Sample records for design construction testing

  1. 29 CFR 1926.1433 - Design, construction and testing.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 29 Labor 8 2013-07-01 2013-07-01 false Design, construction and testing. 1926.1433 Section 1926... Construction § 1926.1433 Design, construction and testing. The following requirements apply to equipment that... locomotive cranes manufactured prior to November 8, 2010 must meet the applicable requirements for design...

  2. 29 CFR 1926.1433 - Design, construction and testing.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 29 Labor 8 2014-07-01 2014-07-01 false Design, construction and testing. 1926.1433 Section 1926... Construction § 1926.1433 Design, construction and testing. The following requirements apply to equipment that... locomotive cranes manufactured prior to November 8, 2010 must meet the applicable requirements for design...

  3. 29 CFR 1926.1433 - Design, construction and testing.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 29 Labor 8 2011-07-01 2011-07-01 false Design, construction and testing. 1926.1433 Section 1926... Construction § 1926.1433 Design, construction and testing. The following requirements apply to equipment that... locomotive cranes manufactured prior to November 8, 2010 must meet the applicable requirements for design...

  4. 29 CFR 1926.1433 - Design, construction and testing.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 29 Labor 8 2012-07-01 2012-07-01 false Design, construction and testing. 1926.1433 Section 1926... Construction § 1926.1433 Design, construction and testing. The following requirements apply to equipment that... locomotive cranes manufactured prior to November 8, 2010 must meet the applicable requirements for design...

  5. Algorithms for the Construction of Parallel Tests by Zero-One Programming. Project Psychometric Aspects of Item Banking No. 7. Research Report 86-7.

    ERIC Educational Resources Information Center

    Boekkooi-Timminga, Ellen

    Nine methods for automated test construction are described. All are based on the concepts of information from item response theory. Two general kinds of methods for the construction of parallel tests are presented: (1) sequential test design; and (2) simultaneous test design. Sequential design implies that the tests are constructed one after the…

  6. 46 CFR 161.010-2 - Design, construction, and test requirements.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 6 2013-10-01 2013-10-01 false Design, construction, and test requirements. 161.010-2 Section 161.010-2 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) EQUIPMENT, CONSTRUCTION, AND MATERIALS: SPECIFICATIONS AND APPROVAL ELECTRICAL EQUIPMENT Floating Electric Waterlight § 161.010-2 Design, construction, and test...

  7. 46 CFR 161.010-2 - Design, construction, and test requirements.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 6 2010-10-01 2010-10-01 false Design, construction, and test requirements. 161.010-2 Section 161.010-2 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) EQUIPMENT, CONSTRUCTION, AND MATERIALS: SPECIFICATIONS AND APPROVAL ELECTRICAL EQUIPMENT Floating Electric Waterlight § 161.010-2 Design, construction, and test...

  8. 46 CFR 161.010-2 - Design, construction, and test requirements.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 6 2014-10-01 2014-10-01 false Design, construction, and test requirements. 161.010-2 Section 161.010-2 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) EQUIPMENT, CONSTRUCTION, AND MATERIALS: SPECIFICATIONS AND APPROVAL ELECTRICAL EQUIPMENT Floating Electric Waterlight § 161.010-2 Design, construction, and test...

  9. 46 CFR 161.010-2 - Design, construction, and test requirements.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 6 2011-10-01 2011-10-01 false Design, construction, and test requirements. 161.010-2 Section 161.010-2 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) EQUIPMENT, CONSTRUCTION, AND MATERIALS: SPECIFICATIONS AND APPROVAL ELECTRICAL EQUIPMENT Floating Electric Waterlight § 161.010-2 Design, construction, and test...

  10. Full-Scale Accelerated Testing of Multi-axial Geogrid Stabilized Flexible Pavements

    DTIC Science & Technology

    2017-06-01

    costs and reduced budgets, transportation officials are often tasked with applying innovative solutions to pavement design and construction projects... pavement designers . 1.2 Objective The objective of this effort was to construct and traffic full-scale flexible pavement sections to provide...Development Center (ERDC) constructed the full-scale test section as designed by Tensar under shelter in its Hangar 2 Pavement Test Facility. During

  11. Upcoming Purchasing and Subcontracting Opportunities | NREL

    Science.gov Websites

    Services Fall 2022 Construction@nrel.gov Design-Build and Construction Spring 2018 Construction@nrel.gov Design-Build for Minor Construction Spring 2020 Construction@nrel.gov Testing of Fuel and Oil Samples

  12. Construct and test scale model box culvert design project.

    DOT National Transportation Integrated Search

    2010-11-01

    The research team at the University of New Mexicos (UNM) hydraulics lab designed, constructed, and : tested a 1:20 scale physical model of a proposed culvert in Jemez Springs, New Mexico. The culvert : design was developed by the New Mexico Depart...

  13. 46 CFR 162.027-2 - Design, construction, testing and marking requirements.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 6 2011-10-01 2011-10-01 false Design, construction, testing and marking requirements. 162.027-2 Section 162.027-2 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) EQUIPMENT, CONSTRUCTION, AND MATERIALS: SPECIFICATIONS AND APPROVAL ENGINEERING EQUIPMENT Combination Solid Stream and Water Spray Firehose Nozzles §...

  14. 46 CFR 162.027-2 - Design, construction, testing and marking requirements.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 6 2014-10-01 2014-10-01 false Design, construction, testing and marking requirements. 162.027-2 Section 162.027-2 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) EQUIPMENT, CONSTRUCTION, AND MATERIALS: SPECIFICATIONS AND APPROVAL ENGINEERING EQUIPMENT Combination Solid Stream and Water Spray Firehose Nozzles §...

  15. 46 CFR 162.027-2 - Design, construction, testing and marking requirements.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 6 2013-10-01 2013-10-01 false Design, construction, testing and marking requirements. 162.027-2 Section 162.027-2 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) EQUIPMENT, CONSTRUCTION, AND MATERIALS: SPECIFICATIONS AND APPROVAL ENGINEERING EQUIPMENT Combination Solid Stream and Water Spray Firehose Nozzles §...

  16. Design and Construction of a Hydroturbine Test Facility

    NASA Astrophysics Data System (ADS)

    Ayli, Ece; Kavurmaci, Berat; Cetinturk, Huseyin; Kaplan, Alper; Celebioglu, Kutay; Aradag, Selin; Tascioglu, Yigit; ETU Hydro Research Center Team

    2014-11-01

    Hydropower is one of the clean, renewable, flexible and efficient energy resources. Most of the developing countries invest on this cost-effective energy source. Hydroturbines for hydroelectric power plants are tailor-made. Each turbine is designed and constructed according to the properties, namely the head and flow rate values of the specific water source. Therefore, a center (ETU Hydro-Center for Hydro Energy Research) for the design, manufacturing and performance tests of hydraulic turbines is established at TOBB University of Economics and Technology to promote research in this area. CFD aided hydraulic and structural design, geometry optimization, manufacturing and performance tests of hydraulic turbines are the areas of expertise of this center. In this paper, technical details of the design and construction of this one of a kind test facility in Turkey, is explained. All the necessary standards of IEC (International Electrotechnical Commission) are met since the test facility will act as a certificated test center for hydraulic turbines.

  17. Design and construction of a full-scale lateral impact testing facility.

    DOT National Transportation Integrated Search

    2015-05-01

    The goal of this work is to design and construct a full scale lateral impact testing facility that is capable of recreating the damage that would be created by an overheight vehicle collision. This was accomplished by impacting a test specimen with 8...

  18. Critical Variables in Singing Accuracy Test Construction: A Review of Literature

    ERIC Educational Resources Information Center

    Nichols, Bryan E.

    2016-01-01

    The purpose of this review of literature was to identify research findings for designing assessments in singing accuracy. The aim was to specify the test construction variables that directly affect test performance to guide future design in singing accuracy assessment for research and classroom uses. Three pitch-matching tasks--single pitch,…

  19. 49 CFR 178.277 - Requirements for the design, construction, inspection and testing of portable tanks intended for...

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... design pressure in the ASME Code, Section VIII (IBR, see § 171.7 of this subchapter). Holding time is the... 49 Transportation 3 2011-10-01 2011-10-01 false Requirements for the design, construction... FOR PACKAGINGS Specifications for Portable Tanks § 178.277 Requirements for the design, construction...

  20. 49 CFR 178.277 - Requirements for the design, construction, inspection and testing of portable tanks intended for...

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... design pressure in the ASME Code, Section VIII (IBR, see § 171.7 of this subchapter). Holding time is the... 49 Transportation 3 2012-10-01 2012-10-01 false Requirements for the design, construction... FOR PACKAGINGS Specifications for Portable Tanks § 178.277 Requirements for the design, construction...

  1. 49 CFR 178.277 - Requirements for the design, construction, inspection and testing of portable tanks intended for...

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... design pressure in the ASME Code, Section VIII (IBR, see § 171.7 of this subchapter). Holding time is the... 49 Transportation 3 2014-10-01 2014-10-01 false Requirements for the design, construction... FOR PACKAGINGS Specifications for Portable Tanks § 178.277 Requirements for the design, construction...

  2. 49 CFR 178.277 - Requirements for the design, construction, inspection and testing of portable tanks intended for...

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... design pressure in the ASME Code, Section VIII (IBR, see § 171.7 of this subchapter). Holding time is the... 49 Transportation 2 2010-10-01 2010-10-01 false Requirements for the design, construction... FOR PACKAGINGS Specifications for Portable Tanks § 178.277 Requirements for the design, construction...

  3. 49 CFR 178.277 - Requirements for the design, construction, inspection and testing of portable tanks intended for...

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... design pressure in the ASME Code, Section VIII (IBR, see § 171.7 of this subchapter). Holding time is the... 49 Transportation 3 2013-10-01 2013-10-01 false Requirements for the design, construction... FOR PACKAGINGS Specifications for Portable Tanks § 178.277 Requirements for the design, construction...

  4. 46 CFR 61.40-3 - Design verification testing.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 2 2011-10-01 2011-10-01 false Design verification testing. 61.40-3 Section 61.40-3... INSPECTIONS Design Verification and Periodic Testing of Vital System Automation § 61.40-3 Design verification testing. (a) Tests must verify that automated vital systems are designed, constructed, and operate in...

  5. Development of a test facility to evaluate the optimal design of BMPs for managing environmental problems at construction sites.

    DOT National Transportation Integrated Search

    2012-06-01

    The following document is the final report for ALDOT Project 930655 which summarizes the design and : construction of the Auburn University Erosion and Sediment Control Testing Facility (AUESCTF) along : with several intermediatescale, f...

  6. 46 CFR 61.40-3 - Design verification testing.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) MARINE ENGINEERING PERIODIC TESTS AND INSPECTIONS Design Verification and Periodic Testing of Vital System Automation § 61.40-3 Design verification testing. (a) Tests must verify that automated vital systems are designed, constructed, and operate in...

  7. A Theoretical and Empirical Comparison of Three Approaches to Achievement Testing.

    ERIC Educational Resources Information Center

    Haladyna, Tom; Roid, Gale

    Three approaches to the construction of achievement tests are compared: construct, operational, and empirical. The construct approach is based upon classical test theory and measures an abstract representation of the instructional objectives. The operational approach specifies instructional intent through instructional objectives, facet design,…

  8. Flexible Multi-Body Spacecraft Simulator: Design, Construction, and Experiments

    DTIC Science & Technology

    2017-12-01

    BODY SPACECRAFT SIMULATOR: DESIGN , CONSTRUCTION, AND EXPERIMENTS by Adam L. Atwood December 2017 Thesis Advisor: Mark Karpenko Second...TYPE AND DATES COVERED Master’s thesis 4. TITLE AND SUBTITLE FLEXIBLE MULTI-BODY SPACECRAFT SIMULATOR: DESIGN , CONSTRUCTION, AND EXPERIMENTS 5...spacecraft simulator for use in testing optimal control-based slew and maneuver designs . The simulator is modified from an earlier prototype, which

  9. Test plan : I-40 TTIS focus groups and personal interview

    DOT National Transportation Integrated Search

    1976-04-01

    This provides specific design recommendations, design considerations, and construction techniques for the construction of lateral support systems and underpinning. The design considerations are presented for each technique or method (solider piles, s...

  10. Equipment for testing automotive lead/acid batteries under SAE J240a conditions

    NASA Astrophysics Data System (ADS)

    Hamilton, J. A.; Rand, D. A. J.

    Battery cycling equipment has been designed and constructed to test lead/acid batteries according to the American Society of Automotive Engineers' (SAE) J240a Standard. This life test simulates automotive service where the battery operates in a voltage-regulated charging system. The CSIRO design uses a master/slave concept to reduce both construction time and cost.

  11. A Duplicate Construction Experiment.

    ERIC Educational Resources Information Center

    Bridgeman, Brent

    This experiment was designed to assess the ability of item writers to construct truly parallel tests based on a "duplicate-construction experiment" in which Cronbach argues that if the universe description and sampling are ideally refined, the two independently constructed tests will be entirely equivalent, and that within the limits of item…

  12. Space station structures and dynamics test program

    NASA Technical Reports Server (NTRS)

    Moore, Carleton J.; Townsend, John S.; Ivey, Edward W.

    1987-01-01

    The design, construction, and operation of a low-Earth orbit space station poses unique challenges for development and implementation of new technology. The technology arises from the special requirement that the station be built and constructed to function in a weightless environment, where static loads are minimal and secondary to system dynamics and control problems. One specific challenge confronting NASA is the development of a dynamics test program for: (1) defining space station design requirements, and (2) identifying the characterizing phenomena affecting the station's design and development. A general definition of the space station dynamic test program, as proposed by MSFC, forms the subject of this report. The test proposal is a comprehensive structural dynamics program to be launched in support of the space station. The test program will help to define the key issues and/or problems inherent to large space structure analysis, design, and testing. Development of a parametric data base and verification of the math models and analytical analysis tools necessary for engineering support of the station's design, construction, and operation provide the impetus for the dynamics test program. The philosophy is to integrate dynamics into the design phase through extensive ground testing and analytical ground simulations of generic systems, prototype elements, and subassemblies. On-orbit testing of the station will also be used to define its capability.

  13. Design, Construction, and Test of a 473 MHZ Four - Cavity Rfq.

    NASA Astrophysics Data System (ADS)

    Kazimi, Reza

    1992-01-01

    An RFQ accelerator using the new four-rod cavity design has been fabricated and successfully tested at Texas Accelerator Center. The RFQ is designed to accelerate a 10 mA H^- ion beam from 30 keV to 500 keV with the operating frequency of 473 MHz. This new type of RFQ structure not only promises simplicity of design, construction, and operation, but also can be manufactured to operate at higher frequencies than previously achieved by other four-rod type RFQs. Combination of simplicity and compactness due to higher operating frequencies (400 to 500 MHz) makes the design desirable for injector of proton accelerators, medical linear accelerators, and variety of other applications. This dissertation presents the steps I went through in inventing, developing, and experimentally testing this new RFQ design. First an introduction to accelerators is given, and the basic accelerator physics terminologies are defined. The principles of operations of the RFQs are described, and the theory behind new type of RFQ structure is explained. Then the beam dynamics and cavity design of the RFQ are presented. Finally, the mechanical design and construction procedure are discussed, and experimental results of rf tests and actual H ^- beam test are given.

  14. Car Builder: Design, Construct and Test Your Own Cars. School Version with Lesson Plans. [CD-ROM].

    ERIC Educational Resources Information Center

    Highsmith, Joni Bitman

    Car Builder is a scientific CD-ROM-based simulation program that lets students design, construct, modify, test, and compare their own cars. Students can design sedans, four-wheel-drive vehicles, vans, sport cars, and hot rods. They may select for aerodynamics, power, and racing ability, or economic and fuel efficiency. It is a program that teaches…

  15. Technical memo : project 0-6132 (task 6).

    DOT National Transportation Integrated Search

    2010-04-01

    The attached memo presents construction information on the test sections placed by Madden Construction on US 59 on March 26th 2010. The memo includes details of the mix design, shows photographs of the construction sequence, lab test data on the Cont...

  16. Flux-canceling electrodynamic maglev suspension. Part 1: Test fixture design and modeling

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Thompson, M.T.; Thornton, R.D.; Kondoleon, A.

    1999-05-01

    The design and analysis of a scale-model suspension test facility for magnetic levitation (maglev) is discussed. The authors describe techniques for the design, construction, and testing of a prototype electrodynamic suspension (EDS) levitation system. The viability of future high-temperature superconducting magnet designs for maglev has been investigated with regard to their application to active secondary suspensions. In order to test the viability of a new flux-canceling EDS suspension, a 1/5-scale suspension magnet and guideway was constructed. The suspension was tested by using a high-speed rotating test wheel facility with linear peripheral speed of up to 84 m/s (300 km/h). Amore » set of approximate design tools and scaling laws has been developed in order to evaluate forces and critical velocities in the suspension.« less

  17. Design, construction, and testing of a five active axes magnetic bearing system

    NASA Technical Reports Server (NTRS)

    Delprete, Cristiana; Genta, Giancarlo; Carabelli, Stefano

    1994-01-01

    A high speed electric spindle based on active electromagnetic suspension technology has been designed, built, and tested. The main goal of the research work was the construction of a highly modular unit which can be used for teaching and research purposes. The design of the electromechanical components and of the control unit is described in detail, together with the characterization tests performed on the various subsystems. A description of the preliminary tests on the unit, conducted at speeds not in excess of the first deformation critical speed of the rotor, concludes the work.

  18. Multistage Complexity in Language Proficiency Assessment: A Framework for Aligning Theoretical Perspectives, Test Development, and Psychometrics

    ERIC Educational Resources Information Center

    Luecht, Richard M.

    2003-01-01

    This article contends that the necessary links between constructs and test scores/decisions in language assessment must be established through principled design procedures that align three models: (1) a theoretical construct model; (2) a test development model; and (3) a psychometric scoring model. The theoretical construct model articulates the…

  19. Lightweight composites for modular panelized construction

    NASA Astrophysics Data System (ADS)

    Vaidya, Amol S.

    Rapid advances in construction materials technology have enabled civil engineers to achieve impressive gains in the safety, economy, and functionality of structures built to serve the common needs of society. Modular building systems is a fast-growing modern, form of construction gaining recognition for its increased efficiency and ability to apply modern technology to the needs of the market place. In the modular construction technique, a single structural panel can perform a number of functions such as providing thermal insulation, vibration damping, and structural strength. These multifunctional panels can be prefabricated in a manufacturing facility and then transferred to the construction site. A system that uses prefabricated panels for construction is called a "panelized construction system". This study focuses on the development of pre-cast, lightweight, multifunctional sandwich composite panels to be used for panelized construction. Two thermoplastic composite panels are proposed in this study, namely Composite Structural Insulated Panels (CSIPs) for exterior walls, floors and roofs, and Open Core Sandwich composite for multifunctional interior walls of a structure. Special manufacturing techniques are developed for manufacturing these panels. The structural behavior of these panels is analyzed based on various building design codes. Detailed descriptions of the design, cost analysis, manufacturing, finite element modeling and structural testing of these proposed panels are included in this study in the of form five peer-reviewed journal articles. The structural testing of the proposed panels involved in this study included flexural testing, axial compression testing, and low and high velocity impact testing. Based on the current study, the proposed CSIP wall and floor panels were found satisfactory, based on building design codes ASCE-7-05 and ACI-318-05. Joining techniques are proposed in this study for connecting the precast panels on the construction site. Keywords: Modular panelized construction, sandwich composites, composite structural insulated panels (CSIPs).

  20. A Student-Constructed Test Learning System: The Design, Development and Evaluation of Its Pedagogical Potential

    ERIC Educational Resources Information Center

    Yu, Fu-Yun; Su, Chia-Ling

    2015-01-01

    Although research has found that student-constructed tests (SCT) have some potential for promoting cognitive elaboration, as yet there are no systems available to support the associated activities. This study designed and developed an SCT learning system guided by the ideology of contribution-based pedagogies, accentuating the principles of…

  1. Using Automated Essay Scores as an Anchor When Equating Constructed Response Writing Tests

    ERIC Educational Resources Information Center

    Almond, Russell G.

    2014-01-01

    Assessments consisting of only a few extended constructed response items (essays) are not typically equated using anchor test designs as there are typically too few essay prompts in each form to allow for meaningful equating. This article explores the idea that output from an automated scoring program designed to measure writing fluency (a common…

  2. Students' Initial Knowledge State and Test Design: Towards a Valid and Reliable Test Instrument

    ERIC Educational Resources Information Center

    CoPo, Antonio Roland I.

    2015-01-01

    Designing a good test instrument involves specifications, test construction, validation, try-out, analysis and revision. The initial knowledge state of forty (40) tertiary students enrolled in Business Statistics course was determined and the same test instrument undergoes validation. The designed test instrument did not only reveal the baseline…

  3. Panel Design Variations in the Multistage Test Using the Mixed-Format Tests

    ERIC Educational Resources Information Center

    Kim, Jiseon; Chung, Hyewon; Dodd, Barbara G.; Park, Ryoungsun

    2012-01-01

    This study compared various panel designs of the multistage test (MST) using mixed-format tests in the context of classification testing. Simulations varied the design of the first-stage module. The first stage was constructed according to three levels of test information functions (TIFs) with three different TIF centers. Additional computerized…

  4. The design and implementation of image query system based on color feature

    NASA Astrophysics Data System (ADS)

    Yao, Xu-Dong; Jia, Da-Chun; Li, Lin

    2013-07-01

    ASP.NET technology was used to construct the B/S mode image query system. The theory and technology of database design, color feature extraction from image, index and retrieval in the construction of the image repository were researched. The campus LAN and WAN environment were used to test the system. From the test results, the needs of user queries about related resources were achieved by system architecture design.

  5. Processes in construction of failure management expert systems from device design information

    NASA Technical Reports Server (NTRS)

    Malin, Jane T.; Lance, Nick

    1987-01-01

    This paper analyzes the tasks and problem solving methods used by an engineer in constructing a failure management expert system from design information about the device to te diagnosed. An expert test engineer developed a trouble-shooting expert system based on device design information and experience with similar devices, rather than on specific expert knowledge gained from operating the device or troubleshooting its failures. The construction of the expert system was intensively observed and analyzed. This paper characterizes the knowledge, tasks, methods, and design decisions involved in constructing this type of expert system, and makes recommendations concerning tools for aiding and automating construction of such systems.

  6. 48 CFR 36.601-4 - Implementation.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... engineering nature associated with design or construction of real property. (3) Other professional services of..., investigations, surveying and mapping, tests, evaluations, consultations, comprehensive planning, program management, conceptual designs, plans and specifications, value engineering, construction phase services...

  7. 48 CFR 36.601-4 - Implementation.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... engineering nature associated with design or construction of real property. (3) Other professional services of..., investigations, surveying and mapping, tests, evaluations, consultations, comprehensive planning, program management, conceptual designs, plans and specifications, value engineering, construction phase services...

  8. 48 CFR 36.601-4 - Implementation.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... engineering nature associated with design or construction of real property. (3) Other professional services of..., investigations, surveying and mapping, tests, evaluations, consultations, comprehensive planning, program management, conceptual designs, plans and specifications, value engineering, construction phase services...

  9. 48 CFR 36.601-4 - Implementation.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... engineering nature associated with design or construction of real property. (3) Other professional services of..., investigations, surveying and mapping, tests, evaluations, consultations, comprehensive planning, program management, conceptual designs, plans and specifications, value engineering, construction phase services...

  10. 48 CFR 36.601-4 - Implementation.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... engineering nature associated with design or construction of real property. (3) Other professional services of..., investigations, surveying and mapping, tests, evaluations, consultations, comprehensive planning, program management, conceptual designs, plans and specifications, value engineering, construction phase services...

  11. Alternative Shear Panel Configurations for Light Wood Construction. Development, Seismic Performance, and Design Guidance

    NASA Astrophysics Data System (ADS)

    Wilcoski, James; Fischer, Chad; Allison, Tim; Malach, Kelly Jo

    2002-04-01

    Shear panels are used in light wood construction to resist lateral loads resulting from earthquakes or strong winds. These panels are typically made of wooden sheathing nailed to building frame members, but this standard panel design interferes with the installation of sheet insulation. A non-insulated shear panel conducts heat between the building interior and exterior wasting considerable amounts of energy. Several alternative shear panel designs were developed to avoid this insulation-mounting problem and sample panels were tested according to standard cyclic test protocols. One of the alternative designs consisted of diagonal steel straps nailed directly to the structural framing. Several others consisted of sheathing nailed to 2 x 4 framing then set into a larger 2 x 6 structural frame in such a way that no sheathing protruded beyond the edge of the 2 x 6 members. Also samples of industry-standard shear panels were constructed and tested in order to establish a performance baseline. Analytical models were developed to size test panels and predict panel behavior. A procedure was developed for establishing design capacities based on both test data and established baseline panel design capacity. The behavior of each panel configuration is documented and recommended design capacities are presented.

  12. Cosmo Cassette: A Microfluidic Microgravity Microbial System For Synthetic Biology Unit Tests and Satellite Missions

    NASA Technical Reports Server (NTRS)

    Berliner, Aaron J.

    2013-01-01

    Although methods in the design-build-test life cycle of the synthetic biology field have grown rapidly, the expansion has been non-uniform. The design and build stages in development have seen innovations in the form of biological CAD and more efficient means for building DNA, RNA, and other biological constructs. The testing phase of the cycle remains in need of innovation. Presented will be both a theoretical abstraction of biological measurement and a practical demonstration of a microfluidics-based platform for characterizing synthetic biological phenomena. Such a platform demonstrates a design of additive manufacturing (3D printing) for construction of a microbial fuel cell (MFC) to be used in experiments carried out in space. First, the biocompatibility of the polypropylene chassis will be demonstrated. The novel MFCs will be cheaper, and faster to make and iterate through designs. The novel design will contain a manifold switchingdistribution system and an integrated in-chip set of reagent reservoirs fabricated via 3D printing. The automated nature of the 3D printing yields itself to higher resolution switching valves and leads to smaller sized payloads, lower cost, reduced power and a standardized platform for synthetic biology unit tests on Earth and in space. It will be demonstrated that the application of unit testing in synthetic biology will lead to the automatic construction and validation of desired constructs. Unit testing methodologies offer benefits of preemptive problem identification, change of facility, simplicity of integration, ease of documentation, and separation of interface from implementation, and automated design.

  13. Qualitative Variation in Constructive Alignment in Curriculum Design

    ERIC Educational Resources Information Center

    Trigwell, Keith; Prosser, Michael

    2014-01-01

    Constructive alignment has emerged as a powerful curriculum design idea, but little is known of the extent to which the effectiveness of this idea is a function of qualitative variation. This article introduces a model of qualitative variation in constructive alignment, and uses the results from known alignment studies to test the model. The…

  14. Creating and Testing a Model for Tutors and Participants to Support the Collaborative Construction of Knowledge Online

    ERIC Educational Resources Information Center

    Seddon, Kathy; Postlethwaite, Keith

    2007-01-01

    This paper describes the construction and testing of a model designed to inform contributors to online collaborative dialogues about the nature of their contribution, and to guide the input from tutors who facilitate these dialogues. In particular, the model was designed to assist reflection on learning behaviours in online dialogues by…

  15. Active/passive scanning. [airborne multispectral laser scanners for agricultural and water resources applications

    NASA Technical Reports Server (NTRS)

    Woodfill, J. R.; Thomson, F. J.

    1979-01-01

    The paper deals with the design, construction, and applications of an active/passive multispectral scanner combining lasers with conventional passive remote sensors. An application investigation was first undertaken to identify remote sensing applications where active/passive scanners (APS) would provide improvement over current means. Calibration techniques and instrument sensitivity are evaluated to provide predictions of the APS's capability to meet user needs. A preliminary instrument design was developed from the initial conceptual scheme. A design review settled the issues of worthwhile applications, calibration approach, hardware design, and laser complement. Next, a detailed mechanical design was drafted and construction of the APS commenced. The completed APS was tested and calibrated in the laboratory, then installed in a C-47 aircraft and ground tested. Several flight tests completed the test program.

  16. DOE Office of Scientific and Technical Information (OSTI.GOV)

    A. Herk; Poerschke, A.; Beach, R.

    In 2012-2013, IBACOS worked with a builder, Brookfield Homes in Denver, Colorado, to design and construct a Passive House certified model home. IBACOS used several modeling programs and calculation methods to complete the final design package along with Brookfield's architect KGA Studio. This design package included upgrades to the thermal enclosure, basement insulation, windows, and heating, ventilation, and air conditioning. Short-term performance testing in the Passive House was done during construction and after construction.

  17. Some Remarks on Foundation Pile Testing Procedures

    NASA Astrophysics Data System (ADS)

    Rybak, Jarosław

    2017-10-01

    This work presents the review of pile capacity testing techniques. In an overview, the key points in pile designing are: determination of the appropriate computational schemes, reliable data on loads and the properties of structural materials (in particular, of the soil mass, which is marked by the greatest variability). The procedure of constructing a pile foundation should include: carrying out soil tests in the scope that ensures safe designing, selecting a piling technology that is relevant both to geotechnical conditions and expected loads, drafting a piling design together with the design of load tests, setting up a testing station for further load tests, static and/or dynamic tests of pile load capacity, preceded by supplementary soil tests when the conditions of test pile installation fail to comply with the design assumptions or when the pile length exceeds the depth of the previously investigated soil, making documentation of load capacity tests (with an additional correction of the piling design), the actual piling (ongoing analysis of pile driving logs and, if necessary, testing the piles’ integrity), drawing up the as-built documentation. Unfortunately, the design is corrected after the load test have been conducted only if the piles fail to show the designed bearing capacity. The designer is then obliged to revise the design assumptions on the basis of tests results. If the test results account for the a greater bearing capacity than necessary and it would be recommendable to limit the extent of the planned (i.e. set out in the contract) piling works, usually neither the contractor nor the designer, nor even the Construction Site Supervisor, acting for the benefit of the Investor, are willing to take on the responsibility for reducing the scope of the piling works. The necessity of conducting additional control tests before and during the implementation of the construction project is often treated by the investors as an attempt at extorting extra financial resources or at delaying the project implementation. The designer, however, has no other possibility (and often - he/she does not have required qualifications) to verify the obtained test results.

  18. 49 CFR 173.411 - Industrial packagings.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... comparative data showing that the construction methods, packaging design, and materials of construction comply...-1 must meet the general design requirements prescribed in § 173.410. (2) Each IP-2 must meet the general design requirements prescribed in § 173.410 and when subjected to the tests specified in § 173.465...

  19. 49 CFR 173.411 - Industrial packagings.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... comparative data showing that the construction methods, packaging design, and materials of construction comply...-1 must meet the general design requirements prescribed in § 173.410. (2) Each IP-2 must meet the general design requirements prescribed in § 173.410 and when subjected to the tests specified in § 173.465...

  20. 49 CFR 173.411 - Industrial packagings.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... comparative data showing that the construction methods, packaging design, and materials of construction comply...-1 must meet the general design requirements prescribed in § 173.410. (2) Each IP-2 must meet the general design requirements prescribed in § 173.410 and when subjected to the tests specified in § 173.465...

  1. 49 CFR 173.411 - Industrial packagings.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... comparative data showing that the construction methods, packaging design, and materials of construction comply...-1 must meet the general design requirements prescribed in § 173.410. (2) Each IP-2 must meet the general design requirements prescribed in § 173.410 and when subjected to the tests specified in § 173.465...

  2. Design and Architecture of Collaborative Online Communities: A Quantitative Analysis

    ERIC Educational Resources Information Center

    Aviv, Reuven; Erlich, Zippy; Ravid, Gilad

    2004-01-01

    This paper considers four aspects of online communities. Design, mechanisms, architecture, and the constructed knowledge. We hypothesize that different designs of communities drive different mechanisms, which give rise to different architectures, which in turn result in different levels of collaborative knowledge construction. To test this chain…

  3. Student-Designed Flume Arrives at NWTC | News | NREL

    Science.gov Websites

    opportunity to plan, design, and construct a flume for testing and characterizing hydrokinetic power devices . The project was one of several open to CSM students as part of the Capstone Design@Mines program transported to the National Wind Technology Center (NWTC) on Dec. 7. "The design and construction of the

  4. Confidence intervals for single-case effect size measures based on randomization test inversion.

    PubMed

    Michiels, Bart; Heyvaert, Mieke; Meulders, Ann; Onghena, Patrick

    2017-02-01

    In the current paper, we present a method to construct nonparametric confidence intervals (CIs) for single-case effect size measures in the context of various single-case designs. We use the relationship between a two-sided statistical hypothesis test at significance level α and a 100 (1 - α) % two-sided CI to construct CIs for any effect size measure θ that contain all point null hypothesis θ values that cannot be rejected by the hypothesis test at significance level α. This method of hypothesis test inversion (HTI) can be employed using a randomization test as the statistical hypothesis test in order to construct a nonparametric CI for θ. We will refer to this procedure as randomization test inversion (RTI). We illustrate RTI in a situation in which θ is the unstandardized and the standardized difference in means between two treatments in a completely randomized single-case design. Additionally, we demonstrate how RTI can be extended to other types of single-case designs. Finally, we discuss a few challenges for RTI as well as possibilities when using the method with other effect size measures, such as rank-based nonoverlap indices. Supplementary to this paper, we provide easy-to-use R code, which allows the user to construct nonparametric CIs according to the proposed method.

  5. IPAD II (Integrated Programs for Aerospace-Vehicle Design) Advances in Distributed Data Base Management for CAD/CAM (Computer-Aided Design and Manufacturing Technology). Proceedings of a National Symposium Held in Denver, Colorado, April 17-19, 1984.

    DTIC Science & Technology

    1984-01-01

    working drawings, lists, and miscellaneous information needed for construction and testing (fig. 4). Detail design and construction in- cludes...still in test and evaluation phases, and is currently operational on a CDC computer. Its approach to management of geometric data is a unique and...been to provide the high degree of engineering user flexibility and yet achieve acceptable response times. In late 1983, a test system which has user

  6. The Ares Launch Vehicles: Critical for America's Continued Leadership in Space

    NASA Technical Reports Server (NTRS)

    Cook, Stephen A.

    2009-01-01

    This video is designed to accompany the presentation of the paper delivered at the Joint Army, Navy, NASA, Airforce (JANNAF) Propulsion Meeting held in 2009. It shows various scenes: from the construction of the A-3 test stand, construction of portions of the vehicles, through various tests of the components of the Ares Launch Vehicles, including wind tunnel testing of the Ares V, shell buckling tests, and thermal tests of the avionics, to the construction of the TPS thermal spray booth.

  7. Development and Field Testing of a Model to Simulate a Demonstration of Le Chatelier's Principle Using the Wheatstone Bridge Circuit.

    ERIC Educational Resources Information Center

    Vickner, Edward Henry, Jr.

    An electronic simulation model was designed, constructed, and then field tested to determine student opinion of its effectiveness as an instructional aid. The model was designated as the Equilibrium System Simulator (ESS). The model was built on the principle of electrical symmetry applied to the Wheatstone bridge and was constructed from readily…

  8. HANFORD MEDIUM-LOW CURIE WASTE PRETREATMENT ALTERNATIVES PROJECT FRACTIONAL CRYSTALLIZATION PILOT SCALE TESTING FINAL REPORT

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    HERTING DL

    2008-09-16

    The Fractional Crystallization Pilot Plant was designed and constructed to demonstrate that fractional crystallization is a viable way to separate the high-level and low-activity radioactive waste streams from retrieved Hanford single-shell tank saltcake. The focus of this report is to review the design, construction, and testing details of the fractional crystallization pilot plant not previously disseminated.

  9. S-band range tracker and Surveillance Lab interface

    NASA Astrophysics Data System (ADS)

    Bush, B. D.

    1983-09-01

    This report documents the design, construction, test and laboratory integration of the range tracker and associated subsystems for the RADC/OC Surveillance Laboratory's S-Band tracking radar. This development was accomplished over the period from December 1981 to November 1983 and was designed, constructed and tested entirely in-house. This report contains information on the use of the range tracker, its interfaces to other laboratory equipment, the philosophy behind its design, the detailed design of the hardware (including schematics, timing and cabling diagrams), the detailed software design (including flowcharts), and the mathematical description of its algorithms. The range tracker will be used in conjunction with other equipment in the OC Surveillance Lab in the taking and recording of radar data during flight tests.

  10. The development of anti-heat stress clothing for construction workers in hot and humid weather.

    PubMed

    Chan, Albert P C; Guo, Y P; Wong, Francis K W; Li, Y; Sun, S; Han, X

    2016-04-01

    The purpose of this study was to develop anti-heat stress clothing for construction workers in hot and humid weather. Following DeJonge's functional clothing design process, the design situation was explored, including clothing fabric heat/moisture transporting properties and UV protection and the aspects of clothing ergonomic design (mobility, convenience, and safety). The problem structure was derived from the results of the surveys in three local construction sites, which agreed well with the task requirements and observations. Specifications were consequently described and 30 commercially available fabrics were identified and tested. Fabric testing data and design considerations were inputted in S-smart system to predict the thermal functional performance of the clothing. A new uniform prototype was developed and evaluated. The results of all measurements suggest that the new uniform which incorporated fabrics with superior heat/moisture transporting properties and loose-fitting design could reduce the workers' heat stress and improve their comfort and work performance. Practitioner Summary: The construction workers' uniform currently used in Hong Kong during summer was unsatisfactory. Following DeJonge's functional clothing design process, an anti-heat stress uniform was developed by testing 30 fabrics and predicting clothing thermal functional performance using S-smart system. The new uniform could reduce the workers' heat stress and improve their comfort and work performance.

  11. Design, Construction and Test of Cryogen-Free HTS Coil Structure

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hocker, H.; Anerella, M.; Gupta, R.

    2011-03-28

    This paper will describe design, construction and test results of a cryo-mechanical structure to study coils made with the second generation High Temperature Superconductor (HTS) for the Facility for Rare Isotope Beams (FRIB). A magnet comprised of HTS coils mounted in a vacuum vessel and conduction-cooled with Gifford-McMahon cycle cryocoolers is used to develop and refine design and construction techniques. The study of these techniques and their effect on operations provides a better understanding of the use of cryogen free magnets in future accelerator projects. A cryogen-free, superconducting HTS magnet possesses certain operational advantages over cryogenically cooled, low temperature superconductingmore » magnets.« less

  12. 77 FR 1973 - Petition for Exemption From the Vehicle Theft Prevention Standard; Fuji Heavy Industries U.S.A...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-12

    ... description and diagram of the identity, design and location of the components of the antitheft device for the... the antitheft device and the immobilization features are constructed and designed within the vehicle's... test. Additionally, FUSA stated that since the immobilization features are designed and constructed...

  13. Implant material and design alter construct stiffness in distal femur locking plate fixation: a pilot study.

    PubMed

    Schmidt, Ulf; Penzkofer, Rainer; Bachmaier, Samuel; Augat, Peter

    2013-09-01

    Construct stiffness affects healing of bones fixed with locking plates. However, variable construct stiffness reported in the literature may be attributable to differing test configurations and direct comparisons may clarify these differences. We therefore asked whether different distal femur locking plate systems and constructs will lead to different (1) axial and rotational stiffness and (2) fatigue under cyclic loading. We investigated four plate systems for distal femur fixation (AxSOS, LCP, PERI-LOC, POLYAX) of differing designs and materials using bone substitutes in a distal femur fracture model (OTA/AO 33-A3). We created six constructs of each of the four plating systems. Stiffness under static and cyclic loading and fatigue under cyclic loading were measured. Mean construct stiffness under axial loading was highest for AxSOS (100.8 N/mm) followed by PERI-LOC (80.8 N/mm) and LCP (62.6 N/mm). POLYAX construct stiffness testing showed the lowest stiffness (51.7 N/mm) with 50% stiffness of AxSOS construct testing. Mean construct stiffness under torsional loading was similar in the group of AxSOS and PERI-LOC (3.40 Nm/degree versus 3.15 Nm/degree) and in the group of LCP and POLYAX (2.63 Nm/degree versus 2.56 Nm/degree). The fourth load level of > 75,000 cycles was reached by three of six AxSOS, three of six POLYAX, and two of six PERI-LOC constructs. All others including all LCP constructs failed earlier. Implant design and material of new-generation distal femur locking plate systems leads to a wide range of differences in construct stiffness. Assuming construct stiffness affects fracture healing, these data may influence surgical decision-making in choosing an implant system.

  14. Structural and thermal testing of lightweight reflector panels

    NASA Technical Reports Server (NTRS)

    Mcgregor, J.; Helms, R.; Hill, T.

    1992-01-01

    The paper describes the test facility developed for testing large lightweight reflective panels with very accurate and stable surfaces, such as the mirror panels of composite construction developed for the NASA's Precision Segmented Reflector (PSR). Special attention is given to the panel construction and the special problems posed by the characteristics of these panels; the design of the Optical/Thermal Vacuum test facility for structural and thermal testing, developed at the U.S. AFPL; and the testing procedure. The results of the PSR panel test program to date are presented. The test data showed that the analytical approaches used for the panel design and for the prediction of the on-orbit panel behavior were adequate.

  15. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Herk, A.; Poerschke, A.; Beach, R.

    In 2012-2013, IBACOS worked with a builder, Brookfield Homes in Denver, Colorado, to design and construct a Passive House certified model home. IBACOS used several modeling programs and calculation methods to complete the final design package along with Brookfield's architect KGA Studio. This design package included upgrades to the thermal enclosure, basement insulation, windows, and heating, ventilation, and air conditioning. Short-term performance testing in the Passive House was done during construction and after construction. Testing with a blower door indicated that whole-building air leakage to the outside was 324 CFM and 0.60 ACH50. The other two test homes had littlemore » short-term testing done post-construction by the local energy rater. IBACOS then monitored the energy consumption and whole-house comfort conditions of that occupied Passive House after one year of operation and compared the monitoring results to those for two other occupied test houses in the same area with similar square footage but slightly different floor plans. IBACOS also assisted the builder, Brookfield Homes, in researching design scenarios for Zero Energy Ready Home and ENERGY STAR acceptance levels. IBACOS also assisted Brookfield in conceptualizing product for Denver's Brighton Heights area. Brookfield was considering building to Zero Energy Ready Home standards in that location. IBACOS provided strategies that Brookfield may draw from in the event the builder chooses to pursue a Zero Energy Ready Home plan for that market.« less

  16. Reformulation of the CBR Procedure, Report 2: Design, Construction, and Behavior Under Traffic of the Pavement Test Sections

    DTIC Science & Technology

    2013-12-01

    shows the clay moisture- density curve. The design subgrade CBR values selected for the test section construction were 4%, 10%, and 15%. The high...9  Figure 7. Subgrade moisture- density curve...view of Hangar 4. (a) (b) The in situ soil was a lean clay (loess) deposit, and the depth to the groundwater table was approximately 6 ft

  17. Eddy Current Flow Measurements in the FFTF

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Nielsen, Deborah L.; Polzin, David L.; Omberg, Ronald P.

    2017-02-02

    The Fast Flux Test Facility (FFTF) is the most recent liquid metal reactor (LMR) to be designed, constructed, and operated by the U.S. Department of Energy (DOE). The 400-MWt sodium-cooled, fast-neutron flux reactor plant was designed for irradiation testing of nuclear reactor fuels and materials for liquid metal fast breeder reactors. Following shut down of the Clinch River Breeder Reactor Plant (CRBRP) project in 1983, FFTF continued to play a key role in providing a test bed for demonstrating performance of advanced fuel designs and demonstrating operation, maintenance, and safety of advanced liquid metal reactors. The FFTF Program provides valuablemore » information for potential follow-on reactor projects in the areas of plant system and component design, component fabrication, fuel design and performance, prototype testing, site construction, and reactor control and operations. This report provides HEDL-TC-1344, “ECFM Flow Measurements in the FFTF Using Phase-Sensitive Detectors”, March 1979.« less

  18. Reinforce Design and Construction Issues with a Comprehensive Laboratory Project.

    ERIC Educational Resources Information Center

    Schemmel, John J.

    In 1996, a comprehensive project was introduced in the first course of Reinforced Concrete Design, CVEG 4303 at the University of Arkansas. The primary purpose of this project was to highlight issues related to the construction of reinforced concrete elements. This semester-long project involves the design, fabrication, and testing of 8-foot long…

  19. 47 CFR 25.113 - Station construction, launch authority, and operation of spare satellites.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... this part, and technical design requirements. Prior to commencing such construction and pre-operational... specify the frequencies the licensee proposes to use for pre-operational testing and the name, address... resulting from such testing. MSS/ATC licensees engaging in pre-operational testing must comply with §§ 5.83...

  20. Reactor for simulation and acceleration of solar ultraviolet damage

    NASA Technical Reports Server (NTRS)

    Laue, E.; Gupta, A.

    1979-01-01

    An environmental test chamber providing acceleration of UV radiation and precise temperature control (+ or -)1 C was designed, constructed and tested. This chamber allows acceleration of solar ultraviolet up to 30 suns while maintaining temperature of the absorbing surface at 30 C - 60 C. This test chamber utilizes a filtered medium pressure mercury arc as the source of radiation, and a combination of selenium radiometer and silicon radiometer to monitor solar ultraviolet (295-340 nm) and total radiant power output, respectively. Details of design and construction and operational procedures are presented along with typical test data.

  1. 33 CFR 159.61 - Vents.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 33 Navigation and Navigable Waters 2 2011-07-01 2011-07-01 false Vents. 159.61 Section 159.61 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) POLLUTION MARINE SANITATION DEVICES Design, Construction, and Testing § 159.61 Vents. Vents must be designed and constructed...

  2. 46 CFR 61.35-1 - General.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ..., DEPARTMENT OF HOMELAND SECURITY (CONTINUED) MARINE ENGINEERING PERIODIC TESTS AND INSPECTIONS Design Verification and Periodic Testing for Automatic Auxiliary Boilers § 61.35-1 General. (a) All automatic... equipment must be tested and inspected to verify their proper design, construction, installation, and...

  3. Design, construction, and testing of a high altitude research glider

    NASA Astrophysics Data System (ADS)

    Parker, Trevor Llewellyn

    Micro aerial vehicle development and atmospheric flight on Mars are areas that require research in very low Reynolds number flight. Facilities for studying these problems are not widely available. The upper atmosphere of the Earth, approximately 100,000 feet AGL, is readily available and closely resembles the atmosphere on Mars, in both temperature and density. This low density also allows normal size test geometry with a very low Reynolds number. This solves a problem in micro aerial vehicle development; it can be very difficult to manufacture instrumented test apparatus in the small sizes required for conventional testing. This thesis documents the design, construction, and testing of a glider designed to be released from a weather balloon at 100,000 feet AGL and operate in this environment, collecting airfoil and aircraft performance data. The challenges of designing a vehicle to operate in a low Reynolds number, low temperature environment are addressed.

  4. Development of a current collection loss management system for SDI homopolar power supplies

    NASA Astrophysics Data System (ADS)

    Brown, D. W.

    1991-04-01

    High speed, high power density current collection systems have been identified as an enabling technology required to construct homopolar power supplies to meet SDI missions. This work is part of a three-year effort directed towards the analysis, experimental verification, and prototype construction of a current collection system designed to operate continuously at 2 kA/sq cm, at a rubbing speed of 200 m/s, and with acceptable losses in a space environment. To date, no system has achieved these conditions simultaneously. This is the final report covering the three year period of performance on DOE contract AC03-86SF-16518. Major areas covered include design, construction and operation of a cryogenically cooled brush test rig, design and construction of a high speed brush test rig, optimization study for homopolar machines, loss analysis of the current collection system, and an application study which defines the air-core homopolar construction necessary to achieve the goal of 80 kW/kg generator power density.

  5. Design and application of electromechanical actuators for deep space missions

    NASA Technical Reports Server (NTRS)

    Haskew, Tim A.; Wander, John

    1994-01-01

    This progress report documents research and development efforts performed from August 16, 1993 through August 15, 1994 on NASA Grant NAG8-240, 'Design and Application of Electromechanical Actuators for Deep Space Missions.' Since the submission of our last progress report in February 1994, our efforts have been almost entirely focused on final construction of the test stand and experiment design. Hence, this report is dedicated solely to these topics. However, updates on our research personnel and our health monitoring and fault management efforts are provided in this summary. Following this executive summary are two report sections. The first is devoted to the motor drive being constructed for the test stand. The thrust of the next section is the mechanical and hydraulic design and construction based on the planned experimental requirements. Following both major sections are three appendices.

  6. 49 CFR 173.415 - Authorized Type A packages.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... tests and an engineering evaluation or comparative data showing that the construction methods, packaging design, and materials of construction comply with that specification. After January 1, 2017 each offeror... meets the pertinent design and performance requirements for a DOT 7A Type A specification package. (2...

  7. 33 CFR 159.97 - Safety: inspected vessels.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 33 Navigation and Navigable Waters 2 2012-07-01 2012-07-01 false Safety: inspected vessels. 159.97...) POLLUTION MARINE SANITATION DEVICES Design, Construction, and Testing § 159.97 Safety: inspected vessels. The Commanding Officer, USCG Marine Safety Center, approves the design and construction of devices to...

  8. 33 CFR 159.97 - Safety: inspected vessels.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 33 Navigation and Navigable Waters 2 2014-07-01 2014-07-01 false Safety: inspected vessels. 159.97...) POLLUTION MARINE SANITATION DEVICES Design, Construction, and Testing § 159.97 Safety: inspected vessels. The Commanding Officer, USCG Marine Safety Center, approves the design and construction of devices to...

  9. 33 CFR 159.97 - Safety: inspected vessels.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 33 Navigation and Navigable Waters 2 2013-07-01 2013-07-01 false Safety: inspected vessels. 159.97...) POLLUTION MARINE SANITATION DEVICES Design, Construction, and Testing § 159.97 Safety: inspected vessels. The Commanding Officer, USCG Marine Safety Center, approves the design and construction of devices to...

  10. 33 CFR 159.97 - Safety: inspected vessels.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 33 Navigation and Navigable Waters 2 2010-07-01 2010-07-01 false Safety: inspected vessels. 159.97...) POLLUTION MARINE SANITATION DEVICES Design, Construction, and Testing § 159.97 Safety: inspected vessels. The Commanding Officer, USCG Marine Safety Center, approves the design and construction of devices to...

  11. Calibration and implementation of miniature electronic cone penetrometers for road and highway design and construction control : final report.

    DOT National Transportation Integrated Search

    1997-12-01

    A prototype miniature electronic cone penetrometer system is developed for road and highway design and construction control. The equipment is implemented in front of the Research Vehicle for Geotechnical In Situ testing and Support (REVEGITS). A cali...

  12. Design, Construction and Test of a Supercapacitor Bank for Space Applications

    NASA Astrophysics Data System (ADS)

    Buergler, Brandon; Simon, Evelyne; Vasina, Petr; Latif, David; Diblik, Lukas; Gineste, Valery; Simcak, Marek

    2014-08-01

    Electrochemical double layer capacitors also referred to as supercapacitors offer a wide range of applications for space flight. The aim of this activity was to evaluate commercial off-the-shelf supercapacitors from different manufacturers in terms of suitability for space applications. Characterisation tests, environmental tests, life tests and abuse tests were carried out. In a second step, a bank of supercapacitors was designed, constructed and subsequentially tested in similar conditions as the individual cells. Based on the results of this work, the application of supercapacitors in future spacecrafts looks promising. The impact of supercapacitors application on system level shall be discussed and a roadmap towards further development activities shall also be outlined.

  13. A One-Piece Lunar Regolith-Bag Garage Prototype

    NASA Technical Reports Server (NTRS)

    Smithers, Gweneth A.; Nehls, Mary K.; Hovater, Mary A.; Evans, Steven W.; Miller, J. Scott; Broughton, Roy M., Jr.; Beale, David; Killinc-Balci, Fatma

    2006-01-01

    Shelter structures on the moon, even in early phases of exploration, should incorporate lunar materials as much as possible. We designed and constructed a prototype for a one-piece regolith-bag unpressurized garage concept, and, in parallel, we conducted a materials testing program to investigate six candidate fabrics to learn how they might perform in the lunar environment. In our concept, a lightweight fabric form is launched from Earth to be landed on the lunar surface and robotically filled with raw lunar regolith. In the materials testing program, regolith-bag fabric candidates included: VectranTM, NextelTM, Gore PTFE FabricTM, ZylonTM TwaronTM and NomexTM. Tensile (including post radiation exposure), fold, abrasion, and hypervelocity impact testing were performed under ambient conditions, and, within our current means, we also performed these tests under cold and elevated temperatures. In some cases, lunar simulant (JSC-1) was used in conjunction with testing. Our ambition is to continuously refine our testing to reach lunar environmental conditions to the extent possible. A series of preliminary structures were constructed during design of the final prototype. Design is based on the principles of the classic masonry arch. The prototype was constructed of KevlarTM and filled with vermiculite (fairly close to the weight of lunar regolith on the moon). The structure is free-standing, but has not yet been load tested. Our plan for the future would be to construct higher fidelty mockups with each iteration, and to conduct appropriate tests of the structure.

  14. A One-Piece Lunar Regolith-Bag Garage Prototype

    NASA Technical Reports Server (NTRS)

    Smithers, Gweneth A.; Nehls, Mary K.; Hovater, Mary A.; Evans, Steven W.; Miller, J. Scott; Broughton, Roy M.; Beale, David; Killing-Balci, Fatma

    2007-01-01

    Shelter structures on the moon, even in early phases of exploration, should incorporate lunar materials as much as possible. We designed and constructed a prototype for a one-piece regolith-bag unpressurized garage concept, and, in parallel, we conducted a materials testing program to investigate six candidate fabrics to learn how they might perform in the lunar environment. In our concept, a lightweight fabric form is launched from Earth to be landed on the lunar surface and robotically filled with raw lunar regolith. In the materials testing program, regolith-bag fabric candidates included: Vectran(TM), Nextel(TM), Gore PTFE Fabric(TM), Zylon(TM), Twaron(TM), and Nomex(TM). Tensile (including post radiation exposure), fold, abrasion, and hypervelocity impact testing were performed under ambient conditions, and, within our current means, we also performed these tests under cold and elevated temperatures. In some cases, lunar simulant (JSC-1) was used in conjunction with testing. Our ambition is to continuously refine our testing to reach lunar environmental conditions to the extent possible. A series of preliminary structures were constructed during design of the final prototype. Design is based on the principles of the classic masonry arch. The prototype was constructed of Kevlar(TM) and filled with vermiculite (fairly close to the weight of lunar regolith on the moon). The structure is free-standing, but has not yet been load tested. Our plan for the future would be to construct higher fidelity mockups with each iteration, and to conduct appropriate tests of the structure.

  15. The VolturnUS 1:8 Floating Wind Turbine: Design, Construction, Deployment, Testing, Retrieval, and Inspection of the First Grid-Connected Offshore Wind Turbine in US

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Dagher, Habib; Viselli, Anthony; Goupee, Andrew

    Volume II of the Final Report for the DeepCwind Consortium National Research Program funded by US Department of Energy Award Number: DE-EE0003278.001 summarizes the design, construction, deployment, testing, numerical model validation, retrieval, and post-deployment inspection of the VolturnUS 1:8-scale floating wind turbine prototype deployed off Castine, Maine on June 2nd, 2013. The 1:8 scale VolturnUS design served as a de-risking exercise for a commercial multi-MW VolturnUS design. The American Bureau of Shipping Guide for Building and Classing Floating Offshore Wind Turbine Installations was used to design the prototype. The same analysis methods, design methods, construction techniques, deployment methods, mooring, andmore » anchoring planned for full-scale were used. A commercial 20kW grid-connected turbine was used and was the first offshore wind turbine in the US.« less

  16. Design, building, and testing of the postlanding systems for the assured crew return vehicle

    NASA Technical Reports Server (NTRS)

    Hosterman, Kenneth C.; Anderson, Loren A.

    1991-01-01

    The design, building, and testing of the postlanding support systems for a water-landing Assured Crew Return Vehicle (ACRV) are presented. One ACRV will be permanently docked to Space Station Freedom, fulfilling NASA's commitment to Assured Crew Return Capability in the event of an accident or illness. The configuration of the ACRV is based on an Apollo Command Module (ACM) derivative. The 1990-1991 effort concentrated on the design, building, and testing of a one-fifth scale model of the egress and stabilization systems. The objective was to determine the feasibility of (1) stabilizing the ACM out of the range of motions that cause seasickness and (2) the safe and rapid removal of a sick or injured crew member from the ACRV. The development of the ACRV postlanding systems model was performed at the University of Central Florida with guidance from the Kennedy Space Center ACRV program managers. Emphasis was placed on four major areas. First was design and construction of a one-fifth scale model of the ACM derivative to accommodate the egress and stabilization systems for testing. Second was the identification of a water test facility suitable for testing the model in all possible configurations. Third was the construction of the rapid egress mechanism designed in the previous academic year for incorporation into the ACRV model. The fourth area was construction and motion response testing of the attitude ring and underwater parachute systems.

  17. An inexpensive and reliable monitoring station design for use with lightweight, compact data loggers

    Treesearch

    Ronald S., Jr. Zalesny; Adam H. Wiese; Edmund O. Bauer; William L., Jr. Headlee; Richard B. Hall; A. Assibi Mahama; Jill A. Zalesny

    2007-01-01

    We designed, constructed, and field-tested an inexpensive and reliable monitoring station that can be used with lightweight, compact data loggers. We feel this design, improved three times over 6 yr, could benefit anyone in nursery or field settings interested in acquiring environmental data. We provide step-by-step instructions on the construction of the monitoring...

  18. Aircraft landing dynamics facility carriage weld test program

    NASA Technical Reports Server (NTRS)

    Lawson, A. G.

    1984-01-01

    A welded tubular structure constructed of low alloy high strength quenched and tempered steel was tested. The consistency of the mechanical strengths and chemical composition and the degree of difficulty of obtaining full strength welds with these steels is characterized. The results of constructing and testing two typical connections which are used in the structure design are reported.

  19. National Reading Tests in Denmark, Norway, and Sweden: A Comparison of Construct Definitions, Cognitive Targets, and Response Formats

    ERIC Educational Resources Information Center

    Tengberg, Michael

    2017-01-01

    Reading comprehension tests are often assumed to measure the same, or at least similar, constructs. Yet, reading is not a single but a multidimensional form of processing, which means that variations in terms of reading material and item design may emphasize one aspect of the construct at the cost of another. The educational systems in Denmark,…

  20. Continuous Assessment in the Oral Communication Class: Teacher Constructed Test.

    ERIC Educational Resources Information Center

    Nair-Venugopal, Shanta

    The oral communication course for English majors at the National University of Malaysia includes testing designed by faculty and coordinated with the curriculum. This practice is based on the ideas that a teacher who has been actively involved in curriculum design is in a good position to design a test for that curriculum, and that teacher-made…

  1. 30 CFR 33.20 - Design and construction.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 30 Mineral Resources 1 2014-07-01 2014-07-01 false Design and construction. 33.20 Section 33.20 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR TESTING, EVALUATION, AND APPROVAL OF MINING PRODUCTS DUST COLLECTORS FOR USE IN CONNECTION WITH ROCK DRILLING IN COAL MINES Dust...

  2. 30 CFR 33.20 - Design and construction.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 30 Mineral Resources 1 2013-07-01 2013-07-01 false Design and construction. 33.20 Section 33.20 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR TESTING, EVALUATION, AND APPROVAL OF MINING PRODUCTS DUST COLLECTORS FOR USE IN CONNECTION WITH ROCK DRILLING IN COAL MINES Dust...

  3. 30 CFR 33.20 - Design and construction.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 30 Mineral Resources 1 2012-07-01 2012-07-01 false Design and construction. 33.20 Section 33.20 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR TESTING, EVALUATION, AND APPROVAL OF MINING PRODUCTS DUST COLLECTORS FOR USE IN CONNECTION WITH ROCK DRILLING IN COAL MINES Dust...

  4. 30 CFR 33.20 - Design and construction.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 1 2011-07-01 2011-07-01 false Design and construction. 33.20 Section 33.20 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR TESTING, EVALUATION, AND APPROVAL OF MINING PRODUCTS DUST COLLECTORS FOR USE IN CONNECTION WITH ROCK DRILLING IN COAL MINES Dust...

  5. 30 CFR 33.20 - Design and construction.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Design and construction. 33.20 Section 33.20 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR TESTING, EVALUATION, AND APPROVAL OF MINING PRODUCTS DUST COLLECTORS FOR USE IN CONNECTION WITH ROCK DRILLING IN COAL MINES Dust...

  6. 10 CFR 52.99 - Inspection during construction.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... license may proceed at its own risk with design and procurement activities, and a licensee may proceed at its own risk with design, procurement, construction, and pre-operational activities, even though the... 10 CFR 50.10(a), whichever is later, its schedule for completing the inspections, tests, or analyses...

  7. 10 CFR 52.99 - Inspection during construction.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... license may proceed at its own risk with design and procurement activities, and a licensee may proceed at its own risk with design, procurement, construction, and pre-operational activities, even though the... 10 CFR 50.10(a), whichever is later, its schedule for completing the inspections, tests, or analyses...

  8. 10 CFR 52.99 - Inspection during construction.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... license may proceed at its own risk with design and procurement activities, and a licensee may proceed at its own risk with design, procurement, construction, and pre-operational activities, even though the... 10 CFR 50.10(a), whichever is later, its schedule for completing the inspections, tests, or analyses...

  9. Lift-Shape Construction, An EFL Project Report.

    ERIC Educational Resources Information Center

    Evans, Ben H.

    Research development of a construction system is detailed in terms of--(1) design and analysis, (2) construction methods, (3) testing, (4) cost analysis, and (5) architectural potentials. The system described permits construction of usual shapes without the use of conventional concrete formwork. The concrete involves development of a structural…

  10. Development of an inflatable radiator system. [for space shuttles

    NASA Technical Reports Server (NTRS)

    Leach, J. W.

    1976-01-01

    Conceptual designs of an inflatable radiator system developed for supplying short duration supplementary cooling of space vehicles are described along with parametric trade studies, materials evaluation/selection studies, thermal and structural analyses, and numerous element tests. Fabrication techniques developed in constructing the engineering models and performance data from the model thermal vacuum tests are included. Application of these data to refining the designs of the flight articles and to constructing a full scale prototype radiator is discussed.

  11. Design and construction of the astronautics refrigerator magnet

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Dresner, L.

    1994-05-01

    This document reports on the design, construction, and testing of a 7-Tesla, 4-in. bore superconducting magnet for use in the Astronautics Refrigerator Experiment. The magnet is a single-strand, layer-wound, potted solenoid wound with Formvar-insulated SSC strands. The magnet was constructed by American Magnetics, Inc. of Oak Ridge and has been installed in the Astronautics Refrigerator Experiment at the Astronautics Technology Center in Madison, Wisconsin.

  12. Long-term monitoring of experimental features, subtask 2 : Alexandria-Ashland highway (KY 9) pavement performance monitoring

    DOT National Transportation Integrated Search

    2000-06-01

    Construction on the AA Highway began in late 1985 and was completed in late 1990. Prior to construction, 30 different test sections had been designed into the highway for evaluation. The test sections contain 23 different characteristic qualities and...

  13. Design, construction, and evaluation of a 1:8 scale model binaural manikin.

    PubMed

    Robinson, Philip; Xiang, Ning

    2013-03-01

    Many experiments in architectural acoustics require presenting listeners with simulations of different rooms to compare. Acoustic scale modeling is a feasible means to create accurate simulations of many rooms at reasonable cost. A critical component in a scale model room simulation is a receiver that properly emulates a human receiver. For this purpose, a scale model artificial head has been constructed and tested. This paper presents the design and construction methods used, proper equalization procedures, and measurements of its response. A headphone listening experiment examining sound externalization with various reflection conditions is presented that demonstrates its use for psycho-acoustic testing.

  14. Passive Magnetic Bearing With Ferrofluid Stabilization

    NASA Technical Reports Server (NTRS)

    Jansen, Ralph; DiRusso, Eliseo

    1996-01-01

    A new class of magnetic bearings is shown to exist analytically and is demonstrated experimentally. The class of magnetic bearings utilize a ferrofluid/solid magnet interaction to stabilize the axial degree of freedom of a permanent magnet radial bearing. Twenty six permanent magnet bearing designs and twenty two ferrofluid stabilizer designs are evaluated. Two types of radial bearing designs are tested to determine their force and stiffness utilizing two methods. The first method is based on the use of frequency measurements to determine stiffness by utilizing an analytical model. The second method consisted of loading the system and measuring displacement in order to measure stiffness. Two ferrofluid stabilizers are tested and force displacement curves are measured. Two experimental test fixtures are designed and constructed in order to conduct the stiffness testing. Polynomial models of the data are generated and used to design the bearing prototype. The prototype was constructed and tested and shown to be stable. Further testing shows the possibility of using this technology for vibration isolation. The project successfully demonstrated the viability of the passive magnetic bearing with ferrofluid stabilization both experimentally and analytically.

  15. Development and Evaluation of Sensor Concepts for Ageless Aerospace Vehicles: Report 3 - Design of the Concept Demonstrator

    NASA Technical Reports Server (NTRS)

    Abbott, David; Ables, Jon; Batten, Adam; Carpenter, David; Collings, Tony; Doyle, Briony; Dunlop, John; Edwards, Graeme; Farmer, Tony; Gaffney, Bruce; hide

    2008-01-01

    This report provides an outline of the essential features of a Structural Health Monitoring Concept Demonstrator (CD) that will be constructed during the next eight months. It is emphasized that the design cannot be considered to be complete, and that design work will continue in parallel with construction and testing. A major advantage of the modular design is that small modules of the system can be developed, tested and modified before a commitment is made to full system development. The CD is expected to develop and evolve for a number of years after its initial construction. This first stage will, of necessity, be relatively simple and have limited capabilities. Later developments will improve all aspects of the functionality of the system, including sensing, processing, communications, intelligence and response. The report indicates the directions this later development will take.

  16. Orbital construction support equipment - Manned remote work station

    NASA Technical Reports Server (NTRS)

    Nassiff, S. H.

    1978-01-01

    The Manned Remote Work Station (MRWS) is a versatile piece of orbital construction support equipment which can support in-space construction in various modes of operation. Proposed near-term Space Shuttle mission support and future large orbiting systems support, along with the various construction modes of MRWS operation, are discussed. Preliminary flight subsystems requirements and configuration design are presented. Integration of the MRWS development test article with the JSC Mockup and Integration Facility, including ground-test objectives and techniques for zero-g simulations, is also presented.

  17. Design and fabrication of a prototype system for a photovoltaic residence in the Northeast

    NASA Astrophysics Data System (ADS)

    1982-08-01

    This project consisted of the design, fabrication, and testing of a photovoltaic residence which is suitable for construction in the Northeast. A full size residence was designed which included energy conserving and passive features, and the energy performance of the residence was completed for a 5 kW PV array in a standoff configuration. Actual construction consisted of the roof structure and a building enclosure large enough to contain the PCU, test equipment, and load simulation equipment. The PV array consists of 78 modules along with a line tie inverter.

  18. The results of a limited study of approaches to the design, fabrication, and testing of a dynamic model of the NASA IOC space station. Executive summary

    NASA Technical Reports Server (NTRS)

    Brooks, George W.

    1985-01-01

    The options for the design, construction, and testing of a dynamic model of the space station were evaluated. Since the definition of the space station structure is still evolving, the Initial Operating Capacity (IOC) reference configuration was used as the general guideline. The results of the studies treat: general considerations of the need for and use of a dynamic model; factors which deal with the model design and construction; and a proposed system for supporting the dynamic model in the planned Large Spacecraft Laboratory.

  19. 10 CFR 60.142 - Design testing.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... construction, a program for in situ testing of such features as borehole and shaft seals, backfill, and the... 10 Energy 2 2010-01-01 2010-01-01 false Design testing. 60.142 Section 60.142 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) DISPOSAL OF HIGH-LEVEL RADIOACTIVE WASTES IN GEOLOGIC REPOSITORIES...

  20. 10 CFR 60.142 - Design testing.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... construction, a program for in situ testing of such features as borehole and shaft seals, backfill, and the... 10 Energy 2 2013-01-01 2013-01-01 false Design testing. 60.142 Section 60.142 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) DISPOSAL OF HIGH-LEVEL RADIOACTIVE WASTES IN GEOLOGIC REPOSITORIES...

  1. 10 CFR 60.142 - Design testing.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... construction, a program for in situ testing of such features as borehole and shaft seals, backfill, and the... 10 Energy 2 2012-01-01 2012-01-01 false Design testing. 60.142 Section 60.142 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) DISPOSAL OF HIGH-LEVEL RADIOACTIVE WASTES IN GEOLOGIC REPOSITORIES...

  2. 10 CFR 60.142 - Design testing.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... construction, a program for in situ testing of such features as borehole and shaft seals, backfill, and the... 10 Energy 2 2014-01-01 2014-01-01 false Design testing. 60.142 Section 60.142 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) DISPOSAL OF HIGH-LEVEL RADIOACTIVE WASTES IN GEOLOGIC REPOSITORIES...

  3. 10 CFR 60.142 - Design testing.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... construction, a program for in situ testing of such features as borehole and shaft seals, backfill, and the... 10 Energy 2 2011-01-01 2011-01-01 false Design testing. 60.142 Section 60.142 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) DISPOSAL OF HIGH-LEVEL RADIOACTIVE WASTES IN GEOLOGIC REPOSITORIES...

  4. New generation mix-designs : laboratory testing and construction of the APT test sections.

    DOT National Transportation Integrated Search

    2010-03-01

    Recent changes to the Texas HMA mix-design procedures such as adaption of the higher PG asphalt-binder grades and the Hamburg test have ensured that the mixes routinely used on the Texas highways are not prone to rutting. However, performance concern...

  5. On Designing Construct Driven Situational Judgment Tests: Some Preliminary Recommendations

    ERIC Educational Resources Information Center

    Guenole, Nigel; Chernyshenko, Oleksandr S.; Weekly, Jeff

    2017-01-01

    Situational judgment tests (SJTs) are widely agreed to be a measurement technique. It is also widely agreed that SJTs are a questionable methodological choice for measurement of psychological constructs, such as behavioral competencies, due to a lack of evidence supporting appropriate factor structures and high internal consistencies.…

  6. Structural and Functional Analysis of the Six1 Transcriptional Complex for Anti-Breast Cancer Drug Design

    DTIC Science & Technology

    2010-04-30

    scrambled controls. Responsiveness was tested using luciferase activity of the 3TP reporter construct and normalized to renilla activity. Data points...was tested using luciferase activity of the TOP-flash reporter construct and normalized to renilla activity. Data points for fractionation and

  7. The Development of a Model for Construction of Criterion Referenced System Achievement Tests for the Strategic Weapon System Training Program.

    ERIC Educational Resources Information Center

    Cantor, Jeffrey A.; Hobson, Edward N.

    The development of a test design methodology used to construct a criterion-referenced System Achievement Test (CR-SAT) for selected Naval enlisted classification (NEC) in the Strategic Weapon System (SWS) of the United States Navy is described. Subject matter experts, training data analysts and educational specialists developed a comprehensive…

  8. An ANSERLIN array for mobile satellite applications

    NASA Technical Reports Server (NTRS)

    Colomb, F. Y.; Kunkee, D. B.; Mayes, P. E.; Smith, D. W.; Jamnejad, V.

    1990-01-01

    Design, analysis, construction, and test of linear arrays of ANSERLIN (annular sector, radiating line) elements are reported and discussed. Due to feeding simplicity and easy construction as well as good CP performance, a planar array composed of a number of such linear arrays each producing a shaped beam tilted in elevation, is a good candidate as a vehicle-mounted mechanically steered antenna for mobile satellite applications. A single level construction technique was developed that makes this type of array very cost competitive with other low-profile arrays. An asymmetric 19.5 inch long four-element array was fabricated and tested with reasonable performance. A smaller five-element symmetric array (16 inch long) was also designed and tested capable of operating in either sense of circular polarization. Efforts were made to successfully reduce this effect.

  9. Survey of Experience Using Reinforced Concrete in Floating Marine Structures.

    DTIC Science & Technology

    1983-01-01

    organizations involved in materials research and testing . The second largest group consists of those involved in design, consulting, and construction...This distribution is consistent with the open literature where the majority of articles are concerned with materials research, testing , and design. Only...example, organizations involved in materials research, design, testing , and certification were visited in the Netherlands, France, Norway, Scotland, and

  10. A Quasi-Experimental Study of Two Selected Units of the Industrial Arts Curriculum Project Materials to Determine the Measurable Additive Effects of a Unit on Design in Manfacturing Technology upon a Similar Unit on Design in Construction Technology.

    ERIC Educational Resources Information Center

    Kuwik, Paul David

    The purpose of the study was to determine whether exposing junior high school students to a unit on design in construction technology and to a unit on design in manufacturing technology significantly affects their achievement on a test measuring "Technological Principles of Design" when compared to a group of junior high school students exposed…

  11. Examining Two Strategies to Link Mixed-Format Tests Using Multiple-Choice Anchors. Research Report. ETS RR-10-18

    ERIC Educational Resources Information Center

    Walker, Michael E.; Kim, Sooyeon

    2010-01-01

    This study examined the use of an all multiple-choice (MC) anchor for linking mixed format tests containing both MC and constructed-response (CR) items, in a nonequivalent groups design. An MC-only anchor could effectively link two such test forms if either (a) the MC and CR portions of the test measured the same construct, so that the MC anchor…

  12. Geotechnical Centrifuge Experiments to Evaluate Piping in Foundation Soils

    DTIC Science & Technology

    2014-05-01

    verifiable results. These tests were successful in design , construction, and execution of a realistic simulation of internal erosion leading to failure...possible “scale effects,” “modeling of models” testing protocol should be included in the test program. Also, the model design should minimize the scale...recommendations for improving the centrifuge tests include the following: • Design improved system for reservoir control to provide definitive and

  13. Construction Of Critical Thinking Skills Test Instrument Related The Concept On Sound Wave

    NASA Astrophysics Data System (ADS)

    Mabruroh, F.; Suhandi, A.

    2017-02-01

    This study aimed to construct test instrument of critical thinking skills of high school students related the concept on sound wave. This research using a mixed methods with sequential exploratory design, consists of: 1) a preliminary study; 2) design and review of test instruments. The form of test instruments in essay questions, consist of 18 questions that was divided into 5 indicators and 8 sub-indicators of the critical thinking skills expressed by Ennis, with questions that are qualitative and contextual. Phases of preliminary study include: a) policy studies; b) survey to the school; c) and literature studies. Phases of the design and review of test instruments consist of two steps, namely a draft design of test instruments include: a) analysis of the depth of teaching materials; b) the selection of indicators and sub-indicators of critical thinking skills; c) analysis of indicators and sub-indicators of critical thinking skills; d) implementation of indicators and sub-indicators of critical thinking skills; and e) making the descriptions about the test instrument. In the next phase of the review test instruments, consist of: a) writing about the test instrument; b) validity test by experts; and c) revision of test instruments based on the validator.

  14. GROWING ALTERNATIVE SUSTAINABLE BUILDINGS: BIO-COMPOSITE PRODUCTS FROM NATURAL FIBER, BIODEGRADABLE AND RECYCLABLE POLYMER MATERIALS FOR LOAD-BEARING CONSTRUCTION COMPONENTS

    EPA Science Inventory

    The project is an integrative educational and research project that will revolutionize design and construction methods towards more sustainable buildings. The project will develop and test new product design concepts using bio-composite materials in load-bearing and fa&cced...

  15. Developing design methods of concrete mix with microsilica additives for road construction

    NASA Astrophysics Data System (ADS)

    Dmitrienko, Vladimir; Shrivel, Igor; Kokunko, Irina; Pashkova, Olga

    2017-10-01

    Based on the laboratory test results, regression equations having standard cone and concrete strength, to determine the available amount of cement, water and microsilica were obtained. The joint solution of these equations allowed the researchers to develop the algorithm of designing heavy concrete compositions with microsilica additives for road construction.

  16. Development of a current collection loss management system for SDI homopolar power supplies

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Brown, D.W.

    1989-01-01

    High speed, high power density current collection systems have been identified as an enabling technology required to construct homopolar power supplies to meet SDI missions. This work is part of a three-year effort directed towards the analysis, experimental verification, and prototype construction of a current collection system designed to operate continuously at 2 kA/cm{sup 2}, at a rubbing speed of 200 m/s, and with acceptable losses in a space environment. To data, no system has achieved these conditions simultaneously. This is the annual report covering the second year period of performance on DOE contract DE-AC03-86SF16518. Major areas covered include design,more » construction and operation of a cryogenically cooled brush test rig, design and construction of a high speed brush test rig, optimization study for homopolar machines, loss analysis of the current collection system, and an application study which defines the air-core homopolar construction necessary to achieve the goal of 80--90 kW/kg generator power density. 17 figs., 2 tabs.« less

  17. Elementary students' engagement in failure-prone engineering design tasks

    NASA Astrophysics Data System (ADS)

    Andrews, Chelsea Joy

    Although engineering education has been practiced at the undergraduate level for over a century, only fairly recently has the field broadened to include the elementary level; the pre-college division of the American Society of Engineering Education was established in 2003. As a result, while recent education standards require engineering in elementary schools, current studies are still filling in basic research on how best to design and implement elementary engineering activities. One area in need of investigation is how students engage with physical failure in design tasks. In this dissertation, I explore how upper elementary students engage in failure-prone engineering design tasks in an out-of-school environment. In a series of three empirical case studies, I look closely at how students evaluate failed tests and decide on changes to their design constructions, how their reasoning evolves as they repeatedly encounter physical failure, and how students and facilitators co-construct testing norms where repetitive failure is manageable. I also briefly investigate how students' engagement differs in a task that features near-immediate success. By closely examining student groups' discourse and their interactions with their design constructions, I found that these students: are able to engage in iteration and see failure-as-feedback with minimal externally-imposed structure; seem to be designing in a more sophisticated manner, attending to multiple causal factors, after experiencing repetitive failure; and are able to manage the stress and frustration of repetitive failure, provided the co-constructed testing norms of the workshop environment are supportive of failure management. These results have both pedagogical implications, in terms of how to create and facilitate design tasks, and methodological implications--namely, I highlight the particular insights afforded by a case study approach for analyzing engagement in design tasks.

  18. Design and Installation of a Disposal Cell Cover Field Test

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Benson, C.H.; Waugh, W.J.; Albright, W.H.

    2011-02-27

    The U.S. Department of Energy’s Office of Legacy Management (LM) initiated a cover assessment project in September 2007 to evaluate an inexpensive approach to enhancing the hydrological performance of final covers for disposal cells. The objective is to accelerate and enhance natural processes that are transforming existing conventional covers, which rely on low-conductivity earthen barriers, into water balance covers, that store water in soil and release it as soil evaporation and plant transpiration. A low conductivity cover could be modified by deliberately blending the upper layers of the cover profile and planting native shrubs. A test facility was constructed atmore » the Grand Junction, Colorado, Disposal Site to evaluate the proposed methodology. The test cover was constructed in two identical sections, each including a large drainage lysimeter. The test cover was constructed with the same design and using the same materials as the existing disposal cell in order to allow for a direct comparison of performance. One test section will be renovated using the proposed method; the other is a control. LM is using the lysimeters to evaluate the effectiveness of the renovation treatment by monitoring hydrologic conditions within the cover profile as well as all water entering and leaving the system. This paper describes the historical experience of final covers employing earthen barrier layers, the design and operation of the lysimeter test facility, testing conducted to characterize the as-built engineering and edaphic properties of the lysimeter soils, the calibration of instruments installed at the test facility, and monitoring data collected since the lysimeters were constructed.« less

  19. A toolbox and record for scientific models

    NASA Technical Reports Server (NTRS)

    Ellman, Thomas

    1994-01-01

    Computational science presents a host of challenges for the field of knowledge-based software design. Scientific computation models are difficult to construct. Models constructed by one scientist are easily misapplied by other scientists to problems for which they are not well-suited. Finally, models constructed by one scientist are difficult for others to modify or extend to handle new types of problems. Construction of scientific models actually involves much more than the mechanics of building a single computational model. In the course of developing a model, a scientist will often test a candidate model against experimental data or against a priori expectations. Test results often lead to revisions of the model and a consequent need for additional testing. During a single model development session, a scientist typically examines a whole series of alternative models, each using different simplifying assumptions or modeling techniques. A useful scientific software design tool must support these aspects of the model development process as well. In particular, it should propose and carry out tests of candidate models. It should analyze test results and identify models and parts of models that must be changed. It should determine what types of changes can potentially cure a given negative test result. It should organize candidate models, test data, and test results into a coherent record of the development process. Finally, it should exploit the development record for two purposes: (1) automatically determining the applicability of a scientific model to a given problem; (2) supporting revision of a scientific model to handle a new type of problem. Existing knowledge-based software design tools must be extended in order to provide these facilities.

  20. Ultra-dense magnetoresistive mass memory

    NASA Technical Reports Server (NTRS)

    Daughton, J. M.; Sinclair, R.; Dupuis, T.; Brown, J.

    1992-01-01

    This report details the progress and accomplishments of Nonvolatile Electronics (NVE), Inc., on the design of the wafer scale MRAM mass memory system during the fifth quarter of the project. NVE has made significant progress this quarter on the one megabit design in several different areas. A test chip, which will verify a working GMR bit with the dimensions required by the 1 Meg chip, has been designed, laid out, and is currently being processed in the NVE labs. This test chip will allow electrical specifications, tolerances, and processing issues to be finalized before construction of the actual chip, thus providing a greater assurance of success of the final 1 Meg design. A model has been developed to accurately simulate the parasitic effects of unselected sense lines. This model gives NVE the ability to perform accurate simulations of the array electronic and test different design concepts. Much of the circuit design for the 1 Meg chip has been completed and simulated and these designs are included. Progress has been made in the wafer scale design area to verify the reliable operation of the 16 K macrocell. This is currently being accomplished with the design and construction of two stand alone test systems which will perform life tests and gather data on reliabiliy and wearout mechanisms for analysis.

  1. Around Marshall

    NASA Image and Video Library

    1963-09-18

    At its founding, the Marshall Space Flight Center (MSFC) inherited the Army’s Jupiter and Redstone test stands, but much larger facilities were needed for the giant stages of the Saturn V. From 1960 to 1964, the existing stands were remodeled and a sizable new test area was developed. The new comprehensive test complex for propulsion and structural dynamics was unique within the nation and the free world, and they remain so today because they were constructed with foresight to meet the future as well as on going needs. Construction of the S-IC Static test stand complex began in 1961 in the west test area of MSFC, and was completed in 1964. The S-IC static test stand was designed to develop and test the 138-ft long and 33-ft diameter Saturn V S-IC first stage, or booster stage, weighing in at 280,000 pounds. Required to hold down the brute force of a 7,500,000-pound thrust produced by 5 F-1 engines, the S-IC static test stand was designed and constructed with the strength of hundreds of tons of steel and 12,000,000 pounds of cement, planted down to bedrock 40 feet below ground level. The foundation walls, constructed with concrete and steel, are 4 feet thick. The base structure consists of four towers with 40-foot-thick walls extending upward 144 feet above ground level. The structure was topped by a crane with a 135-foot boom. With the boom in the upright position, the stand was given an overall height of 405 feet, placing it among the highest structures in Alabama at the time. In addition to the stand itself, related facilities were constructed during this time. This photograph taken September 18, 1963 shows a spherical hydrogen tank being constructed next to the S-IC test stand.

  2. 33 CFR 159.101 - Testing: general.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ...) POLLUTION MARINE SANITATION DEVICES Design, Construction, and Testing § 159.101 Testing: general. Unless... vessel in accordance with the manufacturer's instructions with respect to mounting, water supply, and...

  3. Design, construction, and field testing of an ultra high performance concrete pi-girder bridge.

    DOT National Transportation Integrated Search

    2011-01-01

    The Jakway Park Bridge in Buchanan County, Iowa is the first bridge constructed with a new prestesssed girder system composed of : precast Ultra-High Performance Concrete (UHPC). These girders employ an integral deck to facilitate construction and ar...

  4. Design, Development and Testing of Airplanes for Mars Exploration

    NASA Technical Reports Server (NTRS)

    Hall, David W.

    2004-01-01

    The opportunity for a piggyback mission to Mars aboard an Ariane 5 rocket in the early spring of 1999 set off feverish design activity at several NASA centers. This report describes the contract work done by faculty, students, and consultants at the California Polytechnic State University in San Luis Obispo California (Cal poly/SLO) to support the NASA/Ames design, construction and test efforts to develop a simple and robust Mars Flyer configuration capable of performing a practical science mission on Mars. The first sections will address the conceptual design of a workable Mars Flyer configuration which started in the spring and summer of 1999. The following sections will focus on construction and flight test of two full-scale vehicles. The final section will reflect on the overall effort and make recommendations for future work.

  5. Genetic and Environmental Influences of General Cognitive Ability: Is g a valid latent construct?

    PubMed Central

    Panizzon, Matthew S.; Vuoksimaa, Eero; Spoon, Kelly M.; Jacobson, Kristen C.; Lyons, Michael J.; Franz, Carol E.; Xian, Hong; Vasilopoulos, Terrie; Kremen, William S.

    2014-01-01

    Despite an extensive literature, the “g” construct remains a point of debate. Different models explaining the observed relationships among cognitive tests make distinct assumptions about the role of g in relation to those tests and specific cognitive domains. Surprisingly, these different models and their corresponding assumptions are rarely tested against one another. In addition to the comparison of distinct models, a multivariate application of the twin design offers a unique opportunity to test whether there is support for g as a latent construct with its own genetic and environmental influences, or whether the relationships among cognitive tests are instead driven by independent genetic and environmental factors. Here we tested multiple distinct models of the relationships among cognitive tests utilizing data from the Vietnam Era Twin Study of Aging (VETSA), a study of middle-aged male twins. Results indicated that a hierarchical (higher-order) model with a latent g phenotype, as well as specific cognitive domains, was best supported by the data. The latent g factor was highly heritable (86%), and accounted for most, but not all, of the genetic effects in specific cognitive domains and elementary cognitive tests. By directly testing multiple competing models of the relationships among cognitive tests in a genetically-informative design, we are able to provide stronger support than in prior studies for g being a valid latent construct. PMID:24791031

  6. Load Testing, Finite Element Analysis, and Design of Steel Traffic-Signal Poles

    DOT National Transportation Integrated Search

    1993-07-01

    At request of the Structures Design and Construction Division, the Engineering Research and Development Bureau performed full-scale testing and finite element analysis (FEA) of span-wire traffic-signal poles to evaluate their structural adequacy. Res...

  7. Design and construction of the MicroBooNE detector

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Acciarri, R.; Adams, C.; An, R.

    This paper describes the design and construction of the MicroBooNE liquid argon time projection chamber and associated systems. MicroBooNE is the first phase of the Short Baseline Neutrino program, located at Fermilab, and will utilize the capabilities of liquid argon detectors to examine a rich assortment of physics topics. In this document details of design specifications, assembly procedures, and acceptance tests are reported.

  8. Design and construction of the MicroBooNE detector

    DOE PAGES

    Acciarri, R.; Adams, C.; An, R.; ...

    2017-02-01

    This paper describes the design and construction of the MicroBooNE liquid argon time projection chamber and associated systems. MicroBooNE is the first phase of the Short Baseline Neutrino program, located at Fermilab, and will utilize the capabilities of liquid argon detectors to examine a rich assortment of physics topics. In this document details of design specifications, assembly procedures, and acceptance tests are reported.

  9. The Construction of a Muscular Strength Test Battery for Girls in the Primary Grades.

    ERIC Educational Resources Information Center

    DiNucci, James M.; Pelton, Elois B.

    This study was designed to construct a gross muscular strength test battery for girls 6-9 years of age in grades 1-3. The subjects for this investigation were a random sample of 183 girls in grades 1-3 of the public schools of Natchitoches, Louisiana. The variables selected were 22 cable tension strength tests developed by Clarke and associates.…

  10. Construction and Initial Tests of MAIZE: 1 MA LTD-Driven Z-Pinch *

    NASA Astrophysics Data System (ADS)

    Gilgenbach, R. M.; Gomez, M. R.; Zier, J. C.; Tang, W.; French, D. M.; Lau, Y. Y.; Mazarakis, M. G.; Cuneo, M. E.; Johnston, M. D.; Oliver, B. V.; Mehlhorn, T. A.; Kim, A. A.; Sinebryukhov, V. A.

    2008-11-01

    We report construction and initial testing of a 1-MA Linear Transformer Driver (LTD), The Michigan Accelerator for Inductive Z-pinch Experiments, (MAIZE). This machine, the first of its type to reach the USA, is based on the joint HCEI, Sandia Laboratories, and UM development effort. The compact LTD uses 80 capacitors and 40 spark gap switches, in 40 ``bricks'', to deliver 1 MA, 100 kV pulses with 70 ns risetime into a matched resistive load. Test results will be presented for a single brick and the full LTD. Design and construction will be presented of a low-inductance MITL. Experimental research programs under design and construction at UM include: a) Studies of Magneto-Raleigh-Taylor Instability of planar foils, and b) Vacuum convolute studies including cathode and anode plasma. Theory and simulation results will be presented for these planned experiments. Initial experimental designs and moderate-current feasibility experiments will be discussed. *Research supported by U. S. DoE through Sandia National Laboratories award document numbers 240985, 768225, 790791 and 805234 to the UM. MRG supported by NNSA Fellowship and JCZ supported by NPSC Fellowship / Sandia National Labs.

  11. Simulator test to study hot-flow problems related to a gas cooled reactor

    NASA Technical Reports Server (NTRS)

    Poole, J. W.; Freeman, M. P.; Doak, K. W.; Thorpe, M. L.

    1973-01-01

    An advance study of materials, fuel injection, and hot flow problems related to the gas core nuclear rocket is reported. The first task was to test a previously constructed induction heated plasma GCNR simulator above 300 kW. A number of tests are reported operating in the range of 300 kW at 10,000 cps. A second simulator was designed but not constructed for cold-hot visualization studies using louvered walls. A third task was a paper investigation of practical uranium feed systems, including a detailed discussion of related problems. The last assignment resulted in two designs for plasma nozzle test devices that could be operated at 200 atm on hydrogen.

  12. An Empirical Comparison of Methods for Equating with Randomly Equivalent Groups of 50 to 400 Test Takers. Research Report. ETS RR-10-05

    ERIC Educational Resources Information Center

    Livingston, Samuel A.; Kim, Sooyeon

    2010-01-01

    A series of resampling studies investigated the accuracy of equating by four different methods in a random groups equating design with samples of 400, 200, 100, and 50 test takers taking each form. Six pairs of forms were constructed. Each pair was constructed by assigning items from an existing test taken by 9,000 or more test takers. The…

  13. Design of an autonomous Lunar construction utility vehicle

    NASA Technical Reports Server (NTRS)

    Ash, Robert L.; Chew, Mason; Dixon, Iain (Editor)

    1990-01-01

    In order to prepare a site for a manned lunar base, an autonomously operated construction vehicle is necessary. A Lunar Construction Utility Vehicle (LCUV), which utilizes interchangeable construction implements, was designed conceptually. Some elements of the machine were studied in greater detail. Design of an elastic loop track system has advanced to the testing stage. A standard coupling device was designed to insure a proper connection between the different construction tools and the LCUV. Autonomous control of the track drive motors was simulated successfully through the use of a joystick and computer interface. A study of hydrogen-oxygen fuel cells has produced estimates of reactant and product size requirements and identified multi-layer insulation techniques. Research on a 100 kW heat rejection system has determined that it is necessary to house a radiator panel on a utility trailer. The impact of a 720 hr use cycle has produced a very large logistical support lien which requires further study.

  14. Upscaling the pollutant emission from mixed recycled aggregates under compaction for civil applications.

    PubMed

    Galvín, Adela P; Ayuso, Jesús; Barbudo, Auxi; Cabrera, Manuel; López-Uceda, Antonio; Rosales, Julia

    2017-12-27

    In general terms, plant managers of sites producing construction wastes assess materials according to concise, legally recommended leaching tests that do not consider the compaction stage of the materials when they are applied on-site. Thus, the tests do not account for the real on-site physical conditions of the recycled aggregates used in civil works (e.g., roads or embankments). This leads to errors in estimating the pollutant potential of these materials. For that reason, in the present research, an experimental procedure is designed as a leaching test for construction materials under compaction. The aim of this laboratory test (designed specifically for the granular materials used in civil engineering infrastructures) is to evaluate the release of pollutant elements when the recycled aggregate is tested at its commercial grain-size distribution and when the material is compacted under on-site conditions. Two recycled aggregates with different gypsum contents (0.95 and 2.57%) were used in this study. In addition to the designed leaching laboratory test, the conventional compliance leaching test and the Dutch percolation test were performed. The results of the new leaching method were compared with the conventional leaching test results. After analysis, the chromium and sulphate levels obtained from the newly designed test were lower than those obtained from the conventional leaching test, and these were considered more seriously pollutant elements. This result confirms that when the leaching behaviour is evaluated for construction aggregates without density alteration, crushing the aggregate and using only the finest fraction, as is done in the conventional test (which is an unrealistic situation for aggregates that are applied under on-site conditions), the leaching behaviour is not accurately assessed.

  15. Around Marshall

    NASA Image and Video Library

    1962-07-03

    At its founding, the Marshall Space Flight Center (MSFC) inherited the Army’s Jupiter and Redstone test stands, but much larger facilities were needed for the giant stages of the Saturn V. From 1960 to 1964, the existing stands were remodeled and a sizable new test area was developed. The new comprehensive test complex for propulsion and structural dynamics was unique within the nation and the free world, and they remain so today because they were constructed with foresight to meet the future as well as on going needs. Construction of the S-IC Static test stand complex began in 1961 in the west test area of MSFC, and was completed in 1964. The S-IC static test stand was designed to develop and test the 138-ft long and 33-ft diameter Saturn V S-IC first stage, or booster stage, weighing in at 280,000 pounds. Required to hold down the brute force of a 7,500,000-pound thrust produced by 5 F-1 engines, the S-IC static test stand was designed and constructed with the strength of hundreds of tons of steel and 12,000,000 pounds of cement, planted down to bedrock 40 feet below ground level. The foundation walls, constructed with concrete and steel, are 4 feet thick. The base structure consists of four towers with 40-foot-thick walls extending upward 144 feet above ground level. The structure was topped by a crane with a 135-foot boom. With the boom in the upright position, the stand was given an overall height of 405 feet, placing it among the highest structures in Alabama at the time. In addition to the stand itself, related facilities were constructed during this time. North of the massive S-IC test stand, the F-1 Engine test stand was built. Designed to assist in the development of the F-1 Engine, the F-1 test stand is a vertical engine firing test stand, 239 feet in elevation and 4,600 square feet in area at the base. Capability was provided for static firing of 1.5 million pounds of thrust using liquid oxygen and kerosene. Like the S-IC stand, the foundation of the F-1 stand is keyed into the bedrock approximately 40 feet below grade. This photo depicts the construction of the F-1 test stand as of July 3, 1963. All four of its tower legs are well underway.

  16. Around Marshall

    NASA Image and Video Library

    1963-09-05

    At its founding, the Marshall Space Flight Center (MSFC) inherited the Army’s Jupiter and Redstone test stands, but much larger facilities were needed for the giant stages of the Saturn V. From 1960 to 1964, the existing stands were remodeled and a sizable new test area was developed. The new comprehensive test complex for propulsion and structural dynamics was unique within the nation and the free world, and they remain so today because they were constructed with foresight to meet the future as well as on going needs. Construction of the S-IC Static test stand complex began in 1961 in the west test area of MSFC, and was completed in 1964. The S-IC static test stand was designed to develop and test the 138-ft long and 33-ft diameter Saturn V S-IC first stage, or booster stage, weighing in at 280,000 pounds. Required to hold down the brute force of a 7,500,000-pound thrust produced by 5 F-1 engines, the S-IC static test stand was designed and constructed with the strength of hundreds of tons of steel and 12,000,000 pounds of cement, planted down to bedrock 40 feet below ground level. The foundation walls, constructed with concrete and steel, are 4 feet thick. The base structure consists of four towers with 40-foot-thick walls extending upward 144 feet above ground level. The structure was topped by a crane with a 135-foot boom. With the boom in the upright position, the stand was given an overall height of 405 feet, placing it among the highest structures in Alabama at the time. In addition to the stand itself, related facilities were constructed during this time. North of the massive S-IC test stand, the F-1 Engine test stand was built. Designed to assist in the development of the F-1 Engine, the F-1 test stand is a vertical engine firing test stand, 239 feet in elevation and 4,600 square feet in area at the base. Capability was provided for static firing of 1.5 million pounds of thrust using liquid oxygen and kerosene. Like the S-IC stand, the foundation of the F-1 stand is keyed into the bedrock approximately 40 feet below grade. This photo depicts the construction of the F-1 test stand as of September 5, 1963.

  17. Around Marshall

    NASA Image and Video Library

    1963-09-30

    At its founding, the Marshall Space Flight Center (MSFC) inherited the Army’s Jupiter and Redstone test stands, but much larger facilities were needed for the giant stages of the Saturn V. From 1960 to 1964, the existing stands were remodeled and a sizable new test area was developed. The new comprehensive test complex for propulsion and structural dynamics was unique within the nation and the free world, and they remain so today because they were constructed with foresight to meet the future as well as on going needs. Construction of the S-IC Static test stand complex began in 1961 in the west test area of MSFC, and was completed in 1964. The S-IC static test stand was designed to develop and test the 138-ft long and 33-ft diameter Saturn V S-IC first stage, or booster stage, weighing in at 280,000 pounds. Required to hold down the brute force of a 7,500,000-pound thrust produced by 5 F-1 engines, the S-IC static test stand was designed and constructed with the strength of hundreds of tons of steel and 12,000,000 pounds of cement, planted down to bedrock 40 feet below ground level. The foundation walls, constructed with concrete and steel, are 4 feet thick. The base structure consists of four towers with 40-foot-thick walls extending upward 144 feet above ground level. The structure was topped by a crane with a 135-foot boom. With the boom in the upright position, the stand was given an overall height of 405 feet, placing it among the highest structures in Alabama at the time. In addition to the stand itself, related facilities were constructed during this time. North of the massive S-IC test stand, the F-1 Engine test stand was built. Designed to assist in the development of the F-1 Engine, the F-1 test stand is a vertical engine firing test stand, 239 feet in elevation and 4,600 square feet in area at the base. Capability was provided for static firing of 1.5 million pounds of thrust using liquid oxygen and kerosene. Like the S-IC stand, the foundation of the F-1 stand is keyed into the bedrock approximately 40 feet below grade. This photo depicts the construction of the F-1 test stand as of September 30, 1963.

  18. Around Marshall

    NASA Image and Video Library

    1963-06-24

    At its founding, the Marshall Space Flight Center (MSFC) inherited the Army’s Jupiter and Redstone test stands, but much larger facilities were needed for the giant stages of the Saturn V. From 1960 to 1964, the existing stands were remodeled and a sizable new test area was developed. The new comprehensive test complex for propulsion and structural dynamics was unique within the nation and the free world, and they remain so today because they were constructed with foresight to meet the future as well as on going needs. Construction of the S-IC Static test stand complex began in 1961 in the west test area of MSFC, and was completed in 1964. The S-IC static test stand was designed to develop and test the 138-ft long and 33-ft diameter Saturn V S-IC first stage, or booster stage, weighing in at 280,000 pounds. Required to hold down the brute force of a 7,500,000-pound thrust produced by 5 F-1 engines, the S-IC static test stand was designed and constructed with the strength of hundreds of tons of steel and 12,000,000 pounds of cement, planted down to bedrock 40 feet below ground level. The foundation walls, constructed with concrete and steel, are 4 feet thick. The base structure consists of four towers with 40-foot-thick walls extending upward 144 feet above ground level. The structure was topped by a crane with a 135-foot boom. With the boom in the upright position, the stand was given an overall height of 405 feet, placing it among the highest structures in Alabama at the time. In addition to the stand itself, related facilities were constructed during this time. North of the massive S-IC test stand, the F-1 Engine test stand was built. Designed to assist in the development of the F-1 Engine, the F-1 test stand is a vertical engine firing test stand, 239 feet in elevation and 4,600 square feet in area at the base. Capability was provided for static firing of 1.5 million pounds of thrust using liquid oxygen and kerosene. Like the S-IC stand, the foundation of the F-1 stand is keyed into the bedrock approximately 40 feet below grade. This photo depicts the construction of the F-1 test stand as of June 24, 1963. Two if its four tower legs are underway.

  19. Lightning protection of the Fokker 100 CFRP rudder

    NASA Technical Reports Server (NTRS)

    Ruiter, A. J. M.

    1991-01-01

    The construction of the structural parts of the Fokker 100 CFRP rudder is described with respect to the requirements for electrical bonding and lightning protection. Furthermore, the philosophy for the selection of a consumable trailing edge is given. A description of possible alternative designs for trailing edges and their advantages and disadvantages with respect to damage after lightning impact will also be reviewed. An overview of the tests performed on test samples and the rudder construction are presented and discussed. The effectiveness of both the selected structural provisions and trailing edge are described (and proven) by reporting the results of the simulated lightning tests performed. Proof is given that the trailing edge construction and its bonding through the structural parts of the rudder to the main aircraft structure is a solution which results in minor damage to the rudder after lightning impact. Furthermore, it is shown that the selected trailing edge construction is less favored by the structural designers due to the weight penalty.

  20. The orbiter mate/demate device

    NASA Technical Reports Server (NTRS)

    Miller, A. J.; Binkley, W. H.

    1985-01-01

    The numerous components and systems of the space shuttle orbiter mate/demate device (MDD) are discussed. Special emphasis is given, mechanisms and mechanical systems to discuss in general their requirements, functions, and design; and, where applicable, to relate any unusual problems encountered during the initial concept studies, final design, and construction are discussed. The MDD and its electrical, machinery, and mechanical systems, including the main hoisting system, power operated access service platform, wind restrain and adjustment mechanism, etc., were successfully designed and constructed. The MDD was used routinely during the initial orbiter-747 approach and landing test and the more recent orbiter flight tests recovery and mate operations.

  1. Building a Straw Bridge

    ERIC Educational Resources Information Center

    Teaching Science, 2015

    2015-01-01

    This project is for a team of students (groups of two or three are ideal) to design and construct a model of a single-span bridge, using plastic drinking straws as the building material. All steps of the design, construction, testing and critiquing stages should be recorded by students in a journal. Students may like to include labelled diagrams,…

  2. A One-Piece Lunar Regolith Bag Garage Prototype

    NASA Technical Reports Server (NTRS)

    Smithers, G. A.; Nehls, M. K.; Hovater, M. A.; Evans, S. W.; Miller, J. S.; Broughton, R. M., Jr.; Beale, D.; Kilinc-Balci, F.

    2007-01-01

    Shelter structures on the moon, even in early phases of exploration, should incorporate lunar materials as much as possible. This Technical Memorandum details the design and construction of a prototype for a one-piece regolith bag unpressurized garage concept and a materials testing program to investigate six candidate fabrics to learn how they might perform in the lunar environment. The conceptualization was that a lightweight fabric form be launched from Earth and landed on the lunar surface to be robotically filled with raw lunar regolith. Regolith bag fabric candidates included: Vectran(TM), Nextel(TM), Gore PTFE Fabric(TM), Zylon(TM), Twaron(TM), and Nomex(TM). Tensile (including post radiation exposure), fold, abrasion, and hypervelocity impact testing were performed under ambient conditions, and also performed under cold and elevated temperatures. In some cases, Johnson Space Center lunar simulant (JSC-1) was used in conjunction with testing. A series of preliminary structures was constructed during final prototype design based on the principles of the classic masonry arch. The prototype was constructed of Kevlar(TM) and filled with vermiculite. The structure is free-standing, but has not yet been load tested. Future plans would be to construct higher fidelity prototypes and to conduct appropriate tests of the structure.

  3. Structural Solutions for Low-Cost Bamboo Frames: Experimental Tests and Constructive Assessments

    PubMed Central

    Sassu, Mauro; De Falco, Anna; Giresini, Linda; Puppio, Mario Lucio

    2016-01-01

    Experimental tests and constructive assessments are presented for a simple bamboo framed structure with innovative low-cost and low technology joints, specifically conceived for small buildings in developing countries. Two full scale one-storey bamboo frames have been designed by using the simplest joints solution among three different tested typologies. The entire building process is based on low-technology and natural materials: bamboo canes, wooden cylinders, plywood plates and canapé rods. The first full scale specimen (Unit A) is a one-storey single deck truss structure subjected to monotonic collapse test; the second full scale specimen (Unit B) is a one-storey double deck truss structure used to evaluate the construction time throughout assembling tests. The first full scale specimen showed ductility in collapse and ease in strengthening; the second one showed remarkable ease and speed in assembling structural elements. Finally several constructive solutions are suggested for the design of simple one-storey buildings; they are addressed to four purposes (housing, school, chapel, health center) by the composition of the proposed full scale bamboo frames. Ease of use and maintenance with a low level of technology contribute to application in developing countries although not exclusively. PMID:28773472

  4. Gasification in pulverized coal flames. Second annual progress report, July 1976--August 1977. [Pulverized coal

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    George, P. E.; Lenzer, R. C.; Thomas, J. F.

    1977-08-01

    This project concerns the production of power and synthesis gases from pulverized coal via suspension gasification. Swirling flow in both concentric jet and cyclone gasifiers will separate oxidation and reduction zones. Gasifier performance will be correlated with internally measured temperature and concentration profiles. The test cell flow system and electrical system, which includes a safety interlock design, has been installed. Calibration of the UTI-30C mass spectrometer and construction of the gas sampling system are complete. Both the coal feeder, which has been calibrated, and the boiler are ready for integration into the test cell flow system. Construction and testing ofmore » the cyclone reactor, including methane combustion experiments, is complete. The confined jet reactor has been designed and construction is underway. Investigation of combustion and gasification modeling techniques has begun.« less

  5. The Functional and Developmental Organization of Cognitive Developmental Sequences

    ERIC Educational Resources Information Center

    Demetriou, Andreas; Kyriakides, Leonidas

    2006-01-01

    This study examines the organization and development of 5 domains of reasoning (categorical, quantitative, spatial, causal, and propositional) and the construct validity of a test designed to measure development from early adolescence to early adulthood. The theory underlying the test is first summarized and the conceptual design of the test is…

  6. Deep Borehole Field Test Requirements and Controlled Assumptions.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hardin, Ernest

    2015-07-01

    This document presents design requirements and controlled assumptions intended for use in the engineering development and testing of: 1) prototype packages for radioactive waste disposal in deep boreholes; 2) a waste package surface handling system; and 3) a subsurface system for emplacing and retrieving packages in deep boreholes. Engineering development and testing is being performed as part of the Deep Borehole Field Test (DBFT; SNL 2014a). This document presents parallel sets of requirements for a waste disposal system and for the DBFT, showing the close relationship. In addition to design, it will also inform planning for drilling, construction, and scientificmore » characterization activities for the DBFT. The information presented here follows typical preparations for engineering design. It includes functional and operating requirements for handling and emplacement/retrieval equipment, waste package design and emplacement requirements, borehole construction requirements, sealing requirements, and performance criteria. Assumptions are included where they could impact engineering design. Design solutions are avoided in the requirements discussion. Deep Borehole Field Test Requirements and Controlled Assumptions July 21, 2015 iv ACKNOWLEDGEMENTS This set of requirements and assumptions has benefited greatly from reviews by Gordon Appel, Geoff Freeze, Kris Kuhlman, Bob MacKinnon, Steve Pye, David Sassani, Dave Sevougian, and Jiann Su.« less

  7. Shielding analyses for repetitive high energy pulsed power accelerators

    NASA Astrophysics Data System (ADS)

    Jow, H. N.; Rao, D. V.

    Sandia National Laboratories (SNL) designs, tests and operates a variety of accelerators that generate large amounts of high energy Bremsstrahlung radiation over an extended time. Typically, groups of similar accelerators are housed in a large building that is inaccessible to the general public. To facilitate independent operation of each accelerator, test cells are constructed around each accelerator to shield it from the radiation workers occupying surrounding test cells and work-areas. These test cells, about 9 ft. high, are constructed of high density concrete block walls that provide direct radiation shielding. Above the target areas (radiation sources), lead or steel plates are used to minimize skyshine radiation. Space, accessibility and cost considerations impose certain restrictions on the design of these test cells. SNL Health Physics division is tasked to evaluate the adequacy of each test cell design and compare resultant dose rates with the design criteria stated in DOE Order 5480.11. In response, SNL Health Physics has undertaken an intensive effort to assess existing radiation shielding codes and compare their predictions against measured dose rates. This paper provides a summary of the effort and its results.

  8. KSC-2012-6405

    NASA Image and Video Library

    2012-09-20

    CAPE CANAVERAL, Fla. -- At NASA’s Kennedy Space Center in Florida, a groundbreaking was held to mark the start of construction on the Antenna Test Bed Array for the Ka-Band Objects Observation and Monitoring, or Ka-BOOM system. Using ceremonial shovels to mark the site, from left are Michael Le, lead design engineer and construction manager Sue Vingris, Cape Design Engineer Co. project manager Kannan Rengarajan, chief executive officer of Cape Design Engineer Co. Lutfi Mized, president of Cape Design Engineer Co. David Roelandt, construction site superintendent with Cape Design Engineer Co. Marc Seibert, NASA project manager Michael Miller, NASA project manager Peter Aragona, KSC’s Electromagnetic Lab manager Stacy Hopper, KSCs master planning supervisor Dr. Bary Geldzabler, NASA chief scientist and KSC’s Chief Technologist Karen Thompson. The construction site is near the former Vertical Processing Facility, which has been demolished. Workers will begin construction on the pile foundations for the 40-foot-diameter dish antenna arrays and their associated utilities, and prepare the site for the operations command center facility. Photo credit: NASA/Charisse Nahser

  9. KSC-2012-6404

    NASA Image and Video Library

    2012-09-20

    CAPE CANAVERAL, Fla. -- At NASA’s Kennedy Space Center in Florida, a groundbreaking was held to mark the start of construction on the Antenna Test Bed Array for the Ka-Band Objects Observation and Monitoring, or Ka-BOOM system. Holding ceremonial shovels, from left are Michael Le, lead design engineer and construction manager Sue Vingris, Cape Design Engineer Co. project manager Kannan Rengarajan, chief executive officer of Cape Design Engineer Co. Lutfi Mized, president of Cape Design Engineer Co. David Roelandt, construction site superintendent with Cape Design Engineer Co. Marc Seibert, NASA project manager Michael Miller, NASA project manager Peter Aragona, KSC’s Electromagnetic Lab manager Stacy Hopper, KSCs master planning supervisor Dr. Bary Geldzabler, NASA chief scientist and KSC’s Chief Technologist Karen Thompson. The construction site is near the former Vertical Processing Facility, which has been demolished. Workers will begin construction on the pile foundations for the 40-foot-diameter dish antenna arrays and their associated utilities, and prepare the site for the operations command center facility. Photo credit: NASA/Charisse Nahser

  10. 24 CFR 200.954 - Supplementary specific requirements under the HUD building product standard and certification...

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... under the HUD building product standard and certification program for construction adhesives for wood... program for construction adhesives for wood floor systems. (a) Applicable standards. (1) All construction adhesives for field glued wood floor systems shall be designed, manufactured, and tested in compliance with...

  11. 24 CFR 200.954 - Supplementary specific requirements under the HUD building product standard and certification...

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... under the HUD building product standard and certification program for construction adhesives for wood... program for construction adhesives for wood floor systems. (a) Applicable standards. (1) All construction adhesives for field glued wood floor systems shall be designed, manufactured, and tested in compliance with...

  12. 24 CFR 200.954 - Supplementary specific requirements under the HUD building product standard and certification...

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... under the HUD building product standard and certification program for construction adhesives for wood... program for construction adhesives for wood floor systems. (a) Applicable standards. (1) All construction adhesives for field glued wood floor systems shall be designed, manufactured, and tested in compliance with...

  13. Ice interaction with offshore structures

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Cammaert, A.B.; Muggeridge, D.B.

    1988-01-01

    Oil platforms and other offshore structures being built in the arctic regions must be able to withstand icebergs, ice islands, and pack ice. This reference explain the effect ice has on offshore structures and demonstrates design and construction methods that allow such structures to survive in harsh, ice-ridden environments. It analyzes the characteristics of sea ice as well as dynamic ice forces on structures. Techniques for ice modeling and field testing facilitate the design and construction of sturdy, offshore constructions. Computer programs included.

  14. Investigation of 14.5mm API Self-Sealing/Crashworthy Fuel Tank Material

    DTIC Science & Technology

    1974-09-01

    describes the results of a f-rogram for a crashworthy, 14.5mm API tolerant fuel cell construction developed and subjected co qualification testing. The...Paragraphs 4.6.6.4 and 4.6.6.5), which were not required by contract. Two fuel tanks were built of a construction designated by The Goodyear Tire & Rubber...TABLES 3 INTRODUCTION 4 FUEL TANK MATERIAL DESIGN STUDY (TASK I) 4 QUALIFIC/.TION OF CONSTRUCTION (TASK 11) ........ 5 FUEL TANK GUNFIRE 12

  15. A3 Subscale Diffuser Test Article Design

    NASA Technical Reports Server (NTRS)

    Saunders, G. P.

    2009-01-01

    This paper gives a detailed description of the design of the A3 Subscale Diffuser Test (SDT) Article Design. The subscale diffuser is a geometrically accurate scale model of the A3 altitude rocket facility. It was designed and built to support the SDT risk mitigation project located at the E3 facility at Stennis Space Center, MS (SSC) supporting the design and construction of the A3 facility at SSC. The subscale test article is outfitted with a large array of instrumentation to support the design verification of the A3 facility. The mechanical design of the subscale diffuser and test instrumentation are described here

  16. A newly developed tool for classifying study designs in systematic reviews of interventions and exposures showed substantial reliability and validity.

    PubMed

    Seo, Hyun-Ju; Kim, Soo Young; Lee, Yoon Jae; Jang, Bo-Hyoung; Park, Ji-Eun; Sheen, Seung-Soo; Hahn, Seo Kyung

    2016-02-01

    To develop a study Design Algorithm for Medical Literature on Intervention (DAMI) and test its interrater reliability, construct validity, and ease of use. We developed and then revised the DAMI to include detailed instructions. To test the DAMI's reliability, we used a purposive sample of 134 primary, mainly nonrandomized studies. We then compared the study designs as classified by the original authors and through the DAMI. Unweighted kappa statistics were computed to test interrater reliability and construct validity based on the level of agreement between the original and DAMI classifications. Assessment time was also recorded to evaluate ease of use. The DAMI includes 13 study designs, including experimental and observational studies of interventions and exposure. Both the interrater reliability (unweighted kappa = 0.67; 95% CI [0.64-0.75]) and construct validity (unweighted kappa = 0.63, 95% CI [0.52-0.67]) were substantial. Mean classification time using the DAMI was 4.08 ± 2.44 minutes (range, 0.51-10.92). The DAMI showed substantial interrater reliability and construct validity. Furthermore, given its ease of use, it could be used to accurately classify medical literature for systematic reviews of interventions although minimizing disagreement between authors of such reviews. Copyright © 2016 Elsevier Inc. All rights reserved.

  17. Academic Optimism and Collective Responsibility: An Organizational Model of the Dynamics of Student Achievement

    ERIC Educational Resources Information Center

    Wu, Jason H.

    2013-01-01

    This study was designed to examine the construct of academic optimism and its relationship with collective responsibility in a sample of Taiwan elementary schools. The construct of academic optimism was tested using confirmatory factor analysis, and the whole structural model was tested with a structural equation modeling analysis. The data were…

  18. Modeling of Mn/Road test sections with the CRREL mechanistic pavement design procedure

    DOT National Transportation Integrated Search

    1996-09-01

    The U.S. Army Cold Regions Research and Engineering Laboratory is developing a mechanistic pavement design procedure for use in seasonal frost areas. The procedure was used to predict pavement performance of some test sections under construction at t...

  19. DESIGN CRITERIA FOR HIGH TEMPERATURE LATTICE TEST REACTOR PROJECT CAH-100

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ballard, D.L.; Brown, W.W.; Harrison, C.W.

    Design and construction specifications to be followed in the development of the reactor, its associated systems and experimental facilities, and the housing and required services for the facility are presented. The testing procedures to be used are outlined. (D.C.W.)

  20. 14 CFR 33.75 - Safety analysis.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... judgment and previous experience combined with sound design and test philosophies. (4) The applicant must... STANDARDS: AIRCRAFT ENGINES Design and Construction; Turbine Aircraft Engines § 33.75 Safety analysis. (a... the effects of failures and likely combination of failures be verified by test. (c) The primary...

  1. 14 CFR 33.75 - Safety analysis.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... judgment and previous experience combined with sound design and test philosophies. (4) The applicant must... STANDARDS: AIRCRAFT ENGINES Design and Construction; Turbine Aircraft Engines § 33.75 Safety analysis. (a... the effects of failures and likely combination of failures be verified by test. (c) The primary...

  2. 14 CFR 33.75 - Safety analysis.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... judgment and previous experience combined with sound design and test philosophies. (4) The applicant must... STANDARDS: AIRCRAFT ENGINES Design and Construction; Turbine Aircraft Engines § 33.75 Safety analysis. (a... the effects of failures and likely combination of failures be verified by test. (c) The primary...

  3. 14 CFR 33.75 - Safety analysis.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... judgment and previous experience combined with sound design and test philosophies. (4) The applicant must... STANDARDS: AIRCRAFT ENGINES Design and Construction; Turbine Aircraft Engines § 33.75 Safety analysis. (a... the effects of failures and likely combination of failures be verified by test. (c) The primary...

  4. 49 CFR 178.274 - Specifications for UN portable tanks.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... and 178.277, as applicable. Design type means a portable tank or series of portable tanks made of... the top of the shell during the hydraulic pressure test equal to not less than 1.5 times the design... be designed and constructed to withstand a hydraulic test pressure of not less than 1.5 times the...

  5. 49 CFR 178.274 - Specifications for UN portable tanks.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... and 178.277, as applicable. Design type means a portable tank or series of portable tanks made of... the top of the shell during the hydraulic pressure test equal to not less than 1.5 times the design... be designed and constructed to withstand a hydraulic test pressure of not less than 1.5 times the...

  6. Around Marshall

    NASA Image and Video Library

    1963-08-12

    At its founding, the Marshall Space Flight Center (MSFC) inherited the Army’s Jupiter and Redstone test stands, but much larger facilities were needed for the giant stages of the Saturn V. From 1960 to 1964, the existing stands were remodeled and a sizable new test area was developed. The new comprehensive test complex for propulsion and structural dynamics was unique within the nation and the free world, and they remain so today because they were constructed with foresight to meet the future as well as on going needs. Construction of the S-IC Static test stand complex began in 1961 in the west test area of MSFC, and was completed in 1964. The S-IC static test stand was designed to develop and test the 138-ft long and 33-ft diameter Saturn V S-IC first stage, or booster stage, weighing in at 280,000 pounds. Required to hold down the brute force of a 7,500,000-pound thrust produced by 5 F-1 engines, the S-IC static test stand was designed and constructed with the strength of hundreds of tons of steel and 12,000,000 pounds of cement, planted down to bedrock 40 feet below ground level. The foundation walls, constructed with concrete and steel, are 4 feet thick. The base structure consists of four towers with 40-foot-thick walls extending upward 144 feet above ground level. The structure was topped by a crane with a 135-foot boom. With the boom in the upright position, the stand was given an overall height of 405 feet, placing it among the highest structures in Alabama at the time. In addition to the stand itself, related facilities were constructed during this time. Built to the east was a newly constructed Pump House. Its function was to provide water to the stand to prevent melting damage during testing. The water was sprayed through small holes in the stand’s 1900 ton flame deflector at the rate of 320,000 gallons per minute. In this photo, taken August 12, 1963, the S-IC stand has received some of its internal components. Directly in the center is the framework that houses the flame deflector. The F-1 test stand, designed and built to test a single F-1 engine, can be seen on the left side of the photo.

  7. Hybrid Enhanced Epidermal SpaceSuit Design Approaches

    NASA Astrophysics Data System (ADS)

    Jessup, Joseph M.

    A Space suit that does not rely on gas pressurization is a multi-faceted problem that requires major stability controls to be incorporated during design and construction. The concept of Hybrid Epidermal Enhancement space suit integrates evolved human anthropomorphic and physiological adaptations into its functionality, using commercially available bio-medical technologies to address shortcomings of conventional gas pressure suits, and the impracticalities of MCP suits. The prototype HEE Space Suit explored integumentary homeostasis, thermal control and mobility using advanced bio-medical materials technology and construction concepts. The goal was a space suit that functions as an enhanced, multi-functional bio-mimic of the human epidermal layer that works in attunement with the wearer rather than as a separate system. In addressing human physiological requirements for design and construction of the HEE suit, testing regimes were devised and integrated into the prototype which was then subject to a series of detailed tests using both anatomical reproduction methods and human subject.

  8. Severe Accident Test Station Design Document

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Snead, Mary A.; Yan, Yong; Howell, Michael

    The purpose of the ORNL severe accident test station (SATS) is to provide a platform for evaluation of advanced fuels under projected beyond design basis accident (BDBA) conditions. The SATS delivers the capability to map the behavior of advanced fuels concepts under accident scenarios across various temperature and pressure profiles, steam and steam-hydrogen gas mixtures, and thermal shock. The overall facility will include parallel capabilities for examination of fuels and irradiated materials (in-cell) and non-irradiated materials (out-of-cell) at BDBA conditions as well as design basis accident (DBA) or loss of coolant accident (LOCA) conditions. Also, a supporting analytical infrastructure tomore » provide the data-needs for the fuel-modeling components of the Fuel Cycle Research and Development (FCRD) program will be put in place in a parallel manner. This design report contains the information for the first, second and third phases of design and construction of the SATS. The first phase consisted of the design and construction of an out-of-cell BDBA module intended for examination of non-irradiated materials. The second phase of this work was to construct the BDBA in-cell module to test irradiated fuels and materials as well as the module for DBA (i.e. LOCA) testing out-of-cell, The third phase was to build the in-cell DBA module. The details of the design constraints and requirements for the in-cell facility have been closely captured during the deployment of the out-of-cell SATS modules to ensure effective future implementation of the in-cell modules.« less

  9. GPS antenna designs

    NASA Technical Reports Server (NTRS)

    Laube, Samuel J. P.

    1987-01-01

    Application of the current GPS NAVSTAR system to civilian service requires that a right hand, circularly polarized, -160 dBW spread spectrum signal be received from an orbiting satellite, where the antenna environment is also moving. This presents a design challenge when inexpensive antennas are desired. The intent of this survey is to provide information on the antennas mentioned and to construct and test prototypes to determine whether the choice made by the industry, the quadrifilar helix, is the best. The helix antenna is currently the low cost standard for GPS. Prototype versions were constructed using 12 gauge wire and subminiature coaxial hardline. The constructed antennas were tested using a signal generator and a reference turnstile. A spectrum analyzer was used to measure the level of the received signal.

  10. A Maximin Model for Test Design with Practical Constraints. Project Psychometric Aspects of Item Banking No. 25. Research Report 87-10.

    ERIC Educational Resources Information Center

    van der Linden, Wim J.; Boekkooi-Timminga, Ellen

    A "maximin" model for item response theory based test design is proposed. In this model only the relative shape of the target test information function is specified. It serves as a constraint subject to which a linear programming algorithm maximizes the information in the test. In the practice of test construction there may be several…

  11. Design of an autonomous lunar construction utility vehicle

    NASA Technical Reports Server (NTRS)

    1990-01-01

    In order to prepare a site for a lunar base, an autonomously operated construction vehicle is necessary. Discussed here is a Lunar Construction Utility Vehicle (LCUV), which uses interchangeable construction implements. Design of an elastic loop track system has advanced to the testing stage. A standard coupling device has been designed to insure a proper connection between the different construction tools and the LCUV. Autonomous control of the track drive motors was simulated successfully through the use of a joystick and a computer interface. A study of hydrogen-oxygen fuel cells produced estimates of reactant and product requirements and identified multilayer insulation needs. Research on the 100-kW heat rejection system determined that it is necessary to transport the radiator panel on a utility trailer. Extensive logistical support for the 720 hour use cycle requires further study.

  12. 33 CFR 159.105 - Shock test.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... MARINE SANITATION DEVICES Design, Construction, and Testing § 159.105 Shock test. The device, with liquid retention components, if any, filled with water to half of their volume, must be subjected to 1,000 vertical...

  13. Impact evaluation of composite floor sections

    NASA Technical Reports Server (NTRS)

    Boitnott, Richard L.; Fasanella, Edwin L.

    1989-01-01

    Graphite-epoxy floor sections representative of aircraft fuselage construction were statically and dynamically tested to evaluate their response to crash loadings. These floor sections were fabricated using a frame-stringer design typical of present aluminum aircraft without features to enhance crashworthiness. The floor sections were tested as part of a systematic research program developed to study the impact response of composite components of increasing complexity. The ultimate goal of the research program is to develop crashworthy design features for future composite aircraft. Initially, individual frames of six-foot diameter were tested both statically and dynamically. The frames were then used to construct built-up floor sections for dynamic tests at impact velocities of approximately 20 feet/sec to simulate survivable crash velocities. In addition, static tests were conducted to gain a better understanding of the failure mechanisms seen in the dynamic tests.

  14. The Architecture Design of Detection and Calibration System for High-voltage Electrical Equipment

    NASA Astrophysics Data System (ADS)

    Ma, Y.; Lin, Y.; Yang, Y.; Gu, Ch; Yang, F.; Zou, L. D.

    2018-01-01

    With the construction of Material Quality Inspection Center of Shandong electric power company, Electric Power Research Institute takes on more jobs on quality analysis and laboratory calibration for high-voltage electrical equipment, and informationization construction becomes urgent. In the paper we design a consolidated system, which implements the electronic management and online automation process for material sampling, test apparatus detection and field test. In the three jobs we use QR code scanning, online Word editing and electronic signature. These techniques simplify the complex process of warehouse management and testing report transferring, and largely reduce the manual procedure. The construction of the standardized detection information platform realizes the integrated management of high-voltage electrical equipment from their networking, running to periodic detection. According to system operation evaluation, the speed of transferring report is doubled, and querying data is also easier and faster.

  15. DOE Office of Scientific and Technical Information (OSTI.GOV)

    French, T.

    The Warden ASP project has progressed from the initial planning stage to construction of an injection plant. An ASP chemical system was designed based on laboratory evaluations that included interfacial tension, mobility requirements, rock-alkali interaction, fluid capabilities, and core tests. Field cores were obtained from the Permian No. 5 and No. 6 sands on the Warden lease in Sho-Vel-Tum oil field. A separate tank battery for the pilot pattern area was installed, and a field tracer test is currently being evaluated. Tracer test results to date indicate that there is no major fracturing in the No. 5 sand. There ismore » indication, however, of some channeling through high permeability sand. The field injection plant was designed, and construction is in progress. Several variations of injection plant design have been evaluated. Some plant design details, such as alkali storage, were found to be dependent on the availability of use equipment and project budget. The surfactant storage facility design was shown to be dependent on surfactant rheology.« less

  16. Design, engineering and evaluation of refractory liners for slagging gasifiers. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    deTineo, B J; Booth, G; Firestone, R F

    1982-08-01

    The contract for this program was awarded at the end of September 1978. Work was started on 1 October 1978, on Tasks A, B, and E. Task A, Conceptual Liner Designs, and Task B, Test System Design and Construction, were completed. Task C, Liner Tests, and Task D, Liner Design Evaluation, were to begin upon completion of Task B. Task E, Liner Model Development, is inactive after an initial data compilation and theoretical model development effort. It was to be activated as soon as data were available from Task D. Task F, Liner Design Handbook, was active along with Taskmore » A since the reports of both tasks were to use the same format. At this time, Tasks C, D, and F are not to be completed since funding of this project was phased out by DOE directive. The refractory text facility, which was constructed, was tested and found to perform satisfactorily. It is described in detail, including a hazard analysis which was performed. (LTN)« less

  17. A Comparison of Three IRT Approaches to Examinee Ability Change Modeling in a Single-Group Anchor Test Design

    ERIC Educational Resources Information Center

    Paek, Insu; Park, Hyun-Jeong; Cai, Li; Chi, Eunlim

    2014-01-01

    Typically a longitudinal growth modeling based on item response theory (IRT) requires repeated measures data from a single group with the same test design. If operational or item exposure problems are present, the same test may not be employed to collect data for longitudinal analyses and tests at multiple time points are constructed with unique…

  18. Around Marshall

    NASA Image and Video Library

    1962-10-26

    At its founding, the Marshall Space Flight Center (MSFC) inherited the Army’s Jupiter and Redstone test stands, but much larger facilities were needed for the giant stages of the Saturn V. From 1960 to 1964, the existing stands were remodeled and a sizable new test area was developed. The new comprehensive test complex for propulsion and structural dynamics was unique within the nation and the free world, and they remain so today because they were constructed with foresight to meet the future as well as on going needs. Construction of the S-IC Static test stand complex began in 1961 in the west test area of MSFC, and was completed in 1964. The S-IC static test stand was designed to develop and test the 138-ft long and 33-ft diameter Saturn V S-IC first stage, or booster stage, weighing in at 280,000 pounds. Required to hold down the brute force of a 7,500,000-pound thrust produced by 5 F-1 engines, the S-IC static test stand was designed and constructed with the strength of hundreds of tons of steel and 12,000,000 pounds of cement, planted down to bedrock 40 feet below ground level. The foundation walls, constructed with concrete and steel, are 4 feet thick. The base structure consists of four towers with 40-foot-thick walls extending upward 144 feet above ground level. The structure was topped by a crane with a 135-foot boom. With the boom in the upright position, the stand was given an overall height of 405 feet, placing it among the highest structures in Alabama at the time. In addition to the stand itself, related facilities were constructed during this time. Built directly east of the test stand was the Block House, which served as the control center for the test stand. The two were connected by a narrow access tunnel which housed the cables for the controls. This construction photo, taken October 26, 1962, depicts a view of the Block House tunnel opening.

  19. Around Marshall

    NASA Image and Video Library

    1962-08-17

    At its founding, the Marshall Space Flight Center (MSFC) inherited the Army’s Jupiter and Redstone test stands, but much larger facilities were needed for the giant stages of the Saturn V. From 1960 to 1964, the existing stands were remodeled and a sizable new test area was developed. The new comprehensive test complex for propulsion and structural dynamics was unique within the nation and the free world, and they remain so today because they were constructed with foresight to meet the future as well as on going needs. Construction of the S-IC Static test stand complex began in 1961 in the west test area of MSFC, and was completed in 1964. The S-IC static test stand was designed to develop and test the 138-ft long and 33-ft diameter Saturn V S-IC first stage, or booster stage, weighing in at 280,000 pounds. Required to hold down the brute force of a 7,500,000-pound thrust produced by 5 F-1 engines, the S-IC static test stand was designed and constructed with the strength of hundreds of tons of steel and 12,000,000 pounds of cement, planted down to bedrock 40 feet below ground level. The foundation walls, constructed with concrete and steel, are 4 feet thick. The base structure consists of four towers with 40-foot-thick walls extending upward 144 feet above ground level. The structure was topped by a crane with a 135-foot boom. With the boom in the upright position, the stand was given an overall height of 405 feet, placing it among the highest structures in Alabama at the time. In addition to the stand itself, related facilities were constructed during this time. Built directly east of the test stand was the Block House, which served as the control center for the test stand. The two were connected by a narrow access tunnel which housed the cables for the controls. This construction photo taken August 17, 1962 depicts a back side view of the Block House.

  20. Around Marshall

    NASA Image and Video Library

    1962-11-15

    At its founding, the Marshall Space Flight Center (MSFC) inherited the Army’s Jupiter and Redstone test stands, but much larger facilities were needed for the giant stages of the Saturn V. From 1960 to 1964, the existing stands were remodeled and a sizable new test area was developed. The new comprehensive test complex for propulsion and structural dynamics was unique within the nation and the free world, and they remain so today because they were constructed with foresight to meet the future as well as on going needs. Construction of the S-IC Static test stand complex began in 1961 in the west test area of MSFC, and was completed in 1964. The S-IC static test stand was designed to develop and test the 138-ft long and 33-ft diameter Saturn V S-IC first stage, or booster stage, weighing in at 280,000 pounds. Required to hold down the brute force of a 7,500,000-pound thrust produced by 5 F-1 engines, the S-IC static test stand was designed and constructed with the strength of hundreds of tons of steel and 12,000,000 pounds of cement, planted down to bedrock 40 feet below ground level. The foundation walls, constructed with concrete and steel, are 4 feet thick. The base structure consists of four towers with 40-foot-thick walls extending upward 144 feet above ground level. The structure was topped by a crane with a 135-foot boom. With the boom in the upright position, the stand was given an overall height of 405 feet, placing it among the highest structures in Alabama at the time. In addition to the stand itself, related facilities were constructed during this time. Built directly east of the test stand was the Block House, which served as the control center for the test stand. The two were connected by a narrow access tunnel which housed the cables for the controls. This construction photo, taken November 15, 1962, depicts a view of the Block House.

  1. Around Marshall

    NASA Image and Video Library

    1962-06-13

    At its founding, the Marshall Space Flight Center (MSFC) inherited the Army’s Jupiter and Redstone test stands, but much larger facilities were needed for the giant stages of the Saturn V. From 1960 to 1964, the existing stands were remodeled and a sizable new test area was developed. The new comprehensive test complex for propulsion and structural dynamics was unique within the nation and the free world, and they remain so today because they were constructed with foresight to meet the future as well as on going needs. Construction of the S-IC Static test stand complex began in 1961 in the west test area of MSFC, and was completed in 1964. The S-IC static test stand was designed to develop and test the 138-ft long and 33-ft diameter Saturn V S-IC first stage, or booster stage, weighing in at 280,000 pounds. Required to hold down the brute force of a 7,500,000-pound thrust produced by 5 F-1 engines, the S-IC static test stand was designed and constructed with the strength of hundreds of tons of steel and 12,000,000 pounds of cement, planted down to bedrock 40 feet below ground level. The foundation walls, constructed with concrete and steel, are 4 feet thick. The base structure consists of four towers with 40-foot-thick walls extending upward 144 feet above ground level. The structure was topped by a crane with a 135-foot boom. With the boom in the upright position, the stand was given an overall height of 405 feet, placing it among the highest structures in Alabama at the time. In addition to the stand itself, related facilities were constructed during this time. Built directly east of the test stand was the Block House, which served as the control center for the test stand. The two were connected by a narrow access tunnel which housed the cables for the controls. Construction of the tunnel is depicted in this photo taken June 13, 1962.

  2. Fire Resistance Testing of Bulkhead and Deck Penetrations. Phase 2

    DTIC Science & Technology

    1988-12-01

    thick steel plate. All sample 12 construction was representative of Class A-0 construction. The UL staff secured insulation ( rockwool batts) to the...designated side of the steel plates and penetrants for testing as Class A-60 deck assemblies. The rockwool batts complied with the Class A-60...insulated with rockwool batts and tested for a Class A-60 rating. This group consisted of one steel penetration, eight copper penetrations, four PVC

  3. Design and test of a magnetic thrust bearing

    NASA Technical Reports Server (NTRS)

    Allaire, P. E.; Mikula, A.; Banerjee, B.; Lewis, D. W.; Imlach, J.

    1993-01-01

    A magnetic thrust bearing can be employed to take thrust loads in rotating machinery. The design and construction of a prototype magnetic thrust bearing for a high load per weight application is described. The theory for the bearing is developed. Fixtures were designed and the bearing was tested for load capacity using a universal testing machine. Various shims were employed to have known gap thicknesses. A comparison of the theory and measured results is presented.

  4. Around Marshall

    NASA Image and Video Library

    1961-08-14

    At its founding, the Marshall Space Flight Center (MSFC) inherited the Army’s Jupiter and Redstone test stands, but much larger facilities were needed for the giant stages of the Saturn V. From 1960 to 1964, the existing stands were remodeled and a sizable new test area was developed. The new comprehensive test complex for propulsion and structural dynamics was unique within the nation and the free world, and they remain so today because they were constructed with foresight to meet the future as well as on going needs. Construction of the S-IC Static test stand complex began in 1961 in the west test area of MSFC, and was completed in 1964. The S-IC static test stand was designed to develop and test the 138-ft long and 33-ft diameter Saturn V S-IC first stage, or booster stage, weighing in at 280,000 pounds. Required to hold down the brute force of a 7,500,000-pound thrust produced by 5 F-1 engines, the S-IC static test stand was designed and constructed with the strength of hundreds of tons of steel and 12,000,000 pounds of cement, planted down to bedrock 40 feet below ground level. The foundation walls, constructed with concrete and steel, are 4 feet thick. The base structure consists of four towers with 40-foot-thick walls extending upward 144 feet above ground level. The structure was topped by a crane with a 135-foot boom. With the boom in the upright position, the stand was given an overall height of 405 feet, placing it among the highest structures in Alabama at the time. This photo shows the construction progress of the test stand as of August 14, 1961.

  5. Around Marshall

    NASA Image and Video Library

    1961-08-18

    At its founding, the Marshall Space Flight Center (MSFC) inherited the Army’s Jupiter and Redstone test stands, but much larger facilities were needed for the giant stages of the Saturn V. From 1960 to 1964, the existing stands were remodeled and a sizable new test area was developed. The new comprehensive test complex for propulsion and structural dynamics was unique within the nation and the free world, and they remain so today because they were constructed with foresight to meet the future as well as on going needs. Construction of the S-IC Static test stand complex began in 1961 in the west test area of MSFC, and was completed in 1964. The S-IC static test stand was designed to develop and test the 138-ft long and 33-ft diameter Saturn V S-IC first stage, or booster stage, weighing in at 280,000 pounds. Required to hold down the brute force of a 7,500,000-pound thrust produced by 5 F-1 engines, the S-IC static test stand was designed and constructed with the strength of hundreds of tons of steel and 12,000,000 pounds of cement, planted down to bedrock 40 feet below ground level. The foundation walls, constructed with concrete and steel, are 4 feet thick. The base structure consists of four towers with 40-foot-thick walls extending upward 144 feet above ground level. The structure was topped by a crane with a 135-foot boom. With the boom in the upright position, the stand was given an overall height of 405 feet, placing it among the highest structures in Alabama at the time. This photo shows the construction progress of the test stand as of August 18, 1961.

  6. Around Marshall

    NASA Image and Video Library

    1961-08-11

    At its founding, the Marshall Space Flight Center (MSFC) inherited the Army’s Jupiter and Redstone test stands, but much larger facilities were needed for the giant stages of the Saturn V. From 1960 to 1964, the existing stands were remodeled and a sizable new test area was developed. The new comprehensive test complex for propulsion and structural dynamics was unique within the nation and the free world, and they remain so today because they were constructed with foresight to meet the future as well as on going needs. Construction of the S-IC Static test stand complex began in 1961 in the west test area of MSFC, and was completed in 1964. The S-IC static test stand was designed to develop and test the 138-ft long and 33-ft diameter Saturn V S-IC first stage, or booster stage, weighing in at 280,000 pounds. Required to hold down the brute force of a 7,500,000-pound thrust produced by 5 F-1 engines, the S-IC static test stand was designed and constructed with the strength of hundreds of tons of steel and 12,000,000 pounds of cement, planted down to bedrock 40 feet below ground level. The foundation walls, constructed with concrete and steel, are 4 feet thick. The base structure consists of four towers with 40-foot-thick walls extending upward 144 feet above ground level. The structure was topped by a crane with a 135-foot boom. With the boom in the upright position, the stand was given an overall height of 405 feet, placing it among the highest structures in Alabama at the time. This photo shows the construction progress of the test stand as of August 11, 1961.

  7. Around Marshall

    NASA Image and Video Library

    1961-09-07

    At its founding, the Marshall Space Flight Center (MSFC) inherited the Army’s Jupiter and Redstone test stands, but much larger facilities were needed for the giant stages of the Saturn V. From 1960 to 1964, the existing stands were remodeled and a sizable new test area was developed. The new comprehensive test complex for propulsion and structural dynamics was unique within the nation and the free world, and they remain so today because they were constructed with foresight to meet the future as well as on going needs. Construction of the S-IC Static test stand complex began in 1961 in the west test area of MSFC, and was completed in 1964. The S-IC static test stand was designed to develop and test the 138-ft long and 33-ft diameter Saturn V S-IC first stage, or booster stage, weighing in at 280,000 pounds. Required to hold down the brute force of a 7,500,000-pound thrust produced by 5 F-1 engines, the S-IC static test stand was designed and constructed with the strength of hundreds of tons of steel and 12,000,000 pounds of cement, planted down to bedrock 40 feet below ground level. The foundation walls, constructed with concrete and steel, are 4 feet thick. The base structure consists of four towers with 40-foot-thick walls extending upward 144 feet above ground level. The structure was topped by a crane with a 135-foot boom. With the boom in the upright position, the stand was given an overall height of 405 feet, placing it among the highest structures in Alabama at the time. This photo shows the construction progress of the S-IC test stand as of September 7, 1961.

  8. Construction Progress of the S-IC Test Stand-Steel Reinforcements

    NASA Technical Reports Server (NTRS)

    1961-01-01

    At its founding, the Marshall Space Flight Center (MSFC) inherited the Army's Jupiter and Redstone test stands, but much larger facilities were needed for the giant stages of the Saturn V. From 1960 to 1964, the existing stands were remodeled and a sizable new test area was developed. The new comprehensive test complex for propulsion and structural dynamics was unique within the nation and the free world, and they remain so today because they were constructed with foresight to meet the future as well as on going needs. Construction of the S-IC Static test stand complex began in 1961 in the west test area of MSFC, and was completed in 1964. The S-IC static test stand was designed to develop and test the 138-ft long and 33-ft diameter Saturn V S-IC first stage, or booster stage, weighing in at 280,000 pounds. Required to hold down the brute force of a 7,500,000-pound thrust produced by 5 F-1 engines, the S-IC static test stand was designed and constructed with the strength of hundreds of tons of steel and 12,000,000 pounds of cement, planted down to bedrock 40 feet below ground level. The foundation walls, constructed with concrete and steel, are 4 feet thick. The base structure consists of four towers with 40-foot-thick walls extending upward 144 feet above ground level. The structure was topped by a crane with a 135-foot boom. With the boom in the upright position, the stand was given an overall height of 405 feet, placing it among the highest structures in Alabama at the time. This photo, taken September 15, 1961, shows the installation of the reinforcing steel prior to the pouring of the concrete foundation walls.

  9. Around Marshall

    NASA Image and Video Library

    1961-06-30

    At its founding, the Marshall Space Flight Center (MSFC) inherited the Army’s Jupiter and Redstone test stands, but much larger facilities were needed for the giant stages of the Saturn V. From 1960 to 1964, the existing stands were remodeled and a sizable new test area was developed. The new comprehensive test complex for propulsion and structural dynamics was unique within the nation and the free world, and they remain so today because they were constructed with foresight to meet the future as well as on going needs. Construction of the S-IC Static test stand complex began in 1961 in the west test area of MSFC, and was completed in 1964. The S-IC static test stand was designed to develop and test the 138-ft long and 33-ft diameter Saturn V S-IC first stage, or booster stage, weighing in at 280,000 pounds. Required to hold down the brute force of a 7,500,000-pound thrust produced by 5 F-1 engines, the S-IC static test stand was designed and constructed with the strength of hundreds of tons of steel and 12,000,000 pounds of cement, planted down to bedrock 40 feet below ground level. The foundation walls, constructed with concrete and steel, are 4 feet thick. The base structure consists of four towers with 40-foot-thick walls extending upward 144 feet above ground level. The structure was topped by a crane with a 135-foot boom. With the boom in the upright position, the stand was given an overall height of 405 feet, placing it among the highest structures in Alabama at the time. In this early construction photo, taken June 30, 1961, workers are involved in the survey and site preparation for the test stand.

  10. Evaluation of the Lateral Performance of Roof Truss-to-Wall Connections in Light-Frame Wood Systems

    Treesearch

    Andrew DeRenzis; Vladimir Kochkin; Xiping Wang

    2012-01-01

    This testing program was designed to benchmark the performance of traditional roof systems and incrementally improved roof-to-wall systems with the goal of developing connection solutions that are optimized for performance and constructability. Nine full-size roof systems were constructed and tested with various levels and types of heel detailing to measure the lateral...

  11. The Construction of a Motor Fitness Test Battery for Boys in the Lower Elementary Grades.

    ERIC Educational Resources Information Center

    DiNucci, James M.; Shore, John Roger

    In order to construct a scientifically designed evaluative instrument to assess the motor fitness of boys in the primary grades, 30 test items purported to measure muscular strength, muscular endurance, cardiovascular endurance, power, speed, agility, flexibility, and balance were administered to an incidental sample of 238 boys ages 6 to 9 years.…

  12. Live Virtual Constructive Distributed Test Environment Characterization Report

    NASA Technical Reports Server (NTRS)

    Murphy, Jim; Kim, Sam K.

    2013-01-01

    This report documents message latencies observed over various Live, Virtual, Constructive, (LVC) simulation environment configurations designed to emulate possible system architectures for the Unmanned Aircraft Systems (UAS) Integration in the National Airspace System (NAS) Project integrated tests. For each configuration, four scenarios with progressively increasing air traffic loads were used to determine system throughput and bandwidth impacts on message latency.

  13. 46 CFR 32.60-40 - Construction and testing of cargo tanks and bulkheads-TB/ALL.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... cargo tanks vented at gage pressure of 4 pounds per square inch or less shall be constructed and tested... 4 pounds per square inch but not exceeding 10 pounds per square inch gage pressure will be given... square inch are considered to be pressure vessels and shall be of cylindrical or similar design and shall...

  14. 46 CFR 32.60-40 - Construction and testing of cargo tanks and bulkheads-TB/ALL.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... cargo tanks vented at gage pressure of 4 pounds per square inch or less shall be constructed and tested... 4 pounds per square inch but not exceeding 10 pounds per square inch gage pressure will be given... square inch are considered to be pressure vessels and shall be of cylindrical or similar design and shall...

  15. 46 CFR 32.60-40 - Construction and testing of cargo tanks and bulkheads-TB/ALL.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... cargo tanks vented at gage pressure of 4 pounds per square inch or less shall be constructed and tested... 4 pounds per square inch but not exceeding 10 pounds per square inch gage pressure will be given... square inch are considered to be pressure vessels and shall be of cylindrical or similar design and shall...

  16. 46 CFR 32.60-40 - Construction and testing of cargo tanks and bulkheads-TB/ALL.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... cargo tanks vented at gage pressure of 4 pounds per square inch or less shall be constructed and tested... 4 pounds per square inch but not exceeding 10 pounds per square inch gage pressure will be given... square inch are considered to be pressure vessels and shall be of cylindrical or similar design and shall...

  17. 46 CFR 32.60-40 - Construction and testing of cargo tanks and bulkheads-TB/ALL.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... cargo tanks vented at gage pressure of 4 pounds per square inch or less shall be constructed and tested... 4 pounds per square inch but not exceeding 10 pounds per square inch gage pressure will be given... square inch are considered to be pressure vessels and shall be of cylindrical or similar design and shall...

  18. How Did the Meanings Constructed by Taiwanese Pre-Service Teachers from Educational News Media Affect Their Beliefs?

    ERIC Educational Resources Information Center

    Liu, Shih-Hsiung; Tsao, Shih-Chieh

    2013-01-01

    The study investigates how Taiwanese pre-service teachers make meaning after reading positive or negative news coverage of educational events and how they construct meaning impact their pedagogical beliefs. An experiment with a two-group pre-test-post-test design, consisting of a positive and negative news group, is conducted. Multimedia news…

  19. An automated system for chromosome analysis. Volume 1: Goals, system design, and performance

    NASA Technical Reports Server (NTRS)

    Castleman, K. R.; Melnyk, J. H.

    1975-01-01

    The design, construction, and testing of a complete system to produce karyotypes and chromosome measurement data from human blood samples, and a basis for statistical analysis of quantitative chromosome measurement data is described. The prototype was assembled, tested, and evaluated on clinical material and thoroughly documented.

  20. 75 FR 33357 - Agency Information Collection Activities: Submission for the Office of Management and Budget (OMB...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-11

    ... or asked to report: Licensees and applicants for nuclear power plants and research and test... detailed review of applications for licenses and amendments thereto to construct and operate nuclear power plants, preliminary or final design approvals, design certifications, research and test facilities...

  1. Hurricane Proof This!

    ERIC Educational Resources Information Center

    Sterling, Donna R.

    2010-01-01

    While learning about the types of weather events that occur in the local area, students in grades 4-6 were asked to consider how structures can be built to withstand extreme weather conditions. Teams of students designed, constructed, and tested buildings to withstand hurricanes and designed the tests they would use to evaluate their structures.…

  2. 14 CFR 35.15 - Safety analysis.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... combined with sound design and test philosophies. (b) If significant doubt exists as to the effects of... STANDARDS: PROPELLERS Design and Construction § 35.15 Safety analysis. (a)(1) The applicant must analyze the... to be verified by test. (c) The primary failures of certain single propeller elements (for example...

  3. 14 CFR 35.15 - Safety analysis.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... combined with sound design and test philosophies. (b) If significant doubt exists as to the effects of... STANDARDS: PROPELLERS Design and Construction § 35.15 Safety analysis. (a)(1) The applicant must analyze the... to be verified by test. (c) The primary failures of certain single elements (for example, blades...

  4. 14 CFR 35.15 - Safety analysis.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... combined with sound design and test philosophies. (b) If significant doubt exists as to the effects of... STANDARDS: PROPELLERS Design and Construction § 35.15 Safety analysis. (a)(1) The applicant must analyze the... to be verified by test. (c) The primary failures of certain single elements (for example, blades...

  5. 14 CFR 35.15 - Safety analysis.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... combined with sound design and test philosophies. (b) If significant doubt exists as to the effects of... STANDARDS: PROPELLERS Design and Construction § 35.15 Safety analysis. (a)(1) The applicant must analyze the... to be verified by test. (c) The primary failures of certain single elements (for example, blades...

  6. Single- versus Double-Scoring of Trend Responses in Trend Score Equating with Constructed-Response Tests. Research Report. ETS RR-10-12

    ERIC Educational Resources Information Center

    Tan, Xuan; Ricker, Kathryn L.; Puhan, Gautam

    2010-01-01

    This study examines the differences in equating outcomes between two trend score equating designs resulting from two different scoring strategies for trend scoring when operational constructed-response (CR) items are double-scored--the single group (SG) design, where each trend CR item is double-scored, and the nonequivalent groups with anchor…

  7. The glider

    NASA Technical Reports Server (NTRS)

    Blume, W

    1922-01-01

    This report presents the results of testing on a glider designed and built by the College Aviation Group. The design and construction were based on the following principles: 1) the glider will be made to descend as slowly as possible; 2) rigidity and resistance were arranged to meet the conditions of varied loads; 3) construction is as simple as possible; 4) and great ease in assembling and dismounting have been sought.

  8. Large-scale performance and design for construction activity erosion control best management practices.

    PubMed

    Faucette, L B; Scholl, B; Beighley, R E; Governo, J

    2009-01-01

    The National Pollutant Discharge Elimination System (NPDES) Phase II requires construction activities to have erosion and sediment control best management practices (BMPs) designed and installed for site storm water management. Although BMPs are specified on storm water pollution prevention plans (SWPPPs) as part of the construction general permit (GP), there is little evidence in the research literature as to how BMPs perform or should be designed. The objectives of this study were to: (i) comparatively evaluate the performance of common construction activity erosion control BMPs under a standardized test method, (ii) evaluate the performance of compost erosion control blanket thickness, (iii) evaluate the performance of compost erosion control blankets (CECBs) on a variety of slope angles, and (iv) determine Universal Soil Loss Equation (USLE) cover management factors (C factors) for these BMPs to assist site designers and engineers. Twenty-three erosion control BMPs were evaluated using American Society of Testing and Materials (ASTM) D-6459, standard test method for determination of ECB performance in protecting hill slopes from rainfall induced erosion, on 4:1 (H:V), 3:1, and 2:1 slopes. Soil loss reduction for treatments exposed to 5 cm of rainfall on a 2:1 slope ranged from-7 to 99%. For rainfall exposure of 10 cm, treatment soil loss reduction ranged from 8 to 99%. The 2.5 and 5 cm CECBs significantly reduced erosion on slopes up to 2:1, while CECBs < 2.5 cm are not recommended on slopes >or= 4:1 when rainfall totals reach 5 cm. Based on the soil loss results, USLE C factors ranged from 0.01 to 0.9. These performance and design criteria should aid site planners and designers in decision-making processes.

  9. Construction Progress of the S-IC Test Stand-Pumps

    NASA Technical Reports Server (NTRS)

    1962-01-01

    At its founding, the Marshall Space Flight Center (MSFC) inherited the Army's Jupiter and Redstone test stands, but much larger facilities were needed for the giant stages of the Saturn V. From 1960 to 1964, the existing stands were remodeled and a sizable new test area was developed. The new comprehensive test complex for propulsion and structural dynamics was unique within the nation and the free world, and they remain so today because they were constructed with foresight to meet the future as well as on going needs. Construction of the S-IC Static test stand complex began in 1961 in the west test area of MSFC, and was completed in 1964. The S-IC static test stand was designed to develop and test the 138-ft long and 33-ft diameter Saturn V S-IC first stage, or booster stage, weighing in at 280,000 pounds. Required to hold down the brute force of a 7,500,000-pound thrust produced by 5 F-1 engines, the S-IC static test stand was designed and constructed with the strength of hundreds of tons of steel and 12,000,000 pounds of cement, planted down to bedrock 40 feet below ground level. The foundation walls, constructed with concrete and steel, are 4 feet thick. The base structure consists of four towers with 40-foot-thick walls extending upward 144 feet above ground level. The structure was topped by a crane with a 135-foot boom. With the boom in the upright position, the stand was given an overall height of 405 feet, placing it among the highest structures in Alabama at the time. This photo, taken April 4, 1961, shows the S-IC test stand dry once again when workers resumed construction after a 6 month delay due to booster size reconfiguration back in September of 1961. The disturbance of a natural spring during the excavation of the site required water to be pumped from the site continuously. The site was completely flooded after the pumps were shut down during the construction delay.

  10. The Advanced Technology Solar Telescope: design and early construction

    NASA Astrophysics Data System (ADS)

    McMullin, Joseph P.; Rimmele, Thomas R.; Keil, Stephen L.; Warner, Mark; Barden, Samuel; Bulau, Scott; Craig, Simon; Goodrich, Bret; Hansen, Eric; Hegwer, Steve; Hubbard, Robert; McBride, William; Shimko, Steve; Wöger, Friedrich; Ditsler, Jennifer

    2012-09-01

    The National Solar Observatory’s (NSO) Advanced Technology Solar Telescope (ATST) is the first large U.S. solar telescope accessible to the worldwide solar physics community to be constructed in more than 30 years. The 4-meter diameter facility will operate over a broad wavelength range (0.35 to 28 μm ), employing adaptive optics systems to achieve diffraction limited imaging and resolve features approximately 20 km on the Sun; the key observational parameters (collecting area, spatial resolution, spectral coverage, polarization accuracy, low scattered light) enable resolution of the theoretically-predicted, fine-scale magnetic features and their dynamics which modulate the radiative output of the sun and drive the release of magnetic energy from the Sun’s atmosphere in the form of flares and coronal mass ejections. In 2010, the ATST received a significant fraction of its funding for construction. In the subsequent two years, the project has hired staff and opened an office on Maui. A number of large industrial contracts have been placed throughout the world to complete the detailed designs and begin constructing the major telescope subsystems. These contracts have included the site development, AandE designs, mirrors, polishing, optic support assemblies, telescope mount and coudé rotator structures, enclosure, thermal and mechanical systems, and high-level software and controls. In addition, design development work on the instrument suite has undergone significant progress; this has included the completion of preliminary design reviews (PDR) for all five facility instruments. Permitting required for physically starting construction on the mountaintop of Haleakalā, Maui has also progressed. This paper will review the ATST goals and specifications, describe each of the major subsystems under construction, and review the contracts and lessons learned during the contracting and early construction phases. Schedules for site construction, key factory testing of major subsystems, and integration, test and commissioning activities will also be discussed.

  11. Around Marshall

    NASA Image and Video Library

    1963-09-05

    At its founding, the Marshall Space Flight Center (MSFC) inherited the Army’s Jupiter and Redstone test stands, but much larger facilities were needed for the giant stages of the Saturn V. From 1960 to 1964, the existing stands were remodeled and a sizable new test area was developed. The new comprehensive test complex for propulsion and structural dynamics was unique within the nation and the free world, and they remain so today because they were constructed with foresight to meet the future as well as on going needs. Construction of the S-IC Static test stand complex began in 1961 in the west test area of MSFC, and was completed in 1964. The S-IC static test stand was designed to develop and test the 138-ft long and 33-ft diameter Saturn V S-IC first stage, or booster stage, weighing in at 280,000 pounds. Required to hold down the brute force of a 7,500,000-pound thrust produced by 5 F-1 engines, the S-IC static test stand was designed and constructed with the strength of hundreds of tons of steel and 12,000,000 pounds of cement, planted down to bedrock 40 feet below ground level. The foundation walls, constructed with concrete and steel, are 4 feet thick. The base structure consists of four towers with 40-foot-thick walls extending upward 144 feet above ground level. The structure was topped by a crane with a 135-foot boom. With the boom in the upright position, the stand was given an overall height of 405 feet, placing it among the highest structures in Alabama at the time. In addition to the stand itself, related facilities were constructed during this time. In the center portion of this photograph, taken September 5, 1963, the spherical hydrogen storage tanks are being constructed. One of the massive tower legs of the S-IC test stand is visible to the far right.

  12. Around Marshall

    NASA Image and Video Library

    1961-08-14

    At its founding, the Marshall Space Flight Center (MSFC) inherited the Army’s Jupiter and Redstone test stands, but much larger facilities were needed for the giant stages of the Saturn V. From 1960 to 1964, the existing stands were remodeled and a sizable new test area was developed. The new comprehensive test complex for propulsion and structural dynamics was unique within the nation and the free world, and they remain so today because they were constructed with foresight to meet the future as well as on going needs. Construction of the S-IC Static test stand complex began in 1961 in the west test area of MSFC, and was completed in 1964. The S-IC static test stand was designed to develop and test the 138-ft long and 33-ft diameter Saturn V S-IC first stage, or booster stage, weighing in at 280,000 pounds. Required to hold down the brute force of a 7,500,000-pound thrust produced by 5 F-1 engines, the S-IC static test stand was designed and constructed with the strength of hundreds of tons of steel and 12,000,000 pounds of cement, planted down to bedrock 40 feet below ground level. The foundation walls, constructed with concrete and steel, are 4 feet thick. The base structure consists of four towers with 40-foot-thick walls extending upward 144 feet above ground level. The structure was topped by a crane with a 135-foot boom. With the boom in the upright position, the stand was given an overall height of 405 feet, placing it among the highest structures in Alabama at the time. This photo shows the construction progress of the test stand as of August 14, 1961. Water gushing in from the disturbance of a natural spring contributed to constant water problems during the construction process. It was necessary to pump water from the site on a daily basis and is still pumped from the site today. The equipment is partially submerged in the water emerging from the spring.

  13. Magnetic field design for a Penning ion source for a 200 keV electrostatic accelerator

    NASA Astrophysics Data System (ADS)

    Fathi, A.; Feghhi, S. A. H.; Sadati, S. M.; Ebrahimibasabi, E.

    2017-04-01

    In this study, the structure of magnetic field for a Penning ion source has been designed and constructed with the use of permanent magnets. The ion source has been designed and constructed for a 200 keV electrostatic accelerator. With using CST Studio Suite, the magnetic field profile inside the ion source was simulated and an appropriate magnetic system was designed to improve particle confinement. Designed system consists of two ring magnets with 9 mm distance from each other around the anode. The ion source was constructed and the cylindrical magnet and designed magnetic system were tested on the ion source. The results showed that the ignition voltage for ion source with the designed magnetic system is almost 300 V lower than the ion source with the cylindrical magnet. Better particle confinement causes lower voltage discharge to occur.

  14. Around Marshall

    NASA Image and Video Library

    1963-08-13

    At its founding, the Marshall Space Flight Center (MSFC) inherited the Army’s Jupiter and Redstone test stands, but much larger facilities were needed for the giant stages of the Saturn V. From 1960 to 1964, the existing stands were remodeled and a sizable new test area was developed. The new comprehensive test complex for propulsion and structural dynamics was unique within the nation and the free world, and they remain so today because they were constructed with foresight to meet the future as well as on going needs. Construction of the S-IC Static test stand complex began in 1961 in the west test area of MSFC, and was completed in 1964. The S-IC static test stand was designed to develop and test the 138-ft long and 33-ft diameter Saturn V S-IC first stage, or booster stage, weighing in at 280,000 pounds. Required to hold down the brute force of a 7,500,000-pound thrust produced by 5 F-1 engines, the S-IC static test stand was designed and constructed with the strength of hundreds of tons of steel and 12,000,000 pounds of cement, planted down to bedrock 40 feet below ground level. The foundation walls, constructed with concrete and steel, are 4 feet thick. The base structure consists of four towers with 40-foot-thick walls extending upward 144 feet above ground level. The structure was topped by a crane with a 135-foot boom. With the boom in the upright position, the stand was given an overall height of 405 feet, placing it among the highest structures in Alabama at the time. In addition to the stand itself, related facilities were constructed during this time. North of the massive S-IC test stand, the F-1 Engine test stand was built. Designed to assist in the development of the F-1 Engine, the F-1 test stand is a vertical engine firing test stand, 239 feet in elevation and 4,600 square feet in area at the base. Capability was provided for static firing of 1.5 million pounds of thrust using liquid oxygen and kerosene. Like the S-IC stand, the foundation of the F-1 stand is keyed into the bedrock approximately 40 feet below grade. This photo depicts the construction of the F-1 test stand as of August 13, 1963. All four of its tower legs are well underway into the skyline.

  15. Solar wind monitor—a school geophysics project

    NASA Astrophysics Data System (ADS)

    Robinson, Ian

    2018-05-01

    Described is an established geophysics project to construct a solar wind monitor based on a nT resolution fluxgate magnetometer. Low-cost and appropriate from school to university level it incorporates elements of astrophysics, geophysics, electronics, programming, computer networking and signal processing. The system monitors the earth’s field in real-time uploading data and graphs to a website every few minutes. Modular design encourages construction and testing by teams of students as well as expansion and refinement. The system has been tested running unattended for months at a time. Both the hardware design and software is published as open-source [1, 10].

  16. Airborne electronically steerable phased array

    NASA Technical Reports Server (NTRS)

    1972-01-01

    The results are presented of the second stage of a program for the design and development of a phased array capable of simultaneous and separate transmission and reception of radio frequency signals at S-band frequencies. The design goals of this stage were the development of three major areas of interest required for the final prototype model. These areas are the construction and testing of the low-weight, full-scale 128-element array of antenna elements, the development of the RF manifold feed system, and the construction and testing of a working module containing diplexer and transmit and receive circuits.

  17. Evaluation of Dynamic Characteristics of the Footbridge with Integral Abutments

    NASA Astrophysics Data System (ADS)

    Pańtak, Marek; Jarek, Bogusław

    2017-09-01

    The paper presents the results of dynamic field tests and numerical analysis of the footbridge designed as a three-span composite structure with integral abutments. The adopted design solution which has allowed to achieve a high resistance of the structure to dynamic loads and to meet the requirements of the criteria of comfort of use with a large reserve has been characterized. For comparative purposes, numerical analyzes of three construction variants of the footbridge were presented: F-1 - construction with integral abutments (realized variant), F-2 - construction with girders anchored in the abutments by means of tension rocker bearings, F-3 - construction with concrete side spans.

  18. Investigating pyrolysis/incineration as a method of resource recovery from solid waste

    NASA Technical Reports Server (NTRS)

    Robertson, Bobby J.; Lemay, Christopher S.

    1993-01-01

    Pyrolysis/incineration (P/I) is a physicochemical method for the generation of recoverable resources from solid waste materials such as inedible plant biomass (IPB), paper, plastics, cardboard, etc. P/I permits the collection of numerous gases with a minimal amount of solid residue. Pyrolysis, also known as starved air incineration, is usually conducted at relatively high temperatures (greater than 500 deg C) in the absence of oxygen. Incineration is conducted at lower temperatures in the presence of oxygen. The primary purpose of this study was to design, construct, and test a model P/I. The system design includes safety requirements for temperature and pressure. The objectives of this study were: (1) to design and construct a P/I system for incorporation with the Hybrid Regenerative Water Recovery System; (2) to initiate testing of the P/I system; (3) to collect and analyze P/I system data; (4) to consider test variables; and (5) to determine the feasibility of P/I as an effective method of resource recovery. A P/I system for the recovery of reuseable resources from solid waste materials was designed, constructed, and tested. Since a large amount of inedible plant biomass (IPB) will be generated in a space-based habitat on the lunar surface and Mars, IPB was the primary waste material tested in the system. Analysis of the effluent gases was performed to determine which gases could be used in a life support system.

  19. 10 CFR 50.55a - Codes and standards.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ..., standard design approval, and standard design certification application under part 52 of this chapter is..., and components must be designed, fabricated, erected, constructed, tested, and inspected to quality... Operation and Maintenance of Nuclear Power Plants; NRC Regulatory Guide (RG) 1.84, Revision 35, “Design...

  20. Status report on Project Hercules

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Loree, D.; Giesselmann, M.; Kristiansen, M.

    1993-01-01

    Project Hercules is a project to improve ignitron switches which will then be used on the upgrade of Lawrence Livermore's Nova Laser for their ICF program. The goals of Hercules, which stands for High Energy Research Concerning the Ultimate Lifetime of Experimental Switches, are to lifetime test (up to 10,000 shots) prototype ignitrons or other switches with the required Nova current and coulomb parameters (300 kA, 200 C), recommend design changes, and retest the second generation switches. This report describes the design and construction of the test circuit and necessary diagnostics. The details of the design and construction of themore » test circuit and necessary diagnostics. The details of the design and construction of a 0.5 MJ electrolytic capacitor bank and a semi-automatic diagnostic/control system are described. The required test run data include peak current and corresponding tube voltage for every shot, entire current and voltage waveforms every few shots, and ignitor resistance values every few shots. Additionally, the conversion of a 120 kW, 12 kV constant voltage supply to an 8 A constant current supply with the use of six SCRs and a commercial control board will be described. The final results of this project will be lifetime data at high current and high coulomb for and improvements on some of the best of the new generation of pulsed power switches.« less

  1. KSC-2012-1852

    NASA Image and Video Library

    2012-02-17

    Industrial Area Construction: Located 5 miles south of Launch Complex 39, construction of the main buildings -- Operations and Checkout Building, Headquarters Building, and Central Instrumentation Facility – began in 1963. In 1992, the Space Station Processing Facility was designed and constructed for the pre-launch processing of International Space Station hardware that was flown on the space shuttle. Along with other facilities, the industrial area provides spacecraft assembly and checkout, crew training, computer and instrumentation equipment, hardware preflight testing and preparations, as well as administrative offices. Poster designed by Kennedy Space Center Graphics Department/Greg Lee. Credit: NASA

  2. Small engine components test facility compressor testing cell at NASA Lewis Research Center

    NASA Technical Reports Server (NTRS)

    Brokopp, Richard A.; Gronski, Robert S.

    1992-01-01

    LeRC has designed and constructed a new test facility. This facility, called the Small Engine Components Facility (SECTF) is used to test gas turbines and compressors at conditions similar to actual engine conditions. The SECTF is comprised of a compressor testing cell and a turbine testing cell. Only the compressor testing cell is described. The capability of the facility, the overall facility design, the instrumentation used in the facility, and the data acquisition system are discussed in detail.

  3. Around Marshall

    NASA Image and Video Library

    1961-09-07

    At its founding, the Marshall Space Flight Center (MSFC) inherited the Army’s Jupiter and Redstone test stands, but much larger facilities were needed for the giant stages of the Saturn V. From 1960 to 1964, the existing stands were remodeled and a sizable new test area was developed. The new comprehensive test complex for propulsion and structural dynamics was unique within the nation and the free world, and they remain so today because they were constructed with foresight to meet the future as well as on going needs. Construction of the S-IC Static test stand complex began in 1961 in the west test area of MSFC, and was completed in 1964. The S-IC static test stand was designed to develop and test the 138-ft long and 33-ft diameter Saturn V S-IC first stage, or booster stage, weighing in at 280,000 pounds. Required to hold down the brute force of a 7,500,000-pound thrust produced by 5 F-1 engines, the S-IC static test stand was designed and constructed with the strength of hundreds of tons of steel and 12,000,000 pounds of cement, planted down to bedrock 40 feet below ground level. The foundation walls, constructed with concrete and steel, are 4 feet thick. The base structure consists of four towers with 40-foot-thick walls extending upward 144 feet above ground level. The structure was topped by a crane with a 135-foot boom. With the boom in the upright position, the stand was given an overall height of 405 feet, placing it among the highest structures in Alabama at the time. This photo shows the construction progress of the forms for the concrete foundation walls as of September 7, 1961.

  4. Modelling, Simulation and Construction of a DC/DC Boost Power Converter: A School Experimental System

    ERIC Educational Resources Information Center

    Silva-Ortigoza, R.; Silva-Ortigoza, G.; Hernandez-Guzman, V. M.; Saldana-Gonzalez, G.; Marcelino-Aranda, M.; Marciano-Melchor, M.

    2012-01-01

    We introduce a dc/dc boost power converter as a didactic prototype intended to support courses on electric circuit analysis experimentally. The corresponding mathematical model is obtained, the converter is designed and an experimental setup is described, constructed and tested. Simplicity of construction as well as low cost of components renders…

  5. Around Marshall

    NASA Image and Video Library

    1963-04-04

    At its founding, the Marshall Space Flight Center (MSFC) inherited the Army’s Jupiter and Redstone test stands, but much larger facilities were needed for the giant stages of the Saturn V. From 1960 to 1964, the existing stands were remodeled and a sizable new test area was developed. The new comprehensive test complex for propulsion and structural dynamics was unique within the nation and the free world, and they remain so today because they were constructed with foresight to meet the future as well as on going needs. Construction of the S-IC Static test stand complex began in 1961 in the west test area of MSFC, and was completed in 1964. The S-IC static test stand was designed to develop and test the 138-ft long and 33-ft diameter Saturn V S-IC first stage, or booster stage, weighing in at 280,000 pounds. Required to hold down the brute force of a 7,500,000-pound thrust produced by 5 F-1 engines, the S-IC static test stand was designed and constructed with the strength of hundreds of tons of steel and 12,000,000 pounds of cement, planted down to bedrock 40 feet below ground level. The foundation walls, constructed with concrete and steel, are 4 feet thick. The base structure consists of four towers with 40-foot-thick walls extending upward 144 feet above ground level. The structure was topped by a crane with a 135-foot boom. With the boom in the upright position, the stand was given an overall height of 405 feet, placing it among the highest structures in Alabama at the time. North of the massive S-IC test stand, the F-1 Engine test stand was built. Designed to assist in the development of the F-1 Engine, the F-1 test stand is a vertical engine firing test stand, 239 feet in elevation and 4,600 square feet in area at the base. Capability was provided for static firing of 1.5 million pounds of thrust using liquid oxygen and kerosene. Like the S-IC stand, the foundation of the F-1 stand is keyed into the bedrock approximately 40 feet below grade. This photo, taken April 4, 1963 depicts the construction of the F-1 test stand foundation walls.

  6. Around Marshall

    NASA Image and Video Library

    1963-04-17

    At its founding, the Marshall Space Flight Center (MSFC) inherited the Army’s Jupiter and Redstone test stands, but much larger facilities were needed for the giant stages of the Saturn V. From 1960 to 1964, the existing stands were remodeled and a sizable new test area was developed. The new comprehensive test complex for propulsion and structural dynamics was unique within the nation and the free world, and they remain so today because they were constructed with foresight to meet the future as well as on going needs. Construction of the S-IC Static test stand complex began in 1961 in the west test area of MSFC, and was completed in 1964. The S-IC static test stand was designed to develop and test the 138-ft long and 33-ft diameter Saturn V S-IC first stage, or booster stage, weighing in at 280,000 pounds. Required to hold down the brute force of a 7,500,000-pound thrust produced by 5 F-1 engines, the S-IC static test stand was designed and constructed with the strength of hundreds of tons of steel and 12,000,000 pounds of cement, planted down to bedrock 40 feet below ground level. The foundation walls, constructed with concrete and steel, are 4 feet thick. The base structure consists of four towers with 40-foot-thick walls extending upward 144 feet above ground level. The structure was topped by a crane with a 135-foot boom. With the boom in the upright position, the stand was given an overall height of 405 feet, placing it among the highest structures in Alabama at the time. North of the massive S-IC test stand, the F-1 Engine test stand was built. Designed to assist in the development of the F-1 Engine, the F-1 test stand is a vertical engine firing test stand, 239 feet in elevation and 4,600 square feet in area at the base. Capability was provided for static firing of 1.5 million pounds of thrust using liquid oxygen and kerosene. Like the S-IC stand, the foundation of the F-1 stand is keyed into the bedrock approximately 40 feet below grade. This photo, taken April 17, 1963 depicts the construction of the F-1 test stand foundation walls.

  7. Around Marshall

    NASA Image and Video Library

    1963-10-22

    At its founding, the Marshall Space Flight Center (MSFC) inherited the Army’s Jupiter and Redstone test stands, but much larger facilities were needed for the giant stages of the Saturn V. From 1960 to 1964, the existing stands were remodeled and a sizable new test area was developed. The new comprehensive test complex for propulsion and structural dynamics was unique within the nation and the free world, and they remain so today because they were constructed with foresight to meet the future as well as on going needs. Construction of the S-IC Static test stand complex began in 1961 in the west test area of MSFC, and was completed in 1964. The S-IC static test stand was designed to develop and test the 138-ft long and 33-ft diameter Saturn V S-IC first stage, or booster stage, weighing in at 280,000 pounds. Required to hold down the brute force of a 7,500,000-pound thrust produced by 5 F-1 engines, the S-IC static test stand was designed and constructed with the strength of hundreds of tons of steel and 12,000,000 pounds of cement, planted down to bedrock 40 feet below ground level. The foundation walls, constructed with concrete and steel, are 4 feet thick. The base structure consists of four towers with 40-foot-thick walls extending upward 144 feet above ground level. The structure was topped by a crane with a 135-foot boom. With the boom in the upright position, the stand was given an overall height of 405 feet, placing it among the highest structures in Alabama at the time. In addition to the stand itself, related facilities were constructed during this time. Northeast of the massive S-IC test stand, the F-1 Engine test stand was built. The F-1 test stand is a vertical engine firing test stand, 239 feet in elevation and 4,600 square feet in area at the base, and was designed to assist in the development of the F-1 Engine. Capability was provided for static firing of 1.5 million pounds of thrust using liquid oxygen and kerosene. Like the S-IC stand, the foundation of the F-1 stand is keyed into the bedrock approximately 40 feet below grade. This photo depicts the fuel tanks that housed kerosene and just beyond those is the F-1 test stand.

  8. Design, analysis and test verification of advanced encapsulation systems

    NASA Technical Reports Server (NTRS)

    Garcia, A., III

    1983-01-01

    A preliminary reduced variable master was constructed for pressure loading. A study of cell thickness versus cell stress was completed. Work is continuing on encapsulation of qualification modules. A 4 ft x 4 ft 'credit card' construction laminate was made.

  9. Design, analysis and test verification of advanced encapsulation systems

    NASA Astrophysics Data System (ADS)

    Garcia, A., III

    1983-02-01

    A preliminary reduced variable master was constructed for pressure loading. A study of cell thickness versus cell stress was completed. Work is continuing on encapsulation of qualification modules. A 4 ft x 4 ft 'credit card' construction laminate was made.

  10. Holographic optical elements: Fabrication and testing

    NASA Technical Reports Server (NTRS)

    Zech, R. G.; Shareck, M.; Ralston, L. M.

    1974-01-01

    The basic properties and use of holographic optical elements were investigated to design and construct wide-angle, Fourier-transform holographic optical systems for use in a Bragg-effect optical memory. The performance characteristics are described along with the construction of the holographic system.

  11. Conceptual design of the MHD Engineering Test Facility

    NASA Technical Reports Server (NTRS)

    Bents, D. J.; Bercaw, R. W.; Burkhart, J. A.; Mroz, T. S.; Rigo, H. S.; Pearson, C. V.; Warinner, D. K.; Hatch, A. M.; Borden, M.; Giza, D. A.

    1981-01-01

    The reference conceptual design of the MHD engineering test facility, a prototype 200 MWe coal-fired electric generating plant designed to demonstrate the commerical feasibility of open cycle MHD is summarized. Main elements of the design are identified and explained, and the rationale behind them is reviewed. Major systems and plant facilities are listed and discussed. Construction cost and schedule estimates are included and the engineering issues that should be reexamined are identified.

  12. Predicting Student Grade Point Average at a Community College from Scholastic Aptitude Tests and from Measures Representing Three Constructs in Vroom's Expectancy Theory Model of Motivation.

    ERIC Educational Resources Information Center

    Malloch, Douglas C.; Michael, William B.

    1981-01-01

    This study was designed to determine whether an unweighted linear combination of community college students' scores on standardized achievement tests and a measure of motivational constructs derived from Vroom's expectance theory model of motivation was predictive of academic success (grade point average earned during one quarter of an academic…

  13. An Evaluation of the Kernel Equating Method: A Special Study with Pseudotests Constructed from Real Test Data. Research Report. ETS RR-06-02

    ERIC Educational Resources Information Center

    von Davier, Alina A.; Holland, Paul W.; Livingston, Samuel A.; Casabianca, Jodi; Grant, Mary C.; Martin, Kathleen

    2006-01-01

    This study examines how closely the kernel equating (KE) method (von Davier, Holland, & Thayer, 2004a) approximates the results of other observed-score equating methods--equipercentile and linear equatings. The study used pseudotests constructed of item responses from a real test to simulate three equating designs: an equivalent groups (EG)…

  14. Around Marshall

    NASA Image and Video Library

    1963-09-25

    At its founding, the Marshall Space Flight Center (MSFC) inherited the Army’s Jupiter and Redstone test stands, but much larger facilities were needed for the giant stages of the Saturn V. From 1960 to 1964, the existing stands were remodeled and a sizable new test area was developed. The new comprehensive test complex for propulsion and structural dynamics was unique within the nation and the free world, and they remain so today because they were constructed with foresight to meet the future as well as on going needs. Construction of the S-IC Static test stand complex began in 1961 in the west test area of MSFC, and was completed in 1964. The S-IC static test stand was designed to develop and test the 138-ft long and 33-ft diameter Saturn V S-IC first stage, or booster stage, weighing in at 280,000 pounds. Required to hold down the brute force of a 7,500,000-pound thrust produced by 5 F-1 engines, the S-IC static test stand was designed and constructed with the strength of hundreds of tons of steel and 12,000,000 pounds of cement, planted down to bedrock 40 feet below ground level. The foundation walls, constructed with concrete and steel, are 4 feet thick. The base structure consists of four towers with 40-foot-thick walls extending upward 144 feet above ground level. The structure was topped by a crane with a 135-foot boom. With the boom in the upright position, the stand was given an overall height of 405 feet, placing it among the highest structures in Alabama at the time. In addition to the stand itself, related facilities were constructed during this time. Built to the northeast of the stand was a newly constructed Pump House. Its function was to provide water to the stand to prevent melting damage during testing. The water was sprayed through small holes in the stand’s 1900 ton flame deflector at the rate of 320,000 gallons per minute. This photograph, taken September 25, 1963, depicts the construction progress of the Pump House and massive round water tanks on the right.

  15. 78 FR 69943 - Anthropomorphic Test Devices; Q3s 3-Year-Old Child Side Impact Test Dummy, Incorporation by...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-21

    ... design and by July 2007 Build Level C was released. b. Developments In 2007, the Occupant Safety Research... reference a parts list, a set of design drawings, and a ``Procedures for Assembly, Disassembly and Inspection (PADI)'' document, to ensure that all Q3s dummies are the same in their design and construction.\\2...

  16. Table-Top Robotics for Engineering Design

    ERIC Educational Resources Information Center

    Wilczynski, Vincent; Dixon, Gregg; Ford, Eric

    2005-01-01

    The Mechanical Engineering Section at the U.S. Coast Guard Academy has developed a comprehensive activity based course to introduce second year students to mechanical engineering design. The culminating design activity for the course requires students to design, construct and test robotic devices that complete engineering challenges. Teams of…

  17. 33 CFR 159.101 - Testing: general.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 33 Navigation and Navigable Waters 2 2011-07-01 2011-07-01 false Testing: general. 159.101 Section 159.101 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) POLLUTION MARINE SANITATION DEVICES Design, Construction, and Testing § 159.101 Testing: general. Unless...

  18. Design, construction, and testing of the direct absorption receiver panel research experiment

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Chavez, J.M.; Rush, E.E.; Matthews, C.W.

    1990-01-01

    A panel research experiment (PRE) was designed, built, and tested as a scaled-down model of a direct absorption receiver (DAR). The PRE is a 3-MW{sub t}DAR experiment that will allow flow testing with molten nitrate salt and provide a test bed for DAR testing with actual solar heating. In a solar central receiver system DAR, the heat absorbing fluid (a blackened molten nitrate salt) flows in a thin film down a vertical panel (rather than through tubes as in conventional receiver designs) and absorbs the concentrated solar flux directly. The ability of the flowing salt film to absorb flux directly.more » The ability of the flowing salt film to absorb the incident solar flux depends on the panel design, hydraulic and thermal fluid flow characteristics, and fluid blackener properties. Testing of the PRE is being conducted to demonstrate the engineering feasibility of the DAR concept. The DAR concept is being investigated because it offers numerous potential performance and economic advantages for production of electricity when compared to other solar receiver designs. The PRE utilized a 1-m wide by 6-m long absorber panel. The salt flow tests are being used to investigate component performance, panel deformations, and fluid stability. Salt flow testing has demonstrated that all the DAR components work as designed and that there are fluid stability issues that need to be addressed. Future solar testing will include steady-state and transient experiments, thermal loss measurements, responses to severe flux and temperature gradients and determination of peak flux capability, and optimized operation. In this paper, we describe the design, construction, and some preliminary flow test results of the Panel Research Experiment. 11 refs., 8 figs., 2 tabs.« less

  19. 30 CFR 18.68 - Tests for intrinsic safety.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... requirements may be added at any time if features of construction or use or both indicate them to be necessary.... They shall be designed to withstand a test voltage of 1,500 volts. (4) Intrinsically safe circuits shall be so designed that after failure of a single component, and subsequent failures resulting from...

  20. 30 CFR 18.68 - Tests for intrinsic safety.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... requirements may be added at any time if features of construction or use or both indicate them to be necessary.... They shall be designed to withstand a test voltage of 1,500 volts. (4) Intrinsically safe circuits shall be so designed that after failure of a single component, and subsequent failures resulting from...

  1. 30 CFR 18.68 - Tests for intrinsic safety.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... requirements may be added at any time if features of construction or use or both indicate them to be necessary.... They shall be designed to withstand a test voltage of 1,500 volts. (4) Intrinsically safe circuits shall be so designed that after failure of a single component, and subsequent failures resulting from...

  2. 30 CFR 18.68 - Tests for intrinsic safety.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... requirements may be added at any time if features of construction or use or both indicate them to be necessary.... They shall be designed to withstand a test voltage of 1,500 volts. (4) Intrinsically safe circuits shall be so designed that after failure of a single component, and subsequent failures resulting from...

  3. 40 CFR 270.20 - Specific part B information requirements for land treatment facilities.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... field test that will be conducted, including: (i) The type of test (e.g., column leaching, degradation...: (1) The wastes to be land treated; (2) Design measures and operating practices necessary to maximize... treatment zone; (c) A description of how the unit is or will be designed, constructed, operated, and...

  4. 40 CFR 270.20 - Specific part B information requirements for land treatment facilities.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... field test that will be conducted, including: (i) The type of test (e.g., column leaching, degradation...: (1) The wastes to be land treated; (2) Design measures and operating practices necessary to maximize... treatment zone; (c) A description of how the unit is or will be designed, constructed, operated, and...

  5. 40 CFR 270.20 - Specific part B information requirements for land treatment facilities.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... field test that will be conducted, including: (i) The type of test (e.g., column leaching, degradation...: (1) The wastes to be land treated; (2) Design measures and operating practices necessary to maximize... treatment zone; (c) A description of how the unit is or will be designed, constructed, operated, and...

  6. 40 CFR 270.20 - Specific part B information requirements for land treatment facilities.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... field test that will be conducted, including: (i) The type of test (e.g., column leaching, degradation...: (1) The wastes to be land treated; (2) Design measures and operating practices necessary to maximize... treatment zone; (c) A description of how the unit is or will be designed, constructed, operated, and...

  7. 33 CFR Appendix B to Part 154 - Standard Specification for Tank Vent Flame Arresters

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 1.1This standard provides the minimum requirements for design, construction, performance and testing... with a maximum experimental safe gap (MESG) below 0.9 millimeters. Flame arresters protecting such... Design, Testing and Locating of Devices to Prevent the Passage of Flame into Cargo Tanks in Tankers. 3.3...

  8. 33 CFR Appendix B to Part 154 - Standard Specification for Tank Vent Flame Arresters

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 1.1This standard provides the minimum requirements for design, construction, performance and testing... with a maximum experimental safe gap (MESG) below 0.9 millimeters. Flame arresters protecting such... Design, Testing and Locating of Devices to Prevent the Passage of Flame into Cargo Tanks in Tankers. 3.3...

  9. 33 CFR Appendix B to Part 154 - Standard Specification for Tank Vent Flame Arresters

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 1.1This standard provides the minimum requirements for design, construction, performance and testing... with a maximum experimental safe gap (MESG) below 0.9 millimeters. Flame arresters protecting such... Design, Testing and Locating of Devices to Prevent the Passage of Flame into Cargo Tanks in Tankers. 3.3...

  10. 33 CFR Appendix B to Part 154 - Standard Specification for Tank Vent Flame Arresters

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 1.1This standard provides the minimum requirements for design, construction, performance and testing... with a maximum experimental safe gap (MESG) below 0.9 millimeters. Flame arresters protecting such... Design, Testing and Locating of Devices to Prevent the Passage of Flame into Cargo Tanks in Tankers. 3.3...

  11. Method of Construction for Geopolymer Soil Stabilized Platforms

    DTIC Science & Technology

    2017-12-20

    of the geopolymer core compressive strength tests. The degree of seepage varied from pavement to pavement due to mix design and additives, ultimately...Department of the Army position unless so designated by other authorized documents. DESTROY THIS REPORT WHEN NO LONGER NEEDED. DO NOT RETURN IT TO THE...20 3.5 Test pavement ................................................................................................ 23

  12. 29 CFR 1926.752 - Site layout, site-specific erection plan and construction sequence.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... standard test method of field-cured samples, either 75 percent of the intended minimum compressive design... the basis of an appropriate ASTM standard test method of field-cured samples, either 75 percent of the intended minimum compressive design strength or sufficient strength to support the loads imposed during...

  13. 29 CFR 1926.752 - Site layout, site-specific erection plan and construction sequence.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... standard test method of field-cured samples, either 75 percent of the intended minimum compressive design... the basis of an appropriate ASTM standard test method of field-cured samples, either 75 percent of the intended minimum compressive design strength or sufficient strength to support the loads imposed during...

  14. 29 CFR 1926.752 - Site layout, site-specific erection plan and construction sequence.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... standard test method of field-cured samples, either 75 percent of the intended minimum compressive design... the basis of an appropriate ASTM standard test method of field-cured samples, either 75 percent of the intended minimum compressive design strength or sufficient strength to support the loads imposed during...

  15. 29 CFR 1926.752 - Site layout, site-specific erection plan and construction sequence.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... standard test method of field-cured samples, either 75 percent of the intended minimum compressive design... the basis of an appropriate ASTM standard test method of field-cured samples, either 75 percent of the intended minimum compressive design strength or sufficient strength to support the loads imposed during...

  16. 29 CFR 1926.752 - Site layout, site-specific erection plan and construction sequence.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... standard test method of field-cured samples, either 75 percent of the intended minimum compressive design... the basis of an appropriate ASTM standard test method of field-cured samples, either 75 percent of the intended minimum compressive design strength or sufficient strength to support the loads imposed during...

  17. The Socratic Method: Empirical Assessment of a Psychology Capstone Course

    ERIC Educational Resources Information Center

    Burns, Lawrence R.; Stephenson, Paul L.; Bellamy, Katy

    2016-01-01

    Although students make some epistemological progress during college, most graduate without developing meaning-making strategies that reflect an understanding that knowledge is socially constructed. Using a pre-test-post-test design and a within-subjects 2 × 2 mixed-design ANOVA, this study reports on empirical findings which support the Socratic…

  18. A More Powerful Test in Three-Level Cluster Randomized Designs

    ERIC Educational Resources Information Center

    Konstantopoulos, Spyros

    2011-01-01

    Field experiments that involve nested structures frequently assign treatment conditions to entire groups (such as schools). A key aspect of the design of such experiments includes knowledge of the clustering effects that are often expressed via intraclass correlation. This study provides methods for constructing a more powerful test for the…

  19. 49 CFR 178.337-16 - Testing.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... Containers for Motor Vehicle Transportation § 178.337-16 Testing. (a) Inspection and tests. Inspection of materials of construction of the cargo tank and its appurtenances and original test and inspection of the... least twice the cargo tank design pressure. (b) Weld testing and inspection. (1) Each cargo tank...

  20. 49 CFR 178.337-16 - Testing.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... Containers for Motor Vehicle Transportation § 178.337-16 Testing. (a) Inspection and tests. Inspection of materials of construction of the cargo tank and its appurtenances and original test and inspection of the... least twice the cargo tank design pressure. (b) Weld testing and inspection. (1) Each cargo tank...

  1. 49 CFR 178.337-16 - Testing.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... Containers for Motor Vehicle Transportation § 178.337-16 Testing. (a) Inspection and tests. Inspection of materials of construction of the cargo tank and its appurtenances and original test and inspection of the... least twice the cargo tank design pressure. (b) Weld testing and inspection. (1) Each cargo tank...

  2. 49 CFR 178.337-16 - Testing.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Containers for Motor Vehicle Transportation § 178.337-16 Testing. (a) Inspection and tests. Inspection of materials of construction of the cargo tank and its appurtenances and original test and inspection of the... least twice the cargo tank design pressure. (b) Weld testing and inspection. (1) Each cargo tank...

  3. Interface Message Processors for the ARPA Computer Network

    DTIC Science & Technology

    1975-04-01

    Pluribus IMP construction and checkout; sizeable changes to the i*4P message-processing algorithms: and Satellite IMP issues. The IMP message...extremely low cost modification design. We have begun to consider changes to the MLC design which would enable the MLC to suppress continuous breaks...existing authentication mechanisms need not make these changes . 2.7 Other Topics During the first quarter BBN constructed an environmental test chamber

  4. SENSE IT: Teaching STEM Principles to Middle and High School Students through the Design, Construction and Deployment of Water Quality Sensors

    ERIC Educational Resources Information Center

    Hotaling, Liesl; Lowes, Susan; Stolkin, Rustam; Lin, Peiyi; Bonner, James; Kirkey, William; Ojo, Temitope

    2012-01-01

    This paper describes the structure and impact of an NSF-funded ITEST project designed to enrich science, technology, engineering, and mathematics (STEM) education using educational modules that teach students to construct, program, and test a series of sensors used to monitor water quality. During the two years of the SENSE IT project, over 30…

  5. Double Dutch: A Tool for Designing Combinatorial Libraries of Biological Systems.

    PubMed

    Roehner, Nicholas; Young, Eric M; Voigt, Christopher A; Gordon, D Benjamin; Densmore, Douglas

    2016-06-17

    Recently, semirational approaches that rely on combinatorial assembly of characterized DNA components have been used to engineer biosynthetic pathways. In practice, however, it is not practical to assemble and test millions of pathway variants in order to elucidate how different DNA components affect the behavior of a pathway. To address this challenge, we apply a rigorous mathematical approach known as design of experiments (DOE) that can be used to construct empirical models of system behavior without testing all variants. To support this approach, we have developed a tool named Double Dutch, which uses a formal grammar and heuristic algorithms to automate the process of DOE library design. Compared to designing by hand, Double Dutch enables users to more efficiently and scalably design libraries of pathway variants that can be used in a DOE framework and uniquely provides a means to flexibly balance design considerations of statistical analysis, construction cost, and risk of homologous recombination, thereby demonstrating the utility of automating decision making when faced with complex design trade-offs.

  6. Construction of Response Surface with Higher Order Continuity and Its Application to Reliability Engineering

    NASA Technical Reports Server (NTRS)

    Krishnamurthy, T.; Romero, V. J.

    2002-01-01

    The usefulness of piecewise polynomials with C1 and C2 derivative continuity for response surface construction method is examined. A Moving Least Squares (MLS) method is developed and compared with four other interpolation methods, including kriging. First the selected methods are applied and compared with one another in a two-design variables problem with a known theoretical response function. Next the methods are tested in a four-design variables problem from a reliability-based design application. In general the piecewise polynomial with higher order derivative continuity methods produce less error in the response prediction. The MLS method was found to be superior for response surface construction among the methods evaluated.

  7. NCAT test track design, construction, and performance

    DOT National Transportation Integrated Search

    2002-11-01

    Empirical laboratory tests have been used for years to test hot mix asphalt (HMA) to determine the potential for various mixtures to perform well. As the amount of traffic has increased (higher volumes, higher loads, and increased tire pressures) the...

  8. NASA/Marshall's lithium battery applications

    NASA Technical Reports Server (NTRS)

    Paschal, L. E.

    1980-01-01

    A general lithium battery is described and a summary of lithium battery applications is presented. Four aspects of a particular lithium battery, the inducement environmental contamination monitoring battery, are discussed-design and construction details, thermal vacuum tests, projection tests, and acceptance tests.

  9. Development of assembly techniques for fire resistant aircraft interior panels

    NASA Technical Reports Server (NTRS)

    Lee, S. C. S.

    1978-01-01

    Ten NASA Type A fire resistant aircraft interior panels were fabricated and tested to develop assembly techniques. These techiques were used in the construction of a full scale lavatory test structure for flame propagation testing. The Type A panel is of sandwich construction consisting of Nomex honeycomb filled with quinone dioxime foam, and bismaleimide/glass face sheets bonded to the core with polyimide film adhesive. The materials selected and the assembly techniques developed for the lavatory test structure were designed for obtaining maximum fire containment with minimum smoke and toxic emission.

  10. 46 CFR 162.060-34 - Test Report requirements.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... conditions; (2) Experimental design; (3) Methods and procedures; and (4) Results and discussion. (f... requirements of 33 CFR part 151, subparts C and D; (ii) Is designed and constructed according to the...

  11. 46 CFR 162.060-34 - Test Report requirements.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... conditions; (2) Experimental design; (3) Methods and procedures; and (4) Results and discussion. (f... requirements of 33 CFR part 151, subparts C and D; (ii) Is designed and constructed according to the...

  12. 46 CFR 162.060-34 - Test Report requirements.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... conditions; (2) Experimental design; (3) Methods and procedures; and (4) Results and discussion. (f... requirements of 33 CFR part 151, subparts C and D; (ii) Is designed and constructed according to the...

  13. Test Plan for Cask Identification Detector

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Rauch, Eric Benton

    2016-09-29

    This document serves to outline the testing of a Used Fuel Cask Identification Detector (CID) currently being designed under the DOE-NE MPACT Campaign. A bench-scale prototype detector will be constructed and tested using surrogate neutron sources. The testing will serve to inform the design of the full detector that is to be used as a way of fingerprinting used fuel storage casks based on the neutron signature produced by the used fuel inside the cask.

  14. Long-term performance of a hot in-place recycling project final report.

    DOT National Transportation Integrated Search

    2016-08-01

    This report documents the construction and long-term performance of a hot in-place recycled (HIPR) : project on SR 542. HIPR project selection, mix design, construction and testing are described. It was shown that : the HIPR process successfully reha...

  15. Evaluation of experimental flexible pavements : interim report no. 1, construction of Altavista Bypass experimental pavement.

    DOT National Transportation Integrated Search

    1974-01-01

    Deflection tests conducted during the construction and shortly after the completion of a large experimental pavement project are reported. Four different pavement designs, as follows, are compared: 1. 6-inch cement stabilized subgrade, 6-inch crushed...

  16. Summary of NASA Lewis Research Center solar heating and cooling and wind energy programs

    NASA Technical Reports Server (NTRS)

    Vernon, R. W.

    1975-01-01

    Plans for the construction and operation of a solar heating and cooling system in conjunction with a office building being constructed at Langley Research Center, are discussed. Supporting research and technology includes: testing of solar collectors with a solar simulator, outdoor testing of collectors, property measurements of selective and nonselective coatings for solar collectors, and a solar model-systems test loop. The areas of a wind energy program that are being conducted include: design and operation of a 100-kW experimental wind generator, industry-designed and user-operated wind generators in the range of 50 to 3000 kW, and supporting research and technology for large wind energy systems. An overview of these activities is provided.

  17. Electron Lens Construction for the Integrable Optics Test Accelerator at Fermilab

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    McGee, Mike; Carlson, Kermit; Nobrega, Lucy

    The Integrable Optics Test Accelerator (IOTA) is proposed for operation at Fermilab. The goal of IOTA is to create practical nonlinear accelerator focusing systems with a large frequency spread and stable particle motion. The IOTA is a 40 m circumference, 150 MeV (e-), 2.5 MeV (p⁺) diagnostic test ring. Construction of an electron lens for IOTA is necessary for both electron and proton operation. Components required for the Electron Lens design include; a 0.8 T conventional water-cooled main solenoid, and magnetic bending and focusing elements. The foundation of the design relies on repurposing the Fermilab Tevatron Electron Lens II (TELII)more » gun and collector under ultra-high vacuum (UHV) conditions.« less

  18. Carbon Mineralization by Aqueous Precipitation for Beneficial Use of CO2 from Flue Gas

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Devenney, Martin; Gilliam, Ryan; Seeker, Randy

    2013-08-01

    The objective of this project is to demonstrate an innovative process to mineralize CO2 from flue gas directly to reactive carbonates and maximize the value and versatility of its beneficial use products. The program scope includes the design, construction, and testing of a CO2 Conversion to Material Products (CCMP) Pilot Demonstration Plant utilizing CO2 from the flue gas of a power production facility in Moss Landing, CA. This topical report covers Subphase 2a which is the design phase of pilot demonstration subsystems. Materials of construction have been selected and proven in both lab scale and prototype testing to be acceptablemore » for the reagent conditions of interest. The target application for the reactive carbonate material has been selected based upon small-scale feasibility studies and the design of a continuous fiber board production line has been completed. The electrochemical cell architecture and components have been selected based upon both lab scale and prototype testing. The appropriate quality control and diagnostic techniques have been developed and tested along with the required instrumentation and controls. Finally the demonstrate site infrastructure, NEPA categorical exclusion, and permitting is all ready for the construction and installation of the new units and upgrades.« less

  19. IFMIF: overview of the validation activities

    NASA Astrophysics Data System (ADS)

    Knaster, J.; Arbeiter, F.; Cara, P.; Favuzza, P.; Furukawa, T.; Groeschel, F.; Heidinger, R.; Ibarra, A.; Matsumoto, H.; Mosnier, A.; Serizawa, H.; Sugimoto, M.; Suzuki, H.; Wakai, E.

    2013-11-01

    The Engineering Validation and Engineering Design Activities (EVEDA) for the International Fusion Materials Irradiation Facility (IFMIF), an international collaboration under the Broader Approach Agreement between Japan Government and EURATOM, aims at allowing a rapid construction phase of IFMIF in due time with an understanding of the cost involved. The three main facilities of IFMIF (1) the Accelerator Facility, (2) the Target Facility and (3) the Test Facility are the subject of validation activities that include the construction of either full scale prototypes or smartly devised scaled down facilities that will allow a straightforward extrapolation to IFMIF needs. By July 2013, the engineering design activities of IFMIF matured with the delivery of an Intermediate IFMIF Engineering Design Report (IIEDR) supported by experimental results. The installation of a Linac of 1.125 MW (125 mA and 9 MeV) of deuterons started in March 2013 in Rokkasho (Japan). The world's largest liquid Li test loop is running in Oarai (Japan) with an ambitious experimental programme for the years ahead. A full scale high flux test module that will house ∼1000 small specimens developed jointly in Europe and Japan for the Fusion programme has been constructed by KIT (Karlsruhe) together with its He gas cooling loop. A full scale medium flux test module to carry out on-line creep measurement has been validated by CRPP (Villigen).

  20. The Universal Design for Play Tool: Establishing Validity and Reliability

    ERIC Educational Resources Information Center

    Ruffino, Amy Goetz; Mistrett, Susan G.; Tomita, Machiko; Hajare, Poonam

    2006-01-01

    The Universal Design for Play (UDP) Tool is an instrument designed to evaluate the presence of universal design (UD) features in toys. This study evaluated its psychometric properties, including content validity, construct validity, and test-retest reliability. The UDP tool was designed to assist in selecting toys most appropriate for children…

  1. Around Marshall

    NASA Image and Video Library

    1972-01-01

    This is a cutaway illustration of the Neutral Buoyancy Simulator (NBS) at the Marshall Space Flight Center (MSFC ). The MSFC NBS provided an excellent environment for testing hardware to examine how it would operate in space and for evaluating techniques for space construction and spacecraft servicing. Here, engineers, designers, and astronauts performed various tests to develop basic concepts, preliminary designs, final designs, and crew procedures. The NBS was constructed of welded steel with polyester-resin coating. The water tank was 75-feet (22.9- meters) in diameter, 40-feet (12.2-meters) deep, and held 1.32 million gallons of water. Since it opened for operation in 1968, the NBS had supported a number of successful space missions, such as the Skylab, Solar Maximum Mission Satellite, Marned Maneuvering Unit, Experimental Assembly of Structures in Extravehicular Activity/Assembly Concept for Construction of Erectable Space Structures (EASE/ACCESS), the Hubble Space Telescope, and the Space Station. The function of the MSFC NBS was moved to the larger simulator at the Johnson Space Center and is no longer operational.

  2. Engineering geology studies in the National Petroleum Reserve, Alaska

    USGS Publications Warehouse

    Kachadoorian, Reuben; Crory, F.E.

    1984-01-01

    Engineering geology studies were conducted in direct support of the exploration program in the National Petroleum Reserve, Alaska. The studies included laboratory and field tests and observations to address design and construction problems of airfields, roads, drill pads and foundations, and to evaluate their actual performance. Permafrost containing large amounts of near surface ground ice as wedges, masses, and intergranular ice, required that all construction activity not disturb the thermal regime of the ground surface, which could lead to thaw of permafrost and ground subsidence. Summer activity, therefore was not allowable, yet the winter climate was so harsh that winter work was slow and inefficient. To allow summer operations at well sites planned for all year activity, it was necessary to adapt existing techniques for arctic construction and to devise new ones. The design and construction of facilities at the deep exploration wells at Inigok, Tunalik, and Lisburne posed the greatest challenge. These sites, requiring a year or more to drill, could only be attempted if continuous access to drilling and logistic supplies could be assured throughout the year, including the possibility of bringing in another drill rig, in the event of a blowout. Thus all-seasons airstrips were required at these wells. Sufficient quantities of local gravel were not readily available at the Inigok and Tunalik sites to construct the airstrips with the required 6 feet or more of gravel to prevent the underlying permafrost from thawing. Therefore, insulation was used to maintain the subbase of local sands in a continuously frozen state, which in turn was overlain by 15 inches of gravel or sandy gravel. Tests at the U.S. Army Waterways Experimental Station defined the minimum thickness of gravel required above the insulation to provide the desired bearing capacity for the C-130 type aircraft without crushing the insulation. Field testing also included the evaluation of another design option, using military landing mat underlain by insulation. Temperature recording devices were installed beneath the landing mat test sections, insulated runways, roads, drill pads, and reserve pits, to monitor the actual conditions and confirm the design assumptions. Investigations of thaw-settlement, erosion, and revegetation of all areas affected by construction were also conducted in anticipation of abandoning the sites, or, upgrading the facilities in the event the design life was extended.

  3. Utility-based designs for randomized comparative trials with categorical outcomes

    PubMed Central

    Murray, Thomas A.; Thall, Peter F.; Yuan, Ying

    2016-01-01

    A general utility-based testing methodology for design and conduct of randomized comparative clinical trials with categorical outcomes is presented. Numerical utilities of all elementary events are elicited to quantify their desirabilities. These numerical values are used to map the categorical outcome probability vector of each treatment to a mean utility, which is used as a one-dimensional criterion for constructing comparative tests. Bayesian tests are presented, including fixed sample and group sequential procedures, assuming Dirichlet-multinomial models for the priors and likelihoods. Guidelines are provided for establishing priors, eliciting utilities, and specifying hypotheses. Efficient posterior computation is discussed, and algorithms are provided for jointly calibrating test cutoffs and sample size to control overall type I error and achieve specified power. Asymptotic approximations for the power curve are used to initialize the algorithms. The methodology is applied to re-design a completed trial that compared two chemotherapy regimens for chronic lymphocytic leukemia, in which an ordinal efficacy outcome was dichotomized and toxicity was ignored to construct the trial’s design. The Bayesian tests also are illustrated by several types of categorical outcomes arising in common clinical settings. Freely available computer software for implementation is provided. PMID:27189672

  4. Silicon micro-fabricated miniature polymer electrolyte fuel cells

    NASA Astrophysics Data System (ADS)

    Kelley, Shawn Christopher

    2000-10-01

    The present thesis relates the design, fabrication, and testing of a unique type of silicon-based, miniature fuel cell. The fuel cell electrodes were constructed using standard silicon micro-fabrication techniques, and were used to construct miniature polymer electrolyte fuel cells (PEFCs) using NafionRTM. During testing, methanol and oxygen were the common reactants, but hydrogen and oxygen could be used as well. A novel form of an electrodeposited Pt:Ru alloy was developed for use as a methanol electrooxidation catalyst in the mini-PEFCs. An optimized mini-PEFC design was developed, tested, and compared with large PEFCs on the basis of performance. Mini-PEFC performance was equivalent to that of large PEFCs when scaled for active-area, but was limited by the function of the oxygen electrode. The rate of methanol crossover in a methanol/oxygen mini-PEFC was predicted using Fick's first law and the electrode chip feed-hole area. It was shown that the present mini-PEFC design could function as a fuel cell material test structure. Additionally, the mini-PEFCs were tested as two-cell stacks and as methanol sensors. The miniature, silicon-based PEFCs developed here successfully incorporate the essential aspects of a large PEFC in a smaller, simpler design.

  5. 76 FR 39133 - Agency Information Collection Activities: Proposed Collection; Comment Request

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-05

    ... assess the adequacy of proposed seismic design bases and the design bases for other site hazards for... sited, designed, constructed, and maintained to withstand geologic hazards, such as faulting, seismic... potential man-made hazards will be appropriately accounted for in the design of nuclear power and test...

  6. 33 CFR 159.103 - Vibration test.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 33 Navigation and Navigable Waters 2 2011-07-01 2011-07-01 false Vibration test. 159.103 Section 159.103 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) POLLUTION MARINE SANITATION DEVICES Design, Construction, and Testing § 159.103 Vibration test. The device...

  7. 33 CFR 159.109 - Pressure test.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 33 Navigation and Navigable Waters 2 2011-07-01 2011-07-01 false Pressure test. 159.109 Section 159.109 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) POLLUTION MARINE SANITATION DEVICES Design, Construction, and Testing § 159.109 Pressure test. Any sewage...

  8. Study directed at development of an implantable biotelemetry ion detector

    NASA Technical Reports Server (NTRS)

    Hanley, L. D.; Kress, D.

    1971-01-01

    A literature search was conducted to currently update known information in the field of ion-selective electrodes. The review attempts to identify present trends in cation and anions selective electrodes pertinent to the area of bioimplantable units. An electronic circuit was designed to provide the high impedance interface between the ion-selective sensors and signal-processing equipment. The resulting design emphasized the need for low power and miniaturization. Many of the circuits were constructed and used to evaluate the ion-selective electrodes. A cuvette capable of holding the ion-selective and the reference electrodes was designed and constructed. This equipment was used to evaluate commercially available ion-selective electrodes and the electrodes designed and constructed in the study. The results of the electrode tests are included.

  9. Learning from instructional explanations: effects of prompts based on the active-constructive-interactive framework.

    PubMed

    Roelle, Julian; Müller, Claudia; Roelle, Detlev; Berthold, Kirsten

    2015-01-01

    Although instructional explanations are commonly provided when learners are introduced to new content, they often fail because they are not integrated into effective learning activities. The recently introduced active-constructive-interactive framework posits an effectiveness hierarchy in which interactive learning activities are at the top; these are then followed by constructive and active learning activities, respectively. Against this background, we combined instructional explanations with different types of prompts that were designed to elicit these learning activities and tested the central predictions of the active-constructive-interactive framework. In Experiment 1, N = 83 students were randomly assigned to one of four combinations of instructional explanations and prompts. To test the active < constructive learning hypothesis, the learners received either (1) complete explanations and engaging prompts designed to elicit active activities or (2) explanations that were reduced by inferences and inference prompts designed to engage learners in constructing the withheld information. Furthermore, in order to explore how interactive learning activities can be elicited, we gave the learners who had difficulties in constructing the prompted inferences adapted remedial explanations with either (3) unspecific engaging prompts or (4) revision prompts. In support of the active < constructive learning hypothesis, we found that the learners who received reduced explanations and inference prompts outperformed the learners who received complete explanations and engaging prompts. Moreover, revision prompts were more effective in eliciting interactive learning activities than engaging prompts. In Experiment 2, N = 40 students were randomly assigned to either (1) a reduced explanations and inference prompts or (2) a reduced explanations and inference prompts plus adapted remedial explanations and revision prompts condition. In support of the constructive < interactive learning hypothesis, the learners who received adapted remedial explanations and revision prompts as add-ons to reduced explanations and inference prompts acquired more conceptual knowledge.

  10. Learning from Instructional Explanations: Effects of Prompts Based on the Active-Constructive-Interactive Framework

    PubMed Central

    Roelle, Julian; Müller, Claudia; Roelle, Detlev; Berthold, Kirsten

    2015-01-01

    Although instructional explanations are commonly provided when learners are introduced to new content, they often fail because they are not integrated into effective learning activities. The recently introduced active-constructive-interactive framework posits an effectiveness hierarchy in which interactive learning activities are at the top; these are then followed by constructive and active learning activities, respectively. Against this background, we combined instructional explanations with different types of prompts that were designed to elicit these learning activities and tested the central predictions of the active-constructive-interactive framework. In Experiment 1, N = 83 students were randomly assigned to one of four combinations of instructional explanations and prompts. To test the active < constructive learning hypothesis, the learners received either (1) complete explanations and engaging prompts designed to elicit active activities or (2) explanations that were reduced by inferences and inference prompts designed to engage learners in constructing the withheld information. Furthermore, in order to explore how interactive learning activities can be elicited, we gave the learners who had difficulties in constructing the prompted inferences adapted remedial explanations with either (3) unspecific engaging prompts or (4) revision prompts. In support of the active < constructive learning hypothesis, we found that the learners who received reduced explanations and inference prompts outperformed the learners who received complete explanations and engaging prompts. Moreover, revision prompts were more effective in eliciting interactive learning activities than engaging prompts. In Experiment 2, N = 40 students were randomly assigned to either (1) a reduced explanations and inference prompts or (2) a reduced explanations and inference prompts plus adapted remedial explanations and revision prompts condition. In support of the constructive < interactive learning hypothesis, the learners who received adapted remedial explanations and revision prompts as add-ons to reduced explanations and inference prompts acquired more conceptual knowledge. PMID:25853629

  11. Are we really measuring what we say we're measuring? Using video techniques to supplement traditional construct validation procedures.

    PubMed

    Podsakoff, Nathan P; Podsakoff, Philip M; Mackenzie, Scott B; Klinger, Ryan L

    2013-01-01

    Several researchers have persuasively argued that the most important evidence to consider when assessing construct validity is whether variations in the construct of interest cause corresponding variations in the measures of the focal construct. Unfortunately, the literature provides little practical guidance on how researchers can go about testing this. Therefore, the purpose of this article is to describe how researchers can use video techniques to test whether their scales measure what they purport to measure. First, we discuss how researchers can develop valid manipulations of the focal construct that they hope to measure. Next, we explain how to design a study to use this manipulation to test the validity of the scale. Finally, comparing and contrasting traditional and contemporary perspectives on validation, we discuss the advantages and limitations of video-based validation procedures. PsycINFO Database Record (c) 2013 APA, all rights reserved.

  12. Results of Laboratory Tests of the Filtration Characteristics of Clay-Cement Concrete

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sol’skii, S. V., E-mail: solskiysv@vniig.ru; Lopatina, M. G., E-mail: LoptainaMG@vniig.ru; Legina, E. E.

    Laboratory studies of the filtration characteristics of clay-cement concrete materials for constructing filtering diaphragms of earth dams by the method of secant piles are reported. Areas for further study aimed at improving the quality of construction, increasing operational safety, and developing a standards base for the design, construction, and operation of these systems are discussed.

  13. Multiloop Integral System Test (MIST): MIST Facility Functional Specification

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Habib, T F; Koksal, C G; Moskal, T E

    1991-04-01

    The Multiloop Integral System Test (MIST) is part of a multiphase program started in 1983 to address small-break loss-of-coolant accidents (SBLOCAs) specific to Babcock and Wilcox designed plants. MIST is sponsored by the US Nuclear Regulatory Commission, the Babcock Wilcox Owners Group, the Electric Power Research Institute, and Babcock and Wilcox. The unique features of the Babcock and Wilcox design, specifically the hot leg U-bends and steam generators, prevented the use of existing integral system data or existing integral facilities to address the thermal-hydraulic SBLOCA questions. MIST was specifically designed and constructed for this program, and an existing facility --more » the Once Through Integral System (OTIS) -- was also used. Data from MIST and OTIS are used to benchmark the adequacy of system codes, such as RELAP5 and TRAC, for predicting abnormal plant transients. The MIST Functional Specification documents as-built design features, dimensions, instrumentation, and test approach. It also presents the scaling basis for the facility and serves to define the scope of work for the facility design and construction. 13 refs., 112 figs., 38 tabs.« less

  14. DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    Frost-protected shallow foundations (FPSFs) offer a proven technology designed to substantially lower construction costs in colder climates, enhancing housing affordability for families in many parts of the United States. This document provides step-by-step procedures to assist building professionals in designing and laying a slab- on-grade FPSF. FPSFs save money over conventional designs by requiring less excavation to construct a frost-proof foundation. It is specially insulated along its perimeter to raise the temperature of the surrounding ground and decrease frost penetration, thus allowing for the construction of a substantially shallower foundation. The FPSF is considered standard practice for homes in Scandinavia,more » where 40 years of field testing has proven it to be economical to construct, durable, and energy efficient. HUD strongly encourages wide spread adoption of FPSF technology in the United States and its incorporation into major model building codes.« less

  15. Tensile and compressive modulus of elasticity of pultruded fiber-reinforced polymer composite materials

    NASA Astrophysics Data System (ADS)

    Lee, J. H.; Kim, S. H.; Park, J. K.; Choi, W. C.; Yoon, S. J.

    2018-06-01

    Many researches focused on the mechanical properties of steel and concrete have been carried out for applications in the construction industry. However, in order to clarify the mechanical properties of pultruded fiber-reinforced polymer (PFRP) structural members for construction, testing is needed. Deriving the mechanical properties of PFRP structural members through testing is difficult, however, because some members cannot be tested easily due to their cross-section dimensions. This paper reports a part of studies that attempt to present conservative results in the case of members that cannot be tested reasonably. The authors obtained and compared experimental and theoretical modulus of elasticity values. If the mechanical properties of PFRP members can be predicted using reasonable and conservative values, then the structure can be designed economically and safely even in the early design stages. To this end, this paper proposes a strain energy approach as a conservative and convenient way to predict the mechanical properties of PFRP structural members. The strain energy data obtained can be used to predict the mechanical properties of PFRP members in the construction field.

  16. Low Velocity Airdrop Tests of an X-38 Backup Parachute Design

    NASA Technical Reports Server (NTRS)

    Stein, Jenny M.; Machin, Ricardo A.; Wolf, Dean F.; Hillebrandt, F. David

    2007-01-01

    The NASA Johnson Space Center's X-38 program designed a new backup parachute system to recover the 25,000 lb X-38 prototype for the Crew Return Vehicle spacecraft. Due to weight and cost constraints, the main backup parachute design incorporated rapid and low cost fabrication techniques using off-the-shelf materials. Near the vent, the canopy was constructed of continuous ribbons, to provide more damage tolerance. The remainder of the canopy was a constructed with a continuous ringslot design. After cancellation of the X-38 program, the parachute design was resized, built, and drop tested for Natick Soldiers Center's Low Velocity Air Drop (LVAD) program to deliver cargo loads up to 22,000 lbs from altitudes as low as 500 feet above the ground. Drop tests results showed that the 500-foot LVAD parachute deployment conditions cause severe skirt inversion and inflation problems for large parachutes. The bag strip occurred at a high angle of attack, causing skirt inversion before the parachute could inflate. The addition of a short reefing line prevented the skirt inversion. Using a lower porosity in the vent area, than is normally used in large parachutes, improved inflation. The drop testing demonstrated that the parachute design could be refined to meet the requirements for the 500-foot LVAD mission.

  17. Execution of Multidisciplinary Design Optimization Approaches on Common Test Problems

    NASA Technical Reports Server (NTRS)

    Balling, R. J.; Wilkinson, C. A.

    1997-01-01

    A class of synthetic problems for testing multidisciplinary design optimization (MDO) approaches is presented. These test problems are easy to reproduce because all functions are given as closed-form mathematical expressions. They are constructed in such a way that the optimal value of all variables and the objective is unity. The test problems involve three disciplines and allow the user to specify the number of design variables, state variables, coupling functions, design constraints, controlling design constraints, and the strength of coupling. Several MDO approaches were executed on two sample synthetic test problems. These approaches included single-level optimization approaches, collaborative optimization approaches, and concurrent subspace optimization approaches. Execution results are presented, and the robustness and efficiency of these approaches an evaluated for these sample problems.

  18. DESIGNING AN OPPORTUNITY FUEL WITH BIOMASS AND TIRE-DERIVED FUEL FOR COFIRING AT WILLOW ISLAND GENERATING STATION AND COFIRING SAWDUST WITH COAL AT ALBRIGHT GENERATING STATION

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    K. Payette; D. Tillman

    During the period July 1, 2001--September 30, 2001, Allegheny Energy Supply Co., LLC (Allegheny) continued construction of the Willow Island cofiring project, completed the installation of the fuel storage facility, the fuel receiving facility, and the processing building. All mechanical equipment has been installed and electrical construction has proceeded. During this time period significant short term testing of the Albright Generating Station cofiring facility was completed, and the 100-hour test was planned for early October. The testing demonstrated that cofiring at the Albright Generating Station could contribute to a ''4P Strategy''--reduction of SO{sub 2}, NO{sub x}, mercury, and greenhouse gasmore » emissions. This report summarizes the activities associated with the Designer Opportunity Fuel program, and demonstrations at Willow Island and Albright Generating Stations. It details the construction activities at both sites along with the combustion modeling at the Willow Island site.« less

  19. Cold-Flow Testing of a Proposed Integrated Center-Body Diffuser/Steam Blocker Concept for Plum Brook Station's B-2 Test Facility

    NASA Technical Reports Server (NTRS)

    Edwards, Daryl A.; Weaver, Harold F; Kastner, Carl E., Jr.

    2009-01-01

    The center-body diffuser (CBD) steam blocker (SB) system is a concept that incorporates a set of secondary drive nozzles into the envelope of a CBD, such that both nozzle systems (i.e., the rocket engine and the steam blocking nozzles) utilize the same supersonic diffuser, and will operate either singularly or concurrently. In this manner, the SB performs as an exhaust system stage when the rocket engine is not operating, and virtually eliminates discharge flow on rocket engine shutdown. A 2.25-percent scale model of a proposed SB integrated into a diffuser for the Plum Brook B-2 facility was constructed and cold-flow tested for the purpose of evaluating performance characteristics of various design options. These specific design options addressed secondary drive nozzle design (method of steam injection), secondary drive nozzle location relative to CBD throat, and center-body throat length to diameter (L/D) ratios. The objective of the test program is to identify the desired configuration to carry forward should the next phase of design proceed. The tested scale model can provide data for various pressure ratios; however, its design is based on a proposed B-2 spray chamber (SC) operating pressure of 4.0 psia and a steam supply pressure of 165 psia. Evaluation of the test data acquired during these tests indicate that either the discrete axial or annular nozzle configuration integrated into a CBD, with an annular throat length of 1.5 L/D at the nominal injection position, would be suitable to carry forward from the SB's perspective. Selection between these two then becomes more a function of constructability and implementation than performance. L/D also has some flexibility, and final L/D selection can be a function of constructability issues within a limited range.

  20. Soil-cement study : final report.

    DOT National Transportation Integrated Search

    1973-11-01

    This study consisted of an examination of the compressive strengths of soil-cement mixtures on 15 construction projects from the standpoint of design and actual achievement. The laboratory design test was examined closely along with the present field...

  1. 46 CFR 162.060-10 - Approval procedures.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ..., inspection, or testing required by this subpart must be duly noted in the Experimental Design section of the...) It meets the design and construction requirements in § 162.060-20 of this subpart; (2) It is...

  2. Continuation of down-hole geophysical testing for rock sockets.

    DOT National Transportation Integrated Search

    2013-11-01

    Site characterization for the design of deep foundations is crucial for ensuring a reliable and economic substructure design, as unanticipated site conditions can cause significant problems and disputes during construction. Traditional invasive explo...

  3. Around Marshall

    NASA Image and Video Library

    1962-03-31

    At its founding, the Marshall Space Flight Center (MSFC) inherited the Army’s Jupiter and Redstone test stands, but much larger facilities were needed for the giant stages of the Saturn V. From 1960 to 1964, the existing stands were remodeled and a sizable new test area was developed. The new comprehensive test complex for propulsion and structural dynamics was unique within the nation and the free world, and they remain so today because they were constructed with foresight to meet the future as well as on going needs. Construction of the S-IC Static test stand complex began in 1961 in the west test area of MSFC, and was completed in 1964. The S-IC static test stand was designed to develop and test the 138-ft long and 33-ft diameter Saturn V S-IC first stage, or booster stage, weighing in at 280,000 pounds. Required to hold down the brute force of a 7,500,000-pound thrust produced by 5 F-1 engines, the S-IC static test stand was designed and constructed with the strength of hundreds of tons of steel and 12,000,000 pounds of cement, planted down to bedrock 40 feet below ground level. The foundation walls, constructed with concrete and steel, are 4 feet thick. The base structure consists of four towers with 40-foot-thick walls extending upward 144 feet above ground level. The structure was topped by a crane with a 135-foot boom. With the boom in the upright position, the stand was given an overall height of 405 feet, placing it among the highest structures in Alabama at the time. In addition to the stand itself, related facilities were constructed during this time. Built directly east of the test stand was the Block House, which served as the control center for the test stand. The two were connected by a narrow tunnel which housed the cables for the controls. Again to the east, just south of the Block House, was a newly constructed Pump House. Its function was to provide water to the stand to prevent melting damage during testing. The water was sprayed through small holes in the stand’s 1900 ton water deflector at the rate of 320,000 gallons per minute. In this photo, taken March 20, 1962, construction of the Pump House area is well underway.

  4. A gas flow indicator for portable life support systems

    NASA Technical Reports Server (NTRS)

    Bass, R. L., III; Schroeder, E. C.

    1975-01-01

    A three-part program was conducted to develop a gas flow indicator (GFI) to monitor ventilation flow in a portable life support system. The first program phase identified concepts which could potentially meet the GFI requirements. In the second phase, a working breadboard GFI, based on the concept of a pressure sensing diaphragm-aneroid assembly connected to a venturi, was constructed and tested. Extensive testing of the breadboard GFI indicated that the design would meet all NASA requirements including eliminating problems experienced with the ventilation flow sensor used in the Apollo program. In the third program phase, an optimized GFI was designed by utilizing test data obtained on the breadboard unit. A prototype unit was constructed using prototype materials and fabrication techniques, and performance tests indicated that the prototype GFI met or exceeded all requirements.

  5. Stand for testing the electrical race car engine

    NASA Astrophysics Data System (ADS)

    Baier, M.; Franiasz, J.; Mierzwa, P.; Wylenzek, D.

    2015-11-01

    An engine test stand created especially for research of electrical race car is described in the paper. The car is an aim of Silesian Greenpower project whose participants build and test electrical vehicles to take part in international races in Great Britain. The engine test stand is used to test and measure the characteristics of vehicles and their engines. It has been designed particularly to test the electric cars engineered by students of Silesian Greenpower project. The article contains a description how the test stand works and shows its versatility in many areas. The paper presents both construction of the test stand, control system and sample results of conducted research. The engine test stand was designed and modified using PLM Siemens NX 8.5. The construction of the test stand is highly modular, which means it can be used both for testing the vehicle itself or for tests without the vehicle. The test stand has its own wheel, motor, powertrain and braking system with second engine. Such solution enables verifying various concepts without changing the construction of the vehicle. The control system and measurement system are realized by enabling National Instruments product myRIO (RIO - Reconfigurable Input/Output). This controller in combination with powerful LabVIEW environment performs as an advanced tool to control torque and speed simultaneously. It is crucial as far as the test stand is equipped in two motors - the one being tested and the braking one. The feedback loop is realized by an optical encoder cooperating with the rotor mounted on the wheel. The results of tests are shown live on the screen both as a chart and as single values. After performing several tests there is a report generated. The engine test stand is widely used during process of the Silesian Greenpower vehicle design. Its versatility enables powertrain testing, wheels and tires tests, thermal analysis and more.

  6. Around Marshall

    NASA Image and Video Library

    1962-10-08

    At its founding, the Marshall Space Flight Center (MSFC) inherited the Army’s Jupiter and Redstone test stands, but much larger facilities were needed for the giant stages of the Saturn V. From 1960 to 1964, the existing stands were remodeled and a sizable new test area was developed. The new comprehensive test complex for propulsion and structural dynamics was unique within the nation and the free world, and they remain so today because they were constructed with foresight to meet the future as well as on going needs. Construction of the S-IC Static test stand complex began in 1961 in the west test area of MSFC, and was completed in 1964. The S-IC static test stand was designed to develop and test the 138-ft long and 33-ft diameter Saturn V S-IC first stage, or booster stage, weighing in at 280,000 pounds. Required to hold down the brute force of a 7,500,000-pound thrust produced by 5 F-1 engines, the S-IC static test stand was designed and constructed with the strength of hundreds of tons of steel and 12,000,000 pounds of cement, planted down to bedrock 40 feet below ground level. The foundation walls, constructed with concrete and steel, are 4 feet thick. The base structure consists of four towers with 40-foot-thick walls extending upward 144 feet above ground level. The structure was topped by a crane with a 135-foot boom. With the boom in the upright position, the stand was given an overall height of 405 feet, placing it among the highest structures in Alabama at the time. Built directly east of the test stand was the Block House, which served as the control center for the test stand. The two were connected by a narrow access tunnel which housed the cables for the controls. This construction photo, taken October 8, 1962, depicts a front view of the Block House nearing completion.

  7. Around Marshall

    NASA Image and Video Library

    1962-01-23

    At its founding, the Marshall Space Flight Center (MSFC) inherited the Army’s Jupiter and Redstone test stands, but much larger facilities were needed for the giant stages of the Saturn V. From 1960 to 1964, the existing stands were remodeled and a sizable new test area was developed. The new comprehensive test complex for propulsion and structural dynamics was unique within the nation and the free world, and they remain so today because they were constructed with foresight to meet the future as well as on going needs. Construction of the S-IC Static test stand complex began in 1961 in the west test area of MSFC, and was completed in 1964. The S-IC static test stand was designed to develop and test the 138-ft long and 33-ft diameter Saturn V S-IC first stage, or booster stage, weighing in at 280,000 pounds. Required to hold down the brute force of a 7,500,000-pound thrust produced by 5 F-1 engines, the S-IC static test stand was designed and constructed with the strength of hundreds of tons of steel and 12,000,000 pounds of cement, planted down to bedrock 40 feet below ground level. The foundation walls, constructed with concrete and steel, are 4 feet thick. The base structure consists of four towers with 40-foot-thick walls extending upward 144 feet above ground level. The structure was topped by a crane with a 135-foot boom. With the boom in the upright position, the stand was given an overall height of 405 feet, placing it among the highest structures in Alabama at the time. In addition to the stand itself, related facilities were constructed during this time. Built directly east of the test stand was the Block House, which served as the control center for the test stand. The two were connected by a narrow access tunnel which housed the cables for the controls. This photo, taken January 23, 1962, shows the excavation of the Block House site.

  8. Around Marshall

    NASA Image and Video Library

    1962-02-02

    At its founding, the Marshall Space Flight Center (MSFC) inherited the Army’s Jupiter and Redstone test stands, but much larger facilities were needed for the giant stages of the Saturn V. From 1960 to 1964, the existing stands were remodeled and a sizable new test area was developed. The new comprehensive test complex for propulsion and structural dynamics was unique within the nation and the free world, and they remain so today because they were constructed with foresight to meet the future as well as on going needs. Construction of the S-IC Static test stand complex began in 1961 in the west test area of MSFC, and was completed in 1964. The S-IC static test stand was designed to develop and test the 138-ft long and 33-ft diameter Saturn V S-IC first stage, or booster stage, weighing in at 280,000 pounds. Required to hold down the brute force of a 7,500,000-pound thrust produced by 5 F-1 engines, the S-IC static test stand was designed and constructed with the strength of hundreds of tons of steel and 12,000,000 pounds of cement, planted down to bedrock 40 feet below ground level. The foundation walls, constructed with concrete and steel, are 4 feet thick. The base structure consists of four towers with 40-foot-thick walls extending upward 144 feet above ground level. The structure was topped by a crane with a 135-foot boom. With the boom in the upright position, the stand was given an overall height of 405 feet, placing it among the highest structures in Alabama at the time. In addition to the stand itself, related facilities were constructed during this time. Built directly east of the test stand was the Block House, which served as the control center for the test stand. The two were connected by a narrow access tunnel which housed the cables for the controls. This photo, taken February 2, 1962, shows the excavation of the Block House site.

  9. An Advanced ESTCP PELAN System for Surface and Near-surface UXO Discrimination

    DTIC Science & Technology

    2009-03-01

    system was designed and assembled at SAIC. Test slugs representing 30mm to 105mm shells were constructed and filled with inert materials and explosives...results and system design, ESTCP decided to discontinue the effort before the prototype was constructed and demonstrated. iii TABLE OF CONTENTS...RDX and non-explosive plasticizers ) cps counts per second CW Chemical Warfare agent d-T deuterium-tritium DoD Department of Defense DOE

  10. Evidence of Construct Validity in Published Achievement Tests.

    ERIC Educational Resources Information Center

    Nolet, Victor; Tindal, Gerald

    Valid interpretation of test scores is the shared responsibility of the test designer and the test user. Test publishers must provide evidence of the validity of the decisions their tests are intended to support, while test users are responsible for analyzing this evidence and subsequently using the test in the manner indicated by the publisher.…

  11. Advanced Extended Plate and Beam Wall System in a Cold-Climate House

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Mallay, Dave; Wiehagen, Joseph; Kochkin, Vladimir

    This report presents the design and evaluation of an innovative wall system. This highly insulated (high-R) light-frame wall system for use above grade in residential buildings is referred to as Extended Plate & Beam (EP&B). The EP&B design is the first of its kind to be featured in a new construction test house (NCTH) for the DOE Building America program. The EP&B wall design integrates standard building methods and common building products to construct a high-R wall that minimizes transition risks and costs to builders.

  12. 23 CFR 172.3 - Definitions.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ..., design, engineering, surveying, mapping, or architectural related services with respect to a construction... DESIGN RELATED SERVICE CONTRACTS § 172.3 Definitions. As used in this part: Audit means a review to test... individual or firm providing engineering and design related services as a party to the contract. Contracting...

  13. 23 CFR 172.3 - Definitions.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ..., design, engineering, surveying, mapping, or architectural related services with respect to a construction... DESIGN RELATED SERVICE CONTRACTS § 172.3 Definitions. As used in this part: Audit means a review to test... individual or firm providing engineering and design related services as a party to the contract. Contracting...

  14. 23 CFR 172.3 - Definitions.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ..., design, engineering, surveying, mapping, or architectural related services with respect to a construction... DESIGN RELATED SERVICE CONTRACTS § 172.3 Definitions. As used in this part: Audit means a review to test... individual or firm providing engineering and design related services as a party to the contract. Contracting...

  15. 23 CFR 172.3 - Definitions.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ..., design, engineering, surveying, mapping, or architectural related services with respect to a construction... DESIGN RELATED SERVICE CONTRACTS § 172.3 Definitions. As used in this part: Audit means a review to test... individual or firm providing engineering and design related services as a party to the contract. Contracting...

  16. 23 CFR 172.3 - Definitions.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ..., design, engineering, surveying, mapping, or architectural related services with respect to a construction... DESIGN RELATED SERVICE CONTRACTS § 172.3 Definitions. As used in this part: Audit means a review to test... individual or firm providing engineering and design related services as a party to the contract. Contracting...

  17. TEST RESULTS FOR FUEL-CELL OPERATION ON LANDFILL GAS

    EPA Science Inventory

    Test results from a demonstration of fuel-cell (FC) energy recovery and control of landfill gas emissions are presented. The project addressed two major issues: (i) the design, construction, and testing of a landfill-gas cleanup system; and (ii) a field test of a commercial phos...

  18. 33 CFR 159.107 - Rolling test.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 33 Navigation and Navigable Waters 2 2011-07-01 2011-07-01 false Rolling test. 159.107 Section 159.107 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) POLLUTION MARINE SANITATION DEVICES Design, Construction, and Testing § 159.107 Rolling test. (a) The device, with...

  19. 33 CFR 159.105 - Shock test.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 33 Navigation and Navigable Waters 2 2011-07-01 2011-07-01 false Shock test. 159.105 Section 159.105 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) POLLUTION MARINE SANITATION DEVICES Design, Construction, and Testing § 159.105 Shock test. The device, with liquid...

  20. 33 CFR 159.111 - Pressure and vacuum pulse test.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 33 Navigation and Navigable Waters 2 2010-07-01 2010-07-01 false Pressure and vacuum pulse test... (CONTINUED) POLLUTION MARINE SANITATION DEVICES Design, Construction, and Testing § 159.111 Pressure and vacuum pulse test. Liquid retention components of the device with manufacturer specified venting...

  1. 33 CFR 159.111 - Pressure and vacuum pulse test.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 33 Navigation and Navigable Waters 2 2012-07-01 2012-07-01 false Pressure and vacuum pulse test... (CONTINUED) POLLUTION MARINE SANITATION DEVICES Design, Construction, and Testing § 159.111 Pressure and vacuum pulse test. Liquid retention components of the device with manufacturer specified venting...

  2. 33 CFR 159.111 - Pressure and vacuum pulse test.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 33 Navigation and Navigable Waters 2 2014-07-01 2014-07-01 false Pressure and vacuum pulse test... (CONTINUED) POLLUTION MARINE SANITATION DEVICES Design, Construction, and Testing § 159.111 Pressure and vacuum pulse test. Liquid retention components of the device with manufacturer specified venting...

  3. 33 CFR 159.115 - Temperature range test.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 33 Navigation and Navigable Waters 2 2011-07-01 2011-07-01 false Temperature range test. 159.115 Section 159.115 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) POLLUTION MARINE SANITATION DEVICES Design, Construction, and Testing § 159.115 Temperature range test. (a...

  4. 33 CFR 159.121 - Sewage processing test.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 33 Navigation and Navigable Waters 2 2011-07-01 2011-07-01 false Sewage processing test. 159.121 Section 159.121 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) POLLUTION MARINE SANITATION DEVICES Design, Construction, and Testing § 159.121 Sewage processing test. (a...

  5. EXPERIMENTAL DEVELOPMENT OF VARIABILITY IN READING RATE IN GRADES FOUR, FIVE AND SIX.

    ERIC Educational Resources Information Center

    HARRIS, THEODORE L.; AND OTHERS

    METHODS OF TESTING, EVALUATING, AND TEACHING READING IN THE FOURTH, FIFTH AND SIXTH GRADES ARE DESCRIBED. CONSTRUCTION AND DESIGN OF EXPERIMENTAL TESTS OF VARIABILITY IN READING SPEED ARE DISCUSSED. DESIGN WAS BASED ON THE RATIONALE THAT A MEANINGFUL READING-TIME SCORE DIRECTLY RELATED TO THE SUBJECT'S PURPOSE FOR READING. WHILE READING SPEED MAY…

  6. The Testing Behind The Test Facility: The Acoustic Design of the NASA Glenn Research Center's World-Class Reverberant Acoustic Test Facility

    NASA Technical Reports Server (NTRS)

    Hozman, Aron D.; Hughes, William O.; McNelis, Mark E.; McNelis, Anne M.

    2011-01-01

    The National Aeronautics and Space Administration (NASA) Glenn Research Center (GRC) is leading the design and build of the new world-class vibroacoustic test capabilities at the NASA GRC's Plum Brook Station in Sandusky, Ohio, USA. Benham Companies, LLC is currently constructing modal, base-shake sine and reverberant acoustic test facilities to support the future testing needs of NASA's space exploration program. The large Reverberant Acoustic Test Facility (RATF) will be approximately 101,000 cu ft in volume and capable of achieving an empty chamber acoustic overall sound pressure level (OASPL) of 163 dB. This combination of size and acoustic power is unprecedented amongst the world's known active reverberant acoustic test facilities. The key to achieving the expected acoustic test spectra for a range of many NASA space flight environments in the RATF is the knowledge gained from a series of ground acoustic tests. Data was obtained from several NASA-sponsored test programs, including testing performed at the National Research Council of Canada's acoustic test facility in Ottawa, Ontario, Canada, and at the Redstone Technical Test Center acoustic test facility in Huntsville, Alabama, USA. The majority of these tests were performed to characterize the acoustic performance of the modulators (noise generators) and representative horns that would be required to meet the desired spectra, as well as to evaluate possible supplemental gas jet noise sources. The knowledge obtained in each of these test programs enabled the design of the RATF sound generation system to confidently advance to its final acoustic design and subsequent on-going construction.

  7. Around Marshall

    NASA Image and Video Library

    1962-07-03

    At its founding, the Marshall Space Flight Center (MSFC) inherited the Army’s Jupiter and Redstone test stands, but much larger facilities were needed for the giant stages of the Saturn V. From 1960 to 1964, the existing stands were remodeled and a sizable new test area was developed. The new comprehensive test complex for propulsion and structural dynamics was unique within the nation and the free world, and they remain so today because they were constructed with foresight to meet the future as well as on going needs. Construction of the S-IC Static test stand complex began in 1961 in the west test area of MSFC, and was completed in 1964. The S-IC static test stand was designed to develop and test the 138-ft long and 33-ft diameter Saturn V S-IC first stage, or booster stage, weighing in at 280,000 pounds. Required to hold down the brute force of a 7,500,000-pound thrust produced by 5 F-1 engines, the S-IC static test stand was designed and constructed with the strength of hundreds of tons of steel and 12,000,000 pounds of cement, planted down to bedrock 40 feet below ground level. The foundation walls, constructed with concrete and steel, are 4 feet thick. The base structure consists of four towers with 40-foot-thick walls extending upward 144 feet above ground level. The structure was topped by a crane with a 135-foot boom. With the boom in the upright position, the stand was given an overall height of 405 feet, placing it among the highest structures in Alabama at the time. In addition to the stand itself, related facilities were constructed during this time. Built directly east of the test stand was the Block House, which served as the control center for the test stand. The two were connected by a narrow access tunnel which housed the cables for the controls. This construction photo taken July 3, 1962 depicts the Block House with a portion of its concrete walls poured and exposed while many are still in the forms stage.

  8. Price vs. Performance: The Value of Next Generation Fighter Aircraft

    DTIC Science & Technology

    2007-03-01

    forms. Both the semi-log and log-log forms were plagued with heteroskedasticity (according to the Breusch - Pagan /Cook-Weisberg test ). The RDT&E models...from 1949-present were used to construct two models – one based on procurement costs and one based on research, design, test , and evaluation (RDT&E...fighter aircraft hedonic models include several different categories of variables. Aircraft procurement costs and research, design, test , and

  9. Design, construction, operation, and evaluation of a prototype culm combustion boiler/heater unit

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    D'Aciermo, J.; Richards, H.; Spindler, F.

    1983-10-01

    A process for utilizing anthracite culm in a fluidized bed combustion system was demonstrated by the design and construction of a prototype steam plant at Shamokin, PA, and operation of the plant for parametric tests and a nine month extended durability test. The parametric tests evaluated turndown capability of the plant and established turndown techniques to be used to achieve best performance. Throughout the test program the fluidized bed boiler durability was excellent, showing very high resistence to corrosion and erosion. A series of 39 parametric tests was performed in order to demonstrate turndown capabilities of the atmospheric fluidized bedmore » boiler burning anthracite culm. Four tests were performed with bituminous coal waste (called gob) which contains 4.8 to 5.5% sulfur. Heating value of both fuels is approximately 3000 Btu/lb and ash content is approximately 70%. Combustion efficiency, boiler efficiency, and emissions of NO/sub x/ and SO/sub 2/ were also determined for the tests.« less

  10. Lessons Learned about Liquid Metal Reactors from FFTF Experience

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Wootan, David W.; Casella, Andrew M.; Omberg, Ronald P.

    2016-09-20

    The Fast Flux Test Facility (FFTF) is the most recent liquid-metal reactor (LMR) to operate in the United States, from 1982 to 1992. FFTF is located on the DOE Hanford Site near Richland, Washington. The 400-MWt sodium-cooled, low-pressure, high-temperature, fast-neutron flux, nuclear fission test reactor was designed specifically to irradiate Liquid Metal Fast Breeder Reactor (LMFBR) fuel and components in prototypical temperature and flux conditions. FFTF played a key role in LMFBR development and testing activities. The reactor provided extensive capability for in-core irradiation testing, including eight core positions that could be used with independent instrumentation for the test specimens.more » In addition to irradiation testing capabilities, FFTF provided long-term testing and evaluation of plant components and systems for LMFBRs. The FFTF was highly successful and demonstrated outstanding performance during its nearly 10 years of operation. The technology employed in designing and constructing this reactor, as well as information obtained from tests conducted during its operation, can significantly influence the development of new advanced reactor designs in the areas of plant system and component design, component fabrication, fuel design and performance, prototype testing, site construction, and reactor operations. The FFTF complex included the reactor, as well as equipment and structures for heat removal, containment, core component handling and examination, instrumentation and control, and for supplying utilities and other essential services. The FFTF Plant was designed using a “system” concept. All drawings, specifications and other engineering documentation were organized by these systems. Efforts have been made to preserve important lessons learned during the nearly 10 years of reactor operation. A brief summary of Lessons Learned in the following areas will be discussed: Acceptance and Startup Testing of FFTF FFTF Cycle Reports« less

  11. Design and construction of a tensile tester for the testing of simple composites

    NASA Technical Reports Server (NTRS)

    Borst, Mark A.; Spiegel, F. Xavier

    1994-01-01

    The following is a design for a tensile tester which will be used to test the tensile strength and anisotropic properties of simple composites. These simple composites are suspected to be anisotropic primarily in a single plane. When the composites undergo a tensile force, they will undergo deformation, causing movement either to the left or right. The composites are suspect due to their method of construction. Each sample has a single layer of unidirectional continuous fibers embedded in a rubbery resin. It has been well established that a serious limitation of unidirectional fiber composites is the very large in-plane anisotropy. The design presented here incorporates a single degree of freedom such that distortion (to the left or right) due to anisotropic tendencies may be measured. The device will spend the vast majority of its time in an undergraduate materials lab. As a result, ease of use and durability are valued more highly than research grade accuracy. Additional concerns focus on the fact that this machine will be built as a student project. Issues which are dealt with during this design include: specimen configuration or shape; a method of applying consistent, linear tension force; a method of gripping specimen without affecting its overall properties; a method of collecting data; repeatability of data; ease of use; ease of construction; and cost. After the device has been constructed, it will be used to test the simple composites which were fabricated in house. A comparison will be made between composites manufactured using aluminum screening as the strengthening fibers and those manufactured using fiberglass screening.

  12. Design, Fabrication, and Performance of Foil Gas Thrust Bearings for Microturbomachinery Applications

    NASA Technical Reports Server (NTRS)

    Dykas, Brian; Bruckner, Robert; DellaCorte, Christopher; Edmonds, Brian; Prahl, Joseph

    2008-01-01

    A methodology for the design and construction of simple foil thrust bearings intended for parametric performance testing and low marginal costs is presented. Features drawn from a review of the open literature are discussed as they relate to bearing performance. The design of fixtures and tooling required to fabricate foil thrust bearings is presented, using conventional machining processes where possible. A prototype bearing with dimensions drawn from the literature is constructed, with all fabrication steps described. A load-deflection curve for the bearing is presented to illustrate structural stiffness characteristics. Start-top cycles are performed on the bearing at a temperature of 425 C to demonstrate early-life wear patterns. A test of bearing load capacity demonstrates useful performance when compared with data obtained from the open literature.

  13. Static Frequency Converter System Installed and Tested

    NASA Technical Reports Server (NTRS)

    Brown, Donald P.; Sadhukhan, Debashis

    2003-01-01

    A new Static Frequency Converter (SFC) system has been installed and tested at the NASA Glenn Research Center s Central Air Equipment Building to provide consistent, reduced motor start times and improved reliability for the building s 14 large exhausters and compressors. The operational start times have been consistent around 2 min, 20 s per machine. This is at least a 3-min improvement (per machine) over the old variable-frequency motor generator sets. The SFC was designed and built by Asea Brown Boveri (ABB) and installed by Encompass Design Group (EDG) as part of a Construction of Facilities project managed by Glenn (Robert Scheidegger, project manager). The authors designed the Central Process Distributed Control Systems interface and control between the programmable logic controller, solid-state exciter, and switchgear, which was constructed by Gilcrest Electric.

  14. Acceptance Test Procedure for New Pumping Instrumentation and Control Skid Q

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    KOCH, M.R.

    2000-03-27

    This Acceptance Test Procedure (ATP) provides for the inspection and testing of the new Pumping Instrumentation and Control (PIC) skid designed as ''Q''. The ATP will be performed after the construction of the PIC skid in the fabrication shop.

  15. The Impact of Environmental Design on Doffing Personal Protective Equipment in a Healthcare Environment: A Formative Human Factors Trial.

    PubMed

    Herlihey, Tracey A; Gelmi, Stefano; Cafazzo, Joseph A; Hall, Trevor N T

    2017-06-01

    OBJECTIVE To explore the impact of environmental design on doffing personal protective equipment in a simulated healthcare environment. METHODS A mixed-methods approach was used that included human-factors usability testing and qualitative questionnaire responses. A patient room and connecting anteroom were constructed for testing purposes. This experimental doffing area was designed to overcome the environmental failures identified in a previous study and was not constructed based on any generalizable hospital standard. RESULTS In total, 72 healthcare workers from Ontario, Canada, took part in the study and tested the simulated doffing area. The following environmental design changes were tested and were deemed effective: increasing prominence of color-coded zones; securing disinfectant wipes and hand sanitizer; outlining disposal bins locations; providing mirrors to detect possible contamination; providing hand rails to assist with doffing; and restricting the space to doff. Further experimentation and iterative design are required with regard to several important features: positioning the disposal bins for safety, decreasing the risk of contamination and user accessibility; optimal positioning of mirrors for safety; communication within the team; and positioning the secondary team member for optimal awareness. Additional design suggestions also emerged during this study, and they require future investigation. CONCLUSIONS This study highlights the importance of the environment on doffing personal protective equipment in a healthcare setting. Iterative testing and modification of the design of the environment (doffing area) are important to enhancing healthcare worker safety. Infect Control Hosp Epidemiol 2017;38:712-717.

  16. Space Shuttle inflatable training articles

    NASA Technical Reports Server (NTRS)

    West, M. L.

    1984-01-01

    The design, development, construction, and testing of the Long Duration Exposure Facility inflatable and the space telescope training articles are discussed. While these articles are of similar nature, materials, and construction, they vary in size and present different problems with regards to size, shape, gross/net lift, and balance.

  17. 33 CFR 148.5 - How are terms used in this subchapter defined?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... and calculations for construction of deepwater ports, conducting inspections, witnessing tests, and..., or naturalization; (2) Any State, State agency, or group of States; or (3) Any corporation... cofferdam or double bottom tank; or (2) Is not designed for continuous occupancy by personnel. Construction...

  18. Mars oxygen production system design

    NASA Technical Reports Server (NTRS)

    Cotton, Charles E.; Pillow, Linda K.; Perkinson, Robert C.; Brownlie, R. P.; Chwalowski, P.; Carmona, M. F.; Coopersmith, J. P.; Goff, J. C.; Harvey, L. L.; Kovacs, L. A.

    1989-01-01

    The design and construction phase is summarized of the Mars oxygen demonstration project. The basic hardware required to produce oxygen from simulated Mars atmosphere was assembled and tested. Some design problems still remain with the sample collection and storage system. In addition, design and development of computer compatible data acquisition and control instrumentation is ongoing.

  19. Mars oxygen production system design

    NASA Technical Reports Server (NTRS)

    1988-01-01

    This report summarizes the design and construction of the Mars oxygen demonstration project. The basic hardware required to produce oxygen from simulated Mars atmosphere has been assembled and tested. Some design problems still remain with the sample collection and storage system. In addition, design and development of computer data acquisition and control instrumentation is continuing.

  20. CRISPR EnAbled trackable genome engineering for isopropanol production in Escherichia coli

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Liang, Liya; Liu, Rongming; Garst, Andrew D.

    Isopropanol is an important target molecule for sustainable production of fuels and chemicals. Increases in DNA synthesis and synthetic biology capabilities have resulted in the development of a range of new strategies for the more rapid design, construction, and testing of production strains. Here, we report on the use of such capabilities to construct and test 903 different variants of the isopropanol production pathway in Escherichia coli. We first constructed variants to explore the effect of codon optimization, copy number, and translation initiation rates on isopropanol production. The best strain (PA06) produced isopropanol at titers of 17.5 g/L, with amore » yield of 0.62 (mol/mol), and maximum productivity of 0.40 g/L/h. We next integrated the isopropanol synthetic pathway into the genome and then used the CRISPR EnAbled Trackable genome Engineering (CREATE) strategy to generate an additional 640 individual RBS library variants for further evaluation. After testing each of these variants, we constructed a combinatorial library containing 256 total variants from four different RBS levels for each gene. The best producing variant, PA14, produced isopropanol at titers of 7.1 g/L at 24 h, with a yield of 0.75 (mol/mol), and maximum productivity of 0.62 g/L/h (which was 0.22 g/L/h above the parent strain PA07). As a result, we demonstrate the ability to rapidly construct and test close to ~1000 designer strains and identify superior performers.« less

  1. CRISPR EnAbled trackable genome engineering for isopropanol production in Escherichia coli

    DOE PAGES

    Liang, Liya; Liu, Rongming; Garst, Andrew D.; ...

    2017-02-16

    Isopropanol is an important target molecule for sustainable production of fuels and chemicals. Increases in DNA synthesis and synthetic biology capabilities have resulted in the development of a range of new strategies for the more rapid design, construction, and testing of production strains. Here, we report on the use of such capabilities to construct and test 903 different variants of the isopropanol production pathway in Escherichia coli. We first constructed variants to explore the effect of codon optimization, copy number, and translation initiation rates on isopropanol production. The best strain (PA06) produced isopropanol at titers of 17.5 g/L, with amore » yield of 0.62 (mol/mol), and maximum productivity of 0.40 g/L/h. We next integrated the isopropanol synthetic pathway into the genome and then used the CRISPR EnAbled Trackable genome Engineering (CREATE) strategy to generate an additional 640 individual RBS library variants for further evaluation. After testing each of these variants, we constructed a combinatorial library containing 256 total variants from four different RBS levels for each gene. The best producing variant, PA14, produced isopropanol at titers of 7.1 g/L at 24 h, with a yield of 0.75 (mol/mol), and maximum productivity of 0.62 g/L/h (which was 0.22 g/L/h above the parent strain PA07). As a result, we demonstrate the ability to rapidly construct and test close to ~1000 designer strains and identify superior performers.« less

  2. 46 CFR 162.060-10 - Approval procedures.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... required by this subpart must be duly noted in the Experimental Design section of the Test Plan. (c) The... design and construction requirements in § 162.060-20 of this subpart; (2) It is evaluated, inspected, and...

  3. 46 CFR 162.060-10 - Approval procedures.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... required by this subpart must be duly noted in the Experimental Design section of the Test Plan. (c) The... design and construction requirements in § 162.060-20 of this subpart; (2) It is evaluated, inspected, and...

  4. The Development of the Acoustic Design of NASA Glenn Research Center's New Reverberant Acoustic Test Facility

    NASA Technical Reports Server (NTRS)

    Hughes, William O.; McNelis, Mark E.; Hozman, Aron D.; McNelis, Anne M.

    2011-01-01

    The National Aeronautics and Space Administration (NASA) Glenn Research Center (GRC) is leading the design and build of the new world-class vibroacoustic test capabilities at the NASA GRC s Plum Brook Station in Sandusky, Ohio. Benham Companies, LLC is currently constructing modal, base-shake sine and reverberant acoustic test facilities to support the future testing needs of NASA s space exploration program. The large Reverberant Acoustic Test Facility (RATF) will be approximately 101,000 ft3 in volume and capable of achieving an empty chamber acoustic overall sound pressure level (OASPL) of 163 dB. This combination of size and acoustic power is unprecedented amongst the world s known active reverberant acoustic test facilities. The key to achieving the expected acoustic test spectra for a range of many NASA space flight environments in the RATF is the knowledge gained from a series of ground acoustic tests. Data was obtained from several NASA-sponsored test programs, including testing performed at the National Research Council of Canada s acoustic test facility in Ottawa, Ontario, Canada, and at the Redstone Technical Test Center acoustic test facility in Huntsville, Alabama. The majority of these tests were performed to characterize the acoustic performance of the modulators (noise generators) and representative horns that would be required to meet the desired spectra, as well as to evaluate possible supplemental gas jet noise sources. The knowledge obtained in each of these test programs enabled the design of the RATF sound generation system to confidently advance to its final acoustic design and subsequent on-going construction.

  5. The Development of the Acoustic Design of NASA Glenn Research Center's New Reverberant Acoustic Test Facility

    NASA Technical Reports Server (NTRS)

    Hughes, William O.; McNelis, Mark E.; Hozman, Aron D.; McNelis, Anne M.

    2011-01-01

    The National Aeronautics and Space Administration (NASA) Glenn Research Center (GRC) is leading the design and build of the new world-class vibroacoustic test capabilities at the NASA GRC's Plum Brook Station in Sandusky, Ohio, USA. Benham Companies, LLC is currently constructing modal, base-shake sine and reverberant acoustic test facilities to support the future testing needs of NASA s space exploration program. The large Reverberant Acoustic Test Facility (RATF) will be approximately 101,000 ft3 in volume and capable of achieving an empty chamber acoustic overall sound pressure level (OASPL) of 163 dB. This combination of size and acoustic power is unprecedented amongst the world s known active reverberant acoustic test facilities. The key to achieving the expected acoustic test spectra for a range of many NASA space flight environments in the RATF is the knowledge gained from a series of ground acoustic tests. Data was obtained from several NASA-sponsored test programs, including testing performed at the National Research Council of Canada s acoustic test facility in Ottawa, Ontario, Canada, and at the Redstone Technical Test Center acoustic test facility in Huntsville, Alabama, USA. The majority of these tests were performed to characterize the acoustic performance of the modulators (noise generators) and representative horns that would be required to meet the desired spectra, as well as to evaluate possible supplemental gas jet noise sources. The knowledge obtained in each of these test programs enabled the design of the RATF sound generation system to confidently advance to its final acoustic design and subsequent on-going construction.

  6. Around Marshall

    NASA Image and Video Library

    1963-01-14

    At its founding, the Marshall Space Flight Center (MSFC) inherited the Army’s Jupiter and Redstone test stands, but much larger facilities were needed for the giant stages of the Saturn V. From 1960 to 1964, the existing stands were remodeled and a sizable new test area was developed. The new comprehensive test complex for propulsion and structural dynamics was unique within the nation and the free world, and they remain so today because they were constructed with foresight to meet the future as well as on going needs. Construction of the S-IC Static test stand complex began in 1961 in the west test area of MSFC, and was completed in 1964. The S-IC static test stand was designed to develop and test the 138-ft long and 33-ft diameter Saturn V S-IC first stage, or booster stage, weighing in at 280,000 pounds. Required to hold down the brute force of a 7,500,000-pound thrust produced by 5 F-1 engines, the S-IC static test stand was designed and constructed with the strength of hundreds of tons of steel and 12,000,000 pounds of cement, planted down to bedrock 40 feet below ground level. The foundation walls, constructed with concrete and steel, are 4 feet thick. The base structure consists of four towers with 40-foot-thick walls extending upward 144 feet above ground level. The structure was topped by a crane with a 135-foot boom. With the boom in the upright position, the stand was given an overall height of 405 feet, placing it among the highest structures in Alabama at the time. In addition to the S-IC test stand, related facilities were constructed during this time frame. Built just north of the massive S-IC test stand was the F-1 Engine test stand. The F-1 test stand is a vertical engine firing test stand, 239 feet in elevation and 4,600 square feet in area at the base, and was designed to assist in the development of the F-1 Engine. Capability was provided for static firing of 1.5 million pounds of thrust using liquid oxygen and kerosene. Like the S-IC stand, the foundation of the F-1 stand is keyed into the bedrock approximately 40 feet below grade. This photo, taken January 14, 1963 depicts the F-1 test stand site with hoses pumping excess water from the site.

  7. Research notes : light tube leads the way.

    DOT National Transportation Integrated Search

    2000-09-01

    Recently, Oregon Department of Transportation (ODOT) tested a traffic control device designed to improve delineation of curves through highway construction projects. The 3M Lighted Guidance Tube (LGT) was tested on the Eddyville-Cline Hill Section...

  8. 24th geotechnical laboratory testing short course

    DOT National Transportation Integrated Search

    2008-02-01

    This is a 3-day workshop/short course to teach practicing professionals techniques and procedures for conducting high quality geotechnical laboratory tests. Transportation facility design and construction begins with an investigation of the type, ext...

  9. 33 CFR 159.117 - Chemical resistance test.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 33 Navigation and Navigable Waters 2 2010-07-01 2010-07-01 false Chemical resistance test. 159.117...) POLLUTION MARINE SANITATION DEVICES Design, Construction, and Testing § 159.117 Chemical resistance test. (a... disinfectant that is required in the operation of the device. (3) Any chemical compound in solid, liquid or...

  10. 33 CFR 159.117 - Chemical resistance test.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 33 Navigation and Navigable Waters 2 2011-07-01 2011-07-01 false Chemical resistance test. 159.117...) POLLUTION MARINE SANITATION DEVICES Design, Construction, and Testing § 159.117 Chemical resistance test. (a... disinfectant that is required in the operation of the device. (3) Any chemical compound in solid, liquid or...

  11. Technical memo, project 0-6132 : task 6 - test sections in the districts.

    DOT National Transportation Integrated Search

    2011-01-01

    This Tech Memo provides a summary of the Lab Test, Distress Survey, and Construction Reports : for the RAP Test Sections in Laredo District. Based on extensive lab testing by TTI, the District : elected to use the TTI mix-design (5.0% PG 64-22 + Crus...

  12. 33 CFR 159.109 - Pressure test.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... the tank, whichever is greater. The tank must hold the water at this pressure for 1 hour with no... 33 Navigation and Navigable Waters 2 2010-07-01 2010-07-01 false Pressure test. 159.109 Section...) POLLUTION MARINE SANITATION DEVICES Design, Construction, and Testing § 159.109 Pressure test. Any sewage...

  13. 33 CFR 159.117 - Chemical resistance test.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 33 Navigation and Navigable Waters 2 2014-07-01 2014-07-01 false Chemical resistance test. 159.117...) POLLUTION MARINE SANITATION DEVICES Design, Construction, and Testing § 159.117 Chemical resistance test. (a... disinfectant that is required in the operation of the device. (3) Any chemical compound in solid, liquid or...

  14. 33 CFR 159.117 - Chemical resistance test.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 33 Navigation and Navigable Waters 2 2012-07-01 2012-07-01 false Chemical resistance test. 159.117...) POLLUTION MARINE SANITATION DEVICES Design, Construction, and Testing § 159.117 Chemical resistance test. (a... disinfectant that is required in the operation of the device. (3) Any chemical compound in solid, liquid or...

  15. 33 CFR 159.117 - Chemical resistance test.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 33 Navigation and Navigable Waters 2 2013-07-01 2013-07-01 false Chemical resistance test. 159.117...) POLLUTION MARINE SANITATION DEVICES Design, Construction, and Testing § 159.117 Chemical resistance test. (a... disinfectant that is required in the operation of the device. (3) Any chemical compound in solid, liquid or...

  16. 14 CFR 25.683 - Operation tests.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 14 Aeronautics and Space 1 2013-01-01 2013-01-01 false Operation tests. 25.683 Section 25.683... STANDARDS: TRANSPORT CATEGORY AIRPLANES Design and Construction Control Systems § 25.683 Operation tests. It must be shown by operation tests that when portions of the control system subject to pilot effort loads...

  17. 14 CFR 29.683 - Operation tests.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 1 2010-01-01 2010-01-01 false Operation tests. 29.683 Section 29.683... STANDARDS: TRANSPORT CATEGORY ROTORCRAFT Design and Construction Control Systems § 29.683 Operation tests. It must be shown by operation tests that, when the controls are operated from the pilot compartment...

  18. 14 CFR 27.683 - Operation tests.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 14 Aeronautics and Space 1 2014-01-01 2014-01-01 false Operation tests. 27.683 Section 27.683... STANDARDS: NORMAL CATEGORY ROTORCRAFT Design and Construction Control Systems § 27.683 Operation tests. It must be shown by operation tests that, when the controls are operated from the pilot compartment with...

  19. 14 CFR 29.683 - Operation tests.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 14 Aeronautics and Space 1 2014-01-01 2014-01-01 false Operation tests. 29.683 Section 29.683... STANDARDS: TRANSPORT CATEGORY ROTORCRAFT Design and Construction Control Systems § 29.683 Operation tests. It must be shown by operation tests that, when the controls are operated from the pilot compartment...

  20. 14 CFR 27.683 - Operation tests.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 1 2010-01-01 2010-01-01 false Operation tests. 27.683 Section 27.683... STANDARDS: NORMAL CATEGORY ROTORCRAFT Design and Construction Control Systems § 27.683 Operation tests. It must be shown by operation tests that, when the controls are operated from the pilot compartment with...

  1. 33 CFR 159.123 - Coliform test: Type I devices.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 33 Navigation and Navigable Waters 2 2011-07-01 2011-07-01 false Coliform test: Type I devices. 159.123 Section 159.123 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) POLLUTION MARINE SANITATION DEVICES Design, Construction, and Testing § 159.123 Coliform test...

  2. 33 CFR 159.126 - Coliform test: Type II devices.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 33 Navigation and Navigable Waters 2 2011-07-01 2011-07-01 false Coliform test: Type II devices. 159.126 Section 159.126 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) POLLUTION MARINE SANITATION DEVICES Design, Construction, and Testing § 159.126 Coliform test...

  3. 33 CFR 241.7 - Application of test.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... payments, equals the amount of Federal expenditures (including sunk pre-construction engineering and design... 33 Navigation and Navigable Waters 3 2014-07-01 2014-07-01 false Application of test. 241.7... test. (a) A preliminary ability to pay test will be applied during the study phase of any proposed...

  4. 33 CFR 241.7 - Application of test.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... payments, equals the amount of Federal expenditures (including sunk pre-construction engineering and design... 33 Navigation and Navigable Waters 3 2010-07-01 2010-07-01 false Application of test. 241.7... test. (a) A preliminary ability to pay test will be applied during the study phase of any proposed...

  5. 33 CFR 241.7 - Application of test.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... payments, equals the amount of Federal expenditures (including sunk pre-construction engineering and design... 33 Navigation and Navigable Waters 3 2013-07-01 2013-07-01 false Application of test. 241.7... test. (a) A preliminary ability to pay test will be applied during the study phase of any proposed...

  6. 33 CFR 241.7 - Application of test.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... payments, equals the amount of Federal expenditures (including sunk pre-construction engineering and design... 33 Navigation and Navigable Waters 3 2012-07-01 2012-07-01 false Application of test. 241.7... test. (a) A preliminary ability to pay test will be applied during the study phase of any proposed...

  7. 33 CFR 241.7 - Application of test.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... payments, equals the amount of Federal expenditures (including sunk pre-construction engineering and design... 33 Navigation and Navigable Waters 3 2011-07-01 2011-07-01 false Application of test. 241.7... test. (a) A preliminary ability to pay test will be applied during the study phase of any proposed...

  8. 30 CFR 27.20 - Quality of material, workmanship, and design.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Quality of material, workmanship, and design. 27.20 Section 27.20 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR TESTING, EVALUATION, AND APPROVAL OF MINING PRODUCTS METHANE-MONITORING SYSTEMS Construction and Design...

  9. 76 FR 29728 - Notice of Intent To Prepare an Environmental Impact Statement and Notice of Potential Floodplain...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-23

    ... 2.0 program would proceed through 2020 with design, construction, operation, and monitoring... of this test includes project definition, design, procurement, manufacture, installation, startup... the repowered oxy-combustion design. The station contains existing infrastructure that could support...

  10. 30 CFR 27.20 - Quality of material, workmanship, and design.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 1 2011-07-01 2011-07-01 false Quality of material, workmanship, and design. 27.20 Section 27.20 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR TESTING, EVALUATION, AND APPROVAL OF MINING PRODUCTS METHANE-MONITORING SYSTEMS Construction and Design...

  11. Around Marshall

    NASA Image and Video Library

    1961-06-01

    At its founding, the Marshall Space Flight Center (MSFC) inherited the Army’s Jupiter and Redstone test stands, but much larger facilities were needed for the giant stages of the Saturn V. From 1960 to 1964, the existing stands were remodeled and a sizable new test area was developed. The new comprehensive test complex for propulsion and structural dynamics was unique within the nation and the free world, and they remain so today because they were constructed with foresight to meet the future as well as on going needs. Construction of the S-IC Static test stand complex began in 1961 in the west test area of MSFC, and was completed in 1964. The S-IC static test stand was designed to develop and test the 138-ft long and 33-ft diameter Saturn V S-IC first stage, or booster stage, weighing in at 280,000 pounds. Required to hold down the brute force of a 7,500,000-pound thrust produced by 5 F-1 engines, the S-IC static test stand was designed and constructed with the strength of hundreds of tons of steel and 12,000,000 pounds of cement, planted down to bedrock 40 feet below ground level. The foundation walls, constructed with concrete and steel, are 4 feet thick. The base structure consists of four towers with 40-foot-thick walls extending upward 144 feet above ground level. The structure was topped by a crane with a 135-foot boom. With the boom in the upright position, the stand was given an overall height of 405 feet, placing it among the highest structures in Alabama at the time. In this photo, taken July 13, 1961, progress is being made with the excavation of the S-IC test stand site. During the digging, a natural spring was disturbed which caused a constant flooding problem. Pumps were used to remove the water all through the construction process and the site is still pumped today.

  12. Around Marshall

    NASA Image and Video Library

    1961-08-05

    At its founding, the Marshall Space Flight Center (MSFC) inherited the Army’s Jupiter and Redstone test stands, but much larger facilities were needed for the giant stages of the Saturn V. From 1960 to 1964, the existing stands were remodeled and a sizable new test area was developed. The new comprehensive test complex for propulsion and structural dynamics was unique within the nation and the free world, and they remain so today because they were constructed with foresight to meet the future as well as on going needs. Construction of the S-IC Static test stand complex began in 1961 in the west test area of MSFC, and was completed in 1964. The S-IC static test stand was designed to develop and test the 138-ft long and 33-ft diameter Saturn V S-IC first stage, or booster stage, weighing in at 280,000 pounds. Required to hold down the brute force of a 7,500,000-pound thrust produced by 5 F-1 engines, the S-IC static test stand was designed and constructed with the strength of hundreds of tons of steel and 12,000,000 pounds of cement, planted down to bedrock 40 feet below ground level. The foundation walls, constructed with concrete and steel, are 4 feet thick. The base structure consists of four towers with 40-foot-thick walls extending upward 144 feet above ground level. The structure was topped by a crane with a 135-foot boom. With the boom in the upright position, the stand was given an overall height of 405 feet, placing it among the highest structures in Alabama at the time. In this photograph taken on August 5th, 1961, a back hoe is nearly submerged in water in the test stand site. During the initial digging, the disturbance of a natural spring contributed to constant water problems during the construction process. It was necessary to pump the water from the site on a daily basis and is still pumped from the site today.

  13. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Denslow, Kayte M.; Bontha, Jagannadha R.; Adkins, Harold E.

    This document presents the visual and ultrasonic PulseEcho critical velocity test results obtained from the System Performance test campaign that was completed in September 2012 with the Remote Sampler Demonstration (RSD)/Waste Feed Flow Loop cold-test platform located at the Monarch test facility in Pasco, Washington. This report is intended to complement and accompany the report that will be developed by WRPS on the design of the System Performance simulant matrix, the analysis of the slurry test sample concentration and particle size distribution (PSD) data, and the design and construction of the RSD/Waste Feed Flow Loop cold-test platform.

  14. Development of a tornado safe room door from wood Products: door design and impact testing

    Treesearch

    Robert H. Falk; James J. Bridwell

    2016-01-01

    In this study, a tornado safe room door built from wood products and steel sheeting was developed and impact-tested according to tornado safe room standards. Results indicate that an door constructed from as few as two sheets of 23/32-in. (18.26-mm) construction-grade plywood and overlaid with 18-gauge (0.05-in.- (1.27- mm-) thick) steel can pass the required impact...

  15. Variable speed gas engine-driven air compressor system

    NASA Astrophysics Data System (ADS)

    Morgan, J. R.; Ruggles, A. E.; Chen, T. N.; Gehret, J.

    1992-11-01

    Tecogen Inc. and Ingersoll-Rand Co. as a subcontractor have designed a nominal 150-hp gas engine-driven air compressor utilizing the TECODRIVE 8000 engine and the Ingersoll-Rand 178.5-mm twin screw compressor. Phase 1 included the system engineering and design, economic and applications studies, and a draft commercialization plan. Phase 2 included controls development, laboratory prototype construction, and performance testing. The testing conducted verified that the compressor meets all design specifications.

  16. Construction Progress of the S-IC Test Stand Complex Bunker House

    NASA Technical Reports Server (NTRS)

    1963-01-01

    At its founding, the Marshall Space Flight Center (MSFC) inherited the Army's Jupiter and Redstone test stands, but much larger facilities were needed for the giant stages of the Saturn V. From 1960 to 1964, the existing stands were remodeled and a sizable new test area was developed. The new comprehensive test complex for propulsion and structural dynamics was unique within the nation and the free world, and they remain so today because they were constructed with foresight to meet the future as well as on going needs. Construction of the S-IC Static test stand complex began in 1961 in the west test area of MSFC, and was completed in 1964. The S-IC static test stand was designed to develop and test the 138-ft long and 33-ft diameter Saturn V S-IC first stage, or booster stage, weighing in at 280,000 pounds. Required to hold down the brute force of a 7,500,000-pound thrust produced by 5 F-1 engines, the S-IC static test stand was designed and constructed with the strength of hundreds of tons of steel and 12,000,000 pounds of cement, planted down to bedrock 40 feet below ground level. The foundation walls, constructed with concrete and steel, are 4 feet thick. The base structure consists of four towers with 40-foot-thick walls extending upward 144 feet above ground level. The structure was topped by a crane with a 135-foot boom. With the boom in the upright position, the stand was given an overall height of 405 feet, placing it among the highest structures in Alabama at the time. In addition to the S-IC stand, additional related facilities were built during this time frame. Built to the east of the S-IC stand, the block house served as the control room. To the south of the blockhouse was a newly constructed pump house used for delivering water to the S-IC stand during testing. North of the massive test stand, the F-1 Engine test stand was built for testing a single F-1 engine. Just southeast of the S-IC stand a concrete bunker house was constructed. The bunker housed an emergency crew clad in fire proof gear, who were close at hand should any emergencies arise during testing. This photo of the completed bunker house was taken on May 7, 1963.

  17. High Temperature, Permanent Magnet Biased, Fault Tolerant, Homopolar Magnetic Bearing Development

    NASA Technical Reports Server (NTRS)

    Palazzolo, Alan; Tucker, Randall; Kenny, Andrew; Kang, Kyung-Dae; Ghandi, Varun; Liu, Jinfang; Choi, Heeju; Provenza, Andrew

    2008-01-01

    This paper summarizes the development of a magnetic bearing designed to operate at 1,000 F. A novel feature of this high temperature magnetic bearing is its homopolar construction which incorporates state of the art high temperature, 1,000 F, permanent magnets. A second feature is its fault tolerance capability which provides the desired control forces with over one-half of the coils failed. The construction and design methodology of the bearing is outlined and test results are shown. The agreement between a 3D finite element, magnetic field based prediction for force is shown to be in good agreement with predictions at room and high temperature. A 5 axis test rig will be complete soon to provide a means to test the magnetic bearings at high temperature and speed.

  18. Isothermal Dendritic Growth Experiment - Science, engineering, and hardware development for USMP space flights

    NASA Technical Reports Server (NTRS)

    Glicksman, M. E.; Hahn, R. C.; Koss, M. B.; Tirmizi, S. H.; Selleck, M. E.; Velosa, A.; Winsa, E.

    1991-01-01

    The Isothermal Dendritic Growth Experiment (IDGE) has been designed to provide microgravity data on dendritic growth for a critical test of theory. This paper updates progress on constructing a crystal growth chamber suitable for space flight. The IDGE chamber is constructed from glass and stainless steel and is hermetically sealed by electron beam welds and glass-metal seals. Initial tests of the chambers sample's melting point plateau show that the new chamber design is capable of preserving the 99.9995 percent purity of succinonitrile. Dendrite growth can be initiated in the center of the IDGE chamber by means of thermo-electric coolers and a capillary injector tube (stinger). The new IDGE chamber is ready for fully integrated tests with the prototype IDGE engineering hardware at NASA's Lewis Research Center.

  19. Around Marshall

    NASA Image and Video Library

    1962-03-31

    At its founding, the Marshall Space Flight Center (MSFC) inherited the Army’s Jupiter and Redstone test stands, but much larger facilities were needed for the giant stages of the Saturn V. From 1960 to 1964, the existing stands were remodeled and a sizable new test area was developed. The new comprehensive test complex for propulsion and structural dynamics was unique within the nation and the free world, and they remain so today because they were constructed with foresight to meet the future as well as on going needs. Construction of the S-IC Static test stand complex began in 1961 in the west test area of MSFC, and was completed in 1964. The S-IC static test stand was designed to develop and test the 138-ft long and 33-ft diameter Saturn V S-IC first stage, or booster stage, weighing in at 280,000 pounds. Required to hold down the brute force of a 7,500,000-pound thrust produced by 5 F-1 engines, the S-IC static test stand was designed and constructed with the strength of hundreds of tons of steel and 12,000,000 pounds of cement, planted down to bedrock 40 feet below ground level. The foundation walls, constructed with concrete and steel, are 4 feet thick. The base structure consists of four towers with 40-foot-thick walls extending upward 144 feet above ground level. The structure was topped by a crane with a 135-foot boom. With the boom in the upright position, the stand was given an overall height of 405 feet, placing it among the highest structures in Alabama at the time. Construction of the S-IC test stand came to a halt at the end of September 1961 as the determination was made that the Saturn booster size had to be increased. As a result, the stand had to be modified. With construction about to resume, portable, floating pump stations were placed in the site to drain the flood waters caused by a disturbed natural spring months prior during excavation. In this March 31, 1962 photo, the foundation walls can once again be seen.

  20. Around Marshall

    NASA Image and Video Library

    1961-12-22

    At its founding, the Marshall Space Flight Center (MSFC) inherited the Army’s Jupiter and Redstone test stands, but much larger facilities were needed for the giant stages of the Saturn V. From 1960 to 1964, the existing stands were remodeled and a sizable new test area was developed. The new comprehensive test complex for propulsion and structural dynamics was unique within the nation and the free world, and they remain so today because they were constructed with foresight to meet the future as well as on going needs. Construction of the S-IC Static test stand complex began in 1961 in the west test area of MSFC, and was completed in 1964. The S-IC static test stand was designed to develop and test the 138-ft long and 33-ft diameter Saturn V S-IC first stage, or booster stage, weighing in at 280,000 pounds. Required to hold down the brute force of a 7,500,000-pound thrust produced by 5 F-1 engines, the S-IC static test stand was designed and constructed with the strength of hundreds of tons of steel and 12,000,000 pounds of cement, planted down to bedrock 40 feet below ground level. The foundation walls, constructed with concrete and steel, are 4 feet thick. The base structure consists of four towers with 40-foot-thick walls extending upward 144 feet above ground level. The structure was topped by a crane with a 135-foot boom. With the boom in the upright position, the stand was given an overall height of 405 feet, placing it among the highest structures in Alabama at the time. Construction of the S-IC test stand came to a halt at the end of September as the determination was made that the Saturn booster size had to be increased. As a result, the stand had to be modified. With construction delayed, and pumps turned off, this photo, taken December 22, 1961, shows danger signs posted around the abandoned site with floods nearing the top. The flooding was caused by the disturbance of a natural spring months prior during the excavation of the site.

  1. Around Marshall

    NASA Image and Video Library

    1962-03-15

    At its founding, the Marshall Space Flight Center (MSFC) inherited the Army’s Jupiter and Redstone test stands, but much larger facilities were needed for the giant stages of the Saturn V. From 1960 to 1964, the existing stands were remodeled and a sizable new test area was developed. The new comprehensive test complex for propulsion and structural dynamics was unique within the nation and the free world, and they remain so today because they were constructed with foresight to meet the future as well as on going needs. Construction of the S-IC Static test stand complex began in 1961 in the west test area of MSFC, and was completed in 1964. The S-IC static test stand was designed to develop and test the 138-ft long and 33-ft diameter Saturn V S-IC first stage, or booster stage, weighing in at 280,000 pounds. Required to hold down the brute force of a 7,500,000-pound thrust produced by 5 F-1 engines, the S-IC static test stand was designed and constructed with the strength of hundreds of tons of steel and 12,000,000 pounds of cement, planted down to bedrock 40 feet below ground level. The foundation walls, constructed with concrete and steel, are 4 feet thick. The base structure consists of four towers with 40-foot-thick walls extending upward 144 feet above ground level. The structure was topped by a crane with a 135-foot boom. With the boom in the upright position, the stand was given an overall height of 405 feet, placing it among the highest structures in Alabama at the time. Construction of the S-IC test stand came to a halt at the end of September as the determination was made that the Saturn booster size had to be increased. As a result, the stand had to be modified. With construction delayed, and pumps turned off, this photo, taken March 15, 1962, shows danger signs posted around the abandoned, flooded site. The flooding was caused by the disturbance of a natural spring months prior during the excavation of the site.

  2. Around Marshall

    NASA Image and Video Library

    1962-03-20

    At its founding, the Marshall Space Flight Center (MSFC) inherited the Army’s Jupiter and Redstone test stands, but much larger facilities were needed for the giant stages of the Saturn V. From 1960 to 1964, the existing stands were remodeled and a sizable new test area was developed. The new comprehensive test complex for propulsion and structural dynamics was unique within the nation and the free world, and they remain so today because they were constructed with foresight to meet the future as well as on going needs. Construction of the S-IC Static test stand complex began in 1961 in the west test area of MSFC, and was completed in 1964. The S-IC static test stand was designed to develop and test the 138-ft long and 33-ft diameter Saturn V S-IC first stage, or booster stage, weighing in at 280,000 pounds. Required to hold down the brute force of a 7,500,000-pound thrust produced by 5 F-1 engines, the S-IC static test stand was designed and constructed with the strength of hundreds of tons of steel and 12,000,000 pounds of cement, planted down to bedrock 40 feet below ground level. The foundation walls, constructed with concrete and steel, are 4 feet thick. The base structure consists of four towers with 40-foot-thick walls extending upward 144 feet above ground level. The structure was topped by a crane with a 135-foot boom. With the boom in the upright position, the stand was given an overall height of 405 feet, placing it among the highest structures in Alabama at the time. Construction of the S-IC test stand came to a halt at the end of September as the determination was made that the Saturn booster size had to be increased. As a result, the stand had to be modified. With construction about to resume, portable floating pump stations were placed in the site, as seen in this March 20, 1962 photo, to drain the flood waters caused by a disturbed natural spring months prior during excavation.

  3. Around Marshall

    NASA Image and Video Library

    1961-12-04

    At its founding, the Marshall Space Flight Center (MSFC) inherited the Army’s Jupiter and Redstone test stands, but much larger facilities were needed for the giant stages of the Saturn V. From 1960 to 1964, the existing stands were remodeled and a sizable new test area was developed. The new comprehensive test complex for propulsion and structural dynamics was unique within the nation and the free world, and they remain so today because they were constructed with foresight to meet the future as well as on going needs. Construction of the S-IC Static test stand complex began in 1961 in the west test area of MSFC, and was completed in 1964. The S-IC static test stand was designed to develop and test the 138-ft long and 33-ft diameter Saturn V S-IC first stage, or booster stage, weighing in at 280,000 pounds. Required to hold down the brute force of a 7,500,000-pound thrust produced by 5 F-1 engines, the S-IC static test stand was designed and constructed with the strength of hundreds of tons of steel and 12,000,000 pounds of cement, planted down to bedrock 40 feet below ground level. The foundation walls, constructed with concrete and steel, are 4 feet thick. The base structure consists of four towers with 40-foot-thick walls extending upward 144 feet above ground level. The structure was topped by a crane with a 135-foot boom. With the boom in the upright position, the stand was given an overall height of 405 feet, placing it among the highest structures in Alabama at the time. Construction of the S-IC test stand came to a halt at the end of September as the determination was made that the Saturn booster size had to be increased. As a result, the stand had to be modified. With construction delayed, and pumps turned off, this photo, taken December 4, 1961, shows the abandoned site with floods at the 11 ft mark. The flooding was caused by the disturbance of a natural spring months prior during the excavation of the site.

  4. Around Marshall

    NASA Image and Video Library

    1961-12-18

    At its founding, the Marshall Space Flight Center (MSFC) inherited the Army’s Jupiter and Redstone test stands, but much larger facilities were needed for the giant stages of the Saturn V. From 1960 to 1964, the existing stands were remodeled and a sizable new test area was developed. The new comprehensive test complex for propulsion and structural dynamics was unique within the nation and the free world, and they remain so today because they were constructed with foresight to meet the future as well as on going needs. Construction of the S-IC Static test stand complex began in 1961 in the west test area of MSFC, and was completed in 1964. The S-IC static test stand was designed to develop and test the 138-ft long and 33-ft diameter Saturn V S-IC first stage, or booster stage, weighing in at 280,000 pounds. Required to hold down the brute force of a 7,500,000-pound thrust produced by 5 F-1 engines, the S-IC static test stand was designed and constructed with the strength of hundreds of tons of steel and 12,000,000 pounds of cement, planted down to bedrock 40 feet below ground level. The foundation walls, constructed with concrete and steel, are 4 feet thick. The base structure consists of four towers with 40-foot-thick walls extending upward 144 feet above ground level. The structure was topped by a crane with a 135-foot boom. With the boom in the upright position, the stand was given an overall height of 405 feet, placing it among the highest structures in Alabama at the time. Construction of the S-IC test stand came to a halt at the end of September as the determination was made that the Saturn booster size had to be increased. As a result, the stand had to be modified. With construction delayed, and pumps turned off, this photo, taken December 18, 1961, shows the abandoned site entirely flooded. The flooding was caused by the disturbance of a natural spring months prior during the excavation of the site.

  5. Around Marshall

    NASA Image and Video Library

    1961-12-11

    At its founding, the Marshall Space Flight Center (MSFC) inherited the Army’s Jupiter and Redstone test stands, but much larger facilities were needed for the giant stages of the Saturn V. From 1960 to 1964, the existing stands were remodeled and a sizable new test area was developed. The new comprehensive test complex for propulsion and structural dynamics was unique within the nation and the free world, and they remain so today because they were constructed with foresight to meet the future as well as on going needs. Construction of the S-IC Static test stand complex began in 1961 in the west test area of MSFC, and was completed in 1964. The S-IC static test stand was designed to develop and test the 138-ft long and 33-ft diameter Saturn V S-IC first stage, or booster stage, weighing in at 280,000 pounds. Required to hold down the brute force of a 7,500,000-pound thrust produced by 5 F-1 engines, the S-IC static test stand was designed and constructed with the strength of hundreds of tons of steel and 12,000,000 pounds of cement, planted down to bedrock 40 feet below ground level. The foundation walls, constructed with concrete and steel, are 4 feet thick. The base structure consists of four towers with 40-foot-thick walls extending upward 144 feet above ground level. The structure was topped by a crane with a 135-foot boom. With the boom in the upright position, the stand was given an overall height of 405 feet, placing it among the highest structures in Alabama at the time. Construction of the S-IC test stand came to a halt at the end of September as the determination was made that the Saturn booster size had to be increased. As a result, the stand had to be modified. With construction delayed, and pumps turned off, this photo, taken December 11, 1961, shows the abandoned site with floods above the 18 ft mark. The flooding was caused by the disturbance of a natural spring months prior during the excavation of the site.

  6. Around Marshall

    NASA Image and Video Library

    1961-12-01

    At its founding, the Marshall Space Flight Center (MSFC) inherited the Army’s Jupiter and Redstone test stands, but much larger facilities were needed for the giant stages of the Saturn V. From 1960 to 1964, the existing stands were remodeled and a sizable new test area was developed. The new comprehensive test complex for propulsion and structural dynamics was unique within the nation and the free world, and they remain so today because they were constructed with foresight to meet the future as well as on going needs. Construction of the S-IC Static test stand complex began in 1961 in the west test area of MSFC, and was completed in 1964. The S-IC static test stand was designed to develop and test the 138-ft long and 33-ft diameter Saturn V S-IC first stage, or booster stage, weighing in at 280,000 pounds. Required to hold down the brute force of a 7,500,000-pound thrust produced by 5 F-1 engines, the S-IC static test stand was designed and constructed with the strength of hundreds of tons of steel and 12,000,000 pounds of cement, planted down to bedrock 40 feet below ground level. The foundation walls, constructed with concrete and steel, are 4 feet thick. The base structure consists of four towers with 40-foot-thick walls extending upward 144 feet above ground level. The structure was topped by a crane with a 135-foot boom. With the boom in the upright position, the stand was given an overall height of 405 feet, placing it among the highest structures in Alabama at the time. Construction of the S-IC test stand came to a halt at the end of September as the determination was made that the Saturn booster size had to be increased. As a result, the stand had to be modified. With construction delayed, and pumps turned off, this photo, taken December 1, 1961, shows the abandoned site with floods at the 6 ft mark. The flooding was caused by the disturbance of a natural spring months prior during the excavation of the site.

  7. Around Marshall

    NASA Image and Video Library

    1962-04-04

    At its founding, the Marshall Space Flight Center (MSFC) inherited the Army’s Jupiter and Redstone test stands, but much larger facilities were needed for the giant stages of the Saturn V. From 1960 to 1964, the existing stands were remodeled and a sizable new test area was developed. The new comprehensive test complex for propulsion and structural dynamics was unique within the nation and the free world, and they remain so today because they were constructed with foresight to meet the future as well as on going needs. Construction of the S-IC Static test stand complex began in 1961 in the west test area of MSFC, and was completed in 1964. The S-IC static test stand was designed to develop and test the 138-ft long and 33-ft diameter Saturn V S-IC first stage, or booster stage, weighing in at 280,000 pounds. Required to hold down the brute force of a 7,500,000-pound thrust produced by 5 F-1 engines, the S-IC static test stand was designed and constructed with the strength of hundreds of tons of steel and 12,000,000 pounds of cement, planted down to bedrock 40 feet below ground level. The foundation walls, constructed with concrete and steel, are 4 feet thick. The base structure consists of four towers with 40-foot-thick walls extending upward 144 feet above ground level. The structure was topped by a crane with a 135-foot boom. With the boom in the upright position, the stand was given an overall height of 405 feet, placing it among the highest structures in Alabama at the time. This photo, taken April 4, 1961, shows the S-IC test stand dry once again when workers resumed construction after a 6 month delay due to booster size reconfiguration back in September of 1961. The disturbance of a natural spring during the excavation of the site required water to be pumped from the site continuously. The site was completely flooded after the pumps were shut down during the construction delay.

  8. n/a

    NASA Image and Video Library

    1961-12-11

    At its founding, the Marshall Space Flight Center (MSFC) inherited the Army’s Jupiter and Redstone test stands, but much larger facilities were needed for the giant stages of the Saturn V. From 1960 to 1964, the existing stands were remodeled and a sizable new test area was developed. The new comprehensive test complex for propulsion and structural dynamics was unique within the nation and the free world, and they remain so today because they were constructed with foresight to meet the future as well as on going needs. Construction of the S-IC Static test stand complex began in 1961 in the west test area of MSFC, and was completed in 1964. The S-IC static test stand was designed to develop and test the 138-ft long and 33-ft diameter Saturn V S-IC first stage, or booster stage, weighing in at 280,000 pounds. Required to hold down the brute force of a 7,500,000-pound thrust produced by 5 F-1 engines, the S-IC static test stand was designed and constructed with the strength of hundreds of tons of steel and 12,000,000 pounds of cement, planted down to bedrock 40 feet below ground level. The foundation walls, constructed with concrete and steel, are 4 feet thick. The base structure consists of four towers with 40-foot-thick walls extending upward 144 feet above ground level. The structure was topped by a crane with a 135-foot boom. With the boom in the upright position, the stand was given an overall height of 405 feet, placing it among the highest structures in Alabama at the time. Construction of the S-IC test stand came to a halt at the end of September as the determination was made that the Saturn booster size had to be increased. As a result, the stand had to be modified. With construction delayed, and pumps turned off, this photo, taken December 11, 1961, shows the abandoned site with floods above the 18 ft mark. The flooding was caused by the disturbance of a natural spring months prior during the excavation of the site.

  9. Around Marshall

    NASA Image and Video Library

    1961-12-08

    At its founding, the Marshall Space Flight Center (MSFC) inherited the Army’s Jupiter and Redstone test stands, but much larger facilities were needed for the giant stages of the Saturn V. From 1960 to 1964, the existing stands were remodeled and a sizable new test area was developed. The new comprehensive test complex for propulsion and structural dynamics was unique within the nation and the free world, and they remain so today because they were constructed with foresight to meet the future as well as on going needs. Construction of the S-IC Static test stand complex began in 1961 in the west test area of MSFC, and was completed in 1964. The S-IC static test stand was designed to develop and test the 138-ft long and 33-ft diameter Saturn V S-IC first stage, or booster stage, weighing in at 280,000 pounds. Required to hold down the brute force of a 7,500,000-pound thrust produced by 5 F-1 engines, the S-IC static test stand was designed and constructed with the strength of hundreds of tons of steel and 12,000,000 pounds of cement, planted down to bedrock 40 feet below ground level. The foundation walls, constructed with concrete and steel, are 4 feet thick. The base structure consists of four towers with 40-foot-thick walls extending upward 144 feet above ground level. The structure was topped by a crane with a 135-foot boom. With the boom in the upright position, the stand was given an overall height of 405 feet, placing it among the highest structures in Alabama at the time. Construction of the S-IC test stand came to a halt at the end of September as the determination was made that the Saturn booster size had to be increased. As a result, the stand had to be modified. With construction delayed, and pumps turned off, this photo, taken December 8, 1961, shows the abandoned site with floods at the 16 ft mark. The flooding was caused by the disturbance of a natural spring months prior during the excavation of the site.

  10. Around Marshall

    NASA Image and Video Library

    1961-12-04

    At its founding, the Marshall Space Flight Center (MSFC) inherited the Army’s Jupiter and Redstone test stands, but much larger facilities were needed for the giant stages of the Saturn V. From 1960 to 1964, the existing stands were remodeled and a sizable new test area was developed. The new comprehensive test complex for propulsion and structural dynamics was unique within the nation and the free world, and they remain so today because they were constructed with foresight to meet the future as well as on going needs. Construction of the S-IC Static test stand complex began in 1961 in the west test area of MSFC, and was completed in 1964. The S-IC static test stand was designed to develop and test the 138-ft long and 33-ft diameter Saturn V S-IC first stage, or booster stage, weighing in at 280,000 pounds. Required to hold down the brute force of a 7,500,000-pound thrust produced by 5 F-1 engines, the S-IC static test stand was designed and constructed with the strength of hundreds of tons of steel and 12,000,000 pounds of cement, planted down to bedrock 40 feet below ground level. The foundation walls, constructed with concrete and steel, are 4 feet thick. The base structure consists of four towers with 40-foot-thick walls extending upward 144 feet above ground level. The structure was topped by a crane with a 135-foot boom. With the boom in the upright position, the stand was given an overall height of 405 feet, placing it among the highest structures in Alabama at the time. Construction of the S-IC test stand came to a halt at the end of September as the determination was made that the Saturn booster size had to be increased. As a result, the stand would have to be modified. With construction delayed, and pumps turned off, this photo, taken December 4, 1961, shows the abandoned site with floods at the 11 ft mark. The flooding was caused by the disturbance of a natural spring months prior during the excavation of the site.

  11. Around Marshall

    NASA Image and Video Library

    1961-12-14

    At its founding, the Marshall Space Flight Center (MSFC) inherited the Army’s Jupiter and Redstone test stands, but much larger facilities were needed for the giant stages of the Saturn V. From 1960 to 1964, the existing stands were remodeled and a sizable new test area was developed. The new comprehensive test complex for propulsion and structural dynamics was unique within the nation and the free world, and they remain so today because they were constructed with foresight to meet the future as well as on going needs. Construction of the S-IC Static test stand complex began in 1961 in the west test area of MSFC, and was completed in 1964. The S-IC static test stand was designed to develop and test the 138-ft long and 33-ft diameter Saturn V S-IC first stage, or booster stage, weighing in at 280,000 pounds. Required to hold down the brute force of a 7,500,000-pound thrust produced by 5 F-1 engines, the S-IC static test stand was designed and constructed with the strength of hundreds of tons of steel and 12,000,000 pounds of cement, planted down to bedrock 40 feet below ground level. The foundation walls, constructed with concrete and steel, are 4 feet thick. The base structure consists of four towers with 40-foot-thick walls extending upward 144 feet above ground level. The structure was topped by a crane with a 135-foot boom. With the boom in the upright position, the stand was given an overall height of 405 feet, placing it among the highest structures in Alabama at the time. Construction of the S-IC test stand came to a halt at the end of September as the determination was made that the Saturn booster size had to be increased. As a result, the stand had to be modified. With construction delayed, and pumps turned off, this photo, taken December 14, 1961, shows the abandoned site entirely flooded. The flooding was caused by the disturbance of a natural spring months prior during the excavation of the site.

  12. Around Marshall

    NASA Image and Video Library

    1962-02-02

    At its founding, the Marshall Space Flight Center (MSFC) inherited the Army’s Jupiter and Redstone test stands, but much larger facilities were needed for the giant stages of the Saturn V. From 1960 to 1964, the existing stands were remodeled and a sizable new test area was developed. The new comprehensive test complex for propulsion and structural dynamics was unique within the nation and the free world, and they remain so today because they were constructed with foresight to meet the future as well as on going needs. Construction of the S-IC Static test stand complex began in 1961 in the west test area of MSFC, and was completed in 1964. The S-IC static test stand was designed to develop and test the 138-ft long and 33-ft diameter Saturn V S-IC first stage, or booster stage, weighing in at 280,000 pounds. Required to hold down the brute force of a 7,500,000-pound thrust produced by 5 F-1 engines, the S-IC static test stand was designed and constructed with the strength of hundreds of tons of steel and 12,000,000 pounds of cement, planted down to bedrock 40 feet below ground level. The foundation walls, constructed with concrete and steel, are 4 feet thick. The base structure consists of four towers with 40-foot-thick walls extending upward 144 feet above ground level. The structure was topped by a crane with a 135-foot boom. With the boom in the upright position, the stand was given an overall height of 405 feet, placing it among the highest structures in Alabama at the time. Construction of the S-IC test stand came to a halt at the end of September as the determination was made that the Saturn booster size had to be increased. As a result, the stand had to be modified. With construction delayed, and pumps turned off, this photo, taken February 2, 1962, shows the abandoned flooded site. The flooding was caused by the disturbance of a natural spring months prior during the excavation of the site.

  13. Integrated modeling tool for performance engineering of complex computer systems

    NASA Technical Reports Server (NTRS)

    Wright, Gary; Ball, Duane; Hoyt, Susan; Steele, Oscar

    1989-01-01

    This report summarizes Advanced System Technologies' accomplishments on the Phase 2 SBIR contract NAS7-995. The technical objectives of the report are: (1) to develop an evaluation version of a graphical, integrated modeling language according to the specification resulting from the Phase 2 research; and (2) to determine the degree to which the language meets its objectives by evaluating ease of use, utility of two sets of performance predictions, and the power of the language constructs. The technical approach followed to meet these objectives was to design, develop, and test an evaluation prototype of a graphical, performance prediction tool. The utility of the prototype was then evaluated by applying it to a variety of test cases found in the literature and in AST case histories. Numerous models were constructed and successfully tested. The major conclusion of this Phase 2 SBIR research and development effort is that complex, real-time computer systems can be specified in a non-procedural manner using combinations of icons, windows, menus, and dialogs. Such a specification technique provides an interface that system designers and architects find natural and easy to use. In addition, PEDESTAL's multiview approach provides system engineers with the capability to perform the trade-offs necessary to produce a design that meets timing performance requirements. Sample system designs analyzed during the development effort showed that models could be constructed in a fraction of the time required by non-visual system design capture tools.

  14. Case study of restaurant successfully designed, constructed, and operated for excellent dining acoustics

    NASA Astrophysics Data System (ADS)

    Bollard, Paul; Des Jardins, Stephen

    2005-09-01

    Prior to the construction of La Provence Restaurant in Roseville, California in 2004, the owner, Stephen Des Jardins, traveled with his cook, architect, and engineer to the Provence Region of France to study the cuisine, architecture, and acoustics of the local restaurants. This information was incorporated into the design, construction, and operation of his restaurant, with acoustical design assistance provided by the author, Paul Bollard. The result of the owner's painstaking attention to detail is a restaurant which has received very positive reviews for its architecture, quality of food, service, and acoustic ambience. This paper documents the measures included in the construction of the restaurant to ensure that the building acoustics enhance the dining experience, rather than detract from it. Photographs of acoustic treatments are included, as are reverberation time (RT60) test results and ambient noise level measurement results.

  15. n/a

    NASA Image and Video Library

    1963-01-15

    At its founding, the Marshall Space Flight Center (MSFC) inherited the Army’s Jupiter and Redstone test stands, but much larger facilities were needed for the giant stages of the Saturn V. From 1960 to 1964, the existing stands were remodeled and a sizable new test area was developed. The new comprehensive test complex for propulsion and structural dynamics was unique within the nation and the free world, and they remain so today because they were constructed with foresight to meet the future as well as on going needs. Construction of the S-IC Static test stand complex began in 1961 in the west test area of MSFC, and was completed in 1964. The S-IC static test stand was designed to develop and test the 138-ft long and 33-ft diameter Saturn V S-IC first stage, or booster stage, weighing in at 280,000 pounds. Required to hold down the brute force of a 7,500,000-pound thrust produced by 5 F-1 engines, the S-IC static test stand was designed and constructed with the strength of hundreds of tons of steel and 12,000,000 pounds of cement, planted down to bedrock 40 feet below ground level. The foundation walls, constructed with concrete and steel, are 4 feet thick. The base structure consists of four towers with 40-foot-thick walls extending upward 144 feet above ground level. The structure was topped by a crane with a 135-foot boom. With the boom in the upright position, the stand was given an overall height of 405 feet, placing it among the highest structures in Alabama at the time. In addition to the stand itself, related facilities were constructed during this time. Built directly east of the test stand was the Block House, which served as the control center for the test stand. The two were connected by a narrow access tunnel which housed the cables for the controls. The F-1 Engine test stand was built north of the massive S-IC test stand. The F-1 test stand is a vertical engine firing test stand, 239 feet in elevation and 4,600 square feet in area at the base, and was designed to assist in the development of the F-1 Engine. Capability is provided for static firing of 1.5 million pounds of thrust using liquid oxygen and kerosene. Like the S-IC stand, the foundation of the F-1 stand is keyed into the bedrock approximately 40 feet below grade. This aerial photograph, taken January 15, 1963 gives an overall view of the construction progress of the newly developed test complex. The large white building located in the center is the Block House. Just below and to the right of it is the S-IC test stand. The large hole to the left of the S-IC stand is the F-1 test stand site.

  16. Around Marshall

    NASA Image and Video Library

    1963-04-17

    At its founding, the Marshall Space Flight Center (MSFC) inherited the Army’s Jupiter and Redstone test stands, but much larger facilities were needed for the giant stages of the Saturn V. From 1960 to 1964, the existing stands were remodeled and a sizable new test area was developed. The new comprehensive test complex for propulsion and structural dynamics was unique within the nation and the free world, and they remain so today because they were constructed with foresight to meet the future as well as on going needs. Construction of the S-IC Static test stand complex began in 1961 in the west test area of MSFC, and was completed in 1964. The S-IC static test stand was designed to develop and test the 138-ft long and 33-ft diameter Saturn V S-IC first stage, or booster stage, weighing in at 280,000 pounds. Required to hold down the brute force of a 7,500,000-pound thrust produced by 5 F-1 engines, the S-IC static test stand was designed and constructed with the strength of hundreds of tons of steel and 12,000,000 pounds of cement, planted down to bedrock 40 feet below ground level. The foundation walls, constructed with concrete and steel, are 4 feet thick. The base structure consists of four towers with 40-foot-thick walls extending upward 144 feet above ground level. The structure was topped by a crane with a 135-foot boom. With the boom in the upright position, the stand was given an overall height of 405 feet, placing it among the highest structures in Alabama at the time. This photograph taken April 17, 1963, gives a look at the four tower legs of the S-IC test stand at their completed height.

  17. Around Marshall

    NASA Image and Video Library

    1961-07-21

    At its founding, the Marshall Space Flight Center (MSFC) inherited the Army’s Jupiter and Redstone test stands, but much larger facilities were needed for the giant stages of the Saturn V. From 1960 to 1964, the existing stands were remodeled and a sizable new test area was developed. The new comprehensive test complex for propulsion and structural dynamics was unique within the nation and the free world, and they remain so today because they were constructed with foresight to meet the future as well as on going needs. Construction of the S-IC Static test stand complex began in 1961 in the west test area of MSFC, and was completed in 1964. The S-IC static test stand was designed to develop and test the 138-ft long and 33-ft diameter Saturn V S-IC first stage, or booster stage, weighing in at 280,000 pounds. Required to hold down the brute force of a 7,500,000-pound thrust produced by 5 F-1 engines, the S-IC static test stand was designed and constructed with the strength of hundreds of tons of steel and 12,000,000 pounds of cement, planted down to bedrock 40 feet below ground level. The foundation walls, constructed with concrete and steel, are 4 feet thick. The base structure consists of four towers with 40-foot-thick walls extending upward 144 feet above ground level. The structure was topped by a crane with a 135-foot boom. With the boom in the upright position, the stand was given an overall height of 405 feet, placing it among the highest structures in Alabama at the time. In this photo, taken July 21, 1961, a worker can be seen inside the test stand work area with a jack hammer.

  18. Around Marshall

    NASA Image and Video Library

    1963-11-20

    At its founding, the Marshall Space Flight Center (MSFC) inherited the Army’s Jupiter and Redstone test stands, but much larger facilities were needed for the giant stages of the Saturn V. From 1960 to 1964, the existing stands were remodeled and a sizable new test area was developed. The new comprehensive test complex for propulsion and structural dynamics was unique within the nation and the free world, and they remain so today because they were constructed with foresight to meet the future as well as on going needs. Construction of the S-IC Static test stand complex began in 1961 in the west test area of MSFC, and was completed in 1964. The S-IC static test stand was designed to develop and test the 138-ft long and 33-ft diameter Saturn V S-IC first stage, or booster stage, weighing in at 280,000 pounds. Required to hold down the brute force of a 7,500,000-pound thrust produced by 5 F-1 engines, the S-IC static test stand was designed and constructed with the strength of hundreds of tons of steel and 12,000,000 pounds of cement, planted down to bedrock 40 feet below ground level. The foundation walls, constructed with concrete and steel, are 4 feet thick. The base structure consists of four towers with 40-foot-thick walls extending upward 144 feet above ground level. The structure was topped by a crane with a 135-foot boom. With the boom in the upright position, the stand was given an overall height of 405 feet, placing it among the highest structures in Alabama at the time. This photo shows the progress of the S-IC test stand as of November 20, 1963.

  19. Around Marshall

    NASA Image and Video Library

    1963-06-24

    At its founding, the Marshall Space Flight Center (MSFC) inherited the Army’s Jupiter and Redstone test stands, but much larger facilities were needed for the giant stages of the Saturn V. From 1960 to 1964, the existing stands were remodeled and a sizable new test area was developed. The new comprehensive test complex for propulsion and structural dynamics was unique within the nation and the free world, and they remain so today because they were constructed with foresight to meet the future as well as on going needs. Construction of the S-IC Static test stand complex began in 1961 in the west test area of MSFC, and was completed in 1964. The S-IC static test stand was designed to develop and test the 138-ft long and 33-ft diameter Saturn V S-IC first stage, or booster stage, weighing in at 280,000 pounds. Required to hold down the brute force of a 7,500,000-pound thrust produced by 5 F-1 engines, the S-IC static test stand was designed and constructed with the strength of hundreds of tons of steel and 12,000,000 pounds of cement, planted down to bedrock 40 feet below ground level. The foundation walls, constructed with concrete and steel, are 4 feet thick. The base structure consists of four towers with 40-foot-thick walls extending upward 144 feet above ground level. The structure was topped by a crane with a 135-foot boom. With the boom in the upright position, the stand was given an overall height of 405 feet, placing it among the highest structures in Alabama at the time. In this photo, taken June 24, 1963, the four tower legs of the test stand can be seen at their maximum height.

  20. Around Marshall

    NASA Image and Video Library

    1961-07-31

    At its founding, the Marshall Space Flight Center (MSFC) inherited the Army’s Jupiter and Redstone test stands, but much larger facilities were needed for the giant stages of the Saturn V. From 1960 to 1964, the existing stands were remodeled and a sizable new test area was developed. The new comprehensive test complex for propulsion and structural dynamics was unique within the nation and the free world, and they remain so today because they were constructed with foresight to meet the future as well as on going needs. Construction of the S-IC Static test stand complex began in 1961 in the west test area of MSFC, and was completed in 1964. The S-IC static test stand was designed to develop and test the 138-ft long and 33-ft diameter Saturn V S-IC first stage, or booster stage, weighing in at 280,000 pounds. Required to hold down the brute force of a 7,500,000-pound thrust produced by 5 F-1 engines, the S-IC static test stand was designed and constructed with the strength of hundreds of tons of steel and 12,000,000 pounds of cement, planted down to bedrock 40 feet below ground level. The foundation walls, constructed with concrete and steel, are 4 feet thick. The base structure consists of four towers with 40-foot-thick walls extending upward 144 feet above ground level. The structure was topped by a crane with a 135-foot boom. With the boom in the upright position, the stand was given an overall height of 405 feet, placing it among the highest structures in Alabama at the time. In this photo, taken July 31, 1961, work is continued in the clearing of the test stand site.

  1. Around Marshall

    NASA Image and Video Library

    1963-02-25

    At its founding, the Marshall Space Flight Center (MSFC) inherited the Army’s Jupiter and Redstone test stands, but much larger facilities were needed for the giant stages of the Saturn V. From 1960 to 1964, the existing stands were remodeled and a sizable new test area was developed. The new comprehensive test complex for propulsion and structural dynamics was unique within the nation and the free world, and they remain so today because they were constructed with foresight to meet the future as well as on going needs. Construction of the S-IC Static test stand complex began in 1961 in the west test area of MSFC, and was completed in 1964. The S-IC static test stand was designed to develop and test the 138-ft long and 33-ft diameter Saturn V S-IC first stage, or booster stage, weighing in at 280,000 pounds. Required to hold down the brute force of a 7,500,000-pound thrust produced by 5 F-1 engines, the S-IC static test stand was designed and constructed with the strength of hundreds of tons of steel and 12,000,000 pounds of cement, planted down to bedrock 40 feet below ground level. The foundation walls, constructed with concrete and steel, are 4 feet thick. The base structure consists of four towers with 40-foot-thick walls extending upward 144 feet above ground level. The structure was topped by a crane with a 135-foot boom. With the boom in the upright position, the stand was given an overall height of 405 feet, placing it among the highest structures in Alabama at the time. This photograph taken February 25, 1963, gives a close up look at two of the ever-growing four towers of the S-IC Test Stand.

  2. Around Marshall

    NASA Image and Video Library

    1963-05-07

    At its founding, the Marshall Space Flight Center (MSFC) inherited the Army’s Jupiter and Redstone test stands, but much larger facilities were needed for the giant stages of the Saturn V. From 1960 to 1964, the existing stands were remodeled and a sizable new test area was developed. The new comprehensive test complex for propulsion and structural dynamics was unique within the nation and the free world, and they remain so today because they were constructed with foresight to meet the future as well as on going needs. Construction of the S-IC Static test stand complex began in 1961 in the west test area of MSFC, and was completed in 1964. The S-IC static test stand was designed to develop and test the 138-ft long and 33-ft diameter Saturn V S-IC first stage, or booster stage, weighing in at 280,000 pounds. Required to hold down the brute force of a 7,500,000-pound thrust produced by 5 F-1 engines, the S-IC static test stand was designed and constructed with the strength of hundreds of tons of steel and 12,000,000 pounds of cement, planted down to bedrock 40 feet below ground level. The foundation walls, constructed with concrete and steel, are 4 feet thick. The base structure consists of four towers with 40-foot-thick walls extending upward 144 feet above ground level. The structure was topped by a crane with a 135-foot boom. With the boom in the upright position, the stand was given an overall height of 405 feet, placing it among the highest structures in Alabama at the time. This photograph, taken from ground level on May 7, 1963, gives a close look at one of the four towers legs of the S-IC test stand nearing its completed height.

  3. Around Marshall

    NASA Image and Video Library

    1963-05-07

    At its founding, the Marshall Space Flight Center (MSFC) inherited the Army’s Jupiter and Redstone test stands, but much larger facilities were needed for the giant stages of the Saturn V. From 1960 to 1964, the existing stands were remodeled and a sizable new test area was developed. The new comprehensive test complex for propulsion and structural dynamics was unique within the nation and the free world, and they remain so today because they were constructed with foresight to meet the future as well as on going needs. Construction of the S-IC Static test stand complex began in 1961 in the west test area of MSFC, and was completed in 1964. The S-IC static test stand was designed to develop and test the 138-ft long and 33-ft diameter Saturn V S-IC first stage, or booster stage, weighing in at 280,000 pounds. Required to hold down the brute force of a 7,500,000-pound thrust produced by 5 F-1 engines, the S-IC static test stand was designed and constructed with the strength of hundreds of tons of steel and 12,000,000 pounds of cement, planted down to bedrock 40 feet below ground level. The foundation walls, constructed with concrete and steel, are 4 feet thick. The base structure consists of four towers with 40-foot-thick walls extending upward 144 feet above ground level. The structure was topped by a crane with a 135-foot boom. With the boom in the upright position, the stand was given an overall height of 405 feet, placing it among the highest structures in Alabama at the time. This photograph, taken May 7, 1963, gives a close look at the four concrete tower legs of the S-IC test stand at their completed height.

  4. Around Marshall

    NASA Image and Video Library

    1961-07-21

    At its founding, the Marshall Space Flight Center (MSFC) inherited the Army’s Jupiter and Redstone test stands, but much larger facilities were needed for the giant stages of the Saturn V. From 1960 to 1964, the existing stands were remodeled and a sizable new test area was developed. The new comprehensive test complex for propulsion and structural dynamics was unique within the nation and the free world, and they remain so today because they were constructed with foresight to meet the future as well as on going needs. Construction of the S-IC Static test stand complex began in 1961 in the west test area of MSFC, and was completed in 1964. The S-IC static test stand was designed to develop and test the 138-ft long and 33-ft diameter Saturn V S-IC first stage, or booster stage, weighing in at 280,000 pounds. Required to hold down the brute force of a 7,500,000-pound thrust produced by 5 F-1 engines, the S-IC static test stand was designed and constructed with the strength of hundreds of tons of steel and 12,000,000 pounds of cement, planted down to bedrock 40 feet below ground level. The foundation walls, constructed with concrete and steel, are 4 feet thick. The base structure consists of four towers with 40-foot-thick walls extending upward 144 feet above ground level. The structure was topped by a crane with a 135-foot boom. With the boom in the upright position, the stand was given an overall height of 405 feet, placing it among the highest structures in Alabama at the time. In this photo, taken July 21, 1961, workers can be seen inside the test stand work area clearing the site.

  5. Around Marshall

    NASA Image and Video Library

    1963-10-10

    At its founding, the Marshall Space Flight Center (MSFC) inherited the Army’s Jupiter and Redstone test stands, but much larger facilities were needed for the giant stages of the Saturn V. From 1960 to 1964, the existing stands were remodeled and a sizable new test area was developed. The new comprehensive test complex for propulsion and structural dynamics was unique within the nation and the free world, and they remain so today because they were constructed with foresight to meet the future as well as on going needs. Construction of the S-IC Static test stand complex began in 1961 in the west test area of MSFC, and was completed in 1964. The S-IC static test stand was designed to develop and test the 138-ft long and 33-ft diameter Saturn V S-IC first stage, or booster stage, weighing in at 280,000 pounds. Required to hold down the brute force of a 7,500,000-pound thrust produced by 5 F-1 engines, the S-IC static test stand was designed and constructed with the strength of hundreds of tons of steel and 12,000,000 pounds of cement, planted down to bedrock 40 feet below ground level. The foundation walls, constructed with concrete and steel, are 4 feet thick. The base structure consists of four towers with 40-foot-thick walls extending upward 144 feet above ground level. The structure was topped by a crane with a 135-foot boom. With the boom in the upright position, the stand was given an overall height of 405 feet, placing it among the highest structures in Alabama at the time. This photo shows the progress of the S-IC test stand as of October 10, 1963. Kerosene storage tanks can be seen to the left.

  6. Around Marshall

    NASA Image and Video Library

    1961-07-10

    At its founding, the Marshall Space Flight Center (MSFC) inherited the Army’s Jupiter and Redstone test stands, but much larger facilities were needed for the giant stages of the Saturn V. From 1960 to 1964, the existing stands were remodeled and a sizable new test area was developed. The new comprehensive test complex for propulsion and structural dynamics was unique within the nation and the free world, and they remain so today because they were constructed with foresight to meet the future as well as on going needs. Construction of the S-IC Static test stand complex began in 1961 in the west test area of MSFC, and was completed in 1964. The S-IC static test stand was designed to develop and test the 138-ft long and 33-ft diameter Saturn V S-IC first stage, or booster stage, weighing in at 280,000 pounds. Required to hold down the brute force of a 7,500,000-pound thrust produced by 5 F-1 engines, the S-IC static test stand was designed and constructed with the strength of hundreds of tons of steel and 12,000,000 pounds of cement, planted down to bedrock 40 feet below ground level. The foundation walls, constructed with concrete and steel, are 4 feet thick. The base structure consists of four towers with 40-foot-thick walls extending upward 144 feet above ground level. The structure was topped by a crane with a 135-foot boom. With the boom in the upright position, the stand was given an overall height of 405 feet, placing it among the highest structures in Alabama at the time. In this photo, taken July 10, 1961, actual ground breaking has occurred for the S-IC test stand site.

  7. Advanced very high resolution radiometer

    NASA Technical Reports Server (NTRS)

    1976-01-01

    The advanced very high resolution radiometer development program is considered. The program covered the design, construction, and test of a breadboard model, engineering model, protoflight model, mechanical structural model, and a life test model. Special bench test and calibration equipment was also developed for use on the program.

  8. 33 CFR 159.119 - Operability test; temperature range.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 33 Navigation and Navigable Waters 2 2011-07-01 2011-07-01 false Operability test; temperature range. 159.119 Section 159.119 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) POLLUTION MARINE SANITATION DEVICES Design, Construction, and Testing § 159.119...

  9. Design and construction of a prototype ACTS propagation terminal

    NASA Technical Reports Server (NTRS)

    Stutzman, Warren; Pratt, Tim; Nunnally, Charles; Nealy, Randall; Remaklus, Will; Sylvester, Bill; Predoehl, Andrew; Gaff, Doug

    1993-01-01

    The launch schedule for the Advanced Communication Technology Satellite (ACTS) spacecraft did not leave sufficient time for completion of the prototype ACTS Propagation Terminals (APT) prior to initiation of the APT production phase. In fact, the approach used was to construct and test all subassemblies of the terminal with special emphasis on the technically challenging portions. These include the RF front end that uses a state-of-the-art down converter which integrates a low noise amplifier, mixer, post amplifier, filter, and local oscillator port frequency doubler into a single small package. In addition, a new digital receiver that uses the latest DSP technology was developed. Both of these subassemblies were thoroughly tested. The highest risk technology in the APT program was the digital receiver. Several candidate algorithms and DSP chips were investigated early on, primarily under JPL sponsorship. A receiver was constructed based on Texas Instruments chip. The final prototype digital receiver was one based on an Analog Devices chip. The design and test results are documented in a report prepared for this grant. A Primary Design Review (PDR) was conducted 30 May 1991, and a Critical Design Review was held 7 Jul. 1992. Final complete documentation of the APT's will appear in the form of three reports: a hardware description report, a report on the data collection code (ACTS VIEW), and a report on the preprocessing code.

  10. The GlueX central drift chamber: Design and performance

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Van Haarlem, Y; Barbosa, F; Dey, B

    2010-10-01

    Tests and studies concerning the design and performance of the GlueX Central Drift Chamber (CDC) are presented. A full-scale prototype was built to test and steer the mechanical and electronic design. Small scale prototypes were constructed to test for sagging and to do timing and resolution studies of the detector. These studies were used to choose the gas mixture and to program a Monte Carlo simulation that can predict the detector response in an external magnetic field. Particle identification and charge division possibilities were also investigated.

  11. Moments of Inertia

    DTIC Science & Technology

    2017-08-03

    Army Test and Evaluation Command 2202 Aberdeen Boulevard Aberdeen Proving Ground, MD 21005-5001 10. SPONSOR/MONITOR’S ACRONYM(S) 11. SPONSOR...properties that provide information on a vehicle’s mass distribution. The properties impact vehicle design and safety and are primary inputs to vehicle...also useful in the design and construction of vehicle safety outriggers needed during the conduct of dynamic handling tests. This document

  12. Design, construction and load testing of the bridge on Arnault Branch, Washington County, Missouri using innovative technologies.

    DOT National Transportation Integrated Search

    2010-02-01

    The superstructure and instrumentation designs of a three-span bridge are presented in this report. The three spans include a : precast box-girder bridge, a precast deck on steel girder and a precast deck on concrete girder. They were designed to com...

  13. 49 CFR 173.411 - Industrial packages.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ...) Each Type IP-1 package must meet the general design requirements prescribed in § 173.410. (2) Each Type IP-2 package must meet the general design requirements prescribed in § 173.410 and when subjected to...), “Requirements for the Design, Construction, Inspection and Testing of Portable Tanks and Multiple-Element Gas...

  14. Design and Performance Frameworks for Constructing Problem-Solving Simulations

    ERIC Educational Resources Information Center

    Stevens, Rons; Palacio-Cayetano, Joycelin

    2003-01-01

    Rapid advancements in hardware, software, and connectivity are helping to shorten the times needed to develop computer simulations for science education. These advancements, however, have not been accompanied by corresponding theories of how best to design and use these technologies for teaching, learning, and testing. Such design frameworks…

  15. Wavelet analysis to decompose a vibration simulation signal to improve pre-distribution testing of packaging

    NASA Astrophysics Data System (ADS)

    Griffiths, K. R.; Hicks, B. J.; Keogh, P. S.; Shires, D.

    2016-08-01

    In general, vehicle vibration is non-stationary and has a non-Gaussian probability distribution; yet existing testing methods for packaging design employ Gaussian distributions to represent vibration induced by road profiles. This frequently results in over-testing and/or over-design of the packaging to meet a specification and correspondingly leads to wasteful packaging and product waste, which represent 15bn per year in the USA and €3bn per year in the EU. The purpose of the paper is to enable a measured non-stationary acceleration signal to be replaced by a constructed signal that includes as far as possible any non-stationary characteristics from the original signal. The constructed signal consists of a concatenation of decomposed shorter duration signals, each having its own kurtosis level. Wavelet analysis is used for the decomposition process into inner and outlier signal components. The constructed signal has a similar PSD to the original signal, without incurring excessive acceleration levels. This allows an improved and more representative simulated input signal to be generated that can be used on the current generation of shaker tables. The wavelet decomposition method is also demonstrated experimentally through two correlation studies. It is shown that significant improvements over current international standards for packaging testing are achievable; hence the potential for more efficient packaging system design is possible.

  16. The influence of prototype testing in three-dimensional aortic models on fenestrated endograft design.

    PubMed

    Taher, Fadi; Falkensammer, Juergen; McCarte, Jamie; Strassegger, Johann; Uhlmann, Miriam; Schuch, Philipp; Assadian, Afshin

    2017-06-01

    The fenestrated Anaconda endograft (Vascutek/Terumo, Inchinnan, UK) is intended for the treatment of abdominal aortic aneurysms with an insufficient infrarenal landing zone. The endografts are custom-made with use of high-resolution, 1-mm-slice computed tomography angiography images. For every case, a nonsterile prototype and a three-dimensional (3D) model of the patient's aorta are constructed to allow the engineers as well as the physician to test-implant the device and to review the fit of the graft. The aim of this investigation was to assess the impact of 3D model construction and prototype testing on the design of the final sterile endograft. A prospectively held database on fenestrated endovascular aortic repair patients treated at a single institution was completed with data from the Vascutek engineers' prototype test results as well as the product request forms. Changes to endograft design based on prototype testing were assessed and are reported for all procedures. Between April 1, 2013, and August 18, 2015, 60 fenestrated Anaconda devices were implanted. Through prototype testing, engineers were able to identify and report potential risks to technical success related to use of the custom device for the respective patient. Theoretical concerns about endograft fit in the rigid model were expressed in 51 cases (85.0%), and the engineers suggested potential changes to the design of 21 grafts (35.0%). Thirteen cases (21.7%) were eventually modified after the surgeon's testing of the prototype. A second prototype was ordered in three cases (5.0%) because of extensive changes to endograft design, such as inclusion of an additional fenestration. Technical success rates were comparable for grafts that showed a perfect fit from the beginning and cases in which prototype testing resulted in a modification of graft design. Planning and construction of fenestrated endografts for complex aortic anatomies where exact fit and positioning of the graft are paramount to allow cannulation of the aortic branches are challenging. In the current series, approximately one in five endografts was modified after prototype testing in an aortic model. Eventually, success rates were comparable between the groups of patients with a good primary prototype fit and those in which the endograft design was altered. Prototype testing in 3D aortic models is a valuable tool to test the fit of a custom-made endograft before implantation. This may help avoid potentially debilitating adverse events associated with misaligned fenestrations and unconnected aortic branches. Copyright © 2016 Society for Vascular Surgery. Published by Elsevier Inc. All rights reserved.

  17. Program user's manual: cryogen system for the analysis for the Mirror Fusion Test Facility

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1979-04-01

    The Mirror Fusion Test Facility being designed and constructed at the Lawrence Livermore Laboratory requires a liquid helium liquefaction, storage, distribution, and recovery system and a liquid nitrogen storage and distribution system. To provide a powerful analytical tool to aid in the design evolution of this system through hardware, a thermodynamic fluid flow model was developed. This model allows the Lawrence Livermore Laboratory to verify that the design meets desired goals and to play what if games during the design evolution. For example, what if the helium flow rate is changed in the magnet liquid helium flow loop; how doesmore » this affect the temperature, fluid quality, and pressure. This manual provides all the information required to run all or portions of this program as desired. In addition, the program is constructed in a modular fashion so changes or modifications can be made easily to keep up with the evolving design.« less

  18. Process of constructing a lightweight x-ray flight mirror assembly

    NASA Astrophysics Data System (ADS)

    McClelland, Ryan S.; Biskach, Michael P.; Chan, Kai-Wing; Espina, Rebecca A.; Hohl, Bruce R.; Saha, Timo T.; Zhang, William W.

    2014-07-01

    Lightweight and high resolution optics are needed for future space-based x-ray telescopes to achieve advances in highenergy astrophysics. NASA's Next Generation X-ray Optics (NGXO) project has made significant progress towards building such optics, both in terms of maturing the technology for spaceflight readiness and improving the angular resolution. Technology Development Modules (TDMs) holding three pairs of mirrors have been regularly and repeatedly integrated and tested both for optical performance and mechanical strength. X-ray test results have been improved over the past year from 10.3 arc-seconds Half Power Diameter (HPD) to 8.3 arc-seconds HPD. A vibration test has been completed to NASA standard verification levels showing the optics can survive launch and pointing towards improvements in strengthening the modules through redundant bonds. A Finite Element Analysis (FEA) study was completed which shows the mirror distortion caused by bonding is insensitive to the number of bonds. Next generation TDMs, which will demonstrate a lightweight structure and mount additional pairs of mirrors, have been designed and fabricated. The light weight of the module structure is achieved through the use of E-60 Beryllium Oxide metal matrix composite material. As the angular resolution of the development modules has improved, gravity distortion during horizontal x-ray testing has become a limiting factor. To address this issue, a facility capable of testing in the vertical orientation has been designed and planned. Test boring at the construction site suggest standard caisson construction methods can be utilized to install a subterranean vertical vacuum pipe. This facility will also allow for the testing of kinematically mounted mirror segments, which greatly reduces the effect of bonding displacements. A development platform demonstrating the feasibility of kinematically mounting mirror segments has been designed, fabricated, and successfully tested.

  19. Cell module and fuel conditioner

    NASA Technical Reports Server (NTRS)

    Hoover, D. Q., Jr.

    1980-01-01

    Measurements of stack height changes with temperature and cell material characteristics were made. Stack 559 was assembled and components were fabricated for 560, 561, and 562. Stack 425 was transferred from the parallel DOE program and installed in the OS/IES simulation loop for mechanical and electrical testing. Construction and preliminary checkout of the 2 kW test facility was completed and design and procurement of the 8 kW test facility was initiated. The fuel conditioning subsystem design continued to evolve and the state points for the current design were calculated at full and part load conditions. Steam reforming catalyst activity tests were essentially completed and aging tests and CO shift converter tests were initiated.

  20. Around Marshall

    NASA Image and Video Library

    1962-04-16

    At its founding, the Marshall Space Flight Center (MSFC) inherited the Army’s Jupiter and Redstone test stands, but much larger facilities were needed for the giant stages of the Saturn V. From 1960 to 1964, the existing stands were remodeled and a sizable new test area was developed. The new comprehensive test complex for propulsion and structural dynamics was unique within the nation and the free world, and they remain so today because they were constructed with foresight to meet the future as well as on going needs. Construction of the S-IC Static test stand complex began in 1961 in the west test area of MSFC, and was completed in 1964. The S-IC static test stand was designed to develop and test the 138-ft long and 33-ft diameter Saturn V S-IC first stage, or booster stage, weighing in at 280,000 pounds. Required to hold down the brute force of a 7,500,000-pound thrust produced by 5 F-1 engines, the S-IC static test stand was designed and constructed with the strength of hundreds of tons of steel and 12,000,000 pounds of cement, planted down to bedrock 40 feet below ground level. The foundation walls, constructed with concrete and steel, are 4 feet thick. The base structure consists of four towers with 40-foot-thick walls extending upward 144 feet above ground level. The structure was topped by a crane with a 135-foot boom. With the boom in the upright position, the stand was given an overall height of 405 feet, placing it among the highest structures in Alabama at the time. After a 6 month delay in construction due to size reconfiguration of the Saturn booster, the site was revisited for modifications. The original foundation walls built in the prior year had to be torn down and re-poured to accommodate the larger booster. The demolition can be seen in this photograph taken on April 16, 1962.

  1. Around Marshall

    NASA Image and Video Library

    1962-06-13

    At its founding, the Marshall Space Flight Center (MSFC) inherited the Army’s Jupiter and Redstone test stands, but much larger facilities were needed for the giant stages of the Saturn V. From 1960 to 1964, the existing stands were remodeled and a sizable new test area was developed. The new comprehensive test complex for propulsion and structural dynamics was unique within the nation and the free world, and they remain so today because they were constructed with foresight to meet the future as well as on going needs. Construction of the S-IC Static test stand complex began in 1961 in the west test area of MSFC, and was completed in 1964. The S-IC static test stand was designed to develop and test the 138-ft long and 33-ft diameter Saturn V S-IC first stage, or booster stage, weighing in at 280,000 pounds. Required to hold down the brute force of a 7,500,000-pound thrust produced by 5 F-1 engines, the S-IC static test stand was designed and constructed with the strength of hundreds of tons of steel and 12,000,000 pounds of cement, planted down to bedrock 40 feet below ground level. The foundation walls, constructed with concrete and steel, are 4 feet thick. The base structure consists of four towers with 40-foot-thick walls extending upward 144 feet above ground level. The structure was topped by a crane with a 135-foot boom. With the boom in the upright position, the stand was given an overall height of 405 feet, placing it among the highest structures in Alabama at the time. After a six month delay in construction due to size reconfiguration of the Saturn booster, the site was revisited for modifications in March 1962. The original foundation walls built in the prior year were torn down and re-poured to accommodate the larger boosters. This photo depicts that modification progress as of June 13,1962.

  2. Around Marshall

    NASA Image and Video Library

    1962-05-21

    At its founding, the Marshall Space Flight Center (MSFC) inherited the Army’s Jupiter and Redstone test stands, but much larger facilities were needed for the giant stages of the Saturn V. From 1960 to 1964, the existing stands were remodeled and a sizable new test area was developed. The new comprehensive test complex for propulsion and structural dynamics was unique within the nation and the free world, and they remain so today because they were constructed with foresight to meet the future as well as on going needs. Construction of the S-IC Static test stand complex began in 1961 in the west test area of MSFC, and was completed in 1964. The S-IC static test stand was designed to develop and test the 138-ft long and 33-ft diameter Saturn V S-IC first stage, or booster stage, weighing in at 280,000 pounds. Required to hold down the brute force of a 7,500,000-pound thrust produced by 5 F-1 engines, the S-IC static test stand was designed and constructed with the strength of hundreds of tons of steel and 12,000,000 pounds of cement, planted down to bedrock 40 feet below ground level. The foundation walls, constructed with concrete and steel, are 4 feet thick. The base structure consists of four towers with 40-foot-thick walls extending upward 144 feet above ground level. The structure was topped by a crane with a 135-foot boom. With the boom in the upright position, the stand was given an overall height of 405 feet, placing it among the highest structures in Alabama at the time. After a 6 month delay in construction due to size reconfiguration of the Saturn booster, the site was revisited for modifications. The original foundation walls built in the prior year had to be torn down and re-poured to accommodate the larger booster. The demolition can be seen in this photograph taken on May 21, 1962.

  3. Around Marshall

    NASA Image and Video Library

    1961-09-05

    At its founding, the Marshall Space Flight Center (MSFC) inherited the Army’s Jupiter and Redstone test stands, but much larger facilities were needed for the giant stages of the Saturn V. From 1960 to 1964, the existing stands were remodeled and a sizable new test area was developed. The new comprehensive test complex for propulsion and structural dynamics was unique within the nation and the free world, and they remain so today because they were constructed with foresight to meet the future as well as on going needs. Construction of the S-IC Static test stand complex began in 1961 in the west test area of MSFC, and was completed in 1964. The S-IC static test stand was designed to develop and test the 138-ft long and 33-ft diameter Saturn V S-IC first stage, or booster stage, weighing in at 280,000 pounds. Required to hold down the brute force of a 7,500,000-pound thrust produced by 5 F-1 engines, the S-IC static test stand was designed and constructed with the strength of hundreds of tons of steel and 12,000,000 pounds of cement, planted down to bedrock 40 feet below ground level. The foundation walls, constructed with concrete and steel, are 4 feet thick. The base structure consists of four towers with 40-foot-thick walls extending upward 144 feet above ground level. The structure was topped by a crane with a 135-foot boom. With the boom in the upright position, the stand was given an overall height of 405 feet, placing it among the highest structures in Alabama at the time. This photo, taken September 5, 1961, shows the construction of forms which became the concrete foundation for the massive stand. The lower right hand corner reveals a pump used for extracting water emerging from a disturbed natural spring that occurred during excavation of the site. The pumping became a daily ritual and the site is still pumped today.

  4. Design and construction of a remote piloted flying wing. B.S. Thesis

    NASA Technical Reports Server (NTRS)

    Costa, Alfred J.; Koopman, Fritz; Soboleski, Craig; Trieu, Thai-Ba; Duquette, Jaime; Krause, Scott; Susko, David; Trieu, Thuyba

    1994-01-01

    Currently, there is a need for a high-speed, high-lift civilian transport. Although unconventional, a flying wing could fly at speeds in excess of Mach 2 and still retain the capacity of a 747. The design of the flying wing is inherently unstable since it lacks a fuselage and a horizontal tail. The project goal was to design, construct, fly, and test a remote-piloted scale model flying wing. The project was completed as part of the NASA/USRA Advanced Aeronautics Design Program. These unique restrictions required us to implement several fundamental design changes from last year's Elang configuration including wing sweepback and wingtip endplates. Unique features such as a single ducted fan engine, composite structural materials, and an electrostatic stability system were incorporated. The result is the Banshee '94. Our efforts will aid future projects in design and construction techniques so that a viable flying wing can become an integral part of the aviation industry.

  5. A polymer driveshaft for use in orbital and rotational atherectomy

    NASA Astrophysics Data System (ADS)

    Grothe, Preston Lee

    Driveshafts used in atherectomy medical devices are often comprised of coiled or braided metal wires. These constructions are designed to tolerate delivery through tortuous vessels and can endure high speed rotation used during activation of the atherectomy treatment. This research investigated polymer driveshaft designs, which were comprised of polymer inner and outer layers, and coiled or braided stainless steel wires. The polymer driveshaft materials included polyimide, nylon 12, and polytetrafluoroethylene (PTFE). Mechanical testing of polymer driveshafts was conducted to determine material response in bending, tension, compression, and torsion. The polymer driveshaft test results were then compared with current coiled metal wire driveshaft constructions. The investigation identified polymer driveshaft options that could feasibly work in an atherectomy application.

  6. Aerodynamic design of the Cal Poly Da Vinci Human-Powered Helicopter

    NASA Technical Reports Server (NTRS)

    Larwood, Scott; Saiki, Neal

    1990-01-01

    This paper will discuss the methodology used in designing the rotor and drive propellers for the third generation Cal Poly Da Vinci Human-Powered Helicopter. The rotor was designed using a lifting surface, uniform inflow hover analysis code and the propeller was designed using a minimum induced-loss method. Construction, geometry, and operating considerations are discussed as they impact the designs. Optimization of the design performance is also explained. The propellers were tested in a wind tunnel and results are compared with theoretical data. Successful flight tests of the Da Vinci III are discussed.

  7. A stab in the dark: Design and construction of a novel device for conducting incised knife trauma investigations and its initial test.

    PubMed

    Humphrey, Caitlin; Kumaratilake, Jaliya; Henneberg, Maciej

    2016-05-01

    Knife attacks are commonly seen in Australia and other countries. During forensic investigations the force with which a wound was inflicted is often questioned. The ability to examine resultant trauma and particular weapons at different forces with an experimental device may lead to better interpretations of knife wounds. The objective of this study is to design, construct and test a device to analyse the characteristics and forces involved in knife attacks, particularly incised wounds. The mechanical variables (e.g. force, angle, knife geometry) involved in knife attacks have been considered to design and construct a suitable device which allows these variables to be systematically controlled and varied. A device was designed and constructed from mild steel. This included a pivoting arm and instrumented knife holder. The arm has adjustable angle and weight so that knives can be operated at different calculated forces. A device was successfully constructed and the repeatability of incised knife trauma and its characteristics in skeletal tissues were investigated. A device which allows reproducible and controlled experiments with knife wounds will be advantageous to forensic investigations. In particular, in determining forces and types of weapons associated with particular wounds, identifying or eliminating suspected weapons and more accurately answering the common question: How much force would be required to cause that particular wound. This could help to characterise the perpetrator. The device can be altered to be used in the future to investigate trauma caused by other weapons. Copyright © 2016 Elsevier Ireland Ltd. All rights reserved.

  8. Design, testing and emplacement of sand-bentonite for the construction of a gas-permeable seal test (gast)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Teodori, Sven-Peter; Ruedi, Jorg; Reinhold, Matthias

    2013-07-01

    The main aim of a gas-permeable seal is to increase the gas transport capacity of the backfilled underground structures without compromising the radionuclide retention capacity of the engineered barrier system or the host rock. Such a seal, proposed by NAGRA as part of the 'Engineered Gas Transport System' in a L/ILW repository, considers specially designed backfill and sealing materials such as sand/bentonite (S/B) mixtures with a bentonite content of 20- 30%. NAGRA's RD and D plan foresees demonstrating the construction and performance of repository seals and improving the understanding and the database for reliably predicting water and gas transport throughmore » these systems. The fluid flow and gas transport properties of these backfills have been determined at the laboratory scale and through modelling the maximum gas pressures in the near field of a repository system and the gas flow rates have been evaluated. Within this context, the Gas-permeable Seal Test (GAST) was constructed at Grimsel Test Site (GTS) to validate the effective functioning of gas-permeable seals at realistic scale. The intrinsic permeability of such seals should be in the order of 10-18 m2. Because the construction of S/B seals is not common practice for construction companies, a stepwise approach was followed to evaluate different construction and quality assurance methods. As a first step, an investigation campaign with simple tests in the laboratory and in the field followed by 1:1 scale pre-tests at GTS was performed. Through this gradual increase of the degree of complexity, practical experience was gained and confidence in the methods and procedures to be used was built, which allowed reliably producing and working with S/B mixtures at a realistic scale. During the whole pre-testing phase, a quality assurance (QA) programme for S/B mixtures was developed and different methods were assessed. They helped to evaluate and choose appropriate emplacement techniques and methodologies to achieve the target S/B dry density of 1.70 g/cm{sup 3}, which results in the desired intrinsic permeability throughout the experiment. The final QA methodology was targeted at engineering measures to decide if the work can proceed, and at producing high resolution material properties database for future water and gas transport modelling activities. The different applied QA techniques included standard core cutter tests, the application of neutron-gamma (Troxler) probes and two mass balance methods (2D and 3D). The methods, looking at different representative scales, have provided only slightly different results and showed that the average density of the emplaced S/B plug was between 1.65 and 1.73 g/cm{sup 3}. Spatial variability of dry densities was observed at decimeter scale. Overall, the pre-testing and QA programme performed for the GAST project demonstrated how the given design criteria and requirements can be met by appropriately planning and designing the material emplacement. (authors)« less

  9. An integrated theoretical-experimental approach to accelerate translational tissue engineering.

    PubMed

    Coy, Rachel H; Evans, Owen R; Phillips, James B; Shipley, Rebecca J

    2018-01-01

    Implantable devices utilizing bioengineered tissue are increasingly showing promise as viable clinical solutions. The design of bioengineered constructs is currently directed according to the results of experiments that are used to test a wide range of different combinations and spatial arrangements of biomaterials, cells and chemical factors. There is an outstanding need to accelerate the design process and reduce financial costs, whilst minimizing the required number of animal-based experiments. These aims could be achieved through the incorporation of mathematical modelling as a preliminary design tool. Here we focus on tissue-engineered constructs for peripheral nerve repair, which are designed to aid nerve and blood vessel growth and repair after peripheral nerve injury. We offer insight into the role that mathematical modelling can play within tissue engineering, and motivate the use of modelling as a tool capable of improving and accelerating the design of nerve repair constructs in particular. Specific case studies are presented in order to illustrate the potential of mathematical modelling to direct construct design. Copyright © 2016 The Authors Journal of Tissue Engineering and Regenerative Medicine Published by John Wiley & Sons Ltd. Copyright © 2016 The Authors Journal of Tissue Engineering and Regenerative Medicine Published by John Wiley & Sons Ltd.

  10. 76 FR 64977 - Agency Information Collection Activities: Submission for the Office of Management and Budget (OMB...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-19

    ... the NRC to assess the adequacy of proposed seismic design bases and the design bases for other site..., designed, constructed, and maintained to withstand geologic hazards, such as faulting, seismic hazards, and... potential man-made hazards will be appropriately accounted for in the design of nuclear power and test...

  11. Third generation design solar cell module LSA task 5, large scale production

    NASA Technical Reports Server (NTRS)

    1980-01-01

    A total of twelve (12) preproduction modules were constructed, tested, and delivered. A concept to the frame assembly was designed and proven to be quite reliable. This frame design, as well as the rest of the assembly, was designed with future high volume production and the use of automated equipment in mind.

  12. 46 CFR 154.449 - Model test.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ...-PROPELLED VESSELS CARRYING BULK LIQUEFIED GASES Design, Construction and Equipment Independent Tank Type B § 154.449 Model test. The following analyzed data of a model test of structural elements for independent tank type B must be submitted to the Commandant (CG-ENG) for special approval: (a) Stress concentration...

  13. Is Free Recall Active: The Testing Effect through the ICAP Lens

    ERIC Educational Resources Information Center

    Bruchok, Christiana; Mar, Christopher; Craig, Scotty D.

    2017-01-01

    Amidst evidence in favor of "active learning," online instruction widely implements passive design and tests learners' retrieval performance as opposed to learners' understanding. Literature reporting the testing effect promotes recall as a learning tool. The Interactive>Constructive>Active>Passive taxonomy would place quizzing…

  14. Test Design Considerations for Students with Significant Cognitive Disabilities

    ERIC Educational Resources Information Center

    Anderson, Daniel; Farley, Dan; Tindal, Gerald

    2015-01-01

    Students with significant cognitive disabilities present an assessment dilemma that centers on access and validity in large-scale testing programs. Typically, access is improved by eliminating construct-irrelevant barriers, while validity is improved, in part, through test standardization. In this article, one state's alternate assessment data…

  15. Slope Stability of Geosynthetic Clay Liner Test Plots

    EPA Science Inventory

    Fourteen full-scale field test plots containing five types of geosynthetic clay liners (GCLs) were constructed on 2H:IV and 3H:IV slopes for the purpose of assessing slope stability. The test plots were designed to simulate typical final cover systems for landfill. Slides occurr...

  16. 33 CFR 159.129 - Safety: Ignition prevention test.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 33 Navigation and Navigable Waters 2 2011-07-01 2011-07-01 false Safety: Ignition prevention test. 159.129 Section 159.129 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) POLLUTION MARINE SANITATION DEVICES Design, Construction, and Testing § 159.129 Safety: Ignition...

  17. 14 CFR 23.683 - Operation tests.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... STANDARDS: NORMAL, UTILITY, ACROBATIC, AND COMMUTER CATEGORY AIRPLANES Design and Construction Control Systems § 23.683 Operation tests. (a) It must be shown by operation tests that, when the controls are... controls, loads not less than those corresponding to the maximum pilot effort established under § 23.405...

  18. 14 CFR 29.683 - Operation tests.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... STANDARDS: TRANSPORT CATEGORY ROTORCRAFT Design and Construction Control Systems § 29.683 Operation tests. It must be shown by operation tests that, when the controls are operated from the pilot compartment with the control system loaded to correspond with loads specified for the system, the system is free...

  19. 14 CFR 23.683 - Operation tests.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... STANDARDS: NORMAL, UTILITY, ACROBATIC, AND COMMUTER CATEGORY AIRPLANES Design and Construction Control Systems § 23.683 Operation tests. (a) It must be shown by operation tests that, when the controls are... controls, loads not less than those corresponding to the maximum pilot effort established under § 23.405...

  20. 14 CFR 23.683 - Operation tests.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... STANDARDS: NORMAL, UTILITY, ACROBATIC, AND COMMUTER CATEGORY AIRPLANES Design and Construction Control Systems § 23.683 Operation tests. (a) It must be shown by operation tests that, when the controls are... controls, loads not less than those corresponding to the maximum pilot effort established under § 23.405...

  1. 14 CFR 23.683 - Operation tests.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... STANDARDS: NORMAL, UTILITY, ACROBATIC, AND COMMUTER CATEGORY AIRPLANES Design and Construction Control Systems § 23.683 Operation tests. (a) It must be shown by operation tests that, when the controls are... controls, loads not less than those corresponding to the maximum pilot effort established under § 23.405...

  2. 14 CFR 27.683 - Operation tests.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... STANDARDS: NORMAL CATEGORY ROTORCRAFT Design and Construction Control Systems § 27.683 Operation tests. It must be shown by operation tests that, when the controls are operated from the pilot compartment with the control system loaded to correspond with loads specified for the system, the system is free from...

  3. 14 CFR 23.683 - Operation tests.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... STANDARDS: NORMAL, UTILITY, ACROBATIC, AND COMMUTER CATEGORY AIRPLANES Design and Construction Control Systems § 23.683 Operation tests. (a) It must be shown by operation tests that, when the controls are... controls, loads not less than those corresponding to the maximum pilot effort established under § 23.405...

  4. Electronic and mechanical improvement of the receiving terminal of a free-space microwave power transmission system

    NASA Technical Reports Server (NTRS)

    Brown, W. C.

    1977-01-01

    Significant advancements were made in a number of areas: improved efficiency of basic receiving element at low power density levels, improved resolution and confidence in efficiency measurements mathematical modelling and computer simulation of the receiving element and the design, construction, and testing of an environmentally protected two-plane construction suitable for low cost, highly automated construction of large receiving arrays.

  5. Molecular Characterization of Wetland Soil Bacterial Community in Constructed Mesocosms

    DTIC Science & Technology

    2006-06-01

    promise. In order to better understand this process and test its legitimacy, a treatment wetland was constructed at Wright-Patterson AFB, Dayton, Ohio...fruition. Dr. Smith, without your patient instruction in the process of DNA extraction, PCR amplification, cloning, sequencing, and analysis those...then, wetlands have also been designed and constructed to treat process waters from industry (Kadlec and Knight, 1996) and are being used more and

  6. The Testing Behind the Test Facility: the Acoustic Design of the NASA Glenn Research Center's World-Class Reverberant Acoustic Test Facility

    NASA Technical Reports Server (NTRS)

    Hughes, William O.; McNelis, Mark E.; Hozman, Aron D.; McNelis, Anne M.

    2010-01-01

    The National Aeronautics and Space Administration (NASA) Glenn Research Center (GRC) is leading the design and build of the new world-class vibroacoustic test capabilities at the NASA GRC s Plum Brook Station in Sandusky, Ohio, U.S.A. Benham Companies, LLC is currently constructing modal, base-shake sine and reverberant acoustic test facilities to support the future testing needs of NASA s space exploration program. The large Reverberant Acoustic Test Facility (RATF) will be approximately 101,000 ft3 in volume and capable of achieving an empty chamber acoustic overall sound pressure level (OASPL) of 163 dB. This combination of size and acoustic power is unprecedented amongst the world s known active reverberant acoustic test facilities. The key to achieving the expected acoustic test spectra for a range of many NASA space flight environments in the RATF is the knowledge gained from a series of ground acoustic tests. Data was obtained from several NASA-sponsored test programs, including testing performed at the National Research Council of Canada s acoustic test facility in Ottawa, Ontario, Canada, and at the Redstone Technical Test Center acoustic test facility in Huntsville, Alabama, U.S.A. The majority of these tests were performed to characterize the acoustic performance of the modulators (noise generators) and representative horns that would be required to meet the desired spectra, as well as to evaluate possible supplemental gas jet noise sources. The knowledge obtained in each of these test programs enabled the design of the RATF sound generation system to confidently advance to its final acoustic design and subsequent ongoing construction.

  7. The Testing Behind The Test Facility: The Acoustic Design of the NASA Glenn Research Center's World-Class Reverberant Acoustic Test Facility

    NASA Technical Reports Server (NTRS)

    Hughes, William O.; McNelis, Mark E.; McNelis, Anne M.

    2011-01-01

    The National Aeronautics and Space Administration (NASA) Glenn Research Center (GRC) is leading the design and build of the new world-class vibroacoustic test capabilities at the NASA GRC?s Plum Brook Station in Sandusky, Ohio, USA. Benham Companies, LLC is currently constructing modal, base-shake sine and reverberant acoustic test facilities to support the future testing needs of NASA?s space exploration program. T he large Reverberant Acoustic Test Facility (RATF) will be approximately 101,000 ft3 in volume and capable of achieving an empty chamber acoustic overall sound pressure level (OASPL) of 163 dB. This combination of size and acoustic power is unprecedented amongst the world?s known active reverberant acoustic test facilities. The key to achieving the expected acoustic test spectra for a range of many NASA space flight environments in the RATF is the knowledge gained from a series of ground acoustic tests. Data was obtained from several NASA-sponsored test programs, including testing performed at the National Research Council of Canada?s acoustic test facility in Ottawa, Ontario, Canada, and at the Redstone Technical Test Center acoustic test facility in Huntsville, Alabama, USA. The majority of these tests were performed to characterize the acoustic performance of the modulators (noise generators) and representative horns that would be required to meet the desired spectra, as well as to evaluate possible supplemental gas jet noise sources. The knowledge obtained in each of these test programs enabled the design of the RATF sound generation system to confidently advance to its final acoustic de-sign and subsequent on-going construction.

  8. Evaluating Equating Results in the Non-Equivalent Groups with Anchor Test Design Using Equipercentile and Equity Criteria

    ERIC Educational Resources Information Center

    Duong, Minh Quang

    2011-01-01

    Testing programs often use multiple test forms of the same test to control item exposure and to ensure test security. Although test forms are constructed to be as similar as possible, they often differ. Test equating techniques are those statistical methods used to adjust scores obtained on different test forms of the same test so that they are…

  9. Around Marshall

    NASA Image and Video Library

    1963-01-14

    At its founding, the Marshall Space Flight Center (MSFC) inherited the Army’s Jupiter and Redstone test stands, but much larger facilities were needed for the giant stages of the Saturn V. From 1960 to 1964, the existing stands were remodeled and a sizable new test area was developed. The new comprehensive test complex for propulsion and structural dynamics was unique within the nation and the free world, and they remain so today because they were constructed with foresight to meet the future as well as on going needs. Construction of the S-IC Static test stand complex began in 1961 in the west test area of MSFC, and was completed in 1964. The S-IC static test stand was designed to develop and test the 138-ft long and 33-ft diameter Saturn V S-IC first stage, or booster stage, weighing in at 280,000 pounds. Required to hold down the brute force of a 7,500,000-pound thrust produced by 5 F-1 engines, the S-IC static test stand was designed and constructed with the strength of hundreds of tons of steel and 12,000,000 pounds of cement, planted down to bedrock 40 feet below ground level. The foundation walls, constructed with concrete and steel, are 4 feet thick. The base structure consists of four towers with 40-foot-thick walls extending upward 144 feet above ground level. The structure was topped by a crane with a 135-foot boom. With the boom in the upright position, the stand was given an overall height of 405 feet, placing it among the highest structures in Alabama at the time. This photo, depicts the progress of the stand as of January 14, 1963, with its four towers prominently rising.

  10. Around Marshall

    NASA Image and Video Library

    1961-09-29

    At its founding, the Marshall Space Flight Center (MSFC) inherited the Army’s Jupiter and Redstone test stands, but much larger facilities were needed for the giant stages of the Saturn V. From 1960 to 1964, the existing stands were remodeled and a sizable new test area was developed. The new comprehensive test complex for propulsion and structural dynamics was unique within the nation and the free world, and they remain so today because they were constructed with foresight to meet the future as well as on going needs. Construction of the S-IC Static test stand complex began in 1961 in the west test area of MSFC, and was completed in 1964. The S-IC static test stand was designed to develop and test the 138-ft long and 33-ft diameter Saturn V S-IC first stage, or booster stage, weighing in at 280,000 pounds. Required to hold down the brute force of a 7,500,000-pound thrust produced by 5 F-1 engines, the S-IC static test stand was designed and constructed with the strength of hundreds of tons of steel and 12,000,000 pounds of cement, planted down to bedrock 40 feet below ground level. The foundation walls, constructed with concrete and steel, are 4 feet thick. The base structure consists of four towers with 40-foot-thick walls extending upward 144 feet above ground level. The structure was topped by a crane with a 135-foot boom. With the boom in the upright position, the stand was given an overall height of 405 feet, placing it among the highest structures in Alabama at the time. This photo, taken September 29, 1961, shows the progress of the concrete walls for the stand’s foundation. Some of the walls have been poured and some of the concrete forms have been removed.

  11. Around Marshall

    NASA Image and Video Library

    1961-09-15

    At its founding, the Marshall Space Flight Center (MSFC) inherited the Army’s Jupiter and Redstone test stands, but much larger facilities were needed for the giant stages of the Saturn V. From 1960 to 1964, the existing stands were remodeled and a sizable new test area was developed. The new comprehensive test complex for propulsion and structural dynamics was unique within the nation and the free world, and they remain so today because they were constructed with foresight to meet the future as well as on going needs. Construction of the S-IC Static test stand complex began in 1961 in the west test area of MSFC, and was completed in 1964. The S-IC static test stand was designed to develop and test the 138-ft long and 33-ft diameter Saturn V S-IC first stage, or booster stage, weighing in at 280,000 pounds. Required to hold down the brute force of a 7,500,000-pound thrust produced by 5 F-1 engines, the S-IC static test stand was designed and constructed with the strength of hundreds of tons of steel and 12,000,000 pounds of cement, planted down to bedrock 40 feet below ground level. The foundation walls, constructed with concrete and steel, are 4 feet thick. The base structure consists of four towers with 40-foot-thick walls extending upward 144 feet above ground level. The structure was topped by a crane with a 135-foot boom. With the boom in the upright position, the stand was given an overall height of 405 feet, placing it among the highest structures in Alabama at the time. This photo, taken September 15, 1961, shows the installation of the reinforcing steel prior to the pouring of the concrete foundation walls.

  12. Around Marshall

    NASA Image and Video Library

    1961-09-22

    At its founding, the Marshall Space Flight Center (MSFC) inherited the Army’s Jupiter and Redstone test stands, but much larger facilities were needed for the giant stages of the Saturn V. From 1960 to 1964, the existing stands were remodeled and a sizable new test area was developed. The new comprehensive test complex for propulsion and structural dynamics was unique within the nation and the free world, and they remain so today because they were constructed with foresight to meet the future as well as on going needs. Construction of the S-IC Static test stand complex began in 1961 in the west test area of MSFC, and was completed in 1964. The S-IC static test stand was designed to develop and test the 138-ft long and 33-ft diameter Saturn V S-IC first stage, or booster stage, weighing in at 280,000 pounds. Required to hold down the brute force of a 7,500,000-pound thrust produced by 5 F-1 engines, the S-IC static test stand was designed and constructed with the strength of hundreds of tons of steel and 12,000,000 pounds of cement, planted down to bedrock 40 feet below ground level. The foundation walls, constructed with concrete and steel, are 4 feet thick. The base structure consists of four towers with 40-foot-thick walls extending upward 144 feet above ground level. The structure was topped by a crane with a 135-foot boom. With the boom in the upright position, the stand was given an overall height of 405 feet, placing it among the highest structures in Alabama at the time. This photo, taken September 22, 1961, shows the progress of the concrete walls for the stand’s foundation. Some of the walls have been poured and some of the concrete forms have been removed.

  13. Qualification and Certification of 3D Printed Parts for Naval Ships

    DTIC Science & Technology

    2017-12-01

    advances in computer systems, power generators, missile capabilities and product construction, yet they rarely change how something is created, designed or...settings), but section 1.3 takes a look at what must be determined during the design process to ensure the best product can be created. As seen in Chapter...center as well as the printed products . 46 Figure 33. Test Block Design All test cubes were immediately labeled upon being removed from the

  14. Re-design and fabrication of titanium multi-wall Thermal Protection System (TPS) test panels

    NASA Technical Reports Server (NTRS)

    Blair, W.; Meaney, J. E., Jr.; Rosenthal, H. A.

    1984-01-01

    The Titanium Multi-wall Thermal Protection System (TIPS) panel was re-designed to incorporate Ti-6-2-4-2 outer sheets for the hot surface, ninety degree side closures for ease of construction and through panel fastness for ease of panel removal. Thermal and structural tests were performed to verify the design. Twenty-five panels were fabricated and delivered to NASA for evaluation at Langley Research Center and Johnson Space Center.

  15. Evaluation of pyrolysis and arc tracking on candidate wire insulation designs for space applications

    NASA Technical Reports Server (NTRS)

    Stueber, Thomas J.; Hrovat, Kenneth

    1994-01-01

    The ability of wire insulation materials and constructions to resist arc tracking was determined and the damage caused by initial arcing and restrike events was assessed. Results of arc tracking tests on various insulation constructions are presented in view-graph format. Arc tracking tests conducted on Champlain, Filotex, and Teledyne Thermatics indicate the Filotex is least likely to arc track. Arc tracking occurs more readily in air than it does in vacuum.

  16. Design, construction and mechanical optimisation process of electrode with radial current flow in the scala tympani.

    PubMed

    Deman, P R; Kaiser, T M; Dirckx, J J; Offeciers, F E; Peeters, S A

    2003-09-30

    A 48 contact cochlear implant electrode has been constructed for electrical stimulation of the auditory nerve. The stimulating contacts of this electrode are organised in two layers: 31 contacts on the upper surface directed towards the habenula perforata and 17 contacts connected together as one longitudinal contact on the underside. The design of the electrode carrier aims to make radial current flow possible in the cochlea. The mechanical structure of the newly designed electrode was optimised to obtain maximal insertion depth. Electrode insertion tests were performed in a transparent acrylic model of the human cochlea.

  17. Design and construction of portable survey meter

    NASA Astrophysics Data System (ADS)

    Singseeta, W.; Thong-aram, D.; Pencharee, S.

    2017-09-01

    This work was aimed to design and construction of portable survey meter for radiation dose measuring. The designed system consists of 4 main parts consisting of low voltage power supply, radiation detection, radiation measurement and data display part on android phone. The test results show that the ripple voltage of low voltage power supply is less than 1%, the maximum integral counts are found to be 104 counts per second and the maximum distance of wireless commination between the server and the client is about 10 meter. It was found that the developed system had small size and light weight for portable instrument.

  18. 33 CFR 159.115 - Temperature range test.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 33 Navigation and Navigable Waters 2 2014-07-01 2014-07-01 false Temperature range test. 159.115...) POLLUTION MARINE SANITATION DEVICES Design, Construction, and Testing § 159.115 Temperature range test. (a) The device must be held at a temperature of 60 °C or higher for a period of 16 hours. (b) The device...

  19. 33 CFR 159.115 - Temperature range test.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 33 Navigation and Navigable Waters 2 2013-07-01 2013-07-01 false Temperature range test. 159.115...) POLLUTION MARINE SANITATION DEVICES Design, Construction, and Testing § 159.115 Temperature range test. (a) The device must be held at a temperature of 60 °C or higher for a period of 16 hours. (b) The device...

  20. 33 CFR 159.115 - Temperature range test.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 33 Navigation and Navigable Waters 2 2012-07-01 2012-07-01 false Temperature range test. 159.115...) POLLUTION MARINE SANITATION DEVICES Design, Construction, and Testing § 159.115 Temperature range test. (a) The device must be held at a temperature of 60 °C or higher for a period of 16 hours. (b) The device...

  1. 33 CFR 159.115 - Temperature range test.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 33 Navigation and Navigable Waters 2 2010-07-01 2010-07-01 false Temperature range test. 159.115...) POLLUTION MARINE SANITATION DEVICES Design, Construction, and Testing § 159.115 Temperature range test. (a) The device must be held at a temperature of 60 °C or higher for a period of 16 hours. (b) The device...

  2. An Alternative to the Physiological Psychology Laboratory: Identification of an Unknown Drug Through Behavioral Testing.

    ERIC Educational Resources Information Center

    Schumacher, Susan J.

    1982-01-01

    A laboratory project introduced physiological psychology students to research by requiring them to identify an unknown drug given to laboratory animals. Students read material about drugs and animal drug studies, designed behavioral tests, constructed the testing apparatus, conducted the tests, and wrote progress reports. (SR)

  3. Investigating the Construct Measured by Banked Gap-Fill Items: Evidence from Eye-Tracking

    ERIC Educational Resources Information Center

    McCray, Gareth; Brunfaut, Tineke

    2018-01-01

    This study investigates test-takers' processing while completing banked gap-fill tasks, designed to test reading proficiency, in order to test theoretically based expectations about the variation in cognitive processes of test-takers across levels of performance. Twenty-eight test-takers' eye traces on 24 banked gap-fill items (on six tasks) were…

  4. Evaluation of pyrolysis and arc tracking on candidate wire insulation designs for space applications

    NASA Astrophysics Data System (ADS)

    Stueber, Thomas J.; Hammoud, Ahmad; Stavnes, Mark W.; Hrovat, Kenneth

    1994-05-01

    Polyimide wire insulation has been found to be vulnerable to pyrolization and arc tracking due to momentary short circuit arcing events. This report compares arc tracking susceptibility of candidate insulation configurations for space wiring applications. The insulation types studied in this report were gauge 20 (0.81 mm dia.) hybrid wiring constructions using polyimide, tetrafluoroethylene (TFE), cross-linked ethylene tetrafluoroethylene (XL-ETFE) and/or polytetrafluoroethylene (PTFE) insulations. These constructions were manufactured according to military wiring standards for aerospace applications. Arc track testing was conducted under DC bias and vacuum (10(exp -6) torr). The tests were conducted to compare the various insulation constructions in terms of their resistance to arc tracking restrike. The results of the tests are presented.

  5. Design and construction of a time-of-flight wall detector at External Target Facility of HIRFL-CSR

    NASA Astrophysics Data System (ADS)

    Sun, Y.; Sun, Z. Y.; Yu, Y. H.; Yan, D.; Tang, S. W.; Sun, Y. Z.; Wang, S. T.; Zhang, X. H.; Yue, K.; Fang, F.; Chen, J. L.; Zhang, Y. J.; Hu, B. T.

    2018-06-01

    A Time-Of-Flight Wall (TOFW) detector has been designed and constructed at the External Target Facility (ETF) of HIRFL-CSR. The detector covers a sensitive area of 1.2 × 1.2 m2 and consists of 30 modules. Each module is composed of a long plastic scintillator bar with two photo-multiplier tubes coupled at both ends for readout. The design and manufacture details are described and the test results are reported. The performance of the TOFW detector has been tested and measured with cosmic rays and a 310 MeV/u 40Ar beam. The results show that the time resolutions of all the TOFW modules are better than 128 ps, satisfying the requirements of the experiments which will be carried out at the ETF.

  6. Continued Water-Based Phase Change Material Heat Exchanger Development

    NASA Technical Reports Server (NTRS)

    Hansen, Scott W.; Sheth, Rubik B.; Poynot, Joe; Giglio, Tony; Ungar, Gene K.

    2015-01-01

    In a cyclical heat load environment such as low Lunar orbit, a spacecraft's radiators are not sized to meet the full heat rejection demands. Traditionally, a supplemental heat rejection device (SHReD) such as an evaporator or sublimator is used to act as a "topper" to meet the additional heat rejection demands. Utilizing a Phase Change Material (PCM) heat exchanger (HX) as a SHReD provides an attractive alternative to evaporators and sublimators as PCM HX's do not use a consumable, thereby leading to reduced launch mass and volume requirements. In continued pursuit of water PCM HX development two full-scale, Orion sized water-based PCM HX's were constructed by Mezzo Technologies. These HX's were designed by applying prior research on freeze front propagation to a full-scale design. Design options considered included bladder restraint and clamping mechanisms, bladder manufacturing, tube patterns, fill/drain methods, manifold dimensions, weight optimization, and midplate designs. Two units, Units A and B, were constructed and differed only in their midplate design. Both units failed multiple times during testing. This report highlights learning outcomes from these tests and are applied to a final sub-scale PCM HX which is slated to be tested on the ISS in early 2017.

  7. First beam measurements on the vessel for extraction and source plasma analyses (VESPA) at the Rutherford Appleton Laboratory (RAL)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lawrie, Scott R., E-mail: scott.lawrie@stfc.ac.uk; John Adams Institute for Accelerator Science, Department of Physics, University of Oxford; Faircloth, Daniel C.

    2015-04-08

    In order to facilitate the testing of advanced H{sup −} ion sources for the ISIS and Front End Test Stand (FETS) facilities at the Rutherford Appleton Laboratory (RAL), a Vessel for Extraction and Source Plasma Analyses (VESPA) has been constructed. This will perform the first detailed plasma measurements on the ISIS Penning-type H{sup −} ion source using emission spectroscopic techniques. In addition, the 30-year-old extraction optics are re-designed from the ground up in order to fully transport the beam. Using multiple beam and plasma diagnostics devices, the ultimate aim is improve H{sup −} production efficiency and subsequent transport for eithermore » long-term ISIS user operations or high power FETS requirements. The VESPA will also accommodate and test a new scaled-up Penning H{sup −} source design. This paper details the VESPA design, construction and commissioning, as well as initial beam and spectroscopy results.« less

  8. Material Testing and Initial Pavement Design Modeling: Minnesota Road Research Project

    DOT National Transportation Integrated Search

    1996-09-01

    Between January 1990 and December 1994, a study verified and applied a Corps of Engineers-developed mechanistic design and evaluation method for pavements in seasonal frost areas as part of a Construction Productivity Advancement Research (CPAR) proj...

  9. James Webb Space Telescope (JWST) Integrated Science Instrument Module (ISIM) Cryogenic Component Test Facility

    NASA Technical Reports Server (NTRS)

    Packard, Edward A.

    2004-01-01

    This viewgraph presentation provides information on the design, construction, and operation of a cryogenic chamber, and its use in testing the Integrated Science Instrument Module (ISIM) for the James Webb Space Telescope (JWST).

  10. The effect of different screw-rod design on the anti-rotational torque: a biomechanical comparison of three conventional screw-rod constructs.

    PubMed

    Huang, Zifang; Wang, Chongwen; Fan, Hengwei; Sui, Wenyuan; Li, Xueshi; Wang, Qifei; Yang, Junlin

    2017-07-28

    Screw-rod constructs have been widely used to correct spinal deformities, but the effects of different screw-rod systems on anti-rotational torque have not been determined. This study aimed to analyze the biomechanical effect of different rod-screw constructs on anti-rotational torque. Three conventional spinal screw-rod systems (Legacy, RF-F-10 and USSII) were used to test the anti-rotational torque in the material test machine. ANOVA was performed to evaluate the anti-rotational capacity of different pedicle screws-rod constructs. The anti-rotational torque of Legacy group, RF-F-10 group and USSII group were 12.3 ± 1.9 Nm, 6.8 ± 0.4 Nm, and 3.9 ± 0.8 Nm, with a P value lower than 0.05. This results indicated that the Legacy screws-rod construct could provide a highest anti-rotation capacity, which is 68% and 210% greater than RF-F-10 screw-rod construct and USSII screw-rod respectively. The anti-rotational torque may be mainly affected by screw cap and groove design. Our result showed the anti-rotational torque are: Legacy system > RF-F-10 system > USSII system, suggesting that appropriate rod-screw constructs selection in surgery may be vital for anti-rotational torque improvement and preventing derotation correction loss.

  11. ISST (Intercontinental Ballistic Missile Silo Superhardening Technology) Structure with SIFCON (Slurry-Infiltrated Fiber Concrete) - HFC-2 Test

    DTIC Science & Technology

    1988-04-01

    Government-related pro- curement, the United States Government incurs no responsibility or any obli -j gation whatsoever. The fact that the Government...Arizona. NIIERI then began a program to deveiop a slurry mix design for use in the structure, as well as construction techniques for placing the SIFCON in...OBJECTIVES 3 II CONSTRUCTION AND FIELDING OPERATIONS 4 INTRODUCTION 4 I DEMONSTRATION PROGRAM 4 Introduct ion 4 Procedure 4 Results 7 $ DESIGN 7 I ntrod uc

  12. Construction of a Full-size Component of the ICRH System

    NASA Astrophysics Data System (ADS)

    Mantovani, S.; Sassi, M.; Coppi, B.

    2012-10-01

    The ICRH system is an important component of the Ignitor project and all efforts have been made to ensure that its design takes into account the construction experience gained in the most advanced laboratories. The system is designed to operate over a frequency range 80-120 MHz, which is consistent with the use of magnetic fields in the range 9-13 T. The maximum delivered power ranges from 8 MW (at 80 MHz) to 6 MW (at 120 MHz) distributed over 4 ports. Since the transition from a detailed design to the actual construction is not without surprises we have constructed a full size prototype of the VTL between the port flange and the antenna straps, with the external support and precise guiding system. The innovative quick latching system located at the end of the coaxial cable was successfully tested, providing perfect interference with the spring Be-Cu electrical contacts. Special care was given to the finishing of the inox surfaces, and to the TIG welds. Vacuum levels of 10-6, compatible with the limit of material degassing, and electrical tests up to 12 kV without discharges have been obtained. A revision of the other key components of the Ignitor machine has been undertaken, taking into account the experience gained in the fabrication of the corresponding prototypes.

  13. Around Marshall

    NASA Image and Video Library

    1963-01-15

    At its founding, the Marshall Space Flight Center (MSFC) inherited the Army’s Jupiter and Redstone test stands, but much larger facilities were needed for the giant stages of the Saturn V. From 1960 to 1964, the existing stands were remodeled and a sizable new test area was developed. The new comprehensive test complex for propulsion and structural dynamics was unique within the nation and the free world, and they remain so today because they were constructed with foresight to meet the future as well as on going needs. Construction of the S-IC Static test stand complex began in 1961 in the west test area of MSFC, and was completed in 1964. The S-IC static test stand was designed to develop and test the 138-ft long and 33-ft diameter Saturn V S-IC first stage, or booster stage, weighing in at 280,000 pounds. Required to hold down the brute force of a 7,500,000-pound thrust produced by 5 F-1 engines, the S-IC static test stand was designed and constructed with the strength of hundreds of tons of steel and 12,000,000 pounds of cement, planted down to bedrock 40 feet below ground level. The foundation walls, constructed with concrete and steel, are 4 feet thick. The base structure consists of four towers with 40-foot-thick walls extending upward 144 feet above ground level. The structure was topped by a crane with a 135-foot boom. With the boom in the upright position, the stand was given an overall height of 405 feet, placing it among the highest structures in Alabama at the time. In addition to the stand itself, related facilities were constructed during this time. Built directly east of the test stand was the Block House, which served as the control center for the test stand. The two were connected by a narrow access tunnel which housed the cables for the controls. The F-1 Engine test stand was built north of the massive S-IC test stand. The F-1 test stand is a vertical engine firing test stand, 239 feet in elevation and 4,600 square feet in area at the base, and was designed to assist in the development of the F-1 Engine. Capability is provided for static firing of 1.5 million pounds of thrust using liquid oxygen and kerosene. Like the S-IC stand, the foundation of the F-1 stand is keyed into the bedrock approximately 40 feet below grade. Looking North, this aerial taken January 15, 1963, gives a closer view of the deep hole for the F-1 test stand site in the forefront. The S-IC test stand with towers prominent is to the right of center, and the Block House is seen left of center.

  14. LSST summit facility construction progress report: reacting to design refinements and field conditions

    NASA Astrophysics Data System (ADS)

    Barr, Jeffrey D.; Gressler, William; Sebag, Jacques; Seriche, Jaime; Serrano, Eduardo

    2016-07-01

    The civil work, site infrastructure and buildings for the summit facility of the Large Synoptic Survey Telescope (LSST) are among the first major elements that need to be designed, bid and constructed to support the subsequent integration of the dome, telescope, optics, camera and supporting systems. As the contracts for those other major subsystems now move forward under the management of the LSST Telescope and Site (T and S) team, there has been inevitable and beneficial evolution in their designs, which has resulted in significant modifications to the facility and infrastructure. The earliest design requirements for the LSST summit facility were first documented in 2005, its contracted full design was initiated in 2010, and construction began in January, 2015. During that entire development period, and extending now roughly halfway through construction, there continue to be necessary modifications to the facility design resulting from the refinement of interfaces to other major elements of the LSST project and now, during construction, due to unanticipated field conditions. Changes from evolving interfaces have principally involved the telescope mount, the dome and mirror handling/coating facilities which have included significant variations in mass, dimensions, heat loads and anchorage conditions. Modifications related to field conditions have included specifying and testing alternative methods of excavation and contending with the lack of competent rock substrate where it was predicted to be. While these and other necessary changes are somewhat specific to the LSST project and site, they also exemplify inherent challenges related to the typical timeline for the design and construction of astronomical observatory support facilities relative to the overall development of the project.

  15. Around Marshall

    NASA Image and Video Library

    1963-02-04

    At its founding, the Marshall Space Flight Center (MSFC) inherited the Army’s Jupiter and Redstone test stands, but much larger facilities were needed for the giant stages of the Saturn V. From 1960 to 1964, the existing stands were remodeled and a sizable new test area was developed. The new comprehensive test complex for propulsion and structural dynamics was unique within the nation and the free world, and they remain so today because they were constructed with foresight to meet the future as well as on going needs. Construction of the S-IC Static test stand complex began in 1961 in the west test area of MSFC, and was completed in 1964. The S-IC static test stand was designed to develop and test the 138-ft long and 33-ft diameter Saturn V S-IC first stage, or booster stage, weighing in at 280,000 pounds. Required to hold down the brute force of a 7,500,000-pound thrust produced by 5 F-1 engines, the S-IC static test stand was designed and constructed with the strength of hundreds of tons of steel and 12,000,000 pounds of cement, planted down to bedrock 40 feet below ground level. The foundation walls, constructed with concrete and steel, are 4 feet thick. The base structure consists of four towers with 40-foot-thick walls extending upward 144 feet above ground level. The structure was topped by a crane with a 135-foot boom. With the boom in the upright position, the stand was given an overall height of 405 feet, placing it among the highest structures in Alabama at the time. In addition to the stand itself, related facilities were constructed during this time. Built directly east of the test stand was the Block House, which served as the control center for the test stand. The two were connected by a narrow access tunnel which housed the cables for the controls. This photograph taken February 4, 1963, gives an impressive look at the Block House looking directly through the ever-growing four towers of the S-IC Test Stand.

  16. Isothermal dendritic growth experiment: Science, engineering, and hardware development for USMP space flights

    NASA Astrophysics Data System (ADS)

    Glicksman, M. E.; Hahn, R. C.; Koss, M. B.; Tirmizi, S. H.; Selleck, M. E.; Velosa, A.; Winsa, E.

    The Isothermal Dendritic Growth Experiment (IDGE) has been designed to provide microgravity data on dendritic growth for a critical test of theory. This paper updates our progress on constructing a crystal growth chamber suitable for space flight. The IDGE chamber is constructed from glass and stainless steel and is hermetically sealed by electron beam welds and glass-metal seals. Initial tests of the chambers sample's melting point plateau show that the new chamber design is capable of preserving the 99.9995 pct purity of succinonitrile (SCN). One can initiate dendrite growth in the center of the IDGE chamber by means of thermo-electric coolers and a capillary injector tube (stinger). The new IDGE chamber is ready for fully integrated tests with the prototype IDGE engineering hardware at NASA's Lewis Research Center.

  17. Large size GEM for Super Bigbite Spectrometer (SBS) polarimeter for Hall A 12GeV program at JLab

    DOE PAGES

    Gnanvo, Kondo; Liyanage, Nilanga; Nelyubin, Vladimir; ...

    2015-05-01

    We report on the R&D effort in the design and construction of a large size GEM chamber for the Proton Polarimeter of the Super Bigbite Spectrometer (SBS) in Hall A at Thomas Jefferson National Laboratory (JLab). The SBS Polarimeter trackers consist of two sets of four large chambers of size 200 cm x 60 cm 2. Each chamber is a vertical stack of four GEM modules with an active area of 60 cm x 50 cm. We have built and tested several GEM modules and we describe in this paper the design and construction of the final GEM as wellmore » as the preliminary results on performances from tests carried out in our detector lab and with test beams at (Fermilab).« less

  18. Psychometric Properties of the Eating Attitudes Test

    ERIC Educational Resources Information Center

    Ocker, Liette B.; Lam, Eddie T. C.; Jensen, Barbara E.; Zhang, James J.

    2007-01-01

    The study was designed to examine the construct validity and internal consistency reliability of the Eating Attitudes Test (EAT) using a confirmatory factor analysis (CFA). Two widely adopted EAT models were tested: three-factor (Dieting, Bulimia and Food Preoccupation, and Oral Control) with 26 items (Garner, Olmsted, Bohr, & Garfinkel, 1982),…

  19. 10 CFR 50.59 - Changes, tests, and experiments.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 1 2011-01-01 2011-01-01 false Changes, tests, and experiments. 50.59 Section 50.59..., Limitations, and Conditions of Licenses and Construction Permits § 50.59 Changes, tests, and experiments. (a..., the facility or procedures that affects a design function, method of performing or controlling the...

  20. 10 CFR 50.59 - Changes, tests, and experiments.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 1 2010-01-01 2010-01-01 false Changes, tests, and experiments. 50.59 Section 50.59..., Limitations, and Conditions of Licenses and Construction Permits § 50.59 Changes, tests, and experiments. (a..., the facility or procedures that affects a design function, method of performing or controlling the...

Top