Sample records for design work plan

  1. FY 95 engineering work plan for the design reconstitution implementation action plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bigbee, J.D.

    Design reconstitution work is to be performed as part of an overall effort to upgrade Configuration Management (CM) at TWRS. WHC policy is to implement a program that is compliant with DOE-STD-1073-93, Guide for Operational Configuration Management Program. DOE-STD-1073 requires an adjunct program for reconstituting design information. WHC-SD-WM-CM-009, Design Reconstitution Program Plan for Waste Tank Farms and 242-A Evaporator of Tank Waste Remediation System, is the TWRS plan for meeting DOE-STD-1073 design reconstitution requirements. The design reconstitution plan is complex requiring significant time and effort for implementation. In order to control costs, and integrate the work into other TWRS activities,more » a Design Reconstitution Implementation Action Plan (DR IAP) will be developed, and approved by those organizations having ownership or functional interest in this activity.« less

  2. Human-Automation Integration: Principle and Method for Design and Evaluation

    NASA Technical Reports Server (NTRS)

    Billman, Dorrit; Feary, Michael

    2012-01-01

    Future space missions will increasingly depend on integration of complex engineered systems with their human operators. It is important to ensure that the systems that are designed and developed do a good job of supporting the needs of the work domain. Our research investigates methods for needs analysis. We included analysis of work products (plans for regulation of the space station) as well as work processes (tasks using current software), in a case study of Attitude Determination and Control Officers (ADCO) planning work. This allows comparing how well different designs match the structure of the work to be supported. Redesigned planning software that better matches the structure of work was developed and experimentally assessed. The new prototype enabled substantially faster and more accurate performance in plan revision tasks. This success suggests the approach to needs assessment and use in design and evaluation is promising, and merits investigatation in future research.

  3. Perspectives and Plans for Graduate Studies. 11. Engineering 1974. E. Industrial Engineering and Systems Design. Report No. 74-22.

    ERIC Educational Resources Information Center

    Ontario Council on Graduate Studies, Toronto. Advisory Committee on Academic Planning.

    On the instruction of the Council of Ontario Universities, the Advisory Committee on Academic Planning in cooperation with the Committee of Ontario Deans of Engineering has conducted a planning assessment for doctoral work in industrial engineering and systems design. Recommendations for doctoral work in engineering studies are presented.…

  4. Making a successful transition to cash balance. Using employee choice and financial education.

    PubMed

    Scahill, P; Wiley, P

    2000-01-01

    As employee work patterns change, the need for flexible plan design has increased. Hybrid plans such as cash balance plans offer a plan design variation that incorporates elements of the traditional defined benefit plan as well as those of defined contribution plans. This article examines plan design trends and discusses both negative and positive reactions to those trends. Finally, the solution of offering choice to plan participants is suggested, and the issues that must be considered are discussed.

  5. Cast Off expansion plan by rapid improvement through Optimization tool design, Tool Parameters and using Six Sigma’s ECRS Technique

    NASA Astrophysics Data System (ADS)

    Gopalakrishnan, T.; Saravanan, R.

    2017-03-01

    Powerful management concepts step-up the quality of the product, time saving in producing the product thereby increase the production rate, improves tools and techniques, work culture, work place and employee motivation and morale. In this paper discussed about the case study of optimizing the tool design, tool parameters to cast off expansion plan according ECRS technique. The proposed designs and optimal tool parameters yielded best results and meet the customer demand without expansion plan. Hence the work yielded huge savings of money (direct and indirect cost), time and improved the motivation and more of employees significantly.

  6. Social Work Education Planning & Assessment System: Handbook of Fundamental Assessment Concepts; Manual for Project Managers; Appendices.

    ERIC Educational Resources Information Center

    Social and Rehabilitation Service (DHEW), Washington, DC.

    The Social Work Education Planning and Assessment (SWEPA) System is an information system designed to function within social work education toward two main purposes: (1) to help schools more effectively specify their own educational objectives, plan their social work education projects to achieve these objectives, mark their progress toward this…

  7. 7 CFR 25.403. - Ongoing 2-year work plan requirement.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 25.403. Agriculture Office of the Secretary of Agriculture RURAL EMPOWERMENT ZONES AND ENTERPRISE COMMUNITIES Post-Designation Requirements § 25.403. Ongoing 2-year work plan requirement. (a) Each Empowerment... conditional upon the designation of the community as an Empowerment Zone; and (iv) Documentation of...

  8. 7 CFR 25.403. - Ongoing 2-year work plan requirement.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 25.403. Agriculture Office of the Secretary of Agriculture RURAL EMPOWERMENT ZONES AND ENTERPRISE COMMUNITIES Post-Designation Requirements § 25.403. Ongoing 2-year work plan requirement. (a) Each Empowerment... conditional upon the designation of the community as an Empowerment Zone; and (iv) Documentation of...

  9. 7 CFR 25.403. - Ongoing 2-year work plan requirement.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 25.403. Agriculture Office of the Secretary of Agriculture RURAL EMPOWERMENT ZONES AND ENTERPRISE COMMUNITIES Post-Designation Requirements § 25.403. Ongoing 2-year work plan requirement. (a) Each Empowerment... conditional upon the designation of the community as an Empowerment Zone; and (iv) Documentation of...

  10. 7 CFR 25.403. - Ongoing 2-year work plan requirement.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 25.403. Agriculture Office of the Secretary of Agriculture RURAL EMPOWERMENT ZONES AND ENTERPRISE COMMUNITIES Post-Designation Requirements § 25.403. Ongoing 2-year work plan requirement. (a) Each Empowerment... conditional upon the designation of the community as an Empowerment Zone; and (iv) Documentation of...

  11. 40 CFR 63.306 - Work practice standards.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... Standards for Coke Oven Batteries § 63.306 Work practice standards. (a) Work practice plan. On or before... plan for each coke oven battery. The plan shall be designed to achieve compliance with visible emission limitations for coke oven doors, topside port lids, offtake systems, and charging operations under this...

  12. 40 CFR 63.306 - Work practice standards.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... for Coke Oven Batteries § 63.306 Work practice standards. (a) Work practice plan. On or before... plan for each coke oven battery. The plan shall be designed to achieve compliance with visible emission limitations for coke oven doors, topside port lids, offtake systems, and charging operations under this...

  13. 40 CFR 63.306 - Work practice standards.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Standards for Coke Oven Batteries § 63.306 Work practice standards. (a) Work practice plan. On or before... plan for each coke oven battery. The plan shall be designed to achieve compliance with visible emission limitations for coke oven doors, topside port lids, offtake systems, and charging operations under this...

  14. 40 CFR 63.306 - Work practice standards.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... Standards for Coke Oven Batteries § 63.306 Work practice standards. (a) Work practice plan. On or before... plan for each coke oven battery. The plan shall be designed to achieve compliance with visible emission limitations for coke oven doors, topside port lids, offtake systems, and charging operations under this...

  15. Intelligent control of a planning system for astronaut training.

    PubMed

    Ortiz, J; Chen, G

    1999-07-01

    This work intends to design, analyze and solve, from the systems control perspective, a complex, dynamic, and multiconstrained planning system for generating training plans for crew members of the NASA-led International Space Station. Various intelligent planning systems have been developed within the framework of artificial intelligence. These planning systems generally lack a rigorous mathematical formalism to allow a reliable and flexible methodology for their design, modeling, and performance analysis in a dynamical, time-critical, and multiconstrained environment. Formulating the planning problem in the domain of discrete-event systems under a unified framework such that it can be modeled, designed, and analyzed as a control system will provide a self-contained theory for such planning systems. This will also provide a means to certify various planning systems for operations in the dynamical and complex environments in space. The work presented here completes the design, development, and analysis of an intricate, large-scale, and representative mathematical formulation for intelligent control of a real planning system for Space Station crew training. This planning system has been tested and used at NASA-Johnson Space Center.

  16. Creating Your Life's Work Portfolio. An Interactive Career and Life Planning Workbook.

    ERIC Educational Resources Information Center

    1998

    Designed for those beginning a working life or with years of experience, this book leads the user through collecting records that document work history and affirm successes. It provides a step-by-step process to help plan one's life's work, make career decisions, and develop plans for new career directions and a structure to learn career planning…

  17. Library Automation and Facility Planning.

    ERIC Educational Resources Information Center

    Cohen, Aaron; Cohen, Elaine

    This seminar and workbook are designed to aid librarians in planning and designing attractive and efficient libraries in light of the changing technologies of the 1980s. It is based on the premise that the electronic revolution of the 1980s will cause substantial changes in the work force, work processes, and the nature of physical layouts of…

  18. Design, fabrication, test, qualification and price analysis of third generation design solar cell modules. Part 1: Intermediate load module

    NASA Technical Reports Server (NTRS)

    Bottenberg, W. R.

    1981-01-01

    The updated program plan and narrative reflects the design and development work done and progress made in establishing a viable design for these modules. Design alterations from the preproduction plan are discussed based on experience gained during the preproduction phase of the program.

  19. The Educator's "Action" Office.

    ERIC Educational Resources Information Center

    Martin, Dikran J.

    Design criteria, standards, and human factors related to designing and planning flexible and efficient work environments for college faculty members are overviewed with six model (example) office plans included. The physical and psychological design needs in such an office facility are given, with task performance data on student faculty…

  20. Work plan for cone penetrometer comparison testing.

    DOT National Transportation Integrated Search

    2011-01-01

    The work plan and experimental design are developed around aiding engineers and geologists within the : Wisconsin Department of Transportation to understand the mechanisms controlling cone penetration test : results so that they can decide when the t...

  1. Design, fabrication, test, qualification and price analysis for third generation design solar cell modules

    NASA Technical Reports Server (NTRS)

    1980-01-01

    An updated program plan is presented showing the task descriptions depicting the work, progress, achievements, and the cause of any deviations from the original plan (SC-1), and how this impacted on the original schedule of the program. In addition there is an update documenting all design alterations made during the pre-production phase and a complete up to date set of engineering and manufacturing documentation (CM-1). The purpose of the work in the original plan was to explore, design, develop, test, and deliver 1000 watts of prototype flat plate, photovoltaic modules appropriate for use in applications in the 20 to 500 kilowatt range and which show potential for meeting the 1986 cost goals.

  2. Enroute flight planning: The design of cooperative planning systems

    NASA Technical Reports Server (NTRS)

    Smith, Philip J.; Layton, Chuck; Mccoy, Elaine

    1990-01-01

    Design concepts and principles to guide in the building of cooperative problem solving systems are being developed and evaluated. In particular, the design of cooperative systems for enroute flight planning is being studied. The investigation involves a three stage process, modeling human performance in existing environments, building cognitive artifacts, and studying the performance of people working in collaboration with these artifacts. The most significant design concepts and principles identified thus far are the principle focus.

  3. 40 CFR 35.905 - Definitions.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ..., architectural, legal, fiscal, or economic investigations or studies, surveys, designs, plans, working drawings... such works were designed and constructed. The term operation and maintenance includes replacement...” fittings designed for connection with those facilities. The facilities which convey waste water from...

  4. 40 CFR 35.905 - Definitions.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ..., architectural, legal, fiscal, or economic investigations or studies, surveys, designs, plans, working drawings... such works were designed and constructed. The term operation and maintenance includes replacement...” fittings designed for connection with those facilities. The facilities which convey waste water from...

  5. 40 CFR 35.905 - Definitions.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ..., architectural, legal, fiscal, or economic investigations or studies, surveys, designs, plans, working drawings... such works were designed and constructed. The term operation and maintenance includes replacement...” fittings designed for connection with those facilities. The facilities which convey waste water from...

  6. 40 CFR 35.905 - Definitions.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ..., architectural, legal, fiscal, or economic investigations or studies, surveys, designs, plans, working drawings... such works were designed and constructed. The term operation and maintenance includes replacement...” fittings designed for connection with those facilities. The facilities which convey waste water from...

  7. 40 CFR 35.905 - Definitions.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ..., architectural, legal, fiscal, or economic investigations or studies, surveys, designs, plans, working drawings... such works were designed and constructed. The term operation and maintenance includes replacement...” fittings designed for connection with those facilities. The facilities which convey waste water from...

  8. International Space Station: 6-8 Hands-on Science and Math Lesson Plans.

    ERIC Educational Resources Information Center

    Armstrong, Pat

    These lesson plans, designed for grades 6-8, have been developed to provide a guide to hands-on experience in science and math. They focus on an International Space Station and are designed for use with students working in groups. The three lesson plans highlighting the importance of the scientific method are: (1) International Space Station…

  9. Ergonomic risk assessment with DesignCheck to evaluate assembly work in different phases of the vehicle development process.

    PubMed

    Winter, Gabriele; Schaub, Karlheinz G; Großmann, Kay; Laun, Gerhard; Landau, Kurt; Bruder, Ralph

    2012-01-01

    Occupational hazards exist, if the design of the work situation is not in accordance with ergonomic design principles. At assembly lines ergonomics is applied to the design of work equipment and tasks and to work organisation. The ignoring of ergonomic principles in planning and design of assembly work leads to unfavourable working posture, action force and material handling. Disorders of the musculoskeletal system are of a common occurrence throughout Europe. Musculoskeletal disorders are a challenge against the background of disabled workers. The changes in a worker's capability have to be regarded in the conception of redesigned and new assembly lines. In this way ergonomics becomes progressively more important in planning and design of vehicles: The objective of ergonomic design in different stages of the vehicles development process is to achieve an optimal adaptation of the assembly work to workers. Hence the ergonomic screening tool "Design Check" (DC) was developed to identify ergonomic deficits in workplace layouts. The screening-tool is based on the current ergonomic state of the art in the design of physical work and relevant EU legal requirements. It was tested within a federal German research project at selected work stations at the assembly lines at Dr.-Ing. h.c. F. Porsche AG / Stuttgart. Meanwhile the application of the screening-tool DC is transferred in other parts of the Porsche AG, Stuttgart. It is also realized as an ergonomic standard method to perform assembly work in different phases of the vehicle development process.

  10. Work Zone Design and Operations Enhancements

    DOT National Transportation Integrated Search

    2010-02-01

    Oregon Department of Transportation contractors are required to implement Traffic Control Plans (TCPs) to protect and direct traffic through work zones. The design and implementation of TCPs have shown variation from project-to-project across the Sta...

  11. Design for effective development and prototyping of the HL-20

    NASA Astrophysics Data System (ADS)

    Urie, David M.; Floreck, Paul A.; McMorris, John A.; Elvin, John D.

    1993-10-01

    A feasibility study of the HL-20 personnel launch system (PLS) concept was conducted by a team which focused on creating a PLS design approach and an accelerated development plan consistent with the historical 'Skunk Works' approach to rapid prototyping. Technical design, manufacturing, system testing, and operations and support elements of the predefined baseline concept were evaluated. An initial phase program, featuring a concurrent system test during design and development, leading to the orbital flight of an unmanned HL-20 prototype on a Titan III launch system, was prescribed. A second-phase development and manufacturing plan leading to system operational status was also formulated. Baseline design feature modifications were made when necessary, without compromise to performance, to satisfy the prototype development plan. Technical design details and off-the-shelf hardware candidates were also identified for several subsystems, including the launch-system interface adapter/emergency escape system. The technical feasibility of the system and applicability of the Skunk Works approach to development of the HL-20/PLS were verified.

  12. The Technical Work Plan Tracking Tool

    NASA Technical Reports Server (NTRS)

    Chullen, Cinda; Leighton, Adele; Weller, Richard A.; Woodfill, Jared; Parkman, William E.; Ellis, Glenn L.; Wilson, Marilyn M.

    2003-01-01

    The Technical Work Plan Tracking Tool is a web-based application that enables interactive communication and approval of contract requirements that pertain to the administration of the Science, Engineering, Analysis, and Test (SEAT) contract at Johnson Space Center. The implementation of the application has (1) shortened the Technical Work Plan approval process, (2) facilitated writing and documenting requirements in a performance-based environment with associated surveillance plans, (3) simplified the contractor s estimate of the cost for the required work, and (4) allowed for the contractor to document how they plan to accomplish the work. The application is accessible to over 300 designated NASA and contractor employees via two Web sites. For each employee, the application regulates access according to the employee s authority to enter, view, and/or print out diverse information, including reports, work plans, purchase orders, and financial data. Advanced features of this application include on-line approval capability, automatic e-mail notifications requesting review by subsequent approvers, and security inside and outside the firewall.

  13. Work zone design and operation enhancements : final report, March 2010.

    DOT National Transportation Integrated Search

    2010-02-01

    Oregon Department of Transportation contractors are required to implement Traffic Control Plans (TCPs) to protect and direct traffic through work zones. The design and implementation of TCPs have shown variation from project-to-project across the Sta...

  14. Investigating University Educators' Design Thinking and the Implications for Design Support Tools

    ERIC Educational Resources Information Center

    Bennett, Sue; Agostinho, Shirley; Lockyer, Lori

    2016-01-01

    All university educators perform design work as they prepare and plan learning experiences for their students. How such design work is undertaken, conceptualised, and optimally supported is the focus of ongoing research for the authors. The purpose of this article is to present the results of a research study that sought to gain a richer…

  15. 40 CFR 35.2050 - Effect of approval or certification of documents.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... OTHER FEDERAL ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works § 35.2050 Effect of approval or certification of documents. Review or approval of facilities plans, design drawings... relieve the grantee of its responsibility to properly plan, design, build and effectively operate and...

  16. Options for Parallelizing a Planning and Scheduling Algorithm

    NASA Technical Reports Server (NTRS)

    Clement, Bradley J.; Estlin, Tara A.; Bornstein, Benjamin D.

    2011-01-01

    Space missions have a growing interest in putting multi-core processors onboard spacecraft. For many missions processing power significantly slows operations. We investigate how continual planning and scheduling algorithms can exploit multi-core processing and outline different potential design decisions for a parallelized planning architecture. This organization of choices and challenges helps us with an initial design for parallelizing the CASPER planning system for a mesh multi-core processor. This work extends that presented at another workshop with some preliminary results.

  17. Realization of planning design of mechanical manufacturing system by Petri net simulation model

    NASA Astrophysics Data System (ADS)

    Wu, Yanfang; Wan, Xin; Shi, Weixiang

    1991-09-01

    Planning design is to work out a more overall long-term plan. In order to guarantee a mechanical manufacturing system (MMS) designed to obtain maximum economical benefit, it is necessary to carry out a reasonable planning design for the system. First, some principles on planning design for MMS are introduced. Problems of production scheduling and their decision rules for computer simulation are presented. Realizable method of each production scheduling decision rule in Petri net model is discussed. Second, the solution of conflict rules for conflict problems during running Petri net is given. Third, based on the Petri net model of MMS which includes part flow and tool flow, according to the principle of minimum event time advance, a computer dynamic simulation of the Petri net model, that is, a computer dynamic simulation of MMS, is realized. Finally, the simulation program is applied to a simulation exmple, so the scheme of a planning design for MMS can be evaluated effectively.

  18. Formulation of consumables management models. Development approach for the mission planning processor working model

    NASA Technical Reports Server (NTRS)

    Connelly, L. C.

    1977-01-01

    The mission planning processor is a user oriented tool for consumables management and is part of the total consumables subsystem management concept. The approach to be used in developing a working model of the mission planning processor is documented. The approach includes top-down design, structured programming techniques, and application of NASA approved software development standards. This development approach: (1) promotes cost effective software development, (2) enhances the quality and reliability of the working model, (3) encourages the sharing of the working model through a standard approach, and (4) promotes portability of the working model to other computer systems.

  19. SU-E-T-43: A Methodology for Quality Control of IMPT Treatment Plan Based On VMAT Plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Jiang, S; Tianjin Medical University Cancer Institute and Hospital; Yang, Y

    Purpose: IMPT plan design is highly dependent on planner’s experiences. VMAT plan design is relatively mature and can even be automated. The quality of IMPT plan designed by in-experienced planner could be inferior to that of VMAT plan designed by experienced planner or automatic planning software. Here we introduce a method for designing IMPT plan based on VMAT plan to ensure the IMPT plan be superior to IMRT/VMAT plan for majority clinical scenario. Methods: To design a new IMPT plan, a VMAT plan is first generated either by experienced planner or by in-house developed automatic planning system. An in-house developedmore » tool is used to generate the dose volume constrains for the IMPT plan as plan template to Eclipse TPS. The beam angles for IMPT plan are selected based on the preferred angles in the VMAT plan. IMPT plan is designed by importing the plan objectives generated from VMAT plan. Majority thoracic IMPT plans are designed using this plan approach in our center. In this work, a thoracic IMPT plan under RTOG 1308 protocol is selected to demonstrate the effectiveness and efficiency of this approach. The dosimetric indices of IMPT are compared with VMAT plan. Results: The PTV D95, lung V20, MLD, mean heart dose, esophagus D1, cord D1 are 70Gy, 31%, 17.8Gy, 25.5Gy, 73Gy, 45Gy for IMPT plan and 65.3Gy, 34%, 21.6Gy, 35Gy, 74Gy, 48Gy for VMAT plan. For majority cases, the high dose region of the normal tissue which is in proximity of PTV is comparable between IMPT and VMAT plan. The low dose region of the IMPT plan is significantly better than VMAT plan. Conclusion: Using the knowledge gained in VMAT plan design can help efficiently and effectively design high quality IMPT plan. The quality of IMPT plan can be controlled to ensure the superiority of IMPT plan compared to VMAT/IMRT plan.« less

  20. Dr. John H. Hopps Jr. Defense Research Scholars Program

    DTIC Science & Technology

    2014-12-16

    Summer 2011) Post -Graduation Plans • Employed as a mechanical engineer at Allegion. • Applying to graduate programs in industrial design and mechanical...Summer 2010) • Multi-Layer Mirror Design for Ultra-Soft X-Rays, Ecole Polytechnique (Summer 2011) Post -Graduation Plans • Post Baccalaureate Research...the year off to work while others planned on strengthening their applications by broadening their research skills in post baccalaureate programs

  1. US Plans for the JEM-EUSO

    NASA Technical Reports Server (NTRS)

    Adams, James H.

    2007-01-01

    This viewgraph presentation reviews the planned United States work on the Extreme Universe Space Observatory (EUSO.) The EUSO is to be mounted to the JEM (Japanese Experiment Module). The plans areas for US participation are the Optics Investigations, Trigger Design and Event Reconstruction.

  2. ACHP | News

    Science.gov Websites

    Cultural Landscapes Action Plan; and Announcement of five new Preserve America Community designations by the Native American Traditional Cultural Landscapes Action Plan and how the ACHP is working with the

  3. An Introduction to the Transition to Work Simulator.

    ERIC Educational Resources Information Center

    Conroy, William G., Jr.

    The transition to work simulator (TWS) was developed as a policy tool for education and manpower planning. It was designed in anticipation of the Education Amendments of 1976 and the Youth Employment and Demonstration Projects Act of 1977 to facilitate comprehensive planning. TWS is a computerized simulation model of the stream of important…

  4. A preliminary model of work during initial examination and treatment planning appointments.

    PubMed

    Irwin, J Y; Torres-Urquidy, M H; Schleyer, T; Monaco, V

    2009-01-10

    Objective This study's objective was to formally describe the work process for charting and treatment planning in general dental practice to inform the design of a new clinical computing environment.Methods Using a process called contextual inquiry, researchers observed 23 comprehensive examination and treatment planning sessions during 14 visits to 12 general US dental offices. For each visit, field notes were analysed and reformulated as formalised models. Subsequently, each model type was consolidated across all offices and visits. Interruptions to the workflow, called breakdowns, were identified.Results Clinical work during dental examination and treatment planning appointments is a highly collaborative activity involving dentists, hygienists and assistants. Personnel with multiple overlapping roles complete complex multi-step tasks supported by a large and varied collection of equipment, artifacts and technology. Most of the breakdowns were related to technology which interrupted the workflow, caused rework and increased the number of steps in work processes.Conclusion Current dental software could be significantly improved with regard to its support for communication and collaboration, workflow, information design and presentation, information content, and data entry.

  5. STEM Teachers' Planned and Enacted Attempts at Implementing Engineering Design-Based Instruction

    ERIC Educational Resources Information Center

    Capobianco, Brenda M.; Rupp, Madeline

    2014-01-01

    This study investigates grades 5 and 6 science, technology, engineering, and mathematics (STEM) teachers' planned and actualized engineering design-based instruction, the instruments used to characterize their efforts, and the implications this work has for teachers' implementations of an integrated approach to STEM education.…

  6. Practical Suggestions for Family Planning Education.

    ERIC Educational Resources Information Center

    Health Services Administration (DHEW/PHS), Rockville, MD. Bureau of Community Health Services.

    This manual is designed to address some of the basic problems of those who work in family planning education, and is based on the recurring questions and concerns of participants in a nationwide series of DHEW-sponsored family planning education and communication workshops. The manual proceeds chronologically, dealing first with the planning of a…

  7. RBS Career Education. Evaluation Planning Manual. Education Is Going to Work.

    ERIC Educational Resources Information Center

    Kershner, Keith M.

    Designed for use with the Research for Better Schools career education program, this evaluation planning manual focuses on procedures and issues central to planning the evaluation of an educational program. Following a statement on the need for evaluation, nine sequential steps for evaluation planning are discussed. The first two steps, program…

  8. Job Design for Learning in Work Groups

    ERIC Educational Resources Information Center

    Lantz, Annika; Brav, Agneta

    2007-01-01

    Purpose--What is required of job design and production planning, if they are to result in a work group taking a self-starting approach and going beyond what is formally required of it? This paper aims to contribute to group research by testing a theoretical model of relations between job design on the one hand (captured as completeness, demand on…

  9. The Participation to The All Japan College of Technology Design Competition and The Trial of Art and Design Education

    NASA Astrophysics Data System (ADS)

    Kato, Kenji; Takeshita, Junji

    The works of Toyota national college of technology gets excellent result on structural design competition (bridge contest) of national college design competition. This paper reports planning and making process of these works. As increase strength of the structures, it is important point the determination of structural type by numerical analysis and test, and precision of production and idea of joining. Second, it reports the curriculum of special items connection with excellent works.

  10. Planning for Workforce Reductions: A Technical Assistance Guide for Employers.

    ERIC Educational Resources Information Center

    Balfe, Kevin

    This guide is designed to help employers plan work force reductions. It emphasizes positive collaboration with workers and the community to find new jobs for workers and maintain morale and productivity in the plant. The guide is divided into five chapters. The first chapter acquaints the reader with some of the benefits of work force reduction…

  11. Action Plan for Communicating and Marketing the Work and Family Life Program.

    ERIC Educational Resources Information Center

    West, James S.; Hunady, Ronald J.

    This information packet is designed to help Ohio's high school and middle/junior high school teachers develop a plan to communicate and market the state's work and family life program to various constituencies (students, parents, guidance counselors, school boards, and the general public). Discussed first are the rationale for and intended results…

  12. The space shuttle payload planning working groups: Executive summaries

    NASA Technical Reports Server (NTRS)

    1973-01-01

    The findings of a space shuttle payload planning group session are presented. The purpose of the workshop is: (1) to provide guidance for the design and development of the space shuttle and the spacelab and (2) to plan a space science and applications program for the 1980 time period. Individual groups were organized to cover the various space sciences, applications, technologies, and life sciences. Summaries of the reports submitted by the working groups are provided.

  13. Sample transportation management plans and templates.

    DOT National Transportation Integrated Search

    2010-08-01

    This Guide consisting of samples, templates, and tips is designed to help transportation agencies with the : development and implementation of their own Transportation Management Plans (TMPs). Understanding : the work zone impacts is critical to deve...

  14. The Promise of Collaboration

    ERIC Educational Resources Information Center

    Bauml, Michelle

    2016-01-01

    Whether a teacher loves it or dreads it, lesson planning is a crucial step in the teaching process. Done effectively, collaborative lesson planning--in which teachers work together to design lessons--leads to increased professional learning, higher job satisfaction for teachers, and better lesson plans. The process poses challenges for both…

  15. Career Survival: Strategic Job and Role Planning. Pfeiffer Career Series.

    ERIC Educational Resources Information Center

    Schein, Edgar H.

    This book was designed to help managers and employees to decipher the two crucial elements in work design and human resource planning: the role network that surrounds every position and the key stakeholders whose expectations define the essence of the job. It provides a structured process for analyzing one's own job as well as the jobs of…

  16. ALS rocket engine combustion devices design and demonstration

    NASA Technical Reports Server (NTRS)

    Arreguin, Steve

    1989-01-01

    Work performed during Phase one is summarized and the significant technical and programmatic accomplishments occurring during this period are documented. Besides a summary of the results, methodologies, trade studies, design, fabrication, and hardware conditions; the following are included: the evolving Maintainability Plan, Reliability Program Plan, Failure Summary and Analysis Report, and the Failure Mode and Effect Analysis.

  17. Validating the Electric Maze Task as a Measure of Planning

    ERIC Educational Resources Information Center

    Sheppard, Kelly W.; Cheatham, Carol L.

    2017-01-01

    The Electric Maze Task (EMT) is a novel planning task designed to allow flexible testing of planning abilities across a broad age range and to incorporate manipulations to test underlying planning abilities, such as working-memory and inhibitory control skills. The EMT was tested in a group of 63 typically developing 7- to 12-year-olds.…

  18. Status report, The Public Health and Planning 101 project: strengthening collaborations between the public health and planning professions.

    PubMed

    Mahendra, A; Vo, T; Einstoss, C; Weppler, J; Gillen, P; Ryan, L; Haley, K

    2017-01-01

    Land use planning is a complex field comprised of legislation, policies, processes and tools. A growing body of evidence supports the relationship between land use planning decisions, community design and health. The built environment has been shown to be associated with physical inactivity, obesity, cardiovascular disease, respiratory disease and mental illness. Consequently, there is a growing interest within public health to work with planners on land use planning initiatives such as official plans and transportation master plans. Two surveys were developed: one for public health professionals and the other for planning professionals (survey questions available upon request to the corresponding author). The surveys were pilot tested in two separate focus group sessions with public health and planning professionals. Focus group volunteers helped to validate the surveys by verifying survey questions, design and overall flow. In early 2012, 304 public health professionals and 301 planning professionals completed the two separate surveys, comprising the total survey respondents for each respective profession used to calculate proportions. The survey results represent a convenience sample and are not generalizable to the entire population of public health and planning professionals in Ontario. Results compare survey responses from both groups where appropriate. Most respondents worked either as public health staff (78%) or planners/senior planners (58%). A smaller percentage of public health and planning professionals worked either as managers (15% and 11%, respectively) or directors (5% and 9%, respectively). Health is associated with how communities are planned and built, and the services and resources provided within them. Inspired by the results of our survey and based on user feedback from the pilot tests, a free online training program entitled "Public Health and Planning 101: An Online Course for Public Health and Planning Professionals to Create Healthier Built Environments" was launched in 2016 by OPHA as a collaborative project with OPPI and PHAC. This course is designed to bridge the gaps between the two professions, as well as provide greater opportunities for developing collaborative partnerships to help create and foster healthy built environments.

  19. Faculty Planning, Development, and Evaluation System: Washtenaw Community College.

    ERIC Educational Resources Information Center

    Altieri, Guy; And Others

    Between 1989 and 1991, the Planning, Development and Evaluation (PDE) Committee of Washtenaw Community College (Michigan) designed a faculty assessment process focusing on professional development and academic planning. It is an approach in which all educators (faculty and administrators) work together, using the PDE system to continually define…

  20. Guidelines for developing transportation management plans in Virginia.

    DOT National Transportation Integrated Search

    2005-01-01

    A transportation management plan (TMP) is a comprehensive program of traffic control, communication, operation, and demand management strategies designed to maintain acceptable levels of traffic flow in work zones. A systematic procedure and/or check...

  1. Robust network design for multispecies conservation

    Treesearch

    Ronan Le Bras; Bistra Dilkina; Yexiang Xue; Carla P. Gomes; Kevin S. McKelvey; Michael K. Schwartz; Claire A. Montgomery

    2013-01-01

    Our work is motivated by an important network design application in computational sustainability concerning wildlife conservation. In the face of human development and climate change, it is important that conservation plans for protecting landscape connectivity exhibit certain level of robustness. While previous work has focused on conservation strategies that result...

  2. Designing CBE for Continuing Professional Education.

    ERIC Educational Resources Information Center

    Rees, Keith

    Deakin Australia (DA) CBE (Continuing Business Education) programs are designed for use in conjunction with print and audio materials which are distributed as distance learning packages to business studies graduates working or planning to work as accountants, who are enrolled in the professional licensing program run by the Australian Society of…

  3. Toward a research and action agenda on urban planning/design and health equity in cities in low and middle-income countries.

    PubMed

    Smit, Warren; Hancock, Trevor; Kumaresen, Jacob; Santos-Burgoa, Carlos; Sánchez-Kobashi Meneses, Raúl; Friel, Sharon

    2011-10-01

    The importance of reestablishing the link between urban planning and public health has been recognized in recent decades; this paper focuses on the relationship between urban planning/design and health equity, especially in cities in low and middle-income countries (LMICs). The physical urban environment can be shaped through various planning and design processes including urban planning, urban design, landscape architecture, infrastructure design, architecture, and transport planning. The resultant urban environment has important impacts on the health of the people who live and work there. Urban planning and design processes can also affect health equity through shaping the extent to which the physical urban environments of different parts of cities facilitate the availability of adequate housing and basic infrastructure, equitable access to the other benefits of urban life, a safe living environment, a healthy natural environment, food security and healthy nutrition, and an urban environment conducive to outdoor physical activity. A new research and action agenda for the urban environment and health equity in LMICs should consist of four main components. We need to better understand intra-urban health inequities in LMICs; we need to better understand how changes in the built environment in LMICs affect health equity; we need to explore ways of successfully planning, designing, and implementing improved health/health equity; and we need to develop evidence-based recommendations for healthy urban planning/design in LMICs.

  4. Planning for Universal Design for Learning in the Early Childhood Inclusion Classroom: A Case Study

    ERIC Educational Resources Information Center

    Stone, Jennifer

    2013-01-01

    The majority of children with exceptionalities aged 3-5 are being served in general education settings. Teachers working in these inclusion classrooms must have the ability and knowledge to work with all students under their care. The purpose of this study was to determine how teachers in early childhood inclusion classrooms plan to incorporate…

  5. Report of Advisory Group on Assessing Means for Strengthening the Role of Labor in Education and Work Planning.

    ERIC Educational Resources Information Center

    Northwest Regional Educational Lab., Portland, OR.

    As a part of research designed to determine how labor leaders perceive the current relationship between labor and education and to identify activities that could promote greater collaboration in education and work, an advisory committee composed of labor leaders met to analyze labor's role in planning educational activities. Central issues for the…

  6. Army Corps of Engineers: Better Guidance Could Improve Corps’ Information on Water Resources Projects Undertaken by Nonfederal Sponsors

    DTIC Science & Technology

    2016-12-01

    Nonfederal Sponsors Why GAO Did This Study Through its Civil Works program, the Corps designs , constructs, and maintains federal water resources...Public Works United States Senate Dear Mr. Chairman: The U.S. Army Corps of Engineers (Corps) is the world’s largest public engineering, design ...its Civil Works Program, in general, the Corps plans, designs , constructs, operates, and maintains a wide range of water resources projects. Congress

  7. Correlated Curriculum Program: An Experimental Program. Science Level 1 (9A, 9B, 10A).

    ERIC Educational Resources Information Center

    Loebl, Stanley, Ed.; And Others

    The unit plans in Correlated Science 1 are intended to be of use to the teacher in both lesson and team planning. The course in science was designed for optimum correlation with the work done in business, health, and industrial careers. Behavioral objectives, class routines, time allotments, student evaluation, and the design of the manual are…

  8. 40 CFR Appendix B to Subpart I of... - Allowance for Facilities Planning and Design

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 1 2012-07-01 2012-07-01 false Allowance for Facilities Planning and Design B Appendix B to Subpart I of Part 35 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GRANTS AND OTHER FEDERAL ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works Pt. 35, Subpt. I, App. B Appendix B to...

  9. Mastering the Maestro: The Effective Maestro Asks Writers, Photographers, and Designers to Trade Places with Readers as They Plan.

    ERIC Educational Resources Information Center

    Cripe, Dennis

    1998-01-01

    Considers two very different fictional high school newspaper editorships to see how the "maestro" process works. Notes that the process is a management technique similar to brainstorming but in which one person keeps the planning meeting focused. Suggests that the effective maestro asks writers, photographers, and designers to trade places with…

  10. The Planning of In-Service Workshops: A Seminar (Atlanta, Feb. 14-17, 1971).

    ERIC Educational Resources Information Center

    Southern Regional Education Board, Atlanta, GA.

    This document is a summation of a workshop designed to be a planning experience for ABE training personnel. It also contains a sampling of model training designs developed by the participants for inservice work. The object of the seminar was to provide an overview of relevant techniques and procedures for developing and implementing short-term…

  11. Field Implementation Plan for the In-Situ Bioremediation Treatability Study at the Technical Area-V Groundwater Area of Concern

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Li, Jun

    This Field Implementation Plan (FIP) was prepared by Sandia National Laboratories, New Mexico (SNL/NM) and provides instruction on conducting a series of in-situ bioremediation (ISB) tests as described in the Revised Treatability Study Work Plan for In-Situ Bioremediation at the Technical Area-V Groundwater Area of Concern, referred to as the Revised Work Plan in this FIP. The Treatability Study is designed to gravity inject an electron-donor substrate and bioaugmentation bacteria into groundwater via three injection wells to perform bioremediation of the constituents of concern (COCs), nitrate and trichloroethene (TCE), in the regions with the highest concentrations at the Technical Area-Vmore » Groundwater (TAVG) Area of Concern (AOC). The Treatability Study will evaluate the effectiveness of bioremediation solution delivery and COC treatment over time. This FIP is designed for SNL/NM work planning and management. It is not intended to be submitted for regulator’s approval. The technical details presented in this FIP are subject to change based on field conditions, availability of equipment and materials, feasibility, and inputs from Sandia personnel and Aboveground Injection System contractor.« less

  12. 40 CFR 35.2005 - Definitions.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... economic investigations or studies, surveys, designs, plans, working drawings, specifications, procedures... design-type projects within the scope of the practice of architecture or professional engineering as... as designed. (10) Collector sewer. The common lateral sewers, within a publicly owned treatment...

  13. 40 CFR 35.2005 - Definitions.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... economic investigations or studies, surveys, designs, plans, working drawings, specifications, procedures... design-type projects within the scope of the practice of architecture or professional engineering as... as designed. (10) Collector sewer. The common lateral sewers, within a publicly owned treatment...

  14. Theme II Joint Work Plan -2017 Collaboration and Knowledge Sharing on Large-scale Demonstration Projects

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Zhang, Xiaoliang; Stauffer, Philip H.

    This effort is designed to expedite learnings from existing and planned large demonstration projects and their associated research through effective knowledge sharing among participants in the US and China.

  15. 20 CFR 661.440 - What limitations apply to the State's Workforce Flexibility Plan authority under WIA?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... TRAINING ADMINISTRATION, DEPARTMENT OF LABOR STATEWIDE AND LOCAL GOVERNANCE OF THE WORKFORCE INVESTMENT... flexibility plan. Once approved, a State's work-flex designation is conditioned on the State demonstrating it...

  16. Integrating operation design into infrastructure planning to foster robustness of planned water systems

    NASA Astrophysics Data System (ADS)

    Bertoni, Federica; Giuliani, Matteo; Castelletti, Andrea

    2017-04-01

    Over the past years, many studies have looked at the planning and management of water infrastructure systems as two separate problems, where the dynamic component (i.e., operations) is considered only after the static problem (i.e., planning) has been resolved. Most recent works have started to investigate planning and management as two strictly interconnected faces of the same problem, where the former is solved jointly with the latter in an integrated framework. This brings advantages to multi-purpose water reservoir systems, where several optimal operating strategies exist and similar system designs might perform differently on the long term depending on the considered short-term operating tradeoff. An operationally robust design will be therefore one performing well across multiple feasible tradeoff operating policies. This work aims at studying the interaction between short-term operating strategies and their impacts on long-term structural decisions, when long-lived infrastructures with complex ecological impacts and multi-sectoral demands to satisfy (i.e., reservoirs) are considered. A parametric reinforcement learning approach is adopted for nesting optimization and control yielding to both optimal reservoir design and optimal operational policies for water reservoir systems. The method is demonstrated on a synthetic reservoir that must be designed and operated for ensuring reliable water supply to downstream users. At first, the optimal design capacity derived is compared with the 'no-fail storage' computed through Rippl, a capacity design function that returns the minimum storage needed to satisfy specified water demands without allowing supply shortfall. Then, the optimal reservoir volume is used to simulate the simplified case study under other operating objectives than water supply, in order to assess whether and how the system performance changes. The more robust the infrastructural design, the smaller the difference between the performances of different operating strategies.

  17. Solar Schematic

    NASA Technical Reports Server (NTRS)

    1979-01-01

    The home shown at right is specially designed to accommodate solar heating units; it has roof planes in four directions, allowing placement of solar collectors for best exposure to the sun. Plans (bottom) and complete working blueprints for the solar-heated house are being marketed by Home Building Plan Service, Portland, Oregon. The company also offers an inexpensive schematic (center) showing how a homeowner only moderately skilled in the use of tools can build his own solar energy system, applicable to new or existing structures. The schematic is based upon the design of a low-cost solar home heating system built and tested by NASA's Langley Research Center; used to supplement a warm-air heating system, it can save the homeowner about 40 percent of his annual heating bill for a modest investment in materials and components. Home Building Plan Service saved considerable research time by obtaining a NASA technical report which details the Langley work. The resulting schematic includes construction plans and simplified explanations of solar heat collection, collectors and other components, passive heat factors, domestic hot water supply and how to work with local heating engineers.

  18. Planning for College Success

    ERIC Educational Resources Information Center

    PEPNet, 2009

    2009-01-01

    "Planning for College Success" (PCS) is a curriculum model designed by Sharon Downs, M.S., for a course intended to assist deaf and hard of hearing students during their initial introduction to college life. This program allows students to work one-on-one with a counselor to plan for their college success. The program includes short-term goals and…

  19. Curriculum Planning and the Concept of Participation in the Reggio Emilia Pedagogical Approach

    ERIC Educational Resources Information Center

    Hocevar, Andreja; Šebart, Mojca Kovac; Štefanc, Damijan

    2013-01-01

    The article analyses two defining assumptions about the Reggio Emilia (RE) approach: the absence of a planned curriculum designed in advance as a basis for educational work and children's participation in preschools. The authors demonstrate that different approaches to planning preschool education have advantages and disadvantages, which we cannot…

  20. Planning crops and developing propagation protocols [Chapter 3

    Treesearch

    Douglass F. Jacobs; Kim M. Wilkinson

    2009-01-01

    Crop planning is an important but often neglected aspect of successful nursery management. Crop planning enables proper scheduling of the necessary time, materials, labor, and space to produce crops. Many painstaking details, such as the careful design of nursery facilities; working with clients; collecting and propagating seeds and cuttings; and making improvements in...

  1. 4D modeling in high-rise construction

    NASA Astrophysics Data System (ADS)

    Balakina, Anastasiya; Simankina, Tatyana; Lukinov, Vitaly

    2018-03-01

    High-rise construction is a complex construction process, requiring the use of more perfected and sophisticated tools for design, planning and construction management. The use of BIM-technologies allows minimizing the risks associated with design errors and errors that occur during construction. This article discusses a visual planning method using the 4D model, which allows the project team to create an accurate and complete construction plan, which is much more difficult to achieve with the help of traditional planning methods. The use of the 4D model in the construction of a 70-story building allowed to detect spatial and temporal errors before the start of construction work. In addition to identifying design errors, 4D modeling has allowed to optimize the construction, as follows: to optimize the operation of cranes, the placement of building structures and materials at various stages of construction, to optimize the organization of work performance, as well as to monitor the activities related to the preparation of the construction site for compliance with labor protection and safety requirements, which resulted in saving money and time.

  2. A Simulation Analysis of an Automated Identification Processor for the Tactical Air Control System.

    DTIC Science & Technology

    1986-06-01

    available at the work station for the M&I operators to identify aircraft. Some data is provided via the console such as the IFF/SIF and the airspace control...factors led to the development of efficient work stations for the functional positions in the air defense mission. Experimental Design Experiments are...techniques that helped keep the thesis work "on track"! The Research Design The research plan or design of this thesis effort is not unique. In fact

  3. 40 CFR 49.154 - Permit application requirements.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ..., production rates and operating schedules. (vii) Identification and description of any existing air pollution... pollution prevention techniques, air pollution control devices, design standards, equipment standards, work... ASSISTANCE INDIAN COUNTRY: AIR QUALITY PLANNING AND MANAGEMENT General Federal Implementation Plan Provisions...

  4. 40 CFR 49.154 - Permit application requirements.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ..., production rates and operating schedules. (vii) Identification and description of any existing air pollution... pollution prevention techniques, air pollution control devices, design standards, equipment standards, work... ASSISTANCE INDIAN COUNTRY: AIR QUALITY PLANNING AND MANAGEMENT General Federal Implementation Plan Provisions...

  5. 40 CFR 49.154 - Permit application requirements.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ..., production rates and operating schedules. (vii) Identification and description of any existing air pollution... pollution prevention techniques, air pollution control devices, design standards, equipment standards, work... ASSISTANCE INDIAN COUNTRY: AIR QUALITY PLANNING AND MANAGEMENT General Federal Implementation Plan Provisions...

  6. 40 CFR 49.154 - Permit application requirements.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ..., production rates and operating schedules. (vii) Identification and description of any existing air pollution... pollution prevention techniques, air pollution control devices, design standards, equipment standards, work... ASSISTANCE INDIAN COUNTRY: AIR QUALITY PLANNING AND MANAGEMENT General Federal Implementation Plan Provisions...

  7. Veterinary Disaster Response at the National Level

    DTIC Science & Technology

    2009-04-10

    Plans for Pet Disaster Needs, http://www.fema.gov/ plan /prepare/animals.shtm (accessed February 12, 2009). 99 Big Paw Designs , National Pet Holidays...Knebel, RN, DNSc USPHS, OPEO, DHHS U.S. Public Health Service Deputy Director, Preparedness and Planning 11. SPONSOR/MONITOR’S REPORT Office of...Medical Association; and establishing a working group to plan how to accomplish these recommendations and improve federal agency interaction. U15

  8. Working Definitions of Terms for the Bilingual Instructional Features Study. Planning Paper 1. Bilingual Instructional Features Planning Study.

    ERIC Educational Resources Information Center

    Nieves-Squires, Sarah; Goodrich, Robert L.

    This report is one of five submitted as products of a "Study Designed to Assist Planning of Research on Significant Instructional Features in Bilingual Education Programs." The reports are intended to assist the National Institute of Education (NIE) in its plans for a major new research study in bilingual education. The present volume is…

  9. Nez Perce Tribal Hatchery Project : Combined-Planning & Design and Operations & Maintenance Reports, 2000 Annual Report.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Larson, Roy Edward; Walker, Grant W.

    2002-12-31

    Nez Perce Tribal Hatchery (NPTH) Year-2000 Combined Maintenance and Operations (O&M) and Planning and Design (P&D) contract is hereby completed based on this annual report patterned after the Statement of Work (SOW) for the project as contracted with Bonneville Power Administration. Primary project activities focused on completion of the Northwest Power Planning Council Step-3 process that: (1) Accepted final design, (2) Authorized a capital construction amount of $16,050,000, and (3) Authorized contractor selection, and (4) Provided construction site dedication, and (5) Implemented construction activities over an anticipated 2-year period of July 2000 through October 2002.

  10. Plan for the design, development, and implementation, and operation of the National Water Information System

    USGS Publications Warehouse

    Edwards, M.D.

    1987-01-01

    The Water Resources Division of the U.S. Geological Survey is developing a National Water Information System (NWIS) that will integrate and replace its existing water data and information systems of the National Water Data Storage and Retrieval System, National Water Data Exchange, National Water-Use Information, and Water Resources Scientific Information Center programs. It will be a distributed data system operated as part of the Division 's Distributed Information System, which is a network of computers linked together through a national telecommunication network known as GEONET. The NWIS is being developed as a series of prototypes that will be integrated as they are completed to allow the development and implementation of the system in a phased manner. It also is being developed in a distributed manner using personnel who work under the coordination of a central NWIS Project Office. Work on the development of the NWIS began in 1983 and it is scheduled for completion in 1990. This document presents an overall plan for the design, development, implementation, and operation of the system. Detailed discussions are presented on each of these phases of the NWIS life cycle. The planning, quality assurance, and configuration management phases of the life cycle also are discussed. The plan is intended to be a working document for use by NWIS management and participants in its design and development and to assist offices of the Division in planning and preparing for installation and operation of the system. (Author 's abstract)

  11. 40 CFR 35.2104 - Funding and other considerations.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... maintenance of the treatment works throughout the applicant's jurisdiction including the ability to comply... ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works § 35.2104 Funding and other... in connection with facilities planning or design work on a wastewater treatment works project. (4...

  12. 40 CFR 35.2104 - Funding and other considerations.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works § 35.2104 Funding and other... maintenance of the treatment works throughout the applicant's jurisdiction including the ability to comply... in connection with facilities planning or design work on a wastewater treatment works project. (4...

  13. Accommodating Change: A Case Study in Planning a Sustainable New Business School Building.

    ERIC Educational Resources Information Center

    Taylor, Lee

    2002-01-01

    Provides a case study of the planning and design of a new building for the Open University Business School. Goals included an energy-efficient building that would break the paradigm of traditional university working methods. (EV)

  14. Preservation Planning Program. Study Report. Iowa State University Library. Final Report.

    ERIC Educational Resources Information Center

    Galejs, John; And Others

    This final report is a product of a Preservation Planning Program (PPP) self-study conducted by the Iowa State University, working with the Association of Research Libraries' (ARL) Office of Management Studies. The PPP is designed to put self-help tools into the hands of library staff responsible for developing plans and procedures for preserving…

  15. A Work Force for Environment and Energy. A Master Plan for Environmental/Energy Higher Education in Illinois.

    ERIC Educational Resources Information Center

    Illinois Inst. for Environmental Quality, Chicago.

    This master plan for environmental and energy higher education in Illinois is a direct result of a mandate from the Illinois General Assembly. To prepare students to confront our nation's environmental problems, each university will submit a management and development plan, designed to preserve existing environmental values and provide…

  16. FY 1987 current fiscal year work plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    This Current Year Work Plan presents a detailed description of the activities to be performed by the Joint Integration Office during FY87. It breaks down the activities into two major work areas: Program Management and Program Analysis. Program Management is performed by the JIO by providing technical planning and guidance for the development of advanced TRU waste management capabilities. This includes equipment/facility design, engineering, construction, and operations. These functions are integrated to allow transition from interim storage to final disposition. JIO tasks include program requirements identification, long-range technical planning, budget development, program planning document preparation, task guidance, task monitoring, informationmore » gathering and task reporting to DOE, interfacing with other agencies and DOE lead programs, integrating public involvement with program efforts, and preparation of program status reports for DOE. Program Analysis is performed by the JIO to support identification and assessment of alternatives, and development of long-term TRU waste program capabilities. This work plan includes: system analyses, requirements analyses, interim and procedure development, legislative and regulatory analyses, dispatch and traffic analyses, and data bases.« less

  17. Control And Containment Design Report

    EPA Pesticide Factsheets

    his work plan (571-pages) is called the “SWMU-3-1 and 3-4 Control and Containment Design Report” was written to be in compliance with new FEMA requirements that the design must not create any positive change in the 100 year flood elevation.

  18. Planning and Doing in Professional Teaching Practice. A Study with Early Childhood Education Teachers Working with ICT (3-6 Years)

    ERIC Educational Resources Information Center

    Ramírez, Elena; Clemente, María; Recamán, Adriana; Martín-Domínguez, Jorge; Rodríguez, Inés

    2017-01-01

    Planning is one of the professional tasks teachers have to carry out before their direct action in the classrooms. This planning is closely interrelated to the way teachers teach. The question about how and why teachers reach their decisions in their pre-class planning is a classical one in the research into curricular design and development. The…

  19. Characteristics and Determinants of Teacher-Designed Pay for Performance Plans: Evidence from Texas' Governor's Educator Excellence Grant (GEEG) Program. Working Paper 2008-26

    ERIC Educational Resources Information Center

    Taylor, Lori L.; Springer, Matthew G.; Ehlert, Mark

    2008-01-01

    This study describes the teacher pay for performance plans designed and implemented by the public schools participating in the Governor's Educator Excellence Grant (GEEG) program in Texas. GEEG is a federally funded, incentive pay program that awarded non-competitive grants, ranging from $60,000 to $220,000 each year for three years, to 99 Texas…

  20. Work zone and operation enhancements.

    DOT National Transportation Integrated Search

    2010-02-01

    Oregon Department of Transportation contractors are required to implement Traffic Control Plans (TCPs) to protect and direct traffic through work zones. The design and implementation of TCPs have shown variation from project-to-project across the Sta...

  1. Work environment perceptions following relocation to open-plan offices: A twelve-month longitudinal study.

    PubMed

    Bergström, Jessica; Miller, Michael; Horneij, Eva

    2015-01-01

    A workplace's design can have various positive or negative effects on the employees and since the 1970s the advantages and disadvantages of open-plan offices have been discussed. The aim of this study was to investigate perceived health, work environment and self-estimated productivity one month before and at three, six and twelve months after relocation from individual offices to an open-plan office environment. Employees from three departments within the same company group and who worked with relatively similar tasks and who were planned to be relocated from private offices to open-plan offices were invited to participate. Questionnaires comprising items from The Salutogenic Health Indicator Scale, The Work Experience Measurement Scale, the questionnaire by Brennan et al. about perceived performance and one question from the Work Ability Index were sent to participants one month before relocation (baseline) to open-plan offices and then at three, six and twelve months after relocation. At baseline, 82 questionnaires were sent out. The response rate was 85%. At the follow-ups 77-79 questionnaires were sent out and the response-rate was 70%-81%. At follow-ups, perceived health, job satisfaction and performance had generally deteriorated. The results of the study indicate that employees' perception of health, work environment and performance decreased during a 12 month period following relocation from individual offices to open-plan offices.

  2. 33 CFR 209.345 - Water resource policies and authorities.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    .... Reimbursement for Advance Non-Federal Participation in Civil Works Projects (a) Purpose. This regulation gives... regulation applies to all field operating agencies having Civil Works responsibilities. (c) References. (1... develop the design memorandum, engineering plans, and specifications for the work it proposes to undertake...

  3. Social Work Assessment Notes: A Comprehensive Outcomes-Based Hospice Documentation System.

    PubMed

    Hansen, Angela Gregory; Martin, Ellen; Jones, Barbara L; Pomeroy, Elizabeth C

    2015-08-01

    This article describes the development of an integrated psychosocial patient and caregiver assessment and plan of care for hospice social work documentation. A team of hospice social workers developed the Social Work Assessment Notes as a quality improvement project in collaboration with the information technology department. Using the Social Work Assessment Tool as an organizing framework, this comprehensive hospice social work documentation system is designed to integrate assessment, planning, and outcomes measurement. The system was developed to guide the assessment of patients' and caregivers' needs related to end-of-life psychosocial issues, to facilitate collaborative care plan development, and to measure patient- and family-centered outcomes. Goals established with the patient and the caregiver are documented in the plan of care and become the foundation for patient-centered, strengths-based interventions. Likert scales are used to assign numerical severity levels for identified issues and progress made toward goals and to track the outcome of social work interventions across nine psychosocial constructs. The documentation system was developed for use in an electronic health record but can be used for paper charting. Future plans include automated aggregate outcomes measurement to identify the most effective interventions and best practices in end-of-life care.

  4. CAD/CAM approach to improving industry productivity gathers momentum

    NASA Technical Reports Server (NTRS)

    Fulton, R. E.

    1982-01-01

    Recent results and planning for the NASA/industry Integrated Programs for Aerospace-Vehicle Design (IPAD) program for improving productivity with CAD/CAM methods are outlined. The industrial group work is being mainly done by Boeing, and progress has been made in defining the designer work environment, developing requirements and a preliminary design for a future CAD/CAM system, and developing CAD/CAM technology. The work environment was defined by conducting a detailed study of a reference design process, and key software elements for a CAD/CAM system have been defined, specifically for interactive design or experiment control processes. Further work is proceeding on executive, data management, geometry and graphics, and general utility software, and dynamic aspects of the programs being developed are outlined

  5. EPAS: A System that Works

    ERIC Educational Resources Information Center

    ACT, Inc., 2006

    2006-01-01

    ACT's Educational Planning and Assessment System (EPAS[R]) is designed to guide and support schools, districts, and states in their efforts to improve students' readiness for life after high school. EPAS provides a longitudinal approach to educational and career planning, assessment, instructional support, and evaluation. EPAS components are…

  6. 40 CFR 35.2214 - Grantee responsibilities.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... responsibilities. (a) The grantee shall complete the project in accordance with the grant agreement including: The facilities plan that establishes the need for the project; the design drawings and specifications; the plan... treatment works; the project schedule; and all other applicable regulations. The grantee shall maintain and...

  7. Designing and Adapting Tasks in Lesson Planning: A Critical Process of Lesson Study

    ERIC Educational Resources Information Center

    Fujii, Toshiakira

    2016-01-01

    There is no doubt that a lesson plan is a necessary product of Lesson Study. However, the collaborative work among teachers that goes into creating that lesson plan is largely under-appreciated by non-Japanese adopters of Lesson Study, possibly because the effort involved is invisible to outsiders, with our attention going to its most visible…

  8. Estate Planning for Forest Landowners What will Become of Your Timberland?

    Treesearch

    Harry L. Haney; William C. Siegel

    1993-01-01

    This book has been written to assist nonindustrial private landowners in addressing the considerations enumerated above. It is designed to provide a working knowledge of the Federal estate and gift tax law as it relates to estate planning for timberland owners. The unique character of timber assets is addressed in terms of the estate planning goals of a woodland owner...

  9. Do You See What I See: District Designs Learning Plan to Develop a Clear Vision of Effective Instruction

    ERIC Educational Resources Information Center

    Psencik, Kay; Cummings, C. Todd; Gerardot, Larry

    2015-01-01

    This article describes a professional learning plan created in the Fort Wayne Community Schools (Indiana, USA) for principals working and learning together on the RISE Indiana Teacher Effectiveness Rubric. This training plan ensures that principals are observing instructional practice in the same way and in agreement with the district's instrument…

  10. Long Range Facilities Planning and Design Implementation for Students with Disabilities: A Guide for New Jersey School Districts

    ERIC Educational Resources Information Center

    Lowenkron, Ruth; Ponessa, Joan

    2005-01-01

    The long range facilities planning (LRFP) process presents a wonderful opportunity for New Jersey's school districts to re-examine and strengthen their long term planning for educational adequacy in 21st century school facilities. It provides an opportunity for districts to work closely with the special education community to ensure that New…

  11. Planning ideology and geographic thought in the early twentieth century: Charles Whitnall's progressive era park designs for socialist Milwaukee.

    PubMed

    Platt, Lorne A

    2010-01-01

    As Milwaukee’s chief park planner in the early to mid-twentieth century, Charles Whitnall responded to the various underlying ideologies of the period within which he worked. His preference for parks was a political and physical response to and remedy for the industrialized and heavily congested city he called home. By examining the Progressive Era discourse associated with planning, this article situates Whitnall’s work within the political, aesthetic, and environmental contexts of geographic thought that influenced his plans for Milwaukee. In promoting a physical awareness associated with the natural features of the region and responding to the sociopolitical framework of contemporaries such as Ebenezer Howard, Whitnall incorporated a sense of compassion within his planning. He responded to the preexisting beer gardens of Pabst and Schlitz, as well as Olmsted-designed park spaces, by advocating for decentralization as part of a broader socialist agenda that had swept through Milwaukee during the early 1900s.

  12. Inverse-optimized 3D conformal planning: Minimizing complexity while achieving equivalence with beamlet IMRT in multiple clinical sites

    PubMed Central

    Fraass, Benedick A.; Steers, Jennifer M.; Matuszak, Martha M.; McShan, Daniel L.

    2012-01-01

    Purpose: Inverse planned intensity modulated radiation therapy (IMRT) has helped many centers implement highly conformal treatment planning with beamlet-based techniques. The many comparisons between IMRT and 3D conformal (3DCRT) plans, however, have been limited because most 3DCRT plans are forward-planned while IMRT plans utilize inverse planning, meaning both optimization and delivery techniques are different. This work avoids that problem by comparing 3D plans generated with a unique inverse planning method for 3DCRT called inverse-optimized 3D (IO-3D) conformal planning. Since IO-3D and the beamlet IMRT to which it is compared use the same optimization techniques, cost functions, and plan evaluation tools, direct comparisons between IMRT and simple, optimized IO-3D plans are possible. Though IO-3D has some similarity to direct aperture optimization (DAO), since it directly optimizes the apertures used, IO-3D is specifically designed for 3DCRT fields (i.e., 1–2 apertures per beam) rather than starting with IMRT-like modulation and then optimizing aperture shapes. The two algorithms are very different in design, implementation, and use. The goals of this work include using IO-3D to evaluate how close simple but optimized IO-3D plans come to nonconstrained beamlet IMRT, showing that optimization, rather than modulation, may be the most important aspect of IMRT (for some sites). Methods: The IO-3D dose calculation and optimization functionality is integrated in the in-house 3D planning/optimization system. New features include random point dose calculation distributions, costlet and cost function capabilities, fast dose volume histogram (DVH) and plan evaluation tools, optimization search strategies designed for IO-3D, and an improved, reimplemented edge/octree calculation algorithm. The IO-3D optimization, in distinction to DAO, is designed to optimize 3D conformal plans (one to two segments per beam) and optimizes MLC segment shapes and weights with various user-controllable search strategies which optimize plans without beamlet or pencil beam approximations. IO-3D allows comparisons of beamlet, multisegment, and conformal plans optimized using the same cost functions, dose points, and plan evaluation metrics, so quantitative comparisons are straightforward. Here, comparisons of IO-3D and beamlet IMRT techniques are presented for breast, brain, liver, and lung plans. Results: IO-3D achieves high quality results comparable to beamlet IMRT, for many situations. Though the IO-3D plans have many fewer degrees of freedom for the optimization, this work finds that IO-3D plans with only one to two segments per beam are dosimetrically equivalent (or nearly so) to the beamlet IMRT plans, for several sites. IO-3D also reduces plan complexity significantly. Here, monitor units per fraction (MU/Fx) for IO-3D plans were 22%–68% less than that for the 1 cm × 1 cm beamlet IMRT plans and 72%–84% than the 0.5 cm × 0.5 cm beamlet IMRT plans. Conclusions: The unique IO-3D algorithm illustrates that inverse planning can achieve high quality 3D conformal plans equivalent (or nearly so) to unconstrained beamlet IMRT plans, for many sites. IO-3D thus provides the potential to optimize flat or few-segment 3DCRT plans, creating less complex optimized plans which are efficient and simple to deliver. The less complex IO-3D plans have operational advantages for scenarios including adaptive replanning, cases with interfraction and intrafraction motion, and pediatric patients. PMID:22755717

  13. NASA Supportability Engineering Implementation Utilizing DoD Practices and Processes

    NASA Technical Reports Server (NTRS)

    Smith, David A.; Smith, John V.

    2010-01-01

    The Ares I design and development program made the determination early in the System Design Review Phase to utilize DoD ILS and LSA approach for supportability engineering as an integral part of the system engineering process. This paper is to provide a review of the overall approach to design Ares-I with an emphasis on a more affordable, supportable, and sustainable launch vehicle. Discussions will include the requirements development, design influence, support concept alternatives, ILS and LSA planning, Logistics support analyses/trades performed, LSA tailoring for NASA Ares Program, support system infrastructure identification, ILS Design Review documentation, Working Group coordination, and overall ILS implementation. At the outset, the Ares I Project initiated the development of the Integrated Logistics Support Plan (ILSP) and a Logistics Support Analysis process to provide a path forward for the management of the Ares-I ILS program and supportability analysis activities. The ILSP provide the initial planning and coordination between the Ares-I Project Elements and Ground Operation Project. The LSA process provided a system engineering approach in the development of the Ares-I supportability requirements; influence the design for supportability and development of alternative support concepts that satisfies the program operability requirements. The LSA planning and analysis results are documented in the Logistics Support Analysis Report. This document was required during the Ares-I System Design Review (SDR) and Preliminary Design Review (PDR) review cycles. To help coordinate the LSA process across the Ares-I project and between programs, the LSA Report is updated and released quarterly. A System Requirement Analysis was performed to determine the supportability requirements and technical performance measurements (TPMs). Two working groups were established to provide support in the management and implement the Ares-I ILS program, the Integrated Logistics Support Working Group (ILSWG) and the Logistics Support Analysis Record Working Group (LSARWG). The Ares I ILSWG is established to assess the requirements and conduct, evaluate analyses and trade studies associated with acquisition logistic and supportability processes and to resolve Ares I integrated logistics and supportability issues. It established a strategic collaborative alliance for coordination of Logistics Support Analysis activates in support of the integrated Ares I vehicle design and development of logistics support infrastructure. A Joint Ares I - Orion LSAR Working Group was established to: 1) Guide the development of Ares-I and Orion LSAR data and serve as a model for future Constellation programs, 2) Develop rules and assumptions that will apply across the Constellation program with regards to the program's LSAR development, and 3) Maintain the Constellation LSAR Style Guide.

  14. Getting past first base: Going all the way with Cognitive Work Analysis.

    PubMed

    McIlroy, Rich C; Stanton, Neville A

    2011-01-01

    This paper reports the application of Cognitive Work Analysis (CWA) to the problem of communications planning in military aviation. Applications of CWA rarely get beyond the first one or two phases; this paper presents an analysis in which all five phases have been completed. The method offers a formative description of the system, defining the set of boundaries and constraints that shape system activity in terms of work domain, recurring activities, decision making, social organisation and worker competency requirements. It is an analysis that is well suited to environments in which the occurrence of unanticipated events can have serious implications for both safety and productivity. Communications planning in military aviation is such an environment. The outputs of the analysis provided an extensive and exhaustive description of the system, highlighting the uneven spread of activity, across actors involved in communications planning and across the situations in which planning can occur. In addition, a new method for informing worker competency requirements based on abstract functions rather than specific decision steps is proposed and discussed in terms of job design, interface design, and person specification. Copyright © 2010 Elsevier Ltd and The Ergonomics Society. All rights reserved.

  15. The Teachers' Views on the Significance of the Design and Craft Teaching in Finland

    ERIC Educational Resources Information Center

    Ronkko, Marja-Leena; Mommo, Sanna; Aerila, Juli-Anna

    2016-01-01

    The Finnish curriculum for crafts emphasises the creative problem-solving skills of the student, the completion of different design tasks and the implementation of designs, while seeking to nurture the student's self-esteem. Furthermore, students should draw up the designs for their artefacts, plan their work, and also develop designs when needed.…

  16. The Annual Report of the National Shipbuilding Research Program (The Naval Shipbuilding Research Program)

    DTIC Science & Technology

    1986-08-29

    Abrasives Work Planning for Shipyard SP&C Training Overcoating of Zinc Primers Citric Acid Cleaning - Phase II - Waterborne Coatings Economics of...members workout organizational problems with minimum government involvement a set of strong, committed, and sometimes fiercely independent panels and...01 Manual of Welding Planning and Design Guidelines - Phase III PANEL SP-3 Ship Design Considerations: Adaptation of Japanese Pre - 7 9 79 81 82 83 83

  17. JPL Facilities and Software for Collaborative Design: 1994 - Present

    NASA Technical Reports Server (NTRS)

    DeFlorio, Paul A.

    2004-01-01

    The viewgraph presentation provides an overview of the history of the JPL Project Design Center (PDC) and, since 2000, the Center for Space Mission Architecture and Design (CSMAD). The discussion includes PDC objectives and scope; mission design metrics; distributed design; a software architecture timeline; facility design principles; optimized design for group work; CSMAD plan view, facility design, and infrastructure; and distributed collaboration tools.

  18. Implementation of a Web-Based Collaborative Process Planning System

    NASA Astrophysics Data System (ADS)

    Wang, Huifen; Liu, Tingting; Qiao, Li; Huang, Shuangxi

    Under the networked manufacturing environment, all phases of product manufacturing involving design, process planning, machining and assembling may be accomplished collaboratively by different enterprises, even different manufacturing stages of the same part may be finished collaboratively by different enterprises. Based on the self-developed networked manufacturing platform eCWS(e-Cooperative Work System), a multi-agent-based system framework for collaborative process planning is proposed. In accordance with requirements of collaborative process planning, share resources provided by cooperative enterprises in the course of collaboration are classified into seven classes. Then a reconfigurable and extendable resource object model is built. Decision-making strategy is also studied in this paper. Finally a collaborative process planning system e-CAPP is developed and applied. It provides strong support for distributed designers to collaboratively plan and optimize product process though network.

  19. 19 CFR 152.102 - Definitions.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ...) Engineering, development, artwork, design work, and plans and sketches that are undertaken elsewhere than in... work to which paragraph (a)(1)(iv) of this section applies will be treated as an assist if the service or work: (i) Is performed by an individual domiciled within the United States; (ii) Is performed by...

  20. Analysis and preliminary design of Kunming land use and planning management information system

    NASA Astrophysics Data System (ADS)

    Li, Li; Chen, Zhenjie

    2007-06-01

    This article analyzes Kunming land use planning and management information system from the system building objectives and system building requirements aspects, nails down the system's users, functional requirements and construction requirements. On these bases, the three-tier system architecture based on C/S and B/S is defined: the user interface layer, the business logic layer and the data services layer. According to requirements for the construction of land use planning and management information database derived from standards of the Ministry of Land and Resources and the construction program of the Golden Land Project, this paper divides system databases into planning document database, planning implementation database, working map database and system maintenance database. In the design of the system interface, this paper uses various methods and data formats for data transmission and sharing between upper and lower levels. According to the system analysis results, main modules of the system are designed as follows: planning data management, the planning and annual plan preparation and control function, day-to-day planning management, planning revision management, decision-making support, thematic inquiry statistics, planning public participation and so on; besides that, the system realization technologies are discussed from the system operation mode, development platform and other aspects.

  1. DoD Workshop on Southeast Regional Planning and Sustainability

    DTIC Science & Technology

    2007-04-01

    development (Berke, 2007). Weak plans and ordinances in these locations mean limited knowledge about existing human and natural resource systems...research on sustainable community design, and disseminate that knowledge through innovative teaching and outreach. Rather than serving as outside...technical work is being done to address these issues, much institutional change will be needed to tie this knowledge to advance regional plans and

  2. Reasoning with inaccurate spatial knowledge. [for Planetary Rover

    NASA Technical Reports Server (NTRS)

    Doshi, Rajkumar S.; White, James E.; Lam, Raymond; Atkinson, David J.

    1988-01-01

    This paper describes work in progress on spatial planning for a semiautonomous mobile robot vehicle. The overall objective is to design a semiautonomous rover to plan routes in unknown, natural terrains. The approach to spatial planning involves deduction of common-sense spatial knowledge using geographical information, natural terrain representations, and assimilation of new and possibly conflicting terrain information. This report describes the ongoing research and implementation.

  3. A Preservation Program for the Colorado State University Libraries. The Final Report of the ARL/OMS Preservation Planning Program.

    ERIC Educational Resources Information Center

    Green, Stephen; And Others

    This final report is a product of a Preservation Planning Program (PPP) self-study conducted by the Colorado State University Library (CSUL) working with the Association of Research Libraries' (ARL) Office of Management Studies (OMS). Designed to put self-help tools into the hands of library staff responsible for developing plans and procedures…

  4. Pensions, investments, and taxation.

    PubMed

    Gerstein, Mitchell

    2010-01-01

    Having for retirement has become increasingly challenging with retirement plan rules changing along with taxes and investment choices. The only certainty is that everyone needs to save money in order to be able to stop working. The best plan for a small business can be complex and confusing but rewarding if designed properly. There are a number of options available and many factors to consider in choosing the most appropriate plan.

  5. Network Speech Systems Technology Program

    NASA Astrophysics Data System (ADS)

    Weinstein, C. J.

    1980-09-01

    This report documents work performed during FY 1980 on the DCA-sponsored Network Speech Systems Technology Program. The areas of work reported are: (1) communication systems studies in Demand-Assignment Multiple Access (DAMA), voice/data integration, and adaptive routing, in support of the evolving Defense Communications System (DCS) and Defense Switched Network (DSN); (2) a satellite/terrestrial integration design study including the functional design of voice and data interfaces to interconnect terrestrial and satellite network subsystems; and (3) voice-conferencing efforts dealing with support of the Secure Voice and Graphics Conferencing (SVGC) Test and Evaluation Program. Progress in definition and planning of experiments for the Experimental Integrated Switched Network (EISN) is detailed separately in an FY 80 Experiment Plan Supplement.

  6. EARLY ENTRANCE COPRODUCTION PLANT

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    David Storm; Govanon Nongbri; Steve Decanio

    2004-01-12

    The overall objective of this project is the three phase development of an Early Entrance Coproduction Plant (EECP) which uses petroleum coke to produce at least one product from at least two of the following three categories: (1) electric power (or heat), (2) fuels, and (3) chemicals using ChevronTexaco's proprietary gasification technology. The objective of Phase I is to determine the feasibility and define the concept for the EECP located at a specific site; develop a Research, Development, and Testing (RD&T) Plan to mitigate technical risks and barriers; and prepare a Preliminary Project Financing Plan. The objective of Phase IImore » is to implement the work as outlined in the Phase I RD&T Plan to enhance the development and commercial acceptance of coproduction technology. The objective of Phase III is to develop an engineering design package and a financing and testing plan for an EECP located at a specific site. The project's intended result is to provide the necessary technical, economic, and environmental information needed by industry to move the EECP forward to detailed design, construction, and operation. The partners in this project are Texaco Energy Systems LLC or TES (a subsidiary of ChevronTexaco), General Electric (GE), Praxair, and Kellogg Brown & Root (KBR) in addition to the U.S. Department of Energy (DOE). TES is providing gasification technology and Fischer-Tropsch (F-T) technology developed by Rentech, Inc., GE is providing combustion turbine technology, Praxair is providing air separation technology, and KBR is providing engineering. During Phase I, a design basis for the Fischer-Tropsch Synthesis section was developed based on limited experience with the specified feed gas and operating conditions. The objective of this Task in Phase II RD&T work was to confirm the performance of the F-T reactor at the set design conditions. Although much of the research, development, and testing work were done by TES outside of this project, several important issues were addressed in this phase of the project. They included Rejuvenation/Regeneration of the Fischer-Tropsch Catalyst, online Catalyst Withdrawal and Addition from the synthesis reactor, and the Fischer-Tropsch Design Basis Confirmation. In Phase III the results from these RD&T work will be incorporated in developing the engineering design package. This Topical Report documents the Phase II RD&T work that was completed for this task.« less

  7. PLANNING, PROGRAMMING, DESIGNING THE COMMUNITY COLLEGE, PROCEEDINGS OF A CONFERENCE SPONSORED BY THE COLLEGE OF ARCHITECTURE AND URBAN PLANNING AND THE CENTER FOR THE DEVELOPMENT OF COMMUNITY COLLEGE EDUCATION (UNIVERSITY OF WASHINGTON, APRIL 24-25, 1967).

    ERIC Educational Resources Information Center

    SONDALLE, MARVIN P.

    PARTICIPANTS AT THIS CONFERENCE DEFINED THE ESSENTIAL MAJOR STEPS IN FACILITY PLANNING FOR A NEW CAMPUS AS SITE SELECTION, FINANCIAL PROGRAMMING, CAMPUS PLANNING, AND CONSTRUCTION. THEY ALSO AGREED THAT THE COLLEGE ADMINISTRATION AND THE ARCHITECTURAL STAFF MUST WORK TOGETHER AT EVERY STAGE OF THE PROGRAM. PRESENT TECHNIQUES OF ENROLLMENT…

  8. Information Presentation

    NASA Technical Reports Server (NTRS)

    Holden, Kritina L.; Thompson, Shelby G.; Sandor, Aniko; McCann, Robert S.; Kaiser, Mary K.; Adelstein, Barnard D.; Begault, Durand R.; Beutter, Brent R.; Stone, Leland S.; Godfroy, Martine

    2009-01-01

    The goal of the Information Presentation Directed Research Project (DRP) is to address design questions related to the presentation of information to the crew. In addition to addressing display design issues associated with information formatting, style, layout, and interaction, the Information Presentation DRP is also working toward understanding the effects of extreme environments encountered in space travel on information processing. Work is also in progress to refine human factors-based design tools, such as human performance modeling, that will supplement traditional design techniques and help ensure that optimal information design is accomplished in the most cost-efficient manner. The major areas of work, or subtasks, within the Information Presentation DRP for FY10 are: 1) Displays, 2) Controls, 3) Procedures and Fault Management, and 4) Human Performance Modeling. The poster will highlight completed and planned work for each subtask.

  9. Rewiring a Working Library or Teaching an Old Dog New Tricks.

    ERIC Educational Resources Information Center

    White, Robert L.; Jaffe, Lee David

    1995-01-01

    This case study describes the planning, funding, and implementation of a complete data-wiring renovation at the University of California, Santa Cruz library. Highlights include design principles; project schedule; benefits for staff's electronic mail and network use and for upgraded public terminals; and the importance of planning and…

  10. Planning Additions to Academic Library Buildings: A Seamless Approach.

    ERIC Educational Resources Information Center

    Hawthorne, Pat, Ed.; Martin, Ron G., Ed.

    This document presents three case studies that illustrate how library staffs and architectural design teams can work together to plan additions that are successful solutions to building problems. The case studies cover the experiences of Hope College, Holland, Michigan (David Jensen, Margaret Jensen), Western Maryland College, Westminster,…

  11. A Wireless Communications Laboratory on Cellular Network Planning

    ERIC Educational Resources Information Center

    Dawy, Z.; Husseini, A.; Yaacoub, E.; Al-Kanj, L.

    2010-01-01

    The field of radio network planning and optimization (RNPO) is central for wireless cellular network design, deployment, and enhancement. Wireless cellular operators invest huge sums of capital on deploying, launching, and maintaining their networks in order to ensure competitive performance and high user satisfaction. This work presents a lab…

  12. Brothers Grimm. [Lesson Plan].

    ERIC Educational Resources Information Center

    Discovery Communications, Inc., Bethesda, MD.

    Based on Grimm's fairy tales, this lesson plan presents activities designed to help students understand that fairy tales connect them to earlier generations, help them think about present situations, that magic figures prominently in fairy tales, and that fairy tales can inspire readers to create original works of art. The main activity in the…

  13. Work-Life Compendium, 2001: 150 Canadian Statistics on Work, Family & Well-Being.

    ERIC Educational Resources Information Center

    Johnson, Karen L.; Lero, Donna S.; Rooney, Jennifer A.

    The issue of integrating work and family responsibilities has been the subject of federal, provincial, and territorial policy planning and several task forces in Canada. This report plus executive summary, designed to inform the dialogue and stimulate continued discussion, brings together a wide variety of work-life facts and figures related to…

  14. Conducting pilot and feasibility studies.

    PubMed

    Cope, Diane G

    2015-03-01

    Planning a well-designed research study can be tedious and laborious work. However, this process is critical and ultimately can produce valid, reliable study findings. Designing a large-scale randomized, controlled trial (RCT)-the gold standard in quantitative research-can be even more challenging. Even the most well-planned study potentially can result in issues with research procedures and design, such as recruitment, retention, or methodology. One strategy that may facilitate sound study design is the completion of a pilot or feasibility study prior to the initiation of a larger-scale trial. This article will discuss pilot and feasibility studies, their advantages and disadvantages, and implications for oncology nursing research. 
.

  15. Overview of Vertical Axis Wind Turbine (VAWT)

    NASA Technical Reports Server (NTRS)

    Sullivan, W. N.

    1979-01-01

    A survey is presented of the practices which were applied for designing VAWT blades. An attempt is made to discuss strengths and weaknesses of the existing procedures. Discussion is provided on planned or suggested future work in developing improved design tools.

  16. 23 CFR 656.5 - Eligibility.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... carpool lanes. Eligible work may include preliminary engineering to determine traffic flow and design criteria, signing, pavement markings, traffic control devices, and minor physical modifications to permit... any existing or planned mass transportation service, but should be designed so that the facility could...

  17. 23 CFR 656.5 - Eligibility.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... carpool lanes. Eligible work may include preliminary engineering to determine traffic flow and design criteria, signing, pavement markings, traffic control devices, and minor physical modifications to permit... any existing or planned mass transportation service, but should be designed so that the facility could...

  18. 23 CFR 656.5 - Eligibility.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... carpool lanes. Eligible work may include preliminary engineering to determine traffic flow and design criteria, signing, pavement markings, traffic control devices, and minor physical modifications to permit... any existing or planned mass transportation service, but should be designed so that the facility could...

  19. 23 CFR 656.5 - Eligibility.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... carpool lanes. Eligible work may include preliminary engineering to determine traffic flow and design criteria, signing, pavement markings, traffic control devices, and minor physical modifications to permit... any existing or planned mass transportation service, but should be designed so that the facility could...

  20. 23 CFR 656.5 - Eligibility.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... carpool lanes. Eligible work may include preliminary engineering to determine traffic flow and design criteria, signing, pavement markings, traffic control devices, and minor physical modifications to permit... any existing or planned mass transportation service, but should be designed so that the facility could...

  1. SPANR planning and scheduling

    NASA Astrophysics Data System (ADS)

    Freund, Richard F.; Braun, Tracy D.; Kussow, Matthew; Godfrey, Michael; Koyama, Terry

    2001-07-01

    SPANR (Schedule, Plan, Assess Networked Resources) is (i) a pre-run, off-line planning and (ii) a runtime, just-in-time scheduling mechanism. It is designed to support primarily commercial applications in that it optimizes throughput rather than individual jobs (unless they have highest priority). Thus it is a tool for a commercial production manager to maximize total work. First the SPANR Planner is presented showing the ability to do predictive 'what-if' planning. It can answer such questions as, (i) what is the overall effect of acquiring new hardware or (ii) what would be the effect of a different scheduler. The ability of the SPANR Planner to formulate in advance tree-trimming strategies is useful in several commercial applications, such as electronic design or pharmaceutical simulations. The SPANR Planner is demonstrated using a variety of benchmarks. The SPANR Runtime Scheduler (RS) is briefly presented. The SPANR RS can provide benefit for several commercial applications, such as airframe design and financial applications. Finally a design is shown whereby SPANR can provide scheduling advice to most resource management systems.

  2. Release Fixed Heel Point (FHP) Accommodation Model Verification and Validation (V and V) Plan - Rev A

    DTIC Science & Technology

    2017-01-23

    5e. TASK NUMBER N/A 5f. WORK UNIT NUMBER N/A 7. PERFORMING ORGANIZATION NAME(S) AND ADDRESS(ES) AND ADDRESS(ES) RDECOM-TARDEC-ACT Attn...occupant work space, central 90% of the Soldier population, encumbrance, posture and position, verification and validation, computer aided design...factors engineers could benefit by working with vehicle designers to perform virtual assessments in CAD when there is not enough time and/or funding to

  3. Learning Reverse Engineering and Simulation with Design Visualization

    NASA Technical Reports Server (NTRS)

    Hemsworth, Paul J.

    2018-01-01

    The Design Visualization (DV) group supports work at the Kennedy Space Center by utilizing metrology data with Computer-Aided Design (CAD) models and simulations to provide accurate visual representations that aid in decision-making. The capability to measure and simulate objects in real time helps to predict and avoid potential problems before they become expensive in addition to facilitating the planning of operations. I had the opportunity to work on existing and new models and simulations in support of DV and NASA’s Exploration Ground Systems (EGS).

  4. Proceedings of the Annual Military Librarians’ Workshop (29th) Held in Colorado Springs, CO, on 9-11 October 1985

    DTIC Science & Technology

    1985-10-11

    structure works merely because it is well- designed and looks good or. paper. They know form experience that the organizational system works well only...organizational communication doesn’t just happen; it needs to be planned for, designed , executed, and evaluated. The library manager who believes that...Communication) •: M.A., University of Colorado (Environmental Design ) A., University of Colorado (Communication) According to Dr. Rader, librarians, as keepers

  5. [A decade of reflection on health plans in Spain. SESPAS report 2010].

    PubMed

    Fiuza Pérez, María Dolores; Aguiar Rodríguez, Juan Francisco; Monzón Batista, Nayra

    2010-12-01

    This article reports the experience of the Working Group of the SESPAS-SCSP (Spanish Society of Public Health and Healthcare Administration-Canary Islands Society of Public Health) in health policy and planning during the first decade of the 21st century and its possible impact on the design of health planning. We review the conclusions reached from 2000 to 2008 in the first five Biannual Planning and Health Policy meetings that took place during that period. The workshops were designed with two speakers who presented different views of the subject under discussion, a moderator, who led the debate on the findings, and a narrator who served as a notary and also took responsibility for the text summary of each table. Two general narrators were responsible for the final wording of the conclusions of each workshop or biannual meeting. From 2000 to 2008, there were 25 round tables with 121 conclusions and 160 participants. We believe that the SESPAS working groups provide multidisciplinary professional values within a context of debate in a professional environment, and create spaces for reflection, thus helping to improve the health planning system in Spain. Copyright © 2010 SESPAS. Published by Elsevier Espana. All rights reserved.

  6. The road plan model: Information model for planning road building activities

    NASA Technical Reports Server (NTRS)

    Azinhal, Rafaela K.; Moura-Pires, Fernando

    1994-01-01

    The general building contractor is presented with an information model as an approach for deriving a high-level work plan of construction activities applied to road building. Road construction activities are represented in a Road Plan Model (RPM), which is modeled in the ISO standard STEP/EXPRESS and adopts various concepts from the GARM notation. The integration with the preceding road design stage and the succeeding phase of resource scheduling is discussed within the framework of a Road Construction Model. Construction knowledge is applied to the road design and the terrain model of the surrounding road infrastructure for the instantiation of the RPM. Issues regarding the implementation of a road planner application supporting the RPM are discussed.

  7. Hybrid Program Design: What Works for Adult Learners in a Professional Degree Program?

    ERIC Educational Resources Information Center

    Stevens, Christine Rowader

    2017-01-01

    Working adults planning to pursue higher education programs to advance their careers often face conflicting demands. Colleges and universities are challenged to offer non-traditional programs with more scheduling flexibility, allowing adult learners to manage multiple work, family, and other obligations while attending school (Dana, 2013;…

  8. Return to Work (RTW). Trainer's Manual and Participant's Manual.

    ERIC Educational Resources Information Center

    Roessler, Richard; Farley, Roy

    Return-to-Work is a short-term group counseling intervention consisting of three major components: coping with disability and related life changes, life and benefits planning, and return to work. It is designed to enhance functional adaptation to mid-career disabilities by using structured activities and discussion to teach individuals how to…

  9. 48 CFR 252.217-7003 - Changes.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ...) Drawings, designs, plans, and specifications; (2) Work itemized; (3) Place of performance of the work; (4) Time of commencement or completion of the work; and (5) Any other requirement of the job order. (b) If a change causes an increase or decrease in the cost of, or time required for, performance of the job...

  10. Design and Laboratory Implementation of Autonomous Optimal Motion Planning for Non-Holonomic Planetary Rovers

    DTIC Science & Technology

    2012-12-01

    autonomy helped to maximize a Mars day journey, because humans could only plan the first portion of the journey based on images sent from the rover...safe trajectory based on its sensors [1]. The distance between Mars and Earth ranges from 100-200 million miles [1] and at this distance, the time...This feature worked for the pre- planned maneuvers, which were planned by humans the day before based on available sensory and visual inputs. Once the

  11. The role of localities in karsten’s works in architecture and city of Semarang

    NASA Astrophysics Data System (ADS)

    Sidharta Muljadinata, Albertus; Antariksa; Salura, Purnama

    2018-03-01

    Herman Thomas Karsten architectural masterpiece becomes objects of cultural heritage that must be appreciated, it covers town planning and architectural design. On progress, Karsten’s masterpiece hasn’t changed much as a result of globalization that hits Semarang city; his masterpiece is considered well, valued by the society, it is possibly because of the conceptual approach that prioritizes and blends the local aspects of wealth. Collecting data including literature study, synchronic and diachronic method, will produce a red thread ideology that influences Karsten’s way of thinking. History shows, the architectural work that survives is that have the local aspect in the concept of planning. Through the literature review of the Theory of the City and Local Aspects, and by taking the case on the cities of Karsten design, there will be a relation between the Local Aspect and the Concept of Town Planning by Karsten. Case Study in Semarang city, which is also the best or the most completed masterpiece of Karsten, becomes a reference that corresponds to the literature study, so we get the scope of the local aspect that consists of Place, People and Period always related with cultural, social and economic aspect, and all of these have correlation with the town planning and architectural work of Karsten.

  12. Recommendations for Child Care Centers. Revised Edition.

    ERIC Educational Resources Information Center

    Moore, Gary T.; Lane, Carol G.; Hill, Ann B.; Cohen, Uriel; McGinty, Tim

    Part of a seven-volume series on children's environments, this monograph is a design guide for policy, planning, programming, design, and evaluation of early childhood facilities. The design guide includes 115 patterns for large, medium, and small child care centers in neighborhood and work-place settings. Many of the patterns are appropriate also…

  13. 23 CFR 661.5 - What definitions apply to this regulation?

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... prescribed scope of work. Preliminary engineering (PE) means planning, survey, design, engineering, and... survey staking functions considered necessary for effective control of the construction operations... carrying capacity (comparison of the original design load to the State legal load), clearance, or approach...

  14. 23 CFR 661.5 - What definitions apply to this regulation?

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... prescribed scope of work. Preliminary engineering (PE) means planning, survey, design, engineering, and... survey staking functions considered necessary for effective control of the construction operations... carrying capacity (comparison of the original design load to the State legal load), clearance, or approach...

  15. 23 CFR 661.5 - What definitions apply to this regulation?

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... prescribed scope of work. Preliminary engineering (PE) means planning, survey, design, engineering, and... survey staking functions considered necessary for effective control of the construction operations... carrying capacity (comparison of the original design load to the State legal load), clearance, or approach...

  16. 23 CFR 661.5 - What definitions apply to this regulation?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... prescribed scope of work. Preliminary engineering (PE) means planning, survey, design, engineering, and... survey staking functions considered necessary for effective control of the construction operations... carrying capacity (comparison of the original design load to the State legal load), clearance, or approach...

  17. 23 CFR 661.5 - What definitions apply to this regulation?

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... prescribed scope of work. Preliminary engineering (PE) means planning, survey, design, engineering, and... survey staking functions considered necessary for effective control of the construction operations... carrying capacity (comparison of the original design load to the State legal load), clearance, or approach...

  18. Best management practices used by KYTC for on-site erosion control.

    DOT National Transportation Integrated Search

    2006-11-01

    New erosion control procedures (ECP) have recently been implemented by the Kentucky Transportation Cabinet (KYTC). Previously, consultants and designers developed the ECP as a part of the design plans. In many cases these did not work in the field. T...

  19. Environmental Assessment. Instructor Guide. Working for Clean Water: An Information Program for Advisory Groups.

    ERIC Educational Resources Information Center

    Buskirk, E. Drannon, Jr.

    Described is an hour-long learning session on environmental assessment that is designed to help citizen advisory groups improve decision making in water quality planning. The instructor's guide addresses: (1) environmental considerations in water quality planning, and (2) the identification of primary and secondary impacts of wastewater projects.…

  20. Modular space station phase B extension program master plan

    NASA Technical Reports Server (NTRS)

    Munsey, E. H.

    1971-01-01

    The project is defined for design, development, fabrication, test, and pre-mission and mission operations of a shuttle-launched modular space station. The project management approach is described in terms of organization, management requirements, work breakdown structure, schedule, time-phased logic, implementation plans, manpower, and funding. The programmatic and technical problems are identified.

  1. Notes on Transition Planning for College. Practice Notes

    ERIC Educational Resources Information Center

    Center for Mental Health in Schools at UCLA, 2008

    2008-01-01

    All students can benefit from well-designed transition planning for college. With specific reference to those students identified for special education, middle and high schools have a responsibility under IDEA to focus on a range of transition interventions. Family stakeholders in a community need to work together to ensure the middle school and…

  2. Preservation Planning Project Study Team. Final Report.

    ERIC Educational Resources Information Center

    Pittsburgh Univ., PA. Libraries.

    This final report is a product of a comprehensive 14-month Preservation Planning Program (PPP) self-study conducted by the University of Pittsburgh Libraries, working with the Association of Research Libraries' (ARL) Office of Management Studies. The PPP is designed to put self-help tools into the hands of library staff responsible for developing…

  3. Empowering Families during the Early Intervention Planning Process

    ERIC Educational Resources Information Center

    Byington, Teresa A.; Whitby, Peggy J. S.

    2011-01-01

    Parents play important roles as advocates for their child with a disability. Advocacy is the process of striving to improve the quality of life for someone else. The Individuals With Disabilities Education Act (IDEA) requires parents and professionals to work together to design a service delivery plan for children with disabilities. An…

  4. Higher Education. Lifelong Learning and Community Service: A Profile of Action and Responsibility.

    ERIC Educational Resources Information Center

    Champagne, Joseph E.

    Two projects, designed to serve as technical input to the developing Texas State Plan for Higher Continuing Education, focused on: (1) enrollment trends and needs, institutional activities, and statewide planning across the nation; and (2) higher education and community services. Both projects involved extensive survey work of institutional visits…

  5. Succeeding with Struggling Students: A Planning Resource for Raising Achievement

    ERIC Educational Resources Information Center

    Richardson, Marti T.

    2006-01-01

    Schools today are working harder than ever to help ensure that "all" children "can" learn and achieve high standards. Marti Richardson, a recognized leader in professional and curriculum development, delivers an innovative, classroom-tested program with planning tools to customize it for any school or district's data-based needs. Designed around a…

  6. Advanced software development workstation: Object-oriented methodologies and applications for flight planning and mission operations

    NASA Technical Reports Server (NTRS)

    Izygon, Michel

    1993-01-01

    The work accomplished during the past nine months in order to help three different organizations involved in Flight Planning and in Mission Operations systems, to transition to Object-Oriented Technology, by adopting one of the currently most widely used Object-Oriented analysis and Design Methodology is summarized.

  7. Research Utilizing Problem Solving (RUPS) - Classroom Version. Description of Teacher Inservice Education Materials.

    ERIC Educational Resources Information Center

    National Education Association, Washington, DC. Project on Utilization of Inservice Education R & D Outcomes.

    The workshop instructional materials described here are designed to try out a systematic problem solving process as a way of working toward improvements in the school setting. Topics include diagnosis using force field technique, small group dynamics, planning for action, and planning a RUPS (Research Using Problem Solving) project. This…

  8. A Model for Talent Management and Career Planning

    ERIC Educational Resources Information Center

    Waheed, Sajjad; Zaim, A. Halim

    2015-01-01

    This paper discusses a talent management and career planning system designed based on the performance and qualifications of a group of interns working for an emerging social media company located in Istanbul. The proposed model is dynamic, comparative, and perceptional in constructing a talent pool for an organization. This system was developed…

  9. The Iterative Design Process in Research and Development: A Work Experience Paper

    NASA Technical Reports Server (NTRS)

    Sullivan, George F. III

    2013-01-01

    The iterative design process is one of many strategies used in new product development. Top-down development strategies, like waterfall development, place a heavy emphasis on planning and simulation. The iterative process, on the other hand, is better suited to the management of small to medium scale projects. Over the past four months, I have worked with engineers at Johnson Space Center on a multitude of electronics projects. By describing the work I have done these last few months, analyzing the factors that have driven design decisions, and examining the testing and verification process, I will demonstrate that iterative design is the obvious choice for research and development projects.

  10. SeaSketch: Implementation of a Decision-Support Platform for a Channel Islands National Marine Sanctuary Multi-sector Working Group

    NASA Astrophysics Data System (ADS)

    Goldberg, G.; McClintock, W.

    2016-12-01

    Effective interagency and cross-sector coordination is essential to ecosystem based management which depends on processes characterized by collaboration and science-based information. Many technological barriers that exist in the development of science-based management plans are closely tied to process challenges, such as the sharing of data and information or the inclusion of parties with varied levels of technical experience. The Channel Islands National Marine Sanctuary has convened a diverse working group to develop recommendations for the management of marine shipping in and around the Santa Barbara Channel, as well as recommendations regarding research needs and outreach strategies. Working group members take a multi-issue approach with four distinct goals related to the reduction of ship strikes on whales, emissions and air quality, conflicting ocean uses, and issues of navigational safety. Members range from industry representatives, scientists, and multiple local and federal government entities. The recommended management plans will be based in the best-available science, and will build off of previous efforts, making this an interesting case study of adaptive management. In addition to support from the Sanctuary and professional facilitators, the group is using a decision-support platform, SeaSketch (safepassage.seasketch.org). SeaSketch is a web-based GIS that supports collaborative science-based marine spatial planning (MSP). Each feature supports a step of the MSP process, from data gathering, identification of data needs, the design of spatial plans, evaluation of those plans with analytics, and map-based forums that facilitate data-driven discussions. Working group members are able to access these tools to explore management options and collaborate remotely, in addition to using the platform during in-person meetings and webinars. Empowering diverse audiences to engage in the design of science-based plans is of key importance to developing ecosystem-based management plans where multi-sector participation and inter-agency coordination are critical.

  11. SeaSketch: Implementation of a Decision-Support Platform for a Channel Islands National Marine Sanctuary Multi-sector Working Group

    NASA Astrophysics Data System (ADS)

    Goldberg, G.; McClintock, W.

    2016-02-01

    Effective interagency and cross-sector coordination is essential to ecosystem based management which depends on processes characterized by collaboration and science-based information. Many technological barriers that exist in the development of science-based management plans are closely tied to process challenges, such as the sharing of data and information or the inclusion of parties with varied levels of technical experience. The Channel Islands National Marine Sanctuary has convened a diverse working group to develop recommendations for the management of marine shipping in and around the Santa Barbara Channel, as well as recommendations regarding research needs and outreach strategies. Working group members take a multi-issue approach with four distinct goals related to the reduction of ship strikes on whales, emissions and air quality, conflicting ocean uses, and issues of navigational safety. Members range from industry representatives, scientists, and multiple local and federal government entities. The recommended management plans will be based in the best-available science, and will build off of previous efforts, making this an interesting case study of adaptive management. In addition to support from the Sanctuary and professional facilitators, the group is using a decision-support platform, SeaSketch (safepassage.seasketch.org). SeaSketch is a web-based GIS that supports collaborative science-based marine spatial planning (MSP). Each feature supports a step of the MSP process, from data gathering, identification of data needs, the design of spatial plans, evaluation of those plans with analytics, and map-based forums that facilitate data-driven discussions. Working group members are able to access these tools to explore management options and collaborate remotely, in addition to using the platform during in-person meetings and webinars. Empowering diverse audiences to engage in the design of science-based plans is of key importance to developing ecosystem-based management plans where multi-sector participation and inter-agency coordination are critical.

  12. The development of a program analysis environment for Ada

    NASA Technical Reports Server (NTRS)

    Brown, David B.; Carlisle, Homer W.; Chang, Kai-Hsiung; Cross, James H.; Deason, William H.; Haga, Kevin D.; Huggins, John R.; Keleher, William R. A.; Starke, Benjamin B.; Weyrich, Orville R.

    1989-01-01

    A unit level, Ada software module testing system, called Query Utility Environment for Software Testing of Ada (QUEST/Ada), is described. The project calls for the design and development of a prototype system. QUEST/Ada design began with a definition of the overall system structure and a description of component dependencies. The project team was divided into three groups to resolve the preliminary designs of the parser/scanner: the test data generator, and the test coverage analyzer. The Phase 1 report is a working document from which the system documentation will evolve. It provides history, a guide to report sections, a literature review, the definition of the system structure and high level interfaces, descriptions of the prototype scope, the three major components, and the plan for the remainder of the project. The appendices include specifications, statistics, two papers derived from the current research, a preliminary users' manual, and the proposal and work plan for Phase 2.

  13. E-Learning Systems: Promises and Pitfalls

    ERIC Educational Resources Information Center

    Chan, Carlyle H.; Robbins, Lisa I.

    2006-01-01

    Objective: This review examines the use of e-learning systems in psychiatric education. Method: The authors review the Instructional System Design process, focusing on ADDIE (Analysis, Design, Development, Implementation, and Evaluation). The authors also report on two representative teaching projects, discussing the planning, work, and assessment…

  14. Teamwork on Assessments Creates Powerful Professional Development

    ERIC Educational Resources Information Center

    McTighe, Jay; Emberger, Marcella

    2006-01-01

    Teacher collaboration is a powerful form of professional learning. One focus for collaborative efforts is designing assessments. When teachers design assessments, give each other feedback through peer reviews, evaluate student work, and plan together for improvement, they are engaged in highly effective professional development. Assessments have…

  15. The 25 kW power module evolution study. Part 3: Conceptual designs for power module evolution. Volume 2: Program plans

    NASA Technical Reports Server (NTRS)

    1979-01-01

    A plan is presented for the evolutionary development and deployment of the power module system with performance capabilities required to support the 1983 to 1990 user requirements. Aspects summarized include program functional, operational, and hardware elements; program work breakdown and specification items; development plans and schedules for developmental and technology milestones; test concepts and timeliness; and ground and orbit operations concepts.

  16. Data categories for marine planning

    USGS Publications Warehouse

    Lightsom, Frances L.; Cicchetti, Giancarlo; Wahle, Charles M.

    2015-01-01

    The U.S. National Ocean Policy calls for a science- and ecosystem-based approach to comprehensive planning and management of human activities and their impacts on America’s oceans. The Ocean Community in Data.gov is an outcome of 2010–2011 work by an interagency working group charged with designing a national information management system to support ocean planning. Within the working group, a smaller team developed a list of the data categories specifically relevant to marine planning. This set of categories is an important consensus statement of the breadth of information types required for ocean planning from a national, multidisciplinary perspective. Although the categories were described in a working document in 2011, they have not yet been fully implemented explicitly in online services or geospatial metadata, in part because authoritative definitions were not created formally. This document describes the purpose of the data categories, provides definitions, and identifies relations among the categories and between the categories and external standards. It is intended to be used by ocean data providers, managers, and users in order to provide a transparent and consistent framework for organizing and describing complex information about marine ecosystems and their connections to humans.

  17. "BodyWorks": A Parent-Focused Program to Promote Healthful Eating and Physical Activity for Children and Adolescents

    ERIC Educational Resources Information Center

    Borden, Valerie Melino; Labiner-Wolfe, Judith; Blake, Susan M.; Marr, Amanda; Rowe, Jonelle; Wasserman, Jill

    2012-01-01

    The "BodyWorks" program was designed to help parents improve family eating and activity behaviors. "BodyWorks" was associated with significant gains in parents' knowledge about nutrition and activity, and greater self-efficacy to set family nutrition goals, plan physical activities, and change eating habits. (Contains 1 table.)

  18. Satellite-Distributed Educational Television For Developing Countries; Working Papers. Volume 4.

    ERIC Educational Resources Information Center

    Schramm, Wilbur; And Others

    This volume contains a collection of working papers designed to accompany the case studies of India and Latin America in providing a framework for the planning of educational broadcasting systems. The first two papers offer useful orientation to policy-makers who are considering educational television. Working Paper No. 3 compares the two media of…

  19. Task Design for Ways of Working: Making Distinctions in Teaching and Learning Mathematics

    ERIC Educational Resources Information Center

    Coles, Alf; Brown, Laurinda

    2016-01-01

    A problem identified in the literature around task design is the persistence of a gap between teacher intention and student activity. We show how principles designed around the making of distinctions and having an explicit language of mathematical thinking can eliminate the "gap" by guiding teacher planning, teacher actions in the…

  20. U.S. Air Force Research Laboratory's Need for Flow Physics and Control With Applications Involving Aero-Optics and Weapon Bay Cavities

    NASA Technical Reports Server (NTRS)

    Schmit, Ryan

    2010-01-01

    To develop New Flow Control Techniques: a) Knowledge of the Flow Physics with and without control. b) How does Flow Control Effect Flow Physics (What Works to Optimize the Design?). c) Energy or Work Efficiency of the Control Technique (Cost - Risk - Benefit Analysis). d) Supportability, e.g. (size of equipment, computational power, power supply) (Allows Designer to include Flow Control in Plans).

  1. Design for an integrated discipline operations control center for Space Station Freedom

    NASA Technical Reports Server (NTRS)

    Haines, Richard F.

    1993-01-01

    This paper presents selected features of a human factors oriented plan for a Space Station Freedom (SSF) ground Discipline Operations Center (DOC) that is integrated with other work areas used by multidisciplinary life scientists. This combined facility is referred to as an integrated DOC or IDOC. This plan is based upon the assumption that there will be a constantly changing array of specialized equipment and procedures used by life sciences principal investigators (PI) on the ground which must be linked to SSF through various DOC systems. Other sites will also be able to communicate with SSF (Anon., 1992). It is also assumed that cost reduction will be a major design consideration and that one integrated structure will be less expensive to build and operate than two separate ones. Since both the DOC personnel and PIs will need to communicate with the flight crew aboard SSF, the general interconnect architecture of the PIs' communication linkage is considered here. Key human factor design elements of this plan include: a candidate facility layout which accommodates three (3), multipurpose, rapidly reconfigurable work areas (suites) and consequent user traffic flow considerations, a multimedia telecommunications support capability, functional (human) traffic flow, optimized internal illumination and acoustics requirements, selected volumetric and safety requirements, and other architectural design parameters.

  2. [Women in informal economy health and work conditions Bogotá. 2007].

    PubMed

    Sotelo-Suárez, Nidia R; Quiroz-Arcentáles, Jorge L; Mahecha-Montilla, Charo P; López-Sánchez, Paola A

    2012-06-01

    To determine work and health conditions of women working in informal economy in Bogotá, as well as to recommend priority action plans for preventing illnesses and accidents related to work and their consequences. Descriptive observational study. This study analyzed information collected by local groups in work-related contexts during 2007 as part of a set of forms of intervention established according to the Plan de Atención Básica (Primary Care Plan). This plan included 3 715 units of informal work from every point of the city. 3 936 women registers in all were analyzed. This study reveals evident precariousness conditions of women in this economic sector. Specifically, there are certain evident conditions that had shown in this study such as low education levels, incomes below the minimum legal standards, high exposure to damaging health work conditions, long work hours, and few hours for leisure and free time. Furthermore, 75 % of women included in this study are female head of household. This condition makes them more vulnerable to a heavier family and social burden. Closer attention to informal economy phenomenon is suggested in order to avoid vulnerable conditions of working women. Besides, it is necessary to improve the articulation between Academy and forms of intervention through public policies for knowing deeply repeated phenomena regarding the population of study. This articulation can be thought for implementing programs designed for improving women's quality of life.

  3. TRACON Aircraft Arrival Planning and Optimization Through Spatial Constraint Satisfaction

    NASA Technical Reports Server (NTRS)

    Bergh, Christopher P.; Krzeczowski, Kenneth J.; Davis, Thomas J.; Denery, Dallas G. (Technical Monitor)

    1995-01-01

    A new aircraft arrival planning and optimization algorithm has been incorporated into the Final Approach Spacing Tool (FAST) in the Center-TRACON Automation System (CTAS) developed at NASA-Ames Research Center. FAST simulations have been conducted over three years involving full-proficiency, level five air traffic controllers from around the United States. From these simulations an algorithm, called Spatial Constraint Satisfaction, has been designed, coded, undergone testing, and soon will begin field evaluation at the Dallas-Fort Worth and Denver International airport facilities. The purpose of this new design is an attempt to show that the generation of efficient and conflict free aircraft arrival plans at the runway does not guarantee an operationally acceptable arrival plan upstream from the runway -information encompassing the entire arrival airspace must be used in order to create an acceptable aircraft arrival plan. This new design includes functions available previously but additionally includes necessary representations of controller preferences and workload, operationally required amounts of extra separation, and integrates aircraft conflict resolution. As a result, the Spatial Constraint Satisfaction algorithm produces an optimized aircraft arrival plan that is more acceptable in terms of arrival procedures and air traffic controller workload. This paper discusses the current Air Traffic Control arrival planning procedures, previous work in this field, the design of the Spatial Constraint Satisfaction algorithm, and the results of recent evaluations of the algorithm.

  4. Producibility Engineering and Planning (PEP)

    DTIC Science & Technology

    1977-01-01

    Materiel System, May 1976. c. Cesare Raimondi, "Estimating Drafting Time - Art , Science , Guess- work", Machine Design, 7 September 1972. d. Current Wage...Comprehensive 8 16 24 32 40 86 45 70 90 80 1/ Cesare Raimondi, "Estimating Drafting Time- Art , Science , Guesswork," Machine Design, September

  5. Resilience Planning Approaches “Ready-to-Use”: Lessons from EPA Partnerships. How to work with a community to design a nature-based hazard mitigation project

    EPA Science Inventory

    A fast-paced delivery of approaches developed in EPA partnerships to enable effective inclusion of environmental and social resilience into hazard mitigation planning. This presentation will cover a broad spectrum, from 1) EPA’s role in mitigation, 2) what a Regional Resil...

  6. 78 FR 66911 - Texas Eastern Transmission, LP; Notice of Intent To Prepare an Environmental Assessment for the...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-07

    ... mining of coal. The Commission will use this EA in its decision-making process to determine whether the... work to be performed for the planned longwall coal mining activities of Emerald Coal Resources, LP... pipeline facilities at their certificated design capacities during the planned longwall mining activities...

  7. Heuristics for Planning University Study at a Distance.

    ERIC Educational Resources Information Center

    Dodds, Agnes E.; Lawrence, Jeanette A.

    A model to describe how adults work on university courses at a distance from campus was developed at an Australian university. The model was designed to describe how students define the task/goal and plan their study, based on G. Ploya's (1957) Heuristic and A. Newell's and H. A. Simon's (1972) General Problem Solver. Verbal reports were obtained…

  8. Preservation at Stony Brook. Preservation Planning Program. Study Report.

    ERIC Educational Resources Information Center

    Cook, Donald C.; And Others

    This final report is a product of a Preservation Planning Program (PPP) self-study conducted by the State University of New York (SUNY), Stony Brook, working with the Association of Research Libraries' (ARL) Office of Management Studies (OMS). The PPP is designed to put self-help tools into the hands of library staff responsible for developing…

  9. Keiko, Killer Whale. [Lesson Plan].

    ERIC Educational Resources Information Center

    Discovery Communications, Inc., Bethesda, MD.

    This lesson plan presents activities designed to help students understand that Keiko, the killer whale, lived for a long time in an aquarium and had to be taught to live independently; and that computer users can get updates on how Keiko is doing. The main activity of the lesson involves middle school students working in small groups to produce a…

  10. Rebuilding for Sustainability: Case Studies in the Making (Presentation)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Billman, L.

    NREL has made significant contributions to communities suffering from natural disasters since 2007 in terms of technical assistance regarding energy efficiency and renewable energy options. NREL's work has covered all aspects of energy, including energy opportunities in community planning, policy design, new program design, and specific project design and implementation for energy related to electricity generation, building energy use, and transportation. This presentation highlights work done in New Orleans following Hurricane Katrina; Greensburg, Kansas, following a devastating tornado; and New York and New Jersey following Hurricane Sandy.

  11. Flexible sequential designs for multi-arm clinical trials.

    PubMed

    Magirr, D; Stallard, N; Jaki, T

    2014-08-30

    Adaptive designs that are based on group-sequential approaches have the benefit of being efficient as stopping boundaries can be found that lead to good operating characteristics with test decisions based solely on sufficient statistics. The drawback of these so called 'pre-planned adaptive' designs is that unexpected design changes are not possible without impacting the error rates. 'Flexible adaptive designs' on the other hand can cope with a large number of contingencies at the cost of reduced efficiency. In this work, we focus on two different approaches for multi-arm multi-stage trials, which are based on group-sequential ideas, and discuss how these 'pre-planned adaptive designs' can be modified to allow for flexibility. We then show how the added flexibility can be used for treatment selection and sample size reassessment and evaluate the impact on the error rates in a simulation study. The results show that an impressive overall procedure can be found by combining a well chosen pre-planned design with an application of the conditional error principle to allow flexible treatment selection. Copyright © 2014 John Wiley & Sons, Ltd.

  12. [Design of a plan for patient safety in pediatric surgery service].

    PubMed

    Paredes Esteban, R M; Castillo Fernández, A L; Miñarro del Moral, R; Garrido Pérez, J I; Granero Cendón, R; Gómez Beltrán, O; Berenguer Garcia, M J; Tejedor Fernández, M

    2014-10-01

    Patient safety is a key priority in quality management for healthcare services providers. Every patient is entitled to receive safe and effective healthcare. The aim of this study was to design a patient safety plan for a Paediatric Surgery Department. We carried out a literature review and we established a work group that included healthcare professionals from the Paediatric Surgery Department and the Quality and Medical Records Department. The group identified potential adverse events, failures and causes and established a rating using Failure Mode Effects Analysis. Potential risks were mapped out and a plan was designed establishing actions to reduce risks. We designated leaders to ensure the effective implementation of the plan. A total of 58 adverse events were identified in the Paediatric Surgery Department. We detected 128 failures that were produced by 211 different causes. The group developed a proposal with 424 specific measures to carry out preventive and/or remedial actions that were then narrowed down to 322. The group designed a plan to apply the programme, which is currently being implemented. The methodology used enabled obtaining key information for improvement of patient safety and developing preventive and/or remedial actions. These measures are applicable in practice, as they were designed using proposals and agreements with professionals that take active part in the care of children with surgical conditions.

  13. Decentralizing the Team Station: Simulation before Reality as a Best-Practice Approach.

    PubMed

    Charko, Jackie; Geertsen, Alice; O'Brien, Patrick; Rouse, Wendy; Shahid, Ammarah; Hardenne, Denise

    2016-01-01

    The purpose of this article is to share the logistical planning requirements and simulation experience of one Canadian hospital as it prepared its staff for the change from a centralized inpatient unit model to the decentralized design planned for its new community hospital. With the commitment and support of senior leadership, project management resources and clinical leads worked collaboratively to design a decentralized prototype in the form of a pod-style environment in the hospital's current setting. Critical success factors included engaging the right stakeholders, providing an opportunity to test new workflows and technology, creating a strong communication plan and building on lessons learned as subsequent pod prototypes are launched.

  14. Examining pre-service science teachers' developing pedagogical design capacity for planning and supporting task-based classroom discussions

    NASA Astrophysics Data System (ADS)

    Ross, Danielle Kristina

    Teachers face many challenges as we move forward into the age of the Next Generation Science Standards (NGSS) (Achieve, Inc., 2013). The NGSS aim to develop a population of scientifically literate and talented students who can participate in the "innovation-driven economy" (p. 1). In order to meet these goals, teachers must provide students with opportunities to engage in science and engineering practices (SEPs) and learn core ideas of these disciplines. This study followed pre-service secondary science teachers as they participated in a secondary science teacher preparation program intended to support the development of their pedagogical design capacity (Brown, 2009) related to planning and supporting whole-class taskbased discussions. Teacher educators in this program designed an intervention that aimed in supporting this development. This study examined a particular dimension of PDC -- specifically, PSTs effective use of resources to plan science lessons in which students engage in a high demand task, participate in SEPs, and discuss their work in a whole-class setting. In order to examine the effectiveness of the intervention, I had to define PDC a priori. I measured PDC by documenting how/whether PSTs engaged in the following instructional planning practices: developing Learning Goals, selecting and/or designing challenging tasks, anticipating student thinking, planning for monitoring student thinking, imagining the discussion storyline, planning questions, and planning marking strategies. Analyses showed a significant difference between baseline lesson plan scores and Instructional Performance scores. These findings suggest these patterns and changes were directly linked to the teacher preparation program. The mean increase in Instructional Performance scores during the course of the teacher preparation year further supports the effect of the teacher preparation coursework. Pre-service teachers with high pedagogical design capacity continually integrated the ambitious planning practices they learned in their coursework. In contrast, pre-service teachers with low pedagogical design capacity appeared to appropriate the vocabulary and language they learned in coursework, but did not integrate these practices at a high level. This study suggests that pre-service teachers who receive intensive instruction on ambitious planning practices for task-based discussion effectively develop the pedagogical design capacity to plan for task-based discussion lessons.

  15. National Site for the Regional IPM Centers

    Science.gov Websites

    Agriculture Working Group of State and Federal Scientists Summaries of past meetings November 13, 2002 January , 2004 Active membership Action plans of stakeholders United States Department of Agriculture - National Institute of Food and Agriculture Website managed by the Southern IPM Center. Design adapted from work by

  16. 75 FR 22165 - Publication of Open Government Directive

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-27

    ... Government Plan by May 27, 2010 to ensure prompt consideration by MSPB's Open Government Working Group. Comments received after May 27, 2010 will also be provided to MSPB's Open Government Working Group... specific actions are: (1) Publication of three high- value data sets; (2) designation of a senior agency...

  17. Relationship between Workplace Spatial Settings and Occupant-Perceived Support for Collaboration

    ERIC Educational Resources Information Center

    Hua, Ying; Loftness, Vivian; Heerwagen, Judith H.; Powell, Kevin M.

    2011-01-01

    The increasingly collaborative nature of knowledge-based work requires workplaces to support both dynamic interactions and concentrated work, both of which are critical for collaboration performance. Given the prevalence of open-plan settings, this requirement has created new challenges for workplace design. Therefore, an understanding of the…

  18. 40 CFR 35.917-1 - Content of facilities plan.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works-Clean Water Act § 35.917-1... construction drawings and specifications are to be prepared. This description shall include preliminary engineering data, cost estimates for design and construction of the treatment works, and a schedule for...

  19. Decoding the Past: The Work of Archaeologists.

    ERIC Educational Resources Information Center

    Art to Zoo: Teaching with the Power of Objects, 1995

    1995-01-01

    This thematic magazine helps teachers explore archaeology through an introductory article and three lesson plans, one with a student-take-home worksheet. Lesson 1 is designed for group work and involves identification of "artifacts" taken from familiar, contemporary settings, as the students attempt to describe the function of each artifact and to…

  20. Using Remote Sensing Data and Research Results for Urban Heat Island Mitigation

    NASA Technical Reports Server (NTRS)

    Estes, Maury; Luvall, Jeffrey

    1999-01-01

    This paper provides information on the characteristics of the urban heat island, research designed to provide the data needed to develop effective urban heat island reduction strategies, and the development of local working groups to develop implementation plans. As background, an overview of research results on the urban heat island phenomenon and the resultant effect on energy usage and air quality will be explored. The use of more reflective roofing materials, paving materials, tree planting, and other initiatives will be explored as a basis for strategies to mitigate urban heat islands and improve the urban environment. Current efforts to use aircraft remote sensing data in Atlanta, Baton Rouge, Sacramento, and Salt Lake City and our work with non-profit organizations designated to lead public education and strategic development efforts will be presented. Efforts to organize working groups comprised of key stakeholders, the process followed in communicating research results, and methodology for soliciting feedback and incorporating ideas into local plans, policies and decision-making will be discussed. Challenges in developing and transferring data products and research results to stakeholders will be presented. It is our ultimate goal that such efforts be integrated into plans and/or decision models that encourage sustainable development.

  1. Designing the Online Collaboratory for the Global Social Benefit Incubator

    ERIC Educational Resources Information Center

    Hernandez-Ramos, Pedro; Koch, James L.; Bruno, Albert; Carlson, Eric

    2007-01-01

    Pedro Hernandez-Ramos, James L. Koch, Albert Bruno, and Eric Carlson describe the online collaboratory planned for the Global Social Benefit Incubator (GSBI), an international education program designed to serve social benefit entrepreneurs working in the fields of education, health, economic development, the environment, and equality around the…

  2. Using Evaluation and Research Theory to Improve Programs in Applied Settings: An Interview with Thomas D. Cook.

    ERIC Educational Resources Information Center

    Buescher, Thomas M.

    1986-01-01

    An interview with T. Cook, author of works on the use of research and evaluation theory and design, touches on such topics as practical evaluation, planning programs with evaluation or research design, and evaluation of programs for gifted students. (CL)

  3. The Blueprint for Life/Work Designs.

    ERIC Educational Resources Information Center

    Jarvis, Phil; Richardt, Joan

    The "Blueprint" is a common framework of career development competencies that students and adults anywhere in Canada or the United States need to master in order to be successful and self-reliant in planning and managing their careers in a rapidly changing, knowledge-age labor market. A practical resource designed for career…

  4. Revisiting Your Outdoor Environment: Reasons to Reshape, Enrich, Redevelop the Outdoor Space.

    ERIC Educational Resources Information Center

    Mauffette, Anne Gillain

    1998-01-01

    Provides suggestions for designing effective outdoor space. Focuses on advocating for space, designing spaces based on children's characteristics and preferences, integrating the outdoors in educational planning, including children in decision making and work, knowing about injury prevention, providing adult models who love the outdoors, and…

  5. Sam Roach | NREL

    Science.gov Websites

    intern in the Integrated Applications Center working on analysis of and planning for the Race to Zero student design competition. Research Interests Zero-energy buildings Wind energy technological development

  6. Mobile Launch Platform Vehicle Assembly Area (SWMU 056) Biosparge Expansion Interim Measures Work Plan

    NASA Technical Reports Server (NTRS)

    Burcham, Michael S.; Daprato, Rebecca C.

    2016-01-01

    This document presents the design details for an Interim Measure (IM) Work Plan (IMWP) for the Mobile Launch Platform/Vehicle Assembly Building (MLPV) Area, located at the John F. Kennedy Space Center (KSC), Florida. The MLPV Area has been designated Solid Waste Management Unit Number 056 (SWMU 056) under KSC's Resource Conservation and Recovery Act (RCRA) Corrective Action Program. This report was prepared by Geosyntec Consultants (Geosyntec) for the National Aeronautics and Space Administration (NASA) under contract number NNK09CA02B and NNK12CA13B, project control number ENV1642. The Advanced Data Package (ADP) presentation covering the elements of this IMWP report received KSC Remediation Team (KSCRT) approval at the December 2015 Team Meeting; the meeting minutes are included in Appendix A.

  7. Teacher Professional Development to Foster Authentic Student Research Experiences

    NASA Astrophysics Data System (ADS)

    Conn, K.; Iyengar, E.

    2004-12-01

    This presentation reports on a new teacher workshop design that encourages teachers to initiate and support long-term student-directed research projects in the classroom setting. Teachers were recruited and engaged in an intensive marine ecology learning experience at Shoals Marine Laboratory, Appledore Island, Maine. Part of the weeklong summer workshop was spent in field work, part in laboratory work, and part in learning experimental design and basic statistical analysis of experimental results. Teachers were presented with strategies to adapt their workshop learnings to formulate plans for initiating and managing authentic student research projects in their classrooms. The authors will report on the different considerations and constraints facing the teachers in their home school settings and teachers' progress in implementing their plans. Suggestions for replicating the workshop will be offered.

  8. Mission Operations of the Mars Exploration Rovers

    NASA Technical Reports Server (NTRS)

    Bass, Deborah; Lauback, Sharon; Mishkin, Andrew; Limonadi, Daniel

    2007-01-01

    A document describes a system of processes involved in planning, commanding, and monitoring operations of the rovers Spirit and Opportunity of the Mars Exploration Rover mission. The system is designed to minimize command turnaround time, given that inherent uncertainties in terrain conditions and in successful completion of planned landed spacecraft motions preclude planning of some spacecraft activities until the results of prior activities are known by the ground-based operations team. The processes are partitioned into those (designated as tactical) that must be tied to the Martian clock and those (designated strategic) that can, without loss, be completed in a more leisurely fashion. The tactical processes include assessment of downlinked data, refinement and validation of activity plans, sequencing of commands, and integration and validation of sequences. Strategic processes include communications planning and generation of long-term activity plans. The primary benefit of this partition is to enable the tactical portion of the team to focus solely on tasks that contribute directly to meeting the deadlines for commanding the rover s each sol (1 sol = 1 Martian day) - achieving a turnaround time of 18 hours or less, while facilitating strategic team interactions with other organizations that do not work on a Mars time schedule.

  9. Coal gasification systems engineering and analysis, volume 2

    NASA Technical Reports Server (NTRS)

    1980-01-01

    The major design related features of each generic plant system were characterized in a catalog. Based on the catalog and requirements data, approximately 17 designs and cost estimates were developed for MBG and alternate products. A series of generic trade studies was conducted to support all of the design studies. A set of cost and programmatic analyses were conducted to supplement the designs. The cost methodology employed for the design and sensitivity studies was documented and implemented in a computer program. Plant design and construction schedules were developed for the K-T, Texaco, and B&W MBG plant designs. A generic work breakdown structure was prepared, based on the K-T design, to coincide with TVA's planned management approach. An extensive set of cost sensitivity analyses was completed for K-T, Texaco, and B&W design. Product price competitiveness was evaluated for MBG and the alternate products. A draft management policy and procedures manual was evaluated. A supporting technology development plan was developed to address high technology risk issues. The issues were identified and ranked in terms of importance and tractability, and a plan developed for obtaining data or developing technology required to mitigate the risk.

  10. Implementing Problem-Solving Techniques in an Urban Central Office Department by Establishing Teams and Infusing TQM Concepts.

    ERIC Educational Resources Information Center

    Smith, Jewell R.

    This practicum is designed to assist central office personnel in evaluating the work environment for better coordination to accomplish work, plan for a change effort, and implement a participatory change initiative. The work setting involved a K-12 urban school district (193 schools) containing 431 central-office administrators and more than…

  11. Preservice and Inservice Teachers' Challenges in the Planning of Practical Work in Physics

    ERIC Educational Resources Information Center

    Nivalainen, Ville; Asikainen, Mervi A.; Sormunen, Kari; Hirvonen, Pekka E.

    2010-01-01

    Practical work in school science plays many essential roles that have been discussed in the literature. However, less attention has been paid to how teachers learn the different roles of practical work and to the kind of challenges they face in their learning during laboratory courses designed for teachers. In the present study we applied the…

  12. Cedar-a large scale multiprocessor

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Gajski, D.; Kuck, D.; Lawrie, D.

    1983-01-01

    This paper presents an overview of Cedar, a large scale multiprocessor being designed at the University of Illinois. This machine is designed to accommodate several thousand high performance processors which are capable of working together on a single job, or they can be partitioned into groups of processors where each group of one or more processors can work on separate jobs. Various aspects of the machine are described including the control methodology, communication network, optimizing compiler and plans for construction. 13 references.

  13. Reengineering the Project Design Process

    NASA Technical Reports Server (NTRS)

    Casani, E.; Metzger, R.

    1994-01-01

    In response to NASA's goal of working faster, better and cheaper, JPL has developed extensive plans to minimize cost, maximize customer and employee satisfaction, and implement small- and moderate-size missions. These plans include improved management structures and processes, enhanced technical design processes, the incorporation of new technology, and the development of more economical space- and ground-system designs. The Laboratory's new Flight Projects Implementation Office has been chartered to oversee these innovations and the reengineering of JPL's project design process, including establishment of the Project Design Center and the Flight System Testbed. Reengineering at JPL implies a cultural change whereby the character of its design process will change from sequential to concurrent and from hierarchical to parallel. The Project Design Center will support missions offering high science return, design to cost, demonstrations of new technology, and rapid development. Its computer-supported environment will foster high-fidelity project life-cycle development and cost estimating.

  14. Evolution of Technical Writing in Senior Design--A Case History

    ERIC Educational Resources Information Center

    Gnanapragasam, Nirmala

    2010-01-01

    Seattle University has an industrially sponsored, yearlong, senior design program that has been in existence for more than 20 years. Students work in teams of three or four under the guidance of a liaison from the sponsoring agency and a faculty advisor. The students prepare a proposal in the fall quarter detailing their plan and a design report…

  15. Creating the Urban Village: Teaching Pre-Service Teachers about Sustainable Design in Architecture and Community Planning

    ERIC Educational Resources Information Center

    Vande Zande, Robin

    2010-01-01

    Sustainable design is a philosophy adopted by people concerned with the health of society and the natural environment. The practice of sustainable design works toward the improvement of the quality of the built environment, while reducing or eradicating the negative impact on the natural environment (McLennan 2004). It is a philosophical approach…

  16. Timing Is Everything.

    ERIC Educational Resources Information Center

    Brunner, Patrick M.; Shelley, Kevin D.

    2001-01-01

    In school construction projects a great deal of work and planning needs to happen before ground breaking starts. Lists consistent factors that should always be considered when setting up a facility-design timeline. (MLF)

  17. Developing models of how cognitive improvements change functioning: Mediation, moderation and moderated mediation

    PubMed Central

    Wykes, Til; Reeder, Clare; Huddy, Vyv; Taylor, Rumina; Wood, Helen; Ghirasim, Natalia; Kontis, Dimitrios; Landau, Sabine

    2012-01-01

    Background Cognitive remediation (CRT) affects functioning but the extent and type of cognitive improvements necessary are unknown. Aim To develop and test models of how cognitive improvement transfers to work behaviour using the data from a current service. Method Participants (N49) with a support worker and a paid or voluntary job were offered CRT in a Phase 2 single group design with three assessments: baseline, post therapy and follow-up. Working memory, cognitive flexibility, planning and work outcomes were assessed. Results Three models were tested (mediation — cognitive improvements drive functioning improvement; moderation — post treatment cognitive level affects the impact of CRT on functioning; moderated mediation — cognition drives functioning improvements only after a certain level is achieved). There was evidence of mediation (planning improvement associated with improved work quality). There was no evidence that cognitive flexibility (total Wisconsin Card Sorting Test errors) and working memory (Wechsler Adult Intelligence Scale III digit span) mediated work functioning despite significant effects. There was some evidence of moderated mediation for planning improvement if participants had poorer memory and/or made fewer WCST errors. The total CRT effect on work quality was d = 0.55, but the indirect (planning-mediated CRT effect) was d = 0.082 Conclusion Planning improvements led to better work quality but only accounted for a small proportion of the total effect on work outcome. Other specific and non-specific effects of CRT and the work programme are likely to account for some of the remaining effect. This is the first time complex models have been tested and future Phase 3 studies need to further test mediation and moderated mediation models. PMID:22503640

  18. How to Plan and Carry Out a Successful Public Awareness Program on Child Abuse and Neglect.

    ERIC Educational Resources Information Center

    National Center on Child Abuse and Neglect (DHEW/OHD), Washington, DC.

    Intended for public and private agencies working in the field of child abuse and neglect prevention and treatment, the manual is designed to assist those responsible for creating public understanding of the problem of child abuse and neglect. Chapters cover the following areas: the value of a public relations program; planning and budgeting a…

  19. Holding Accountability to Account: How Scholarship and Experience in Other Fields Inform Exploration of Performance Incentives in Education. Working Paper 2008-04

    ERIC Educational Resources Information Center

    Rothstein, Richard

    2008-01-01

    Accountability and performance incentive plans in education are compromised by goal distortion, gaming, and corruption. Education policy makers who design such plans have paid insufficient attention to similar experiences in other fields. This paper describes institutions in health care, job training and welfare administration, and in the private…

  20. Joint Venture Marketing Training: Development Marketing Plans Utilizing Foreign and American Students.

    ERIC Educational Resources Information Center

    Steele, David; Jones, Kevin

    This paper describes a workshop prepared and presented by the Business Administration Department of the University of Wisconsin-Eau Claire, that is designed to provide training in evaluating a European market for an American product and preparing a plan for marketing the product in Europe. It is noted that the program can work with both students…

  1. System analysis study of space platform and station accommodations for life sciences research facilities. Volume 1: Executive summary. Phase A: Conceptual design and programmatics

    NASA Technical Reports Server (NTRS)

    1985-01-01

    The study was conducted in 3 parts over a 3 year period. The study schedule and the documentation associated with each study part is given. This document summarized selected study results from the conceptual design and programmatics segment of the effort. The objectives were: (1) to update requirements and tradeoffs and develop a detailed design and mission requirements document; (2) to develop conceptual designs and mission descriptions; and (3) to develop programmatic, i.e., work breakdown structure and work breakdown structure dictionary, estimated cost, and implementing plans and schedules.

  2. How Home Health Nurses Plan Their Work Schedules: A Qualitative Descriptive Study.

    PubMed

    Irani, Elliane; Hirschman, Karen B; Cacchione, Pamela Z; Bowles, Kathryn H

    2018-06-12

    To describe how home health nurses plan their daily work schedules and what challenges they face during the planning process. Home health nurses are viewed as independent providers and value the nature of their work because of the flexibility and autonomy they hold in developing their work schedules. However, there is limited empirical evidence about how home health nurses plan their work schedules, including the factors they consider during the process and the challenges they face within the dynamic home health setting. Qualitative descriptive design. Semi-structured interviews were conducted with 20 registered nurses who had greater than 2 years of experience in home health and were employed by one of the three participating home health agencies in the mid-Atlantic region of the United States. Data were analyzed using conventional content analysis. Four themes emerged about planning work schedules and daily itineraries: identifying patient needs to prioritize visits accordingly, partnering with patients to accommodate their preferences, coordinating visit timing with other providers to avoid overwhelming patients, and working within agency standards to meet productivity requirements. Scheduling challenges included readjusting the schedule based on patient needs and staffing availability, anticipating longer visits, and maintaining continuity of care with patients. Home health nurses make autonomous decisions regarding their work schedules while considering specific patient and agency factors, and overcome challenges related to the unpredictable nature of providing care in a home health setting. Future research is needed to further explore nurse productivity in home health and improve home health work environments. Home health nurses plan their work schedules to provide high quality care that is patient-centered and timely. The findings also highlight organizational priorities to facilitate continuity of care and support nurses while alleviating the burnout associated with high productivity requirements. This article is protected by copyright. All rights reserved. This article is protected by copyright. All rights reserved.

  3. PNNL Apatite Investigation at 100-NR-2 Quality Assurance Project Plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Fix, N. J.

    In 2004, the U.S. Department of Energy, Fluor Hanford, Inc., Pacific Northwest National Laboratory (PNNL), and the Washington Department of Ecology agreed that the long-term strategy for groundwater remediation at the 100-N Area would include apatite sequestration as the primary treatment, followed by a secondary treatment if necessary. Since then, the agencies have worked together to agree on which apatite sequestration technology has the greatest chance of reducing strontium-90 flux to the Columbia River. This Quality Assurance Project Plan provides the quality assurance requirements and processes that will be followed by staff working on the PNNL Apatite Investigation at 100-NR-2more » Project. The plan is designed to be used exclusively by project staff.« less

  4. Task planning and control synthesis for robotic manipulation in space applications

    NASA Technical Reports Server (NTRS)

    Sanderson, A. C.; Peshkin, M. A.; Homem-De-mello, L. S.

    1987-01-01

    Space-based robotic systems for diagnosis, repair and assembly of systems will require new techniques of planning and manipulation to accomplish these complex tasks. Results of work in assembly task representation, discrete task planning, and control synthesis which provide a design environment for flexible assembly systems in manufacturing applications, and which extend to planning of manipulatiuon operations in unstructured environments are summarized. Assembly planning is carried out using the AND/OR graph representation which encompasses all possible partial orders of operations and may be used to plan assembly sequences. Discrete task planning uses the configuration map which facilitates search over a space of discrete operations parameters in sequential operations in order to achieve required goals in the space of bounded configuration sets.

  5. Handling Office Politics. [Second Edition.

    ERIC Educational Resources Information Center

    Stevens, Paul

    This book is designed to help people develop an action plan to enhance their situation at work. Part 1 focuses on political behavior at work as a key to advancement. It discusses assessing career setbacks and recovery from them. Subsequent sections focus on the following areas of self-study that are necessary to enable the individual to manage…

  6. A System to Enable the Blind to Work Independently on the Center Lathe.

    ERIC Educational Resources Information Center

    Guha, Sujoy K.; Anand, Sneh

    1980-01-01

    A study has shown that with suitable accessories to machines and appropriate work planning, totally blind machinists can perform varied tasks on a lathe independently. Based on the results of the study, simple accessories have been designed and tested for use with the center lathe. (Author/PHR)

  7. Phase-Division-Based Dynamic Optimization of Linkages for Drawing Servo Presses

    NASA Astrophysics Data System (ADS)

    Zhang, Zhi-Gang; Wang, Li-Ping; Cao, Yan-Ke

    2017-11-01

    Existing linkage-optimization methods are designed for mechanical presses; few can be directly used for servo presses, so development of the servo press is limited. Based on the complementarity of linkage optimization and motion planning, a phase-division-based linkage-optimization model for a drawing servo press is established. Considering the motion-planning principles of a drawing servo press, and taking account of work rating and efficiency, the constraints of the optimization model are constructed. Linkage is optimized in two modes: use of either constant eccentric speed or constant slide speed in the work segments. The performances of optimized linkages are compared with those of a mature linkage SL4-2000A, which is optimized by a traditional method. The results show that the work rating of a drawing servo press equipped with linkages optimized by this new method improved and the root-mean-square torque of the servo motors is reduced by more than 10%. This research provides a promising method for designing energy-saving drawing servo presses with high work ratings.

  8. NASA's Radioisotope Power Systems - Plans

    NASA Technical Reports Server (NTRS)

    Hamley, John A.; Mccallum, Peter W.; Sandifer, Carl E., II; Sutliff, Thomas J.; Zakrajsek, June F.

    2015-01-01

    NASA's Radioisotope Power Systems (RPS) Program continues to plan and implement content to enable planetary exploration where such systems could be needed, and to prepare more advanced RPS technology for possible infusion into future power systems. The 2014-2015 period saw significant changes, and strong progress. Achievements of near-term objectives have enabled definition of a clear path forward in which payoffs from research investments and other sustaining efforts can be applied. The future implementation path is expected to yield a higher-performing thermoelectric generator design, a more isotope-fuel efficient system concept design, and a robust RPS infrastructure maintained effectively within both NASA and the Department of Energy. This paper describes recent work with an eye towards the future plans that result from these achievements.

  9. 2011 Annual Report of the American Psychological Association

    ERIC Educational Resources Information Center

    American Psychologist, 2012

    2012-01-01

    As we have throughout the association's history, we focused in 2011 on multiple initiatives--all designed to further, support, and communicate the important work that psychologists do. This year we had the benefit of APA's first-ever strategic plan as well as funding for the following seven initiatives that are specifically designed to execute the…

  10. Community Design and Transportation Policies: New Ways To Promote Physical Activity.

    ERIC Educational Resources Information Center

    Killingsworth, Richard E.; Schmid, Thomas L.

    2001-01-01

    Public health, city planning, and transportation officials can work toward reducing the public health burden of physical inactivity by promoting the integration of walking and bicycling into daily routines. The paper discusses urban design challenges, promotion of walking and bicycling, and the importance of physical activity for children.…

  11. OECD Work on Future Educational Environments

    ERIC Educational Resources Information Center

    Theisens, Henno; Benavides, Francisco; Dumont, Hanna

    2008-01-01

    Designing school buildings to respond to change is not a new idea. But perhaps what is different today is the kind and degree of change which we have to anticipate. The OECD is carrying out projects that can help in the planning and design of future educational facilities--exploring trends in education and studying innovative learning…

  12. THE DESIGN OF A MAN-MACHINE COUNSELING SYSTEM. A PROFESSIONAL PAPER.

    ERIC Educational Resources Information Center

    COGSWELL, J.F.; AND OTHERS

    TWO PROJECTS ON THE DESIGN, DEVELOPMENT, IMPLEMENTATION, AND EVALUATION OF A MAN-MACHINE SYSTEM FOR COUNSELING IN THE PALO ALTO AND LOS ANGELES SCHOOL DISTRICTS ARE REPORTED. THE EARLIER PHILCO 2000 COMPUTER PROGRAMS SIMULATED A COUNSELOR'S WORK IN THE EDUCATIONAL PLANNING INTERVIEW BY ACCEPTING INPUTS SUCH AS SCHOOL GRADES, TEST SCORES, AND…

  13. Designing Project-Based Courses with a Focus on Group Formation and Assessment

    ERIC Educational Resources Information Center

    Richards, Debbie

    2009-01-01

    The value and the pitfalls of project and group work are well recognized. The principles and elements which apply to projects in general, apply to project-based courses. Thoughtful and detailed planning, understanding of the stakeholders and their needs, a good design, appropriate testing, monitoring and quality control and continual management…

  14. Design of the optical backscatter diagnostic for laser plasma interaction measurements on NIF

    NASA Astrophysics Data System (ADS)

    Moody, J. D.; Datte, P.; Ng, E.; Maitland, K.; Hsing, W.; MacGowan, B. J.; Froula, D. H.; Neumayer, P.; Sutter, L.; Meezan, N.; Glenzer, S. H.; Kirkwood, R. K.; Divol, L.; Andrews, S.; Jackson, J.; MacKinnon, A.; Jovanovic, I.; Beeler, R.; Bertolini, L.; Landon, M.; Alvarez, S.; Lee, T.; Watts, P.

    2007-11-01

    We describe the design of the backscatter diagnostic for NIF laser-plasma interaction (LPI) studies. It will initially be used to validate the 280 eV point design hohlraum and select phase plates for the ignition experiments. Backscatter measurements are planned for two separate groups of 4 beams (a quad). One quad is 30^o from the hohlraum axis and the other at 50^o. The backscatter measurement utilizes 2 instruments for each beam quad. The full aperture backscatter system (FABS) measures light backscattered into the final focus lens of each beam in the quad. The near backscatter imager (NBI) measures light backscattered outside of the beam quad. Both instruments must work in conjunction to provide spectrally and temporally resolved backscatter power. We describe the design of the diagnostic and its capabilities as well as plans for calibrating it and analyzing the resulting data. This work was performed under the auspices of the U.S. Department of Energy by University of California, Lawrence Livermore National Laboratory under Contract W-7405-Eng-48.

  15. The role of locally-designed organizational artifacts in supporting nurses’ work: an ethnographic study on the wards

    PubMed

    Talamo, Alessandra; Mellini, Barbara; Barbieri, Barbara

    2017-01-01

    This paper aims to describe how nurses' planning and coordination work is performed through the use of locally designed tools (i.e., diaries, planners, reminders, and organizers). These tools are investigated as the materialization of organizational work, thus offering a complementary perspective on nursing practice to that proposed by the professional mandate and supported by official artifacts in use. Ethnographic study. By analyzing locally designed artifacts, the rationale that enables nurses to make the flow of activities work is highlighted and explained. Evidence is provided by a description of how nurses' tacit knowledge is reified and embedded into objects produced by the nurses themselves. Implications for the design of digital systems supporting nursing practice are discussed. The analysis of these artifacts has allowed an understanding of practices used by the nurses to manage the workflow in the wards.

  16. Final definition and preliminary design study for the initial atmospheric cloud physics laboratory, a Spacelab mission payload

    NASA Technical Reports Server (NTRS)

    1976-01-01

    The following areas related to the final definition and preliminary design study of the initial atmospheric cloud physics laboratory (ACPL) were covered: (1) proposal organization, personnel, schedule, and project management, (2) proposed configurations, (3) study objectives, (4) ACPL experiment program listing and description, (5) mission/flight flexibility and modularity/commonality, (6) study plan, and (7) description of following tasks: requirement analysis and definition task flow, systems analysis and trade studies, subsystem analysis and trade studies, specifications and interface control documents, preliminary design task flow, work breakdown structure, programmatic analysis and planning, and project costs. Finally, an overview of the scientific requirements was presented.

  17. The implementation of the integrated design process in the hole-plan system

    NASA Astrophysics Data System (ADS)

    Ruy, Won-Sun; Ko, Dae-Eun; Yang, Young-Soon

    2012-12-01

    All current shipyards are using the customized CAD/CAM programs in order to improve the design quality and increase the design efficiency. Even though the data structures for ship design and construction are almost completed, the implementation related to the ship design processes are still in progress so that it has been the main causes of the bottleneck and delay during the middle of design process. In this study, we thought that the hole-plan system would be a good example which is remained to be improved. The people of outfitting division who don't have direct authority to edit the structural panels, should request the hull design division to install the holes for the outfitting equipment. For acceptance, they should calculate the hole position, determine the hole type, and find the intersected contour of panel. After consideration of the hull people, the requested holes are manually installed on the hull structure. As the above, many processes are needed such as communication and discussion between the divisions, drawings for hole-plan, and the consideration for the structural or production compatibility. However this iterative process takes a lot of working time and requires mental pressure to the related people and cross-division conflict. This paper will handle the hole-plan system in detail to automate the series of process and minimize the human efforts and time-consumption.

  18. Plans and Considerations for the Exploration of Space

    NASA Technical Reports Server (NTRS)

    Derkowski, Brian J.

    2001-01-01

    The Mars Settlement Design Competition is a program for high school students and teachers to experience the process of mission and hardware design. It provides a top level view into how NASA plans to explore space. I will be involved with all three days of this competition. On Friday I plan to give two presentations, one to the employees of White Sands Test Facility and one to students and teachers. On Saturday, I will have a question and answer session with some of the teachers participating in the workshop. Sunday I will serve as one of the judges that will review the students projects created over the weekend. The main emphasis of my talk will focus on exploring the possibilities of the future of space exploration. I will discuss the Mars Reference Mission 3.0, as well as some of the current robotic missions being sent to Mars. Next, I will present a business model perfected by Hum Mandell, showing how the public, private, and commercial sectors all play a major role in sending humans to Mars. I will also discuss the work of the Integrated Design Team at JSC and how that working together approach is key for a successful design. Finally, I will present that the question of how humans can reach out beyond low earth orbit and place permanent settlements on Mars is really a function of the imagination of those who intend on going there.

  19. How State-Funded Home Care Programs Respond to Changes in Medicare Home Health Care: Resource Allocation Decisions on the Front Line

    PubMed Central

    Corazzini, Kirsten

    2003-01-01

    Objective To examine how case managers in a state-funded home care program allocate home care services in response to information about a client's Medicare home health care status, with particular attention to the influence of work environment. Data Sources/Study Setting Primary data collected on 355 case managers and 26 agency directors employed in June 1999 by 26 of the 27 regional agencies administering the Massachusetts Home Care Program for low-income elders. Study Design Data were collected in a cross-sectional survey study design. A case manager survey included measures of work environment, demographics, and factorial survey vignette clients (N=2,054), for which case managers assessed service eligibility levels. An agency director survey included measures of management practices. Data Collection/Extraction Methods Hierarchical linear models estimated the effects of work environment on the relationship between client receipt of Medicare home health care and care plan levels while controlling for case-mix differences in agencies' clients. Principal Findings Case managers did not supplement extant Medicare home health services, but did allocate more generous service plans to clients who have had Medicare home health care services recently terminated. This finding persisted when controlling for case mix and did not vary by work environment. Work environment affected overall care plan levels. Conclusions Study findings indicate systematic patterns of frontline resource allocation shaping the relationships among community-based long-term care payment sources. Further, results illustrate how nonuniform implementation of upper-level initiatives may be partially attributed to work environment characteristics. PMID:14596390

  20. Inclusive Smartphone Interface Design in Context: Co(Re)designing the PIS.

    PubMed

    Magee, Paul; Ward, Gillian; Moody, Louise; Roebuck, Annette

    2017-01-01

    User-context optimises smartphone interface-design. Neglect of user-context during development, delays or prevents marginalised-consumer benefit. Working with People with Learning Disability (PWLD) to develop interfaces refined by communication-need will improve User-Experience (UX). In research, a Participant Information Sheet (PIS) discloses planned study-activity. This paper explains co-creation of a PIS based on communication-need of PWLD.

  1. Nanotechnology-Enabled Optical Molecular Imaging of Breast Cancer

    DTIC Science & Technology

    2008-07-01

    explanation of results. 37 KEY RESEACH ACCOMPLISHMENTS • Design of needle-based fiber optic imaging system completed and development of first...policy or decision unless so designated by other documentation. REPORT DOCUMENTATION PAGE Form Approved OMB No. 0704-0188 Public reporting...our results to date. As described in the Statement of Work, Year 1 plans focused on design of this system and beginning initial construction. It

  2. A Planned Preventive Maintenance Program. A Handbook for Chief Business Officers and Supervisors of Maintenance with Suggestions on Maintenance for Consideration by Presidents of Higher Institutions.

    ERIC Educational Resources Information Center

    Daniel, Clarence H.

    This handbook explains planned preventive maintenance program, which is an operational system of maintenance designed to increase the effectiveness of the maintenance staff and the use of maintenance funds through efficient scheduling of inspections and follow-through of work to be performed. Sections are included for the chief administrative…

  3. Using Self-Awareness Techniques (COPS) in Conjunction with a Career Information System (MetroGuide) to Facilitate the Career Planning Process.

    ERIC Educational Resources Information Center

    Staton, John L.

    A program in career planning was designed for disadvantaged New York City high school students who had experienced problems in attendance, punctuality, and relationships with others. Its goal was to increase student's self awareness of interests, aptitudes, abilities, and values in relationship to the world of work. Twenty-four Black and Hispanic…

  4. A Comparative Study of Family Planning Service Statistics Systems in the ESCAP Region. Asian Population Studies Series No. 15.

    ERIC Educational Resources Information Center

    United Nations Economic and Social Commission for Asia and the Pacific, Bangkok (Thailand).

    This monograph contains a study conducted by the Population Division of the United Nations Economic and Social Committee for Asia and the Pacific (ESCAP). The document is designed to aid policy-makers, administrators and evaluation personnel in family planning programs in the ESCAP region, primarily; and researchers working in the field of family…

  5. Network speech systems technology program

    NASA Astrophysics Data System (ADS)

    Weinstein, C. J.

    1981-09-01

    This report documents work performed during FY 1981 on the DCA-sponsored Network Speech Systems Technology Program. The two areas of work reported are: (1) communication system studies in support of the evolving Defense Switched Network (DSN) and (2) design and implementation of satellite/terrestrial interfaces for the Experimental Integrated Switched Network (EISN). The system studies focus on the development and evaluation of economical and endurable network routing procedures. Satellite/terrestrial interface development includes circuit-switched and packet-switched connections to the experimental wideband satellite network. Efforts in planning and coordination of EISN experiments are reported in detail in a separate EISN Experiment Plan.

  6. Visit from JAXA to NASA MSFC: The Engines Element & Ideas for Collaboration

    NASA Technical Reports Server (NTRS)

    Greene, William D.

    2013-01-01

    System Design, Development, and Fabrication: Design, develop, and fabricate or procure MB-60 component hardware compliant with the imposed technical requirements and in sufficient quantities to fulfill the overall MB-60 development effort. System Development, Assembly, and Test: Manage the scope of the development, assembly, and test-related activities for MB-60 development. This scope includes engine-level development planning, engine assembly and disassembly, test planning, engine testing, inspection, anomaly resolution, and development of necessary ground support equipment and special test equipment. System Integration: Provide coordinated integration in the realms of engineering, safety, quality, and manufacturing disciplines across the scope of the MB-60 design and associated products development Safety and Mission Assurance, structural design, fracture control, materials and processes, thermal analysis. Systems Engineering and Analysis: Manage and perform Systems Engineering and Analysis to provide rigor and structure to the overall design and development effort for the MB-60. Milestone reviews, requirements management, system analysis, program management support Program Management: Manage, plan, and coordinate the activities across all portions of the MB-60 work scope by providing direction for program administration, business management, and supplier management.

  7. Biourbanism: Solar based urban and regional design

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Williams, D.

    1999-07-01

    New neighborhoods for an additional one billion people will need to be constructed on the planet within the next 10 years. If the historic patterns of growth continue--the sprawl, the congestion, the draining of swamps, the loss of agricultural land--the requirement for all basic resources will outstrip the availability. While this is of great concern, it is the destruction of an acceptable quality of life--the sense of place--that will be the most difficult and expensive to change. An essential step to reverse the direction of this undesirable future is changing the design and planning of these communities to work withmore » resident solar energies, regional biology, local renewable resources, and sustainable urban planning and design principles. Design can make a difference. This paper develops the view that the solar approach must include urban and regional design and presents solar-based renewable resources example of the design of regions.« less

  8. Fuzzy logic based expert system for the treatment of mobile tooth.

    PubMed

    Mago, Vijay Kumar; Mago, Anjali; Sharma, Poonam; Mago, Jagmohan

    2011-01-01

    The aim of this research work is to design an expert system to assist dentist in treating the mobile tooth. There is lack of consistency among dentists in choosing the treatment plan. Moreover, there is no expert system currently available to verify and support such decision making in dentistry. A Fuzzy Logic based expert system has been designed to accept imprecise and vague values of dental sign-symptoms related to mobile tooth and the system suggests treatment plan(s). The comparison of predictions made by the system with those of the dentist is conducted. Chi-square Test of homogeneity is conducted and it is found that the system is capable of predicting accurate results. With this system, dentist feels more confident while planning the treatment of mobile tooth as he can verify his decision with the expert system. The authors also argue that Fuzzy Logic provides an appropriate mechanism to handle imprecise values of dental domain.

  9. Visualisation and interaction design solutions to address specific demands in shared home care.

    PubMed

    Scandurra, Isabella; Hägglund, Maria; Koch, Sabine

    2006-01-01

    When care professionals from different organisations are involved in patient care, their different views on the care process may not be meaningfully integrated. To use visualisation and interaction design solutions addressing the specific demands of shared care in order to support a collaborative work process. Participatory design, comprising interdisciplinary seminar series with real users and iterative prototyping, was applied. A set of interaction and visualisation design solutions to address care professionals' requirements in shared home care is presented, introducing support for identifying origin of information, holistic presentation of information, user group specific visualisation, avoiding cognitive overload, coordination of work and planning, and quick overviews. The design solutions are implemented in an integrated virtual health record system supporting cooperation and coordination in shared home care for the elderly. The described requirements are, however, generalized to comprise all shared care work. The presented design considerations allow healthcare professionals in different organizations to share patient data on mobile devices. Visualization and interaction design facilitates specific work situations and assists in handling specific demands in shared care. The user interface is adapted to different user groups with similar yet distinct needs. Consequently different views supporting cooperative work and presenting shared information in holistic overviews are developed.

  10. Remedial Design/Remedial Action Work Plan for Operable Units 6-05 and 10-04, Phase IV

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    R. P. Wells

    2006-11-14

    This Phase IV Remedial Design/Remedial Action Work Plan addresses the remediation of areas with the potential for UXO at the Idaho National Laboratory. These areas include portions of the Naval Proving Ground, the Arco High-Altitude Bombing Range, and the Twin Buttes Bombing Range. Five areas within the Naval Proving Ground that are known to contain UXO include the Naval Ordnance Disposal Area, the Mass Detonation Area, the Experimental Field Station, The Rail Car Explosion Area, and the Land Mine Fuze Burn Area. The Phase IV remedial action will be concentrated in these five areas. For other areas, such as themore » Arco High-Altitude Bombing Range and the Twin Buttes Bombing Range, ordnance has largely consisted of sand-filled practice bombs that do not pose an explosion risk. Ordnance encountered in these areas will be addressed under the Phase I Operations and Maintenance Plan that allows for the recovery and disposal of ordnance that poses an imminent risk to human health or the environment.« less

  11. Exploring the Impact of a Dual Occupancy Neonatal Intensive Care Unit on Staff Workflow, Activity, and Their Perceptions.

    PubMed

    Broom, Margaret; Kecskes, Zsuzsoka; Kildea, Sue; Gardner, Anne

    2018-01-01

    In 2012, a tertiary neonatal intensive care unit (NICU) transitioned from an open plan (OP) to a dual occupancy (DO) NICU. The DO design aimed to provide a developmental appropriate, family-centered environment for neonates and their families. During planning, staff questioned the impact DO would have on staff workflow and activity. To explore the impact of changing from an OP to a DO NICU, a prospective longitudinal study was undertaken from 2011 to 2014, using observational, time and motion, and surveys methods. Main outcome measures included distance walked by staff, minutes of staff activity, and staff perceptions of the DO design. Results highlighted no significant difference in the distances clinical nurses walked nor time spent providing direct clinical care, whereas technical support staff walked further than other staff in both designs. Staff perceived the DO design created a developmentally appropriate, family-centered environment that facilitated communication and collaboration between staff and families. Staff described the main challenges of the DO design such as effective staff communication, gaining educational opportunities, and the isolation of staff and families compared to the OP design. Our study provides new evidence that DO provides an improved developmentally environment and has similar positive benefits to single-family room for neonates and families. Such design may reduce the larger floor plan's impact on staff walking distance and work practices. Challenges of staff transition can be minimized by planning and leadership throughout the development and move to a new design.

  12. Design and dosimetry of a few leaf electron collimator for energy modulated electron therapy

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Al-Yahya, Khalid; Verhaegen, Frank; Seuntjens, Jan

    2007-12-15

    Despite the capability of energy modulated electron therapy (EMET) to achieve highly conformal dose distributions in superficial targets it has not been widely implemented due to problems inherent in electron beam radiotherapy such as planning dosimetry accuracy, and verification as well as a lack of systems for automated delivery. In previous work we proposed a novel technique to deliver EMET using an automated 'few leaf electron collimator' (FLEC) that consists of four motor-driven leaves fit in a standard clinical electron beam applicator. Integrated with a Monte Carlo based optimization algorithm that utilizes patient-specific dose kernels, a treatment delivery was incorporatedmore » within the linear accelerator operation. The FLEC was envisioned to work as an accessory tool added to the clinical accelerator. In this article the design and construction of the FLEC prototype that match our compact design goals are presented. It is controlled using an in-house developed EMET controller. The structure of the software and the hardware characteristics of the EMET controller are demonstrated. Using a parallel plate ionization chamber, output measurements were obtained to validate the Monte Carlo calculations for a range of fields with different energies and sizes. Further verifications were also performed for comparing 1-D and 2-D dose distributions using energy independent radiochromic films. Comparisons between Monte Carlo calculations and measurements of complex intensity map deliveries show an overall agreement to within {+-}3%. This work confirms our design objectives of the FLEC that allow for automated delivery of EMET. Furthermore, the Monte Carlo dose calculation engine required for EMET planning was validated. The result supports the potential of the prototype FLEC for the planning and delivery of EMET.« less

  13. What Is Substance Abuse Treatment? A Booklet for Families

    MedlinePlus

    ... program coun selors work with the person to design an effective treatment plan . Although clinical assessment continues ... emo tional problems such as depression, anxiety, or post traumatic stress disorder. Adolescents in treatment also may ...

  14. Ironbound Research Project

    DOT National Transportation Integrated Search

    2002-12-01

    The Infrastructure Design Lab of the New Jersey School of Architecture, with the assistance of NCTIP, is working with the Business Improvement District (BID) of the historic Ironbound section of Newark to study various plans that have been prepared f...

  15. Pedagogical Approaches to Cooperative Education in South Africa: A Work-Integrated Learning Model for the Public Relations Industry

    ERIC Educational Resources Information Center

    Rampersad, Renitha

    2010-01-01

    The pedagogy relevant to work-integrated learning (WIL) has formed a significant component of most educational processes and has become a necessity for the public relations industry in South Africa. Properly planned, designed and monitored programmes expose students to professional culture and workplace practice. This paper outlines the pedagogy…

  16. Role of Advisory Groups. Instructor Guide. Working for Clean Water: An Information Program for Advisory Committees.

    ERIC Educational Resources Information Center

    Pennsylvania State Univ., Middletown. Inst. of State and Regional Affairs.

    Presented is an instructor's manual for conducting a learning session about public participation in water quality planning. Participants in the session learn about the purpose, organization, and activities of citizen advisory groups. The manual, a component of the Working for Clean Water Project, is designed for use in conjunction with a…

  17. Responding to Individual Needs in Head Start: A Head Start Series on Needs Assessment. Part 1: Working with the Individual Child.

    ERIC Educational Resources Information Center

    Child Development Services Bureau (DHEW/OCD), Washington, DC. Project Head Start.

    This manual, designed for Head Start staff, parents, and others working with handicapped and/or nonhandicapped children, gives general background information on physical, emotional, and cognitive disabilities and offers practical suggestions for handling classroom problems related to these disabilities. Staff planning is discussed in relation to…

  18. A Proposal: The Circular School Year.

    ERIC Educational Resources Information Center

    Reeves, Robert L.

    A proposed plan outlined in this speech divides the school year into three instructional units of 12 weeks each during which time student attendance is required. Three interim units of 15 work days and five vacation days are scheduled in April, August, and December. These interim units are designed to be used by students for remedial work,…

  19. Career Exploration and Specialization: A New Training Design for Adult and Youth Work Experience. Concept Paper [and Synopsis].

    ERIC Educational Resources Information Center

    Spann, Jerry

    To address the Comprehensive Employment and Training Act (CETA) client's need for career development experience and skills, the Affirmative Action Office of Dane County (Wisconsin) and the Adult Work Experience Program (AWEP) staff plan to implement a year-long training program aimed at job exploration, internship, and personalized decision…

  20. Evaluating the Facilities Planning, Design, and Construction Department: The Capital Programs Management Audit.

    ERIC Educational Resources Information Center

    Kaiser, Harvey H.; Kirkwood, Dennis M.

    2000-01-01

    Presents a diagnostic model for assessing the state of an institution's capital programs management (CPM) by delineating "work processes" which comprise that function. What capital programs management is, its resources, and its phases and work processes are described, followed by case studies of the CPM Process Model as an assessment tool. (GR)

  1. From Welfare to Work: Lessons for ESL Learners.

    ERIC Educational Resources Information Center

    Green, Elaine

    This lesson plan guide is designed to be used by English-as-a-Second-Language (ESL) teachers to help their learners deal with new welfare legislation--Temporary Assistance to Needy Families (TANF)--and to prepare them for the world of work. Learners at the high beginner to low intermediate level and above will benefit from this instruction. All…

  2. The Best Laid Plans: Designing Incentive Programs for School Leaders. WCER Working Paper No. 2014-7

    ERIC Educational Resources Information Center

    Goff, Peter; Goldring, Ellen; Canney, Melissa

    2014-01-01

    Notable attention and effort has been directed toward improving educator productivity through the use of performance incentives. Little of this work has focused on incentive systems for school leaders (principals) and less yet examines performance pay systems used in practice. This research uses 34 funded grants from the federal Teacher Incentive…

  3. Metalworking Lathe; Machine Shop Work--Intermediate: 9555.03.

    ERIC Educational Resources Information Center

    Dade County Public Schools, Miami, FL.

    The course outline has been prepared as a guide to assist the instructor to plan systematically and to present meaningful lessons to provide the training needed by the machine shop student. This is the third course of instruction in a series of machine shop work courses. The six blocks of instruction contained in this outline are designed to…

  4. The Paper Beam: Hands-On Design for Team Work Experience of Freshman in Engineering

    ERIC Educational Resources Information Center

    Kalkani, Efrossini C.; Boussiakou, Iris K.; Boussiakou, Leda G.

    2005-01-01

    The present research refers to the assigning of a hands-on group project to freshman engineering students, evaluating their performance, and deriving conclusions on student benefits and educational advances. The research procedure included action plans for the instructor and the students, instructions to the students on performing the work,…

  5. Manned remote work station development article

    NASA Technical Reports Server (NTRS)

    1978-01-01

    Flight article and associated design concepts are evaluated to meet fundamental requirements of a universal crew cabin to be used as a construction cherrypicker, a space crane turret, a railed work station, or a free flyer. Key technology developments are embodied into a simulation program. A schedule and simulation test plan matrix is given for the open cabin cherry picker.

  6. Choices and Challenges: A Qualitative Exploration of Professional Women's Career Patterns

    ERIC Educational Resources Information Center

    Whitmarsh, Lona; Brown, Donalee; Cooper, Jane; Hawkins-Rodgers, Yolanda; Wentworth, Diane Keyser

    2007-01-01

    With the rapid changes occurring in the role of work in women's lives, this research project was designed to examine the career planning, career decision making, and work history of women in both female-dominated and gender-neutral careers (U.S. Department of Labor, n.d.-a). A qualitative analysis of structured interviews identified 6 emerging…

  7. Bench Work and Support Operations, Machine Shop Work--Intermediate: 9555.02.

    ERIC Educational Resources Information Center

    Dade County Public Schools, Miami, FL.

    The course outline has been prepared as a guide to assist the instructor to plan systematically and to present meaningful lessons programmed to meet the necessary training needed by the machine shop student who has completed an introductory course in machine tool technology. The five blocks of instruction contained in this outline are designed to…

  8. Astronaut Sam Gemar works with Middeck O-Gravity Dynamics Experiment (MODE)

    NASA Technical Reports Server (NTRS)

    1994-01-01

    Astronaut Charles D. (Sam) Gemar, mission specialist, works with the Middeck O-Gravity Dynamics Experiment (MODE) aboard the Earth-orbiting Space Shuttle Columbia. The reusable test facility is designed to study the nonlinear, gravity-dependent behavior of two types of space hardware - contained fluids and (as depicted here) large space structures - planned for future spacecraft.

  9. Astronaut Pierre J. Thuot works with Middeck O-Gravity Dynamics Experiment (MODE)

    NASA Technical Reports Server (NTRS)

    1994-01-01

    Astronaut Pierre J. Thuot, mission specialist, works with the Middeck O-Gravity Dynamics Experiment (MODE) aboard the Earth-orbiting Space Shuttle Columbia. The reusable test facility is designed to study the nonlinear, gravity-dependent behavior of two types of space hardware - contained fluids and (as depicted here) large space structures - planned for future spacecraft.

  10. Ecological Census Techniques - 2nd Edition

    NASA Astrophysics Data System (ADS)

    Sutherland, Edited By William J.

    2006-08-01

    This is an updated version of the best selling first edition, Ecological Census Techniques, with updating, some new chapters and authors. Almost all ecological and conservation work involves carrying out a census or survey. This practically focussed book describes how to plan a census, the practical details and shows with worked examples how to analyse the results. The first three chapters describe planning, sampling and the basic theory necessary for carrying out a census. In the subsequent chapters international experts describe the appropriate methods for counting plants, insects, fish, amphibians, reptiles, mammals and birds. As many censuses also relate the results to environmental variability, there is a chapter explaining the main methods. Finally, there is a list of the most common mistakes encountered when carrying out a census. Gives worked examples and describes practical details The chapter on research planning provides an approach for planning any research, not just those relating to census techniques Latest edition of a very highly-regarded book. Includes new authors, each chapter has been updated, and additional chapters on sampling and designing research programmes have been added

  11. Discussion and Reflection on Several Core Issues in the Grand Canal Heritage Conservation Planning Under the Background of Application for World Heritage

    NASA Astrophysics Data System (ADS)

    Yao, D.; Dai, D. S.; Tang, Y. Z.; Zhu, G. Y.; Chen, X.

    2015-08-01

    At the turn of the century, a series of new heritage concepts have appeared in the area of international cultural heritage protection, such as cultural landscape, cultural route, heritage corridor, heritage canal, which presents the development of people's recognition of cultural heritage. According to The Operational Guidelines for the Implementation of the World Heritage Convention, management planning must be contained in the material used to apply for world heritage. The State Administration of Cultural Heritage designed the mission and work schedule of China's Grand Canal conservation planning in 2008. This research will introduce the working system of China's Grand Canal conservation planning on three levels: city, province and nation. It will also summarize the characteristics of the core technologies in China's Grand Canal conservation planning, including key issues like the identification of the core characteristic of China's Grand Canal, value assessment and determination of the protection scope. Through reviewing, thinking and analyzing the previous accomplishments, the research will offer some advices for the similar world heritage conservation planning after.

  12. Environmental Implementation Plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1994-02-01

    The Environmental Implementation Plan (EIP) is a dynamic long-range environmental-protection plan for SRS. The EIP communicates the current and future (five year) environmental plans from individual organizations and divisions as well as site environmental initiatives which are designed to protect the environment and meet or exceed compliance with changing environmental/ regulatory requirements. Communication with all site organizations is essential for making the site environmental planning process work. Demonstrating environmental excellence is a high priority embodied in DOE and WSRC policy. Because of your support and participation in the three EIP initiatives; Reflections, Sectional Revision, and Integrated Planning, improvements are beingmore » made to the EIP and SRS environmental protection programs. I appreciate the ``Partnership in Environmental Excellence`` formed by the environmental coordinators and professionals who work daily toward our goal of compliance and environmental excellence. I look forward to seeing continued success and improvement in our environmental protection programs through combined efforts of all site organizations to protect our employees, the public health, and the environment. Together, we will achieve our site vision for SRS to be the recognized model for Environmental Excellence in the DOE Nuclear Weapons Complex.« less

  13. Environmental Implementation Plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1993-03-15

    The purpose of the Environmental Implementation Plan (EIP) is to show the current and future (five years) environmental plans from individual site organizations and divisions, as well as site environmental programs and initiatives which are designed to protect the environment and meet or exceed changing environmental/regulatory requirements. Communicating with site organizations, departments, and committees is essential in making the site`s environmental-planning process work. The EIP gives the site the what, when, how, and why for environmental requirements. Through teamwork and proactive planning, a partnership for environmental excellence is formed to achieve the site vision for SRS to become the recognizedmore » model for Environmental Excellence in the Department of Energy`s Nuclear Weapons Complex.« less

  14. Environmental Implementation Plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1993-03-15

    The purpose of the Environmental Implementation Plan (EIP) is to show the current and future (five years) environmental plans from individual site organizations and divisions, as well as site environmental programs and initiatives which are designed to protect the environment and meet or exceed changing environmental/regulatory requirements. Communicating with site organizations, departments, and committees is essential in making the site's environmental-planning process work. The EIP gives the site the what, when, how, and why for environmental requirements. Through teamwork and proactive planning, a partnership for environmental excellence is formed to achieve the site vision for SRS to become the recognizedmore » model for Environmental Excellence in the Department of Energy's Nuclear Weapons Complex.« less

  15. Child Care Options: A Workplace Initiative for the 21st Century.

    ERIC Educational Resources Information Center

    Sher, Margery Leveen; Fried, Madeline

    This book examines the business community's responsibility to aid employees and their families with child care. It provides information on why businesses should provide child care and how to plan and manage a work-place child care facility. The 11 chapters cover: (1) program design; (2) architecture; (3) playground design; (4) security; (5)…

  16. Working for Clean Water, 3: Citizen Handbooks. An Information Program for Advisory Groups.

    ERIC Educational Resources Information Center

    Stoltzfus, Lorna Chr., Ed.

    Presented is material from an information program designed to help citizen advisory groups and local officials improve decision-making in water quality planning. The program is designed to help people focus on essential issues and questions by providing materials suitable for people with non-technical backgrounds. Chapter topics include: (1)…

  17. The 10 MWe solar thermal central receiver pilot plant solar facilities design integration, RADL item 1-10

    NASA Astrophysics Data System (ADS)

    1980-07-01

    Accomplishments are reported in the areas of: program management, system integration, the beam characterization system, receiver unit, thermal storage subsystems, master control system, plant support subsystem and engineering services. A solar facilities design integration program action items update is included. Work plan changes and cost underruns are discussed briefly. (LEW)

  18. 75 FR 44920 - National Oil and Hazardous Substances Pollution Contingency Plan; National Priorities List...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-30

    ... is designed primarily for informational purposes and to assist EPA management. Section 300.425(e)(3... building or asphalt pavement. Primary operations at the SMS Instruments facility consisted of overhauling... settlement with EPA in 1988 and the EPA took over all work associated with OU-1 and OU-2 Remedial Design and...

  19. Incorporating waste into an experimental school prototype: lessons regarding materials reclamation opportunities.

    PubMed

    Yeap, Kong Seng; Mohd Yaacob, Naziaty; Rao, Sreenivasaiah Purushothama; Hashim, Nor Rasidah

    2012-12-01

    This article presents lessons learned from a design project that explored the possibility of incorporating waste into the design of a school prototype. The authors worked with professional architects, a waste artist, environmental scientists and local waste operators to uncover new uses and applications for discarded items. As a result, bottles, aluminium cans, reclaimed doors, crushed concrete and second-hand bricks, etc. were identified, explored and integrated into the architectural design. This article serves as a catalyst that advocates the use of reclaimed materials in the field of design and planning. In particular, it highlights the challenges and issues that need to be addressed in carrying out design work with waste. Designers and practitioners interested in minimizing waste generation by proposing the use of reclaimed materials will find this article useful.

  20. ATF Neutron Irradiation Program Technical Plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Geringer, J. W.; Katoh, Yutai

    The Japan Atomic Energy Agency (JAEA) under the Civil Nuclear Energy Working Group (CNWG) is engaged in a cooperative research effort with the U.S. Department of Energy (DOE) to explore issues related to nuclear energy, including research on accident-tolerant fuels and materials for use in light water reactors. This work develops a draft technical plan for a neutron irradiation program on the candidate accident-tolerant fuel cladding materials and elements using the High Flux Isotope Reactor (HFIR). The research program requires the design of a detailed experiment, development of test vehicles, irradiation of test specimens, possible post-irradiation examination and characterization ofmore » irradiated materials and the shipment of irradiated materials to JAEA in Japan. This report discusses the technical plan of the experimental study.« less

  1. Task-level control for autonomous robots

    NASA Technical Reports Server (NTRS)

    Simmons, Reid

    1994-01-01

    Task-level control refers to the integration and coordination of planning, perception, and real-time control to achieve given high-level goals. Autonomous mobile robots need task-level control to effectively achieve complex tasks in uncertain, dynamic environments. This paper describes the Task Control Architecture (TCA), an implemented system that provides commonly needed constructs for task-level control. Facilities provided by TCA include distributed communication, task decomposition and sequencing, resource management, monitoring and exception handling. TCA supports a design methodology in which robot systems are developed incrementally, starting first with deliberative plans that work in nominal situations, and then layering them with reactive behaviors that monitor plan execution and handle exceptions. To further support this approach, design and analysis tools are under development to provide ways of graphically viewing the system and validating its behavior.

  2. Use of Perceive, Recall, Plan, Perform Stage Two Cognitive Task Analysis for Students with Autism and Intellectual Disability: The Impact of a Sensory Activity Schedule

    ERIC Educational Resources Information Center

    Mills, Caroline; Chapparo, Christine

    2017-01-01

    The aim of this study was to determine the impact of a classroom sensory activity schedule (SAS) on cognitive strategy use during task performance. This work studies a single-system AB research design with seven students with autism and intellectual disability. Repeated measures using the Perceive, Recall, Plan and Perform (PRPP) Cognitive Task…

  3. National Ignition Facility: Experimental plan

    NASA Astrophysics Data System (ADS)

    1994-05-01

    As part of the Conceptual Design Report (CDR) for the National Ignition Facility (NIF), scientists from Lawrence Livermore National Laboratory (LLNL), Los Alamos National Laboratory (LANL), Sandia National Laboratory (SNL), the University of Rochester's Laboratory for Laser Energetics (UR/LLE), and EG&G formed an NIF Target Diagnostics Working Group. The purpose of the Target Diagnostics Working Group is to prepare conceptual designs of target diagnostics for inclusion in the facility CDR and to determine how these specifications impact the CDR. To accomplish this, a subgroup has directed its efforts at constructing an approximate experimental plan for the ignition campaign of the NIF CDR. The results of this effort are contained in this document, the Experimental Plan for achieving fusion ignition in the NIF. This group initially concentrated on the flow-down requirements of the experimental campaign leading to ignition, which will dominate the initial efforts of the NIF. It is envisaged, however, that before ignition, there will be parallel campaigns supporting weapons physics, weapons effects, and other research. This plan was developed by analyzing the sequence of activities required to finally fire the laser at the level of power and precision necessary to achieve the conditions of an ignition hohlraum target, and to then use our experience in activating and running Nova experiments to estimate the rate of completing these activities.

  4. Using multi-disciplinary strategic master facilities planning for organizations experiencing programmatic re-direction

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Heubach, J.G.; Weimer, W.C.; Bruce, W.A.

    Facility master planning is critical to the future productivity of a laboratory and the quality of worklife for the laboratory staff. For organizations undergoing programmatic re-direction, a master facility planning approach linked to the organization`s strategic planning process is even more important. Major changes in an organization such as programmatic re-direction can significantly impact a broad range of variables which exceed the expertise of traditional planning teams, e.g., capacity variability, work team organization, organizational culture, and work process simplification. By expanding the diversity of the participants of the planning team, there is a greater likelihood that a research organization`s scientific,more » organizational, economic, and employees` needs can be meshed in the strategic plan and facility plan. Recent recommendations from facility planners suggest drawing from diverse fields in building multi-disciplinary planning teams: Architecture, engineering, natural science, social psychology, and strategic planning (Gibson,1993). For organizations undergoing significant operational or culture change, the master facility planning team should also include members with expertise in organizational effectiveness, industrial engineering, human resources, and environmental psychology. A recent planning and design project provides an example which illustrates the use of an expanded multi-disciplinary team engaged in planning laboratory renovations for a research organization undergoing programmatic re-direction. The purpose of the proposed poster session is to present a multi-disciplinary master facility planning process linked to an organization`s strategic planning process or organizational strategies.« less

  5. Climate-Smart Design for Ecosystem Management: A Test Application for Coral Reefs.

    PubMed

    West, Jordan M; Courtney, Catherine A; Hamilton, Anna T; Parker, Britt A; Julius, Susan H; Hoffman, Jennie; Koltes, Karen H; MacGowan, Petra

    2017-01-01

    The interactive and cumulative impacts of climate change on natural resources such as coral reefs present numerous challenges for conservation planning and management. Climate change adaptation is complex due to climate-stressor interactions across multiple spatial and temporal scales. This leaves decision makers worldwide faced with local, regional, and global-scale threats to ecosystem processes and services, occurring over time frames that require both near-term and long-term planning. Thus there is a need for structured approaches to adaptation planning that integrate existing methods for vulnerability assessment with design and evaluation of effective adaptation responses. The Corals and Climate Adaptation Planning project of the U.S. Coral Reef Task Force seeks to develop guidance for improving coral reef management through tailored application of a climate-smart approach. This approach is based on principles from a recently-published guide which provides a framework for adopting forward-looking goals, based on assessing vulnerabilities to climate change and applying a structured process to design effective adaptation strategies. Work presented in this paper includes: (1) examination of the climate-smart management cycle as it relates to coral reefs; (2) a compilation of adaptation strategies for coral reefs drawn from a comprehensive review of the literature; (3) in-depth demonstration of climate-smart design for place-based crafting of robust adaptation actions; and (4) feedback from stakeholders on the perceived usefulness of the approach. We conclude with a discussion of lessons-learned on integrating climate-smart design into real-world management planning processes and a call from stakeholders for an "adaptation design tool" that is now under development.

  6. Evaluation Plan -- The Minneapolis Ridesharing Commuter Services Demonstration

    DOT National Transportation Integrated Search

    1978-05-01

    In April 1977, the Metropolitan Transit Commission initiated a two-year demonstration project designed to increase work trip-vehicle occupancy at selected employment sites in the Twin Cities region. Key elements of this demonstration which differenti...

  7. Independent Peer Review of the MOVES Design and Emissions Analysis Plans, and Addendum

    EPA Pesticide Factsheets

    Southwest Research Institute (SwRI) prepared this report for a work assignment under the EPA contract “Testing and Analytical Support for Regulation of Motor Vehicles, Engines, Fuels, and Fuel Additives.”

  8. Oregon Department of Transportation research leader : fall 2008.

    DOT National Transportation Integrated Search

    2008-01-01

    The newsletter includes: : 1) To ensure safe travel through construction work zones, Traffic Control Plans (TCPs) are developed to communicate required traffic control measures to the construction team. The quality of the design and implementation of...

  9. Will this open space work?

    PubMed

    Vischer, J

    1999-01-01

    Northern Oil is moving offices, and CEO Fritz Schumacher wants to make the most of the move in this fictional case study. He believes that adopting an open-plan work space will reinvent how the company works, not to mention cut costs. Facilities manager Sasha Pasternak also supports the open plan. Her job would be easier, and her budget would stretch further, if Northern had standardized workstations and used partitions, not walls. And she likes the way the new design flattens the organization: everyone has the same amount of space and the same ergonomically sound furniture. The new building would have more conference rooms and just-in-time work spaces for employees who worked mostly off-site. And although she knew that initial meetings between the architects and Northern employees hadn't yielded much support for open space--people were attached to their private offices--she expected that people would warm to the idea. But when the new design was unveiled, employees were less than enthusiastic. They hurled questions like, How will workers concentrate if they can't shut their office doors? How will people have confidential meetings with their boss? And why would people stay at Northern when the competition offers them private offices? There was even talk of circulating a petition refusing to move to the new space. A week later, the architect presented revised plans to the project group. The new options would add costs and reduce the amount of space savings, but offering a choice to employees might make them feel less threatened. What should the project team do? Five commentators offer advice.

  10. The evolution of an evaluation: a case study using the tribal participatory research model.

    PubMed

    Richmond, Lucinda S; Peterson, Donna J; Betts, Sherry C

    2008-10-01

    This article presents a case study of how the evaluation design for a dating violence prevention and/or youth development program for American Indian youth in Arizona evolved throughout the project. Particular attention is given to how the evaluation design was guided by the tribal participatory research model. A brief rationale for the project is presented along with literature on culturally competent evaluation and research with American Indians. A description of the project and the unique communities in which it was implemented is provided. The focus of the article is the process of how the evaluation plan changed and how various factors influenced this process (e.g., feedback from community stakeholders, conversations with funder, results of process evaluation, suggestions from literature, the authors' experience working in American Indian communities). The authors conclude with lessons learned for others to consider as they develop working relationships and evaluation plans in similar communities.

  11. Re-engineering a pharmacy work system and layout to facilitate patient counseling.

    PubMed

    Lin, A C; Jang, R; Sedani, D; Thomas, S; Barker, K N; Flynn, E A

    1996-07-01

    The development and evaluation of a new work system and facility design for a chain of community pharmacies are described. A new work system was developed to optimize utilization of pharmacist and technician time and allow the pharmacy to increase patient counseling without adding personnel. In the new system, pharmacists would review prescriptions, check technicians' work, and dispense prescriptions, counseling patients as needed; technicians would enter prescriptions into the pharmacy computer and fill them. The existing work system and design were evaluated in June and July of 1992 by observing, classifying, and recording activities of pharmacy personnel three days per week at six pharmacies in the chain. Pharmacy designs that would work with the new work system were created by a university design class after consultation with representatives of the pharmacy chain and the university's college of pharmacy. The pharmacy chain selected one design, and a detailed floor plan and specifications were created. To test how the new design and system would work at each of the six test pharmacies, a computer simulation program was developed and verified by using the data collected on the existing pharmacy operations. Computer simulation showed that, with the new design and system, increasing patient counseling would increase patient waiting time slightly but would not require additional personnel. The layout and work system in a chain of community pharmacies were redesigned to facilitate patient counseling and make the best use of employee time.

  12. Field tests of a participatory ergonomics toolkit for Total Worker Health

    PubMed Central

    Kernan, Laura; Plaku-Alakbarova, Bora; Robertson, Michelle; Warren, Nicholas; Henning, Robert

    2018-01-01

    Growing interest in Total Worker Health® (TWH) programs to advance worker safety, health and well-being motivated development of a toolkit to guide their implementation. Iterative design of a program toolkit occurred in which participatory ergonomics (PE) served as the primary basis to plan integrated TWH interventions in four diverse organizations. The toolkit provided start-up guides for committee formation and training, and a structured PE process for generating integrated TWH interventions. Process data from program facilitators and participants throughout program implementation were used for iterative toolkit design. Program success depended on organizational commitment to regular design team meetings with a trained facilitator, the availability of subject matter experts on ergonomics and health to support the design process, and retraining whenever committee turnover occurred. A two committee structure (employee Design Team, management Steering Committee) provided advantages over a single, multilevel committee structure, and enhanced the planning, communication, and team-work skills of participants. PMID:28166897

  13. Scenario for concurrent conceptual assembly line design: A case study

    NASA Astrophysics Data System (ADS)

    Mas, F.; Ríos, J.; Menéndez, J. L.

    2012-04-01

    The decision to design and build a new aircraft is preceded by years of research and study. Different disciplines work together throughout the lifecycle to ensure not only a complete functional definition of the product, but also a complete industrialization, a marketing plan, a maintenance plan, etc. This case study focuses on the conceptual design phase. During this phase, the design solutions that will meet the functional and industrial requirements are defined, i.e.: the basic requirements of industrialization. During this phase, several alternatives are studied, and the most attractive in terms of performance and cost requirements is selected. As a result of the study of these alternatives, it is possible to define an early conceptual design of the assembly line and its basic parameters. The plant needs, long cycle jigs & tools or industrial means and human resources with the necessary skills can be determined in advance.

  14. CAREER PLANS OF GRADUATES OF A CANADIAN DENTAL SCHOOL: PRELIMINARY REPORT OF A 5-YEAR SURVEY.

    PubMed

    Nassar, Usama; Fairbanks, Connor; Flores-Mir, Carlos; Kilistoff, Alan; Easton, Rick

    2016-07-01

    Comprehensive data on the characteristics and opinions of graduating dental students in Canada are lacking. Specifically, only minimal information is available on graduates' immediate career plans and factors that may influence their decisions regarding these plans. Our aim was to gather such data to allow better understanding of this issue and improve the design of future studies on this topic. The Career Development Committee at the school of dentistry, University of Alberta, designed a short survey to be administered to graduating students over 5 years to gain insight into their immediate career plans and opinions on career services at the school. Preliminary results from 2012-2014 are reported here. With a response rate of close to 90% (n = 99/111), the data reveal considerable differences in immediate career plans between the surveyed students and those in other schools in Canada and the United States. Of the students, 89% were planning to work in a general dental practice and only 9% were planning to enroll in advanced education, including general practice residency training. More research is needed to better understand the factors affecting career path decisions of students.

  15. Building the capacity of health authorities to influence land use and transportation planning: Lessons learned from the Healthy Canada by Design CLASP Project in British Columbia.

    PubMed

    Miro, Alice; Perrotta, Kim; Evans, Heather; Kishchuk, Natalie A; Gram, Claire; Stanwick, Richard S; Swinkels, Helena M

    2014-08-06

    The main objective of the Healthy Canada by Design CLASP Initiative in British Columbia (BC) was to develop, implement and evaluate a capacity-building project for health authorities. The desired outcomes of the project were as follows: 1) increased capacity of the participating health authorities to productively engage in land use and transportation planning processes; 2) new and sustained relationships or collaborations among the participating health authorities and among health authorities, local governments and other built environment stakeholders; and 3) indication of health authority influence and/or application of health evidence and tools in land use and transportation plans and policies. This project was designed to enhance the capacity of three regional health authorities, namely Fraser Health, Island Health and Vancouver Coastal Health, and their staff. These were considered the project's participants. The BC regions served by the three health authorities cover the urban, suburban and rural spectrum across relatively large and diverse geographic areas. The populations have broad ranges in socio-economic status, demographic profiles and cultural and political backgrounds. The Initiative provided the three health authorities with a consultant who had several years of experience working on land use and transportation planning. The consultant conducted situational assessments to understand the baseline knowledge and skill gaps, assets and objectives for built environment work for each of the participating health authorities. On the basis of this information, the consultant developed customized capacity-building work plans for each of the health authorities and assisted them with implementation. Capacity-building activities were as follows: researching health and built environment strategies, policies and evidence; transferring health evidence and promising policies and practices from other jurisdictions to local planning contexts; providing training and support with regard to health and the built environment to health authority staff; bringing together public health staff with local planners for networking; and participating in land use planning processes. The project helped to expand the capacity of participating health authorities to influence land use and transportation planning decisions by increasing the content and process expertise of public health staff. The project informed structural changes within health authorities, such as staffing reallocations to advance built environment work after the project. Health authorities also forged new relationships within and across sectors, which facilitated knowledge exchange and access of the public health sector to opportunities to influence built environment decisions. By the end of the project, there was emerging evidence of a health presence in land use policy documents. The project helped to prioritize, accelerate and formalize the participating health authorities' involvement in land use and transportation planning processes. In the long term, this is expected to lead to health policies and programs that consider the built environment, and to built environment policies and practices that integrate population health goals, thereby reducing the risk of chronic diseases.

  16. Urban Planning by Le Corbusier According to Praxeological Knowledge

    NASA Astrophysics Data System (ADS)

    Dzwierzynska, Jolanta; Prokopska, Aleksandra

    2017-12-01

    The city is formed as a mosaic of various elements which affect its attractiveness. These elements range from location attributes, through economic opportunities, to social aspects. Therefore, urbanity and urban planning should be considered in a multi-dimensional context. In the paper we address the problem of urban planning by Le Corbusier according to praxeological and system knowledge. From praxeological point of view an active human being takes his/her choice between various possibilities by preferring one of these possibilities to the others, and by manifesting it by her actions. The same applies to the design process. Due to this fact, the scientific design process can be treated as a systematic rational reconstruction of the designer’s behaviour. Such a reconstruction requires previous reflection on designer’s work, as well as some consideration and design experience, thus know-how knowledge based on methodological knowledge. In the paper several city visions of Le Corbusier, as well as the characteristics and organisation of his design process are analysed. Le Corbusier’s innovative design ideas resulted from industrialisation changes and motorisation accelerating progress, which gave foundation to a new urban array. This array based on strict geometric forms, regularity and repetition determining standard. Thanks to his theories, Le Corbusier established principles of modern city construction and planning. Although some doubts were expressed as to the scale of centralisation of the cities designed by him and his class-based conception, he was awarded that overall welfare of the individual living in a city was the quality of built environment. Therefore, his designed creations were not only functional but they also produced emotions. The analysis of his prolific design activities allows us to state that the organisation of his architectural and urban planning process was very efficient and complex. The city concepts proposed by him were the subject of analysis by generations of designers. Also now, they can still be the basis for modelling virtual and navigable cities by modern planners. Le Corbusier’s comprehensive approach to modern city planning showed that research activities, that is theoretical thinking, and production activities, that is practice, are linked methodically. Therefore, urban planning should be understood not only as a projection of the possibilities of architecture, but as a multidisciplinary process. Due to this fact, an urban plan, as a result of that process, should be a synthesis of various social, industrial and economic aspects.

  17. Life sciences payload definition and integration study. Volume 2: Requirements, design, and planning studies for the carry-on laboratories. [for Spacelab

    NASA Technical Reports Server (NTRS)

    1974-01-01

    The task phase concerned with the requirements, design, and planning studies for the carry-on laboratory (COL) began with a definition of biomedical research areas and candidate research equipment, and then went on to develop conceptual layouts for COL which were each evaluated in order to arrive at a final conceptual design. Each step in this design/evaluation process concerned itself with man/systems integration research and hardware, and life support and protective systems research and equipment selection. COL integration studies were also conducted and include attention to electrical power and data management requirements, operational considerations, and shuttle/Spacelab interface specifications. A COL program schedule was compiled, and a cost analysis was finalized which takes into account work breakdown, annual funding, and cost reduction guidelines.

  18. KDHE Project Code: C6-074-00002: Progress and Monitoring Report for the LDB/SVE/AS System at the Former CCC/USDA Grain Storage Facility, Agra, Kansas, in January-June 2015

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    LaFreniere, Lorraine M.

    In 2008-2009, to address the carbon tetrachloride contamination detected on its former property, the CCC/USDA implemented a source area cleanup in accord with the document Interim Measure Work Plan/Design for Agra, Kansas (IMWP/D; Argonne 2008). The cleanup involves five large-diameter boreholes (LDBs) coupled with soil vapor extraction (SVE) and air sparge (AS) systems. The work plan was approved by the Kansas Department of Health and Environment (KDHE) in November 2008 (KDHE 2008b), and operation began in May 2009.

  19. KDHE Project Code: C6-074-00002: Progress and Monitoring Report for the LDB/SVE/AS System at the Former CCC/USDA Grain Storage Facility, Agra, Kansas, in January-June 2013

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    LaFreniere, Lorraine

    In 2008-2009, to address the carbon tetrachloride contamination detected on its former property, the CCC/USDA implemented a source area cleanup in accord with the document Interim Measure Work Plan/Design for Agra, Kansas (IMWP/D; Argonne 2008). The cleanup involves five large-diameter boreholes (LDBs) coupled with soil vapor extraction (SVE) and air sparging (AS). The work plan was approved by the Kansas Department of Health and Environment (KDHE) in November 2008 (KDHE 2008b), and operation began in May 2009.

  20. KDHE POroject Code: C6-074-00002: Progress and Monitoring Report for the LBD/SVE/AS System at the Former CCC/USDA Grain Storage Facility, Agra, Kansas, in January-June 2016

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    LaFreniere, Lorraine M.

    In 2008-2009, to address the carbon tetrachloride contamination detected on its former property, the CCC/USDA implemented a source area cleanup in accord with the document Interim Measure Work Plan/Design for Agra, Kansas (IMWP/D; Argonne 2008). The cleanup involves five large-diameter boreholes (LDBs) coupled with soil vapor extraction (SVE) and air sparge (AS) systems. The work plan was approved by the Kansas Department of Health and Environment (KDHE) in November 2008 (KDHE 2008b), and operation began in May 2009.

  1. Consultants in nhs scotland: a survey of work commitments, remuneration, job satisfaction and retirement plans.

    PubMed

    French, F H; Andrew, J E; Awramenko, M; Coutts, H; Leighton-Beck, L; Mollison, J; Needham, G; Scott, A; Walker, K A

    2004-05-01

    UK consultants have reported working long hours, increased stress and reduced morale. This study set out to elicit consultants' views on flexible working and to gather data on consultants' workloads, remuneration, job satisfaction and retirement plans. As such it is the first comprehensive study of consultants in NHS Scotland. The Information and Statistics Division of the Scottish Executive Health Dept provided a list of consultants working in NHS Scotland Focus groups and interviews informed the design of a postal self-completion, questionnaire. The response ratewas 61%. Almost two-thirds (65%) of respondents felt their workloads were unreasonable and unsustainable and 67% were unable to provide their desired standards of patient care. Two-thirds (67%) did not normally take meal breaks, 63% had insufficient time for outside interests, whilst 44% felt their health was being adversely affected Many (84%) believed that some of their work could be delegated to someone less qualified but 79% agreed that there were insufficient staff to make this possible. The average planned retirement age was 60 years, with 23% describing their plans as definite and 70% as quite or very likely. When asked what might induce them to postpone retirement, 50% cited reduced workload/work intensity. In 2003, a majority of consultants in the UK voted in favour of the new consultant contract. This will improve consultant pay and introduce a standard 40-hour working week, including worked on-call. This should address tow of the main areas of consultant dissatisfaction in NHS Scotland. However, staff shortages will require to be addressed if the contract is to be successfully implemented.

  2. Impact of Job Design Problems and Lack of Support. Draft Version. Working Paper #6.

    ERIC Educational Resources Information Center

    Gersten, Russell; And Others

    This paper presents implications of the path analysis procedures used to interpret data from a study of urban special education teachers' perceptions of working conditions. The analysis looked at a broad range of factors that could affect teacher plans to leave the field. An overall finding emerging from the analysis was that the same fundamental…

  3. Satellite Power Systems (SPS) concept definition study (exhibit C)

    NASA Technical Reports Server (NTRS)

    Hanley, G. M.

    1978-01-01

    A coplanar satellite conceptual approach was defined. This effort included several trade studies related to satellite design and also construction approaches for this satellite. A transportation system, consistent with this concept, was also studied, including an electric orbit transfer vehicle and a parallel-burn heavy lift launch vehicle. Work on a solid state microwave concept continued and several alternative approaches were evaluated. Computer determination of an optimized transistor and circuit design was also continued. Experiment/verification planning resulted in the development of a total solar array and microwave technology development plan, as well as definition of near-term research to evaluate key technology issues.

  4. Lunar exploration rover program developments

    NASA Technical Reports Server (NTRS)

    Klarer, P. R.

    1994-01-01

    The Robotic All Terrain Lunar Exploration Rover (RATLER) design concept began at Sandia National Laboratories in late 1991 with a series of small, proof-of-principle, working scale models. The models proved the viability of the concept for high mobility through mechanical simplicity, and eventually received internal funding at Sandia National Laboratories for full scale, proof-of-concept prototype development. Whereas the proof-of-principle models demonstrated the mechanical design's capabilities for mobility, the full scale proof-of-concept design currently under development is intended to support field operations for experiments in telerobotics, autonomous robotic operations, telerobotic field geology, and advanced man-machine interface concepts. The development program's current status is described, including an outline of the program's work over the past year, recent accomplishments, and plans for follow-on development work.

  5. CFD Research, Parallel Computation and Aerodynamic Optimization

    NASA Technical Reports Server (NTRS)

    Ryan, James S.

    1995-01-01

    During the last five years, CFD has matured substantially. Pure CFD research remains to be done, but much of the focus has shifted to integration of CFD into the design process. The work under these cooperative agreements reflects this trend. The recent work, and work which is planned, is designed to enhance the competitiveness of the US aerospace industry. CFD and optimization approaches are being developed and tested, so that the industry can better choose which methods to adopt in their design processes. The range of computer architectures has been dramatically broadened, as the assumption that only huge vector supercomputers could be useful has faded. Today, researchers and industry can trade off time, cost, and availability, choosing vector supercomputers, scalable parallel architectures, networked workstations, or heterogenous combinations of these to complete required computations efficiently.

  6. An expert-based approach to forest road network planning by combining Delphi and spatial multi-criteria evaluation.

    PubMed

    Hayati, Elyas; Majnounian, Baris; Abdi, Ehsan; Sessions, John; Makhdoum, Majid

    2013-02-01

    Changes in forest landscapes resulting from road construction have increased remarkably in the last few years. On the other hand, the sustainable management of forest resources can only be achieved through a well-organized road network. In order to minimize the environmental impacts of forest roads, forest road managers must design the road network efficiently and environmentally as well. Efficient planning methodologies can assist forest road managers in considering the technical, economic, and environmental factors that affect forest road planning. This paper describes a three-stage methodology using the Delphi method for selecting the important criteria, the Analytic Hierarchy Process for obtaining the relative importance of the criteria, and finally, a spatial multi-criteria evaluation in a geographic information system (GIS) environment for identifying the lowest-impact road network alternative. Results of the Delphi method revealed that ground slope, lithology, distance from stream network, distance from faults, landslide susceptibility, erosion susceptibility, geology, and soil texture are the most important criteria for forest road planning in the study area. The suitability map for road planning was then obtained by combining the fuzzy map layers of these criteria with respect to their weights. Nine road network alternatives were designed using PEGGER, an ArcView GIS extension, and finally, their values were extracted from the suitability map. Results showed that the methodology was useful for identifying road that met environmental and cost considerations. Based on this work, we suggest future work in forest road planning using multi-criteria evaluation and decision making be considered in other regions and that the road planning criteria identified in this study may be useful.

  7. Wood Block and Toy Project. Designed for Diversely-Abled Senior Volunteers.

    ERIC Educational Resources Information Center

    Dugan, Willis E.

    This document describes a volunteer work project designed for nursing home and day-care center persons with minimal physical skills. Potential users of the project are cautioned to plan carefully for the host location where the project will be conducted, as the location must be easily accessible to older adults who may be handicapped and who may…

  8. NAEP Reconfigured: An Integrated Redesign of the National Assessment of Educational Progress. Working Paper Series.

    ERIC Educational Resources Information Center

    Johnson, Eugene G.; Lazer, Stephen; O'Sullivan, Christine Y.

    Chapters in this report outline the potential plans for the redesign of the National Assessment of Educational Progress (NAEP). It is argued that any successful redesign must consider the NAEP as a whole. This report reviews overall NAEP designs and discusses the implications that each of the designs has for various functional areas. The following…

  9. Methods for Aquifer Thermal Energy Storage planning; The hidden side of cities.

    NASA Astrophysics Data System (ADS)

    Jaxa-Rozen, M.; Bloemendal, M.; Theo, O.

    2017-12-01

    Aquifer Thermal Energy Storage (ATES) systems reduce energy use and greenhouse gas emissions in urban areas, by supplying heating and cooling to buildings with a heat pump combined with seasonal heat storage in aquifers. The climactic and geohydrological conditions required for this technology can be found in many temperate regions around the world; In The Netherlands there are currently approximately 2,200 active systems. Despite this modest adoption level, many urban areas in the Netherlands already struggle to accommodate the subsurface claims needed to further develop ATES under current planning regulations. To identify best practices for ATES planning and maximize the technology's future potential, this work first reviews a set of 24 ATES-plans which were used for the spatial layout of ATES in various urban areas in The Netherlands and the method used to make those plans. This analysis revealed that three crucial elements are found to be missing in current ATES planning: i) a consistent assessment framework which can be used to compare the performance of different planning strategies; ii) a systematic adjustment of ATES design parameters to suit local conditions; iii) the identification and use of aquifer allocation thresholds to guide the choice of a planning strategy. All three steps are elaborated and added to the method. For the latter, these thresholds are identified by exploratory numerical modelling, using a coupled agent-based/geohydrological (MODFLOW) simulation to explore a broad range of scenarios for ATES design and layout parameters. The results give insight in how technical ATES-well design choices affect optimal use of subsurface space and in the trade-of between individual efficiency and overall emission reductions. The improved ATES-planning method now fosters planning and design rules ensuring optimal and sustainable use of subsurface space, i.e. maximizing energy saving by accommodating as much ATES systems as possible while maintaining individual well efficiency.

  10. Sample Federal Facility Land Use Control ROD Checklist and Suggested Language (LUC Checklist)

    EPA Pesticide Factsheets

    The LUC Checklist provides direction on describing and documenting land use controls (LUCs) in federal facility actrions under CERCLA in Records of Decision (RODs), remedial designs (RDs), and remedial action work plans (RAWPs).

  11. Assessing the nutrient intake of a low-carbohydrate, high-fat (LCHF) diet: a hypothetical case study design

    PubMed Central

    Zinn, Caryn; Rush, Amy; Johnson, Rebecca

    2018-01-01

    Objective The low-carbohydrate, high-fat (LCHF) diet is becoming increasingly employed in clinical dietetic practice as a means to manage many health-related conditions. Yet, it continues to remain contentious in nutrition circles due to a belief that the diet is devoid of nutrients and concern around its saturated fat content. This work aimed to assess the micronutrient intake of the LCHF diet under two conditions of saturated fat thresholds. Design In this descriptive study, two LCHF meal plans were designed for two hypothetical cases representing the average Australian male and female weight-stable adult. National documented heights, a body mass index of 22.5 to establish weight and a 1.6 activity factor were used to estimate total energy intake using the Schofield equation. Carbohydrate was limited to <130 g, protein was set at 15%–25% of total energy and fat supplied the remaining calories. One version of the diet aligned with the national saturated fat guideline threshold of <10% of total energy and the other included saturated fat ad libitum. Primary outcomes The primary outcomes included all micronutrients, which were assessed using FoodWorks dietary analysis software against national Australian/New Zealand nutrient reference value (NRV) thresholds. Results All of the meal plans exceeded the minimum NRV thresholds, apart from iron in the female meal plans, which achieved 86%–98% of the threshold. Saturated fat intake was logistically unable to be reduced below the 10% threshold for the male plan but exceeded the threshold by 2 g (0.6%). Conclusion Despite macronutrient proportions not aligning with current national dietary guidelines, a well-planned LCHF meal plan can be considered micronutrient replete. This is an important finding for health professionals, consumers and critics of LCHF nutrition, as it dispels the myth that these diets are suboptimal in their micronutrient supply. As with any diet, for optimal nutrient achievement, meals need to be well formulated. PMID:29439004

  12. Challenges of developing an electro-optical system for measuring man's operational envelope

    NASA Technical Reports Server (NTRS)

    Woolford, B.

    1985-01-01

    In designing work stations and restraint systems, and in planning tasks to be performed in space, a knowledge of the capabilities of the operator is essential. Answers to such questions as whether a specific control or work surface can be reached from a given restraint and how much force can be applied are of particular interest. A computer-aided design system has been developed for designing and evaluating work stations, etc., and the Anthropometric Measurement Laboratory (AML) has been charged with obtaining the data to be used in design and modeling. Traditional methods of measuring reach and force are very labor intensive and require bulky equipment. The AML has developed a series of electro-optical devices for collecting reach data easily, in computer readable form, with portable systems. The systems developed, their use, and data collected with them are described.

  13. Towards Assessing the Human Trajectory Planning Horizon

    PubMed Central

    Nitsch, Verena; Meinzer, Dominik; Wollherr, Dirk

    2016-01-01

    Mobile robots are envisioned to cooperate closely with humans and to integrate seamlessly into a shared environment. For locomotion, these environments resemble traversable areas which are shared between multiple agents like humans and robots. The seamless integration of mobile robots into these environments requires accurate predictions of human locomotion. This work considers optimal control and model predictive control approaches for accurate trajectory prediction and proposes to integrate aspects of human behavior to improve their performance. Recently developed models are not able to reproduce accurately trajectories that result from sudden avoidance maneuvers. Particularly, the human locomotion behavior when handling disturbances from other agents poses a problem. The goal of this work is to investigate whether humans alter their trajectory planning horizon, in order to resolve abruptly emerging collision situations. By modeling humans as model predictive controllers, the influence of the planning horizon is investigated in simulations. Based on these results, an experiment is designed to identify, whether humans initiate a change in their locomotion planning behavior while moving in a complex environment. The results support the hypothesis, that humans employ a shorter planning horizon to avoid collisions that are triggered by unexpected disturbances. Observations presented in this work are expected to further improve the generalizability and accuracy of prediction methods based on dynamic models. PMID:27936015

  14. Towards Assessing the Human Trajectory Planning Horizon.

    PubMed

    Carton, Daniel; Nitsch, Verena; Meinzer, Dominik; Wollherr, Dirk

    2016-01-01

    Mobile robots are envisioned to cooperate closely with humans and to integrate seamlessly into a shared environment. For locomotion, these environments resemble traversable areas which are shared between multiple agents like humans and robots. The seamless integration of mobile robots into these environments requires accurate predictions of human locomotion. This work considers optimal control and model predictive control approaches for accurate trajectory prediction and proposes to integrate aspects of human behavior to improve their performance. Recently developed models are not able to reproduce accurately trajectories that result from sudden avoidance maneuvers. Particularly, the human locomotion behavior when handling disturbances from other agents poses a problem. The goal of this work is to investigate whether humans alter their trajectory planning horizon, in order to resolve abruptly emerging collision situations. By modeling humans as model predictive controllers, the influence of the planning horizon is investigated in simulations. Based on these results, an experiment is designed to identify, whether humans initiate a change in their locomotion planning behavior while moving in a complex environment. The results support the hypothesis, that humans employ a shorter planning horizon to avoid collisions that are triggered by unexpected disturbances. Observations presented in this work are expected to further improve the generalizability and accuracy of prediction methods based on dynamic models.

  15. Status of the Consolidation of the LHC Superconducting Magnets and Circuits

    NASA Astrophysics Data System (ADS)

    Tock, J. Ph; Atieh, S.; Bodart, D.; Bordry, F.; Bourcey, N.; Cruikshank, P.; Dahlerup-Petersen, K.; Dalin, J. M.; Garion, C.; Musso, A.; Ostojic, R.; Perin, A.; Pojer, M.; Savary, F.; Scheuerlein, C.

    2014-05-01

    The first LHC long shutdown (LS1) started in February 2013. It was triggered by the need to consolidate the 13 kA splices between the superconducting magnets to allow the LHC to reach safely its design energy of 14 TeV center of mass. The final design of the consolidated splices is recalled. 1695 interconnections containing 10 170 splices have to be opened. In addition to the work on the 13 kA splices, the other interventions performed during the first long shut-down on all the superconducting circuits are described. All this work has been structured in a project, gathering about 280 persons. The opening of the interconnections started in April 2013 and consolidation works are planned to be completed by August 2014. This paper describes first the preparation phase with the building of the teams and the detailed planning of the operation. Then, it gives feedback from the worksite, namely lessons learnt and adaptations that were implemented, both from the technical and organizational points of view. Finally, perspectives for the completion of this consolidation campaign are given.

  16. Online Learning Flight Control for Intelligent Flight Control Systems (IFCS)

    NASA Technical Reports Server (NTRS)

    Niewoehner, Kevin R.; Carter, John (Technical Monitor)

    2001-01-01

    The research accomplishments for the cooperative agreement 'Online Learning Flight Control for Intelligent Flight Control Systems (IFCS)' include the following: (1) previous IFC program data collection and analysis; (2) IFC program support site (configured IFC systems support network, configured Tornado/VxWorks OS development system, made Configuration and Documentation Management Systems Internet accessible); (3) Airborne Research Test Systems (ARTS) II Hardware (developed hardware requirements specification, developing environmental testing requirements, hardware design, and hardware design development); (4) ARTS II software development laboratory unit (procurement of lab style hardware, configured lab style hardware, and designed interface module equivalent to ARTS II faceplate); (5) program support documentation (developed software development plan, configuration management plan, and software verification and validation plan); (6) LWR algorithm analysis (performed timing and profiling on algorithm); (7) pre-trained neural network analysis; (8) Dynamic Cell Structures (DCS) Neural Network Analysis (performing timing and profiling on algorithm); and (9) conducted technical interchange and quarterly meetings to define IFC research goals.

  17. Implementation Plan for Qualification of Sodium-Cooled Fast Reactor Technology Information

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Moe, Wayne; Honma, George

    This document identifies and discusses implementation elements that can be used to facilitate consistent and systematic evaluation processes relating to quality attributes of technical information (with focus on SFR technology) that will be used to support licensing of advanced reactor designs. Information may include, but is not limited to, design documents for SFRs, research-and-development (R&D) data and associated documents, test plans and associated protocols, operations and test data, international research data, technical reports, and information associated with past U.S. Nuclear Regulatory Commission (NRC) reviews of SFR designs. The approach for determining acceptability of test data, analysis, and/or other technical informationmore » is based on guidance provided in INL/EXT-15-35805, “Guidance on Evaluating Historic Technology Information for Use in Advanced Reactor Licensing.” The implementation plan can be adopted into a working procedure at each of the national laboratories performing data qualification, or by applicants seeking future license application for advanced reactor technology.« less

  18. Designs and Plans for MAIZE: a 1 MA LTD-Driven Z-Pinch

    NASA Astrophysics Data System (ADS)

    Gilgenbach, R. M.; Gomez, M. R.; Zier, J.; Tang, W.; French, D. M.; Hoff, B. W.; Jordan, N.; Cruz, E.; Lau, Y. Y.; Fowler-Guzzardo, T.; Meisel, J.; Mazarakis, M. G.; Cuneo, M. E.; Johnston, M. D.; Mehlhorn, T. A.; Kim, A. A.; Sinebryukhov, V. A.

    2007-11-01

    We present designs and experimental plans of the first 1 MA z-pinch in the USA to be driven by a Linear Transformer Driver (LTD). The Michigan Accelerator for Inductive Z-pinch Experiments, (MAIZE), is based on the LTD developed at the Institute for High Current Electronics, utilizing 80 capacitors and 40 spark gap switches to deliver a 1 MA, 100 kV pulse with <100 ns risetime. Designs will be presented of a low-inductance MITL terminated in a wire-array z-pinch. Initial, planned experiments will evaluate the LTD driving time-changing inductance of imploding 4-16 wire-array z-pinches. Wire ablation dynamics, axial-correlations and instability development will be explored. *This work was supported by U. S. DoE through Sandia National Laboratories award number 240985 to the University of Michigan. Sandia is a multiprogram laboratory operated by Sandia Corporation, a Lockheed Martin Company, for the United States Department of Energy's National Nuclear Security Administration under Contract DE-AC04-94AL85000.

  19. The path to active living: physical activity through community design in Somerville, Massachusetts.

    PubMed

    Burke, Noreen M; Chomitz, Virginia R; Rioles, Nicole A; Winslow, Stephen P; Brukilacchio, Lisa B; Baker, Jessie C

    2009-12-01

    Somerville, Massachusetts, an ethnically diverse, urban community northwest of Boston, presents opportunities and challenges for active living. With a dense street grid, well-maintained sidewalks, neighborhood parks, and existing Community Path, Somerville is very walkable. However, two major surface arteries traverse and bisect neighborhoods, creating pedestrian safety and environmental justice issues. Major goals included promoting increased collaboration and communication among existing active-living efforts; managing the Community Path extension project; encouraging Portuguese-speaking adults to incorporate daily physical activity; leveraging existing urban planning work to establish secure, attractive walking/biking corridors; and embedding active-living messages in everyday life. The Somerville Active Living by Design Partnership (ALbD) successfully created a robust task force that was integrated with citywide active-living efforts, secured resources to increase infrastructure and support for active living, including city-level coordinator positions, and changed decision-making practices that led to incorporation of pedestrian and bicycle transportation priorities into city planning and that influenced the extension of the Community Path. Partnerships must employ sustainability planning early on, utilize skilled facilitative leaders to manage leadership transitions, and engage new partners. Identifying, cultivating, and celebrating champions, especially those with political power, are critical. Working closely with research partners leads to rich data sources for planning and evaluation. Changing the built environment is difficult; working toward smaller wins is realistic and achievable. The synergy of ALbD and other community interventions created a foundation for short-term successes and accelerated political-cultural changes already underway with respect to active living.

  20. Evaluation of HACCP Plans of Food Industries: Case Study Conducted by the Servizio di Igiene degli Alimenti e della Nutrizione (Food and Nutrition Health Service) of the Local Health Authority of Foggia, Italy

    PubMed Central

    Panunzio, Michele F.; Antoniciello, Antonietta; Pisano, Alessandra; Rosa, Giovanna

    2007-01-01

    With respect to food safety, many works have studied the effectiveness of self-monitoring plans of food companies, designed using the Hazard Analysis and Critical Control Point (HACCP) method. On the other hand, in-depth research has not been made concerning the adherence of the plans to HACCP standards. During our research, we evaluated 116 self-monitoring plans adopted by food companies located in the territory of the Local Health Authority (LHA) of Foggia, Italy. The general errors (terminology, philosophy and redundancy) and the specific errors (transversal plan, critical limits, hazard specificity, and lack of procedures) were standardized. Concerning the general errors, terminological errors pertain to half the plans examined, 47% include superfluous elements and 60% have repetitive subjects. With regards to the specific errors, 77% of the plans examined contained specific errors. The evaluation has pointed out the lack of comprehension of the HACCP system by the food companies and has allowed the Servizio di Igiene degli Alimenti e della Nutrizione (Food and Nutrition Health Service), in its capacity as a control body, to intervene with the companies in order to improve designing HACCP plans. PMID:17911662

  1. Application of Mathematical and Three-Dimensional Computer Modeling Tools in the Planning of Processes of Fuel and Energy Complexes

    NASA Astrophysics Data System (ADS)

    Aksenova, Olesya; Nikolaeva, Evgenia; Cehlár, Michal

    2017-11-01

    This work aims to investigate the effectiveness of mathematical and three-dimensional computer modeling tools in the planning of processes of fuel and energy complexes at the planning and design phase of a thermal power plant (TPP). A solution for purification of gas emissions at the design development phase of waste treatment systems is proposed employing mathematical and three-dimensional computer modeling - using the E-nets apparatus and the development of a 3D model of the future gas emission purification system. Which allows to visualize the designed result, to select and scientifically prove economically feasible technology, as well as to ensure the high environmental and social effect of the developed waste treatment system. The authors present results of a treatment of planned technological processes and the system for purifying gas emissions in terms of E-nets. using mathematical modeling in the Simulink application. What allowed to create a model of a device from the library of standard blocks and to perform calculations. A three-dimensional model of a system for purifying gas emissions has been constructed. It allows to visualize technological processes and compare them with the theoretical calculations at the design phase of a TPP and. if necessary, make adjustments.

  2. Shared decision making in designing new healthcare environments-time to begin improving quality.

    PubMed

    Elf, Marie; Fröst, Peter; Lindahl, Göran; Wijk, Helle

    2015-03-21

    Successful implementation of new methods and models of healthcare to achieve better patient outcomes and safe, person-centered care is dependent on the physical environment of the healthcare architecture in which the healthcare is provided. Thus, decisions concerning healthcare architecture are critical because it affects people and work processes for many years and requires a long-term financial commitment from society. In this paper, we describe and suggest several strategies (critical factors) to promote shared-decision making when planning and designing new healthcare environments. This paper discusses challenges and hindrances observed in the literature and from the authors extensive experiences in the field of planning and designing healthcare environments. An overview is presented of the challenges and new approaches for a process that involves the mutual exchange of knowledge among various stakeholders. Additionally, design approaches that balance the influence of specific and local requirements with general knowledge and evidence that should be encouraged are discussed. We suggest a shared-decision making and collaborative planning and design process between representatives from healthcare, construction sector and architecture based on evidence and end-users' perspectives. If carefully and systematically applied, this approach will support and develop a framework for creating high quality healthcare environments.

  3. A qualitative investigation of Foundation Year 2 doctors' views on the European Working Time Directive.

    PubMed

    Duncan, Myanna; Haslam, Cheryl

    2015-01-01

    PURPOSE - The purpose of this paper is to examine the personal views and experiences of Foundation Year 2 doctors operating under the European Working Time Directive (EWTD). DESIGN/METHODOLOGY/APPROACH - In total, 36 Foundation Year 2 doctors from a single UK-based Deanery participated in this semistructured interview study. FINDINGS - Findings indicated that Foundation doctors typically welcomed a regulation of working hours, but reported frustration at the manner in which the Directive had been implemented. Participants reported concerns at reducing hours by removing out-of-hours working in order to meet EWTD requirements. Out-of-hours shifts were highly valued owing to their increased opportunities for autonomous clinical decision making. By contrast, day-shifts were regarded as heavily administrative in nature and were perceived as service provision. Foundation doctors discussed the unique nature of the out-of-hours working period which appeared to provide specific learning opportunities as doctors draw on time management and prioritisation skills. ORIGINALITY/VALUE - Given the challenges the EWTD presents, careful rota planning is essential. First, the authors would encourage the restructuring of day-shift work to provide a greater emphasis on hands-on skills experience in a supportive, supervised environment. Second, where possible, Foundation doctors might benefit from the opportunity to engage in some out-of-hours working, such as with multi-professional "Hospital at Night" teams. Third, the authors would encourage junior doctor involvement in rota design and planning which may increase their perceived autonomy and therefore buy-in of working practices.

  4. 75 FR 4849 - Notice of Entering Into a Compact With the Republic of Moldova

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-29

    ... assessment, detailed design work, and a resettlement action plan for the road segment continuing on to the... undergo sterilizations or to pay for any biomedical research which relates, in whole or in part, to...

  5. Work plan for special design features and crack sealing maintenance.

    DOT National Transportation Integrated Search

    2013-09-01

    The Alaska DOT&PF wants to construct and maintain asphalt concrete (AC) paved highways in a way that minimizes roadway lifecycle costs while preserving acceptable : performance. Thermal cracking is a natural feature of most paved Alaska roadways that...

  6. Development of SWITCH-Hawaii model: loads and renewable resources.

    DOT National Transportation Integrated Search

    2016-08-01

    This report summarizes work done to configure the SWITCH power system model using data for the Oahu power system. SWITCH is a planning model designed to choose optimal infrastructure investments for power systems over a multi-decade period. Investmen...

  7. Development of an interactive GIS based work zone traffic control tool.

    DOT National Transportation Integrated Search

    2013-08-01

    The purpose of this study was to include consideration for intersections into the previously created GIS traffic control planning tool. Available data for making intersection control calculations were collected and integrated into the design of the t...

  8. Los Angeles congestion reduction demonstration (Metro ExpressLanes) program. National evaluation : safety data test plan.

    DOT National Transportation Integrated Search

    1999-07-01

    This document presents human factors guidelines for designers, owners operators, and planners involved in the development and operation of traffic management centers. Dimensions of the work environment affecting operator and system performance are ad...

  9. Proof of concept : examining characteristics of roadway infrastructure in various 3D visualization modes.

    DOT National Transportation Integrated Search

    2015-02-01

    Utilizing enhanced visualization in transportation planning and design gained popularity in the last decade. This work aimed at : demonstrating the concept of utilizing a highly immersive, virtual reality simulation engine for creating dynamic, inter...

  10. The Denver region traffic signal system improvement program : planning for management and operations

    DOT National Transportation Integrated Search

    2009-04-01

    The Denver Regional Council of Governments (DRCOG) works with over 30 local jurisdictions on the Traffic Signal System Improvement Program (TSSIP), a combination of management and operations strategies designed to time and coordinate traffic signals ...

  11. Laboratory Equipment Criteria.

    ERIC Educational Resources Information Center

    State Univ. Construction Fund, Albany, NY.

    Requirements for planning, designing, constructing and installing laboratory furniture are given in conjunction with establishing facility criteria for housing laboratory equipment. Furniture and equipment described include--(1) center tables, (2) reagent racks, (3) laboratory benches and their mechanical fixtures, (4) sink and work counters, (5)…

  12. Enforcement Requirements For High-Occupancy Vehicle Facilities, Final Report

    DOT National Transportation Integrated Search

    1995-02-01

    This handbook is designed for technical staff as an instructional guide to the 1990 Census Transportation Planning Package (CTPP) and its potential uses. the CTPP contains 1990 social and economic data by place of residence, place of work, and journe...

  13. Career Profiles.

    ERIC Educational Resources Information Center

    Dallas Independent School District, TX. Dept. of Research, Evaluation, and Information Systems.

    A guide to skilled occupations presents information on 30 occupations in narrative form. It is designed for students to use in career planning. For each occupation, the narrator describes, in conversational, first person form, the job, working conditions, necessary qualifications and personal characteristics, related school subjects, and…

  14. Planning and executing complex large-scale exercises.

    PubMed

    McCormick, Lisa C; Hites, Lisle; Wakelee, Jessica F; Rucks, Andrew C; Ginter, Peter M

    2014-01-01

    Increasingly, public health departments are designing and engaging in complex operations-based full-scale exercises to test multiple public health preparedness response functions. The Department of Homeland Security's Homeland Security Exercise and Evaluation Program (HSEEP) supplies benchmark guidelines that provide a framework for both the design and the evaluation of drills and exercises; however, the HSEEP framework does not seem to have been designed to manage the development and evaluation of multiple, operations-based, parallel exercises combined into 1 complex large-scale event. Lessons learned from the planning of the Mississippi State Department of Health Emergency Support Function--8 involvement in National Level Exercise 2011 were used to develop an expanded exercise planning model that is HSEEP compliant but accounts for increased exercise complexity and is more functional for public health. The Expanded HSEEP (E-HSEEP) model was developed through changes in the HSEEP exercise planning process in areas of Exercise Plan, Controller/Evaluator Handbook, Evaluation Plan, and After Action Report and Improvement Plan development. The E-HSEEP model was tested and refined during the planning and evaluation of Mississippi's State-level Emergency Support Function-8 exercises in 2012 and 2013. As a result of using the E-HSEEP model, Mississippi State Department of Health was able to capture strengths, lessons learned, and areas for improvement, and identify microlevel issues that may have been missed using the traditional HSEEP framework. The South Central Preparedness and Emergency Response Learning Center is working to create an Excel-based E-HSEEP tool that will allow practice partners to build a database to track corrective actions and conduct many different types of analyses and comparisons.

  15. Principles of Design for High Performing Organizations: An Assessment of the State of the Field of Organizational Design Research

    DTIC Science & Technology

    1994-03-01

    asked whether the planned structure considered (a) all objectives, (b) all functions, (c) all relevant units of analysis such as the plant , the...literature and provides an integrative model of design for high perfor-ming organizations. The model is based on an analysis of current theories of...important midrange theories underlie much of the work on organizational analysis . 0 Systems Approaches. These approaches emphasize the rational, goal

  16. Microscope basics.

    PubMed

    Sluder, Greenfield; Nordberg, Joshua J

    2013-01-01

    This chapter provides information on how microscopes work and discusses some of the microscope issues to be considered in using a video camera on the microscope. There are two types of microscopes in use today for research in cell biology-the older finite tube-length (typically 160mm mechanical tube length) microscopes and the infinity optics microscopes that are now produced. The objective lens forms a magnified, real image of the specimen at a specific distance from the objective known as the intermediate image plane. All objectives are designed to be used with the specimen at a defined distance from the front lens element of the objective (the working distance) so that the image formed is located at a specific location in the microscope. Infinity optics microscopes differ from the finite tube-length microscopes in that the objectives are designed to project the image of the specimen to infinity and do not, on their own, form a real image of the specimen. Three types of objectives are in common use today-plan achromats, plan apochromats, and plan fluorite lenses. The concept of mounting video cameras on the microscope is also presented in the chapter. Copyright © 2003 Elsevier Inc. All rights reserved.

  17. A fit for purpose training programme for the decontamination of personnel.

    PubMed

    O'Mara, E; Cole, P; Wynn, A; Collison, R

    2015-06-01

    Contingency plans are a crucial part of operating any nuclear facility. The success of a contingency plan depends on the efficacy of the plan and the confidence and understanding of those who must enact it. This project focused on both of these aspects, clarifying technique and then designing and delivering a training programme for decontamination. The design of the training was based on the IAEA Systematic Approach to Training (SAT). The delivery focused on ways of increasing retention including use of practical examples and assessment, peer assessment and visual contingency plans. A quantitative survey of the trainees was conducted using a questionnaire before and after the training programme delivery. The results clearly demonstrate an improvement across all elements of skills and knowledge required to undertake decontamination. Effective training is fundamental to the development of a good safety culture and the methodology used in this work has led to a clear improvement in radiation protection culture at the Devonport site.

  18. Highligts of the contract year, 1 February 1974 to 31 January 1975

    NASA Technical Reports Server (NTRS)

    1975-01-01

    Two major marketing programs were initiated during 1974: (1) the unlimited search plan, and (2) the sales representative plan for northern California. The unlimited search plan was a six month program designed to offer clients multiple searches for a fixed fee. Although initial response was quite favorable, interest waned, and the plan was not renewed. Expansion and improvement of the on-line retrieval service continued. The ERIC thesaurus was added to the system. This thesaurus is an important acquisition as it gives the user greater flexibility in determining the best strategy for his search. Total terminal output time was reduced with a change to the direct access work file.

  19. Planning Hospital Library Quarters: References to Help the Librarian

    PubMed Central

    Hayne, Frances

    1965-01-01

    When a hospital planned an addition that would allow library expansion, the librarian looked into relevant literature for information on what improvements she should request for the new library. Shortly she was reading not for self-instruction alone but also to strengthen her credentials for membership on the planning team. The bibliography which resulted has been annotated and, by means of an index, classified. Topics examined in the twenty-five references range from library standards and the writing of a significant building program to attainment of happy collaboration between librarian and architect, space relationships designed to facilitate work flow, planned flexibility for the sake of the future, and heating, lighting, decoration, library equipment, and furniture. PMID:14306022

  20. Study to define an approach for developing a computer-based system capable of automatic, unattended assembly/disassembly of spacecraft, phase 1

    NASA Technical Reports Server (NTRS)

    Nevins, J. L.; Defazio, T. L.; Seltzer, D. S.; Whitney, D. E.

    1981-01-01

    The initial set of requirements for additional studies necessary to implement a space-borne, computer-based work system capable of achieving assembly, disassembly, repair, or maintenance in space were developed. The specific functions required of a work system to perform repair and maintenance were discussed. Tasks and relevant technologies were identified and delineated. The interaction of spacecraft design and technology options, including a consideration of the strategic issues of repair versus retrieval-replacement or destruction by removal were considered along with the design tradeoffs for accomplishing each of the options. A concept system design and its accompanying experiment or test plan were discussed.

  1. Astronaut Pierre Thuot works with Middeck O-Gravity Dynamics Experiment

    NASA Image and Video Library

    1994-03-04

    STS062-52-025 (4-18 March 1994) --- Astronaut Pierre J. Thuot, mission specialist, works with the Middeck 0-Gravity Dynamics Experiment (MODE) aboard the earth-orbiting Space Shuttle Columbia. The reusable test facility is designed to study the nonlinear, gravity-dependent behavior of two types of space hardware -- contained fluids and (as depicted here) large space structures -- planned for future spacecraft.

  2. Astronaut Sam Gemar works with Middeck O-Gravity Dynamics Experiment (MODE)

    NASA Image and Video Library

    1994-03-04

    STS062-23-017 (4-18 March 1994) --- Astronaut Charles D. (Sam) Gemar, mission specialist, works with Middeck 0-Gravity Dynamics Experiment (MODE) aboard the earth-orbiting Space Shuttle Columbia. The reusable test facility is designed to study the nonlinear, gravity-dependent behavior of two types of space hardware -- contained fluids and (as depicted here) large space structures -- planned for future spacecraft.

  3. The Effect of a Community Project on Sense of Community among Social Work Students: An Exploratory Evaluative Study

    ERIC Educational Resources Information Center

    Boehm, Amnon; Moin, Victor

    2014-01-01

    This article evaluates the effect of a community project that was adopted by the students of a school of social work in Israel. A quasi-experimental pretest-posttest design was used. The pretest was administered during the planning stage of the project and the posttest a year later, during the implementation period. The findings show a significant…

  4. The Remote Observing Working Group for the Asteroid Impact and Deflection Assessment (AIDA)

    NASA Astrophysics Data System (ADS)

    Rivkin, A. S.; Pravec, P.; Thomas, C. A.; Thirouin, A.; Snodgrass, C.; Green, S.; Licandro, J.; Sickafoose, A. A.; Erasmus, N.; Howell, E. S.; Osip, D.; Thomas-Osip, J.; Moskovitz, N.; Scheirich, P.; Oszkiewicz, D.; Richardson, D. C.; Polishook, D.; Ryan, W. H.; Busch, M. W.

    2017-09-01

    The Asteroid Impact and Deflection Assessment (AIDA) is a joint US-European mission concept designed to demonstrate the effectiveness of an kinetic impactor for planetary defense. Ground-based observing is a key component to AIDA and critical for its success. We present the observing campaign we have been conducting of the asteroid Didymos, the AIDA target, and plans for future work.

  5. How to Do Science From an Engineering Organization

    NASA Technical Reports Server (NTRS)

    Suggs, Robert M.

    2003-01-01

    MSFC's Space Environments Team performs engineering support for a number of NASA spaceflight projects by defining the space environment, developing design requirements, supporting the design process, and supporting operations. Examples of this type of support are given including meteoroid environment work for the Jovian Icy Moon Orbiter mission, ionizing radiation support for the Chandra X-Ray Observatory, and astronomicaVgeophysica1 observation planning for International Space Station.

  6. Promoting Higher Order Thinking Skills via IPTEACES e-Learning Framework in the Learning of Information Systems Units

    ERIC Educational Resources Information Center

    Isaias, Pedro; Issa, Tomayess; Pena, Nuno

    2014-01-01

    When developing and working with various types of devices from a supercomputer to an iPod Mini, it is essential to consider the issues of Human Computer Interaction (HCI) and Usability. Developers and designers must incorporate HCI, Usability and user satisfaction in their design plans to ensure that systems are easy to learn, effective,…

  7. Launching to the Moon, Mars, and Beyond

    NASA Technical Reports Server (NTRS)

    Shivers, C. Herbert

    2008-01-01

    This viewgraph presentation reviews the planned launching to the Moon, and Mars. It is important to build beyond the capacity to ferry astronauts and cargo to low Earth orbit. NASA is starting to design new vehicles using the past lessons to minimize cost, and technical risks. The training and education of engineers that will continue the work of designing, testing and flying the vehicles is important to NASA.

  8. Day Care in Vermont: An Evaluation of the Vermont Model FAP Child Care Service System.

    ERIC Educational Resources Information Center

    Siedman, Eileen

    This book presents an extensive examination of the organization and operation of the Vermont model day care delivery system which was designed in the context of the proposed Family Assistance Plan (FAP). The model tested the ability of Federal and State employees to work together and share resources in designing a new approach to welfare reform.…

  9. Space architecture monograph series. Volume 4: Genesis 2: Advanced lunar outpost

    NASA Technical Reports Server (NTRS)

    Fieber, Joseph P.; Huebner-Moths, Janis; Paruleski, Kerry L.; Moore, Gary T. (Editor)

    1991-01-01

    This research and design study investigated advanced lunar habitats for astronauts and mission specialists on the Earth's moon. Design recommendations are based on environmental response to the lunar environment, human habitability (human factors and environmental behavior research), transportability (structural and materials system with least mass), constructability (minimizing extravehicular time), construction dependability and resilience, and suitability for NASA launch research missions in the 21st century. The recommended design uses lunar lava tubes, with construction being a combination of Space Station Freedom derived hard modules and light weight Kevlar laminate inflatable structures. The proposed habitat includes research labs and a biotron, crew quarters and crew support facility, mission control, health maintenance facility, maintenance work areas for psychological retreat, privacy, and comtemplation. Furniture, specialized equipment, and lighting are included in the analysis and design. Drawings include base master plans, construction sequencing, overall architectural configuration, detailed floor plans, sections and axonometrics, with interior perspectives.

  10. The Columbia River Protection Supplemental Technologies Quality Assurance Project Plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Fix, N. J.

    Pacific Northwest National Laboratory researchers are working on the Columbia River Protection Supplemental Technologies Project. This project is a U. S. Department of Energy, Office of Environmental Management-funded initiative designed to develop new methods, strategies, and technologies for characterizing, modeling, remediating, and monitoring soils and groundwater contaminated with metals, radionuclides, and chlorinated organics. This Quality Assurance Project Plan provides the quality assurance requirements and processes that will be followed by the Technologies Project staff.

  11. A dynamic case-based planning system for space station application

    NASA Technical Reports Server (NTRS)

    Oppacher, F.; Deugo, D.

    1988-01-01

    We are currently investigating the use of a case-based reasoning approach to develop a dynamic planning system. The dynamic planning system (DPS) is designed to perform resource management, i.e., to efficiently schedule tasks both with and without failed components. This approach deviates from related work on scheduling and on planning in AI in several aspects. In particular, an attempt is made to equip the planner with an ability to cope with a changing environment by dynamic replanning, to handle resource constraints and feedback, and to achieve some robustness and autonomy through plan learning by dynamic memory techniques. We briefly describe the proposed architecture of DPS and its four major components: the PLANNER, the plan EXECUTOR, the dynamic REPLANNER, and the plan EVALUATOR. The planner, which is implemented in Smalltalk, is being evaluated for use in connection with the Space Station Mobile Service System (MSS).

  12. Reengineering the project design process

    NASA Astrophysics Data System (ADS)

    Kane Casani, E.; Metzger, Robert M.

    1995-01-01

    In response to the National Aeronautics and Space Administration's goal of working faster, better, and cheaper, the Jet Propulsion Laboratory (JPL) has developed extensive plans to minimize cost, maximize customer and employee satisfaction, and implement small- and moderate-size missions. These plans include improved management structures and processes, enhanced technical design processes, the incorporation of new technology, and the development of more economical space- and ground-system designs. The Laboratory's new Flight Projects Implementation Development Office has been chartered to oversee these innovations and the reengineering of JPL's project design process, including establishment of the Project Design Center (PDC) and the Flight System Testbed (FST). Reengineering at JPL implies a cultural change whereby the character of the Laboratory's design process will change from sequential to concurrent and from hierarchical to parallel. The Project Design Center will support missions offering high science return, design to cost, demonstrations of new technology, and rapid development. Its computer-supported environment will foster high-fidelity project life-cycle development and more accurate cost estimating. These improvements signal JPL's commitment to meeting the challenges of space exploration in the next century.

  13. Integration of bicycling and walking facilities into the infrastructure of urban communities.

    DOT National Transportation Integrated Search

    2012-02-01

    Several manuals, handbooks and web resources exist to provide varied guidance on planning for and designing bicycle and pedestrian facilities, yet there are no specific indications about which of the varied treatments in these guides work well for us...

  14. Integration of Bicycling and Walking Facilities into the Infrastructure of Urban Communities

    DOT National Transportation Integrated Search

    2012-02-01

    Several manuals, handbooks and web resources exist to provide varied guidance on planning for and designing bicycle and pedestrian facilities, yet there are no specific indications about which of the varied treatments in these guides work well for us...

  15. Work Plans.

    ERIC Educational Resources Information Center

    Zemsky, Robert; Shaman, Susan; Shapiro, Daniel B.

    2001-01-01

    Proposes a set of axioms, rules, and practical tools that campuses can use when they ask: What is our market position and is repositioning possible? The tools are designed to help higher education institutional leaders and researchers achieve the goal of being both market smart and mission centered. (EV)

  16. Research Program Office of Statewide Planning and Research : State Fiscal Year 2011 Annual Report

    DOT National Transportation Integrated Search

    2011-01-01

    This annual report is designed to share program activities and results for Ohio Department of : Transportations research program. In addition to work on the projects shown in the body of : the report, 2011 accomplishments include: increasing engag...

  17. Air Tight: Building Inflatables/Inflatable Construction: Planning and Details

    NASA Technical Reports Server (NTRS)

    Kennedy, Kriss J.

    2016-01-01

    A design-build seminar consisting of students from Physics, Mechanical and Civil Engineering, Robotic, Material Science, Art, and Architecture who will work together on a deployable "closed-loop" inflatable greenhouse for Mars in theory, and an Earth analogue physical mockup on campus.

  18. 40 CFR 35.2105 - Debarment and suspension.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... unit of government for facilities planning or design work whose name appears on the master list of... applicant should be found non-responsible under part 30 of this subchapter or be the subject of possible debarment or suspension under part 32 of this subchapter. ...

  19. Pawcatuck School.

    ERIC Educational Resources Information Center

    Randall, Kathleen

    1993-01-01

    Describes how renovation can transform a school to a state-of-the-art facility without having to work from the ground up. Examined are the planning and design phases, the outer structure upgrading, the installation of more efficient heating, ventilation, and air conditioning systems, and renovation costs. (GR)

  20. Bringing SARA to School.

    ERIC Educational Resources Information Center

    Gavin, Thomas A.

    2000-01-01

    Well-designed problem-solving plans have something metal detectors and security cameras lack: proof of success. SARA, an acronym for Scanning, Analysis, Response, and Assessment, was shown to increase school safety in districts in Charlotte, North Carolina, and St. Petersburg, Florida. Program workings are explained. (MLH)

  1. 40 CFR 40.115-1 - Construction.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... investigations and studies, surveys, designs, plans, working drawings, specifications, procedures, and other... 40 Protection of Environment 1 2011-07-01 2011-07-01 false Construction. 40.115-1 Section 40.115-1 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GRANTS AND OTHER FEDERAL ASSISTANCE RESEARCH AND...

  2. 40 CFR 40.115-1 - Construction.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... investigations and studies, surveys, designs, plans, working drawings, specifications, procedures, and other... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Construction. 40.115-1 Section 40.115-1 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GRANTS AND OTHER FEDERAL ASSISTANCE RESEARCH AND...

  3. 40 CFR 40.115-1 - Construction.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... investigations and studies, surveys, designs, plans, working drawings, specifications, procedures, and other... 40 Protection of Environment 1 2013-07-01 2013-07-01 false Construction. 40.115-1 Section 40.115-1 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GRANTS AND OTHER FEDERAL ASSISTANCE RESEARCH AND...

  4. 40 CFR 40.115-1 - Construction.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... investigations and studies, surveys, designs, plans, working drawings, specifications, procedures, and other... 40 Protection of Environment 1 2014-07-01 2014-07-01 false Construction. 40.115-1 Section 40.115-1 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GRANTS AND OTHER FEDERAL ASSISTANCE RESEARCH AND...

  5. 40 CFR 40.115-1 - Construction.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... investigations and studies, surveys, designs, plans, working drawings, specifications, procedures, and other... 40 Protection of Environment 1 2012-07-01 2012-07-01 false Construction. 40.115-1 Section 40.115-1 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GRANTS AND OTHER FEDERAL ASSISTANCE RESEARCH AND...

  6. 48 CFR 15.404-4 - Profit.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ..., the contracting officer shall exclude from the pre-negotiation cost objective amounts the purchase.... 254(b): (A) For experimental, developmental, or research work performed under a cost-plus-fixed-fee... for production and delivery of designs, plans, drawings, and specifications shall not exceed 6 percent...

  7. 48 CFR 15.404-4 - Profit.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ..., the contracting officer shall exclude from the pre-negotiation cost objective amounts the purchase.... 254(b): (A) For experimental, developmental, or research work performed under a cost-plus-fixed-fee... for production and delivery of designs, plans, drawings, and specifications shall not exceed 6 percent...

  8. 48 CFR 15.404-4 - Profit.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ..., the contracting officer shall exclude from the pre-negotiation cost objective amounts the purchase.... 3905): (A) For experimental, developmental, or research work performed under a cost-plus-fixed-fee... for production and delivery of designs, plans, drawings, and specifications shall not exceed 6 percent...

  9. 48 CFR 15.404-4 - Profit.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ..., the contracting officer shall exclude from the pre-negotiation cost objective amounts the purchase.... 254(b): (A) For experimental, developmental, or research work performed under a cost-plus-fixed-fee... for production and delivery of designs, plans, drawings, and specifications shall not exceed 6 percent...

  10. 48 CFR 15.404-4 - Profit.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ..., the contracting officer shall exclude from the pre-negotiation cost objective amounts the purchase.... 254(b): (A) For experimental, developmental, or research work performed under a cost-plus-fixed-fee... for production and delivery of designs, plans, drawings, and specifications shall not exceed 6 percent...

  11. The interplay of intention, autonomy, and sex with dietary planning: A conditional process model to predict fruit and vegetable intake.

    PubMed

    Lange, Daniela; Corbett, Jana; Lippke, Sonia; Knoll, Nina; Schwarzer, Ralf

    2015-11-01

    Dietary intentions are supposed to engender planning processes, which in turn stimulate dietary behaviour change. However, some studies failed to find such mediation effects, which suggest more complex and not yet unravelled relationships between these factors. One explanation may be that mediation works better under certain circumstances or only for specific subgroups. This study addresses this reasoning by examining autonomy beliefs and sex as putative moderators of the hypothesized mediation chain. In a longitudinal design with three measurement points in time (1 week and 1 month apart), 912 women and 214 men were surveyed. Planning, intention, dietary autonomy beliefs, and sex were used to predict fruit and vegetable intake within a conditional process model designed to identify mechanisms of change. The intention-planning-behaviour chain was qualified by a triple interaction involving autonomy beliefs and sex as moderators between intention and planning. Higher dietary autonomy resulted in higher levels of planning fruit and vegetable intake. For men, even in case of higher intention, at least medium levels of autonomy beliefs were necessary to facilitate planning processes. For women, already lower levels of autonomy beliefs can engender postintentional planning strategies and seem to even compensate lower intention. Intention and planning are key predictors of dietary change. However, these variables work better under specific conditions (with a sufficient level of autonomy), and differently in subgroups (men vs. women). These results may explain the inconsistent findings of previous studies on the mediating effect of planning and allow for a better description of the mechanisms by which intentions may influence behaviour. Statement of contribution What is already known on this subject? The adoption of health-enhancing dietary behaviours can be facilitated by intentions and planning. Planning to eat more fruit and vegetable helps to translate intentions into actual consumption. Fruit and vegetable intake levels are higher in women than in men. What does this study add? Dietary intentions engender more likely planning processes when perceived autonomy concerning food consumption is high. Dietary autonomy beliefs and sex moderate the intention-planning-behaviour chain. Among men, dietary planning is highest when both intentions and autonomy are high. © 2015 The British Psychological Society.

  12. Turbine Technology Team - An overview of current and planned activities relevant to the National Launch System (NLS)

    NASA Technical Reports Server (NTRS)

    Griffin, Lisa W.; Huber, Frank W.

    1992-01-01

    The current status of the activities and future plans of the Turbine Technology Team of the Consortium for Computational Fluid Dynamics is reviewed. The activities of the Turbine Team focus on developing and enhancing codes and models, obtaining data for code validation and general understanding of flows through turbines, and developing and analyzing the aerodynamic designs of turbines suitable for use in the Space Transportation Main Engine fuel and oxidizer turbopumps. Future work will include the experimental evaluation of the oxidizer turbine configuration, the development, analysis, and experimental verification of concepts to control secondary and tip losses, and the aerodynamic design, analysis, and experimental evaluation of turbine volutes.

  13. Comet rendezvous mission design using Solar Electric Propulsion

    NASA Technical Reports Server (NTRS)

    Sackett, L. L.; Hastrup, R. C.; Yen, C.-W. L.; Wood, L. J.

    1979-01-01

    A dual comet (Halley Flyby/Tempel 2 Rendezvous) mission, which is planned to be the first to use the Solar Electric Propulsion System (SEPS), is to be launched in 1985. The purpose of this paper is to describe how the mission design attempts to maximize science return while working within spacecraft and other constraints. Science requirements and desires are outlined and specific instruments are considered. Emphasis is on the strategy for operations in the vicinity of Tempel 2, for which a representative profile is described. The mission is planned to extend about one year past initial rendezvous. Because of the large uncertainty in the comet environment the Tempel 2 operations strategy must be highly adaptive.

  14. Support to the Air Force Installation and Mission Support Center: Enabling AFIMSC’s Role in Agile Combat Support Planning, Execution, Monitoring, and Control

    DTIC Science & Technology

    2017-06-23

    field of organizational design is that decisions should be made by those who have the necessary information, something AFIMSC does not yet have. See...data system designator , D087X. EXPRESS is the Air Force’s implemented version of the tool DRIVE, which was developed at RAND in the early 1990s. The...The UMMIPS system could also serve as a pattern. UMMIPS works by assigning a priority designator based on a force activity designator (FAD) (the

  15. Integrated risk management

    NASA Technical Reports Server (NTRS)

    Hunsucker, J. L.

    1993-01-01

    The purpose of this report is to first present a basis or foundation for the building of an integrated risk management plan and them to present the plan. The integration referred to is across both the temporal and the hierarchical dimensions. Complexity, consequence, and credibility seem to be driving the need for the consideration of risk. Reduction of personal bias and reproducibility of the decision making process seem to be driving the consideration of a formal risk plan. While risk can be used as either a selection tool or a control tool, this paper concentrates on the selection usage. Risk relies on stated purpose. The tightness of the definition of purpose and success is directly reflected in the definition and control of risk. Much of a risk management plan could be designed by the answers to the questions of why, what, who, when, and where. However, any plan must provide the following information about a threat or risk: likelihood, consequence, predictability, reliability, and reproducibility. While the environment at NASA is seen as warm, but not hot, for the introduction of a risk program, some encouragement is seen if the following problems are addressed: no champion, no commitment of resource, confused definitions, lack of direction and focus, a hard sell, NASA culture, many choices of assessment methods, and cost. The plan is designed to follow the normal method of doing work and is structured to follow either the work break down structure or a functional structure very well. The parts of the plan include: defining purpose and success, initial threat assessment, initial risk assessment, reconciling threats and parameters, putting part of the information down and factoring the information back into the decision process as it comes back up, and developing inferences. Two major suggestions are presented. One is to build an office of risk management to be used as a resource by managers in doing the risk process. Another is to form a pilot program to try out the details in the plan and modify the method where needed.

  16. Transition from an open-plan to a two-cot neonatal intensive care unit: a participatory action research approach.

    PubMed

    Broom, Margaret; Gardner, Anne; Kecskes, Zsuzsoka; Kildea, Sue

    2017-07-01

    To facilitate staff transition from an open-plan to a two-cot neonatal intensive care unit design. In 2012, an Australian regional neonatal intensive care unit transitioned from an open-plan to a two-cot neonatal intensive care unit design. Research has reported single- and small-room neonatal intensive care unit design may negatively impact on the distances nurses walk, reducing the time they spend providing direct neonatal care. Studies have also reported nurses feel isolated and need additional support and education in such neonatal intensive care units. Staff highlighted their concerns regarding the impact of the new design on workflow and clinical practice. A participatory action research approach. A participatory action group titled the Change and Networking Group collaborated with staff over a four-year period (2009-2013) to facilitate the transition. The Change and Networking Group used a collaborative, cyclical process of planning, gathering data, taking action and reviewing the results to plan the next action. Data sources included meeting and workshop minutes, newsletters, feedback boards, subgroup reports and a staff satisfaction survey. The study findings include a description of (1) how the participatory action research cycles were used by the Change and Networking Group: providing examples of projects and strategies undertaken; and (2) evaluations of participatory action research methodology and Group by neonatal intensive care unit staff and Change and Networking members. This study has described the benefits of using participatory action research to facilitate staff transition from an open-plan to a two-cot neonatal intensive care unit design. Participatory action research methodology enabled the inclusion of staff to find solutions to design and clinical practice questions. Future research is required to assess the long-term effect of neonatal intensive care unit design on staff workload, maintaining and supporting a skilled workforce as well as the impact of a new neonatal intensive care unit design on the neonatal intensive care unit culture. A supportive work environment for staff is critical in providing high-quality health care. © 2016 John Wiley & Sons Ltd.

  17. Scoping Planning Agents With Shared Models

    NASA Technical Reports Server (NTRS)

    Bedrax-Weiss, Tania; Frank, Jeremy D.; Jonsson, Ari K.; McGann, Conor

    2003-01-01

    In this paper we provide a formal framework to define the scope of planning agents based on a single declarative model. Having multiple agents sharing a single model provides numerous advantages that lead to reduced development costs and increase reliability of the system. We formally define planning in terms of extensions of an initial partial plan, and a set of flaws that make the plan unacceptable. A Flaw Filter (FF) allows us to identify those flaws relevant to an agent. Flaw filters motivate the Plan Identification Function (PIF), which specifies when an agent is is ready hand control to another agent for further work. PIFs define a set of plan extensions that can be generated from a model and a plan request. FFs and PIFs can be used to define the scope of agents without changing the model. We describe an implementation of PIFsand FFswithin the context of EUROPA, a constraint-based planning architecture, and show how it can be used to easily design many different agents.

  18. Mixed-Initiative Planning and Scheduling for Science Missions

    NASA Technical Reports Server (NTRS)

    Myers, Karen L.; Wolverton, Michael J.

    2004-01-01

    The objective of this joint NASA Ames/JPL/SRI project was to develop mixed-initiative planning and scheduling technology that would enable more effective and efficient planning of science missions. The original intent behind the project was to have all three organizations work closely on the overall research and technology development objectives. Shortly after the project began, however, the Ames and JPL project members made a commitment to develop and field an operational mixed-initiative planning and scheduling tool called MAPGEN for the 2003 Mars Exploration Rover (MER) mission [Ai-Chang et al. 2003]. Because of the tremendous amounts of time and effort that went into making that tool a success, the Ames and JPL personnel were mostly unavailable for collaboration on the joint objectives of the original proposal. Until November of 2002, SRI postponed work on the project in the hope that the Ames and JPL personnel would be able to find time for the planned collaborative research. During discussions between Dr. Karen Myers (the SRI institutional PI) and Dr. John Bresina (the project PI) during November of 2002, it was mutually agreed that SRI should work independently to achieve some of the research objectives for the project. In particular, Dr. Bresina identified explanation of plans and planner behavior as a critical area for research, based on feedback from demonstrating an initial prototype of MAPGEN to the operational community. For that reason, our focus from November of 2002 through the end of the project was on designing explanation methods to address this need.

  19. Thinking about the patient's wishes: practical wisdom of discharge planning nurses in assisting surrogate decision-making.

    PubMed

    Kageyama, Yoko; Asano, Midori

    2017-12-01

    The accelerating trend towards shorter hospital stays in Japan has made modes of decision-making essential for effective patient transition from the hospital to recuperation in the regional community, and the ageing of the population has brought a rise in surrogate decision-making by the families of patients lacking decision-making ('self-decision') capacity. To verbalise and elucidate the practical wisdom of discharge planning nurses by focusing on the perceptions and judgements, they apply in practice and describing their methodology in concrete terms. Participants were six discharge planning nurses and one person with previous experience as a discharge planning nurse, all working at discharge planning departments of acute care hospitals. Separate, semi-structured, interactive interviews were conducted with each participant. The study design was qualitative descriptive in form with qualitative content analysis. All participants provided written informed consent to participate in the study, which was approved by the study institution. Three concepts were extracted as the basis for discharge planning nurses' perception and judgement at acute care hospitals: working for mutual envisionment of the available postdischarge options; helping the family act as spokesperson(s) for the patient's wishes; and understanding the family inclusive of the patient as a relationship of strongly interaffecting interests. The practical wisdom of the nurse, working in mutual envisionment with the family, and collaborative decision-making through discussion with those who know the patient, leads to rational discharge assistance. © 2017 Nordic College of Caring Science.

  20. A comprehensive plan for helicopter drag reduction

    NASA Technical Reports Server (NTRS)

    Williams, R. M.; Montana, P. S.

    1975-01-01

    Current helicopters have parasite drag levels 6 to 10 times as great as fixed wing aircraft. The commensurate poor cruise efficiency results in a substantial degradation of potential mission capability. The paper traces the origins of helicopter drag and shows that the problem (primarily due to bluff body flow separation) can be solved by the adoption of a comprehensive research and development plan. This plan, known as the Fuselage Design Methodology, comprises both nonaerodynamic and aerodynamic aspects. The aerodynamics are discussed in detail and experimental and analytical programs are described which will lead to a solution of the bluff body problem. Some recent results of work conducted at the Naval Ship Research and Development Center (NSRDC) are presented to illustrate these programs. It is concluded that a 75-per cent reduction of helicopter drag is possible by the full implementation of the Fuselage Design Methodology.

  1. Design and development of progressive tool for manufacturing washer

    NASA Astrophysics Data System (ADS)

    Annigeri, Ulhas K.; Raghavendra Ravi Kiran, K.; Deepthi, Y. P.

    2017-07-01

    In a progressive tool the raw material is worked at different station to finally fabricate the component. A progressive tool is a lucrative tool for mass production of components. A lot of automobile and other transport industries develop progressive tool for the production of components. The design of tool involves lot of planning and the same amount of skill of process planning is required in the fabrication of the tool. The design also involves use of thumb rules and standard elements as per experience gained in practice. Manufacturing the press tool is a laborious task as special jigs and fixtures have to be designed for the purpose. Assembly of all the press tool elements is another task where use of accurate measuring instruments for alignment of various tool elements is important. In the present study, design and fabrication of progressive press tool for production of washer has been developed and the press tool has been tried out on a mechanical type of press. The components produced are to dimensions.

  2. DE-EE0006714 Final Report-Project Icebreaker™

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Wagner, Lorry; Karpinski, David; Nagusky, Beth

    Project Icebreaker, a 20 Megawatt offshore wind project 8 miles north of Cleveland, OH in Lake Erie, has been under development by the Lake Erie Energy Development Corporation since 2009. Significant development efforts were completed prior to the award of DE-EE0006714 (December 2014). This report describes the status of the work performed under award DE-EE0006714. The work was organized into several categories or tasks. The report presents the status of that work in each of eleven (11) main tasks: 1) State and Federal Permits; 2) Mono Bucket Foundation Engineering; 3) Construction and Installation Engineering; 4) Cable Route Survey; 5) Electricalmore » System Design; 6) Power Off-take; 7) Project Costs and Risk Management; 8) Operations and Maintenance Planning; 9) Domestic Supply Chain Development; 10) Instrumentation Planning; and 11) Department of Energy Review.« less

  3. In-service evaluation of major urban arterials with landscaped medians : phase III.

    DOT National Transportation Integrated Search

    2013-06-01

    Several cities have implemented redevelopment plans that include the re-design of major regional arterials in order to raise the quality of life of those living, working, and shopping along, or near the arterial. Many of these redevelopment efforts i...

  4. Teaching Art + Math

    ERIC Educational Resources Information Center

    McIntosh, Ronald D.

    2008-01-01

    Professional learning communities (PLCs) are designed to increase and improve the time teachers spend working with one another planning curriculum for mathematics, reading, writing, history, English, and other disciplines offered by their school. These meetings help to improve test scores in math and English. Teachers have coupled their subject…

  5. School Building Organisation in Greece.

    ERIC Educational Resources Information Center

    PEB Exchange, 2001

    2001-01-01

    Discusses the past and current organizational structure of Greece's School Building Organisation, a body established to work with government agencies in the design and construction of new buildings and the provisioning of educational equipment. Future planning to incorporate culture and creativity, sports, and laboratory learning in modern school…

  6. Psychological effectiveness of carbon labelling

    NASA Astrophysics Data System (ADS)

    Beattie, Geoffrey

    2012-04-01

    Despite the decision by supermarket-giant Tesco to delay its plan to add carbon-footprint information onto all of its 70,000 products, carbon labelling, if carefully designed, could yet change consumer behaviour. However, it requires a new type of thinking about consumers and much additional work.

  7. Parent-Aided Homework: A Working Model for School Personnel.

    ERIC Educational Resources Information Center

    Harris, James R.

    1983-01-01

    Describes Parent-Aided Homework, a behavior modification program designed to encourage parent involvement in their child's homework. The PAH plan stresses positive reinforcement for successfully completed homework assignments. Parents enforce the agreed-on time limits and provide extra learning experiences and rewards. (JAC)

  8. A Five-Level Articulated Program

    ERIC Educational Resources Information Center

    Cobin, Joan; And Others

    1976-01-01

    Working collaboratively, five community colleges and three universities designed a multiple entry and exit educational system that would meet the needs of both nurses and employers. The plan provides nursing education at five levels (from nurse's aide to master's degree) allowing continuous progression between levels. (Author/MS)

  9. Distributed Observer Network

    NASA Technical Reports Server (NTRS)

    2008-01-01

    NASA s advanced visual simulations are essential for analyses associated with life cycle planning, design, training, testing, operations, and evaluation. Kennedy Space Center, in particular, uses simulations for ground services and space exploration planning in an effort to reduce risk and costs while improving safety and performance. However, it has been difficult to circulate and share the results of simulation tools among the field centers, and distance and travel expenses have made timely collaboration even harder. In response, NASA joined with Valador Inc. to develop the Distributed Observer Network (DON), a collaborative environment that leverages game technology to bring 3-D simulations to conventional desktop and laptop computers. DON enables teams of engineers working on design and operations to view and collaborate on 3-D representations of data generated by authoritative tools. DON takes models and telemetry from these sources and, using commercial game engine technology, displays the simulation results in a 3-D visual environment. Multiple widely dispersed users, working individually or in groups, can view and analyze simulation results on desktop and laptop computers in real time.

  10. Analysis of post-mining excavations as places for municipal waste

    NASA Astrophysics Data System (ADS)

    Górniak-Zimroz, Justyna

    2018-01-01

    Waste management planning is an interdisciplinary task covering a wide range of issues including costs, legal requirements, spatial planning, environmental protection, geography, demographics, and techniques used in collecting, transporting, processing and disposing of waste. Designing and analyzing this issue is difficult and requires the use of advanced analysis methods and tools available in GIS geographic information systems containing readily available graphical and descriptive databases, data analysis tools providing expert decision support while selecting the best-designed alternative, and simulation models that allow the user to simulate many variants of waste management together with graphical visualization of the results of performed analyzes. As part of the research study, there have been works undertaken concerning the use of multi-criteria data analysis in waste management in areas located in southwestern Poland. These works have proposed the inclusion in waste management of post-mining excavations as places for the final or temporary collection of waste assessed in terms of their suitability with the tools available in GIS systems.

  11. The Design, Planning and Control of Robotic Systems in Space

    NASA Technical Reports Server (NTRS)

    Dubowsky, Steven

    1996-01-01

    In the future, robotic systems will be expected to perform important tasks in space, in orbit and in planetary exploration. In orbit, current technology requires that tasks such as the repair, construction and maintenance of space stations and satellites be performed by astronaut Extra Vehicular Activity (EVA). Eliminating the need for astronaut EVA through the use of space manipulators would greatly reduce both mission costs and hazards to astronauts. In planetary exploration, cost and logistical considerations clearly make the use of autonomous and telerobotic systems also very attractive, even in cases where an astronaut explorer might be in the area. However, such applications introduce a number of technical problems not found in conventional earth-bound industrial robots. To design useful and practical systems to meet the needs of future space missions, substantial technical development is required, including in the areas of the design, control and planning. The objectives of this research program were to develop such design paradigms and control and planning algorithms to enable future space robotic systems to meet their proposed mission objectives. The underlying intellectual focus of the program is to construct a set of integrated design, planning and control techniques based on an understanding of the fundamental mechanics of space robotic systems. This work was to build upon the results obtained in our previous research in this area supported by NASA Langley Research Center in which we have made important contributions to the area of space robotics.

  12. How language production shapes language form and comprehension

    PubMed Central

    MacDonald, Maryellen C.

    2012-01-01

    Language production processes can provide insight into how language comprehension works and language typology—why languages tend to have certain characteristics more often than others. Drawing on work in memory retrieval, motor planning, and serial order in action planning, the Production-Distribution-Comprehension (PDC) account links work in the fields of language production, typology, and comprehension: (1) faced with substantial computational burdens of planning and producing utterances, language producers implicitly follow three biases in utterance planning that promote word order choices that reduce these burdens, thereby improving production fluency. (2) These choices, repeated over many utterances and individuals, shape the distributions of utterance forms in language. The claim that language form stems in large degree from producers' attempts to mitigate utterance planning difficulty is contrasted with alternative accounts in which form is driven by language use more broadly, language acquisition processes, or producers' attempts to create language forms that are easily understood by comprehenders. (3) Language perceivers implicitly learn the statistical regularities in their linguistic input, and they use this prior experience to guide comprehension of subsequent language. In particular, they learn to predict the sequential structure of linguistic signals, based on the statistics of previously-encountered input. Thus, key aspects of comprehension behavior are tied to lexico-syntactic statistics in the language, which in turn derive from utterance planning biases promoting production of comparatively easy utterance forms over more difficult ones. This approach contrasts with classic theories in which comprehension behaviors are attributed to innate design features of the language comprehension system and associated working memory. The PDC instead links basic features of comprehension to a different source: production processes that shape language form. PMID:23637689

  13. FY 1986 current fiscal year work plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    This Current Year Work Plan presents in detail a description of the activities to be performed by the Joint Integration Office/RI during FY86. It breaks down the activities into two major work areas: Program Management and Program Analysis. Program Management is performed by the JIO/RI by providing technical planning and guidance for the development of advanced TRU waste management capabilities. This includes equipment/facility design, engineering, construction, and operations. These functions are integrated to allow transition from interim storage to final disposition. JIO/RI tasks include program requirements identification, long-range technical planning, budget development, program planning document preparation, task guidance development, taskmore » monitoring, task progress information gathering and reporting to DOE, interfacing with other agencies and DOE lead programs, integrating public involvement with program efforts, and preparation of reports for DOE detailing program status. Program Analysis is performed by the JIO/RI to support identification and assessment of alternatives, and development of long-term TRU waste program capabilities. These analyses include short term analyses in response to DOE information requests, along with performing an RH Cost/Schedule Optimization report. System models will be developed, updated, and upgraded as needed to enhance JIO/RI's capability to evaluate the adequacy of program efforts in various fields. A TRU program data base will be maintained and updated to provide DOE with timely responses to inventory related questions.« less

  14. Hybrid Electro-Optic Processor

    DTIC Science & Technology

    1991-07-01

    This report describes the design of a hybrid electro - optic processor to perform adaptive interference cancellation in radar systems. The processor is...modulator is reported. Included is this report is a discussion of the design, partial fabrication in the laboratory, and partial testing of the hybrid electro ... optic processor. A follow on effort is planned to complete the construction and testing of the processor. The work described in this report is the

  15. Focused Feasibility Study Final Field Sampling Plan

    DTIC Science & Technology

    1993-10-01

    baseline of groundwater chemistry prior to commencing additional environmental investigations of the area. Work for Phase I of the FFS is designed lo...investigations and remedial feasibility investigations at Beach Point. The groundwater data will also be used to aid in the design of any groundwater extraction...approved laboratories. The analytical data will be the equivalent of EPA Level IV data. This level of data quality has been established for environmental

  16. Changes in the Precision of a Study from Planning Phase to Implementation Phase: Evidence from the First Wave of Group Randomized Trials Launched by the Institute of Education Sciences

    ERIC Educational Resources Information Center

    Spybrook, Jessaca; Lininger, Monica; Cullen, Anne

    2011-01-01

    The purpose of this study is to extend the work of Spybrook and Raudenbush (2009) and examine how the research designs and sample sizes changed from the planning phase to the implementation phase in the first wave of studies funded by IES. The authors examine the impact of the changes in terms of the changes in the precision of the study from the…

  17. Methodological Considerations in the Design of Large Scale Systems Engineering Processes.

    DTIC Science & Technology

    1981-02-01

    phases as policy and proqram planning, project planning, system development , etc. 32 ro4- E V4-) C 0 (U JW 4-) L > U>) EWQ S -4-) (D4-) S - u 4-- , 4 U...orocedurally or substantively acceptable behavior, in either a descriptive or normative sense, in any specific circumstance. Prospect theory developed by...into a conceptual model of cognitive activity is contained in the works of Piaget ** , the founder of "genetic epistemology". According to Piaget

  18. Research and applications: Artificial intelligence

    NASA Technical Reports Server (NTRS)

    Raphael, B.; Duda, R. O.; Fikes, R. E.; Hart, P. E.; Nilsson, N. J.; Thorndyke, P. W.; Wilber, B. M.

    1971-01-01

    Research in the field of artificial intelligence is discussed. The focus of recent work has been the design, implementation, and integration of a completely new system for the control of a robot that plans, learns, and carries out tasks autonomously in a real laboratory environment. The computer implementation of low-level and intermediate-level actions; routines for automated vision; and the planning, generalization, and execution mechanisms are reported. A scenario that demonstrates the approximate capabilities of the current version of the entire robot system is presented.

  19. Missile and Space Systems Reliability versus Cost Trade-Off Study

    DTIC Science & Technology

    1983-01-01

    F00-1C09 Robert C. Schneider F00-1C09 V . PERFORMING ORGANIZATION NAME AM0 ADDRESS 16 PRGRAM ELEMENT. PROJECT. TASK BoeingAerosace CmpAnyA CA WORK UNIT...reliability problems, which has the - real bearing on program effectiveness. A well planned and funded reliability effort can prevent or ferret out...failure analysis, and the in- corporation and verification of design corrections to prevent recurrence of failures. 302.2.2 A TMJ test plan shall be

  20. Coal gasification systems engineering and analysis. Volume 1: Executive summary

    NASA Technical Reports Server (NTRS)

    1980-01-01

    Feasibility analyses and systems engineering studies for a 20,000 tons per day medium Btu (MBG) coal gasification plant to be built by TVA in Northern Alabama were conducted. Major objectives were as follows: (1) provide design and cost data to support the selection of a gasifier technology and other major plant design parameters, (2) provide design and cost data to support alternate product evaluation, (3) prepare a technology development plan to address areas of high technical risk, and (4) develop schedules, PERT charts, and a work breakdown structure to aid in preliminary project planning. Volume one contains a summary of gasification system characterizations. Five gasification technologies were selected for evaluation: Koppers-Totzek, Texaco, Lurgi Dry Ash, Slagging Lurgi, and Babcock and Wilcox. A summary of the trade studies and cost sensitivity analysis is included.

  1. TU-AB-303-03: CBCT-Based On-Site Simulation, Planning, and Delivery (OSPD) for Whole Brain Radiotherapy

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Le, A; Choe, K; Jiang, S

    2015-06-15

    Purpose: To demonstrate the feasibility of a CBCT-based on-site simulation, planning, and delivery (OSPD) for whole brain radiotherapy, in which all steps from imaging, planning to treatment delivery are performed at the treatment unit in one appointment time slot. This work serves as the proof of concept for future OSPD single fraction radiation therapy. Methods: An integrated on-site imaging, planning and delivery workflow was developed and tested for whole brain radiotherapy. An automated two-opposed-oblique-beam plan is created by utilizing the treatment planning system scripting and simple field-in-field IMRT. The IMRT plan is designed with maximum 8 control points to covermore » the target volume consisting of the brain to C1/C2 of the spinal cord, with dose homogeneity criteria from −5% to +7% of the prescription dose. Due to inaccuracy of reconstructed Hounsfield unit numbers in CBCT images, the dose distribution is calculated with non-heterogeneity correction introducing only clinically insignificant dose discrepancy. A coherent and synchronized workflow was designed for a team of attending physician, physicist, therapists, and dosimetrist to work closely with the ability to quickly modify, approve, and implement the treatment. Results: Thirty-one patients have been treated with this OSPD treatment, without compromising the plan quality compared to our regular clinically used parallel apposed 2D plans. The average time for these procedures are 48.02 ±11.55 minutes from the time patient entered the treatment room until s/he exited, and 35.09 ±10.35 minutes from starting CBCT until last beam delivered. This time duration is comparable to the net time when individual tasks are summed up during our regular CT- based whole brain planning and delivery. Conclusions: The OSPD whole brain treatment has been tested to be clinically feasible. The next step is to further improve the efficiency and to streamline the workflow. Other disease sites will be also tested with this new technology.« less

  2. The telerobot workstation testbed for the shuttle aft flight deck: A project plan for integrating human factors into system design

    NASA Technical Reports Server (NTRS)

    Sauerwein, Timothy

    1989-01-01

    The human factors design process in developing a shuttle orbiter aft flight deck workstation testbed is described. In developing an operator workstation to control various laboratory telerobots, strong elements of human factors engineering and ergonomics are integrated into the design process. The integration of human factors is performed by incorporating user feedback at key stages in the project life-cycle. An operator centered design approach helps insure the system users are working with the system designer in the design and operation of the system. The design methodology is presented along with the results of the design and the solutions regarding human factors design principles.

  3. Selenide isotope generator for the Galileo mission. Reliability program plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1978-10-01

    The reliability program plan for the Selenide Isotope Generator (SIG) program is presented. It delineates the specific tasks that will be accomplished by Teledyne Energy Systems and its suppliers during design, development, fabrication and test of deliverable Radioisotopic Thermoelectric Generators (RTG), Electrical Heated Thermoelectric Generators (ETG) and associated Ground Support Equipment (GSE). The Plan is formulated in general accordance with procedures specified in DOE Reliability Engineering Program Requirements Publication No. SNS-2, dated June 17, 1974. The Reliability Program Plan presented herein defines the total reliability effort without further reference to Government Specifications. The reliability tasks to be accomplished are delineatedmore » herein and become the basis for contract compliance to the extent specified in the SIG contract Statement of Work.« less

  4. Meeting IYA Goals for Diverse Science Center and Planetarium Audiences

    NASA Astrophysics Data System (ADS)

    Nichols Yehling, Michelle; Carney, K.

    2008-05-01

    The International Year of Astronomy provides the Adler Planetarium in Chicago, IL with a chance to bring astronomy into the greater Chicagoland area. 1) The presenters will outline Adler's program plans to date, from community outreach programs such as Café Scientifique and citizen science light pollution observations, to programs within the institution, like a temporary exhibit about how telescopes have shaped our understanding of the cosmos. The presenters will focus on the range of programming and how this suite of programs brings together IYA topical threads, addressing sustainability and the needs of our audiences. 2) How do we know that the IYA programs we design actually work for our audiences? How do we assess and improve our work? This session will introduce participants to the "backwards design” process through which Adler educators create experiences that begin with focused goals. Facilitators will take participants through the Adler's evaluation planning method that uncovers what we want to know about our educational programs and experiences. Tools for program design and evaluation will be shared. 3) Facilitators will present for discussion three activities that have been designed and evaluated for one of our audiences, the museum-going family. Workshop participants are invited to critique and discuss these activities, their rationale, their fit with identified audience and institutional needs, and IYA thematic strands. Participants will share any ideas they have for adaptation of these activities for other audiences in their own settings. 4) Finally, all of the educational design and evaluation tools, program descriptions, and lesson plans will be compiled into an electronic document. Participants are encouraged to bring program description examples and/or activity lesson plans that can be incorporated into the document to provide an IYA "workbook". This workbook will be sent to all interested session participants by no later than July 31, 2008.

  5. Quiet, Efficient Fans for Spaceflight: An Overview of NASA's Technology Development Plan

    NASA Technical Reports Server (NTRS)

    Koch, L. Danielle

    2010-01-01

    A Technology Development Plan to improve the aerodynamic and acoustic performance of spaceflight fans has been submitted to NASA s Exploration Technology Development Program. The plan describes a research program intended to make broader use of the technology developed at NASA Glenn to increase the efficiency and reduce the noise of aircraft engine fans. The goal is to develop a set of well-characterized government-owned fans nominally suited for spacecraft ventilation and cooling systems. NASA s Exploration Life Support community will identify design point conditions for the fans in this study. Computational Fluid Dynamics codes will be used in the design and analysis process. The fans will be built and used in a series of tests. Data from aerodynamic and acoustic performance tests will be used to validate performance predictions. These performance maps will also be entered into a database to help spaceflight fan system developers make informed design choices. Velocity measurements downstream of fan rotor blades and stator vanes will also be collected and used for code validation. Details of the fan design, analysis, and testing will be publicly reported. With access to fan geometry and test data, the small fan industry can independently evaluate design and analysis methods and work towards improvement.

  6. Integration of Palliative Care Principles into the Ongoing Care of Children with Cancer: Individualized Care Planning and Coordination

    PubMed Central

    Baker, Justin N; Hinds, Pamela S; Spunt, Sheri L; Barfield, Raymond C; Allen, Caitlin; Powell, Brent C; Anderson, Lisa H; Kane, Javier R

    2008-01-01

    Synopsis The Individualized Care Planning and Coordination Model is designed to integrate palliative care principles and practices into the ongoing care of children with cancer. Application of the model helps clinicians to generate a comprehensive individualized care plan that is implemented through Individualized Care Coordination processes as detailed here. Clinicians’ strong desire to provide compassionate, competent and sensitive care to the seriously ill child and the child’s family can be effectively translated into clinical practice through these processes. “To cure sometimes, to relieve often, to comfort always -- this is our work.” Author Unknown PMID:18242323

  7. Acquisition/expulsion system for earth orbital propulsion system study. Volume 4: Flight test article

    NASA Technical Reports Server (NTRS)

    1973-01-01

    Two orbital test plans were prepared to verify one of the passive cryogenic storage tank/feedline candidate designs. One plan considered the orbital test article to be launched as a dedicated payload using an Atlas F burner launching configuration. The second plan proposed to launch the orbital test article as a secondary payload on the Titan E/Centaur proof flight. The secondary payload concept was pursued until January 1973, when work to build the hardware for this phase of the contract was terminated for lack of a sponsor for the flight. The dedicated payload launched on an Atlas F is described.

  8. Oncology disease management.

    PubMed

    Fetterolf, Donald E; Terry, Rachel

    2007-02-01

    Oncologic conditions are ubiquitous medical illnesses that present a particular challenge for medical management programs designed to address quality and cost issues in patient populations. Disease management strategies represent a reasonable and effective approach for employers and health plans in their arsenal of health management strategies. Multiple reasons exist for the development of specialized disease management programs that deal with cancer patients, some unique to this group of individuals. Health plans and/or employers have solid justification for addressing these issues directly through programs developed specifically to work with cancer patients. Whether developed within a health plan, or "carved out" to an external vendor, proper evaluation of outcomes is essential.

  9. Factors Affecting Prepharmacy Students' Perceptions of the Professional Role of Pharmacists

    PubMed Central

    Plake, Kimberly S.; Newton, Gail D.; Mason, Holly L.

    2010-01-01

    Objective To assess prepharmacy students' perceptions of the professional role of pharmacists prior to enrollment in pharmacy school, and the association between perceptions and student demographics. Methods A 58-question survey instrument regarding pharmacists' roles, work experiences, and demographics was developed and administered to students (N = 127) enrolled in an organic chemistry laboratory experience at Purdue University. Results Theory of planned behavior subscales (attitude, subjective norm, perceived behavioral control) were influenced by students' grade point average, gender, and application to pharmacy school, while unpaid work experience affected professional commitment. Students evaluated work experience related to their pharmacy studies more positively than non-pharmacy-related areas in the theory of planned behavior subscales. Conclusions Evaluating students' perceptions may be beneficial in helping pharmacy educators design their curricula, as well as allowing admissions committees to select the most qualified students to promote the development of positive perceptions toward the professional role of pharmacists. Grade point average (GPA) and application to pharmacy school were associated with significant differences for the theory of planned behavior and professional commitment subscales. PMID:21301595

  10. Knowledge co-production and boundary work to promote implementation of conservation plans.

    PubMed

    Nel, Jeanne L; Roux, Dirk J; Driver, Amanda; Hill, Liesl; Maherry, Ashton C; Snaddon, Kate; Petersen, Chantel R; Smith-Adao, Lindie B; Van Deventer, Heidi; Reyers, Belinda

    2016-02-01

    Knowledge co-production and boundary work offer planners a new frame for critically designing a social process that fosters collaborative implementation of resulting plans. Knowledge co-production involves stakeholders from diverse knowledge systems working iteratively toward common vision and action. Boundary work is a means of creating permeable knowledge boundaries that satisfy the needs of multiple social groups while guarding the functional integrity of contributing knowledge systems. Resulting products are boundary objects of mutual interest that maintain coherence across all knowledge boundaries. We examined how knowledge co-production and boundary work can bridge the gap between planning and implementation and promote cross-sectoral cooperation. We applied these concepts to well-established stages in regional conservation planning within a national scale conservation planning project aimed at identifying areas for conserving rivers and wetlands of South Africa and developing an institutional environment for promoting their conservation. Knowledge co-production occurred iteratively over 4 years in interactive stake-holder workshops that included co-development of national freshwater conservation goals and spatial data on freshwater biodiversity and local conservation feasibility; translation of goals into quantitative inputs that were used in Marxan to select draft priority conservation areas; review of draft priority areas; and packaging of resulting map products into an atlas and implementation manual to promote application of the priority area maps in 37 different decision-making contexts. Knowledge co-production stimulated dialogue and negotiation and built capacity for multi-scale implementation beyond the project. The resulting maps and information integrated diverse knowledge types of over 450 stakeholders and represented >1000 years of collective experience. The maps provided a consistent national source of information on priority conservation areas for rivers and wetlands and have been applied in 25 of the 37 use contexts since their launch just over 3 years ago. When framed as a knowledge co-production process supported by boundary work, regional conservation plans can be developed into valuable boundary objects that offer a tangible tool for multi-agency cooperation around conservation. Our work provides practical guidance for promoting uptake of conservation science and contributes to an evidence base on how conservation efforts can be improved. © 2015 Society for Conservation Biology.

  11. Earthworks logistics in the high density urban development conditions - case study

    NASA Astrophysics Data System (ADS)

    Sobotka, A.; Blajer, M.

    2017-10-01

    Realisation of the construction projects on highly urbanised areas carries many difficulties and logistic problems. Earthworks conducted in such conditions constitute a good example of how important it is to properly plan the works and use the technical means of the logistics infrastructure. The construction processes on the observed construction site, in combination with their external logistics service are a complex system, difficult for mathematical modelling and achievement of appropriate data for planning the works. The paper shows describe and analysis of earthworks during construction of the Centre of Power Engineering of AGH in Krakow for two stages of a construction project. At the planning stage in the preparatory phase (before realization) and in the implementation phase of construction works (foundation). In the first case, an example of the use of queuing theory for prediction of excavation time under random work conditions of the excavator and the associated trucks is provided. In the second case there is a change of foundation works technology resulting as a consequence of changes in logistics earthworks. Observation of the construction has confirmed that the use of appropriate methods of construction works management, and in this case agile management, the time and cost of the project have not been exceeded. The success of a project depends on the ability of the contractor to react quickly when changes occur in the design, technology, environment, etc.

  12. Software synthesis using generic architectures

    NASA Technical Reports Server (NTRS)

    Bhansali, Sanjay

    1993-01-01

    A framework for synthesizing software systems based on abstracting software system designs and the design process is described. The result of such an abstraction process is a generic architecture and the process knowledge for customizing the architecture. The customization process knowledge is used to assist a designer in customizing the architecture as opposed to completely automating the design of systems. Our approach using an implemented example of a generic tracking architecture which was customized in two different domains is illustrated. How the designs produced using KASE compare to the original designs of the two systems, and current work and plans for extending KASE to other application areas are described.

  13. Progress on the Design of the Storage Ring Vacuum System for the Advanced Photon Source Upgrade Project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Stillwell, B.; Billett, B.; Brajuskovic, B.

    2017-06-20

    Recent work on the design of the storage ring vacuum system for the Advanced Photon Source Upgrade project (APS-U) includes: revising the vacuum system design to accommodate a new lattice with reverse bend magnets, modifying the designs of vacuum chambers in the FODO sections for more intense incident synchrotron radiation power, modifying the design of rf-shielding bellows liners for better performance and reliability, modifying photon absorber designs to make better use of available space, and integrated planning of components needed in the injection, extraction and rf cavity straight sections. An overview of progress in these areas is presented.

  14. It Comes With the Job: Work Organizational, Job Design, and Self-Regulatory Barriers to Improving the Health Status of Train Drivers.

    PubMed

    Naweed, Anjum; Chapman, Janine; Allan, Matthew; Trigg, Joshua

    2017-03-01

    This study aimed to examine the impacts of key barriers to improving the occupational health status of Australian train drivers. From May to June, 2015, five semi-structured qualitative focus groups were conducted with 29 train drivers from South Australian, Victorian, and New South Wales-based rail organizations in Australia. Occupational health was impeded by multiple barriers regarding sleep (patterns/fatigue), diet (planning/context), mental health (occupational stress), rostering (low autonomy), sedentary time, low fitness motivation, and family/social life conflicts. Work organizational barriers included communication issues, low organizational support, and existing social norms. Job design barriers included rostering, fatigue, stimulant reliance, and family/social life imbalances. Self-regulatory barriers included dietary and exercise patterns habits and patterns. Occupational health interventions for Australian train drivers must address work organizational, job design, and self-regulatory barriers to healthier lifestyle behaviors.

  15. Support and Dissemination of Teacher-Authored Lesson Plans: a Digital Library for Earth System Education (DLESE) and Geological Society of America (GSA) Collaboration

    NASA Astrophysics Data System (ADS)

    Devaul, H.; Pandya, R. E.; McLelland, C. V.

    2003-12-01

    The Digital Library for Earth System Education (www.dlese.org) and the Geological Society of America (www.geosociety.org) are working together to publish and disseminate teacher-authored Earth science lesson plans. DLESE is a community-based effort involving teachers, students, and scientists working together to create a library of educational resources and services to support Earth system science education. DLESE offers free access to electronic resources including lesson plans, maps, images, data sets, visualizations, and assessment activities. A number of thematic collections have recently been accessioned, which has substantially increased library holdings. Working in concert with GSA, a non-profit organization dedicated to the advancement of the geosciences, small-scale resource creators such as classroom teachers without access to a web server can also share educational resources of their own design. Following a two-step process, lesson plans are submitted to the GSA website, reviewed and posted to the K-12 resource area: http://www.geosociety.org/educate/resources.htm. These resources are also submitted to the DLESE Community Collection using a simple cataloging tool. In this way resources are available to other teachers via the GSA website as well as via the DLESE collection. GSA provides a template for lesson plan developers which assists in providing the necessary information to help users find and understand the intent of the activity when searching in DLESE. This initial effort can serve as a prototype for important services allowing individual community members to contribute their work to DLESE with little technical overhead.

  16. Applications of instructional design theory to lesson planning for Superfund incident commander training

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Mansfield, N.J.

    1992-01-01

    The increasing number of hazardous materials accidents in the United States has resulted in new federal regulations addressing the emergency response activities associated with chemical releases. A significant part of these new federal standards (29 CFR 1910.120 and 40 CFR Part 311) requires compliance with specific criteria by all personnel involved in a hazardous material emergency. This study investigated alternative lesson design models applicable to instruction for hazardous material emergencies. A specialized design checklist was created based on the work of Gagne, Briggs, and Wager (1988), Merrill (1987), and Clark (1989). This checklist was used in the development of lessonmore » plan templates for the hazardous materials incident commander course. Qualitative data for establishing learning objectives was collected by conducting a needs assessment and a job analysis of the incident commander position. Incident commanders from 14 public and private organizations participated in the needs assessment process. Technical information for the lessons was collected from appropriate governmental agencies. The implementation of the checklist and lesson plans can contribute to assuring quality training for incident commanders throughout the United States.« less

  17. Planning and Design of Water Resources Systems Under Climate Change and Variability

    NASA Astrophysics Data System (ADS)

    Strzepek, K. M.

    2014-12-01

    Regional and local water supplies and demands are impacted by global and national systems: climate, economics, population and energy as well as policies: development, energy, and environmental. These drivers can result in complex interactions that require deeper understanding in order to provide actionable information for water planners and stakeholders to develop strategic plans in the face of a changing and growing world. To add more complexity to this issue is the fact that all these drivers are uncertain and the type of uncertainty is not the same. This talk will address approaches to Water Resource Planning at sub-national water regions, national levels and trans-boundary river basins under a non-stationary hydro-climatic future. Additionally the talk will address the design of specific water resource projects such as reservoirs and hydroplants that are being designed now but will operate far in the future when the hydro-climatology will be very different. Examples will be drawn from recent work in Africa, Eastern Europe and Central Asia, and North America and some insights and outstanding questions will be presented.

  18. Employing Earned Value Management in Government Research and Design - Lessons Learned from the Trenches

    NASA Technical Reports Server (NTRS)

    Simon, Tom

    2009-01-01

    To effectively manage a project, the project manager must have a plan, understand the current conditions, and be able to take action to correct the course when challenges arise. Research and design projects face technical, schedule, and budget challenges that make it difficult to utilize project management tools developed for projects based on previously demonstrated technologies. Projects developing new technologies by their inherent nature are trying something new and thus have little to no data to support estimates for schedule and cost, let alone the technical outcome. Projects with a vision for the outcome but little confidence in the exact tasks to accomplish in order to achieve the vision incur cost and schedule penalties when conceptual solutions require unexpected iterations or even a reinvention of the plan. This presentation will share the project management methodology and tools developed through trial and error for a NASA research and design project combining industry, academia, and NASA inhouse work in which Earned Value Management principles were employed but adapted for the reality of the government financial system and the reality of challenging technology development. The priorities of the presented methodology are flexibility, accountability, and simplicity to give the manager tools to help deliver to the customer while not using up valuable time and resources on extensive planning and analysis. This presentation will share the methodology, tools, and work through failed and successful examples from the three years of process evolution.

  19. Vulnerability-based evaluation of water supply design under climate change

    NASA Astrophysics Data System (ADS)

    Umit Taner, Mehmet; Ray, Patrick; Brown, Casey

    2015-04-01

    Long-lived water supply infrastructures are strategic investments in the developing world, serving the purpose of balancing water deficits compounded by both population growth and socio-economic development. Robust infrastructure design under climate change is compelling, and often addressed by focusing on the outcomes of climate model projections ('scenario-led' planning), or by identifying design options that are less vulnerable to a wide range of plausible futures ('vulnerability-based' planning). Decision-Scaling framework combines these two approaches by first applying a climate stress test on the system to explore vulnerabilities across many traces of the future, and then employing climate projections to inform the decision-making process. In this work, we develop decision scaling's nascent risk management concepts further, directing actions on vulnerabilities identified during the climate stress test. In the process, we present a new way to inform climate vulnerability space using climate projections, and demonstrate the use of multiple decision criteria to guide to a final design recommendation. The concepts are demonstrated for a water supply project in the Mombasa Province of Kenya, planned to provide domestic and irrigation supply. Six storage design capacities (from 40 to 140 million cubic meters) are explored through a stress test, under a large number climate traces representing both natural climate variability and plausible climate changes. Design outcomes are simulated over a 40-year planning period with a coupled hydrologic-water resources systems model and using standard reservoir operation rules. Resulting performance is expressed in terms of water supply reliability and economic efficiency. Ensemble climate projections are used for assigning conditional likelihoods to the climate traces using a statistical distance measure. The final design recommendations are presented and discussed for the decision criteria of expected regret, satisficing, and conditional value-at-risk (CVaR).

  20. National Wind Tunnel Complex (NWTC)

    NASA Technical Reports Server (NTRS)

    1996-01-01

    The National Wind Tunnel Complex (NWTC) Final Report summarizes the work carried out by a unique Government/Industry partnership during the period of June 1994 through May 1996. The objective of this partnership was to plan, design, build and activate 'world class' wind tunnel facilities for the development of future-generation commercial and military aircraft. The basis of this effort was a set of performance goals defined by the National Facilities Study (NFS) Task Group on Aeronautical Research and Development Facilities which established two critical measures of improved wind tunnel performance; namely, higher Reynolds number capability and greater productivity. Initial activities focused upon two high-performance tunnels (low-speed and transonic). This effort was later descoped to a single multipurpose tunnel. Beginning in June 1994, the NWTC Project Office defined specific performance requirements, planned site evaluation activities, performed a series of technical/cost trade studies, and completed preliminary engineering to support a proposed conceptual design. Due to budget uncertainties within the Federal government, the NWTC project office was directed to conduct an orderly closure following the Systems Design Review in March 1996. This report provides a top-level status of the project at that time. Additional details of all work performed have been archived and are available for future reference.

  1. Office type's association to employees' welfare: Three studies.

    PubMed

    Danielsson, Christina Bodin

    2016-08-12

    The workplace is important for employees' daily life and well-being. This article investigates exploratory the office design's role for employees' welfare from different perspectives. By comparing different studies of the office, type's influence on different factors of employees' welfare the aim is to see if any common patterns exist in office design's impact. The three included studies investigate office type's association with employees' welfare by measuring its influence on: a) perception of leadership, b) sick leave, and c) job satisfaction.The sample consists of office employees from a large, national representative work environment survey that work in one of the seven identified office types in contemporary office design: (1) cell-offices; (2) shared-room offices; (3) small, (4) medium-sized and (5) large open-plan offices; (6) flex-offices and (7) combi-offices. Statistical method used is multivariate logistic and linear regression analysis with adjustment for background factors. Overall results show that shared-room office, traditional open plan offices and flex-office stand out negatively, but to different degree(s) on the different outcomes measured. This explorative comparison of different studies finds a pattern of office types that repeatedly show indications of negative influence on employees' welfare, but further studies are needed to clarify this.

  2. 40 CFR 57.602 - Approval of proposal.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... § 57.603. The application shall also specify: (1) The design and substantive elements of the research...) The smelter owner's proposal. The smelter owner's NSO application shall include a proposed NSO... agency is that the planned work must yield the most cost effective technology possible. (c) Optional...

  3. Understanding Our Environment: People.

    ERIC Educational Resources Information Center

    Tweed, Ann

    Part of the Understanding Our Environment project that is designed to engage students in investigating specific environmental problems through concrete activities and direct experience, students work individually and in groups to plan a future community in order to gain an understanding of how greatly increased human populations impact resources,…

  4. PLANNING THE ART ROOM.

    ERIC Educational Resources Information Center

    POPOLIZIO, VINCENT J.; AND OTHERS

    FACILITIES FOR CARRYING OUT AN ART PROGRAM MUST BE DESIGNED TO MEET THE NEEDS OF STUDENTS IN SCHOOL AND THOSE ENROLLED IN ADULT PROGRAMS. PROVISIONS MUST BE INCLUDED FOR PAINTING AND DRAWING, THE GRAPHIC ARTS, GENERAL CRAFTS, MODELING, SCHULPTURING, PHOTOGRAPHY, SERIGRAPHY, AND MECHANICAL DRAWING. WORK CENTERS AND TRAFFIC FLOW NEED CAREFUL…

  5. Living in Space

    NASA Technical Reports Server (NTRS)

    Andrews, Sheila Briskin; Kirschenbaum, Audrey

    1988-01-01

    Operation Liftoff was designed to encourage pupils in the nation's elementary schools to take a greater interest in mathematics and science. Topics addressed include: food, clothing, health, housing, communication, and working. Each unit consists of background information, a teacher printout (lesson plan), and student liftoff (activities) for levels A, B, and C.

  6. Disaster Training: Monroe Community College

    ERIC Educational Resources Information Center

    McConkey, Diane

    2005-01-01

    This article discusses Monroe Community College's CERT (Community Emergency Response Team), a program designed to help neighborhoods and work sites prepare for effective disaster response through training and planning. The program requires 24 hours of theoretical and hands-on practice in self-help and mutual-aid emergency functions. CERT personnel…

  7. College Students with Disabilities and Assistive Technology: A Desk Reference Guide.

    ERIC Educational Resources Information Center

    Thompson, Anne R.; And Others

    This resource guide is designed to provide a quick reference for professionals (employment recruiters and counselors in vocational rehabilitation, disability services, and career services), who work with college students with disabilities, in incorporating assistive technology into planning for postsecondary education and employment. First, types…

  8. 40 CFR 35.2035 - Rotating biological contractor (RBC) replacement grants.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... AND OTHER FEDERAL ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works... a grant for 100 percent of the cost, including planning and design costs, of modification or...) The RBC failure has significantly increased the project's capital or operation and maintenance costs...

  9. 40 CFR 35.2035 - Rotating biological contractor (RBC) replacement grants.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... AND OTHER FEDERAL ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works... a grant for 100 percent of the cost, including planning and design costs, of modification or...) The RBC failure has significantly increased the project's capital or operation and maintenance costs...

  10. Stream On: Video Servers in the Real World.

    ERIC Educational Resources Information Center

    Tristram, Claire

    1995-01-01

    Despite plans for corporate training networks, digital ad-insertion systems, hotel video-on-demand, and interactive television, only small scale video networks presently work. Four case studies examine the design and implementation decisions for different markets: corporate; advertising; hotel; and commercial video via cable, satellite or…

  11. 76 FR 35426 - Denali Commission Fiscal Year 2011 Draft Work Plan

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-17

    ... facilitates a successful leadership development project for young Alaskans. Training Funding Strategy... quickly to targets of opportunity, but they have also had the positive effect of ensuring project design... consistent with the Commission's mission and values in 2006. Sponsorship activities provide a positive venue...

  12. Helping Your Students To Understand Complex Social Problems.

    ERIC Educational Resources Information Center

    Valentine, Tom, Ed.; Sandlin, Jenny, Ed.

    1998-01-01

    This document, which was developed to assist individuals working in publicly sponsored literacy programs in Georgia, offers instructional plans and practical strategies designed to help teachers help students of adult literacy, adult basic education, General Educational Development, and English as a second language understand complex social…

  13. Career Education Programs That Work.

    ERIC Educational Resources Information Center

    Interinstitutional Consortium for Career Education, Salem, OR.

    This handbook contains thirty abstracts of career education programs that summarize techniques, processes, activities, and materials that have been used by students and teachers. The handbook, which was designed for use after the planning stages, includes items for kindergarten through grade twelve that can be related to various subject matter…

  14. V-TECS Guide for Machine Shop (Machinist).

    ERIC Educational Resources Information Center

    Gregory, Margaret R.; Benson, Robert T.

    This curriculum guide is intended to train trade and industrial education students in the hands-on aspects of the occupation of machinist. Included in the guide are course outlines that deal with the following topics: following safety procedures; performing mathematical calculations; designing and planning machine work; performing precision…

  15. 24 CFR 597.201 - Evaluating the strategic plan.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... considers issues of design and amenities that will foster a sustainable community, such as open spaces..., attitude, and initiative to make work rewarding; (7) Education goals. The extent to which schools... initiatives and community based drug abuse education programs; (10) Equal opportunity. The extent to which the...

  16. 24 CFR 597.201 - Evaluating the strategic plan.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... considers issues of design and amenities that will foster a sustainable community, such as open spaces..., attitude, and initiative to make work rewarding; (7) Education goals. The extent to which schools... initiatives and community based drug abuse education programs; (10) Equal opportunity. The extent to which the...

  17. 24 CFR 597.201 - Evaluating the strategic plan.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... considers issues of design and amenities that will foster a sustainable community, such as open spaces..., attitude, and initiative to make work rewarding; (7) Education goals. The extent to which schools... initiatives and community based drug abuse education programs; (10) Equal opportunity. The extent to which the...

  18. 24 CFR 597.201 - Evaluating the strategic plan.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... considers issues of design and amenities that will foster a sustainable community, such as open spaces..., attitude, and initiative to make work rewarding; (7) Education goals. The extent to which schools... initiatives and community based drug abuse education programs; (10) Equal opportunity. The extent to which the...

  19. Collaborative Graduate Education across Multiple Campuses

    ERIC Educational Resources Information Center

    Thompson, J. R.; Hess, G. R.; Bowman, T. A.; Magnusdottir, H.; Stubbs-Gipson, C. E.; Groom, M.; Miller, J. R.; Steelman, T. A.; Stokes, D. L.

    2009-01-01

    Multi-institutional approaches to graduate education continue to emerge as a way to better prepare students for collaborative work. In this article, we describe a graduate course designed to investigate application of conservation biology principles by local land use planners. "Where is Conservation Science in Local Planning?" was…

  20. Man as a Meter.

    ERIC Educational Resources Information Center

    Snoonian, Deborah

    2002-01-01

    Describes the main lecture hall at the University of Michigan's Taubman College of Architecture and Urban Planning, which contains state-of-the-art computing, sound, lighting, and projection systems. This working audiovisual (AV) laboratory allows its designer, professor Mojtaba Navvab, to teach the basics of environmental technology and AV design…

  1. 40 CFR 130.9 - Designation and de-designation.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... QUALITY PLANNING AND MANAGEMENT § 130.9 Designation and de-designation. (a) Designation. Areawide planning... specified in Water Quality Management (WQM) plans. Areawide planning agencies shall monitor DMA activities... continue water quality planning activities within the designated boundaries. (c) Impact of de-designation...

  2. Pretest Predictions for Phase II Ventilation Tests

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Yiming Sun

    The objective of this calculation is to predict the temperatures of the ventilating air, waste package surface, and concrete pipe walls that will be developed during the Phase II ventilation tests involving various test conditions. The results will be used as inputs to validating numerical approach for modeling continuous ventilation, and be used to support the repository subsurface design. The scope of the calculation is to identify the physical mechanisms and parameters related to thermal response in the Phase II ventilation tests, and describe numerical methods that are used to calculate the effects of continuous ventilation. The calculation is limitedmore » to thermal effect only. This engineering work activity is conducted in accordance with the ''Technical Work Plan for: Subsurface Performance Testing for License Application (LA) for Fiscal Year 2001'' (CRWMS M&O 2000d). This technical work plan (TWP) includes an AP-2.21Q, ''Quality Determinations and Planning for Scientific, Engineering, and Regulatory Compliance Activities'', activity evaluation (CRWMS M&O 2000d, Addendum A) that has determined this activity is subject to the YMP quality assurance (QA) program. The calculation is developed in accordance with the AP-3.12Q procedure, ''Calculations''. Additional background information regarding this activity is contained in the ''Development Plan for Ventilation Pretest Predictive Calculation'' (DP) (CRWMS M&O 2000a).« less

  3. Strategic planning futurists need to be capitation-specific and epidemiological.

    PubMed

    Kurtenbach, J; Warmoth, T

    1995-09-01

    Strategic planning has always been a proposition of envisioning an organization's future state, then working backward, quarter by quarter, year by year, to plot a course of action. The surer the vision, the surer the course. In our burgeoning capitated environment, the successful provider will clarify a singular vision: to manage health care for a defined population. The key will be to understand the changing needs of covered lives and to prepare the organization to serve those needs. Gone are the days when mere responsiveness to market needs and preferences could secure a hospital's competitive advantage. Nimble, surefooted, practically clairvoyant--the emerging health care leader will listen to reliable epidemiologic information and custom-design its future. Timing is everything. Depending only your market's readiness for capitation, epidemiologic research and planning techniques may not prove critical to your organization for five to seven years. Good thing, too, because a few years may be just the head start many hospitals and health care systems need. Now is the time to lay the groundwork, to cultivate new planning techniques that will work under capitation, and to jettison any outdated modes of strategic thinking. Assemble all the talent and knowledge you need, then give your best minds ample room to do their work.

  4. Effects of Information Visualization on Older Adults' Decision-Making Performance in a Medicare Plan Selection Task: A Comparative Usability Study.

    PubMed

    Price, Margaux M; Crumley-Branyon, Jessica J; Leidheiser, William R; Pak, Richard

    2016-06-01

    Technology gains have improved tools for evaluating complex tasks by providing environmental supports (ES) that increase ease of use and improve performance outcomes through the use of information visualizations (info-vis). Complex info-vis emphasize the need to understand individual differences in abilities of target users, the key cognitive abilities needed to execute a decision task, and the graphical elements that can serve as the most effective ES. Older adults may be one such target user group that would benefit from increased ES to mitigate specific declines in cognitive abilities. For example, choosing a prescription drug plan is a necessary and complex task that can impact quality of life if the wrong choice is made. The decision to enroll in one plan over another can involve comparing over 15 plans across many categories. Within this context, the large amount of complex information and reduced working memory capacity puts older adults' decision making at a disadvantage. An intentionally designed ES, such as an info-vis that reduces working memory demand, may assist older adults in making the most effective decision among many options. The objective of this study is to examine whether the use of an info-vis can lower working memory demands and positively affect complex decision-making performance of older adults in the context of choosing a Medicare prescription drug plan. Participants performed a computerized decision-making task in the context of finding the best health care plan. Data included quantitative decision-making performance indicators and surveys examining previous history with purchasing insurance. Participants used a colored info-vis ES or a table (no ES) to perform the decision task. Task difficulty was manipulated by increasing the number of selection criteria used to make an accurate decision. A repeated measures analysis was performed to examine differences between the two table designs. Twenty-three older adults between the ages of 66 and 80 completed the study. There was a main effect for accuracy such that older adults made more accurate decisions in the color info-vis condition than the table condition. In the low difficulty condition, participants were more successful at choosing the correct answer when the question was about the gap coverage attribute in the info-vis condition. Participants also made significantly faster decisions in the info-vis condition than in the table condition. Reducing the working memory demand of the task through the use of an ES can improve decision accuracy, especially when selection criteria is only focused on a single attribute of the insurance plan.

  5. Guidelines for designing a digestive disease endoscopy unit: report of the World Endoscopy Organization.

    PubMed

    Mulder, Chris J J; Jacobs, Maarten A J M; Leicester, Roger J; Nageshwar Reddy, D; Shepherd, Libby E A; Axon, Anthony T; Waye, Jerome D

    2013-07-01

    A dedicated digestive disease endoscopy unit is structurally and functionally differentiating rapidly as a result of increasing diagnostic and therapeutic possibilities in the last 10-20 years. Publications with practical details are scarce, imposing a challenge in the construction of such a unit. The lack of authoritative information about endoscopy unit design means that architects produce their own design with or without consulting endoscopists working in such a unit. A working group of the World Endoscopy Organization discussed and outlined a practical approach fordesign and construction of a modern endoscopy unit. Designing the layout is extremely important, necessitating thoughtful planning to provide comfort to the endoscopy staff and patients, and efficient data archiving and transmission during endoscopic services. © 2013 The Authors. Digestive Endoscopy © 2013 Japan Gastroenterological Endoscopy Society.

  6. The MANIFEST prototyping design study

    NASA Astrophysics Data System (ADS)

    Lawrence, Jonathan S.; Ben-Ami, Sagi; Brown, David M.; Brown, Rebecca A.; Case, Scott; Chapman, Steve; Churilov, Vladimir; Colless, Matthew; Content, Robert; Depoy, Darren; Evans, Ian; Farrell, Tony; Goodwin, Michael; Jacoby, George; Klauser, Urs; Kuehn, Kyler; Lorente, Nuria P. F.; Mali, Slavko; Marshall, Jennifer; Muller, Rolf; Nichani, Vijay; Pai, Naveen; Prochaska, Travis; Saunders, Will; Schmidt, Luke; Shortridge, Keith; Staszak, Nicholas F.; Szentgyorgyi, Andrew; Tims, Julia; Vuong, Minh V.; Waller, Lewis G.; Zhelem, Ross

    2016-08-01

    MANIFEST is a facility multi-object fibre system for the Giant Magellan Telescope, which uses `Starbug' fibre positioning robots. MANIFEST, when coupled to the telescope's planned seeing-limited instruments, GMACS, and G-CLEF, offers access to: larger fields of view; higher multiplex gains; versatile reformatting of the focal plane via IFUs; image-slicers; and in some cases higher spatial and spectral resolution. The Prototyping Design Study phase for MANIFEST, nearing completion, has focused on developing a working prototype of a Starbugs system, called TAIPAN, for the UK Schmidt Telescope, which will conduct a stellar and galaxy survey of the Southern sky. The Prototyping Design Study has also included work on the GMT instrument interfaces. In this paper, we outline the instrument design features of TAIPAN, highlight the modifications that will be necessary for the MANIFEST implementation, and provide an update on the MANIFEST/instrument interfaces.

  7. A census study exploring the training needs of nurses working in Kwong Wah Hospital and Wong Tai Sin Hospital in Hong Kong, China.

    PubMed

    Lai, Yuk-Wah

    2013-01-01

    As part of the strategic professional development plan for nurses, training needs analysis was conducted from August 2011 to February 2012, in the form of descriptive research with survey design. The aim was to support nursing staff in their professional development needs and promote staff engagement. Consecutive sampling was employed; all full time nurses working in Kwong Wah Hospital (KWH) and Wong Tai Sin Hospital (WTSH) were recruited and invited to complete a self-administered questionnaire. Based on the findings and conclusions, follow up strategies were proposed. Management then built a sustainable learning environment for KWH and WTSH nurses in the 2012-2015 professional development plan.

  8. UAS Integration into the NAS: Detect and Avoid Display Evaluations in Support of SC-228 MOPS Development

    NASA Technical Reports Server (NTRS)

    Fern, Lisa; Rorie, Conrad; Shively, Jay

    2016-01-01

    At the May 2015 SC-228 meeting, requirements for TCAS II interoperability became elevated in priority. A TCAS interoperability work group was formed to identify and address key issuesquestions. The TCAS work group came up with an initial list of questions and a plan to address those questions. As part of that plan, NASA proposed to run a mini HITL to address display, alerting and guidance issues. A TCAS Interoperability Workshop was held to determine potential displayalertingguidance issues that could be explored in future NASA mini HITLS. Consensus on main functionality of DAA guidance when TCAS II RA occurs. Prioritized list of independent variables for experimental design. Set of use cases to stress TCAS Interoperability.

  9. Violence prevention at work. A business perspective.

    PubMed

    Wilkinson, C W

    2001-02-01

    The risk of workplace violence varies depending on the type and location of the business. Business managers should assess violence risk and develop a program based on the level of risk faced by their employees. This assessment should include: (1) a review of workplace security and identification of positions with increased risk of exposure to violence, (2) risk reduction through environmental design and employee training, (3) development of a plan and identification of professional resources to respond to incidents should they occur, and (4) communication of the employer's commitment to providing a safe work environment for employees. For most businesses, threat assessment and management comprise the cornerstone of a workplace violence-prevention program. Planning and preparation are key to workplace violence prevention.

  10. Using simulation to design a central sterilization department.

    PubMed

    Lin, Feng; Lawley, Mark; Spry, Charlie; McCarthy, Kelly; Coyle-Rogers, Patricia G; Yih, Yuehwern

    2008-10-01

    A simulation project was performed to assist with redesign of the surgery department of a large tertiary hospital and to help administrators make the best decisions about relocating, staffing, and equipping the central sterilization department. A simulation model was created to analyze department configurations, staff schedules, equipment capacities, and cart-washing requirements. Performance measures examined include tray turnaround time, surgery-delay rate, and work-in-process levels. The analysis provides significant insight into how the proposed system will perform, allowing planning for expected patient volume increases. This work illustrates how simulation can facilitate the design of a central sterilization department and improve surgical sterilization operations.

  11. WORKING PARK-FUEL CELL COMBINED HEAT AND POWER SYSTEM

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Allan Jones

    2003-09-01

    This report covers the aims and objectives of the project which was to design, install and operate a fuel cell combined heat and power (CHP) system in Woking Park, the first fuel cell CHP system in the United Kingdom. The report also covers the benefits that were expected to accrue from the work in an understanding of the full technology procurement process (including planning, design, installation, operation and maintenance), the economic and environmental performance in comparison with both conventional UK fuel supply and conventional CHP and the commercial viability of fuel cell CHP energy supply in the new deregulated energymore » markets.« less

  12. Workflow Agents vs. Expert Systems: Problem Solving Methods in Work Systems Design

    NASA Technical Reports Server (NTRS)

    Clancey, William J.; Sierhuis, Maarten; Seah, Chin

    2009-01-01

    During the 1980s, a community of artificial intelligence researchers became interested in formalizing problem solving methods as part of an effort called "second generation expert systems" (2nd GES). How do the motivations and results of this research relate to building tools for the workplace today? We provide an historical review of how the theory of expertise has developed, a progress report on a tool for designing and implementing model-based automation (Brahms), and a concrete example how we apply 2nd GES concepts today in an agent-based system for space flight operations (OCAMS). Brahms incorporates an ontology for modeling work practices, what people are doing in the course of a day, characterized as "activities." OCAMS was developed using a simulation-to-implementation methodology, in which a prototype tool was embedded in a simulation of future work practices. OCAMS uses model-based methods to interactively plan its actions and keep track of the work to be done. The problem solving methods of practice are interactive, employing reasoning for and through action in the real world. Analogously, it is as if a medical expert system were charged not just with interpreting culture results, but actually interacting with a patient. Our perspective shifts from building a "problem solving" (expert) system to building an actor in the world. The reusable components in work system designs include entire "problem solvers" (e.g., a planning subsystem), interoperability frameworks, and workflow agents that use and revise models dynamically in a network of people and tools. Consequently, the research focus shifts so "problem solving methods" include ways of knowing that models do not fit the world, and ways of interacting with other agents and people to gain or verify information and (ultimately) adapt rules and procedures to resolve problematic situations.

  13. Build On-the-Job Success Skills. Breakthrough Strategies To Teach and Counsel Troubled Youth: Social Skills, School Skills, Coping Skills Lesson Series.

    ERIC Educational Resources Information Center

    Wells, Ruth Herman

    This document is one of eight in a series of guides designed to help teach and counsel troubled youth. This document focuses on the social skills necessary for on-the-job success. It includes 20 lesson plans that help students learn appropriate behaviors at the work place. The first lesson instructs students on what to wear and bring to work.…

  14. Human Factors Engineering. A Self-Paced Text, Lessons 36-40,

    DTIC Science & Technology

    1981-08-01

    proposed contract does not involve ’significant human interface for operation/ maintenance /control,’ the selection guide should not be used. Turn to Page 98... work space configuration, packaging, and labeling. These are all aspects of maintenance which need to be incorporated into the original design plans... work done. An ROC is a ’Required Operational Capability’ statement that is required by the Army during the system acquisition process . Return to Page

  15. Manned remote work station development article. Volume 3: Development test plan. Appendix A: Manufacturing requirements/schedule

    NASA Technical Reports Server (NTRS)

    1979-01-01

    The tests and procedures for the manned remote work station (MRWS) open cherry picker (OCP) development test article (DTA) are described to validate systems requirements and performance specifications. A development test program is outlined to evaluate key design issues and man/machine interfaces when the MRWS OCP is used in a shuttle support role of satellite servicing and in orbit construction of large structures.

  16. The Ohio Cross-Cultural Tobacco Control Alliance: Understanding and Eliminating Tobacco-Related Disparities Through the Integration of Science, Practice, and Policy

    PubMed Central

    Adhikari, Surendra B.; Clopton, Tracy M.; Oches, Barry; Jensen, Conrado

    2010-01-01

    Objectives. We examined the development of a process designed to eliminate tobacco-related disparities in the state of Ohio and described how a cross-cultural work group used a multicomponent community planning process to develop capacity to address such disparities. Methods. The community development model was used as a guide in the planning process. We employed a case study, focus groups, and telephone interviews to assess the process and collect data on tobacco use and awareness. We also employed the appreciative inquiry framework to create the organizational design for the Ohio Cross-Cultural Tobacco Control Alliance (CCTCA), which was formed from the cross-cultural work group and charged with addressing tobacco-related disparities in the state. Results. Data on tobacco use and awareness were collected from 13 underserved populations. At the end of the planning process, the CCTCA was initiated along with structural capacity to serve as a new program incubator highlighting tobacco use and awareness levels in these populations. Conclusions. The CCTCA appeared to be an effective way to begin mobilizing agencies serving underserved populations by providing an operational structure to address tobacco-related disparities. The alliance also successfully implemented culturally competent community-based programs and policies to help eliminate disparities. PMID:20147668

  17. Image formation simulation for computer-aided inspection planning of machine vision systems

    NASA Astrophysics Data System (ADS)

    Irgenfried, Stephan; Bergmann, Stephan; Mohammadikaji, Mahsa; Beyerer, Jürgen; Dachsbacher, Carsten; Wörn, Heinz

    2017-06-01

    In this work, a simulation toolset for Computer Aided Inspection Planning (CAIP) of systems for automated optical inspection (AOI) is presented along with a versatile two-robot-setup for verification of simulation and system planning results. The toolset helps to narrow down the large design space of optical inspection systems in interaction with a system expert. The image formation taking place in optical inspection systems is simulated using GPU-based real time graphics and high quality off-line-rendering. The simulation pipeline allows a stepwise optimization of the system, from fast evaluation of surface patch visibility based on real time graphics up to evaluation of image processing results based on off-line global illumination calculation. A focus of this work is on the dependency of simulation quality on measuring, modeling and parameterizing the optical surface properties of the object to be inspected. The applicability to real world problems is demonstrated by taking the example of planning a 3D laser scanner application. Qualitative and quantitative comparison results of synthetic and real images are presented.

  18. Coupling Adaptation Tipping Points and Engineering Options: New Insights for Resilient Water Infrastructure Replacement Planning

    NASA Astrophysics Data System (ADS)

    Smet, K.; de Neufville, R.; van der Vlist, M.

    2017-12-01

    This work presents an innovative approach for replacement planning for aging water infrastructure given uncertain future conditions. We draw upon two existing methodologies to develop an integrated long-term replacement planning framework. We first expand the concept of Adaptation Tipping Points to generate long-term planning timelines that incorporate drivers of investment related to both internal structural processes as well as changes in external operating conditions. Then, we use Engineering Options to explore different actions taken at key moments in this timeline. Contrasting to the traditionally more static approach to infrastructure design, designing the next generation of infrastructure so it can be changed incrementally is a promising method to safeguard current investments given future uncertainty. This up-front inclusion of structural options in the system actively facilitates future adaptation, transforming uncertainty management in infrastructure planning from reactive to more proactive. A two-part model underpins this approach. A simulation model generates diverse future conditions, allowing development of timelines of intervention moments in the structure's life. This feeds into an economic model, evaluating the lifetime performance of different replacement strategies, making explicit the value of different designs and their flexibility. A proof of concept study demonstrates this approach for a pumping station. The strategic planning timelines for this structure demonstrate that moments when capital interventions become necessary due to reduced functionality from structural degradation or changed operating conditions are widely spread over the structure's life. The disparate timing of these necessary interventions supports an incremental, adaptive mindset when considering end-of-life and replacement decisions. The analysis then explores different replacement decisions, varying the size and specific options included in the proposed new structure. Results show that incremental adaptive designs and incorporating options can improve economic performance, as compared to traditional, "build it once & build it big" designs. The benefit from incorporating flexibility varies with structural functionality, future conditions and the specific options examined.

  19. Challenges for Planning and Maintaining of Urban Rain Harvesting Systems- the case of Hammarby Sjöstad and Årstafältet in Stockholm

    NASA Astrophysics Data System (ADS)

    Suleiman, Lina

    2017-04-01

    Planners and policymakers' concern escalates over conventional systems dealing with rains in cities based on domination and control of nature rather than harmony and design with nature. A new spatial planning paradigm is needed to put in place systems which mimic natural water systems and promise multiple values instead of systems consider rain as a source of problem. However, such approach embodies significant planning challenges. Urban rain harvesting systems (URHs) are inherently viewed as 'sociotechnical' systems. As such, planning processes should consider the interdependence of 'social' and 'technical' aspects as essential elements if a transition towards sustainable urban water systems is to be realised. Drawing on a common understanding for what urban rain harvesting systems should deliver in terms of 'functions' and 'added values', a generic planning framework is developed to inform practitioners on how the 'socio' and 'technical' elements should be assimilated in a long-term and integrated planning processes of URHs. Using the developed framework, the paper examines the planning and maintenance processes of urban rain harvesting systems in Årstafältet and Hammarby Sjöstad respectively. Results show that planners lack a common operational understanding on how these systems should be designed holistically in a long term and integrated planning processes creating working gabs or positional conflicts. In practice, urban planners and water engineers look at these systems as either urban design component or water drainage system to deal with technical functions hindering a smooth transition path towards urban rain harvesting systems. The paper concludes on the urgency for reordering roles and relations within a new set-up organisation to incubate these systems in long-term planning and maintenance processes. Key words: 'Sociotechnical' system, Water, Planning, Urban Rain Harvesting systems (URHs), Hammarby Sjostad and Årstafältet

  20. National NIF Diagnostic Program Fiscal Year 2002 Second Quarter Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    MacGowan, B

    Since October 2001 the development of the facility diagnostics for NIF has been funded by the NIF Director through the National NIF Diagnostic Program (NNDP). The current emphasis of the NNDP is on diagnostics for the early NIF quad scheduled to be available for experiment commissioning in FY03. During the past six months the NNDP has set in place processes for funding diagnostics, developing requirements for diagnostics, design reviews and monthly status reporting. Those processes are described in an interim management plan for diagnostics (''National NIF Diagnostic Program Interim Plan'', NIF-0081315, April 2002) and a draft Program Execution Plan (''Programmore » Execution Plan for the National NlF Diagnostic Program'', NIF-0072083, October 2001) and documents cited therein. Work has been funded at Lawrence Livermore National Laboratory (LLNL), Los Alamos National Laboratory (LANL), Naval Research Laboratory (NRL), Sandia National Laboratories (SNL), Bechtel Nevada at Los Alamos and Santa Barbara. There are no major technical risks with the early diagnostics. The main concerns relate to integration of the diagnostics into the facility, all such issues are being worked. This report is organized to show the schedule and budget status and a summary of Change Control Board actions for the past six months. The following sections then provide short descriptions of the status of each diagnostic. Where design reviews or requirements documents are cited, the documents are available on the Diagnostics file server or on request.« less

  1. Computational health economics for identification of unprofitable health care enrollees

    PubMed Central

    Rose, Sherri; Bergquist, Savannah L.; Layton, Timothy J.

    2017-01-01

    SUMMARY Health insurers may attempt to design their health plans to attract profitable enrollees while deterring unprofitable ones. Such insurers would not be delivering socially efficient levels of care by providing health plans that maximize societal benefit, but rather intentionally distorting plan benefits to avoid high-cost enrollees, potentially to the detriment of health and efficiency. In this work, we focus on a specific component of health plan design at risk for health insurer distortion in the Health Insurance Marketplaces: the prescription drug formulary. We introduce an ensembled machine learning function to determine whether drug utilization variables are predictive of a new measure of enrollee unprofitability we derive, and thus vulnerable to distortions by insurers. Our implementation also contains a unique application-specific variable selection tool. This study demonstrates that super learning is effective in extracting the relevant signal for this prediction problem, and that a small number of drug variables can be used to identify unprofitable enrollees. The results are both encouraging and concerning. While risk adjustment appears to have been reasonably successful at weakening the relationship between therapeutic-class-specific drug utilization and unprofitability, some classes remain predictive of insurer losses. The vulnerable enrollees whose prescription drug regimens include drugs in these classes may need special protection from regulators in health insurance market design. PMID:28369273

  2. Behavioral economics perspectives on public sector pension plans.

    PubMed

    Beshears, John; Choi, James J; Laibson, David; Madrian, Brigitte C

    2011-04-01

    We describe the pension plan features of the states and the largest cities and counties in the U.S. Unlike in the private sector, defined benefit (DB) pensions are still the norm in the public sector. However, a few jurisdictions have shifted toward defined contribution (DC) plans as their primary savings plan, and fiscal pressures are likely to generate more movement in this direction. Holding fixed a public employee's work and salary history, we show that DB retirement income replacement ratios vary greatly across jurisdictions. This creates large variation in workers' need to save for retirement in other accounts. There is also substantial heterogeneity across jurisdictions in the savings generated in primary DC plans because of differences in the level of mandatory employer and employee contributions. One notable difference between public and private sector DC plans is that public sector primary DC plans are characterized by required employee or employer contributions (or both), whereas private sector plans largely feature voluntary employee contributions that are supplemented by an employer match. We conclude by applying lessons from savings behavior in private sector savings plans to the design of public sector plans.

  3. SAFETY ON UNTRUSTED NETWORK DEVICES (SOUND)

    DTIC Science & Technology

    2017-10-10

    in the Cyber & Communication Technologies Group , but not on the SOUND project, would review the code, design and perform attacks against a live...3.5 Red Team As part of our testing , we planned to conduct Red Team assessments. In these assessments, a group of engineers from BAE who worked...developed under the DARPA CRASH program and SOUND were designed to be companion projects. SAFE focused on the processor and the host, SOUND focused on

  4. Chapter 9: 30 Years of Living in a Solar House in Colorado

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Emery, Keith A; Emery, Pat

    2016-12-03

    Having met in 1980 while working at the National Renewable Energy Laboratory, we were inspired by the vision of a renewable energy future to raise our family in a passive solar home. A basic, factory-cut, trilevel house design was selected in 1985 and intentionally sited and modified according to passive solar design principles to optimize conservation and solar gain, with a plan to add photovoltaics as soon as feasible.

  5. Erosion Control and Environment Restoration Plan Development, Matagorda County, Texas. Phase 2. Preliminary Design

    DTIC Science & Technology

    2013-08-01

    recommended groin system. ......................... 37  Figure 23. H1% and Hs at the groin toe as a function of storm surge...phases of work. Keep in mind, the recommended groin system design will advance the shoreline; however, without dune and vegetation management, it...will not create a wider dry beach. Since the existing beach is presumably in equili- brium, the dune and vegetation will advance with the shoreline

  6. Rehabilitation R and D Progress Reports, 1991

    DTIC Science & Technology

    1991-01-01

    FES) is a challeng- work of our group , we are addressing the problem ing problem. A crucial difficulty is controlling the of designing a functional FES... control data. Background infor- research to design and evaluate interventions which mation will be obtained on the visual, sensory, help to reduce the...the senior was randomly Larger scale research is planned to investigate assigned to either a control or service group . the incidence of minor accidents

  7. The subscale orbital fluid transfer experiment

    NASA Technical Reports Server (NTRS)

    Collins, Frank G.; Antar, Basil N.; Menzel, Reinhard W.; Meserole, Jere S.; Meserole, Jere S.; Jones, Ogden

    1990-01-01

    The Subscale Orbital Fluid Transfer Experiment (SOFTE) is a planned Shuttle Orbiter fluid transfer experiment. CASP (Center for Advanced Space Propulsion) performed certain aspects of the conceptual design of this experiment. The CASP work consisted of the conceptual design of the optical system, the search for alternative experimental fluids, the determination of the flow meter specifications and the examination of materials to use for a bladder that will empty one of the tanks in the experiment.

  8. Development and Testing of Geo-Processing Models for the Automatic Generation of Remediation Plan and Navigation Data to Use in Industrial Disaster Remediation

    NASA Astrophysics Data System (ADS)

    Lucas, G.; Lénárt, C.; Solymosi, J.

    2015-08-01

    This paper introduces research done on the automatic preparation of remediation plans and navigation data for the precise guidance of heavy machinery in clean-up work after an industrial disaster. The input test data consists of a pollution extent shapefile derived from the processing of hyperspectral aerial survey data from the Kolontár red mud disaster. Three algorithms were developed and the respective scripts were written in Python. The first model aims at drawing a parcel clean-up plan. The model tests four different parcel orientations (0, 90, 45 and 135 degree) and keeps the plan where clean-up parcels are less numerous considering it is an optimal spatial configuration. The second model drifts the clean-up parcel of a work plan both vertically and horizontally following a grid pattern with sampling distance of a fifth of a parcel width and keep the most optimal drifted version; here also with the belief to reduce the final number of parcel features. The last model aims at drawing a navigation line in the middle of each clean-up parcel. The models work efficiently and achieve automatic optimized plan generation (parcels and navigation lines). Applying the first model we demonstrated that depending on the size and geometry of the features of the contaminated area layer, the number of clean-up parcels generated by the model varies in a range of 4% to 38% from plan to plan. Such a significant variation with the resulting feature numbers shows that the optimal orientation identification can result in saving work, time and money in remediation. The various tests demonstrated that the model gains efficiency when 1/ the individual features of contaminated area present a significant orientation with their geometry (features are long), 2/ the size of pollution extent features becomes closer to the size of the parcels (scale effect). The second model shows only 1% difference with the variation of feature number; so this last is less interesting for planning optimization applications. Last model rather simply fulfils the task it was designed for by drawing navigation lines.

  9. 77 FR 10760 - Request for Information (RFI): Input Into the Deliberations of the Council of Councils Working...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-23

    ... antibody therapies, research on comparative genomics, and non-invasive studies of social and behavioral...: Criteria to assess ``minimally invasive'' procedures for comparative genomics and behavioral research and... of federally-owned chimpanzees and input on the design of the plan; Circumstances under which...

  10. Crowdsourcing as a Novel Approach to Mapping Ecosystem Services in a Great Lakes Area of Concern

    EPA Science Inventory

    A successful crowdsourcing application depends on two dimensions – the theory and experimental design that guides data collection and the application of the technology to execute the plan. The USEPA Mid-Continent Ecology Division is working on the creation and implementatio...

  11. 30 CFR 77.1000 - Highwalls, pits and spoil banks; plans.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... Section 77.1000 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR COAL MINE SAFETY AND HEALTH MANDATORY SAFETY STANDARDS, SURFACE COAL MINES AND SURFACE WORK AREAS OF UNDERGROUND... developed after June 30, 1971, which shall be consistent with prudent engineering design and will insure...

  12. 30 CFR 77.1000 - Highwalls, pits and spoil banks; plans.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... Section 77.1000 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR COAL MINE SAFETY AND HEALTH MANDATORY SAFETY STANDARDS, SURFACE COAL MINES AND SURFACE WORK AREAS OF UNDERGROUND... developed after June 30, 1971, which shall be consistent with prudent engineering design and will insure...

  13. 30 CFR 77.1000 - Highwalls, pits and spoil banks; plans.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Section 77.1000 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR COAL MINE SAFETY AND HEALTH MANDATORY SAFETY STANDARDS, SURFACE COAL MINES AND SURFACE WORK AREAS OF UNDERGROUND... developed after June 30, 1971, which shall be consistent with prudent engineering design and will insure...

  14. 30 CFR 77.1000 - Highwalls, pits and spoil banks; plans.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Section 77.1000 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR COAL MINE SAFETY AND HEALTH MANDATORY SAFETY STANDARDS, SURFACE COAL MINES AND SURFACE WORK AREAS OF UNDERGROUND... developed after June 30, 1971, which shall be consistent with prudent engineering design and will insure...

  15. Is Strategic Development of Leadership Capacity for the Higher Education Workplace Possible?

    ERIC Educational Resources Information Center

    Brown, Majorie Angel

    2012-01-01

    Beginning graduate students who are working in higher education can benefit from establishing a professional development plan designed to enhance leadership capacity. The challenge is to align personal goals with those of the graduate program, yet ensure that collegial socialization and professional competency development occurs. Professional…

  16. 7 CFR 1710.206 - Approval requirements for load forecasts prepared pursuant to approved load forecast work plans.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... effects on electric revenues caused by competition from alternative energy sources or other electric... uncertainty or alternative futures that may determine the borrower's actual loads. Examples of economic... basis. Include alternative futures, as applicable. This summary shall be designed to accommodate the...

  17. 7 CFR 1710.206 - Approval requirements for load forecasts prepared pursuant to approved load forecast work plans.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... effects on electric revenues caused by competition from alternative energy sources or other electric... uncertainty or alternative futures that may determine the borrower's actual loads. Examples of economic... basis. Include alternative futures, as applicable. This summary shall be designed to accommodate the...

  18. 7 CFR 1710.206 - Approval requirements for load forecasts prepared pursuant to approved load forecast work plans.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... effects on electric revenues caused by competition from alternative energy sources or other electric... uncertainty or alternative futures that may determine the borrower's actual loads. Examples of economic... basis. Include alternative futures, as applicable. This summary shall be designed to accommodate the...

  19. 7 CFR 1710.206 - Approval requirements for load forecasts prepared pursuant to approved load forecast work plans.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... effects on electric revenues caused by competition from alternative energy sources or other electric... uncertainty or alternative futures that may determine the borrower's actual loads. Examples of economic... basis. Include alternative futures, as applicable. This summary shall be designed to accommodate the...

  20. Guidelines for Federal Aviation Administration Regional Aviation Education Coordinators and Aviation Education Facilitators.

    ERIC Educational Resources Information Center

    Strickler, Mervin K., Jr.

    This publication is designed to provide both policy guidance and examples of how to work with various constituencies in planning and carrying out appropriate Federal Aviation Administration (FAA) aviation education activities. Information is provided on the history of aerospace/aviation education, FAA educational materials, aerospace/aviation…

  1. Threads of Mission Success

    NASA Technical Reports Server (NTRS)

    Gavin, Thomas R.

    2006-01-01

    This viewgraph presentation reviews the many parts of the JPL mission planning process that the project manager has to work with. Some of them are: NASA & JPL's institutional requirements, the mission systems design requirements, the science interactions, the technical interactions, financial requirements, verification and validation, safety and mission assurance, and independent assessment, review and reporting.

  2. First-Grade Engineers

    ERIC Educational Resources Information Center

    Bautista, Nazan Uludag; Peters, Kari Nichole

    2010-01-01

    Can students build a house that is cost effective and strong enough to survive strong winds, heavy rains, and earthquakes? First graders in Ms. Peter's classroom worked like engineers to answer this question. They participated in a design challenge that required them to plan like engineers and build strong and cost-effective houses that would fit…

  3. Micro-Cycle Teaching Experiments as a Vehicle for Professional Development

    ERIC Educational Resources Information Center

    Billings, Esther M. H.; Kasmer, Lisa

    2015-01-01

    This study used design experiments, specifically micro-cycle teaching experiments (MTE) as a catalyst for practice-based professional development. The MTE incorporated research-based characteristics of effective professional development: it was embedded in the teachers' daily work of planning and enacting lessons, co-constructed with the…

  4. Jobs for Indiana's Future. Executive Report.

    ERIC Educational Resources Information Center

    Jobs for the Future, Inc., West Somerville, MA.

    This report summarizes the work of the Jobs for Indiana's Future (JIF) program, designed to provide the Indiana Commission on Vocational and Technical Education (ICVTE) with assistance in planning for the future by enhancing ICVTE's capacity to guide Indiana's human capital investment strategy. The JIF program undertook an extensive analysis of…

  5. Organinzing the Curriculum Storage in a Preschool/Child Care Environment.

    ERIC Educational Resources Information Center

    Cutler, Kay M.

    2000-01-01

    A preschool staff project was undertaken to develop and implement a more efficient curriculum organization plan and curriculum rotation system. The aim of the project was to provide a healthier working environment by improving communication among the teaching team, organizing curriculum storage outside the classroom, designing curriculum rotation…

  6. School, Work and Family Planning. Interim Impacts in Project Redirection.

    ERIC Educational Resources Information Center

    Polit, Denise F.; And Others

    Project Redirection was designed to help pregnant and parenting adolescents progress toward eventual self-sufficiency by linking them with community agencies and volunteers at four geographically and ethnically diverse sites in the United States. Distinctive features of the program include: (1) a broad scope of services including employability…

  7. Women and Population Growth: Choice beyond Childbearing. Worldwatch Paper 16.

    ERIC Educational Resources Information Center

    Newland, Kathleen

    The paper explores the relationship of women's childbearing attitudes to educational and work opportunities. Program administrators for family planning, educational programs, and national development efforts in developing countries must realize the importance of the social and cultural environment in designing programs to reduce population growth.…

  8. Managing Your Reading Program--A Total System.

    ERIC Educational Resources Information Center

    Hales, Carma M.; Jones, Maurine E.

    This guide provides specific information on designing and implementing a reading program. The guide is divided into the following six parts: (1) "Planning for Instruction," including sections on setting ideal goals, establishing a "reality base," and organizing a work flow; (2) "Content Organization," including sections on the structure of…

  9. 77 FR 67635 - Fiscal Year 2013 Draft Work Plan

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-13

    ... principles: In FY 2013 no project specific direction was provided by Congress. The Energy and Water... FY2013. All Energy and Water Appropriation funds, including operating funds, designated as ``up to'' may...., Energy and Water Appropriation, USDA-RUS, etc.). The grand total for all appropriations appears at the...

  10. Making Health Communication Programs Work. A Planner's Guide.

    ERIC Educational Resources Information Center

    Arkin, Elaine Bratic

    This manual, designed to assist professionals in health and health-related agencies, offers guidance for planning a health communication program about cancer based on social marketing and other principles as well as the experiences of National Cancer Institute staff and other practitioners. The six chapters are arranged by sequentially ordered…

  11. Introduction to Media.

    ERIC Educational Resources Information Center

    Riler, Robert

    Designed for senior high school students, this one semester course focuses on four aspects of modern media: television, film, radio, and advertising. Each topic is worked into a weekly lesson plan format that stresses the active involvement of students in the learning process. The course outline contains lists of objectives and media materials…

  12. How Data Use for Accountability Undermines Equitable Science Education

    ERIC Educational Resources Information Center

    Braaten, Melissa; Bradford, Chris; Kirchgasler, Kathryn L.; Barocas, Sadie Fox

    2017-01-01

    Purpose: When school leaders advance strategic plans focused on improving educational equity through data-driven decision making, how do policies-as-practiced unfold in the daily work of science teachers? The paper aims to discuss this issue. Design/methodology/approach: This ethnographic study examines how data-centric accountability and…

  13. A Power Analysis and Recommended Study Design to Directly Detect Population Level Consequences of Acoustic Disturbance

    DTIC Science & Technology

    2015-09-30

    Detect Population-Level Consequences of Acoustic Disturbance Jeffrey Moore NOAA Southwest Fisheries Science Center 8901 La Jolla Shores Drive...inferences about the population. WORK COMPLETED Investigators met for an all-day planning meeting (Aug 28, 2015) at Southwest Fisheries Science

  14. Issues of planning trajectory of parallel robots taking into account zones of singularity

    NASA Astrophysics Data System (ADS)

    Rybak, L. A.; Khalapyan, S. Y.; Gaponenko, E. V.

    2018-03-01

    A method for determining the design characteristics of a parallel robot necessary to provide specified parameters of its working space that satisfy the controllability requirement is developed. The experimental verification of the proposed method was carried out using an approximate planar 3-RPR mechanism.

  15. Advising. CAP Job Function.

    ERIC Educational Resources Information Center

    Ohio State Univ., Columbus. National Center for Research in Vocational Education.

    This Job Function Book (Advising) is one of the 14 components (see note) of the Career Alert Planning (CAP) program, a set of individualized materials designed to help participants find out about themselves and about the kind of work for which they are suited. In this program, participants become acquainted with occupations that are representative…

  16. New Whole-House Solutions Case Study: Tommy Williams Homes Initial Performance of Two Zero Energy Homes, Gainesville, Florida

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    none,

    2011-11-01

    Tommy Williams Homes worked with PNNL, Florida HERO, Energy Smart Home Plans, and Florida Solar Energy Center to design and test two zero energy homes. Energy use was 30% lower in one home and 60% lower in the other.

  17. Food Service: How and What to Plan.

    ERIC Educational Resources Information Center

    Buchanan, Robert D.

    1962-01-01

    The effectiveness of food service facilities will be greatly enhanced by--(1) developing operating policies early in the design stage, (2) translating menus and recipes into space, time, amounts, and equipment, (3) arranging kitchen functions and work centers into straight line flow, and (4) evaluation. Operating policies and procedures must be…

  18. Experiential Learning through Integrated Project Work: An Example from Soil Science.

    ERIC Educational Resources Information Center

    Mellor, Antony

    1991-01-01

    Describes the planning, implementation, and evaluation of an integrated student soil science project. Reports that the course was designed to develop student-centered approaches to learning and to develop transferable skills and personal qualities at the same time. Explains that the project included fieldwork, laboratory analysis, data…

  19. [Healthy design for sustainable communities].

    PubMed

    Capolongo, S; Battistella, A; Buffoli, M; Oppio, A

    2011-01-01

    Health, quality of life and sustainable development are strongly interconnected. The quality of living is a complex concept that includes different meanings. The quality of life issue has been studied for a long time, even if its measurement is a more recent matter. It's possible to distinguish two main approaches: the first one, depending on which the quality of life corresponds to the social wellbeing and it can be measured objectively; the second one, that emphasizes the perceptive dimension of quality of life, such as needs, feelings and aspirations. According to the WHO's wide definition of wellbeing, this paper suggests an approach focused on the effects that urban planning and designing can have on the health of citizens. Actually many of the problems of the cities like pollution, inequity, lack of services and accessibility depends on decisions about the development of land and buildings. To have more attractive cities in the future it is important that professionals involved in planning and local authorities focus on the major determinants of health: the physical and social environment in which people live and the nature of their lifestyles. The experience explained in this paper shows as local authorities can support professionals in designing process, producing quick and effective benchmark in order to improve the quality of urban spaces and architecture. More in deep the tool works by a set of performance indicators developed with the purpose to assess the degree of sustainability of building and urban space proposals at the planning stage (and at later stages), against a range of criteria. This evaluation procedure can be considered as a common platform from which different stakeholders can agree goals and work together contributing to increase the benefits of a well-designed built environment.

  20. Intervention planning for a digital intervention for self-management of hypertension: a theory-, evidence- and person-based approach.

    PubMed

    Band, Rebecca; Bradbury, Katherine; Morton, Katherine; May, Carl; Michie, Susan; Mair, Frances S; Murray, Elizabeth; McManus, Richard J; Little, Paul; Yardley, Lucy

    2017-02-23

    This paper describes the intervention planning process for the Home and Online Management and Evaluation of Blood Pressure (HOME BP), a digital intervention to promote hypertension self-management. It illustrates how a Person-Based Approach can be integrated with theory- and evidence-based approaches. The Person-Based Approach to intervention development emphasises the use of qualitative research to ensure that the intervention is acceptable, persuasive, engaging and easy to implement. Our intervention planning process comprised two parallel, integrated work streams, which combined theory-, evidence- and person-based elements. The first work stream involved collating evidence from a mixed methods feasibility study, a systematic review and a synthesis of qualitative research. This evidence was analysed to identify likely barriers and facilitators to uptake and implementation as well as design features that should be incorporated in the HOME BP intervention. The second work stream used three complementary approaches to theoretical modelling: developing brief guiding principles for intervention design, causal modelling to map behaviour change techniques in the intervention onto the Behaviour Change Wheel and Normalisation Process Theory frameworks, and developing a logic model. The different elements of our integrated approach to intervention planning yielded important, complementary insights into how to design the intervention to maximise acceptability and ease of implementation by both patients and health professionals. From the primary and secondary evidence, we identified key barriers to overcome (such as patient and health professional concerns about side effects of escalating medication) and effective intervention ingredients (such as providing in-person support for making healthy behaviour changes). Our guiding principles highlighted unique design features that could address these issues (such as online reassurance and procedures for managing concerns). Causal modelling ensured that all relevant behavioural determinants had been addressed, and provided a complete description of the intervention. Our logic model linked the hypothesised mechanisms of action of our intervention to existing psychological theory. Our integrated approach to intervention development, combining theory-, evidence- and person-based approaches, increased the clarity, comprehensiveness and confidence of our theoretical modelling and enabled us to ground our intervention in an in-depth understanding of the barriers and facilitators most relevant to this specific intervention and user population.

Top