Code of Federal Regulations, 2010 CFR
2010-01-01
... Construct and Licenses To Operate Nuclear Power Reactors of Identical Design at Multiple Sites N Appendix N... FACILITIES Pt. 50, App.N Appendix N to Part 50—Standardization of Nuclear Power Plant Designs: Permits To..., apply to construction permits and operating licenses subject to this appendix N. 2. Applications for...
Code of Federal Regulations, 2014 CFR
2014-01-01
... 10 Energy 1 2014-01-01 2014-01-01 false Standardization of Nuclear Power Plant Designs: Permits To Construct and Licenses To Operate Nuclear Power Reactors of Identical Design at Multiple Sites N Appendix N to Part 50 Energy NUCLEAR REGULATORY COMMISSION DOMESTIC LICENSING OF PRODUCTION AND UTILIZATION FACILITIES Pt. 50, App. N Appendix N to Par...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-12-04
...: Control Number: 3060-0031. Title: Application for Consent to Assignment of Broadcast Station Construction... Station Construction Permit or License, FCC Form 315; Section 73.3580, Local Public Notice of Filing of... construction permits designed primarily to serve Tribal Lands (the ``Tribal Priority''). Tribal affiliated...
36 CFR 223.38 - Standards for road design and construction.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 36 Parks, Forests, and Public Property 2 2011-07-01 2011-07-01 false Standards for road design and... PRODUCTS Timber Sale Contracts Contract Conditions and Provisions § 223.38 Standards for road design and construction. Road construction authorized under timber sale contracts, permits and other documents authorizing...
Code of Federal Regulations, 2011 CFR
2011-01-01
... Construct and Licenses To Operate Nuclear Power Reactors of Identical Design at Multiple Sites N Appendix N... Construct and Licenses To Operate Nuclear Power Reactors of Identical Design at Multiple Sites Section 101... nuclear power reactors of essentially the same design to be located at different sites. 1 1 If the design...
Code of Federal Regulations, 2012 CFR
2012-01-01
... Construct and Licenses To Operate Nuclear Power Reactors of Identical Design at Multiple Sites N Appendix N... Construct and Licenses To Operate Nuclear Power Reactors of Identical Design at Multiple Sites Section 101... nuclear power reactors of essentially the same design to be located at different sites. 1 1 If the design...
Code of Federal Regulations, 2013 CFR
2013-01-01
... Construct and Licenses To Operate Nuclear Power Reactors of Identical Design at Multiple Sites N Appendix N... Construct and Licenses To Operate Nuclear Power Reactors of Identical Design at Multiple Sites Section 101... nuclear power reactors of essentially the same design to be located at different sites. 1 1 If the design...
Code of Federal Regulations, 2010 CFR
2010-01-01
... construction or manufacture, or any defect found in the final design of a facility as approved and released for..., combined licenses, and manufacturing licenses. 50.55 Section 50.55 Energy NUCLEAR REGULATORY COMMISSION DOMESTIC LICENSING OF PRODUCTION AND UTILIZATION FACILITIES Issuance, Limitations, and Conditions of...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-10-31
...: Whenever applications are made for early site permits (ESPs), standard design certifications (SDCs). 6. Who... standard NPP designs, and licenses which combine in a single license a construction permit, and an... information collected to assess the adequacy and suitability of an applicant's site, plant design...
10 CFR 50.37 - Agreement limiting access to Classified Information.
Code of Federal Regulations, 2010 CFR
2010-01-01
... Section 50.37 Energy NUCLEAR REGULATORY COMMISSION DOMESTIC LICENSING OF PRODUCTION AND UTILIZATION... or the issuance of a license, construction permit, early site permit, or standard design approval, or before the Commission has adopted a final standard design certification rule under part 52 of this...
Inspection of Construction Works According to Polish Construction Law
NASA Astrophysics Data System (ADS)
Czemplik, A.
2015-11-01
Construction regulations are still different in many European countries, even though the European Union directives have unified many acts for construction works and construction products in the member countries. The scheme of the construction process presented in the paper could be valid for most countries, despite of detailed regulations of legal systems. The number of construction regulations to be followed in order to get the Construction Permit in Poland is rather big, so the time between the start of the investment process and the day when the Construction Permit is issued could be several months. Only licensed professional engineers can play the role of site managers, site inspectors and designers, registered for the given construction project. Duties and responsibilities (civil liability) of these engineers are strictly defined by regulations. The obligatory inspection of construction works should be executed by the licensed site inspectors. Moreover, the works can be incidentally inspected by Authority, banks, insurance companies or designers. Foreign designers and foreign site engineers in order to be allowed by respective Authority to play official roles on Polish construction sites should present documents proving that they can do the same jobs in their countries as per regulations obligatory there.
Environmental Assessment for the Solar Photovoltaic Array at Eglin Air Force Base, Florida
2014-01-24
design changes. The Proposed Action also includes construction of the solar PV system , construction of a perimeter fence, and routine site maintenance...Department of Environmental Protection (FDEP) National Pollutant Discharge Elimination System (NPDES) Permit ● Environmental Resource Permit...Management Actions Soils ● Describe slopes, drainage patterns, areas of soil disturbance, areas where stabilization practices will occur, water
40 CFR 258.4 - Research, development, and demonstration permits.
Code of Federal Regulations, 2012 CFR
2012-07-01
... leachate collection system designed and constructed to maintain less than a 30-cm depth of leachate on the..., or cause leachate depth on the liner to exceed 30-cm. (c) Any permit issued under this section must...
40 CFR 258.4 - Research, development, and demonstration permits.
Code of Federal Regulations, 2013 CFR
2013-07-01
... leachate collection system designed and constructed to maintain less than a 30-cm depth of leachate on the..., or cause leachate depth on the liner to exceed 30-cm. (c) Any permit issued under this section must...
40 CFR 258.4 - Research, development, and demonstration permits.
Code of Federal Regulations, 2014 CFR
2014-07-01
... leachate collection system designed and constructed to maintain less than a 30-cm depth of leachate on the..., or cause leachate depth on the liner to exceed 30-cm. (c) Any permit issued under this section must...
Lift-Shape Construction, An EFL Project Report.
ERIC Educational Resources Information Center
Evans, Ben H.
Research development of a construction system is detailed in terms of--(1) design and analysis, (2) construction methods, (3) testing, (4) cost analysis, and (5) architectural potentials. The system described permits construction of usual shapes without the use of conventional concrete formwork. The concrete involves development of a structural…
Federal Register 2010, 2011, 2012, 2013, 2014
2011-12-29
... Construction Permits; Revised Construction Permit Number in Auction 93 AGENCY: Federal Communications Commission. ACTION: Notice. SUMMARY: This document announces a change to the construction permit number for one of the FM broadcast construction permits for Auction 93. FOR FURTHER INFORMATION CONTACT: Linda...
Conceptual design of a mobile remote manipulator system
NASA Technical Reports Server (NTRS)
Bush, H. G.; Mikulas, M. M., Jr.; Wallsom, R. E.; Jensen, J. K.
1984-01-01
A mobile remote manipulator system has been identified as a necessary device for space station. A conceptual design for an MRMS is presented which features (1) tracks on the MRMS and guide pins only on the truss structure, (2) a push/pull drive mechanism which rotates to permit movement in four directions, and (3) spacecrane and mobile foot restraint manipulators (or arms). Operational and design features of the MRMS elements are described and illustrated. Concepts are also presented which permit rotating the operational plane of the MRMS through 90 deg. Such a system has been found to have great utility for initial space station construction, maintenance and repair, and to provide a construction capability for future station growth or large spacecraft assembly and/or servicing.
30 CFR 36.23 - Engine intake system.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 30 Mineral Resources 1 2014-07-01 2014-07-01 false Engine intake system. 36.23 Section 36.23... EQUIPMENT Construction and Design Requirements § 36.23 Engine intake system. (a) Construction. The intake... operator's compartment, to shut off the air supply to the engine. This valve shall be constructed to permit...
30 CFR 36.23 - Engine intake system.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 30 Mineral Resources 1 2012-07-01 2012-07-01 false Engine intake system. 36.23 Section 36.23... EQUIPMENT Construction and Design Requirements § 36.23 Engine intake system. (a) Construction. The intake... operator's compartment, to shut off the air supply to the engine. This valve shall be constructed to permit...
Video display engineering and optimization system
NASA Technical Reports Server (NTRS)
Larimer, James (Inventor)
1997-01-01
A video display engineering and optimization CAD simulation system for designing a LCD display integrates models of a display device circuit, electro-optics, surface geometry, and physiological optics to model the system performance of a display. This CAD system permits system performance and design trade-offs to be evaluated without constructing a physical prototype of the device. The systems includes a series of modules which permit analysis of design trade-offs in terms of their visual impact on a viewer looking at a display.
40 CFR 270.62 - Hazardous waste incinerator permits.
Code of Federal Regulations, 2012 CFR
2012-07-01
..., at the request of the applicant when good cause is shown. The permit may be modified to reflect the...) Stack gas monitoring and pollution control equipment. (H) Nozzle and burner design. (I) Construction... imminent hazard to human health or the environment; (iii) The trial burn will help the Director to...
40 CFR 270.62 - Hazardous waste incinerator permits.
Code of Federal Regulations, 2014 CFR
2014-07-01
..., at the request of the applicant when good cause is shown. The permit may be modified to reflect the...) Stack gas monitoring and pollution control equipment. (H) Nozzle and burner design. (I) Construction... imminent hazard to human health or the environment; (iii) The trial burn will help the Director to...
40 CFR 270.62 - Hazardous waste incinerator permits.
Code of Federal Regulations, 2011 CFR
2011-07-01
..., at the request of the applicant when good cause is shown. The permit may be modified to reflect the...) Stack gas monitoring and pollution control equipment. (H) Nozzle and burner design. (I) Construction... imminent hazard to human health or the environment; (iii) The trial burn will help the Director to...
40 CFR 270.62 - Hazardous waste incinerator permits.
Code of Federal Regulations, 2013 CFR
2013-07-01
..., at the request of the applicant when good cause is shown. The permit may be modified to reflect the...) Stack gas monitoring and pollution control equipment. (H) Nozzle and burner design. (I) Construction... imminent hazard to human health or the environment; (iii) The trial burn will help the Director to...
10 CFR 50.23 - Construction permits.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 10 Energy 1 2012-01-01 2012-01-01 false Construction permits. 50.23 Section 50.23 Energy NUCLEAR... Description of Licenses § 50.23 Construction permits. A construction permit for the construction of a... part 52 of this chapter, the construction permit and operating license are deemed to be combined in a...
10 CFR 50.23 - Construction permits.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 10 Energy 1 2014-01-01 2014-01-01 false Construction permits. 50.23 Section 50.23 Energy NUCLEAR... Description of Licenses § 50.23 Construction permits. A construction permit for the construction of a... part 52 of this chapter, the construction permit and operating license are deemed to be combined in a...
10 CFR 50.23 - Construction permits.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 10 Energy 1 2013-01-01 2013-01-01 false Construction permits. 50.23 Section 50.23 Energy NUCLEAR... Description of Licenses § 50.23 Construction permits. A construction permit for the construction of a... part 52 of this chapter, the construction permit and operating license are deemed to be combined in a...
10 CFR 50.23 - Construction permits.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 10 Energy 1 2010-01-01 2010-01-01 false Construction permits. 50.23 Section 50.23 Energy NUCLEAR... Description of Licenses § 50.23 Construction permits. A construction permit for the construction of a... part 52 of this chapter, the construction permit and operating license are deemed to be combined in a...
Code of Federal Regulations, 2011 CFR
2011-01-01
... 10 Energy 1 2011-01-01 2011-01-01 false Conditions of construction permits, early site permits... Licenses and Construction Permits § 50.55 Conditions of construction permits, early site permits, combined... conditions; each early site permit is subject to the terms and conditions in paragraph (f) of this section...
FutureGen 2.0 Pipeline and Regional Carbon Capture Storage Project - Final Report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Burger, Chris; Wortman, David; Brown, Chris
The U.S. Department of Energy’s (DOE) FutureGen 2.0 Program involves two projects: (1) the Oxy-Combustion Power Plant Project and (2) the CO2 Pipeline and Storage Project. This Final Technical Report is focused on the CO2 Pipeline and Storage Project. The FutureGen 2.0 CO2 Pipeline and Storage Project evolved from an initial siting and project definition effort in Phase I, into the Phase II activity consisting permitting, design development, the acquisition of land rights, facility design, and licensing and regulatory approvals. Phase II also progressed into construction packaging, construction procurement, and targeted early preparatory activities in the field. The CO2 Pipelinemore » and Storage Project accomplishments were significant, and in some cases unprecedented. The engineering, permitting, legal, stakeholder, and commercial learnings substantially advance the nation’s understanding of commercial-scale CO2 storage in deep saline aquifers. Voluminous and significant information was obtained from the drilling and the testing program of the subsurface, and sophisticated modeling was performed that held up to a wide range of scrutiny. All designs progressed to the point of securing construction contracts or comfort letters attesting to successful negotiation of all contract terms and willing execution at the appropriate time all major project elements – pipeline, surface facilities, and subsurface – as well as operations. While the physical installation of the planned facilities did not proceed in part due to insufficient time to complete the project prior to the expiration of federal funding, the project met significant objectives prior to DOE’s closeout decision. Had additional time been available, there were no known, insurmountable obstacles that would have precluded successful construction and operation of the project. Due to the suspension of the project, site restoration activities were developed and the work was accomplished. The site restoration efforts are also documented in this report. All permit applications had been submitted to all agencies for those permits or approvals required prior to the start of project construction. Most of the requisite permits were received during Phase II. This report includes information on each permitting effort. Successes and lessons learned are included in this report that will add value to the next generation of carbon storage efforts.« less
Battery cell feedthrough apparatus
Kaun, Thomas D.
1995-01-01
A compact, hermetic feedthrough apparatus comprising interfitting sleeve portions constructed of chemically-stable materials to permit unique battery designs and increase battery life and performance.
Federal Register 2010, 2011, 2012, 2013, 2014
2013-05-09
... simulations. Final channel design and associated environmental impacts will be addressed during the permitting and EIS process. The EIS will evaluate the effects of construction and long term effects of the... in the EIS process; announce the plans for an additional public scoping meeting; solicit public...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Eberle, Annika; Bhatt, Arpit; Zhang, Yimin
Advanced biofuel production facilities (biorefineries), such as those envisioned by the United States (U.S.) Renewable Fuel Standard and U.S. Department of Energy's research and development programs, often lack historical air pollutant emissions data, which can pose challenges for obtaining air emission permits that are required for construction and operation. To help fill this knowledge gap, we perform a thorough regulatory analysis and use engineering process designs to assess the applicability of federal air regulations and quantify air pollutant emissions for two feasibility-level biorefinery designs. We find that without additional emission-control technologies both biorefineries would likely be required to obtain majormore » source permits under the Clean Air Act's New Source Review program. The permitting classification (so-called 'major' or 'minor') has implications for the time and effort required for permitting and therefore affects the cost of capital and the fuel selling price. Consequently, we explore additional technically feasible emission-control technologies and process modifications that have the potential to reduce emissions to achieve a minor source permitting classification. Finally, our analysis of air pollutant emissions and controls can assist biorefinery developers with the air permitting process and inform regulatory agencies about potential permitting pathways for novel biorefinery designs.« less
Eberle, Annika; Bhatt, Arpit; Zhang, Yimin; ...
2017-04-26
Advanced biofuel production facilities (biorefineries), such as those envisioned by the United States (U.S.) Renewable Fuel Standard and U.S. Department of Energy's research and development programs, often lack historical air pollutant emissions data, which can pose challenges for obtaining air emission permits that are required for construction and operation. To help fill this knowledge gap, we perform a thorough regulatory analysis and use engineering process designs to assess the applicability of federal air regulations and quantify air pollutant emissions for two feasibility-level biorefinery designs. We find that without additional emission-control technologies both biorefineries would likely be required to obtain majormore » source permits under the Clean Air Act's New Source Review program. The permitting classification (so-called 'major' or 'minor') has implications for the time and effort required for permitting and therefore affects the cost of capital and the fuel selling price. Consequently, we explore additional technically feasible emission-control technologies and process modifications that have the potential to reduce emissions to achieve a minor source permitting classification. Finally, our analysis of air pollutant emissions and controls can assist biorefinery developers with the air permitting process and inform regulatory agencies about potential permitting pathways for novel biorefinery designs.« less
Eberle, Annika; Bhatt, Arpit; Zhang, Yimin; Heath, Garvin
2017-06-06
Advanced biofuel production facilities (biorefineries), such as those envisioned by the United States (U.S.) Renewable Fuel Standard and U.S. Department of Energy's research and development programs, often lack historical air pollutant emissions data, which can pose challenges for obtaining air emission permits that are required for construction and operation. To help fill this knowledge gap, we perform a thorough regulatory analysis and use engineering process designs to assess the applicability of federal air regulations and quantify air pollutant emissions for two feasibility-level biorefinery designs. We find that without additional emission-control technologies both biorefineries would likely be required to obtain major source permits under the Clean Air Act's New Source Review program. The permitting classification (so-called "major" or "minor") has implications for the time and effort required for permitting and therefore affects the cost of capital and the fuel selling price. Consequently, we explore additional technically feasible emission-control technologies and process modifications that have the potential to reduce emissions to achieve a minor source permitting classification. Our analysis of air pollutant emissions and controls can assist biorefinery developers with the air permitting process and inform regulatory agencies about potential permitting pathways for novel biorefinery designs.
10 CFR 52.137 - Contents of applications; technical information.
Code of Federal Regulations, 2012 CFR
2012-01-01
... FOR NUCLEAR POWER PLANTS Standard Design Approvals § 52.137 Contents of applications; technical... power plants similar in design and location to plants for which construction permits have previously... light-water-cooled nuclear power plants, an evaluation of the standard plant design against the Standard...
10 CFR 52.137 - Contents of applications; technical information.
Code of Federal Regulations, 2011 CFR
2011-01-01
... FOR NUCLEAR POWER PLANTS Standard Design Approvals § 52.137 Contents of applications; technical... power plants similar in design and location to plants for which construction permits have previously... light-water-cooled nuclear power plants, an evaluation of the standard plant design against the Standard...
10 CFR 52.137 - Contents of applications; technical information.
Code of Federal Regulations, 2014 CFR
2014-01-01
... FOR NUCLEAR POWER PLANTS Standard Design Approvals § 52.137 Contents of applications; technical... power plants similar in design and location to plants for which construction permits have previously... light-water-cooled nuclear power plants, an evaluation of the standard plant design against the Standard...
10 CFR 52.137 - Contents of applications; technical information.
Code of Federal Regulations, 2013 CFR
2013-01-01
... FOR NUCLEAR POWER PLANTS Standard Design Approvals § 52.137 Contents of applications; technical... power plants similar in design and location to plants for which construction permits have previously... light-water-cooled nuclear power plants, an evaluation of the standard plant design against the Standard...
10 CFR 52.171 - Finality of manufacturing licenses; information requests.
Code of Federal Regulations, 2010 CFR
2010-01-01
... required for issuance of a construction permit, operating license, combined license, in any hearing under... manufactured reactor, the costs and benefits of severe accident mitigation design alternatives, and the bases for not incorporating severe accident mitigation design alternatives into the design of the reactor to...
10 CFR 2.104 - Notice of hearing.
Code of Federal Regulations, 2012 CFR
2012-01-01
... work authorization, construction permit, early site permit, or combined license for a facility of the... work authorization, construction permit, early site permit, or combined license for a facility of the... hearing concerning an application for a limited work authorization, construction permit, early site permit...
Battery cell feedthrough apparatus
Kaun, T.D.
1995-03-14
A compact, hermetic feedthrough apparatus is described comprising interfitting sleeve portions constructed of chemically-stable materials to permit unique battery designs and increase battery life and performance. 8 figs.
A Guide for Marina and Harbor Managers
1991-03-01
the natural ecology of an area, and harm wildlife habitat and breeding areas. Permit authority and environmental protection agencies are designed to...designed to serve boats of various sizes. They are usually constructed of wood or metal docks that are either mounted on piers, anchored, or of the...find information on berthing facilities for possible construction. He would be referred to the laws section and the regulation that governs contruction
10 CFR 50.90 - Application for amendment of license, construction permit, or early site permit.
Code of Federal Regulations, 2010 CFR
2010-01-01
..., or early site permit. 50.90 Section 50.90 Energy NUCLEAR REGULATORY COMMISSION DOMESTIC LICENSING OF....90 Application for amendment of license, construction permit, or early site permit. Whenever a holder of a license, including a construction permit and operating license under this part, and an early...
10 CFR 50.90 - Application for amendment of license, construction permit, or early site permit.
Code of Federal Regulations, 2011 CFR
2011-01-01
..., or early site permit. 50.90 Section 50.90 Energy NUCLEAR REGULATORY COMMISSION DOMESTIC LICENSING OF....90 Application for amendment of license, construction permit, or early site permit. Whenever a holder of a license, including a construction permit and operating license under this part, and an early...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-09-06
...] Approval and Promulgation of Air Quality Implementation Plans; Colorado; Construction Permit Program Fee Increases; Construction Permit Regulation of PM 2.5 ; Regulation 3 AGENCY: Environmental Protection Agency... construction permit processing fees. EPA proposes approval of Colorado's May 25, 2011 submittal, which...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-12-23
...) General Permit for Discharges from Construction Activities (2012 Construction General Permit). The EA... runoff from construction activities greater than one acre, where EPA is the permitting authority. Based... significant environmental impacts are anticipated from the issuance of the 2012 Construction General Permit...
40 CFR 125.98 - As the Director, what must I do to comply with the requirements of this subpart?
Code of Federal Regulations, 2011 CFR
2011-07-01
... technologies, operational measures, or restoration measures should be included in the permit to meet the... evaluate the performance of the design and construction technologies, operational measures, and/or... construction technologies, operational measure, and/or restoration measures, and/or improved operation and...
On the next generation of reliability analysis tools
NASA Technical Reports Server (NTRS)
Babcock, Philip S., IV; Leong, Frank; Gai, Eli
1987-01-01
The current generation of reliability analysis tools concentrates on improving the efficiency of the description and solution of the fault-handling processes and providing a solution algorithm for the full system model. The tools have improved user efficiency in these areas to the extent that the problem of constructing the fault-occurrence model is now the major analysis bottleneck. For the next generation of reliability tools, it is proposed that techniques be developed to improve the efficiency of the fault-occurrence model generation and input. Further, the goal is to provide an environment permitting a user to provide a top-down design description of the system from which a Markov reliability model is automatically constructed. Thus, the user is relieved of the tedious and error-prone process of model construction, permitting an efficient exploration of the design space, and an independent validation of the system's operation is obtained. An additional benefit of automating the model construction process is the opportunity to reduce the specialized knowledge required. Hence, the user need only be an expert in the system he is analyzing; the expertise in reliability analysis techniques is supplied.
40 CFR 165.25 - Nonrefillable container standards.
Code of Federal Regulations, 2013 CFR
2013-07-01
... PROGRAMS PESTICIDE MANAGEMENT AND DISPOSAL Nonrefillable Container Standards: Container Design and Residue... 171.8 must be packaged in a nonrefillable container that, if portable, is designed, constructed, and... are applicable to a Packing Group III material, or, if subject to a special permit, according to the...
40 CFR 165.25 - Nonrefillable container standards.
Code of Federal Regulations, 2014 CFR
2014-07-01
... PROGRAMS PESTICIDE MANAGEMENT AND DISPOSAL Nonrefillable Container Standards: Container Design and Residue... 171.8 must be packaged in a nonrefillable container that, if portable, is designed, constructed, and... are applicable to a Packing Group III material, or, if subject to a special permit, according to the...
40 CFR 165.25 - Nonrefillable container standards.
Code of Federal Regulations, 2012 CFR
2012-07-01
... PROGRAMS PESTICIDE MANAGEMENT AND DISPOSAL Nonrefillable Container Standards: Container Design and Residue... 171.8 must be packaged in a nonrefillable container that, if portable, is designed, constructed, and... are applicable to a Packing Group III material, or, if subject to a special permit, according to the...
40 CFR 165.25 - Nonrefillable container standards.
Code of Federal Regulations, 2011 CFR
2011-07-01
... PROGRAMS PESTICIDE MANAGEMENT AND DISPOSAL Nonrefillable Container Standards: Container Design and Residue... 171.8 must be packaged in a nonrefillable container that, if portable, is designed, constructed, and... are applicable to a Packing Group III material, or, if subject to a special permit, according to the...
40 CFR 165.25 - Nonrefillable container standards.
Code of Federal Regulations, 2010 CFR
2010-07-01
... PROGRAMS PESTICIDE MANAGEMENT AND DISPOSAL Nonrefillable Container Standards: Container Design and Residue... 171.8 must be packaged in a nonrefillable container that, if portable, is designed, constructed, and... are applicable to a Packing Group III material, or, if subject to a special permit, according to the...
Barrier Free Design Handbook: Accommodations for the Physically Handicapped.
ERIC Educational Resources Information Center
Veterans Administration, Washington, DC. Office of Construction.
The handbook sets forth design requirements for construction and renovation of buildings owned, leased, or funded by the Veterans Administration (VA), to permit physically handicapped persons ready access. The book is intended mainly for use by the VA staff and contracted architect/engineer firms involved in developing criteria and designing,…
Federal Register 2010, 2011, 2012, 2013, 2014
2011-04-25
... Construction Activities AGENCY: Environmental Protection Agency (EPA). ACTION: Notice. SUMMARY: EPA Regions 1... System (NPDES) general permits for stormwater discharges associated with construction activity in order... permits will be referred to as ``permit'' or ``2008 construction general permit'' or ``2008 CGP.'' This...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-07-08
... Construction Activities AGENCY: Environmental Protection Agency (EPA). ACTION: Notice. SUMMARY: EPA Regions 1... (NPDES) general permits for stormwater discharges associated with construction activity in order to... permits will be referred to as ``permit'' or ``2008 construction general permit'' or ``2008 CGP.'' This...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-12-01
... Television Station Construction Permits Scheduled for February 15, 2011; Notice and Filing Requirements... upcoming auction of certain VHF commercial TV construction permits (Auction 90). This document is intended... December 15, 2010. Bidding for construction permits in Auction 90 is scheduled to begin on February 15...
21 CFR 600.11 - Physical establishment, equipment, animals, and care.
Code of Federal Regulations, 2011 CFR
2011-04-01
... 21 Food and Drugs 7 2011-04-01 2010-04-01 true Physical establishment, equipment, animals, and... designed and constructed to permit thorough cleaning and, where possible, inspection for cleanliness. All... each culture is designed to withstand handling without breaking. (3) Work with spore-forming...
Code of Federal Regulations, 2010 CFR
2010-04-01
... 25 Indians 1 2010-04-01 2010-04-01 false Revocable road use and construction permits for removal... Revocable road use and construction permits for removal of commercial forest products. (a) In accordance... revocable road use and construction permits to users for the purpose of removing forest products. (b) When a...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-09-30
... Construction Permits Scheduled for March 27, 2012; Comment Sought on Competitive Bidding Procedures for Auction... auction of certain FM broadcast construction permits scheduled to commence on March 27, 2012. This... construction permits and seek comment on the procedures to be used for this auction. This auction is scheduled...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-12-02
... Broadcast Construction Permits Scheduled for May 6, 2014; Comment Sought on Competitive Bidding Procedures... announces the auction of certain AM broadcast construction permits. Auction 84 will be a ``closed'' auction..., New York. II. Construction Permits In Auction 84 2. The Bureaus will proceed to auction for 22 new...
10 CFR 2.402 - Separate hearings on separate issues; consolidation of proceedings.
Code of Federal Regulations, 2010 CFR
2010-01-01
... appendix N of part 50 of this chapter for construction permits for nuclear power reactors of a type... Licenses To Construct and/or Operate Nuclear Power Plants of Identical Design at Multiple Sites § 2.402... proceedings. 2.402 Section 2.402 Energy NUCLEAR REGULATORY COMMISSION RULES OF PRACTICE FOR DOMESTIC LICENSING...
Estimating the discharge for ordinary high water levels in Kansas.
DOT National Transportation Integrated Search
2014-09-01
The water resource design community in Kansas, including the Kansas Department of Transportation : (KDOT), is required to obtain appropriate permits for construction projects. Projects that involve stream : modification, including drainage structures...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-02-08
...] Endangered and Threatened Wildlife and Plants; Permit; Construction and Operation of Kaheawa II Wind Energy... application from Kaheawa Wind Power II, LLC (KWP II) for an incidental take permit (permit) under the... construction and operation of the KWP II wind energy facility on the island of Maui. The permit application...
10 CFR 2.1115 - Designation of issues for adjudicatory hearing.
Code of Federal Regulations, 2010 CFR
2010-01-01
... at Civilian Nuclear Power Reactors § 2.1115 Designation of issues for adjudicatory hearing. (a) After... reactor already licensed to operate at the site, or any civilian nuclear power reactor for which a... the issuance of a construction permit or operating license for a civilian nuclear power reactor at...
EPA's Draft 2017 Construction General Permit (CGP)
EPA is preparing to reissue the Construction General Permit (CGP). The general permit, issued under the Clean Water Act's National Pollutant Discharge Elimination System, authorizes stormwater discharges from construction activities.
1980-02-01
for Permit for Construction and Repair of Dam" filed on March 16, 1959. f. Design and Construction History Design data on file with NJDEP include: 1...LAr- Us a-2. hr’s. LA9~ WATF=R? SiQ_~~- SL- !E q VOL ( YFv - mcA>-) (Acmr-- =T.) 2o4~ 2-Ito STORCH ENGINEERS shootL... of 11. Project FmnnK Wmr=X---A-1
Estimating the discharge for ordinary high water levels in Kansas : [technical summary].
DOT National Transportation Integrated Search
2014-09-01
The water resource design community in Kansas, including the Kansas Department : of Transportation (KDOT), is required to obtain appropriate permits for construction : projects. Projects that involve stream modification, including drainage structures...
Storm water best management practices for local roadways.
DOT National Transportation Integrated Search
2015-09-01
Local communities and the Ohio Department of Transportation (ODOT) are required by the Ohio : Environmental Protection Agencys (Ohio EPA) statewide Construction General Permit for Storm : Water Discharges OHC000004 (CGP) to select, design, constru...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-01-28
... Construction Activities AGENCY: Environmental Protection Agency (EPA). ACTION: Notice. SUMMARY: EPA Regions 1... System (NPDES) general permits for stormwater discharges associated with construction activity in order... will be referred to as ``permit'' or ``2008 construction general permit'' or ``2008 CGP.'' The 2008 CGP...
Code of Federal Regulations, 2014 CFR
2014-10-01
... for the design of a bridge can generally be used to determine and rate the load capacity of a bridge... from the service loads can be correlated to the stresses for which the bridge was designed or rated. 3... bridge should keep design, construction, maintenance and repair records readily accessible to permit the...
Code of Federal Regulations, 2013 CFR
2013-10-01
... for the design of a bridge can generally be used to determine and rate the load capacity of a bridge... from the service loads can be correlated to the stresses for which the bridge was designed or rated. 3... bridge should keep design, construction, maintenance and repair records readily accessible to permit the...
Code of Federal Regulations, 2010 CFR
2010-10-01
... for the design of a bridge can generally be used to determine and rate the load capacity of a bridge... from the service loads can be correlated to the stresses for which the bridge was designed or rated. 3... bridge should keep design, construction, maintenance and repair records readily accessible to permit the...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Flanigan, Tom; Pybus, Craig; Roy, Sonya
This report summarizes the results of the Pre-Front End Engineering Design (pre-FEED) phase of a proposed advanced oxy-combustion power generation plant to repower the existing 200 MWe Unit 4 at Ameren Energy Resources’ (AER) Meredosia Power Plant. AER has formed an alliance with Air Liquide Process and Construction, Inc. (ALPC) and Babcock & Wilcox Power Generation Group (B&W PGG) for the design, construction, and testing of the facility, and has contracted with URS Corporation (URS) for preliminary design and Owner’s engineering services. The Project employs oxy-combustion technology – combustion of coal with nearly pure oxygen and recycled flue gas (insteadmore » of air) – to capture approximately 90% of the flue gas CO2 for transport and sequestration by another Project. Plant capacity and configuration has been developed based on the B&W PGG-ALPC cool recycle process firing high-sulfur bituminous coal fuel, assuming baseload plant operation to maximize existing steam turbine capability, with limited consideration for plant redundancy and performance optimization in order to keep plant costs as low as practical. Activities and preliminary results from the pre-FEED phase addressed in this report include the following: Overall plant thermal performance; Equipment sizing and system configuration; Plant operation and control philosophy; Plant emissions and effluents; CO 2 production and recovery characteristics; Project cost estimate and economic evaluation; Integrated project engineering and construction schedule; Project risk and opportunity assessment; Development of Project permitting strategy and requirements During the Phase 2 of the Project, additional design details will be developed and the Phase 1 work products updated to support actual construction and operation of the facility in Phase 3. Additional information will be provided early in Phase 2 to support Ameren-Environmental in finalizing the appropriate permitting strategies and permit applications. Additional performance and reliability enhancements will also be evaluated in Phase 2 to try to improve overall project economics.« less
Federal Register 2010, 2011, 2012, 2013, 2014
2012-05-10
... pipeline that is designed to transport crude oil produced in the Western Canadian Sedimentary Basin (WCSB) and from other sources to a terminus in Steele City, Nebraska where it is designed to link with an... Order 13337: The Departments of Energy, Defense, Transportation, Homeland Security, Justice, Interior...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Shafer, A.L.; Purdy, S.; Tempelis, D.
The La Paz County Regional Landfill is a 65 hectare (160 acre) municipal waste site located near the western border of Arizona between the cities of Parker and Quartzsite. The site is operated under a public/private partnership between the County of La Paz and Browning-Ferris Industries, Inc. (BFI). The County owns the landfill and infrastructure and BFI is responsible for facility improvements, environmental compliance, and daily operations. Following the initial permitting and construction of the first landfill cell, a value engineering review was conducted on the site design and permit requirements. Based on this review, substantial cost saving opportunities weremore » identified. In order to implement the value engineering ideas, the site permit was modified and a new Solid Waste Facilities Plan was Submitted to the Arizona Department of Environmental Quality. This paper discusses the value engineering modifications that were conducted, the revisions to the permits, and the relative cost savings that were realized. The areas addressed include the liner system design, closure design, disposal capacity, and operations plan. Through the use of alternative liners a cost savings of well over 50 percent (as compared to the original permit) will be realized over the life of the landfill.« less
Federal Register 2010, 2011, 2012, 2013, 2014
2013-05-15
... each construction permit exemption claim. WDNR held public hearings on June 27, 28 and 29, 2006, for... required to respond to the construction permit exemption claim submitted. NR 406.04(1q)(1) and (5) for... pollution from construction permit requirements. EPA is proposing to approve these revisions because they...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-10-06
... Construction Permits Scheduled for March 29, 2011; Comment Sought on Competitive Bidding Procedures for Auction... auction of certain FM construction permits scheduled to commence on March 29, 2011 (Auction 91). This... Telecommunications and the Media Bureaus (the Bureaus) announce an auction of certain FM Broadcast construction...
Puget Sound Tidal Energy In-Water Testing and Development Project Final Technical Report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Collar, Craig W
2012-11-16
Tidal energy represents potential for the generation of renewable, emission free, environmentally benign, and cost effective energy from tidal flows. A successful tidal energy demonstration project in Puget Sound, Washington may enable significant commercial development resulting in important benefits for the northwest region and the nation. This project promoted the United States Department of Energy's Wind and Hydropower Technologies Program's goals of advancing the commercial viability, cost-competitiveness, and market acceptance of marine hydrokinetic systems. The objective of the Puget Sound Tidal Energy Demonstration Project is to conduct in-water testing and evaluation of tidal energy technology as a first step towardmore » potential construction of a commercial-scale tidal energy power plant. The specific goal of the project phase covered by this award was to conduct all activities necessary to complete engineering design and obtain construction approvals for a pilot demonstration plant in the Admiralty Inlet region of the Puget Sound. Public Utility District No. 1 of Snohomish County (The District) accomplished the objectives of this award through four tasks: Detailed Admiralty Inlet Site Studies, Plant Design and Construction Planning, Environmental and Regulatory Activities, and Management and Reporting. Pre-Installation studies completed under this award provided invaluable data used for site selection, environmental evaluation and permitting, plant design, and construction planning. However, these data gathering efforts are not only important to the Admiralty Inlet pilot project. Lessons learned, in particular environmental data gathering methods, can be applied to future tidal energy projects in the United States and other parts of the world. The District collaborated extensively with project stakeholders to complete the tasks for this award. This included Federal, State, and local government agencies, tribal governments, environmental groups, and others. All required permit and license applications were completed and submitted under this award, including a Final License Application for a pilot hydrokinetic license from the Federal Energy Regulatory Commission. The tasks described above have brought the project through all necessary requirements to construct a tidal pilot project in Admiralty Inlet with the exception of final permit and license approvals, and the selection of a general contractor to perform project construction.« less
40 CFR 52.2589 - Wisconsin construction permit permanency revision.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 40 Protection of Environment 4 2010-07-01 2010-07-01 false Wisconsin construction permit... (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) Wisconsin § 52.2589 Wisconsin construction permit permanency revision. This plan was originally submitted as Wis...
40 CFR 52.2589 - Wisconsin construction permit permanency revision.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 40 Protection of Environment 5 2012-07-01 2012-07-01 false Wisconsin construction permit... (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) Wisconsin § 52.2589 Wisconsin construction permit permanency revision. This plan was originally submitted as Wis...
40 CFR 52.2589 - Wisconsin construction permit permanency revision.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 40 Protection of Environment 5 2013-07-01 2013-07-01 false Wisconsin construction permit... (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) Wisconsin § 52.2589 Wisconsin construction permit permanency revision. This plan was originally submitted as Wis...
40 CFR 52.2589 - Wisconsin construction permit permanency revision.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 40 Protection of Environment 5 2014-07-01 2014-07-01 false Wisconsin construction permit... (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) Wisconsin § 52.2589 Wisconsin construction permit permanency revision. This plan was originally submitted as Wis...
40 CFR 52.2589 - Wisconsin construction permit permanency revision.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 40 Protection of Environment 4 2011-07-01 2011-07-01 false Wisconsin construction permit... (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) Wisconsin § 52.2589 Wisconsin construction permit permanency revision. This plan was originally submitted as Wis...
[A gearing mechanism with 4 degrees of freedom for robotic applications in medicine].
Pott, P; Weiser, P; Scharf, H P; Schwarz, M
2004-06-01
Applications in robot-aided surgery are currently based on modifications of manipulators used in industrial manufacturing processes. In this paper we describe novel rotatory kinematics for a manipulator, specially developed for deployment in robot-aided surgery. The construction of the gearing mechanism used for the positioning and orientation of a linkage point is described. Forward and inverse kinematics were calculated, and a constructive solution proposed. The gearing mechanism is based on two disk systems, each of which consists of two opposing rotatable discs. The construction was designed in such a way that the linkage point can be positioned freely anywhere within the mechanism's range of motion. The kinematics thus permits an x-y-positioning via rotating movements only. The spatial arrangement of two of such disc systems permits movements in four degrees of freedom (DOF). The construction is compact, but can be further miniaturized, is flexible and manufacturing costs are low. On the basis of this mechanical concept a new, small automated manipulator for surgical application will be developed.
40 CFR 49.155 - Permit requirements.
Code of Federal Regulations, 2014 CFR
2014-07-01
... applies to your permit if you are subject to this program under § 49.153(a) for construction of a new... of the permit and the date by which you must commence construction in order for your permit to remain... determine compliance with the permit. For any such information claimed to be confidential, you must also...
33 CFR 115.60 - Procedures for handling applications for bridge construction permits.
Code of Federal Regulations, 2011 CFR
2011-07-01
... applications for bridge construction permits. 115.60 Section 115.60 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY BRIDGES BRIDGE LOCATIONS AND CLEARANCES; ADMINISTRATIVE PROCEDURES § 115.60 Procedures for handling applications for bridge construction permits. The following procedures will be...
33 CFR 115.60 - Procedures for handling applications for bridge construction permits.
Code of Federal Regulations, 2010 CFR
2010-07-01
... applications for bridge construction permits. 115.60 Section 115.60 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY BRIDGES BRIDGE LOCATIONS AND CLEARANCES; ADMINISTRATIVE PROCEDURES § 115.60 Procedures for handling applications for bridge construction permits. The following procedures will be...
DOE Office of Scientific and Technical Information (OSTI.GOV)
McCoy, Gilbert A.
1992-12-01
The design, construction and operation of a hydropower project can result in many potential impacts. These potential impacts are of concern to a host of federal, state, and local authorities. Early consultation with land and water management, fish and wildlife resource protection, and health and human safety-oriented agencies should occur to determine specific concerns and study requirements for each proposed project. This Guide to Permitting and Licensing outlines the characteristic features of attractive hydropower sites; summarizes an array of developmental constraints; illustrates potential environmental impacts and concerns; and summarizes all federal, state, and local permitting and licensing requirements.
DOE Office of Scientific and Technical Information (OSTI.GOV)
McCoy, Gilbert A.
1992-12-01
The design, construction and operation of a hydropower project can result in many potential impacts. These potential impacts are of concern to a host of federal, state, and local authorities. Early consultation with land and water management, fish and wildlife resource protection, and health and human safety-oriented agencies should occur to determine specific concerns and study requirements for each proposed project. This Guide to Permitting and Licensing outlines the characteristic features of attractive hydropower sites; summarizes an array of developmental constraints; illustrates potential environmental impacts and concerns; and summarizes all federal, state, and local permitting and licensing requirements.
47 CFR 73.4015 - Applications for AM and FM construction permits, incomplete or defective.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 47 Telecommunication 4 2010-10-01 2010-10-01 false Applications for AM and FM construction permits, incomplete or defective. 73.4015 Section 73.4015 Telecommunication FEDERAL COMMUNICATIONS COMMISSION....4015 Applications for AM and FM construction permits, incomplete or defective. See Public Notice, FCC...
47 CFR 73.4015 - Applications for AM and FM construction permits, incomplete or defective.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 47 Telecommunication 4 2011-10-01 2011-10-01 false Applications for AM and FM construction permits, incomplete or defective. 73.4015 Section 73.4015 Telecommunication FEDERAL COMMUNICATIONS COMMISSION....4015 Applications for AM and FM construction permits, incomplete or defective. See Public Notice, FCC...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-03-29
... reviewing and acting on specific air quality construction permit applications received by the New Mexico... Promulgation of Implementation Plans; New Mexico; Construction Permit Fees AGENCY: Environmental Protection... replace existing rules, and revisions to the applicable State Implementation Plan (SIP) for New Mexico...
Code of Federal Regulations, 2010 CFR
2010-04-01
... CURRENT GOOD MANUFACTURING PRACTICE FOR MEDICATED FEEDS Construction and Maintenance of Facilities and Equipment § 225.30 Equipment. (a) Equipment which is designed to perform its intended function and is properly installed and used is essential to the manufacture of medicated feeds. Such equipment permits...
33 CFR 149.145 - What are the requirements for curbs, gutters, drains, and reservoirs?
Code of Federal Regulations, 2010 CFR
2010-07-01
... GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) DEEPWATER PORTS DEEPWATER PORTS: DESIGN, CONSTRUCTION..., drains, and reservoirs? Each pumping platform complex must have enough curbs, gutters, drains, and... ocean according to the port's National Pollution Discharge Elimination System permit. ...
33 CFR 149.145 - What are the requirements for curbs, gutters, drains, and reservoirs?
Code of Federal Regulations, 2011 CFR
2011-07-01
... GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) DEEPWATER PORTS DEEPWATER PORTS: DESIGN, CONSTRUCTION..., drains, and reservoirs? Each pumping platform complex must have enough curbs, gutters, drains, and... ocean according to the port's National Pollution Discharge Elimination System permit. ...
40 CFR 270.62 - Hazardous waste incinerator permits.
Code of Federal Regulations, 2010 CFR
2010-07-01
...) Stack gas monitoring and pollution control equipment. (H) Nozzle and burner design. (I) Construction.... (iii) A detailed description of sampling and monitoring procedures, including sampling and monitoring locations in the system, the equipment to be used, sampling and monitoring frequency, and planned analytical...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-02-23
... Construction Permits Scheduled for July 20, 2010; Auction 88 Applicants Must Provide Supplemental Information..., AM, and FM Translator construction permits scheduled to commence on July 20, 2010 (Auction 88). This.... Any envelopes must be disposed of before entering the building. Commercial overnight mail (other than...
40 CFR 49.9868 - Permits to construct.
Code of Federal Regulations, 2010 CFR
2010-07-01
... TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation Plan for the Burns Paiute Tribe of the Burns Paiute Indian Colony of Oregon § 49.9868 Permits to construct. Permits to...
33 CFR Appendix A to Part 230 - Processing Corps NEPA Documents
Code of Federal Regulations, 2010 CFR
2010-07-01
... Corps NEPA Documents NEFA documents for Civil Works activities other than permits will be processed in... Preconstruction Engineering, and Design, Construction, and Completed Projects in an Operations and Maintenance... reconnaissance phase, the district commander should undertake environmental studies along with engineering...
Debunking the Fire Sprinkler Myth.
ERIC Educational Resources Information Center
O'Connell, Thomas
1996-01-01
Sprinklers can protect school buildings, save lives, and actually reduce construction costs. Sprinkler-system costs can be easily offset by insurance savings, as well as by specific alternatives or design options permitted by nationally recognized building codes in view of the superior protection that sprinklers provide. (MLF)
40 CFR 147.2924 - Area permits.
Code of Federal Regulations, 2011 CFR
2011-07-01
... application; (2) All wells are within the same well field, project, reservoir or similar unit; (3) All wells... construction, monitoring, reporting, operation and abandonment for all wells authorized by the permit. (c) Area permits can authorize the construction and operation of new wells within the permit area, if: (1) The...
40 CFR 147.2924 - Area permits.
Code of Federal Regulations, 2010 CFR
2010-07-01
... application; (2) All wells are within the same well field, project, reservoir or similar unit; (3) All wells... construction, monitoring, reporting, operation and abandonment for all wells authorized by the permit. (c) Area permits can authorize the construction and operation of new wells within the permit area, if: (1) The...
Code of Federal Regulations, 2011 CFR
2011-01-01
... costs of the proposed action or an evaluation of alternative energy sources. (3) For other than light... 10 Energy 2 2011-01-01 2011-01-01 false Environmental report-construction permit, early site permit, or combined license stage. 51.50 Section 51.50 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED...
Code of Federal Regulations, 2013 CFR
2013-01-01
... costs of the proposed action or an evaluation of alternative energy sources. (3) For other than light... 10 Energy 2 2013-01-01 2013-01-01 false Environmental report-construction permit, early site permit, or combined license stage. 51.50 Section 51.50 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED...
Code of Federal Regulations, 2010 CFR
2010-01-01
... costs of the proposed action or an evaluation of alternative energy sources. (3) For other than light... 10 Energy 2 2010-01-01 2010-01-01 false Environmental report-construction permit, early site permit, or combined license stage. 51.50 Section 51.50 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED...
Code of Federal Regulations, 2014 CFR
2014-01-01
... costs of the proposed action or an evaluation of alternative energy sources. (3) For other than light... 10 Energy 2 2014-01-01 2014-01-01 false Environmental report-construction permit, early site permit, or combined license stage. 51.50 Section 51.50 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED...
Code of Federal Regulations, 2012 CFR
2012-01-01
... costs of the proposed action or an evaluation of alternative energy sources. (3) For other than light... 10 Energy 2 2012-01-01 2012-01-01 false Environmental report-construction permit, early site permit, or combined license stage. 51.50 Section 51.50 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED...
40 CFR 62.14351 - Definitions.
Code of Federal Regulations, 2014 CFR
2014-07-01
... volume design capacity of the landfill by either horizontal or vertical expansion based on its permitted... construction on the horizontal or vertical expansion. Municipal solid waste landfill or MSW landfill means an entire disposal facility in a contiguous geographical space where household waste is placed in or on land...
40 CFR 62.14351 - Definitions.
Code of Federal Regulations, 2010 CFR
2010-07-01
... volume design capacity of the landfill by either horizontal or vertical expansion based on its permitted... construction on the horizontal or vertical expansion. Municipal solid waste landfill or MSW landfill means an entire disposal facility in a contiguous geographical space where household waste is placed in or on land...
10 CFR 50.35 - Issuance of construction permits. 1
Code of Federal Regulations, 2011 CFR
2011-01-01
... principal architectural and engineering criteria for the design, and has identified the major features or... features or components, if any, which require research and development have been described by the applicant and the applicant has identified, and there will be conducted, a research and development program...
10 CFR 50.35 - Issuance of construction permits. 1
Code of Federal Regulations, 2010 CFR
2010-01-01
... principal architectural and engineering criteria for the design, and has identified the major features or... features or components, if any, which require research and development have been described by the applicant and the applicant has identified, and there will be conducted, a research and development program...
Code of Federal Regulations, 2012 CFR
2012-04-01
... 25 Indians 1 2012-04-01 2011-04-01 true Revocable road use and construction permits for removal of... road use and construction permits for removal of commercial forest products. (a) In accordance with 25 U.S.C. 415 as amended, the Secretary may request tribes and/or other beneficial owners to sign...
Code of Federal Regulations, 2013 CFR
2013-04-01
... 25 Indians 1 2013-04-01 2013-04-01 false Revocable road use and construction permits for removal... Revocable road use and construction permits for removal of commercial forest products. (a) In accordance with 25 U.S.C. 415 as amended, the Secretary may request tribes and/or other beneficial owners to sign...
Code of Federal Regulations, 2014 CFR
2014-04-01
... 25 Indians 1 2014-04-01 2014-04-01 false Revocable road use and construction permits for removal... Revocable road use and construction permits for removal of commercial forest products. (a) In accordance with 25 U.S.C. 415 as amended, the Secretary may request tribes and/or other beneficial owners to sign...
Code of Federal Regulations, 2011 CFR
2011-04-01
... 25 Indians 1 2011-04-01 2011-04-01 false Revocable road use and construction permits for removal... Revocable road use and construction permits for removal of commercial forest products. (a) In accordance with 25 U.S.C. 415 as amended, the Secretary may request tribes and/or other beneficial owners to sign...
Code of Federal Regulations, 2014 CFR
2014-01-01
... concerning the benefits assessment (e.g., need for power) or alternative energy sources if those issues were... 10 Energy 2 2014-01-01 2014-01-01 false Public hearings in proceedings for issuance of construction permits or early site permits; limited work authorizations. 51.105 Section 51.105 Energy NUCLEAR...
Code of Federal Regulations, 2012 CFR
2012-01-01
... concerning the benefits assessment (e.g., need for power) or alternative energy sources if those issues were... 10 Energy 2 2012-01-01 2012-01-01 false Public hearings in proceedings for issuance of construction permits or early site permits; limited work authorizations. 51.105 Section 51.105 Energy NUCLEAR...
Code of Federal Regulations, 2013 CFR
2013-01-01
... concerning the benefits assessment (e.g., need for power) or alternative energy sources if those issues were... 10 Energy 2 2013-01-01 2013-01-01 false Public hearings in proceedings for issuance of construction permits or early site permits; limited work authorizations. 51.105 Section 51.105 Energy NUCLEAR...
Code of Federal Regulations, 2010 CFR
2010-01-01
... concerning the benefits assessment (e.g., need for power) or alternative energy sources if those issues were... 10 Energy 2 2010-01-01 2010-01-01 false Public hearings in proceedings for issuance of construction permits or early site permits; limited work authorizations. 51.105 Section 51.105 Energy NUCLEAR...
Code of Federal Regulations, 2011 CFR
2011-01-01
... concerning the benefits assessment (e.g., need for power) or alternative energy sources if those issues were... 10 Energy 2 2011-01-01 2011-01-01 false Public hearings in proceedings for issuance of construction permits or early site permits; limited work authorizations. 51.105 Section 51.105 Energy NUCLEAR...
21 CFR 111.20 - What design and construction requirements apply to your physical plant?
Code of Federal Regulations, 2012 CFR
2012-04-01
... MANUFACTURING, PACKAGING, LABELING, OR HOLDING OPERATIONS FOR DIETARY SUPPLEMENTS Physical Plant and Grounds... use in the manufacture, packaging, labeling, or holding of dietary supplements must: (a) Be suitable... dietary supplements during manufacturing, packaging, labeling, or holding; (c) Permit the use of proper...
21 CFR 111.20 - What design and construction requirements apply to your physical plant?
Code of Federal Regulations, 2014 CFR
2014-04-01
... MANUFACTURING, PACKAGING, LABELING, OR HOLDING OPERATIONS FOR DIETARY SUPPLEMENTS Physical Plant and Grounds... use in the manufacture, packaging, labeling, or holding of dietary supplements must: (a) Be suitable... dietary supplements during manufacturing, packaging, labeling, or holding; (c) Permit the use of proper...
10 CFR 50.59 - Changes, tests, and experiments.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 10 Energy 1 2011-01-01 2011-01-01 false Changes, tests, and experiments. 50.59 Section 50.59..., Limitations, and Conditions of Licenses and Construction Permits § 50.59 Changes, tests, and experiments. (a..., the facility or procedures that affects a design function, method of performing or controlling the...
10 CFR 50.59 - Changes, tests, and experiments.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 10 Energy 1 2010-01-01 2010-01-01 false Changes, tests, and experiments. 50.59 Section 50.59..., Limitations, and Conditions of Licenses and Construction Permits § 50.59 Changes, tests, and experiments. (a..., the facility or procedures that affects a design function, method of performing or controlling the...
75 FR 33361 - Notice of Issuance of Regulatory Guide
Federal Register 2010, 2011, 2012, 2013, 2014
2010-06-11
... staff needs in its review of applications for permits and licenses. Revision 4 of Regulatory Guide 1.28... (Design and Construction).'' Proposed RG 1.28, Revision 4, extends the scope of the NRC's endorsement to...: Nuclear Regulatory Commission. ACTION: Notice of Issuance and Availability of Regulatory Guide 1.28...
47 CFR 73.5007 - Designated entity provisions.
Code of Federal Regulations, 2013 CFR
2013-10-01
... lower the cost of its winning bid on any broadcast construction permit. Any winning bidder claiming new... underlying its new entrant bidding credit eligibility claim, or that of any attributable interest-holder in... of the new entrant bidding credit claimed in the applicant's FCC Form 175 application, if the change...
47 CFR 73.5007 - Designated entity provisions.
Code of Federal Regulations, 2012 CFR
2012-10-01
... lower the cost of its winning bid on any broadcast construction permit. Any winning bidder claiming new... underlying its new entrant bidding credit eligibility claim, or that of any attributable interest-holder in... of the new entrant bidding credit claimed in the applicant's FCC Form 175 application, if the change...
47 CFR 73.5007 - Designated entity provisions.
Code of Federal Regulations, 2010 CFR
2010-10-01
... lower the cost of its winning bid on any broadcast construction permit. Any winning bidder claiming new... underlying its new entrant bidding credit eligibility claim, or that of any attributable interest-holder in... of the new entrant bidding credit claimed in the applicant's FCC Form 175 application, if the change...
47 CFR 73.5007 - Designated entity provisions.
Code of Federal Regulations, 2011 CFR
2011-10-01
... lower the cost of its winning bid on any broadcast construction permit. Any winning bidder claiming new... underlying its new entrant bidding credit eligibility claim, or that of any attributable interest-holder in... of the new entrant bidding credit claimed in the applicant's FCC Form 175 application, if the change...
47 CFR 73.5007 - Designated entity provisions.
Code of Federal Regulations, 2014 CFR
2014-10-01
... lower the cost of its winning bid on any broadcast construction permit. Any winning bidder claiming new... underlying its new entrant bidding credit eligibility claim, or that of any attributable interest-holder in... of the new entrant bidding credit claimed in the applicant's FCC Form 175 application, if the change...
Specifically Designed Constructed Wetlands: A Novel Treatment Approach for Scrubber Wastewater
DOE Office of Scientific and Technical Information (OSTI.GOV)
John H. Rodgers Jr; James W. Castle; Chris Arrington: Derek Eggert
2005-09-01
A pilot-scale wetland treatment system was specifically designed and constructed at Clemson University to evaluate removal of mercury, selenium, and other constituents from flue gas desulfurization (FGD) wastewater. Specific objectives of this research were: (1) to measure performance of a pilot-scale constructed wetland treatment system in terms of decreases in targeted constituents (Hg, Se and As) in the FGD wastewater from inflow to outflow; (2) to determine how the observed performance is achieved (both reactions and rates); and (3) to measure performance in terms of decreased bioavailability of these elements (i.e. toxicity of sediments in constructed wetlands and toxicity ofmore » outflow waters from the treatment system). Performance of the pilot-scale constructed wetland treatment systems was assessed using two criteria: anticipated NPDES permit levels and toxicity evaluations using two sentinel toxicity-testing organisms (Ceriodaphnia dubia and Pimephales promelas). These systems performed efficiently with varied inflow simulations of FGD wastewaters removing As, Hg, and Se concentrations below NPDES permit levels and reducing the toxicity of simulated FGD wastewater after treatment with the constructed wetland treatment systems. Sequential extraction procedures indicated that these elements (As, Hg, and Se) were bound to residual phases within sediments of these systems, which should limit their bioavailability to aquatic biota. Sediments collected from constructed wetland treatment systems were tested to observe toxicity to Hyalella azteca or Chironomus tetans. Complete survival (100%) was observed for H. azteca in all cells of the constructed wetland treatment system and C. tentans had an average of 91% survival over the three treatment cells containing sediments. Survival and growth of H. azteca and C. tentans did not differ significantly between sediments from the constructed wetland treatment system and controls. Since the sediments of the constructed wetland treatment system are repositories for As, Hg, and Se and the bioavailability of these elements decreased after deposition, the pilot-scale constructed wetland treatment system contributed significantly to mitigation of risks to aquatic life from these elements.« less
Since 2010, the State of California has required construction operators to utilize the electronic Storm Water Application and Report Tracking System (SMARTS) for construction projects covered by the General Construction Permit. The General Construction permit encourages BMP and G...
28 CFR 36.401 - New construction.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 28 Judicial Administration 1 2013-07-01 2013-07-01 false New construction. 36.401 Section 36.401... ACCOMMODATIONS AND IN COMMERCIAL FACILITIES New Construction and Alterations § 36.401 New construction. (a...— (i) If the last application for a building permit or permit extension for the facility is certified...
28 CFR 36.401 - New construction.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 28 Judicial Administration 1 2011-07-01 2011-07-01 false New construction. 36.401 Section 36.401... ACCOMMODATIONS AND IN COMMERCIAL FACILITIES New Construction and Alterations § 36.401 New construction. (a...— (i) If the last application for a building permit or permit extension for the facility is certified...
28 CFR 36.401 - New construction.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 28 Judicial Administration 1 2012-07-01 2012-07-01 false New construction. 36.401 Section 36.401... ACCOMMODATIONS AND IN COMMERCIAL FACILITIES New Construction and Alterations § 36.401 New construction. (a...— (i) If the last application for a building permit or permit extension for the facility is certified...
28 CFR 36.401 - New construction.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 28 Judicial Administration 1 2014-07-01 2014-07-01 false New construction. 36.401 Section 36.401... ACCOMMODATIONS AND IN COMMERCIAL FACILITIES New Construction and Alterations § 36.401 New construction. (a...— (i) If the last application for a building permit or permit extension for the facility is certified...
28 CFR 36.401 - New construction.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 28 Judicial Administration 1 2010-07-01 2010-07-01 false New construction. 36.401 Section 36.401... ACCOMMODATIONS AND IN COMMERCIAL FACILITIES New Construction and Alterations § 36.401 New construction. (a...— (i) If the last application for a building permit or permit extension for the facility is certified...
Space Programs Summary 37-33. Volume 3. The Deep Space Network for the period 1 March-30 April 1965
1965-05-31
designed to communicate To improve the data rate and distance capability, a 210-ft with, and permit control of, spacecraft designed for deep antenna is...51 experienced doppler problems. It was neces- tracking momentarily to make this change. It was de - sary to determine the bias oscillator frequencies...is being designed and constructed for the Mars site of the Gold- stone space communications station. The operating fre- quency of the AAS will be at
49 CFR 238.407 - Anti-climbing mechanism.
Code of Federal Regulations, 2010 CFR
2010-10-01
... power car constructed with a crash energy management design is permitted to crush in a controlled manner... Equipment § 238.407 Anti-climbing mechanism. (a) Each power car shall have an anti-climbing mechanism at its..., including between units of articulated cars or other permanently joined units of cars, shall have an anti...
49 CFR 238.407 - Anti-climbing mechanism.
Code of Federal Regulations, 2012 CFR
2012-10-01
... power car constructed with a crash energy management design is permitted to crush in a controlled manner... Equipment § 238.407 Anti-climbing mechanism. (a) Each power car shall have an anti-climbing mechanism at its..., including between units of articulated cars or other permanently joined units of cars, shall have an anti...
49 CFR 238.407 - Anti-climbing mechanism.
Code of Federal Regulations, 2011 CFR
2011-10-01
... power car constructed with a crash energy management design is permitted to crush in a controlled manner... Equipment § 238.407 Anti-climbing mechanism. (a) Each power car shall have an anti-climbing mechanism at its..., including between units of articulated cars or other permanently joined units of cars, shall have an anti...
49 CFR 238.407 - Anti-climbing mechanism.
Code of Federal Regulations, 2013 CFR
2013-10-01
... power car constructed with a crash energy management design is permitted to crush in a controlled manner... Equipment § 238.407 Anti-climbing mechanism. (a) Each power car shall have an anti-climbing mechanism at its..., including between units of articulated cars or other permanently joined units of cars, shall have an anti...
49 CFR 238.407 - Anti-climbing mechanism.
Code of Federal Regulations, 2014 CFR
2014-10-01
... power car constructed with a crash energy management design is permitted to crush in a controlled manner... Equipment § 238.407 Anti-climbing mechanism. (a) Each power car shall have an anti-climbing mechanism at its..., including between units of articulated cars or other permanently joined units of cars, shall have an anti...
DEVELOPMENT OF STANDARD AND CORRELATED DIMENSIONS OF MATERIAL-COMPONENTS IN SCHOOL CONSTRUCTION.
ERIC Educational Resources Information Center
GRAHAM, LEON R.
THE OBJECTIVE WAS TO DEVELOP A CORRELATED MODULAR SYSTEM OF SCHOOL DESIGN WHICH WOULD PERMIT A VARIETY OF COMPETITIVE MATERIALS AND EQUIPMENT COMPONENTS TO BE MASS PRODUCED FOR SCHOOLS AND USED INTERCHANGEABLY AND FLEXIBLY. THE DEVELOPED SYSTEM PROPOSES FUNDAMENTAL AND SIGNIFICANT INNOVATIONS WHICH HAVE NOT BEEN ADVANCED BY EARLIER PROGRAMS. THIS…
Toy Modification Note: Build It Yourself Battery Interrupter. Revised.
ERIC Educational Resources Information Center
Vanderheiden, Gregg C.; Brandenburg, S.
This toy modification note presents illustrated instructions on how to build a battery interrupter that permits on/off control of battery-operated toys without modification of the toys themselves. The device allows for a separate control switch which can be custom designed to fit a handicapped user's needs. Information on the construction and use…
40 CFR 52.343 - Significant deterioration of air quality.
Code of Federal Regulations, 2012 CFR
2012-07-01
... constructed prior to September 2, 1986 and which have not otherwise subjected themselves to Colorado's PSD permitting regulations after September 2, 1986, either through application to Colorado for a PSD permit (in the case of those sources which improperly constructed without obtaining a PSD permit) or through...
40 CFR 52.343 - Significant deterioration of air quality.
Code of Federal Regulations, 2014 CFR
2014-07-01
... constructed prior to September 2, 1986 and which have not otherwise subjected themselves to Colorado's PSD permitting regulations after September 2, 1986, either through application to Colorado for a PSD permit (in the case of those sources which improperly constructed without obtaining a PSD permit) or through...
40 CFR 52.343 - Significant deterioration of air quality.
Code of Federal Regulations, 2013 CFR
2013-07-01
... constructed prior to September 2, 1986 and which have not otherwise subjected themselves to Colorado's PSD permitting regulations after September 2, 1986, either through application to Colorado for a PSD permit (in the case of those sources which improperly constructed without obtaining a PSD permit) or through...
40 CFR 52.343 - Significant deterioration of air quality.
Code of Federal Regulations, 2011 CFR
2011-07-01
... constructed prior to September 2, 1986 and which have not otherwise subjected themselves to Colorado's PSD permitting regulations after September 2, 1986, either through application to Colorado for a PSD permit (in the case of those sources which improperly constructed without obtaining a PSD permit) or through...
46 CFR 287.7 - Circumstances permitting reimbursement from a construction reserve fund.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 8 2010-10-01 2010-10-01 false Circumstances permitting reimbursement from a... Circumstances permitting reimbursement from a construction reserve fund. (a) Payments prior to establishment of... this part, draw against such fund as reimbursement for the amount, if any, of other funds which, with...
Design and installation of a next generation pilot scale fermentation system.
Junker, B; Brix, T; Lester, M; Kardos, P; Adamca, J; Lynch, J; Schmitt, J; Salmon, P
2003-01-01
Four new fermenters were designed and constructed for use in secondary metabolite cultivations, bioconversions, and enzyme production. A new PC/PLC-based control system also was implemented using GE Fanuc PLCs, Genius I/O blocks, and Fix Dynamics SCADA software. These systems were incorporated into an industrial research fermentation pilot plant, designed and constructed in the early 1980s. Details of the design of these new fermenters and the new control system are described and compared with the existing installation for expected effectiveness. In addition, the reasoning behind selection of some of these features has been included. Key to the design was the goal of preserving similarity between the new and previously existing and successfully utilized fermenter hardware and software installations where feasible but implementing improvements where warranted and beneficial. Examples of enhancements include strategic use of Inconel as a material of construction to reduce corrosion, piping layout design for simplified hazardous energy isolation, on-line calculation and control of nutrient feed rates, and the use of field I/O modules located near the vessel to permit low-cost addition of new instrumentation.
47 CFR 73.3533 - Application for construction permit or modification of construction permit.
Code of Federal Regulations, 2011 CFR
2011-10-01
... Changes in a Low Power TV, TV Translator or TV Booster Station.” (6) FCC Form 349, “Application for Authority to Construct or Make Changes in an FM Translator or FM Booster Station.” (7) FCC Form 318...
47 CFR 73.3533 - Application for construction permit or modification of construction permit.
Code of Federal Regulations, 2012 CFR
2012-10-01
... Changes in a Low Power TV, TV Translator or TV Booster Station.” (6) FCC Form 349, “Application for Authority to Construct or Make Changes in an FM Translator or FM Booster Station.” (7) FCC Form 318...
47 CFR 73.3533 - Application for construction permit or modification of construction permit.
Code of Federal Regulations, 2010 CFR
2010-10-01
... Changes in a Low Power TV, TV Translator or TV Booster Station.” (6) FCC Form 349, “Application for Authority to Construct or Make Changes in an FM Translator or FM Booster Station.” (7) FCC Form 318...
25 CFR 166.316 - Can a permittee construct improvements on permitted Indian land?
Code of Federal Regulations, 2010 CFR
2010-04-01
... 25 Indians 1 2010-04-01 2010-04-01 false Can a permittee construct improvements on permitted Indian land? 166.316 Section 166.316 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR LAND AND WATER GRAZING PERMITS Land and Operations Management Conservation Practices and Improvements § 166...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-07-09
...'') has extended the Prevention of Significant Deterioration (``PSD'') permit deadline for commencing construction for a final Clean Air Act PSD permit that authorizes Avenal Power Center, LLC (``APC'') to...: EPA's PSD permit for the AEP became effective on August 18, 2011, and included a deadline for...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-03-22
.... mail: David L. Hankla, Field Supervisor, Jacksonville Ecological Services Field Office, Attn: Permit... construction of a commercial development, and seeks a 5-year permit. The 7.7-ac project is located on parcel 09... project includes construction of a commercial development and the associated infrastructure, and...
33 CFR 323.4 - Discharges not requiring permits.
Code of Federal Regulations, 2013 CFR
2013-07-01
... discrete structures and the installation of support facilities necessary for construction and utilization... construction of any canal, ditch, dike or other waterway or structure which drains or otherwise significantly... construction of any such structure or waterway requires a permit. (D) Plowing means all forms of primary...
33 CFR 323.4 - Discharges not requiring permits.
Code of Federal Regulations, 2011 CFR
2011-07-01
... discrete structures and the installation of support facilities necessary for construction and utilization... construction of any canal, ditch, dike or other waterway or structure which drains or otherwise significantly... construction of any such structure or waterway requires a permit. (D) Plowing means all forms of primary...
33 CFR 323.4 - Discharges not requiring permits.
Code of Federal Regulations, 2014 CFR
2014-07-01
... discrete structures and the installation of support facilities necessary for construction and utilization... construction of any canal, ditch, dike or other waterway or structure which drains or otherwise significantly... construction of any such structure or waterway requires a permit. (D) Plowing means all forms of primary...
33 CFR 323.4 - Discharges not requiring permits.
Code of Federal Regulations, 2012 CFR
2012-07-01
... discrete structures and the installation of support facilities necessary for construction and utilization... construction of any canal, ditch, dike or other waterway or structure which drains or otherwise significantly... construction of any such structure or waterway requires a permit. (D) Plowing means all forms of primary...
76 FR 24874 - Initiation of Scoping for an Environmental Assessment (EA)
Federal Register 2010, 2011, 2012, 2013, 2014
2011-05-03
...) General Permit for Discharges from Construction Activities. The EA will evaluate the potential environmental impacts from the discharge of pollutants associated with stormwater runoff from construction... days of the date of the publication of the Proposed Construction General Permit in the Federal Register...
Computer-aided dental prostheses construction using reverse engineering.
Solaberrieta, E; Minguez, R; Barrenetxea, L; Sierra, E; Etxaniz, O
2014-01-01
The implementation of computer-aided design/computer-aided manufacturing (CAD/CAM) systems with virtual articulators, which take into account the kinematics, constitutes a breakthrough in the construction of customised dental prostheses. This paper presents a multidisciplinary protocol involving CAM techniques to produce dental prostheses. This protocol includes a step-by-step procedure using innovative reverse engineering technologies to transform completely virtual design processes into customised prostheses. A special emphasis is placed on a novel method that permits a virtual location of the models. The complete workflow includes the optical scanning of the patient, the use of reverse engineering software and, if necessary, the use of rapid prototyping to produce CAD temporary prostheses.
Scavenging a Piston-ported Two-stroke Cylinder
NASA Technical Reports Server (NTRS)
Rogowski, A R; Bouchard, C L
1938-01-01
An investigation was made with a specially designed engine to determine the scavenging characteristics of a large number of inlet-port shapes and arrangements and the optimum port arrangement and timing for this particular type of engine. A special cylinder construction permitted wide variations in timing for this particular type of engine. A special cylinder construction permitted wide variations in timing as well as in shape and arrangement of both the inlet and exhaust ports. The study of the effect of port shape combinations and timings on engine performance was made using illuminating gas as a fuel. Through variations in inlet-port arrangement and port timings, the value of the scavenging efficiency was increased from an original 44 percent to approximately 67 percent with a corresponding increase in power. With the optimum port arrangement and timing determined, a large number of performance runs were made under both spark-ignition and compression-ignition operation.
Federal Register 2010, 2011, 2012, 2013, 2014
2012-03-19
.... (as shown in Attachment 1)) EA-12-049 I The Licensees and construction permits (CP) holders \\1..., ``Licenses, Certifications, and Approvals for Nuclear Power Plants.'' \\1\\ CP holders, as used in this Order... that additional requirements must be imposed on Licensees or CP holders to increase the [[Page 16092...
47 CFR 73.3598 - Period of construction.
Code of Federal Regulations, 2011 CFR
2011-10-01
... a showing of good cause. The LPFM permittee must file for an extension on or before the expiration... original construction permit shall toll when construction is prevented by the following causes not under... natural disasters (e.g., floods, tornados, hurricanes, or earthquakes); (2) The grant of the permit is the...
47 CFR 73.3598 - Period of construction.
Code of Federal Regulations, 2013 CFR
2013-10-01
... a showing of good cause. The LPFM permittee must file for an extension on or before the expiration... original construction permit shall toll when construction is prevented by the following causes not under... natural disasters (e.g., floods, tornados, hurricanes, or earthquakes); (2) The grant of the permit is the...
47 CFR 73.3598 - Period of construction.
Code of Federal Regulations, 2014 CFR
2014-10-01
... a showing of good cause. The LPFM permittee must file for an extension on or before the expiration... original construction permit shall toll when construction is prevented by the following causes not under... natural disasters (e.g., floods, tornados, hurricanes, or earthquakes); (2) The grant of the permit is the...
47 CFR 73.3598 - Period of construction.
Code of Federal Regulations, 2012 CFR
2012-10-01
... a showing of good cause. The LPFM permittee must file for an extension on or before the expiration... original construction permit shall toll when construction is prevented by the following causes not under... natural disasters (e.g., floods, tornados, hurricanes, or earthquakes); (2) The grant of the permit is the...
Code of Federal Regulations, 2010 CFR
2010-04-01
... 25 Indians 1 2010-04-01 2010-04-01 false What happens to improvements constructed on Indian lands when the permit has been terminated? 166.317 Section 166.317 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR LAND AND WATER GRAZING PERMITS Land and Operations Management Conservation...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-10-24
.... Herrington, Field Supervisor, Jacksonville Ecological Services Field Office, Attn: Permit number TE15414B-0... construction of commercial developments, and they seek a 10-year permit. The 7.81-ac project is located on... East, Lake County, Florida. The project includes construction of a commercial development and the...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Burton, P.M.
This Construction Quality Assurance (CQA) Report provides documentation that Bid Option 2 of the Y-12 Plant Construction Demolition Landfill 7 (CDL-7) was constructed in substantial compliance with the Tennessee Department of Environment and Conservation (TDEC) approved design, as indicated and specified in the permit drawings, approved changes, and specifications. CDL-7 is located in Anderson County on the south side of Chestnut Ridge, approximately 0.5 miles south of the Y-12 Plant in Oak Ridge, Tennessee. This report applies specifically to the limits of excavation for Area No. 1 portions of the perimeter maintenance road and drainage channel and Sedimentation Pond No.more » 3. A partial ``As-Built`` survey was performed and is included.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Evans, G.C.
The Environmental Restoration Disposal Facility (ERDF) is to accept both CERCLA (EPA-regulated) and RCRA (Ecology-regulated) remediation waste. The ERDF is considered part of the overall remediation strategy on the Hanford Site, and as such, determination of ERDF viability has followed both RCRA and CERCLA decision making processes. Typically, determination of the viability of a unit, such as the ERDF, would occur as part of record of decision (ROD) or permit modification for each remediation site before construction of the ERDF. However, because construction of the ERDF may take a significant amount of time, it is necessary to begin design andmore » construction of the ERDF before final RODs/permit modifications for the remediation sites. This will allow movement of waste to occur quickly once the final remediation strategy for the RCRA and CERCLA past-practice units is determined. Construction of the ERDF is a unique situation relative to Hanford Facility cleanup, requiring a Hanford Facility specific process be developed for implementing the ERDF that would satisfy both RCRA and CERCLA requirements. While the ERDF will play a significant role in the remediation process, initiation of the ERDF does not preclude the evaluation of remedial alternatives at each remediation site. To facilitate this, the January 1994 amendment to the Tri-Party Agreement recognizes the necessity for the ERDF, and the Tri-Party Agreement states: ``Ecology, EPA, and DOE agree to proceed with the steps necessary to design, approve, construct, and operate such a ... facility.`` The Tri-Party Agreement requires the DOE-RL to prepare a comprehensive ``package`` for the EPA and Ecology to consider in evaluating the ERDF. The package is to address the criteria listed in 40 CFR 264.552(c) for corrective action management unit (CAMU) designation and a CERCLA ROD. This CAMU application is submitted as part of the Tri-Party Agreement-required information package.« less
NASA Technical Reports Server (NTRS)
Sweet, H. C.; Simmonds, R. C.
1976-01-01
It was proposed that plant experiments be performed on board the space shuttle. To permit the proper execution of most tests, the craft must contain a plant growth chamber which is adequately designed to control those environmental factors which can induce changes in a plant's physiology and morphology. The various needs of, and environmental factors affecting, plants are identified. The permissilbe design, construction and performance limits for a plant-growth chamber are set, and tentative designs were prepared for units which are compatible with both the botanical requirements and the constraints imposed by the space shuttle.
ERIC Educational Resources Information Center
Young, Forrest W.
A model permitting construction of algorithms for the polynomial conjoint analysis of similarities is presented. This model, which is based on concepts used in nonmetric scaling, permits one to obtain the best approximate solution. The concepts used to construct nonmetric scaling algorithms are reviewed. Finally, examples of algorithmic models for…
Federal Register 2010, 2011, 2012, 2013, 2014
2012-08-07
... activities: Construction Buildings........ 236 Heavy and Civil Engineering 237 Construction. EPA does not... permit may not be challenged later in civil or criminal proceedings to enforce these requirements. In...
Box Cello Middle School Science Clubs
NASA Astrophysics Data System (ADS)
Vandegrift, Guy
1998-10-01
The Box Cello is a middle school science club which is attempting to (1) understand the cello and (2) design a low-cost starter instrument. We can support and justify this research by adding a third goal: (3) to help supply local science classes with equipment. My policy of spending one entire day each week away from the university, out in a local school is essential to this project. This schedule also permits me to conduct lessons on optics and music in the schools. And, it permits circulation of tools and equipment. A simple calculation demonstrates the great economy achieved by combining science clubs with academic year school visits. Consider the cost of letting 10,000 students in 10 middle schools each learn about and play with a pair of "upside-down" glasses for one hour. A visit to each school for three consecutive weeks would easily permit such a circulation if only 30 pairs were constructed. Assume rhetorically, that the construction of 30 pairs of glasses were to consume the entire estimated annual budget of $100,000. The cost per student would be only ten dollars! The visits, guest lectures, and equipment loans permit informal networking (including lunch) with math, science and music teachers in 10 schools. For more information, visit the http://www.utep.edu/boxcello/ A>
Tertiary Treatment and Recycling of Wastewater
2015-05-18
of the Worrell design (Figure 2.1) illustrates the modular treatment cells filled with vitrified expanded clay (or similar media) and planted with...General Construction Storm Water permit Sanitary / Storm Drainage Restriction: Absolutely no materials are to be disposed of via the sanitary ...sewer or storm water systems without consulting the Environmental Office. Exception: Water may be discharged down the sanitary sewer when: The
ENGINEERING AND CONSTRUCTING THE HALLAM NUCLEAR POWER FACILITY REACTOR STRUCTURE
DOE Office of Scientific and Technical Information (OSTI.GOV)
Mahlmeister, J E; Haberer, W V; Casey, D F
1960-12-15
The Hallam Nuclear Power Facility reactor structure, including the cavity liner, is described, and the design philosophy and special design requirements which were developed during the preliminary and final engineering phases of the project are explained. The structure was designed for 600 deg F inlet and 1000 deg F outlet operating sodium temperatures and fabricated of austenitic and ferritic stainless steels. Support for the reactor core components and adequate containment for biological safeguards were readily provided even though quite conservative design philosophy was used. The calculated operating characteristics, including heat generation, temperature distributions and stress levels for full-power operation, aremore » summarized. Ship fabrication and field installation experiences are also briefly related. Results of this project have established that the sodium graphite reactor permits practical and economical fabrication and field erection procedures; considerably higher operating design temperatures are believed possible without radical design changes. Also, larger reactor structures can be similarly constructed for higher capacity (300 to 1000 Mwe) nuclear power plants. (auth)« less
40 CFR 60.1090 - What must I do with my revised materials separation plan?
Code of Federal Regulations, 2014 CFR
2014-07-01
... Performance for Small Municipal Waste Combustion Units for Which Construction is Commenced After August 30... Administrator by the date you submit the application for a construction permit under 40 CFR part 51, subpart I, or part 52. (If you are not required to submit an application for a construction permit under 40 CFR...
40 CFR 60.1090 - What must I do with my revised materials separation plan?
Code of Federal Regulations, 2012 CFR
2012-07-01
... Performance for Small Municipal Waste Combustion Units for Which Construction is Commenced After August 30... Administrator by the date you submit the application for a construction permit under 40 CFR part 51, subpart I, or part 52. (If you are not required to submit an application for a construction permit under 40 CFR...
Y-12 Industrial Landfill V. Permit application modifications
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1995-09-01
This report contains the modifications in operations and design to meet the Tennessee Department of Environment and Conversation (TDEC) July 10, 1993, amendments to the regulations for Class 2 landfills. These modifications, though extensive in design and construction cost, are considered minor revisions and should not require a processing fee. Area 1 of ILF V, comprising approximately 20% of the ILF V footprint, was designed and submitted to TDEC prior to the implementation of current regulations. This initial area was constructed with a compacted clay liner and leachate collection system, and became operational in April 1994. The current regulations requiremore » landfills to have a composite liner with leachate collection system and closure cap. Modifications to upgrade Areas 2 and 3 of ILF V to meet the current TDEC requirements are included.« less
47 CFR 1.2003 - Applications affected.
Code of Federal Regulations, 2010 CFR
2010-10-01
... Wireless Telecommunications Bureau Application for Assignment of Authorization and Transfer of Control; FCC... for Consent to Transfer of Control of Corporation Holding Broadcast Station Construction Permit or... License or Transfer of Control of Corporation Holding Radio Broadcast Station Construction Permit or...
NASA Astrophysics Data System (ADS)
Warner, Mark
2014-08-01
In a perfect world, large telescopes would be developed and built in logical, sequential order. First, scientific requirements would be agreed upon, vetted, and fully developed. From these, instrument designers would define their own subsystem requirements and specifications, and then flesh out preliminary designs. This in turn would then allow optic designers to specify lens and mirror requirements, which would permit telescope mounts and drives to be designed. Finally, software and safety systems, enclosures and domes, buildings, foundations, and infrastructures would be specified and developed. Unfortunately, the order of most large telescope projects is the opposite of this sequence. We don't live in a perfect world. Scientists usually don't want to commit to operational requirements until late in the design process, instrument designers frequently change and update their designs due to improving filter and camera technologies, and mount and optics engineers seem to live by the words "more" and "better" throughout their own design processes. Amplifying this is the fact that site construction of buildings and domes are usually the earliest critical path items on the schedule, and are often subject to lengthy permitting and environmental processes. These facility and support items therefore must quickly get underway, often before operational requirements are fully considered. Mirrors and mounts also have very long lead times for fabrication, which in turn necessitates that they are specified and purchased early. All of these factors can result in expensive and time-consuming change orders when requirements are finalized and/or shift late in the process. This paper discusses some of these issues encountered on large, multi-year construction projects. It also presents some techniques and ideas to minimize these effects on schedule and cost. Included is a discussion on the role of Interface Control Documents (ICDs), the importance (and danger) of making big-picture decisions early, and designing flexibility and adaptability into subsystems. In a perfect world, science would be the big dog in the room, wagging the engineering tail. In our non-perfect world, however, it's often the tail that ends up wagging the dog instead.
Permit Regulations for the Construction and/or Operation of Air Emissions Equipment involved in ambient air quality standards & regulations in MS + where to obtain copies of referenced federal regulations
47 CFR 73.3500 - Application and report forms.
Code of Federal Regulations, 2010 CFR
2010-10-01
... Wireless Telecommunications Bureau Application for Assignments of Authorization and Transfers of Control... Station Construction Permit or License. 315 Application for Consent to Transfer of Control of Corporation... Broadcast Station Construction Permit or License or Transfer of Control of Corporation Holding Broadcast...
An Innovation in Building Design
NASA Astrophysics Data System (ADS)
1980-01-01
Collins & Aikman's flat cable permits elimination of ducts and other accommodations traditionally required for building wiring systems, thus gives designers new latitude in planning attractive "open landscape" office layouts. The big factor is that FCC, whose thickness approximates that of two business cards, can be mounted on walls and floors instead of in them, and can be installed beneath a carpet or along a baseboard. Originating from Apollo's command module, its essential sheathing is designed to look like decor rather than plumbing. This could possibly eliminate traditional ducting under floors and elsewhere necessary to accommodate conventional wiring. Construction costs are reduced by 14 percent.
Design of supercritical cascades with high solidity
NASA Technical Reports Server (NTRS)
Sanz, J. M.
1982-01-01
The method of complex characteristics of Garabedian and Korn was successfully used to design shockless cascades with solidities of up to one. A code was developed using this method and a new hodograph transformation of the flow onto an ellipse. This code allows the design of cascades with solidities of up to two and larger turning angles. The equations of potential flow are solved in a complex hodograph like domain by setting a characteristic initial value problem and integrating along suitable paths. The topology that the new mapping introduces permits a simpler construction of these paths of integration.
EPA Approved Iowa Regulations - 40 CFR 52.820(c) Chapter 33 - Special Regulations and Construction Permit Requirements for Major Stationary Sources - Prevention of Significant Deterioration (PSD) of Air Quality
Operator function modeling: An approach to cognitive task analysis in supervisory control systems
NASA Technical Reports Server (NTRS)
Mitchell, Christine M.
1987-01-01
In a study of models of operators in complex, automated space systems, an operator function model (OFM) methodology was extended to represent cognitive as well as manual operator activities. Development continued on a software tool called OFMdraw, which facilitates construction of an OFM by permitting construction of a heterarchic network of nodes and arcs. Emphasis was placed on development of OFMspert, an expert system designed both to model human operation and to assist real human operators. The system uses a blackboard method of problem solving to make an on-line representation of operator intentions, called ACTIN (actions interpreter).
Fused silica mirror development for SIRTF
NASA Technical Reports Server (NTRS)
Barnes, W. P., Jr.
1983-01-01
An advanced design, lightweight, fuse-quartz mirror of sandwich construction was evaluated for optical figure performance at cryogenic temperatures. A low temperature shroud was constructed with an integral mirror mount and interface to a cryostat for use in a vacuum chamber. The mirror was tested to 13 K. Cryogenic distortion of the mirror was measured interferometrically. Separate interferometry of the chamber window during the test permitted subtraction of the small window distortions from the data. Results indicate that the imaging performance of helium cooled, infrared telescopes will be improved using this type of mirror without correction of cryogenic distortion of the primary mirror.
Computer-aided design of antenna structures and components
NASA Technical Reports Server (NTRS)
Levy, R.
1976-01-01
This paper discusses computer-aided design procedures for antenna reflector structures and related components. The primary design aid is a computer program that establishes cross sectional sizes of the structural members by an optimality criterion. Alternative types of deflection-dependent objectives can be selected for designs subject to constraints on structure weight. The computer program has a special-purpose formulation to design structures of the type frequently used for antenna construction. These structures, in common with many in other areas of application, are represented by analytical models that employ only the three translational degrees of freedom at each node. The special-purpose construction of the program, however, permits coding and data management simplifications that provide advantages in problem size and execution speed. Size and speed are essentially governed by the requirements of structural analysis and are relatively unaffected by the added requirements of design. Computation times to execute several design/analysis cycles are comparable to the times required by general-purpose programs for a single analysis cycle. Examples in the paper illustrate effective design improvement for structures with several thousand degrees of freedom and within reasonable computing times.
Code of Federal Regulations, 2010 CFR
2010-01-01
... pursuant to appendix N of part 50 of this chapter for construction permits for nuclear power reactors of... Procedures Applicable to Proceedings for the Issuance of Licenses To Construct and/or Operate Nuclear Power... license applications pursuant to appendix N of 10 CFR parts 50 or 52. 2.401 Section 2.401 Energy NUCLEAR...
Industrial Fuel Gas Demonstration Plant Program: environmental permit compliance plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
Bodamer, Jr., James W.; Bocchino, Robert M.
1979-11-01
This Environmental Permit Compliance Plan is intended to assist the Memphis Light, Gas and Water Division in acquiring the necessary environmental permits for their proposed Industrial Fuel Gas Demonstration Plant in a time frame consistent with the construction schedule. Permits included are those required for installation and/or operation of gaseous, liquid and solid waste sources and disposal areas. Only those permits presently established by final regulations are described. The compliance plan describes procedures for obtaining each permit from identified federal, state and local agencies. The information needed for the permit application is presented, and the stepwise procedure to follow whenmore » filing the permit application is described. Information given in this plan was obtained by reviewing applicable laws and regulations and from telephone conversations with agency personnel on the federal, state and local levels. This Plan also presents a recommended schedule for beginning the work necessary to obtain the required environmental permits in order to begin dredging operations in October, 1980 and construction of the plant in September, 1981. Activity for several key permits should begin as soon as possible.« less
Federal Register 2010, 2011, 2012, 2013, 2014
2010-09-27
... Promulgation of Air Quality Implementation Plans; Michigan; PSD Regulations AGENCY: Environmental Protection... the prevention of significant deterioration (PSD) construction permit program under the Federal Clean... potentially subject to the PSD construction permit program. On July 16, 2010, Michigan submitted revisions...
Hiilangaay Hydroelectric Project – Final Report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Twitchell, Sara; Stimac, Michael; Lang, Lisa
2016-06-01
The Hiilangaay Hydroelectric Project (“Hiilangaay” or the “Project”) is a 5-megawatt hydroelectric resource currently under construction on Prince of Wales Island (POW), Alaska, approximately ten miles east of Hydaburg. The objective of the Project is to interconnect with the existing transmission grid on Prince of Wales Island, increasing the hydroelectric generation capability by 5 MW, eliminating the need for diesel generation, increasing the reliability of the electrical system, and allowing the interconnected portion of the island to have 100 percent renewable energy generation. Pre-construction activities including construction planning, permit coordination and compliance, and final design have made it possible tomore » move forward with construction of the Hiilangaay Project. Despite repeated delays to the schedule, persistence and long-term planning will culminate in the construction of the Project, and make Prince of Wales Island independent of diesel-fueled energy« less
Smith, Amos B.; Kim, Won-Suk
2011-01-01
In conjunction with the construction of a diversity-oriented synthesis library of 10-membered ring “natural product-like” macrolides, the design, synthesis, and validation of a unique class of bifunctional linchpins, uniting benzyne reactivity initiated by type II anion relay chemistry (ARC) has been achieved, permitting access to diverse [2+2], [3+2], and [4+2] cycloadducts. PMID:21245309
30 CFR 933.773 - Requirements for permits and permit processing.
Code of Federal Regulations, 2010 CFR
2010-07-01
...); an approval of dam construction (NCGS 143-215.108), an air pollution control permit (NCGS 143-215.26... in a soil conservation district (NCGS 139-9); and compliance with any county ordinance regarding...
33 CFR 1.01-60 - Delegations for issuance of bridge permits.
Code of Federal Regulations, 2011 CFR
2011-07-01
... bridge permits. 1.01-60 Section 1.01-60 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF... bridge permits. (a) The Commandant delegates to the Deputy Commandant for Operations (CG-DCO), the authority to issue the following permits for the construction, reconstruction, or alteration of bridges...
40 CFR 71.5 - Permit applications.
Code of Federal Regulations, 2010 CFR
2010-07-01
... existing operating permit issued by a State under the State's approved part 70 program and is applying for... date at least 6 months in advance of the date. Where an existing part 70 or 71 permit would prohibit such construction or change in operation, the source must obtain a permit revision before commencing...
33 CFR 1.01-60 - Delegations for issuance of bridge permits.
Code of Federal Regulations, 2010 CFR
2010-07-01
... bridge permits. 1.01-60 Section 1.01-60 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF... bridge permits. (a) The Commandant delegates to the Deputy Commandant for Operations (CG-DCO), the authority to issue the following permits for the construction, reconstruction, or alteration of bridges...
NASA Technical Reports Server (NTRS)
Folta, David C.; Bosanac, Natasha; Cox, Andrew; Howell, Kathleen C.
2016-01-01
Lunar IceCube, a 6U CubeSat, will prospect for water and other volatiles from a low-periapsis, highly inclined elliptical lunar orbit. Injected from Exploration Mission-1, a lunar gravity assisted multi-body transfer trajectory will capture into a lunar science orbit. The constrained departure asymptote and value of trans-lunar energy limit transfer trajectory types that re-encounter the Moon with the necessary energy and flight duration. Purdue University and Goddard Space Flight Center's Adaptive Trajectory Design tool and dynamical system research is applied to uncover cislunar spatial regions permitting viable transfer arcs. Numerically integrated transfer designs applying low-thrust and a design framework are described.
Federal Register 2010, 2011, 2012, 2013, 2014
2011-02-14
... Department of State at such time as the construction authorized by this permit is begun, and again at such time as construction is completed, interrupted for more than ninety days or discontinued. Article 11... Administrative Building Entry and Exit Control Booths Roadways and related Infrastructure, Pathways, Parking Lots...
Documents related to the FNF Construction, Inc. Request for Coverage under the General Air Quality Permit for New or Modified Minor Source Hot Mix Asphalt Plants in Indian Country to be Located near Ganado, Arizona on the Navajo Nation.
Federal Register 2010, 2011, 2012, 2013, 2014
2012-03-29
... Environment Department, Air Quality Bureau, 1190 St. Francis Drive, Santa Fe, New Mexico. FOR FURTHER... Promulgation of Implementation Plans; New Mexico; Construction Permit Fees AGENCY: Environmental Protection... (SIP) for New Mexico submitted by the State of New Mexico on April 11, 2002, and April 25, 2005, which...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-06-01
... permit program for pre- construction review of certain new and modified major stationary sources in... program as required by section 165 of the CAA for certain new and modified major stationary sources... the CAA requires states to adopt a pre-construction permitting program for certain new and modified...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-02-22
... Supervisor, Jacksonville Ecological Services Field Office, Attn: Permit number TE35022A-0, U.S. Fish and... ac of occupied Florida scrub-jay foraging and sheltering habitat incidental to construction of a... construction of a commercial center and the associated infrastructure, and landscaping. The applicant proposes...
47 CFR 74.112 - Supplementary statement with application for construction permit.
Code of Federal Regulations, 2010 CFR
2010-10-01
... construction permit for any experimental broadcast station confirming the applicant's understanding: (a) That... notice or hearing. (e) That any authorization issued pursuant to the application may be cancelled at any time without notice or hearing, and will expire as a matter of law if the station fails to transmit...
The Mesaba Energy Project: Clean Coal Power Initiative, Round 2
DOE Office of Scientific and Technical Information (OSTI.GOV)
Stone, Richard; Gray, Gordon; Evans, Robert
2014-07-31
The Mesaba Energy Project is a nominal 600 MW integrated gasification combine cycle power project located in Northeastern Minnesota. It was selected to receive financial assistance pursuant to code of federal regulations (?CFR?) 10 CFR 600 through a competitive solicitation under Round 2 of the Department of Energy?s Clean Coal Power Initiative, which had two stated goals: (1) to demonstrate advanced coal-based technologies that can be commercialized at electric utility scale, and (2) to accelerate the likelihood of deploying demonstrated technologies for widespread commercial use in the electric power sector. The Project was selected in 2004 to receive a totalmore » of $36 million. The DOE portion that was equally cost shared in Budget Period 1 amounted to about $22.5 million. Budget Period 1 activities focused on the Project Definition Phase and included: project development, preliminary engineering, environmental permitting, regulatory approvals and financing to reach financial close and start of construction. The Project is based on ConocoPhillips? E-Gas? Technology and is designed to be fuel flexible with the ability to process sub-bituminous coal, a blend of sub-bituminous coal and petroleum coke and Illinois # 6 bituminous coal. Major objectives include the establishment of a reference plant design for Integrated Gasification Combined Cycle (?IGCC?) technology featuring advanced full slurry quench, multiple train gasification, integration of the air separation unit, and the demonstration of 90% operational availability and improved thermal efficiency relative to previous demonstration projects. In addition, the Project would demonstrate substantial environmental benefits, as compared with conventional technology, through dramatically lower emissions of sulfur dioxide, nitrogen oxides, volatile organic compounds, carbon monoxide, particulate matter and mercury. Major milestones achieved in support of fulfilling the above goals include obtaining Site, High Voltage Transmission Line Route, and Natural Gas Pipeline Route Permits for a Large Electric Power Generating Plant to be located in Taconite, Minnesota. In addition, major pre-construction permit applications have been filed requesting authorization for the Project to i) appropriate water sufficient to accommodate its worst case needs, ii) operate a major stationary source in compliance with regulations established to protect public health and welfare, and iii) physically alter the geographical setting to accommodate its construction. As of the current date, the Water Appropriation Permits have been obtained.« less
30 CFR 937.773 - Requirements for permits and permit processing.
Code of Federal Regulations, 2011 CFR
2011-07-01
... Facilities Permits, Waste Discharge Permits (ORS 468.900-ORS 468.997), Energy Facility Site Certificates (ORS 469.300-ORS 469.570, ORS 469.990, ORS 469.992) issued by the Energy Facilities Siting Council..., construction and maintenance of dams, dikes or other hydraulic structures or works (ORS 540.350, ORS 540.400...
30 CFR 937.773 - Requirements for permits and permit processing.
Code of Federal Regulations, 2013 CFR
2013-07-01
... Facilities Permits, Waste Discharge Permits (ORS 468.900-ORS 468.997), Energy Facility Site Certificates (ORS 469.300-ORS 469.570, ORS 469.990, ORS 469.992) issued by the Energy Facilities Siting Council..., construction and maintenance of dams, dikes or other hydraulic structures or works (ORS 540.350, ORS 540.400...
30 CFR 937.773 - Requirements for permits and permit processing.
Code of Federal Regulations, 2014 CFR
2014-07-01
... Facilities Permits, Waste Discharge Permits (ORS 468.900-ORS 468.997), Energy Facility Site Certificates (ORS 469.300-ORS 469.570, ORS 469.990, ORS 469.992) issued by the Energy Facilities Siting Council..., construction and maintenance of dams, dikes or other hydraulic structures or works (ORS 540.350, ORS 540.400...
30 CFR 937.773 - Requirements for permits and permit processing.
Code of Federal Regulations, 2010 CFR
2010-07-01
... Facilities Permits, Waste Discharge Permits (ORS 468.900-ORS 468.997), Energy Facility Site Certificates (ORS 469.300-ORS 469.570, ORS 469.990, ORS 469.992) issued by the Energy Facilities Siting Council..., construction and maintenance of dams, dikes or other hydraulic structures or works (ORS 540.350, ORS 540.400...
30 CFR 937.773 - Requirements for permits and permit processing.
Code of Federal Regulations, 2012 CFR
2012-07-01
... Facilities Permits, Waste Discharge Permits (ORS 468.900-ORS 468.997), Energy Facility Site Certificates (ORS 469.300-ORS 469.570, ORS 469.990, ORS 469.992) issued by the Energy Facilities Siting Council..., construction and maintenance of dams, dikes or other hydraulic structures or works (ORS 540.350, ORS 540.400...
40 CFR 52.681 - Permits to construct and tier II operating permits.
Code of Federal Regulations, 2010 CFR
2010-07-01
... (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS Idaho § 52.681 Permits... Permits issued by the Idaho Department of Environmental Quality in accordance with the Federally-approved State of Idaho Rules for Control of Air Pollution in Idaho, incorporated by reference in section 52.670...
The Advanced Technology Solar Telescope: design and early construction
NASA Astrophysics Data System (ADS)
McMullin, Joseph P.; Rimmele, Thomas R.; Keil, Stephen L.; Warner, Mark; Barden, Samuel; Bulau, Scott; Craig, Simon; Goodrich, Bret; Hansen, Eric; Hegwer, Steve; Hubbard, Robert; McBride, William; Shimko, Steve; Wöger, Friedrich; Ditsler, Jennifer
2012-09-01
The National Solar Observatory’s (NSO) Advanced Technology Solar Telescope (ATST) is the first large U.S. solar telescope accessible to the worldwide solar physics community to be constructed in more than 30 years. The 4-meter diameter facility will operate over a broad wavelength range (0.35 to 28 μm ), employing adaptive optics systems to achieve diffraction limited imaging and resolve features approximately 20 km on the Sun; the key observational parameters (collecting area, spatial resolution, spectral coverage, polarization accuracy, low scattered light) enable resolution of the theoretically-predicted, fine-scale magnetic features and their dynamics which modulate the radiative output of the sun and drive the release of magnetic energy from the Sun’s atmosphere in the form of flares and coronal mass ejections. In 2010, the ATST received a significant fraction of its funding for construction. In the subsequent two years, the project has hired staff and opened an office on Maui. A number of large industrial contracts have been placed throughout the world to complete the detailed designs and begin constructing the major telescope subsystems. These contracts have included the site development, AandE designs, mirrors, polishing, optic support assemblies, telescope mount and coudé rotator structures, enclosure, thermal and mechanical systems, and high-level software and controls. In addition, design development work on the instrument suite has undergone significant progress; this has included the completion of preliminary design reviews (PDR) for all five facility instruments. Permitting required for physically starting construction on the mountaintop of Haleakalā, Maui has also progressed. This paper will review the ATST goals and specifications, describe each of the major subsystems under construction, and review the contracts and lessons learned during the contracting and early construction phases. Schedules for site construction, key factory testing of major subsystems, and integration, test and commissioning activities will also be discussed.
Federal Register 2010, 2011, 2012, 2013, 2014
2012-07-19
... Water Act to construct and operate a 399-Megawatt AC (MWAC) solar photovoltaic (PV) energy generating... Environmental Impact Statement for the Proposed Panoche Valley Solar Farm in San Benito County, CA, Corps Permit... Department of the Army permit application to construct a solar photovoltaic energy plant in San Benito County...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-08-10
... of the facilities in the United States. This permit is subject to the following conditions: Article 1... State or the Secretary's delegate. Article 2. The standards for, and the manner of, the construction... performance of their official duties. Article 3. The permittee shall comply with all applicable federal, state...
Approved Request for Coverage under General Air Quality Permit for New or Modified Minor Source Cement Batch Plants in Indian Country for FNF Construction Inc. Window Rock Airport Soil Cement Mixing Plant Project, Beacon Road, Window Rock, Arizona 86515.
Federal Register 2010, 2011, 2012, 2013, 2014
2010-09-23
... technical and marketplace factors that may have a bearing on the value of the construction permits for... auction pace that reasonably balances speed with the bidders' need to study round results and adjust their... and other factors. The Bureaus seek comment on this proposal. Commenters may wish to address the role...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-10-04
... technical and marketplace factors that may have a bearing on the value of the construction permits for... balances speed with the bidders' need to study round results and adjust their bidding strategies. The... number of rounds per day, depending upon bidding activity and other factors. The Bureaus seek comment on...
Structural load control during construction
NASA Technical Reports Server (NTRS)
Mikulas, Martin M., Jr.
1991-01-01
In the absence of gravitational pull, the major design considerations for large space structures are stiffness for controllability, and transient dynamic loadings (as opposed to the traditional static load associated with earth-based structures). Because of the absence of gravitational loading, space structures can be designed to be significantly lighter than their counterparts on Earth. For example, the Space Shuttle manipulator arm is capable of moving and positioning a 60,000 lb payload, yet weighs less than 1,000 lbs. A recent design for the Space Station which had a total weight of about 500,000 lbs. used a primary loadcarrying keel beam which weighed less than 10,000 lbs. For many large space structures designs it is quite common for the load-carrying structure to have a mass fraction on the order of one or two percent of the total spacecraft mass. This significant weight reduction for large space structures is commonly accompanied by very low natural frequencies. These low frequencies cause an unprecedented level of operational complexity for mission applications which require a high level of positioning and control accuracy. This control problem is currently the subject of considerable research directed towards reducing the flexibility problem. In addition, however, the small mass fraction typically results in structures which are quite unforgiving to inadvertent high loadings. In other words, the structures are 'fragile.' In order to deal with the fragility issue CSC developed a load-limiting concept for space truss structures. This concept is aimed at limiting the levels of load which can occur in a large space structure during the construction process as well as during subsequent operations. Currently, the approach for dealing with large loadings is to make the structure larger. The impact this has on construction is significant. The larger structures are more difficult to package in the launch vehicle, and in fact in some instances the concept must be changed from a deployable truss to an erectable truss to permit packaging. The new load-limiting concept is aimed at permitting the use in large space structures of smaller trusses with a high level of strength robustness, in order to simplify the construction process. To date several analyses conducted on the concept have demonstrated its feasibility, and an experiment is currently being designed to demonstrate its operation.
47 CFR 74.788 - Digital construction period.
Code of Federal Regulations, 2010 CFR
2010-10-01
... Translator, and TV Booster Stations § 74.788 Digital construction period. (a) Each original construction permit for the construction of a new digital low power television or television translator station shall...
A library for the fifteenth through the twenty-first centuries.
Cooper, R S
1991-01-01
The University of California, San Francisco (UCSF), began developing a program for a new library in 1977, started the design in 1985, began construction in 1988, and opened the library in September 1990. The primary objectives were to design and build a facility that would house print collections under optimal conditions, allow for ten years' growth, be flexible enough to permit future reconfiguration, support present and future technologies, and provide beautiful spaces in which to study. The planning process is summarized, planning concepts are outlined, and considerations for the electronic library are briefly reviewed. Images PMID:2039900
Federal Register 2010, 2011, 2012, 2013, 2014
2011-07-11
... Cape Wind Associates, LLC (Cape Wind). The OCS permit, which was issued pursuant to regulations, authorizes Cape Wind to construct and operate an offshore renewable wind energy project in federal waters off... Issued to Cape Wind Associates, LLC (EPA Permit Number OCS-R1-01) AGENCY: Environmental Protection Agency...
An examination of the Virginia Department of Transportation's 404 general permit program.
DOT National Transportation Integrated Search
1988-01-01
Several state and federal statutes require that the Virginia Department of Transportation (VDOT) obtain permits for any road construction activity that impacts wetlands and other bodies of water. These "[section] 404 permits" are issued by the u.s. A...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-04-28
... for a construction permit (CP) or combined license (COL) for a nuclear power facility. The ESP process...), the permit holder may reference the permit in an application for a CP or COL. Subsequent Federal...
Vision Guided Intelligent Robot Design And Experiments
NASA Astrophysics Data System (ADS)
Slutzky, G. D.; Hall, E. L.
1988-02-01
The concept of an intelligent robot is an important topic combining sensors, manipulators, and artificial intelligence to design a useful machine. Vision systems, tactile sensors, proximity switches and other sensors provide the elements necessary for simple game playing as well as industrial applications. These sensors permit adaption to a changing environment. The AI techniques permit advanced forms of decision making, adaptive responses, and learning while the manipulator provides the ability to perform various tasks. Computer languages such as LISP and OPS5, have been utilized to achieve expert systems approaches in solving real world problems. The purpose of this paper is to describe several examples of visually guided intelligent robots including both stationary and mobile robots. Demonstrations will be presented of a system for constructing and solving a popular peg game, a robot lawn mower, and a box stacking robot. The experience gained from these and other systems provide insight into what may be realistically expected from the next generation of intelligent machines.
Greiner, Leonard
1984-01-01
A chemical heat pump system is disclosed for use in heating and cooling structures such as residences or commercial buildings. The system is particularly adapted to utilizing solar energy, but also increases the efficiency of other forms of thermal energy when solar energy is not available. When solar energy is not available for relatively short periods of time, the heat storage capacity of the chemical heat pump is utilized to heat the structure, as during nighttime hours. The design also permits home heating from solar energy when the sun is shining. The entire system may be conveniently rooftop located. In order to facilitate installation on existing structures, the absorber and vaporizer portions of the system may each be designed as flat, thin wall, thin pan vessels which materially increase the surface area available for heat transfer. In addition, this thin, flat configuration of the absorber and its thin walled (and therefore relatively flexible) construction permits substantial expansion and contraction of the absorber material during vaporization and absorption without generating voids which would interfere with heat transfer.
Greiner, Leonard
1981-01-01
A chemical heat pump system is disclosed for use in heating and cooling structures such as residences or commercial buildings. The system is particularly adapted to utilizing solar energy, but also increases the efficiency of other forms of thermal energy when solar energy is not available. When solar energy is not available for relatively short periods of time, the heat storage capacity of the chemical heat pump is utilized to heat the structure, as during nighttime hours. The design also permits home heating from solar energy when the sun is shining. The entire system may be conveniently rooftop located. In order to facilitate installation on existing structures, the absorber and vaporizer portions of the system may each be designed as flat, thin wall, thin pan vessels which materially increase the surface area available for heat transfer. In addition, this thin, flat configuration of the absorber and its thin walled (and therefore relatively flexible) construction permits substantial expansion and contraction of the absorber material during vaporization and absorption without generating voids which would interfere with heat transfer.
Greiner, Leonard
1984-01-01
A chemical heat pump system is disclosed for use in heating and cooling structures such as residences or commercial buildings. The system is particularly adapted to utilizing solar energy, but also increases the efficiency of other forms of thermal energy when solar energy is not available. When solar energy is not available for relatively short periods of time, the heat storage capacity of the chemical heat pump is utilized to heat the structure, as during nighttime hours. The design also permits home heating from solar energy when the sun is shining. The entire system may be conveniently rooftop located. In order to facilitate intallation on existing structures, the absorber and vaporizer portions of the system may each be designed as flat, thin wall, thin pan vessels which materially increase the surface area available for heat transfer. In addition, this thin, flat configuration of the absorber and its thin walled (and therefore relatively flexible) construction permits substantial expansion and contraction of the absorber material during vaporization and absorption without generating voids which would interfere with heat transfer.
Greiner, Leonard
1984-01-01
A chemical heat pump system is disclosed for use in heating and cooling structures such as residences or commercial buildings. The system is particularly adapted to utilizing solar energy, but also increases the efficiency of other forms of thermal energy when solar energy is not available. When solar energy is not available for relatively short periods of time, the heat storage capacity of the chemical heat pump is utilized to heat the structure, as during nighttime hours. The design also permits home heating from solar energy when the sun is shining. The entire system may be conveniently rooftop located. In order to faciliate installation on existing structures, the absorber and vaporizer portions of the system may each be designed as flat, thin wall, thin pan vessels which materially increase the surface area available for heat transfer. In addition, this thin, flat configuration of the absorber and its thin walled (and therefore relatively flexible) construction permits substantial expansion and contraction of the absorber material during vaporization and absorption without generating voids which would interfere with heat transfer.
Federal Register 2010, 2011, 2012, 2013, 2014
2010-11-09
...- megawatt (MW), 21-turbine Kaheawa Wind Power I (KWP I) project. Like KWP II, KWP I is owned by First Wind... wind turbine structures. The Hawaiian petrel and Newell's shearwater breed on Maui and feed in the open... the permit include the construction and operation of a new 21-megawatt, 14-turbine wind energy...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-03-19
...) I The Licensees and construction permit (CP) holders\\1\\ identified in Attachment 1 to this Order... identified in Attachment 1 to this Order (i.e., Watts Bar, Unit 2; and Bellefonte, Units 1 and 2) [[Page... boiled dry, resulting in fuel damage.\\2\\ Fukushima demonstrated the confusion and misapplication of...
Environmental Assessment for the Solar Photovoltaic Array, Eglin Air Force Base, Florida
2014-01-24
changes. The Proposed Action also includes construction of the solar PV system , construction of a perimeter fence, and routine site maintenance...Department of Environmental Protection (FDEP) National Pollutant Discharge Elimination System (NPDES) Permit ● Environmental Resource Permit...Management Actions Soils ● Describe slopes, drainage patterns, areas of soil disturbance, areas where stabilization practices will occur, water locations
Microwave power transmitting phased array antenna research project
NASA Technical Reports Server (NTRS)
Dickinson, R. M.
1978-01-01
An initial design study and the development results of an S band RF power transmitting phased array antenna experiment system are presented. The array was to be designed, constructed and instrumented to permit wireless power transmission technology evaluation measurements. The planned measurements were to provide data relative to the achievable performance in the state of the art of flexible surface, retrodirective arrays, as a step in technically evaluating the satellite power system concept for importing to earth, via microwave beams, the nearly continuous solar power available in geosynchronous orbit. Details of the microwave power transmitting phased array design, instrumentation approaches, system block diagrams, and measured component and breadboard characteristics achieved are presented.
33 CFR 115.50 - Application for bridge permits.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 33 Navigation and Navigable Waters 1 2011-07-01 2011-07-01 false Application for bridge permits... BRIDGES BRIDGE LOCATIONS AND CLEARANCES; ADMINISTRATIVE PROCEDURES § 115.50 Application for bridge permits. (a) Application. An application for authorization to construct a bridge across navigable waters of...
Biomass power for rural development. Technical progress report, January 1--March 31, 1998
DOE Office of Scientific and Technical Information (OSTI.GOV)
Neuhauser, E.
Brief progress reports are presented on the following tasks: design packages for retrofits at the Dunkirk Station; fuel supply and site development plans; major equipment guarantees and project risk sharing; power production commitment; power plant site plan, construction and environmental permits; and experimental strategies for system evaluation. The paper then discusses in more detail the following: feedstock development efforts; clone-site testing and genetic studies; and efforts at outreach, extension and technology transfer.
1981-08-01
City were contacted concern- ing Building and Construction permits. No regulations apply since they do not have jurisdiction over RMA property. It may...Division. Mr. Dale advised that their agency’s regulations applied only to permanent pollution emitting sources. Mr. Plog thought that their "fugitive dust...processing, treat- ment, recovery, and disposal of hazardous waste. "Person" means an individual trust, firm, joint stock company , Federal Agency
Cryogenic anti-friction bearing with inner race
NASA Technical Reports Server (NTRS)
Blount, Dale H. (Inventor)
1990-01-01
This invention consists of a bearing designed to operate in a cryogenic environment and which has an inner raceway generally constructed as an annular band fitted by an interference fit to a rotating shaft. A pair of annular tension bands are fitted onto opposed sides of the band and function to firmly clamp the raceway to the shaft. This occurs because the tension bands are constructed of a material which, when cooled to approximately -335 F shrinks more than the raceway and the shaft to which it is fitted. The bands further relax somewhat at room temperature and permit the interference fit between the raceway and the shaft to be sized such that the raceway is not overly stressed.
Mammalian designer cells: Engineering principles and biomedical applications.
Xie, Mingqi; Fussenegger, Martin
2015-07-01
Biotechnology is a widely interdisciplinary field focusing on the use of living cells or organisms to solve established problems in medicine, food production and agriculture. Synthetic biology, the science of engineering complex biological systems that do not exist in nature, continues to provide the biotechnology industry with tools, technologies and intellectual property leading to improved cellular performance. One key aspect of synthetic biology is the engineering of deliberately reprogrammed designer cells whose behavior can be controlled over time and space. This review discusses the most commonly used techniques to engineer mammalian designer cells; while control elements acting on the transcriptional and translational levels of target gene expression determine the kinetic and dynamic profiles, coupling them to a variety of extracellular stimuli permits their remote control with user-defined trigger signals. Designer mammalian cells with novel or improved biological functions not only directly improve the production efficiency during biopharmaceutical manufacturing but also open the door for cell-based treatment strategies in molecular and translational medicine. In the future, the rational combination of multiple sets of designer cells could permit the construction and regulation of higher-order systems with increased complexity, thereby enabling the molecular reprogramming of tissues, organisms or even populations with highest precision. Copyright © 2015 WILEY-VCH Verlag GmbH & Co. KGaA, Weinheim.
Federal Register 2010, 2011, 2012, 2013, 2014
2012-05-08
... Shelf Permits Issued to Shell Offshore, Inc. for the Kulluk Conical Drilling Unit AGENCY: United States... (OCS) permit to construct and Title V air quality operating permit to Shell Offshore, Inc. (``Shell'') for operation of the Kulluk conical drilling unit in the Beaufort Sea off the north coast of Alaska...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-09-09
... Deterioration (PSD) permit application submitted by Avenal Power Center, LLC to authorize construction of the Avenal Energy Project. DATES: The EPA's PSD permit for the Avenal Energy Project became effective and...: The EPA issued a PSD permit on May 27, 2011, to Avenal Power Center, LLC for the Avenal Energy Project...
Design and analysis of composite structures with stress concentrations
NASA Technical Reports Server (NTRS)
Garbo, S. P.
1983-01-01
An overview of an analytic procedure which can be used to provide comprehensive stress and strength analysis of composite structures with stress concentrations is given. The methodology provides designer/analysts with a user-oriented procedure which, within acceptable engineering accuracy, accounts for the effects of a wide range of application design variables. The procedure permits the strength of arbitrary laminate constructions under general bearing/bypass load conditions to be predicted with only unnotched unidirectional strength and stiffness input data required. Included is a brief discussion of the relevancy of this analysis to the design of primary aircraft structure; an overview of the analytic procedure with theory/test correlations; and an example of the use and interaction of this strength analysis relative to the design of high-load transfer bolted composite joints.
Weedon, Christopher Michael; Murphy, Clodagh; Sweaney, Geoff
2017-01-01
Owing to legislation change (which made General Binding Rules effective from 1 January 2015) unless discharge is to specified environmentally sensitive sites, small sewage discharges (SSDs) in England - that is, <2 m 3 d -1 to ground; <5 m 3 d -1 to surface waters - no longer require an Environmental Permit (EP) and need not be registered for exemption, provided discharge to surface waters is preceded by treatment using equipment complying with BS EN 12566. This effectively excludes the use of treatment wetlands, unless covered by an EP, because the cost of certification to EN 12566 for bespoke designs is prohibitive. EPs take up to four months to obtain. Therefore, the new legislation has created a commercial disadvantage for constructed wetlands treating SSDs, compared with mass-produced sewage treatment plants. However, the UK statutory pollution regulators have maintained a dialogue with the Constructed Wetland Association (CWA), with a view to assessing whether treatment of SSD using constructed wetlands might be allowable, without requiring EPs. This paper presents treatment performance data obtained over 15 years, from a variety of full-scale operational treatment wetlands, as supporting evidence for design guidelines, proposed by the CWA to the UK regulators, for the implementation of constructed wetlands continuously passively treating SSD to 20:30:20 mg l -1 BOD/SS/NH4-N under a wide range of loading rates. Relevant experience of UK designers, installers and operators since the early 1990s is included, resulting in recommended physical design criteria and loading rates for compact vertical flow reed beds, presented here as key elements of the draft guidelines.
The sound insulations of studio doors. Part 1: Door blanks
NASA Astrophysics Data System (ADS)
Plumb, G. D.; Clark, R.
The sound insulations of a range of different door blanks were measured. The results were compared with the sound insulations of existing BBC door blanks. The new doors were made from medium density fiberboard (MDF) which is more stable than the blockboard used in existing studio doors. Consequently, they should require less maintenance and adjustment and should have a longer lifespan. The doors had higher sound insulations for their weight than existing designs, which might permit savings in the costs of the surrounding building structures. Overall construction costs of the door blanks themselves are likely to be similar to those of existing designs. A companion Report (BBC RD 1994/15) describes sound insulation measurements made on plant-on door seals. The intention of this work was to simplify the construction of the door frame and the fitting of the seals to reduce costs.
78 FR 46402 - Issuance of a Presidential Permit
Federal Register 2010, 2011, 2012, 2013, 2014
2013-07-31
...: Department of State. ACTION: Notice of Issuance of a Presidential Permit for Vantage Pipeline US LP. SUMMARY: The Department of State issued a Presidential Permit to Vantage Pipeline US LP (``Vantage'') on July 16, 2013, authorizing Vantage to construct, connect, operate, and maintain pipeline facilities at the...
33 CFR 115.50 - Application for bridge permits.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 33 Navigation and Navigable Waters 1 2010-07-01 2010-07-01 false Application for bridge permits... BRIDGES BRIDGE LOCATIONS AND CLEARANCES; ADMINISTRATIVE PROCEDURES § 115.50 Application for bridge permits. (a) Approval of plans. An application for authorization to construct a bridge across navigable waters...
[OR management - Checklists for OR-design for OR-managers - results of a workshop].
Bock, Matthias; Steinmeyer-Bauer, Klaus; Schüpfer, Guido
2014-10-01
The construction of an operating room (OR) suite represents an important intermediate- and long term investment. The planning process starts with the quantitative estimation of the procedures to be carried out which defines the operative capacity for the life time of the facility. This permits the calculation of the number of ORs and the definition of the resources for the recovery room, the intermediate care and intensive care unit.The projectors should integrate the new facility into workflow, workload and logistics of the entire hospital. The simulation flow of patients and accompanying persons and of the routes of the personnel is helpful for this purpose. Separating structures for outpatients from those for inpatients and avoiding de-centralized rooms helps designing an efficient and safe OR suite.The design of the single ORs should be flexible to permit changes or technical innovations during their use period. Mobile equipment is preferable to permanently installed devices. We consider an expanse of at least 45 m(2) for any location adequate for general ORs. The space requirements are elevated for hybrid ORs and rooms dedicated for robotic surgery.The design of the suite should separate the flow of personnel, patients and logistics. Surgical instruments and their logistics should be standardized. Dedicated locations for a simultaneous preparation of the instrumentation tables permit parallel processing. Thus an adequate capacity of preparation rooms and storage rooms is necessary. Dressing rooms, rest rooms, showers and lounges are important for the working conditions and should be planned in an adequate size and number. © Georg Thieme Verlag Stuttgart · New York.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 40 Protection of Environment 1 2013-07-01 2013-07-01 false Permits. 35.925-6 Section 35.925-6 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GRANTS AND OTHER FEDERAL ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works-Clean Water Act § 35.925-6 Permits. That the applicant...
33 CFR 1.01-60 - Delegations for issuance of bridge permits.
Code of Federal Regulations, 2014 CFR
2014-07-01
... authority to issue the following permits for the construction, reconstruction, or alteration of bridges... Presidential permit and approval under the International Bridge Act of 1972 (33 U.S.C. 535). (3) Those that... local government agencies. (5) Those authorized by the Commandant upon the appeal of a district...
33 CFR 1.01-60 - Delegations for issuance of bridge permits.
Code of Federal Regulations, 2013 CFR
2013-07-01
... authority to issue the following permits for the construction, reconstruction, or alteration of bridges... Presidential permit and approval under the International Bridge Act of 1972 (33 U.S.C. 535). (3) Those that... local government agencies. (5) Those authorized by the Commandant upon the appeal of a district...
33 CFR 1.01-60 - Delegations for issuance of bridge permits.
Code of Federal Regulations, 2012 CFR
2012-07-01
... authority to issue the following permits for the construction, reconstruction, or alteration of bridges... Presidential permit and approval under the International Bridge Act of 1972 (33 U.S.C. 535). (3) Those that... local government agencies. (5) Those authorized by the Commandant upon the appeal of a district...
Code of Federal Regulations, 2010 CFR
2010-07-01
... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Permits. 35.925-6 Section 35.925-6 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GRANTS AND OTHER FEDERAL ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works-Clean Water Act § 35.925-6 Permits. That the applicant...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-08-01
... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 [EPA-R05-OAR-2008-0402; FRL-9834-4] Approval and Promulgation of Air Quality Implementation Plans; Wisconsin; Permit Exemption Rule AGENCY: Environmental.... WDNR submitted revisions exempting certain sources of air pollution from construction permit...
40 CFR 69.11 - New exemptions.
Code of Federal Regulations, 2014 CFR
2014-07-01
... significant deterioration (“PSD”) permit prior to construction is granted for the electric generating units... not be operated until a final PSD permit is issued for that unit; (ii) Each electric generating unit shall not be operated until that unit complies with all requirements of its PSD permit, including, if...
40 CFR 69.11 - New exemptions.
Code of Federal Regulations, 2012 CFR
2012-07-01
... significant deterioration (“PSD”) permit prior to construction is granted for the electric generating units... not be operated until a final PSD permit is issued for that unit; (ii) Each electric generating unit shall not be operated until that unit complies with all requirements of its PSD permit, including, if...
40 CFR 69.11 - New exemptions.
Code of Federal Regulations, 2013 CFR
2013-07-01
... significant deterioration (“PSD”) permit prior to construction is granted for the electric generating units... not be operated until a final PSD permit is issued for that unit; (ii) Each electric generating unit shall not be operated until that unit complies with all requirements of its PSD permit, including, if...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-10-19
... Air Act Prevention of Significant Deterioration (PSD) permit for the City of Palmdale (City) for the construction of the Palmdale Hybrid Power Project (PHPP). DATES: EPA Region 9 issued a final PSD permit... decision can obtain them at http://www.epa.gov/eab/ . A copy of the PSD permit is also available at http...
An automatic pellet dispenser for precise control of feeding topography in granivorous birds
Berkhoudt, H.; Van Der Reijden, D.; Heijmans, M.
1987-01-01
Design and construction of an automatic pellet dispenser for granivorous birds are described. The dispenser permits rapid pneumatic delivery of pellets (five pellets per second maximum) to one controlled position and does not interfere with simultaneous electrophysiological recording. In addition, the device continuously indicates presence or absence of a pellet in the delivery position. This automatic dispenser proved very effective in our studies of stereotyped topographies of feeding in granivorous birds, such as pigeons and chickens. PMID:16812503
Vapors-liquid phase separator. [infrared telescope heat sink
NASA Technical Reports Server (NTRS)
Frederking, T. H. K.; Brown, G. S.; Chuang, C.; Kamioka, Y.; Kim, Y. I.; Lee, J. M.; Yuan, S. W. K.
1980-01-01
The use of porous plugs, mostly with in the form of passive devices with constant area were considered as vapor-liquid phase separators for helium 2 storage vessels under reduced gravity. The incorporation of components with variable cross sectional area as a method of flow rate modification was also investigated. A particular device which uses a shutter-type system for area variation was designed and constructed. This system successfully permitted flor rate changes of up to plus or minus 60% from its mean value.
47 CFR 74.788 - Digital construction period.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 47 Telecommunication 4 2011-10-01 2011-10-01 false Digital construction period. 74.788 Section 74... Translator, and TV Booster Stations § 74.788 Digital construction period. (a) Each original construction permit for the construction of a new digital low power television or television translator station shall...
A next generation, pilot-scale continuous sterilization system for fermentation media
Lester, M.; Brix, T.; Wong, D.; Nuechterlein, J.
2006-01-01
A new continuous sterilization system was designed, constructed, started up, and qualified for media sterilization for secondary metabolite cultivations, bioconversions, and enzyme production. An existing Honeywell Total Distributed Control 3000-based control system was extended using redundant High performance Process Manager controllers for 98 I/O (input/output) points. This new equipment was retrofitted into an industrial research fermentation pilot plant, designed and constructed in the early 1980s. Design strategies of this new continuous sterilizer system and the expanded control system are described and compared with the literature (including dairy and bio-waste inactivation applications) and the weaknesses of the prior installation for expected effectiveness. In addition, the reasoning behind selection of some of these improved features has been incorporated. Examples of enhancements adopted include sanitary heat exchanger (HEX) design, incorporation of a “flash” cooling HEX, on-line calculation of Fo and Ro, and use of field I/O modules located near the vessel to permit low-cost addition of new instrumentation. Sterilizer performance also was characterized over the expected range of operating conditions. Differences between design and observed temperature, pressure, and other profiles were quantified and investigated. PMID:16496186
Mach, Jennifer M [Chicago, IL; Zieler, Helge [Del Mar, CA; Jin, RongGuan [Chesterfield, MO; Keith, Kevin [Three Forks, MT; Copenhaver, Gregory P [Chapel Hill, NC; Preuss, Daphne [Chicago, IL
2011-08-02
The present invention provides for the nucleic acid sequences of plant centromeres. This will permit construction of stably inherited recombinant DNA constructs and minichromosomes which can serve as vectors for the construction of transgenic plant and animal cells.
Mach,; Jennifer M. , Zieler; Helge, Jin [Del Mar, CA; RongGuan, Keith [Chesterfield, MO; Kevin, Copenhaver [Three Forks, MT; Gregory P. , Preuss; Daphne, [Chicago, IL
2011-11-22
The present invention provides for the nucleic acid sequences of plant centromeres. This will permit construction of stably inherited recombinant DNA constructs and minichromosomes which can serve as vectors for the construction of transgenic plant and animal cells.
Keith, Kevin; Copenhaver, Gregory; Preuss, Daphne
2006-10-10
The present invention provides for the nucleic acid sequences of plant centromeres. This will permit construction of stably inherited recombinant DNA constructs and minichromosomes which can serve as vectors for the construction of transgenic plant and animal cells.
Mach, Jennifer [Chicago, IL; Zieler, Helge [Chicago, IL; Jin, James [Chicago, IL; Keith, Kevin [Chicago, IL; Copenhaver, Gregory [Chapel Hill, NC; Preuss, Daphne [Chicago, IL
2006-06-26
The present invention provides for the nucleic acid sequences of plant centromeres. This will permit construction of stably inherited recombinant DNA constructs and minichromosomes which can serve as vectors for the construction of transgenic plant and animal cells.
Mach, Jennifer [Chicago, IL; Zieler, Helge [Chicago, IL; Jin, RongGuan [Chicago, IL; Keith, Kevin [Chicago, IL; Copenhaver, Gregory [Chapel Hill, NC; Preuss, Daphne [Chicago, IL
2007-06-05
The present invention provides for the nucleic acid sequences of plant centromeres. This will permit construction of stably inherited recombinant DNA constructs and minichromosomes which can serve as vectors for the construction of transgenic plant and animal cells.
Faucette, L B; Scholl, B; Beighley, R E; Governo, J
2009-01-01
The National Pollutant Discharge Elimination System (NPDES) Phase II requires construction activities to have erosion and sediment control best management practices (BMPs) designed and installed for site storm water management. Although BMPs are specified on storm water pollution prevention plans (SWPPPs) as part of the construction general permit (GP), there is little evidence in the research literature as to how BMPs perform or should be designed. The objectives of this study were to: (i) comparatively evaluate the performance of common construction activity erosion control BMPs under a standardized test method, (ii) evaluate the performance of compost erosion control blanket thickness, (iii) evaluate the performance of compost erosion control blankets (CECBs) on a variety of slope angles, and (iv) determine Universal Soil Loss Equation (USLE) cover management factors (C factors) for these BMPs to assist site designers and engineers. Twenty-three erosion control BMPs were evaluated using American Society of Testing and Materials (ASTM) D-6459, standard test method for determination of ECB performance in protecting hill slopes from rainfall induced erosion, on 4:1 (H:V), 3:1, and 2:1 slopes. Soil loss reduction for treatments exposed to 5 cm of rainfall on a 2:1 slope ranged from-7 to 99%. For rainfall exposure of 10 cm, treatment soil loss reduction ranged from 8 to 99%. The 2.5 and 5 cm CECBs significantly reduced erosion on slopes up to 2:1, while CECBs < 2.5 cm are not recommended on slopes >or= 4:1 when rainfall totals reach 5 cm. Based on the soil loss results, USLE C factors ranged from 0.01 to 0.9. These performance and design criteria should aid site planners and designers in decision-making processes.
NASA Technical Reports Server (NTRS)
Rai, Man Mohan (Inventor); Madavan, Nateri K. (Inventor)
2003-01-01
A method and system for design optimization that incorporates the advantages of both traditional response surface methodology (RSM) and neural networks is disclosed. The present invention employs a unique strategy called parameter-based partitioning of the given design space. In the design procedure, a sequence of composite response surfaces based on both neural networks and polynomial fits is used to traverse the design space to identify an optimal solution. The composite response surface has both the power of neural networks and the economy of low-order polynomials (in terms of the number of simulations needed and the network training requirements). The present invention handles design problems with many more parameters than would be possible using neural networks alone and permits a designer to rapidly perform a variety of trade-off studies before arriving at the final design.
Federal Register 2010, 2011, 2012, 2013, 2014
2012-05-15
... are exempt from preconstruction permitting requirements under Maryland's New Source Review (NSR.... Email: cox[email protected]gov . C. Mail: EPA-R03-OAR-2012-0292, Kathleen Cox, Associate Director, Office of Permits and Air Toxics, Mailcode 3AP10, U.S. Environmental Protection Agency, Region III, 1650...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-06-12
... are exempt from preconstruction permitting requirements under Maryland's New Source Review (NSR.... Email: cox[email protected] . C. Mail: EPA-R03-OAR-2012-0292, Kathleen Cox, Associate Director, Office of Permits and Air Toxics, Mailcode 3AP10, U.S. Environmental Protection Agency, Region III, 1650...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-12-30
... Deterioration (PSD) program to sources of greenhouse gases (GHGs). This action will ensure that a permitting authority--EPA--is available in these states as of January 2, 2011, when PSD becomes applicable to GHG-emitting sources, to issue preconstruction PSD permits and thereby facilitate construction or expansion...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-09-15
... Pollution by Permits for New Construction or Modification AGENCY: Environmental Protection Agency (EPA... in Title 30 of the Texas Administrative Code (TAC), Chapter 116--Control of Air Pollution by Permits... [email protected] . List of Subjects in 40 CFR Part 52 Environmental protection, Air pollution control...
Code of Federal Regulations, 2010 CFR
2010-07-01
... of applications for Department of the Army (DA) permits to authorize the construction of a dike or... require DA permits under section 404 of the Clean Water Act, as amended (33 U.S.C. 1344). Applicants for DA permits under this part should also refer to 33 CFR part 323 to satisfy the requirements of...
Optical Fiber Strain Instrumentation for High Temperature Aerospace Structural Monitoring
NASA Technical Reports Server (NTRS)
Wang, A.
2002-01-01
The objective of the program is the development and laboratory demonstration of sensors based on silica optical fibers for measurement of high temperature strain for aerospace materials evaluations. A complete fiber strain sensor system based on white-light interferometry was designed and implemented. An experiment set-up was constructed to permit testing of strain measurement up to 850 C. The strain is created by bending an alumina cantilever beam to which is the fiber sensor is attached. The strain calibration is provided by the application of known beam deflections. To ensure the high temperature operation capability of the sensor, gold-coated single-mode fiber is used. Moreover, a new method of sensor surface attachment which permits accurate sensor gage length determination is also developed. Excellent results were obtained at temperatures up to 800-850 C.
Building Interactive Simulations in Web Pages without Programming.
Mailen Kootsey, J; McAuley, Grant; Bernal, Julie
2005-01-01
A software system is described for building interactive simulations and other numerical calculations in Web pages. The system is based on a new Java-based software architecture named NumberLinX (NLX) that isolates each function required to build the simulation so that a library of reusable objects could be assembled. The NLX objects are integrated into a commercial Web design program for coding-free page construction. The model description is entered through a wizard-like utility program that also functions as a model editor. The complete system permits very rapid construction of interactive simulations without coding. A wide range of applications are possible with the system beyond interactive calculations, including remote data collection and processing and collaboration over a network.
Oil and Gas Stormwater Permitting Documents
This final rule exempts construction activities at oil and gas sites from the requirement to obtain an NPDES permit for stormwater discharges except in very limited instances. This rule is effective June 12, 2006.
AP1000{sup R} licensing and deployment in the United States
DOE Office of Scientific and Technical Information (OSTI.GOV)
Jordan, R. P.; Russ, P. A.; Filiak, P. P.
2012-07-01
In recent years, both domestic and foreign utilities have turned to the standardized Westinghouse AP1000 plant design in satisfying their near - and long-term - sustainable energy needs. As direct support to these actions, licensing the AP1000 design has played a significant role by providing one of the fundamental bases in clearing regulatory hurdles leading to the start of new plant construction. Within the U.S. alone, Westinghouse AP1000 licensing activities have reached unprecedented milestones with the approvals of both AP1000 Design Certification and Southern Company's combined construction permit and operating license (COL) application directly supporting the construction of two newmore » nuclear plants in Georgia. Further COL application approvals are immediately pending for an additional two AP1000 plants in South Carolina. And, across the U.S. nuclear industry spectrum, there are 10 other COL applications under regulatory review representing some 16 new plants at 10 sites. In total, these actions represent the first wave of new plant licensing under the regulatory approval process since 1978. Fundamental to the Nuclear Regulatory Commission's AP1000 Design Certification is the formal recognition of the AP1000 passive safety design through regulatory acceptance rulemaking. Through recognition and deployment of the AP1000 Design Certification, the utility licensee / operator of this reactor design are now offered an opportunity to use a simplified 'one-step' combined license process, thereby managing substantial back-end construction schedule risk from regulatory and intervention delays. Application of this regulatory philosophy represents both acceptance and encouragement of standardized reactor designs like the AP1000. With the recent AP1000 Design Certification and utility COL acceptances, the fundamental licensing processes of this philosophy have successfully proven the attainment of significant milestones with the next stage licensing actions directed towards deployment. AP1000 Design Certification and COL deployment, and management of the plant construction in accordance with the conditions within these approvals, remain as significant site and corporate responsibilities. These licensing-construction integrated activities must now focus on identifying and resolving 'as-built' departures from the standardized design as assessed against the certified AP1000 technical and licensing basis. Within this paper, significant aspects of the AP1000 U.S. licensing will be discussed, including identifying systems and processes used in ensuring compliance while deploying the standardized design. Critical licensing steps, licensing deployment actions as plant construction progresses and defining the road forward to a successful completion of licensing actions will be addressed. (authors)« less
Carbon Mineralization by Aqueous Precipitation for Beneficial Use of CO2 from Flue Gas
DOE Office of Scientific and Technical Information (OSTI.GOV)
Devenney, Martin; Gilliam, Ryan; Seeker, Randy
2013-08-01
The objective of this project is to demonstrate an innovative process to mineralize CO2 from flue gas directly to reactive carbonates and maximize the value and versatility of its beneficial use products. The program scope includes the design, construction, and testing of a CO2 Conversion to Material Products (CCMP) Pilot Demonstration Plant utilizing CO2 from the flue gas of a power production facility in Moss Landing, CA. This topical report covers Subphase 2a which is the design phase of pilot demonstration subsystems. Materials of construction have been selected and proven in both lab scale and prototype testing to be acceptablemore » for the reagent conditions of interest. The target application for the reactive carbonate material has been selected based upon small-scale feasibility studies and the design of a continuous fiber board production line has been completed. The electrochemical cell architecture and components have been selected based upon both lab scale and prototype testing. The appropriate quality control and diagnostic techniques have been developed and tested along with the required instrumentation and controls. Finally the demonstrate site infrastructure, NEPA categorical exclusion, and permitting is all ready for the construction and installation of the new units and upgrades.« less
Federal Register 2010, 2011, 2012, 2013, 2014
2012-06-12
...-0394, Ms. Kathleen Cox, Associate Director, Office of Permits and Air Toxics, Mailcode 3AP10, U.S... preconstruction permitting requirements under Maryland's New Source Review (NSR) program. In the Final Rules section of this Federal Register, EPA is approving the State's SIP submittal as a direct final rule...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-05-15
...-0292, Ms. Kathleen Cox, Associate Director, Office of Permits and Air Toxics, Mailcode 3AP10, U.S... preconstruction permitting requirements under Maryland's New Source Review (NSR) program. In the Final Rules section of this Federal Register, EPA is approving the State's SIP submittal as a direct final rule...
10 CFR 50.81 - Creditor regulations.
Code of Federal Regulations, 2014 CFR
2014-01-01
... provided by law. (d) As used in this section: (1) License includes any license under this chapter, any construction permit under this part, and any early site permit under part 52 of this chapter, which may be... limited to, a site which is the subject of an early site permit under subpart A of part 52 of this chapter...
10 CFR 50.81 - Creditor regulations.
Code of Federal Regulations, 2010 CFR
2010-01-01
... provided by law. (d) As used in this section: (1) License includes any license under this chapter, any construction permit under this part, and any early site permit under part 52 of this chapter, which may be... limited to, a site which is the subject of an early site permit under subpart A of part 52 of this chapter...
10 CFR 50.81 - Creditor regulations.
Code of Federal Regulations, 2012 CFR
2012-01-01
... provided by law. (d) As used in this section: (1) License includes any license under this chapter, any construction permit under this part, and any early site permit under part 52 of this chapter, which may be... limited to, a site which is the subject of an early site permit under subpart A of part 52 of this chapter...
10 CFR 50.81 - Creditor regulations.
Code of Federal Regulations, 2011 CFR
2011-01-01
... provided by law. (d) As used in this section: (1) License includes any license under this chapter, any construction permit under this part, and any early site permit under part 52 of this chapter, which may be... limited to, a site which is the subject of an early site permit under subpart A of part 52 of this chapter...
10 CFR 50.81 - Creditor regulations.
Code of Federal Regulations, 2013 CFR
2013-01-01
... provided by law. (d) As used in this section: (1) License includes any license under this chapter, any construction permit under this part, and any early site permit under part 52 of this chapter, which may be... limited to, a site which is the subject of an early site permit under subpart A of part 52 of this chapter...
Synthetic Minor NSR Permit: Arrow Pipeline, LLC - Station #7
This page contains the administratively revised synthetic minor permit to construct for the Arrow Pipeline, LLC, Station #7, located within the exterior boundaries of the Fort Berthold Indian Reservation in Dunn County, North Dakota.
Federal Register 2010, 2011, 2012, 2013, 2014
2010-11-05
... required to obtain NPDES permit coverage and performing the following activities: Construction of buildings, including building, developing and general contracting. Heavy and civil 237 engineering construction... Rule Staying Numeric Limitation for the Construction and Development Point Source Category AGENCY...
1989-10-23
817) 824-5606. Reelfoot Lake Water Level believes that the proposed timber EIS No. 890197. Final, USA. UT, Tooele Management Plan. Implementation...2: Incidenial lake erit The potential need for an incidental take permit is discussed in Section 4.4.1, Regional Environment. Comment No. 3...and Crow Indian Tribes. Yellowstone, E02, Lake Catamount ResortAvailability Big Horn and Rosebud Counties, MT, Construction. Special Use Permit
DOE Office of Scientific and Technical Information (OSTI.GOV)
Bhatt, Arpit H; Zhang, Yi Min
A biorefinery, considered a chemical process plant under the Clean Air Act permitting program, could be classified as a major or minor source based on the size of the facility and magnitude of regulated pollutants emitted. Our previous analysis indicates that a biorefinery using fast pyrolysis conversion process to produce finished gasoline and diesel blendstocks with a capacity of processing 2,000 dry metric tons of biomass per day would likely be classified as a major source because several regulated pollutants (such as particulate matter, sulfur dioxide, nitrogen oxide) are estimated to exceed the 100 tons per year (tpy) major sourcemore » threshold, applicable to chemical process plants. Being subject to a major source classification could pose additional challenges associated with obtaining an air permit in a timely manner before the biorefinery can start its construction. Recent developments propose an alternative approach to utilize bio-oil produced via the fast pyrolysis conversion process by shipping it to an existing petroleum refinery, where the raw bio-oil can be blended with petroleum-based feedstocks (e.g., vacuum gas oil) to produce gasoline and diesel blendstocks with renewable content. Without having to hydro-treat raw bio-oil, a biorefinery is likely to reduce its potential-to-emit to below the 100 tpy major source threshold, and therefore expedite its permitting process. We compare the PTE estimates for the two biorefinery designs with and without hydrotreating of bio-oils and examine the air permitting implications on potential air permit classification and discuss the best available control technology requirements for the major source biorefinery utilizing hydrotreating operation. Our analysis is expected to provide useful information to new biofuel project developers to identify opportunities to overcome challenges associated with air permitting.« less
77 FR 68197 - Notice of Final Federal Agency Actions on Proposed Highway in Indiana
Federal Register 2010, 2011, 2012, 2013, 2014
2012-11-15
... emergent, scrub-shrub and forested wetlands. Subject to the permit conditions, INDOT is permitted to... emergent, scrub-shrub, and forested wetlands in constructing these 18 crossings. The actions by the Federal...
40 CFR 60.1705 - What emission limits must I meet? By when?
Code of Federal Regulations, 2010 CFR
2010-07-01
... modification after June 26, 1987, then you must comply with the dioxins/furans and mercury emission limits... construction or operating permit, if a permit modification is required. Final compliance with the dioxins...
43 CFR 2920.9-1 - Construction phase.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 43 Public Lands: Interior 2 2013-10-01 2013-10-01 false Construction phase. 2920.9-1 Section 2920..., Permits and Easements: General Provisions § 2920.9-1 Construction phase. (a) Unless otherwise stated in the land use authorization, construction may proceed immediately upon receipt and acceptance of the...
43 CFR 2920.9-1 - Construction phase.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 43 Public Lands: Interior 2 2012-10-01 2012-10-01 false Construction phase. 2920.9-1 Section 2920..., Permits and Easements: General Provisions § 2920.9-1 Construction phase. (a) Unless otherwise stated in the land use authorization, construction may proceed immediately upon receipt and acceptance of the...
43 CFR 2920.9-1 - Construction phase.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 43 Public Lands: Interior 2 2014-10-01 2014-10-01 false Construction phase. 2920.9-1 Section 2920..., Permits and Easements: General Provisions § 2920.9-1 Construction phase. (a) Unless otherwise stated in the land use authorization, construction may proceed immediately upon receipt and acceptance of the...
NASA Technical Reports Server (NTRS)
Nishida, J. M.
1975-01-01
An analytical and experimental program to demonstrate the technical feasibility of a lightweight, high-efficiency, 1-2 kW cw, permanent magnet focused klystron operating at 12.0 GHz was described. The design is based on use of a samarium-cobalt permanent magnet for focusing of the electron beam and choice of the most optimum parameters for maximum efficiency. A filter-loaded output circuit is used for the required bandwidth. The design incorporates a collector which is demountable from the tube to facilitate multistage depressed collector experiments, permitting replacement with a NASA-designed axisymmetric, electrostatic collector for linear beam microwave tubes. A further requirement is that the focusing field between the last interaction gap and the collector decay in a prescribed manner referred to as adiabatic expansion.
A novel field generator for magnetic stimulation in cell culture experiments.
Vogt, G; Schrefl, A; Mitteregger, R; Falkenhagen, D
1997-06-01
A novel field generator specially designed to examine the influence of low frequency magnetic fields on specific cell material was constructed and characterized. The exposure unit described in this paper consists of a controller unit and three sets of coils. The field generator permits a precious definition of the revelant signal parameters and allows the superposition of alternating current (AC) and direct current (DC) magnetic fields. Critical system parameters were monitored continuously. The three sets of coils, each arranged in the Helmholtz Configuration were characterized. After data processing and visualization the results showed a constant and homogeneous field within the experimental area. The special coil design also allows their use in an incubator.
A magnetically suspended linearly driven cryogenic refrigerator
NASA Technical Reports Server (NTRS)
Stolfi, F.; Goldowsky, M.; Ricciardelli, J.; Shapiro, P.
1983-01-01
This paper described a novel Stirling cycle cryogenic refrigerator which was designed, fabricated and successfully tested at Philips Laboratories. The prominent features of the machine are an electro-magnetic bearing system, a pair of moving magnet linear motors, and clearance seals with a 25 mu m radial gap. The all-metal and ceramic construction eliminates long-term organic contamination of the helium working fluid. The axial positions of the piston and displacer are electronically controlled, permitting independent adjustment of the amplitude of each and their relative phase relationship during operation. A simple passive counterbalance reduces axial vibrations. The design of the refrigerator system components is discussed and a comparison is made between performance estimates and measured results.
Indigenous lunar construction materials
NASA Technical Reports Server (NTRS)
Rogers, Wayne P.; Sture, Stein
1991-01-01
The utilization of local resources for the construction and operation of a lunar base can significantly reduce the cost of transporting materials and supplies from Earth. The feasibility of processing lunar regolith to form construction materials and structural components is investigated. A preliminary review of potential processing methods such as sintering, hot-pressing, liquification, and cast basalt techniques, was completed. The processing method proposed is a variation on the cast basalt technique. It involves liquification of the regolith at 1200-1300 C, casting the liquid into a form, and controlled cooling. While the process temperature is higher than that for sintering or hot-pressing (1000-1100 C), this method is expected to yield a true engineering material with low variability in properties, high strength, and the potential to form large structural components. A scenario for this processing method was integrated with a design for a representative lunar base structure and potential construction techniques. The lunar shelter design is for a modular, segmented, pressurized, hemispherical dome which could serve as habitation and laboratory space. Based on this design, estimates of requirements for power, processing equipment, and construction equipment were made. This proposed combination of material processing method, structural design, and support requirements will help to establish the feasibility of lunar base construction using indigenous materials. Future work will refine the steps of the processing method. Specific areas where more information is needed are: furnace characteristics in vacuum; heat transfer during liquification; viscosity, pouring and forming behavior of molten regolith; design of high temperature forms; heat transfer during cooling; recrystallization of basalt; and refinement of estimates of elastic moduli, compressive and tensile strength, thermal expansion coefficient, thermal conductivity, and heat capacity. The preliminary design of the lunar shelter showed us that joining is a critical technology needed for building a structure from large segments. The problem of joining is important to the design of any structure that is not completely prefabricated. It is especially important when the structure is subjected to tensile loading by an internal pressure. For a lunar shelter constructed from large segments the joints between these large segments must be strong, and they must permit automated construction. With a cast basalt building material which is brittle, there is the additional problem of connecting the joint with the material and avoiding stress concentration that would cause failure. Thus, a well-defined project which we intend to pursue during this coming year is the design of joints for cast basalt structural elements.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Vine, E.
1990-11-01
As part of Lawrence Berkeley Laboratory's (LBL) technical assistance to the Sustainable City Project, compliance and enforcement activities related to local and state building codes for existing and new construction were evaluated in two case studies. The analysis of the City of San Francisco's Residential Energy Conservation Ordinance (RECO) showed that a limited, prescriptive energy conservation ordinance for existing residential construction can be enforced relatively easily with little administrative costs, and that compliance with such ordinances can be quite high. Compliance with the code was facilitated by extensive publicity, an informed public concerned with the cost of energy and knowledgeablemore » about energy efficiency, the threat of punishment (Order of Abatement), the use of private inspectors, and training workshops for City and private inspectors. The analysis of California's Title 24 Standards for new residential and commercial construction showed that enforcement of this type of code for many climate zones is more complex and requires extensive administrative support for education and training of inspectors, architects, engineers, and builders. Under this code, prescriptive and performance approaches for compliance are permitted, resulting in the demand for alternative methods of enforcement: technical assistance, plan review, field inspection, and computer analysis. In contrast to existing to construction, building design and new materials and construction practices are of critical importance in new construction, creating a need for extensive technical assistance and extensive interaction between enforcement personnel and the building community. Compliance problems associated with building design and installation did occur in both residential and nonresidential buildings. 12 refs., 5 tabs.« less
Documents related to Proposed Class II injection well permit modification MI-147-2D-0014
Public notice for proposed modification of permit number MI-147-2D-0014 (St. Clair County, MI). The proposed modification would change the injection zone, the construction, and reduce the injection pressure.
Federal Register 2010, 2011, 2012, 2013, 2014
2012-02-29
... Heavy and Civil Engineering 237 Construction. EPA does not intend the preceding table to be exhaustive... challenged later in civil or criminal proceedings to enforce these requirements. In addition, this permit may...
Development of uniform standards for allowable lane closure : final report, September 2008.
DOT National Transportation Integrated Search
2008-09-01
Procedures for determining allowable lane closure hours to perform maintenance, construction, resurfacing, regional permit and major access permit work on the state highway system were evaluated. The current process involves the collection of traffic...
NPDES Permit for Denver Federal Center Building 52A in Colorado
Under NPDES permit CO-0034860, the GSA is authorized to discharge wastewater from construction dewatering activities at Denver Federal Center Building 52A in Lakewood, Colo., to to the storm drain system entering McIntyre Gulch.
Federal Register 2010, 2011, 2012, 2013, 2014
2012-07-24
.... mail: David L. Hankla, Field Supervisor, Jacksonville Ecological Services Field Office, Attn: Permit... habitat incidental to construction of an expansion to an existing water plant facility. The 6.5-ac project...
The human factor in mining reclamation
Arbogast, Belinda F.; Knepper, Daniel H.; Langer, William H.
2000-01-01
Rapid urbanization of the landscape results in less space available for wildlife habitat, agriculture, and recreation. Mineral resources (especially nonmetallic construction materials) become unrecoverable due to inaccessibility caused by development. This report both describes mine sites with serious problems and draws attention to thoughtful reclamation projects for better future management. It presents information from selected sites in terms of their history, landform, design approach, and visual discernment. Examples from Colorado are included to introduce the broader issue of regions soundly developing mining sites, permitting the best utilization of natural resources, and respecting the landscape.
NASA Technical Reports Server (NTRS)
Lewis, Clayton; Wilde, Nick
1989-01-01
Space construction will require heavy investment in the development of a wide variety of user interfaces for the computer-based tools that will be involved at every stage of construction operations. Using today's technology, user interface development is very expensive for two reasons: (1) specialized and scarce programming skills are required to implement the necessary graphical representations and complex control regimes for high-quality interfaces; (2) iteration on prototypes is required to meet user and task requirements, since these are difficult to anticipate with current (and foreseeable) design knowledge. We are attacking this problem by building a user interface development tool based on extensions to the spreadsheet model of computation. The tool provides high-level support for graphical user interfaces and permits dynamic modification of interfaces, without requiring conventional programming concepts and skills.
Cryogenic anti-friction bearing with reinforced inner race
NASA Technical Reports Server (NTRS)
Blount, Dale H. (Inventor)
1991-01-01
This invention consists of a bearing (26) designed to operate in a cryogenic environment and which has an inner raceway (30) generally constructed as an annular band fitted by an interference fit to a rotating shaft (12). A pair of annular tension bands (32, 34) are fitted onto opposed sides of the band and function to firmly clamp the raceway (30) to the shaft (12). This occurs because the tension bands are constructed of a material which, when cooled to aproximately -385.degree. F., shrinks more than the raceway (30) and the shaft (12) to which it is fitted. The bands further relax somewhat at room temperature and permit the interference fit between the raceway (30) and the shaft (12) to be sized such that the raceway (30) is not overly stessed.
76 FR 12693 - Submission for OMB Review; Comment Request
Federal Register 2010, 2011, 2012, 2013, 2014
2011-03-08
....S. Census Bureau. Title: Survey of Construction--Questionnaire for Building Permit Official. OMB... Construction (SOC). Government agencies and private companies use statistics from SOC to monitor and evaluate the large and dynamic housing construction industry. The SOC-QBPO is an electronic questionnaire...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-04-18
...) The construction, operation and maintenance of the United States facilities shall be in all material... ``Application''). Article 2. (1) The standards for, and the manner of, the construction, operation, and... performance of their official duties. (2) Prior to initiation of construction, the permittee shall obtain the...
30 CFR 780.38 - Support facilities.
Code of Federal Regulations, 2010 CFR
2010-07-01
... COAL MINING AND RECLAMATION OPERATIONS PERMITS AND COAL EXPLORATION SYSTEMS UNDER REGULATORY PROGRAMS SURFACE MINING PERMIT APPLICATIONS-MINIMUM REQUIREMENTS FOR RECLAMATION AND OPERATION PLAN § 780.38... description, plans, and drawings for each support facility to be constructed, used, or maintained within the...
30 CFR 784.30 - Support facilities.
Code of Federal Regulations, 2010 CFR
2010-07-01
... COAL MINING AND RECLAMATION OPERATIONS PERMITS AND COAL EXPLORATION SYSTEMS UNDER REGULATORY PROGRAMS UNDERGROUND MINING PERMIT APPLICATIONS-MINIMUM REQUIREMENTS FOR RECLAMATION AND OPERATION PLAN § 784.30... description, plans, and drawings for each support facility to be constructed, used, or maintained within the...
40 CFR 68.215 - Permit content and air permitting authority or designated agency requirements.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 40 Protection of Environment 15 2010-07-01 2010-07-01 false Permit content and air permitting authority or designated agency requirements. 68.215 Section 68.215 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) CHEMICAL ACCIDENT PREVENTION PROVISIONS Other...
40 CFR 72.30 - Requirement to apply.
Code of Federal Regulations, 2010 CFR
2010-07-01
...) PERMITS REGULATION Acid Rain Permit Applications § 72.30 Requirement to apply. (a) Duty to apply. The designated representative of any source with an affected unit shall submit a complete Acid Rain permit... permit that states its Acid Rain program requirements. (b) Deadlines—(1) Phase 1. (i) The designated...
40 CFR 72.30 - Requirement to apply.
Code of Federal Regulations, 2011 CFR
2011-07-01
...) PERMITS REGULATION Acid Rain Permit Applications § 72.30 Requirement to apply. (a) Duty to apply. The designated representative of any source with an affected unit shall submit a complete Acid Rain permit... permit that states its Acid Rain program requirements. (b) Deadlines—(1) Phase 1. (i) The designated...
40 CFR 72.30 - Requirement to apply.
Code of Federal Regulations, 2012 CFR
2012-07-01
...) PERMITS REGULATION Acid Rain Permit Applications § 72.30 Requirement to apply. (a) Duty to apply. The designated representative of any source with an affected unit shall submit a complete Acid Rain permit... permit that states its Acid Rain program requirements. (b) Deadlines—(1) Phase 1. (i) The designated...
40 CFR 72.30 - Requirement to apply.
Code of Federal Regulations, 2014 CFR
2014-07-01
...) PERMITS REGULATION Acid Rain Permit Applications § 72.30 Requirement to apply. (a) Duty to apply. The designated representative of any source with an affected unit shall submit a complete Acid Rain permit... permit that states its Acid Rain program requirements. (b) Deadlines—(1) Phase 1. (i) The designated...
40 CFR 72.30 - Requirement to apply.
Code of Federal Regulations, 2013 CFR
2013-07-01
...) PERMITS REGULATION Acid Rain Permit Applications § 72.30 Requirement to apply. (a) Duty to apply. The designated representative of any source with an affected unit shall submit a complete Acid Rain permit... permit that states its Acid Rain program requirements. (b) Deadlines—(1) Phase 1. (i) The designated...
40 CFR 35.408 - Award limitations.
Code of Federal Regulations, 2013 CFR
2013-07-01
... management of a substantial portion of the State's construction grants program. The maximum amount of permit... Regional Administrator allows for full funding of the management of the construction grant program under... Award limitations. The Regional Administrator will not award section 205(g) funds: (a) For construction...
40 CFR 35.408 - Award limitations.
Code of Federal Regulations, 2011 CFR
2011-07-01
... management of a substantial portion of the State's construction grants program. The maximum amount of permit... Regional Administrator allows for full funding of the management of the construction grant program under... Award limitations. The Regional Administrator will not award section 205(g) funds: (a) For construction...
40 CFR 35.408 - Award limitations.
Code of Federal Regulations, 2012 CFR
2012-07-01
... management of a substantial portion of the State's construction grants program. The maximum amount of permit... Regional Administrator allows for full funding of the management of the construction grant program under... Award limitations. The Regional Administrator will not award section 205(g) funds: (a) For construction...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Mehrez, Loujaine; Ghanem, Roger; Aitharaju, Venkat
Design of non-crimp fabric (NCF) composites entails major challenges pertaining to (1) the complex fine-scale morphology of the constituents, (2) the manufacturing-produced inconsistency of this morphology spatially, and thus (3) the ability to build reliable, robust, and efficient computational surrogate models to account for this complex nature. Traditional approaches to construct computational surrogate models have been to average over the fluctuations of the material properties at different scale lengths. This fails to account for the fine-scale features and fluctuations in morphology, material properties of the constituents, as well as fine-scale phenomena such as damage and cracks. In addition, it failsmore » to accurately predict the scatter in macroscopic properties, which is vital to the design process and behavior prediction. In this work, funded in part by the Department of Energy, we present an approach for addressing these challenges by relying on polynomial chaos representations of both input parameters and material properties at different scales. Moreover, we emphasize the efficiency and robustness of integrating the polynomial chaos expansion with multiscale tools to perform multiscale assimilation, characterization, propagation, and prediction, all of which are necessary to construct the data-driven surrogate models required to design under the uncertainty of composites. These data-driven constructions provide an accurate map from parameters (and their uncertainties) at all scales and the system-level behavior relevant for design. While this perspective is quite general and applicable to all multiscale systems, NCF composites present a particular hierarchy of scales that permits the efficient implementation of these concepts.« less
Investigating pyrolysis/incineration as a method of resource recovery from solid waste
NASA Technical Reports Server (NTRS)
Robertson, Bobby J.; Lemay, Christopher S.
1993-01-01
Pyrolysis/incineration (P/I) is a physicochemical method for the generation of recoverable resources from solid waste materials such as inedible plant biomass (IPB), paper, plastics, cardboard, etc. P/I permits the collection of numerous gases with a minimal amount of solid residue. Pyrolysis, also known as starved air incineration, is usually conducted at relatively high temperatures (greater than 500 deg C) in the absence of oxygen. Incineration is conducted at lower temperatures in the presence of oxygen. The primary purpose of this study was to design, construct, and test a model P/I. The system design includes safety requirements for temperature and pressure. The objectives of this study were: (1) to design and construct a P/I system for incorporation with the Hybrid Regenerative Water Recovery System; (2) to initiate testing of the P/I system; (3) to collect and analyze P/I system data; (4) to consider test variables; and (5) to determine the feasibility of P/I as an effective method of resource recovery. A P/I system for the recovery of reuseable resources from solid waste materials was designed, constructed, and tested. Since a large amount of inedible plant biomass (IPB) will be generated in a space-based habitat on the lunar surface and Mars, IPB was the primary waste material tested in the system. Analysis of the effluent gases was performed to determine which gases could be used in a life support system.
From orbital debris capture systems through internal combustion engines on Mars
NASA Technical Reports Server (NTRS)
1991-01-01
The investigation and conceptualization of an orbital debris collector was the primary area of design. In addition, an alternate structural design for Space Station Freedom and systems supporting resource utilization at Mars and the moon were studied. Hardware for production of oxygen from simulate Mars atmosphere was modified to permit more reliable operation at low pressures (down to 10 mb). An internal combustion engine was altered to study how Mars atmosphere could be used as a diluent to control combustion temperatures and avoid excess Mars propellant production requirements that would result from either methane-rich or oxygen-rich, methane-oxygen combustion. An elastic loop traction system that could be used for lunar construction vehicles was refined to permit testing. A parabolic heat rejection radiator system was designed and built to determine whether it was capable of increasing heat rejection rates during lunar daytime operation. In addition, an alternate space station truss design, utilizing a pre-integrated concept, was studied and found to reduce estimate extravehicular activity (EVA) time and increase the structural integrity when compared to the original Warren truss concept. An orbital-debris-capturing spacecraft design which could be mated with the Orbital Maneuvering Vehicle was studied. The design identified Soviet C-1B boosters as the best targets of opportunity in Earth orbits between an altitude of 900 km and 1100 km and at an inclination of 82.9 deg. A dual robot pallet, which could be spun to match the tumbling rate of the C-1B booster, was developed as the conceptual design.
14 CFR 437.85 - Allowable design changes; modification of an experimental permit.
Code of Federal Regulations, 2014 CFR
2014-01-01
... Conditions of an Experimental Permit § 437.85 Allowable design changes; modification of an experimental... 14 Aeronautics and Space 4 2014-01-01 2014-01-01 false Allowable design changes; modification of an experimental permit. 437.85 Section 437.85 Aeronautics and Space COMMERCIAL SPACE TRANSPORTATION...
14 CFR 437.85 - Allowable design changes; modification of an experimental permit.
Code of Federal Regulations, 2012 CFR
2012-01-01
... Conditions of an Experimental Permit § 437.85 Allowable design changes; modification of an experimental... 14 Aeronautics and Space 4 2012-01-01 2012-01-01 false Allowable design changes; modification of an experimental permit. 437.85 Section 437.85 Aeronautics and Space COMMERCIAL SPACE TRANSPORTATION...
14 CFR 437.85 - Allowable design changes; modification of an experimental permit.
Code of Federal Regulations, 2011 CFR
2011-01-01
... Conditions of an Experimental Permit § 437.85 Allowable design changes; modification of an experimental... 14 Aeronautics and Space 4 2011-01-01 2011-01-01 false Allowable design changes; modification of an experimental permit. 437.85 Section 437.85 Aeronautics and Space COMMERCIAL SPACE TRANSPORTATION...
14 CFR 437.85 - Allowable design changes; modification of an experimental permit.
Code of Federal Regulations, 2013 CFR
2013-01-01
... Conditions of an Experimental Permit § 437.85 Allowable design changes; modification of an experimental... 14 Aeronautics and Space 4 2013-01-01 2013-01-01 false Allowable design changes; modification of an experimental permit. 437.85 Section 437.85 Aeronautics and Space COMMERCIAL SPACE TRANSPORTATION...
14 CFR 437.85 - Allowable design changes; modification of an experimental permit.
Code of Federal Regulations, 2010 CFR
2010-01-01
... Conditions of an Experimental Permit § 437.85 Allowable design changes; modification of an experimental... 14 Aeronautics and Space 4 2010-01-01 2010-01-01 false Allowable design changes; modification of an experimental permit. 437.85 Section 437.85 Aeronautics and Space COMMERCIAL SPACE TRANSPORTATION...
40 CFR 270.13 - Contents of part A of the permit application.
Code of Federal Regulations, 2011 CFR
2011-07-01
... WASTES (CONTINUED) EPA ADMINISTERED PERMIT PROGRAMS: THE HAZARDOUS WASTE PERMIT PROGRAM Permit..., and disposing of hazardous waste, and the design capacity of these items. (j) A specification of the hazardous wastes listed or designated under 40 CFR part 261 to be treated, stored, or disposed of at the...
40 CFR 270.13 - Contents of part A of the permit application.
Code of Federal Regulations, 2010 CFR
2010-07-01
... WASTES (CONTINUED) EPA ADMINISTERED PERMIT PROGRAMS: THE HAZARDOUS WASTE PERMIT PROGRAM Permit..., and disposing of hazardous waste, and the design capacity of these items. (j) A specification of the hazardous wastes listed or designated under 40 CFR part 261 to be treated, stored, or disposed of at the...
NASA Technical Reports Server (NTRS)
Butler, R.; Williams, F. W.
1992-01-01
A computer program for obtaining the optimum (least mass) dimensions of the kind of prismatic assemblies of laminated, composite plates which occur in advanced aerospace construction is described. Rigorous buckling analysis (derived from exact member theory) and a tailored design procedure are used to produce designs which satisfy buckling and material strength constraints and configurational requirements. Analysis is two to three orders of magnitude quicker than FEM, keeps track of all the governing modes of failure and is efficiently adapted to give sensitivities and to maintain feasibility. Tailoring encourages convergence in fewer sizing cycles than competing programs and permits start designs which are a long way from feasible and/or optimum. Comparisons with its predecessor, PASCO, show that the program is more likely to produce an optimum, will do so more quickly in some cases, and remains accurate for a wider range of problems.
Minor New Source Review Permit Application: Fluidic, Inc.
Federal Minor New Source Review New Construction Application for proposed construction of new equipment at an existing source at Fluidic's facility located at 8425 N. 9th Street, Suite #4, Scottsdale, Arizona 48258.
Majestic C Team, LLC - Clean Water Act Public Notice
The EPA is providing notice of a proposed Administrative Penalty Assessment against Majestic C Team, LLC., which owns a residential construction site located at 168th St and State St in Omaha, NE for alleged violations of its NPDES permit (permit No. NER11
Code of Federal Regulations, 2010 CFR
2010-07-01
.... (h) Permit. The term “permit” means the license permitting construction of bridges and approaches... subchapter. (i) Secretary. The term “Secretary” means the Secretary of Homeland Security or any person to... term “bridge” means a structure erected across navigable waters of the United States, and includes...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-06-14
... of 10 CFR Part 52 separate from the filing of an application for a construction permit (CP) or... reference the permit in a CP or COL application. The NRC staff has determined that Exelon has submitted...
NASA Astrophysics Data System (ADS)
Ballarotta, M.; Brodeau, L.; Brandefelt, J.; Lundberg, P.; Döös, K.
2013-01-01
Most state-of-the-art climate models include a coarsely resolved oceanic component, which has difficulties in capturing detailed dynamics, and therefore eddy-permitting/eddy-resolving simulations have been developed to reproduce the observed World Ocean. In this study, an eddy-permitting numerical experiment is conducted to simulate the global ocean state for a period of the Last Glacial Maximum (LGM, ~ 26 500 to 19 000 yr ago) and to investigate the improvements due to taking into account these higher spatial scales. The ocean general circulation model is forced by a 49-yr sample of LGM atmospheric fields constructed from a quasi-equilibrated climate-model simulation. The initial state and the bottom boundary condition conform to the Paleoclimate Modelling Intercomparison Project (PMIP) recommendations. Before evaluating the model efficiency in representing the paleo-proxy reconstruction of the surface state, the LGM experiment is in this first part of the investigation, compared with a present-day eddy-permitting hindcast simulation as well as with the available PMIP results. It is shown that the LGM eddy-permitting simulation is consistent with the quasi-equilibrated climate-model simulation, but large discrepancies are found with the PMIP model analyses, probably due to the different equilibration states. The strongest meridional gradients of the sea-surface temperature are located near 40° N and S, this due to particularly large North-Atlantic and Southern-Ocean sea-ice covers. These also modify the locations of the convection sites (where deep-water forms) and most of the LGM Conveyor Belt circulation consequently takes place in a thinner layer than today. Despite some discrepancies with other LGM simulations, a glacial state is captured and the eddy-permitting simulation undertaken here yielded a useful set of data for comparisons with paleo-proxy reconstructions.
Christen, Matthias; Del Medico, Luca; Christen, Heinz; Christen, Beat
2017-01-01
Recent advances in lower-cost DNA synthesis techniques have enabled new innovations in the field of synthetic biology. Still, efficient design and higher-order assembly of genome-scale DNA constructs remains a labor-intensive process. Given the complexity, computer assisted design tools that fragment large DNA sequences into fabricable DNA blocks are needed to pave the way towards streamlined assembly of biological systems. Here, we present the Genome Partitioner software implemented as a web-based interface that permits multi-level partitioning of genome-scale DNA designs. Without the need for specialized computing skills, biologists can submit their DNA designs to a fully automated pipeline that generates the optimal retrosynthetic route for higher-order DNA assembly. To test the algorithm, we partitioned a 783 kb Caulobacter crescentus genome design. We validated the partitioning strategy by assembling a 20 kb test segment encompassing a difficult to synthesize DNA sequence. Successful assembly from 1 kb subblocks into the 20 kb segment highlights the effectiveness of the Genome Partitioner for reducing synthesis costs and timelines for higher-order DNA assembly. The Genome Partitioner is broadly applicable to translate DNA designs into ready to order sequences that can be assembled with standardized protocols, thus offering new opportunities to harness the diversity of microbial genomes for synthetic biology applications. The Genome Partitioner web tool can be accessed at https://christenlab.ethz.ch/GenomePartitioner.
Construction Activities Prior to Issuance of a PSD Permit with Respect to Begin Actual Construction
This document may be of assistance in applying the New Source Review (NSR) air permitting regulations including the Prevention of Significant Deterioration (PSD) requirements. This document is part of the NSR Policy and Guidance Database. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.
Fixed-Order Mixed Norm Designs for Building Vibration Control
NASA Technical Reports Server (NTRS)
Whorton, Mark S.; Calise, Anthony J.
2000-01-01
This study investigates the use of H2, mu-synthesis, and mixed H2/mu methods to construct full order controllers and optimized controllers of fixed dimensions. The benchmark problem definition is first extended to include uncertainty within the controller bandwidth in the form of parametric uncertainty representative of uncertainty in the natural frequencies of the design model. The sensitivity of H2 design to unmodeled dynamics and parametric uncertainty is evaluated for a range of controller levels of authority. Next, mu-synthesis methods are applied to design full order compensators that are robust to both unmodeled dynamics and to parametric uncertainty. Finally, a set of mixed H2/mu compensators are designed which are optimized for a fixed compensator dimension. These mixed norm designs recover the H2 design performance levels while providing the same levels of robust stability as the mu designs. It is shown that designing with the mixed norm approach permits higher levels of controller authority for which the H2 designs are destabilizing. The benchmark problem is that of an active tendon system. The controller designs are all based on the use of acceleration feedback.
40 CFR 70.5 - Permit applications.
Code of Federal Regulations, 2010 CFR
2010-07-01
... establish. Where an existing part 70 permit would prohibit such construction or change in operation, the... information only if it is related to the proposed change. Information required under paragraph (c) of this... part shall state that, based on information and belief formed after reasonable inquiry, the statements...
75 FR 35516 - Pipeline Safety: Request for Special Permit
Federal Register 2010, 2011, 2012, 2013, 2014
2010-06-22
... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration [Docket No. PHMSA-2010-0147] Pipeline Safety: Request for Special Permit AGENCY: Pipeline and Hazardous Materials... with the Class 1 location portion of a 7.4 mile natural gas pipeline to be constructed in Alaska. This...
36 CFR 223.37 - Revegetation of temporary roads.
Code of Federal Regulations, 2010 CFR
2010-07-01
... roads. 223.37 Section 223.37 Parks, Forests, and Public Property FOREST SERVICE, DEPARTMENT OF... Provisions § 223.37 Revegetation of temporary roads. Timber sale contracts, permits and other documents... roads constructed or used thereunder so as to permit the reestablishment by artificial or natural means...
Failure analysis of composite laminates including biaxial compression
NASA Technical Reports Server (NTRS)
Tennyson, R. C.; Elliott, W. G.
1983-01-01
This report describes a continued effort on the development and application of the tensor polynomial failure criterion for composite laminate analysis. In particular, emphasis is given to the design, construction and testing of a cross-beam laminate configuration to obtain "pure' biaxial compression failure. The purpose of this test case was to provide to permit "closure' of the cubic form of the failure surface in the 1-2 compression-compression quadrant. This resulted in a revised set of interaction strength parameters and the construction of a failure surface which can be used with confidence for strength predictions, assuming a plane stress state exists. Furthermore, the problem of complex conjugate roots which can occur in some failure regions is addressed and an "engineering' interpretation is provided. Results are presented illustrating this behavior and the methodology for overcoming this problem is discussed.
Condensation nuclei measurement in the stratosphere for the NASA ACE program
NASA Astrophysics Data System (ADS)
Wilson, James Charles
1994-11-01
A condensation nucleus counter which operated at stratospheric pressures was developed, designed, and constructed. It was calibrated in the laboratory. Its response as a function of particle size and concentration was reported. This was the first time that the response of such an instrument was verified in the laboratory. An inlet was constructed which provided near isokinetic sampling. The resulting instrument, the U-2 CNC, was deployed on NASA U-2 aircraft in the study of the climatic effects of aerosol. These studies occurred in March, April, May, July, November, and December of 1992 and in April, May, June, and December of 1983. The U-2 CNC was used in the study of the aerosol cloud resulting from the eruption of El Chichon. It permitted the observation of new particle formation in the stratosphere.
Condensation nuclei measurement in the stratosphere for the NASA ACE program
NASA Technical Reports Server (NTRS)
Wilson, James Charles
1994-01-01
A condensation nucleus counter which operated at stratospheric pressures was developed, designed, and constructed. It was calibrated in the laboratory. Its response as a function of particle size and concentration was reported. This was the first time that the response of such an instrument was verified in the laboratory. An inlet was constructed which provided near isokinetic sampling. The resulting instrument, the U-2 CNC, was deployed on NASA U-2 aircraft in the study of the climatic effects of aerosol. These studies occurred in March, April, May, July, November, and December of 1992 and in April, May, June, and December of 1983. The U-2 CNC was used in the study of the aerosol cloud resulting from the eruption of El Chichon. It permitted the observation of new particle formation in the stratosphere.
Development and Performance of the Alaska Transportable Array Posthole Broadband Seismic Station
NASA Astrophysics Data System (ADS)
Aderhold, K.; Enders, M.; Miner, J.; Bierma, R. M.; Bloomquist, D.; Theis, J.; Busby, R. W.
2017-12-01
The final stations of the Alaska Transportable Array (ATA) will be constructed in 2017, completing the full footprint of 280 new and existing broadband seismic stations stretching across 19 degrees of latitude from western Alaska to western Canada. Through significant effort in planning, site reconnaissance, permitting and the considerable and concerted effort of field crews, the IRIS Alaska TA team is on schedule to successfully complete the construction of 194 new stations and upgrades at 28 existing stations over four field seasons. The station design and installation method was developed over the course of several years, leveraging the experience of the L48 TA deployments and existing network operators in Alaska as well as incorporating newly engineered components and procedures. A purpose-built lightweight drill was designed and fabricated to facilitate the construction of shallow boreholes to incorporate newly available posthole seismometers. This allowed for the development of a streamlined system of procedures to manufacture uniform seismic stations with minimal crew and minimal time required at each station location. A new station can typically be constructed in a single day with a four-person field crew. The ATA utilizes a hammer-drilled, cased posthole emplacement method adapted to the remote and harsh working environment of Alaska. The same emplacement design is implemented in all ground conditions to preserve uniformity across the array and eliminate the need for specialized mechanical equipment. All components for station construction are ideally suited for transport via helicopter, and can be adapted to utilize more traditional methods of transportation when available. This emplacement design delivers high quality data when embedded in bedrock or permafrost, reaching the low noise levels of benchmark permanent global broadband stations especially at long periods over 70 seconds. The TA will operate the network of real-time stations through at least 2019, with service trips planned on a "as needed" basis to continue providing greater than 95% data return.
Searching for possible hidden chambers in the Pyramid of the Sun
NASA Astrophysics Data System (ADS)
Alfaro, R.; Belmont, E.; Grabski, V.; Manzanilla, L.; Martinez-Davalos, A.; Menchaca-Rocha, A.; Moreno, M.; Sandoval, A.
The Pyramid of the Sun, at Teotihuacan, Mexico, is being searched for possible hidden chambers, using a muon tracking technique inspired in the experiment carried out by Luis Alvarez over 30 years ago at the Chephren Pyramid, in Giza. A fortunate similarity between this monument and the Pyramid of the Sun is a tunnel, running 8 m below the base and ending close to the symmetry axis, which permits the use muon attenuation measurements. A brief account of the project, including planning, detector design, construction and simulations, as well as the current status of the project is presented
Secondary Waste Form Development and Optimization—Cast Stone
DOE Office of Scientific and Technical Information (OSTI.GOV)
Sundaram, S. K.; Parker, Kent E.; Valenta, Michelle M.
2011-07-14
Washington River Protection Services is considering the design and construction of a Solidification Treatment Unit (STU) for the Effluent Treatment Facility (ETF) at Hanford. The ETF is a Resource Conservation and Recovery Act-permitted, multi-waste, treatment and storage unit and can accept dangerous, low-level, and mixed wastewaters for treatment. The STU needs to be operational by 2018 to receive secondary liquid wastes generated during operation of the Hanford Tank Waste Treatment and Immobilization Plant (WTP). The STU to ETF will provide the additional capacity needed for ETF to process the increased volume of secondary wastes expected to be produced by WTP.
29 CFR 1926.152 - Flammable and combustible liquids.
Code of Federal Regulations, 2010 CFR
2010-07-01
... access way to permit approach of fire control apparatus. (3) The storage area shall be graded in a manner... to permit approach of fire control apparatus. (5) Storage areas shall be kept free of weeds, debris... wooden storage cabinets shall be constructed in the following manner, or equivalent: The bottom, sides...
Code of Federal Regulations, 2014 CFR
2014-01-01
..., combined licenses, and manufacturing licenses. 50.55 Section 50.55 Energy NUCLEAR REGULATORY COMMISSION... experimental nature of the facility or fire, flood, explosion, strike, sabotage, domestic violence, enemy... submitted to the Document Control Desk, U.S. Nuclear Regulatory Commission, by an appropriate method listed...
Code of Federal Regulations, 2012 CFR
2012-01-01
..., combined licenses, and manufacturing licenses. 50.55 Section 50.55 Energy NUCLEAR REGULATORY COMMISSION... experimental nature of the facility or fire, flood, explosion, strike, sabotage, domestic violence, enemy... submitted to the Document Control Desk, U.S. Nuclear Regulatory Commission, by an appropriate method listed...
Code of Federal Regulations, 2013 CFR
2013-01-01
..., combined licenses, and manufacturing licenses. 50.55 Section 50.55 Energy NUCLEAR REGULATORY COMMISSION... experimental nature of the facility or fire, flood, explosion, strike, sabotage, domestic violence, enemy... submitted to the Document Control Desk, U.S. Nuclear Regulatory Commission, by an appropriate method listed...
75 FR 4839 - Endangered and Threatened Wildlife and Plants; Permit, St. Lucie County, FL
Federal Register 2010, 2011, 2012, 2013, 2014
2010-01-29
...] Endangered and Threatened Wildlife and Plants; Permit, St. Lucie County, FL AGENCY: Fish and Wildlife Service...-jay) breeding, feeding, and sheltering habitat incidental to lot preparation for the construction of a...)) of Florida scrub-jay breeding, feeding and sheltering habitat incidental to land preparation for...
75 FR 69990 - Application for Presidential Permit; Northern Pass Transmission LLC
Federal Register 2010, 2011, 2012, 2013, 2014
2010-11-16
... constructed in Franklin, New Hampshire. At the Franklin converter terminal the electric energy would be... marketplace, DOE has consistently expressed its policy that cross-border trade in electric energy should be... DEPARTMENT OF ENERGY [OE Docket No. PP-371] Application for Presidential Permit; Northern Pass...
29 CFR 1926.152 - Flammable and combustible liquids.
Code of Federal Regulations, 2011 CFR
2011-07-01
... access way to permit approach of fire control apparatus. (3) The storage area shall be graded in a manner... to permit approach of fire control apparatus. (5) Storage areas shall be kept free of weeds, debris... wooden storage cabinets shall be constructed in the following manner, or equivalent: The bottom, sides...
Lapaige, Véronique
2009-01-01
The current phase of globalization represents a "double-edged sword" challenge facing public health practitioners and health policy makers. The first "edge" throws light on two constructs in the field of public health: global health (formerly international health) and globalized public health. The second "edge" is that of global governance, and raises the question, "how can we construct public health regulations that adequately respond to both global and local complexities related to the two constructs mentioned earlier (global health and globalized public health)?" The two constructs call for the development of norms that will assure sustained population-wide health improvement and these two constructs have their own conceptual tools and theoretical models that permit a better understanding of them. In this paper, we introduce the "globalized public health" construct and we present an interactive comprehensive framework for critically analyzing contemporary globalization's influences on the field of public health. "Globalized public health", simultaneously a theoretical model and a conceptual framework, concerns the transformation of the field of public health in the sociohistorical context of globalization. The model is the fruit of an original theoretical research study conducted from 2005 to 2008 ("contextualized research," Gibbons' Mode II of knowledge production), founded on a QUAL-quant sequential mixed-method design. This research also reflects our political and ideological position, fuelled with aspirations of social democracy and cosmopolitical values. It is profoundly anchored in the pragmatic approach to globalization, looking to "reconcile" the market and equity. The model offers several features to users: (1) it is transdisciplinary; (2) it is interactive (CD-ROM); (3) it is nonlinear (nonlinear interrelations between the contextual globalization and the field of public health); (4) it is synchronic/diachronic (a double-crossed perspective permits analysis of global social change, the emergence of global agency and the transmutation of the field of public health, in the full complexity of their nonlinear interaction); (5) it offers five characteristics as an auto-eco-organized system of social interactions, or dynamic, nonlinear sociohistorical system. The model features a visual interface (five interrelated figures), a structure of 30 "integrator concepts" that integrates 114 other element-parts via 1,300 hypertext links. The model is both a knowledge translation tool and an interactive heuristic guide designed for practitioners and researchers in public health/community health/population health, as well as for decision-makers at all levels.
Lapaige, Véronique
2009-01-01
The current phase of globalization represents a “double-edged sword” challenge facing public health practitioners and health policy makers. The first “edge” throws light on two constructs in the field of public health: global health (formerly international health) and globalized public health. The second “edge” is that of global governance, and raises the question, “how can we construct public health regulations that adequately respond to both global and local complexities related to the two constructs mentioned earlier (global health and globalized public health)?” The two constructs call for the development of norms that will assure sustained population-wide health improvement and these two constructs have their own conceptual tools and theoretical models that permit a better understanding of them. In this paper, we introduce the “globalized public health” construct and we present an interactive comprehensive framework for critically analyzing contemporary globalization’s influences on the field of public health. “Globalized public health”, simultaneously a theoretical model and a conceptual framework, concerns the transformation of the field of public health in the sociohistorical context of globalization. The model is the fruit of an original theoretical research study conducted from 2005 to 2008 (“contextualized research,” Gibbons’ Mode II of knowledge production), founded on a QUAL-quant sequential mixed-method design. This research also reflects our political and ideological position, fuelled with aspirations of social democracy and cosmopolitical values. It is profoundly anchored in the pragmatic approach to globalization, looking to “reconcile” the market and equity. The model offers several features to users: (1) it is transdisciplinary; (2) it is interactive (CD-ROM); (3) it is nonlinear (nonlinear interrelations between the contextual globalization and the field of public health); (4) it is synchronic/diachronic (a double-crossed perspective permits analysis of global social change, the emergence of global agency and the transmutation of the field of public health, in the full complexity of their nonlinear interaction); (5) it offers five characteristics as an auto-eco-organized system of social interactions, or dynamic, nonlinear sociohistorical system. The model features a visual interface (five interrelated figures), a structure of 30 “integrator concepts” that integrates 114 other element-parts via 1,300 hypertext links. The model is both a knowledge translation tool and an interactive heuristic guide designed for practitioners and researchers in public health/community health/population health, as well as for decision-makers at all levels. PMID:22312210
Long-term Stabilization of Disturbed Slopes Resulting from Construction Operations
DOT National Transportation Integrated Search
2018-01-01
Highway construction disturbs soil, which must be stabilized to prevent migration of soil particles into water bodies. Stabilization is enforced by law, regulation, and a permit system. Stabilization is most efficiently attained by reestablishment of...
Settlement Yields Protection for Deerfield River from Highway Project Runoff
Both parties involved in a road and bridge construction project in Deerfield, Mass. have agreed to pay a total penalty of $21,600 to resolve claims by EPA that they violated their construction permit...
Hayashi, Motohiro; Chernov, Mikhail F; Tamura, Noriko; Yomo, Shoji; Tamura, Manabu; Horiba, Ayako; Izawa, Masahiro; Muragaki, Yoshihiro; Iseki, Hiroshi; Okada, Yoshikazu; Ivanov, Pavel; Régis, Jean; Takakura, Kintomo
2013-01-01
Gamma Knife radiosurgery (GKS) is currently performed with 0.1 mm preciseness, which can be designated microradiosurgery. It requires advanced methods for visualizing the target, which can be effectively attained by a neuroimaging protocol based on plain and gadolinium-enhanced constructive interference in steady state (CISS) images. Since 2003, the following thin-sliced images are routinely obtained before GKS of skull base lesions in our practice: axial CISS, gadolinium-enhanced axial CISS, gadolinium-enhanced axial modified time-of-flight (TOF), and axial computed tomography (CT). Fusion of "bone window" CT and magnetic resonance imaging (MRI), and detailed three-dimensional (3D) delineation of the anatomical structures are performed with the Leksell GammaPlan (Elekta Instruments AB). Recently, a similar technique has been also applied to evaluate neuroanatomy before open microsurgical procedures. Plain CISS images permit clear visualization of the cranial nerves in the subarachnoid space. Gadolinium-enhanced CISS images make the tumor "lucid" but do not affect the signal intensity of the cranial nerves, so they can be clearly delineated in the vicinity to the lesion. Gadolinium-enhanced TOF images are useful for 3D evaluation of the interrelations between the neoplasm and adjacent vessels. Fusion of "bone window" CT and MRI scans permits simultaneous assessment of both soft tissue and bone structures and allows 3D estimation and correction of MRI distortion artifacts. Detailed understanding of the neuroanatomy based on application of the advanced neuroimaging protocol permits performance of highly conformal and selective radiosurgical treatment. It also allows precise planning of the microsurgical procedures for skull base tumors.
47 CFR 90.767 - Construction and implementation of EA and Regional licenses.
Code of Federal Regulations, 2010 CFR
2010-10-01
...) An EA or Regional licensee must construct a sufficient number of base stations (i.e., base stations... all of their base stations or fixed stations. [69 FR 75172, Dec. 15, 2004] ... constructed stations. (d) EA and Regional licensees will not be permitted to count the resale of the services...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-04-20
... Presidential permit for the construction, operation, and maintenance of pipeline facilities at the border of... referred to in Executive Order 13337, as amended, for the construction, connection, operation, or... environmental effects of the construction and operation of the United States portion of the Keystone XL Pipeline...
Constructing temporary sampling platforms for hydrologic studies
Manuel H. Martinez; Sandra E. Ryan
2000-01-01
This paper presents instructions for constructing platforms that span the width of stream channels to accommodate the measurement of hydrologic parameters over a wide range of discharges. The platforms provide a stable, safe, noninvasive, easily constructed, and relatively inexpensive means for permitting data collection without wading in the flow. We have used the...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-02-06
... jurisdiction did not already perform its own inspections for new construction, and issue building permits and... expected to be minimal. The increased quality of construction materials and the standardization of building... governments that have adopted building codes to regulate and standardize the construction of residential and...
40 CFR 265.19 - Construction quality assurance program.
Code of Federal Regulations, 2013 CFR
2013-07-01
... conductivity requirements must be verified by using in-situ testing on the constructed test fill. The test fill... specifications in the permit. The program must be developed and implemented under the direction of a CQA officer... applicable units, and a description of how they will be constructed. (2) Identification of key personnel in...
40 CFR 265.19 - Construction quality assurance program.
Code of Federal Regulations, 2010 CFR
2010-07-01
... conductivity requirements must be verified by using in-situ testing on the constructed test fill. The test fill... specifications in the permit. The program must be developed and implemented under the direction of a CQA officer... applicable units, and a description of how they will be constructed. (2) Identification of key personnel in...
FAST TRACK COMMUNICATION: Reversible arithmetic logic unit for quantum arithmetic
NASA Astrophysics Data System (ADS)
Kirkedal Thomsen, Michael; Glück, Robert; Axelsen, Holger Bock
2010-09-01
This communication presents the complete design of a reversible arithmetic logic unit (ALU) that can be part of a programmable reversible computing device such as a quantum computer. The presented ALU is garbage free and uses reversible updates to combine the standard reversible arithmetic and logical operations in one unit. Combined with a suitable control unit, the ALU permits the construction of an r-Turing complete computing device. The garbage-free ALU developed in this communication requires only 6n elementary reversible gates for five basic arithmetic-logical operations on two n-bit operands and does not use ancillae. This remarkable low resource consumption was achieved by generalizing the V-shape design first introduced for quantum ripple-carry adders and nesting multiple V-shapes in a novel integrated design. This communication shows that the realization of an efficient reversible ALU for a programmable computing device is possible and that the V-shape design is a very versatile approach to the design of quantum networks.
United States housing, first quarter 2013
Delton Alderman
2014-01-01
Provides current and historical information on housing market in the United States. Information includes trends for housing permits and starts, housing under construction, and housing completions for single and multifamily units, and sales and construction. This report will be updated regularly.
Large Advanced Space Systems (LASS) computer-aided design program additions
NASA Technical Reports Server (NTRS)
Farrell, C. E.
1982-01-01
The LSS preliminary and conceptual design requires extensive iteractive analysis because of the effects of structural, thermal, and control intercoupling. A computer aided design program that will permit integrating and interfacing of required large space system (LSS) analyses is discussed. The primary objective of this program is the implementation of modeling techniques and analysis algorithms that permit interactive design and tradeoff studies of LSS concepts. Eight software modules were added to the program. The existing rigid body controls module was modified to include solar pressure effects. The new model generator modules and appendage synthesizer module are integrated (interfaced) to permit interactive definition and generation of LSS concepts. The mass properties module permits interactive specification of discrete masses and their locations. The other modules permit interactive analysis of orbital transfer requirements, antenna primary beam n, and attitude control requirements.
Dolev, Danny; Függer, Matthias; Posch, Markus; Schmid, Ulrich; Steininger, Andreas; Lenzen, Christoph
2014-06-01
We present the first implementation of a distributed clock generation scheme for Systems-on-Chip that recovers from an unbounded number of arbitrary transient faults despite a large number of arbitrary permanent faults. We devise self-stabilizing hardware building blocks and a hybrid synchronous/asynchronous state machine enabling metastability-free transitions of the algorithm's states. We provide a comprehensive modeling approach that permits to prove, given correctness of the constructed low-level building blocks, the high-level properties of the synchronization algorithm (which have been established in a more abstract model). We believe this approach to be of interest in its own right, since this is the first technique permitting to mathematically verify, at manageable complexity, high-level properties of a fault-prone system in terms of its very basic components. We evaluate a prototype implementation, which has been designed in VHDL, using the Petrify tool in conjunction with some extensions, and synthesized for an Altera Cyclone FPGA.
Dolev, Danny; Függer, Matthias; Posch, Markus; Schmid, Ulrich; Steininger, Andreas; Lenzen, Christoph
2014-01-01
We present the first implementation of a distributed clock generation scheme for Systems-on-Chip that recovers from an unbounded number of arbitrary transient faults despite a large number of arbitrary permanent faults. We devise self-stabilizing hardware building blocks and a hybrid synchronous/asynchronous state machine enabling metastability-free transitions of the algorithm's states. We provide a comprehensive modeling approach that permits to prove, given correctness of the constructed low-level building blocks, the high-level properties of the synchronization algorithm (which have been established in a more abstract model). We believe this approach to be of interest in its own right, since this is the first technique permitting to mathematically verify, at manageable complexity, high-level properties of a fault-prone system in terms of its very basic components. We evaluate a prototype implementation, which has been designed in VHDL, using the Petrify tool in conjunction with some extensions, and synthesized for an Altera Cyclone FPGA. PMID:26516290
37 CFR 1.152 - Design drawings.
Code of Federal Regulations, 2012 CFR
2012-07-01
... are not permitted in a design drawing. Photographs and ink drawings are not permitted to be combined as formal drawings in one application. Photographs submitted in lieu of ink drawings in design patent...
37 CFR 1.152 - Design drawings.
Code of Federal Regulations, 2014 CFR
2014-07-01
... are not permitted in a design drawing. Photographs and ink drawings are not permitted to be combined as formal drawings in one application. Photographs submitted in lieu of ink drawings in design patent...
33 CFR 126.25 - Penalties for handling designated dangerous cargo without permit.
Code of Federal Regulations, 2014 CFR
2014-07-01
... dangerous cargo without permit. 126.25 Section 126.25 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) WATERFRONT FACILITIES HANDLING OF DANGEROUS CARGO AT WATERFRONT FACILITIES § 126.25 Penalties for handling designated dangerous cargo without permit. Handling, loading...
33 CFR 126.25 - Penalties for handling designated dangerous cargo without permit.
Code of Federal Regulations, 2010 CFR
2010-07-01
... dangerous cargo without permit. 126.25 Section 126.25 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) WATERFRONT FACILITIES HANDLING OF DANGEROUS CARGO AT WATERFRONT FACILITIES § 126.25 Penalties for handling designated dangerous cargo without permit. Handling, loading...
33 CFR 126.25 - Penalties for handling designated dangerous cargo without permit.
Code of Federal Regulations, 2012 CFR
2012-07-01
... dangerous cargo without permit. 126.25 Section 126.25 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) WATERFRONT FACILITIES HANDLING OF DANGEROUS CARGO AT WATERFRONT FACILITIES § 126.25 Penalties for handling designated dangerous cargo without permit. Handling, loading...
33 CFR 126.25 - Penalties for handling designated dangerous cargo without permit.
Code of Federal Regulations, 2011 CFR
2011-07-01
... dangerous cargo without permit. 126.25 Section 126.25 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) WATERFRONT FACILITIES HANDLING OF DANGEROUS CARGO AT WATERFRONT FACILITIES § 126.25 Penalties for handling designated dangerous cargo without permit. Handling, loading...
33 CFR 126.25 - Penalties for handling designated dangerous cargo without permit.
Code of Federal Regulations, 2013 CFR
2013-07-01
... dangerous cargo without permit. 126.25 Section 126.25 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) WATERFRONT FACILITIES HANDLING OF DANGEROUS CARGO AT WATERFRONT FACILITIES § 126.25 Penalties for handling designated dangerous cargo without permit. Handling, loading...
Code of Federal Regulations, 2013 CFR
2013-01-01
... required. 5 The impact statement shall take account of dose commitments and health effects from fuel cycle... the site proposed. The draft environmental impact statement must not include an assessment of the... certification environmental assessment, then the draft combined license environmental impact statement shall...
Code of Federal Regulations, 2014 CFR
2014-01-01
... required. 5 The impact statement shall take account of dose commitments and health effects from fuel cycle... the site proposed. The draft environmental impact statement must not include an assessment of the... certification environmental assessment, then the draft combined license environmental impact statement shall...
Code of Federal Regulations, 2011 CFR
2011-01-01
... required. 5 The impact statement shall take account of dose commitments and health effects from fuel cycle... the site proposed. The draft environmental impact statement must not include an assessment of the... certification environmental assessment, then the draft combined license environmental impact statement shall...
Code of Federal Regulations, 2012 CFR
2012-01-01
... required. 5 The impact statement shall take account of dose commitments and health effects from fuel cycle... the site proposed. The draft environmental impact statement must not include an assessment of the... certification environmental assessment, then the draft combined license environmental impact statement shall...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-06-17
...: Table 1--Entities Potentially Regulated by This Permit North American Examples of affected Industry... intend the preceding table to be exhaustive, but provides it as a guide for readers regarding entities.../wastetech/guide/construction/index.cfm . B. Extension of Comment Period EPA is extending the deadline for...
10 CFR 50.36b - Environmental conditions.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 10 Energy 1 2010-01-01 2010-01-01 false Environmental conditions. 50.36b Section 50.36b Energy... § 50.36b Environmental conditions. (a) Each construction permit under this part, each early site permit... conditions will be derived from information contained in the environmental report submitted pursuant to § 51...
Code of Federal Regulations, 2011 CFR
2011-10-01
... MINERALS MANAGEMENT (3000) GEOTHERMAL RESOURCE LEASING Lease Suspensions, Cessation of Production, Royalty Rate Reductions, and Energy Policy Act Royalty Rate Conversions § 3212.22 What criteria establish a new... not: (1) Be permitted only with a Geothermal Drilling Permit; (2) Be constructed entirely within the...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-11-12
... incidental take permits for United's construction, operations, and maintenance of water management facilities... maintenance of the Freeman Diversion; diversion of water from the Santa Clara River; vegetation management... current and future water management activities. United intends to request a 50-year permit covering five...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-12-08
... review programs for new or modified stationary sources of air pollution. In addition, the provisions of... the emissions from the construction and modification of any stationary source of air pollution to... Flexible Air Permitting Rule also slightly reduced the burden per minor NSR permit. As a result of all...
40 CFR 52.1384 - Emission control regulations.
Code of Federal Regulations, 2010 CFR
2010-07-01
... construction permit to override a requirement that has been approved as part of the SIP, are disapproved. We cannot approve these provisions into the SIP, as it would allow the State to change a SIP requirement through the issuance of a permit. Pursuant to section 110 of the Act, to change a requirement of the SIP...
A Phloem Sandwich Unit for Observing Bark Beetles, Associated Predators, and Parasites
Donald N. Kim; Mitchel C. Miller
1981-01-01
This paper describes a phloem sandwich that allows observation of parent beetles, their brood, and associates within the inner bark, and permits observation of predator and parasite behavior on the bark surface. The construction of the unit permits the introduction of multiple pairs of beetles into a single sandwich.
29 CFR 1926.152 - Flammable liquids.
Code of Federal Regulations, 2014 CFR
2014-07-01
... to permit approach of fire control apparatus. (3) The storage area shall be graded in a manner to... feet of each portable tank, there shall be a 12-foot-wide access way to permit approach of fire control... storage cabinets shall be constructed in the following manner, or equivalent: The bottom, sides, and top...
Burns, Gully APC; Cheng, Wei-Cheng
2006-01-01
Background Knowledge bases that summarize the published literature provide useful online references for specific areas of systems-level biology that are not otherwise supported by large-scale databases. In the field of neuroanatomy, groups of small focused teams have constructed medium size knowledge bases to summarize the literature describing tract-tracing experiments in several species. Despite years of collation and curation, these databases only provide partial coverage of the available published literature. Given that the scientists reading these papers must all generate the interpretations that would normally be entered into such a system, we attempt here to provide general-purpose annotation tools to make it easy for members of the community to contribute to the task of data collation. Results In this paper, we describe an open-source, freely available knowledge management system called 'NeuroScholar' that allows straightforward structured markup of the PDF files according to a well-designed schema to capture the essential details of this class of experiment. Although, the example worked through in this paper is quite specific to neuroanatomical connectivity, the design is freely extensible and could conceivably be used to construct local knowledge bases for other experiment types. Knowledge representations of the experiment are also directly linked to the contributing textual fragments from the original research article. Through the use of this system, not only could members of the community contribute to the collation task, but input data can be gathered for automated approaches to permit knowledge acquisition through the use of Natural Language Processing (NLP). Conclusion We present a functional, working tool to permit users to populate knowledge bases for neuroanatomical connectivity data from the literature through the use of structured questionnaires. This system is open-source, fully functional and available for download from [1]. PMID:16895608
Design, fabrication, and performance of foil journal bearing for the brayton rotating unit
NASA Technical Reports Server (NTRS)
Licht, L.; Branger, M.
1973-01-01
Foil bearings were designed and manufactured to replace pivoted-shoe journal bearings in an existing Brayton Cycle turbo-alternator-compressor. The design of this unconventional rotor support was accomplished within the constraints and space limitations imposed by the present machine, and the substitution of foil bearings was effected without changes or modification other machine components. A housing and a test rig were constructed to incorporate the new foil-bearing support into a unified assemble with an air-driven rotor and the gimbal-mounted thrust bearing, seals, and shrouds of an actual Brayton Rotating Unit. The foil bearing required no external pressure source, and stable self-acting rotation was achieved at all speeds up to 43,200 rpm. Excellent wipe-wear characteristics of the foil bearing permitted well over 1000 start-stop cycles with no deterioriation of performance in the entire speed range.
Design and analysis of a fast, two-mirror soft-x-ray microscope
NASA Technical Reports Server (NTRS)
Shealy, D. L.; Wang, C.; Jiang, W.; Jin, L.; Hoover, R. B.
1992-01-01
During the past several years, a number of investigators have addressed the design, analysis, fabrication, and testing of spherical Schwarzschild microscopes for soft-x-ray applications using multilayer coatings. Some of these systems have demonstrated diffraction limited resolution for small numerical apertures. Rigorously aplanatic, two-aspherical mirror Head microscopes can provide near diffraction limited resolution for very large numerical apertures. The relationships between the numerical aperture, mirror radii and diameters, magnifications, and total system length for Schwarzschild microscope configurations are summarized. Also, an analysis of the characteristics of the Head-Schwarzschild surfaces will be reported. The numerical surface data predicted by the Head equations were fit by a variety of functions and analyzed by conventional optical design codes. Efforts have been made to determine whether current optical substrate and multilayer coating technologies will permit construction of a very fast Head microscope which can provide resolution approaching that of the wavelength of the incident radiation.
Status of H-Coal commercial activities. [Kentucky
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hicks, H.N. Jr.
1981-01-01
The H-Coal process is a development of Hydrocarbon Research, Inc. (HRI). It converts coal by catalytic hydrogenation to substitutes for petroleum ranging from a low sulfur fuel oil to an all distillate synthetic crude, the latter representing a potential source of raw material for the petrochemical industry. The process is a related application to HRI's H-Oil process which is used commercially for the desulfurization of residual oils from crude oil refining. A large scale pilot plant was constructed at Catlettsburg, Kentucky that is designed to process 200 to 600 TPD of coal. The paper includes an update on the keymore » activities associated with the Breckinridge Project: Pilot Plant H-Coal at Catlettsburg, Kentucky; commercial design activities in Houston; and permit and EIS activities for the Addison, Kentucky plant site.« less
NASA Technical Reports Server (NTRS)
Glenar, D. A.
1981-01-01
A state of the art, tunable diode laser infrared heterodyne spectrometer was designed and constructed for ground based observations throughout the 8 to 12 micron atmospheric window. The instrument was optimized for use with presently available tunable diode lasers, and was designed as a flexible field system for use with large reflecting telescopes. The instrument was aligned and calibrated using laboratory and astronomical sources. Observations of SiO fundamental (v = 1-0) and hot band (v = 2-1) absorption features were made in sunspots near 8 microns using the spectrometer. The data permit an unambiguous determination of the temperature pressure relation in the upper layers of the umbral atmosphere, and support the sunspot model suggested by Stellmacher and Wiehr.
''Football'' test coil: a simulated service test of internally-cooled, cabled superconductor
DOE Office of Scientific and Technical Information (OSTI.GOV)
Marston, P.G.; Iwasa, Y.; Thome, R.J.
Internally-cooled, cabled superconductor, (ICCS), appears from small-scale tests to be a viable alternative to pool-boiling cooled superconductors for large superconducting magnets. Potential advantages may include savings in helium inventory, smaller structure and ease of fabrication. Questions remain, however, about the structural performance of these systems. The ''football'' test coil has been designed to simulate the actual ''field-current-stress-thermal'' operating conditions of a 25 ka ICCS in a commercial scale MHD magnet. The test procedure will permit demonstration of the 20 year cyclic life of such a magnet in less than 20 days. This paper describes the design, construction and test ofmore » that coil which is wound of copper-stabilized niobium-titanium cable in steel conduit. 2 refs.« less
75 FR 61577 - Wage Methodology for the Temporary Non-Agricultural Employment H-2B Program
Federal Register 2010, 2011, 2012, 2013, 2014
2010-10-05
... workers certified in the top five industries were as follows: Construction--30,242; Amusement, Gambling... employment in each of these industries: Construction--0.4 percent (30,242/7,265,648); Amusement, Gambling... permitted each year: Construction--0.2 percent (14,756/7,265,648); Amusement, Gambling, and Recreation--0.5...
United States housing, fourth quarter 2013
Delton Alderman
2017-01-01
In the beginning of 2013, the U.S. housing construction market indicated increases in all sectors; yet, by the fourth quarterâs end, only housing under construction improved. Moderation and declines are to be expected in the fourth quarter, as winter is setting in. Permits, starts, housing under construction, completions, and new and existing house sales all exceeded...
Del Medico, Luca; Christen, Heinz; Christen, Beat
2017-01-01
Recent advances in lower-cost DNA synthesis techniques have enabled new innovations in the field of synthetic biology. Still, efficient design and higher-order assembly of genome-scale DNA constructs remains a labor-intensive process. Given the complexity, computer assisted design tools that fragment large DNA sequences into fabricable DNA blocks are needed to pave the way towards streamlined assembly of biological systems. Here, we present the Genome Partitioner software implemented as a web-based interface that permits multi-level partitioning of genome-scale DNA designs. Without the need for specialized computing skills, biologists can submit their DNA designs to a fully automated pipeline that generates the optimal retrosynthetic route for higher-order DNA assembly. To test the algorithm, we partitioned a 783 kb Caulobacter crescentus genome design. We validated the partitioning strategy by assembling a 20 kb test segment encompassing a difficult to synthesize DNA sequence. Successful assembly from 1 kb subblocks into the 20 kb segment highlights the effectiveness of the Genome Partitioner for reducing synthesis costs and timelines for higher-order DNA assembly. The Genome Partitioner is broadly applicable to translate DNA designs into ready to order sequences that can be assembled with standardized protocols, thus offering new opportunities to harness the diversity of microbial genomes for synthetic biology applications. The Genome Partitioner web tool can be accessed at https://christenlab.ethz.ch/GenomePartitioner. PMID:28531174
Wave Phase-Sensitive Transformation of 3d-Straining of Mechanical Fields
NASA Astrophysics Data System (ADS)
Smirnov, I. N.; Speranskiy, A. A.
2015-11-01
It is the area of research of oscillatory processes in elastic mechanical systems. Technical result of innovation is creation of spectral set of multidimensional images which reflect time-correlated three-dimensional vector parameters of metrological, and\\or estimated, and\\or design parameters of oscillations in mechanical systems. Reconstructed images of different dimensionality integrated in various combinations depending on their objective function can be used as homeostatic profile or cybernetic image of oscillatory processes in mechanical systems for an objective estimation of current operational conditions in real time. The innovation can be widely used to enhance the efficiency of monitoring and research of oscillation processes in mechanical systems (objects) in construction, mechanical engineering, acoustics, etc. Concept method of vector vibrometry based on application of vector 3D phase- sensitive vibro-transducers permits unique evaluation of real stressed-strained states of power aggregates and loaded constructions and opens fundamental innovation opportunities: conduct of continuous (on-line regime) reliable monitoring of turboagregates of electrical machines, compressor installations, bases, supports, pipe-lines and other objects subjected to damaging effect of vibrations; control of operational safety of technical systems at all the stages of life cycle including design, test production, tuning, testing, operational use, repairs and resource enlargement; creation of vibro-diagnostic systems of authentic non-destructive control of anisotropic characteristics of materials resistance of power aggregates and loaded constructions under outer effects and operational flaws. The described technology is revolutionary, universal and common for all branches of engineering industry and construction building objects.
Garrido, E; Calvo, F; Ramos, A F; Zamorano, M
2005-11-01
Current legislation in the European Union regarding landfills provides measures, procedures and guidance to prevent or reduce, insofar as possible, negative effects on the environment. This means that Member States must take measures so that landfills cannot operate unless the operator first presents a plan for the site, which includes the implementation of improvements considered necessary by the engineer for compliance with regulations. Researchers at the University of Granada have developed a method to ascertain the degree of environmental impact that a construction and demolition waste landfill may produce on its immediate surroundings. This methodology is based on environmental indexes; its objective is to give crucial information concerning possible environmental problems produced by a landfill. The data thus obtained will permit the elaboration of guidelines for improvements in the location, design, and operation of landfills, or in extreme cases, their dosing, sealing, and rehabilitation.
NASA Technical Reports Server (NTRS)
Price, P. B.
1978-01-01
The feasibility of the design, construction, launch and retrieval of a hinged 15 ft by 110 ft the platform containing an array of interleaved CR-39 and Lexan track-recording detectors to be placed into circular orbit by space shuttle is assessed. The total weight of the detector assembly plus supporting structure and accessories is 32,000 pounds. The modular construction permits as little as one fourth of the payload to be exposed at one time. The CR-39 detector has sensitivity adequate to detect and study cosmic rays ranging from minimum ionizing iron-group nuclei to the heaviest elements. The detectors will survive a one year exposure to trapped protons without losing their high resolution. Advantages include low cost, huge collecting power (approximately 150 sq m) as well as the high resolution previously attainable only with electronic detectors.
Supersonic CO electric-discharge lasers
NASA Technical Reports Server (NTRS)
Hason, R. K.; Mitchner, M.; Stanton, A.
1975-01-01
Laser modeling activity is described which involved addition of an option allowing N2 as a second diatomic gas. This option is now operational and a few test cases involving N2/CO mixtures were run. Results from these initial test cases are summarized. In the laboratory, a CW double-discharge test facility was constructed and tested. Features include: water-cooled removable electrodes, O-ring construction to facilitate cleaning and design modifications, increased discharge length, and addition of a post-discharge observation section. Preliminary tests with this facility using N2 yielded higher power loadings than obtained in the first-generation facility. Another test-section modification, recently made and as yet untested, will permit injection of secondary gases into the cathode boundary layer. The objective will be to vary and enhance the UV emission spectrum from the auxiliary discharge, thereby influencing the level of photoionization in the main discharge region.
Investigation of the strength of shielded and unshielded underwater electrical cables
NASA Astrophysics Data System (ADS)
Glowe, D. E.; Arnett, S. L.
1981-09-01
The mechanical properties of shielded and unshielded submarine cables (MIL-C-915/8E) were investigated to determine the effect of shielding on cable life, performance, and reliability. Ten cables (five shielded and five unshielded) were selected for laboratory evaluation. A mission profile was developed to establish the mechanical stress limits that cables must endure in service and a test sequence designed to measure tensile strength, flexural abrasion endurance, crush resistance, creep under static tension, and performance in a hull-stuffing tube. The results of this program showed that: (1) DSS-2 cable does not have adequate tensile strength and should have a strength member added. DSS-3 and larger cables have adequate tensile strength with or without the shield; (2) Unshielded DSS-3 type cable does not perform satisfactorily in hull-stuffing tubes; (3) Shielding is not required to meet mission profile specifications for cable crush or flexural abrasion resistance; (4) Construction parameters other than shielding can significantly affect mechanical performance of cable; (5) Unshielded cable construction can result in increased reliability since it permits a thicker single-jacket construction; and (6) Unshielded cable construction can reduce the cost of cable by 8 to 20 percent.
Dontsov, E V
2016-12-01
This paper develops a closed-form approximate solution for a penny-shaped hydraulic fracture whose behaviour is determined by an interplay of three competing physical processes that are associated with fluid viscosity, fracture toughness and fluid leak-off. The primary assumption that permits one to construct the solution is that the fracture behaviour is mainly determined by the three-process multiscale tip asymptotics and the global fluid volume balance. First, the developed approximation is compared with the existing solutions for all limiting regimes of propagation. Then, a solution map, which indicates applicability regions of the limiting solutions, is constructed. It is also shown that the constructed approximation accurately captures the scaling that is associated with the transition from any one limiting solution to another. The developed approximation is tested against a reference numerical solution, showing that accuracy of the fracture width and radius predictions lie within a fraction of a per cent for a wide range of parameters. As a result, the constructed approximation provides a rapid solution for a penny-shaped hydraulic fracture, which can be used for quick fracture design calculations or as a reference solution to evaluate accuracy of various hydraulic fracture simulators.
NASA Astrophysics Data System (ADS)
Dontsov, E. V.
2016-12-01
This paper develops a closed-form approximate solution for a penny-shaped hydraulic fracture whose behaviour is determined by an interplay of three competing physical processes that are associated with fluid viscosity, fracture toughness and fluid leak-off. The primary assumption that permits one to construct the solution is that the fracture behaviour is mainly determined by the three-process multiscale tip asymptotics and the global fluid volume balance. First, the developed approximation is compared with the existing solutions for all limiting regimes of propagation. Then, a solution map, which indicates applicability regions of the limiting solutions, is constructed. It is also shown that the constructed approximation accurately captures the scaling that is associated with the transition from any one limiting solution to another. The developed approximation is tested against a reference numerical solution, showing that accuracy of the fracture width and radius predictions lie within a fraction of a per cent for a wide range of parameters. As a result, the constructed approximation provides a rapid solution for a penny-shaped hydraulic fracture, which can be used for quick fracture design calculations or as a reference solution to evaluate accuracy of various hydraulic fracture simulators.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Mayerovitch, M.D.
1980-03-25
A solar collector cell formed as an integral portion of a roof flashing is disclosed as comprising a flashing base having a dihedral surface including a larger base portion and a smaller ramp portion, and a solar collector cell container built integrally with the base portion of the flashing. The combination is designed to be installed in the roof of a dwelling or other building structure. The container portion of the flashing is substantially shorter in height above the roof line than conventional solar collector cell structures added to a roof subsequent to its construction. As a result, the inventionmore » gives the building constructor or owner, the option of either including the solar cell components at the time of construction of the roof to provide a solar heating device, or to fill the solar collector cell container with a temporary support structure, such as roof shakes or tiles. The shape of the solar collector cell and flashing assembly permits the solar collector cell structure to be camouflaged by overlying shakes or tiles of which the roof is constructed.« less
40 CFR 69.11 - New exemptions.
Code of Federal Regulations, 2010 CFR
2010-07-01
... Administrator of the Environmental Protection Agency (“EPA”) conditionally exempts electric generating units on... significant deterioration (“PSD”) permit prior to construction is granted for the electric generating units... to be constructed at Orote, with the following conditions: (i) Each electric generating unit shall...
Water Quality Trading Toolkit for Permit Writers
The Water Quality Trading Toolkit for Permit Writers is EPA’s first “how-to” manual on designing and implementing water quality trading programs. It helps NPDES permitting authorities incorporate trading provisions into permits.
A Study of Fixed-Order Mixed Norm Designs for a Benchmark Problem in Structural Control
NASA Technical Reports Server (NTRS)
Whorton, Mark S.; Calise, Anthony J.; Hsu, C. C.
1998-01-01
This study investigates the use of H2, p-synthesis, and mixed H2/mu methods to construct full-order controllers and optimized controllers of fixed dimensions. The benchmark problem definition is first extended to include uncertainty within the controller bandwidth in the form of parametric uncertainty representative of uncertainty in the natural frequencies of the design model. The sensitivity of H2 design to unmodelled dynamics and parametric uncertainty is evaluated for a range of controller levels of authority. Next, mu-synthesis methods are applied to design full-order compensators that are robust to both unmodelled dynamics and to parametric uncertainty. Finally, a set of mixed H2/mu compensators are designed which are optimized for a fixed compensator dimension. These mixed norm designs recover the H, design performance levels while providing the same levels of robust stability as the u designs. It is shown that designing with the mixed norm approach permits higher levels of controller authority for which the H, designs are destabilizing. The benchmark problem is that of an active tendon system. The controller designs are all based on the use of acceleration feedback.
75 FR 65646 - Endangered and Threatened Wildlife and Plants; Permit, Santa Barbara County, CA
Federal Register 2010, 2011, 2012, 2013, 2014
2010-10-26
... II of the Lompoc Wind Energy Project would involve the construction and operation of wind turbines... DEPARTMENT OF THE INTERIOR Fish and Wildlife Service [FWS-R8-ES-2010-N235; 1112-0000-81440-F2] Endangered and Threatened Wildlife and Plants; Permit, Santa Barbara County, CA AGENCY: U.S. Fish and...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-10-20
... permit applicant's burden and streamline the permitting process for de minimis circumstances. These tools... pollutant is de minimis. An emission increase for a particular pollutant that is greater than the SER... construct, is less than the SMC, i.e., de minimis, and may be allowed to forego the preconstruction...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-08-27
...-FF04EF2000] Endangered and Threatened Wildlife and Plants; Receipt of Application for Incidental Take Permit... 1.49 acres of foraging, breeding, and sheltering habitat used by the Florida scrub-jay (Aphelocoma... taking 1.49 acre of Florida scrub-jay breeding, feeding, and sheltering habitat for construction of a...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-06-17
... facilities in the United States. This permit is subject to the following conditions: Article 1. The United... Secretary of State or the Secretary's delegate. Article 2. (1) Standards for, and manner of, the... Authority Number 0170.1. Article 3. The permittee shall comply with all Federal and State laws and...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-03-15
... Permits for the construction, connection, operation, or maintenance at the borders of the United States... Department for an amendment to their current Presidential Permit authorizing it to operate at a higher... address current and future demand by U.S. and Canada refineries for supplies of heavy crude oil from the...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-10-26
... incorporates District Rule 2410-- Prevention of Significant Deterioration (PSD)--into the California SIP to establish a PSD permit program for pre-construction review of certain new and modified major stationary... provides an adequate PSD permitting program as required by section 110 and part C of title I of the CAA...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-09-23
..., while providing for the operation and maintenance of the SDG&E electric powerline system. The project... communities, residents, businesses, and government owned facilities located within and adjacent to the... managed by the Bureau of Land Management (BLM); tribal lands of the La Jolla, Campo, Inaja, and Viejas...
33 CFR 126.17 - Permits required for handling designated dangerous cargo.
Code of Federal Regulations, 2013 CFR
2013-07-01
... designated dangerous cargo. 126.17 Section 126.17 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) WATERFRONT FACILITIES HANDLING OF DANGEROUS CARGO AT WATERFRONT FACILITIES § 126.17 Permits required for handling designated dangerous cargo. Designated dangerous cargo may be...
33 CFR 126.17 - Permits required for handling designated dangerous cargo.
Code of Federal Regulations, 2014 CFR
2014-07-01
... designated dangerous cargo. 126.17 Section 126.17 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) WATERFRONT FACILITIES HANDLING OF DANGEROUS CARGO AT WATERFRONT FACILITIES § 126.17 Permits required for handling designated dangerous cargo. Designated dangerous cargo may be...
33 CFR 126.17 - Permits required for handling designated dangerous cargo.
Code of Federal Regulations, 2012 CFR
2012-07-01
... designated dangerous cargo. 126.17 Section 126.17 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) WATERFRONT FACILITIES HANDLING OF DANGEROUS CARGO AT WATERFRONT FACILITIES § 126.17 Permits required for handling designated dangerous cargo. Designated dangerous cargo may be...
33 CFR 126.17 - Permits required for handling designated dangerous cargo.
Code of Federal Regulations, 2010 CFR
2010-07-01
... designated dangerous cargo. 126.17 Section 126.17 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) WATERFRONT FACILITIES HANDLING OF DANGEROUS CARGO AT WATERFRONT FACILITIES § 126.17 Permits required for handling designated dangerous cargo. Designated dangerous cargo may be...
33 CFR 126.17 - Permits required for handling designated dangerous cargo.
Code of Federal Regulations, 2011 CFR
2011-07-01
... designated dangerous cargo. 126.17 Section 126.17 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) WATERFRONT FACILITIES HANDLING OF DANGEROUS CARGO AT WATERFRONT FACILITIES § 126.17 Permits required for handling designated dangerous cargo. Designated dangerous cargo may be...
Rocket instrument for far-UV spectrophotometry of faint astronomical objects.
Hartig, G F; Fastie, W G; Davidsen, A F
1980-03-01
A sensitive sounding rocket instrument for moderate (~10-A) resolution far-UV (lambda1160-lambda1750-A) spectrophotometry of faint astronomical objects has been developed. The instrument employs a photon-counting microchannel plate imaging detector and a concave grating spectrograph behind a 40-cm Dall-Kirkham telescope. A unique remote-control pointing system, incorporating an SIT vidicon aspect camera, two star trackers, and a tone-encoded command telemetry link, permits the telescope to be oriented to within 5 arc sec of any target for which suitable guide stars can be found. The design, construction, calibration, and flight performance of the instrument are discussed.
Space Station crew workload - Station operations and customer accommodations
NASA Technical Reports Server (NTRS)
Shinkle, G. L.
1985-01-01
The features of the Space Station which permit crew members to utilize work time for payload operations are discussed. The user orientation, modular design, nonstressful flight regime, in space construction, on board control, automation and robotics, and maintenance and servicing of the Space Station are examined. The proposed crew size, skills, and functions as station operator and mission specialists are described. Mission objectives and crew functions, which include performing material processing, life science and astronomy experiments, satellite and payload equipment servicing, systems monitoring and control, maintenance and repair, Orbital Maneuvering Vehicle and Mobile Remote Manipulator System operations, on board planning, housekeeping, and health maintenance and recreation, are studied.
Neuropsychology 3.0: Evidence-Based Science and Practice
Bilder, Robert M.
2011-01-01
Neuropsychology is poised for transformations of its concepts and methods, leveraging advances in neuroimaging, the human genome project, psychometric theory, and information technologies. It is argued that a paradigm shift towards evidence-based science and practice can be enabled by innovations, including: (1) formal definition of neuropsychological concepts and tasks in cognitive ontologies; (2) creation of collaborative neuropsychological knowledgebases; and (3) design of web-based assessment methods that permit free development, large-sample implementation, and dynamic refinement of neuropsychological tests and the constructs these aim to assess. This article considers these opportunities, highlights selected obstacles, and offers suggestions for stepwise progress towards these goals. PMID:21092355
Endurance testing of a 30-cm Kaufman thruster
NASA Technical Reports Server (NTRS)
Collett, C. R.
1973-01-01
Results of a program to demonstrate lifetime capability of a 30-cm Kaufman ion thruster with a 6000 hour endurance test are described. Included in the program are (1) thruster fabrication, (2) design and construction of a test console containing a transistorized high frequency power processor, and control circuits which provide unattended automatic operation of the thruster, and (3) modification of a vacuum facility to incorporate a frozen mercury collector and permit unattended operation. Four tests ranging in duration from 100 to 1100 hours have been completed. These tests and the resulting thruster modifications are described. The status of the endurance test is also presented.
There and Back Again: An Acquisition Study
ERIC Educational Resources Information Center
Xu, Ting; Snyder, William
2017-01-01
When "again" modifies an English goal-PP construction, the sentence is ambiguous between a repetitive and a restitutive reading. Interestingly, languages vary in whether their counterpart to English "again" permits a restitutive reading with goal-PP constructions (Beck 2005; Beck & Snyder 2001). This article explores how…
7 CFR 1740.9 - Grant application.
Code of Federal Regulations, 2011 CFR
2011-01-01
... authorized the initiation of digital broadcasting at the project sites. In the event that an FCC construction... advance of funds for that site conditional upon the submission of a construction permit. (j) Compliance... Digital Transition,” and must include the Environmental Questionnaire/Certification, available from RUS...
Emulsion Inks for 3D Printing of High Porosity Materials.
Sears, Nicholas A; Dhavalikar, Prachi S; Cosgriff-Hernandez, Elizabeth M
2016-08-01
Photocurable emulsion inks for use with solid freeform fabrication (SFF) to generate constructs with hierarchical porosity are presented. A high internal phase emulsion (HIPE) templating technique was utilized to prepare water-in-oil emulsions from a hydrophobic photopolymer, surfactant, and water. These HIPEs displayed strong shear thinning behavior that permitted layer-by-layer deposition into complex shapes and adequately high viscosity at low shear for shape retention after extrusion. Each layer was actively polymerized with an ultraviolet cure-on-dispense (CoD) technique and compositions with sufficient viscosity were able to produce tall, complex scaffolds with an internal lattice structure and microscale porosity. Evaluation of the rheological and cure properties indicated that the viscosity and cure rate both played an important role in print fidelity. These 3D printed polyHIPE constructs benefit from the tunable pore structure of emulsion templated material and the designed architecture of 3D printing. As such, these emulsion inks can be used to create ultra high porosity constructs with complex geometries and internal lattice structures not possible with traditional manufacturing techniques. © 2016 WILEY-VCH Verlag GmbH & Co. KGaA, Weinheim.
DOE Office of Scientific and Technical Information (OSTI.GOV)
McCorkle, D.; Yang, C.; Jordan, T.
2007-06-01
Modeling and simulation tools are becoming pervasive in the process engineering practice of designing advanced power generation facilities. These tools enable engineers to explore many what-if scenarios before cutting metal or constructing a pilot scale facility. While such tools enable investigation of crucial plant design aspects, typical commercial process simulation tools such as Aspen Plus®, gPROMS®, and HYSYS® still do not explore some plant design information, including computational fluid dynamics (CFD) models for complex thermal and fluid flow phenomena, economics models for policy decisions, operational data after the plant is constructed, and as-built information for use in as-designed models. Softwaremore » tools must be created that allow disparate sources of information to be integrated if environments are to be constructed where process simulation information can be accessed. At the Department of Energy’s (DOE) National Energy Technology Laboratory (NETL), the Advanced Process Engineering Co-Simulator (APECS) has been developed as an integrated software suite that combines process simulation (e.g., Aspen Plus) and high-fidelity equipment simulation (e.g., Fluent® CFD), together with advanced analysis capabilities including case studies, sensitivity analysis, stochastic simulation for risk/uncertainty analysis, and multi-objective optimization. In this paper, we discuss the initial phases of integrating APECS with the immersive and interactive virtual engineering software, VE-Suite, developed at Iowa State University and Ames Laboratory. VE-Suite utilizes the ActiveX (OLE Automation) controls in Aspen Plus wrapped by the CASI library developed by Reaction Engineering International to run the process simulation and query for unit operation results. This integration permits any application that uses the VE-Open interface to integrate with APECS co-simulations, enabling construction of the comprehensive virtual engineering environment needed for the rapid engineering of advanced power generation facilities.« less
43 CFR 3802.1-1 - When required.
Code of Federal Regulations, 2012 CFR
2012-10-01
..., DEPARTMENT OF THE INTERIOR MINERALS MANAGEMENT (3000) MINING CLAIMS UNDER THE GENERAL MINING LAWS Exploration... which involve construction of means of access, including bridges, landing areas for aircraft, or... can be covered by a temporory use permit issued under part 2930 of this chapter; (e) The construction...
43 CFR 3802.1-1 - When required.
Code of Federal Regulations, 2013 CFR
2013-10-01
..., DEPARTMENT OF THE INTERIOR MINERALS MANAGEMENT (3000) MINING CLAIMS UNDER THE GENERAL MINING LAWS Exploration... which involve construction of means of access, including bridges, landing areas for aircraft, or... can be covered by a temporory use permit issued under part 2930 of this chapter; (e) The construction...
43 CFR 3802.1-1 - When required.
Code of Federal Regulations, 2014 CFR
2014-10-01
..., DEPARTMENT OF THE INTERIOR MINERALS MANAGEMENT (3000) MINING CLAIMS UNDER THE GENERAL MINING LAWS Exploration... which involve construction of means of access, including bridges, landing areas for aircraft, or... can be covered by a temporory use permit issued under part 2930 of this chapter; (e) The construction...
43 CFR 3802.1-1 - When required.
Code of Federal Regulations, 2011 CFR
2011-10-01
..., DEPARTMENT OF THE INTERIOR MINERALS MANAGEMENT (3000) MINING CLAIMS UNDER THE GENERAL MINING LAWS Exploration... which involve construction of means of access, including bridges, landing areas for aircraft, or... can be covered by a temporory use permit issued under part 2930 of this chapter; (e) The construction...
Do post-mining constructed channels replace functional characteristics of headwater streams?
Mountaintop mining and valley fill (MTMVF) is a method of coal mining common in eastern Kentucky and southern West Virginia. Over 1200 miles of stream channel have been buried by MTMVF. Permits for surface coal mining have recognized constructed drainage ditches associated with ...
NASA Astrophysics Data System (ADS)
Garsha, Karl E.
2004-06-01
There is an increasing amount of interest in functionalized microstructural, microphotonic and microelectromechanical systems (MEMS) for use in biological applications. By scanning a tightly focused ultra-short pulsed laser beam inside a wide variety of commercially available polymer systems, the flexibility of the multiphoton microscope can be extended to include routine manufacturing of micro-devices with feature sizes well below the diffraction limit. Compared with lithography, two-photon polymerization has the unique ability to additively realize designs with high resolution in three dimensions; this permits the construction of cross-linked components and structures with hollow cavities. In light of the increasing availability of multiphoton imaging systems at research facilities, femtosecond laser manufacturing becomes particularly attractive in that the modality provides a readily accessible, rapid and high-accuracy 3-D processing capability to biological investigators interested in culture scaffolds and biomimetic tissue engineering, bio-MEMS, biomicrophotonics and microfluidics applications. This manuscript overviews recent efforts towards to enabling user accessible 3-D micro-manufacturing capabilities on a conventional proprietary-based imaging system. Software which permits the off-line design of microstructures and leverages the extensibility of proprietary LCSM image acquisition software to realize designs is introduced. The requirements for multiphoton photo-disruption (ablation) are in some ways analogous to those for multiphoton polymerization. Hence, "beam-steering" also facilitates precision photo-disruption of biological tissues with 3-D resolution, and applications involving tissue microdissection and intracellular microsurgery or three-dimensionally resolved fluorescence recovery after photobleaching (FRAP) studies can benefit from this work as well.
Design, construction, prototype tests and performance of a vertex chamber for the MAC detector
NASA Astrophysics Data System (ADS)
Ash, W. W.; Band, H. R.; Bloom, E. D.; Bosman, M.; Camporesi, T.; Chadwick, G. B.; Delfino, M. C.; De Sangro, R.; Ford, W. T.; Gettner, M. W.; Goderre, G. P.; Godfrey, G. L.; Groom, D. E.; Hurst, R. B.; Johnson, J. R.; Lau, K. H.; Lavine, T. L.; Leedy, R. E.; Lippi, I.; Maruyama, T.; Messner, R. L.; Moromisato, J. H.; Moss, L. J.; Muller, F.; Nelson, H. N.; Peruzzi, I.; Piccolo, M.; Prepost, R.; Pyrlik, J.; Qi, N.; Read, A. L.; Ritson, D. M.; Rosenberg, L. J.; Shambroom, W. D.; Sleeman, J. C.; Smith, J. G.; Venuti, J. P.; Verdini, P. G.; Von Goeler, E.; Wald, H. B.; Weinstein, R.; Wiser, D. E.; Zdarko, R. W.
1987-11-01
The design considerations, construction techniques, prototype tests and performance characteristics of a pressurized drift chamber used in the MAC detector at PEP are described. The chamber consists of 324 aluminized mylar tubes of 6.9 mm diameter with wall thickness of 100 μm. With appropriate shielding it operates successfully at 4.6 cm from the beam line. It was simple to construct and was configured to permit any malfunctioning tubes to be remotely disconnected without affecting operation. The chamber operated without problems for two years in the PEP environment with a gas mixture of 49.5% argon, 49.5% CO 2, 1% CH 4, at 4 atm absolute pressure. The mean spatial resolution averaged over all tubes was 45 μm. The time to distance relation for this gas mixture, along with the geometric positioning of individual wires relative to the central tracking chamber, was obtained with data from Bhabha scattering events. We also describe resolution studies performed with a prototype chamber in a SLAC test beam. A wide range of gases, gas pressures, and electronic parameters were explored. These studies proved that resolutions in the 10-50 μm range were possible. Our experience demonstrates that chambers of this type provide high precision tracking and are particularly suited for operation in regions with difficult physical access and/or high ambient radiation levels.
Code of Federal Regulations, 2013 CFR
2013-07-01
... application for my existing small municipal waste combustion unit? 62.15400 Section 62.15400 Protection of... Combustion Units Constructed on or Before August 30, 1999 Title V Requirements § 62.15400 When must I submit a title V permit application for my existing small municipal waste combustion unit? (a) You must...
Code of Federal Regulations, 2012 CFR
2012-07-01
... application for my existing small municipal waste combustion unit? 62.15400 Section 62.15400 Protection of... Combustion Units Constructed on or Before August 30, 1999 Title V Requirements § 62.15400 When must I submit a title V permit application for my existing small municipal waste combustion unit? (a) You must...
Code of Federal Regulations, 2014 CFR
2014-07-01
... application for my existing small municipal waste combustion unit? 62.15400 Section 62.15400 Protection of... Combustion Units Constructed on or Before August 30, 1999 Title V Requirements § 62.15400 When must I submit a title V permit application for my existing small municipal waste combustion unit? (a) You must...
Code of Federal Regulations, 2010 CFR
2010-07-01
... application for my existing small municipal waste combustion unit? 62.15400 Section 62.15400 Protection of... Combustion Units Constructed on or Before August 30, 1999 Title V Requirements § 62.15400 When must I submit a title V permit application for my existing small municipal waste combustion unit? (a) You must...
Code of Federal Regulations, 2011 CFR
2011-07-01
... application for my existing small municipal waste combustion unit? 62.15400 Section 62.15400 Protection of... Combustion Units Constructed on or Before August 30, 1999 Title V Requirements § 62.15400 When must I submit a title V permit application for my existing small municipal waste combustion unit? (a) You must...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-01-21
.... The commenter also argues that, in the event that only one applicant places a bid on a permit, that...). The Commission makes no warranty whatsoever with respect to the FCC Auction System. In no event shall..., 2011 Short-Form Application (FCC Form 175) Filing Window Opens--January 31, 2011; 12 noon ET Short-Form...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Rivkin, C.; Blake, C.; Burgess, R.
This report explains the Regulations, Codes, and Standards (RCS) requirements for hydrogen dispensing stations in the State of California. The reports shows the basic components of a hydrogen dispensing station in a simple schematic drawing; the permits and approvals that would typically be required for the construction and operation of a hydrogen dispensing station; and a basic permit that might be employed by an Authority Having Jurisdiction (AHJ).
Code of Federal Regulations, 2010 CFR
2010-01-01
... storage of spent fuel for the nuclear power plant within the scope of the generic determination in § 51.23..., and 51.73. The contribution of the environmental effects of the uranium fuel cycle activities....71, 51.72, 51.73, and this section. The contribution of the environmental effects of the uranium fuel...
Hualapai Wind Project Feasibility Report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Davidson, Kevin; Randall, Mark; Isham, Tom
The Hualapai Department of Planning and Economic Development, with funding assistance from the U.S. Department of Energy, Tribal Energy Program, with the aid of six consultants has completed the four key prerequisites as follows: 1. Identify the site area for development and its suitability for construction. 2. Determine the wind resource potential for the identified site area. 3. Determine the electrical transmission and interconnection feasibility to get the electrical power produced to the marketplace. 4. Complete an initial permitting and environmental assessment to determine the feasibility for getting the project permitted. Those studies indicated a suitable wind resource and favorablemore » conditions for permitting and construction. The permitting and environmental study did not reveal any fatal flaws. A review of the best power sale opportunities indicate southern California has the highest potential for obtaining a PPA that may make the project viable. Based on these results, the recommendation is for the Hualapai Tribal Nation to move forward with attracting a qualified wind developer to work with the Tribe to move the project into the second phase - determining the reality factors for developing a wind project. a qualified developer will bid to a utility or negotiate a PPA to make the project viable for financing.« less
Repository Planning, Design, and Engineering: Part II-Equipment and Costing.
Baird, Phillip M; Gunter, Elaine W
2016-08-01
Part II of this article discusses and provides guidance on the equipment and systems necessary to operate a repository. The various types of storage equipment and monitoring and support systems are presented in detail. While the material focuses on the large repository, the requirements for a small-scale startup are also presented. Cost estimates and a cost model for establishing a repository are presented. The cost model presents an expected range of acquisition costs for the large capital items in developing a repository. A range of 5,000-7,000 ft(2) constructed has been assumed, with 50 frozen storage units, to reflect a successful operation with growth potential. No design or engineering costs, permit or regulatory costs, or smaller items such as the computers, software, furniture, phones, and barcode readers required for operations have been included.
NASA Technical Reports Server (NTRS)
Spencer, Dwight C.
1996-01-01
Hoover et. al. built and tested two imaging Schwarzschild multilayer microscopes. These instruments were constructed as prototypes for the "Water Window Imaging X-Ray Microscope," which is a doubly reflecting, multilayer x-ray microscope configured to operate within the "water window." The "water window" is the narrow region of the x-ray spectrum between the K absorption edges of oxygen (lamda = 23.3 Angstroms) and of carbon (lamda = 43.62 Angstroms), where water is relatively highly transmissive and carbon is highly absorptive. This property of these materials, thus permits the use of high resolution multilayer x-ray microscopes for producing high contrast images of carbon-based structures within the aqueous physiological environments of living cells. We report the design, fabrication and testing of multilayer optics that operate in this regime.
Methods for generating or increasing revenues from crops
Copenhaver, Gregory P.; Keith, Kevin; Preuss, Daphne
2007-03-20
The present invention provides methods of doing business and providing services. For example, methods of increasing the revenue of crops are provided. To this end, the method includes the use of a nucleic acid sequences of plant centromeres. This will permit construction of stably inherited recombinant DNA constructs and mini chromosomes which can serve as vectors for the construction of transgenic plant and animal cells.
Code of Federal Regulations, 2010 CFR
2010-07-01
... interests of the United States. Permits for such road construction or use will be non-exclusive and will be... States and administered by the Forest Service. (a) Permission to construct or use roads across lands and... benefit is needed by the United States, permission to construct or use a road across lands and across...
Purdue University National Biomedical Tracer Facility: Project definition phase. Final report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Green, M.A.
The proposed National Biomedical Tracer Facility (NBTF) will house a high-current accelerator dedicated to production of short-lived radionuclides for biomedical and scientific research. The NBTF will play a vital role in repairing and maintaining the United States` research infrastructure for generation of essential accelerator-based radioisotopes. If properly designed and managed, the NBTF should also achieve international recognition as a Center-of-Excellence for research on radioisotope production methods and for associated education and training. The current report documents the results of a DOE-funded NBTF Project Definition Phase study carried out to better define the technical feasibility and projected costs of establishing andmore » operating the NBTF. This report provides an overview of recommended Facility Design and Specifications, including Accelerator Design, Building Design, and the associated Construction Cost Estimates and Schedule. It is recommended that the NBTF be established as an integrated, comprehensive facility for meeting the diverse production, research, and educational missions set forth in previous documents. Based on an analysis of the projected production demands that will be placed on the NBTF, it appears that a 70 MeV, 1 mA, negative ion cyclotron will offer a good balance between production capabilities and the costs of accelerator purchase and operation. A preliminary architectural plan is presented for a facility designed specifically to fulfill the functions of the NBTF in a cost-effective manner. This report also presents a detailed analysis of the Required Federal State, and Local Permits that may be needed to establish the NBTF, along with schedules and cost estimates for obtaining these permits. The Handling, Storage, and Disposal of Radioactive Waste will pose some significant challenges in the operation of the NBTF, but at this stage of planning the associated problems do not appear to be prohibitive.« less
40 CFR 172.26 - EPA review of permits.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 40 Protection of Environment 24 2014-07-01 2014-07-01 false EPA review of permits. 172.26 Section... EXPERIMENTAL USE PERMITS State Issuance of Experimental Use Permits § 172.26 EPA review of permits. (a... designated State agency shall notifiy EPA of the action by forwarding to the appropriate EPA Regional Office...
40 CFR 172.26 - EPA review of permits.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 40 Protection of Environment 25 2012-07-01 2012-07-01 false EPA review of permits. 172.26 Section... EXPERIMENTAL USE PERMITS State Issuance of Experimental Use Permits § 172.26 EPA review of permits. (a... designated State agency shall notifiy EPA of the action by forwarding to the appropriate EPA Regional Office...
40 CFR 172.26 - EPA review of permits.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 40 Protection of Environment 23 2010-07-01 2010-07-01 false EPA review of permits. 172.26 Section... EXPERIMENTAL USE PERMITS State Issuance of Experimental Use Permits § 172.26 EPA review of permits. (a... designated State agency shall notifiy EPA of the action by forwarding to the appropriate EPA Regional Office...
40 CFR 172.26 - EPA review of permits.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 40 Protection of Environment 25 2013-07-01 2013-07-01 false EPA review of permits. 172.26 Section... EXPERIMENTAL USE PERMITS State Issuance of Experimental Use Permits § 172.26 EPA review of permits. (a... designated State agency shall notifiy EPA of the action by forwarding to the appropriate EPA Regional Office...
40 CFR 172.26 - EPA review of permits.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 40 Protection of Environment 24 2011-07-01 2011-07-01 false EPA review of permits. 172.26 Section... EXPERIMENTAL USE PERMITS State Issuance of Experimental Use Permits § 172.26 EPA review of permits. (a... designated State agency shall notifiy EPA of the action by forwarding to the appropriate EPA Regional Office...
43 CFR 420.24 - Permits for organized events.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 43 Public Lands: Interior 1 2011-10-01 2011-10-01 false Permits for organized events. 420.24..., DEPARTMENT OF THE INTERIOR OFF-ROAD VEHICLE USE Designated Areas and Permitted Events § 420.24 Permits for organized events. Regional Directors may issue permits for the operation of off-road vehicles in organized...
43 CFR 420.24 - Permits for organized events.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 43 Public Lands: Interior 1 2013-10-01 2013-10-01 false Permits for organized events. 420.24..., DEPARTMENT OF THE INTERIOR OFF-ROAD VEHICLE USE Designated Areas and Permitted Events § 420.24 Permits for organized events. Regional Directors may issue permits for the operation of off-road vehicles in organized...
43 CFR 420.24 - Permits for organized events.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 43 Public Lands: Interior 1 2012-10-01 2011-10-01 true Permits for organized events. 420.24..., DEPARTMENT OF THE INTERIOR OFF-ROAD VEHICLE USE Designated Areas and Permitted Events § 420.24 Permits for organized events. Regional Directors may issue permits for the operation of off-road vehicles in organized...
43 CFR 420.24 - Permits for organized events.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 43 Public Lands: Interior 1 2010-10-01 2010-10-01 false Permits for organized events. 420.24..., DEPARTMENT OF THE INTERIOR OFF-ROAD VEHICLE USE Designated Areas and Permitted Events § 420.24 Permits for organized events. Regional Directors may issue permits for the operation of off-road vehicles in organized...
43 CFR 420.24 - Permits for organized events.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 43 Public Lands: Interior 1 2014-10-01 2014-10-01 false Permits for organized events. 420.24..., DEPARTMENT OF THE INTERIOR OFF-ROAD VEHICLE USE Designated Areas and Permitted Events § 420.24 Permits for organized events. Regional Directors may issue permits for the operation of off-road vehicles in organized...
Safety yoke would protect construction workers from falling
NASA Technical Reports Server (NTRS)
Goforth, O. H.
1967-01-01
Simple dismountable yoke protects construction workers on narrow steel I beams at high levels. The yoke engages the upper flat of the I beam and slides freely along it to permit freedom of movement to the worker while limiting his ability to fall by a harness attached to the yoke.
40 CFR 264.19 - Construction quality assurance program.
Code of Federal Regulations, 2013 CFR
2013-07-01
.... Compliance with the hydraulic conductivity requirements must be verified by using in-situ testing on the... specifications in the permit. The program must be developed and implemented under the direction of a CQA officer... description of how they will be constructed. (2) Identification of key personnel in the development and...
40 CFR 264.19 - Construction quality assurance program.
Code of Federal Regulations, 2010 CFR
2010-07-01
.... Compliance with the hydraulic conductivity requirements must be verified by using in-situ testing on the... specifications in the permit. The program must be developed and implemented under the direction of a CQA officer... description of how they will be constructed. (2) Identification of key personnel in the development and...
Measures for the reduction of sinter formations in tunnels
NASA Astrophysics Data System (ADS)
Harer, Gerhard
2017-09-01
A considerable part of the maintenance costs of tunnel structures is related to the inspection, maintenance and repair of the drainage system. The drainage system of tunnels is frequently clogged with Calcium precipitates. Cleaning and water conditioning are costintensive for operating companies. Apart from the direct costs associated with inspection, maintenance and repair works of the drainage system indirect costs are generated, such as by the blocking of the tunnel while inspection, maintenance or repair or by the reduction of the permitted operation speed. Sintering and clogging of the drainage systems is mainly caused by dissolution of cement minerals in concrete and mortar and/or by inadequate design and construction of the drainage system and/or grubby workmanship. With long-term studies and in-situ experiments in Austria traffic tunnels the specific input factors for sinter mechanism have been identified and appropriate counter measures could be defined. In particular modified mix designs for shotcretes and mortars have proven to bring a significant beneficial effect. By means of constructional measures and by the application of hardness stabilizers a further reduction of hard deposits inside the drainage system is achievable. The paper will deal with the specific aspects and will propose adequate counter measures.
Wisconsin's study of manned Mars missions
NASA Technical Reports Server (NTRS)
1987-01-01
The design group focused on three topics: (1) Extravehicular Activities, (2) Sample Return Missions, and (3) Structural and Construction Considerations of a Manned Mars Habitat. Extravehicular Activities permit a Mars based astronaut to exit the habitat and perform mission activities in the harsh Mars environment. Today's spacesuit gloves are bulky, hard to manipulate and fatiguing. A mechanical assistance mechanism has been developed for the glove that will reduce user fatigue and increase the duration of EVA's. Oxygen supply systems are also being developed for the EVA astronaut. A scuba type system of tanked breathing air proves to be the most efficient system for short duration EVA's. A system that extracts the oxygen from atmospheric carbon dioxide can provide oxygen for long duration FVA's. Sample Return Missions require that samples be taken from several sites. Transportation considerations are addressed and two transportation schemes are proposed. The first scheme involves a lighter than air balloon. This system provides excellent range. The second design is a rover that uses tracks rather than wheels. Track rovers perform well in soft, sandy conditions. Engineering aspects of a habitat and domed greenhouse were investigated and plans for the habitat have been made. A configuration has been established and construction details have been made.
1983-09-21
The Department of Health and Human Services (HHS) adds a new section to regulations for making and guaranteeing loans for construction and modernization of hospitals and medical facilities and to regulations for guaranteeing loans for the construction of teaching facilities for health professions personnel. Under these regulations HHS will not approve the modification of the terms of an existing loan guaranteed under Title VI or Title VII of the Public Health Service (PHS) Act if the modification would permit use of the guarantee (or guaranteed loan) as collateral for tax-exempt financing.
Federal Register 2010, 2011, 2012, 2013, 2014
2013-12-04
... Capital Commitment Schedule (``CCS'') interest; (3) NYSE Rule 70.25 to permit d-Quotes to be designated... that MPL Orders may interact with CCS interest; (3) NYSE Rule 70.25 to permit d- Quotes to be... the CCS pursuant to Rule 1000 would not be permitted to be designated as MPL Orders. The CCS is a...
33 CFR 126.19 - Issuance of permits for handling designated dangerous cargo.
Code of Federal Regulations, 2014 CFR
2014-07-01
... designated dangerous cargo. 126.19 Section 126.19 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) WATERFRONT FACILITIES HANDLING OF DANGEROUS CARGO AT WATERFRONT FACILITIES § 126.19 Issuance of permits for handling designated dangerous cargo. Upon the application of the owners...
33 CFR 126.19 - Issuance of permits for handling designated dangerous cargo.
Code of Federal Regulations, 2012 CFR
2012-07-01
... designated dangerous cargo. 126.19 Section 126.19 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) WATERFRONT FACILITIES HANDLING OF DANGEROUS CARGO AT WATERFRONT FACILITIES § 126.19 Issuance of permits for handling designated dangerous cargo. Upon the application of the owners...
33 CFR 126.19 - Issuance of permits for handling designated dangerous cargo.
Code of Federal Regulations, 2011 CFR
2011-07-01
... designated dangerous cargo. 126.19 Section 126.19 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) WATERFRONT FACILITIES HANDLING OF DANGEROUS CARGO AT WATERFRONT FACILITIES § 126.19 Issuance of permits for handling designated dangerous cargo. Upon the application of the owners...
33 CFR 126.19 - Issuance of permits for handling designated dangerous cargo.
Code of Federal Regulations, 2013 CFR
2013-07-01
... designated dangerous cargo. 126.19 Section 126.19 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) WATERFRONT FACILITIES HANDLING OF DANGEROUS CARGO AT WATERFRONT FACILITIES § 126.19 Issuance of permits for handling designated dangerous cargo. Upon the application of the owners...
33 CFR 126.19 - Issuance of permits for handling designated dangerous cargo.
Code of Federal Regulations, 2010 CFR
2010-07-01
... designated dangerous cargo. 126.19 Section 126.19 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) WATERFRONT FACILITIES HANDLING OF DANGEROUS CARGO AT WATERFRONT FACILITIES § 126.19 Issuance of permits for handling designated dangerous cargo. Upon the application of the owners...
75 FR 48672 - Pesticides; Revised Fee Schedule for Registration Applications
Federal Register 2010, 2011, 2012, 2013, 2014
2010-08-11
... follows B772 118 Amend or extend Experimental 3 11,577 Use Permit; minor changes to experimental design...,942 Experimental Use Permit; minor changes to experimental design; extend established temporary... revision of experimental design B780 121 New active ingredient; non- 12 144,704 food/feed; no SAP review...
Electrochemical reduction of carbon dioxide. Final report
DOE Office of Scientific and Technical Information (OSTI.GOV)
LaConti, A.B.; Molter, T.M.; Zagaja, J.A.
1986-05-01
Many researchers have studied the electrochemical reduction of carbon dioxide and related organic species to form concentrated liquid/gaseous products in laboratory-scale hardware. Hamilton Standard has developed a high pressure SPE electrolysis cell capable of reducing carbon dioxide streams to form pure, concentrated alcohols, carboxylic acids, and other hydrocarbons. The process is unique in that the byproducts of reaction include oxygen and, under some test conditions water. In addition, a relatively simple test system was designed and constructed permitting both batch and semibatch type electrochemical reduction studies. In this study, cathode materials were developed which 1) had a characteristic high hydrogenmore » overvoltage, and 2) possessed the intrinsic affinity for electrochemical reduction of the carbon dioxide species. In addition, suitable anode electrocatalyst materials were identified. Studies involving the electrochemical reduction of carbon dioxide required the ability to identify and quantify reaction products obtained during cell evaluation. Gas chromatographic techniques were developed along with the establishment of ion chromatographic methods permitting the analysis of organic reaction products. Hamilton Standard has evaluated electrochemical carbon dioxide reduction cells under a variety of test conditions.« less
Code of Federal Regulations, 2012 CFR
2012-10-01
... permit, display permit, chartering permit, or shark research permit on board the vessel, as specified in... HMS. (36) Fish with bottom or pelagic longline and shark gillnet gear for HMS without adhering to the... the number designated by NMFS, the incidental capture of listed whales with shark gillnet gear as...
This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Petition Database available at www2.epa.gov/title-v-operating-permits/title-v-petition-database. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.
pYEMF, a pUC18-derived XcmI T-vector for efficient cloning of PCR products.
Gu, Jingsong; Ye, Chunjiang
2011-03-01
A 1330-bp DNA sequence with two XcmI cassettes was inserted into pUC18 to construct an efficient XcmI T-vector parent plasmid, pYEMF. The large size of the inserted DNA fragment improved T-vector cleavage efficiency, and guaranteed good separation of the molecular components after restriction digestion. The pYEMF-T-vector generated from parent plasmid pYEMF permits blue/white colony screening; cloning efficiency analysis showed that most white colonies (>75%) were putative transformants which carried the cloning product. The sequence analysis and design approach presented here will facilitate applications in the fields of molecular biology and genetic engineering.
'Invisible' antenna takes up less space
NASA Astrophysics Data System (ADS)
Shelley, M.; Bond, K.
1986-06-01
A compensated microstrip patch design is described that also uses grounded coplanar waveguide to permit a second, independent antenna to be mounted on any type of existing primary radar antenna aboard an aircraft without affecting its radiation. Successful integration of the IFF (identification friend or foe) antenna, which works at D-band, and the primary radar antenna is possible because of the diversity in frequency between the two antennas. Construction of a microstrip radiating element, electromagnetically invisible to the primary antenna, requires orthogonal grating elements and use of the primary antenna as the ground plane. Coplanar mounting of a stripline array with the primary antenna reduces the manufacturing costs and increases the functional performance of the IFF antenna.
10 CFR 50.33 - Contents of applications; general information.
Code of Federal Regulations, 2010 CFR
2010-01-01
.... (e) The class of license applied for, the use to which the facility will be put, the period of time... applicable, the following should be provided: (1) If the application is for a construction permit, the... assurance of obtaining the funds necessary to cover estimated construction costs and related fuel cycle...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-05-28
... consist of up to 32 wind turbines with a generating capacity of 82 megawatts (MW) of electricity. Power generated by the wind turbines would be transmitted to the existing Bonneville Power Administration... conjunction with the construction, operation, maintenance, and decommissioning of the Radar Ridge Wind Project...
47 CFR 73.1692 - Broadcast station construction near or installation on an AM broadcast tower.
Code of Federal Regulations, 2011 CFR
2011-10-01
... the indirect method (see § 73.51). Upon the completion of the installation, antenna impedance... completion of construction, antenna impedance measurements of the AM station shall be made. In addition... simultaneously with the filing of the application for license to cover this permit, the results of the impedance...
47 CFR 73.1692 - Broadcast station construction near or installation on an AM broadcast tower.
Code of Federal Regulations, 2010 CFR
2010-10-01
... the indirect method (see § 73.51). Upon the completion of the installation, antenna impedance... completion of construction, antenna impedance measurements of the AM station shall be made. In addition... simultaneously with the filing of the application for license to cover this permit, the results of the impedance...
47 CFR 25.113 - Station licenses and launch authority.
Code of Federal Regulations, 2011 CFR
2011-10-01
.... Construction of such stations may commence prior to grant of a license at the applicant's own risk. Applicants... FCC Antenna Structure Registration Number(s) for the affected structure(s). If no such number has been... for the antenna structure in question. (f) Construction permits are not required for U.S.-licensed...
47 CFR 25.113 - Station licenses and launch authority.
Code of Federal Regulations, 2010 CFR
2010-10-01
.... Construction of such stations may commence prior to grant of a license at the applicant's own risk. Applicants... FCC Antenna Structure Registration Number(s) for the affected structure(s). If no such number has been... for the antenna structure in question. (f) Construction permits are not required for U.S.-licensed...
47 CFR 25.113 - Station licenses and launch authority.
Code of Federal Regulations, 2013 CFR
2013-10-01
... is required by part 17 of this chapter, must include the FCC Antenna Structure Registration Number(s) for the affected structure(s). If no such number has been assigned at the time the application is...) Construction permits are not required for U.S.-licensed space stations. Construction of such stations may...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-03-23
... facilities and roads; construction of new public facilities (approximately 1,400 acres of the ground-disturbance total); and construction, operation, and maintenance of renewable energy projects, including solar... Supervisor, Ventura Fish and Wildlife Office, U.S. Fish and Wildlife Service, 2493 Portola Road, Suite B...
Code of Federal Regulations, 2013 CFR
2013-01-01
... CONSTRUCTION SAFETY TEAMS NATIONAL CONSTRUCTION SAFETY TEAMS Collection and Preservation of Evidence... records with respect to a building failure are located. After the Director establishes and deploys a Team, members of the public are encouraged to voluntarily permit Team members to enter property where building...
Code of Federal Regulations, 2014 CFR
2014-01-01
... CONSTRUCTION SAFETY TEAMS NATIONAL CONSTRUCTION SAFETY TEAMS Collection and Preservation of Evidence... records with respect to a building failure are located. After the Director establishes and deploys a Team, members of the public are encouraged to voluntarily permit Team members to enter property where building...
Code of Federal Regulations, 2010 CFR
2010-01-01
... CONSTRUCTION SAFETY TEAMS NATIONAL CONSTRUCTION SAFETY TEAMS Collection and Preservation of Evidence... records with respect to a building failure are located. After the Director establishes and deploys a Team, members of the public are encouraged to voluntarily permit Team members to enter property where building...
Code of Federal Regulations, 2011 CFR
2011-01-01
... CONSTRUCTION SAFETY TEAMS NATIONAL CONSTRUCTION SAFETY TEAMS Collection and Preservation of Evidence... records with respect to a building failure are located. After the Director establishes and deploys a Team, members of the public are encouraged to voluntarily permit Team members to enter property where building...
Code of Federal Regulations, 2012 CFR
2012-01-01
... CONSTRUCTION SAFETY TEAMS NATIONAL CONSTRUCTION SAFETY TEAMS Collection and Preservation of Evidence... records with respect to a building failure are located. After the Director establishes and deploys a Team, members of the public are encouraged to voluntarily permit Team members to enter property where building...
FY06 L2C2 HE program report Zaug et al.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Zaug, J M; Crowhurst, J C; Howard, W M
2008-08-01
The purpose of this project is to advance the improvement of LLNL thermochemical computational models that form the underlying basis or input for laboratory hydrodynamic simulations. Our general work approach utilizes, by design, tight experimental-theoretical research interactions that allow us to not empirically, but rather more scientifically improve LLNL computational results. The ultimate goal here is to confidently predict through computer models, the performance and safety parameters of currently maintained, modified, and newly designed stockpile systems. To attain our goal we make relevant experimental measurements on candidate detonation products constrained under static high-pressure and temperature conditions. The reduced information frommore » these measurements is then used to construct analytical forms that describe the potential surface (repulsive energy as a function of interatomic separation distance) of single and mixed fluid or detonation product species. These potential surface shapes are also constructed using input from well-trusted shock wave physics and assorted thermodynamic data available in the open literature. Our potential surfaces permit one to determine the equations of state (P,V,T), the equilibrium chemistry, phase, and chemical interactions of detonation products under a very wide range of extreme pressure temperature conditions. Using our foundation of experimentally refined potential surfaces we are in a position to calculate, with confidence, the energetic output and chemical speciation occurring from a specific combustion and/or detonation reaction. The thermochemical model we developed and use for calculating the equilibrium chemistry, kinetics, and energy from ultrafast processes is named 'Cheetah'. Computational results from our Cheetah code are coupled to laboratory ALE3D hydrodynamic simulation codes where the complete response behavior of an existing or proposed system is ultimately predicted. The Cheetah thermochemical code is also used by well over 500 U.S. government DoD and DOE community users who calculate the chemical properties of detonated high explosives, propellants, and pyrotechnics. To satisfy the growing needs of LLNL and the general user community we continue to improve the robustness of our Cheetah code. The P-T range of current speed of sound experiments will soon be extended by a factor of four and our recently developed technological advancements permit us to, for the first time, study any chemical specie or fluid mixture. New experiments will focus on determining the miscibility or coexistence curves of detonation product mixtures. Our newly constructed ultrafast laser diagnostics will permit us to determine what chemical species exist under conditions approaching Chapman-Jouguet (CJ) detonation states. Furthermore we will measure the time evolution of candidate species and use our chemical kinetics data to develop new and validate existing rate laws employed in future versions of our Cheetah thermochemical code.« less
Federal Register 2010, 2011, 2012, 2013, 2014
2012-02-07
... Elimination System (NPDES) General Permit for Discharges From Concentrated Animal Feeding Operations (CAFOs... permit for discharges from eligible owners/operators of concentrated animal feeding operations (CAFOs... of the final permit, animal feeding operations that are defined as CAFOs or designated as CAFOs by...
The Lean in Air Permitting Guide is designed to help air program managers at public agencies better understand the potential value and results that can be achieved by applying Lean improvement methods to air permitting processes.