Price vs. Performance: The Value of Next Generation Fighter Aircraft
2007-03-01
forms. Both the semi-log and log-log forms were plagued with heteroskedasticity (according to the Breusch - Pagan /Cook-Weisberg test ). The RDT&E models...from 1949-present were used to construct two models – one based on procurement costs and one based on research, design, test , and evaluation (RDT&E...fighter aircraft hedonic models include several different categories of variables. Aircraft procurement costs and research, design, test , and
Fiscal Year 2012 United States Air Force Agency Financial Report
2012-01-01
Air Force Research Laboratory (AFRL) and Lawrence Livermore National Laboratory (LLNL) aggressively designed and tested an advanced warhead to...Reaper procurement & RPA capabilities, Light Attack Armed Reconnaissance buys, Joint Strike Fighter, satellites). Research , Development, Test and...Military Personnel Operations, Readiness & Support Procurement Research , Development, Test & Evaluation
Warranties in Weapon System Procurement: An Analysis of Practice and Theory.
1987-04-01
MICROCOPY RESOLUTION TEST CHART NATIONAL BUREAU OF SIANDARDS 1963 A fD r ILE GW cm AD-A190 933 IDA PAPER P-2024 WARRANTIES IN WEAPON SYSTEM PROCUREMENT...EPWT Essential Performance Warranty Test FAR Federal Acquisition Regulation GCS Guidance Control Section GLD Ground Laser Locator Designator GS General...Service IDA Institute for Defense Analyses I&L Installations and Logistics IPT Initial Production Test LDR Laser Designator Rangefimder MLDT Mean
10 CFR 52.99 - Inspection during construction.
Code of Federal Regulations, 2011 CFR
2011-01-01
... license may proceed at its own risk with design and procurement activities, and a licensee may proceed at its own risk with design, procurement, construction, and pre-operational activities, even though the... 10 CFR 50.10(a), whichever is later, its schedule for completing the inspections, tests, or analyses...
10 CFR 52.99 - Inspection during construction.
Code of Federal Regulations, 2012 CFR
2012-01-01
... license may proceed at its own risk with design and procurement activities, and a licensee may proceed at its own risk with design, procurement, construction, and pre-operational activities, even though the... 10 CFR 50.10(a), whichever is later, its schedule for completing the inspections, tests, or analyses...
10 CFR 52.99 - Inspection during construction.
Code of Federal Regulations, 2010 CFR
2010-01-01
... license may proceed at its own risk with design and procurement activities, and a licensee may proceed at its own risk with design, procurement, construction, and pre-operational activities, even though the... 10 CFR 50.10(a), whichever is later, its schedule for completing the inspections, tests, or analyses...
NASA Technical Reports Server (NTRS)
Harris, E. D.
1980-01-01
The Space Test Program Standard Satellite (STPSS), a design proposed by the Air Force, and two NASA candidates, the Applications Explorer Mission spacecraft (AEM) and the Multimission Modular Spacecraft (MMS), were considered during the first phase. During the second phase, a fourth candidate was introduced, a larger, more capable AEM (L-AEM), configured by the Boeing Company under NASA sponsorship to meet the specifications jointly agreed upon by NASA and the Air Force. Total program costs for a variety of procurement options, each of which is capable of performing all of the Air Force Space Test Program missions during the 1980-1990 time period, were used as the principal measure for distinguishing among procurement options. Program cost does not provide a basis for choosing among the AEM, STPSS, and MMS spacecraft, given their present designs. The availability of the L-AEM spacecraft, or some very similar design, would provide a basis for minimizing the cost of the Air Force Space Test Program.
NASA Technical Reports Server (NTRS)
Witkin, S. A.
1976-01-01
Guidelines are presented for a quality assurance system to be implemented by the manufacturer in support of designing, developing, fabricating, assembling, inspecting, testing, handling, and delivery of equipment being procured for use in public urban mass transit systems. The guidelines apply to this equipment when being procured for: (1) use in revenue service; (2) demonstration of systems that will be revenue producing or used by the public; (3) use as a prototype for follow-on operational/revenue producing equipment procurements; and (4) qualification tests.
Standard spacecraft economic analysis. Volume 2: Findings and conclusions
NASA Technical Reports Server (NTRS)
Harris, E. D.; Large, J. P.
1976-01-01
The comparative program costs associated with use of various standardized spacecraft for Air Force space test program missions to be flown on the space shuttle were studied in two phases. In the first phase, a variety of procurement mixes composed of existing or programmed NASA standard spacecraft designs and an Air Force standard spacecraft design were considered. The second phase dealt with additional procurement options using an upgraded version of an existing NASA design. The results of both phases are discussed.
78 FR 46239 - Designations of Chief Acquisition Officer and Senior Procurement Executive
Federal Register 2010, 2011, 2012, 2013, 2014
2013-07-30
... Designations of Chief Acquisition Officer and Senior Procurement Executive and Delegation of Procurement... No. FR-5701-D-01] Designations of Chief Acquisition Officer and Senior Procurement Executive AGENCY... Procurement Officer as the Senior Procurement Executive. DATES: Effective Date: July 24, 2013. FOR FURTHER...
42 CFR 121.9 - Designated transplant program requirements.
Code of Federal Regulations, 2012 CFR
2012-10-01
... RESOURCES DEVELOPMENT ORGAN PROCUREMENT AND TRANSPLANTATION NETWORK § 121.9 Designated transplant program...) Has immediate access to microbiology, clinical chemistry, histocompatibility testing, radiology, and...
42 CFR 121.9 - Designated transplant program requirements.
Code of Federal Regulations, 2014 CFR
2014-10-01
... RESOURCES DEVELOPMENT ORGAN PROCUREMENT AND TRANSPLANTATION NETWORK § 121.9 Designated transplant program...) Has immediate access to microbiology, clinical chemistry, histocompatibility testing, radiology, and...
42 CFR 121.9 - Designated transplant program requirements.
Code of Federal Regulations, 2013 CFR
2013-10-01
... RESOURCES DEVELOPMENT ORGAN PROCUREMENT AND TRANSPLANTATION NETWORK § 121.9 Designated transplant program...) Has immediate access to microbiology, clinical chemistry, histocompatibility testing, radiology, and...
Environmental testing of block 2 solar cell modules
NASA Technical Reports Server (NTRS)
Griffith, J. S.
1979-01-01
The testing procedures and results of samples of the LSA Project Block 2 procurement of silicon solar cell modules are described. Block 2 was the second large scale procurement of silicon solar cell modules made by the JPL Low-cost Solar Array Project with deliveries in 1977 and early 1978. The results showed that the Block 2 modules were greatly improved over Block 1 modules. In several cases it was shown that design improvements were needed to reduce environmental test degradation. These improvements were incorporated during this production run.
78 FR 20783 - Designation of Product Categories for Federal Procurement; Withdrawal
Federal Register 2010, 2011, 2012, 2013, 2014
2013-04-08
... Designation of Product Categories for Federal Procurement; Withdrawal AGENCY: Office of Procurement and.... Department of Agriculture (USDA) is withdrawing the final rule ``Designation of Product Categories for... product categories within which biobased products will be afforded Federal procurement preference, was...
23 CFR 172.5 - Methods of procurement.
Code of Federal Regulations, 2012 CFR
2012-04-01
... ENGINEERING AND DESIGN RELATED SERVICE CONTRACTS § 172.5 Methods of procurement. (a) Procurement. The procurement of Federal-aid highway contracts for engineering and design related services shall be evaluated... negotiation. Contracting agencies shall use competitive negotiation for the procurement of engineering and...
Standard spacecraft economic analysis. Volume 1: Executive summary
NASA Technical Reports Server (NTRS)
Harris, E. D.; Large, J. P.
1976-01-01
A study of the comparative program costs associated with use of various standardized spacecraft for Air Force space test program missions to be flown on the space shuttle during the 1980-1990 time period is reviewed. The first phase of the study considered a variety of procurement mixes composed of existing or programmed NASA standard spacecraft designs and a Air Force standard spacecraft design. The results were briefed to a joint NASA/Air Force audience on July 11, 1976. The second phase considered additional procurement options using an upgraded version of an existing NASA design. The results of both phases are summarized.
SIRTF primary mirror design, analysis, and testing
NASA Technical Reports Server (NTRS)
Sarver, George L., III; Maa, Scott; Chang, LI
1990-01-01
The primary mirror assembly (PMA) requirements and concepts for the Space Infrared Telescope Facility (SIRTF) program are discussed. The PMA studies at NASA/ARC resulted in the design of two engineering test articles, the development of a mirror mount cryogenic static load testing system, and the procurement and partial testing of a full scale spherical mirror mounting system. Preliminary analysis and testing of the single arch mirror with conical mount design and the structured mirror with the spherical mount design indicate that the designs will meet all figure and environmental requirements of the SIRTF program.
23 CFR 172.5 - Methods of procurement.
Code of Federal Regulations, 2010 CFR
2010-04-01
... proposal solicitation (project, task, or service) process shall be by public announcement, advertisement... ENGINEERING AND DESIGN RELATED SERVICE CONTRACTS § 172.5 Methods of procurement. (a) Procurement. The procurement of Federal-aid highway contracts for engineering and design related services shall be evaluated...
77 FR 53802 - Procurement, Management, and Administration of Engineering and Design Related Services
Federal Register 2010, 2011, 2012, 2013, 2014
2012-09-04
...-2012-0043] RIN 2125-AF44 Procurement, Management, and Administration of Engineering and Design Related... regulations governing the procurement, management, and administration of engineering and design related... . Background The FHWA proposes to modify existing regulations for the administration of engineering and design...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-05-23
... 2.0 program would proceed through 2020 with design, construction, operation, and monitoring... of this test includes project definition, design, procurement, manufacture, installation, startup... the repowered oxy-combustion design. The station contains existing infrastructure that could support...
Sealed-cell nickel-cadmium battery applications manual
NASA Technical Reports Server (NTRS)
Scott, W. R.; Rusta, D. W.
1979-01-01
The design, procurement, testing, and application of aerospace quality, hermetically sealed nickel-cadmium cells and batteries are presented. Cell technology, cell and battery development, and spacecraft applications are emphasized. Long term performance is discussed in terms of the effect of initial design, process, and application variables. Design guidelines and practices are given.
Tank farms pump critical characteristic and specification guide
DOE Office of Scientific and Technical Information (OSTI.GOV)
Titzler, P.A.
The Design Authority group for Tank Farms, in conjunction with the Construction Projects organization, have recognized that there is a need to provide consistency in the procurement and testing of pumps and to assure that known critical attributes and features are included with each pump order as well as to reduce potential confusion by pump suppliers. As a result, a panel of pump experts representing Lockheed Martin Hanford Company (LMHC), Fluor Daniel Northwest (FDNW), Numatec Hanford Corporation (NHC), SGN Eurisys Services Corporation (SESC), and ARES Corporation has been assembled to prepare a guide for pump specifications. This document contains themore » consensus listing of critical characteristics and procurement recommendations of the panel. It is intended to be used as a guide for future pump procurement activities. If followed, it will help reduce cleanup costs at the Hanford Site and promote prompt approval of pumping system designs and procurement specifications. Alternate criteria may be specified on a case by case basis if deviation from the requirements contained herein is merited due to special circumstances.« less
NASA Technical Reports Server (NTRS)
Gonzalez, Guillermo A.; Lucy, Melvin H.; Massie, Jeffrey J.
2013-01-01
The NASA Langley Research Center, Engineering Directorate, Electronic System Branch, is responsible for providing pyrotechnic support capabilities to Langley Research Center unmanned flight and ground test projects. These capabilities include device selection, procurement, testing, problem solving, firing system design, fabrication and testing; ground support equipment design, fabrication and testing; checkout procedures and procedure?s training to pyro technicians. This technical memorandum will serve as a guideline for the design, fabrication and testing of electropyrotechnic firing systems. The guidelines will discuss the entire process beginning with requirements definition and ending with development and execution.
NASA Technical Reports Server (NTRS)
Popp, Christopher G.; Cook, Joseph C.; Ragland, Brenda L.; Pate, Leah R.
1992-01-01
In support of propulsion system thruster development activity for Space Station Freedom (SSF), NASA Johnson Space Center (JSC) conducted a hydrazine thruster technology demonstration program. The goal of this program was to identify impulse life capability of state-of-the-art long life hydrazine thrusters nominally rated for 50 pounds thrust at 300 psia supply pressure. The SSF propulsion system requirement for impulse life of this thruster class is 1.5 million pounds-seconds, corresponding to a throughput of approximately 6400 pounds of propellant. Long life thrusters were procured from The Marquardt Company, Hamilton Standard, and Rocket Research Company, Testing at JSC was completed on the thruster designs to quantify life while simulating expected thruster firing duty cycles and durations for SSF. This paper presents a review of the SSF propulsion system hydrazine thruster requirements, summaries of the three long life thruster designs procured by JSC and acceptance test results for each thruster, the JSC thruster life evaluation test program, and the results of the JSC test program.
Hanford spent nuclear fuel hot conditioning system test procedure
DOE Office of Scientific and Technical Information (OSTI.GOV)
Cleveland, K.J.
1997-09-16
This document provides the test procedures for cold testing of the prototype Hot Conditioning System (HCS) at the 306E Facility. The primary objective of this testing is to confirm design choices and provide data for the detailed design package prior to procurement of the process equipment. The current scope of testing in this document includes a fabricability study of the HCS, equipment performance testing of the HCS components, heat-up and cool-down cycle simulation, and robotic arm testing.
NASA Astrophysics Data System (ADS)
Schoolderman, Arnold J.; Roosenboom, Jacques H. J.
2005-06-01
The Engineers Centre of Expertise of the Royal Netherlands Army (RNLA) has conducted a study on countermine in peace operations. This study, finished in 2002, concluded that the final solution to countermine will depend in the first place on better detection of buried low-metal mines, e.g. by direct detection of the explosive components in mines. Until such detection systems are available, intermediate solutions are necessary in order to assure freedom of movement in peace operations. Because countermine operations consist of a number of different activities (area preparation, detection, clearance, etc) and the suitability of the different types of available equipment depends on the scenario, the toolbox concept for countermine equipment was adopted. In 2003 a procurement process was started in order to fill this toolbox with commercial-off-the-shelf and military-off-the-shelf equipment. The paper gives a concise description of the study on countermine operations and the procurement process, and subsequently focuses on the set-up of the tests that were conducted in the framework of the procurement of hand-held mine detection systems, like metal detectors and dual-sensor mine detectors. Programs of requirements for these systems were drawn up, aiming at systems for general use and special purpose systems. Blind tests to check the compliancy to the detection performance requirements were designed and conducted in the short timeframe that was available in the procurement process. These tests are discussed in this paper, including the set-up of the test lanes, the targets used and their depths, and the role of the operator. The tests of the capability of the detectors to discriminate small targets adjacent to large targets were conducted according the guidelines of the CEN Workshop Agreement on metal detector tests. Although the results of the tests are commercially confidential, conclusions and lessons learned from the execution of these tests are presented.
QA program plan plutonium stabilization and handling project W-460
DOE Office of Scientific and Technical Information (OSTI.GOV)
SCHULTZ, J.W.
This Quality Assurance Program Plan (QAPP) identifies Project Quality Assurance (QA) program requirements for all parties participating in the design, procurement, demolition, construction, installation, inspection and testing for Project W-460.
Toward a Framework for Dynamic Service Binding in E-Procurement
NASA Astrophysics Data System (ADS)
Ashoori, Maryam; Eze, Benjamin; Benyoucef, Morad; Peyton, Liam
In an online environment, an E-Procurement process should be able to react and adapt in near real-time to changes in suppliers, requirements, and regulations. WS-BPEL is an emerging standard for process automation, but is oriented towards design-time binding of services. This missing issue can be resolved through designing an extension to WS-BPEL to support automation of flexible e-Procurement processes. Our proposed framework will support dynamic acquisition of procurement services from different suppliers dealing with changing procurement requirements. The proposed framework is illustrated by applying it to health care where different health insurance providers could be involved to procure the medication for patients.
44 CFR 150.6 - Design and procurement of awards.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 44 Emergency Management and Assistance 1 2013-10-01 2013-10-01 false Design and procurement of awards. 150.6 Section 150.6 Emergency Management and Assistance FEDERAL EMERGENCY MANAGEMENT AGENCY, DEPARTMENT OF HOMELAND SECURITY FIRE PREVENTION AND CONTROL PUBLIC SAFETY AWARDS TO PUBLIC SAFETY OFFICERS § 150.6 Design and procurement of awards. (a...
44 CFR 150.6 - Design and procurement of awards.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 44 Emergency Management and Assistance 1 2011-10-01 2011-10-01 false Design and procurement of awards. 150.6 Section 150.6 Emergency Management and Assistance FEDERAL EMERGENCY MANAGEMENT AGENCY, DEPARTMENT OF HOMELAND SECURITY FIRE PREVENTION AND CONTROL PUBLIC SAFETY AWARDS TO PUBLIC SAFETY OFFICERS § 150.6 Design and procurement of awards. (a...
44 CFR 150.6 - Design and procurement of awards.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 44 Emergency Management and Assistance 1 2010-10-01 2010-10-01 false Design and procurement of awards. 150.6 Section 150.6 Emergency Management and Assistance FEDERAL EMERGENCY MANAGEMENT AGENCY, DEPARTMENT OF HOMELAND SECURITY FIRE PREVENTION AND CONTROL PUBLIC SAFETY AWARDS TO PUBLIC SAFETY OFFICERS § 150.6 Design and procurement of awards. (a...
National Ignition Facility project acquisition plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
Callaghan, R.W.
The purpose of this National Ignition Facility Acquisition Plan is to describe the overall procurement strategy planned for the National Ignition Facility (NIF) Project. The scope of the plan describes the procurement activities and acquisition strategy for the following phases of the NIF Project, each of which receives either plant and capital equipment (PACE) or other project cost (OPC) funds: Title 1 and 2 design and Title 3 engineering (PACE); Optics manufacturing facilitization and pilot production (OPC); Convention facility construction (PACE); Procurement, installation, and acceptance testing of equipment (PACE); and Start-up (OPC). Activities that are part of the base Inertialmore » Confinement Fusion (ICF) Program are not included in this plan. The University of California (UC), operating Lawrence Livermore National Laboratory (LLNL) and Los Alamos National Laboratory, and Lockheed-Martin, which operates Sandia National Laboratory (SNL) and the University of Rochester Laboratory for Laser Energetics (UR-LLE), will conduct the acquisition of needed products and services in support of their assigned responsibilities within the NIF Project structure in accordance with their prime contracts with the Department of Energy (DOE). LLNL, designated as the lead Laboratory, will have responsibility for all procurements required for construction, installation, activation, and startup of the NIF.« less
Federal Register 2010, 2011, 2012, 2013, 2014
2010-06-11
... Organization Government Procurement Agreement. DATES: Effective date: June 11, 2010. FOR FURTHER INFORMATION..., Taiwan became a designated country under the World Trade Organization Government Procurement Agreement... World Trade Organization Government Procurement Agreement countries in the trade agreement provisions...
76 FR 56883 - Designation of Product Categories for Federal Procurement
Federal Register 2010, 2011, 2012, 2013, 2014
2011-09-14
... and should document exceptions taken for price, performance, and availability. USDA recognizes that...) requires USDA to provide information to procuring agencies on the availability, relative price, performance... a product designated by EPA generally to procure such a product composed of the highest percentage...
A normal incidence, high resolution X-ray telescope for solar coronal observations
NASA Technical Reports Server (NTRS)
Golub, L.
1984-01-01
Efforts directed toward the completion of an X-ray telescope assembly design, the procurement of major components, and the coordination of optical fabrication and X-ray multilayer testing are reported.
10 CFR 52.99 - Inspection during construction; ITAAC schedules and notifications; NRC notices.
Code of Federal Regulations, 2014 CFR
2014-01-01
...; ITAAC schedules and notifications; NRC notices. (a) Licensee schedule for completing inspections, tests... schedule for completing the inspections, tests, or analyses in the ITAAC. The licensee shall submit updates... combined license may proceed at its own risk with design and procurement activities, and a licensee may...
10 CFR 52.99 - Inspection during construction; ITAAC schedules and notifications; NRC notices.
Code of Federal Regulations, 2013 CFR
2013-01-01
...; ITAAC schedules and notifications; NRC notices. (a) Licensee schedule for completing inspections, tests... schedule for completing the inspections, tests, or analyses in the ITAAC. The licensee shall submit updates... combined license may proceed at its own risk with design and procurement activities, and a licensee may...
78 FR 34867 - Designation of Product Categories for Federal Procurement
Federal Register 2010, 2011, 2012, 2013, 2014
2013-06-11
... products for which USDA has biobased content test data. Because the submission of product samples for... certification to use the USDA Certified Biobased Product label. These test results are also considered when.... Outreach. To augment its own research, USDA consults with industry and Federal stakeholders to the...
78 FR 19393 - Designation of Product Categories for Federal Procurement
Federal Register 2010, 2011, 2012, 2013, 2014
2013-04-01
... products for which USDA has biobased content test data. Because the submission of product samples for... certification to use the USDA Certified Biobased Product label. These test results are also considered when.... Outreach. To augment its own research, USDA consults with industry and Federal stakeholders to the...
NASA Technical Reports Server (NTRS)
Webb, Andrew T.
1998-01-01
The paper describes the unique pneumatic test requirements for the acoustic and shock separation testing of the Second Stage for the new Delta III Rocket at the Goddard Space Flight Center in Greenbelt, Maryland. The testing was conducted in the 45,000 cu ft (25-feet wide by 30-feet deep by 50-foot high) Acoustic Facility. The acoustic testing required that the liquid oxygen (LOX) and liquid hydrogen (LH2) tanks be filled with enough liquid nitrogen (LN2) to simulate launch fuel masses during testing. The challenge for this test dealt with designing, procuring, and fabricating the pneumatic supply systems for quick assembly while maintaining the purity requirements and minimizing costs. The pneumatic systems were designed to fill and drain the both LOX and LH2 tanks as well as to operate the fill/drain and vent valves for each of the tanks. The test criteria for the pneumatic sub-systems consisted of function, cleanliness, availability, and cost. The first criteria, function, required the tanks to be filled and drained in an efficient manner while preventing them from seeing pressures greater than 9 psig which would add a pressure cycle to the tank. An LN2 tanker, borrowed from another NASA facility, served as the pre-cool and drain tanker. Pre-cooling the tanks allowed for more efficient and cost effective transfer from the LN2 delivery tankers. Helium gas, supplied from a high purity tube trailer, was used to pressurize the vapor space above the LN2 pushing it into the drain tanker. The tube trailer also supplied high pressure helium to the vehicle for valve control and component purges. Cleanliness was maintained by proper component selection, end-use particle filtration, and any on-site cleaning determined necessary by testing. In order to meet the availability/cost juggling act, products designed for LOX delivery systems were procured to ensure system compatibility while off the shelf valves and tubing designed for the semiconductor industry were procured for the gas systems.
76 FR 53113 - Guidelines for Designating Biobased Products for Federal Procurement
Federal Register 2010, 2011, 2012, 2013, 2014
2011-08-25
.... Information regarding the Federal biobased preferred procurement program (one part of the BioPreferred Program... Request: Extension of a currently approved information collection. Abstract: The USDA BioPreferred Program... that then permit USDA to designate items for preferred procurement under the BioPreferred Program. Once...
48 CFR 2401.601-70 - Senior Procurement Executive.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Senior Procurement... Authority, and Responsibilities 2401.601-70 Senior Procurement Executive. Unless otherwise designated by the Secretary through a delegation of authority, the Chief Procurement Officer is the Department's Senior...
Status of the Perpendicular Biased 2nd Harmonic Cavity for the Fermilab Booster
Tan, C. Y.; Dey, J. E.; Duel, K. L.; ...
2017-05-01
This is a status report on the 2nd harmonic cavity for the Fermilab Booster as part of the Proton Improvement Plan (PIP) for increasing beam transmission efficiency, and thus reducing losses. A set of tuner rings has been procured and is undergoing quality control tests. The Y567 tube for driving the cavity has been successfully tested at both injection and extraction frequencies. A cooling scheme for the tuner and cavity has been developed after a thorough thermal analysis of the system. RF windows have been procured and substantial progress has been made on the mechanical designs of the cavity andmore » the bias solenoid. Finally, the goal is to have a prototype cavity ready for testing by the end of 2017.« less
Status of the Perpendicular Biased 2nd Harmonic Cavity for the Fermilab Booster
DOE Office of Scientific and Technical Information (OSTI.GOV)
Tan, C. Y.; Dey, J. E.; Duel, K. L.
This is a status report on the 2nd harmonic cavity for the Fermilab Booster as part of the Proton Improvement Plan (PIP) for increasing beam transmission efficiency, and thus reducing losses. A set of tuner rings has been procured and is undergoing quality control tests. The Y567 tube for driving the cavity has been successfully tested at both injection and extraction frequencies. A cooling scheme for the tuner and cavity has been developed after a thorough thermal analysis of the system. RF windows have been procured and substantial progress has been made on the mechanical designs of the cavity andmore » the bias solenoid. Finally, the goal is to have a prototype cavity ready for testing by the end of 2017.« less
Surface electrical properties experiment study phase, volume 3
NASA Technical Reports Server (NTRS)
1973-01-01
The reliability and quality assurance system and procedures used in developing test equipment for the Lunar Experiment projects are described. The subjects discussed include the following: (1) documentation control, (2) design review, (3) parts and materials selection, (4) material procurement, (5) inspection procedures, (6) qualification and special testing, and failure modes and effects analysis.
Proceedings: 1990 EPRI gas turbine procurement seminar
DOE Office of Scientific and Technical Information (OSTI.GOV)
McDonald, B.L.; Miller, M.N.
1991-06-01
This seminar presents information that enables utilities to implement more cost-effective procurements for gas turbine and combined-cycle power generation equipment. A systematic approach to specification and permitting procedures can lower unit life-cycle cost. APPROACH. Thirty-two staff members from 25 utilities met in Danvers, Massachusetts, October 9--11, 1990. Speakers representing utilities, vendors, and EPRI contractors presented material on recent procurement and startup experiences, permitting considerations, specification strategy, bid evaluation techniques, and a vendor's perspective of utility procurements. KEY POINTS. The seminar focused on specification features, procurement procedures, and bid evaluation techniques designed to implement life-cycle cost-effective procurement consistent with the plantmore » mission. Speakers highlighted the following issues: Experiential case histories of recent procurements and startups, emphasizing how to design procurement procedures that improve plant operating economics; Current trends in permitting for NO{sub x} compliance and recent permitting experience; Quantifiable evaluations of vendors' bids for RAM-related characteristics; The means to obtain specifically desired but nonstandard equipment features.« less
Space shuttle main engine controller assembly, phase C-D. [with lagging system design and analysis
NASA Technical Reports Server (NTRS)
1973-01-01
System design and system analysis and simulation are slightly behind schedule, while design verification testing has improved. Input/output circuit design has improved, but digital computer unit (DCU) and mechanical design continue to lag. Part procurement was impacted by delays in printed circuit board, assembly drawing releases. These are the result of problems in generating suitable printed circuit artwork for the very complex and high density multilayer boards.
13 CFR 305.6 - Allowable methods of procurement for construction services.
Code of Federal Regulations, 2010 CFR
2010-01-01
... Approved Projects § 305.6 Allowable methods of procurement for construction services. (a) Recipients may use alternate construction procurement methods to the traditional design/bid/build procedures... 13 Business Credit and Assistance 1 2010-01-01 2010-01-01 false Allowable methods of procurement...
Hospital-based expert model for health technology procurement planning in hospitals.
Miniati, R; Cecconi, G; Frosini, F; Dori, F; Regolini, J; Iadanza, E; Biffi Gentili, G
2014-01-01
Although in the last years technology innovation in healthcare brought big improvements in care level and patient quality of life, hospital complexity and management cost became higher. For this reason, necessity of planning for medical equipment procurement within hospitals is getting more and more important in order to sustainable provide appropriate technology for both routine activity and innovative procedures. In order to support hospital decision makers for technology procurement planning, an expert model was designed as reported in the following paper. It combines the most widely used approaches for technology evaluation by taking into consideration Health Technology Assessment (HTA) and Medical Equipment Replacement Model (MERM). The designing phases include a first definition of prioritization algorithms, then the weighting process through experts' interviews and a final step for the model validation that included both statistical testing and comparison with real decisions. In conclusion, the designed model was able to provide a semi-automated tool that through the use of multidisciplinary information is able to prioritize different requests of technology acquisition in hospitals. Validation outcomes improved the model accuracy and created different "user profiles" according to the specific needs of decision makers.
41 CFR 101-26.501-3 - Consolidated purchase program.
Code of Federal Regulations, 2010 CFR
2010-07-01
... Management Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS SUPPLY AND PROCUREMENT 26-PROCUREMENT..., purchased in the aggregate by group to the extent practical. These procurements are designed to obtain the...
Cell module and fuel conditioner
NASA Technical Reports Server (NTRS)
Hoover, D. Q., Jr.
1980-01-01
Measurements of stack height changes with temperature and cell material characteristics were made. Stack 559 was assembled and components were fabricated for 560, 561, and 562. Stack 425 was transferred from the parallel DOE program and installed in the OS/IES simulation loop for mechanical and electrical testing. Construction and preliminary checkout of the 2 kW test facility was completed and design and procurement of the 8 kW test facility was initiated. The fuel conditioning subsystem design continued to evolve and the state points for the current design were calculated at full and part load conditions. Steam reforming catalyst activity tests were essentially completed and aging tests and CO shift converter tests were initiated.
17 CFR 200.13 - Executive Director.
Code of Federal Regulations, 2010 CFR
2010-04-01
... AND ETHICS; AND INFORMATION AND REQUESTS Organization and Program Management General Organization... procurement regulations, enters into contracts, designates contracting officers, and makes procurement...-specific application of performance measures, procurement reforms, personnel reductions, financial...
Acquisition-Management Program
NASA Technical Reports Server (NTRS)
Avery, Don E.; Vann, A. Vernon; Jones, Richard H.; Rew, William E.
1987-01-01
NASA Acquisition Management Subsystem (AMS) program integrated NASA-wide standard automated-procurement-system program developed in 1985. Designed to provide each NASA installation with procurement data-base concept with on-line terminals for managing, tracking, reporting, and controlling contractual actions and associated procurement data. Subsystem provides control, status, and reporting for various procurement areas. Purpose of standardization is to decrease costs of procurement and operation of automatic data processing; increases procurement productivity; furnishes accurate, on-line management information and improves customer support. Written in the ADABAS NATURAL.
Wafula, Francis; Agweyu, Ambrose; Macintyre, Kate
2014-04-01
Nearly 40% of Global Fund money goes toward procurement. However, no analyses have been published to show how costs vary across regions and time, despite the availability of procurement data collected through the Global Fund's price and quality reporting system. We analyzed data for the 3 most widely procured commodities for the prevention, diagnosis, and treatment of HIV. These were male condoms, HIV rapid tests, and the antiretroviral (ARV) combination of lamivudine/nevirapine/zidovudine. The compared costs, first across time (2005-2012), then across regions, and finally, between individual procurement reported through the price and quality reporting and pooled procurement reported through the Global Fund's voluntary pooled procurement system. All costs were adjusted for inflation and reported in US dollars. There were 2337 entries from 578 grants in 125 countries. The procurement cost for the ARV dropped substantially over the period, whereas those for condoms and HIV tests remained relatively stable. None of the commodity prices increased. Regional variations were pronounced for HIV tests, but minimal for condoms and the ARV. The unit cost for the 3-table ARV combination, for instance, varied between US$0.15 and US$0.23 in South Asia and the Eastern Europe/Central Asia regions, respectively, compared with a range of $0.23 (South Asia)-$1.50 (Eastern Europe/Central Asia) for a single diagnostic test. Pooled procurement lowered costs for condoms but not the other commodities. We showed how global procurement costs vary by region and time. Such analyses should be done more often to identify and correct market insufficiencies.
Greening Operations Management: An Online Sustainable Procurement Course for Practitioners
ERIC Educational Resources Information Center
Walker, Helen L.; Gough, Stephen; Bakker, Elmer F.; Knight, Louise A.; McBain, Darian
2009-01-01
In the Operations Management field, sustainable procurement has emerged as a way to green the purchasing and supply process. This paper explores issues in sustainable procurement training. The authors formed an interdisciplinary team to design, deliver and evaluate a training programme to promote and develop sustainable procurement in the United…
75 FR 6795 - Designation of Biobased Items for Federal Procurement
Federal Register 2010, 2011, 2012, 2013, 2014
2010-02-10
...The U.S. Department of Agriculture (USDA) is proposing to amend the Guidelines for Designating Biobased Products for Federal Procurement (Guidelines) to add nine sections that will designate the following items within which biobased products would be afforded Federal procurement preference: Disposable tableware; expanded polystyrene foam recycling products; heat transfer fluids; ink removers and cleaners; mulch and compost materials; multipurpose lubricants; office paper; topical pain relief products; and turbine drip oils. USDA is also proposing minimum biobased contents for each of these items.
1982-02-01
STINGER missiles and ground support equipment. The program for FY 1983 represents the sixth year of a planned eleven-year procurement effort designed ...planned eleven year procurement effort designed t., fill the Army’s inventory objective. The STINER, scheduled to replace the obsolete RED-YI, has greater...equipment. This is the fifth year of procurement designed to fill the Army inventory objective. MIRES is a self-propelled, fast- reacting, multiple rocket
78 FR 41694 - Final Priority and Requirements; Education Facilities Clearinghouse
Federal Register 2010, 2011, 2012, 2013, 2014
2013-07-11
... the collection and dissemination of best practices for the planning, design, financing, procurement... Facilities Clearinghouse program is to provide technical assistance and training on the planning, design... dissemination of best practices for the planning, design, financing, procurement, construction, improvement...
Making the Case for a Model-Based Definition of Engineering Materials (Postprint)
2017-09-12
MBE relies on digi- tal representations, or a model-based definition (MBD), to define a product throughout design , manufacturing and sus- tainment...discovery through development, scale-up, product design and qualification, manufacture and sustainment have changed little over the past decades. This...testing data provided a certifiable material definition, so as to minimize risk and simplify procurement of materials during the design , manufacture , and
Long life monopropellant hydrazine thruster evaluation for Space Station Freedom application
NASA Technical Reports Server (NTRS)
Popp, Christopher G.; Henderson, John B.
1991-01-01
In support of propulsion system thruster development activity for Space Station Freedom (SSF), NASA Johnson Space Center (JSC) is conducting a hydrazine thruster technology demonstration program. The goal of this program is to identify impulse life capability of state-of-the-art long life hydrazine thrusters nominally rated for 50 pounds thrust at 300 psia supply pressure. The SSF propulsion system requirement for impulse life of this thruster class is 1.5 million pound-seconds, corresponding to a throughput of approximately 6400 pounds of propellant, with a high performance (234 pound-seconds per propellant pound). Long life thrusters were procured from Hamilton Standard, The Marquardt Company, and Rocket Research Company. Testing has initiated on the thruster designs to identify life while simulating expected thruster firing duty cycles and durations for SSF using monopropellant grade hydrazine. This paper presents a review of the SSF propulsion system and requirements as applicable to hydrazine thrusters, the three long life thruster designs procured by JSC and the resultant acceptance test data for each thruster, and the JSC test plan and facility.
NASA Handbook for Nickel-Hydrogen Batteries
NASA Technical Reports Server (NTRS)
Dunlop, James D.; Gopalakrishna, M. Rao; Yi, Thomas Y.
1993-01-01
Nickel-hydrogen (NiH2) batteries are finding more applications in the aerospace energy storage. Since 1983, NiH2 batteries have become the primary energy storage system used for Geosynchronous-Orbit (GEO) Satellites. The first NASA application for NiH2 batteries was the Low Earth Orbit (LEO) Hubble Space Telescope Satellite launched in 1990. The handbook was prepared as a reference book to aid in the application of this technology. That is, to aid in the cell and battery design, procurement, testing, and handling of NiH2 batteries. The design of individual pressure vessel NiH2 cells is covered in Chapter l. LEO and GEO applications and their requirements are discussed in Chapter 2. The design of NiH2 batteries for both GEO and LEO applications is discussed in Chapter 3. Advanced design concepts such as the common pressure vessel and bipolar NiH2 batteries are described in Chapter 4. Performance data are presented in Chapter 5. Storage and handling of the NiH2 cells and batteries are discussed in Chapter 6. Standard test procedures are presented in Chapter 7. Cell and battery procurements are discussed in Chapter 8. Finally, safety procedures are discussed in Chapter 9.
Design and engineering analysis of material procurement mobile operation platform
NASA Astrophysics Data System (ADS)
Ding, H.; Li, J.
2014-03-01
The material procurement mobile operation platform (MPMOP) consists of six modules, including network operation, truck transportation, remote communication, satellite positioning, power supply and environment regulation. The MPMOP is designed to have six major functions, including online procurement, command control, remote communication, satellite positioning, information management and auxiliary decision. The paper implements an engineering analysis on the MPMOP from three aspects, including transportation transfinite, centroid, and power dissipation.
Design review report for the SY-101 RAPID mitigation system
DOE Office of Scientific and Technical Information (OSTI.GOV)
SCHLOSSER, R.L.
1999-05-24
This report documents design reviews conducted of the SY-101 Respond And Pump In Days (RAPID) Mitigation System. As part of the SY-101 Surface-Level-Rise Remediation Project, the SY-101 WID Mitigation System will reduce the potential unacceptable consequences of crust growth in Tank 241-SY-101 (SY-101). Projections of the crust growth rate indicate that the waste level in the tank may reach the juncture of the primary and secondary confinement structures of the tank late in 1999. Because of this time constraint, many design activities are being conducted in parallel and design reviews were conducted for system adequacy as well as design implementationmore » throughout the process. Design implementation, as used in this design review report, is the final component selection (e.g., which circuit breaker, valve, or thermocouple) that meets the approved design requirements, system design, and design and procurement specifications. Design implementation includes the necessary analysis, testing, verification, and qualification to demonstrate compliance with the system design and design requirements. Design implementation is outside the scope of this design review. The design activities performed prior to detailed design implementation (i.e., system mission requirements, functional design requirements, technical criteria, system conceptual design, and where design and build contracts were placed, the procurement specification) have been reviewed and are within the scope of this design review report. Detailed design implementation will be controlled, reviewed, and where appropriate, approved in accordance with Tank Waste Remediation System (TWRS) engineering procedures. Review of detailed design implementation will continue until all components necessary to perform the transfer function are installed and tested.« less
SMEX-Lite Modular Solar Array Architecture
NASA Technical Reports Server (NTRS)
Lyons, John W.; Day, John (Technical Monitor)
2002-01-01
The NASA Small Explorer (SMEX) missions have typically had three years between mission definition and launch. This short schedule has posed significant challenges with respect to solar array design and procurement. Typically, the solar panel geometry is frozen prior to going out with a procurement. However, with the SMEX schedule, it has been virtually impossible to freeze the geometry in time to avoid scheduling problems with integrating the solar panels to the spacecraft. A modular solar array architecture was developed to alleviate this problem. This approach involves procuring sufficient modules for multiple missions and assembling the modules onto a solar array framework that is unique to each mission. The modular approach removes the solar array from the critical path of the SMEX integration and testing schedule. It also reduces the cost per unit area of the solar arrays and facilitates the inclusion of experiments involving new solar cell or panel technologies in the SMEX missions.
75 FR 63695 - Designation of Biobased Items for Federal Procurement
Federal Register 2010, 2011, 2012, 2013, 2014
2010-10-18
... manufacturing in rural communities; and to enhance the Nation's energy security by substituting biobased... items used in products or systems designed or procured for combat or combat-related missions, which will... least part of its environmental information responsibilities. The BEES tool is designed to evaluate...
Development and fabrication of a solar cell junction processing system
NASA Technical Reports Server (NTRS)
Kiesling, R.
1981-01-01
The major component fabrication program was completed. Assembly and system testing of the pulsed electron beam annealing machine are described. The design program for the transport reached completion, and the detailed drawings were released for fabrication and procurement of the long lead time components.
NASA Technical Reports Server (NTRS)
1980-01-01
Project planning data for a rotor and control system procurement and testing program for modifications to the XV-15 tilt-rotor research demonstrator aircraft is presented. The design, fabrication, and installation of advanced composite blades compatible with the existing hub, an advanced composite hub, and a nonmechanical control system are required.
Incardona, Sandra; Serra-Casas, Elisa; Champouillon, Nora; Nsanzabana, Christian; Cunningham, Jane; González, Iveth J
2017-05-15
Malaria rapid diagnostic tests (RDTs) play a critical role in malaria case management, and assurance of quality is a key factor to promote good adherence to test results. Since 2007, the World Health Organization (WHO) and the Foundation for Innovative New Diagnostics (FIND) have coordinated a Malaria RDT Evaluation Programme, comprising a pre-purchase performance evaluation (product testing, PT) and a pre-distribution quality control of lots (lot testing, LT), the former being the basis of WHO recommendations for RDT procurement. Comprehensive information on malaria RDTs sold worldwide based on manufacturers' data and linked to independent performance data is currently not available, and detailed knowledge of procurement practices remains limited. The use of the PT/LT Programme results as well as procurement and lot verification practices were assessed through a large-scale survey, gathering product-specific RDT sales and procurement data (2011-14 period) from a total of 32 manufacturers, 12 procurers and 68 National Malaria Control Programmes (NMCPs). Manufacturers' reports showed that RDT sales had more than doubled over the four years, and confirmed a trend towards increased compliance with the WHO procurement criteria (from 83% in 2011 to 93% in 2014). Country-level reports indicated that 74% of NMCPs procured only 'WHO-compliant' RDT products, although procurers' transactions datasets revealed a surprisingly frequent overlap of different products and even product types (e.g., Plasmodium falciparum-only and Plasmodium-pan) in the same year and country (60 and 46% of countries, respectively). Importantly, the proportion of 'non-complying' (i.e., PT low scored or not evaluated) products was found to be higher in the private health care sector than in the public sector (32% vs 5%), and increasing over time (from 22% of private sector sales in 2011 to 39% in 2014). An estimated 70% of the RDT market was covered by the LT programme. The opinion about the PT/LT Programmes was positive overall, and quality of RDTs as per the PT Programme was rated as the number one procurement criteria. This survey provided in-depth information on RDT sales and procurement dynamics, including the largely unstudied private sector, and demonstrated how the WHO-FIND Programme has positively influenced procurement practices in the public sector.
Novel cyclone empirical pressure drop and emissions with heterogeneous particulate
USDA-ARS?s Scientific Manuscript database
New cyclone designs equally effective at controlling emissions that have smaller pressure losses would reduce both the financial and the environmental cost of procuring electricity. Tests were conducted with novel and industry standard 30.5 cm diameter cyclones at inlet velocities from 8 to 18 m s-...
7 CFR 1728.70 - Procurement of materials.
Code of Federal Regulations, 2014 CFR
2014-01-01
... unlisted item in emergency situations and for experimental use or to meet a specific need. For purposes of... from the industry is not readily available, or the standard designs are not applicable to the borrower's specific problem under consideration. (3) RUS will make arrangements for test or experimental use...
7 CFR 1728.70 - Procurement of materials.
Code of Federal Regulations, 2012 CFR
2012-01-01
... unlisted item in emergency situations and for experimental use or to meet a specific need. For purposes of... from the industry is not readily available, or the standard designs are not applicable to the borrower's specific problem under consideration. (3) RUS will make arrangements for test or experimental use...
7 CFR 1728.70 - Procurement of materials.
Code of Federal Regulations, 2010 CFR
2010-01-01
... unlisted item in emergency situations and for experimental use or to meet a specific need. For purposes of... from the industry is not readily available, or the standard designs are not applicable to the borrower's specific problem under consideration. (3) RUS will make arrangements for test or experimental use...
7 CFR 1728.70 - Procurement of materials.
Code of Federal Regulations, 2013 CFR
2013-01-01
... unlisted item in emergency situations and for experimental use or to meet a specific need. For purposes of... from the industry is not readily available, or the standard designs are not applicable to the borrower's specific problem under consideration. (3) RUS will make arrangements for test or experimental use...
7 CFR 1728.70 - Procurement of materials.
Code of Federal Regulations, 2011 CFR
2011-01-01
... unlisted item in emergency situations and for experimental use or to meet a specific need. For purposes of... from the industry is not readily available, or the standard designs are not applicable to the borrower's specific problem under consideration. (3) RUS will make arrangements for test or experimental use...
Procurement engineering - the productivity factor
DOE Office of Scientific and Technical Information (OSTI.GOV)
Bargerstock, S.B.
1993-01-01
The industry is several years on the road to implementation of the Nuclear Management and Resources Council (NUMARC) initiatives on commercial-grade item dedication and procurement. Utilities have taken several approaches to involve engineering in the procurement process. A common result for the approaches is the additional operations and maintenance (O M) cost imposed by the added resource requirements. Procurement engineering productivity is a key element in controlling this business area. Experience shows that 400 to 500% improvements in productivity are possible with a 2-yr period. Improving the productivity of the procurement engineering function is important in today's competitive utility environment.more » Procurement engineering typically involves four distinct technical evaluation responsibilities along with several administrative areas. Technical evaluations include the functionally based safety classification of replacement components and parts (lacking a master parts list), the determination of dedication requirements for safety-related commercial-grade items, the preparation of a procurement specification to maintain the licensed design bases, and the equivalency evaluation of alternate items not requiring the design-change process. Administrative duties include obtaining technical review of vendor-supplied documentation, identifying obsolete parts and components, resolving material nonconformances, initiating the design-change process for replacement items (as needed), and providing technical support to O M. Although most utilities may not perform or require all the noted activities, a large percentage will apply to each utility station.« less
Flat panel display test and evaluation: procedures, standards, and facilities
NASA Astrophysics Data System (ADS)
Jackson, Timothy W.; Daniels, Reginald; Hopper, Darrel G.
1997-07-01
This paper addresses flat panel display test and evaluation via a discussion of procedures, standards and facilities. Procedures need to be carefully developed and documented to ensure that test accomplished in separate laboratories produce comparable results. The tests themselves must not be a source of inconsistency in test results when such comparisons are made in the course of procurements or new technology prototype evaluations. Standards are necessary to expedite the transition of the new display technologies into applications and to lower the costs of custom parts applied across disparate applications. The flat panel display industry is in the course of ascertaining and formulating such standards as they are of value to designers, manufacturers, marketers and users of civil and military products and equipment. Additionally, in order to inform the DoD and industry, the test and evaluation facilities of the Air Force Research Laboratory Displays Branch are described. These facilities are available to support procurements involving flat panel displays and to examine new technology prototypes. Finally, other government display testing facilities within the Navy and the Army are described.
48 CFR 23.204 - Procurement exemptions.
Code of Federal Regulations, 2012 CFR
2012-10-01
... PROGRAMS ENVIRONMENT, ENERGY AND WATER EFFICIENCY, RENEWABLE ENERGY TECHNOLOGIES, OCCUPATIONAL SAFETY, AND DRUG-FREE WORKPLACE Energy and Water Efficiency and Renewable Energy 23.204 Procurement exemptions. An agency is not required to procure an ENERGY STAR ® or FEMP-designated product if the head of the agency...
48 CFR 23.204 - Procurement exemptions.
Code of Federal Regulations, 2011 CFR
2011-10-01
... PROGRAMS ENVIRONMENT, ENERGY AND WATER EFFICIENCY, RENEWABLE ENERGY TECHNOLOGIES, OCCUPATIONAL SAFETY, AND DRUG-FREE WORKPLACE Energy and Water Efficiency and Renewable Energy 23.204 Procurement exemptions. An agency is not required to procure an ENERGY STAR® or FEMP-designated product if the head of the agency...
48 CFR 23.204 - Procurement exemptions.
Code of Federal Regulations, 2013 CFR
2013-10-01
... PROGRAMS ENVIRONMENT, ENERGY AND WATER EFFICIENCY, RENEWABLE ENERGY TECHNOLOGIES, OCCUPATIONAL SAFETY, AND DRUG-FREE WORKPLACE Energy and Water Efficiency and Renewable Energy 23.204 Procurement exemptions. An agency is not required to procure an ENERGY STAR ® or FEMP-designated product if the head of the agency...
48 CFR 23.204 - Procurement exemptions.
Code of Federal Regulations, 2010 CFR
2010-10-01
... PROGRAMS ENVIRONMENT, ENERGY AND WATER EFFICIENCY, RENEWABLE ENERGY TECHNOLOGIES, OCCUPATIONAL SAFETY, AND DRUG-FREE WORKPLACE Energy and Water Efficiency and Renewable Energy 23.204 Procurement exemptions. An agency is not required to procure an ENERGY STAR® or FEMP-designated product if the head of the agency...
48 CFR 23.204 - Procurement exemptions.
Code of Federal Regulations, 2014 CFR
2014-10-01
... PROGRAMS ENVIRONMENT, ENERGY AND WATER EFFICIENCY, RENEWABLE ENERGY TECHNOLOGIES, OCCUPATIONAL SAFETY, AND DRUG-FREE WORKPLACE Energy and Water Efficiency and Renewable Energy 23.204 Procurement exemptions. An agency is not required to procure an ENERGY STAR ® or FEMP-designated product if the head of the agency...
48 CFR 1302.101 - Definitions.
Code of Federal Regulations, 2010 CFR
2010-10-01
... and Assistant Secretary for Administration, the head of the agency for procurement matters shall be... means an individual designated authority by the Senior Bureau Procurement Official (BPO) to enter into... positions, the Head of the Agency, the Procurement Executive, and the Heads of Operating Units are also...
Advanced Gas Turbine (AGT) power-train system development
NASA Technical Reports Server (NTRS)
Helms, H. E.; Johnson, R. A.; Gibson, R. K.
1982-01-01
Technical work on the design and component testing of a 74.5 kW (100 hp) advanced automotive gas turbine is described. Selected component ceramic component design, and procurement were tested. Compressor tests of a modified rotor showed high speed performance improvement over previous rotor designs; efficiency improved by 2.5%, corrected flow by 4.6%, and pressure ratio by 11.6% at 100% speed. The aerodynamic design is completed for both the gasifier and power turbines. Ceramic (silicon carbide) gasifier rotors were spin tested to failure. Improving strengths is indicated by burst speeds and the group of five rotors failed at speeds between 104% and 116% of engine rated speed. The emission results from combustor testing showed NOx levels to be nearly one order of magnitude lower than with previous designs. A one piece ceramic exhaust duct/regenerator seal platform is designed with acceptable low stress levels.
Code of Federal Regulations, 2013 CFR
2013-01-01
... biobased carbon in the product as a percent of the weight (mass) of the total organic carbon in the... of the Department of Agriculture (Continued) OFFICE OF PROCUREMENT AND PROPERTY MANAGEMENT, DEPARTMENT OF AGRICULTURE GUIDELINES FOR DESIGNATING BIOBASED PRODUCTS FOR FEDERAL PROCUREMENT Designated...
Code of Federal Regulations, 2014 CFR
2014-01-01
... biobased carbon in the product as a percent of the weight (mass) of the total organic carbon in the... of the Department of Agriculture (Continued) OFFICE OF PROCUREMENT AND PROPERTY MANAGEMENT, DEPARTMENT OF AGRICULTURE GUIDELINES FOR DESIGNATING BIOBASED PRODUCTS FOR FEDERAL PROCUREMENT Designated...
Photovoltaic balance-of-system designs and costs at PVUSA
NASA Astrophysics Data System (ADS)
Reyes, A. B.; Jennings, C.
1995-05-01
This report is one in a series of 1994-1995 PVUSA reports that document PVUSA lessons learned at demonstration sites in California and Texas. During the last 7 years (1988 to 1994), 16 PV systems ranging from 20 kW to 500 kW have been installed. Six 20-kW emerging module technology (EMT) arrays and three turnkey (i.e., vendor designed and integrated) utility-scale systems were procured and installed at PVUSA's main test site in Davis, California. PVUSA host utilities have installed a total of seven EMT arrays and utility-scale systems in their service areas. Additional systems at Davis and host utility sites are planned. One of PVUSA's key objectives is to evaluate the performance, reliability, and cost of PV balance-of-system (BOS). In the procurement stage PVUSA encouraged innovative design to improve upon present practice by reducing maintenance, improving reliability, or lowering manufacturing or construction costs. The project team worked closely with suppliers during the design stage not only to ensure designs met functional and safety specifications, but to provide suggestions for improvement. This report, intended for the photovoltaic (PV) industry and for utility project managers and engineers considering PV plant construction and ownership, documents PVUSA utility-scale system design and cost lessons learned. Complementary PVUSA topical reports document: construction and safety experience; five-year assessment of EMTs; validation of the Kerman 500-kW grid-support PV plant benefits; PVUSA instrumentation and data analysis techniques; procurement, acceptance, and rating practices for PV power plants; experience with power conditioning units and power quality.
23 CFR 636.109 - How does the NEPA process relate to the design-build procurement process?
Code of Federal Regulations, 2014 CFR
2014-04-01
... 23 Highways 1 2014-04-01 2014-04-01 false How does the NEPA process relate to the design-build... TRANSPORTATION ENGINEERING AND TRAFFIC OPERATIONS DESIGN-BUILD CONTRACTING General § 636.109 How does the NEPA process relate to the design-build procurement process? The purpose of this section is to ensure that...
23 CFR 636.109 - How does the NEPA process relate to the design-build procurement process?
Code of Federal Regulations, 2011 CFR
2011-04-01
... 23 Highways 1 2011-04-01 2011-04-01 false How does the NEPA process relate to the design-build... TRANSPORTATION ENGINEERING AND TRAFFIC OPERATIONS DESIGN-BUILD CONTRACTING General § 636.109 How does the NEPA process relate to the design-build procurement process? The purpose of this section is to ensure that...
23 CFR 636.109 - How does the NEPA process relate to the design-build procurement process?
Code of Federal Regulations, 2010 CFR
2010-04-01
... 23 Highways 1 2010-04-01 2010-04-01 false How does the NEPA process relate to the design-build... TRANSPORTATION ENGINEERING AND TRAFFIC OPERATIONS DESIGN-BUILD CONTRACTING General § 636.109 How does the NEPA process relate to the design-build procurement process? The purpose of this section is to ensure that...
23 CFR 636.109 - How does the NEPA process relate to the design-build procurement process?
Code of Federal Regulations, 2012 CFR
2012-04-01
... 23 Highways 1 2012-04-01 2012-04-01 false How does the NEPA process relate to the design-build... TRANSPORTATION ENGINEERING AND TRAFFIC OPERATIONS DESIGN-BUILD CONTRACTING General § 636.109 How does the NEPA process relate to the design-build procurement process? The purpose of this section is to ensure that...
23 CFR 636.109 - How does the NEPA process relate to the design-build procurement process?
Code of Federal Regulations, 2013 CFR
2013-04-01
... 23 Highways 1 2013-04-01 2013-04-01 false How does the NEPA process relate to the design-build... TRANSPORTATION ENGINEERING AND TRAFFIC OPERATIONS DESIGN-BUILD CONTRACTING General § 636.109 How does the NEPA process relate to the design-build procurement process? The purpose of this section is to ensure that...
Federal procurement metrication appropriateness and methods
NASA Astrophysics Data System (ADS)
Coella, M. A.
1982-09-01
This study was designed to provide the USMB with a clearer understanding of the basic relationships between the Federal procurement process and private sector suppliers. This was done to gain an understanding of the ways in which Federal procurement can encourage and accommodate initiatives of the private sector and to ensure that the effects of conversion on the Federal and private sectors are understood prior to implementation of procurement decisions and actions.
42 CFR 486.320 - Condition: Participation in Organ Procurement and Transplantation Network.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 42 Public Health 5 2010-10-01 2010-10-01 false Condition: Participation in Organ Procurement and Transplantation Network. 486.320 Section 486.320 Public Health CENTERS FOR MEDICARE & MEDICAID SERVICES....320 Condition: Participation in Organ Procurement and Transplantation Network. After being designated...
42 CFR 486.320 - Condition: Participation in Organ Procurement and Transplantation Network.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 42 Public Health 5 2011-10-01 2011-10-01 false Condition: Participation in Organ Procurement and Transplantation Network. 486.320 Section 486.320 Public Health CENTERS FOR MEDICARE & MEDICAID SERVICES....320 Condition: Participation in Organ Procurement and Transplantation Network. After being designated...
Air Force Logistics Command (AFLC) solar thermal plant
NASA Technical Reports Server (NTRS)
1983-01-01
The plant proved its capability to deliver the desired energy product in a USAF industrial environment. The collector proved capable of energy conversion at insolation levels up to 25% below design minimum. The plant and the project were negatively affected by severe winter weather, with total insolation during the test period 60 percent less than the expected value. Environmental effects reduced plant availability to 55 percent. Only five, minimally good operating days were experienced during the test period. The subsequent lack of performance data prohibits the drawing of general conclusions regarding system performance. System operability was rated generally high. The only inhibiting factor was the difficulty in procuring replacement parts for rapid repair under USAF stockage and procurement policies. No inherently serious system failures were recorded, although a thermostatic valve malfunction in the freeze protection system ultimately took 30 days to repair.
1975-07-01
the product , including its operational and maintenance requirements . However, there are many other program elements that are equally critical, i.e...customer needs into meaningful, practical requirements which can be met by the designer, verified in the product and used effectively by the operator. The...and government) and H- Production Verification Testing Requirements , spread over longer delivery periods, causing problems of shop load, high cash
Performance features of 22-cell, 19Ah single pressure vessel nickel hydrogen battery
NASA Technical Reports Server (NTRS)
Rao, Gopalakrishna M.; Vaidyanathan, Hari
1996-01-01
Two 22-cells 19Ah Nickel-Hydrogen (Ni-H2) Single Pressure Vessel (SPV) Qual batteries, one each from EPI/Joplin and EPI/Butler, were designed and procured. The two batteries differ in the cell encapsulation technology, stack preload, and activation procedure. Both the Butler and Joplin batteries met the specified requirements when subjected to qualification testing and completed 2100 and 1300 LEO cycles respectively, with nominal performance. This paper discusses advantages, design features, testing procedures, and results of the two single pressure vessel Ni-H2 batteries.
75 FR 34282 - Federal Acquisition Regulation; FAR Case 2009-014, New Designated Country-Taiwan
Federal Register 2010, 2011, 2012, 2013, 2014
2010-06-16
... Government Procurement. DATES: Effective Date: June 16, 2010. FOR FURTHER INFORMATION CONTACT: Ms. Lori... Government Procurement. The interim rule added Taiwan to the list of World Trade Organization Government... seq., because, although this rule opens up Government procurement to the goods and services of Taiwan...
13 CFR 305.6 - Allowable methods of procurement for construction services.
Code of Federal Regulations, 2011 CFR
2011-01-01
... Approved Projects § 305.6 Allowable methods of procurement for construction services. (a) Recipients may... design/build, construction management at risk and force account. If an alternate method is used, the... 13 Business Credit and Assistance 1 2011-01-01 2011-01-01 false Allowable methods of procurement...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-12-31
... discriminatory barriers to procurements of supplies and services produced by industrial enterprises of the other... a designated country under the World Trade Organization Government Procurement Agreement. II..., the U.S. Secretary of Defense signed a new reciprocal defense procurement agreement with the Polish...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-03-29
... Procurement Service Area AGENCY: Centers for Medicare & Medicaid Services (CMS), HHS. ACTION: Notice with... require the hospital to enter into an agreement with its designated Organ Procurement Organization (OPO... Organ Procurement Organizations (OPOs) are not-for-profit organizations that are responsible for the...
Long-Term Implications of the 2016 Future Years Defense Program
2016-01-01
operation and maintenance activities; acquisition includes research, development, test, and evaluation as well as procurement of weapon systems and other...group includes procurement and research, development, test, and evaluation (RDT&E). Appropriations for procurement fund the purchase of new weapon...and Evaluation Military Construction Family Housing OCO Funding Actual FYDP Period Beyond the FYDP PeriodDoD’s Estimates For 2017 through 2020 DoD
7 CFR 2902.48 - General purpose household cleaners.
Code of Federal Regulations, 2010 CFR
2010-01-01
... PROCUREMENT Designated Items § 2902.48 General purpose household cleaners. (a) Definition. Products designed... procurement preference for qualifying biobased general purpose household cleaners. By that date, Federal... 7 Agriculture 15 2010-01-01 2010-01-01 false General purpose household cleaners. 2902.48 Section...
From Marginal Adjustments to Meaningful Change: Rethinking Weapon System Acquisition
2010-01-01
phones, digital cameras, Blackberries , GPS navigation systems, Bluetooth headsets, et cetera. To achieve these breakthroughs, businesses accept a greater...informing the detailed design phase—is less valid. For instance, even with advances in computational fl uid dynamics, wind tunnel testing and live fl ight...of Federal Procurement Pol- icy, 2007. Antón, Philip S., Eugene C. Gritton, Richard Mesic, and Paul Steinberg, Wind Tunnel and Propulsion Test
Competitiveness Improvement Project Informational Workshop
DOE Office of Scientific and Technical Information (OSTI.GOV)
Sinclair, Karin C; Preus, Robert W; Dana, Scott
This presentation was given at the Competitiveness Improvement Project (CIP) Informational Workshop on December 6, 2017. Topics covered during the workshop include an overview of the CIP, past projects, scoring criteria, technical support opportunities, certification body requirements, standards applicable to distributed wind generators, information on the National Electric Code, certification testing requirements, test site requirements, National Environmental Policy Act, design review, levelized cost of energy, procurement/contracting, project management/deliverables, and outreach materials.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hunt, W.D.M.; Conover, D.R.; Stockmeyer, M.K.
1995-11-01
In 1990 the New Technology Demonstration Program (formerly the Test Bed Demonstration Program) was initiated by the US Department of Energy`s Office (DOE`s) of Federal Energy Management Programs with the purpose of accelerating the introduction of new technologies into the Federal sector. The program has since expanded into a multi-laboratory collaborative effort that evaluates new technologies and shares the results with the Federal design and procurement communities. These evaluations are performed on a collaborative basis which typically includes technology manufacturers, Federal facilities, utilities, trade associations, research institutes, and other in partnership with DOE. The end result is a range ofmore » effective technology transfer tools that provide operations and performance data on new technologies to Federal designers, building managers, and procurement officials. These tools assist in accelerating a technology`s Federal application and realizing reductions in energy consumption and costs.« less
41 CFR 51-5.3 - Scope of requirement.
Code of Federal Regulations, 2011 CFR
2011-07-01
... National Stock Number or item designation is specified by the Procurement List. Where geographic areas... source requirement covers the National Stock Number or item designation listed and commodities that are.... (b) For services, where an agency and location or geographic area are listed on the Procurement List...
41 CFR 51-5.3 - Scope of requirement.
Code of Federal Regulations, 2013 CFR
2013-07-01
... National Stock Number or item designation is specified by the Procurement List. Where geographic areas... source requirement covers the National Stock Number or item designation listed and commodities that are.... (b) For services, where an agency and location or geographic area are listed on the Procurement List...
41 CFR 51-5.3 - Scope of requirement.
Code of Federal Regulations, 2012 CFR
2012-07-01
... National Stock Number or item designation is specified by the Procurement List. Where geographic areas... source requirement covers the National Stock Number or item designation listed and commodities that are.... (b) For services, where an agency and location or geographic area are listed on the Procurement List...
41 CFR 51-5.3 - Scope of requirement.
Code of Federal Regulations, 2014 CFR
2014-07-01
... National Stock Number or item designation is specified by the Procurement List. Where geographic areas... source requirement covers the National Stock Number or item designation listed and commodities that are.... (b) For services, where an agency and location or geographic area are listed on the Procurement List...
76 FR 53938 - Order of Succession for the Office of the Chief Procurement Officer
Federal Register 2010, 2011, 2012, 2013, 2014
2011-08-30
... DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT [Docket No. FR-5561-D-02] Order of Succession for the...: Notice of Order of Succession. SUMMARY: In this notice, the Chief Procurement Officer designates the Order of Succession for the Office of the Chief Procurement Officer. DATES: Effective Date: August 19...
Buoy Technology survey USCG Buoy Development Review
1990-10-01
by the United States Coadst Guard, IALA Conference, No. 3.1.5, Tokyo, 1980 . 3P.H. Glage, Design, Procurement and Testing of Plastic Fast Water Buoys on...may include published reports, unpublished reports, and USCG files. 23 PROJECT SUMMARY NO. 1 ARTICULATED BEACON DEVELOPMENT DATES: 1980 to Present...PROJECT DATE’%: 1980 to Present OBJECTIVE: The purpose of this project is to design a special buoy for use in exposed offshore locations where high
7 CFR 3201.48 - General purpose household cleaners.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 7 Agriculture 15 2013-01-01 2013-01-01 false General purpose household cleaners. 3201.48 Section 3201.48 Agriculture Regulations of the Department of Agriculture (Continued) OFFICE OF PROCUREMENT AND PROPERTY MANAGEMENT, DEPARTMENT OF AGRICULTURE GUIDELINES FOR DESIGNATING BIOBASED PRODUCTS FOR FEDERAL PROCUREMENT Designated Items § 3201.48...
7 CFR 3201.34 - Carpet and upholstery cleaners.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 7 Agriculture 15 2013-01-01 2013-01-01 false Carpet and upholstery cleaners. 3201.34 Section 3201.34 Agriculture Regulations of the Department of Agriculture (Continued) OFFICE OF PROCUREMENT AND PROPERTY MANAGEMENT, DEPARTMENT OF AGRICULTURE GUIDELINES FOR DESIGNATING BIOBASED PRODUCTS FOR FEDERAL PROCUREMENT Designated Items § 3201.34 Carpet...
7 CFR 3201.30 - Glass cleaners.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 7 Agriculture 15 2012-01-01 2012-01-01 false Glass cleaners. 3201.30 Section 3201.30 Agriculture Regulations of the Department of Agriculture (Continued) OFFICE OF PROCUREMENT AND PROPERTY MANAGEMENT, DEPARTMENT OF AGRICULTURE GUIDELINES FOR DESIGNATING BIOBASED PRODUCTS FOR FEDERAL PROCUREMENT Designated Items § 3201.30 Glass cleaners. (a)...
7 CFR 3201.34 - Carpet and upholstery cleaners.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 7 Agriculture 15 2014-01-01 2014-01-01 false Carpet and upholstery cleaners. 3201.34 Section 3201.34 Agriculture Regulations of the Department of Agriculture (Continued) OFFICE OF PROCUREMENT AND PROPERTY MANAGEMENT, DEPARTMENT OF AGRICULTURE GUIDELINES FOR DESIGNATING BIOBASED PRODUCTS FOR FEDERAL PROCUREMENT Designated Items § 3201.34 Carpet...
7 CFR 3201.30 - Glass cleaners.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 7 Agriculture 15 2014-01-01 2014-01-01 false Glass cleaners. 3201.30 Section 3201.30 Agriculture Regulations of the Department of Agriculture (Continued) OFFICE OF PROCUREMENT AND PROPERTY MANAGEMENT, DEPARTMENT OF AGRICULTURE GUIDELINES FOR DESIGNATING BIOBASED PRODUCTS FOR FEDERAL PROCUREMENT Designated Items § 3201.30 Glass cleaners. (a)...
7 CFR 3201.105 - Microbial cleaning products.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 7 Agriculture 15 2014-01-01 2014-01-01 false Microbial cleaning products. 3201.105 Section 3201.105 Agriculture Regulations of the Department of Agriculture (Continued) OFFICE OF PROCUREMENT AND PROPERTY MANAGEMENT, DEPARTMENT OF AGRICULTURE GUIDELINES FOR DESIGNATING BIOBASED PRODUCTS FOR FEDERAL PROCUREMENT Designated Items § 3201.105 Microbia...
7 CFR 3201.30 - Glass cleaners.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 7 Agriculture 15 2013-01-01 2013-01-01 false Glass cleaners. 3201.30 Section 3201.30 Agriculture Regulations of the Department of Agriculture (Continued) OFFICE OF PROCUREMENT AND PROPERTY MANAGEMENT, DEPARTMENT OF AGRICULTURE GUIDELINES FOR DESIGNATING BIOBASED PRODUCTS FOR FEDERAL PROCUREMENT Designated Items § 3201.30 Glass cleaners. (a)...
7 CFR 3201.34 - Carpet and upholstery cleaners.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 7 Agriculture 15 2012-01-01 2012-01-01 false Carpet and upholstery cleaners. 3201.34 Section 3201.34 Agriculture Regulations of the Department of Agriculture (Continued) OFFICE OF PROCUREMENT AND PROPERTY MANAGEMENT, DEPARTMENT OF AGRICULTURE GUIDELINES FOR DESIGNATING BIOBASED PRODUCTS FOR FEDERAL PROCUREMENT Designated Items § 3201.34 Carpet...
7 CFR 3201.48 - General purpose household cleaners.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 7 Agriculture 15 2014-01-01 2014-01-01 false General purpose household cleaners. 3201.48 Section 3201.48 Agriculture Regulations of the Department of Agriculture (Continued) OFFICE OF PROCUREMENT AND PROPERTY MANAGEMENT, DEPARTMENT OF AGRICULTURE GUIDELINES FOR DESIGNATING BIOBASED PRODUCTS FOR FEDERAL PROCUREMENT Designated Items § 3201.48...
7 CFR 3201.48 - General purpose household cleaners.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 7 Agriculture 15 2012-01-01 2012-01-01 false General purpose household cleaners. 3201.48 Section 3201.48 Agriculture Regulations of the Department of Agriculture (Continued) OFFICE OF PROCUREMENT AND PROPERTY MANAGEMENT, DEPARTMENT OF AGRICULTURE GUIDELINES FOR DESIGNATING BIOBASED PRODUCTS FOR FEDERAL PROCUREMENT Designated Items § 3201.48...
7 CFR 3201.40 - Laundry products.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 7 Agriculture 15 2014-01-01 2014-01-01 false Laundry products. 3201.40 Section 3201.40 Agriculture Regulations of the Department of Agriculture (Continued) OFFICE OF PROCUREMENT AND PROPERTY MANAGEMENT, DEPARTMENT OF AGRICULTURE GUIDELINES FOR DESIGNATING BIOBASED PRODUCTS FOR FEDERAL PROCUREMENT Designated Items § 3201.40 Laundry products. (a)...
7 CFR 3201.40 - Laundry products.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 7 Agriculture 15 2013-01-01 2013-01-01 false Laundry products. 3201.40 Section 3201.40 Agriculture Regulations of the Department of Agriculture (Continued) OFFICE OF PROCUREMENT AND PROPERTY MANAGEMENT, DEPARTMENT OF AGRICULTURE GUIDELINES FOR DESIGNATING BIOBASED PRODUCTS FOR FEDERAL PROCUREMENT Designated Items § 3201.40 Laundry products. (a)...
7 CFR 3201.40 - Laundry products.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 7 Agriculture 15 2012-01-01 2012-01-01 false Laundry products. 3201.40 Section 3201.40 Agriculture Regulations of the Department of Agriculture (Continued) OFFICE OF PROCUREMENT AND PROPERTY MANAGEMENT, DEPARTMENT OF AGRICULTURE GUIDELINES FOR DESIGNATING BIOBASED PRODUCTS FOR FEDERAL PROCUREMENT Designated Items § 3201.40 Laundry products. (a)...
7 CFR 3201.62 - Bath products.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 7 Agriculture 15 2014-01-01 2014-01-01 false Bath products. 3201.62 Section 3201.62 Agriculture Regulations of the Department of Agriculture (Continued) OFFICE OF PROCUREMENT AND PROPERTY MANAGEMENT, DEPARTMENT OF AGRICULTURE GUIDELINES FOR DESIGNATING BIOBASED PRODUCTS FOR FEDERAL PROCUREMENT Designated Items § 3201.62 Bath products. (a)...
7 CFR 3201.62 - Bath products.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 7 Agriculture 15 2012-01-01 2012-01-01 false Bath products. 3201.62 Section 3201.62 Agriculture Regulations of the Department of Agriculture (Continued) OFFICE OF PROCUREMENT AND PROPERTY MANAGEMENT, DEPARTMENT OF AGRICULTURE GUIDELINES FOR DESIGNATING BIOBASED PRODUCTS FOR FEDERAL PROCUREMENT Designated Items § 3201.62 Bath products. (a)...
7 CFR 3201.62 - Bath products.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 7 Agriculture 15 2013-01-01 2013-01-01 false Bath products. 3201.62 Section 3201.62 Agriculture Regulations of the Department of Agriculture (Continued) OFFICE OF PROCUREMENT AND PROPERTY MANAGEMENT, DEPARTMENT OF AGRICULTURE GUIDELINES FOR DESIGNATING BIOBASED PRODUCTS FOR FEDERAL PROCUREMENT Designated Items § 3201.62 Bath products. (a)...
77 FR 25632 - Guidelines for Designating Biobased Products for Federal Procurement
Federal Register 2010, 2011, 2012, 2013, 2014
2012-05-01
... guidelines will not affect products that have already been designated for Federal procurement preference. Any... technological limitations. USDA recognizes that, in general, the Federal government does not purchase large... decision to clarify the terminology used in the BioPreferred program by avoiding, to the extent possible...
7 CFR 3201.26 - Lip care products.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 7 Agriculture 15 2012-01-01 2012-01-01 false Lip care products. 3201.26 Section 3201.26 Agriculture Regulations of the Department of Agriculture (Continued) OFFICE OF PROCUREMENT AND PROPERTY MANAGEMENT, DEPARTMENT OF AGRICULTURE GUIDELINES FOR DESIGNATING BIOBASED PRODUCTS FOR FEDERAL PROCUREMENT Designated Items § 3201.26 Lip care products. (a...
7 CFR 3201.26 - Lip care products.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 7 Agriculture 15 2013-01-01 2013-01-01 false Lip care products. 3201.26 Section 3201.26 Agriculture Regulations of the Department of Agriculture (Continued) OFFICE OF PROCUREMENT AND PROPERTY MANAGEMENT, DEPARTMENT OF AGRICULTURE GUIDELINES FOR DESIGNATING BIOBASED PRODUCTS FOR FEDERAL PROCUREMENT Designated Items § 3201.26 Lip care products. (a...
7 CFR 3201.26 - Lip care products.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 7 Agriculture 15 2014-01-01 2014-01-01 false Lip care products. 3201.26 Section 3201.26 Agriculture Regulations of the Department of Agriculture (Continued) OFFICE OF PROCUREMENT AND PROPERTY MANAGEMENT, DEPARTMENT OF AGRICULTURE GUIDELINES FOR DESIGNATING BIOBASED PRODUCTS FOR FEDERAL PROCUREMENT Designated Items § 3201.26 Lip care products. (a...
7 CFR 3201.66 - Cuts, burns, and abrasions ointments.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 7 Agriculture 15 2014-01-01 2014-01-01 false Cuts, burns, and abrasions ointments. 3201.66 Section... PROCUREMENT Designated Items § 3201.66 Cuts, burns, and abrasions ointments. (a) Definition. Products designed..., in accordance with this part, will give a procurement preference for qualifying biobased cuts, burns...
7 CFR 3201.66 - Cuts, burns, and abrasions ointments.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 7 Agriculture 15 2013-01-01 2013-01-01 false Cuts, burns, and abrasions ointments. 3201.66 Section... PROCUREMENT Designated Items § 3201.66 Cuts, burns, and abrasions ointments. (a) Definition. Products designed..., in accordance with this part, will give a procurement preference for qualifying biobased cuts, burns...
7 CFR 3201.66 - Cuts, burns, and abrasions ointments.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 7 Agriculture 15 2012-01-01 2012-01-01 false Cuts, burns, and abrasions ointments. 3201.66 Section... PROCUREMENT Designated Items § 3201.66 Cuts, burns, and abrasions ointments. (a) Definition. Products designed..., in accordance with this part, will give a procurement preference for qualifying biobased cuts, burns...
32 CFR 516.4 - Responsibilities.
Code of Federal Regulations, 2011 CFR
2011-07-01
... other attorneys designated by the Chief will represent DA in all procurement fraud and corruption... procurement fraud and corruption. (o) Chief, Environmental Law Division, USALSA. The Chief, Environmental Law...
Advanced Rotorcraft Transmission (ART) program status
NASA Technical Reports Server (NTRS)
Bossler, Robert; Heath, Gregory
1991-01-01
Reported herein is work done on the Advanced Rotorcraft Transmission by McDonnell Douglas Helicopter Company under Army/NASA contract. The novel concept pursued includes the use of face gears for power transmission and a torque splitting arrangement. The design reduces the size and weight of the corner-turning hardware and the next reduction stage. New methods of analyzing face gears have increased confidence in their usefulness. Test gears have been designed and manufactured for power transmission testing on the NASA-Lewis spiral bevel test rig. Transmission design effort has included finite element modeling of the split torque paths to assure equal deflection under load. A finite element model of the Apache main transmission has been completed to substantiate noise prediction methods. A positive engagement overrunning clutch design is described. Test spur gears have been made by near-net-shape forging from five different materials. Three housing materials have been procured for evaluation testing.
A Technical Description of the Officer Procurement Model (TOPOPS). Final Report.
ERIC Educational Resources Information Center
Akman, Allan; And Others
The Total Objective Plan for the Officer Procurement System (TOPOPS) is an aggregate-level, computer-based model of the Air Force Officer procurement system developed to operate on the UNIVAC 1108 system. It is designed to simulate officer accession and training and achieve optimal solutions in terms of either cost minimization or accession…
A Conceptual View of the Officer Procurement Model (TOPOPS). Technical Report No. 73-73.
ERIC Educational Resources Information Center
Akman, Allan; Nordhauser, Fred
This report presents the conceptual design of a computer-based linear programing model of the Air Force officer procurement system called TOPOPS. The TOPOPS model is an aggregate model which simulates officer accession and training and is directed at optimizing officer procurement in terms of either minimizing cost or maximizing accession quality…
1984-03-01
Engineering initiative to develop an orderly plan and procedure to assure that USAF acquire reliable, high quality, supportable avionics with a higher avail...susceptibility te~t~ (radiated and conducted), and emission of radio frequency energy tests."l6) Other electrical stresses can include over/under voltage...jo ints, poor welds, and dielectric defects. Also, instruments with components unable to endu very high temperatures can be safely tested. 1-19
1984-12-01
model pr, vides a method for communicating a specific training equipment design to the procurement office after A"~- ISD ana lysis has est~blished a...maintenance trainer has been identified. The model provides a method by which a training equipment design can be communicated to the System Project Office...ensure * ase of development of procurement specifications and consistency between different documented designs. A completed application of this maodel
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
2004-06-01
This guide was prepared to be a resource for federal construction project managers and others who want to integrate the principles of sustainable design into the procurement of professional building design and consulting services. To economize on energy costs and improve the safety, comfort, and health of building occupants, building design teams can incorporate daylighting, energy efficiency, renewable energy, and passive solar design into all projects in which these elements are technically and economically feasible. The information presented here will help project leaders begin the process and manage the inclusion of sustainable design in the procurement process. The section onmore » establishing selection criteria contains key elements to consider before selecting an architectural and engineering (A/E) firm. The section on preparing the statement of work discusses the broad spectrum of sustainable design services that an A/E firm can provide. Several helpful checklists are included.« less
BIM-Based E-Procurement: An Innovative Approach to Construction E-Procurement
2015-01-01
This paper presents an innovative approach to e-procurement in construction, which uses building information models (BIM) to support the construction procurement process. The result is an integrated and electronic instrument connected to a rich knowledge base capable of advanced operations and able to strengthen transaction relationships and collaboration throughout the supply chain. The BIM-based e-procurement prototype has been developed using distinct existing electronic solutions and an IFC server and was tested in a pilot case study, which supported further discussions of the results of the research. PMID:26090518
Significance of ITER IWS Material Selection and Qualification
NASA Astrophysics Data System (ADS)
Mehta, Bhoomi K.; Raval, Jigar; Maheshwari, Abha; Laad, Rahul; Singh, Gurlovleen; Pathak, Haresh
2017-04-01
In-Wall Shielding (IWS) is one of the important components of ITER Vacuum Vessel (VV) which fills the space between double walls of VV with cooling water. Procurement Arrangement (PA) for IWS has been signed with Indian Domestic Agency (INDA). Procurement of IWS materials, fabrication of IWS blocks and its delivery to respective Domestic Agency (DA) and ITER Organization (IO) are the main scope of this PA. Hence, INDIA is the only country which is contributing to VV IWS among all seven ITER partners. The main functions of the IWS are to provide Neutron Shielding with blanket, VV shells and water during plasma operations and to reduce ripple of the Toroidal Magnetic Field. To meet these functional requirements IWS blocks are made up of special materials (Borated Steels SS304 B4 & SS304 B7, Ferritic Steels SS 430, Austenitic Steel SS 316 L (N)-IG, XM-19 and Inconel-625) which are qualified, reliable and traceable for the design assessment. The choice of these materials has a significant influence on performance, maintainability, licensing, detailed design parameters and waste disposal. The main reasons for the materials selected for IWS are its high mechanical strength at operating temperatures, water chemistry properties, excellent fabrication characteristics and low cost relative to other similar materials. All the materials are qualified with respect to their respective codes (ASTM/EN standards with additional requirements as described in RCC-MR code 2007) and ITER requirements. Agreed Notified Body (ANB) has control conformity of materials certificates with approved material specification and traceability procedure for Safety Important Component (SIC). The procurement strategy for all the IWS materials has been developed in close collaboration with IO, ANB and Industries as per Product Procurement Specification (PPS). The R&D for sample, bulk material production, testing, inspection and handling as required are carried out by IN DA and IO. At present almost all IWS materials (∼2500 Tons) has been procured by IN DA with spares to manufacture ∼9000 IWS blocks. This paper summarizes IWS material selection, qualification and procurement processes in detail.
Unique Procurement Process Expands Microgrid Research Capabilities at the
competitive procurement process provided comparative research on multiple controller technologies, which will be made publicly available on GitHub. "We always set out to design and build innovative advance the design and performance of controls for future microgrids, and of the larger U.S. power system
NASA Astrophysics Data System (ADS)
Alard, Robert; Gustafsson, Martin; Nienhaus, Jörg
The management of buyer-supplier relations is a major topic for many enterprises today. Modern Information and Communication Technologies (ICT) offer interesting perspectives on opportunities and implementation approaches. Today, logistics and procurement departments of numerous enterprises are evaluating the possibilities and opportunities of new ICT solutions and especially of internet-based electronic procurement solutions for the optimisation and re-engineering of their buyer-supplier relationships. Due to the highly innovative character of the new ICT solutions and the scarcely available operational examples in the industry, only little guidance exists to support responsible managers during the evaluation, planning and designing of internet-based electronic procurement solutions. This paper describes a framework for the strategic evaluation and planning of the deployment of internet-based procurement solutions for direct materials. The presented approach supports enterprises in the analysis of procurement objects and procurement structuring, in the definition and management of buyer-supplier-relationships, in the requirements analysis of ICT solutions as well as the assessment of the potential to support procurement with innovative ICT and internet-based electronic procurement solutions.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Torcellini, Paul A; Scheib, Jennifer G; Pless, Shanti
New construction could account for more than 25% of the U.S. energy consumption by 2030. Millions of square feet are built every year that will not perform as expected - despite advancing codes, rating systems, super-efficient technologies, and advanced utility programs. With retrofits of these under-performers decades away, savings potential will be lost for years to come. Only the building owner is in the driver's seat to demand - and verify - higher-performing buildings. Yet our current policy and market interventions really target the design team, not the owner. Accelerate Performance, a U.S. Department of Energy funded initiative, is changingmore » the building procurement approach to drive deeper, verified savings in three pilot states: Illinois, Minnesota, and Connecticut. Performance-based procurement ties energy performance to design and contractor team compensation while freeing them to meet energy targets with strategies most familiar to them. The process teases out the creativity of the design and contracting teams to deliver energy performance - without driving up the construction cost. The paper will share early results and lessons learned from new procurement and contract approaches in government, public, and private sector building projects. The paper provides practical guidance for building owners, facilities managers, design, and contractor teams who wish to incorporate effective performance-based procurement for deeper energy savings in their buildings.« less
Advanced Gas Turbine (AGT) powertrain system development for automotive applications
NASA Technical Reports Server (NTRS)
1984-01-01
Rotor dynamic instability investigations were conducted. Forward ball bearing hydraulic mount configurations were tested with little effect. Trial assembly of S/N 002 ceramic engine was initiated. Impeller design activities were completed on the straight line element (SLE) blade definition to address near-net-shape powder metal die forging. Performance characteristics of the Baseline Test 2A impeller were closely preserved. The modified blading design has been released for tooling procurement. Developmental testing of the diffusion flame combustor (DFC) for initial use in the S/N 002 2100 F ceramic structures engine was completed. A natural gas slave preheater was designed and fabricated. Preliminary regenerator static seal rig testing showed a significant reduction in leakage and sensitivity to stack height. Ceramic screening tests were completed and two complete sets of ceramic static structures were qualified for engine testing. Efforts on rotor dynamics development to resolve subsynchronous motion were continued.
NASA Technical Reports Server (NTRS)
Krause, D. R.
1972-01-01
A conceptual design was developed for an MLI system which will meet the design constraints of an ILRV used for 7- to 30-day missions. The ten tasks are briefly described: (1) material survey and procurement, material property tests, and selection of composites to be considered; (2) definition of environmental parameters and tooling requirements, and thermal and structural design verification test definition; (3) definition of tanks and associated hardware to be used, and definition of MLI concepts to be considered; (4) thermal analyses, including purge, evacuation, and reentry repressurization analyses; (5) structural analyses (6) thermal degradation tests of composite and structural tests of fastener; (7) selection of MLI materials and system; (8) definition of a conceptual MLI system design; (9) evaluation of nondestructive inspection techniques and definition of procedures for repair of damaged areas; and (10) preparation of preliminary specifications.
An evaluation of transit procurement training.
Noland, Robert B; Weiner, Marc D; Klein, Nicholas J; Puniello, Orin D
2017-04-01
We evaluated a training course called "Orientation to Transit Procurement", designed and conducted by the National Transit Institute. This course is designed to provide Federal Transit Administration (FTA) grantees an overview of regulations and best practices related to the procurement process. Our objective in conducting the evaluation was to understand how transit agency staff made changes in procurement practices in response to the course training. The evaluation was mixed mode: an Internet survey followed by in-depth interviews with a small group of respondents. Survey respondents were also provided with an open-ended question providing us with additional context for our evaluation. Results show that the training is substantially successful at meeting the goal of improving procurement practices at transit agencies; indeed, most respondents report making changes at their agencies as the proximate result of the training. This was at odds with our exploration of knowledge of procurement topics, as most respondents gave inaccurate answers on multiple-choice "knowledge questions". This may have been due to question structure or, more likely, the nature of online surveys. Suitable training on the procurement of information technology was also a main concern. The lack of training in this area is indicative of the broader challenge facing public transit agencies in how to incorporate new forms of technology into their existing practices and bureaucratic structures. Copyright © 2016 Elsevier Ltd. All rights reserved.
Energy Systems Integration Newsletter | Energy Systems Integration Facility
simulated sequences based on a model network. The competitive procurement process provided comparative , procurement help, design reviews, and now construction support. Miramar project support is part of integrated
22 CFR 124.13 - Procurement by United States persons in foreign countries (offshore procurement).
Code of Federal Regulations, 2012 CFR
2012-04-01
... (build-to-print means producing an end-item (i.e., system, subsystem or component) from technical... of any information which discloses design methodology, engineering analysis, detailed process...
22 CFR 124.13 - Procurement by United States persons in foreign countries (offshore procurement).
Code of Federal Regulations, 2011 CFR
2011-04-01
... (build-to-print means producing an end-item (i.e., system, subsystem or component) from technical... of any information which discloses design methodology, engineering analysis, detailed process...
22 CFR 124.13 - Procurement by United States persons in foreign countries (offshore procurement).
Code of Federal Regulations, 2014 CFR
2014-04-01
... (build-to-print means producing an end-item (i.e., system, subsystem or component) from technical... of any information which discloses design methodology, engineering analysis, detailed process...
22 CFR 124.13 - Procurement by United States persons in foreign countries (offshore procurement).
Code of Federal Regulations, 2010 CFR
2010-04-01
... (build-to-print means producing an end-item (i.e., system, subsystem or component) from technical... of any information which discloses design methodology, engineering analysis, detailed process...
22 CFR 124.13 - Procurement by United States persons in foreign countries (offshore procurement).
Code of Federal Regulations, 2013 CFR
2013-04-01
... (build-to-print means producing an end-item (i.e., system, subsystem or component) from technical... of any information which discloses design methodology, engineering analysis, detailed process...
Design of a high-performance rotary stratified-charge research aircraft engine
NASA Technical Reports Server (NTRS)
Jones, C.; Mount, R. E.
1984-01-01
The power section for an advanced rotary stratified-charge general aviation engine has been designed under contract to NASA. The single-rotor research engine of 40 cubic-inches displacement (RCI-40), now being procured for test initiation this summer, is targeted for 320 T.O. horse-power in a two-rotor production engine. The research engine is designed for operating on jet-fuel, gasoline or diesel fuel and will be used to explore applicable advanced technologies and to optimize high output performance variables. Design of major components of the engine is described in this paper.
Ventilation planning at Energy West's Deer Creek mine
DOE Office of Scientific and Technical Information (OSTI.GOV)
Tonc, L.; Prosser, B.; Gamble, G.
2009-08-15
In 2004 ventilation planning was initiated to exploit a remote area of Deer Creek mine's reserve (near Huntington, Utah), the Mill Fork Area, located under a mountain. A push-pull ventilation system was selected. This article details the design process of the ventilation system upgrade, the procurement process for the new fans, and the new fan startup testing. 5 figs., 1 photo.
Flat-plate solar array project. Volume 6: Engineering sciences and reliability
NASA Technical Reports Server (NTRS)
Ross, R. G., Jr.; Smokler, M. I.
1986-01-01
The Flat-Plate Solar Array (FSA) Project activities directed at developing the engineering technology base required to achieve modules that meet the functional, safety, and reliability requirements of large scale terrestrial photovoltaic systems applications are reported. These activities included: (1) development of functional, safety, and reliability requirements for such applications; (2) development of the engineering analytical approaches, test techniques, and design solutions required to meet the requirements; (3) synthesis and procurement of candidate designs for test and evaluation; and (4) performance of extensive testing, evaluation, and failure analysis of define design shortfalls and, thus, areas requiring additional research and development. A summary of the approach and technical outcome of these activities are provided along with a complete bibliography of the published documentation covering the detailed accomplishments and technologies developed.
Materiel Acquisition Management Guide
1980-02-11
Ii-n manager and his staff, hiqhlighted by the specific de - tails provided in tabbea one-sheet descriptions. • Part III - Areas of Aco-uisition...support program requirements? Support and Test Equipment (S/TE)? Spares Support (SS)? Storage and transportation ? training? o Have test and...PACKAGES PROCUREMENT PLANNING/ PROCUREMENT pLANS TEST AND EVALUATION - PLANNING PRODUCIBILITY ENGINEERING AND TRAINING PLANNING (PEP) TRANSPORTABILITY
DOE Office of Scientific and Technical Information (OSTI.GOV)
Singh, Ravindra; Reilly, James T.; Wang, Jianhui
Electric distribution utilities encounter many challenges to successful deployment of Distribution Management Systems (DMSs). The key challenges are documented in this report, along with suggestions for overcoming them. This report offers a recommended list of activities for implementing a DMS. It takes a strategic approach to implementing DMS from a project management perspective. The project management strategy covers DMS planning, procurement, design, building, testing, Installation, commissioning, and system integration issues and solutions. It identifies the risks that are associated with implementation and suggests strategies for utilities to use to mitigate them or avoid them altogether. Attention is given to commonmore » barriers to successful DMS implementation. This report begins with an overview of the implementation strategy for a DMS and proceeds to put forward a basic approach for procuring hardware and software for a DMS; designing the interfaces with external corporate computing systems such as EMS, GIS, OMS, and AMI; and implementing a complete solution.« less
Investigate zero-stress replicated optics
NASA Technical Reports Server (NTRS)
Engelhaupt, Darell; Rood, Robert
1993-01-01
The contracted activities for the procurement of 'Investigate Zero-Stress Replicated Optics' to support the AXAF-S x-ray spectrometer mirrors has been completed. To date four large Wolter I grazing incidence x-ray optical shells have been electroformed from nickel. The mirrors were fabricated utilizing each of two nickel alloy plated aluminum substrates twice. A wide variety of testing has been completed by NASA MSFC and UAH. This testing includes heat treatment control tests, subscale plating and fixture testing, alloy control of the electroless nickel, adhesion and release testing of the gold to electroless nickel, electroforming instrumentation and software and fabrication of subscale models. The full scale shells are one millimeter thick nickel electrodeposited over a thin gold layer which in turn has the optical surface on the inside. The optical surface is the replicate of the surface prepared on the substrate. Appendix I briefly outlines the fabrication process. Major objectives which were shared by UAH and MSFC include the design of facilities, equipment and tooling and procurement of materials and equipment. Process development followed with the fabrication of small scale pilot units. Procurement commenced immediately and equipment and materials were ordered to implement the fabrication of first surface full scale substrates (mandrels) and the second surface electroformed optical components. All principal objectives have been achieved. Inspection of the mirrors in visible and x-ray modes validates that the required performance and the quality can be achieved by an electroforming replication process. A very distinct progressive improvement has been achieved with each of the four mirrors produced. The final mirror exceeded the original goals and set an improved standard for flight hardware. The future goal of a 30 arc second resolution at 8 KEV x-ray appears to be achievable by this process when proper cleanliness and process control is utilized.
Portable device technology in organ donation: new "app" for procurement coordinators.
Cavallin, M; Bertini, P; Lopane, P; Guarracino, F
2014-09-01
Portable devices are commonly used at bedside in everyday practice. Transplant procurement coordinators routinely have to deal with protocols and flow charts and need to assess the donor condition several times. In our experience, a great part of the organ procurement management work is provided by nurses "on call." We developed an application for iOS devices to facilitate their approach to relatives and procedures for organ donation. The application, which includes algorithms, tutorials, and simple calculators, has been designed by transplant procurement coordinators to speed up the process of organ donation and at the same time to be as accurate as possible for the process. It can be used alongside all of the procedures for procurement in the emergency room, intensive care unit, operating room, and morgue in both brainstem-dead and cadaver organ donors. The application could be effective in organ procurement management for everyday practice. Copyright © 2014 Elsevier Inc. All rights reserved.
Identifying Potential Ventilator Auto-Triggering Among Organ Procurement Organization Referrals.
Henry, Nicholas R; Russian, Christopher J; Nespral, Joseph
2016-06-01
Ventilator auto-trigger is the delivery of an assisted mechanical ventilated breath over the set ventilator frequency in the absence of a spontaneous inspiratory effort and can be caused by inappropriate ventilator trigger sensitivity. Ventilator auto-trigger can be misinterpreted as a spontaneous breath and has the potential to delay or prevent brain death testing and confuse health-care professionals and/or patient families. To determine the frequency of organ donor referrals from 1 Organ Procurement Organization (OPO) that could benefit from an algorithm designed to assist organ recovery coordinators to identify and correct ventilator auto-triggering. This retrospective analysis evaluated documentation of organ donor referrals from 1 OPO in central Texas during the 2013 calendar year that resulted in the withdrawal of care by the patient's family and the recovery of organs. The frequency of referrals that presented with absent brain stem reflexes except for additional respirations over the set ventilator rate was determined to assess for the need of the proposed algorithm. Documentation of 672 organ procurement organization referrals was evaluated. Documentation from 42 referrals that resulted in the withdrawal of care and 21 referrals that resulted in the recovery of organs were identified with absent brain stem reflexes except for spontaneous respirations on the mechanical ventilator. As a result, an algorithm designed to identify and correct ventilator auto-trigger could have been used 63 times during the 2013 calendar year. © 2016, NATCO.
NASA Technical Reports Server (NTRS)
Taylor, Robert M.; Macleod, Iain S.
1994-01-01
This paper is based on the experience of engineering psychologists advising the U.K. Ministry of Defense (MoD) on the procurement of advanced aviation systems that conform to good human engineering (HE) practice. Traditional approaches to HE in systems procurement focus on the physical nature of the human-machine interface. Advanced aviation systems present increasingly complex design requirements for human functional integration, information processing, and cognitive task performance effectiveness. These developing requirements present new challenges for HE quality assurance (QA) and risk management, requiring focus on design processes as well as on design content or product. A new approach to the application of HE, recently adopted by NATO, provides more systematic ordering and control of HE processes and activities to meet the challenges of advanced aircrew systems design. This systematic approach to HE has been applied by MoD to the procurement of mission systems for the Royal Navy Merlin helicopter. In MoD procurement, certification is a judicial function, essentially independent of the service customer and industry contractor. Certification decisions are based on advice from MoD's appointed Acceptance Agency. Test and evaluation (T&E) conducted by the contractor and by the Acceptance Agency provide evidence for certification. Certification identifies limitations of systems upon release to the service. Evidence of compliance with HE standards traditionally forms the main basis of HE certification and significant non-compliance could restrict release. The systems HE approach shows concern for the quality of processes as well as for the content of the product. Human factors certification should be concerned with the quality of HE processes as well as products. Certification should require proof of process as well as proof of content and performance. QA criteria such as completeness, consistency, timeliness, and compatibility provide generic guidelines for progressive acceptance and certification of HE processes. Threats to the validity of certification arise from problems and assumptions in T&E methods. T&E should seek to reduce the risk of specification non-compliance and certification failure.
An Overview of Follow-On Testing Activities of the A-3 Subscale Diffuser Test Project
NASA Technical Reports Server (NTRS)
Ryan, James E.
2009-01-01
An overview of NASA Stennis Space Center's (SSC) A-3 Subscale Diffuser Test (SDT) Project is presented. The original scope of the SDT Project, conducted from April 2007 to January 2008, collected data to support mitigation of risk associated with design and procurement activities of the A-3 Test Stand Project, an effort to construct a simulated altitude test facility at SSC in support of NASA's Constellation Program. Follow-on tests were conducted from May 2008 through August 2009, utilizing the SDT test setup as a testbed for additional risk mitigation activities. Included are descriptions of the Subscale Diffuser (SD) test article, the test facility configuration, and test approaches.
ITER Construction—Plant System Integration
NASA Astrophysics Data System (ADS)
Tada, E.; Matsuda, S.
2009-02-01
This brief paper introduces how the ITER will be built in the international collaboration. The ITER Organization plays a central role in constructing ITER and leading it into operation. Since most of the ITER components are to be provided in-kind from the member countries, integral project management should be scoped in advance of real work. Those include design, procurement, system assembly, testing, licensing and commissioning of ITER.
Cell module and fuel conditioner development
NASA Astrophysics Data System (ADS)
Hoover, D. Q., Jr.
1980-01-01
Components for the first 5 cell stack (no cooling plates) of the MK-2 design were fabricated. Preliminary specfications and designs for the components of a 23 cell MK-1 stack with four DIGAS cooling plates were developed. The MK-2 was selected as a bench mark design and a preliminary design of the facilities required for high rate manufacture of fuel cell modules was developed. Two stands for testing 5 cell stacks were built and design work for modifying existing stands and building new stands for 23 and 80 cell stacks was initiated. Design and procurement of components and materials for the catalyst test stand were completed and construction initiated. Work on the specifications of pipeline gas, tap water and recovered water and definition of equipment required for treatment was initiated. An innovative geometry for the reformer was conceived and modifications of the computer program to be used in its design were stated.
Intelligent Engine Systems: Bearing System
NASA Technical Reports Server (NTRS)
Singh, Arnant P.
2008-01-01
The overall requirements necessary for sensing bearing distress and the related criteria to select a particular rotating sensor were established during the phase I. The current phase II efforts performed studies to evaluate the Robustness and Durability Enhancement of the rotating sensors, and to design, and develop the Built-in Telemetry System concepts for an aircraft engine differential sump. A generic test vehicle that can test the proposed bearing diagnostic system was designed, developed, and built. The Timken Company, who also assisted with testing the GE concept of using rotating sensors for the differential bearing diagnostics during previous phase, was selected as a subcontractor to assist General Electric (GE) for the design, and procurement of the test vehicle. A purchase order was prepared to define the different sub-tasks, and deliverables for this task. The University of Akron was selected to provide the necessary support for installing, and integrating the test vehicle with their newly designed test facility capable of simulating the operating environment for the planned testing. The planned testing with good and damaged bearings will be on hold pending further continuation of this effort during next phase.
Long life valve design concepts
NASA Technical Reports Server (NTRS)
Jones, J. R.; Hall, A. H., Jr.
1975-01-01
Valve concept evaluation, final candidate selection, design, manufacture, and demonstration testing of a pneumatically actuated 10-inch hybrid poppet butterfly shutoff valve are presented. Conclusions and recommendations regarding those valve characteristics and features which would serve to guide in the formulation of future valve procurements are discussed. The pertinent design goals were temperature range of plus 200 to minus 423 F, valve inlet pressure 35 psia, actuation pressure 750 psia, main seal leakage 3 x 0.00001 sccs at 35 psia valve inlet pressure, and a storage and operating life of 10 years. The valve was designed to be compatible with RP-1, propane, LH2, LO2, He, and N2.
Industrial application experiment series
NASA Technical Reports Server (NTRS)
Bluhm, S. A.
1981-01-01
Two procurements within the Industrial Application Experiment Series of the Thermal Power Systems Project are discussed. The first procurement, initiated in April 1980, resulted in an award to the Applied Concepts Corporation for the Capital Concrete Experiment: two Fresnel concentrating collectors will be evaluated in single-unit installations at the Jet Propulsion Laboratory Parabolic Dish Test Site and at Capitol Concrete Products, Topeka, Kansas. The second procurement, initiated in March 1981, is titled, "Thermal System Engineering Experiment B." The objective of the procurement is the rapid deployment of developed parabolic dish collectors.
Tyllinen, Mari; Kaipio, Johanna; Lääveri, Tinja; Nieminen, Marko
2017-01-01
This paper describes the development of a questionnaire for evaluating usability during EHR system procurement (DPUQ). Established usability questionnaires can be used to gather user feedback after using the systems. However, during procurement, experimenting with real system use is practical only with a limited number of system candidates. There is a need for less resource-demanding usability evaluation in the early stages of procurement in cases with several vendors. DPUQ has been designed for usability evaluation by end-users during special scenario-based vendor demonstrations. The questionnaire includes three sets of questions to be used during and after the vendor demonstration. DPUQ delivers specific usability scores and can be used to compare system candidates in procurement complementing other evaluation methods.
ProCure21+ should speed scheme starts.
Baillie, Jonathan
2010-11-01
This October saw the launch of the new ProCure21+ National Framework under which, the Department of Health (DH) team behind the new scheme claims, the NHS can potentially save a further pound 200 million of public money on top of the substantial sums saved under predecessor, ProCure21, via faster, more streamlined procurement, design, planning, and construction, of publicly-funded healthcare schemes. HEJ editor Jonathan Baillie discussed, with the DH's senior responsible officer (SRO) and P21+ team leader Peter Sellars, the background to the new Framework's introduction, the success of its forerunner, and the additional benefits that ProCure21 + (which is backed by organisations incuding HM Treasury, the National Audit Office, and the Office of Government Commerce) should bring to the entire healthcare building supply chain.
Subscale Diffuser Testing, E-3 produces first steam
2007-10-25
Phase 2 of the A-3 Test Facility Subscale Diffuser Risk Mitigation Project at Stennis Space Center reached a milestone Oct. 25 when the E-3 Test Facility produced superheated (500+ degrees) steam for approximately 3 seconds at more than 400 psi. The test team, led by Barry Robinson of NASA's Test Projects Office, followed that success with further tests to lengthen the duration of steam production. On Nov. 1, they were able to maintain a consistent pressure and temperature of steam for 60 seconds. In December, the team began Phase 3 of the testing, providing data for the design and procurement to build the full-scale version of the steam diffuser for SSC's A-3 Test Stand.
Subscale Diffuser Testing, E-3 produces first steam
NASA Technical Reports Server (NTRS)
2007-01-01
Phase 2 of the A-3 Test Facility Subscale Diffuser Risk Mitigation Project at Stennis Space Center reached a milestone Oct. 25 when the E-3 Test Facility produced superheated (500+ degrees) steam for approximately 3 seconds at more than 400 psi. The test team, led by Barry Robinson of NASA's Test Projects Office, followed that success with further tests to lengthen the duration of steam production. On Nov. 1, they were able to maintain a consistent pressure and temperature of steam for 60 seconds. In December, the team began Phase 3 of the testing, providing data for the design and procurement to build the full-scale version of the steam diffuser for SSC's A-3 Test Stand.
Contracting for Efficiency. A Best Practices Guide for Energy-Efficient Product Procurement
DOE Office of Scientific and Technical Information (OSTI.GOV)
Bunch, Saralyn; Payne, Christopher
2016-04-01
The requirement to buy energy- and water-efficient products applies to federal purchases made through any procurement pathway (e.g., purchase cards, e-retailers, and solicitations) and to a wide variety of federal projects. The Federal Energy Management Program’s (FEMP's) Buy Energy-Efficient Products buyer overview fact sheet and Contracting for Efficiency best practices guide for product procurement are designed to support federal buyers in the purchase of energy- and water-efficient products.
Contracting for Efficiency: A Best Practices Guide for Energy Efficient Product Procurement
DOE Office of Scientific and Technical Information (OSTI.GOV)
Bunch, Saralyn; Payne, Christopher
The requirement to buy energy- and water-efficient products applies to federal purchases made through any procurement pathway (e.g., purchase cards, e-retailers, and solicitations) and to a wide variety of federal projects. The Federal Energy Management Program’s (FEMP's) Buy Energy-Efficient Products buyer overview fact sheet and Contracting for Efficiency best practices guide for product procurement are designed to support federal buyers in the purchase of energy- and water-efficient products.
7 CFR 2902.4 - Procurement programs.
Code of Federal Regulations, 2011 CFR
2011-01-01
... Agriculture Regulations of the Department of Agriculture (Continued) OFFICE OF ENERGY POLICY AND NEW USES... Federal Procurement Policy, in cooperation with USDA, has the responsibility to coordinate this policy's... policy of awarding contracts to the vendor offering a designated item composed of the highest percentage...
7 CFR 2902.4 - Procurement programs.
Code of Federal Regulations, 2010 CFR
2010-01-01
... Agriculture Regulations of the Department of Agriculture (Continued) OFFICE OF ENERGY POLICY AND NEW USES... Federal Procurement Policy, in cooperation with USDA, has the responsibility to coordinate this policy's... policy of awarding contracts to the vendor offering a designated item composed of the highest percentage...
Space shuttle low cost/risk avionics study
NASA Technical Reports Server (NTRS)
1971-01-01
All work breakdown structure elements containing any avionics related effort were examined for pricing the life cycle costs. The analytical, testing, and integration efforts are included for the basic onboard avionics and electrical power systems. The design and procurement of special test equipment and maintenance and repair equipment are considered. Program management associated with these efforts is described. Flight test spares and labor and materials associated with the operations and maintenance of the avionics systems throughout the horizontal flight test are examined. It was determined that cost savings can be achieved by using existing hardware, maximizing orbiter-booster commonality, specifying new equipments to MIL quality standards, basing redundancy on cost effective analysis, minimizing software complexity and reducing cross strapping and computer-managed functions, utilizing compilers and floating point computers, and evolving the design as dictated by the horizontal flight test schedules.
Pooling procurement in the Belgian hospital sector.
Hebert, Guy
2011-01-01
The Belgian hospital sector is following the example of a number of other European countries and for more than ten years now, has been striving to pool its medical supplies and equipment purchases in a bid to reduce costs. The various experiments of which we are aware come under both opportunist purchases and initiatives which are designed to encourage local-regional contracts. These attempts have now all come to nothing or are struggling in the absence of a structured and professional approach. In 2005, the Saint Luc University Clinic in Brussels decided to set up a high-performance purchasing department, the aim being to centre its initiatives around TCO or Total Cost of Ownership. Following an analysis of the various experiments into pooling procurement in hospitals in Europe, the Saint Luc University Clinic decided on a central procurement agency model, in accordance with new legislation on public procurement. This article seeks to highlight the prerequisites which are vital for a procurement pooling initiative, without underestimating the risks and limitations of implementing such a change in procurement practices. The Mercure central procurement agency is now the largest interhospital purchasing structure in Belgium.
Thrailkill, Eric A.; Bouton, Mark E.
2015-01-01
Instrumental behavior often consists of sequences or chains of responses that minimally include procurement behaviors that enable subsequent consumption behaviors. In such chains, behavioral units are linked by access to one another and eventually to a primary reinforcer, such as food or a drug. The present experiments examined the effects of extinguishing procurement responding on consumption responding after training of a discriminated heterogeneous instrumental chain. Rats learned to make a procurement response (e.g., pressing a lever) in the presence of a distinctive discriminative stimulus; making that response led to the presentation of a second discriminative stimulus that set the occasion for a consumption response (e.g., pulling a chain), which then produced a food-pellet reinforcer. Experiment 1 showed that extinction of either the full procurement-consumption chain or procurement alone weakened the consumption response tested in isolation. Experiment 2 replicated the procurement extinction effect and further demonstrated that the opportunity to make the procurement response, as opposed to simple exposure to the procurement stimulus alone, was required. In Experiment 3, rats learned 2 distinct discriminated heterogeneous chains; extinction of 1 procurement response specifically weakened the consumption response that had been associated with it. The results suggest that learning to inhibit the procurement response may produce extinction of consumption responding through mediated extinction. The experiments suggest the importance of an associative analysis of instrumental behavior chains. PMID:25915751
Energy-efficient Public Procurement: Best Practice in Program Delivery
DOE Office of Scientific and Technical Information (OSTI.GOV)
Payne, Christopher; Weber, Andrew; Semple, Abby
2013-02-15
This document illustrates the key issues and considerations involved in implementing energy-efficient public procurement. Our primary sources of information have been our partners in the Super Efficient Equipment and Appliance Deployment (SEAD) Initiative Procurement Working Group. Where applicable, we have highlighted specific ways in which working group participants have successfully overcome barriers to delivering effective programs. The following key points emerge from this analysis of programs for energy-efficient public procurement. Lessons for both developed and developing programs are highlighted throughout the guide. 1. Policy: Policy provides the initiative to begin a transition from first cost to life-cycle cost based purchasingmore » methods and culture. Effective policy is well-communicated, establishes accountability from top to bottom of organizations and simplifies the processes necessary to comply. Flexibility and responsiveness are essential in policy development and implementation. Mandatory and voluntary policies may complement one another. 2. Procurement Criteria: Procurement staff must be confident that energy-efficient procurement criteria offer the best long-term value for their organization’s money and represent real environmental gains. Involving multiple stakeholders at the early stages of the criteria creation process can result in greater levels of cooperation from private industry. Criteria should make comparison of products easy for purchasers and require minimal additional calculations. Criteria will need to be regularly updated to reflect market developments. 3. Training: Resources for the creation of training programs are usually very limited, but well-targeted training is necessary in order for a program to be effective. Training must emphasize a process that is efficient for purchasers and simplifies compliance. Purchaser resources and policy must be well designed for training to be effective. Training program development is an excellent opportunity for collaboration amongst public authorities. 4. Procurement Processes: Many tools and guides intended to help buyers comply with energy-efficient procurement policy are designed without detailed knowledge of the procurement process. A deeper understanding of purchasing pathways allows resources to be better directed. Current research by national and international bodies aims to analyze purchasing pathways and can assist in developing future resources.« less
Visit from JAXA to NASA MSFC: The Engines Element & Ideas for Collaboration
NASA Technical Reports Server (NTRS)
Greene, William D.
2013-01-01
System Design, Development, and Fabrication: Design, develop, and fabricate or procure MB-60 component hardware compliant with the imposed technical requirements and in sufficient quantities to fulfill the overall MB-60 development effort. System Development, Assembly, and Test: Manage the scope of the development, assembly, and test-related activities for MB-60 development. This scope includes engine-level development planning, engine assembly and disassembly, test planning, engine testing, inspection, anomaly resolution, and development of necessary ground support equipment and special test equipment. System Integration: Provide coordinated integration in the realms of engineering, safety, quality, and manufacturing disciplines across the scope of the MB-60 design and associated products development Safety and Mission Assurance, structural design, fracture control, materials and processes, thermal analysis. Systems Engineering and Analysis: Manage and perform Systems Engineering and Analysis to provide rigor and structure to the overall design and development effort for the MB-60. Milestone reviews, requirements management, system analysis, program management support Program Management: Manage, plan, and coordinate the activities across all portions of the MB-60 work scope by providing direction for program administration, business management, and supplier management.
NASA Technical Reports Server (NTRS)
Abeles, F. J.
1980-01-01
Each of the subsystems comprising the protective ensemble for firefighters is described. These include: (1) the garment system which includes turnout gear, helmets, faceshields, coats, pants, gloves, and boots; (2) the self-contained breathing system; (3) the lighting system; and (4) the communication system. The design selection rationale is discussed and the drawings used to fabricate the prototype ensemble are provided. The specifications presented were developed using the requirements and test method of the protective ensemble standard. Approximate retail prices are listed.
Solar cell array design handbook, volume 1
NASA Technical Reports Server (NTRS)
Rauschenbach, H. S.
1976-01-01
Twelve chapters discuss the following: historical developments, the environment and its effects, solar cells, solar cell filters and covers, solar cell and other electrical interconnections, blocking and shunt diodes, substrates and deployment mechanisms, material properties, design synthesis and optimization, design analysis, procurement, production and cost aspects, evaluation and test, orbital performance, and illustrative design examples. A comprehensive index permits rapid locating of desired topics. The handbook consists of two volumes: Volume 1 is of an expository nature while Volume 2 contains detailed design data in an appendix-like fashion. Volume 2 includes solar cell performance data, applicable unit conversion factors and physical constants, and mechanical, electrical, thermal optical, magnetic, and outgassing material properties. Extensive references are provided.
SMEX-Lite Modular Solar Array Architecture
NASA Technical Reports Server (NTRS)
Lyons, John
2002-01-01
For the most part, Goddard solar arrays have been custom designs that are unique to each mission. The solar panel design has been frozen prior to issuing an RFP for their procurement. There has typically been 6-9 months between RFP release and contract award, followed by an additional 24 months for performance of the contract. For Small Explorer (SMEX) missions, with three years between mission definition and launch, this has been a significant problem. The SMEX solar panels have been sufficiently small that the contract performance period has been reduced to 12-15 months. The bulk of this time is used up in the final design definition and fabrication of flight solar cell assemblies. Even so, it has been virtually impossible to have the spacecraft design at a level of maturity sufficient to freeze the solar panel geometry and release the RFP in time to avoid schedule problems with integrating the solar panels to the spacecraft. With that in mind, the SMEX-Lite project team developed a modular architecture for the assembly of solar arrays to greatly reduce the cost and schedule associated with the development of a mission- specific solar array. In the modular architecture, solar cells are fabricated onto small substrate panels. This modular panel (approximately 8.5" x 17" in this case) becomes the building block for constructing solar arrays for multiple missions with varying power requirements and geometrical arrangements. The mechanical framework that holds these modules together as a solar array is the only mission-unique design, changing in size and shape as required for each mission. There are several advantages to this approach. First, the typical solar array development cycle requires a mission unique design, procurement, and qualification including a custom qualification panel. With the modular architecture, a single qualification of the SMEX-Lite modules and the associated mechanical framework in a typical configuration provided a qualification by similarity to multiple missions. It then becomes possible to procure solar array modules in advance of mission definition and respond quickly and inexpensively to a selected mission's unique requirements. The solar array modular architecture allows the procurement of solar array modules before the array geometry has been frozen. This reduces the effect of procurement lead-time on the mission integration and test flow by as much as 50%. Second, by spreading the non-recurring costs over multiple missions, the cost per unit area is also reduced. In the case of the SMEX-Lite procurement, this reduction was by about one third of the cost per unit area compared to previous SMEX mission-unique procurements. Third, the modular architecture greatly facilitates the infusion of new solar cell technologies into flight programs as these technologies become available. New solar cell technologies need only be fabricated onto a standard-sized module to be incorporated into the next available mission. The modular solar array can be flown in a mixed configuration with some new and some standard cell technologies. Since each module has its own wiring terminals, the array can be arranged as desired electrically with little impact to cost and schedule. The solar array modular architecture does impose some additional constraints on systems and subsystem engineers. First, they must work with discrete solar array modules rather than size the array to fit exactly within an available envelope. The array area is constrained to an integer multiple of the module area. Second, the modular design is optimized for space radiation and thermal environments not greatly different from a typical SMEX LEO environment. For example, a mission with a highly elliptical orbit (e.g., Polar, SMEX/FAST) would require thicker coverglasses to protect the solar cells from the more intense radiation environment.
New Tables For IABG's 320kN Shaker System: Design And Procurement Process
NASA Astrophysics Data System (ADS)
Baumgartl, Ralf
2012-07-01
For more than 25 years IABG is operating its 320kN vibration system in testing of space and non-space applications. The vibration system is a multi shaker system, using four electrodynamic shakers, driving a 3x3m2 head expander and a 3x3m2 slip table. During the recent years a modernisation program of the shaker system has been implemented. The purpose of this program was to exchange system components, which have reached their expected duration of life, as well as to exchange components which did no longer fulfil the state-of-the-art requirements in testing and thus to adapt the vibration system to future challenges. Two major components of the shaker system, which have been covered during the modernisation program, are the shaker tables (the head expander and the slip table). Being the direct interface of a vibration test facility to a specimen, the shaker tables are crucial regarding the shaker system overall performance. And this fact applies even more for shaker systems with large tables, because there are no off-the-shelf solutions in this area. During the recent 5 years IABG specified, designed and procured a new head expander and a new slip table for the 320kN shaker system. This paper describes the overall process investigating on the following listed aspects: - general requirements for the tables - definition of boundary conditions and guidance principles - specific areas of interest - definition of the table material and the manufacturing method - design solutions - challenges during manufacturing - results - table properties
Positional linker effects in haptens for cocaine immunopharmacotherapy.
Ino, Akira; Dickerson, Tobin J; Janda, Kim D
2007-08-01
Cocaine use remains a serious problem, despite intensive efforts to curb abuse. Given the lack of effective pharmacotherapeutics for the treatment of cocaine addiction, research groups have targeted immunopharmacotherapy in which the drug user's immune system is trained to recognize and remove cocaine prior to entry into the central nervous system. Antibody cocaine esterases and simple binders have been procured, however, rates and/or affinities still need improvement before clinical trials are warranted. Herein, we report the synthesis and testing of two new haptens for the procurement of cocaine binding antibodies and cocaine esterase catalytic antibodies. Central in the design of these haptens was the placement of the linker functionality distal from the anticipated cocaine epitopes in an attempt to bury the hapten deep within an antibody combining site to gain possible entropic and enthalpic advantages.
7 CFR 2902.3 - Applicability to Federal procurements.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 7 Agriculture 15 2011-01-01 2011-01-01 false Applicability to Federal procurements. 2902.3 Section 2902.3 Agriculture Regulations of the Department of Agriculture (Continued) OFFICE OF ENERGY POLICY AND NEW USES, DEPARTMENT OF AGRICULTURE GUIDELINES FOR DESIGNATING BIOBASED PRODUCTS FOR FEDERAL...
7 CFR 2902.3 - Applicability to Federal procurements.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 7 Agriculture 15 2010-01-01 2010-01-01 false Applicability to Federal procurements. 2902.3 Section 2902.3 Agriculture Regulations of the Department of Agriculture (Continued) OFFICE OF ENERGY POLICY AND NEW USES, DEPARTMENT OF AGRICULTURE GUIDELINES FOR DESIGNATING BIOBASED PRODUCTS FOR FEDERAL...
DOD-Wide Civilian Career Program for Procurement Personnel.
ERIC Educational Resources Information Center
Office of the Assistant Secretary of Defense for Manpower and Reserve Affairs (DOD), Washington, DC.
The manual, which supersedes the August 4, 1966 manual, is designed to aid in program improvement for career development and advancement opportunities of Department of Defense (DOD) civilian procurement personnel. Program elements covered include: career patterns, career counseling and appraisal, training and development, registration, referral…
DOT National Transportation Integrated Search
2000-03-01
Procurement of Intelligent Transportation System (ITS) projects using Federal-aid funds can present challenges that are not typically observed in traditional transportation projects. Many roadway improvement projects involve the two-step "Design-Bid-...
DSN Aperture Enhancement Project Office
NASA Technical Reports Server (NTRS)
Marina, Miguel
2012-01-01
All contracts are underway for antennas, associated facilities modifications and new transmitters. High risk CPI 100kW klystron and JPL high power uplink microwave components have been designed, prototyped and successfully tested at GDSCC to support the 80kW transmitter implementation and testing at vendor facility. Open issues, which might affect project delivery date, have plans in place or are being created, to maintain DSS-35 Operational Date. There are no known open issues that affect performance. Overall good progress has been made in all areas (procurements, contracts, design and development) and the project is confident that DSS-35 & 36 antennas and the three 80kW Uplink systems will be delivered according to plan.
Critical analysis of procurement techniques in construction management sectors
NASA Astrophysics Data System (ADS)
Tiwari, Suman Tiwari Suresh; Chan, Shiau Wei; Faraz Mubarak, Muhammad
2018-04-01
Over the last three decades, numerous procurement techniques have been one of the highlights of the Construction Management (CM) for ventures, administration contracting, venture management as well as design and construct. Due to the development and utilization of those techniques, various researchers have explored the criteria for their choice and their execution in terms of time, cost and quality. Nevertheless, there is a lack of giving an account on the relationship between the procurement techniques and the progressed related issues, for example, supply chain, sustainability, innovation and technology development, lean construction, constructability, value management, Building Information Modelling (BIM) as well as e-procurement. Through chosen papers from the reputable CM-related academic journals, the specified scopes of these issues are methodically assessed with the objective to explore the status and trend in procurement related research. The result of this paper contributes theoretically as well as practically to the researchers and industrialist in order to be aware and appreciate the development of procurement techniques.
Use of Commercial ’Off-the-Shelf’ Equipment in Military Aircraft
1976-05-01
never been intended as a procurement document. The airline industry benefits from the standarization of equipment. Aeronautical Radio Inc. (ARINC) is...are not intended for nor are they suitable for use as procurement specifications. 2. Airframe manufacturers and commercial airlines purchase avionics...may be suitable for military procurements but a careful review must be made to ensure that the performance and environmental testing specified is
Brush seals for turbine engine fuel conservation
NASA Astrophysics Data System (ADS)
Sousa, Mike
1994-07-01
The program objective is to demonstrate brush seals for replacing labyrinth seals in turboprop engines. The approach taken was to design and procure brush seals with assistance from Sealol, modify and instrument an existing T407 low pressure turbine test rig, replace inner balance piston and outer balance piston labyrinth seals with brush seals, conduct cyclic tests to evaluate seal leakage at operating pressures and temperatures, and evaluate effect of seal pack width and rotor eccentricity. Results are presented in viewgraph format and show that brush seals offer performance advantages over labyrinth seals.
Design the price signal mechanism of suppliers' cost in the commercial procurement process
NASA Astrophysics Data System (ADS)
Jinming, Huang; Wenjing, Li; Huazhen, Zhu
2016-06-01
In the process of commercial procurement, there exists information asymmetry between purchasers and suppliers in terms of commodity cost. The strike price is what purchasers care about, while the focus of suppliers is only the sales revenue. In order to achieve the relatively lower strike price, purchasers need to design a price signal mechanism, explicating the commodity cost of suppliers. In this article, we have designed a mechanism that purchasers can explicit the commodity cost price based on suppliers' choices by providing a variety of purchase contracts to suppliers.
7 CFR 3201.75 - Air fresheners and deodorizers.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 7 Agriculture 15 2013-01-01 2013-01-01 false Air fresheners and deodorizers. 3201.75 Section 3201... PROCUREMENT Designated Items § 3201.75 Air fresheners and deodorizers. (a) Definition. Products used to... this part, will give a procurement preference for qualifying biobased air fresheners and deodorizers...
48 CFR 903.104-7 - Violations or possible violations.
Code of Federal Regulations, 2010 CFR
2010-10-01
... violation or possible violation of subsections 27 (a), (b), (c) or (d) of the Office of Federal Procurement... disclosure of proprietary or source selection information is the Assistant General Counsel for Procurement...) and (2) for Headquarters activities is the Agency Ethics Official (Designated Agency Ethics Official...
Arizona TeleMedicine Network: System Procurement Specifications, Phase 1.
ERIC Educational Resources Information Center
Atlantic Research Corp., Alexandria, VA.
Defining the system procurement specifications for a telecommunications system designed to provide health services to rurally isolated American Indians living on reservations in Arizona, this document presents detailed specifications for: (1) a complete communications facility; (2) a mobile health communications treatment and diagnosis unit; (3)…
75 FR 71491 - Designation of Biobased Items for Federal Procurement
Federal Register 2010, 2011, 2012, 2013, 2014
2010-11-23
... shipping containers. USDA is also proposing minimum biobased contents for each of these items. DATES: USDA... availability. USDA recognizes that the performance needs for a given application are important criteria in... information to procuring agencies on the availability, relative price, performance, and environmental and...
7 CFR 3201.53 - Expanded polystyrene (EPS) foam recycling products.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 7 Agriculture 15 2014-01-01 2014-01-01 false Expanded polystyrene (EPS) foam recycling products... FOR FEDERAL PROCUREMENT Designated Items § 3201.53 Expanded polystyrene (EPS) foam recycling products... with this part, will give a procurement preference for qualifying biobased EPS foam recycling products...
7 CFR 3201.53 - Expanded polystyrene (EPS) foam recycling products.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 7 Agriculture 15 2012-01-01 2012-01-01 false Expanded polystyrene (EPS) foam recycling products... FOR FEDERAL PROCUREMENT Designated Items § 3201.53 Expanded polystyrene (EPS) foam recycling products... with this part, will give a procurement preference for qualifying biobased EPS foam recycling products...
7 CFR 2902.53 - Expanded polystyrene (EPS) foam recycling products.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 7 Agriculture 15 2011-01-01 2011-01-01 false Expanded polystyrene (EPS) foam recycling products... FEDERAL PROCUREMENT Designated Items § 2902.53 Expanded polystyrene (EPS) foam recycling products. (a..., will give a procurement preference for qualifying biobased EPS foam recycling products. By that date...
7 CFR 3201.53 - Expanded polystyrene (EPS) foam recycling products.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 7 Agriculture 15 2013-01-01 2013-01-01 false Expanded polystyrene (EPS) foam recycling products... FOR FEDERAL PROCUREMENT Designated Items § 3201.53 Expanded polystyrene (EPS) foam recycling products... with this part, will give a procurement preference for qualifying biobased EPS foam recycling products...
77 FR 33269 - Designation of Product Categories for Federal Procurement
Federal Register 2010, 2011, 2012, 2013, 2014
2012-06-05
... under such a contract.'' Thus, Federal contractors, as well as Federal agencies, are expressly subject... generally to procure such a product composed of the highest percentage of recovered materials content... those product categories that contain the highest biobased content. In addition, as the program matures...
A case study : Chart II software upgrade, using a design competition to procure ITS software
DOT National Transportation Integrated Search
2000-03-01
This is one of a series of case studies that examine procurement approaches used to deliver Intelligent Transportation System (ITS) projects. The purpose of these reports is to provide examples of successful strategies that have been used to overcome...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-08-30
... redelegate authority for simplified acquisitions using the Government Purchase Card. Under prior notices, the... Administrator authority for credit card purchases within the micro-purchase threshold established in Federal... the establishment of educational, training, and experience requirements for procurement personnel; and...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-10-16
... Testing 11. Buy America 12. Corridor Preservation 13. Rail Car Procurements 14. Veterans Preference... transit assistance; to conduct State Safety Oversight, drug and alcohol, civil rights, procurement systems...
Statistical analysis of the Nb3Sn strand production for the ITER toroidal field coils
NASA Astrophysics Data System (ADS)
Vostner, A.; Jewell, M.; Pong, I.; Sullivan, N.; Devred, A.; Bessette, D.; Bevillard, G.; Mitchell, N.; Romano, G.; Zhou, C.
2017-04-01
The ITER toroidal field (TF) strand procurement initiated the largest Nb3Sn superconducting strand production hitherto. The industrial-scale production started in Japan in 2008 and finished in summer 2015. Six ITER partners (so-called Domestic Agencies, or DAs) are in charge of the procurement and involved eight different strand suppliers all over the world, of which four are using the bronze route (BR) process and four the internal-tin (IT) process. In total more than 500 tons have been produced including excess material covering losses during the conductor manufacturing process, in particular the cabling. The procurement is based on a functional specification where the main strand requirements like critical current, hysteresis losses, Cu ratio and residual resistance ratio are specified but not the strand production process or layout. This paper presents the analysis on the data acquired during the quality control (QC) process that was carried out to ensure the same conductor performance requirements are met by the different strand suppliers regardless of strand design. The strand QC is based on 100% billet testing and on applying statistical process control (SPC) limits. Throughout the production, samples adjacent to the strand pieces tested by the suppliers are cross-checked (‘verified’) by their respective DAs reference labs. The level of verification was lowered from 100% at the beginning of the procurement progressively to approximately 25% during the final phase of production. Based on the complete dataset of the TF strand production, an analysis of the SPC limits of the critical strand parameters is made and the related process capability indices are calculated. In view of the large-scale production and costs, key manufacturing parameters such as billet yield, number of breakages and piece-length distribution are also discussed. The results are compared among all the strand suppliers, focusing on the difference between BR and IT processes. Following the completion of the largest Nb3Sn strand production, our experience gained from monitoring the execution of the QC activities and from auditing the results from the measurements is summarised for future superconducting strand material procurement activities.
Ajayi, Saheed O; Oyedele, Lukumon O
2018-05-01
Albeit the understanding that construction waste is caused by activities ranging from all stages of project delivery process, research efforts have been concentrated on design and construction stages, while the possibility of reducing waste through materials procurement process is widely neglected. This study aims at exploring and confirming strategies for achieving waste-efficient materials procurement in construction activities. The study employs sequential exploratory mixed method approach as its methodological framework, using focus group discussion, statistical analysis and structural equation modelling. The study suggests that for materials procurement to enhance waste minimisation in construction projects, the procurement process would be characterised by four features. These include suppliers' commitment to low waste measures, low waste purchase management, effective materials delivery management and waste-efficient Bill of Quantity, all of which have significant impacts on waste minimisation. This implies that commitment of materials suppliers to such measures as take back scheme and flexibility in supplying small materials quantity, among others, are expected of materials procurement. While low waste purchase management stipulates the need for such measures as reduced packaging and consideration of pre-assembled/pre-cut materials, efficient delivery management entails effective delivery and storage system as well as adequate protection of materials during the delivery process, among others. Waste-efficient specification and bill of quantity, on the other hand, requires accurate materials take-off and ordering of materials based on accurately prepared design documents and bill of quantity. Findings of this study could assist in understanding a set of measures that should be taken during materials procurement process, thereby corroborating waste management practices at other stages of project delivery process. Copyright © 2018. Published by Elsevier Ltd.
78 FR 45182 - Clarification of Sourcing Requirements for the Procurement List
Federal Register 2010, 2011, 2012, 2013, 2014
2013-07-26
...) 4140.1-R, DoD Supply Chain Materiel Management Regulation, the AbilityOne Program is designating the... Defense and the General Services Administration Governing Supply Management Relationships Under the National Supply System provides DLA the authority to procure and supply certain assigned products for the...
13 CFR 305.6 - Allowable methods of procurement for construction services.
Code of Federal Regulations, 2013 CFR
2013-01-01
... design/build, construction management at risk and force account. If an alternate method is used, the... for construction services. 305.6 Section 305.6 Business Credit and Assistance ECONOMIC DEVELOPMENT... Approved Projects § 305.6 Allowable methods of procurement for construction services. (a) Recipients may...
13 CFR 305.6 - Allowable methods of procurement for construction services.
Code of Federal Regulations, 2012 CFR
2012-01-01
... design/build, construction management at risk and force account. If an alternate method is used, the... for construction services. 305.6 Section 305.6 Business Credit and Assistance ECONOMIC DEVELOPMENT... Approved Projects § 305.6 Allowable methods of procurement for construction services. (a) Recipients may...
13 CFR 305.6 - Allowable methods of procurement for construction services.
Code of Federal Regulations, 2014 CFR
2014-01-01
... design/build, construction management at risk and force account. If an alternate method is used, the... for construction services. 305.6 Section 305.6 Business Credit and Assistance ECONOMIC DEVELOPMENT... Approved Projects § 305.6 Allowable methods of procurement for construction services. (a) Recipients may...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-09-29
... Executive Director) the functions of prescribing procurement regulations, entering into contracts, designating contracting officers, and making procurement determinations. We believe it is appropriate to...: PART 200--ORGANIZATION; CONDUCT AND ETHICS; AND INFORMATION AND REQUESTS Subpart A--Organization and...
Code of Federal Regulations, 2011 CFR
2011-10-01
... donors and organ placement and recovery. 486.344 Section 486.344 Public Health CENTERS FOR MEDICARE... Designation and Conditions for Coverage: Organ Procurement Organizations Organ Procurement Organization... placement and recovery. The OPO must have written protocols for donor evaluation and management and organ...
Code of Federal Regulations, 2010 CFR
2010-10-01
... donors and organ placement and recovery. 486.344 Section 486.344 Public Health CENTERS FOR MEDICARE... Designation and Conditions for Coverage: Organ Procurement Organizations Organ Procurement Organization... placement and recovery. The OPO must have written protocols for donor evaluation and management and organ...
Code of Federal Regulations, 2011 CFR
2011-07-01
... person who was solicited to the office designated by the installation commander on the back of the...) Procuring, attempting to procure, supplying, or attempting to supply non-public listings of DoD personnel... footnote 1 to § 50.3. (13) Soliciting door to door or without an appointment. (14) Unauthorized advertising...
Code of Federal Regulations, 2014 CFR
2014-07-01
... person who was solicited to the office designated by the installation commander on the back of the...) Procuring, attempting to procure, supplying, or attempting to supply non-public listings of DoD personnel... footnote 1 to § 50.3. (13) Soliciting door to door or without an appointment. (14) Unauthorized advertising...
Code of Federal Regulations, 2010 CFR
2010-07-01
... person who was solicited to the office designated by the installation commander on the back of the...) Procuring, attempting to procure, supplying, or attempting to supply non-public listings of DoD personnel... footnote 1 to § 50.3. (13) Soliciting door to door or without an appointment. (14) Unauthorized advertising...
Code of Federal Regulations, 2010 CFR
2010-10-01
... PROCUREMENT AND TRANSPLANTATION NETWORK § 121.2 Definitions. As used in this part— Act means the Public Health... means an entity so designated by the Secretary under section 1138(b) of the Social Security Act. Organ procurement and transplantation network or OPTN means the network established pursuant to section 372 of the...
Procurement of a fully licensed radioisotope thermoelectric generator transportation system
NASA Astrophysics Data System (ADS)
Adkins, Harold E.; Bearden, Thomas E.
The present transportation system for radioisotope thermoelectric generators and heater units is being developed to comply with all applicable U.S. DOT regulations, including a doubly-contained 'bell jar' concept for the required double-containment of plutonium. Modifications in handling equipment and procedures are entailed by this novel packaging design, and will affect high-capacity forklifts, overhead cranes, He-backfilling equipment, etc. Attention is given to the design constraints involved, and to the Federal procurement process.
Addendum to the Final Audit Report on Procurement of Spare Parts and Supplies
1993-06-04
Contraves USA, Simulation and Systems Integration, Tampa, FL Contract No.: N00104-89-G-A050-4009 Awarded: April 20, 1990 Procurement Method...awarded sole source to Contraves . The amplifier is a source-controlled item, and Contraves is the only approved source. There are no commercial...The total contract value was $69,552. Contraves assembled and tested the amplifiers. For the subject procurement, Contraves paid $* per unit for the
Procurement Without Problems: Preparing the RFP.
ERIC Educational Resources Information Center
Epstein, Susan Baerg
1983-01-01
Discussion of factors contributing to successful procurement of automated library system focuses on preparation of Request for Proposal (RFP) and elements included in the RFP--administrative requirements, functional requirements, performance requirements, reliability requirements, testing procedures, standardized response language, location table,…
Qualification of an evaluated butterfly-packaged DFB laser designed for space applications
NASA Astrophysics Data System (ADS)
Tornow, S.; Stier, C.; Buettner, T.; Laurent, T.; Kneier, M.; Bru, J.; Lien, Y.
2017-11-01
An extended qualification program has proven the quality of a previously evaluated semiconductor laser diode, which is intended to be used in a subsystem for the GAIA mission. We report on results of several reliability tests performed in subgroups. The requirements of the procurement specification with respect to reliability and desired manufacturing processes were confirmed. This is an example for successful collaboration between component supplier, system integrator and payload responsible party.
Two Week Oral Dose Range-Finding Toxicity Study of WR242511 in Rats
1993-07-08
Express Clinical Chemistry System IFCC, Committee on Standards, Part 2. IFCC Method for Aspartate Aminotransferase, Amsterdam, Elsevier Scientific...PROCUREMENT INSTRUMENT IDENTIFICATION NUMBER DAM017-92-C-2OO1 8c ADDRESS (City, State, and ZIP Code) Fort Detrick Frederick, MO 21702-5009 10. SOURCE...7 2. INTRODUCTION 7 3. MATERIALS AND METHODS 7 3.1 Test Article 7 3.2 Animals 8 3.3 Experimental Design 8 3.4
NASA Technical Reports Server (NTRS)
1973-01-01
The requirements for processing, packaging, testing, and shipment of foods selected for use in the Apollo food system are presented. Specific foodstuffs chosen from the following categories are discussed: (1) soups; (2) juices; (3) breads; (4) meat and poultry products; (5) fruits and nuts; (6) desserts; and (7) beverages. Food procurement for the mobile quarantine facility and for Apollo preflight and postflight activities is also discussed.
2013-07-01
composed of vice admirals from the requirements, acquisition, and fleet communities, and has the mission of ensuring “the successful procurement...development, manning, training, sustainment, and operational employment” of the LCS, mission packages, and shore 4The LCS block buy contracts include fixed...capabilities, limitations, and safety issues to help reduce design and programmatic risks. Operational testing is intended to assess a weapon system’s
1982-02-01
two increments . Increment 1 provides the austere essential ofticer in Tactical Conatana (Uu) co,.manac center organic data display and communications...and a large screen display group. Equipment in Increment 2 has been chosen trom inventory or tnavy stauu- aros and provides a stand alone austere...installation or increment I on 19 designated flagships (14 carriers and five cruisers) and installation or Increment 2 on six carriers auG and the
Singh, Prabal Vikram; Tatambhotla, Anand; Kalvakuntla, Rohini; Chokshi, Maulik
2013-01-01
Objective To perform an initial qualitative comparison of the different procurement models in India to frame questions for future research in this area; to capture the finer differences between the state models through 53 process and price parameters to determine their functional efficiencies. Design Qualitative analysis is performed for the study. Five states: Tamil Nadu, Kerala, Odisha, Punjab and Maharashtra were chosen to ensure heterogeneity in a number of factors such as procurement type (centralised, decentralised or mixed); autonomy of the procurement organisation; state of public health infrastructure; geography and availability of data through Right to Information Act (RTI). Data on procurement processes were collected through key informant analysis by way of semistructured interviews with leadership teams of procuring organisations. These process data were validated through interviews with field staff (stakeholders of district hospitals, taluk hospitals, community health centres and primary health centres) in each state. A total of 30 actors were interviewed in all five states. The data collected are analysed against 52 process and price parameters to determine the functional efficiency of the model. Results The analysis indicated that autonomous procurement organisations were more efficient in relation to payments to suppliers, had relatively lower drug procurement prices and managed their inventory more scientifically. Conclusions The authors highlight critical success factors that significantly influence the outcome of any procurement model. In a way, this study raises more questions and seeks the need for further research in this arena to aid policy makers. PMID:23388196
Computerized engineering logic for procurement and dedication processes
DOE Office of Scientific and Technical Information (OSTI.GOV)
Tulay, M.P.
1996-12-31
This paper summarizes the work performed for designing the system and especially for calculating on-line expected performance and gives some significant results. In an attempt to better meet the needs of operations and maintenance organizations, many nuclear utility procurement engineering groups have simplified their procedures, developed on-line tools for performing the specification of replacement items, and developed relational databases containing part-level information necessary to automate the procurement process. Although these improvements have helped to reduce the engineering necessary to properly specify and accept/dedicate items for nuclear safety-related applications, a number of utilities have recognized that additional long-term savings can bemore » realized by integrating a computerized logic to assist technical procurement engineering personnel.« less
Challenges in developing e-government for good governance in North Sumatra
NASA Astrophysics Data System (ADS)
Siahaan, AY
2017-01-01
E-government as one form of public administration reform in Indonesia is increasingly related to the pursuance of good governance. This paper examines the relationship between of e-government and good governance by utilizing the case study design on the implementation of e-procurement in North Sumatra. It reveals centrality of local politics and business culture in understanding resistances of both local government officials and local business which creates loopholes’ for the practice of ‘bad governance’ in all phases of e-procurement in North Sumatra province. Data transparency does not equate and guarantee the realization of good governance. Public knowledge and understanding on government decision making processes and accountability (process and policy transparency) are central to achieve good governance through e-procurement. E-procurement system does not automatically change organizational and working culture of the implementers and suppliers. This paper provides insight to the attitude and the perception of private sector engage in e-procurement towards government in implementing e-government. Resistance, digital divide and local politics interrelatedly obstruct the realization of pursuing good governance through e-procurement.
V/STOL tilt rotor aircraft study. Volume 2: Preliminary design of research aircraft
NASA Technical Reports Server (NTRS)
1972-01-01
A preliminary design study was conducted to establish a minimum sized, low cost V/STOL tilt-rotor research aircraft with the capability of performing proof-of-concept flight research investigations applicable to a wide range of useful military and commercial configurations. The analysis and design approach was based on state-of-the-art methods and maximum use of off-the-shelf hardware and systems to reduce development risk, procurement cost and schedules impact. The rotors to be used are of 26 foot diameter and are the same as currently under construction and test as part of NASA Tilt-Rotor Contract NAS2-6505. The aircraft has a design gross weight of 12,000 lbs. The proposed engines to be used are Lycoming T53-L-13B rated at 1550 shaft horsepower which are fully qualified. A flight test investigation is recommended which will determine the capabilities and limitations of the research aircraft.
Reaping the benefits of an open systems approach: getting the commercial approach right
NASA Astrophysics Data System (ADS)
Pearson, Gavin; Dawe, Tony; Stubbs, Peter; Worthington, Olwen
2016-05-01
Critical to reaping the benefits of an Open System Approach within Defence, or any other sector, is the ability to design the appropriate commercial model (or framework). This paper reports on the development and testing of a commercial strategy decision support tool. The tool set comprises a number of elements, including a process model, and provides business intelligence insights into likely supplier behaviour. The tool has been developed by subject matter experts and has been tested with a number of UK Defence procurement teams. The paper will present the commercial model framework, the elements of the toolset and the results of testing.
77 FR 20281 - Designation of Product Categories for Federal Procurement
Federal Register 2010, 2011, 2012, 2013, 2014
2012-04-04
... Security and Rural Investment Act of 2002, as amended by the Food, Conservation, and Energy Act of 2008.... Information regarding the Federal biobased preferred procurement program (one part of the BioPreferred Program... of 2002 (FSRIA), as amended by the Food, Conservation, and Energy Act of 2008 (FCEA), 7 U.S.C. 8102...
Environmental testing of terrestrial flat plate photovoltaic modules
NASA Technical Reports Server (NTRS)
Hoffman, A.; Griffith, J.
1979-01-01
The Low-Cost Solar Array (LSA) Project at the Jet Propulsion Laboratory has as one objective: the development and implementation of environmental tests for flat plate photovoltaic modules as part of the Department of Energy's terrestrial photovoltaic program. Modules procured under this program have been subjected to a variety of laboratory tests intended to simulate service environments, and the results of these tests have been compared to available data from actual field service. This comparison indicates that certain tests (notably temperature cycling, humidity cycling, and cyclic pressure loading) are effective indicators of some forms of field failures. Other tests have yielded results useful in formulating module design guidelines. Not all effects noted in field service have been successfully reproduced in the laboratory, however, and work is continuing in order to improve the value of the test program as a tool for evaluating module design and workmanship. This paper contains a review of these ongoing efforts and an assessment of significant test results to date.
NASA Technical Reports Server (NTRS)
Keith, Theo G., Jr.; Jansen, Mark
2004-01-01
The main proposed research of this grant were: to design a high-temperature, conical magnetic bearing facility, to test the high-temperature, radial magnetic bearing facility to higher speeds, to investigate different backup bearing designs and materials, to retrofit the high-temperature test facility with a magnetic thrust bearing, to evaluate test bearings at various conditions, and test several lubricants using a spiral orbit tribometer. A high-temperature, conical magnetic bearing facility has been fully developed using Solidworks. The facility can reuse many of the parts of the current high-temperature, radial magnetic bearing, helping to reduce overall build costs. The facility has the ability to measure bearing force capacity in the X, Y, and Z directions through a novel bearing mounting design. The high temperature coils and laminations, a main component of the facility, are based upon the current radial design and can be fabricated at Texas A&M University. The coil design was highly successful in the radial magnetic bearing. Vendors were contacted about fabrication of the high temperature lamination stack. Stress analysis was done on the laminations. Some of the components were procured, but due to budget cuts, the facility build up was stopped.
Photovoltaic module reliability improvement through application testing and failure analysis
NASA Technical Reports Server (NTRS)
Dumas, L. N.; Shumka, A.
1982-01-01
During the first four years of the U.S. Department of Energy (DOE) National Photovoltatic Program, the Jet Propulsion Laboratory Low-Cost Solar Array (LSA) Project purchased about 400 kW of photovoltaic modules for test and experiments. In order to identify, report, and analyze test and operational problems with the Block Procurement modules, a problem/failure reporting and analysis system was implemented by the LSA Project with the main purpose of providing manufacturers with feedback from test and field experience needed for the improvement of product performance and reliability. A description of the more significant types of failures is presented, taking into account interconnects, cracked cells, dielectric breakdown, delamination, and corrosion. Current design practices and reliability evaluations are also discussed. The conducted evaluation indicates that current module designs incorporate damage-resistant and fault-tolerant features which address field failure mechanisms observed to date.
On development of an inexpensive, lightweight thermal micrometeroid garment for space suits
NASA Technical Reports Server (NTRS)
1975-01-01
A lightweight and inexpensive coverlayer developed for space suits is described. Material selection, procurement, and testing, pattern design, and prototype fabrication are discussed. By using the minimum required cross section necessary for earth orbital mission, by utilizing the lightest weight materials possible, and by decreasing the use of weight costly taping a lightweight and economical thermal micrometeroid garment was developed. Simplification of manufacturing techniques and use of off-the-shelf materials helped to reduce costs.
42 CFR 121.6 - Organ procurement.
Code of Federal Regulations, 2010 CFR
2010-10-01
... laboratory tests and clinical examinations of potential organ donors are performed to determine any... 42 Public Health 1 2010-10-01 2010-10-01 false Organ procurement. 121.6 Section 121.6 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES HEALTH RESOURCES DEVELOPMENT ORGAN...
Mechanism Design for Task Procurement with Flexible Quality of Service
NASA Astrophysics Data System (ADS)
Gerding, Enrico H.; Larson, Kate; Rogers, Alex; Jennings, Nicholas R.
In this paper, we consider the problem where an agent wishes to complete a single computational task, but lacks the required resources. Instead, it must contract self-interested service providers, who are able to flexibly manipulate the quality of service they deliver, in order to maximise their own utility. We extend an existing model to allow for multiple such service providers to be contracted for the same task, and derive optimal task procurement mechanisms in the setting where the agent has full knowledge of the cost functions of these service providers (considering both simultaneous and sequential procurement). We then extend these results to the incomplete information setting where the agent must elicit cost information from the service providers, and we characterise a family of incentive-compatible and individually-rational mechanisms. We show empirically that sequential procurement always generates greater utility for the agent compared to simultaneous procurement, and that over a range of settings, contracting multiple providers is preferable to contracting just one.
Impact of Ischemia and Procurement Conditions on Gene Expression in Renal Cell Carcinoma
Liu, Nick W.; Sanford, Thomas; Srinivasan, Ramaprasad; Liu, Jack L.; Khurana, Kiranpreet; Aprelikova, Olga; Valero, Vladimir; Bechert, Charles; Worrell, Robert; Pinto, Peter A.; Yang, Youfeng; Merino, Maria; Linehan, W. Marston; Bratslavsky, Gennady
2013-01-01
Purpose Previous studies have shown that ischemia alters gene expression in normal and malignant tissues. There are no studies that evaluated effects of ischemia in renal tumors. This study examines the impact of ischemia and tissue procurement conditions on RNA integrity and gene expression in renal cell carcinoma. Experimental Design Ten renal tumors were resected without renal hilar clamping from 10 patients with renal clear cell carcinoma. Immediately after tumor resection, a piece of tumor was snap frozen. Remaining tumor samples were stored at 4C, 22C and 37C and frozen at 5, 30, 60, 120, and 240 minutes. Histopathologic evaluation was performed on all tissue samples, and only those with greater than 80% tumor were selected for further analysis. RNA integrity was confirmed by electropherograms and quantitated using RIN index. Altered gene expression was assessed by paired, two-sample t-test between the zero time point and aliquots from various conditions obtained from the same tumor. Results One hundred and forty microarrays were performed. Some RNA degradation was observed 240 mins after resection at 37C. The expression of over 4,000 genes was significantly altered by ischemia times or storage conditions. The greatest gene expression changes were observed with longer ischemia time and warmer tissue procurement conditions. Conclusion RNA from kidney cancer remains intact for up to 4 hours post surgical resection regardless of storage conditions. Despite excellent RNA preservation, time after resection and procurement conditions significantly influence gene expression profiles. Meticulous attention to pre-acquisition variables is of paramount importance for accurate tumor profiling. PMID:23136194
Managing EEE part standardisation and procurement
NASA Astrophysics Data System (ADS)
Serieys, C.; Bensoussan, A.; Petitmangin, A.; Rigaud, M.; Barbaresco, P.; Lyan, C.
2002-12-01
This paper presents the development activities in space components selection and procurement dealing with a new data base tool implemented at Alcatel Space using TransForm softwaa re configurator developed by Techform S.A. Based on TransForm, Access Ingenierie has devv eloped a software product named OLG@DOS which facilitate the part nomenclatures analyses for new equipment design and manufacturing in term of ACCESS data base implementation. Hi-Rel EEE part type technical, production and quality information are collected and compiled usingproduction data base issued from production tools implemented for equipment definition, description and production based on Manufacturing Resource Planning (MRP II Control Open) and Parametric Design Manager (PDM Work Manager). The analysis of any new equipment nomenclature may be conducted through this means for standardisation purpose, cost containment program and management procurement activities as well as preparation of Component reviews as Part Approval Document and Declared Part List validation.
ERIC Educational Resources Information Center
Falk, Leslie K.
This handbook is designed primarily as a general orientation aid, not an operation manual. It presents the background (mainly regulatory) of Federal procurement work, details, devices and tactics found to be successful, and calls attention to special sources of supply. Although planned as an aid for librarians who are engaged in Federal…
DOE Office of Scientific and Technical Information (OSTI.GOV)
Weber, E.R.
1983-09-01
The appendixes for the Saguaro Power Plant includes the following: receiver configuration selection report; cooperating modes and transitions; failure modes analysis; control system analysis; computer codes and simulation models; procurement package scope descriptions; responsibility matrix; solar system flow diagram component purpose list; thermal storage component and system test plans; solar steam generator tube-to-tubesheet weld analysis; pipeline listing; management control schedule; and system list and definitions.
1978-06-01
Oxygen Demand , Phosphorus , Army activities, or BAAPs (Basic Activities to Imple- and Mercury ; and in Sociology : Population Composi- ment Army Programs...wide) involved? minerals with a proved world reserve (in 1975) of 10 to 15 years are mercury and silver; from 15 to 20years , • What are the energy...antidotes and detox - 128 Forecast. Development of predictions or models ifiers). Design fnethods for interfering with delivery of of present and
Advanced thermionic energy conversion
NASA Technical Reports Server (NTRS)
Britt, E. J.; Fitzpatrick, G. D.; Hansen, L. K.; Rasor, N. S.
1974-01-01
Basic analytical and experimental exploration was conducted on several types of advanced thermionic energy converters, and preliminary analysis was performed on systems utilizing advanced converter performance. The Pt--Nb cylindrical diode which exhibited a suppressed arc drop, as described in the preceding report, was reassembled and the existence of the postulated hydrid mode of operation was tentatively confirmed. Initial data obtained on ignited and unignited triode operation in the demountable cesium vapor system essentially confirmed the design principles developed in earlier work, with a few exceptions. Three specific advanced converter concepts were selected as candidates for concentrated basic study and for practical evaluation in fixed-configuration converters. Test vehicles and test stands for these converters and a unique controlled-atmosphere station for converter assembly and processing were designed, and procurement was initiated.
Development of Enhanced Avionics Flight Hardware Selection Process
NASA Technical Reports Server (NTRS)
Smith, K.; Watson, G. L.
2003-01-01
The primary objective of this research was to determine the processes and feasibility of using commercial off-the-shelf PC104 hardware for flight applications. This would lead to a faster, better, and cheaper approach to low-budget programs as opposed to the design, procurement. and fabrication of space flight hardware. This effort will provide experimental evaluation with results of flight environmental testing. Also, a method and/or suggestion used to bring test hardware up to flight standards will be given. Several microgravity programs, such as the Equiaxed Dendritic Solidification Experiment, Self-Diffusion in Liquid Elements, and various other programs, are interested in PC104 environmental testing to establish the limits of this technology.
Military applications of emission and susceptibility data
NASA Astrophysics Data System (ADS)
Kohlbacher, Howard; Walker, William
A basic design consideration for new military communications-electronics (C-E) equipment is that it be electromagnetically compatible with the environment in which it will operate. A military standard (MIL-STD-461B) describes the design requirements for the control of the unintentional electromagnetic emission and susceptibility characteristics of electronic equipment and subsystems designed or procured by the US Department of Defense. For new systems which fail the test standards of MIL-STD-461B with regard to radiated susceptibility (RSO3) or radiated emissions (RE02), a decision must be made to fix the new system or to field it without a fix. A procedure to aid in the decision process is outlined. The minimum separation distances required between a failed test system and other C-E equipment in its environment to avoid interference are determined. If this distance is operationally acceptable, the failed unit may be considered to be operationally compatible with its electromagnetic environment.
NASA Astrophysics Data System (ADS)
1981-12-01
Test data were collected on 1035 plastic encapsulated devices and 75 hermetically scaled control group devices that were purchased from each of five different manufacturers in the categories of (1) low power Schottsky TTL (bipolar) digital circuits; (2) CMOS digital circuits; (3) operational amplifier linear circuits; and (4) NPN transistors. These parts were subjected to three different initial screening conditions, then to extended life testing, to determine any possible advantages or trends for any particular screen. Several tests were carried out in the areas of flammability testing, humidity testing, high pressure steam (auroclave) testing, and high temperature storage testing. Test results are presented. Procurement and application considerations for use of plastic encapsulated semiconductors are presented and a statistical analysis program written to study the log normal distributions resulting from life testing is concluded.
NASA Technical Reports Server (NTRS)
1981-01-01
Test data were collected on 1035 plastic encapsulated devices and 75 hermetically scaled control group devices that were purchased from each of five different manufacturers in the categories of (1) low power Schottsky TTL (bipolar) digital circuits; (2) CMOS digital circuits; (3) operational amplifier linear circuits; and (4) NPN transistors. These parts were subjected to three different initial screening conditions, then to extended life testing, to determine any possible advantages or trends for any particular screen. Several tests were carried out in the areas of flammability testing, humidity testing, high pressure steam (auroclave) testing, and high temperature storage testing. Test results are presented. Procurement and application considerations for use of plastic encapsulated semiconductors are presented and a statistical analysis program written to study the log normal distributions resulting from life testing is concluded.
Medical device procurement in low- and middle-income settings: protocol for a systematic review
2014-01-01
Background Medical device procurement processes for low- and middle-income countries (LMICs) are a poorly understood and researched topic. To support LMIC policy formulation in this area, international public health organizations and research institutions issue a large body of predominantly grey literature including guidelines, manuals and recommendations. We propose to undertake a systematic review to identify and explore the medical device procurement methodologies suggested within this and further literature. Procurement facilitators and barriers will be identified, and methodologies for medical device prioritization under resource constraints will be discussed. Methods/design Searches of both bibliographic and grey literature will be conducted to identify documents relating to the procurement of medical devices in LMICs. Data will be extracted according to protocol on a number of pre-specified issues and variables. First, data relating to the specific settings described within the literature will be noted. Second, information relating to medical device procurement methodologies will be extracted, including prioritization of procurement under resource constraints, the use of evidence (e.g. cost-effectiveness evaluations, burden of disease data) as well as stakeholders participating in procurement processes. Information relating to prioritization methodologies will be extracted in the form of quotes or keywords, and analysis will include qualitative meta-summary. Narrative synthesis will be employed to analyse data otherwise extracted. The PRISMA guidelines for reporting will be followed. Discussion The current review will identify recommended medical device procurement methodologies for LMICs. Prioritization methods for medical device acquisition will be explored. Relevant stakeholders, facilitators and barriers will be discussed. The review is aimed at both LMIC decision makers and the international research community and hopes to offer a first holistic conceptualization of this topic. PMID:25336161
Tang, Yunhua; Han, Ming; Chen, Maogen; Wang, Xiaoping; Ji, Fei; Zhao, Qiang; Zhang, Zhiheng; Ju, Weiqiang; Wang, Dongping; Guo, Zhiyong; He, Xiaoshun
2017-11-01
Transplantation centers have given much attention to donor availability. However, no reliable quantitative methods have been employed to accurately assess graft quality before transplantation. Here, we report that the indocyanine green (ICG) clearance test is a valuable index for liver grafts. We performed the ICG clearance test on 90 brain-dead donors within 6 h before organ procurement between March 2015 and November 2016. We also analyzed the relationship between graft liver function and early graft survival after liver transplantation (LT). Our results suggest that the ICG retention rate at 15 min (ICGR15) of donors before procurement was independently associated with 3-month graft survival after LT. The best donor ICGR15 cutoff value was 11.0%/min, and we observed a significant increase in 3-month graft failure among patients with a donor ICGR15 above this value. On the other hand, a donor ICGR15 value of ≤ 11.0%/min could be used as an early assessment index of graft quality because it provides additional information to the transplant surgeon or organ procurement organization members who must maintain or improve organ function to adapt the LT. An ICG clearance test before liver procurement might be an effective quantitative method to predict graft availability and improve early graft prognosis after LT.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Jenkins, R.G.; Siergiej, J.M.
1962-12-28
In a program to develop a complete manufacturing process for ihe production of beryllium channels, techniques are being sought for drawing to obtain a flnal product meeting specifications more rigorous than are obtainable by direct extrusion. Progress in designing and procuring the special tooling required to draw complex shapes at elevated temperature is described, and the flrst set of draw dies is evaluated with respect to design and quality. Three experimental draw attempts have been made on U-channels, in addition to draw tests on flats. (auth)
Rationale for windshield glass system specification requirements for shuttle orbiter
NASA Technical Reports Server (NTRS)
Hayashida, K.; King, G. L.; Tesinsiky, J.; Wittenburg, D. R.
1972-01-01
A preliminary procurement specification for the space shuttle orbiter windshield pane, and some of the design considerations and rationale leading to its development are presented. The windshield designer is given the necessary methods and procedures for assuring glass pane structural integrity by proof test. These methods and procedures are fully developed for annealed and thermally tempered aluminosilicate, borosilicate, and soda lime glass and for annealed fused silica. Application of the method to chemically tempered glass is considered. Other considerations are vision requirements, protection against bird impact, hail, frost, rain, and meteoroids. The functional requirements of the windshield system during landing, ferrying, boost, space flight, and entry are included.
Nickel-hydrogen cell low-Earth life test update
NASA Technical Reports Server (NTRS)
Frate, David T.
1991-01-01
When individual pressure vessel (IPV) nickel-hydrogen (Ni/H2) cells were selected as the energy storage system for the Space Station Freedom in March of 1986, a limited database existed on life and performance characteristics of these cells in a low earth orbit (LEO) regime. Therefore, NASA LeRC initiated a Ni/H2 cell test program with the primary objectives of building a test facility, procuring cells from existing NASA contracts, and screening several cell designs by life testing in a LEO 35 percent depth of discharge (DOD) scenario. A total of 40 cells incorporating 13 designs were purchased from Yardney, Hughes, and Eagle-Picher. Thirty-two of the cells purchased were 65 A-hr nameplate capacity and eight cells were 50 A-hr. Yardney and Eagle-Picher cells were built with both the Air Force recirculating and the advanced back-to-back electrode stack configurations and incorporated 31 and 26 percent KOH. Acceptance testing of the first delivered cells began in March of 1988, with life testing following in September of that year.Performance comparisons of these cells are made here while specifically addressing life test data relative to the design differences.
Nickel-hydrogen cell low-earth-orbit life test update
NASA Technical Reports Server (NTRS)
Frate, David T.
1991-01-01
When individual pressure vessel (IPV) nickel-hydrogen (Ni/H2) cells were selected as the energy storage system for Space Station Freedom in March of 1986, a limited database existed on life and performance characteristics of these cells in a low earth orbit (LEO) regime. Therefore, NASA LeRC initiated a Ni/H2 cell test program with the primary objectives of building a test facility, procuring cells from existing NASA contracts, and screening several cell designs by life testing in a LEO 35 percent depth of discharge (DOD) scenario. A total of 40 cells incorporating 13 designs were purchased from Yardney, Hughes, and Eagle-Picher. Thirty-two of the cells purchased were 65 A-hr nameplate capacity and eight cells were 50 A-Hr. Yardney and Eagle-Picher cells were built with both the Air Force recirculating and the advanced back-to-back electrode stack configurations and incorporated 31 and 26 percent KOH. Acceptance testing of the first delivered cells began in March of 1988, with life testing following in September of that year. Performance comparisons of these cells are made here while specifically addressing life test data relative to the design differences.
Green related practices for construction procurement
NASA Astrophysics Data System (ADS)
Bidin, Z. A.; Bohari, A. A. M.; Rais, S. L. A.; Saferi, M. M.
2018-04-01
Environment degradation issue has been a worldwide problem and various efforts have been done to minimise the problem. Construction sectors are pointed as one of the major contributors to its construction activities. Green-oriented procurement [GP] is considered as an environmental strategy to integrate the environmental practices into the construction delivery. Thus, this paper reviews the concept of GP and the practices related to it. The outcome of this research findings provides a basis for understanding the concept of GP and the further development of GP. The listed GP practices identified from this paper can serve as guidelines for industry practitioners to design, implement, and benchmarking the green practices in their procurement delivery.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Brown, W.H.; Gopalakrishnan, S.; Fehlau, R.
1982-03-01
As a result of prior EPRI-sponsored studies, it was concluded that a research program should be designed and implemented to provide an improved basis for the design, procurement, testing, and operation of large feed pumps with increased reliability and stability over the full range of operating conditions. This two-volume report contains a research plan which is based on a review of the present state of the art and which defines the necessary R and D program and estimates the benefits and costs of the program. The recommended research program consists of 30 interrelated tasks. It is designed to perform themore » needed research; to verify the results; to develop improved components; and to publish computer-aided design methods, pump specification guidelines, and a troubleshooting manual. Most of the technology proposed in the research plan is applicable to nuclear power plants as well as to fossil-fired plants. This volume contains appendixes on pump design, cavitation damage, performance testing, hydraulics, two-phase flow in pumps, flow stability, and rotor dynamics.« less
Design and Verification of Critical Pressurised Windows for Manned Spaceflight
NASA Astrophysics Data System (ADS)
Lamoure, Richard; Busto, Lara; Novo, Francisco; Sinnema, Gerben; Leal, Mendes M.
2014-06-01
The Window Design for Manned Spaceflight (WDMS) project was tasked with establishing the state-of-art and explore possible improvements to the current structural integrity verification and fracture control methodologies for manned spacecraft windows.A critical review of the state-of-art in spacecraft window design, materials and verification practice was conducted. Shortcomings of the methodology in terms of analysis, inspection and testing were identified. Schemes for improving verification practices and reducing conservatism whilst maintaining the required safety levels were then proposed.An experimental materials characterisation programme was defined and carried out with the support of the 'Glass and Façade Technology Research Group', at the University of Cambridge. Results of the sample testing campaign were analysed, post-processed and subsequently applied to the design of a breadboard window demonstrator.Two Fused Silica glass window panes were procured and subjected to dedicated analyses, inspection and testing comprising both qualification and acceptance programmes specifically tailored to the objectives of the activity.Finally, main outcomes have been compiled into a Structural Verification Guide for Pressurised Windows in manned spacecraft, incorporating best practices and lessons learned throughout this project.
Qualification test results for DOE solar photovoltaic flat panel procurement - PRDA 38
NASA Technical Reports Server (NTRS)
Griffith, J. S.
1980-01-01
Twelve types of prototypes modules for the DOE Photovoltaic Flat Panel Procurement (PRDA 38) were subjected to qualification tests at the Jet Propulsion Laboratory according to a new specification. Environmental exposures were carried out separately and included temperature cycling, humidity, wind simulation, and hail. The most serious problems discovered were reduced insulation resistance to ground and ground continuity of the metal frames, electrical degradation, erratic power readings, and delamination. The electrical and physical characteristics of the newly received modules are also given.
The VRT gas turbine combustor - Phase II
NASA Technical Reports Server (NTRS)
Melconian, Jerry O.; Mongia, Hukam C.; Nguyen, Hung L.
1992-01-01
An innovative annular combustor configuration is being developed for aircraft and other gas turbine engines. This design has the potential of permitting higher turbine inlet temperatures by reducing the pattern factor and providing a major reduction in NO(x) emission. The design concept is based on a Variable Residence Time (VRT) technique which allows large fuel particles adequate time to completely burn in the circumferentially mixed primary zone. High durability of the combustor is achieved by dual-function use of the incoming air. In Phase I, the feasibility of the concept was demonstrated by water analogue tests and 3D computer modeling. The flow pattern within the combustor was as predicted. The VRT combustor uses only half the number of fuel nozzles of the conventional configuration. In Phase II, hardware was designed, procured, and tested under conditions simulating typical supersonic civil aircraft cruise conditions to the limits of the rig. The test results confirmed many of the superior performance predictions of the VRT concept. The Hastelloy X liner showed no signs of distress after nearly six hours of tests using JP5 fuel.
DOE Office of Scientific and Technical Information (OSTI.GOV)
DAVIS, S.J.
2000-12-28
This document identifies critical characteristics of components to be dedicated for use in Safety Significant (SS) Systems, Structures, or Components (SSCs). This document identifies the requirements for the components of the common, radiation area, monitor alarm in the WESF pool cell. These are procured as Commercial Grade Items (CGI), with the qualification testing and formal dedication to be performed at the Waste Encapsulation Storage Facility (WESF) for use in safety significant systems. System modifications are to be performed in accordance with the approved design. Components for this change are commercially available and interchangeable with the existing alarm configuration This documentmore » focuses on the operational requirements for alarm, declaration of the safety classification, identification of critical characteristics, and interpretation of requirements for procurement. Critical characteristics are identified herein and must be verified, followed by formal dedication, prior to the components being used in safety related applications.« less
Design of horizontal test cryostat for testing two 650 MHz cavities: cryogenic considerations
NASA Astrophysics Data System (ADS)
Khare, P.; Gilankar, S.; Kush, P. K.; Lakshminarayanan, A.; Choubey, R.; Ghosh, R.; Jain, A.; Patel, H.; Gupta, P. D.; Hocker, A.; Ozelis, J. P.; Geynisman, M.; Reid, C.; Poloubotko, V.; Mitchell, D.; Peterson, T. J.; Nicol, T. H.
2017-02-01
Horizontal Test Cryostat has been designed for testing two 650 MHz "dressed" Superconducting Radio Frequency (SCRF) cavities in a single testing cycle at Raja Ramanna Centre for Advanced Technology, India (RRCAT) in collaboration with Fermi National Accelerator Laboratory, USA (FNAL). This cryostat will facilitate testing of two 5-cell 650 MHz SCRF cavities, in CW or pulsed regime, for upcoming High Intensity Superconducting Proton Accelerator projects at both countries. Two such HTS facilities are planned, one at RRCAT for Indian Spallation Neutron Source project (ISNS), which is on the horizon, and the other at FNAL, USA. A test cryostat, a part of horizontal test stand-2 (HTS-2) will be set up at RRCAT for Indian project. In order to maximize the utility of this facility, it can also be used to test two dressed 9-cell 1.3 GHz cavities and other similarly-sized devices. The facility assumes, as an input, the availability of liquid nitrogen at 80 K and liquid helium at 4.5 K and 2 K, with a refrigeration capacity of approximately 50 W at 2 K. Design work of cryostat has been completed and now procurement process is in progress. This paper discusses salient features of the cryostat. It also describes different design calculations and ANSYS analysis for cool down of few subsystems like cavity support system and liquid nitrogen cooled thermal radiation shield of horizontal test cryostat..
One-on-one care management and procurement of Naloxone for ambulatory use.
Whittington, Richard; Whittington, Kathleen; Whittington, John; Porter, Joel; Zimmermann, Karla; Case, Holly; Berg, Stacey
2018-02-16
Morbidity and mortality from prescription opioids has reached unprecedented levels. Opioids remain part of chronic pain treatment in primary care. This study was designed to determine whether one-on-one care management increases procurement of Naloxone, an opioid antagonist shown to reduce morbidity and mortality in opioid overdoses. Participants included all patients ≥18 years enrolled in a primary care-based chronic pain management program and who were prescribed a daily dose of opioids for treatment of chronic pain. In total, 153 patients chose to participate. Each had a 1 h one-on-one education meeting with a registered nurse. Among the enrolled, eight patients (5.2%) had procured Naloxone prior to intervention. Overall, 31 additional patients (20.2%) procured Naloxone after intervention, a 288% relative improvement in the attainment of Naloxone (P < 0.0001) (χ2 = 29.032 with 1 degree freedom). Of the 114 participants who never procured Naloxone, 69.3% believed it was unnecessary, 20% forgot about Naloxone, 8% said it was cost prohibitive, 3.5% had access concerns and 0.9% had concerns about side effects. Direct one-on-one nurse care management sessions were associated with an increased procurement of Naloxone in a primary care-based pain management program. A significant number of patients believed Naloxone was unnecessary after the intervention.
Antenna Scan Mechanism for an Inter Satellite Link of a Constellation Program
NASA Astrophysics Data System (ADS)
Köker, Ingo; Härtel, Frank
2015-09-01
For a constellation program, RF Inter Satellite Links between single satellites can support ranging and communication for uploading mission data or telecommands. These data shall be uploaded from one single ground station to the next reachable satellite and transmitted by the Inter Satellite Link to further dedicated satellites. For this function each satellite has to be equipped with 2 Antenna Scan Mechanisms (ASM) for data transfer in the K-Band.The main challenges for the mechanisms are the high speed position change requirement, low mass requirement and the design to cost approach. Furthermore a small envelope to accommodate the 2- axes antenna scan mechanism was provided. The maximum position change of +/- 180° needs to be reached within 3 seconds. All requirements shall be achieved by relying on the heritage design of our downlink antenna pointing mechanism product.The ASM design approach was based on our 2-axes steerable downlink antenna; however during the definition phase it turned out that some major changes have to be implemented due to mission requirements (high operation speed and long lifetime). Following the design to cost approach most components could be procured from industrial standard but had to be qualified in terms of functionality, performance and life. The following industrial components have been selected: - Bearings procured from an industrial supplier and modified (cage) by a supporting supplier - The selected actuator is a standard stepper motor equipped with redundant windings - The slip ring design was used from a previous project in order to keep the heritage - Suitable rotary joints for the RF link were provided by a small and flexible company However at the very beginning of the project some difficulties with the bearings selection and procurementhave been identified. Since the most suitable standard catalog bearings were not available in time, we were forced to use alternatives. In parallel due to envelope constrains the re-location of one actuator followed by additional design modifications became necessary. Finally this design modification impacts the bearing loads and consequently the selection of other bearings became necessary.The paper will show the error propagation generated by lead time issue of a main component and the test results of the final design including friction tests, and first measurements during the life test program.
Military handbook: Metallic materials and elements for aerospace vehicle structures, volume 1
NASA Astrophysics Data System (ADS)
1994-11-01
Since many aerospace companies manufacture both commercial and military products, the standardization of metallic materials design data, which are acceptable to government procuring or certification agencies, is very beneficial to those manufacturers as well as governmental agencies. Although the design requirements for military and commercial products may differ greatly, the required design values for the strength of materials and elements and other needed material characteristics are often identical. Therefore this publication is to provide standardized design values and related design information for metallic materials and structural elements used in aerospace structures. The data contained herein or from approved items in the minutes of MIL-RDBK-5 coordination meetings are acceptable to the Air Force, the Navy, the Army, and the Federal Aviation Administration. Approval by the procuring or certificating agency must be obtained for the use of design values for products not contained herein.
NASA Technical Reports Server (NTRS)
Salikuddin, M.; Kraft, R. E.; Syed, A. a.; Vu, D. D.; Mungur, P.; Langenbrunner, L. E.; Majjigi, R. K.
2006-01-01
The objectives of the initial effort (Phase I) of HSR Liner Technology Program, the selection of promising liner concepts, design and fabrication of these concepts for laboratory tests, testing these liners in the laboratory by using impedance tube and flow ducts, and developing empirical impedance/suppression correlation, are successfully completed. Acoustic and aerodynamic criteria for the liner design are established. Based on these criteria several liners are designed. The liner concepts designed and fabricated include Single-Degree-of-Freedom (SDOF), Two-Degree-of-Freedom (2DOF), and Bulk Absorber. Two types of SDOF treatment are fabricated, one with a perforated type face plate and the other with a wiremesh (woven) type faceplate. In addition, special configurations of these concepts are also included in the design. Several treatment panels are designed for parametric study. In these panels the facesheets of different porosity, hole diameter, and sheet thickness are utilized. Several deep panels (i.e., 1 in. deep) are designed and instrumented to measure DC flow resistance and insitu impedance in the presence of grazing flow. Basic components of these panels (i.e., facesheets, bulk materials, etc.) are also procured and tested. The results include DC flow resistance, normal impedance, and insertion loss.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Stofleth, Jerome H.; Tribble, Megan Kimberly; Crocker, Robert W.
2017-05-01
The V27 containment vessel was procured by the US Army Recovered Chemical Material Directorate ( RCMD ) as a replacement vessel for use on the P2 Explosive Destruction Systems. It is the third EDS vessel to be fabricated under Code Case 2564 of the ASME Boiler and Pressure Vessel Code, which provides rules for the design of impulsively loaded vessels. The explosive rating for the vessel, based on the Code Case, is nine (9) pounds TNT - equivalent for up to 637 detonations . This report documents the results of explosive tests that were done on the vessel at Sandiamore » National Laboratories in Albuquerque New Mexico to qualify the vessel for explosive use . The primary qualification test consisted of si x 1.5 pound charges of Composition C - 4 (equivalent to 11.25 pounds TNT) distributed around the vessel in accordance with the User Design Specification. Four subsequent tests using less explosive evaluated the effects of slight variations in orientation of the charges . All vessel acceptance criteria were met.« less
Two-Step Formal Advertisement: An Examination.
1976-10-01
The purpose of this report is to examine the potential application of the Two-Step Formal Advertisement method of procurement. Emphasis is placed on...Step formal advertising is a method of procurement designed to take advantage of negotiation flexibility and at the same time obtain the benefits of...formal advertising . It is used where the specifications are not sufficiently definite or may be too restrictive to permit full and free competition
NASA/MSFC Large Stretch Press Study
NASA Technical Reports Server (NTRS)
Choate, M. W.; Nealson, W. P.; Jay, G. C.; Buss, W. D.
1985-01-01
The purpose of this study was to: A. assess and document the advantages/disadvantages of a government agency investment in a large stretch form press on the order of 5000 tons capacity (per jaw); B. develop a procurement specification for the press; and C. provide trade study data that will permit an optimum site location. Tasks were separated into four major elements: cost study, user survey, site selection, and press design/procurement specification.
Farmers’ Perceptions of Local Food Procurement, Mississippi, 2013
Rosenberg, Nathan; Truong, Nhan L.; Russell, Tyler; Abdul-Haqq, Deja; Gipson, June A.
2014-01-01
We sought to understand the experiences and perceptions of food producers regarding food procurement programs for local institutions. A total of 72 (45%) Mississippi fruit and vegetable growers completed a mailed survey, and of those that reported selling to local businesses and institutions (54%), few were selling to schools (13%). The primary motivations to sell to institutions were to increase profits (67%) and to improve nutrition within their communities (57%), while the most commonly reported barrier was a lack of knowledge about how to sell to institutions (39%). Farm to institution programs must develop evidence-based practices designed to address barriers to producers’ participation in local institutional food procurement programs. PMID:24967828
Functional Performance of Pyrovalves
NASA Technical Reports Server (NTRS)
Bement, Laurence J.
1996-01-01
Following several flight and ground test failures of spacecraft systems using single-shot, 'normally closed' pyrotechnically actuated valves (pyrovalves), a government/industry cooperative program was initiated to assess the functional performance of five qualified designs. The goal of the program was to improve performance-based requirements for the procurement of pyrovalves. Specific objectives included the demonstration of performance test methods, the measurement of 'blowby' (the passage of gases from the pyrotechnic energy source around the activating piston into the valve's fluid path), and the quantification of functional margins for each design. Experiments were conducted in-house at NASA on several units each of the five valve designs. The test methods used for this program measured the forces and energies required to actuate the valves, as well as the energies and the pressures (where possible) delivered by the pyrotechnic sources. Functional performance ranged widely among the designs. Blowby cannot be prevented by o-ring seals; metal-to-metal seals were effective. Functional margin was determined by dividing the energy delivered by the pyrotechnic sources in excess to that required to accomplish the function by the energy required for that function. All but two designs had adequate functional margins with the pyrotechnic cartridges evaluated.
Rethinking health sector procurement as developmental linkages in East Africa.
Mackintosh, Maureen; Tibandebage, Paula; Karimi Njeru, Mercy; Kariuki Kungu, Joan; Israel, Caroline; Mujinja, Phares G M
2018-03-01
Health care forms a large economic sector in all countries, and procurement of medicines and other essential commodities necessarily creates economic linkages between a country's health sector and local and international industrial development. These procurement processes may be positive or negative in their effects on populations' access to appropriate treatment and on local industrial development, yet procurement in low and middle income countries (LMICs) remains under-studied: generally analysed, when addressed at all, as a public sector technical and organisational challenge rather than a social and economic element of health system governance shaping its links to the wider economy. This article uses fieldwork in Tanzania and Kenya in 2012-15 to analyse procurement of essential medicines and supplies as a governance process for the health system and its industrial links, drawing on aspects of global value chain theory. We describe procurement work processes as experienced by front line staff in public, faith-based and private sectors, linking these experiences to wholesale funding sources and purchasing practices, and examining their implications for medicines access and for local industrial development within these East African countries. We show that in a context of poor access to reliable medicines, extensive reliance on private medicines purchase, and increasing globalisation of procurement systems, domestic linkages between health and industrial sectors have been weakened, especially in Tanzania. We argue in consequence for a more developmental perspective on health sector procurement design, including closer policy attention to strengthening vertical and horizontal relational working within local health-industry value chains, in the interests of both wider access to treatment and improved industrial development in Africa. Copyright © 2018 The Authors. Published by Elsevier Ltd.. All rights reserved.
32 CFR 634.4 - Responsibilities.
Code of Federal Regulations, 2011 CFR
2011-07-01
... installations by participating in traffic control studies designed to obtain information on traffic problems and... phase of engineering concerned with the planning, design, construction, and maintenance of streets, highways, and abutting lands. (2) Select, determine appropriate design, procure, construct, install, and...
32 CFR 634.4 - Responsibilities.
Code of Federal Regulations, 2014 CFR
2014-07-01
... installations by participating in traffic control studies designed to obtain information on traffic problems and... phase of engineering concerned with the planning, design, construction, and maintenance of streets, highways, and abutting lands. (2) Select, determine appropriate design, procure, construct, install, and...
32 CFR 634.4 - Responsibilities.
Code of Federal Regulations, 2010 CFR
2010-07-01
... installations by participating in traffic control studies designed to obtain information on traffic problems and... phase of engineering concerned with the planning, design, construction, and maintenance of streets, highways, and abutting lands. (2) Select, determine appropriate design, procure, construct, install, and...
32 CFR 634.4 - Responsibilities.
Code of Federal Regulations, 2013 CFR
2013-07-01
... installations by participating in traffic control studies designed to obtain information on traffic problems and... phase of engineering concerned with the planning, design, construction, and maintenance of streets, highways, and abutting lands. (2) Select, determine appropriate design, procure, construct, install, and...
32 CFR 634.4 - Responsibilities.
Code of Federal Regulations, 2012 CFR
2012-07-01
... installations by participating in traffic control studies designed to obtain information on traffic problems and... phase of engineering concerned with the planning, design, construction, and maintenance of streets, highways, and abutting lands. (2) Select, determine appropriate design, procure, construct, install, and...
7 CFR 2902.5 - Item designation.
Code of Federal Regulations, 2010 CFR
2010-01-01
... additionally will not designate items for preferred procurement that are determined to have mature markets. USDA will determine mature market status by whether the item had significant national market penetration in 1972. ...
Energy Systems Integration Facility (ESIF): Golden, CO - Energy Integration
DOE Office of Scientific and Technical Information (OSTI.GOV)
Sheppy, Michael; VanGeet, Otto; Pless, Shanti
2015-03-01
At NREL's Energy Systems Integration Facility (ESIF) in Golden, Colo., scientists and engineers work to overcome challenges related to how the nation generates, delivers and uses energy by modernizing the interplay between energy sources, infrastructure, and data. Test facilities include a megawatt-scale ac electric grid, photovoltaic simulators and a load bank. Additionally, a high performance computing data center (HPCDC) is dedicated to advancing renewable energy and energy efficient technologies. A key design strategy is to use waste heat from the HPCDC to heat parts of the building. The ESIF boasts an annual EUI of 168.3 kBtu/ft2. This article describes themore » building's procurement, design and first year of performance.« less
1985-11-01
11.251 16 1 mAoop RESOLUT" TEST CHT t4A1109L 64JREAU OF STANDARS -163- 01FILE GOO! AD-AI181 235 AFVAL-TR-86-4006 Volume IV Par t 2 INTEGRATED...River Road Schenectady. New York 12345 Final Report for Period 22 September 1980 3 1 July 1985 November 1985 Approved for public release; distribution is... procurement operation, the United States Government thereby incurs no responsibility nor any obligation whatsoever, and the fact that the government may
Lane, Joseph P
2015-01-01
Society typically relies on the industrial sector to supply product and service innovations through the free market system. In some areas of free market failure deemed important to society - such as Assistive Technology - governments intervene by applying alternative innovation systems. This paper contends that governments consistently and inappropriately support an exploratory grant approach led by academia which generates knowledge in conceptual and prototype states, and instead should shift to a procurement contract approach led by industry which designs, tests and deploys commercial products and services.
The Hydrologic Instrumentation Facility of the U.S. Geological Survey
Wagner, C.R.; Jeffers, Sharon
1984-01-01
The U.S. Geological Survey Water Resources Division has improved support to the agencies field offices by the consolidation of all instrumentation support services in a single facility. This facility known as the Hydrologic Instrumentation Facility (HIF) is located at the National Space Technology Laboratory, Mississippi, about 50 miles east of New Orleans, Louisiana. The HIF is responsible for design and development, testing, evaluation, procurement, warehousing, distribution and repair of a variety of specialized hydrologic instrumentation. The centralization has resulted in more efficient and effective support of the Survey 's hydrologic programs. (USGS)
Commercial Off-the-Shelf (COTS) Components and Enterprise Component Information System (eCIS)
DOE Office of Scientific and Technical Information (OSTI.GOV)
John Minihan; Ed Schmidt; Greg Enserro
The purpose of the project was to develop the processes for using commercial off-the-shelf (COTS) parts for WR production and to put in place a system for implementing the data management tools required to disseminate, store, track procurement, and qualify vendors. Much of the effort was devoted to determining if the use of COTS parts was possible. A basic question: How does the Nuclear Weapons Complex (NWC) begin to use COTS in the weapon Stockpile Life Extension Programs with high reliability, affordability, while managing risk at acceptable levels? In FY00, it was determined that a certain weapon refurbishment program couldmore » not be accomplished without the use of COTS components. The elements driving the use of COTS components included decreased cost, greater availability, and shorter delivery time. Key factors that required implementation included identifying the best suppliers and components, defining life cycles and predictions of obsolescence, testing the feasibility of using COTS components with a test contractor to ensure capability, as well as quality and reliability, and implementing the data management tools required to disseminate, store, track procurement, and qualify vendors. The primary effort of this project then was to concentrate on the risks involved in the use of COTS and address the issues of part and vendor selection, procurement and acceptance processes, and qualification of the parts via part and sample testing. The Enterprise Component Information System (eCIS) was used to manage the information generated by the COTS process. eCIS is a common interface for both the design and production of NWC components and systems integrating information between SNL National Laboratory (SNL) and the Kansas City Plant (KCP). The implementation of COTS components utilizes eCIS from part selection through qualification release. All part related data is linked across an unclassified network for access by both SNL and KCP personnel. The system includes not only NWC part information but also includes technical reference data for over 25 Million electronic and electromechanical commercial and military parts via a data subscription. With the capabilities added to the system through this project, eCIS provides decision support, parts list/BOM analysis, editing, tracking, workflows, reporting, and history/legacy information integrating manufacturer reference, company technical, company business, and design data.« less
Preliminary design activities for solar heating and cooling systems
NASA Technical Reports Server (NTRS)
1978-01-01
Information on the development of solar heating and cooling systems is presented. The major emphasis is placed on program organization, system size definition, site identification, system approaches, heat pump and equipment design, collector procurement, and other preliminary design activities.
An Implementation of Integrated Logistic Support for Turkish Armed Forces
1990-06-01
of systems available for sale by friendly countries. Usually the procurement decision is based upon procurement costs so the tendency is to buy the...result from various design alternatives. From the author’s personal experience, careful planning before buying a weapon system would have solved various...convincing the government of the long term advantages of buying the system which has the least life-cycle costs, especially when these costs are spread
Optimizing national immunization program supply chain management in Thailand: an economic analysis.
Riewpaiboon, A; Sooksriwong, C; Chaiyakunapruk, N; Tharmaphornpilas, P; Techathawat, S; Rookkapan, K; Rasdjarmrearnsook, A; Suraratdecha, C
2015-07-01
This study aimed to conduct an economic analysis of the transition of the conventional vaccine supply and logistics systems to the vendor managed inventory (VMI) system in Thailand. Cost analysis of health care program. An ingredients based approach was used to design the survey and collect data for an economic analysis of the immunization supply and logistics systems covering procurement, storage and distribution of vaccines from the central level to the lowest level of vaccine administration facility. Costs were presented in 2010 US dollar. The total cost of the vaccination program including cost of vaccine procured and logistics under the conventional system was US$0.60 per packed volume procured (cm(3)) and US$1.35 per dose procured compared to US$0.66 per packed volume procured (cm(3)) and US$1.43 per dose procured under the VMI system. However, the findings revealed that the transition to the VMI system and outsourcing of the supply chain system reduced the cost of immunization program at US$6.6 million per year because of reduction of un-opened vaccine wastage. The findings demonstrated that the new supply chain system would result in efficiency improvement and potential savings to the immunization program compared to the conventional system. Copyright © 2015 The Royal Society for Public Health. Published by Elsevier Ltd. All rights reserved.
Cross-national research on contractor evaluation procedures in public works procurement
NASA Astrophysics Data System (ADS)
Kinoshita, Seiya; Sato, Naoyoshi; Matsumoto, Naoya
Contractor evaluation methods in Japan's public works procurement, beginning with construction business licensure, going through biennial preliminary firm rating, up to project-by-project prequalification and comprehensive point rating, were developed during the period when public works were mostly procured through designated competitive bidding. It is essential to focus attention on contractor evaluation methods for introducing different types of procurement procedures which enhance the use of technological capabilities held by private businesses. An overall review of contractor evaluation procedures should be conducted in view of the present situation, where the open competitive bidding has become mainly used in combination with comprehensive evaluation, as well as to allow for further diversification of procurement methods. In Western countries, improvements have been made for the past several years in contractor evaluation procedures with more emphasis on "Value for Money." Advanced efforts made by these countries will be useful as a reference for overhauling Japan's contractor evaluation system. This study conducts a comparative review of contractor evaluation procedures for public procurement in Western countries such as the United States, the United Kingdom and France by identifying similarities and differences between those of Japan and the above mentioned countries. This reveals that a contractor's technical or professional ability is looked at separately from its economic and financial standing in those countries studied, and there is no case like Japan in which those two factors are integrated into one for evaluation.
48 CFR 52.250-4 - SAFETY Act Pre-qualification Designation Notice.
Code of Federal Regulations, 2010 CFR
2010-10-01
... attempts to use instrumentalities, weapons or other methods designed or intended to cause mass destruction... Technology (QATT) means any technology designed, developed, modified, procured, or sold for the purpose of... (including information technology) or any combination of the foregoing. Design services, consulting services...
Design, Fabrication, and Shakeout Testing of ATALANTE Dissolver Off-Gas Sorbent-Based Capture System
DOE Office of Scientific and Technical Information (OSTI.GOV)
Walker, Jr, Joseph Franklin; Jubin, Robert Thomas; Jordan, Jacob A.
A sorbent-based capture system designed for integration into the existing dissolver off-gas (DOG) treatment system at the ATelier Alpha et Laboratoires pour ANalyses, Transuraniens et Etudes de retraitement (ATALANTE) facility has been successfully designed and fabricated and has undergone shakeout testing. Discussions with personnel from the ATALANTE facility provided guidance that was used for the design. All components for this system were specified, procured, and received on site at Oak Ridge National Laboratory (ORNL). The system was then fabricated and tested at ORNL to verify operation. Shakeout testing resulted in a simplified system. This system should be easily installed intomore » the existing facility and should be straightforward to operate during future experimental testing. All parts were selected to be compatible with ATALANTE power supplies, space requirements, and the existing DOG treatment system. Additionally, the system was demonstrated to meet all of four design requirements. These include (1) a dissolver off-gas flow rate of ≤100 L/h (1.67 L/min), (2) an external temperature of ≤50°C for all system components placed in the hot cell, (3) a sorbent bed temperature of ~150°C, and (4) a gas temperature of ~150°C upon entry into the sorbent bed. The system will be ready for shipment and installation in the existing DOG treatment system at ATALANTE in FY 2016.« less
Assessing bone banking activities at University of Malaya medical centre.
Mohd, Suhaili; Samsuddin, Sharifah Mazni; Ramalingam, Saravana; Min, Ng Wuey; Yusof, Norimah; Zaman, T Kamarul; Mansor, Azura
2015-12-01
The main advantage of establishing in-house bone banks is its ability to readily provide allograft bones for local surgeries. Bone procurement activities of our university bone bank during the 10 years of operation were reviewed. Socio-demographic data of donors, types of bone procured, cases of rejected bones and types of allograft bones transplanted are presented. From 179 potential donors, 73 % were accepted with 213 procured bones. Femoral head was the common bone transplanted (45 %), as it was also the most common procured (82 %). Bones were rejected mainly due to non-technical reasons (83 %) rather than positive results of microbiological (13 %) and serological (4 %) tests. Comprehensive data could not be obtained for further analysis due to difficulties in retrieving information. Therefore, quality assurance system was improved to establish more systematic documentations, as the basis of good banking practice with process control hence allowing traceability.
40 CFR 86.1803-01 - Definitions.
Code of Federal Regulations, 2011 CFR
2011-07-01
... operator prior to procurement. Auxiliary Emission Control Device (AECD) means any element of design which... components are those components which are designed primarily for emission control, or whose failure may... of design means any control system (i.e., computer software, electronic control system, emission...
40 CFR 86.1803-01 - Definitions.
Code of Federal Regulations, 2012 CFR
2012-07-01
... prior to procurement. Auxiliary Emission Control Device (AECD) means any element of design which senses... components are those components which are designed primarily for emission control, or whose failure may... of design means any control system (i.e., computer software, electronic control system, emission...
7 CFR 3201.83 - Furniture cleaners and protectors.
Code of Federal Regulations, 2014 CFR
2014-01-01
... PROPERTY MANAGEMENT, DEPARTMENT OF AGRICULTURE GUIDELINES FOR DESIGNATING BIOBASED PRODUCTS FOR FEDERAL PROCUREMENT Designated Items § 3201.83 Furniture cleaners and protectors. (a) Definition. Products designed to clean and provide protection to the surfaces of household furniture other than the upholstery. (b...
7 CFR 3201.83 - Furniture cleaners and protectors.
Code of Federal Regulations, 2013 CFR
2013-01-01
... PROPERTY MANAGEMENT, DEPARTMENT OF AGRICULTURE GUIDELINES FOR DESIGNATING BIOBASED PRODUCTS FOR FEDERAL PROCUREMENT Designated Items § 3201.83 Furniture cleaners and protectors. (a) Definition. Products designed to clean and provide protection to the surfaces of household furniture other than the upholstery. (b...
7 CFR 2902.50 - Multipurpose cleaners.
Code of Federal Regulations, 2010 CFR
2010-01-01
..., DEPARTMENT OF AGRICULTURE GUIDELINES FOR DESIGNATING BIOBASED PRODUCTS FOR FEDERAL PROCUREMENT Designated Items § 2902.50 Multipurpose cleaners. (a) Definition. Products used to clean dirt, grease, and grime from a variety of items in both industrial and domestic settings. This designated item does not include...
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
The Procurement and Assistance Data System (PADS) provides a mechanism for collecting, assembling, organizing, and presenting acquisition and assistance data for the Department of Energy (DOE). This handbook and associated documents establish a uniform system to report acquisition/assistance data to PADS for the collection, processing, and dissemination of official statistical data on the Department`s acquisition and assistance actions. The data provides, based on information available at the time of request, a basis for any recurring and special reports to the senior procurement executive, Congress, General Accounting Office (GAO), Federal executive agencies, Office of management and Budget (OMB), and the generalmore » public. It provides information for measuring and assessing the extent to which small business firms and small disadvantages business enterprises are sharing in DOE placement, and for other acquisition and assistance policy and management control purposes. The Handbook for the Preparation of the Individual Procurement Action Report (IPAR) has been designed in two sections; Procurement and Financial Assistance to support the individual forms.« less
41 CFR 101-26.506-1 - Types of service.
Code of Federal Regulations, 2010 CFR
2010-07-01
... PROGRAM 26.5-GSA Procurement Programs § 101-26.506-1 Types of service. GSA interior planning and design...; softline space plans; development of an interior design program (to include finish materials, furniture and...
Design data brochure: SIMS prototype system 3
NASA Technical Reports Server (NTRS)
1978-01-01
A closed hydronic solar system is reported for space and hot water heating. Design, performance, and hardware specifications are presented sufficient for architectural engineers and contractors to procure, install, operate, and maintain a similar solar application.
Online Learning Flight Control for Intelligent Flight Control Systems (IFCS)
NASA Technical Reports Server (NTRS)
Niewoehner, Kevin R.; Carter, John (Technical Monitor)
2001-01-01
The research accomplishments for the cooperative agreement 'Online Learning Flight Control for Intelligent Flight Control Systems (IFCS)' include the following: (1) previous IFC program data collection and analysis; (2) IFC program support site (configured IFC systems support network, configured Tornado/VxWorks OS development system, made Configuration and Documentation Management Systems Internet accessible); (3) Airborne Research Test Systems (ARTS) II Hardware (developed hardware requirements specification, developing environmental testing requirements, hardware design, and hardware design development); (4) ARTS II software development laboratory unit (procurement of lab style hardware, configured lab style hardware, and designed interface module equivalent to ARTS II faceplate); (5) program support documentation (developed software development plan, configuration management plan, and software verification and validation plan); (6) LWR algorithm analysis (performed timing and profiling on algorithm); (7) pre-trained neural network analysis; (8) Dynamic Cell Structures (DCS) Neural Network Analysis (performing timing and profiling on algorithm); and (9) conducted technical interchange and quarterly meetings to define IFC research goals.
Wells, Christopher J.; Alano, Abraham
2013-01-01
Introduction Risky sexual behavior among Ethiopian university students, especially females, is a major contributor to young adult morbidity and mortality. Ambaw et al. found that female university students in Ethiopia may fear the humiliation associated with procuring condoms. A study in Thailand suggests condom machines may provide comfortable condom procurement, but the relevance to a high-risk African context is unknown. The objective of this study was to examine if the installation of condom machines in Ethiopia predicts changes in student condom uptake and use, as well as changes in procurement related stigma. Methods Students at a large urban university in Southern Ethiopia completed self reported surveys in 2010 (N = 2,155 surveys) and again in 2011 (N = 2,000), six months after the installation of condom machines. Mann-Whitney and Chi-square tests were conducted to evaluate significant changes in student sexual behavior, as well as condom procurement and associated stigma over the subsequent one year period. Results After installing condom machines, the average number of trips made to procure condoms on-campus significantly increased 101% for sexually active females and significantly decreased 36% for sexually active males. Additionally, reports of condom use during last sexual intercourse showed a non-significant 4.3% increase for females and a significant 9.0% increase for males. During this time, comfort procuring condoms and ability to convince sexual partners to use condoms were significantly higher for sexually active male students. There was no evidence that the condom machines led to an increase in promiscuity. Conclusions The results suggest that condom machines may be associated with more condom procurement among vulnerable female students in Ethiopia and could be an important component of a comprehensive university health policy. PMID:23565272
40 CFR 86.1803-01 - Definitions.
Code of Federal Regulations, 2013 CFR
2013-07-01
... procurement. Auxiliary Emission Control Device (AECD) means any element of design which senses temperature... components are those components which are designed primarily for emission control, or whose failure may... system as a means of providing electrical energy. Element of design means any control system (i.e...
Power Supply Changes for NSTX Resistive Wall Mode Coils
DOE Office of Scientific and Technical Information (OSTI.GOV)
Ramakrishnan, S S.
The National Spherical Torus Experiment (NSTX) has been designed and installed in the existing facilities at Princeton Plasma Physics Laboratory (PPPL). Most of the hardware, plant facilities, auxiliary sub-systems, and power systems originally used for the Tokamak Fusion Test Reactor (TFTR) have been used with suitable modifications to reflect NSTX needs. Prior to 2004, the NSTX power system was feeding twelve (12) circuits in the machine. In 2004 the Resistive Wall Mode (RWM) Coils were installed on the machine to correct error fields. There are six of these coils installed around the machine in the mid-plane. Since these coils needmore » fast and accurate controls, a Switching Power Amplifier (SPA) with three sub-units was procured, installed and commissioned along with other power loop components. Two RWM Coils were connected in series and fed from one SPA sub-unit. After the initial RWM campaign, operational requirements evolved such that each of the RWM coils now requires separate power and control. Hence a second SPA with three sub-units has been procured and installed. The second unit is of improved design and has the controls and power components completely isolated. The existing thyristor rectifier is used as DC Link to both of the Switching Power Amplifiers. The controls for the RWM are integrated into the overall computer control of the DC Power systems for NSTX. This paper describes the design changes in the RWM Power system for NSTX.« less
NASA Technical Reports Server (NTRS)
Delaney, C. L.
1984-01-01
The test and evaluation program on shale derived fuel being conducted by the Air Force is intended to accomplish the minimum amount of testing necessary to assure both the safe use of shale oil derived turbine fuels in operational USAF aircraft and its compatibility with USAF handling systems. This program, which was designed to take advantage of existing R&D testing programs, began in 1981. However, due to a problem in acquiring the necessary fuel, the testing program was suspended until July 1983 when an additional sample of shale derived fuel was received. Tentatively, the Air Force is planning to make three relatively minor revisions to the procurement specifications requirements for the production shale derived fuel. These are: (1) Aromatic Contest (min) - 9% (by volume); (2) Nitrogen (max - 20 ppm by weight); and (3) Antioxidants - 9.1 g/100 gal (U.S.)
Consolidated fuel reprocessing program
NASA Astrophysics Data System (ADS)
1985-02-01
Improved processes and components for the Breeder Reprocessing Engineering Test (BRET) were identified and developed as well as the design, procurement and development of prototypic equipment. The integrated testing of process equipment and flowsheets prototypical of a pilot scale full reprocessing plant, and also for testing prototypical remote features of specific complex components in the system are provided. Information to guide the long range activities of the Consolidated Fuel Reprocessing Program (CERP), a focal point for foreign exchange activities, and support in specialized technical areas are described. Research and development activities in HTGR fuel treatment technology are being conducted. Head-end process and laboratory scale development efforts, as well as studies specific to HTGR fuel, are reported. The development of off-gas treatment processes has generic application to fuel reprocessing, progress in this work is also reported.
User evaluation of photovoltaic-powered vaccine refrigerator/freezer systems
NASA Technical Reports Server (NTRS)
Ratajczak, Anthony F.
1987-01-01
The NASA Lewis Research Center has concluded a project to develop and field test photovoltaic-powered refrigerator/freezers for vaccine storage in remote areas of developing countries. As a conclusion to this project, questionnaires were sent to the in-country administrators for each test site probing user acceptance of the systems and attitudes regarding procurement of additional systems. Responses indicate that the systems had a positive effect on the local communities, that they made a positive impression on the local health authorities, and that system cost and scarcity of funds are the major barriers to procurements of additional systems.
User evaluation of photovoltaic-powered vaccine refrigerator/freezer systems
NASA Astrophysics Data System (ADS)
Ratajczak, Anthony F.
1987-03-01
The NASA Lewis Research Center has concluded a project to develop and field test photovoltaic-powered refrigerator/freezers for vaccine storage in remote areas of developing countries. As a conclusion to this project, questionnaires were sent to the in-country administrators for each test site probing user acceptance of the systems and attitudes regarding procurement of additional systems. Responses indicate that the systems had a positive effect on the local communities, that they made a positive impression on the local health authorities, and that system cost and scarcity of funds are the major barriers to procurements of additional systems.
Burp Charging Nickel Metal Hydride Cells
NASA Technical Reports Server (NTRS)
Darcy, Eric; Pollard, Richard
1997-01-01
The SKYNET 4 constellation consists of three spacecraft which were launched between December 1988 and August 1990. The spacecraft are three-axis stabilized geostationary earth-orbiting military communications satellites with a design life of seven years on station. With the mission objective achieved all the batteries continue to give excellent performance. This paper presents a review of the history of the six batteries from cell procurement to the end of their design life and beyond. Differences in operational strategies are discussed and the lifetime trends in performance are analyzed. The combination of procurement acceptance criteria and the on-station battery management strategy utilized are presented as the prime factors in achieving completely successful battery performance throughout the mission.
Sosin, Michael; Ceradini, Daniel J; Hazen, Alexes; Sweeney, Nicole G; Brecht, Lawrence E; Levine, Jamie P; Staffenberg, David A; Saadeh, Pierre B; Bernstein, G Leslie; Rodriguez, Eduardo D
2016-05-01
Cadaveric face transplant models are routinely used for technical allograft design, perfusion assessment, and transplant simulation but are associated with substantial limitations. The purpose of this study was to describe the experience of implementing a translational donor research facial procurement and solid organ allograft recovery model. Institutional review board approval was obtained, and a 49-year-old, brain-dead donor was identified for facial vascularized composite allograft research procurement. The family generously consented to donation of solid organs and the total face, eyelids, ears, scalp, and skeletal subunit allograft. The successful sequence of computed tomographic scanning, fabrication and postprocessing of patient-specific cutting guides, tracheostomy placement, preoperative fluorescent angiography, silicone mask facial impression, donor facial allograft recovery, postprocurement fluorescent angiography, and successful recovery of kidneys and liver occurred without any donor instability. Preservation of the bilateral external carotid arteries, facial arteries, occipital arteries, and bilateral thyrolinguofacial and internal jugular veins provided reliable and robust perfusion to the entirety of the allograft. Total time of facial procurement was 10 hours 57 minutes. Essential to clinical face transplant outcomes is the preparedness of the institution, multidisciplinary face transplant team, organ procurement organization, and solid organ transplant colleagues. A translational facial research procurement and solid organ recovery model serves as an educational experience to modify processes and address procedural, anatomical, and logistical concerns for institutions developing a clinical face transplantation program. This methodical approach best simulates the stressors and challenges that can be expected during clinical face transplantation. Therapeutic, V.
Results of module electrical measurement of the DOE 46-kilowatt procurement
NASA Technical Reports Server (NTRS)
Curtis, H. B.
1978-01-01
Current-voltage measurements have been made on terrestrial solar cell modules of the DOE/JPL Low Cost Silicon Solar Array procurement. Data on short circuit current, open circuit voltage, and maximum power for the four types of modules are presented in normalized form, showing distribution of the measured values. Standard deviations from the mean values are also given. Tests of the statistical significance of the data are discussed.
Annexin II-Dependent Mechanism of Breast Cancer Progression
2010-11-01
of the effects of tranexamic acid and urokinase on metastasis of Lewis lung carcinoma. Br. J. Cancer 46, 428–435. Tarui, T., et al., 2002. Plasmin...Lysine–Sepharose and ε- aminocaproic acid (ε-ACA)were procured from Sigma (St. Louis, MO). Chromatography and electrophoretic reagents were procured from...μl) with medium containing 10% fetal bovine serum (FBS). Test reagents (plasminogen, plasmin, angiostatin, ε-aminocaproic acid , or antibo- dies) were
NASA Astrophysics Data System (ADS)
Ross, M.; Knab, L.
1984-07-01
The selection, procurement, and description of the Salem Limestone to be used in field exposure tests to assess the effects of acid rain on building stone are described. The rationale for choosing Salem Limestone is given and a brief geological description of the stone is provided. Preparation of the stone samples for field exposure, including cutting, surface finishing and labelling is presented.
41 CFR 101-26.506 - Interior planning and design services.
Code of Federal Regulations, 2013 CFR
2013-07-01
... design services. 101-26.506 Section 101-26.506 Public Contracts and Property Management Federal Property... SOURCES AND PROGRAM 26.5-GSA Procurement Programs § 101-26.506 Interior planning and design services. In... various phases of interior planning and design. These services will be provided either directly or through...
41 CFR 101-26.506 - Interior planning and design services.
Code of Federal Regulations, 2012 CFR
2012-07-01
... design services. 101-26.506 Section 101-26.506 Public Contracts and Property Management Federal Property... SOURCES AND PROGRAM 26.5-GSA Procurement Programs § 101-26.506 Interior planning and design services. In... various phases of interior planning and design. These services will be provided either directly or through...
41 CFR 101-26.506 - Interior planning and design services.
Code of Federal Regulations, 2011 CFR
2011-07-01
... design services. 101-26.506 Section 101-26.506 Public Contracts and Property Management Federal Property... SOURCES AND PROGRAM 26.5-GSA Procurement Programs § 101-26.506 Interior planning and design services. In... various phases of interior planning and design. These services will be provided either directly or through...
41 CFR 101-26.506 - Interior planning and design services.
Code of Federal Regulations, 2014 CFR
2014-07-01
... design services. 101-26.506 Section 101-26.506 Public Contracts and Property Management Federal Property... SOURCES AND PROGRAM 26.5-GSA Procurement Programs § 101-26.506 Interior planning and design services. In... various phases of interior planning and design. These services will be provided either directly or through...
Functional performance of pyrovalves
NASA Technical Reports Server (NTRS)
Bement, Laurence J.
1996-01-01
Following several flight and ground test failures of spacecraft systems using single-shot, 'normally closed' pyrotechnically actuated valves (pyrovalves), a Government/Industry cooperative program was initiated to assess the functional performance of five qualified designs. The goal of the program was to provide information on functional performance of pyrovalves to allow users the opportunity to improve procurement requirements. Specific objectives included the demonstration of performance test methods, the seating; these gases/particles entered the fluid path of measurement of 'blowby' (the passage of gases from the pyrotechnic energy source around the activating piston into the valve's fluid path), and the quantification of functional margins for each design. Experiments were conducted at NASA's Langley Research Center on several units for each of the five valve designs. The test methods used for this program measured the forces and energies required to actuate the valves, as well as the energies and the pressures (where possible) delivered by the pyrotechnic sources. Functional performance ranged widely among the designs. Blowby cannot be prevented by o-ring seals; metal-to-metal seals were effective. Functional margin was determined by dividing the energy delivered by the pyrotechnic sources in excess to that required to accomplish the function by the energy required for that function. Two of the five designs had inadequate functional margins with the pyrotechnic cartridges evaluated.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Morrow, J.J.; Burris, R.A.; Watson, D.J.
1977-05-01
This report is intended to provide guidelines for the preparation of procurements specifications for aircraft survivability enhancement equipment, for the survivability/vulnerability (S/V) tasks associated with the procurement of a total aircraft system or its relate subsystems, and also for the modification of current fleet aircraft to their related subsystems. It is intended that these S/V procurement guidelines be applied to the procurement of all military aircraft, aircraft subsystems, and aircraft componenets which can either lose their functional capability of have their performance degraded as a result of interactions with the damage mechanisms of threat weapons. The guidelines should be appliedmore » to preliminary design programs, to production programs, and to programs that will retrofit or modify existing systems. These guidelines include general requirements statements for the establishment of an S/V program, requirements statements for reducing the susceptibility of the system to the threat weapons, and requirements for the reduction of vulnerability to nonnuclear, nuclear, and laser weapon effects. Requirements for S/V assessments and the verification of vulnerability levels and survival enhancement features are also included. Although nuclear and laser weapon effects are included, the major emphasis is on the reduction of susceptibility and vulnerability to conventional weapons and the establishment of the S/V program.« less
Sztam, Kevin A; Ndirangu, Murugi; Sheriff, Muhsin; Arpadi, Stephen M; Hawken, Mark; Rashid, Juma; Deckelbaum, Richard J; El Sadr, Wafaa M
2013-01-01
Poor nutritional status at initiation of antiretroviral therapy (ART) is predictive of mortality. Decreased dietary intake is a major determinant of weight loss in HIV. Despite a biological rationale to treat undernutrition in adults receiving ART, few studies have provided data on feasibility, safety, effectiveness, and sustainability of specific macronutrient supplements with HIV treatment in adults, especially supplements such as a food basket, a supplement approach seldom evaluated in spite of its wide use. We present the rationale and design for a study of a locally procured macronutrient supplement given to HIV-infected patients initiating ART with a body mass index (BMI) ≤20.0 kg/m(2). The objective was to determine feasibility of procurement, distribution, safety and to obtain preliminary effectiveness data for a locally procured supplement. The design was a comparative study for 200 adult participants at two Kenya government-supported clinics. The primary outcome was BMI at 24 weeks. Supplement duration was 24 weeks, total follow-up was 48 weeks, and the study included a comparison site. Novel aspects of this study include use of a standardized macronutrient supplement to protect the participant against household food sharing, and a complementary micronutrient supplement. Comprehensive data collected included dietary intake, HIV-related quality-of-life, food security, neuropsychiatric assessments, laboratory studies, and household geomapping. Assessments were made at baseline, at 24 weeks, and at 48 weeks post-ART initiation. Challenges included establishing a partnership with local millers, distribution from the HIV clinic, food safety, and tracking of participants. These findings will help inform nutrition support programming in Kenya and similar settings, and provide needed data regarding use of macronutrient supplements as an adjunctive intervention with ART.
NASA Technical Reports Server (NTRS)
1973-01-01
The manufacturing tasks for the program included the fabrication and assembly of an epoxy fiberglass purge bag to encapsulate an insulated cryogenic propellant tank. Purge, repressurization and venting hardware were procured and installed on the purge bag assembly in preparation for performance testing. The fabrication and installation of the superfloc multilayer insulation (MLI) on the cryogenic tank was accomplished as part of a continuing program. An abstraction of the results of the MLI fabrication task is included to describe the complete fabrication requirements for a reusable cryogenic propellant space storage system.
Interleaved arrays antenna technology development
NASA Technical Reports Server (NTRS)
1986-01-01
Phase one and two of a program to further develop and investigate advanced graphite epoxy waveguides, radiators, and components with application to space antennas are discussed. The objective of the two phases were to demonstrate mechanical integrity of a small panel of radiators and parts procured under a previous contract and to develop alternate designs and applications of the technology. Most of the emphasis was on the assembly and test of a 5 x 5 element module. This effort was supported by evaluation of adhesives and waveguide joint configurations. The evaluation and final assembly considered not only mechanical performance but also producibility in large scale.
The Calculation of the Heat Required for Wing Thermal Ice Prevention in Specified Icing Conditions
NASA Technical Reports Server (NTRS)
Bergrun, Norman R.; Jukoff, David; Schlaff, Bernard A.; Neel, Carr B., Jr.
1947-01-01
Flight tests were made in natural icing conditions with two 8-ft-chord heated airfoils of different sections. Measurements of meteorological variables conducive to ice formation were made simultaneously with the procurement of airfoil thermal data. The extent of knowledge on the meteorology of icing, the impingement of water drops on airfoil surfaces, and the processes of heat transfer and evaporation from a wetted airfoil surface have been increased to a point where the design of heated wings on a fundamental, wet-air basis now can be undertaken with reasonable certainty.
1988-09-01
designed to compare the performance of grade 15W-40 (OE/HDO- 15/40), grade 40 (OE/HDO-40), and SAE -50 grade lubricants in M60 battle tanks and to verify...throughout the test period. Company A was to continue to use SAE -50 grade oil, Company B was to receive an OEIHDO-l3I40 oil, and Company C was to be...Company A procured the SAE -nO grade oil thdrough normal supply channels. 2 Each tank company was to follow regularly scheduled training cycles so that by
7 CFR 3201.17 - Plastic insulating foam for residential and commercial construction.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 7 Agriculture 15 2014-01-01 2014-01-01 false Plastic insulating foam for residential and... DESIGNATING BIOBASED PRODUCTS FOR FEDERAL PROCUREMENT Designated Items § 3201.17 Plastic insulating foam for residential and commercial construction. (a) Definition. Spray-in-place plastic foam products designed to...
7 CFR 3201.17 - Plastic insulating foam for residential and commercial construction.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 7 Agriculture 15 2012-01-01 2012-01-01 false Plastic insulating foam for residential and... DESIGNATING BIOBASED PRODUCTS FOR FEDERAL PROCUREMENT Designated Items § 3201.17 Plastic insulating foam for residential and commercial construction. (a) Definition. Spray-in-place plastic foam products designed to...
7 CFR 3201.17 - Plastic insulating foam for residential and commercial construction.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 7 Agriculture 15 2013-01-01 2013-01-01 false Plastic insulating foam for residential and... DESIGNATING BIOBASED PRODUCTS FOR FEDERAL PROCUREMENT Designated Items § 3201.17 Plastic insulating foam for residential and commercial construction. (a) Definition. Spray-in-place plastic foam products designed to...
Dual-Use Partnership Addresses Performance Problems with "Y" Pattern Control Valves
NASA Technical Reports Server (NTRS)
Bailey, John W.
2004-01-01
A Dual-Use Cooperative Agreement between the Propulsion Test Directorate (PTD) at Stennis Space Center (SSC) and Oceaneering Reflange, Inc. of Houston, TX has produced an improved 'Y' pattern split-body control valve for use in the propulsion test facilities at Stennis Space Center. The split-body, or clamped bonnet technology, provides for a 'cleaner' valve design featuring enhanced performance and increased flow capacity with extended life expectancy. Other points addressed by the partnership include size, weight and costs. Overall size and weight of each valve will be reduced by 50% compared to valves currently in use at SSC. An initial procurement of two 10 inch valves will result in an overall cost reduction of 15% or approximately $50,000 per valve.
Design data brochure: SIMS prototype system 2
NASA Technical Reports Server (NTRS)
1977-01-01
Information is provided on the design and performance of the IBM SIMS Prototype System 2, solar domestic hot water system, for single family residences. The document provides sufficient data to permit procurement, installation, operation, and maintenance by qualified architectural engineers or contractors.
DOT National Transportation Integrated Search
2000-03-01
Procurement of Intelligent Transportation System (ITS) projects using Federal-aid funds can present challenges that are not typically observed in traditional transportation projects. Many roadway improvement projects involve the two-step "Design-Bid-...
1980-01-01
10-0 6 EL4 -022 8L LLý 0 0 a 0 CLcc - 3 E CL 0 ;i *1 XO go10 ,* . , -8 rt -C CL.* L. OLc L ’i go 0 0 0 L +1%- 00 00I :) I.- I - - 51 .0 Cc a,,0 c0...of Test Cells M34 and M35. The bldg will be a prefabri- cated steel structure with several work stations. The work stations will have hoist systems...mate/demate the engine to its mount. The work stations will incorporate cell type interfaces for a limited checkout of engine in- strumentation. These
Next Generation Loading System for Detonators and Primers
Designed , fabricated and installed next generation tooling to provide additional manufacturing capabilities for new detonators and other small...prototype munitions on automated, semi-automated and manual machines. Lead design effort, procured and installed a primary explosive Drying Oven for a pilot...facility. Designed , fabricated and installed a Primary Explosives Waste Treatment System in a pilot environmental processing facility. Designed
Tang, Yuqing; Liu, Chaojie; Liu, Junjie; Zhang, Xinping; Zuo, Keyuan
2018-08-01
The overuse of antibiotics has become a major public health challenge worldwide, especially in low- and middle-income countries, including China. In 2009, the Chinese government launched a series of measures to de-incentivise over-prescription in public health facilities, including decoupling the link between facility income and the sale of medicines. We evaluated the effects of these measures on procurement costs and the volume of antibiotics in county public hospitals. The study was undertaken in the Hubei province of China, where 64 county public hospitals implemented the reform in sequence at three different stages. A quasi-natural experiment design was employed. We performed generalised linear regressions with a difference-in-differences approach using 22,713 procurement records of antibiotics from November 2014 to December 2016. The regression results showed that the reform contributed to a 14.79% increase in total costs for antibiotics (p = 0.013), particularly costs for injectable antibiotics (p = 0.022) and first-line antibiotics (p = 0.030). The procurement prices for antibiotics remained largely comparable to those in the control group, but the reform led to a 17.30% increase in the procurement volume (expressed as defined daily doses) of second-line antibiotics (p = 0.032). County public hospitals procured more antibiotics and greater numbers of expensive antibiotics, such as those administered via injection, to compensate for the loss of income from the sale of medicines, leading to an increased total cost of antibiotics.
NASA Astrophysics Data System (ADS)
Ramantoko, Gadang; Irawan, Herry
2017-10-01
This research examines the factors influencing the Information Sharing Model in Supporting Implementation of e-Procurement Services: Case of Bandung City in its early maturity stage. The early maturity of information sharing stage was determined using e-Government Maturity Stage Conceptual Framework from Estevez. Bandung City e-Procurement Information Sharing system was categorized at stage 1 in Estevez' model where the concern was mainly on assessing the benefit and risk of implementing the system. The Authors were using DeLone & McLean (D&M) Information System Success model to study benefit and risk of implementing the system in Bandung city. The model was then empirically tested by employing survey data that was collected from the available 40 listed supplier firms. D&M's model adjusted by Klischewski's description was introducing Information Quality, System Quality, and Service Quality as independent variable; Usability and User Satisfaction as intermediate dependent variable; and Perceived Net Benefit as final dependent variable. The findings suggested that, all of the predictors in D&M's model significantly influenced the net perceived benefit of implementing the e-Procurement system in the early maturity stage. The theoretical contribution of this research suggested that D&M's model might find useful in modeling complex information technology successfulness such as the one used in e-Procurement service. This research could also have implications for policy makers (LPSE) and system providers (LKPP) following the introduction of the service. However, the small number of respondent might be considered limitation of the study. The model needs to be further tested using larger number of respondents by involving the population of the firms in extended boundary/municipality area around Bandung.
41 CFR 101-26.506 - Interior planning and design services.
Code of Federal Regulations, 2010 CFR
2010-07-01
... SOURCES AND PROGRAM 26.5-GSA Procurement Programs § 101-26.506 Interior planning and design services. In... various phases of interior planning and design. These services will be provided either directly or through... 41 Public Contracts and Property Management 2 2010-07-01 2010-07-01 true Interior planning and...
HSCT Sector Combustor Evaluations for Demonstration Engine
NASA Technical Reports Server (NTRS)
Greenfield, Stuart; Heberling, Paul; Kastl, John; Matulaitis, John; Huff, Cynthia
2004-01-01
In LET Task 10, critical development issues of the HSCT lean-burn low emissions combustor were addressed with a range of engineering tools. Laser diagnostics and CFD analysis were applied to develop a clearer understanding of the fuel-air premixing process and premixed combustion. Subcomponent tests evaluated the emissions and operability performance of the fuel-air premixers. Sector combustor tests evaluated the performance of the integrated combustor system. A 3-cup sector was designed and procured for laser diagnostics studies at NASA Glenn. The results of these efforts supported the earlier selection of the Cyclone Swirler as the pilot stage premixer and the IMFH (Integrated Mixer Flame Holder) tube as the main stage premixer of the LPP combustor. In the combustor system preliminary design subtask, initial efforts to transform the sector combustor design into a practical subscale engine combustor met with significant challenges. Concerns about the durability of a stepped combustor dome and the need for a removable fuel injection system resulted in the invention and refinement of the MRA (Multistage Radial Axial) combustor system in 1994. The MRA combustor was selected for the HSR Phase II LPP subscale combustor testing in the CPC Program.
Automation and Upgrade of Thermal System for Large 38-Year-Young Test Facility
NASA Technical Reports Server (NTRS)
Webb, Andrew T.; Powers, Edward I. (Technical Monitor)
2000-01-01
The Goddard Space Flight Center's Space Environment Simulator (SES) facility has been improved by the upgrade of its thermal control hardware and software. This paper describes the preliminary design process, funding constraints, and the proposed enhancements as well as the installation details, the testing difficulties, and the overall benefits realized from this upgrade. The preliminary design process was discussed in a paper presented in October 1996 and will be recapped in this paper to provide background and comparison to actual product. Structuring the procurement process to match the funding constraints allowed Goddard to enhance its capabilities in an environment of reduced budgets. The installation of the new system into a location that has been occupied for over 38 years was one of the driving design factors for the size of the equipment. The installation was completed on time and under budget. The tuning of the automatic sequences for the new thermal system to the existing shroud system required more time and ultimately presented some setbacks to the vendor and the final completion of the system. However, the end product and its benefits to Goddard's thermal vacuum test portfolio will carry the usefulness of this facility well into the next century.
Automation and Upgrade of Thermal System for Large 38-Year Young Test Facility
NASA Technical Reports Server (NTRS)
Webb, Andrew
2000-01-01
The Goddard Space Flight Center's Space Environment Simulator (SES) facility has been improved by the upgrade of its thermal control hardware and software. This paper describes the preliminary design process, funding constraints, and the proposed enhancements as well as the installation details, the testing difficulties, and the overall benefits realized from this upgrade. The preliminary design process was discussed in a paper presented in October 1996 and will be recapped in this paper to provide background and comparison to actual product. Structuring the procurement process to match the funding constraints allowed Goddard to enhance its capabilities in an environment of reduced budgets. The installation of the new system into a location that has been occupied for over 38-years was one of the driving design factors for the size of the equipment. The installation was completed on-time and under budget. The tuning of the automatic sequences for the new thermal system to the existing shroud system required more time and ultimately presented some setbacks to the vendor and the final completion of the system. However, the end product and its benefits to Goddard's thermal vacuum test portfolio will carry the usefulness of this facility well into the next century.
Commercial grade item (CGI) dedication of generators for nuclear safety related applications
DOE Office of Scientific and Technical Information (OSTI.GOV)
Das, R.K.; Hajos, L.G.
1993-03-01
The number of nuclear safety related equipment suppliers and the availability of spare and replacement parts designed specifically for nuclear safety related application are shrinking rapidly. These have made it necessary for utilities to apply commercial grade spare and replacement parts in nuclear safety related applications after implementing proper acceptance and dedication process to verify that such items conform with the requirements of their use in nuclear safety related application. The general guidelines for the commercial grade item (CGI) acceptance and dedication are provided in US Nuclear Regulatory Commission (NRC) Generic Letters and Electric Power Research Institute (EPRI) Report NP-5652,more » Guideline for the Utilization of Commercial Grade Items in Nuclear Safety Related Applications. This paper presents an application of these generic guidelines for procurement, acceptance, and dedication of a commercial grade generator for use as a standby generator at Salem Generating Station Units 1 and 2. The paper identifies the critical characteristics of the generator which once verified, will provide reasonable assurance that the generator will perform its intended safety function. The paper also delineates the method of verification of the critical characteristics through tests and provide acceptance criteria for the test results. The methodology presented in this paper may be used as specific guidelines for reliable and cost effective procurement and dedication of commercial grade generators for use as standby generators at nuclear power plants.« less
NASA Technical Reports Server (NTRS)
Ramos, Alberto
2011-01-01
Projects assigned to: (1) Testing, fixing, and procuring enclosure systems and components for Kennedy Ground Controls Systems at launch pad B. (2) Organizational spreadsheets for all subsystems involved in the project. (Procurement, parts lists, drawings, purchase requests, etc) (3) Resolve is a project devoted to the lunar rover that will sample lunar soil in an effort to remove the moister and separate the metal from the oxygen to produce drinkable water. I helped with the humidity environmental generator for the experiment (moister detector).
DOE Office of Scientific and Technical Information (OSTI.GOV)
Rapoza, R.J.; Vollmer, H.R.; Haberly, K.L.
1992-11-01
Fiberglass reinforced plastic (FRP) materials offer excellent corrosion-resistant properties and long-term cost advantages compared to exotic alloys or organic lining systems. This guideline document provides potential buyers of FRP FGD (flue gas desulfurization) equipment with enough knowledge of FRP materials and methods to make informed decisions when procuring FRP equipment or services. It is divided into the following chapters: application criteria, procurement strategies, FRP basics, guidelines for designing FRP equipment, quality management. A glossary and manufacturers information/recommendations are included.
NASA Technical Reports Server (NTRS)
Virmani, Nick; Shaw, Jack
1997-01-01
Some of the concerns and risk mitigation procedures for using plastic encapsulated microcircuits (PEMs) for space applications are discussed. Despite their advantages, PEMs cannot be implemented in all space applications by replacing military parts numbers with their commercial counterparts in product designs and part lists. The technical and procurement concerns are summarized, and suggestions for high reliability procurements are given. The ability to withstand deleterious environmental effects and to meet mission critical reliability is the key to the successful use of PEMs for space applications.
The role of clinical nurse educators in organ procurement organizations.
Swain, Sharon
2011-12-01
Clinical nurse educators are advanced practice nurses with preparation at the master's level or higher. Such nurses play an important role in organ procurement organizations. As leaders and members of the team, they provide structure and design to the training process. These educators oversee orientation of new employees, serve as mentors to preceptors, assess the learning needs of the organization, and provide ongoing training to veteran staff. Clinical nurse educators also contribute to continuous quality improvement for the organization and help to comply with regulatory standards.
Certificate of Current Cost or Pricing Data Construction Specific Forms Pre-Award Documents Construction and manuals) Cost and Pricing Data Definitions Design-Build / Price Proposal Form Information
40 CFR 247.11 - Vehicular products.
Code of Federal Regulations, 2014 CFR
2014-07-01
... PROCUREMENT GUIDELINE FOR PRODUCTS CONTAINING RECOVERED MATERIALS Item Designations § 247.11 Vehicular... fluids, and gear oils, excluding marine and aviation oils. (b) Tires, excluding airplane tires. (c...
40 CFR 247.11 - Vehicular products.
Code of Federal Regulations, 2012 CFR
2012-07-01
... PROCUREMENT GUIDELINE FOR PRODUCTS CONTAINING RECOVERED MATERIALS Item Designations § 247.11 Vehicular... fluids, and gear oils, excluding marine and aviation oils. (b) Tires, excluding airplane tires. (c...
40 CFR 247.11 - Vehicular products.
Code of Federal Regulations, 2013 CFR
2013-07-01
... PROCUREMENT GUIDELINE FOR PRODUCTS CONTAINING RECOVERED MATERIALS Item Designations § 247.11 Vehicular... fluids, and gear oils, excluding marine and aviation oils. (b) Tires, excluding airplane tires. (c...
7 CFR 3201.77 - Asphalt restorers.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 7 Agriculture 15 2014-01-01 2014-01-01 false Asphalt restorers. 3201.77 Section 3201.77... Designated Items § 3201.77 Asphalt restorers. (a) Definition. Products designed to seal, protect, or restore poured asphalt and concrete surfaces. (b) Minimum biobased content. The Federal preferred procurement...
7 CFR 3201.77 - Asphalt restorers.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 7 Agriculture 15 2013-01-01 2013-01-01 false Asphalt restorers. 3201.77 Section 3201.77... Designated Items § 3201.77 Asphalt restorers. (a) Definition. Products designed to seal, protect, or restore poured asphalt and concrete surfaces. (b) Minimum biobased content. The Federal preferred procurement...
7 CFR 3201.44 - Corrosion preventatives.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 7 Agriculture 15 2012-01-01 2012-01-01 false Corrosion preventatives. 3201.44 Section 3201.44... Designated Items § 3201.44 Corrosion preventatives. (a) Definition. Products designed to prevent the deterioration (corrosion) of metals. (b) Minimum biobased content. The preferred procurement product must have a...
7 CFR 3201.44 - Corrosion preventatives.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 7 Agriculture 15 2014-01-01 2014-01-01 false Corrosion preventatives. 3201.44 Section 3201.44... Designated Items § 3201.44 Corrosion preventatives. (a) Definition. Products designed to prevent the deterioration (corrosion) of metals. (b) Minimum biobased content. The preferred procurement product must have a...
7 CFR 3201.44 - Corrosion preventatives.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 7 Agriculture 15 2013-01-01 2013-01-01 false Corrosion preventatives. 3201.44 Section 3201.44... Designated Items § 3201.44 Corrosion preventatives. (a) Definition. Products designed to prevent the deterioration (corrosion) of metals. (b) Minimum biobased content. The preferred procurement product must have a...
DOT National Transportation Integrated Search
2012-09-01
The overall objective of this research project is to develop a systematic approach that evaluates the appropriateness of Design Build Project Delivery System for a transportation project. State DOTs can benefit from this systematic assessment approac...
Using a Standardized Donor Ratio to Assess Organ Procurement Organizations
Stogis, Sheryl; Hirth, Richard A; Strawderman, Robert L; Banaszak-Holl, Jane; Smith, Dean G
2002-01-01
Objective To develop a Standardized Donor Ratio (SDR) as an outcome measure for evaluating the effectiveness of organ procurement organizations (OPOs). Data Sources/Study Setting All deaths by cause in the United States during 1993–1994 as reported in the Vital Mortality Statistics, Multiple Cause of Death files. The OPO-specific data were provided by the United Network for Organ Sharing (UNOS). Study Design Each OPO's expected number of donors was calculated by applying national donation rates to deaths with potential for donation in 24 age, sex, and race cells. The SDR was calculated by dividing the observed number of donors by the expected number. The X2 tests of the hypothesis that the OPO's performance differed from the national norm of 1.0 were performed. The SDR was compared to the existing performance standard based on the unadjusted number of donors per million live population in the OPO's service area. An ordinary least squares (OLS) regression assessed predictors of the SDR. Principal Findings The SDRs ranged from 0.41 to 1.99. Twenty-nine of 64 OPOs had SDRs significantly different than 1.0. The SDRs were positively associated with the percent of white living population and the number of organ types transplanted per transplant center served by the OPO. Conclusions The SDRs can be used by Centers for Medicare and Medicaid Services (CMS), UNOS, and OPOs to target quality improvement initiatives, present more accurate comparisons of OPO performance, and develop public policy on the evaluation of the effectiveness of organ procurement efforts. PMID:12479499
Biogasification of Walt Disney World biomass waste blend. Annual report Jan-Dec 82
DOE Office of Scientific and Technical Information (OSTI.GOV)
Biljetina, R.; Chynoweth, D.P.; Janulis, J.
1983-05-01
The objective of this research is to develop efficient processes for conversion of biomass-waste blends to methane and other resources. To evaluate the technical and economic feasibility, an experimental test facility (ETU) is being designed and installed at the Reedy Creek Wastewater Treatment Plant at Walt Disney World, Orlando, Florida. The facility will integrate a biomethanogenic conversion process with a waste-water treatment process employing water hyacinth ponds for secondary and tertiary treatment of sewage produced at Walt Disney World. The ETU will be capable of feeding 1-wet ton per day of water hyacinth-sludge blends to the digestion system for productionmore » of methane and other byproducts. The detailed design of the facility has been completed and procurement of equipment is in progress.« less
FY94 CAG trip reports, CAG memos and other products: Volume 2. Final report
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1994-12-15
The Yucca Mountain Site Characterization Project (YMP) of the US DOE is tasked with designing, constructing, and operating an Exploratory Studies Facility (ESF) at Yucca Mountain, Nevada. The purpose of the YMP is to provide detailed characterization of the Yucca Mountain site for the potential mined geologic repository for permanent disposal of high-level radioactive waste. Detailed characterization of properties of the site are to be conducted through a wide variety of short-term and long-term in-situ tests. Testing methods require the installation of a large number of test instruments and sensors with a variety of functions. These instruments produce analog andmore » digital data that must be collected, processed, stored, and evaluated in an attempt to predict performance of the repository. The Integrated Data and Control System (IDCS) is envisioned as a distributed data acquisition that electronically acquires and stores data from these test instruments. IDCS designers are responsible for designing and overseeing the procurement of the system, IDCS Operation and Maintenance operates and maintains the installed system, and the IDCS Data Manager is responsible for distribution of IDCS data to participants. This report is a compilation of trip reports, interoffice memos, and other memos relevant to Computer Applications Group, Inc., work on this project.« less
Design of the ITER Electron Cyclotron Heating and Current Drive Waveguide Transmission Line
NASA Astrophysics Data System (ADS)
Bigelow, T. S.; Rasmussen, D. A.; Shapiro, M. A.; Sirigiri, J. R.; Temkin, R. J.; Grunloh, H.; Koliner, J.
2007-11-01
The ITER ECH transmission line system is designed to deliver the power, from twenty-four 1 MW 170 GHz gyrotrons and three 1 MW 127.5 GHz gyrotrons, to the equatorial and upper launchers. The performance requirements, initial design of components and layout between the gyrotrons and the launchers is underway. Similar 63.5 mm ID corrugated waveguide systems have been built and installed on several fusion experiments; however, none have operated at the high frequency and long-pulse required for ITER. Prototype components are being tested at low power to estimate ohmic and mode conversion losses. In order to develop and qualify the ITER components prior to procurement of the full set of 24 transmission lines, a 170 GHz high power test of a complete prototype transmission line is planned. Testing of the transmission line at 1-2 MW can be performed with a modest power (˜0.5 MW) tube with a low loss (10-20%) resonant ring configuration. A 140 GHz long pulse, 400 kW gyrotron will be used in the initial tests and a 170 GHz gyrotron will be used when it becomes available. Oak Ridge National Laboratory, managed by UT-Battelle, LLC, for the U.S. Dept. of Energy under contract DE-AC05-00OR22725.
Technical and Economic Aspects of Designing an Efficient Room Air-Conditioner Program in India
DOE Office of Scientific and Technical Information (OSTI.GOV)
Abhyankar, Nikit; Shah, Nihar; Phadke, Amol
Several studies have projected a massive increase in the demand for air conditioners (ACs) over the next two decades in India. By 2030, room ACs could add 140 GW to the peak load, equivalent to over 30% of the total projected peak load. Therefore, there is significant interest among policymakers, regulators, and utilities in managing room AC demand by enhancing energy efficiency. Building on the historical success of the Indian Bureau of Energy Efficiency’s star-labeling program, Energy Efficiency Services Limited recently announced a program to accelerate the sale of efficient room ACs using bulk procurement, similar to their successful UJALAmore » light-emitting diode (LED) bulk procurement program. This report discusses some of the key considerations in designing a bulk procurement or financial incentive program for enhancing room AC efficiency in India. We draw upon our previous research to demonstrate the overall technical potential and price impact of room AC efficiency improvement and its technical feasibility in India. We also discuss the importance of using low global warming potential (GWP) refrigerants and smart AC equipment that is demand response (DR) ready.« less
NASA Astrophysics Data System (ADS)
Launch vehicle propulsion system reliability considerations during the design and verification processes are discussed. The tools available for predicting and minimizing anomalies or failure modes are described and objectives for validating advanced launch system propulsion reliability are listed. Methods for ensuring vehicle/propulsion system interface reliability are examined and improvements in the propulsion system development process are suggested to improve reliability in launch operations. Also, possible approaches to streamline the specification and procurement process are given. It is suggested that government and industry should define reliability program requirements and manage production and operations activities in a manner that provides control over reliability drivers. Also, it is recommended that sufficient funds should be invested in design, development, test, and evaluation processes to ensure that reliability is not inappropriately subordinated to other management considerations.
The Application of Quantity Discounts in Army Procurements (Field Test).
1980-04-01
Work Directive (PWD). d. The amended PWD is forwarded to the Procurement and Production (PP) control where quantity increments and delivery schedules are...counts on 97 Army Stock Fund small purchases (less than $10,000) and received 10 I be * 0p cebe * )~ Cb 111 cost effective discounts on 46 or 47.4% of...discount but the computed annualized cost for the QD increment was larger than the computed annualized cost for the EOQ, this was not a cost effective
7 CFR 3201.80 - Electronic components cleaners.
Code of Federal Regulations, 2013 CFR
2013-01-01
... PROCUREMENT Designated Items § 3201.80 Electronic components cleaners. (a) Definition. Products that are designed to wash or remove dirt or extraneous matter from electronic parts, devices, circuits, or systems... 7 Agriculture 15 2013-01-01 2013-01-01 false Electronic components cleaners. 3201.80 Section 3201...
7 CFR 3201.80 - Electronic components cleaners.
Code of Federal Regulations, 2014 CFR
2014-01-01
... PROCUREMENT Designated Items § 3201.80 Electronic components cleaners. (a) Definition. Products that are designed to wash or remove dirt or extraneous matter from electronic parts, devices, circuits, or systems... 7 Agriculture 15 2014-01-01 2014-01-01 false Electronic components cleaners. 3201.80 Section 3201...
7 CFR 3201.68 - Erosion control materials.
Code of Federal Regulations, 2014 CFR
2014-01-01
... MANAGEMENT, DEPARTMENT OF AGRICULTURE GUIDELINES FOR DESIGNATING BIOBASED PRODUCTS FOR FEDERAL PROCUREMENT... manufactured for use on construction, demolition, or other sites to prevent wind or water erosion of loose...
7 CFR 3201.68 - Erosion control materials.
Code of Federal Regulations, 2013 CFR
2013-01-01
... MANAGEMENT, DEPARTMENT OF AGRICULTURE GUIDELINES FOR DESIGNATING BIOBASED PRODUCTS FOR FEDERAL PROCUREMENT... manufactured for use on construction, demolition, or other sites to prevent wind or water erosion of loose...
7 CFR 3201.68 - Erosion control materials.
Code of Federal Regulations, 2012 CFR
2012-01-01
... MANAGEMENT, DEPARTMENT OF AGRICULTURE GUIDELINES FOR DESIGNATING BIOBASED PRODUCTS FOR FEDERAL PROCUREMENT... manufactured for use on construction, demolition, or other sites to prevent wind or water erosion of loose...
Jacobson, Sheldon H; Sewell, Edward C; Allwine, Daniel A; Medina, Enrique A; Weniger, Bruce G
2003-02-01
The National Immunization Program, housed within the Centers for Disease Control and Prevention in the USA, has identified several challenges that must be faced in childhood immunization programs to deliver and procure vaccines that immunize children from the plethora of childhood diseases. The biomedical issues cited include how drug manufacturers can combine and formulate vaccines, how such vaccines are scheduled and administered and how economically sound vaccine procurement can be achieved. This review discusses how operations research models can be used to address the economics of pediatric vaccine formulary design and pricing, as well as how such models can be used to address a new set of pediatric formulary problems that will surface with the introduction of pediatric combination vaccines into the US pediatric immunization market.
Management and Capability ot the Major Range and Test Facility Bases
1995-07-27
The audit objective was to evaluate management oversight provided to the test ranges and determine whether management oversight could be streamlined... The audit also evaluated whether program managers were procuring test resources that already existed at the test ranges. Management controls related to the objectives were also evaluated.
NASA Technical Reports Server (NTRS)
1985-01-01
Task 2 in the Space Station Data System (SSDS) Analysis/Architecture Study is the development of an information base that will support the conduct of trade studies and provide sufficient data to make design/programmatic decisions. This volume identifies the preferred options in the programmatic category and characterizes these options with respect to performance attributes, constraints, costs, and risks. The programmatic category includes methods used to administrate/manage the development, operation and maintenance of the SSDS. The specific areas discussed include standardization/commonality; systems management; and systems development, including hardware procurement, software development and system integration, test and verification.
Routine recovery: an ethical plan for greatly increasing the supply of transplantable organs.
Spital, Aaron; Taylor, James S
2008-04-01
All current organ procurement policies require some form of consent. Many families refuse to permit organ recovery from a recently deceased relative; therefore, the major cost of requiring consent is the loss of some lives that could have been saved through transplantation. Here, we argue for a much more efficient approach to organ procurement from brain dead individuals - routine recovery of all transplantable organs without consent. Careful analysis of the relevant literature shows that, compared with its competitors, routine recovery has the greatest potential to increase cadaveric organ procurement and save lives while causing very little harm. Furthermore, a recent survey suggests that 30% of the US public would already accept routine recovery even though the respondents were not educated regarding the value of this approach. Patients on the transplant waiting list are dying while organs that could have saved them are being buried or burned because of family refusal to allow posthumous organ procurement. Routine recovery would eliminate this tragic loss of life-saving organs without violating ethical principles. Indeed, we argue that of all the proposals designed to increase the supply of transplantable cadaveric organs, routine recovery is the best.
NASA Technical Reports Server (NTRS)
Perry, Jimmy L.
1992-01-01
The same kind of standard and controls are established that are currently in use for the procurement of new analog, digital, and IBM/IBM compatible 3480 tape cartridges, and 1 in wide channel video magnetic tapes. The Magnetic Tape Certification Facility (MTCF) maintains a Qualified Products List (QPL) for the procurement of new magnetic media and uses the following specifications for the QPL and Acceptance Tests: (1) NASA TM-79724 is used for the QPL and Acceptance Testing of new analog magnetic tapes; (2) NASA TM-80599 is used for the QPL and Acceptance Testing of new digital magnetic tapes; (3) NASA TM-100702 is used for the QPL and Acceptance Testing of new IBM/IBM compatible 3840 magnetic tape cartridges; and (4) NASA TM-100712 is used for the QPL and Acceptance Testing of new 1 in wide channel video magnetic tapes. This document will be used for the QPL and Acceptance Testing of new Helical Scan 8 mm digital data tape cartridges.
Walsh, A P H; Omar, A B; Collins, G S; Murray, G U; Walsh, D J; Salma, U; Sills, E Scott
2010-01-01
Anonymous oocyte donation in the EU proceeds only after rigorous screening designed to ensure gamete safety. If anonymous donor gametes originating from outside EU territory are used by EU patients, donor testing must conform to the same standards as if gamete procurement had occurred in the EU. In Ireland, IVF recipients can be matched to anonymous donors in the Ukraine (a non-EU country). This investigation describes the evolution of anonymous oocyte donor screening methods during this period and associated results. Data were reviewed for all participants in an anonymous donor oocyte IVF programme from 2006 to 2009, when testing consistent with contemporary EU screening requirements was performed on all Ukrainian oocyte donors. HIV and hepatitis tests were aggregated from 314 anonymous oocyte donors and 265 recipients. The results included 5,524 Ukrainian women who were interviewed and 314 of these entered the programme (5.7% accession rate). Mean age of anonymous oocyte donors was 27.9 years; all had achieved at least one delivery. No case of hepatitis or HIV was detected at initial screening or at oocyte procurement. This is the first study of HIV and hepatitis incidence specifically among Ukrainian oocyte donors. We find anonymous oocyte donors to be a low-risk group, despite a high background HIV rate. Following full disclosure of the donation process, most Ukrainian women wishing to volunteer as anonymous oocyte donors do not participate. Current EU screening requirements appear adequate to maintain patient safety in the context of anonymous donor oocyte IVF.
A Study of Ballast Water Treatment Using Engine Waste Heat
NASA Astrophysics Data System (ADS)
Balaji, Rajoo; Yaakob, Omar; Koh, Kho King; Adnan, Faizul Amri bin; Ismail, Nasrudin bin; Ahmad, Badruzzaman bin; Ismail, Mohd Arif bin
2018-05-01
Heat treatment of ballast water using engine waste heat can be an advantageous option complementing any proven technology. A treatment system was envisaged based on the ballast system of an existing, operational crude carrier. It was found that the available waste heat could raise the temperatures by 25 °C and voyage time requirements were found to be considerable between 7 and 12 days to heat the high volumes of ballast water. Further, a heat recovery of 14-33% of input energies from exhaust gases was recorded while using a test rig arrangement representing a shipboard arrangement. With laboratory level tests at temperature ranges of around 55-75 °C, almost complete species mortalities for representative phytoplankton, zooplankton and bacteria were observed while the time for exposure varied from 15 to 60 s. Based on the heat availability analyses for harvesting heat from the engine exhaust gases(vessel and test rig), heat exchanger designs were developed and optimized using Lagrangian method applying Bell-Delaware approaches. Heat exchanger designs were developed to suit test rig engines also. Based on these designs, heat exchanger and other equipment were procured and erected. The species' mortalities were tested in this mini-scale arrangement resembling the shipboard arrangement. The mortalities realized were > 95% with heat from jacket fresh water and exhaust gases alone. The viability of the system was thus validated.
NASA Astrophysics Data System (ADS)
Van Dyke, Melissa; Martin, James
2005-02-01
The NASA Marshall Space Flight Center's Early Flight Fission Test Facility (EFF-TF), provides a facility to experimentally evaluate nuclear reactor related thermal hydraulic issues through the use of non-nuclear testing. This facility provides a cost effective method to evaluate concepts/designs and support mitigation of developmental risk. Electrical resistance thermal simulators can be used to closely mimic the heat deposition of the fission process, providing axial and radial profiles. A number of experimental and design programs were underway in 2004 which include the following. Initial evaluation of the Department of Energy Los Alamos National Laboratory 19 module stainless steel/sodium heat pipe reactor with integral gas heat exchanger was operated at up to 17.5 kW of input power at core temperatures of 1000 K. A stainless steel sodium heat pipe module was placed through repeated freeze/thaw cyclic testing accumulating over 200 restarts to a temperature of 1000 K. Additionally, the design of a 37- pin stainless steel pumped sodium/potassium (NaK) loop was finalized and components procured. Ongoing testing at the EFF-TF is geared towards facilitating both research and development necessary to support future decisions regarding potential use of space nuclear systems for space exploration. All efforts are coordinated with DOE laboratories, industry, universities, and other NASA centers. This paper describes some of the 2004 efforts.
NASA Technical Reports Server (NTRS)
VanDyke, Melissa; Martin, James
2005-01-01
The EFF-TF provides a facility to experimentally evaluate thermal hydraulic issues through the use of highly effective non-nuclear testing. These techniques provide a rapid, more cost effective method of evaluating designs and support development risk mitigation when concerns are associated with non-nuclear aspects of space nuclear systems. For many systems, electrical resistance thermal simulators can be used to closely mimic the heat deposition of the fission process, providing axial and radial profiles. A number of experimental and design programs were underway in 2004. Initial evaluation of the SAFE-100a (19 module stainless steel/sodium heat pipe reactor with integral gas neat exchanger) was performed with tests up to 17.5 kW of input power at core temperatures of 1000 K. A stainless steel sodium SAFE-100 heat pipe module was placed through repeated freeze/thaw cyclic testing accumulating over 200 restarts to a temperature of 1000 K. Additionally, the design of a 37-fuel pin stainless steel pumped sodium/potassium (NaK) loop was finalized and components procured. Ongoing testing at the EFF-TF is geared towards facilitating both research and development necessary to field a near term space nuclear system. Efforts are coordinated with DOE laboratories, industry, universities, and other NASA centers. This paper describes some of the 2004 efforts.
7 CFR 2902.36 - Concrete and asphalt release fluids.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 7 Agriculture 15 2010-01-01 2010-01-01 false Concrete and asphalt release fluids. 2902.36 Section... PROCUREMENT Designated Items § 2902.36 Concrete and asphalt release fluids. (a) Definition. Products that are designed to provide a lubricating barrier between the composite surface materials (e.g., concrete or...
7 CFR 2902.48 - General purpose household cleaners.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 7 Agriculture 15 2011-01-01 2011-01-01 false General purpose household cleaners. 2902.48 Section 2902.48 Agriculture Regulations of the Department of Agriculture (Continued) OFFICE OF ENERGY POLICY AND NEW USES, DEPARTMENT OF AGRICULTURE GUIDELINES FOR DESIGNATING BIOBASED PRODUCTS FOR FEDERAL PROCUREMENT Designated Items § 2902.48 General...
7 CFR 2902.40 - Laundry products.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 7 Agriculture 15 2011-01-01 2011-01-01 false Laundry products. 2902.40 Section 2902.40 Agriculture Regulations of the Department of Agriculture (Continued) OFFICE OF ENERGY POLICY AND NEW USES, DEPARTMENT OF AGRICULTURE GUIDELINES FOR DESIGNATING BIOBASED PRODUCTS FOR FEDERAL PROCUREMENT Designated Items § 2902.40 Laundry products. (a)...
7 CFR 3201.59 - Topical pain relief products.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 7 Agriculture 15 2014-01-01 2014-01-01 false Topical pain relief products. 3201.59 Section 3201.59... MANAGEMENT, DEPARTMENT OF AGRICULTURE GUIDELINES FOR DESIGNATING BIOBASED PRODUCTS FOR FEDERAL PROCUREMENT Designated Items § 3201.59 Topical pain relief products. (a) Definition. Products that can be balms, creams...
7 CFR 3201.59 - Topical pain relief products.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 7 Agriculture 15 2012-01-01 2012-01-01 false Topical pain relief products. 3201.59 Section 3201.59... MANAGEMENT, DEPARTMENT OF AGRICULTURE GUIDELINES FOR DESIGNATING BIOBASED PRODUCTS FOR FEDERAL PROCUREMENT Designated Items § 3201.59 Topical pain relief products. (a) Definition. Products that can be balms, creams...
7 CFR 3201.59 - Topical pain relief products.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 7 Agriculture 15 2013-01-01 2013-01-01 false Topical pain relief products. 3201.59 Section 3201.59... MANAGEMENT, DEPARTMENT OF AGRICULTURE GUIDELINES FOR DESIGNATING BIOBASED PRODUCTS FOR FEDERAL PROCUREMENT Designated Items § 3201.59 Topical pain relief products. (a) Definition. Products that can be balms, creams...
7 CFR 3201.64 - Compost activators and accelerators.
Code of Federal Regulations, 2014 CFR
2014-01-01
... PROCUREMENT Designated Items § 3201.64 Compost activators and accelerators. (a) Definition. Products in liquid or powder form designed to be applied to compost piles to aid in speeding up the composting process... 7 Agriculture 15 2014-01-01 2014-01-01 false Compost activators and accelerators. 3201.64 Section...
7 CFR 3201.64 - Compost activators and accelerators.
Code of Federal Regulations, 2013 CFR
2013-01-01
... PROCUREMENT Designated Items § 3201.64 Compost activators and accelerators. (a) Definition. Products in liquid or powder form designed to be applied to compost piles to aid in speeding up the composting process... 7 Agriculture 15 2013-01-01 2013-01-01 false Compost activators and accelerators. 3201.64 Section...
7 CFR 3201.64 - Compost activators and accelerators.
Code of Federal Regulations, 2012 CFR
2012-01-01
... PROCUREMENT Designated Items § 3201.64 Compost activators and accelerators. (a) Definition. Products in liquid or powder form designed to be applied to compost piles to aid in speeding up the composting process... 7 Agriculture 15 2012-01-01 2012-01-01 false Compost activators and accelerators. 3201.64 Section...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-05-17
... CFR Parts 1724 and 1726 RIN 0572-AC20 Electric Engineering, Architectural Services, Design Policies... standard forms of contracts promulgated by RUS for construction, procurement, engineering services and... XVII of title 7 of the Code of Federal Regulations as follows: PART 1724--ELECTRIC ENGINEERING...
7 CFR 2902.17 - Plastic insulating foam for residential and commercial construction.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 7 Agriculture 15 2010-01-01 2010-01-01 false Plastic insulating foam for residential and... BIOBASED PRODUCTS FOR FEDERAL PROCUREMENT Designated Items § 2902.17 Plastic insulating foam for residential and commercial construction. (a) Definition. Spray-in-place plastic foam products designed to...
EDS V25 containment vessel explosive qualification test report.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Rudolphi, John Joseph
2012-04-01
The V25 containment vessel was procured by the Project Manager, Non-Stockpile Chemical Materiel (PMNSCM) as a replacement vessel for use on the P2 Explosive Destruction Systems. It is the first EDS vessel to be fabricated under Code Case 2564 of the ASME Boiler and Pressure Vessel Code, which provides rules for the design of impulsively loaded vessels. The explosive rating for the vessel based on the Code Case is nine (9) pounds TNT-equivalent for up to 637 detonations. This limit is an increase from the 4.8 pounds TNT-equivalency rating for previous vessels. This report describes the explosive qualification tests thatmore » were performed in the vessel as part of the process for qualifying the vessel for explosive use. The tests consisted of a 11.25 pound TNT equivalent bare charge detonation followed by a 9 pound TNT equivalent detonation.« less
1981-03-12
Procurement Work Directive ( PWV ) Procurement Army, CostL to Procure Cost Differential Secondary (PAS) Cost to Buy Economic Order Quantity Procurement...and Assignment of Buyer h. Solicitation Fffort . ) (1) Procurement Planning ( ) ( ) (?) PWV Review and Small Business Coordination ( (3) Determination
NASA Technical Reports Server (NTRS)
Hawthorne, E. I.
1977-01-01
Several thrust system design concepts were evaluated and compared using the specifications of the most advanced 30 cm engineering model thruster as the technology base. Emphasis was placed on relatively high power missions. The extensions in thruster performance required for the Halley's comet mission were defined and alternative thrust system concepts were designed in sufficient detail for comparing mass, efficiency, reliability, structure, and thermal characteristics. Confirmation testing and analysis of thruster and power-processing components were performed. A baseline design was selected from the alternatives considered, and the design analysis and documentation were refined. A program development plan was formulated that outlines the work structure considered necessary for developing, qualifying, and fabricating the flight hardware for the baseline thrust system within the time frame of a project to rendezvous with Halley's comet. An assessment was made of the costs and risks associated with a baseline thrust system as provided to the mission project under this plan. Critical procurements and interfaces were identified and defined.
Extended performance solar electric propulsion thrust system study. Volume 1: Executive summary
NASA Technical Reports Server (NTRS)
Poeschel, R. L.; Hawthorne, E. I.
1977-01-01
Several thrust system design concepts were evaluated and compared using the specifications of the most advanced 30 cm engineering model thruster as the technology base. The extensions in thruster performance required for the Halley's comet mission were defined and alternative thrust system concepts were designed. Confirmation testing and analysis of thruster and power-processing components were performed, and the feasibility of satisfying extended performance requirements was verified. A baseline design was selected from the alternatives considered, and the design analysis and documentation were refined. A program development plan was formulated that outlines the work structure considered necessary for developing, qualifying, and fabricating the flight hardware for the baseline thrust system within the time frame of a project to rendezvous with Halley's comet. An assessment was made of the costs and risks associated with a baseline thrust system as provided to the mission project under this plan. Critical procurements and interfaces were identified and defined. Results are presented.
241-AZ-101 Waste Tank Color Video Camera System Shop Acceptance Test Report
DOE Office of Scientific and Technical Information (OSTI.GOV)
WERRY, S.M.
2000-03-23
This report includes shop acceptance test results. The test was performed prior to installation at tank AZ-101. Both the camera system and camera purge system were originally sought and procured as a part of initial waste retrieval project W-151.
Siminoff, Laura A; Traino, Heather M
2009-06-01
Deficiencies in the donation process continue to contribute to the shortage of organs available for transplant. Continuous quality improvement of hospitals' donation processes is needed to identify and correct the problems. To test the Rapid Assessment of Hospital Procurement Barriers in Donation (RAPiD), a direct observation technique with a focused ethnographic strategy, for assessing hospitals' donation processes and identifying areas in need of continuous quality improvement interventions. A pre-post assessment of hospitals' barriers to patient identification and referral, and family consent to donation. Seventeen hospitals within the catchment area of a Northeastern organ procurement organization were assessed by using the RAPiD method. Hospital administrators, health care providers, and staff (N = 537) were interviewed as part of the assessments. Interventions, including on-site training and education, and the use of in-house coordinators, were specifically tailored to each hospital's unique set of barriers to donation. The interventions were delivered to the hospitals in the form of recommendations. The participating organ procurement organization was responsible for implementation of the interventions. The RAPiD hospital evaluations revealed gaps in respondents' knowledge of organ donation, brain death, and referral criteria; a reluctance to declare brain death; and a rocky relationship between the hospitals and the organ procurement organization. As a result of the interventions, 9 hospitals' environments for organ donation improved, 7 showed no change, and 1 was worse.
1982-06-01
4 Research Design ........... ...................... 6 References ............ ......................... 6 2 VEGETATIONAL...deer herds and, concomitantly, to a procurement 0 system designed to exploit these animals. Thf- was also increased use of aquatic resources, although...34...o ’ design , and attempt to further define those cultural processes through wh ich scit ties articiflate wi th
The TPS Advanced Development Project for CEV
NASA Technical Reports Server (NTRS)
Reuther, James; Wercinski, Paul; Venkatapathy, Ethiraj; Ellerby, Don; Raiche, George; Bowman, Lynn; Jones, Craig; Kowal, John
2006-01-01
The CEV TPS Advanced Development Project (ADP) is a NASA in-house activity for providing two heatshield preliminary designs (a Lunar direct return as well as a LEO only return) for the CEV, including the TPS, the carrier structure, the interfaces and the attachments. The project s primary objective is the development of a single heatshield preliminary design that meets both Lunar direct return and LEO return requirements. The effort to develop the Lunar direct return capable heatshield is considered a high risk item for the NASA CEV development effort due to the low TRL (approx. 4) of the candidate TPS materials. By initiating the TPS ADP early in the development cycle, the intent is to use materials analysis and testing in combination with manufacturing demonstrations to reduce the programmatic risk of using advanced TPS technologies in the critical path for CEV. Due to the technical and schedule risks associated a Lunar return heatshield, the ADP will pursue a parallel path design approach, whereby a back-up TPS/heatshield design that only meets LEO return requirements is also developed. The TPS materials and carrier structure design concept selections will be based on testing, analysis, design and evaluation of scalability and manufacturing performed under the ADP. At the TPS PDR, the preferred programmatic strategy is to transfer the continued (detailed) design, development, testing and evaluation (DDT&E) of both the Lunar direct and LEO return designs to a government/prime contractor coordinated sub-system design team. The CEV prime contractor would have responsibility for the continued heatshield sub-system development. Continued government participation would include analysis, testing and evaluation as well as decision authority at TPS Final System Decision (FSD) (choosing between the primary and back-up heatshields) occurring between TPS PDR and TPS Critical Design Review (CDR). After TPS FSD the prime CEV contractor will complete the detailed design, certification testing, procurement, and integration of the CEV TPS.
The impact of HTA and procurement practices on the selection and prices of medical devices.
Callea, Giuditta; Armeni, Patrizio; Marsilio, Marta; Jommi, Claudio; Tarricone, Rosanna
2017-02-01
Technological innovation in healthcare yields better health outcomes but also drives healthcare expenditure, and governments are struggling to maintain an appropriate balance between patient access to modern care and the economic sustainability of healthcare systems. Health Technology Assessment (HTA) and centralized procurement are increasingly used to govern the introduction and diffusion of new technologies in an effort to make access to innovation financially sustainable. However, little empirical evidence is available to determine how they affect the selection of new technologies and unit prices. This paper focuses on medical devices (MDs) and investigates the combined effect of various HTA governance models and procurement practices on the two steps of the MD purchasing process (i.e., selecting the product and setting the unit price). Our analyses are based on primary data collected through a national survey of Italian public hospitals. The Italian National Health Service is an ideal case study because it is highly decentralized and because regions have adopted different HTA governance models (i.e., regional, hospital-based, double-level or no HTA), often in combination with centralized regional procurement programs. Hence, the Italian case allows us to test the impact of different combinations of HTA models and procurement programs in the various regions. The results show that regional HTA increases the probability of purchasing the costliest devices, whereas hospital-based HTA functions more like a cost-containment unit. Centralized regional procurement does not significantly affect MD selection and is associated with a reduction in the MD unit price: on average, hospitals located in regions with centralized procurement pay 10.1% less for the same product. Hospitals located in regions with active regional HTA programs pay higher prices for the same device (+23.2% for inexpensive products), whereas hospitals that have developed internal HTA programs pay 8.3% on average more for the same product. Copyright © 2016 The Authors. Published by Elsevier Ltd.. All rights reserved.
Biogasification of Walt Disney World biomass waste blend. Annual report, January-December 1983
DOE Office of Scientific and Technical Information (OSTI.GOV)
Biljetina, R.; Chynoweth, D.P.; Janulis, J.
1984-09-01
The objective of this research is to develop efficient processes for conversion of biomass-waste blends to methane and other resources. To evaluate the technical and economic feasibility, an experimental test unit (ETU) was designed and installed at the Reedy Creek Wastewater Treatment Plant at Walt Disney World in Lake Buena Vista, Florida. The facility integrates a biomethanogenic conversion process with a wastewater treatment process employing water hyacinth ponds for secondary and tertiary treatment of sewage. Harvested water hyacinth is subsequently combined with sludge from the primary wastewater clarifier and fed at 1-wet-ton per day to the ETU digester. This resultsmore » in the production of methane and other useful byproducts. Design, procurement of equipment, and installation has been completed. Start-up of the ETU is in progress.« less
Brassboard Astrometric Beam Combiner (ABC) Development for the Space Interferometry Mission (SIM)
NASA Technical Reports Server (NTRS)
Jeganathan, Muthu; Kuan, Gary; Rud, Mike; Lin, Sean; Sutherland, Kristen; Moore, James; An, Xin
2008-01-01
The Astrometric Beam Combiner (ABC) is a critical element of the Space Interferometry Mission (SIM) that performs three key functions: coherently combine starlight from two siderostats; individually detect starlight for angle tracking; and disperse and detect the interferometric fringes. In addition, the ABC contains: a stimulus, cornercubes and shutters for in-orbit calibration; several tip/tilt mirror mechanisms for in-orbit alignment; and internal metrology beam launcher for pathlength monitoring. The detailed design of the brassboard ABC (which has the form, fit and function of the flight unit) is complete, procurement of long-lead items is underway, and assembly and testing is expected to be completed in Spring 2009. In this paper, we present the key requirements for the ABC, details of the completed optical and mechanical design as well as plans for assembly and alignment.
The Fizeau Interferometer Testbed
NASA Technical Reports Server (NTRS)
Zhang, Xiaolei; Carpenter, Kenneth G.; Lyon, Richard G,; Huet, Hubert; Marzouk, Joe; Solyar, Gregory
2003-01-01
The Fizeau Interferometer Testbed (FIT) is a collaborative effort between NASA's Goddard Space Flight Center, the Naval Research Laboratory, Sigma Space Corporation, and the University of Maryland. The testbed will be used to explore the principles of and the requirements for the full, as well as the pathfinder, Stellar Imager mission concept. It has a long term goal of demonstrating closed-loop control of a sparse array of numerous articulated mirrors to keep optical beams in phase and optimize interferometric synthesis imaging. In this paper we present the optical and data acquisition system design of the testbed, and discuss the wavefront sensing and control algorithms to be used. Currently we have completed the initial design and hardware procurement for the FIT. The assembly and testing of the Testbed will be underway at Goddard's Instrument Development Lab in the coming months.
Green Power Partnership Basic Program Information
EPA's Green Power Partnership is a voluntary program designed to reduce the environmental impact of electricity generation by promoting renewable energy. Partners commit to procuring green power that meets EPA's requirements and receive recognition.
Green Power Partnership Top 10 Federal Government
The U.S. EPA's Green Power Partnership is a voluntary program designed to reduce the environmental impact of electricity generation by promoting renewable energy. This page highlights federal agency efforts in procuring green power.
Transferring new technologies within the federal sector: The New Technology Demonstration Program
DOE Office of Scientific and Technical Information (OSTI.GOV)
Conover, D.R.; Hunt, D.M.
1994-08-01
The federal sector is the largest consumer of products in the United States and annually purchases almost 1.5 quads of energy measured at the building site at a cost of almost $10 billion (U.S. Department of Energy 1991). A review of design, construction, and procurement practices in the federal sector, as well as discussions with manufacturers and vendors, indicated that new technologies are not utilized in as timely a manner as possible. As a consequence of this technology transfer lag, the federal sector loses valuable energy and environmental benefits that can be derived through the application of new technologies. Inmore » addition, opportunities are lost to reduce federal energy expenditures and spur U.S. economic growth through the procurement of such technologies. In 1990, under the direction of the U.S. Department of Energy (DOE) Federal Energy Management Program, the Pacific Northwest Laboratory began the design of a program to accelerate the introduction of new U.S. technologies into the federal sector. Designated first as the Test Bed Demonstration Program and more recently the New Technology Demonstration Program, it sought to shorten the acceptance period of new technologies within the federal sector. By installing and evaluating various new technologies at federal facilities, the Program attempts to increase the acceptance of those new technologies through the results of {open_quotes}real-world{close_quotes} federal installations. Since that time, the Program has conducted new technology demonstrations and evaluations, evolved to address the need for more timely information transfer, and explored collaborative opportunities with other DOE offices and laboratories. This paper explains the processes by which a new technology demonstration project is implemented and presents a general description of the Program results to date.« less
Aerospace Nickel-cadmium Cell Verification
NASA Technical Reports Server (NTRS)
Manzo, Michelle A.; Strawn, D. Michael; Hall, Stephen W.
2001-01-01
During the early years of satellites, NASA successfully flew "NASA-Standard" nickel-cadmium (Ni-Cd) cells manufactured by GE/Gates/SAFF on a variety of spacecraft. In 1992 a NASA Battery Review Board determined that the strategy of a NASA Standard Cell and Battery Specification and the accompanying NASA control of a standard manufacturing control document (MCD) for Ni-Cd cells and batteries was unwarranted. As a result of that determination, standards were abandoned and the use of cells other than the NASA Standard was required. In order to gain insight into the performance and characteristics of the various aerospace Ni-Cd products available, tasks were initiated within the NASA Aerospace Flight Battery Systems Program that involved the procurement and testing of representative aerospace Ni-Cd cell designs. A standard set of test conditions was established in order to provide similar information about the products from various vendors. The objective of this testing was to provide independent verification of representative commercial flight cells available in the marketplace today. This paper will provide a summary of the verification tests run on cells from various manufacturers: Sanyo 35 Ampere-hour (Ali) standard and 35 Ali advanced Ni-Cd cells, SAFr 50 Ah Ni-Cd cells and Eagle-Picher 21 Ali Magnum and 21 Ali Super Ni-CdTM cells from Eagle-Picher were put through a full evaluation. A limited number of 18 and 55 Ali cells from Acme Electric were also tested to provide an initial evaluation of the Acme aerospace cell designs. Additionally, 35 Ali aerospace design Ni-MH cells from Sanyo were evaluated under the standard conditions established for this program. Ile test program is essentially complete. The cell design parameters, the verification test plan and the details of the test result will be discussed.
Annual Procurement Report, Fiscal Year 1997
NASA Technical Reports Server (NTRS)
1997-01-01
This report presents summary data on all NASA procurement actions and detailed information on contracts, grants, agreements, and other procurements over $25,000 awarded by NASA during Fiscal Year 1997. The dollar value on procurements over $25,000 amounted to 98 percent of the total dollar value of procurement actions completed during Fiscal Year 1997. However, these larger procurements accounted for only 43 percent of the total actions. Procurement action, as used in this report means contractual actions to obtain supplies, services or construction which increase or decrease funds. A procurement action thus may be a new procurement or modifications such as supplemental agreements, change orders, or termination's to an existing contract that change the total amount of funds obligated. An obligation is a contractual commitment to pay for supplies or services that are specified in the contract. The Annual Procurement Report is also available via the internet on the Procurement homepage.
48 CFR 752.225-71 - Local procurement.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 48 Federal Acquisition Regulations System 5 2011-10-01 2011-10-01 false Local procurement. 752.225... Local procurement. For use in any USAID contract involving performance overseas. Local Procurement (FEB 1997) (a) Local procurement involves the use of appropriated funds to finance the procurement of goods...
48 CFR 752.225-71 - Local procurement.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Local procurement. 752.225... Local procurement. For use in any USAID contract involving performance overseas. Local Procurement (FEB 1997) (a) Local procurement involves the use of appropriated funds to finance the procurement of goods...
1983-01-01
for procurement of the first operational SRAM/ Altair /MV. (RDTE PE 64406F, 1 245JF) Space Suttle - Tne Space Shuttle is a NASA development program to...ACQUISITION IA.. R STUART IINCIASSIFIED JAN 83 RO.J- AC-64- FIG 5/ 1 NL IIIIIIIIIIIIIu IIIIIIIIIIIIIl IIIIIIIIIIIIIhl IIIhhhhmh ii1w 1112., 0 1111Ŗ--5, I i...MICROCOPY RESOLUTION TEST CHART NATIONAL BUREAU OF STANARS - 963 -A ’!/ 1 JA 12 5955 DEPARTMENT OF THE AIR FORCE JUSTIFICATION OF E&IMATES FOR FISCAL YEAR
Auctions vs negotiations: a study of price differentials.
Kjerstad, Egil
2005-12-01
Recent contributions in auction and bargaining theory suggest that a procurer should place more faith in the power of competition among alternative suppliers than in his or her own negotiating skill. Based on data from 216 contracts between procurers and suppliers of medical and surgical articles, we test whether auctions and bargaining result in significantly different prices. The main results are that auctions give 'thicker' markets compared with negotiations, as expected, but that auctions do not result in significantly lower prices compared with negotiations. Copyright (c) 2005 John Wiley & Sons, Ltd.
7 CFR 2902.34 - Carpet and upholstery cleaners.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 7 Agriculture 15 2011-01-01 2011-01-01 false Carpet and upholstery cleaners. 2902.34 Section 2902.34 Agriculture Regulations of the Department of Agriculture (Continued) OFFICE OF ENERGY POLICY AND NEW USES, DEPARTMENT OF AGRICULTURE GUIDELINES FOR DESIGNATING BIOBASED PRODUCTS FOR FEDERAL PROCUREMENT Designated Items § 2902.34 Carpet and...
10 CFR 435.304 - The COSTSAFR Program.
Code of Federal Regulations, 2011 CFR
2011-01-01
...) operates on a micro-computer system that uses the MS DOS operating system and is equipped with an 8087 co... (Version 3.0) also prints out a point system that identifies a wide array of different energy conservation... goal and the point system in the design and procurement procedures so that designers and builders can...
10 CFR 435.304 - The COSTSAFR Program.
Code of Federal Regulations, 2010 CFR
2010-01-01
...) operates on a micro-computer system that uses the MS DOS operating system and is equipped with an 8087 co... (Version 3.0) also prints out a point system that identifies a wide array of different energy conservation... goal and the point system in the design and procurement procedures so that designers and builders can...
10 CFR 435.304 - The COSTSAFR Program.
Code of Federal Regulations, 2014 CFR
2014-01-01
...) operates on a micro-computer system that uses the MS DOS operating system and is equipped with an 8087 co... (Version 3.0) also prints out a point system that identifies a wide array of different energy conservation... goal and the point system in the design and procurement procedures so that designers and builders can...
10 CFR 435.304 - The COSTSAFR Program.
Code of Federal Regulations, 2013 CFR
2013-01-01
...) operates on a micro-computer system that uses the MS DOS operating system and is equipped with an 8087 co... (Version 3.0) also prints out a point system that identifies a wide array of different energy conservation... goal and the point system in the design and procurement procedures so that designers and builders can...
10 CFR 435.304 - The COSTSAFR Program.
Code of Federal Regulations, 2012 CFR
2012-01-01
...) operates on a micro-computer system that uses the MS DOS operating system and is equipped with an 8087 co... (Version 3.0) also prints out a point system that identifies a wide array of different energy conservation... goal and the point system in the design and procurement procedures so that designers and builders can...
7 CFR 2902.26 - Lip care products.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 7 Agriculture 15 2011-01-01 2011-01-01 false Lip care products. 2902.26 Section 2902.26 Agriculture Regulations of the Department of Agriculture (Continued) OFFICE OF ENERGY POLICY AND NEW USES, DEPARTMENT OF AGRICULTURE GUIDELINES FOR DESIGNATING BIOBASED PRODUCTS FOR FEDERAL PROCUREMENT Designated Items § 2902.26 Lip care products. (a)...
Acceptance test report for portable exhauster POR-008/Skid F
DOE Office of Scientific and Technical Information (OSTI.GOV)
Kriskovich, J.R.
1998-07-24
Portable Exhauster POR-008 was procured via HNF-0490, Specification for a Portable Exhausted System for Waste Tank Ventilation. Prior to taking ownership, acceptance testing was performed at the vendors. However at the conclusion of testing a number of issues remained that required resolution before the exhausters could be used by Project W-320. The purpose of acceptance testing documented by this report was to demonstrate compliance of the exhausters with the performance criteria established within HNF-O49O, Rev. 1 following a repair and upgrade effort at Hanford. In addition, data obtained during this testing is required for the resolution of outstanding Non-conformance Reportsmore » (NCR), and finally, to demonstrate the functionality of the associated software for the pressure control and high vacuum exhauster operating modes provided for by W-320. Additional testing not required by the ATP was also performed to assist in the disposition and close out of receiving inspection report and for application design information (system curve). Results of this testing are also captured within this document.« less
DOT National Transportation Integrated Search
2013-02-27
SCDOT hires many consultants to provide professional services in support of its planning, design, construction and : maintenance projects. SCDOT personnel responsible for procuring and administering these professional service : contracts, especially ...
Next-Generation NATO Reference Mobility Model (NG-NRMM)
2016-05-11
facilitate comparisons between vehicle design candidates and to assess the mobility of existing vehicles under specific scenarios. Although NRMM has...of different deployed platforms in different areas of operation and routes Improved flexibility as a design and procurement support tool through...Element Method DEM Digital Elevation Model DIL Driver in the Loop DP Drawbar Pull Force DOE Design of Experiments DTED Digital Terrain Elevation Data
Computerized engineering logic for nuclear procurement and dedication processes
DOE Office of Scientific and Technical Information (OSTI.GOV)
Tulay, M.P.
1996-12-31
In an attempt to better meet the needs of operations and maintenance organizations, many nuclear utility procurement engineering groups have simplified their procedures, developed on-line tools for performing the specification of replacement items, and developed relational databases containing part-level information necessary to automate the procurement process. Although these improvements have helped to reduce the engineering necessary to properly specify and accept/dedicate items for nuclear safety-related applications, a number of utilities have recognized that additional long-term savings can be realized by integrating a computerized logic to assist technical procurement engineering personnel. The most commonly used logic follows the generic processes containedmore » in Electric Power Research Institute (EPRI) published guidelines. The processes are typically customized to some extent to accommodate each utility`s organizational structure, operating procedures, and strategic goals. This paper will discuss a typical logic that integrates the technical evaluation, acceptance, and receipt inspection and testing processes. The logic this paper will describe has been successfully integrated at a growing number of nuclear utilities and has produced numerous positive results. The application of the logic ensures that utility-wide standards or procedures, common among multi-site utilities, are followed.« less
Design of the Williams Field Services Mobile Bay ethane recovery plant
DOE Office of Scientific and Technical Information (OSTI.GOV)
Vogel, D.C.; McKenzie, D.
1999-07-01
ABB Randall designed, procured and constructed a two train expander plant with a base case design capacity of 525 MMscfd and a hydraulic design capacity of 600 MMscfd. Randall has used its Recycle Reflux Process, proven in other installations, resulting in a calculated ethane recovery of 93% at 525 MMscfd (78% at 600 MMscfd) and ethane rejection. Liquids production creates a design challenge due to the presence of acid gas components such as CO{sub 2}, H{sub 2}S, mercaptans and COS, with the latter three causing the product to fail the copper strip test. The challenge is to remove the componentsmore » to the required level with minimum cost and in an operator-friendly manner. The following combinations of processes were reviewed: DGA, MDEA and Merichem, COS Hydrolysis and MDEA, MDEA and KOH, Sulfinol, MDEA and SulfaClean; and MDEA and mol sieve. This paper will give a brief description, an illustration and economic impact information of each one. Lastly, the rationale behind the selection of the COS Hydrolysis bed, MDEA absorber and provisions to add an iron sponge bed is discussed.« less
NASA procurement report, FY 1992
NASA Technical Reports Server (NTRS)
1992-01-01
This report presents summary data on all NASA procurement actions and detailed information on contracts, grants, agreements, and other procurements over $25,000 awarded by NASA during the first six months of Fiscal Year 1992. The dollar value on procurements over $25,000 amounted to 98 percent of the total dollar value of procurement actions completed during the first six months of Fiscal Year 1992. However, these larger procurements accounted for only 29 percent of the total actions. Procurement action, as used in this report, means contractual actions to obtain supplies, services, or construction which increase or decrease funds. A procurement action thus may be a new procurement, or modifications such as supplementary agreements, change orders, or terminations to a contract that change the total amount of funds obligated.
Assurance of COTS Boards for Space Flight. Part 1
NASA Technical Reports Server (NTRS)
Plante, Jeannette; Helmold, Norm; Eveland, Clay
1998-01-01
Space Flight hardware and software designers are increasingly turning to Commercial-Off-the-Shelf (COTS) products in hopes of meeting the demands imposed on them by projects with short development cycle times. The Technology Validation Assurance (TVA) team at NASA GSFC has embarked on applying a method for inserting COTS hardware into the Spartan 251 spacecraft. This method includes Procurement, Characterization, Ruggedization/Remediation and Verification Testing process steps which are intended to increase the uses confidence in the hardware's ability to function in the intended application for the required duration. As this method is refined with use, it has the potential for becoming a benchmark for industry-wide use of COTS in high reliability systems.
Anker, Ashley E; Feeley, Thomas Hugh
2011-07-01
The present study provides an in-depth examination of the messages used by organ procurement coordinators (OPCs) in shaping familial requests for organ donation. OPCs (N = 102), recruited from a national sample of 16 organ procurement organizations, participated in a structured interview designed to uncover the communication strategies used in obtaining familial consent for donation. Analysis of interviews indicates OPCs' messages cover 4 domain areas. Specifically, OPCs report use of messages intended to (a) provide education, (b) discuss the benefits to donation, (c) learn about potential donor families, and (d) persuade families to engage in donation. Within the 4 domain areas, OPCs report use of 15 specific messages (e.g., "positively framing the donor," "social proof," "discuss the benefit of donation to grieving") in requesting consent. The present study provides a detailed examination of strategies and offers recommendations for using message strategies to explore the effectiveness of the consent process from the perspective of OPCs in approaching donor families.
Transformation of fraud activities in procurement system in Indonesia
NASA Astrophysics Data System (ADS)
Setiani, N.; Huda, S. N.; Pulungan, R.; Winarko, E.
2017-03-01
E-procurement has been applied in Indonesia since 2008 through the adoption of Electronic Procurement System (SPSE). The purpose of the use of SPSE in the procurement process is to improve the efficiency of goods or services procurement. In the bidding process, intensive communication and data exchange between providers and organizers are urgently needed. Through SPSE, the frequency of face to face meetings between providers and the committee can be reduced. This is expected to minimize potential fraud behaviors in the goods or services procurement conducted through the tender process. There exists a transformation of activities in the procurement through SPSE from the tender process that was previously done manually. In this paper, we analyze this transformation between manual procurement process and SPSE-based procurement process. The result of the analysis is exploited for investigating the possibility of fraud behavior transformations in every phase of e-procurement activities.
Sørensen, Nina N; Lassen, Anne D; Løje, Hanne; Tetens, Inge
2015-09-01
With political support from the Danish Organic Action Plan 2020, organic public procurement in Denmark is expected to increase. In order to evaluate changes in organic food procurement in Danish public kitchens, reliable methods are needed. The present study aimed to compare organic food procurement measurements by two methods and to collect and discuss baseline organic food procurement measurements from public kitchens participating in the Danish Organic Action Plan 2020. Comparison study measuring organic food procurement by applying two different methods, one based on the use of procurement invoices (the Organic Cuisine Label method) and the other on self-reported procurement (the Dogme method). Baseline organic food procurement status was based on organic food procurement measurements and background information from public kitchens. Public kitchens participating in the six organic food conversion projects funded by the Danish Organic Action Plan 2020 during 2012 and 2013. Twenty-six public kitchens (comparison study) and 345 public kitchens (baseline organic food procurement status). A high significant correlation coefficient was found between the two organic food procurement measurement methods (r=0·83, P<0·001) with measurements relevant for the baseline status. Mean baseline organic food procurement was found to be 24 % when including measurements from both methods. The results indicate that organic food procurement measurements by both methods were valid for the baseline status report of the Danish Organic Action Plan 2020. Baseline results in Danish public kitchens suggest there is room for more organic as well as sustainable public procurement in Denmark.
Microprocessor Seminar, phase 2
NASA Technical Reports Server (NTRS)
Scott, W. R.
1977-01-01
Workshop sessions and papers were devoted to various aspects of microprocessor and large scale integrated circuit technology. Presentations were made on advanced LSI developments for high reliability military and NASA applications. Microprocessor testing techniques were discussed, and test data were presented. High reliability procurement specifications were also discussed.
NASA Technical Reports Server (NTRS)
Free, James M.
1993-01-01
This paper assesses the feasibility of using eddy current nondestructive examination to determine flaw sizes in completely assembled hydrazine propellant tanks. The study was performed by the NASA Goddard Space Flight Center for the Tropical Rainfall Measuring Mission (TRMM) project to help determine whether existing propellant tanks could meet the fracture analysis requirements of the current pressure vessel specification, MIL-STD-1522A and, therefore be used on the TRMM spacecraft. After evaluating several nondestructive test methods, eddy current testing was selected as the most promising method for determining flaw sizes on external and internal surfaces of completely assembled tanks. Tests were conducted to confirm the detection capability of the eddy current NDE, procedures were developed to inspect two candidate tanks, and the test support equipment was designed. The non-spherical tank eddy current NDE test program was terminated when the decision was made to procure new tanks for the TRMM propulsion subsystem. The information on the development phase of this test program is presented in this paper as a reference for future investigation on the subject.
Energy and Environment Guide to Action - Chapter 7.1: Electricity Resource Planning and Procurement
Electricity resource planning includes power plants, electricity delivery, and end-use demand. Find more information on designing, implementing, and evaluating electricity resource planning policies. State success stories are included for reference.
Code of Federal Regulations, 2012 CFR
2012-01-01
... films. Films that are designed to resist water, ammonia, and other compounds, to be re-used, and to not... recommendations can be found on EPA's Web site http://www.epa.gov/epaoswer/non-hw/procure/products.htm and then...
Code of Federal Regulations, 2014 CFR
2014-01-01
... films. Films that are designed to resist water, ammonia, and other compounds, to be re-used, and to not... recommendations can be found on EPA's Web site http://www.epa.gov/epaoswer/non-hw/procure/products.htm and then...
Code of Federal Regulations, 2013 CFR
2013-01-01
... films. Films that are designed to resist water, ammonia, and other compounds, to be re-used, and to not... recommendations can be found on EPA's Web site http://www.epa.gov/epaoswer/non-hw/procure/products.htm and then...
NASA procurement report, FY 1993
NASA Technical Reports Server (NTRS)
1993-01-01
Summary data on all NASA procurement actions and detailed information on contracts, grants, agreements, and other procurements over $25,000 awarded by NASA during fiscal year 1993. The dollar value on procurements over $25,000 amounted to 97 percent of the total dollar value of procurement actions completed during fiscal year 1993. However, these larger procurements accounted for only 29 percent of the total actions. Procurement action, as used in this report, means contractural actions to obtain supplies, services, or construction which increase or decrease funds. A procurement action thus may be a new procurement, or modifications such as supplemental agreements, change orders, or terminations to an existing contract that change the total amount of funds obligated. An obligation is a contractual commitment to pay for supplies or services that are specified in the contract.
Teaching Auction Strategy Using Experiments Administered Via the Internet
ERIC Educational Resources Information Center
Asker, John; Grosskopf, Brit; McKinney, C. Nicholas; Niederle, Muriel; Roth, Alvin E.; Weizsacker, Georg
2004-01-01
The authors present an experimental design used to teach concepts in the economics of auctions and implications for e-Business procurement. The experiment is easily administered and can be adapted to many different treatments. The chief innovation is that it does not require the use of a lab or class time. Instead, the design can be implemented on…
A programmable heater control circuit for spacecraft
NASA Technical Reports Server (NTRS)
Nguyen, D. D.; Owen, J. W.; Smith, D. A.; Lewter, W. J.
1994-01-01
Spacecraft thermal control is accomplished for many components through use of multilayer insulation systems, electrical heaters, and radiator systems. The heaters are commanded to maintain component temperatures within design specifications. The programmable heater control circuit (PHCC) was designed to obtain an effective and efficient means of spacecraft thermal control. The hybrid circuit provides use of control instrumentation as temperature data, available to the spacecraft central data system, reprogramming capability of the local microprocessor during the spacecraft's mission, and the elimination of significant spacecraft wiring. The hybrid integrated circuit has a temperature sensing and conditioning circuit, a microprocessor, and a heater power and control circuit. The device is miniature and housed in a volume which allows physical integration with the component to be controlled. Applications might include alternate battery-powered logic-circuit configurations. A prototype unit with appropriate physical and functional interfaces was procured for testing. The physical functionality and the feasibility of fabrication of the hybrid integrated circuit were successfully verified. The remaining work to develop a flight-qualified device includes fabrication and testing of a Mil-certified part. An option for completing the PHCC flight qualification testing is to enter into a joint venture with industry.
DOE Office of Scientific and Technical Information (OSTI.GOV)
None, None
This report is concerned with the nature and scope of the technical services to be rendered and the general plan proposed for operation of Building 3525, High Radiation Level Examination Laboratory (HRLEL). The role of postirradiation examination in implementing the over- all task of irradiation testing for various programs under way at the Oak Ridge National Laboratory (ORNL) and the importance of this effort to the United Stat es reactor development program are stressed . The shielded-cell complex with provisions for remote decontamination, hot-equipment storage, and maintenance is described, as well as other supporting activities which are incorporated into themore » facility. The proposed technical functions include general observation, mensuration, nondestructive testing, burnup and induced-activity measurements, fission-gas sampling and analysis, corrosion evaluation and related measurements, disassembly and cutup, metallographic examination, mechanical-property determinations , and x -ray diffraction analyses. Equipment design and operational features to improve detection and measurement of selected properties in radioactive material s are described, also. The current status on design, procurement, construction, and preoperational testing of in- cell equipment in the mockup is presented along with a forecast of future needs. The mode of operation, manpower requirements, and management of the facility are discussed.« less
Anema, Aranka; Fielden, Sarah J.; Shurgold, Susan; Ding, Erin; Messina, Jennifer; Jones, Jennifer E.; Chittock, Brian; Monteith, Ken; Globerman, Jason; Rourke, Sean B.; Hogg, Robert S.
2016-01-01
Objective People living with HIV in high-resource settings suffer severe levels of food insecurity; however, limited evidence exists regarding dietary intake and sub-components that characterize food insecurity (i.e. food quantity, quality, safety or procurement) in this population. We examined the prevalence and characteristics of food insecurity among people living with HIV across British Columbia, Canada. Design This cross-sectional analysis was conducted within a national community-based research initiative. Methods Food security was measured using the Health Canada Household Food Security Scale Module. Logistic regression was used to determine key independent predictors of food insecurity, controlling for potential confounders. Results Of 262 participants, 192 (73%) reported food insecurity. Sub-components associated with food insecurity in bivariate analysis included: < RDI consumption of protein (p = 0.046); being sick from spoiled/unsafe food in the past six months (p = 0.010); and procurement of food using non-traditional methods (p <0.05). In multivariable analyses, factors significantly associated with food insecurity included: procurement of food using non-traditional methods [AOR = 11.11, 95% CI: 4.79–25.68, p = <0.001]; younger age [AOR = 0.92, 95% CI: 0.86–0.96, p = <0.001]; unstable housing [AOR = 4.46, 95% CI: 1.15–17.36, p = 0.031]; household gross annual income [AOR = 4.49, 95% CI: 1.74–11.60, p = 0.002]; and symptoms of depression [AOR = 2.73, 95% CI: 1.25–5.96, p = 0.012]. Conclusions Food insecurity among people living with HIV in British Columbia is characterized by poor dietary quality and food procurement methods. Notably, participants who reported procuring in non-traditional manners were over 10 times more likely to be food insecure. These findings suggest a need for tailored food security and social support interventions in this setting. PMID:27487041
Cryogenic fluid management experiment
NASA Technical Reports Server (NTRS)
Eberhardt, R. N.; Bailey, W. J.; Fester, D. A.
1981-01-01
The cryogenic fluid management experiment (CFME), designed to characterize subcritical liquid hydrogen storage and expulsion in the low-q space environment, is discussed. The experiment utilizes a fine mesh screen fluid management device to accomplish gas-free liquid expulsion and a thermodynamic vent system to intercept heat leak and control tank pressure. The experiment design evolved from a single flight prototype to provision for a multimission (up to 7) capability. A detailed design of the CFME, a dynamic test article, and dedicated ground support equipment were generated. All materials and parts were identified, and components were selected and specifications prepared. Long lead titanium pressurant spheres and the flight tape recorder and ground reproduce unit were procured. Experiment integration with the shuttle orbiter, Spacelab, and KSC ground operations was coordinated with the appropriate NASA centers, and experiment interfaces were defined. Phase 1 ground and flight safety reviews were conducted. Costs were estimated for fabrication and assembly of the CFME, which will become the storage and supply tank for a cryogenic fluid management facility to investigate fluid management in space.
Dual-Band Deramp Radar Design for Ocean Current Measurements
NASA Technical Reports Server (NTRS)
Haynes, Mark S.
2005-01-01
A mission has been proposed to remotely measure ocean surface currents and surface wind velocities. It will provide the highest resolution and repeat time of these measurements to date for ocean current models with scientific and societal applications. A ground-based experimental radar unit is needed for proof of concept. The proposed experiment set up is to mount the radar on an oil rig to imitate satellite data acquisition. This summer, I completed the radar design. The design employs chirp/deramp topology with simultaneous transmit/receive channels. These two properties allow large system bandwidth, extended sample time, close range imaging, and low sampling rate. The radar operates in the Ku and Ka microwave bands, at 13.5 and 35.5 GHz, respectively, with a system bandwidth of 300 MHz. I completed the radar frequency analysis and research on potential components and antenna configurations. Subsequent work is needed to procure components, as well as to build, test, and deploy the radar.
40 CFR 35.6565 - Procurement methods.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 40 Protection of Environment 1 2014-07-01 2014-07-01 false Procurement methods. 35.6565 Section 35... Actions Procurement Requirements Under A Cooperative Agreement § 35.6565 Procurement methods. The... purchase procedures are those relatively simple and informal procurement methods for securing services...
DOT National Transportation Integrated Search
2007-09-01
Traditional state procurement processes are not well-suited to the procurement of Intelligent Transportation Systems (ITS). The objective of this study was to analyze Kentuckys existing procurement processes, identify strengths and weaknesses of e...
40 CFR 35.6565 - Procurement methods.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 40 Protection of Environment 1 2012-07-01 2012-07-01 false Procurement methods. 35.6565 Section 35... Actions Procurement Requirements Under A Cooperative Agreement § 35.6565 Procurement methods. The... purchase procedures are those relatively simple and informal procurement methods for securing services...
40 CFR 35.6565 - Procurement methods.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 40 Protection of Environment 1 2013-07-01 2013-07-01 false Procurement methods. 35.6565 Section 35... Actions Procurement Requirements Under A Cooperative Agreement § 35.6565 Procurement methods. The... purchase procedures are those relatively simple and informal procurement methods for securing services...
40 CFR 35.6565 - Procurement methods.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 40 Protection of Environment 1 2011-07-01 2011-07-01 false Procurement methods. 35.6565 Section 35... Actions Procurement Requirements Under A Cooperative Agreement § 35.6565 Procurement methods. The... purchase procedures are those relatively simple and informal procurement methods for securing services...
40 CFR 35.6565 - Procurement methods.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Procurement methods. 35.6565 Section 35... Actions Procurement Requirements Under A Cooperative Agreement § 35.6565 Procurement methods. The... purchase procedures are those relatively simple and informal procurement methods for securing services...
22 CFR 201.23 - Procurement under private sector procedures.
Code of Federal Regulations, 2010 CFR
2010-04-01
... 22 Foreign Relations 1 2010-04-01 2010-04-01 false Procurement under private sector procedures... § 201.23 Procurement under private sector procedures. (a) General requirements. Procurements under private sector procedures will normally be carried out by importers using negotiated procurement...
An Analysis of Cost Premiums and Losses Associated with USAF Military Construction (MILCON)
2013-03-01
Corps of Engineers (USACE) or the Naval Facilities Engineering Command (NAVFAC) for design and construction of the annual military construction...AFCEC in lieu of AFCEE or AFCESA. The selection, and policies, of design and construction agents may cause cost premiums for Air Force MILCON...private industry best practices such as relational contracting, schedule performance, and design -build procurement methods. All of these research
Summary data on all NASA procurement actions
NASA Technical Reports Server (NTRS)
1992-01-01
This report presents summary data on all NASA procurement actions and detailed information on contracts, grants, agreements, and other procurements over $25,000 awarded by NASA during Fiscal Year 1992 (FY-92). The dollar value on procurements over $25,000 amounted to 97 percent of the total dollar value of procurement actions completed during FY-92. However, these larger procurements accounted for only 28 percent of the total actions. Procurement action, as used in this report, means contractual actions to obtain supplies, services, or construction which increase or decrease funds. A procurement action thus may be a new procurement or modifications such as supplemental agreements, change orders, or terminations to an existing contract that change the total amount of funds obligated. An obligation is a contractual commitment to pay for supplies or services that are specified in the contract.
Opto-mechanical support services. Final report
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
This subcontract was for Optomec`c support of the Los Alamos National Laboratory`s (LANL`s) Group MEE-12 in the technical specialty area of opto-mechanical design, engineering and fabrication. Two individual tasks were defined by MEE-12 and completed by Optomec personnel. Edward J. Yavornik acted as Principal Investigator on the Wire and Fluorescent Fiber Offset Grid (WAFFOG) for the Neutral Particle Beam (NPB) GTA (Ground Test Accelerator) Experiment, and Thomas Swann acted as Principal Investigator on the ESS-7 Photometers Project. Some hardware was procured/fabricated for the ESS-7 Photometer task, however, most of the work consisted of design and engineering support resulting in drawingsmore » and specifications which were prepared by MEE-12 personnel. There were no technical papers or patents generated by Optomec personnel as a result of this work, and all work defined in the contract was completed.« less
Advanced Turbo-Charging Research and Development
DOE Office of Scientific and Technical Information (OSTI.GOV)
None
2008-02-27
The objective of this project is to conduct analysis, design, procurement and test of a high pressure ratio, wide flow range, and high EGR system with two stages of turbocharging. The system needs to meet the stringent 2010MY emissions regulations at 20% + better fuel economy than its nearest gasoline competitor while allowing equivalent vehicle launch characteristics and higher torque capability than its nearest gasoline competitor. The system will also need to meet light truck/ SUV life requirements, which will require validation or development of components traditionally used only in passenger car applications. The conceived system is termed 'seriessequential turbocharger'more » because the turbocharger system operates in series at appropriate times and also sequentially when required. This is accomplished using intelligent design and control of flow passages and valves. Components of the seriessequential system will also be applicable to parallel-sequential systems which are also expected to be in use for future light truck/SUV applications.« less
Suit study - The impact of VMS in subsystem integration
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hill, B.; Watts, R.
1992-02-01
One of the thrusts of the Wright Laboratory/FIVE-sponsored Subsystem Integration Technology (SUIT) study is to investigate the impact of emerging vehicle management system (VMS) concepts on subsystem integration. This paper summarizes the issues relating to VMS/subsystem integration as examined during the Northrop SUIT study. Projected future weapon system requirements are identified and their impact on VMS and subsystem design interpreted. Integrated VMS/subsystem control and management functions are proposed. A candidate system VMS architecture satisfying the aforementioned weapon system requirements and providing the identified control and management functions is proposed. This architecture is used, together with the environmental control system, asmore » an illustrative subsystem example, to address the risks associated with the design, development, procurement, integration and testing of integrated VMS/subsystem concepts. The conclusion is that the development process requires an airframer to adopt the role of subsystem integrator, the consequences of which are discussed. 2 refs.« less
76 FR 53419 - Procurement List; Proposed Additions
Federal Register 2010, 2011, 2012, 2013, 2014
2011-08-26
...., Farmville, VA. Service Type/Location: Grounds Maintenance, Air Force Research Laboratory Stockbridge Test... Activity: Dept. of the Air Force, FA8751 AFRL RIKO, Rome, NY. Patricia Briscoe, Deputy Director, Business...
NASA Technical Reports Server (NTRS)
House, G.
1980-01-01
Methods are defined for implementing quality assurance policy and requirements for life sciences laboratory equipment, experimental hardware, integration and test support equipment, and integrated payloads.
75 FR 13262 - Procurement List Additions and Deletions
Federal Register 2010, 2011, 2012, 2013, 2014
2010-03-19
...: Additions to and deletions from the Procurement List. SUMMARY: This action adds to the Procurement List a... severe disabilities, and deletes from the Procurement List services previously furnished by such agencies... Severely Disabled published notices of proposed additions to the Procurement List. After consideration of...
75 FR 49481 - Procurement List; Additions and Deletion
Federal Register 2010, 2011, 2012, 2013, 2014
2010-08-13
... added to the Procurement List: Services Service Type/Locations: Laundry Service, Atlanta VA Medical...: Additions to and deletion from the Procurement List. SUMMARY: This action adds services to the Procurement... disabilities and deletes a service from the Procurement List previously furnished by such agency. DATES...
Public perspectives on biospecimen procurement: what biorepositories should consider.
L'Heureux, Jamie; Murray, Jeffrey C; Newbury, Elizabeth; Shinkunas, Laura; Simon, Christian M
2013-06-01
Human biospecimens are central to biobanking efforts, yet how members of the public think about biobank procurement strategies is not well understood. This study aimed to explore public perspectives toward the procurement of residual clinical material versus "direct" procurement strategies such as the drawing of blood. Members of the public residing in and beyond the biobank catchment area of the University of Iowa Hospitals and Clinics were randomly selected to participate in focus groups and a telephone survey. The majority of survey participants (75%, n=559) found both residual and direct procurement strategies equally workable. Small proportions preferred either residual (15%; n=117) or direct (5%; n=40) procurement. Focus group participants (n=48) could identify benefits to both procurement strategies, but raised concerns about possible donor inconvenience/discomfort and reduced biospecimen accrual in the case of direct procurement. Residual procurement raised concerns about lower-quality samples being procured without full donor awareness. Biobanks should consider that members of the public in their research programs may be willing to make specimen donations regardless of whether a residual or direct procurement strategy is employed. Limiting patient discomfort and inconvenience may make direct procurement strategies more acceptable to some members of the public. Ensuring donor awareness through effective informed consent may allay public concerns about the indirectness of donating clinical biospecimens.
Technical specification for vacuum systems
DOE Office of Scientific and Technical Information (OSTI.GOV)
Khaw, J.
The vacuum systems at the Stanford Linear Accelerator Center (SLAC) are primarily of all-metal construction and operate at pressures from 10/sup -5/ to 10/sup -11/ Torr. The primary gas loads during operation result from thermal desorption and beam-induced desorption from the vacuum chamber walls. These desorption rates can be extremely high in the case of hydrocarbons and other contaminants. These specifications place a major emphasis on eliminating contamination sources. The specifications and procedures have been written to insure the cleanliness and vacuum integrity of all SLAC vacuum systems, and to assist personnel involved with SLAC vacuum systems in choosing andmore » designing components that are compatible with existing systems and meet the quality and reliability of SLAC vacuum standards. The specification includes requirements on design, procurement, fabrication, chemical cleaning, clean room practices, welding and brazing, helium leak testing, residual gas analyzer testing, bakeout, venting, and pumpdown. Also appended are specifications regarding acceptable vendors, isopropyl alcohol, bakeable valve cleaning procedure, mechanical engineering safety inspection, notes on synchrotron radiation, and specifications of numerous individual components. (LEW)« less
77 FR 11071 - Procurement List; Additions and Deletions
Federal Register 2010, 2011, 2012, 2013, 2014
2012-02-24
...: Additions to and Deletions from the Procurement List. SUMMARY: This action adds services to the Procurement... disabilities, and deletes products and services from the Procurement List previously furnished by such agencies... People Who Are Blind or Severely Disabled published notices of proposed additions to the Procurement List...
14 CFR 1201.400 - NASA procurement program.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 14 Aeronautics and Space 5 2012-01-01 2012-01-01 false NASA procurement program. 1201.400 Section... AND GENERAL INFORMATION General Information § 1201.400 NASA procurement program. (a) The Office of... contact for NASA procurements. Although the procurements may be made by the field installations, selected...
14 CFR 1201.400 - NASA procurement program.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 14 Aeronautics and Space 5 2013-01-01 2013-01-01 false NASA procurement program. 1201.400 Section... AND GENERAL INFORMATION General Information § 1201.400 NASA procurement program. (a) The Office of... contact for NASA procurements. Although the procurements may be made by the field installations, selected...
14 CFR 1201.400 - NASA procurement program.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 14 Aeronautics and Space 5 2011-01-01 2010-01-01 true NASA procurement program. 1201.400 Section... AND GENERAL INFORMATION General Information § 1201.400 NASA procurement program. (a) The Office of... contact for NASA procurements. Although the procurements may be made by the field installations, selected...
14 CFR 1201.400 - NASA procurement program.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 14 Aeronautics and Space 5 2010-01-01 2010-01-01 false NASA procurement program. 1201.400 Section... AND GENERAL INFORMATION General Information § 1201.400 NASA procurement program. (a) The Office of... contact for NASA procurements. Although the procurements may be made by the field installations, selected...
Fuller, Christopher; Savage, Joan; Cookson, Barry; Hayward, Andrew; Cooper, Ben; Duckworth, Georgia; Michie, Susan; Murray, Miranda; Jeanes, Annette; Roberts, J; Teare, Louise; Charlett, Andre
2012-01-01
Objective To evaluate the impact of the Cleanyourhands campaign on rates of hospital procurement of alcohol hand rub and soap, report trends in selected healthcare associated infections, and investigate the association between infections and procurement. Design Prospective, ecological, interrupted time series study from 1 July 2004 to 30 June 2008. Setting 187 acute trusts in England and Wales. Intervention Installation of bedside alcohol hand rub, materials promoting hand hygiene and institutional engagement, regular hand hygiene audits, rolled out nationally from 1 December 2004. Main outcome measures Quarterly (that is, every three months) rates for each trust of hospital procurement of alcohol hand rub and liquid soap; Staphylococcus aureus bacteraemia (meticillin resistant (MRSA) and meticillin sensitive (MSSA)) and Clostridium difficile infection for each trust. Associations between procurement and infection rates assessed by mixed effect Poisson regression model (which also accounted for effect of bed occupancy, hospital type, and timing of other national interventions targeting these infections). Results Combined procurement of soap and alcohol hand rub tripled from 21.8 to 59.8 mL per patient bed day; procurement rose in association with each phase of the campaign. Rates fell for MRSA bacteraemia (1.88 to 0.91 cases per 10 000 bed days) and C difficile infection (16.75 to 9.49 cases). MSSA bacteraemia rates did not fall. Increased procurement of soap was independently associated with reduced C difficile infection throughout the study (adjusted incidence rate ratio for 1 mL increase per patient bed day 0.993, 95% confidence interval 0.990 to 0.996; P<0.0001). Increased procurement of alcohol hand rub was independently associated with reduced MRSA bacteraemia, but only in the last four quarters of the study (0.990, 0.985 to 0.995; P<0.0001). Publication of the Health Act 2006 was strongly associated with reduced MRSA bacteraemia (0.86, 0.75 to 0.98; P=0.02) and C difficile infection (0.75, 0.67 to 0.84; P<0.0001). Trust visits by Department of Health improvement teams were also associated with reduced MRSA bacteraemia (0.91, 0.83 to 0.99; P=0.03) and C difficile infection (0.80, 0.71 to 0.90; P=0.01), for at least two quarters after each visit. Conclusions The Cleanyourhands campaign was associated with sustained increases in hospital procurement of alcohol rub and soap, which the results suggest has an important role in reducing rates of some healthcare associated infections. National interventions for infection control undertaken in the context of a high profile political drive can reduce selected healthcare associated infections. PMID:22556101
Two autowire versions for CDC-3200 and IBM-360
NASA Technical Reports Server (NTRS)
Billingsley, J. B.
1972-01-01
Microelectronics program was initiated to evaluate circuitry, packaging methods, and fabrication approaches necessary to produce completely procured logic system. Two autowire programs were developed for CDC-3200 and IBM-360 computers for use in designing logic systems.
Federal Register 2010, 2011, 2012, 2013, 2014
2011-04-25
... on March 23, 2011 (76 FR 16450). The workers are engaged in activities related to the supply of design engineering, global procurement supply chain, and safety and reliability for the production of...
75 FR 4784 - Procurement List; Addition
Federal Register 2010, 2011, 2012, 2013, 2014
2010-01-29
... Procurement List. SUMMARY: This action adds to the Procurement List a service to be furnished by a nonprofit... Who Are Blind or Severely Disabled published a notice of proposed addition to the Procurement List... Committee has determined that the service listed below is suitable for procurement by the Federal Government...
14 CFR § 1201.400 - NASA procurement program.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 14 Aeronautics and Space 5 2014-01-01 2014-01-01 false NASA procurement program. § 1201.400... ORGANIZATION AND GENERAL INFORMATION General Information § 1201.400 NASA procurement program. (a) The Office of... contact for NASA procurements. Although the procurements may be made by the field installations, selected...
22 CFR 1006.220 - Are any procurement contracts included as covered transactions?
Code of Federal Regulations, 2011 CFR
2011-04-01
... 22 Foreign Relations 2 2011-04-01 2009-04-01 true Are any procurement contracts included as... DEBARMENT AND SUSPENSION (NONPROCUREMENT) Covered Transactions § 1006.220 Are any procurement contracts... procurement contracts awarded directly by a Federal agency; but (2) Do include some procurement contracts...
21 CFR 1404.220 - Are any procurement contracts included as covered transactions?
Code of Federal Regulations, 2011 CFR
2011-04-01
... 21 Food and Drugs 9 2011-04-01 2011-04-01 false Are any procurement contracts included as covered... DEBARMENT AND SUSPENSION (NONPROCUREMENT) Covered Transactions § 1404.220 Are any procurement contracts... procurement contracts awarded directly by a Federal agency; but (2) Do include some procurement contracts...
21 CFR 1404.220 - Are any procurement contracts included as covered transactions?
Code of Federal Regulations, 2010 CFR
2010-04-01
... 21 Food and Drugs 9 2010-04-01 2010-04-01 false Are any procurement contracts included as covered... DEBARMENT AND SUSPENSION (NONPROCUREMENT) Covered Transactions § 1404.220 Are any procurement contracts... procurement contracts awarded directly by a Federal agency; but (2) Do include some procurement contracts...
34 CFR 85.220 - Are any procurement contracts included as covered transactions?
Code of Federal Regulations, 2010 CFR
2010-07-01
... 34 Education 1 2010-07-01 2010-07-01 false Are any procurement contracts included as covered... DEBARMENT AND SUSPENSION (NONPROCUREMENT) Covered Transactions § 85.220 Are any procurement contracts... procurement contracts awarded directly by a Federal agency; but (2) Do include some procurement contracts...
Status of Europe's contribution to the ITER EC system
NASA Astrophysics Data System (ADS)
Albajar, F.; Aiello, G.; Alberti, S.; Arnold, F.; Avramidis, K.; Bader, M.; Batista, R.; Bertizzolo, R.; Bonicelli, T.; Braunmueller, F.; Brescan, C.; Bruschi, A.; von Burg, B.; Camino, K.; Carannante, G.; Casarin, V.; Castillo, A.; Cauvard, F.; Cavalieri, C.; Cavinato, M.; Chavan, R.; Chelis, J.; Cismondi, F.; Combescure, D.; Darbos, C.; Farina, D.; Fasel, D.; Figini, L.; Gagliardi, M.; Gandini, F.; Gantenbein, G.; Gassmann, T.; Gessner, R.; Goodman, T. P.; Gracia, V.; Grossetti, G.; Heemskerk, C.; Henderson, M.; Hermann, V.; Hogge, J. P.; Illy, S.; Ioannidis, Z.; Jelonnek, J.; Jin, J.; Kasparek, W.; Koning, J.; Krause, A. S.; Landis, J. D.; Latsas, G.; Li, F.; Mazzocchi, F.; Meier, A.; Moro, A.; Nousiainen, R.; Purohit, D.; Nowak, S.; Omori, T.; van Oosterhout, J.; Pacheco, J.; Pagonakis, I.; Platania, P.; Poli, E.; Preis, A. K.; Ronden, D.; Rozier, Y.; Rzesnicki, T.; Saibene, G.; Sanchez, F.; Sartori, F.; Sauter, O.; Scherer, T.; Schlatter, C.; Schreck, S.; Serikov, A.; Siravo, U.; Sozzi, C.; Spaeh, P.; Spichiger, A.; Strauss, D.; Takahashi, K.; Thumm, M.; Tigelis, I.; Vaccaro, A.; Vomvoridis, J.; Tran, M. Q.; Weinhorst, B.
2015-03-01
The electron cyclotron (EC) system of ITER for the initial configuration is designed to provide 20MW of RF power into the plasma during 3600s and a duty cycle of up to 25% for heating and (co and counter) non-inductive current drive, also used to control the MHD plasma instabilities. The EC system is being procured by 5 domestic agencies plus the ITER Organization (IO). F4E has the largest fraction of the EC procurements, which includes 8 high voltage power supplies (HVPS), 6 gyrotrons, the ex-vessel waveguides (includes isolation valves and diamond windows) for all launchers, 4 upper launchers and the main control system. F4E is working with IO to improve the overall design of the EC system by integrating consolidated technological advances, simplifying the interfaces, and doing global engineering analysis and assessments of EC heating and current drive physics and technology capabilities. Examples are the optimization of the HVPS and gyrotron requirements and performance relative to power modulation for MHD control, common qualification programs for diamond window procurements, assessment of the EC grounding system, and the optimization of the launcher steering angles for improved EC access. Here we provide an update on the status of Europe's contribution to the ITER EC system, and a summary of the global activities underway by F4E in collaboration with IO for the optimization of the subsystems.
Wafula, Francis; Agweyu, Ambrose; Macintyre, Kate
2013-12-30
Although procurement consumes nearly 40% of Global Fund's money, no analyses have been published to show how costs vary across regions and time. This paper presents an analysis of malaria-related commodity procurement data from 79 countries, as reported through the Global Fund's price and quality reporting (PQR) system for the 2005-2012 period. Data were analysed for the three most widely procured commodities for prevention, diagnosis and treatment of malaria. These were long-lasting insecticide-treated nets (LLINs), malaria rapid diagnostic tests (RDTs) and the artemether/lumefantrine (AL) combination treatment. Costs were compared across time (2005-2012), regions, and between individual procurement reported through the PQR and pooled procurement reported through the Global Fund's voluntary pooled procurement (VPP) system. All costs were adjusted for inflation and reported in US dollars. The data included 1,514 entries reported from 79 countries over seven years. Of these, 492 entries were for LLINs, 330 for RDTs and 692 for AL. Considerable variations were seen by commodity, although none showed an increase in cost. The costs for LLINs, RDTs and AL all dropped significantly over the period of analysis. Regional variations were also seen, with the cost for all three commodities showing significant variations. The median cost for a single LLIN ranged from USD 4.3 in East Asia to USD 5.0 in West and Central Africa. The cost of a single RDT was lowest in West and Central Africa at US$ 0.57, and highest in the Latin American region at US$ 1.1. AL had the narrowest margin of between US$ 0.06 per tablet in sub-Saharan Africa and South Asia, and US$ 0.08 in the Latin American and Eastern Europe regions. This paper concludes that global procurement costs do vary by region and have reduced overall over time. This suggests a mature market is operating when viewed from the global level, but regional variation needs further attention. Such analyses should be done more often to identify and correct market insufficiencies.
41 CFR 101-25.101-2 - Supply through storage and issue.
Code of Federal Regulations, 2014 CFR
2014-07-01
... Management Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS SUPPLY AND PROCUREMENT 25-GENERAL 25.1... close inspection or testing is necessary to secure quality, or where repetitive inspection and test of... distribution system does not exist to assure availability at use point. (6) Where volume purchases are...
41 CFR 101-25.101-2 - Supply through storage and issue.
Code of Federal Regulations, 2011 CFR
2011-07-01
... Management Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS SUPPLY AND PROCUREMENT 25-GENERAL 25.1... close inspection or testing is necessary to secure quality, or where repetitive inspection and test of... distribution system does not exist to assure availability at use point. (6) Where volume purchases are...
Public Perspectives on Biospecimen Procurement: What Biorepositories Should Consider
L'Heureux, Jamie; Murray, Jeffrey C.; Newbury, Elizabeth; Shinkunas, Laura
2013-01-01
Purpose Human biospecimens are central to biobanking efforts, yet how members of the public think about biobank procurement strategies is not well understood. This study aimed to explore public perspectives toward the procurement of residual clinical material versus “direct” procurement strategies such as the drawing of blood. Methods Members of the public residing in and beyond the biobank catchment area of the University of Iowa Hospitals and Clinics were randomly selected to participate in focus groups and a telephone survey. Results The majority of survey participants (75%, n=559) found both residual and direct procurement strategies equally workable. Small proportions preferred either residual (15%; n=117) or direct (5%; n=40) procurement. Focus group participants (n=48) could identify benefits to both procurement strategies, but raised concerns about possible donor inconvenience/discomfort and reduced biospecimen accrual in the case of direct procurement. Residual procurement raised concerns about lower-quality samples being procured without full donor awareness. Conclusion Biobanks should consider that members of the public in their research programs may be willing to make specimen donations regardless of whether a residual or direct procurement strategy is employed. Limiting patient discomfort and inconvenience may make direct procurement strategies more acceptable to some members of the public. Ensuring donor awareness through effective informed consent may allay public concerns about the indirectness of donating clinical biospecimens. PMID:24850089
14 CFR 29.621 - Casting factors.
Code of Federal Regulations, 2011 CFR
2011-01-01
... established. (3) For castings procured to a specification that guarantees the mechanical properties of the material in the casting and provides for demonstration of these properties by test of coupons cut from the...
14 CFR 27.621 - Casting factors.
Code of Federal Regulations, 2010 CFR
2010-01-01
... established. (3) For castings procured to a specification that guarantees the mechanical properties of the material in the casting and provides for demonstration of these properties by test of coupons cut from the...
14 CFR 29.621 - Casting factors.
Code of Federal Regulations, 2010 CFR
2010-01-01
... established. (3) For castings procured to a specification that guarantees the mechanical properties of the material in the casting and provides for demonstration of these properties by test of coupons cut from the...
14 CFR 27.621 - Casting factors.
Code of Federal Regulations, 2011 CFR
2011-01-01
... established. (3) For castings procured to a specification that guarantees the mechanical properties of the material in the casting and provides for demonstration of these properties by test of coupons cut from the...
Attitude propulsion technology for TOPS
NASA Technical Reports Server (NTRS)
Moynihan, P. I.
1972-01-01
The thermoelectric outer planet spacecraft (TOPS) attitude propulsion subsystem (APS) effort is discussed. It includes the tradeoff rationale that went into the selection of an anhydrous hydrazine baseline system, followed by a discussion of the 0.22 N thruster and its integration into a portable, self-contained propulsion module that was designed, developed, and man rated to support the TOPS single-axis attitude control tests. The results of a cold-start feasibility demonstration with a modified thruster are presented. A description of three types of 0.44 thrusters that were procured for in-house evaluation is included along with the results of the test program. This is followed by a description of the APS feed system components, their evaluations, and a discussion of an evaluation of elastomeric material for valve seat seals. A list of new technology items which will be of value for application to future systems of this type is included.
Large space telescope engineering scale model optical design
NASA Technical Reports Server (NTRS)
Facey, T. A.
1973-01-01
The objective is to develop the detailed design and tolerance data for the LST engineering scale model optical system. This will enable MSFC to move forward to the optical element procurement phase and also to evaluate tolerances, manufacturing requirements, assembly/checkout procedures, reliability, operational complexity, stability requirements of the structure and thermal system, and the flexibility to change and grow.
Enabling Technologies for Medium Additive Manufacturing (MAAM)
DOE Office of Scientific and Technical Information (OSTI.GOV)
Richardson, Bradley S.; Love, Lonnie J.; Chesser, Phillip C.
ORNL has worked with Cosine Additive, Inc. on the design of MAAM extrusion components. The objective is to improve the print speed and part quality. A pellet extruder has been procured and integrated into the MAAM printer. Print speed has been greatly enhanced. In addition, ORNL and Cosine Additive have worked on alternative designs for a pellet drying and feed system.
The Design and Implementation of a Read Prediction Buffer
1992-12-01
City, State, and ZIP Code) 7b ADDRESS (City, State. and ZIP Code) 8a. NAME OF FUNDING /SPONSORING 8b. OFFICE SYMBOL 9 PROCUREMENT INSTRUMENT... 9 E. THESIS STRUCTURE.. . .... ............... 9 II. READ PREDICTION ALGORITHM AND BUFFER DESIGN 10 A. THE READ PREDICTION ALGORITHM...29 Figure 9 . Basic Multiplexer Cell .... .......... .. 30 Figure 10. Block Diagram Simulation Labels ......... 38 viii I. INTRODUCTION A
Transition in Gas Turbine Engine Control System Architecture: Modular, Distributed, Embedded
2009-08-01
Design + Development + Certification + Procurement + Life Cycle Cost = Net Savings for our Customers Approved for Public Release 16 Economic ...Supporting Small Quantity Electronics Need Broadly Applicable High Temperature Electronics Supply Base Approved for Public Release 17 Economic ...rc ec ures Approved for Public Release 18 Economic Drivers for New FADEC Designs FADEC Implementation Time Pacing Engine Development Issues • FADEC
13 CFR 121.407 - What are the size procedures for multiple item procurements?
Code of Federal Regulations, 2010 CFR
2010-01-01
... Requirements for Government Procurement § 121.407 What are the size procedures for multiple item procurements? If a procurement calls for two or more specific end items or types of services with different size... multiple item procurements? 121.407 Section 121.407 Business Credit and Assistance SMALL BUSINESS...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Dorr, Kent A.; Ostrom, Michael J.; Freeman-Pollard, Jhivaun R.
CH2M Hill Plateau Remediation Company (CHPRC) designed, constructed, commissioned, and began operation of the largest groundwater pump and treatment facility in the U.S. Department of Energy's (DOE) nationwide complex. This one-of-a-kind groundwater pump and treatment facility, located at the Hanford Nuclear Reservation Site (Hanford Site) in Washington State, was built in an accelerated manner with American Recovery and Reinvestment Act (ARRA) funds and has attained Leadership in Energy and Environmental Design (LEED) GOLD certification, which makes it the first non-administrative building in the DOE Office of Environmental Management complex to earn such an award. There were many contractual, technical, configurationmore » management, quality, safety, and LEED challenges associated with the design, procurement, construction, and commissioning of this $95 million, 52,000 ft groundwater pump and treatment facility. This paper will present the Project and LEED accomplishments, as well as Lessons Learned by CHPRC when additional ARRA funds were used to accelerate design, procurement, construction, and commissioning of the 200 West Groundwater Pump and Treatment (2W P&T) Facility to meet DOE's mission of treating contaminated groundwater at the Hanford Site with a new facility by June 28, 2012.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Dorr, Kent A.; Ostrom, Michael J.; Freeman-Pollard, Jhivaun R.
CH2M Hill Plateau Remediation Company (CHPRC) designed, constructed, commissioned, and began operation of the largest groundwater pump and treatment facility in the U.S. Department of Energy’s (DOE) nationwide complex. This one-of-a-kind groundwater pump and treatment facility, located at the Hanford Nuclear Reservation Site (Hanford Site) in Washington State, was built to an accelerated schedule with American Recovery and Reinvestment Act (ARRA) funds. There were many contractual, technical, configuration management, quality, safety, and Leadership in Energy and Environmental Design (LEED) challenges associated with the design, procurement, construction, and commissioning of this $95 million, 52,000 ft groundwater pump and treatment facility tomore » meet DOE’s mission objective of treating contaminated groundwater at the Hanford Site with a new facility by June 28, 2012. The project team’s successful integration of the project’s core values and green energy technology throughout design, procurement, construction, and start-up of this complex, first-of-its-kind Bio Process facility resulted in successful achievement of DOE’s mission objective, as well as attainment of LEED GOLD certification, which makes this Bio Process facility the first non-administrative building in the DOE Office of Environmental Management complex to earn such an award.« less
Mi, Zhibao; Novitzky, Dimitri; Collins, Joseph F; Cooper, David KC
2015-01-01
The management of brain-dead organ donors is complex. The use of inotropic agents and replacement of depleted hormones (hormonal replacement therapy) is crucial for successful multiple organ procurement, yet the optimal hormonal replacement has not been identified, and the statistical adjustment to determine the best selection is not trivial. Traditional pair-wise comparisons between every pair of treatments, and multiple comparisons to all (MCA), are statistically conservative. Hsu’s multiple comparisons with the best (MCB) – adapted from the Dunnett’s multiple comparisons with control (MCC) – has been used for selecting the best treatment based on continuous variables. We selected the best hormonal replacement modality for successful multiple organ procurement using a two-step approach. First, we estimated the predicted margins by constructing generalized linear models (GLM) or generalized linear mixed models (GLMM), and then we applied the multiple comparison methods to identify the best hormonal replacement modality given that the testing of hormonal replacement modalities is independent. Based on 10-year data from the United Network for Organ Sharing (UNOS), among 16 hormonal replacement modalities, and using the 95% simultaneous confidence intervals, we found that the combination of thyroid hormone, a corticosteroid, antidiuretic hormone, and insulin was the best modality for multiple organ procurement for transplantation. PMID:25565890
The PRIMA Test Facility: SPIDER and MITICA test-beds for ITER neutral beam injectors
NASA Astrophysics Data System (ADS)
Toigo, V.; Piovan, R.; Dal Bello, S.; Gaio, E.; Luchetta, A.; Pasqualotto, R.; Zaccaria, P.; Bigi, M.; Chitarin, G.; Marcuzzi, D.; Pomaro, N.; Serianni, G.; Agostinetti, P.; Agostini, M.; Antoni, V.; Aprile, D.; Baltador, C.; Barbisan, M.; Battistella, M.; Boldrin, M.; Brombin, M.; Dalla Palma, M.; De Lorenzi, A.; Delogu, R.; De Muri, M.; Fellin, F.; Ferro, A.; Fiorentin, A.; Gambetta, G.; Gnesotto, F.; Grando, L.; Jain, P.; Maistrello, A.; Manduchi, G.; Marconato, N.; Moresco, M.; Ocello, E.; Pavei, M.; Peruzzo, S.; Pilan, N.; Pimazzoni, A.; Recchia, M.; Rizzolo, A.; Rostagni, G.; Sartori, E.; Siragusa, M.; Sonato, P.; Sottocornola, A.; Spada, E.; Spagnolo, S.; Spolaore, M.; Taliercio, C.; Valente, M.; Veltri, P.; Zamengo, A.; Zaniol, B.; Zanotto, L.; Zaupa, M.; Boilson, D.; Graceffa, J.; Svensson, L.; Schunke, B.; Decamps, H.; Urbani, M.; Kushwah, M.; Chareyre, J.; Singh, M.; Bonicelli, T.; Agarici, G.; Garbuglia, A.; Masiello, A.; Paolucci, F.; Simon, M.; Bailly-Maitre, L.; Bragulat, E.; Gomez, G.; Gutierrez, D.; Mico, G.; Moreno, J.-F.; Pilard, V.; Kashiwagi, M.; Hanada, M.; Tobari, H.; Watanabe, K.; Maejima, T.; Kojima, A.; Umeda, N.; Yamanaka, H.; Chakraborty, A.; Baruah, U.; Rotti, C.; Patel, H.; Nagaraju, M. V.; Singh, N. P.; Patel, A.; Dhola, H.; Raval, B.; Fantz, U.; Heinemann, B.; Kraus, W.; Hanke, S.; Hauer, V.; Ochoa, S.; Blatchford, P.; Chuilon, B.; Xue, Y.; De Esch, H. P. L.; Hemsworth, R.; Croci, G.; Gorini, G.; Rebai, M.; Muraro, A.; Tardocchi, M.; Cavenago, M.; D'Arienzo, M.; Sandri, S.; Tonti, A.
2017-08-01
The ITER Neutral Beam Test Facility (NBTF), called PRIMA (Padova Research on ITER Megavolt Accelerator), is hosted in Padova, Italy and includes two experiments: MITICA, the full-scale prototype of the ITER heating neutral beam injector, and SPIDER, the full-size radio frequency negative-ions source. The NBTF realization and the exploitation of SPIDER and MITICA have been recognized as necessary to make the future operation of the ITER heating neutral beam injectors efficient and reliable, fundamental to the achievement of thermonuclear-relevant plasma parameters in ITER. This paper reports on design and R&D carried out to construct PRIMA, SPIDER and MITICA, and highlights the huge progress made in just a few years, from the signature of the agreement for the NBTF realization in 2011, up to now—when the buildings and relevant infrastructures have been completed, SPIDER is entering the integrated commissioning phase and the procurements of several MITICA components are at a well advanced stage.
Chromosomes and plant cell division in space
NASA Technical Reports Server (NTRS)
Krikorian, A. D.
1988-01-01
The objectives were: examination of chromosomal aberrations; development of an experimental system; and engineering design units (EDUs) evaluation. Evaluation criteria are presented. Procedures were developed for shuttle-based investigations which result in the procurement of plant root tips for subsequent cytological examination.
7 CFR 1724.70 - Standard forms of contracts for borrowers.
Code of Federal Regulations, 2010 CFR
2010-01-01
... SERVICE, DEPARTMENT OF AGRICULTURE ELECTRIC ENGINEERING, ARCHITECTURAL SERVICES AND DESIGN POLICIES AND... construction, procurement, engineering services, and architectural services financed by a loan made or... prescribes RUS procedures in promulgating electric program standard contract forms and identifies those forms...
77 FR 72653 - Designation of Product Categories for Federal Procurement
Federal Register 2010, 2011, 2012, 2013, 2014
2012-12-05
... cleaners; automotive care products; engine crankcase oil; gasoline fuel additives; metal cleaners and... crankcase oil; gasoline fuel additives; metal cleaners and corrosion removers; microbial cleaning products... for biobased feed stock? Does manufacturing of products within this product category increase...
10 CFR 603.1005 - General responsibilities.
Code of Federal Regulations, 2010 CFR
2010-01-01
... incorporate clauses from the Federal Acquisition Regulation (48 CFR parts 1-53) or Department of Energy Acquisition Regulation (48 CFR parts 901-970) because those provisions are designed for procurement contracts...) Be written in clear and concise language, to minimize potential ambiguity. ...
32 CFR 159.5 - Responsibilities.
Code of Federal Regulations, 2010 CFR
2010-07-01
... Defense for Logistics and Materiel Readiness, shall monitor the registering, processing, and accounting of PSC personnel in an area of contingency operations. (b) The Director, Defense Procurement and... environment, in consultation with the relevant Chief of Mission in designated areas of combat operations. (2...
32 CFR 159.5 - Responsibilities.
Code of Federal Regulations, 2011 CFR
2011-07-01
... Defense for Logistics and Materiel Readiness, shall monitor the registering, processing, and accounting of PSC personnel in an area of contingency operations. (b) The Director, Defense Procurement and... environment, in consultation with the relevant Chief of Mission in designated areas of combat operations. (2...
10 CFR 603.1005 - General responsibilities.
Code of Federal Regulations, 2013 CFR
2013-01-01
... incorporate clauses from the Federal Acquisition Regulation (48 CFR parts 1-53) or Department of Energy Acquisition Regulation (48 CFR parts 901-970) because those provisions are designed for procurement contracts...) Be written in clear and concise language, to minimize potential ambiguity. ...
10 CFR 603.1005 - General responsibilities.
Code of Federal Regulations, 2014 CFR
2014-01-01
... incorporate clauses from the Federal Acquisition Regulation (48 CFR parts 1-53) or Department of Energy Acquisition Regulation (48 CFR parts 901-970) because those provisions are designed for procurement contracts...) Be written in clear and concise language, to minimize potential ambiguity. ...
10 CFR 603.1005 - General responsibilities.
Code of Federal Regulations, 2012 CFR
2012-01-01
... incorporate clauses from the Federal Acquisition Regulation (48 CFR parts 1-53) or Department of Energy Acquisition Regulation (48 CFR parts 901-970) because those provisions are designed for procurement contracts...) Be written in clear and concise language, to minimize potential ambiguity. ...
10 CFR 603.1005 - General responsibilities.
Code of Federal Regulations, 2011 CFR
2011-01-01
... incorporate clauses from the Federal Acquisition Regulation (48 CFR parts 1-53) or Department of Energy Acquisition Regulation (48 CFR parts 901-970) because those provisions are designed for procurement contracts...) Be written in clear and concise language, to minimize potential ambiguity. ...