Sample records for designed constructed installed

  1. 30 CFR 75.335 - Seal strengths, design applications, and installation.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... properties, construction specifications, quality control, design references, and other information related to... 30 Mineral Resources 1 2013-07-01 2013-07-01 false Seal strengths, design applications, and... Seal strengths, design applications, and installation. (a) Seal strengths. Seals constructed on or...

  2. 30 CFR 75.335 - Seal strengths, design applications, and installation.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... properties, construction specifications, quality control, design references, and other information related to... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Seal strengths, design applications, and... Seal strengths, design applications, and installation. (a) Seal strengths. Seals constructed on or...

  3. 30 CFR 75.335 - Seal strengths, design applications, and installation.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... properties, construction specifications, quality control, design references, and other information related to... 30 Mineral Resources 1 2014-07-01 2014-07-01 false Seal strengths, design applications, and... Seal strengths, design applications, and installation. (a) Seal strengths. Seals constructed on or...

  4. 30 CFR 75.335 - Seal strengths, design applications, and installation.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... properties, construction specifications, quality control, design references, and other information related to... 30 Mineral Resources 1 2012-07-01 2012-07-01 false Seal strengths, design applications, and... Seal strengths, design applications, and installation. (a) Seal strengths. Seals constructed on or...

  5. 30 CFR 75.335 - Seal strengths, design applications, and installation.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... properties, construction specifications, quality control, design references, and other information related to... 30 Mineral Resources 1 2011-07-01 2011-07-01 false Seal strengths, design applications, and... Seal strengths, design applications, and installation. (a) Seal strengths. Seals constructed on or...

  6. 46 CFR 111.05-3 - Design, construction, and installation; general.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 4 2012-10-01 2012-10-01 false Design, construction, and installation; general. 111.05-3 Section 111.05-3 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Equipment Ground, Ground Detection, and Grounded Systems § 111.05-3 Design, construction, and...

  7. 46 CFR 111.05-3 - Design, construction, and installation; general.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 4 2014-10-01 2014-10-01 false Design, construction, and installation; general. 111.05-3 Section 111.05-3 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Equipment Ground, Ground Detection, and Grounded Systems § 111.05-3 Design, construction, and...

  8. Windows for New Construction | Efficient Windows Collaborative

    Science.gov Websites

    Foundry Foundry New Construction Windows Window Selection Tool Selection Process Design Guidance Installation Replacement Windows Window Selection Tool Assessing Options Selection Process Design Guidance Installation Understanding Windows Benefits Design Considerations Measuring Performance Performance Standards

  9. 32 CFR 634.4 - Responsibilities.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... installations by participating in traffic control studies designed to obtain information on traffic problems and... phase of engineering concerned with the planning, design, construction, and maintenance of streets, highways, and abutting lands. (2) Select, determine appropriate design, procure, construct, install, and...

  10. 32 CFR 634.4 - Responsibilities.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... installations by participating in traffic control studies designed to obtain information on traffic problems and... phase of engineering concerned with the planning, design, construction, and maintenance of streets, highways, and abutting lands. (2) Select, determine appropriate design, procure, construct, install, and...

  11. 32 CFR 634.4 - Responsibilities.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... installations by participating in traffic control studies designed to obtain information on traffic problems and... phase of engineering concerned with the planning, design, construction, and maintenance of streets, highways, and abutting lands. (2) Select, determine appropriate design, procure, construct, install, and...

  12. 32 CFR 634.4 - Responsibilities.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... installations by participating in traffic control studies designed to obtain information on traffic problems and... phase of engineering concerned with the planning, design, construction, and maintenance of streets, highways, and abutting lands. (2) Select, determine appropriate design, procure, construct, install, and...

  13. 32 CFR 634.4 - Responsibilities.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... installations by participating in traffic control studies designed to obtain information on traffic problems and... phase of engineering concerned with the planning, design, construction, and maintenance of streets, highways, and abutting lands. (2) Select, determine appropriate design, procure, construct, install, and...

  14. Manual handling of highway kerbs--focus group findings.

    PubMed

    Bust, P D; Gibb, A G F; Haslam, R A

    2005-07-01

    The manual handling of concrete highway kerbs remains commonplace in the construction industry despite obvious risks to operatives. This study was undertaken to find out why kerb installation still includes manual handling, to identify the alternatives that exist and to consider how the organisation of the work affects exposure to risk. Focus groups were held with industry professionals to discuss kerb design, installation and the training of operatives, with site visits and interviews undertaken to place the focus group findings in context. The focus group discussions highlighted manufacturer's "myopia", a lack of installation knowledge of designers and shortfalls in training for installation work. It was concluded that risks to the health of construction workers remain as they are not considered in the design of the product, design of the work or ameliorated by adequate risk assessment. Recommendations from the research are that a pro-active approach to health needs to be adopted by the manufacturers of heavy construction products. Designers of work requiring the use of heavy products need to have more experience of site operations, and education and training in manual handling is desirable at all levels in construction organisations.

  15. Design Considerations | Efficient Windows Collaborative

    Science.gov Websites

    Foundry Foundry New Construction Windows Window Selection Tool Selection Process Design Guidance Installation Replacement Windows Window Selection Tool Assessing Options Selection Process Design Guidance Installation Understanding Windows Benefits Design Considerations Measuring Performance Performance Standards

  16. 40 CFR 281.30 - New UST system design, construction, installation, and notification.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 27 2011-07-01 2011-07-01 false New UST system design, construction, installation, and notification. 281.30 Section 281.30 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES (CONTINUED) APPROVAL OF STATE UNDERGROUND STORAGE TANK PROGRAMS Criteria for No-Less-Stringent § 281.30 New UST...

  17. 40 CFR 281.30 - New UST system design, construction, installation, and notification.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 26 2010-07-01 2010-07-01 false New UST system design, construction, installation, and notification. 281.30 Section 281.30 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES (CONTINUED) APPROVAL OF STATE UNDERGROUND STORAGE TANK PROGRAMS Criteria for No-Less-Stringent § 281.30 New UST...

  18. Design Guidance for New Windows | Efficient Windows Collaborative

    Science.gov Websites

    Foundry Foundry New Construction Windows Window Selection Tool Selection Process Design Guidance Installation Replacement Windows Window Selection Tool Assessing Options Selection Process Design Guidance Installation Understanding Windows Benefits Design Considerations Measuring Performance Performance Standards

  19. Design Guidance for Replacement Windows | Efficient Windows Collaborative

    Science.gov Websites

    Foundry Foundry New Construction Windows Window Selection Tool Selection Process Design Guidance Installation Replacement Windows Window Selection Tool Assessing Options Selection Process Design Guidance Installation Understanding Windows Benefits Design Considerations Measuring Performance Performance Standards

  20. Gas Fills | Efficient Windows Collaborative

    Science.gov Websites

    Foundry Foundry New Construction Windows Window Selection Tool Selection Process Design Guidance Installation Replacement Windows Window Selection Tool Assessing Options Selection Process Design Guidance Installation Understanding Windows Benefits Design Considerations Measuring Performance Performance Standards

  1. Understanding Windows | Efficient Windows Collaborative

    Science.gov Websites

    Foundry Foundry New Construction Windows Window Selection Tool Selection Process Design Guidance Installation Replacement Windows Window Selection Tool Assessing Options Selection Process Design Guidance Installation Understanding Windows Benefits Design Considerations Measuring Performance Performance Standards

  2. Books & Publications | Efficient Windows Collaborative

    Science.gov Websites

    Foundry Foundry New Construction Windows Window Selection Tool Selection Process Design Guidance Installation Replacement Windows Window Selection Tool Assessing Options Selection Process Design Guidance Installation Understanding Windows Benefits Design Considerations Measuring Performance Performance Standards

  3. Efficient Windows Collaborative | Home

    Science.gov Websites

    Foundry Foundry New Construction Windows Window Selection Tool Selection Process Design Guidance Installation Replacement Windows Window Selection Tool Assessing Options Selection Process Design Guidance Installation Understanding Windows Benefits Design Considerations Measuring Performance Performance Standards

  4. Resources | Efficient Windows Collaborative

    Science.gov Websites

    Foundry Foundry New Construction Windows Window Selection Tool Selection Process Design Guidance Installation Replacement Windows Window Selection Tool Assessing Options Selection Process Design Guidance Installation Understanding Windows Benefits Design Considerations Measuring Performance Performance Standards

  5. Provide Views | Efficient Windows Collaborative

    Science.gov Websites

    Foundry Foundry New Construction Windows Window Selection Tool Selection Process Design Guidance Installation Replacement Windows Window Selection Tool Assessing Options Selection Process Design Guidance Installation Understanding Windows Benefits Design Considerations Measuring Performance Performance Standards

  6. Links | Efficient Windows Collaborative

    Science.gov Websites

    Foundry Foundry New Construction Windows Window Selection Tool Selection Process Design Guidance Installation Replacement Windows Window Selection Tool Assessing Options Selection Process Design Guidance Installation Understanding Windows Benefits Design Considerations Measuring Performance Performance Standards

  7. Reducing Condensation | Efficient Windows Collaborative

    Science.gov Websites

    Foundry Foundry New Construction Windows Window Selection Tool Selection Process Design Guidance Installation Replacement Windows Window Selection Tool Assessing Options Selection Process Design Guidance Installation Understanding Windows Benefits Design Considerations Measuring Performance Performance Standards

  8. Reduced Fading | Efficient Windows Collaborative

    Science.gov Websites

    Foundry Foundry New Construction Windows Window Selection Tool Selection Process Design Guidance Installation Replacement Windows Window Selection Tool Assessing Options Selection Process Design Guidance Installation Understanding Windows Benefits Design Considerations Measuring Performance Performance Standards

  9. EWC Membership | Efficient Windows Collaborative

    Science.gov Websites

    Foundry Foundry New Construction Windows Window Selection Tool Selection Process Design Guidance Installation Replacement Windows Window Selection Tool Assessing Options Selection Process Design Guidance Installation Understanding Windows Benefits Design Considerations Measuring Performance Performance Standards

  10. Visible Transmittance | Efficient Windows Collaborative

    Science.gov Websites

    Foundry Foundry New Construction Windows Window Selection Tool Selection Process Design Guidance Installation Replacement Windows Window Selection Tool Assessing Options Selection Process Design Guidance Installation Understanding Windows Benefits Design Considerations Measuring Performance Performance Standards

  11. EWC Members | Efficient Windows Collaborative

    Science.gov Websites

    Foundry Foundry New Construction Windows Window Selection Tool Selection Process Design Guidance Installation Replacement Windows Window Selection Tool Assessing Options Selection Process Design Guidance Installation Understanding Windows Benefits Design Considerations Measuring Performance Performance Standards

  12. Financing & Incentives | Efficient Windows Collaborative

    Science.gov Websites

    Foundry Foundry New Construction Windows Window Selection Tool Selection Process Design Guidance Installation Replacement Windows Window Selection Tool Assessing Options Selection Process Design Guidance Installation Understanding Windows Benefits Design Considerations Measuring Performance Performance Standards

  13. Benefits of Efficient Windows | Efficient Windows Collaborative

    Science.gov Websites

    Foundry Foundry New Construction Windows Window Selection Tool Selection Process Design Guidance Installation Replacement Windows Window Selection Tool Assessing Options Selection Process Design Guidance Installation Understanding Windows Benefits Design Considerations Measuring Performance Performance Standards

  14. Increased Light & View | Efficient Windows Collaborative

    Science.gov Websites

    Foundry Foundry New Construction Windows Window Selection Tool Selection Process Design Guidance Installation Replacement Windows Window Selection Tool Assessing Options Selection Process Design Guidance Installation Understanding Windows Benefits Design Considerations Measuring Performance Performance Standards

  15. Performance Standards for Windows | Efficient Windows Collaborative

    Science.gov Websites

    Foundry Foundry New Construction Windows Window Selection Tool Selection Process Design Guidance Installation Replacement Windows Window Selection Tool Assessing Options Selection Process Design Guidance Installation Understanding Windows Benefits Design Considerations Measuring Performance Performance Standards

  16. Window Selection Tool | Efficient Windows Collaborative

    Science.gov Websites

    Foundry Foundry New Construction Windows Window Selection Tool Selection Process Design Guidance Installation Replacement Windows Window Selection Tool Assessing Options Selection Process Design Guidance Installation Understanding Windows Benefits Design Considerations Measuring Performance Performance Standards

  17. Air Leakage (AL) | Efficient Windows Collaborative

    Science.gov Websites

    Foundry Foundry New Construction Windows Window Selection Tool Selection Process Design Guidance Installation Replacement Windows Window Selection Tool Assessing Options Selection Process Design Guidance Installation Understanding Windows Benefits Design Considerations Measuring Performance Performance Standards

  18. State Fact Sheets | Efficient Windows Collaborative

    Science.gov Websites

    Foundry Foundry New Construction Windows Window Selection Tool Selection Process Design Guidance Installation Replacement Windows Window Selection Tool Assessing Options Selection Process Design Guidance Installation Understanding Windows Benefits Design Considerations Measuring Performance Performance Standards

  19. Fact Sheets & Publications | Efficient Windows Collaborative

    Science.gov Websites

    Foundry Foundry New Construction Windows Window Selection Tool Selection Process Design Guidance Installation Replacement Windows Window Selection Tool Assessing Options Selection Process Design Guidance Installation Understanding Windows Benefits Design Considerations Measuring Performance Performance Standards

  20. Condensation Resistance (CR) | Efficient Windows Collaborative

    Science.gov Websites

    Foundry Foundry New Construction Windows Window Selection Tool Selection Process Design Guidance Installation Replacement Windows Window Selection Tool Assessing Options Selection Process Design Guidance Installation Understanding Windows Benefits Design Considerations Measuring Performance Performance Standards

  1. Assessing Window Replacement Options | Efficient Windows Collaborative

    Science.gov Websites

    Foundry Foundry New Construction Windows Window Selection Tool Selection Process Design Guidance Installation Replacement Windows Window Selection Tool Assessing Options Selection Process Design Guidance Installation Understanding Windows Benefits Design Considerations Measuring Performance Performance Standards

  2. National Fenestration Rating Council (NFRC) | Efficient Windows

    Science.gov Websites

    Collaborative Foundry Foundry New Construction Windows Window Selection Tool Selection Process Design Guidance Installation Replacement Windows Window Selection Tool Assessing Options Selection Process Design Guidance Installation Understanding Windows Benefits Design Considerations Measuring

  3. Low Conductance Spacers | Efficient Windows Collaborative

    Science.gov Websites

    Foundry Foundry New Construction Windows Window Selection Tool Selection Process Design Guidance Installation Replacement Windows Window Selection Tool Assessing Options Selection Process Design Guidance Installation Understanding Windows Benefits Design Considerations Measuring Performance Performance Standards

  4. Energy & Cost Savings | Efficient Windows Collaborative

    Science.gov Websites

    Foundry Foundry New Construction Windows Window Selection Tool Selection Process Design Guidance Installation Replacement Windows Window Selection Tool Assessing Options Selection Process Design Guidance Installation Understanding Windows Benefits Design Considerations Measuring Performance Performance Standards

  5. U-Factor (U-value) | Efficient Windows Collaborative

    Science.gov Websites

    Foundry Foundry New Construction Windows Window Selection Tool Selection Process Design Guidance Installation Replacement Windows Window Selection Tool Assessing Options Selection Process Design Guidance Installation Understanding Windows Benefits Design Considerations Measuring Performance Performance Standards

  6. Selection Process for New Windows | Efficient Windows Collaborative

    Science.gov Websites

    Foundry Foundry New Construction Windows Window Selection Tool Selection Process Design Guidance Installation Replacement Windows Window Selection Tool Assessing Options Selection Process Design Guidance Installation Understanding Windows Benefits Design Considerations Measuring Performance Performance Standards

  7. Selection Process for Replacement Windows | Efficient Windows Collaborative

    Science.gov Websites

    Foundry Foundry New Construction Windows Window Selection Tool Selection Process Design Guidance Installation Replacement Windows Window Selection Tool Assessing Options Selection Process Design Guidance Installation Understanding Windows Benefits Design Considerations Measuring Performance Performance Standards

  8. Solar Heat Gain Coefficient (SHGC) | Efficient Windows Collaborative

    Science.gov Websites

    Foundry Foundry New Construction Windows Window Selection Tool Selection Process Design Guidance Installation Replacement Windows Window Selection Tool Assessing Options Selection Process Design Guidance Installation Understanding Windows Benefits Design Considerations Measuring Performance Performance Standards

  9. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sandvik, K.; Karal, K.

    The paper gives a general description of the Concrete Gravity Base Structure (GBS) for the Draugen platform installed by Norwegian Contractors a.s. The GBS was installed at the Haltenbank area on the Norwegian continental shelf in May 1993 for A/S Norske Shell. Further, the paper describes the following challenging aspects encountered during the design and construction: design for high frequency response to wave loading, so called ringing, discovered during construction of the GBS; impact of the ringing effect discovery on the construction schedule; design to prevent delamination of concrete structural elements; modifications to prevent damages on pipe work caused bymore » deformations of the concrete structure.« less

  10. 24 CFR 3285.103 - Site suitability with design zone maps.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... HOUSING AND URBAN DEVELOPMENT MODEL MANUFACTURED HOME INSTALLATION STANDARDS Pre-Installation....305(c)(2) of the Manufactured Home Construction and Safety Standards in this chapter. (b) Roof load... § 3280.305(c)(3) of the Manufactured Home Construction and Safety Standards in this chapter. Refer to...

  11. 24 CFR 3285.103 - Site suitability with design zone maps.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... HOUSING AND URBAN DEVELOPMENT MODEL MANUFACTURED HOME INSTALLATION STANDARDS Pre-Installation....305(c)(2) of the Manufactured Home Construction and Safety Standards in this chapter. (b) Roof load... § 3280.305(c)(3) of the Manufactured Home Construction and Safety Standards in this chapter. Refer to...

  12. 24 CFR 3285.103 - Site suitability with design zone maps.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... HOUSING AND URBAN DEVELOPMENT MODEL MANUFACTURED HOME INSTALLATION STANDARDS Pre-Installation....305(c)(2) of the Manufactured Home Construction and Safety Standards in this chapter. (b) Roof load... § 3280.305(c)(3) of the Manufactured Home Construction and Safety Standards in this chapter. Refer to...

  13. 46 CFR 58.10-15 - Gas turbine installations.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... MACHINERY AND RELATED SYSTEMS Internal Combustion Engine Installations § 58.10-15 Gas turbine installations. (a) Standards. The design, construction, workmanship and tests of gas turbines and their associated... 46 Shipping 2 2010-10-01 2010-10-01 false Gas turbine installations. 58.10-15 Section 58.10-15...

  14. 46 CFR 58.10-15 - Gas turbine installations.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... MACHINERY AND RELATED SYSTEMS Internal Combustion Engine Installations § 58.10-15 Gas turbine installations. (a) Standards. The design, construction, workmanship and tests of gas turbines and their associated... 46 Shipping 2 2011-10-01 2011-10-01 false Gas turbine installations. 58.10-15 Section 58.10-15...

  15. Design and installation of a next generation pilot scale fermentation system.

    PubMed

    Junker, B; Brix, T; Lester, M; Kardos, P; Adamca, J; Lynch, J; Schmitt, J; Salmon, P

    2003-01-01

    Four new fermenters were designed and constructed for use in secondary metabolite cultivations, bioconversions, and enzyme production. A new PC/PLC-based control system also was implemented using GE Fanuc PLCs, Genius I/O blocks, and Fix Dynamics SCADA software. These systems were incorporated into an industrial research fermentation pilot plant, designed and constructed in the early 1980s. Details of the design of these new fermenters and the new control system are described and compared with the existing installation for expected effectiveness. In addition, the reasoning behind selection of some of these features has been included. Key to the design was the goal of preserving similarity between the new and previously existing and successfully utilized fermenter hardware and software installations where feasible but implementing improvements where warranted and beneficial. Examples of enhancements include strategic use of Inconel as a material of construction to reduce corrosion, piping layout design for simplified hazardous energy isolation, on-line calculation and control of nutrient feed rates, and the use of field I/O modules located near the vessel to permit low-cost addition of new instrumentation.

  16. 14 CFR 25.655 - Installation.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 1 2010-01-01 2010-01-01 false Installation. 25.655 Section 25.655 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION AIRCRAFT AIRWORTHINESS STANDARDS: TRANSPORT CATEGORY AIRPLANES Design and Construction Control Surfaces § 25.655 Installation. (a...

  17. 14 CFR 25.655 - Installation.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 14 Aeronautics and Space 1 2011-01-01 2011-01-01 false Installation. 25.655 Section 25.655 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION AIRCRAFT AIRWORTHINESS STANDARDS: TRANSPORT CATEGORY AIRPLANES Design and Construction Control Surfaces § 25.655 Installation. (a...

  18. 14 CFR 25.655 - Installation.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 14 Aeronautics and Space 1 2012-01-01 2012-01-01 false Installation. 25.655 Section 25.655 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION AIRCRAFT AIRWORTHINESS STANDARDS: TRANSPORT CATEGORY AIRPLANES Design and Construction Control Surfaces § 25.655 Installation. (a...

  19. 14 CFR 25.655 - Installation.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 14 Aeronautics and Space 1 2014-01-01 2014-01-01 false Installation. 25.655 Section 25.655 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION AIRCRAFT AIRWORTHINESS STANDARDS: TRANSPORT CATEGORY AIRPLANES Design and Construction Control Surfaces § 25.655 Installation. (a...

  20. EOC construction update

    NASA Technical Reports Server (NTRS)

    2007-01-01

    Work on Stennis Space Center's new Emergency Operations Center is progressing on schedule, according to Robert Perkins, construction manager with Jacobs Technology. At the turn of the New Year, construction contractors had completed the pervious paving for the north and west parking lots. Part of the facility's `green' design, pervious paving allows water to pass through and be absorbed directly into the ground below, preventing erosion from runoff. Through January, workers concentrated on installing the roof, sprinkler piping and overhead cable trays for electrical and communication lines. The next step will be interior work, erecting wallboard and installing electrical equipment. Perkins said NASA seeks to earn a Silver LEED (Leadership in Energy and Environmental Design) Rating for the project's environmentally-friendly and sustainable design, construction and operation. The facility has a projected completion date of February 2009.

  1. EOC construction update

    NASA Image and Video Library

    2007-12-30

    Work on Stennis Space Center's new Emergency Operations Center is progressing on schedule, according to Robert Perkins, construction manager with Jacobs Technology. At the turn of the New Year, construction contractors had completed the pervious paving for the north and west parking lots. Part of the facility's `green' design, pervious paving allows water to pass through and be absorbed directly into the ground below, preventing erosion from runoff. Through January, workers concentrated on installing the roof, sprinkler piping and overhead cable trays for electrical and communication lines. The next step will be interior work, erecting wallboard and installing electrical equipment. Perkins said NASA seeks to earn a Silver LEED (Leadership in Energy and Environmental Design) Rating for the project's environmentally-friendly and sustainable design, construction and operation. The facility has a projected completion date of February 2009.

  2. 24 CFR 3286.505 - Minimum elements to be inspected.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... with respect to home design and construction; (b) Consideration of site-specific conditions; (c) Site... HOUSING AND URBAN DEVELOPMENT MANUFACTURED HOME INSTALLATION PROGRAM Inspection of Installations in HUD-Administered States § 3286.505 Minimum elements to be inspected. The installation of every manufactured home...

  3. 46 CFR 77.03-1 - Installation and details.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) PASSENGER VESSELS VESSEL CONTROL AND MISCELLANEOUS SYSTEMS AND EQUIPMENT Marine Engineering Systems § 77.03-1 Installation and details. (a) The installation of all systems of a marine engineering nature, together with the details of design, construction...

  4. Static Frequency Converter System Installed and Tested

    NASA Technical Reports Server (NTRS)

    Brown, Donald P.; Sadhukhan, Debashis

    2003-01-01

    A new Static Frequency Converter (SFC) system has been installed and tested at the NASA Glenn Research Center s Central Air Equipment Building to provide consistent, reduced motor start times and improved reliability for the building s 14 large exhausters and compressors. The operational start times have been consistent around 2 min, 20 s per machine. This is at least a 3-min improvement (per machine) over the old variable-frequency motor generator sets. The SFC was designed and built by Asea Brown Boveri (ABB) and installed by Encompass Design Group (EDG) as part of a Construction of Facilities project managed by Glenn (Robert Scheidegger, project manager). The authors designed the Central Process Distributed Control Systems interface and control between the programmable logic controller, solid-state exciter, and switchgear, which was constructed by Gilcrest Electric.

  5. Design, installation, and condition assessment of a concrete bridge deck constructed with ASTM A1035 CS no. 4 bars.

    DOT National Transportation Integrated Search

    2017-06-01

    Recently developed corrosion-resistant reinforcing structural design guidelines were used to design, construct, and : assess a reinforced concrete bridge deck with high-strength ASTM A1035 CS steel bars. The bridge replacement is located : along the ...

  6. 24 CFR 3280.1 - Scope.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... MANUFACTURED HOME CONSTRUCTION AND SAFETY STANDARDS General § 3280.1 Scope. This standard covers all equipment and installations in the design, construction, transportation, fire safety, plumbing, heat-producing...

  7. 24 CFR 3280.1 - Scope.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... MANUFACTURED HOME CONSTRUCTION AND SAFETY STANDARDS General § 3280.1 Scope. This standard covers all equipment and installations in the design, construction, transportation, fire safety, plumbing, heat-producing...

  8. 24 CFR 3280.1 - Scope.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... MANUFACTURED HOME CONSTRUCTION AND SAFETY STANDARDS General § 3280.1 Scope. This standard covers all equipment and installations in the design, construction, transportation, fire safety, plumbing, heat-producing...

  9. 24 CFR 3280.1 - Scope.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... MANUFACTURED HOME CONSTRUCTION AND SAFETY STANDARDS General § 3280.1 Scope. This standard covers all equipment and installations in the design, construction, transportation, fire safety, plumbing, heat-producing...

  10. 46 CFR 162.161-5 - Instruction manual for design, installation, operation, and maintenance.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 6 2014-10-01 2014-10-01 false Instruction manual for design, installation, operation, and maintenance. 162.161-5 Section 162.161-5 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) EQUIPMENT, CONSTRUCTION, AND MATERIALS: SPECIFICATIONS AND APPROVAL ENGINEERING EQUIPMENT Fixed Clean Agent Fire Extinguishing Systems §...

  11. Design Methodology for Automated Construction Machines

    DTIC Science & Technology

    1987-12-11

    along with the design of a pair of machines which automate framework installation.-,, 20. DISTRIBUTION IAVAILABILITY OF ABSTRACT 21. ABSTRACT SECURITY... Development Assistant Professor of Civil Engineering and Laura A . Demsetz, David H. Levy, Bruce Schena Graduate Research Assistants December 11, 1987 U.S...are discussed along with the design of a pair of machines which automate framework installation. Preliminary analysis and testing indicate that these

  12. 33 CFR 157.12c - Construction, maintenance, security, calibration, and training.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... RELATING TO TANK VESSELS CARRYING OIL IN BULK Design, Equipment, and Installation § 157.12c Construction... designed to ensure that user access is restricted to essential controls. Access beyond these controls must... of a design that only the manufacturer or the manufacturer's agent can replace the seals or reset the...

  13. 33 CFR 157.12c - Construction, maintenance, security, calibration, and training.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... RELATING TO TANK VESSELS CARRYING OIL IN BULK Design, Equipment, and Installation § 157.12c Construction... designed to ensure that user access is restricted to essential controls. Access beyond these controls must... of a design that only the manufacturer or the manufacturer's agent can replace the seals or reset the...

  14. 33 CFR 157.12c - Construction, maintenance, security, calibration, and training.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... RELATING TO TANK VESSELS CARRYING OIL IN BULK Design, Equipment, and Installation § 157.12c Construction... designed to ensure that user access is restricted to essential controls. Access beyond these controls must... of a design that only the manufacturer or the manufacturer's agent can replace the seals or reset the...

  15. 33 CFR 157.12c - Construction, maintenance, security, calibration, and training.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... RELATING TO TANK VESSELS CARRYING OIL IN BULK Design, Equipment, and Installation § 157.12c Construction... designed to ensure that user access is restricted to essential controls. Access beyond these controls must... of a design that only the manufacturer or the manufacturer's agent can replace the seals or reset the...

  16. Problems of Technology of Energy-Saving Buildings and Their Impact on Energy Efficiency in Buildings

    NASA Astrophysics Data System (ADS)

    Kwasnowski, Pawel; Fedorczak-Cisak, Malgorzata; Knap, Katarzyna

    2017-10-01

    Introduction of EPBD in legislation of the EU member states caused that buildings must meet very stringent requirements of thermal protection and energy efficiency. On the basis of EPBD provisions, EU Member States introduce standard of NZEB (Nearly Zero-Energy Buildings). Such activities cause a need for new, innovative materials and technologies, and new approaches to design, construction and retrofitting of buildings. Indispensable is the precise coordination of the design of structure and technical installations of building, which may be provided in an integrated design process in the system BIM. Good coordination and cooperation of all contractors during the construction phase is also necessary. The article presents the problems and the new methodology for the design, construction and use of energy efficient buildings in terms of energy saving technologies, including discussion of the significant impact of the automation of technical installations on the building energy efficiency.

  17. 14 CFR 23.655 - Installation.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 14 Aeronautics and Space 1 2012-01-01 2012-01-01 false Installation. 23.655 Section 23.655 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION AIRCRAFT AIRWORTHINESS STANDARDS: NORMAL, UTILITY, ACROBATIC, AND COMMUTER CATEGORY AIRPLANES Design and Construction Control...

  18. 14 CFR 23.655 - Installation.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 14 Aeronautics and Space 1 2014-01-01 2014-01-01 false Installation. 23.655 Section 23.655 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION AIRCRAFT AIRWORTHINESS STANDARDS: NORMAL, UTILITY, ACROBATIC, AND COMMUTER CATEGORY AIRPLANES Design and Construction Control...

  19. 14 CFR 23.655 - Installation.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 1 2010-01-01 2010-01-01 false Installation. 23.655 Section 23.655 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION AIRCRAFT AIRWORTHINESS STANDARDS: NORMAL, UTILITY, ACROBATIC, AND COMMUTER CATEGORY AIRPLANES Design and Construction Control...

  20. 14 CFR 23.655 - Installation.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 14 Aeronautics and Space 1 2013-01-01 2013-01-01 false Installation. 23.655 Section 23.655 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION AIRCRAFT AIRWORTHINESS STANDARDS: NORMAL, UTILITY, ACROBATIC, AND COMMUTER CATEGORY AIRPLANES Design and Construction Control...

  1. 14 CFR 23.655 - Installation.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 14 Aeronautics and Space 1 2011-01-01 2011-01-01 false Installation. 23.655 Section 23.655 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION AIRCRAFT AIRWORTHINESS STANDARDS: NORMAL, UTILITY, ACROBATIC, AND COMMUTER CATEGORY AIRPLANES Design and Construction Control...

  2. Sustainable Design of EPA's Campus in Research Triangle Park, NC—Environmental Performance Specifications in Construction Contracts—Section 01450 Sequence of Finishes Installation

    EPA Pesticide Factsheets

    Learn more about the special construction scheduling/sequencing requirements and procedures necessary to assure achievement of designed Indoor Air Quality (IAQ) levels for the completed project required by the EPA IAQ Program.

  3. Measure Guideline: Summary of Interior Ducts in New Construction, Including an Efficient, Affordable Method to Install Fur-Down Interior Ducts

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Beal, D.; McIlvaine , J.; Fonorow, K.

    2011-11-01

    This document illustrates guidelines for the efficient installation of interior duct systems in new housing, including the fur-up chase method, the fur-down chase method, and interior ducts positioned in sealed attics or sealed crawl spaces. This document illustrates guidelines for the efficient installation of interior duct systems in new housing. Interior ducts result from bringing the duct work inside a home's thermal and air barrier. Architects, designers, builders, and new home buyers should thoroughly investigate any opportunity for energy savings that is as easy to implement during construction, such as the opportunity to construct interior duct work. In addition tomore » enhanced energy efficiency, interior ductwork results in other important advantages, such as improved indoor air quality, increased system durability and increased homeowner comfort. While the advantages of well-designed and constructed interior duct systems are recognized, the implementation of this approach has not gained a significant market acceptance. This guideline describes a variety of methods to create interior ducts including the fur-up chase method, the fur-down chase method, and interior ducts positioned in sealed attics or sealed crawl spaces. As communication of the intent of an interior duct system, and collaboration on its construction are paramount to success, this guideline details the critical design, planning, construction, inspection, and verification steps that must be taken. Involved in this process are individuals from the design team; sales/marketing team; and mechanical, insulation, plumbing, electrical, framing, drywall and solar contractors.« less

  4. 46 CFR 61.35-1 - General.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... equipment must be tested and inspected to verify their proper design, construction, installation, and operation. (d) All tests must be performed after installation of the automatic auxiliary boiler and its... monitored system conditions by misadjustment, artificial signals, improper wiring, tampering, or revision of...

  5. Calendar years 1989 and 1990 monitoring well installation program Y-12 plant, Oak Ridge, Tennessee

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1991-10-01

    This report documents the well-construction activities at the Y-12 Plant in Oak Ridge, Tennessee during 1989 and 1990. The well- construction program consisted of installing seventy-five monitoring wells. Geologists from ERCE (formally the Engineering, Design and Geosciences Group) and Martin Marietta Energy Systems (Energy Systems), supervised and documented well-construction activities and monitored for health and safety concerns. Sixty-seven monitoring wells were installed under the supervision of an ERCE geologist from March 1989 to September 1990. Beginning in September 1990, Energy Systems supervised drilling activities for eight monitoring wells, the last of which was completed in December 1990. 9 refs., 3more » figs., 2 tabs.« less

  6. Black Creek Hydro Project high-line cable penstock installation

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Fonnesbeck, K.C.; Ellicock, R.

    1995-12-31

    The Black Creek Hydro Project is a remote, high head, run-of-river, small hydro project located near Seattle, Washington. The comparatively small size of this project was not indicative of the difficulties and challenges presented to the design engineers and construction contractors involved in it`s completion. The most difficult of these challenges was the design and installation of a buried penstock on very steep and heavily forested terrain. This paper will concentrate on construction of the Black Creek penstock, and specifically, that portion of the penstock which required innovative application of a suspended {open_quotes}high-line{close_quotes} cable operation as used is commonly formore » logging of steep slopes. For this project, the cable installation and yarder equipment were utilized for a variety of purposes including, clearing and logging of the slope, to secure heavy equipment and machinery required to excavate the penstock trench, transport and placement of the individual pipe joints and finally to encase the pipe with lean concrete. The successful application of this approach contributed greatly to the timely completion of the project. This paper will offer background information on the selection and design of the cable Installation as well as highlights of the solutions that were developed to overcome the design and construction problems encountered. Finally, cost data will be offered to those who may be faced with similar undertakings caused by the steep and difficult sites attracting more attention in present days.« less

  7. Best practices for quality management of stormwater pipe construction.

    DOT National Transportation Integrated Search

    2014-02-01

    Stormwater pipe systems are integral features of transportation construction projects. Pipe culverts : direct stormwater away from roadway structures and towards designated discharge areas. The improper : installation of a pipe culvert can result in ...

  8. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Wissemann, Chris; White, Stanley M

    The primary objective of the project was to develop a innovative Gravity Base Foundation (GBF) concepts, including fabrication yards, launching systems and installation equipment, for a 500MW utility scale project in the Great Lakes (Lake Erie). The goal was to lower the LCOE by 25%. The project was the first to investigate an offshore wind project in the Great Lakes and it has furthered the body of knowledge for foundations and installation methods within Lake Erie. The project collected historical geotechnical information for Lake Erie and also used recently obtained data from the LEEDCo Icebreaker Project (FOA DE-EE0005989) geotechnical programmore » to develop the conceptual designs. Using these data-sets, the project developed design wind and wave conditions from actual buoy data in order to develop a concept that would de-risk a project using a GBF. These wind and wave conditions were then utilized to create reference designs for various foundations specific to installation in Lake Erie. A project partner on the project (Weeks Marine) provided input for construction and costing the GBF fabrication and installation. By having a marine contractor with experience with large marine projects as part of the team provides credibility to the LCOE developed by NREL. NREL then utilized the design and construction costing information as part of the LCOE model. The report summarizes the findings of the project; Developed a cost model and “baseline” LCOE; Documented Site Conditions within Lake Erie; Developed Fabrication, Installation and Foundations Innovative Concept Designs; Evaluated LCOE Impact of Innovations; Developed Assembly line “Rail System” for GBF Construction and Staging; Developed Transit-Inspired Foundation Designs which incorporated: Semi-Floating Transit with Supplemental Pontoons Barge mounted Winch System; Developed GBF with “Penetration Skirt”; Developed Integrated GBF with Turbine Tower; Developed Turbine, Plant Layout and O&M Strategies. The report details lowering LCOE by 22.3% and identified additional strategies that could further lower LCOE when building an utility scale wind farm in the Great Lakes.« less

  9. Little Goose Dam Full Flow PIT-Tag Detection System Project Summary.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Warf, Don; Livingston, Scott

    2009-04-16

    In 2006, the design phase of this project was kicked off and was for the most part modeled after the Full Flow PIT installation installed at Lower Monumental Dam during winter and spring of 2006 and 2007. As the Goose Full Flow design progressed and the project started to move towards construction, issues within contracting occurred and the project was put on delay for 1 year. Starting in mid December of 2008, Harcon Inc. was awarded the contract and construction of the new Goose Full Flow PIT-tag detection system began. The purpose of this document is to summarize the installationmore » of the Little Goose Full Flow project from start to finish and to highlight the notable successes and challenges that the installation presented along with the final results and current status.« less

  10. Design and construction of the astronautics refrigerator magnet

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Dresner, L.

    1994-05-01

    This document reports on the design, construction, and testing of a 7-Tesla, 4-in. bore superconducting magnet for use in the Astronautics Refrigerator Experiment. The magnet is a single-strand, layer-wound, potted solenoid wound with Formvar-insulated SSC strands. The magnet was constructed by American Magnetics, Inc. of Oak Ridge and has been installed in the Astronautics Refrigerator Experiment at the Astronautics Technology Center in Madison, Wisconsin.

  11. 40 CFR 125.94 - How will requirements reflecting best technology available for minimizing adverse environmental...

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... in your facility's watershed in place of or as a supplement to installing design and control... construction, operational, maintenance, monitoring, and adaptive management requirements of a Technology..., and adaptive management requirements of your Technology Installation and Operation Plan during the...

  12. 40 CFR 125.94 - How will requirements reflecting best technology available for minimizing adverse environmental...

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... in your facility's watershed in place of or as a supplement to installing design and control... construction, operational, maintenance, monitoring, and adaptive management requirements of a Technology..., and adaptive management requirements of your Technology Installation and Operation Plan during the...

  13. 40 CFR 125.94 - How will requirements reflecting best technology available for minimizing adverse environmental...

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... in your facility's watershed in place of or as a supplement to installing design and control... construction, operational, maintenance, monitoring, and adaptive management requirements of a Technology..., and adaptive management requirements of your Technology Installation and Operation Plan during the...

  14. 40 CFR 125.94 - How will requirements reflecting best technology available for minimizing adverse environmental...

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... in your facility's watershed in place of or as a supplement to installing design and control... construction, operational, maintenance, monitoring, and adaptive management requirements of a Technology..., and adaptive management requirements of your Technology Installation and Operation Plan during the...

  15. Solar hot water space heating system. Technical progress report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Van Dam, T

    1979-08-13

    A retrofit solar heating system was installed on Madison Hall at Jordan College, Cedar Springs, Michigan. The system provides heating and domestic water preheating for a campus dormitory. Freeze protection is provided by a draindown system. The building and solar system, construction progress, and design changes are described. Included in appendices are: condensate trap design, structural analysis, pictures of installation, operating instructions, maintenance instructions, and as-built drawings. (MHR)

  16. Design, construction and operation features of high-rise structures

    NASA Astrophysics Data System (ADS)

    Mylnik, Alexey; Mylnik, Vladimir; Zubeeva, Elena; Mukhamedzhanova, Olga

    2018-03-01

    The article considers design, construction and operation features of high-rise facilities. The analysis of various situations, that come from improper designing, construction and operation of unique facilities, is carried out. The integrated approach is suggested, when the problems of choosing acceptable constructional solutions related to the functional purpose, architectural solutions, methods of manufacturing and installation, operating conditions for unique buildings and structures are being tackled. A number of main causes for the emergency destruction of objects under construction and operation is considered. A number of measures are proposed on the basis of factor classification in order to efficiently prevent the situations, when various negative options of design loads and emergency impacts occur.

  17. Construction, Startup and Operation of a New LLRW Disposal Facility in Andrews County, Texas - 12151

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Van Vliet, James A.

    2012-07-01

    During this last year, Waste Control Specialists LLC (WCS) completed construction and achieved start of operations of a new low level radioactive waste (LLRW) disposal facility in Andrews County Texas. Disposal operations are underway for commercial LLRW, and start up evolutions are in progress for disposal of Department of Energy (DOE) LLRW. The overall approach to construction and start up are presented as well as some of the more significant challenges and how they were addressed to achieve initial operations of the first new commercial low level radioactive waste disposal facility in more than 30 years. The WCS disposal facilitymore » consists of two LLRW disposal cells, one for Texas Compact waste, and a separate disposal cell for DOE waste. Both disposal cells have very robust and unique designs. The cells themselves are constructed entirely in very low permeability red bed clay. The cell liners include a 0.91 meter thick clay liner meeting unprecedented permeability limits, 0.3 meter thick reinforced concrete barriers, as well as the standard geo-synthetic liners. Actions taken to meet performance criteria and install these liners will be discussed. Consistent with this highly protective landfill design, WCS chose to install a zero discharge site water management system. The considerations behind the design and construction of this system will be presented. Other activities essential to successful start of LLRW disposal operations included process and procedure development and refinement, staffing and staff development, and training. Mock ups were built and used for important evolutions and functions. Consistent with the extensive regulation of LLRW operations, engagement with the Texas Commission on Environmental Quality (TCEQ) was continuous and highly interactive. This included daily activity conference calls, weekly coordination calls and numerous topical conference calls and meetings. TCEQ staff and consultants frequently observed specific construction evolutions, such as geological feature mapping of designated excavation faces, disposal cell clay liner installation, disposal cell concrete barrier construction, etc. (author)« less

  18. Project Report: Design and Analysis for the Deep Space Network BWG Type 2 Antenna Feed Platform

    NASA Technical Reports Server (NTRS)

    Crawford, Andrew

    2011-01-01

    The following report explains in detail the solid modeling design process and structural analysis of the LNA (Low Noise Amplifier) feed platform to be constructed and installed on the new BWG (Beam Wave Guide) Type-2 tracking antenna in Canberra, Australia, as well as all future similar BWG Type-2 antennas builds. The Deep Space Networks new BWG Type-2 antennas use beam waveguides to funnel and 'extract' the desired signals received from spacecraft, and the feed platform supports and houses the LNA(Low Noise Amplifier) feed-cone and cryogenic cooling equipment used in the signal transmission and receiving process. The mandated design and construction of this platform to be installed on the new tracking antenna will be used and incorporated on all future similar antenna builds.

  19. Radon mitigation in domestic properties and its health implications--a comparison between during-construction and post-construction radon reduction.

    PubMed

    Groves-Kirkby, C J; Denman, A R; Phillips, P S; Crockett, R G M; Woolridge, A C; Tornberg, R

    2006-05-01

    Although United Kingdom (UK) Building Regulations applicable to houses constructed since 1992 in Radon Affected Areas address the health issues arising from the presence of radon in domestic properties and specify the installation of radon-mitigation measures during construction, no legislative requirement currently exists for monitoring the effectiveness of such remediation once construction is completed and the houses are occupied. To assess the relative effectiveness of During-Construction radon reduction and Post-Construction remediation, radon concentration data from houses constructed before and after 1992 in Northamptonshire, UK, a designated Radon Affected Area, was analysed. Post-Construction remediation of 73 pre-1992 houses using conventional fan-assisted sump technology proved to be extremely effective, with radon concentrations reduced to the Action Level, or below, in all cases. Of 64 houses constructed since 1992 in a well-defined geographical area, and known to have had radon-barrier membranes installed during construction, 11% exhibited radon concentrations in excess of the Action Level. This compares with the estimated average for all houses in the same area of 17%, suggesting that, in some 60% of the houses surveyed, installation of a membrane has not resulted in reduction of mean annual radon concentrations to below the Action Level. Detailed comparison of the two data sets reveals marked differences in the degree of mitigation achieved by remediation. There is therefore an ongoing need for research to resolve definitively the issue of radon mitigation and to define truly effective anti-radon measures, readily installed in domestic properties at the time of construction. It is therefore recommended that mandatory testing be introduced for all new houses in Radon Affected Areas.

  20. 24 CFR 3286.305 - Installation trainer criteria.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... building construction industry; (iii) In design work related to the building construction industry; or (2... curriculum. In order to register as a qualified trainer, an individual or other training entity must submit... curriculum requirements established in § 3286.308 or § 3286.309, as applicable. ...

  1. 24 CFR 3286.305 - Installation trainer criteria.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... building construction industry; (iii) In design work related to the building construction industry; or (2... curriculum. In order to register as a qualified trainer, an individual or other training entity must submit... curriculum requirements established in § 3286.308 or § 3286.309, as applicable. ...

  2. 7 CFR 1470.24 - Payments.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... participant associated with planning, design, materials, installation, labor, management, maintenance, or..., construction, or maintenance of animal waste storage or treatment facilities or associated waste transport or...

  3. Foundation Heat Exchanger Final Report: Demonstration, Measured Performance, and Validated Model and Design Tool

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hughes, Patrick; Im, Piljae

    2012-04-01

    Geothermal heat pumps, sometimes called ground-source heat pumps (GSHPs), have been proven capable of significantly reducing energy use and peak demand in buildings. Conventional equipment for controlling the temperature and humidity of a building, or supplying hot water and fresh outdoor air, must exchange energy (or heat) with the building's outdoor environment. Equipment using the ground as a heat source and heat sink consumes less non-renewable energy (electricity and fossil fuels) because the earth is cooler than outdoor air in summer and warmer in winter. The most important barrier to rapid growth of the GSHP industry is high first costmore » of GSHP systems to consumers. The most common GSHP system utilizes a closed-loop ground heat exchanger. This type of GSHP system can be used almost anywhere. There is reason to believe that reducing the cost of closed-loop systems is the strategy that would achieve the greatest energy savings with GSHP technology. The cost premium of closed-loop GSHP systems over conventional space conditioning and water heating systems is primarily associated with drilling boreholes or excavating trenches, installing vertical or horizontal ground heat exchangers, and backfilling the excavations. This project investigates reducing the cost of horizontal closed-loop ground heat exchangers by installing them in the construction excavations, augmented when necessary with additional trenches. This approach applies only to new construction of residential and light commercial buildings or additions to such buildings. In the business-as-usual scenario, construction excavations are not used for the horizontal ground heat exchanger (HGHX); instead the HGHX is installed entirely in trenches dug specifically for that purpose. The potential cost savings comes from using the construction excavations for the installation of ground heat exchangers, thereby minimizing the need and expense of digging additional trenches. The term foundation heat exchanger (FHX) has been coined to refer exclusively to ground heat exchangers installed in the overcut around the basement walls. The primary technical challenge undertaken by this project was the development and validation of energy performance models and design tools for FHX. In terms of performance modeling and design, ground heat exchangers in other construction excavations (e.g., utility trenches) are no different from conventional HGHX, and models and design tools for HGHX already exist. This project successfully developed and validated energy performance models and design tools so that FHX or hybrid FHX/HGHX systems can be engineered with confidence, enabling this technology to be applied in residential and light commercial buildings. The validated energy performance model also addresses and solves another problem, the longstanding inadequacy in the way ground-building thermal interaction is represented in building energy models, whether or not there is a ground heat exchanger nearby. Two side-by-side, three-level, unoccupied research houses with walkout basements, identical 3,700 ft{sup 2} floor plans, and hybrid FHX/HGHX systems were constructed to provide validation data sets for the energy performance model and design tool. The envelopes of both houses are very energy efficient and airtight, and the HERS ratings of the homes are 44 and 45 respectively. Both houses are mechanically ventilated with energy recovery ventilators, with space conditioning provided by water-to-air heat pumps with 2 ton nominal capacities. Separate water-to-water heat pumps with 1.5 ton nominal capacities were used for water heating. In these unoccupied research houses, human impact on energy use (hot water draw, etc.) is simulated to match the national average. At House 1 the hybrid FHX/HGHX system was installed in 300 linear feet of excavation, and 60% of that was construction excavation (needed to construct the home). At House 2 the hybrid FHX/HGHX system was installed in 360 feet of excavation, 50% of which was construction excavation. There are six pipes in all excavations (three parallel circuits - out and back), and the multiple instances of FHX and/or HGHX are all connected in series. The working fluid is 20% by weight propylene glycol in water. Model and design tool development was undertaken in parallel with constructing the houses, installing instrumentation, and monitoring performance for a year. Several detailed numerical models for FHX were developed as part of the project. Essentially the project team was searching for an energy performance model accurate enough to achieve project objectives while also having sufficient computational efficiency for practical use in EnergyPlus. A 3-dimensional, dual-coordinate-system, finite-volume model satisfied these criteria and was included in the October 2011 EnergyPlus Version 7 public release after being validated against measured data.« less

  4. Photovoltaic balance-of-system designs and costs at PVUSA

    NASA Astrophysics Data System (ADS)

    Reyes, A. B.; Jennings, C.

    1995-05-01

    This report is one in a series of 1994-1995 PVUSA reports that document PVUSA lessons learned at demonstration sites in California and Texas. During the last 7 years (1988 to 1994), 16 PV systems ranging from 20 kW to 500 kW have been installed. Six 20-kW emerging module technology (EMT) arrays and three turnkey (i.e., vendor designed and integrated) utility-scale systems were procured and installed at PVUSA's main test site in Davis, California. PVUSA host utilities have installed a total of seven EMT arrays and utility-scale systems in their service areas. Additional systems at Davis and host utility sites are planned. One of PVUSA's key objectives is to evaluate the performance, reliability, and cost of PV balance-of-system (BOS). In the procurement stage PVUSA encouraged innovative design to improve upon present practice by reducing maintenance, improving reliability, or lowering manufacturing or construction costs. The project team worked closely with suppliers during the design stage not only to ensure designs met functional and safety specifications, but to provide suggestions for improvement. This report, intended for the photovoltaic (PV) industry and for utility project managers and engineers considering PV plant construction and ownership, documents PVUSA utility-scale system design and cost lessons learned. Complementary PVUSA topical reports document: construction and safety experience; five-year assessment of EMTs; validation of the Kerman 500-kW grid-support PV plant benefits; PVUSA instrumentation and data analysis techniques; procurement, acceptance, and rating practices for PV power plants; experience with power conditioning units and power quality.

  5. Quantifying Construction Site Sediment Discharge Risk and Treatment Potential

    NASA Astrophysics Data System (ADS)

    Ferrell, L.; Beighley, R. E.

    2006-12-01

    Dealing with soil erosion and sediment transport can be a significant challenge during the construction process due to the potentially large spatial and temporal extent and conditions of bare soils. Best Management Practices (BMP) are commonly used to eliminate or reduce offsite discharge of sediment. However, few efforts have investigated the time varying risk of sediment discharge from construction sites, which often have dynamic soil conditions and the potential for less than optimal BMP installations. The goal of this research is to improve the design, implementation and effectiveness of sediment and erosion control at construction sites using site specific, temporal distributions of sediment discharge risk. Sediment risk is determined from individual factors leading to sediment expert, such as rainfall frequency, the adequacy of BMP installations, and the extent and duration of bare soil conditions. This research specifically focuses on quantifying: (a) the effectiveness of temporary sediment and control erosion control BMPs in preventing, containing, and/or treating construction site sediment discharge at varying levels of "proper" installation, and (b) sediment discharge potential from construction sites during different phases of construction, (ex., disturbed earth operations). BMPs are evaluated at selected construction sites in southern California and at the Soil Erosion Research Laboratory (SERL) in the Civil and Environmental Engineering department at San Diego State University. SERL experiments are performed on a 3-m by 10-m tilting soil bed with soil depths up to 1 meter, slopes ranging from 0 to 50 percent, and rainfall rates up to 150 mm/hr (6 in/hr). BMP performance is assessed based on experiments where BMPs are installed per manufacture specifications, potential less than optimal installations, and no treatment conditions. Soil conditions are also varied to represent site conditions during different phases of construction (i.e., loose lifts, stock piles, temporary roads, finished grade, others). Preliminary site monitoring, experimental results, and a conceptual model for estimating the time depend risk of sediment discharge over the duration of a construction project are presented.

  6. 10 CFR 73.55 - Requirements for physical protection of licensed activities in nuclear power reactors against...

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... sabotage vehicle bomb assault. (i) Land vehicles. Licensees shall: (A) Design, construct, install, and... fuel sabotage against the effects of the design basis threat of radiological sabotage land vehicle bomb...

  7. A case study : Michigan Intelligent Transportation System Center : use of a design/build/warranty contract

    DOT National Transportation Integrated Search

    2000-03-01

    Many ITS projects are stand-alone in nature, and do not have to be procured under rules for construction. The installation of field devices and communications infrastructure often meets the definition of construction. However, if a project involves t...

  8. 76 FR 29728 - Notice of Intent To Prepare an Environmental Impact Statement and Notice of Potential Floodplain...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-23

    ... 2.0 program would proceed through 2020 with design, construction, operation, and monitoring... of this test includes project definition, design, procurement, manufacture, installation, startup... the repowered oxy-combustion design. The station contains existing infrastructure that could support...

  9. Sequential Linker Installation: Precise Placement of Functional Groups in Multivariate Metal-Organic Frameworks

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Yuan, S; Lu, WG; Chen, YP

    2015-03-11

    A unique strategy, sequential linker installation (SLI), has been developed to construct multivariate MOFs with functional groups precisely positioned. PCN-700, a Zr-MOF with eight-connected Zr6O4(OH)(8)(H2O)(4) clusters, has been judiciously designed; the Zr-6 clusters in this MOF are arranged in such a fashion that, by replacement of terminal OH-/H2O ligands, subsequent insertion of linear dicarboxylate linkers is achieved. We demonstrate that linkers with distinct lengths and functionalities can be sequentially installed into PCN-700. Single-crystal to single-crystal transformation is realized so that the positions of the subsequently installed linkers are pinpointed via single-crystal X-ray diffraction analyses. This methodology provides a powerful toolmore » to construct multivariate MOFs with precisely positioned functionalities in the desired proximity, which would otherwise be difficult to achieve.« less

  10. 46 CFR 61.35-1 - General.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ..., DEPARTMENT OF HOMELAND SECURITY (CONTINUED) MARINE ENGINEERING PERIODIC TESTS AND INSPECTIONS Design Verification and Periodic Testing for Automatic Auxiliary Boilers § 61.35-1 General. (a) All automatic... equipment must be tested and inspected to verify their proper design, construction, installation, and...

  11. 40 CFR 280.22 - Notification requirements.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Section 280.22 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES... STORAGE TANKS (UST) UST Systems: Design, Construction, Installation and Notification § 280.22 Notification... to notify the designated state or local agency in accordance with the Hazardous and Solid Waste...

  12. 40 CFR 280.22 - Notification requirements.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Section 280.22 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES... STORAGE TANKS (UST) UST Systems: Design, Construction, Installation and Notification § 280.22 Notification... to notify the designated state or local agency in accordance with the Hazardous and Solid Waste...

  13. 40 CFR 280.22 - Notification requirements.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... Section 280.22 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES... STORAGE TANKS (UST) UST Systems: Design, Construction, Installation and Notification § 280.22 Notification... to notify the designated state or local agency in accordance with the Hazardous and Solid Waste...

  14. 40 CFR 280.22 - Notification requirements.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Section 280.22 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES... STORAGE TANKS (UST) UST Systems: Design, Construction, Installation and Notification § 280.22 Notification... to notify the designated state or local agency in accordance with the Hazardous and Solid Waste...

  15. 40 CFR 280.22 - Notification requirements.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... Section 280.22 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES... STORAGE TANKS (UST) UST Systems: Design, Construction, Installation and Notification § 280.22 Notification... to notify the designated state or local agency in accordance with the Hazardous and Solid Waste...

  16. A case study of the design, installation, and early performance of a nineteen-millimeter superpave mix.

    DOT National Transportation Integrated Search

    1999-07-01

    An attempt was made to design and construct a coarse matrix high binder (CMHB) mix. When the design of the CMHB mix was unsuccessful a coarse 19.0-mm Superpave mix was substituted. This report describes the attempted design of the CMHB mix, as well a...

  17. School Buses & Seat Belts: A Discussion.

    ERIC Educational Resources Information Center

    Alaska State Dept. of Education, Juneau.

    Safety belts are not installed in school buses for several reasons. School buses are constructed differently from automobiles in terms of (1) the locations of doors and instrument panels relative to passengers, (2) outer construction, (3) seat design and padding, and (4) visibility on the road. Under current regulations, bus seats are constructed…

  18. 10 CFR 73.55 - Requirements for physical protection of licensed activities in nuclear power reactors against...

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... shall: (i) Design, construct, install and maintain physical barriers as necessary to control access into.... (10) Vehicle control measures. Consistent with the physical protection program design requirements of... maintain vehicle control measures, as necessary, to protect against the design basis threat of radiological...

  19. 10 CFR 73.55 - Requirements for physical protection of licensed activities in nuclear power reactors against...

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... shall: (i) Design, construct, install and maintain physical barriers as necessary to control access into.... (10) Vehicle control measures. Consistent with the physical protection program design requirements of... maintain vehicle control measures, as necessary, to protect against the design basis threat of radiological...

  20. 10 CFR 73.55 - Requirements for physical protection of licensed activities in nuclear power reactors against...

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... shall: (i) Design, construct, install and maintain physical barriers as necessary to control access into.... (10) Vehicle control measures. Consistent with the physical protection program design requirements of... maintain vehicle control measures, as necessary, to protect against the design basis threat of radiological...

  1. Integrating Cost-effective Rollover Protective Structure Installation in High School Agricultural Mechanics: A Feasibility Study.

    PubMed

    Mazur, Joan; Vincent, Stacy; Watson, Jennifer; Westneat, Susan

    2015-01-01

    This study with three Appalachian county agricultural education programs examined the feasibility, effectiveness, and impact of integrating a cost-effective rollover protective structure (CROPS) project into high school agricultural mechanics classes. The project aimed to (1) reduce the exposure to tractor overturn hazards in three rural counties through the installation of CROPS on seven tractors within the Cumberland Plateau in the east region; (2) increase awareness in the targeted rural communities of cost-effective ROPS designs developed by the National Institution for Occupational Safety and Health (NIOSH) to encourage ROPS installations that decrease the costs of a retrofit; (3) test the feasibility of integration of CROPS construction and installations procedures into the required agricultural mechanics classes in these agricultural education programs; and (4) explore barriers to the implementation of this project in high school agricultural education programs. Eighty-two rural students and three agricultural educators participated in assembly and installation instruction. Data included hazard exposure demographic data, knowledge and awareness of CROPS plans, and pre-post knowledge of construction and assessment of final CROPS installation. Findings demonstrated the feasibility and utility of a CROPS education program in a professionally supervised secondary educational setting. The project promoted farm safety and awareness of availability and interest in the NIOSH Cost-effective ROPS plans. Seven CROPS were constructed and installed. New curriculum and knowledge measures also resulted from the work. Lessons learned and recommendations for a phase 2 implementation and further research are included.

  2. Key issues for low-cost FGD installations

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    DePriest, W.; Mazurek, J.M.

    1995-12-01

    This paper will discuss various methods for installing low-cost FGD systems. The paper will include a discussion of various types of FGD systems available, both wet and dry, and will compare the relative cost of each type. Important design issues, such as use of spare equipment, materials of construction, etc. will be presented. An overview of various low-cost construction techniques (i.e., modularization) will be included. This paper will draw heavily from Sargent & Lundy`s database of past and current FGD projects together with information we gathered for several Electric Power Research Institute (EPRI) studies on the subject.

  3. Feasibility, Design and Construction of a Small Hydroelectric Power Generation Station as a Student Design Project.

    ERIC Educational Resources Information Center

    Peterson, James N.; Hess, Herbert L.

    An undergraduate capstone engineering design project now provides hydroelectric power to a remote wilderness location. Students investigated the feasibility of designing, building, and installing a 4kW hydroelectric system to satisfy the need for electric power to support the research and teaching functions of Taylor Ranch, a university facility…

  4. A step-by-step introduction to rule-based design of synthetic genetic constructs using GenoCAD.

    PubMed

    Wilson, Mandy L; Hertzberg, Russell; Adam, Laura; Peccoud, Jean

    2011-01-01

    GenoCAD is an open source web-based system that provides a streamlined, rule-driven process for designing genetic sequences. GenoCAD provides a graphical interface that allows users to design sequences consistent with formalized design strategies specific to a domain, organization, or project. Design strategies include limited sets of user-defined parts and rules indicating how these parts are to be combined in genetic constructs. In addition to reducing design time to minutes, GenoCAD improves the quality and reliability of the finished sequence by ensuring that the designs follow established rules of sequence construction. GenoCAD.org is a publicly available instance of GenoCAD that can be found at www.genocad.org. The source code and latest build are available from SourceForge to allow advanced users to install and customize GenoCAD for their unique needs. This chapter focuses primarily on how the GenoCAD tools can be used to organize genetic parts into customized personal libraries, then how these libraries can be used to design sequences. In addition, GenoCAD's parts management system and search capabilities are described in detail. Instructions are provided for installing a local instance of GenoCAD on a server. Some of the future enhancements of this rapidly evolving suite of applications are briefly described. Copyright © 2011 Elsevier Inc. All rights reserved.

  5. 40 CFR 146.22 - Construction requirements.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... caliper logs before casing is installed; and (B) A cement bond, temperature, or density log after the...; and (C) A cement bond, temperature, or density log after the casing is set and cemented. (g) At a... drinking water. The casing and cement used in the construction of each newly drilled well shall be designed...

  6. Landscape Gardener: Apprenticeship Course Outline. Apprenticeship and Industry Training. 4711.1

    ERIC Educational Resources Information Center

    Alberta Advanced Education and Technology, 2011

    2011-01-01

    The graduate of the Landscape Gardener apprenticeship program is a certified journeyperson who will be able: (1) apply the principles and processes of landscape design and construction; (2) construct and install landscape structures and other accessories of various materials; (3) estimate and handle orders of plant and related materials; (4) plan…

  7. 77 FR 14584 - Notice of Passenger Facility Charge (PFC) Approvals and Disapprovals

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-12

    ... square yards). Modify supplemental wind cones. Runway 8/26 pavement rejuvenation. Purchase snow removal equipment--high-speed snow plow. Master plan/land use. Design passenger terminal remodel. Install runway... lighting and cable rehabilitation. Construct improvements of terminal building. Design reconstruction of...

  8. Methodical foundations of the preparation of highly valued personnel for high-rise construction

    NASA Astrophysics Data System (ADS)

    Belyaeva, Svetlana; Belyantseva, Oksana; Safonova, Nataliya; Vasilyeva, Olga

    2018-03-01

    When carrying out design and survey and construction and installation works for such an innovative type of activity as high-rise construction, the problem of personnel qualification becomes urgent. The article poses a research problem, identifies the main reasons for the need for training highly qualified specialists in construction, and suggests areas for improving training. The expediency of development of mentoring system was proved, the corresponding model of interaction between educational institutions and construction enterprises was offered, key interaction effects were evaluated.

  9. Design and construction of the X-2 two-stage free piston driven expansion tube

    NASA Technical Reports Server (NTRS)

    Doolan, Con

    1995-01-01

    This report outlines the design and construction of the X-2 two-stage free piston driven expansion tube. The project has completed its construction phase and the facility has been installed in the new impulsive research laboratory where commissioning is about to take place. The X-2 uses a unique, two-stage driver design which allows a more compact and lower overall cost free piston compressor. The new facility has been constructed in order to examine the performance envelope of the two-stage driver and how well it couple to sub-orbital and super-orbital expansion tubes. Data obtained from these experiments will be used for the design of a much larger facility, X-3, utilizing the same free piston driver concept.

  10. (Environmental investigation of ground water contamination at Wright-Patterson Air Force Base, Ohio)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1992-04-01

    This Removal Action System Design has been prepared as a Phase I Volume for the implementation of the Phase II removal action at Wright-Patterson Air Force Base (WPAFB) near Dayton, Ohio. The objective of the removal action is to prevent, to the extent practicable, the migration of ground water contaminated with chlorinated volatile organic compounds (VOCS) across the southwest boundary of Area C. The Phase 1, Volume 9 Removal Action System Design compiles the design documents prepared for the Phase II Removal Action. These documents, which are presented in Appendices to Volume 9, include: Process Design, which presents the 30more » percent design for the ground water treatment system (GWTS); Design Packages 1 and 2 for Earthwork and Road Construction, and the Discharge Pipeline, respectively; no drawings are included in the appendix; Design Package 3 for installation of the Ground Water Extraction Well(s); Design Package 4 for installation of the Monitoring Well Instrumentation; and Design Package 5 for installation of the Ground Water Treatment System; this Design Package is incorporated by reference because of its size.« less

  11. DESIGNING AN OPPORTUNITY FUEL WITH BIOMASS AND TIRE-DERIVED FUEL FOR COFIRING AT WILLOW ISLAND GENERATING STATION AND COFIRING SAWDUST WITH COAL AT ALBRIGHT GENERATING STATION

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    K. Payette; D. Tillman

    During the period July 1, 2001--September 30, 2001, Allegheny Energy Supply Co., LLC (Allegheny) continued construction of the Willow Island cofiring project, completed the installation of the fuel storage facility, the fuel receiving facility, and the processing building. All mechanical equipment has been installed and electrical construction has proceeded. During this time period significant short term testing of the Albright Generating Station cofiring facility was completed, and the 100-hour test was planned for early October. The testing demonstrated that cofiring at the Albright Generating Station could contribute to a ''4P Strategy''--reduction of SO{sub 2}, NO{sub x}, mercury, and greenhouse gasmore » emissions. This report summarizes the activities associated with the Designer Opportunity Fuel program, and demonstrations at Willow Island and Albright Generating Stations. It details the construction activities at both sites along with the combustion modeling at the Willow Island site.« less

  12. 75 FR 65551 - Notice of Passenger Facility Charge (PFC) Approvals and Disapprovals

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-25

    ... at a $3.00 PFC Level: New terminal development schematic preliminary engineering study and design... for Collection and Use: Air carrier apron. Pavement condition inventory. New terminal building... construction. De-icing treatment plant. Domestic water service. CTX design and installation. Landside planning...

  13. TU-H-BRA-07: Design, Construction, and Installation of An Experimental Beam Line for the Development of MRI-Linac Compatible Electron Accelerator

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Whelan, B; Keall, P; Holloway, L

    Purpose: MRI guided radiation therapy (MRIgRT) is a rapidly growing field; however, Linac operation in MRI fringe fields represents an ongoing challenge. We have previously shown in-silico that Linacs could be redesigned to function in the in-line orientation with no magnetic shielding by adopting an RF-gun configuration. Other authors have also published insilico studies of Linac operation in magnetic fields; however to date no experimental validation data is published. This work details the design, construction, and installation of an experimental beam line to validate our in-silico results. Methods: An RF-gun comprising 1.5 accelerating cells and capable of generating electron energiesmore » up to 3.2MeV is used. The experimental apparatus was designed to monitor both beam current (toroid current monitor), spot size (two phosphor screens with viewports), and generate peak magnetic fields of at least 1000G (three variable current electromagnetic coils). Thermal FEM simulations were developed to ensure coil temperature remained within 100degC. Other design considerations included beam disposal, vacuum maintenance, radiation shielding, earthquake safety, and machine protection interlocks. Results: The beam line has been designed, built, and installed in a radiation shielded bunker. Water cooling, power supplies, thermo-couples, cameras, and radiation shielding have been successfully connected and tested. Interlock testing, vacuum processing, and RF processing have been successfully completed. The first beam on is expected within weeks. The coil heating simulations show that with care, peak fields of up to 1200G (320G at cathode) can be produced using 40A current, which is well within the fields expected for MRI-Linac systems. The maximum coil temperature at this current was 84degC after 6 minutes. Conclusion: An experimental beam line has been constructed and installed at SLAC in order to experimentally characterise RF gun performance in in-line magnetic fields, validate in-silico design work, and provide the first published experimental data relating to accelerator functionality for MRIgRT.« less

  14. Solar heating and cooling system design and development

    NASA Technical Reports Server (NTRS)

    1978-01-01

    The progress of the program during the sixth program quarter is reported. The program calls for the development and delivery of eight prototype solar heating and cooling systems for installation and operational test. The William O'Brien single-family heating system was installed and is operational. The New Castle single-family heating residence is under construction. The Kansas University (KU) system is in the final design stages. The 25 ton cooling subsystem for KU is the debugging stage. Pressure drops that were greater than anticipated were encountered. The 3 ton simulation work is being finalized and the design parameters for the Rankine system were determined from simulation output.

  15. New technique for installing screen wicking into Inconel 718 heat pipe

    NASA Astrophysics Data System (ADS)

    Giriunas, Julius A.; Watson, Gordon K.; Tower, Leonard K.

    1993-01-01

    The creep behavior of superalloys, including Inconel 718, in the presence of liquid sodium is not yet known. To study this problem, the NASA Lewis Research Center has initiated a program with the Energy Technology Engineering Center (ETEC) of Rockwell International Corporation to fill with sodium and creep-test three small cylindrical heat pipes of Inconel 718 for a period of 1000 hours each. This report documents the design and the construction methods that were used at NASA Lewis to fabricate these heat pipes. Of particular importance in the heat pipe construction was the installation of the screen wicking by using an expandable mandrel and differential thermal expansion. This installation technique differs from anything known to have been reported in the heat pipe literature and may be of interest to other workers in the heat pipe field.

  16. The AP1000{sup R} China projects move forward to construction completion and equipment installation

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Harrop, G.

    2012-07-01

    The AP1000 design is the only Generation III+ technology to receive design certification from the U.S. Nuclear Regulatory Commission. This evolutionary design provides the highest safety and performance standards and has several distinct advantages over other designs, including improved operations and reduced construction schedule risks through the use of modern, modular, engineering principles that allow construction and fabrication tasks traditionally performed in sequence to be undertaken in parallel. Since the first granting of Design Certification in 2005 by the NRC, the AP1000 design has been modified to meet emergent NRC requirements such as those requiring the design to withstand themore » impact of an aircraft crash. Both domestic and foreign utilities have turned to the Westinghouse AP1000 plant design to meet their near - and long-term sustainable energy needs. The first ever deployment of this advanced U.S. nuclear power technology began in China in 2007 with the award of a contract to build four AP1000 units, constructed in pairs at the coastal sites of Sanmen (Zhejiang Province) and Haiyang (Shandong Province). Currently, all four units are at an advanced stage of construction. The commercial operation date for Sanmen Unit 1 is November 2013 followed by Haiyang Unit 1 being operational in May 2014. Construction and equipment manufacture is at an advanced stage. Sanmen Unit 1 equipment that has been delivered includes the reactor vessel, the reactor vessel closure head, the passive residual heat removal heat exchanger, the integrated head package, the polar crane, and the refueling machine. The steam generators are also completed. The RV was installed within the containment vessel building in September 2011. The installation of this major equipment will allow the setting of the containment vessel top head. Haiyang Unit 1 is also achieving significant progress. Significant benefits continue to be realized as a result of lessons learned and experience gained from the first-of-a-kind activities for Sanmen Unit 1 and AP1000 equipment design and manufacturing. For example, the nuclear island basemat at Haiyang Units 1 and 2 and Sanmen Unit 2 was laid in less time than that of Sanmen Unit 1, the ultra-large steam generator and RV forging lead times were reduced for the follow on units, and the fabrication of the auxiliary building module for Haiyang Unit 1 took less time than for the Sanmen first unit. These benefits are also being realized by the United States AP1000 project construction and fabrication modules, and equipment. Some difficulties arise from building this first-of-a-kind (advanced passive) type of plant; however, these difficulties are being overcome and the overall schedule remains achievable. (authors)« less

  17. 46 CFR 162.161-5 - Instruction manual for design, installation, operation, and maintenance.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... (CONTINUED) EQUIPMENT, CONSTRUCTION, AND MATERIALS: SPECIFICATIONS AND APPROVAL ENGINEERING EQUIPMENT Fixed... for halocarbon systems and UL 2127 for inert gas systems; (3) Identification of the computer program...

  18. 46 CFR 162.161-5 - Instruction manual for design, installation, operation, and maintenance.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... (CONTINUED) EQUIPMENT, CONSTRUCTION, AND MATERIALS: SPECIFICATIONS AND APPROVAL ENGINEERING EQUIPMENT Fixed... for halocarbon systems and UL 2127 for inert gas systems; (3) Identification of the computer program...

  19. QA program plan plutonium stabilization and handling project W-460

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    SCHULTZ, J.W.

    This Quality Assurance Program Plan (QAPP) identifies Project Quality Assurance (QA) program requirements for all parties participating in the design, procurement, demolition, construction, installation, inspection and testing for Project W-460.

  20. 49 CFR 193.2005 - Applicability.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Transportation Other Regulations Relating to Transportation (Continued) PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) PIPELINE SAFETY LIQUEFIED NATURAL GAS FACILITIES..., design, installation, or construction of LNG facilities (including material incorporated by reference in...

  1. STS-98 payload U.S. Lab Destiny is moved into Atlantis' payload bay

    NASA Technical Reports Server (NTRS)

    2001-01-01

    KENNEDY SPACE CENTER, Fla. -- The U.S. Lab Destiny is ready to move into the orbiter'''s payload bay from the Payload Changeout Room. The PCR is the enclosed, environmentally controlled portion of the rotating service structure that supports payload delivery at the launch pad and vertical installation in the orbiter payload bay. Destiny, a key element in the construction of the International Space Station is designed for space science experiments and already has five system racks installed inside. STS-98 is the seventh construction flight to the ISS. Launch of STS-98 is scheduled for Jan. 19 at 2:11 a.m. EST.

  2. STS-98 payload U.S. Lab Destiny is moved into Atlantis' payload bay

    NASA Technical Reports Server (NTRS)

    2001-01-01

    KENNEDY SPACE CENTER, Fla. -- Technicians in the Payload Changeout Room oversee the transfer of the U.S. Lab Destiny to the orbiter'''s payload bay. The PCR is the enclosed, environmentally controlled portion of the rotating service structure that supports payload delivery at the launch pad and vertical installation in the orbiter payload bay. Destiny, a key element in the construction of the International Space Station is designed for space science experiments and already has five system racks installed inside. STS-98 is the seventh construction flight to the ISS. Launch of STS-98 is scheduled for Jan. 19 at 2:11 a.m. EST.

  3. Constance mirror program: Progress and plans

    NASA Technical Reports Server (NTRS)

    Klinkowstein, R. E.; Mauel, M. E.; Irby, J. H.; Smullin, L. D.; Voldman, S. H.

    1981-01-01

    The current state of the mechanics of the Constance II experiment, the physics results gathered, the motivation background, and future plans for the Constance II experiment are reviewed. Several improvements have been made and several experimental investigations have been completed. These include the construction/installation/testing of: (1) liquid-nitrogen cooled, Ioffe bars installed, (2) a diverter coil (3) the 100 kW ICRF generator, (4) the data acquisition system, and (5) the optimum hot-iron operation of the machine with Titanium and pulsed-gas plasma guns. Measurements were made of the density, temperature, and radius of the plasma. Ion-cyclotron fluctuations were observed, their bandwidth measured, and data collected demonstrating resonance heating. New X-ray diagnostics were designed and purchased, and progress on the Thomson scattering was made. Finally, a new hot cathode gun was designed and constructed.

  4. 29 CFR 1926.152 - Flammable liquids.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... tank, unless control valves and their connections to the tank are of a type designed to prevent... storage cabinets shall be constructed in the following manner, or equivalent: The bottom, sides, and top... extinguishing system is provided, the system shall be designed and installed in an approved manner. Openings to...

  5. 29 CFR 1926.152 - Flammable liquids.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... tank, unless control valves and their connections to the tank are of a type designed to prevent... storage cabinets shall be constructed in the following manner, or equivalent: The bottom, sides, and top... extinguishing system is provided, the system shall be designed and installed in an approved manner. Openings to...

  6. 14 CFR 25.685 - Control system details.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 14 Aeronautics and Space 1 2013-01-01 2013-01-01 false Control system details. 25.685 Section 25... AIRWORTHINESS STANDARDS: TRANSPORT CATEGORY AIRPLANES Design and Construction Control Systems § 25.685 Control system details. (a) Each detail of each control system must be designed and installed to prevent jamming...

  7. 14 CFR 25.685 - Control system details.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... AIRWORTHINESS STANDARDS: TRANSPORT CATEGORY AIRPLANES Design and Construction Control Systems § 25.685 Control system details. (a) Each detail of each control system must be designed and installed to prevent jamming... 14 Aeronautics and Space 1 2014-01-01 2014-01-01 false Control system details. 25.685 Section 25...

  8. 14 CFR 25.685 - Control system details.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... AIRWORTHINESS STANDARDS: TRANSPORT CATEGORY AIRPLANES Design and Construction Control Systems § 25.685 Control system details. (a) Each detail of each control system must be designed and installed to prevent jamming... 14 Aeronautics and Space 1 2011-01-01 2011-01-01 false Control system details. 25.685 Section 25...

  9. 14 CFR 25.685 - Control system details.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... AIRWORTHINESS STANDARDS: TRANSPORT CATEGORY AIRPLANES Design and Construction Control Systems § 25.685 Control system details. (a) Each detail of each control system must be designed and installed to prevent jamming... 14 Aeronautics and Space 1 2010-01-01 2010-01-01 false Control system details. 25.685 Section 25...

  10. 14 CFR 25.685 - Control system details.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... AIRWORTHINESS STANDARDS: TRANSPORT CATEGORY AIRPLANES Design and Construction Control Systems § 25.685 Control system details. (a) Each detail of each control system must be designed and installed to prevent jamming... 14 Aeronautics and Space 1 2012-01-01 2012-01-01 false Control system details. 25.685 Section 25...

  11. Holes Creek, Water Resources Development. Volume I. Main Report and Environmental Impact Statement.

    DTIC Science & Technology

    1980-09-01

    Miami River also cause problems on the lower reaches of both creeks. The Miami Conservancy District has constructed levees along the Miami River to...design concepts to reduce adverse impacts to fish and wildlife habitat. These concepts include the construction of a low flow channel, installation of...pools and riffles, preservation of a small woodlot, and in certain areas restricting construction to one bank only. The remaining detrimental impacts are

  12. [Environmental investigation of ground water contamination at Wright-Patterson Air Force Base, Ohio]. Volume 9, Removal action system design

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1992-04-01

    This Removal Action System Design has been prepared as a Phase I Volume for the implementation of the Phase II removal action at Wright-Patterson Air Force Base (WPAFB) near Dayton, Ohio. The objective of the removal action is to prevent, to the extent practicable, the migration of ground water contaminated with chlorinated volatile organic compounds (VOCS) across the southwest boundary of Area C. The Phase 1, Volume 9 Removal Action System Design compiles the design documents prepared for the Phase II Removal Action. These documents, which are presented in Appendices to Volume 9, include: Process Design, which presents the 30more » percent design for the ground water treatment system (GWTS); Design Packages 1 and 2 for Earthwork and Road Construction, and the Discharge Pipeline, respectively; no drawings are included in the appendix; Design Package 3 for installation of the Ground Water Extraction Well(s); Design Package 4 for installation of the Monitoring Well Instrumentation; and Design Package 5 for installation of the Ground Water Treatment System; this Design Package is incorporated by reference because of its size.« less

  13. 21 CFR 1250.30 - Construction, maintenance and use of places where food is prepared, served, or stored.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... designed, installed, and maintained as to prevent contamination of the water supply, food, and food... 21 Food and Drugs 8 2010-04-01 2010-04-01 false Construction, maintenance and use of places where food is prepared, served, or stored. 1250.30 Section 1250.30 Food and Drugs FOOD AND DRUG...

  14. Field performance of timber bridges. 11, Spearfish Creek stress-laminated box-beam bridge

    Treesearch

    J. P. Wacker; M. A. Ritter; K. Stanfill-McMillan

    The Spearfish Creek bridge was constructed in 1992 in Spearfish, South Dakota. It is a single-span, stress-laminated, box-beam superstructure. Performance of the bridge is being monitored for 5 years, beginning at installation. This report summarizes results for the first 3-1/2 years of monitoring and includes information on the design, construction, and field...

  15. Construction and performance of rugged ceramic cup soil water samplers

    Treesearch

    Douglas M. Stone; James L. Robl

    1996-01-01

    To assess solute concentration changes associated with soil compaction and organic matter removal resulting from forest harvesting, we constructed and field tested ceramic cup soil water samplers designed to withstand the forces of compaction by heavy equipment. They were installed with the cup at either the 30-or 60-cm depth; the vacuum and collection tubes rested on...

  16. Communication Network Design: West Ottawa School District.

    ERIC Educational Resources Information Center

    Couch, David deS.

    This report describes the technical details and rationale behind the decisions in the design and development of the communications network installed as part of a 1991-1993 district-wide construction project in the West Ottawa Public Schools (Michigan). The project called for development of a communications network to carry voice, data, and video…

  17. Analysis of the Earthquake Impact towards water-based fire extinguishing system

    NASA Astrophysics Data System (ADS)

    Lee, J.; Hur, M.; Lee, K.

    2015-09-01

    Recently, extinguishing system installed in the building when the earthquake occurred at a separate performance requirements. Before the building collapsed during the earthquake, as a function to maintain a fire extinguishing. In particular, the automatic sprinkler fire extinguishing equipment, such as after a massive earthquake without damage to piping also must maintain confidentiality. In this study, an experiment installed in the building during the earthquake, the water-based fire extinguishing saw grasp the impact of the pipe. Experimental structures for water-based fire extinguishing seismic construction step by step, and then applied to the seismic experiment, the building appears in the extinguishing of the earthquake response of the pipe was measured. Construction of acceleration caused by vibration being added to the size and the size of the displacement is measured and compared with the data response of the pipe from the table, thereby extinguishing water piping need to enhance the seismic analysis. Define the seismic design category (SDC) for the four groups in the building structure with seismic criteria (KBC2009) designed according to the importance of the group and earthquake seismic intensity. The event of a real earthquake seismic analysis of Category A and Category B for the seismic design of buildings, the current fire-fighting facilities could have also determined that the seismic performance. In the case of seismic design categories C and D are installed in buildings to preserve the function of extinguishing the required level of seismic retrofit design is determined.

  18. Phase I development of an aesthetic, precast concrete bridge rail.

    DOT National Transportation Integrated Search

    2012-02-01

    Precast concrete bridge rail systems offer several advantages over traditional cast-in-place rail designs, including reduced construction : time and costs, installation in a wide range of environmental conditions, easier maintenance and repair, impro...

  19. Heating and Cooling from the Ground Up.

    ERIC Educational Resources Information Center

    Jackson, Lisa M.

    1998-01-01

    Explains why converting to geothermal heating and cooling is a good option when constructing or retrofitting schools. Reasons discussed include competitive installation costs, lower operating and maintenance costs, greater building-design flexibility, and greater user satisfaction. (GR)

  20. Technical Competencies Applied in Experimental Fluid Dynamics

    NASA Astrophysics Data System (ADS)

    Tagg, Randall

    2017-11-01

    The practical design, construction, and operation of fluid dynamics experiments require a broad range of competencies. Three types are instrumental, procedural, and design. Respective examples would be operation of a spectrum analyzer, soft-soldering or brazing flow plumbing, and design of a small wind tunnel. Some competencies, such as the selection and installation of pumping systems, are unique to fluid dynamics and fluids engineering. Others, such as the design and construction of electronic amplifiers or optical imaging systems, overlap with other fields. Thus the identification and development of learning materials and methods for instruction are part of a larger effort to identify competencies needed in active research and technical innovation.

  1. STS-98 payload U.S. Lab Destiny is moved into Atlantis' payload bay

    NASA Technical Reports Server (NTRS)

    2001-01-01

    KENNEDY SPACE CENTER, Fla. -- Workers in the Payload Changeout Room check the movement of the U.S. Lab Destiny, which is being transferred to the orbiter'''s payload bay. The PCR is the enclosed, environmentally controlled portion of the rotating service structure that supports payload delivery at the launch pad and vertical installation in the orbiter payload bay. Destiny, a key element in the construction of the International Space Station is designed for space science experiments and already has five system racks installed inside. STS-98 is the seventh construction flight to the ISS. Launch of STS-98 is scheduled for Jan. 19 at 2:11 a.m. EST.

  2. Design and Construction of Foundations in Areas of Deep Seasonal Frost and Permafrost.

    DTIC Science & Technology

    1980-08-01

    soils later, during or following construction such as from roof drains, dry wells or condensate discharge, must be considered. e b. Construction when...thermal damage unless carefully controlled. Condensation of ice crystals in the ducts from moist air may also block the ventilating ducts if they are...guidance is available when needed. If 2 8mpers are installed they should be placed on the upwind side .Eliminating downwind dampers allows convection

  3. 42 CFR 84.196 - Harnesses; installation and construction; minimum requirements.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 42 Public Health 1 2010-10-01 2010-10-01 false Harnesses; installation and construction; minimum... SERVICES OCCUPATIONAL SAFETY AND HEALTH RESEARCH AND RELATED ACTIVITIES APPROVAL OF RESPIRATORY PROTECTIVE DEVICES Chemical Cartridge Respirators § 84.196 Harnesses; installation and construction; minimum...

  4. Transport and installation of the Dark Energy Survey CCD imager

    NASA Astrophysics Data System (ADS)

    Derylo, Greg; Chi, Edward; Diehl, H. Thomas; Estrada, Juan; Flaugher, Brenna; Schultz, Ken

    2012-09-01

    The Dark Energy Survey CCD imager was constructed at the Fermi National Accelerator Laboratory and delivered to the Cerro Tololo Inter-American Observatory in Chile for installation onto the Blanco 4m telescope. Several efforts are described relating to preparation of the instrument for transport, development and testing of a shipping crate designed to minimize transportation loads transmitted to the camera, and inspection of the imager upon arrival at the observatory. Transportation loads were monitored and are described. For installation of the imager at the telescope prime focus, where it mates with its previously-installed optical corrector, specialized tooling was developed to safely lift, support, and position the vessel. The installation and removal processes were tested on the Telescope Simulator mockup at FNAL, thus minimizing technical and schedule risk for the work performed at CTIO. Final installation of the imager is scheduled for August 2012.

  5. Energy Storage System Safety: Plan Review and Inspection Checklist

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Cole, Pam C.; Conover, David R.

    Codes, standards, and regulations (CSR) governing the design, construction, installation, commissioning, and operation of the built environment are intended to protect the public health, safety, and welfare. While these documents change over time to address new technology and new safety challenges, there is generally some lag time between the introduction of a technology into the market and the time it is specifically covered in model codes and standards developed in the voluntary sector. After their development, there is also a timeframe of at least a year or two until the codes and standards are adopted. Until existing model codes andmore » standards are updated or new ones are developed and then adopted, one seeking to deploy energy storage technologies or needing to verify the safety of an installation may be challenged in trying to apply currently implemented CSRs to an energy storage system (ESS). The Energy Storage System Guide for Compliance with Safety Codes and Standards1 (CG), developed in June 2016, is intended to help address the acceptability of the design and construction of stationary ESSs, their component parts, and the siting, installation, commissioning, operations, maintenance, and repair/renovation of ESS within the built environment.« less

  6. 42 CFR 84.133 - Harnesses; installation and construction; minimum requirements.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 42 Public Health 1 2010-10-01 2010-10-01 false Harnesses; installation and construction; minimum... SERVICES OCCUPATIONAL SAFETY AND HEALTH RESEARCH AND RELATED ACTIVITIES APPROVAL OF RESPIRATORY PROTECTIVE DEVICES Supplied-Air Respirators § 84.133 Harnesses; installation and construction; minimum requirements...

  7. Solar heating system installed at Blakedale Professional Center, Greenwood, South Carolina

    NASA Technical Reports Server (NTRS)

    1980-01-01

    Information on the solar heating system installed at the Blakedale Professional Center, in Greenwood, South Carolina is presented. The information consists of site and building description, solar system description, performance evaluation, system problems and installation drawings. The solar system was designed to provide approximately 85 percent of the building's heating requirements. The system was installed concurrently with building construction and heats 4,440 square feet of the building. There are 954 square feet of liquid flat plate collectors that are proof-mounted and have a drain-down system to protect the collectors from freezing. A 5,000 gallon steel, polyurethane insulated tank buried underground provides storage. The system was fully instrumented for performance evaluation and integrated into the National Solar Data Network.

  8. 10 CFR 32.61 - Ice detection devices containing strontium-90; requirements for license to manufacture or...

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... physical form and maximum quantity of strontium-90 in the device; (2) Details of construction and design of... handling and installation of the device; (8) Any additional information, including experimental studies and... ordinary circumstances of use; (3) The device is so designed that it cannot be easily disassembled; (4) The...

  9. Establishment of a National Accelerator Facility: Design and construction phase

    NASA Astrophysics Data System (ADS)

    1981-06-01

    The main components of an accelerator facility for nuclear physics, isotope production, and radiotherapy in South Africa are in 8-MeV solid pole injector cyclotron and a separated sector cyclotron with a k-value of 200 MeV. Progress made in the development of the light ion injector and in the design of the control and beam transport systems is described. Mechanical and engineering tasks associated with component manufacture are discussed as well as the construction of the building to house the facility and the installation of necessary services.

  10. 23 CFR 630.1002 - Purpose.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... mobility of road users and highway workers. These safety and mobility impacts are exacerbated by an aging... prescribes standards for the design, application, installation, and maintenance of traffic control devices for highway and street construction, maintenance operation, and utility work. In addition to the...

  11. 29 CFR 1926.404 - Wiring design and protection.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... tracks of electrically operated cranes; frames of nonelectrically driven elevator cars to which electric..., DEPARTMENT OF LABOR (CONTINUED) SAFETY AND HEALTH REGULATIONS FOR CONSTRUCTION Electrical Installation Safety... conductors, transformers, or other electric equipment, unless such equipment is controlled by a disconnecting...

  12. 29 CFR 1926.404 - Wiring design and protection.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... tracks of electrically operated cranes; frames of nonelectrically driven elevator cars to which electric..., DEPARTMENT OF LABOR (CONTINUED) SAFETY AND HEALTH REGULATIONS FOR CONSTRUCTION Electrical Installation Safety... conductors, transformers, or other electric equipment, unless such equipment is controlled by a disconnecting...

  13. 7 CFR 58.807 - General construction, repair and installation.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... Section 58.807 Agriculture Regulations of the Department of Agriculture (Continued) AGRICULTURAL MARKETING... AND STANDARDS UNDER THE AGRICULTURAL MARKETING ACT OF 1946 AND THE EGG PRODUCTS INSPECTION ACT... sanitary design principles, except where engineering requirements preclude strict adherence to such...

  14. 7 CFR 58.807 - General construction, repair and installation.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... Section 58.807 Agriculture Regulations of the Department of Agriculture (Continued) AGRICULTURAL MARKETING... AND STANDARDS UNDER THE AGRICULTURAL MARKETING ACT OF 1946 AND THE EGG PRODUCTS INSPECTION ACT... sanitary design principles, except where engineering requirements preclude strict adherence to such...

  15. 7 CFR 58.807 - General construction, repair and installation.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... Section 58.807 Agriculture Regulations of the Department of Agriculture (Continued) AGRICULTURAL MARKETING... AND STANDARDS UNDER THE AGRICULTURAL MARKETING ACT OF 1946 AND THE EGG PRODUCTS INSPECTION ACT... sanitary design principles, except where engineering requirements preclude strict adherence to such...

  16. The Meteor Meter.

    ERIC Educational Resources Information Center

    Eggensperger, Martin B.

    2000-01-01

    Introduces the Meteor Scatter Project (MSP) in which high school students build an automated meteor observatory and learn to monitor meteor activity. Involves students in activities such as radio frequency survey, antenna design, antenna construction, manual meteor counts, and computer board configuration and installation. (YDS)

  17. 23 CFR 924.11 - Implementation.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ..., where applicable, for highway construction projects, 23 CFR part 172 for engineering and design services..., pavement markings, or installation of traffic signs, traffic lights, guardrails, impact attenuators... may amount up to 100 percent for projects for signing, pavement markings, active warning devices, and...

  18. 23 CFR 924.11 - Implementation.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ..., where applicable, for highway construction projects, 23 CFR part 172 for engineering and design services..., pavement markings, or installation of traffic signs, traffic lights, guardrails, impact attenuators... may amount up to 100 percent for projects for signing, pavement markings, active warning devices, and...

  19. 23 CFR 924.11 - Implementation.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ..., where applicable, for highway construction projects, 23 CFR part 172 for engineering and design services..., pavement markings, or installation of traffic signs, traffic lights, guardrails, impact attenuators... may amount up to 100 percent for projects for signing, pavement markings, active warning devices, and...

  20. 23 CFR 924.11 - Implementation.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ..., where applicable, for highway construction projects, 23 CFR part 172 for engineering and design services..., pavement markings, or installation of traffic signs, traffic lights, guardrails, impact attenuators... may amount up to 100 percent for projects for signing, pavement markings, active warning devices, and...

  1. 23 CFR 924.11 - Implementation.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ..., where applicable, for highway construction projects, 23 CFR part 172 for engineering and design services..., pavement markings, or installation of traffic signs, traffic lights, guardrails, impact attenuators... may amount up to 100 percent for projects for signing, pavement markings, active warning devices, and...

  2. Laboratory Equipment Criteria.

    ERIC Educational Resources Information Center

    State Univ. Construction Fund, Albany, NY.

    Requirements for planning, designing, constructing and installing laboratory furniture are given in conjunction with establishing facility criteria for housing laboratory equipment. Furniture and equipment described include--(1) center tables, (2) reagent racks, (3) laboratory benches and their mechanical fixtures, (4) sink and work counters, (5)…

  3. Radioactive air emissions notice of construction for installation and operation of a waste retrieval system and tanks 241-AP-102 and 241-AP-104 project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    DEXTER, M.L.

    1999-11-15

    This document serves as a notice of construction (NOC) pursuant to the requirements of Washington Administrative Code (WAC) 246 247-060, and as a request for approval to modify pursuant to 40 Code of Federal Regulations (CFR) 61 07 for the installation and operation of one waste retrieval system in the 24 1 AP-102 Tank and one waste retrieval system in the 241 AP 104 Tank Pursuant to 40 CFR 61 09 (a)( 1) this application is also intended to provide anticipated initial start up notification Its is requested that EPA approval of this application will also constitute EPA acceptance ofmore » the initial start up notification Project W 211 Initial Tank Retrieval Systems (ITRS) is scoped to install a waste retrieval system in the following double-shell tanks 241-AP 102-AP 104 AN 102, AN 103, AN-104, AN 105, AY 102 AZ 102 and SY-102 between now and the year 2011. Because of the extended installation schedules and unknowns about specific activities/designs at each tank, it was decided to submit NOCs as that information became available This NOC covers the installation and operation of a waste retrieval system in tanks 241 AP-102 and 241 AP 104 Generally this includes removal of existing equipment installation of new equipment and construction of new ancillary equipment and buildings Tanks 241 AP 102 and 241 AP 104 will provide waste feed for immobilization into a low activity waste (LAW) product (i.e. glass logs) The total effective dose equivalent (TEDE) to the offsite maximally exposed individual (MEI) from the construction activities is 0 045 millirem per year The unabated TEDE to the offsite ME1 from operation of the mixer pumps is 0 042 millirem per year.« less

  4. A Quasi-Experimental Study Analyzing the Effectiveness of Portable High-Efficiency Particulate Absorption Filters in Preventing Infections in Hematology Patients during Construction

    PubMed Central

    Özen, Mehmet; Yılmaz, Gülden; Coşkun, Belgin; Topçuoğlu, Pervin; Öztürk, Bengi; Gündüz, Mehmet; Atilla, Erden; Arslan, Önder; Özcan, Muhit; Demirer, Taner; İlhan, Osman; Konuk, Nahide; Balık, İsmail; Gürman, Günhan; Akan, Hamdi

    2016-01-01

    Objective: The increased risk of infection for patients caused by construction and renovation near hematology inpatient clinics is a major concern. The use of high-efficiency particulate absorption (HEPA) filters can reduce the risk of infection. However, there is no standard protocol indicating the use of HEPA filters for patients with hematological malignancies, except for those who have undergone allogeneic hematopoietic stem cell transplantation. This quasi-experimental study was designed to measure the efficacy of HEPA filters in preventing infections during construction. Materials and Methods: Portable HEPA filters were placed in the rooms of patients undergoing treatment for hematological malignancies because of large-scale construction taking place near the hematology clinic. The rates of infection during the 6 months before and after the installation of the portable HEPA filters were compared. A total of 413 patients were treated during this 1-year period. Results: There were no significant differences in the antifungal prophylaxis and treatment regimens between the groups. The rates of infections, clinically documented infections, and invasive fungal infections decreased in all of the patients following the installation of the HEPA filters. When analyzed separately, the rates of invasive fungal infections were similar before and after the installation of HEPA filters in patients who had no neutropenia or long neutropenia duration. HEPA filters were significantly protective against infection when installed in the rooms of patients with acute lymphocytic leukemia, patients who were undergoing consolidation treatment, and patients who were neutropenic for 1-14 days. Conclusion: Despite the advent of construction and the summer season, during which environmental Aspergillus contamination is more prevalent, no patient or patient subgroup experienced an increase in fungal infections following the installation of HEPA filters. The protective effect of HEPA filters against infection was more pronounced in patients with acute lymphocytic leukemia, patients undergoing consolidation therapy, and patients with moderate neutropenia. PMID:26376622

  5. A Quasi-Experimental Study Analyzing the Effectiveness of Portable High-Efficiency Particulate Absorption Filters in Preventing Infections in Hematology Patients during Construction.

    PubMed

    Özen, Mehmet; Yılmaz, Gülden; Coşkun, Belgin; Topçuoğlu, Pervin; Öztürk, Bengi; Gündüz, Mehmet; Atilla, Erden; Arslan, Önder; Özcan, Muhit; Demirer, Taner; İlhan, Osman; Konuk, Nahide; Balık, İsmail; Gürman, Günhan; Akan, Hamdi

    2016-03-05

    The increased risk of infection for patients caused by construction and renovation near hematology inpatient clinics is a major concern. The use of high-efficiency particulate absorption (HEPA) filters can reduce the risk of infection. However, there is no standard protocol indicating the use of HEPA filters for patients with hematological malignancies, except for those who have undergone allogeneic hematopoietic stem cell transplantation. This quasi-experimental study was designed to measure the efficacy of HEPA filters in preventing infections during construction. Portable HEPA filters were placed in the rooms of patients undergoing treatment for hematological malignancies because of large-scale construction taking place near the hematology clinic. The rates of infection during the 6 months before and after the installation of the portable HEPA filters were compared. A total of 413 patients were treated during this 1-year period. There were no significant differences in the antifungal prophylaxis and treatment regimens between the groups. The rates of infections, clinically documented infections, and invasive fungal infections decreased in all of the patients following the installation of the HEPA filters. When analyzed separately, the rates of invasive fungal infections were similar before and after the installation of HEPA filters in patients who had no neutropenia or long neutropenia duration. HEPA filters were significantly protective against infection when installed in the rooms of patients with acute lymphocytic leukemia, patients who were undergoing consolidation treatment, and patients who were neutropenic for 1-14 days. Despite the advent of construction and the summer season, during which environmental Aspergillus contamination is more prevalent, no patient or patient subgroup experienced an increase in fungal infections following the installation of HEPA filters. The protective effect of HEPA filters against infection was more pronounced in patients with acute lymphocytic leukemia, patients undergoing consolidation therapy, and patients with moderate neutropenia.

  6. The American mobile satellite system

    NASA Technical Reports Server (NTRS)

    Garner, William B.

    1990-01-01

    During 1989, the American Mobile Satellite Corporation (AMSC) was authorized to construct, launch, and operate satellites to provide mobile satellite services (MSS) to the U.S. and Puerto Rico. The AMSC has undertaken three major development programs to bring a full range of MSS services to the U.S. The first program is the space segment program that will result in the construction and launch of the satellites as well as the construction and installation of the supporting ground telemetry and command system. The second segment will result in the specification, design, development, construction, and installation of the Network Control System necessary for managing communications access to the satellites, and the specification and development of ground equipment for standard circuit switched and packet switched communications services. The third program is the Phase 1 program to provide low speed data services within the U.S. prior to availability of the AMSC satellites and ground segment. Described here are the present status and plans for these three programs as well as an update on related business arrangements and regulatory matters.

  7. 7 CFR 58.214 - General construction, repair and installation.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 3 2010-01-01 2010-01-01 false General construction, repair and installation. 58.214... Service 1 Equipment and Utensils § 58.214 General construction, repair and installation. All equipment and utensils necessary to the manufacture of dry milk products, including pasteurizer, timing-pump or device...

  8. The construction, testing, and installation of a 6500 r/min 15 000-hp adjustable-speed electric drive for a centrifugal gas compressor

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lawrence, R.G.; Finney, D.; Davidson, D.F.

    1988-07-01

    The construction, testing, and installation of a 6500 r/min 15 000-hp adjustable-speed electric drive for a centrifugal gas compressor is presented. A power electronic converter is applied to control the speed of a 5-kV motor. The motor is directly coupled to a 6500 r/min compressor and replaced a steam turbine. Dual converters are used in a twelve-pulse arrangement at both the utility and the motor. The motor is of solid rotor construction, with dual 30/sup 0/ displaced stator windings. Finite-element analysis is used to optimize the motor designs for use with a variable-frequency static converter. Full-power tests are completed whichmore » confirm theoretical predictions on losses, performance, and operation. The electrical drive takes up considerably less space and is much more efficient than the steam turbine it replaced.« less

  9. PROGRESS REPORT: COFIRING PROJECTS FOR WILLOW ISLAND AND ALBRIGHT GENERATING STATIONS

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    K. Payette; D. Tillman

    During the period April 1, 2001--June 30, 2001, Allegheny Energy Supply Co., LLC (Allegheny) accelerated construction of the Willow Island cofiring project, completed the installation of foundations for the fuel storage facility, the fuel receiving facility, and the processing building. Allegheny received all processing equipment to be installed at Willow Island. Allegheny completed the combustion modeling for the Willow Island project. During this time period construction of the Albright Generating Station cofiring facility was completed, with few items left for final action. The facility was dedicated at a ceremony on June 29. Initial testing of cofiring at the facility commenced.more » This report summarizes the activities associated with the Designer Opportunity Fuel program, and demonstrations at Willow Island and Albright Generating Stations. It details the construction activities at both sites along with the combustion modeling at the Willow Island site.« less

  10. Guidelines for using bedload traps in coarse-bedded mountain streams: Construction, installation, operation, and sample processing

    Treesearch

    Kristin Bunte; Kurt W. Swingle; Steven R. Abt

    2007-01-01

    A bedload trap is a portable sampler designed specifically for collecting gravel and cobble bedload (4 to 180 mm in diameter) in wadeable streams. Bedload traps consist of an aluminum frame with a 12 by 8 inch (0.3 by 0.2 m) opening to which a 3- to 5.5-ft (0.9 to 1.65 m) long trailing net is attached. Bedload traps are installed on ground plates that are anchored to...

  11. Process Development for Automated Solar Cell and Module Production. Task 4: Automated Array Assembly

    NASA Technical Reports Server (NTRS)

    Hagerty, J. J.

    1981-01-01

    The Automated Lamination Station is mechanically complete and is currently undergoing final wiring. The high current driver and isolator boards have been completed and installed, and the main interface board is under construction. The automated vacuum chamber has had a minor redesign to increase stiffness and improve the cover open/close mechanism. Design of the Final Assembly Station has been completed and construction is underway.

  12. The CMS Journey to LHC Physics

    ScienceCinema

    Virdee, Tejinder

    2018-04-27

    An overview of the design, the construction and physics of CMS will be given. A history of construction, encompassing the R&D; and challenges faced over the last decade and a half, will be recalled using selected examples. CMS is currently in the final stages of installation and commissioning is gathering pace. After a short status report of where CMS stands today some of the expected (great) physics to come will be outlined.

  13. Ultrareliable PACS: design and clinical evaluation

    NASA Astrophysics Data System (ADS)

    Goble, John C.; Kronander, Torbjorn; Wilske, Nils-Olof; Yngvesson, Jonas T.; Ejderholm, Henrik; Ekstrom, Marie

    1999-07-01

    We describe our experience in the design, installation and clinical evaluation o fan ultra-reliable PACS - a system in which the fundamental design constraint was system availability. This syste has ben constructed using commercial, off-the-shelf hardware and software, using an open system, standards-based approach. The system is deployed in the film-free Department of Pediatric Radiology at the Astrid Lindgren Barnsjukhus a nit of the Karolinska Institute in Stockholm, Sweden.

  14. Chapter 9: The FTU Machine - Design Construction and Assembly

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Pizzuto, A.; Annino, C.; Baldarelli, M.

    2004-05-15

    The main design features and guidelines for the construction of the 8-T cryogenically cooled Frascati Tokamak Upgrade (FTU) are presented. The main features include the very compact toroidal magnets based on the concept of the 'Bitter' type of coil with wedge-shaped turns, utilized for the first time for the Alcator A and C magnets, and the original configuration of the vacuum vessel (VV) structure, which is fully welded in order to achieve the required high strength and electric resistivity. The present toroidal limiter has been installed following several years of operation, and this installation has required the development of specificmore » remote-handling tools. The toroidal limiter consists of 12 independent sectors made of stainless steel carriers and molybdenum alloy (TZM) tiles. The main fabrication processes developed for the toroidal and poloidal coils as well as for the VV are described. It is to be noted that the assembly procedure has required very accurate machining of all the structures requiring several trials and steps. The machine has shown no problem in operating routinely at its maximum design values (8 T, 1.6 MA)« less

  15. 21 CFR 225.30 - Equipment.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... CURRENT GOOD MANUFACTURING PRACTICE FOR MEDICATED FEEDS Construction and Maintenance of Facilities and Equipment § 225.30 Equipment. (a) Equipment which is designed to perform its intended function and is properly installed and used is essential to the manufacture of medicated feeds. Such equipment permits...

  16. Analysis of pavement response data and use of nondestructive testing for improving pavement design.

    DOT National Transportation Integrated Search

    2006-08-01

    The first fully instrumented flexible pavement test section in Maine was constructed in Fall, 2005. This paper presents : the description of the instruments, their installation, and analysis of temperature and stress-strain data collected so far. : T...

  17. Design and Installation of Irrigation System for the Expansion of Sugar cane- Industries in Ahvaz, IRAN.

    NASA Astrophysics Data System (ADS)

    Afshari, E.; Afshari, S.

    2005-12-01

    This paper presents achievements of a twelve years ongoing project expansion of sugar cane- industries as a major agricultural development in Ahvaz, IRAN. The entire project is divided in to seven units and each unit provides irrigation water for 30,000 acres of sugar cane farms in Ahwaz. Absou Inc. is one of the consulting firms that is in charge of design and overseeing installation of irrigation system as well as the development of lands for sugar-cane cultivation at one of the units, called Farabi unit .In general, the mission of project is to Pump fresh water from Karoon River and direct it to the sugar cane farm for irrigation. In particular, the task of design and installation include, (1) build a pumping station at Karoon River with capacity of 1271 ft3/sec, (2) transfer water by main channel from Karoon rive to the farm site 19 miles (3) install a secondary pumping stations which direct water from main channel to drainage pipes and provides water for local farms (4) build a secondary channels which carries water with pipe lines with total length of 42 miles and diameter of 16 to 32 inch. (5) install drainage pump stations and collectors (6) level the ground surface and prepare it for irrigation (7) build railroad for carrying sugar canes (23 miles). Thus far, more than 15,000 acres of farm in Farabi unit is under sugar cane cultivation. The presentation will illustrate more details about different aspects of the project including design, installation and construction phases.

  18. 49 CFR 192.9 - What requirements apply to gathering lines?

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... gathering line must comply with requirements of this part applicable to transmission lines, except the... onshore gathering line must comply with the requirements of this part applicable to transmission lines... design, installation, construction, initial inspection, and initial testing must be in accordance with...

  19. 49 CFR 192.9 - What requirements apply to gathering lines?

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... gathering line must comply with requirements of this part applicable to transmission lines, except the... onshore gathering line must comply with the requirements of this part applicable to transmission lines... design, installation, construction, initial inspection, and initial testing must be in accordance with...

  20. 49 CFR 192.9 - What requirements apply to gathering lines?

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... gathering line must comply with requirements of this part applicable to transmission lines, except the... onshore gathering line must comply with the requirements of this part applicable to transmission lines... design, installation, construction, initial inspection, and initial testing must be in accordance with...

  1. The Status of the Cms Experiment

    NASA Astrophysics Data System (ADS)

    Green, Dan

    The CMS experiment was completely assembled in the fall of 2008 after a decade of design, construction and installation. During the last two years, cosmic ray data were taken on a regular basis. These data have enabled CMS to align the detector components, both spatially and temporally. Initial use of muons has also established the relative alignment of the CMS tracking and muon systems. In addition, the CMS calorimetry has been crosschecked with test beam data, thus providing an initial energy calibration of CMS calorimetry to about 5%. The CMS magnet has been powered and field mapped. The trigger and data acquisition systems have been installed and run at full speed. The tiered data analysis system has been exercised at full design bandwidth for Tier0, Tier1 and Tier2 sites. Monte Carlo simulation of the CMS detector has been constructed at a detailed geometric level and has been tuned to test beam and other production data to provide a realistic model of the CMS detector prior to first collisions.

  2. Optical fiber cabling technologies for flexible access network

    NASA Astrophysics Data System (ADS)

    Tanji, Hisashi

    2008-07-01

    Fiber-to-the-home (FTTH) outside plant infrastructure should be so designed and constructed as to flexibly deal with increasing subscribers and system evolution to be expected in the future, taking minimization of total cost (CAPEX and OPEX) into consideration. With this in mind, fiber access architectures are reviewed and key technologies on optical fiber and cable for supporting flexible access network are presented. Low loss over wide wavelength (low water peak) and bend-insensitive single mode fiber is a future proof solution. Enhanced separable ribbon facilitates mid-span access to individual fibers in a cable installed, improving fiber utilizing efficiency and flexibility of distribution design. It also contributes to an excellent low PMD characteristic which could be required for video RF overlay system or high capacity long reach metro-access convergence network in the future. Bend-insensitive fiber based cabling technique including field installable connector greatly improves fiber/cable handling in installation and maintenance work.

  3. Altitude Wind Tunnel Drive Fan being Assembled

    NASA Image and Video Library

    1943-07-21

    National Advisory Committee for Aeronautics (NACA) engineers assembled the Altitude Wind Tunnel’s (AWT) large wooden drive fan inside the hangar at the Aircraft Engine Research Laboratory. When it was built at the in the early 1940s the AWT was among the most complex test facilities ever designed. It was the first wind tunnel capable of operating full-scale engines under realistic flight conditions. This simulation included the reduction of air temperature, a decrease in air pressure, and the creation of an airstream velocity of up to 500 miles per hour. The AWT was constructed in 1942 and 1943. This photograph shows NACA engineers Lou Hermann and Jack Aust assembling the tunnel’s drive fan inside the hangar. The 12-bladed, 31-foot-diameter spruce wood fan would soon be installed inside the wind tunnel to create the high-speed airflow. This massive propeller was designed and constructed by the engine lab's design team at Langley Field. John Breisch, a Langley technician with several years of wind tunnel installation experience, arrived in Cleveland at the time of this photograph to supervise the fan assembly inside the hangar. He would return several weeks later to oversee the actual installation in the tunnel. The fan was driven at 410 revolutions per minute by an 18,000-horsepower General Electric induction motor that was located in the rear corner of the Exhauster Building. An extension shaft connected the motor to the fan. A bronze screen protected the fan against damage from failed engine parts sailing through the tunnel. Despite this screen the blades did become worn or cracked over time and had to be replaced. An entire new fan was installed in 1951.

  4. The development of the Garden Banks block 388 FPF mooring system

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Dove, P.G.S.; Librino, F.; Scovell, D.C.

    1995-12-01

    This paper discusses work conducted during the design, procurement and installation of Enserch Exploration, Inc.`s Garden Banks 388 FPF mooring system. The design began with the execution of a trade-off study evaluating and comparing previously installed floating production moorings in the Gulf of Mexico, coupled with evaluation of new concepts and emphasis on cost effective solutions. The design effort involved dynamic analysis and wind tunnel and model tank testing, all in accordance with the newly completed API document RP 2FP1. Inspection of various components from the Placid GC-29 FPS moorings (installed in 1987 and recovered in 1990) determined that sectionsmore » of chain, jacketed spiral strand wire rope, submersible buoys and connectors could be reused with suitable refurbishment. The excellent condition of the rig`s onboard winching system also resulted in the reuse of the windlasses, with specified upgrades. Because a sufficient amount of used wire was not available, a bare spiral strand wire rope construction was adopted, including zinc anodes in the new sections, rather than jacketed strand. The lack of cost effective installation vessels in the Gulf of Mexico at the time of the installation bid posed challenges to Enserch. However, an innovative preset mooring installation scheme involving Heeremac`s SSCV Balder on its own moorings was adopted. Since the vessel was already in the Gulf of Mexico on contract for other projects, a cost effective contract was negotiated. The results of this effort led to considerable cost savings for Enserch, compared to conventional FPF mooring systems previously installed in the Gulf of Mexico.« less

  5. The Guardian. Volume 13, Issue 1, Spring 2011

    DTIC Science & Technology

    2011-01-01

    PROGRAM ELEMENT NUMBER 6. AUTHOR(S) 5d. PROJECT NUMBER 5e. TASK NUMBER 5f. WORK UNIT NUMBER 7. PERFORMING ORGANIZATION NAME(S) AND ADDRESS(ES...Furthermore, there were no AT standards pertaining to design, material, or construction of new and existing buildings ; building standoff requirements; or...installations or forward-deployed areas; DOD-wide anti¬terrorism building standards for construction , standoff, and so forth; and regular FP exercises held at

  6. Design of a photovoltaic system for a passive design northeast all-electric residence

    NASA Astrophysics Data System (ADS)

    Mehalick, E. M.; Tully, G. F.; Johnson, J.; Parker, J.; Felice, R.

    1982-01-01

    A photovoltaic system was developed and integrated into a passively designed, low energy consuming home suitable for the Northeast region of the country. The selected array size is 4.1 kW and covers 51 square meters of roof area. The design addresses the residential market segment of low energy consuming houses with limited roof area availability for photovoltaic arrays. A direct mount, next generation, larger sized, photovoltaic shingle module is used to reduce installation costs over earlier generation shingle modules. A 4 kW line-commutated inverter is used in the power conversion subsystem, since it is representative of currently available equipment. The complete system and house design are described, including all the pertinent installation and construction drawings. Specific performance results are presented for the Boston and Madison region. The system design presented, coupled with previously completed designs, provide a set of design options expected to be available to residential homeowners in the mid 1980's.

  7. Learning to build large structures in space

    NASA Technical Reports Server (NTRS)

    Hagler, T.; Patterson, H. G.; Nathan, C. A.

    1977-01-01

    The paper examines some of the key technologies and forms of construction know-how that will have to be developed and tested for eventual application to building large structures in space. Construction of a shuttle-tended space construction/demonstration platform would comprehensively demonstrate large structure technology, develop construction capability, and furnish a construction platform for a variety of operational large structures. Completion of this platform would lead to demonstrations of the Satellite Power System (SPS) concept, including microwave transmission, fabrication of 20-m-deep beams, conductor installation, rotary joint installation, and solar blanket installation.

  8. 14 CFR 27.733 - Tires.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... STANDARDS: NORMAL CATEGORY ROTORCRAFT Design and Construction Landing Gear § 27.733 Tires. (a) Each landing... gravity. (c) Each tire installed on a retractable landing gear system must, at the maximum size of the tire type expected in service, have a clearance to surrounding structure and systems that is adequate...

  9. Wall Finishes; Carpentry: 901895.

    ERIC Educational Resources Information Center

    Dade County Public Schools, Miami, FL.

    The course outline is designed to provide instruction in selecting, preparing, and installing wall finishing materials. Prerequisites for the course include mastery of building construction plans, foundations and walls, and basic mathematics. Intended for use in grades 11 and 12, the course contains five blocks of study totaling 135 hours of…

  10. 0-6782 : development of design standards for mounting temporary large guide signs.

    DOT National Transportation Integrated Search

    2014-08-01

    A common issue during phased highway : construction projects is the need to temporarily : relocate large guide signs on the roadside or install : new guide signs for temporary use. Many of these : signs are larger than 100 ft2 in size and cannot be :...

  11. 32 CFR 651.33 - Actions normally requiring an EA.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... for the use of a CX: (a) Special field training exercises or test activities in excess of five acres... off-post construction. (c) Changes to established installation land use that generate impacts on the..., fielding, and training involving natural resources, and disposal/demilitarization. System design...

  12. 33 CFR 127.1107 - Electrical systems.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 33 Navigation and Navigable Waters 2 2013-07-01 2013-07-01 false Electrical systems. 127.1107... Waterfront Facilities Handling Liquefied Hazardous Gas Design and Construction § 127.1107 Electrical systems. Electrical equipment and wiring must be of the kind specified by, and must be installed in accordance with...

  13. 33 CFR 127.1107 - Electrical systems.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 33 Navigation and Navigable Waters 2 2010-07-01 2010-07-01 false Electrical systems. 127.1107... Waterfront Facilities Handling Liquefied Hazardous Gas Design and Construction § 127.1107 Electrical systems. Electrical equipment and wiring must be of the kind specified by, and must be installed in accordance with...

  14. 33 CFR 127.1107 - Electrical systems.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 33 Navigation and Navigable Waters 2 2012-07-01 2012-07-01 false Electrical systems. 127.1107... Waterfront Facilities Handling Liquefied Hazardous Gas Design and Construction § 127.1107 Electrical systems. Electrical equipment and wiring must be of the kind specified by, and must be installed in accordance with...

  15. 33 CFR 127.1107 - Electrical systems.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 33 Navigation and Navigable Waters 2 2011-07-01 2011-07-01 false Electrical systems. 127.1107... Waterfront Facilities Handling Liquefied Hazardous Gas Design and Construction § 127.1107 Electrical systems. Electrical equipment and wiring must be of the kind specified by, and must be installed in accordance with...

  16. 33 CFR 127.1107 - Electrical systems.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 33 Navigation and Navigable Waters 2 2014-07-01 2014-07-01 false Electrical systems. 127.1107... Waterfront Facilities Handling Liquefied Hazardous Gas Design and Construction § 127.1107 Electrical systems. Electrical equipment and wiring must be of the kind specified by, and must be installed in accordance with...

  17. 10 CFR 434.520 - Speculative buildings.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... assumed lighting power allowance. 520.5 HVAC Systems and Equipment. If the HVAC system is not completely... construction of future HVAC systems and equipment. These assumptions shall be documented so that future HVAC... calculate the Design Energy Consumption must be documented so that the future installed lighting systems may...

  18. 10 CFR 434.520 - Speculative buildings.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... assumed lighting power allowance. 520.5HVAC Systems and Equipment. If the HVAC system is not completely... construction of future HVAC systems and equipment. These assumptions shall be documented so that future HVAC... calculate the Design Energy Consumption must be documented so that the future installed lighting systems may...

  19. 10 CFR 434.520 - Speculative buildings.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... assumed lighting power allowance. 520.5HVAC Systems and Equipment. If the HVAC system is not completely... construction of future HVAC systems and equipment. These assumptions shall be documented so that future HVAC... calculate the Design Energy Consumption must be documented so that the future installed lighting systems may...

  20. 10 CFR 434.520 - Speculative buildings.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... assumed lighting power allowance. 520.5HVAC Systems and Equipment. If the HVAC system is not completely... construction of future HVAC systems and equipment. These assumptions shall be documented so that future HVAC... calculate the Design Energy Consumption must be documented so that the future installed lighting systems may...

  1. 10 CFR 434.520 - Speculative buildings.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... assumed lighting power allowance. 520.5HVAC Systems and Equipment. If the HVAC system is not completely... construction of future HVAC systems and equipment. These assumptions shall be documented so that future HVAC... calculate the Design Energy Consumption must be documented so that the future installed lighting systems may...

  2. 40 CFR 280.21 - Upgrading of existing UST systems.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 28 2013-07-01 2013-07-01 false Upgrading of existing UST systems. 280.21 Section 280.21 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES... STORAGE TANKS (UST) UST Systems: Design, Construction, Installation and Notification § 280.21 Upgrading of...

  3. 40 CFR 280.21 - Upgrading of existing UST systems.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 27 2014-07-01 2014-07-01 false Upgrading of existing UST systems. 280.21 Section 280.21 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES... STORAGE TANKS (UST) UST Systems: Design, Construction, Installation and Notification § 280.21 Upgrading of...

  4. 40 CFR 280.21 - Upgrading of existing UST systems.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 28 2012-07-01 2012-07-01 false Upgrading of existing UST systems. 280.21 Section 280.21 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES... STORAGE TANKS (UST) UST Systems: Design, Construction, Installation and Notification § 280.21 Upgrading of...

  5. The VolturnUS 1:8 Floating Wind Turbine: Design, Construction, Deployment, Testing, Retrieval, and Inspection of the First Grid-Connected Offshore Wind Turbine in US

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Dagher, Habib; Viselli, Anthony; Goupee, Andrew

    Volume II of the Final Report for the DeepCwind Consortium National Research Program funded by US Department of Energy Award Number: DE-EE0003278.001 summarizes the design, construction, deployment, testing, numerical model validation, retrieval, and post-deployment inspection of the VolturnUS 1:8-scale floating wind turbine prototype deployed off Castine, Maine on June 2nd, 2013. The 1:8 scale VolturnUS design served as a de-risking exercise for a commercial multi-MW VolturnUS design. The American Bureau of Shipping Guide for Building and Classing Floating Offshore Wind Turbine Installations was used to design the prototype. The same analysis methods, design methods, construction techniques, deployment methods, mooring, andmore » anchoring planned for full-scale were used. A commercial 20kW grid-connected turbine was used and was the first offshore wind turbine in the US.« less

  6. Nearshore Pipeline Installation Methods.

    DTIC Science & Technology

    1981-08-01

    inches b) Pipe, materials of construction: fully rigid, semi-rigid, flexible c) Pipeline length, maximum 2 miles d) Pipeline design life , minimum 15...common to their operations. Permanent facilities are specified in the Statement of Work. There- fore, a minimum design life of 15 years is chosen, which...makes the pipe leakproof and resists corrosion and abrasion. 5) Interlocked Z-shaped steel or stainless steel carcass - resists internal and external

  7. The design and construction of the MICE Electron-Muon Ranger

    NASA Astrophysics Data System (ADS)

    Asfandiyarov, R.; Bene, P.; Blondel, A.; Bolognini, D.; Cadoux, F.; Debieux, S.; Drielsma, F.; Giannini, G.; Graulich, J. S.; Husi, C.; Karadzhov, Y.; Lietti, D.; Masciocchi, F.; Nicola, L.; Noah Messomo, E.; Prest, M.; Rothenfusser, K.; Sandstrom, R.; Vallazza, E.; Verguilov, V.; Wisting, H.

    2016-10-01

    The Electron-Muon Ranger (EMR) is a fully-active tracking-calorimeter installed in the beam line of the Muon Ionization Cooling Experiment (MICE). The experiment will demonstrate ionization cooling, an essential technology needed for the realization of a Neutrino Factory and/or a Muon Collider. The EMR is designed to measure the properties of low energy beams composed of muons, electrons and pions, and perform the identification particle-by-particle. The detector consists of 48 orthogonal layers of 59 triangular scintillator bars. The readout is implemented using FPGA custom made electronics and commercially available modules. This article describes the construction of the detector from its design up to its commissioning with cosmic data.

  8. Project SAGE: solar assisted gas energy. Final report and executive summary

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    The Phase III basic objective was establishment of a technical and economic baseline for proper assessment of the practical potential of solar water heating for apartments. Plans can then be formulated to improve SAGE technical design and performance; reduce SAGE costs; refine SAGE market assessment; and identify policies to encourage the use of SAGE. Two SAGE water heating systems were installed and tested. One system was retrofit onto an existing apartment building; the other was installed in a new apartment building. Each installation required approximately 1000 square feet of collector area tilted to an angle of 37/sup 0/ from themore » horizontal, and each was designed to supply about 70 percent of the energy for heating water for approximately 32 to 40 units of a typical two-story apartment complex in Southern California. Actual contruction costs were carefully compiled, and both installations were equipped with performance monitoring equipment. In addition, the operating and maintenance requirements of each installation was evaluated by gas company maintenance engineers. Upon completion of the installation analysis, the SAGE installation cost was further refined by obtaining firm SAGE construction bids from two plumbing contractors in Southern California. Market penetration was assessed by developing a computer simulation program using the technical and economic analysis from the installation experience. Also, the project examined the public policies required to encourage SAGE and other solar energy options. Results are presented and discussed. (WHK)« less

  9. Active/passive scanning. [airborne multispectral laser scanners for agricultural and water resources applications

    NASA Technical Reports Server (NTRS)

    Woodfill, J. R.; Thomson, F. J.

    1979-01-01

    The paper deals with the design, construction, and applications of an active/passive multispectral scanner combining lasers with conventional passive remote sensors. An application investigation was first undertaken to identify remote sensing applications where active/passive scanners (APS) would provide improvement over current means. Calibration techniques and instrument sensitivity are evaluated to provide predictions of the APS's capability to meet user needs. A preliminary instrument design was developed from the initial conceptual scheme. A design review settled the issues of worthwhile applications, calibration approach, hardware design, and laser complement. Next, a detailed mechanical design was drafted and construction of the APS commenced. The completed APS was tested and calibrated in the laboratory, then installed in a C-47 aircraft and ground tested. Several flight tests completed the test program.

  10. Jim Walter Resources installs new overland conveyor

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Fiscor, S.

    2008-12-15

    Embarking on a major expansion plan, the company is constructing a new additional overland conveyor coal to a recently refurbished prep plant. Jim Walter Resources recently invested $20 million in a new 5-mile overland conveyor system to haul coal from the No.7 deep coal mine in Alabama to the No.5 coal preparation plant. The size of the No.7 mine was effectively doubled. The article describes how this expansion move was decided upon and describes the design and installation of the new conveyor which spans approximately 5 miles. 4 photos.

  11. Reduction of the shimmy tendency of tail and nose-wheel landing gears by installation of specially designed tires

    NASA Technical Reports Server (NTRS)

    Schrode, H

    1955-01-01

    Shimmy of tail and nose wheels may be eliminated by installation of dampers and use of large trail; however, this produces construction and operational disadvantages. It is more favorable to employ, instead of the customary tail-wheel tires, tires with lesser shimmy tendency. A description of the best possible form for these tires follows: furthermore, a few general concepts regarding the effects of the condition of the tire, of the type of rolling motion, and of the landing, are discussed.

  12. Fabrication and installation of the Solar Two central receiver

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Litwin, R.Z.; Rogers, R.D.

    The heart of the Solar Two power plant is the molten salt central receiver that has been designed, fabricated, and installed over an 18 month schedule. During this time, the receiver system from Solar One was also completely disassembled and removed. The receiver tower structure, for the most part, was left intact because Solar Two was designed to fit this structure such that construction time and costs could be minimized. In order to meet this aggressive schedule, receiver panel fabrication required the parallel production of many components. The sequence for assembly of the four major receiver panel components (i.e., tubes,more » header assembly, strongback, and header oven covers) and key fabrication activities such as welding are described. Once the receiver panels were complete, their installation at the site was begun, and the order in which receiver system components were installed in the tower is described. The completion of the Solar Two receiver proved the fabricability of this important system. However, successful operation of the system at Solar Two is needed to demonstrate the technical feasibility of the molten salt central receiver concept.« less

  13. 30 CFR 285.632 - What documents must I submit before I may construct and install facilities under my approved COP?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... construct and install facilities under my approved COP? 285.632 Section 285.632 Mineral Resources BUREAU OF... Requirements Activities Under An Approved Cop § 285.632 What documents must I submit before I may construct and install facilities under my approved COP? (a) You must submit to MMS the documents listed in the following...

  14. 30 CFR 585.632 - What documents must I submit before I may construct and install facilities under my approved COP?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... construct and install facilities under my approved COP? 585.632 Section 585.632 Mineral Resources BUREAU OF... Approved Cop § 585.632 What documents must I submit before I may construct and install facilities under my approved COP? (a) You must submit to BOEM the documents listed in the following table: Document...

  15. 30 CFR 585.632 - What documents must I submit before I may construct and install facilities under my approved COP?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... construct and install facilities under my approved COP? 585.632 Section 585.632 Mineral Resources BUREAU OF... Approved Cop § 585.632 What documents must I submit before I may construct and install facilities under my approved COP? (a) You must submit to BOEM the documents listed in the following table: Document...

  16. 30 CFR 585.632 - What documents must I submit before I may construct and install facilities under my approved COP?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... construct and install facilities under my approved COP? 585.632 Section 585.632 Mineral Resources BUREAU OF... Approved Cop § 585.632 What documents must I submit before I may construct and install facilities under my approved COP? (a) You must submit to BOEM the documents listed in the following table: Document...

  17. Specification and Design Criteria for the Construction of Continuous Flight Auger Piles in the Houston Area.

    DOT National Transportation Integrated Search

    1997-08-01

    Five continuous-flight-auger piles were installed in a stiff clay soil following standard practice. Four of these piles were later subjected to lateral load tests to large displacements. The length and diameter of the test piles were varied to invest...

  18. 40 CFR 62.14104 - Requirements for municipal waste combustor operating practices.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ...), proceed in accordance with ASME PTC 4.1-1964 (Reaffirmed 1991), Power Test Codes: Test Code for Steam Generating Units (with 1968 and 1969 Addenda). For design, construction, installation, calibration, and use... Mechanical Engineers, Service Center, 22 Law Drive, Post Office Box 2900, Fairfield, NJ 07007. You may...

  19. 40 CFR 62.14104 - Requirements for municipal waste combustor operating practices.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ...), proceed in accordance with ASME PTC 4.1-1964 (Reaffirmed 1991), Power Test Codes: Test Code for Steam Generating Units (with 1968 and 1969 Addenda). For design, construction, installation, calibration, and use... Mechanical Engineers, Service Center, 22 Law Drive, Post Office Box 2900, Fairfield, NJ 07007. You may...

  20. 40 CFR 62.14104 - Requirements for municipal waste combustor operating practices.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ...), proceed in accordance with ASME PTC 4.1-1964 (Reaffirmed 1991), Power Test Codes: Test Code for Steam Generating Units (with 1968 and 1969 Addenda). For design, construction, installation, calibration, and use... Mechanical Engineers, Service Center, 22 Law Drive, Post Office Box 2900, Fairfield, NJ 07007. You may...

  1. 40 CFR 62.14104 - Requirements for municipal waste combustor operating practices.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ...), proceed in accordance with ASME PTC 4.1-1964 (Reaffirmed 1991), Power Test Codes: Test Code for Steam Generating Units (with 1968 and 1969 Addenda). For design, construction, installation, calibration, and use... Mechanical Engineers, Service Center, 22 Law Drive, Post Office Box 2900, Fairfield, NJ 07007. You may...

  2. 40 CFR 62.14104 - Requirements for municipal waste combustor operating practices.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ...), proceed in accordance with ASME PTC 4.1-1964 (Reaffirmed 1991), Power Test Codes: Test Code for Steam Generating Units (with 1968 and 1969 Addenda). For design, construction, installation, calibration, and use... Mechanical Engineers, Service Center, 22 Law Drive, Post Office Box 2900, Fairfield, NJ 07007. You may...

  3. In-Situ Air Sparaing: Engineering and Design

    DTIC Science & Technology

    2008-01-31

    Construction Materials. Although PVC casing is commonly used, flexible or rigid polyethylene pipe may be more efficient for certain excavation methods, such as...depth, etc.) Piping insulation/ heat tape installed Piping flushed/cleaned/pressure tested Subsurface as-built equipment...4-4 Figure 4-2 Pilot-Scale Piping and Instrumentation Diagram

  4. 14 CFR 31.65 - Position lights.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 1 2010-01-01 2010-01-01 false Position lights. 31.65 Section 31.65... STANDARDS: MANNED FREE BALLOONS Design Construction § 31.65 Position lights. (a) If position lights are installed, there must be one steady aviation white position light and one flashing aviation red (or flashing...

  5. 14 CFR 31.65 - Position lights.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 14 Aeronautics and Space 1 2011-01-01 2011-01-01 false Position lights. 31.65 Section 31.65... STANDARDS: MANNED FREE BALLOONS Design Construction § 31.65 Position lights. (a) If position lights are installed, there must be one steady aviation white position light and one flashing aviation red (or flashing...

  6. 14 CFR 31.65 - Position lights.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 14 Aeronautics and Space 1 2013-01-01 2013-01-01 false Position lights. 31.65 Section 31.65... STANDARDS: MANNED FREE BALLOONS Design Construction § 31.65 Position lights. (a) If position lights are installed, there must be one steady aviation white position light and one flashing aviation red (or flashing...

  7. 14 CFR 31.65 - Position lights.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 14 Aeronautics and Space 1 2014-01-01 2014-01-01 false Position lights. 31.65 Section 31.65... STANDARDS: MANNED FREE BALLOONS Design Construction § 31.65 Position lights. (a) If position lights are installed, there must be one steady aviation white position light and one flashing aviation red (or flashing...

  8. 14 CFR 31.65 - Position lights.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 14 Aeronautics and Space 1 2012-01-01 2012-01-01 false Position lights. 31.65 Section 31.65... STANDARDS: MANNED FREE BALLOONS Design Construction § 31.65 Position lights. (a) If position lights are installed, there must be one steady aviation white position light and one flashing aviation red (or flashing...

  9. Design and Installation of a Disposal Cell Cover Field Test

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Benson, C.H.; Waugh, W.J.; Albright, W.H.

    2011-02-27

    The U.S. Department of Energy’s Office of Legacy Management (LM) initiated a cover assessment project in September 2007 to evaluate an inexpensive approach to enhancing the hydrological performance of final covers for disposal cells. The objective is to accelerate and enhance natural processes that are transforming existing conventional covers, which rely on low-conductivity earthen barriers, into water balance covers, that store water in soil and release it as soil evaporation and plant transpiration. A low conductivity cover could be modified by deliberately blending the upper layers of the cover profile and planting native shrubs. A test facility was constructed atmore » the Grand Junction, Colorado, Disposal Site to evaluate the proposed methodology. The test cover was constructed in two identical sections, each including a large drainage lysimeter. The test cover was constructed with the same design and using the same materials as the existing disposal cell in order to allow for a direct comparison of performance. One test section will be renovated using the proposed method; the other is a control. LM is using the lysimeters to evaluate the effectiveness of the renovation treatment by monitoring hydrologic conditions within the cover profile as well as all water entering and leaving the system. This paper describes the historical experience of final covers employing earthen barrier layers, the design and operation of the lysimeter test facility, testing conducted to characterize the as-built engineering and edaphic properties of the lysimeter soils, the calibration of instruments installed at the test facility, and monitoring data collected since the lysimeters were constructed.« less

  10. Technique for Determination of Rational Boundaries in Combining Construction and Installation Processes Based on Quantitative Estimation of Technological Connections

    NASA Astrophysics Data System (ADS)

    Gusev, E. V.; Mukhametzyanov, Z. R.; Razyapov, R. V.

    2017-11-01

    The problems of the existing methods for the determination of combining and technologically interlinked construction processes and activities are considered under the modern construction conditions of various facilities. The necessity to identify common parameters that characterize the interaction nature of all the technology-related construction and installation processes and activities is shown. The research of the technologies of construction and installation processes for buildings and structures with the goal of determining a common parameter for evaluating the relationship between technologically interconnected processes and construction works are conducted. The result of this research was to identify the quantitative evaluation of interaction construction and installation processes and activities in a minimum technologically necessary volume of the previous process allowing one to plan and organize the execution of a subsequent technologically interconnected process. The quantitative evaluation is used as the basis for the calculation of the optimum range of the combination of processes and activities. The calculation method is based on the use of the graph theory. The authors applied a generic characterization parameter to reveal the technological links between construction and installation processes, and the proposed technique has adaptive properties which are key for wide use in organizational decisions forming. The article provides a written practical significance of the developed technique.

  11. 2005 Tri-Service Infrastructure Systems Conference and Exhibition. Volume 12. Tracks 15, 16 and 17

    DTIC Science & Technology

    2005-08-04

    glare, surface luminances, and uniformity. Also, the importance of daylight on human health and productivity is emphasized. • Exterior lighting design...Electrical Safety Requirements – OSHA CFR Title 29 Part 1910 Occupational Safety and Health Standard, Subpart S – Electrical – Design Safety...Standards and Safety Related Work Practices Part 1926 Safety and Health Regulations for Construction, Subpart K – Electrical – Installation Safety

  12. Extended Plate and Beam Wall System: Concept Investigation and Initial Evaluation

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Wiehagen, J.; Kochkin, V.

    A new and innovative High-R wall design, referred to as the Extended Plate & Beam (EP&B), is under development. The EP&B system uniquely integrates foam sheathing insulation with wall framing such that wood structural panels are installed exterior of the foam sheathing, enabling the use of standard practices for installation of drainage plane, windows and doors, claddings, cavity insulation, and the standard exterior foam sheathing installation approach prone to damage of the foam during transportation of prefabricated wall panels. As part of the ongoing work, the EP&B wall system concept has undergone structural verification testing and has been positively vettedmore » by a group of industry stakeholders. Having passed these initial milestone markers, the advanced wall system design has been analyzed to assess cost implications relative to other advanced wall systems, undergone design assessment to develop construction details, and has been evaluated to develop representative prescriptive requirements for the building code. This report summarizes the assessment steps conducted to-date and provides details of the concept development.« less

  13. Extended Plate and Beam Wall System: Concept Investigation and Initial Evaluation

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Wiehagen, J.; Kochkin, V.

    2015-08-01

    A new and innovative High-R wall design, referred to as the Extended Plate & Beam (EP&B), is under development. The EP&B system uniquely integrates foam sheathing insulation with wall framing such that wood structural panels are installed exterior of the foam sheathing, enabling the use of standard practices for installation of drainage plane, windows and doors, claddings, cavity insulation, and the standard exterior foam sheathing installation approach prone to damage of the foam during transportation of prefabricated wall panels. As part of the ongoing work, the EP&B wall system concept has undergone structural verification testing and has been positively vettedmore » by a group of industry stakeholders. Having passed these initial milestone markers, the advanced wall system design has been analyzed to assess cost implications relative to other advanced wall systems, undergone design assessment to develop construction details, and has been evaluated to develop representative prescriptive requirements for the building code. This report summarizes the assessment steps conducted to-date and provides details of the concept development.« less

  14. ALS superbend magnet performance

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Marks, Steve; Zbasnik, John; Byrne, Warren

    2001-12-10

    The Lawrence Berkeley National Laboratory has been engaged in the design, construction and testing of four superconducting dipoles (Superbends) that are installed in three arcs of the Advanced Light Source (ALS), with the fourth magnet as a spare. This represents a major upgrade to the ALS providing an enhanced flux and brightness at photon energies above 10 keV. In preparation for installation, an extensive set of tests and measurements have been conducted to characterize the magnetic and cryogenic performance of the Superbends and to fiducialize them for accurate placement in the ALS storage ring. The magnets are currently installed, andmore » the storage ring is undergoing final commissioning. This paper will present the results of magnetic and cryogenic testing.« less

  15. Technology demonstration for reducing mercury emissions from small-scale gold refining facilities.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Habegger, L. J.; Fernandez, L. E.; Engle, M.

    2008-06-30

    Gold that is brought from artisanal and small-scale gold mining areas to gold shops for processing and sale typically contains 5-40% mercury. The uncontrolled removal of the residual mercury in gold shops by using high-temperature evaporation can be a significant source of mercury emissions in urban areas where the shops are located. Emissions from gold shop hoods during a burn can exceed 1,000 mg/m{sup 3}. Because the saturation concentration of mercury vapor at operating temperatures at the hood exhaust is less than 100 mg/m{sup 3}, the dominant component of the exhaust is in the form of aerosol or liquid particles.more » The U.S. Environmental Protection Agency (EPA), with technical support from Argonne National Laboratory (Argonne), has completed a project to design and test a technology to remove the dominant aerosol component in the emissions from gold shops. The objective was to demonstrate a technology that could be manufactured at low cost and by using locally available materials and manufacturing capabilities. Six prototypes designed by Argonne were locally manufactured, installed, and tested in gold shops in Itaituba and Creporizao, Brazil. The initial prototype design incorporated a pebble bed as the media for collecting the mercury aerosols, and a mercury collection efficiency of over 90% was demonstrated. Though achieving high efficiencies, the initial prototype was determined to have practical disadvantages such as excessive weight, a somewhat complex construction, and high costs (>US$1,000). To further simplify the construction, operation, and associated costs, a second prototype design was developed in which the pebble bed was replaced with slotted steel baffle plates. The system was designed to have flexibility for installation in various hood configurations. The second prototype with the baffle plate design was installed and tested in several different hood/exhaust systems to determine the optimal installation configuration. The significance of coagulation and collection of the mercury aerosols in exhaust ducts, which is dependent on the hood and collector configuration, was also evaluated. Prototype demonstration tests verified the theoretical basis for mercury aerosol capture that can be used to optimize the baffle plate design, flow rates, and hood exhaust ducts and plenum to achieve 80% or higher removal efficiencies. Results indicated that installation configuration significantly influences a system's capture efficiency. Configurations that retained existing inlet ducts resulted in system efficiencies of more than 80%, whereas installation configurations without inlet ducts significantly reduced capture efficiency. As an alternative to increasing the volume of inlet ducts, the number of baffle plates in the system baffle assembly could be doubled to increase efficiency. Recommended installation and operation procedures were developed on the basis of these results. A water-based mercury capture system developed in Indonesia for installation in smaller shops was also tested and shown to be effective for certain applications. The cost of construction and installation of the baffle plate prototype was approximately US$400. These costs were reported as acceptable by local gold shop owners and government regulators, and were significantly lower than the cost of an alternate charcoal/copper mesh mercury filter available in the region, which costs about US$10,000. A sampling procedure that consists of a particle filter combined with a vapor analyzer was demonstrated as an effective procedure for analyzing both the aerosol and vapor components of the mercury concentrations. Two key findings for enhancing higher mercury collection were identified. First, the aerosol/vapor mercury emissions must be given sufficient time for the mercury particles to coagulate to a size that can be readily captured by the baffle plates. An interval of at least 6 seconds of transit time between the point of evaporation and contact with the slotted baffle plates is recommended. Some particles will also deposit in the exhaust ducts between the point of evaporation and the baffle plates. Second, the slots in the baffle plates create jets that force the mercury particles to impinge and adhere on downstream surfaces. The baffle plates should closely follow the designs developed for this system to be most effective.« less

  16. Analysis and Inverse Design of the HSR Arrow Wing Configuration with Fuselage, Wing, and Flow Through Nacelles

    NASA Technical Reports Server (NTRS)

    Krist, Steven E.; Bauer, Steven X. S.

    1999-01-01

    The design process for developing the natural flow wing design on the HSR arrow wing configuration utilized several design tools and analysis methods. Initial fuselage/wing designs were generated with inviscid analysis and optimization methods in conjunction with the natural flow wing design philosophy. A number of designs were generated, satisfying different system constraints. Of the three natural flow wing designs developed, the NFWAc2 configuration is the design which satisfies the constraints utilized by McDonnell Douglas Aerospace (MDA) in developing a series of optimized configurations; a wind tunnel model of the MDA designed OPT5 configuration was constructed and tested. The present paper is concerned with the viscous analysis and inverse design of the arrow wing configurations, including the effects of the installed diverters/nacelles. Analyses were conducted with OVERFLOW, a Navier-Stokes flow solver for overset grids. Inverse designs were conducted with OVERDISC, which couples OVERFLOW with the CDISC inverse design method. An initial system of overset grids was generated for the OPT5 configuration with installed diverters/nacelles. An automated regridding process was then developed to use the OPT5 component grids to create grids for the natural flow wing designs. The inverse design process was initiated using the NFWAc2 configuration as a starting point, eventually culminating in the NFWAc4 design-for which a wind tunnel model was constructed. Due to the time constraints on the design effort, initial analyses and designs were conducted with a fairly coarse grid; subsequent analyses have been conducted on a refined system of grids. Comparisons of the computational results to experiment are provided at the end of this paper.

  17. 47 CFR 101.131 - Transmitter construction and installation.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 47 Telecommunication 5 2013-10-01 2013-10-01 false Transmitter construction and installation. 101.131 Section 101.131 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) SAFETY AND SPECIAL RADIO SERVICES FIXED MICROWAVE SERVICES Technical Standards § 101.131 Transmitter construction and...

  18. 47 CFR 101.131 - Transmitter construction and installation.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 47 Telecommunication 5 2011-10-01 2011-10-01 false Transmitter construction and installation. 101.131 Section 101.131 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) SAFETY AND SPECIAL RADIO SERVICES FIXED MICROWAVE SERVICES Technical Standards § 101.131 Transmitter construction and...

  19. 47 CFR 101.131 - Transmitter construction and installation.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 47 Telecommunication 5 2014-10-01 2014-10-01 false Transmitter construction and installation. 101.131 Section 101.131 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) SAFETY AND SPECIAL RADIO SERVICES FIXED MICROWAVE SERVICES Technical Standards § 101.131 Transmitter construction and...

  20. 47 CFR 101.131 - Transmitter construction and installation.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 47 Telecommunication 5 2012-10-01 2012-10-01 false Transmitter construction and installation. 101.131 Section 101.131 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) SAFETY AND SPECIAL RADIO SERVICES FIXED MICROWAVE SERVICES Technical Standards § 101.131 Transmitter construction and...

  1. Basement of Structure, Main Power and Design Parameters of Mechanism of Removing Sections of Mechanized Sets of Knife Plane Installation

    NASA Astrophysics Data System (ADS)

    Sysoev, N. I.; Turuk, Yu V.; Kolesnichenko, I. Y.; Lugantsev, B. B.

    2017-10-01

    The reasons for the failure of the pitch stability of the knife-plane installation due to the action of extreme effort in the plane of the seam from the conveyor side on the mechanism of removing sections of mechanized sets are shown. The technique for determining this effort is presented. The constructions of the adaptive mechanisms of the removing sections of mechanized sets with the basements of catamaran type, in the constrictions of which elastic elements (rods) are used, are considered. The constructions of the mechanism of removing a section of the mechanized set with the basement of catamaran type in which the stock of the hydraulic jack is connected with the band loop through the movable rods intermediate basement with a link are worked out. The intermediate basement unloads the stock of the hydraulic jack of the moving installation from the side curving efforts, caused by the action of lateral forces in the plane of the seam on the conveyor side. It increases the reliability and efficiency of work of the knife plane mechanized complex.

  2. Acoustic and other factors relating to the use of sound field systems in classrooms

    NASA Astrophysics Data System (ADS)

    Carey, Anne; Shield, Bridget; Dockrell, Julie; Rigby, Kate

    2005-04-01

    A study has been made of thirty-five primary school classrooms which have Sound Field Systems (SFS) installed. Acoustic surveys of the classrooms have been undertaken and detailed observations made of the physical characteristics of each room such as its construction and design, plus any acoustic treatment. The positioning and type, e.g., column or separate speakers, of SFS installed were also noted. Details of the procedures for purchasing, installing, and maintaining the SFS were obtained where possible, together with information concerning training of teachers in their use. Results from these surveys suggest that in many cases SFS are installed in rooms where their performance may be compromised because of inadequate acoustic conditions. Additionally problems may arise due to inappropriate installation, choice of system, poor maintenance, or lack of training. The effectiveness of acoustic treatment such as absorption applied to ceilings and walls has also been investigated in a range of classrooms and its impact on the use of SFS considered.

  3. Design of a magnetic shielding system for the time of flight enhanced diagnostics neutron spectrometer at Experimental Advanced Superconducting Tokamak

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Cui, Z. Q.; Chen, Z. J.; Xie, X. F.

    2014-11-15

    The novel neutron spectrometer TOFED (Time of Flight Enhanced Diagnostics), comprising 90 individual photomultiplier tubes coupled with 85 plastic scintillation detectors through light guides, has been constructed and installed at Experimental Advanced Superconducting Tokamak. A dedicated magnetic shielding system has been constructed for TOFED, and is designed to guarantee the normal operation of photomultiplier tubes in the stray magnetic field leaking from the tokamak device. Experimental measurements and numerical simulations carried out employing the finite element method are combined to optimize the design of the magnetic shielding system. The system allows detectors to work properly in an external magnetic fieldmore » of 200 G.« less

  4. Cost Planning System

    ERIC Educational Resources Information Center

    Bowen, Brian

    1974-01-01

    The third installment of a Building Cost File points out the necessity of providing a framework for overall cost control during design. A cost analysis (see EA 504 571) illustrates how the use of construction elements or subsystems provide a suitable means. Other related articles are EA 503 949, 950, 951, and EA 504 578-579. (MF)

  5. Production and installation of the LHC low-beta triplets

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Feher, S.; Bossert, R.; DiMarco, J.

    2005-09-01

    The LHC performance depends critically on the low-{beta}, triplets, located on either side of the four interaction points. Each triplet consists of four superconducting quadrupole magnets, which must operate reliably at up to 215 T/m, sustain extremely high heat loads and have an excellent field quality. A collaboration of CERN, Fermilab and KEK was formed in 1996 to design and build the triplet systems, and after nine years of joint effort the production has been completed in 2005. We retrace the main events of the project and present the design features and performance of the low-{beta} quadrupoles, built by KEKmore » and Fermilab, as well as of other vital elements of the triplet. The tunnel installation of the first triplet and plans for commissioning in the LHC are also presented. Apart from the excellent technical results, the construction of the LHC low-{beta} triplets has been a highly enriching experience combining harmoniously the different competences and approaches to engineering in a style reminiscent of high energy physics experiment collaborations, and rarely before achieved in construction of an accelerator.« less

  6. Twelve years in offshore for Doris C. G

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1979-04-12

    The offshore engineering operations of Doris have included the design of concrete and steel offshore structures, the design and construction of diving and underwater equipment, offshore equipment, vessels, and heavy mooring systems, and the design and installation of pipelines and risers. The company has also engaged in pipelaying, marine operations, diving, and inspection and maintenance work. Some achievements in 1978 were the completion, tow-out, and installation of the Ninian central platform and the design of an additional riser for the Frigg field manifold compression platform to connect the Piper field to the Frigg gas pipeline. The articulated gravity tower formore » concrete platforms was certified by Norsk Veritas in 1978, but fatigue tests on the articulating ball joint are continuing. New designs include the fixed gravity structure with removable floats, which makes the substructure much smaller, so that concrete platforms become economically feasible in water depths previously considered prohibitive, and the steel-and-concrete hybrid platform, which has been fully developed and certified as safe and economical.« less

  7. About the features of the design of X-ray systems for nondestructive control in industry

    NASA Astrophysics Data System (ADS)

    Bessonov, V. B.; Obodovskiy, A. V.; Potrakhov, Y. N.

    2018-02-01

    X-ray methods for nondestructive control take the priority place if necessary to exercise quality control of a product, to define presence of defects and to execute expert researches. In the present work, an attempt is made to systematize some features in the design and construction of installations for X-ray non-destructive control using the example of developments conducted at St. Petersburg State Electrotechnical University “LETI”.

  8. WASTE INFORMATION MODELING (WIM) FOR CONSTRUCTION OF THE BUILT ENVIRONMENT

    EPA Science Inventory

    The outcomes will include the construction of full-scale building prototypes. As full-scale pieces are constructed they will be installed throughout the community, and could potentially be used as installations within the local community to demonstrate the use of recycled prod...

  9. 42 CFR 84.173 - Harnesses; installation and construction; minimum requirements.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 42 Public Health 1 2010-10-01 2010-10-01 false Harnesses; installation and construction; minimum... SERVICES OCCUPATIONAL SAFETY AND HEALTH RESEARCH AND RELATED ACTIVITIES APPROVAL OF RESPIRATORY PROTECTIVE... construction; minimum requirements. (a) Each respirator shall, where necessary, be equipped with a suitable...

  10. Implementation of civionics in a second generation steel-free bridge deck

    NASA Astrophysics Data System (ADS)

    Klowak, Chad; Rivera, Evangeline; Mufti, Aftab

    2005-05-01

    As the design and construction of civil structures continue to evolve, it is becoming imperative that these structures be monitored for their health. In order to meet this need, the discipline of Civionics has emerged. Civionics is a new term coined from Civil-Electronics, which is derived from the application of electronics to civil structures. It is similar to the term Avionics, which is used in the aerospace industry. If structural health monitoring is to become part of civil structural engineering, it should include Civionics. It involves the application of electronics to civil structures and aims to assist engineers in realizing the full benefits of structural health monitoring (SHM). In past SHM field applications, the main reason for the failure of a sensor was not the installation of the sensor itself but the egress of the sensor cables. Often, the cables were not handled and protected correctly. For SHM to be successful, specifications must be written on the entire process, beginning with system design and concluding with data collection, interpretation, and management. Civionics specifications include the technical requirements for a SHM system which encompasses fibre optic sensors, cables, conduits, junction boxes and the control room. A specification for data collection and storage is currently being developed as well. In the spring of 2004 research engineers at the University of Manitoba constructed a full-scale second generation steel free bridge deck. The bridge deck is the first of its kind to fully incorporate a complete civionics structural health monitoring system to monitor the deck's behaviour during destructive testing. Throughout the construction of the bridge deck, the entire installation of the civionics system was carried out by research engineers simulating an actual implementation of such a system in a large scale construction environment. One major concern that consulting engineers have raised is the impact that a civionics system that uses conduit, junction boxes, and other electrical ancillary protection, will have when embedded and installed externally on full-scale infrastructure. The full-scale destructive testing of a second generation steel-free bridge deck using a civionics system designed and implemented following guidelines in a civioncs specification manual at the University of Manitoba will provide engineers with the information necessary to address the constructability and structural integrity issues. Civioncs combined with structural health monitoring will provide engineers with feedback necessary to aid in optimizing design techniques and understanding our infrastructures performance, behaviour and state of condition.

  11. Construction method of pre assembled unit of bolt sphere grid

    NASA Astrophysics Data System (ADS)

    Hu, L. W.; Guo, F. L.; Wang, J. L.; Bu, F. M.

    2018-03-01

    The traditional construction of bolt sphere grid has many disadvantages, such as high cost, large amount of work at high altitude and long construction period, in order to make up for these shortcomings, in this paper, a new and applicable construction method is explored: setting up local scaffolding, installing the bolt sphere grid starting frame on the local scaffolding, then the pre assembled unit of bolt sphere grid is assembled on the ground, using small hoisting equipment to lift pre assembled unit to high altitude and install. Compared with the traditional installation method, the construction method has strong practicability and high economic efficiency, and has achieved good social and economic benefits.

  12. Construction of high-rise building with underground parking in Moscow

    NASA Astrophysics Data System (ADS)

    Ilyichev, Vyacheslav; Nikiforova, Nadezhda; Konnov, Artem

    2018-03-01

    Paper presents results of scientific support to construction of unique residential building 108 m high with one storey underground part under high-rise section and 3-storey underground parking connected by underground passage. On-site soils included anthropogenic soil, clayey soils soft-stiff, saturated sands of varied grain coarseness. Design of retaining structure and support system for high-rise part excavation was developed. It suggested installation of steel pipes and struts. Construction of adjacent 3-storey underground parking by "Moscow method" is described in the paper. This method involves implementation of retaining wall consisted of prefabricated panels, truss structures (used as struts) and reinforced concrete slabs. Also design and construction technology is provided for foundations consisted of bored piles 800 MM in diameter joined by slab with base widening diameter of 1500 MM. Experiment results of static and dynamic load testing (ELDY method) are considered. Geotechnical monitoring data of adjacent building and utility systems settlement caused by construction of presented high-rise building were compared to numerical modelling results, predicted and permissible values.

  13. Influence of Installation Effects on Pile Bearing Capacity in Cohesive Soils - Large Deformation Analysis Via Finite Element Method

    NASA Astrophysics Data System (ADS)

    Konkol, Jakub; Bałachowski, Lech

    2017-03-01

    In this paper, the whole process of pile construction and performance during loading is modelled via large deformation finite element methods such as Coupled Eulerian Lagrangian (CEL) and Updated Lagrangian (UL). Numerical study consists of installation process, consolidation phase and following pile static load test (SLT). The Poznań site is chosen as the reference location for the numerical analysis, where series of pile SLTs have been performed in highly overconsolidated clay (OCR ≈ 12). The results of numerical analysis are compared with corresponding field tests and with so-called "wish-in-place" numerical model of pile, where no installation effects are taken into account. The advantages of using large deformation numerical analysis are presented and its application to the pile designing is shown.

  14. Measure Guideline: Ventilation Guidance for Residential High-Performance New Construction - Multifamily

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lstiburek, Joseph

    2017-01-01

    The measure guideline provides ventilation guidance for residential high performance multifamily construction that incorporates the requirements of the ASHRAE 62.2 ventilation and indoor air quality standard. The measure guideline focus is on the decision criteria for weighing cost and performance of various ventilation systems. The measure guideline is intended for contractors, builders, developers, designers and building code officials. The guide may also be helpful to building owners wishing to learn more about ventilation strategies available for their buildings. The measure guideline includes specific design and installation instructions for the most cost effective and performance effective solutions for ventilation in multifamilymore » units that satisfies the requirements of ASHRAE 62.2-2016.« less

  15. Measure Guideline: Ventilation Guidance for Residential High-Performance New Construction - Multifamily

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lstiburek, Joseph

    The measure guideline provides ventilation guidance for residential high performance multifamily construction that incorporates the requirements of the ASHRAE 62.2 ventilation and indoor air quality standard. The measure guideline focus is on the decision criteria for weighing cost and performance of various ventilation systems. The measure guideline is intended for contractors, builders, developers, designers and building code officials. The guide may also be helpful to building owners wishing to learn more about ventilation strategies available for their buildings. The measure guideline includes specific design and installation instructions for the most cost effective and performance effective solutions for ventilation in multifamilymore » units that satisfies the requirements of ASHRAE 62.2-2016.« less

  16. Design and construction of high-sensitivity, infrared bolometers for operation at 300 mK

    NASA Technical Reports Server (NTRS)

    Alsop, D. C.; Inman, C.; Lange, A. E.; Wibanks, T.

    1992-01-01

    The design and construction of 300-mK composite bolometers developed for millimeter-wave astronomical observations are described. Graphite fibers are used as the electrical leads for the thermistor to reduce the thermal conductance and heat capacity associated with the leads. A mechanical suspension made of Nylon fibers provides the required thermal conductance. Electrical noise equivalent powers below 1 x 10 exp -16 W/sq rt Hz have been achieved for detectors with thermal time constants of 11 ms. The detectors were installed in a millimeter-wave photometer and used to perform observations of the cosmic microwave background from a balloonborne platform. The flight performance was consistent with the measured laboratory properties.

  17. 75 FR 65306 - Notice of Intent To Prepare an Environmental Impact Statement for a Proposed Federal Loan...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-22

    ... installation of about nine million photovoltaic (PV) solar modules within approximately 437 arrays and... final project design. The proposed Project would consist of: A solar field of ground-mounted PV modules... Federal Loan Guarantee To Support Construction of the Topaz Solar Farm, San Luis Obispo County, CA AGENCY...

  18. 24 CFR 3286.603 - At or before sale.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... consumer disclosure statement required in § 3286.7(b); and (ii) Verify that the wind, thermal, and roof... lessee plans to install the home for occupancy; and (iii) If the cost of inspection of the home's... designed and constructed for specific wind, thermal, and roof load zones; and (2) If the home is sited in a...

  19. 24 CFR 3286.603 - At or before sale.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... consumer disclosure statement required in § 3286.7(b); and (ii) Verify that the wind, thermal, and roof... lessee plans to install the home for occupancy; and (iii) If the cost of inspection of the home's... designed and constructed for specific wind, thermal, and roof load zones; and (2) If the home is sited in a...

  20. 24 CFR 3286.603 - At or before sale.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... consumer disclosure statement required in § 3286.7(b); and (ii) Verify that the wind, thermal, and roof... lessee plans to install the home for occupancy; and (iii) If the cost of inspection of the home's... designed and constructed for specific wind, thermal, and roof load zones; and (2) If the home is sited in a...

  1. 24 CFR 3286.603 - At or before sale.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... consumer disclosure statement required in § 3286.7(b); and (ii) Verify that the wind, thermal, and roof... lessee plans to install the home for occupancy; and (iii) If the cost of inspection of the home's... designed and constructed for specific wind, thermal, and roof load zones; and (2) If the home is sited in a...

  2. 24 CFR 3286.603 - At or before sale.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... consumer disclosure statement required in § 3286.7(b); and (ii) Verify that the wind, thermal, and roof... lessee plans to install the home for occupancy; and (iii) If the cost of inspection of the home's... designed and constructed for specific wind, thermal, and roof load zones; and (2) If the home is sited in a...

  3. Serb guardrail in-service evaluation : S. Ashland to California State Line, F.A.P. IR-5-1(113)00, Jackson County : experimental features construction-report.

    DOT National Transportation Integrated Search

    1990-03-01

    This report covers the installation of two Self-Restoring Barrier (SERB) guardrails on Interstate-5 south of Ashland Oregon. The SERB design was developed to reduce repair cost and increase safety when compared to conventional barriers. This is accom...

  4. Can Learning Motivation Predict Learning Achievement? A Case Study of a Mobile Game-Based English Learning Approach

    ERIC Educational Resources Information Center

    Tsai, Chia-Hui; Cheng, Ching-Hsue; Yeh, Duen-Yian; Lin, Shih-Yun

    2017-01-01

    This study applied a quasi-experimental design to investigate the influence and predictive power of learner motivation for achievement, employing a mobile game-based English learning approach. A system called the Happy English Learning System, integrating learning material into a game-based context, was constructed and installed on mobile devices…

  5. Case study comparison of two pellet heating facilities in southeastern Alaska

    Treesearch

    David Nicholls; Allen Brackley; Robert Deering; Daniel Parrent; Brian Kleinhenz; Craig. Moore

    2016-01-01

    Over the past decade, wood-energy use in Alaska has grown dramatically. Since 2000, several dozen new wood-energy installations have been established, with numerous others in the design or construction phase. This case study report compares two wood-pellet heating systems in Juneau, Alaska. The Tlingit-Haida Regional Housing Authority, a native housing authority that...

  6. Performance Probability Distributions for Sediment Control Best Management Practices

    NASA Astrophysics Data System (ADS)

    Ferrell, L.; Beighley, R.; Walsh, K.

    2007-12-01

    Controlling soil erosion and sediment transport can be a significant challenge during the construction process due to the extent and conditions of bare, disturbed soils. Best Management Practices (BMPs) are used as the framework for the design of sediment discharge prevention systems in stormwater pollution prevention plans which are typically required for construction sites. This research focuses on commonly-used BMP systems for perimeter control of sediment export: silt fences and fiber rolls. Although these systems are widely used, the physical and engineering parameters describing their performance are not well understood. Performance expectations are based on manufacturer results, but due to the dynamic conditions that exist on a construction site performance expectations are not always achievable in the field. Based on experimental results product performance is shown to be highly variable. Experiments using the same installation procedures show inconsistent sediment removal performances ranging from (>)85 percent to zero. The goal of this research is to improve the determination of off-site sediment yield based on probabilistic performance results of perimeter control BMPs. BMPs are evaluated in the Soil Erosion Research Laboratory (SERL) in the Civil and Environmental Engineering department at San Diego State University. SERL experiments are performed on a 3-m by 10-m tilting soil bed with a soil depth of 0.5 meters and a slope of 33 percent. The simulated storm event consists of 17 mm/hr for 20 minutes followed by 51 mm/hr for 30 minutes. The storm event is based on an ASTM design storm intended to simulate BMP failures. BMP performance is assessed based on experiments where BMPs are installed per manufacture specifications, less than optimal installations, and no treatment conditions. Preliminary results from 30 experiments are presented and used to develop probability distributions for BMP sediment removal efficiencies. The results are then combined with spatial and temporal distributions of perimeter sediment loadings for a construction site to estimate the time dependent risk of off-site sediment discharge over the duration of a project (ex., 0, 25, 50, 75 and 100 percent complete). The results are used to highlight the importance of considering all phases of construction when developing stormwater pollution prevention plans.

  7. Passive cooling and heating program at Oak Ridge National Laboratory for FY-1981

    NASA Astrophysics Data System (ADS)

    Shapira, H. B.; Kaplan, S. I.; Chester, C. V.

    Construction was completed of an earth-sheltered, passively solar heated office-dormitory, the Joint Institute for Heavy Ion Research, designed at ORNL. Instrumentation of the building was designed, procured, and installed. Building performance will be monitored and compared with predictions of the DOE-2 code. A study of the incorporation of vegetation on architecture was conducted by the Harvard School of Design. A final report was issued which is a prototype handbook for the use of vegetation to reduce cooling loads in structures. An experiment to reduce the cooling requirement of mobile homes by shading with fast-growing vines was begun: a maintenance-oriented trellis was constructed and vines were planted. An RFP for the production of a prototype set of reflective insulating blinds was issued.

  8. Design and implementation of a preprocessing system for a sodium lidar

    NASA Technical Reports Server (NTRS)

    Voelz, D. G.; Sechrist, C. F., Jr.

    1983-01-01

    A preprocessing system, designed and constructed for use with the University of Illinois sodium lidar system, was developed to increase the altitude resolution and range of the lidar system and also to decrease the processing burden of the main lidar computer. The preprocessing system hardware and the software required to implement the system are described. Some preliminary results of an airborne sodium lidar experiment conducted with the preprocessing system installed in the sodium lidar are presented.

  9. Gasification in pulverized coal flames. Second annual progress report, July 1976--August 1977. [Pulverized coal

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    George, P. E.; Lenzer, R. C.; Thomas, J. F.

    1977-08-01

    This project concerns the production of power and synthesis gases from pulverized coal via suspension gasification. Swirling flow in both concentric jet and cyclone gasifiers will separate oxidation and reduction zones. Gasifier performance will be correlated with internally measured temperature and concentration profiles. The test cell flow system and electrical system, which includes a safety interlock design, has been installed. Calibration of the UTI-30C mass spectrometer and construction of the gas sampling system are complete. Both the coal feeder, which has been calibrated, and the boiler are ready for integration into the test cell flow system. Construction and testing ofmore » the cyclone reactor, including methane combustion experiments, is complete. The confined jet reactor has been designed and construction is underway. Investigation of combustion and gasification modeling techniques has begun.« less

  10. Construction and test of new precision drift-tube chambers for the ATLAS muon spectrometer

    NASA Astrophysics Data System (ADS)

    Kroha, H.; Kortner, O.; Schmidt-Sommerfeld, K.; Takasugi, E.

    2017-02-01

    ATLAS muon detector upgrades aim for increased acceptance for muon triggering and precision tracking and for improved rate capability of the muon chambers in the high-background regions of the detector with increasing LHC luminosity. The small-diameter Muon Drift Tube (sMDT) chambers have been developed for these purposes. With half of the drift-tube diameter of the MDT chambers and otherwise unchanged operating parameters, sMDT chambers share the advantages of the MDTs, but have an order of magnitude higher rate capability and can be installed in detector regions where MDT chambers do not fit in. The chamber assembly methods have been optimized for mass production, minimizing construction time and personnel. Sense wire positioning accuracies of 5 μm have been achieved in serial production for large-size chambers comprising several hundred drift tubes. The construction of new sMDT chambers for installation in the 2016/17 winter shutdown of the LHC and the design of sMDT chambers in combination with new RPC trigger chambers for replacement of the inner layer of the barrel muon spectrometer are in progress.

  11. Improved refractory performance through partnership

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Linck, F.E.; Peters, D.

    1995-12-31

    From the early designs and construction of Circulating Fluidized Bed (CFB) boilers, many improvements have been made based upon observations of performance. Included in these improvements have been the refractory linings. The early refractory linings were subjected to extreme fluctuations in temperatures as the units experienced up and down conditions. As the designs were improved refractory failures were mostly due to the operating conditions and other mechanical stresses rather than continual shutdowns and startups. More recent problems observed with refractory linings are localized areas of high erosion, corrosion and cracking which result in hot spots and eventual shutdowns for repair.more » Today the objective of refractory suppliers and installers is to strive towards planned shutdowns rather than emergency shutdowns. This can be accomplished through partnerships between operations, material suppliers and installers. In essence, the concept is a cooperative effort between these groups to solve the variety of refractory problems in order to achieve longer refractory lining performance and less chance for emergency shutdowns. The reliability of the refractory lining is dependent on the successful combination of the material selected, proper design and the installation of the refractory material. Where these three elements combine, the lining has the best chance of performing its intended purpose.« less

  12. Exploring Information Generation and Propagation from the Point of Installation on Construction Jobsites: An SNA/ABM Hybrid Approach

    ERIC Educational Resources Information Center

    Moore, Heather

    2013-01-01

    Construction requires the knowledge and experience of craftsmen. The knowledge and experience is gained through local coordination and local adaption at points of installation, which classifies the work as complex production. Information generated at these points of installation can be valuable in understanding how and why workers make decisions,…

  13. Food irradiation: Technology transfer in Asia, practical experiences

    NASA Astrophysics Data System (ADS)

    Kunstadt, Peter; Eng, P.

    1993-10-01

    Nordion International Inc., in cooperation with the Thai Office of Atomic Energy for Peace (OAEP) and the Canadian International Development Agency (CIDA) recently completed a unique food irradiation technology transfer project in Thailand. This complete food irradiation technology transfer project included the design and construction of an automatic multipurpose irradiation facility as well as the services of construction and installation management and experts in facility operation, maintenance and training. This paper provides an insight into the many events that led to the succesful conclusion of the world's first complete food irradiation technology transfer project.

  14. Safeguards-by-Design: Guidance for Independent Spent Fuel Dry Storage Installations (ISFSI)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Trond Bjornard; Philip C. Durst

    2012-05-01

    This document summarizes the requirements and best practices for implementing international nuclear safeguards at independent spent fuel storage installations (ISFSIs), also known as Away-from- Reactor (AFR) storage facilities. These installations may provide wet or dry storage of spent fuel, although the safeguards guidance herein focuses on dry storage facilities. In principle, the safeguards guidance applies to both wet and dry storage. The reason for focusing on dry independent spent fuel storage installations is that this is one of the fastest growing nuclear installations worldwide. Independent spent fuel storage installations are typically outside of the safeguards nuclear material balance area (MBA)more » of the reactor. They may be located on the reactor site, but are generally considered by the International Atomic Energy Agency (IAEA) and the State Regulator/SSAC to be a separate facility. The need for this guidance is becoming increasingly urgent as more and more nuclear power plants move their spent fuel from resident spent fuel ponds to independent spent fuel storage installations. The safeguards requirements and best practices described herein are also relevant to the design and construction of regional independent spent fuel storage installations that nuclear power plant operators are starting to consider in the absence of a national long-term geological spent fuel repository. The following document has been prepared in support of two of the three foundational pillars for implementing Safeguards-by-Design (SBD). These are: i) defining the relevant safeguards requirements, and ii) defining the best practices for meeting the requirements. This document was prepared with the design of the latest independent dry spent fuel storage installations in mind and was prepared specifically as an aid for designers of commercial nuclear facilities to help them understand the relevant international requirements that follow from a country’s safeguards agreement with the IAEA. If these requirements are understood at the earliest stages of facility design, it will help eliminate the costly retrofit of facilities that has occurred in the past to accommodate nuclear safeguards, and will help the IAEA implement nuclear safeguards worldwide, especially in countries building their first nuclear facilities. It is also hoped that this guidance document will promote discussion between the IAEA, State Regulator/SSAC, Project Design Team, and Facility Owner/Operator at an early stage to ensure that new ISFSIs will be effectively and efficiently safeguarded. This is intended to be a living document, since the international nuclear safeguards requirements may be subject to revision over time. More importantly, the practices by which the requirements are met are continuously modernized by the IAEA and facility operators for greater efficiency and cost effectiveness. As these improvements are made, it is recommended that the subject guidance document be updated and revised accordingly.« less

  15. Cabling design of booster and storage ring construction progress of TPS

    NASA Astrophysics Data System (ADS)

    Wong, Y.-S.; Liu, K.-B.; Liu, C.-Y.; Wang, b.-S.

    2017-06-01

    The 2012 Taiwan Photon Source (TPS) cable construction project started after 10 months to complete the cable laying and installation of power supply. The circumference of the booster ring (BR) is 496.8 m, whereas that of the storage ring (SR) is 518.4 m. Beam current is set to 500 mA at 3.3 GeV. The paper on grounding systems discusses the design of the ground wire (< 0.2 Ω) with low impedance, power supply of the accelerator and cabling tray. The flow and size of the ground current are carefully evaluated to avoid grounded current from flowing everywhere, which causes interference problems. In the design of the TPS, special shielding will be established to isolate the effects of electromagnetic interference on the magnet and ground current. Booster ring dipoles are connected by a series of 54-magnet bending dipole; the cable size of its stranded wire measures 250 mm2, with a total length of 5000 m. Booster ring and storage ring quadrupoles have 150 magnets; the cable size of their stranded wire is 250 mm2, with a total length of 17000 m. Storage ring dipole consists of 48 magnets; the cable size of its stranded wire is 325 mm2, with a total length of 6000 m. This study discusses the power supply cabling design of the storage ring and booster ring construction progress of TPS. The sections of this paper are divided into discussions of the construction of the control and instrument area, cabling layout of booster ring and storage ring, as well as the installation and commission machine. This study also discusses the use of a high-impedance meter to determine the effect of cabling insulation and TPS power supply machine on energy transfer to ensure the use of safe and correct magnet.

  16. Design and installation of a Prototype Geohazard Monitoring System near Machu Picchu, Peru

    NASA Astrophysics Data System (ADS)

    Bulmer, M. H.; Farquhar, T.

    2010-09-01

    The town of Machu Picchu, Peru, serves the >700 000 tourists visiting Machu Picchu annually. It has grown threefold in population in the past two decades. Due to the limited low-lying ground, construction is occurring on the unstable valley slopes. Slopes range from <10° on the valley floor to >70° in the surrounding mountains. The town has grown on a delta formed at the confluence of the Alcamayo, Aguas Calientes and Vilcanota Rivers. Geohazards in and around the town of particular concern are 1) large rocks falling onto the town and/or the rail line, 2) flash flooding by any one of its three rivers, and 3) mudflows and landslides. A prototype early warning system that could monitor weather, river flow and slope stability was installed along the Aguas Calientes River in 2009. This has a distributed modular construction allowing components to be installed, maintained, salvaged, and repaired by local technicians. A diverse set of candidate power, communication and sensor technologies was evaluated. Most of the technologies had never been deployed in similar terrain, altitude or weather. The successful deployment of the prototype proved that it is technically feasible to develop early warning capacity in the town.

  17. Solar Energy Demonstrations

    NASA Technical Reports Server (NTRS)

    1979-01-01

    Solar energy furnishes all of the heating and hot water needs, plus 80 percent of the air conditioning, for the two-story Reedy Creek building. A unique feature of this installation is that the 16 semi-cylindrical solar collectors (center photo on opposite page with closeup of a single collector below it) are not mounted atop the roof as is customary, they actually are the roof. This arrangement eliminates the usual trusses, corrugated decking and insulating concrete in roof construction; that, in turn, reduces overall building costs and makes the solar installation more attractive economically. The Reedy Creek collectors were designed and manufactured by AAI Corporation of Baltimore, Maryland.

  18. Hard metal exposures. Part 1: Observed performance of three local exhaust ventilation systems.

    PubMed

    Guffey, S E; Simcox, N; Booth, D W; Hibbard, R; Stebbins, A

    2000-04-01

    Not every ventilation system performs as intended; much can be learned when they do not. The purpose of this study was to compare observed initial performance to expected levels for three saw-reconditioning shop ventilation systems and to characterize the changes in performance of the systems over a one-year period. These three local exhaust ventilation systems were intended to control worker exposures to cobalt, cadmium, and chromium during wet grinding, dry grinding, and welding/brazing activities. Prior to installation the authors provided some design guidance based on Industrial Ventilation, a Manual of Recommended Practice. However, the authors had limited influence on the actual installation and operation and no line authority for the systems. In apparent efforts to cut costs and to respond to other perceived needs, the installed systems deviated from the specifications used in pressure calculations in many important aspects, including adding branch ducts, use of flexible ducts, the choice of fans, and the construction of some hoods. After installation of the three systems, ventilation measurements were taken to determine if the systems met design specifications, and worker exposures were measured to determine effectiveness. The results of the latter will be published as a companion article. The deviations from design and maintenance failures may have adversely affected performance. From the beginning to the end of the study period the distribution of air flow never matched the design specifications for the systems. The observed air flows measured within the first month of installation did not match the predicated design air flows for any of the systems, probably because of the differences between the design and the installed system. Over the first year of operation, hood air flow variability was high due to inadequate cleaning of the sticky process materials which rapidly accumulated in the branch ducts. Poor distribution of air flows among branch ducts frequently produced individual hood air flows that were far below specified design levels even when the total air flow through that system was more than adequate. To experienced practitioners, it is not surprising that deviations from design recommendations and poor maintenance would be associated with poor system performance. Although commonplace, such experiences have not been documented in peer-reviewed publications to date. This publication is a first step in providing that documentation.

  19. Wing Infrastructure and Development Outlook (WINDO) Final Environmental Assessment

    DTIC Science & Technology

    2006-06-01

    installation, and repair F Construct revetment , paint taxi lines, install runway shoulders, extend/repair flight line, maintain airfield pavement...RKMF990065 CONSTRUCT CHAPEL MEETING FAC C RKMF000041 CONSTRUCT REVETMENT LOLA SUPPORT FAC F RKMF010042 CONSTRUCT SHOULDERS RUNWAY 03L/21R F RKMF030054...100-foot transect intervals. Sampling utilized 100- foot intervals in blocks . Isolate artifacts were recorded on site forms until 1996. They were

  20. Construction Simulation Analysis of 60m-span Concrete Filled Steel Tube arch bridge

    NASA Astrophysics Data System (ADS)

    Shi, Jing Xian; Ding, Qing Hua

    2018-06-01

    The construction process of the CFST arch bridge is complicated. The construction process not only affects the structural stress in the installation, but also determines the form a bridge and internal force of the bridge. In this paper, a 60m span concrete filled steel tube tied arch bridge is taken as the background, and a three-dimensional finite element simulation model is established by using the MIDAS/Civil bridge structure analysis software. The elevation of the main arch ring, the beam stress, the forces in hanger rods and the modal frequency of the main arch during the construction stage are calculated, and the construction process is simulated and analyzed. Effectively and reasonably guide the construction and ensure that the line and force conditions of the completed bridge meet the design requirements and provides a reliable technical guarantee for the safe construction of the bridge.

  1. Scope of Work for Integration Management and Installation Services of the National Ignition Facility Beampath Infrastructure System

    NASA Astrophysics Data System (ADS)

    Coyle, P. D.

    2000-03-01

    The goal of the National Ignition Facility (NIF) project is to provide an above ground experimental capability for maintaining nuclear competence and weapons effects simulation and to provide a facility capable of achieving fusion ignition using solid-state lasers as the energy driver. The facility will incorporate 192 laser beams, which will be focused onto a small target located at the center of a spherical target chamber-the energy from the laser beams will be deposited in a few billionths of a second. The target will then implode, forcing atomic nuclei to sufficiently high temperatures and densities necessary to achieve a miniature fusion reaction. The NIF is under construction, at Livermore, California, located approximately 50 miles southeast of San Francisco, California. The University of California, Lawrence Livermore National Laboratory (LLNL), operating under Prime Contract W-7405-ENG. 48 with the U.S. Department of Energy (DOE), shall subcontract for Integration Management and Installation (IMI) Services for the Beampath Infrastructure System (BIS). The BIS includes Beampath Hardware and Beampath Utilities. Conventional Facilities work for the NIF Laser and Target Area Building (LTAB) and Optics Assembly Building (OAB) is over 86 percent constructed. This Scope of Work is for Integration Management and Installation (IMI) Services corresponding to Management Services, Design Integration Services, Construction Services, and Commissioning Services for the NIB BIS. The BIS includes Beampath Hardware and Beampath Utilities. Beampath Hardware and Beampath Utilities include beampath vessels, enclosures, and beam tubes; auxiliary and utility systems; and support structures. A substantial amount of GFE will be provided by the University for installation as part of the infrastructure packages.

  2. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Nephew, E.A.; Abbatiello, L.A.; Ballou, M.L.

    The basic concept of the Annual Cycle Energy System (ACES) - an integrated system for supplying space heating, hot water, and air conditioning to a building - and the theory underlying its design and operation are described. Practical procedures for designing an ACES for a single-family residence, together with recommended guidelines for the construction and installation of system components, are presented. Methods are discussed for estimating the life-cycle cost, component sizes, and annual energy consumption of the system for residential applications in different climatic regions of the US.

  3. Design data brochure for CSI series V solar heating system

    NASA Technical Reports Server (NTRS)

    1978-01-01

    Generalized information on system configuration, system sizing, and mechanical layout is presented to assist the architect or designer in preparing construction drawings and specifications for the installation of the CSI integrated solar heating systems. Efficiency in space utilization of a full length collector and the importance of proper sizing of the collector array are among the topics discussed. Details of storage and transport subsystems are provided along with drawings and specifications of all components of the CSI system.

  4. Proposed Columbia Wind Farm No. 1 : Final Environmental Impact Statement, Joint NEPA/SEPA.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    United States. Bonneville Power Administration; Klickitat County

    1995-09-01

    CARES proposes to construct and operate the 25 megawatt Columbia Wind Farm No. 1 (Project) in the Columbia Hills area of Klickitat County, Washington known as Juniper Point. Wind is not a constant resource and based on the site wind measurement data, it is estimated that the Project would generate approximately 7 average annual MWs of electricity. BPA proposes to purchase the electricity generated by the Project. CARES would execute a contractual agreement with a wind developer, to install approximately 91 wind turbines and associated facilities to generate electricity. The Project`s construction and operation would include: install concrete pier foundationsmore » for each wind turbine; install 91 model AWT-26 wind turbines using 43 m high guyed tubular towers on the pier foundations; construct a new 115/24-kv substation; construct a 149 m{sup 2} steel operations and maintenance building; install 25 pad mount transformers along the turbine access roads; install 4.0 km of underground 24 kv power collection lines to collect power from individual turbines to the end of turbine strings; install 1.2 km of underground communication and transmission lines from each turbine to a pad mount transformer; install 5.6 km of 24 kv wood pole transmission lines to deliver electricity from the pad mount transformers to the Project substation; install 3.2 km of 115 kv wood pole transmission lines to deliver electricity from the Project substation to the Public Utility District No. 1 of Klickitat County(PUD)115 kv Goldendale line; interconnect with the BPA transmission system through the Goldendale line and Goldendale substation owned by the PUD; reconstruct, upgrade, and maintain 8.0 km of existing roads; construct and maintain 6.4 km of new graveled roads along the turbine strings and to individual turbines; and install meteorological towers guyed with rebar anchors on the Project site.« less

  5. DESIGN OF THE SEALEVEL SUSPENDED SOLIDS CONCENTRATION MONITORING SYSTEM

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Unknown

    2001-09-17

    The SEAlevel project between Science & Engineering Associates, Inc. (SEA) and the National Energy Technology Laboratory (NETL) in Morgantown, WV (contract DE-AC21-96MC33126) began in direct response to a need expressed by personnel involved with monitoring fluid levels in underground storage tanks at the Hanford Tank Farms. Hanford expressed a desire for an automated monitoring system that could be installed into tanks through liquid observation wells (LOWs). The LOWs are pipes that run from the surface above the tank to the bottom of the tank. The end of the LOW pipe in the tank waste is sealed. Therefore, the LOW providesmore » a clean conduit through which sensors and monitors can be lowered into the tanks. When the SEAlevel project first began, it was understood that the LOWs would be of steel construction, because several existing LOWs at the time were steel pipes and the plans for all future LOW installations were to be with steel pipes. Based on this assumption the SEAlevel monitoring system was to be made using an array of acoustic sensors. However, during the course of the project it was learned that many existing LOWs are of fiberglass construction and that it was the desire of the Tanks Surveillance Group at Hanford to change plans so that all future LOW installations be of fiberglass construction. The Tanks Surveillance Group wanted fiberglass LOWs to allow for a wider range of sensors to be used in the pipes (i.e., sensors that use electromagnetic signals). In response to this, SEA pursued the development of other types of sensors to install in the LOWs in addition to the acoustic sensors that were being developed. It was determined that a capacitance type sensor was well suited for non-metallic LOW pipes. The results of the analysis, testing and design efforts that were undertaken to address the Hanford needs were detailed in a report submitted to the NETL on August 15, 1997, titled, The Sealevel Approach For Monitoring Liquid Levels In DOE Waste Storage and Processing Tanks.« less

  6. Understory plant community response to compaction and harvest removal in a loblolly pine plantation

    Treesearch

    Benjamin J. Vierra; Gary B. Blank

    2010-01-01

    In 1992 the Southern Research Station, U.S. Forest Service, constructed three Long-Term Soil Productivity (LTSP) installations in a loblolly pine (Pinus taeda L.) plantation on the Croatan National Forest in Craven County, NC. The LTSP study consists of a nationwide network of experiment sites designed to examine the long-term effects of soil...

  7. The HERSCHEL detector: high-rapidity shower counters for LHCb

    NASA Astrophysics Data System (ADS)

    Carvalho Akiba, K.; Alessio, F.; Bondar, N.; Byczynski, W.; Coco, V.; Collins, P.; Dumps, R.; Dzhelyadin, R.; Gandini, P.; Gruberg Cazon, B. R.; Jacobsson, R.; Johnson, D.; Manthey, J.; Mauricio, J.; McNulty, R.; Monteil, S.; Rachwal, B.; Ravonel Salzgeber, M.; Roy, L.; Schindler, H.; Stevenson, S.; Wilkinson, G.

    2018-04-01

    The HERSCHEL detector consists of a set of scintillating counters, designed to increase the coverage of the LHCb experiment in the high-rapidity regions on either side of the main spectrometer. The new detector improves the capabilities of LHCb for studies of diffractive interactions, most notably Central Exclusive Production. In this paper the construction, installation, commissioning, and performance of HERSCHEL are presented.

  8. National Ignition Facility project acquisition plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Callaghan, R.W.

    The purpose of this National Ignition Facility Acquisition Plan is to describe the overall procurement strategy planned for the National Ignition Facility (NIF) Project. The scope of the plan describes the procurement activities and acquisition strategy for the following phases of the NIF Project, each of which receives either plant and capital equipment (PACE) or other project cost (OPC) funds: Title 1 and 2 design and Title 3 engineering (PACE); Optics manufacturing facilitization and pilot production (OPC); Convention facility construction (PACE); Procurement, installation, and acceptance testing of equipment (PACE); and Start-up (OPC). Activities that are part of the base Inertialmore » Confinement Fusion (ICF) Program are not included in this plan. The University of California (UC), operating Lawrence Livermore National Laboratory (LLNL) and Los Alamos National Laboratory, and Lockheed-Martin, which operates Sandia National Laboratory (SNL) and the University of Rochester Laboratory for Laser Energetics (UR-LLE), will conduct the acquisition of needed products and services in support of their assigned responsibilities within the NIF Project structure in accordance with their prime contracts with the Department of Energy (DOE). LLNL, designated as the lead Laboratory, will have responsibility for all procurements required for construction, installation, activation, and startup of the NIF.« less

  9. ENGINEERING AND CONSTRUCTING THE HALLAM NUCLEAR POWER FACILITY REACTOR STRUCTURE

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Mahlmeister, J E; Haberer, W V; Casey, D F

    1960-12-15

    The Hallam Nuclear Power Facility reactor structure, including the cavity liner, is described, and the design philosophy and special design requirements which were developed during the preliminary and final engineering phases of the project are explained. The structure was designed for 600 deg F inlet and 1000 deg F outlet operating sodium temperatures and fabricated of austenitic and ferritic stainless steels. Support for the reactor core components and adequate containment for biological safeguards were readily provided even though quite conservative design philosophy was used. The calculated operating characteristics, including heat generation, temperature distributions and stress levels for full-power operation, aremore » summarized. Ship fabrication and field installation experiences are also briefly related. Results of this project have established that the sodium graphite reactor permits practical and economical fabrication and field erection procedures; considerably higher operating design temperatures are believed possible without radical design changes. Also, larger reactor structures can be similarly constructed for higher capacity (300 to 1000 Mwe) nuclear power plants. (auth)« less

  10. Magnetic fields of green.

    PubMed

    Branton, Scott; Lile, Lawrence

    2011-01-01

    By incorporating even the basic elements of a more environmentally friendly, "green"construction and design in an MRI setting can create a safer, more pleasant space for the patients and staff, better images, and operational cost savings. Using building systems that have reduced amounts of steel can decrease construction time, increase thermal insulation, and reduce the weight of the structure meaning less energy required to transport and install. HVAC systems and lighting design can also play a major role in creating a "green"MRI suite. LEED certification places a focus on quality of the built environment, life cycle cost, and a productive indoor environment, as well as impact on the exterior environment. An LEED certified building considers costs and benefits for the lifetime of the building.

  11. Passive cooling and heating program at Oak Ridge National Laboratory for FY-1981

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Shapira, H.B.; Kaplan, S.I.; Chester, C.V.

    1981-01-01

    Construction was completed of an earth-sheltered, passively solar heated office-dormitory, the Joint Institute for Heavy Ion Research, designed at ORNL. Instrumentation of the building was designed, procured, and installed. Building performance will be monitored and compared with predictions of the DOE-2 code. A study of the incorporation of vegetation on architecture was conducted by the Harvard School of Design. A final report was issued which is a prototype handbook for the use of vegetation to reduce cooling loads in structures. An experiment to reduce the cooling requirement of mobile homes by shading with fast-growing vines was begun: a maintenance-oriented trellismore » was constructed and vines were planted. An RFP for the production of a prototype set of reflective insulating blinds was issued.« less

  12. 40 CFR 265.444 - Inspections.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... § 265.444 Inspections. (a) During construction or installation, liners and cover systems (e.g., membranes, sheets, or coatings) must be inspected for uniformity, damage and imperfections (e.g., holes, cracks, thin spots, or foreign materials). Immediately after construction or installation, liners must be...

  13. 40 CFR 265.444 - Inspections.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... § 265.444 Inspections. (a) During construction or installation, liners and cover systems (e.g., membranes, sheets, or coatings) must be inspected for uniformity, damage and imperfections (e.g., holes, cracks, thin spots, or foreign materials). Immediately after construction or installation, liners must be...

  14. 40 CFR 265.444 - Inspections.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... § 265.444 Inspections. (a) During construction or installation, liners and cover systems (e.g., membranes, sheets, or coatings) must be inspected for uniformity, damage and imperfections (e.g., holes, cracks, thin spots, or foreign materials). Immediately after construction or installation, liners must be...

  15. 40 CFR 265.444 - Inspections.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... § 265.444 Inspections. (a) During construction or installation, liners and cover systems (e.g., membranes, sheets, or coatings) must be inspected for uniformity, damage and imperfections (e.g., holes, cracks, thin spots, or foreign materials). Immediately after construction or installation, liners must be...

  16. Construction and assembly of the wire planes for the MicroBooNE Time Projection Chamber

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Acciarri, R.; Adams, C.; Asaadi, J.

    In this paper we describe how the readout planes for the MicroBooNE Time Projection Chamber were constructed, assembled and installed. We present the individual wire preparation using semi-automatic winding machines and the assembly of wire carrier boards. The details of the wire installation on the detector frame and the tensioning of the wires are given. A strict quality assurance plan ensured the integrity of the readout planes. The different tests performed at all stages of construction and installation provided crucial information to achieve the successful realization of the MicroBooNE wire planes.

  17. 46 CFR 111.15-5 - Battery installation.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 4 2010-10-01 2010-10-01 false Battery installation. 111.15-5 Section 111.15-5 Shipping... REQUIREMENTS Storage Batteries and Battery Chargers: Construction and Installation § 111.15-5 Battery installation. (a) Large batteries. Each large battery installation must be in a room that is only for batteries...

  18. 46 CFR 111.15-5 - Battery installation.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 4 2013-10-01 2013-10-01 false Battery installation. 111.15-5 Section 111.15-5 Shipping... REQUIREMENTS Storage Batteries and Battery Chargers: Construction and Installation § 111.15-5 Battery installation. (a) Large batteries. Each large battery installation must be in a room that is only for batteries...

  19. 46 CFR 111.15-5 - Battery installation.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 4 2014-10-01 2014-10-01 false Battery installation. 111.15-5 Section 111.15-5 Shipping... REQUIREMENTS Storage Batteries and Battery Chargers: Construction and Installation § 111.15-5 Battery installation. (a) Large batteries. Each large battery installation must be in a room that is only for batteries...

  20. 46 CFR 111.15-5 - Battery installation.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 4 2012-10-01 2012-10-01 false Battery installation. 111.15-5 Section 111.15-5 Shipping... REQUIREMENTS Storage Batteries and Battery Chargers: Construction and Installation § 111.15-5 Battery installation. (a) Large batteries. Each large battery installation must be in a room that is only for batteries...

  1. 46 CFR 111.15-5 - Battery installation.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 4 2011-10-01 2011-10-01 false Battery installation. 111.15-5 Section 111.15-5 Shipping... REQUIREMENTS Storage Batteries and Battery Chargers: Construction and Installation § 111.15-5 Battery installation. (a) Large batteries. Each large battery installation must be in a room that is only for batteries...

  2. Latest technologies on ultrasonic cleaning

    NASA Astrophysics Data System (ADS)

    Hofstetter, Hans U.

    2007-05-01

    UCM-AG manufactures Ultrasonic Cleaning Machines for highest quality requirements. The company has the know-how for cleaning and supplies cleaning systems together with the cleaning process. With a UCM of Switzerland Cleaning System, the customer gets the system itself, the cleaning process with a guarantee for the specified result but also all auxiliary equipment needed for perfect results. Therefore UCM also supplies fixtures, linkage to existing automated fabrication facilities water treatment plants etc. Thus the UCM customer gets a turnkey installation - ready to operate and including know-how. UCM of Switzerland will describe the latest technology in ultrasonic precision cleaning on the example of a recent and sophisticated installation. The installation consists of three interlinked cleaning systems which operate completely automated. The 1st system is designed for pre-cleaning to remove waxes, pitch and protection lacquers with environmentally friendly solvents which are non hazardous to the health of the operators. The 2nd system cleans the parts prior to inspection and operates with neutral or slightly alkaline detergents. The 3rd system is designed for final cleaning prior to vacuum coating and perfect results are required. It combines cleaning tanks and DI-Water rinse with lift out and vacuum dryer. The installation combines the latest technologies in ultrasonic cleaning for precision optical components. The system employs multi frequency immersed ultrasonic transducers and special rinsing technologies The complete installation will be explained in detail; the concept in its whole, the lay out, the particular setup of each cleaning system etc. will be shown and explained together with construction particulars of the complete installation.

  3. An Innovation in Building Design

    NASA Astrophysics Data System (ADS)

    1980-01-01

    Collins & Aikman's flat cable permits elimination of ducts and other accommodations traditionally required for building wiring systems, thus gives designers new latitude in planning attractive "open landscape" office layouts. The big factor is that FCC, whose thickness approximates that of two business cards, can be mounted on walls and floors instead of in them, and can be installed beneath a carpet or along a baseboard. Originating from Apollo's command module, its essential sheathing is designed to look like decor rather than plumbing. This could possibly eliminate traditional ducting under floors and elsewhere necessary to accommodate conventional wiring. Construction costs are reduced by 14 percent.

  4. 7 CFR 1924.253 - Definitions.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ...) Serious defects in or improper installation of heating systems or central air conditioning. (4) Defects in... CONSTRUCTION AND REPAIR Complaints and Compensation for Construction Defects § 1924.253 Definitions. As used in..., smoke detectors, railings, etc., as well as failure to provide or properly install devices to aid...

  5. 7 CFR 1924.253 - Definitions.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ...) Serious defects in or improper installation of heating systems or central air conditioning. (4) Defects in... CONSTRUCTION AND REPAIR Complaints and Compensation for Construction Defects § 1924.253 Definitions. As used in..., smoke detectors, railings, etc., as well as failure to provide or properly install devices to aid...

  6. 7 CFR 1924.253 - Definitions.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ...) Serious defects in or improper installation of heating systems or central air conditioning. (4) Defects in... CONSTRUCTION AND REPAIR Complaints and Compensation for Construction Defects § 1924.253 Definitions. As used in..., smoke detectors, railings, etc., as well as failure to provide or properly install devices to aid...

  7. 7 CFR 1924.253 - Definitions.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ...) Serious defects in or improper installation of heating systems or central air conditioning. (4) Defects in... CONSTRUCTION AND REPAIR Complaints and Compensation for Construction Defects § 1924.253 Definitions. As used in..., smoke detectors, railings, etc., as well as failure to provide or properly install devices to aid...

  8. Installation of ventilated facades without scaffolding in high-rise buildings

    NASA Astrophysics Data System (ADS)

    Gnedina, Lyubov; Muchkina, Arina; Labutin, Alexander

    2018-03-01

    This article consider the use of polystyrene concrete blocks during assembling enclosing structure of ventilated facades in high-rise monolithic housing construction. Comparing with traditional technology devices hinged ventilated facade the main advantage of the proposed design is an exception of using scaffold, that leads to a cheapening of the enclosing structure. Proposed solutions are confirmed by patents of the Russian Federation.

  9. The Gerda experiment for the search of 0νββ decay in 76Ge

    DOE PAGES

    Ackermann, K. -H.; Agostini, M.; Allardt, M.; ...

    2013-03-01

    The Gerda collaboration is performing a search for neutrinoless double beta decay of 76 Ge with the eponymous detector. The experiment has been installed and commissioned at the Laboratori Nazionali del Gran Sasso and has started operation in November 2011. The design, construction and first operational results are described, along with detailed information from the R & D phase.

  10. Information Requirements for Selection of Plastics for Use in Building. Proceedings of Conference of the Building Research Institute, Division of Engineering and Industrial Research (Spring 1960).

    ERIC Educational Resources Information Center

    National Academy of Sciences - National Research Council, Washington, DC.

    Several aspects of plastics used in the building industry are discussed, and a general information format for specifying plastics in building construction is given. This format includes--(1) description of product, (2) physical properties, (3) design criteria, (4) installation, (5) maintenance, (6) economics, and (7) case histories. Several uses…

  11. DOE Office of Scientific and Technical Information (OSTI.GOV)

    French, T.

    The Warden ASP project has progressed from the initial planning stage to construction of an injection plant. An ASP chemical system was designed based on laboratory evaluations that included interfacial tension, mobility requirements, rock-alkali interaction, fluid capabilities, and core tests. Field cores were obtained from the Permian No. 5 and No. 6 sands on the Warden lease in Sho-Vel-Tum oil field. A separate tank battery for the pilot pattern area was installed, and a field tracer test is currently being evaluated. Tracer test results to date indicate that there is no major fracturing in the No. 5 sand. There ismore » indication, however, of some channeling through high permeability sand. The field injection plant was designed, and construction is in progress. Several variations of injection plant design have been evaluated. Some plant design details, such as alkali storage, were found to be dependent on the availability of use equipment and project budget. The surfactant storage facility design was shown to be dependent on surfactant rheology.« less

  12. Overview of the ATLAS Insertable B-Layer (IBL) Project

    NASA Astrophysics Data System (ADS)

    Kagan, M. A.

    2014-06-01

    The first upgrade for the Pixel Detector will be a new pixel layer which is currently under construction and will be installed during the first shutdown of the LHC machine, in 2013-14. The new detector, called the Insertable B-layer (IBL), will be installed between the existing Pixel Detector and a new, smaller radius beam-pipe. Two different silicon sensor technologies, planar n-in-n and 3D, will be used, connected with the new generation 130nm IBM CMOS FE-I4 readout chip via solder bump-bonds. A production quality control test bench was set up in the ATLAS inner detector assembly clean room to verify and rate the performance of the detector elements before integration around the beam-pipe. An overview of the IBL project, of the module design, the qualification for these sensor technologies, the integration quality control setups and recent results in the construction of this full scale new concept detector is discussed.

  13. New instruments for solar research

    NASA Technical Reports Server (NTRS)

    Rust, David M.; O'Byrne, John W.; Sterner, Raymond E., II

    1990-01-01

    In fulfilment of its goal to develop early detection and warning of emerging solar magnetic fields, the Center for Applied Solar Physics (CASP) has designed and constructed a solar vector magnetograph (VMG) that will provide unique data on the sunspot regions where flares originate. The instrument is reportedly beginning to approach its goals of measuring all three components of the solar magnetic field with a sensitivity of 50 to 100 G and a spatial resolution on the sun of about 700 km (1 arcsec). Importance of new high-resolution capabilities is stressed and the interpretation of VMG measurements is discussed. The performance of the solar VMG, installed in a 6-m dome at the National Solar Observatory at Sacramento Peak in Sunspot, New Mexico, and its construction and environment are described; particular attention is given to the use and function of the filters. Initial results are examined, including a description and analysis of a magnetogram obtained after installation of an improved blocking filter.

  14. Development of in-vessel components of the microfission chamber for ITER.

    PubMed

    Ishikawa, M; Kondoh, T; Ookawa, K; Fujita, K; Yamauchi, M; Hayakawa, A; Nishitani, T; Kusama, Y

    2010-10-01

    Microfission chambers (MFCs) will measure the total neutron source strength in ITER. The MFCs will be installed behind blanket modules in the vacuum vessel (VV). Triaxial mineral insulated (MI) cables will carry signals from the MFCs. The joint connecting triaxial MI cables in the VV must be considered because the MFCs and the MI cables will be installed separately at different times. Vacuum tight triaxial connector of the MI cable has been designed and a prototype has been constructed. Performance tests indicate that the connector can be applied to the ITER environment. A small bending-radius test of the MI cable indicates no observed damage at a curvature radius of 100 mm.

  15. Development of in-vessel components of the microfission chamber for ITER1

    PubMed Central

    Ishikawa, M.; Kondoh, T.; Ookawa, K.; Fujita, K.; Yamauchi, M.; Hayakawa, A.; Nishitani, T.; Kusama, Y.

    2010-01-01

    Microfission chambers (MFCs) will measure the total neutron source strength in ITER. The MFCs will be installed behind blanket modules in the vacuum vessel (VV). Triaxial mineral insulated (MI) cables will carry signals from the MFCs. The joint connecting triaxial MI cables in the VV must be considered because the MFCs and the MI cables will be installed separately at different times. Vacuum tight triaxial connector of the MI cable has been designed and a prototype has been constructed. Performance tests indicate that the connector can be applied to the ITER environment. A small bending-radius test of the MI cable indicates no observed damage at a curvature radius of 100 mm. PMID:21033834

  16. USAF solar thermal applications case studies

    NASA Technical Reports Server (NTRS)

    1981-01-01

    The potential of solar energy technologies to meet mission related applications for process heat was investigated. The reduction of the dependence of military installations on fossil fuels by promoting the use of more abundant resources where liquid hydrocarbons and natural gas are now used is examined. The evaluation and utilization of renewable energy systems to provide process heat and space heating are emphasized. The application of thermal energy systems is divided into four steps: (1) investigation of the potential operational cost effectiveness of selected thermal technologies; (2) selection of a site and preliminary design of point focussing solar thermal plant; (3) construction and test of an engineering prototype; and (4) installation and operation of a solar thermal energy plant.

  17. Industrializing Offshore Wind Power with Serial Assembly and Lower-cost Deployment - Final Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kempton, Willett

    A team of engineers and contractors has developed a method to move offshore wind installation toward lower cost, faster deployment, and lower environmental impact. A combination of methods, some incremental and some breaks from past practice, interact to yield multiple improvements. Three designs were evaluated based on detailed engineering: 1) a 5 MW turbine on a jacket with pin piles (base case), 2) a 10 MW turbine on a conventional jacket with pin piles, assembled at sea, and 3) a 10 MW turbine on tripod jacket with suction buckets (caissons) and with complete turbine assembly on-shore. The larger turbine, assemblymore » ashore, and the use of suction buckets together substantially reduce capital cost of offshore wind projects. Notable capital cost reductions are: changing from 5 MW to 10 MW turbine, a 31% capital cost reduction, and assembly on land then single-piece install at sea an additional 9% capital cost reduction. An estimated Design 4) estimates further cost reduction when equipment and processes of Design 3) are optimized, rather than adapted to existing equipment and process. Cost of energy for each of the four Designs are also calculated, yielding approximately the same percentage reductions. The methods of Design 3) analyzed here include accepted structures such as suction buckets used in new ways, innovations conceived but previously without engineering and economic validation, combined with new methods not previously proposed. Analysis of Designs 2) and 3) are based on extensive engineering calculations and detailed cost estimates. All design methods can be done with existing equipment, including lift equipment, ports and ships (except that design 4 assumes a more optimized ship). The design team consists of experienced offshore structure designers, heavy lift engineers, wind turbine designers, vessel operators, and marine construction contractors. Comparing the methods based on criteria of cost and deployment speed, the study selected the third design. That design is, in brief: a conventional turbine and tubular tower is mounted on a tripod jacket, in turn atop three suction buckets. Blades are mounted on the tower, not on the hub. The entire structure is built in port, from the bottom up, then assembled structures are queued in the port for deployment. During weather windows, the fully-assembled structures are lifted off the quay, lashed to the vessel, and transported to the deployment site. The vessel analyzed is a shear leg crane vessel with dynamic positioning like the existing Gulliver, or it could be a US-built crane barge. On site, the entire structure is lowered to the bottom by the crane vessel, then pumping of the suction buckets is managed by smaller service vessels. Blades are lifted into place by small winches operated by workers in the nacelle without lift vessel support. Advantages of the selected design include: cost and time at sea of the expensive lift vessel are significantly reduced; no jack up vessel is required; the weather window required for each installation is shorter; turbine structure construction is continuous with a queue feeding the weather-dependent installation process; pre-installation geotechnical work is faster and less expensive; there are no sound impacts on marine mammals, thus minimal spotting and no work stoppage Industrializing Offshore Wind Power 6 of 96 9 for mammal passage; the entire structure can be removed for decommissioning or major repairs; the method has been validated for current turbines up to 10 MW, and a calculation using simple scaling shows it usable up to 20 MW turbines.« less

  18. Evaluation of antistripping additives.

    DOT National Transportation Integrated Search

    1989-01-01

    Several chemical antistripping additives were used in field installations and compared to a similar installation using hydrated lime. The performance of the installations was monitored periodically, and material that was sampled during construction w...

  19. Alternative Shear Panel Configurations for Light Wood Construction. Development, Seismic Performance, and Design Guidance

    NASA Astrophysics Data System (ADS)

    Wilcoski, James; Fischer, Chad; Allison, Tim; Malach, Kelly Jo

    2002-04-01

    Shear panels are used in light wood construction to resist lateral loads resulting from earthquakes or strong winds. These panels are typically made of wooden sheathing nailed to building frame members, but this standard panel design interferes with the installation of sheet insulation. A non-insulated shear panel conducts heat between the building interior and exterior wasting considerable amounts of energy. Several alternative shear panel designs were developed to avoid this insulation-mounting problem and sample panels were tested according to standard cyclic test protocols. One of the alternative designs consisted of diagonal steel straps nailed directly to the structural framing. Several others consisted of sheathing nailed to 2 x 4 framing then set into a larger 2 x 6 structural frame in such a way that no sheathing protruded beyond the edge of the 2 x 6 members. Also samples of industry-standard shear panels were constructed and tested in order to establish a performance baseline. Analytical models were developed to size test panels and predict panel behavior. A procedure was developed for establishing design capacities based on both test data and established baseline panel design capacity. The behavior of each panel configuration is documented and recommended design capacities are presented.

  20. 42 CFR 84.1133 - Harnesses; installation and construction; minimum requirements.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 42 Public Health 1 2010-10-01 2010-10-01 false Harnesses; installation and construction; minimum requirements. 84.1133 Section 84.1133 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES OCCUPATIONAL SAFETY AND HEALTH RESEARCH AND RELATED ACTIVITIES APPROVAL OF RESPIRATORY PROTECTIVE...

  1. 42 CFR 84.1133 - Harnesses; installation and construction; minimum requirements.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 42 Public Health 1 2011-10-01 2011-10-01 false Harnesses; installation and construction; minimum requirements. 84.1133 Section 84.1133 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES OCCUPATIONAL SAFETY AND HEALTH RESEARCH AND RELATED ACTIVITIES APPROVAL OF RESPIRATORY PROTECTIVE...

  2. 42 CFR 84.1133 - Harnesses; installation and construction; minimum requirements.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 42 Public Health 1 2013-10-01 2013-10-01 false Harnesses; installation and construction; minimum requirements. 84.1133 Section 84.1133 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES OCCUPATIONAL SAFETY AND HEALTH RESEARCH AND RELATED ACTIVITIES APPROVAL OF RESPIRATORY PROTECTIVE...

  3. 42 CFR 84.1133 - Harnesses; installation and construction; minimum requirements.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 42 Public Health 1 2014-10-01 2014-10-01 false Harnesses; installation and construction; minimum requirements. 84.1133 Section 84.1133 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES OCCUPATIONAL SAFETY AND HEALTH RESEARCH AND RELATED ACTIVITIES APPROVAL OF RESPIRATORY PROTECTIVE...

  4. 42 CFR 84.1133 - Harnesses; installation and construction; minimum requirements.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 42 Public Health 1 2012-10-01 2012-10-01 false Harnesses; installation and construction; minimum requirements. 84.1133 Section 84.1133 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES OCCUPATIONAL SAFETY AND HEALTH RESEARCH AND RELATED ACTIVITIES APPROVAL OF RESPIRATORY PROTECTIVE...

  5. 42 CFR 84.116 - Harnesses; installation and construction; minimum requirements.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 42 Public Health 1 2012-10-01 2012-10-01 false Harnesses; installation and construction; minimum requirements. 84.116 Section 84.116 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES OCCUPATIONAL SAFETY AND HEALTH RESEARCH AND RELATED ACTIVITIES APPROVAL OF RESPIRATORY PROTECTIVE...

  6. 42 CFR 84.116 - Harnesses; installation and construction; minimum requirements.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 42 Public Health 1 2011-10-01 2011-10-01 false Harnesses; installation and construction; minimum requirements. 84.116 Section 84.116 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES OCCUPATIONAL SAFETY AND HEALTH RESEARCH AND RELATED ACTIVITIES APPROVAL OF RESPIRATORY PROTECTIVE...

  7. 42 CFR 84.116 - Harnesses; installation and construction; minimum requirements.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 42 Public Health 1 2013-10-01 2013-10-01 false Harnesses; installation and construction; minimum requirements. 84.116 Section 84.116 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES OCCUPATIONAL SAFETY AND HEALTH RESEARCH AND RELATED ACTIVITIES APPROVAL OF RESPIRATORY PROTECTIVE...

  8. 42 CFR 84.116 - Harnesses; installation and construction; minimum requirements.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 42 Public Health 1 2010-10-01 2010-10-01 false Harnesses; installation and construction; minimum requirements. 84.116 Section 84.116 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES OCCUPATIONAL SAFETY AND HEALTH RESEARCH AND RELATED ACTIVITIES APPROVAL OF RESPIRATORY PROTECTIVE...

  9. 42 CFR 84.116 - Harnesses; installation and construction; minimum requirements.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 42 Public Health 1 2014-10-01 2014-10-01 false Harnesses; installation and construction; minimum requirements. 84.116 Section 84.116 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES OCCUPATIONAL SAFETY AND HEALTH RESEARCH AND RELATED ACTIVITIES APPROVAL OF RESPIRATORY PROTECTIVE...

  10. Savannah River Plant engineering, design, and construction history of ``S`` projects and other work, January 1961--December 1964. Volume 2

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1970-03-01

    The work described in this volume of ``S`` Projects History is an extension of the type of work described in Volume I. E.I. du Pont de flemours & Company had entered into Contract AT (07-2)-l with the United States Atomic Energy Commission to develop, design, construct, install, and operate facilities to produce heavy water, fissionable materials, and related products. Under this contract,, Du Pont constructed and operated the Savannah River Plant. The engineering, design, and construction for most of the larger ``S`` projects was performed by the Engineering DeDartment. For some of the large and many of the smaller projectsmore » the Engineering Department was responsible only for the construction because the Atomic Energy Division (AED) of the Explosives Department handled the other phases. The Engineering Department Costruction Division also performed the physical work for many of the plant work orders. This volume includes a general description of the Du Pont Engineering Department activities pertaining to the engineering, design, and construction of the ``S`` projects at the Savannah River Plant; brief summaries of the projects and principal work requests; and supplementary informaticn on a few subjects in Volume I for which final data was not available at the closing date. Projects and other plant engineering work which were handled entirely by the Explosives Department -- AED are not included in this history.« less

  11. Septic Systems Contribution to Phosphorus in Shallow Groundwater: Field-Scale Studies Using Conventional Drainfield Designs

    PubMed Central

    Mechtensimer, Sara

    2017-01-01

    Septic systems can be a potential source of phosphorus (P) in groundwater and contribute to eutrophication in aquatic systems. Our objective was to investigate P transport from two conventional septic systems (drip dispersal and gravel trench) to shallow groundwater. Two new in-situ drainfields (6.1 m long by 0.61 m wide) with a 3.72 m2 infiltrative surface were constructed. The drip dispersal drainfield was constructed by placing 30.5 cm commercial sand on top of natural soil and the gravel trench drainfield was constructed by placing 30.5 cm of gravel on top of 30.5 cm commercial sand and natural soil. Suction cup lysimeters were installed in the drainfields (at 30.5, 61, 106.7 cm below infiltrative surface) and piezometers were installed in the groundwater (>300 cm below infiltrative surface) to capture P dynamics from the continuum of unsaturated to saturated zones in the septic systems. Septic tank effluent (STE), soil-water, and groundwater samples were collected for 64 events (May 2012–Dec 2013) at 2 to 3 days (n = 13), weekly (n = 29), biweekly (n = 17), and monthly (n = 5) intervals. One piezometer was installed up-gradient of the drainfields to monitor background groundwater (n = 15). Samples were analyzed for total P (TP), orthophosphate-P (PO4–P), and other–P (TP—PO4-P). The gravel trench drainfield removed significantly (p<0.0001) greater TP (~20%) than the drip dispersal in the first 30.5 cm of the drainfield. However, when STE reached >300 cm in the groundwater, both systems had similar TP reductions of >97%. After 18 months of STE application, there was no significant increase in groundwater TP concentrations in both systems. We conclude that both drainfield designs are effective at reducing P transport to shallow groundwater. PMID:28107505

  12. Septic Systems Contribution to Phosphorus in Shallow Groundwater: Field-Scale Studies Using Conventional Drainfield Designs.

    PubMed

    Mechtensimer, Sara; Toor, Gurpal S

    2017-01-01

    Septic systems can be a potential source of phosphorus (P) in groundwater and contribute to eutrophication in aquatic systems. Our objective was to investigate P transport from two conventional septic systems (drip dispersal and gravel trench) to shallow groundwater. Two new in-situ drainfields (6.1 m long by 0.61 m wide) with a 3.72 m2 infiltrative surface were constructed. The drip dispersal drainfield was constructed by placing 30.5 cm commercial sand on top of natural soil and the gravel trench drainfield was constructed by placing 30.5 cm of gravel on top of 30.5 cm commercial sand and natural soil. Suction cup lysimeters were installed in the drainfields (at 30.5, 61, 106.7 cm below infiltrative surface) and piezometers were installed in the groundwater (>300 cm below infiltrative surface) to capture P dynamics from the continuum of unsaturated to saturated zones in the septic systems. Septic tank effluent (STE), soil-water, and groundwater samples were collected for 64 events (May 2012-Dec 2013) at 2 to 3 days (n = 13), weekly (n = 29), biweekly (n = 17), and monthly (n = 5) intervals. One piezometer was installed up-gradient of the drainfields to monitor background groundwater (n = 15). Samples were analyzed for total P (TP), orthophosphate-P (PO4-P), and other-P (TP-PO4-P). The gravel trench drainfield removed significantly (p<0.0001) greater TP (~20%) than the drip dispersal in the first 30.5 cm of the drainfield. However, when STE reached >300 cm in the groundwater, both systems had similar TP reductions of >97%. After 18 months of STE application, there was no significant increase in groundwater TP concentrations in both systems. We conclude that both drainfield designs are effective at reducing P transport to shallow groundwater.

  13. 42 CFR 84.73 - Harnesses; installation and construction; minimum requirements.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 42 Public Health 1 2011-10-01 2011-10-01 false Harnesses; installation and construction; minimum requirements. 84.73 Section 84.73 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES OCCUPATIONAL SAFETY AND HEALTH RESEARCH AND RELATED ACTIVITIES APPROVAL OF RESPIRATORY PROTECTIVE DEVICES Self...

  14. 42 CFR 84.73 - Harnesses; installation and construction; minimum requirements.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 42 Public Health 1 2012-10-01 2012-10-01 false Harnesses; installation and construction; minimum requirements. 84.73 Section 84.73 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES OCCUPATIONAL SAFETY AND HEALTH RESEARCH AND RELATED ACTIVITIES APPROVAL OF RESPIRATORY PROTECTIVE DEVICES Self...

  15. 42 CFR 84.73 - Harnesses; installation and construction; minimum requirements.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 42 Public Health 1 2013-10-01 2013-10-01 false Harnesses; installation and construction; minimum requirements. 84.73 Section 84.73 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES OCCUPATIONAL SAFETY AND HEALTH RESEARCH AND RELATED ACTIVITIES APPROVAL OF RESPIRATORY PROTECTIVE DEVICES Self...

  16. 42 CFR 84.73 - Harnesses; installation and construction; minimum requirements.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 42 Public Health 1 2014-10-01 2014-10-01 false Harnesses; installation and construction; minimum requirements. 84.73 Section 84.73 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES OCCUPATIONAL SAFETY AND HEALTH RESEARCH AND RELATED ACTIVITIES APPROVAL OF RESPIRATORY PROTECTIVE DEVICES Self...

  17. 42 CFR 84.73 - Harnesses; installation and construction; minimum requirements.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 42 Public Health 1 2010-10-01 2010-10-01 false Harnesses; installation and construction; minimum requirements. 84.73 Section 84.73 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES OCCUPATIONAL SAFETY AND HEALTH RESEARCH AND RELATED ACTIVITIES APPROVAL OF RESPIRATORY PROTECTIVE DEVICES Self...

  18. Experiments on PIM in Support of the Development of IVA Technology for Radiography at AWE

    NASA Astrophysics Data System (ADS)

    Clough, Stephen G.; Thomas, Kenneth J.; Williamson, Mark C.; Phillips, Martin J.; Smith, Ian D.; Bailey, Vernon L.; Kishi, Hiroshi J.; Maenchen, John E.; Johnson, David L.

    2002-12-01

    The PIM machine has been designed and constructed at AWE as part of a program to investigate IVA technology for radiographic applications. PIM, as originally constructed, was a prospective single module of a 14 MV, 100 kA, ten module machine. The design of such a machine is a primary goal of the program as several are required to provide multi-axis radiography in a new Hydrodynamics Research Facility (HRF). Another goal is to design lower voltage machines (ranging from 1 to 5 MV) utilizing PIM style components. The original PIM machine consisted of a single inductive cavity pulsed by a 10 ohm water dielectric Blumlein pulse forming line (PFL) charged by a Marx generator. These components successfully achieved their design voltages and data on the prepulse was obtained showing it to be worse than expected. This information provided a basis for design work on the 14 MV HRF IVA, carried out by Titan-PSD, resulting in a proposal for a prepulse switch, a prototype of which should be installed on PIM by the end of this year. The original single, coaxial switch used to initiate the Blumlein has been replaced by a prototype laser triggered switching arrangement, also designed by Titan-PSD, which it was desired to test prior to its eventual use in the HRF. Despite problems with the laser, which will necessitate further experiments, it was determined that laser triggering with low jitter was occurring. A split oil co-ax feed has now been used to install a second cavity, in parallel with the first, on the PIM Blumlein. This two cavity configuration provides a prototype for future radiographic machines operating at up to 3 MV and a test facility for diode research.

  19. 29 CFR 1926.1414 - Wire rope-selection and installation criteria.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 29 Labor 8 2011-07-01 2011-07-01 false Wire rope-selection and installation criteria. 1926.1414... Derricks in Construction § 1926.1414 Wire rope—selection and installation criteria. (a) Original equipment wire rope and replacement wire rope must be selected and installed in accordance with the requirements...

  20. Forecasting Climate-Induced Ecosystem Changes on Army Installations

    DTIC Science & Technology

    2011-10-01

    W. Hargrove Construction Engineering Research Laboratory (CERL) US Army Engineer Research and Development Center 2902 Newmark Dr. Champaign, IL...unless so designated by other authorized documents. DESTROY THIS REPORT WHEN NO LONGER NEEDED. DO NOT RETURN IT TO THE ORIGINATOR. ERDC/CERL TR-11-36...35 ERDC/CERL TR-11-36 v Preface This study was conducted for Dr. Jeffrey Holland, Director of the Engineer Research and Development

  1. A Study of Secular and Tidal Tilt in Wyoming and Utah.

    DTIC Science & Technology

    1983-11-01

    block number) Tiltmeters , Earth Tides, Yellowstone Caldera, Finite-element models. S 20. ABSTRACT (Continue on reverse side It necessary end Identify...borehole tiltmeter design by measuring the tidal admittance at two sites near Boulder. We found good agreement between theory and experiment. and we...were encouraged to proceed with the construction and installation of an array of borehole tiltmeters in Yellowstone National Park. The primary purpose

  2. ANTARES: The first undersea neutrino telescope

    NASA Astrophysics Data System (ADS)

    Ageron, M.; Aguilar, J. A.; Al Samarai, I.; Albert, A.; Ameli, F.; André, M.; Anghinolfi, M.; Anton, G.; Anvar, S.; Ardid, M.; Arnaud, K.; Aslanides, E.; Assis Jesus, A. C.; Astraatmadja, T.; Aubert, J.-J.; Auer, R.; Barbarito, E.; Baret, B.; Basa, S.; Bazzotti, M.; Becherini, Y.; Beltramelli, J.; Bersani, A.; Bertin, V.; Beurthey, S.; Biagi, S.; Bigongiari, C.; Billault, M.; Blaes, R.; Bogazzi, C.; de Botton, N.; Bou-Cabo, M.; Boudahef, B.; Bouwhuis, M. C.; Brown, A. M.; Brunner, J.; Busto, J.; Caillat, L.; Calzas, A.; Camarena, F.; Capone, A.; Caponetto, L.; Cârloganu, C.; Carminati, G.; Carmona, E.; Carr, J.; Carton, P. H.; Cassano, B.; Castorina, E.; Cecchini, S.; Ceres, A.; Chaleil, Th.; Charvis, Ph.; Chauchot, P.; Chiarusi, T.; Circella, M.; Compère, C.; Coniglione, R.; Coppolani, X.; Cosquer, A.; Costantini, H.; Cottini, N.; Coyle, P.; Cuneo, S.; Curtil, C.; D'Amato, C.; Damy, G.; van Dantzig, R.; de Bonis, G.; Decock, G.; Decowski, M. P.; Dekeyser, I.; Delagnes, E.; Desages-Ardellier, F.; Deschamps, A.; Destelle, J.-J.; di Maria, F.; Dinkespiler, B.; Distefano, C.; Dominique, J.-L.; Donzaud, C.; Dornic, D.; Dorosti, Q.; Drogou, J.-F.; Drouhin, D.; Druillole, F.; Durand, D.; Durand, R.; Eberl, T.; Emanuele, U.; Engelen, J. J.; Ernenwein, J.-P.; Escoffier, S.; Falchini, E.; Favard, S.; Fehr, F.; Feinstein, F.; Ferri, M.; Ferry, S.; Fiorello, C.; Flaminio, V.; Folger, F.; Fritsch, U.; Fuda, J.-L.; Galatá, S.; Galeotti, S.; Gay, P.; Gensolen, F.; Giacomelli, G.; Gojak, C.; Gómez-González, J. P.; Goret, Ph.; Graf, K.; Guillard, G.; Halladjian, G.; Hallewell, G.; van Haren, H.; Hartmann, B.; Heijboer, A. J.; Heine, E.; Hello, Y.; Henry, S.; Hernández-Rey, J. J.; Herold, B.; Hößl, J.; Hogenbirk, J.; Hsu, C. C.; Hubbard, J. R.; Jaquet, M.; Jaspers, M.; de Jong, M.; Jourde, D.; Kadler, M.; Kalantar-Nayestanaki, N.; Kalekin, O.; Kappes, A.; Karg, T.; Karkar, S.; Karolak, M.; Katz, U.; Keller, P.; Kestener, P.; Kok, E.; Kok, H.; Kooijman, P.; Kopper, C.; Kouchner, A.; Kretschmer, W.; Kruijer, A.; Kuch, S.; Kulikovskiy, V.; Lachartre, D.; Lafoux, H.; Lagier, P.; Lahmann, R.; Lahonde-Hamdoun, C.; Lamare, P.; Lambard, G.; Languillat, J.-C.; Larosa, G.; Lavalle, J.; Le Guen, Y.; Le Provost, H.; Levansuu, A.; Lefèvre, D.; Legou, T.; Lelaizant, G.; Lévéque, C.; Lim, G.; Lo Presti, D.; Loehner, H.; Loucatos, S.; Louis, F.; Lucarelli, F.; Lyashuk, V.; Magnier, P.; Mangano, S.; Marcel, A.; Marcelin, M.; Margiotta, A.; Martinez-Mora, J. A.; Masullo, R.; Mazéas, F.; Mazure, A.; Meli, A.; Melissas, M.; Migneco, E.; Mongelli, M.; Montaruli, T.; Morganti, M.; Moscoso, L.; Motz, H.; Musumeci, M.; Naumann, C.; Naumann-Godo, M.; Neff, M.; Niess, V.; Nooren, G. J. L.; Oberski, J. E. J.; Olivetto, C.; Palanque-Delabrouille, N.; Palioselitis, D.; Papaleo, R.; Păvălaş, G. E.; Payet, K.; Payre, P.; Peek, H.; Petrovic, J.; Piattelli, P.; Picot-Clemente, N.; Picq, C.; Piret, Y.; Poinsignon, J.; Popa, V.; Pradier, T.; Presani, E.; Prono, G.; Racca, C.; Raia, G.; van Randwijk, J.; Real, D.; Reed, C.; Réthoré, F.; Rewiersma, P.; Riccobene, G.; Richardt, C.; Richter, R.; Ricol, J. S.; Rigaud, V.; Roca, V.; Roensch, K.; Rolin, J.-F.; Rostovtsev, A.; Rottura, A.; Roux, J.; Rujoiu, M.; Ruppi, M.; Russo, G. V.; Salesa, F.; Salomon, K.; Sapienza, P.; Schmitt, F.; Schöck, F.; Schuller, J.-P.; Schüssler, F.; Sciliberto, D.; Shanidze, R.; Shirokov, E.; Simeone, F.; Sottoriva, A.; Spies, A.; Spona, T.; Spurio, M.; Steijger, J. J. M.; Stolarczyk, Th.; Streeb, K.; Sulak, L.; Taiuti, M.; Tamburini, C.; Tao, C.; Tasca, L.; Terreni, G.; Tezier, D.; Toscano, S.; Urbano, F.; Valdy, P.; Vallage, B.; van Elewyck, V.; Vannoni, G.; Vecchi, M.; Venekamp, G.; Verlaat, B.; Vernin, P.; Virique, E.; de Vries, G.; van Wijk, R.; Wijnker, G.; Wobbe, G.; de Wolf, E.; Yakovenko, Y.; Yepes, H.; Zaborov, D.; Zaccone, H.; Zornoza, J. D.; Zúñiga, J.

    2011-11-01

    The ANTARES Neutrino Telescope was completed in May 2008 and is the first operational Neutrino Telescope in the Mediterranean Sea. The main purpose of the detector is to perform neutrino astronomy and the apparatus also offers facilities for marine and Earth sciences. This paper describes the design, the construction and the installation of the telescope in the deep sea, offshore from Toulon in France. An illustration of the detector performance is given.

  3. Environmental Analysis

    NASA Technical Reports Server (NTRS)

    1980-01-01

    Burns & McDonnell Engineering's environmental control study is assisted by NASA's Computer Software Management and Information Center's programs in environmental analyses. Company is engaged primarily in design of such facilities as electrical utilities, industrial plants, wastewater treatment systems, dams and reservoirs and aviation installations. Company also conducts environmental engineering analyses and advises clients as to the environmental considerations of a particular construction project. Company makes use of many COSMIC computer programs which have allowed substantial savings.

  4. 46 CFR 27.211 - What are the specifications for fuel systems on towing vessels whose construction was contracted...

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ...; and (2) Nonmetallic flexible hose is acceptable if it— (i) Is used in lengths of not more than 0.76... reinforced with wire braid; and (v) Either,— (A) If it is designed for use with compression fittings, is... clamps at each end of the hose. Clamps must not rely on spring tension and must be installed beyond the...

  5. 46 CFR 27.211 - What are the specifications for fuel systems on towing vessels whose construction was contracted...

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ...; and (2) Nonmetallic flexible hose is acceptable if it— (i) Is used in lengths of not more than 0.76... reinforced with wire braid; and (v) Either,— (A) If it is designed for use with compression fittings, is... clamps at each end of the hose. Clamps must not rely on spring tension and must be installed beyond the...

  6. 46 CFR 27.211 - What are the specifications for fuel systems on towing vessels whose construction was contracted...

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ...; and (2) Nonmetallic flexible hose is acceptable if it— (i) Is used in lengths of not more than 0.76... reinforced with wire braid; and (v) Either,— (A) If it is designed for use with compression fittings, is... clamps at each end of the hose. Clamps must not rely on spring tension and must be installed beyond the...

  7. 46 CFR 27.211 - What are the specifications for fuel systems on towing vessels whose construction was contracted...

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ...; and (2) Nonmetallic flexible hose is acceptable if it— (i) Is used in lengths of not more than 0.76... reinforced with wire braid; and (v) Either,— (A) If it is designed for use with compression fittings, is... clamps at each end of the hose. Clamps must not rely on spring tension and must be installed beyond the...

  8. Meeting the Challenge of Installing Canes During New Ship Construction on LPD 28

    DTIC Science & Technology

    2015-03-01

    components making up the SWAN are enclosed in Raytheon-designed hardware systems that meet Military Specification MIL-S-901D Grade B shock...Connected Connected Connected, NRE Connected, Engr Control Sys (ECS), Integrated to segreg; tte NREto Condition Assmt Sys (I CAS) SWAN develop HM&E...Hull Mecllanical & Electrical (HM&E) - COA Connected NA Connected Connected, NRE Connected, Damage Control Action Management Dependent to segreg; tte

  9. The photomultiplier tube calibration system of the MicroBooNE experiment

    DOE PAGES

    Conrad, J.; Jones, B. J. P.; Moss, Z.; ...

    2015-06-03

    Here, we report on the design and construction of a LED-based fiber calibration system for large liquid argon time projection detectors. This system was developed to calibrate the optical systems of the MicroBooNE experiment. As well as detailing the materials and installation procedure, we provide technical drawings and specifications so that the system may be easily replicated in future LArTPC detectors.

  10. Building information models for astronomy projects

    NASA Astrophysics Data System (ADS)

    Ariño, Javier; Murga, Gaizka; Campo, Ramón; Eletxigerra, Iñigo; Ampuero, Pedro

    2012-09-01

    A Building Information Model is a digital representation of physical and functional characteristics of a building. BIMs represent the geometrical characteristics of the Building, but also properties like bills of quantities, definition of COTS components, status of material in the different stages of the project, project economic data, etc. The BIM methodology, which is well established in the Architecture Engineering and Construction (AEC) domain for conventional buildings, has been brought one step forward in its application for Astronomical/Scientific facilities. In these facilities steel/concrete structures have high dynamic and seismic requirements, M&E installations are complex and there is a large amount of special equipment and mechanisms involved as a fundamental part of the facility. The detail design definition is typically implemented by different design teams in specialized design software packages. In order to allow the coordinated work of different engineering teams, the overall model, and its associated engineering database, is progressively integrated using a coordination and roaming software which can be used before starting construction phase for checking interferences, planning the construction sequence, studying maintenance operation, reporting to the project office, etc. This integrated design & construction approach will allow to efficiently plan construction sequence (4D). This is a powerful tool to study and analyze in detail alternative construction sequences and ideally coordinate the work of different construction teams. In addition engineering, construction and operational database can be linked to the virtual model (6D), what gives to the end users a invaluable tool for the lifecycle management, as all the facility information can be easily accessed, added or replaced. This paper presents the BIM methodology as implemented by IDOM with the E-ELT and ATST Enclosures as application examples.

  11. Dynamic Simulation on the Installation Process of HGIS in Transformer Substation

    NASA Astrophysics Data System (ADS)

    Lin, Tao; Li, Shaohua; Wang, Hu; Che, Deyong; Qi, Guangcai; Yao, Jianfeng; Zhang, Qingzhe

    The technological requirements of Hypid Gas Insulated Switchgear (HGIS) installation in transformer substation is high and the control points of quality is excessive. Most of the engineers and technicians in the construction enterprises are not familiar with equipments of HGIS. In order to solve these problem, equipments of HGIS is modeled on the computer by SolidWorks software. Installation process of civil foundation and closed-type equipments is optimized dynamically with virtual assemble technology. Announcements and application work are composited into animation file. Skills of modeling and simulation is tidied classify as well. The result of the visual dynamic simulation can instruct the actual construction process of HGIS to a certain degree and can promote reasonable construction planning and management. It can also improve the method and quality of staff training for electric power construction enterprises.

  12. 47 CFR 73.1692 - Broadcast station construction near or installation on an AM broadcast tower.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... the indirect method (see § 73.51). Upon the completion of the installation, antenna impedance... completion of construction, antenna impedance measurements of the AM station shall be made. In addition... simultaneously with the filing of the application for license to cover this permit, the results of the impedance...

  13. 47 CFR 73.1692 - Broadcast station construction near or installation on an AM broadcast tower.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... the indirect method (see § 73.51). Upon the completion of the installation, antenna impedance... completion of construction, antenna impedance measurements of the AM station shall be made. In addition... simultaneously with the filing of the application for license to cover this permit, the results of the impedance...

  14. Cities with camera-equipped taxicabs experience reduced taxicab driver homicide rates: United States, 1996-2010.

    PubMed

    Menéndez, Cammie Chaumont; Amandus, Harlan; Damadi, Parisa; Wu, Nan; Konda, Srinivas; Hendricks, Scott

    2014-05-01

    Driving a taxicab remains one of the most dangerous occupations in the United States, with leading homicide rates. Although safety equipment designed to reduce robberies exists, it is not clear what effect it has on reducing taxicab driver homicides. Taxicab driver homicide crime reports for 1996 through 2010 were collected from 20 of the largest cities (>200,000) in the United States: 7 cities with cameras installed in cabs, 6 cities with partitions installed, and 7 cities with neither cameras nor partitions. Poisson regression modeling using generalized estimating equations provided city taxicab driver homicide rates while accounting for serial correlation and clustering of data within cities. Two separate models were constructed to compare (1) cities with cameras installed in taxicabs versus cities with neither cameras nor partitions and (2) cities with partitions installed in taxicabs versus cities with neither cameras nor partitions. Cities with cameras installed in cabs experienced a significant reduction in homicides after cameras were installed (adjRR = 0.11, CL 0.06-0.24) and compared to cities with neither cameras nor partitions (adjRR = 0.32, CL 0.15-0.67). Cities with partitions installed in taxicabs experienced a reduction in homicides (adjRR = 0.78, CL 0.41-1.47) compared to cities with neither cameras nor partitions, but it was not statistically significant. The findings suggest cameras installed in taxicabs are highly effective in reducing homicides among taxicab drivers. Although not statistically significant, the findings suggest partitions installed in taxicabs may be effective.

  15. The Muon Portal Project: Design and construction of a scanning portal based on muon tomography

    NASA Astrophysics Data System (ADS)

    Antonuccio, V.; Bandieramonte, M.; Becciani, U.; Bonanno, D. L.; Bonanno, G.; Bongiovanni, D.; Fallica, P. G.; Garozzo, S.; Grillo, A.; La Rocca, P.; Leonora, E.; Longhitano, F.; Lo Presti, D.; Marano, D.; Parasole, O.; Pugliatti, C.; Randazzo, N.; Riggi, F.; Riggi, S.; Romeo, G.; Romeo, M.; Russo, G. V.; Santagati, G.; Timpanaro, M. C.; Valvo, G.

    2017-02-01

    Cosmic ray tomography is a technique which exploits the multiple Coulomb scattering of highly penetrating cosmic ray-produced muons to perform non-destructive inspection of high-Z materials without the use of artificial radiation. A muon tomography detection system can be used as a portal monitor at border crossing points for detecting illegal targeted objects. The Muon Portal Project is a joint initiative between Italian research and industrial partners, aimed at the construction of a real size detector prototype (6×3×7 m3) for the inspection of cargo containers by the muon scattering technique. The detector consists of four XY tracking planes, two placed above and two below the container to be inspected. After a research and development phase, which led to the choice and test of the individual components, the construction and installation of the detection modules is almost completed. In this paper the present status of the Project is reported, focusing on the design and construction phase, as well as on the preliminary results obtained with the first detection planes.

  16. Building America Case Study: Design Guidance for Passive Vents in New Construction Multifamily Buildings, New York, New York

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    2016-02-01

    This document addresses the use of passive vents as a source of outdoor air in multifamily buildings. The challenges associated with implementing passive vents and the factors affecting performance are outlined. A comprehensive design methodology and quantified performance metrics are provided. Two hypothetical design examples are provided to illustrate the process. This document is intended to be useful to designers, decision-makers, and contractors implementing passive ventilation strategies. It is also intended to be a resource for those responsible for setting high-performance building program requirements, especially pertaining to ventilation and outdoor air. To ensure good indoor air quality, a dedicated sourcemore » of outdoor air is an integral part of high-performance buildings. Presently, there is a lack of guidance pertaining to the design and installation of passive vents, resulting in poor system performance. This report details the criteria necessary for designing, constructing, and testing passive vent systems to enable them to provide consistent and reliable levels of ventilation air from outdoors.« less

  17. FIELD STUDIES OF GEOMEMBRANE INSTALLATION TECHNIQUES

    EPA Science Inventory

    Fourteen construction sites where geomembranes were being installed were visited to observe subgrade preparation and liner installation techniques. These sites were visited during a study conducted for the U.S. EPA, Solid and Hazardous Waste Research Division. The sites included ...

  18. 29 CFR 1926.402 - Applicability.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... installations used for the generation, transmission, and distribution of electric energy, including related...) SAFETY AND HEALTH REGULATIONS FOR CONSTRUCTION Electrical Installation Safety Requirements § 1926.402... electrical equipment and installations used to provide electric power and light at the jobsite. These...

  19. 29 CFR 1926.402 - Applicability.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... installations used for the generation, transmission, and distribution of electric energy, including related...) SAFETY AND HEALTH REGULATIONS FOR CONSTRUCTION Electrical Installation Safety Requirements § 1926.402... electrical equipment and installations used to provide electric power and light at the jobsite. These...

  20. A Versatile Bioorthogonal Copper-free Click Chemistry Platform to Functionalize Cisplatin Prodrugs

    PubMed Central

    Pathak, Rakesh K.; McNitt, Christopher D.; Popik, Vladimir V.; Dhar, Shanta

    2015-01-01

    The ability to rationally design and construct a platform technology to develop new platinum(IV) [Pt(IV)] prodrugs with functionalities for installation of targeting moieties, delivery systems, fluorescent reporters from a single precursor with the ability to release biologically active cisplatin using well-defined chemistry is critical for discovering new platinum-based therapeutics. With limited numbers of possibilities by considering the sensitivity of Pt(IV) centers to reduction, thiols, etc, we used a strain promoted azide alkyne cycloaddition (SPAAC) approach to provide a novel platform where new functionalities can easily be installed on cisplatin prodrugs from a single Pt(IV) precursor. The ability of this platform to be incorporated in nano-delivery vehicle and conjugation to fluorescent reporters were also investigated. PMID:24756923

  1. Copper-free click-chemistry platform to functionalize cisplatin prodrugs.

    PubMed

    Pathak, Rakesh K; McNitt, Christopher D; Popik, Vladimir V; Dhar, Shanta

    2014-06-02

    The ability to rationally design and construct a platform technology to develop new platinum(IV) [Pt(IV)] prodrugs with functionalities for installation of targeting moieties, delivery systems, fluorescent reporters from a single precursor with the ability to release biologically active cisplatin by using well-defined chemistry is critical for discovering new platinum-based therapeutics. With limited numbers of possibilities considering the sensitivity of Pt(IV) centers, we used a strain-promoted azide-alkyne cycloaddition approach to provide a platform, in which new functionalities can easily be installed on cisplatin prodrugs from a single Pt(IV) precursor. The ability of this platform to be incorporated in nanodelivery vehicle and conjugation to fluorescent reporters were also investigated. © 2014 WILEY-VCH Verlag GmbH & Co. KGaA, Weinheim.

  2. HVAC--the importance of clean intake section and dry air filter in cold climate.

    PubMed

    Hanssen, S O

    2004-01-01

    HVAC systems, if properly designed, installed, operated and maintained, will improve thermal conditions and air quality indoors. However, the success strongly depends on the design of the system and the quality of the components we use in our HVAC installations. Regrettably, several investigations have revealed that many HVAC installations have a lot of operational and maintenance problems, especially related to moisture, rain and snow entrainment. In short, it seems that too little attention is placed on the design of the intake section, despite the fact that there exists a large number of national and international guidelines and recommendations. This is a serious problem because the air intake is the initial component of the ventilation plant and as such the first line of defense against debris and other outdoor air pollutants. Unfortunately, the design is often an argued compromise between the architect, the civil engineer and the HVAC engineer. In the future, the technical, hygienic and microbiological feature of air intakes must be better ensured in order to avoid the air intake becoming a risk component as regards contamination and indoor air quality. Further, it seems that the magnitude of the problem is not well known, or recognized, by the building designers, engineers and professionals involved in the construction and operation of buildings. This fact needs to be addressed more seriously, because obviously there is a big difference between the idealistic architectonic design, engineering intentions and the real life situation. Several practical recommendations for design and operation of HVAC systems are presented. Following the recommendations will result in less pollution from the HVAC-system and increased indoor environmental quality.

  3. Status of high temperature superconductor cable and fault current limiter projects at American Superconductor

    NASA Astrophysics Data System (ADS)

    Maguire, J. F.; Yuan, J.

    2009-10-01

    This paper will describe the status of three key programs currently underway at American Superconductor Corp. The first program is the LIPA project which is a transmission voltage high temperature superconducting cable program, with funding support from the US Department of Energy. The 600 m cable, capable of carrying 574 MVA, was successfully installed and commissioned in LIPA grid on April 22, 2008. An overview of the project, system level design details and operational data will be provided. In addition, the status of the newly awarded LIPA II project will be described. The second program is Project Hydra, with funding support from the US Department of Homeland Security, to design, develop and demonstrate an HTS cable with fault current limiting functionality. The cable is 300 m long and is being designed to carry 96 MVA at a distribution level voltage of 13.8 kV. The cable will be permanently installed and energized in Manhattan, New York in 2010. The initial status of Project Hydra will be presented. The final program to be discussed is a transmission voltage, high temperature superconducting fault current limiter funded by the US DOE. The project encompasses the design, construction and test of a 115 kV FCL for power transmission within a time frame of 4-5 years. Installation and testing are planned for a Southern California Edison substation. A project overview and progress under the first phase will be reported.

  4. 29 CFR 1926.402 - Applicability.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ...) SAFETY AND HEALTH REGULATIONS FOR CONSTRUCTION Electrical Installation Safety Requirements § 1926.402... electrical equipment and installations used to provide electric power and light at the jobsite. These... commenced. Note: If the electrical installation is made in accordance with the National Electrical Code ANSI...

  5. Structures and construction of nuclear power plants on lunar surface

    NASA Astrophysics Data System (ADS)

    Shimizu, Katsunori; Kobatake, Masuhiko; Ogawa, Sachio; Kanamori, Hiroshi; Okada, Yasuhiko; Mano, Hideyuki; Takagi, Kenji

    1991-07-01

    The best structure and construction techniques of nuclear power plants in the severe environments on the lunar surface are studied. Facility construction types (functional conditions such as stable structure, shield thickness, maintainability, safety distances, and service life), construction conditions (such as construction methods, construction equipment, number of personnel, time required for construction, external power supply, and required transportation) and construction feasibility (construction method, reactor transportation between the moon and the earth, ground excavation for installation, loading and unloading, transportation, and installation, filling up the ground, electric power supply of plant S (300 kW class) and plant L (3000 kW class)) are outlined. Items to pay attention to in construction are (1) automation and robotization of construction; (2) cost reduction by multi functional robots; and (3) methods of supplying power to robots. A precast concrete block manufacturing plant is also outlined.

  6. 24 CFR 3286.411 - Certifying installation.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... manufactured home has been installed in accordance with: (i) An installation design and instructions that have... URBAN DEVELOPMENT MANUFACTURED HOME INSTALLATION PROGRAM Installer Responsibilities of Installation in...; or (ii) An installation design and instructions that have been prepared and certified by a...

  7. Development of a compact HTS lead unit for the SC correction coils of the SuperKEKB final focusing magnet system

    NASA Astrophysics Data System (ADS)

    Zong, Zhanguo; Ohuchi, Norihito; Tsuchiya, Kiyosumi; Arimoto, Yasushi

    2016-09-01

    Forty-three superconducting (SC) correction coils with maximum currents of about 60 A are installed in the SuperKEKB final focusing magnet system. Current leads to energize the SC correction coils should have an affordable heat load and fit the spatial constraints in the service cryostat where the current leads are installed. To address the requirements, design optimization of individual lead was performed with vapor cooled current lead made of a brass material, and a compact unit was designed to accommodate eight current leads together in order to be installed with one port in the service cryostat. The 2nd generation high temperature SC (HTS) tape was adopted and soldered at the cold end of the brass current lead to form a hybrid HTS lead structure. A prototype of the compact lead unit with HTS tape was constructed and tested with liquid helium (LHe) environment. This paper presents a cryogenic measurement system to simulate the real operation conditions in the service cryostat, and analysis of the experimental results. The measured results showed excellent agreement with the theoretical analysis and numerical simulation. In total, 11 sets of the compact HTS lead units were constructed for the 43 SC correction coils at KEK. One set from the mass production was tested in cryogenic conditions, and exhibited the same performance as the prototype. The compact HTS lead unit can feed currents to four SC correction coils simultaneously with the simple requirement of controlling and monitoring helium vapor flow, and has a heat load of about 0.762 L/h in terms of LHe consumption.

  8. Dendrometer bands made easy: using modified cable ties to measure incremental growth of trees

    USGS Publications Warehouse

    Anemaet, Evelyn R.; Middleton, Beth A.

    2013-01-01

    Dendrometer bands are a useful way to make sequential repeated measurements of tree growth, but traditional dendrometer bands can be expensive, time consuming, and difficult to construct in the field. An alternative to the traditional method of band construction is to adapt commercially available materials. This paper describes how to construct and install dendrometer bands using smooth-edged, stainless steel, cable tie banding and attachable rollerball heads. As a performance comparison, both traditional and cable tie dendrometer bands were installed on baldcypress trees at the National Wetlands Research Center in Lafayette, Louisiana, by both an experienced and a novice worker. Band installation times were recorded, and growth of the trees as estimated by the two band types was measured after approximately one year, demonstrating equivalence of the two methods. This efficient approach to dendrometer band construction can help advance the knowledge of long-term tree growth in ecological studies.

  9. The methodic of calculation for the need of basic construction machines on construction site when developing organizational and technological documentation

    NASA Astrophysics Data System (ADS)

    Zhadanovsky, Boris; Sinenko, Sergey

    2018-03-01

    Economic indicators of construction work, particularly in high-rise construction, are directly related to the choice of optimal number of machines. The shortage of machinery makes it impossible to complete the construction & installation work on scheduled time. Rates of performance of construction & installation works and labor productivity during high-rise construction largely depend on the degree of provision of construction project with machines (level of work mechanization). During calculation of the need for machines in construction projects, it is necessary to ensure that work is completed on scheduled time, increased level of complex mechanization, increased productivity and reduction of manual work, and improved usage and maintenance of machine fleet. The selection of machines and determination of their numbers should be carried out by using formulas presented in this work.

  10. Innovation in Building Design

    NASA Technical Reports Server (NTRS)

    1983-01-01

    Thomas & Betts Corporation's Flat Conductor Cables, or FCC, were developed of necessity as aircraft and spacecraft became increasingly complex. In order to reduce size and weight of components, the use of thin flat wire instead of relatively thick and protrusive round cable, provided a dramatic reduction of the space occupied by the many miles of power distribution lines in an aerospace vehicle. Commercially, FCC offers cost savings in simplified building construction, reduced installation time and ease of alteration.

  11. Installation of a second superconducting wiggler at SAGA-LS

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kaneyasu, T., E-mail: kaneyasu@saga-ls.jp; Takabayashi, Y.; Iwasaki, Y.

    The SAGA Light Source is a synchrotron radiation facility consisting of a 255 MeV injector linac and a 1.4 GeV storage ring with a circumference of 75.6 m. A superconducting wiggler (SCW) with a peak magnetic field of 4 T has been routinely operating for generating hard X-rays since its installation in 2010. In light of this success, it was decided to install a second SCW as a part of the beamline construction by Sumitomo Electric Industries. To achieve this, machine modifications including installation of a new magnet power supply, improvement of the magnet control system, and replacement of themore » vacuum chambers in the storage ring were carried out. Along with beamline construction, installation and commissioning of the second SCW are scheduled to take place in 2015.« less

  12. Constructed Pools-and-Riffles: Application and Assessment in Illinois.

    NASA Astrophysics Data System (ADS)

    Day, D. M.; Dodd, H. R.; Carney, D. A.; Holtrop, A. M.; Whiles, M. R.; White, B.; Roseboom, D.; Kinney, W.; Keefer, L. L.; Beardsley, J.

    2005-05-01

    The diversity of Illinois' streams provides a broad range of conditions, and thus a variety of restoration techniques may be required to adequately compensate for watershed alterations. Resource management agencies and research institutions in the state have collaborated on a variety of applied research initiatives to assess the efficacy of various stream protection and restoration techniques. Constructed pool-and-riffle structures have received significant attention because they tend to address watershed processes (i.e., channel evolution model) and may benefit biotic communities and processes along with physical habitat. Constructed pools-and-riffles have been applied primarily to address geomorphic instability, yet understanding biological responses can provide further rationale for their use and design specifications. In three stream systems around the state, fish were collected pre- and post- installation of structures, using primarily electrofishing techniques (e.g., electric seine & backpack). In general, within the first five years after installation, changes in fish communities have included a shift from high-abundance, small cyprinid-dominated assemblages to low-density Centrarchidae and Catostomidae assemblages. Changes in macro invertebrates at selected sites included increases in filter feeders and sensitive taxa such as the Ephemeroptera, Plecoptera, and Trichoptera (EPT). Ongoing assessments will be critical for understanding long-term influences on stream ecosystem structure and function.

  13. 24 CFR 3286.111 - Installer certification of installation.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... manufactured home has been installed in accordance with: (i) An installation design and instructions that have... HOUSING AND URBAN DEVELOPMENT MANUFACTURED HOME INSTALLATION PROGRAM Certification of Installation in HUD...; or (ii) An installation design and instructions that have been prepared and certified by a...

  14. Laboratory and Industrial Ventilation

    NASA Technical Reports Server (NTRS)

    1972-01-01

    This handbook supplements the Facilities Engineering Handbook (NHB 7320.1) and provides additional policies and criteria for uniform application to ventilation systems. It expands basic requirements, provides additional design and construction guidance, and places emphasis on those design considerations which will provide for greater effectiveness in the use of these systems. The provisions of this handbook are applicable to all NASA field installations and the Jet Propulsion Laboratory. Since supply of this handbook is limited, abstracts of the portion or portions applicable to a given requirement will be made for the individual specific needs encountered rather than supplying copies of the handbook as has been past practice.

  15. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Dougan, P.M.

    During the year, design, construction and installation of all project equipment was completed, and continuous steam injection began on September 18, 1979 and continued until February 29, 1980. In the five-month period of steam injection, 235,060 barrels of water as steam at an average wellhead pressure of 1199 psig and an average wellhead temperature of 456/sup 0/F were injected into the eight project injection wells. Operation of the project at design temperature and pressure (1000/sup 0/F and 1500 psig) was not possible due to continuing problems with surface equipment. Environmental monitoring at the project site continued during startup and operation.

  16. The Land-Use Efficiency of Big Solar

    NASA Astrophysics Data System (ADS)

    Hernandez, R. R.; Hoffacker, M.; Field, C. B.

    2013-12-01

    As utility-scale solar energy (USSE) systems increase in size and numbers globally, there is a growing interest in understanding environmental interactions between solar energy development and land-use decisions. Maximizing the efficient use of land for USSE is one of the major challenges in realizing the full potential of solar energy, however, the land-use efficiency (LUE; Wm-2) of USSE remains unknown. We quantified the nominal LUE of 183 USSE installations (> 20 megawatts; planned, under construction, and operating) using California as a case study. In California, we found that USSE installations are concentrated in the Central Valley and desert interior of southern California and have a LUE of 35.01 Wm-2. The installations comprise approximately 86,000 hectares (ha) and more land is allocated for photovoltaic schemes (72,294 ha) than for concentrating solar power (13,604 ha). Photovoltaic installations are greater in abundance (93%) than concentrating solar power, but technology type and nameplate capacity has no impact on LUE. More USSE installations are on private land (80%) and have a significantly greater LUE (35.83 Wm-2) than installations on public land (25.42 Wm-2). We show how LUE can be improved and how co-benefit opportunities can be integrated with USSE enterprises to maximize their economic, energetic, and environmental returns on investment. (Left) The distribution of utility-scale solar energy installations in California (constructed and in progress) by technology type: concentrating solar power and photovoltaic with county lines shown. (Right) The distribution of utility-scale solar energy installations in California (constructed and in progress) by location: public or privately owned land. Larger capacity installations (megawatts) have relatively greater point size.

  17. Detection and localization of building insulation faults using optical-fiber DTS system

    NASA Astrophysics Data System (ADS)

    Papes, Martin; Liner, Andrej; Koudelka, Petr; Siska, Petr; Cubik, Jakub; Kepak, Stanislav; Jaros, Jakub; Vasinek, Vladimir

    2013-05-01

    Nowadays the trends in the construction industry are changing at an incredible speed. The new technologies are still emerging on the market. Sphere of building insulation is not an exception as well. One of the major problems in building insulation is usually its failure, whether caused by unwanted mechanical intervention or improper installation. The localization of these faults is quite difficult, often impossible without large intervention into the construction. As a proper solution for this problem might be utilization of Optical-Fiber DTS system based on stimulated Raman scattering. Used DTS system is primary designed for continuous measurement of the temperature along the optical fiber. This system is using standard optical fiber as a sensor, which brings several advantages in its application. First, the optical fiber is relatively inexpensive, which allows to cover a quite large area for a small cost. The other main advantages of the optical fiber are electromagnetic resistance, small size, safety operation in inflammable or explosive area, easy installation, etc. This article is dealing with the detection and localization of building insulation faults using mentioned system.

  18. Developments in the safe design of LNG tanks

    NASA Astrophysics Data System (ADS)

    Fulford, N. J.; Slatter, M. D.

    The objective of this paper is to discuss how the gradual development of design concepts for liquefied natural gas (LNG) storage systems has helped to enhance storage safety and economy. The experience in the UK is compared with practice in other countries with similar LNG storage requirements. Emphasis is placed on the excellent record of safety and reliability exhibited by tanks with a primary metal container designed and constructed to approved standards. The work carried out to promote the development of new materials, fire protection, and monitoring systems for use in LNG storage is also summarized, and specific examples described from British Gas experience. Finally, the trends in storage tank design world-wide and options for future design concepts are discussed, bearing in mind planned legislation and design codes governing hazardous installations.

  19. 7 CFR Exhibit B-2 to Subpart I of... - Breakdown of Construction Development for Determining Percentage Construction Completed

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... concrete, usually reinforced, poured over gravel and a vapor barrier with perimeter insulation to prevent heat loss. 4. Subflooring 0 1 1 The installation of materials used for flooring that is laid directly..., and before the insulation is placed in the walls and ceiling. 14. Insulation 2 2 2 The installation of...

  20. 7 CFR Exhibit B-2 to Subpart I of... - Breakdown of Construction Development for Determining Percentage Construction Completed

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... concrete, usually reinforced, poured over gravel and a vapor barrier with perimeter insulation to prevent heat loss. 4. Subflooring 0 1 1 The installation of materials used for flooring that is laid directly..., and before the insulation is placed in the walls and ceiling. 14. Insulation 2 2 2 The installation of...

  1. 7 CFR Exhibit B-2 to Subpart I of... - Breakdown of Construction Development for Determining Percentage Construction Completed

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... concrete, usually reinforced, poured over gravel and a vapor barrier with perimeter insulation to prevent heat loss. 4. Subflooring 0 1 1 The installation of materials used for flooring that is laid directly..., and before the insulation is placed in the walls and ceiling. 14. Insulation 2 2 2 The installation of...

  2. 7 CFR Exhibit B-2 to Subpart I of... - Breakdown of Construction Development for Determining Percentage Construction Completed

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... concrete, usually reinforced, poured over gravel and a vapor barrier with perimeter insulation to prevent heat loss. 4. Subflooring 0 1 1 The installation of materials used for flooring that is laid directly..., and before the insulation is placed in the walls and ceiling. 14. Insulation 2 2 2 The installation of...

  3. 7 CFR Exhibit B-2 to Subpart I of... - Breakdown of Construction Development for Determining Percentage Construction Completed

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... concrete, usually reinforced, poured over gravel and a vapor barrier with perimeter insulation to prevent heat loss. 4. Subflooring 0 1 1 The installation of materials used for flooring that is laid directly..., and before the insulation is placed in the walls and ceiling. 14. Insulation 2 2 2 The installation of...

  4. OCONUS Compliance Assessment Protocols Air Force Supplement

    DTIC Science & Technology

    2009-09-01

    that have environmental impacts (i.e., construction, mission changes, process/activity changes). Are environmental surveys and construction site...how and where does disposal occur? Has the installation conducted a complete asbestos survey ? If yes, what the date of the most recent... survey ? (Please provide a copy for the assessment team.) Has the installation prepared, coordinated, and executed an Asbestos Management Plan

  5. Continuous-flow stirred-tank reactor 20-L demonstration test: Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lee, D.D.; Collins, J.L.

    One of the proposed methods of removing the cesium, strontium, and transuranics from the radioactive waste storage tanks at Savannah River is the small-tank tetraphenylborate (TPB) precipitation process. A two-reactor-in-series (15-L working volume each) continuous-flow stirred-tank reactor (CSTR) system was designed, constructed, and installed in a hot cell to test the Savannah River process. The system also includes two cross-flow filtration systems to concentrate and wash the slurry produced in the process, which contains the bulk of radioactivity from the supernatant processed through the system. Installation, operational readiness reviews, and system preparation and testing were completed. The first test usingmore » the filtration systems, two CSTRs, and the slurry concentration system was conducted over a 61-h period with design removal of Cs, Sr, and U achieved. With the successful completion of Test 1a, the following tests, 1b and 1c, were not required.« less

  6. Analysis of edge density fluctuation measured by trial KSTAR beam emission spectroscopy systema)

    NASA Astrophysics Data System (ADS)

    Nam, Y. U.; Zoletnik, S.; Lampert, M.; Kovácsik, Á.

    2012-10-01

    A beam emission spectroscopy (BES) system based on direct imaging avalanche photodiode (APD) camera has been designed for Korea Superconducting Tokamak Advanced Research (KSTAR) and a trial system has been constructed and installed for evaluating feasibility of the design. The system contains two cameras, one is an APD camera for BES measurement and another is a fast visible camera for position calibration. Two pneumatically actuated mirrors were positioned at front and rear of lens optics. The front mirror can switch the measurement between edge and core region of plasma and the rear mirror can switch between the APD and the visible camera. All systems worked properly and the measured photon flux was reasonable as expected from the simulation. While the measurement data from the trial system were limited, it revealed some interesting characteristics of KSTAR plasma suggesting future research works with fully installed BES system. The analysis result and the development plan will be presented in this paper.

  7. 46 CFR 129.200 - Design, installation, and maintenance.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 4 2014-10-01 2014-10-01 false Design, installation, and maintenance. 129.200 Section 129.200 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) OFFSHORE SUPPLY VESSELS ELECTRICAL INSTALLATIONS General Requirements § 129.200 Design, installation, and maintenance. Electrical equipment on a vessel must be designed,...

  8. 46 CFR 129.200 - Design, installation, and maintenance.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 4 2012-10-01 2012-10-01 false Design, installation, and maintenance. 129.200 Section 129.200 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) OFFSHORE SUPPLY VESSELS ELECTRICAL INSTALLATIONS General Requirements § 129.200 Design, installation, and maintenance. Electrical equipment on a vessel must be designed,...

  9. The impact of photovoltaic (PV) installations on downwind particulate matter concentrations: Results from field observations at a 550-MWAC utility-scale PV plant.

    PubMed

    Ravikumar, Dwarakanath; Sinha, Parikhit

    2017-10-01

    With utility-scale photovoltaic (PV) projects increasingly developed in dry and dust-prone geographies with high solar insolation, there is a critical need to analyze the impacts of PV installations on the resulting particulate matter (PM) concentrations, which have environmental and health impacts. This study is the first to quantify the impact of a utility-scale PV plant on PM concentrations downwind of the project site. Background, construction, and post-construction PM 2.5 and PM 10 (PM with aerodynamic diameters <2.5 and <10 μm, respectively) concentration data were collected from four beta attenuation monitor (BAM) stations over 3 yr. Based on these data, the authors evaluate the hypothesis that PM emissions from land occupied by a utility-scale PV installation are reduced after project construction through a wind-shielding effect. The results show that the (1) confidence intervals of the mean PM concentrations during construction overlap with or are lower than background concentrations for three of the four BAM stations; and (2) post-construction PM 2.5 and PM 10 concentrations downwind of the PV installation are significantly lower than the background concentrations at three of the four BAM stations. At the fourth BAM station, downwind post-construction PM 2.5 and PM 10 concentrations increased marginally by 5.7% and 2.6% of the 24-hr ambient air quality standards defined by the U.S. Environmental Protection Agency, respectively, when compared with background concentrations, with the PM 2.5 increase being statistically insignificant. This increase may be due to vehicular emissions from an access road near the southwest corner of the site or a drainage berm near the south station. The findings demonstrate the overall environmental benefit of downwind PM emission abatement from a utility-scale PV installation in desert conditions due to wind shielding. With PM emission reductions observed within 10 months of completion of construction, post-construction monitoring of downwind PM levels may be reduced to a 1-yr period for other projects with similar soil and weather conditions. This study is the first to analyze impact of a utility photovoltaic (PV) project on downwind particulate matter (PM) concentration in desert conditions. The PM data were collected at four beta attenuation monitor stations over a 3-yr period. The post-construction PM concentrations are lower than background concentrations at three of four stations, therefore supporting the hypothesis of post-construction wind shielding from PV installations. With PM emission reductions observed within 10 months of completion of construction, postconstruction monitoring of downwind PM levels may be reduced to a 1-yr period for other PV projects with similar soil and weather conditions.

  10. Automated assembly in space

    NASA Technical Reports Server (NTRS)

    Srivastava, Sandanand; Dwivedi, Suren N.; Soon, Toh Teck; Bandi, Reddy; Banerjee, Soumen; Hughes, Cecilia

    1989-01-01

    The installation of robots and their use of assembly in space will create an exciting and promising future for the U.S. Space Program. The concept of assembly in space is very complicated and error prone and it is not possible unless the various parts and modules are suitably designed for automation. Certain guidelines are developed for part designing and for an easy precision assembly. Major design problems associated with automated assembly are considered and solutions to resolve these problems are evaluated in the guidelines format. Methods for gripping and methods for part feeding are developed with regard to the absence of gravity in space. The guidelines for part orientation, adjustments, compliances and various assembly construction are discussed. Design modifications of various fasteners and fastening methods are also investigated.

  11. Energy utilization: municipal waste incineration. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    LaBeck, M.F.

    An assessment is made of the technical and economical feasibility of converting municipal waste into useful and useable energy. The concept presented involves retrofitting an existing municipal incinerator with the systems and equipment necessary to produce process steam and electric power. The concept is economically attractive since the cost of necessary waste heat recovery equipment is usually a comparatively small percentage of the cost of the original incinerator installation. Technical data obtained from presently operating incinerators designed specifically for generating energy, documents the technical feasibility and stipulates certain design constraints. The investigation includes a cost summary; description of process andmore » facilities; conceptual design; economic analysis; derivation of costs; itemized estimated costs; design and construction schedule; and some drawings.« less

  12. Design and Fabrication of the Lithium Tokamak Experiment

    NASA Astrophysics Data System (ADS)

    Kozub, Thomas; Majeski, Richard; Kaita, Robert; Priniski, Craig; Zakharov, Leonid

    2006-10-01

    The design objective of the lithium tokamak experiment (LTX) is to investigate the equilibrium and stability of tokamak discharges with near-zero recycling. The construction of LTX incorporates the conversion of the existing current drive experiment (CDX) vessel into one with a nearly complete plasma facing surface of liquid lithium This paper will describe the design, fabrication, and installation activities required to convert CDX into LTX. The most significant new feature is the addition of a plasma facing liner on a shell that will be operated at 300 C to 400 C and covered with an evaporated layer of liquid lithium. The shell has been fabricated in-house from explosively bonded stainless steel on copper to a rather unique geometry to match the outer flux surface. Other significant device modifications include the construction of a new ohmic heating power system, rebuilding of the vacuum vessel, new lithium evaporators, additional diagnostics, modifications to the poloidal field coil geometry and their associated power supplies. Details on the progress of this conversion will be reported.

  13. A Simulation Study on a Single-Unit Wireless EEG Sensor

    PubMed Central

    Luan, Bo; Sun, Mingui

    2015-01-01

    Traditional EEG systems are limited when utilized in point-of-care applications due to its immobility and tedious preparation procedures. We are designing a novel device named single-unit wireless EEG sensor to solve these problems. The sensor has a size similar to a U.S. penny. Four electrodes are installed within a 20mm diameter cylinder. It can be applied to scalp in seconds to amplify, digitize and wirelessly transmit EEG. Before the design and construction of an actual sensor, in this paper, we perform a set of simulations to quantitatively study: 1) can the sensor acquire EEG reliably? 2) will the selection of sensor orientation be an important factor to influence signal strength? Our results demonstrate positive answers to these questions. Moreover, the signal sensor acquired appears to be comparable to the signal from the standard 10-20 system. These results warrant the further design and construction of a single-unit wireless EEG sensor. PMID:26207084

  14. Ultrasonic humidification for telecommunications

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Longo, F.

    1994-03-01

    This article examines two installations which demonstrate that ultrasonic humidification is an excellent option for large-scale commercial installations. Many existing telephone switching centers constructed 20 to 30 years ago were equipped with electro-mechanical switching equipment that was not sensitive to humidity. Today's sophisticated solid-state telecommunications equipment requires specific levels of relative humidity to operate properly. Over the last several years, Einhorn Yaffee Prescott (formerly Rose Beaton + Rose) designed two of the largest ultrasonic humidification systems at telecommunications buildings located in Cheshire, Conn., and White Plains, N.Y. The Cheshire project was a retrofit to the existing system in a 1960smore » building; the White Plains project involved an upgrade to a totally new air handling system, including an ultrasonic humidification component, in a 1950s building.« less

  15. Solar cell power for field instrumentation at White Sands Missile range. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bond, J.W. Jr..; Reckart, D.H. Jr; Milway, W.B.

    1978-01-01

    The initial phase of an Instrumentation Development Project to explore and document what solar power can do for remote field instrumentation systems is described. The work scope consisted of selection, design, construction, test, and delivery of a solar cell power system for White Sands Missile Range. A Drone Formation Control System Interrogator was selected; a power supply was built and installed in the San Andres Mountain Range at WSMR in late August 1977.

  16. Simultaneous dual-band radar development

    NASA Technical Reports Server (NTRS)

    Liskow, C. L.

    1974-01-01

    Efforts to design and construct an airborne imaging radar operating simultaneously at L band and X band with an all-inertial navigation system in order to form a dual-band radar system are described. The areas of development include duplex transmitters, receivers, and recorders, a control module, motion compensation for both bands, and adaptation of a commercial inertial navigation system. Installation of the system in the aircraft and flight tests are described. Circuit diagrams, performance figures, and some radar images are presented.

  17. A common sense approach to sprinklers.

    PubMed

    Passingham, Andy

    2010-03-01

    As debate continues over the importance of incorporating automatic sprinkler systems into healthcare facilities, Andy Passingham, associate director at Arup Fire, considers how Arup, the multi-disciplinary engineers for two high profile new Welsh hospitals under construction in Ebbw Vale and Caerphilly, addressed fire safety on both projects. He highlights how the installation of sprinklers should not only improve fire safety, but has also contributed to a number of wider design elements which should enhance the patient, staff, and visitor experience.

  18. Active and passive multispectral scanner for earth resources applications: An advanced applications flight experiment

    NASA Technical Reports Server (NTRS)

    Hasell, P. G., Jr.; Peterson, L. M.; Thomson, F. J.; Work, E. A.; Kriegler, F. J.

    1977-01-01

    The development of an experimental airborne multispectral scanner to provide both active (laser illuminated) and passive (solar illuminated) data from a commonly registered surface scene is discussed. The system was constructed according to specifications derived in an initial programs design study. The system was installed in an aircraft and test flown to produce illustrative active and passive multi-spectral imagery. However, data was not collected nor analyzed for any specific application.

  19. Cell module and fuel conditioner

    NASA Technical Reports Server (NTRS)

    Hoover, D. Q., Jr.

    1980-01-01

    Measurements of stack height changes with temperature and cell material characteristics were made. Stack 559 was assembled and components were fabricated for 560, 561, and 562. Stack 425 was transferred from the parallel DOE program and installed in the OS/IES simulation loop for mechanical and electrical testing. Construction and preliminary checkout of the 2 kW test facility was completed and design and procurement of the 8 kW test facility was initiated. The fuel conditioning subsystem design continued to evolve and the state points for the current design were calculated at full and part load conditions. Steam reforming catalyst activity tests were essentially completed and aging tests and CO shift converter tests were initiated.

  20. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Colliat, J.L.; Boisard, P.; Andersen, K.

    Shallow caisson foundations are considered as alternative anchors for permanent mooring of a process barge at an oil and gas field developed by ELF Congo in the Gulf of Guinea. The 12 mooring lines are scheduled to be installed on site in July 1995 and the process barge will be connected in 1996 for start of production. With a water depth of about 170m, this field will be the deepest one offshore Western Africa to date. The soils at the site consist of soft normally consolidated clays. The paper presents the results of a comparative study of potential anchor solutionsmore » for this production barge, including high capacity drag anchors, driven piles, and shallow caisson foundations installed by underpressure. This comparative study, including design, construction, and installation of the mooring system, has shown that the caisson foundations represent the best suited solution, technically as well as on an economical point of view, because of the following advantages: (1) vertical load capability, thus allowing to reduce the anchoring pattern, (2) once positioned on the seabed, the location of each anchor is fixed and known with accuracy, and (3) more simple and shorter installation procedure, since caisson anchors, as piles, do not require to be proof-loaded on site.« less

  1. Static design of steel-concrete lining for traffic tunnels

    NASA Astrophysics Data System (ADS)

    Vojtasik, Karel; Mohyla, Marek; Hrubesova, Eva

    2017-09-01

    Article summarizes the results of research focused on the structural design of traffic tunnel linings that have been achieved in the framework of a research project TE01020168 that supports The Technology Agency of Czech Republic. This research aim is to find and develop a process for design structure parameters of tunnel linings. These are now mostly build up by a shotcrete technology. The shotcrete is commonly endorsed either with steel girders or steel fibres. Since the installation a lining structure is loaded while strength and deformational parameters of shotcrete start to rise till the setting time elapses. That’s reason why conventional approaches of reinforced concrete are not suitable. As well as there are other circumstances to step in shown in this article. Problem is solved by 3D analysis using numerical model that takes into account all the significant features of a tunnel lining construction process inclusive the interaction between lining structure with rock massive. Analysis output is a view into development of stress-strain state in respective construction parts of tunnel lining the whole structure around, including impact on stability of rock massive. The proposed method comprises all features involved in tunnel fabrication including geotechnics and construction technologies.

  2. Fast Imaging Solar Spectrograph System in New Solar Telescope

    NASA Astrophysics Data System (ADS)

    Park, Y.-D.; Kim, Y. H.; Chae, J.; Goode, P. R.; Cho, K. S.; Park, H. M.; Nah, J. K.; Jang, B. H.

    2010-12-01

    In 2004, Big Bear Solar Observatory in California, USA launched a project for construction of the world's largest aperture solar telescope (D = 1.6m) called New Solar Telescope(NST). University of Hawaii (UH) and Korea Astronomy and Space Science Institute(KASI) partly collaborate on the project. NST is a designed off-axis parabolic Gregorian reflector with very high spatial resolution(0.07 arcsec at 5000A) and is equipped with several scientific instruments such as Visible Imaging Magnetograph (VIM), InfraRed Imaging Magnetograph IRIM), and so on. Since these scientific instruments are focused on studies of the solar photosphere, we need a post-focus instrument for the NST to study the fine structures and dynamic patterns of the solar chromosphere and low Transition Region (TR) layer, including filaments/prominences, spicules, jets, micro flares, etc. For this reason, we developed and installed a fast imaging solar spectrograph(FISS) system on the NST withadvantages of achieving compact design with high spectral resolution and small aberration as well as recording many solar spectral lines in a single and/or dual band mode. FISS was installed in May, 2010 and now we carry out a test observation. In this talk, we introduce the FISS system and the results of the test observation after FISS installation.

  3. 30 CFR 285.632 - What documents must I submit before I may construct and install facilities under my approved COP?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... construct and install facilities under my approved COP? 285.632 Section 285.632 Mineral Resources MINERALS... FACILITIES ON THE OUTER CONTINENTAL SHELF Plans and Information Requirements Activities Under An Approved Cop... COP? (a) You must submit to MMS the documents listed in the following table: ER29AP09.124 (b) You must...

  4. Eleventh Annual Report of Accomplishments Under the Airport Improvement Program

    DTIC Science & Technology

    1992-01-01

    552,860 INSTALL SECURITY SYSTEM PORTLAND INTERNATIONAL JETPORT (PRIMARY) 25 $255, 195 CONSTRUCT ACCESS ROAD PRESQUE ISLE 09 $988,548 CONSTRUCT AIRCRAFT...TAXIWAYS; INSTALL VISUAL APPROACH AIDS PENNSYLVANIA COMMONWEALTH OF PENNSYLVANIA S7 $89,050 CONDUCT STATE SYSTEM PLAN UPDATE (SYSTEM PLAN) DELAWARE...VALLEY REGION RA $195,030 CONDUCT STATE SYSTEM PLAN UPDATE (SYSTEM PLAN) SOUTHWESTERN PENNSYLVANIA REGION RA $310,950 CONDUCT REGIONAL SYSTEM PLAN

  5. The implementation of the integrated design process in the hole-plan system

    NASA Astrophysics Data System (ADS)

    Ruy, Won-Sun; Ko, Dae-Eun; Yang, Young-Soon

    2012-12-01

    All current shipyards are using the customized CAD/CAM programs in order to improve the design quality and increase the design efficiency. Even though the data structures for ship design and construction are almost completed, the implementation related to the ship design processes are still in progress so that it has been the main causes of the bottleneck and delay during the middle of design process. In this study, we thought that the hole-plan system would be a good example which is remained to be improved. The people of outfitting division who don't have direct authority to edit the structural panels, should request the hull design division to install the holes for the outfitting equipment. For acceptance, they should calculate the hole position, determine the hole type, and find the intersected contour of panel. After consideration of the hull people, the requested holes are manually installed on the hull structure. As the above, many processes are needed such as communication and discussion between the divisions, drawings for hole-plan, and the consideration for the structural or production compatibility. However this iterative process takes a lot of working time and requires mental pressure to the related people and cross-division conflict. This paper will handle the hole-plan system in detail to automate the series of process and minimize the human efforts and time-consumption.

  6. 10 CFR 960.5-2-4 - Offsite installations and operations.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... present projected effects from nearby industrial, transportation, and military installations and..., construction, operation, closure, or decommissioning or can be accommodated by engineering measures and (2...

  7. 10 CFR 960.5-2-4 - Offsite installations and operations.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... present projected effects from nearby industrial, transportation, and military installations and..., construction, operation, closure, or decommissioning or can be accommodated by engineering measures and (2...

  8. 10 CFR 960.5-2-4 - Offsite installations and operations.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... present projected effects from nearby industrial, transportation, and military installations and..., construction, operation, closure, or decommissioning or can be accommodated by engineering measures and (2...

  9. 10 CFR 960.5-2-4 - Offsite installations and operations.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... present projected effects from nearby industrial, transportation, and military installations and..., construction, operation, closure, or decommissioning or can be accommodated by engineering measures and (2...

  10. KSC-2010-4698

    NASA Image and Video Library

    2010-09-20

    CAPE CANAVERAL, Fla. - Workers of Superior Solar LLC in Longwood, Fla., begin to install more than 300 solar panels on the roof of the Propellants North Administrative and Maintenance Facility at NASA's Kennedy Space Center in Florida. Each panel, built in Sharp Corp.'s Memphis, Tenn., plant, will produce 235 watts of clean energy. The green facility in Kennedy's Launch Complex 39 area will have a two-story administrative building to house managers, mechanics and technicians who fuel spacecraft at Kennedy adjacent to a single-story shop to store cryogenic fuel transfer equipment. The facility is striving to qualify for the U.S. Green Building Council’s Leadership in Energy and Environmental Design (LEED) Platinum certification. If successful, it will be the first NASA facility to achieve this highest of LEED ratings after it is completed. The facility was designed for NASA by Jones Edmunds and Associates. H. W. Davis Construction is the construction contractor. Photo credit: NASA/Jim Grossmann

  11. KSC-2010-4700

    NASA Image and Video Library

    2010-09-20

    CAPE CANAVERAL, Fla. - Workers of Superior Solar LLC in Longwood, Fla., begin to install more than 300 solar panels on the roof of the Propellants North Administrative and Maintenance Facility at NASA's Kennedy Space Center in Florida. Each panel, built in Sharp Corp.'s Memphis, Tenn., plant, will produce 235 watts of clean energy. The green facility in Kennedy's Launch Complex 39 area will have a two-story administrative building to house managers, mechanics and technicians who fuel spacecraft at Kennedy adjacent to a single-story shop to store cryogenic fuel transfer equipment. The facility is striving to qualify for the U.S. Green Building Council’s Leadership in Energy and Environmental Design (LEED) Platinum certification. If successful, it will be the first NASA facility to achieve this highest of LEED ratings after it is completed. The facility was designed for NASA by Jones Edmunds and Associates. H. W. Davis Construction is the construction contractor. Photo credit: NASA/Jim Grossmann

  12. KSC-2010-4699

    NASA Image and Video Library

    2010-09-20

    CAPE CANAVERAL, Fla. - Workers of Superior Solar LLC in Longwood, Fla., prepare to install more than 300 solar panels on the roof of the Propellants North Administrative and Maintenance Facility at NASA's Kennedy Space Center in Florida. Each panel, built in Sharp Corp.'s Memphis, Tenn., plant, will produce 235 watts of clean energy. The green facility in Kennedy's Launch Complex 39 area will have a two-story administrative building to house managers, mechanics and technicians who fuel spacecraft at Kennedy adjacent to a single-story shop to store cryogenic fuel transfer equipment. The facility is striving to qualify for the U.S. Green Building Council’s Leadership in Energy and Environmental Design (LEED) Platinum certification. If successful, it will be the first NASA facility to achieve this highest of LEED ratings after it is completed. The facility was designed for NASA by Jones Edmunds and Associates. H. W. Davis Construction is the construction contractor. Photo credit: NASA/Jim Grossmann

  13. KSC-2010-4697

    NASA Image and Video Library

    2010-09-20

    CAPE CANAVERAL, Fla. - Workers of Superior Solar LLC in Longwood, Fla., begin to install more than 300 solar panels on the roof of the Propellants North Administrative and Maintenance Facility at NASA's Kennedy Space Center in Florida. Each panel, built in Sharp Corp.'s Memphis, Tenn., plant, will produce 235 watts of clean energy. The green facility in Kennedy's Launch Complex 39 area will have a two-story administrative building to house managers, mechanics and technicians who fuel spacecraft at Kennedy adjacent to a single-story shop to store cryogenic fuel transfer equipment. The facility is striving to qualify for the U.S. Green Building Council’s Leadership in Energy and Environmental Design (LEED) Platinum certification. If successful, it will be the first NASA facility to achieve this highest of LEED ratings after it is completed. The facility was designed for NASA by Jones Edmunds and Associates. H. W. Davis Construction is the construction contractor. Photo credit: NASA/Jim Grossmann

  14. Design and performance of an X-ray scanning microscope at the Hard X-ray Nanoprobe beamline of NSLS-II

    DOE PAGES

    Nazaretski, E.; Yan, H.; Lauer, K.; ...

    2017-10-05

    A hard X-ray scanning microscope installed at the Hard X-ray Nanoprobe beamline of the National Synchrotron Light Source II has been designed, constructed and commissioned. The microscope relies on a compact, high stiffness, low heat dissipation approach and utilizes two types of nanofocusing optics. It is capable of imaging with ~15 nm × 15 nm spatial resolution using multilayer Laue lenses and 25 nm × 26 nm resolution using zone plates. Fluorescence, diffraction, absorption, differential phase contrast, ptychography and tomography are available as experimental techniques. The microscope is also equipped with a temperature regulation system which allows the temperature ofmore » a sample to be varied in the range between 90 K and 1000 K. The constructed instrument is open for general users and offers its capabilities to the material science, battery research and bioscience communities.« less

  15. New high-precision drift-tube detectors for the ATLAS muon spectrometer

    NASA Astrophysics Data System (ADS)

    Kroha, H.; Fakhrutdinov, R.; Kozhin, A.

    2017-06-01

    Small-diameter muon drift tube (sMDT) detectors have been developed for upgrades of the ATLAS muon spectrometer. With a tube diameter of 15 mm, they provide an about an order of magnitude higher rate capability than the present ATLAS muon tracking detectors, the MDT chambers with 30 mm tube diameter. The drift-tube design and the construction methods have been optimised for mass production and allow for complex shapes required for maximising the acceptance. A record sense wire positioning accuracy of 5 μm has been achieved with the new design. In the serial production, the wire positioning accuracy is routinely better than 10 μm. 14 new sMDT chambers are already operational in ATLAS, further 16 are under construction for installation in the 2019-2020 LHC shutdown. For the upgrade of the barrel muon spectrometer for High-Luminosity LHC, 96 sMDT chambers will be contructed between 2020 and 2024.

  16. Design and performance of an X-ray scanning microscope at the Hard X-ray Nanoprobe beamline of NSLS-II

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Nazaretski, E.; Yan, H.; Lauer, K.

    A hard X-ray scanning microscope installed at the Hard X-ray Nanoprobe beamline of the National Synchrotron Light Source II has been designed, constructed and commissioned. The microscope relies on a compact, high stiffness, low heat dissipation approach and utilizes two types of nanofocusing optics. It is capable of imaging with ~15 nm × 15 nm spatial resolution using multilayer Laue lenses and 25 nm × 26 nm resolution using zone plates. Fluorescence, diffraction, absorption, differential phase contrast, ptychography and tomography are available as experimental techniques. The microscope is also equipped with a temperature regulation system which allows the temperature ofmore » a sample to be varied in the range between 90 K and 1000 K. The constructed instrument is open for general users and offers its capabilities to the material science, battery research and bioscience communities.« less

  17. Status and Plans for the FLARE (Facility for Laboratory Reconnection Experiments) Project

    NASA Astrophysics Data System (ADS)

    Ji, H.; Bhattacharjee, A.; Prager, S.; Daughton, W.; Bale, S.; Carter, T.; Crocker, N.; Drake, J.; Egedal, J.; Sarff, J.; Wallace, J.; Chen, Y.; Cutler, R.; Fox, W.; Heitzenroeder, P.; Kalish, M.; Jara-Almonte, J.; Myers, C.; Ren, Y.; Yamada, M.; Yoo, J.

    2015-11-01

    The FLARE device (flare.pppl.gov) is a new intermediate-scale plasma experiment under construction at Princeton to study magnetic reconnection in regimes directly relevant to space, solar, astrophysical, and fusion plasmas. The existing small-scale experiments have been focusing on the single X-line reconnection process either with small effective sizes or at low Lundquist numbers, but both of which are typically very large in natural and fusion plasmas. The design of the FLARE device is motivated to provide experimental access to the new regimes involving multiple X-lines, as guided by a reconnection ``phase diagram'' [Ji & Daughton, PoP (2011)]. Most of major components of the FLARE device have been designed and are under construction. The device will be assembled and installed in 2016, followed by commissioning and operation in 2017. The planned research on FLARE as a user facility will be discussed. Supported by NSF.

  18. Establishing a design for passive vertical flow constructed wetlands treating small sewage discharges to meet British Standard EN 12566.

    PubMed

    Weedon, Christopher Michael; Murphy, Clodagh; Sweaney, Geoff

    2017-01-01

    Owing to legislation change (which made General Binding Rules effective from 1 January 2015) unless discharge is to specified environmentally sensitive sites, small sewage discharges (SSDs) in England - that is, <2 m 3  d -1 to ground; <5 m 3  d -1 to surface waters - no longer require an Environmental Permit (EP) and need not be registered for exemption, provided discharge to surface waters is preceded by treatment using equipment complying with BS EN 12566. This effectively excludes the use of treatment wetlands, unless covered by an EP, because the cost of certification to EN 12566 for bespoke designs is prohibitive. EPs take up to four months to obtain. Therefore, the new legislation has created a commercial disadvantage for constructed wetlands treating SSDs, compared with mass-produced sewage treatment plants. However, the UK statutory pollution regulators have maintained a dialogue with the Constructed Wetland Association (CWA), with a view to assessing whether treatment of SSD using constructed wetlands might be allowable, without requiring EPs. This paper presents treatment performance data obtained over 15 years, from a variety of full-scale operational treatment wetlands, as supporting evidence for design guidelines, proposed by the CWA to the UK regulators, for the implementation of constructed wetlands continuously passively treating SSD to 20:30:20 mg l -1 BOD/SS/NH4-N under a wide range of loading rates. Relevant experience of UK designers, installers and operators since the early 1990s is included, resulting in recommended physical design criteria and loading rates for compact vertical flow reed beds, presented here as key elements of the draft guidelines.

  19. SU-E-T-243: Design of a Novel Testing Port for Radiation Protection and Shielding Measurements

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Tanny, S; Parsai, E; Harrell, D

    2015-06-15

    Purpose: The majority of radiation shielding research utilizes Monte Carlo simulation because of the difficulty in eliminating secondary radiations from measurements. We have designed a test port into a primary barrier of our newest vault to allow for shielding measurements while ensuring adequate protection to the public and staff during normal machine operation. This port allows for measurement of attenuation values of shielding materials, differential dose albedos, and radiation scatter fractions. Methods: The vault design utilized the maze as part of a compound primary barrier. The test port is contained within the maze and is centered along isocenter. The innermore » 30 cm has a 20×20 cm{sup 2} opening, while the remaining length has a 30×30 cm{sup 2} opening. The block that contains the port has a density of 200 pcf to minimize internal scatter. The 30×30 cm{sup 2} opening is occupied by removable 215 pcf concrete blocks. The innermost and outermost blocks activate an interlock wired into the beam-enable loop. This disallows beam-on in treatment mode if the interlock isn’t closed. The interlock can be overridden in service mode, or by-passed via an override switch in case of circuit failure. Results: The test port was installed in August. The beam is disabled when the interlock is tripped. Measurements taken when the primary beam is not incident on the port are indistinguishable from background. Ambient dose levels surrounding the vault with the designed shielding blocks in place are all within allowable limits for occupational workers. Conclusions: We have designed and installed a unique testing port for radiation protection and shielding measurements. This port is appropriately interlocked and designed to mitigate any risks of incidental exposure to staff or members of the public. The test port design allows measurements with “good geometry” and efficient removal of contaminating sources of radiation present in many shielding measurements. Daniel Harrell and Jim Noller are employees of Shielding Construction Solutions, Inc, the shielding construction company that built the vault discussed in this abstract. Manjit Chopra is an employee of Universal Minerals International, Inc, the company that provided the aggregates for the high density concretes used in the vault construction.« less

  20. Effects of Jefferson Road stormwater-detention basin on loads and concentrations of selected chemical constituents in East Branch of Allen Creek at Pittsford, Monroe County, New York

    USGS Publications Warehouse

    Sherwood, Donald A.

    2004-01-01

    Discharge and water-quality data collection at East Branch Allen Creek from 1990 through 2000 provide a basis for estimating the effect of the Jefferson Road detention basin on loads and concentrations of chemical constituents downstream from the basin. Mean monthly flow for the 5 years prior to construction of the detention basin (8.71 ft3/s) was slightly lower than after (9.08 ft3/s). The slightly higher mean monthly flow after basin construction may have been influenced by the peak flow for the period of record that occurred in July 1998 or variations in flow diverted from the canal. No statistically significant difference in average monthly mean flow before and after basin installation was indicated.Total phosphorus was the only constituent to show no months with significant differences in load after basin construction. Several constituents showed months with significantly smaller loads after basin construction than before, whereas some constituents showed certain months with smaller and some months with greater loads, after basin construction. Statistical analysis of the "mean monthly load" for all months before and all months after construction of the detention basin showed only one constituent (ammonia + organic nitrogen) with a significantly lower load after construction and none with higher loads.Median concentrations of ammonia + organic nitrogen showed a statistically significant decrease (from 0.78 mg/L to 0.60 mg/L) after basin installation, as did nitrite + nitrate (from 1.50 mg/L to 0.96 mg/L); in contrast, the median concentration of dissolved chloride increased from 95.5 mg/L before basin installation to 109 mg/L thereafter. A trend analysis of constituent concentrations before and after installation of the detention basin showed that total phosphorus had a downward trend after installation.Analysis of the data collected at East Branch Allen Creek indicates that the Jefferson Road detention basin, in some cases, provides an improvement (reduction) in loads of some constituents. These results are uncertain, however, because hydrologic conditions before basin installation differed from those in the 5 years that followed, and because inflow from the Erie-Barge canal may alter the water quality in the 1-mi reach between the basin outflow and the gaging station.

  1. Dendrometer bands made easy: Using modified cable ties to measure incremental growth of trees1

    PubMed Central

    Anemaet, Evelyn R.; Middleton, Beth A.

    2013-01-01

    • Premise of the study: Dendrometer bands are a useful way to make sequential repeated measurements of tree growth, but traditional dendrometer bands can be expensive, time consuming, and difficult to construct in the field. An alternative to the traditional method of band construction is to adapt commercially available materials. This paper describes how to construct and install dendrometer bands using smooth-edged, stainless steel, cable tie banding and attachable rollerball heads. • Methods and Results: As a performance comparison, both traditional and cable tie dendrometer bands were installed on baldcypress trees at the National Wetlands Research Center in Lafayette, Louisiana, by both an experienced and a novice worker. Band installation times were recorded, and growth of the trees as estimated by the two band types was measured after approximately one year, demonstrating equivalence of the two methods. • Conclusions: This efficient approach to dendrometer band construction can help advance the knowledge of long-term tree growth in ecological studies. PMID:25202589

  2. A scintillator purification plant and fluid handling system for SNO+

    NASA Astrophysics Data System (ADS)

    Ford, Richard J.

    2015-08-01

    A large capacity purification plant and fluid handling system has been constructed for the SNO+ neutrino and double-beta decay experiment, located 6800 feet underground at SNOLAB, Canada. SNO+ is a refurbishment of the SNO detector to fill the acrylic vessel with liquid scintillator based on Linear Alkylbenzene (LAB) and 2 g/L PPO, and also has a phase to load natural tellurium into the scintillator for a double-beta decay experiment with 130Te. The plant includes processes multi-stage dual-stream distillation, column water extraction, steam stripping, and functionalized silica gel adsorption columns. The plant also includes systems for preparing the scintillator with PPO and metal-loading the scintillator for double-beta decay exposure. We review the basis of design, the purification principles, specifications for the plant, and the construction and installations. The construction and commissioning status is updated.

  3. Final Assembly and Factory Testing of the Jefferson Lab SHMS Spectrometer Quadrupole and Dipole Superconducting Magnets

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Brindza, Paul; Lassiter, Steven; Sun, Eric

    Jefferson Lab is constructing an 11 Gev/c electron spectrometer called the Super High Momentum Spectrometer (SHMS) as part of the 12 GeV JLAB upgrade for experimental Hall C. Three of the five superconducting(SC) SHMS magnets are under construction at SigmaPhi in Vannes France as a result of an international competition for design and fabrication. The three magnets Q2 and Q3 60 cm bore quadrupoles and the 60 cm warm bore dipole are complete or near complete and have many design features in common. All three magnets share a common superconductor, collaring system, cryostat design, cold to warm support, cryogenic interface,more » burnout resistant current leads, DC power supply, quench protection, instrumentation and controls. The three magnets are collared, installed in cryostats and welded up and in various stages of final testing. The Q2 quadrupole is due to ship from France to America in August arriving during this ASC conference and has passed all final hipot, leak and pressure tests. The dipole is in leak and pressure testing as of July 2016 while the Q3 quadrupole requires some outer vacuum vessel assembly. Delivery of the Q3 and Dipole magnets will follow the Q2 at about 1 month intervals. Lastly, factory testing have included hipot and electrical tests, magnetic tests at low field, mechanical alignments to center the coils, leak tests and ASME Code required pressure tests. Upon installation in Hall C at JLAB cold testing will commence.« less

  4. Final Assembly and Factory Testing of the Jefferson Lab SHMS Spectrometer Quadrupole and Dipole Superconducting Magnets

    DOE PAGES

    Brindza, Paul; Lassiter, Steven; Sun, Eric; ...

    2017-06-01

    Jefferson Lab is constructing an 11 Gev/c electron spectrometer called the Super High Momentum Spectrometer (SHMS) as part of the 12 GeV JLAB upgrade for experimental Hall C. Three of the five superconducting(SC) SHMS magnets are under construction at SigmaPhi in Vannes France as a result of an international competition for design and fabrication. The three magnets Q2 and Q3 60 cm bore quadrupoles and the 60 cm warm bore dipole are complete or near complete and have many design features in common. All three magnets share a common superconductor, collaring system, cryostat design, cold to warm support, cryogenic interface,more » burnout resistant current leads, DC power supply, quench protection, instrumentation and controls. The three magnets are collared, installed in cryostats and welded up and in various stages of final testing. The Q2 quadrupole is due to ship from France to America in August arriving during this ASC conference and has passed all final hipot, leak and pressure tests. The dipole is in leak and pressure testing as of July 2016 while the Q3 quadrupole requires some outer vacuum vessel assembly. Delivery of the Q3 and Dipole magnets will follow the Q2 at about 1 month intervals. Lastly, factory testing have included hipot and electrical tests, magnetic tests at low field, mechanical alignments to center the coils, leak tests and ASME Code required pressure tests. Upon installation in Hall C at JLAB cold testing will commence.« less

  5. Energy accounting of River Severn tidal power schemes

    NASA Astrophysics Data System (ADS)

    Roberts, F.

    1982-07-01

    Energy accounting comparisons are constructed in order to make an economic analysis of three different tidal generating schemes for the Severn River in Britain. The plans included ebb generation, flood generation, and turbine-sluice configurations, and the analysis comprised totaling the energy needed to complete the construction in relation to the projected output. Necessary construction components numbered caissons, shipping locks, embankments, transmission facilities, and turbines, with inputs limited to 1.75%/yr once the installations are completed. The total outputs for the installations were modeled as 12, 18, and 18 TWh/yr, respectively, with a projected lifetime of 120 yr. The least output/input ratio was found to be 10:1, with a highest possible value of 16:1. The energy return is highest with the smallest installation, a factor which is offset by the increased return with larger capacity.

  6. 14 CFR 171.323 - Fabrication and installation requirements.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... must be located, constructed, and installed in accordance with best commercial engineering practices... software and/or hardware in space provided in the original equipment. (d) The mean corrective maintenance...

  7. 14 CFR 171.323 - Fabrication and installation requirements.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... must be located, constructed, and installed in accordance with best commercial engineering practices... software and/or hardware in space provided in the original equipment. (d) The mean corrective maintenance...

  8. 14 CFR 171.323 - Fabrication and installation requirements.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... must be located, constructed, and installed in accordance with best commercial engineering practices... software and/or hardware in space provided in the original equipment. (d) The mean corrective maintenance...

  9. 14 CFR 171.323 - Fabrication and installation requirements.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... must be located, constructed, and installed in accordance with best commercial engineering practices... software and/or hardware in space provided in the original equipment. (d) The mean corrective maintenance...

  10. Advanced evaporator technology progress report FY 1992

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Chamberlain, D.; Hutter, J.C.; Leonard, R.A.

    1995-01-01

    This report summarizes the work that was completed in FY 1992 on the program {open_quotes}Technology Development for Concentrating Process Streams.{close_quotes} The purpose of this program is to evaluate and develop evaporator technology for concentrating radioactive waste and product streams such as those generated by the TRUEX process. Concentrating these streams and minimizing the volume of waste generated can significantly reduce disposal costs; however, equipment to concentrate the streams and recycle the decontaminated condensates must be installed. LICON, Inc., is developing an evaporator that shows a great deal of potential for this application. In this report, concepts that need to bemore » incorporated into the design of an evaporator operated in a radioactive environment are discussed. These concepts include criticality safety, remote operation and maintenance, and materials of construction. Both solubility and vapor-liquid equilibrium data are needed to design an effective process for concentrating process streams. Therefore, literature surveys were completed and are summarized in this report. A model that is being developed to predict vapor phase compositions is described. A laboratory-scale evaporator was purchased and installed to study the evaporation process and to collect additional data. This unit is described in detail. Two new LICON evaporators are being designed for installation at Argonne-East in FY 1993 to process low-level radioactive waste generated throughout the laboratory. They will also provide operating data from a full-sized evaporator processing radioactive solutions. Details on these evaporators are included in this report.« less

  11. Algorithm of composing the schedule of construction and installation works

    NASA Astrophysics Data System (ADS)

    Nehaj, Rustam; Molotkov, Georgij; Rudchenko, Ivan; Grinev, Anatolij; Sekisov, Aleksandr

    2017-10-01

    An algorithm for scheduling works is developed, in which the priority of the work corresponds to the total weight of the subordinate works, the vertices of the graph, and it is proved that for graphs of the tree type the algorithm is optimal. An algorithm is synthesized to reduce the search for solutions when drawing up schedules of construction and installation works, allocating a subset with the optimal solution of the problem of the minimum power, which is determined by the structure of its initial data and numerical values. An algorithm for scheduling construction and installation work is developed, taking into account the schedule for the movement of brigades, which is characterized by the possibility to efficiently calculate the values of minimizing the time of work performance by the parameters of organizational and technological reliability through the use of the branch and boundary method. The program of the computational algorithm was compiled in the MatLAB-2008 program. For the initial data of the matrix, random numbers were taken, uniformly distributed in the range from 1 to 100. It takes 0.5; 2.5; 7.5; 27 minutes to solve the problem. Thus, the proposed method for estimating the lower boundary of the solution is sufficiently accurate and allows efficient solution of the minimax task of scheduling construction and installation works.

  12. Offshore wind development research (technical brief).

    DOT National Transportation Integrated Search

    2014-04-01

    The study addresses all aspects of Offshore Wind (OSW) development. This includes identifying : vessel types, vessel installation methods, needs and operating characteristics through all phases : of OSW installation, construction, operations and main...

  13. Detecting Defects Within Soil-Bentonite Slurry Cutoff Walls Using Electrical Resistivity Methods

    NASA Astrophysics Data System (ADS)

    Aborn, L.; Jacob, R. W.; Mucelli, A.

    2016-12-01

    Installed in the subsurface, vertical cutoff walls may limit groundwater movement. The effectiveness of these walls can be undermined by defects, for example high permeability material, within the wall. An efficient way of detecting these defects in a soil-bentonite slurry cutoff wall has yet to be established. We installed an approximately 200-meter long and 7-meter deep soil-bentonite slurry cutoff wall for the purposes of research. The wall was constructed adjacent to a natural wetland, the Montandon Marsh near Lewisburg, PA. The wall is composed of soil-bentonite backfill and was designed to be a typical low permeability material. We evaluate the capability of non-invasive geophysical techniques, specifically electrical resistivity, to detect high permeability defects that are expected to have higher electrical resistivity values than the backfill material. The laboratory measured electrical resistivity of the backfill used for construction was 12.27-ohm meters. During construction, designed defects of saturated fine-grained sand bags were deployed at different positions and depths within the wall. To create larger defects multiple bags were tied together. Laboratory resistivity testing of the sand and the filled sand bags indicates values between 125-ohm meters at full saturation and 285-ohm meters at partial saturation. Post construction, we collected electrical resistivity data using a 28-channel system along the centerline of the cutoff wall, which indicated the backfill material to have a resistivity value of 15-ohm meters. The electrical resistivity profile was affected by the sidewalls of the trench, as expected, which may explain the difference between laboratory results and field measurements. To minimize the sidewalls obscuring the defects, we developed electrodes that are pushed into the backfill at different depths to collect subsurface resistivity. Different arrays and electrode spacings are being tested. Our presentation will report the most effective method for detecting defects within a soil-bentonite cutoff wall.

  14. Phase Change Material Heat Sink for an ISS Flight Experiment

    NASA Technical Reports Server (NTRS)

    Quinn, Gregory; Stieber, Jesse; Sheth, Rubik; Ahlstrom, Thomas

    2015-01-01

    A flight experiment is being constructed to utilize the persistent microgravity environment of the International Space Station (ISS) to prove out operation of a microgravity compatible phase change material (PCM) heat sink. A PCM heat sink can help to reduce the overall mass and volume of future exploration spacecraft thermal control systems (TCS). The program is characterizing a new PCM heat sink that incorporates a novel phase management approach to prevent high pressures and structural deformation that often occur with PCM heat sinks undergoing cyclic operation in microgravity. The PCM unit was made using brazed aluminum construction with paraffin wax as the fusible material. It is designed to be installed into a propylene glycol and water cooling loop, with scaling consistent with the conceptual designs for the Orion Multipurpose Crew Vehicle. This paper reports on the construction of the PCM heat sink and on initial ground test results conducted at UTC Aerospace Systems prior to delivery to NASA. The prototype will be tested later on the ground and in orbit via a self-contained experiment package developed by NASA Johnson Space Center to operate in an ISS EXPRESS rack.

  15. 46 CFR 183.200 - General design, installation, and maintenance requirements.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 7 2012-10-01 2012-10-01 false General design, installation, and maintenance requirements. 183.200 Section 183.200 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) SMALL PASSENGER VESSELS (UNDER 100 GROSS TONS) ELECTRICAL INSTALLATION General Requirements § 183.200 General design, installation, and maintenance...

  16. 46 CFR 183.200 - General design, installation, and maintenance requirements.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 7 2010-10-01 2010-10-01 false General design, installation, and maintenance requirements. 183.200 Section 183.200 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) SMALL PASSENGER VESSELS (UNDER 100 GROSS TONS) ELECTRICAL INSTALLATION General Requirements § 183.200 General design, installation, and maintenance...

  17. 46 CFR 183.200 - General design, installation, and maintenance requirements.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 7 2013-10-01 2013-10-01 false General design, installation, and maintenance requirements. 183.200 Section 183.200 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) SMALL PASSENGER VESSELS (UNDER 100 GROSS TONS) ELECTRICAL INSTALLATION General Requirements § 183.200 General design, installation, and maintenance...

  18. 46 CFR 183.200 - General design, installation, and maintenance requirements.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 7 2014-10-01 2014-10-01 false General design, installation, and maintenance requirements. 183.200 Section 183.200 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) SMALL PASSENGER VESSELS (UNDER 100 GROSS TONS) ELECTRICAL INSTALLATION General Requirements § 183.200 General design, installation, and maintenance...

  19. Evaluation of Soil Loss and Erosion Control Measures on Ranges and Range Structures at Installations in Temperate Climates

    DTIC Science & Technology

    2006-06-01

    Soil Loss Equation ( USLE ) and the Revised Universal Soil Loss Equation (RUSLE) continue to be widely accepted methods for estimating sediment loss...range areas. Therefore, a generalized design methodology using the Universal Soil Loss Equation ( USLE ) is presented to accommodate the variations...constructed use the slope most suitable to the area topography (3:1 or 4:1). Step 4: Using the Universal Soil Loss equation, USLE , find the values of A

  20. Analysis of the Radio-Ecological State of Units and Installations Involved in Nuclear Submarine Decommissioning in the Northwest Region of Russia

    DTIC Science & Technology

    2003-01-31

    mechanisms. 109 The main sources of atmospheric pollution are gas cutting and air-arc shaving, used to clean the cutting line from paint and varnish ...and varnish covering and from the metal of the dismantled construction. The dust content is determined by the type of the paint- varnish covering and...Submarines Solid aerosol component, kg Gas aerosol component, kg Design Total amount Including Carbon oxide Nitrogen dioxide Fluorine Manganese

  1. Environmental Assessment. Construction and Maintenance of Wastewater Pipelines and Lift Stations and Installation of Fiber Optic Conduit at Eglin Air Force Base, Florida

    DTIC Science & Technology

    2012-06-01

    habitats . However, on completion of the project, animals would likely return to the project site. There are known rare/protected species as well as...designated critical habitat occurring within the proposed project area. The threatened and endangered species field survey conducted on October 12- 13...critical habitat of the RCW. Numerous cavity trees used by the birds during breeding season were encounters along the Camp Rudder line route. Known as RCW

  2. Handbook of corrosion resistant piping

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Schweitzer, P.A.

    1985-01-01

    The book deals with pertinent design, installation, corrosion resistance, and economic factors necessary to determine the optimum system to handle specific corrodents. Each of the materials, both metallic and nonmetallic, is discussed individually. Suitable construction materials are indicated for over 500 corrodents. Available sizes, weights, and types of fittings are given for each material. Tables of permissible working pressures based on the Petroleum Refinery Piping Code, USAS B31.3, have been calculated for each alloy. Service ratings are included for everything discussed.

  3. Airborne oceanographic lidar system

    NASA Technical Reports Server (NTRS)

    1975-01-01

    Specifications and preliminary design of an Airborne Oceanographic Lidar (AOL) system, which is to be constructed for installation and used on a NASA Wallops Flight Center (WFC) C-54 research aircraft, are reported. The AOL system is to provide an airborne facility for use by various government agencies to demonstrate the utility and practicality of hardware of this type in the wide area collection of oceanographic data on an operational basis. System measurement and performance requirements are presented, followed by a description of the conceptual system approach and the considerations attendant to its development. System performance calculations are addressed, and the system specifications and preliminary design are presented and discussed.

  4. SU-E-T-267: Construction and Evaluation of a Neutron Wall to Shield a 15 MV Linac in a Low-Energy Vault.

    PubMed

    Speiser, M; Hager, F; Foster, R; Solberg, T

    2012-06-01

    To design and quantify the shielding efficacy of an inner Borated Polyethylene (BPE)wall for a 15 MV linac in a low energy vault. A Varian TrueBeam linac with a maximum photon energy of 15 MV was installed in asmaller, preexisting vault. This vault originally housed a low-energy machine and did not havesufficient maze length recommended for neutron attenuation. Effective dose rate calculationswere performed using the Modified Kersey's Method as detailed in NCRP Report No. 151 andfound to be unacceptably high. An initial survey following the machine installation confirmedthese calculations. Rather than restrict the linac beam energy to 10 MV, BPE was investigatedas a neutron moderating addition. An inner wall and door were planned and constructed using4'×8'×1″ thick 5% BPE sheets. The resulting door and wall had 2″ of BPE; conduits and ductwork were also redesigned and shielded. A survey was conducted following construction of thewall. The vault modification reduced the expected effective dose at the vault door from 36.23to 0.010 mSv/week. As specific guidelines for vault modification are lacking, this project quantitativelydemonstrates the potential use of BPE for vault modification. Such modifications may provide alow-cost shielding solution to allow for the use of high energy modes in smaller treatment vaults. © 2012 American Association of Physicists in Medicine.

  5. Pipeline corridors through wetlands -- Impacts on plant communities: Little Timber Creek Crossing, Gloucester County, New Jersey. Topical report, August 1991--January 1993

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Shem, L.M.; Zimmerman, R.E.; Alsum, S.K.

    1994-12-01

    The goal of the Gas Research Institute Wetland Corridors Program is to document impacts of existing pipelines on the wetlands they traverse. To accomplish this goal, 12 existing wetland crossings were surveyed. These sites varied in elapsed time since pipeline construction, wetland type, pipeline installation techniques, and right-of-way (ROW) management practices. This report presents results of a survey conducted over the period of August 5--7, 1991, at the Little Timber Creek crossing in Gloucester County, New Jersey, where three pipelines, constructed in 1950, 1960, and 1990, cross the creek and associated wetlands. The old side of the ROW, created bymore » the installation of the 1960 pipeline, was designed to contain a raised peat bed over the 1950 pipeline and an open-water ditch over the 1960 pipeline. The new portion of the ROW, created by installation of the 1990 pipeline, has an open-water ditch over the pipeline (resulting from settling of the backfill) and a raised peat bed (resulting from rebound of compacted peat). Both the old and new ROWs contain dense stands of herbs; the vegetation on the old ROW was more similar to that in the adjacent natural area than was vegetation in the new ROW. The ROW increased species and habitat diversity in the wetlands. It may contribute to the spread of purple loosestrife and affect species sensitive to habitat fragmentation.« less

  6. Construction quality assurance report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Roscha, V.

    1994-09-08

    This report provides a summary of the construction quality assurance (CQA) observation and test results, including: The results of the geosynthetic and soil materials conformance testing. The observation and testing results associates with the installation of the soil liners. The observation and testing results associated with the installation of the HDPE geomembrane liner systems. The observation and testing results associated with the installation of the leachate collection and removal systems. The observation and testing results associated with the installation of the working surfaces. The observation and testing results associated with in-plant manufacturing process. Summary of submittal reviews by Golder Constructionmore » Services, Inc. The submittal and certification of the piping material specifications. The observation and verification associated of the Acceptance Test Procedure results of the operational equipment functions. Summary of the ECNs which are incorporated into the project.« less

  7. Design Optimization of a Centrifugal Fan with Splitter Blades

    NASA Astrophysics Data System (ADS)

    Heo, Man-Woong; Kim, Jin-Hyuk; Kim, Kwang-Yong

    2015-05-01

    Multi-objective optimization of a centrifugal fan with additionally installed splitter blades was performed to simultaneously maximize the efficiency and pressure rise using three-dimensional Reynolds-averaged Navier-Stokes equations and hybrid multi-objective evolutionary algorithm. Two design variables defining the location of splitter, and the height ratio between inlet and outlet of impeller were selected for the optimization. In addition, the aerodynamic characteristics of the centrifugal fan were investigated with the variation of design variables in the design space. Latin hypercube sampling was used to select the training points, and response surface approximation models were constructed as surrogate models of the objective functions. With the optimization, both the efficiency and pressure rise of the centrifugal fan with splitter blades were improved considerably compared to the reference model.

  8. Designing and Testing of Self-Cleaning Recirculating Zebrafish Tanks.

    PubMed

    Nema, Shubham; Bhargava, Yogesh

    2016-08-01

    Maintenance of large number of zebrafish in captive conditions is a daunting task. This can be eased by the use of recirculating racks with self-cleaning zebrafish tanks. Commercially available systems are costly, and compatibility of intercompany products has never been investigated. Although various cost-effective designs and methods of construction of custom-made recirculating zebrafish racks are available in literature, the design of self-cleaning zebrafish tanks is still not available. In this study, we report the design and method of construction of the self-cleaning unit, which can be fitted in any zebrafish tank. We validated the design by investigating sediment cleaning process in rectangular and cylindrical tank geometries using time lapse imaging. Our results suggest that for both tank geometries, the tanks fitted with self-cleaning unit provided superior sediment cleaning than the tanks fitted with overflow-drain unit. Although the self-cleaning unit could clean the sediment completely from both geometries over prolonged period, the cleaning of sediments was faster in the cylindrical tank than the rectangular tank. In conclusion, cost and efforts of zebrafish maintenance could be significantly reduced through the installation of our self-cleaning unit in any custom-made zebrafish tank.

  9. A next generation, pilot-scale continuous sterilization system for fermentation media

    PubMed Central

    Lester, M.; Brix, T.; Wong, D.; Nuechterlein, J.

    2006-01-01

    A new continuous sterilization system was designed, constructed, started up, and qualified for media sterilization for secondary metabolite cultivations, bioconversions, and enzyme production. An existing Honeywell Total Distributed Control 3000-based control system was extended using redundant High performance Process Manager controllers for 98 I/O (input/output) points. This new equipment was retrofitted into an industrial research fermentation pilot plant, designed and constructed in the early 1980s. Design strategies of this new continuous sterilizer system and the expanded control system are described and compared with the literature (including dairy and bio-waste inactivation applications) and the weaknesses of the prior installation for expected effectiveness. In addition, the reasoning behind selection of some of these improved features has been incorporated. Examples of enhancements adopted include sanitary heat exchanger (HEX) design, incorporation of a “flash” cooling HEX, on-line calculation of Fo and Ro, and use of field I/O modules located near the vessel to permit low-cost addition of new instrumentation. Sterilizer performance also was characterized over the expected range of operating conditions. Differences between design and observed temperature, pressure, and other profiles were quantified and investigated. PMID:16496186

  10. Solar space heating installed at Kansas City, Kansas

    NASA Technical Reports Server (NTRS)

    1981-01-01

    The solar energy system was constructed with the 48,800 square feet warehouse to heat the warehouse area of about 39,000 square feet while an auxiliary energy system heats the office area of about 9,800 square feet. The building is divided into 20 equal units, and each has its own solar system. The modular design permits the flexibility of combining multiple units to form offices or warehouses of various size floor areas as required by a tenant. Each unit has 20 collectors which are mounted in a single row. The collectors are double glazed flat plate collectors with a gross area of 7,800 sq ft. Air is heated either through the collectors or by the electric resistance duct coils. Extracts from the site files, specifications, drawings, installation, operation and maintenance instructions are presented.

  11. Arch-bridge Lift Process Monitoring by Using Packaged Optical Fibre Strain Sensors with Temperature Compensation

    NASA Astrophysics Data System (ADS)

    Mokhtar, M. R.; Sun, T.; Grattan, K. T. V.; Owens, K.; Kwasny, J.; Taylor, S. E.; Basheer, P. A. M.; Cleland, D.; Bai, Y.; Sonebi, M.; Davis, G.; Gupta, A.; Hogg, I.; Bell, B.; Doherty, W.; McKeague, S.; Moore, D.; Greeves, K.

    2011-08-01

    This paper presents a novel sensor design and packaging, specifically developed to allow fibre grating-based sensors to be used in harsh, in-the-field measurement conditions for accurate strain measurement, with full temperature compensation. After these sensors are carefully packaged and calibrated in the laboratory, they are installed onto the paragrid of a set of flat-packed concrete units, created specifically for forming a small-scale, lightweight and inexpensive flexi-arch bridge. During the arch-bridge lifting process, the sensors are used for real-time strain measurements to ensure the quality of the construction. During the work done, the sensors have demonstrated enhanced resilience when embedded in concrete structures, providing accurate and consistent strain measurements during the whole installation process and beyond into monitoring the integrity and use of the structure.

  12. Housing Interventions and Control of Injury-Related Structural Deficiencies: A Review of the Evidence

    PubMed Central

    DiGuiseppi, Carolyn; Jacobs, David E.; Phelan, Kieran J.; Mickalide, Angela; Ormandy, David

    2010-01-01

    Subject matter experts systematically reviewed evidence on the effectiveness of housing interventions that affect safety and injury outcomes, such as falls, fire-related injuries, burns and drowning, carbon monoxide poisoning, heat-related deaths, and noise-related harm, associated with structural housing deficiencies. Structural deficiencies were defined as those deficiencies for which a builder, landlord, or homeowner would take responsibility (ie, design, construction, installation, repair, monitoring). Three of the 17 interventions reviewed had sufficient evidence for implementation: installed, working smoke alarms; 4-sided isolation pool fencing; and preset safe hot water temperature. Five interventions needed more field evaluation, 8 needed formative research, and 1 was found to be ineffective. This evidence review shows that housing improvements are likely to help reduce burns and scalds, drowning in pools, and fire-related deaths and injuries. PMID:20689373

  13. BEAM EXTRACTION FROM THE RECYCLER RING TO P1 LINE AT FERMILAB

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Xiao, M.; Capista, D.; Adams, P.

    The transfer line for beam extraction from the Recycler ring to P1 line provides a way to deliver 8 GeV kinetic energy protons from the Booster to the Delivery ring, via the Recycler, using existing beam transport lines, and without the need for new civil construction. It was designed in 2012. The kicker magnets at RR520 and the lambertson magnet at RR522 in the RR were installed in 2014 Summer Shutdown, the elements of RR to P1 Stub (permanent quads, trim quads, correctors, BPMs, the toroid at 703 and vertical bending dipole at V703 (ADCW) were installed in 2015 Summermore » Shutdown. On Tuesday, June 21, 2016, beam line from the Recycler Ring to P1 line was commissioned. The detailed results will be presented in this report.« less

  14. Interactive mechanism of working environments and construction behaviors with cognitive work analysis: an elevator installation case study.

    PubMed

    Wang, Yanqing; Chong, Heap-Yih; Liao, Pin-Chao; Ren, Hantao

    2017-09-25

    Unsafe behavior is a leading factor in accidents, and the working environment significantly affects behaviors. However, few studies have focused on detailed mechanisms for addressing unsafe behaviors resulting from environmental constraints. This study aims to delineate these mechanisms using cognitive work analysis (CWA) for an elevator installation case study. Elevator installation was selected for study because it involves operations at heights: falls from heights remain a major cause of construction worker mortality. This study adopts a mixed research approach based on three research methodology stages. This research deconstructs the details of the working environment, the workers' decision-making processes, the strategies chosen given environmental conditions and the conceptual model for workers' behaviors, which jointly depict environment-behavior mechanisms at length. By applying CWA to the construction industry, environmental constraints can easily be identified, and targeted engineering suggestions can be generated.

  15. Design and installation package for a solar powered pump

    NASA Technical Reports Server (NTRS)

    1978-01-01

    The design and installation procedures of a solar powered pump developed by Calmac Manufacturing Company are presented. Subsystem installation, operation and maintenance requirements, subsystem performance specifications, and detailed design drawings are included.

  16. The Proposed 2 MeV Electron Cooler for COSY

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Dietrich, Juergen; Parkhomchuk, Vasily V.; Reva, Vladimir B.

    2006-03-20

    The design, construction and installation of a 2 MeV electron cooling system for COSY is proposed to further boost the luminosity even with strong heating effects of high-density internal targets. In addition the design of the 2 MeV electron cooler for COSY is intended to test some new features of the high energy electron cooler for HESR at GSI. The design of the 2 MeV electron cooler will be accomplished in cooperation with the Budker Institute of Nuclear Physics in Novosibirsk, Russia. Starting with the boundary conditions of the existing electron cooler at COSY the requirements and a first generalmore » scheme of the 2 MeV electron cooler are described.« less

  17. Large-scale performance and design for construction activity erosion control best management practices.

    PubMed

    Faucette, L B; Scholl, B; Beighley, R E; Governo, J

    2009-01-01

    The National Pollutant Discharge Elimination System (NPDES) Phase II requires construction activities to have erosion and sediment control best management practices (BMPs) designed and installed for site storm water management. Although BMPs are specified on storm water pollution prevention plans (SWPPPs) as part of the construction general permit (GP), there is little evidence in the research literature as to how BMPs perform or should be designed. The objectives of this study were to: (i) comparatively evaluate the performance of common construction activity erosion control BMPs under a standardized test method, (ii) evaluate the performance of compost erosion control blanket thickness, (iii) evaluate the performance of compost erosion control blankets (CECBs) on a variety of slope angles, and (iv) determine Universal Soil Loss Equation (USLE) cover management factors (C factors) for these BMPs to assist site designers and engineers. Twenty-three erosion control BMPs were evaluated using American Society of Testing and Materials (ASTM) D-6459, standard test method for determination of ECB performance in protecting hill slopes from rainfall induced erosion, on 4:1 (H:V), 3:1, and 2:1 slopes. Soil loss reduction for treatments exposed to 5 cm of rainfall on a 2:1 slope ranged from-7 to 99%. For rainfall exposure of 10 cm, treatment soil loss reduction ranged from 8 to 99%. The 2.5 and 5 cm CECBs significantly reduced erosion on slopes up to 2:1, while CECBs < 2.5 cm are not recommended on slopes >or= 4:1 when rainfall totals reach 5 cm. Based on the soil loss results, USLE C factors ranged from 0.01 to 0.9. These performance and design criteria should aid site planners and designers in decision-making processes.

  18. End to deficit of LPG. [Argentina] (in Spanish)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Andrich, V.

    1980-03-01

    In the Buenos Aires province of Argentina, Gas de Estado is constructing the future heart of the petrochemical complex, Bahia Blanca. The complex contains 2 absorption-refrigeration plants, a gas compressing plant, equipment maintenance shops and an important operations base for the Argentine truck gas pipelines. This will be the largest LPG plant in Latin America. The General Cerri plant, under construction, is located in an area of 40,000 sq m with new installations to extract ethane and higher hydrocarbons. The design optimizes the extraction of hydrocarbons from the natural gas and recovers 76% of the ethane. Selection of the processmore » resulted from an investigation that compared the system with processes that use water cooling and absorption with refrigerated oil.« less

  19. Easily Installable Wireless Behavioral Monitoring System with Electric Field Sensor for Ordinary Houses

    PubMed Central

    Tsukamoto, S; Hoshino, H; Tamura, T

    2008-01-01

    This paper describes an indoor behavioral monitoring system for improving the quality of life in ordinary houses. It employs a device that uses weak radio waves for transmitting the obtained data and it is designed such that it can be installed by a user without requiring any technical knowledge or extra constructions. This study focuses on determining the usage statistics of home electric appliances by using an electromagnetic field sensor as a detection device. The usage of the home appliances is determined by measuring the electromagnetic field that can be observed in an area near the appliance. It is assumed that these usage statistics could provide information regarding the indoor behavior of a subject. Since the sensor is not direction sensitive and does not require precise positioning and wiring, it can be easily installed in ordinary houses by the end users. For evaluating the practicability of the sensor unit, several simple tests have been performed. The results indicate that the proposed system could be useful for collecting the usage statistics of home appliances. PMID:19415135

  20. Construction of the DHCAL

    NASA Astrophysics Data System (ADS)

    Francis, Kurt; CALICE Collaboration

    Particle Flow Algorithms (PFAs) have been proposed as a method of improving the jet energy resolution of future colliding beam detectors. PFAs require calorimeters with high granularity to enable three-dimensional imaging of events. The Calorimeter for the Linear Collider Collaboration (CALICE) is developing and testing prototypes of such highly segmented calorimeters. In this context, a large prototype of a Digital Hadron Calorimeter (DHCAL) was developed and constructed by a group led by Argonne National Laboratory. The DHCAL consists of 52 layers, instrumented with Resistive Plate Chambers (RPCs) and interleaved with steel absorber plates. The RPCs are read out by 1 x 1 cm2 pads with a 1-bit resolution (digital readout). The DHCAL prototype has approximately 480,000 readout channels. This talk reports on the design, construction and commissioning of the DHCAL. The DHCAL was installed at the Fermilab Test Beam Facility in fall 2010 and data was collected through the summer 2011.

  1. A scintillator purification plant and fluid handling system for SNO+

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ford, Richard J., E-mail: ford@snolab.ca

    A large capacity purification plant and fluid handling system has been constructed for the SNO+ neutrino and double-beta decay experiment, located 6800 feet underground at SNOLAB, Canada. SNO+ is a refurbishment of the SNO detector to fill the acrylic vessel with liquid scintillator based on Linear Alkylbenzene (LAB) and 2 g/L PPO, and also has a phase to load natural tellurium into the scintillator for a double-beta decay experiment with {sup 130}Te. The plant includes processes multi-stage dual-stream distillation, column water extraction, steam stripping, and functionalized silica gel adsorption columns. The plant also includes systems for preparing the scintillator with PPOmore » and metal-loading the scintillator for double-beta decay exposure. We review the basis of design, the purification principles, specifications for the plant, and the construction and installations. The construction and commissioning status is updated.« less

  2. Design of a cryogenic system for a 20m direct current superconducting MgB2 and YBCO power cable

    NASA Astrophysics Data System (ADS)

    Cheadle, Michael J.; Bromberg, Leslie; Jiang, Xiaohua; Glowacki, Bartek; Zeng, Rong; Minervini, Joseph; Brisson, John

    2014-01-01

    The Massachusetts Institute of Technology, the University of Cambridge in the United Kingdom, and Tsinghua University in Beijing, China, are collaborating to design, construct, and test a 20 m, direct current, superconducting MgB2 and YBCO power cable. The cable will be installed in the State Key Laboratory of Power Systems at Tsinghua University in Beijing beginning in 2013. In a previous paper [1], the cryogenic system was briefly discussed, focusing on the cryogenic issues for the superconducting cable. The current paper provides a detailed discussion of the design, construction, and assembly of the cryogenic system and its components. The two-stage system operates at nominally 80 K and 20 K with the primary cryogen being helium gas. The secondary cryogen, liquid nitrogen, is used to cool the warm stage of binary current leads. The helium gas provides cooling to both warm and cold stages of the rigid cryostat housing the MgB2 and YBCO conductors, as well as the terminations of the superconductors at the end of the current leads. A single cryofan drives the helium gas in both stages, which are thermally isolated with a high effectiveness recuperator. Refrigeration for the helium circuit is provided by a Sumitomo RDK415 cryocooler. This paper focuses on the design, construction, and assembly of the cryostat, the recuperator, and the current leads with associated superconducting cable terminations.

  3. Strong Motion Instrumentation of Seismically-Strengthened Port Structures in California by CSMIP

    USGS Publications Warehouse

    Huang, M.J.; Shakal, A.F.

    2009-01-01

    The California Strong Motion Instrumentation Program (CSMIP) has instrumented five port structures. Instrumentation of two more port structures is underway and another one is in planning. Two of the port structures have been seismically strengthened. The primary goals of the strong motion instrumentation are to obtain strong earthquake shaking data for verifying seismic analysis procedures and strengthening schemes, and for post-earthquake evaluations of port structures. The wharves instrumented by CSMIP were recommended by the Strong Motion Instrumentation Advisory Committee, a committee of the California Seismic Safety Commission. Extensive instrumentation of a wharf is difficult and would be impossible without the cooperation of the owners and the involvement of the design engineers. The instrumentation plan for a wharf is developed through study of the retrofit plans of the wharf, and the strong-motion sensors are installed at locations where specific instrumentation objectives can be achieved and access is possible. Some sensor locations have to be planned during design; otherwise they are not possible to install after construction. This paper summarizes the two seismically-strengthened wharves and discusses the instrumentation schemes and objectives. ?? 2009 ASCE.

  4. Noncontacting Laser Inspection System for Dimensional Profiling of Space Application Thermal Barriers

    NASA Technical Reports Server (NTRS)

    Taylor, Shawn C.

    2011-01-01

    A noncontacting, two-dimensional (2-D) laser inspection system has been designed and implemented to dimensionally profile thermal barriers being developed for space vehicle applications. In a vehicle as-installed state, thermal barriers are commonly compressed between load sensitive thermal protection system (TPS) panels to prevent hot gas ingestion through the panel interface during flight. Loads required to compress the thermal barriers are functions of their construction, as well as their dimensional characteristics relative to the gaps in which they are installed. Excessive loads during a mission could damage surrounding TPS panels and have catastrophic consequences. As such, accurate dimensional profiling of thermal barriers prior to use is important. Due to the compliant nature of the thermal barriers, traditional contact measurement techniques (e.g., calipers and micrometers) are subjective and introduce significant error and variability into collected dimensional data. Implementation of a laser inspection system significantly enhanced the method by which thermal barriers are dimensionally profiled, and improved the accuracy and repeatability of collected data. A statistical design of experiments study comparing laser inspection and manual caliper measurement techniques verified these findings.

  5. The NASA LeRC regenerative fuel cell system testbed program for goverment and commercial applications

    NASA Astrophysics Data System (ADS)

    Maloney, Thomas M.; Prokopius, Paul R.; Voecks, Gerald E.

    1995-01-01

    The Electrochemical Technology Branch of the NASA Lewis Research Center (LeRC) has initiated a program to develop a renewable energy system testbed to evaluate, characterize, and demonstrate fully integrated regenerative fuel cell (RFC) system for space, military, and commercial applications. A multi-agency management team, led by NASA LeRC, is implementing the program through a unique international coalition which encompasses both government and industry participants. This open-ended teaming strategy optimizes the development for space, military, and commercial RFC system technologies. Program activities to date include system design and analysis, and reactant storage sub-system design, with a major emphasis centered upon testbed fabrication and installation and testing of two key RFC system components, namely, the fuel cells and electrolyzers. Construction of the LeRC 25 kW RFC system testbed at the NASA-Jet Propulsion Labortory (JPL) facility at Edwards Air Force Base (EAFB) is nearly complete and some sub-system components have already been installed. Furthermore, planning for the first commercial RFC system demonstration is underway.

  6. Mechanically tunable elastomeric hydrogels made from melt-fabricated photoreactive block copolymer micelles

    NASA Astrophysics Data System (ADS)

    Huq, Nabila; Bailey, Travis

    Recently, our group has developed a range of novel elastomeric hydrogels using thermoplastic elastomer design concepts. These have been traditionally formed using two-component blends of AB diblock and ABA triblock copolymer designed to self-assemble into micelle-like domains in the melt. Vitrification of the micelle cores (A blocks) followed by swelling in aqueous media leads to an elastic network of spheres tethered by the population of bridging ABA chains in the blend. The concentration of ABA used has a strong influence on the mechanical properties exhibited by the hydrogels. We have built on this by replacing the traditional AB with a photoreactive AB-p. This construct provides flexibility to install specific concentrations of ABA tethering molecules at any point in the fabrication process as well as at any location simply through intensity-controlled, spatially directed irradiation with UV light. Increasing UV exposure time results in greater ABA concentrations, reinforcing the area of exposure. In this presentation we explore the influence of patterned ABA installation on shape, surface topography, and mechanical properties of the resulting hydrogels.

  7. Space Shuttle Projects

    NASA Image and Video Library

    2002-03-07

    STS-109 Astronaut Michael J. Massimino, mission specialist, perched on the Shuttle's robotic arm, is preparing to install the Electronic Support Module (ESM) in the aft shroud of the Hubble Space telescope (HST), with the assistance of astronaut James H. Newman (out of frame). The module will support a new experimental cooling system to be installed during the next day's fifth and final space walk of the mission. That cooling system is designed to bring the telescope's Near-Infrared Camera and Multi Spectrometer (NICMOS) back to life the which had been dormant since January 1999 when its original coolant ran out. The Space Shuttle Columbia STS-109 mission lifted off March 1, 2002 with goals of repairing and upgrading the Hubble Space Telescope (HST). The Marshall Space Flight Center in Huntsville, Alabama had the responsibility for the design, development, and construction of the HST, which is the most powerful and sophisticated telescope ever built. In addition to the installation of the experimental cooling system for the Hubble's Near-Infrared Camera and NICMOS, STS-109 upgrades to the HST included replacement of the solar array panels, replacement of the power control unit (PCU), and replacement of the Faint Object Camera (FOC) with a new advanced camera for Surveys (ACS). Lasting 10 days, 22 hours, and 11 minutes, the STS-109 mission was the 108th flight overall in NASA's Space Shuttle Program.

  8. Carbon Mineralization by Aqueous Precipitation for Beneficial Use of CO2 from Flue Gas

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Devenney, Martin; Gilliam, Ryan; Seeker, Randy

    2013-08-01

    The objective of this project is to demonstrate an innovative process to mineralize CO2 from flue gas directly to reactive carbonates and maximize the value and versatility of its beneficial use products. The program scope includes the design, construction, and testing of a CO2 Conversion to Material Products (CCMP) Pilot Demonstration Plant utilizing CO2 from the flue gas of a power production facility in Moss Landing, CA. This topical report covers Subphase 2a which is the design phase of pilot demonstration subsystems. Materials of construction have been selected and proven in both lab scale and prototype testing to be acceptablemore » for the reagent conditions of interest. The target application for the reactive carbonate material has been selected based upon small-scale feasibility studies and the design of a continuous fiber board production line has been completed. The electrochemical cell architecture and components have been selected based upon both lab scale and prototype testing. The appropriate quality control and diagnostic techniques have been developed and tested along with the required instrumentation and controls. Finally the demonstrate site infrastructure, NEPA categorical exclusion, and permitting is all ready for the construction and installation of the new units and upgrades.« less

  9. IFMIF: overview of the validation activities

    NASA Astrophysics Data System (ADS)

    Knaster, J.; Arbeiter, F.; Cara, P.; Favuzza, P.; Furukawa, T.; Groeschel, F.; Heidinger, R.; Ibarra, A.; Matsumoto, H.; Mosnier, A.; Serizawa, H.; Sugimoto, M.; Suzuki, H.; Wakai, E.

    2013-11-01

    The Engineering Validation and Engineering Design Activities (EVEDA) for the International Fusion Materials Irradiation Facility (IFMIF), an international collaboration under the Broader Approach Agreement between Japan Government and EURATOM, aims at allowing a rapid construction phase of IFMIF in due time with an understanding of the cost involved. The three main facilities of IFMIF (1) the Accelerator Facility, (2) the Target Facility and (3) the Test Facility are the subject of validation activities that include the construction of either full scale prototypes or smartly devised scaled down facilities that will allow a straightforward extrapolation to IFMIF needs. By July 2013, the engineering design activities of IFMIF matured with the delivery of an Intermediate IFMIF Engineering Design Report (IIEDR) supported by experimental results. The installation of a Linac of 1.125 MW (125 mA and 9 MeV) of deuterons started in March 2013 in Rokkasho (Japan). The world's largest liquid Li test loop is running in Oarai (Japan) with an ambitious experimental programme for the years ahead. A full scale high flux test module that will house ∼1000 small specimens developed jointly in Europe and Japan for the Fusion programme has been constructed by KIT (Karlsruhe) together with its He gas cooling loop. A full scale medium flux test module to carry out on-line creep measurement has been validated by CRPP (Villigen).

  10. 46 CFR 151.40-5 - Construction.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 5 2013-10-01 2013-10-01 false Construction. 151.40-5 Section 151.40-5 Shipping COAST... LIQUID HAZARDOUS MATERIAL CARGOES Temperature or Pressure Control Installations § 151.40-5 Construction. Construction of machinery or equipment, such as heat exchangers, condensers, piping, etc., associated with...

  11. 46 CFR 151.40-5 - Construction.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 5 2010-10-01 2010-10-01 false Construction. 151.40-5 Section 151.40-5 Shipping COAST... LIQUID HAZARDOUS MATERIAL CARGOES Temperature or Pressure Control Installations § 151.40-5 Construction. Construction of machinery or equipment, such as heat exchangers, condensers, piping, etc., associated with...

  12. 46 CFR 151.40-5 - Construction.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 5 2014-10-01 2014-10-01 false Construction. 151.40-5 Section 151.40-5 Shipping COAST... LIQUID HAZARDOUS MATERIAL CARGOES Temperature or Pressure Control Installations § 151.40-5 Construction. Construction of machinery or equipment, such as heat exchangers, condensers, piping, etc., associated with...

  13. 46 CFR 151.40-5 - Construction.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 5 2011-10-01 2011-10-01 false Construction. 151.40-5 Section 151.40-5 Shipping COAST... LIQUID HAZARDOUS MATERIAL CARGOES Temperature or Pressure Control Installations § 151.40-5 Construction. Construction of machinery or equipment, such as heat exchangers, condensers, piping, etc., associated with...

  14. 46 CFR 151.40-5 - Construction.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 5 2012-10-01 2012-10-01 false Construction. 151.40-5 Section 151.40-5 Shipping COAST... LIQUID HAZARDOUS MATERIAL CARGOES Temperature or Pressure Control Installations § 151.40-5 Construction. Construction of machinery or equipment, such as heat exchangers, condensers, piping, etc., associated with...

  15. 40 CFR 62.14351 - Definitions.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Solid Waste Landfills That Commenced Construction Prior to May 30, 1991 and Have Not Been Modified or... construction on the horizontal or vertical expansion. Municipal solid waste landfill or MSW landfill means an... construction or installation of the collection and control system. Complete on-site construction means that all...

  16. 40 CFR 62.14356 - Compliance schedules and increments of progress.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... POLLUTANTS Federal Plan Requirements for Municipal Solid Waste Landfills That Commenced Construction Prior to...) to initiate on-site construction or initiate on-site installation of emission collection and/or control equipment. (3) Initiate on-site construction: Initiate on-site construction or initiate on-site...

  17. 40 CFR 62.14351 - Definitions.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Solid Waste Landfills That Commenced Construction Prior to May 30, 1991 and Have Not Been Modified or... construction on the horizontal or vertical expansion. Municipal solid waste landfill or MSW landfill means an... construction or installation of the collection and control system. Complete on-site construction means that all...

  18. 40 CFR 62.14356 - Compliance schedules and increments of progress.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... POLLUTANTS Federal Plan Requirements for Municipal Solid Waste Landfills That Commenced Construction Prior to...) to initiate on-site construction or initiate on-site installation of emission collection and/or control equipment. (3) Initiate on-site construction: Initiate on-site construction or initiate on-site...

  19. Crushable barrier blocks installed : research notes.

    DOT National Transportation Integrated Search

    1997-09-01

    The Oregon Department of Transportation : is testing another low cost life : saving device. On September 9, 1997, : an ADIEM II concrete barrier end : terminal was installed on I-5 south of : Salem, at the Delaney Road : overcrossing construction pro...

  20. Installation of a Low Flow Unit at the Abiquiu Hydroelectric Facility

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Jack Q. Richardson

    2012-06-28

    Final Technical Report for the Recovery Act Project for the Installation of a Low Flow Unit at the Abiquiu Hydroelectric Facility. The Abiquiu hydroelectric facility existed with two each 6.9 MW vertical flow Francis turbine-generators. This project installed a new 3.1 MW horizontal flow low flow turbine-generator. The total plant flow range to capture energy and generate power increased from between 250 and 1,300 cfs to between 75 and 1,550 cfs. Fifty full time equivalent (FTE) construction jobs were created for this project - 50% (or 25 FTE) were credited to ARRA funding due to the ARRA 50% project costmore » match. The Abiquiu facility has increased capacity, increased efficiency and provides for an improved aquatic environment owing to installed dissolved oxygen capabilities during traditional low flow periods in the Rio Chama. A new powerhouse addition was constructed to house the new turbine-generator equipment.« less

Top