Sample records for designing constructing operating

  1. 10 CFR Appendix N to Part 52 - Standardization of Nuclear Power Plant Designs: Combined Licenses To Construct and Operate...

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... Licenses To Construct and Operate Nuclear Power Reactors of Identical Design at Multiple Sites N Appendix N... Designs: Combined Licenses To Construct and Operate Nuclear Power Reactors of Identical Design at Multiple... construct and operate nuclear power reactors of identical design (“common design”) to be located at multiple...

  2. Design, construction and operation features of high-rise structures

    NASA Astrophysics Data System (ADS)

    Mylnik, Alexey; Mylnik, Vladimir; Zubeeva, Elena; Mukhamedzhanova, Olga

    2018-03-01

    The article considers design, construction and operation features of high-rise facilities. The analysis of various situations, that come from improper designing, construction and operation of unique facilities, is carried out. The integrated approach is suggested, when the problems of choosing acceptable constructional solutions related to the functional purpose, architectural solutions, methods of manufacturing and installation, operating conditions for unique buildings and structures are being tackled. A number of main causes for the emergency destruction of objects under construction and operation is considered. A number of measures are proposed on the basis of factor classification in order to efficiently prevent the situations, when various negative options of design loads and emergency impacts occur.

  3. 10 CFR Appendix N to Part 50 - Standardization of Nuclear Power Plant Designs: Permits To Construct and Licenses To Operate...

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... Construct and Licenses To Operate Nuclear Power Reactors of Identical Design at Multiple Sites N Appendix N... Construct and Licenses To Operate Nuclear Power Reactors of Identical Design at Multiple Sites Section 101... nuclear power reactors of essentially the same design to be located at different sites. 1 1 If the design...

  4. 10 CFR Appendix N to Part 50 - Standardization of Nuclear Power Plant Designs: Permits To Construct and Licenses To Operate...

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... Construct and Licenses To Operate Nuclear Power Reactors of Identical Design at Multiple Sites N Appendix N... Construct and Licenses To Operate Nuclear Power Reactors of Identical Design at Multiple Sites Section 101... nuclear power reactors of essentially the same design to be located at different sites. 1 1 If the design...

  5. 10 CFR Appendix N to Part 50 - Standardization of Nuclear Power Plant Designs: Permits To Construct and Licenses To Operate...

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... Construct and Licenses To Operate Nuclear Power Reactors of Identical Design at Multiple Sites N Appendix N... Construct and Licenses To Operate Nuclear Power Reactors of Identical Design at Multiple Sites Section 101... nuclear power reactors of essentially the same design to be located at different sites. 1 1 If the design...

  6. 10 CFR Appendix N to Part 50 - Standardization of Nuclear Power Plant Designs: Permits To Construct and Licenses To Operate...

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Construct and Licenses To Operate Nuclear Power Reactors of Identical Design at Multiple Sites N Appendix N... FACILITIES Pt. 50, App.N Appendix N to Part 50—Standardization of Nuclear Power Plant Designs: Permits To..., apply to construction permits and operating licenses subject to this appendix N. 2. Applications for...

  7. 23 CFR 625.3 - Application.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION ENGINEERING AND TRAFFIC OPERATIONS DESIGN STANDARDS FOR HIGHWAYS § 625.3 Application. (a) Applicable Standards. (1) Design and construction standards for...) Federal-aid projects not on the NHS are to be designed, constructed, operated, and maintained in...

  8. 23 CFR 625.3 - Application.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION ENGINEERING AND TRAFFIC OPERATIONS DESIGN STANDARDS FOR HIGHWAYS § 625.3 Application. (a) Applicable Standards. (1) Design and construction standards for...) Federal-aid projects not on the NHS are to be designed, constructed, operated, and maintained in...

  9. 23 CFR 625.3 - Application.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION ENGINEERING AND TRAFFIC OPERATIONS DESIGN STANDARDS FOR HIGHWAYS § 625.3 Application. (a) Applicable Standards. (1) Design and construction standards for...) Federal-aid projects not on the NHS are to be designed, constructed, operated, and maintained in...

  10. 23 CFR 625.3 - Application.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION ENGINEERING AND TRAFFIC OPERATIONS DESIGN STANDARDS FOR HIGHWAYS § 625.3 Application. (a) Applicable Standards. (1) Design and construction standards for...) Federal-aid projects not on the NHS are to be designed, constructed, operated, and maintained in...

  11. 40 CFR 264.1 - Purpose, scope and applicability.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... owner/operator must design, construct, operate, and maintain a unit within a 100-year floodplain to... procedures must address proper design, construction, maintenance, and operation of remediation waste..., the location of all records within the facility, and the facility layout. In addition, this person...

  12. 40 CFR 264.1 - Purpose, scope and applicability.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... owner/operator must design, construct, operate, and maintain a unit within a 100-year floodplain to... procedures must address proper design, construction, maintenance, and operation of remediation waste..., the location of all records within the facility, and the facility layout. In addition, this person...

  13. 40 CFR 264.1 - Purpose, scope and applicability.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... owner/operator must design, construct, operate, and maintain a unit within a 100-year floodplain to... procedures must address proper design, construction, maintenance, and operation of remediation waste..., the location of all records within the facility, and the facility layout. In addition, this person...

  14. 40 CFR 125.94 - How will requirements reflecting best technology available for minimizing adverse environmental...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... construction, operational, maintenance, monitoring, and adaptive management requirements of a Technology... the Director that your existing design and construction technologies, operational measures, and/or..., operational measures, and/or restoration measures that will, in combination with any existing design and...

  15. 40 CFR 265.254 - Design and operating requirements.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... DISPOSAL FACILITIES Waste Piles § 265.254 Design and operating requirements. The owner or operator of each new waste pile on which construction commences after January 29, 1992, each lateral expansion of a waste pile unit on which construction commences after July 29, 1992, and each such replacement of an...

  16. 29 CFR 1926.705 - Requirements for lift-slab construction operations.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... operations shall be designed and planned by a registered professional engineer who has experience in lift-slab construction. Such plans and designs shall be implemented by the employer and shall include detailed instructions and sketches indicating the prescribed method of erection. These plans and designs...

  17. 29 CFR 1926.705 - Requirements for lift-slab construction operations.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... operations shall be designed and planned by a registered professional engineer who has experience in lift-slab construction. Such plans and designs shall be implemented by the employer and shall include detailed instructions and sketches indicating the prescribed method of erection. These plans and designs...

  18. 29 CFR 1926.705 - Requirements for lift-slab construction operations.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... operations shall be designed and planned by a registered professional engineer who has experience in lift-slab construction. Such plans and designs shall be implemented by the employer and shall include detailed instructions and sketches indicating the prescribed method of erection. These plans and designs...

  19. 29 CFR 1926.705 - Requirements for lift-slab construction operations.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... operations shall be designed and planned by a registered professional engineer who has experience in lift-slab construction. Such plans and designs shall be implemented by the employer and shall include detailed instructions and sketches indicating the prescribed method of erection. These plans and designs...

  20. 29 CFR 1926.705 - Requirements for lift-slab construction operations.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... operations shall be designed and planned by a registered professional engineer who has experience in lift-slab construction. Such plans and designs shall be implemented by the employer and shall include detailed instructions and sketches indicating the prescribed method of erection. These plans and designs...

  1. 18 CFR 4.96 - Amendment of exemption.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... design, location, method of construction or operation of its project, it must first notify the..., location, method of construction or operation of the project, the exemption holder may implement the..., method of construction or the operation of the project works, the exemption holder may not implement the...

  2. 49 CFR 230.66 - Design, construction, and maintenance.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION STEAM LOCOMOTIVE INSPECTION AND MAINTENANCE STANDARDS Steam Locomotives and Tenders § 230.66 Design, construction, and maintenance. The steam locomotive owner and operator are responsible for the general design, construction and maintenance of the steam locomotives and...

  3. A Training Manual in Conducting a Workshop in the Design, Construction, Operation, Maintenance and Repair of Hydrams.

    ERIC Educational Resources Information Center

    Peace Corps, Washington, DC. Office of Programming and Training Coordination.

    This manual presents a comprehensive training design, suggested procedures, and materials for conducting a workshop in the design, construction, operation, maintenance, and repair of hydrams, and in the planning and implementation of hydram projects. Hydrams (hydraulic rams, hydraulic ram pumps, automatic hydraulic ram pumps, rams) are devices…

  4. 18 CFR 4.104 - Amendment of exemption.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... change the design, location, method of construction or operation of its project, it must first notify the..., location, method of construction or operation of the project, the exemption holder may implement the..., method of construction or the operation of the project works, the exemption holder may not implement the...

  5. Healthy Swimming/Recreational Water

    MedlinePlus

    ... the Pool Raccoons & Pools Birds & Pools Aquatics Professionals Design & Construction Designing Public Swimming Facilities Historic CDC Design & Operation Manuals Operation & Maintenance 12 Steps for Prevention ...

  6. Health Benefits of Water-based Exercise

    MedlinePlus

    ... the Pool Raccoons & Pools Birds & Pools Aquatics Professionals Design & Construction Designing Public Swimming Facilities Historic CDC Design & Operation Manuals Operation & Maintenance 12 Steps for Prevention ...

  7. Design, Construction, and Test of a 473 MHZ Four - Cavity Rfq.

    NASA Astrophysics Data System (ADS)

    Kazimi, Reza

    1992-01-01

    An RFQ accelerator using the new four-rod cavity design has been fabricated and successfully tested at Texas Accelerator Center. The RFQ is designed to accelerate a 10 mA H^- ion beam from 30 keV to 500 keV with the operating frequency of 473 MHz. This new type of RFQ structure not only promises simplicity of design, construction, and operation, but also can be manufactured to operate at higher frequencies than previously achieved by other four-rod type RFQs. Combination of simplicity and compactness due to higher operating frequencies (400 to 500 MHz) makes the design desirable for injector of proton accelerators, medical linear accelerators, and variety of other applications. This dissertation presents the steps I went through in inventing, developing, and experimentally testing this new RFQ design. First an introduction to accelerators is given, and the basic accelerator physics terminologies are defined. The principles of operations of the RFQs are described, and the theory behind new type of RFQ structure is explained. Then the beam dynamics and cavity design of the RFQ are presented. Finally, the mechanical design and construction procedure are discussed, and experimental results of rf tests and actual H ^- beam test are given.

  8. National Dam Safety Program. Wappingers Falls Dam (I.D. Number N.Y. 3, D.E.C. 613A), Hudson River Basin, Dutchess County, New York. Phase 1 Inspection Report

    DTIC Science & Technology

    1980-09-30

    Classification 2I e. Ownership 2f. Purpose of Dam 2 g. Design and Construction History 2h. Normal Operating Procedure 2 1.3 PERTINENT DATA 2 a. Drainage...4 2.2 SUBSURFACE INVESTIGATION 4 2.3 DAM AND APPURTENANT STRUCTURES 4 2.4 CONSTRUCTION RECORDS 4 2.5 OPERATION RECORDS 2.6 EVALUATION OF DATA 5 4...12 a. Visual Observations 12 b. Design and Construction Data 12 c. Stability Analysis 12 d. Operating Records 13 e. Post- Construction Changes 13 f

  9. Economic Evaluation of Building Design, Construction, Operation and Maintenance. Seminar Workbook.

    ERIC Educational Resources Information Center

    Ruegg, Rosalie T.

    This workbook has been prepared for participants in the seminar, "Economic Evaluation of Building Design, Construction, Operation and Maintenance." It has two main functions: (1) to provide basic resource materials, references, and introductions to methods employed in the seminar; and (2) to provide instructional problems for solution by…

  10. Studies of uranium-sodium suspensions. Part I. Construction and operation of experimental loop

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bett, F L; Hilditch, R J; Mepham, R G

    1961-08-01

    An experimnental uranium- sodium suspension loop was operated for 4320 hr. The design, construction, commissioning, and operation of the loop to the point where a comnplete stable suspension was obtained is described.

  11. 23 CFR 652.13 - Design and construction criteria.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 23 Highways 1 2011-04-01 2011-04-01 false Design and construction criteria. 652.13 Section 652.13 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION ENGINEERING AND TRAFFIC OPERATIONS PEDESTRIAN AND BICYCLE ACCOMMODATIONS AND PROJECTS § 652.13 Design and construction criteria. (a) The American Association of State Highway and...

  12. 10 CFR Appendix N to Part 52 - Standardization of Nuclear Power Plant Designs: Combined Licenses To Construct and Operate...

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 10 Energy 2 2013-01-01 2013-01-01 false Standardization of Nuclear Power Plant Designs: Combined Licenses To Construct and Operate Nuclear Power Reactors of Identical Design at Multiple Sites N Appendix N to Part 52 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSES, CERTIFICATIONS, AND APPROVALS FOR NUCLEAR POWER PLANTS Pt. 52, App. N...

  13. 10 CFR Appendix N to Part 52 - Standardization of Nuclear Power Plant Designs: Combined Licenses To Construct and Operate...

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 10 Energy 2 2014-01-01 2014-01-01 false Standardization of Nuclear Power Plant Designs: Combined Licenses To Construct and Operate Nuclear Power Reactors of Identical Design at Multiple Sites N Appendix N to Part 52 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSES, CERTIFICATIONS, AND APPROVALS FOR NUCLEAR POWER PLANTS Pt. 52, App. N...

  14. Conceptual design and analysis of roads and road construction machinery for initial lunar base operations

    NASA Technical Reports Server (NTRS)

    Sines, Jeffrey L.; Banks, Joel; Efatpenah, Keyanoush

    1990-01-01

    Recent developments have made it possible for scientists and engineers to consider returning to the Moon to build a manned lunar base. The base can be used to conduct scientific research, develop new space technology, and utilize the natural resources of the Moon. Areas of the base will be separated, connected by a system of roads that reduce the power requirements of vehicles traveling on them. Feasible road types for the lunar surface were analyzed and a road construction system was designed for initial lunar base operations. A model was also constructed to show the system configuration and key operating features. The alternate designs for the lunar road construction system were developed in four stages: analyze and select a road type; determine operations and machinery needed to produce the road; develop machinery configurations; and develop alternates for several machine components. A compacted lunar soil road was selected for initial lunar base operations. The only machinery required to produce this road were a grader and a compactor. The road construction system consists of a main drive unit which is used for propulsion, a detachable grader assembly, and a towed compactor.

  15. Space station system analysis study. Part 3: Documentation. Volume 2: Technical report. [structural design and construction

    NASA Technical Reports Server (NTRS)

    1977-01-01

    An analysis of construction operation is presented as well as power system sizing requirements. Mission hardware requirements are reviewed in detail. Space construction base and design configurations are also examined.

  16. (US low-level radioactive waste management facility design, construction, and operation): Foreign trip report, July 22--30, 1989

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Van Hoesen, S.D.; Bolinsky, J.

    1989-08-02

    The Martin Marietta Energy Systems, Inc., Team, consisting of representatives of the Engineering Division and Oak Ridge National Laboratory (ORNL), participated in a technology exchange program on French and US low-level radioactive waste (LLW) management facility design, construction, and operation. Meetings were held at the Agence National pour la Gestion des Dechets Radioactif (ANDRA) offices in Paris to review the designs for the new French LLW disposal facility, the Cente de Stockage de l'Aube (CSA), and the new ORNL LLW disposal project, the Interim Waste Management Facility (IWMF), and the results of the French LLW disposal facility cover experiment atmore » St. Sauveur. Visits were made to the operating LLW disposal facility, the Centre de Stockage de la Manche (CSM), the LLW conditioning facilities at the La Hague Reprocessing Facility, and the St. Saueveur Disposal Cap Experiment to discuss design, construction, and operating experience. A visit was also made to the CSA site to view the progress made in construction of the new facility.« less

  17. 10 CFR Appendix N to Part 50 - Standardization of Nuclear Power Plant Designs: Permits To Construct and Licenses To Operate...

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 10 Energy 1 2014-01-01 2014-01-01 false Standardization of Nuclear Power Plant Designs: Permits To Construct and Licenses To Operate Nuclear Power Reactors of Identical Design at Multiple Sites N Appendix N to Part 50 Energy NUCLEAR REGULATORY COMMISSION DOMESTIC LICENSING OF PRODUCTION AND UTILIZATION FACILITIES Pt. 50, App. N Appendix N to Par...

  18. National Program for Inspection of Non-Federal Dams. Keyser Dam (VT 00097), Connecticut River Basin, Chelsea, Vermont. Phase I Inspection Report.

    DTIC Science & Technology

    1980-04-01

    CARNEY M. TERZIAN, HENBER I Design Branch Engineering Division RICHARD DIB * Water Control Branch Engineering Division [ hPIPWVAL 220ininu: Chief...2 f. Operator 2 I g. Purpose of Dam 2 h. Design and Construction History 2 i. Normal Operational Procedure 2 1.3 Pertinent Data 2 a. Drainage...i. Spillway 5 J. Regulating Outlets 5 [I h] Section Page 2. ENGINEERING DATA 6 2.1 Design Data 6 2.2 Construction Data 6 2.3 Operation Data 6 2.4

  19. A Theoretical and Empirical Comparison of Three Approaches to Achievement Testing.

    ERIC Educational Resources Information Center

    Haladyna, Tom; Roid, Gale

    Three approaches to the construction of achievement tests are compared: construct, operational, and empirical. The construct approach is based upon classical test theory and measures an abstract representation of the instructional objectives. The operational approach specifies instructional intent through instructional objectives, facet design,…

  20. Winter Weather Response Guide

    DOT National Transportation Integrated Search

    2012-10-01

    The Texas Department of Transportation (TxDOT) has been given statutory authority for the : planning, design, construction, operation, and maintenance of the State Highway System. With : few new highways being constructed, the operation and maintenan...

  1. The embedded operating system project

    NASA Technical Reports Server (NTRS)

    Campbell, R. H.

    1984-01-01

    This progress report describes research towards the design and construction of embedded operating systems for real-time advanced aerospace applications. The applications concerned require reliable operating system support that must accommodate networks of computers. The report addresses the problems of constructing such operating systems, the communications media, reconfiguration, consistency and recovery in a distributed system, and the issues of realtime processing. A discussion is included on suitable theoretical foundations for the use of atomic actions to support fault tolerance and data consistency in real-time object-based systems. In particular, this report addresses: atomic actions, fault tolerance, operating system structure, program development, reliability and availability, and networking issues. This document reports the status of various experiments designed and conducted to investigate embedded operating system design issues.

  2. Manual handling of highway kerbs--focus group findings.

    PubMed

    Bust, P D; Gibb, A G F; Haslam, R A

    2005-07-01

    The manual handling of concrete highway kerbs remains commonplace in the construction industry despite obvious risks to operatives. This study was undertaken to find out why kerb installation still includes manual handling, to identify the alternatives that exist and to consider how the organisation of the work affects exposure to risk. Focus groups were held with industry professionals to discuss kerb design, installation and the training of operatives, with site visits and interviews undertaken to place the focus group findings in context. The focus group discussions highlighted manufacturer's "myopia", a lack of installation knowledge of designers and shortfalls in training for installation work. It was concluded that risks to the health of construction workers remain as they are not considered in the design of the product, design of the work or ameliorated by adequate risk assessment. Recommendations from the research are that a pro-active approach to health needs to be adopted by the manufacturers of heavy construction products. Designers of work requiring the use of heavy products need to have more experience of site operations, and education and training in manual handling is desirable at all levels in construction organisations.

  3. 40 CFR 125.98 - As the Director, what must I do to comply with the requirements of this subpart?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... technologies, operational measures, or restoration measures should be included in the permit to meet the... evaluate the performance of the design and construction technologies, operational measures, and/or... construction technologies, operational measure, and/or restoration measures, and/or improved operation and...

  4. 47 CFR 25.113 - Station construction, launch authority, and operation of spare satellites.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... this part, and technical design requirements. Prior to commencing such construction and pre-operational... specify the frequencies the licensee proposes to use for pre-operational testing and the name, address... resulting from such testing. MSS/ATC licensees engaging in pre-operational testing must comply with §§ 5.83...

  5. 40 CFR 49.143 - Construction and operational control measures.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ...: (i) An operating system designed to recover and inject all the produced natural gas into a natural... closed-vent system to: (i) An operating system designed to recover and inject the natural gas emissions... that pipeline injection of all or part of the natural gas collected in an operating system designed to...

  6. 40 CFR 49.143 - Construction and operational control measures.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ...: (i) An operating system designed to recover and inject all the produced natural gas into a natural... closed-vent system to: (i) An operating system designed to recover and inject the natural gas emissions... that pipeline injection of all or part of the natural gas collected in an operating system designed to...

  7. 40 CFR 49.4164 - Construction and operational control measures.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... closed-vent system to: (i) An operating system designed to recover and inject all the produced natural... through a closed-vent system to: (i) An operating system designed to recover and inject the natural gas... operating system designed to recover and inject natural gas becomes temporarily infeasible and there is no...

  8. 40 CFR 49.4164 - Construction and operational control measures.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... closed-vent system to: (i) An operating system designed to recover and inject all the produced natural... through a closed-vent system to: (i) An operating system designed to recover and inject the natural gas... operating system designed to recover and inject natural gas becomes temporarily infeasible and there is no...

  9. New Technical Solution for Vertical Shaft Equipping Using Steel Headframe of Multifunction Purpose

    NASA Astrophysics Data System (ADS)

    Kassikhina, Elena; Pershin, Vladimir; Glazkov, Yurij

    2017-11-01

    The article reviews a novel approach to the design of steel angle headframe for vertical shafts of coal and ore mines on the basis of rational design solutions. Practice of construction of coal and ore mines provides application of various designs for steel angle headframes which are divided into separate large assembly blocks and constructive elements during assembling operations. Design of these blocks and elements, their weight and dimensions effect the chose of the method of assembling on which economic and technological indicators, as well as duration of down-time, depend on during performance of construction operations in shaft. The technical solution on equipment provision for mine vertical shaft using headframe of multifunctional purpose will allow changing the management construction of vertical shaft. The constructive design of the headgear allows application of the effective method of assembly and thus to provide improvement of the technical and economic indexes, and high calendar time rate of the shaft construction due to reduction of duration of works on equipment provision for the shaft and to refurbishment of the shaft in order to carry out horizontal mining.

  10. Design and Field Test of a Mass Efficient Crane for Lunar Payload Handling and Inspection: The Lunar Surface Manipulation System

    NASA Technical Reports Server (NTRS)

    Doggett, William R.; King, Bruce D.; Jones, Thomas Carno; Dorsey, John T.; Mikulas, Martin M.

    2008-01-01

    Devices for lifting, translating and precisely placing payloads are critical for efficient Earthbased construction operations. Both recent and past studies have demonstrated that devices with similar functionality will be needed to support lunar outpost operations. Lunar payloads include: a) prepackaged hardware and supplies which must be unloaded from landers and then accurately located at their operational site, b) sensor packages used for periodic inspection of landers, habitat surfaces, etc., and c) local materials such as regolith which require grading, excavation and placement. Although several designs have been developed for Earth based applications, these devices lack unique design characteristics necessary for transport to and use on the harsh lunar surface. These design characteristics include: a) composite components, b) compact packaging for launch, c) simple in-field reconfiguration and repair, and d) support for tele-operated or automated operations. Also, in contrast to Earth-based construction, where special purpose devices dominate a construction site, a lunar outpost will require versatile devices which provide operational benefit from initial construction through sustained operations. This paper will detail the design of a unique, high performance, versatile lifting device designed for operations on the lunar surface. The device is called the Lunar Surface Manipulation System to highlight the versatile nature of the device which supports conventional cable suspended crane operations as well as operations usually associated with a manipulator such as precise positioning where the payload is rigidly grappled by a tool attached to the tip of the device. A first generation test-bed to verify design methods and operational procedures is under development at the NASA Langley Research Center and recently completed field tests at Moses Lake Washington. The design relied on non-linear finite element analysis which is shown to correlate favorably with laboratory experiments. A key design objective, reviewed in this paper, is the device s simplicity, resulting from a focus on the minimum set of functions necessary to perform payload offload. Further development of the device has the potential for significant mass savings, with a high performance device incorporating composite elements estimated to have a mass less than 3% of the mass of the maximum lunar payload lifted at the tip. The paper will conclude with future plans for expanding the operational versatility of the device.

  11. Prepare to protect: Operating and maintaining a tornado safe room.

    PubMed

    Herseth, Andrew; Goldsmith-Grinspoon, Jennifer; Scott, Pataya

    2017-06-01

    Operating and maintaining a tornado safe room can be critical to the effective continuity of business operations because a firm's most valuable asset is its people. This paper describes aspects of operations and maintenance (O&M) for existing tornado safe rooms as well as a few planning and design aspects that affect the ultimate operation of a safe room for situations where a safe room is planned, but not yet constructed. The information is based on several Federal Emergency Management Agency safe room publications that provide guidance on emergency management and operations, as well as the design and construction of tornado safe rooms.

  12. EOS: A project to investigate the design and construction of real-time distributed embedded operating systems

    NASA Technical Reports Server (NTRS)

    Campbell, R. H.; Essick, R. B.; Grass, J.; Johnston, G.; Kenny, K.; Russo, V.

    1986-01-01

    The EOS project is investigating the design and construction of a family of real-time distributed embedded operating systems for reliable, distributed aerospace applications. Using the real-time programming techniques developed in co-operation with NASA in earlier research, the project staff is building a kernel for a multiple processor networked system. The first six months of the grant included a study of scheduling in an object-oriented system, the design philosophy of the kernel, and the architectural overview of the operating system. In this report, the operating system and kernel concepts are described. An environment for the experiments has been built and several of the key concepts of the system have been prototyped. The kernel and operating system is intended to support future experimental studies in multiprocessing, load-balancing, routing, software fault-tolerance, distributed data base design, and real-time processing.

  13. Construction, Startup and Operation of a New LLRW Disposal Facility in Andrews County, Texas - 12151

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Van Vliet, James A.

    2012-07-01

    During this last year, Waste Control Specialists LLC (WCS) completed construction and achieved start of operations of a new low level radioactive waste (LLRW) disposal facility in Andrews County Texas. Disposal operations are underway for commercial LLRW, and start up evolutions are in progress for disposal of Department of Energy (DOE) LLRW. The overall approach to construction and start up are presented as well as some of the more significant challenges and how they were addressed to achieve initial operations of the first new commercial low level radioactive waste disposal facility in more than 30 years. The WCS disposal facilitymore » consists of two LLRW disposal cells, one for Texas Compact waste, and a separate disposal cell for DOE waste. Both disposal cells have very robust and unique designs. The cells themselves are constructed entirely in very low permeability red bed clay. The cell liners include a 0.91 meter thick clay liner meeting unprecedented permeability limits, 0.3 meter thick reinforced concrete barriers, as well as the standard geo-synthetic liners. Actions taken to meet performance criteria and install these liners will be discussed. Consistent with this highly protective landfill design, WCS chose to install a zero discharge site water management system. The considerations behind the design and construction of this system will be presented. Other activities essential to successful start of LLRW disposal operations included process and procedure development and refinement, staffing and staff development, and training. Mock ups were built and used for important evolutions and functions. Consistent with the extensive regulation of LLRW operations, engagement with the Texas Commission on Environmental Quality (TCEQ) was continuous and highly interactive. This included daily activity conference calls, weekly coordination calls and numerous topical conference calls and meetings. TCEQ staff and consultants frequently observed specific construction evolutions, such as geological feature mapping of designated excavation faces, disposal cell clay liner installation, disposal cell concrete barrier construction, etc. (author)« less

  14. 28 CFR 91.3 - General eligibility requirements.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... construct, develop, expand, operate or improve correctional facilities to ensure that secure space is..., development, expansion, modification, operation or improvement of correctional facilities designed to ensure... of the multi-state compact agreement that specifies the construction, development, expansion...

  15. 28 CFR 91.3 - General eligibility requirements.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... construct, develop, expand, operate or improve correctional facilities to ensure that secure space is..., development, expansion, modification, operation or improvement of correctional facilities designed to ensure... of the multi-state compact agreement that specifies the construction, development, expansion...

  16. 28 CFR 91.3 - General eligibility requirements.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... construct, develop, expand, operate or improve correctional facilities to ensure that secure space is..., development, expansion, modification, operation or improvement of correctional facilities designed to ensure... of the multi-state compact agreement that specifies the construction, development, expansion...

  17. 28 CFR 91.3 - General eligibility requirements.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... construct, develop, expand, operate or improve correctional facilities to ensure that secure space is..., development, expansion, modification, operation or improvement of correctional facilities designed to ensure... of the multi-state compact agreement that specifies the construction, development, expansion...

  18. 28 CFR 91.3 - General eligibility requirements.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... construct, develop, expand, operate or improve correctional facilities to ensure that secure space is..., development, expansion, modification, operation or improvement of correctional facilities designed to ensure... of the multi-state compact agreement that specifies the construction, development, expansion...

  19. Initial Design and Construction of a Mobil Regenerative Fuel Cell System

    NASA Technical Reports Server (NTRS)

    Colozza, Anthony J.; Maloney, Thomas; Hoberecht, Mark (Technical Monitor)

    2003-01-01

    The design and initial construction of a mobile regenerative power system is described. The main components of the power system consists of a photovoltaic array, regenerative fuel cell and electrolyzer. The system is mounted on a modified landscape trailer and is completely self contained. An operational analysis is also presented that shows predicted performance for the system at various times of the year. The operational analysis consists of performing an energy balance on the system based on array output and total desired operational time.

  20. Small Scale Irrigation Systems: A Training Manual. Planning--Construction--Operation and Maintenance of Small Scale Irrigation Systems. A Two-Week In-Service Training Program for Peace Corps Volunteers. Training for Development. Peace Corps Information Collection & Exchange Training Manual No. T-13.

    ERIC Educational Resources Information Center

    Development Planning and Research Associates, Inc., Manhattan, KS.

    This manual provides materials for a two-week inservice training program for Peace Corps volunteers on the planning, construction, and operation and maintenance of small-scale irrigation systems. The workshop is designed to be given by two experienced professionals: one with practical knowledge of irrigation system design, operation, and…

  1. Nez Perce Tribal Hatchery Project : Combined-Planning & Design and Operations & Maintenance Reports, 2000 Annual Report.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Larson, Roy Edward; Walker, Grant W.

    2002-12-31

    Nez Perce Tribal Hatchery (NPTH) Year-2000 Combined Maintenance and Operations (O&M) and Planning and Design (P&D) contract is hereby completed based on this annual report patterned after the Statement of Work (SOW) for the project as contracted with Bonneville Power Administration. Primary project activities focused on completion of the Northwest Power Planning Council Step-3 process that: (1) Accepted final design, (2) Authorized a capital construction amount of $16,050,000, and (3) Authorized contractor selection, and (4) Provided construction site dedication, and (5) Implemented construction activities over an anticipated 2-year period of July 2000 through October 2002.

  2. Construction of a high-tech operating room for image-guided surgery using VR.

    PubMed

    Suzuki, Naoki; Hattori, Asaki; Suzuki, Shigeyuki; Otake, Yoshito; Hayashibe, Mitsuhiro; Kobayashi, Susumu; Nezu, Takehiko; Sakai, Haruo; Umezawa, Yuji

    2005-01-01

    This project aimed to construct an operating room to implement high dimensional (3D, 4D) medical imaging and medical virtual reality techniques that would enable clinical tests for new surgical procedures. We designed and constructed such an operating room at Dai-san Hospital, the Jikei Univ. School of Medicine, Tokyo, Japan. The room was equipped with various facilities for image-guided, robot and tele- surgery. In this report, we describe an outline of our "high-tech operating room" and future plans.

  3. Space construction system analysis. Part 2: Platform definition

    NASA Technical Reports Server (NTRS)

    Hart, R. J.; Myers, H. L.; Abramson, R. D.; Dejong, P. N.; Donavan, R. D.; Greenberg, H. S.; Indrikis, J.; Jandrasi, J. S.; Manoff, M.; Mcbaine, C. K.

    1980-01-01

    The top level system requirements are summarized and the accompanying conceptual design for an engineering and technology verification platform (ETVP) system is presented. An encompassing statement of the system objectives which drive the system requirements is presented and the major mission and subsystem requirements are described with emphasis on the advanced communications technology mission payload. The platform design is defined and used as a reference configuration for an end to space construction analyses. The preferred construction methods and processes, the important interactions between the platform design and the construction system design and operation, and the technology development efforts required to support the design and space construction of the ETVP are outlined.

  4. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Fitzpatrick, Stephen W.

    This project involved a three-year program managed by BioMetics, Inc. (Waltham, MA) to demonstrate the commercial feasibility of Biofine thermochemical process technology for conversion of cellulose-containing wastes or renewable materials into levulinic acid, a versatile platform chemical. The program, commencing in October 1995, involved the design, procurement, construction and operation of a plant utilizing the Biofine process to convert 1 dry ton per day of paper sludge waste. The plant was successfully designed, constructed, and commissioned in 1997. It was operated for a period of one year on paper sludge from a variety of source paper mills to collect datamore » to verify the design for a commercial scale plant. Operational results were obtained for four different feedstock varieties. Stable, continuous operation was achieved for two of the feedstocks. Continuous operation of the plant at demonstration scale provided the opportunity for process optimization, development of operational protocols, operator training and identification of suitable materials of construction for scale up to commercial operation . Separated fiber from municipal waster was also successfully processed. The project team consisted of BioMetics Inc., Great Lakes Chemical Corporation (West Lafayette, IN), and New York State Energy Research and Development Authority (Albany, NY).« less

  5. 10 CFR Appendix N to Part 52 - Standardization of Nuclear Power Plant Designs: Combined Licenses To Construct and Operate...

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Licenses To Construct and Operate Nuclear Power Reactors of Identical Design at Multiple Sites N Appendix N... FOR NUCLEAR POWER PLANTS Pt. 52, App. N Appendix N to Part 52—Standardization of Nuclear Power Plant... that the applicant wishes to have the application considered under 10 CFR part 52, appendix N, and must...

  6. 42 CFR 136.101 - Applicability.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... OF HEALTH AND HUMAN SERVICES INDIAN HEALTH Grants for Development, Construction, and Operation of... including feasibility studies, construction, operation, provision, or maintenance of services and facilities provided to Indians and, (b) for projects for planning, training, evaluation or other activities designed...

  7. Assembling of Steel Angle Headframe of Multifunctional Purpose

    NASA Astrophysics Data System (ADS)

    Kassikhina, E. G.; Pershin, V. V.; Volkov, V. M.

    2017-10-01

    The article reviews new technical solution on equipment provision of vertical shaft utilizing steel headframe of multifunctional purpose. Practice of construction of coal and ore mines provides application of various designs for steel angle headframes which are divided into separate large assembly blocks and constructive elements during assembling operations. Design of these blocks and elements, their weight and dimensions effect the chose of the method of assembling on which economic and technological indicators, as well as duration of down-time, depend on during performance of construction operations in shaft. The technical solution on equipment provision for mine vertical shaft using headframe of multifunctional purpose will allow changing the management construction of vertical shaft. The proposed headframe combines the functions of sinking and operation that eliminates costs for assembling/dissembling of temporary headgear. The constructive design of the headgear allows application of the effective method of assembly and thus to provide improvement of the technical and economic indexes, and high calendar time rate of the shaft construction due to reduction of duration of works on equipment provision for the shaft and to refurbishment of the shaft in order to carry out horizontal mining.

  8. EOC construction update

    NASA Technical Reports Server (NTRS)

    2007-01-01

    Work on Stennis Space Center's new Emergency Operations Center is progressing on schedule, according to Robert Perkins, construction manager with Jacobs Technology. At the turn of the New Year, construction contractors had completed the pervious paving for the north and west parking lots. Part of the facility's `green' design, pervious paving allows water to pass through and be absorbed directly into the ground below, preventing erosion from runoff. Through January, workers concentrated on installing the roof, sprinkler piping and overhead cable trays for electrical and communication lines. The next step will be interior work, erecting wallboard and installing electrical equipment. Perkins said NASA seeks to earn a Silver LEED (Leadership in Energy and Environmental Design) Rating for the project's environmentally-friendly and sustainable design, construction and operation. The facility has a projected completion date of February 2009.

  9. EOC construction update

    NASA Image and Video Library

    2007-12-30

    Work on Stennis Space Center's new Emergency Operations Center is progressing on schedule, according to Robert Perkins, construction manager with Jacobs Technology. At the turn of the New Year, construction contractors had completed the pervious paving for the north and west parking lots. Part of the facility's `green' design, pervious paving allows water to pass through and be absorbed directly into the ground below, preventing erosion from runoff. Through January, workers concentrated on installing the roof, sprinkler piping and overhead cable trays for electrical and communication lines. The next step will be interior work, erecting wallboard and installing electrical equipment. Perkins said NASA seeks to earn a Silver LEED (Leadership in Energy and Environmental Design) Rating for the project's environmentally-friendly and sustainable design, construction and operation. The facility has a projected completion date of February 2009.

  10. 33 CFR 148.725 - What are the design, construction and operational criteria?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... the basis of how well they: (a) Reflect the use of best available technology in design, construction...) Maximize use of existing facilities; (i) Provide personnel trained in oil spill prevention at critical...

  11. 33 CFR 148.725 - What are the design, construction and operational criteria?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... the basis of how well they: (a) Reflect the use of best available technology in design, construction...) Maximize use of existing facilities; (i) Provide personnel trained in oil spill prevention at critical...

  12. 75 FR 34004 - State Cemetery Grants

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-16

    ... architectural design codes that apply to grant applicants, we decided to update those references in a separate.... 39.63 Architectural design standards. Subpart C--Operation and Maintenance Projects Grant... acquisition, design and planning, earth moving, landscaping, construction, and provision of initial operating...

  13. Design and Construction of Simple, Nitrogen-Laser-Pumped, Tunable Dye Lasers

    ERIC Educational Resources Information Center

    Hilborn, Robert C.

    1978-01-01

    The basic physical principles of dye lasers are discussed and used to analyze the design and operation of tunable dye lasers pumped by pulsed nitrogen lasers. Details of the design and construction of these dye lasers are presented. Some simple demonstration experiments are described. (BB)

  14. Design, Construction and Test of Cryogen-Free HTS Coil Structure

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hocker, H.; Anerella, M.; Gupta, R.

    2011-03-28

    This paper will describe design, construction and test results of a cryo-mechanical structure to study coils made with the second generation High Temperature Superconductor (HTS) for the Facility for Rare Isotope Beams (FRIB). A magnet comprised of HTS coils mounted in a vacuum vessel and conduction-cooled with Gifford-McMahon cycle cryocoolers is used to develop and refine design and construction techniques. The study of these techniques and their effect on operations provides a better understanding of the use of cryogen free magnets in future accelerator projects. A cryogen-free, superconducting HTS magnet possesses certain operational advantages over cryogenically cooled, low temperature superconductingmore » magnets.« less

  15. IT Requirements Integration in High-Rise Construction Design Projects

    NASA Astrophysics Data System (ADS)

    Levina, Anastasia; Ilin, Igor; Esedulaev, Rustam

    2018-03-01

    The paper discusses the growing role of IT support for the operation of modern high-rise buildings, due to the complexity of managing engineering systems of buildings and the requirements of consumers for the IT infrastructure. The existing regulatory framework for the development of design documentation for construction, including high-rise buildings, is analyzed, and the lack of coherence in the development of this documentation with the requirements for the creation of an automated management system and the corresponding IT infrastructure is stated. The lack of integration between these areas is the cause of delays and inefficiencies both at the design stage and at the stage of putting the building into operation. The paper proposes an approach to coordinate the requirements of the IT infrastructure of high-rise buildings and design documentation for construction. The solution to this problem is possible within the framework of the enterprise architecture concept by coordinating the requirements of the IT and technological layers at the design stage of the construction.

  16. Processes in construction of failure management expert systems from device design information

    NASA Technical Reports Server (NTRS)

    Malin, Jane T.; Lance, Nick

    1987-01-01

    This paper analyzes the tasks and problem solving methods used by an engineer in constructing a failure management expert system from design information about the device to te diagnosed. An expert test engineer developed a trouble-shooting expert system based on device design information and experience with similar devices, rather than on specific expert knowledge gained from operating the device or troubleshooting its failures. The construction of the expert system was intensively observed and analyzed. This paper characterizes the knowledge, tasks, methods, and design decisions involved in constructing this type of expert system, and makes recommendations concerning tools for aiding and automating construction of such systems.

  17. Results of Laboratory Tests of the Filtration Characteristics of Clay-Cement Concrete

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sol’skii, S. V., E-mail: solskiysv@vniig.ru; Lopatina, M. G., E-mail: LoptainaMG@vniig.ru; Legina, E. E.

    Laboratory studies of the filtration characteristics of clay-cement concrete materials for constructing filtering diaphragms of earth dams by the method of secant piles are reported. Areas for further study aimed at improving the quality of construction, increasing operational safety, and developing a standards base for the design, construction, and operation of these systems are discussed.

  18. Hospital renovation projects: phased construction requires planning at its best.

    PubMed

    Cox, J C

    1986-01-01

    Building a new hospital facility is a difficult task, but adding onto and renovating an existing structure while normal activity continues is even more difficult. Project planners, designers, contractors, and hospital managers must carefully program the joint effort of construction and hospital operation. Several factors in the construction process and potential problems for hospital operations are described to help hospital managers better anticipate difficulties before plans are finalized and construction commences.

  19. Facility design, construction, and operation

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    France has been disposing of low-level radioactive waste (LLW) at the Centre de Stockage de la Manche (CSM) since 1969 and now at the Centre de Stockage de l`Aube (CSA) since 1992. In France, several agencies and companies are involved in the development and implementation of LLW technology. The Commissariat a l`Energie Atomic (CEA), is responsible for research and development of new technologies. The Agence National pour la Gestion des Dechets Radioactifs is the agency responsible for the construction and operation of disposal facilities and for wastes acceptance for these facilities. Compagnie Generale des Matieres Nucleaires provides fuel services, includingmore » uranium enrichment, fuel fabrication, and fuel reprocessing, and is thus one generator of LLW. Societe pour les Techniques Nouvelles is an engineering company responsible for commercializing CEA waste management technology and for engineering and design support for the facilities. Numatec, Inc. is a US company representing these French companies and agencies in the US. In Task 1.1 of Numatec`s contract with Martin Marietta Energy Systems, Numatec provides details on the design, construction and operation of the LLW disposal facilities at CSM and CSA. Lessons learned from operation of CSM and incorporated into the design, construction and operating procedures at CSA are identified and discussed. The process used by the French for identification, selection, and evaluation of disposal technologies is provided. Specifically, the decisionmaking process resulting in the change in disposal facility design for the CSA versus the CSM is discussed. This report provides` all of the basic information in these areas and reflects actual experience to date.« less

  20. ENGINEERING AND CONSTRUCTING THE HALLAM NUCLEAR POWER FACILITY REACTOR STRUCTURE

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Mahlmeister, J E; Haberer, W V; Casey, D F

    1960-12-15

    The Hallam Nuclear Power Facility reactor structure, including the cavity liner, is described, and the design philosophy and special design requirements which were developed during the preliminary and final engineering phases of the project are explained. The structure was designed for 600 deg F inlet and 1000 deg F outlet operating sodium temperatures and fabricated of austenitic and ferritic stainless steels. Support for the reactor core components and adequate containment for biological safeguards were readily provided even though quite conservative design philosophy was used. The calculated operating characteristics, including heat generation, temperature distributions and stress levels for full-power operation, aremore » summarized. Ship fabrication and field installation experiences are also briefly related. Results of this project have established that the sodium graphite reactor permits practical and economical fabrication and field erection procedures; considerably higher operating design temperatures are believed possible without radical design changes. Also, larger reactor structures can be similarly constructed for higher capacity (300 to 1000 Mwe) nuclear power plants. (auth)« less

  1. National Dam Safety Program. Waterloo Dam (I.D. Number NY 709), Oswego River Basin, Seneca County, New York. Phase I Inspection Report,

    DTIC Science & Technology

    1980-09-30

    GEOTECHNICAL DATA 4 2.2 DESIGN RECORDS 4 2.3 CONSTRUCTION RECORDS 4 2.4 OPERATION RECORD 4 2.5 EVALUATION OF DATA 4 3 VISUAL INSPECTION 5 3.1 FINDINGS 5...g. Design and Construction History This dam was constructed in two stages as parts of Contracts E and G for Section I of the Cayuga and Seneca Canal...determine the final elevation of the footings at the time of construction to assure a proper foundation. 2.2 DESIGN RECORDS This dam was designed in

  2. 30 CFR 717.18 - Dams constructed of or impounding waste material.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... shall design, locate, construct, operate, maintain, modify, and abandon or remove all dams (used either... design. (ix) A permanent identification marker, at least 6 feet high that shows the dam number assigned... located on or immediately adjacent to each dam within 30 days of certification of design pursuant to this...

  3. EOS: A project to investigate the design and construction of real-time distributed Embedded Operating Systems

    NASA Technical Reports Server (NTRS)

    Campbell, R. H.; Essick, Ray B.; Johnston, Gary; Kenny, Kevin; Russo, Vince

    1987-01-01

    Project EOS is studying the problems of building adaptable real-time embedded operating systems for the scientific missions of NASA. Choices (A Class Hierarchical Open Interface for Custom Embedded Systems) is an operating system designed and built by Project EOS to address the following specific issues: the software architecture for adaptable embedded parallel operating systems, the achievement of high-performance and real-time operation, the simplification of interprocess communications, the isolation of operating system mechanisms from one another, and the separation of mechanisms from policy decisions. Choices is written in C++ and runs on a ten processor Encore Multimax. The system is intended for use in constructing specialized computer applications and research on advanced operating system features including fault tolerance and parallelism.

  4. Seasonal variability of near surface soil water and groundwater tables in Florida : phase II [summary].

    DOT National Transportation Integrated Search

    2008-01-01

    Reliable predictions of the seasonal high : groundwater table (SHGWT) at potential : construction sites are critical for roadway : designs. Maximum SHGWT levels can affect the : construction and maintenance of roads, and : the design and operation of...

  5. Liquid Rocket Booster (LRB) for the Space Transportation System (STS) systems study. Appendix G: LRB for the STS system study level 2 requirements, revision 1

    NASA Technical Reports Server (NTRS)

    1989-01-01

    Requirements are presented for shuttle system definition; performance and design characteristics; shuttle vehicle end item performance and design characteristics; ground operations complex performance and design characteristics; operability and system design and construction standards; and quality control.

  6. 10 CFR 60.32 - Conditions of construction authorization.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... GEOLOGIC REPOSITORIES Licenses Construction Authorization § 60.32 Conditions of construction authorization... changes to the features of the geologic repository and the procedures authorized. The restrictions that... setting as well as measures related to the design and construction of the geologic repository operations...

  7. Design of a Versatile, Teleoperable, Towable Lifting Machine with Robotic Capabilities for Use in Nasa's Lunar Base Operations

    NASA Technical Reports Server (NTRS)

    Harris, Elizabeth; Ogle, James; Schoppe, Dean

    1989-01-01

    The lifting machine will assist in lifting cargo off of landers sent to the Moon and in the construction of a lunar base. Three possible designs were considered for the overall configuration of the lifting machine: the variable angle crane, the tower crane, and the gantry crane. Alternate designs were developed for the major components of the lifting machine. A teleoperable, variable angle crane was chosen as its final design. The design consists of a telescoping boom mounted to a chassis that is supported by two conical wheels for towing and four outriggers for stability. Attached to the end of the boom is a seven degree of freedom robot arm for light, dexterous, lifting operations. A cable and hook suspends from the end of the boom for heavy, gross, lifting operations. Approximate structural sizes were determined for the lifter and its components. However, further analysis is needed to determine the optimum design dimensions. The design team also constructed a model of the design which demonstrates its features and operating principals.

  8. Design and optimisation of novel configurations of stormwater constructed wetlands

    NASA Astrophysics Data System (ADS)

    Kiiza, Christopher

    2017-04-01

    Constructed wetlands (CWs) are recognised as a cost-effective technology for wastewater treatment. CWs have been deployed and could be retrofitted into existing urban drainage systems to prevent surface water pollution, attenuate floods and act as sources for reusable water. However, there exist numerous criteria for design configuration and operation of CWs. The aim of the study was to examine effects of design and operational variables on performance of CWs. To achieve this, 8 novel designs of vertical flow CWs were continuously operated and monitored (weekly) for 2years. Pollutant removal efficiency in each CW unit was evaluated from physico-chemical analyses of influent and effluent water samples. Hybrid optimised multi-layer perceptron artificial neural networks (MLP ANNs) were applied to simulate treatment efficiency in the CWs. Subsequently, predictive and analytical models were developed for each design unit. Results show models have sound generalisation abilities; with various design configurations and operational variables influencing performance of CWs. Although some design configurations attained faster and higher removal efficiencies than others; all 8 CW designs produced effluents permissible for discharge into watercourses with strict regulatory standards.

  9. 10 CFR Appendix A to Part 725 - Categories of Restricted Data Available

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... centrifuge or gaseous diffusion processes. b. Design, construction, and operation of any plant, facility or..., design, criticality studies and operation of reactors, reactor systems and reactor components. d... aqueous lithium hydroxide solution in packed columns. Not included is information regarding plant design...

  10. 10 CFR Appendix A to Part 725 - Categories of Restricted Data Available

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... centrifuge or gaseous diffusion processes. b. Design, construction, and operation of any plant, facility or..., design, criticality studies and operation of reactors, reactor systems and reactor components. d... aqueous lithium hydroxide solution in packed columns. Not included is information regarding plant design...

  11. 10 CFR Appendix A to Part 725 - Categories of Restricted Data Available

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... centrifuge or gaseous diffusion processes. b. Design, construction, and operation of any plant, facility or..., design, criticality studies and operation of reactors, reactor systems and reactor components. d... aqueous lithium hydroxide solution in packed columns. Not included is information regarding plant design...

  12. 10 CFR Appendix A to Part 725 - Categories of Restricted Data Available

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... centrifuge or gaseous diffusion processes. b. Design, construction, and operation of any plant, facility or..., design, criticality studies and operation of reactors, reactor systems and reactor components. d... aqueous lithium hydroxide solution in packed columns. Not included is information regarding plant design...

  13. 14 CFR 25.677 - Trim systems.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... STANDARDS: TRANSPORT CATEGORY AIRPLANES Design and Construction Control Systems § 25.677 Trim systems. (a) Trim controls must be designed to prevent inadvertent or abrupt operation and to operate in the plane... designed to prevent creeping in flight. Trim tab controls must be irreversible unless the tab is...

  14. 14 CFR 25.677 - Trim systems.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... STANDARDS: TRANSPORT CATEGORY AIRPLANES Design and Construction Control Systems § 25.677 Trim systems. (a) Trim controls must be designed to prevent inadvertent or abrupt operation and to operate in the plane... designed to prevent creeping in flight. Trim tab controls must be irreversible unless the tab is...

  15. 14 CFR 25.677 - Trim systems.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... STANDARDS: TRANSPORT CATEGORY AIRPLANES Design and Construction Control Systems § 25.677 Trim systems. (a) Trim controls must be designed to prevent inadvertent or abrupt operation and to operate in the plane... designed to prevent creeping in flight. Trim tab controls must be irreversible unless the tab is...

  16. 14 CFR 25.677 - Trim systems.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... STANDARDS: TRANSPORT CATEGORY AIRPLANES Design and Construction Control Systems § 25.677 Trim systems. (a) Trim controls must be designed to prevent inadvertent or abrupt operation and to operate in the plane... designed to prevent creeping in flight. Trim tab controls must be irreversible unless the tab is...

  17. Waste Handeling Building Conceptual Study

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    G.W. Rowe

    2000-11-06

    The objective of the ''Waste Handling Building Conceptual Study'' is to develop proposed design requirements for the repository Waste Handling System in sufficient detail to allow the surface facility design to proceed to the License Application effort if the proposed requirements are approved by DOE. Proposed requirements were developed to further refine waste handling facility performance characteristics and design constraints with an emphasis on supporting modular construction, minimizing fuel inventory, and optimizing facility maintainability and dry handling operations. To meet this objective, this study attempts to provide an alternative design to the Site Recommendation design that is flexible, simple, reliable,more » and can be constructed in phases. The design concept will be input to the ''Modular Design/Construction and Operation Options Report'', which will address the overall program objectives and direction, including options and issues associated with transportation, the subsurface facility, and Total System Life Cycle Cost. This study (herein) is limited to the Waste Handling System and associated fuel staging system.« less

  18. Review of Well Operator Files for Hydraulically Fractured Oil and Gas Production Wells: Well Design and Construction Fact Sheet

    EPA Pesticide Factsheets

    EPA reviewed a statistically representative sample of oil and gas production wells reported by nine service companies to help understand the role of well design and construction practices preventing pathways for subsurface fluid movement.

  19. 10 CFR 2.400 - Scope of subpart.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... to construct and/or operate nuclear power reactors of identical design to be located at multiple... Procedures Applicable to Proceedings for the Issuance of Licenses To Construct and/or Operate Nuclear Power... 10 Energy 1 2010-01-01 2010-01-01 false Scope of subpart. 2.400 Section 2.400 Energy NUCLEAR...

  20. 'Commitment' secures rooftop SSD contract.

    PubMed

    Davies, John

    2010-01-01

    John Davies, operations manager of multi-disciplinary mechanical and electrical and construction contractor cfes, describes a "turnkey" project that the company is undertaking for the Yeovil District Hospital (YDH) NHS Foundation Trust, involving both the design and construction of a new sterile services department, and substantial input into the facility's subsequent operation and management.

  1. Development of a current collection loss management system for SDI homopolar power supplies

    NASA Astrophysics Data System (ADS)

    Brown, D. W.

    1991-04-01

    High speed, high power density current collection systems have been identified as an enabling technology required to construct homopolar power supplies to meet SDI missions. This work is part of a three-year effort directed towards the analysis, experimental verification, and prototype construction of a current collection system designed to operate continuously at 2 kA/sq cm, at a rubbing speed of 200 m/s, and with acceptable losses in a space environment. To date, no system has achieved these conditions simultaneously. This is the final report covering the three year period of performance on DOE contract AC03-86SF-16518. Major areas covered include design, construction and operation of a cryogenically cooled brush test rig, design and construction of a high speed brush test rig, optimization study for homopolar machines, loss analysis of the current collection system, and an application study which defines the air-core homopolar construction necessary to achieve the goal of 80 kW/kg generator power density.

  2. Technical Competencies Applied in Experimental Fluid Dynamics

    NASA Astrophysics Data System (ADS)

    Tagg, Randall

    2017-11-01

    The practical design, construction, and operation of fluid dynamics experiments require a broad range of competencies. Three types are instrumental, procedural, and design. Respective examples would be operation of a spectrum analyzer, soft-soldering or brazing flow plumbing, and design of a small wind tunnel. Some competencies, such as the selection and installation of pumping systems, are unique to fluid dynamics and fluids engineering. Others, such as the design and construction of electronic amplifiers or optical imaging systems, overlap with other fields. Thus the identification and development of learning materials and methods for instruction are part of a larger effort to identify competencies needed in active research and technical innovation.

  3. Case study of restaurant successfully designed, constructed, and operated for excellent dining acoustics

    NASA Astrophysics Data System (ADS)

    Bollard, Paul; Des Jardins, Stephen

    2005-09-01

    Prior to the construction of La Provence Restaurant in Roseville, California in 2004, the owner, Stephen Des Jardins, traveled with his cook, architect, and engineer to the Provence Region of France to study the cuisine, architecture, and acoustics of the local restaurants. This information was incorporated into the design, construction, and operation of his restaurant, with acoustical design assistance provided by the author, Paul Bollard. The result of the owner's painstaking attention to detail is a restaurant which has received very positive reviews for its architecture, quality of food, service, and acoustic ambience. This paper documents the measures included in the construction of the restaurant to ensure that the building acoustics enhance the dining experience, rather than detract from it. Photographs of acoustic treatments are included, as are reverberation time (RT60) test results and ambient noise level measurement results.

  4. Orbital construction support equipment - Manned remote work station

    NASA Technical Reports Server (NTRS)

    Nassiff, S. H.

    1978-01-01

    The Manned Remote Work Station (MRWS) is a versatile piece of orbital construction support equipment which can support in-space construction in various modes of operation. Proposed near-term Space Shuttle mission support and future large orbiting systems support, along with the various construction modes of MRWS operation, are discussed. Preliminary flight subsystems requirements and configuration design are presented. Integration of the MRWS development test article with the JSC Mockup and Integration Facility, including ground-test objectives and techniques for zero-g simulations, is also presented.

  5. Space Operations Center system analysis. Volume 3, book 2: SOC system definition report, revision A

    NASA Technical Reports Server (NTRS)

    1982-01-01

    The Space Operations Center (SOC) orbital space station program operations are described. A work breakdown structure for the general purpose support equipment, construction and transportation support, and resupply and logistics support systems is given. The basis for the design of each element is presented, and a mass estimate for each element supplied. The SOC build-up operation, construction, flight support, and satellite servicing operations are described. Detailed programmatics and cost analysis are presented.

  6. 14 CFR 152.111 - Application requirements: Airport development.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... sketch or sketches of the airport layout indicating the location for each item of work proposed, using...), providing reasonable assurance that the project will be located, designed, constructed, and operated so as... the proposed development in accordance with the design and construction standards listed in appendix B...

  7. 14 CFR 152.111 - Application requirements: Airport development.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... sketch or sketches of the airport layout indicating the location for each item of work proposed, using...), providing reasonable assurance that the project will be located, designed, constructed, and operated so as... the proposed development in accordance with the design and construction standards listed in appendix B...

  8. 14 CFR 152.111 - Application requirements: Airport development.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... sketch or sketches of the airport layout indicating the location for each item of work proposed, using...), providing reasonable assurance that the project will be located, designed, constructed, and operated so as... the proposed development in accordance with the design and construction standards listed in appendix B...

  9. 14 CFR 152.111 - Application requirements: Airport development.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... sketch or sketches of the airport layout indicating the location for each item of work proposed, using...), providing reasonable assurance that the project will be located, designed, constructed, and operated so as... the proposed development in accordance with the design and construction standards listed in appendix B...

  10. 14 CFR 152.111 - Application requirements: Airport development.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... sketch or sketches of the airport layout indicating the location for each item of work proposed, using...), providing reasonable assurance that the project will be located, designed, constructed, and operated so as... the proposed development in accordance with the design and construction standards listed in appendix B...

  11. CUORE-0 detector: design, construction and operation

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Alduino, C.; Alfonso, K.; Artusa, D. R.

    The CUORE experiment will search for neutrinoless double-beta decay of 130Te with an array of 988 TeO 2 bolometers arranged in 19 towers. CUORE-0, the first tower assembled according to the CUORE procedures, was built and commissioned at Laboratori Nazionali del Gran Sasso, and took data from March 2013 to March 2015. In this study we describe the design, construction and operation of the CUORE-0 experiment, with an emphasis on the improvements made over a predecessor experiment, Cuoricino. Finally, in particular, we demonstrate with CUORE-0 data that the design goals of CUORE are within reach.

  12. CUORE-0 detector: design, construction and operation

    DOE PAGES

    Alduino, C.; Alfonso, K.; Artusa, D. R.; ...

    2016-07-12

    The CUORE experiment will search for neutrinoless double-beta decay of 130Te with an array of 988 TeO 2 bolometers arranged in 19 towers. CUORE-0, the first tower assembled according to the CUORE procedures, was built and commissioned at Laboratori Nazionali del Gran Sasso, and took data from March 2013 to March 2015. In this study we describe the design, construction and operation of the CUORE-0 experiment, with an emphasis on the improvements made over a predecessor experiment, Cuoricino. Finally, in particular, we demonstrate with CUORE-0 data that the design goals of CUORE are within reach.

  13. Inspection qualification (IQ) and operational qualification (OQ) for a vacuum freeze-dryer--Part II: Inspection qualification.

    PubMed

    Jennings, T A; Scheer, A; Emodi, A; Puderbach, L; King, S; Norton, T

    1996-01-01

    This paper demonstrates the importance of the inspection qualification (IQ). It was shown that the facilities were adequate to house the dryer and its associated instrumentation, and that the facilities had sufficient utilities to operate the dryer. The IQ established that the design and construction of the dryer was in agreement with the proposed hardware and design specifications. It was verified that the dryer was constructed in accordance with specifications set-forth by the equipment manufacturer.

  14. Stilling basin design and operation for water quality.

    DOT National Transportation Integrated Search

    2007-04-30

    Many construction projects involve the need to pump turbid water from borrow pits or : other excavations into stilling basins or sediment bags prior to discharge. The design and : operation of these basins needs to be optimized to provide the best wa...

  15. Eddy Current Flow Measurements in the FFTF

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Nielsen, Deborah L.; Polzin, David L.; Omberg, Ronald P.

    2017-02-02

    The Fast Flux Test Facility (FFTF) is the most recent liquid metal reactor (LMR) to be designed, constructed, and operated by the U.S. Department of Energy (DOE). The 400-MWt sodium-cooled, fast-neutron flux reactor plant was designed for irradiation testing of nuclear reactor fuels and materials for liquid metal fast breeder reactors. Following shut down of the Clinch River Breeder Reactor Plant (CRBRP) project in 1983, FFTF continued to play a key role in providing a test bed for demonstrating performance of advanced fuel designs and demonstrating operation, maintenance, and safety of advanced liquid metal reactors. The FFTF Program provides valuablemore » information for potential follow-on reactor projects in the areas of plant system and component design, component fabrication, fuel design and performance, prototype testing, site construction, and reactor control and operations. This report provides HEDL-TC-1344, “ECFM Flow Measurements in the FFTF Using Phase-Sensitive Detectors”, March 1979.« less

  16. A low-power photovoltaic system with energy storage for radio communications: Description and design methodology

    NASA Technical Reports Server (NTRS)

    Chapman, C. P.; Chapman, P. D.; Lewison, A. H.

    1982-01-01

    A low power photovoltaic system was constructed with approximately 500 amp hours of battery energy storage to provide power to an emergency amateur radio communications center. The system can power the communications center for about 72 hours of continuous nonsun operation. Complete construction details and a design methodology algorithm are given with abundant engineering data and adequate theory to allow similar systems to be constructed, scaled up or down, with minimum design effort.

  17. Technology Solutions Case Study: Design Guidance for Passive Vents in New Construction, Multifamily Buildings

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    In an effort to improve indoor air quality in high-performance, new construction, multifamily buildings, dedicated sources of outdoor air are being implemented. Passive vents are being selected by some design teams over other strategies because of their lower first costs and operating costs. The U.S. Department of Energy’s Building America research team Consortium for Advanced Residential Buildings constructed eight steps, which outline the design and commissioning required for these passive vents to perform as intended.

  18. 10 CFR 52.99 - Inspection during construction.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... license may proceed at its own risk with design and procurement activities, and a licensee may proceed at its own risk with design, procurement, construction, and pre-operational activities, even though the... 10 CFR 50.10(a), whichever is later, its schedule for completing the inspections, tests, or analyses...

  19. 10 CFR 52.99 - Inspection during construction.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... license may proceed at its own risk with design and procurement activities, and a licensee may proceed at its own risk with design, procurement, construction, and pre-operational activities, even though the... 10 CFR 50.10(a), whichever is later, its schedule for completing the inspections, tests, or analyses...

  20. 10 CFR 52.99 - Inspection during construction.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... license may proceed at its own risk with design and procurement activities, and a licensee may proceed at its own risk with design, procurement, construction, and pre-operational activities, even though the... 10 CFR 50.10(a), whichever is later, its schedule for completing the inspections, tests, or analyses...

  1. A review on the sustainability of constructed wetlands for wastewater treatment: Design and operation.

    PubMed

    Wu, Haiming; Zhang, Jian; Ngo, Huu Hao; Guo, Wenshan; Hu, Zhen; Liang, Shuang; Fan, Jinlin; Liu, Hai

    2015-01-01

    Constructed wetlands (CWs) have been used as a green technology to treat various wastewaters for several decades. CWs offer a land-intensive, low-energy, and less-operational-requirements alternative to conventional treatment systems, especially for small communities and remote locations. However, the sustainable operation and successful application of these systems remains a challenge. Hence, this paper aims to provide and inspire sustainable solutions for the performance and application of CWs by giving a comprehensive review of CWs' application and the recent development on their sustainable design and operation for wastewater treatment. Firstly, a brief summary on the definition, classification and application of current CWs was presented. The design parameters and operational conditions of CWs including plant species, substrate types, water depth, hydraulic load, hydraulic retention time and feeding mode related to the sustainable operation for wastewater treatments were then discussed. Lastly, future research on improving the stability and sustainability of CWs were highlighted. Copyright © 2014 Elsevier Ltd. All rights reserved.

  2. 40 CFR 761.65 - Storage for disposal.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... storage of non-liquid PCB/ radioactive wastes must be designed to prevent the buildup of liquids if such... conditions: (i) The waste is placed in a pile designed and operated to control dispersal of the waste by wind...) A run-on control system designed, constructed, operated, and maintained such that: (1) It prevents...

  3. Operational Design: The Art of Framing the Solution

    DTIC Science & Technology

    2010-04-01

    of moral or physical strength, power, and resistance — what Clausewitz called ‘the hub of all power and movement, on which everything depends…the... physical lines of operation to create decisive points. Connecting the dots already examined leads to an operational design construct that is...are identified, they should be oriented along physical or logical lines of operation. o Defining Tasks. Once lines of operation are developed

  4. 10 CFR 60.31 - Construction authorization.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... REPOSITORIES Licenses Construction Authorization § 60.31 Construction authorization. Upon review and... in a geologic repository operations area of the design proposed without unreasonable risk to the...: (1) DOE has described the proposed geologic repository including but not limited to: (i) The geologic...

  5. Operation and Maintenance of Water Pollution Control Facilities: A WPCF White Paper.

    ERIC Educational Resources Information Center

    Hill, William R.; And Others

    1979-01-01

    Presented are the recommendations of the Water Pollution Control Federation for operation and maintenance consideration during the planning design, construction, and operation of wastewater treatment facilities. (CS)

  6. Mapping of information and identification of construction waste at project life cycle

    NASA Astrophysics Data System (ADS)

    Wibowo, Mochamad Agung; Handayani, Naniek Utami; Nurdiana, Asri; Sholeh, Moh Nur; Pamungkas, Gita Silvia

    2018-03-01

    The development of construction project towards green construction is needed in order to improve the efficiency of construction projects. One that needs to be minimized is construction waste. Construction waste is waste generated from construction project activities, both solid waste and non solid waste. More specifically, the waste happens at every phase of the project life cycle. Project life cycle are the stage of idea, design, construction, and operation/maintenance. Each phase is managed by different stakeholders. Therefore it requires special handling from the involved stakeholders. The objective of the study is to map the information and identify the waste at each phase of the project life cycle. The purpose of mapping is to figure out the process of information and product flow and with its timeline. This mapping used Value Stream Mapping (VSM). Identification of waste was done by distributing questionnaire to respondents to know the waste according to owner, consultant planner, contractor, and supervisory consultant. The result of the study is the mapping of information flow and product flow at the phases of idea, design, construction, and operation/ maintenance.

  7. Around Marshall

    NASA Image and Video Library

    1972-01-01

    This is a cutaway illustration of the Neutral Buoyancy Simulator (NBS) at the Marshall Space Flight Center (MSFC ). The MSFC NBS provided an excellent environment for testing hardware to examine how it would operate in space and for evaluating techniques for space construction and spacecraft servicing. Here, engineers, designers, and astronauts performed various tests to develop basic concepts, preliminary designs, final designs, and crew procedures. The NBS was constructed of welded steel with polyester-resin coating. The water tank was 75-feet (22.9- meters) in diameter, 40-feet (12.2-meters) deep, and held 1.32 million gallons of water. Since it opened for operation in 1968, the NBS had supported a number of successful space missions, such as the Skylab, Solar Maximum Mission Satellite, Marned Maneuvering Unit, Experimental Assembly of Structures in Extravehicular Activity/Assembly Concept for Construction of Erectable Space Structures (EASE/ACCESS), the Hubble Space Telescope, and the Space Station. The function of the MSFC NBS was moved to the larger simulator at the Johnson Space Center and is no longer operational.

  8. Environmental Assessment: Proposed Automotive/Arts and Crafts Skills Center, Hill Air Force Base, Utah

    DTIC Science & Technology

    2010-10-14

    Water regarding potential sources of t practices to ensure drinking water source protection. u ity design and operating standards would be based...center would not be constructed, and adequate facilities would not be provided. The existing facility would operate as it currently exists...would be properly handled during the construction process. Operational activities would generate the same types of waste as the existing facility

  9. Materials and construction techniques for cryogenic wind tunnel facilities for instruction/research use

    NASA Technical Reports Server (NTRS)

    Morse, S. F.; Roper, A. T.

    1975-01-01

    The results of the cryogenic wind tunnel program conducted at NASA Langley Research Center are presented to provide a starting point for the design of an instructional/research wind tunnel facility. The advantages of the cryogenic concept are discussed, and operating envelopes for a representative facility are presented to indicate the range and mode of operation. Special attention is given to the design, construction and materials problems peculiar to cryogenic wind tunnels. The control system for operation of a cryogenic tunnel is considered, and a portion of a linearized mathematical model is developed for determining the tunnel dynamic characteristics.

  10. Operator function modeling: An approach to cognitive task analysis in supervisory control systems

    NASA Technical Reports Server (NTRS)

    Mitchell, Christine M.

    1987-01-01

    In a study of models of operators in complex, automated space systems, an operator function model (OFM) methodology was extended to represent cognitive as well as manual operator activities. Development continued on a software tool called OFMdraw, which facilitates construction of an OFM by permitting construction of a heterarchic network of nodes and arcs. Emphasis was placed on development of OFMspert, an expert system designed both to model human operation and to assist real human operators. The system uses a blackboard method of problem solving to make an on-line representation of operator intentions, called ACTIN (actions interpreter).

  11. An analytic-numerical method for the construction of the reference law of operation for a class of mechanical controlled systems

    NASA Astrophysics Data System (ADS)

    Mizhidon, A. D.; Mizhidon, K. A.

    2017-04-01

    An analytic-numerical method for the construction of a reference law of operation for a class of dynamic systems describing vibrations in controlled mechanical systems is proposed. By the reference law of operation of a system, we mean a law of the system motion that satisfies all the requirements for the quality and design features of the system under permanent external disturbances. As disturbances, we consider polyharmonic functions with known amplitudes and frequencies of the harmonics but unknown initial phases. For constructing the reference law of motion, an auxiliary optimal control problem is solved in which the cost function depends on a weighting coefficient. The choice of the weighting coefficient ensures the design of the reference law. Theoretical foundations of the proposed method are given.

  12. Automation of a Versatile Crane (the LSMS) for Lunar Outpost Construction, Maintenance and Inspection

    NASA Technical Reports Server (NTRS)

    Doggett, William R.; Roithmayr, Carlos M.; Dorsey, John T.; Jones, Thomas C.; Shen, Haijun; Seywald, Hans; King, Bruce D.; Mikulas, Martin M., Jr.

    2009-01-01

    Devices for lifting, translating and precisely placing payloads are critical for efficient Earth-based construction operations. Both recent and past studies have demonstrated that devices with similar functionality will be needed to support lunar outpost operations. Although several designs have been developed for Earth based applications, these devices lack unique design characteristics necessary for transport to and use on the harsh lunar surface. These design characteristics include: a) lightweight components, b) compact packaging for launch, c) automated deployment, d) simple in-field reconfiguration and repair, and e) support for tele-operated or automated operations. Also, because the cost to transport mass to the lunar surface is very high, the number of devices that can be dedicated to surface operations will be limited. Thus, in contrast to Earth-based construction, where many single-purpose devices dominate a construction site, a lunar outpost will require a limited number of versatile devices that provide operational benefit from initial construction through sustained operations. The first generation test-bed of a new high performance device, the Lunar Surface Manipulation System (LSMS) has been designed, built and field tested. The LSMS has many unique features resulting in a mass efficient solution to payload handling on the lunar surface. Typically, the LSMS device mass is estimated at approximately 3% of the mass of the heaviest payload lifted at the tip, or 1.8 % of the mass of the heaviest mass lifted at the elbow or mid-span of the boom for a high performance variant incorporating advanced structural components. Initial operational capabilities of the LSMS were successfully demonstrated during field tests at Moses Lake, Washington using a tele-operated approach. Joint angle sensors have been developed for the LSMS to improve operator situational awareness. These same sensors provide the necessary information to support fully automated operations, greatly expanding the operational versatility of the LSMS. This paper develops the equations describing the forward and inverse relation between LSMS joint angles and Cartesian coordinates of the LSMS tip. These equations allow a variety of schemes to be used to maneuver the LSMS to optimize the maneuver. One such scheme will be described in detail that eliminates undesirable swinging of the payload at the conclusion of a maneuver, even when the payload is suspended from a passive rigid link. The swinging is undesirable when performing precision maneuvers, such as aligning an object for mating or positioning a camera. Use of the equations described here enables automated control of the LSMS greatly improving its operational versatility.

  13. Space construction system analysis. Part 2: Space construction experiments concepts

    NASA Technical Reports Server (NTRS)

    Boddy, J. A.; Wiley, L. F.; Gimlich, G. W.; Greenberg, H. S.; Hart, R. J.; Lefever, A. E.; Lillenas, A. N.; Totah, R. S.

    1980-01-01

    Technology areas in the orbital assembly of large space structures are addressed. The areas included structures, remotely operated assembly techniques, and control and stabilization. Various large space structure design concepts are reviewed and their construction procedures and requirements are identified.

  14. Newman Unit 1 advanced solar repowering advanced conceptual design. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    1982-04-01

    The Newman Unit 1 solar repowering design is a water/steam central receiver concept supplying superheated steam. The work reported is to develop a refined baseline conceptual design that has potential for construction and operation by 1986, makes use of existing solar thermal technology, and provides the best economics for this application. Trade studies performed in the design effort are described, both for the conceptual design of the overall system and for the subsystem conceptual design. System-level functional requirements, design, operation, performance, cost, safety, environmental, institutional, and regulatory considerations are described. Subsystems described include the collector, receiver, fossil energy, electrical powermore » generating, and master control subsystems, site and site facilities. The conceptual design, cost, and performance of each subsystem is discussed at length. A detailed economic analysis of the repowered unit is made to realistically assess the economics of the first repowered unit using present cost data for a limited production level for solar hardware. Finally, a development plan is given, including the design, procurement, construction, checkout, startup, performance validation, and commercial operation. (LEW)« less

  15. Stilling basin design and operation for water quality : field testing, final report.

    DOT National Transportation Integrated Search

    2008-06-15

    Many construction projects involve the need to pump turbid water from borrow pits or other excavations into stilling : basins or sediment bags prior to discharge. The design and operation of these basins needs to be optimized to : provide the best wa...

  16. Operating and Maintaining the Greenhouse.

    ERIC Educational Resources Information Center

    Gresser, Priscilla A.

    This learning guide is designed to assist vocational agriculture students in mastering 20 tasks involved in the operation and maintenance of a greenhouse. Addressed in the individual sections of the guide are the following topics: identification of greenhouse designs, greenhouse construction, basic greenhouse maintenance to conserve energy,…

  17. Green Tunnel Construction Technology and Application

    NASA Astrophysics Data System (ADS)

    Zhang, J. L.; Shi, P. X.; Huang, J.; Li, H. G.; Zhou, X. Q.

    2018-05-01

    With the dramatic growth of urban tunnels in recent years, energy saving and environmental protection have received intensive attention in tunnel construction and operation. As reference to the concept of green buildings, this paper proposes the concept of green tunnels. Combining with the key issues of tunnel design, construction, operation and maintenance, the major aspects of green tunnels including prefabricated construction, noise control, ventilation & lighting energy saving, and digital intelligent maintenance are discussed and the future development of green tunnels is outlined with the economic and social benefits as indicators.

  18. An Annotated Bibliography on Operator Mental Workload Assessment

    DTIC Science & Technology

    1980-03-26

    The descriptors associated with each citation designate the general workload classification, the specific workload classification, tue type of...systems, with all of their advanced sen3ors and avionics, must be compatible with the capabilities and limitations of the aircrew. During the design ...constructs or models was included only if mental workload was at least potentially assessable from the constructs or models. C. Experimental design . A

  19. The Sampling Design of the China Family Panel Studies (CFPS)

    PubMed Central

    Xie, Yu; Lu, Ping

    2018-01-01

    The China Family Panel Studies (CFPS) is an on-going, nearly nationwide, comprehensive, longitudinal social survey that is intended to serve research needs on a large variety of social phenomena in contemporary China. In this paper, we describe the sampling design of the CFPS sample for its 2010 baseline survey and methods for constructing weights to adjust for sampling design and survey nonresponses. Specifically, the CFPS used a multi-stage probability strategy to reduce operation costs and implicit stratification to increase efficiency. Respondents were oversampled in five provinces or administrative equivalents for regional comparisons. We provide operation details for both sampling and weights construction. PMID:29854418

  20. The orbiter mate/demate device

    NASA Technical Reports Server (NTRS)

    Miller, A. J.; Binkley, W. H.

    1985-01-01

    The numerous components and systems of the space shuttle orbiter mate/demate device (MDD) are discussed. Special emphasis is given, mechanisms and mechanical systems to discuss in general their requirements, functions, and design; and, where applicable, to relate any unusual problems encountered during the initial concept studies, final design, and construction are discussed. The MDD and its electrical, machinery, and mechanical systems, including the main hoisting system, power operated access service platform, wind restrain and adjustment mechanism, etc., were successfully designed and constructed. The MDD was used routinely during the initial orbiter-747 approach and landing test and the more recent orbiter flight tests recovery and mate operations.

  1. Development of a current collection loss management system for SDI homopolar power supplies

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Brown, D.W.

    1989-01-01

    High speed, high power density current collection systems have been identified as an enabling technology required to construct homopolar power supplies to meet SDI missions. This work is part of a three-year effort directed towards the analysis, experimental verification, and prototype construction of a current collection system designed to operate continuously at 2 kA/cm{sup 2}, at a rubbing speed of 200 m/s, and with acceptable losses in a space environment. To data, no system has achieved these conditions simultaneously. This is the annual report covering the second year period of performance on DOE contract DE-AC03-86SF16518. Major areas covered include design,more » construction and operation of a cryogenically cooled brush test rig, design and construction of a high speed brush test rig, optimization study for homopolar machines, loss analysis of the current collection system, and an application study which defines the air-core homopolar construction necessary to achieve the goal of 80--90 kW/kg generator power density. 17 figs., 2 tabs.« less

  2. Development of national standards related to the integrated safety and security of high-rise buildings

    NASA Astrophysics Data System (ADS)

    Voskresenskaya, Elena; Vorona-Slivinskaya, Lubov

    2018-03-01

    The article considers the issues of developing national standards for high-rise construction. The system of standards should provide industrial, operational, economic and terrorist safety of high-rise buildings and facilities. Modern standards of high-rise construction should set the rules for designing engineering systems of high-rise buildings, which will ensure the integrated security of buildings, increase their energy efficiency and reduce the consumption of resources in construction and operation.

  3. How to renovate a 50-year-old wastewater treating plant: Part 1

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hunter, M.L.

    1996-01-01

    How does an existing refinery cost-effectively renovate wastewater/stormwater treating systems to meet today`s environmental regulations and standards? Faced with solving this problem, Amoco`s Whiting Refinery developed a project team consisting of plant and operations engineers, corporate project and design engineers, contractors and vendors to map out a strategy to re-engineer the existing wastewater treating plant (WWTP) and auxiliary functions. This case history shows how an old refinery limited by existing equipment, building space, operation`s availability requirements and costs divided the project into several design phases. The design team used a proactive approach with empowerment responsibilities to solve construction, equipment usagemore » and regulatory problems throughout the project`s lifetime. Focusing on front-end planning and customer service (the refinery), team members applied value-based engineering designs to keep costs down, implemented safe work practices during construction, used HAZOP reviews to scrutinize proposed designs for operating and maintenance procedures, etc. The result has been the renovation of a 50-year-old WWTP completed under budget, ontime and in compliance with federal mandates.« less

  4. 40 CFR 761.65 - Storage for disposal.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... conditions: (i) The waste is placed in a pile designed and operated to control dispersal of the waste by wind...) A run-on control system designed, constructed, operated, and maintained such that: (1) It prevents... 761.65 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) TOXIC SUBSTANCES CONTROL...

  5. 40 CFR 761.65 - Storage for disposal.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... conditions: (i) The waste is placed in a pile designed and operated to control dispersal of the waste by wind...) A run-on control system designed, constructed, operated, and maintained such that: (1) It prevents... 761.65 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) TOXIC SUBSTANCES CONTROL...

  6. 14 CFR 35.23 - Propeller control system.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... between operating modes, performs the functions defined by the applicant throughout the declared operating... system imbedded software must be designed and implemented by a method approved by the Administrator that... software errors. (d) The propeller control system must be designed and constructed so that the failure or...

  7. 14 CFR 35.23 - Propeller control system.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... between operating modes, performs the functions defined by the applicant throughout the declared operating... system imbedded software must be designed and implemented by a method approved by the Administrator that... software errors. (d) The propeller control system must be designed and constructed so that the failure or...

  8. 14 CFR 35.23 - Propeller control system.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... between operating modes, performs the functions defined by the applicant throughout the declared operating... system imbedded software must be designed and implemented by a method approved by the Administrator that... software errors. (d) The propeller control system must be designed and constructed so that the failure or...

  9. A strategic value management approach for energy and maintenance management in a building

    NASA Astrophysics Data System (ADS)

    Nawi, Mohd Nasrun Mohd; Dahlan, Nofri Yenita; Nadarajan, Santhirasegaran

    2015-05-01

    Fragmentation process is always been highlighted by the stakeholders in the construction industry as one of the `critical' issue that diminishing the opportunity for stakeholders that involved during the operation and maintenance stage to influence design decisions. Failure of design professionals to consider how a maintenance contractor or facility manager will construct the design thus results in higher operating cost, wastage, defects during the maintenance and operation process. Moving towards team integration is considered a significant strategy for overcoming the issue. Value Management is a style of management dedicated to guiding people and promoting innovation with the aim to improve overall building performance through structured, team-oriented exercises which make explicit, and appraise subsequent decisions, by reference to the value requirements of the clients. Accordingly, this paper discusses the fragmentation issue in more detail including the definition, causes and effects to the maintenance and operation of building and at the same time will highlighted the potential of VM integrated team approach as a strategic management approach for overcoming that issue. It also explores that the team integration strategy alleviates scheduling problems, delays and disputes during the construction process, and, hence, prevent harming the overall building performance.

  10. The space elevator: a new tool for space studies.

    PubMed

    Edwards, Bradley C

    2003-06-01

    The objective has been to develop a viable scenario for the construction, deployment and operation of a space elevator using current or near future technology. This effort has been primarily a paper study with several experimental tests of specific systems. Computer simulations, engineering designs, literature studies and inclusion of existing programs have been utilized to produce a design for the first space elevator. The results from this effort illustrate a viable design using current and near-term technology for the construction of the first space elevator. The timeline for possible construction is within the coming decades and estimated costs are less than $10 B. The initial elevator would have a 5 ton/day capacity and operating costs near $100/lb for payloads going to any Earth orbit or traveling to the Moon, Mars, Venus or the asteroids. An operational space elevator would allow for larger and much longer-term biological space studies at selectable gravity levels. The high-capacity and low operational cost of this system would also allow for inexpensive searches for life throughout our solar system and the first tests of environmental engineering. This work is supported by a grant from the NASA Institute for Advanced Concepts (NIAC).

  11. The Green Team

    EPA Pesticide Factsheets

    The environmental impacts of major development projects – office buildings, shopping malls, sports stadiums, college campuses, and the like -- don’t end with construction. From design and construction to operation and maintenance and all the way through t

  12. HANDBOOK FOR CONSTRUCTED WETLANDS RECEIVING ACID MINE DRAINAGE

    EPA Science Inventory

    In the summer of 1987, a pilot constructed wetland was built at the Big Five Tunnel in Idaho Springs, Colorado. This report details the theory, design and construction of wetlands receiving acid mine drainages, based on the second and third year of operation of this wetland, whic...

  13. SNL/CA Facilities Management Design Standards Manual

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Rabb, David; Clark, Eva

    2014-12-01

    At Sandia National Laboratories in California (SNL/CA), the design, construction, operation, and maintenance of facilities is guided by industry standards, a graded approach, and the systematic analysis of life cycle benefits received for costs incurred. The design of the physical plant must ensure that the facilities are "fit for use," and provide conditions that effectively, efficiently, and safely support current and future mission needs. In addition, SNL/CA applies sustainable design principles, using an integrated whole-building design approach, from site planning to facility design, construction, and operation to ensure building resource efficiency and the health and productivity of occupants. The safetymore » and health of the workforce and the public, any possible effects on the environment, and compliance with building codes take precedence over project issues, such as performance, cost, and schedule.« less

  14. 10 CFR 2.1115 - Designation of issues for adjudicatory hearing.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... at Civilian Nuclear Power Reactors § 2.1115 Designation of issues for adjudicatory hearing. (a) After... reactor already licensed to operate at the site, or any civilian nuclear power reactor for which a... the issuance of a construction permit or operating license for a civilian nuclear power reactor at...

  15. Processor architectures utilizing magnetic bubble and semi-conductor memories. [for the Omega navigation system

    NASA Technical Reports Server (NTRS)

    Parrish, E. A., Jr.; Aylor, J. H.

    1975-01-01

    To aid work being conducted on the feasibility of a low cost Omega navigational receiver, a control panel was designed and constructed according to supplied specifications. Since the proposed Omega receiver is designed around a microprocessor, software engineering necessary for control panel operation is included in the design. The control panel is to be used as an operational model for use in the design of a prototype receiver. A detailed description of the hardware design is presented along with a description of the software needed to operate the panel. A complete description of the operating procedures for the panel are also included.

  16. 14 CFR 29.683 - Operation tests.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 1 2010-01-01 2010-01-01 false Operation tests. 29.683 Section 29.683... STANDARDS: TRANSPORT CATEGORY ROTORCRAFT Design and Construction Control Systems § 29.683 Operation tests. It must be shown by operation tests that, when the controls are operated from the pilot compartment...

  17. 14 CFR 27.683 - Operation tests.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 14 Aeronautics and Space 1 2014-01-01 2014-01-01 false Operation tests. 27.683 Section 27.683... STANDARDS: NORMAL CATEGORY ROTORCRAFT Design and Construction Control Systems § 27.683 Operation tests. It must be shown by operation tests that, when the controls are operated from the pilot compartment with...

  18. 14 CFR 29.683 - Operation tests.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 14 Aeronautics and Space 1 2014-01-01 2014-01-01 false Operation tests. 29.683 Section 29.683... STANDARDS: TRANSPORT CATEGORY ROTORCRAFT Design and Construction Control Systems § 29.683 Operation tests. It must be shown by operation tests that, when the controls are operated from the pilot compartment...

  19. 14 CFR 27.683 - Operation tests.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 1 2010-01-01 2010-01-01 false Operation tests. 27.683 Section 27.683... STANDARDS: NORMAL CATEGORY ROTORCRAFT Design and Construction Control Systems § 27.683 Operation tests. It must be shown by operation tests that, when the controls are operated from the pilot compartment with...

  20. Bid opening report : Federal-aid highway construction contracts : first six months 1998

    DOT National Transportation Integrated Search

    1999-07-01

    This document presents human factors guidelines for designers, owners operators, and planners involved in the development and operation of traffic management centers. Dimensions of the work environment affecting operator and system performance are ad...

  1. Lunar and Planetary Bases, Habitats, and Colonies

    NASA Technical Reports Server (NTRS)

    2004-01-01

    This special bibliography includes the design and construction of lunar and Mars bases, habitats, and settlements; construction materials and equipment; life support systems; base operations and logistics; thermal management and power systems; and robotic systems.

  2. Full road closure for work zone operations, a cross-cutting study : reducing congestion and crashes through full road closure for maintenance and construction.

    DOT National Transportation Integrated Search

    2003-08-01

    The objective of this report is to raise awareness among designers construction engineers, and managers of the applications and benefits of full road closure during rehabilitation and construction activities. Based on interviews with project personne...

  3. 30 CFR 36.23 - Engine intake system.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 30 Mineral Resources 1 2014-07-01 2014-07-01 false Engine intake system. 36.23 Section 36.23... EQUIPMENT Construction and Design Requirements § 36.23 Engine intake system. (a) Construction. The intake... operator's compartment, to shut off the air supply to the engine. This valve shall be constructed to permit...

  4. 30 CFR 36.23 - Engine intake system.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 30 Mineral Resources 1 2012-07-01 2012-07-01 false Engine intake system. 36.23 Section 36.23... EQUIPMENT Construction and Design Requirements § 36.23 Engine intake system. (a) Construction. The intake... operator's compartment, to shut off the air supply to the engine. This valve shall be constructed to permit...

  5. Metallic Wall Hall Thrusters

    NASA Technical Reports Server (NTRS)

    Goebel, Dan Michael (Inventor); Hofer, Richard Robert (Inventor); Mikellides, Ioannis G. (Inventor)

    2016-01-01

    A Hall thruster apparatus having walls constructed from a conductive material, such as graphite, and having magnetic shielding of the walls from the ionized plasma has been demonstrated to operate with nearly the same efficiency as a conventional non-magnetically shielded design using insulators as wall components. The new design is believed to provide the potential of higher power and uniform operation over the operating life of a thruster device.

  6. Metallic Wall Hall Thrusters

    NASA Technical Reports Server (NTRS)

    Goebel, Dan Michael (Inventor); Hofer, Richard Robert (Inventor); Mikellides, Ioannis G. (Inventor)

    2018-01-01

    A Hall thruster apparatus having walls constructed from a conductive material, such as graphite, and having magnetic shielding of the walls from the ionized plasma has been demonstrated to operate with nearly the same efficiency as a conventional nonmagnetically shielded design using insulators as wall components. The new design is believed to provide the potential of higher power and uniform operation over the operating life of a thruster device.

  7. 14 CFR 29.683 - Operation tests.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... STANDARDS: TRANSPORT CATEGORY ROTORCRAFT Design and Construction Control Systems § 29.683 Operation tests. It must be shown by operation tests that, when the controls are operated from the pilot compartment with the control system loaded to correspond with loads specified for the system, the system is free...

  8. 14 CFR 27.683 - Operation tests.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... STANDARDS: NORMAL CATEGORY ROTORCRAFT Design and Construction Control Systems § 27.683 Operation tests. It must be shown by operation tests that, when the controls are operated from the pilot compartment with the control system loaded to correspond with loads specified for the system, the system is free from...

  9. Using GREENSCOPE Indicators for Sustainable Computer-Aided Process Evaluation and Design

    EPA Science Inventory

    Manufacturing sustainability can be increased by educating those who design, construct, and operate facilities, and by using appropriate tools for process evaluation and design. The U.S. Environmental Protection Agency's GREENSCOPE methodology and tool, for evaluation and design ...

  10. Elements of Green.

    ERIC Educational Resources Information Center

    Turckes, Steven; Engelbrecht, Kathie

    2002-01-01

    Discusses incorporating green design into school construction, asserting that schools can improve their impact on the environment and reduce their operating costs while educating people about the value of sustainable design. Addresses energy reduction (including daylighting), site design for low environmental impact, flexible design, indoor air…

  11. Superconducting Resonators Development for the FRIB and ReA Linacs at MSU: Recent Achievements and Future Goals

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Facco, A; Binkowski, J; Compton, C

    2012-07-01

    The superconducting driver and post-accelerator linacs of the FRIB project, the large scale radioactive beam facility under construction at MSU, require the construction of about 400 low-{beta} Quarter-wave (QWR) and Half-wave resonators (HWR) with four different optimum velocities. 1st and 2nd generation prototypes of {beta}{sub 0} = 0.041 and 0.085 QWRs and {beta}{sub 0} = 0.53 HWRs have been built and tested, and have more than fulfilled the FRIB and ReA design goals. The present cavity surface preparation at MSU allowed production of low-{beta} cavities nearly free from field emission. The first two cryostats of {beta}{sub 0} = 0.041 QWRsmore » are now in operation in the ReA3 linac. A 3rd generation design of the FRIB resonators allowed to further improve the cavity parameters, reducing the peak magnetic field in operation and increasing the possible operation gradient, with consequent reduction of the number of required resonators. The construction of the cavities for FRIB, which includes three phases for each cavity type (development, pre-production and production runs) has started. Cavity design, construction, treatment and performance will be described and discussed.« less

  12. Degrees of connectivity: Systems model for upstream risk assessment and mitigation.

    PubMed

    Gambatese, John; AlOmari, Kasim

    2016-08-01

    There is growing recognition that in order to further improve safety performance, attention needs to be given beyond the immediate working conditions and worker actions. A systems approach to construction safety enables considering: multiple project elements simultaneously; connections between different elements; and all system elements affected by safety risk. This paper describes recent and current research to conceptualize a typical building project in terms of connections between workers, activities, and design elements, and to verify and analyze impacts of the design and worker interactions on worker safety. Prior research provides the basis for a network tying the design elements, construction activities, and work crews on a typical building project together along with the extent of interaction between each of the system elements in terms of safety. In conjunction with this systems approach, the researchers propose a concept for viewing and managing construction safety through four different types of connections, or "degrees of connectivity," between the different workers, activities, and design elements in the system. The degrees of connectivity are defined as: interacting with the design element during its construction (DoC #1); interacting with the design element in its final form to attach another component to it (DoC #2) or by working in the vicinity of it (DoC #3); and indirectly interacting with the design element through another worker (DoC #4). To support and verify the presence of the concept in practice, the researchers conducted a survey of construction personnel. The survey results confirm that the four different degrees of connectivity are present and felt during construction operations, and indicate that attention should be given to all design elements, activities, and workers to which a worker is "connected". According to the survey respondents, DoC's #1 and #2 are recognized as the most widely present on construction sites. Eighty percent of the respondents believe that the design element has a moderate or greater impact on worker safety while it is being constructed. These initial research steps provide the starting point for continuing study that aims to develop and demonstrate the degrees of connectivity concept linking workers and design elements, with the goal of understanding how to design a project and work operations in order to improve safety during construction. Copyright © 2015 Elsevier Ltd. All rights reserved.

  13. Use of information technologies when designing multilayered plates and covers with filler of various types

    NASA Astrophysics Data System (ADS)

    Golova, T. A.; Magerramova, I. A.; Ivanov, S. A.

    2018-05-01

    Calculation of multilayered plates and covers does not consider anisotropic properties of a construction. Calculation comes down to uniform isotropic covers and definition of one of intense and deformation conditions of constructions. The existing techniques consider work of multilayered designs by means of various coefficients. The article describes the optimized algorithm of operations when designing multilayered plates and covers with filler of various types on the basis of the conducted researches. It is dealt with a development engineering algorithm of calculation of multi-layer constructions of walls. Software is created which allows one to carry out assessment of intense and deformation conditions of constructions of walls.

  14. Satellite Power Systems (SPS) concept definition study. Volume 5: Special emphasis studies. [rectenna and solar power satellite design studies

    NASA Technical Reports Server (NTRS)

    Hanley, G. M.

    1980-01-01

    Satellite configurations based on the Satellite Power System baseline requirements were analyzed and a preferred concept selected. A satellite construction base was defined, precursor operations incident to establishment of orbital support facilities identified, and the satellite construction sequence and procedures developed. Rectenna construction requirement were also addressed. Mass flow to orbit requirements were revised and traffic models established based on construction of 60 instead of 120 satellites. Analyses were conducted to determine satellite control, resources, manufacturing, and propellant requirements. The impact of the laser beam used for space-to-Earth power transmission upon the intervening atmosphere was examined as well as the inverse effect. The significant space environments and their effects on spacecraft components were investigated to define the design and operational limits imposed by the environments on an orbit transfer vehicle. The results show that LEO altitude 300 nmi and transfer orbit duration 6 months are preferrable.

  15. National Dam Safety Program. Highland Park Reservoir Dam (Inventory Number N.Y. 790), Genesee River Basin, Monroe County, New York. Phase I Inspection Report,

    DTIC Science & Technology

    1981-09-14

    34 rga Highland Park Reservoir Dam Vi’.sual I. .. ’. •Genesee River Basin, ’!ydrolozy. ". ". . . Scabi tyMo r e C u t.,.- Js eps’ •; ::or.ation -3 :..i :n...dam impounds a municipal water storage reservoir. g. Design and Construction History The dam was designed and built around 1875. h. Normal Operating... History : Date Constructed Around 1875 Date(s) Reconstructed N/A Designer Unknown Constructed by Unknown Owner Water Department, City of Rochester, New

  16. The ARCO 1 megawatt Photovoltaic Power Plant

    NASA Astrophysics Data System (ADS)

    Rhodes, G. W.; Reilly, M. R.

    The world's largest Photovoltaic Power Plant is in operation and meeting performance specifications on the Southern California Edison (SCE) grid near Hesperia, California. The 1 MW plant designed and constructed by The BDM Corporation, for ARCO Solar Inc., occupies a 20 acre site adjacent to the SCE Lugo substation. The entire design and construction process took 7 1/2 months and was not only on schedule but below budget. Because of its vast photovoltaic experience, BDM was chosen over several engineering firms to perform this complex job. We were provided a conceptual design from ARCO which we quickly refined and immediately initiated construction.

  17. 34 CFR 395.31 - Acquisition and occupation of Federal property.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... design for such construction, substantial alteration, or renovation includes a satisfactory site or sites for the location and operation of a vending facility by a blind vendor. In those cases where a design... facility to be operated by a blind vendor prior to the completion of the final space layout of the building...

  18. 34 CFR 395.31 - Acquisition and occupation of Federal property.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... design for such construction, substantial alteration, or renovation includes a satisfactory site or sites for the location and operation of a vending facility by a blind vendor. In those cases where a design... facility to be operated by a blind vendor prior to the completion of the final space layout of the building...

  19. 34 CFR 395.31 - Acquisition and occupation of Federal property.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... design for such construction, substantial alteration, or renovation includes a satisfactory site or sites for the location and operation of a vending facility by a blind vendor. In those cases where a design... facility to be operated by a blind vendor prior to the completion of the final space layout of the building...

  20. 34 CFR 395.31 - Acquisition and occupation of Federal property.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... design for such construction, substantial alteration, or renovation includes a satisfactory site or sites for the location and operation of a vending facility by a blind vendor. In those cases where a design... facility to be operated by a blind vendor prior to the completion of the final space layout of the building...

  1. 40 CFR 270.20 - Specific part B information requirements for land treatment facilities.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... field test that will be conducted, including: (i) The type of test (e.g., column leaching, degradation...: (1) The wastes to be land treated; (2) Design measures and operating practices necessary to maximize... treatment zone; (c) A description of how the unit is or will be designed, constructed, operated, and...

  2. 40 CFR 270.20 - Specific part B information requirements for land treatment facilities.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... field test that will be conducted, including: (i) The type of test (e.g., column leaching, degradation...: (1) The wastes to be land treated; (2) Design measures and operating practices necessary to maximize... treatment zone; (c) A description of how the unit is or will be designed, constructed, operated, and...

  3. 40 CFR 270.20 - Specific part B information requirements for land treatment facilities.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... field test that will be conducted, including: (i) The type of test (e.g., column leaching, degradation...: (1) The wastes to be land treated; (2) Design measures and operating practices necessary to maximize... treatment zone; (c) A description of how the unit is or will be designed, constructed, operated, and...

  4. 40 CFR 270.20 - Specific part B information requirements for land treatment facilities.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... field test that will be conducted, including: (i) The type of test (e.g., column leaching, degradation...: (1) The wastes to be land treated; (2) Design measures and operating practices necessary to maximize... treatment zone; (c) A description of how the unit is or will be designed, constructed, operated, and...

  5. 46 CFR 162.161-5 - Instruction manual for design, installation, operation, and maintenance.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 6 2014-10-01 2014-10-01 false Instruction manual for design, installation, operation, and maintenance. 162.161-5 Section 162.161-5 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) EQUIPMENT, CONSTRUCTION, AND MATERIALS: SPECIFICATIONS AND APPROVAL ENGINEERING EQUIPMENT Fixed Clean Agent Fire Extinguishing Systems §...

  6. Recommendations For The Safe Design, Operation And Use Of Commercial Sun Tanning Equipment

    NASA Astrophysics Data System (ADS)

    Cox, E. A.

    1982-02-01

    HSE Guidance Notes are being prepared to give recommendations to the designers, manufacturers, operators and users of commercial sun tanning equipment on the various health and safety aspects associated with the safe construction, siting and use of such equipment. Medically prescribed ultraviolet treatments are excluded from the guidance.

  7. Economic Evaluation of Building Design, Construction, Operation and Maintenance. Instructor's Manual.

    ERIC Educational Resources Information Center

    Ruegg, Rosalie T.; Marshall, Harold E.

    This instructor's manual describes each section of a 3-day technical seminar on how to measure the economic impact of alternative designs, systems, and operation and maintenance strategies in federal buildings. The manual was prepared to help instructors of the General Services Administration conduct technically sound and comprehensive seminars.…

  8. Chinese Biogas Digester. A Potential Model for Small-Scale, Rural Applications. (A Manual for Construction and Operation). Reprint No. R-51.

    ERIC Educational Resources Information Center

    Nakagawa, Charles H.; Honquilada, Q. L.

    This book provides the basic knowledge and guides for the construction and operation of a small-scale, family-size biogas unit. The first chapter discusses the benefits of biogas production and the Chinese biogas model. The second chapter shows the components, design formulas, and sizing units of the biogas model. Chapter 3 describes actual…

  9. The National Ignition Facility: alignment from construction to shot operations

    NASA Astrophysics Data System (ADS)

    Burkhart, S. C.; Bliss, E.; Di Nicola, P.; Kalantar, D.; Lowe-Webb, R.; McCarville, T.; Nelson, D.; Salmon, T.; Schindler, T.; Villanueva, J.; Wilhelmsen, K.

    2010-08-01

    The National Ignition Facility in Livermore, California, completed it's commissioning milestone on March 10, 2009 when it fired all 192 beams at a combined energy of 1.1 MJ at 351nm. Subsequently, a target shot series from August through December of 2009 culminated in scale ignition target design experiments up to 1.2 MJ in the National Ignition Campaign. Preparations are underway through the first half of of 2010 leading to DT ignition and gain experiments in the fall of 2010 into 2011. The top level requirement for beam pointing to target of 50μm rms is the culmination of 15 years of engineering design of a stable facility, commissioning of precision alignment, and precise shot operations controls. Key design documents which guided this project were published in the mid 1990's, driving systems designs. Precision Survey methods were used throughout construction, commissioning and operations for precision placement. Rigorous commissioning processes were used to ensure and validate placement and alignment throughout commissioning and in present day operations. Accurate and rapid system alignment during operations is accomplished by an impressive controls system to align and validate alignment readiness, assuring machine safety and productive experiments.

  10. Equipment for testing automotive lead/acid batteries under SAE J240a conditions

    NASA Astrophysics Data System (ADS)

    Hamilton, J. A.; Rand, D. A. J.

    Battery cycling equipment has been designed and constructed to test lead/acid batteries according to the American Society of Automotive Engineers' (SAE) J240a Standard. This life test simulates automotive service where the battery operates in a voltage-regulated charging system. The CSIRO design uses a master/slave concept to reduce both construction time and cost.

  11. Conoco's new approach to drill site construction in difficult, remote, swamp and jungle terrain Irian Jaya, Indonesia

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Roodriguez, F.H.

    1984-02-01

    In October 1982, Conoco Irian Jaya as operator: and partners: Pertamina, Inpex Bintuni Limited, and Moeco Irian Jaya Company, mobilized construction equipment from Singapore to the KBS ''A'' contract area in Irian Jaya, Indonesia for the purpose of constructing a base camp and drill three exploratory sites. What made this construction effort different from others previously used in Irian Jaya; was that it incorporated several new and unique features, namely: a turnkey approach to construction; that is Conoco providing complete set of specifications and conditions with contractor assuming risks for a lump sum payment; special equipment designed by contractor formore » Irian Jaya operations; an incentive to co pensate or penalize contractor for helicopter hours flown below or above a predetermined number; structural steel pile platform designs for two swamp locations (Ayot and Aum), as opposed to the more conventional corduroy timber log-plank arrangement; and drilling rig pads designed for specific heli-rig with limited extra space. All work was successfully completed within the time frame stipulated in the contract, that is five months from the time the contractor was notified to begin mobilization of equipment, materials and personnel.« less

  12. Defense Base Realignment and Closure Budget Data for Naval Air Technical Training Center, Naval Air Station Pensacola, Florida

    DTIC Science & Technology

    1994-06-07

    023- S -94 Military Construction Projects Budgeted January 14, 1994 and Programmed for Bases Identified for Closure or Realignment 028-C-93...deferred to this analysis as the more accurate basis for design and construction costs, rather than the gross estimates in the 1391’ s submitted much...solutions( s ), it is imperative that design and construction costs, operation/maintenance costs, the specific health care needs of the population to

  13. 14 CFR 25.683 - Operation tests.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 14 Aeronautics and Space 1 2013-01-01 2013-01-01 false Operation tests. 25.683 Section 25.683... STANDARDS: TRANSPORT CATEGORY AIRPLANES Design and Construction Control Systems § 25.683 Operation tests. It must be shown by operation tests that when portions of the control system subject to pilot effort loads...

  14. 14 CFR 25.683 - Operation tests.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... STANDARDS: TRANSPORT CATEGORY AIRPLANES Design and Construction Control Systems § 25.683 Operation tests. It must be shown by operation tests that when portions of the control system subject to pilot effort loads... control system are loaded to the maximum load expected in normal operation, the system is free from— (a...

  15. 14 CFR 27.695 - Power boost and power-operated control system.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... TRANSPORTATION AIRCRAFT AIRWORTHINESS STANDARDS: NORMAL CATEGORY ROTORCRAFT Design and Construction Control Systems § 27.695 Power boost and power-operated control system. (a) If a power boost or power-operated... 14 Aeronautics and Space 1 2013-01-01 2013-01-01 false Power boost and power-operated control...

  16. 14 CFR 25.683 - Operation tests.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... STANDARDS: TRANSPORT CATEGORY AIRPLANES Design and Construction Control Systems § 25.683 Operation tests. It must be shown by operation tests that when portions of the control system subject to pilot effort loads... control system are loaded to the maximum load expected in normal operation, the system is free from— (a...

  17. 14 CFR 25.683 - Operation tests.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... STANDARDS: TRANSPORT CATEGORY AIRPLANES Design and Construction Control Systems § 25.683 Operation tests. It must be shown by operation tests that when portions of the control system subject to pilot effort loads... control system are loaded to the maximum load expected in normal operation, the system is free from— (a...

  18. 14 CFR 29.695 - Power boost and power-operated control system.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... TRANSPORTATION AIRCRAFT AIRWORTHINESS STANDARDS: TRANSPORT CATEGORY ROTORCRAFT Design and Construction Control Systems § 29.695 Power boost and power-operated control system. (a) If a power boost or power-operated... 14 Aeronautics and Space 1 2013-01-01 2013-01-01 false Power boost and power-operated control...

  19. 14 CFR 25.683 - Operation tests.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... STANDARDS: TRANSPORT CATEGORY AIRPLANES Design and Construction Control Systems § 25.683 Operation tests. It must be shown by operation tests that when portions of the control system subject to pilot effort loads... control system are loaded to the maximum load expected in normal operation, the system is free from— (a...

  20. Design of the Grimethorpe Experimental Facility as of March 1981: a technical report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1984-06-01

    The Experimental Pressurized Fluidized Bed Combustor, which has been built as an extension to the National Coal Board Power Station, which is adjacent to Grimethorpe Colliery, Yorkshire, England, is described in this report. The Governments of the United Kingdom, the United States of America and the Federal Republic of Germany, under the auspices of the International Energy Agency, have agreed to share equally between them the costs of building and operating the plant. Control of the project was vested in an Executive Committee consisting of one representative of each Government with all decisions requiring unanimity. The actual operation of themore » project was vested in an Operating Agent, NCB (IEA Services) Ltd., a wholly owned subsidiary of the National Coal Board. The Implementing Agreement envisages a seven year project to be executed in four stages: (1) Procurement of Design Study with accompanying tender documents. (2) Tendering for construction of the Plant; study of appraisal of tenders. (3) Construction and acceptance of the Plant. (4) Operation of the Plant. The project is now towards the end of Stage 3. Construction has been completed and commissioning is in progress to prepare the plant for the start of the operational phase in Autumn 1981. Because of the confidentiality of much of the design information, for the purposes of this report technical descriptions have been confined to that of a general appraisal.« less

  1. Drivers of Change in Construction Training: How Significant Is the Sustainability Agenda?

    ERIC Educational Resources Information Center

    Fien, John; Winfree, Tomi

    2014-01-01

    The construction industry is contributing to the sustainability agenda through numerous strategies to improve energy efficiency in the design, materials, and operating conditions of buildings. However, this is only one driver of change in the construction sector. This article, which takes Australia as a case study, shows that many other drivers…

  2. Summary of NASA Lewis Research Center solar heating and cooling and wind energy programs

    NASA Technical Reports Server (NTRS)

    Vernon, R. W.

    1975-01-01

    Plans for the construction and operation of a solar heating and cooling system in conjunction with a office building being constructed at Langley Research Center, are discussed. Supporting research and technology includes: testing of solar collectors with a solar simulator, outdoor testing of collectors, property measurements of selective and nonselective coatings for solar collectors, and a solar model-systems test loop. The areas of a wind energy program that are being conducted include: design and operation of a 100-kW experimental wind generator, industry-designed and user-operated wind generators in the range of 50 to 3000 kW, and supporting research and technology for large wind energy systems. An overview of these activities is provided.

  3. Design of an autonomous Lunar construction utility vehicle

    NASA Technical Reports Server (NTRS)

    Ash, Robert L.; Chew, Mason; Dixon, Iain (Editor)

    1990-01-01

    In order to prepare a site for a manned lunar base, an autonomously operated construction vehicle is necessary. A Lunar Construction Utility Vehicle (LCUV), which utilizes interchangeable construction implements, was designed conceptually. Some elements of the machine were studied in greater detail. Design of an elastic loop track system has advanced to the testing stage. A standard coupling device was designed to insure a proper connection between the different construction tools and the LCUV. Autonomous control of the track drive motors was simulated successfully through the use of a joystick and computer interface. A study of hydrogen-oxygen fuel cells has produced estimates of reactant and product size requirements and identified multi-layer insulation techniques. Research on a 100 kW heat rejection system has determined that it is necessary to house a radiator panel on a utility trailer. The impact of a 720 hr use cycle has produced a very large logistical support lien which requires further study.

  4. Impact of senior design project for the development of leadership and management skills in construction management

    NASA Astrophysics Data System (ADS)

    Chowdhury, Tamara

    2013-08-01

    Senior design courses are a core part of curricula across engineering and technology disciplines. Such courses offer Construction Management (CMG) students the opportunity to bring together, assimilate and apply the knowledge they have acquired over their entire undergraduate academic programme to an applied technical project. Senior or Capstone design course engages students in a real-world project, enhance leadership development, and prepare to manage and lead project teams. The CMG programme's multidisciplinary approach at Alabama A&M University, combines essential components of construction techniques with concepts of business management to develop technically qualified individuals for responsible management roles in the design, construction and operation of major construction projects. This paper analyses the performance of the students and improvement due to the interaction with the faculty advisors and industrial panel during the two semester Capstone project. The results of this Capstone sequence have shown a continuous improvement of student performance.

  5. Work zone operations best practices guidebook

    DOT National Transportation Integrated Search

    2000-04-01

    This guidebook is the first release of a resource designed to give state and local transportation agencies, construction contractors, transportation planners, trainers, and others with interest in work zone operations access to information and points...

  6. A battery-operated pilot balloon time-signal generator

    Treesearch

    Ralph H. Moltzau

    1966-01-01

    Describes the design and construction of a 1-pound, battery-operated, time-signal transmitter, which is usable with portable radio or field telephone circuits for synchronizing multi-theodolite observation of pilot balloons.

  7. 40 CFR 265.253 - Containment.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... discharge from at least a 25-year storm; (3) The owner or operator must design, construct, operate, and...-hour, 25-year storm; and (4) Collection and holding facilities (e.g., tanks or basins) associated with...

  8. 40 CFR 265.253 - Containment.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... discharge from at least a 25-year storm; (3) The owner or operator must design, construct, operate, and...-hour, 25-year storm; and (4) Collection and holding facilities (e.g., tanks or basins) associated with...

  9. 40 CFR 265.253 - Containment.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... discharge from at least a 25-year storm; (3) The owner or operator must design, construct, operate, and...-hour, 25-year storm; and (4) Collection and holding facilities (e.g., tanks or basins) associated with...

  10. 40 CFR 265.253 - Containment.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... discharge from at least a 25-year storm; (3) The owner or operator must design, construct, operate, and...-hour, 25-year storm; and (4) Collection and holding facilities (e.g., tanks or basins) associated with...

  11. 40 CFR 265.253 - Containment.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... discharge from at least a 25-year storm; (3) The owner or operator must design, construct, operate, and...-hour, 25-year storm; and (4) Collection and holding facilities (e.g., tanks or basins) associated with...

  12. Research of Trust Chain of Operating System

    NASA Astrophysics Data System (ADS)

    Li, Hongjiao; Tian, Xiuxia

    Trust chain is one of the key technologies in designing secure operating system based on TC technology. Constructions of trust chain and trust models are analyzed. Future works in these directions are discussed.

  13. Evaluation of hot in-place recycle.

    DOT National Transportation Integrated Search

    2010-06-01

    This report documents the construction of hot in-place recycled (HIPR) pavement on SR 542. : HIPR is a process by which rehabilitation of the existing HMA pavement occurs on site in one : operation. HIPR project selection, mix design, construction an...

  14. Constructing a 4-TESLA Large Thin Solenoid at the Limit of what can BE Safely Operated

    NASA Astrophysics Data System (ADS)

    Hervé, A.

    The 4-tesla, 6 m free bore CMS solenoid has been successfully tested, operated and mapped at CERN during the autumn of 2006 in a surface hall and fully recommissioned in the underground experimental area in the autumn of 2008. The conceptual design started in 1990, the R&D studies in 1993, and the construction was approved in 1997. At the time the main parameters of this project were considered beyond what was thought possible as, in particular, the total stored magnetic energy reaches 2.6 GJ for a specific magnetic energy density exceeding 11 kJ/kg of cold mass. During this period, the international design and construction team had to make several important technical choices, particularly mechanical ones, to maximize the chances of reaching the nominal induction of 4 T. These design choices are explained and critically reviewed in the light of what is presently known to determine if better solutions would be possible today for constructing a new large high-field thin solenoid for a future detector magnet.

  15. Space construction data base

    NASA Technical Reports Server (NTRS)

    1979-01-01

    Construction of large systems in space is a technology requiring the development of construction methods to deploy, assemble, and fabricate the elements comprising such systems. A construction method is comprised of all essential functions and operations and related support equipment necessary to accomplish a specific construction task in a particular way. The data base objective is to provide to the designers of large space systems a compendium of the various space construction methods which could have application to their projects.

  16. Case study: design, operation, maintenance and water quality management of sustainable storm water ponds for roof runoff.

    PubMed

    Scholz, Miklas

    2004-12-01

    The purpose of this case study was to optimise design, operation and maintenance guidelines, and to assess the water treatment potential of a storm water pond system after 15 months of operation. The system was based on a combined silt trap, attenuation pond and vegetated infiltration basin. This combination was used as the basis for construction of a roof water runoff system from a single domestic property. United Kingdom Building Research Establishment and Construction Industry Research and Information Association, and German Association for Water, Wastewater and Waste design guidelines were tested. These design guidelines failed because they did not consider local conditions. The infiltration function for the infiltration basin was logarithmic. Algal control techniques were successfully applied, and treatment of rainwater runoff from roofs was found to be largely unnecessary for recycling (e.g., watering plants). However, seasonal and diurnal variations of biochemical oxygen demand, dissolved oxygen and pH were recorded.

  17. 40 CFR 35.905 - Definitions.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ..., architectural, legal, fiscal, or economic investigations or studies, surveys, designs, plans, working drawings... such works were designed and constructed. The term operation and maintenance includes replacement...” fittings designed for connection with those facilities. The facilities which convey waste water from...

  18. 40 CFR 35.905 - Definitions.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ..., architectural, legal, fiscal, or economic investigations or studies, surveys, designs, plans, working drawings... such works were designed and constructed. The term operation and maintenance includes replacement...” fittings designed for connection with those facilities. The facilities which convey waste water from...

  19. 40 CFR 35.905 - Definitions.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ..., architectural, legal, fiscal, or economic investigations or studies, surveys, designs, plans, working drawings... such works were designed and constructed. The term operation and maintenance includes replacement...” fittings designed for connection with those facilities. The facilities which convey waste water from...

  20. 40 CFR 35.905 - Definitions.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ..., architectural, legal, fiscal, or economic investigations or studies, surveys, designs, plans, working drawings... such works were designed and constructed. The term operation and maintenance includes replacement...” fittings designed for connection with those facilities. The facilities which convey waste water from...

  1. 40 CFR 35.905 - Definitions.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ..., architectural, legal, fiscal, or economic investigations or studies, surveys, designs, plans, working drawings... such works were designed and constructed. The term operation and maintenance includes replacement...” fittings designed for connection with those facilities. The facilities which convey waste water from...

  2. Army Corps of Engineers: Better Guidance Could Improve Corps’ Information on Water Resources Projects Undertaken by Nonfederal Sponsors

    DTIC Science & Technology

    2016-12-01

    Nonfederal Sponsors Why GAO Did This Study Through its Civil Works program, the Corps designs , constructs, and maintains federal water resources...Public Works United States Senate Dear Mr. Chairman: The U.S. Army Corps of Engineers (Corps) is the world’s largest public engineering, design ...its Civil Works Program, in general, the Corps plans, designs , constructs, operates, and maintains a wide range of water resources projects. Congress

  3. Analysis of the embodied and operational energy: Study of a suburban house in Athens, Greece

    NASA Astrophysics Data System (ADS)

    Ghiata, Maria

    Operational energy can establish how successful a building is, in terms of environmentally 'considerate' design. Though embodied energy of construction materials also comprises an important indicator of the environmental impact of the material, the construction industry does not really promote it as such. This report enhances the significance of embodied energy and its relationship to operational energy (energy in use). Since buildings are becoming less energy demanding, operational energy will be decreasing, so that embodied energy will be gaining ground in the attempt to protect the environment. By the use of an 'environmentally friendly' house as a case study, it was proven that, though changes of the wall, floor, and insulation materials can take place, the operational energy does not change. What is greatly affected is the embodied energy of these construction materials.

  4. 10 CFR 50.55a - Codes and standards.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ..., standard design approval, and standard design certification application under part 52 of this chapter is..., and components must be designed, fabricated, erected, constructed, tested, and inspected to quality... Operation and Maintenance of Nuclear Power Plants; NRC Regulatory Guide (RG) 1.84, Revision 35, “Design...

  5. 46 CFR 61.40-3 - Design verification testing.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) MARINE ENGINEERING PERIODIC TESTS AND INSPECTIONS Design Verification and Periodic Testing of Vital System Automation § 61.40-3 Design verification testing. (a) Tests must verify that automated vital systems are designed, constructed, and operate in...

  6. 4D modeling in high-rise construction

    NASA Astrophysics Data System (ADS)

    Balakina, Anastasiya; Simankina, Tatyana; Lukinov, Vitaly

    2018-03-01

    High-rise construction is a complex construction process, requiring the use of more perfected and sophisticated tools for design, planning and construction management. The use of BIM-technologies allows minimizing the risks associated with design errors and errors that occur during construction. This article discusses a visual planning method using the 4D model, which allows the project team to create an accurate and complete construction plan, which is much more difficult to achieve with the help of traditional planning methods. The use of the 4D model in the construction of a 70-story building allowed to detect spatial and temporal errors before the start of construction work. In addition to identifying design errors, 4D modeling has allowed to optimize the construction, as follows: to optimize the operation of cranes, the placement of building structures and materials at various stages of construction, to optimize the organization of work performance, as well as to monitor the activities related to the preparation of the construction site for compliance with labor protection and safety requirements, which resulted in saving money and time.

  7. Analysis and Development of a Web-Enabled Planning and Scheduling Database Application

    DTIC Science & Technology

    2013-09-01

    establishes an entity—relationship diagram for the desired process, constructs an operable database using MySQL , and provides a web- enabled interface for...development, develop, design, process, re- engineering, reengineering, MySQL , structured query language, SQL, myPHPadmin. 15. NUMBER OF PAGES 107 16...relationship diagram for the desired process, constructs an operable database using MySQL , and provides a web-enabled interface for the population of

  8. 46 CFR 61.40-3 - Design verification testing.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 2 2011-10-01 2011-10-01 false Design verification testing. 61.40-3 Section 61.40-3... INSPECTIONS Design Verification and Periodic Testing of Vital System Automation § 61.40-3 Design verification testing. (a) Tests must verify that automated vital systems are designed, constructed, and operate in...

  9. Conceptual design of a mobile remote manipulator system

    NASA Technical Reports Server (NTRS)

    Bush, H. G.; Mikulas, M. M., Jr.; Wallsom, R. E.; Jensen, J. K.

    1984-01-01

    A mobile remote manipulator system has been identified as a necessary device for space station. A conceptual design for an MRMS is presented which features (1) tracks on the MRMS and guide pins only on the truss structure, (2) a push/pull drive mechanism which rotates to permit movement in four directions, and (3) spacecrane and mobile foot restraint manipulators (or arms). Operational and design features of the MRMS elements are described and illustrated. Concepts are also presented which permit rotating the operational plane of the MRMS through 90 deg. Such a system has been found to have great utility for initial space station construction, maintenance and repair, and to provide a construction capability for future station growth or large spacecraft assembly and/or servicing.

  10. KSC-2012-6405

    NASA Image and Video Library

    2012-09-20

    CAPE CANAVERAL, Fla. -- At NASA’s Kennedy Space Center in Florida, a groundbreaking was held to mark the start of construction on the Antenna Test Bed Array for the Ka-Band Objects Observation and Monitoring, or Ka-BOOM system. Using ceremonial shovels to mark the site, from left are Michael Le, lead design engineer and construction manager Sue Vingris, Cape Design Engineer Co. project manager Kannan Rengarajan, chief executive officer of Cape Design Engineer Co. Lutfi Mized, president of Cape Design Engineer Co. David Roelandt, construction site superintendent with Cape Design Engineer Co. Marc Seibert, NASA project manager Michael Miller, NASA project manager Peter Aragona, KSC’s Electromagnetic Lab manager Stacy Hopper, KSCs master planning supervisor Dr. Bary Geldzabler, NASA chief scientist and KSC’s Chief Technologist Karen Thompson. The construction site is near the former Vertical Processing Facility, which has been demolished. Workers will begin construction on the pile foundations for the 40-foot-diameter dish antenna arrays and their associated utilities, and prepare the site for the operations command center facility. Photo credit: NASA/Charisse Nahser

  11. KSC-2012-6404

    NASA Image and Video Library

    2012-09-20

    CAPE CANAVERAL, Fla. -- At NASA’s Kennedy Space Center in Florida, a groundbreaking was held to mark the start of construction on the Antenna Test Bed Array for the Ka-Band Objects Observation and Monitoring, or Ka-BOOM system. Holding ceremonial shovels, from left are Michael Le, lead design engineer and construction manager Sue Vingris, Cape Design Engineer Co. project manager Kannan Rengarajan, chief executive officer of Cape Design Engineer Co. Lutfi Mized, president of Cape Design Engineer Co. David Roelandt, construction site superintendent with Cape Design Engineer Co. Marc Seibert, NASA project manager Michael Miller, NASA project manager Peter Aragona, KSC’s Electromagnetic Lab manager Stacy Hopper, KSCs master planning supervisor Dr. Bary Geldzabler, NASA chief scientist and KSC’s Chief Technologist Karen Thompson. The construction site is near the former Vertical Processing Facility, which has been demolished. Workers will begin construction on the pile foundations for the 40-foot-diameter dish antenna arrays and their associated utilities, and prepare the site for the operations command center facility. Photo credit: NASA/Charisse Nahser

  12. Engineering Guide for Fire Protection and Detection Systems at Army Ammunition Plants. Volume 1. Selection and Design

    DTIC Science & Technology

    1980-12-01

    type of personnel likely to he using them, (3) the physical environment , (4) health and operational safety considerations. Carefully selected portable...operated apparatus must have the battery and energy-limiting components located outside the hazardous environment , and be so constructed that a direct...designate effect on equipment or personnel), based upon the most severe result of personnel error, procedural deficiencies, environment , design

  13. Savannah River Plant engineering, design, and construction history of ``S`` projects and other work, January 1961--December 1964. Volume 2

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1970-03-01

    The work described in this volume of ``S`` Projects History is an extension of the type of work described in Volume I. E.I. du Pont de flemours & Company had entered into Contract AT (07-2)-l with the United States Atomic Energy Commission to develop, design, construct, install, and operate facilities to produce heavy water, fissionable materials, and related products. Under this contract,, Du Pont constructed and operated the Savannah River Plant. The engineering, design, and construction for most of the larger ``S`` projects was performed by the Engineering DeDartment. For some of the large and many of the smaller projectsmore » the Engineering Department was responsible only for the construction because the Atomic Energy Division (AED) of the Explosives Department handled the other phases. The Engineering Department Costruction Division also performed the physical work for many of the plant work orders. This volume includes a general description of the Du Pont Engineering Department activities pertaining to the engineering, design, and construction of the ``S`` projects at the Savannah River Plant; brief summaries of the projects and principal work requests; and supplementary informaticn on a few subjects in Volume I for which final data was not available at the closing date. Projects and other plant engineering work which were handled entirely by the Explosives Department -- AED are not included in this history.« less

  14. NREL: News - New Design Tool Analyzes Cost of Operating a Building Over its

    Science.gov Websites

    Lifetime Analyzes Cost of Operating a Building Over its Lifetime Golden, Colo., August 2, 2002 taking into consideration such factors as the initial cost of construction, mortgage payments, annual supply their own cost estimates. "Energy-10 allows the user to play 'what if' games while designing

  15. Engaging Inner City Students in Learning through Designing Remote Operated Vehicles

    ERIC Educational Resources Information Center

    Barnett, Michael

    2005-01-01

    For the past year we have been developing and implementing a program in which students design and construct remote operated vehicles. In this paper, we report on a pilot study that occurred over the course of an academic year in an inner city high school. Specifically, we have been investigating whether students learn meaningful science content…

  16. Single- versus Double-Scoring of Trend Responses in Trend Score Equating with Constructed-Response Tests. Research Report. ETS RR-10-12

    ERIC Educational Resources Information Center

    Tan, Xuan; Ricker, Kathryn L.; Puhan, Gautam

    2010-01-01

    This study examines the differences in equating outcomes between two trend score equating designs resulting from two different scoring strategies for trend scoring when operational constructed-response (CR) items are double-scored--the single group (SG) design, where each trend CR item is double-scored, and the nonequivalent groups with anchor…

  17. A shut-off valve for flexible tubing

    NASA Technical Reports Server (NTRS)

    Reyburn, W. W.

    1972-01-01

    Design of light weight valve for flexible tubing is described. Valve is hand operated and provides positive sealing in normally closed position. Diagram is provided to show construction of valve. Principles of operation are explained.

  18. A method to combine hydrodynamics and constructive design in the optimization of the runner blades of Kaplan turbines

    NASA Astrophysics Data System (ADS)

    Miclosina, C. O.; Balint, D. I.; Campian, C. V.; Frunzaverde, D.; Ion, I.

    2012-11-01

    This paper deals with the optimization of the axial hydraulic turbines of Kaplan type. The optimization of the runner blade is presented systematically from two points of view: hydrodynamic and constructive. Combining these aspects in order to gain a safer operation when unsteady effects occur in the runner of the turbine is attempted. The design and optimization of the runner blade is performed with QTurbo3D software developed at the Center for Research in Hydraulics, Automation and Thermal Processes (CCHAPT) from "Eftimie Murgu" University of Resita, Romania. QTurbo3D software offers possibilities to design the meridian channel of hydraulic turbines design the blades and optimize the runner blade. 3D modeling and motion analysis of the runner blade operating mechanism are accomplished using SolidWorks software. The purpose of motion study is to obtain forces, torques or stresses in the runner blade operating mechanism, necessary to estimate its lifetime. This paper clearly states the importance of combining the hydrodynamics with the structural design in the optimization procedure of the runner of hydraulic turbines.

  19. Technical and design update in the AUBE French low-level radioactive waste disposal facility

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Marque, Y.

    1989-01-01

    Long-term industrial management of radioactive waste in France is carried out by the Agence Nationale pour la Gestion des Dechets Radioactifs (ANDRA). ANDRA is in charge of design, siting, construction, and operation of disposal centers. The solution selected in France for the disposal of low- and medium-level, short-lived radioactive waste is near-surface disposal in the earth using the principle of multiple barriers, in accordance with national safety rules and regulations, and based on operating experience from the Centre de Stockage de la Manche. Since the center's start-up in 1969, 400,000 m{sup 3} of waste have been disposed of. The Frenchmore » national program for waste management is proceeding with the construction of a second near-surface disposal, which is expected to be operational in 1991. It is located in the department of AUBE (from which its name derives), 100 miles southeast of Paris. The paper describes the criteria for siting and design of the AUBE disposal facility, design of the AUBE facility disposal module, and comparison with North Carolina and Pennsylvania disposal facility designs.« less

  20. Building information models for astronomy projects

    NASA Astrophysics Data System (ADS)

    Ariño, Javier; Murga, Gaizka; Campo, Ramón; Eletxigerra, Iñigo; Ampuero, Pedro

    2012-09-01

    A Building Information Model is a digital representation of physical and functional characteristics of a building. BIMs represent the geometrical characteristics of the Building, but also properties like bills of quantities, definition of COTS components, status of material in the different stages of the project, project economic data, etc. The BIM methodology, which is well established in the Architecture Engineering and Construction (AEC) domain for conventional buildings, has been brought one step forward in its application for Astronomical/Scientific facilities. In these facilities steel/concrete structures have high dynamic and seismic requirements, M&E installations are complex and there is a large amount of special equipment and mechanisms involved as a fundamental part of the facility. The detail design definition is typically implemented by different design teams in specialized design software packages. In order to allow the coordinated work of different engineering teams, the overall model, and its associated engineering database, is progressively integrated using a coordination and roaming software which can be used before starting construction phase for checking interferences, planning the construction sequence, studying maintenance operation, reporting to the project office, etc. This integrated design & construction approach will allow to efficiently plan construction sequence (4D). This is a powerful tool to study and analyze in detail alternative construction sequences and ideally coordinate the work of different construction teams. In addition engineering, construction and operational database can be linked to the virtual model (6D), what gives to the end users a invaluable tool for the lifecycle management, as all the facility information can be easily accessed, added or replaced. This paper presents the BIM methodology as implemented by IDOM with the E-ELT and ATST Enclosures as application examples.

  1. KSC-03pd0578

    NASA Image and Video Library

    2003-03-04

    KENNEDY SPACE CENTER, FLA. -- -- Lifting their shovels for the groundbreaking of the Operations Support Building II are (left to right) Bill Pickavance, Vice President & Deputy Program Manager Florida Operations, United Space Alliance; Mike Wetmore, director of Shuttle Processing; Miguel Morales, chief, Facilities Division, Spaceport Services; Mike Sumner, chief of operations, Spaceport Services; David Wolfberg, designer of the facility, with Architect and Engineers Wolfberg, Alvarez and Partners of Coral Gables; Roy Bridges, KSC director; and Don Minderman, OSB II project manager, Spaceport Services. Not shown: David Boland, David Boland Inc.(construction company). The new building will replace modular housing constructed more than 20 years ago and house NASA and contractor support staff for shuttle operations. The demolition of the modular buildings has begun and construction will immediately follow. The new structure is projected to be ready in April 2005.

  2. KSC-03PD-0578

    NASA Technical Reports Server (NTRS)

    2003-01-01

    KENNEDY SPACE CENTER, FLA. -- -- Lifting their shovels for the groundbreaking of the Operations Support Building II are (left to right) Bill Pickavance, Vice President & Deputy Program Manager Florida Operations, United Space Alliance; Mike Wetmore, director of Shuttle Processing; Miguel Morales, chief, Facilities Division, Spaceport Services; Mike Sumner, chief of operations, Spaceport Services; David Wolfberg, designer of the facility, with Architect and Engineers Wolfberg, Alvarez and Partners of Coral Gables; Roy Bridges, KSC director; and Don Minderman, OSB II project manager, Spaceport Services. Not shown: David Boland, David Boland Inc.(construction company). The new building will replace modular housing constructed more than 20 years ago and house NASA and contractor support staff for shuttle operations. The demolition of the modular buildings has begun and construction will immediately follow. The new structure is projected to be ready in April 2005.

  3. Modern energy efficient technologies of high-rise construction

    NASA Astrophysics Data System (ADS)

    Lukmanova, Inessa; Golov, Roman

    2018-03-01

    The paper analyzes modern energy-efficient technologies, both being applied, and only introduced into the application in the construction of high-rise residential buildings. All technologies are systematized by the authors as part of a unified model of "Arrows of Energy-Efficient Technologies", which imply performing energy-saving measures in the design, construction and operation of buildings.

  4. Indigenous lunar construction materials

    NASA Technical Reports Server (NTRS)

    Rogers, Wayne; Sture, Stein

    1991-01-01

    The objectives are the following: to investigate the feasibility of the use of local lunar resources for construction of a lunar base structure; to develop a material processing method and integrate the method with design and construction of a pressurized habitation structure; to estimate specifications of the support equipment necessary for material processing and construction; and to provide parameters for systems models of lunar base constructions, supply, and operations. The topics are presented in viewgraph form and include the following: comparison of various lunar structures; guidelines for material processing methods; cast lunar regolith; examples of cast basalt components; cast regolith process; processing equipment; mechanical properties of cast basalt; material properties and structural design; and future work.

  5. 23 CFR 636.208 - May I use my existing prequalification procedures with design-build contracts?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... design-build contracts? 636.208 Section 636.208 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION ENGINEERING AND TRAFFIC OPERATIONS DESIGN-BUILD CONTRACTING Selection Procedures, Award Criteria... use your existing prequalification procedures for either construction or engineering design firms as a...

  6. 33 CFR 149.120 - What are the requirements for manually operated shutoff valves?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... manually operated shutoff valves? 149.120 Section 149.120 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) DEEPWATER PORTS DEEPWATER PORTS: DESIGN, CONSTRUCTION, AND EQUIPMENT Pollution Prevention Equipment § 149.120 What are the requirements for manually operated shutoff...

  7. 14 CFR 23.683 - Operation tests.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... STANDARDS: NORMAL, UTILITY, ACROBATIC, AND COMMUTER CATEGORY AIRPLANES Design and Construction Control Systems § 23.683 Operation tests. (a) It must be shown by operation tests that, when the controls are... controls, loads not less than those corresponding to the maximum pilot effort established under § 23.405...

  8. 14 CFR 23.683 - Operation tests.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... STANDARDS: NORMAL, UTILITY, ACROBATIC, AND COMMUTER CATEGORY AIRPLANES Design and Construction Control Systems § 23.683 Operation tests. (a) It must be shown by operation tests that, when the controls are... controls, loads not less than those corresponding to the maximum pilot effort established under § 23.405...

  9. 14 CFR 23.683 - Operation tests.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... STANDARDS: NORMAL, UTILITY, ACROBATIC, AND COMMUTER CATEGORY AIRPLANES Design and Construction Control Systems § 23.683 Operation tests. (a) It must be shown by operation tests that, when the controls are... controls, loads not less than those corresponding to the maximum pilot effort established under § 23.405...

  10. 14 CFR 23.683 - Operation tests.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... STANDARDS: NORMAL, UTILITY, ACROBATIC, AND COMMUTER CATEGORY AIRPLANES Design and Construction Control Systems § 23.683 Operation tests. (a) It must be shown by operation tests that, when the controls are... controls, loads not less than those corresponding to the maximum pilot effort established under § 23.405...

  11. 14 CFR 23.683 - Operation tests.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... STANDARDS: NORMAL, UTILITY, ACROBATIC, AND COMMUTER CATEGORY AIRPLANES Design and Construction Control Systems § 23.683 Operation tests. (a) It must be shown by operation tests that, when the controls are... controls, loads not less than those corresponding to the maximum pilot effort established under § 23.405...

  12. Design of an autonomous lunar construction utility vehicle

    NASA Technical Reports Server (NTRS)

    1990-01-01

    In order to prepare a site for a lunar base, an autonomously operated construction vehicle is necessary. Discussed here is a Lunar Construction Utility Vehicle (LCUV), which uses interchangeable construction implements. Design of an elastic loop track system has advanced to the testing stage. A standard coupling device has been designed to insure a proper connection between the different construction tools and the LCUV. Autonomous control of the track drive motors was simulated successfully through the use of a joystick and a computer interface. A study of hydrogen-oxygen fuel cells produced estimates of reactant and product requirements and identified multilayer insulation needs. Research on the 100-kW heat rejection system determined that it is necessary to transport the radiator panel on a utility trailer. Extensive logistical support for the 720 hour use cycle requires further study.

  13. New conceptual design of portable bamboo bridge for emergency purposes

    NASA Astrophysics Data System (ADS)

    Musthaffa, A. A.; Nor, N. M.; Yusof, M. A.; Yuhazri, M. Y.

    2018-02-01

    Portable bridges serve as routes for troops during the military operations and the disaster relief operation. Nowadays, bamboo has been regarded as one of the alternative construction materials for building and bridge structures. This paper presents the conceptual design of the portable bridge. Several types of portable bridges and bamboo bridges are reviewed in the current work. The characteristics, capability and method of construction of each bridge are discussed. Finally, the conceptual of the portable bamboo bridge for emergency purposes is presented. The idea of producing portable bridge is proposed in the current work as it is crucial for providing route for communities affected by natural disasters.

  14. The development and manufacture of wood composite wind turbine rotors

    NASA Technical Reports Server (NTRS)

    Zuteck, M. D.

    1982-01-01

    The physical properties, operational experience, and construction methods of the wood/epoxy composite MOD 0A wind turbine blades are considered. Blades of this type have accumulated over 10,000 hours of successful operation at the Kahuku, Hawaii and Block Island, Rhode Island test sites. That body of experience is summarized and related to the structural concepts and design drivers which motivated the original design and choice of interior layout. Actual manufacturing experience and associated low first unit costs for these blades, as well as projections for high production rates, are presented. Application of these construction techniques to a wide range of other blade sizes is also considered.

  15. Swarming Robot Design, Construction and Software Implementation

    NASA Technical Reports Server (NTRS)

    Stolleis, Karl A.

    2014-01-01

    In this paper is presented an overview of the hardware design, construction overview, software design and software implementation for a small, low-cost robot to be used for swarming robot development. In addition to the work done on the robot, a full simulation of the robotic system was developed using Robot Operating System (ROS) and its associated simulation. The eventual use of the robots will be exploration of evolving behaviors via genetic algorithms and builds on the work done at the University of New Mexico Biological Computation Lab.

  16. Two Readily-Constructed Instruments for the Teaching Laboratory.

    ERIC Educational Resources Information Center

    Isaacs, Neil S.

    1983-01-01

    Reported are designs for a colorimeter (absorptiometer) and polarimeter, both of which may be constructed readily with average workshop facilities and whose performance is superior to many commercial instruments commonly used in teaching laboratories. Includes pertinent diagrams, operating instructions, and sample output. (JN)

  17. Operational Modal Analysis of the Cablestayed Footbridge

    NASA Astrophysics Data System (ADS)

    Kortiš, Ján; Daniel, Ľuboš; Farbák, Matúš; Maliar, Lukáš; Škarupa, Milan

    2017-12-01

    Modern architecture leads to design subtle bridge structures that are more sensitive to increased dynamic loading than the massive ones. This phenomenon can be especially observed on lightweight steel structures such as suspended footbridges. As a result, it is necessary to know precisely its dynamic characteristics, such as natural frequencies, natural shapes and damping of construction. This information can be used for further analysis such as damage detection, system identification, health monitoring, etc. or also for the design of new types of construction. For this purpose, classical modal analysis using trigger load or harmonic vibration exciter in combination with acceleration sensors is used in practice. However, there are many situations where it is not possible to stop the traffic or operation of the bridge. The article presents an experimental measurement of the dynamic parameters of the structure at the operating load using the operational modal analysis.

  18. Conceptual design of a multiple cable crane for planetary surface operations

    NASA Technical Reports Server (NTRS)

    Mikulas, Martin M., Jr.; Yang, Li-Farn

    1991-01-01

    A preliminary design study is presented of a mobile crane suitable for conducting remote, automated construction operations on planetary surfaces. A cursory study was made of earth based mobile cranes and the needs for major improvements were identified. Current earth based cranes have a single cable supporting the payload, and precision positioning is accomplished by the use of construction workers controlling the payload by the use of tethers. For remote, autonomous operations on planetary surfaces it will be necessary to perform the precision operations without the use of humans. To accomplish this the payload must be stabilized relative to the crane. One approach for accomplishing this is to suspend the payload on multiple cable. A 3-cable suspension system crane concept is discussed. An analysis of the natural frequency of the system is presented which verifies the legitimacy of the concept.

  19. Inefficiencies in water project design and operation in the third world: An economic perspective

    NASA Astrophysics Data System (ADS)

    Howe, Charles W.; Dixon, John A.

    1993-07-01

    Water projects in less developed countries (LDCs) frequently are poorly operated and maintained. As a result, project benefits and development impacts fall short of plans. The problems begin in the project identification, design, and construction stages: donor and host country biases lead to inappropriate projects, unsustainable technologies, and shoddy construction. Later operation and maintenance are then difficult or impossible. Causal factors include donor desire to build monuments and sell technology, provision of excessive capital to favored sectors or institutions, and an unwillingness to require a reasonable quid pro quo from the host country. Host country factors include excessive administrative centralization, lack of rewards for good operation and maintenance, and widespread corruption in forms that seriously distort allocative efficiency. Until individual actors on both sides can be motivated to pursue the long-run good of the LDC, Third World water projects will continue to have low or negative net payoffs.

  20. Development of land based radar polarimeter processor system

    NASA Technical Reports Server (NTRS)

    Kronke, C. W.; Blanchard, A. J.

    1983-01-01

    The processing subsystem of a land based radar polarimeter was designed and constructed. This subsystem is labeled the remote data acquisition and distribution system (RDADS). The radar polarimeter, an experimental remote sensor, incorporates the RDADS to control all operations of the sensor. The RDADS uses industrial standard components including an 8-bit microprocessor based single board computer, analog input/output boards, a dynamic random access memory board, and power supplis. A high-speed digital electronics board was specially designed and constructed to control range-gating for the radar. A complete system of software programs was developed to operate the RDADS. The software uses a powerful real time, multi-tasking, executive package as an operating system. The hardware and software used in the RDADS are detailed. Future system improvements are recommended.

  1. KSC-2012-1852

    NASA Image and Video Library

    2012-02-17

    Industrial Area Construction: Located 5 miles south of Launch Complex 39, construction of the main buildings -- Operations and Checkout Building, Headquarters Building, and Central Instrumentation Facility – began in 1963. In 1992, the Space Station Processing Facility was designed and constructed for the pre-launch processing of International Space Station hardware that was flown on the space shuttle. Along with other facilities, the industrial area provides spacecraft assembly and checkout, crew training, computer and instrumentation equipment, hardware preflight testing and preparations, as well as administrative offices. Poster designed by Kennedy Space Center Graphics Department/Greg Lee. Credit: NASA

  2. National Program for Inspection of Non-Federal Dams. Collins Company Upper Dam (CT 00674), Connecticut River Basin, Canton, Connecticut. Phase I Inspection Report.

    DTIC Science & Technology

    1979-07-01

    Engineering Division p 0 CAR WE H FRZIAN, NENBER Design Branch Engineering Division J SEPE FIN~EGAN, JR.,CIV ater Control Branch * Engineering Division...Operator g. Purpose of Dam h. Design and Construction History i. Normal Operational Procedures 1.3 PERTINENT DATA ........................... 4 a...Tunnel i. Spillways j. Regulating Outlets SECTION 2: ENGINEERING DATA 2.1 DESIGN .............................. 9 a. Available Data b. Design Features c

  3. Design and construction of a guarded hot plate apparatus operating down to liquid nitrogen temperature.

    PubMed

    Li, Manfeng; Zhang, Hua; Ju, Yonglin

    2012-07-01

    A double-sided guarded hot plate apparatus (GHP) is specifically designed, fabricated, and constructed for the measurement of thermal conductivities of insulation specimens operated down to liquid nitrogen temperature (-196 °C), at different controlled pressures from 0.005 Pa to 0.105 MPa. The specimens placed in this apparatus are 300 mm in diameter at various thicknesses ranging from 4 mm to 40 mm. The apparatus is different from traditional GHP in terms of structure, supporting and heating method. The details of the design and construction of the hot plate, the cold plates, the suspensions, the clampings, and the vacuum chamber of the system are presented. The measurement methods of the temperatures, the input power, the meter area, and the thickness of the specimens are given. The apparatus is calibrated with teflon plates as sample and the maximum deviation from the published data is about 6% for thermal conductivity. The uncertainties for the measurement are also discussed in this paper.

  4. Building information modelling review with potential applications in tunnel engineering of China.

    PubMed

    Zhou, Weihong; Qin, Haiyang; Qiu, Junling; Fan, Haobo; Lai, Jinxing; Wang, Ke; Wang, Lixin

    2017-08-01

    Building information modelling (BIM) can be applied to tunnel engineering to address a number of problems, including complex structure, extensive design, long construction cycle and increased security risks. To promote the development of tunnel engineering in China, this paper combines actual cases, including the Xingu mountain tunnel and the Shigu Mountain tunnel, to systematically analyse BIM applications in tunnel engineering in China. The results indicate that BIM technology in tunnel engineering is currently mainly applied during the design stage rather than during construction and operation stages. The application of BIM technology in tunnel engineering covers many problems, such as a lack of standards, incompatibility of different software, disorganized management, complex combination with GIS (Geographic Information System), low utilization rate and poor awareness. In this study, through summary of related research results and engineering cases, suggestions are introduced and an outlook for the BIM application in tunnel engineering in China is presented, which provides guidance for design optimization, construction standards and later operation maintenance.

  5. Intelligent Resource Management for Local Area Networks: Approach and Evolution

    NASA Technical Reports Server (NTRS)

    Meike, Roger

    1988-01-01

    The Data Management System network is a complex and important part of manned space platforms. Its efficient operation is vital to crew, subsystems and experiments. AI is being considered to aid in the initial design of the network and to augment the management of its operation. The Intelligent Resource Management for Local Area Networks (IRMA-LAN) project is concerned with the application of AI techniques to network configuration and management. A network simulation was constructed employing real time process scheduling for realistic loads, and utilizing the IEEE 802.4 token passing scheme. This simulation is an integral part of the construction of the IRMA-LAN system. From it, a causal model is being constructed for use in prediction and deep reasoning about the system configuration. An AI network design advisor is being added to help in the design of an efficient network. The AI portion of the system is planned to evolve into a dynamic network management aid. The approach, the integrated simulation, project evolution, and some initial results are described.

  6. Building information modelling review with potential applications in tunnel engineering of China

    PubMed Central

    Zhou, Weihong; Qin, Haiyang; Fan, Haobo; Lai, Jinxing; Wang, Ke; Wang, Lixin

    2017-01-01

    Building information modelling (BIM) can be applied to tunnel engineering to address a number of problems, including complex structure, extensive design, long construction cycle and increased security risks. To promote the development of tunnel engineering in China, this paper combines actual cases, including the Xingu mountain tunnel and the Shigu Mountain tunnel, to systematically analyse BIM applications in tunnel engineering in China. The results indicate that BIM technology in tunnel engineering is currently mainly applied during the design stage rather than during construction and operation stages. The application of BIM technology in tunnel engineering covers many problems, such as a lack of standards, incompatibility of different software, disorganized management, complex combination with GIS (Geographic Information System), low utilization rate and poor awareness. In this study, through summary of related research results and engineering cases, suggestions are introduced and an outlook for the BIM application in tunnel engineering in China is presented, which provides guidance for design optimization, construction standards and later operation maintenance. PMID:28878970

  7. Building information modelling review with potential applications in tunnel engineering of China

    NASA Astrophysics Data System (ADS)

    Zhou, Weihong; Qin, Haiyang; Qiu, Junling; Fan, Haobo; Lai, Jinxing; Wang, Ke; Wang, Lixin

    2017-08-01

    Building information modelling (BIM) can be applied to tunnel engineering to address a number of problems, including complex structure, extensive design, long construction cycle and increased security risks. To promote the development of tunnel engineering in China, this paper combines actual cases, including the Xingu mountain tunnel and the Shigu Mountain tunnel, to systematically analyse BIM applications in tunnel engineering in China. The results indicate that BIM technology in tunnel engineering is currently mainly applied during the design stage rather than during construction and operation stages. The application of BIM technology in tunnel engineering covers many problems, such as a lack of standards, incompatibility of different software, disorganized management, complex combination with GIS (Geographic Information System), low utilization rate and poor awareness. In this study, through summary of related research results and engineering cases, suggestions are introduced and an outlook for the BIM application in tunnel engineering in China is presented, which provides guidance for design optimization, construction standards and later operation maintenance.

  8. 14 CFR 29.1101 - Carburetor air preheater design.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 14 Aeronautics and Space 1 2012-01-01 2012-01-01 false Carburetor air preheater design. 29.1101... Carburetor air preheater design. Each carburetor air preheater must be designed and constructed to— (a) Ensure ventilation of the preheater when the engine is operated in cold air; (b) Allow inspection of the...

  9. 14 CFR 25.1101 - Carburetor air preheater design.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 14 Aeronautics and Space 1 2012-01-01 2012-01-01 false Carburetor air preheater design. 25.1101... Carburetor air preheater design. Each carburetor air preheater must be designed and constructed to— (a) Ensure ventilation of the preheater when the engine is operated in cold air; (b) Allow inspection of the...

  10. 14 CFR 29.1101 - Carburetor air preheater design.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 14 Aeronautics and Space 1 2011-01-01 2011-01-01 false Carburetor air preheater design. 29.1101... Carburetor air preheater design. Each carburetor air preheater must be designed and constructed to— (a) Ensure ventilation of the preheater when the engine is operated in cold air; (b) Allow inspection of the...

  11. 14 CFR 25.1101 - Carburetor air preheater design.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 14 Aeronautics and Space 1 2011-01-01 2011-01-01 false Carburetor air preheater design. 25.1101... Carburetor air preheater design. Each carburetor air preheater must be designed and constructed to— (a) Ensure ventilation of the preheater when the engine is operated in cold air; (b) Allow inspection of the...

  12. Calculation of the Strip Foundation on Solid Elastic Base, Taking into Account the Karst Collapse

    NASA Astrophysics Data System (ADS)

    Sharapov, R.; Lodigina, N.

    2017-07-01

    Karst processes greatly complicate the construction and operation of buildings and structures. Due to the karstic deformations at different times there have been several major accidents, which analysis showed that in all cases the fundamental errors committed at different stages of building development: site selection, engineering survey, design, construction or operation of the facilities. Theory analysis of beams on elastic foundation is essential in building practice. Specialist engineering facilities often have to resort to multiple designing in finding efficient forms of construction of these facilities. In work the calculation of stresses in cross-sections of the strip foundation evenly distributed load in the event of karst. A comparison of extreme stress in the event of karst and without accounting for the strip foundation as a beam on an elastic foundation.

  13. Otto Van Geet | NREL

    Science.gov Websites

    Center at NREL. Otto has been involved in the design, construction, and operation of energy efficient energy use campus and community design. Mr. Van Geet was one of the founding members of the Labs21 and assessment, passive solar building design, use of design tools, photovoltaic (PV) system design

  14. Improvement of Steam Turbine Operational Performance and Reliability with using Modern Information Technologies

    NASA Astrophysics Data System (ADS)

    Brezgin, V. I.; Brodov, Yu M.; Kultishev, A. Yu

    2017-11-01

    The report presents improvement methods review in the fields of the steam turbine units design and operation based on modern information technologies application. In accordance with the life cycle methodology support, a conceptual model of the information support system during life cycle main stages (LC) of steam turbine unit is suggested. A classifying system, which ensures the creation of sustainable information links between the engineer team (manufacture’s plant) and customer organizations (power plants), is proposed. Within report, the principle of parameterization expansion beyond the geometric constructions at the design and improvement process of steam turbine unit equipment is proposed, studied and justified. The report presents the steam turbine unit equipment design methodology based on the brand new oil-cooler design system that have been developed and implemented by authors. This design system combines the construction subsystem, which is characterized by extensive usage of family tables and templates, and computation subsystem, which includes a methodology for the thermal-hydraulic zone-by-zone oil coolers design calculations. The report presents data about the developed software for operational monitoring, assessment of equipment parameters features as well as its implementation on five power plants.

  15. 43 CFR 3130.0-5 - Definitions.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... (Pub. L. 96-514). (b) Bureau means the Bureau of Land Management. (c) Constructive operations means the...—Alaska by the Naval Petroleum Reserves Production Act of 1976 (42 U.S.C. 6501). (e) Reworking operations means all operations designed to secure, restore or improve production through some use of a hole...

  16. The trend of digital control system design for nuclear power plants in Korea

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Park, S. H.; Jung, H. Y.; Yang, C. Y.

    2006-07-01

    Currently there are 20 nuclear power plants (NPPs) in operation, and 6 more units are under construction in Korea. The control systems of those NPPs have also been developed together with the technology advancement. Control systems started with On-Off control using the relay logic, had been evolved into Solid-State logic using TTL ICs, and applied with the micro-processors since the Yonggwang NPP Units 3 and 4 which started its construction in 1989. Multiplexers are also installed at the local plant areas to collect field input and to send output signals while communicating with the controllers located in the system cabinetsmore » near the main control room in order to reduce the field wiring cables. The design of the digital control system technology for the NPPs in Korea has been optimized to maximize the operability as well as the safety through the design, construction, start-up and operation experiences. Both Shin-Kori Units 1 and 2 and Shin-Wolsong Units 1 and 2 NPP projects under construction are being progressed at the same time. Digital Plant Control Systems of these projects have adopted multi-loop controllers, redundant loop configuration, and soft control system for the radwaste system. Programmable Logic Controller (PLC) and Distributed Control System (DCS) are applied with soft control system in Shin-Kori Units 3 and 4. This paper describes the evolvement of control system at the NPPs in Korea and the experience and design improvement through the observation of the latest failure of the digital control system. In addition, design concept and its trend of the digital control system being applied to the NPP in Korea are introduced. (authors)« less

  17. Construction in space - Toward a fresh definition of the man/machine relation

    NASA Technical Reports Server (NTRS)

    Watters, H. H.; Stokes, J. W.

    1979-01-01

    The EVA (extravehicular activity) project forming part of the space construction process is reviewed. The manual EVA constuction, demonstrated by the crew of Skylab 3 by assembling a modest space structure in the form of the twin-pole sunshade, is considered, indicating that the experiment dispelled many doubts about man's ability to execute routine and contingency EVA operations. Tests demonstrating the feasibility of remote teleoperator rendezvous, station keeping, and docking operations, using hand controllers for direct input and television for feedback, are noted. Future plans for designing space construction machines are mentioned.

  18. 38 CFR 39.60 - General requirements for site selection and construction of veterans cemeteries.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... Veterans' Relief DEPARTMENT OF VETERANS AFFAIRS (CONTINUED) AID FOR THE ESTABLISHMENT, EXPANSION, AND IMPROVEMENT, OR OPERATION AND MAINTENANCE, OF VETERANS CEMETERIES Establishment, Expansion, and Improvement... design and construction criteria and shall apply to all Establishment, Expansion, and Improvement...

  19. 38 CFR 39.60 - General requirements for site selection and construction of veterans cemeteries.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... Veterans' Relief DEPARTMENT OF VETERANS AFFAIRS (CONTINUED) AID FOR THE ESTABLISHMENT, EXPANSION, AND IMPROVEMENT, OR OPERATION AND MAINTENANCE, OF VETERANS CEMETERIES Establishment, Expansion, and Improvement... design and construction criteria and shall apply to all Establishment, Expansion, and Improvement...

  20. 38 CFR 39.60 - General requirements for site selection and construction of veterans cemeteries.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Veterans' Relief DEPARTMENT OF VETERANS AFFAIRS (CONTINUED) AID FOR THE ESTABLISHMENT, EXPANSION, AND IMPROVEMENT, OR OPERATION AND MAINTENANCE, OF VETERANS CEMETERIES Establishment, Expansion, and Improvement... design and construction criteria and shall apply to all Establishment, Expansion, and Improvement...

  1. Understanding the Concepts of Proportion and Ratio Constructed by Two Grade Six Students.

    ERIC Educational Resources Information Center

    Singh, Parmjit

    2000-01-01

    Reports on a study designed to construct an understanding of two grade 6 students' proportional reasoning schemes. Finds that two mental operations, unitizing and iterating, play an important role in students' use of multiplicative thinking in proportion tasks. (Author/MM)

  2. 29 CFR 1926.957 - Construction in energized substations.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... lines. When it is necessary to deenergize equipment or lines for protection of employees, the... performed by designated employees. (2) Precaution shall be taken to prevent accidental operation of relays... removed for construction purposes, a temporary fence affording similar protection when the site is...

  3. 29 CFR 1926.957 - Construction in energized substations.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... lines. When it is necessary to deenergize equipment or lines for protection of employees, the... performed by designated employees. (2) Precaution shall be taken to prevent accidental operation of relays... removed for construction purposes, a temporary fence affording similar protection when the site is...

  4. The embedded operating system project

    NASA Technical Reports Server (NTRS)

    Campbell, R. H.

    1985-01-01

    The design and construction of embedded operating systems for real-time advanced aerospace applications was investigated. The applications require reliable operating system support that must accommodate computer networks. Problems that arise in the construction of such operating systems, reconfiguration, consistency and recovery in a distributed system, and the issues of real-time processing are reported. A thesis that provides theoretical foundations for the use of atomic actions to support fault tolerance and data consistency in real-time object-based system is included. The following items are addressed: (1) atomic actions and fault-tolerance issues; (2) operating system structure; (3) program development; (4) a reliable compiler for path Pascal; and (5) mediators, a mechanism for scheduling distributed system processes.

  5. Cost-efficiency of highway operations and maintenance of public-private partnerships.

    DOT National Transportation Integrated Search

    2014-08-01

    While the literature on public-private partnerships (PPPs) argues that the private sectors life-cycle : approach to design and construction results in operational cost efficiencies, empirical support is : missing. This study explored that issue by...

  6. Satellite Power Systems (SPS) concept definition study (Exhibit D). Volume 4: Operations analyses

    NASA Technical Reports Server (NTRS)

    Hanley, G. M.

    1981-01-01

    Using a coplanar, end-mounted antenna as a baseline, various configuration trades were performed to select a preferred solid state concept. The increase in efficiency that could be realized by use of multi bandgap solar cells, either with klystron or solid state antenna was evaluated. Satellite configurations were developed to exploit the sandwich antenna concept wherein solar cells are located on one side of the antenna panel and solid state dc/RF converters on the other side. These concepts entailed various primary and secondary reflector arrangements for directing solar energy to the solar cell side of the antenna with higher concentration ratios than used on the coplanar configurations. Operations analysis included development of a satellite construction scenario, a concept for the SCB, a top-level satellite construction operation, construction operation, construction timelines and crew sizes, mass flows to orbit, and a satellite maintenance scenario. The list of materials required for satellite construction was updated to identify significant differences relevant to the solid state satellite concept. Means of decommissioning satellites at the end of their design life were studied.

  7. A physiological exploration on operational stance and occupational musculoskeletal problem manifestations amongst construction labourers of West Bengal, India.

    PubMed

    Chatterjee, Arijit; Sahu, Subhashis

    2018-03-29

    A huge number of labourers engaged in construction industry in India both in organized and unorganized sectors. The construction labourers most often work for an extended period of time and they are compelled to uphold altered static and dynamic operational stance in awkward positions during the complete period of work which raises the demand on the musculoskeletal system and may lead to work related musculoskeletal disorders (WRMSDs). This study is intended to explore the operational stance and occupation related musculoskeletal manifestations amongst the construction labourers. One sixty four male labourers from different construction sites of West Bengal was randomly taken for this study. A modified Nordic questionnaire on MSD and the 12 item General Health Questionnaire (GHQ12) were administered on the construction labourers. Rapid Entire Body Assessment [REBA] and Ovako Work Analysis System [OWAS] methods were applied to analyze the operational stance. Finally, discomfort levels of the specific operational stance were calculated by the use of risk level and BPD scale. From the study it was revealed that most of the construction labourers habitually in awkward operational stance and were affected by altering musculoskeletal manifestations like pain in low back, neck, and wrist. It has been also found that there is a significant (p< 0.05) association between the intensity of pain feeling, age, year of working experience and risk level of the individual working postures of the labourers. Appropriate work-rest schedule, amendments of some working techniques and use of some ergonomically designed equipment may lessen the WRMSDs and improve the health eminence of construction labourers in unorganized sectors.

  8. A toolbox and a record for scientific model development

    NASA Technical Reports Server (NTRS)

    Ellman, Thomas

    1994-01-01

    Scientific computation can benefit from software tools that facilitate construction of computational models, control the application of models, and aid in revising models to handle new situations. Existing environments for scientific programming provide only limited means of handling these tasks. This paper describes a two pronged approach for handling these tasks: (1) designing a 'Model Development Toolbox' that includes a basic set of model constructing operations; and (2) designing a 'Model Development Record' that is automatically generated during model construction. The record is subsequently exploited by tools that control the application of scientific models and revise models to handle new situations. Our two pronged approach is motivated by our belief that the model development toolbox and record should be highly interdependent. In particular, a suitable model development record can be constructed only when models are developed using a well defined set of operations. We expect this research to facilitate rapid development of new scientific computational models, to help ensure appropriate use of such models and to facilitate sharing of such models among working computational scientists. We are testing this approach by extending SIGMA, and existing knowledge-based scientific software design tool.

  9. Constructing a 4-Tesla Large Thin Solenoid at the Limit of what can BE Safely Operated

    NASA Astrophysics Data System (ADS)

    Hervé, A.

    The 4-tesla, 6m free bore CMS solenoid has been successfully tested, operated and mapped at CERN during the autumn of 2006 in a surface hall and fully recommissioned in the underground experimental area in the autumn of 2008. The conceptual design started in 1990, the R&D studies in 1993, and the construction was approved in 1997. At the time the main parameters of this project were considered beyond what was thought possible as, in particular, the total stored magnetic energy reaches 2.6GJ for a specific magnetic energy density exceeding 11 kJ/kg of cold mass. During this period, the international design and construction team had to make several important technical choices, particularly mechanical ones, to maximize the chances of reaching the nominal induction of 4T. These design choices are explained and critically reviewed in the light of what is presently known to determine if better solutions would be possible today for constructing a new large high-field thin solenoid for a future detector magnet.

  10. 33 CFR 148.725 - What are the design, construction and operational criteria?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... evaluated on the basis of how well they: (a) Reflect the use of best available technology in design... prevention at critical locations identified in the accident analysis; (j) Provide personnel trained in oil...

  11. 33 CFR 148.725 - What are the design, construction and operational criteria?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... evaluated on the basis of how well they: (a) Reflect the use of best available technology in design... prevention at critical locations identified in the accident analysis; (j) Provide personnel trained in oil...

  12. US Green Building Council's Leadership in Energy and Environmental Design (LEED®)

    EPA Pesticide Factsheets

    A series of rating systems aimed at increasing the environmental and health performance of buildings' sites and structures and of neighborhoods. LEED® covers the design, construction, and operations of all types of buildings.

  13. Design, construction, and testing of a high altitude research glider

    NASA Astrophysics Data System (ADS)

    Parker, Trevor Llewellyn

    Micro aerial vehicle development and atmospheric flight on Mars are areas that require research in very low Reynolds number flight. Facilities for studying these problems are not widely available. The upper atmosphere of the Earth, approximately 100,000 feet AGL, is readily available and closely resembles the atmosphere on Mars, in both temperature and density. This low density also allows normal size test geometry with a very low Reynolds number. This solves a problem in micro aerial vehicle development; it can be very difficult to manufacture instrumented test apparatus in the small sizes required for conventional testing. This thesis documents the design, construction, and testing of a glider designed to be released from a weather balloon at 100,000 feet AGL and operate in this environment, collecting airfoil and aircraft performance data. The challenges of designing a vehicle to operate in a low Reynolds number, low temperature environment are addressed.

  14. Space station structures and dynamics test program

    NASA Technical Reports Server (NTRS)

    Moore, Carleton J.; Townsend, John S.; Ivey, Edward W.

    1987-01-01

    The design, construction, and operation of a low-Earth orbit space station poses unique challenges for development and implementation of new technology. The technology arises from the special requirement that the station be built and constructed to function in a weightless environment, where static loads are minimal and secondary to system dynamics and control problems. One specific challenge confronting NASA is the development of a dynamics test program for: (1) defining space station design requirements, and (2) identifying the characterizing phenomena affecting the station's design and development. A general definition of the space station dynamic test program, as proposed by MSFC, forms the subject of this report. The test proposal is a comprehensive structural dynamics program to be launched in support of the space station. The test program will help to define the key issues and/or problems inherent to large space structure analysis, design, and testing. Development of a parametric data base and verification of the math models and analytical analysis tools necessary for engineering support of the station's design, construction, and operation provide the impetus for the dynamics test program. The philosophy is to integrate dynamics into the design phase through extensive ground testing and analytical ground simulations of generic systems, prototype elements, and subassemblies. On-orbit testing of the station will also be used to define its capability.

  15. Hazard and operability study of the multi-function Waste Tank Facility. Revision 1

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hughes, M.E.

    1995-05-15

    The Multi-Function Waste Tank Facility (MWTF) East site will be constructed on the west side of the 200E area and the MWTF West site will be constructed in the SW quadrant of the 200W site in the Hanford Area. This is a description of facility hazards that site personnel or the general public could potentially be exposed to during operation. A list of preliminary Design Basis Accidents was developed.

  16. Evidence-Based and Value-Based Decision Making About Healthcare Design: An Economic Evaluation of the Safety and Quality Outcomes.

    PubMed

    Zadeh, Rana; Sadatsafavi, Hessam; Xue, Ryan

    2015-01-01

    This study describes a vision and framework that can facilitate the implementation of evidence-based design (EBD), scientific knowledge base into the process of the design, construction, and operation of healthcare facilities and clarify the related safety and quality outcomes for the stakeholders. The proposed framework pairs EBD with value-driven decision making and aims to improve communication among stakeholders by providing a common analytical language. Recent EBD research indicates that the design and operation of healthcare facilities contribute to an organization's operational success by improving safety, quality, and efficiency. However, because little information is available about the financial returns of evidence-based investments, such investments are readily eliminated during the capital-investment decision-making process. To model the proposed framework, we used engineering economy tools to evaluate the return on investments in six successful cases, identified by a literature review, in which facility design and operation interventions resulted in reductions in hospital-acquired infections, patient falls, staff injuries, and patient anxiety. In the evidence-based cases, calculated net present values, internal rates of return, and payback periods indicated that the long-term benefits of interventions substantially outweighed the intervention costs. This article explained a framework to develop a research-based and value-based communication language on specific interventions along the planning, design and construction, operation, and evaluation stages. Evidence-based and value-based design frameworks can be applied to communicate the life-cycle costs and savings of EBD interventions to stakeholders, thereby contributing to more informed decision makings and the optimization of healthcare infrastructures. © The Author(s) 2015.

  17. The AP1000{sup R} China projects move forward to construction completion and equipment installation

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Harrop, G.

    2012-07-01

    The AP1000 design is the only Generation III+ technology to receive design certification from the U.S. Nuclear Regulatory Commission. This evolutionary design provides the highest safety and performance standards and has several distinct advantages over other designs, including improved operations and reduced construction schedule risks through the use of modern, modular, engineering principles that allow construction and fabrication tasks traditionally performed in sequence to be undertaken in parallel. Since the first granting of Design Certification in 2005 by the NRC, the AP1000 design has been modified to meet emergent NRC requirements such as those requiring the design to withstand themore » impact of an aircraft crash. Both domestic and foreign utilities have turned to the Westinghouse AP1000 plant design to meet their near - and long-term sustainable energy needs. The first ever deployment of this advanced U.S. nuclear power technology began in China in 2007 with the award of a contract to build four AP1000 units, constructed in pairs at the coastal sites of Sanmen (Zhejiang Province) and Haiyang (Shandong Province). Currently, all four units are at an advanced stage of construction. The commercial operation date for Sanmen Unit 1 is November 2013 followed by Haiyang Unit 1 being operational in May 2014. Construction and equipment manufacture is at an advanced stage. Sanmen Unit 1 equipment that has been delivered includes the reactor vessel, the reactor vessel closure head, the passive residual heat removal heat exchanger, the integrated head package, the polar crane, and the refueling machine. The steam generators are also completed. The RV was installed within the containment vessel building in September 2011. The installation of this major equipment will allow the setting of the containment vessel top head. Haiyang Unit 1 is also achieving significant progress. Significant benefits continue to be realized as a result of lessons learned and experience gained from the first-of-a-kind activities for Sanmen Unit 1 and AP1000 equipment design and manufacturing. For example, the nuclear island basemat at Haiyang Units 1 and 2 and Sanmen Unit 2 was laid in less time than that of Sanmen Unit 1, the ultra-large steam generator and RV forging lead times were reduced for the follow on units, and the fabrication of the auxiliary building module for Haiyang Unit 1 took less time than for the Sanmen first unit. These benefits are also being realized by the United States AP1000 project construction and fabrication modules, and equipment. Some difficulties arise from building this first-of-a-kind (advanced passive) type of plant; however, these difficulties are being overcome and the overall schedule remains achievable. (authors)« less

  18. Journal of Special Operations Medicine, Volume 3, Edition 3

    DTIC Science & Technology

    2003-01-01

    focuses on the basic design, construction, uti - lization, components, and nomenclature associated with the ICS. Objectives: 1. Maximize the overall...TX 76134 9. American Society of Health-System Pharmacists : AHFS Drug Information. Bethesda, Maryland; 2002:1305 Journal of Special Operations

  19. 14 CFR 33.68 - Induction system icing.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION AIRCRAFT AIRWORTHINESS STANDARDS: AIRCRAFT ENGINES Design and Construction; Turbine Aircraft Engines § 33.68 Induction system icing. Each engine, with all icing protection systems operating, must— (a) Operate throughout its flight power...

  20. 14 CFR 33.68 - Induction system icing.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION AIRCRAFT AIRWORTHINESS STANDARDS: AIRCRAFT ENGINES Design and Construction; Turbine Aircraft Engines § 33.68 Induction system icing. Each engine, with all icing protection systems operating, must— (a) Operate throughout its flight power...

  1. UOE Pipe Manufacturing Process Simulation: Equipment Designing and Construction

    NASA Astrophysics Data System (ADS)

    Delistoian, Dmitri; Chirchor, Mihael

    2017-12-01

    UOE pipe manufacturing process influence directly on pipeline resilience and operation capacity. At present most spreaded pipe manufacturing method is UOE. This method is based on cold forming. After each technological step appears a certain stress and strain level. For pipe stress strain study is designed and constructed special equipment that simulate entire technological process.UOE pipe equipment is dedicated for manufacturing of longitudinally submerged arc welded DN 400 (16 inch) steel pipe.

  2. Center for the Built Environment: Research

    Science.gov Websites

    to design and development teams, leading to a situation in which many building industry professionals make economic and design decisions with insufficient feedback from experience, or input from objective building design, construction, and operations. Learn more about our sustainability and whole building

  3. 40 CFR 63.176 - Quality improvement program for pumps.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... and manufacturer; pump design (e.g., external shaft, flanged body); materials of construction; if... failure or of the pump leak and shall include recommendations, as appropriate, for design changes or..., operating or maintenance practices, and pump or pump seal designs or technologies that have poorer than...

  4. 14 CFR 25.697 - Lift and drag devices, controls.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... AIRCRAFT AIRWORTHINESS STANDARDS: TRANSPORT CATEGORY AIRPLANES Design and Construction Control Systems § 25.697 Lift and drag devices, controls. (a) Each lift device control must be designed so that the pilots... drag device control must be designed and located to make inadvertent operation improbable. Lift and...

  5. 14 CFR 25.697 - Lift and drag devices, controls.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... AIRCRAFT AIRWORTHINESS STANDARDS: TRANSPORT CATEGORY AIRPLANES Design and Construction Control Systems § 25.697 Lift and drag devices, controls. (a) Each lift device control must be designed so that the pilots... drag device control must be designed and located to make inadvertent operation improbable. Lift and...

  6. 14 CFR 25.697 - Lift and drag devices, controls.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... AIRCRAFT AIRWORTHINESS STANDARDS: TRANSPORT CATEGORY AIRPLANES Design and Construction Control Systems § 25.697 Lift and drag devices, controls. (a) Each lift device control must be designed so that the pilots... drag device control must be designed and located to make inadvertent operation improbable. Lift and...

  7. 14 CFR 25.697 - Lift and drag devices, controls.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... AIRCRAFT AIRWORTHINESS STANDARDS: TRANSPORT CATEGORY AIRPLANES Design and Construction Control Systems § 25.697 Lift and drag devices, controls. (a) Each lift device control must be designed so that the pilots... drag device control must be designed and located to make inadvertent operation improbable. Lift and...

  8. 76 FR 29728 - Notice of Intent To Prepare an Environmental Impact Statement and Notice of Potential Floodplain...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-23

    ... 2.0 program would proceed through 2020 with design, construction, operation, and monitoring... of this test includes project definition, design, procurement, manufacture, installation, startup... the repowered oxy-combustion design. The station contains existing infrastructure that could support...

  9. 10 CFR 52.171 - Finality of manufacturing licenses; information requests.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... required for issuance of a construction permit, operating license, combined license, in any hearing under... manufactured reactor, the costs and benefits of severe accident mitigation design alternatives, and the bases for not incorporating severe accident mitigation design alternatives into the design of the reactor to...

  10. Seven Experiment Designs Addressing Problems of Safety and Capacity on Two-Lane Rural Highways : Volume 3. Experimental Design to Evaluate MUTCD and Other Traffic Controls for Highway Construction and Maintenance Operations on Two-Lane Highways

    DOT National Transportation Integrated Search

    1996-11-01

    The purpose of Task A was to conduct a literature review of human factors-applicable articles associated with Advanced Traveler Information Systems (ATIS) and ATIS-related commercial vehicle operations (CVO) systems. Specifically, Task A was to asses...

  11. Improving Management of Military Construction Planning and Design

    DTIC Science & Technology

    1991-10-01

    waterfront facilities and operations and its transportation systems, owns and operates JFK Airport . The Port Authority has an extremely capable and...restructured, and many projects are being deferred until the economic picture brightens. Airline user fees are the principal source of income for the JFK ... Airport . This "downsizing" has caused major schedule readjustment and sequencing of designs to ensure compatibility with existing facilities. In managing

  12. Simulator test to study hot-flow problems related to a gas cooled reactor

    NASA Technical Reports Server (NTRS)

    Poole, J. W.; Freeman, M. P.; Doak, K. W.; Thorpe, M. L.

    1973-01-01

    An advance study of materials, fuel injection, and hot flow problems related to the gas core nuclear rocket is reported. The first task was to test a previously constructed induction heated plasma GCNR simulator above 300 kW. A number of tests are reported operating in the range of 300 kW at 10,000 cps. A second simulator was designed but not constructed for cold-hot visualization studies using louvered walls. A third task was a paper investigation of practical uranium feed systems, including a detailed discussion of related problems. The last assignment resulted in two designs for plasma nozzle test devices that could be operated at 200 atm on hydrogen.

  13. The ALICE Transition Radiation Detector: Construction, operation, and performance

    NASA Astrophysics Data System (ADS)

    Alice Collaboration

    2018-02-01

    The Transition Radiation Detector (TRD) was designed and built to enhance the capabilities of the ALICE detector at the Large Hadron Collider (LHC). While aimed at providing electron identification and triggering, the TRD also contributes significantly to the track reconstruction and calibration in the central barrel of ALICE. In this paper the design, construction, operation, and performance of this detector are discussed. A pion rejection factor of up to 410 is achieved at a momentum of 1 GeV/ c in p-Pb collisions and the resolution at high transverse momentum improves by about 40% when including the TRD information in track reconstruction. The triggering capability is demonstrated both for jet, light nuclei, and electron selection.

  14. Management of solid waste

    NASA Astrophysics Data System (ADS)

    Thompson, W. T.; Stinton, L. H.

    1980-04-01

    Compliance with the latest regulatory requirements addressing disposal of radioactive, hazardous, and sanitary solid waste criteria in the selection, design, and operation of solid waste management facilities. Due to the state of flux of these regulatory requirements from EPA and NRC, several waste management options were of solid waste. The current regulatory constraints and the design and operational requirements for construction of both storage and disposal facilities for use in management of DOE-ORO solid waste are highlighted. Capital operational costs are included for both disposal and storage options.

  15. Lake Charles CCS Project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Leib, Thomas; Cole, Dan

    In late September 2014 development of the Lake Charles Clean Energy (LCCE) Plant was abandoned resulting in termination of Lake Charles Carbon Capture and Sequestration (CCS) Project which was a subset the LCCE Plant. As a result, the project was only funded through Phase 2A (Design) and did not enter Phase 2B (Construction) or Phase 2C (Operations). This report was prepared relying on information prepared and provided by engineering companies which were engaged by Leucadia Energy, LLC to prepare or review Front End Engineering and Design (FEED) for the Lake Charles Clean Energy Project, which includes the Carbon Capture andmore » Sequestration (CCS) Project in Lake Charles, Louisiana. The Lake Charles Carbon Capture and Sequestration (CCS) Project was to be a large-scale industrial CCS project intended to demonstrate advanced technologies that capture and sequester carbon dioxide (CO 2) emissions from industrial sources into underground formations. The Scope of work was divided into two discrete sections; 1) Capture and Compression prepared by the Recipient Leucadia Energy, LLC, and 2) Transport and Sequestration prepared by sub-Recipient Denbury Onshore, LLC. Capture and Compression-The Lake Charles CCS Project Final Technical Report describes the systems and equipment that would be necessary to capture CO 2 generated in a large industrial gasification process and sequester the CO 2 into underground formations. The purpose of each system is defined along with a description of its equipment and operation. Criteria for selection of major equipment are provided and ancillary utilities necessary for safe and reliable operation in compliance with environmental regulations are described. Construction considerations are described including a general arrangement of the CCS process units within the overall gasification project. A cost estimate is provided, delineated by system area with cost breakdown showing equipment, piping and materials, construction labor, engineering, and other costs. The CCS Project Final Technical Report is based on a Front End Engineering and Design (FEED) study prepared by SK E&C, completed in [June] 2014. Subsequently, Fluor Enterprises completed a FEED validation study in mid-September 2014. The design analyses indicated that the FEED package was sufficient and as expected. However, Fluor considered the construction risk based on a stick-build approach to be unacceptable, but construction risk would be substantially mitigated through utilization of modular construction where site labor and schedule uncertainty is minimized. Fluor’s estimate of the overall EPC project cost utilizing the revised construction plan was comparable to SKE&C’s value after reflecting Fluor’s assessment of project scope and risk characteristic. Development was halted upon conclusion of Phase 2A FEED and the project was not constructed.Transport and Sequestration – The overall objective of the pipeline project was to construct a pipeline to transport captured CO 2 from the Lake Charles Clean Energy project to the existing Denbury Green Line and then to the Hastings Field in Southeast Texas to demonstrate effective geologic sequestration of captured CO 2 through commercial EOR operations. The overall objective of the MVA portion of the project was to demonstrate effective geologic sequestration of captured CO 2 through commercial Enhanced Oil Recovery (EOR) operations in order to evaluate costs, operational processes and technical performance. The DOE target for the project was to capture and implement a research MVA program to demonstrate the sequestration through EOR of approximately one million tons of CO 2 per year as an integral component of commercial operations.« less

  16. Constructed wetlands for wastewater and activated sludge treatment in north Greece: a review.

    PubMed

    Tsihrintzis, V A; Gikas, G D

    2010-01-01

    Constructed wetlands used for the treatment of urban, industrial and agricultural wastewater have become very popular treatment systems all over the world. In Greece, these systems are not very common, although the climate is favourable for their use. During recent years, there have been several attempts for the implementation of these systems in Greece, which include, among others, pilot-scale systems used for research, and full-scale systems designed and/or constructed to serve settlements or families. The purpose of this paper is the presentation of systems operating in Northern Greece, which have been studied by the Laboratory of Ecological Engineering and Technology of Democritus University of Thrace and others. A comparison is made of different system types, and the effect of various design and operational parameters is presented. Current research shows the good and continuous performance of these systems.

  17. Lean Production as an Innovative Approach to Construction

    NASA Astrophysics Data System (ADS)

    Spišáková, Marcela; Kozlovská, Mária

    2013-06-01

    Lean production presents a new approach to the construction management which has enabled enterprises to attain very high levels of efficiency, competitiveness and flexibility in production systems. Nowadays, a number of industrial processes are managed in accordance with these advanced management principles [1]. The principles of lean production are applied within the integrated design and delivery solutions (IDDS) and prefabricated construction. IDDS uses collaborative work processes and enhanced skills, with integrated data, information, and knowledge management to minimize structural and process inefficiencies and to enhance the value delivered during design, build, and operation, and across projects. Prefabrication presents a one of opportunities for construction methods, which allows the compliance with principles of sustainable design, provides the potential benefits such as faster construction, fewer housing defects, reduction in energy use and waste and elimination of environmental and safety risks. This paper presents the lean production within the IDDS and its potential in the modern prefabrication. There is created a field providing of benefits of lean production in construction industry.

  18. Variable-Delay Polarization Modulators for Cryogenic Millimeter-Wave Applications

    NASA Technical Reports Server (NTRS)

    Chuss, D. T.; Eimer, J. R.; Fixsen, D. J.; Hinderks, J.; Kogut, A. J.; Lazear, J.; Mirel, P.; Switzer, E.; Voellmer, G. M.; Wollack, E. J..

    2014-01-01

    We describe the design, construction, and initial validation of the variable-delay polarization modulator (VPM) designed for the PIPER cosmic microwave background polarimeter. The VPM modulates between linear and circular polarization by introducing a variable phase delay between orthogonal linear polarizations. Each VPM has a diameter of 39 cm and is engineered to operate in a cryogenic environment (1.5 K). We describe the mechanical design and performance of the kinematic double-blade flexure and drive mechanism along with the construction of the high precision wire grid polarizers.

  19. Space Habitat, assembly and repair facility

    NASA Technical Reports Server (NTRS)

    Colangelo, Todd A.; Hoetger, Debora C.; Kuo, Addison C.; Lo, Michael C.; Marcus, Leland R.; Tran, Phillip P.; Tutt, Chris J.; Wassmuth, Chad M.; Wildgrube, Gregory M.

    1992-01-01

    Integrated Space Systems (ISS) has designed a Low Earth Orbit Assembly Facility for submission in the 1992 AIAA/LORAL Team Space Design Competition. This facility, the Space Habitat, Assembly, and Repair Center (SHARC), will be used to construct, assemble, and service space vehicles. SHARC's primary mission will be the construction of interplanetary vehicles, but it will also be able to perform repair and refueling operations of craft which are in an Earth orbit. This facility has been designed using only present and near-present technology. The emphasis is on minimizing cost.

  20. Using GREENSCOPE for Sustainable Process Design: An Educational Opportunity

    EPA Science Inventory

    Increasing sustainability can be approached through the education of those who design, construct, and operate facilities. As chemical engineers learn elements of process systems engineering, they can be introduced to sustainability concepts. The EPA’s GREENSCOPE methodology and...

  1. Architects' perspectives on construction waste reduction by design

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Osmani, M.; Glass, J.; Price, A.D.F.

    2008-07-01

    The construction, demolition and excavation waste arising in England was estimated at 91 million tonnes in 2003. The current thinking on construction waste minimisation is heavily focussed on several issues relating to physical construction waste and recycling guides. Indeed, much had been published on ways to improve on-site waste management and recycling activities but very few attempts made to address the effect of design practices on waste generation. However, there is a consensus in the literature that the architect has a decisive role to play in helping to reduce waste by focussing on designing out waste. This paper examines previousmore » studies on architects' approach towards construction waste minimisation; and by means of a postal questionnaire, investigates: the origins of waste; waste minimisation design practices in the UK; and responsibilities and barriers within the UK architectural profession. The findings reveal that waste management is not a priority in the design process. Additionally, the architects seemed to take the view that waste is mainly produced during site operations and rarely generated during the design stages; however, about one-third of construction waste could essentially arise from design decisions. Results also indicate that a number of constraints, namely: lack of interest from clients; attitudes towards waste minimisation; and training all act as disincentives to a proactive and sustainable implementation of waste reduction strategies during the design process.« less

  2. Architects' perspectives on construction waste reduction by design.

    PubMed

    Osmani, M; Glass, J; Price, A D F

    2008-01-01

    The construction, demolition and excavation waste arising in England was estimated at 91 million tonnes in 2003. The current thinking on construction waste minimisation is heavily focussed on several issues relating to physical construction waste and recycling guides. Indeed, much had been published on ways to improve on-site waste management and recycling activities but very few attempts made to address the effect of design practices on waste generation. However, there is a consensus in the literature that the architect has a decisive role to play in helping to reduce waste by focussing on designing out waste. This paper examines previous studies on architects' approach towards construction waste minimisation; and by means of a postal questionnaire, investigates: the origins of waste; waste minimisation design practices in the UK; and responsibilities and barriers within the UK architectural profession. The findings reveal that waste management is not a priority in the design process. Additionally, the architects seemed to take the view that waste is mainly produced during site operations and rarely generated during the design stages; however, about one-third of construction waste could essentially arise from design decisions. Results also indicate that a number of constraints, namely: lack of interest from clients; attitudes towards waste minimisation; and training all act as disincentives to a proactive and sustainable implementation of waste reduction strategies during the design process.

  3. 47 CFR 90.725 - Construction requirements for Phase I licensees.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... granted commercial nationwide authorizations will be required to construct base stations and placed those base stations in operation as follows: (1) In at least 10 percent of the geographic areas designated in the application within two years of initial license grant, including base stations in at least seven...

  4. 9 CFR 3.1 - Housing facilities, general.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... Transportation of Dogs and Cats 1 Facilities and Operating Standards § 3.1 Housing facilities, general. (a) Structure; construction. Housing facilities for dogs and cats must be designed and constructed so that they... apply only to live dogs and cats, unless stated otherwise. (b) Condition and site. Housing facilities...

  5. 9 CFR 3.1 - Housing facilities, general.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Transportation of Dogs and Cats 1 Facilities and Operating Standards § 3.1 Housing facilities, general. (a) Structure; construction. Housing facilities for dogs and cats must be designed and constructed so that they... apply only to live dogs and cats, unless stated otherwise. (b) Condition and site. Housing facilities...

  6. Schools of Interest 5.

    ERIC Educational Resources Information Center

    North Carolina State Dept. of Public Instruction, Raleigh. Div. of School Planning.

    North Carolina local public school boards have the statutory responsibility for operating public schools and for entering into contracts for design and construction of their schools. This document presents examples of plans for school buildings planned or constructed during the last few years, as of 1981, representing a wide range of educational…

  7. Communications among elements of a space construction ensemble

    NASA Technical Reports Server (NTRS)

    Davis, Randal L.; Grasso, Christopher A.

    1989-01-01

    Space construction projects will require careful coordination between managers, designers, manufacturers, operators, astronauts, and robots with large volumes of information of varying resolution, timeliness, and accuracy flowing between the distributed participants over computer communications networks. Within the CSC Operations Branch, we are researching the requirements and options for such communications. Based on our work to date, we feel that communications standards being developed by the International Standards Organization, the CCITT, and other groups can be applied to space construction. We are currently studying in depth how such standards can be used to communicate with robots and automated construction equipment used in a space project. Specifically, we are looking at how the Manufacturing Automation Protocol (MAP) and the Manufacturing Message Specification (MMS), which tie together computers and machines in automated factories, might be applied to space construction projects. Together with our CSC industrial partner Computer Technology Associates, we are developing a MAP/MMS companion standard for space construction and we will produce software to allow the MAP/MMS protocol to be used in our CSC operations testbed.

  8. Phase Change Material Heat Sink for an ISS Flight Experiment

    NASA Technical Reports Server (NTRS)

    Quinn, Gregory; Stieber, Jesse; Sheth, Rubik; Ahlstrom, Thomas

    2015-01-01

    A flight experiment is being constructed to utilize the persistent microgravity environment of the International Space Station (ISS) to prove out operation of a microgravity compatible phase change material (PCM) heat sink. A PCM heat sink can help to reduce the overall mass and volume of future exploration spacecraft thermal control systems (TCS). The program is characterizing a new PCM heat sink that incorporates a novel phase management approach to prevent high pressures and structural deformation that often occur with PCM heat sinks undergoing cyclic operation in microgravity. The PCM unit was made using brazed aluminum construction with paraffin wax as the fusible material. It is designed to be installed into a propylene glycol and water cooling loop, with scaling consistent with the conceptual designs for the Orion Multipurpose Crew Vehicle. This paper reports on the construction of the PCM heat sink and on initial ground test results conducted at UTC Aerospace Systems prior to delivery to NASA. The prototype will be tested later on the ground and in orbit via a self-contained experiment package developed by NASA Johnson Space Center to operate in an ISS EXPRESS rack.

  9. 76 FR 15001 - Entergy Nuclear Operations, Inc,. Entergy Nuclear Vermont Yankee, LLC, Vermont Yankee Nuclear...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-18

    ... understand VY's design, layout, and construction. This failure to comprehend and understand the layout... Facilities,'' and General Design Criteria 60, ``Control of Releases of Radioactive Materials to the Environment,'' and 64, ``Monitoring Radioactivity Releases,'' of Appendix A, ``General Design Criteria for...

  10. 14 CFR 33.65 - Surge and stall characteristics.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... Section 33.65 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION AIRCRAFT AIRWORTHINESS STANDARDS: AIRCRAFT ENGINES Design and Construction; Turbine Aircraft Engines § 33.65 Surge and stall characteristics. When the engine is operated in accordance with operating instructions required by...

  11. 14 CFR 33.65 - Surge and stall characteristics.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Section 33.65 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION AIRCRAFT AIRWORTHINESS STANDARDS: AIRCRAFT ENGINES Design and Construction; Turbine Aircraft Engines § 33.65 Surge and stall characteristics. When the engine is operated in accordance with operating instructions required by...

  12. 40 CFR 418.15 - Standards of performance for new sources.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ...) EFFLUENT GUIDELINES AND STANDARDS FERTILIZER MANUFACTURING POINT SOURCE CATEGORY Phosphate Subcategory... calcium sulfate storage pile runoff facility operated separately or in combination with a water recirculation system designed, constructed and operated to maintain a surge capacity equal to the runoff from...

  13. 40 CFR 418.15 - Standards of performance for new sources.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ...) EFFLUENT GUIDELINES AND STANDARDS FERTILIZER MANUFACTURING POINT SOURCE CATEGORY Phosphate Subcategory... calcium sulfate storage pile runoff facility operated separately or in combination with a water recirculation system designed, constructed and operated to maintain a surge capacity equal to the runoff from...

  14. 40 CFR 418.15 - Standards of performance for new sources.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ...) EFFLUENT GUIDELINES AND STANDARDS FERTILIZER MANUFACTURING POINT SOURCE CATEGORY Phosphate Subcategory... calcium sulfate storage pile runoff facility operated separately or in combination with a water recirculation system designed, constructed and operated to maintain a surge capacity equal to the runoff from...

  15. Magnetic-Nozzle Studies for Fusion Propulsion Applications: Gigawatt Plasma Source Operation and Magnetic Nozzle Analysis

    NASA Technical Reports Server (NTRS)

    Gilland, James H.; Mikekkides, Ioannis; Mikellides, Pavlos; Gregorek, Gerald; Marriott, Darin

    2004-01-01

    This project has been a multiyear effort to assess the feasibility of a key process inherent to virtually all fusion propulsion concepts: the expansion of a fusion-grade plasma through a diverging magnetic field. Current fusion energy research touches on this process only indirectly through studies of plasma divertors designed to remove the fusion products from a reactor. This project was aimed at directly addressing propulsion system issues, without the expense of constructing a fusion reactor. Instead, the program designed, constructed, and operated a facility suitable for simulating fusion reactor grade edge plasmas, and to examine their expansion in an expanding magnetic nozzle. The approach was to create and accelerate a dense (up to l0(exp 20)/m) plasma, stagnate it in a converging magnetic field to convert kinetic energy to thermal energy, and examine the subsequent expansion of the hot (100's eV) plasma in a subsequent magnetic nozzle. Throughout the project, there has been a parallel effort between theoretical and numerical design and modelling of the experiment and the experiment itself. In particular, the MACH2 code was used to design and predict the performance of the magnetoplasmadynamic (MPD) plasma accelerator, and to design and predict the design and expected behavior for the magnetic field coils that could be added later. Progress to date includes the theoretical accelerator design and construction, development of the power and vacuum systems to accommodate the powers and mass flow rates of interest to out research, operation of the accelerator and comparison to theoretical predictions, and computational analysis of future magnetic field coils and the expected performance of an integrated source-nozzle experiment.

  16. Telerobotic workstation design aid

    NASA Technical Reports Server (NTRS)

    Corker, K.; Hudlicka, E.; Young, D.; Cramer, N.

    1989-01-01

    Telerobot systems are being developed to support a number of space mission applications. In low earth orbit, telerobots and teleoperated manipulators will be used in shuttle operations and space station construction/maintenance. Free flying telerobotic service vehicles will be used at low and geosynchronous orbital operations. Rovers and autonomous vehicles will be equipped with telerobotic devices in planetary exploration. In all of these systems, human operators will interact with the robot system at varied levels during the scheduled operations. The human operators may be in either orbital or ground-based control systems. To assure integrated system development and maximum utility across these systems, designers must be sensitive to the constraints and capabilities that the human brings to system operation and must be assisted in applying these human factors to system development. The simulation and analysis system is intended to serve the needs of system analysis/designers as an integrated workstation in support of telerobotic design.

  17. Y-12 Industrial Landfill V. Permit application modifications

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1995-09-01

    This report contains the modifications in operations and design to meet the Tennessee Department of Environment and Conversation (TDEC) July 10, 1993, amendments to the regulations for Class 2 landfills. These modifications, though extensive in design and construction cost, are considered minor revisions and should not require a processing fee. Area 1 of ILF V, comprising approximately 20% of the ILF V footprint, was designed and submitted to TDEC prior to the implementation of current regulations. This initial area was constructed with a compacted clay liner and leachate collection system, and became operational in April 1994. The current regulations requiremore » landfills to have a composite liner with leachate collection system and closure cap. Modifications to upgrade Areas 2 and 3 of ILF V to meet the current TDEC requirements are included.« less

  18. A spherically-shaped PZT thin film ultrasonic transducer with an acoustic impedance gradient matching layer based on a micromachined periodically structured flexible substrate.

    PubMed

    Feng, Guo-Hua; Liu, Wei-Fan

    2013-10-09

    This paper presents the microfabrication of an acoustic impedance gradient matching layer on a spherically-shaped piezoelectric ultrasonic transducer. The acoustic matching layer can be designed to achieve higher acoustic energy transmission and operating bandwidth. Also included in this paper are a theoretical analysis of the device design and a micromachining technique to produce the novel transducer. Based on a design of a lead titanium zirconium (PZT) micropillar array, the constructed gradient acoustic matching layer has much better acoustic transmission efficiency within a 20-50 MHz operation range compared to a matching layer with a conventional quarter-wavelength thickness Parylene deposition. To construct the transducer, periodic microcavities are built on a flexible copper sheet, and then the sheet forms a designed curvature with a ball shaping. After PZT slurry deposition, the constructed PZT micropillar array is released onto a curved thin PZT layer. Following Parylene conformal coating on the processed PZT micropillars, the PZT micropillars and the surrounding Parylene comprise a matching layer with gradient acoustic impedance. By using the proposed technique, the fabricated transducer achieves a center frequency of 26 MHz and a -6 dB bandwidth of approximately 65%.

  19. The challenge of logistics facilities development

    NASA Technical Reports Server (NTRS)

    Davis, James R.

    1987-01-01

    The paper discusses the experiences of a group of engineers and logisticians at John F. Kennedy Space center in the design, construction and activation of a consolidated logistics facility for support of Space Transportation System ground operations and maintenance. The planning, methodology and processes are covered, with emphasis placed on unique aspects and lessons learned. The project utilized a progressive design, baseline and build concept for each phase of construction, with the Government exercising funding and configuration oversight.

  20. Ternary Magnesium-Lithium Base Constitution Diagrams and Magnesium Alloys of Low Alloy Additions

    DTIC Science & Technology

    1951-03-01

    progress In eperimental development of mgmesiu-bease &alls with low alloy additions. The primry purpose of this investiptiU is to obtain alloys baving a...Casting Magnesium-Lithium Base Ternary Alloys Melting and Castirg Technigue The design , construction and operation of equipment for melting and...protection during heat treatment were: 1. Design and construction of a specimen container to hold a number of specimens in an inert atmosphere in order to WAC

  1. 18 CFR 157.208 - Construction, acquisition, operation, replacement, and miscellaneous rearrangement of facilities.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... applicant's existing facilities; (5) A flow diagram or comparative study showing daily design capacity... designed to meet the goal of limiting the perceived noise at NSAs to an Ldn of 55 dBA or what mitigation...

  2. 18 CFR 157.208 - Construction, acquisition, operation, replacement, and miscellaneous rearrangement of facilities.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... applicant's existing facilities; (5) A flow diagram or comparative study showing daily design capacity... designed to meet the goal of limiting the perceived noise at NSAs to an Ldn of 55 dBA or what mitigation...

  3. 18 CFR 157.208 - Construction, acquisition, operation, replacement, and miscellaneous rearrangement of facilities.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... applicant's existing facilities; (5) A flow diagram or comparative study showing daily design capacity... designed to meet the goal of limiting the perceived noise at NSAs to an Ldn of 55 dBA or what mitigation...

  4. 18 CFR 157.208 - Construction, acquisition, operation, replacement, and miscellaneous rearrangement of facilities.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... applicant's existing facilities; (5) A flow diagram or comparative study showing daily design capacity... designed to meet the goal of limiting the perceived noise at NSAs to an Ldn of 55 dBA or what mitigation...

  5. 18 CFR 157.208 - Construction, acquisition, operation, replacement, and miscellaneous rearrangement of facilities.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... applicant's existing facilities; (5) A flow diagram or comparative study showing daily design capacity... designed to meet the goal of limiting the perceived noise at NSAs to an Ldn of 55 dBA or what mitigation...

  6. 40 CFR 267.1103 - What additional design and operating standards apply if liquids will be in my containment building?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... the migration of hazardous constituents into the barrier (for example, a geomembrane covered by a... containment system, including a secondary barrier designed and constructed to prevent migration of hazardous...

  7. 40 CFR 267.1103 - What additional design and operating standards apply if liquids will be in my containment building?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... the migration of hazardous constituents into the barrier (for example, a geomembrane covered by a... containment system, including a secondary barrier designed and constructed to prevent migration of hazardous...

  8. Design and Fabrication of an MRI-Compatible, Autonomous Incubation System.

    PubMed

    Khalilzad-Sharghi, Vahid; Xu, Huihui

    2015-10-01

    Tissue engineers have long sought access to an autonomous, imaging-compatible tissue incubation system that, with minimum operator handling, can provide real-time visualization and quantification of cells, tissue constructs, and organs. This type of screening system, capable of operating noninvasively to validate tissue, can overcome current limitations like temperature shock, unsustainable cellular environments, sample contamination, and handling/stress. However, this type of system has been a major challenge, until now. Here, we describe the design, fabrication, and characterization of an innovative, autonomous incubation system that is compatible with a 9.4 T magnetic resonance imaging (MRI) scanner. Termed the e-incubator (patent pending; application number: 13/953,984), this microcontroller-based system is integrated into an MRI scanner and noninvasively screens cells and tissue cultures in an environment where temperature, pH, and media/gas handling are regulated. The 4-week study discussed herein details the continuous operation of the e-incubator for a tissue-engineered osteogenic construct, validated by LIVE/DEAD(®) cell assays and histology. The evolving MR quantitative parameters of the osteogenic construct were used as biomarkers for bone tissue engineering and to further validate the quality of the product noninvasively before harvesting. Importantly, the e-incubator reliably facilitates culturing cells and tissue constructs to create engineered tissues and/or investigate disease therapies.

  9. Cost containment and KSC Shuttle facilities or cost containment and aerospace construction

    NASA Technical Reports Server (NTRS)

    Brown, J. A.

    1985-01-01

    This presentation has the objective to show examples of Cost Containment of Aerospace Construction at Kennedy Space Center (KSC), taking into account four major levels of Project Development of the Space Shuttle Facilities. The levels are related to conceptual criteria and site selection, the design of construction and ground support equipment, the construction of facilities and ground support equipment (GSE), and operation and maintenance. Examples of cost containment are discussed. The continued reduction of processing time from landing to launching represents a demonstration of the success of the cost containment methods. Attention is given to the factors which led to the selection of KSC, the use of Cost Engineering, the employment of the Construction Management Concept, and the use of Computer Aided Design/Drafting.

  10. Complex solution of problem of all-season construction of roads and pipelines on universal composite pontoon units

    NASA Astrophysics Data System (ADS)

    Ryabkov, A. V.; Stafeeva, N. A.; Ivanov, V. A.; Zakuraev, A. F.

    2018-05-01

    A complex construction consisting of a universal floating pontoon road for laying pipelines in automatic mode on its body all year round and in any weather for Siberia and the Far North has been designed. A new method is proposed for the construction of pipelines on pontoon modules, which are made of composite materials. Pontoons made of composite materials for bedding pipelines with track-forming guides for automated wheeled transport, pipelayer, are designed. The proposed system eliminates the construction of a road along the route, ensures the buoyancy and smoothness of the self-propelled automated stacker in the form of a "centipede", which has a number of significant advantages in the construction and operation of the entire complex in the swamp and watered areas without overburden.

  11. Heavy Equipment Operator: General Equipment Operator. Instructional Materials.

    ERIC Educational Resources Information Center

    Hendrix, Laborn J.; Sawatzky, Joyce

    Developed through close coordination between contractors, construction workers, and vocational educators, this instructor's manual is designed to help heavy equipment instructors present materials in a systematic format. The instructional materials in the manual are written in terms of student performance, using measurable behavioral objectives.…

  12. 33 CFR 159.119 - Operability test; temperature range.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 33 Navigation and Navigable Waters 2 2011-07-01 2011-07-01 false Operability test; temperature range. 159.119 Section 159.119 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) POLLUTION MARINE SANITATION DEVICES Design, Construction, and Testing § 159.119...

  13. AP1000{sup R} licensing and deployment in the United States

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Jordan, R. P.; Russ, P. A.; Filiak, P. P.

    2012-07-01

    In recent years, both domestic and foreign utilities have turned to the standardized Westinghouse AP1000 plant design in satisfying their near - and long-term - sustainable energy needs. As direct support to these actions, licensing the AP1000 design has played a significant role by providing one of the fundamental bases in clearing regulatory hurdles leading to the start of new plant construction. Within the U.S. alone, Westinghouse AP1000 licensing activities have reached unprecedented milestones with the approvals of both AP1000 Design Certification and Southern Company's combined construction permit and operating license (COL) application directly supporting the construction of two newmore » nuclear plants in Georgia. Further COL application approvals are immediately pending for an additional two AP1000 plants in South Carolina. And, across the U.S. nuclear industry spectrum, there are 10 other COL applications under regulatory review representing some 16 new plants at 10 sites. In total, these actions represent the first wave of new plant licensing under the regulatory approval process since 1978. Fundamental to the Nuclear Regulatory Commission's AP1000 Design Certification is the formal recognition of the AP1000 passive safety design through regulatory acceptance rulemaking. Through recognition and deployment of the AP1000 Design Certification, the utility licensee / operator of this reactor design are now offered an opportunity to use a simplified 'one-step' combined license process, thereby managing substantial back-end construction schedule risk from regulatory and intervention delays. Application of this regulatory philosophy represents both acceptance and encouragement of standardized reactor designs like the AP1000. With the recent AP1000 Design Certification and utility COL acceptances, the fundamental licensing processes of this philosophy have successfully proven the attainment of significant milestones with the next stage licensing actions directed towards deployment. AP1000 Design Certification and COL deployment, and management of the plant construction in accordance with the conditions within these approvals, remain as significant site and corporate responsibilities. These licensing-construction integrated activities must now focus on identifying and resolving 'as-built' departures from the standardized design as assessed against the certified AP1000 technical and licensing basis. Within this paper, significant aspects of the AP1000 U.S. licensing will be discussed, including identifying systems and processes used in ensuring compliance while deploying the standardized design. Critical licensing steps, licensing deployment actions as plant construction progresses and defining the road forward to a successful completion of licensing actions will be addressed. (authors)« less

  14. Design and Construction Multi Output Power Transmition with Single Prime Mover on Agricultural Products Machine

    NASA Astrophysics Data System (ADS)

    Koten, V. K.; Tanamal, C. E.

    2017-03-01

    Manufacturing agricultural products by the farmers, people or person who involve in medium industry, small industry, and households industry still be done in separately. Although the power on primemover is enough, in operations, primemover was only to move one of several agricultural products machine. This study attempts to design and construct power transmition multi output with single primemover; a single construction that allows primemover move some agricultur products machine in the same or not. This study begins with the determination of production capacity and the power to destroy products, the determination of resources and rotation, normalization of resources and rotation, the determination of the type material used, the size determination of each machine elements, construction machine elements, and assemble machine elements into a construction multi output power transmition with single primemover on agricultural products machine. The results show that with a input normalization 4 PK (2984 Watt), rotation 2000 rpm, the strength of material 60 kg/mm2, and several operating consideration, thus obtained size of machine elements through calculation. Based on the size, the machine elements is made through the use of some machine tools and assembled to form a multi output power transmition with single primemover.

  15. Shaft seals with an easily removable cylinder holder for low-pressure steam turbines

    NASA Astrophysics Data System (ADS)

    Zakharov, A. E.; Rodionov, D. A.; Pimenov, E. V.; Sobolev, A. S.

    2016-01-01

    The article is devoted to the problems that occur at the operation of LPC shaft seals (SS) of turbines, particularly, their bearings. The problems arising from the deterioration of oil-protecting rings of SS and bearings and also the consequences in which they can result are considered. The existing SS housing construction types are considered. Their operational features are specified. A new SS construction type with an easily removable holder is presented. The construction of its main elements is described. The sequence of operations of the repair personnel at the restoration of the new SS type spacings is proposed. The comparative analysis of the new and the existing SS construction types is carried out. The assessment results of the efficiency, the operational convenience, and the economic effect after the installation of the new type seals are given. The conclusions about the offered construction prospects are made by results of the comparative analysis and the carried-out assessment. The main advantage of this design is the possibility of spacings restoration both in SS and in oil-protecting rings during a short-term stop of a turbine, even without its cooling. This construction was successfully tested on the working K-300-23.5 LMP turbine. However, its adaptation for other turbines is quite possible.

  16. Establishing a design for passive vertical flow constructed wetlands treating small sewage discharges to meet British Standard EN 12566.

    PubMed

    Weedon, Christopher Michael; Murphy, Clodagh; Sweaney, Geoff

    2017-01-01

    Owing to legislation change (which made General Binding Rules effective from 1 January 2015) unless discharge is to specified environmentally sensitive sites, small sewage discharges (SSDs) in England - that is, <2 m 3  d -1 to ground; <5 m 3  d -1 to surface waters - no longer require an Environmental Permit (EP) and need not be registered for exemption, provided discharge to surface waters is preceded by treatment using equipment complying with BS EN 12566. This effectively excludes the use of treatment wetlands, unless covered by an EP, because the cost of certification to EN 12566 for bespoke designs is prohibitive. EPs take up to four months to obtain. Therefore, the new legislation has created a commercial disadvantage for constructed wetlands treating SSDs, compared with mass-produced sewage treatment plants. However, the UK statutory pollution regulators have maintained a dialogue with the Constructed Wetland Association (CWA), with a view to assessing whether treatment of SSD using constructed wetlands might be allowable, without requiring EPs. This paper presents treatment performance data obtained over 15 years, from a variety of full-scale operational treatment wetlands, as supporting evidence for design guidelines, proposed by the CWA to the UK regulators, for the implementation of constructed wetlands continuously passively treating SSD to 20:30:20 mg l -1 BOD/SS/NH4-N under a wide range of loading rates. Relevant experience of UK designers, installers and operators since the early 1990s is included, resulting in recommended physical design criteria and loading rates for compact vertical flow reed beds, presented here as key elements of the draft guidelines.

  17. The importance of ergonomics to sustainability throughout a building's life cycle.

    PubMed

    Miller, Linda; Dorsey, Julie; Jacobs, Karen

    2012-01-01

    Protecting and conserving environmental resources is a global concern. Over the past decade, a number of certification processes have emerged to help designers and operators of buildings assess the potential impact of a building on the environment. Certifications such as the Leadership in Energy and Environmental Design (LEED) consider the environmental impact through the lifecycle of a building, but may not be considering the people that construct and utilize it. It is important to remember the human factor. Considering the human factor throughout the lifecycle is crucial to ensure individuals are protected during construction and in operation in the built environment. The paper highlights how ergonomics can be integrated into the life cycle of a building to promote sustainability goals for both the human factor and the environment. A case study approach will be used to illustrate how ergonomics was integrated into a LEED renovation and expanded into its daily operations on a large university campus..

  18. Construction and Utilization of a Beowulf Computing Cluster: A User's Perspective

    NASA Technical Reports Server (NTRS)

    Woods, Judy L.; West, Jeff S.; Sulyma, Peter R.

    2000-01-01

    Lockheed Martin Space Operations - Stennis Programs (LMSO) at the John C Stennis Space Center (NASA/SSC) has designed and built a Beowulf computer cluster which is owned by NASA/SSC and operated by LMSO. The design and construction of the cluster are detailed in this paper. The cluster is currently used for Computational Fluid Dynamics (CFD) simulations. The CFD codes in use and their applications are discussed. Examples of some of the work are also presented. Performance benchmark studies have been conducted for the CFD codes being run on the cluster. The results of two of the studies are presented and discussed. The cluster is not currently being utilized to its full potential; therefore, plans are underway to add more capabilities. These include the addition of structural, thermal, fluid, and acoustic Finite Element Analysis codes as well as real-time data acquisition and processing during test operations at NASA/SSC. These plans are discussed as well.

  19. Introduction of Building Information Modeling (BIM) Technologies in Construction

    NASA Astrophysics Data System (ADS)

    Milyutina, M. A.

    2018-05-01

    The issues of introduction of building information modeling (BIM) in construction industry are considered in this work. The advantages of this approach and perspectives of the transition to new design technologies, construction process management, and operation in the near future are stated. The importance of development of pilot projects that should identify the ways and means of verification of the regulatory and technical base, as well as economic indicators in the transition to Building Information Technologies in the construction, is noted.

  20. 77 FR 56817 - Notice of Public Hearings for the Draft Environmental Impact Statement for Medical Facilities...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-14

    ... buildings (Buildings 2, 4, 6, 7, and 8) and construction of a single 5-story replacement facility in the... clinics; incorporate evidence-based design; include expansion of technology; and allow for operational... regulation. 2. MFD--demolition of five hospital buildings, construction of a single 5-story replacement...

  1. 23 CFR 661.5 - What definitions apply to this regulation?

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... prescribed scope of work. Preliminary engineering (PE) means planning, survey, design, engineering, and... survey staking functions considered necessary for effective control of the construction operations... carrying capacity (comparison of the original design load to the State legal load), clearance, or approach...

  2. 23 CFR 661.5 - What definitions apply to this regulation?

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... prescribed scope of work. Preliminary engineering (PE) means planning, survey, design, engineering, and... survey staking functions considered necessary for effective control of the construction operations... carrying capacity (comparison of the original design load to the State legal load), clearance, or approach...

  3. 23 CFR 661.5 - What definitions apply to this regulation?

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... prescribed scope of work. Preliminary engineering (PE) means planning, survey, design, engineering, and... survey staking functions considered necessary for effective control of the construction operations... carrying capacity (comparison of the original design load to the State legal load), clearance, or approach...

  4. 23 CFR 661.5 - What definitions apply to this regulation?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... prescribed scope of work. Preliminary engineering (PE) means planning, survey, design, engineering, and... survey staking functions considered necessary for effective control of the construction operations... carrying capacity (comparison of the original design load to the State legal load), clearance, or approach...

  5. 23 CFR 661.5 - What definitions apply to this regulation?

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... prescribed scope of work. Preliminary engineering (PE) means planning, survey, design, engineering, and... survey staking functions considered necessary for effective control of the construction operations... carrying capacity (comparison of the original design load to the State legal load), clearance, or approach...

  6. Design and Construction of a Portable Oculometer for Use in Transportation Oriented Human Factors Studies

    DOT National Transportation Integrated Search

    1971-08-01

    THE REPORT DESCRIBES DEVELOPMENT OF AN INSTRUMENT DESIGNED TO ACQUIRE AND PROCESS INFORMATION ABOUT HUMAN VISUAL PERFORMANCE. THE INSTRUMENT HAS THE FOLLOWING FEATURES: IT CAN BE OPERATED IN A VARIETY OF TRANSPORTATION ENVIRONMENTS INCLUDING SIMULATO...

  7. 14 CFR 27.671 - General.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... STANDARDS: NORMAL CATEGORY ROTORCRAFT Design and Construction Control Systems § 27.671 General. (a) Each control and control system must operate with the ease, smoothness, and positiveness appropriate to its function. (b) Each element of each flight control system must be designed, or distinctively and permanently...

  8. 14 CFR 27.671 - General.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... STANDARDS: NORMAL CATEGORY ROTORCRAFT Design and Construction Control Systems § 27.671 General. (a) Each control and control system must operate with the ease, smoothness, and positiveness appropriate to its function. (b) Each element of each flight control system must be designed, or distinctively and permanently...

  9. It's Not Easy Building Green.

    ERIC Educational Resources Information Center

    Higgins, Joseph

    2003-01-01

    Discusses green buildings, facilities designed, constructed, and operated in an environmentally friendly and resource-efficient way. Discusses reasons for campuses to "go green," the "shades of green" or variations in environmental-friendliness, certification through the Leadership in Energy and Environmental Design (LEED) rating system, financial…

  10. Lightweight Inexpensive Ozone Lidar Telescope Using a Plastic Fresnel Lens

    NASA Technical Reports Server (NTRS)

    DeYoung, Russell J.; Notari, Anthony; Carrion, William; Pliutau, Denis

    2014-01-01

    An inexpensive lightweight ozone lidar telescope was designed, constructed and operated during an ozone lidar field campaign. This report summarizes the design parameters and performance of the plastic Fresnel lens telescope and shows the ozone lidar performance compared to Zemax calculations.

  11. 14 CFR 27.671 - General.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... STANDARDS: NORMAL CATEGORY ROTORCRAFT Design and Construction Control Systems § 27.671 General. (a) Each control and control system must operate with the ease, smoothness, and positiveness appropriate to its function. (b) Each element of each flight control system must be designed, or distinctively and permanently...

  12. 14 CFR 29.671 - General.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... STANDARDS: TRANSPORT CATEGORY ROTORCRAFT Design and Construction Control Systems § 29.671 General. (a) Each control and control system must operate with the ease, smoothness, and positiveness appropriate to its function. (b) Each element of each flight control system must be designed, or distinctively and permanently...

  13. 14 CFR 25.671 - General.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... STANDARDS: TRANSPORT CATEGORY AIRPLANES Design and Construction Control Systems § 25.671 General. (a) Each control and control system must operate with the ease, smoothness, and positiveness appropriate to its function. (b) Each element of each flight control system must be designed, or distinctively and permanently...

  14. 14 CFR 25.671 - General.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... STANDARDS: TRANSPORT CATEGORY AIRPLANES Design and Construction Control Systems § 25.671 General. (a) Each control and control system must operate with the ease, smoothness, and positiveness appropriate to its function. (b) Each element of each flight control system must be designed, or distinctively and permanently...

  15. 14 CFR 25.671 - General.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... STANDARDS: TRANSPORT CATEGORY AIRPLANES Design and Construction Control Systems § 25.671 General. (a) Each control and control system must operate with the ease, smoothness, and positiveness appropriate to its function. (b) Each element of each flight control system must be designed, or distinctively and permanently...

  16. 14 CFR 27.671 - General.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... STANDARDS: NORMAL CATEGORY ROTORCRAFT Design and Construction Control Systems § 27.671 General. (a) Each control and control system must operate with the ease, smoothness, and positiveness appropriate to its function. (b) Each element of each flight control system must be designed, or distinctively and permanently...

  17. 14 CFR 27.671 - General.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... STANDARDS: NORMAL CATEGORY ROTORCRAFT Design and Construction Control Systems § 27.671 General. (a) Each control and control system must operate with the ease, smoothness, and positiveness appropriate to its function. (b) Each element of each flight control system must be designed, or distinctively and permanently...

  18. 14 CFR 25.671 - General.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... STANDARDS: TRANSPORT CATEGORY AIRPLANES Design and Construction Control Systems § 25.671 General. (a) Each control and control system must operate with the ease, smoothness, and positiveness appropriate to its function. (b) Each element of each flight control system must be designed, or distinctively and permanently...

  19. 33 CFR 149.660 - What are the requirements for emergency power?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... SECURITY (CONTINUED) DEEPWATER PORTS DEEPWATER PORTS: DESIGN, CONSTRUCTION, AND EQUIPMENT Design and... complex must have emergency power equipment including power source, associated transforming equipment, and...; (4) Radar equipment; (5) Alarm systems; (6) Electrically operated fire pumps; and (7) Other...

  20. 33 CFR 149.660 - What are the requirements for emergency power?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... SECURITY (CONTINUED) DEEPWATER PORTS DEEPWATER PORTS: DESIGN, CONSTRUCTION, AND EQUIPMENT Design and... complex must have emergency power equipment including power source, associated transforming equipment, and...; (4) Radar equipment; (5) Alarm systems; (6) Electrically operated fire pumps; and (7) Other...

  1. 40 CFR 60.540 - Applicability and designation of affected facilities.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Performance for the Rubber Tire Manufacturing Industry § 60.540 Applicability and designation of affected... each of the following affected facilities in rubber tire manufacturing plants that commence... cementing operation in rubber tire manufacturing plants that commenced construction, modification, or...

  2. A practical guide to the design and construction of a single wire beverage antenna

    NASA Astrophysics Data System (ADS)

    Spong, H. L.

    1980-09-01

    Theoretical results are presented which show the performance likely to result from using differing antenna heights, lengths and wire sizes and from operating with different ground conductivities. These studies were undertaken to provide practical advice for constructors and operators. Design parameters can be easily obtained with the aid of computer programs and an antenna can be rapidly constructed from readily available materials. Directivity can be increased by adding more elements, either in parallel or on a radial basis. A particular performance can be achieved with great latitude in the parameters. Good low angle performance can be achieved without large ground screens. A directional array can be made by switching between a number of elements set up on different bearings.

  3. The ALICE Transition Radiation Detector: Construction, operation, and performance

    DOE PAGES

    Acharya, S; Adam, J; Adamova, D; ...

    2017-09-21

    The Transition Radiation Detector (TRD) was designed and built to enhance the capabilities of the ALICE detector at the Large Hadron Collider (LHC). While aimed at providing electron identification and triggering, the TRD also contributes significantly to the track reconstruction and calibration in the central barrel of ALICE. In this article, the design, construction, operation, and performance of this detector are discussed. A pion rejection factor of up to 410 is achieved at a momentum of 1 GeV/c in p-Pb collisions and the resolution at high transverse momentum improves by about 40% when including the TRD information in track reconstruction.more » The triggering capability is demonstrated both for jet, light nuclei, and electron selection.« less

  4. The ALICE Transition Radiation Detector: Construction, operation, and performance

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Acharya, S; Adam, J; Adamova, D

    The Transition Radiation Detector (TRD) was designed and built to enhance the capabilities of the ALICE detector at the Large Hadron Collider (LHC). While aimed at providing electron identification and triggering, the TRD also contributes significantly to the track reconstruction and calibration in the central barrel of ALICE. In this article, the design, construction, operation, and performance of this detector are discussed. A pion rejection factor of up to 410 is achieved at a momentum of 1 GeV/c in p-Pb collisions and the resolution at high transverse momentum improves by about 40% when including the TRD information in track reconstruction.more » The triggering capability is demonstrated both for jet, light nuclei, and electron selection.« less

  5. Electron Lens Construction for the Integrable Optics Test Accelerator at Fermilab

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    McGee, Mike; Carlson, Kermit; Nobrega, Lucy

    The Integrable Optics Test Accelerator (IOTA) is proposed for operation at Fermilab. The goal of IOTA is to create practical nonlinear accelerator focusing systems with a large frequency spread and stable particle motion. The IOTA is a 40 m circumference, 150 MeV (e-), 2.5 MeV (p⁺) diagnostic test ring. Construction of an electron lens for IOTA is necessary for both electron and proton operation. Components required for the Electron Lens design include; a 0.8 T conventional water-cooled main solenoid, and magnetic bending and focusing elements. The foundation of the design relies on repurposing the Fermilab Tevatron Electron Lens II (TELII)more » gun and collector under ultra-high vacuum (UHV) conditions.« less

  6. Wave Phase-Sensitive Transformation of 3d-Straining of Mechanical Fields

    NASA Astrophysics Data System (ADS)

    Smirnov, I. N.; Speranskiy, A. A.

    2015-11-01

    It is the area of research of oscillatory processes in elastic mechanical systems. Technical result of innovation is creation of spectral set of multidimensional images which reflect time-correlated three-dimensional vector parameters of metrological, and\\or estimated, and\\or design parameters of oscillations in mechanical systems. Reconstructed images of different dimensionality integrated in various combinations depending on their objective function can be used as homeostatic profile or cybernetic image of oscillatory processes in mechanical systems for an objective estimation of current operational conditions in real time. The innovation can be widely used to enhance the efficiency of monitoring and research of oscillation processes in mechanical systems (objects) in construction, mechanical engineering, acoustics, etc. Concept method of vector vibrometry based on application of vector 3D phase- sensitive vibro-transducers permits unique evaluation of real stressed-strained states of power aggregates and loaded constructions and opens fundamental innovation opportunities: conduct of continuous (on-line regime) reliable monitoring of turboagregates of electrical machines, compressor installations, bases, supports, pipe-lines and other objects subjected to damaging effect of vibrations; control of operational safety of technical systems at all the stages of life cycle including design, test production, tuning, testing, operational use, repairs and resource enlargement; creation of vibro-diagnostic systems of authentic non-destructive control of anisotropic characteristics of materials resistance of power aggregates and loaded constructions under outer effects and operational flaws. The described technology is revolutionary, universal and common for all branches of engineering industry and construction building objects.

  7. 23 CFR 661.53 - What standards should be used for bridge design?

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 23 Highways 1 2011-04-01 2011-04-01 false What standards should be used for bridge design? 661.53... TRAFFIC OPERATIONS INDIAN RESERVATION ROAD BRIDGE PROGRAM § 661.53 What standards should be used for bridge design? (a) Replacement—A replacement structure must meet the current geometric, construction and...

  8. 33 CFR Appendix A to Part 154 - Guidelines for Detonation Flame Arresters

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... (CG-522). 1. Scope 1.1This standard provides the minimum requirements for design, construction.../Circ. 373/Rev. 1—Revised Standards for the Design, Testing and Locating of Devices to Prevent the... maximum design pressure drop for that maximum flow rate. 6.1.10Maximum operating pressure. 7. Materials 7...

  9. Nuclear Powerplant Safety: Design and Planning.

    ERIC Educational Resources Information Center

    Department of Energy, Washington, DC. Nuclear Energy Office.

    The most important concern in the design, construction and operation of nuclear powerplants is safety. Nuclear power is one of the major contributors to the nation's supply of electricity; therefore, it is important to assure its safe use. Each different type of powerplant has special design features and systems to protect health and safety. One…

  10. 23 CFR 661.53 - What standards should be used for bridge design?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 23 Highways 1 2010-04-01 2010-04-01 false What standards should be used for bridge design? 661.53... TRAFFIC OPERATIONS INDIAN RESERVATION ROAD BRIDGE PROGRAM § 661.53 What standards should be used for bridge design? (a) Replacement—A replacement structure must meet the current geometric, construction and...

  11. Establishment of Biosafety Level-3 (BSL-3) laboratory: Important criteria to consider while designing, constructing, commissioning & operating the facility in Indian setting

    PubMed Central

    Mourya, Devendra T.; Yadav, Pragya D.; Majumdar, Triparna Dutta; Chauhan, Devendra S.; Katoch, Vishwa Mohan

    2014-01-01

    Since the enactment of Environmental Protection Act in 1989 and Department of Biotechnology (DBT) guidelines to deal with genetically modified organisms, India has embarked on establishing various levels of biosafety laboratories to deal with highly infectious and pathogenic organisms. Occurrence of outbreaks due to rapidly spreading respiratory and haemorrhagic fever causing viruses has caused an urgency to create a safe laboratory environment. This has thus become a mandate, not only to protect laboratory workers, but also to protect the environment and community. In India, technology and science are progressing rapidly. Several BSL-3 [=high containment] laboratories are in the planning or execution phase, to tackle biosafety issues involved in handling highly infectious disease agents required for basic research and diagnosis. In most of the developing countries, the awareness about biocontainment has increased but planning, designing, constructing and operating BSL-3 laboratories need regular updates about the design and construction of facilities and clear definition of risk groups and their handling which should be in harmony with the latest international practices. This article describes the major steps involved in the process of construction of a BSL-3 laboratory in Indian settings, from freezing the concept of proposal to operationalization phase. The key to success of this kind of project is strong institutional commitment to biosafety norms, adequate fund availability, careful planning and designing, hiring good construction agency, monitoring by experienced consultancy agency and involvement of scientific and engineering personnel with biocontainment experience in the process. PMID:25297350

  12. Establishment of Biosafety Level-3 (BSL-3) laboratory: important criteria to consider while designing, constructing, commissioning & operating the facility in Indian setting.

    PubMed

    Mourya, Devendra T; Yadav, Pragya D; Majumdar, Triparna Dutta; Chauhan, Devendra S; Katoch, Vishwa Mohan

    2014-08-01

    Since the enactment of Environmental Protection Act in 1989 and Department of Biotechnology (DBT) guidelines to deal with genetically modified organisms, India has embarked on establishing various levels of biosafety laboratories to deal with highly infectious and pathogenic organisms. Occurrence of outbreaks due to rapidly spreading respiratory and haemorrhagic fever causing viruses has caused an urgency to create a safe laboratory environment. This has thus become a mandate, not only to protect laboratory workers, but also to protect the environment and community. In India, technology and science are progressing rapidly. Several BSL-3 [=high containment] laboratories are in the planning or execution phase, to tackle biosafety issues involved in handling highly infectious disease agents required for basic research and diagnosis. In most of the developing countries, the awareness about biocontainment has increased but planning, designing, constructing and operating BSL-3 laboratories need regular updates about the design and construction of facilities and clear definition of risk groups and their handling which should be in harmony with the latest international practices. This article describes the major steps involved in the process of construction of a BSL-3 laboratory in Indian settings, from freezing the concept of proposal to operationalization phase. The key to success of this kind of project is strong institutional commitment to biosafety norms, adequate fund availability, careful planning and designing, hiring good construction agency, monitoring by experienced consultancy agency and involvement of scientific and engineering personnel with biocontainment experience in the process.

  13. Peculiarities of organizing the construction of nuclear medicine facilities and the transportation of radionuclide

    NASA Astrophysics Data System (ADS)

    Telichenko, Valeriy; Malykha, Galina; Dorogan, Igor

    2017-10-01

    The article is devoted to the organization of construction of nuclear medicine facilities in Russia. The article describes the main methods of nuclear medical diagnostics, as well as the peculiarities of nuclear medicine facilities that determine the need for application of specific methods for organizing and managing the construction, methods of requirements management in the organization of construction of nuclear medicine facilities. Sustainable development of the transport of radioactive isotopes from the place of production to places of consumption is very important for the safety of the population. The requirements management system is an important and necessary component in organizing the construction of complex facilities, such as nuclear medicine facilities. The author developed and proposed a requirements management system for the design, construction and operation of a nuclear medicine facility, which provides for a cyclic sequence of actions. This system allows reducing the consumption of resources including material and energy during construction and operation of complex objects.

  14. 14 CFR 29.672 - Stability augmentation, automatic, and power-operated systems.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ..., DEPARTMENT OF TRANSPORTATION AIRCRAFT AIRWORTHINESS STANDARDS: TRANSPORT CATEGORY ROTORCRAFT Design and Construction Control Systems § 29.672 Stability augmentation, automatic, and power-operated systems. If the... unsafe condition if the pilot is unaware of the failure. Warning systems must not activate the control...

  15. 14 CFR 27.672 - Stability augmentation, automatic, and power-operated systems.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ..., DEPARTMENT OF TRANSPORTATION AIRCRAFT AIRWORTHINESS STANDARDS: NORMAL CATEGORY ROTORCRAFT Design and Construction Control Systems § 27.672 Stability augmentation, automatic, and power-operated systems. If the... unsafe condition if the pilot is unaware of the failure. Warning systems must not activate the control...

  16. 40 CFR 125.94 - How will requirements reflecting best technology available for minimizing adverse environmental...

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... in your facility's watershed in place of or as a supplement to installing design and control... construction, operational, maintenance, monitoring, and adaptive management requirements of a Technology..., and adaptive management requirements of your Technology Installation and Operation Plan during the...

  17. 40 CFR 125.94 - How will requirements reflecting best technology available for minimizing adverse environmental...

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... in your facility's watershed in place of or as a supplement to installing design and control... construction, operational, maintenance, monitoring, and adaptive management requirements of a Technology..., and adaptive management requirements of your Technology Installation and Operation Plan during the...

  18. 40 CFR 125.94 - How will requirements reflecting best technology available for minimizing adverse environmental...

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... in your facility's watershed in place of or as a supplement to installing design and control... construction, operational, maintenance, monitoring, and adaptive management requirements of a Technology..., and adaptive management requirements of your Technology Installation and Operation Plan during the...

  19. 40 CFR 125.94 - How will requirements reflecting best technology available for minimizing adverse environmental...

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... in your facility's watershed in place of or as a supplement to installing design and control... construction, operational, maintenance, monitoring, and adaptive management requirements of a Technology..., and adaptive management requirements of your Technology Installation and Operation Plan during the...

  20. The Dynairship. [structural design criteria and feasibility analysis of an airplane - airship

    NASA Technical Reports Server (NTRS)

    Miller, W. M., Jr.

    1975-01-01

    A feasibility analysis for the construction and use of a combination airplane-airship named 'Dynairship' is undertaken. Payload capacities, fuel consumption, and the structural design of the craft are discussed and compared to a conventional commercial aircraft (a Boeing 747). Cost estimates of construction and operation of the craft are also discussed. The various uses of the craft are examined (i.e, in police work, materials handling, and ocean surveillance), and aerodynamic configurations and photographs are shown.

  1. ISST (Intercontinental Ballistic Missile Silo Superhardening Technology) Structure with SIFCON (Slurry-Infiltrated Fiber Concrete) - HFC-2 Test

    DTIC Science & Technology

    1988-04-01

    Government-related pro- curement, the United States Government incurs no responsibility or any obli -j gation whatsoever. The fact that the Government...Arizona. NIIERI then began a program to deveiop a slurry mix design for use in the structure, as well as construction techniques for placing the SIFCON in...OBJECTIVES 3 II CONSTRUCTION AND FIELDING OPERATIONS 4 INTRODUCTION 4 I DEMONSTRATION PROGRAM 4 Introduct ion 4 Procedure 4 Results 7 $ DESIGN 7 I ntrod uc

  2. The results of a limited study of approaches to the design, fabrication, and testing of a dynamic model of the NASA IOC space station. Executive summary

    NASA Technical Reports Server (NTRS)

    Brooks, George W.

    1985-01-01

    The options for the design, construction, and testing of a dynamic model of the space station were evaluated. Since the definition of the space station structure is still evolving, the Initial Operating Capacity (IOC) reference configuration was used as the general guideline. The results of the studies treat: general considerations of the need for and use of a dynamic model; factors which deal with the model design and construction; and a proposed system for supporting the dynamic model in the planned Large Spacecraft Laboratory.

  3. IPAD II (Integrated Programs for Aerospace-Vehicle Design) Advances in Distributed Data Base Management for CAD/CAM (Computer-Aided Design and Manufacturing Technology). Proceedings of a National Symposium Held in Denver, Colorado, April 17-19, 1984.

    DTIC Science & Technology

    1984-01-01

    working drawings, lists, and miscellaneous information needed for construction and testing (fig. 4). Detail design and construction in- cludes...still in test and evaluation phases, and is currently operational on a CDC computer. Its approach to management of geometric data is a unique and...been to provide the high degree of engineering user flexibility and yet achieve acceptable response times. In late 1983, a test system which has user

  4. Zero Energy Schools: The Challenges

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Torcellini, Paul A

    School buildings have a lot of potential to achieve zero energy (ZE) in new construction as well as in retrofits. There are many examples of schools operating at ZE, and many technical resources available to guide school districts and their design and construction teams through the process. When school districts embark on the path to ZE, however, they often confront challenges related to processes and a perception that ZE buildings require 'new,' unconventional, and expensive technologies, materials, or equipment. Here are some of the challenges school districts and their design and construction teams commonly encounter, and the solutions they usemore » to overcome them.« less

  5. Magnetostatics Analysis, Design, and Construction of a Loudspeaker

    NASA Astrophysics Data System (ADS)

    Galeriu, Calin

    2010-11-01

    Making a loudspeaker is a very rewarding hands-on activity that can be used to teach about electro-magnetism and sound waves. Several loudspeaker designs have been described in this magazine.1-4 The simplest loudspeaker4 has only a magnet, a coil, and three plastic cups. The simpler devices3,4 require a powerful amplified output, e.g., from a boom box. The more complex devices1,2 can operate using the smaller electric current from a CD player earphone output. Unfortunately, the procedure to make a more efficient loudspeaker is lengthy and less recommended to some high school students, involving a hot glue gun, a safety razor, five-minute epoxy, etc. Our loudspeaker, a variation of Heller's,2 is both simple in construction and efficient in operation. An analysis of the magnetic field distribution helped us in the design of this loudspeaker.

  6. Design, construction and operation of a new filter approach for treatment of surface waters in Southeast Asia

    NASA Astrophysics Data System (ADS)

    Frankel, R. J.

    1981-05-01

    A simple, inexpensive, and efficient method of water treatment for rural communities in Southeast Asia was developed using local materials as filter media. The filter utilizes coconut fiber and burnt rice husks in a two-stage filtering process designed as a gravityfed system without the need for backwashing, and eliminates in most cases the need of any chemicals. The first-stage filter with coconut fiber acts essentially as a substitute for the coagulation and sedimentation phases of conventional water-treatment plants. The second-stage filter, using burnt rice husks, is similar to slow sand filtration with the additional benefits of taste, color and odor removals through the absorption properties of the activated carbon in the medium. This paper reports on the design, construction costs, and operating results of several village size units in Thailand and in the Philippines.

  7. Design, construction and test of RF solid state power amplifier for IRANCYC-10

    NASA Astrophysics Data System (ADS)

    Azizi, H.; Dehghan, M.; Abbasi Davani, F.; Ghasemi, F.

    2018-03-01

    In this paper, design, simulation and construction of a high power amplifier to provide the required power of a cyclotron accelerator (IRANCYC-10) is presented step-by-step. The Push-Pull designed amplifier can generate 750 W at the operating frequency of 71 MHz continous wave (CW). In this study, achieving the best efficiency of the amplifier, as well as reducing overall volume using baluns, were two important goals. The new offered water-cooled heat sink was used for cooling the amplifier which increases the operating life of the transistor. The gain and PAE of the SSPA were obtained 20 dB and 77.7%, respectively. The simulated and measured RF results are in good agreement with each other. The results show that, using an RF transformer in matching impedance of matching networks, it causes a smaller size and also a better amplifier performance.

  8. Deployable reflector design for Ku-band operation

    NASA Technical Reports Server (NTRS)

    Tankersley, B. C.

    1974-01-01

    A project was conducted to extend the deployable antenna technology state-of-the art through the design, analysis, construction, and testing of a lightweight, high surface tolerance, 12.5 foot diameter reflector for Ku-band operation. The applicability of the reflector design to the Tracking and Data Relay Satellite (TDRS) program was one requirement to be met. A documentary of the total program is presented. The performance requirements used to guide and constrain the design are discussed. The radio frequency, structural/dynamic, and thermal performance results are reported. Appendices are used to provide test data and detailed fabrication drawings of the reflector.

  9. Modular space station phase B extension preliminary performance specification. Volume 1: Initial station systems

    NASA Technical Reports Server (NTRS)

    1971-01-01

    The general, operational, design/construction, and subsystem design requirements are presented for a solar powered modular space station system. While these requirements apply only to the initial station system, the system is readily adaptable to a growth configuration.

  10. 43 CFR 3802.4-2 - Access.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... OF THE INTERIOR MINERALS MANAGEMENT (3000) MINING CLAIMS UNDER THE GENERAL MINING LAWS Exploration... specify the location of the access route, the design, construction, operation and maintenance standards...

  11. 43 CFR 3802.4-2 - Access.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... OF THE INTERIOR MINERALS MANAGEMENT (3000) MINING CLAIMS UNDER THE GENERAL MINING LAWS Exploration... specify the location of the access route, the design, construction, operation and maintenance standards...

  12. 14 CFR 31.49 - Control systems.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    .... (c) Each balloon using a captive gas as the lifting means must have an automatic valve or appendix... STANDARDS: MANNED FREE BALLOONS Design Construction § 31.49 Control systems. (a) Each control must operate... minute when the balloon is at its maximum operating pressure. (d) Each hot air balloon must have a means...

  13. 14 CFR 31.49 - Control systems.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    .... (c) Each balloon using a captive gas as the lifting means must have an automatic valve or appendix... STANDARDS: MANNED FREE BALLOONS Design Construction § 31.49 Control systems. (a) Each control must operate... minute when the balloon is at its maximum operating pressure. (d) Each hot air balloon must have a means...

  14. 14 CFR 31.49 - Control systems.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    .... (c) Each balloon using a captive gas as the lifting means must have an automatic valve or appendix... STANDARDS: MANNED FREE BALLOONS Design Construction § 31.49 Control systems. (a) Each control must operate... minute when the balloon is at its maximum operating pressure. (d) Each hot air balloon must have a means...

  15. 14 CFR 31.49 - Control systems.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    .... (c) Each balloon using a captive gas as the lifting means must have an automatic valve or appendix... STANDARDS: MANNED FREE BALLOONS Design Construction § 31.49 Control systems. (a) Each control must operate... minute when the balloon is at its maximum operating pressure. (d) Each hot air balloon must have a means...

  16. 40 CFR 412.26 - Pretreatment standards for new sources (PSNS).

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ...) EFFLUENT GUIDELINES AND STANDARDS CONCENTRATED ANIMAL FEEDING OPERATIONS (CAFO) POINT SOURCE CATEGORY Ducks § 412.26 Pretreatment standards for new sources (PSNS). (a) Except as provided in 40 CFR 403.7 and in... events cause an overflow of process wastewater from a facility designed, constructed, operated, and...

  17. 14 CFR 25.672 - Stability augmentation and automatic and power-operated systems.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ..., DEPARTMENT OF TRANSPORTATION AIRCRAFT AIRWORTHINESS STANDARDS: TRANSPORT CATEGORY AIRPLANES Design and Construction Control Systems § 25.672 Stability augmentation and automatic and power-operated systems. If the... the pilot were not aware of the failure. Warning systems must not activate the control systems. (b...

  18. 14 CFR 25.672 - Stability augmentation and automatic and power-operated systems.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ..., DEPARTMENT OF TRANSPORTATION AIRCRAFT AIRWORTHINESS STANDARDS: TRANSPORT CATEGORY AIRPLANES Design and Construction Control Systems § 25.672 Stability augmentation and automatic and power-operated systems. If the... the pilot were not aware of the failure. Warning systems must not activate the control systems. (b...

  19. 14 CFR 25.672 - Stability augmentation and automatic and power-operated systems.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ..., DEPARTMENT OF TRANSPORTATION AIRCRAFT AIRWORTHINESS STANDARDS: TRANSPORT CATEGORY AIRPLANES Design and Construction Control Systems § 25.672 Stability augmentation and automatic and power-operated systems. If the... the pilot were not aware of the failure. Warning systems must not activate the control systems. (b...

  20. 14 CFR 25.672 - Stability augmentation and automatic and power-operated systems.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ..., DEPARTMENT OF TRANSPORTATION AIRCRAFT AIRWORTHINESS STANDARDS: TRANSPORT CATEGORY AIRPLANES Design and Construction Control Systems § 25.672 Stability augmentation and automatic and power-operated systems. If the... the pilot were not aware of the failure. Warning systems must not activate the control systems. (b...

  1. Photovoltaic system criteria documents. Volume 5: Safety criteria for photovoltaic applications

    NASA Technical Reports Server (NTRS)

    Koenig, John C.; Billitti, Joseph W.; Tallon, John M.

    1979-01-01

    Methodology is described for determining potential safety hazards involved in the construction and operation of photovoltaic power systems and provides guidelines for the implementation of safety considerations in the specification, design and operation of photovoltaic systems. Safety verification procedures for use in solar photovoltaic systems are established.

  2. 40 CFR 418.13 - Effluent limitations and guidelines representing the degree of effluent reduction attained by the...

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... (CONTINUED) EFFLUENT GUIDELINES AND STANDARDS FERTILIZER MANUFACTURING POINT SOURCE CATEGORY Phosphate... calcium sulfate storage pile runoff facility operated separately or in combination with a water recirculation system designed, constructed and operated to maintain a surge capacity equal to the runoff from...

  3. 40 CFR 418.13 - Effluent limitations and guidelines representing the degree of effluent reduction attained by the...

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... (CONTINUED) EFFLUENT GUIDELINES AND STANDARDS FERTILIZER MANUFACTURING POINT SOURCE CATEGORY Phosphate... calcium sulfate storage pile runoff facility operated separately or in combination with a water recirculation system designed, constructed and operated to maintain a surge capacity equal to the runoff from...

  4. 40 CFR 418.13 - Effluent limitations and guidelines representing the degree of effluent reduction attained by the...

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... (CONTINUED) EFFLUENT GUIDELINES AND STANDARDS FERTILIZER MANUFACTURING POINT SOURCE CATEGORY Phosphate... calcium sulfate storage pile runoff facility operated separately or in combination with a water recirculation system designed, constructed and operated to maintain a surge capacity equal to the runoff from...

  5. Glass Fiber Reinforced Metal Pressure Vessel Design Guide

    NASA Technical Reports Server (NTRS)

    Landes, R. E.

    1972-01-01

    The Engineering Guide presents curves and general equations for safelife design of lightweight glass fiber reinforced (GFR) metal pressure vessels operating under anticipated Space Shuttle service conditions. The high composite vessel weight efficiency is shown to be relatively insensitive to shape, providing increased flexibility to designers establishing spacecraft configurations. Spheres, oblate speroids, and cylinders constructed of GFR Inconel X-750, 2219-T62 aluminum, and cryoformed 301 stainless steel are covered; design parameters and performance efficiencies for each configuration are compared at ambient and cryogenic temperature for an operating pressure range of 690 to 2760 N/sq cm (1000 to 4000 psi). Design variables are presented as a function of metal shell operating to sizing (proof) stress ratios for use with fracture mechanics data generated under a separate task of this program.

  6. A Sketching Interface for Freeform 3D Modeling

    NASA Astrophysics Data System (ADS)

    Igarashi, Takeo

    This chapter introduces Teddy, a sketch-based modeling system to quickly and easily design freeform models such as stuffed animals and other rotund objects. The user draws several 2D freeform strokes interactively on the screen and the system automatically constructs plausible 3D polygonal surfaces. Our system supports several modeling operations, including the operation to construct a 3D polygonal surface from a 2D silhouette drawn by the user: it inflates the region surrounded by the silhouette making a wide area fat, and a narrow area thin. Teddy, our prototype system, is implemented as a Java program, and the mesh construction is done in real-time on a standard PC. Our informal user study showed that a first-time user masters the operations within 10 minutes, and can construct interesting 3D models within minutes. We also report the result of a case study where a high school teacher taught various 3D concepts in geography using the system.

  7. Design, construction, operation and costs of a modern small-scale fuel-alcohol plant

    NASA Astrophysics Data System (ADS)

    Leeper, S. A.; Dawley, L. J.; Wolfram, J. H.; Berglund, G. R.; Richardson, J. G.; McAtee, R. E.

    1982-01-01

    The design used for the small-scale fuel alcohol plant (SSFAP) is discussed. By incorporating a microprocessor into the plant design, most plant operations were automated and labor requirements were reduced. Continuous processing made energy conservation possible, thus reducing energy requirements. A low-temperature, continuous plug-flow cooker design made high yields possible. Ethanol was consistently produced at the SSFAP from corn at a yield of 2.6 gallons (anhydrous) per bushel and an energy requirement of 30,000 to 35,000 Btu/gallon (190-proof). In addition, barley, grain dust, and potato waste were converted at the SSFAP. The capacity of the SSFAP is 180,000 gallons per year (300 days operation). Competitively priced ethanol is produced at this capacity.

  8. 24. AERIAL VIEW LOOKING SOUTHEAST AT BUILDING 371 UNDER CONSTRUCTION ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    24. AERIAL VIEW LOOKING SOUTHEAST AT BUILDING 371 UNDER CONSTRUCTION IN 1974. BY 1968, BUILDING 771 WAS OUTMODED AND NEW TECHNOLOGIES HAD BEEN DEVELOPED FOR PLUTONIUM RECOVERY. AS A RESULT, A NEW RECOVERY BUILDING, BUILDING 371 WAS PLANNED. BUILDING 371 SUFFERED FROM VARIOUS DESIGN PROBLEMS, WHICH PREVENTED ITS OPENING UNTIL 1981 AND CAUSED TERMINATION OF RECOVERY OPERATIONS IN 1986. IT NEVER BECAME FULLY OPERATIONAL. TO THE EAST OF BUILDING 371, IS THE 700 BUILDING COMPLEX (4/74). - Rocky Flats Plant, Bounded by Indiana Street & Routes 93, 128 & 72, Golden, Jefferson County, CO

  9. Lessons Learned about Liquid Metal Reactors from FFTF Experience

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Wootan, David W.; Casella, Andrew M.; Omberg, Ronald P.

    2016-09-20

    The Fast Flux Test Facility (FFTF) is the most recent liquid-metal reactor (LMR) to operate in the United States, from 1982 to 1992. FFTF is located on the DOE Hanford Site near Richland, Washington. The 400-MWt sodium-cooled, low-pressure, high-temperature, fast-neutron flux, nuclear fission test reactor was designed specifically to irradiate Liquid Metal Fast Breeder Reactor (LMFBR) fuel and components in prototypical temperature and flux conditions. FFTF played a key role in LMFBR development and testing activities. The reactor provided extensive capability for in-core irradiation testing, including eight core positions that could be used with independent instrumentation for the test specimens.more » In addition to irradiation testing capabilities, FFTF provided long-term testing and evaluation of plant components and systems for LMFBRs. The FFTF was highly successful and demonstrated outstanding performance during its nearly 10 years of operation. The technology employed in designing and constructing this reactor, as well as information obtained from tests conducted during its operation, can significantly influence the development of new advanced reactor designs in the areas of plant system and component design, component fabrication, fuel design and performance, prototype testing, site construction, and reactor operations. The FFTF complex included the reactor, as well as equipment and structures for heat removal, containment, core component handling and examination, instrumentation and control, and for supplying utilities and other essential services. The FFTF Plant was designed using a “system” concept. All drawings, specifications and other engineering documentation were organized by these systems. Efforts have been made to preserve important lessons learned during the nearly 10 years of reactor operation. A brief summary of Lessons Learned in the following areas will be discussed: Acceptance and Startup Testing of FFTF FFTF Cycle Reports« less

  10. MAN-004 Design Standards Manual

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Peterson, Timothy L.

    2014-07-01

    At Sandia National Laboratories in New Mexico (SNL/NM), the design, construction, operation, and maintenance of facilities is guided by industry standards, a graded approach, and the systematic analysis of life cycle benefits received for costs incurred. The design of the physical plant must ensure that the facilities are "fit for use," and provide conditions that effectively, efficiently, and safely support current and future mission needs. In addition, SNL/NM applies sustainable design principles, using an integrated whole-building design approach, from site planning to facility design, construction, and operation to ensure building resource efficiency and the health and productivity of occupants. Themore » safety and health of the workforce and the public, any possible effects on the environment, and compliance with building codes take precedence over project issues, such as performance, cost, and schedule. These design standards generally apply to all disciplines on all SNL/NM projects. Architectural and engineering design must be both functional and cost-effective. Facility design must be tailored to fit its intended function, while emphasizing low-maintenance, energy-efficient, and energy-conscious design. Design facilities that can be maintained easily, with readily accessible equipment areas, low maintenance, and quality systems. To promote an orderly and efficient appearance, architectural features of new facilities must complement and enhance the existing architecture at the site. As an Architectural and Engineering (A/E) professional, you must advise the Project Manager when this approach is prohibitively expensive. You are encouraged to use professional judgment and ingenuity to produce a coordinated interdisciplinary design that is cost-effective, easily contractible or buildable, high-performing, aesthetically pleasing, and compliant with applicable building codes. Close coordination and development of civil, landscape, structural, architectural, fire protection, mechanical, electrical, telecommunications, and security features is expected to ensure compatibility with planned functional equipment and to facilitate constructability. If portions of the design are subcontracted to specialists, delivery of the finished design documents must not be considered complete until the subcontracted portions are also submitted for review. You must, along with support consultants, perform functional analyses and programming in developing design solutions. These solutions must reflect coordination of the competing functional, budgetary, and physical requirements for the project. During design phases, meetings between you and the SNL/NM Project Team to discuss and resolve design issues are required. These meetings are a normal part of the design process. For specific design-review requirements, see the project-specific Design Criteria. In addition to the design requirements described in this manual, instructive information is provided to explain the sustainable building practice goals for design, construction, operation, and maintenance of SNL/NM facilities. Please notify SNL/NM personnel of design best practices not included in this manual, so they can be incorporated in future updates.« less

  11. The Construction And Instrumentation Of A Pilot Treatment System At The Standard Mine Superfund Site, Crested Butte, CO

    EPA Science Inventory

    A pilot biochemical reactor (BCR) was designed and constructed to treat mine-influenced water emanating from an adit at a remote site in southern Colorado which receives an average of 400 inches (10.2 meters) of snowfall each season. The objective of the study is to operate and ...

  12. The Construction And Instrumentation Of A Pilot Treatment System At The Standard Mine Superfund Site, Crested Butte, CO - (Presentation)

    EPA Science Inventory

    A pilot biochemical reactor (BCR) was designed and constructed to treat mine-influenced water emanating from an adit at a remote site in southern Colorado which receives an average of 400 inches (10.2 meters) of snowfall each season. The objective of the study is to operate and ...

  13. AUTOMOTIVE DIESEL MAINTENANCE 1. UNIT XXIX, REVIEWING THE CONSTRUCTION OF ENGINE COMPONENTS.

    ERIC Educational Resources Information Center

    Human Engineering Inst., Cleveland, OH.

    THIS MODULE OF A 30-MODULE COURSE IS DESIGNED TO PROVIDE A REVIEW OF THE CONSTRUCTION AND OPERATION OF DIESEL ENGINE COMPONENTS. TOPICS ARE STATIONARY PARTS, ENGINE MOVING PARTS, PISTON RINGS, AND CONNECTING RODS AND PISTON PINS. THE MODULE CONSISTS OF AN INSTRUCTOR'S GUIDE, TRANSPARENCIES, A LIST OF SUGGESTED SUPPLEMENTARY MATERIALS, AND TRAINEE…

  14. Theory, construction and operation of simple tensiometers.

    USGS Publications Warehouse

    Stannard, D.I.

    1986-01-01

    The tensiometer presented here in detail is suited to diverse on-site applications. Constructed from readily available, inexpensive parts, it can measure as much as 0.85 bar of tension. Design features include a flushing system for removal of entrapped air or mercury, and an easily maintained modular network of nylon manometers and water-supply tubes. -from Author

  15. 10 CFR 2.402 - Separate hearings on separate issues; consolidation of proceedings.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... appendix N of part 50 of this chapter for construction permits for nuclear power reactors of a type... Licenses To Construct and/or Operate Nuclear Power Plants of Identical Design at Multiple Sites § 2.402... proceedings. 2.402 Section 2.402 Energy NUCLEAR REGULATORY COMMISSION RULES OF PRACTICE FOR DOMESTIC LICENSING...

  16. The Design of Secondary Schools--A Case Study, Singapore.

    ERIC Educational Resources Information Center

    Liew Kok-Pun, Michael; And Others

    Land scarcity dominates the thinking of school planners in Singapore. Techniques for optimizing the use of land for schools include (1) the construction of multi-storied or high-rise schools; (2) operation of a double-shift system and, in some cases, a triple-shift system; (3) multiple use of educational spaces; and (4) construction of several…

  17. Ontology for Life-Cycle Modeling of Electrical Distribution Systems: Model View Definition

    DTIC Science & Technology

    2013-06-01

    building information models ( BIM ) at the coordinated design stage of building construction. 1.3 Approach To...standard for exchanging Building Information Modeling ( BIM ) data, which defines hundreds of classes for common use in software, currently supported by...specifications, Construction Operations Building in- formation exchange (COBie), Building Information Modeling ( BIM ) 16. SECURITY CLASSIFICATION OF:

  18. 40 CFR 264.302 - Action leakage rate.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... design (e.g., slope, hydraulic conductivity, thickness of drainage material), construction, operation... and creep of synthetic components of the system, overburden pressures, etc.). (b) To determine if the...

  19. 40 CFR 264.302 - Action leakage rate.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... design (e.g., slope, hydraulic conductivity, thickness of drainage material), construction, operation... and creep of synthetic components of the system, overburden pressures, etc.). (b) To determine if the...

  20. 40 CFR 264.302 - Action leakage rate.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... design (e.g., slope, hydraulic conductivity, thickness of drainage material), construction, operation... and creep of synthetic components of the system, overburden pressures, etc.). (b) To determine if the...

  1. 40 CFR 264.302 - Action leakage rate.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... design (e.g., slope, hydraulic conductivity, thickness of drainage material), construction, operation... and creep of synthetic components of the system, overburden pressures, etc.). (b) To determine if the...

  2. 49 CFR 1520.3 - Terms used in this part.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Statistics. Federal Flight Deck Officer means a pilot participating in the Federal Flight Deck Officer... conception, planning, design, construction, operation, or decommissioning phase. A vulnerability assessment...

  3. 49 CFR 1520.3 - Terms used in this part.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... Statistics. Federal Flight Deck Officer means a pilot participating in the Federal Flight Deck Officer... conception, planning, design, construction, operation, or decommissioning phase. A vulnerability assessment...

  4. 49 CFR 1520.3 - Terms used in this part.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... Statistics. Federal Flight Deck Officer means a pilot participating in the Federal Flight Deck Officer... conception, planning, design, construction, operation, or decommissioning phase. A vulnerability assessment...

  5. 49 CFR 1520.3 - Terms used in this part.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Statistics. Federal Flight Deck Officer means a pilot participating in the Federal Flight Deck Officer... conception, planning, design, construction, operation, or decommissioning phase. A vulnerability assessment...

  6. 49 CFR 1520.3 - Terms used in this part.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... Statistics. Federal Flight Deck Officer means a pilot participating in the Federal Flight Deck Officer... conception, planning, design, construction, operation, or decommissioning phase. A vulnerability assessment...

  7. Southeast geysers effluent pipeline project. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Dellinger, M.

    1998-01-15

    The project concept originated in 1990 with the convergence of two problems: (1) a need for augmented injection to mitigate declining reservoir productivity at the Geysers; and (2) a need for a new method of wastewater disposal for Lake County communities near the The Geysers. A public/private partnership of Geysers operators and the Lake County Sanitation District (LACOSAN) was formed in 1991 to conduct a series of engineering, environmental, and financing studies of transporting treated wastewater effluent from the communities to the southeast portion of The Geysers via a 29-mile pipeline. By 1994, these evaluations concluded that the concept wasmore » feasible and the stakeholders proceeded to formally develop the project, including pipeline and associated facilities design; preparation of an environmental impact statement; negotiation of construction and operating agreements; and assembly of $45 million in construction funding from the stakeholders, and from state and federal agencies with related program goals. The project development process culminated in the system`s dedication on October 16, 1997. As of this writing, all project components have been constructed or installed, successfully tested in compliance with design specifications, and are operating satisfactorily.« less

  8. Preliminary study for a numerical aerodynamic simulation facility. Phase 1: Extension

    NASA Technical Reports Server (NTRS)

    Lincoln, N. R.

    1978-01-01

    Functional requirements and preliminary design data were identified for use in the design of all system components and in the construction of a facility to perform aerodynamic simulation for airframe design. A skeleton structure of specifications for the flow model processor and monitor, the operating system, and the language and its compiler is presented.

  9. DESIGN GUIDELINES FOR GOOD HEARING CONDITIONS AND EFFECTIVE NOISE CONTROL IN SCHOOL CLASSROOMS.

    ERIC Educational Resources Information Center

    KINGSBURY, H.F.; TAYLOR, D.W.

    TWO OF THE MOST IMPORTANT OPERATIVE DESIGN FACTORS GOVERNING SPEECH PERCEPTION IN CLASSROOMS HAVE BEEN EXAMINED AND GUIDELINES IN THE FORM OF GRAPHS, ETC. CONSTRUCTED THAT SHOULD BE UNDERSTANDABLE TO AND USABLE BY THOSE ASSOCIATED WITH SCHOOL PLANNING AND DESIGN. THE TWO FACTORS CONSIDERED ARE--(1) PROVISION FOR OPTIMUM REVERBERATION TIME, AND (2)…

  10. 40 CFR 52.1488 - Visibility protection.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... substituting equivalent or superior control technology, provided such technology meets applicable emission... operator shall meet the following deadlines for design and construction of the emission control equipment... binding contract to design the SO2, opacity and NOX control systems for Unit 1 and Unit 2 by March 1, 2003...

  11. 40 CFR 52.1488 - Visibility protection.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... substituting equivalent or superior control technology, provided such technology meets applicable emission... operator shall meet the following deadlines for design and construction of the emission control equipment... binding contract to design the SO2, opacity and NOX control systems for Unit 1 and Unit 2 by March 1, 2003...

  12. 40 CFR 52.1488 - Visibility protection.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... substituting equivalent or superior control technology, provided such technology meets applicable emission... operator shall meet the following deadlines for design and construction of the emission control equipment... binding contract to design the SO2, opacity and NOX control systems for Unit 1 and Unit 2 by March 1, 2003...

  13. 40 CFR 52.1488 - Visibility protection.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... substituting equivalent or superior control technology, provided such technology meets applicable emission... operator shall meet the following deadlines for design and construction of the emission control equipment... binding contract to design the SO2, opacity and NOX control systems for Unit 1 and Unit 2 by March 1, 2003...

  14. ONSITE WASTEWATER TREATMENT AND DISPOSAL SYSTEMS (1980 EDITION) AND ONSITE WASTEWATER TREATMENT SYSTEMS MANUAL (2002 EDITION)

    EPA Science Inventory

    The U.S. Environmental Protection Agency (USEPA) first issued detailed guidance on the design, construction, and operation of onsite wastewater treatment systems (OWTSs) in 1980. Design Manual: Onsite Wastewater Treatment and Disposal Systems (USEPA.1980) was the most comprehens...

  15. Model tests of wind turbine with a vertical axis of rotation type Lenz 2

    NASA Astrophysics Data System (ADS)

    Zwierzchowski, Jaroslaw; Laski, Pawel Andrzej; Blasiak, Slawomir; Takosoglu, Jakub Emanuel; Pietrala, Dawid Sebastian; Bracha, Gabriel Filip; Nowakowski, Lukasz

    A building design of vertical axis wind turbines (VAWT) was presented in the article. The construction and operating principle of a wind turbine were described therein. Two VAWT turbine models were compared, i.a. Darrieus and Lenz2, taking their strengths and weaknesses into consideration. 3D solid models of turbine components were presented with the use of SolidWorks software. Using CFD methods, the air flow on two aerodynamic fins, symmetrical and asymmetrical, at different angles of attack were tested. On the basis of flow simulation conducted in FlowSimulation, an asymmetrical fin was chosen as the one showing greater load bearing capacities. Due to the uncertainty of trouble-free operation of Darrieus turbine on construction elements creating the basis thereof, a 3D model of Lenz2 turbine was constructed, which is more reliable and makes turbine self-start possible. On the basis of the research, components were designed and technical docu mentation was compiled.

  16. Cairo consensus on the IVF laboratory environment and air quality: report of an expert meeting.

    PubMed

    Mortimer, D; Cohen, J; Mortimer, S T; Fawzy, M; McCulloh, D H; Morbeck, D E; Pollet-Villard, X; Mansour, R T; Brison, D R; Doshi, A; Harper, J C; Swain, J E; Gilligan, A V

    2018-03-02

    This proceedings report presents the outcomes from an international Expert Meeting to establish a consensus on the recommended technical and operational requirements for air quality within modern assisted reproduction technology (ART) laboratories. Topics considered included design and construction of the facility, as well as its heating, ventilation and air conditioning system; control of particulates, micro-organisms (bacteria, fungi and viruses) and volatile organic compounds (VOCs) within critical areas; safe cleaning practices; operational practices to optimize air quality while minimizing physicochemical risks to gametes and embryos (temperature control versus air flow); and appropriate infection-control practices that minimize exposure to VOC. More than 50 consensus points were established under the general headings of assessing site suitability, basic design criteria for new construction, and laboratory commissioning and ongoing VOC management. These consensus points should be considered as aspirational benchmarks for existing ART laboratories, and as guidelines for the construction of new ART laboratories. Copyright © 2018 The Authors. Published by Elsevier Ltd.. All rights reserved.

  17. Design and operation of small biogas plants

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Abdel-Dayem, A.M.; Hamad, M.A.

    1980-12-01

    This paper concentrates on the experience gained from the adaptation of the Chinese biogas technology to rural areas of Egypt. Three different prototype digesters have been constructed. The first is a 10 M/sup 3/ rectangular digester of the water pressure type, the second is a 6 M/sup 3/ circular and shallow digester with domed roof and dished bottom. The third prototype unit with a capacity of 7 M/sup 3/ has been recently constructed. It combines the features of both plug flow and the Indian movable cap types. Provisions for solar heating of feed water, composting of effluent and attachments tomore » both latrine and animal shed were incorporated in the unit. The structural theory, design criteria, construction technique and cost estimation of the circular digester are described. Some operation and performance data of the circular digester are presented. This covers the effects of variation of ambient temperature on internal temperature, effects of temperature and pressure on the gas production rate and composition.« less

  18. Sandia National Laboratories Facilities Management and Operations Center Design Standards Manual

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Peterson, Timothy L.

    2014-09-01

    At Sandia National Laboratories in New Mexico (SNL/NM), the design, construction, operation, and maintenance of facilities is guided by industry standards, a graded approach, and the systematic analysis of life cycle benefits received for costs incurred. The design of the physical plant must ensure that the facilities are "fit for use," and provide conditions that effectively, efficiently, and safely support current and future mission needs. In addition, SNL/NM applies sustainable design principles, using an integrated whole-building design approach, from site planning to facility design, construction, and operation to ensure building resource efficiency and the health and productivity of occupants. Themore » safety and health of the workforce and the public, any possible effects on the environment, and compliance with building codes take precedence over project issues, such as performance, cost, and schedule. These design standards generally apply to all disciplines on all SNL/NM projects. Architectural and engineering design must be both functional and cost-effective. Facility design must be tailored to fit its intended function, while emphasizing low-maintenance, energy-efficient, and energy-conscious design. Design facilities that can be maintained easily, with readily accessible equipment areas, low maintenance, and quality systems. To promote an orderly and efficient appearance, architectural features of new facilities must complement and enhance the existing architecture at the site. As an Architectural and Engineering (A/E) professional, you must advise the Project Manager when this approach is prohibitively expensive. You are encouraged to use professional judgment and ingenuity to produce a coordinated interdisciplinary design that is cost-effective, easily contractible or buildable, high-performing, aesthetically pleasing, and compliant with applicable building codes. Close coordination and development of civil, landscape, structural, architectural, fire protection, mechanical, electrical, telecommunications, and security features is expected to ensure compatibility with planned functional equipment and to facilitate constructability. If portions of the design are subcontracted to specialists, delivery of the finished design documents must not be considered complete until the subcontracted portions are also submitted for review. You must, along with support consultants, perform functional analyses and programming in developing design solutions. These solutions must reflect coordination of the competing functional, budgetary, and physical requirements for the project. During design phases, meetings between you and the SNL/NM Project Team to discuss and resolve design issues are required. These meetings are a normal part of the design process. For specific design-review requirements, see the project-specific Design Criteria. In addition to the design requirements described in this manual, instructive information is provided to explain the sustainable building practice goals for design, construction, operation, and maintenance of SNL/NM facilities. Please notify SNL/NM personnel of design best practices not included in this manual, so they can be incorporated in future updates. You must convey all documents describing work to the SNL/NM Project Manager in both hard copy and in an electronic format compatible with the SNL/NM-prescribed CADD and other software packages, and in accordance with a SNL/NM approved standard format. Print all hard copy versions of submitted documents (excluding drawings and renderings) double-sided when practical.« less

  19. Groundwater contamination from waste management sites: The interaction between risk-based engineering design and regulatory policy: 2. Results

    NASA Astrophysics Data System (ADS)

    Massmann, Joel; Freeze, R. Allan

    1987-02-01

    The risk-cost-benefit analysis developed in the companion paper (J. Massmann and R. A. Freeze, this issue) is here applied to (1) an assessment of the relative worth of containment-construction activities, site-exploration activities, and monitoring activities as components of a design strategy for the owner/operator of a waste management facility; (2) an assessment of alternative policy options available to a regulatory agency; and (3) a case history. Sensitivity analyses designed to address the first issue show that the allocation of resources by the owner/operator is sensitive to the stochastic parameters used to describe the hydraulic conductivity field at a site. For the cases analyzed, the installation of a dense monitoring network is of less value to the owner/operator than a more conservative containment design. Sensitivity analyses designed to address the second issue suggest that from a regulatory perspective, design standards should be more effective than performance standards in reducing risk, and design specifications on the containment structure should be more effective than those on the monitoring network. Performance bonds posted before construction have a greater potential to influence design than prospective penalties to be imposed at the time of failure. Siting on low-conductivity deposits is a more effective method of risk reduction than any form of regulatory influence. Results of the case history indicate that the methodology can be successfully applied at field sites.

  20. A Spherically-Shaped PZT Thin Film Ultrasonic Transducer with an Acoustic Impedance Gradient Matching Layer Based on a Micromachined Periodically Structured Flexible Substrate

    PubMed Central

    Feng, Guo-Hua; Liu, Wei-Fan

    2013-01-01

    This paper presents the microfabrication of an acoustic impedance gradient matching layer on a spherically-shaped piezoelectric ultrasonic transducer. The acoustic matching layer can be designed to achieve higher acoustic energy transmission and operating bandwidth. Also included in this paper are a theoretical analysis of the device design and a micromachining technique to produce the novel transducer. Based on a design of a lead titanium zirconium (PZT) micropillar array, the constructed gradient acoustic matching layer has much better acoustic transmission efficiency within a 20–50 MHz operation range compared to a matching layer with a conventional quarter-wavelength thickness Parylene deposition. To construct the transducer, periodic microcavities are built on a flexible copper sheet, and then the sheet forms a designed curvature with a ball shaping. After PZT slurry deposition, the constructed PZT micropillar array is released onto a curved thin PZT layer. Following Parylene conformal coating on the processed PZT micropillars, the PZT micropillars and the surrounding Parylene comprise a matching layer with gradient acoustic impedance. By using the proposed technique, the fabricated transducer achieves a center frequency of 26 MHz and a −6 dB bandwidth of approximately 65%. PMID:24113683

  1. Safeguards-by-Design:Guidance for High Temperature Gas Reactors (HTGRs) With Prismatic Fuel

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Mark Schanfein; Casey Durst

    2012-11-01

    Introduction and Purpose The following is a guidance document from a series prepared for the U.S. Department of Energy (DOE) National Nuclear Security Administration (NNSA), under the Next Generation Safeguards Initiative (NGSI), to assist facility designers and operators in implementing international Safeguards-by-Design (SBD). SBD has two main objectives: (1) to avoid costly and time consuming redesign work or retrofits of new nuclear fuel cycle facilities and (2) to make the implementation of international safeguards more effective and efficient at such facilities. In the long term, the attainment of these goals would save industry and the International Atomic Energy Agency (IAEA)more » time, money, and resources and be mutually beneficial. This particular safeguards guidance document focuses on prismatic fuel high temperature gas reactors (HTGR). The purpose of the IAEA safeguards system is to provide credible assurance to the international community that nuclear material and other specified items are not diverted from peaceful nuclear uses. The safeguards system consists of the IAEA’s statutory authority to establish safeguards; safeguards rights and obligations in safeguards agreements and additional protocols; and technical measures implemented pursuant to those agreements. Of foremost importance is the international safeguards agreement between the country and the IAEA, concluded pursuant to the Treaty on the Non-Proliferation of Nuclear Weapons (NPT). According to a 1992 IAEA Board of Governors decision, countries must: notify the IAEA of a decision to construct a new nuclear facility as soon as such decision is taken; provide design information on such facilities as the designs develop; and provide detailed design information based on construction plans at least 180 days prior to the start of construction, and on "as-built" designs at least 180 days before the first receipt of nuclear material. Ultimately, the design information will be captured in an IAEA Design Information Questionnaire (DIQ), prepared by the facility operator, typically with the support of the facility designer. The IAEA will verify design information over the life of the project. This design information is an important IAEA safeguards tool. Since the main interlocutor with the IAEA in each country is the State Regulatory Authority/SSAC (or Regional Regulatory Authority, e.g. EURATOM), the responsibility for conveying this design information to the IAEA falls to the State Regulatory Authority/SSAC. For the nuclear industry to reap the benefits of SBD (i.e. avoid cost overruns and construction schedule slippages), nuclear facility designers and operators should work closely with the State Regulatory Authority and IAEA as soon as a decision is taken to build a new nuclear facility. Ideally, this interaction should begin during the conceptual design phase and continue throughout construction and start-up of a nuclear facility. Such early coordination and planning could influence decisions on the design of the nuclear material processing flow-sheet, material storage and handling arrangements, and facility layout (including safeguards equipment), etc.« less

  2. 25 CFR 170.402 - What is the tribal role in transportation planning?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... RESERVATION ROADS PROGRAM Planning, Design, and Construction of Indian Reservation Roads Program Facilities... transportation related meetings; (9) Performing transportation planning for operational and maintenance...

  3. 49 CFR 15.3 - Terms used in this part.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    .... Federal Flight Deck Officer means a pilot participating in the Federal Flight Deck Officer Program under... interference, whether during the conception, planning, design, construction, operation, or decommissioning...

  4. 49 CFR 15.3 - Terms used in this part.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    .... Federal Flight Deck Officer means a pilot participating in the Federal Flight Deck Officer Program under... interference, whether during the conception, planning, design, construction, operation, or decommissioning...

  5. 49 CFR 15.3 - Terms used in this part.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    .... Federal Flight Deck Officer means a pilot participating in the Federal Flight Deck Officer Program under... interference, whether during the conception, planning, design, construction, operation, or decommissioning...

  6. 49 CFR 15.3 - Terms used in this part.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    .... Federal Flight Deck Officer means a pilot participating in the Federal Flight Deck Officer Program under... interference, whether during the conception, planning, design, construction, operation, or decommissioning...

  7. 49 CFR 15.3 - Terms used in this part.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    .... Federal Flight Deck Officer means a pilot participating in the Federal Flight Deck Officer Program under... interference, whether during the conception, planning, design, construction, operation, or decommissioning...

  8. Pydna: a simulation and documentation tool for DNA assembly strategies using python.

    PubMed

    Pereira, Filipa; Azevedo, Flávio; Carvalho, Ângela; Ribeiro, Gabriela F; Budde, Mark W; Johansson, Björn

    2015-05-02

    Recent advances in synthetic biology have provided tools to efficiently construct complex DNA molecules which are an important part of many molecular biology and biotechnology projects. The planning of such constructs has traditionally been done manually using a DNA sequence editor which becomes error-prone as scale and complexity of the construction increase. A human-readable formal description of cloning and assembly strategies, which also allows for automatic computer simulation and verification, would therefore be a valuable tool. We have developed pydna, an extensible, free and open source Python library for simulating basic molecular biology DNA unit operations such as restriction digestion, ligation, PCR, primer design, Gibson assembly and homologous recombination. A cloning strategy expressed as a pydna script provides a description that is complete, unambiguous and stable. Execution of the script automatically yields the sequence of the final molecule(s) and that of any intermediate constructs. Pydna has been designed to be understandable for biologists with limited programming skills by providing interfaces that are semantically similar to the description of molecular biology unit operations found in literature. Pydna simplifies both the planning and sharing of cloning strategies and is especially useful for complex or combinatorial DNA molecule construction. An important difference compared to existing tools with similar goals is the use of Python instead of a specifically constructed language, providing a simulation environment that is more flexible and extensible by the user.

  9. Automated Construction of Node Software Using Attributes in a Ubiquitous Sensor Network Environment

    PubMed Central

    Lee, Woojin; Kim, Juil; Kang, JangMook

    2010-01-01

    In sensor networks, nodes must often operate in a demanding environment facing restrictions such as restricted computing resources, unreliable wireless communication and power shortages. Such factors make the development of ubiquitous sensor network (USN) applications challenging. To help developers construct a large amount of node software for sensor network applications easily and rapidly, this paper proposes an approach to the automated construction of node software for USN applications using attributes. In the proposed technique, application construction proceeds by first developing a model for the sensor network and then designing node software by setting the values of the predefined attributes. After that, the sensor network model and the design of node software are verified. The final source codes of the node software are automatically generated from the sensor network model. We illustrate the efficiency of the proposed technique by using a gas/light monitoring application through a case study of a Gas and Light Monitoring System based on the Nano-Qplus operating system. We evaluate the technique using a quantitative metric—the memory size of execution code for node software. Using the proposed approach, developers are able to easily construct sensor network applications and rapidly generate a large number of node softwares at a time in a ubiquitous sensor network environment. PMID:22163678

  10. Automated construction of node software using attributes in a ubiquitous sensor network environment.

    PubMed

    Lee, Woojin; Kim, Juil; Kang, JangMook

    2010-01-01

    In sensor networks, nodes must often operate in a demanding environment facing restrictions such as restricted computing resources, unreliable wireless communication and power shortages. Such factors make the development of ubiquitous sensor network (USN) applications challenging. To help developers construct a large amount of node software for sensor network applications easily and rapidly, this paper proposes an approach to the automated construction of node software for USN applications using attributes. In the proposed technique, application construction proceeds by first developing a model for the sensor network and then designing node software by setting the values of the predefined attributes. After that, the sensor network model and the design of node software are verified. The final source codes of the node software are automatically generated from the sensor network model. We illustrate the efficiency of the proposed technique by using a gas/light monitoring application through a case study of a Gas and Light Monitoring System based on the Nano-Qplus operating system. We evaluate the technique using a quantitative metric-the memory size of execution code for node software. Using the proposed approach, developers are able to easily construct sensor network applications and rapidly generate a large number of node softwares at a time in a ubiquitous sensor network environment.

  11. Proximity operations considerations affecting spacecraft design

    NASA Technical Reports Server (NTRS)

    Staas, Steven K.

    1991-01-01

    Experience from several recent spacecraft development programs, such as Space Station Freedom (SSF) and the Orbital Maneuvering Vehicle (OMV) has shown the need for factoring proximity operations considerations into the vehicle design process. Proximity operations, those orbital maneuvers and procedures which involve operation of two or more spacecraft at ranges of less than one nautical mile, are essential to the construction, servicing, and operation of complex spacecraft. Typical proximity operations considerations which drive spacecraft design may be broken into two broad categories; flight profile characteristics and concerns, and use of various spacecraft systems during proximity operations. Proximity operations flight profile concerns include the following: (1) relative approach/separation line; (2) relative orientation of the vehicles; (3) relative translational and rotational rates; (4) vehicle interaction, in the form of thruster plume impingement, mating or demating operations, or uncontrolled contact/collision; and (5) active vehicle piloting. Spacecraft systems used during proximity operations include the following: (1) sensors, such as radar, laser ranging devices, or optical ranging systems; (2) effector hardware, such as thrusters; (3) flight control software; and (4) mating hardware, needed for docking or berthing operations. A discussion of how these factors affect vehicle design follows, addressing both active and passive/cooperative vehicles.

  12. The Road to a Green District

    ERIC Educational Resources Information Center

    Gutter, Rachel; Knupp, Emily

    2011-01-01

    Green design, green construction, and green operations for new buildings are rapidly becoming the norm for school districts throughout the country. Today, increased availability of green products and technology coupled with cost savings that are realized through an integrated design process mean that schools like Arabia Mountain High School in…

  13. The Road to a Green District

    ERIC Educational Resources Information Center

    Gutter, Rachel; Knupp, Emily

    2010-01-01

    Green design, green construction and green operations for new buildings are rapidly becoming the norm for school districts throughout the country. Today, increased availability of green products and technology coupled with cost savings that are realized through an integrated design process mean that schools like Arabia Mountain High School can be…

  14. 23 CFR 970.212 - Federal lands safety management system (SMS).

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... planning, design, construction, maintenance, and operations. (c) The SMS shall be designed to fit the NPS... for the collection, maintenance and reporting of a data base that includes: (i) Accident records with... standards) for low volume roads may be tailored to be consistent with the functional classification of the...

  15. 40 CFR 270.19 - Specific part B information requirements for incinerators.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ...) Nozzle and burner design. (ix) Construction materials. (x) Location and description of temperature... burn data are provided. (4) The design and operating conditions of the incinerator unit to be used, compared with that for which comparative burn data are available. (5) A description of the results...

  16. 40 CFR 270.19 - Specific part B information requirements for incinerators.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ...) Nozzle and burner design. (ix) Construction materials. (x) Location and description of temperature... burn data are provided. (4) The design and operating conditions of the incinerator unit to be used, compared with that for which comparative burn data are available. (5) A description of the results...

  17. 40 CFR 270.19 - Specific part B information requirements for incinerators.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ...) Nozzle and burner design. (ix) Construction materials. (x) Location and description of temperature... burn data are provided. (4) The design and operating conditions of the incinerator unit to be used, compared with that for which comparative burn data are available. (5) A description of the results...

  18. 40 CFR 270.19 - Specific part B information requirements for incinerators.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ...) Nozzle and burner design. (ix) Construction materials. (x) Location and description of temperature... burn data are provided. (4) The design and operating conditions of the incinerator unit to be used, compared with that for which comparative burn data are available. (5) A description of the results...

  19. 40 CFR 270.19 - Specific part B information requirements for incinerators.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ...) Nozzle and burner design. (ix) Construction materials. (x) Location and description of temperature... burn data are provided. (4) The design and operating conditions of the incinerator unit to be used, compared with that for which comparative burn data are available. (5) A description of the results...

  20. A pilot scale electrical infrared dry-peeling system for tomatoes: design and performance evaluation

    USDA-ARS?s Scientific Manuscript database

    A pilot scale infrared dry-peeling system for tomatoes was designed and constructed. The system consisted of three major sections including the IR heating, vacuum, and pinch roller sections. The peeling performance of the system was examined under different operational conditions using tomatoes with...

  1. 40 CFR 35.2050 - Effect of approval or certification of documents.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... OTHER FEDERAL ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works § 35.2050 Effect of approval or certification of documents. Review or approval of facilities plans, design drawings... relieve the grantee of its responsibility to properly plan, design, build and effectively operate and...

  2. 75 FR 33357 - Agency Information Collection Activities: Submission for the Office of Management and Budget (OMB...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-11

    ... or asked to report: Licensees and applicants for nuclear power plants and research and test... detailed review of applications for licenses and amendments thereto to construct and operate nuclear power plants, preliminary or final design approvals, design certifications, research and test facilities...

  3. 14 CFR 33.17 - Fire protection.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 1 2010-01-01 2010-01-01 false Fire protection. 33.17 Section 33.17... STANDARDS: AIRCRAFT ENGINES Design and Construction; General § 33.17 Fire protection. (a) The design and... fire during normal operation and failure conditions, and must minimize the effect of such a fire. In...

  4. 40 CFR 62.14353 - Standards for municipal solid waste landfill emissions.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 8 2010-07-01 2010-07-01 false Standards for municipal solid waste... POLLUTANTS Federal Plan Requirements for Municipal Solid Waste Landfills That Commenced Construction Prior to... municipal solid waste landfill emissions. (a) The owner or operator of a designated facility having a design...

  5. 40 CFR 62.14353 - Standards for municipal solid waste landfill emissions.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 8 2011-07-01 2011-07-01 false Standards for municipal solid waste... POLLUTANTS Federal Plan Requirements for Municipal Solid Waste Landfills That Commenced Construction Prior to... municipal solid waste landfill emissions. (a) The owner or operator of a designated facility having a design...

  6. 40 CFR 62.14353 - Standards for municipal solid waste landfill emissions.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... POLLUTANTS Federal Plan Requirements for Municipal Solid Waste Landfills That Commenced Construction Prior to... 40 Protection of Environment 9 2013-07-01 2013-07-01 false Standards for municipal solid waste... municipal solid waste landfill emissions. (a) The owner or operator of a designated facility having a design...

  7. 47 CFR 73.754 - Frequency monitors.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... station shall operate a frequency monitor at the transmitter independent of the frequency control of the transmitter. (b) The frequency monitor shall be designed and constructed in accordance with good engineering...

  8. 23 CFR 650.207 - Plans, specifications and estimates.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... OPERATIONS BRIDGES, STRUCTURES, AND HYDRAULICS Erosion and Sediment Control on Highway Construction Projects... highway project designs for the control of erosion and sedimentation and the protection of water quality...

  9. 23 CFR 650.207 - Plans, specifications and estimates.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... OPERATIONS BRIDGES, STRUCTURES, AND HYDRAULICS Erosion and Sediment Control on Highway Construction Projects... highway project designs for the control of erosion and sedimentation and the protection of water quality...

  10. 23 CFR 650.207 - Plans, specifications and estimates.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... OPERATIONS BRIDGES, STRUCTURES, AND HYDRAULICS Erosion and Sediment Control on Highway Construction Projects... highway project designs for the control of erosion and sedimentation and the protection of water quality...

  11. 23 CFR 650.207 - Plans, specifications and estimates.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... OPERATIONS BRIDGES, STRUCTURES, AND HYDRAULICS Erosion and Sediment Control on Highway Construction Projects... highway project designs for the control of erosion and sedimentation and the protection of water quality...

  12. 23 CFR 650.207 - Plans, specifications and estimates.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... OPERATIONS BRIDGES, STRUCTURES, AND HYDRAULICS Erosion and Sediment Control on Highway Construction Projects... highway project designs for the control of erosion and sedimentation and the protection of water quality...

  13. The American nuclear construction craftsmen: Will we be ready to build again

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bravo, R.

    1990-01-01

    The present state of nuclear plant maintenance and operations support reflects sexual, ethnic, and radical integration; continued educational advances; some computer literacy; mixed trades in maintenance; detailed training for maintenance and operations work in the operating plant; plant safety awareness and respect; need for top-quality, take the time to do it right mentality; and planning. With no new nuclear construction, what will be the specific talents, focus, and contributions that the craftsmen can be expected to bring to the project To be prepared to successfully manage the next generation of nuclear plant construction, the industry must be acutely aware ofmore » the needs of the labor pool. To be aware of the needs requires an intimate knowledge of the present state of the craft talent, the changed expectations of their contributions, and the effects of new technologies, materials, methods, and individuals that will be used to design and build.« less

  14. On the independence of compliance and reliance: are automation false alarms worse than misses?

    PubMed

    Dixon, Stephen R; Wickens, Christopher D; McCarley, Jason S

    2007-08-01

    Participants performed a tracking task and system monitoring task while aided by diagnostic automation. The goal of the study was to examine operator compliance and reliance as affected by automation failures and to clarify claims regarding independence of these two constructs. Background data revealed a trend toward nonindependence of the compliance-reliance constructs. Thirty-two undergraduate students performed the simulation that presented the visual display while dependent measures were collected. False alarm-prone automation hurt overall performance more than miss-prone automation. False alarm-prone automation also clearly affected both operator compliance and reliance, whereas miss-prone automation appeared to affect only operator reliance. Compliance and reliance do not appear to be entirely independent of each other. False alarms appear to be more damaging to overall performance than misses, and designers must take the compliance-reliance constructs into consideration.

  15. 14 CFR 31.49 - Control systems.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... minute when the balloon is at its maximum operating pressure. (d) Each hot air balloon must have a means to allow the controlled release of hot air during flight. (e) Each hot air balloon must have a means... STANDARDS: MANNED FREE BALLOONS Design Construction § 31.49 Control systems. (a) Each control must operate...

  16. Maintaining Sustainability for Green Schools

    ERIC Educational Resources Information Center

    Kennedy, Mike

    2011-01-01

    The promise of sustainably designed school facilities is that they will operate more efficiently and last longer than buildings constructed in more traditional ways. But that promise comes with a big if. The payoff is delivered only if the facility managers operate and maintain the buildings in ways that adhere to sustainable strategies called for…

  17. Educational Trends Shaping School Planning, Design, Construction, Funding and Operation

    ERIC Educational Resources Information Center

    Stevenson, Kenneth R.

    2010-01-01

    What does the future hold for educators and facilities professionals when it comes to planning, building, funding, and operating school facilities? No one can absolutely know beforehand. However, there are many, many indicators of where public education in the United States may well be destined. These indicators take the form of already occurring…

  18. Informal Numeracy Skills: The Structure and Relations among Numbering, Relations, and Arithmetic Operations in Preschool

    ERIC Educational Resources Information Center

    Purpura, David J.; Lonigan, Christopher J.

    2013-01-01

    Validating the structure of informal numeracy skills is critical to understanding the developmental trajectories of mathematics skills at early ages; however, little research has been devoted to construct evaluation of the Numbering, Relations, and Arithmetic Operations domains. This study was designed to address this knowledge gap by examining…

  19. 40 CFR 418.17 - Effluent limitations guidelines representing the degree of effluent reduction attainable by the...

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... (CONTINUED) EFFLUENT GUIDELINES AND STANDARDS FERTILIZER MANUFACTURING POINT SOURCE CATEGORY Phosphate... pile runoff facility operated separately or in combination with a water recirculation system designed, constructed and operated to maintain a surge capacity equal to the runoff from the 25-year, 24-hour rainfall...

  20. 40 CFR 418.17 - Effluent limitations quidelines representing the degree of effluent reduction attainable by the...

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... (CONTINUED) EFFLUENT GUIDELINES AND STANDARDS FERTILIZER MANUFACTURING POINT SOURCE CATEGORY Phosphate... pile runoff facility operated separately or in combination with a water recirculation system designed, constructed and operated to maintain a surge capacity equal to the runoff from the 25-year, 24-hour rainfall...

Top