) is based. The HHS PHEMCE Implementation Plan considers the full spectrum of medical countermeasures-related activities, including research, development, acquisition, storage/maintenance, deployment, and utilization. The HHS PHEMCE Implementation Plan is consistent with the President's Biodefense for the 21st Century and is aligned with the National Strategy for Medical Countermeasures against Weapons of Mass Destruction.
Survey of Network Visualization Tools
2007-12-01
Dimensionality • 2D Comments: Deployment Type: • Components for tool building • Standalone Tool OS: • Windows Extensibility • ActiveX ...Visual Basic Comments: Interoperability Daisy is fully compliant with Microsoft’s ActiveX , therefore, other Windows based programs can...other functions that improve analytic decision making. Available in ActiveX , C++, Java, and .NET editions. • Tom Sawyer Visualization: Enables you to
Deployer Performance Results for the TSS-1 Mission
NASA Technical Reports Server (NTRS)
Marshall, Leland S.; Geiger, Ronald V.
1995-01-01
Performance of the Tethered Satellite System (TSS) Deployer during the STS-46 mission (July and August 1992) is analyzed in terms of hardware operation at the component and system level. Although only a limited deployment of the satellite was achieved (256 meters vs 20 kilometers planned), the mission served to verify the basic capability of the Deployer to release, control and retrieve a tethered satellite. - Deployer operational flexibility that was demonstrated during the flight is also addressed. Martin Marietta was the prime contractor for the development of the Deployer, under management of the NASA George C. Marshall Space Flight Center (MSFC). The satellite was provided by Alenia, Torino, Italy under contract to the Agencia Spaziale Italiana (ASI). Proper operation of the avionics components and the majority of mechanisms was observed during the flight. System operations driven by control laws for the deployment and retrieval of the satellite were also successful for the limited deployment distance. Anomalies included separation problems for one of the two umbilical connectors between the Deployer and satellite, tether jamming (at initial Satellite fly-away and at a deployment distance of 224 meters), and a mechanical interference which prevented tether deployment beyond 256 meters. The Deployer was used in several off-nominal conditions to respond to these anomalies, which ultimately enabled a successful satellite retrieval and preservation of hardware integrity for a future re-flight. The paper begins with an introduction defining the significance of the TSS-1 mission. The body of the paper is divided into four major sections: (1) Description of Deployer System and Components, (2) Deployer Components/Systems Demonstrating Successful Operation, (3) Hardware Anomalies and Operational Responses, and (4) Design Modifications for the TSS-1R Re-flight Mission. Conclusions from the TSS-1 mission, including lessons learned are presented at the end of the manuscript.
Vleeshouwers, Vivianne G A A; Oliver, Richard P
2014-03-01
One of most important challenges in plant breeding is improving resistance to the plethora of pathogens that threaten our crops. The ever-growing world population, changing pathogen populations, and fungicide resistance issues have increased the urgency of this task. In addition to a vital inflow of novel resistance sources into breeding programs, the functional characterization and deployment of resistance also needs improvement. Therefore, plant breeders need to adopt new strategies and techniques. In modern resistance breeding, effectors are emerging as tools to accelerate and improve the identification, functional characterization, and deployment of resistance genes. Since genome-wide catalogues of effectors have become available for various pathogens, including biotrophs as well as necrotrophs, effector-assisted breeding has been shown to be successful for various crops. "Effectoromics" has contributed to classical resistance breeding as well as for genetically modified approaches. Here, we present an overview of how effector-assisted breeding and deployment is being exploited for various pathosystems.
AgSTAR’s Partner Program builds stronger relationships with state and non-governmental stakeholders to support all phases of anaerobic digester projects: planning, deployment, and long-term success.
Dillahunt-Aspillaga, Christina; Finch, Dezon; Massengale, Jill; Kretzmer, Tracy; Luther, Stephen L.; McCart, James A.
2014-01-01
Objective The purpose of this pilot study is 1) to develop an annotation schema and a training set of annotated notes to support the future development of a natural language processing (NLP) system to automatically extract employment information, and 2) to determine if information about employment status, goals and work-related challenges reported by service members and Veterans with mild traumatic brain injury (mTBI) and post-deployment stress can be identified in the Electronic Health Record (EHR). Design Retrospective cohort study using data from selected progress notes stored in the EHR. Setting Post-deployment Rehabilitation and Evaluation Program (PREP), an in-patient rehabilitation program for Veterans with TBI at the James A. Haley Veterans' Hospital in Tampa, Florida. Participants Service members and Veterans with TBI who participated in the PREP program (N = 60). Main Outcome Measures Documentation of employment status, goals, and work-related challenges reported by service members and recorded in the EHR. Results Two hundred notes were examined and unique vocational information was found indicating a variety of self-reported employment challenges. Current employment status and future vocational goals along with information about cognitive, physical, and behavioral symptoms that may affect return-to-work were extracted from the EHR. The annotation schema developed for this study provides an excellent tool upon which NLP studies can be developed. Conclusions Information related to employment status and vocational history is stored in text notes in the EHR system. Information stored in text does not lend itself to easy extraction or summarization for research and rehabilitation planning purposes. Development of NLP systems to automatically extract text-based employment information provides data that may improve the understanding and measurement of employment in this important cohort. PMID:25541956
New Caledonian crows attend to multiple functional properties of complex tools
St Clair, James J. H.; Rutz, Christian
2013-01-01
The ability to attend to the functional properties of foraging tools should affect energy-intake rates, fitness components and ultimately the evolutionary dynamics of tool-related behaviour. New Caledonian crows Corvus moneduloides use three distinct tool types for extractive foraging: non-hooked stick tools, hooked stick tools and tools cut from the barbed edges of Pandanus spp. leaves. The latter two types exhibit clear functional polarity, because of (respectively) a single terminal, crow-manufactured hook and natural barbs running along one edge of the leaf strip; in each case, the ‘hooks’ can only aid prey capture if the tool is oriented correctly by the crow during deployment. A previous experimental study of New Caledonian crows found that subjects paid little attention to the barbs of supplied (wide) pandanus tools, resulting in non-functional tool orientation during foraging. This result is puzzling, given the presumed fitness benefits of consistently orienting tools functionally in the wild. We investigated whether the lack of discrimination with respect to (wide) pandanus tool orientation also applies to hooked stick tools. We experimentally provided subjects with naturalistic replica tools in a range of orientations and found that all subjects used these tools correctly, regardless of how they had been presented. In a companion experiment, we explored the extent to which normally co-occurring tool features (terminal hook, curvature of the tool shaft and stripped bark at the hooked end) inform tool-orientation decisions, by forcing birds to deploy ‘unnatural’ tools, which exhibited these traits at opposite ends. Our subjects attended to at least two of the three tool features, although, as expected, the location of the hook was of paramount importance. We discuss these results in the context of earlier research and propose avenues for future work. PMID:24101625
New Caledonian crows attend to multiple functional properties of complex tools.
St Clair, James J H; Rutz, Christian
2013-11-19
The ability to attend to the functional properties of foraging tools should affect energy-intake rates, fitness components and ultimately the evolutionary dynamics of tool-related behaviour. New Caledonian crows Corvus moneduloides use three distinct tool types for extractive foraging: non-hooked stick tools, hooked stick tools and tools cut from the barbed edges of Pandanus spp. leaves. The latter two types exhibit clear functional polarity, because of (respectively) a single terminal, crow-manufactured hook and natural barbs running along one edge of the leaf strip; in each case, the 'hooks' can only aid prey capture if the tool is oriented correctly by the crow during deployment. A previous experimental study of New Caledonian crows found that subjects paid little attention to the barbs of supplied (wide) pandanus tools, resulting in non-functional tool orientation during foraging. This result is puzzling, given the presumed fitness benefits of consistently orienting tools functionally in the wild. We investigated whether the lack of discrimination with respect to (wide) pandanus tool orientation also applies to hooked stick tools. We experimentally provided subjects with naturalistic replica tools in a range of orientations and found that all subjects used these tools correctly, regardless of how they had been presented. In a companion experiment, we explored the extent to which normally co-occurring tool features (terminal hook, curvature of the tool shaft and stripped bark at the hooked end) inform tool-orientation decisions, by forcing birds to deploy 'unnatural' tools, which exhibited these traits at opposite ends. Our subjects attended to at least two of the three tool features, although, as expected, the location of the hook was of paramount importance. We discuss these results in the context of earlier research and propose avenues for future work.
Cross-platform validation and analysis environment for particle physics
NASA Astrophysics Data System (ADS)
Chekanov, S. V.; Pogrebnyak, I.; Wilbern, D.
2017-11-01
A multi-platform validation and analysis framework for public Monte Carlo simulation for high-energy particle collisions is discussed. The front-end of this framework uses the Python programming language, while the back-end is written in Java, which provides a multi-platform environment that can be run from a web browser and can easily be deployed at the grid sites. The analysis package includes all major software tools used in high-energy physics, such as Lorentz vectors, jet algorithms, histogram packages, graphic canvases, and tools for providing data access. This multi-platform software suite, designed to minimize OS-specific maintenance and deployment time, is used for online validation of Monte Carlo event samples through a web interface.
Financial Incentives to Enable Clean Energy Deployment: Policy Overview and Good Practices
DOE Office of Scientific and Technical Information (OSTI.GOV)
Cox, Sadie
Financial incentives have been widely implemented by governments around the world to support scaled up deployment of renewable energy and energy efficiency technologies and practices. As of 2015, at least 48 countries have adopted financial incentives to support renewable energy and energy efficiency deployment. Broader clean energy strategies and plans provide a crucial foundation for financial incentives that often complement regulatory policies such as renewable energy targets, standards, and other mandates. This policy brief provides a primer on key financial incentive design elements, lessons from different country experiences, and curated support resources for more detailed and country-specific financial incentive designmore » information.« less
NASA Astrophysics Data System (ADS)
Agnew, Donald L.; Vinkey, Victor F.; Runge, Fritz C.
1989-04-01
A study was conducted to determine how the Large Deployable Reflector (LDR) might benefit from the use of the space station for assembly, checkout, deployment, servicing, refurbishment, and technology development. Requirements that must be met by the space station to supply benefits for a selected scenario are summarized. Quantitative and qualitative data are supplied. Space station requirements for LDR which may be utilized by other missions are identified. A technology development mission for LDR is outlined and requirements summarized. A preliminary experiment plan is included. Space Station Data Base SAA 0020 and TDM 2411 are updated.
NASA Technical Reports Server (NTRS)
Agnew, Donald L.; Vinkey, Victor F.; Runge, Fritz C.
1989-01-01
A study was conducted to determine how the Large Deployable Reflector (LDR) might benefit from the use of the space station for assembly, checkout, deployment, servicing, refurbishment, and technology development. Requirements that must be met by the space station to supply benefits for a selected scenario are summarized. Quantitative and qualitative data are supplied. Space station requirements for LDR which may be utilized by other missions are identified. A technology development mission for LDR is outlined and requirements summarized. A preliminary experiment plan is included. Space Station Data Base SAA 0020 and TDM 2411 are updated.
Comparison of tablet-based strategies for incision planning in laser microsurgery
NASA Astrophysics Data System (ADS)
Schoob, Andreas; Lekon, Stefan; Kundrat, Dennis; Kahrs, Lüder A.; Mattos, Leonardo S.; Ortmaier, Tobias
2015-03-01
Recent research has revealed that incision planning in laser surgery deploying stylus and tablet outperforms state-of-the-art micro-manipulator-based laser control. Providing more detailed quantitation regarding that approach, a comparative study of six tablet-based strategies for laser path planning is presented. Reference strategy is defined by monoscopic visualization and continuous path drawing on a graphics tablet. Further concepts deploying stereoscopic or a synthesized laser view, point-based path definition, real-time teleoperation or a pen display are compared with the reference scenario. Volunteers were asked to redraw and ablate stamped lines on a sample. Performance is assessed by measuring planning accuracy, completion time and ease of use. Results demonstrate that significant differences exist between proposed concepts. The reference strategy provides more accurate incision planning than the stereo or laser view scenario. Real-time teleoperation performs best with respect to completion time without indicating any significant deviation in accuracy and usability. Point-based planning as well as the pen display provide most accurate planning and increased ease of use compared to the reference strategy. As a result, combining the pen display approach with point-based planning has potential to become a powerful strategy because of benefiting from improved hand-eye-coordination on the one hand and from a simple but accurate technique for path definition on the other hand. These findings as well as the overall usability scale indicating high acceptance and consistence of proposed strategies motivate further advanced tablet-based planning in laser microsurgery.
Previsic, Mirko; Karthikeyan, Anantha; Lewis, Tony; McCarthy, John
2017-07-26
Capex numbers are in $/kW, Opex numbers in $/kW-yr. Cost Estimates provided herein are based on concept design and basic engineering data and have high levels of uncertainties embedded. This reference economic scenario was done for a very large device version of the OE Buoy technology, which is not presently on Ocean Energy's technology development pathway but will be considered in future business plan development. The DOE reference site condition is considered a low power-density site, compared with many of the planned initial deployment locations for the OE Buoy. Many of the sites considered for the initial commercial deployment of the OE buoy feature much higher wave power densities and shorter period waves. Both of these characteristics will improve the OE buoy's commercial viability.
Improving health aid for a better planet: The planning, monitoring and evaluation tool (PLANET)
Sridhar, Devi; Car, Josip; Chopra, Mickey; Campbell, Harry; Woods, Ngaire; Rudan, Igor
2015-01-01
Background International development assistance for health (DAH) quadrupled between 1990 and 2012, from US$ 5.6 billion to US$ 28.1 billion. This generates an increasing need for transparent and replicable tools that could be used to set investment priorities, monitor the distribution of funding in real time, and evaluate the impact of those investments. Methods In this paper we present a methodology that addresses these three challenges. We call this approach PLANET, which stands for planning, monitoring and evaluation tool. Fundamentally, PLANET is based on crowdsourcing approach to obtaining information relevant to deployment of large–scale programs. Information is contributed in real time by a diverse group of participants involved in the program delivery. Findings PLANET relies on real–time information from three levels of participants in large–scale programs: funders, managers and recipients. At each level, information is solicited to assess five key risks that are most relevant to each level of operations. The risks at the level of funders involve systematic neglect of certain areas, focus on donor’s interests over that of program recipients, ineffective co–ordination between donors, questionable mechanisms of delivery and excessive loss of funding to “middle men”. At the level of managers, the risks are corruption, lack of capacity and/or competence, lack of information and /or communication, undue avoidance of governmental structures / preference to non–governmental organizations and exclusion of local expertise. At the level of primary recipients, the risks are corruption, parallel operations / “verticalization”, misalignment with local priorities and lack of community involvement, issues with ethics, equity and/or acceptability, and low likelihood of sustainability beyond the end of the program’s implementation. Interpretation PLANET is intended as an additional tool available to policy–makers to prioritize, monitor and evaluate large–scale development programs. In this, it should complement tools such as LiST (for health care/interventions), EQUIST (for health care/interventions) and CHNRI (for health research), which also rely on information from local experts and on local context to set priorities in a transparent, user–friendly, replicable, quantifiable and specific, algorithmic–like manner. PMID:26322228
Improving health aid for a better planet: The planning, monitoring and evaluation tool (PLANET).
Sridhar, Devi; Car, Josip; Chopra, Mickey; Campbell, Harry; Woods, Ngaire; Rudan, Igor
2015-12-01
International development assistance for health (DAH) quadrupled between 1990 and 2012, from US$ 5.6 billion to US$ 28.1 billion. This generates an increasing need for transparent and replicable tools that could be used to set investment priorities, monitor the distribution of funding in real time, and evaluate the impact of those investments. In this paper we present a methodology that addresses these three challenges. We call this approach PLANET, which stands for planning, monitoring and evaluation tool. Fundamentally, PLANET is based on crowdsourcing approach to obtaining information relevant to deployment of large-scale programs. Information is contributed in real time by a diverse group of participants involved in the program delivery. PLANET relies on real-time information from three levels of participants in large-scale programs: funders, managers and recipients. At each level, information is solicited to assess five key risks that are most relevant to each level of operations. The risks at the level of funders involve systematic neglect of certain areas, focus on donor's interests over that of program recipients, ineffective co-ordination between donors, questionable mechanisms of delivery and excessive loss of funding to "middle men". At the level of managers, the risks are corruption, lack of capacity and/or competence, lack of information and /or communication, undue avoidance of governmental structures / preference to non-governmental organizations and exclusion of local expertise. At the level of primary recipients, the risks are corruption, parallel operations / "verticalization", misalignment with local priorities and lack of community involvement, issues with ethics, equity and/or acceptability, and low likelihood of sustainability beyond the end of the program's implementation. PLANET is intended as an additional tool available to policy-makers to prioritize, monitor and evaluate large-scale development programs. In this, it should complement tools such as LiST (for health care/interventions), EQUIST (for health care/interventions) and CHNRI (for health research), which also rely on information from local experts and on local context to set priorities in a transparent, user-friendly, replicable, quantifiable and specific, algorithmic-like manner.
NASA Technical Reports Server (NTRS)
Mclean, David; Yen, Wen
1989-01-01
Plan Specification Tools (PST) are tools that allow the user to specify satellite mission plans in terms of satellite activities, relevent orbital events, and targets for observation. The output of these tools is a set of knowledge bases and environmental events which can then be used by a Planning And Resource Reasoning (PARR) shell to build a schedule. PARR is a reactive planning shell which is capable of reasoning about actions in the satellite mission planning domain. Each of the PST tools and PARR are described as well as the use of PARR for scheduling computer usage in the multisatellite operations control center at Goddard Space Flight Center.
Renewable Energy Deployment in Colorado and the West: Extended Policy Sensitivities
DOE Office of Scientific and Technical Information (OSTI.GOV)
Barrows, Clayton P.; Stoll, Brady; Mooney, Meghan E.
The Resource Planning Model is a capacity expansion model designed for a regional power system, such as a utility service territory, state, or balancing authority. We apply a geospatial analysis to Resource Planning Model renewable energy capacity expansion results to understand the likelihood of renewable development on various lands within Colorado.
ERIC Educational Resources Information Center
Bellamy, Al
2007-01-01
This study explored influences that perceptions of new technology implementation and planning processes, and dimensions of organizational climate have on perceptions of new technology deployment effectiveness. It also examined the extent to which dimensions of organizational climate moderates the relationships among new technology implementation,…
49 CFR 268.15 - Form and contents of applications for preconstruction planning assistance.
Code of Federal Regulations, 2013 CFR
2013-10-01
... have Maglev projects are invited to submit applications in Phase I of the Maglev Deployment Program..., including but not necessarily limited to: (1) Preconstruction planning work as is needed to develop a Maglev... made a definitive choice of the particular Maglev technology proposed to be included, a description of...
49 CFR 268.15 - Form and contents of applications for preconstruction planning assistance.
Code of Federal Regulations, 2014 CFR
2014-10-01
... have Maglev projects are invited to submit applications in Phase I of the Maglev Deployment Program..., including but not necessarily limited to: (1) Preconstruction planning work as is needed to develop a Maglev... made a definitive choice of the particular Maglev technology proposed to be included, a description of...
49 CFR 268.15 - Form and contents of applications for preconstruction planning assistance.
Code of Federal Regulations, 2012 CFR
2012-10-01
... have Maglev projects are invited to submit applications in Phase I of the Maglev Deployment Program..., including but not necessarily limited to: (1) Preconstruction planning work as is needed to develop a Maglev... made a definitive choice of the particular Maglev technology proposed to be included, a description of...
49 CFR 268.15 - Form and contents of applications for preconstruction planning assistance.
Code of Federal Regulations, 2010 CFR
2010-10-01
... have Maglev projects are invited to submit applications in Phase I of the Maglev Deployment Program..., including but not necessarily limited to: (1) Preconstruction planning work as is needed to develop a Maglev... made a definitive choice of the particular Maglev technology proposed to be included, a description of...
49 CFR 268.15 - Form and contents of applications for preconstruction planning assistance.
Code of Federal Regulations, 2011 CFR
2011-10-01
... have Maglev projects are invited to submit applications in Phase I of the Maglev Deployment Program..., including but not necessarily limited to: (1) Preconstruction planning work as is needed to develop a Maglev... made a definitive choice of the particular Maglev technology proposed to be included, a description of...
National Ignition Facility Control and Information System Operational Tools
DOE Office of Scientific and Technical Information (OSTI.GOV)
Marshall, C D; Beeler, R G; Bowers, G A
The National Ignition Facility (NIF) in Livermore, California, is the world's highest-energy laser fusion system and one of the premier large scale scientific projects in the United States. The system is designed to setup and fire a laser shot to a fusion ignition or high energy density target at rates up to a shot every 4 hours. NIF has 192 laser beams delivering up to 1.8 MJ of energy to a {approx}2 mm target that is planned to produce >100 billion atm of pressure and temperatures of >100 million degrees centigrade. NIF is housed in a ten-story building footprint themore » size of three football fields as shown in Fig. 1. Commissioning was recently completed and NIF will be formally dedicated at Lawrence Livermore National Laboratory on May 29, 2009. The control system has 60,000 hardware controls points and employs 2 million lines of control system code. The control room has highly automated equipment setup prior to firing laser system shots. This automation has a data driven implementation that is conducive to dynamic modification and optimization depending on the shot goals defined by the end user experimenters. NIF has extensive facility machine history and infrastructure maintenance workflow tools both under development and deployed. An extensive operational tools suite has been developed to support facility operations including experimental shot setup, machine readiness, machine health and safety, and machine history. The following paragraphs discuss the current state and future upgrades to these four categories of operational tools.« less
Ares I-X Ground Diagnostic Prototype
NASA Technical Reports Server (NTRS)
Schwabacher, Mark A.; Martin, Rodney Alexander; Waterman, Robert D.; Oostdyk, Rebecca Lynn; Ossenfort, John P.; Matthews, Bryan
2010-01-01
The automation of pre-launch diagnostics for launch vehicles offers three potential benefits: improving safety, reducing cost, and reducing launch delays. The Ares I-X Ground Diagnostic Prototype demonstrated anomaly detection, fault detection, fault isolation, and diagnostics for the Ares I-X first-stage Thrust Vector Control and for the associated ground hydraulics while the vehicle was in the Vehicle Assembly Building at Kennedy Space Center (KSC) and while it was on the launch pad. The prototype combines three existing tools. The first tool, TEAMS (Testability Engineering and Maintenance System), is a model-based tool from Qualtech Systems Inc. for fault isolation and diagnostics. The second tool, SHINE (Spacecraft Health Inference Engine), is a rule-based expert system that was developed at the NASA Jet Propulsion Laboratory. We developed SHINE rules for fault detection and mode identification, and used the outputs of SHINE as inputs to TEAMS. The third tool, IMS (Inductive Monitoring System), is an anomaly detection tool that was developed at NASA Ames Research Center. The three tools were integrated and deployed to KSC, where they were interfaced with live data. This paper describes how the prototype performed during the period of time before the launch, including accuracy and computer resource usage. The paper concludes with some of the lessons that we learned from the experience of developing and deploying the prototype.
Digital technologies in support of flood resilience: A case study from Nepal
NASA Astrophysics Data System (ADS)
Liu, Wei; McCallum, Ian; See, Linda; Dugar, Sumit; Laso-Bayas, Juan-Carlos
2016-04-01
This paper presents ongoing efforts to support flood resilience in the Karnali basin in Nepal through the provision of different forms of digital technology. Flood Risk Geo-Wiki is an online visualization and crowdsourcing tool, which has been adapted to display flood risk maps at the global scale as well as information of relevance to planners and the community at the local level. Community-based flood risk maps, which have traditionally been drawn on paper, are being digitized and integrated with OpenStreetMap to provide better access to this collective knowledge base. Mobile phones, using the GeoODK (Geographical Open Data Kit) questionnaire builder, are being deployed to collect georeferenced information on flood risks and vulnerability, which can be used to validate flood models and design action plans and strategies for coping with future flood events. These types of digital technologies are simple to implement yet together can help support flood prone communities.
Regional Patterns and Spatial Clusters of Nonstationarities in Annual Peak Instantaneous Streamflow
NASA Astrophysics Data System (ADS)
White, K. D.; Baker, B.; Mueller, C.; Villarini, G.; Foley, P.; Friedman, D.
2017-12-01
Information about hydrologic changes resulting from changes in climate, land use, and land cover is a necessity planning and design or water resources infrastructure. The United States Army Corps of Engineers (USACE) evaluated and selected 12 methods to detect abrupt and slowly varying nonstationarities in records of maximum peak annual flows. They deployed a publicly available tool[1]in 2016 and a guidance document in 2017 to support identification of nonstationarities in a reproducible manner using a robust statistical framework. This statistical framework has now been applied to streamflow records across the continental United States to explore the presence of regional patterns and spatial clusters of nonstationarities in peak annual flow. Incorporating this geographic dimension into the detection of nonstationarities provides valuable insight for the process of attribution of these significant changes. This poster summarizes the methods used and provides the results of the regional analysis. [1] Available here - http://www.corpsclimate.us/ptcih.cfm
Microtechnology management considering test and cost aspects for stacked 3D ICs with MEMS
NASA Astrophysics Data System (ADS)
Hahn, K.; Wahl, M.; Busch, R.; Grünewald, A.; Brück, R.
2018-01-01
Innovative automotive systems require complex semiconductor devices currently only available in consumer grade quality. The European project TRACE will develop and demonstrate methods, processes, and tools to facilitate usage of Consumer Electronics (CE) components to be deployable more rapidly in the life-critical automotive domain. Consumer electronics increasingly use heterogeneous system integration methods and "More than Moore" technologies, which are capable to combine different circuit domains (Analog, Digital, RF, MEMS) and which are integrated within SiP or 3D stacks. Making these technologies or at least some of the process steps available under automotive electronics requirements is an important goal to keep pace with the growing demand for information processing within cars. The approach presented in this paper aims at a technology management and recommendation system that covers technology data, functional and non-functional constraints, and application scenarios, and that will comprehend test planning and cost consideration capabilities.
Design and Development of a Web-Based Self-Monitoring System to Support Wellness Coaching.
Zarei, Reza; Kuo, Alex
2017-01-01
We analyzed, designed and deployed a web-based, self-monitoring system to support wellness coaching. A wellness coach can plan for clients' exercise and diet through the system and is able to monitor the changes in body dimensions and body composition that the client reports. The system can also visualize the client's data in form of graphs for both the client and the coach. Both parties can also communicate through the messaging feature embedded in the application. A reminder system is also incorporated into the system and sends reminder messages to the clients when their reporting is due. The web-based self-monitoring application uses Oracle 11g XE as the backend database and Application Express 4.2 as user interface development tool. The system allowed users to access, update and modify data through web browser anytime, anywhere, and on any device.
NASA Technical Reports Server (NTRS)
Kuroda, Vanessa M.; Allard, Mark R.; Lewis, Brian; Lindsay, Michael
2014-01-01
September 6, 2013 through April 21, 2014 marked the mission lifecycle of the highly successful LADEE (Lunar Atmosphere and Dust Environment Explorer) mission that orbited the moon to gather detailed information about the thin lunar atmosphere. This paper will address the development, risks, and lessons learned regarding the specification, selection, and deployment of LADEE's unique Radio Frequency based communications subsystem and supporting tools. This includes the Electronic Ground Support Equipment (EGSE), test regimes, and RF dynamic link analysis environment developed to meet mission requirements for small, flexible, low cost, high performance, fast turnaround, and reusable spacecraft communication capabilities with easy and reliable application to future similar low cost small satellite missions over widely varying needs for communications and communications system complexity. LADEE communication subsystem key components, architecture, and mission performance will be reviewed toward applicability for future mission planning, design, and utilization.
End effector of the Discovery's RMS with tools moves toward Syncom-IV
1985-04-17
51D-44-046 (17 April 1985) --- The Space Shuttle Discovery's Remote Manipulator System (RMS) arm and two specially designed extensions move toward the troubled Syncom-IV (LEASAT) communications satellite during a station keeping mode of the two spacecraft in Earth orbit. Inside the Shuttle's cabin, astronaut Rhea Seddon, 51D mission specialist, controlled the Canadian-built arm in an attempt to move an external lever on the satellite. Crewmembers learned of the satellite's problems shortly after it was deployed from the cargo bay on April 13, 1985. The arm achieved physical contact with the lever as planned. However, the satellite did not respond to the contact as hoped. A 70mm handheld Hassellblad camera, aimed through Discovery's windows, recorded this frame -- one of the first to be released to news media following return of the seven-member crew on April 17, 1985.
Data warehousing: toward knowledge management.
Shams, K; Farishta, M
2001-02-01
With rapid changes taking place in the practice and delivery of health care, decision support systems have assumed an increasingly important role. More and more health care institutions are deploying data warehouse applications as decision support tools for strategic decision making. By making the right information available at the right time to the right decision makers in the right manner, data warehouses empower employees to become knowledge workers with the ability to make the right decisions and solve problems, creating strategic leverage for the organization. Health care management must plan and implement data warehousing strategy using a best practice approach. Through the power of data warehousing, health care management can negotiate bettermanaged care contracts based on the ability to provide accurate data on case mix and resource utilization. Management can also save millions of dollars through the implementation of clinical pathways in better resource utilization and changing physician behavior to best practices based on evidence-based medicine.
A manipulator arm for zero-g simulations
NASA Technical Reports Server (NTRS)
Brodie, S. B.; Grant, C.; Lazar, J. J.
1975-01-01
A 12-ft counterbalanced Slave Manipulator Arm (SMA) was designed and fabricated to be used for resolving the questions of operational applications, capabilities, and limitations for such remote manned systems as the Payload Deployment and Retrieval Mechanism (PDRM) for the shuttle, the Free-Flying Teleoperator System, the Advanced Space Tug, and Planetary Rovers. As a developmental tool for the shuttle manipulator system (or PDRM), the SMA represents an approximate one-quarter scale working model for simulating and demonstrating payload handling, docking assistance, and satellite servicing. For the Free-Flying Teleoperator System and the Advanced Tug, the SMA provides a near full-scale developmental tool for satellite servicing, docking, and deployment/retrieval procedures, techniques, and support equipment requirements. For the Planetary Rovers, it provides an oversize developmental tool for sample handling and soil mechanics investigations. The design of the SMA was based on concepts developed for a 40-ft NASA technology arm to be used for zero-g shuttle manipulator simulations.
2006-06-01
technology , communication , and incremental and manageable deployment plans. Hospital Leadership Support is Essential AHLTA is supported by the senior leaders...Information Technology The importance of information technology and the desire to utilize it for improved health care outcomes is part of the NMCSD... technology applications had a direct positive impact on AHLTA’s deployment at NMCSD. Communication As previously discussed in the leadership
1985-04-01
Australia and New Zealand force of SS-18s and SS-19s, their plans to reload preserves peace and stability in a region that is ICBM silos, and the extensive...Defense Ministry announced that the USSR was beginning to deploy a new generation of nuclear-armed, air-launched and sea-launched cruise missiles. The...increasingly ambitious Soviet procurement and deployment of ma- jor categories of new armaments. The success that the Soviets have achieved in both
Planning U.S. General Purpose Forces: The Theater Nuclear Forces
1977-01-01
usefulness in combat. All U.S. nuclear weapons deployed in Europe are fitted with Permissive Action Links (PAL), coded devices designed to impede...may be proposed. The Standard Missile 2, the Harpoon missile, the Mk48 tor- pedo , and the SUBROC anti-submarine rocket are all being considered for...Permissive Action Link . A coded device attached to nuclear weapons deployed abroad that impedes the unauthorized arming or firing of the weapon. Pershing
Ecological impact assessments fail to reduce risk of bat casualties at wind farms.
Lintott, Paul R; Richardson, Suzanne M; Hosken, David J; Fensome, Sophie A; Mathews, Fiona
2016-11-07
Demand for renewable energy is rising exponentially. While this has benefits in reducing greenhouse gas emissions, there may be costs to biodiversity [1]. Environmental Impact Assessments (EIAs) are the main tool used across the world to predict the overall positive and negative effects of renewable energy developments before planning consent is given, and the Ecological Impact Assessments (EcIAs) within them assess their species-specific effects. Given that EIAs are undertaken globally, are extremely expensive, and are enshrined in legislation, their place in evidence-based decision making deserves evaluation. Here we assess how well EIAs of wind-farm developments protect bats. We found they do not predict the risks to bats accurately, and even in those cases where high risk was correctly identified, the mitigation deployed did not avert the risk. Given that the primary purpose of an EIA is to make planning decisions evidence-based, our results indicate that EIA mitigation strategies used to date have been ineffective in protecting bats. In the future, greater emphasis should be placed on assessing the actual impacts post-construction and on developing effective mitigation strategies. Copyright © 2016 The Author(s). Published by Elsevier Ltd.. All rights reserved.
NASA Astrophysics Data System (ADS)
Hagan, D. E.; Bingham, G. E.; Predina, J.; Gu, D.; Sabet-Peyman, F.; Wang, C.; de Amici, G.; Plonski, M.; Farrow, S. V.; Hohn, J.; Esplin, M.; Zavyalov, V.; Fish, C. S.; Glumb, R.; Wells, S.; Suwinski, L.; Strong, J.; Behrens, C.; Kilcoyne, H.; Feeley, J.; Kratz, G.; Tremblay, D. A.
2009-12-01
The Cross-Track Infrared Sounder (CrIS) together with the Advanced Technology Microwave Sounder will provide retrievals of atmospheric moisture and temperature profiles for the National Polar-orbiting Operational Environmental Satellite System (NPOESS). The NPOESS is the next generation of low Earth orbiting weather and climate satellites managed by the tri-agency Integrated Program Office, which includes the Department of Commerce, Department of Defense and the National Aeronautics and Space Administration. The CrIS is a Fourier-transform Michelson interferometer covering the spectral range of 3.9 to 15.4 microns (650 to 2550 wavenumbers) developed by ITT under contract to Northrop Grumman Aerospace Systems. The first deployment of the CrIS (Flight Model 1) is scheduled for 2010 on the NPOESS Preparatory Project (NPP) satellite, an early instrument risk reduction component of the NPOESS mission. The analysis and data results from comprehensive TVAC testing of the CrIS FM1 sensor demonstrate a very accurate radiometric and spectral calibration system. We describe instrument performance parameters, and the end-to-end plans and analysis tools for on-orbit verification of sensor characteristics and validation of the SDR radiance products.
78 FR 54241 - Proposed Information Collection; Comment Request; BroadbandMatch Web Site Tool
Federal Register 2010, 2011, 2012, 2013, 2014
2013-09-03
... Information Collection; Comment Request; BroadbandMatch Web Site Tool AGENCY: National Telecommunications and... goal of increased broadband deployment and use in the United States. The BroadbandMatch Web site began... empowering technology effectively. II. Method of Collection BroadbandMatch users access the Web site through...
Mobile Adaptive Communication Support for Vocabulary Acquisition
ERIC Educational Resources Information Center
Epp, Carrie Demmans
2014-01-01
This work explores the use of an adaptive mobile tool for language learning. A school-based deployment study showed that the tool supported learning. A second study is being conducted in informal learning environments. Current work focuses on building models that increase our understanding of the relationship between application usage and learning.
Song, Ting; Li, Nan; Zarepisheh, Masoud; Li, Yongbao; Gautier, Quentin; Zhou, Linghong; Mell, Loren; Jiang, Steve; Cerviño, Laura
2016-01-01
Intensity-modulated radiation therapy (IMRT) currently plays an important role in radiotherapy, but its treatment plan quality can vary significantly among institutions and planners. Treatment plan quality control (QC) is a necessary component for individual clinics to ensure that patients receive treatments with high therapeutic gain ratios. The voxel-weighting factor-based plan re-optimization mechanism has been proved able to explore a larger Pareto surface (solution domain) and therefore increase the possibility of finding an optimal treatment plan. In this study, we incorporated additional modules into an in-house developed voxel weighting factor-based re-optimization algorithm, which was enhanced as a highly automated and accurate IMRT plan QC tool (TPS-QC tool). After importing an under-assessment plan, the TPS-QC tool was able to generate a QC report within 2 minutes. This QC report contains the plan quality determination as well as information supporting the determination. Finally, the IMRT plan quality can be controlled by approving quality-passed plans and replacing quality-failed plans using the TPS-QC tool. The feasibility and accuracy of the proposed TPS-QC tool were evaluated using 25 clinically approved cervical cancer patient IMRT plans and 5 manually created poor-quality IMRT plans. The results showed high consistency between the QC report quality determinations and the actual plan quality. In the 25 clinically approved cases that the TPS-QC tool identified as passed, a greater difference could be observed for dosimetric endpoints for organs at risk (OAR) than for planning target volume (PTV), implying that better dose sparing could be achieved in OAR than in PTV. In addition, the dose-volume histogram (DVH) curves of the TPS-QC tool re-optimized plans satisfied the dosimetric criteria more frequently than did the under-assessment plans. In addition, the criteria for unsatisfied dosimetric endpoints in the 5 poor-quality plans could typically be satisfied when the TPS-QC tool generated re-optimized plans without sacrificing other dosimetric endpoints. In addition to its feasibility and accuracy, the proposed TPS-QC tool is also user-friendly and easy to operate, both of which are necessary characteristics for clinical use.
NASA Astrophysics Data System (ADS)
Sadighi, Kira; Coffey, Evan; Polidori, Andrea; Feenstra, Brandon; Lv, Qin; Henze, Daven K.; Hannigan, Michael
2018-03-01
Sensor networks are being more widely used to characterize and understand compounds in the atmosphere like ozone (O3). This study employs a measurement tool, called the U-Pod, constructed at the University of Colorado Boulder, to investigate spatial and temporal variability of O3 in a 200 km2 area of Riverside County near Los Angeles, California. This tool contains low-cost sensors to collect ambient data at non-permanent locations. The U-Pods were calibrated using a pre-deployment field calibration technique; all the U-Pods were collocated with regulatory monitors. After collocation, the U-Pods were deployed in the area mentioned. A subset of pods was deployed at two local regulatory air quality monitoring stations providing validation for the collocation calibration method. Field validation of sensor O3 measurements to minute-resolution reference observations resulted in R2 and root mean squared errors (RMSEs) of 0.95-0.97 and 4.4-5.9 ppbv, respectively. Using the deployment data, ozone concentrations were observed to vary on this small spatial scale. In the analysis based on hourly binned data, the median R2 values between all possible U-Pod pairs varied from 0.52 to 0.86 for ozone during the deployment. The medians of absolute differences were calculated between all possible pod pairs, 21 pairs total. The median values of those median absolute differences for each hour of the day varied between 2.2 and 9.3 ppbv for the ozone deployment. Since median differences between U-Pod concentrations during deployment are larger than the respective root mean square error values, we can conclude that there is spatial variability in this criteria pollutant across the study area. This is important because it means that citizens may be exposed to more, or less, ozone than they would assume based on current regulatory monitoring.
NASA Astrophysics Data System (ADS)
Herd, A.; Wolff, M.
2012-01-01
Extended mission operations, such as human spaceflight to Mars provide an opportunity for take current human exploration beyond Low Earth Orbit, such as the operations undertaken on the International Space Station (ISS). This opportunity also presents a challenge in terms of extending what we currently understand as "remote operations" performed on ISS, offering learning beyond that gained from the successful moon- lander expeditions. As such there is a need to assess how the existing operations concept of ground support teams directing (and supporting) on-orbit ISS operations can be applied in the extended mission concept. The current mission support concept involves three interacting operations products - a short term plan, crew procedures and flight rules. Flight rules (for ISS operations) currently provide overall planning, engineering and operations constraints (including those derived from a safety perspective) in the form of a rule book. This paper will focus specifically on flight rules, and describe the current use of them, and assess the future role of flight rules to support exploration, including the deployment of decision support tools (DSTs) to ensure flight rule compliancy for missions with minimal ground support. Taking consideration of the historical development of pre-planned decisions, and their manifestation within the operations environment, combined with the extended remoteness of human exploration missions, we will propose a future development of this product and a platform on which it could be presented.
Rover Sequencing and Visualization Program
NASA Technical Reports Server (NTRS)
Cooper, Brian; Hartman, Frank; Maxwell, Scott; Yen, Jeng; Wright, John; Balacuit, Carlos
2005-01-01
The Rover Sequencing and Visualization Program (RSVP) is the software tool for use in the Mars Exploration Rover (MER) mission for planning rover operations and generating command sequences for accomplishing those operations. RSVP combines three-dimensional (3D) visualization for immersive exploration of the operations area, stereoscopic image display for high-resolution examination of the downlinked imagery, and a sophisticated command-sequence editing tool for analysis and completion of the sequences. RSVP is linked with actual flight-code modules for operations rehearsal to provide feedback on the expected behavior of the rover prior to committing to a particular sequence. Playback tools allow for review of both rehearsed rover behavior and downlinked results of actual rover operations. These can be displayed simultaneously for comparison of rehearsed and actual activities for verification. The primary inputs to RSVP are downlink data products from the Operations Storage Server (OSS) and activity plans generated by the science team. The activity plans are high-level goals for the next day s activities. The downlink data products include imagery, terrain models, and telemetered engineering data on rover activities and state. The Rover Sequence Editor (RoSE) component of RSVP performs activity expansion to command sequences, command creation and editing with setting of command parameters, and viewing and management of rover resources. The HyperDrive component of RSVP performs 2D and 3D visualization of the rover s environment, graphical and animated review of rover-predicted and telemetered state, and creation and editing of command sequences related to mobility and Instrument Deployment Device (IDD) operations. Additionally, RoSE and HyperDrive together evaluate command sequences for potential violations of flight and safety rules. The products of RSVP include command sequences for uplink that are stored in the Distributed Object Manager (DOM) and predicted rover state histories stored in the OSS for comparison and validation of downlinked telemetry. The majority of components comprising RSVP utilize the MER command and activity dictionaries to automatically customize the system for MER activities. Thus, RSVP, being highly data driven, may be tailored to other missions with minimal effort. In addition, RSVP uses a distributed, message-passing architecture to allow multitasking, and collaborative visualization and sequence development by scattered team members.
Update on Rover Sequencing and Visualization Program
NASA Technical Reports Server (NTRS)
Cooper, Brian; Hartman, Frank; Maxwell, Scott; Yen, Jeng; Wright, John; Balacuit, Carlos
2005-01-01
The Rover Sequencing and Visualization Program (RSVP) has been updated. RSVP was reported in Rover Sequencing and Visualization Program (NPO-30845), NASA Tech Briefs, Vol. 29, No. 4 (April 2005), page 38. To recapitulate: The Rover Sequencing and Visualization Program (RSVP) is the software tool to be used in the Mars Exploration Rover (MER) mission for planning rover operations and generating command sequences for accomplishing those operations. RSVP combines three-dimensional (3D) visualization for immersive exploration of the operations area, stereoscopic image display for high-resolution examination of the downlinked imagery, and a sophisticated command-sequence editing tool for analysis and completion of the sequences. RSVP is linked with actual flight code modules for operations rehearsal to provide feedback on the expected behavior of the rover prior to committing to a particular sequence. Playback tools allow for review of both rehearsed rover behavior and downlinked results of actual rover operations. These can be displayed simultaneously for comparison of rehearsed and actual activities for verification. The primary inputs to RSVP are downlink data products from the Operations Storage Server (OSS) and activity plans generated by the science team. The activity plans are high-level goals for the next day s activities. The downlink data products include imagery, terrain models, and telemetered engineering data on rover activities and state. The Rover Sequence Editor (RoSE) component of RSVP performs activity expansion to command sequences, command creation and editing with setting of command parameters, and viewing and management of rover resources. The HyperDrive component of RSVP performs 2D and 3D visualization of the rover s environment, graphical and animated review of rover predicted and telemetered state, and creation and editing of command sequences related to mobility and Instrument Deployment Device (robotic arm) operations. Additionally, RoSE and HyperDrive together evaluate command sequences for potential violations of flight and safety rules. The products of RSVP include command sequences for uplink that are stored in the Distributed Object Manager (DOM) and predicted rover state histories stored in the OSS for comparison and validation of downlinked telemetry. The majority of components comprising RSVP utilize the MER command and activity dictionaries to automatically customize the system for MER activities.
Methodology for fleet deployment decisions. Final report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Stremel, J.; Matousek, M.
1995-01-01
In today`s more competitive energy market, selecting investment and operating plans for a generating system, specific plants, and major plant components is becoming increasingly critical and complex. As utilities consider off-system sales, the key factor for fleet deployment decisions is no longer simply minimizing revenue requirements. Rather, system-level value dominates. This is a measure that can be difficult to determine in the context of traditional decision making methods. Selecting the best fleet deployment option requires the ability to account for multiple sources of value under uncertain conditions for multiple utility stakeholders. The object of this paper was to develope andmore » test an approach for assessing the system-wide value of alternative fleet deployment decisions. This was done, and the approach was tested at Consolidated Edison and at Central Illinois Public Service Company.« less
Barton, Christopher A; Dobson, Annette; Treloar, Susan A; McClintock, Christine; McFarlane, Alexander C
2008-12-01
The Australian Government has supported the establishment of a Deployment Health Surveillance Program for the Australian Defence Force. Although some health screening mechanisms already exist for Australian Defence Force personnel, until now health data have been used largely for clinical management at an individual level and have not been aggregated to identify trends in health and risk factors in the shorter or longer term. We identify challenges for and potential benefits of health surveillance in the military context, describe features of the Program and progress to date. Retrospective and cross-sectional projects based on deployments to the Near North Area of Influence since 1997 are under way. A planned prospective model of health surveillance for those deploying to the Middle East promises more timely attention to any emerging health problems for military personnel and veterans.
Development of a QFD-based expert system for CNC turning centre selection
NASA Astrophysics Data System (ADS)
Prasad, Kanika; Chakraborty, Shankar
2015-12-01
Computer numerical control (CNC) machine tools are automated devices capable of generating complicated and intricate product shapes in shorter time. Selection of the best CNC machine tool is a critical, complex and time-consuming task due to availability of a wide range of alternatives and conflicting nature of several evaluation criteria. Although, the past researchers had attempted to select the appropriate machining centres using different knowledge-based systems, mathematical models and multi-criteria decision-making methods, none of those approaches has given due importance to the voice of customers. The aforesaid limitation can be overcome using quality function deployment (QFD) technique, which is a systematic approach for integrating customers' needs and designing the product to meet those needs first time and every time. In this paper, the adopted QFD-based methodology helps in selecting CNC turning centres for a manufacturing organization, providing due importance to the voice of customers to meet their requirements. An expert system based on QFD technique is developed in Visual BASIC 6.0 to automate the CNC turning centre selection procedure for different production plans. Three illustrative examples are demonstrated to explain the real-time applicability of the developed expert system.
NASA Technical Reports Server (NTRS)
Walker, Steven A.; Clowdsley, Martha S.; Abston, H. Lee; Simon, Hatthew A.; Gallegos, Adam M.
2013-01-01
NASA has plans for long duration missions beyond low Earth orbit (LEO). Outside of LEO, large solar particle events (SPEs), which occur sporadically, can deliver a very large dose in a short amount of time. The relatively low proton energies make SPE shielding practical, and the possibility of the occurrence of a large event drives the need for SPE shielding for all deep space missions. The Advanced Exploration Systems (AES) RadWorks Storm Shelter Team was charged with developing minimal mass SPE storm shelter concepts for missions beyond LEO. The concepts developed included "wearable" shields, shelters that could be deployed at the onset of an event, and augmentations to the crew quarters. The radiation transport codes, human body models, and vehicle geometry tools contained in the On-Line Tool for the Assessment of Radiation In Space (OLTARIS) were used to evaluate the protection provided by each concept within a realistic space habitat and provide the concept designers with shield thickness requirements. Several different SPE models were utilized to examine the dependence of the shield requirements on the event spectrum. This paper describes the radiation analysis methods and the results of these analyses for several of the shielding concepts.
Whitten, Pamela; Holtz, Bree; Laplante, Carolyn; Alverson, Dale; Krupinski, Elizabeth
2010-12-01
the goal of this study was to provide an independent and objective evaluation of the implementation of the Federal Communications Commission's Rural Health Care Pilot Program. thirty-nine of the programs that were provided funding through this program were interviewed and asked about their project deployment, network planning, and the involvement of their state in implementation. RESULTS showed that programs recruited project team members from a variety of fields to fulfill different roles. Network partners were often chosen because they were stakeholders in the outcome of the project and because they had a past working relationship with the grant-receiving programs. In terms of deployment, many programs had made progress in filling out necessary paperwork and were tracking milestones, but had experienced changes since first receiving funding, such as losing participants. Additionally, many encountered challenges that inhibited deployment, such as coping with rule fluctuations. Many of the programs received support from their respective state governments in project development, often through matching funds, but few states were involved in the actual management of projects. as rural healthcare facilities often lack the information technology infrastructure compared with many urban facilities, it is important to understand the implementation process for programs such as the Rural Health Care Pilot Program and to examine what contributes to progress, stagnation, or disintegration. Although the programs reported some success, almost all had encountered challenges that inhibited implementation. A follow-up study is planned to further investigate deployment and determine the implications of Federal Communications Commission funding.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Dagher, Habib; Viselli, Anthony; Goupee, Andrew
Volume II of the Final Report for the DeepCwind Consortium National Research Program funded by US Department of Energy Award Number: DE-EE0003278.001 summarizes the design, construction, deployment, testing, numerical model validation, retrieval, and post-deployment inspection of the VolturnUS 1:8-scale floating wind turbine prototype deployed off Castine, Maine on June 2nd, 2013. The 1:8 scale VolturnUS design served as a de-risking exercise for a commercial multi-MW VolturnUS design. The American Bureau of Shipping Guide for Building and Classing Floating Offshore Wind Turbine Installations was used to design the prototype. The same analysis methods, design methods, construction techniques, deployment methods, mooring, andmore » anchoring planned for full-scale were used. A commercial 20kW grid-connected turbine was used and was the first offshore wind turbine in the US.« less
Modeling Constellation Virtual Missions Using the Vdot(Trademark) Process Management Tool
NASA Technical Reports Server (NTRS)
Hardy, Roger; ONeil, Daniel; Sturken, Ian; Nix, Michael; Yanez, Damian
2011-01-01
The authors have identified a software tool suite that will support NASA's Virtual Mission (VM) effort. This is accomplished by transforming a spreadsheet database of mission events, task inputs and outputs, timelines, and organizations into process visualization tools and a Vdot process management model that includes embedded analysis software as well as requirements and information related to data manipulation and transfer. This paper describes the progress to date, and the application of the Virtual Mission to not only Constellation but to other architectures, and the pertinence to other aerospace applications. Vdot s intuitive visual interface brings VMs to life by turning static, paper-based processes into active, electronic processes that can be deployed, executed, managed, verified, and continuously improved. A VM can be executed using a computer-based, human-in-the-loop, real-time format, under the direction and control of the NASA VM Manager. Engineers in the various disciplines will not have to be Vdot-proficient but rather can fill out on-line, Excel-type databases with the mission information discussed above. The author s tool suite converts this database into several process visualization tools for review and into Microsoft Project, which can be imported directly into Vdot. Many tools can be embedded directly into Vdot, and when the necessary data/information is received from a preceding task, the analysis can be initiated automatically. Other NASA analysis tools are too complex for this process but Vdot automatically notifies the tool user that the data has been received and analysis can begin. The VM can be simulated from end-to-end using the author s tool suite. The planned approach for the Vdot-based process simulation is to generate the process model from a database; other advantages of this semi-automated approach are the participants can be geographically remote and after refining the process models via the human-in-the-loop simulation, the system can evolve into a process management server for the actual process.
Informed public choices for low-carbon electricity portfolios using a computer decision tool.
Mayer, Lauren A Fleishman; Bruine de Bruin, Wändi; Morgan, M Granger
2014-04-01
Reducing CO2 emissions from the electricity sector will likely require policies that encourage the widespread deployment of a diverse mix of low-carbon electricity generation technologies. Public discourse informs such policies. To make informed decisions and to productively engage in public discourse, citizens need to understand the trade-offs between electricity technologies proposed for widespread deployment. Building on previous paper-and-pencil studies, we developed a computer tool that aimed to help nonexperts make informed decisions about the challenges faced in achieving a low-carbon energy future. We report on an initial usability study of this interactive computer tool. After providing participants with comparative and balanced information about 10 electricity technologies, we asked them to design a low-carbon electricity portfolio. Participants used the interactive computer tool, which constrained portfolio designs to be realistic and yield low CO2 emissions. As they changed their portfolios, the tool updated information about projected CO2 emissions, electricity costs, and specific environmental impacts. As in the previous paper-and-pencil studies, most participants designed diverse portfolios that included energy efficiency, nuclear, coal with carbon capture and sequestration, natural gas, and wind. Our results suggest that participants understood the tool and used it consistently. The tool may be downloaded from http://cedmcenter.org/tools-for-cedm/informing-the-public-about-low-carbon-technologies/ .
NASA Technical Reports Server (NTRS)
1979-01-01
A plan is presented for the evolutionary development and deployment of the power module system with performance capabilities required to support the 1983 to 1990 user requirements. Aspects summarized include program functional, operational, and hardware elements; program work breakdown and specification items; development plans and schedules for developmental and technology milestones; test concepts and timeliness; and ground and orbit operations concepts.
NASA Astrophysics Data System (ADS)
Parker, Tim; Devanney, Peter; Bainbridge, Geoff; Townsend, Bruce
2017-04-01
The march to make every type of seismometer, weak to strong motion, reliable and economically deployable in any terrestrial environment continues with the availability of three new sensors and seismic systems including ones with over 200dB of dynamic range. Until recently there were probably 100 pier type broadband sensors for every observatory type pier, not the types of deployments geoscientists are needing to advance science and monitoring capability. Deeper boreholes are now the recognized quieter environments for best observatory class instruments and these same instruments can now be deployed in direct burial environments which is unprecedented. The experiences of facilities in large deployments of broadband seismometers in continental scale rolling arrays proves the utility of packaging new sensors in corrosion resistant casings and designing in the robustness needed to work reliably in temporary deployments. Integrating digitizers and other sensors decreases deployment complexity, decreases acquisition and deployment costs, increases reliability and utility. We'll discuss the informed evolution of broadband pier instruments into the modern integrated field tools that enable economic densification of monitoring arrays along with supporting new ways to approach geoscience research in a field environment.
The Way Point Planning Tool: Real Time Flight Planning for Airborne Science
NASA Technical Reports Server (NTRS)
He, Yubin; Blakeslee, Richard; Goodman, Michael; Hall, John
2012-01-01
Airborne real time observation are a major component of NASA's Earth Science research and satellite ground validation studies. For mission scientist, planning a research aircraft mission within the context of meeting the science objective is a complex task because it requires real time situational awareness of the weather conditions that affect the aircraft track. Multiple aircraft are often involved in the NASA field campaigns the coordination of the aircraft with satellite overpasses, other airplanes and the constantly evolving dynamic weather conditions often determine the success of the campaign. A flight planning tool is needed to provide situational awareness information to the mission scientist and help them plan and modify the flight tracks successfully. Scientists at the University of Alabama Huntsville and the NASA Marshal Space Flight Center developed the Waypoint Planning Tool (WPT), an interactive software tool that enables scientist to develop their own flight plans (also known as waypoints), with point and click mouse capabilities on a digital map filled with time raster and vector data. The development of this Waypoint Planning Tool demonstrates the significance of mission support in responding to the challenges presented during NASA field campaigns. Analyses during and after each campaign helped identify both issues and new requirements, initiating the next wave of development. Currently the Waypoint Planning Tool has gone through three rounds of development and analysis processes. The development of this waypoint tool is directly affected by the technology advances on GIS/Mapping technologies. From the standalone Google Earth application and simple KML functionalities to the Google Earth Plugin and Java Web Start/Applet on web platform, as well as to the rising open source GIS tools with new JavaScript frameworks, the Waypoint planning Tool has entered its third phase of technology advancement. The newly innovated, cross-platform, modular designed JavaScript-controled Waypoint tool is planned to be integrated with the NASA Airborne Science Mission Tool Suite. Adapting new technologies for the Waypoint Planning Tool ensures its success in helping scientist reach their mission objectives. This presentation will discuss the development process of the Waypoint Planning Tool in responding to field campaign challenges, identifying new information technologies, and describing the capabilities and features of the Waypoint Planning Tool with the real time aspect, interactive nature, and the resultant benefits to the airborne science community.
Characterizing health plan price estimator tools: findings from a national survey.
Higgins, Aparna; Brainard, Nicole; Veselovskiy, German
2016-02-01
Policy makers have growing interest in price transparency and in the kinds of tools available to consumers. Health plans have implemented price estimator tools that make provider pricing information available to members; however, systematic data on prevalence and characteristics of such tools are limited. The purpose of this study was to describe the characteristics of price estimator tools offered by health plans to their members and to identify potential trends, challenges, and opportunities for advancing the utility of these tools. National Web-based survey. Between 2014 and 2015, we conducted a national Web-based survey of health plans with commercial enrollment (100 plans, 43% response rate). Descriptive analyses were conducted using survey data. Health plan members have access to a variety of price estimator tool capabilities for commonly used procedures. These tools take into account member characteristics, including member zip code and benefit design. Despite outreach to members, however, challenges remain with respect to member uptake of such tools. Our study found that health plans share price and provider performance data with their members.
Wong, Charlene A; Kulhari, Sajal; McGeoch, Ellen J; Jones, Arthur T; Weiner, Janet; Polsky, Daniel; Baker, Tom
2018-05-29
The design of the Affordable Care Act's (ACA) health insurance marketplaces influences complex health plan choices. To compare the choice environments of the public health insurance exchanges in the fourth (OEP4) versus third (OEP3) open enrollment period and to examine online marketplace run by private companies, including a total cost estimate comparison. In November-December 2016, we examined the public and private online health insurance exchanges. We navigated each site for "real-shopping" (personal information required) and "window-shopping" (no required personal information). Public (n = 13; 12 state-based marketplaces and HealthCare.gov ) and private (n = 23) online health insurance exchanges. Features included consumer decision aids (e.g., total cost estimators, provider lookups) and plan display (e.g., order of plans). We examined private health insurance exchanges for notable features (i.e., those not found on public exchanges) and compared the total cost estimates on public versus private exchanges for a standardized consumer. Nearly all studied consumer decision aids saw increased deployment in the public marketplaces in OEP4 compared to OEP3. Over half of the public exchanges (n = 7 of 13) had total cost estimators (versus 5 of 14 in OEP3) in window-shopping and integrated provider lookups (window-shopping: 7; real-shopping: 8). The most common default plan orders were by premium or total cost estimate. Notable features on private health insurance exchanges were unique data presentation (e.g., infographics) and further personalized shopping (e.g., recommended plan flags). Health plan total cost estimates varied substantially between the public and private exchanges (average difference $1526). The ACA's public health insurance exchanges offered more tools in OEP4 to help consumers select a plan. While private health insurance exchanges presented notable features, the total cost estimates for a standardized consumer varied widely on public versus private exchanges.
Using diurnal temperature signals to infer vertical groundwater-surface water exchange
Irvine, Dylan J.; Briggs, Martin A.; Lautz, Laura K.; Gordon, Ryan P.; McKenzie, Jeffrey M.; Cartwright, Ian
2017-01-01
Heat is a powerful tracer to quantify fluid exchange between surface water and groundwater. Temperature time series can be used to estimate pore water fluid flux, and techniques can be employed to extend these estimates to produce detailed plan-view flux maps. Key advantages of heat tracing include cost-effective sensors and ease of data collection and interpretation, without the need for expensive and time-consuming laboratory analyses or induced tracers. While the collection of temperature data in saturated sediments is relatively straightforward, several factors influence the reliability of flux estimates that are based on time series analysis (diurnal signals) of recorded temperatures. Sensor resolution and deployment are particularly important in obtaining robust flux estimates in upwelling conditions. Also, processing temperature time series data involves a sequence of complex steps, including filtering temperature signals, selection of appropriate thermal parameters, and selection of the optimal analytical solution for modeling. This review provides a synthesis of heat tracing using diurnal temperature oscillations, including details on optimal sensor selection and deployment, data processing, model parameterization, and an overview of computing tools available. Recent advances in diurnal temperature methods also provide the opportunity to determine local saturated thermal diffusivity, which can improve the accuracy of fluid flux modeling and sensor spacing, which is related to streambed scour and deposition. These parameters can also be used to determine the reliability of flux estimates from the use of heat as a tracer.
Developing, deploying and reflecting on a web-based geologic simulation tool
NASA Astrophysics Data System (ADS)
Cockett, R.
2015-12-01
Geoscience is visual. It requires geoscientists to think and communicate about processes and events in three spatial dimensions and variations through time. This is hard(!), and students often have difficulty when learning and visualizing the three dimensional and temporal concepts. Visible Geology is an online geologic block modelling tool that is targeted at students in introductory and structural geology. With Visible Geology, students are able to combine geologic events in any order to create their own geologic models and ask 'what-if' questions, as well as interrogate their models using cross sections, boreholes and depth slices. Instructors use it as a simulation and communication tool in demonstrations, and students use it to explore concepts of relative geologic time, structural relationships, as well as visualize abstract geologic representations such as stereonets. The level of interactivity and creativity inherent in Visible Geology often results in a sense of ownership and encourages engagement, leading learners to practice visualization and interpretation skills and discover geologic relationships. Through its development over the last five years, Visible Geology has been used by over 300K students worldwide as well as in multiple targeted studies at the University of Calgary and at the University of British Columbia. The ease of use of the software has made this tool practical for deployment in classrooms of any size as well as for individual use. In this presentation, I will discuss the thoughts behind the implementation and layout of the tool, including a framework used for the development and design of new educational simulations. I will also share some of the surprising and unexpected observations on student interaction with the 3D visualizations, and other insights that are enabled by web-based development and deployment.
Patient-specific dosimetric endpoints based treatment plan quality control in radiotherapy.
Song, Ting; Staub, David; Chen, Mingli; Lu, Weiguo; Tian, Zhen; Jia, Xun; Li, Yongbao; Zhou, Linghong; Jiang, Steve B; Gu, Xuejun
2015-11-07
In intensity modulated radiotherapy (IMRT), the optimal plan for each patient is specific due to unique patient anatomy. To achieve such a plan, patient-specific dosimetric goals reflecting each patient's unique anatomy should be defined and adopted in the treatment planning procedure for plan quality control. This study is to develop such a personalized treatment plan quality control tool by predicting patient-specific dosimetric endpoints (DEs). The incorporation of patient specific DEs is realized by a multi-OAR geometry-dosimetry model, capable of predicting optimal DEs based on the individual patient's geometry. The overall quality of a treatment plan is then judged with a numerical treatment plan quality indicator and characterized as optimal or suboptimal. Taking advantage of clinically available prostate volumetric modulated arc therapy (VMAT) treatment plans, we built and evaluated our proposed plan quality control tool. Using our developed tool, six of twenty evaluated plans were identified as sub-optimal plans. After plan re-optimization, these suboptimal plans achieved better OAR dose sparing without sacrificing the PTV coverage, and the dosimetric endpoints of the re-optimized plans agreed well with the model predicted values, which validate the predictability of the proposed tool. In conclusion, the developed tool is able to accurately predict optimally achievable DEs of multiple OARs, identify suboptimal plans, and guide plan optimization. It is a useful tool for achieving patient-specific treatment plan quality control.
Saleem, Jason J; Savoy, April; Etherton, Gale; Herout, Jennifer
2018-02-01
The Veterans Health Administration (VHA) has deployed a large number of tablet computers in the last several years. However, little is known about how clinicians may use these devices with a newly planned Web-based electronic health record (EHR), as well as other clinical tools. The objective of this study was to understand the types of use that can be expected of tablet computers versus desktops. Semi-structured interviews were conducted with 24 clinicians at a Veterans Health Administration (VHA) Medical Center. An inductive qualitative analysis resulted in findings organized around recurrent themes of: (1) Barriers, (2) Facilitators, (3) Current Use, (4) Anticipated Use, (5) Patient Interaction, and (6) Connection. Our study generated several recommendations for the use of tablet computers with new health information technology tools being developed. Continuous connectivity for the mobile device is essential to avoid interruptions and clinician frustration. Also, making a physical keyboard available as an option for the tablet was a clear desire from the clinicians. Larger tablets (e.g., regular size iPad as compared to an iPad mini) were preferred. Being able to use secure messaging tools with the tablet computer was another consistent finding. Finally, more simplicity is needed for accessing patient data on mobile devices, while balancing the important need for adequate security. Published by Elsevier B.V.
49 CFR Appendix A to Part 194 - Guidelines for the Preparation of Response Plans
Code of Federal Regulations, 2010 CFR
2010-10-01
...) Oil spill removal organization field equipment deployment drills conducted yearly. (5) A drill that... PLANS FOR ONSHORE OIL PIPELINES Pt. 194, App. A Appendix A to Part 194—Guidelines for the Preparation of... substantial harm to the environment; (4) A list of line sections contained in the response zone, identified by...
49 CFR Appendix A to Part 194 - Guidelines for the Preparation of Response Plans
Code of Federal Regulations, 2012 CFR
2012-10-01
...) Oil spill removal organization field equipment deployment drills conducted yearly. (5) A drill that... PLANS FOR ONSHORE OIL PIPELINES Pt. 194, App. A Appendix A to Part 194—Guidelines for the Preparation of... substantial harm to the environment; (4) A list of line sections contained in the response zone, identified by...
49 CFR Appendix A to Part 194 - Guidelines for the Preparation of Response Plans
Code of Federal Regulations, 2013 CFR
2013-10-01
...) Oil spill removal organization field equipment deployment drills conducted yearly. (5) A drill that... PLANS FOR ONSHORE OIL PIPELINES Pt. 194, App. A Appendix A to Part 194—Guidelines for the Preparation of... substantial harm to the environment; (4) A list of line sections contained in the response zone, identified by...
49 CFR Appendix A to Part 194 - Guidelines for the Preparation of Response Plans
Code of Federal Regulations, 2014 CFR
2014-10-01
...) Oil spill removal organization field equipment deployment drills conducted yearly. (5) A drill that... PLANS FOR ONSHORE OIL PIPELINES Pt. 194, App. A Appendix A to Part 194—Guidelines for the Preparation of... substantial harm to the environment; (4) A list of line sections contained in the response zone, identified by...
49 CFR Appendix A to Part 194 - Guidelines for the Preparation of Response Plans
Code of Federal Regulations, 2011 CFR
2011-10-01
...) Oil spill removal organization field equipment deployment drills conducted yearly. (5) A drill that... PLANS FOR ONSHORE OIL PIPELINES Pt. 194, App. A Appendix A to Part 194—Guidelines for the Preparation of... substantial harm to the environment; (4) A list of line sections contained in the response zone, identified by...
Renewable Energy Deployment in Colorado and the West: A Modeling Sensitivity and GIS Analysis
DOE Office of Scientific and Technical Information (OSTI.GOV)
Barrows, Clayton; Mai, Trieu; Haase, Scott
2016-03-01
The Resource Planning Model is a capacity expansion model designed for a regional power system, such as a utility service territory, state, or balancing authority. We apply a geospatial analysis to Resource Planning Model renewable energy capacity expansion results to understand the likelihood of renewable development on various lands within Colorado.
Federal Register 2010, 2011, 2012, 2013, 2014
2010-06-09
... economies of scale and other cost saving measures for deployments that are already planned. In addition, Petitioners could benefit from the announced plans of some commercial carriers to begin construction of LTE... an open platform for development and testing of public safety 700 MHz LTE broadband equipment. This...
Deployment of Analytics into the Healthcare Safety Net: Lessons Learned.
Hartzband, David; Jacobs, Feygele
2016-01-01
As payment reforms shift healthcare reimbursement toward value-based payment programs, providers need the capability to work with data of greater complexity, scope and scale. This will in many instances necessitate a change in understanding of the value of data, and the types of data needed for analysis to support operations and clinical practice. It will also require the deployment of different infrastructure and analytic tools. Community health centers, which serve more than 25 million people and together form the nation's largest single source of primary care for medically underserved communities and populations, are expanding and will need to optimize their capacity to leverage data as new payer and organizational models emerge. To better understand existing capacity and help organizations plan for the strategic and expanded uses of data, a project was initiated that deployed contemporary, Hadoop-based, analytic technology into several multi-site community health centers (CHCs) and a primary care association (PCA) with an affiliated data warehouse supporting health centers across the state. An initial data quality exercise was carried out after deployment, in which a number of analytic queries were executed using both the existing electronic health record (EHR) applications and in parallel, the analytic stack. Each organization carried out the EHR analysis using the definitions typically applied for routine reporting. The analysis deploying the analytic stack was carried out using those common definitions established for the Uniform Data System (UDS) by the Health Resources and Service Administration. 1 In addition, interviews with health center leadership and staff were completed to understand the context for the findings. The analysis uncovered many challenges and inconsistencies with respect to the definition of core terms (patient, encounter, etc.), data formatting, and missing, incorrect and unavailable data. At a population level, apparent underreporting of a number of diagnoses, specifically obesity and heart disease, was also evident in the results of the data quality exercise, for both the EHR-derived and stack analytic results. Data awareness, that is, an appreciation of the importance of data integrity, data hygiene 2 and the potential uses of data, needs to be prioritized and developed by health centers and other healthcare organizations if analytics are to be used in an effective manner to support strategic objectives. While this analysis was conducted exclusively with community health center organizations, its conclusions and recommendations may be more broadly applicable.
Deployment of Analytics into the Healthcare Safety Net: Lessons Learned
Hartzband, David; Jacobs, Feygele
2016-01-01
Background As payment reforms shift healthcare reimbursement toward value-based payment programs, providers need the capability to work with data of greater complexity, scope and scale. This will in many instances necessitate a change in understanding of the value of data, and the types of data needed for analysis to support operations and clinical practice. It will also require the deployment of different infrastructure and analytic tools. Community health centers, which serve more than 25 million people and together form the nation’s largest single source of primary care for medically underserved communities and populations, are expanding and will need to optimize their capacity to leverage data as new payer and organizational models emerge. Methods To better understand existing capacity and help organizations plan for the strategic and expanded uses of data, a project was initiated that deployed contemporary, Hadoop-based, analytic technology into several multi-site community health centers (CHCs) and a primary care association (PCA) with an affiliated data warehouse supporting health centers across the state. An initial data quality exercise was carried out after deployment, in which a number of analytic queries were executed using both the existing electronic health record (EHR) applications and in parallel, the analytic stack. Each organization carried out the EHR analysis using the definitions typically applied for routine reporting. The analysis deploying the analytic stack was carried out using those common definitions established for the Uniform Data System (UDS) by the Health Resources and Service Administration.1 In addition, interviews with health center leadership and staff were completed to understand the context for the findings. Results The analysis uncovered many challenges and inconsistencies with respect to the definition of core terms (patient, encounter, etc.), data formatting, and missing, incorrect and unavailable data. At a population level, apparent underreporting of a number of diagnoses, specifically obesity and heart disease, was also evident in the results of the data quality exercise, for both the EHR-derived and stack analytic results. Conclusion Data awareness, that is, an appreciation of the importance of data integrity, data hygiene2 and the potential uses of data, needs to be prioritized and developed by health centers and other healthcare organizations if analytics are to be used in an effective manner to support strategic objectives. While this analysis was conducted exclusively with community health center organizations, its conclusions and recommendations may be more broadly applicable. PMID:28210424
2017-06-01
importantly, it examines the methodology used to build the class IX block embarked on ship prior to deployment. The class IX block is defined as a repository...compared to historical data to evaluate model and simulation outputs. This thesis provides recommendations on improving the methodology implemented in...improving the level of organic support available to deployed units. More importantly, it examines the methodology used to build the class IX block
Global Demands: Limited Forces. US Army Deployment
1984-01-01
will remain a perennial problem . The administration does not want to provide potential adver- saries with details of national strategy. Nor do the...deployments ana tactical operations exacerbate this shortfall. In a crisis, the national command authorities will be faced with a serious problem , choosing be...the planned usa of available Arm combat forces to maxium their 00oWta i the most crii" theats. The nation will hae to deal w1th this shortfall i
1997-09-30
field experiments in Puget Sound . Each research vessel will use multi- sensor profiling instrument packages which obtain high-resolution physical...field deployment of the wireless network is planned for May-July, 1998, at Orcas Island, WA. IMPACT We expect that wireless communication systems will...East Sound project to be a first step toward continental shelf and open ocean deployments with the next generation of wireless and satellite
Cross-platform validation and analysis environment for particle physics
DOE Office of Scientific and Technical Information (OSTI.GOV)
Chekanov, S. V.; Pogrebnyak, I.; Wilbern, D.
A multi-platform validation and analysis framework for public Monte Carlo simulation for high-energy particle collisions is discussed. The front-end of this framework uses the Python programming language, while the back-end is written in Java, which provides a multi-platform environment that can be run from a web browser and can easily be deployed at the grid sites. The analysis package includes all major software tools used in high-energy physics, such as Lorentz vectors, jet algorithms, histogram packages, graphic canvases, and tools for providing data access. This multi-platform software suite, designed to minimize OS-specific maintenance and deployment time, is used for onlinemore » validation of Monte Carlo event samples through a web interface.« less
Decoupled 1D/3D analysis of a hydraulic valve
NASA Astrophysics Data System (ADS)
Mehring, Carsten; Zopeya, Ashok; Latham, Matt; Ihde, Thomas; Massie, Dan
2014-10-01
Analysis approaches during product development of fluid valves and other aircraft fluid delivery components vary greatly depending on the development stage. Traditionally, empirical or simplistic one-dimensional tools are being deployed during preliminary design, whereas detailed analysis such as CFD (Computational Fluid Dynamics) tools are used to refine a selected design during the detailed design stage. In recent years, combined 1D/3D co-simulation has been deployed specifically for system level simulations requiring an increased level of analysis detail for one or more components. The present paper presents a decoupled 1D/3D analysis approach where 3D CFD analysis results are utilized to enhance the fidelity of a dynamic 1D modelin context of an aircraft fuel valve.
E-beam column monitoring for improved CD SEM stability and tool matching
NASA Astrophysics Data System (ADS)
Hayes, Timothy S.; Henninger, Randall S.
2000-06-01
Tool matching is an important metric for in-line semiconductor metrology systems. The ability to obtain the same measurement results on two or more systems allows a semiconductor fabrication facility (fab) to deploy product in an efficient manner improving overall equipment efficiency (OEE). Many parameters on the critical dimension scanning electron microscopes (CDSEMs) can affect the long-term precision component to the tool-matching metric. One such class of parameters is related to the electron beam column stability. The alignment and condition of the gun and apertures, as well as astigmatism correction, have all been found to affect the overall measurements of the CDSEM. These effects are now becoming dominant factors in sub-3nm tool-matching criteria. This paper discusses the methodologies of column parameter monitoring and actions and controls for improving overall stability. Results have shown that column instabilities caused by contamination, gun fluctuations, component failures, detector efficiency, and external issues can be identified through parameter monitoring. The Applied Materials (AMAT) 7830 Series CDSEMs evaluated at IBM's Burlington, Vermont manufacturing facility have demonstrated 5 nm tool matching across 11 systems, which has resulted in non-dedicated product deployment and has significantly reduced cost of ownership.
Chapter 8: Planning Tools to Simulate and Optimize Neighborhood Energy Systems
DOE Office of Scientific and Technical Information (OSTI.GOV)
Zhivov, Alexander Michael; Case, Michael Patrick; Jank, Reinhard
This section introduces different energy modeling tools available in Europe and the USA for community energy master planning process varying from strategic Urban Energy Planning to more detailed Local Energy Planning. Two modeling tools used for Energy Master Planning of primarily residential communities, the 3D city model with CityGML, and the Net Zero Planner tool developed for the US Department of Defense installations are described in more details.
Effects of Planning on Task Load, Knowledge, and Tool Preference: A Comparison of Two Tools
ERIC Educational Resources Information Center
Bonestroo, Wilco J.; de Jong, Ton
2012-01-01
Self-regulated learners are expected to plan their own learning. Because planning is a complex task, it is not self-evident that all learners can perform this task successfully. In this study, we examined the effects of two planning support tools on the quality of created plans, planning behavior, task load, and acquired knowledge. Sixty-five…
The Adaptable, Deployable Entry and Placement Technology (ADEPT)
NASA Technical Reports Server (NTRS)
Wercinski, Paul
2017-01-01
The initial system-level development of the nano-ADEPT architecture will culminate in the launch of a 0.7 meter deployed diameter ADEPT sounding rocket flight experiment named, SR-1. Launch is planned for August 2017. The test will utilize the NASA Flight Opportunities Program sounding rocket platform provided by UP Aerospace to launch SR-1 to an apogee over 100 km and achieve re-entry conditions with a peak velocity near Mach 3. The SR-1 flight experiment will demonstrate most of the primary end-to-end mission stages including: launch in a stowed configuration, separation and deployment in exo-atmospheric conditions, and passive ballistic re-entry of a 70-degree half-angle faceted cone geometry.
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1998-08-01
An estimated 85% of the installed base of software is a custom application with a production quantity of one. In practice, almost 100% of military software systems are custom software. Paradoxically, the marginal costs of producing additional units are near zero. So why hasn`t the software market, a market with high design costs and low productions costs evolved like other similar custom widget industries, such as automobiles and hardware chips? The military software industry seems immune to market pressures that have motivated a multilevel supply chain structure in other widget industries: design cost recovery, improve quality through specialization, and enablemore » rapid assembly from purchased components. The primary goal of the ComponentWare Consortium (CWC) technology plan was to overcome barriers to building and deploying mission-critical information systems by using verified, reusable software components (Component Ware). The adoption of the ComponentWare infrastructure is predicated upon a critical mass of the leading platform vendors` inevitable adoption of adopting emerging, object-based, distributed computing frameworks--initially CORBA and COM/OLE. The long-range goal of this work is to build and deploy military systems from verified reusable architectures. The promise of component-based applications is to enable developers to snap together new applications by mixing and matching prefabricated software components. A key result of this effort is the concept of reusable software architectures. A second important contribution is the notion that a software architecture is something that can be captured in a formal language and reused across multiple applications. The formalization and reuse of software architectures provide major cost and schedule improvements. The Unified Modeling Language (UML) is fast becoming the industry standard for object-oriented analysis and design notation for object-based systems. However, the lack of a standard real-time distributed object operating system, lack of a standard Computer-Aided Software Environment (CASE) tool notation and lack of a standard CASE tool repository has limited the realization of component software. The approach to fulfilling this need is the software component factory innovation. The factory approach takes advantage of emerging standards such as UML, CORBA, Java and the Internet. The key technical innovation of the software component factory is the ability to assemble and test new system configurations as well as assemble new tools on demand from existing tools and architecture design repositories.« less
Development of Waypoint Planning Tool in Response to NASA Field Campaign Challenges
NASA Technical Reports Server (NTRS)
He, Matt; Hardin, Danny; Conover, Helen; Graves, Sara; Meyer, Paul; Blakeslee, Richard; Goodman, Michael
2012-01-01
Airborne real time observations are a major component of NASA's Earth Science research and satellite ground validation studies. For mission scientists, planning a research aircraft mission within the context of meeting the science objectives is a complex task because it requires real time situational awareness of the weather conditions that affect the aircraft track. Multiple aircrafts are often involved in NASA field campaigns. The coordination of the aircrafts with satellite overpasses, other airplanes and the constantly evolving, dynamic weather conditions often determines the success of the campaign. A flight planning tool is needed to provide situational awareness information to the mission scientists, and help them plan and modify the flight tracks. Scientists at the University of Alabama-Huntsville and the NASA Marshall Space Flight Center developed the Waypoint Planning Tool, an interactive software tool that enables scientists to develop their own flight plans (also known as waypoints) with point -and-click mouse capabilities on a digital map filled with real time raster and vector data. The development of this Waypoint Planning Tool demonstrates the significance of mission support in responding to the challenges presented during NASA field campaigns. Analysis during and after each campaign helped identify both issues and new requirements, and initiated the next wave of development. Currently the Waypoint Planning Tool has gone through three rounds of development and analysis processes. The development of this waypoint tool is directly affected by the technology advances on GIS/Mapping technologies. From the standalone Google Earth application and simple KML functionalities, to Google Earth Plugin and Java Web Start/Applet on web platform, and to the rising open source GIS tools with new JavaScript frameworks, the Waypoint Planning Tool has entered its third phase of technology advancement. The newly innovated, cross ]platform, modular designed JavaScript ]controlled Way Point Tool is planned to be integrated with NASA Airborne Science Mission Tool Suite. Adapting new technologies for the Waypoint Planning Tool ensures its success in helping scientists reach their mission objectives. This presentation will discuss the development processes of the Waypoint Planning Tool in responding to field campaign challenges, identify new information technologies, and describe the capabilities and features of the Waypoint Planning Tool with the real time aspect, interactive nature, and the resultant benefits to the airborne science community.
Development of Way Point Planning Tool in Response to NASA Field Campaign Challenges
NASA Astrophysics Data System (ADS)
He, M.; Hardin, D. M.; Conover, H.; Graves, S. J.; Meyer, P.; Blakeslee, R. J.; Goodman, M. L.
2012-12-01
Airborne real time observations are a major component of NASA's Earth Science research and satellite ground validation studies. For mission scientists, planning a research aircraft mission within the context of meeting the science objectives is a complex task because it requires real time situational awareness of the weather conditions that affect the aircraft track. Multiple aircrafts are often involved in NASA field campaigns. The coordination of the aircrafts with satellite overpasses, other airplanes and the constantly evolving, dynamic weather conditions often determines the success of the campaign. A flight planning tool is needed to provide situational awareness information to the mission scientists, and help them plan and modify the flight tracks. Scientists at the University of Alabama-Huntsville and the NASA Marshall Space Flight Center developed the Waypoint Planning Tool, an interactive software tool that enables scientists to develop their own flight plans (also known as waypoints) with point-and-click mouse capabilities on a digital map filled with real time raster and vector data. The development of this Waypoint Planning Tool demonstrates the significance of mission support in responding to the challenges presented during NASA field campaigns. Analysis during and after each campaign helped identify both issues and new requirements, and initiated the next wave of development. Currently the Waypoint Planning Tool has gone through three rounds of development and analysis processes. The development of this waypoint tool is directly affected by the technology advances on GIS/Mapping technologies. From the standalone Google Earth application and simple KML functionalities, to Google Earth Plugin and Java Web Start/Applet on web platform, and to the rising open source GIS tools with new JavaScript frameworks, the Waypoint Planning Tool has entered its third phase of technology advancement. The newly innovated, cross-platform, modular designed JavaScript-controlled Way Point Tool is planned to be integrated with NASA Airborne Science Mission Tool Suite. Adapting new technologies for the Waypoint Planning Tool ensures its success in helping scientists reach their mission objectives. This presentation will discuss the development processes of the Waypoint Planning Tool in responding to field campaign challenges, identify new information technologies, and describe the capabilities and features of the Waypoint Planning Tool with the real time aspect, interactive nature, and the resultant benefits to the airborne science community.
Payne, Jennifer I; Dunbar, Margaret J; Talbot, Pamela; Tan, Meng H
2018-06-01
The Diabetes Care Program of Nova Scotia (DCPNS)'s mission is "to improve, through leadership and partnerships, the health of Nova Scotians living with, affected by, or at risk of developing diabetes." Working together with local, provincial and national partners, the DCPNS has improved and standardized diabetes care in Nova Scotia over the past 25 years by developing and deploying a resourceful and collaborative program model. This article describes the model and highlights its key achievements. With balanced representation from frontline providers through to senior decision makers in health care, the DCPNS works across the age continuum, supporting the implementation of national clinical practice guidelines and, when necessary, developing provincial guidelines to meet local needs. The development and implementation of standardized documentation and data collection tools in all diabetes centres created a robust opportunity for the development and expansion of the DCPNS registry. This registry provides useful clinical and statistical information to staff, providers within the circle of care, management and senior leadership. Data are used to support individual care, program planning, quality improvement and business planning at both the local and the provincial levels. The DCPNS supports the sharing of new knowledge and advances through continuous education for providers. The DCPNS's ability to engage diabetes educators and key physician champions has ensured balanced perspectives in the creation of tools and resources that can be effective in real-world practice. The DCPNS has evolved to become an illustrative example of the chronic care model in action. Copyright © 2017 Diabetes Canada. Published by Elsevier Inc. All rights reserved.
NASA Astrophysics Data System (ADS)
Anizar; Siregar, I.; Yahya, I.; Yesika, N.
2018-02-01
The activity of lowering fresh fruit bunches (FFB) from truck to sorting floor is performed manually by workers using a sorting tool. Previously, the sorting tool used is a pointed iron bar with a T-shaped handle. Changes made to the sorting tool causes several complaints on worker and affect the time to lower the fruit. The purpose of this article is to obtain the design of an FFB sorting tool that suits the needs of these workers by applying the Quality Function Deployment (QFD) and Kano Model methods. Both of the two methods will be integrated to find the design that matches workers’ image and psychological feeling. The main parameters are to obtain the customer requirements of the palm fruit loading workers, to find the most important technical characteristics and critical part affecting the quality of the FFB sorting tool. The customer requirements of the palm loading workers are the following : the color of the coating paint is gray, the bar material is made of stainless pipe, the main grip coating material is made of grip, the tip material is made of the spring steel, the additional grip is made of rubber and the handle is of triangular shape.
ODM2 Admin Pilot Project- a Data Management Application for Observations of the Critical Zone.
NASA Astrophysics Data System (ADS)
Leon, M.; McDowell, W. H.; Mayorga, E.; Setiawan, L.; Hooper, R. P.
2017-12-01
ODM2 Admin is a tool to manage data stored in a relational database using the Observation Data Model 2 (ODM2) information model. Originally developed by the Luquillo Critical Zone Observatory (CZO) to manage a wide range of Earth observations, it has now been deployed at 6 projects: the Catalina Jemez CZO, the Dry Creek Experimental Forest, Au Sable and Manistee River sites managed by Michigan State, Tropical Response to Altered Climate Experiment (TRACE) and the Critical Zone Integrative Microbial Ecology Activity (CZIMEA) EarthCube project; most of these deployments are hosted on a Microsoft Azure cloud server managed by CUAHSI. ODM2 Admin is a web application built on the Python open-source Django framework and available for download from GitHub and DockerHub. It provides tools for data ingestion, editing, QA/QC, data visualization, browsing, mapping and documentation of equipment deployment, methods, and citations. Additional features include the ability to generate derived data values, automatically or manually create data annotations and create datasets from arbitrary groupings of results. Over 22 million time series values for more than 600 time series are being managed with ODM2 Admin across the 6 projects as well as more than 12,000 soil profiles and other measurements. ODM2 Admin links with external identifier systems through DOIs, ORCiDs and IGSNs, so cited works, details about researchers and earth sample meta-data can be accessed directly from ODM2 Admin. This application is part of a growing open source ODM2 application ecosystem under active development. ODM2 Admin can be deployed alongside other tools from the ODM2 ecosystem, including ODM2API and WOFpy, which provide access to the underlying ODM2 data through a Python API and Water One Flow web services.
76 FR 45334 - Innovative Techniques for Delivering ITS Learning; Request for Information
Federal Register 2010, 2011, 2012, 2013, 2014
2011-07-28
... training opportunities and the desire to use emerging social media tools to better engage and collaborate...; Collaborative--through the use of social media or other `virtual' meeting spaces; Designed for the adult learner... ITS deployers? 6. How might social media collaboration tools be used to engage audiences in ITS...
Framework to parameterize and validate APEX to support deployment of the nutrient tracking tool
USDA-ARS?s Scientific Manuscript database
Guidelines have been developed to parameterize and validate the Agricultural Policy Environmental eXtender (APEX) to support the Nutrient Tracking Tool (NTT). This follow-up paper presents 1) a case study to illustrate how the developed guidelines are applied in a headwater watershed located in cent...
ERIC Educational Resources Information Center
Hoffman, Blaine
2013-01-01
This work focuses on the impact of mobile computing on individuals' perspectives of places within their community. A technological intervention is designed and deployed to augment the user experience of visiting different locations around town, physically exploring them while also interacting with an online tool. The tool-supported activity serves…
Poland, Michael P; Nugent, Chris D; Wang, Hui; Chen, Liming
2009-01-01
Smart Homes offer potential solutions for various forms of independent living for the elderly. The assistive and protective environment afforded by smart homes offer a safe, relatively inexpensive, dependable and viable alternative to vulnerable inhabitants. Nevertheless, the success of a smart home rests upon the quality of information its decision support system receives and this in turn places great importance on the issue of correct sensor deployment. In this article we present a software tool that has been developed to address the elusive issue of sensor distribution within smart homes. Details of the tool will be presented and it will be shown how it can be used to emulate any real world environment whereby virtual sensor distributions can be rapidly implemented and assessed without the requirement for physical deployment for evaluation. As such, this approach offers the potential of tailoring sensor distributions to the specific needs of a patient in a non-evasive manner. The heuristics based tool presented here has been developed as the first part of a three stage project.
Song, Ting; Li, Nan; Zarepisheh, Masoud; Li, Yongbao; Gautier, Quentin; Zhou, Linghong; Mell, Loren; Jiang, Steve; Cerviño, Laura
2016-01-01
Intensity-modulated radiation therapy (IMRT) currently plays an important role in radiotherapy, but its treatment plan quality can vary significantly among institutions and planners. Treatment plan quality control (QC) is a necessary component for individual clinics to ensure that patients receive treatments with high therapeutic gain ratios. The voxel-weighting factor-based plan re-optimization mechanism has been proved able to explore a larger Pareto surface (solution domain) and therefore increase the possibility of finding an optimal treatment plan. In this study, we incorporated additional modules into an in-house developed voxel weighting factor-based re-optimization algorithm, which was enhanced as a highly automated and accurate IMRT plan QC tool (TPS-QC tool). After importing an under-assessment plan, the TPS-QC tool was able to generate a QC report within 2 minutes. This QC report contains the plan quality determination as well as information supporting the determination. Finally, the IMRT plan quality can be controlled by approving quality-passed plans and replacing quality-failed plans using the TPS-QC tool. The feasibility and accuracy of the proposed TPS-QC tool were evaluated using 25 clinically approved cervical cancer patient IMRT plans and 5 manually created poor-quality IMRT plans. The results showed high consistency between the QC report quality determinations and the actual plan quality. In the 25 clinically approved cases that the TPS-QC tool identified as passed, a greater difference could be observed for dosimetric endpoints for organs at risk (OAR) than for planning target volume (PTV), implying that better dose sparing could be achieved in OAR than in PTV. In addition, the dose-volume histogram (DVH) curves of the TPS-QC tool re-optimized plans satisfied the dosimetric criteria more frequently than did the under-assessment plans. In addition, the criteria for unsatisfied dosimetric endpoints in the 5 poor-quality plans could typically be satisfied when the TPS-QC tool generated re-optimized plans without sacrificing other dosimetric endpoints. In addition to its feasibility and accuracy, the proposed TPS-QC tool is also user-friendly and easy to operate, both of which are necessary characteristics for clinical use. PMID:26930204
MAPGEN: Mixed-Initiative Activity Planning for the Mars Exploration Rover Mission
NASA Technical Reports Server (NTRS)
Ai-Chang, Mitchell; Bresina, John; Hsu, Jennifer; Jonsson, Ari; Kanefsky, Bob; McCurdy, Michael; Morris, Paul; Rajan, Kanna; Vera, Alonso; Yglesias, Jeffrey
2004-01-01
This document describes the Mixed initiative Activity Plan Generation system MAPGEN. This system is one of the critical tools in the Mars Exploration Rover mission surface operations, where it is used to build activity plans for each of the rovers, each Martian day. The MAPGEN system combines an existing tool for activity plan editing and resource modeling, with an advanced constraint-based reasoning and planning framework. The constraint-based planning component provides active constraint and rule enforcement, automated planning capabilities, and a variety of tools and functions that are useful for building activity plans in an interactive fashion. In this demonstration, we will show the capabilities of the system and demonstrate how the system has been used in actual Mars rover operations. In contrast to the demonstration given at ICAPS 03, significant improvement have been made to the system. These include various additional capabilities that are based on automated reasoning and planning techniques, as well as a new Constraint Editor support tool. The Constraint Editor (CE) as part of the process for generating these command loads, the MAPGEN tool provides engineers and scientists an intelligent activity planning tool that allows them to more effectively generate complex plans that maximize the science return each day. The key to the effectiveness of the MAPGEN tool is an underlying constraint-based planning and reasoning engine.
Cloud Environment Automation: from infrastructure deployment to application monitoring
NASA Astrophysics Data System (ADS)
Aiftimiei, C.; Costantini, A.; Bucchi, R.; Italiano, A.; Michelotto, D.; Panella, M.; Pergolesi, M.; Saletta, M.; Traldi, S.; Vistoli, C.; Zizzi, G.; Salomoni, D.
2017-10-01
The potential offered by the cloud paradigm is often limited by technical issues, rules and regulations. In particular, the activities related to the design and deployment of the Infrastructure as a Service (IaaS) cloud layer can be difficult to apply and time-consuming for the infrastructure maintainers. In this paper the research activity, carried out during the Open City Platform (OCP) research project [1], aimed at designing and developing an automatic tool for cloud-based IaaS deployment is presented. Open City Platform is an industrial research project funded by the Italian Ministry of University and Research (MIUR), started in 2014. It intends to research, develop and test new technological solutions open, interoperable and usable on-demand in the field of Cloud Computing, along with new sustainable organizational models that can be deployed for and adopted by the Public Administrations (PA). The presented work and the related outcomes are aimed at simplifying the deployment and maintenance of a complete IaaS cloud-based infrastructure.
Helping military families through the deployment process: Strategies to support parenting
Gewirtz, Abigail H.; Erbes, Christopher R.; Polusny, Melissa A.; Forgatch, Marion S.; DeGarmo, David S.
2011-01-01
Recent studies have highlighted the impact of deployment on military families and children and the corresponding need for interventions to support them. Historically, however, little emphasis has been placed on family-based interventions in general, and parenting interventions in particular, with returning service members. This paper provides an overview of research on the associations between combat deployment, parental adjustment of service members and spouses, parenting impairments, and children’s adjustment problems, and provides a social interaction learning framework for research and practice to support parenting among military families affected by a parent’s deployment. We then describe the Parent Management Training-Oregon model (PMTO™), a family of interventions that improves parenting practices and child adjustment in highly stressed families, and briefly present work on an adaptation of PMTO for use in military families (After Deployment: Adaptive Parenting Tools, or ADAPT). The article concludes with PMTO-based recommendations for clinicians providing parenting support to military families. PMID:21841889
Mao, XianQiang; Zhou, Ji; Corsetti, Gabriel
2014-09-02
This study evaluates how well China's 11th and 12th Five-Year Plans have been implemented in terms of energy conservation and air pollution control and deconstructs the effects of the economic, energy, and environmental policies included in the Plans. A "counterfactual" comparative-scenario method is deployed, which assumes a business as usual scenario in which the changes in economic, energy, and environmental parameters are "frozen", and then reactivates them one by one, with the help of LEAP modeling. It is found that during the 11th Five-Year Plan period, the binding targets were basically achieved. Economic growth put a great strain upon the energy demand and the environment, but energy policy made a decisive contribution by promoting energy efficiency and structure. Environmental policy promoted the deployment of end-of-pipe treatment which led to the control of certain air pollutants but at the expense of an increase in energy use and in the emission of other pollutants. During the ongoing 12th Five-Year Plan period, energy policy's potential for efficiency improvement is shrinking, but economic policy is restraining economic growth thus making a positive contribution. Environmental policy attempts to enforce multipollutant reduction, but there is still insufficient focus on the cocontrol of different pollutants and CO2.
Wireline system for multiple direct push tool usage
Bratton, Wesley L.; Farrington, Stephen P.; Shinn, II, James D.; Nolet, Darren C.
2003-11-11
A tool latching and retrieval system allows the deployment and retrieval of a variety of direct push subsurface characterization tools through an embedded rod string during a single penetration without requiring withdrawal of the string from the ground. This enables the in situ interchange of different tools, as well as the rapid retrieval of soil core samples from multiple depths during a single direct push penetration. The system includes specialized rods that make up the rod string, a tool housing which is integral to the rod string, a lock assembly, and several tools which mate to the lock assembly.
Diy Geospatial Web Service Chains: Geochaining Make it Easy
NASA Astrophysics Data System (ADS)
Wu, H.; You, L.; Gui, Z.
2011-08-01
It is a great challenge for beginners to create, deploy and utilize a Geospatial Web Service Chain (GWSC). People in Computer Science are usually not familiar with geospatial domain knowledge. Geospatial practitioners may lack the knowledge about web services and service chains. The end users may lack both. However, integrated visual editing interfaces, validation tools, and oneclick deployment wizards may help to lower the learning curve and improve modelling skills so beginners will have a better experience. GeoChaining is a GWSC modelling tool designed and developed based on these ideas. GeoChaining integrates visual editing, validation, deployment, execution etc. into a unified platform. By employing a Virtual Globe, users can intuitively visualize raw data and results produced by GeoChaining. All of these features allow users to easily start using GWSC, regardless of their professional background and computer skills. Further, GeoChaining supports GWSC model reuse, meaning that an entire GWSC model created or even a specific part can be directly reused in a new model. This greatly improves the efficiency of creating a new GWSC, and also contributes to the sharing and interoperability of GWSC.