Sample records for design licensing construction

  1. 10 CFR Appendix N to Part 52 - Standardization of Nuclear Power Plant Designs: Combined Licenses To Construct and Operate...

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... Licenses To Construct and Operate Nuclear Power Reactors of Identical Design at Multiple Sites N Appendix N... Designs: Combined Licenses To Construct and Operate Nuclear Power Reactors of Identical Design at Multiple... construct and operate nuclear power reactors of identical design (“common design”) to be located at multiple...

  2. 10 CFR Appendix N to Part 50 - Standardization of Nuclear Power Plant Designs: Permits To Construct and Licenses To Operate...

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... Construct and Licenses To Operate Nuclear Power Reactors of Identical Design at Multiple Sites N Appendix N... Construct and Licenses To Operate Nuclear Power Reactors of Identical Design at Multiple Sites Section 101... nuclear power reactors of essentially the same design to be located at different sites. 1 1 If the design...

  3. 10 CFR Appendix N to Part 50 - Standardization of Nuclear Power Plant Designs: Permits To Construct and Licenses To Operate...

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... Construct and Licenses To Operate Nuclear Power Reactors of Identical Design at Multiple Sites N Appendix N... Construct and Licenses To Operate Nuclear Power Reactors of Identical Design at Multiple Sites Section 101... nuclear power reactors of essentially the same design to be located at different sites. 1 1 If the design...

  4. 10 CFR Appendix N to Part 50 - Standardization of Nuclear Power Plant Designs: Permits To Construct and Licenses To Operate...

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... Construct and Licenses To Operate Nuclear Power Reactors of Identical Design at Multiple Sites N Appendix N... Construct and Licenses To Operate Nuclear Power Reactors of Identical Design at Multiple Sites Section 101... nuclear power reactors of essentially the same design to be located at different sites. 1 1 If the design...

  5. 10 CFR Appendix N to Part 50 - Standardization of Nuclear Power Plant Designs: Permits To Construct and Licenses To Operate...

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Construct and Licenses To Operate Nuclear Power Reactors of Identical Design at Multiple Sites N Appendix N... FACILITIES Pt. 50, App.N Appendix N to Part 50—Standardization of Nuclear Power Plant Designs: Permits To..., apply to construction permits and operating licenses subject to this appendix N. 2. Applications for...

  6. AP1000{sup R} licensing and deployment in the United States

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Jordan, R. P.; Russ, P. A.; Filiak, P. P.

    2012-07-01

    In recent years, both domestic and foreign utilities have turned to the standardized Westinghouse AP1000 plant design in satisfying their near - and long-term - sustainable energy needs. As direct support to these actions, licensing the AP1000 design has played a significant role by providing one of the fundamental bases in clearing regulatory hurdles leading to the start of new plant construction. Within the U.S. alone, Westinghouse AP1000 licensing activities have reached unprecedented milestones with the approvals of both AP1000 Design Certification and Southern Company's combined construction permit and operating license (COL) application directly supporting the construction of two newmore » nuclear plants in Georgia. Further COL application approvals are immediately pending for an additional two AP1000 plants in South Carolina. And, across the U.S. nuclear industry spectrum, there are 10 other COL applications under regulatory review representing some 16 new plants at 10 sites. In total, these actions represent the first wave of new plant licensing under the regulatory approval process since 1978. Fundamental to the Nuclear Regulatory Commission's AP1000 Design Certification is the formal recognition of the AP1000 passive safety design through regulatory acceptance rulemaking. Through recognition and deployment of the AP1000 Design Certification, the utility licensee / operator of this reactor design are now offered an opportunity to use a simplified 'one-step' combined license process, thereby managing substantial back-end construction schedule risk from regulatory and intervention delays. Application of this regulatory philosophy represents both acceptance and encouragement of standardized reactor designs like the AP1000. With the recent AP1000 Design Certification and utility COL acceptances, the fundamental licensing processes of this philosophy have successfully proven the attainment of significant milestones with the next stage licensing actions directed towards deployment. AP1000 Design Certification and COL deployment, and management of the plant construction in accordance with the conditions within these approvals, remain as significant site and corporate responsibilities. These licensing-construction integrated activities must now focus on identifying and resolving 'as-built' departures from the standardized design as assessed against the certified AP1000 technical and licensing basis. Within this paper, significant aspects of the AP1000 U.S. licensing will be discussed, including identifying systems and processes used in ensuring compliance while deploying the standardized design. Critical licensing steps, licensing deployment actions as plant construction progresses and defining the road forward to a successful completion of licensing actions will be addressed. (authors)« less

  7. 10 CFR Appendix N to Part 52 - Standardization of Nuclear Power Plant Designs: Combined Licenses To Construct and Operate...

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 10 Energy 2 2013-01-01 2013-01-01 false Standardization of Nuclear Power Plant Designs: Combined Licenses To Construct and Operate Nuclear Power Reactors of Identical Design at Multiple Sites N Appendix N to Part 52 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSES, CERTIFICATIONS, AND APPROVALS FOR NUCLEAR POWER PLANTS Pt. 52, App. N...

  8. 10 CFR Appendix N to Part 52 - Standardization of Nuclear Power Plant Designs: Combined Licenses To Construct and Operate...

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 10 Energy 2 2014-01-01 2014-01-01 false Standardization of Nuclear Power Plant Designs: Combined Licenses To Construct and Operate Nuclear Power Reactors of Identical Design at Multiple Sites N Appendix N to Part 52 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSES, CERTIFICATIONS, AND APPROVALS FOR NUCLEAR POWER PLANTS Pt. 52, App. N...

  9. 10 CFR Appendix N to Part 50 - Standardization of Nuclear Power Plant Designs: Permits To Construct and Licenses To Operate...

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 10 Energy 1 2014-01-01 2014-01-01 false Standardization of Nuclear Power Plant Designs: Permits To Construct and Licenses To Operate Nuclear Power Reactors of Identical Design at Multiple Sites N Appendix N to Part 50 Energy NUCLEAR REGULATORY COMMISSION DOMESTIC LICENSING OF PRODUCTION AND UTILIZATION FACILITIES Pt. 50, App. N Appendix N to Par...

  10. 10 CFR 50.55 - Conditions of construction permits, early site permits, combined licenses, and manufacturing...

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... construction or manufacture, or any defect found in the final design of a facility as approved and released for..., combined licenses, and manufacturing licenses. 50.55 Section 50.55 Energy NUCLEAR REGULATORY COMMISSION DOMESTIC LICENSING OF PRODUCTION AND UTILIZATION FACILITIES Issuance, Limitations, and Conditions of...

  11. 10 CFR 52.171 - Finality of manufacturing licenses; information requests.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... required for issuance of a construction permit, operating license, combined license, in any hearing under... manufactured reactor, the costs and benefits of severe accident mitigation design alternatives, and the bases for not incorporating severe accident mitigation design alternatives into the design of the reactor to...

  12. 10 CFR Appendix N to Part 52 - Standardization of Nuclear Power Plant Designs: Combined Licenses To Construct and Operate...

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Licenses To Construct and Operate Nuclear Power Reactors of Identical Design at Multiple Sites N Appendix N... FOR NUCLEAR POWER PLANTS Pt. 52, App. N Appendix N to Part 52—Standardization of Nuclear Power Plant... that the applicant wishes to have the application considered under 10 CFR part 52, appendix N, and must...

  13. 78 FR 65388 - Agency Information Collection Activities: Submission for the Office of Management and Budget (OMB...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-10-31

    ...: Whenever applications are made for early site permits (ESPs), standard design certifications (SDCs). 6. Who... standard NPP designs, and licenses which combine in a single license a construction permit, and an... information collected to assess the adequacy and suitability of an applicant's site, plant design...

  14. 10 CFR 50.37 - Agreement limiting access to Classified Information.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Section 50.37 Energy NUCLEAR REGULATORY COMMISSION DOMESTIC LICENSING OF PRODUCTION AND UTILIZATION... or the issuance of a license, construction permit, early site permit, or standard design approval, or before the Commission has adopted a final standard design certification rule under part 52 of this...

  15. 10 CFR 2.402 - Separate hearings on separate issues; consolidation of proceedings.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... appendix N of part 50 of this chapter for construction permits for nuclear power reactors of a type... Licenses To Construct and/or Operate Nuclear Power Plants of Identical Design at Multiple Sites § 2.402... proceedings. 2.402 Section 2.402 Energy NUCLEAR REGULATORY COMMISSION RULES OF PRACTICE FOR DOMESTIC LICENSING...

  16. 10 CFR 2.1115 - Designation of issues for adjudicatory hearing.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... at Civilian Nuclear Power Reactors § 2.1115 Designation of issues for adjudicatory hearing. (a) After... reactor already licensed to operate at the site, or any civilian nuclear power reactor for which a... the issuance of a construction permit or operating license for a civilian nuclear power reactor at...

  17. Inspection of Construction Works According to Polish Construction Law

    NASA Astrophysics Data System (ADS)

    Czemplik, A.

    2015-11-01

    Construction regulations are still different in many European countries, even though the European Union directives have unified many acts for construction works and construction products in the member countries. The scheme of the construction process presented in the paper could be valid for most countries, despite of detailed regulations of legal systems. The number of construction regulations to be followed in order to get the Construction Permit in Poland is rather big, so the time between the start of the investment process and the day when the Construction Permit is issued could be several months. Only licensed professional engineers can play the role of site managers, site inspectors and designers, registered for the given construction project. Duties and responsibilities (civil liability) of these engineers are strictly defined by regulations. The obligatory inspection of construction works should be executed by the licensed site inspectors. Moreover, the works can be incidentally inspected by Authority, banks, insurance companies or designers. Foreign designers and foreign site engineers in order to be allowed by respective Authority to play official roles on Polish construction sites should present documents proving that they can do the same jobs in their countries as per regulations obligatory there.

  18. 10 CFR 50.13 - Attacks and destructive acts by enemies of the United States; and defense activities.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... LICENSING OF PRODUCTION AND UTILIZATION FACILITIES Requirement of License, Exceptions § 50.13 Attacks and... construct and operate a production or utilization facility, or for an amendment to such license, is not required to provide for design features or other measures for the specific purpose of protection against...

  19. 10 CFR 60.32 - Conditions of construction authorization.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... GEOLOGIC REPOSITORIES Licenses Construction Authorization § 60.32 Conditions of construction authorization... changes to the features of the geologic repository and the procedures authorized. The restrictions that... setting as well as measures related to the design and construction of the geologic repository operations...

  20. 10 CFR 60.31 - Construction authorization.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... REPOSITORIES Licenses Construction Authorization § 60.31 Construction authorization. Upon review and... in a geologic repository operations area of the design proposed without unreasonable risk to the...: (1) DOE has described the proposed geologic repository including but not limited to: (i) The geologic...

  1. 10 CFR 52.99 - Inspection during construction.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... license may proceed at its own risk with design and procurement activities, and a licensee may proceed at its own risk with design, procurement, construction, and pre-operational activities, even though the... 10 CFR 50.10(a), whichever is later, its schedule for completing the inspections, tests, or analyses...

  2. 10 CFR 52.99 - Inspection during construction.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... license may proceed at its own risk with design and procurement activities, and a licensee may proceed at its own risk with design, procurement, construction, and pre-operational activities, even though the... 10 CFR 50.10(a), whichever is later, its schedule for completing the inspections, tests, or analyses...

  3. 10 CFR 52.99 - Inspection during construction.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... license may proceed at its own risk with design and procurement activities, and a licensee may proceed at its own risk with design, procurement, construction, and pre-operational activities, even though the... 10 CFR 50.10(a), whichever is later, its schedule for completing the inspections, tests, or analyses...

  4. 77 FR 71713 - Policies To Promote Rural Radio Service and To Streamline Allotment and Assignment Procedures

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-04

    ...: Control Number: 3060-0031. Title: Application for Consent to Assignment of Broadcast Station Construction... Station Construction Permit or License, FCC Form 315; Section 73.3580, Local Public Notice of Filing of... construction permits designed primarily to serve Tribal Lands (the ``Tribal Priority''). Tribal affiliated...

  5. 77 FR 16091 - Order Modifying Licenses With Regard to Requirements for Mitigation Strategies for Beyond-Design...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-19

    .... (as shown in Attachment 1)) EA-12-049 I The Licensees and construction permits (CP) holders \\1..., ``Licenses, Certifications, and Approvals for Nuclear Power Plants.'' \\1\\ CP holders, as used in this Order... that additional requirements must be imposed on Licensees or CP holders to increase the [[Page 16092...

  6. 10 CFR 73.55 - Requirements for physical protection of licensed activities in nuclear power reactors against...

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... sabotage vehicle bomb assault. (i) Land vehicles. Licensees shall: (A) Design, construct, install, and... fuel sabotage against the effects of the design basis threat of radiological sabotage land vehicle bomb...

  7. Puget Sound Tidal Energy In-Water Testing and Development Project Final Technical Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Collar, Craig W

    2012-11-16

    Tidal energy represents potential for the generation of renewable, emission free, environmentally benign, and cost effective energy from tidal flows. A successful tidal energy demonstration project in Puget Sound, Washington may enable significant commercial development resulting in important benefits for the northwest region and the nation. This project promoted the United States Department of Energy's Wind and Hydropower Technologies Program's goals of advancing the commercial viability, cost-competitiveness, and market acceptance of marine hydrokinetic systems. The objective of the Puget Sound Tidal Energy Demonstration Project is to conduct in-water testing and evaluation of tidal energy technology as a first step towardmore » potential construction of a commercial-scale tidal energy power plant. The specific goal of the project phase covered by this award was to conduct all activities necessary to complete engineering design and obtain construction approvals for a pilot demonstration plant in the Admiralty Inlet region of the Puget Sound. Public Utility District No. 1 of Snohomish County (The District) accomplished the objectives of this award through four tasks: Detailed Admiralty Inlet Site Studies, Plant Design and Construction Planning, Environmental and Regulatory Activities, and Management and Reporting. Pre-Installation studies completed under this award provided invaluable data used for site selection, environmental evaluation and permitting, plant design, and construction planning. However, these data gathering efforts are not only important to the Admiralty Inlet pilot project. Lessons learned, in particular environmental data gathering methods, can be applied to future tidal energy projects in the United States and other parts of the world. The District collaborated extensively with project stakeholders to complete the tasks for this award. This included Federal, State, and local government agencies, tribal governments, environmental groups, and others. All required permit and license applications were completed and submitted under this award, including a Final License Application for a pilot hydrokinetic license from the Federal Energy Regulatory Commission. The tasks described above have brought the project through all necessary requirements to construct a tidal pilot project in Admiralty Inlet with the exception of final permit and license approvals, and the selection of a general contractor to perform project construction.« less

  8. 10 CFR 50.90 - Application for amendment of license, construction permit, or early site permit.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ..., or early site permit. 50.90 Section 50.90 Energy NUCLEAR REGULATORY COMMISSION DOMESTIC LICENSING OF....90 Application for amendment of license, construction permit, or early site permit. Whenever a holder of a license, including a construction permit and operating license under this part, and an early...

  9. 10 CFR 50.90 - Application for amendment of license, construction permit, or early site permit.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ..., or early site permit. 50.90 Section 50.90 Energy NUCLEAR REGULATORY COMMISSION DOMESTIC LICENSING OF....90 Application for amendment of license, construction permit, or early site permit. Whenever a holder of a license, including a construction permit and operating license under this part, and an early...

  10. 47 CFR 90.725 - Construction requirements for Phase I licensees.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... granted commercial nationwide authorizations will be required to construct base stations and placed those base stations in operation as follows: (1) In at least 10 percent of the geographic areas designated in the application within two years of initial license grant, including base stations in at least seven...

  11. 10 CFR 2.400 - Scope of subpart.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... to construct and/or operate nuclear power reactors of identical design to be located at multiple... Procedures Applicable to Proceedings for the Issuance of Licenses To Construct and/or Operate Nuclear Power... 10 Energy 1 2010-01-01 2010-01-01 false Scope of subpart. 2.400 Section 2.400 Energy NUCLEAR...

  12. 10 CFR 73.55 - Requirements for physical protection of licensed activities in nuclear power reactors against...

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... shall: (i) Design, construct, install and maintain physical barriers as necessary to control access into.... (10) Vehicle control measures. Consistent with the physical protection program design requirements of... maintain vehicle control measures, as necessary, to protect against the design basis threat of radiological...

  13. 10 CFR 73.55 - Requirements for physical protection of licensed activities in nuclear power reactors against...

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... shall: (i) Design, construct, install and maintain physical barriers as necessary to control access into.... (10) Vehicle control measures. Consistent with the physical protection program design requirements of... maintain vehicle control measures, as necessary, to protect against the design basis threat of radiological...

  14. 10 CFR 73.55 - Requirements for physical protection of licensed activities in nuclear power reactors against...

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... shall: (i) Design, construct, install and maintain physical barriers as necessary to control access into.... (10) Vehicle control measures. Consistent with the physical protection program design requirements of... maintain vehicle control measures, as necessary, to protect against the design basis threat of radiological...

  15. 10 CFR 60.61 - Provision of information.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... characterization, siting, development, design, licensing, construction, operation, regulation, permanent closure... available at the NRC Web site, http://www.nrc.gov, and/or at the NRC Public Document Room, and copies are...

  16. Compulsory licensing in Canada and Thailand: comparing regimes to ensure legitimate use of the WTO rules.

    PubMed

    Lybecker, Kristina M; Fowler, Elisabeth

    2009-01-01

    This paper examines two recent examples of compulsory licensing legislation: one globally embraced regime and one internationally controversial regime operating under the same WTO rules. In particular, we consider Canadian legislation and the use of compulsory licensing for HIV/AIDS drugs destined for a developing country. This is then contrasted with the conditions under which Thai authorities are pursuing compulsory licenses, the outcomes of their compulsory licenses, as well as the likely impact of the Thai policy. Finally, we construct a rubric to evaluate characteristics of a successful regime. This is used to analyze the Canadian and Thai regimes and frame the expected implications of each national policy. It is hoped that the assessment will guide changes to compulsory licensing design to ensure that legitimate regimes are embraced while illegitimate ones are disallowed.

  17. 75 FR 33357 - Agency Information Collection Activities: Submission for the Office of Management and Budget (OMB...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-11

    ... or asked to report: Licensees and applicants for nuclear power plants and research and test... detailed review of applications for licenses and amendments thereto to construct and operate nuclear power plants, preliminary or final design approvals, design certifications, research and test facilities...

  18. 10 CFR 32.26 - Gas and aerosol detectors containing byproduct material: Requirements for license to manufacture...

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... byproduct material and designed to protect life or property from fires and airborne hazards, or to initially... submits sufficient information relating to the design, manufacture, prototype testing, quality control... paragraphs (b) (3) and (12) of this section; (5) Details of construction and design of the product as related...

  19. 10 CFR 32.26 - Gas and aerosol detectors containing byproduct material: Requirements for license to manufacture...

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... byproduct material and designed to protect life or property from fires and airborne hazards, or to initially... submits sufficient information relating to the design, manufacture, prototype testing, quality control... paragraphs (b) (3) and (12) of this section; (5) Details of construction and design of the product as related...

  20. 25 CFR 170.462 - When may a self-determination contract or self-governance agreement include PS&E review and...

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ..., DEPARTMENT OF THE INTERIOR LAND AND WATER INDIAN RESERVATION ROADS PROGRAM Planning, Design, and Construction... design and approval of the PS&E package; (2) A licensed professional engineer will certify that the PS&E meets or exceeds the design, health, and safety standards in appendix B to subpart D for an IRR...

  1. Hydropower: A Regulatory Guide to Permitting and Licensing in Idaho, Montana, Oregon, and Washington.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    McCoy, Gilbert A.

    1992-12-01

    The design, construction and operation of a hydropower project can result in many potential impacts. These potential impacts are of concern to a host of federal, state, and local authorities. Early consultation with land and water management, fish and wildlife resource protection, and health and human safety-oriented agencies should occur to determine specific concerns and study requirements for each proposed project. This Guide to Permitting and Licensing outlines the characteristic features of attractive hydropower sites; summarizes an array of developmental constraints; illustrates potential environmental impacts and concerns; and summarizes all federal, state, and local permitting and licensing requirements.

  2. Hydropower : A Regulatory Guide to Permitting and Licensing in Idaho, Montana, Oregon, and Washington.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    McCoy, Gilbert A.

    1992-12-01

    The design, construction and operation of a hydropower project can result in many potential impacts. These potential impacts are of concern to a host of federal, state, and local authorities. Early consultation with land and water management, fish and wildlife resource protection, and health and human safety-oriented agencies should occur to determine specific concerns and study requirements for each proposed project. This Guide to Permitting and Licensing outlines the characteristic features of attractive hydropower sites; summarizes an array of developmental constraints; illustrates potential environmental impacts and concerns; and summarizes all federal, state, and local permitting and licensing requirements.

  3. 47 CFR 90.767 - Construction and implementation of EA and Regional licenses.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Regional licenses. 90.767 Section 90.767 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED... Use of Frequencies in the 220-222 MHz Band Policies Governing the Licensing and Use of Phase II Ea, Regional and Nationwide Systems § 90.767 Construction and implementation of EA and Regional licenses. (a...

  4. 78 FR 10212 - Walking and Working Surfaces Standard for General Industry; Extension of the Office of Management...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-13

    ... part thereof, used for mercantile, business, industrial, or storage purposes, the loads approved by the... designed by a licensed professional engineer, they shall be constructed and erected in accordance with...

  5. 10 CFR 50.23 - Construction permits.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 10 Energy 1 2012-01-01 2012-01-01 false Construction permits. 50.23 Section 50.23 Energy NUCLEAR... Description of Licenses § 50.23 Construction permits. A construction permit for the construction of a... part 52 of this chapter, the construction permit and operating license are deemed to be combined in a...

  6. 10 CFR 50.23 - Construction permits.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 10 Energy 1 2014-01-01 2014-01-01 false Construction permits. 50.23 Section 50.23 Energy NUCLEAR... Description of Licenses § 50.23 Construction permits. A construction permit for the construction of a... part 52 of this chapter, the construction permit and operating license are deemed to be combined in a...

  7. 10 CFR 50.23 - Construction permits.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 10 Energy 1 2013-01-01 2013-01-01 false Construction permits. 50.23 Section 50.23 Energy NUCLEAR... Description of Licenses § 50.23 Construction permits. A construction permit for the construction of a... part 52 of this chapter, the construction permit and operating license are deemed to be combined in a...

  8. 10 CFR 50.23 - Construction permits.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 1 2010-01-01 2010-01-01 false Construction permits. 50.23 Section 50.23 Energy NUCLEAR... Description of Licenses § 50.23 Construction permits. A construction permit for the construction of a... part 52 of this chapter, the construction permit and operating license are deemed to be combined in a...

  9. 10 CFR 32.14 - Certain items containing byproduct material; requirements for license to apply or initially...

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... maximum quantity of byproduct material in each product; (2) Details of construction and design of each... experimental studies and tests, required by the Commission to facilitate a determination of the safety of the...

  10. 10 CFR Appendix N to Part 52 - Standardization of Nuclear Power Plant Designs: Combined Licenses To Construct and Operate...

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... structures, systems, and components important to radiological health and safety and the common defense and... report on the environmental impacts of the common design. 5. Upon a determination that each application.... 6. The NRC staff shall prepare draft and final environmental impact statements for each of the...

  11. 10 CFR 32.61 - Ice detection devices containing strontium-90; requirements for license to manufacture or...

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... physical form and maximum quantity of strontium-90 in the device; (2) Details of construction and design of... handling and installation of the device; (8) Any additional information, including experimental studies and... ordinary circumstances of use; (3) The device is so designed that it cannot be easily disassembled; (4) The...

  12. 10 CFR 32.53 - Luminous safety devices for use in aircraft: Requirements for license to manufacture, assemble...

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... maximum quantity of tritium or promethium-147 in each device; (2) Details of construction and design; (3... information, including experimental studies and tests, required by the Commission to facilitate a... direct physical contact by any person with it; (3) The device is so designed that it cannot easily be...

  13. 10 CFR 32.53 - Luminous safety devices for use in aircraft: Requirements for license to manufacture, assemble...

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... maximum quantity of tritium or promethium-147 in each device; (2) Details of construction and design; (3... information, including experimental studies and tests, required by the Commission to facilitate a... direct physical contact by any person with it; (3) The device is so designed that it cannot easily be...

  14. 47 CFR 90.769 - Construction and implementation of Phase II nationwide licenses.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Use of Frequencies in the 220-222 MHz Band Policies Governing the Licensing and Use of Phase II Ea, Regional and Nationwide Systems § 90.769 Construction and implementation of Phase II nationwide licenses...

  15. Site characterization progress report: Yucca Mountain, Nevada. Number 15, April 1--September 30, 1996

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1997-04-01

    During the second half of fiscal year 1996, activities at the Yucca Mountain Site Characterization Project (Project) supported the objectives of the revised Program Plan released this period by the Office of Civilian Radioactive Waste Management of the US Department of Energy (Department). Outlined in the revised plan is a focused, integrated program of site characterization, design, engineering, environmental, and performance assessment activities that will achieve key Program and statutory objectives. The plan will result in the development of a license application for repository construction at Yucca Mountain, if the site is found suitable. Activities this period focused on twomore » of the three near-term objectives of the revised plan: updating in 1997 the regulatory framework for determining the suitability of the site for the proposed repository concept and providing information for a 1998 viability assessment of continuing toward the licensing of a repository. The Project has also developed a new design approach that uses the advanced conceptual design published during the last reporting period as a base for developing a design that will support the viability assessment. The initial construction phase of the Thermal Testing Facility was completed and the first phase of the in situ heater tests began on schedule. In addition, phase-one construction was completed for the first of two alcoves that will provide access to the Ghost Dance fault.« less

  16. 10 CFR 2.401 - Notice of hearing on construction permit or combined license applications pursuant to appendix N...

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... pursuant to appendix N of part 50 of this chapter for construction permits for nuclear power reactors of... Procedures Applicable to Proceedings for the Issuance of Licenses To Construct and/or Operate Nuclear Power... license applications pursuant to appendix N of 10 CFR parts 50 or 52. 2.401 Section 2.401 Energy NUCLEAR...

  17. 10 CFR 32.53 - Luminous safety devices for use in aircraft: Requirements for license to manufacture, assemble...

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... maximum quantity of tritium or promethium-147 in each device; (2) Details of construction and design; (3... experimental studies and tests, required by the Commission to facilitate a determination of the safety of the... contact by any person with it; (3) The device is so designed that it cannot easily be disassembled; and (4...

  18. 10 CFR 32.53 - Luminous safety devices for use in aircraft: Requirements for license to manufacture, assemble...

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... maximum quantity of tritium or promethium-147 in each device; (2) Details of construction and design; (3... experimental studies and tests, required by the Commission to facilitate a determination of the safety of the... contact by any person with it; (3) The device is so designed that it cannot easily be disassembled; and (4...

  19. 10 CFR 32.53 - Luminous safety devices for use in aircraft: Requirements for license to manufacture, assemble...

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... maximum quantity of tritium or promethium-147 in each device; (2) Details of construction and design; (3... experimental studies and tests, required by the Commission to facilitate a determination of the safety of the... contact by any person with it; (3) The device is so designed that it cannot easily be disassembled; and (4...

  20. 10 CFR 52.167 - Issuance of manufacturing license.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... proposed reactor(s) can be incorporated into a nuclear power plant and operated at sites having... design and manufacture the proposed nuclear power reactor(s); (5) The proposed inspections, tests... the construction of a nuclear power facility using the manufactured reactor(s). (2) A holder of a...

  1. Reflecting on Graphs: Attributes of Graph Choice and Construction Practices in Biology.

    PubMed

    Angra, Aakanksha; Gardner, Stephanie M

    2017-01-01

    Undergraduate biology education reform aims to engage students in scientific practices such as experimental design, experimentation, and data analysis and communication. Graphs are ubiquitous in the biological sciences, and creating effective graphical representations involves quantitative and disciplinary concepts and skills. Past studies document student difficulties with graphing within the contexts of classroom or national assessments without evaluating student reasoning. Operating under the metarepresentational competence framework, we conducted think-aloud interviews to reveal differences in reasoning and graph quality between undergraduate biology students, graduate students, and professors in a pen-and-paper graphing task. All professors planned and thought about data before graph construction. When reflecting on their graphs, professors and graduate students focused on the function of graphs and experimental design, while most undergraduate students relied on intuition and data provided in the task. Most undergraduate students meticulously plotted all data with scaled axes, while professors and some graduate students transformed the data, aligned the graph with the research question, and reflected on statistics and sample size. Differences in reasoning and approaches taken in graph choice and construction corroborate and extend previous findings and provide rich targets for undergraduate and graduate instruction. © 2017 A. Angra and S. M. Gardner. CBE—Life Sciences Education © 2017 The American Society for Cell Biology. This article is distributed by The American Society for Cell Biology under license from the author(s). It is available to the public under an Attribution–Noncommercial–Share Alike 3.0 Unported Creative Commons License (http://creativecommons.org/licenses/by-nc-sa/3.0).

  2. Waste Handeling Building Conceptual Study

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    G.W. Rowe

    2000-11-06

    The objective of the ''Waste Handling Building Conceptual Study'' is to develop proposed design requirements for the repository Waste Handling System in sufficient detail to allow the surface facility design to proceed to the License Application effort if the proposed requirements are approved by DOE. Proposed requirements were developed to further refine waste handling facility performance characteristics and design constraints with an emphasis on supporting modular construction, minimizing fuel inventory, and optimizing facility maintainability and dry handling operations. To meet this objective, this study attempts to provide an alternative design to the Site Recommendation design that is flexible, simple, reliable,more » and can be constructed in phases. The design concept will be input to the ''Modular Design/Construction and Operation Options Report'', which will address the overall program objectives and direction, including options and issues associated with transportation, the subsurface facility, and Total System Life Cycle Cost. This study (herein) is limited to the Waste Handling System and associated fuel staging system.« less

  3. 10 CFR 50.59 - Changes, tests, and experiments.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 1 2011-01-01 2011-01-01 false Changes, tests, and experiments. 50.59 Section 50.59..., Limitations, and Conditions of Licenses and Construction Permits § 50.59 Changes, tests, and experiments. (a..., the facility or procedures that affects a design function, method of performing or controlling the...

  4. 10 CFR 50.59 - Changes, tests, and experiments.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 1 2010-01-01 2010-01-01 false Changes, tests, and experiments. 50.59 Section 50.59..., Limitations, and Conditions of Licenses and Construction Permits § 50.59 Changes, tests, and experiments. (a..., the facility or procedures that affects a design function, method of performing or controlling the...

  5. 10 CFR 52.99 - Inspection during construction; ITAAC schedules and notifications; NRC notices.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ...; ITAAC schedules and notifications; NRC notices. (a) Licensee schedule for completing inspections, tests... schedule for completing the inspections, tests, or analyses in the ITAAC. The licensee shall submit updates... combined license may proceed at its own risk with design and procurement activities, and a licensee may...

  6. 10 CFR 52.99 - Inspection during construction; ITAAC schedules and notifications; NRC notices.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ...; ITAAC schedules and notifications; NRC notices. (a) Licensee schedule for completing inspections, tests... schedule for completing the inspections, tests, or analyses in the ITAAC. The licensee shall submit updates... combined license may proceed at its own risk with design and procurement activities, and a licensee may...

  7. 75 FR 33361 - Notice of Issuance of Regulatory Guide

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-11

    ... staff needs in its review of applications for permits and licenses. Revision 4 of Regulatory Guide 1.28... (Design and Construction).'' Proposed RG 1.28, Revision 4, extends the scope of the NRC's endorsement to...: Nuclear Regulatory Commission. ACTION: Notice of Issuance and Availability of Regulatory Guide 1.28...

  8. 47 CFR 25.113 - Station licenses and launch authority.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    .... Construction of such stations may commence prior to grant of a license at the applicant's own risk. Applicants... FCC Antenna Structure Registration Number(s) for the affected structure(s). If no such number has been... for the antenna structure in question. (f) Construction permits are not required for U.S.-licensed...

  9. 47 CFR 25.113 - Station licenses and launch authority.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    .... Construction of such stations may commence prior to grant of a license at the applicant's own risk. Applicants... FCC Antenna Structure Registration Number(s) for the affected structure(s). If no such number has been... for the antenna structure in question. (f) Construction permits are not required for U.S.-licensed...

  10. 10 CFR 2.104 - Notice of hearing.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... work authorization, construction permit, early site permit, or combined license for a facility of the... work authorization, construction permit, early site permit, or combined license for a facility of the... hearing concerning an application for a limited work authorization, construction permit, early site permit...

  11. Convoy projects: a case study from Germany

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Gruener, W.

    The Convoy concept was formulated at a time when Kraftwerk Union (KWU) anticipated the start of five to six turnkey nuclear power plant projects within a very short time frame, related to as many customers, sites, and licensing authorities. To counteract the rapidly escalating costs and schedules of projects then under construction, a series of measures were enacted with the purpose of streamlining and optimizing the work procedures both within the company and in relation with the external partners - customers, licensing authorities and their technical advisors, suppliers, and subsuppliers. The organizational framework and the various tools deployed by themore » turnkey contractor ensured smooth and effective design and construction procedures. The adherence to the original budget and schedule is truly remarkable, encouraging further investigation into the applicability of such methods and procedures for future projects.« less

  12. 10 CFR 50.55 - Conditions of construction permits, early site permits, combined licenses, and manufacturing...

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 1 2011-01-01 2011-01-01 false Conditions of construction permits, early site permits... Licenses and Construction Permits § 50.55 Conditions of construction permits, early site permits, combined... conditions; each early site permit is subject to the terms and conditions in paragraph (f) of this section...

  13. DEVELOPMENT OF HFE SECTIONS OF DG-1145.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    HIGGINS,J.C.; OHARA, J.M.; BONGARRA, J.

    2007-03-26

    For the licensing of the current fleet of commercial nuclear power plants (NPPs), the Nuclear Regulatory Commission (NRC) used two key documents, NUREG-0800 and Regulatory Guide (RG) 1.70. RG 1.70 provided guidance to applicants on the contents needed in their Safety Analysis Reports (SARs) submitted as part of their application to construct or operate an NPP. NUREG-0800, the NRC Standard Review Plan (SRP), provides guidance to the NRR staff reviewers on performing their safety reviews of these applications. As part of the preparation for a new wave of improved NPP designs the NRC is in the process of updating themore » SRP and is also developing a new RG designated as draft RG or DG-1145, ''Combined License Applications for Nuclear Power Plants (LWR Edition).'' This will eventually become RG 1.206 and will take the place of RG 1.70. This will provide guidance for combined license (COL) applicants, as well as for other 10CFR Part 52 variations that are permitted.« less

  14. 47 CFR 1.2113 - Construction prior to grant of application.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Competitive Bidding Proceedings General Procedures § 1.2113 Construction prior to grant of application. Subject to the provisions of this section, applicants for licenses awarded by competitive bidding may..., applicants must not begin to construct facilities for licenses subject to competitive bidding. (a) When...

  15. 47 CFR 1.2113 - Construction prior to grant of application.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Competitive Bidding Proceedings General Procedures § 1.2113 Construction prior to grant of application. Subject to the provisions of this section, applicants for licenses awarded by competitive bidding may..., applicants must not begin to construct facilities for licenses subject to competitive bidding. (a) When...

  16. 10 CFR 50.52 - Combining licenses.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 1 2010-01-01 2010-01-01 false Combining licenses. 50.52 Section 50.52 Energy NUCLEAR REGULATORY COMMISSION DOMESTIC LICENSING OF PRODUCTION AND UTILIZATION FACILITIES Issuance, Limitations, and Conditions of Licenses and Construction Permits § 50.52 Combining licenses. The Commission may combine in a...

  17. 10 CFR 60.41 - Standards for issuance of a license.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... REPOSITORIES Licenses License Issuance and Amendment § 60.41 Standards for issuance of a license. A license to receive and possess source, special nuclear, or byproduct material at a geologic repository operations area may be issued by the Commission upon finding that: (a) Construction of the geologic repository...

  18. Wage and Hour Administration, Alaska Department of Labor

    Science.gov Websites

    Preference Enforcement; Licensing Employment Agencies; Construction Contractor Licensing; and Alaska Family Contractor Licensing program protects the public from unlicensed, unbonded contractors, while protecting

  19. 10 CFR 36.81 - Records and retention periods.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... required by § 36.55 until the Commission terminates the license. (f) Records of radiation surveys required by § 36.57 for 3 years from the date of the survey. (g) Records of radiation survey meter...) Records on the design checks required by § 36.39 and the construction control checks as required by § 36...

  20. 10 CFR 36.81 - Records and retention periods.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... required by § 36.55 until the Commission terminates the license. (f) Records of radiation surveys required by § 36.57 for 3 years from the date of the survey. (g) Records of radiation survey meter...) Records on the design checks required by § 36.39 and the construction control checks as required by § 36...

  1. 10 CFR 36.81 - Records and retention periods.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... required by § 36.55 until the Commission terminates the license. (f) Records of radiation surveys required by § 36.57 for 3 years from the date of the survey. (g) Records of radiation survey meter...) Records on the design checks required by § 36.39 and the construction control checks as required by § 36...

  2. 10 CFR 36.81 - Records and retention periods.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... required by § 36.55 until the Commission terminates the license. (f) Records of radiation surveys required by § 36.57 for 3 years from the date of the survey. (g) Records of radiation survey meter...) Records on the design checks required by § 36.39 and the construction control checks as required by § 36...

  3. 47 CFR 73.3500 - Application and report forms.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Wireless Telecommunications Bureau Application for Assignments of Authorization and Transfers of Control... Station Construction Permit or License. 315 Application for Consent to Transfer of Control of Corporation... Broadcast Station Construction Permit or License or Transfer of Control of Corporation Holding Broadcast...

  4. Functional Requirements of an Advanced Instructional Design Advisor: Task Analysis and Troubleshooting Volume 2

    DTIC Science & Technology

    1992-09-01

    would be relevant to constructing a transactional shell that could be used by a person who is a subject matter expert, but a novice instructional designer...or other data, is not to be regarded by implication, or otherwise in any manner construed, as licensing the holder, or any other person or...process of producing effective computer-based instructional materials is complex and time- consuming . Few experts exist to ensure the effectiveness of

  5. 10 CFR 40.33 - Issuance of a license for a uranium enrichment facility.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 1 2011-01-01 2011-01-01 false Issuance of a license for a uranium enrichment facility... License Applications § 40.33 Issuance of a license for a uranium enrichment facility. (a) The Commission... the licensing of the construction and operation of a uranium enrichment facility. The Commission will...

  6. 10 CFR 40.33 - Issuance of a license for a uranium enrichment facility.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 10 Energy 1 2012-01-01 2012-01-01 false Issuance of a license for a uranium enrichment facility... License Applications § 40.33 Issuance of a license for a uranium enrichment facility. (a) The Commission... the licensing of the construction and operation of a uranium enrichment facility. The Commission will...

  7. 10 CFR 40.33 - Issuance of a license for a uranium enrichment facility.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 10 Energy 1 2013-01-01 2013-01-01 false Issuance of a license for a uranium enrichment facility... License Applications § 40.33 Issuance of a license for a uranium enrichment facility. (a) The Commission... the licensing of the construction and operation of a uranium enrichment facility. The Commission will...

  8. 10 CFR 40.33 - Issuance of a license for a uranium enrichment facility.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 10 Energy 1 2014-01-01 2014-01-01 false Issuance of a license for a uranium enrichment facility... License Applications § 40.33 Issuance of a license for a uranium enrichment facility. (a) The Commission... the licensing of the construction and operation of a uranium enrichment facility. The Commission will...

  9. 10 CFR Appendix S to Part 50 - Earthquake Engineering Criteria for Nuclear Power Plants

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... under part 50, or a design certification, combined license, design approval, or manufacturing license... license, design approval, or manufacturing license is required by §§ 50.34(a)(12), 50.34(b)(10), or 10 CFR... design for a nuclear power facility. Manufacturing license means a license, issued under subpart F of...

  10. Shuttle Engine Designs Revolutionize Solar Power

    NASA Technical Reports Server (NTRS)

    2014-01-01

    The Space Shuttle Main Engine was built under contract to Marshall Space Flight Center by Rocketdyne, now part of Pratt & Whitney Rocketdyne (PWR). PWR applied its NASA experience to solar power technology and licensed the technology to Santa Monica, California-based SolarReserve. The company now develops concentrating solar power projects, including a plant in Nevada that has created 4,300 jobs during construction.

  11. 76 FR 50767 - Southern Nuclear Operating Co., et al.; Combined Licenses for Vogtle Electric Generating Plant...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-16

    ... Limited Work Authorizations AGENCY: Nuclear Regulatory Commission. ACTION: Notice of hearing. SUMMARY: The... Southern Nuclear Operating Company for two combined licenses (COLs) seeking approval to construct and...), as well as for two limited work authorizations (LWAs) to engage in selected construction activities...

  12. 18 CFR 4.1 - Initial cost statement.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... OF PROJECT COSTS Determination of Cost of Projects Constructed Under License § 4.1 Initial cost statement. (a) Notification of Commission. When a project is constructed under a license issued under the... 18 Conservation of Power and Water Resources 1 2011-04-01 2011-04-01 false Initial cost statement...

  13. 18 CFR 4.1 - Initial cost statement.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... OF PROJECT COSTS Determination of Cost of Projects Constructed Under License § 4.1 Initial cost statement. (a) Notification of Commission. When a project is constructed under a license issued under the... 18 Conservation of Power and Water Resources 1 2014-04-01 2014-04-01 false Initial cost statement...

  14. 18 CFR 4.1 - Initial cost statement.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... OF PROJECT COSTS Determination of Cost of Projects Constructed Under License § 4.1 Initial cost statement. (a) Notification of Commission. When a project is constructed under a license issued under the... 18 Conservation of Power and Water Resources 1 2012-04-01 2012-04-01 false Initial cost statement...

  15. 18 CFR 4.1 - Initial cost statement.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... OF PROJECT COSTS Determination of Cost of Projects Constructed Under License § 4.1 Initial cost statement. (a) Notification of Commission. When a project is constructed under a license issued under the... 18 Conservation of Power and Water Resources 1 2013-04-01 2013-04-01 false Initial cost statement...

  16. 47 CFR 25.133 - Period of construction; certification of commencement of operation.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ...) COMMON CARRIER SERVICES SATELLITE COMMUNICATIONS Applications and Licenses Earth Stations § 25.133 Period of construction; certification of commencement of operation. (a)(1) Each license for an earth station governed by this part, except for mobile satellite earth station terminals (METs), shall specify as a...

  17. 47 CFR 25.133 - Period of construction; certification of commencement of operation.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ...) COMMON CARRIER SERVICES SATELLITE COMMUNICATIONS Applications and Licenses Earth Stations § 25.133 Period of construction; certification of commencement of operation. (a)(1) Each initial license for an earth... the earth station must be completed and the station must be brought into operation within 12 months...

  18. 47 CFR 25.133 - Period of construction; certification of commencement of operation.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ...) COMMON CARRIER SERVICES SATELLITE COMMUNICATIONS Applications and Licenses Earth Stations § 25.133 Period of construction; certification of commencement of operation. (a)(1) Each license for an earth station governed by this part, except for mobile earth stations, shall specify as a condition therein the period in...

  19. 47 CFR 25.133 - Period of construction; certification of commencement of operation.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ...) COMMON CARRIER SERVICES SATELLITE COMMUNICATIONS Applications and Licenses Earth Stations § 25.133 Period of construction; certification of commencement of operation. (a)(1) Each license for an earth station governed by this part, except for mobile satellite earth station terminals (METs), shall specify as a...

  20. 47 CFR 25.133 - Period of construction; certification of commencement of operation.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ...) COMMON CARRIER SERVICES SATELLITE COMMUNICATIONS Applications and Licenses Earth Stations § 25.133 Period of construction; certification of commencement of operation. (a)(1) Each license for an earth station governed by this part, except for mobile satellite earth station terminals (METs), shall specify as a...

  1. Mental Illness Training for Licensed Staff in Long-Term Care

    PubMed Central

    Irvine, A. Blair; Billow, Molly B.; Eberhage, Mark G.; Seeley, John R.; McMahon, Edward; Bourgeois, Michelle

    2013-01-01

    Licensed care staff working in long-term care facilities may be poorly prepared to work with residents with mental illness. This research reports on the program evaluation of Caring Skills: Working with Mental Illness, a training program delivered on the Internet. It was tested with a randomized treatment-control design, with an eight-week follow-up. The training provided video-based behavioral skills and knowledge training. Measures included video situations testing and assessment of psycho-social constructs including empathy and stigmatization. ANCOVA analysis at 4-weeks posttest showed significant positive effects with medium-large effect sizes, which were largely maintained at the 8-week follow-up. The training was well-received by the users. PMID:22364430

  2. ITER Construction—Plant System Integration

    NASA Astrophysics Data System (ADS)

    Tada, E.; Matsuda, S.

    2009-02-01

    This brief paper introduces how the ITER will be built in the international collaboration. The ITER Organization plays a central role in constructing ITER and leading it into operation. Since most of the ITER components are to be provided in-kind from the member countries, integral project management should be scoped in advance of real work. Those include design, procurement, system assembly, testing, licensing and commissioning of ITER.

  3. 10 CFR 51.50 - Environmental report-construction permit, early site permit, or combined license stage.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... costs of the proposed action or an evaluation of alternative energy sources. (3) For other than light... 10 Energy 2 2011-01-01 2011-01-01 false Environmental report-construction permit, early site permit, or combined license stage. 51.50 Section 51.50 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED...

  4. 10 CFR 51.50 - Environmental report-construction permit, early site permit, or combined license stage.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... costs of the proposed action or an evaluation of alternative energy sources. (3) For other than light... 10 Energy 2 2013-01-01 2013-01-01 false Environmental report-construction permit, early site permit, or combined license stage. 51.50 Section 51.50 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED...

  5. 10 CFR 51.50 - Environmental report-construction permit, early site permit, or combined license stage.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... costs of the proposed action or an evaluation of alternative energy sources. (3) For other than light... 10 Energy 2 2010-01-01 2010-01-01 false Environmental report-construction permit, early site permit, or combined license stage. 51.50 Section 51.50 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED...

  6. 10 CFR 51.50 - Environmental report-construction permit, early site permit, or combined license stage.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... costs of the proposed action or an evaluation of alternative energy sources. (3) For other than light... 10 Energy 2 2014-01-01 2014-01-01 false Environmental report-construction permit, early site permit, or combined license stage. 51.50 Section 51.50 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED...

  7. 10 CFR 51.50 - Environmental report-construction permit, early site permit, or combined license stage.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... costs of the proposed action or an evaluation of alternative energy sources. (3) For other than light... 10 Energy 2 2012-01-01 2012-01-01 false Environmental report-construction permit, early site permit, or combined license stage. 51.50 Section 51.50 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED...

  8. 47 CFR 90.769 - Construction and implementation of Phase II nationwide licenses.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    .... (a) A nationwide licensee must construct a sufficient number of base stations (i.e., base stations... square kilometers or 37.5 percent of the United States population within five years of the issuance of... United States population within ten years of the issuance of its initial license. Licensees may, in the...

  9. 47 CFR 90.769 - Construction and implementation of Phase II nationwide licenses.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    .... (a) A nationwide licensee must construct a sufficient number of base stations (i.e., base stations... square kilometers or 37.5 percent of the United States population within five years of the issuance of... United States population within ten years of the issuance of its initial license. Licensees may, in the...

  10. 47 CFR 90.769 - Construction and implementation of Phase II nationwide licenses.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    .... (a) A nationwide licensee must construct a sufficient number of base stations (i.e., base stations... square kilometers or 37.5 percent of the United States population within five years of the issuance of... United States population within ten years of the issuance of its initial license. Licensees may, in the...

  11. 47 CFR 25.113 - Station licenses and launch authority.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... is required by part 17 of this chapter, must include the FCC Antenna Structure Registration Number(s) for the affected structure(s). If no such number has been assigned at the time the application is...) Construction permits are not required for U.S.-licensed space stations. Construction of such stations may...

  12. 47 CFR 73.3536 - Application for license to cover construction permit.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... Low Power TV, TV Translator or TV Booster Station License.” (5) FCC Form 350, “Application for an FM Translator or FM Booster Station License.” (6) FCC Form 319, “Application for a Low Power FM Broadcast...

  13. 47 CFR 73.3536 - Application for license to cover construction permit.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... Low Power TV, TV Translator or TV Booster Station License.” (5) FCC Form 350, “Application for an FM Translator or FM Booster Station License.” (6) FCC Form 319, “Application for a Low Power FM Broadcast...

  14. 47 CFR 73.3536 - Application for license to cover construction permit.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Low Power TV, TV Translator or TV Booster Station License.” (5) FCC Form 350, “Application for an FM Translator or FM Booster Station License.” (6) FCC Form 319, “Application for a Low Power FM Broadcast...

  15. 47 CFR 73.3536 - Application for license to cover construction permit.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... Low Power TV, TV Translator or TV Booster Station License.” (5) FCC Form 350, “Application for an FM Translator or FM Booster Station License.” (6) FCC Form 319, “Application for a Low Power FM Broadcast...

  16. 47 CFR 73.3536 - Application for license to cover construction permit.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Low Power TV, TV Translator or TV Booster Station License.” (5) FCC Form 350, “Application for an FM Translator or FM Booster Station License.” (6) FCC Form 319, “Application for a Low Power FM Broadcast...

  17. Conceptual Design of the Chornobyl New Safe Confinement - an Overview

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kulishenko, Valery N.; Hogg, Charles; Schmieman, Eric A.

    2006-05-01

    The Object Shelter, constructed over the Chornobyl nuclear power plant that was destroyed by a 1986 accident, is at risk of collapse. The Consortium of Bechtel, Electricité De France, and Battelle, in cooperation with subcontractor КСК, recently completed the conceptual design for a New Safe Confinement (NSC) building to reduce Shelter corrosion, to mitigate the consequences of potential collapse, and to enable the safe deconstruction of unstable structures. The arch-shaped NSC will be constructed at a distance from the Shelter to minimize radiation exposure to construction workers, and then slid into place over the Shelter. After sliding, cranes and othermore » tools inside the NSC will be remotely operated for deconstruction of the Shelter. The NSC is designed for a 100-year life. Bechtel designed the arch structure and was responsible for project management functions. Electricité De France designed the foundations and designed deconstruction of the Object Shelter unstable elements. Battelle performed safety analyses and environmental impact assessment. КСК (a consortium of КIЕЛ [KIEP], НДIБК [NIISK], and МНТЦ [ISTC]), as a working partner in all aspects of the design and analysis processes, was the Ukrainian licensed engineer for conceptual design. The design is currently being reviewed by Ukrainian regulatory authorities. An open international tender for detailed design and construction is anticipated to be announced by the European Bank for Reconstruction and Development in December, 2003, with two-stage bid evaluation beginning in April, 2004.« less

  18. 47 CFR 90.665 - Authorization, construction and implementation of MTA licenses.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... years from the date of license grant, construct and place into operation a sufficient number of base stations to provide coverage to at least one-third of the population of the MTA; further, each MTA licensee must provide coverage to at least two-thirds of the population of the MTA five years from the date of...

  19. 47 CFR 90.665 - Authorization, construction and implementation of MTA licenses.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... years from the date of license grant, construct and place into operation a sufficient number of base stations to provide coverage to at least one-third of the population of the MTA; further, each MTA licensee must provide coverage to at least two-thirds of the population of the MTA five years from the date of...

  20. 47 CFR 90.665 - Authorization, construction and implementation of MTA licenses.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... years from the date of license grant, construct and place into operation a sufficient number of base stations to provide coverage to at least one-third of the population of the MTA; further, each MTA licensee must provide coverage to at least two-thirds of the population of the MTA five years from the date of...

  1. 47 CFR 90.665 - Authorization, construction and implementation of MTA licenses.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... years from the date of license grant, construct and place into operation a sufficient number of base stations to provide coverage to at least one-third of the population of the MTA; further, each MTA licensee must provide coverage to at least two-thirds of the population of the MTA five years from the date of...

  2. 47 CFR 90.665 - Authorization, construction and implementation of MTA licenses.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... years from the date of license grant, construct and place into operation a sufficient number of base stations to provide coverage to at least one-third of the population of the MTA; further, each MTA licensee must provide coverage to at least two-thirds of the population of the MTA five years from the date of...

  3. 47 CFR 90.767 - Construction and implementation of EA and Regional licenses.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ...) An EA or Regional licensee must construct a sufficient number of base stations (i.e., base stations for land mobile and/or paging operations) to provide coverage to at least one-third of the population... the population of its EA or REAG within ten years of the issuance of its initial license. Licensees...

  4. 47 CFR 90.767 - Construction and implementation of EA and Regional licenses.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ...) An EA or Regional licensee must construct a sufficient number of base stations (i.e., base stations for land mobile and/or paging operations) to provide coverage to at least one-third of the population... the population of its EA or REAG within ten years of the issuance of its initial license. Licensees...

  5. 47 CFR 90.767 - Construction and implementation of EA and Regional licenses.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ...) An EA or Regional licensee must construct a sufficient number of base stations (i.e., base stations for land mobile and/or paging operations) to provide coverage to at least one-third of the population... the population of its EA or REAG within ten years of the issuance of its initial license. Licensees...

  6. Development of a domain-specific genetic language to design Chlamydomonas reinhardtii expression vectors.

    PubMed

    Wilson, Mandy L; Okumoto, Sakiko; Adam, Laura; Peccoud, Jean

    2014-01-15

    Expression vectors used in different biotechnology applications are designed with domain-specific rules. For instance, promoters, origins of replication or homologous recombination sites are host-specific. Similarly, chromosomal integration or viral delivery of an expression cassette imposes specific structural constraints. As de novo gene synthesis and synthetic biology methods permeate many biotechnology specialties, the design of application-specific expression vectors becomes the new norm. In this context, it is desirable to formalize vector design strategies applicable in different domains. Using the design of constructs to express genes in the chloroplast of Chlamydomonas reinhardtii as an example, we show that a vector design strategy can be formalized as a domain-specific language. We have developed a graphical editor of context-free grammars usable by biologists without prior exposure to language theory. This environment makes it possible for biologists to iteratively improve their design strategies throughout the course of a project. It is also possible to ensure that vectors designed with early iterations of the language are consistent with the latest iteration of the language. The context-free grammar editor is part of the GenoCAD application. A public instance of GenoCAD is available at http://www.genocad.org. GenoCAD source code is available from SourceForge and licensed under the Apache v2.0 open source license.

  7. Health physics aspects of advanced reactor licensing reviews

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hinson, C.S.

    1995-03-01

    The last Construction Permit to be issued by the U.S. Nuclear Regulatory Commission (NRC) for a U.S. light water reactor (LWR) was granted in the late 1970s. In 1989 the NRC issued 10 CFR Part 52 which is intended to serve as a framework for the licensing of future reactor designs. The NRC is currently reviewing four different future on {open_quotes}next-generation{close_quotes} reactor designs. Two of these designs are classified as evolutionary designs (modified versions of current generation LWRs) and two are advanced designs (reactors incorporating simplified designs and passive means for accident mitigation). These {open_quotes}next-generation{close_quotes} reactor designs incorporate many innovativemore » design features which are intended to maintain personnel doses ALARA and ensure that the annual average collective dose at these reactors does not exceed 100 person-rems (1 person-sievert) per year. This paper discusses some of the ALARA design features which are incorporated in the four {open_quotes}next-generation{close_quotes} reactor designs incorporate many innovative design features which are intended to maintain personnel doses ALARA and ensure that the annual average collective dose at these reactors does not exceed 100 person-rems (1 person-sievert) per year. This paper discusses some of the ALARA design features which are incorporated in the four {open_quotes}next-generation{close_quotes} reactor designs currently being reviewed by the NRC.« less

  8. The Fundamentals and Status of Nuclear Power

    NASA Astrophysics Data System (ADS)

    Matzie, Regis A.

    2011-11-01

    Nuclear power has enormous potential to provide clean, safe base-load electricity to the world's growing population. Harnessing this potential in an economic and responsible manner is not without challenges. Safety remains the principal tenet of our operating fleet, which currently provides ˜20% of U.S. electricity generated. The performance of this fleet from economic and safety standpoints has improved dramatically over the past several decades. This nuclear generation also represents greater than 70% of the emission free electricity with hydroelectric power providing the majority of the remainder. There have been many lessons learned from the more than 50 years of experience with nuclear power and these have been factored into the new designs now being constructed worldwide. These new designs, which have enhanced safety compared to the operating fleet, have been simplified by employing passive safety systems and modular construction. There are applications for licenses of more than 20 new reactors under review by the U.S. Nuclear Regulatory Commission; the first of these licenses will be completed in early 2012, and the first new U.S. reactor will start operating in 2016. Yet there are still more improvements that can be made and these are being pursued to achieve an even greater deployment of nuclear power technology.

  9. 10 CFR 60.22 - Filing and distribution of application.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... GEOLOGIC REPOSITORIES Licenses License Applications § 60.22 Filing and distribution of application. (a) An application for a construction authorization for a high-level radioactive waste repository at a geologic repository operations area, and an application for a license to receive and possess source, special nuclear...

  10. 77 FR 29701 - Impact of Construction (Under a Combined License) of New Nuclear Power Plant Units on Operating...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-18

    ... New Nuclear Power Plant Units on Operating Units at Multi-Unit Sites AGENCY: Nuclear Regulatory... construct and operate new nuclear power plants (NPPs) on multi-unit sites to provide an evaluation of the... License) of New Nuclear Power Plants on Operating Units at Multi-Unit Sites (Package). ML112630039 Federal...

  11. 10 CFR 50.34 - Contents of applications; technical information.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... of ten. The manufacturing license will require the plant design to be updated no later than 5 years..., each applicant for a design certification, design approval, combined license, or manufacturing license... Section 50.34 Energy NUCLEAR REGULATORY COMMISSION DOMESTIC LICENSING OF PRODUCTION AND UTILIZATION...

  12. 10 CFR 50.55 - Conditions of construction permits, early site permits, combined licenses, and manufacturing...

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ..., combined licenses, and manufacturing licenses. 50.55 Section 50.55 Energy NUCLEAR REGULATORY COMMISSION... experimental nature of the facility or fire, flood, explosion, strike, sabotage, domestic violence, enemy... submitted to the Document Control Desk, U.S. Nuclear Regulatory Commission, by an appropriate method listed...

  13. 10 CFR 50.55 - Conditions of construction permits, early site permits, combined licenses, and manufacturing...

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ..., combined licenses, and manufacturing licenses. 50.55 Section 50.55 Energy NUCLEAR REGULATORY COMMISSION... experimental nature of the facility or fire, flood, explosion, strike, sabotage, domestic violence, enemy... submitted to the Document Control Desk, U.S. Nuclear Regulatory Commission, by an appropriate method listed...

  14. 10 CFR 50.55 - Conditions of construction permits, early site permits, combined licenses, and manufacturing...

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ..., combined licenses, and manufacturing licenses. 50.55 Section 50.55 Energy NUCLEAR REGULATORY COMMISSION... experimental nature of the facility or fire, flood, explosion, strike, sabotage, domestic violence, enemy... submitted to the Document Control Desk, U.S. Nuclear Regulatory Commission, by an appropriate method listed...

  15. 23 CFR 635.110 - Licensing and qualification of contractors.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... TRAFFIC OPERATIONS CONSTRUCTION AND MAINTENANCE Contract Procedures § 635.110 Licensing and qualification... licensing contractors, who may bid for, be awarded, or perform Federal-aid highway contracts, shall be... of a bid or before the bid may be considered for award of a contract. This, however, is not intended...

  16. 47 CFR 90.1207 - Licensing.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... license gives the licensee authority to construct and operate any number of base stations anywhere within the area authorized by the license, except as follows: (1) A station is required to be individually... assessment is required under § 1.1307 of this chapter; or (iii) The station would affect areas identified in...

  17. 78 FR 48724 - Virgil C. Summer Nuclear Station, Units 2 and 3; South Carolina Electric and Gas; Change to the...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-09

    ...The U.S. Nuclear Regulatory Commission (NRC) is granting an exemption to allow a departure from the certification information of Tier 1 of the generic design control document (DCD) and issuing License Amendment No. 7 to Combined Licenses (COL), NPF-93 and NPF-94. The COLs were issued to South Carolina Electric and Gas (SCE&G) and South Carolina Public Service Authority (Santee Cooper) (the licensee), for construction and operation of the Virgil C. Summer Nuclear Station (VCSNS), Units 2 and 3 located in Fairfield County, South Carolina. The amendment changes requested revise the design of the bracing used to support the Turbine Building structure. This request requires changing Tier 1 information found in the Design Description portion of Updated Final Safety Analysis Report (UFSAR) section 3.3, ``Buildings.'' The granting of the exemption allows the changes to Tier 1 information asked for in the amendment. Because the acceptability of the exemption was determined in part by the acceptability of the amendment, the exemption and amendment are being issued concurrently.

  18. 78 FR 45990 - Vogtle Electric Generating Station, Units 3 and 4; Southern Nuclear Operating Company; Change to...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-30

    ...The U.S. Nuclear Regulatory Commission (NRC) is granting both an exemption to allow a departure from the certification information of Tier 1 of the generic design control document (DCD) and is issuing License Amendment No. 8 to Combined Licenses (COL), NPF-91 and NPF-92. The COLs were issued to Southern Nuclear Operating Company, Inc., and Georgia Power Company, Oglethorpe Power Corporation, Municipal Electric Authority of Georgia, and the City of Dalton, Georgia (the licensee); for construction and operation of the Vogtle Electric Generating Plant (VEGP), Units 3 and 4, located in Burke County, Georgia. The amendment requests to revise the design of the bracing used to support the Turbine Building structure. This request requires changing Tier 1 information found in the Design Description portion of Updated Final Safety Analysis Report (UFSAR) Section 3.3, ``Buildings.'' The granting of the exemption allows the changes to Tier 1 information asked for in the amendment. Because the acceptability of the exemption was determined in part by the acceptability of the amendment, the exemption and amendment are being issued concurrently.

  19. 10 CFR 52.98 - Finality of combined licenses; information requests.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... condition of the combined license, the design of the facility, the inspections, tests, analyses, and acceptance criteria contained in the license which are not derived from a referenced standard design... chapter, as applicable. (b) If the combined license does not reference a design certification or a reactor...

  20. 10 CFR 52.98 - Finality of combined licenses; information requests.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... condition of the combined license, the design of the facility, the inspections, tests, analyses, and acceptance criteria contained in the license which are not derived from a referenced standard design... chapter, as applicable. (b) If the combined license does not reference a design certification or a reactor...

  1. 10 CFR 52.98 - Finality of combined licenses; information requests.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... condition of the combined license, the design of the facility, the inspections, tests, analyses, and acceptance criteria contained in the license which are not derived from a referenced standard design... chapter, as applicable. (b) If the combined license does not reference a design certification or a reactor...

  2. 10 CFR 52.98 - Finality of combined licenses; information requests.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... condition of the combined license, the design of the facility, the inspections, tests, analyses, and acceptance criteria contained in the license which are not derived from a referenced standard design... chapter, as applicable. (b) If the combined license does not reference a design certification or a reactor...

  3. 10 CFR 52.98 - Finality of combined licenses; information requests.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... condition of the combined license, the design of the facility, the inspections, tests, analyses, and acceptance criteria contained in the license which are not derived from a referenced standard design... chapter, as applicable. (b) If the combined license does not reference a design certification or a reactor...

  4. 10 CFR 2.627 - Partial decision on site suitability issues in combined license proceeding.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... license proceeding. 2.627 Section 2.627 Energy NUCLEAR REGULATORY COMMISSION RULES OF PRACTICE FOR... License To Construct Certain Utilization Facilities; and Advance Issuance of Limited Work Authorizations... accordance with this subpart. A limited work authorization may not be issued under 10 CFR 50.10(e) and no...

  5. The importance of context in logic model construction for a multi-site community-based Aboriginal driver licensing program.

    PubMed

    Cullen, Patricia; Clapham, Kathleen; Byrne, Jake; Hunter, Kate; Senserrick, Teresa; Keay, Lisa; Ivers, Rebecca

    2016-08-01

    Evidence indicates that Aboriginal people are underrepresented among driver licence holders in New South Wales, which has been attributed to licensing barriers for Aboriginal people. The Driving Change program was developed to provide culturally responsive licensing services that engage Aboriginal communities and build local capacity. This paper outlines the formative evaluation of the program, including logic model construction and exploration of contextual factors. Purposive sampling was used to identify key informants (n=12) from a consultative committee of key stakeholders and program staff. Semi-structured interviews were transcribed and thematically analysed. Data from interviews informed development of the logic model. Participants demonstrated high level of support for the program and reported that it filled an important gap. The program context revealed systemic barriers to licensing that were correspondingly targeted by specific program outputs in the logic model. Addressing underlying assumptions of the program involved managing local capacity and support to strengthen implementation. This formative evaluation highlights the importance of exploring program context as a crucial first step in logic model construction. The consultation process assisted in clarifying program goals and ensuring that the program was responding to underlying systemic factors that contribute to inequitable licensing access for Aboriginal people. Copyright © 2016 Elsevier Ltd. All rights reserved.

  6. 18 CFR 12.2 - Rules of construction.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ..., DEPARTMENT OF ENERGY REGULATIONS UNDER THE FEDERAL POWER ACT SAFETY OF WATER POWER PROJECTS AND PROJECT WORKS... Licensing determines that compliance with the relevant provision of the license will better protect life...

  7. SynBioSS-aided design of synthetic biological constructs.

    PubMed

    Kaznessis, Yiannis N

    2011-01-01

    We present walkthrough examples of using SynBioSS to design, model, and simulate synthetic gene regulatory networks. SynBioSS stands for Synthetic Biology Software Suite, a platform that is publicly available with Open Licenses at www.synbioss.org. An important aim of computational synthetic biology is the development of a mathematical modeling formalism that is applicable to a wide variety of simple synthetic biological constructs. SynBioSS-based modeling of biomolecular ensembles that interact away from the thermodynamic limit and not necessarily at steady state affords for a theoretical framework that is generally applicable to known synthetic biological systems, such as bistable switches, AND gates, and oscillators. Here, we discuss how SynBioSS creates links between DNA sequences and targeted dynamic phenotypes of these simple systems. Copyright © 2011 Elsevier Inc. All rights reserved.

  8. Empowering Non-Licensed-in-English Language Teachers to Construct Professional Knowledge in Their Actual and Imagined Communities of Practice

    ERIC Educational Resources Information Center

    Aguirre-Garzón, Edgar Augusto; Castañeda-Peña, Harold Andrés

    2017-01-01

    Research has accumulated important knowledge over recent decades on how licensed language teachers develop and learn from cognitive and socio-cultural stances. Yet, relatively little evidence exists on how non-licensed-in-English language teachers (NLELTs) grow professionally in their communities. Similarly, few studies have yet investigated the…

  9. 10 CFR 140.94 - Appendix D-Form of indemnity agreement with Federal agencies.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... (hereinafter referred to as the Act). Article I As used in this agreement, 1. Nuclear reactor, byproduct... irradiated or to be irradiated by, the nuclear reactor or reactors subject to the license or licenses... construction of a nuclear reactor with respect to which no operating license has been issued by the Nuclear...

  10. Updating Human Factors Engineering Guidelines for Conducting Safety Reviews of Nuclear Power Plants

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    O, J.M.; Higgins, J.; Stephen Fleger - NRC

    The U.S. Nuclear Regulatory Commission (NRC) reviews the human factors engineering (HFE) programs of applicants for nuclear power plant construction permits, operating licenses, standard design certifications, and combined operating licenses. The purpose of these safety reviews is to help ensure that personnel performance and reliability are appropriately supported. Detailed design review procedures and guidance for the evaluations is provided in three key documents: the Standard Review Plan (NUREG-0800), the HFE Program Review Model (NUREG-0711), and the Human-System Interface Design Review Guidelines (NUREG-0700). These documents were last revised in 2007, 2004 and 2002, respectively. The NRC is committed to the periodicmore » update and improvement of the guidance to ensure that it remains a state-of-the-art design evaluation tool. To this end, the NRC is updating its guidance to stay current with recent research on human performance, advances in HFE methods and tools, and new technology being employed in plant and control room design. This paper describes the role of HFE guidelines in the safety review process and the content of the key HFE guidelines used. Then we will present the methodology used to develop HFE guidance and update these documents, and describe the current status of the update program.« less

  11. Human Factors Engineering Program Review Model (NUREG-0711)Revision 3: Update Methodology and Key Revisions

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    OHara J. M.; Higgins, J.; Fleger, S.

    The U.S. Nuclear Regulatory Commission (NRC) reviews the human factors engineering (HFE) programs of applicants for nuclear power plant construction permits, operating licenses, standard design certifications, and combined operating licenses. The purpose of these safety reviews is to help ensure that personnel performance and reliability are appropriately supported. Detailed design review procedures and guidance for the evaluations is provided in three key documents: the Standard Review Plan (NUREG-0800), the HFE Program Review Model (NUREG-0711), and the Human-System Interface Design Review Guidelines (NUREG-0700). These documents were last revised in 2007, 2004 and 2002, respectively. The NRC is committed to the periodicmore » update and improvement of the guidance to ensure that it remains a state-of-the-art design evaluation tool. To this end, the NRC is updating its guidance to stay current with recent research on human performance, advances in HFE methods and tools, and new technology being employed in plant and control room design. NUREG-0711 is the first document to be addressed. We present the methodology used to update NUREG-0711 and summarize the main changes made. Finally, we discuss the current status of the update program and the future plans.« less

  12. FY 2017-Progress Report on the Design and Construction of the Sodium Loop SMT-3

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Natesan, K.; Momozaki, Y.

    This report provides an update on the design of a forced-convection sodium loop to be used for the evaluation of sodium compatibility of advanced Alloy 709 with emphasis on long term exposures of tensile, creep, fatigue, creep fatigue, and fracture toughness ASTM-size specimens in support of ASME Code qualification and NRC licensing. The report is a deliverable (Level 4) in FY17 (M4AT-17AN1602094), under the Work Package AT-17AN160209, “Sodium Compatibility” performed by Argonne National Laboratory (ANL), as part of the Advanced Materials Program for the Advanced Reactor Technology. This work package enables the development of advanced structural materials by providing corrosion,more » microstructure, and mechanical property data from the standpoint of sodium compatibility of advanced structural alloys. The first sodium loop (SMT-1) with a single tank was constructed in 2011 at ANL and has been in operation for exposure of subsize sheet specimens of advanced alloys at a single temperature. The second sodium loop with dual tanks (SMT-2) was constructed in 2013 and has been in operation for the exposure of subsize sheet specimens of advanced alloys at two different temperatures. The current loop (SMT-3) has been designed to incorporate sufficient chamber capacity to expose a large number of ASTM-size specimens to evaluate the sodium effects on tensile, creep, fatigue, creep-fatigue, and fracture toughness properties, in support of ASME Code Qualification and USNRC Licensing. The design of individual components for the third sodium loop SMT-3 is almost complete. The design also has been sent to an outside vendor for piping analysis to be in compliance with ASME Code. A purchase order has been placed with an outside vendor for the fabrication of major components such as the specimen exposure tanks. However, we have contracted with another vendor to establish the piping design in compliance with ASME design codes. The piping design was completed in FY2017 and the information is being transmitted to the tank fabricator. The SMT-3 loop will be located in Building 206 adjacent to the currently operating SMT-2 loop. In addition, we have demolished the aged power supply system in Building 206 and installed a new transformer, wiring, and power panels for the new loop. Procurement of some of the long lead items such as valves, EM pumps, EM flowmeters, etc. is in progress and will continue in FY 2018. The construction of components such as cold trap, economizers, piping arrangement etc. will be performed in the central shops at ANL. About 150 liters of sodium for the loop will be procured in early FY2018. The loop system is designed to circulate sodium through the sample tanks and the associated loop without an operator for an extended period of time. With the three sodium loops (with single-tank, dual-tank and four–tanks), materials can be tested at different sodium temperatures, and large tensile, creep, fatigue, creep-fatigue, and fracture toughness specimens can be exposed to sodium for extended periods of time and generate data on mechanical properties in support of ASME Code Qualification and USNRC Licensing of advanced Alloy 709 for use as a structural material in SFRs.« less

  13. 10 CFR 63.31 - Construction authorization.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 2 2011-01-01 2011-01-01 false Construction authorization. 63.31 Section 63.31 Energy... REPOSITORY AT YUCCA MOUNTAIN, NEVADA Licenses Construction Authorization § 63.31 Construction authorization... part, the Commission may authorize construction of a geologic repository operations area at the Yucca...

  14. 10 CFR 60.31 - Construction authorization.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 10 Energy 2 2012-01-01 2012-01-01 false Construction authorization. 60.31 Section 60.31 Energy... REPOSITORIES Licenses Construction Authorization § 60.31 Construction authorization. Upon review and... authorize construction if it determines: (a) Safety. That there is reasonable assurance that the types and...

  15. 10 CFR 60.31 - Construction authorization.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 2 2011-01-01 2011-01-01 false Construction authorization. 60.31 Section 60.31 Energy... REPOSITORIES Licenses Construction Authorization § 60.31 Construction authorization. Upon review and... authorize construction if it determines: (a) Safety. That there is reasonable assurance that the types and...

  16. 47 CFR 90.709 - Special limitations on amendment of applications and on assignment or transfer of authorizations...

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... as the applicant; (2) Any application to assign or transfer a license for a Phase I, non-nationwide... assign a license for a Phase I nationwide system before the licensee has constructed at least 40 percent... request to amend an application or to transfer or assign a license does not involve a substantial change...

  17. 47 CFR 90.709 - Special limitations on amendment of applications and on assignment or transfer of authorizations...

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... as the applicant; (2) Any application to assign or transfer a license for a Phase I, non-nationwide... assign a license for a Phase I nationwide system before the licensee has constructed at least 40 percent... request to amend an application or to transfer or assign a license does not involve a substantial change...

  18. 33 CFR Appendix B to Part 221 - Federal Energy Regulatory Commission Form L-3 (Revised October 1975)

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... license for constructed major project affecting navigable waters of the united states Article 1. The..., terms, and conditions of the license. Article 2. No substantial change shall be made in the maps, plans... theretofore made a part of the license as may be specified by the Commission. Article 3. The project area and...

  19. 10 CFR 60.31 - Construction authorization.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 10 Energy 2 2014-01-01 2014-01-01 false Construction authorization. 60.31 Section 60.31 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) DISPOSAL OF HIGH-LEVEL RADIOACTIVE WASTES IN GEOLOGIC REPOSITORIES Licenses Construction Authorization § 60.31 Construction authorization. Upon review and...

  20. 10 CFR 60.31 - Construction authorization.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 10 Energy 2 2013-01-01 2013-01-01 false Construction authorization. 60.31 Section 60.31 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) DISPOSAL OF HIGH-LEVEL RADIOACTIVE WASTES IN GEOLOGIC REPOSITORIES Licenses Construction Authorization § 60.31 Construction authorization. Upon review and...

  1. 18 CFR 4.202 - Alteration and extension of license.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ..., EXEMPTIONS, AND DETERMINATION OF PROJECT COSTS Application for Amendment of License § 4.202 Alteration and... construction of project works must be filed with the Commission not less than three months prior to the date or...

  2. 18 CFR 4.202 - Alteration and extension of license.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ..., EXEMPTIONS, AND DETERMINATION OF PROJECT COSTS Application for Amendment of License § 4.202 Alteration and... construction of project works must be filed with the Commission not less than three months prior to the date or...

  3. 18 CFR 4.202 - Alteration and extension of license.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ..., EXEMPTIONS, AND DETERMINATION OF PROJECT COSTS Application for Amendment of License § 4.202 Alteration and... construction of project works must be filed with the Commission not less than three months prior to the date or...

  4. 18 CFR 4.202 - Alteration and extension of license.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ..., EXEMPTIONS, AND DETERMINATION OF PROJECT COSTS Application for Amendment of License § 4.202 Alteration and... construction of project works must be filed with the Commission not less than three months prior to the date or...

  5. 18 CFR 4.202 - Alteration and extension of license.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ..., EXEMPTIONS, AND DETERMINATION OF PROJECT COSTS Application for Amendment of License § 4.202 Alteration and... construction of project works must be filed with the Commission not less than three months prior to the date or...

  6. 47 CFR 101.1325 - Construction requirements.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 47 Telecommunication 5 2012-10-01 2012-10-01 false Construction requirements. 101.1325 Section 101... FIXED MICROWAVE SERVICES Multiple Address Systems System Requirements § 101.1325 Construction requirements. (a) Incumbent and site-based licenses are subject to the construction requirements set forth in...

  7. 47 CFR 101.1325 - Construction requirements.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 47 Telecommunication 5 2014-10-01 2014-10-01 false Construction requirements. 101.1325 Section 101... FIXED MICROWAVE SERVICES Multiple Address Systems System Requirements § 101.1325 Construction requirements. (a) Incumbent and site-based licenses are subject to the construction requirements set forth in...

  8. 10 CFR 60.33 - Amendment of construction authorization.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 2 2010-01-01 2010-01-01 false Amendment of construction authorization. 60.33 Section 60.33 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) DISPOSAL OF HIGH-LEVEL RADIOACTIVE WASTES IN GEOLOGIC REPOSITORIES Licenses Construction Authorization § 60.33 Amendment of construction authorization...

  9. 10 CFR 60.32 - Conditions of construction authorization.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 2 2011-01-01 2011-01-01 false Conditions of construction authorization. 60.32 Section 60.32 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) DISPOSAL OF HIGH-LEVEL RADIOACTIVE WASTES IN GEOLOGIC REPOSITORIES Licenses Construction Authorization § 60.32 Conditions of construction authorization...

  10. 10 CFR 60.33 - Amendment of construction authorization.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 2 2011-01-01 2011-01-01 false Amendment of construction authorization. 60.33 Section 60.33 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) DISPOSAL OF HIGH-LEVEL RADIOACTIVE WASTES IN GEOLOGIC REPOSITORIES Licenses Construction Authorization § 60.33 Amendment of construction authorization...

  11. 10 CFR 60.33 - Amendment of construction authorization.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 10 Energy 2 2012-01-01 2012-01-01 false Amendment of construction authorization. 60.33 Section 60.33 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) DISPOSAL OF HIGH-LEVEL RADIOACTIVE WASTES IN GEOLOGIC REPOSITORIES Licenses Construction Authorization § 60.33 Amendment of construction authorization...

  12. 10 CFR 60.32 - Conditions of construction authorization.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 10 Energy 2 2014-01-01 2014-01-01 false Conditions of construction authorization. 60.32 Section 60.32 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) DISPOSAL OF HIGH-LEVEL RADIOACTIVE WASTES IN GEOLOGIC REPOSITORIES Licenses Construction Authorization § 60.32 Conditions of construction authorization...

  13. 10 CFR 63.31 - Construction authorization.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 10 Energy 2 2013-01-01 2013-01-01 false Construction authorization. 63.31 Section 63.31 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) DISPOSAL OF HIGH-LEVEL RADIOACTIVE WASTES IN A GEOLOGIC REPOSITORY AT YUCCA MOUNTAIN, NEVADA Licenses Construction Authorization § 63.31 Construction authorization...

  14. 10 CFR 60.32 - Conditions of construction authorization.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 10 Energy 2 2012-01-01 2012-01-01 false Conditions of construction authorization. 60.32 Section 60.32 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) DISPOSAL OF HIGH-LEVEL RADIOACTIVE WASTES IN GEOLOGIC REPOSITORIES Licenses Construction Authorization § 60.32 Conditions of construction authorization...

  15. 10 CFR 60.32 - Conditions of construction authorization.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 10 Energy 2 2013-01-01 2013-01-01 false Conditions of construction authorization. 60.32 Section 60.32 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) DISPOSAL OF HIGH-LEVEL RADIOACTIVE WASTES IN GEOLOGIC REPOSITORIES Licenses Construction Authorization § 60.32 Conditions of construction authorization...

  16. 10 CFR 60.33 - Amendment of construction authorization.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 10 Energy 2 2014-01-01 2014-01-01 false Amendment of construction authorization. 60.33 Section 60.33 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) DISPOSAL OF HIGH-LEVEL RADIOACTIVE WASTES IN GEOLOGIC REPOSITORIES Licenses Construction Authorization § 60.33 Amendment of construction authorization...

  17. 10 CFR 63.31 - Construction authorization.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 10 Energy 2 2014-01-01 2014-01-01 false Construction authorization. 63.31 Section 63.31 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) DISPOSAL OF HIGH-LEVEL RADIOACTIVE WASTES IN A GEOLOGIC REPOSITORY AT YUCCA MOUNTAIN, NEVADA Licenses Construction Authorization § 63.31 Construction authorization...

  18. 10 CFR 63.31 - Construction authorization.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 2 2010-01-01 2010-01-01 false Construction authorization. 63.31 Section 63.31 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) DISPOSAL OF HIGH-LEVEL RADIOACTIVE WASTES IN A GEOLOGIC REPOSITORY AT YUCCA MOUNTAIN, NEVADA Licenses Construction Authorization § 63.31 Construction authorization...

  19. 10 CFR 60.33 - Amendment of construction authorization.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 10 Energy 2 2013-01-01 2013-01-01 false Amendment of construction authorization. 60.33 Section 60.33 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) DISPOSAL OF HIGH-LEVEL RADIOACTIVE WASTES IN GEOLOGIC REPOSITORIES Licenses Construction Authorization § 60.33 Amendment of construction authorization...

  20. ADVANCED SEISMIC BASE ISOLATION METHODS FOR MODULAR REACTORS

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    E. Blanford; E. Keldrauk; M. Laufer

    2010-09-20

    Advanced technologies for structural design and construction have the potential for major impact not only on nuclear power plant construction time and cost, but also on the design process and on the safety, security and reliability of next generation of nuclear power plants. In future Generation IV (Gen IV) reactors, structural and seismic design should be much more closely integrated with the design of nuclear and industrial safety systems, physical security systems, and international safeguards systems. Overall reliability will be increased, through the use of replaceable and modular equipment, and through design to facilitate on-line monitoring, in-service inspection, maintenance, replacement,more » and decommissioning. Economics will also receive high design priority, through integrated engineering efforts to optimize building arrangements to minimize building heights and footprints. Finally, the licensing approach will be transformed by becoming increasingly performance based and technology neutral, using best-estimate simulation methods with uncertainty and margin quantification. In this context, two structural engineering technologies, seismic base isolation and modular steel-plate/concrete composite structural walls, are investigated. These technologies have major potential to (1) enable standardized reactor designs to be deployed across a wider range of sites, (2) reduce the impact of uncertainties related to site-specific seismic conditions, and (3) alleviate reactor equipment qualification requirements. For Gen IV reactors the potential for deliberate crashes of large aircraft must also be considered in design. This report concludes that base-isolated structures should be decoupled from the reactor external event exclusion system. As an example, a scoping analysis is performed for a rectangular, decoupled external event shell designed as a grillage. This report also reviews modular construction technology, particularly steel-plate/concrete construction using factory prefabricated structural modules, for application to external event shell and base isolated structures.« less

  1. A549 Cells: Lung Carcinoma Cell Line for Adenovirus | NCI Technology Transfer Center | TTC

    Cancer.gov

    Scientists at the National Cancer Institute have developed a cell line designated A549 that was derived from explanted cultures of human lung cancer tissue. The A549 cell line has been tested under the guidance of the United States Food and Drug Administration (FDA) so, under current Good Manufacturing Practices (GMP), these cells may be suitable for use in manufacturing constructs for use in clinical trials. The National Cancer Institute seeks parties to non-exclusively license this research material.

  2. Code qualification of structural materials for AFCI advanced recycling reactors.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Natesan, K.; Li, M.; Majumdar, S.

    2012-05-31

    This report summarizes the further findings from the assessments of current status and future needs in code qualification and licensing of reference structural materials and new advanced alloys for advanced recycling reactors (ARRs) in support of Advanced Fuel Cycle Initiative (AFCI). The work is a combined effort between Argonne National Laboratory (ANL) and Oak Ridge National Laboratory (ORNL) with ANL as the technical lead, as part of Advanced Structural Materials Program for AFCI Reactor Campaign. The report is the second deliverable in FY08 (M505011401) under the work package 'Advanced Materials Code Qualification'. The overall objective of the Advanced Materials Codemore » Qualification project is to evaluate key requirements for the ASME Code qualification and the Nuclear Regulatory Commission (NRC) approval of structural materials in support of the design and licensing of the ARR. Advanced materials are a critical element in the development of sodium reactor technologies. Enhanced materials performance not only improves safety margins and provides design flexibility, but also is essential for the economics of future advanced sodium reactors. Code qualification and licensing of advanced materials are prominent needs for developing and implementing advanced sodium reactor technologies. Nuclear structural component design in the U.S. must comply with the ASME Boiler and Pressure Vessel Code Section III (Rules for Construction of Nuclear Facility Components) and the NRC grants the operational license. As the ARR will operate at higher temperatures than the current light water reactors (LWRs), the design of elevated-temperature components must comply with ASME Subsection NH (Class 1 Components in Elevated Temperature Service). However, the NRC has not approved the use of Subsection NH for reactor components, and this puts additional burdens on materials qualification of the ARR. In the past licensing review for the Clinch River Breeder Reactor Project (CRBRP) and the Power Reactor Innovative Small Module (PRISM), the NRC/Advisory Committee on Reactor Safeguards (ACRS) raised numerous safety-related issues regarding elevated-temperature structural integrity criteria. Most of these issues remained unresolved today. These critical licensing reviews provide a basis for the evaluation of underlying technical issues for future advanced sodium-cooled reactors. Major materials performance issues and high temperature design methodology issues pertinent to the ARR are addressed in the report. The report is organized as follows: the ARR reference design concepts proposed by the Argonne National Laboratory and four industrial consortia were reviewed first, followed by a summary of the major code qualification and licensing issues for the ARR structural materials. The available database is presented for the ASME Code-qualified structural alloys (e.g. 304, 316 stainless steels, 2.25Cr-1Mo, and mod.9Cr-1Mo), including physical properties, tensile properties, impact properties and fracture toughness, creep, fatigue, creep-fatigue interaction, microstructural stability during long-term thermal aging, material degradation in sodium environments and effects of neutron irradiation for both base metals and weld metals. An assessment of modified versions of Type 316 SS, i.e. Type 316LN and its Japanese version, 316FR, was conducted to provide a perspective for codification of 316LN or 316FR in Subsection NH. Current status and data availability of four new advanced alloys, i.e. NF616, NF616+TMT, NF709, and HT-UPS, are also addressed to identify the R&D needs for their code qualification for ARR applications. For both conventional and new alloys, issues related to high temperature design methodology are described to address the needs for improvements for the ARR design and licensing. Assessments have shown that there are significant data gaps for the full qualification and licensing of the ARR structural materials. Development and evaluation of structural materials require a variety of experimental facilities that have been seriously degraded in the past. The availability and additional needs for the key experimental facilities are summarized at the end of the report. Detailed information covered in each Chapter is given.« less

  3. An ontology based trust verification of software license agreement

    NASA Astrophysics Data System (ADS)

    Lu, Wenhuan; Li, Xiaoqing; Gan, Zengqin; Wei, Jianguo

    2017-08-01

    When we install software or download software, there will show up so big mass document to state the rights and obligations, for which lots of person are not patient to read it or understand it. That would may make users feel distrust for the software. In this paper, we propose an ontology based verification for Software License Agreement. First of all, this work proposed an ontology model for domain of Software License Agreement. The domain ontology is constructed by proposed methodology according to copyright laws and 30 software license agreements. The License Ontology can act as a part of generalized copyright law knowledge model, and also can work as visualization of software licenses. Based on this proposed ontology, a software license oriented text summarization approach is proposed which performances showing that it can improve the accuracy of software licenses summarizing. Based on the summarization, the underline purpose of the software license can be explicitly explored for trust verification.

  4. 77 FR 71454 - Crow Butte Resources, Inc. License SUA-1534, License Amendment To Construct and Operate Marsland...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-30

    ..., Washington, DC 20555-0001. Telephone: 301-415-6563; fax number: 301- 415-5369; email: Thomas[email protected] Regulatory Commission. Annette L. Vietti-Cook, Secretary of the Commission. Attachment 1--General Target...

  5. Atomic Safety and Licensing Board Panel Biennial Report, Fiscal Years 1993--1994. Volume 6

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1995-08-01

    In Fiscal Year 1993, the Atomic Safety and Licensing Board Panel (``the Panel``) handled 30 proceedings. In Fiscal Year 1994, the Panel handled 36 proceedings. The cases addressed issues in the construction, operation, and maintenance of commercial nuclear power reactors and other activities requiring a license form the Nuclear Regulatory Commission. This report sets out the Panel`s caseload during the year and summarizes, highlight, and analyzes how the wide- ranging issues raised in those proceedings were addressed by the Panel`s judges and licensing boards.

  6. Structural Analysis and Design Software

    NASA Technical Reports Server (NTRS)

    1997-01-01

    Collier Research and Development Corporation received a one-of-a-kind computer code for designing exotic hypersonic aircraft called ST-SIZE in the first ever Langley Research Center software copyright license agreement. Collier transformed the NASA computer code into a commercial software package called HyperSizer, which integrates with other Finite Element Modeling and Finite Analysis private-sector structural analysis program. ST-SIZE was chiefly conceived as a means to improve and speed the structural design of a future aerospace plane for Langley Hypersonic Vehicles Office. Including the NASA computer code into HyperSizer has enabled the company to also apply the software to applications other than aerospace, including improved design and construction for offices, marine structures, cargo containers, commercial and military aircraft, rail cars, and a host of everyday consumer products.

  7. 76 FR 56951 - Licenses, Certifications, and Approvals for Materials Licensees

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-15

    ... applicants to take action that would have significant environmental impacts with no NRC oversight or... materials license facility to be prepared and significant environmental impacts to occur without undergoing... permit only limited construction activities and the environmental impacts associated with activities...

  8. 47 CFR 74.1232 - Eligibility and licensing requirements.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Translator Stations and FM Broadcast Booster Stations § 74.1232 Eligibility and licensing requirements. (a... translator station may be issued to any qualified individual, organized group of individuals, broadcast... the installation and operation of the translator are sufficiently sound to assure prompt construction...

  9. 10 CFR 36.15 - Start of construction.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Requirements § 36.15 Start of construction. The applicant may not begin construction of a new irradiator prior... work, purchase of a site, site surveys or soil testing, site preparation, site excavation, construction... license with respect to the requirements of the Atomic Energy Act of 1954, as amended, and rules...

  10. 44 CFR 354.3 - Definitions.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... a commercial nuclear power plant site once every two years in conformance with 44 CFR part 350. EPZ... Protection Agency, Department of Health and Human Services, Department of Interior, Department of Energy...) A license to construct or operate a commercial nuclear power plant; (2) A possession-only license...

  11. 10 CFR 60.3 - License required.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... REGULATORY COMMISSION (CONTINUED) DISPOSAL OF HIGH-LEVEL RADIOACTIVE WASTES IN GEOLOGIC REPOSITORIES General... byproduct material at a geologic repository operations area except as authorized by a license issued by the Commission pursuant to this part. (b) DOE shall not commence construction of a geologic repository operations...

  12. 76 FR 15826 - Fisheries of the Exclusive Economic Zone Off Alaska; Gulf of Alaska License Limitation Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-22

    ... or non-trawl gear designations); and (4) designate the type of vessel operation permitted (i.e., LLP... catcher/processor). The endorsements for specific regulatory areas, gear designations, and vessel operational types are non-severable from the LLP license (i.e., once an LLP license is issued, the components...

  13. Regulatory guidance on soil cover systems

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kane, J.D.

    1991-12-31

    The US Nuclear Regulatory Commission (NRC) in September 1991, completed revisions to 14 sections of the Standard Review Plan (SRP) for the Review of a License Application for a Low-Level Radioactive Waste Disposal Facility. The major purposes of the SRP are to ensure the quality and uniformity of the NRC staff`s safety reviews, and to present a well-defined base from which to evaluate the acceptability of information and data provided in the Safety Analysis Report (SAR) portion of the license application. SRP 3.2, entitled, Design Considerations for Normal and Abnormal/Accident Conditions, was one of the sections that was revised bymore » the NRC staff. This revision was completed to provide additional regulatory guidance on the important considerations that need to be addressed for the proper design and construction of soil cover systems that are to be placed over the LLW. The cover system over the waste is acknowledged to be one of the most important engineered barriers for the long-term stable performance of the disposal facility. The guidance in revised SRP 3.2 summarizes the previous efforts and recommendations of the US Army Corps of Engineers (COE), and a peer review panel on the placement of soil cover systems. NRC published these efforts in NUREG/CR-5432. The discussions in this paper highlight selected recommendations on soil cover issues that the NRC staff considers important for ensuring the safe, long-term performance of the soil cover systems. The development phases to be discussed include: (1) cover design; (2) cover material selection; (3) laboratory and field testing; (4) field placement control and acceptance; and (5) penetrations through the constructed covers.« less

  14. Phase 1 environmental report for the Advanced Neutron Source at Oak Ridge National Laboratory

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Blasing, T.J.; Brown, R.A.; Cada, G.F.

    1992-02-01

    The US Department of Energy (DOE) has proposed the construction and operation of the Advanced Neutron Source (ANS), a 330-MW(f) reactor, at Oak Ridge National Laboratory (ORNL) to support neutron scattering and nuclear physics experiments. ANS would provide a steady-state source of neutrons that are thermalized to produce sources of hot, cold, and very coal neutrons. The use of these neutrons in ANS experiment facilities would be an essential component of national research efforts in basic materials science. Additionally, ANS capabilities would include production of transplutonium isotopes, irradiation of potential fusion and fission reactor materials, activation analysis, and production ofmore » medical and industrial isotopes such as {sup 252}Cf. Although ANS would not require licensing by the US Nuclear Regulatory Commission (NRC), DOE regards the design, construction, and operation of ANS as activities that would produce a licensable facility; that is, DOE is following the regulatory guidelines that NRC would apply if NRC were licensing the facility. Those guidelines include instructions for the preparation of an environmental report (ER), a compilation of available data and preliminary analyses regarding the environmental impacts of nuclear facility construction and operation. The ER, described and outlined in NRC Regulatory Guide 4.2, serves as a background document to facilitate the preparation of environmental impact statements (EISs). Using Regulatory Guide 4.2 as a model, this ANS ER provides analyses and information specific to the ANS site and area that can be adopted (and modified, if necessary) for the ANS EIS. The ER is being prepared in two phases. Phase 1 ER includes many of the data and analyses needed to prepare the EIS but does not include data or analyses of alternate sites or alternate technologies. Phase 2 ER will include the additional data and analyses stipulated by Regulatory Guide 4.2.« less

  15. Skin Problems in Construction

    MedlinePlus

    ... credit: Contains public sector information published by the Health and Safety Executive and licensed under the Open Government Licence v1.0 materials you use at work. Find out more about construction hazards. To receive ...

  16. 42 CFR 431.705 - Licensing authority.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... Nursing Home Administrators § 431.705 Licensing authority. (a) The State licensing program must provide for licensing of nursing home administrators by— (1) The agency designated under the healing arts act...

  17. 77 FR 31859 - Government-Owned Inventions; Availability for Licensing

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-30

    ... licensing in the U.S. in accordance with 35 U.S.C. 207 to achieve expeditious commercialization of results... different tilt angles relative to the electron beam are aligned to compensate for mechanical errors of the... into cancer patients. The instant technology includes CAR constructs with one of three different...

  18. 10 CFR 70.23a - Hearing required for uranium enrichment facility.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 2 2011-01-01 2011-01-01 false Hearing required for uranium enrichment facility. 70.23a... MATERIAL License Applications § 70.23a Hearing required for uranium enrichment facility. The Commission... license for construction and operation of a uranium enrichment facility. The Commission will publish...

  19. 10 CFR 70.23a - Hearing required for uranium enrichment facility.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 10 Energy 2 2012-01-01 2012-01-01 false Hearing required for uranium enrichment facility. 70.23a... MATERIAL License Applications § 70.23a Hearing required for uranium enrichment facility. The Commission... license for construction and operation of a uranium enrichment facility. The Commission will publish...

  20. 10 CFR 70.23a - Hearing required for uranium enrichment facility.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 10 Energy 2 2013-01-01 2013-01-01 false Hearing required for uranium enrichment facility. 70.23a... MATERIAL License Applications § 70.23a Hearing required for uranium enrichment facility. The Commission... license for construction and operation of a uranium enrichment facility. The Commission will publish...

  1. 10 CFR 70.23a - Hearing required for uranium enrichment facility.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 10 Energy 2 2014-01-01 2014-01-01 false Hearing required for uranium enrichment facility. 70.23a... MATERIAL License Applications § 70.23a Hearing required for uranium enrichment facility. The Commission... license for construction and operation of a uranium enrichment facility. The Commission will publish...

  2. Social Construction of Authorized Users in the Digital Age

    ERIC Educational Resources Information Center

    Zhu, Xiaohua; Eschenfelder, Kristin R.

    2010-01-01

    This paper analyzes changes to the definitions of "authorized users" contained in electronic resources licenses and embedded in access control technologies from the mid-1990s to the present. In analyzing changes to the license and technology-based definitions, it tracks shifts in major stakeholders' perceptions of authorized users and…

  3. 10 CFR 70.23a - Hearing required for uranium enrichment facility.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 2 2010-01-01 2010-01-01 false Hearing required for uranium enrichment facility. 70.23a... MATERIAL License Applications § 70.23a Hearing required for uranium enrichment facility. The Commission... license for construction and operation of a uranium enrichment facility. The Commission will publish...

  4. 77 FR 68783 - Prospective Grant of Exclusive License: Veterinary Vaccines for Rift Valley Fever Virus

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-16

    ... Grant of Exclusive License: Veterinary Vaccines for Rift Valley Fever Virus AGENCY: Centers for Disease... territories other than Africa, in the field of use of veterinary vaccines, to practice the inventions listed... precisely defined attenuated vaccine constructs that contain complete deletions of critical virulence...

  5. 77 FR 68783 - Prospective Grant of Co-Exclusive License: Veterinary Vaccines for Rift Valley Fever Virus

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-16

    ... Grant of Co-Exclusive License: Veterinary Vaccines for Rift Valley Fever Virus AGENCY: Centers for... veterinary vaccines, to practice the inventions listed in the patent applications referred to below to... generation of precisely defined attenuated vaccine constructs that contain complete deletions of critical...

  6. 47 CFR 27.14 - Construction requirements; Criteria for renewal.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... May 1, 2011. With respect to initial BRS licenses issued on or after November 6, 2009, the licensee... record for the relevant license period demonstrates that: (1) The renewal applicant has provided... showing must include: (1) A description of its current service in terms of geographic coverage and...

  7. 47 CFR 25.148 - Licensing provisions for the Direct Broadcast Satellite Service.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ...) COMMON CARRIER SERVICES SATELLITE COMMUNICATIONS Applications and Licenses Space Stations § 25.148... contracting for construction of the satellite station(s) within one year of the grant of the authorization. The satellite stations shall also be required to be in operation within six years of the authorization...

  8. 47 CFR 25.148 - Licensing provisions for the Direct Broadcast Satellite Service.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ...) COMMON CARRIER SERVICES SATELLITE COMMUNICATIONS Applications and Licenses Space Stations § 25.148... contracting for construction of the satellite station(s) within one year of the grant of the authorization. The satellite stations shall also be required to be in operation within six years of the authorization...

  9. 47 CFR 25.148 - Licensing provisions for the Direct Broadcast Satellite Service.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ...) COMMON CARRIER SERVICES SATELLITE COMMUNICATIONS Applications and Licenses Space Stations § 25.148... contracting for construction of the satellite station(s) within one year of the grant of the authorization. The satellite stations shall also be required to be in operation within six years of the authorization...

  10. 47 CFR 25.148 - Licensing provisions for the Direct Broadcast Satellite Service.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ...) COMMON CARRIER SERVICES SATELLITE COMMUNICATIONS Applications and Licenses Space Stations § 25.148... contracting for construction of the satellite station(s) within one year of the grant of the authorization. The satellite stations shall also be required to be in operation within six years of the authorization...

  11. 77 FR 39521 - Application for a License To Export Nuclear Reactor Major Components and Equipment

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-03

    ... LLC reactor coolant equipment for four constructing four plant May 14, 2012 pumps with motors, APR1400... Emirates. XR176 monitoring and plant in Braka. 110060011 control equipment, auxiliary equipment and... NUCLEAR REGULATORY COMMISSION Application for a License To Export Nuclear Reactor Major Components...

  12. Regulatory Risk Reduction for Advanced Reactor Technologies – FY2016 Status and Work Plan Summary

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Moe, Wayne Leland

    2016-08-01

    Millions of public and private sector dollars have been invested over recent decades to realize greater efficiency, reliability, and the inherent and passive safety offered by advanced nuclear reactor technologies. However, a major challenge in experiencing those benefits resides in the existing U.S. regulatory framework. This framework governs all commercial nuclear plant construction, operations, and safety issues and is highly large light water reactor (LWR) technology centric. The framework must be modernized to effectively deal with non-LWR advanced designs if those designs are to become part of the U.S energy supply. The U.S. Department of Energy’s (DOE) Advanced Reactor Technologiesmore » (ART) Regulatory Risk Reduction (RRR) initiative, managed by the Regulatory Affairs Department at the Idaho National Laboratory (INL), is establishing a capability that can systematically retire extraneous licensing risks associated with regulatory framework incompatibilities. This capability proposes to rely heavily on the perspectives of the affected regulated community (i.e., commercial advanced reactor designers/vendors and prospective owner/operators) yet remain tuned to assuring public safety and acceptability by regulators responsible for license issuance. The extent to which broad industry perspectives are being incorporated into the proposed framework makes this initiative unique and of potential benefit to all future domestic non-LWR applicants« less

  13. 7 CFR 6.33 - License fee.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... utilizing the electronic software designated for the purpose by the Licensing Authority. (c) If the license... 7 Agriculture 1 2010-01-01 2010-01-01 false License fee. 6.33 Section 6.33 Agriculture Office of... License fee. (a) A fee will be assessed each quota year for each license to defray the Department's costs...

  14. 7 CFR 1724.32 - Inspection and certification of work order construction.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ...) RURAL UTILITIES SERVICE, DEPARTMENT OF AGRICULTURE ELECTRIC ENGINEERING, ARCHITECTURAL SERVICES AND... construction. The provisions of this section apply to all borrower electric system facilities regardless of the... performed within 6 months of the completion of construction, and are performed by a licensed engineer...

  15. 7 CFR 1724.32 - Inspection and certification of work order construction.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ...) RURAL UTILITIES SERVICE, DEPARTMENT OF AGRICULTURE ELECTRIC ENGINEERING, ARCHITECTURAL SERVICES AND... construction. The provisions of this section apply to all borrower electric system facilities regardless of the... performed within 6 months of the completion of construction, and are performed by a licensed engineer...

  16. 10 CFR 63.33 - Amendment of construction authorization.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 10 Energy 2 2012-01-01 2012-01-01 false Amendment of construction authorization. 63.33 Section 63.33 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) DISPOSAL OF HIGH-LEVEL RADIOACTIVE WASTES IN A GEOLOGIC REPOSITORY AT YUCCA MOUNTAIN, NEVADA Licenses Construction Authorization § 63.33 Amendment of...

  17. 10 CFR 63.33 - Amendment of construction authorization.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 10 Energy 2 2014-01-01 2014-01-01 false Amendment of construction authorization. 63.33 Section 63.33 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) DISPOSAL OF HIGH-LEVEL RADIOACTIVE WASTES IN A GEOLOGIC REPOSITORY AT YUCCA MOUNTAIN, NEVADA Licenses Construction Authorization § 63.33 Amendment of...

  18. 10 CFR 63.32 - Conditions of construction authorization.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 10 Energy 2 2013-01-01 2013-01-01 false Conditions of construction authorization. 63.32 Section 63.32 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) DISPOSAL OF HIGH-LEVEL RADIOACTIVE WASTES IN A GEOLOGIC REPOSITORY AT YUCCA MOUNTAIN, NEVADA Licenses Construction Authorization § 63.32 Conditions of...

  19. 10 CFR 63.32 - Conditions of construction authorization.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 10 Energy 2 2012-01-01 2012-01-01 false Conditions of construction authorization. 63.32 Section 63.32 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) DISPOSAL OF HIGH-LEVEL RADIOACTIVE WASTES IN A GEOLOGIC REPOSITORY AT YUCCA MOUNTAIN, NEVADA Licenses Construction Authorization § 63.32 Conditions of...

  20. 10 CFR 63.32 - Conditions of construction authorization.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 2 2011-01-01 2011-01-01 false Conditions of construction authorization. 63.32 Section 63.32 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) DISPOSAL OF HIGH-LEVEL RADIOACTIVE WASTES IN A GEOLOGIC REPOSITORY AT YUCCA MOUNTAIN, NEVADA Licenses Construction Authorization § 63.32 Conditions of...

  1. 10 CFR 63.33 - Amendment of construction authorization.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 10 Energy 2 2013-01-01 2013-01-01 false Amendment of construction authorization. 63.33 Section 63.33 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) DISPOSAL OF HIGH-LEVEL RADIOACTIVE WASTES IN A GEOLOGIC REPOSITORY AT YUCCA MOUNTAIN, NEVADA Licenses Construction Authorization § 63.33 Amendment of...

  2. 10 CFR 63.33 - Amendment of construction authorization.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 2 2011-01-01 2011-01-01 false Amendment of construction authorization. 63.33 Section 63.33 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) DISPOSAL OF HIGH-LEVEL RADIOACTIVE WASTES IN A GEOLOGIC REPOSITORY AT YUCCA MOUNTAIN, NEVADA Licenses Construction Authorization § 63.33 Amendment of...

  3. 10 CFR 63.33 - Amendment of construction authorization.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 2 2010-01-01 2010-01-01 false Amendment of construction authorization. 63.33 Section 63.33 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) DISPOSAL OF HIGH-LEVEL RADIOACTIVE WASTES IN A GEOLOGIC REPOSITORY AT YUCCA MOUNTAIN, NEVADA Licenses Construction Authorization § 63.33 Amendment of...

  4. 10 CFR 63.32 - Conditions of construction authorization.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 10 Energy 2 2014-01-01 2014-01-01 false Conditions of construction authorization. 63.32 Section 63.32 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) DISPOSAL OF HIGH-LEVEL RADIOACTIVE WASTES IN A GEOLOGIC REPOSITORY AT YUCCA MOUNTAIN, NEVADA Licenses Construction Authorization § 63.32 Conditions of...

  5. 10 CFR 51.75 - Draft environmental impact statement-construction permit, early site permit, or combined license.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... required. 5 The impact statement shall take account of dose commitments and health effects from fuel cycle... the site proposed. The draft environmental impact statement must not include an assessment of the... certification environmental assessment, then the draft combined license environmental impact statement shall...

  6. 10 CFR 51.75 - Draft environmental impact statement-construction permit, early site permit, or combined license.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... required. 5 The impact statement shall take account of dose commitments and health effects from fuel cycle... the site proposed. The draft environmental impact statement must not include an assessment of the... certification environmental assessment, then the draft combined license environmental impact statement shall...

  7. 10 CFR 51.75 - Draft environmental impact statement-construction permit, early site permit, or combined license.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... required. 5 The impact statement shall take account of dose commitments and health effects from fuel cycle... the site proposed. The draft environmental impact statement must not include an assessment of the... certification environmental assessment, then the draft combined license environmental impact statement shall...

  8. 47 CFR 27.14 - Construction requirements; Criteria for renewal.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... expectancy, which is the most important comparative factor to be considered in the proceeding, if its past... “substantial” service during its past license term; and (2) The renewal applicant has substantially complied... of each of their license authorizations no later than June 13, 2013 (or within four years of initial...

  9. 47 CFR 25.113 - Station licenses and launch authority.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    .... Construction of such stations may commence prior to grant of a license at the applicant's own risk. Applicants... is required by part 17 of this chapter, must include the FCC Antenna Structure Registration Number(s) for the affected structure(s). If no such number has been assigned at the time the application is...

  10. 76 FR 387 - Atomic Safety and Licensing Board; AREVA Enrichment Services, LLC (Eagle Rock Enrichment Facility)

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-04

    ... and Licensing Board; AREVA Enrichment Services, LLC (Eagle Rock Enrichment Facility) December 17, 2010... construction and operation of a gas centrifuge uranium enrichment facility--denoted as the Eagle Rock... site at http://www.nrc.gov/materials/fuel-cycle-fac/arevanc.html . These and other documents relating...

  11. 47 CFR 73.865 - Assignment and transfer of LPFM licenses.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... transfer an LPFM construction permit at any time. (e) Transfers of control involving a sudden change of... 47 Telecommunication 4 2012-10-01 2012-10-01 false Assignment and transfer of LPFM licenses. 73... SERVICES RADIO BROADCAST SERVICES Low Power FM Broadcast Stations (LPFM) § 73.865 Assignment and transfer...

  12. 10 CFR 50.63 - Loss of all alternating current power.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ..., Limitations, and Conditions of Licenses and Construction Permits § 50.63 Loss of all alternating current power... manufacturing license under part 52 of this chapter must be able to withstand for a specified duration and recover from a station blackout as defined in § 50.2. The specified station blackout duration shall be...

  13. 42 CFR 431.705 - Licensing authority.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Nursing Home Administrators § 431.705 Licensing authority. (a) The State licensing program must provide for licensing of nursing home administrators by— (1) The agency designated under the healing arts act... 42 Public Health 4 2010-10-01 2010-10-01 false Licensing authority. 431.705 Section 431.705 Public...

  14. 77 FR 63897 - Notice of License Terminations for National Aeronautics and Space Administration; Plum Brook...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-17

    ... test reactor, constructed to perform irradiation testing of fueled and unfueled experiments for space... constructed to test ``mock-up'' irradiation components for the Plum Brook Reactor. The reactors operated from...

  15. 7 CFR Appendices 1, 2 and 3 to... - Dairy Tariff-Rate Import Quota Licensing

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 1, 2 and 3 to Subpart Agriculture Office of the Secretary of Agriculture IMPORT QUOTAS AND FEES... and 3 to Subpart—Dairy Tariff-Rate Import Quota Licensing Articles Subject to: Appendix 1, Historical Licenses; Appendix 2, Nonhistorical Licenses; and Appendix 3, Designated Importer Licenses for Quota Year...

  16. 47 CFR 90.767 - Construction and implementation of EA and Regional licenses.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ...) An EA or Regional licensee must construct a sufficient number of base stations (i.e., base stations... all of their base stations or fixed stations. [69 FR 75172, Dec. 15, 2004] ... constructed stations. (d) EA and Regional licensees will not be permitted to count the resale of the services...

  17. 47 CFR 90.769 - Construction and implementation of Phase II nationwide licenses.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    .... (a) A nationwide licensee must construct a sufficient number of base stations (i.e., base stations... their authorized channels at all of their base stations or fixed stations. [69 FR 75173, Dec. 15, 2004] ... will not be converted to individual, site-by-site authorizations for already constructed stations. (d...

  18. 47 CFR 1.2003 - Applications affected.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Wireless Telecommunications Bureau Application for Assignment of Authorization and Transfer of Control; FCC... for Consent to Transfer of Control of Corporation Holding Broadcast Station Construction Permit or... License or Transfer of Control of Corporation Holding Radio Broadcast Station Construction Permit or...

  19. 10 CFR 50.81 - Creditor regulations.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... provided by law. (d) As used in this section: (1) License includes any license under this chapter, any construction permit under this part, and any early site permit under part 52 of this chapter, which may be... limited to, a site which is the subject of an early site permit under subpart A of part 52 of this chapter...

  20. 10 CFR 50.81 - Creditor regulations.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... provided by law. (d) As used in this section: (1) License includes any license under this chapter, any construction permit under this part, and any early site permit under part 52 of this chapter, which may be... limited to, a site which is the subject of an early site permit under subpart A of part 52 of this chapter...

  1. 10 CFR 50.81 - Creditor regulations.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... provided by law. (d) As used in this section: (1) License includes any license under this chapter, any construction permit under this part, and any early site permit under part 52 of this chapter, which may be... limited to, a site which is the subject of an early site permit under subpart A of part 52 of this chapter...

  2. 10 CFR 50.81 - Creditor regulations.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... provided by law. (d) As used in this section: (1) License includes any license under this chapter, any construction permit under this part, and any early site permit under part 52 of this chapter, which may be... limited to, a site which is the subject of an early site permit under subpart A of part 52 of this chapter...

  3. 10 CFR 50.81 - Creditor regulations.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... provided by law. (d) As used in this section: (1) License includes any license under this chapter, any construction permit under this part, and any early site permit under part 52 of this chapter, which may be... limited to, a site which is the subject of an early site permit under subpart A of part 52 of this chapter...

  4. Institutional Power: Identity, Politics, and Lived Experiences in the Dance License via Portfolio Process

    ERIC Educational Resources Information Center

    Maloney, Betsy

    2015-01-01

    In this research study, I examined how institutional power affected the experiences of two dance educators attempting to gain their K-12 dance teaching license in Minnesota. My research analyzed the ways in which candidates applying for the portfolio review process constructed, amended, or abandoned their identities as teachers/artists/individuals…

  5. 78 FR 18360 - Prospective Grant of Start-Up Exclusive License: Manual Device for Constructing Tissue Micro...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-26

    ... DEPARTMENT OF HEALTH AND HUMAN SERVICES National Institutes of Health Prospective Grant of Start..., is contemplating the grant of a start-up exclusive license to practice the inventions embodied in U.S... Cryoarray'' by Star et al. (NIDDK) to Micatu, Inc. having a place of business at 231 West Water Street...

  6. A Post Licensing Study of Community Effects at Two Operating Nuclear Power Plants. Final Report.

    ERIC Educational Resources Information Center

    Purdy, Bruce J.; And Others

    In an effort to identify and assess the social, economic, and political effects of nuclear power plant construction and operation upon two host communities (Plymouth, Massachusetts and Waterford, Connecticut), a post-licensing review revealed that the primary impact of the nuclear power plants in both communities was an increase in the property…

  7. The Experiences of Licensed Mental Health Professionals Who Have Encountered and Navigated through Compassion Fatigue

    ERIC Educational Resources Information Center

    Jorgensen, Louise B.

    2012-01-01

    The purpose of this dissertation study was to increase understanding of licensed mental health professionals' experiences as they have encountered and navigated through compassion fatigue (CF). CF is a complex construct with an attendant constellation of secondary stress responses. In order to examine the complex and varying factors…

  8. 78 FR 9945 - Crow Butte Resources, Inc.; Establishment of Atomic Safety and Licensing Board

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-12

    ... Material License, SUA-1534, to obtain authority to construct and operate an in situ uranium recovery satellite facility at its Marsland site in Dawes County, Nebraska. In response to a ``Notice of Opportunity for a Hearing'' published in the Federal Register, see 77 Fed. Reg. 71,454 (Nov. 30, 2012), hearing...

  9. 78 FR 75379 - Entergy Operations, Inc.; Combined License Application for Grand Gulf Unit 3; Exemption From the...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-11

    ... accidents are increased. Therefore, there is no undue risk to public health and safety. Plant construction... at this time. Based on the nature of the requested exemption as described above, no new accident... a license decision is made, the probability of postulated accidents is not increased. Additionally...

  10. 76 FR 4827 - High-Cost Universal Service Support and Federal-State Joint Board on Universal Service

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-27

    ... Wireless Services (``AWS'') licenses. This auction, which was designated as Auction 78, offered 35 licenses in the AWS 1710-1755 MHz and 2110-2155 MHz bands (``AWS-1''). The AWS-1 licenses were licenses for...

  11. Magnetic Resonance Imaging of Heart Failure Using a Swine Model

    DTIC Science & Technology

    2011-03-21

    Defense or the Uniformed Services University of the Health Sciences. / Ma een N. Hood, MR, RN, RT (R)(MR), FSMRT Gr duate School of Nursing U iformed...2652710212087 License date Apr 19, 2011 Licensed content publisher Wolters Kluwer Health Licensed content publication Journal of Cardiovascular Nursing ...Licensed content title A Review of Cohort Study Design for Cardiovascular Nursing Research Licensed content author Maureen Hood Licensed content date Jan

  12. What variables can influence clinical reasoning?

    PubMed

    Ashoorion, Vahid; Liaghatdar, Mohammad Javad; Adibi, Peyman

    2012-12-01

    Clinical reasoning is one of the most important competencies that a physician should achieve. Many medical schools and licensing bodies try to predict it based on some general measures such as critical thinking, personality, and emotional intelligence. This study aimed at providing a model to design the relationship between the constructs. Sixty-nine medical students participated in this study. A battery test devised that consist four parts: Clinical reasoning measures, personality NEO inventory, Bar-On EQ inventory, and California critical thinking questionnaire. All participants completed the tests. Correlation and multiple regression analysis consumed for data analysis. There is low to moderate correlations between clinical reasoning and other variables. Emotional intelligence is the only variable that contributes clinical reasoning construct (r=0.17-0.34) (R(2) chnage = 0.46, P Value = 0.000). Although, clinical reasoning can be considered as a kind of thinking, no significant correlation detected between it and other constructs. Emotional intelligence (and its subscales) is the only variable that can be used for clinical reasoning prediction.

  13. The Nuclear Renaissance in the U.S.

    ScienceCinema

    Buongiorno, Jacopo

    2018-04-23

    Nuclear power currently provides 20% of the electricity generation in the U.S. and about 16% worldwide.  As a carbon-free energy source, nuclear is receiving a lot of attention by industry, lawmakers and environmental groups, as they attempt to resolve the issue of man-made climate change.  For the first time in 30 years several U.S. electric utilities have applied for construction and operation licenses of new nuclear power plants.  This talk will review the safety, operational and economic record of the existing U.S. commercial reactor fleet, will provide an overview of the reactor designs considered for the new wave of plant construction, and will discuss several research projects being conducted at the Massachusetts Institute of Technology to support the expansion of nuclear power in the U.S. and overseas.

  14. HFE Process Guidance and Standards for potential application to updating NRC guidance

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Jacques Hugo; J. J. Persensky

    2012-07-01

    The U.S. Nuclear Regulatory Commission (NRC) reviews and evaluates the human factors engineering (HFE) programs of applicants for nuclear power plant construction permits, operating licenses, standard design certifications, and combined operating licenses. The purpose of these safety reviews is to help ensure that personnel performance and reliability are appropriately supported. Detailed design review procedures and guidance for the evaluations is provided in three key documents: the Standard Review Plan (NUREG-0800), the HFE Program Review Model (NUREG-0711), and the Human-System Interface Design Review Guidelines (NUREG-0700). These documents were last revised in 2007, 2004 and 2002, respectively. The NRC is committed tomore » the periodic update and improvement of these guidance documents to ensure that they remain state-of-the-art design evaluation tools. Thus, the NRC has initiated a project with BNL to update the NRC guidance to remain current with recent research on human performance, advances in HFE methods and tools, and new technology. INL supported Brookhaven National Lab (BNL) to update the detailed HFE review criteria contained in NUREG-0711 and NUREG-0700 based on (1) feedback obtained from end users, (2) the results of NRC research and development efforts supporting the NRC staff’s HFE safety reviews, and (3) other material the project staff identify as applicable to the update effort. INL submitted comments on development plans and sections of NUREGs 0800, 0711, and 0700. The contractor prepared the report attached here as the deliverable for this work.« less

  15. 77 FR 12087 - Atomic Safety and Licensing Board Panel; Strata Energy, Inc.; Memorandum and Order (Notice of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-28

    ... part 40.\\*\\ If issued, that license would authorize SEI to construct and operate an in situ recovery (ISR) uranium project at the Ross site in Crook County, Wyoming. In response to an October 27, 2011... Commission in its decision in Sequoyah Fuels Corp. (Gore, Oklahoma Site), CLI-03-15, 58 NRC 349 (2003...

  16. 47 CFR 27.14 - Construction requirements; Criteria for renewal.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... at least 40 percent of the license area's population by March 13, 2017, and to at least 75 percent of... a license area by March 13, 2017, and 30 point-to-point links per million persons (one link per 33... minimum of 15 point-to-point links by March 13, 2017, and a minimum of 15 point-to-point links by...

  17. 47 CFR 27.14 - Construction requirements; Criteria for renewal.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ...'s population by March 13, 2017, and to at least 75 percent of the license area's population by...-point links per million persons (one link per 67,000 persons) in a license area by March 13, 2017, and...-point links by March 13, 2017, and a minimum of 15 point-to-point links by September 13, 2019. (4) Under...

  18. 33 CFR 320.3 - Related laws.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... determined by the Secretary charged with its administration. (m) The Ocean Thermal Energy Conversion Act of... of NOAA for the ownership, construction, location, and operation of ocean thermal energy conversion... Energy Regulatory Agency (FERC) to issue licenses for the construction and the operation and maintenance...

  19. Why open drug discovery needs four simple rules for licensing data and models.

    PubMed

    Williams, Antony J; Wilbanks, John; Ekins, Sean

    2012-01-01

    When we look at the rapid growth of scientific databases on the Internet in the past decade, we tend to take the accessibility and provenance of the data for granted. As we see a future of increased database integration, the licensing of the data may be a hurdle that hampers progress and usability. We have formulated four rules for licensing data for open drug discovery, which we propose as a starting point for consideration by databases and for their ultimate adoption. This work could also be extended to the computational models derived from such data. We suggest that scientists in the future will need to consider data licensing before they embark upon re-using such content in databases they construct themselves.

  20. 47 CFR 25.144 - Licensing provisions for the 2.3 GHz satellite digital audio radio service.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... (CONTINUED) COMMON CARRIER SERVICES SATELLITE COMMUNICATIONS Applications and Licenses Space Stations § 25... frequencies and emission designators of such communications, and the frequencies and emission designators used... repeaters will communicate, the frequencies and emission designators of such communications, and the...

  1. 47 CFR 25.144 - Licensing provisions for the 2.3 GHz satellite digital audio radio service.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... (CONTINUED) COMMON CARRIER SERVICES SATELLITE COMMUNICATIONS Applications and Licenses Space Stations § 25... frequencies and emission designators of such communications, and the frequencies and emission designators used... repeaters will communicate, the frequencies and emission designators of such communications, and the...

  2. 47 CFR 25.144 - Licensing provisions for the 2.3 GHz satellite digital audio radio service.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... (CONTINUED) COMMON CARRIER SERVICES SATELLITE COMMUNICATIONS Applications and Licenses Space Stations § 25... frequencies and emission designators of such communications, and the frequencies and emission designators used... repeaters will communicate, the frequencies and emission designators of such communications, and the...

  3. 47 CFR 25.144 - Licensing provisions for the 2.3 GHz satellite digital audio radio service.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... (CONTINUED) COMMON CARRIER SERVICES SATELLITE COMMUNICATIONS Applications and Licenses Space Stations § 25... frequencies and emission designators of such communications, and the frequencies and emission designators used... repeaters will communicate, the frequencies and emission designators of such communications, and the...

  4. Interpreting and Negotiating Licensing Agreements: A Guidebook for the Library, Research, and Teaching Professions.

    ERIC Educational Resources Information Center

    Bielefield, Arlene; Cheeseman, Lawrence

    This guide is designed to help librarians, researchers, and teachers understand and negotiate licensing agreements for electronic resources. Chapter 1 is an introduction to contract law. Chapter 2 describes the various types of licensing agreements, including shrink-wrap, Webwrap, and custom licenses that are negotiated clause-by-clause; examples…

  5. Safety Regulation of Nuclear Power Plant License Renewal

    NASA Astrophysics Data System (ADS)

    Zhang, Qiaoe; Liu, Ting; Qi, Yuan; Yang, LiLi

    2018-01-01

    China’s regulations stipulate that a nuclear power plant license is valid for a design life period (generally 30 or 40 years). Whether the nuclear power plant’s license is renewed after the expiration of the license is to be determined based on the safety and economy of the nuclear power plant..

  6. The use of NUREGs 1199 and 1200 in the Illinois LLW licensing program

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Klinger, J.G.; Harmon, D.F.

    1991-12-31

    This paper will describe how the LLW licensing staff of the Illinois Department of Nuclear Safety used NRC`s NUREG 1199, NUREG 1200, NUREG 1300 and Regulatory Guide 4.18 in its licensing program for reviewing and evaluating a LLW disposal facility license application. The paper will discuss how Illinois guidance documents were prepared based on modifications made to these NRC documents which were necessary to take into account site and facility specific considerations, as well as changes required by Illinois statutes and regulatory codes. The paper will review the recent revisions (January 1991) to NUREG 1199 and 1200 and the importancemore » of these revisions. The paper will also discuss recommended modifications to these NRC documents and provide an update on the status of the Department`s review and evaluation of an application for a license to site, construct and operate a LLW disposal facility in Illinois.« less

  7. 75 FR 54145 - Environmental Impacts Statements; Notice of Availability

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-03

    ... to Construct a Concentrated Solar Thermal Power Plant Facility, Nye County, NV, Comment Period Ends..., GENERIC--License Renewal of Nuclear Plants for Kewaunee Power Station, Supplement 40 to NUREG-1437... EIS, NRC, GA, Vogtle Electric Generating Plant Units 3 and 4, Construction and Operation, Application...

  8. 46 CFR 380.24 - Schedule of retention periods and description of records.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... bonds, salvage data, and claim files; (4) Contracts, agreements, franchises, licenses, etc., such as subsidy, charter, ship construction, and pooling agreements; (5) Vessel operating records such as log... Administration: (1) Ship construction or reconversion records such as bids, plans, progress payments, and...

  9. 46 CFR 380.24 - Schedule of retention periods and description of records.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... bonds, salvage data, and claim files; (4) Contracts, agreements, franchises, licenses, etc., such as subsidy, charter, ship construction, and pooling agreements; (5) Vessel operating records such as log... Administration: (1) Ship construction or reconversion records such as bids, plans, progress payments, and...

  10. 46 CFR 380.24 - Schedule of retention periods and description of records.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... bonds, salvage data, and claim files; (4) Contracts, agreements, franchises, licenses, etc., such as subsidy, charter, ship construction, and pooling agreements; (5) Vessel operating records such as log... Administration: (1) Ship construction or reconversion records such as bids, plans, progress payments, and...

  11. 46 CFR 380.24 - Schedule of retention periods and description of records.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... bonds, salvage data, and claim files; (4) Contracts, agreements, franchises, licenses, etc., such as subsidy, charter, ship construction, and pooling agreements; (5) Vessel operating records such as log... Administration: (1) Ship construction or reconversion records such as bids, plans, progress payments, and...

  12. 46 CFR 380.24 - Schedule of retention periods and description of records.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... bonds, salvage data, and claim files; (4) Contracts, agreements, franchises, licenses, etc., such as subsidy, charter, ship construction, and pooling agreements; (5) Vessel operating records such as log... Administration: (1) Ship construction or reconversion records such as bids, plans, progress payments, and...

  13. 36 CFR 1234.12 - What are the fire safety requirements that apply to records storage facilities?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... records storage facilities? (a) The fire detection and protection systems must be designed or reviewed by a licensed fire protection engineer. If the system was not designed by a licensed fire protection... engineer that describes the design intent of the fire detection and suppression system, detailing the...

  14. 36 CFR 1234.12 - What are the fire safety requirements that apply to records storage facilities?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... records storage facilities? (a) The fire detection and protection systems must be designed or reviewed by a licensed fire protection engineer. If the system was not designed by a licensed fire protection... engineer that describes the design intent of the fire detection and suppression system, detailing the...

  15. Miniature Earthmover

    NASA Technical Reports Server (NTRS)

    1996-01-01

    International Machinery Corporation (IMC) developed a miniature earthmover, the 1/8 scale Caterpillar D11N Track-type Tractor, with trademark product approval and manufacturing/marketing license from Caterpillar, Inc. Through Marshall Space Flight Center assistance, the company has acquired infrared remote control technology, originally developed for space exploration. The technology is necessary for exports because of varying restrictions on radio frequency in foreign countries. The Cat D11N weighs only 340 pounds and has the world's first miniature industrial internal combustion engine. The earthmover's uses include mining, construction and demolition work, and hazardous environment work. IMC also has designs of various products for military use and other Caterpillar replicas.

  16. Driver license testing of young novice drivers : traffic tech.

    DOT National Transportation Integrated Search

    2010-11-01

    Driver license tests are designed to ensure that people using : public roadways have a minimum level of driving skill and : an awareness of safe driving practices and road laws. License : applicants proceed through the administrative processes of : t...

  17. 10 CFR 51.20 - Criteria for and identification of licensing and regulatory actions requiring environmental...

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... design capacity license to operate an isotopic enrichment plant pursuant to part 50 of this chapter. (4... uranium enrichment facility. (11) Issuance of renewal of a license authorizing receipt and disposal of...

  18. Omitted Arguments and Complexity of Predication

    ERIC Educational Resources Information Center

    Port, Martin

    2010-01-01

    This work focuses on the licensing conditions and logical structure of understood-argument constructions, or complement-drop constructions, in English. There are two main types of such arguments: Indefinite Understood Arguments (IUA) and Definite Understood Arguments (DUA). IUA readings occur in such cases in "He ate, He cooked". In such cases,…

  19. 47 CFR 101.527 - Construction requirements for 24 GHz operations.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... it. (d) The frequencies associated with incumbent authorizations, licensed on a SMSA basis, that have... SPECIAL RADIO SERVICES FIXED MICROWAVE SERVICES 24 GHz Service and Digital Electronic Message Service § 101.527 Construction requirements for 24 GHz operations. (a) Each licensee must make a showing of...

  20. 47 CFR 101.527 - Construction requirements for 24 GHz operations.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... it. (d) The frequencies associated with incumbent authorizations, licensed on a SMSA basis, that have... SPECIAL RADIO SERVICES FIXED MICROWAVE SERVICES 24 GHz Service and Digital Electronic Message Service § 101.527 Construction requirements for 24 GHz operations. (a) Each licensee must make a showing of...

  1. 47 CFR 101.527 - Construction requirements for 24 GHz operations.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... it. (d) The frequencies associated with incumbent authorizations, licensed on a SMSA basis, that have... SPECIAL RADIO SERVICES FIXED MICROWAVE SERVICES 24 GHz Service and Digital Electronic Message Service § 101.527 Construction requirements for 24 GHz operations. (a) Each licensee must make a showing of...

  2. 47 CFR 101.527 - Construction requirements for 24 GHz operations.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... it. (d) The frequencies associated with incumbent authorizations, licensed on a SMSA basis, that have... SPECIAL RADIO SERVICES FIXED MICROWAVE SERVICES 24 GHz Service and Digital Electronic Message Service § 101.527 Construction requirements for 24 GHz operations. (a) Each licensee must make a showing of...

  3. 47 CFR 101.527 - Construction requirements for 24 GHz operations.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... it. (d) The frequencies associated with incumbent authorizations, licensed on a SMSA basis, that have... SPECIAL RADIO SERVICES FIXED MICROWAVE SERVICES 24 GHz Service and Digital Electronic Message Service § 101.527 Construction requirements for 24 GHz operations. (a) Each licensee must make a showing of...

  4. 47 CFR 22.143 - Construction prior to grant of application.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... SERVICES PUBLIC MOBILE SERVICES Licensing Requirements and Procedures Applications and Notifications § 22... Mobile services prior to grant of their applications, subject to the provisions of this section, but must... 47 Telecommunication 2 2010-10-01 2010-10-01 false Construction prior to grant of application. 22...

  5. 18 CFR 11.6 - Exemption of State and municipal licensees and exemptees.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    .... (a) Bases for exemption. A State or municipal licensee or exemptee may claim total or partial... State or municipal purposes, such as lighting streets, highways, parks, public buildings, etc., for... profit. (g) Construction period. During the period when the licensed project is under construction and is...

  6. 18 CFR 11.6 - Exemption of State and municipal licensees and exemptees.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    .... (a) Bases for exemption. A State or municipal licensee or exemptee may claim total or partial... State or municipal purposes, such as lighting streets, highways, parks, public buildings, etc., for... profit. (g) Construction period. During the period when the licensed project is under construction and is...

  7. 18 CFR 11.6 - Exemption of State and municipal licensees and exemptees.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    .... (a) Bases for exemption. A State or municipal licensee or exemptee may claim total or partial... State or municipal purposes, such as lighting streets, highways, parks, public buildings, etc., for... profit. (g) Construction period. During the period when the licensed project is under construction and is...

  8. 18 CFR 11.6 - Exemption of State and municipal licensees and exemptees.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    .... (a) Bases for exemption. A State or municipal licensee or exemptee may claim total or partial... State or municipal purposes, such as lighting streets, highways, parks, public buildings, etc., for... profit. (g) Construction period. During the period when the licensed project is under construction and is...

  9. Development of the Statistical Reasoning in Biology Concept Inventory (SRBCI).

    PubMed

    Deane, Thomas; Nomme, Kathy; Jeffery, Erica; Pollock, Carol; Birol, Gülnur

    2016-01-01

    We followed established best practices in concept inventory design and developed a 12-item inventory to assess student ability in statistical reasoning in biology (Statistical Reasoning in Biology Concept Inventory [SRBCI]). It is important to assess student thinking in this conceptual area, because it is a fundamental requirement of being statistically literate and associated skills are needed in almost all walks of life. Despite this, previous work shows that non-expert-like thinking in statistical reasoning is common, even after instruction. As science educators, our goal should be to move students along a novice-to-expert spectrum, which could be achieved with growing experience in statistical reasoning. We used item response theory analyses (the one-parameter Rasch model and associated analyses) to assess responses gathered from biology students in two populations at a large research university in Canada in order to test SRBCI's robustness and sensitivity in capturing useful data relating to the students' conceptual ability in statistical reasoning. Our analyses indicated that SRBCI is a unidimensional construct, with items that vary widely in difficulty and provide useful information about such student ability. SRBCI should be useful as a diagnostic tool in a variety of biology settings and as a means of measuring the success of teaching interventions designed to improve statistical reasoning skills. © 2016 T. Deane et al. CBE—Life Sciences Education © 2016 The American Society for Cell Biology. This article is distributed by The American Society for Cell Biology under license from the author(s). It is available to the public under an Attribution–Noncommercial–Share Alike 3.0 Unported Creative Commons License (http://creativecommons.org/licenses/by-nc-sa/3.0).

  10. The Design and Transformation of Biofundamentals: A Nonsurvey Introductory Evolutionary and Molecular Biology Course.

    PubMed

    Klymkowsky, Michael W; Rentsch, Jeremy D; Begovic, Emina; Cooper, Melanie M

    2016-01-01

    Many introductory biology courses amount to superficial surveys of disconnected topics. Often, foundational observations and the concepts derived from them and students' ability to use these ideas appropriately are overlooked, leading to unrealistic expectations and unrecognized learning obstacles. The result can be a focus on memorization at the expense of the development of a meaningful framework within which to consider biological phenomena. About a decade ago, we began a reconsideration of what an introductory course should present to students and the skills they need to master. The original Web-based course's design presaged many of the recommendations of the Vision and Change report; in particular, a focus on social evolutionary mechanisms, stochastic (evolutionary and molecular) processes, and core ideas (cellular continuity, evolutionary homology, molecular interactions, coupled chemical reactions, and molecular machines). Inspired by insights from the Chemistry, Life, the Universe & Everything general chemistry project, we transformed the original Web version into a (freely available) book with a more unified narrative flow and a set of formative assessments delivered through the beSocratic system. We outline how student responses to course materials are guiding future course modifications, in particular a more concerted effort at helping students to construct logical, empirically based arguments, explanations, and models. © 2016 M. W. Klymkowsky et al. CBE—Life Sciences Education © 2016 The American Society for Cell Biology. This article is distributed by The American Society for Cell Biology under license from the author(s). It is available to the public under an Attribution–Noncommercial–Share Alike 3.0 Unported Creative Commons License (http://creativecommons.org/licenses/by-nc-sa/3.0).

  11. Why Open Drug Discovery Needs Four Simple Rules for Licensing Data and Models

    PubMed Central

    Williams, Antony J.; Wilbanks, John; Ekins, Sean

    2012-01-01

    When we look at the rapid growth of scientific databases on the Internet in the past decade, we tend to take the accessibility and provenance of the data for granted. As we see a future of increased database integration, the licensing of the data may be a hurdle that hampers progress and usability. We have formulated four rules for licensing data for open drug discovery, which we propose as a starting point for consideration by databases and for their ultimate adoption. This work could also be extended to the computational models derived from such data. We suggest that scientists in the future will need to consider data licensing before they embark upon re-using such content in databases they construct themselves. PMID:23028298

  12. Application of the IBERDROLA RETRAN Licensing Methodology to the Confrentes BWR-6 110% Extended Power Uprate

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Fuente, Rafael de la; Iglesias, Javier; Sedano, Pablo G.

    IBERDROLA (Spanish utility) and IBERDROLA INGENIERIA (engineering branch) have been developing during the last 2 yr the 110% Extended Power Uprate Project for Cofrentes BWR-6. IBERDROLA has available an in-house design and licensing reload methodology that has been approved in advance by the Spanish Nuclear Regulatory Authority. This methodology has been applied to perform the nuclear design and the reload licensing analysis for Cofrentes cycles 12 and 13 and to develop a significant number of safety analyses of the Cofrentes Extended Power.Because the scope of the licensing process of the Cofrentes Extended Power Uprate exceeds the range of analysis includedmore » in the Cofrentes generic reload licensing process, it has been required to extend the applicability of the Cofrentes RETRAN model to the analysis of new transients. This is the case of the total loss of feedwater (TLFW) transient.The content of this paper shows the benefits of having an in-house design and licensing methodology and describes the process to extend the applicability of the Cofrentes RETRAN model to the analysis of new transients, particularly in this paper the TLFW transient.« less

  13. 75 FR 56494 - High-Cost Universal Service Support and Federal-State Joint Board on Universal Service

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-16

    ... Wireless Services. In 2008, the Commission conducted the auction of Advanced Wireless Services (``AWS'') licenses. This auction, which as designated as Auction 78, offered 35 licenses in the AWS 1710-1755 MHz and 2110-2155 MHz bands (``AWS-1''). The AWS-1 licenses were licenses for which there were no winning bids...

  14. 78 FR 60321 - Biweekly Notice; Applications and Amendments to Facility Operating Licenses and Combined Licenses...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-10-01

    ... sample selection. A steam generator tube rupture (SGTR) event is one of the design basis accidents that... in the design basis accident analysis. The proposed change will not cause the consequences of a SGTR... changes to the plant design basis or postulated accidents resulting from potential tube degradation. The...

  15. 36 CFR § 1234.12 - What are the fire safety requirements that apply to records storage facilities?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... records storage facilities? (a) The fire detection and protection systems must be designed or reviewed by a licensed fire protection engineer. If the system was not designed by a licensed fire protection... engineer that describes the design intent of the fire detection and suppression system, detailing the...

  16. 42 CFR 431.704 - Nursing homes designated by other terms.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 42 Public Health 4 2010-10-01 2010-10-01 false Nursing homes designated by other terms. 431.704... Programs for Licensing Nursing Home Administrators § 431.704 Nursing homes designated by other terms. If a State licensing law does not use the term “nursing home,” the CMS Administrator will determine the term...

  17. 42 CFR 431.704 - Nursing homes designated by other terms.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 42 Public Health 4 2011-10-01 2011-10-01 false Nursing homes designated by other terms. 431.704... Programs for Licensing Nursing Home Administrators § 431.704 Nursing homes designated by other terms. If a State licensing law does not use the term “nursing home,” the CMS Administrator will determine the term...

  18. 42 CFR 431.704 - Nursing homes designated by other terms.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 42 Public Health 4 2013-10-01 2013-10-01 false Nursing homes designated by other terms. 431.704... Programs for Licensing Nursing Home Administrators § 431.704 Nursing homes designated by other terms. If a State licensing law does not use the term “nursing home,” the CMS Administrator will determine the term...

  19. 42 CFR 431.704 - Nursing homes designated by other terms.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 42 Public Health 4 2012-10-01 2012-10-01 false Nursing homes designated by other terms. 431.704... Programs for Licensing Nursing Home Administrators § 431.704 Nursing homes designated by other terms. If a State licensing law does not use the term “nursing home,” the CMS Administrator will determine the term...

  20. 42 CFR 431.704 - Nursing homes designated by other terms.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 42 Public Health 4 2014-10-01 2014-10-01 false Nursing homes designated by other terms. 431.704... Programs for Licensing Nursing Home Administrators § 431.704 Nursing homes designated by other terms. If a State licensing law does not use the term “nursing home,” the CMS Administrator will determine the term...

  1. Compulsory licensing often did not produce lower prices for antiretrovirals compared to international procurement.

    PubMed

    Beall, Reed F; Kuhn, Randall; Attaran, Amir

    2015-03-01

    Compulsory licensing has been widely suggested as a legal mechanism for bypassing patents to introduce lower-cost generic antiretrovirals for HIV/AIDS in developing countries. Previous studies found that compulsory licensing can reduce procurement prices for drugs, but it is unknown how the resulting prices compare to procurements through the Global Fund to Fight AIDS, Tuberculosis, and Malaria; UNICEF; and other international channels. For this study we systematically constructed a case-study database of compulsory licensing activity for antiretrovirals and compared compulsory license prices to those in the World Health Organization's (WHO's) Global Price Reporting Mechanism and the Global Fund's Price and Quality Reporting Tool. Thirty compulsory license cases were analyzed with 673 comparable procurements from WHO and Global Fund data. Compulsory license prices exceeded the median international procurement prices in nineteen of the thirty case studies, often with a price gap of more than 25 percent. Compulsory licensing often delivered suboptimal value when compared to the alternative of international procurement, especially when used by low-income countries to manufacture medicines locally. There is an ongoing need for multilateral and charitable actors to work collectively with governments and medicine suppliers on policy options. Project HOPE—The People-to-People Health Foundation, Inc.

  2. On the Social Construction of Overdiagnosis Comment on "Medicalisation and Overdiagnosis: What Society Does to Medicine".

    PubMed

    Hofmann, Bjørn

    2017-02-25

    In an interesting article Wieteke van Dijk and colleagues argue that societal developments and values influence the practice of medicine, and thus can result in both medicalisation and overdiagnosis. They provide a convincing argument that overdiagnosis emerges in a social context and that it has socially constructed implications. However, they fail to show that overdiagnosis per se is socially constructed and how this construction occurs. Moreover, the authors discuss overdiagnosis on a micro level without acknowledging that overdiagnosis cannot be observed in individuals "in the doctor's office." We cannot tell whether a diagnosed person is overdiagnosed or not. This is the core of the problem. Despite these shortcomings, Wieteke van Dijk and her colleagues are certainly on to something important, and they should be encouraged to elaborate their perspective. We certainly need to deepen our understanding of the social construction of overdiagnosis. © 2017 The Author(s); Published by Kerman University of Medical Sciences. This is an open-access article distributed under the terms of the Creative Commons Attribution License (http://creativecommons.org/licenses/by/4.0), which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.

  3. 76 FR 16842 - Request for a License To Export Reactor Components

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-25

    ... NUCLEAR REGULATORY COMMISSION Request for a License To Export Reactor Components Pursuant to 10.... Mechanical Corporation. coolant pump 1000 (design) maintenance, and systems, related reactors. operation of AP- equipment, and 1000 (design) spare parts. nuclear reactors. February 10, 2011 February 23, 2011...

  4. What variables can influence clinical reasoning?

    PubMed Central

    Ashoorion, Vahid; Liaghatdar, Mohammad Javad; Adibi, Peyman

    2012-01-01

    Background: Clinical reasoning is one of the most important competencies that a physician should achieve. Many medical schools and licensing bodies try to predict it based on some general measures such as critical thinking, personality, and emotional intelligence. This study aimed at providing a model to design the relationship between the constructs. Materials and Methods: Sixty-nine medical students participated in this study. A battery test devised that consist four parts: Clinical reasoning measures, personality NEO inventory, Bar-On EQ inventory, and California critical thinking questionnaire. All participants completed the tests. Correlation and multiple regression analysis consumed for data analysis. Results: There is low to moderate correlations between clinical reasoning and other variables. Emotional intelligence is the only variable that contributes clinical reasoning construct (r=0.17-0.34) (R2 chnage = 0.46, P Value = 0.000). Conclusion: Although, clinical reasoning can be considered as a kind of thinking, no significant correlation detected between it and other constructs. Emotional intelligence (and its subscales) is the only variable that can be used for clinical reasoning prediction. PMID:23853636

  5. The invisibility of fisheries in the process of hydropower development across the Amazon.

    PubMed

    Doria, Carolina Rodrigues da Costa; Athayde, Simone; Marques, Elineide E; Lima, Maria Alice Leite; Dutka-Gianelli, Jynessa; Ruffino, Mauro Luis; Kaplan, David; Freitas, Carlos E C; Isaac, Victoria N

    2018-05-01

    We analyze the invisibility of fisheries and inadequacy of fishers' participation in the process of hydropower development in the Amazon, focusing on gaps between legally mandated and actual outcomes. Using Ostrom's institutional design principles for assessing common-pool resource management, we selected five case studies from Brazilian Amazonian watersheds to conduct an exploratory comparative case-study analysis. We identify similar problems across basins, including deficiencies in the dam licensing process; critical data gaps; inadequate stakeholder participation; violation of human rights; neglect of fishers' knowledge; lack of organization and representation by fishers' groups; and lack of governmental structure and capacity to manage dam construction activities or support fishers after dam construction. Fishers have generally been marginalized or excluded from decision-making regarding planning, construction, mitigation, compensation, and monitoring of the social-ecological impacts of hydroelectric dams. Addressing these deficiencies will require concerted investments and efforts by dam developers, government agencies and civil society, and the promotion of inter-sectorial dialogue and cross-scale participatory planning and decision-making that includes fishers and their associations.

  6. Computational design of RNAs with complex energy landscapes.

    PubMed

    Höner zu Siederdissen, Christian; Hammer, Stefan; Abfalter, Ingrid; Hofacker, Ivo L; Flamm, Christoph; Stadler, Peter F

    2013-12-01

    RNA has become an integral building material in synthetic biology. Dominated by their secondary structures, which can be computed efficiently, RNA molecules are amenable not only to in vitro and in vivo selection, but also to rational, computation-based design. While the inverse folding problem of constructing an RNA sequence with a prescribed ground-state structure has received considerable attention for nearly two decades, there have been few efforts to design RNAs that can switch between distinct prescribed conformations. We introduce a user-friendly tool for designing RNA sequences that fold into multiple target structures. The underlying algorithm makes use of a combination of graph coloring and heuristic local optimization to find sequences whose energy landscapes are dominated by the prescribed conformations. A flexible interface allows the specification of a wide range of design goals. We demonstrate that bi- and tri-stable "switches" can be designed easily with moderate computational effort for the vast majority of compatible combinations of desired target structures. RNAdesign is freely available under the GPL-v3 license. Copyright © 2013 Wiley Periodicals, Inc.

  7. 10 CFR 50.33 - Contents of applications; general information.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    .... (e) The class of license applied for, the use to which the facility will be put, the period of time... applicable, the following should be provided: (1) If the application is for a construction permit, the... assurance of obtaining the funds necessary to cover estimated construction costs and related fuel cycle...

  8. 77 FR 64565 - Solicitation of Feedback and Lessons-Learned from the Pilot of the Revised Construction Reactor...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-22

    ... NUCLEAR REGULATORY COMMISSION [NRC-2012-0249] Solicitation of Feedback and Lessons-Learned from... or the Commission) is soliciting feedback and lessons-learned from members of the public, licensees... constructed in accordance with the licensing basis. The NRC has applied lessons- learned from the prior plants...

  9. 47 CFR 73.1692 - Broadcast station construction near or installation on an AM broadcast tower.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... the indirect method (see § 73.51). Upon the completion of the installation, antenna impedance... completion of construction, antenna impedance measurements of the AM station shall be made. In addition... simultaneously with the filing of the application for license to cover this permit, the results of the impedance...

  10. 47 CFR 73.1692 - Broadcast station construction near or installation on an AM broadcast tower.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... the indirect method (see § 73.51). Upon the completion of the installation, antenna impedance... completion of construction, antenna impedance measurements of the AM station shall be made. In addition... simultaneously with the filing of the application for license to cover this permit, the results of the impedance...

  11. Foot Comfort for the Fashionable

    NASA Technical Reports Server (NTRS)

    2002-01-01

    Modellista Footwear's new shoe line uses Tempur(TM) material, which conforms to each wearer's unique foot shape to absorb shock and cushion the foot. The foam's properties allow the shoe to change with the wearer's foot as it shrinks and swells throughout the day. Scientists at NASA's Ames Research Center originally developed temper foam in the early 1970s to relieve the intense pressure of G-forces experienced by astronauts during rocket launches. Tempur-Pedic, Inc., further developed the foam and granted Modellista a license to use it in footwear. The Modellista collection is the first shoe design and construction to be certified by the Space Awareness Alliance. The shoes, with designs ranging from traditional clog shapes to sling backs and open-toe sandals, are currently available nationwide at select specialty shoe stores and through catalogs. Tempur(TM) is a registered trademark of Tempur-Pedic, Inc.

  12. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Goodson, J.O.

    This is the first of three volumes which document the historical development of the first US compressed-air energy storage (CAES) Power-generation facility. Volume 1 is a background report and presents a chronicle of the development of the CAES facility from the early interest in CAES until inception of engineering/construction on August 11, 1988. The 110 MW - 26 hr CAES plant is owned and operated by Alabama Electric Cooperative, Inc. (AEC) of Andalusia, Alabama. The plant is the first CAES plant in the United States and the world's first CAES facility incorporating a recuperator to improve efficiency. The plant suppliesmore » competitively priced peaking power to the AEC owner members. The economics of CAES-produced power is attractive because the energy-intensive air-compression mode is powered by relatively inexpensive base-load power external to the CAES plant. The compressed-air energy is stored underground until needed, and during the power-production mode, the only fuel required is that to heat the compressed air to expander-inlet temperature. The project development for AEC's CAES plant involved much planning and preliminary design work. Specifically, this included load and generation-planning studies, power-supply selections, conceptual designs, project administration, air-storage cavern and turbomachinery specifications and design, contract requirements, environmental and licensing issues, and construction planning.« less

  13. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Goodson, J.O.

    This is the first of three volumes which document the historical development of the first US compressed-air energy storage (CAES) Power-generation facility. Volume 1 is a background report and presents a chronicle of the development of the CAES facility from the early interest in CAES until inception of engineering/construction on August 11, 1988. The 110 MW - 26 hr CAES plant is owned and operated by Alabama Electric Cooperative, Inc. (AEC) of Andalusia, Alabama. The plant is the first CAES plant in the United States and the world`s first CAES facility incorporating a recuperator to improve efficiency. The plant suppliesmore » competitively priced peaking power to the AEC owner members. The economics of CAES-produced power is attractive because the energy-intensive air-compression mode is powered by relatively inexpensive base-load power external to the CAES plant. The compressed-air energy is stored underground until needed, and during the power-production mode, the only fuel required is that to heat the compressed air to expander-inlet temperature. The project development for AEC`s CAES plant involved much planning and preliminary design work. Specifically, this included load and generation-planning studies, power-supply selections, conceptual designs, project administration, air-storage cavern and turbomachinery specifications and design, contract requirements, environmental and licensing issues, and construction planning.« less

  14. 10 CFR 2.1010 - Pre-License Application Presiding Officer.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 1 2010-01-01 2010-01-01 false Pre-License Application Presiding Officer. 2.1010 Section 2.1010 Energy NUCLEAR REGULATORY COMMISSION RULES OF PRACTICE FOR DOMESTIC LICENSING PROCEEDINGS AND..., that the adverse determination constitutes an abuse of discretion. The designated officer's decision...

  15. 10 CFR 52.171 - Finality of manufacturing licenses; information requests.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 10 Energy 2 2013-01-01 2013-01-01 false Finality of manufacturing licenses; information requests. 52.171 Section 52.171 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSES, CERTIFICATIONS, AND... manufactured reactor, the costs and benefits of severe accident mitigation design alternatives, and the bases...

  16. 10 CFR 52.171 - Finality of manufacturing licenses; information requests.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 2 2011-01-01 2011-01-01 false Finality of manufacturing licenses; information requests. 52.171 Section 52.171 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSES, CERTIFICATIONS, AND... manufactured reactor, the costs and benefits of severe accident mitigation design alternatives, and the bases...

  17. 10 CFR 52.171 - Finality of manufacturing licenses; information requests.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 10 Energy 2 2014-01-01 2014-01-01 false Finality of manufacturing licenses; information requests. 52.171 Section 52.171 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSES, CERTIFICATIONS, AND... manufactured reactor, the costs and benefits of severe accident mitigation design alternatives, and the bases...

  18. 10 CFR 52.171 - Finality of manufacturing licenses; information requests.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 10 Energy 2 2012-01-01 2012-01-01 false Finality of manufacturing licenses; information requests. 52.171 Section 52.171 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSES, CERTIFICATIONS, AND... manufactured reactor, the costs and benefits of severe accident mitigation design alternatives, and the bases...

  19. 47 CFR 25.144 - Licensing provisions for the 2.3 GHz satellite digital audio radio service.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... (CONTINUED) COMMON CARRIER SERVICES SATELLITE COMMUNICATIONS Applications and Licenses Space Stations § 25... of such communications, and the frequencies and emission designators used by the repeaters to re..., the frequencies and emission designators of such communications, and the frequencies and emission...

  20. Family Day Care Training Curriculum (Lao).

    ERIC Educational Resources Information Center

    Nakatsu, Gail

    California's Family Day Care Training Program was designed to recruit and train, in 7 weeks, Lao, Vietnamese, and Chinese refugees to establish their own state-licensed, family day care homes. Topics in the program's curriculum include an introduction to family day care, state licenses for family day care, state licensing requirements for family…

  1. Family Day Care Training Curriculum.

    ERIC Educational Resources Information Center

    Nakatsu, Gail

    California's Family Day Care Training Program was designed to recruit and train in 7 weeks, Lao, Vietnamese, and Chinese refugees to establish their own state-licensed, family day care homes. Topics in the program's curriculum include an introduction to family day care, state licenses for family day care, state licensing requirements for family…

  2. 37 CFR 370.5 - Designated collection and distribution organizations for reports of use of sound recordings under...

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Patents, Trademarks, and Copyrights COPYRIGHT ROYALTY BOARD, LIBRARY OF CONGRESS NOTICE AND RECORDKEEPING... for collection and distribution of performance royalties under statutory license for digital... recordings under statutory license. The address of the Licensing Division is: Library of Congress, Copyright...

  3. 37 CFR 370.5 - Designated collection and distribution organizations for reports of use of sound recordings under...

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... Patents, Trademarks, and Copyrights COPYRIGHT ROYALTY BOARD, LIBRARY OF CONGRESS NOTICE AND RECORDKEEPING... for collection and distribution of performance royalties under statutory license for digital... recordings under statutory license. The address of the Licensing Division is: Library of Congress, Copyright...

  4. 37 CFR 370.5 - Designated collection and distribution organizations for reports of use of sound recordings under...

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... Patents, Trademarks, and Copyrights COPYRIGHT ROYALTY BOARD, LIBRARY OF CONGRESS NOTICE AND RECORDKEEPING... for collection and distribution of performance royalties under statutory license for digital... recordings under statutory license. The address of the Licensing Division is: Library of Congress, Copyright...

  5. 37 CFR 370.5 - Designated collection and distribution organizations for reports of use of sound recordings under...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Patents, Trademarks, and Copyrights COPYRIGHT ROYALTY BOARD, LIBRARY OF CONGRESS NOTICE AND RECORDKEEPING... for collection and distribution of performance royalties under statutory license for digital... recordings under statutory license. The address of the Licensing Division is: Library of Congress, Copyright...

  6. 37 CFR 370.5 - Designated collection and distribution organizations for reports of use of sound recordings under...

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Patents, Trademarks, and Copyrights COPYRIGHT ROYALTY BOARD, LIBRARY OF CONGRESS NOTICE AND RECORDKEEPING... for collection and distribution of performance royalties under statutory license for digital... recordings under statutory license. The address of the Licensing Division is: Library of Congress, Copyright...

  7. Application Of The Iberdrola Licensing Methodology To The Cofrentes BWR-6 110% Extended Power Up-rate

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Mata, Pedro; Fuente, Rafael de la; Iglesias, Javier

    Iberdrola (spanish utility) and Iberdrola Ingenieria (engineering branch) have been developing during the last two years the 110% Extended Power Up-rate Project (EPU 110%) for Cofrentes BWR-6. IBERDROLA has available an in-house design and licensing reload methodology that has been approved by the Spanish Nuclear Regulatory Authority. This methodology has been already used to perform the nuclear design and the reload licensing analysis for Cofrentes cycles 12 to 14. The methodology has been also applied to develop a significant number of safety analysis of the Cofrentes Extended Power Up-rate including: Reactor Heat Balance, Core and Fuel performance, Thermal Hydraulic Stability,more » ECCS LOCA Evaluation, Transient Analysis, Anticipated Transient Without Scram (ATWS) and Station Blackout (SBO) Since the scope of the licensing process of the Cofrentes Extended Power Up-rate exceeds the range of analysis included in the Cofrentes generic reload licensing process, it has been required to extend the applicability of the Cofrentes licensing methodology to the analysis of new transients. This is the case of the TLFW transient. The content of this paper shows the benefits of having an in-house design and licensing methodology, and describes the process to extend the applicability of the methodology to the analysis of new transients. The case of analysis of Total Loss of Feedwater with the Cofrentes Retran Model is included as an example of this process. (authors)« less

  8. 76 FR 29240 - Environmental Impacts Statements; Notice of Availability

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-20

    ...-283-7681. EIS No. 20110150, Final EIS, DOE, ID, ADOPTION--Areva Eagle Rock Enrichment Facility... Uranium Enrichment Facility, Construction, Operation, and Decommission, License Issuance, Piketon, OH...

  9. Special Inspector General for Iraq Reconstruction Quarterly Report to the United States Congress

    DTIC Science & Technology

    2012-04-30

    Ministry of Provincial Aff airs sponsored a two-day decentralization conference for all non-KRG Provincial Councils and gover - nors to clarify...agriculture, tourism , health, education, housing and light construction, water resources, electricity, oil and gas, and transporta- tion. Th e assessment...2008−2011 Sector Number of Licenses Value of Licenses $ Millions Housing 155 16,250 Industry 136 6,392 Tourism 192 4,416 Trade 146 1,596 Agriculture 62

  10. 77 FR 53198 - Environmental Impacts Statements; Notice of Availability

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-31

    ..., Fluoride Extraction Process and Depleted Uranium Deconversion Plant, License Application to Construct... River National Forest Oil and Gas Leasing, Eagle, Garfield, Gunnison, Mesa, Moffat, Pitkin, Rio Blanco...

  11. Nuclear Regulatory Commission Issuances. Opinions and decisions of the Nuclear Regulatory Commission with selected orders: July 1, 1992--December 31, 1992, Volume 36, Pages 1--396

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1992-12-31

    This is the thirty-sixth volume of issuances (1-396) of the Nuclear Regulatory Commission and its Atomic Safety and Licensing Boards, Administrative Law Judges, and Office Directors. It covers the period from July 1, 1992-December 31, 1992. Atomic Safety and Licensing Boards are authorized by Section 191 of the Atomic Energy Act of 1954. These Boards, comprised of three members conduct adjudicatory hearings on applications to construct and operate nuclear power plants and related facilities and issue initial decisions which, subject to internal review and appellate procedures, become the final Commission action with respect to those applications. Boards are drawn frommore » the Atomic Safety and Licensing Board Panel, comprised of lawyers, nuclear physicists and engineers, environmentalists, chemists, and economists. The Atomic Energy Commission first established Licensing Boards in 1962 and the Panel in 1967.« less

  12. 10 CFR 2.100 - Scope of subpart.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 1 2011-01-01 2011-01-01 false Scope of subpart. 2.100 Section 2.100 Energy NUCLEAR... for Issuance, Amendment, Transfer, or Renewal of a License, and Standard Design Approval § 2.100 Scope... at the request of the licensee; transfer and renewal of a license; and issuance of a standard design...

  13. 10 CFR 2.100 - Scope of subpart.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 1 2010-01-01 2010-01-01 false Scope of subpart. 2.100 Section 2.100 Energy NUCLEAR... for Issuance, Amendment, Transfer, or Renewal of a License, and Standard Design Approval § 2.100 Scope... at the request of the licensee; transfer and renewal of a license; and issuance of a standard design...

  14. 10 CFR 50.43 - Additional standards and provisions affecting class 103 licenses and certifications for...

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 10 Energy 1 2012-01-01 2012-01-01 false Additional standards and provisions affecting class 103... Regulatory Approvals § 50.43 Additional standards and provisions affecting class 103 licenses and... propose nuclear reactor designs which differ significantly from light-water reactor designs that were...

  15. 10 CFR 50.43 - Additional standards and provisions affecting class 103 licenses and certifications for...

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 10 Energy 1 2014-01-01 2014-01-01 false Additional standards and provisions affecting class 103... Regulatory Approvals § 50.43 Additional standards and provisions affecting class 103 licenses and... propose nuclear reactor designs which differ significantly from light-water reactor designs that were...

  16. 10 CFR 50.43 - Additional standards and provisions affecting class 103 licenses and certifications for...

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 10 Energy 1 2013-01-01 2013-01-01 false Additional standards and provisions affecting class 103... Regulatory Approvals § 50.43 Additional standards and provisions affecting class 103 licenses and... propose nuclear reactor designs which differ significantly from light-water reactor designs that were...

  17. 10 CFR 50.43 - Additional standards and provisions affecting class 103 licenses and certifications for...

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 1 2011-01-01 2011-01-01 false Additional standards and provisions affecting class 103... Regulatory Approvals § 50.43 Additional standards and provisions affecting class 103 licenses and... propose nuclear reactor designs which differ significantly from light-water reactor designs that were...

  18. Final Environmental Impact Statement for the construction and operation of Claiborne Enrichment Center, Homer, Louisiana (Docket No. 70-3070)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Zeitoun, A.

    1994-08-01

    This two-volume Final Environmental Impact Statement (FEIS) was prepared by the Nuclear Regulatory Commission (NRC) in accordance with regulation 10 CFR Part 51, which implements the National Environmental Policy Act (NEPA). Volume 1 contains the assessment of the potential environmental impacts for licensing the construction and operation of a proposed gaseous centrifuge enrichment facility to be built in Claiborne Parish, Louisiana, by Louisiana Energy Services, LP. (LES). The proposed facility would have a production capacity of about 866 metric tons annually of up to 5 weight percent enriched UF{sub 6}, using a proven centrifuge technology. Included in the assessment aremore » construction, both normal operations and potential accidents (internal and external events), and the eventual decontamination and decommissioning (D&D)- of the site. Issues addressed include the purpose and need for the facility, the alternatives to the proposed action, potential disposition of the tails, the site selection process, and environmental justice. The NRC staff concludes that the facility can be constructed and operated with small and acceptable impacts on the public and the environment. The FEIS supports issuance of a license to the applicant, Louisiana Energy Services, to authorize construction and operation of the proposed facility.« less

  19. Experimental testing of a new integrated model of the budding yeast Start transition.

    PubMed

    Adames, Neil R; Schuck, P Logan; Chen, Katherine C; Murali, T M; Tyson, John J; Peccoud, Jean

    2015-11-05

    The cell cycle is composed of bistable molecular switches that govern the transitions between gap phases (G1 and G2) and the phases in which DNA is replicated (S) and partitioned between daughter cells (M). Many molecular details of the budding yeast G1-S transition (Start) have been elucidated in recent years, especially with regard to its switch-like behavior due to positive feedback mechanisms. These results led us to reevaluate and expand a previous mathematical model of the yeast cell cycle. The new model incorporates Whi3 inhibition of Cln3 activity, Whi5 inhibition of SBF and MBF transcription factors, and feedback inhibition of Whi5 by G1-S cyclins. We tested the accuracy of the model by simulating various mutants not described in the literature. We then constructed these novel mutant strains and compared their observed phenotypes to the model's simulations. The experimental results reported here led to further changes of the model, which will be fully described in a later article. Our study demonstrates the advantages of combining model design, simulation, and testing in a coordinated effort to better understand a complex biological network. © 2015 Adames et al. This article is distributed by The American Society for Cell Biology under license from the author(s). Two months after publication it is available to the public under an Attribution–Noncommercial–Share Alike 3.0 Unported Creative Commons License (http://creativecommons.org/licenses/by-nc-sa/3.0).

  20. 9 CFR 108.8 - Construction of buildings.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... cross-contamination of such biological products. Halls or walkways shall be provided for the movement of... products. (d) All rooms and compartments at licensed establishments shall have an adequate air handling...

  1. PLAID- A COMPUTER AIDED DESIGN SYSTEM

    NASA Technical Reports Server (NTRS)

    Brown, J. W.

    1994-01-01

    PLAID is a three-dimensional Computer Aided Design (CAD) system which enables the user to interactively construct, manipulate, and display sets of highly complex geometric models. PLAID was initially developed by NASA to assist in the design of Space Shuttle crewstation panels, and the detection of payload object collisions. It has evolved into a more general program for convenient use in many engineering applications. Special effort was made to incorporate CAD techniques and features which minimize the users workload in designing and managing PLAID models. PLAID consists of three major modules: the Primitive Object Generator (BUILD), the Composite Object Generator (COG), and the DISPLAY Processor. The BUILD module provides a means of constructing simple geometric objects called primitives. The primitives are created from polygons which are defined either explicitly by vertex coordinates, or graphically by use of terminal crosshairs or a digitizer. Solid objects are constructed by combining, rotating, or translating the polygons. Corner rounding, hole punching, milling, and contouring are special features available in BUILD. The COG module hierarchically organizes and manipulates primitives and other previously defined COG objects to form complex assemblies. The composite object is constructed by applying transformations to simpler objects. The transformations which can be applied are scalings, rotations, and translations. These transformations may be defined explicitly or defined graphically using the interactive COG commands. The DISPLAY module enables the user to view COG assemblies from arbitrary viewpoints (inside or outside the object) both in wireframe and hidden line renderings. The PLAID projection of a three-dimensional object can be either orthographic or with perspective. A conflict analysis option enables detection of spatial conflicts or collisions. DISPLAY provides camera functions to simulate a view of the model through different lenses. Other features include hardcopy plot generation, scaling and zoom options, distance tabulations, and descriptive text in different sizes and fonts. An object in the PLAID database is not just a collection of lines; rather, it is a true three-dimensional representation from which correct hidden line renditions can be computed for any specified eye point. The drawings produced in the various modules of PLAID can be stored in files for future use. The PLAID program product is available by license for a period of 10 years to domestic U.S. licensees. The licensed program product includes the PLAID source code, command procedures, sample applications, and one set of supporting documentation. Copies of the documentation may be purchased separately at the price indicated below. PLAID is written in FORTRAN 77 for single user interactive execution and has been implemented on a DEC VAX series computer operating under VMS with a recommended core memory of four megabytes. PLAID requires a Tektronix 4014 compatible graphics display terminal and optionally uses a Tektronix 4631 compatible graphics hardcopier. Plots of resulting PLAID displays may be produced using the Calcomp 960, HP 7221, or HP 7580 plotters. Digitizer tablets can also be supported. This program was developed in 1986.

  2. Leaf LIMS: A Flexible Laboratory Information Management System with a Synthetic Biology Focus.

    PubMed

    Craig, Thomas; Holland, Richard; D'Amore, Rosalinda; Johnson, James R; McCue, Hannah V; West, Anthony; Zulkower, Valentin; Tekotte, Hille; Cai, Yizhi; Swan, Daniel; Davey, Robert P; Hertz-Fowler, Christiane; Hall, Anthony; Caddick, Mark

    2017-12-15

    This paper presents Leaf LIMS, a flexible laboratory information management system (LIMS) designed to address the complexity of synthetic biology workflows. At the project's inception there was a lack of a LIMS designed specifically to address synthetic biology processes, with most systems focused on either next generation sequencing or biobanks and clinical sample handling. Leaf LIMS implements integrated project, item, and laboratory stock tracking, offering complete sample and construct genealogy, materials and lot tracking, and modular assay data capture. Hence, it enables highly configurable task-based workflows and supports data capture from project inception to completion. As such, in addition to it supporting synthetic biology it is ideal for many laboratory environments with multiple projects and users. The system is deployed as a web application through Docker and is provided under a permissive MIT license. It is freely available for download at https://leaflims.github.io .

  3. 78 FR 5797 - Missisquoi Associates; Notice of Application for Amendment of License and Soliciting Comments...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-28

    ... to allow its affiliate, EGP Solar 1, LLC, to construct and maintain a 2.2 megawatt solar photovoltaic... solar array would be constructed on both sides of Heather Lane (the project's access road), but public... be used for the solar array is currently devoid of trees, although some grading and tree cutting is...

  4. The trends and constructive ambiguity in international agreements on intellectual property and pharmaceutical affairs: Implications for domestic legislations in low- and middle-income countries.

    PubMed

    Son, Kyung-Bok; Lee, Tae-Jin

    2017-06-06

    The purpose of this study is to analyse the trends in international agreements including Agreement on Trade-Related Aspects of Intellectual Property Rights (TRIPS), Korea-United States Free Trade Agreements, and Trans-Pacific Partnership Agreements on intellectual property and pharmaceutical affairs with the updated framework. The study also assesses constructive ambiguity in international agreements, which might affect the implementation process through interpretation and domestic legislations. Five flexibility clauses and three TRIPS-plus provisions were selected, and presence of constructive ambiguity in the agreements was analysed to draw actual trends in international agreements. Flexibility provisions excluding compulsory licensing were not noticeably changed, and TRIPS-plus provisions including data exclusivity and patent linkage were expanded in scope or newly appeared, respectively. The clause regarding compulsory licensing, extension of the patent term, data exclusivity, and patent linkage showed unclear definitions or the lack of adequate explanations. With constructive ambiguity in those clauses, a country who wants to join international agreements in the near future could amend domestic legislations to minimise the detrimental effect of international agreements on access to medicines.

  5. 77 FR 14360 - Environmental Impacts Statements; Notice of Availability

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-09

    ... Global Laser Enrichment LLC Facility, Issuance of License to Construct, Operate, and Decommission a Laser-Based Uranium Enrichment Facility, Wilmington, NC, Review Period Ends: 04/09/2012, Contact: Jennifer A...

  6. 9 CFR 11.7 - Certification and licensing of designated qualified persons (DQP's).

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... instruction on the anatomy and physiology of the limbs of a horse. The instructor teaching the course must be... 9 Animals and Animal Products 1 2012-01-01 2012-01-01 false Certification and licensing of designated qualified persons (DQP's). 11.7 Section 11.7 Animals and Animal Products ANIMAL AND PLANT HEALTH...

  7. 9 CFR 11.7 - Certification and licensing of designated qualified persons (DQP's).

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... instruction on the anatomy and physiology of the limbs of a horse. The instructor teaching the course must be... 9 Animals and Animal Products 1 2014-01-01 2014-01-01 false Certification and licensing of designated qualified persons (DQP's). 11.7 Section 11.7 Animals and Animal Products ANIMAL AND PLANT HEALTH...

  8. 9 CFR 11.7 - Certification and licensing of designated qualified persons (DQP's).

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... instruction on the anatomy and physiology of the limbs of a horse. The instructor teaching the course must be... 9 Animals and Animal Products 1 2013-01-01 2013-01-01 false Certification and licensing of designated qualified persons (DQP's). 11.7 Section 11.7 Animals and Animal Products ANIMAL AND PLANT HEALTH...

  9. 9 CFR 11.7 - Certification and licensing of designated qualified persons (DQP's).

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... instruction on the anatomy and physiology of the limbs of a horse. The instructor teaching the course must be... 9 Animals and Animal Products 1 2010-01-01 2010-01-01 false Certification and licensing of designated qualified persons (DQP's). 11.7 Section 11.7 Animals and Animal Products ANIMAL AND PLANT HEALTH...

  10. 9 CFR 11.7 - Certification and licensing of designated qualified persons (DQP's).

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... instruction on the anatomy and physiology of the limbs of a horse. The instructor teaching the course must be... 9 Animals and Animal Products 1 2011-01-01 2011-01-01 false Certification and licensing of designated qualified persons (DQP's). 11.7 Section 11.7 Animals and Animal Products ANIMAL AND PLANT HEALTH...

  11. Getting Your Driver's License. An Adult Competency Education Learning Module.

    ERIC Educational Resources Information Center

    Wallace, Virginia

    This instructional unit on getting one's driver's license is one of six Adult Competency Education Learning Modules designed for use in a program of competency-based instruction for students with intermediate reading level ability. It is self-contained and designed for immediate classroom use. The module is comprised of 4 parts and 10 lessons: The…

  12. 77 FR 25753 - Biweekly Notice; Applications and Amendments to Facility Operating Licenses and Combined Licenses...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-01

    ... provide post accident design basis cooling. Therefore, the proposed change does not involve a significant... operating margin inherent in the design orifices of the RHR suppression pool cooling test return line and... information in comment submissions that you do not want to be publicly disclosed. The NRC posts all comment...

  13. 15 CFR 922.47 - Pre-existing authorizations or rights and certifications of pre-existing authorizations or rights.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... rights of subsistence use or access in existence on the date of designation of any National Marine... leases, permits, licenses, or rights consistent with the purposes for which the Sanctuary was designated... authorized by a valid lease, permit, license, approval or other authorization in existence on the effective...

  14. 15 CFR 922.47 - Pre-existing authorizations or rights and certifications of pre-existing authorizations or rights.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... rights of subsistence use or access in existence on the date of designation of any National Marine... leases, permits, licenses, or rights consistent with the purposes for which the Sanctuary was designated... authorized by a valid lease, permit, license, approval or other authorization in existence on the effective...

  15. License-Exempt Child Care Providers: A Needs Assessment for Designing an Implementation Model

    ERIC Educational Resources Information Center

    Roseburr, Linda Joyce

    2008-01-01

    Many children from low-income families appear to be not receiving quality child care from their license-exempt subsidized child-care providers. The purpose of this qualitative case study was to obtain data from a sample of license-exempt providers/caregivers and parents from a mailed self-administered survey and telephone interview. Four research…

  16. 7 CFR Appendix C to Subpart B of... - Technical Report for Hydropower Projects

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ...,000 require the services of a licensed professional engineer (PE) or team of PEs. Depending on the... services of a licensed PE or a team of licensed PEs may be required for smaller projects. (a) Qualifications of project team. The hydropower project team should consist of a system designer, a project...

  17. 7 CFR Appendix C to Subpart B of... - Technical Report for Hydropower Projects

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ...,000 require the services of a licensed professional engineer (PE) or team of PEs. Depending on the... services of a licensed PE or a team of licensed PEs may be required for smaller projects. (a) Qualifications of project team. The hydropower project team should consist of a system designer, a project...

  18. 7 CFR Appendix C to Subpart B of... - Technical Report for Hydropower Projects

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ...,000 require the services of a licensed professional engineer (PE) or team of PEs. Depending on the... services of a licensed PE or a team of licensed PEs may be required for smaller projects. (a) Qualifications of project team. The hydropower project team should consist of a system designer, a project...

  19. 18 CFR 4.4 - Service of report.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... PROJECT COSTS Determination of Cost of Projects Constructed Under License § 4.4 Service of report. Copies... the State where such project is located, and to such other parties as the Commission shall prescribe...

  20. Nuclear Power 2010 Program Dominion Virginia Power Cooperative Project U.S. Department of Energy Cooperative Agreement DE-FC07-05ID14635 Construction and Operating License Demonstration Project Final Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Eugene S. Grecheck

    2010-11-30

    This report serves to summarize the major activities completed as part of Virginia Electric and Power Company's North Anna construction and operating license demonstration project with DOE. Project successes, lessons learned, and suggestions for improvement are discussed. Objectives of the North Anna COL project included preparation and submittal of a COLA to the USNRC incorporating ESBWR technology for a third unit a the North Anna Power Station site, support for the NRC review process and mandatory hearing, obtaining NRC approval of the COLA and issuance of a COL, and development of a business case necessary to support a decision onmore » building a new nuclear power plant at the North Anna site.« less

  1. A new posterior iliac puncture/aspiration needle.

    PubMed

    Islam, Anwarul

    2016-03-25

    The needles that are currently used for obtaining bone marrow aspirate samples from the posterior ilium are typically those of 1930s vintage (eg, Klima, Salah or similar needles), which were specifically designed for sternal aspiration. These needles are not designed to obtain bone marrow aspirate samples from the posterior ilium and as a result they are unsatisfactory particularly if the patient is large or obese. A new posterior iliac puncture/aspiration needle has therefore been designed, which is particularly suited for bone marrow aspiration from the posterior ilium. The needle was tested on five cadavers and on five patients. The design and construction of the needle was found to be satisfactory and a marked improvement over the conventional sternal puncture needles particularly when large or obese patients were concerned. The new posterior iliac bone marrow aspiration needle has advantages that overcome the limitations of using a conventional sternal puncture needle to obtain marrow aspirates from the posterior ilium. Published by the BMJ Publishing Group Limited. For permission to use (where not already granted under a licence) please go to http://www.bmj.com/company/products-services/rights-and-licensing/

  2. ASME Nuclear Crane Standards for Enhanced Crane Safety and Increased Profit

    NASA Astrophysics Data System (ADS)

    Parkhurst, Stephen N.

    2000-01-01

    The ASME NOG-1 standard, 'Rules for Construction of Overhead and Gantry Cranes', covers top running cranes for nuclear facilities; with the ASME NUM-1 standard, 'Rules for Construction of Cranes, Monorails, and Hoists', covering the single girder, underhung, wall and jib cranes, as well as the monorails and hoists. These two ASME nuclear crane standards provide criteria for designing, inspecting and testing overhead handling equipment with enhanced safety to meet the 'defense-in-depth' approach of the United States Nuclear Regulatory Commission (USNRC) documents NUREG 0554 and NUREG 0612. In addition to providing designs for enhanced safety, the ASME nuclear crane standards provide a basis for purchasing overhead handling equipment with standard safety features, based upon accepted engineering principles, and including performance and environmental parameters specific to nuclear facilities. The ASME NOG-1 and ASME NUM-1 standards not only provide enhanced safety for handling a critical load, but also increase profit by minimizing the possibility of load drops, by reducing cumbersome operating restrictions, and by providing the foundation for a sound licensing position. The ASME nuclear crane standards can also increase profit by providing the designs and information to help ensure that the right standard equipment is purchased. Additionally, the ASME nuclear crane standards can increase profit by providing designs and information to help address current issues, such as the qualification of nuclear plant cranes for making 'planned engineered lifts' for steam generator replacement and decommissioning.

  3. Mixed Oxide Fresh Fuel Package Auxiliary Equipment

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Yapuncich, F.; Ross, A.; Clark, R.H.

    2008-07-01

    The United States Department of Energy's National Nuclear Security Administration (NNSA) is overseeing the construction the Mixed Oxide (MOX) Fuel Fabrication Facility (MFFF) on the Savannah River Site. The new facility, being constructed by NNSA's contractor Shaw AREVA MOX Services, will fabricate fuel assemblies utilizing surplus plutonium as feedstock. The fuel will be used in designated commercial nuclear reactors. The MOX Fresh Fuel Package (MFFP), which has recently been licensed by the Nuclear Regulatory Commission (NRC) as a type B package (USA/9295/B(U)F-96), will be utilized to transport the fabricated fuel assemblies from the MFFF to the nuclear reactors. It wasmore » necessary to develop auxiliary equipment that would be able to efficiently handle the high precision fuel assemblies. Also, the physical constraints of the MFFF and the nuclear power plants require that the equipment be capable of loading and unloading the fuel assemblies both vertically and horizontally. The ability to reconfigure the load/unload evolution builds in a large degree of flexibility for the MFFP for the handling of many types of both fuel and non fuel payloads. The design and analysis met various technical specifications including dynamic and static seismic criteria. The fabrication was completed by three major fabrication facilities within the United States. The testing was conducted by Sandia National Laboratories. The unique design specifications and successful testing sequences will be discussed. (authors)« less

  4. Current Status of the Nuclear Waste Management Programme in Finland - 13441

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lehto, Kimmo; Vuorio, Petteri

    2013-07-01

    Pursuant to the Decision-in-Principle of 2001 the Finnish programme for geologic disposal of spent fuel has now moved to the phase of applying for construction licence to build up the encapsulation plant and underground repository. The main objective of former programme phase, underground characterisation phase, was to confirm - or refute - the suitability of the Olkiluoto site by investigations conducted underground at the actual depth of the repository. The construction work of the access tunnel to the rock characterisation facility (ONKALO) started in the late summer of 2004. The site research and investigations work aimed at the maturity neededmore » for submission of the application for construction license of the actual repository in end of 2012. This requires, however, that also the technology has reached the maturity needed. The design and technical plans form the necessary platform for the development of the safety case for spent fuel disposal. A plan, 'road map', has been produced for the portfolio of reports that demonstrates the safety of disposal as required by the criteria set by the government and further detailed by the safety authority, STUK. (authors)« less

  5. Khoa Trinh Huan Luyen Giu Tre Ban Ngay Tai Gia (Family Day Care Training Curriculum--Vietnamese).

    ERIC Educational Resources Information Center

    Nakatsu, Gail

    California's Family Day Care Training Program was designed to recruit and train, in 7 weeks, Lao, Vietnamese, and Chinese refugees to establish their own state-licensed, family day care homes. Topics in the program's curriculum include an introduction to family day care, state licenses and licensing requirements for family day care, licensing…

  6. 15 CFR 744.8 - Restrictions on exports and reexports to persons designated pursuant to Executive Order 13382...

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... constitutes authorization for purposes of the EAR as well. (ii) U.S. persons must seek authorization from BIS... for items subject to the EAR on those same parties to further the objectives of Executive Order 13382. (a) License requirement(s) and authorization—(1) EAR license requirement. A license is required for...

  7. 15 CFR 744.8 - Restrictions on exports and reexports to persons designated pursuant to Executive Order 13382...

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... constitutes authorization for purposes of the EAR as well. (ii) U.S. persons must seek authorization from BIS... for items subject to the EAR on those same parties to further the objectives of Executive Order 13382. (a) License requirement(s) and authorization—(1) EAR license requirement. A license is required for...

  8. 15 CFR 744.8 - Restrictions on exports and reexports to persons designated pursuant to Executive Order 13382...

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... constitutes authorization for purposes of the EAR as well. (ii) U.S. persons must seek authorization from BIS... for items subject to the EAR on those same parties to further the objectives of Executive Order 13382. (a) License requirement(s) and authorization—(1) EAR license requirement. A license is required for...

  9. Licensed Professional Counselor Interns' Level of Self-Efficacy Relating to Graduate Program of Study and Institution Type

    ERIC Educational Resources Information Center

    Webster, Matthew A.

    2012-01-01

    In the state of Texas, Licensed Professional Counselors (LPCs) work to provide mental- health services designed to meet the needs of those who are dealing with a variety of affective, cognitive, and behavioral issues. Multiple educational pathways are available for obtaining the LPC license, with primary distinctions being among the graduate…

  10. Development and Field Test of Competency Based Instructional Material for a Career Mobility Program for Licensed Practical Nurses. Final Report.

    ERIC Educational Resources Information Center

    Bergen Community Coll., Paramus, NJ.

    The Associate Degree Nursing Program at Bergen Community College developed and field tested competency-based instructional modules in a program designed to allow licensed practical nurses to qualify to take the certification examination for registered nurses after a year of study. Thirteen licensed practical nurses were enrolled in the first class…

  11. 32 CFR 260.6 - Procedures.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... practical matter, the State licensing agency should be contacted early in the planning or design stage of a... completion of the final space layout of the building. (ii) Advise that the State licensing agency must...

  12. 32 CFR 260.6 - Procedures.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... practical matter, the State licensing agency should be contacted early in the planning or design stage of a... completion of the final space layout of the building. (ii) Advise that the State licensing agency must...

  13. Tools Lighten Designs, Maintain Structural Integrity

    NASA Technical Reports Server (NTRS)

    2009-01-01

    Collier Research Corporation of Hampton, Virginia, licensed software developed at Langley Research Center to reduce design weight through the use of composite materials. The first license of NASA-developed software, it has now been used in everything from designing next-generation cargo containers, to airframes, rocket engines, ship hulls, and train bodies. The company now has sales of the NASA-derived software topping $4 million a year and has recently received several Small Business Innovation Research (SBIR) contracts to apply its software to nearly all aspects of the new Orion crew capsule design.

  14. 18 CFR 4.4 - Service of report.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... PROJECT COSTS Determination of Cost of Projects Constructed Under License § 4.4 Service of report. Copies... project is located, and to such other parties as the Commission shall prescribe, and the report will be...

  15. 18 CFR 4.4 - Service of report.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... PROJECT COSTS Determination of Cost of Projects Constructed Under License § 4.4 Service of report. Copies... project is located, and to such other parties as the Commission shall prescribe, and the report will be...

  16. 18 CFR 4.4 - Service of report.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... PROJECT COSTS Determination of Cost of Projects Constructed Under License § 4.4 Service of report. Copies... project is located, and to such other parties as the Commission shall prescribe, and the report will be...

  17. 18 CFR 4.4 - Service of report.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... PROJECT COSTS Determination of Cost of Projects Constructed Under License § 4.4 Service of report. Copies... project is located, and to such other parties as the Commission shall prescribe, and the report will be...

  18. Maintaining Indoor Environmental Quality (IEQ) during Construction and Renovation

    MedlinePlus

    ... and licensed contractors are required to conduct renovation. Biological Materials Chronic dampness from water intrusion leads to ... require special precautions prior to demolition to prevent biological dusts from dispersing in the occupied space. Another ...

  19. 76 FR 72982 - Cable Statutory License: Specialty Station List; Correction

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-28

    ...: Ben Golant, Assistant General Counsel, Copyright GC/I&R, P.O. Box 70400, Southwest Station, Washington... objection (no evidence of construction or the type of programming broadcast should not be identified as...

  20. The Development and Validation of the Client Expectations of Massage Scale

    PubMed Central

    Boulanger, Karen T.; Campo, Shelly; Glanville, Jennifer L.; Lowe, John B; Yang, Jingzhen

    2012-01-01

    Background: Although there is evidence that client expectations influence client outcomes, a valid and reliable scale for measuring the range of client expectations for both massage therapy and the behaviors of their massage therapists does not exist. Understanding how client expectations influence client outcomes would provide insight into how massage achieves its reported effects. Purpose: To develop and validate the Client Expectations of Massage Scale (CEMS), a measure of clients’ clinical, educational, interpersonal, and outcome expectations. Setting: Offices of licensed massage therapists in Iowa. Research Design: A practice-based research methodology was used to collect data from two samples of massage therapy clients. For Sample 1, 21 volunteer massage therapists collected data from their clients before the massage. Factor analysis was conducted to test construct validity and coefficient alpha was used to assess reliability. Correlational analyses with the CEMS, previous measures of client expectations, and the Life Orientation Test–Revised were examined to test the convergent and discriminant validity of the CEMS. For Sample 2, 24 massage therapists distributed study materials for clients to complete before and after a massage therapy session. Structural equation modeling was used to assess the construct, discriminant, and predictive validity of the CEMS. Participants: Sample 1 involved 320 and Sample 2 involved 321 adult massage clients. Intervention: Standard care provided by licensed massage therapists. Main Outcomes: Numeric Rating Scale for pain and Positive and Negative Affect Schedule–Revised (including the Serenity subscale). Results: The CEMS demonstrated good construct, convergent, discriminant and predictive validity, and adequate reliability. Client expectations were generally positive toward massage and their massage therapists. Positive outcome expectations had a positive effect on clients’ changes in pain and serenity. High interpersonal expectations had a negative effect on clients’ changes in serenity. Conclusions: Client expectations contribute to the nonspecific effects of massage therapy. PMID:23087774

  1. Design, permitting, and construction issues associated with closure of the Panna Maria uranium tailings impoundment

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Strachan, C.L.; Raabe, K.L.

    1997-12-31

    In 1992, Panna Maria Uranium Operations (PMUO) initiated licensing and engineering activities for closure of the Panna Maria mill and 150-acre tailings impoundment located in southeast Texas. Closure of the tailings impoundment is permitted by license amendment through the Texas Natural Resources Conservation Commission (TNRCC), and based on closure criteria outlined in Texas regulations. The closure plan for the Panna Maria tailings impoundment was submitted for Texas regulatory agency review in April 1993, with details of the closure plan modified in 1994, 1995, and 1996. The closure plan included a multi-layered cover over the regraded tailings surface which was designedmore » for long-term isolation of tailings, reduction of radon emanation to regulated levels, and reduction of infiltration to TNRCC-accepted levels. The cover and embankment slope surfaces and surrounding areas were designed to provide acceptable erosional stability as compared to runoff velocities from the Probable Maximum Precipitation event. Cover materials were selected from on-site materials and evaluated for suitability based on permeability, radon attenuation, and soil dispersivity characteristics. Off-site materials were used when necessary. The cover over the tailings has a maximum slope of 0.5 percent, and the regraded embankment slopes outside the perimeter of the impoundment have a maximum slope of 20 percent. All reclaimed slopes are covered with topsoil and revegetated. A riprap-lined channel is to be used to convey runoff from within the perimeter of the reclaimed impoundment to the north of the impoundment.« less

  2. Automated management of radioactive sources in Saudi Arabia

    NASA Astrophysics Data System (ADS)

    Al-Kheliewi, Abdullah S.; Jamil, M. F.; Basar, M. R.; Tuwaili, W. R.

    2014-09-01

    For usage of radioactive substances, any facility has to register and take license from relevant authority of the country in which such facility is operating. In the Kingdom of Saudi Arabia (KSA), the authority for managing radioactive sources and providing licenses to organizations for its usage is the National Center of Radiation Protection (NCRP). This paper describes the system that automates registration and licensing process of the National Center of Radiation Protection. To provide 24×7 accesses to all the customers of NCRP, system is developed as web-based application that provide facility to online register, request license, renew license, check request status, view historical data and reports etc. and other features are provided as Electronic Services that would be accessible to users via internet. The system also was designed to streamline and optimize internal operations of NCRP besides providing ease of access to its customers by implementing a defined workflow through which every registration and license request will be routed. In addition to manual payment option, the system would also be integrated with SADAD (online payment system) that will avoid lengthy and cumbersome procedures associated with manual payment mechanism. Using SADAD payment option license fee could be paid through internet/ATM machine or branch of any designated bank, Payment will be instantly notified to NCRP hence delay in funds transfer and verification of invoice could be avoided, SADAD integration is discussed later in the document.

  3. 10 CFR 70.81 - Modification and revocation of licenses.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... application, or for failure to construct or operate a facility in accordance with the terms of the... extreme importance to the national defense or security, or to the health and safety of the public, the...

  4. 47 CFR 1.2102 - Eligibility of applications for competitive bidding.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... to the public; (2) Initial licenses or construction permits for digital television service given to... applications filed after July 26, 1993, in the Interactive Video Data Service (see 47 CFR part 95, subpart F...

  5. 18 CFR 4.6 - Burden of proof.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... PROJECT COSTS Determination of Cost of Projects Constructed Under License § 4.6 Burden of proof. The burden of proof to sustain each item of claimed cost shall be upon the licensee and only such items as...

  6. 18 CFR 4.6 - Burden of proof.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... PROJECT COSTS Determination of Cost of Projects Constructed Under License § 4.6 Burden of proof. The burden of proof to sustain each item of claimed cost shall be upon the licensee and only such items as...

  7. 18 CFR 4.6 - Burden of proof.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... PROJECT COSTS Determination of Cost of Projects Constructed Under License § 4.6 Burden of proof. The burden of proof to sustain each item of claimed cost shall be upon the licensee and only such items as...

  8. 18 CFR 4.6 - Burden of proof.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... PROJECT COSTS Determination of Cost of Projects Constructed Under License § 4.6 Burden of proof. The burden of proof to sustain each item of claimed cost shall be upon the licensee and only such items as...

  9. 18 CFR 4.6 - Burden of proof.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... PROJECT COSTS Determination of Cost of Projects Constructed Under License § 4.6 Burden of proof. The burden of proof to sustain each item of claimed cost shall be upon the licensee and only such items as...

  10. Geoscience parameter data base handbook: granites and basalts

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1979-12-01

    The Department of Energy has the responsibility for selecting and constructing Federal repositories for radioactive waste. The Nuclear Regulatory Commission must license such repositories prior to construction. The basic requirement in the geologic disposal of radioactive waste is stated as: placement in a geologic host whereby the radioactive waste is not in mechanical, thermal or chemical equilibrium with the object of preventing physical or chemical migration of radionuclides into the biosphere or hydrosphere in hazardous concentration (USGS, 1977). The object of this report is to document the known geologic parameters of large granite and basalt occurrences in the coterminous Unitedmore » States, for future evaluation in the selection and licensing of radioactive waste repositories. The description of the characteristics of certain potential igneous hosts has been limited to existing data pertaining to the general geologic character, geomechanics, and hydrology of identified occurrences. A description of the geochemistry is the subject of a separate report.« less

  11. Performance of Men and Women on Multiple-Choice and Constructed-Response Tests for Beginning Teachers. Research Report. ETS RR-04-48

    ERIC Educational Resources Information Center

    Livingston, Samuel A.; Rupp, Stacie L.

    2004-01-01

    Some previous research results imply that women tend to perform better, relative to men, on constructed-response (CR) tests than on multiple-choice (MC) tests in the same subjects. An analysis of data from several tests used in the licensing of beginning teachers supported this hypothesis, to varying degrees, in most of the tests investigated. The…

  12. Evolving the Land Information System into a Cloud Computing Service

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Houser, Paul R.

    The Land Information System (LIS) was developed to use advanced flexible land surface modeling and data assimilation frameworks to integrate extremely large satellite- and ground-based observations with advanced land surface models to produce continuous high-resolution fields of land surface states and fluxes. The resulting fields are extremely useful for drought and flood assessment, agricultural planning, disaster management, weather and climate forecasting, water resources assessment, and the like. We envisioned transforming the LIS modeling system into a scientific cloud computing-aware web and data service that would allow clients to easily setup and configure for use in addressing large water management issues.more » The focus of this Phase 1 project was to determine the scientific, technical, commercial merit and feasibility of the proposed LIS-cloud innovations that are currently barriers to broad LIS applicability. We (a) quantified the barriers to broad LIS utility and commercialization (high performance computing, big data, user interface, and licensing issues); (b) designed the proposed LIS-cloud web service, model-data interface, database services, and user interfaces; (c) constructed a prototype LIS user interface including abstractions for simulation control, visualization, and data interaction, (d) used the prototype to conduct a market analysis and survey to determine potential market size and competition, (e) identified LIS software licensing and copyright limitations and developed solutions, and (f) developed a business plan for development and marketing of the LIS-cloud innovation. While some significant feasibility issues were found in the LIS licensing, overall a high degree of LIS-cloud technical feasibility was found.« less

  13. On-site monitoring of construction of Terror Lake hydroelectric project, Kodiak, Alaska. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hosking, H.

    The report describes the effort by the Fish and Wildlife Service to monitor the construction of the first hydroelectric project built on national wildlife refuge lands under license by the Federal Energy Regulatory Commission. Recommendations are offered for use in planning other projects. Fish and wildlife species of concern included brown bears, Sitka black-tailed deer, mountain goats, raptors (including bald eagles), and several species of salmonid fish. Construction practices relating to erosion control, contaminant management, culvert placement, and siting of project structures are covered.

  14. A Research on Mathematical Thinking Skills: Mathematical Thinking Skills of Athletes in Individual and Team Sports

    ERIC Educational Resources Information Center

    Onal, Halil; Inan, Mehmet; Bozkurt, Sinan

    2017-01-01

    The aim of this research is to examine the mathematical thinking skills of licensed athletes engaged in individual and team sports. The research is designed as a survey model. The sample of the research is composed of 59 female and 170 male licensed athletes (n = 229) and (aged 14 to 52) licensed who do the sports of shooting, billiards, archery,…

  15. 77 FR 47441 - Agency Information Collection Activities: Submission for the Office of Management and Budget (OMB...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-08

    ... permit, operating license, operating license renewal, early site review, design certification review... available on the NRC home page site for 60 days after the signature date of this notice. Comments and...

  16. US EPA SmartWay License Agreement

    EPA Pesticide Factsheets

    This SmartWay Tractor and Trailer trademark license agreement is for manufacturers who intend to display the SmartWay designated logo (brand) in the interior of eligible trucks and trailers (e.g. having met the SmartWay specifications established by EPA).

  17. 78 FR 57180 - Biweekly Notice; Applications and Amendments to Facility Operating Licenses and Combined Licenses...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-17

    ... controverted. In addition, the requestor/petitioner shall provide a brief explanation of the bases for the... accident previously evaluated? Response: No The design function of the WLS is containment isolation and the...

  18. Current and anticipated use of thermal-hydraulic codes for BWR transient and accident analyses in Japan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Arai, Kenji; Ebata, Shigeo

    1997-07-01

    This paper summarizes the current and anticipated use of the thermal-hydraulic and neutronic codes for the BWR transient and accident analyses in Japan. The codes may be categorized into the licensing codes and the best estimate codes for the BWR transient and accident analyses. Most of the licensing codes have been originally developed by General Electric. Some codes have been updated based on the technical knowledge obtained in the thermal hydraulic study in Japan, and according to the BWR design changes. The best estimates codes have been used to support the licensing calculations and to obtain the phenomenological understanding ofmore » the thermal hydraulic phenomena during a BWR transient or accident. The best estimate codes can be also applied to a design study for a next generation BWR to which the current licensing model may not be directly applied. In order to rationalize the margin included in the current BWR design and develop a next generation reactor with appropriate design margin, it will be required to improve the accuracy of the thermal-hydraulic and neutronic model. In addition, regarding the current best estimate codes, the improvement in the user interface and the numerics will be needed.« less

  19. 47 CFR 1.10014 - What happens after officially filing my application?

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... ARC-xxxxx Foreign Carrier Affiliation Notification FCN-xxxxx International High Frequency IHF-xxxxx... PN released International High Frequency IHF-xxxxx International Public Fixed IPF-xxxxx Recognized... Foreign Carrier Affiliation Notification. International High Frequency: Construction Permits,Licenses...

  20. 47 CFR 1.10014 - What happens after officially filing my application?

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... ARC-xxxxx Foreign Carrier Affiliation Notification FCN-xxxxx International High Frequency IHF-xxxxx... PN released International High Frequency IHF-xxxxx International Public Fixed IPF-xxxxx Recognized... Foreign Carrier Affiliation Notification. International High Frequency: Construction Permits,Licenses...

  1. Sandia National Laboratories: Sandia National Laboratories: Missions:

    Science.gov Websites

    ; Security Weapons Science & Technology Defense Systems & Assessments About Defense Systems & ; Development Technology Deployment Centers Working With Sandia Working With Sandia Prospective Suppliers What Information Construction & Facilities Contract Audit Sandia's Economic Impact Licensing & Technology

  2. Sandia National Laboratories: National Security Missions: International

    Science.gov Websites

    ; Security Weapons Science & Technology Defense Systems & Assessments About Defense Systems & ; Development Technology Deployment Centers Working With Sandia Working With Sandia Prospective Suppliers What Information Construction & Facilities Contract Audit Sandia's Economic Impact Licensing & Technology

  3. 78 FR 73897 - SHINE Medical Technologies, Inc.

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-09

    ... NUCLEAR REGULATORY COMMISSION [Docket No. 50-608; NRC-2013-0053] SHINE Medical Technologies, Inc. AGENCY: Nuclear Regulatory Commission. ACTION: License application; docketing. SUMMARY: The U.S. Nuclear... construction permit, submitted by SHINE Medical Technologies, Inc. (SHINE) is acceptable for docketing...

  4. Towards a human oral vaccine for anthrax: the utility of a Salmonella Typhi Ty21a-based prime boost immunization strategy

    PubMed Central

    Baillie, Leslie W.J.; Rodriguez, Ana L.; Moore, Stephen; Atkins, Helen S.; Feng, Chiguang; Nataro, James P.; Pasetti, Marcela F.

    2008-01-01

    We previously demonstrated the ability of an orally administered attenuated Salmonella enterica serovar Typhimurium strain expressing the protective antigen (PA) of Bacillus anthracis to confer protection against lethal anthrax aerosol spore challenge [1]. To extend the utility of this approach to humans we constructed variants of S. enterica serovar Typhi Ty21a, an attenuated typhoid vaccine strain licensed for human use, which expressed and exported PA via two distinct plasmid-based transport systems: the Escherichia coli HlyA haemolysin and the S. Typhi ClyA export apparatus. Murine immunogenicity studies confirmed the ability of these constructs, especially Ty21a expressing the ClyA-PA fusion protein, to stimulate strong PA-specific immune responses following intranasal immunization. These responses were further enhanced by a subsequent boost with either parenterally delivered recombinant PA or the licensed US human alum-adsorbed anthrax vaccine (AVA). Anthrax toxin neutralizing antibody responses using this prime-boost regimen were rapid, vigorous and broad in nature. The results of this study demonstrate the feasibility of employing a mucosal prime with a licensed Salmonella Typhi vaccine strain followed by a parenteral protein boost to stimulate rapid protective immunity against anthrax. PMID:18805452

  5. SU-F-E-10: Student-Driven Exploration of Radiographic Material Properties, Phantom Construction, and Clinical Workflows Or: The Extraordinary Life of CANDY MAN

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Mahon, RN; Riblett, MJ; Hugo, GD

    Purpose: To develop a hands-on learning experience that explores the radiological and structural properties of everyday items and applies this knowledge to design a simple phantom for radiotherapy exercises. Methods: Students were asked to compile a list of readily available materials thought to have radiation attenuation properties similar to tissues within the human torso. Participants scanned samples of suggested materials and regions of interest (ROIs) were used to characterize bulk attenuation properties. Properties of each material were assessed via comparison to a Gammex Tissue characterization phantom and used to construct a list of inexpensive near-tissue-equivalent materials. Critical discussions focusing onmore » samples found to differ from student expectations were used to revise and narrow the comprehensive list. From their newly acquired knowledge, students designed and constructed a simple thoracic phantom for use in a simulated clinical workflow. Students were tasked with setting up the phantom and acquiring planning CT images for use in treatment planning and dose delivery. Results: Under engineer and physicist supervision, students were trained to use a CT simulator and acquired images for approximately 60 different foodstuffs, candies, and household items. Through peer discussion, students gained valuable insights and were made to review preconceptions about radiographic material properties. From a subset of imaged materials, a simple phantom was successfully designed and constructed to represent a human thorax. Students received hands-on experience with clinical treatment workflows by learning how to perform CT simulation, create a treatment plan for an embedded tumor, align the phantom for treatment, and deliver a treatment fraction. Conclusion: In this activity, students demonstrated their ability to reason through the radiographic material selection process, construct a simple phantom to specifications, and exercise their knowledge of clinical workflows. Furthermore, the enjoyable and inexpensive nature of this project proved to attract participant interest and drive creative exploration. Mahon and Riblett have nothing to disclose; Hugo has a research agreement with Phillips Medical systems, a license agreement with Varian Medical Systems, research grants from the National Institute of Health. Authors do not have any potential conflicts of interest to disclose.« less

  6. Automated management of radioactive sources in Saudi Arabia

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Al-Kheliewi, Abdullah S.; Jamil, M. F.; Basar, M. R.

    2014-09-30

    For usage of radioactive substances, any facility has to register and take license from relevant authority of the country in which such facility is operating. In the Kingdom of Saudi Arabia (KSA), the authority for managing radioactive sources and providing licenses to organizations for its usage is the National Center of Radiation Protection (NCRP). This paper describes the system that automates registration and licensing process of the National Center of Radiation Protection. To provide 24×7 accesses to all the customers of NCRP, system is developed as web-based application that provide facility to online register, request license, renew license, check requestmore » status, view historical data and reports etc. and other features are provided as Electronic Services that would be accessible to users via internet. The system also was designed to streamline and optimize internal operations of NCRP besides providing ease of access to its customers by implementing a defined workflow through which every registration and license request will be routed. In addition to manual payment option, the system would also be integrated with SADAD (online payment system) that will avoid lengthy and cumbersome procedures associated with manual payment mechanism. Using SADAD payment option license fee could be paid through internet/ATM machine or branch of any designated bank, Payment will be instantly notified to NCRP hence delay in funds transfer and verification of invoice could be avoided, SADAD integration is discussed later in the document.« less

  7. 10 CFR 55.4 - Definitions.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... means testing conducted to verify a simulation facility's performance as compared to actual or predicted... which a simulation facility's control room configuration, system control arrangement, and design data... of a facility and to direct the licensed activities of licensed operators. Simulation facility means...

  8. 10 CFR 55.4 - Definitions.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... means testing conducted to verify a simulation facility's performance as compared to actual or predicted... which a simulation facility's control room configuration, system control arrangement, and design data... of a facility and to direct the licensed activities of licensed operators. Simulation facility means...

  9. 10 CFR 55.4 - Definitions.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... means testing conducted to verify a simulation facility's performance as compared to actual or predicted... which a simulation facility's control room configuration, system control arrangement, and design data... of a facility and to direct the licensed activities of licensed operators. Simulation facility means...

  10. 10 CFR 52.93 - Exemptions and variances.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... referencing a nuclear power reactor manufactured under a manufacturing license issued under subpart F of this... NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSES, CERTIFICATIONS, AND APPROVALS FOR NUCLEAR POWER PLANTS..., site parameters, terms and conditions, or approved design of the manufactured reactor. The Commission...

  11. 10 CFR 61.13 - Technical analyses.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... REGULATORY COMMISSION (CONTINUED) LICENSING REQUIREMENTS FOR LAND DISPOSAL OF RADIOACTIVE WASTE Licenses § 61... characteristics and design features in isolating and segregating the wastes. The analyses must clearly demonstrate... inadvertent intrusion must include demonstration that there is reasonable assurance the waste classification...

  12. 10 CFR 61.13 - Technical analyses.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... REGULATORY COMMISSION (CONTINUED) LICENSING REQUIREMENTS FOR LAND DISPOSAL OF RADIOACTIVE WASTE Licenses § 61... characteristics and design features in isolating and segregating the wastes. The analyses must clearly demonstrate... inadvertent intrusion must include demonstration that there is reasonable assurance the waste classification...

  13. 10 CFR 61.13 - Technical analyses.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... REGULATORY COMMISSION (CONTINUED) LICENSING REQUIREMENTS FOR LAND DISPOSAL OF RADIOACTIVE WASTE Licenses § 61... characteristics and design features in isolating and segregating the wastes. The analyses must clearly demonstrate... inadvertent intrusion must include demonstration that there is reasonable assurance the waste classification...

  14. 10 CFR 61.13 - Technical analyses.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... REGULATORY COMMISSION (CONTINUED) LICENSING REQUIREMENTS FOR LAND DISPOSAL OF RADIOACTIVE WASTE Licenses § 61... characteristics and design features in isolating and segregating the wastes. The analyses must clearly demonstrate... inadvertent intrusion must include demonstration that there is reasonable assurance the waste classification...

  15. A real-time all-atom structural search engine for proteins.

    PubMed

    Gonzalez, Gabriel; Hannigan, Brett; DeGrado, William F

    2014-07-01

    Protein designers use a wide variety of software tools for de novo design, yet their repertoire still lacks a fast and interactive all-atom search engine. To solve this, we have built the Suns program: a real-time, atomic search engine integrated into the PyMOL molecular visualization system. Users build atomic-level structural search queries within PyMOL and receive a stream of search results aligned to their query within a few seconds. This instant feedback cycle enables a new "designability"-inspired approach to protein design where the designer searches for and interactively incorporates native-like fragments from proven protein structures. We demonstrate the use of Suns to interactively build protein motifs, tertiary interactions, and to identify scaffolds compatible with hot-spot residues. The official web site and installer are located at http://www.degradolab.org/suns/ and the source code is hosted at https://github.com/godotgildor/Suns (PyMOL plugin, BSD license), https://github.com/Gabriel439/suns-cmd (command line client, BSD license), and https://github.com/Gabriel439/suns-search (search engine server, GPLv2 license).

  16. 47 CFR 1.10014 - What happens after officially filing my application?

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... Frequency IHF-xxxxx. Recognized Operating Agency ROA-xxxxx. Satellite Space Station SAT-xxxxx. Satellite... PN released. International High Frequency IHF-xxxxx. Recognized Operating Agency No action taken PN... Carrier Affiliation Notification. International High Frequency: Construction Permits, Licenses...

  17. 47 CFR 1.10014 - What happens after officially filing my application?

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... Frequency IHF-xxxxx. Recognized Operating Agency ROA-xxxxx. Satellite Space Station SAT-xxxxx. Satellite... PN released. International High Frequency IHF-xxxxx. Recognized Operating Agency No action taken PN... Carrier Affiliation Notification. International High Frequency: Construction Permits, Licenses...

  18. 47 CFR 1.10014 - What happens after officially filing my application?

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... Frequency IHF-xxxxx. Recognized Operating Agency ROA-xxxxx. Satellite Space Station SAT-xxxxx. Satellite... PN released. International High Frequency IHF-xxxxx. Recognized Operating Agency No action taken PN... Carrier Affiliation Notification. International High Frequency: Construction Permits, Licenses...

  19. Direct, Operational Field Test Evaluation, Human Factors

    DOT National Transportation Integrated Search

    1998-08-01

    IN THIS EXPERIMENT, 32 LICENSED DRIVERS (16 YOUNG, 16 OLD) DROVE ON AN EXPRESSWAY. ON EACH TRIAL (96 PER SUBJECT), 1 TO 3 TRAFFIC MESSAGES CONTAINING 6 TO 14 ITEMS WERE PRESENTED. (L-94 EASTBOUND AT SOUTHFIELD FREEWAY, CONTINUING CONSTRUCTION, RIGHT ...

  20. 75 FR 39667 - Availability for Non-Exclusive or Partially Exclusive Licensing of a U.S. Patent Application

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-12

    ... Serial No. 11/132,199, entitled ``Construction of Live Attenuated Shigella Vaccine Strains that Express... proteins in Shigella spp. without affecting the ability of the Shigella strain to invade cells of the...

  1. 10 CFR 60.15 - Site characterization.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... in situ testing before and during construction shall be planned and coordinated with geologic... REGULATORY COMMISSION (CONTINUED) DISPOSAL OF HIGH-LEVEL RADIOACTIVE WASTES IN GEOLOGIC REPOSITORIES Licenses... be described in such application. (b) Unless the Commission determines with respect to the site...

  2. 10 CFR 60.15 - Site characterization.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... in situ testing before and during construction shall be planned and coordinated with geologic... REGULATORY COMMISSION (CONTINUED) DISPOSAL OF HIGH-LEVEL RADIOACTIVE WASTES IN GEOLOGIC REPOSITORIES Licenses... be described in such application. (b) Unless the Commission determines with respect to the site...

  3. 10 CFR 60.15 - Site characterization.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... in situ testing before and during construction shall be planned and coordinated with geologic... REGULATORY COMMISSION (CONTINUED) DISPOSAL OF HIGH-LEVEL RADIOACTIVE WASTES IN GEOLOGIC REPOSITORIES Licenses... be described in such application. (b) Unless the Commission determines with respect to the site...

  4. 10 CFR 60.15 - Site characterization.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... in situ testing before and during construction shall be planned and coordinated with geologic... REGULATORY COMMISSION (CONTINUED) DISPOSAL OF HIGH-LEVEL RADIOACTIVE WASTES IN GEOLOGIC REPOSITORIES Licenses... be described in such application. (b) Unless the Commission determines with respect to the site...

  5. A Compact Multiphoton 3D Imaging System for Recording Fast Neuronal Activity

    PubMed Central

    Vučinić, Dejan; Sejnowski, Terrence J.

    2007-01-01

    We constructed a simple and compact imaging system designed specifically for the recording of fast neuronal activity in a 3D volume. The system uses an Yb:KYW femtosecond laser we designed for use with acousto-optic deflection. An integrated two-axis acousto-optic deflector, driven by digitally synthesized signals, can target locations in three dimensions. Data acquisition and the control of scanning are performed by a LeCroy digital oscilloscope. The total cost of construction was one order of magnitude lower than that of a typical Ti:sapphire system. The entire imaging apparatus, including the laser, fits comfortably onto a small rig for electrophysiology. Despite the low cost and simplicity, the convergence of several new technologies allowed us to achieve the following capabilities: i) full-frame acquisition at video rates suitable for patch clamping; ii) random access in under ten microseconds with dwelling ability in the nominal focal plane; iii) three-dimensional random access with the ability to perform fast volume sweeps at kilohertz rates; and iv) fluorescence lifetime imaging. We demonstrate the ability to record action potentials with high temporal resolution using intracellularly loaded potentiometric dye di-2-ANEPEQ. Our design proffers easy integration with electrophysiology and promises a more widespread adoption of functional two-photon imaging as a tool for the study of neuronal activity. The software and firmware we developed is available for download at http://neurospy.org/ under an open source license. PMID:17684546

  6. TinkerCell: modular CAD tool for synthetic biology.

    PubMed

    Chandran, Deepak; Bergmann, Frank T; Sauro, Herbert M

    2009-10-29

    Synthetic biology brings together concepts and techniques from engineering and biology. In this field, computer-aided design (CAD) is necessary in order to bridge the gap between computational modeling and biological data. Using a CAD application, it would be possible to construct models using available biological "parts" and directly generate the DNA sequence that represents the model, thus increasing the efficiency of design and construction of synthetic networks. An application named TinkerCell has been developed in order to serve as a CAD tool for synthetic biology. TinkerCell is a visual modeling tool that supports a hierarchy of biological parts. Each part in this hierarchy consists of a set of attributes that define the part, such as sequence or rate constants. Models that are constructed using these parts can be analyzed using various third-party C and Python programs that are hosted by TinkerCell via an extensive C and Python application programming interface (API). TinkerCell supports the notion of a module, which are networks with interfaces. Such modules can be connected to each other, forming larger modular networks. TinkerCell is a free and open-source project under the Berkeley Software Distribution license. Downloads, documentation, and tutorials are available at http://www.tinkercell.com. An ideal CAD application for engineering biological systems would provide features such as: building and simulating networks, analyzing robustness of networks, and searching databases for components that meet the design criteria. At the current state of synthetic biology, there are no established methods for measuring robustness or identifying components that fit a design. The same is true for databases of biological parts. TinkerCell's flexible modeling framework allows it to cope with changes in the field. Such changes may involve the way parts are characterized or the way synthetic networks are modeled and analyzed computationally. TinkerCell can readily accept third-party algorithms, allowing it to serve as a platform for testing different methods relevant to synthetic biology.

  7. TinkerCell: modular CAD tool for synthetic biology

    PubMed Central

    Chandran, Deepak; Bergmann, Frank T; Sauro, Herbert M

    2009-01-01

    Background Synthetic biology brings together concepts and techniques from engineering and biology. In this field, computer-aided design (CAD) is necessary in order to bridge the gap between computational modeling and biological data. Using a CAD application, it would be possible to construct models using available biological "parts" and directly generate the DNA sequence that represents the model, thus increasing the efficiency of design and construction of synthetic networks. Results An application named TinkerCell has been developed in order to serve as a CAD tool for synthetic biology. TinkerCell is a visual modeling tool that supports a hierarchy of biological parts. Each part in this hierarchy consists of a set of attributes that define the part, such as sequence or rate constants. Models that are constructed using these parts can be analyzed using various third-party C and Python programs that are hosted by TinkerCell via an extensive C and Python application programming interface (API). TinkerCell supports the notion of a module, which are networks with interfaces. Such modules can be connected to each other, forming larger modular networks. TinkerCell is a free and open-source project under the Berkeley Software Distribution license. Downloads, documentation, and tutorials are available at . Conclusion An ideal CAD application for engineering biological systems would provide features such as: building and simulating networks, analyzing robustness of networks, and searching databases for components that meet the design criteria. At the current state of synthetic biology, there are no established methods for measuring robustness or identifying components that fit a design. The same is true for databases of biological parts. TinkerCell's flexible modeling framework allows it to cope with changes in the field. Such changes may involve the way parts are characterized or the way synthetic networks are modeled and analyzed computationally. TinkerCell can readily accept third-party algorithms, allowing it to serve as a platform for testing different methods relevant to synthetic biology. PMID:19874625

  8. 42 CFR 431.707 - Standards.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... be met by individuals in order to be licensed as a nursing home administrator. (b) The standards must be designed to insure that nursing home administrators are— (1) Of good character; (2) Otherwise... ASSISTANCE PROGRAMS STATE ORGANIZATION AND GENERAL ADMINISTRATION State Programs for Licensing Nursing Home...

  9. 42 CFR 431.707 - Standards.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... ASSISTANCE PROGRAMS STATE ORGANIZATION AND GENERAL ADMINISTRATION State Programs for Licensing Nursing Home... be met by individuals in order to be licensed as a nursing home administrator. (b) The standards must be designed to insure that nursing home administrators are— (1) Of good character; (2) Otherwise...

  10. Persuasion to use personal protective equipment in constructing subway stations: application of social marketing.

    PubMed

    Shamsi, Mahmoud; Pariani, Abbas; Shams, Mohsen; Soleymani-nejad, Marzieh

    2016-04-01

    To study the effects of an intervention based on social marketing to persuade workers to use personal protective equipment (PPE) in constructing subway stations in Isfahan, Iran. This was a quasi-experimental study. Two stations were selected as intervention and control groups. Intervention was designed based on results of a formative research. A free package containing a safety helmet with a tailored message affixed to it, mask and gloves and an educational pamphlet was delivered to the intervention group. After 6 weeks, behaviours in the intervention and control stations were measured using an observational checklist. After the intervention, the percentage of workers who used PPE at the intervention station increased significantly. OR for helmet and mask usage was 7.009 and 2.235, respectively, in the intervention group. Social marketing can be used to persuade workers to use PPE in the workplace. Published by the BMJ Publishing Group Limited. For permission to use (where not already granted under a licence) please go to http://www.bmj.com/company/products-services/rights-and-licensing/

  11. Development and program implementation of elements for identification of the electromagnet condition for movable element position control

    NASA Astrophysics Data System (ADS)

    Leukhin, R. I.; Shaykhutdinov, D. V.; Shirokov, K. M.; Narakidze, N. D.; Vlasov, A. S.

    2017-02-01

    Developing the experimental design of new electromagnetic constructions types in engineering industry enterprises requires solutions of two major problems: regulator’s parameters setup and comprehensive testing of electromagnets. A weber-ampere characteristic as a data source for electromagnet condition identification was selected. Present article focuses on development and implementation of the software for electromagnetic drive control system based on the weber-ampere characteristic measuring. The software for weber-ampere characteristic data processing based on artificial neural network is developed. Results of the design have been integrated into the program code in LabVIEW environment. The license package of LabVIEW graphic programming was used. The hardware is chosen and possibility of its use for control system implementation was proved. The trained artificial neural network defines electromagnetic drive effector position with minimal error. Developed system allows to control the electromagnetic drive powered by the voltage source, the current source and hybrid sources.

  12. NUCLEAR NEW BUILD-INTEGRATING CULTURAL DIFFERENCES IN RADIATION PROTECTION.

    PubMed

    Haemmerli, Valentin; Bryant, Peter A; Cole, Peter

    2017-04-01

    Across the world, we are seeing a resurgence in Nuclear New Build. In the UK alone, plans are under way for the construction of 10 new reactors, using 4 different reactor designs all of which are to be provided by foreign vendors, and operated by 3 newly formed licensees within the UK. As these new licensees embark on the task of establishing themselves and progressing the design and build of these reactors, there are challenges faced in integrating the Radiation Protection Requirements and Culture from the various Foreign Investors and Vendors into the UK 'Context'. The following paper identifies the origin of the Radiation Protection Requirements within the UK and foreign investor/vendor countries, in an attempt to integrate them into the UK licensing and approval process. Thus, allowing due credit to be taken for the regulatory regime of the foreign countries where these reactors originate. © The Author 2016. Published by Oxford University Press. All rights reserved. For Permissions, please email: journals.permissions@oup.com.

  13. Chinese License Plates Recognition Method Based on A Robust and Efficient Feature Extraction and BPNN Algorithm

    NASA Astrophysics Data System (ADS)

    Zhang, Ming; Xie, Fei; Zhao, Jing; Sun, Rui; Zhang, Lei; Zhang, Yue

    2018-04-01

    The prosperity of license plate recognition technology has made great contribution to the development of Intelligent Transport System (ITS). In this paper, a robust and efficient license plate recognition method is proposed which is based on a combined feature extraction model and BPNN (Back Propagation Neural Network) algorithm. Firstly, the candidate region of the license plate detection and segmentation method is developed. Secondly, a new feature extraction model is designed considering three sets of features combination. Thirdly, the license plates classification and recognition method using the combined feature model and BPNN algorithm is presented. Finally, the experimental results indicate that the license plate segmentation and recognition both can be achieved effectively by the proposed algorithm. Compared with three traditional methods, the recognition accuracy of the proposed method has increased to 95.7% and the consuming time has decreased to 51.4ms.

  14. Achieving Better Buying Power through Acquisition of Open Architecture Software Systems. Volume 2 Understanding Open Architecture Software Systems: Licensing and Security Research and Recommendations

    DTIC Science & Technology

    2016-01-06

    of- breed software components and software products lines (SPLs) that are subject to different IP license and cybersecurity requirements. The... commercially priced closed source software components, to be used in the design, implementation, deployment, and evolution of open architecture (OA... breed software components and software products lines (SPLs) that are subject to different IP license and cybersecurity requirements. The Department

  15. 10 CFR 40.5 - Communications.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 1 2010-01-01 2010-01-01 false Communications. 40.5 Section 40.5 Energy NUCLEAR REGULATORY COMMISSION DOMESTIC LICENSING OF SOURCE MATERIAL General Provisions § 40.5 Communications. (a... Administrators. (ii) Health and safety design review of sealed sources and devices and approval, for licensing...

  16. 75 FR 76757 - Licensing Support System Advisory Review Panel

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-09

    ... provide advice on the fundamental issues of design and development of an electronic information management... electronic information management system was known as the Licensing Support System (LSS). In November, 1998... experience in electronic information management systems may also participate on the Panel. The Nuclear...

  17. 10 CFR 2.105 - Notice of proposed action.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... NUCLEAR REGULATORY COMMISSION RULES OF PRACTICE FOR DOMESTIC LICENSING PROCEEDINGS AND ISSUANCE OF ORDERS Procedure for Issuance, Amendment, Transfer, or Renewal of a License, and Standard Design Approval Hearing... within the time prescribed in the notice, the Director, Office of Nuclear Reactor Regulation, Director...

  18. 10 CFR 2.105 - Notice of proposed action.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... NUCLEAR REGULATORY COMMISSION RULES OF PRACTICE FOR DOMESTIC LICENSING PROCEEDINGS AND ISSUANCE OF ORDERS Procedure for Issuance, Amendment, Transfer, or Renewal of a License, and Standard Design Approval Hearing... within the time prescribed in the notice, the Director, Office of Nuclear Reactor Regulation, Director...

  19. 76 FR 39132 - Agency Information Collection Activities: Proposed Collection; Comment Request

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-05

    ... objects or materials for a variety of purposes in research, industry, and other fields. The subparts cover specific requirements for obtaining a license or license exemption, design and performance criteria for... training, written operating and emergency procedures, personnel monitoring, radiation surveys, inspection...

  20. 10 CFR 61.16 - Other information.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... REGULATORY COMMISSION (CONTINUED) LICENSING REQUIREMENTS FOR LAND DISPOSAL OF RADIOACTIVE WASTE Licenses § 61.16 Other information. Depending upon the nature of the wastes to be disposed of, and the design and proposed operation of the land disposal facility, additional information may be requested by the Commission...

  1. 10 CFR 61.16 - Other information.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... REGULATORY COMMISSION (CONTINUED) LICENSING REQUIREMENTS FOR LAND DISPOSAL OF RADIOACTIVE WASTE Licenses § 61.16 Other information. Depending upon the nature of the wastes to be disposed of, and the design and proposed operation of the land disposal facility, additional information may be requested by the Commission...

  2. 10 CFR 61.16 - Other information.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... REGULATORY COMMISSION (CONTINUED) LICENSING REQUIREMENTS FOR LAND DISPOSAL OF RADIOACTIVE WASTE Licenses § 61.16 Other information. Depending upon the nature of the wastes to be disposed of, and the design and proposed operation of the land disposal facility, additional information may be requested by the Commission...

  3. 10 CFR 61.16 - Other information.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... REGULATORY COMMISSION (CONTINUED) LICENSING REQUIREMENTS FOR LAND DISPOSAL OF RADIOACTIVE WASTE Licenses § 61.16 Other information. Depending upon the nature of the wastes to be disposed of, and the design and proposed operation of the land disposal facility, additional information may be requested by the Commission...

  4. 10 CFR 61.16 - Other information.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... REGULATORY COMMISSION (CONTINUED) LICENSING REQUIREMENTS FOR LAND DISPOSAL OF RADIOACTIVE WASTE Licenses § 61.16 Other information. Depending upon the nature of the wastes to be disposed of, and the design and proposed operation of the land disposal facility, additional information may be requested by the Commission...

  5. 47 CFR 1.87 - Modification of license or construction permit on motion of the Commission.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... property is involved, the Commission may by order provide a shorter period of time. (b) The notification... provisions of this section, both the burden of proceeding with the introduction of evidence and the burden of...

  6. TRAINING NUCLEAR TECHNICIANS.

    ERIC Educational Resources Information Center

    KOVNER, EDGAR A.

    PROBLEMS CONFRONTED BY PLANNERS OF NUCLEAR PROGRAMS AT THE TECHNICIAN LEVEL INCLUDE (1) LACK OF PRECEDENT IN CURRICULUM, COURSE OUTLINES, AND GRADUATE PLACEMENT, (2) DIFFICULTY IN DETERMINING COSTS OF LABORATORY CONSTRUCTION, EQUIPMENT, AND OPERATION, AND (3) REQUIREMENT OF ATOMIC ENERGY COMMISSION LICENSES IN NUCLEAR OCCUPATIONS. A 92-SEMESTER…

  7. The UAV and the Current and Future Regulatory Construction for Integration into the National Airspace System

    DTIC Science & Technology

    2005-07-01

    vehicles to deliver mail or packages across town, in a large indoor complex or building, or even to deliver...drugs, marihuana , depressants or stimulants.330 Further, current licenses and certified personnel may have their

  8. 75 FR 22434 - Exelon Nuclear Texas Holdings, LLC; Notice of Receipt and Availability of Application for an...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-28

    ... for a construction permit (CP) or combined license (COL) for a nuclear power facility. The ESP process...), the permit holder may reference the permit in an application for a CP or COL. Subsequent Federal...

  9. 75 FR 6018 - Boyce Hydro Power, LLC; Notice of Application for Amendment of License and Soliciting Comments...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-05

    .... d. Applicant: Boyce Hydro Power, LLC (BHP). e. Name of Project: Edenville Hydroelectric Project. f... construct the footings and first lift of the retaining walls. BHP states that shutting off the bypass flow...

  10. Advanced Reactor Technologies - Regulatory Technology Development Plan (RTDP)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Moe, Wayne L.

    This DOE-NE Advanced Small Modular Reactor (AdvSMR) regulatory technology development plan (RTDP) will link critical DOE nuclear reactor technology development programs to important regulatory and policy-related issues likely to impact a “critical path” for establishing a viable commercial AdvSMR presence in the domestic energy market. Accordingly, the regulatory considerations that are set forth in the AdvSMR RTDP will not be limited to any one particular type or subset of advanced reactor technology(s) but rather broadly consider potential regulatory approaches and the licensing implications that accompany all DOE-sponsored research and technology development activity that deal with commercial non-light water reactors. However,more » it is also important to remember that certain “minimum” levels of design and safety approach knowledge concerning these technology(s) must be defined and available to an extent that supports appropriate pre-licensing regulatory analysis within the RTDP. Final resolution to advanced reactor licensing issues is most often predicated on the detailed design information and specific safety approach as documented in a facility license application and submitted for licensing review. Because the AdvSMR RTDP is focused on identifying and assessing the potential regulatory implications of DOE-sponsored reactor technology research very early in the pre-license application development phase, the information necessary to support a comprehensive regulatory analysis of a new reactor technology, and the resolution of resulting issues, will generally not be available. As such, the regulatory considerations documented in the RTDP should be considered an initial “first step” in the licensing process which will continue until a license is issued to build and operate the said nuclear facility. Because a facility license application relies heavily on the data and information generated by technology development studies, the anticipated regulatory importance of key DOE reactor research initiatives should be assessed early in the technology development process. Quality assurance requirements supportive of later licensing activities must also be attached to important research activities to ensure resulting data is usable in that context. Early regulatory analysis and licensing approach planning thus provides a significant benefit to the formulation of research plans and also enables the planning and development of a compatible AdvSMR licensing framework, should significant modification be required.« less

  11. Advanced Reactor Technology -- Regulatory Technology Development Plan (RTDP)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Moe, Wayne Leland

    This DOE-NE Advanced Small Modular Reactor (AdvSMR) regulatory technology development plan (RTDP) will link critical DOE nuclear reactor technology development programs to important regulatory and policy-related issues likely to impact a “critical path” for establishing a viable commercial AdvSMR presence in the domestic energy market. Accordingly, the regulatory considerations that are set forth in the AdvSMR RTDP will not be limited to any one particular type or subset of advanced reactor technology(s) but rather broadly consider potential regulatory approaches and the licensing implications that accompany all DOE-sponsored research and technology development activity that deal with commercial non-light water reactors. However,more » it is also important to remember that certain “minimum” levels of design and safety approach knowledge concerning these technology(s) must be defined and available to an extent that supports appropriate pre-licensing regulatory analysis within the RTDP. Final resolution to advanced reactor licensing issues is most often predicated on the detailed design information and specific safety approach as documented in a facility license application and submitted for licensing review. Because the AdvSMR RTDP is focused on identifying and assessing the potential regulatory implications of DOE-sponsored reactor technology research very early in the pre-license application development phase, the information necessary to support a comprehensive regulatory analysis of a new reactor technology, and the resolution of resulting issues, will generally not be available. As such, the regulatory considerations documented in the RTDP should be considered an initial “first step” in the licensing process which will continue until a license is issued to build and operate the said nuclear facility. Because a facility license application relies heavily on the data and information generated by technology development studies, the anticipated regulatory importance of key DOE reactor research initiatives should be assessed early in the technology development process. Quality assurance requirements supportive of later licensing activities must also be attached to important research activities to ensure resulting data is usable in that context. Early regulatory analysis and licensing approach planning thus provides a significant benefit to the formulation of research plans and also enables the planning and development of a compatible AdvSMR licensing framework, should significant modification be required.« less

  12. Cognitive Difficulty and Format of Exams Predicts Gender and Socioeconomic Gaps in Exam Performance of Students in Introductory Biology Courses.

    PubMed

    Wright, Christian D; Eddy, Sarah L; Wenderoth, Mary Pat; Abshire, Elizabeth; Blankenbiller, Margaret; Brownell, Sara E

    2016-01-01

    Recent reform efforts in undergraduate biology have recommended transforming course exams to test at more cognitively challenging levels, which may mean including more cognitively challenging and more constructed-response questions on assessments. However, changing the characteristics of exams could result in bias against historically underserved groups. In this study, we examined whether and to what extent the characteristics of instructor-generated tests impact the exam performance of male and female and middle/high- and low-socioeconomic status (SES) students enrolled in introductory biology courses. We collected exam scores for 4810 students from 87 unique exams taken across 3 yr of the introductory biology series at a large research university. We determined the median Bloom's level and the percentage of constructed-response questions for each exam. Despite controlling for prior academic ability in our models, we found that males and middle/high-SES students were disproportionately favored as the Bloom's level of exams increased. Additionally, middle/high-SES students were favored as the proportion of constructed-response questions on exams increased. Given that we controlled for prior academic ability, our findings do not likely reflect differences in academic ability level. We discuss possible explanations for our findings and how they might impact how we assess our students. © 2016 C. D. Wright, S. L. Eddy, et al. CBE—Life Sciences Education © 2016 The American Society for Cell Biology. This article is distributed by The American Society for Cell Biology under license from the author(s). It is available to the public under an Attribution–Noncommercial–Share Alike 3.0 Unported Creative Commons License (http://creativecommons.org/licenses/by-nc-sa/3.0).

  13. Building a Snow Data Management System using Open Source Software (and IDL)

    NASA Astrophysics Data System (ADS)

    Goodale, C. E.; Mattmann, C. A.; Ramirez, P.; Hart, A. F.; Painter, T.; Zimdars, P. A.; Bryant, A.; Brodzik, M.; Skiles, M.; Seidel, F. C.; Rittger, K. E.

    2012-12-01

    At NASA's Jet Propulsion Laboratory free and open source software is used everyday to support a wide range of projects, from planetary to climate to research and development. In this abstract I will discuss the key role that open source software has played in building a robust science data processing pipeline for snow hydrology research, and how the system is also able to leverage programs written in IDL, making JPL's Snow Data System a hybrid of open source and proprietary software. Main Points: - The Design of the Snow Data System (illustrate how the collection of sub-systems are combined to create a complete data processing pipeline) - Discuss the Challenges of moving from a single algorithm on a laptop, to running 100's of parallel algorithms on a cluster of servers (lesson's learned) - Code changes - Software license related challenges - Storage Requirements - System Evolution (from data archiving, to data processing, to data on a map, to near-real-time products and maps) - Road map for the next 6 months (including how easily we re-used the snowDS code base to support the Airborne Snow Observatory Mission) Software in Use and their Software Licenses: IDL - Used for pre and post processing of data. Licensed under a proprietary software license held by Excelis. Apache OODT - Used for data management and workflow processing. Licensed under the Apache License Version 2. GDAL - Geospatial Data processing library used for data re-projection currently. Licensed under the X/MIT license. GeoServer - WMS Server. Licensed under the General Public License Version 2.0 Leaflet.js - Javascript web mapping library. Licensed under the Berkeley Software Distribution License. Python - Glue code and miscellaneous data processing support. Licensed under the Python Software Foundation License. Perl - Script wrapper for running the SCAG algorithm. Licensed under the General Public License Version 3. PHP - Front-end web application programming. Licensed under the PHP License Version 3.01

  14. 76 FR 68514 - Request for a License To Export Reactor Components

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-04

    ... NUCLEAR REGULATORY COMMISSION Request for a License To Export Reactor Components Pursuant to 10.../docket Number Westinghouse Electric Company Complete reactor 12 Perform seismic China. LLC, August 18... qualification equipment. of AP1000 (design) nuclear reactors. For the Nuclear Regulatory Commission. Dated this...

  15. 31 CFR 598.405 - Transactions incidental to a licensed transaction.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... transaction. 598.405 Section 598.405 Money and Finance: Treasury Regulations Relating to Money and Finance... REGULATIONS Interpretations § 598.405 Transactions incidental to a licensed transaction. Any transaction... transactions by specially designated narcotics traffickers and debits to accounts blocked pursuant to § 598.202...

  16. 31 CFR 598.405 - Transactions incidental to a licensed transaction.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... transaction. 598.405 Section 598.405 Money and Finance: Treasury Regulations Relating to Money and Finance... REGULATIONS Interpretations § 598.405 Transactions incidental to a licensed transaction. Any transaction... transactions by specially designated narcotics traffickers and debits to accounts blocked pursuant to § 598.202...

  17. 31 CFR 598.405 - Transactions incidental to a licensed transaction.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... transaction. 598.405 Section 598.405 Money and Finance: Treasury Regulations Relating to Money and Finance... REGULATIONS Interpretations § 598.405 Transactions incidental to a licensed transaction. Any transaction... transactions by specially designated narcotics traffickers and debits to accounts blocked pursuant to § 598.202...

  18. 31 CFR 598.405 - Transactions incidental to a licensed transaction.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... transaction. 598.405 Section 598.405 Money and Finance: Treasury Regulations Relating to Money and Finance... REGULATIONS Interpretations § 598.405 Transactions incidental to a licensed transaction. Any transaction... transactions by specially designated narcotics traffickers and debits to accounts blocked pursuant to § 598.202...

  19. 31 CFR 598.405 - Transactions incidental to a licensed transaction.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... transaction. 598.405 Section 598.405 Money and Finance: Treasury Regulations Relating to Money and Finance... REGULATIONS Interpretations § 598.405 Transactions incidental to a licensed transaction. Any transaction... transactions by specially designated narcotics traffickers and debits to accounts blocked pursuant to § 598.202...

  20. Disclaimers

    Science.gov Websites

    Berkeley Lab Search Submit Web People Close About the Lab Leadership/Organization Calendar News Center different license is explicitly designated. Because of the nature of our contract, the US Government is granted for itself and others acting on its behalf a paid-up, nonexclusive, irrevocable worldwide license

  1. 14 CFR 1274.942 - Export licenses.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... appropriate licenses or other approvals, if required, for exports of hardware, technical data, and software... installation], where the foreign person will have access to export-controlled technical data or software. (c... software) pursuant to the exemption at 22 CFR 125.4(b)(3). The Agreement Officer or designated...

  2. 31 CFR 500.533 - Exportations, reexportations, and incidental transactions.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... CONTROL REGULATIONS Licenses, Authorizations and Statements of Licensing Policy § 500.533 Exportations..., software, or technology (including technical data) from the United States or reexportation of U.S.-origin goods, software, or technology from a foreign country to any person in a designated foreign country or...

  3. 10 CFR 170.3 - Definitions.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... license application. The standard design would be referenced in subsequent license applications. Research..., medical, or research activity; or (ii) Any material that— (A) Has been made radioactive by use of a... August 8, 2005, for use for a commercial, medical, or research activity; and (3) Any discrete source of...

  4. 10 CFR 170.3 - Definitions.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... license application. The standard design would be referenced in subsequent license applications. Research..., medical, or research activity; or (ii) Any material that— (A) Has been made radioactive by use of a... August 8, 2005, for use for a commercial, medical, or research activity; and (3) Any discrete source of...

  5. 10 CFR 170.3 - Definitions.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... license application. The standard design would be referenced in subsequent license applications. Research..., medical, or research activity; or (ii) Any material that— (A) Has been made radioactive by use of a... August 8, 2005, for use for a commercial, medical, or research activity; and (3) Any discrete source of...

  6. 10 CFR 170.3 - Definitions.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... license application. The standard design would be referenced in subsequent license applications. Research..., medical, or research activity; or (ii) Any material that— (A) Has been made radioactive by use of a... August 8, 2005, for use for a commercial, medical, or research activity; and (3) Any discrete source of...

  7. 10 CFR 170.3 - Definitions.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... license application. The standard design would be referenced in subsequent license applications. Research..., medical, or research activity; or (ii) Any material that— (A) Has been made radioactive by use of a... August 8, 2005, for use for a commercial, medical, or research activity; and (3) Any discrete source of...

  8. Teacher Knowledge for Active-Learning Instruction: Expert-Novice Comparison Reveals Differences.

    PubMed

    Auerbach, A J; Higgins, M; Brickman, P; Andrews, T C

    2018-01-01

    Active-learning strategies can improve science, technology, engineering, and mathematics (STEM) undergraduates' abilities to learn fundamental concepts and skills. However, the results instructors achieve vary substantially. One explanation for this is that instructors commonly implement active learning differently than intended. An important factor affecting how instructors implement active learning is knowledge of teaching and learning. We aimed to discover knowledge that is important to effective active learning in large undergraduate courses. We developed a lesson-analysis instrument to elicit teacher knowledge, drawing on the theoretical construct of teacher noticing. We compared the knowledge used by expert ( n = 14) and novice ( n = 29) active-learning instructors as they analyzed lessons. Experts and novices differed in what they noticed, with experts more commonly considering how instructors hold students accountable, topic-specific student difficulties, whether the instructor elicited and responded to student thinking, and opportunities students had to generate their own ideas and work. Experts were also better able to support their lesson analyses with reasoning. This work provides foundational knowledge for the future design of preparation and support for instructors adopting active learning. Improving teacher knowledge will improve the implementation of active learning, which will be necessary to widely realize the potential benefits of active learning in undergraduate STEM. © 2018 A. J. Auerbach et al. CBE—Life Sciences Education © 2018 The American Society for Cell Biology. This article is distributed by The American Society for Cell Biology under license from the author(s). It is available to the public under an Attribution–Noncommercial–Share Alike 3.0 Unported Creative Commons License (http://creativecommons.org/licenses/by-nc-sa/3.0).

  9. Teaching Real Data Interpretation with Models (TRIM): Analysis of Student Dialogue in a Large-Enrollment Cell and Developmental Biology Course.

    PubMed

    Zagallo, Patricia; Meddleton, Shanice; Bolger, Molly S

    2016-01-01

    We present our design for a cell biology course to integrate content with scientific practices, specifically data interpretation and model-based reasoning. A 2-yr research project within this course allowed us to understand how students interpret authentic biological data in this setting. Through analysis of written work, we measured the extent to which students' data interpretations were valid and/or generative. By analyzing small-group audio recordings during in-class activities, we demonstrated how students used instructor-provided models to build and refine data interpretations. Often, students used models to broaden the scope of data interpretations, tying conclusions to a biological significance. Coding analysis revealed several strategies and challenges that were common among students in this collaborative setting. Spontaneous argumentation was present in 82% of transcripts, suggesting that data interpretation using models may be a way to elicit this important disciplinary practice. Argumentation dialogue included frequent co-construction of claims backed by evidence from data. Other common strategies included collaborative decoding of data representations and noticing data patterns before making interpretive claims. Focusing on irrelevant data patterns was the most common challenge. Our findings provide evidence to support the feasibility of supporting students' data-interpretation skills within a large lecture course. © 2016 P. Zagallo et al. CBE—Life Sciences Education © 2016 The American Society for Cell Biology. This article is distributed by The American Society for Cell Biology under license from the author(s). It is available to the public under an Attribution–Noncommercial–Share Alike 3.0 Unported Creative Commons License (http://creativecommons.org/licenses/by-nc-sa/3.0).

  10. The reduction of intoxication and disorder in premises licensed to serve alcohol: An exploratory randomised controlled trial

    PubMed Central

    2010-01-01

    Background Licensed premises offer a valuable point of intervention to reduce alcohol-related harm. Objective To describe the research design for an exploratory trial examining the feasibility and acceptability of a premises-level intervention designed to reduce severe intoxication and related disorder. The study also aims to assess the feasibility of a potential future large scale effectiveness trial and provide information on key trial design parameters including inclusion criteria, premises recruitment methods, strategies to implement the intervention and trial design, outcome measures, data collection methods and intra-cluster correlations. Design A randomised controlled trial in licensed premises that had experienced at least one assault in the year preceding the intervention, documented in police or hospital Emergency Department (ED) records. Premises were recruited from four study areas by piloting four recruitment strategies of varying intensity. Thirty two licensed premises were grouped into matched pairs to reduce potential bias and randomly allocated to the control or intervention condition. The study included a nested process evaluation to provide information on intervention acceptability and implementation. Outcome measures included police-recorded violent incidents, assault-related attendances at each premises' local ED and patron Breath Alcohol Concentration assessed on exiting and entering study premises. Results The most successful recruitment method involved local police licensing officers and yielded a 100% success rate. Police-records of violence provided the most appropriate source of data about disorder at the premises level. Conclusion The methodology of an exploratory trial is presented and despite challenges presented by the study environment it is argued an exploratory trial is warranted. Initial investigations in recruitment methods suggest that study premises should be recruited with the assistance of police officers. Police data were of sufficient quality to identify disorder and street surveys are a feasible method for measuring intoxication at the individual level. Trial registration UKCRN 7090; ISRCTN: 80875696 Funding Medical Research Council (G0701758) to Simon Moore, Simon Murphy, Laurence Moore and Jonathan Shepherd PMID:20946634

  11. 10 CFR 52.163 - Administrative review of applications; hearings.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... constructing and/or operating the manufactured reactor or an evaluation of alternative energy sources. All... 10 Energy 2 2013-01-01 2013-01-01 false Administrative review of applications; hearings. 52.163 Section 52.163 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSES, CERTIFICATIONS, AND APPROVALS...

  12. 10 CFR 52.163 - Administrative review of applications; hearings.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... constructing and/or operating the manufactured reactor or an evaluation of alternative energy sources. All... 10 Energy 2 2011-01-01 2011-01-01 false Administrative review of applications; hearings. 52.163 Section 52.163 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSES, CERTIFICATIONS, AND APPROVALS...

  13. 10 CFR 52.163 - Administrative review of applications; hearings.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... constructing and/or operating the manufactured reactor or an evaluation of alternative energy sources. All... 10 Energy 2 2012-01-01 2012-01-01 false Administrative review of applications; hearings. 52.163 Section 52.163 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSES, CERTIFICATIONS, AND APPROVALS...

  14. 10 CFR 52.163 - Administrative review of applications; hearings.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... constructing and/or operating the manufactured reactor or an evaluation of alternative energy sources. All... 10 Energy 2 2014-01-01 2014-01-01 false Administrative review of applications; hearings. 52.163 Section 52.163 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSES, CERTIFICATIONS, AND APPROVALS...

  15. 10 CFR 52.163 - Administrative review of applications; hearings.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... constructing and/or operating the manufactured reactor or an evaluation of alternative energy sources. All... 10 Energy 2 2010-01-01 2010-01-01 false Administrative review of applications; hearings. 52.163 Section 52.163 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSES, CERTIFICATIONS, AND APPROVALS...

  16. 33 CFR 114.05 - Definitions.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    .... (h) Permit. The term “permit” means the license permitting construction of bridges and approaches... subchapter. (i) Secretary. The term “Secretary” means the Secretary of Homeland Security or any person to... term “bridge” means a structure erected across navigable waters of the United States, and includes...

  17. 75 FR 9444 - Agency Information Collection Activities: Proposed Collection; Comment Request

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-02

    ... applications for licenses and amendments thereto to construct and operate nuclear power plants, preliminary or... NUCLEAR REGULATORY COMMISSION [Docket No. NRC-2010-0063] Agency Information Collection Activities: Proposed Collection; Comment Request AGENCY: U.S. Nuclear Regulatory Commission (NRC). ACTION: Notice of...

  18. 47 CFR 90.713 - Entry criteria.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ..., commercial use to non-Government, Phase I applicants. Applicants for these nationwide channel blocks must... four years of the license term; i.e., that the applicant has net current assets sufficient to cover... application showing net current assets sufficient to meet estimated construction and operating costs. An...

  19. 10 CFR 60.17 - Contents of site characterization plan.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... GEOLOGIC REPOSITORIES Licenses Preapplication Review § 60.17 Contents of site characterization plan. The... construction authorization for a geologic repository operations area; (4) Criteria, developed pursuant to... area for the location of a geologic repository; and (5) Any other information which the Commission, by...

  20. A Real-Time All-Atom Structural Search Engine for Proteins

    PubMed Central

    Gonzalez, Gabriel; Hannigan, Brett; DeGrado, William F.

    2014-01-01

    Protein designers use a wide variety of software tools for de novo design, yet their repertoire still lacks a fast and interactive all-atom search engine. To solve this, we have built the Suns program: a real-time, atomic search engine integrated into the PyMOL molecular visualization system. Users build atomic-level structural search queries within PyMOL and receive a stream of search results aligned to their query within a few seconds. This instant feedback cycle enables a new “designability”-inspired approach to protein design where the designer searches for and interactively incorporates native-like fragments from proven protein structures. We demonstrate the use of Suns to interactively build protein motifs, tertiary interactions, and to identify scaffolds compatible with hot-spot residues. The official web site and installer are located at http://www.degradolab.org/suns/ and the source code is hosted at https://github.com/godotgildor/Suns (PyMOL plugin, BSD license), https://github.com/Gabriel439/suns-cmd (command line client, BSD license), and https://github.com/Gabriel439/suns-search (search engine server, GPLv2 license). PMID:25079944

  1. 76 FR 20800 - Bureau of Political-Military Affairs: Directorate of Defense Trade Controls; Notifications to the...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-13

    ..., certification of a proposed manufacturing license agreement for the manufacture of significant military..., certification of a proposed manufacturing license agreement for the manufacture of significant military... transfer of defense articles, to include technical data, and defense services to support the design...

  2. 78 FR 57904 - Request for a License To Export; Reactor Components

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-20

    ... NUCLEAR REGULATORY COMMISSION Request for a License To Export; Reactor Components Pursuant to 10..., systems, related reactors. operation of AP- XR177, 11006121. equipment, and 1000 (design) spare parts. nuclear reactors. Dated this 16th day of September 2013 in Rockville, Maryland. For The Nuclear Regulatory...

  3. 10 CFR 2.1004 - Amendments and additions.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... for the Issuance of Licenses for the Receipt of High-Level Radioactive Waste at a Geologic Repository... electronic form must be identified in an electronic notice and made available for inspection and copying by... Pre-License Application Presiding Officer or the Presiding Officer designated for the high-level waste...

  4. 10 CFR 2.1004 - Amendments and additions.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... for the Issuance of Licenses for the Receipt of High-Level Radioactive Waste at a Geologic Repository... electronic form must be identified in an electronic notice and made available for inspection and copying by... Pre-License Application Presiding Officer or the Presiding Officer designated for the high-level waste...

  5. 38 CFR 21.5230 - Programs of education.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ...) Except for a program consisting of a licensing or certification test designed to help the veteran or...) VOCATIONAL REHABILITATION AND EDUCATION Post-Vietnam Era Veterans' Educational Assistance Under 38 U.S.C... licensing or certification test, the program has an objective as described in § 21.5021(r) or (s); (3) Any...

  6. 38 CFR 21.5230 - Programs of education.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ...) Except for a program consisting of a licensing or certification test designed to help the veteran or...) VOCATIONAL REHABILITATION AND EDUCATION Post-Vietnam Era Veterans' Educational Assistance Under 38 U.S.C... licensing or certification test, the program has an objective as described in § 21.5021(r) or (s); (3) Any...

  7. 38 CFR 21.5230 - Programs of education.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ...) Except for a program consisting of a licensing or certification test designed to help the veteran or...) VOCATIONAL REHABILITATION AND EDUCATION Post-Vietnam Era Veterans' Educational Assistance Under 38 U.S.C... licensing or certification test, the program has an objective as described in § 21.5021(r) or (s); (3) Any...

  8. 38 CFR 21.5230 - Programs of education.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ...) Except for a program consisting of a licensing or certification test designed to help the veteran or...) VOCATIONAL REHABILITATION AND EDUCATION Post-Vietnam Era Veterans' Educational Assistance Under 38 U.S.C... licensing or certification test, the program has an objective as described in § 21.5021(r) or (s); (3) Any...

  9. 38 CFR 21.5230 - Programs of education.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ...) Except for a program consisting of a licensing or certification test designed to help the veteran or...) VOCATIONAL REHABILITATION AND EDUCATION Post-Vietnam Era Veterans' Educational Assistance Under 38 U.S.C... licensing or certification test, the program has an objective as described in § 21.5021(r) or (s); (3) Any...

  10. 37 CFR 270.5 - Designated collection and distribution organizations for records of use of sound recordings under...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ..., Statements of Account, Auditor's Reports, and other verification information filed in the Copyright Office... statements of account under compulsory license for making/distributing phonorecords of 201.19 Nondramatic... works, Royalties and statements of account under compulsory license for making/distributing 201.19...

  11. 32 CFR 766.8 - Procedure for review, approval, execution and distribution of aviation facility licenses.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... CIVIL AIRCRAFT § 766.8 Procedure for review, approval, execution and distribution of aviation facility... license and Certificate of Insurance to the Commander, Naval Facilities Engineering Command or his... Facilities Engineering Command or his designated representative. (1) Upon receipt, the Commander, Naval...

  12. 10 CFR 2.104 - Notice of hearing.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 1 2011-01-01 2011-01-01 false Notice of hearing. 2.104 Section 2.104 Energy NUCLEAR REGULATORY COMMISSION RULES OF PRACTICE FOR DOMESTIC LICENSING PROCEEDINGS AND ISSUANCE OF ORDERS Procedure for Issuance, Amendment, Transfer, or Renewal of a License, and Standard Design Approval Hearing on...

  13. 10 CFR 2.104 - Notice of hearing.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 1 2010-01-01 2010-01-01 false Notice of hearing. 2.104 Section 2.104 Energy NUCLEAR REGULATORY COMMISSION RULES OF PRACTICE FOR DOMESTIC LICENSING PROCEEDINGS AND ISSUANCE OF ORDERS Procedure for Issuance, Amendment, Transfer, or Renewal of a License, and Standard Design Approval Hearing on...

  14. 48 CFR 1852.225-70 - Export Licenses.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... licenses or other approvals, if required, for exports of hardware, technical data, and software, or for the... will have access to export-controlled technical data or software. (c) The Contractor shall be... software) pursuant to the exemption at 22 CFR 125.4(b)(3). The Contracting Officer or designated...

  15. 10 CFR 2.1010 - Pre-License Application Presiding Officer.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... application phase, including disputes relating to privilege, and disputes relating to the implementation of... Application Presiding Officer shall be designated at such time during the pre-license application phase as the... claim of document withholding to determine— (1) Whether it is documentary material within the scope of...

  16. 10 CFR 2.1010 - Pre-License Application Presiding Officer.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... application phase, including disputes relating to privilege, and disputes relating to the implementation of... Application Presiding Officer shall be designated at such time during the pre-license application phase as the... claim of document withholding to determine— (1) Whether it is documentary material within the scope of...

  17. 75 FR 4111 - Biweekly Notice; Applications and Amendments to Facility Operating Licenses Involving No...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-26

    ... addition, the requestor/petitioner shall provide a brief explanation of the bases for the contention and a..., malfunctions, or accident initiators not considered in the design and licensing bases. The proposed amendment... technical specifications (TSs) requirements related to primary containment isolation instrumentation in...

  18. 78 FR 25310 - Biweekly Notice; Applications and Amendments to Facility Operating Licenses and Combined Licenses...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-30

    .../diminished. There are no design changes associated with this TS amendment. The DC power system/batteries will... changes restructure the Technical Specifications (TS) for the direct current (DC) electrical power system... battery and battery charger operability requirements. The DC electrical power system, including associated...

  19. 9 CFR 114.7 - Personnel at licensed establishments.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... REQUIREMENTS FOR BIOLOGICAL PRODUCTS § 114.7 Personnel at licensed establishments. (a) Each licensee shall... matters pertaining to the preparation of biological products under the Virus-Serum-Toxin Act. The licensee... designated person and for each person responsible for any phase of preparation of a biological product. (b...

  20. 9 CFR 114.7 - Personnel at licensed establishments.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... REQUIREMENTS FOR BIOLOGICAL PRODUCTS § 114.7 Personnel at licensed establishments. (a) Each licensee shall... matters pertaining to the preparation of biological products under the Virus-Serum-Toxin Act. The licensee... designated person and for each person responsible for any phase of preparation of a biological product. (b...

Top