Sample records for design process management

  1. The Design and Management of an Organisation's Lifelong Learning Curriculum

    ERIC Educational Resources Information Center

    Dealtry, Richard

    2009-01-01

    Purpose: The purpose of this paper is to examine the successful design and management of high performance work-based lifelong learning processes. Design: The paper summarises the process management practices and contextual parameters that are being applied in the successful design and management of high performance work based lifelong learning…

  2. Operational concepts and implementation strategies for the design configuration management process.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Trauth, Sharon Lee

    2007-05-01

    This report describes operational concepts and implementation strategies for the Design Configuration Management Process (DCMP). It presents a process-based systems engineering model for the successful configuration management of the products generated during the operation of the design organization as a business entity. The DCMP model focuses on Pro/E and associated activities and information. It can serve as the framework for interconnecting all essential aspects of the product design business. A design operation scenario offers a sense of how to do business at a time when DCMP is second nature within the design organization.

  3. Design of distributed systems of hydrolithosphere processes management. A synthesis of distributed management systems

    NASA Astrophysics Data System (ADS)

    Pershin, I. M.; Pervukhin, D. A.; Ilyushin, Y. V.; Afanaseva, O. V.

    2017-10-01

    The paper considers an important problem of designing distributed systems of hydrolithosphere processes management. The control actions on the hydrolithosphere processes under consideration are implemented by a set of extractive wells. The article shows the method of defining the approximation links for description of the dynamic characteristics of hydrolithosphere processes. The structure of distributed regulators, used in the management systems by the considered processes, is presented. The paper analyses the results of the synthesis of the distributed management system and the results of modelling the closed-loop control system by the parameters of the hydrolithosphere process.

  4. Managing Analysis Models in the Design Process

    NASA Technical Reports Server (NTRS)

    Briggs, Clark

    2006-01-01

    Design of large, complex space systems depends on significant model-based support for exploration of the design space. Integrated models predict system performance in mission-relevant terms given design descriptions and multiple physics-based numerical models. Both the design activities and the modeling activities warrant explicit process definitions and active process management to protect the project from excessive risk. Software and systems engineering processes have been formalized and similar formal process activities are under development for design engineering and integrated modeling. JPL is establishing a modeling process to define development and application of such system-level models.

  5. Knowledge Management in Instructional Design. ERIC Digest.

    ERIC Educational Resources Information Center

    Spector, J. Michael; Edmonds, Gerald S.

    This digest reviews what instructional designers do, describes knowledge management, and indicates how knowledge management is influencing instructional design. The first section defines instructional design (ID) and briefly describes the ID process. The second section covers knowledge management (KM), including definitions of KM and systems,…

  6. Design of distributed systems of hydrolithospere processes management. Selection of optimal number of extracting wells

    NASA Astrophysics Data System (ADS)

    Pershin, I. M.; Pervukhin, D. A.; Ilyushin, Y. V.; Afanaseva, O. V.

    2017-10-01

    The article considers the important issue of designing the distributed systems of hydrolithospere processes management. Control effects on the hydrolithospere processes are implemented by a set of extractive wells. The article shows how to determine the optimal number of extractive wells that provide a distributed control impact on the management object.

  7. Integrating a Genetic Algorithm Into a Knowledge-Based System for Ordering Complex Design Processes

    NASA Technical Reports Server (NTRS)

    Rogers, James L.; McCulley, Collin M.; Bloebaum, Christina L.

    1996-01-01

    The design cycle associated with large engineering systems requires an initial decomposition of the complex system into design processes which are coupled through the transference of output data. Some of these design processes may be grouped into iterative subcycles. In analyzing or optimizing such a coupled system, it is essential to be able to determine the best ordering of the processes within these subcycles to reduce design cycle time and cost. Many decomposition approaches assume the capability is available to determine what design processes and couplings exist and what order of execution will be imposed during the design cycle. Unfortunately, this is often a complex problem and beyond the capabilities of a human design manager. A new feature, a genetic algorithm, has been added to DeMAID (Design Manager's Aid for Intelligent Decomposition) to allow the design manager to rapidly examine many different combinations of ordering processes in an iterative subcycle and to optimize the ordering based on cost, time, and iteration requirements. Two sample test cases are presented to show the effects of optimizing the ordering with a genetic algorithm.

  8. Theory and Practice Meets in Industrial Process Design -Educational Perspective-

    NASA Astrophysics Data System (ADS)

    Aramo-Immonen, Heli; Toikka, Tarja

    Software engineer should see himself as a business process designer in enterprise resource planning system (ERP) re-engineering project. Software engineers and managers should have design dialogue. The objective of this paper is to discuss the motives to study the design research in connection of management education in order to envision and understand the soft human issues in the management context. Second goal is to develop means of practicing social skills between designers and managers. This article explores the affective components of design thinking in industrial management domain. In the conceptual part of this paper are discussed concepts of network and project economy, creativity, communication, use of metaphors, and design thinking. Finally is introduced empirical research plan and first empirical results from design method experiments among the multi-disciplined groups of the master-level students of industrial engineering and management and software engineering.

  9. Efficiency improvement of technological preparation of power equipment manufacturing

    NASA Astrophysics Data System (ADS)

    Milukov, I. A.; Rogalev, A. N.; Sokolov, V. P.; Shevchenko, I. V.

    2017-11-01

    Competitiveness of power equipment primarily depends on speeding-up the development and mastering of new equipment samples and technologies, enhancement of organisation and management of design, manufacturing and operation. Actual political, technological and economic conditions cause the acute need in changing the strategy and tactics of process planning. At that the issues of maintenance of equipment with simultaneous improvement of its efficiency and compatibility to domestically produced components are considering. In order to solve these problems, using the systems of computer-aided process planning for process design at all stages of power equipment life cycle is economically viable. Computer-aided process planning is developed for the purpose of improvement of process planning by using mathematical methods and optimisation of design and management processes on the basis of CALS technologies, which allows for simultaneous process design, process planning organisation and management based on mathematical and physical modelling of interrelated design objects and production system. An integration of computer-aided systems providing the interaction of informative and material processes at all stages of product life cycle is proposed as effective solution to the challenges in new equipment design and process planning.

  10. DeMAID/GA an Enhanced Design Manager's Aid for Intelligent Decomposition

    NASA Technical Reports Server (NTRS)

    Rogers, J. L.

    1996-01-01

    Many companies are looking for new tools and techniques to aid a design manager in making decisions that can reduce the time and cost of a design cycle. One tool is the Design Manager's Aid for Intelligent Decomposition (DeMAID). Since the initial public release of DeMAID in 1989, much research has been done in the areas of decomposition, concurrent engineering, parallel processing, and process management; many new tools and techniques have emerged. Based on these recent research and development efforts, numerous enhancements have been added to DeMAID to further aid the design manager in saving both cost and time in a design cycle. The key enhancement, a genetic algorithm (GA), will be available in the next public release called DeMAID/GA. The GA sequences the design processes to minimize the cost and time in converging a solution. The major enhancements in the upgrade of DeMAID to DeMAID/GA are discussed in this paper. A sample conceptual design project is used to show how these enhancements can be applied to improve the design cycle.

  11. A methodological framework to support the initiation, design and institutionalization of participatory modeling processes in water resources management

    NASA Astrophysics Data System (ADS)

    Halbe, Johannes; Pahl-Wostl, Claudia; Adamowski, Jan

    2018-01-01

    Multiple barriers constrain the widespread application of participatory methods in water management, including the more technical focus of most water agencies, additional cost and time requirements for stakeholder involvement, as well as institutional structures that impede collaborative management. This paper presents a stepwise methodological framework that addresses the challenges of context-sensitive initiation, design and institutionalization of participatory modeling processes. The methodological framework consists of five successive stages: (1) problem framing and stakeholder analysis, (2) process design, (3) individual modeling, (4) group model building, and (5) institutionalized participatory modeling. The Management and Transition Framework is used for problem diagnosis (Stage One), context-sensitive process design (Stage Two) and analysis of requirements for the institutionalization of participatory water management (Stage Five). Conceptual modeling is used to initiate participatory modeling processes (Stage Three) and ensure a high compatibility with quantitative modeling approaches (Stage Four). This paper describes the proposed participatory model building (PMB) framework and provides a case study of its application in Québec, Canada. The results of the Québec study demonstrate the applicability of the PMB framework for initiating and designing participatory model building processes and analyzing barriers towards institutionalization.

  12. A support architecture for reliable distributed computing systems

    NASA Technical Reports Server (NTRS)

    Mckendry, Martin S.

    1986-01-01

    The Clouds kernel design was through several design phases and is nearly complete. The object manager, the process manager, the storage manager, the communications manager, and the actions manager are examined.

  13. Using Agile Project Management to Enhance the Performance of Instructional Design Teams

    ERIC Educational Resources Information Center

    Sweeney, David S.; Cifuentes, Lauren

    2010-01-01

    Instructional design models describe in detail methodologies for designing effective instruction. Several widely adopted models include suggestions for managing instructional design projects. However, these suggestions focus on how to manage the instructional design steps rather than the instructional design and development team process. The…

  14. Development of integrated programs for Aerospace-vehicle Design (IPAD): Product program management systems

    NASA Technical Reports Server (NTRS)

    Isenberg, J. M.; Southall, J. W.

    1979-01-01

    The Integrated Programs for Aerospace Vehicle Design (IPAD) is a computing system to support company-wide design information processing. This document presents a brief description of the management system used to direct and control a product-oriented program. This document, together with the reference design process (CR 2981) and the manufacture interactions with the design process (CR 2982), comprises the reference information that forms the basis for specifying IPAD system requirements.

  15. Model medication management process in Australian nursing homes using business process modeling.

    PubMed

    Qian, Siyu; Yu, Ping

    2013-01-01

    One of the reasons for end user avoidance or rejection to use health information systems is poor alignment of the system with healthcare workflow, likely causing by system designers' lack of thorough understanding about healthcare process. Therefore, understanding the healthcare workflow is the essential first step for the design of optimal technologies that will enable care staff to complete the intended tasks faster and better. The often use of multiple or "high risk" medicines by older people in nursing homes has the potential to increase medication error rate. To facilitate the design of information systems with most potential to improve patient safety, this study aims to understand medication management process in nursing homes using business process modeling method. The paper presents study design and preliminary findings from interviewing two registered nurses, who were team leaders in two nursing homes. Although there were subtle differences in medication management between the two homes, major medication management activities were similar. Further field observation will be conducted. Based on the data collected from observations, an as-is process model for medication management will be developed.

  16. Rapid Development: A Content Analysis Comparison of Literature and Purposive Sampling of AFRL Rapid Reaction Projects

    DTIC Science & Technology

    2011-12-01

    systems engineering technical and technical management processes. Technical Planning, Stakeholders Requirements Development, and Architecture Design were...Stakeholder Requirements Definition, Architecture Design and Technical Planning. A purposive sampling of AFRL rapid development program managers and engineers...emphasize one process over another however Architecture Design , Implementation scored higher among Technical Processes. Decision Analysis, Technical

  17. [A design of software for management of hospital equipment maintenance process].

    PubMed

    Xie, Haiyuan; Liu, Yiqing

    2010-03-01

    According to the circumstance of hospital equipment maintenance, we designed a computer program for management of hospital equipment maintenance process by Java programming language. This program can control the maintenance process, increase the efficiency; and be able to fix the equipment location.

  18. Reinventing The Design Process: Teams and Models

    NASA Technical Reports Server (NTRS)

    Wall, Stephen D.

    1999-01-01

    The future of space mission designing will be dramatically different from the past. Formerly, performance-driven paradigms emphasized data return with cost and schedule being secondary issues. Now and in the future, costs are capped and schedules fixed-these two variables must be treated as independent in the design process. Accordingly, JPL has redesigned its design process. At the conceptual level, design times have been reduced by properly defining the required design depth, improving the linkages between tools, and managing team dynamics. In implementation-phase design, system requirements will be held in crosscutting models, linked to subsystem design tools through a central database that captures the design and supplies needed configuration management and control. Mission goals will then be captured in timelining software that drives the models, testing their capability to execute the goals. Metrics are used to measure and control both processes and to ensure that design parameters converge through the design process within schedule constraints. This methodology manages margins controlled by acceptable risk levels. Thus, teams can evolve risk tolerance (and cost) as they would any engineering parameter. This new approach allows more design freedom for a longer time, which tends to encourage revolutionary and unexpected improvements in design.

  19. The Design, Development and Testing of Complex Avionics Systems: Conference Proceedings Held at the Avionics Panel Symposium in Las Vegas, Nevada on 27 April-1 May 1987

    DTIC Science & Technology

    1987-12-01

    Normally, the system is decomposed into manageable parts with accurately defined interfaces. By rigidly controlling this process, aerospace companies have...Reference A CHANGE IN SYSTEM DESIGN EMPHASIS: FROM MACHINE TO MAN by M.L.Metersky and J.L.Ryder 16 SESSION I1 - MANAGING THE FUl URE SYSTEM DESIGN...PROCESS MANAGING ADVANCED AVIONIC SYSTEM DESIGN by P.Simons 17 ERGONOMIE PSYCHOSENSORIELLE DES COCKPITS, INTERET DES SYSTEMES INFORMATIQUES INTELLIGENTS

  20. Process models as tools in forestry research and management

    Treesearch

    Kurt Johnsen; Lisa Samuelson; Robert Teskey; Steve McNulty; Tom Fox

    2001-01-01

    Forest process models are mathematical representations of biological systems that incorporate our understanding of physiological and ecological mechanisms into predictive algorithms. These models were originally designed and used for research purposes, but are being developed for use in practical forest management. Process models designed for research...

  1. Applied Integrated Design in Composite UAV Development

    NASA Astrophysics Data System (ADS)

    Vasić, Zoran; Maksimović, Stevan; Georgijević, Dragutin

    2018-04-01

    This paper presents a modern approach to integrated development of Unmanned Aerial Vehicle made of laminated composite materials from conceptual design, through detail design, strength and stiffness analyses, definition and management of design and production data, detailed tests results and other activities related to development of laminated composite structures with main of its particularities in comparison to metal structures. Special attention in this work is focused to management processes of product data during life cycle of an UAV and experimental tests of its composite wing. Experience shows that the automation management processes of product data during life cycle, as well as processes of manufacturing, are inevitable if a company wants to get cheaper and quality composite aircraft structures. One of the most effective ways of successful management of product data today is Product Life cycle Management (PLM). In terms of the PLM, a spectrum of special measures and provisions has to be implemented when defining fiber-reinforced composite material structures in comparison to designing with metals which is elaborated in the paper.

  2. A Design Support Framework through Dynamic Deployment of Hypothesis and Verification in the Design Process

    NASA Astrophysics Data System (ADS)

    Nomaguch, Yutaka; Fujita, Kikuo

    This paper proposes a design support framework, named DRIFT (Design Rationale Integration Framework of Three layers), which dynamically captures and manages hypothesis and verification in the design process. A core of DRIFT is a three-layered design process model of action, model operation and argumentation. This model integrates various design support tools and captures design operations performed on them. Action level captures the sequence of design operations. Model operation level captures the transition of design states, which records a design snapshot over design tools. Argumentation level captures the process of setting problems and alternatives. The linkage of three levels enables to automatically and efficiently capture and manage iterative hypothesis and verification processes through design operations over design tools. In DRIFT, such a linkage is extracted through the templates of design operations, which are extracted from the patterns embeded in design tools such as Design-For-X (DFX) approaches, and design tools are integrated through ontology-based representation of design concepts. An argumentation model, gIBIS (graphical Issue-Based Information System), is used for representing dependencies among problems and alternatives. A mechanism of TMS (Truth Maintenance System) is used for managing multiple hypothetical design stages. This paper also demonstrates a prototype implementation of DRIFT and its application to a simple design problem. Further, it is concluded with discussion of some future issues.

  3. Model of Values-Based Management Process in Schools: A Mixed Design Study

    ERIC Educational Resources Information Center

    Dogan, Soner

    2016-01-01

    The aim of this paper is to evaluate the school administrators' values-based management behaviours according to the teachers' perceptions and opinions and, accordingly, to build a model of values-based management process in schools. The study was conducted using explanatory design which is inclusive of both quantitative and qualitative methods.…

  4. PMIS Project. Planning & Management Information System. A Project To Develop a Data Processing System for Support of the Planning and Management Needs of Local School Districts. Final Report, Year 2.

    ERIC Educational Resources Information Center

    Council of the Great City Schools, Washington, DC.

    This document examines the design and structure of PMIS (Planning and Management Information System), an information system that supports the decisionmaking process of executive management in local school districts. The system is designed around a comprehensive, longitudinal, and interrelated data base. It utilizes a powerful real-time,…

  5. Requirements for company-wide management

    NASA Technical Reports Server (NTRS)

    Southall, J. W.

    1980-01-01

    Computing system requirements were developed for company-wide management of information and computer programs in an engineering data processing environment. The requirements are essential to the successful implementation of a computer-based engineering data management system; they exceed the capabilities provided by the commercially available data base management systems. These requirements were derived from a study entitled The Design Process, which was prepared by design engineers experienced in development of aerospace products.

  6. Development of Integrated Programs for Aerospace-vehicle design (IPAD): Integrated information processing requirements

    NASA Technical Reports Server (NTRS)

    Southall, J. W.

    1979-01-01

    The engineering-specified requirements for integrated information processing by means of the Integrated Programs for Aerospace-Vehicle Design (IPAD) system are presented. A data model is described and is based on the design process of a typical aerospace vehicle. General data management requirements are specified for data storage, retrieval, generation, communication, and maintenance. Information management requirements are specified for a two-component data model. In the general portion, data sets are managed as entities, and in the specific portion, data elements and the relationships between elements are managed by the system, allowing user access to individual elements for the purpose of query. Computer program management requirements are specified for support of a computer program library, control of computer programs, and installation of computer programs into IPAD.

  7. Advanced data management design for autonomous telerobotic systems in space using spaceborne symbolic processors

    NASA Technical Reports Server (NTRS)

    Goforth, Andre

    1987-01-01

    The use of computers in autonomous telerobots is reaching the point where advanced distributed processing concepts and techniques are needed to support the functioning of Space Station era telerobotic systems. Three major issues that have impact on the design of data management functions in a telerobot are covered. It also presents a design concept that incorporates an intelligent systems manager (ISM) running on a spaceborne symbolic processor (SSP), to address these issues. The first issue is the support of a system-wide control architecture or control philosophy. Salient features of two candidates are presented that impose constraints on data management design. The second issue is the role of data management in terms of system integration. This referes to providing shared or coordinated data processing and storage resources to a variety of telerobotic components such as vision, mechanical sensing, real-time coordinated multiple limb and end effector control, and planning and reasoning. The third issue is hardware that supports symbolic processing in conjunction with standard data I/O and numeric processing. A SSP that currently is seen to be technologically feasible and is being developed is described and used as a baseline in the design concept.

  8. Research on Design Information Management System for Leather Goods

    NASA Astrophysics Data System (ADS)

    Lu, Lei; Peng, Wen-li

    The idea of setting up a design information management system of leather goods was put forward to solve the problems existed in current information management of leather goods. Working principles of the design information management system for leather goods were analyzed in detail. Firstly, the acquiring approach of design information of leather goods was introduced. Secondly, the processing methods of design information were introduced. Thirdly, the management of design information in database was studied. Finally, the application of the system was discussed by taking the shoes products as an example.

  9. Climbing The Knowledge Mountain - The New Solids Processing Design And Management Manual (Presentation)

    EPA Science Inventory

    The USEPA, Water Environment Federation (WEF) and Water Environment Research Foundation (WERF), under a Cooperative Research and Development Agreement (CRADA), are undertaking a massive effort to produce a Solids Processing Design and Management Manual (Manual). The Manual, repr...

  10. Climbing The Knowledge Mountain - The New Solids Processing Design And Management Manual

    EPA Science Inventory

    The USEPA, Water Environment Federation (WEF) and Water Environment Research Foundation (WERF), under a Cooperative Research and Development Agreement (CRADA), are undertaking a massive effort to produce a Solids Processing Design and Management Manual (Manual). The Manual, repr...

  11. DREAMS and IMAGE: A Model and Computer Implementation for Concurrent, Life-Cycle Design of Complex Systems

    NASA Technical Reports Server (NTRS)

    Hale, Mark A.; Craig, James I.; Mistree, Farrokh; Schrage, Daniel P.

    1995-01-01

    Computing architectures are being assembled that extend concurrent engineering practices by providing more efficient execution and collaboration on distributed, heterogeneous computing networks. Built on the successes of initial architectures, requirements for a next-generation design computing infrastructure can be developed. These requirements concentrate on those needed by a designer in decision-making processes from product conception to recycling and can be categorized in two areas: design process and design information management. A designer both designs and executes design processes throughout design time to achieve better product and process capabilities while expanding fewer resources. In order to accomplish this, information, or more appropriately design knowledge, needs to be adequately managed during product and process decomposition as well as recomposition. A foundation has been laid that captures these requirements in a design architecture called DREAMS (Developing Robust Engineering Analysis Models and Specifications). In addition, a computing infrastructure, called IMAGE (Intelligent Multidisciplinary Aircraft Generation Environment), is being developed that satisfies design requirements defined in DREAMS and incorporates enabling computational technologies.

  12. The ID Database: Managing the Instructional Development Process

    ERIC Educational Resources Information Center

    Piña, Anthony A.; Sanford, Barry K.

    2017-01-01

    Management is evolving as a foundational domain to the field of instructional design and technology. However, there are few tools dedicated to the management of instructional design and development projects and activities. In this article, we describe the development, features and implementation of an instructional design database--built from a…

  13. Project Management in Instructional Design: ADDIE Is Not Enough

    ERIC Educational Resources Information Center

    Van Rooij, Shahron Williams

    2010-01-01

    In the digital age, instructional designers must possess both a sound instructional design knowledge base and solid project management skills that will enable them to complete courseware projects on time, on budget and in conformance with client expectations. Project management skills include the ability to apply repeatable processes, along with…

  14. Design Thinking in Elementary Students' Collaborative Lamp Designing Process

    ERIC Educational Resources Information Center

    Kangas, Kaiju; Seitamaa-Hakkarainen, Pirita; Hakkarainen, Kai

    2013-01-01

    Design and Technology education is potentially a rich environment for successful learning, if the management of the whole design process is emphasised, and students' design thinking is promoted. The aim of the present study was to unfold the collaborative design process of one team of elementary students, in order to understand their multimodal…

  15. Reducing Design Cycle Time and Cost Through Process Resequencing

    NASA Technical Reports Server (NTRS)

    Rogers, James L.

    2004-01-01

    In today's competitive environment, companies are under enormous pressure to reduce the time and cost of their design cycle. One method for reducing both time and cost is to develop an understanding of the flow of the design processes and the effects of the iterative subcycles that are found in complex design projects. Once these aspects are understood, the design manager can make decisions that take advantage of decomposition, concurrent engineering, and parallel processing techniques to reduce the total time and the total cost of the design cycle. One software tool that can aid in this decision-making process is the Design Manager's Aid for Intelligent Decomposition (DeMAID). The DeMAID software minimizes the feedback couplings that create iterative subcycles, groups processes into iterative subcycles, and decomposes the subcycles into a hierarchical structure. The real benefits of producing the best design in the least time and at a minimum cost are obtained from sequencing the processes in the subcycles.

  16. [A medical consumable material management information system].

    PubMed

    Tang, Guoping; Hu, Liang

    2014-05-01

    Medical consumables material is essential supplies to carry out medical work, which has a wide range of varieties and a large amount of usage. How to manage it feasibly and efficiently that has been a topic of concern to everyone. This article discussed about how to design a medical consumable material management information system that has a set of standardized processes, bring together medical supplies administrator, suppliers and clinical departments. Advanced management mode, enterprise resource planning (ERP) applied to the whole system design process.

  17. A PBOM configuration and management method based on templates

    NASA Astrophysics Data System (ADS)

    Guo, Kai; Qiao, Lihong; Qie, Yifan

    2018-03-01

    The design of Process Bill of Materials (PBOM) holds a hinge position in the process of product development. The requirements of PBOM configuration design and management for complex products are analysed in this paper, which include the reuse technique of configuration procedure and urgent management need of huge quantity of product family PBOM data. Based on the analysis, the function framework of PBOM configuration and management has been established. Configuration templates and modules are defined in the framework to support the customization and the reuse of configuration process. The configuration process of a detection sensor PBOM is shown as an illustration case in the end. The rapid and agile PBOM configuration and management can be achieved utilizing template-based method, which has a vital significance to improve the development efficiency for complex products.

  18. Reengineering a database for clinical trials management: lessons for system architects.

    PubMed

    Brandt, C A; Nadkarni, P; Marenco, L; Karras, B T; Lu, C; Schacter, L; Fisk, J M; Miller, P L

    2000-10-01

    This paper describes the process of enhancing Trial/DB, a database system for clinical studies management. The system's enhancements have been driven by the need to maximize the effectiveness of developer personnel in supporting numerous and diverse users, of study designers in setting up new studies, and of administrators in managing ongoing studies. Trial/DB was originally designed to work over a local area network within a single institution, and basic architectural changes were necessary to make it work over the Internet efficiently as well as securely. Further, as its use spread to diverse communities of users, changes were made to let the processes of study design and project management adapt to the working styles of the principal investigators and administrators for each study. The lessons learned in the process should prove instructive for system architects as well as managers of electronic patient record systems.

  19. Report to the administrator by the NASA Aerospace Safety Advisory Panel on the Skylab program. Volume 1: Summary report. [systems management evaluation and design analysis

    NASA Technical Reports Server (NTRS)

    1973-01-01

    Contractor and NASA technical management for the development and manufacture of the Skylab modules is reviewed with emphasis on the following management controls: configuration and interface management; vendor control; and quality control of workmanship. A review of the modified two-stage Saturn V launch vehicle which focused on modifications to accommodate the Skylab payload; resolution of prior flight anomalies; and changes in personnel and management systems is presented along with an evaluation of the possible age-life and storage problems for the Saturn 1-B launch vehicle. The NASA program management's visibility and control of contractor operations, systems engineering and integration, the review process for the evaluation of design and flight hardware, and the planning process for mission operations are investigated. It is concluded that the technical management system for development and fabrication of the modules, spacecraft, and launch vehicles, the process of design and hardware acceptance reviews, and the risk assessment activities are satisfactory. It is indicated that checkout activity, integrated testing, and preparations for and execution of mission operation require management attention.

  20. OPERATIONS RESEARCH IN THE DESIGN OF MANAGEMENT INFORMATION SYSTEMS

    DTIC Science & Technology

    management information systems is concerned with the identification and detailed specification of the information and data processing...of advanced data processing techniques in management information systems today, the close coordination of operations research and data systems activities has become a practical necessity for the modern business firm.... information systems in which mathematical models are employed as the basis for analysis and systems design. Operations research provides a

  1. Sharing Control, Embracing Collaboration: Cross-Campus Partnerships for Library Website Design and Management

    ERIC Educational Resources Information Center

    Stephenson, Kimberley

    2012-01-01

    Cross-campus collaboration for library website design and management can be challenging, but the process can produce stronger, more attractive, and more usable library websites. Collaborative library website design and management can also lead to new avenues for marketing library tools and services; expert consultation for library technology…

  2. Streamlining the Online Course Development Process by Using Project Management Tools

    ERIC Educational Resources Information Center

    Abdous, M'hammed; He, Wu

    2008-01-01

    Managing the design and production of online courses is challenging. Insufficient instructional design and inefficient management often lead to issues such as poor course quality and course delivery delays. In an effort to facilitate, streamline, and improve the overall design and production of online courses, this article discusses how we…

  3. User-driven product data manager system design

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1995-03-01

    With the infusion of information technologies into product development and production processes, effective management of product data is becoming essential to modern production enterprises. When an enterprise-wide Product Data Manager (PDM) is implemented, PDM designers must satisfy the requirements of individual users with different job functions and requirements, as well as the requirements of the enterprise as a whole. Concern must also be shown for the interrelationships between information, methods for retrieving archival information and integration of the PDM into the product development process. This paper describes a user-driven approach applied to PDM design for an agile manufacturing pilot projectmore » at Sandia National Laboratories that has been successful in achieving a much faster design-to-production process for a precision electro mechanical surety device.« less

  4. Investigating Instructional Design Management and Leadership Competencies--A Delphi Study

    ERIC Educational Resources Information Center

    Gardner, Joel; Chongwony, Lewis; Washington, Tawana

    2018-01-01

    Research in instructional design and educational technology journals typically focuses on the theories, technologies, and processes related to practice of instructional design. There is little research emphasis, however, on leadership and management of instructional design in higher education. Investigating the competencies associated with…

  5. DeMAID/GA USER'S GUIDE Design Manager's Aid for Intelligent Decomposition with a Genetic Algorithm

    NASA Technical Reports Server (NTRS)

    Rogers, James L.

    1996-01-01

    Many companies are looking for new tools and techniques to aid a design manager in making decisions that can reduce the time and cost of a design cycle. One tool that is available to aid in this decision making process is the Design Manager's Aid for Intelligent Decomposition (DeMAID). Since the initial release of DEMAID in 1989, numerous enhancements have been added to aid the design manager in saving both cost and time in a design cycle. The key enhancement is a genetic algorithm (GA) and the enhanced version is called DeMAID/GA. The GA orders the sequence of design processes to minimize the cost and time to converge to a solution. These enhancements as well as the existing features of the original version of DEMAID are described. Two sample problems are used to show how these enhancements can be applied to improve the design cycle. This report serves as a user's guide for DeMAID/GA.

  6. 29 CFR 1910.119 - Process safety management of highly hazardous chemicals.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... complexity of the process will influence the decision as to the appropriate PHA methodology to use. All PHA... process hazard analysis in sufficient detail to support the analysis. (3) Information pertaining to the...) Relief system design and design basis; (E) Ventilation system design; (F) Design codes and standards...

  7. 29 CFR 1910.119 - Process safety management of highly hazardous chemicals.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... complexity of the process will influence the decision as to the appropriate PHA methodology to use. All PHA... process hazard analysis in sufficient detail to support the analysis. (3) Information pertaining to the...) Relief system design and design basis; (E) Ventilation system design; (F) Design codes and standards...

  8. LIFE CYCLE ASSESSMENT IN MANAGEMENT, PRODUCT AND PROCESS DESIGN, AND POLICY DECISION MAKING: A CONFERENCE REPORT

    EPA Science Inventory

    On 24 September 2003, life cycle assessment (LCA) practitioners and decision makers gathered at the InLCA/LCM Conference in Seattle, Washington, USA (see http://www.lcacenter.org/InLCA-LCM03/index.html) to discuss the role of LCA in management, product design, process development...

  9. Life cycle design and design management strategies in fashion apparel manufacturing

    NASA Astrophysics Data System (ADS)

    Tutia, R.; Mendes, FD; Ventura, A.

    2017-10-01

    The generation of solid textile waste in the process of development and clothing production is an error that causes serious damages to the environment and must be minimized. The greatest volume of textile residues is generated by the department of cut, such as textiles parings and snips that are not used in the productive process. (MILAN et al, 2007). One way to conceive new products environmently conscious is turned to the adoption of a methodology based on Life Cycle Design (LCD) and Design Management.

  10. The Design of a Practical Enterprise Safety Management System

    NASA Astrophysics Data System (ADS)

    Gabbar, Hossam A.; Suzuki, Kazuhiko

    This book presents design guidelines and implementation approaches for enterprise safety management system as integrated within enterprise integrated systems. It shows new model-based safety management where process design automation is integrated with enterprise business functions and components. It proposes new system engineering approach addressed to new generation chemical industry. It will help both the undergraduate and professional readers to build basic knowledge about issues and problems of designing practical enterprise safety management system, while presenting in clear way, the system and information engineering practices to design enterprise integrated solution.

  11. General RMP Guidance - Chapter 5: Management System

    EPA Pesticide Factsheets

    If you have at least one Program 2 or Program 3 process, you are required to develop a management system to oversee the implementation of the risk management program elements, and designate responsibility for making process safety a constant priority.

  12. Working on the Boundaries: Philosophies and Practices of the Design Process

    NASA Technical Reports Server (NTRS)

    Ryan, R.; Blair, J.; Townsend, J.; Verderaime, V.

    1996-01-01

    While systems engineering process is a program formal management technique and contractually binding, the design process is the informal practice of achieving the design project requirements throughout all design phases of the systems engineering process. The design process and organization are systems and component dependent. Informal reviews include technical information meetings and concurrent engineering sessions, and formal technical discipline reviews are conducted through the systems engineering process. This paper discusses and references major philosophical principles in the design process, identifies its role in interacting systems and disciplines analyses and integrations, and illustrates the process application in experienced aerostructural designs.

  13. Overview of the Integrated Programs for Aerospace Vehicle Design (IPAD) project

    NASA Technical Reports Server (NTRS)

    Venneri, S. L.

    1983-01-01

    To respond to national needs for improved productivity in engineering design and manufacturing, a NASA supported joint industry/government project is underway denoted Integrated Programs for Aerospace Vehicle Design (IPAD). The objective is to improve engineering productivity through better use of computer technology. It focuses on development of data base management technology and associated software for integrated company wide management of engineering and manufacturing information. Results to date on the IPAD project include an in depth documentation of a representative design process for a large engineering project, the definition and design of computer aided design software needed to support that process, and the release of prototype software to manage engineering information. This paper provides an overview of the IPAD project and summarizes progress to date and future plans.

  14. Configuration and Data Management Process and the System Safety Professional

    NASA Technical Reports Server (NTRS)

    Shivers, Charles Herbert; Parker, Nelson C. (Technical Monitor)

    2001-01-01

    This article presents a discussion of the configuration management (CM) and the Data Management (DM) functions and provides a perspective of the importance of configuration and data management processes to the success of system safety activities. The article addresses the basic requirements of configuration and data management generally based on NASA configuration and data management policies and practices, although the concepts are likely to represent processes of any public or private organization's well-designed configuration and data management program.

  15. How does the context and design of participatory decision-making processes affect their outcomes? Evidence from sustainable land management in global drylands.

    NASA Astrophysics Data System (ADS)

    de Vente, Joris; Reed, Mark; Stringer, Lindsay; Valente, Sandra; Newig, Jens

    2014-05-01

    It is widely accepted that the design of participatory processes in environmental management needs to be adapted to local contexts. Yet, it is not clear which elements of process design are universal, making it difficult to design processes that deliver beneficial outcomes across different contexts. We used empirical evidence to analyse the extent to which context and process design can enable or impede stakeholder participation and facilitate beneficial environmental and social outcomes in a range of decision-making contexts where stakeholders are engaged in environmental management. To explore the role of national-scale context on the outcomes of participatory processes, we interviewed facilitators from a process that was replicated across 13 dryland study sites around the world, which focussed on selecting Sustainable Land Management (SLM) options in close collaboration with stakeholders. To explore the role of process design and local context, we interviewed participants and facilitators in 11 case studies in Spain and Portugal in which different process designs were used. Interview data were analysed using a combination of quantitative and qualitative approaches to characterise relationships between process design, context and process outcomes. The similarity of outcomes across the 13 international study sites suggested that the national socio-cultural context in which a participatory process is conducted has little impact on its outcomes. However, analysis of cases from Spain and Portugal showed that some aspects of local context may affect outcomes. Having said this, factors associated with process design and participant selection played a more significant role in influencing outcomes in both countries. Processes that led to more beneficial outcomes for the environment and/or participants were likely to include: the legitimate representation of stakeholders; professional facilitation including structured methods for eliciting and aggregating information and balancing power dynamics between participants; and the provision of information and decision-making power to all participants. Participatory processes initiated or facilitated by government bodies led to significantly less trust, information gain, learning, and flexible solutions. However, in these processes, decisions were more acceptable to and likely to be implemented by governments and by those who had to apply them on the ground. These findings provide a solid empirical basis for best practice in the design of participatory processes in SLM in a number of contexts internationally, which if followed, increase the likelihood of providing beneficial environmental and social outcomes for those involved.

  16. Aviation Human-in-the-Loop Simulation Studies: Experimental Planning, Design, and Data Management

    DTIC Science & Technology

    2014-01-01

    Aviation Human-in-the-Loop Simulation Studies: Experimental Planning, Design , and Data Management Kevin W. Williams1 Bonny Christopher2 Gena...Simulation Studies: Experimental Planning, Design , and Data Management January 2014 6. Performing Organization Code 7. Author(s) 8. Performing...describe the process by which we designed our human-in-the-loop (HITL) simulation study and the methodology used to collect and analyze the results

  17. SymptomCare@Home: Developing an Integrated Symptom Monitoring and Management System for Outpatients Receiving Chemotherapy.

    PubMed

    Beck, Susan L; Eaton, Linda H; Echeverria, Christina; Mooney, Kathi H

    2017-10-01

    SymptomCare@Home, an integrated symptom monitoring and management system, was designed as part of randomized clinical trials to help patients with cancer who receive chemotherapy in ambulatory clinics and often experience significant symptoms at home. An iterative design process was informed by chronic disease management theory and features of assessment and clinical decision support systems used in other diseases. Key stakeholders participated in the design process: nurse scientists, clinical experts, bioinformatics experts, and computer programmers. Especially important was input from end users, patients, and nurse practitioners participating in a series of studies testing the system. The system includes both a patient and clinician interface and fully integrates two electronic subsystems: a telephone computer-linked interactive voice response system and a Web-based Decision Support-Symptom Management System. Key features include (1) daily symptom monitoring, (2) self-management coaching, (3) alerting, and (4) nurse practitioner follow-up. The nurse practitioner is distinctively positioned to provide assessment, education, support, and pharmacologic and nonpharmacologic interventions to intensify management of poorly controlled symptoms at home. SymptomCare@Home is a model for providing telehealth. The system facilitates using evidence-based guidelines as part of a comprehensive symptom management approach. The design process and system features can be applied to other diseases and conditions.

  18. Decision making for wildfires: A guide for applying a risk management process at the incident level

    Treesearch

    Mary A. Taber; Lisa M. Elenz; Paul G. Langowski

    2013-01-01

    This publication focuses on the thought processes and considerations surrounding a risk management process for decision making on wildfires. The publication introduces a six element risk management cycle designed to encourage sound risk-informed decision making in accordance with Federal wildland fire policy, although the process is equally applicable to non-Federal...

  19. 75 FR 22047 - Intent To Initiate Consultation and Coordinate the National Oceanic and Atmospheric...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-27

    ... purposes and policies of the NMSA (73 FR 53161). The management plan review process occurs concurrently... management plan was written as part of the sanctuary designation process and published in the Final... Environmental Impact Statement under the authority of NEPA (73 FR 53161). The management plan review process is...

  20. Strategic survey framework for the Northwest Forest Plan survey and manage program.

    Treesearch

    Randy Molina; Dan McKenzie; Robin Lesher; Jan Ford; Jim Alegria; Richard Cutler

    2003-01-01

    This document outlines an iterative process for assessing the information needs for all Northwest Forest Plan (NWFP) survey and manage species, designing and implementing strategic surveys (including field surveys and other information-gathering processes), and analyzing that information for use in the NWFP annual species review and adaptive-management processes. The...

  1. Ecological Risk Assessment Guidance for Superfund: Process for Designing and Conducting Ecological Risk Assessments - Interim Final

    EPA Pesticide Factsheets

    This document provides guidance to site managers and Remedial Project Managers who are legally responsible for the management of a site on how to design and conduct technically defensible ecological risk assessments for the Superfund program.

  2. Management Design Theories

    NASA Astrophysics Data System (ADS)

    Pries-Heje, Jan; Baskerville, Richard L.

    This paper elaborates a design science approach for management planning anchored to the concept of a management design theory. Unlike the notions of design theories arising from information systems, management design theories can appear as a system of technological rules, much as a system of hypotheses or propositions can embody scientific theories. The paper illus trates this form of management design theories with three grounded cases. These grounded cases include a software process improvement study, a user involvement study, and an organizational change study. Collectively these studies demonstrate how design theories founded on technological rules can not only improve the design of information systems, but that these concepts have great practical value for improving the framing of strategic organi zational design decisions about such systems. Each case is either grounded in an empirical sense, that is to say, actual practice, or it is grounded to practices described extensively in the practical literature. Such design theories will help managers more easily approach complex, strategic decisions.

  3. Development of Integrated Programs for Aerospace-vehicle design (IPAD): Reference design process

    NASA Technical Reports Server (NTRS)

    Meyer, D. D.

    1979-01-01

    The airplane design process and its interfaces with manufacturing and customer operations are documented to be used as criteria for the development of integrated programs for the analysis, design, and testing of aerospace vehicles. Topics cover: design process management, general purpose support requirements, design networks, and technical program elements. Design activity sequences are given for both supersonic and subsonic commercial transports, naval hydrofoils, and military aircraft.

  4. Understanding human management of automation errors

    PubMed Central

    McBride, Sara E.; Rogers, Wendy A.; Fisk, Arthur D.

    2013-01-01

    Automation has the potential to aid humans with a diverse set of tasks and support overall system performance. Automated systems are not always reliable, and when automation errs, humans must engage in error management, which is the process of detecting, understanding, and correcting errors. However, this process of error management in the context of human-automation interaction is not well understood. Therefore, we conducted a systematic review of the variables that contribute to error management. We examined relevant research in human-automation interaction and human error to identify critical automation, person, task, and emergent variables. We propose a framework for management of automation errors to incorporate and build upon previous models. Further, our analysis highlights variables that may be addressed through design and training to positively influence error management. Additional efforts to understand the error management process will contribute to automation designed and implemented to support safe and effective system performance. PMID:25383042

  5. Understanding human management of automation errors.

    PubMed

    McBride, Sara E; Rogers, Wendy A; Fisk, Arthur D

    2014-01-01

    Automation has the potential to aid humans with a diverse set of tasks and support overall system performance. Automated systems are not always reliable, and when automation errs, humans must engage in error management, which is the process of detecting, understanding, and correcting errors. However, this process of error management in the context of human-automation interaction is not well understood. Therefore, we conducted a systematic review of the variables that contribute to error management. We examined relevant research in human-automation interaction and human error to identify critical automation, person, task, and emergent variables. We propose a framework for management of automation errors to incorporate and build upon previous models. Further, our analysis highlights variables that may be addressed through design and training to positively influence error management. Additional efforts to understand the error management process will contribute to automation designed and implemented to support safe and effective system performance.

  6. Quicker, slicker, and better? An evaluation of a web-based human resource management system

    NASA Astrophysics Data System (ADS)

    Gibb, Stephen; McBride, Andrew

    2001-10-01

    This paper reviews the design and development of a web based Human Resource Management (HRM) system which has as its foundation a 'capability profiler' tool for analysing individual or team roles in organisations. This provides a foundation for managing a set of integrated activities in recruitment and selection, performance and career management, and training and development for individuals, teams, and whole organisations. The challenges of representing and processing information about the human side of organisation encountered in the design and implementation of such systems are evident. There is a combination of legal, practical, technical and philosophical issues to be faced in the processes of defining roles, selecting staff, monitoring and managing the performance of employees in the design and implementation of such systems. The strengths and weaknesses of web based systems in this context are evaluated. This evaluation highlights both the potential, given the evolution of broader Enterprise Resource Planning (ERP) systems and strategies in manufacturing, and concerns about the migration of HRM processes to such systems.

  7. WORKSHOP ON ENVIRONMENTALLY CONSCIOUS CHEMICAL PROCESS DESIGN

    EPA Science Inventory

    To encourage the consideration of environmental issues during chemical process design, the USEPA has developed techniques and software tools to evaluate the relative environmental impact of a chemical process. These techniques and tools aid in the risk management process by focus...

  8. Automating the Air Force Retail-Level Equipment Management Process: An Application of Microcomputer-Based Information Systems Techniques

    DTIC Science & Technology

    1988-09-01

    could use the assistance of a microcomputer-based management information system . However, adequate system design and development requires an in-depth...understanding of the Equipment Management Section and the environment in which it functions were asked and answered. Then, a management information system was...designed, developed, and tested. The management information system is called the Equipment Management Information System (EMIS).

  9. Recommended System Design for the Occupational Health Management Information System (OHMIS). Volume 1.

    DTIC Science & Technology

    1983-04-01

    Management Information System (OHMIS). The system design includes: detailed function data flows for each of the core data processing functions of OHMIS, in the form of input/processing/output algorithms; detailed descriptions of the inputs and outputs; performance specifications of OHMIS; resources required to develop and operate OHMIS (Vol II). In addition, the report provides a summary of the rationale used to develop the recommended system design, a description of the methodology used to develop the recommended system design, and a review of existing

  10. Waste Management Information System (WMIS) User Guide

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    R. E. Broz

    2008-12-22

    This document provides the user of the Waste Management Information System (WMIS) instructions on how to use the WMIS software. WMIS allows users to initiate, track, and close waste packages. The modular design supports integration and utilization of data throuh the various stages of waste management. The phases of the waste management work process include generation, designation, packaging, container management, procurement, storage, treatment, transportation, and disposal.

  11. Evaluating the Facilities Planning, Design, and Construction Department: The Capital Programs Management Audit.

    ERIC Educational Resources Information Center

    Kaiser, Harvey H.; Kirkwood, Dennis M.

    2000-01-01

    Presents a diagnostic model for assessing the state of an institution's capital programs management (CPM) by delineating "work processes" which comprise that function. What capital programs management is, its resources, and its phases and work processes are described, followed by case studies of the CPM Process Model as an assessment tool. (GR)

  12. The methodology of database design in organization management systems

    NASA Astrophysics Data System (ADS)

    Chudinov, I. L.; Osipova, V. V.; Bobrova, Y. V.

    2017-01-01

    The paper describes the unified methodology of database design for management information systems. Designing the conceptual information model for the domain area is the most important and labor-intensive stage in database design. Basing on the proposed integrated approach to design, the conceptual information model, the main principles of developing the relation databases are provided and user’s information needs are considered. According to the methodology, the process of designing the conceptual information model includes three basic stages, which are defined in detail. Finally, the article describes the process of performing the results of analyzing user’s information needs and the rationale for use of classifiers.

  13. ICT and mobile health to improve clinical process delivery. a research project for therapy management process innovation.

    PubMed

    Locatelli, Paolo; Montefusco, Vittorio; Sini, Elena; Restifo, Nicola; Facchini, Roberta; Torresani, Michele

    2013-01-01

    The volume and the complexity of clinical and administrative information make Information and Communication Technologies (ICTs) essential for running and innovating healthcare. This paper tells about a project aimed to design, develop and implement a set of organizational models, acknowledged procedures and ICT tools (Mobile & Wireless solutions and Automatic Identification and Data Capture technologies) to improve actual support, safety, reliability and traceability of a specific therapy management (stem cells). The value of the project is to design a solution based on mobile and identification technology in tight collaboration with physicians and actors involved in the process to ensure usability and effectivenes in process management.

  14. Application of SNMP on CATV

    NASA Astrophysics Data System (ADS)

    Huang, Hong-bin; Liu, Wei-ping; Chen, Shun-er; Zheng, Liming

    2005-02-01

    A new type of CATV network management system developed by universal MCU, which supports SNMP, is proposed in this paper. From the point of view in both hardware and software, the function and method of every modules inside the system, which include communications in the physical layer, protocol process, data process, and etc, are analyzed. In our design, the management system takes IP MAN as data transmission channel and every controlled object in the management structure has a SNMP agent. In the SNMP agent developed, there are four function modules, including physical layer communication module, protocol process module, internal data process module and MIB management module. In the paper, the structure and function of every module are designed and demonstrated while the related hardware circuit, software flow as well as the experimental results are tested. Furthermore, by introducing RTOS into the software programming, the universal MCU procedure can conducts such multi-thread management as fast Ethernet controller driving, TCP/IP process, serial port signal monitoring and so on, which greatly improves efficiency of CPU.

  15. Instructional Design and Project Management: Complementary or Divergent?

    ERIC Educational Resources Information Center

    van Rooij, Shahron Williams

    2011-01-01

    This paper reports the results of a study to identify the extent to which organizations that develop educational/training products are committed to project management, as measured by their project management implementation maturity, as a methodology that is separate and distinct from the processes of instructional design. A Web survey was…

  16. Towards Knowledge Management for Smart Manufacturing.

    PubMed

    Feng, Shaw C; Bernstein, William Z; Hedberg, Thomas; Feeney, Allison Barnard

    2017-09-01

    The need for capturing knowledge in the digital form in design, process planning, production, and inspection has increasingly become an issue in manufacturing industries as the variety and complexity of product lifecycle applications increase. Both knowledge and data need to be well managed for quality assurance, lifecycle-impact assessment, and design improvement. Some technical barriers exist today that inhibit industry from fully utilizing design, planning, processing, and inspection knowledge. The primary barrier is a lack of a well-accepted mechanism that enables users to integrate data and knowledge. This paper prescribes knowledge management to address a lack of mechanisms for integrating, sharing, and updating domain-specific knowledge in smart manufacturing. Aspects of the knowledge constructs include conceptual design, detailed design, process planning, material property, production, and inspection. The main contribution of this paper is to provide a methodology on what knowledge manufacturing organizations access, update, and archive in the context of smart manufacturing. The case study in this paper provides some example knowledge objects to enable smart manufacturing.

  17. Professional commitment to changing chronic illness care: results from disease management programmes.

    PubMed

    Lemmens, Karin; Strating, Mathilde; Huijsman, Robbert; Nieboer, Anna

    2009-08-01

    The aim of this exploratory study was to investigate to what extent primary care professionals are able to change their systems for delivering care to chronic obstructive pulmonary disease (COPD) patients and what professional and organizational factors are associated with the degree of process implementation. Quasi-experimental design with 1 year follow-up after intervention. Three regional COPD management programmes in the Netherlands, in which general practices cooperated with regional hospitals. All participating primary care professionals (n = 52). COPD management programme. Professional commitment, organizational context and degree of process implementation. Professionals significantly changed their systems for delivering care to COPD patients, namely self-management support, decision support, delivery system design and clinical information systems. Associations were found between organizational factors, professional commitment and changes in processes of care. Group culture and professional commitment appeared to be, to a moderate degree, predictors of process implementation. COPD management was effective; all processes improved significantly. Moreover, theoretically expected associations between organizational context and professional factors with the implementation of COPD management were indeed confirmed to some extent. Group culture and professional commitment are important facilitators.

  18. DeMAID: A Design Manager's Aide for Intelligent Decomposition user's guide

    NASA Technical Reports Server (NTRS)

    Rogers, James L.

    1989-01-01

    A design problem is viewed as a complex system divisible into modules. Before the design of a complex system can begin, the couplings among modules and the presence of iterative loops is determined. This is important because the design manager must know how to group the modules into subsystems and how to assign subsystems to design teams so that changes in one subsystem will have predictable effects on other subsystems. Determining these subsystems is not an easy, straightforward process and often important couplings are overlooked. Moreover, the planning task must be repeated as new information become available or as the design specifications change. The purpose of this research is to develop a knowledge-based tool called the Design Manager's Aide for Intelligent Decomposition (DeMAID) to act as an intelligent advisor for the design manager. DeMaid identifies the subsystems of a complex design problem, orders them into a well-structured format, and marks the couplings among the subsystems to facilitate the use of multilevel tools. DeMAID also provides the design manager with the capability of examining the trade-offs between sequential and parallel processing. This type of approach could lead to a substantial savings or organizing and displaying a complex problem as a sequence of subsystems easily divisible among design teams. This report serves as a User's Guide for the program.

  19. David A. Sievers | NREL

    Science.gov Websites

    fermentation and refining process. One of his favorite topics is in the design and commissioning of custom research equipment. His areas of expertise include: Project management Process design, equipment design , and fabrication Instrumentation and controls design and programming Data analysis and presentation

  20. Software design specification. Part 2: Orbital Flight Test (OFT) detailed design specification. Volume 3: Applications. Book 2: System management

    NASA Technical Reports Server (NTRS)

    1979-01-01

    The functions performed by the systems management (SM) application software are described along with the design employed to accomplish these functions. The operational sequences (OPS) control segments and the cyclic processes they control are defined. The SM specialist function control (SPEC) segments and the display controlled 'on-demand' processes that are invoked by either an OPS or SPEC control segment as a direct result of an item entry to a display are included. Each processing element in the SM application is described including an input/output table and a structured control flow diagram. The flow through the module and other information pertinent to that process and its interfaces to other processes are included.

  1. Behavioural Change in Type 1 Diabetes Self-Management: Why and How?

    ERIC Educational Resources Information Center

    Wilson, Valerie L.

    2009-01-01

    Objective: To examine whether the communication process between diabetes health professionals and people intensively self-managing their type 1 diabetes influenced behavioural change. Design: Telephone interviews to provide insight into the communication process and its influence on diabetes intensive self-management behaviour. Setting:…

  2. The Anatomy of Program Design for an On-Line Business Management Course

    ERIC Educational Resources Information Center

    Barger, Bonita

    2008-01-01

    How does one design an on-line course to bridge theory and practice? How can the feedback of on-going stakeholder (student and administration) be incorporated into the design process to enhance quality? This paper presents the theoretical underpinning of designing an on-line management course recognized as best practice for a "well organized…

  3. Liz Torres | NREL

    Science.gov Websites

    of Expertise Customer service Technically savvy Event planning Word processing/desktop publishing Database management Research Interests Website design Database design Computational science Technology Consulting, Westminster, CO (2007-2012) Administrative Assistant, Source One Management, Denver, CO (2005

  4. Design of a Model-Based Online Management Information System for Interlibrary Loan Networks.

    ERIC Educational Resources Information Center

    Rouse, Sandra H.; Rouse, William B.

    1979-01-01

    Discusses the design of a model-based management information system in terms of mathematical/statistical, information processing, and human factors issues and presents a prototype system for interlibrary loan networks. (Author/CWM)

  5. Integration of design information

    NASA Technical Reports Server (NTRS)

    Anderton, G. L.

    1980-01-01

    The overall concepts of the integrated programs for aerospace-vehicle design (IPAD) from the user's viewpoint are discussed. Also a top-level view of what the user requires from such a system is provided, and the interactions between the system and user are described. The four major components discussed are design process; data storage, management and manipulation; user interface; and project management. Although an outgrowth of aerospace production experience, the basic concepts discussed, and especially their emphasis on integration, are considered applicable to all problem solving. Thus, these concepts may offer a broad base for exploitation by industry in general. This is the first in a set of three papers, the other two being Future Integrated Design Process, by D. D. Mayer, and Requirements for Company-Wide Management of Engineering Information, by J. W. Southall. In addition to tying the three together, how project management can be handled in a computing environment and also the user interface needs are discussed in detail.

  6. Procurement of Architectural and Engineering Services for Sustainable Buildings: A Guide for Federal Project Managers

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    2004-06-01

    This guide was prepared to be a resource for federal construction project managers and others who want to integrate the principles of sustainable design into the procurement of professional building design and consulting services. To economize on energy costs and improve the safety, comfort, and health of building occupants, building design teams can incorporate daylighting, energy efficiency, renewable energy, and passive solar design into all projects in which these elements are technically and economically feasible. The information presented here will help project leaders begin the process and manage the inclusion of sustainable design in the procurement process. The section onmore » establishing selection criteria contains key elements to consider before selecting an architectural and engineering (A/E) firm. The section on preparing the statement of work discusses the broad spectrum of sustainable design services that an A/E firm can provide. Several helpful checklists are included.« less

  7. Research and Design of the Three-tier Distributed Network Management System Based on COM / COM + and DNA

    NASA Astrophysics Data System (ADS)

    Liang, Likai; Bi, Yushen

    Considered on the distributed network management system's demand of high distributives, extensibility and reusability, a framework model of Three-tier distributed network management system based on COM/COM+ and DNA is proposed, which adopts software component technology and N-tier application software framework design idea. We also give the concrete design plan of each layer of this model. Finally, we discuss the internal running process of each layer in the distributed network management system's framework model.

  8. SLS Navigation Model-Based Design Approach

    NASA Technical Reports Server (NTRS)

    Oliver, T. Emerson; Anzalone, Evan; Geohagan, Kevin; Bernard, Bill; Park, Thomas

    2018-01-01

    The SLS Program chose to implement a Model-based Design and Model-based Requirements approach for managing component design information and system requirements. This approach differs from previous large-scale design efforts at Marshall Space Flight Center where design documentation alone conveyed information required for vehicle design and analysis and where extensive requirements sets were used to scope and constrain the design. The SLS Navigation Team has been responsible for the Program-controlled Design Math Models (DMMs) which describe and represent the performance of the Inertial Navigation System (INS) and the Rate Gyro Assemblies (RGAs) used by Guidance, Navigation, and Controls (GN&C). The SLS Navigation Team is also responsible for the navigation algorithms. The navigation algorithms are delivered for implementation on the flight hardware as a DMM. For the SLS Block 1-B design, the additional GPS Receiver hardware is managed as a DMM at the vehicle design level. This paper provides a discussion of the processes and methods used to engineer, design, and coordinate engineering trades and performance assessments using SLS practices as applied to the GN&C system, with a particular focus on the Navigation components. These include composing system requirements, requirements verification, model development, model verification and validation, and modeling and analysis approaches. The Model-based Design and Requirements approach does not reduce the effort associated with the design process versus previous processes used at Marshall Space Flight Center. Instead, the approach takes advantage of overlap between the requirements development and management process, and the design and analysis process by efficiently combining the control (i.e. the requirement) and the design mechanisms. The design mechanism is the representation of the component behavior and performance in design and analysis tools. The focus in the early design process shifts from the development and management of design requirements to the development of usable models, model requirements, and model verification and validation efforts. The models themselves are represented in C/C++ code and accompanying data files. Under the idealized process, potential ambiguity in specification is reduced because the model must be implementable versus a requirement which is not necessarily subject to this constraint. Further, the models are shown to emulate the hardware during validation. For models developed by the Navigation Team, a common interface/standalone environment was developed. The common environment allows for easy implementation in design and analysis tools. Mechanisms such as unit test cases ensure implementation as the developer intended. The model verification and validation process provides a very high level of component design insight. The origin and implementation of the SLS variant of Model-based Design is described from the perspective of the SLS Navigation Team. The format of the models and the requirements are described. The Model-based Design approach has many benefits but is not without potential complications. Key lessons learned associated with the implementation of the Model Based Design approach and process from infancy to verification and certification are discussed

  9. Understanding Complexity and Self-Organization in a Defense Program Management Organization (Experimental Design)

    DTIC Science & Technology

    2016-03-18

    SPONSORED REPORT SERIES Understanding Complexity and Self - Organization in a Defense Program Management Organization (Experimental Design...experiment will examine the decision-making process within the program office and the self - organization of key program office personnel based upon formal...and informal communications links. Additionally, we are interested in the effects of this self - organizing process on the organization’s shared

  10. "My Lesson Plan Was Perfect Until I Tried to Teach": Care Ethics into Practice in Classroom Management

    ERIC Educational Resources Information Center

    Rabin, Colette; Smith, Grinell

    2016-01-01

    As teacher educators, the authors developed an assignment focused on care ethics to prepare teacher candidates to design classroom-management procedures aimed at cultivating caring community. The teacher candidates revised traditional classroom-management processes, such as class rules, into cocreated norms. They also designed original management…

  11. Knowledge management system for risk mitigation in supply chain uncertainty: case from automotive battery supply chain

    NASA Astrophysics Data System (ADS)

    Marie, I. A.; Sugiarto, D.; Surjasa, D.; Witonohadi, A.

    2018-01-01

    Automotive battery supply chain include battery manufacturer, sulphuric acid suppliers, polypropylene suppliers, lead suppliers, transportation service providers, warehouses, retailers and even customers. Due to the increasingly dynamic condition of the environment, supply chain actors were required to improve their ability to overcome various uncertainty issues in the environment. This paper aims to describe the process of designing a knowledge management system for risk mitigation in supply chain uncertainty. The design methodology began with the identification of the knowledge needed to solve the problems associated with uncertainty and analysis of system requirements. The design of the knowledge management system was described in the form of a data flow diagram. The results of the study indicated that key knowledge area that needs to be managed were the knowledge to maintain the stability of process in sulphuric acid process and knowledge to overcome the wastes in battery manufacturing process. The system was expected to be a media acquisition, dissemination and storage of knowledge associated with the uncertainty in the battery supply chain and increase the supply chain performance.

  12. Environmental and sustainability ethics in supply chain management.

    PubMed

    Beamon, Benita M

    2005-04-01

    Environmentally Conscious Supply Chain Management (ECSCM refers to the control exerted over all immediate and eventual environmental effects of products and processes associated with converting raw materials into final products. While much work has been done in this area, the focus has traditionally been on either: product recovery (recycling, remanufacturing, or re-use) or the product design function only (e.g., design for environment). Environmental considerations in manufacturing are often viewed as separate from traditional, value-added considerations. However, the case can be made that professional engineers have an ethical responsibility to consider the immediate and eventual environmental impacts of products and processes that they design and/or manage. This paper describes ECSCM as a component of engineering ethics, and highlights the major issues associated with ethical decision-making in supply chain management.

  13. Design, Analysis and User Acceptance of Architectural Design Education in Learning System Based on Knowledge Management Theory

    ERIC Educational Resources Information Center

    Wu, Yun-Wu; Lin, Yu-An; Wen, Ming-Hui; Perng, Yeng-Hong; Hsu, I-Ting

    2016-01-01

    The major purpose of this study is to develop an architectural design knowledge management learning system with corresponding learning activities to help the students have meaningful learning and improve their design capability in their learning process. Firstly, the system can help the students to obtain and share useful knowledge. Secondly,…

  14. Lakes and ponds recreation management: a state-wide application of the visitor impact management process

    Treesearch

    Jerry J. Vaske; Rodney R. Zwick; Maureen P. Donnelly

    1992-01-01

    The Visitor Impact Management (VIM) process is designed to identify unacceptable changes occurring as a result of visitor use and to develop management strategies to keep visitor impacts within acceptable levels. All previous attempts to apply the VIM planning framework have concentrated on specific resources. This paper expands this focus to an entire state. Based on...

  15. A strategic value management approach for energy and maintenance management in a building

    NASA Astrophysics Data System (ADS)

    Nawi, Mohd Nasrun Mohd; Dahlan, Nofri Yenita; Nadarajan, Santhirasegaran

    2015-05-01

    Fragmentation process is always been highlighted by the stakeholders in the construction industry as one of the `critical' issue that diminishing the opportunity for stakeholders that involved during the operation and maintenance stage to influence design decisions. Failure of design professionals to consider how a maintenance contractor or facility manager will construct the design thus results in higher operating cost, wastage, defects during the maintenance and operation process. Moving towards team integration is considered a significant strategy for overcoming the issue. Value Management is a style of management dedicated to guiding people and promoting innovation with the aim to improve overall building performance through structured, team-oriented exercises which make explicit, and appraise subsequent decisions, by reference to the value requirements of the clients. Accordingly, this paper discusses the fragmentation issue in more detail including the definition, causes and effects to the maintenance and operation of building and at the same time will highlighted the potential of VM integrated team approach as a strategic management approach for overcoming that issue. It also explores that the team integration strategy alleviates scheduling problems, delays and disputes during the construction process, and, hence, prevent harming the overall building performance.

  16. A holistic strategy for adaptive land management

    USDA-ARS?s Scientific Manuscript database

    Adaptive management is widely applied to natural resources management. Adaptive management can be generally defined as an iterative decision-making process that incorporates formulation of management objectives, actions designed to address these objectives, monitoring of results, and repeated adapta...

  17. Lean Production as an Innovative Approach to Construction

    NASA Astrophysics Data System (ADS)

    Spišáková, Marcela; Kozlovská, Mária

    2013-06-01

    Lean production presents a new approach to the construction management which has enabled enterprises to attain very high levels of efficiency, competitiveness and flexibility in production systems. Nowadays, a number of industrial processes are managed in accordance with these advanced management principles [1]. The principles of lean production are applied within the integrated design and delivery solutions (IDDS) and prefabricated construction. IDDS uses collaborative work processes and enhanced skills, with integrated data, information, and knowledge management to minimize structural and process inefficiencies and to enhance the value delivered during design, build, and operation, and across projects. Prefabrication presents a one of opportunities for construction methods, which allows the compliance with principles of sustainable design, provides the potential benefits such as faster construction, fewer housing defects, reduction in energy use and waste and elimination of environmental and safety risks. This paper presents the lean production within the IDDS and its potential in the modern prefabrication. There is created a field providing of benefits of lean production in construction industry.

  18. On Intelligent Design and Planning Method of Process Route Based on Gun Breech Machining Process

    NASA Astrophysics Data System (ADS)

    Hongzhi, Zhao; Jian, Zhang

    2018-03-01

    The paper states an approach of intelligent design and planning of process route based on gun breech machining process, against several problems, such as complex machining process of gun breech, tedious route design and long period of its traditional unmanageable process route. Based on gun breech machining process, intelligent design and planning system of process route are developed by virtue of DEST and VC++. The system includes two functional modules--process route intelligent design and its planning. The process route intelligent design module, through the analysis of gun breech machining process, summarizes breech process knowledge so as to complete the design of knowledge base and inference engine. And then gun breech process route intelligently output. On the basis of intelligent route design module, the final process route is made, edited and managed in the process route planning module.

  19. Managing fear in public health campaigns: a theory-based formative evaluation process.

    PubMed

    Cho, Hyunyi; Witte, Kim

    2005-10-01

    The HIV/AIDS infection rate of Ethiopia is one of the world's highest. Prevention campaigns should systematically incorporate and respond to at-risk population's existing beliefs, emotions, and perceived barriers in the message design process to effectively promote behavior change. However, guidelines for conducting formative evaluation that are grounded in proven risk communication theory and empirical data analysis techniques are hard to find. This article provides a five-step formative evaluation process that translates theory and research for developing effective messages for behavior change. Guided by the extended parallel process model, the five-step process helps message designers manage public's fear surrounding issues such as HIV/AIDS. An entertainment education project that used the process to design HIV/AIDS prevention messages for Ethiopian urban youth is reported. Data were collected in five urban regions of Ethiopia and analyzed according to the process to develop key messages for a 26-week radio soap opera.

  20. [Design of medical devices management system supporting full life-cycle process management].

    PubMed

    Su, Peng; Zhong, Jianping

    2014-03-01

    Based on the analysis of the present status of medical devices management, this paper optimized management process, developed a medical devices management system with Web technologies. With information technology to dynamic master the use of state of the entire life-cycle of medical devices. Through the closed-loop management with pre-event budget, mid-event control and after-event analysis, improved the delicacy management level of medical devices, optimized asset allocation, promoted positive operation of devices.

  1. Process material management in the Space Station environment

    NASA Technical Reports Server (NTRS)

    Perry, J. L.; Humphries, W. R.

    1988-01-01

    The Space Station will provide a unique facility for conducting material-processing and life-science experiments under microgravity conditions. These conditions place special requirements on the U.S. Laboratory for storing and transporting chemicals and process fluids, reclaiming water from selected experiments, treating and storing experiment wastes, and providing vacuum utilities. To meet these needs and provide a safe laboratory environment, the Process Material Management System (PMMS) is being developed. Preliminary design requirements and concepts related to the PMMS are addressed, and the MSFC PMMS breadboard test facility and a preliminary plan for validating the overall system design are discussed.

  2. Optimizing the discovery organization for innovation.

    PubMed

    Sams-Dodd, Frank

    2005-08-01

    Strategic management is the process of adapting organizational structure and management principles to fit the strategic goal of the business unit. The pharmaceutical industry has generally been expert at optimizing its organizations for drug development, but has rarely implemented different structures for the early discovery process, where the objective is innovation and the transformation of innovation into drug projects. Here, a set of strategic management methods is proposed, covering team composition, organizational structure, management principles and portfolio management, which are designed to increase the level of innovation in the early drug discovery process.

  3. Performance Management and Optimization of Semiconductor Design Projects

    NASA Astrophysics Data System (ADS)

    Hinrichs, Neele; Olbrich, Markus; Barke, Erich

    2010-06-01

    The semiconductor industry is characterized by fast technological changes and small time-to-market windows. Improving productivity is the key factor to stand up to the competitors and thus successfully persist in the market. In this paper a Performance Management System for analyzing, optimizing and evaluating chip design projects is presented. A task graph representation is used to optimize the design process regarding time, cost and workload of resources. Key Performance Indicators are defined in the main areas cost, profit, resources, process and technical output to appraise the project.

  4. MANTECH project book

    NASA Astrophysics Data System (ADS)

    The effective integration of processes, systems, and procedures used in the production of aerospace systems using computer technology is managed by the Integration Technology Division (MTI). Under its auspices are the Information Management Branch, which is actively involved with information management, information sciences and integration, and the Implementation Branch, whose technology areas include computer integrated manufacturing, engineering design, operations research, and material handling and assembly. The Integration Technology Division combines design, manufacturing, and supportability functions within the same organization. The Processing and Fabrication Division manages programs to improve structural and nonstructural materials processing and fabrication. Within this division, the Metals Branch directs the manufacturing methods program for metals and metal matrix composites processing and fabrication. The Nonmetals Branch directs the manufacturing methods programs, which include all manufacturing processes for producing and utilizing propellants, plastics, resins, fibers, composites, fluid elastomers, ceramics, glasses, and coatings. The objective of the Industrial Base Analysis Division is to act as focal point for the USAF industrial base program for productivity, responsiveness, and preparedness planning.

  5. Analysis of Design-Build Processes, Best Practices, and Applications to the Department of Defense

    DTIC Science & Technology

    2006-06-01

    NAVFAC design-build processes published in trade journals, books , magazines, internet articles, and DoD policy. In their book , Contract Management...literature review concentrates on recent articles published in books , trade magazines, and on the internet to determine design-build processes and...Keith Molenaar ) Design-build projects under the State of California’s Public Contract Code (Legaltips.org, 2006) requires the owner, for example the

  6. A systems-based approach for integrated design of materials, products and design process chains

    NASA Astrophysics Data System (ADS)

    Panchal, Jitesh H.; Choi, Hae-Jin; Allen, Janet K.; McDowell, David L.; Mistree, Farrokh

    2007-12-01

    The concurrent design of materials and products provides designers with flexibility to achieve design objectives that were not previously accessible. However, the improved flexibility comes at a cost of increased complexity of the design process chains and the materials simulation models used for executing the design chains. Efforts to reduce the complexity generally result in increased uncertainty. We contend that a systems based approach is essential for managing both the complexity and the uncertainty in design process chains and simulation models in concurrent material and product design. Our approach is based on simplifying the design process chains systematically such that the resulting uncertainty does not significantly affect the overall system performance. Similarly, instead of striving for accurate models for multiscale systems (that are inherently complex), we rely on making design decisions that are robust to uncertainties in the models. Accordingly, we pursue hierarchical modeling in the context of design of multiscale systems. In this paper our focus is on design process chains. We present a systems based approach, premised on the assumption that complex systems can be designed efficiently by managing the complexity of design process chains. The approach relies on (a) the use of reusable interaction patterns to model design process chains, and (b) consideration of design process decisions using value-of-information based metrics. The approach is illustrated using a Multifunctional Energetic Structural Material (MESM) design example. Energetic materials store considerable energy which can be released through shock-induced detonation; conventionally, they are not engineered for strength properties. The design objectives for the MESM in this paper include both sufficient strength and energy release characteristics. The design is carried out by using models at different length and time scales that simulate different aspects of the system. Finally, by applying the method to the MESM design problem, we show that the integrated design of materials and products can be carried out more efficiently by explicitly accounting for design process decisions with the hierarchy of models.

  7. 75 FR 13275 - Environmental Impact Statements and Regulations; Availability of EPA Comments

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-19

    ... Designation, Motorized Travel Management, (Formerly Motorized Route Designation), Implementation, Siskiyou... travel management planning process and season of use and wet weather closures, and recommended the action... Yosemite Institute Environment Education Campus, Implementation, Mariposa County, CA. Summary: No formal...

  8. Managing IT service management implementation complexity: from the perspective of the Warfield Version of systems science

    NASA Astrophysics Data System (ADS)

    Wan, Jiangping; Jones, James D.

    2013-11-01

    The Warfield version of systems science supports a wide variety of application areas, and is useful to practitioners who use the work program of complexity (WPOC) tool. In this article, WPOC is applied to information technology service management (ITSM) for managing the complexity of projects. In discussing the application of WPOC to ITSM, we discuss several steps of WPOC. The discovery step of WPOC consists of a description process and a diagnosis process. During the description process, 52 risk factors are identified, which are then narrowed to 20 key risk factors. All of this is done by interviews and surveys. Root risk factors (the most basic risk factors) consist of 11 kinds of common 'mindbugs' which are selected from an interpretive structural model. This is achieved by empirical analysis of 25 kinds of mindbugs. (A lesser aim of this research is to affirm that these mindbugs developed from a Western mindset have corresponding relevance in a completely different culture: the Peoples Republic of China.) During the diagnosis process, the relationships among the root risk factors in the implementation of the ITSM project are identified. The resolution step of WPOC consists of a design process and an implementation process. During the design process, issues related to the ITSM application are compared to both e-Government operation and maintenance, and software process improvement. The ITSM knowledge support structure is also designed at this time. During the implementation process, 10 keys to the successful implementation of ITSM projects are identified.

  9. Uncertainty management in intelligent design aiding systems

    NASA Technical Reports Server (NTRS)

    Brown, Donald E.; Gabbert, Paula S.

    1988-01-01

    A novel approach to uncertainty management which is particularly effective in intelligent design aiding systems for large-scale systems is presented. The use of this approach in the materials handling system design domain is discussed. It is noted that, during any point in the design process, a point value can be obtained for the evaluation of feasible designs; however, the techniques described provide unique solutions for these point values using only the current information about the design environment.

  10. Designing a complex intervention for dementia case management in primary care

    PubMed Central

    2013-01-01

    Background Community-based support will become increasingly important for people with dementia, but currently services are fragmented and the quality of care is variable. Case management is a popular approach to care co-ordination, but evidence to date on its effectiveness in dementia has been equivocal. Case management interventions need to be designed to overcome obstacles to care co-ordination and maximise benefit. A successful case management methodology was adapted from the United States (US) version for use in English primary care, with a view to a definitive trial. Medical Research Council guidance on the development of complex interventions was implemented in the adaptation process, to capture the skill sets, person characteristics and learning needs of primary care based case managers. Methods Co-design of the case manager role in a single NHS provider organisation, with external peer review by professionals and carers, in an iterative technology development process. Results The generic skills and personal attributes were described for practice nurses taking up the case manager role in their workplaces, and for social workers seconded to general practice teams, together with a method of assessing their learning needs. A manual of information material for people with dementia and their family carers was also created using the US intervention as its source. Conclusions Co-design produces rich products that have face validity and map onto the complexities of dementia and of health and care services. The feasibility of the case manager role, as described and defined by this process, needs evaluation in ‘real life’ settings. PMID:23865537

  11. Development of the Design Laboratory.

    ERIC Educational Resources Information Center

    Silla, Harry

    1986-01-01

    Describes the design laboratory at the Stevens Institute of Technology (SIT). Considers course objectives, design projects, project structure, mechanical design, project management, and laboratory operation. This laboratory complements SIT's course in process design, giving students a complete design experience. (JN)

  12. National meeting to review IPAD status and goals. [Integrated Programs for Aerospace-vehicle Design

    NASA Technical Reports Server (NTRS)

    Fulton, R. E.

    1980-01-01

    A joint NASA/industry project called Integrated Programs for Aerospace-vehicle Design (IPAD) is described, which has the goal of raising aerospace-industry productivity through the application of computers to integrate company-wide management of engineering data. Basically a general-purpose interactive computing system developed to support engineering design processes, the IPAD design is composed of three major software components: the executive, data management, and geometry and graphics software. Results of IPAD activities include a comprehensive description of a future representative aerospace vehicle design process and its interface to manufacturing, and requirements and preliminary design of a future IPAD software system to integrate engineering activities of an aerospace company having several products under simultaneous development.

  13. Process-driven information management system at a biotech company: concept and implementation.

    PubMed

    Gobbi, Alberto; Funeriu, Sandra; Ioannou, John; Wang, Jinyi; Lee, Man-Ling; Palmer, Chris; Bamford, Bob; Hewitt, Robin

    2004-01-01

    While established pharmaceutical companies have chemical information systems in place to manage their compounds and the associated data, new startup companies need to implement these systems from scratch. Decisions made early in the design phase usually have long lasting effects on the expandability, maintenance effort, and costs associated with the information management system. Careful analysis of work and data flows, both inter- and intradepartmental, and identification of existing dependencies between activities are important. This knowledge is required to implement an information management system, which enables the research community to work efficiently by avoiding redundant registration and processing of data and by timely provision of the data whenever needed. This paper first presents the workflows existing at Anadys, then ARISE, the research information management system developed in-house at Anadys. ARISE was designed to support the preclinical drug discovery process and covers compound registration, analytical quality control, inventory management, high-throughput screening, lower throughput screening, and data reporting.

  14. Design Thinking for mHealth Application Co-Design to Support Heart Failure Self-Management.

    PubMed

    Woods, Leanna; Cummings, Elizabeth; Duff, Jed; Walker, Kim

    2017-01-01

    Heart failure is a prevalent, progressive chronic disease costing in excess of $1billion per year in Australia alone. Disease self-management has positive implications for the patient and decreases healthcare usage. However, adherence to recommended guidelines is challenging and existing literature reports sub-optimal adherence. mHealth applications in chronic disease education have the potential to facilitate patient enablement for disease self-management. To the best of our knowledge no heart failure self-management application is available for safe use by our patients. In this paper, we present the process established to co-design a mHealth application in support of heart-failure self-management. For this development, an interdisciplinary team systematically proceeds through the phases of Stanford University's Design Thinking process; empathise, define, ideate, prototype and test with a user-centred philosophy. Using this clinician-led heart failure app research as a case study, we describe a sequence of procedures to engage with local patients, carers, software developers, eHealth experts and clinical colleagues to foster rigorously developed and locally relevant patient-facing mHealth solutions. Importantly, patients are engaged in each stage with ethnographic interviews, a series of workshops and multiple re-design iterations.

  15. RMP Guidance for Warehouses - Chapter 5: Management System

    EPA Pesticide Factsheets

    Your management system should oversee the implementation of the risk management program elements, and designate and assign responsibility in order to make process safety a constant priority. Includes sample documentation.

  16. Water quality management library. 2. edition

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Eckenfelder, W.W.; Malina, J.F.; Patterson, J.W.

    1998-12-31

    A series of ten books offered in conjunction with Water Quality International, the Biennial Conference and Exposition of the International Association on Water Pollution Research and Control (IAWPRC). Volume 1, Activated Sludge Process, Design and Control, 2nd edition, 1998: Volume 2, Upgrading Wastewater Treatment Plants, 2nd edition, 1998: Volume 3, Toxicity Reduction, 2nd edition, 1998: Volume 4, Municipal Sewage Sludge Management, 2nd edition, 1998: Volume 5, Design and Retrofit of Wastewater Treatment Plants for Biological Nutrient Removal, 1st edition, 1992: Volume 6, Dynamics and Control of the Activated Sludge Process, 2nd edition, 1998: Volume 7: Design of Anaerobic Processes formore » the Treatment of Industrial and Municipal Wastes, 1st edition, 1992: Volume 8, Groundwater Remediation, 1st edition, 1992: Volume 9, Nonpoint Pollution and Urban Stormwater Management, 1st edition, 1995: Volume 10, Wastewater Reclamation and Reuse, 1st edition, 1998.« less

  17. NHDOT : process for municipally managed state aid highway program projects

    DOT National Transportation Integrated Search

    2006-05-23

    The design and construction of Municipally Managed State Aid Highway Program projects must comply with the requirements in this guideline in order to receive State Aid under the applicable provisions of RSA 235. Under this process, State Aid Construc...

  18. 40 CFR 63.138 - Process wastewater provisions-performance standards for treatment processes managing Group 1...

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... applicable. (4) Performance tests and design evaluations. If design steam stripper option (§ 63.138(d)) or..., neither a design evaluation nor a performance test is required. For any other non-biological treatment... or operator shall conduct either a design evaluation as specified in § 63.138(j), or a performance...

  19. Knowledge management in the engineering design environment

    NASA Technical Reports Server (NTRS)

    Briggs, Hugh C.

    2006-01-01

    The Aerospace and Defense industry is experiencing an increasing loss of knowledge through workforce reductions associated with business consolidation and retirement of senior personnel. Significant effort is being placed on process definition as part of ISO certification and, more recently, CMMI certification. The process knowledge in these efforts represents the simplest of engineering knowledge and many organizations are trying to get senior engineers to write more significant guidelines, best practices and design manuals. A new generation of design software, known as Product Lifecycle Management systems, has many mechanisms for capturing and deploying a wider variety of engineering knowledge than simple process definitions. These hold the promise of significant improvements through reuse of prior designs, codification of practices in workflows, and placement of detailed how-tos at the point of application.

  20. Management of the Cs/Sr Capsule Project at the Hanford Site. Technology Readiness Assessment Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None, None

    The Federal Project Director (FPD) for the U.S. Department of Energy (DOE), Richland Operations Office (RL) Waste Management and D&D Division (WMD) requested a Technology Readiness Assessment (TRA) for the Management of the Cesium/Strontium Capsule Storage Project (MCSCP) at the Waste Encapsulation and Storage Facility (WESF) on the Hanford Site in Washington State. The MCSCP CD-1 TRA was performed by a team selected in collaboration between the Office of Environmental Management (EM) Chief Engineer (EM-3.3) and RL, WMD FPD. The TRA Team included subject matter and technical experts having experience in cask storage, process engineering, and system design who weremore » independent of the MCSCP, and the team was led by the Director of Operations and Processes from the EM Chief Engineer's Office (EM-3.32). Movement of the Cs/Sr capsules to dry storage, based on information from the conceptual design, involves (1) capsule packaging, (2) capsule transfer, and (3) capsule storage. The project has developed a conceptual process, described in 30059-R-02, "NAC Conceptual Design Report for the Management of the Cesium and Strontium Capsules Project", which identifies the five major activities in the process to complete the transfer from storage pool to pad-mounted cask storage. The process, shown schematically in Figure 1, is comprised of the following process steps: (1) loading capsules into the UCS; (2) UCS processing; (3) UCS insertion into the TSC Basket; (4) cask transport from WESF to CSA and (5) extended storage at the CSA.« less

  1. A practical approach for comparing management strategies in complex forest ecosystems using meta-modelling toolkits

    Treesearch

    Andrew Fall; B. Sturtevant; M.-J. Fortin; M. Papaik; F. Doyon; D. Morgan; K. Berninger; C. Messier

    2010-01-01

    The complexity and multi-scaled nature of forests poses significant challenges to understanding and management. Models can provide useful insights into process and their interactions, and implications of alternative management options. Most models, particularly scientific models, focus on a relatively small set of processes and are designed to operate within a...

  2. A Process Management System for Networked Manufacturing

    NASA Astrophysics Data System (ADS)

    Liu, Tingting; Wang, Huifen; Liu, Linyan

    With the development of computer, communication and network, networked manufacturing has become one of the main manufacturing paradigms in the 21st century. Under the networked manufacturing environment, there exist a large number of cooperative tasks susceptible to alterations, conflicts caused by resources and problems of cost and quality. This increases the complexity of administration. Process management is a technology used to design, enact, control, and analyze networked manufacturing processes. It supports efficient execution, effective management, conflict resolution, cost containment and quality control. In this paper we propose an integrated process management system for networked manufacturing. Requirements of process management are analyzed and architecture of the system is presented. And a process model considering process cost and quality is developed. Finally a case study is provided to explain how the system runs efficiently.

  3. Rehabilitation centers in change: participatory methods for managing redesign and renovation.

    PubMed

    Lahtinen, Marjaana; Nenonen, Suvi; Rasila, Heidi; Lehtelä, Jouni; Ruohomäki, Virpi; Reijula, Kari

    2014-01-01

    The aim of this article is to describe a set of participatory methods that we have either developed or modified for developing future work and service environments to better suit renewable rehabilitation processes. We discuss the methods in a larger framework of change process model and participatory design. Rehabilitation organizations are currently in transition; customer groups, financing, services, and the processes of rehabilitation centers are changing. The pressure for change challenges the centers to develop both their processes and facilities. There is a need for methods that support change management. Four participatory methods were developed: future workshop, change survey, multi-method assessment tool, and participatory design generator cards. They were tested and evaluated in three rehabilitation centers at the different phases of their change process. The developed methods were considered useful in creating a mutual understanding of the change goals between different stakeholders, providing a good picture of the work community's attitudes toward the change, forming an integrated overview of the built and perceived environment, inspiring new solutions, and supporting the management in steering the change process. The change process model described in this article serves as a practical framework that combined the viewpoints of organizational and facility development. However, participatory design continues to face challenges concerning communication between different stakeholders, and further development of the methods and processes is still needed. Intervention studies could provide data on the success factors that enhance the transformations in the rehabilitation sector. Design process, methodology, organizational transformation, planning, renovation.

  4. Enhancing the Teaching-Learning Process: A Knowledge Management Approach

    ERIC Educational Resources Information Center

    Bhusry, Mamta; Ranjan, Jayanthi

    2012-01-01

    Purpose: The purpose of this paper is to emphasize the need for knowledge management (KM) in the teaching-learning process in technical educational institutions (TEIs) in India, and to assert the impact of information technology (IT) based KM intervention in the teaching-learning process. Design/methodology/approach: The approach of the paper is…

  5. Ordering Design Tasks Based on Coupling Strengths

    NASA Technical Reports Server (NTRS)

    Rogers, J. L.; Bloebaum, C. L.

    1994-01-01

    The design process associated with large engineering systems requires an initial decomposition of the complex system into modules of design tasks which are coupled through the transference of output data. In analyzing or optimizing such a coupled system, it is essential to be able to determine which interactions figure prominently enough to significantly affect the accuracy of the system solution. Many decomposition approaches assume the capability is available to determine what design tasks and interactions exist and what order of execution will be imposed during the analysis process. Unfortunately, this is often a complex problem and beyond the capabilities of a human design manager. A new feature for DeMAID (Design Manager's Aid for Intelligent Decomposition) will allow the design manager to use coupling strength information to find a proper sequence for ordering the design tasks. In addition, these coupling strengths aid in deciding if certain tasks or couplings could be removed (or temporarily suspended) from consideration to achieve computational savings without a significant loss of system accuracy. New rules are presented and two small test cases are used to show the effects of using coupling strengths in this manner.

  6. Ordering design tasks based on coupling strengths

    NASA Technical Reports Server (NTRS)

    Rogers, James L., Jr.; Bloebaum, Christina L.

    1994-01-01

    The design process associated with large engineering systems requires an initial decomposition of the complex system into modules of design tasks which are coupled through the transference of output data. In analyzing or optimizing such a coupled system, it is essential to be able to determine which interactions figure prominently enough to significantly affect the accuracy of the system solution. Many decomposition approaches assume the capability is available to determine what design tasks and interactions exist and what order of execution will be imposed during the analysis process. Unfortunately, this is often a complex problem and beyond the capabilities of a human design manager. A new feature for DeMAID (Design Manager's Aid for Intelligent Decomposition) will allow the design manager to use coupling strength information to find a proper sequence for ordering the design tasks. In addition, these coupling strengths aid in deciding if certain tasks or couplings could be removed (or temporarily suspended) from consideration to achieve computational savings without a significant loss of system accuracy. New rules are presented and two small test cases are used to show the effects of using coupling strengths in this manner.

  7. The Design of a High Performance Earth Imagery and Raster Data Management and Processing Platform

    NASA Astrophysics Data System (ADS)

    Xie, Qingyun

    2016-06-01

    This paper summarizes the general requirements and specific characteristics of both geospatial raster database management system and raster data processing platform from a domain-specific perspective as well as from a computing point of view. It also discusses the need of tight integration between the database system and the processing system. These requirements resulted in Oracle Spatial GeoRaster, a global scale and high performance earth imagery and raster data management and processing platform. The rationale, design, implementation, and benefits of Oracle Spatial GeoRaster are described. Basically, as a database management system, GeoRaster defines an integrated raster data model, supports image compression, data manipulation, general and spatial indices, content and context based queries and updates, versioning, concurrency, security, replication, standby, backup and recovery, multitenancy, and ETL. It provides high scalability using computer and storage clustering. As a raster data processing platform, GeoRaster provides basic operations, image processing, raster analytics, and data distribution featuring high performance computing (HPC). Specifically, HPC features include locality computing, concurrent processing, parallel processing, and in-memory computing. In addition, the APIs and the plug-in architecture are discussed.

  8. Climate-Smart Design for Ecosystem Management: A Test Application for Coral Reefs.

    PubMed

    West, Jordan M; Courtney, Catherine A; Hamilton, Anna T; Parker, Britt A; Julius, Susan H; Hoffman, Jennie; Koltes, Karen H; MacGowan, Petra

    2017-01-01

    The interactive and cumulative impacts of climate change on natural resources such as coral reefs present numerous challenges for conservation planning and management. Climate change adaptation is complex due to climate-stressor interactions across multiple spatial and temporal scales. This leaves decision makers worldwide faced with local, regional, and global-scale threats to ecosystem processes and services, occurring over time frames that require both near-term and long-term planning. Thus there is a need for structured approaches to adaptation planning that integrate existing methods for vulnerability assessment with design and evaluation of effective adaptation responses. The Corals and Climate Adaptation Planning project of the U.S. Coral Reef Task Force seeks to develop guidance for improving coral reef management through tailored application of a climate-smart approach. This approach is based on principles from a recently-published guide which provides a framework for adopting forward-looking goals, based on assessing vulnerabilities to climate change and applying a structured process to design effective adaptation strategies. Work presented in this paper includes: (1) examination of the climate-smart management cycle as it relates to coral reefs; (2) a compilation of adaptation strategies for coral reefs drawn from a comprehensive review of the literature; (3) in-depth demonstration of climate-smart design for place-based crafting of robust adaptation actions; and (4) feedback from stakeholders on the perceived usefulness of the approach. We conclude with a discussion of lessons-learned on integrating climate-smart design into real-world management planning processes and a call from stakeholders for an "adaptation design tool" that is now under development.

  9. Generic Health Management: A System Engineering Process Handbook Overview and Process

    NASA Technical Reports Server (NTRS)

    Wilson, Moses Lee; Spruill, Jim; Hong, Yin Paw

    1995-01-01

    Health Management, a System Engineering Process, is one of those processes-techniques-and-technologies used to define, design, analyze, build, verify, and operate a system from the viewpoint of preventing, or minimizing, the effects of failure or degradation. It supports all ground and flight elements during manufacturing, refurbishment, integration, and operation through combined use of hardware, software, and personnel. This document will integrate Health Management Processes (six phases) into five phases in such a manner that it is never a stand alone task/effort which separately defines independent work functions.

  10. Manufacturing Squares: An Integrative Statistical Process Control Exercise

    ERIC Educational Resources Information Center

    Coy, Steven P.

    2016-01-01

    In the exercise, students in a junior-level operations management class are asked to manufacture a simple product. Given product specifications, they must design a production process, create roles and design jobs for each team member, and develop a statistical process control plan that efficiently and effectively controls quality during…

  11. Nurses and nurse assistants' experiences with using a design thinking approach to innovation in a nursing home.

    PubMed

    Eines, Trude Fløystad; Vatne, Solfrid

    2018-05-01

    The aim of this study was to evaluate nurses' and nurse assistants' experiences with a design thinking approach to innovation used in a nursing home in Norway. A design thinking approach to innovation that focuses on users' needs can be employed to address many of the challenges facing health care providers in a field facing a growing ageing population, complex diseases and financial shortfalls. This study is based on a thematic analysis of four focus group interviews with nurses and nurse assistants (n = 23). In the initial phase of developing the new service model, which included defining staff roles and responsibilities, participating nurses and nurse assistants felt engaged and motivated by the designers' inclusive and creative methods. However, during the new model's testing phase, they were critical of management's lack of involvement in the model`s implementation and therefore became less motivated about the project. The findings of the study highlight the importance of the designers cooperating with management and staff for the duration of the innovation process. Challenging innovation processes require strong managers who engage with designers, patients, staff and volunteers throughout all phases of an innovation process using a design thinking approach. © 2017 John Wiley & Sons Ltd.

  12. Design and Management Criteria for Fish, Amphibian, and Reptile Communities Within Created Agricultural Wetlands

    USDA-ARS?s Scientific Manuscript database

    Design and management criteria for created agricultural wetlands in the midwestern United States typically focus on maximizing the ability to process agricultural runoff. Ecological benefits for fish, amphibian, and reptiles are often secondary considerations. One example of this water quality focu...

  13. Transforming revenue management.

    PubMed

    Silveria, Richard; Alliegro, Debra; Nudd, Steven

    2008-11-01

    Healthcare organizations that want to undertake a patient administrative/revenue management transformation should: Define the vision with underlying business objectives and key performance measures. Strategically partner with key vendors for business process development and technology design. Create a program organization and governance infrastructure. Develop a corporate design model that defines the standards for operationalizing the vision. Execute the vision through technology deployment and corporate design model implementation.

  14. New knowledge network evaluation method for design rationale management

    NASA Astrophysics Data System (ADS)

    Jing, Shikai; Zhan, Hongfei; Liu, Jihong; Wang, Kuan; Jiang, Hao; Zhou, Jingtao

    2015-01-01

    Current design rationale (DR) systems have not demonstrated the value of the approach in practice since little attention is put to the evaluation method of DR knowledge. To systematize knowledge management process for future computer-aided DR applications, a prerequisite is to provide the measure for the DR knowledge. In this paper, a new knowledge network evaluation method for DR management is presented. The method characterizes the DR knowledge value from four perspectives, namely, the design rationale structure scale, association knowledge and reasoning ability, degree of design justification support and degree of knowledge representation conciseness. The DR knowledge comprehensive value is also measured by the proposed method. To validate the proposed method, different style of DR knowledge network and the performance of the proposed measure are discussed. The evaluation method has been applied in two realistic design cases and compared with the structural measures. The research proposes the DR knowledge evaluation method which can provide object metric and selection basis for the DR knowledge reuse during the product design process. In addition, the method is proved to be more effective guidance and support for the application and management of DR knowledge.

  15. Computer-aided software development process design

    NASA Technical Reports Server (NTRS)

    Lin, Chi Y.; Levary, Reuven R.

    1989-01-01

    The authors describe an intelligent tool designed to aid managers of software development projects in planning, managing, and controlling the development process of medium- to large-scale software projects. Its purpose is to reduce uncertainties in the budget, personnel, and schedule planning of software development projects. It is based on dynamic model for the software development and maintenance life-cycle process. This dynamic process is composed of a number of time-varying, interacting developmental phases, each characterized by its intended functions and requirements. System dynamics is used as a modeling methodology. The resulting Software LIfe-Cycle Simulator (SLICS) and the hybrid expert simulation system of which it is a subsystem are described.

  16. A Map for Clinical Laboratories Management Indicators in the Intelligent Dashboard.

    PubMed

    Azadmanjir, Zahra; Torabi, Mashallah; Safdari, Reza; Bayat, Maryam; Golmahi, Fatemeh

    2015-08-01

    management challenges of clinical laboratories are more complicated for educational hospital clinical laboratories. Managers can use tools of business intelligence (BI), such as information dashboards that provide the possibility of intelligent decision-making and problem solving about increasing income, reducing spending, utilization management and even improving quality. Critical phase of dashboard design is setting indicators and modeling causal relations between them. The paper describes the process of creating a map for laboratory dashboard. the study is one part of an action research that begins from 2012 by innovation initiative for implementing laboratory intelligent dashboard. Laboratories management problems were determined in educational hospitals by the brainstorming sessions. Then, with regard to the problems key performance indicators (KPIs) specified. the map of indicators designed in form of three layered. They have a causal relationship so that issues measured in the subsequent layers affect issues measured in the prime layers. the proposed indicator map can be the base of performance monitoring. However, these indicators can be modified to improve during iterations of dashboard designing process.

  17. Innovation Process Design: A Change Management and Innovation Dimension Perspective

    NASA Astrophysics Data System (ADS)

    Peisl, Thomas; Reger, Veronika; Schmied, Juergen

    The authors propose an innovative approach to the management of innovation integrating business, process, and maturity dimensions. Core element of the concept is the adaptation of ISO/IEC 15504 to the innovation process including 14 innovation drivers. Two managerial models are applied to conceptualize and visualize the respective innovation strategies, the Balanced Scorecard and a Barriers in Change Processes Model. An illustrative case study shows a practical implementation process.

  18. A design for a new catalog manager and associated file management for the Land Analysis System (LAS)

    NASA Technical Reports Server (NTRS)

    Greenhagen, Cheryl

    1986-01-01

    Due to the larger number of different types of files used in an image processing system, a mechanism for file management beyond the bounds of typical operating systems is necessary. The Transportable Applications Executive (TAE) Catalog Manager was written to meet this need. Land Analysis System (LAS) users at the EROS Data Center (EDC) encountered some problems in using the TAE catalog manager, including catalog corruption, networking difficulties, and lack of a reliable tape storage and retrieval capability. These problems, coupled with the complexity of the TAE catalog manager, led to the decision to design a new file management system for LAS, tailored to the needs of the EDC user community. This design effort, which addressed catalog management, label services, associated data management, and enhancements to LAS applications, is described. The new file management design will provide many benefits including improved system integration, increased flexibility, enhanced reliability, enhanced portability, improved performance, and improved maintainability.

  19. Design of Student Information Management Database Application System for Office and Departmental Target Responsibility System

    NASA Astrophysics Data System (ADS)

    Zhou, Hui

    It is the inevitable outcome of higher education reform to carry out office and departmental target responsibility system, in which statistical processing of student's information is an important part of student's performance review. On the basis of the analysis of the student's evaluation, the student information management database application system is designed by using relational database management system software in this paper. In order to implement the function of student information management, the functional requirement, overall structure, data sheets and fields, data sheet Association and software codes are designed in details.

  20. Distributed Group Design Process: Lessons Learned.

    ERIC Educational Resources Information Center

    Eseryel, Deniz; Ganesan, Radha

    A typical Web-based training development team consists of a project manager, an instructional designer, a subject-matter expert, a graphic artist, and a Web programmer. The typical scenario involves team members working together in the same setting during the entire design and development process. What happens when the team is distributed, that is…

  1. Integrated Work Management: Overview, Course 31881

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Simpson, Lewis Edward

    Integrated work management (IWM) is the process used for formally implementing the five-step process associated with integrated safety management (ISM) and integrated safeguards and security management (ISSM) at Los Alamos National Laboratory (LANL). IWM also directly supports the LANL Environmental Management System (EMS). IWM helps all workers and managers perform work safely and securely and in a manner that protects people, the environment, property, and the security of the nation. The IWM process applies to all work activities at LANL, from working in the office to designing experiments to assembling and detonating explosives. The primary LANL document that establishes andmore » describes IWM requirements is Procedure (P) 300, Integrated Work Management.« less

  2. Exploitation and Benefits of BIM in Construction Project Management

    NASA Astrophysics Data System (ADS)

    Mesároš, Peter; Mandičák, Tomáš

    2017-10-01

    BIM is increasingly getting into the awareness in construction industry. BIM is the process of creating and data managing of the building during its life cycle. BIM became a part of management tools in modern construction companies. Construction projects have a number of participants. It means difficulty process of construction project management and a serious requirement for processing the huge amount of information including design, construction, time and cost parameters, economic efficiency and sustainability. Progressive information and communication technologies support cost management and management of construction project. One of them is Building Information Modelling. Aim of the paper is to examine the impact of BIM exploitation and benefits on construction project management in Slovak companies.

  3. TMT approach to observatory software development process

    NASA Astrophysics Data System (ADS)

    Buur, Hanne; Subramaniam, Annapurni; Gillies, Kim; Dumas, Christophe; Bhatia, Ravinder

    2016-07-01

    The purpose of the Observatory Software System (OSW) is to integrate all software and hardware components of the Thirty Meter Telescope (TMT) to enable observations and data capture; thus it is a complex software system that is defined by four principal software subsystems: Common Software (CSW), Executive Software (ESW), Data Management System (DMS) and Science Operations Support System (SOSS), all of which have interdependencies with the observatory control systems and data acquisition systems. Therefore, the software development process and plan must consider dependencies to other subsystems, manage architecture, interfaces and design, manage software scope and complexity, and standardize and optimize use of resources and tools. Additionally, the TMT Observatory Software will largely be developed in India through TMT's workshare relationship with the India TMT Coordination Centre (ITCC) and use of Indian software industry vendors, which adds complexity and challenges to the software development process, communication and coordination of activities and priorities as well as measuring performance and managing quality and risk. The software project management challenge for the TMT OSW is thus a multi-faceted technical, managerial, communications and interpersonal relations challenge. The approach TMT is using to manage this multifaceted challenge is a combination of establishing an effective geographically distributed software team (Integrated Product Team) with strong project management and technical leadership provided by the TMT Project Office (PO) and the ITCC partner to manage plans, process, performance, risk and quality, and to facilitate effective communications; establishing an effective cross-functional software management team composed of stakeholders, OSW leadership and ITCC leadership to manage dependencies and software release plans, technical complexities and change to approved interfaces, architecture, design and tool set, and to facilitate effective communications; adopting an agile-based software development process across the observatory to enable frequent software releases to help mitigate subsystem interdependencies; defining concise scope and work packages for each of the OSW subsystems to facilitate effective outsourcing of software deliverables to the ITCC partner, and to enable performance monitoring and risk management. At this stage, the architecture and high-level design of the software system has been established and reviewed. During construction each subsystem will have a final design phase with reviews, followed by implementation and testing. The results of the TMT approach to the Observatory Software development process will only be preliminary at the time of the submittal of this paper, but it is anticipated that the early results will be a favorable indication of progress.

  4. 45 CFR 205.37 - Responsibilities of the Administration for Children and Families (ACF).

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... Processing and Information Retrieval System Guide. The initial advance automatic data processing planning... description of the proposed statewide management system, including the description of information flows, input..., review, assess, and inspect the planning, design, and operation of, statewide management information...

  5. 45 CFR 205.37 - Responsibilities of the Administration for Children and Families (ACF).

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... Application Processing and Information Retrieval System Guide. The initial advance automatic data processing... description of the proposed statewide management system, including the description of information flows, input..., review, assess, and inspect the planning, design, and operation of, statewide management information...

  6. 45 CFR 205.37 - Responsibilities of the Administration for Children and Families (ACF).

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Application Processing and Information Retrieval System Guide. The initial advance automatic data processing... description of the proposed statewide management system, including the description of information flows, input..., review, assess, and inspect the planning, design, and operation of, statewide management information...

  7. 45 CFR 205.36 - State plan requirements.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ..., of an automated statewide management information system designed effectively and efficiently, to assist management in the administration of an approved AFDC State plan. The submission process to amend... account for— (1) All the factors in the total eligibility determination process under the plan for aid...

  8. Global Grid Telemedicine System: Expert Consult Manager

    DTIC Science & Technology

    2000-10-01

    Department of the Army position, policy or decision unless so designated by other documentation. DTIC QUALITY iw^^rxi 20010122 014 REPORT DOCUMENTATION...processes and personnel for collecting, processing, storing, disseminating and managing information on demand to warfighters, policy makers, and...to be responsive to and incorporate current and future policy decisions. (7) Be continuously aware, along with Network and Bandwidth managers, of

  9. GREENING OF OXIDATION CATALYSIS THROUGH IMPROVED CATALYST AND PROCESS DESIGN

    EPA Science Inventory


    Greening of Oxidation Catalysis Through Improved Catalysts and Process Design
    Michael A. Gonzalez*, Thomas Becker, and Raymond Smith

    United State Environmental Protection Agency, Office of Research and Development, National Risk Management Research Laboratory, 26 W...

  10. Implementation of quality by design toward processing of food products.

    PubMed

    Rathore, Anurag S; Kapoor, Gautam

    2017-05-28

    Quality by design (QbD) is a systematic approach that begins with predefined objectives and emphasizes product and process understanding and process control. It is an approach based on principles of sound science and quality risk management. As the food processing industry continues to embrace the idea of in-line, online, and/or at-line sensors and real-time characterization for process monitoring and control, the existing gaps with regard to our ability to monitor multiple parameters/variables associated with the manufacturing process will be alleviated over time. Investments made for development of tools and approaches that facilitate high-throughput analytical and process development, process analytical technology, design of experiments, risk analysis, knowledge management, and enhancement of process/product understanding would pave way for operational and economic benefits later in the commercialization process and across other product pipelines. This article aims to achieve two major objectives. First, to review the progress that has been made in the recent years on the topic of QbD implementation in processing of food products and second, present a case study that illustrates benefits of such QbD implementation.

  11. Solid Waste Management Planning--A Methodology

    ERIC Educational Resources Information Center

    Theisen, Hilary M.; And Others

    1975-01-01

    This article presents a twofold solid waste management plan consisting of a basic design methodology and a decision-making methodology. The former provides a framework for the developing plan while the latter builds flexibility into the design so that there is a model for use during the planning process. (MA)

  12. A Communication Skills Training Course for Trans World Airlines Flight Service Managers.

    ERIC Educational Resources Information Center

    Hurst, Katherine

    A project analyzed, designed, developed, implemented, and evaluated a training program that would enable Trans World Airlines flight service managers to develop effective communication skills. The instructional systems design process was used throughout. The analysis identified the need for communication training for the target population. Program…

  13. Integrating fire management analysis into land management planning

    Treesearch

    Thomas J. Mills

    1983-01-01

    The analysis of alternative fire management programs should be integrated into the land and resource management planning process, but a single fire management analysis model cannot meet all planning needs. Therefore, a set of simulation models that are analytically separate from integrated land management planning models are required. The design of four levels of fire...

  14. The role of ecological monitoring in managing wilderness

    Treesearch

    Peter B. Landres

    1995-01-01

    Good management requires good information. Monitoring provides this information when it is structured into the process of management, well designed and executed. As federal and state agencies strive to implement a management paradigm based on sustaining ecosystems, ecological information becomes a vital part of managing natural resources. Inventory and monitoring...

  15. Management Information System Based on the Balanced Scorecard

    ERIC Educational Resources Information Center

    Kettunen, Juha; Kantola, Ismo

    2005-01-01

    Purpose: This study seeks to describe the planning and implementation in Finland of a campus-wide management information system using a rigorous planning methodology. Design/methodology/approach: The structure of the management information system is planned on the basis of the management process, where strategic management and the balanced…

  16. Feasibility study of an Integrated Program for Aerospace vehicle Design (IPAD). Volume 1A: Summary

    NASA Technical Reports Server (NTRS)

    Miller, R. E., Jr.; Redhed, D. D.; Kawaguchi, A. S.; Hansen, S. D.; Southall, J. W.

    1973-01-01

    IPAD was defined as a total system oriented to the product design process. This total system was designed to recognize the product design process, individuals and their design process tasks, and the computer-based IPAD System to aid product design. Principal elements of the IPAD System include the host computer and its interactive system software, new executive and data management software, and an open-ended IPAD library of technical programs to match the intended product design process. The basic goal of the IPAD total system is to increase the productivity of the product design organization. Increases in individual productivity were feasible through automation and computer support of routine information handling. Such proven automation can directly decrease cost and flowtime in the product design process.

  17. A strategic approach for managing conflict in hospitals: responding to the Joint Commission leadership standard, Part 2.

    PubMed

    Scott, Charity; Gerardi, Debra

    2011-02-01

    A well-designed conflict management process for hospital leaders should both retain the positive benefits of constructive conflict engagement and minimize the adverse consequences that unmanaged conflict can have on patient care. Dispute system design (DSD) experts recommend processes that emphasize the identification of the disputing parties' interests and that avoid reliance on exertions of power or resort to rights. In an emerging trend in designing conflict management systems, focus is placed on the relational dynamics among those involved in the conflict, in recognition of the reciprocal impact that each participant in a conflict has on the other. The aim is then to restore trust and heal damaged relationships as a component of resolution. The intent of Standard LD.02.04.01 is to prevent escalation to formal legal disputes and encourage leaders to overcome their conflict-avoidance tendencies through the use of well-designed approaches that support engagement with conflict. The sequence of collaborative options consists of individual coaching and counseling; informal face-to-face meetings; informal, internally facilitated meetings; informal, externally facilitated meetings; formal mediation; and postdispute analysis and feedback. Every hospital has unique needs, and every conflict management process must be tailored to individual circumstances. The recommendations in this two-part article can be adapted and incorporated in other, more comprehensive conflict management processes throughout the hospital. Expanding the conflict competence of leaders to enable them to effectively engage in and model constructive conflict-handling behaviors will further support the strategic goal of providing safe and effective patient care.

  18. Repository-Based Software Engineering Program: Working Program Management Plan

    NASA Technical Reports Server (NTRS)

    1993-01-01

    Repository-Based Software Engineering Program (RBSE) is a National Aeronautics and Space Administration (NASA) sponsored program dedicated to introducing and supporting common, effective approaches to software engineering practices. The process of conceiving, designing, building, and maintaining software systems by using existing software assets that are stored in a specialized operational reuse library or repository, accessible to system designers, is the foundation of the program. In addition to operating a software repository, RBSE promotes (1) software engineering technology transfer, (2) academic and instructional support of reuse programs, (3) the use of common software engineering standards and practices, (4) software reuse technology research, and (5) interoperability between reuse libraries. This Program Management Plan (PMP) is intended to communicate program goals and objectives, describe major work areas, and define a management report and control process. This process will assist the Program Manager, University of Houston at Clear Lake (UHCL) in tracking work progress and describing major program activities to NASA management. The goal of this PMP is to make managing the RBSE program a relatively easy process that improves the work of all team members. The PMP describes work areas addressed and work efforts being accomplished by the program; however, it is not intended as a complete description of the program. Its focus is on providing management tools and management processes for monitoring, evaluating, and administering the program; and it includes schedules for charting milestones and deliveries of program products. The PMP was developed by soliciting and obtaining guidance from appropriate program participants, analyzing program management guidance, and reviewing related program management documents.

  19. The ATLAS Public Web Pages: Online Management of HEP External Communication Content

    NASA Astrophysics Data System (ADS)

    Goldfarb, S.; Marcelloni, C.; Eli Phoboo, A.; Shaw, K.

    2015-12-01

    The ATLAS Education and Outreach Group is in the process of migrating its public online content to a professionally designed set of web pages built on the Drupal [1] content management system. Development of the front-end design passed through several key stages, including audience surveys, stakeholder interviews, usage analytics, and a series of fast design iterations, called sprints. Implementation of the web site involves application of the html design using Drupal templates, refined development iterations, and the overall population of the site with content. We present the design and development processes and share the lessons learned along the way, including the results of the data-driven discovery studies. We also demonstrate the advantages of selecting a back-end supported by content management, with a focus on workflow. Finally, we discuss usage of the new public web pages to implement outreach strategy through implementation of clearly presented themes, consistent audience targeting and messaging, and the enforcement of a well-defined visual identity.

  20. Biological effect of low-head sea lamprey barriers: Designs for extensive surveys and the value of incorporating intensive process-oriented research

    USGS Publications Warehouse

    Hayes, D.B.; Baylis, J.R.; Carl, L.M.; Dodd, H.R.; Goldstein, J.D.; McLaughlin, R.L.; Noakes, D.L.G.; Porto, L.M.

    2003-01-01

    Four sampling designs for quantifying the effect of low-head sea lamprey (Petromyzon marinus) barriers on fish communities were evaluated, and the contribution of process-oriented research to the overall confidence of results obtained was discussed. The designs include: (1) sample barrier streams post-construction; (2) sample barrier and reference streams post-construction; (3) sample barrier streams pre- and post-construction; and (4) sample barrier and reference streams pre- and post-construction. In the statistical literature, the principal basis for comparison of sampling designs is generally the precision achieved by each design. In addition to precision, designs should be compared based on the interpretability of results and on the scale to which the results apply. Using data collected in a broad survey of streams with and without sea lamprey barriers, some of the tradeoffs that occur among precision, scale, and interpretability are illustrated. Although circumstances such as funding and availability of pre-construction data may limit which design can be implemented, a pre/post-construction design including barrier and reference streams provides the most meaningful information for use in barrier management decisions. Where it is not feasible to obtain pre-construction data, a design including reference streams is important to maintain the interpretability of results. Regardless of the design used, process-oriented research provides a framework for interpreting results obtained in broad surveys. As such, information from both extensive surveys and intensive process-oriented research provides the best basis for fishery management actions, and gives researchers and managers the most confidence in the conclusions reached regarding the effects of sea lamprey barriers.

  1. SISYPHUS: A high performance seismic inversion factory

    NASA Astrophysics Data System (ADS)

    Gokhberg, Alexey; Simutė, Saulė; Boehm, Christian; Fichtner, Andreas

    2016-04-01

    In the recent years the massively parallel high performance computers became the standard instruments for solving the forward and inverse problems in seismology. The respective software packages dedicated to forward and inverse waveform modelling specially designed for such computers (SPECFEM3D, SES3D) became mature and widely available. These packages achieve significant computational performance and provide researchers with an opportunity to solve problems of bigger size at higher resolution within a shorter time. However, a typical seismic inversion process contains various activities that are beyond the common solver functionality. They include management of information on seismic events and stations, 3D models, observed and synthetic seismograms, pre-processing of the observed signals, computation of misfits and adjoint sources, minimization of misfits, and process workflow management. These activities are time consuming, seldom sufficiently automated, and therefore represent a bottleneck that can substantially offset performance benefits provided by even the most powerful modern supercomputers. Furthermore, a typical system architecture of modern supercomputing platforms is oriented towards the maximum computational performance and provides limited standard facilities for automation of the supporting activities. We present a prototype solution that automates all aspects of the seismic inversion process and is tuned for the modern massively parallel high performance computing systems. We address several major aspects of the solution architecture, which include (1) design of an inversion state database for tracing all relevant aspects of the entire solution process, (2) design of an extensible workflow management framework, (3) integration with wave propagation solvers, (4) integration with optimization packages, (5) computation of misfits and adjoint sources, and (6) process monitoring. The inversion state database represents a hierarchical structure with branches for the static process setup, inversion iterations, and solver runs, each branch specifying information at the event, station and channel levels. The workflow management framework is based on an embedded scripting engine that allows definition of various workflow scenarios using a high-level scripting language and provides access to all available inversion components represented as standard library functions. At present the SES3D wave propagation solver is integrated in the solution; the work is in progress for interfacing with SPECFEM3D. A separate framework is designed for interoperability with an optimization module; the workflow manager and optimization process run in parallel and cooperate by exchanging messages according to a specially designed protocol. A library of high-performance modules implementing signal pre-processing, misfit and adjoint computations according to established good practices is included. Monitoring is based on information stored in the inversion state database and at present implements a command line interface; design of a graphical user interface is in progress. The software design fits well into the common massively parallel system architecture featuring a large number of computational nodes running distributed applications under control of batch-oriented resource managers. The solution prototype has been implemented on the "Piz Daint" supercomputer provided by the Swiss Supercomputing Centre (CSCS).

  2. Summary of Results from the Risk Management Program for the Mars Microrover Flight Experiment

    NASA Technical Reports Server (NTRS)

    Shishko, Robert; Matijevic, Jacob R.

    2000-01-01

    On 4 July 1997, the Mars Pathfinder landed on the surface of Mars carrying the first planetary rover, known as the Sojourner. Formally known as the Microrover Flight Experiment (MFEX), the Sojourner was a low cost, high-risk technology demonstration, in which new risk management techniques were tried. This paper summarizes the activities and results of the effort to conduct a low-cost, yet meaningful risk management program for the MFEX. The specific activities focused on cost, performance, schedule, and operations risks. Just as the systems engineering process was iterative and produced successive refinements of requirements, designs, etc., so was the risk management process. Qualitative risk assessments were performed first to gain some insights for refining the microrover design and operations concept. These then evolved into more quantitative analyses. Risk management lessons from the manager's perspective is presented for other low-cost, high-risk space missions.

  3. Designing the safety of healthcare. Participation of ergonomics to the design of cooperative systems in radiotherapy.

    PubMed

    Munoz, Maria Isabel; Bouldi, Nadia; Barcellini, Flore; Nascimento, Adelaide

    2012-01-01

    This communication deals with the involvement of ergonomists in a research-action design process of a software platform in radiotherapy. The goal of the design project is to enhance patient safety by designing a workflow software that supports cooperation between professionals producing treatment in radiotherapy. The general framework of our approach is the ergonomics management of a design process, which is based in activity analysis and grounded in participatory design. Two fields are concerned by the present action: a design environment which is a participatory design process that involves software designers, caregivers as future users and ergonomists; and a reference real work setting in radiotherapy. Observations, semi-structured interviews and participatory workshops allow the characterization of activity in radiotherapy dealing with uses of cooperative tools, sources of variability and non-ruled strategies to manage the variability of the situations. This production of knowledge about work searches to enhance the articulation between technocentric and anthropocentric approaches, and helps in clarifying design requirements. An issue of this research-action is to develop a framework to define the parameters of the workflow tool, and the conditions of its deployment.

  4. Radiology information system: a workflow-based approach.

    PubMed

    Zhang, Jinyan; Lu, Xudong; Nie, Hongchao; Huang, Zhengxing; van der Aalst, W M P

    2009-09-01

    Introducing workflow management technology in healthcare seems to be prospective in dealing with the problem that the current healthcare Information Systems cannot provide sufficient support for the process management, although several challenges still exist. The purpose of this paper is to study the method of developing workflow-based information system in radiology department as a use case. First, a workflow model of typical radiology process was established. Second, based on the model, the system could be designed and implemented as a group of loosely coupled components. Each component corresponded to one task in the process and could be assembled by the workflow management system. The legacy systems could be taken as special components, which also corresponded to the tasks and were integrated through transferring non-work- flow-aware interfaces to the standard ones. Finally, a workflow dashboard was designed and implemented to provide an integral view of radiology processes. The workflow-based Radiology Information System was deployed in the radiology department of Zhejiang Chinese Medicine Hospital in China. The results showed that it could be adjusted flexibly in response to the needs of changing process, and enhance the process management in the department. It can also provide a more workflow-aware integration method, comparing with other methods such as IHE-based ones. The workflow-based approach is a new method of developing radiology information system with more flexibility, more functionalities of process management and more workflow-aware integration. The work of this paper is an initial endeavor for introducing workflow management technology in healthcare.

  5. The intelligent user interface for NASA's advanced information management systems

    NASA Technical Reports Server (NTRS)

    Campbell, William J.; Short, Nicholas, Jr.; Rolofs, Larry H.; Wattawa, Scott L.

    1987-01-01

    NASA has initiated the Intelligent Data Management Project to design and develop advanced information management systems. The project's primary goal is to formulate, design and develop advanced information systems that are capable of supporting the agency's future space research and operational information management needs. The first effort of the project was the development of a prototype Intelligent User Interface to an operational scientific database, using expert systems and natural language processing technologies. An overview of Intelligent User Interface formulation and development is given.

  6. More Stamina, a Gamified mHealth Solution for Persons with Multiple Sclerosis: Research Through Design.

    PubMed

    Giunti, Guido; Mylonopoulou, Vasiliki; Rivera Romero, Octavio

    2018-03-02

    Multiple sclerosis (MS) is one of the world's most common neurologic disorders. Fatigue is one of most common symptoms that persons with MS experience, having significant impact on their quality of life and limiting their activity levels. Self-management strategies are used to support them in the care of their health. Mobile health (mHealth) solutions are a way to offer persons with chronic conditions tools to successfully manage their symptoms and problems. Gamification is a current trend among mHealth apps used to create engaging user experiences and is suggested to be effective for behavioral change. To be effective, mHealth solutions need to be designed to specifically meet the intended audience needs. User-centered design (UCD) is a design philosophy that proposes placing end users' needs and characteristics in the center of design and development, involving users early in the different phases of the software life cycle. There is a current gap in mHealth apps for persons with MS, which presents an interesting area to explore. The purpose of this study was to describe the design and evaluation process of a gamified mHealth solution for behavioral change in persons with MS using UCD. Building on previous work of our team where we identified needs, barriers, and facilitators for mHealth apps for persons with MS, we followed UCD to design and evaluate a mobile app prototype aimed to help persons with MS self-manage their fatigue. Design decisions were evidence-driven and guided by behavioral change models (BCM). Usability was assessed through inspection methods using Nielsen's heuristic evaluation. The mHealth solution More Stamina was designed. It is a task organization tool designed to help persons with MS manage their energy to minimize the impact of fatigue in their day-to-day life. The tool acts as a to-do list where users can input tasks in a simple manner and assign Stamina Credits, a representation of perceived effort, to the task to help energy management and energy profiling. The app also features personalization and positive feedback. The design process gave way to relevant lessons to the design of a gamified behavioral change mHealth app such as the importance of metaphors in concept design, negotiate requirements with the BCM constructs, and tailoring of gamified experiences among others. Several usability problems were discovered during heuristic evaluation and guided the iterative design of our solution. In this paper, we designed an app targeted for helping persons with MS in their fatigue management needs. We illustrate how UCD can help in designing mHealth apps and the benefits and challenges that designers might face when using this approach. This paper provides insight into the design process of gamified behavioral change mHealth apps and the negotiation process implied in it. ©Guido Giunti, Vasiliki Mylonopoulou, Octavio Rivera Romero. Originally published in JMIR Mhealth and Uhealth (http://mhealth.jmir.org), 02.03.2018.

  7. More Stamina, a Gamified mHealth Solution for Persons with Multiple Sclerosis: Research Through Design

    PubMed Central

    Mylonopoulou, Vasiliki; Rivera Romero, Octavio

    2018-01-01

    Background Multiple sclerosis (MS) is one of the world’s most common neurologic disorders. Fatigue is one of most common symptoms that persons with MS experience, having significant impact on their quality of life and limiting their activity levels. Self-management strategies are used to support them in the care of their health. Mobile health (mHealth) solutions are a way to offer persons with chronic conditions tools to successfully manage their symptoms and problems. Gamification is a current trend among mHealth apps used to create engaging user experiences and is suggested to be effective for behavioral change. To be effective, mHealth solutions need to be designed to specifically meet the intended audience needs. User-centered design (UCD) is a design philosophy that proposes placing end users’ needs and characteristics in the center of design and development, involving users early in the different phases of the software life cycle. There is a current gap in mHealth apps for persons with MS, which presents an interesting area to explore. Objective The purpose of this study was to describe the design and evaluation process of a gamified mHealth solution for behavioral change in persons with MS using UCD. Methods Building on previous work of our team where we identified needs, barriers, and facilitators for mHealth apps for persons with MS, we followed UCD to design and evaluate a mobile app prototype aimed to help persons with MS self-manage their fatigue. Design decisions were evidence-driven and guided by behavioral change models (BCM). Usability was assessed through inspection methods using Nielsen’s heuristic evaluation. Results The mHealth solution More Stamina was designed. It is a task organization tool designed to help persons with MS manage their energy to minimize the impact of fatigue in their day-to-day life. The tool acts as a to-do list where users can input tasks in a simple manner and assign Stamina Credits, a representation of perceived effort, to the task to help energy management and energy profiling. The app also features personalization and positive feedback. The design process gave way to relevant lessons to the design of a gamified behavioral change mHealth app such as the importance of metaphors in concept design, negotiate requirements with the BCM constructs, and tailoring of gamified experiences among others. Several usability problems were discovered during heuristic evaluation and guided the iterative design of our solution. Conclusions In this paper, we designed an app targeted for helping persons with MS in their fatigue management needs. We illustrate how UCD can help in designing mHealth apps and the benefits and challenges that designers might face when using this approach. This paper provides insight into the design process of gamified behavioral change mHealth apps and the negotiation process implied in it. PMID:29500159

  8. High School Students' Compositions of Ranch Designs: Implications for Academic and Personal Achievement

    ERIC Educational Resources Information Center

    Smagorinsky, Peter; Pettis, Victoria; Reed, Patty

    2004-01-01

    This research analyzed the composing processes of two high school students designing horse ranch plans for a course in equine management and production. The investigation focused on understanding the problems driving the design process, the tools through which the students inscribed and encoded meaning in their compositions, and the integration,…

  9. The research and realization of digital management platform for ultra-precision optical elements within life-cycle

    NASA Astrophysics Data System (ADS)

    Wang, Juan; Wang, Jian; Li, Lijuan; Zhou, Kun

    2014-08-01

    In order to solve the information fusion, process integration, collaborative design and manufacturing for ultra-precision optical elements within life-cycle management, this paper presents a digital management platform which is based on product data and business processes by adopting the modern manufacturing technique, information technique and modern management technique. The architecture and system integration of the digital management platform are discussed in this paper. The digital management platform can realize information sharing and interaction for information-flow, control-flow and value-stream from user's needs to offline in life-cycle, and it can also enhance process control, collaborative research and service ability of ultra-precision optical elements.

  10. Building a bonfire that remains stoked: sustainment of a contingency management intervention developed through collaborative design.

    PubMed

    Hartzler, Bryan

    2015-08-06

    Community dissemination of empirically-supported behavior therapies is fostered by collaborative design, a joint process pooling expertise of purveyors and treatment personnel to contextualize a therapy for sustainable use. The adaptability of contingency management renders it an exemplary therapy to model this collaborative design process. At conclusion of an implementation/effectiveness hybrid trial conducted at an opiate treatment program, a group elicitation interview was conducted with the setting's five managerial staff to cull qualitative impressions of a collaboratively-designed contingency management intervention after 90 days of provisional implementation in the setting. Two independent raters reviewed the audio-recording and conducted a phenomenological narrative analysis, extracting themes and selecting excerpts to correspond with innovation attributes (i.e., relative advantage, compatibility, complexity, trialability, observability) of a well-known implementation science framework. This qualitative analysis suggested the intervention was regarded as: (1) cost-effective and clinically useful relative to prior practices, (2) a strong fit with existing service structure and staffing resources, (3) procedurally uncomplicated, with staff consistently implementing it as intended, (4) providing site-specific data to sufficiently inform decisions about its sustainment, and (5) offering palpable benefits to staff-patient interactions. The current work complements prior reports of positive implementation outcomes and intervention effectiveness for the parent trial, mapping qualitative managerial accounts of this contingency management intervention to a set of attributes thought to influence the speed and effectiveness with which an innovative practice is disseminated. Findings support the incorporation of collaborative design processes in future efforts to transport contingency management to the addiction treatment community.

  11. High-volume workflow management in the ITN/FBI system

    NASA Astrophysics Data System (ADS)

    Paulson, Thomas L.

    1997-02-01

    The Identification Tasking and Networking (ITN) Federal Bureau of Investigation system will manage the processing of more than 70,000 submissions per day. The workflow manager controls the routing of each submission through a combination of automated and manual processing steps whose exact sequence is dynamically determined by the results at each step. For most submissions, one or more of the steps involve the visual comparison of fingerprint images. The ITN workflow manager is implemented within a scaleable client/server architecture. The paper describes the key aspects of the ITN workflow manager design which allow the high volume of daily processing to be successfully accomplished.

  12. Closed Loop Requirements and Analysis Management

    NASA Technical Reports Server (NTRS)

    Lamoreaux, Michael; Verhoef, Brett

    2015-01-01

    Effective systems engineering involves the use of analysis in the derivation of requirements and verification of designs against those requirements. The initial development of requirements often depends on analysis for the technical definition of specific aspects of a product. Following the allocation of system-level requirements to a product's components, the closure of those requirements often involves analytical approaches to verify that the requirement criteria have been satisfied. Meanwhile, changes that occur in between these two processes need to be managed in order to achieve a closed-loop requirement derivation/verification process. Herein are presented concepts for employing emerging Team center capabilities to jointly manage requirements and analysis data such that analytical techniques are utilized to effectively derive and allocate requirements, analyses are consulted and updated during the change evaluation processes, and analyses are leveraged during the design verification process. Recommendations on concept validation case studies are also discussed.

  13. How Preferences for Public Participation are Linked to Perceptions of the Context, Preferences for Outcomes, and Individual Characteristics

    NASA Astrophysics Data System (ADS)

    Tuler, Seth; Webler, Thomas

    2010-08-01

    Practitioners and stakeholders involved in environmental and risk assessment and decision-making efforts have access to a growing list of policies and guidance for implementing good process. The advice is often general. There is little understanding of how situation specific features are relevant in new circumstances. In a series of ten case studies we investigated how people’s (a) perceptions of the context, (b) preferences for outcomes, and (c) affiliations, experiences and motivations are related to their preferences for process features in a particular situation. The cases are in three policy areas: watershed management, forestry management, and clean-up and public health management of radioactively contaminated sites. We conclude this paper with a discussion of how the results can inform process design. Process design should be based on a diagnostic approach that specifically assesses relevant situational characteristics.

  14. Use of Appreciative Inquiry To Engage Parents as Codesigners of a Weight Management Intervention for Adolescents

    PubMed Central

    Killion, Cheryl M.; Andrisin, Sharon; Lissemore, Frances; Primm, Tonia; Olayinka, Oluwatomisin; Borawski, Elaine A.

    2017-01-01

    Abstract Background: Focus groups are often used to involve families as codesigners of weight management interventions. Focus groups, however, are seldom designed to elicit families' strengths and positive experiences. The purpose of this study was to describe the use of the Appreciative Inquiry process in the conduct of focus groups to engage families in the design of a weight management intervention for adolescents. Methods: A convenience sample of 44 parents (84% female; 82% minority) of adolescent children with a BMI ≥ 85th percentile, who were in the 6th–8th grade in a large urban school, participated in focus groups designed to elicit family-positive experiences and strengths regarding healthy living. A structured set of questions based on the Appreciative Inquiry process was used in the focus groups. Analyses consisted of the constant comparative method to generate themes. Results: Parent-positive perceptions regarding their family's healthy living habits were reflected in five themes: (1) Having healthy children is a joy; (2) Becoming healthy is a process; (3) Engaging in healthy habits is a family affair; (4) Good health habits can be achieved despite obstacles; and (5) School, community, and social factors contribute to their family's health habits. Parents generated ideas to improve their families' health. Conclusions: Focus groups based on the Appreciative Inquiry process were found to be a useful approach to discover features that are important to low-income, urban-living parents to include in an adolescent weight management program. Recommendations for designing and conducting focus groups based on the Appreciative Inquiry process are provided. PMID:28187267

  15. The clinical nurse specialist as resuscitation process manager.

    PubMed

    Schneiderhahn, Mary Elizabeth; Fish, Anne Folta

    2014-01-01

    The purpose of this article was to describe the history and leadership dimensions of the role of resuscitation process manager and provide specific examples of how this role is implemented at a Midwest medical center. In 1992, a medical center in the Midwest needed a nurse to manage resuscitation care. This role designation meant that this nurse became central to all quality improvement efforts in resuscitation care. The role expanded as clinical resuscitation guidelines were updated and as the medical center grew. The role became known as the critical care clinical nurse specialist as resuscitation process manager. This clinical care nurse specialist was called a manager, but she had no direct line authority, so she accomplished her objectives by forming a multitude of collaborative networks. Based on a framework by Finkelman, the manager role incorporated specific leadership abilities in quality improvement: (1) coordination of medical center-wide resuscitation, (2) use of interprofessional teams, (3) integration of evidence into practice, and (4) staff coaching to develop leadership. The manager coordinates resuscitation care with the goals of prevention of arrests if possible, efficient and effective implementation of resuscitation protocols, high quality of patient and family support during and after the resuscitation event, and creation or revision of resuscitation policies for in-hospital and for ambulatory care areas. The manager designs a comprehensive set of meaningful and measurable process and outcome indicators with input from interprofessional teams. The manager engages staff in learning, reflecting on care given, and using the evidence base for resuscitation care. Finally, the manager role is a balance between leading quality improvement efforts and coaching staff to implement and sustain these quality improvement initiatives. Revisions to clinical guidelines for resuscitation care since the 1990s have resulted in medical centers developing improved resuscitation processes that require management. The manager enhances collaborative quality improvement efforts that are in line with Institute of Medicine recommendations. The role of resuscitation process manager may be of interest to medical centers striving for excellence in evidence-based resuscitation care.

  16. Process Management inside ATLAS DAQ

    NASA Astrophysics Data System (ADS)

    Alexandrov, I.; Amorim, A.; Badescu, E.; Burckhart-Chromek, D.; Caprini, M.; Dobson, M.; Duval, P. Y.; Hart, R.; Jones, R.; Kazarov, A.; Kolos, S.; Kotov, V.; Liko, D.; Lucio, L.; Mapelli, L.; Mineev, M.; Moneta, L.; Nassiakou, M.; Pedro, L.; Ribeiro, A.; Roumiantsev, V.; Ryabov, Y.; Schweiger, D.; Soloviev, I.; Wolters, H.

    2002-10-01

    The Process Management component of the online software of the future ATLAS experiment data acquisition system is presented. The purpose of the Process Manager is to perform basic job control of the software components of the data acquisition system. It is capable of starting, stopping and monitoring the status of those components on the data acquisition processors independent of the underlying operating system. Its architecture is designed on the basis of a server client model using CORBA based communication. The server part relies on C++ software agent objects acting as an interface between the local operating system and client applications. Some of the major design challenges of the software agents were to achieve the maximum degree of autonomy possible, to create processes aware of dynamic conditions in their environment and with the ability to determine corresponding actions. Issues such as the performance of the agents in terms of time needed for process creation and destruction, the scalability of the system taking into consideration the final ATLAS configuration and minimizing the use of hardware resources were also of critical importance. Besides the details given on the architecture and the implementation, we also present scalability and performance tests results of the Process Manager system.

  17. A Model for Effective Performance in the Indonesian Navy.

    DTIC Science & Technology

    1987-06-01

    Navy LMET I AWBRAC’ (COAGAU0 OAl reVerie of necoiuary and .dfmtk by block num"ber) 7,- This thesis describes a process of designing a management ...effective from ineffective manager . In the process of building the model two main steps are taken. First, a literature study of the empirical analysis of... management competencies was conducted to identify management competencies in the United States in general and the U.S. Navy in particular. Second, a

  18. The Assessment of Change in Training and Therapy.

    ERIC Educational Resources Information Center

    Belasco, James A.; Trice, Harrison M.

    Designed to serve training oriented professionals, therapy oriented practitioners, and practicing managers, this book presents insights into the change process, along with problems contained in efforts to evaluate this process in management training and in therapy. First, the four essential strategic problems of evaluation are set forth: setting…

  19. Improving Program Performance through Management Information. A Workbook.

    ERIC Educational Resources Information Center

    Bienia, Nancy

    Designed specifically for state and local managers and supervisors who plan, direct, and operate child support enforcement programs, this workbook provides a four-part, step-by-step process for identifying needed information and methods of using the information to operate an effective program. The process consists of: (1) determining what…

  20. Using task analysis to improve the requirements elicitation in health information system.

    PubMed

    Teixeira, Leonor; Ferreira, Carlos; Santos, Beatriz Sousa

    2007-01-01

    This paper describes the application of task analysis within the design process of a Web-based information system for managing clinical information in hemophilia care, in order to improve the requirements elicitation and, consequently, to validate the domain model obtained in a previous phase of the design process (system analysis). The use of task analysis in this case proved to be a practical and efficient way to improve the requirements engineering process by involving users in the design process.

  1. Visit from JAXA to NASA MSFC: The Engines Element & Ideas for Collaboration

    NASA Technical Reports Server (NTRS)

    Greene, William D.

    2013-01-01

    System Design, Development, and Fabrication: Design, develop, and fabricate or procure MB-60 component hardware compliant with the imposed technical requirements and in sufficient quantities to fulfill the overall MB-60 development effort. System Development, Assembly, and Test: Manage the scope of the development, assembly, and test-related activities for MB-60 development. This scope includes engine-level development planning, engine assembly and disassembly, test planning, engine testing, inspection, anomaly resolution, and development of necessary ground support equipment and special test equipment. System Integration: Provide coordinated integration in the realms of engineering, safety, quality, and manufacturing disciplines across the scope of the MB-60 design and associated products development Safety and Mission Assurance, structural design, fracture control, materials and processes, thermal analysis. Systems Engineering and Analysis: Manage and perform Systems Engineering and Analysis to provide rigor and structure to the overall design and development effort for the MB-60. Milestone reviews, requirements management, system analysis, program management support Program Management: Manage, plan, and coordinate the activities across all portions of the MB-60 work scope by providing direction for program administration, business management, and supplier management.

  2. Scenario-based design: A method for connecting information system design with public health operations and emergency management

    PubMed Central

    Reeder, Blaine; Turner, Anne M

    2011-01-01

    Responding to public health emergencies requires rapid and accurate assessment of workforce availability under adverse and changing circumstances. However, public health information systems to support resource management during both routine and emergency operations are currently lacking. We applied scenario-based design as an approach to engage public health practitioners in the creation and validation of an information design to support routine and emergency public health activities. Methods: Using semi-structured interviews we identified the information needs and activities of senior public health managers of a large municipal health department during routine and emergency operations. Results: Interview analysis identified twenty-five information needs for public health operations management. The identified information needs were used in conjunction with scenario-based design to create twenty-five scenarios of use and a public health manager persona. Scenarios of use and persona were validated and modified based on follow-up surveys with study participants. Scenarios were used to test and gain feedback on a pilot information system. Conclusion: The method of scenario-based design was applied to represent the resource management needs of senior-level public health managers under routine and disaster settings. Scenario-based design can be a useful tool for engaging public health practitioners in the design process and to validate an information system design. PMID:21807120

  3. A Study on Applying the Concept of Innovation Management to Accounting Curriculum

    ERIC Educational Resources Information Center

    Cheng, Kai-Wen

    2008-01-01

    This study introduces the concept of innovation management into curriculum design through a 4-month teaching project. Through this process, constant review and modification, and continuous analyses and verifications, two conclusions were obtained: (1) The design of teaching content should be oriented to thinking, sharing, and transfer of learning;…

  4. Principles for ecologically based invasive plant management

    Treesearch

    Jeremy J. James; Brenda S. Smith; Edward A. Vasquez; Roger L. Sheley

    2010-01-01

    Land managers have long identified a critical need for a practical and effective framework for designing restoration strategies, especially where invasive plants dominate. A holistic, ecologically based, invasive plant management (EBIPM) framework that integrates ecosystem health assessment, knowledge of ecological processes, and adaptive management into a successional...

  5. The visual information system

    Treesearch

    Merlyn J. Paulson

    1979-01-01

    This paper outlines a project level process (V.I.S.) which utilizes very accurate and flexible computer algorithms in combination with contemporary site analysis and design techniques for visual evaluation, design and management. The process provides logical direction and connecting bridges through problem identification, information collection and verification, visual...

  6. Web Based Personal Nutrition Management Tool

    NASA Astrophysics Data System (ADS)

    Bozkurt, Selen; Zayim, Neşe; Gülkesen, Kemal Hakan; Samur, Mehmet Kemal

    Internet is being used increasingly as a resource for accessing health-related information because of its several advantages. Therefore, Internet tailoring becomes quite preferable in health education and personal health management recently. Today, there are many web based health programs de-signed for individuals. Among these studies nutrition and weight management is popular because, obesity has become a heavy burden for populations worldwide. In this study, we designed a web based personal nutrition education and management tool, The Nutrition Web Portal, in order to enhance patients’ nutrition knowledge, and provide behavioral change against obesity. The present paper reports analysis, design and development processes of The Nutrition Web Portal.

  7. Survival tactics for managing the hospital marketing effort.

    PubMed

    Schaupp, D L; Ponzurick, T G; Schaupp, F W

    1994-01-01

    Hospital marketing is an intricate and complex process. Especially difficult is the transition the hospital marketer must make from designing marketing strategies to implementing those strategies. This transition usually causes the marketer to call upon a different set of skills. These skills involve managing the personnel needed to implement the designed marketing strategy. Unfortunately, little in the way of formal training is provided the marketer for developing these management skills. Therefore, the authors have comprised a series of tactical procedures designed to assist the hospital marketer to survive this transition. Using these tactics for decision-making guidelines may help to improve the management of the hospital's marketing effort.

  8. Power management and distribution considerations for a lunar base

    NASA Technical Reports Server (NTRS)

    Kenny, Barbara H.; Coleman, Anthony S.

    1991-01-01

    Design philosophies and technology needs for the power management and distribution (PMAD) portion of a lunar base power system are discussed. A process is described whereby mission planners may proceed from a knowledge of the PMAD functions and mission performance requirements to a definition of design options and technology needs. Current research efforts at the NASA LRC to meet the PMAD system needs for a Lunar base are described. Based on the requirements, the lunar base PMAD is seen as best being accomplished by a utility like system, although with some additional demands including autonomous operation and scheduling and accurate, predictive modeling during the design process.

  9. Design of workshops in air quality management for senior managers in Mexico (Taller de la calidad del aire para mandos superiores)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Auberle, W.M.; Alvarez, V.M.; Leary, J.

    1999-07-01

    A collaborative program among agencies and professionals in Mexico and the US is designing, developing and delivering specialized workshops for Mexican officials responsible for air quality management. The initial project is development and pilot delivery (Spring 1999) of a workshop for senior officials of SEMARNAP plus selected state and municipal officials. This paper describes the process for design of professional development programs in air quality management for Mexican officials. Key issues include optimum learning styles and delivery techniques; available time of senior managers for education; need for new materials versus adaptation of existing air quality management information; and utilization ofmore » the Internet and asynchronous methods to supplement the traditional workshop format. The paper describes the results of this analysis and design features and content of the initial workshop.« less

  10. The six critical attributes of the next generation of quality management software systems.

    PubMed

    Clark, Kathleen

    2011-07-01

    Driven by both the need to meet regulatory requirements and a genuine desire to drive improved quality, quality management systems encompassing standard operating procedure, corrective and preventative actions and related processes have existed for many years, both in paper and electronic form. The impact of quality management systems on 'actual' quality, however, is often reported as far less than desired. A quality management software system that moves beyond formal forms-driven processes to include a true closed loop design, manage disparate processes across the enterprise, provide support for collaborative processes and deliver insight into the overall state of control has the potential to close the gap between simply accomplishing regulatory compliance and delivering measurable improvements in quality and efficiency.

  11. Survey process quality: a question of healthcare manager approach.

    PubMed

    Nilsson, Petra; Blomqvist, Kerstin

    2017-08-14

    Purpose The purpose of this paper is to explore how healthcare first-line managers think about and act regarding workplace survey processes. Design/methodology/approach This interview study was performed at a hospital in south Sweden. First-line healthcare managers ( n=24) volunteered. The analysis was inspired by phenomenography, which aims to describe the ways in which different people experience a phenomenon. The phenomenon was a workplace health promotion (WHP) survey processes. Findings Four main WHP survey process approaches were identified among the managers: as a possibility, as a competition, as a work task among others and as an imposition. For each, three common subcategories emerged; how managers: stated challenges and support from hospital management; described their own work group and collaboration with other managers; and expressed themselves and their situation in their roles as first-line managers. Practical implications Insights into how hospital management can understand their first-line managers' motivation for survey processes and practical suggestions and how managers can work proactively at organizational, group and individual level are presented. Originality/value Usually these studies focus on those who should respond to a survey; not those who should run the survey process. Focusing on managers and not co-workers can lead to more committed and empowered managers and thereby success in survey processes.

  12. Design and practice of a comprehensively functional integrated management information system for major construction

    NASA Astrophysics Data System (ADS)

    Liu, Yuling; Wang, Xiaoping; Zhu, Yuhui; Fei, Lanlan

    2017-08-01

    This paper introduces a Comprehensively Functional Integrated Management Information System designed for the Optical Engineering Major by the College of Optical Science and Engineering, Zhejiang University, which combines the functions of teaching, students learning, educational assessment and management. The system consists of 5 modules, major overview, online curriculum, experiment teaching management, graduation project management and teaching quality feedback. The major overview module introduces the development history, training program, curriculums and experiment syllabus and teaching achievements of optical engineering major in Zhejiang University. The Management Information System is convenient for students to learn in a mobile and personalized way. The online curriculum module makes it very easy for teachers to setup a website for new curriculums. On the website, teachers can help students on their problems about the curriculums in time and collect their homework online. The experiment teaching management module and the graduation project management module enables the students to fulfill their experiment process and graduation thesis under the help of their supervisors. Before students take an experiment in the lab, they must pass the pre-experiment quiz on the corresponding module. After the experiment, students need to submit the experiment report to the web server. Moreover, the module contains experiment process video recordings, which are very helpful to improve the effect of the experiment education. The management of the entire process of a student's graduation program, including the project selection, mid-term inspection, progress report of every two weeks, final thesis, et al, is completed by the graduation project management module. The teaching quality feedback module is not only helpful for teachers to know whether the education effect of curriculum is good or not, but also helpful for the administrators of the college to know whether the design of syllabus is reasonable or not. The Management Information System changes the management object from the education results to the entire education processes. And it improves the efficiency of the management. It provides an effective method to promote curriculum construction management by supervision and evaluation, which improves students' learning outcomes and the quality of curriculums. As a result, it promotes the quality system of education obviously.

  13. Management Systems, Patient Quality Improvement, Resource Availability, and Substance Abuse Treatment Quality

    PubMed Central

    Fields, Dail; Roman, Paul M; Blum, Terry C

    2012-01-01

    Objective To examine the relationships among general management systems, patient-focused quality management/continuous process improvement (TQM/CPI) processes, resource availability, and multiple dimensions of substance use disorder (SUD) treatment. Data Sources/Study Setting Data are from a nationally representative sample of 221 SUD treatment centers through the National Treatment Center Study (NTCS). Study Design The design was a cross-sectional field study using latent variable structural equation models. The key variables are management practices, TQM/continuous quality improvement (CQI) practices, resource availability, and treatment center performance. Data Collection Interviews and questionnaires provided data from treatment center administrative directors and clinical directors in 2007–2008. Principal Findings Patient-focused TQM/CQI practices fully mediated the relationship between internal management practices and performance. The effects of TQM/CQI on performance are significantly larger for treatment centers with higher levels of staff per patient. Conclusions Internal management practices may create a setting that supports implementation of specific patient-focused practices and protocols inherent to TQM/CQI processes. However, the positive effects of internal management practices on treatment center performance occur through use of specific patient-focused TQM/CPI practices and have more impact when greater amounts of supporting resources are present. PMID:22098342

  14. Leading processes of patient care and treatment in hierarchical healthcare organizations in Sweden--process managers' experiences.

    PubMed

    Nilsson, Kerstin; Sandoff, Mette

    2015-01-01

    The purpose of this study is to gain better understanding of the roles and functions of process managers by describing Swedish process managers' experiences of leading processes involving patient care and treatment when working in a hierarchical health-care organization. This study is based on an explorative design. The data were gathered from interviews with 12 process managers at three Swedish hospitals. These data underwent qualitative and interpretative analysis with a modified editing style. The process managers' experiences of leading processes in a hierarchical health-care organization are described under three themes: having or not having a mandate, exposure to conflict situations and leading process development. The results indicate a need for clarity regarding process manager's responsibility and work content, which need to be communicated to all managers and staff involved in the patient care and treatment process, irrespective of department. There also needs to be an emphasis on realistic expectations and orientation of the goals that are an intrinsic part of the task of being a process manager. Generalizations from the results of the qualitative interview studies are limited, but a deeper understanding of the phenomenon was reached, which, in turn, can be transferred to similar settings. This study contributes qualitative descriptions of leading care and treatment processes in a functional, hierarchical health-care organization from process managers' experiences, a subject that has not been investigated earlier.

  15. Spitzer Telemetry Processing System

    NASA Technical Reports Server (NTRS)

    Stanboli, Alice; Martinez, Elmain M.; McAuley, James M.

    2013-01-01

    The Spitzer Telemetry Processing System (SirtfTlmProc) was designed to address objectives of JPL's Multi-mission Image Processing Lab (MIPL) in processing spacecraft telemetry and distributing the resulting data to the science community. To minimize costs and maximize operability, the software design focused on automated error recovery, performance, and information management. The system processes telemetry from the Spitzer spacecraft and delivers Level 0 products to the Spitzer Science Center. SirtfTlmProc is a unique system with automated error notification and recovery, with a real-time continuous service that can go quiescent after periods of inactivity. The software can process 2 GB of telemetry and deliver Level 0 science products to the end user in four hours. It provides analysis tools so the operator can manage the system and troubleshoot problems. It automates telemetry processing in order to reduce staffing costs.

  16. Disease management interventions: what's in the black box?

    PubMed

    Linden, Ariel; Roberts, Nancy

    2004-01-01

    In discussing evaluation techniques to assess disease management (DM) program outcomes, it is often assumed that DM program interventions are premised on sound clinical judgment, an understanding of the disease process, and knowledge of the psychosocial models of behavioral change that must be used to effect those processes and ultimately improve the health outcomes that are being evaluated. This paper describes eight commonly used behavioral change models applied in the healthcare industry today. They represent programs designed to address individual, interpersonal, and community level factors as well as "packaged" comprehensive approaches. These models illustrate the breadth of approaches to consider when designing or assessing DM program interventions. Careful consideration of the type of behavioral change desired and the theories of how to effect such change should be an integral part of designing disease management program interventions.

  17. Crew interface specification development study for in-flight maintenance and stowage functions

    NASA Technical Reports Server (NTRS)

    Carl, J. G.

    1971-01-01

    The need and potential solutions for an orderly systems engineering approach to the definition, management and documentation requirements for in-flight maintenance, assembly, servicing, and stowage process activities of the flight crews of future spacecraft were investigated. These processes were analyzed and described using a new technique (mass/function flow diagramming), developed during the study, to give visibility to crew functions and supporting requirements, including data products. This technique is usable by NASA for specification baselines and can assist the designer in identifying both upper and lower level requirements associated with these processes. These diagrams provide increased visibility into the relationships between functions and related equipments being utilized and managed and can serve as a common communicating vehicle between the designer, program management, and the operational planner. The information and data product requirements to support the above processes were identified along with optimum formats and contents of these products. The resulting data product concepts are presented to support these in-flight maintenance and stowage processes.

  18. Management of CAD/CAM information: Key to improved manufacturing productivity

    NASA Technical Reports Server (NTRS)

    Fulton, R. E.; Brainin, J.

    1984-01-01

    A key element to improved industry productivity is effective management of CAD/CAM information. To stimulate advancements in this area, a joint NASA/Navy/industry project designated Intergrated Programs for Aerospace-Vehicle Design (IPAD) is underway with the goal of raising aerospace industry productivity through advancement of technology to integrate and manage information involved in the design and manufacturing process. The project complements traditional NASA/DOD research to develop aerospace design technology and the Air Force's Integrated Computer-Aided Manufacturing (ICAM) program to advance CAM technology. IPAD research is guided by an Industry Technical Advisory Board (ITAB) composed of over 100 representatives from aerospace and computer companies.

  19. Manager`s views of public involvement

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Branch, K.M.; Heerwagen, J.; Bradbury, J.

    1995-12-01

    Four issues commonly form the framework for debates about the acceptability of proposed projects or technologies--the substantive decision or technological choice; the treatment of the community by the proponent organization; the way the decision-making process has been structured and managed; and the status of institutional safeguards and protection. One of the clear messages of cultural theory is that differences in perspectives are a normal and inevitable part of society, and that attempts to resolve differences by persuasion are not likely to work. These findings are useful when considering the goals and possibilities of public involvement as a decision-making tool, andmore » when designing or evaluating public involvement training programs for managers. The research reported here examines the viewpoints and concerns of managers and decision-makers about the four issues identified above, with particular emphasis on their perspectives and concerns about opening decision-making processes to the public and about managers` roles and responsibilities for structuring and managing open decision-making processes. Implications of these findings for public involvement training for managers is also discussed. The data presented in this paper were obtained from face-to-face interviews with managers and decision-makers with experience managing a variety of hazardous waste management decision-making processes. We conducted these interviews in the course of four separate research projects: needs assessments to support the design and development of a public involvement training program for managers; a study of community residents` and managers` perspectives on the chemical stockpile disposal program; an evaluation of the effectiveness of public involvement training for managers in the Department of Energy; and a study to develop indicators of the benefits and costs of public involvement.« less

  20. SecureCore Security Architecture: Authority Mode and Emergency Management

    DTIC Science & Technology

    2007-10-16

    can shield first responders from social vultures (e.g., “ambulance chasers”) or malicious parties who could intentionally interfere with emergency...hierarchical design Communications Management: network communication Process Management...and Emergency Management 1 I. Introduction During many crises, first- responder access to sensitive, restricted emergency information is

  1. 40 CFR 430.03 - Best management practices (BMPs) for spent pulping liquor, soap, and turpentine management, spill...

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ..., pulp washing, pulping liquor concentration, pulping liquor processing, and chemical recovery facilities... manager of pulping and chemical recovery operations, or other such responsible person designated by the mill manager who has knowledge of and responsibility for pulping and chemical recovery operations. (7...

  2. 40 CFR 430.03 - Best management practices (BMPs) for spent pulping liquor, soap, and turpentine management, spill...

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ..., pulp washing, pulping liquor concentration, pulping liquor processing, and chemical recovery facilities... manager of pulping and chemical recovery operations, or other such responsible person designated by the mill manager who has knowledge of and responsibility for pulping and chemical recovery operations. (7...

  3. Towards the Reconciliation of Knowledge Management and e-Collaboration Systems

    ERIC Educational Resources Information Center

    Le Dinh, Thang; Rinfret, Louis; Raymond, Louis; Dong Thi, Bich-Thuy

    2013-01-01

    Purpose: The purpose of this paper is to propose an intelligent infrastructure for the reconciliation of knowledge management and e-collaboration systems. Design/Methodology/Approach:Literature on e-collaboration, information management, knowledge management, learning process, and intellectual capital is mobilised in order to build the conceptual…

  4. A Conceptual Framework for Examining Knowledge Management in Higher Education Contexts

    ERIC Educational Resources Information Center

    Lee, Hae-Young; Roth, Gene L.

    2009-01-01

    Knowledge management is an on-going process that involves varied activities: diagnosis, design, and implementation of knowledge creation, knowledge transfer, and knowledge sharing. The primary goal of knowledge management, like other management theories or models, is to identify and leverage organizational and individual knowledge for the…

  5. Logical Design of a Decision Support System to Forecast Technology, Prices and Costs for the National Communications System.

    DTIC Science & Technology

    1984-09-01

    IN SOFTWARE DESIGN ......... .................... 39 P. PROCESS DESCRIPTIONS 43.............3 1. Model Euilding .............. 43 2. M1odel Management ... manager to model a wide variety of technology, price and cost situations without the associated overhead imposed by multiple application-specific systems...The Manager of the National Communications System (NCS) has been tasked by the National Security Telecommunications Policy of 3 August 1983 with

  6. Reliability design and verification for launch-vehicle propulsion systems - Report of an AIAA Workshop, Washington, DC, May 16, 17, 1989

    NASA Astrophysics Data System (ADS)

    Launch vehicle propulsion system reliability considerations during the design and verification processes are discussed. The tools available for predicting and minimizing anomalies or failure modes are described and objectives for validating advanced launch system propulsion reliability are listed. Methods for ensuring vehicle/propulsion system interface reliability are examined and improvements in the propulsion system development process are suggested to improve reliability in launch operations. Also, possible approaches to streamline the specification and procurement process are given. It is suggested that government and industry should define reliability program requirements and manage production and operations activities in a manner that provides control over reliability drivers. Also, it is recommended that sufficient funds should be invested in design, development, test, and evaluation processes to ensure that reliability is not inappropriately subordinated to other management considerations.

  7. Design of a naturalized flow regime—An example from the Lower Missouri River, USA

    USGS Publications Warehouse

    Jacobson, Robert B.; Galat, David L.

    2008-01-01

     group of river managers, stakeholders, and scientists met during summer 2005 to design a more naturalized flow regime for the Lower Missouri River (LMOR). The objective was to comply with requirements under the U.S. Endangered Species Act to support reproduction and survival of threatened and endangered species, with emphasis on the endangered pallid sturgeon (Scaphirhynchus albus), while minimizing negative effects to existing social and economic benefits of prevailing river management. Specific hydrograph requirements for pallid sturgeon reproduction are unknown, hence much of the design process was based on features of the natural flow regime. Environmental flow components (EFCs) extracted from the reference natural flow regime were used to design and assess performance of alternative flow regimes.The design process incorporated a primary stage in which conceptual hydrographs were developed and assessed for their general ecological and social-economic performance. The second stage accounted for hydroclimatic variation by coding the conceptual hydrographs into reservoir release rules, adding constraints for downstream flooding and low-storage precludes, and running the rules through 100 years of hydroclimatic simulation. The output flow regimes were then evaluated for presumed ecological benefits based on how closely they resembled EFCs in the reference natural flow regime. Flow regimes also were assessed for social-economic cost indicators, including days of flooding of low-lying agricultural land, days over flood stage, and storage levels in system reservoirs.Our experience with flow-regime design on the LMOR underscored the lack of confidence the stakeholders place in the value of the natural flow regime as a measure of ecosystem benefit in the absence of fundamental scientific documentation. Stakeholders desired proof of ecological benefits commensurate with the certainty of economic losses. We also gained insight into the processes of integrating science into a collaborative management exercise. Although the 2005 collaborative effort failed to reach a consensus among stakeholders on a naturalized flow regime, the process was successful in pilot-testing a design approach; it helped focus scienctific efforts on key knowledge gaps; and it demonstrated the potential for collaborations among scientists, stakeholders, and managers in river management decision making.

  8. HIERARCHIAL DESIGN AND EVALUATION OF PROCESSES TO GENERATE WASTE-RECYCLED FEEDS

    EPA Science Inventory

    Hierarchical Design and Evaluation of Processes to Generate
    Waste-Recycled Feeds

    Raymond L. Smith
    U.S. Environmental Protection Agency
    Office of Research and Development
    National Risk Management Research Laboratory
    26 W. Martin Luther King Drive
    Cincinna...

  9. A Map for Clinical Laboratories Management Indicators in the Intelligent Dashboard

    PubMed Central

    Azadmanjir, Zahra; Torabi, Mashallah; Safdari, Reza; Bayat, Maryam; Golmahi, Fatemeh

    2015-01-01

    Introduction: management challenges of clinical laboratories are more complicated for educational hospital clinical laboratories. Managers can use tools of business intelligence (BI), such as information dashboards that provide the possibility of intelligent decision-making and problem solving about increasing income, reducing spending, utilization management and even improving quality. Critical phase of dashboard design is setting indicators and modeling causal relations between them. The paper describes the process of creating a map for laboratory dashboard. Methods: the study is one part of an action research that begins from 2012 by innovation initiative for implementing laboratory intelligent dashboard. Laboratories management problems were determined in educational hospitals by the brainstorming sessions. Then, with regard to the problems key performance indicators (KPIs) specified. Results: the map of indicators designed in form of three layered. They have a causal relationship so that issues measured in the subsequent layers affect issues measured in the prime layers. Conclusion: the proposed indicator map can be the base of performance monitoring. However, these indicators can be modified to improve during iterations of dashboard designing process. PMID:26483593

  10. Addressing Research Design Problem in Mixed Methods Research

    NASA Astrophysics Data System (ADS)

    Alavi, Hamed; Hąbek, Patrycja

    2016-03-01

    Alongside other disciplines in social sciences, management researchers use mixed methods research more and more in conduct of their scientific investigations. Mixed methods approach can also be used in the field of production engineering. In comparison with traditional quantitative and qualitative research methods, reasons behind increasing popularity of mixed research method in management science can be traced in different factors. First of all, any particular discipline in management can be theoretically related to it. Second is that concurrent approach of mixed research method to inductive and deductive research logic provides researchers with opportunity to generate theory and test hypothesis in one study simultaneously. In addition, it provides a better justification for chosen method of investigation and higher validity for obtained answers to research questions. Despite increasing popularity of mixed research methods among management scholars, there is still need for a comprehensive approach to research design typology and process in mixed research method from the perspective of management science. The authors in this paper try to explain fundamental principles of mixed research method, its typology and different steps in its design process.

  11. Critical care nurses management of prolonged weaning: an interview study.

    PubMed

    Cederwall, Carl-Johan; Plos, Kaety; Rose, Louise; Dübeck, Amanda; Ringdal, Mona

    2014-09-01

    For most critically ill patients requiring mechanical ventilation in the intensive care unit (ICU) weaning is uncomplicated. For the remainder, weaning is a challenge and may result in further complications and increased risk of mortality. Critical care nurses (CCNs) require substantial knowledge and experience to manage patients experiencing prolonged weaning. The aim of this study was to explore CCNs approach for management of patients experiencing prolonged weaning in the ICU. A descriptive qualitative design. Semi-structured interviews with 19 experienced CCNs were conducted. Data were analysed using content analysis. Participants used various strategies for weaning that were grouped into four categories: individualized planning for the weaning process, assessing patient's capacity, managing the process and team interaction. The overall theme that emerged was: CCNs drive the weaning process using both a patient centred and targeted approach. CCNs in these ICUs performed weaning using a patient centred approach to plan, initiate, assess and establish a holistic weaning process. Team collaboration among all health care practitioners was important. CCNs have a key role in prioritizing weaning and driving the process forward. Closeness to the patient and a key role in management of the mechanical ventilated patient in ICU gives the CCN unique potential to develop and create models and tools for prolonged weaning. These tools, specially designed for patients undergoing prolonged weaning, would give focus on continuous planning, collaborating, managing and evaluation in the process of liberating patients from mechanical ventilation. © 2014 British Association of Critical Care Nurses.

  12. Towards Requirements in Systems Engineering for Aerospace IVHM Design

    NASA Technical Reports Server (NTRS)

    Saxena, Abhinav; Roychoudhury, Indranil; Lin, Wei; Goebel, Kai

    2013-01-01

    Health management (HM) technologies have been employed for safety critical system for decades, but a coherent systematic process to integrate HM into the system design is not yet clear. Consequently, in most cases, health management resorts to be an after-thought or 'band-aid' solution. Moreover, limited guidance exists for carrying out systems engineering (SE) on the subject of writing requirements for designs with integrated vehicle health management (IVHM). It is well accepted that requirements are key to developing a successful IVHM system right from the concept stage to development, verification, utilization, and support. However, writing requirements for systems with IVHM capability have unique challenges that require the designers to look beyond their own domains and consider the constraints and specifications of other interlinked systems. In this paper we look at various stages in the SE process and identify activities specific to IVHM design and development. More importantly, several relevant questions are posed that system engineers must address at various design and development stages. Addressing these questions should provide some guidance to systems engineers towards writing IVHM related requirements to ensure that appropriate IVHM functions are built into the system design.

  13. AMPS data management concepts. [Atmospheric, Magnetospheric and Plasma in Space experiment

    NASA Technical Reports Server (NTRS)

    Metzelaar, P. N.

    1975-01-01

    Five typical AMPS experiments were formulated to allow simulation studies to verify data management concepts. Design studies were conducted to analyze these experiments in terms of the applicable procedures, data processing and displaying functions. Design concepts for AMPS data management system are presented which permit both automatic repetitive measurement sequences and experimenter-controlled step-by-step procedures. Extensive use is made of a cathode ray tube display, the experimenters' alphanumeric keyboard, and the computer. The types of computer software required by the system and the possible choices of control and display procedures available to the experimenter are described for several examples. An electromagnetic wave transmission experiment illustrates the methods used to analyze data processing requirements.

  14. Earth Observatory Satellite system definition study. Report no. 3: Design/cost tradeoff studies. Appendix D: EOS configuration design data. Part 2: Data management system configuration

    NASA Technical Reports Server (NTRS)

    1974-01-01

    The Earth Observatory Satellite (EOS) data management system (DMS) is discussed. The DMS is composed of several subsystems or system elements which have basic purposes and are connected together so that the DMS can support the EOS program by providing the following: (1) payload data acquisition and recording, (2) data processing and product generation, (3) spacecraft and processing management and control, and (4) data user services. The configuration and purposes of the primary or high-data rate system and the secondary or local user system are explained. Diagrams of the systems are provided to support the systems analysis.

  15. Science, education and industry information resources complementarity as a basis for design of knowledge management systems

    NASA Astrophysics Data System (ADS)

    Maksimov, N. V.; Tikhomirov, G. V.; Golitsyna, O. L.

    2017-01-01

    The main problems and circumstances that influence the processes of creating effective knowledge management systems were described. These problems particularly include high species diversity of instruments for knowledge representation, lack of adequate lingware, including formal representation of semantic relationships. For semantic data descriptions development a conceptual model of the subject area and a conceptual-lexical system should be designed on proposals of ISO-15926 standard. It is proposed to conduct an information integration of educational and production processes on the basis of information systems technologies. Integrated knowledge management system information environment combines both traditional information resources and specific information resources of subject domain including task context and implicit/tacit knowledge.

  16. A Holistic Approach for Risk Management During Design

    NASA Technical Reports Server (NTRS)

    Meshkat, Leila

    2006-01-01

    In this paper, an approach for the identification, assessment, mitigation and continuous management of risks during the process of designing a space mission is presented. This approach has been developed by observing the risk patterns that occur at the Project Design Center of the Jet Propulsion Laboratory (TeamX) which develops conceptual, concurrent design of Space Missions. TeamX develops an end-to-end conceptual design of a Space Mission in a matter of one or two weeks. As the risk chair in TeamX, the author has had the opportunity to observe the risk patterns that occur during design over the course of many design sessions. This paper introduces an abstraction and generalization of those patterns. Risk is defined as anything that can go wrong, along with its approximate likelihood and consequence. The indicators, and causes, and effects of these risks are cross cutting across the multiple levels of people and processes involved in the design, and the actual design product itself.

  17. Salary Management System for Small and Medium-sized Enterprises

    NASA Astrophysics Data System (ADS)

    Hao, Zhang; Guangli, Xu; Yuhuan, Zhang; Yilong, Lei

    Small and Medium-sized Enterprises (SMEs) in the process of wage entry, calculation, the total number are needed to be done manually in the past, the data volume is quite large, processing speed is low, and it is easy to make error, which is resulting in low efficiency. The main purpose of writing this paper is to present the basis of salary management system, establish a scientific database, the computer payroll system, using the computer instead of a lot of past manual work in order to reduce duplication of staff labor, it will improve working efficiency.This system combines the actual needs of SMEs, through in-depth study and practice of the C/S mode, PowerBuilder10.0 development tools, databases and SQL language, Completed a payroll system needs analysis, database design, application design and development work. Wages, departments, units and personnel database file are included in this system, and have data management, department management, personnel management and other functions, through the control and management of the database query, add, delete, modify, and other functions can be realized. This system is reasonable design, a more complete function, stable operation has been tested to meet the basic needs of the work.

  18. Hydrologic processes of forested headwater watersheds across a physiographaic gradient in the southeastern United States

    Treesearch

    Ge Sun; Johnny Boggs; Steven G. McNulty; Devendra M. Amatya; Carl C. Trettin; Zhaohua Dai; James M. Vose; Ileana B. La Torre Torres; Timothy Callahan

    2008-01-01

    Understanding the hydrologic processes is the first step in making sound watershed management decisions including designing Best Management Practices for nonpoint source pollution control. Over the past fifty years, various forest experimental watersheds have been instrumented across the Carolinas through collaborative studies among federal, state, and private...

  19. WORKSHOP ON MERCURY IN PRODUCTS, PROCESSES, WASTE AND THE ENVIRONMENT: ELIMINATING, REDUCING AND MANAGING RISKS FROM NON-COMBUSTION SOURCES (PROGRAM FLYER)

    EPA Science Inventory

    The Workshop is designed to achieve three goals:
    1. Convey public and private sector perspectives on the management of mercury in products, processes, and wastes;
    2. Present ongoing efforts that address mercury prevention, elimination, noncombustion treatment and disposal; ...

  20. NIST: Information Management in the AMRF

    NASA Technical Reports Server (NTRS)

    Callaghan, George (Editor)

    1991-01-01

    The information management strategies developed for the NIST Automated Manufacturing Research Facility (AMRF) - a prototype small batch manufacturing facility used for integration and measurement related standards research are outlined in this video. The five major manufacturing functions - design, process planning, off-line programming, shop floor control, and materials processing are explained and their applications demonstrated.

  1. AOIPS water resources data management system

    NASA Technical Reports Server (NTRS)

    Merritt, E. S.; Shotwell, R. L.; Place, M. C.; Belknap, N. J.

    1976-01-01

    A geocoded data management system applicable for hydrological applications was designed to demonstrate the utility of the Atmospheric and Oceanographic Information Processing System (AOIPS) for hydrological applications. Within that context, the geocoded hydrology data management system was designed to take advantage of the interactive capability of the AOIPS hardware. Portions of the Water Resource Data Management System which best demonstrate the interactive nature of the hydrology data management system were implemented on the AOIPS. A hydrological case study was prepared using all data supplied for the Bear River watershed located in northwest Utah, southeast Idaho, and western Wyoming.

  2. Demonstrating and Evaluating an Action Learning Approach to Building Project Management Competence

    NASA Technical Reports Server (NTRS)

    Kotnour, Tim; Starr, Stan; Steinrock, T. (Technical Monitor)

    2001-01-01

    This paper contributes a description of an action-learning approach to building project management competence. This approach was designed, implemented, and evaluated for use with the Dynacs Engineering Development Contract at the Kennedy Space Center. The aim of the approach was to improve three levels of competence within the organization: individual project management skills, project team performance. and organizational capabilities such as the project management process and tools. The overall steps to the approach, evaluation results, and lessons learned are presented. Managers can use this paper to design a specific action-learning approach for their organization.

  3. Management of radioactive waste in Belgium: ONDRAF/NIRAS and Belgoprocess as major actors of the waste acceptance system

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Zaelen, Gunter van; Verheyen, Annick

    2007-07-01

    The management of radioactive waste in Belgium is undertaken by the national agency for radioactive waste and enriched fissile materials, ONDRAF/NIRAS, and its industrial partner Belgoprocess. ONDRAF/NIRAS has set up a management system designed to guarantee that the general public and the environment are protected against the potential hazards arising from radioactive waste. Belgoprocess is a private company, founded in 1984 and located in Dessel, Belgium. It is a subsidiary of ONDRAF/NIRAS and its activities focus on the safe processing and storage of radioactive waste. The management system of ONDRAF/NIRAS includes two aspects: a) an integrated system and b) anmore » acceptance system. The integrated system covers all aspects of management ranging from the origin of waste to its transport, processing, interim storage and long-term management. The safety of radioactive waste management not only depends on the quality of the design and construction of the processing, temporary storage or disposal infrastructure, but also on the quality of the waste accepted by ONDRAF/NIRAS. In order to be manage d safely, both in the short and the long term, the waste transferred to ONDRAF/NIRAS must meet certain specific requirements. To that end, ONDRAF/NIRAS has developed an acceptance system. (authors)« less

  4. The Design and Implementation of a Management Information System to Facilitate the Functioning of a CBTE Program.

    ERIC Educational Resources Information Center

    Neuhauser, Charlotte

    The Vocational and Applied Arts (VAE) Management Information System (MIS) is designed to select, store, process, and transmit information needed in a competency-based teacher education (CBTE) program. The system is computerized and is composed of six subsystems which deal with admissions, class scheduling, faculty loads, instruction, field…

  5. Incorporating Total Quality Management in an Engineering Design Course. Report 5-1993.

    ERIC Educational Resources Information Center

    Wilczynski, V.; And Others

    One definition of creativity is the conviction that each and every existing idea can be improved. It is proposed that creativity in an engineering design process can be encouraged by the adoption of Total Quality Management (TQM) methods based on a commitment to continuous improvement. This paper addresses the introduction and application of TQM…

  6. The service blueprint as a tool for designing innovative pharmaceutical services.

    PubMed

    Holdford, D A; Kennedy, D T

    1999-01-01

    To describe service blueprints, discuss their need and design, and provide examples of their use in advancing pharmaceutical care. Service blueprints are pictures or maps of service processes that permit the people involved in designing, providing, managing, and using the service to better understand them and deal with them objectively. A service blueprint simultaneously depicts the service process and the roles of consumers, service providers, and supporting services. Service blueprints can be useful in pharmacy because many of the obstacles to pharmaceutical care are a result of insufficient planning by service designers and/or poor communication between those designing services and those implementing them. One consequence of this poor design and communication is that many consumers and third party payers are uninformed about pharmacist roles. Service blueprints can be used by pharmacists to promote the value of pharmaceutical care to consumers and other decision makers. They can also assist in designing better pharmaceutical services. Blueprints are designed by identifying and mapping a process from the consumer's point of view, mapping employee actions and support activities, and adding visible evidence of service at each consumer action step. Key components of service blueprints are consumer actions, "onstage" and "backstage" employee actions, and support processes. Blueprints can help pharmacy managers identify and correct problems with the service process, provide pharmacy employees an opportunity to offer feedback in the planning stages of services, and demonstrate the value of pharmaceutical services to consumers. Service blueprints can be a valuable tool for designing, implementing, and evaluating pharmacy services.

  7. Time-based management of patient processes.

    PubMed

    Kujala, Jaakko; Lillrank, Paul; Kronström, Virpi; Peltokorpi, Antti

    2006-01-01

    The purpose of this paper is to present a conceptual framework that would enable the effective application of time based competition (TBC) and work in process (WIP) concepts in the design and management of effective and efficient patient processes. This paper discusses the applicability of time-based competition and work-in-progress concepts to the design and management of healthcare service production processes. A conceptual framework is derived from the analysis of both existing research and empirical case studies. The paper finds that a patient episode is analogous to a customer order-to-delivery chain in industry. The effective application of TBC and WIP can be achieved by focusing on through put time of a patient episode by reducing the non-value adding time components and by minimizing time categories that are main cost drivers for all stakeholders involved in the patient episode. The paper shows that an application of TBC in managing patient processes can be limited if there is no consensus about optimal care episode in the medical community. In the paper it is shown that managing patient processes based on time and cost analysis enables one to allocate the optimal amount of resources, which would allow a healthcare system to minimize the total cost of specific episodes of illness. Analysing the total cost of patient episodes can provide useful information in the allocation of limited resources among multiple patient processes. This paper introduces a framework for health care managers and researchers to analyze the effect of reducing through put time to the total cost of patient episodes.

  8. Enhanced human service transportation models : joint demonstration. Phase 1, System planning and design process evaluation : baseline analysis

    DOT National Transportation Integrated Search

    2007-11-13

    This document presents the findings from the baseline phase of the evaluation of the process being used by eight sites to develop a design for a Travel Management Coordination Center (TMCC) for improved coordination of human service transportation wi...

  9. Developing 21st Century Process Skills through Project Design

    ERIC Educational Resources Information Center

    Yoo, Jeong-Ju; MacDonald, Nora M.

    2014-01-01

    The goal of this paper is to illustrate how the promotion of 21st Century process skills can be used to enhance student learning and workplace skill development: thinking, problem solving, collaboration, communication, leadership, and management. As an illustrative case, fashion merchandising and design students conducted research for a…

  10. Methodological Reflections: Designing and Understanding Computer-Supported Collaborative Learning

    ERIC Educational Resources Information Center

    Hamalainen, Raija

    2012-01-01

    Learning involves more than just a small group of participants, which makes designing and managing collaborative learning processes in higher education a challenging task. As a result, emerging concerns in current research have pointed increasingly to teacher orchestrated learning processes in naturalistic learning settings. In line with this…

  11. On-Line Real-Time Management Information Systems and Their Impact Upon User Personnel and Organizational Structure in Aviation Maintenance Activities.

    DTIC Science & Technology

    1979-12-01

    the functional management level, a real-time production con- trol system and an order processing system at the operational level. SIDMS was designed...at any one time. 26 An overview of the major software systems in operation is listed below: a. Major Software Systems: Order processing system e Order ... processing for the supply support center/AWP locker. e Order processing for the airwing squadron material controls. e Order processing for the IMA

  12. Criteria for Comparing Domain Analysis Approaches Version 01.00.00

    DTIC Science & Technology

    1991-12-01

    Down-Bottom-Up Domain Analysis Process (1990 Version) ..... 14 Figure 8. FODAs Domain Analysis Process ............................................ 16... FODA , which uses the Design Approach for Real-Time Systems (DARTS) design method (Gomaa 1984)? 1 1. hntmduction Domain analysis is still immature... Analysis Process 16 2. An Orvicw of Some Domain AnabAppro•d•a 2.4.3 ExAzs The FODA report illustrates the process by using the window management

  13. Adaptive harvest management of North American waterfowl populations - recent successes and future prospects

    USGS Publications Warehouse

    Nichols, J.D.; Runge, M.C.; Johnson, F.A.; Williams, B.K.; Schodde, Richard; Hannon, Susan; Scheiffarth, Gregor; Bairlein, Franz

    2006-01-01

    The history of North American waterfowl harvest management has been characterized by attempts to use population monitoring data to make informed harvest management decisions. Early attempts can be characterized as intuitive decision processes, and later efforts were guided increasingly by population models and associated predictions. In 1995, a formal adaptive management process was implemented, and annual decisions about duck harvest regulations in the United States are still based on this process. This formal decision process is designed to deal appropriately with the various forms of uncertainty that characterize management decisions, environmental uncertainty, structural uncertainty, partial controllability and partial observability. The key components of the process are (1) objectives, (2) potential management actions, (3) model(s) of population response to management actions, (4) credibility measures for these models, and (5) a monitoring program. The operation of this iterative process is described, and a brief history of a decade of its use is presented. Future challenges range from social and political issues such as appropriate objectives and management actions, to technical issues such as multispecies management, geographic allocation of harvest, and incorporation of actions that include habitat acquisition and management.

  14. TU-AB-BRD-04: Development of Quality Management Program

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Thomadsen, B.

    2015-06-15

    Current quality assurance and quality management guidelines provided by various professional organizations are prescriptive in nature, focusing principally on performance characteristics of planning and delivery devices. However, published analyses of events in radiation therapy show that most events are often caused by flaws in clinical processes rather than by device failures. This suggests the need for the development of a quality management program that is based on integrated approaches to process and equipment quality assurance. Industrial engineers have developed various risk assessment tools that are used to identify and eliminate potential failures from a system or a process before amore » failure impacts a customer. These tools include, but are not limited to, process mapping, failure modes and effects analysis, fault tree analysis. Task Group 100 of the American Association of Physicists in Medicine has developed these tools and used them to formulate an example risk-based quality management program for intensity-modulated radiotherapy. This is a prospective risk assessment approach that analyzes potential error pathways inherent in a clinical process and then ranks them according to relative risk, typically before implementation, followed by the design of a new process or modification of the existing process. Appropriate controls are then put in place to ensure that failures are less likely to occur and, if they do, they will more likely be detected before they propagate through the process, compromising treatment outcome and causing harm to the patient. Such a prospective approach forms the basis of the work of Task Group 100 that has recently been approved by the AAPM. This session will be devoted to a discussion of these tools and practical examples of how these tools can be used in a given radiotherapy clinic to develop a risk based quality management program. Learning Objectives: Learn how to design a process map for a radiotherapy process Learn how to perform failure modes and effects analysis analysis for a given process Learn what fault trees are all about Learn how to design a quality management program based upon the information obtained from process mapping, failure modes and effects analysis and fault tree analysis. Dunscombe: Director, TreatSafely, LLC and Center for the Assessment of Radiological Sciences; Consultant to IAEA and Varian Thomadsen: President, Center for the Assessment of Radiological Sciences Palta: Vice President of the Center for the Assessment of Radiological Sciences.« less

  15. Service Contract Compliance Management in Business Process Management

    NASA Astrophysics Data System (ADS)

    El Kharbili, Marwane; Pulvermueller, Elke

    Compliance management is a critical concern for corporations, required to respect contracts. This concern is particularly relevant in the context of business process management (BPM) as this paradigm is getting adopted more widely for-designing and building IT systems. Enforcing contractual compliance needs to be modeled at different levels of a BPM framework, which also includes the service layer. In this paper, we discuss requirements and methods for modeling contractual compliance for an SOA-supported BPM. We also show how business rule management integrated into an industry BPM tool allows modeling and processing functional and non-functional-property constraints which may be extracted from business process contracts. This work proposes a framework that responds to the requirements identified and proposes an architecture implementing it. Our approach is also illustrated by an example.

  16. Innovative applications of artificial intelligence

    NASA Astrophysics Data System (ADS)

    Schorr, Herbert; Rappaport, Alain

    Papers concerning applications of artificial intelligence are presented, covering applications in aerospace technology, banking and finance, biotechnology, emergency services, law, media planning, music, the military, operations management, personnel management, retail packaging, and manufacturing assembly and design. Specific topics include Space Shuttle telemetry monitoring, an intelligent training system for Space Shuttle flight controllers, an expert system for the diagnostics of manufacturing equipment, a logistics management system, a cooling systems design assistant, and a knowledge-based integrated circuit design critic. Additional topics include a hydraulic circuit design assistant, the use of a connector assembly specification expert system to harness detailed assembly process knowledge, a mixed initiative approach to airlift planning, naval battle management decision aids, an inventory simulation tool, a peptide synthesis expert system, and a system for planning the discharging and loading of container ships.

  17. Design and implementation of integrated solid wastes management pattern in industrial zones, case study of Shahroud, Iran.

    PubMed

    Saeid, Nazemi; Roudbari, Aliakbar; Yaghmaeian, Kamyar

    2014-01-14

    The aim of the study was to design and implementation of integrated solid wastes management pattern in Shahroud industrial zone, evaluates the results and determine possible performance problems. This cross - sectional study was carried out for 4 years in Shahroud industrial zone and the implementation process included:1- Qualitative and quantitative analysis of all solid waste generated in the city, 2- determine the current state of solid waste management in the zone and to identify programs conducted, 3- Design and implementation of integrated solid wastes management pattern including design and implementation of training programs, laws, penalties and incentives and explain and implement programs for all factories and 4- The monitoring of the implementation process and determine the results. Annually, 1,728 tons of solid wastes generated in the town including 1603 tons of industrial wastes and 125 tons of municipal wastes. By implementing this pattern, the two separated systems of collection and recycling of domestic and industrial wastes was launched in this zone. Also consistent with the goals, the amount of solid wastes generated and disposed in 2009 was 51.5 and 28.6 kg per 100 million Rials production, respectively. Results showed that implementation of pattern of separated collection, training programs, capacity building, providing technical services, completing chain of industries and strengthening the cooperation between industrial estate management and industrial units could greatly reduce the waste management problems.

  18. Scenario-based design: a method for connecting information system design with public health operations and emergency management.

    PubMed

    Reeder, Blaine; Turner, Anne M

    2011-12-01

    Responding to public health emergencies requires rapid and accurate assessment of workforce availability under adverse and changing circumstances. However, public health information systems to support resource management during both routine and emergency operations are currently lacking. We applied scenario-based design as an approach to engage public health practitioners in the creation and validation of an information design to support routine and emergency public health activities. Using semi-structured interviews we identified the information needs and activities of senior public health managers of a large municipal health department during routine and emergency operations. Interview analysis identified 25 information needs for public health operations management. The identified information needs were used in conjunction with scenario-based design to create 25 scenarios of use and a public health manager persona. Scenarios of use and persona were validated and modified based on follow-up surveys with study participants. Scenarios were used to test and gain feedback on a pilot information system. The method of scenario-based design was applied to represent the resource management needs of senior-level public health managers under routine and disaster settings. Scenario-based design can be a useful tool for engaging public health practitioners in the design process and to validate an information system design. Copyright © 2011 Elsevier Inc. All rights reserved.

  19. Achieving organizational change in pediatric pain management

    PubMed Central

    Dowden, Stephanie; McCarthy, Maria; Chalkiadis, George

    2008-01-01

    BACKGROUND: Pain in hospitalized children is often under-treated. Little information exists to guide the process of organizational change with a view to improving pain management practices. OBJECTIVES: To describe the process and results of a hospital-wide review of pain management practices designed to identify deficiencies in service provision and recommend directions for change in a pediatric hospital. DESIGN: Prospective consultation of the clinical staff of a specialist pediatric hospital, using qualitative research methodology involving semistructured individual and group interviews. Recommendations based on the interview findings were made by a hospital-appointed working party. RESULTS: A total of 454 staff (27% of all clinical staff) from a variety of professional backgrounds, representing almost every hospital unit or department, were interviewed. Procedural and persistent (chronic) pain was identified as the area needing the most improvement. Barriers to improving pain management included variability in practice, outmoded beliefs and inadequate knowledge, factors which were seen to contribute to a culture of slow or no change. Recommendations of the working party and changes achieved after the review are described. CONCLUSION: The review process identified deficiencies in the management of pain in children, and barriers to its effective management. With institutional support, the present review has guided improvement. PMID:18719714

  20. Designing a Decision Support System (DSS) for Academic Library Managers Using Preprogrammed Application Software on a Microcomputer.

    ERIC Educational Resources Information Center

    McDonald, Joseph

    1986-01-01

    Focusing on management decisions in academic libraries, this article compares management information systems (MIS) with decision support systems (DSS) and discusses the decision-making process, information needs of library managers, sources of data, reasons for choosing microcomputer, preprogrammed application software, prototyping a system, and…

  1. Presentation and Analysis of Financial Management Information. 2nd Edition.

    ERIC Educational Resources Information Center

    Kenton, Jay D.

    This book is designed to help financial and other managers of colleges and universities in identifying and responding to the needs of individuals and groups requesting management information. The book attempts to facilitate the communication process through management reports. In addition to guidance on report preparation and data analysis, the…

  2. Data management for Computer-Aided Engineering (CAE)

    NASA Technical Reports Server (NTRS)

    Bryant, W. A.; Smith, M. R.

    1984-01-01

    Analysis of data flow through the design and manufacturing processes has established specific information management requirements and identified unique problems. The application of data management technology to the engineering/manufacturing environment addresses these problems. An overview of the IPAD prototype data base management system, representing a partial solution to these problems, is presented here.

  3. Concept Engineering: An Investigation Of TIME versus Market Orientation in Product Concept Development

    DTIC Science & Technology

    1993-06-01

    Designers and Champions of Innovation. Journal of Product Innovation Management . Vol. 8,91-103 Barabba, V. P., & Zaltman, G. (1991). Hearing the Voice of...Kleinschmidt, E. K. (1986). An Investigation into the New Product Process: Steps, Deficiencies, and Impact. Journal of Product Innovation Management . Vol...Product and Process Development. Journal of Product Innovation Management . Vol. 4,81-88 Goodman, M. (1974). Study Notes in System Dynamics. Cambridge, MA

  4. Launch vehicle systems design analysis

    NASA Technical Reports Server (NTRS)

    Ryan, Robert; Verderaime, V.

    1993-01-01

    Current launch vehicle design emphasis is on low life-cycle cost. This paper applies total quality management (TQM) principles to a conventional systems design analysis process to provide low-cost, high-reliability designs. Suggested TQM techniques include Steward's systems information flow matrix method, quality leverage principle, quality through robustness and function deployment, Pareto's principle, Pugh's selection and enhancement criteria, and other design process procedures. TQM quality performance at least-cost can be realized through competent concurrent engineering teams and brilliance of their technical leadership.

  5. A system approach to aircraft optimization

    NASA Technical Reports Server (NTRS)

    Sobieszczanski-Sobieski, Jaroslaw

    1991-01-01

    Mutual couplings among the mathematical models of physical phenomena and parts of a system such as an aircraft complicate the design process because each contemplated design change may have a far reaching consequence throughout the system. Techniques are outlined for computing these influences as system design derivatives useful for both judgemental and formal optimization purposes. The techniques facilitate decomposition of the design process into smaller, more manageable tasks and they form a methodology that can easily fit into existing engineering organizations and incorporate their design tools.

  6. Management of CAD/CAM information: Key to improved manufacturing productivity

    NASA Technical Reports Server (NTRS)

    Fulton, R. E.; Brainin, J.

    1984-01-01

    A key element to improved industry productivity is effective management of CAD/CAM information. To stimulate advancements in this area, a joint NASA/Navy/Industry project designated Integrated Programs for Aerospace-Vehicle Design (IPAD) is underway with the goal of raising aerospace industry productivity through advancement of technology to integrate and manage information involved in the design and manufacturing process. The project complements traditional NASA/DOD research to develop aerospace design technology and the Air Force's Integrated Computer-Aided Manufacturing (ICAM) program to advance CAM technology. IPAD research is guided by an Industry Technical Advisory Board (ITAB) composed of over 100 repesentatives from aerospace and computer companies. The IPAD accomplishments to date in development of requirements and prototype software for various levels of company-wide CAD/CAM data management are summarized and plans for development of technology for management of distributed CAD/CAM data and information required to control future knowledge-based CAD/CAM systems are discussed.

  7. Guideline for Software Documentation Management.

    ERIC Educational Resources Information Center

    National Bureau of Standards (DOC), Washington, DC.

    Designed as a basic reference for federal personnel concerned with the development, maintenance, enhancement, control, and management of computer-based systems, this manual provides a general overview of the software development process and software documentation issues so that managers can assess their own documentation requirements. Reference is…

  8. A Collaborative Knowledge Management Process for Implementing Healthcare Enterprise Information Systems

    NASA Astrophysics Data System (ADS)

    Cheng, Po-Hsun; Chen, Sao-Jie; Lai, Jin-Shin; Lai, Feipei

    This paper illustrates a feasible health informatics domain knowledge management process which helps gather useful technology information and reduce many knowledge misunderstandings among engineers who have participated in the IBM mainframe rightsizing project at National Taiwan University (NTU) Hospital. We design an asynchronously sharing mechanism to facilitate the knowledge transfer and our health informatics domain knowledge management process can be used to publish and retrieve documents dynamically. It effectively creates an acceptable discussion environment and even lessens the traditional meeting burden among development engineers. An overall description on the current software development status is presented. Then, the knowledge management implementation of health information systems is proposed.

  9. A hybrid design methodology for structuring an Integrated Environmental Management System (IEMS) for shipping business.

    PubMed

    Celik, Metin

    2009-03-01

    The International Safety Management (ISM) Code defines a broad framework for the safe management and operation of merchant ships, maintaining high standards of safety and environmental protection. On the other hand, ISO 14001:2004 provides a generic, worldwide environmental management standard that has been utilized by several industries. Both the ISM Code and ISO 14001:2004 have the practical goal of establishing a sustainable Integrated Environmental Management System (IEMS) for shipping businesses. This paper presents a hybrid design methodology that shows how requirements from both standards can be combined into a single execution scheme. Specifically, the Analytic Hierarchy Process (AHP) and Fuzzy Axiomatic Design (FAD) are used to structure an IEMS for ship management companies. This research provides decision aid to maritime executives in order to enhance the environmental performance in the shipping industry.

  10. A Risk Management Framework to Characterize Black Swan Risks: A Case Study of Lightning Effects on Insensitive High Explosives

    NASA Astrophysics Data System (ADS)

    Sanders, Gary A.

    Effective and efficient risk management processes include the use of high fidelity modeling and simulation during the concept exploration phase as part of the technology and risk assessment activities, with testing and evaluation tasks occurring in later design development phases. However, some safety requirements and design architectures may be dominated by the low probability/high consequence "Black Swan" vulnerabilities that require very early testing to characterize and efficiently mitigate. Failure to address these unique risks has led to catastrophic systems failures including the space shuttle Challenger, Deepwater Horizon, Fukushima nuclear reactor, and Katrina dike failures. Discovering and addressing these risks later in the design and development process can be very costly or even lead to project cancellation. This paper examines the need for risk management process adoption of early hazard phenomenology testing to inform the technical risk assessment, requirements definition and conceptual design. A case study of the lightning design vulnerability of the insensitive high explosives being used in construction, mining, demolition, and defense industries will be presented to examine the impact of this vulnerability testing during the concept exploration phase of the design effort. While these insensitive high explosives are far less sensitive to accidental initiation by fire, impact, friction or even electrical stimuli, their full range of sensitivities have not been characterized and ensuring safe engineering design and operations during events such as lightning storms requires vulnerability testing during the risk assessment phase.

  11. Aspirations and common tensions: larger lessons from the third US national climate assessment

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Moser, Susanne C.; Melillo, Jerry M.; Jacobs, Katharine L.

    2015-10-21

    The Third US National Climate Assessment (NCA3) was produced by experts in response to the US Global Change Research Act of 1990. Based on lessons learned from previous domestic and international assessments, the NCA3 was designed to speak to a broad public and inform the concerns of policy- and decision-makers at different scales. The NCA3 was also intended to be the first step in an ongoing assessment process that would build the nation’s capacity to respond to climate change. This concluding paper draws larger lessons from the insights gained throughout the assessment process that are of significance to future USmore » and international assessment designers. We bring attention to process and products delivered, communication and engagement efforts, and how they contributed to the sustained assessment. Based on areas where expectations were exceeded or not fully met, we address four common tensions that all assessment designers must confront and manage: between (1) core assessment ingredients (knowledge base, institutional set-up, principled process, and the people involved), (2) national scope and subnational adaptive management information needs, (3) scope, complexity, and manageability, and (4) deliberate evaluation and ongoing learning approaches. Managing these tensions, amidst the social and political contexts in which assessments are conducted, is critical to ensure that assessments are feasible and productive, while its outcomes are perceived as credible, salient, and legitimate.« less

  12. Business process study simulation for resource management in an emergency department.

    PubMed

    Poomkothammal, Velusamy

    2006-01-01

    Alexandra Hospital conducted a business process reengineering exercise for all its main processes in order to further improve on their efficiencies with the ultimate aim to provide a higher level of services to patients. The goal of the DEM is to manage an anticipated increase in the volume of patients without much increase in resources. As a start, the Department of Emergency (DEM) medicine studied its AS-IS process and has designed and implemented the new TO-BE process. As part of this continuous improvement effort, staff from Nanyang Polytechnic (NYP) has been assigned the task of applying engineering and analytical techniques to simulate the new process. The simulations were conducted to show on process management and resource planning.

  13. The Role of Design-of-Experiments in Managing Flow in Compact Air Vehicle Inlets

    NASA Technical Reports Server (NTRS)

    Anderson, Bernhard H.; Miller, Daniel N.; Gridley, Marvin C.; Agrell, Johan

    2003-01-01

    It is the purpose of this study to demonstrate the viability and economy of Design-of-Experiments methodologies to arrive at microscale secondary flow control array designs that maintain optimal inlet performance over a wide range of the mission variables and to explore how these statistical methods provide a better understanding of the management of flow in compact air vehicle inlets. These statistical design concepts were used to investigate the robustness properties of low unit strength micro-effector arrays. Low unit strength micro-effectors are micro-vanes set at very low angles-of-incidence with very long chord lengths. They were designed to influence the near wall inlet flow over an extended streamwise distance, and their advantage lies in low total pressure loss and high effectiveness in managing engine face distortion. The term robustness is used in this paper in the same sense as it is used in the industrial problem solving community. It refers to minimizing the effects of the hard-to-control factors that influence the development of a product or process. In Robustness Engineering, the effects of the hard-to-control factors are often called noise , and the hard-to-control factors themselves are referred to as the environmental variables or sometimes as the Taguchi noise variables. Hence Robust Optimization refers to minimizing the effects of the environmental or noise variables on the development (design) of a product or process. In the management of flow in compact inlets, the environmental or noise variables can be identified with the mission variables. Therefore this paper formulates a statistical design methodology that minimizes the impact of variations in the mission variables on inlet performance and demonstrates that these statistical design concepts can lead to simpler inlet flow management systems.

  14. Enhancements to the Design Manager's Aide for Intelligent Decomposition (DeMAID)

    NASA Technical Reports Server (NTRS)

    Rogers, James L.; Barthelemy, Jean-Francois M.

    1992-01-01

    This paper discusses the addition of two new enhancements to the program Design Manager's Aide for Intelligent Decomposition (DeMAID). DeMAID is a knowledge-based tool used to aid a design manager in understanding the interactions among the tasks of a complex design problem. This is done by ordering the tasks to minimize feedback, determining the participating subsystems, and displaying them in an easily understood format. The two new enhancements include (1) rules for ordering a complex assembly process and (2) rules for determining which analysis tasks must be re-executed to compute the output of one task based on a change in input to that or another task.

  15. Enhancements to the Design Manager's Aide for Intelligent Decomposition (DeMaid)

    NASA Technical Reports Server (NTRS)

    Rogers, James L.; Barthelemy, Jean-Francois M.

    1992-01-01

    This paper discusses the addition of two new enhancements to the program Design Manager's Aide for Intelligent Decomposition (DeMAID). DeMAID is a knowledge-based tool used to aid a design manager in understanding the interactions among the tasks of a complex design problem. This is done by ordering the tasks to minimize feedback, determining the participating subsystems, and displaying them in an easily understood format. The two new enhancements include (1) rules for ordering a complex assembly process and (2) rules for determining which analysis tasks must be re-executed to compute the output of one task based on a change in input to that or another task.

  16. Managing Risk to Ensure a Successful Cassini/Huygens Saturn Orbit Insertion (SOI)

    NASA Technical Reports Server (NTRS)

    Witkowski, Mona M.; Huh, Shin M.; Burt, John B.; Webster, Julie L.

    2004-01-01

    I. Design: a) S/C designed to be largely single fault tolerant; b) Operate in flight demonstrated envelope, with margin; and c) Strict compliance with requirements & flight rules. II. Test: a) Baseline, fault & stress testing using flight system testbeds (H/W & S/W); b) In-flight checkout & demos to remove first time events. III. Failure Analysis: a) Critical event driven fault tree analysis; b) Risk mitigation & development of contingencies. IV) Residual Risks: a) Accepted pre-launch waivers to Single Point Failures; b) Unavoidable risks (e.g. natural disaster). V) Mission Assurance: a) Strict process for characterization of variances (ISAs, PFRs & Waivers; b) Full time Mission Assurance Manager reports to Program Manager: 1) Independent assessment of compliance with institutional standards; 2) Oversight & risk assessment of ISAs, PFRs & Waivers etc.; and 3) Risk Management Process facilitator.

  17. A distributed data base management system. [for Deep Space Network

    NASA Technical Reports Server (NTRS)

    Bryan, A. I.

    1975-01-01

    Major system design features of a distributed data management system for the NASA Deep Space Network (DSN) designed for continuous two-way deep space communications are described. The reasons for which the distributed data base utilizing third-generation minicomputers is selected as the optimum approach for the DSN are threefold: (1) with a distributed master data base, valid data is available in real-time to support DSN management activities at each location; (2) data base integrity is the responsibility of local management; and (3) the data acquisition/distribution and processing power of a third-generation computer enables the computer to function successfully as a data handler or as an on-line process controller. The concept of the distributed data base is discussed along with the software, data base integrity, and hardware used. The data analysis/update constraint is examined.

  18. KSC-2012-6405

    NASA Image and Video Library

    2012-09-20

    CAPE CANAVERAL, Fla. -- At NASA’s Kennedy Space Center in Florida, a groundbreaking was held to mark the start of construction on the Antenna Test Bed Array for the Ka-Band Objects Observation and Monitoring, or Ka-BOOM system. Using ceremonial shovels to mark the site, from left are Michael Le, lead design engineer and construction manager Sue Vingris, Cape Design Engineer Co. project manager Kannan Rengarajan, chief executive officer of Cape Design Engineer Co. Lutfi Mized, president of Cape Design Engineer Co. David Roelandt, construction site superintendent with Cape Design Engineer Co. Marc Seibert, NASA project manager Michael Miller, NASA project manager Peter Aragona, KSC’s Electromagnetic Lab manager Stacy Hopper, KSCs master planning supervisor Dr. Bary Geldzabler, NASA chief scientist and KSC’s Chief Technologist Karen Thompson. The construction site is near the former Vertical Processing Facility, which has been demolished. Workers will begin construction on the pile foundations for the 40-foot-diameter dish antenna arrays and their associated utilities, and prepare the site for the operations command center facility. Photo credit: NASA/Charisse Nahser

  19. KSC-2012-6404

    NASA Image and Video Library

    2012-09-20

    CAPE CANAVERAL, Fla. -- At NASA’s Kennedy Space Center in Florida, a groundbreaking was held to mark the start of construction on the Antenna Test Bed Array for the Ka-Band Objects Observation and Monitoring, or Ka-BOOM system. Holding ceremonial shovels, from left are Michael Le, lead design engineer and construction manager Sue Vingris, Cape Design Engineer Co. project manager Kannan Rengarajan, chief executive officer of Cape Design Engineer Co. Lutfi Mized, president of Cape Design Engineer Co. David Roelandt, construction site superintendent with Cape Design Engineer Co. Marc Seibert, NASA project manager Michael Miller, NASA project manager Peter Aragona, KSC’s Electromagnetic Lab manager Stacy Hopper, KSCs master planning supervisor Dr. Bary Geldzabler, NASA chief scientist and KSC’s Chief Technologist Karen Thompson. The construction site is near the former Vertical Processing Facility, which has been demolished. Workers will begin construction on the pile foundations for the 40-foot-diameter dish antenna arrays and their associated utilities, and prepare the site for the operations command center facility. Photo credit: NASA/Charisse Nahser

  20. Reengineering the Project Design Process

    NASA Technical Reports Server (NTRS)

    Casani, E.; Metzger, R.

    1994-01-01

    In response to NASA's goal of working faster, better and cheaper, JPL has developed extensive plans to minimize cost, maximize customer and employee satisfaction, and implement small- and moderate-size missions. These plans include improved management structures and processes, enhanced technical design processes, the incorporation of new technology, and the development of more economical space- and ground-system designs. The Laboratory's new Flight Projects Implementation Office has been chartered to oversee these innovations and the reengineering of JPL's project design process, including establishment of the Project Design Center and the Flight System Testbed. Reengineering at JPL implies a cultural change whereby the character of its design process will change from sequential to concurrent and from hierarchical to parallel. The Project Design Center will support missions offering high science return, design to cost, demonstrations of new technology, and rapid development. Its computer-supported environment will foster high-fidelity project life-cycle development and cost estimating.

  1. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Katipamula, Srinivas; Gowri, Krishnan; Hernandez, George

    This paper describes one such reference process that can be deployed to provide continuous automated conditioned-based maintenance management for buildings that have BIM, a building automation system (BAS) and a computerized maintenance management software (CMMS) systems. The process can be deployed using an open source transactional network platform, VOLTTRON™, designed for distributed sensing and controls and supports both energy efficiency and grid services.

  2. Quality Management and Enhancement Processes in UK Business Schools: A Review

    ERIC Educational Resources Information Center

    Hodgkinson, Myra; Kelly, Mike

    2007-01-01

    Purpose: The aim of this paper is to provide insights into the processes that can be and have been adopted by UK business schools as they attempt to meet the Quality Assurance Agency's concern with the standard of quality management and enhancement. Design/methodology/approach: A review of the literature provides interpretations of quality,…

  3. From Instructional Systems Design to Managing the Life Cycle of Knowledge in Organizations

    ERIC Educational Resources Information Center

    Salisbury, Mark

    2008-01-01

    This article describes a framework for managing the life cycle of knowledge in organizations. The framework emerges from years of work with the laboratories and facilities that are under the direction of the U.S. Department of Energy (DOE). The article begins by describing the instructional systems design (ISD) process and how it is used to…

  4. Methodology for Designing Operational Banking Risks Monitoring System

    NASA Astrophysics Data System (ADS)

    Kostjunina, T. N.

    2018-05-01

    The research looks at principles of designing an information system for monitoring operational banking risks. A proposed design methodology enables one to automate processes of collecting data on information security incidents in the banking network, serving as the basis for an integrated approach to the creation of an operational risk management system. The system can operate remotely ensuring tracking and forecasting of various operational events in the bank network. A structure of a content management system is described.

  5. Adaptation Design Tool for Climate-Smart Management of Coral Reefs and Other Natural Resources.

    PubMed

    West, Jordan M; Courtney, Catherine A; Hamilton, Anna T; Parker, Britt A; Gibbs, David A; Bradley, Patricia; Julius, Susan H

    2018-06-22

    Scientists and managers of natural resources have recognized an urgent need for improved methods and tools to enable effective adaptation of management measures in the face of climate change. This paper presents an Adaptation Design Tool that uses a structured approach to break down an otherwise overwhelming and complex process into tractable steps. The tool contains worksheets that guide users through a series of design considerations for adapting their planned management actions to be more climate-smart given changing environmental stressors. Also provided with other worksheets is a framework for brainstorming new adaptation options in response to climate threats not yet addressed in the current plan. Developed and tested in collaboration with practitioners in Hawai'i and Puerto Rico using coral reefs as a pilot ecosystem, the tool and associated reference materials consist of worksheets, instructions and lessons-learned from real-world examples. On the basis of stakeholder feedback from expert consultations during tool development, we present insights and recommendations regarding how to maximize tool efficiency, gain the greatest value from the thought process, and deal with issues of scale and uncertainty. We conclude by reflecting on how the tool advances the theory and practice of assessment and decision-making science, informs higher level strategic planning, and serves as a platform for a systematic, transparent and inclusive process to tackle the practical implications of climate change for management of natural resources.

  6. Design and implementation of a 3D ocean virtual reality and visualization engine

    NASA Astrophysics Data System (ADS)

    Chen, Ge; Li, Bo; Tian, Fenglin; Ji, Pengbo; Li, Wenqing

    2012-12-01

    In this study, a 3D virtual reality and visualization engine for rendering the ocean, named VV-Ocean, is designed for marine applications. The design goals of VV-Ocean aim at high fidelity simulation of ocean environment, visualization of massive and multidimensional marine data, and imitation of marine lives. VV-Ocean is composed of five modules, i.e. memory management module, resources management module, scene management module, rendering process management module and interaction management module. There are three core functions in VV-Ocean: reconstructing vivid virtual ocean scenes, visualizing real data dynamically in real time, imitating and simulating marine lives intuitively. Based on VV-Ocean, we establish a sea-land integration platform which can reproduce drifting and diffusion processes of oil spilling from sea bottom to surface. Environment factors such as ocean current and wind field have been considered in this simulation. On this platform oil spilling process can be abstracted as movements of abundant oil particles. The result shows that oil particles blend with water well and the platform meets the requirement for real-time and interactive rendering. VV-Ocean can be widely used in ocean applications such as demonstrating marine operations, facilitating maritime communications, developing ocean games, reducing marine hazards, forecasting the weather over oceans, serving marine tourism, and so on. Finally, further technological improvements of VV-Ocean are discussed.

  7. Semantic Service Design for Collaborative Business Processes in Internetworked Enterprises

    NASA Astrophysics Data System (ADS)

    Bianchini, Devis; Cappiello, Cinzia; de Antonellis, Valeria; Pernici, Barbara

    Modern collaborating enterprises can be seen as borderless organizations whose processes are dynamically transformed and integrated with the ones of their partners (Internetworked Enterprises, IE), thus enabling the design of collaborative business processes. The adoption of Semantic Web and service-oriented technologies for implementing collaboration in such distributed and heterogeneous environments promises significant benefits. IE can model their own processes independently by using the Software as a Service paradigm (SaaS). Each enterprise maintains a catalog of available services and these can be shared across IE and reused to build up complex collaborative processes. Moreover, each enterprise can adopt its own terminology and concepts to describe business processes and component services. This brings requirements to manage semantic heterogeneity in process descriptions which are distributed across different enterprise systems. To enable effective service-based collaboration, IEs have to standardize their process descriptions and model them through component services using the same approach and principles. For enabling collaborative business processes across IE, services should be designed following an homogeneous approach, possibly maintaining a uniform level of granularity. In the paper we propose an ontology-based semantic modeling approach apt to enrich and reconcile semantics of process descriptions to facilitate process knowledge management and to enable semantic service design (by discovery, reuse and integration of process elements/constructs). The approach brings together Semantic Web technologies, techniques in process modeling, ontology building and semantic matching in order to provide a comprehensive semantic modeling framework.

  8. 17 CFR 38.1201 - Additional sources for compliance.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... designing a futures contract, the designated contract market should conduct market research so that the contract design meets the risk management needs of prospective users and promotes price discovery of the... and opinions during the contract design process to ensure the contract's term and conditions reflect...

  9. [Designing a software for drug management in special situations at a hospital's drug administration service].

    PubMed

    Sánchez Cuervo, Marina; Muñoz García, María; Gómez de Salazar López de Silanes, María Esther; Bermejo Vicedo, Teresa

    2015-03-01

    to describe the features of a computer program for management of drugs in special situations (off-label and compassionate use) in a Department of Hospital Pharmacy (PD). To describe the methodology followed for its implementation in the Medical Services. To evaluate their use after 2 years of practice. the design was carried out by pharmacists of the PD. The stages of the process were: selection of a software development company, establishment of a working group, selection of a development platform, design of an interactive Viewer, definition of functionality and data processing, creation of databases, connection, installation and configuration, application testing and improvements development. A directed sequential strategy was used for implementation in the Medical Services. The program's utility and experience of use were evaluated after 2 years. a multidisciplinary working group was formed and developed Pk_Usos®. The program works in web environment with a common viewer for all users enabling real time checking of the request files' status and that adapts to the management of medications in special situations procedure. Pk_Usos® was introduced first in the Oncology Department, with 15 oncologists as users of the program. 343 patients had 384 treatment requests managed, of which 363 are authorized throughout two years. PK_Usos® is the first software designed for the management of drugs in special situations in the PD. It is a dynamic and efficient tool for all professionals involved in the process by optimization of times. Copyright AULA MEDICA EDICIONES 2014. Published by AULA MEDICA. All rights reserved.

  10. Process and data fragmentation-oriented enterprise network integration with collaboration modelling and collaboration agents

    NASA Astrophysics Data System (ADS)

    Li, Qing; Wang, Ze-yuan; Cao, Zhi-chao; Du, Rui-yang; Luo, Hao

    2015-08-01

    With the process of globalisation and the development of management models and information technology, enterprise cooperation and collaboration has developed from intra-enterprise integration, outsourcing and inter-enterprise integration, and supply chain management, to virtual enterprises and enterprise networks. Some midfielder enterprises begin to serve for different supply chains. Therefore, they combine related supply chains into a complex enterprise network. The main challenges for enterprise network's integration and collaboration are business process and data fragmentation beyond organisational boundaries. This paper reviews the requirements of enterprise network's integration and collaboration, as well as the development of new information technologies. Based on service-oriented architecture (SOA), collaboration modelling and collaboration agents are introduced to solve problems of collaborative management for service convergence under the condition of process and data fragmentation. A model-driven methodology is developed to design and deploy the integrating framework. An industrial experiment is designed and implemented to illustrate the usage of developed technologies in this paper.

  11. Management demands on information and communication technology in process-oriented health-care organizations: the importance of understanding managers' expectations during early phases of systems design.

    PubMed

    Andersson, Anna; Vimarlund, Vivian; Timpka, Toomas

    2002-01-01

    There are numerous challenges to overcome before information and communication technology (ICT) can achieve its full potential in process-oriented health-care organizations. One of these challenges is designing systems that meet users' needs, while reflecting a continuously changing organizational environment. Another challenge is to develop ICT that supports both the internal and the external stakeholders' demands. In this study a qualitative research strategy was used to explore the demands on ICT expressed by managers from functional and process units at a community hospitaL The results reveal a multitude of partially competing goals that can make the ICT development process confusing, poor in quality, inefficient and unnecessarily costly. Therefore, from the perspective of ICT development, the main task appears to be to coordinate the different visions and in particular clarify them, as well as to establish the impact that these visions would have on the forthcoming ICT application.

  12. Developing Ethical Competence in Healthcare Management

    ERIC Educational Resources Information Center

    Falkenström, Erica; Ohlsson, Jon; Höglund, Anna T

    2016-01-01

    Purpose: The purpose of this paper was to explore what kind of ethical competence healthcare managers need in handling conflicts of interest (COI). The aim is also to highlight essential learning processes to develop healthcare managers' ethical competence. Design/methodology/approach: A qualitative study was performed. Semi-structured interviews…

  13. Teaching Case: MiHotel--Applicant Processing System Design Case

    ERIC Educational Resources Information Center

    Miller, Robert E.; Dunn, Paul

    2018-01-01

    This teaching case describes the functionality of an applicant processing system designed for a fictitious hotel chain. The system detailed in the case includes a webform where applicants complete and submit job applications. The system also includes a desktop application used by hotel managers and Human Resources to track applications and process…

  14. The Self-Schedule System for Instructional-Learning Management in Adaptive School Learning Environments.

    ERIC Educational Resources Information Center

    Wang, Margaret C., Ed.

    The studies in this monograph are designed to examine the implementation processes of an innovative instructional program and the relationship between the implementation process and the achievement of certain program goals in school settings. The monograph is a contribution to the technical aspects of designing and implementing innovative…

  15. Rotorcraft Conceptual Design Environment

    NASA Technical Reports Server (NTRS)

    Johnson, Wayne; Sinsay, Jeffrey

    2009-01-01

    Requirements for a rotorcraft conceptual design environment are discussed, from the perspective of a government laboratory. Rotorcraft design work in a government laboratory must support research, by producing technology impact assessments and defining the context for research and development; and must support the acquisition process, including capability assessments and quantitative evaluation of designs, concepts, and alternatives. An information manager that will enable increased fidelity of analysis early in the design effort is described. This manager will be a framework to organize information that describes the aircraft, and enable movement of that information to and from analyses. Finally, a recently developed rotorcraft system analysis tool is described.

  16. Rotorcraft Conceptual Design Environment

    NASA Technical Reports Server (NTRS)

    Johnson, Wayne; Sinsay, Jeffrey D.

    2010-01-01

    Requirements for a rotorcraft conceptual design environment are discussed, from the perspective of a government laboratory. Rotorcraft design work in a government laboratory must support research, by producing technology impact assessments and defining the context for research and development; and must support the acquisition process, including capability assessments and quantitative evaluation of designs, concepts, and alternatives. An information manager that will enable increased fidelity of analysis early in the design effort is described. This manager will be a framework to organize information that describes the aircraft, and enable movement of that information to and from analyses. Finally, a recently developed rotorcraft system analysis tool is described.

  17. Evaluating hospital design from an operations management perspective.

    PubMed

    Vos, Leti; Groothuis, Siebren; van Merode, Godefridus G

    2007-12-01

    This paper describes an evaluation method for the assessment of hospital building design from the viewpoint of operations management to assure that the building design supports the efficient and effective operating of care processes now and in the future. The different steps of the method are illustrated by a case study. In the case study an experimental design is applied to assess the effect of used logistical concepts, patient mix and technologies. The study shows that the evaluation method provides a valuable tool for the assessment of both functionality and the ability to meet future developments in operational control of a building design.

  18. Supply Chain Engineering and the Use of a Supporting Knowledge Management Application

    NASA Astrophysics Data System (ADS)

    Laakmann, Frank

    The future competition in markets will happen between logistics networks and no longer between enterprises. A new approach for supporting the engineering of logistics networks is developed by this research as a part of the Collaborative Research Centre (SFB) 559: "Modeling of Large Networks in Logistics" at the University of Dortmund together with the Fraunhofer-Institute of Material Flow and Logistics founded by Deutsche Forschungsgemeinschaft (DFG). Based on a reference model for logistics processes, the process chain model, a guideline for logistics engineers is developed to manage the different types of design tasks of logistics networks. The technical background of this solution is a collaborative knowledge management application. This paper will introduce how new Internet-based technologies support supply chain design projects.

  19. How to Take HRMS Process Management to the Next Level with Workflow Business Event System

    NASA Technical Reports Server (NTRS)

    Rajeshuni, Sarala; Yagubian, Aram; Kunamaneni, Krishna

    2006-01-01

    Oracle Workflow with the Business Event System offers a complete process management solution for enterprises to manage business processes cost-effectively. Using Workflow event messaging, event subscriptions, AQ Servlet and advanced queuing technologies, this presentation will demonstrate the step-by-step design and implementation of system solutions in order to integrate two dissimilar systems and establish communication remotely. As a case study, the presentation walks you through the process of propagating organization name changes in other applications that originated from the HRMS module without changing applications code. The solution can be applied to your particular business cases for streamlining or modifying business processes across Oracle and non-Oracle applications.

  20. Lessons Learned.

    ERIC Educational Resources Information Center

    Hassell, Kim Dale

    2000-01-01

    Discusses the common mistakes in school design and construction and how to avoid them. Mistake avoidance in mastering planning, site acquisition, drawing changes, budgeting, school design process, construction management, and the architect's role are highlighted. (GR)

  1. Achieving a Risk-Informed Decision-Making Environment at NASA: The Emphasis of NASA's Risk Management Policy

    NASA Technical Reports Server (NTRS)

    Dezfuli, Homayoon

    2010-01-01

    This slide presentation reviews the evolution of risk management (RM) at NASA. The aim of the RM approach at NASA is to promote an approach that is heuristic, proactive, and coherent across all of NASA. Risk Informed Decision Making (RIDM) is a decision making process that uses a diverse set of performance measures along with other considerations within a deliberative process to inform decision making. RIDM is invoked for key decisions such as architecture and design decisions, make-buy decisions, and budget reallocation. The RIDM process and how it relates to the continuous Risk Management (CRM) process is reviewed.

  2. Articulating the Resources for Business Process Analysis and Design

    ERIC Educational Resources Information Center

    Jin, Yulong

    2012-01-01

    Effective process analysis and modeling are important phases of the business process management lifecycle. When many activities and multiple resources are involved, it is very difficult to build a correct business process specification. This dissertation provides a resource perspective of business processes. It aims at a better process analysis…

  3. Small Business Innovations (Automated Information)

    NASA Technical Reports Server (NTRS)

    1992-01-01

    Bruce G. Jackson & Associates Document Director is an automated tool that combines word processing and database management technologies to offer the flexibility and convenience of text processing with the linking capability of database management. Originally developed for NASA, it provides a means to collect and manage information associated with requirements development. The software system was used by NASA in the design of the Assured Crew Return Vehicle, as well as by other government and commercial organizations including the Southwest Research Institute.

  4. Methods and Management of the Healthy Brain Study: A Large Multisite Qualitative Research Project

    ERIC Educational Resources Information Center

    Laditka, Sarah B.; Corwin, Sara J.; Laditka, James N.; Liu, Rui; Friedman, Daniela B.; Mathews, Anna E.; Wilcox, Sara

    2009-01-01

    Purpose of the study: To describe processes used in the Healthy Brain project to manage data collection, coding, and data distribution in a large qualitative project, conducted by researchers at 9 universities in 9 states. Design and Methods: Project management protocols included: (a) managing audiotapes and surveys to ensure data confidentiality,…

  5. Analysis of a Knowledge-Management-Based Process of Transferring Project Management Skills

    ERIC Educational Resources Information Center

    Ioi, Toshihiro; Ono, Masakazu; Ishii, Kota; Kato, Kazuhiko

    2012-01-01

    Purpose: The purpose of this paper is to propose a method for the transfer of knowledge and skills in project management (PM) based on techniques in knowledge management (KM). Design/methodology/approach: The literature contains studies on methods to extract experiential knowledge in PM, but few studies exist that focus on methods to convert…

  6. Stewardship and fireshed assessment: a process for designing a landscape fuel treatment strategy.

    Treesearch

    Bernhard Bahro; Klaus H. Barber; Joseph W. Sherlock; Donald A. Yasuda

    2007-01-01

    Natural resource land managers today face a difficult challenge of developing a cohesive fuels and vegetation management strategy that addresses the widely acknowledged wildfire threat. Treatments must also be compatible with a wide variety of other land management goals, such as managing for wildlife habitat, watersheds, and forest health. In addition, funding will...

  7. Improving the Aircraft Design Process Using Web-Based Modeling and Simulation

    NASA Technical Reports Server (NTRS)

    Reed, John A.; Follen, Gregory J.; Afjeh, Abdollah A.; Follen, Gregory J. (Technical Monitor)

    2000-01-01

    Designing and developing new aircraft systems is time-consuming and expensive. Computational simulation is a promising means for reducing design cycle times, but requires a flexible software environment capable of integrating advanced multidisciplinary and multifidelity analysis methods, dynamically managing data across heterogeneous computing platforms, and distributing computationally complex tasks. Web-based simulation, with its emphasis on collaborative composition of simulation models, distributed heterogeneous execution, and dynamic multimedia documentation, has the potential to meet these requirements. This paper outlines the current aircraft design process, highlighting its problems and complexities, and presents our vision of an aircraft design process using Web-based modeling and simulation.

  8. Improving the Aircraft Design Process Using Web-based Modeling and Simulation

    NASA Technical Reports Server (NTRS)

    Reed, John A.; Follen, Gregory J.; Afjeh, Abdollah A.

    2003-01-01

    Designing and developing new aircraft systems is time-consuming and expensive. Computational simulation is a promising means for reducing design cycle times, but requires a flexible software environment capable of integrating advanced multidisciplinary and muitifidelity analysis methods, dynamically managing data across heterogeneous computing platforms, and distributing computationally complex tasks. Web-based simulation, with its emphasis on collaborative composition of simulation models, distributed heterogeneous execution, and dynamic multimedia documentation, has the potential to meet these requirements. This paper outlines the current aircraft design process, highlighting its problems and complexities, and presents our vision of an aircraft design process using Web-based modeling and simulation.

  9. Resource Analysis of Cognitive Process Flow Used to Achieve Autonomy

    DTIC Science & Technology

    2016-03-01

    to be used as a decision - making aid to guide system designers and program managers not necessarily familiar with cognitive pro- cessing, or resource...implementing end-to-end cognitive processing flows multiplies and the impact of these design decisions on efficiency and effectiveness increases [1]. The...end-to-end cognitive systems and alternative computing technologies, then system design and acquisition personnel could make systematic analyses and

  10. The Changing Metropolitan Designation Process and Rural America

    ERIC Educational Resources Information Center

    Slifkin, Rebecca T.; Randolph, Randy; Ricketts, Thomas C.

    2004-01-01

    In June 2003, the Office of Management and Budget (OMB) released new county-based designations of Core Based Statistical Areas (CBSAs), replacing Metropolitan Statistical Area designations that were last revised in 1990. In this article, the new designations are briefly described, and counties that have changed classifications are identified.…

  11. For Performance through Learning, Knowledge Management Is Critical Practice

    ERIC Educational Resources Information Center

    Gorelick, Carol; Tantawy-Monsou, Brigitte

    2005-01-01

    Purpose: This paper proposes that knowledge management is a system that integrates people, process and technology for sustainable results by increasing performance through learning. Definitions of knowledge, knowledge management and performance serve as a foundation. Design/methodology/approach: The model for the knowledge era proposed in this…

  12. Game Methods of Collective Decision Making in Management Consulting.

    ERIC Educational Resources Information Center

    Prigozhin, Arkadii Il'ich

    1991-01-01

    Explores former Soviet management consultants' increased use of social psychological game methods. Identifies such games as means of involving segments of client organizations in accomplishing shared tasks. Proposes a "practical" business game, designed to shape the process of formulating new management decisions at a radical level.…

  13. Congruent Knowledge Management Behaviors as Discriminate Sources of Competitive Advantage

    ERIC Educational Resources Information Center

    Magnier-Watanabe, Remy; Senoo, Dai

    2009-01-01

    Purpose: While knowledge management has been shown to be a strategic source of competitive advantage, processes designed to enhance the productivity of knowledge do not, however, equally contribute to the organization's capabilities. Consequently, this research aims to focus on the relationship between each mode of the knowledge management process…

  14. A Contextual Model for Identity Management (IdM) Interfaces

    ERIC Educational Resources Information Center

    Fuller, Nathaniel J.

    2014-01-01

    The usability of Identity Management (IdM) systems is highly dependent upon design that simplifies the processes of identification, authentication, and authorization. Recent findings reveal two critical problems that degrade IdM usability: (1) unfeasible techniques for managing various digital identifiers, and (2) ambiguous security interfaces.…

  15. IEC 61511 and the capital project process--a protective management system approach.

    PubMed

    Summers, Angela E

    2006-03-17

    This year, the process industry has reached an important milestone in process safety-the acceptance of an internationally recognized standard for safety instrumented systems (SIS). This standard, IEC 61511, documents good engineering practice for the assessment, design, operation, maintenance, and management of SISs. The foundation of the standard is established by several requirements in Part 1, Clauses 5-7, which cover the development of a management system aimed at ensuring that functional safety is achieved. The management system includes a quality assurance process for the entire SIS lifecycle, requiring the development of procedures, identification of resources and acquisition of tools. For maximum benefit, the deliverables and quality control checks required by the standard should be integrated into the capital project process, addressing safety, environmental, plant productivity, and asset protection. Industry has become inundated with a multitude of programs focusing on safety, quality, and cost performance. This paper introduces a protective management system, which builds upon the work process identified in IEC 61511. Typical capital project phases are integrated with the management system to yield one comprehensive program to efficiently manage process risk. Finally, the paper highlights areas where internal practices or guidelines should be developed to improve program performance and cost effectiveness.

  16. Value-driven process management: using value to improve processes.

    PubMed

    Melnyk, S A; Christensen, R T

    2000-08-01

    Every firm can be viewed as consisting of various processes. These processes affect everything that the firm does from accepting orders and designing products to scheduling production. In many firms, the management of processes often reflects considerations of efficiency (cost) rather than effectiveness (value). In this article, we introduce a well-structured process for managing processes that begins not with the process, but rather with the customer and the product and the concept of value. This process progresses through a number of steps which include issues such as defining value, generating the appropriate metrics, identifying the critical processes, mapping and assessing the performance of these processes, and identifying long- and short-term areas for action. What makes the approach presented in this article so powerful is that it explicitly links the customer to the process and that the process is evaluated in term of its ability to effectively serve the customers.

  17. Case Managers for High-Risk, High-Cost Patients as Agents and Street-Level Bureaucrats.

    PubMed

    Swanson, Jeffrey; Weissert, William G

    2017-08-01

    Case management programs often designate a nurse or social worker to take responsibility for guiding care when patients are expected to be expensive or risk a major decline. We hypothesized that though an intuitively appealing idea, careful program design and faithful implementation are essential if case management programs are to succeed. We employed two theory perspectives, principal-agent framework and street-level bureaucratic theory to describe the relationship between program designers (principals) and case managers (agents/street-level bureaucrats) to review 65 case management studies. Most programs were successful in limited program-specific process and outcome goals. But there was much less success in cost-saving or cost-effectiveness-the original and overarching goal of case management. Cost results might be improved if additional ideas of agency and street-level theory were adopted, specifically, incentives, as well as "green tape," clear rules, guidelines, and algorithms relating to resource allocation among patients.

  18. Rethinking the outpatient medication list: increasing patient activation and education while architecting for centralization and improved medication reconciliation.

    PubMed

    Pandolfe, Frank; Wright, Adam; Slack, Warner V; Safran, Charles

    2018-05-17

    Identify barriers impacting the time consuming and error fraught process of medication reconciliation. Design and implement an electronic medication management system where patient and trusted healthcare proxies can participate in establishing and maintaining an inclusive and up-to-date list of medications. A patient-facing electronic medication manager was deployed within an existing research project focused on elder care management funded by the AHRQ, InfoSAGE, allowing patients and patients' proxies the ability to build and maintain an accurate and up-to-date medication list. Free and open-source tools available from the U.S. government were used to embed the tenets of centralization, interoperability, data federation, and patient activation into the design. Using patient-centered design and free, open-source tools, we implemented a web and mobile enabled patient-facing medication manager for complex medication management. Patient and caregiver participation are essential to improve medication safety. Our medication manager is an early step towards a patient-facing medication manager that has been designed with data federation and interoperability in mind.

  19. Data Management System

    NASA Technical Reports Server (NTRS)

    1997-01-01

    CENTRA 2000 Inc., a wholly owned subsidiary of Auto-trol technology, obtained permission to use software originally developed at Johnson Space Center for the Space Shuttle and early Space Station projects. To support their enormous information-handling needs, a product data management, electronic document management and work-flow system was designed. Initially, just 33 database tables comprised the original software, which was later expanded to about 100 tables. This system, now called CENTRA 2000, is designed for quick implementation and supports the engineering process from preliminary design through release-to-production. CENTRA 2000 can also handle audit histories and provides a means to ensure new information is distributed. The product has 30 production sites worldwide.

  20. I Can Make a Scientific Research: A Course about Scientific Research Methods, in Which Learning Management System (LMS) Is Used

    ERIC Educational Resources Information Center

    Özden, Bülent

    2016-01-01

    The purpose of this study was to determine the changes in the perception of teacher candidates towards scientific research process and their self-efficacy in this process, during Scientific Research Methods course that has been conducted using "Learning Management System" based on out-of-class learning activities. Being designed as a…

  1. First-order fire effects models for land Management: Overview and issues

    Treesearch

    Elizabeth D. Reinhardt; Matthew B. Dickinson

    2010-01-01

    We give an overview of the science application process at work in supporting fire management. First-order fire effects models, such as those discussed in accompanying papers, are the building blocks of software systems designed for application to landscapes over time scales from days to centuries. Fire effects may be modeled using empirical, rule based, or process...

  2. Using a Collaborative Process to Develop Goals and Self-Management Interventions to Support Young Adults with Disabilities at Work

    ERIC Educational Resources Information Center

    Nittrouer, Christine L.; Shogren, Karrie A.; Pickens, Julie L.

    2016-01-01

    Purpose: This study examined the impact of using a collaborative process with person-centered teams and a functional assessment of problems in the workplace to design individualized goals and self-management interventions to support young adults with disabilities. These young adults had achieved employment through a customized employment process…

  3. Le Nouveau Manuel de Formation sur l'Elaboration et la Gestion des Projets. (The New Project Design and Management Workshop Training Manual).

    ERIC Educational Resources Information Center

    Peace Corps, Washington, DC. Information Collection and Exchange Div.

    A french language version of a training manual that presents guidelines for planning and conducting a project design and management (PDM) workshop to teach Peace Corps volunteers to involve local community members in the process of using participatory analysis tools and planning and implementing projects meeting local desires and needs. The first…

  4. Reinvention/reengineering of business and technical processes

    NASA Technical Reports Server (NTRS)

    Olsen, Eugene A.

    1996-01-01

    The changing marketplace as evidenced by global competition is requiring American organizations to rethink, regroup, and redesign their processes. The umbrella of total quality management (TQM) includes many quality methods, techniques, tools, and approaches. There is no right way for every situation or circumstance. Adaptability and experimentation of several tools is necessary. Process management when properly applied can lead to continuous quality improvements. But some processes simply need to be discarded and new ones developed. This reengineering often results in vertical compression and job redesign and restructuring. Work activities must be designed around processes, not processes around work activities. Reengineering and process management do not stand alone--they support each other. Senior executive leadership and empowerment of workers at all organizational levels is vital for both short-term and long-term success.

  5. Ontological Model of Business Process Management Systems

    NASA Astrophysics Data System (ADS)

    Manoilov, G.; Deliiska, B.

    2008-10-01

    The activities which constitute business process management (BPM) can be grouped into five categories: design, modeling, execution, monitoring and optimization. Dedicated software packets for business process management system (BPMS) are available on the market. But the efficiency of its exploitation depends on used ontological model in the development time and run time of the system. In the article an ontological model of BPMS in area of software industry is investigated. The model building is preceded by conceptualization of the domain and taxonomy of BPMS development. On the base of the taxonomy an simple online thesaurus is created.

  6. Integrated water management system - Description and test results. [for Space Station waste water processing

    NASA Technical Reports Server (NTRS)

    Elden, N. C.; Winkler, H. E.; Price, D. F.; Reysa, R. P.

    1983-01-01

    Water recovery subsystems are being tested at the NASA Lyndon B. Johnson Space Center for Space Station use to process waste water generated from urine and wash water collection facilities. These subsystems are being integrated into a water management system that will incorporate wash water and urine processing through the use of hyperfiltration and vapor compression distillation subsystems. Other hardware in the water management system includes a whole body shower, a clothes washing facility, a urine collection and pretreatment unit, a recovered water post-treatment system, and a water quality monitor. This paper describes the integrated test configuration, pertinent performance data, and feasibility and design compatibility conclusions of the integrated water management system.

  7. Information management advanced development. Volume 1: Summary

    NASA Technical Reports Server (NTRS)

    Gerber, C. R.

    1972-01-01

    The information management systems designed for the modular space station are discussed. Subjects presented are: (1) communications terminal breadboard configuration, (2) digital data bus breadboard configuration, (3) data processing assembly definition, and (4) computer program (software) assembly definition.

  8. Design of Knowledge Management System for Diabetic Complication Diseases

    NASA Astrophysics Data System (ADS)

    Fiarni, Cut

    2017-01-01

    This paper examines how to develop a Model for Knowledge Management System (KMS) for diabetes complication diseases. People with diabetes have a higher risk of developing a series of serious health problems. Each patient has different condition that could lead to different disease and health problem. But, with the right information, patient could have early detection so the health risk could be minimized and avoided. Hence, the objective of this research is to propose a conceptual framework that integrates social network model, Knowledge Management activities, and content based reasoning (CBR) for designing such a diabetes health and complication disease KMS. The framework indicates that the critical knowledge management activities are in the process to find similar case and the index table for algorithm to fit the framework for the social media. With this framework, KMS developers can work with healthcare provider to easily identify the suitable IT associated with the CBR process when developing a diabetes KMS.

  9. Design and implementation of integrated solid wastes management pattern in industrial zones, case study of Shahroud, Iran

    PubMed Central

    2014-01-01

    Background The aim of the study was to design and implementation of integrated solid wastes management pattern in Shahroud industrial zone, evaluates the results and determine possible performance problems. This cross - sectional study was carried out for 4 years in Shahroud industrial zone and the implementation process included:1- Qualitative and quantitative analysis of all solid waste generated in the city, 2- determine the current state of solid waste management in the zone and to identify programs conducted, 3- Design and implementation of integrated solid wastes management pattern including design and implementation of training programs, laws, penalties and incentives and explain and implement programs for all factories and 4- The monitoring of the implementation process and determine the results. Results Annually, 1,728 tons of solid wastes generated in the town including 1603 tons of industrial wastes and 125 tons of municipal wastes. By implementing this pattern, the two separated systems of collection and recycling of domestic and industrial wastes was launched in this zone. Also consistent with the goals, the amount of solid wastes generated and disposed in 2009 was 51.5 and 28.6 kg per 100 million Rials production, respectively. Conclusion Results showed that implementation of pattern of separated collection, training programs, capacity building, providing technical services, completing chain of industries and strengthening the cooperation between industrial estate management and industrial units could greatly reduce the waste management problems. PMID:24423020

  10. Optimization in the systems engineering process

    NASA Technical Reports Server (NTRS)

    Lemmerman, L. A.

    1984-01-01

    The objective is to look at optimization as it applies to the design process at a large aircraft company. The design process at Lockheed-Georgia is described. Some examples of the impact that optimization has had on that process are given, and then some areas that must be considered if optimization is to be successful and supportive in the total design process are indicated. Optimization must continue to be sold and this selling is best done by consistent good performance. For this good performance to occur, the future approaches must be clearly thought out so that the optimization methods solve the problems that actually occur during design. The visibility of the design process must be maintained as further developments are proposed. Careful attention must be given to the management of data in the optimization process, both for technical reasons and for administrative purposes. Finally, to satisfy program needs, provisions must be included to supply data to support program decisions, and to communicate with design processes outside of the optimization process. If designers fail to adequately consider all of these needs, the future acceptance of optimization will be impeded.

  11. TU-AB-BRD-01: Process Mapping

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Palta, J.

    2015-06-15

    Current quality assurance and quality management guidelines provided by various professional organizations are prescriptive in nature, focusing principally on performance characteristics of planning and delivery devices. However, published analyses of events in radiation therapy show that most events are often caused by flaws in clinical processes rather than by device failures. This suggests the need for the development of a quality management program that is based on integrated approaches to process and equipment quality assurance. Industrial engineers have developed various risk assessment tools that are used to identify and eliminate potential failures from a system or a process before amore » failure impacts a customer. These tools include, but are not limited to, process mapping, failure modes and effects analysis, fault tree analysis. Task Group 100 of the American Association of Physicists in Medicine has developed these tools and used them to formulate an example risk-based quality management program for intensity-modulated radiotherapy. This is a prospective risk assessment approach that analyzes potential error pathways inherent in a clinical process and then ranks them according to relative risk, typically before implementation, followed by the design of a new process or modification of the existing process. Appropriate controls are then put in place to ensure that failures are less likely to occur and, if they do, they will more likely be detected before they propagate through the process, compromising treatment outcome and causing harm to the patient. Such a prospective approach forms the basis of the work of Task Group 100 that has recently been approved by the AAPM. This session will be devoted to a discussion of these tools and practical examples of how these tools can be used in a given radiotherapy clinic to develop a risk based quality management program. Learning Objectives: Learn how to design a process map for a radiotherapy process Learn how to perform failure modes and effects analysis analysis for a given process Learn what fault trees are all about Learn how to design a quality management program based upon the information obtained from process mapping, failure modes and effects analysis and fault tree analysis. Dunscombe: Director, TreatSafely, LLC and Center for the Assessment of Radiological Sciences; Consultant to IAEA and Varian Thomadsen: President, Center for the Assessment of Radiological Sciences Palta: Vice President of the Center for the Assessment of Radiological Sciences.« less

  12. Process innovation in high-performance systems: From polymeric composites R&D to design and build of airplane showers

    NASA Astrophysics Data System (ADS)

    Wu, Yi-Jui

    In the aerospace industry reducing aircraft weight is key because it increases flight performance and drives down operating costs. With fierce competition in the commercial aircraft industry, companies that focused primarily on exterior aircraft performance design issues are turning more attention to the design of aircraft interior. Simultaneously, there has been an increase in the number of new amenities offered to passengers especially in first class travel and executive jets. These new amenities present novel and challenging design parameters that include integration into existing aircraft systems without sacrificing flight performance. The objective of this study was to design a re-circulating shower system for an aircraft that weighs significantly less than pre-existing shower designs. This was accomplished by integrating processes from polymeric composite materials, water filtration, and project management. Carbon/epoxy laminates exposed to hygrothermal cycling conditions were evaluated and compared to model calculations. Novel materials and a variety of fabrication processes were developed to create new types of paper for honeycomb applications. Experiments were then performed on the properties and honeycomb processability of these new papers. Standard water quality tests were performed on samples taken from the re-circulating system to see if current regulatory standards were being met. These studies were executed and integrated with tools from project management to design a better shower system for commercial aircraft applications.

  13. Concurrent Image Processing Executive (CIPE). Volume 1: Design overview

    NASA Technical Reports Server (NTRS)

    Lee, Meemong; Groom, Steven L.; Mazer, Alan S.; Williams, Winifred I.

    1990-01-01

    The design and implementation of a Concurrent Image Processing Executive (CIPE), which is intended to become the support system software for a prototype high performance science analysis workstation are described. The target machine for this software is a JPL/Caltech Mark 3fp Hypercube hosted by either a MASSCOMP 5600 or a Sun-3, Sun-4 workstation; however, the design will accommodate other concurrent machines of similar architecture, i.e., local memory, multiple-instruction-multiple-data (MIMD) machines. The CIPE system provides both a multimode user interface and an applications programmer interface, and has been designed around four loosely coupled modules: user interface, host-resident executive, hypercube-resident executive, and application functions. The loose coupling between modules allows modification of a particular module without significantly affecting the other modules in the system. In order to enhance hypercube memory utilization and to allow expansion of image processing capabilities, a specialized program management method, incremental loading, was devised. To minimize data transfer between host and hypercube, a data management method which distributes, redistributes, and tracks data set information was implemented. The data management also allows data sharing among application programs. The CIPE software architecture provides a flexible environment for scientific analysis of complex remote sensing image data, such as planetary data and imaging spectrometry, utilizing state-of-the-art concurrent computation capabilities.

  14. A Principled Approach to the Specification of System Architectures for Space Missions

    NASA Technical Reports Server (NTRS)

    McKelvin, Mark L. Jr.; Castillo, Robert; Bonanne, Kevin; Bonnici, Michael; Cox, Brian; Gibson, Corrina; Leon, Juan P.; Gomez-Mustafa, Jose; Jimenez, Alejandro; Madni, Azad

    2015-01-01

    Modern space systems are increasing in complexity and scale at an unprecedented pace. Consequently, innovative methods, processes, and tools are needed to cope with the increasing complexity of architecting these systems. A key systems challenge in practice is the ability to scale processes, methods, and tools used to architect complex space systems. Traditionally, the process for specifying space system architectures has largely relied on capturing the system architecture in informal descriptions that are often embedded within loosely coupled design documents and domain expertise. Such informal descriptions often lead to misunderstandings between design teams, ambiguous specifications, difficulty in maintaining consistency as the architecture evolves throughout the system development life cycle, and costly design iterations. Therefore, traditional methods are becoming increasingly inefficient to cope with ever-increasing system complexity. We apply the principles of component-based design and platform-based design to the development of the system architecture for a practical space system to demonstrate feasibility of our approach using SysML. Our results show that we are able to apply a systematic design method to manage system complexity, thus enabling effective data management, semantic coherence and traceability across different levels of abstraction in the design chain. Just as important, our approach enables interoperability among heterogeneous tools in a concurrent engineering model based design environment.

  15. Linking departmental priorities to knowledge management: the experiences of Santa Cruz County's Human Services Department.

    PubMed

    Lindberg, Arley

    2012-01-01

    Federal welfare reform, local service collaborations, and the evolution of statewide information systems inspired agency interest in evidence-informed practice and knowledge sharing systems. Four agency leaders, including the Director, Deputy Director, Director of Planning and Evaluation, and Staff Development Program Manager championed the development of a learning organization based on knowledge management throughout the agency. Internal department restructuring helped to strengthen the Planning and Evaluation, Staff Development, and Personnel units, which have become central to supporting knowledge sharing activities. The Four Pillars of Knowledge framework was designed to capture agency directions in relationship to future knowledge management goals. Featuring People, Practice, Technology and Budget, the framework links the agency's services, mission and goals to the process of becoming a learning organization. Built through an iterative process, the framework was created by observing existing activities in each department rather than being designed from the top down. Knowledge management can help the department to fulfill its mission despite reduced resources. Copyright © Taylor & Francis Group, LLC

  16. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Elia, Valerio; Gnoni, Maria Grazia, E-mail: mariagrazia.gnoni@unisalento.it; Tornese, Fabiana

    Highlights: • Pay-As-You-Throw (PAYT) schemes are becoming widespread in several countries. • Economic, organizational and technological issues have to be integrated in an efficient PAYT model design. • Efficiency refers to a PAYT system which support high citizen participation rates as well as economic sustainability. • Different steps and constraints have to be evaluated from collection services to type technologies. • An holistic approach is discussed to support PAYT systems diffusion. - Abstract: Pay-As-You-Throw (PAYT) strategies are becoming widely applied in solid waste management systems; the main purpose is to support a more sustainable – from economic, environmental and socialmore » points of view – management of waste flows. Adopting PAYT charging models increases the complexity level of the waste management service as new organizational issues have to be evaluated compared to flat charging models. In addition, innovative technological solutions could also be adopted to increase the overall efficiency of the service. Unit pricing, user identification and waste measurement represent the three most important processes to be defined in a PAYT system. The paper proposes a holistic framework to support an effective design and management process. The framework defines most critical processes and effective organizational and technological solutions for supporting waste managers as well as researchers.« less

  17. Advanced information processing system: Input/output network management software

    NASA Technical Reports Server (NTRS)

    Nagle, Gail; Alger, Linda; Kemp, Alexander

    1988-01-01

    The purpose of this document is to provide the software requirements and specifications for the Input/Output Network Management Services for the Advanced Information Processing System. This introduction and overview section is provided to briefly outline the overall architecture and software requirements of the AIPS system before discussing the details of the design requirements and specifications of the AIPS I/O Network Management software. A brief overview of the AIPS architecture followed by a more detailed description of the network architecture.

  18. The Iterative Design Process in Research and Development: A Work Experience Paper

    NASA Technical Reports Server (NTRS)

    Sullivan, George F. III

    2013-01-01

    The iterative design process is one of many strategies used in new product development. Top-down development strategies, like waterfall development, place a heavy emphasis on planning and simulation. The iterative process, on the other hand, is better suited to the management of small to medium scale projects. Over the past four months, I have worked with engineers at Johnson Space Center on a multitude of electronics projects. By describing the work I have done these last few months, analyzing the factors that have driven design decisions, and examining the testing and verification process, I will demonstrate that iterative design is the obvious choice for research and development projects.

  19. Structural design/margin assessment

    NASA Technical Reports Server (NTRS)

    Ryan, R. S.

    1993-01-01

    Determining structural design inputs and the structural margins following design completion is one of the major activities in space exploration. The end result is a statement of these margins as stability, safety factors on ultimate and yield stresses, fracture limits (fracture control), fatigue lifetime, reuse criteria, operational criteria and procedures, stability factors, deflections, clearance, handling criteria, etc. The process is normally called a load cycle and is time consuming, very complex, and involves much more than structures. The key to successful structural design is the proper implementation of the process. It depends on many factors: leadership and management of the process, adequate analysis and testing tools, data basing, communications, people skills, and training. This process and the various factors involved are discussed.

  20. Advanced Test Reactor Safety Basis Upgrade Lessons Learned Relative to Design Basis Verification and Safety Basis Management

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    G. L. Sharp; R. T. McCracken

    The Advanced Test Reactor (ATR) is a pressurized light-water reactor with a design thermal power of 250 MW. The principal function of the ATR is to provide a high neutron flux for testing reactor fuels and other materials. The reactor also provides other irradiation services such as radioisotope production. The ATR and its support facilities are located at the Test Reactor Area of the Idaho National Engineering and Environmental Laboratory (INEEL). An audit conducted by the Department of Energy's Office of Independent Oversight and Performance Assurance (DOE OA) raised concerns that design conditions at the ATR were not adequately analyzedmore » in the safety analysis and that legacy design basis management practices had the potential to further impact safe operation of the facility.1 The concerns identified by the audit team, and issues raised during additional reviews performed by ATR safety analysts, were evaluated through the unreviewed safety question process resulting in shutdown of the ATR for more than three months while these concerns were resolved. Past management of the ATR safety basis, relative to facility design basis management and change control, led to concerns that discrepancies in the safety basis may have developed. Although not required by DOE orders or regulations, not performing design basis verification in conjunction with development of the 10 CFR 830 Subpart B upgraded safety basis allowed these potential weaknesses to be carried forward. Configuration management and a clear definition of the existing facility design basis have a direct relation to developing and maintaining a high quality safety basis which properly identifies and mitigates all hazards and postulated accident conditions. These relations and the impact of past safety basis management practices have been reviewed in order to identify lessons learned from the safety basis upgrade process and appropriate actions to resolve possible concerns with respect to the current ATR safety basis. The need for a design basis reconstitution program for the ATR has been identified along with the use of sound configuration management principles in order to support safe and efficient facility operation.« less

  1. Final Design Report for the RH LLW Disposal Facility (RDF) Project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Austad, Stephanie Lee

    2015-09-01

    The RH LLW Disposal Facility (RDF) Project was designed by AREVA Federal Services (AFS) and the design process was managed by Battelle Energy Alliance (BEA) for the Department of Energy (DOE). The final design report for the RH LLW Disposal Facility Project is a compilation of the documents and deliverables included in the facility final design.

  2. Final Design Report for the RH LLW Disposal Facility (RDF) Project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Austad, S. L.

    2015-05-01

    The RH LLW Disposal Facility (RDF) Project was designed by AREVA Federal Services (AFS) and the design process was managed by Battelle Energy Alliance (BEA) for the Department of Energy (DOE). The final design report for the RH LLW Disposal Facility Project is a compilation of the documents and deliverables included in the facility final design.

  3. IPAD project overview

    NASA Technical Reports Server (NTRS)

    Fulton, R. E.

    1980-01-01

    To respond to national needs for improved productivity in engineering design and manufacturing, a NASA supported joint industry/government project is underway denoted Integrated Programs for Aerospace-Vehicle Design (IPAD). The objective is to improve engineering productivity through better use of computer technology. It focuses on development of technology and associated software for integrated company-wide management of engineering information. The project has been underway since 1976 under the guidance of an Industry Technical Advisory Board (ITAB) composed of representatives of major engineering and computer companies and in close collaboration with the Air Force Integrated Computer-Aided Manufacturing (ICAM) program. Results to date on the IPAD project include an in-depth documentation of a representative design process for a large engineering project, the definition and design of computer-aided design software needed to support that process, and the release of prototype software to integrate selected design functions. Ongoing work concentrates on development of prototype software to manage engineering information, and initial software is nearing release.

  4. A software development and evolution model based on decision-making

    NASA Technical Reports Server (NTRS)

    Wild, J. Christian; Dong, Jinghuan; Maly, Kurt

    1991-01-01

    Design is a complex activity whose purpose is to construct an artifact which satisfies a set of constraints and requirements. However the design process is not well understood. The software design and evolution process is the focus of interest, and a three dimensional software development space organized around a decision-making paradigm is presented. An initial instantiation of this model called 3DPM(sub p) which was partly implemented, is presented. Discussion of the use of this model in software reuse and process management is given.

  5. Strategic Financial Management for Conferences, Workshops, and Meetings. Jossey-Bass Higher and Adult Education Series and Jossey-Bass Management Series.

    ERIC Educational Resources Information Center

    Simerly, Robert G.

    This book shows how to design and implement a strategic financial management system for any organization that plans conferences, workshops, and meetings. It guides the reader through steps in the budgeting and strategic financial management process. Case studies, hints, and guidelines for avoiding the most common mistakes are given, and…

  6. An Investigation of Psychological Typology as an Intervening Variable in the Implementation of a Computer Managed Instruction System. Technical Report No. 454.

    ERIC Educational Resources Information Center

    Bozeman, William C.

    This study explores the relationships between psychological types of users as identified by the Myers-Briggs Type Indicator and factors associated with the implementation and utilization of the Wisconsin System for Instructional Management (WIS-SIM), a computer management information system designed to support management processes in…

  7. Linking wilderness research and management-volume 1. Wilderness fire restoration and management: an annotated reading list

    Treesearch

    Marion Hourdequin; Vita Wright

    2001-01-01

    The Wilderness Act of 1964 designates wilderness areas as places where natural conditions prevail and humans leave landscapes untrammeled. Managers of wilderness and similarly protected areas have a mandate to maintain wildland fire as a natural ecological process. However, because fire suppression has dominated Federal land management for most of the past century, the...

  8. Designing and evaluating a balanced scorecard for a health information management department in a Canadian urban non-teaching hospital.

    PubMed

    Nippak, Pria Md; Veracion, Julius Isidro; Muia, Maria; Ikeda-Douglas, Candace J; Isaac, Winston W

    2016-06-01

    This report is a description of a balanced scorecard design and evaluation process conducted for the health information management department at an urban non-teaching hospital in Canada. The creation of the health information management balanced scorecard involved planning, development, implementation, and evaluation of the indicators within the balanced scorecard by the health information management department and required 6 months to complete. Following the evaluation, the majority of members of the health information management department agreed that the balanced scorecard is a useful tool in reporting key performance indicators. These findings support the success of the balanced scorecard development within this setting and will help the department to better align with the hospital's corporate strategy that is linked to the provision of efficient management through the evaluation of key performance indicators. Thus, it appears that the planning and selection process used to determine the key indicators within the study can aid in the development of a balanced scorecard for a health information management department. In addition, it is important to include the health information management department staff in all stages of the balanced scorecard development, implementation, and evaluation phases. © The Author(s) 2014.

  9. TU-AB-BRD-00: Task Group 100

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    2015-06-15

    Current quality assurance and quality management guidelines provided by various professional organizations are prescriptive in nature, focusing principally on performance characteristics of planning and delivery devices. However, published analyses of events in radiation therapy show that most events are often caused by flaws in clinical processes rather than by device failures. This suggests the need for the development of a quality management program that is based on integrated approaches to process and equipment quality assurance. Industrial engineers have developed various risk assessment tools that are used to identify and eliminate potential failures from a system or a process before amore » failure impacts a customer. These tools include, but are not limited to, process mapping, failure modes and effects analysis, fault tree analysis. Task Group 100 of the American Association of Physicists in Medicine has developed these tools and used them to formulate an example risk-based quality management program for intensity-modulated radiotherapy. This is a prospective risk assessment approach that analyzes potential error pathways inherent in a clinical process and then ranks them according to relative risk, typically before implementation, followed by the design of a new process or modification of the existing process. Appropriate controls are then put in place to ensure that failures are less likely to occur and, if they do, they will more likely be detected before they propagate through the process, compromising treatment outcome and causing harm to the patient. Such a prospective approach forms the basis of the work of Task Group 100 that has recently been approved by the AAPM. This session will be devoted to a discussion of these tools and practical examples of how these tools can be used in a given radiotherapy clinic to develop a risk based quality management program. Learning Objectives: Learn how to design a process map for a radiotherapy process Learn how to perform failure modes and effects analysis analysis for a given process Learn what fault trees are all about Learn how to design a quality management program based upon the information obtained from process mapping, failure modes and effects analysis and fault tree analysis. Dunscombe: Director, TreatSafely, LLC and Center for the Assessment of Radiological Sciences; Consultant to IAEA and Varian Thomadsen: President, Center for the Assessment of Radiological Sciences Palta: Vice President of the Center for the Assessment of Radiological Sciences.« less

  10. TU-AB-BRD-03: Fault Tree Analysis

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Dunscombe, P.

    2015-06-15

    Current quality assurance and quality management guidelines provided by various professional organizations are prescriptive in nature, focusing principally on performance characteristics of planning and delivery devices. However, published analyses of events in radiation therapy show that most events are often caused by flaws in clinical processes rather than by device failures. This suggests the need for the development of a quality management program that is based on integrated approaches to process and equipment quality assurance. Industrial engineers have developed various risk assessment tools that are used to identify and eliminate potential failures from a system or a process before amore » failure impacts a customer. These tools include, but are not limited to, process mapping, failure modes and effects analysis, fault tree analysis. Task Group 100 of the American Association of Physicists in Medicine has developed these tools and used them to formulate an example risk-based quality management program for intensity-modulated radiotherapy. This is a prospective risk assessment approach that analyzes potential error pathways inherent in a clinical process and then ranks them according to relative risk, typically before implementation, followed by the design of a new process or modification of the existing process. Appropriate controls are then put in place to ensure that failures are less likely to occur and, if they do, they will more likely be detected before they propagate through the process, compromising treatment outcome and causing harm to the patient. Such a prospective approach forms the basis of the work of Task Group 100 that has recently been approved by the AAPM. This session will be devoted to a discussion of these tools and practical examples of how these tools can be used in a given radiotherapy clinic to develop a risk based quality management program. Learning Objectives: Learn how to design a process map for a radiotherapy process Learn how to perform failure modes and effects analysis analysis for a given process Learn what fault trees are all about Learn how to design a quality management program based upon the information obtained from process mapping, failure modes and effects analysis and fault tree analysis. Dunscombe: Director, TreatSafely, LLC and Center for the Assessment of Radiological Sciences; Consultant to IAEA and Varian Thomadsen: President, Center for the Assessment of Radiological Sciences Palta: Vice President of the Center for the Assessment of Radiological Sciences.« less

  11. TU-AB-BRD-02: Failure Modes and Effects Analysis

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Huq, M.

    2015-06-15

    Current quality assurance and quality management guidelines provided by various professional organizations are prescriptive in nature, focusing principally on performance characteristics of planning and delivery devices. However, published analyses of events in radiation therapy show that most events are often caused by flaws in clinical processes rather than by device failures. This suggests the need for the development of a quality management program that is based on integrated approaches to process and equipment quality assurance. Industrial engineers have developed various risk assessment tools that are used to identify and eliminate potential failures from a system or a process before amore » failure impacts a customer. These tools include, but are not limited to, process mapping, failure modes and effects analysis, fault tree analysis. Task Group 100 of the American Association of Physicists in Medicine has developed these tools and used them to formulate an example risk-based quality management program for intensity-modulated radiotherapy. This is a prospective risk assessment approach that analyzes potential error pathways inherent in a clinical process and then ranks them according to relative risk, typically before implementation, followed by the design of a new process or modification of the existing process. Appropriate controls are then put in place to ensure that failures are less likely to occur and, if they do, they will more likely be detected before they propagate through the process, compromising treatment outcome and causing harm to the patient. Such a prospective approach forms the basis of the work of Task Group 100 that has recently been approved by the AAPM. This session will be devoted to a discussion of these tools and practical examples of how these tools can be used in a given radiotherapy clinic to develop a risk based quality management program. Learning Objectives: Learn how to design a process map for a radiotherapy process Learn how to perform failure modes and effects analysis analysis for a given process Learn what fault trees are all about Learn how to design a quality management program based upon the information obtained from process mapping, failure modes and effects analysis and fault tree analysis. Dunscombe: Director, TreatSafely, LLC and Center for the Assessment of Radiological Sciences; Consultant to IAEA and Varian Thomadsen: President, Center for the Assessment of Radiological Sciences Palta: Vice President of the Center for the Assessment of Radiological Sciences.« less

  12. 17 CFR Appendix C - Demonstration of Compliance That a Contract Is Not Readily Susceptible to Manipulation

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... contract market. When designing a futures contract, the designated contract market should conduct market research so that the contract design meets the risk management needs of prospective users and promotes... users to obtain their views and opinions during the contract design process to ensure the contract's...

  13. Establishment of a Digital Knowledge Conversion Architecture Design Learning with High User Acceptance

    ERIC Educational Resources Information Center

    Wu, Yun-Wu; Weng, Apollo; Weng, Kuo-Hua

    2017-01-01

    The purpose of this study is to design a knowledge conversion and management digital learning system for architecture design learning, helping students to share, extract, use and create their design knowledge through web-based interactive activities based on socialization, internalization, combination and externalization process in addition to…

  14. 5 CFR 581.302 - Notification of obligor.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 581.302 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT CIVIL SERVICE REGULATIONS PROCESSING GARNISHMENT ORDERS FOR CHILD SUPPORT AND/OR ALIMONY Compliance With Process § 581.302 Notification of obligor... service of legal process, the agent designated to accept legal process shall send to the obligor, at his...

  15. 5 CFR 581.302 - Notification of obligor.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 581.302 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT CIVIL SERVICE REGULATIONS PROCESSING GARNISHMENT ORDERS FOR CHILD SUPPORT AND/OR ALIMONY Compliance With Process § 581.302 Notification of obligor... service of legal process, the agent designated to accept legal process shall send to the obligor, at his...

  16. 5 CFR 581.302 - Notification of obligor.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 581.302 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT CIVIL SERVICE REGULATIONS PROCESSING GARNISHMENT ORDERS FOR CHILD SUPPORT AND/OR ALIMONY Compliance With Process § 581.302 Notification of obligor... service of legal process, the agent designated to accept legal process shall send to the obligor, at his...

  17. 5 CFR 581.302 - Notification of obligor.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 581.302 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT CIVIL SERVICE REGULATIONS PROCESSING GARNISHMENT ORDERS FOR CHILD SUPPORT AND/OR ALIMONY Compliance With Process § 581.302 Notification of obligor... service of legal process, the agent designated to accept legal process shall send to the obligor, at his...

  18. 5 CFR 581.302 - Notification of obligor.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 581.302 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT CIVIL SERVICE REGULATIONS PROCESSING GARNISHMENT ORDERS FOR CHILD SUPPORT AND/OR ALIMONY Compliance With Process § 581.302 Notification of obligor... service of legal process, the agent designated to accept legal process shall send to the obligor, at his...

  19. Quality Improvement of Ground Works Process with the Use of Chosen Lean Management Tools - Case Study

    NASA Astrophysics Data System (ADS)

    Nowotarski, Piotr; Paslawski, Jerzy; Wysocki, Bartosz

    2017-12-01

    Ground works are one of the first processes connected with erecting structures. Based on ground conditions like the type of soil or level of underground water different types and solutions for foundations are designed. Foundations are the base for the buildings, and their proper design and execution is the key for the long and faultless use of the whole construction and might influence on the future costs of the eventual repairs (especially when ground water level is high, and there is no proper water insulation made). Article presents the introduction of chosen Lean Management tools for quality improvement of the process of ground works based on the analysis made on the construction site of vehicle control station located in Poznan, Poland. Processes assessment is made from different perspectives taking into account that 3 main groups of workers were directly involved in the process: blue collar-workers, site manager and site engineers. What is more comparison is made on the 3 points of view to the problems that might occur during this type of works, with details analysis on the causes of such situation? Authors presents also the change of approach of workers directly involved in the mentioned processes regarding introduction of Lean Management methodology, which illustrates the problem of scepticism for new ideas of the people used to perform works and actions in traditional way. Using Lean Management philosophy in construction is a good idea to streamline processes in company, get rid of constantly recurring problems, and in this way improve the productivity and quality of executed activities. Performed analysis showed that different groups of people have very different idea and opinion on the problems connected with executing the same process - ground works and only having full picture of the situation (especially in construction processes) management can take proper problems-preventing actions that consequently can influence on the amount of waste generated on the construction cite which positively influence on the external environment.

  20. Development of a knowledge management system for complex domains.

    PubMed

    Perott, André; Schader, Nils; Bruder, Ralph; Leonhardt, Jörg

    2012-01-01

    Deutsche Flugsicherung GmbH, the German Air Navigation Service Provider, follows a systematic approach, called HERA, for investigating incidents. The HERA analysis shows a distinctive occurrence of incidents in German air traffic control in which the visual perception of information plays a key role. The reasons can be partially traced back to workstation design, where basic ergonomic rules and principles are not sufficiently followed by the designers in some cases. In cooperation with the Institute of Ergonomics in Darmstadt the DFS investigated possible approaches that may support designers to implement ergonomic systems. None of the currently available tools were found to be able to meet the identified user requirements holistically. Therefore it was suggested to develop an enhanced software tool called Design Process Guide. The name Design Process Guide indicates that this tool exceeds the classic functions of currently available Knowledge Management Systems. It offers "design element" based access, shows processual and content related topics, and shows the implications of certain design decisions. Furthermore, it serves as documentation, detailing why a designer made to a decision under a particular set of conditions.

  1. 23 CFR 500.106 - PMS.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... process that provides information for use in implementing cost-effective pavement reconstruction, rehabilitation, and preventative maintenance programs and that results in pavements designed to accommodate... the “AASHTO Guidelines for Pavement Management Systems.” 1 1 AASHTO Guidelines for Pavement Management...

  2. 23 CFR 500.106 - PMS.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... process that provides information for use in implementing cost-effective pavement reconstruction, rehabilitation, and preventative maintenance programs and that results in pavements designed to accommodate... the “AASHTO Guidelines for Pavement Management Systems.” 1 1 AASHTO Guidelines for Pavement Management...

  3. 23 CFR 500.106 - PMS.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... process that provides information for use in implementing cost-effective pavement reconstruction, rehabilitation, and preventative maintenance programs and that results in pavements designed to accommodate... the “AASHTO Guidelines for Pavement Management Systems.” 1 1 AASHTO Guidelines for Pavement Management...

  4. 23 CFR 500.106 - PMS.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... process that provides information for use in implementing cost-effective pavement reconstruction, rehabilitation, and preventative maintenance programs and that results in pavements designed to accommodate... the “AASHTO Guidelines for Pavement Management Systems.” 1 1 AASHTO Guidelines for Pavement Management...

  5. 23 CFR 500.106 - PMS.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... process that provides information for use in implementing cost-effective pavement reconstruction, rehabilitation, and preventative maintenance programs and that results in pavements designed to accommodate... the “AASHTO Guidelines for Pavement Management Systems.” 1 1 AASHTO Guidelines for Pavement Management...

  6. Providing Data Management Support to NASA Airborne Field Studies through Streamlined Usability Design

    NASA Astrophysics Data System (ADS)

    Beach, A. L., III; Northup, E. A.; Early, A. B.; Chen, G.

    2016-12-01

    Airborne field studies are an effective way to gain a detailed understanding of atmospheric processes for scientific research on climate change and air quality relevant issues. One major function of airborne project data management is to maintain seamless data access within the science team. This allows individual instrument principal investigators (PIs) to process and validate their own data, which requires analysis of data sets from other PIs (or instruments). The project's web platform streamlines data ingest, distribution processes, and data format validation. In May 2016, the NASA Langley Research Center (LaRC) Atmospheric Science Data Center (ASDC) developed a new data management capability to help support the Korea U.S.-Air Quality (KORUS-AQ) science team. This effort is aimed at providing direct NASA Distributed Active Archive Center (DAAC) support to an airborne field study. Working closely with the science team, the ASDC developed a scalable architecture that allows investigators to easily upload and distribute their data and documentation within a secure collaborative environment. The user interface leverages modern design elements to intuitively guide the PI through each step of the data management process. In addition, the new framework creates an abstraction layer between how the data files are stored and how the data itself is organized(i.e. grouping files by PI). This approach makes it easy for PIs to simply transfer their data to one directory, while the system itself can automatically group/sort data as needed. Moreover, the platform is "server agnostic" to a certain degree, making deployment and customization more straightforward as hardware needs change. This flexible design will improve development efficiency and can be leveraged for future field campaigns. This presentation will examine the KORUS-AQ data portal as a scalable solution that applies consistent and intuitive usability design practices to support ingest and management of airborne data.

  7. A design thinking framework for healthcare management and innovation.

    PubMed

    Roberts, Jess P; Fisher, Thomas R; Trowbridge, Matthew J; Bent, Christine

    2016-03-01

    The business community has learned the value of design thinking as a way to innovate in addressing people's needs--and health systems could benefit enormously from doing the same. This paper lays out how design thinking applies to healthcare challenges and how systems might utilize this proven and accessible problem-solving process. We show how design thinking can foster new approaches to complex and persistent healthcare problems through human-centered research, collective and diverse teamwork and rapid prototyping. We introduce the core elements of design thinking for a healthcare audience and show how it can supplement current healthcare management, innovation and practice. Copyright © 2015 Elsevier Inc. All rights reserved.

  8. Quality risk management in pharmaceutical development.

    PubMed

    Charoo, Naseem Ahmad; Ali, Areeg Anwer

    2013-07-01

    The objective of ICH Q8, Q9 and Q10 documents is application of systemic and science based approach to formulation development for building quality into product. There is always some uncertainty in new product development. Good risk management practice is essential for success of new product development in decreasing this uncertainty. In quality by design paradigm, the product performance properties relevant to the patient are predefined in target product profile (TPP). Together with prior knowledge and experience, TPP helps in identification of critical quality attributes (CQA's). Initial risk assessment which identifies risks to these CQA's provides impetus for product development. Product and process are designed to gain knowledge about these risks, devise strategies to eliminate or mitigate these risks and meet objectives set in TPP. By laying more emphasis on high risk events the protection level of patient is increased. The process being scientifically driven improves the transparency and reliability of the manufacturer. The focus on risk to the patient together with flexible development approach saves invaluable resources, increases confidence on quality and reduces compliance risk. The knowledge acquired in analysing risks to CQA's permits construction of meaningful design space. Within the boundaries of the design space, variation in critical material characteristics and process parameters must be managed in order to yield a product having the desired characteristics. Specifications based on product and process understanding are established such that product will meet the specifications if tested. In this way, the product is amenable to real time release, since specifications only confirm quality but they do not serve as a means of effective process control.

  9. Systems engineering and the user: Incorporation of user requirements into the SE process

    NASA Technical Reports Server (NTRS)

    Naugle, John E.

    1993-01-01

    This paper is organized into four parts. In the Gestation Phase, I describe the process of starting a new mission and establishing its rough boundaries. Next I show how the scientific experiments are selected. Then we enter the Preliminary Design Phase, where we incorporate the scientist's instruments into the systems engineering process. Finally, I show how the Preliminary Design Review (PDR) assures NASA management and the scientists that the scientific requirements have been incorporated into the systems engineering process to everyone's satisfaction.

  10. Beliefs Regarding Classroom Management Style: Relationships to Particular Teacher Personality Characteristics.

    ERIC Educational Resources Information Center

    Martin, Nancy K.; And Others

    This study was a continuation of an in-process research effort to further refine the Inventory of Classroom Management Styles (ICMS), an instrument designed to measure teachers' perceptions of their classroom management beliefs and practices. Using preliminary data analysis based on partial data collection, the primary objective of this study was…

  11. Responding to Managers' Learning Needs in an Edge-of-Chaos Environment: Insights from Ireland

    ERIC Educational Resources Information Center

    Buckley, Finian; Monks, Kathy

    2008-01-01

    This article considers some of the challenges faced by managers operating in rapidly changing "edge of chaos" organizations and assesses whether postgraduate education can be designed to engender the abilities and skills required in such environments. In particular, can a management development process be aligned with an educational…

  12. Information Systems Technician Rating Stakeholders: Implications for Effective Performance

    DTIC Science & Technology

    2011-01-01

    DeSanctis, and Borge Obel. (2006). Organizational Design: A Step-by-Step Approach. Cambridge, UK: Cambridge University Press. Carroll, G . R., and M...manpower, personnel, and training processes for managing the information systems technician (IT) rating and the effects of these different stakeholders...Strategic Human Resource Management and Management Structure . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6 Organizational

  13. C-A1-03: Considerations in the Design and Use of an Oracle-based Virtual Data Warehouse

    PubMed Central

    Bredfeldt, Christine; McFarland, Lela

    2011-01-01

    Background/Aims The amount of clinical data available for research is growing exponentially. As it grows, increasing the efficiency of both data storage and data access becomes critical. Relational database management systems (rDBMS) such as Oracle are ideal solutions for managing longitudinal clinical data because they support large-scale data storage and highly efficient data retrieval. In addition, they can greatly simplify the management of large data warehouses, including security management and regular data refreshes. However, the HMORN Virtual Data Warehouse (VDW) was originally designed based on SAS datasets, and this design choice has a number of implications for both the design and use of an Oracle-based VDW. From a design standpoint, VDW tables are designed as flat SAS datasets, which do not take full advantage of Oracle indexing capabilities. From a data retrieval standpoint, standard VDW SAS scripts do not take advantage of SAS pass-through SQL capabilities to enable Oracle to perform the processing required to narrow datasets to the population of interest. Methods Beginning in 2009, the research department at Kaiser Permanente in the Mid-Atlantic States (KPMA) has developed an Oracle-based VDW according to the HMORN v3 specifications. In order to take advantage of the strengths of relational databases, KPMA introduced an interface layer to the VDW data, using views to provide access to standardized VDW variables. In addition, KPMA has developed SAS programs that provide access to SQL pass-through processing for first-pass data extraction into SAS VDW datasets for processing by standard VDW scripts. Results We discuss both the design and performance considerations specific to the KPMA Oracle-based VDW. We benchmarked performance of the Oracle-based VDW using both standard VDW scripts and an initial pre-processing layer to evaluate speed and accuracy of data return. Conclusions Adapting the VDW for deployment in an Oracle environment required minor changes to the underlying structure of the data. Further modifications of the underlying data structure would lead to performance enhancements. Maximally efficient data access for standard VDW scripts requires an extra step that involves restricting the data to the population of interest at the data server level prior to standard processing.

  14. Facility design consideration for continuous mix production of class 1.3 propellant

    NASA Technical Reports Server (NTRS)

    Williamson, K. L.; Schirk, P. G.

    1994-01-01

    In November of 1989, NASA awarded the Advanced Solid Rocket Motor (ASRM) contract to Lockheed Missiles and Space Company (LMSC) for production of advanced solid rocket motors using the continuous mix process. Aerojet ASRM division (AAD) was selected as the facility operator and RUST International Corporation provided the engineering, procurement, and construction management services. The continuous mix process mandates that the mix and cast facilities be 'close-coupled' along with the premix facilities, creating unique and challenging requirements for the facility designer. The classical approach to handling energetic materials-division into manageable quantities, segregation, and isolation-was not available due to these process requirements and quantities involved. This paper provides a description of the physical facilities, the continuous mix process, and discusses the monitoring and detection techniques used to mitigate hazards and prevent an incident.

  15. Water Reclamation and Reuse.

    PubMed

    Huang, Chunkai; Zeng, Ping; Yang, Sen; Shao, Yanxi; Liu, Yang

    2016-10-01

    A review of the literature published in 2015 on topics relating to water reclamation and reuse is presented. The review is divided into the following sections: (1) General: extent of reuse, research needs, guidelines and monitoring, health effects; (2) Treatment technologies: integrated process design, membrane treatment, membrane bioreactors, electrocoagulation, ion exchange and adsorption, disinfection, wetlands, managed aquifer recharge; (3) Planning and management: public acceptance and education, economics/pricing, water quality planning and management and project/case studies. Much of the water treatment research focuses on membrane treatment, integrated designs, and other innovative technologies.

  16. Reducing the distance: providing challenging and engaging online postgraduate education in pain management.

    PubMed

    Devonshire, Elizabeth; Henderson, Sarah E

    2012-05-01

    1. Health professionals need access to flexible, high-quality, advanced education in pain management. 2. There are multiple pedagogical distances to be negotiated in the delivery of effective postgraduate education. 3. A critical consideration in the design and delivery of effective online learning for postgraduate education in pain management is how to: actively engage students in the learning process; and encourage students to become lifelong learners. 4. Conceptual frameworks for encouraging student interaction online provide a useful tool in the design of postgraduate online learning activities.

  17. 78 FR 74146 - Agency Information Collection Activities; Submission for Office of Management and Budget Review...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-10

    ... for, the manufacture, preproduction design validation (including a process to assess the performance... requirements governing the design, manufacture, packing, labeling, storage, installation, and servicing of all... for Quality Assurance in Design/Development, Production, Installation, and Servicing.'' The CGMP/QS...

  18. 75 FR 63834 - Agency Information Collection Activities; Submission for Office of Management and Budget Review...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-18

    ... facilities and controls used for, the manufacture, preproduction design validation (including a process to... requirements governing the design, manufacture, packing, labeling, storage, installation, and servicing of all... Model for Quality Assurance in Design/Development, Production, Installation, and Servicing.'' The CGMP...

  19. Managing Training Materials with Structured Text Design.

    ERIC Educational Resources Information Center

    Streit, Les D.; And Others

    1986-01-01

    Describes characteristics of structured text design; benefits of its use in training; benefits for developers of training materials and steps in preparing training materials. A case study illustrating how the structured text design process solved the sales training needs of the Mercedes-Benz Truck Company is presented. (MBR)

  20. Developing a Three Processes Framework to Analyze Hydrologic Performance of Urban Stormwater Management in a Watershed Scale

    NASA Astrophysics Data System (ADS)

    Lyu, H.; Ni, G.; Sun, T.

    2016-12-01

    Urban stormwater management contributes to recover water cycle to a nearly natural situation. It is a challenge for analyzing the hydrologic performance in a watershed scale, since the measures are various of sorts and scales and work in different processes. A three processes framework is developed to simplify the urban hydrologic process on the surface and evaluate the urban stormwater management. The three processes include source utilization, transfer regulation and terminal detention, by which the stormwater is controlled in order or discharged. Methods for analyzing performance are based on the water controlled proportions by each process, which are calculated using USEPA Stormwater Management Model. A case study form Beijing is used to illustrate how the performance varies under a set of designed events of different return periods. This framework provides a method to assess urban stormwater management as a whole system considering the interaction between measures, and to examine if there is any weak process of an urban watershed to be improved. The results help to make better solutions of urban water crisis.

  1. The Design Manager's Aid for Intelligent Decomposition (DeMAID)

    NASA Technical Reports Server (NTRS)

    Rogers, James L.

    1994-01-01

    Before the design of new complex systems such as large space platforms can begin, the possible interactions among subsystems and their parts must be determined. Once this is completed, the proposed system can be decomposed to identify its hierarchical structure. The design manager's aid for intelligent decomposition (DeMAID) is a knowledge based system for ordering the sequence of modules and identifying a possible multilevel structure for design. Although DeMAID requires an investment of time to generate and refine the list of modules for input, it could save considerable money and time in the total design process, particularly in new design problems where the ordering of the modules has not been defined.

  2. The Health Action Process Approach as a Motivational Model of Dietary Self-Management for People with Multiple Sclerosis: A Path Analysis

    ERIC Educational Resources Information Center

    Chiu, Chung-Yi; Lynch, Ruth Torkelson; Chan, Fong; Rose, Lindsey

    2012-01-01

    The main objective of this study was to evaluate the health action process approach (HAPA) as a motivational model for dietary self-management for people with multiple sclerosis (MS). Quantitative descriptive research design using path analysis was used. Participants were 209 individuals with MS recruited from the National MS Society and a…

  3. Design of a QoS-controlled ATM-based communications system in chorus

    NASA Astrophysics Data System (ADS)

    Coulson, Geoff; Campbell, Andrew; Robin, Philippe; Blair, Gordon; Papathomas, Michael; Shepherd, Doug

    1995-05-01

    We describe the design of an application platform able to run distributed real-time and multimedia applications alongside conventional UNIX programs. The platform is embedded in a microkernel/PC environment and supported by an ATM-based, QoS-driven communications stack. In particular, we focus on resource-management aspects of the design and deal with CPU scheduling, network resource-management and memory-management issues. An architecture is presented that guarantees QoS levels of both communications and processing with varying degrees of commitment as specified by user-level QoS parameters. The architecture uses admission tests to determine whether or not new activities can be accepted and includes modules to translate user-level QoS parameters into representations usable by the scheduling, network, and memory-management subsystems.

  4. Using Teamcenter engineering software for a successive punching tool lifecycle management

    NASA Astrophysics Data System (ADS)

    Blaga, F.; Pele, A.-V.; Stǎnǎşel, I.; Buidoş, T.; Hule, V.

    2015-11-01

    The paper presents studies and researches results of the implementation of Teamcenter (TC) integrated management of a product lifecycle, in a virtual enterprise. The results are able to be implemented also in a real enterprise. The product was considered a successive punching and cutting tool, designed to materialize a metal sheet part. The paper defines the technical documentation flow (flow of information) in the process of constructive computer aided design of the tool. After the design phase is completed a list of parts is generated containing standard or manufactured components (BOM, Bill of Materials). The BOM may be exported to MS Excel (.xls) format and can be transferred to other departments of the company in order to supply the necessary materials and resources to achieve the final product. This paper describes the procedure to modify or change certain dimensions of sheet metal part obtained by punching. After 3D and 2D design, the digital prototype of punching tool moves to following lifecycle phase of the manufacturing process. For each operation of the technological process the corresponding phases are described in detail. Teamcenter enables to describe manufacturing company structure, underlying workstations that carry out various operations of manufacturing process. The paper revealed that the implementation of Teamcenter PDM in a company, improves efficiency of managing product information, eliminating time working with search, verification and correction of documentation, while ensuring the uniqueness and completeness of the product data.

  5. The cost management organization: the next step for materiel management.

    PubMed

    Schuweiler, R C

    1997-06-01

    With Materiel Management's transition over the last decade from simple logistics to analysis and cost management, it has gained recognition as a key part of the management team responsible for supplies, equipment, standards, and associated processes to identify, purchase, store, distribute, issue, and dispose of supplies and equipment. The materiel manager's job consists of putting the right product in the right place at the right time and in the right quantity at the best total delivered cost. In this context, Materiel Management has made powerful impacts to lower costs associated with: Distribution--costs have been lowered by actively adopting advanced supply channel management techniques such as primary suppliers, JIT, stockless programs, case cart/custom kit/procedure based delivery systems, modified stockless programs as well as margin management through cost plus, flat fee, or margins paid per activity. Cost of goods--lowered through aggregated purchasing in the forms of regional and national purchasing alliances and local capitation or other gain/risk share programs. Internal process costs--lowered by out-sourcing and/or integrating supplier processes and personnel into operations via partnership approaches. We have also reduced transactional costs through EDI transaction sets and the emerging use of the inter and intranet/electronic commerce, procurement cards, and evaluated receipt settlement processes. De-layering--We have lowered the operating costs of Materiel Management overhead by re-design/re-engineering, resulting in reduced management and greater front line authority. Quality--We have learned to identify and respond to customer and supplier needs by using quality improvement tools and ongoing measurement and monitoring techniques. Through this we have identified the waste of non-beneficial products and services. We have adopted supplier certification measurers to ensure quality is built into processes and outcomes. With so much already accomplished, it should be easy to rest on these laurels and simply operate. However, we believe that this is just a beginning. A new generation of highly educated leaders are emerging and taking advantage of the contributions of pioneers who laid the ground work. These new leaders will have advanced management, statistics, and behavioral sciences skills. They will be analysts and organizational motivators. Their goal will be to improve financial and clinical performance measured by real time process and performance data. The new leaders will have information at their fingertips thanks to significant leaps forward in data collection, automated continuous replenishment processes, and software designed for better management of clinical and cost outcomes. This article documents significant Materiel management accomplishments and conceptualizes cost management processes. The cost management organization is the logical evolution in our efforts for better outcomes in healthcare Materiel management.

  6. GMDPtoolbox: A Matlab library for designing spatial management policies. Application to the long-term collective management of an airborne disease

    PubMed Central

    Aubertot, Jean-Noël; Peyrard, Nathalie; Sabbadin, Régis

    2017-01-01

    Designing management policies in ecology and agroecology is complex. Several components must be managed together while they strongly interact spatially. Decision choices must be made under uncertainty on the results of the actions and on the system dynamics. Furthermore, the objectives pursued when managing ecological systems or agroecosystems are usually long term objectives, such as biodiversity conservation or sustainable crop production. The framework of Graph-Based Markov Decision Processes (GMDP) is well adapted to the qualitative modeling of such problems of sequential decision under uncertainty. Spatial interactions are easily modeled and integrated control policies (combining several action levers) can be designed through optimization. The provided policies are adaptive, meaning that management actions are decided at each time step (for instance yearly) and the chosen actions depend on the current system state. This framework has already been successfully applied to forest management and invasive species management. However, up to now, no “easy-to-use” implementation of this framework was available. We present GMDPtoolbox, a Matlab toolbox which can be used both for the design of new management policies and for comparing policies by simulation. We provide an illustration of the use of the toolbox on a realistic crop disease management problem: the design of long term management policy of blackleg of canola using an optimal combination of three possible cultural levers. This example shows how GMDPtoolbox can be used as a tool to support expert thinking. PMID:28982151

  7. GMDPtoolbox: A Matlab library for designing spatial management policies. Application to the long-term collective management of an airborne disease.

    PubMed

    Cros, Marie-Josée; Aubertot, Jean-Noël; Peyrard, Nathalie; Sabbadin, Régis

    2017-01-01

    Designing management policies in ecology and agroecology is complex. Several components must be managed together while they strongly interact spatially. Decision choices must be made under uncertainty on the results of the actions and on the system dynamics. Furthermore, the objectives pursued when managing ecological systems or agroecosystems are usually long term objectives, such as biodiversity conservation or sustainable crop production. The framework of Graph-Based Markov Decision Processes (GMDP) is well adapted to the qualitative modeling of such problems of sequential decision under uncertainty. Spatial interactions are easily modeled and integrated control policies (combining several action levers) can be designed through optimization. The provided policies are adaptive, meaning that management actions are decided at each time step (for instance yearly) and the chosen actions depend on the current system state. This framework has already been successfully applied to forest management and invasive species management. However, up to now, no "easy-to-use" implementation of this framework was available. We present GMDPtoolbox, a Matlab toolbox which can be used both for the design of new management policies and for comparing policies by simulation. We provide an illustration of the use of the toolbox on a realistic crop disease management problem: the design of long term management policy of blackleg of canola using an optimal combination of three possible cultural levers. This example shows how GMDPtoolbox can be used as a tool to support expert thinking.

  8. Collaborative engineering and design management for the Hobby-Eberly Telescope tracker upgrade

    NASA Astrophysics Data System (ADS)

    Mollison, Nicholas T.; Hayes, Richard J.; Good, John M.; Booth, John A.; Savage, Richard D.; Jackson, John R.; Rafal, Marc D.; Beno, Joseph H.

    2010-07-01

    The engineering and design of systems as complex as the Hobby-Eberly Telescope's* new tracker require that multiple tasks be executed in parallel and overlapping efforts. When the design of individual subsystems is distributed among multiple organizations, teams, and individuals, challenges can arise with respect to managing design productivity and coordinating successful collaborative exchanges. This paper focuses on design management issues and current practices for the tracker design portion of the Hobby-Eberly Telescope Wide Field Upgrade project. The scope of the tracker upgrade requires engineering contributions and input from numerous fields including optics, instrumentation, electromechanics, software controls engineering, and site-operations. Successful system-level integration of tracker subsystems and interfaces is critical to the telescope's ultimate performance in astronomical observation. Software and process controls for design information and workflow management have been implemented to assist the collaborative transfer of tracker design data. The tracker system architecture and selection of subsystem interfaces has also proven to be a determining factor in design task formulation and team communication needs. Interface controls and requirements change controls will be discussed, and critical team interactions are recounted (a group-participation Failure Modes and Effects Analysis [FMEA] is one of special interest). This paper will be of interest to engineers, designers, and managers engaging in multi-disciplinary and parallel engineering projects that require coordination among multiple individuals, teams, and organizations.

  9. Obtaining mathematical models for assessing efficiency of dust collectors using integrated system of analysis and data management STATISTICA Design of Experiments

    NASA Astrophysics Data System (ADS)

    Azarov, A. V.; Zhukova, N. S.; Kozlovtseva, E. Yu; Dobrinsky, D. R.

    2018-05-01

    The article considers obtaining mathematical models to assess the efficiency of the dust collectors using an integrated system of analysis and data management STATISTICA Design of Experiments. The procedure for obtaining mathematical models and data processing is considered by the example of laboratory studies on a mounted installation containing a dust collector in counter-swirling flows (CSF) using gypsum dust of various fractions. Planning of experimental studies has been carried out in order to reduce the number of experiments and reduce the cost of experimental research. A second-order non-position plan (Box-Bencken plan) was used, which reduced the number of trials from 81 to 27. The order of statistical data research of Box-Benken plan using standard tools of integrated system for analysis and data management STATISTICA Design of Experiments is considered. Results of statistical data processing with significance estimation of coefficients and adequacy of mathematical models are presented.

  10. A Conceptual Model and Database to Integrate Data and Project Management

    NASA Astrophysics Data System (ADS)

    Guarinello, M. L.; Edsall, R.; Helbling, J.; Evaldt, E.; Glenn, N. F.; Delparte, D.; Sheneman, L.; Schumaker, R.

    2015-12-01

    Data management is critically foundational to doing effective science in our data-intensive research era and done well can enhance collaboration, increase the value of research data, and support requirements by funding agencies to make scientific data and other research products available through publically accessible online repositories. However, there are few examples (but see the Long-term Ecological Research Network Data Portal) of these data being provided in such a manner that allows exploration within the context of the research process - what specific research questions do these data seek to answer? what data were used to answer these questions? what data would have been helpful to answer these questions but were not available? We propose an agile conceptual model and database design, as well as example results, that integrate data management with project management not only to maximize the value of research data products but to enhance collaboration during the project and the process of project management itself. In our project, which we call 'Data Map,' we used agile principles by adopting a user-focused approach and by designing our database to be simple, responsive, and expandable. We initially designed Data Map for the Idaho EPSCoR project "Managing Idaho's Landscapes for Ecosystem Services (MILES)" (see https://www.idahoecosystems.org//) and will present example results for this work. We consulted with our primary users- project managers, data managers, and researchers to design the Data Map. Results will be useful to project managers and to funding agencies reviewing progress because they will readily provide answers to the questions "For which research projects/questions are data available and/or being generated by MILES researchers?" and "Which research projects/questions are associated with each of the 3 primary questions from the MILES proposal?" To be responsive to the needs of the project, we chose to streamline our design for the prototype database and build it in a way that is modular and can be changed or expanded to meet user needs. Our hope is that others, especially those managing large collaborative research grants, will be able to use our project model and database design to enhance the value of their project and data management both during and following the active research period.

  11. Adaptive management for ecosystem services.

    PubMed

    Birgé, Hannah E; Allen, Craig R; Garmestani, Ahjond S; Pope, Kevin L

    2016-12-01

    Management of natural resources for the production of ecosystem services, which are vital for human well-being, is necessary even when there is uncertainty regarding system response to management action. This uncertainty is the result of incomplete controllability, complex internal feedbacks, and non-linearity that often interferes with desired management outcomes, and insufficient understanding of nature and people. Adaptive management was developed to reduce such uncertainty. We present a framework for the application of adaptive management for ecosystem services that explicitly accounts for cross-scale tradeoffs in the production of ecosystem services. Our framework focuses on identifying key spatiotemporal scales (plot, patch, ecosystem, landscape, and region) that encompass dominant structures and processes in the system, and includes within- and cross-scale dynamics, ecosystem service tradeoffs, and management controllability within and across scales. Resilience theory recognizes that a limited set of ecological processes in a given system regulate ecosystem services, yet our understanding of these processes is poorly understood. If management actions erode or remove these processes, the system may shift into an alternative state unlikely to support the production of desired services. Adaptive management provides a process to assess the underlying within and cross-scale tradeoffs associated with production of ecosystem services while proceeding with management designed to meet the demands of a growing human population. Copyright © 2016 Elsevier Ltd. All rights reserved.

  12. Multimedia environmental management

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Soesilo, J.A.; Wiley, W.D.

    1999-09-01

    This book explores and supports the argument that effective environmental management must be based on a multimedia approach, which focuses simultaneously on air, water, and waste and enables managers to assess the resulting financial, operation, and management benefits. The multimedia approach, which can be used to design an effective compliance program, includes proper waste and material handling management, systematic monitoring, and record keeping requirements. This approach integrates a wide array of environmental requirements and decision processes, which the authors examine in sixteen chapters, organized into four parts: the role of environmental management; environmental aspects of business operation, environmental processes; andmore » environmental management trends. Within these parts, the authors highlight the development of modern environmental management and provide an overview of federal laws pertinent to multimedia environmental management. They examine such issues as chemical storage and transportation, tank system operations and requirements, waste determination, spill response procedures, and employee training. Environmental processes addressed in the book include the management of solid and hazardous waste, wastewater treatment systems, stormwater management, air emission control, and site remediation. The authors also briefly discuss significant initiatives in US environmental management and look toward corporate sustainable development.« less

  13. Identification of Tools and Techniques to Enhance Interdisciplinary Collaboration During Design and Construction Projects.

    PubMed

    Keys, Yolanda; Silverman, Susan R; Evans, Jennie

    2017-10-01

    The purpose of this study was to collect the perceptions of design professionals and clinicians regarding design process success strategies and elements of interprofessional engagement and communication during healthcare design and construction projects. Additional objectives were to gather best practices to maximize clinician engagement and provide tools and techniques to improve interdisciplinary collaboration for future projects. Strategies are needed to enhance the design and construction process and create interactions that benefit not only the project but the individuals working to see its completion. Meaningful interprofessional collaboration is essential to any healthcare design project and making sure the various players communicate is a critical element. This was a qualitative study conducted via an online survey. Respondents included architects, construction managers, interior designers, and healthcare personnel who had recently been involved in a building renovation or new construction project for a healthcare facility. Responses to open-ended questions were analyzed for themes, and descriptive statistics were used to provide insight into participant demographics. Information on the impressions, perceptions, and opportunities related to clinician involvement in design projects was collected from nurses, architects, interior designers, and construction managers. Qualitative analysis revealed themes of clinician input, organizational dynamics, and a variety of communication strategies to be the most frequently mentioned elements of successful interprofessional collaboration. This study validates the need to include clinician input in the design process, to consider the importance of organizational dynamics on design team functioning, and to incorporate effective communication strategies during design and construction projects.

  14. Worklist handling in workflow-enabled radiological application systems

    NASA Astrophysics Data System (ADS)

    Wendler, Thomas; Meetz, Kirsten; Schmidt, Joachim; von Berg, Jens

    2000-05-01

    For the next generation integrated information systems for health care applications, more emphasis has to be put on systems which, by design, support the reduction of cost, the increase inefficiency and the improvement of the quality of services. A substantial contribution to this will be the modeling. optimization, automation and enactment of processes in health care institutions. One of the perceived key success factors for the system integration of processes will be the application of workflow management, with workflow management systems as key technology components. In this paper we address workflow management in radiology. We focus on an important aspect of workflow management, the generation and handling of worklists, which provide workflow participants automatically with work items that reflect tasks to be performed. The display of worklists and the functions associated with work items are the visible part for the end-users of an information system using a workflow management approach. Appropriate worklist design and implementation will influence user friendliness of a system and will largely influence work efficiency. Technically, in current imaging department information system environments (modality-PACS-RIS installations), a data-driven approach has been taken: Worklist -- if present at all -- are generated from filtered views on application data bases. In a future workflow-based approach, worklists will be generated by autonomous workflow services based on explicit process models and organizational models. This process-oriented approach will provide us with an integral view of entire health care processes or sub- processes. The paper describes the basic mechanisms of this approach and summarizes its benefits.

  15. Design of an instrument to measure the quality of care in Physical Therapy.

    PubMed

    Cavalheiro, Leny Vieira; Eid, Raquel Afonso Caserta; Talerman, Claudia; Prado, Cristiane do; Gobbi, Fátima Cristina Martorano; Andreoli, Paola Bruno de Araujo

    2015-01-01

    To design an instrument composed of domains that would demonstrate physical therapy activities and generate a consistent index to represent the quality of care in physical therapy. The methodology Lean Six Sigma was used to design the tool. The discussion involved seven different management groups staff. By means of brainstorming and Cause & Effect Matrix, we set up the process map. Five requirements composed the quality of care index in physical therapy, after application of the tool called Cause & Effect Matrix. The following requirements were assessed: physical therapist performance, care outcome indicator, adherence to physical therapy protocols, measure whether the prognosis and treatment outcome was achieved and Infrastructure. The proposed design allowed evaluating several items related to physical therapy service, enabling customization, reproducibility and benchmarking with other organizations. For management, this index provides the opportunity to identify areas for improvement and the strengths of the team and process of physical therapy care.

  16. Mastering the Maestro: The Effective Maestro Asks Writers, Photographers, and Designers to Trade Places with Readers as They Plan.

    ERIC Educational Resources Information Center

    Cripe, Dennis

    1998-01-01

    Considers two very different fictional high school newspaper editorships to see how the "maestro" process works. Notes that the process is a management technique similar to brainstorming but in which one person keeps the planning meeting focused. Suggests that the effective maestro asks writers, photographers, and designers to trade places with…

  17. Design of a simulation environment for laboratory management by robot organizations

    NASA Technical Reports Server (NTRS)

    Zeigler, Bernard P.; Cellier, Francois E.; Rozenblit, Jerzy W.

    1988-01-01

    This paper describes the basic concepts needed for a simulation environment capable of supporting the design of robot organizations for managing chemical, or similar, laboratories on the planned U.S. Space Station. The environment should facilitate a thorough study of the problems to be encountered in assigning the responsibility of managing a non-life-critical, but mission valuable, process to an organized group of robots. In the first phase of the work, we seek to employ the simulation environment to develop robot cognitive systems and strategies for effective multi-robot management of chemical experiments. Later phases will explore human-robot interaction and development of robot autonomy.

  18. WaferOptics® mass volume production and reliability

    NASA Astrophysics Data System (ADS)

    Wolterink, E.; Demeyer, K.

    2010-05-01

    The Anteryon WaferOptics® Technology platform contains imaging optics designs, materials, metrologies and combined with wafer level based Semicon & MEMS production methods. WaferOptics® first required complete new system engineering. This system closes the loop between application requirement specifications, Anteryon product specification, Monte Carlo Analysis, process windows, process controls and supply reject criteria. Regarding the Anteryon product Integrated Lens Stack (ILS), new design rules, test methods and control systems were assessed, implemented, validated and customer released for mass production. This includes novel reflowable materials, mastering process, replication, bonding, dicing, assembly, metrology, reliability programs and quality assurance systems. Many of Design of Experiments were performed to assess correlations between optical performance parameters and machine settings of all process steps. Lens metrologies such as FFL, BFL, and MTF were adapted for wafer level production and wafer mapping was introduced for yield management. Test methods for screening and validating suitable optical materials were designed. Critical failure modes such as delamination and popcorning were assessed and modeled with FEM. Anteryon successfully managed to integrate the different technologies starting from single prototypes to high yield mass volume production These parallel efforts resulted in a steep yield increase from 30% to over 90% in a 8 months period.

  19. Designing cost effective water demand management programs in Australia.

    PubMed

    White, S B; Fane, S A

    2002-01-01

    This paper describes recent experience with integrated resource planning (IRP) and the application of least cost planning (LCP) for the evaluation of demand management strategies in urban water. Two Australian case studies, Sydney and Northern New South Wales (NSW) are used in illustration. LCP can determine the most cost effective means of providing water services or alternatively the cheapest forms of water conservation. LCP contrasts to a traditional approach of evaluation which looks only at means of increasing supply. Detailed investigation of water usage, known as end-use analysis, is required for LCP. End-use analysis allows both rigorous demand forecasting, and the development and evaluation of conservation strategies. Strategies include education campaigns, increasing water use efficiency and promoting wastewater reuse or rainwater tanks. The optimal mix of conservation strategies and conventional capacity expansion is identified based on levelised unit cost. IRP uses LCP in the iterative process, evaluating and assessing options, investing in selected options, measuring the results, and then re-evaluating options. Key to this process is the design of cost effective demand management programs. IRP however includes a range of parameters beyond least economic cost in the planning process and program designs, including uncertainty, benefit partitioning and implementation considerations.

  20. Managerial process improvement: a lean approach to eliminating medication delivery.

    PubMed

    Hussain, Aftab; Stewart, LaShonda M; Rivers, Patrick A; Munchus, George

    2015-01-01

    Statistical evidence shows that medication errors are a major cause of injuries that concerns all health care oganizations. Despite all the efforts to improve the quality of care, the lack of understanding and inability of management to design a robust system that will strategically target those factors is a major cause of distress. The paper aims to discuss these issues. Achieving optimum organizational performance requires two key variables; work process factors and human performance factors. The approach is that healthcare administrators must take in account both variables in designing a strategy to reduce medication errors. However, strategies that will combat such phenomena require that managers and administrators understand the key factors that are causing medication delivery errors. The authors recommend that healthcare organizations implement the Toyota Production System (TPS) combined with human performance improvement (HPI) methodologies to eliminate medication delivery errors in hospitals. Despite all the efforts to improve the quality of care, there continues to be a lack of understanding and the ability of management to design a robust system that will strategically target those factors associated with medication errors. This paper proposes a solution to an ambiguous workflow process using the TPS combined with the HPI system.

  1. FRAMEWORK DESIGN FOR BMP PLACEMENT IN URBAN WATERSHEDS

    EPA Science Inventory

    BMP processes into one model is highly desirable To assist stormwater management professionals in planning for best management practices (BMPs) implementation, the U.S. Environmental Protection Agency (USEPA) is developing a decision support system for placement of BMPs at strat...

  2. Manufacturing Technology.

    ERIC Educational Resources Information Center

    Barnes, James L.

    This curriculum guide is designed to assist junior high school industrial arts teachers in planning new courses and revising existing courses in manufacturing technology. Addressed in the individual units of the guide are the following topics: introduction to manufacturing, materials processing, personnel management, production management,…

  3. Bidding-based autonomous process planning and scheduling

    NASA Astrophysics Data System (ADS)

    Gu, Peihua; Balasubramanian, Sivaram; Norrie, Douglas H.

    1995-08-01

    Improving productivity through computer integrated manufacturing systems (CIMS) and concurrent engineering requires that the islands of automation in an enterprise be completely integrated. The first step in this direction is to integrate design, process planning, and scheduling. This can be achieved through a bidding-based process planning approach. The product is represented in a STEP model with detailed design and administrative information including design specifications, batch size, and due dates. Upon arrival at the manufacturing facility, the product registered in the shop floor manager which is essentially a coordinating agent. The shop floor manager broadcasts the product's requirements to the machines. The shop contains autonomous machines that have knowledge about their functionality, capabilities, tooling, and schedule. Each machine has its own process planner and responds to the product's request in a different way that is consistent with its capabilities and capacities. When more than one machine offers certain process(es) for the same requirements, they enter into negotiation. Based on processing time, due date, and cost, one of the machines wins the contract. The successful machine updates its schedule and advises the product to request raw material for processing. The concept was implemented using a multi-agent system with the task decomposition and planning achieved through contract nets. The examples are included to illustrate the approach.

  4. Program Manager: The Journal of the Defense Systems Management College. Volume 15, Number 1, January-February 1986.

    DTIC Science & Technology

    1986-02-01

    Mc0Ivaine Wilbur D. Jones, Jr. analysis to design and to integrated This is the second publication of a e to n s logistics support within the SE process...Contributing Editor David D. Acker Editorial Assistants Esther M. Farria Dorothy L. Reago Darlene IV. Miller Design Director Greg Caruth Illustrators SSG Ron...Speeds Camouflage Design - 53 and should be addressed to the Editor-in-Chief. In- quiries concerning proposed articles may be made byILS - 55 phone at

  5. A risk-based approach to management of leachables utilizing statistical analysis of extractables.

    PubMed

    Stults, Cheryl L M; Mikl, Jaromir; Whelehan, Oliver; Morrical, Bradley; Duffield, William; Nagao, Lee M

    2015-04-01

    To incorporate quality by design concepts into the management of leachables, an emphasis is often put on understanding the extractable profile for the materials of construction for manufacturing disposables, container-closure, or delivery systems. Component manufacturing processes may also impact the extractable profile. An approach was developed to (1) identify critical components that may be sources of leachables, (2) enable an understanding of manufacturing process factors that affect extractable profiles, (3) determine if quantitative models can be developed that predict the effect of those key factors, and (4) evaluate the practical impact of the key factors on the product. A risk evaluation for an inhalation product identified injection molding as a key process. Designed experiments were performed to evaluate the impact of molding process parameters on the extractable profile from an ABS inhaler component. Statistical analysis of the resulting GC chromatographic profiles identified processing factors that were correlated with peak levels in the extractable profiles. The combination of statistically significant molding process parameters was different for different types of extractable compounds. ANOVA models were used to obtain optimal process settings and predict extractable levels for a selected number of compounds. The proposed paradigm may be applied to evaluate the impact of material composition and processing parameters on extractable profiles and utilized to manage product leachables early in the development process and throughout the product lifecycle.

  6. Using Analytics to Transform a Problem-Based Case Library: An Educational Design Research Approach

    ERIC Educational Resources Information Center

    Schmidt, Matthew; Tawfik, Andrew A.

    2018-01-01

    This article describes the iterative design, development, and evaluation of a case-based learning environment focusing on an ill-structured sales management problem. We discuss our processes and situate them within the broader framework of educational design research. The learning environment evolved over the course of three design phases. A…

  7. Design Knowledge Management System (DKMS) Beta Test Report

    DTIC Science & Technology

    1992-11-01

    design process. These problems, which include knowledge representation, constraint propagation, model design, and information integration, are...effective delivery of life-cycle engineering knowledge assistance and information to the design/engineering activities. It does not matter whether these...platfomi. 4. Reuse - existing data, information , and knowledge can be reused. 5. Remote Execution -- automatically handles remote execution without

  8. Process Improvement Through Tool Integration in Aero-Mechanical Design

    NASA Technical Reports Server (NTRS)

    Briggs, Clark

    2010-01-01

    Emerging capabilities in commercial design tools promise to significantly improve the multi-disciplinary and inter-disciplinary design and analysis coverage for aerospace mechanical engineers. This paper explores the analysis process for two example problems of a wing and flap mechanical drive system and an aircraft landing gear door panel. The examples begin with the design solid models and include various analysis disciplines such as structural stress and aerodynamic loads. Analytical methods include CFD, multi-body dynamics with flexible bodies and structural analysis. Elements of analysis data management, data visualization and collaboration are also included.

  9. Translating supportability requirements into design reality

    NASA Astrophysics Data System (ADS)

    Buche, J.; Cohen, I.

    1986-10-01

    This paper explores some of the principal issues in the integration of supportability into the design process. Roles of the contractor's design, supportability and management specialists and their government counterparts are discussed as they relate to logistics influence in design. Methods and processes by which weapon system logistics and readiness requirements are established, assessed, allocated to system elements and translated into specific design features are described. Tradeoff consideration, an approach to effective tradeoff criteria, and the progress of supportability issues through the program phases are identified with particular emphasis on the necessity for developing and maintaining an effective audit trail.

  10. Optimization process in helicopter design

    NASA Technical Reports Server (NTRS)

    Logan, A. H.; Banerjee, D.

    1984-01-01

    In optimizing a helicopter configuration, Hughes Helicopters uses a program called Computer Aided Sizing of Helicopters (CASH), written and updated over the past ten years, and used as an important part of the preliminary design process of the AH-64. First, measures of effectiveness must be supplied to define the mission characteristics of the helicopter to be designed. Then CASH allows the designer to rapidly and automatically develop the basic size of the helicopter (or other rotorcraft) for the given mission. This enables the designer and management to assess the various tradeoffs and to quickly determine the optimum configuration.

  11. Event Processing and Variable Part of Sample Period Determining in Combined Systems Using GA

    NASA Astrophysics Data System (ADS)

    Strémy, Maximilián; Závacký, Pavol; Jedlička, Martin

    2011-01-01

    This article deals with combined dynamic systems and usage of modern techniques in dealing with these systems, focusing particularly on sampling period design, cyclic processing tasks and related processing algorithms in the combined event management systems using genetic algorithms.

  12. 5 CFR 582.302 - Notification of employee-obligor.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... Section 582.302 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT CIVIL SERVICE REGULATIONS COMMERCIAL GARNISHMENT OF FEDERAL EMPLOYEES' PAY Compliance With Legal Process § 582.302 Notification of... service of legal process, the agent designated to accept legal process shall send to the employee-obligor...

  13. 5 CFR 582.302 - Notification of employee-obligor.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... Section 582.302 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT CIVIL SERVICE REGULATIONS COMMERCIAL GARNISHMENT OF FEDERAL EMPLOYEES' PAY Compliance With Legal Process § 582.302 Notification of... service of legal process, the agent designated to accept legal process shall send to the employee-obligor...

  14. 5 CFR 582.302 - Notification of employee-obligor.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Section 582.302 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT CIVIL SERVICE REGULATIONS COMMERCIAL GARNISHMENT OF FEDERAL EMPLOYEES' PAY Compliance With Legal Process § 582.302 Notification of... service of legal process, the agent designated to accept legal process shall send to the employee-obligor...

  15. 5 CFR 582.302 - Notification of employee-obligor.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... Section 582.302 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT CIVIL SERVICE REGULATIONS COMMERCIAL GARNISHMENT OF FEDERAL EMPLOYEES' PAY Compliance With Legal Process § 582.302 Notification of... service of legal process, the agent designated to accept legal process shall send to the employee-obligor...

  16. 5 CFR 582.302 - Notification of employee-obligor.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... Section 582.302 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT CIVIL SERVICE REGULATIONS COMMERCIAL GARNISHMENT OF FEDERAL EMPLOYEES' PAY Compliance With Legal Process § 582.302 Notification of... service of legal process, the agent designated to accept legal process shall send to the employee-obligor...

  17. Redefining and expanding quality assurance.

    PubMed

    Robins, J L

    1992-12-01

    To meet the current standards of excellence necessary for blood establishments, we have learned from industry that a movement toward organization-wide quality assurance/total quality management must be made. Everyone in the organization must accept responsibility for participating in providing the highest quality products and services. Quality must be built into processes and design systems to support these quality processes. Quality assurance has been redefined to include a quality planning function described as the most effective way of designing quality into processes. A formalized quality planning process must be part of quality assurance. Continuous quality improvement has been identified as the strategy every blood establishment must support while striving for error-free processing as the long-term objective. The auditing process has been realigned to support and facilitate this same objective. Implementing organization-wide quality assurance/total quality management is one proven plan for guaranteeing the quality of the 20 million products that are transfused into 4 million patients each year and for moving toward the new order.

  18. BIM: Enabling Sustainability and Asset Management through Knowledge Management

    PubMed Central

    2013-01-01

    Building Information Modeling (BIM) is the use of virtual building information models to develop building design solutions and design documentation and to analyse construction processes. Recent advances in IT have enabled advanced knowledge management, which in turn facilitates sustainability and improves asset management in the civil construction industry. There are several important qualifiers and some disadvantages of the current suite of technologies. This paper outlines the benefits, enablers, and barriers associated with BIM and makes suggestions about how these issues may be addressed. The paper highlights the advantages of BIM, particularly the increased utility and speed, enhanced fault finding in all construction phases, and enhanced collaborations and visualisation of data. The paper additionally identifies a range of issues concerning the implementation of BIM as follows: IP, liability, risks, and contracts and the authenticity of users. Implementing BIM requires investment in new technology, skills training, and development of new ways of collaboration and Trade Practices concerns. However, when these challenges are overcome, BIM as a new information technology promises a new level of collaborative engineering knowledge management, designed to facilitate sustainability and asset management issues in design, construction, asset management practices, and eventually decommissioning for the civil engineering industry. PMID:24324392

  19. BIM: enabling sustainability and asset management through knowledge management.

    PubMed

    Kivits, Robbert Anton; Furneaux, Craig

    2013-11-10

    Building Information Modeling (BIM) is the use of virtual building information models to develop building design solutions and design documentation and to analyse construction processes. Recent advances in IT have enabled advanced knowledge management, which in turn facilitates sustainability and improves asset management in the civil construction industry. There are several important qualifiers and some disadvantages of the current suite of technologies. This paper outlines the benefits, enablers, and barriers associated with BIM and makes suggestions about how these issues may be addressed. The paper highlights the advantages of BIM, particularly the increased utility and speed, enhanced fault finding in all construction phases, and enhanced collaborations and visualisation of data. The paper additionally identifies a range of issues concerning the implementation of BIM as follows: IP, liability, risks, and contracts and the authenticity of users. Implementing BIM requires investment in new technology, skills training, and development of new ways of collaboration and Trade Practices concerns. However, when these challenges are overcome, BIM as a new information technology promises a new level of collaborative engineering knowledge management, designed to facilitate sustainability and asset management issues in design, construction, asset management practices, and eventually decommissioning for the civil engineering industry.

  20. Comparing Dutch Case management care models for people with dementia and their caregivers: The design of the COMPAS study

    PubMed Central

    2012-01-01

    Background Dementia care in the Netherlands is shifting from fragmented, ad hoc care to more coordinated and personalised care. Case management contributes to this shift. The linkage model and a combination of intensive case management and joint agency care models were selected based on their emerging prominence in the Netherlands. It is unclear if these different forms of case management are more effective than usual care in improving or preserving the functioning and well-being at the patient and caregiver level and at the societal cost. The objective of this article is to describe the design of a study comparing these two case management care models against usual care. Clinical and cost outcomes are investigated while care processes and the facilitators and barriers for implementation of these models are considered. Design Mixed methods include a prospective, observational, controlled, cohort study among persons with dementia and their primary informal caregiver in regions of the Netherlands with and without case management including a qualitative process evaluation. Inclusion criteria for the cohort study are: community-dwelling individuals with a dementia diagnosis who are not terminally-ill or anticipate admission to a nursing home within 6 months and with an informal caregiver who speaks fluent Dutch. Person with dementia-informal caregiver dyads are followed for two years. The primary outcome measure is the Neuropsychiatric Inventory for the people with dementia and the General Health Questionnaire for their caregivers. Secondary outcomes include: quality of life and needs assessment in both persons with dementia and caregivers, activity of daily living, competence of care, and number of crises. Costs are measured from a societal perspective using cost diaries. Process indicators measure the quality of care from the participant’s perspective. The qualitative study uses purposive sampling methods to ensure a wide variation of respondents. Semi-structured interviews with stakeholders based on the theoretical model of adaptive implementation are planned. Discussion This study provides relevant insights into care processes, description of two case management models along with clinical and economic data from persons with dementia and caregivers to clarify important differences in two case management care models compared to usual care. PMID:22640695

  1. Chapter 14: Effects of fire suppression and postfire management activities on plant invasions

    Treesearch

    Matthew L. Brooks

    2008-01-01

    This chapter explains how various fire suppression and postfire management activities can increase or decrease the potential for plant invasions following fire. A conceptual model is used to summarize the basic processes associated with plant invasions and show how specific fire management activities can be designed to minimize the potential for invasion. The...

  2. Forest processes from stands to landscapes: exploring model forecast uncertainties using cross-scale model comparison

    Treesearch

    Michael J. Papaik; Andrew Fall; Brian Sturtevant; Daniel Kneeshaw; Christian Messier; Marie-Josee Fortin; Neal Simon

    2010-01-01

    Forest management practices conducted primarily at the stand scale result in simplified forests with regeneration problems and low structural and biological diversity. Landscape models have been used to help design management strategies to address these problems. However, there remains a great deal of uncertainty that the actual management practices result in the...

  3. Paper and Process: How Youth Programs Manage Program Intake, Individual Service Strategy Development, and Case Files.

    ERIC Educational Resources Information Center

    Callahan, Jim; McLaughlin, Brenda

    This guide presents information and materials to help youth programs manage program intake, design an individual service strategy (ISS) as mandated in the Workforce Investment Act, and manage case files. The materials are based on information obtained from staff working in seven successful youth workforce investment programs in Maryland,…

  4. Top-Down Management: An Effective Tool in Higher Education?

    ERIC Educational Resources Information Center

    Tsai, Yau; Beverton, Sue

    2007-01-01

    Purpose: The purpose of this paper is to explore the strengths and weaknesses of top-down management in a university that has embraced globalisation with a strong market-led ethos and to suggest the ways in which adjustments might be made to top-down management processes. Design/methodology/approach: The paper examines the strengths and weaknesses…

  5. HR Manager Leadership in Quality Improvement in a College Environment

    ERIC Educational Resources Information Center

    Sharabi, Moshe

    2010-01-01

    Purpose: The purpose of this paper is to present the influence of the human resource (HR) manager on the quality of service in an academic college, and the human resource management (HRM) outcomes of the process. Design/methodology/approach: The paper relates to a customer satisfaction survey. More than 120 questionnaires were completed by the…

  6. The Perceptions and Experiences of School Management Teams and Teachers of the Management of Physical Resources in Public Schools

    ERIC Educational Resources Information Center

    Mestry, Raj; Bodalina, Kishan

    2015-01-01

    The effective management of physical resources significantly impacts on the quality of teaching and learning in schools. The procurement, utilization and maintenance of physical resources through organized structures, well-designed policies and rigid processes are critical for quality education. According to the South African Schools Act 1996, a…

  7. Management Information System for Vocational Education. MISVE Technical Description. Research and Development Series No. 127E.

    ERIC Educational Resources Information Center

    Hulse, Ira; And Others

    One of six documents describing the Management Information System for Vocational Education (MISVE), this document is intended for MISVE managers and electronic data processing (EDP) operations staff who would be responsible for the implementation and maintenance of the MISVE on the computer. (MISVE was designed to provide users with an advanced…

  8. Washington Community Colleges Factbook. Addendum B: A Description of the Community College Management Information System.

    ERIC Educational Resources Information Center

    Meier, Terre; Bundy, Larry

    The Management Information System (MIS) of the Washington State system of community colleges was designed to be responsive to legislative and district requests for information and to enhance the State Board's capabilities to manage the community college system and integrate its budgeting and planning processes. The MIS consists of seven…

  9. School District Information Study. Planning for the Management of Information through Technology. A Planning and Staff Development Project.

    ERIC Educational Resources Information Center

    New York State Education Dept., Albany. Div. of Elementary and Secondary Education Planning.

    Designed to provide assistance to school district personnel who seek to develop a plan for information management and related applications of technology, this guide presents the School District Information Study (SDIS) model for the review of management policies, procedures, and activities related to information processing done by school district…

  10. The Relationship between Gender and Aspirations to Senior Management

    ERIC Educational Resources Information Center

    Litzky, Barrie; Greenhaus, Jeffrey

    2007-01-01

    Purpose: The purpose of this paper is to examine the relationship of gender, work factors, and non-work factors with aspirations to positions in senior management. A process model of senior management aspirations was developed and tested. Design/methodology/approach: Data were collected via an online survey that resulted in a sample of 368 working…

  11. Models and Procedures for Improving the Planning, Management, and Evaluation of Cooperative Education Programs. Final Report. Volume I.

    ERIC Educational Resources Information Center

    Blaschke, Charles L.; Steiger, JoAnn

    This report of a project to design a set of training guidelines for planning, managing, and evaluating cooperative education programs describes briefly the procedures used in developing the guidelines and model; discusses the various components of the planning, management, and evaluation process; and presents guidelines and criteria for designing…

  12. Process Management and Exception Handling in Multiprocessor Operating Systems Using Object-Oriented Design Techniques. Revised Sep. 1988

    NASA Technical Reports Server (NTRS)

    Russo, Vincent; Johnston, Gary; Campbell, Roy

    1988-01-01

    The programming of the interrupt handling mechanisms, process switching primitives, scheduling mechanism, and synchronization primitives of an operating system for a multiprocessor require both efficient code in order to support the needs of high- performance or real-time applications and careful organization to facilitate maintenance. Although many advantages have been claimed for object-oriented class hierarchical languages and their corresponding design methodologies, the application of these techniques to the design of the primitives within an operating system has not been widely demonstrated. To investigate the role of class hierarchical design in systems programming, the authors have constructed the Choices multiprocessor operating system architecture the C++ programming language. During the implementation, it was found that many operating system design concerns can be represented advantageously using a class hierarchical approach, including: the separation of mechanism and policy; the organization of an operating system into layers, each of which represents an abstract machine; and the notions of process and exception management. In this paper, we discuss an implementation of the low-level primitives of this system and outline the strategy by which we developed our solution.

  13. Special Report: Part One. New Tools for Professionals.

    ERIC Educational Resources Information Center

    Liskin, Miriam; And Others

    1984-01-01

    This collection of articles includes an examination of word-processing software; project management software; new expert systems that turn microcomputers into logical, well-informed consultants; simulated negotiation software; telephone management systems; and the physical design of an efficient microcomputer work space. (MBR)

  14. 45 CFR 205.36 - State plan requirements.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ..., of an automated statewide management information system designed effectively and efficiently, to assist management in the administration of an approved AFDC State plan. The submission process to amend... aid or services is changed. (c) To electronically refer and exchange information with programs under...

  15. On-Line Investment Analysis and Portfolio Management: Using Learning Outcome Statements To Design Projects.

    ERIC Educational Resources Information Center

    Pettijohn, James B.; Ragan, Gay A.; Ragan, Kent P.

    2003-01-01

    Describes an Internet-based project to familiarize students with online investment analysis and stock portfolio management. Outlines a process for writing learning outcomes that address three levels of cognition: knowledge/comprehension, application/analysis, and synthesis/evaluation. (SK)

  16. Maximizing Value for Training with ISO 9000.

    ERIC Educational Resources Information Center

    Russo, C. W. Russ; Russo, Tracy Callaway

    1996-01-01

    The International Organization for Standardization (ISO) has created quality assurance guidelines that help technology trainers and educators manage and organize training programs. This article briefly outlines program design principles, emphasizing needs analysis and outcome evaluation, performance documentation, and process management. ISO 9000…

  17. NHDOT : process for municipally-managed state bridge aid program projects

    DOT National Transportation Integrated Search

    2007-09-12

    The document sets for the requirements for a municipality which to manage the design and construction of a bridge rehabilitation or replacement project and receive Bridge Aid under the applicable provisions of RSA 234. Bridge Aid provided to a Munici...

  18. Nurse manager cognitive decision-making amidst stress and work complexity.

    PubMed

    Shirey, Maria R; Ebright, Patricia R; McDaniel, Anna M

    2013-01-01

      The present study provides insight into nurse manager cognitive decision-making amidst stress and work complexity.   Little is known about nurse manager decision-making amidst stress and work complexity. Because nurse manager decisions have the potential to impact patient care quality and safety, understanding their decision-making processes is useful for designing supportive interventions.   This qualitative descriptive study interviewed 21 nurse managers from three hospitals to answer the research question: What decision-making processes do nurse managers utilize to address stressful situations in their nurse manager role? Face-to-face interviews incorporating components of the Critical Decision Method illuminated expert-novice practice differences. Content analysis identified one major theme and three sub-themes.   The present study produced a cognitive model that guides nurse manager decision-making related to stressful situations. Experience in the role, organizational context and situation factors influenced nurse manager cognitive decision-making processes.   Study findings suggest that chronic exposure to stress and work complexity negatively affects nurse manager health and their decision-making processes potentially threatening individual, patient and organizational outcomes.   Cognitive decision-making varies based on nurse manager experience and these differences have coaching and mentoring implications. This present study contributes a current understanding of nurse manager decision-making amidst stress and work complexity. © 2012 Blackwell Publishing Ltd.

  19. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Szoka de Valladares, M.R.; Mack, S.

    The DOE Hydrogen Program needs to develop criteria as part of a systematic evaluation process for proposal identification, evaluation and selection. The H Scan component of this process provides a framework in which a project proposer can fully describe their candidate technology system and its components. The H Scan complements traditional methods of capturing cost and technical information. It consists of a special set of survey forms designed to elicit information so expert reviewers can assess the proposal relative to DOE specified selection criteria. The Analytic Hierarchy Process (AHP) component of the decision process assembles the management defined evaluation andmore » selection criteria into a coherent multi-level decision construct by which projects can be evaluated in pair-wise comparisons. The AHP model will reflect management`s objectives and it will assist in the ranking of individual projects based on the extent to which each contributes to management`s objectives. This paper contains a detailed description of the products and activities associated with the planning and evaluation process: The objectives or criteria; the H Scan; and The Analytic Hierarchy Process (AHP).« less

  20. A Context-Driven Model for the Flat Roofs Construction Process through Sensing Systems, Internet-of-Things and Last Planner System

    PubMed Central

    Andújar-Montoya, María Dolores

    2017-01-01

    The main causes of building defects are errors in the design and the construction phases. These causes related to construction are mainly due to the general lack of control of construction work and represent approximately 75% of the anomalies. In particular, one of the main causes of such anomalies, which end in building defects, is the lack of control over the physical variables of the work environment during the execution of tasks. Therefore, the high percentage of defects detected in buildings that have the root cause in the construction phase could be avoidable with a more accurate and efficient control of the process. The present work proposes a novel integration model based on information and communications technologies for the automation of both construction work and its management at the execution phase, specifically focused on the flat roof construction process. Roofs represent the second area where more defects are claimed. The proposed model is based on a Web system, supported by a service oriented architecture, for the integral management of tasks through the Last Planner System methodology, but incorporating the management of task restrictions from the physical environment variables by designing specific sensing systems. Likewise, all workers are integrated into the management process by Internet-of-Things solutions that guide them throughout the execution process in a non-intrusive and transparent way. PMID:28737693

  1. A Context-Driven Model for the Flat Roofs Construction Process through Sensing Systems, Internet-of-Things and Last Planner System.

    PubMed

    Andújar-Montoya, María Dolores; Marcos-Jorquera, Diego; García-Botella, Francisco Manuel; Gilart-Iglesias, Virgilio

    2017-07-22

    The main causes of building defects are errors in the design and the construction phases. These causes related to construction are mainly due to the general lack of control of construction work and represent approximately 75% of the anomalies. In particular, one of the main causes of such anomalies, which end in building defects, is the lack of control over the physical variables of the work environment during the execution of tasks. Therefore, the high percentage of defects detected in buildings that have the root cause in the construction phase could be avoidable with a more accurate and efficient control of the process. The present work proposes a novel integration model based on information and communications technologies for the automation of both construction work and its management at the execution phase, specifically focused on the flat roof construction process. Roofs represent the second area where more defects are claimed. The proposed model is based on a Web system, supported by a service oriented architecture, for the integral management of tasks through the Last Planner System methodology, but incorporating the management of task restrictions from the physical environment variables by designing specific sensing systems. Likewise, all workers are integrated into the management process by Internet-of-Things solutions that guide them throughout the execution process in a non-intrusive and transparent way.

  2. Online thesis guidance management information system

    NASA Astrophysics Data System (ADS)

    Nasution, T. H.; Pratama, F.; Tanjung, K.; Siregar, I.; Amalia, A.

    2018-03-01

    The development of internet technology in education is still not maximized, especially in the process of thesis guidance between students and lecturers. Difficulties met the lecturers to help students during thesis guidance is the limited communication time and the compatibility of schedule between students and lecturer. To solve this problem, we designed an online thesis guidance management information system that helps students and lecturers to do thesis tutoring process anytime, anywhere. The system consists of a web-based admin app for usage management and an android-based app for students and lecturers.

  3. System approach to distributed sensor management

    NASA Astrophysics Data System (ADS)

    Mayott, Gregory; Miller, Gordon; Harrell, John; Hepp, Jared; Self, Mid

    2010-04-01

    Since 2003, the US Army's RDECOM CERDEC Night Vision Electronic Sensor Directorate (NVESD) has been developing a distributed Sensor Management System (SMS) that utilizes a framework which demonstrates application layer, net-centric sensor management. The core principles of the design support distributed and dynamic discovery of sensing devices and processes through a multi-layered implementation. This results in a sensor management layer that acts as a System with defined interfaces for which the characteristics, parameters, and behaviors can be described. Within the framework, the definition of a protocol is required to establish the rules for how distributed sensors should operate. The protocol defines the behaviors, capabilities, and message structures needed to operate within the functional design boundaries. The protocol definition addresses the requirements for a device (sensors or processes) to dynamically join or leave a sensor network, dynamically describe device control and data capabilities, and allow dynamic addressing of publish and subscribe functionality. The message structure is a multi-tiered definition that identifies standard, extended, and payload representations that are specifically designed to accommodate the need for standard representations of common functions, while supporting the need for feature-based functions that are typically vendor specific. The dynamic qualities of the protocol enable a User GUI application the flexibility of mapping widget-level controls to each device based on reported capabilities in real-time. The SMS approach is designed to accommodate scalability and flexibility within a defined architecture. The distributed sensor management framework and its application to a tactical sensor network will be described in this paper.

  4. Intelligent Resource Management for Local Area Networks: Approach and Evolution

    NASA Technical Reports Server (NTRS)

    Meike, Roger

    1988-01-01

    The Data Management System network is a complex and important part of manned space platforms. Its efficient operation is vital to crew, subsystems and experiments. AI is being considered to aid in the initial design of the network and to augment the management of its operation. The Intelligent Resource Management for Local Area Networks (IRMA-LAN) project is concerned with the application of AI techniques to network configuration and management. A network simulation was constructed employing real time process scheduling for realistic loads, and utilizing the IEEE 802.4 token passing scheme. This simulation is an integral part of the construction of the IRMA-LAN system. From it, a causal model is being constructed for use in prediction and deep reasoning about the system configuration. An AI network design advisor is being added to help in the design of an efficient network. The AI portion of the system is planned to evolve into a dynamic network management aid. The approach, the integrated simulation, project evolution, and some initial results are described.

  5. Managing design excellence tools during the development of new orthopaedic implants.

    PubMed

    Défossez, Henri J P; Serhan, Hassan

    2013-11-01

    Design excellence (DEX) tools have been widely used for years in some industries for their potential to facilitate new product development. The medical sector, targeted by cost pressures, has therefore started adopting them. Numerous tools are available; however only appropriate deployment during the new product development stages can optimize the overall process. The primary study objectives were to describe generic tools and illustrate their implementation and management during the development of new orthopaedic implants, and compile a reference package. Secondary objectives were to present the DEX tool investment costs and savings, since the method can require significant resources for which companies must carefully plan. The publicly available DEX method "Define Measure Analyze Design Verify Validate" was adopted and implemented during the development of a new spinal implant. Several tools proved most successful at developing the correct product, addressing clinical needs, and increasing market penetration potential, while reducing design iterations and manufacturing validations. Cost analysis and Pugh Matrix coupled with multi generation planning enabled developing a strong rationale to activate the project, set the vision and goals. improved risk management and product map established a robust technical verification-validation program. Design of experiments and process quantification facilitated design for manufacturing of critical features, as early as the concept phase. Biomechanical testing with analysis of variance provided a validation model with a recognized statistical performance baseline. Within those tools, only certain ones required minimum resources (i.e., business case, multi generational plan, project value proposition, Pugh Matrix, critical To quality process validation techniques), while others required significant investments (i.e., voice of customer, product usage map, improved risk management, design of experiments, biomechanical testing techniques). All used techniques provided savings exceeding investment costs. Some other tools were considered and found less relevant. A matrix summarized the investment costs and generated estimated savings. Globally, all companies can benefit from using DEX by smartly selecting and estimating those tools with best return on investment at the start of the project. For this, a good understanding of the available company resources, background and development strategy are needed. In conclusion, it was possible to illustrate that appropriate management of design excellence tools can greatly facilitate the development of new orthopaedic implant systems.

  6. Program Helps Decompose Complex Design Systems

    NASA Technical Reports Server (NTRS)

    Rogers, James L., Jr.; Hall, Laura E.

    1995-01-01

    DeMAID (Design Manager's Aid for Intelligent Decomposition) computer program is knowledge-based software system for ordering sequence of modules and identifying possible multilevel structure for design problems such as large platforms in outer space. Groups modular subsystems on basis of interactions among them. Saves considerable amount of money and time in total design process, particularly in new design problem in which order of modules has not been defined. Originally written for design problems, also applicable to problems containing modules (processes) that take inputs and generate outputs. Available in three machine versions: Macintosh written in Symantec's Think C 3.01, Sun, and SGI IRIS in C language.

  7. Implementation of an open adoption research data management system for clinical studies.

    PubMed

    Müller, Jan; Heiss, Kirsten Ingmar; Oberhoffer, Renate

    2017-07-06

    Research institutions need to manage multiple studies with individual data sets, processing rules and different permissions. So far, there is no standard technology that provides an easy to use environment to create databases and user interfaces for clinical trials or research studies. Therefore various software solutions are being used-from custom software, explicitly designed for a specific study, to cost intensive commercial Clinical Trial Management Systems (CTMS) up to very basic approaches with self-designed Microsoft ® databases. The technology applied to conduct those studies varies tremendously from study to study, making it difficult to evaluate data across various studies (meta-analysis) and keeping a defined level of quality in database design, data processing, displaying and exporting. Furthermore, the systems being used to collect study data are often operated redundantly to systems used in patient care. As a consequence the data collection in studies is inefficient and data quality may suffer from unsynchronized datasets, non-normalized database scenarios and manually executed data transfers. With OpenCampus Research we implemented an open adoption software (OAS) solution on an open source basis, which provides a standard environment for state-of-the-art research database management at low cost.

  8. Task Management in the New ATLAS Production System

    NASA Astrophysics Data System (ADS)

    De, K.; Golubkov, D.; Klimentov, A.; Potekhin, M.; Vaniachine, A.; Atlas Collaboration

    2014-06-01

    This document describes the design of the new Production System of the ATLAS experiment at the LHC [1]. The Production System is the top level workflow manager which translates physicists' needs for production level processing and analysis into actual workflows executed across over a hundred Grid sites used globally by ATLAS. As the production workload increased in volume and complexity in recent years (the ATLAS production tasks count is above one million, with each task containing hundreds or thousands of jobs) there is a need to upgrade the Production System to meet the challenging requirements of the next LHC run while minimizing the operating costs. In the new design, the main subsystems are the Database Engine for Tasks (DEFT) and the Job Execution and Definition Interface (JEDI). Based on users' requests, DEFT manages inter-dependent groups of tasks (Meta-Tasks) and generates corresponding data processing workflows. The JEDI component then dynamically translates the task definitions from DEFT into actual workload jobs executed in the PanDA Workload Management System [2]. We present the requirements, design parameters, basics of the object model and concrete solutions utilized in building the new Production System and its components.

  9. A resilient and secure software platform and architecture for distributed spacecraft

    NASA Astrophysics Data System (ADS)

    Otte, William R.; Dubey, Abhishek; Karsai, Gabor

    2014-06-01

    A distributed spacecraft is a cluster of independent satellite modules flying in formation that communicate via ad-hoc wireless networks. This system in space is a cloud platform that facilitates sharing sensors and other computing and communication resources across multiple applications, potentially developed and maintained by different organizations. Effectively, such architecture can realize the functions of monolithic satellites at a reduced cost and with improved adaptivity and robustness. Openness of these architectures pose special challenges because the distributed software platform has to support applications from different security domains and organizations, and where information flows have to be carefully managed and compartmentalized. If the platform is used as a robust shared resource its management, configuration, and resilience becomes a challenge in itself. We have designed and prototyped a distributed software platform for such architectures. The core element of the platform is a new operating system whose services were designed to restrict access to the network and the file system, and to enforce resource management constraints for all non-privileged processes Mixed-criticality applications operating at different security labels are deployed and controlled by a privileged management process that is also pre-configuring all information flows. This paper describes the design and objective of this layer.

  10. Concept for Highly Mechanized Data Processing, Project 111.

    DTIC Science & Technology

    A concept is developed for a highly mechanized maintenance data processing system capable of deriving factors, influences, and correlations to raise...the level of logistics knowledge and lead to the design of a management-control system. (Author)

  11. Teaching Workflow Analysis and Lean Thinking via Simulation: A Formative Evaluation

    PubMed Central

    Campbell, Robert James; Gantt, Laura; Congdon, Tamara

    2009-01-01

    This article presents the rationale for the design and development of a video simulation used to teach lean thinking and workflow analysis to health services and health information management students enrolled in a course on the management of health information. The discussion includes a description of the design process, a brief history of the use of simulation in healthcare, and an explanation of how video simulation can be used to generate experiential learning environments. Based on the results of a survey given to 75 students as part of a formative evaluation, the video simulation was judged effective because it allowed students to visualize a real-world process (concrete experience), contemplate the scenes depicted in the video along with the concepts presented in class in a risk-free environment (reflection), develop hypotheses about why problems occurred in the workflow process (abstract conceptualization), and develop solutions to redesign a selected process (active experimentation). PMID:19412533

  12. Guide for Operational Configuration Management Program including the adjunct programs of design reconstitution and material condition and aging management. Part 1

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    This standard presents program criteria and implementation guidance for an operational configuration management program for DOE nuclear and non-nuclear facilities in the operational phase. Portions of this standard are also useful for other DOE processes, activities, and programs. This Part 1 contains foreword, glossary, acronyms, bibliography, and Chapter 1 on operational configuration management program principles. Appendices are included on configuration management program interfaces, and background material and concepts for operational configuration management.

  13. Prioritizing lean management practices in public and private hospitals.

    PubMed

    Hussain, Matloub; Malik, Mohsin

    2016-05-16

    Purpose - The purpose of this paper is to prioritize 21 healthcare wastes in public and private hospitals of United Arab Emirates (UAE). Design/methodology/approach - Seven healthcare wastes linked with lean management are further decomposed in to sub-criteria and to deal with this complexity of multi criteria decision-making process, analytical hierarchical process (AHP) method is used in this research. Findings - AHP framework for this study resulted in a ranking of 21 healthcare wastes in public and private hospitals of UAE. It has been found that management in private healthcare systems of UAE is putting more emphasis on the inventory waste. On the other hand, over processing waste has got highest weight in public hospitals of UAE. Research limitations/implications - The future directions of this research would be to apply a lean set of tools for the value stream optimization of the prioritized key improvement areas. Practical implications - This is a contribution to the continuing research into lean management, giving practitioners and designers a practical way for measuring and implementing lean practices across health organizations. Originality/value - The contribution of this research, through successive stages of data collection, measurement analysis and refinement, is a set of reliable and valid framework that can be subsequently used in conceptualization, prioritization of the waste reduction strategies in healthcare management.

  14. [Return to Work and Stay at Work - The Question of Successful Operational Integration Management].

    PubMed

    Ohlbrecht, Heike; Detka, Carsten; Kuczyk, Susanne; Lange, Bianca

    2018-06-01

    The study focuses on the question of how the design of operational integration management (OIM) can be optimized, especially in small and medium-sized enterprises (SMEs), and how previous experience with operational integration management can be used to develop preventive measures to ensure employability. The study follows a multi-perspective qualitative research design. It focused on the survey of 40 retrospective interviews with employees who have undergone different variants of the OIM. In addition, company and inter-company actors were examined through expert surveys. The evaluation of the interviews followed the heuristics of case reconstruction and the research strategy of Grounded Theory. Various influencing factors for the design of a operational integration management can be identified - the biographically anchored attitudes of employers and employees, the corporate culture as well as (company-specific) structural factors - which can become successful conditions and inhibitors of OIM processes in SMEs. Dilemmas that can hinder OIM processes are also evident. OIM processes can also have effects that go beyond the OIM objectives in a narrower sense. The reintegration and retention of the employability of employees can be successful above all if there is a trust-based corporate culture of mindfulness, appreciation and openness. This depends in particular on the attitudes of all those involved. But even in such a corporate culture, dilemmas and conflict potential have an influence on the success of the OIM process. Each company also needs internal and/or external actors with sufficient knowledge and skills to carry out an OIM. © Georg Thieme Verlag KG Stuttgart · New York.

  15. Forest landscape analysis and design: a process for developing and implementing land management objectives for landscape patterns.

    Treesearch

    Nancy Diaz; Dean Apostol

    1992-01-01

    This publication presents a Landscape Design and Analysis Process, along with some simple methods and tools for describing landscapes and their function. The information is qualitative in nature and highlights basic concepts, but does not address landscape ecology in great depth. Readers are encouraged to consult the list of selected references in Chapter 2 if they...

  16. Meta-Design and the Triple Learning Organization in Architectural Design Process

    NASA Astrophysics Data System (ADS)

    Barelkowski, Robert

    2017-10-01

    The paper delves into the improvement of Meta-Design methodology being the result of implementation of triple learning organization. Grown from the concept of reflective practice, it offers an opportunity to segregate and hierarchize both criteria and knowledge management and at least twofold application. It induces constant feedback loops recharging the basic level of “design” with second level of “learning from design” and third level of “learning from learning”. While learning from design reflects the absorption of knowledge, structuralization of skills, management of information, learning from learning gives deeper understanding and provides axiological perspective which is necessary when combining cultural, social, and abstract conceptual problems. The second level involves multidisciplinary applications imported from many engineering disciplines, technical sciences, but also psychological background, or social environment. The third level confronts these applications with their respective sciences (wide extra-architectural knowledge) and axiological issues. This distinction may be represented in difference between e.g. purposeful, systemic use of participatory design which again generates experience-by-doing versus use of disciplinary knowledge starting from its theoretical framework, then narrowed down to be relevant to particular design task. The paper discusses the application in two cases: awarded competition proposal of Digital Arts Museum in Madrid and BAIRI university building. Both cases summarize the effects of implementation and expose the impact of triple-loop knowledge circles onto design, teaching the architect or helping them to learn how to manage information flows and how to accommodate paradigm shifts in the architectural design process.

  17. Program Helps Decompose Complex Design Systems

    NASA Technical Reports Server (NTRS)

    Rogers, James L., Jr.; Hall, Laura E.

    1994-01-01

    DeMAID (A Design Manager's Aid for Intelligent Decomposition) computer program is knowledge-based software system for ordering sequence of modules and identifying possible multilevel structure for design problem. Groups modular subsystems on basis of interactions among them. Saves considerable money and time in total design process, particularly in new design problem in which order of modules has not been defined. Available in two machine versions: Macintosh and Sun.

  18. Adaptive design lessons from professional architects

    NASA Astrophysics Data System (ADS)

    Geiger, Ray W.; Snell, J. T.

    1993-09-01

    Psychocybernetic systems engineering design conceptualization is mimicking the evolutionary path of habitable environmental design and the professional practice of building architecture, construction, and facilities management. In pursuing better ways to design cellular automata and qualification classifiers in a design process, we have found surprising success in exploring certain more esoteric approaches, e.g., the vision of interdisciplinary artistic discovery in and around creative problem solving. Our evaluation in research into vision and hybrid sensory systems associated with environmental design and human factors has led us to discover very specific connections between the human spirit and quality design. We would like to share those very qualitative and quantitative parameters of engineering design, particularly as it relates to multi-faceted and future oriented design practice. Discussion covers areas of case- based techniques of cognitive ergonomics, natural modeling sources, and an open architectural process of means/goal satisfaction, qualified by natural repetition, gradation, rhythm, contrast, balance, and integrity of process.

  19. Processes in construction of failure management expert systems from device design information

    NASA Technical Reports Server (NTRS)

    Malin, Jane T.; Lance, Nick

    1987-01-01

    This paper analyzes the tasks and problem solving methods used by an engineer in constructing a failure management expert system from design information about the device to te diagnosed. An expert test engineer developed a trouble-shooting expert system based on device design information and experience with similar devices, rather than on specific expert knowledge gained from operating the device or troubleshooting its failures. The construction of the expert system was intensively observed and analyzed. This paper characterizes the knowledge, tasks, methods, and design decisions involved in constructing this type of expert system, and makes recommendations concerning tools for aiding and automating construction of such systems.

  20. An operations management system for the Space Station

    NASA Astrophysics Data System (ADS)

    Savage, Terry R.

    A description is provided of an Operations Management System (OMS) for the planned NASA Space Station. The OMS would be distributed both in space and on the ground, and provide a transparent interface to the communications and data processing facilities of the Space Station Program. The allocation of OMS responsibilities has, in the most current Space Station design, been fragmented among the Communications and Tracking Subsystem (CTS), the Data Management System (DMS), and a redefined OMS. In this current view, OMS is less of a participant in the real-time processing, and more an overseer of the health and management of the Space Station operations.

  1. Meta-manager: a requirements analysis.

    PubMed

    Cook, J F; Rozenblit, J W; Chacko, A K; Martinez, R; Timboe, H L

    1999-05-01

    The digital imaging network-picture-archiving and communications system (DIN-PACS) will be implemented in ten sites within the Great Plains Regional Medical Command (GPRMC). This network of PACS and teleradiology technology over a shared T1 network has opened the door for round the clock radiology coverage of all sites. However, the concept of a virtual radiology environment poses new issues for military medicine. A new workflow management system must be developed. This workflow management system will allow us to efficiently resolve these issues including quality of care, availability, severe capitation, and quality of the workforce. The design process of this management system must employ existing technology, operate over various telecommunication networks and protocols, be independent of platform operating systems, be flexible and scaleable, and involve the end user at the outset in the design process for which it is developed. Using the unified modeling language (UML), the specifications for this new business management system were created in concert between the University of Arizona and the GPRMC. These specifications detail a management system operating through a common object request brokered architecture (CORBA) environment. In this presentation, we characterize the Meta-Manager management system including aspects of intelligence, interfacility routing, fail-safe operations, and expected improvements in patient care and efficiency.

  2. 15 CFR 801.7 - General definitions.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ..., transportation, communications and data processing, retail and wholesale trade, advertising, accounting, construction, design, engineering, management consulting, real estate, professional services, entertainment...

  3. 15 CFR 801.7 - General definitions.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ..., transportation, communications and data processing, retail and wholesale trade, advertising, accounting, construction, design, engineering, management consulting, real estate, professional services, entertainment...

  4. ASSESSING AND MANAGING MERCURY FROM HISTORIC AND CURRENT MINING ACTIVITIES (PROGRAM FLYER)

    EPA Science Inventory

    The conference is designed to achieve three primary goals:

    Convey public, non-profit and priva sector perspectives on the assessment and management of mercury associated with mining processes, residuals and environmental impacters

    Identify data gaps and information ...

  5. NASA Integrated Services Environment

    NASA Technical Reports Server (NTRS)

    Ing, Sharon

    2005-01-01

    This slide presentation will begin with a discussion on NASA's current distributed environment for directories, identity management and account management. We will follow with information concerning the drivers, design, reviews and implementation of the NISE Project. The final component of the presentation discusses processes used, status and conclusions.

  6. Extent and Impacts of the Virginia Department of Transportation’s Exception Process for Access Management Design Standards

    DOT National Transportation Integrated Search

    2018-06-01

    The Virginia Department of Transportation (VDOT) Road Design Manual requires that new commercial entrances meet certain minimum spacing standards depending on a facilitys speed limit and functional classification. Landowners, however, may request ...

  7. Heuristics in Managing Complex Clinical Decision Tasks in Experts’ Decision Making

    PubMed Central

    Islam, Roosan; Weir, Charlene; Del Fiol, Guilherme

    2016-01-01

    Background Clinical decision support is a tool to help experts make optimal and efficient decisions. However, little is known about the high level of abstractions in the thinking process for the experts. Objective The objective of the study is to understand how clinicians manage complexity while dealing with complex clinical decision tasks. Method After approval from the Institutional Review Board (IRB), three clinical experts were interviewed the transcripts from these interviews were analyzed. Results We found five broad categories of strategies by experts for managing complex clinical decision tasks: decision conflict, mental projection, decision trade-offs, managing uncertainty and generating rule of thumb. Conclusion Complexity is created by decision conflicts, mental projection, limited options and treatment uncertainty. Experts cope with complexity in a variety of ways, including using efficient and fast decision strategies to simplify complex decision tasks, mentally simulating outcomes and focusing on only the most relevant information. Application Understanding complex decision making processes can help design allocation based on the complexity of task for clinical decision support design. PMID:27275019

  8. Heuristics in Managing Complex Clinical Decision Tasks in Experts' Decision Making.

    PubMed

    Islam, Roosan; Weir, Charlene; Del Fiol, Guilherme

    2014-09-01

    Clinical decision support is a tool to help experts make optimal and efficient decisions. However, little is known about the high level of abstractions in the thinking process for the experts. The objective of the study is to understand how clinicians manage complexity while dealing with complex clinical decision tasks. After approval from the Institutional Review Board (IRB), three clinical experts were interviewed the transcripts from these interviews were analyzed. We found five broad categories of strategies by experts for managing complex clinical decision tasks: decision conflict, mental projection, decision trade-offs, managing uncertainty and generating rule of thumb. Complexity is created by decision conflicts, mental projection, limited options and treatment uncertainty. Experts cope with complexity in a variety of ways, including using efficient and fast decision strategies to simplify complex decision tasks, mentally simulating outcomes and focusing on only the most relevant information. Understanding complex decision making processes can help design allocation based on the complexity of task for clinical decision support design.

  9. PRMS Data Warehousing Prototype

    NASA Technical Reports Server (NTRS)

    Guruvadoo, Eranna K.

    2001-01-01

    Project and Resource Management System (PRMS) is a web-based, mid-level management tool developed at KSC to provide a unified enterprise framework for Project and Mission management. The addition of a data warehouse as a strategic component to the PRMS is investigated through the analysis design and implementation processes of a data warehouse prototype. As a proof of concept, a demonstration of the prototype with its OLAP's technology for multidimensional data analysis is made. The results of the data analysis and the design constraints are discussed. The prototype can be used to motivate interest and support for an operational data warehouse.

  10. PRMS Data Warehousing Prototype

    NASA Technical Reports Server (NTRS)

    Guruvadoo, Eranna K.

    2002-01-01

    Project and Resource Management System (PRMS) is a web-based, mid-level management tool developed at KSC to provide a unified enterprise framework for Project and Mission management. The addition of a data warehouse as a strategic component to the PRMS is investigated through the analysis, design and implementation processes of a data warehouse prototype. As a proof of concept, a demonstration of the prototype with its OLAP's technology for multidimensional data analysis is made. The results of the data analysis and the design constraints are discussed. The prototype can be used to motivate interest and support for an operational data warehouse.

  11. MO-E-9A-01: Risk Based Quality Management: TG100 In Action

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Huq, M; Palta, J; Dunscombe, P

    2014-06-15

    One of the goals of quality management in radiation therapy is to gain high confidence that patients will receive the prescribed treatment correctly. To accomplish these goals professional societies such as the American Association of Physicists in Medicine (AAPM) has published many quality assurance (QA), quality control (QC), and quality management (QM) guidance documents. In general, the recommendations provided in these documents have emphasized on performing device-specific QA at the expense of process flow and protection of the patient against catastrophic errors. Analyses of radiation therapy incidents find that they are most often caused by flaws in the overall therapymore » process, from initial consult through final treatment, than by isolated hardware or computer failures detectable by traditional physics QA. This challenge is shared by many intrinsically hazardous industries. Risk assessment tools and analysis techniques have been developed to define, identify, and eliminate known and/or potential failures, problems, or errors, from a system, process and/or service before they reach the customer. These include, but are not limited to, process mapping, failure modes and effects analysis (FMEA), fault tree analysis (FTA), and establishment of a quality management program that best avoids the faults and risks that have been identified in the overall process. These tools can be easily adapted to radiation therapy practices because of their simplicity and effectiveness to provide efficient ways to enhance the safety and quality of treatment processes. Task group 100 (TG100) of AAPM has developed a risk-based quality management program that uses these tools. This session will be devoted to a discussion of these tools and how these tools can be used in a given radiotherapy clinic to develop a risk based QM program. Learning Objectives: Learn how to design a process map for a radiotherapy process. Learn how to perform a FMEA analysis for a given process. Learn what Fault tree analysis is all about. Learn how to design a quality management program based upon the information obtained from process mapping, FMEA and FTA.« less

  12. Design and field test of collaborative tools in the service of an innovative organization

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    De Beler, N.; Parfouru, S.

    2012-07-01

    This paper presents the design process of collaborative tools, based on ICT, aiming at supporting the tasks of the team that manages an outage of an energy production plant for maintenance activities. The design process follows an iterative and multidisciplinary approach, based on a collective tasks modeling of the outage management team in the light of Socio Organizational and Human (SOH) field studies, and on the state of the art of ICT. Field test of the collaborative tools designed plays a great place in this approach, allowing taking into account the operational world but involves also some risks which mustmore » be managed. To implement tools on all the production plants, we build an 'operational concept' with a level of description which authorizes the evolution of tools and allows some local adaptations. The field tests provide lessons on the ICT topics. For examples: the status of the remote access tools, the potential of use of a given information input by an actor for several individual and collective purposes, the actors perception of the tools meaning, and the requirements for supporting the implementation of change. (authors)« less

  13. Software engineering and Ada in design

    NASA Technical Reports Server (NTRS)

    Oneill, Don

    1986-01-01

    Modern software engineering promises significant reductions in software costs and improvements in software quality. The Ada language is the focus for these software methodology and tool improvements. The IBM FSD approach, including the software engineering practices that guide the systematic design and development of software products and the management of the software process are examined. The revised Ada design language adaptation is revealed. This four level design methodology is detailed including the purpose of each level, the management strategy that integrates the software design activity with the program milestones, and the technical strategy that maps the Ada constructs to each level of design. A complete description of each design level is provided along with specific design language recording guidelines for each level. Finally, some testimony is offered on education, tools, architecture, and metrics resulting from project use of the four level Ada design language adaptation.

  14. Campus Demonstration Sites for Sustainable Systems and Design: Five "Creation" Stories.

    ERIC Educational Resources Information Center

    Jack, Kathy; Ihara, Dan, Ed.

    This paper provides a summary of the development and management of five campus demonstration sites designed to create harmony with natural systems and meet current student needs without compromising the needs of future generations. Information for each campus includes an overview of the site, project origins, the proposal and design process, the…

  15. 78 FR 5462 - Agency Information Collection Activities; Submission for Office of Management and Budget Review...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-25

    ... these decisionmaking processes will be applied by FDA to help design effective communication strategies..., beliefs, and behaviors--and use risk communications; (2) more efficiently and effectively design messages... provided about the design and methodology of the pretests and the studies to effectively comment on the...

  16. Organizational Learning and Product Design Management: Towards a Theoretical Model.

    ERIC Educational Resources Information Center

    Chiva-Gomez, Ricardo; Camison-Zornoza, Cesar; Lapiedra-Alcami, Rafael

    2003-01-01

    Case studies of four Spanish ceramics companies were used to construct a theoretical model of 14 factors essential to organizational learning. One set of factors is related to the conceptual-analytical phase of the product design process and the other to the creative-technical phase. All factors contributed to efficient product design management…

  17. Towards Application of NASA Standard for Models and Simulations in Aeronautical Design Process

    NASA Astrophysics Data System (ADS)

    Vincent, Luc; Dunyach, Jean-Claude; Huet, Sandrine; Pelissier, Guillaume; Merlet, Joseph

    2012-08-01

    Even powerful computational techniques like simulation endure limitations in their validity domain. Consequently using simulation models requires cautions to avoid making biased design decisions for new aeronautical products on the basis of inadequate simulation results. Thus the fidelity, accuracy and validity of simulation models shall be monitored in context all along the design phases to build confidence in achievement of the goals of modelling and simulation.In the CRESCENDO project, we adapt the Credibility Assessment Scale method from NASA standard for models and simulations from space programme to the aircraft design in order to assess the quality of simulations. The proposed eight quality assurance metrics aggregate information to indicate the levels of confidence in results. They are displayed in management dashboard and can secure design trade-off decisions at programme milestones.The application of this technique is illustrated in aircraft design context with specific thermal Finite Elements Analysis. This use case shows how to judge the fitness- for-purpose of simulation as Virtual testing means and then green-light the continuation of Simulation Lifecycle Management (SLM) process.

  18. The Effect of a "Learner as Multimedia Designer" Environment on At-Risk High School Students' Motivation and Learning of Design Knowledge.

    ERIC Educational Resources Information Center

    Liu, Min; Rutledge, Keith

    This paper investigates the effect of engaging students in designing interactive multimedia programs. The design process has been shown to heighten motivation and to develop skills in project management, research, organization and representation, presentation, and reflection. At the same time, previous studies have also revealed that it is…

  19. Software-Engineering Process Simulation (SEPS) model

    NASA Technical Reports Server (NTRS)

    Lin, C. Y.; Abdel-Hamid, T.; Sherif, J. S.

    1992-01-01

    The Software Engineering Process Simulation (SEPS) model is described which was developed at JPL. SEPS is a dynamic simulation model of the software project development process. It uses the feedback principles of system dynamics to simulate the dynamic interactions among various software life cycle development activities and management decision making processes. The model is designed to be a planning tool to examine tradeoffs of cost, schedule, and functionality, and to test the implications of different managerial policies on a project's outcome. Furthermore, SEPS will enable software managers to gain a better understanding of the dynamics of software project development and perform postmodern assessments.

  20. [How the information system can contribute to the implementation of a risk management program in a hospital?].

    PubMed

    Staccini, P; Quaranta, J F; Staccini-Myx, A; Veyres, P; Jambou, P

    2003-09-01

    Nowadays, information system is recognised as one of the key points of the management strategy. An information system is regarded conceptualised as a mean to link 3 aspects of a firm (structure, organisation rules and staff). Its design and implementation have to meet the objectives of medical and economical evaluation, especially risk management objectives. In order to identify, analyse, reduce and prevent the occurrence of adverse events, and also to measure the efficacy and efficiency of the production of care services, the design of information systems should be based on a process analysis in order to describe and classify all the working practices within the hospital. According to various methodologies (usually top-down analysis), each process can be divided into activities. Each activity (especially each care activity) can be described according to its potential risks and expected results. For care professionals performing a task, the access to official or internal guidelines and the adverse events reporting forms has also to be defined. Putting together all the elements of such a process analysis will contribute to integrate, into daily practice, the management of risks, supported by the information system.

  1. Design and implementation of a nuclear weapons management system submodule: Shipboard security force system. Master's thesis

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Settlemyer, S.R.

    1991-09-01

    The Nuclear Weapons Management System combines the strengths of an expert system with the flexibility of a database management system to assist the Weapons Officer, Security Officer, and the Personnel Reliability Program Officer in the performance of administrative duties associated with the nuclear weapons programs in the United States Navy. This thesis examines the need for, and ultimately the design of, a system that will assist the Security Officer in administrative duties associated with the Shipboard Self Defense Force. This system, designed and coded utilizing dBASE IV, can be implemented as a stand alone system. Furthermore, it interfaces with themore » expert system submodule that handles the PRP screening process.« less

  2. HMI conventions for process control graphics.

    PubMed

    Pikaar, Ruud N

    2012-01-01

    Process operators supervise and control complex processes. To enable the operator to do an adequate job, instrumentation and process control engineers need to address several related topics, such as console design, information design, navigation, and alarm management. In process control upgrade projects, usually a 1:1 conversion of existing graphics is proposed. This paper suggests another approach, efficiently leading to a reduced number of new powerful process graphics, supported by a permanent process overview displays. In addition a road map for structuring content (process information) and conventions for the presentation of objects, symbols, and so on, has been developed. The impact of the human factors engineering approach on process control upgrade projects is illustrated by several cases.

  3. Waste-efficient materials procurement for construction projects: A structural equation modelling of critical success factors.

    PubMed

    Ajayi, Saheed O; Oyedele, Lukumon O

    2018-05-01

    Albeit the understanding that construction waste is caused by activities ranging from all stages of project delivery process, research efforts have been concentrated on design and construction stages, while the possibility of reducing waste through materials procurement process is widely neglected. This study aims at exploring and confirming strategies for achieving waste-efficient materials procurement in construction activities. The study employs sequential exploratory mixed method approach as its methodological framework, using focus group discussion, statistical analysis and structural equation modelling. The study suggests that for materials procurement to enhance waste minimisation in construction projects, the procurement process would be characterised by four features. These include suppliers' commitment to low waste measures, low waste purchase management, effective materials delivery management and waste-efficient Bill of Quantity, all of which have significant impacts on waste minimisation. This implies that commitment of materials suppliers to such measures as take back scheme and flexibility in supplying small materials quantity, among others, are expected of materials procurement. While low waste purchase management stipulates the need for such measures as reduced packaging and consideration of pre-assembled/pre-cut materials, efficient delivery management entails effective delivery and storage system as well as adequate protection of materials during the delivery process, among others. Waste-efficient specification and bill of quantity, on the other hand, requires accurate materials take-off and ordering of materials based on accurately prepared design documents and bill of quantity. Findings of this study could assist in understanding a set of measures that should be taken during materials procurement process, thereby corroborating waste management practices at other stages of project delivery process. Copyright © 2018. Published by Elsevier Ltd.

  4. Automation of the CFD Process on Distributed Computing Systems

    NASA Technical Reports Server (NTRS)

    Tejnil, Ed; Gee, Ken; Rizk, Yehia M.

    2000-01-01

    A script system was developed to automate and streamline portions of the CFD process. The system was designed to facilitate the use of CFD flow solvers on supercomputer and workstation platforms within a parametric design event. Integrating solver pre- and postprocessing phases, the fully automated ADTT script system marshalled the required input data, submitted the jobs to available computational resources, and processed the resulting output data. A number of codes were incorporated into the script system, which itself was part of a larger integrated design environment software package. The IDE and scripts were used in a design event involving a wind tunnel test. This experience highlighted the need for efficient data and resource management in all parts of the CFD process. To facilitate the use of CFD methods to perform parametric design studies, the script system was developed using UNIX shell and Perl languages. The goal of the work was to minimize the user interaction required to generate the data necessary to fill a parametric design space. The scripts wrote out the required input files for the user-specified flow solver, transferred all necessary input files to the computational resource, submitted and tracked the jobs using the resource queuing structure, and retrieved and post-processed the resulting dataset. For computational resources that did not run queueing software, the script system established its own simple first-in-first-out queueing structure to manage the workload. A variety of flow solvers were incorporated in the script system, including INS2D, PMARC, TIGER and GASP. Adapting the script system to a new flow solver was made easier through the use of object-oriented programming methods. The script system was incorporated into an ADTT integrated design environment and evaluated as part of a wind tunnel experiment. The system successfully generated the data required to fill the desired parametric design space. This stressed the computational resources required to compute and store the information. The scripts were continually modified to improve the utilization of the computational resources and reduce the likelihood of data loss due to failures. An ad-hoc file server was created to manage the large amount of data being generated as part of the design event. Files were stored and retrieved as needed to create new jobs and analyze the results. Additional information is contained in the original.

  5. A method of distributed avionics data processing based on SVM classifier

    NASA Astrophysics Data System (ADS)

    Guo, Hangyu; Wang, Jinyan; Kang, Minyang; Xu, Guojing

    2018-03-01

    Under the environment of system combat, in order to solve the problem on management and analysis of the massive heterogeneous data on multi-platform avionics system, this paper proposes a management solution which called avionics "resource cloud" based on big data technology, and designs an aided decision classifier based on SVM algorithm. We design an experiment with STK simulation, the result shows that this method has a high accuracy and a broad application prospect.

  6. Why Process Improvement Training Fails

    ERIC Educational Resources Information Center

    Lu, Dawei; Betts, Alan

    2011-01-01

    Purpose: The purpose of this paper is to explore the underlying reasons why providing process improvement training, by itself, may not be sufficient to achieve the desired outcome of improved processes; and to attempt a conceptual framework of management training for more effective improvement. Design/methodology/approach: Two similar units within…

  7. Reengineering the project design process

    NASA Astrophysics Data System (ADS)

    Kane Casani, E.; Metzger, Robert M.

    1995-01-01

    In response to the National Aeronautics and Space Administration's goal of working faster, better, and cheaper, the Jet Propulsion Laboratory (JPL) has developed extensive plans to minimize cost, maximize customer and employee satisfaction, and implement small- and moderate-size missions. These plans include improved management structures and processes, enhanced technical design processes, the incorporation of new technology, and the development of more economical space- and ground-system designs. The Laboratory's new Flight Projects Implementation Development Office has been chartered to oversee these innovations and the reengineering of JPL's project design process, including establishment of the Project Design Center (PDC) and the Flight System Testbed (FST). Reengineering at JPL implies a cultural change whereby the character of the Laboratory's design process will change from sequential to concurrent and from hierarchical to parallel. The Project Design Center will support missions offering high science return, design to cost, demonstrations of new technology, and rapid development. Its computer-supported environment will foster high-fidelity project life-cycle development and more accurate cost estimating. These improvements signal JPL's commitment to meeting the challenges of space exploration in the next century.

  8. Teaching organization theory for healthcare management: three applied learning methods.

    PubMed

    Olden, Peter C

    2006-01-01

    Organization theory (OT) provides a way of seeing, describing, analyzing, understanding, and improving organizations based on patterns of organizational design and behavior (Daft 2004). It gives managers models, principles, and methods with which to diagnose and fix organization structure, design, and process problems. Health care organizations (HCOs) face serious problems such as fatal medical errors, harmful treatment delays, misuse of scarce nurses, costly inefficiency, and service failures. Some of health care managers' most critical work involves designing and structuring their organizations so their missions, visions, and goals can be achieved-and in some cases so their organizations can survive. Thus, it is imperative that graduate healthcare management programs develop effective approaches for teaching OT to students who will manage HCOs. Guided by principles of education, three applied teaching/learning activities/assignments were created to teach OT in a graduate healthcare management program. These educationalmethods develop students' competency with OT applied to HCOs. The teaching techniques in this article may be useful to faculty teaching graduate courses in organization theory and related subjects such as leadership, quality, and operation management.

  9. Display management subsystem, version 1: A user's eye view

    NASA Technical Reports Server (NTRS)

    Parker, Dolores

    1986-01-01

    The structure and application functions of the Display Management Subsystem (DMS) are described. The DMS, a subsystem of the Transportable Applications Executive (TAE), was designed to provide a device-independent interface for an image processing and display environment. The system is callable by C and FORTRAN applications, portable to accommodate different image analysis terminals, and easily expandable to meet local needs. Generic applications are also available for performing many image processing tasks.

  10. Enabling Healthcare IT Governance: Human Task Management Service for Administering Emergency Department's Resources for Efficient Patient Flow.

    PubMed

    Rodriguez, Salvador; Aziz, Ayesha; Chatwin, Chris

    2014-01-01

    The use of Health Information Technology (HIT) to improve healthcare service delivery is constantly increasing due to research advances in medical science and information systems. Having a fully automated process solution for a Healthcare Organization (HCO) requires a combination of organizational strategies along with a selection of technologies that facilitate the goal of improving clinical outcomes. HCOs, requires dynamic management of care capability to realize the full potential of HIT. Business Process Management (BPM) is being increasingly adopted to streamline the healthcare service delivery and management processes. Emergency Departments (EDs) provide a case in point, which require multidisciplinary resources and services to deliver effective clinical outcomes. Managed care involves the coordination of a range of services in an ED. Although fully automated processes in emergency care provide a cutting edge example of service delivery, there are many situations that require human interactions with the computerized systems; e.g. Medication Approvals, care transfer, acute patient care. This requires a coordination mechanism for all the resources, computer and human, to work side by side to provide the best care. To ensure evidence-based medical practice in ED, we have designed a Human Task Management service to model the process of coordination of ED resources based on the UK's NICE Clinical guideline for managing the care of acutely ill patients. This functionality is implemented using Java Business process Management (jBPM).

  11. Systems engineering implementation in the preliminary design phase of the Giant Magellan Telescope

    NASA Astrophysics Data System (ADS)

    Maiten, J.; Johns, M.; Trancho, G.; Sawyer, D.; Mady, P.

    2012-09-01

    Like many telescope projects today, the 24.5-meter Giant Magellan Telescope (GMT) is truly a complex system. The primary and secondary mirrors of the GMT are segmented and actuated to support two operating modes: natural seeing and adaptive optics. GMT is a general-purpose telescope supporting multiple science instruments operated in those modes. GMT is a large, diverse collaboration and development includes geographically distributed teams. The need to implement good systems engineering processes for managing the development of systems like GMT becomes imperative. The management of the requirements flow down from the science requirements to the component level requirements is an inherently difficult task in itself. The interfaces must also be negotiated so that the interactions between subsystems and assemblies are well defined and controlled. This paper will provide an overview of the systems engineering processes and tools implemented for the GMT project during the preliminary design phase. This will include requirements management, documentation and configuration control, interface development and technical risk management. Because of the complexity of the GMT system and the distributed team, using web-accessible tools for collaboration is vital. To accomplish this GMTO has selected three tools: Cognition Cockpit, Xerox Docushare, and Solidworks Enterprise Product Data Management (EPDM). Key to this is the use of Cockpit for managing and documenting the product tree, architecture, error budget, requirements, interfaces, and risks. Additionally, drawing management is accomplished using an EPDM vault. Docushare, a documentation and configuration management tool is used to manage workflow of documents and drawings for the GMT project. These tools electronically facilitate collaboration in real time, enabling the GMT team to track, trace and report on key project metrics and design parameters.

  12. Building quality into medical product software design.

    PubMed

    Mallory, S R

    1993-01-01

    The software engineering and quality assurance disciplines are a requisite to the design of safe and effective software-based medical devices. It is in the areas of software methodology and process that the most beneficial application of these disciplines to software development can be made. Software is a product of complex operations and methodologies and is not amenable to the traditional electromechanical quality assurance processes. Software quality must be built in by the developers, with the software verification and validation engineers acting as the independent instruments for ensuring compliance with performance objectives and with development and maintenance standards. The implementation of a software quality assurance program is a complex process involving management support, organizational changes, and new skill sets, but the benefits are profound. Its rewards provide safe, reliable, cost-effective, maintainable, and manageable software, which may significantly speed the regulatory review process and therefore potentially shorten the overall time to market. The use of a trial project can greatly facilitate the learning process associated with the first-time application of a software quality assurance program.

  13. Designing and examining e-waste recycling process: methodology and case studies.

    PubMed

    Li, Jinhui; He, Xin; Zeng, Xianlai

    2017-03-01

    Increasing concerns on resource depletion and environmental pollution have largely obliged electrical and electronic waste (e-waste) should be tackled in an environmentally sound manner. Recycling process development is regarded as the most effective and fundamental to solve the e-waste problem. Based on global achievements related to e-waste recycling in the past 15 years, we first propose a theory to design an e-waste recycling process, including measuring e-waste recyclability and selection of recycling process. And we summarize the indicators and tools in terms of resource dimension, environmental dimension, and economic dimension, to examine the e-waste recycling process. Using the sophisticated experience and adequate information of e-waste management, spent lithium-ion batteries and waste printed circuit boards are chosen as case studies to implement and verify the proposed method. All the potential theory and obtained results in this work can contribute to future e-waste management toward best available techniques and best environmental practices.

  14. Organized DFM

    NASA Astrophysics Data System (ADS)

    Sato, Takashi; Honma, Michio; Itoh, Hiroyuki; Iriki, Nobuyuki; Kobayashi, Sachiko; Miyazaki, Norihiko; Onodera, Toshio; Suzuki, Hiroyuki; Yoshioka, Nobuyuki; Arima, Sumika; Kadota, Kazuya

    2009-04-01

    The category and objective of DFM production management are shown. DFM is not limited to an activity within a particular unit process in design and process. A new framework for DFM is required. DFM should be a total solution for the common problems of all processes. Each of them must be linked to one another organically. After passing through the whole of each process on the manufacturing platform, quality of final products is guaranteed and products are shipped to the market. The information platform is layered with DFM, APC, and AEC. Advanced DFM is not DFM for partial optimization of the lithography process and the design, etc. and it should be Organized DFM. They are managed with high-level organizational IQ. The interim quality between each step of the flow should be visualized. DFM will be quality engineering if it is Organized DFM and common metrics of the quality are provided. DFM becomes quality engineering through effective implementation of common industrial metrics and standardized technology. DFM is differential technology, but can leverage standards for efficient development.

  15. Managed care for Medicare: some considerations in designing effective information provision programs.

    PubMed

    Jayanti, R K

    2001-01-01

    Consumer information-processing theory provides a useful framework for policy makers concerned with regulating information provided by managed care organizations. The assumption that consumers are rational information processors and providing more information is better is questioned in this paper. Consumer research demonstrates that when faced with an uncertain decision, consumers adopt simplifying strategies leading to sub-optimal choices. A discussion on how consumers process risk information and the effects of various informational formats on decision outcomes is provided. Categorization theory is used to propose guidelines with regard to providing effective information to consumers choosing among competing managed care plans. Public policy implications borne out of consumer information-processing theory conclude the article.

  16. Knowledge management in a waste based biorefinery in the QbD paradigm.

    PubMed

    Rathore, Anurag S; Chopda, Viki R; Gomes, James

    2016-09-01

    Shifting resource base from fossil feedstock to renewable raw materials for production of chemical products has opened up an area of novel applications of industrial biotechnology-based process tools. This review aims to provide a concise and focused discussion on recent advances in knowledge management to facilitate efficient and optimal operation of a biorefinery. Application of quality by design (QbD) and process analytical technology (PAT) as tools for knowledge creation and management at different levels has been highlighted. Role of process integration, government policies, knowledge exchange through collaboration, and use of databases and computational tools have also been touched upon. Copyright © 2016 Elsevier Ltd. All rights reserved.

  17. Open source cardiology electronic health record development for DIGICARDIAC implementation

    NASA Astrophysics Data System (ADS)

    Dugarte, Nelson; Medina, Rubén.; Huiracocha, Lourdes; Rojas, Rubén.

    2015-12-01

    This article presents the development of a Cardiology Electronic Health Record (CEHR) system. Software consists of a structured algorithm designed under Health Level-7 (HL7) international standards. Novelty of the system is the integration of high resolution ECG (HRECG) signal acquisition and processing tools, patient information management tools and telecardiology tools. Acquisition tools are for management and control of the DIGICARDIAC electrocardiograph functions. Processing tools allow management of HRECG signal analysis searching for indicative patterns of cardiovascular pathologies. Telecardiology tools incorporation allows system communication with other health care centers decreasing access time to the patient information. CEHR system was completely developed using open source software. Preliminary results of process validation showed the system efficiency.

  18. 75 FR 29725 - Mid-Atlantic Fishery Management Council; Public Hearings

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-27

    ... management process; the biological and socio-economic outcomes of a catch share system and how such outcomes depend on specific program design features; the possible need for changes to existing information...) fisheries and that uncontrolled activation of latent capacity could cause negative economic effects for...

  19. Decision Support Model for Municipal Solid Waste Management at Department of Defense Installations.

    DTIC Science & Technology

    1995-12-01

    Huang uses "Grey Dynamic Programming for Waste Management Planning Under Uncertainty." Fuzzy Dynamic Programming (FDP) is usually designed to...and Composting Programs. Washington: Island Press, 1991. Junio, D.F. Development of an Analytical Hierarchy Process ( AHP ) Model for Siting of

  20. Directed Consultation, the SEALS Model, and Teachers' Classroom Management

    ERIC Educational Resources Information Center

    Motoca, Luci M.; Farmer, Thomas W.; Hamm, Jill V.; Byun, Soo-yong; Lee, David L.; Brooks, Debbie S.; Rucker, Nkecha; Moohr, Michele M.

    2014-01-01

    Directed consultation is presented as a professional development framework to guide and support teachers in the implementation of evidence-based interventions that involve contextual and process-oriented approaches designed to be incorporated into daily classroom management. This approach consists of four components: pre-intervention observations…

  1. Designing a Digital Instructional Management System To Optimize Early Education.

    ERIC Educational Resources Information Center

    Mooij, Ton

    2002-01-01

    Discusses digital instructional management systems (DIMSs) and describes a pilot study conducted in two Dutch kindergartens with a prototype DIMS that included individualization and optimization, that is matching curriculum with learner characteristics. Topics include learning processes for children at risk; and future plans. (LRW)

  2. The Management of Instruction.

    ERIC Educational Resources Information Center

    Tosti, Donald T.; Harmon, N. Paul

    A new conceptual approach to the analysis of educational systems is defined. It centers attention on the instructional management decision making process, which serves to mediate the activities of the students and learning environment, so that much of the present confusion surrounding the design of educational systems is eliminated. Instructional…

  3. VoCATS User Guide. [Draft.

    ERIC Educational Resources Information Center

    North Carolina State Dept. of Public Instruction, Raleigh. Div. of Vocational Education Services.

    This guide focuses on use of the North Carolina Vocational Competency Achievement Tracking System (VoCATS)-designated software in the instructional management process. (VoCATS is a competency-based, computer-based instructional management system that allows the collection of data on student performance achievement prior to, during, and following…

  4. Situating Green Infrastructure in Context: A Framework for Adaptive Socio-Hydrology in Cities

    EPA Science Inventory

    Management of urban hydrologic processes using green infrastructure (GI) has largely focused on storm water management. Thus, design and implementation of GI usually rely on physical site characteristics and local rainfall patterns, and do not typically account for human or socia...

  5. Strategic Enrollment Management: A Primer for Campus Administrators.

    ERIC Educational Resources Information Center

    Dolence, Michael G.

    This booklet provides an overview of key concepts of Strategic Enrollment Management (SEM), a comprehensive process designed to help institutions of higher education achieve and maintain the optimum student recruitment, retention, and graduation rates. "Optimum" here is defined within the academic context of the particular institution. Primary…

  6. For operation of the Computer Software Management and Information Center (COSMIC)

    NASA Technical Reports Server (NTRS)

    Carmon, J. L.

    1983-01-01

    During the month of June, the Survey Research Center (SRC) at the University of Georgia designed new benefits questionnaires for computer software management and information center (COSMIC). As a test of their utility, these questionnaires are now used in the benefits identification process.

  7. Model Orlando regionally efficient travel management coordination center (MORE TMCC), phase II : final report.

    DOT National Transportation Integrated Search

    2012-09-01

    The final report for the Model Orlando Regionally Efficient Travel Management Coordination Center (MORE TMCC) presents the details of : the 2-year process of the partial deployment of the original MORE TMCC design created in Phase I of this project...

  8. Total quality management in orthodontic practice.

    PubMed

    Atta, A E

    1999-12-01

    Quality is the buzz word for the new Millennium. Patients demand it, and we must serve it. Yet one must identify it. Quality is not imaging or public relations; it is a business process. This short article presents quality as a balance of three critical notions: core clinical competence, perceived values that our patients seek and want, and the cost of quality. Customer satisfaction is a variable that must be identified for each practice. In my practice, patients perceive quality as communication and time, be it treatment or waiting time. Time is a value and cost that must be managed effectively. Total quality management is a business function; it involves diagnosis, design, implementation, and measurement of the process, the people, and the service. Kazien is a function that reduces value services, eliminates waste, and manages time and cost in the process. Total quality management is a total commitment for continuous improvement.

  9. Living Design Memory: Framework, Implementation, Lessons Learned.

    ERIC Educational Resources Information Center

    Terveen, Loren G.; And Others

    1995-01-01

    Discusses large-scale software development and describes the development of the Designer Assistant to improve software development effectiveness. Highlights include the knowledge management problem; related work, including artificial intelligence and expert systems, software process modeling research, and other approaches to organizational memory;…

  10. AOIPS water resources data management system

    NASA Technical Reports Server (NTRS)

    Vanwie, P.

    1977-01-01

    The text and computer-generated displays used to demonstrate the AOIPS (Atmospheric and Oceanographic Information Processing System) water resources data management system are investigated. The system was developed to assist hydrologists in analyzing the physical processes occurring in watersheds. It was designed to alleviate some of the problems encountered while investigating the complex interrelationships of variables such as land-cover type, topography, precipitation, snow melt, surface runoff, evapotranspiration, and streamflow rates. The system has an interactive image processing capability and a color video display to display results as they are obtained.

  11. X-33/RLV System Health Management/Vehicle Health Management

    NASA Technical Reports Server (NTRS)

    Mouyos, William; Wangu, Srimal

    1998-01-01

    To reduce operations costs, Reusable Launch Vehicles (RLVS) must include highly reliable robust subsystems which are designed for simple repair access with a simplified servicing infrastructure, and which incorporate expedited decision-making about faults and anomalies. A key component for the Single Stage To Orbit (SSTO) RLV system used to meet these objectives is System Health Management (SHM). SHM incorporates Vehicle Health Management (VHM), ground processing associated with the vehicle fleet (GVHM), and Ground Infrastructure Health Management (GIHM). The primary objective of SHM is to provide an automated and paperless health decision, maintenance, and logistics system. Sanders, a Lockheed Martin Company, is leading the design, development, and integration of the SHM system for RLV and for X-33 (a sub-scale, sub-orbit Advanced Technology Demonstrator). Many critical technologies are necessary to make SHM (and more specifically VHM) practical, reliable, and cost effective. This paper will present the X-33 SHM design which forms the baseline for the RLV SHM, and it will discuss applications of advanced technologies to future RLVs. In addition, this paper will describe a Virtual Design Environment (VDE) which is being developed for RLV. This VDE will allow for system design engineering, as well as program management teams, to accurately and efficiently evaluate system designs, analyze the behavior of current systems, and predict the feasibility of making smooth and cost-efficient transitions from older technologies to newer ones. The RLV SHM design methodology will reduce program costs, decrease total program life-cycle time, and ultimately increase mission success.

  12. Towards an intelligent hospital environment: OR of the future.

    PubMed

    Sutherland, Jeffrey V; van den Heuvel, Willem-Jan; Ganous, Tim; Burton, Matthew M; Kumar, Animesh

    2005-01-01

    Patients, providers, payers, and government demand more effective and efficient healthcare services, and the healthcare industry needs innovative ways to re-invent core processes. Business process reengineering (BPR) showed adopting new hospital information systems can leverage this transformation and workflow management technologies can automate process management. Our research indicates workflow technologies in healthcare require real time patient monitoring, detection of adverse events, and adaptive responses to breakdown in normal processes. Adaptive workflow systems are rarely implemented making current workflow implementations inappropriate for healthcare. The advent of evidence based medicine, guideline based practice, and better understanding of cognitive workflow combined with novel technologies including Radio Frequency Identification (RFID), mobile/wireless technologies, internet workflow, intelligent agents, and Service Oriented Architectures (SOA) opens up new and exciting ways of automating business processes. Total situational awareness of events, timing, and location of healthcare activities can generate self-organizing change in behaviors of humans and machines. A test bed of a novel approach towards continuous process management was designed for the new Weinburg Surgery Building at the University of Maryland Medical. Early results based on clinical process mapping and analysis of patient flow bottlenecks demonstrated 100% improvement in delivery of supplies and instruments at surgery start time. This work has been directly applied to the design of the DARPA Trauma Pod research program where robotic surgery will be performed on wounded soldiers on the battlefield.

  13. Considerations in the design of a communication network for an autonomously managed power system

    NASA Technical Reports Server (NTRS)

    Mckee, J. W.; Whitehead, Norma; Lollar, Louis

    1989-01-01

    The considerations involved in designing a communication network for an autonomously managed power system intended for use in space vehicles are examined. An overview of the design and implementation of a communication network implemented in a breadboard power system is presented. An assumption that the monitoring and control devices are distributed but physically close leads to the selection of a multidrop cable communication system. The assumption of a high-quality communication cable in which few messages are lost resulted in a simple recovery procedure consisting of a time out and retransmit process.

  14. Information Flow in the Launch Vehicle Design/Analysis Process

    NASA Technical Reports Server (NTRS)

    Humphries, W. R., Sr.; Holland, W.; Bishop, R.

    1999-01-01

    This paper describes the results of a team effort aimed at defining the information flow between disciplines at the Marshall Space Flight Center (MSFC) engaged in the design of space launch vehicles. The information flow is modeled at a first level and is described using three types of templates: an N x N diagram, discipline flow diagrams, and discipline task descriptions. It is intended to provide engineers with an understanding of the connections between what they do and where it fits in the overall design process of the project. It is also intended to provide design managers with a better understanding of information flow in the launch vehicle design cycle.

  15. A Holistic Approach to Systems Development

    NASA Technical Reports Server (NTRS)

    Wong, Douglas T.

    2008-01-01

    Introduces a Holistic and Iterative Design Process. Continuous process but can be loosely divided into four stages. More effort spent early on in the design. Human-centered and Multidisciplinary. Emphasis on Life-Cycle Cost. Extensive use of modeling, simulation, mockups, human subjects, and proven technologies. Human-centered design doesn t mean the human factors discipline is the most important Disciplines should be involved in the design: Subsystem vendors, configuration management, operations research, manufacturing engineering, simulation/modeling, cost engineering, hardware engineering, software engineering, test and evaluation, human factors, electromagnetic compatibility, integrated logistics support, reliability/maintainability/availability, safety engineering, test equipment, training systems, design-to-cost, life cycle cost, application engineering etc. 9

  16. Minimization In Digital Design As A Meta-Planning Problem

    NASA Astrophysics Data System (ADS)

    Ho, William P. C.; Wu, Jung-Gen

    1987-05-01

    In our model-based expert system for automatic digital system design, we formalize the design process into three sub-processes - compiling high-level behavioral specifications into primitive behavioral operations, grouping primitive operations into behavioral functions, and grouping functions into modules. Consideration of design minimization explicitly controls decision-making in the last two subprocesses. Design minimization, a key task in the automatic design of digital systems, is complicated by the high degree of interaction among the time sequence and content of design decisions. In this paper, we present an AI approach which directly addresses these interactions and their consequences by modeling the minimization prob-lem as a planning problem, and the management of design decision-making as a meta-planning problem.

  17. Natural Resource Information System. Volume 1: Overall description

    NASA Technical Reports Server (NTRS)

    1972-01-01

    A prototype computer-based Natural Resource Information System was designed which could store, process, and display data of maximum usefulness to land management decision making. The system includes graphic input and display, the use of remote sensing as a data source, and it is useful at multiple management levels. A survey established current decision making processes and functions, information requirements, and data collection and processing procedures. The applications of remote sensing data and processing requirements were established. Processing software was constructed and a data base established using high-altitude imagery and map coverage of selected areas of SE Arizona. Finally a demonstration of system processing functions was conducted utilizing material from the data base.

  18. Ergonomics action research II: a framework for integrating HF into work system design.

    PubMed

    Neumann, W P; Village, J

    2012-01-01

    This paper presents a conceptual framework that can support efforts to integrate human factors (HF) into the work system design process, where improved and cost-effective application of HF is possible. The framework advocates strategies of broad stakeholder participation, linking of performance and health goals, and process focussed change tools that can help practitioners engage in improvements to embed HF into a firm's work system design process. Recommended tools include business process mapping of the design process, implementing design criteria, using cognitive mapping to connect to managers' strategic goals, tactical use of training and adopting virtual HF (VHF) tools to support the integration effort. Consistent with organisational change research, the framework provides guidance but does not suggest a strict set of steps. This allows more adaptability for the practitioner who must navigate within a particular organisational context to secure support for embedding HF into the design process for improved operator wellbeing and system performance. There has been little scientific literature about how a practitioner might integrate HF into a company's work system design process. This paper proposes a framework for this effort by presenting a coherent conceptual framework, process tools, design tools and procedural advice that can be adapted for a target organisation.

  19. Adaptive management for soil ecosystem services

    USGS Publications Warehouse

    Birge, Hannah E.; Bevans, Rebecca A.; Allen, Craig R.; Angeler, David G.; Baer, Sara G.; Wall, Diana H.

    2016-01-01

    Ecosystem services provided by soil include regulation of the atmosphere and climate, primary (including agricultural) production, waste processing, decomposition, nutrient conservation, water purification, erosion control, medical resources, pest control, and disease mitigation. The simultaneous production of these multiple services arises from complex interactions among diverse aboveground and belowground communities across multiple scales. When a system is mismanaged, non-linear and persistent losses in ecosystem services can arise. Adaptive management is an approach to management designed to reduce uncertainty as management proceeds. By developing alternative hypotheses, testing these hypotheses and adjusting management in response to outcomes, managers can probe dynamic mechanistic relationships among aboveground and belowground soil system components. In doing so, soil ecosystem services can be preserved and critical ecological thresholds avoided. Here, we present an adaptive management framework designed to reduce uncertainty surrounding the soil system, even when soil ecosystem services production is not the explicit management objective, so that managers can reach their management goals without undermining soil multifunctionality or contributing to an irreversible loss of soil ecosystem services.

  20. Natural Resource Information System. Volume 2: System operating procedures and instructions

    NASA Technical Reports Server (NTRS)

    1972-01-01

    A total computer software system description is provided for the prototype Natural Resource Information System designed to store, process, and display data of maximum usefulness to land management decision making. Program modules are described, as are the computer file design, file updating methods, digitizing process, and paper tape conversion to magnetic tape. Operating instructions for the system, data output, printed output, and graphic output are also discussed.

Top