Sample records for detailed implementation plan

  1. Design requirements for SRB production control system. Volume 4: Implementation

    NASA Technical Reports Server (NTRS)

    1981-01-01

    The implementation plan which is presented was developed to provide the means for the successful implementation of the automated production control system. There are three factors which the implementation plan encompasses: detailed planning; phased implementation; and user involvement. The plan is detailed to the task level in terms of necessary activities as the system is developed, refined, installed, and tested. These tasks are scheduled, on a preliminary basis, over a two-and-one-half-year time frame.

  2. ISS Payload Operations: The Need for and Benefit of Responsive Planning

    NASA Technical Reports Server (NTRS)

    Nahay, Ed; Boster, Mandee

    2000-01-01

    International Space Station (ISS) payload operations are controlled through implementation of a payload operations plan. This plan, which represents the defined approach to payload operations in general, can vary in terms of level of definition. The detailed plan provides the specific sequence and timing of each component of a payload's operations. Such an approach to planning was implemented in the Spacelab program. The responsive plan provides a flexible approach to payload operations through generalization. A responsive approach to planning was implemented in the NASA/Mir Phase 1 program, and was identified as a need during the Skylab program. The current approach to ISS payload operations planning and control tends toward detailed planning, rather than responsive planning. The use of detailed plans provides for the efficient use of limited resources onboard the ISS. It restricts flexibility in payload operations, which is inconsistent with the dynamic nature of the ISS science program, and it restricts crew desires for flexibility and autonomy. Also, detailed planning is manpower intensive. The development and implementation of a responsive plan provides for a more dynamic, more accommodating, and less manpower intensive approach to planning. The science program becomes more dynamic and responsive as the plan provides flexibility to accommodate real-time science accomplishments. Communications limitations and the crew desire for flexibility and autonomy in plan implementation are readily accommodated with responsive planning. Manpower efficiencies are accomplished through a reduction in requirements collection and coordination, plan development, and maintenance. Through examples and assessments, this paper identifies the need to transition from detailed to responsive plans for ISS payload operations. Examples depict specific characteristics of the plans. Assessments identify the following: the means by which responsive plans accommodate the dynamic nature of science programs and the crew desire for flexibility; the means by which responsive plans readily accommodate ISS communications constraints; manpower efficiencies to be achieved through use of responsive plans; and the implications of responsive planning relative to resource utilization efficiency.

  3. PC-based Multiple Information System Interface (PC/MISI) detailed design and implementation plan

    NASA Technical Reports Server (NTRS)

    Dominick, Wayne D. (Editor); Hall, Philip P.

    1985-01-01

    The design plan for the personal computer multiple information system interface (PC/MISI) project is discussed. The document is intended to be used as a blueprint for the implementation of the system. Each component is described in the detail necessary to allow programmers to implement the system. A description of the system data flow and system file structures is given.

  4. Setting Strategic Directions Using Critical Success Factors.

    ERIC Educational Resources Information Center

    Bourne, Bonnie; Gates, Larry; Cofer, James

    2000-01-01

    Describes implementation of a system-level planning model focused on institutional improvement and effectiveness at the University of Missouri. Details implementation of three phases of the strategic planning model (strategic analysis, strategic thinking/decision-making, and campus outreach/systems administration planning); identifies critical…

  5. 40 CFR 51.116 - Data availability.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... FOR PREPARATION, ADOPTION, AND SUBMITTAL OF IMPLEMENTATION PLANS Control Strategy § 51.116 Data availability. (a) The State must retain all detailed data and calculations used in the preparation of each plan... Administrator at his request. (b) The detailed data and calculations used in the preparation of plan revisions...

  6. 40 CFR 51.116 - Data availability.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... FOR PREPARATION, ADOPTION, AND SUBMITTAL OF IMPLEMENTATION PLANS Control Strategy § 51.116 Data availability. (a) The State must retain all detailed data and calculations used in the preparation of each plan... Administrator at his request. (b) The detailed data and calculations used in the preparation of plan revisions...

  7. SEPARATIONS AND WASTE FORMS CAMPAIGN IMPLEMENTATION PLAN

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Vienna, John D.; Todd, Terry A.; Peterson, Mary E.

    2012-11-26

    This Separations and Waste Forms Campaign Implementation Plan provides summary level detail describing how the Campaign will achieve the objectives set-forth by the Fuel Cycle Reasearch and Development (FCRD) Program. This implementation plan will be maintained as a living document and will be updated as needed in response to changes or progress in separations and waste forms research and the FCRD Program priorities.

  8. Discharge Planning in Acute Care Hospitals in Israel: Services Planned and Levels of Implementation and Adequacy

    ERIC Educational Resources Information Center

    Auslander, Gail K.; Soskolne, Varda; Stanger, Varda; Ben-Shahar, Ilana; Kaplan, Giora

    2008-01-01

    This study aimed to examine the implementation, adequacy, and outcomes of discharge planning. The authors carried out a prospective study of 1,426 adult patients discharged from 11 acute care hospitals in Israel. Social workers provided detailed discharge plans on each patient. Telephone interviews were conducted two weeks post-discharge. Findings…

  9. 23 CFR 1200.25 - Improvement plan.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... Implementation and Management of the Highway Safety Program § 1200.25 Improvement plan. If a review of the Annual... improvement plan. This plan will detail strategies, program activities, and funding targets to meet the...

  10. Creating a High-Touch Recruitment Event: Utilizing Faculty to Recruit and Yield Students

    ERIC Educational Resources Information Center

    Freed, Lindsey R.; Howell, Leanne L.

    2018-01-01

    The following article describes the planning and implementation of a university student recruitment event that produced a high (new) student yield. Detailed descriptions of how staff and faculty worked together to plan and implement this event are described.

  11. Implementing Governance for a New Era: An Action Plan for Higher Education Trustees

    ERIC Educational Resources Information Center

    American Council of Trustees and Alumni, 2014

    2014-01-01

    "Implementing Governance for a New Era" is an action plan to assist college and university trustees in reforming higher education. Delivered to more than 16,000 college and university trustees in November 2014, the plan provides details on how trustees properly represent the public by ensuring students receive a quality education at a…

  12. Cloud computing strategic framework (FY13 - FY15).

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Arellano, Lawrence R.; Arroyo, Steven C.; Giese, Gerald J.

    This document presents an architectural framework (plan) and roadmap for the implementation of a robust Cloud Computing capability at Sandia National Laboratories. It is intended to be a living document and serve as the basis for detailed implementation plans, project proposals and strategic investment requests.

  13. 40 CFR 209.9 - Contents of a remedial plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... by the remedial order, including the category and/or configuration if applicable, and the make, model year and model number, if applicable. (2) A detailed description of the present location of the... the respondent. (5) A detailed account of the costs of implementing each of the proposed plans. (b...

  14. Maintaining consistency between planning hierarchies: Techniques and applications

    NASA Technical Reports Server (NTRS)

    Zoch, David R.

    1987-01-01

    In many planning and scheduling environments, it is desirable to be able to view and manipulate plans at different levels of abstraction, allowing the users the option of viewing and manipulating either a very detailed representation of the plan or a high-level more abstract version of the plan. Generating a detailed plan from a more abstract plan requires domain-specific planning/scheduling knowledge; the reverse process of generating a high-level plan from a detailed plan Reverse Plan Maintenance, or RPM) requires having the system remember the actions it took based on its domain-specific knowledge and its reasons for taking those actions. This reverse plan maintenance process is described as implemented in a specific planning and scheduling tool, The Mission Operations Planning Assistant (MOPA), as well as the applications of RPM to other planning and scheduling problems; emphasizing the knowledge that is needed to maintain the correspondence between the different hierarchical planning levels.

  15. Strategic implementation plan

    NASA Technical Reports Server (NTRS)

    1989-01-01

    The Life Science Division of the NASA Office of Space Science and Applications (OSSA) describes its plans for assuring the health, safety, and productivity of astronauts in space, and its plans for acquiring further fundamental scientific knowledge concerning space life sciences. This strategic implementation plan details OSSA's goals, objectives, and planned initiatives. The following areas of interest are identified: operational medicine; biomedical research; space biology; exobiology; biospheric research; controlled ecological life support; flight programs and advance technology development; the life sciences educational program; and earth benefits from space life sciences.

  16. Planning and Design: A Systems Approach.

    ERIC Educational Resources Information Center

    Bozeman, William C.; Clements, Mary A.

    1981-01-01

    Explains "purpose design," a planning and problem-solving strategy involving determination of planning purposes, generation and selection of solutions, specification of solution details, implementation, and evaluation. Describes the application of purpose design to the planning of an alumni association at Black Hawk College, a community…

  17. High performance computing and communications: FY 1997 implementation plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1996-12-01

    The High Performance Computing and Communications (HPCC) Program was formally authorized by passage, with bipartisan support, of the High-Performance Computing Act of 1991, signed on December 9, 1991. The original Program, in which eight Federal agencies participated, has now grown to twelve agencies. This Plan provides a detailed description of the agencies` FY 1996 HPCC accomplishments and FY 1997 HPCC plans. Section 3 of this Plan provides an overview of the HPCC Program. Section 4 contains more detailed definitions of the Program Component Areas, with an emphasis on the overall directions and milestones planned for each PCA. Appendix A providesmore » a detailed look at HPCC Program activities within each agency.« less

  18. Planning and Implementing Social Service Information Systems: A Guide for Management and Users. Human Services Monograph Series Number 25. Project Share.

    ERIC Educational Resources Information Center

    Cotter, Barbara

    Intended to aid administrators and users of social services in establishing information systems, this comprehensive guide to the design of such systems identifies the elements, effective strategies, and potential pitfalls involved in their planning, implementation, and utilization. Detailed discussions of management strategies for system…

  19. Implementation of Head Start Planned Variation: 1970-1971. Part II.

    ERIC Educational Resources Information Center

    Lukas, Carol Van Deusen; Wohlleb, Cynthia

    This volume of appendices is Part II of a study of program implementation in 12 models of Head Start Planned Variation. It presents details of the data analysis, copies of data collection instruments, and additional analyses and statistics. The appendices are: (A) Analysis of Variance Designs, (B) Copies of Instruments, (C) Additional Analyses,…

  20. An implementation plan for priorities in solar-system space physics

    NASA Technical Reports Server (NTRS)

    Krimigis, Stamatios M.; Athay, R. Grant; Baker, Daniel; Fisk, Lennard A.; Fredricks, Robert W.; Harvey, John W.; Jokipii, Jack R.; Kivelson, Margaret; Mendillo, Michael; Nagy, Andrew F.

    1985-01-01

    The scientific objectives and implementation plans and priorities of the Space Science Board in areas of solar physics, heliospheric physics, magnetospheric physics, upper atmosphere physics, solar-terrestrial coupling, and comparative planetary studies are discussed and recommended programs are summarized. Accomplishments of Skylab, Solar Maximum Mission, Nimbus-7, and 11 other programs are highlighted. Detailed mission plans in areas of solar and heliospheric physics, plasma physics, and upper atmospheric physics are also described.

  1. Implementation plans included in World Health Organisation guidelines.

    PubMed

    Wang, Zhicheng; Norris, Susan L; Bero, Lisa

    2016-05-20

    The implementation of high-quality guidelines is essential to improve clinical practice and public health. The World Health Organisation (WHO) develops evidence-based public health and other guidelines that are used or adapted by countries around the world. Detailed implementation plans are often necessary for local policymakers to properly use the guidelines developed by WHO. This paper describes the plans for guideline implementation reported in WHO guidelines and indicates which of these plans are evidence-based. We conducted a content analysis of the implementation sections of WHO guidelines approved by the WHO guideline review committee between December 2007 and May 2015. The implementation techniques reported in each guideline were coded according to the Cochrane Collaboration's Effective Practice and Organisation of Care (EPOC) taxonomy and classified as passive, active or policy strategies. The frequencies of implementation techniques are reported. The WHO guidelines (n = 123) analysed mentioned implementation techniques 800 times, although most mentioned implementation techniques very briefly, if at all. Passive strategies (21 %, 167/800) and general policy strategies (62 %, 496/800) occurred most often. Evidence-based active implementation methods were generally neglected with no guideline mentioning reminders (computerised or paper) and only one mentioning a multifaceted approach. Many guidelines contained implementation sections that were identical to those used in older guidelines produced by the same WHO technical unit. The prevalence of passive and policy-based implementation techniques as opposed to evidence-based active techniques suggests that WHO guidelines should contain stronger guidance for implementation. This could include structured and increased detail on implementation considerations, accompanying or linked documents that provide information on what is needed to contextualise or adapt a guideline and specific options from among evidence-based implementation strategies.

  2. 75 FR 39493 - United States Patent and Trademark Office Draft Strategic Plan for FY 2010-2015

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-09

    ... plan includes the USPTO's mission statement, vision statement and a description of the strategic goals... achieve its vision. Full details on how the USPTO plans to implement the strategic plan, including funding...] United States Patent and Trademark Office Draft Strategic Plan for FY 2010-2015 AGENCY: United States...

  3. Eastern Washington Intermodal Transportation Study Scope of Work

    DOT National Transportation Integrated Search

    1993-02-04

    This document presents a detailed Scope of Work to guide implementation of : the Eastern Washington Intermodal Transportation Study. Included is a : description of project management and staff responsibilities, a detailed work : plan and timetable fo...

  4. GIS-assisted spatial analysis for urban regulatory detailed planning: designer's dimension in the Chinese code system

    NASA Astrophysics Data System (ADS)

    Yu, Yang; Zeng, Zheng

    2009-10-01

    By discussing the causes behind the high amendments ratio in the implementation of urban regulatory detailed plans in China despite its law-ensured status, the study aims to reconcile conflict between the legal authority of regulatory detailed planning and the insufficient scientific support in its decision-making and compilation by introducing into the process spatial analysis based on GIS technology and 3D modeling thus present a more scientific and flexible approach to regulatory detailed planning in China. The study first points out that the current compilation process of urban regulatory detailed plan in China employs mainly an empirical approach which renders it constantly subjected to amendments; the study then discusses the need and current utilization of GIS in the Chinese system and proposes the framework of a GIS-assisted 3D spatial analysis process from the designer's perspective which can be regarded as an alternating processes between the descriptive codes and physical design in the compilation of regulatory detailed planning. With a case study of the processes and results from the application of the framework, the paper concludes that the proposed framework can be an effective instrument which provides more rationality, flexibility and thus more efficiency to the compilation and decision-making process of urban regulatory detailed plan in China.

  5. Ohio hospital PR pros collaborate on crisis communications plan.

    PubMed

    Rees, Tom

    2002-01-01

    Two member hospitals of the Akron Regional Hospital Association (ARHA), Ohio, experienced crisis situations which severely strained their public relations resources. These events were the genesis for the development of a comprehensive plan for sharing public relations resources among 11 member hospitals. The plan details procedures for sharing help in the event of a crisis or specific hospital media event. It identifies three potential situations in which it can be implemented: internal disaster, external disaster, or a specific incident unique to one of the hospitals. No occasion has yet arisen to implement the plan.

  6. 29 CFR 1926.705 - Requirements for lift-slab construction operations.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... operations shall be designed and planned by a registered professional engineer who has experience in lift-slab construction. Such plans and designs shall be implemented by the employer and shall include detailed instructions and sketches indicating the prescribed method of erection. These plans and designs...

  7. 29 CFR 1926.705 - Requirements for lift-slab construction operations.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... operations shall be designed and planned by a registered professional engineer who has experience in lift-slab construction. Such plans and designs shall be implemented by the employer and shall include detailed instructions and sketches indicating the prescribed method of erection. These plans and designs...

  8. 29 CFR 1926.705 - Requirements for lift-slab construction operations.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... operations shall be designed and planned by a registered professional engineer who has experience in lift-slab construction. Such plans and designs shall be implemented by the employer and shall include detailed instructions and sketches indicating the prescribed method of erection. These plans and designs...

  9. 29 CFR 1926.705 - Requirements for lift-slab construction operations.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... operations shall be designed and planned by a registered professional engineer who has experience in lift-slab construction. Such plans and designs shall be implemented by the employer and shall include detailed instructions and sketches indicating the prescribed method of erection. These plans and designs...

  10. 29 CFR 1926.705 - Requirements for lift-slab construction operations.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... operations shall be designed and planned by a registered professional engineer who has experience in lift-slab construction. Such plans and designs shall be implemented by the employer and shall include detailed instructions and sketches indicating the prescribed method of erection. These plans and designs...

  11. Use of theory to plan or evaluate guideline implementation among physicians: a scoping review.

    PubMed

    Liang, Laurel; Bernhardsson, Susanne; Vernooij, Robin W M; Armstrong, Melissa J; Bussières, André; Brouwers, Melissa C; Gagliardi, Anna R

    2017-02-27

    Guidelines support health care decision-making and high quality care and outcomes. However, their implementation is sub-optimal. Theory-informed, tailored implementation is associated with guideline use. Few guideline implementation studies published up to 1998 employed theory. This study aimed to describe if and how theory is now used to plan or evaluate guideline implementation among physicians. A scoping review was conducted. MEDLINE, EMBASE, and The Cochrane Library were searched from 2006 to April 2016. English language studies that planned or evaluated guideline implementation targeted to physicians based on explicitly named theory were eligible. Screening and data extraction were done in duplicate. Study characteristics and details about theory use were analyzed. A total of 1244 published reports were identified, 891 were unique, and 716 were excluded based on title and abstract. Among 175 full-text articles, 89 planned or evaluated guideline implementation targeted to physicians; 42 (47.2%) were based on theory and included. The number of studies using theory increased yearly and represented a wide array of countries, guideline topics and types of physicians. The Theory of Planned Behavior (38.1%) and the Theoretical Domains Framework (23.8%) were used most frequently. Many studies rationalized choice of theory (83.3%), most often by stating that the theory described implementation or its determinants, but most failed to explicitly link barriers with theoretical constructs. The majority of studies used theory to inform surveys or interviews that identified barriers of guideline use as a preliminary step in implementation planning (76.2%). All studies that evaluated interventions reported positive impact on reported physician or patient outcomes. While the use of theory to design or evaluate interventions appears to be increasing over time, this review found that one half of guideline implementation studies were based on theory and many of those provided scant details about how theory was used. This limits interpretation and replication of those interventions, and seems to result in multifaceted interventions, which may not be feasible outside of scientific investigation. Further research is needed to better understand how to employ theory in guideline implementation planning or evaluation.

  12. [Integration of the radiotherapy irradiation planning in the digital workflow].

    PubMed

    Röhner, F; Schmucker, M; Henne, K; Momm, F; Bruggmoser, G; Grosu, A-L; Frommhold, H; Heinemann, F E

    2013-02-01

    At the Clinic of Radiotherapy at the University Hospital Freiburg, all relevant workflow is paperless. After implementing the Operating Schedule System (OSS) as a framework, all processes are being implemented into the departmental system MOSAIQ. Designing a digital workflow for radiotherapy irradiation planning is a large challenge, it requires interdisciplinary expertise and therefore the interfaces between the professions also have to be interdisciplinary. For every single step of radiotherapy irradiation planning, distinct responsibilities have to be defined and documented. All aspects of digital storage, backup and long-term availability of data were considered and have already been realized during the OSS project. After an analysis of the complete workflow and the statutory requirements, a detailed project plan was designed. In an interdisciplinary workgroup, problems were discussed and a detailed flowchart was developed. The new functionalities were implemented in a testing environment by the Clinical and Administrative IT Department (CAI). After extensive tests they were integrated into the new modular department system. The Clinic of Radiotherapy succeeded in realizing a completely digital workflow for radiotherapy irradiation planning. During the testing phase, our digital workflow was examined and afterwards was approved by the responsible authority.

  13. NAGC Pre-K-Grade 12 Gifted Education Programming Standards: A Guide to Planning and Implementing High-Quality Services

    ERIC Educational Resources Information Center

    Johnsen, Susan K., Ed.

    2012-01-01

    The new Pre-K-Grade 12 Gifted Education Programming Standards should be part of every school district's repertoire of standards to ensure that the learning needs of advanced students are being met. "NAGC Pre-K-Grade 12 Gifted Education Programming Standards: A Guide to Planning and Implementing High-Quality Services" details six standards that…

  14. Entrepreneurial Spirit in Strategic Planning.

    ERIC Educational Resources Information Center

    Riggs, Donald E.

    1987-01-01

    Presents a model which merges the concepts of entrepreneurship with those of strategic planning to create a library management system. Each step of the process, including needs assessment and policy formation, strategy choice and implementation, and evaluation, is described in detail. (CLB)

  15. Promoting public health through state cancer control plans: a review of capacity and sustainability.

    PubMed

    Ory, Marcia G; Sanner, Brigid; Vollmer Dahlke, Deborah; Melvin, Cathy L

    2015-01-01

    The Centers for Disease Prevention and Control's National Comprehensive Cancer Control (CCC) Program oversee CCC programs designed to develop and implement CCC plans via CCC coalitions, alliances, or consortia of program stakeholders. We reviewed 40 up-to-date plans for states and the District of Columbia in order to assess how capacity building and sustainability, two evidence-based practices necessary for organizational readiness, positive growth, and maintenance are addressed. We employed an electronic key word search, supplemented by full text reviews of each plan to complete a content analysis of the CCC plans. Capacity is explicitly addressed in just over half of the plans (53%), generally from a conceptual point of view, with few specifics as to how capacity will be developed or enhanced. Roles and responsibilities, timelines for action, and measurements for evaluation of capacity building are infrequently mentioned. Almost all (92%) of the 40 up-to-date plans address sustainability on at least a cursory level, through efforts aimed at funding or seeking funding, policy initiatives, and/or partnership development. However, few details as to how these strategies will be implemented are found in the plans. We present the Texas plan as a case study offering detailed insight into how one plan incorporated capacity building and sustainability into its development and implementation. Training, technical assistance, templates, and tools may help CCC coalition members address capacity and sustainability in future planning efforts and assure the inclusion of capacity building and sustainability approaches in CCC plans at the state, tribal, territorial, and jurisdiction levels.

  16. Association of School Characteristics and Implementation in the X:IT Study--A School-Randomized Smoking Prevention Program

    ERIC Educational Resources Information Center

    Bast, Lotus S.; Due, Pernille; Ersbøll, Annette K.; Damsgaard, Mogens T.; Andersen, Anette

    2017-01-01

    Background: Assessment of implementation is essential for the evaluation of school-based preventive activities. Interventions are more easily implemented in schools if detailed instructional manuals, lesson plans, and materials are provided; however, implementation may also be affected by other factors than the intervention itself--for example,…

  17. Ames Research Center FY 2000 Implementation Plan: Leading Technology into the New Millennium

    NASA Technical Reports Server (NTRS)

    2000-01-01

    This document presents the implementation plan for Ames Research Center (ARC) within the overall framework of the NASA Strategic Plan. It describes how ARC intends to implement its Center of Excellence responsibilities, Agency assigned missions, Agency and Enterprise lead programs, and other roles in support of NASA's vision and mission. All Federal agencies are required by the 1993 Government Performance and Results Act to implement a long-term strategic planning process that includes measurable outcomes and strict accountability. At NASA, this planning process is shaped by the Space Act of 1958, annual appropriations, and other external mandates, as well as by customer requirements. The resulting Strategic Plan sets the overall architecture for what we do, identifies who our customers are, and directs where we are going and why. The Strategic Plan is the basis upon which decisions regarding program implementation and resource deployment are made. Whereas the strategic planning process examines the long-term direction of the organization and identifies a specific set of goals, the implementation planning process examines the detailed performance of the organization and allocates resources toward meeting these goals. It is the purpose of this implementation document to provide the connection between the NASA Strategic Plan and the specific programs and support functions that ARC employees perform. This connection flows from the NASA Strategic Plan, through the various Strategic Enterprise plans to the ARC Center of Excellence, primary missions, Lead Center programs, program support responsibilities, and ultimately, to the role of the individual ARC employee.

  18. Research and Development Program Plan for the Center for Engineering Systems Advanced Research (CESAR)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Weisbin, C.R.; Barhen, J.; Hamel, W.R.

    1987-01-01

    A general framework is provided for more detailed planning on an annual basis, both for DOE and for other sponsoring organizations. The charter for the overall intelligent machine research effort is presented along with programmatic and technological goals. A research implementation plan is provided through the FY 1989 horizon.

  19. 78 FR 77628 - Approval and Promulgation of Air Quality Implementation Plans; New Hampshire; Manchester and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-24

    ... Hampshire Department of Environmental Services (NH DES) submitted a SIP revision to EPA that contained... 8-hour CO standard. On August 1, 2012, the NH DES submitted a limited maintenance plan SIP revision... DES's SIP revision uses EPA's limited maintenance plan approach, as detailed in the EPA guidance...

  20. Child restraint workshop series. Volume 2, Ongoing and planned programs

    DOT National Transportation Integrated Search

    1979-09-01

    This final report describes the planning and implementing details of the Child Restraint Workshop series. A child restraint workshop was conducted in each of the : ten NHTSA regions. The purpose of the workshops was to improve the effectiveness of gr...

  1. Partnerships for Policy Development: A Case Study From Uganda’s Costed Implementation Plan for Family Planning

    PubMed Central

    Lipsky, Alyson B; Gribble, James N; Cahaelen, Linda; Sharma, Suneeta

    2016-01-01

    ABSTRACT In global health, partnerships between practitioners and policy makers facilitate stakeholders in jointly addressing those issues that require multiple perspectives for developing, implementing, and evaluating plans, strategies, and programs. For family planning, costed implementation plans (CIPs) are developed through a strategic government-led consultative process that results in a detailed plan for program activities and an estimate of the funding required to achieve an established set of goals. Since 2009, many countries have developed CIPs. Conventionally, the CIP approach has not been defined with partnerships as a focal point; nevertheless, cooperation between key stakeholders is vital to CIP development and execution. Uganda launched a CIP in November 2014, thus providing an opportunity to examine the process through a partnership lens. This article describes Uganda’s CIP development process in detail, grounded in a framework for assessing partnerships, and provides the findings from 22 key informant interviews. Findings reveal strengths in Uganda’s CIP development process, such as willingness to adapt and strong senior management support. However, the evaluation also highlighted challenges, including district health officers (DHOs), who are a key group of implementers, feeling excluded from the development process. There was also a lack of planning around long-term partnership practices that could help address anticipated execution challenges. The authors recommend that future CIP development efforts use a long-term partnership strategy that fosters accountability by encompassing both the short-term goal of developing the CIP and the longer-term goal of achieving the CIP objectives. Although this study focused on Uganda’s CIP for family planning, its lessons have implications for any policy or strategy development efforts that require multiple stakeholders to ensure successful execution. PMID:27353621

  2. Filling the Black Box of Implementation for Health-Promoting Schools

    ERIC Educational Resources Information Center

    Rowling, Louise; Samdal, Oddrun

    2011-01-01

    Purpose: Achieving organisational learning and greater specificity for implementation action for health-promoting schools requires detailed understanding of the necessary components. They include: preparing and planning for school development, policy and institutional anchoring, professional development and learning, leadership and management…

  3. The CNCC Five-Year Plan of Action, 1989-90 to 1993-94.

    ERIC Educational Resources Information Center

    Colorado Northwestern Community Coll., Rangely.

    This six-part report describes the recently developed 5-year strategic plan of action for Colorado Northwestern Community College (CNCC), reviewing the mission and goals of the college, stating 21 organizational objectives in order of priority, and detailing implementation activities for each of the 5 years of the plan. Part I provides a brief…

  4. Accentra Pharmaceuticals: Thrashing through ERP Systems

    ERIC Educational Resources Information Center

    Bradds, Nathan; Hills, Emily; Masters, Kelly; Weiss, Kevin; Havelka, Douglas

    2017-01-01

    Implementing and integrating an Enterprise Resource Planning (ERP) system into an organization is an enormous undertaking that requires substantial cash outlays, time commitments, and skilled IT and business personnel. It requires careful and detailed planning, thorough testing and training, and a change management process that creates a…

  5. Experience measuring performance improvement in multiphase picture archiving and communications systems implementations.

    PubMed

    Reed, G; Reed, D H

    1999-05-01

    When planning a picture archiving and communications system (PACS) implementation and determining which equipment will be implemented in earlier and later phases, collection and analysis of selected data will aid in setting implementation priorities. If baseline data are acquired relative to performance objectives, the same information used for implementation planning can be used to measure performance improvement and outcomes. The main categories of data to choose from are: (1) financial data; (2) productivity data; (3) operational parameters; (4) clinical data; and (5) information about customer satisfaction. In the authors' experience, detailed workflow data have not proved valuable in measuring PACS performance and outcomes. Reviewing only one category of data in planning will not provide adequate basis for targeting operational improvements that will lead to the most significant gains. Quality improvement takes into account all factors in production: human capacity, materials, operating capital and assets. Once we have identified key areas of focus for quality improvement in each phase, we can translate objectives into implementation requirements and finally into detailed functional and performance requirements. Here, Integration Resources reports its experience measuring PACS performance relative to phased implementation strategies for three large medical centers. Each medical center had its own objectives for overcoming image management, physical/geographical, and functional/technical barriers. The report outlines (1) principal financial and nonfinancial measures used as performance indicators; (2) implementation strategies chosen by each of the three medical centers; and (3) the results of those strategies as compared with baseline data.

  6. Los Alamos National Laboratory emergency management plan. Revision 1

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ramsey, G.F.

    1998-07-15

    The Laboratory has developed this Emergency Management Plan (EMP) to assist in emergency planning, preparedness, and response to anticipated and actual emergencies. The Plan establishes guidance for ensuring safe Laboratory operation, protection of the environment, and safeguarding Department of Energy (DOE) property. Detailed information and specific instructions required by emergency response personnel to implement the EMP are contained in the Emergency Management Plan Implementing Procedure (EMPIP) document, which consists of individual EMPIPs. The EMP and EMPIPs may be used to assist in resolving emergencies including but not limited to fires, high-energy accidents, hazardous material releases (radioactive and nonradioactive), security incidents,more » transportation accidents, electrical accidents, and natural disasters.« less

  7. Defense Health Care Reform: Additional Implementation Details Would Increase Transparency of DOD’s Plans and Enhance Accountability

    DTIC Science & Technology

    2013-11-01

    on timelines; and was not required to include information on shared services because the reporting time frame was not applicable. GAO also assessed...implementation costs and aggregated cost-savings estimates for the consolidation of four shared services . However, some key details of a sound business...case were missing, such as the basis for the savings. DOD’s business cases aggregated the separate business lines of its shared services , which

  8. Improving TOGAF ADM 9.1 Migration Planning Phase by ITIL V3 Service Transition

    NASA Astrophysics Data System (ADS)

    Hanum Harani, Nisa; Akhmad Arman, Arry; Maulana Awangga, Rolly

    2018-04-01

    Modification planning of business transformation involving technological utilization required a system of transition and migration planning process. Planning of system migration activity is the most important. The migration process is including complex elements such as business re-engineering, transition scheme mapping, data transformation, application development, individual involvement by computer and trial interaction. TOGAF ADM is the framework and method of enterprise architecture implementation. TOGAF ADM provides a manual refer to the architecture and migration planning. The planning includes an implementation solution, in this case, IT solution, but when the solution becomes an IT operational planning, TOGAF could not handle it. This paper presents a new model framework detail transitions process of integration between TOGAF and ITIL. We evaluated our models in field study inside a private university.

  9. The Challenge of Implementing an ERP System in a Small and Medium Enterprise--A Teaching Case of ERP Project Management

    ERIC Educational Resources Information Center

    Xu, Hongjiang; Rondeau, Patrick J.; Mahenthiran, Sakthi

    2011-01-01

    Enterprise Resource Planning (ERP) system implementation projects are notoriously risky. While large-scale ERP cases continue to be developed, relatively few new ERP cases have been published that further ERP implementation education in small to medium size firms. This case details the implementation of a new ERP system in a medium sized…

  10. Space Station Furnace Facility Preliminary Project Implementation Plan (PIP). Volume 2, Appendix 2

    NASA Technical Reports Server (NTRS)

    Perkey, John K.

    1992-01-01

    The Space Station Furnace Facility (SSFF) is an advanced facility for materials research in the microgravity environment of the Space Station Freedom and will consist of Core equipment and various sets of Furnace Module (FM) equipment in a three-rack configuration. This Project Implementation Plan (PIP) document was developed to satisfy the requirements of Data Requirement Number 4 for the SSFF study (Phase B). This PIP shall address the planning of the activities required to perform the detailed design and development of the SSFF for the Phase C/D portion of this contract.

  11. 40 CFR 267.58 - What notification and recordkeeping must I do after an emergency?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... AGENCY (CONTINUED) SOLID WASTES (CONTINUED) STANDARDS FOR OWNERS AND OPERATORS OF HAZARDOUS WASTE FACILITIES OPERATING UNDER A STANDARDIZED PERMIT Contingency Plan and Emergency Procedures § 267.58 What..., and details of any incident that requires implementing the contingency plan in the operating record...

  12. 40 CFR 51.116 - Data availability.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 2 2013-07-01 2013-07-01 false Data availability. 51.116 Section 51... FOR PREPARATION, ADOPTION, AND SUBMITTAL OF IMPLEMENTATION PLANS Control Strategy § 51.116 Data availability. (a) The State must retain all detailed data and calculations used in the preparation of each plan...

  13. 40 CFR 51.116 - Data availability.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 2 2014-07-01 2014-07-01 false Data availability. 51.116 Section 51... FOR PREPARATION, ADOPTION, AND SUBMITTAL OF IMPLEMENTATION PLANS Control Strategy § 51.116 Data availability. (a) The State must retain all detailed data and calculations used in the preparation of each plan...

  14. 40 CFR 51.116 - Data availability.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 2 2012-07-01 2012-07-01 false Data availability. 51.116 Section 51... FOR PREPARATION, ADOPTION, AND SUBMITTAL OF IMPLEMENTATION PLANS Control Strategy § 51.116 Data availability. (a) The State must retain all detailed data and calculations used in the preparation of each plan...

  15. 40 CFR 51.114 - Emissions data and projections.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 2 2010-07-01 2010-07-01 false Emissions data and projections. 51.114... REQUIREMENTS FOR PREPARATION, ADOPTION, AND SUBMITTAL OF IMPLEMENTATION PLANS Control Strategy § 51.114 Emissions data and projections. (a) Except for lead, each plan must contain a detailed inventory of...

  16. 40 CFR 51.114 - Emissions data and projections.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 2 2011-07-01 2011-07-01 false Emissions data and projections. 51.114... REQUIREMENTS FOR PREPARATION, ADOPTION, AND SUBMITTAL OF IMPLEMENTATION PLANS Control Strategy § 51.114 Emissions data and projections. (a) Except for lead, each plan must contain a detailed inventory of...

  17. Implementation of a new advanced graduate education program in oral implantology.

    PubMed

    Gallucci, German O; Weber, Hans Peter; Kalenderian, Elsbeth

    2012-10-01

    The academic program for the Harvard School of Dental Medicine's Advanced Graduate Program in Oral Implantology is based on scientific evidence applied to educational quality, translational research, patient care, and service. The objective of the program is to enable highly motivated individuals with proven scholarship and excellence in patient care to achieve academic leadership in the clinical and scientific fields of implant dentistry and tissue regeneration. A detailed curriculum describing the academic program, as well as a business plan (which included a management plan describing the organizational structure, financial implications, and market forces) and implementation and communication plans, were developed before moving forward. With careful academic and business planning, the result was a vibrant implant program, in which all placements and restorations of implants are coordinated with regard to practice management. The program is integrated into the existing clinical care model and has been financially self-sustaining from its inception. Six students have participated in the last two years. On average, each student performed seventy-nine procedures on twenty-nine patients, generating over $46,000 in production. The curriculum includes didactics, hands-on clinical learning, and research activities. Research is a critical component as well. The results demonstrate that the time taken to develop a detailed curriculum and business plan for a new academic program, which anticipated and resolved potential barriers to success, was instrumental in the successful implementation of an oral implantology residency program.

  18. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Larsen, Barbara L.

    The annual program report provides detailed information about all aspects of the SNL/CA Environmental Planning and Ecology Program for a given calendar year. It functions as supporting documentation to the SNL/CA Environmental Management System Program Manual. The 2005 program report describes the activities undertaken during the past year, and activities planned in future years to implement the Planning and Ecology Program, one of six programs that supports environmental management at SNL/CA.

  19. Integrated payload and mission planning, phase 3. Volume 1: Integrated payload and mission planning process evaluation

    NASA Technical Reports Server (NTRS)

    Sapp, T. P.; Davin, D. E.

    1977-01-01

    The integrated payload and mission planning process for STS payloads was defined, and discrete tasks which evaluate performance and support initial implementation of this process were conducted. The scope of activity was limited to NASA and NASA-related payload missions only. The integrated payload and mission planning process was defined in detail, including all related interfaces and scheduling requirements. Related to the payload mission planning process, a methodology for assessing early Spacelab mission manager assignment schedules was defined.

  20. In Brief: Climate Change Technology Program Plan

    NASA Astrophysics Data System (ADS)

    Bierly, Eugene

    2006-09-01

    The U.S. Department of Energy released its Plan for Climate Change Technology Programs (CCTP) at a 20 September hearing of the U.S. House of Representatives Science Subcommittee on energy. The goal of the hearing, which was chaired by Rep. Judy Biggert (R-Ill.), was to examine the Bush Administration's CCTP plan, review it in light of the Administration's stated goals, and determine what action might be undertaken to implement the plan. For details of the plan, see http://www.climatetechnology.gov/stratplan/final/index.htm

  1. NASA ELV Payload Safety Program Information Exchange

    NASA Technical Reports Server (NTRS)

    Staubus, Cal; Palo, Tom; Dook, Mike; Donovan, Shawn

    2007-01-01

    This presentation details the Expendable Launch Vehicle (ELV) Payload Safety Program in its development and plan for implementation. It is an overview of the program's policies, process and requirements.

  2. A Four-Stage Model for Planning Computer-Based Instruction.

    ERIC Educational Resources Information Center

    Morrison, Gary R.; Ross, Steven M.

    1988-01-01

    Describes a flexible planning process for developing computer based instruction (CBI) in which the CBI design is implemented on paper between the lesson design and the program production. A four-stage model is explained, including (1) an initial flowchart, (2) storyboards, (3) a detailed flowchart, and (4) an evaluation. (16 references)…

  3. 78 FR 46516 - Approval and Promulgation of Air Quality Implementation Plans; Pennsylvania; Update to Materials...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-01

    ... for incorporating by reference Federally- approved SIPs, as a result of consultations between EPA and... and ``Identification of plan'' format are discussed in further detail in the May 22, 1997 Federal... ``good cause'' exemption in section 553(b)(3)(B) of the Administrative Procedures Act (APA) which, upon...

  4. US/Canada wheat and barley crop calender exploratory experiment implementation plan

    NASA Technical Reports Server (NTRS)

    1980-01-01

    A plan is detailed for a supplemental experiment to evaluate several crop growth stage models and crop starter models. The objective of this experiment is to provide timely information to aid in understanding crop calendars and to provide data that will allow a selection between current crop calendar models.

  5. PC-based Multiple Information System Interface (PC/MISI) design plan

    NASA Technical Reports Server (NTRS)

    Dominick, Wayne D. (Editor); Hall, Philip P.

    1985-01-01

    The general design plan for the implementation of a common user interface to multiple remote information systems within a microcomputer-based environment is presented. The intent is to provide a framework for the development of detailed specifications which will be used as guidelines for the actual development of the system.

  6. Application of automatic vehicle location in law enforcement: An introductory planning guide

    NASA Technical Reports Server (NTRS)

    Hansen, G. R.; Leflang, W. G.

    1976-01-01

    A set of planning guidelines for the application of automatic vehicle location (AVL) to law enforcement is presented. Some essential characteristics and applications of AVL are outlined; systems in the operational or planning phases are discussed. Requirements analysis, system concept design, implementation planning, and performance and cost modeling are described and demonstrated with numerous examples. A detailed description of a typical law enforcement AVL system, and a list of vendor sources are given in appendixes.

  7. Strengthening of competence planning truss through instructional media development details

    NASA Astrophysics Data System (ADS)

    Handayani, Sri; Nurcahyono, M. Hadi

    2017-03-01

    Competency-Based Learning is a model of learning in which the planning, implementation, and assessment refers to the mastery of competencies. Learning in lectures conducted in the framework for comprehensively realizing student competency. Competence means the orientation of the learning activities in the classroom must be given to the students to be more active learning, active search for information themselves and explore alone or with friends in learning activities in pairs or in groups, learn to use a variety of learning resources and printed materials, electronic media, as well as environment. Analysis of learning wooden structure known weakness in the understanding of the truss detail. Hence the need for the development of media that can provide a clear picture of what the structure of the wooden horses and connection details. Development of instructional media consisted of three phases of activity, namely planning, production and assessment. Learning Media planning should be tailored to the needs and conditions necessary to provide reinforcement to the mastery of competencies, through the table material needs. The production process of learning media is done by using hardware (hardware) and software (software) to support the creation of a medium of learning. Assessment of the media poduk yan include feasibility studies, namely by subject matter experts, media experts, while testing was done according to the student's perception of the product. The results of the analysis of the materials for the instructional aspects of the results obtained 100% (very good) and media analysis for the design aspects of the media expressed very good with a percentage of 88.93%. While the analysis of student perceptions expressed very good with a percentage of 84.84%. Media Learning Truss Details feasible and can be used in the implementation of learning wooden structure to provide capacity-building in planning truss

  8. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Larsen, Barbara L.

    The annual program report provides detailed information about all aspects of the Sandia National Laboratories, California (SNL/CA) Environmental Planning and Ecology Program for a given calendar year. It functions as supporting documentation to the SNL/CA Environmental Management System Program Manual. The 2006 program report describes the activities undertaken during the past year, and activities planned in future years to implement the Planning and Ecology Program, one of six programs that supports environmental management at SNL/CA.

  9. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Larsen, Barbara L.

    The annual program report provides detailed information about all aspects of the Sandia National Laboratories, California (SNL/CA) Environmental Planning and Ecology Program for a given calendar year. It functions as supporting documentation to the SNL/CA Environmental Management System Program Manual. The program report describes the activities undertaken during the past year, and activities planned in future years to implement the Planning and Ecology Program, one of six programs that supports environmental management at SNL/CA.

  10. An allotment planning concept and related computer software for planning the fixed satellite service at the 1988 space WARC

    NASA Technical Reports Server (NTRS)

    Miller, Edward F.; Heyward, Ann O.; Ponchak, Denise S.; Spence, Rodney L.; Whyte, Wayne A., Jr.

    1987-01-01

    The authors describe a two-phase approach to allotment planning suitable for use in planning the fixed satellite service at the 1988 Space World Administrative radio Conference (ORB-88). The two phases are (1) the identification of predetermined geostationary arc segments common to groups of administrations and (2) the use of a synthesis program to identify example scenarios of space station placements. The planning approach is described in detail and is related to the objectives of the conference. Computer software has been developed to implement the concepts, and the logic and rationale for identifying predetermined arc segments is discussed. Example scenarios are evaluated to give guidance in the selection of the technical characteristics of space communications systems to be planned. The allotment planning concept described guarantees equitable access to the geostationary orbit, provides flexibility in implementation, and reduces the need for coordination among administrations.

  11. The Development and Implementation of Ground Safety Requirements for Project Orion Abort Flight Testing - A Case Study

    NASA Technical Reports Server (NTRS)

    Kirkpatrick, Paul D.; Williams, Jeffrey G.; Condzella, Bill R.

    2008-01-01

    A rigorous set of detailed ground safety requirements is required to make sure that ground support equipment (GSE) and associated planned ground operations are conducted safely. Detailed ground safety requirements supplement the GSE requirements already called out in NASA-STD-5005. This paper will describe the initial genesis of these ground safety requirements, the establishment and approval process and finally the implementation process for Project Orion. The future of the requirements will also be described. Problems and issues encountered and overcame will be discussed.

  12. Software verification plan for GCS. [guidance and control software

    NASA Technical Reports Server (NTRS)

    Dent, Leslie A.; Shagnea, Anita M.; Hayhurst, Kelly J.

    1990-01-01

    This verification plan is written as part of an experiment designed to study the fundamental characteristics of the software failure process. The experiment will be conducted using several implementations of software that were produced according to industry-standard guidelines, namely the Radio Technical Commission for Aeronautics RTCA/DO-178A guidelines, Software Consideration in Airborne Systems and Equipment Certification, for the development of flight software. This plan fulfills the DO-178A requirements for providing instructions on the testing of each implementation of software. The plan details the verification activities to be performed at each phase in the development process, contains a step by step description of the testing procedures, and discusses all of the tools used throughout the verification process.

  13. Feasibility study for early removal of HEU from CPP-651-Phase II

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Smith, C.V.; Henry, R.; Milligan, C.

    1997-09-01

    A two-phase feasibility study was initiated in late 1996 to identify a way to expedite the removal of SNM from the CPP-651 vault. The first phase of this study provided preliminary information that appeared promising, but needed additional detailed planning and evaluate to validate the concepts and conclusions. The focus of Phase 2 was to provide the validation via resource-loaded schedules and more detailed cost estimates. Section 1 describes the purpose and objectives of the Phase 2 tasks and the programmatic drivers that influence related CPP-651 high-enriched uranium (HEU) management issues. Section 2 identifies the evaluation criteria and methodology andmore » the transfer issues and barriers preventing shipment. Section 3 provides site-specific background information for the CPP-651 facility and the Idaho National Engineering and Environmental Laboratory (INEEL) and describes the development of the basic material removal schedule, the proposed base case plan for removal of SNM, and the proposed HEU material management/shipping issues and strategies. Section 4 identifies the proposed options for accelerated removal of SNM and how they were evaluated via detailed scheduling, resource histograms, and cost analysis. Section 5 summarizes principal tasks for implementing this plan and other related HEU CPP-651 management issues that require continued planning efforts to assure successful implementation of this proposed early removal strategy.« less

  14. 75 FR 81474 - Approval and Promulgation of Air Quality Implementation Plans; West Virginia; Update to Materials...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-28

    ... revised the procedures for incorporating by reference Federally-approved SIPs as a result of consultations... procedures and ``Identification of plan'' format are discussed in further detail in the May 22, 1997 Federal... column so that the date format is consistent with that found throughout the paragraph. c. 45 CSR 21...

  15. 77 FR 76417 - Approval and Promulgation of Air Quality Implementation Plans; Idaho; Update to Materials...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-28

    ... result of consultations between EPA and the Office of the Federal Register (OFR). The description of the revised SIP document, IBR procedures and ``Identification of plan'' format are discussed in further detail... the ``good cause'' exemption in section 553(b)(3)(B) of the Administrative Procedures Act (APA) [[Page...

  16. Handbook for a Commitment to America's Future: A Toolkit for Leaders of State-Level P-16

    ERIC Educational Resources Information Center

    Business-Higher Education Forum (NJ1), 2005

    2005-01-01

    This handbook provides P-16 council leaders with a toolkit of background information and proposed procedures for structuring and guiding implementation of Business-Higher Education Forum's (BHEF) proposed action plan. Specifically, it details a four-part nationwide action plan to improve overall pre-kindergarten through high school (P-12)…

  17. Nebraska Work Based Learning Manual. Planning and Implementation Guides for Educators, Employers, Policymakers, and Parents.

    ERIC Educational Resources Information Center

    Nebraska State Dept. of Education, Lincoln.

    This manual contains a series of 10 detailed guides for school practitioners who are beginning to create work-based learning programs at their schools. Work-Based Learning Overview defines the different elements of work-based learning and describes the roles of program participants. Program Planning Guide offers suggestions about how to plan…

  18. West Valley demonstration project: Implementation of the kerosene mitigation plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Blickwedehl, R.R.; Goodman, J.; Valenti, P.J.

    1987-05-01

    An aggressive program was implemented to mitigate the migration of radioactive kerosene believed to have originated from the West Valley NRC-Licensed Disposal Area (NDA) disposal trenches designated as SH-10 and SH-11 (Special Holes 10 and 11). This report provides a historical background of the events leading to the migration problem, the results of a detailed investigation to determine the location and source of the kerosene migration, the remediation plan to mitigate the migration, and the actions taken to successfully stabilize the kerosene. 7 refs., 19 figs., 1 tab.

  19. Collaboration process for integrated social and health care strategy implementation.

    PubMed

    Korpela, Jukka; Elfvengren, Kalle; Kaarna, Tanja; Tepponen, Merja; Tuominen, Markku

    2012-01-01

    To present a collaboration process for creating a roadmap for the implementation of a strategy for integrated health and social care. The developed collaboration process includes multiple phases and uses electronic group decision support system technology (GDSS). A case study done in the South Karelia District of Social and Health Services in Finland during 2010-2011. An expert panel of 13 participants was used in the planning process of the strategy implementation. The participants were interviewed and observed during the case study. As a practical result, a roadmap for integrated health and social care strategy implementation has been developed. The strategic roadmap includes detailed plans of several projects which are needed for successful integration strategy implementation. As an academic result, a collaboration process to create such a roadmap has been developed. The collaboration process and technology seem to suit the planning process well. The participants of the meetings were satisfied with the collaboration process and the GDSS technology. The strategic roadmap was accepted by the participants, which indicates satisfaction with the developed process.

  20. Metrication report to the Congress

    NASA Technical Reports Server (NTRS)

    1991-01-01

    NASA's principal metrication accomplishments for FY 1990 were establishment of metrication policy for major programs, development of an implementing instruction for overall metric policy and initiation of metrication planning for the major program offices. In FY 1991, development of an overall NASA plan and individual program office plans will be completed, requirement assessments will be performed for all support areas, and detailed assessment and transition planning will be undertaken at the institutional level. Metric feasibility decisions on a number of major programs are expected over the next 18 months.

  1. Application of computer-aided dispatch in law enforcement: An introductory planning guide

    NASA Technical Reports Server (NTRS)

    Sohn, R. L.; Gurfield, R. M.; Garcia, E. A.; Fielding, J. E.

    1975-01-01

    A set of planning guidelines for the application of computer-aided dispatching (CAD) to law enforcement is presented. Some essential characteristics and applications of CAD are outlined; the results of a survey of systems in the operational or planning phases are summarized. Requirements analysis, system concept design, implementation planning, and performance and cost modeling are described and demonstrated with numerous examples. Detailed descriptions of typical law enforcement CAD systems, and a list of vendor sources, are given in appendixes.

  2. Cell emulation and preliminary results.

    DOT National Transportation Integrated Search

    2016-07-01

    This report details preliminary results of the testing plan implemented by the Hawaii Natural Energy Institute to evaluate Electric Vehicle (EV) battery durability and reliability under electric utility grid operations. Commercial EV battery cells ar...

  3. Environmental Hazards Assessment Program annual report, [June 1992--June 1993

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1993-10-01

    This report, the Environment Hazards Assessment Program (EHAP) Annual Report, is the second of three reports that document activities under the EHAP grant and details progress made during the first year of the grant. The first year was devoted to the development of a working program implementation plan. During the developmental process some key objectives were achieved such as developing a Doctor of Philosophy degree program in Environmental Studies at MUSC (Medical University of South Carolina) and conducting the first Crossroads of Humanity series Round Table Forum. The PIP (Program Implementation Program) details the objectives, management and budgetary basis formore » the overall management and control of the grant over the next four years, the yearly program plans provide the monthly and day-to-day programmatic and budgetary control by which the PIP was developed.« less

  4. Facilitating Ambulatory Electronic Health Record System Implementation: Evidence from a Qualitative Study

    PubMed Central

    Hefner, Jennifer; Robbins, Julie; Huerta, Timothy R.

    2013-01-01

    Background. Ambulatory care practices have increasing interest in leveraging the capabilities of electronic health record (EHR) systems, but little information is available documenting how organizations have successfully implemented these systems. Objective. To characterize elements of successful electronic health record (EHR) system implementation and to synthesize the key informants' perspectives about successful implementation practices. Methods. Key informant interviews and focus groups were conducted with a purposive sample of individuals from US healthcare organizations identified for their success with ambulatory EHR implementation. Rigorous qualitative data analyses used both deductive and inductive methods. Results. Participants identified personal and system-related barriers, at both the individual and organization levels, including poor computer skills, productivity losses, resistance to change, and EHR system failure. Implementation success was reportedly facilitated by careful planning and consistent communication throughout distinct stages of the implementation process. A significant element of successful implementation was an emphasis on optimization, both during “go-live” and, subsequently, when users had more experience with the system. Conclusion. Successful EHR implementation requires both detailed planning and clear mechanisms to deal with unforeseen or unintended consequences. Focusing on user buy-in early and including plans for optimization can facilitate greater success. PMID:24228257

  5. Assessing how green space types affect ecosystem services delivery in Porto, Portugal

    Treesearch

    Marisa Graça; Paulo Alves; João Gonçalves; David J. Nowak; Robert Hoehn; Paulo Farinha-Marques; Mario Cunha

    2018-01-01

    Significant advances have been made in identifying, quantifying and valuing multiple urban ecosystem services (UES), yet this knowledge remains poorly implemented in urban planning and management. One of the reasons for this low implementation is the insufficient thematic and spatial detail in UES research to provide guidance for urban planners and managers....

  6. An allotment planning concept and related computer software for planning the fixed satellite service at the 1988 space WARC

    NASA Technical Reports Server (NTRS)

    Miller, Edward F.; Heyward, Ann O.; Ponchak, Denise S.; Spence, Rodney L.; Whyte, Wayne A., Jr.; Zuzek, John E.

    1987-01-01

    Described is a two-phase approach to allotment planning suitable for use in establishing the fixed satellite service at the 1988 Space World Administrative Radio Conference (ORB-88). The two phases are (1) the identification of predetermined geostationary arc segments common togroups of administrations, and (2) the use of a synthesis program to identify example scenarios of space station placements. The planning approach is described in detail and is related to the objectives of the confernece. Computer software has been developed to implement the concepts, and a complete discussion on the logic and rationale for identifying predetermined arc segments is given. Example scenarios are evaluated to give guidance in the selection of the technical characteristics of space communications systems to be planned. The allotment planning concept described guarantees in practice equitable access to the geostationary orbit, provides flexibility in implementation, and reduces the need for coordination among administrations.

  7. Shifting Resources and Focus to Meet the Goals of the National HIV/AIDS Strategy: The Enhanced Comprehensive HIV Prevention Planning Project, 2010–2013

    PubMed Central

    Purcell, David W.; Fisher, Holly H.; Belcher, Lisa; Carey, James W.; Courtenay-Quirk, Cari; Dunbar, Erica; Eke, Agatha N.; Galindo, Carla A.; Glassman, Marlene; Margolis, Andrew D.; Neumann, Mary Spink; Prather, Cynthia; Stratford, Dale; Taylor, Raekiela D.; Mermin, Jonathan

    2016-01-01

    In September 2010, CDC launched the Enhanced Comprehensive HIV Prevention Planning (ECHPP) project to shift HIV-related activities to meet goals of the 2010 National HIV/AIDS Strategy (NHAS). Twelve health departments in cities with high AIDS burden participated. These 12 grantees submitted plans detailing jurisdiction-level goals, strategies, and objectives for HIV prevention and care activities. We reviewed plans to identify themes in the planning process and initial implementation. Planning themes included data integration, broad engagement of partners, and resource allocation modeling. Implementation themes included organizational change, building partnerships, enhancing data use, developing protocols and policies, and providing training and technical assistance for new and expanded activities. Pilot programs also allowed grantees to assess the feasibility of large-scale implementation. These findings indicate that health departments in areas hardest hit by HIV are shifting their HIV prevention and care programs to increase local impact. Examples from ECHPP will be of interest to other health departments as they work toward meeting the NHAS goals. PMID:26843670

  8. Effective Response to School Violence: A Guide for Educators and Law Enforcement Personnel.

    ERIC Educational Resources Information Center

    Jones, Tony L.

    This guide is designed to meet the security response needs of educators and law-enforcement personnel by detailing how an effective response plan can be developed to deal with school violence. By implementing the guidelines detailed in this book, those in responsible positions can help prevent the incalculable costs of death and chaos these acts…

  9. Planning in the Continuous Operations Environment of the International Space Station

    NASA Technical Reports Server (NTRS)

    Maxwell, Theresa; Hagopian, Jeff

    1996-01-01

    The continuous operation planning approach developed for the operations planning of the International Space Station (ISS) is reported on. The approach was designed to be a robust and cost-effective method. It separates ISS planning into two planning functions: long-range planning for a fixed length planning horizon which continually moves forward as ISS operations progress, and short-range planning which takes a small segment of the long-range plan and develops a detailed operations schedule. The continuous approach is compared with the incremental approach, the short and long-range planning functions are described, and the benefits and challenges of implementing a continuous operations planning approach for the ISS are summarized.

  10. Deadline Extended for Public Comment on IOOS' Draft Plan for Data Management andCommunications Component

    NASA Astrophysics Data System (ADS)

    The U.S. Integrated Ocean Observing System (IOOS) is encouraging public comment on the draft plan for its Data Management and Communications (DMAC∥ component. The deadline for receipt of comments has been extended to 18 November 2003. The plan can be found at http://www.dmac.ocean.us/dacsc/imp_plan.jsp. The plan was developed by the DMAC Steering Committee, which includes representatives from federal and state agencies, private industry, and academia. This committee was tasked by Ocean.US (the national office for IOOS) with the preparation of a detailed, phased DMAC implementation plan, and initial oversight of its implementation. The scope of the plan includes the IOOS DMAC infrastructure, data archive and access, and basic information products needed for assessing the availability and quality of data within IOOS. Four expert teams (Data Transport, Metadata and Data Discovery, Data Archive and Access, Applications and Products), and two outreach teams (Data Facilities Management, and User Outreach), were assembled to assist in developing material for the plan.

  11. 76 FR 9652 - Approval and Promulgation of Air Quality Implementation Plans; District of Columbia; Update to...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-22

    ... by reference Federally- approved SIPs, as a result of consultations between EPA and Office of the...'') of plan format are discussed in further detail in the May 22, 1997 Federal Register document. On...). 3. Making corrections to several table entries in paragraph 52.470(e) so that the date format in the...

  12. Library Public Relations, Promotions, and Communications: A How-To-Do-It Manual. How-To-Do-It Manuals for Librarians Number 75.

    ERIC Educational Resources Information Center

    Wolfe, Lisa A.

    This book provides an introduction to basic communications concepts, a step-by-step process for developing and implementing a library public relations/communications plan, and descriptions of effective library communications tools and strategies. Detailed examples of the application of solid communications planning in school, public, academic, and…

  13. The technical implementation of an IMPT system for research purpose

    NASA Astrophysics Data System (ADS)

    Nguyen, T. T. C.; Nguyen, B. T.; Mai, N. V.

    2018-03-01

    Because of their superior distribution, proton beams is the state-of-the-art modality in radiation therapy. There is a variety of researchers about proton therapy to utilize it. In this paper, we introduce a Matlab-based platform to develop and prototype proton treatment planning using LAP and CERR. Planning workflow to make an IMPT plan is described in details and demonstrated by a prostate case. The results showed that most of the dose criteria are satisfied, except for bladder and rectum, 2% of the volume of each organ receiving the least dose of 77.5 Gy (RBE) instead of 76 Gy(RBE) as dose requirements suggested by ICRU 78. As a result, planners absolutely can implement Intensity Modulated Proton Therapy plans by LAP and CERR for research purpose.

  14. Multi-community command and control systems in law enforcement: An introductory planning guide

    NASA Technical Reports Server (NTRS)

    Sohn, R. L.; Garcia, E. A.; Kennedy, R. D.

    1976-01-01

    A set of planning guidelines for multi-community command and control systems in law enforcement is presented. Essential characteristics and applications of these systems are outlined. Requirements analysis, system concept design, implementation planning, and performance and cost modeling are described and demonstrated with numerous examples. Program management techniques and joint powers agreements for multicommunity programs are discussed in detail. A description of a typical multi-community computer-aided dispatch system is appended.

  15. Acquisition Handbook - Update. Comprehensive Approach to Reusable Defensive Software (CARDS)

    DTIC Science & Technology

    1994-03-25

    designs, and implementation components (source code, test plans, procedures and results, and system/software documentation). This handbook provides a...activities where software components are acquired, evaluated, tested and sometimes modified. In addition to serving as a facility for the acquisition and...systems from such components [1]. Implementation components are at the lowest level and consist of: specifications; detailed designs; code, test

  16. To develop effective strategies for mainstreaming intelligent transportation systems (ITS).

    DOT National Transportation Integrated Search

    2002-11-01

    This report investigates factors affecting ITS implementation as a mainstream transportation planning activity. It draws upon a detailed literature review, interviews with fifty-one leaders from a cross-section of jurisdictions and agencies in ...

  17. SU-F-T-94: Plan2pdf - a Software Tool for Automatic Plan Report for Philips Pinnacle TPS

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Wu, C

    Purpose: To implement an automatic electronic PDF plan reporting tool for Philips Pinnacle treatment planning system (TPS) Methods: An electronic treatment plan reporting software is developed by us to enable fully automatic PDF report from Pinnacle TPS to external EMR programs such as MOSAIQ. The tool is named “plan2pdf”. plan2pdf is implemented using Pinnacle scripts, Java and UNIX shell scripts, without any external program needed. plan2pdf supports full auto-mode and manual mode reporting. In full auto-mode, with a single mouse click, plan2pdf will generate a detailed Pinnacle plan report in PDF format, which includes customizable cover page, Pinnacle plan summary,more » orthogonal views through each plan POI and maximum dose point, DRR for each beam, serial transverse views captured throughout the dose grid at a user specified interval, DVH and scorecard windows. The final PDF report is also automatically bookmarked for each section above for convenient plan review. The final PDF report can either be saved on a user specified folder on Pinnacle, or it can be automatically exported to an EMR import folder via a user configured FTP service. In manual capture mode, plan2pdf allows users to capture any Pinnacle plan by full screen, individual window or rectangular ROI drawn on screen. Furthermore, to avoid possible patients’ plan mix-up during auto-mode reporting, a user conflict check feature is included in plan2pdf: it prompts user to wait if another patient is being exported by plan2pdf by another user. Results: plan2pdf is tested extensively and successfully at our institution consists of 5 centers, 15 dosimetrists and 10 physicists, running Pinnacle version 9.10 on Enterprise servers. Conclusion: plan2pdf provides a highly efficient, user friendly and clinical proven platform for all Philips Pinnacle users, to generate a detailed plan report in PDF format for external EMR systems.« less

  18. Employee Perceptions of Their Organization's Level of Emergency Preparedness Following a Brief Workplace Emergency Planning Educational Presentation.

    PubMed

    Renschler, Lauren A; Terrigino, Elizabeth A; Azim, Sabiya; Snider, Elsa; Rhodes, Darson L; Cox, Carol C

    2016-06-01

    A brief emergency planning educational presentation was taught during work hours to a convenience sample of employees of various workplaces in Northern Missouri, USA. Participants were familiarized with details about how an emergency plan is prepared by management and implemented by management-employee crisis management teams - focusing on both employee and management roles. They then applied the presentation information to assess their own organization's emergency preparedness level. Participants possessed significantly (p < 0.05) higher perceptions of their organization's level of emergency preparedness than non-participants. It is recommended that an assessment of organizational preparedness level supplement emergency planning educational presentations in order to immediately apply the material covered and encourage employees to become more involved in their organization's emergency planning and response. Educational strategies that involve management-employee collaboration in activities tailored to each workplace's operations and risk level for emergencies should be implemented.

  19. Drilling, Completion, and Data Collection Plans An Assessment of Geological Carbon Sequestration Options in the Illinois Basin: Phase III

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Malkewicz, Nicholas; Kirksey, Jim; Finley, Robert

    2015-05-01

    Executive Summary The Illinois Basin – Decatur Project (IBDP) is managed by the Midwest Geological Sequestration Consortium (MGSC) and is led by the Illinois State Geological Survey (ISGS) at the University of Illinois. The project site is located on the Archer Daniels Midland Company (ADM) property in Decatur, Illinois, and is a fully integrated carbon capture and storage (CCS) project that uses CO₂ captured from the ethanol-producing fermentation process at the ADM corn-processing plant (Finley et. al., 2013). IBDP has a goal of injecting one million tonnes of CO₂ into the basal sands of the Mt. Simon Sandstone over amore » three-year period. This is a multifaceted project, and this report details the planning and results of the drilling, completions, well testing, log data acquisition, and the Health, Safety, and Environment (HSE) aspects of the project. Three deep wells were planned for the IBDP: • The injection well: Injection Well #1 (CCS1); • The monitoring well (both in-zone and above seal): Verification Well #1 (VW1); and • The geophone monitoring well: Geophysical Monitoring Well #1 (GM1). The detailed plans for these wells are attached to the appendices of this document. The wells were drilled successfully with little deviation from the original plans. The biggest change from the plan to execution was the need to adjust for larger-than-expected loss of circulation in the Potosi section of the Knox Formation. The completions reports also attached to this document detail the well constructions as they were actually built. Injectivity testing was carried out, and the perforating plans were adjusted based on the results. Additional perforations and acidizing were performed as a result of the injectivity testing. The testing plans are detailed in this report along with the actual testing results. The injectivity testing results were used in the modeling and simulation efforts. Detailed HSE plans were developed and implemented during the planning and execution phases of the project. The implementation included an HSE Bridging Document, which served to unify the HSE policies of the project partners and key subcontractors. The HSE plan and actual HSE results are presented in this document. There were no recordable HSE incidents during the project. A detailed logging program was developed based on project needs. The log data were acquired in accordance with the plan, and both the plan and log results are presented in this report. Log data were heavily utilized by the research staff, modelers, reservoir engineers, and for technical and permitting efforts. 5 Several key lessons were learned during the project: • Safety in operations and execution is paramount and is only achieved through proper planning and behavior control. The certainty of this was reinforced through implementation of this lesson and the resultant flawless HSE performance during the project. • Losses of drilling fluid circulation were larger than anticipated within the Potosi Formation. Circulation was only recovered through cementing the loss zones. • When possible, minimizing complexity in permit requirements and well designs is preferable. • The size of the wells were outside of the standard experience and expertise typical within the basin, and therefore required substantial planning and ramp-up of contractors and partners to meet project objectives. • With multiple stakeholders and research partners, establishing objectives and requirements early and adhering to change request procedures throughout the project are critical to manage competing data and sampling objectives that may be detrimental to overall progress. The well construction and completion operations were successfully executed, with all wells built in a manner that achieved excellent wellbore integrity. Log planning involved a number of stakeholders and technical specialists. Data collection from logging, coring, and testing was excellent. Time and effort spent with the associated contractors and suppliers to develop a well plan beyond normal scope proved highly successful, resulting in a well-construction and completion project that surpassed expectations. The world-class HSE results also demonstrate the commitment of all stakeholders in the project. The details follow in the body of this document« less

  20. 76 FR 52278 - Approval and Promulgation of Air Quality Implementation Plans; Maryland; Update to Materials...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-22

    ... incorporating by reference Federally-approved SIPs, as a result of consultations between EPA and the Office of... ``Identification of plan'' format are discussed in further detail in the May 22, 1997 Federal Register document. On....19.09, 26.11.19.24, 26.11.29.11, and 11.14.08.22. 4. Correcting the date format in the ``State...

  1. 78 FR 16449 - Approval and Promulgation of Air Quality Implementation Plans; Indiana; Consent Decree Requirements

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-15

    ... Federal Register for detailed instructions on how to submit comments. FOR FURTHER INFORMATION CONTACT: Sam....sam@epa.gov . SUPPLEMENTARY INFORMATION: In the Final Rules section of this Federal Register, EPA is...

  2. Child restraint workshop series. Volume 1

    DOT National Transportation Integrated Search

    1979-09-01

    This final report describes the planning and implementing details of the Child Restraint Workshop series. A child restraint workshop was conducted in each of the : ten NHTSA regions. The purpose of the workshops was to improve the effectiveness of gr...

  3. Acid Rain Classroom Projects.

    ERIC Educational Resources Information Center

    Demchik, Michael J.

    2000-01-01

    Describes a curriculum plan in which students learn about acid rain through instructional media, research and class presentations, lab activities, simulations, design, and design implementation. Describes the simulation activity in detail and includes materials, procedures, instructions, examples, results, and discussion sections. (SAH)

  4. Research on Evaluation of Conservation Planning Implementation of Nanshe Historic Village in Dongguan City

    NASA Astrophysics Data System (ADS)

    Yubin, Luo

    2017-10-01

    Conservation planning plays an important role in the protection and development of historic villages. The evaluation of conservation planning is helpful to find out the problems existing in the village protection work which helps to improve the conservation planning system. The paper briefly summarizes the conservation planning background of Nanshe historic village in Dongguan city, Guangdong province, China. The conservation planning guided the protection work of Nanshe village since 2002. It evaluates four aspects of the conservation planning implementation and effect such as protection and utilization of the ancient buildings, roadway repair, landscape and basic sanitation facilities improvement by ways of field research and questionnaire survey. There are only nineteen ancient buildings repaired and the rest of them are part of repaired or not repaired. Most of the roadways are well preserved. Only four of them are partly repaired or not repaired. Most of the villagers like to chat under the ancient banyan trees. Conservation Planning pays not much attention to the needs of the residents. Although conservation planning of Nanshe village developed the near, middle and long term target it actually took 14 years to carry out the near target. It enhances the social awareness of Nanshe village and the sense of belongings of the villagers. Most of the villagers are satisfied with the implementation of the conservation planning. Meanwhile, the paper exposes the conservation planning is too idealistic. It lacks of implementation details and the three phases of the investment funds and pays not much attention to the needs of residents.

  5. M-X Environmental Technical Report. Alternative Potential Operating Base Locations Dalhart.

    DTIC Science & Technology

    1980-12-22

    CONTENTS PAGE 1.0 Dalhart and Vicinity Community Environment I 1.1 Human Environment I 1.1.1 Economic Activity 1 1.1.2 Public Finance 9 1.1.3 Population 9...county area. 1.1 HUMAN ENVIRONMENT ECONOMIC ACTIVITY (1.1.1) Employment Tables 1.1.1-1 and 1.1.1-2 highlight detailed employment characteristics of Dallam...clearinghouse responsible for planning in the subject region. The local planning activities are implemented under the authority of "Regional Planning Commissions

  6. Halon 1301 management planning guidance

    NASA Astrophysics Data System (ADS)

    1995-05-01

    This ETL provides guidance to help the Base Civil Engineer (BCE) and other users manage inventories of Halon 1301, an ozone depleting substance used in many facility fire protection systems. This guidance will allow Halon 1301 users to develop the transition plans necessary to implement the DOD and Air Force policies on ozone depleting substances. Attachment 3 to this ETL contains detailed instructions on how to develop a Base Halon 1 301 Management Plan and comply with Air Force policies and regulations designed to minimize dependency on Halon 1301.

  7. Manufacturing Challenges Implementing Material Changes for the Super Light Weight External Tank: A Welding Process Perspective

    NASA Technical Reports Server (NTRS)

    Lawless, K.; Jones, C.

    2001-01-01

    A viewgraph presentation gives an overview of the manufacturing challenges in implementing welding material changes for the super lightweight external tank. Details are given on the external tank configuration, the weld purging equipment used, planning the selection of weld filler wire alloy, the initial weld microstructure, the wide panel tensile testing, and the dome cap welding.

  8. U.S.-Iraq Agreements: Congressional Oversight Activities and Legislative Response

    DTIC Science & Technology

    2009-05-15

    in creating the planned agreements, from negotiation to implementation, and took action to ensure such involvement. Members proposed numerous...matter experts. This has equipped Congress with information pertinent to deciding what further action can be taken to involve Congress more in the...concerning the negotiation, execution, and early implementation of the agreements; the second describes in detail the actions taken by Congress thus

  9. Segmentation: Slicing the Urban Pie.

    ERIC Educational Resources Information Center

    Keim, William A.

    1981-01-01

    Explains market segmentation and defines undifferentiated, concentrated, and differentiated marketing strategies. Describes in detail the marketing planning process at the Metropolitan Community Colleges. Focuses on the development and implementation of an ongoing recruitment program designed for the market segment composed of business employees.…

  10. Space Station Freedom operations planning

    NASA Technical Reports Server (NTRS)

    Accola, Anne L.; Keith, Bryant

    1989-01-01

    The Space Station Freedom program is developing an operations planning structure which assigns responsibility for planning activities to three tiers of management. The strategic level develops the policy, goals and requirements for the program over a five-year horizon. Planning at the tactical level emphasizes program integration and planning for a two-year horizon. The tactical planning process, architecture, and products have been documented and discussed with the international partners. Tactical planning includes the assignment of user and system hardware as well as significant operational events to a time increment (the period of time from the arrival of one Shuttle to the manned base to the arrival of the next). Execution-level planning emphasizes implementation, and each organization produces detailed plans, by increment, that are specific to its function.

  11. Air Force Geophysics Laboratory Management Information System Study.

    DTIC Science & Technology

    1985-11-01

    management information system (MIS) at AFGL. The study summarizes current management and administrative practices at AFGL. Requirements have been identified for automating several currently manual functions to compile accurate and timely information to better manage and plan AFGL programs. This document describes the functions and relative priorities of five MIS subsystems and provides suggestions for implementation solutions. Creation of a detailed Development Plan is recommended as the follow-on task.

  12. Utilizing a Health Impact Assessment (HIA) to Connect Natural Resource Management and Community

    EPA Science Inventory

    Marrying scientific and health research with natural resource management should be a straightforward process. However, differences in purpose, goals, language, levels of detail and implementation authority between the scientists who conduct research and resource managers who plan...

  13. Utilizing a Health Impact Assessment (HIA) to Connect Natural Resource Management and Community(presentation)

    EPA Science Inventory

    Marrying scientific and health research with natural resource management should be a straightforward process. However, differences in purpose, goals, language, levels of detail and implementation authority between the scientists who conduct research and resource managers who plan...

  14. Developing an Intergenerational Program.

    ERIC Educational Resources Information Center

    Brummel, Steven W.

    1989-01-01

    Steps in the development of intergenerational programs include the following: (1) needs assessment; (2) planning; (3) implementation; (4) assuring program longevity; and (5) establishing a national focus. Detailed description of such stages as facility and site procurement, recruitment, orientation, training, maintenance, and support is provided.…

  15. Detailed test plans : Evaluation of Utah Transit Authority Connection Protection system

    DOT National Transportation Integrated Search

    2003-10-31

    The purpose of this evaluation is to assess the effectiveness of the Connection Protection (CP) system implemented by the Utah Transit Authority (UTA). The objective of the CP system is to improve the reliability of transfers from the higher frequenc...

  16. Final Report - Wind and Hydro Energy Feasibility Study - June 2011

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Jim Zoellick; Richard Engel; Rubin Garcia

    2011-06-17

    This feasibility examined two of the Yurok Tribe's most promising renewable energy resources, wind and hydro, to provide the Tribe detailed, site specific information that will result in a comprehensive business plan sufficient to implement a favorable renewable energy project.

  17. Model-based Executive Control through Reactive Planning for Autonomous Rovers

    NASA Technical Reports Server (NTRS)

    Finzi, Alberto; Ingrand, Felix; Muscettola, Nicola

    2004-01-01

    This paper reports on the design and implementation of a real-time executive for a mobile rover that uses a model-based, declarative approach. The control system is based on the Intelligent Distributed Execution Architecture (IDEA), an approach to planning and execution that provides a unified representational and computational framework for an autonomous agent. The basic hypothesis of IDEA is that a large control system can be structured as a collection of interacting agents, each with the same fundamental structure. We show that planning and real-time response are compatible if the executive minimizes the size of the planning problem. We detail the implementation of this approach on an exploration rover (Gromit an RWI ATRV Junior at NASA Ames) presenting different IDEA controllers of the same domain and comparing them with more classical approaches. We demonstrate that the approach is scalable to complex coordination of functional modules needed for autonomous navigation and exploration.

  18. Planning for PACS: a comprehensive guide to nontechnical considerations.

    PubMed

    Cohen, Mervyn D; Rumreich, Lori L; Garriot, Kimberley M; Jennings, S Gregory

    2005-04-01

    A complete picture archiving and communication system (PACS) installation is one of the largest projects a radiology department will undertake. Although technology issues are important, they often draw focus away from many other significant issues This paper describes in detail all of these other necessary components that need to be addressed if a PACS installation is to be relatively trouble free, provides guidelines for successful PACS implementation, and details pitfalls to be avoided.

  19. Promoting Undergraduate Research through Integrative Learning

    ERIC Educational Resources Information Center

    Lewis, Elise C.

    2017-01-01

    Educators in higher education often seek innovative pedagogies to include in their classrooms. This article describes an integrative learning experience and details the planning, implementation, considerations, and benefits of creating a major-specific undergraduate research day. The event created an opportunity for students to gain confidence and…

  20. Development of a nurse case management service: a proposed business plan for rural hospitals.

    PubMed

    Adams, Marsha Howell; Crow, Carolyn S

    2005-01-01

    The nurse case management service (NCMS) for rural hospitals is an entrepreneurial endeavor designed to provide rural patients with quality, cost-effective healthcare. This article describes the development of an NCMS. A detailed marketing and financial plan, a review of industry trends, and the legal structure and risks associated with the development of the venture are presented. The financial plan projects a minimum savings of 223,200 dollars for rural institutions annually. To improve quality and reduce cost for rural hospitals, the authors recommend implementation of an NCMS.

  1. Strategic Environmental Assessment in Germany - Practice and open questions

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Weiland, Ulrike, E-mail: uweiland@uni-leipzig.d

    2010-04-15

    Eight years after the enactment of the EU Strategic Environmental Assessment Directive (2001/42/EC) () it is time to investigate where and how SEA are being implemented in Germany in order to find out open questions and research needs. In this study, we analysed in which planning types SEA are common practice, and where can deficits be identified, and to what extent differences occur between spatial and sectoral planning with respect to carrying out SEA. Pressing challenges in performing SEA as well as open questions are addressed such as the handling of cumulative effects and the interrelationships between the environmental factors,more » and how the monitoring of environmental effects is considered by the practitioners. The results show that SEA is well implemented in local land-use planning, regional planning, and in local landscape planning, while the implementation in sectoral planning varies widely. The SEA in clean air planning is looked at in more detail, because this is discussed controversially in the specialist field, and obstacles against SEA are identified in this field. Finally some new topics are addressed for which solutions in spatial and environmental planning including SEA must be found, e.g. the consideration of biological diversity and the potential role of SEA in climate change. A European study on the identified open questions and their handling in different contexts and countries may allow for a qualitative amendment in practice.« less

  2. Science Planning Implementation and Challenges for the ExoMars Trace Gas Orbiter

    NASA Astrophysics Data System (ADS)

    Ashman, Mike; Cardesin Moinelo, Alejandro; Frew, David; Garcia Beteta, Juan Jose; Geiger, Bernhard; Metcalfe, Leo; Muñoz, Michela; Nespoli, Federico

    2018-05-01

    The ExoMars Science Operations Centre (SOC) is located at ESA's European Space Astronomy Centre (ESAC) in Madrid, Spain and is responsible for coordinating the science planning activities for TGO in order to optimize the scientific return of the mission. The SOC constructs, in accordance with Science Working Team (SWT) science priorities, and in coordination with the PI science teams and ESA's Mission Operations Centre (MOC), a plan of scientific observations and delivers conflict free operational products for uplink and execution on-board. To achieve this, the SOC employs a planning concept based on Long, Medium and Short Term planning cycles. Long Term planning covers mission segments of several months and is conducted many months prior to execution. Its goal is to establish a feasible science observation strategy given the science priorities and the expected mission profile. Medium Term planning covers a 1 month mission segment and is conducted from 3 to 2 months prior to execution whilst Short Term planning covers a 1 week segment and is conducted from 2 weeks to 1 week prior to execution. The goals of Medium and Short Term planning are to operationally instantiate and validate the Long Term plan such that the SOC may deliver to MOC a conflict free spacecraft pointing profile request (a Medium Term planning deliverable), and the final instrument telecommanding products (a Short Term planning deliverable) such that the science plan is achieved and all operational constraints are met. With a 2 hour-400km science orbit, the vast number of solar occultation, nadir measurement, and surface imaging opportunities, combined with additional mission constraints such as the necessary provision of TGO communication slots to support the ExoMars 2020 Rover & Surface Platform mission and NASA surface assets, creates a science planning task of considerable magnitude and complexity. In this paper, we detail how the SOC is developing and implementing the necessary planning infrastructure, processes and automation in order to support science planning of this scale throughout the TGO mission. We also detail how the re-use and further development of ESA's multi-mission planning software tool is being implemented in order to provide the necessary additional functionality for the SOC's planning team to exploit, and to therefore ensure the optimum scientific return of the TGO mission. Finally, we provide an overview and status of the real science planning activities taking place in the first weeks of the nominal science phase in the first half of 2018.

  3. Performance validation of the ANSER control laws for the F-18 HARV

    NASA Technical Reports Server (NTRS)

    Messina, Michael D.

    1995-01-01

    The ANSER control laws were implemented in Ada by NASA Dryden for flight test on the High Alpha Research Vehicle (HARV). The Ada implementation was tested in the hardware-in-the-loop (HIL) simulation, and results were compared to those obtained with the NASA Langley batch Fortran implementation of the control laws which are considered the 'truth model.' This report documents the performance validation test results between these implementations. This report contains the ANSER performance validation test plan, HIL versus batch time-history comparisons, simulation scripts used to generate checkcases, and detailed analysis of discrepancies discovered during testing.

  4. Performance validation of the ANSER Control Laws for the F-18 HARV

    NASA Technical Reports Server (NTRS)

    Messina, Michael D.

    1995-01-01

    The ANSER control laws were implemented in Ada by NASA Dryden for flight test on the High Alpha Research Vehicle (HARV). The Ada implementation was tested in the hardware-in-the-loop (HIL) simulation, and results were compared to those obtained with the NASA Langley batch Fortran implementation of the control laws which are considered the 'truth model'. This report documents the performance validation test results between these implementations. This report contains the ANSER performance validation test plan, HIL versus batch time-history comparisons, simulation scripts used to generate checkcases, and detailed analysis of discrepancies discovered during testing.

  5. Web-based GIS for collaborative planning and public participation: an application to the strategic planning of wind farm sites.

    PubMed

    Simão, Ana; Densham, Paul J; Haklay, Mordechai Muki

    2009-05-01

    Spatial planning typically involves multiple stakeholders. To any specific planning problem, stakeholders often bring different levels of knowledge about the components of the problem and make assumptions, reflecting their individual experiences, that yield conflicting views about desirable planning outcomes. Consequently, stakeholders need to learn about the likely outcomes that result from their stated preferences; this learning can be supported through enhanced access to information, increased public participation in spatial decision-making and support for distributed collaboration amongst planners, stakeholders and the public. This paper presents a conceptual system framework for web-based GIS that supports public participation in collaborative planning. The framework combines an information area, a Multi-Criteria Spatial Decision Support System (MC-SDSS) and an argumentation map to support distributed and asynchronous collaboration in spatial planning. After analysing the novel aspects of this framework, the paper describes its implementation, as a proof of concept, in a system for Web-based Participatory Wind Energy Planning (WePWEP). Details are provided on the specific implementation of each of WePWEP's four tiers, including technical and structural aspects. Throughout the paper, particular emphasis is placed on the need to support user learning throughout the planning process.

  6. Energy emergency contingency plan

    NASA Astrophysics Data System (ADS)

    1980-11-01

    The feasibility of implementing certain contingency measures to relieve or eliminate capacity shortfalls on subsidized bus transportation under the auspices of the New Jersey Transit Corporation is detailed. The primary purpose is to evaluate effective short range strategies to expand existing transit services, capable of being implemented within two weeks, should a reduction of fuel supplies curtail travel by automobile. The study area is in the nine northern counties of New Jersey under Tri-State jurisdiction.

  7. Actor coalitions and implementation in strategic delta planning: Opening the Haringvliet sluices in the Netherlands

    NASA Astrophysics Data System (ADS)

    Vermoolen, Myrthe; Hermans, Leon

    2016-04-01

    The sustained development of urbanizing deltas is influenced by natural and societal processes. These processes are characterized by their long time span, in which conflicting interests of different stakeholders have to be reconciled. Reaching consent between actors is a challenge itself, but maintaining this consent throughout different stages of strategic planning - from advocacy and agenda setting to implementation - over these long periods of time is even more difficult. The implementation stage still includes many different actors involved, some of which are different than the ones who agreed before, due to both the long run of the strategic delta planning, and to a shift of tasks and responsibilities. Thus, implementation of strategic plans often features delays, deviations of agreed plans and unintended outcomes. A key question therefore is how coalition dynamics in (pre-)planning stages influence and are influenced by the coalition dynamics during implementation. The different stages in strategic planning are often studied from either a plan formulation or an implementation perspective, but the connection between the two proves an important bottleneck for strategic planning in deltas. For instance, many building with nature solutions are still in their pilot-phase, and their upscaling can profit from lessons concerning past implementation efforts. The proposed contribution will use the case of the management of the Dutch Haringvliet sluices and the decision ('Kierbesluit') in 2000 to put these sluices ajar, to study the link between the different strategic delta planning stages and the role of the formation and change of actor coalitions herein. With the completion of the Haringvliet dam with outlet sluices in 1970, the Haringvliet estuary of the rivers Rhine and Meuse was closed off from the sea, creating a fresh water lake. This was done to make the Dutch Southwest delta safe from flooding, and had positive effects for agricultural water supply and drinking water, but negative consequences for the ecological quality and biodiversity. In the 1980s environmental awareness increased. To restore natural processes, it was decided in 2000 to put the sluices 'ajar' as a first step towards the strategic long-term vision of tidal restoration and major rehabilitation of the Rhine-Meuse estuary. First planning was to have the Kierbesluit implemented in 2005. However, this has been put off again and again, and since the actual implementation started in 2013, planning is to have the infrastructures ready to start opening the sluices in 2018 - 13 years later. What was supposed to be the first step towards full estuarine recovery has become an end goal itself, with implementing actors strictly focusing on putting the sluices ajar and compensating for fresh water loss, dismissing building with nature possibilities behind the dam. The Advocacy Coalition Framework is used as a starting point for analysis, and will be altered and detailed with insights from implementation literature to identify lessons regarding the role and dynamics of actor coalitions from the planning to implementation stage of strategic delta planning.

  8. Controller evaluation of initial data link en route air traffic control services : mini study 3

    DOT National Transportation Integrated Search

    1991-06-01

    This report documents a Federal Aviation Administration controller evaluation of air traffic control (ATC) Data Link services planned for implementation in the en route ATC system. The main body of the report includes a detailed description of the ob...

  9. Assessment of candidate communications systems and technologies for use with intelligent transportation systems (ITS) : task D/E report

    DOT National Transportation Integrated Search

    1997-11-01

    The Clean Air Act Amendments of 1990 (CAAA) require that states submit State Implementation Plans (SIPs) detailing strategies to improve air quality in nonattainment areas. This analysis first reviews the administrative procedures that states and the...

  10. 40 CFR 51.350 - Applicability.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... applicable areas in detail and, consistent with § 51.372 of this subpart, shall include the legal authority... 40 Protection of Environment 2 2010-07-01 2010-07-01 false Applicability. 51.350 Section 51.350... PREPARATION, ADOPTION, AND SUBMITTAL OF IMPLEMENTATION PLANS Inspection/Maintenance Program Requirements § 51...

  11. Incorporating Argumentation through Forensic Science

    ERIC Educational Resources Information Center

    Wheeler, Lindsay B.; Maeng, Jennifer L.; Smetana, Lara K.

    2014-01-01

    This article outlines how to incorporate argumentation into a forensic science unit using a mock trial. Practical details of the mock trial include: (1) a method of scaffolding students' development of their argument for the trial, (2) a clearly outlined set of expectations for students during the planning and implementation of the mock…

  12. 76 FR 2853 - Approval and Promulgation of Air Quality Implementation Plans; Delaware; Infrastructure State...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-18

    ... technical analysis submitted for parallel-processing by DNREC on December 9, 2010, to address significant... technical analysis submitted by DNREC for parallel-processing on December 9, 2010, to satisfy the... consists of a technical analysis that provides detailed support for Delaware's position that it has...

  13. Standard practices for the implementation of computer software

    NASA Technical Reports Server (NTRS)

    Irvine, A. P. (Editor)

    1978-01-01

    A standard approach to the development of computer program is provided that covers the file cycle of software development from the planning and requirements phase through the software acceptance testing phase. All documents necessary to provide the required visibility into the software life cycle process are discussed in detail.

  14. A combined report for freight information real-time system for transport (FIRST). Part A, final evaluation. Part B, detailed test plans

    DOT National Transportation Integrated Search

    2002-05-30

    The ultimate goal of this evaluation is to identify any benefits in operational efficiency, air quality, and customer satisfaction with the implementation of the FIRST information technology system for the intermodal freight industry at the Port of N...

  15. Indian Solar Cities Programme: An Overview of Major Activities and Accomplishments; Preprint

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kandt, A.

    This paper details the Indian Solar City Programme, provides an overview of one city's Master Plan and implementation progress, describes NREL's support of the Indian Solar City Programme, and outlines synergies and differences between the Indian and American programs including unique challenges and opportunities India is facing.

  16. Updated: SREB States Transform School Accountability with "NCLB" Waivers. Policy Brief

    ERIC Educational Resources Information Center

    Decuir, Erica

    2014-01-01

    This latest brief updates education leaders on the key policies the 13 (Arkansas, Delaware, Florida, Georgia, Kentucky, Louisiana, Maryland, Mississippi, North Carolina, Oklahoma, South Carolina, Tennessee and Virginia) Southern Regional Education Board (SREB) states plan to implement under federal waivers to No Child Left Behind. It details,…

  17. A fast GPU-based Monte Carlo simulation of proton transport with detailed modeling of nonelastic interactions.

    PubMed

    Wan Chan Tseung, H; Ma, J; Beltran, C

    2015-06-01

    Very fast Monte Carlo (MC) simulations of proton transport have been implemented recently on graphics processing units (GPUs). However, these MCs usually use simplified models for nonelastic proton-nucleus interactions. Our primary goal is to build a GPU-based proton transport MC with detailed modeling of elastic and nonelastic proton-nucleus collisions. Using the cuda framework, the authors implemented GPU kernels for the following tasks: (1) simulation of beam spots from our possible scanning nozzle configurations, (2) proton propagation through CT geometry, taking into account nuclear elastic scattering, multiple scattering, and energy loss straggling, (3) modeling of the intranuclear cascade stage of nonelastic interactions when they occur, (4) simulation of nuclear evaporation, and (5) statistical error estimates on the dose. To validate our MC, the authors performed (1) secondary particle yield calculations in proton collisions with therapeutically relevant nuclei, (2) dose calculations in homogeneous phantoms, (3) recalculations of complex head and neck treatment plans from a commercially available treatment planning system, and compared with (GEANT)4.9.6p2/TOPAS. Yields, energy, and angular distributions of secondaries from nonelastic collisions on various nuclei are in good agreement with the (GEANT)4.9.6p2 Bertini and Binary cascade models. The 3D-gamma pass rate at 2%-2 mm for treatment plan simulations is typically 98%. The net computational time on a NVIDIA GTX680 card, including all CPU-GPU data transfers, is ∼ 20 s for 1 × 10(7) proton histories. Our GPU-based MC is the first of its kind to include a detailed nuclear model to handle nonelastic interactions of protons with any nucleus. Dosimetric calculations are in very good agreement with (GEANT)4.9.6p2/TOPAS. Our MC is being integrated into a framework to perform fast routine clinical QA of pencil-beam based treatment plans, and is being used as the dose calculation engine in a clinically applicable MC-based IMPT treatment planning system. The detailed nuclear modeling will allow us to perform very fast linear energy transfer and neutron dose estimates on the GPU.

  18. Space Station Mission Planning System (MPS) development study. Volume 1: Executive summary

    NASA Technical Reports Server (NTRS)

    Klus, W. J.

    1987-01-01

    The basic objective of the Space Station (SS) Mission Planning System (MPS) Development Study was to define a baseline Space Station mission plan and the associated hardware and software requirements for the system. A detailed definition of the Spacelab (SL) payload mission planning process and SL Mission Integration Planning System (MIPS) software was derived. A baseline concept was developed for performing SS manned base payload mission planning, and it was consistent with current Space Station design/operations concepts and philosophies. The SS MPS software requirements were defined. Also, requirements for new software include candidate programs for the application of artificial intelligence techniques to capture and make more effective use of mission planning expertise. A SS MPS Software Development Plan was developed which phases efforts for the development software to implement the SS mission planning concept.

  19. Implementation research: a mentoring programme to improve laboratory quality in Cambodia

    PubMed Central

    Voeurng, Vireak; Sek, Sophat; Song, Sophanna; Vong, Nora; Tous, Chansamrach; Flandin, Jean-Frederic; Confer, Deborah; Costa, Alexandre; Martin, Robert

    2016-01-01

    Abstract Objective To implement a mentored laboratory quality stepwise implementation (LQSI) programme to strengthen the quality and capacity of Cambodian hospital laboratories. Methods We recruited four laboratory technicians to be mentors and trained them in mentoring skills, laboratory quality management practices and international standard organization (ISO) 15189 requirements for medical laboratories. Separately, we trained staff from 12 referral hospital laboratories in laboratory quality management systems followed by tri-weekly in-person mentoring on quality management systems implementation using the LQSI tool, which is aligned with the ISO 15189 standard. The tool was adapted from a web-based resource into a software-based spreadsheet checklist, which includes a detailed action plan and can be used to qualitatively monitor each laboratory’s progress. The tool – translated into Khmer – included a set of quality improvement activities grouped into four phases for implementation with increasing complexity. Project staff reviewed the laboratories’ progress and challenges in weekly conference calls and bi-monthly meetings with focal points of the health ministry, participating laboratories and local partners. We present the achievements in implementation from September 2014 to March 2016. Findings As of March 2016, the 12 laboratories have completed 74–90% of the 104 activities in phase 1, 53–78% of the 178 activities in phase 2, and 18–26% of the 129 activities in phase 3. Conclusion Regular on-site mentoring of laboratories using a detailed action plan in the local language allows staff to learn concepts of quality management system and learn on the job without disruption to laboratory service provision. PMID:27843164

  20. Moses Lake Fishery Restoration Project : FY 1999 Annual Report.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None given

    2000-12-01

    The Moses Lake Project consists of 3 phases. Phase 1 is the assessment of all currently available physical and biological information, the collection of baseline biological data, the formulation of testable hypotheses, and the development of a detailed study plan to test the hypotheses. Phase 2 is dedicated to the implementation of the study plan including data collection, hypotheses testing, and the formulation of a management plan. Phase 3 of the project is the implementation of the management plan, monitoring and evaluation of the implemented recommendations. The project intends to restore the failed recreational fishery for panfish species (black crappie,more » bluegill and yellow perch) in Moses Lake as off site mitigation for lost recreational fishing opportunities for anadromous species in the upper Columbia River. This report summarizes the results of Phase 1 investigations and presents the study plan directed at initiating Phase 2 of the project. Phase 1of the project culminates with the formulation of testable hypotheses directed at investigating possible limiting factors to the production of panfish in Moses Lake. The limiting factors to be investigated will include water quality, habitat quantity and quality, food limitations, competition, recruitment, predation, over harvest, environmental requirements, and the physical and chemical limitations of the system in relation to the fishes.« less

  1. Multi-GPU implementation of a VMAT treatment plan optimization algorithm.

    PubMed

    Tian, Zhen; Peng, Fei; Folkerts, Michael; Tan, Jun; Jia, Xun; Jiang, Steve B

    2015-06-01

    Volumetric modulated arc therapy (VMAT) optimization is a computationally challenging problem due to its large data size, high degrees of freedom, and many hardware constraints. High-performance graphics processing units (GPUs) have been used to speed up the computations. However, GPU's relatively small memory size cannot handle cases with a large dose-deposition coefficient (DDC) matrix in cases of, e.g., those with a large target size, multiple targets, multiple arcs, and/or small beamlet size. The main purpose of this paper is to report an implementation of a column-generation-based VMAT algorithm, previously developed in the authors' group, on a multi-GPU platform to solve the memory limitation problem. While the column-generation-based VMAT algorithm has been previously developed, the GPU implementation details have not been reported. Hence, another purpose is to present detailed techniques employed for GPU implementation. The authors also would like to utilize this particular problem as an example problem to study the feasibility of using a multi-GPU platform to solve large-scale problems in medical physics. The column-generation approach generates VMAT apertures sequentially by solving a pricing problem (PP) and a master problem (MP) iteratively. In the authors' method, the sparse DDC matrix is first stored on a CPU in coordinate list format (COO). On the GPU side, this matrix is split into four submatrices according to beam angles, which are stored on four GPUs in compressed sparse row format. Computation of beamlet price, the first step in PP, is accomplished using multi-GPUs. A fast inter-GPU data transfer scheme is accomplished using peer-to-peer access. The remaining steps of PP and MP problems are implemented on CPU or a single GPU due to their modest problem scale and computational loads. Barzilai and Borwein algorithm with a subspace step scheme is adopted here to solve the MP problem. A head and neck (H&N) cancer case is then used to validate the authors' method. The authors also compare their multi-GPU implementation with three different single GPU implementation strategies, i.e., truncating DDC matrix (S1), repeatedly transferring DDC matrix between CPU and GPU (S2), and porting computations involving DDC matrix to CPU (S3), in terms of both plan quality and computational efficiency. Two more H&N patient cases and three prostate cases are used to demonstrate the advantages of the authors' method. The authors' multi-GPU implementation can finish the optimization process within ∼ 1 min for the H&N patient case. S1 leads to an inferior plan quality although its total time was 10 s shorter than the multi-GPU implementation due to the reduced matrix size. S2 and S3 yield the same plan quality as the multi-GPU implementation but take ∼4 and ∼6 min, respectively. High computational efficiency was consistently achieved for the other five patient cases tested, with VMAT plans of clinically acceptable quality obtained within 23-46 s. Conversely, to obtain clinically comparable or acceptable plans for all six of these VMAT cases that the authors have tested in this paper, the optimization time needed in a commercial TPS system on CPU was found to be in an order of several minutes. The results demonstrate that the multi-GPU implementation of the authors' column-generation-based VMAT optimization can handle the large-scale VMAT optimization problem efficiently without sacrificing plan quality. The authors' study may serve as an example to shed some light on other large-scale medical physics problems that require multi-GPU techniques.

  2. Theoretical orientations in environmental planning: An inquiry into alternative approaches

    NASA Astrophysics Data System (ADS)

    Briassoulis, Helen

    1989-07-01

    In the process of devising courses of action to resolve problems arising at the society-environment interface, a variety of planning approaches are followed, whose adoption is influenced by—among other things—the characteristics of environmental problems, the nature of the decision-making context, and the intellectual traditions of the disciplines contributing to the study of these problems. This article provides a systematic analysis of six alternative environmental planning approaches—comprehensive/rational, incremental, adaptive, contingency, advocacy, and participatory/consensual. The relative influence of the abovementioned factors is examined, the occurrence of these approaches in real-world situations is noted, and their environmental soundness and political realism is evaluated. Because of the disparity between plan formulation and implementation and between theoretical form and empirical reality, a synthetic view of environmental planning approaches is taken and approaches in action are identified, which characterize the totality of the planning process from problem definition to plan implementation, as well as approaches in the becoming, which may be on the horizon of environmental planning of tomorrow. The suggested future research directions include case studies to verify and detail the presence of the approaches discussed, developing measures of success of a given approach in a given decision setting, and an intertemporal analysis of environmental planning approaches.

  3. Strategic plan for bioenergy research, 1998--2003, the Canadian Forest Service five-year plan: Implementing the Canadian bioenergy research strategy (in English;French)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1998-10-01

    This document supersedes the previous one, taking into account changes that have taken place in the CFS Science and Technology (S and T) program structure and organization, and in the structure of the Program of Energy Research and Development, the source of funding for CFS bioenergy research. It explains the rationale and overall objective for the bioenergy research program and briefly reviews the accomplishments to date. It indicates the planning context within which the program operates, states the specific objectives for the period of the plan, and details the strategic priorities developed for this period. Finally, it outlines the implementationmore » process for the plan.« less

  4. Intervention mapping: a process for developing theory- and evidence-based health education programs.

    PubMed

    Bartholomew, L K; Parcel, G S; Kok, G

    1998-10-01

    The practice of health education involves three major program-planning activities: needs assessment, program development, and evaluation. Over the past 20 years, significant enhancements have been made to the conceptual base and practice of health education. Models that outline explicit procedures and detailed conceptualization of community assessment and evaluation have been developed. Other advancements include the application of theory to health education and promotion program development and implementation. However, there remains a need for more explicit specification of the processes by which one uses theory and empirical findings to develop interventions. This article presents the origins, purpose, and description of Intervention Mapping, a framework for health education intervention development. Intervention Mapping is composed of five steps: (1) creating a matrix of proximal program objectives, (2) selecting theory-based intervention methods and practical strategies, (3) designing and organizing a program, (4) specifying adoption and implementation plans, and (5) generating program evaluation plans.

  5. Using Geographical Information Systems (GIS) as an instrument of water resource management: a case study from a GIS-based Water Safety Plan in Germany.

    PubMed

    Wienand, I; Nolting, U; Kistemann, T

    2009-01-01

    Following international developments and the new WHO Drinking Water Guidelines (WHO 2004) a process-orientated concept for risk, monitoring and incident management has been developed and implemented in this study. The concept will be reviewed with special consideration for resource protection (first barrier of the multi-barrier system) and in turn, for the Water Safety Plan (WSP) which adequately considers-beyond the current framework of legal requirements-possible new hygienic-microbiologically relevant risks (especially emerging pathogens) for the drinking water supply. The development of a WSP within the framework of risk, monitoring and incident management includes the application of Geographical Information Systems (GIS). In the present study, GIS was used for visualization and spatial analysis in decisive steps in the WSP. The detailed process of GIS-supported implementation included the identification of local participants and their tasks and interactions as an essential part of risk management. A detailed ecological investigation of drinking water conditions in the catchment area was conducted in addition to hazard identification, risk assessment and the monitoring of control measures. The main task of our study was to find out in which steps of the WSP the implementation of GIS could be integrated as a useful, and perhaps even an essential tool.

  6. A report on NASA software engineering and Ada training requirements

    NASA Technical Reports Server (NTRS)

    Legrand, Sue; Freedman, Glenn B.; Svabek, L.

    1987-01-01

    NASA's software engineering and Ada skill base are assessed and information that may result in new models for software engineering, Ada training plans, and curricula are provided. A quantitative assessment which reflects the requirements for software engineering and Ada training across NASA is provided. A recommended implementation plan including a suggested curriculum with associated duration per course and suggested means of delivery is also provided. The distinction between education and training is made. Although it was directed to focus on NASA's need for the latter, the key relationships to software engineering education are also identified. A rationale and strategy for implementing a life cycle education and training program are detailed in support of improved software engineering practices and the transition to Ada.

  7. Identification, assessment, and control of hazards in water supply: experiences from Water Safety Plan implementations in Germany.

    PubMed

    Mälzer, H-J; Staben, N; Hein, A; Merkel, W

    2010-01-01

    According to the recommendations of the World Health Organization (WHO) for Water Safety Plans (WSP), a Technical Risk Management was developed, which considers standard demands in drinking water treatment in Germany. It was already implemented at several drinking water treatment plants of different size and treatment processes in Germany. Hazards affecting water quality, continuity, and the reliability of supply from catchment to treatment and distribution could be identified by a systematic approach, and suitable control measures were defined. Experiences are presented by detailed examples covering methods, practical consequences, and further outcomes. The method and the benefits for the water suppliers are discussed and an outlook on the future role of WSPs in German water supply is given.

  8. Implementing an effective organization and governance structure for a radiology practice.

    PubMed

    Muroff, Lawrence R

    2004-01-01

    Radiology practices that are well organized and effectively governed have a competitive advantage. Decisions are made rapidly, actions are taken decisively and in accordance with established policy, and each group member has a responsibility for practice building. Such groups are perceived by their peers, hospital administration, and community business leaders to be both formidable and effective. This paper details the mechanisms that facilitate planning for and implementing an efficient practice organization and governance structure. The tasks of group leaders are defined, as are the committees necessary for appropriate action. The integral roles of a mission statement and a business plan are discussed. Practices adopting the suggested organizational structure will be best positioned to survive in both good times and bad.

  9. Implementing Classification on a Munitions Response Project

    DTIC Science & Technology

    2011-12-01

    Detection Dig List  IVS/Seed Site Planning Decisions Dig All  Anomalies Site Characterization Implementing Classification on a Munitions Response...Details ● Seed emplacement ● EM61-MK2 detection survey  RTK GPS ● Select anomalies for further investigation ● Collect cued data using MetalMapper...5.2 mV in channel 2  938 anomalies selected ● All QC seeds detected using this threshold  Some just inside the 60-cm halo ● IVS reproducibility

  10. Implementation of a patient-held urinary catheter passport to improve catheter management, by prompting for early removal and enhancing patient compliance.

    PubMed

    Codd, Jane

    2014-05-01

    Over the past few years a number of strategic initiatives to improve catheter management and reduce associated infections have been introduced. This paper details the introduction of a patient-held catheter passport and an improved documentation record using the PDSA (Plan, Do, Study, Act) cycle of change implementation in one large acute National Health Service (NHS) trust and local health economy (NHS Institute for Innovation and Improvement, 2008).

  11. Implementation of a patient-held urinary catheter passport to improve catheter management, by prompting for early removal and enhancing patient compliance

    PubMed Central

    2013-01-01

    Over the past few years a number of strategic initiatives to improve catheter management and reduce associated infections have been introduced. This paper details the introduction of a patient-held catheter passport and an improved documentation record using the PDSA (Plan, Do, Study, Act) cycle of change implementation in one large acute National Health Service (NHS) trust and local health economy (NHS Institute for Innovation and Improvement, 2008) PMID:28989364

  12. 76 FR 23609 - New Proposed Collection; Comment Request; Biospecimen and Physical Measures Formative Research...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-27

    ... has obtained an OMB generic clearance to conduct survey and instrument design and administration... conduct the detailed preparation needed for a study of this size and complexity, the NCS was designed to... methodological studies conducted during the Vanguard phase will inform the implementation and analysis plan for...

  13. Guidelines for Conducting and Reporting Mixed Research in the Field of Counseling and beyond

    ERIC Educational Resources Information Center

    Leech, Nancy L.; Onwuegbuzie, Anthony J.

    2010-01-01

    This article provides guidelines for conducting, reporting, and evaluating mixed research studies in 3 sections: research formulation, research planning, and research implementation. To date, no such guidelines are available. Detailed descriptions of each subsection are included. The authors hope that these standards assist researchers from the…

  14. 78 FR 47253 - Approval and Promulgation of Air Quality Implementation Plans; Maine; Oxides of Nitrogen...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-05

    ...-hour ozone standard in any area in the OTR. The State's submittals include detailed technical analyses... areas in the OTR. The State's technical analyses rely on several different techniques used to analyze... Maine's requests? Based on the ME DEP's technical analyses discussed above, EPA believes that the State...

  15. Simulation-based modeling of building complexes construction management

    NASA Astrophysics Data System (ADS)

    Shepelev, Aleksandr; Severova, Galina; Potashova, Irina

    2018-03-01

    The study reported here examines the experience in the development and implementation of business simulation games based on network planning and management of high-rise construction. Appropriate network models of different types and levels of detail have been developed; a simulation model including 51 blocks (11 stages combined in 4 units) is proposed.

  16. 77 FR 44198 - Approval and Promulgation of Implementation Plans; State of Florida: New Source Review...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-27

    ....e., lung disease, decreased lung function asthma attacks and certain cardiovascular issues... with heart and lung diseases. For more details regarding health effects and PM 2.5 see EPA's Web site...'' and ``minor source baseline date'' (including trigger dates) to establish the PM 2.5 NAAQS specific...

  17. 76 FR 48207 - Federal Implementation Plans: Interstate Transport of Fine Particulate Matter and Ozone and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-08

    ... Problems and NAAQS Addressed 1. Air Quality Problems and NAAQS Addressed 2. FIP Authority for Each State... resolve nonattainment or maintenance problems at downwind state receptors. Downwind states also have... are fossil fuel-fired boilers and turbines producing electricity for sale, as detailed in section VII...

  18. Living on a Cotton Farm: Mexican American Life in Texas.

    ERIC Educational Resources Information Center

    Black, Mary S.

    This packet of six lesson plans highlights Mexican-American life on a Texas cotton farm in the early 20th century. Each lesson provides a lesson overview; states educational objectives; cites materials needed; details the procedure for classroom implementation; offers a closure activity; and suggests an extension activity. The packet is divided…

  19. Space industrialization. Volume 3: Space industrialization implementation concepts

    NASA Technical Reports Server (NTRS)

    1978-01-01

    Methods for selecting the most viable program options were examined along with techniques for hardware development. Several separate program options were defined, and future plans for space exploitation were reviewed. Hardware elements in various sectors of space are discussed in detail to provide a definition for the major functional elements and operations.

  20. The Preservation and Restoration of Paper Records and Books: A RAMP Study with Guidelines.

    ERIC Educational Resources Information Center

    Crespo, Carmen; Vinas, Vicente

    Intended for archivists and librarians, especially in developing countries, this study details the systems and principles important in planning and implementing a program for the preservation and restoration of paper documents and books. The importance of environmental (external) causes and effects of paper deterioration are discussed as well as…

  1. Teaching Intercultural Competence across the Age Range: From Theory to Practice

    ERIC Educational Resources Information Center

    Wagner, Manuela, Ed.; Perugini, Dorie Conlon, Ed.; Byram, Michael, Ed.

    2017-01-01

    This ground-breaking book is the first to describe in detail how teachers, supported by university educators and education advisers, might plan and implement innovative ideas based on sound theoretical foundations. Focusing on the teaching and learning of intercultural communicative competence in foreign language classrooms in the USA, the authors…

  2. TQM in a test environment

    NASA Technical Reports Server (NTRS)

    Chambers, Gary D.; King, Elizabeth A.; Oleson, Keith

    1992-01-01

    In response to the changing aerospace economic climate, Martin Marietta Astronautics Group (MMAG) has adopted a Total Quality Management (TQM) philosophy to maintain a competitive edge. TQM emphasizes continuous improvement of processes, motivation to improve from within, cross-functional involvement, people empowerment, customer satisfaction, and modern process control techniques. The four major initiatives of TQM are Product Excellence, Manufacturing Resource Planning (MRP II), People Empowerment, and Subcontract Management. The Defense Space and Communications (DS&C) Test Lab's definition and implementation of the MRP II and people empowerment initiatives within TQM are discussed. The application of MRP II to environmental test planning and operations processes required a new and innovative approach. In an 18 month span, the test labs implemented MRP II and people empowerment and achieved a Class 'A' operational status. This resulted in numerous benefits, both tangible and intangible, including significant cost savings and improved quality of life. A detailed description of the implementation process and results are addressed.

  3. TQM in a test environment

    NASA Astrophysics Data System (ADS)

    Chambers, Gary D.; King, Elizabeth A.; Oleson, Keith

    1992-11-01

    In response to the changing aerospace economic climate, Martin Marietta Astronautics Group (MMAG) has adopted a Total Quality Management (TQM) philosophy to maintain a competitive edge. TQM emphasizes continuous improvement of processes, motivation to improve from within, cross-functional involvement, people empowerment, customer satisfaction, and modern process control techniques. The four major initiatives of TQM are Product Excellence, Manufacturing Resource Planning (MRP II), People Empowerment, and Subcontract Management. The Defense Space and Communications (DS&C) Test Lab's definition and implementation of the MRP II and people empowerment initiatives within TQM are discussed. The application of MRP II to environmental test planning and operations processes required a new and innovative approach. In an 18 month span, the test labs implemented MRP II and people empowerment and achieved a Class 'A' operational status. This resulted in numerous benefits, both tangible and intangible, including significant cost savings and improved quality of life. A detailed description of the implementation process and results are addressed.

  4. SAVY-4000 Surveillance and Life Extension Program Fiscal Year 2013 Annual Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Stone, Timothy A.; Blair, Michael W.; Weis, Eric

    2014-03-03

    The Packaging Surveillance Program section of the DOE M441.1-1 /sup>1, Nuclear Material Packaging Manual (DOE, 2008) requires DOE contractors to “ensure that a surveillance program is established and implemented to ensure the nuclear material storage package continues to meet its design criteria.” In order to ensure continuing safe storage of nuclear material and the maximization of risk reduction, TA-55 has established a Surveillance Program to ensure storage container integrity for operations within its specified design life. The LANL SAVY-4000 Field Surveillance Plan2 defines the near-term field surveillance plan for SAVY-4000 containers as required by the Manual. A long-term surveillance planmore » will be established based on the results of the first several years of surveillance and the results of the lifetime extension studies as defined in the Accelerated Aging Plan3. This report details progress in positioning the Surveillance Program for successful implementation in FY14 and status of the Design Life Extension Program in terms of its implementation and data collection for FY13.« less

  5. The HAL 9000 Space Operating System Real-Time Planning Engine Design and Operations Requirements

    NASA Technical Reports Server (NTRS)

    Stetson, Howard; Watson, Michael D.; Shaughnessy, Ray

    2012-01-01

    In support of future deep space manned missions, an autonomous/automated vehicle, providing crew autonomy and an autonomous response planning system, will be required due to the light time delays in communication. Vehicle capabilities as a whole must provide for tactical response to vehicle system failures and space environmental effects induced failures, for risk mitigation of permanent loss of communication with Earth, and for assured crew return capabilities. The complexity of human rated space systems and the limited crew sizes and crew skills mix drive the need for a robust autonomous capability on-board the vehicle. The HAL 9000 Space Operating System[2] designed for such missions and space craft includes the first distributed real-time planning / re-planning system. This paper will detail the software architecture of the multiple planning engine system, and the interface design for plan changes, approval and implementation that is performed autonomously. Operations scenarios will be defined for analysis of the planning engines operations and its requirements for nominal / off nominal activities. An assessment of the distributed realtime re-planning system, in the defined operations environment, will be provided as well as findings as it pertains to the vehicle, crew, and mission control requirements needed for implementation.

  6. StarPlan: A model-based diagnostic system for spacecraft

    NASA Technical Reports Server (NTRS)

    Heher, Dennis; Pownall, Paul

    1990-01-01

    The Sunnyvale Division of Ford Aerospace created a model-based reasoning capability for diagnosing faults in space systems. The approach employs reasoning about a model of the domain (as it is designed to operate) to explain differences between expected and actual telemetry; i.e., to identify the root cause of the discrepancy (at an appropriate level of detail) and determine necessary corrective action. A development environment, named Paragon, was implemented to support both model-building and reasoning. The major benefit of the model-based approach is the capability for the intelligent system to handle faults that were not anticipated by a human expert. The feasibility of this approach for diagnosing problems in a spacecraft was demonstrated in a prototype system, named StarPlan. Reasoning modules within StarPlan detect anomalous telemetry, establish goals for returning the telemetry to nominal values, and create a command plan for attaining the goals. Before commands are implemented, their effects are simulated to assure convergence toward the goal. After the commands are issued, the telemetry is monitored to assure that the plan is successful. These features of StarPlan, along with associated concerns, issues and future directions, are discussed.

  7. The development of a Flight Test Engineer's Workstation for the Automated Flight Test Management System

    NASA Technical Reports Server (NTRS)

    Tartt, David M.; Hewett, Marle D.; Duke, Eugene L.; Cooper, James A.; Brumbaugh, Randal W.

    1989-01-01

    The Automated Flight Test Management System (ATMS) is being developed as part of the NASA Aircraft Automation Program. This program focuses on the application of interdisciplinary state-of-the-art technology in artificial intelligence, control theory, and systems methodology to problems of operating and flight testing high-performance aircraft. The development of a Flight Test Engineer's Workstation (FTEWS) is presented, with a detailed description of the system, technical details, and future planned developments. The goal of the FTEWS is to provide flight test engineers and project officers with an automated computer environment for planning, scheduling, and performing flight test programs. The FTEWS system is an outgrowth of the development of ATMS and is an implementation of a component of ATMS on SUN workstations.

  8. Joint operations planning for space surveillance missions on the MSX satellite

    NASA Technical Reports Server (NTRS)

    Stokes, Grant; Good, Andrew

    1994-01-01

    The Midcourse Space Experiment (MSX) satellite, sponsored by BMDO, is intended to gather broad-band phenomenology data on missiles, plumes, naturally occurring earthlimb backgrounds and deep space backgrounds. In addition the MSX will be used to conduct functional demonstrations of space-based space surveillance. The JHU/Applied Physics Laboratory (APL), located in Laurel, MD, is the integrator and operator of the MSX satellite. APL will conduct all operations related to the MSX and is charged with the detailed operations planning required to implement all of the experiments run on the MSX except the space surveillance experiments. The non-surveillance operations are generally amenable to being defined months ahead of time and being scheduled on a monthly basis. Lincoln Laboratory, Massachusetts Institute of Technology (LL), located in Lexington, MA, is the provider of one of the principle MSX instruments, the Space-Based Visible (SBV) sensor, and the agency charged with implementing the space surveillance demonstrations on the MSX. The planning timelines for the space surveillance demonstrations are fundamentally different from those for the other experiments. They are generally amenable to being scheduled on a monthly basis, but the specific experiment sequence and pointing must be refined shortly before execution. This allocation of responsibilities to different organizations implies the need for a joint mission planning system for conducting space surveillance demonstrations. This paper details the iterative, joint planning system, based on passing responsibility for generating MSX commands for surveillance operations from APL to LL for specific scheduled operations. The joint planning system, including the generation of a budget for spacecraft resources to be used for surveillance events, has been successfully demonstrated during ground testing of the MSX and is being validated for MSX launch within the year. The planning system developed for the MSX forms a model possibly applicable to developing distributed mission planning systems for other multi-use satellites.

  9. Developments in Assisting Countries in Implementing the IAEA Additional Protocol

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Killinger, Mark H.; Hansen, Linda H.; Cain, Ronald A.

    In 2008, the U.S. Department of Energy (DOE) began assisting selected non-nuclear weapon states in planning and preparing for implementation of the International Atomic Energy Agency’s Additional Protocol (AP). Since then, the AP international implementation program has contributed to the substantial progress made by Vietnam, Thailand, Iraq, and Malaysia in preparing for entry-into-force of the AP. An overall engagement plan has been developed with components designed to train government AP implementing agencies, inform policy makers, conduct outreach to industry and universities, make AP reporting software available and useful, and plan a detailed approach for implementing the declaration and complementary accessmore » provisions of the AP. DOE recently began collaborating with Indonesia, which has already entered the AP into force, requiring a second method of engagement somewhat different from that taken with countries that have not entered the AP into force. The AP international implementation program, administered by the International Nuclear Safeguards and Engagement Program, is working more closely with DOE’s International Nonproliferation Export Control Program to ensure countries are aware of and prepared to implement the export/import provisions of the AP. As the AP implementation program matures and helps move countries closer to entry-into-force or improved AP implementation, it is identifying characteristics of a country’s “end-state” that indicate that DOE assistance is no longer required. The U.S. AP Implementation Act and Senate Resolution of Ratification require the Administration to report annually to Congress on measures taken to achieve the adoption of the AP in non-nuclear weapon states. DOE’s AP international implementation program is a significant part of these measures. This paper describes recent developments to increase the scope and effectiveness of the program.« less

  10. Integration of Palliative Care Principles into the Ongoing Care of Children with Cancer: Individualized Care Planning and Coordination

    PubMed Central

    Baker, Justin N; Hinds, Pamela S; Spunt, Sheri L; Barfield, Raymond C; Allen, Caitlin; Powell, Brent C; Anderson, Lisa H; Kane, Javier R

    2008-01-01

    Synopsis The Individualized Care Planning and Coordination Model is designed to integrate palliative care principles and practices into the ongoing care of children with cancer. Application of the model helps clinicians to generate a comprehensive individualized care plan that is implemented through Individualized Care Coordination processes as detailed here. Clinicians’ strong desire to provide compassionate, competent and sensitive care to the seriously ill child and the child’s family can be effectively translated into clinical practice through these processes. “To cure sometimes, to relieve often, to comfort always -- this is our work.” Author Unknown PMID:18242323

  11. Space station MSFC-DPD-235/DR no. MA-05 phase C/D program development plan. Volume 2: Phase C/D, programmatic requirements

    NASA Technical Reports Server (NTRS)

    1971-01-01

    The design plan requirements define the design implementation and control requirements for Phase C/D of the Modular Space Station Project and specifically address the Initial Space Station phase of the Space Station Program (modular). It is based primarily on the specific objective of translating the requirements of the Space Station Program, Project, Interface, and Support Requirements and preliminary contract end x item specifications into detail design of the operational systems which comprise the initial space station. This document is designed to guide aerospace contractors in the planning and bidding for Phase C/D.

  12. NASA: 1986 long-range program plan

    NASA Technical Reports Server (NTRS)

    1985-01-01

    For the years beyond FY 1986, the plan consists of activities that are technologically possible and considered to be in the national interest. Its implementation will ensure logical and continued progress in reaching the Nation's goals in aeronautics and space, consistent with the responsibilities assigned NASA by the National Aeronautics and Space Act of 1958, as amended. The major features of the programs are described in detail and the nature of the aeronautics and space programs beyond the year 2000 are projected. The abbreviations and acronyms that appear in this report are listed. The status of NASA's plans are summarized at the time of its preparation.

  13. Taking a unified approach to teaching and implementing quality improvements across multiple residency programs: the Atlantic Health experience.

    PubMed

    Daniel, Donna M; Casey, Donald E; Levine, Jeffrey L; Kaye, Susan T; Dardik, Raquel B; Varkey, Prathibha; Pierce-Boggs, Kimberly

    2009-12-01

    The Accreditation Council for Graduate Medical Education recently emphasized the importance of systems-based practice and systems-based learning; however, successful models of collaborative quality improvement (QI) initiatives in residency training curricula are not widely available. Atlantic Health successfully conceptualized and implemented a QI collaborative focused on medication safety across eight residency training programs representing 219 residents. During a six-month period, key faculty and resident leaders from 8 (of 10) Atlantic Health residency training programs participated in three half-day collaborative learning sessions focused on improving medication reconciliation. Each session included didactic presentations from a multidisciplinary team of clinical experts as well as the application of principles that identified challenges, barriers, and solutions to QI initiatives. The learning sessions emphasized the fundamental principles of medication reconciliation, its critical importance as a vital part of patient handoff in all health care settings, and the challenges of achieving successful medication reconciliation improvement in light of work hours restrictions and patient loads. Each residency program developed a detailed implementation and measurement plan for individual "action learning" projects, using the Plan-Do-Study-Act method of improvement. Each program then implemented its QI project, and expert faculty (e.g., physicians, nurses, pharmacists, QI staff) provided mentoring between learning sessions. Several projects resulted in permanent changes in medication reconciliation processes, which were then adopted by other programs. The structure, process, and outcomes of this effort are described in detail.

  14. Contextualized IT Education in Tanzania: Beyond Standard IT Curricula

    ERIC Educational Resources Information Center

    Tedre, Matti; Bangu, Nicholas; Nyagava, Seth I.

    2009-01-01

    Tumaini University at Iringa, Tanzania, started a new B.Sc. program in IT in 2007. In the course of planning and implementation of the program, we found out that standard ACM/IEEE IT curricula are not adequate for an IT program in a poor, developing country. The standard curricula describe, in detail, the competences that IT specialists in…

  15. Fire Safety Trianing in Health Care Institutions.

    ERIC Educational Resources Information Center

    American Hospital Association, Chicago, IL.

    The manual details the procedures to be followed in developing and implementing a fire safety plan. The three main steps are first, to organize; second, to set up a procedure and put it in writing; and third, to train and drill employees and staff. Step 1 involves organizing a safety committee, appointing a fire marshall, and seeking help from…

  16. Enhancing Children's Growth and Development. Training Guides for the Head Start Learning Community.

    ERIC Educational Resources Information Center

    Aspen Systems Corp., Rockville, MD.

    This training guide is designed to enhance the skills of Head Start education staff in applying knowledge of how children grow and develop to planning, implementing, and evaluating activities and experiences in the center, at home, and during group socialization sessions. Each of the guide's modules details module outcomes, key concepts, and…

  17. Senior Citizens Can Be Physically Fit: Hints for a Successfully Developed Program.

    ERIC Educational Resources Information Center

    Sandlin, Betty; Sutherland, Mary S.

    Suggestions are given in this paper for developing a physical fitness program for senior citizens. Discussed in detail are surveying community interest, program planning and implementation, and program evaluation. It is pointed out that fitness programs can modify many of the physical and mental changes of aging. It is emphasized that the program…

  18. 78 FR 44884 - Approval and Promulgation of Air Quality Implementation Plans; West Virginia; Update to Materials...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-25

    ... reference Federally- approved SIPs, as a result of consultations between EPA and the Office of the Federal...'' format are discussed in further detail in the May 22, 1997 Federal Register document. On February 10... under the ``good cause'' exemption in section 553(b)(3)(B) of the Administrative Procedures Act (APA...

  19. 76 FR 71881 - Approval and Promulgation of Air Quality Implementation Plans; Virginia; Update to Materials...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-21

    ... reference Federally-approved SIPs, as a result of consultations between EPA and the Office of the Federal...'' format are discussed in further detail in the May 22, 1997 Federal Register document. On April 21, 2000...) Correcting the date format in the ``State effective date'' column for Global Stone Chemstone Corporation. D...

  20. 75 FR 66699 - Lacey Act Implementation Plan; Definitions for Exempt and Regulated Articles

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-29

    .../component/main?main=DocketDetail&d=APHIS-2009-0018 to submit or view comments and to view supporting and... comment to Docket No. APHIS-2009-0018, Regulatory Analysis and Development, PPD, APHIS, Station 3A-03.8... Policy Analysis and Support, PPQ, APHIS, 4700 River Road Unit 60, Riverdale, MD 20737-1231; (301) 734...

  1. Alternative Fuels Data Center: Raleigh, North Carolina, Paves the Way for

    Science.gov Websites

    of North Carolina at Chapel Hill. It's no surprise that Raleigh is a leader in PEV deployment as well charging on the electrical grid; implementing a three-year load research project that included installing requirements, including load calculations and a detailed plan review. For more information, visit the city's

  2. 77 FR 3933 - Approval and Promulgation of Air Quality Implementation Plans; Oklahoma; Infrastructure...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-26

    ... public inspection in the Region 6 Freedom of Information Act (FOIA) Review Room between the hours of 8:30... document wherever ``we,'' ``us,'' or ``our'' is used, we mean the EPA. I. Background II. Final Action III. Statutory and Executive Order Reviews I. Background The background for today's action is discussed in detail...

  3. How to apply Y2K lessons to patient confidentiality.

    PubMed

    2001-04-01

    Despite current debate over the details of implementing the privacy portion of the Health Insurance Portability and Accountability Act (HIPAA) of 1996, experts say quality managers should continue their planning to comply with the new law. One way to prepare for the sweeping new mandates is to apply the lessons of Y2K to HIPAA.

  4. INFORMATION, STANDARDS, AND SPECIFICATIONS FOR EQUIPMENT, MATERIALS, AND MINOR REMODELING FOR MODERN FOREIGN LANGUAGES (REVISED).

    ERIC Educational Resources Information Center

    Illinois State Office of the Superintendent of Public Instruction, Springfield.

    THE INFORMATION INCLUDED IN THIS VERY DETAILED DOCUMENT IS INTENDED FOR TEACHERS AND ADMINISTRATORS PLANNING AND IMPLEMENTING PROGRAMS TO IMPROVE FOREIGN LANGUAGE INSTRUCTION. THE SPECIFICATIONS PRESENTED ARE MINIMUM, BUT THEY MEET THE REQUIREMENTS UNDER THE PROVISIONS OF TITLE III, NDEA. THE FIRST PART OUTLINES PROCEDURES FOR THE SELECTION AND…

  5. 78 FR 41752 - Approval and Promulgation of Air Quality Implementation Plans; Ohio; Redesignation of the Ohio...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-11

    ... specific examples to illustrate your concerns, and suggest alternatives. 7. Explain your views as clearly... requirement to submit the section 172(c)(9) contingency measures is not applicable for purposes of... demonstrates maintenance of the NAAQS without part D NSR. A detailed rationale for this view is described in a...

  6. 78 FR 48087 - Approval and Promulgation of Air Quality Implementation Plans; Ohio; Redesignation of the Canton...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-07

    ... specific examples to illustrate your concerns, and suggest alternatives. 7. Explain your views as clearly... 172(c)(9) contingency measures is not applicable for purposes of redesignation. Id. Section 172(c)(3... area demonstrates maintenance of the NAAQS without part D NSR. A detailed rationale for this view is...

  7. Planning Multitechnology Access Networks with Performance Constraints

    NASA Astrophysics Data System (ADS)

    Chamberland, Steven

    Considering the number of access network technologies and the investment needed for the “last mile” of a solution, in today’s highly competitive markets, planning tools are crucial for the service providers to optimize the network costs and accelerate the planning process. In this paper, we propose to tackle the problem of planning access networks composed of four technologies/architectures: the digital subscriber line (xDSL) technologies deployed directly from the central office (CO), the fiber-to-the-node (FTTN), the fiber-to-the-micro-node (FTTn) and the fiber-to-the-premises (FTTP). A mathematical programming model is proposed for this planning problem that is solved using a commercial implementation of the branch-and-bound algorithm. Next, a detailed access network planning example is presented followed by a systematic set of experiments designed to assess the performance of the proposed approach.

  8. Underground storage tank management plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1994-09-01

    The Underground Storage Tank (UST) Management Program at the Oak Ridge Y-12 Plant was established to locate UST systems in operation at the facility, to ensure that all operating UST systems are free of leaks, and to establish a program for the removal of unnecessary UST systems and upgrade of UST systems that continue to be needed. The program implements an integrated approach to the management of UST systems, with each system evaluated against the same requirements and regulations. A common approach is employed, in accordance with Tennessee Department of Environment and Conservation (TDEC) regulations and guidance, when corrective actionmore » is mandated. This Management Plan outlines the compliance issues that must be addressed by the UST Management Program, reviews the current UST inventory and compliance approach, and presents the status and planned activities associated with each UST system. The UST Management Plan provides guidance for implementing TDEC regulations and guidelines for petroleum UST systems. (There are no underground radioactive waste UST systems located at Y-12.) The plan is divided into four major sections: (1) regulatory requirements, (2) implementation requirements, (3) Y-12 Plant UST Program inventory sites, and (4) UST waste management practices. These sections describe in detail the applicable regulatory drivers, the UST sites addressed under the Management Program, and the procedures and guidance used for compliance with applicable regulations.« less

  9. DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    In the Bear Creek Valley Watershed Remedial Investigation, the Boneyard/Burnyard was identified as the source of the largest releases of uranium into groundwater and surface water in Bear Creek Valley. The proposed action for remediation of this site is selective excavation and removal of source material and capping of the remainder of the site. The schedule for this action has been accelerated so that this is the first remedial action planned to be implemented in the Bear Creek Valley Record of Decision. Additional data needs to support design of the remedial action were identified at a data quality objectives meetingmore » held for this project. Sampling at the Boneyard/Burnyard will be conducted through the use of a phased approach. Initial or primary samples will be used to make in-the-field decisions about where to locate follow-up or secondary samples. On the basis of the results of surface water, soil, and groundwater analysis, up to six test pits will be dug. The test pits will be used to provide detailed descriptions of source materials and bulk samples. This document sets forth the requirements and procedures to protect the personnel involved in this project. This document also contains the health and safety plan, quality assurance project plan, waste management plan, data management plan, implementation plan, and best management practices plan for this project as appendices.« less

  10. Nine steps towards a better water meter management.

    PubMed

    Arregui, F J; Soriano, J; Cabrera, E; Cobacho, R

    2012-01-01

    The paper provides a comprehensive perspective of the critical aspects to be taken into account when planning the long-term management of water meters in a utility. In order to facilitate their quick understanding and practical implementation, they have been structured into nine steps. Ranging from an initial audit up to the final periodic meter replacement planning, these steps cover three aspects of the problem - field work, laboratory work and management tasks; and each one is developed in detail paying attention to the particular data needed and noting the practical outcome it will yield.

  11. Emissions and new technology programs for conventional spark-ignition aircraft engines

    NASA Technical Reports Server (NTRS)

    Wintucky, W. T.

    1976-01-01

    A long-range technology plan in support of general aviation engines was formulated and is being implemented at the Lewis Research Center. The overall program was described, and that part of the program that represents the in-house effort at Lewis was presented in detail. Three areas of government and industry effort involving conventional general-aviation piston engines were part of a coordinated overall plan: (1) FAA/NASA joint program, (2) NASA contract exhaust emissions pollution reduction program, and (3) NASA in-house emissions reduction and new technology program.

  12. Hypergol Maintenance Facility Hazardous Waste South Staging Areas, SWMU 070

    NASA Technical Reports Server (NTRS)

    Wilson, Deborah M.; Miller, Ralinda R.

    2015-01-01

    The purpose of this CMI Year 9 AGWMR is to present the actions taken and results obtained during the ninth year of implementation of Corrective Measures (CM) at HMF. Groundwater monitoring activities were conducted in accordance with the CMI Work Plan (Tetra Tech, 2005a) and CMI Site-Specific Safety and Health Plan (Tetra Tech, 2005b). Groundwater monitoring activities detailed in this Year 9 report include pre-startup sampling in February 2014(prior to restarting the air sparging system) and quarterly performance monitoring in March, July, and September 2014.

  13. Alvin expeditionary hotline

    NASA Astrophysics Data System (ADS)

    This note is call for dive requests, coordinated to the extent practical, from those scientists interested in opportunities for an Alvin/Atlantis II expedition to some remote area. In an effort to facilitate planning for Alvin and to help focus the attention of investigators with diverse scientific interests in remote areas, Feenan Jennings of Texas A & M University, College Station, who chairs the University-National Oceanographic Laboratory System's (UNOLS') Alvin Review Committee (ARC), has announced establishment of an Alvin planning bulletin board on electronic mail. The bulletin board, ALVIN.PLANNING, is to help inform potential users of community interest in conducting Alvin/Atlantis II research projects, especially those involving expeditions to remote areas. ALVIN.PLANNING will be implemented early in 1990. Notice and further details will be broadcast throughout the ocean community.

  14. Space Station Mission Planning Study (MPS) development study. Volume 3: Software development plan

    NASA Technical Reports Server (NTRS)

    Klus, W. L.

    1987-01-01

    A software development plan is presented for the definition, design, and implementation of the Space Station (SS) Payload Mission Planning System (MPS). This plan is an evolving document and must be updated periodically as the SS design and operations concepts as well as the SS MPS concept evolve. The major segments of this plan are as follows: an overview of the SS MPS and a description of its required capabilities including the computer programs identified as configurable items with an explanation of the place and function of each within the system; an overview of the project plan and a detailed description of each development project activity breaking each into lower level tasks where applicable; identification of the resources required and recommendations for the manner in which they should be utilized including recommended schedules and estimated manpower requirements; and a description of the practices, standards, and techniques recommended for the SS MPS Software (SW) development.

  15. Additional cash incentive within a conditional cash transfer scheme: a 'controlled before and during' design evaluation study from India.

    PubMed

    Lahariya, Chandrakant; Mishra, Ashok; Nandan, Deoki; Gautam, Praveen; Gupta, Sanjay

    2011-01-01

    Conditional Cash Transfer (CCT) schemes have shown largely favorable changes in the health seeking behavior. This evaluation study assesses the process and performance of an Additional Cash Incentive (ACI) scheme within an ongoing CCT scheme in India, and document lessons. A controlled before and during design study was conducted in Madhya Pradesh state of India, from August 2007 to March 2008, with increased in institutional deliveries as a primary outcome. In depth interviews, focus group discussions and household surveys were done for data collection. Lack of awareness about ACI scheme amongst general population and beneficiaries, cumbersome cash disbursement procedure, intricate eligibility criteria, extensive paper work, and insufficient focus on community involvement were the major implementation challenges. There were anecdotal reports of political interference and possible scope for corruption. At the end of implementation period, overall rate of institutional deliveries had increased in both target and control populations; however, the differences were not statistically significant. No cause and effect association could be proven by this study. Poor planning and coordination, and lack of public awareness about the scheme resulted in low utilization. Thus, proper IEC and training, detailed implementation plan, orientation training for implementer, sufficient budgetary allocation, and community participation should be an integral part for successful implementation of any such scheme. The lesson learned this evaluation study may be useful in any developing country setting and may be utilized for planning and implementation of any ACI scheme in future.

  16. Materials Processing in Space (MPS) program description

    NASA Technical Reports Server (NTRS)

    1981-01-01

    Insight is provided into the scientific rotationale for materials processing in space (MPS), and a comprehensive and cohesive approach for implementation and integration of the many, diverse aspects of MPS is described. The programmatic and management functions apply to all projects and activities implemented under MPS. It is intended that specific project plans, providing project unique details, will be appended to this document for endeavors such as the Space Processing Applications Rocket (SPAR) Project, the Materials Experiment Assembly (MEA) Project, the MPS/Spacelab (MPS/SL) Project, and the Materials Experiment Carrier (MEC) Payloads.

  17. Y-12 Groundwater Protection Program Monitoring Optimization Plan for Groundwater Monitoring Wells at the U.S. Department of Energy Y-12 National Security Complex, Oak Ridge, Tennessee

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None, None

    This document is the monitoring optimization plan for groundwater monitoring wells associated with the U.S. Department of Energy (DOE) Y-12 National Security Complex (Y-12) in Oak Ridge, Tennessee. The plan describes the technical approach that is implemented under the Y-12 Groundwater Protection Program (GWPP) to focus available resources on the monitoring wells at Y-12 that provide the most useful hydrologic and groundwater quality monitoring data. The technical approach is based on the GWPP status designation for each well. Under this approach, wells granted “active” status are used by the GWPP for hydrologic monitoring and/or groundwater quality sampling, whereas wells grantedmore » “inactive” status are not used for either purpose. The status designation also defines the frequency at which the GWPP will inspect applicable wells, the scope of these well inspections, and extent of any maintenance actions initiated by the GWPP. Details regarding the ancillary activities associated with implementation of this plan (e.g., well inspection) are deferred to the referenced GWPP plans.« less

  18. Field Implementation Plan for the In-Situ Bioremediation Treatability Study at the Technical Area-V Groundwater Area of Concern

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Li, Jun

    This Field Implementation Plan (FIP) was prepared by Sandia National Laboratories, New Mexico (SNL/NM) and provides instruction on conducting a series of in-situ bioremediation (ISB) tests as described in the Revised Treatability Study Work Plan for In-Situ Bioremediation at the Technical Area-V Groundwater Area of Concern, referred to as the Revised Work Plan in this FIP. The Treatability Study is designed to gravity inject an electron-donor substrate and bioaugmentation bacteria into groundwater via three injection wells to perform bioremediation of the constituents of concern (COCs), nitrate and trichloroethene (TCE), in the regions with the highest concentrations at the Technical Area-Vmore » Groundwater (TAVG) Area of Concern (AOC). The Treatability Study will evaluate the effectiveness of bioremediation solution delivery and COC treatment over time. This FIP is designed for SNL/NM work planning and management. It is not intended to be submitted for regulator’s approval. The technical details presented in this FIP are subject to change based on field conditions, availability of equipment and materials, feasibility, and inputs from Sandia personnel and Aboveground Injection System contractor.« less

  19. A literature review for large-scale health information system project planning, implementation and evaluation.

    PubMed

    Sligo, Judith; Gauld, Robin; Roberts, Vaughan; Villa, Luis

    2017-01-01

    Information technology is perceived as a potential panacea for healthcare organisations to manage pressure to improve services in the face of increased demand. However, the implementation and evaluation of health information systems (HIS) is plagued with problems and implementation shortcomings and failures are rife. HIS implementation is complex and relies on organisational, structural, technological, and human factors to be successful. It also requires reflective, nuanced, multidimensional evaluation to provide ongoing feedback to ensure success. This article provides a comprehensive review of the literature about evaluating and implementing HIS, detailing the challenges and recommendations for both evaluators and healthcare organisations. The factors that inhibit or promote successful HIS implementation are identified and effective evaluation strategies are described with the goal of informing teams evaluating complex HIS. Copyright © 2016 Elsevier Ireland Ltd. All rights reserved.

  20. Implementing peer review of teaching: a guide for dental educators.

    PubMed

    Cunningham, I M; Johnson, I; Lynch, C D

    2017-04-07

    Peer review of teaching (PRT) is well established and valued within higher education. Increasingly, dental educators involved in undergraduate or postgraduate teaching are required to undertake PRT as part of their teaching development. Despite this, there is a paucity of literature relating to PRT within dental education, and none that considers the implementation of PRT within large dental teaching establishments. This article describes in detail a staged process for the planning and implementation of PRT within a UK dental school. It uses relevant educational literature to supplement the authors' experiences and recommendations. By highlighting aspects of the process which are key to successful implementation, it is a useful guide for all dental educator teams who wish to successfully introduce, restructure or refresh a PRT scheme.

  1. Space station needs, attributes and architectural options. Volume 1: Executive summary NASA

    NASA Technical Reports Server (NTRS)

    1983-01-01

    The uses alignment plan was implemented. The existing data bank was used to define a large number of station requirements. Ten to 20 valid mission scenarios were developed. Architectural options as they are influenced by communications operations, subsystem evolvability, and required technology growth are defined. Costing of evolutionary concepts, alternative approaches, and options, was based on minimum design details.

  2. Educational Leaders as Stewards: Selecting a National Curriculum Guided by the "Ways of Knowing through the Realms of Meaning"

    ERIC Educational Resources Information Center

    Skinner, Desiree A.; Kritsonis, William Allan

    2006-01-01

    All educators should want to provide students with the best possible education, and this is done through curriculum selection. "Ways of Knowing Through the Realms of Meaning" by Dr. William A. Kritsonis (2007) presents a detailed plan for schools to develop and implement modern curriculum that is perennial. Following Dr. Kritsonis's fundamental…

  3. 75 FR 54378 - Draft Environmental Impact Statement; Stehekin River Corridor Implementation Plan; Lake Chelan...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-07

    .... While the COE failed to secure funds to do a detailed five-year study, its emergency management team recommended extensive bank hardening with rock, and dredging of the river channel. Estimated one-time cost is... floods. Until now, the NPS has addressed problems on a case-by-case basis throughout the valley with the...

  4. Dynamic mobility applications open source application development portal task 6.1a : architecture and high-level design task 6.1b : list of requirements included in initial architecture and high-level design.

    DOT National Transportation Integrated Search

    2016-10-12

    This document offers a detailed discussion of the systems functionality that was planned to be implemented. However, following the Agile Development methodology, during the course of system development, diligent decisions were made based on the la...

  5. Monterrey, La Ciudad Dorada/Monterrey, The Golden City. Curriculum Projects. Fulbright-Hays Summer Seminars Abroad Program, 2002 (Mexico).

    ERIC Educational Resources Information Center

    Quintyne, Susan

    This curriculum project is designed for high school classes in Spanish, social studies, or global studies. The project's lesson plan lists materials needed; poses seven key questions about Mexico and Monterrey; outlines background notes on Mexico; and provides a detailed, step-by-step procedure for classroom implementation during three days. Also…

  6. Final Hanford Comprehensive Land-Use Plan Environmental Impact Statement, Hanford Site, Richland, Washington

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    N /A

    This Final ''Hanford Comprehensive Land-Use Plan Environmental Impact Statement'' (HCP EIS) is being used by the Department of Energy (DOE) and its nine cooperating and consulting agencies to develop a comprehensive land-use plan (CLUP) for the Hanford Site. The DOE will use the Final HCP EIS as a basis for a Record of Decision (ROD) on a CLUP for the Hanford Site. While development of the CLUP will be complete with release of the HCP EIS ROD, full implementation of the CLUP is expected to take at least 50 years. Implementation of the CLUP would begin a more detailed planningmore » process for land-use and facility-use decisions at the Hanford Site. The DOE would use the CLUP to screen proposals. Eventually, management of Hanford Site areas would move toward the CLUP land-use goals. This CLUP process could take more than 50 years to fully achieve the land-use goals.« less

  7. Final Work Plan: Targeted Investigation at York, Nebraska

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    LaFreniere, Lorraine M.

    The targeted investigation at York will be implemented in phases, so that data collected and interpretations developed at each stage of the program can be evaluated to guide subsequent phases most effectively. Section 2 of this Work Plan presents a brief overview of the York site, its geologic and hydrologic setting, and the previous CCC/USDA investigations. Section 3, outlines the proposed technical program for the targeted investigation, and Section 4 describes the investigative methods to be employed. A community relations plan is in Section 5, and Section 6 includes health and safety information. In addition to this site-specific Work Plan,more » the Master Work Plan (Argonne 2002) developed by Argonne for CCC/USDA investigations in Nebraska should be consulted for complete details of the methods and procedures to be used at York.« less

  8. Transportation Institutional Plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    This Institutional Plan is divided into three chapters. Chapter 1 provides background information, discusses the purposes of the Plan and the policy guidance for establishing the transportation system, and describes the projected system and the plans for its integrated development. Chapter 2 discusses the major participants who must interact to build the system. Chapter 3 suggests mechanisms for interaction that will foster wide participation in program planning and implementation and provides a framework for managing and resolving the issues related to development and operation of the transportation system. A list of acronyms and a glossary are included for the reader'smore » convenience. Also included in this Plan are four appendices. Of particular importance is Appendix A, which includes detailed discussion of specific transportation issues. Appendices B, C, and D provide supporting material to assist the reader in understanding the roles of the involved institutions.« less

  9. CNES Strategic Plan for Space Traffic Control

    NASA Astrophysics Data System (ADS)

    Alby, Fernand

    2013-09-01

    The increasing orbital debris population represents a growing risk to operational satellites on-orbit and also to populations and properties on-ground. Today available space surveillance data allow a better implementation of protection activities which are now part of operational services. The overall frame of these activities at CNES is given by a strategic plan defining the long term views and the corresponding activities to be carried out during the next years. This plan, established in close cooperation with French Defence organizations, includes, among others, two operational space traffic control activities: prevention of on-orbit collisions and atmospheric re-entries predictions.This paper presents first the national organization relative to these activities together with the internal CNES process starting from a high level roadmap, up to a detailed action plan. This plan contains operational activities and supporting studies and models development.The content of this plan is given with a focus on operational activities dealing with space traffic control.

  10. Implementing a clinical ethics needs assessment survey: results of a pilot study (part 2 of 2).

    PubMed

    Frolic, Andrea; Andreychuk, Sandra; Seidlitz, Wendy; Djuric-Paulin, Angela; Flaherty, Barb; Jennings, Barb; Peace, Donna

    2013-03-01

    This paper details the implementation of the Clinical Ethics Needs Assessment Survey (CENAS) through a pilot study in five units within Hamilton Health Sciences. We describe how these pilot sites were selected, how we implemented the survey, the significant results and our interpretation of the findings. The primary goal of this paper is to share our experiences using this tool, specifically the challenges we encountered conducting a staff ethics needs assessment across different units in a large teaching hospital, and the facilitators to our success. We conclude with a discussion of the limitations of this study, our plans for using the results to develop a proactive ethics education strategy, and suggestions for other organizations wishing to adapt the CENAS to assess their staff ethics needs. Our secondary goal is to advance the "quality agenda" for ethics programs by demonstrating how a tool like the CENAS can be used to design more effective educational interventions, and to support strategic planning and proactive priority-setting for ethics programs.

  11. A detailed description of the implementation of inpatient insulin orders with a commercial electronic health record system.

    PubMed

    Neinstein, Aaron; MacMaster, Heidemarie Windham; Sullivan, Mary M; Rushakoff, Robert

    2014-07-01

    In the setting of Meaningful Use laws and professional society guidelines, hospitals are rapidly implementing electronic glycemic management order sets. There are a number of best practices established in the literature for glycemic management protocols and programs. We believe that this is the first published account of the detailed steps to be taken to design, implement, and optimize glycemic management protocols in a commercial computerized provider order entry (CPOE) system. Prior to CPOE implementation, our hospital already had a mature glycemic management program. To transition to CPOE, we underwent the following 4 steps: (1) preparation and requirements gathering, (2) design and build, (3) implementation and dissemination, and (4) optimization. These steps required more than 2 years of coordinated work between physicians, nurses, pharmacists, and programmers. With the move to CPOE, our complex glycemic management order sets were successfully implemented without any significant interruptions in care. With feedback from users, we have continued to refine the order sets, and this remains an ongoing process. Successful implementation of glycemic management protocols in CPOE is dependent on broad stakeholder input and buy-in. When using a commercial CPOE system, there may be limitations of the system, necessitating workarounds. There should be an upfront plan to apply resources for continuous process improvement and optimization after implementation. © 2014 Diabetes Technology Society.

  12. Multi-GPU implementation of a VMAT treatment plan optimization algorithm

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Tian, Zhen, E-mail: Zhen.Tian@UTSouthwestern.edu, E-mail: Xun.Jia@UTSouthwestern.edu, E-mail: Steve.Jiang@UTSouthwestern.edu; Folkerts, Michael; Tan, Jun

    Purpose: Volumetric modulated arc therapy (VMAT) optimization is a computationally challenging problem due to its large data size, high degrees of freedom, and many hardware constraints. High-performance graphics processing units (GPUs) have been used to speed up the computations. However, GPU’s relatively small memory size cannot handle cases with a large dose-deposition coefficient (DDC) matrix in cases of, e.g., those with a large target size, multiple targets, multiple arcs, and/or small beamlet size. The main purpose of this paper is to report an implementation of a column-generation-based VMAT algorithm, previously developed in the authors’ group, on a multi-GPU platform tomore » solve the memory limitation problem. While the column-generation-based VMAT algorithm has been previously developed, the GPU implementation details have not been reported. Hence, another purpose is to present detailed techniques employed for GPU implementation. The authors also would like to utilize this particular problem as an example problem to study the feasibility of using a multi-GPU platform to solve large-scale problems in medical physics. Methods: The column-generation approach generates VMAT apertures sequentially by solving a pricing problem (PP) and a master problem (MP) iteratively. In the authors’ method, the sparse DDC matrix is first stored on a CPU in coordinate list format (COO). On the GPU side, this matrix is split into four submatrices according to beam angles, which are stored on four GPUs in compressed sparse row format. Computation of beamlet price, the first step in PP, is accomplished using multi-GPUs. A fast inter-GPU data transfer scheme is accomplished using peer-to-peer access. The remaining steps of PP and MP problems are implemented on CPU or a single GPU due to their modest problem scale and computational loads. Barzilai and Borwein algorithm with a subspace step scheme is adopted here to solve the MP problem. A head and neck (H and N) cancer case is then used to validate the authors’ method. The authors also compare their multi-GPU implementation with three different single GPU implementation strategies, i.e., truncating DDC matrix (S1), repeatedly transferring DDC matrix between CPU and GPU (S2), and porting computations involving DDC matrix to CPU (S3), in terms of both plan quality and computational efficiency. Two more H and N patient cases and three prostate cases are used to demonstrate the advantages of the authors’ method. Results: The authors’ multi-GPU implementation can finish the optimization process within ∼1 min for the H and N patient case. S1 leads to an inferior plan quality although its total time was 10 s shorter than the multi-GPU implementation due to the reduced matrix size. S2 and S3 yield the same plan quality as the multi-GPU implementation but take ∼4 and ∼6 min, respectively. High computational efficiency was consistently achieved for the other five patient cases tested, with VMAT plans of clinically acceptable quality obtained within 23–46 s. Conversely, to obtain clinically comparable or acceptable plans for all six of these VMAT cases that the authors have tested in this paper, the optimization time needed in a commercial TPS system on CPU was found to be in an order of several minutes. Conclusions: The results demonstrate that the multi-GPU implementation of the authors’ column-generation-based VMAT optimization can handle the large-scale VMAT optimization problem efficiently without sacrificing plan quality. The authors’ study may serve as an example to shed some light on other large-scale medical physics problems that require multi-GPU techniques.« less

  13. Ensuring quality: a key consideration in scaling-up HIV-related point-of-care testing programs

    PubMed Central

    Fonjungo, Peter N.; Osmanov, Saladin; Kuritsky, Joel; Ndihokubwayo, Jean Bosco; Bachanas, Pam; Peeling, Rosanna W.; Timperi, Ralph; Fine, Glenn; Stevens, Wendy; Habiyambere, Vincent; Nkengasong, John N.

    2016-01-01

    Objective: The objective of the WHO/US President's Emergency Plan for AIDS Relief consultation was to discuss innovative strategies, offer guidance, and develop a comprehensive policy framework for implementing quality-assured HIV-related point-of-care testing (POCT). Methods: The consultation was attended by representatives from international agencies (WHO, UNICEF, UNITAID, Clinton Health Access Initiative), United States Agency for International Development, Centers for Disease Control and Prevention/President's Emergency Plan for AIDS Relief Cooperative Agreement Partners, and experts from more than 25 countries, including policy makers, clinicians, laboratory experts, and program implementers. Main outcomes: There was strong consensus among all participants that ensuring access to quality of POCT represents one of the key challenges for the success of HIV prevention, treatment, and care programs. The following four strategies were recommended: implement a newly proposed concept of a sustainable quality assurance cycle that includes careful planning; definition of goals and targets; timely implementation; continuous monitoring; improvements and adjustments, where necessary; and a detailed evaluation; the importance of supporting a cadre of workers [e.g. volunteer quality corps (Q-Corps)] with the role to ensure that the quality assurance cycle is followed and sustained; implementation of the new strategy should be seen as a step-wise process, supported by development of appropriate policies and tools; and joint partnership under the leadership of the ministries of health to ensure sustainability of implementing novel approaches. Conclusion: The outcomes of this consultation have been well received by program implementers in the field. The recommendations also laid the groundwork for developing key policy and quality documents for the implementation of HIV-related POCT. PMID:26807969

  14. Integrating Energy and Environmental Management in Wood Furniture Industry

    PubMed Central

    Babić, Milun; Jelić, Dubravka; Konćalović, Davor; Vukašinović, Vladimir

    2014-01-01

    As energy costs continue to rise, industrial plants (even those of energy nonintensive industries such as furniture industry) need effective way to reduce the amount of energy they consume. Besides, there are a number of economic and environmental reasons why a company should consider environmental management initiatives. This paper provides a detailed guideline for implementing joint energy and environmental management system in wood furniture industrial company. It covers in detail all essential aspects of the system: initial system assessment, organization, policy development, energy and environmental auditing, action plan development, system promotion, checking system performance, and management review. PMID:24587734

  15. Integrating energy and environmental management in wood furniture industry.

    PubMed

    Gordić, Dušan; Babić, Milun; Jelić, Dubravka; Konćalović, Davor; Vukašinović, Vladimir

    2014-01-01

    As energy costs continue to rise, industrial plants (even those of energy nonintensive industries such as furniture industry) need effective way to reduce the amount of energy they consume. Besides, there are a number of economic and environmental reasons why a company should consider environmental management initiatives. This paper provides a detailed guideline for implementing joint energy and environmental management system in wood furniture industrial company. It covers in detail all essential aspects of the system: initial system assessment, organization, policy development, energy and environmental auditing, action plan development, system promotion, checking system performance, and management review.

  16. Computerized fracture critical and specialized bridge inspection program with NDE applications

    NASA Astrophysics Data System (ADS)

    Fish, Philip E.

    1998-03-01

    Wisconsin Department of Transportation implemented a Fracture Critical & Specialized Inspection Program in 1987. The program has a strong emphasis on Nondestructive Testing (NDT). The program is also completely computerized, using laptop computers to gather field data, digital cameras for pictures, and testing equipment with download features. Final inspection reports with detailed information can be delivered within days of the inspection. The program requires an experienced inspection team and qualified personnel. Individuals performing testing must be licensed ASNT (American Society for Nondestructive Testing) Level III and must be licensed Certified Weld Inspectors (American Welding Society). Several critical steps have been developed to assure that each inspection identifies all possible deficiencies that may be possible on a Fracture Critical or Unique Bridge. They include; review of all existing plans and maintenance history; identification of fracture critical members, identification of critical connection details, welds, & fatigue prone details, development of visual and NDE inspection plan; field inspection procedures; and a detailed formal report. The program has found several bridges with critical fatigue conditions which have resulted in replacement or major rehabilitation. In addition, remote monitoring systems have been installed on structures with serious cracking to monitor for changing conditions.

  17. India's National Action Plan on Climate Change.

    PubMed

    Pandve, Harshal T

    2009-04-01

    Climate change is one of the most critical global challenges of our times. Recent events have emphatically demonstrated our growing vulnerability to climate change. Climate change impacts will range from affecting agriculture - further endangering food security - to sea-level rise and the accelerated erosion of coastal zones, increasing intensity of natural disasters, species extinction, and the spread of vector-borne diseases. India released its much-awaited National Action Plan on Climate Change (NAPCC) to mitigate and adapt to climate change on June 30, 2008, almost a year after it was announced. The NAPCC runs through 2017 and directs ministries to submit detailed implementation plans to the Prime Minister's Council on Climate Change by December 2008. This article briefly reviews the plan and opinion about it from different experts and organizations.

  18. A sampling design framework for monitoring secretive marshbirds

    USGS Publications Warehouse

    Johnson, D.H.; Gibbs, J.P.; Herzog, M.; Lor, S.; Niemuth, N.D.; Ribic, C.A.; Seamans, M.; Shaffer, T.L.; Shriver, W.G.; Stehman, S.V.; Thompson, W.L.

    2009-01-01

    A framework for a sampling plan for monitoring marshbird populations in the contiguous 48 states is proposed here. The sampling universe is the breeding habitat (i.e. wetlands) potentially used by marshbirds. Selection protocols would be implemented within each of large geographical strata, such as Bird Conservation Regions. Site selection will be done using a two-stage cluster sample. Primary sampling units (PSUs) would be land areas, such as legal townships, and would be selected by a procedure such as systematic sampling. Secondary sampling units (SSUs) will be wetlands or portions of wetlands in the PSUs. SSUs will be selected by a randomized spatially balanced procedure. For analysis, the use of a variety of methods as a means of increasing confidence in conclusions that may be reached is encouraged. Additional effort will be required to work out details and implement the plan.

  19. Secure environment for real-time tele-collaboration on virtual simulation of radiation treatment planning.

    PubMed

    Ntasis, Efthymios; Maniatis, Theofanis A; Nikita, Konstantina S

    2003-01-01

    A secure framework is described for real-time tele-collaboration on Virtual Simulation procedure of Radiation Treatment Planning. An integrated approach is followed clustering the security issues faced by the system into organizational issues, security issues over the LAN and security issues over the LAN-to-LAN connection. The design and the implementation of the security services are performed according to the identified security requirements, along with the need for real time communication between the collaborating health care professionals. A detailed description of the implementation is given, presenting a solution, which can directly be tailored to other tele-collaboration services in the field of health care. The pilot study of the proposed security components proves the feasibility of the secure environment, and the consistency with the high performance demands of the application.

  20. Vocational rehabilitation: facilitating evidence based practice through participatory action research.

    PubMed

    Maciver, Donald; Prior, Susan; Forsyth, Kirsty; Walsh, Mike; Meiklejohn, Allison; Irvine, Linda; Pentland, Duncan

    2013-04-01

    Improving vocational rehabilitation in line with the current evidence base is an area of considerable interest. Aims To describe the strategies used by a multidisciplinary team in the initial stages of a participatory action research (PAR) approach to improving a vocational rehabilitation service. A literature review and PAR process were completed. One hundred and fifteen participants engaged in multifaceted data collection and analysis, building consensus around key principles for a new vocational rehabilitation service. A synthesis of our literature review and PAR process was developed into a set of principles for practice which we plan to implement across the service. We have developed methodologies in interdisciplinary collaborations spanning statutory and non-statutory services. We have developed a set of principles for practice and detailed plans for implementation are being drawn up to inform provision in the future.

  1. The effectiveness of national strategic guidelines at a local level: a case study of the UK general aviation industry

    NASA Astrophysics Data System (ADS)

    Lober, Terence

    The thesis is concerned with the prospects for reducing strategic-local tensions in the British planning process. It examines the conflicts surrounding small general aviation aerodromes as a means of understanding these tensions, why they have evolved, and if they might be reconciled through planning reform. The only prior academic research to have touched upon this issue through general aviation has been an ESRC funded project undertaken by Gallent and colleagues (1999), who found aerodromes provided a microcosm of planning's issues. Building on this work, the thesis develops what is meant by strategic-local tensions, which in broad terms are described as differences between national and regional guidance/plans and what actually takes place locally. Moving from a basic research question it develops a wide planning perspective based on the literature by discussing the meaning of planning, its history and issues for example, how conflicts in planning might be influenced by the broader socio-political environment. The thesis then arrives at three hypotheses which question the effectiveness of the existing strategic guideline implementation process, develops a local planning authority framework and addresses issues of reflectivity and bias. Results from three national surveys of pilots, aerodromes and manufacturers, plus longitudinal analysis of government and other datasets, are then used to detail a comprehensive and unique description of general aviation, which includes a costing based account of the direct expenditure of flying activity. This provides a substantive foundation for a local planning authority survey which both extends previous boundaries and enables the process of implementing strategic objectives to be disaggregated and evaluated. Field visits to twenty six aerodromes and five local authorities are subsequently used to explore gaps within the strategic implementation process and to develop conclusions, within the wider landscape of planning, about the nature of strategic local tensions and implications for planning reform.

  2. Plan for the design, development, and implementation, and operation of the National Water Information System

    USGS Publications Warehouse

    Edwards, M.D.

    1987-01-01

    The Water Resources Division of the U.S. Geological Survey is developing a National Water Information System (NWIS) that will integrate and replace its existing water data and information systems of the National Water Data Storage and Retrieval System, National Water Data Exchange, National Water-Use Information, and Water Resources Scientific Information Center programs. It will be a distributed data system operated as part of the Division 's Distributed Information System, which is a network of computers linked together through a national telecommunication network known as GEONET. The NWIS is being developed as a series of prototypes that will be integrated as they are completed to allow the development and implementation of the system in a phased manner. It also is being developed in a distributed manner using personnel who work under the coordination of a central NWIS Project Office. Work on the development of the NWIS began in 1983 and it is scheduled for completion in 1990. This document presents an overall plan for the design, development, implementation, and operation of the system. Detailed discussions are presented on each of these phases of the NWIS life cycle. The planning, quality assurance, and configuration management phases of the life cycle also are discussed. The plan is intended to be a working document for use by NWIS management and participants in its design and development and to assist offices of the Division in planning and preparing for installation and operation of the system. (Author 's abstract)

  3. The ADEPT Framework for Intelligent Autonomy

    NASA Technical Reports Server (NTRS)

    Ricard, Michael; Kolitz, Stephan

    2003-01-01

    This paper describes the design and implementation of Draper Laboratory's All-Domain Execution and Planning Technology (ADEPT) architecture for intelligent autonomy. Intelligent autonomy is the ability to plan and execute complex activities in a manner that provides rapid, effective response to stochastic and dynamic mission events. Thus, intelligent autonomy enables the high-level reasoning and adaptive behavior for an unmanned vehicle that is provided by an operator in man-in-the-loop systems. Draper s intelligent autonomy has architecture evolved over a decade and a half beginning in the mid 1980's culminating in an operational experiment funded under DARPA's Autonomous Minehunting and Mapping Technologies (AMMT) unmanned undersea vehicle program. ADEPT continues to be refined through its application to current programs that involve air vehicles, satellites and higher-level planning used to direct multiple vehicles. The objective of ADEPT is to solidify a proven, dependable software approach that can be quickly applied to new vehicles and domains. The architecture can be viewed as a hierarchical extension of the sense-think-act paradigm of intelligence and has strong parallels with the military's Observe-Orient-Decide-Act (OODA) loop. The key elements of the architecture are planning and decision-making nodes comprising modules for situation assessment, plan generation, plan implementation and coordination. A reusable, object-oriented software framework has been developed that implements these functions. As the architecture is applied to new areas, only the application specific software needs to be developed. This paper describes the core architecture in detail and discusses how this has been applied in the undersea, air, ground and space domains.

  4. The effects of high energy particles on planetary missions

    NASA Technical Reports Server (NTRS)

    Robinson, Paul A., Jr.

    1988-01-01

    Researchers review the background and motivation for the detailed study of the variability and uncertainty of the particle environment from a space systems planning perspective. The engineering concern raised by each environment is emphasized rather than the underlying physics of the magnetosphere or the sun. Missions now being planned span the short term range of one to three years to periods over ten years. Thus the engineering interest is beginning to stretch over periods of several solar cycles. Coincidentally, detailed measurements of the environment are now becoming available over that period of time. Both short term and long term environmental predictions are needed for proper mission planning. Short term predictions, perhaps based on solar indices, real time observations, or short term systematics, are very useful in near term planning -- launches, EVAs (extravehicular activities), coordinated observations, and experiments which require the magnetosphere to be in a certain state. Long term predictions of both average and extreme conditions are essential to mission design. Engineering considerations are many times driven by the worst case environment. Knowledge of the average conditions and their variability allows trade-off studies to be made, implementation of designs which degrade gracefully under multi-stress environments.

  5. Summary appraisals of the Nation's ground-water resources; Great Basin region

    USGS Publications Warehouse

    Eakin, Thomas E.; Price, Don; Harrill, J.R.

    1976-01-01

    Only a few areas of the Great Basin Region have been studied in detail sufficient to enable adequate design of an areawide groundwater development. These areas already have been developed. As of 1973 data for broadly outlining the ground-water resources of the region had been obtained. However, if large-scale planned development is to become a reality, a program for obtaining adequate hydrologic and related data would be a prerequisite. Ideally, the data should be obtained in time to be available for the successively more intensive levels of planning required to implement developments.

  6. Issues and Experiences in Logistics Collaboration

    NASA Astrophysics Data System (ADS)

    Lehoux, Nadia; Audy, Jean-François; D‘Amours, Sophie; Rönnqvist, Mikael

    Collaborative logistics is becoming more important in today’s industry. This is driven by increased environmental concerns, improved efficiency through collaborative planning supporting resources sharing and new business models implementation. This paper explores collaborative logistics and reports on business applications within the forest products industry in Sweden and Canada. It first describes current opportunities in collaborative planning. It then discusses issues related to building the coalition as well as sharing resources and benefits. Three business cases are described and used to support the discussion around these main issues. Finally, different challenges are detailed, opening new paths for researchers in the field.

  7. Plant-Based Diets: A Physician’s Guide

    PubMed Central

    Hever, Julieanna

    2016-01-01

    Because of the ever-increasing body of evidence in support of the health advantages of plant-based nutrition, there is a need for guidance on implementing its practice. This article provides physicians and other health care practitioners an overview of the myriad benefits of a plant-based diet as well as details on how best to achieve a well-balanced, nutrient-dense meal plan. It also defines notable nutrient sources, describes how to get started, and offers suggestions on how health care practitioners can encourage their patients to achieve goals, adhere to the plan, and experience success. PMID:27400178

  8. Network speech systems technology program

    NASA Astrophysics Data System (ADS)

    Weinstein, C. J.

    1981-09-01

    This report documents work performed during FY 1981 on the DCA-sponsored Network Speech Systems Technology Program. The two areas of work reported are: (1) communication system studies in support of the evolving Defense Switched Network (DSN) and (2) design and implementation of satellite/terrestrial interfaces for the Experimental Integrated Switched Network (EISN). The system studies focus on the development and evaluation of economical and endurable network routing procedures. Satellite/terrestrial interface development includes circuit-switched and packet-switched connections to the experimental wideband satellite network. Efforts in planning and coordination of EISN experiments are reported in detail in a separate EISN Experiment Plan.

  9. Evidence-based and value-based formulary guidelines.

    PubMed

    Neumann, Peter J

    2004-01-01

    Health plans and hospitals have long used drug formularies, but the processes by which formulary committees made decisions have typically lacked transparency and scientific rigor. A growing number of organizations have begun implementing formulary guidelines issued by the Academy of Managed Care Pharmacy (AMCP). These guidelines call for health plans to request formally that drug companies present a standardized "dossier" that contains detailed information not only on the drug's effectiveness and safety but also on its economic value relative to alternative therapies. This paper describes the guidelines, reviews progress to date, and analyzes several critical issues for the future.

  10. Performance measures in the earth observations commercialization applications program

    NASA Astrophysics Data System (ADS)

    Macauley, Molly K.

    1996-03-01

    Performance measures in the Earth Observations Commercialization Application Program (EOCAP) are key to its success and include net profitability; enhancements to industry productivity through generic innovations in industry practices, standards, and protocols; and documented contributions to public policy governing the newly developing remote sensing industry. Because EOCAP requires company co-funding, both parties to the agreement (the government and the corporate partner) have incentives to pursue these goals. Further strengthening progress towards these goals are requirements for business plans in the company's EOCAP proposal, detailed scrutiny given these plans during proposal selection, and regularly documented progress reports during project implementation.

  11. Strategic Plan for the Spanish Academy of Dermatology and Venerology (AEDV): FuturAEDV 2013-2017.

    PubMed

    Ribera Pibernat, M; Moreno Jiménez, J C; Valcuende Cavero, F; Soto de Delás, J; Vázquez Veiga, H; Lázaro Ochaíta, P; Giménez Arnau, A

    2014-09-01

    The Spanish Academy of Dermatology and Venereology (AEDV) has decided that a Strategic Plan is needed to help the association adapt to new circumstances and anticipate future developments. 1) To position the AEDV as a medical association that can exert an influence in everything related to dermatology. 2) To contribute to the development of the specialty, strengthening the prestige and reputation of dermatology and dermatologists. 3) To establish a model for operating and strategic thinking that can be handed on to successive Boards of Directors and will enable the Academy to identify future challenges. The approach used to develop the Strategic Plan was as follows: analysis of trends in the health care system; assessment of the current situation of AEDV and of dermatology in general through an internal analysis based on surveys and interviews with academics; analysis of strengths, weaknesses, opportunities, and threats; preparation of a mission statement; and identification, development, and implementation of a strategy map prioritizing strategic lines of action. The strategy map set out 16 general goals grouped into 4 main topics (achieving the vision, internal and external customers, internal processes, and innovation) and detailed in an action plan with 19 initiatives, each with specific actions. The plan will be monitored by the Strategic Plan Monitoring Committee, which is made up of the members of the Standing Committee and the chairs of the 9 Technical Committees responsible for implementing the initiatives. The Functional Plan should guide the management of AEDV until 2017, and its implementation will enable the association to contribute to the development and prestige of the specialty and position itself as a reference in terms of its functional model. Copyright © 2014 Elsevier España, S.L.U. y AEDV. All rights reserved.

  12. Planning riparian restoration in the context of tamarix control in Western North America

    USGS Publications Warehouse

    Shafroth, P.B.; Beauchamp, Vanessa B.; Briggs, M.K.; Lair, K.; Scott, M.L.; Sher, A.A.

    2008-01-01

    Throughout the world, the condition of many riparian ecosystems has declined due to numerous factors, including encroachment of non-native species. In the western United States, millions of dollars are spent annually to control invasions of Tamarix spp., introduced small trees or shrubs from Eurasia that have colonized bottomland ecosystems along many rivers. Resource managers seek to control Tamarix in attempts to meet various objectives, such as increasing water yield and improving wildlife habitat. Often, riparian restoration is an implicit goal, but there has been little emphasis on a process or principles to effectively plan restoration activities, and many Tamarix removal projects are unsuccessful at restoring native vegetation. We propose and summarize the key steps in a planning process aimed at developing effective restoration projects in Tamarix-dominated areas. We discuss in greater detail the biotic and abiotic factors central to the evaluation of potential restoration sites and summarize information about plant communities likely to replace Tamarix under various conditions. Although many projects begin with implementation, which includes the actual removal of Tamarix, we stress the importance of pre-project planning that includes: (1) clearly identifying project goals; (2) developing realistic project objectives based on a detailed evaluation of site conditions; (3) prioritizing and selecting Tamarix control sites with the best chance of ecological recovery; and (4) developing a detailed tactical plan before Tamarix is removed. After removal, monitoring and maintenance as part of an adaptive management approach are crucial for evaluating project success and determining the most effective methods for restoring these challenging sites. ?? 2008 Society for Ecological Restoration International.

  13. School Operations and Maintenance: Best Practices For Controlling Energy Costs. A Guidebook for K-12 School System Business Officers and Facilities Managers

    ERIC Educational Resources Information Center

    US Department of Energy, 2004

    2004-01-01

    Operations and maintenance (O&M) offers not only strategies for maintaining facilities, but also opportunities for reducing energy costs and increasing energy efficiency at existing schools, regardless of age. This Guidebook provides detailed and practical guidance on how K-12 school districts can plan and implement enhancements to their current…

  14. Automated personnel data base system specifications, Task V. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bartley, H.J.; Bocast, A.K.; Deppner, F.O.

    1978-11-01

    The full title of this study is 'Development of Qualification Requirements, Training Programs, Career Plans, and Methodologies for Effective Management and Training of Inspection and Enforcement Personnel.' Task V required the development of an automated personnel data base system for NRC/IE. This system is identified as the NRC/IE Personnel, Assignment, Qualifications, and Training System (PAQTS). This Task V report provides the documentation for PAQTS including the Functional Requirements Document (FRD), the Data Requirements Document (DRD), the Hardware and Software Capabilities Assessment, and the Detailed Implementation Schedule. Specific recommendations to facilitate implementation of PAQTS are also included.

  15. Mission and Safety Critical (MASC) plans for the MASC Kernel simulation

    NASA Technical Reports Server (NTRS)

    1991-01-01

    This report discusses a prototype for Mission and Safety Critical (MASC) kernel simulation which explains the intended approach and how the simulation will be used. Smalltalk is chosen for the simulation because of usefulness in quickly building working models of the systems and its object-oriented approach to software. A scenario is also introduced to give details about how the simulation works. The eventual system will be a fully object-oriented one implemented in Ada via Dragoon. To implement the simulation, a scenario using elements typical of those in the Space Station, was created.

  16. The traverse planning process for D-RATS 2010

    NASA Astrophysics Data System (ADS)

    Hörz, Friedrich; Lofgren, Gary E.; Gruener, John E.; Eppler, Dean B.; Skinner, James A.; Fortezzo, Corey M.; Graf, Jodi S.; Bluethmann, William J.; Seibert, Marc A.; Bell, Ernest R.

    2013-10-01

    This report describes the traverse planning process for the Desert Research and Technology Studies (D-RATS) 2010 field simulation of a conceptual 14-day planetary mission. This activity took place between August 23 and September 17, 2010 in the San Francisco Volcanic Field, Arizona. It focused on the utilization of two pressurized rovers and a ground-based communication system, as well as on the development of mission operation concepts for long duration, dual-rover missions. The early planning process began some 12 months prior to the actual field tests and defined the first order engineering-, flight operations, and science objectives. The detailed implementation and refinement of these objectives took place over the ensuing 10 months, resulting in a large number of technical and operational constraints that affected the actual traverse route or the cumulative Extravehicular Activity (EVA) time available for detailed field observations. The science planning proceeded from the generation of photogeologic maps of the test area, to the establishment of prioritized science objectives and associated candidate sites for detailed field exploration. The combination of operational constraints and science objectives resulted in the final design of traverse routes and time lines for each of the 24 traverses needed to support 12 field days by two rovers. Examples of daily traverses will be given that will hopefully illustrate that the design of long duration, long distance planetary traverses is a highly interdisciplinary and time-consuming collaboration between diverse engineers, flight operations personnel, human factors interests, and planetary scientists.

  17. Shuttle free-flying teleoperator system experiment definition. Volume 3: program development requirements

    NASA Technical Reports Server (NTRS)

    1972-01-01

    The planning data are presented for subsequent phases of free-flying teleoperator program (FFTO) and includes costs, schedules and supporting research and technology activities required to implement the free-flying teleoperator system and associated flight equipment. The purpose of the data presented is to provide NASA with the information needed to continue development of the FFTO and integrate it into the space shuttle program. The planning data describes three major program phases consisting of activities and events scheduled to effect integrated design, development, fabrication and operation of an FFTO system. Phase A, Concept Generation, represents a study effort directed toward generating and evaluating a number of feasible FFTO experiment system concepts. Phase B, Definition, will include preliminary design and supporting analysis of the FFTO, the shuttle based equipment and ground support equipment. Phase C/D, Design, Development and Operations will include detail design of the operational FFTO, its integration into the space shuttle, hardware fabrication and testing, delivery of flight hardware and support of flight operations. Emphasis is placed on the planning for Phases A and B since these studies will be implemented early in the development cycle. Phase C/D planning is more general and subject to refinement during the definition phase.

  18. Using the Integrated Vehicle Health Management Research Test and Integration Plan Wiki to Identify Synergistic Test Opportunities

    NASA Technical Reports Server (NTRS)

    Koelfgen, Syri J.; Faber, James J.

    2010-01-01

    The National Aeronautics and Space Administration (NASA) and the aviation industry have recognized a need for developing a method to identify and combine resources to carry out research and testing more efficiently. The Integrated Vehicle Health Management (IVHM) Research Test and Integration Plan (RTIP) Wiki is a tool that is used to visualize, plan, and accomplish collaborative research and testing. Synergistic test opportunities are developed using the RTIP Wiki, and include potential common resource testing that combines assets and personnel from NASA, industry, academia, and other government agencies. A research scenario is linked to the appropriate IVHM milestones and resources detailed in the wiki, reviewed by the research team members, and integrated into a collaborative test strategy. The scenario is then implemented by creating a test plan when appropriate and the research is performed. The benefits of performing collaborative research and testing are achieving higher Technology Readiness Level (TRL) test opportunities with little or no additional cost, improved quality of research, and increased communication among researchers. In addition to a description of the method of creating these joint research scenarios, examples of the successful development and implementation of cooperative research using the IVHM RTIP Wiki are given.

  19. A national action plan for workforce development in behavioral health.

    PubMed

    Hoge, Michael A; Morris, John A; Stuart, Gail W; Huey, Leighton Y; Bergeson, Sue; Flaherty, Michael T; Morgan, Oscar; Peterson, Janice; Daniels, Allen S; Paris, Manuel; Madenwald, Kappy

    2009-07-01

    Across all sectors of the behavioral health field there has been growing concern about a workforce crisis. Difficulties encompass the recruitment and retention of staff and the delivery of accessible and effective training in both initial, preservice training and continuing education settings. Concern about the crisis led to a multiphased, cross-sector collaboration known as the Annapolis Coalition on the Behavioral Health Workforce. With support from the Substance Abuse and Mental Health Services Administration, this public-private partnership crafted An Action Plan for Behavioral Health Workforce Development. Created with input from a dozen expert panels, the action plan outlines seven core strategic goals that are relevant to all sectors of the behavioral health field: expand the role of consumers and their families in the workforce, expand the role of communities in promoting behavioral health and wellness, use systematic recruitment and retention strategies, improve training and education, foster leadership development, enhance infrastructure to support workforce development, and implement a national research and evaluation agenda. Detailed implementation tables identify the action steps for diverse groups and organizations to take in order to achieve these goals. The action plan serves as a call to action and is being used to guide workforce initiatives across the nation.

  20. Sector activities and lessons learned around initial implementation of the United States national physical activity plan.

    PubMed

    Evenson, Kelly R; Satinsky, Sara B

    2014-08-01

    National plans are increasingly common but infrequently evaluated. The 2010 United States National Physical Activity Plan (NPAP) provided strategies to increase population levels of physical activity. This paper describes (i) the initial accomplishments of the NPAP sector teams, and (ii) results from a process evaluation to determine how the sectors operated, their cross-sector collaboration, challenges encountered, and positive experiences. During 2011, a quarterly reporting system was developed to capture sector-level activities. A year-end interview derived more detailed information. Interviews with 12 sector leads were recorded, transcribed verbatim, and analyzed for common themes. The 6 sectors worked on goals from the implementation plan that focused broadly on education, promotion, intervention, policy, collaboration, and evaluation. Through year-end interviews, themes were generated around operations, goal setting, and cross-sector collaboration. Challenges to the NPAP work included lack of funding and time, the need for marketing and promotion, and organizational support. Positive experiences included collaboration, efficiency of work, enhanced community dynamic, and accomplishments toward NPAP goals. These initial results on the NPAP sector teams can be used as a baseline assessment for future monitoring. The lessons learned may be useful to other practitioners developing evaluations around state- or national-level plans.

  1. Sector Activities and Lessons Learned Around Initial Implementation of the United States National Physical Activity Plan

    PubMed Central

    Evenson, Kelly R.; Satinsky, Sara B.

    2016-01-01

    Background National plans are increasingly common but infrequently evaluated. The 2010 United States National Physical Activity Plan (NPAP) provided strategies to increase population levels of physical activity. This paper describes (i) the initial accomplishments of the NPAP sector teams, and (ii) results from a process evaluation to determine how the sectors operated, their cross-sector collaboration, challenges encountered, and positive experiences. Methods During 2011, a quarterly reporting system was developed to capture sector-level activities. A year-end interview derived more detailed information. Interviews with 12 sector leads were recorded, transcribed verbatim, and analyzed for common themes. Results The 6 sectors worked on goals from the implementation plan that focused broadly on education, promotion, intervention, policy, collaboration, and evaluation. Through year-end interviews, themes were generated around operations, goal setting, and cross-sector collaboration. Challenges to the NPAP work included lack of funding and time, the need for marketing and promotion, and organizational support. Positive experiences included collaboration, efficiency of work, enhanced community dynamic, and accomplishments toward NPAP goals. Conclusions These initial results on the NPAP sector teams can be used as a baseline assessment for future monitoring. The lessons learned may be useful to other practitioners developing evaluations around state- or national-level plans. PMID:24176800

  2. Research and Evaluations of the Health Aspects of Disasters, Part IX: Risk-Reduction Framework.

    PubMed

    Birnbaum, Marvin L; Daily, Elaine K; O'Rourke, Ann P; Loretti, Alessandro

    2016-06-01

    A disaster is a failure of resilience to an event. Mitigating the risks that a hazard will progress into a destructive event, or increasing the resilience of a society-at-risk, requires careful analysis, planning, and execution. The Disaster Logic Model (DLM) is used to define the value (effects, costs, and outcome(s)), impacts, and benefits of interventions directed at risk reduction. A Risk-Reduction Framework, based on the DLM, details the processes involved in hazard mitigation and/or capacity-building interventions to augment the resilience of a community or to decrease the risk that a secondary event will develop. This Framework provides the structure to systematically undertake and evaluate risk-reduction interventions. It applies to all interventions aimed at hazard mitigation and/or increasing the absorbing, buffering, or response capacities of a community-at-risk for a primary or secondary event that could result in a disaster. The Framework utilizes the structure provided by the DLM and consists of 14 steps: (1) hazards and risks identification; (2) historical perspectives and predictions; (3) selection of hazard(s) to address; (4) selection of appropriate indicators; (5) identification of current resilience standards and benchmarks; (6) assessment of the current resilience status; (7) identification of resilience needs; (8) strategic planning; (9) selection of an appropriate intervention; (10) operational planning; (11) implementation; (12) assessments of outputs; (13) synthesis; and (14) feedback. Each of these steps is a transformation process that is described in detail. Emphasis is placed on the role of Coordination and Control during planning, implementation of risk-reduction/capacity building interventions, and evaluation. Birnbaum ML , Daily EK , O'Rourke AP , Loretti A . Research and evaluations of the health aspects of disasters, part IX: Risk-Reduction Framework. Prehosp Disaster Med. 2016;31(3):309-325.

  3. Challenges on Java’s small city spatial planning

    NASA Astrophysics Data System (ADS)

    Wirawan, B.; Tambunan, J. R.

    2018-05-01

    Most Indonesians nowadays live in the urban area, due to urbanization. 60 percent of the inhabitants of Java, the most populous island in Indonesia, will live in the urban area by 2010, a figure that is higher than the national average of 55 percent. Urbanization has brought a large influx of newcomers not only into the metropolitan or large cities, but also into small and medium cities. One of urbanization’s most concerning impacts is urban sprawl that harms sustainability. There is a dearth of academic literature studying the phenomenon of urban sprawl in Indonesian small cities. Urban sprawl in small cities is commonly ignored, considered as a contained problem the solution for which is a simple use of local spatial plan. Unfortunately, for Indonesia, this solution is difficult to implement because city spatial plans works only within administrative jurisdictions, whilst the urban sprawls themselves generally occur across the borders of different administrative jurisdictions. This study studies urban sprawls occurring in several small cities in Java. While those cities already have spatial plan, most were the general spatial plan (Rencana Tata Ruang Wilayah Kota/Kabupaten) that operates only within the city’s administrative jurisdiction. We are unable to find detailed strategies in these cities to deal with urban sprawl. We also found that all spatial plans are unable to come up with urban growth boundary strategy. Finally, we are also unable to find integrated detailed spatial plan among those cities to answer the urban sprawl situation.

  4. Building a new waste management strategy in Puerto Rico

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Boltz, C.

    1995-06-01

    Puerto Rico traditionally has not had a centrally organized waste management system. Most municipalities have provided service for their own residents, and the island used 62 unlined landfills before 32 of those closed in April 1994. But waste management on this Caribbean island is changing as the government-a self-governing commonwealth associated voluntarily with the US government-begins implementing its strategy for developing efficient, state-of-the-art waste management. This strategy includes plans to build an integrated system of collection, transfer stations, and disposal sites whose centerpieces are market-drives recycling, partnerships between the public and private sectors, and public education. The details of thismore » plan coincide with the mission statement of the Puerto Rico Solid Waste Management Authority (SWMA, San Juan), to ``develop and implement the necessary infrastructure for the efficient management of solid waste in Puerto Rico.« less

  5. Validation of a hydride generation atomic absorption spectrometry methodology for determination of mercury in fish designed for application in the Brazilian national residue control plan.

    PubMed

    Damin, Isabel C F; Santo, Maria A E; Hennigen, Rosmari; Vargas, Denise M

    2013-01-01

    In the present study, a method for the determination of mercury (Hg) in fish was validated according to ISO/IEC 17025, INMETRO (Brazil), and more recent European recommendations (Commission Decision 2007/333/EC and 2002/657/EC) for implementation in the Brazilian Residue Control Plan (NRCP) in routine applications. The parameters evaluated in the validation were investigated in detail. The results obtained for limit of detection and quantification were respectively, 2.36 and 7.88 μg kg(-1) of Hg. While the recovery varies between 90-96%. The coefficient of variation was of 4.06-8.94% for the repeatability. Furthermore, a comparison using an external proficiency testing scheme was realized. The results of method validated for the determination of the mercury in fish by Hydride generation atomic absorption spectrometry were considered suitable for implementation in routine analysis.

  6. Chromospheric Lyman-Alpha SpectroPolarimeter (CLASP)

    NASA Technical Reports Server (NTRS)

    Kano, Ryohei; Bando, Takamasa; Narukage, Noriyuki; Ishikawa, Ryoko; Kubo, Masahito; Katsukawa, Yukio; Ishikawa, Shin-­nosuke; Hara, Hirohisa; Suematsu, Yoshinori; Giono, Gabriel; hide

    2015-01-01

    Chromosphere, the transition layer of the sun is a region to switch to the magnetic pressure dominated from plasma pressure dominated, simultaneous observation of the detailed magnetic field measurement and plasma of dynamic phenomenon here is what is the frontier of the next solar physics. As This is a challenge that has just mentioned, even the next solar observation satellite plan SOLAR-C, in the experiments we had used a NASA sounding rocket for the first time in the SOLAR-C plan, will address the chromosphere-transition layer magnetic field measurement there. It is, is a Chromospheric Lyman-Alpha Spectro-Polarimeter (CLASP) plan, the linear polarization of Lyman ?? emission lines chromosphere-transition layer shoots (121.6nm) were detected in 0.1 percent of high accuracy, a new technique called Hanre effect I get the magnetic field information of chromosphere-transition layer. In Japan, the US and Europe joint observation in November 2012 as a rocket experiment is adopted to NASA this plan that full-scale start-up, start from assembly work is 2014 spring flight observation device, currently, it is where the alignment of the optical elements have been implemented. After this, it is planned to continue with the performance evaluation towards the observation implementation of summer 2015. In addition to once again explain the contents of the plan In this presentation, we report an overview of the entire development and preparation current status.

  7. Sustainability in a Hospital-Based Biobank and University-Based DNA Biorepository: Strategic Roadmaps.

    PubMed

    Seiler, Catherine Y; Eschbacher, Jennifer; Bowser, Robert; LaBaer, Joshua

    2015-12-01

    Sustainability in the biobanking community has recently become an important and oft-discussed issue as biorepositories struggle to balance limited external funding and complex cost recovery models with high operating costs and the desire to provide the highest quality materials and services to the research community. A multi-faceted view of biobanking sustainability requires consideration of operational and social sustainability in addition to the historical focus exclusively on financial sustainability. Planning and implementing this three pillar model creates a well-rounded biorepository that meets the needs of all the major stakeholders: the funders, the patients/depositors, and the researcher recipients. Often the creation of a detailed business plan is the first step to develop goals and objectives that lead down a path towards sustainability. The definition of sustainability and the complexity of a sustainable business plan may differ for each biorepository. The DNASU Plasmid Repository at Arizona State University stores and distributes DNA plasmids to researchers worldwide, and the Biobank Core Facility at St. Joseph's Hospital and Barrow Neurological Institute consents patients and collects, stores, and distributes human tissue and blood samples. We will discuss these two biorepositories, their similar and different approaches to sustainability and business planning, their challenges in creating and implementing their sustainability plan, and their responses to some of these challenges. From these experiences, the biobanks share lessons learned about planning for sustainability that are applicable to all biorepositories.

  8. Transposition and implementation of EU rare disease policy in Eastern Europe.

    PubMed

    Pejcic, Ana V; Iskrov, Georgi; Raycheva, Ralitsa; Stefanov, Rumen; Jakovljevic, Mihajlo Michael

    2017-12-01

    А series of European Union (EU) political decisions have made rare diseases one of the cornerstones of the common European health policy. Adopted in 2009, Council Recommendation on an action in the field of rare diseases aimed to serve as a policy-making guideline. However, the implementation report, which followed it, neither performed detailed cross-country comparison, nor assessed the impact of the policies. Areas covered: A 10-indicator set was elaborated to structure the review and to describe rare disease activities in 14 Eastern European countries. Expert commentary: Taking into account all indicators, EU member states outperform candidate and potential candidate countries in terms of rare disease policy planning and implementation. Hungary is the top performer, followed by Bulgaria and Czech Republic. Non-EU countries form the bottom tier, with Serbia being the best ranked among them. While EU adhesion is a major facilitator for planning and adopting rare disease policies, local stakeholders are the triggering factor for their successful implementation. European reference networks are likely to be the future of rare disease activities in the EU. They need to synchronize and closely collaborate with all important EU projects in the field of rare diseases if they are to achieve their objectives.

  9. Visible, Durable, Enforceable Institutional Controls: Weldon Spring Site - A 10-Year Journey - 13190

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Uhlmeyer, Terri; Thompson, Randy; Starr, Ken

    2013-07-01

    The DOE Office of Legacy Management's (LM's) mission is to manage the DOE's post-closure responsibilities and ensure the future protection of human health and the environment. LM has control and custody of legacy land, structures, and facilities and is responsible for maintaining them at levels suitable for their long-term use. This includes all engineered and institutional controls (ICs) designed as another level of assurance to prevent exposure to residual contamination and waste. The development and management of ICs has been, and continues to be, a critical component to the success of LM surveillance and maintenance activities. Many major federal laws,more » Executive Orders, regulations, and various other drivers influence the establishment and use of ICs at LM sites. LM uses a wide range of ICs to appropriately limit access to, or uses of, land, facilities, and other real and personal properties; protect the environment; maintain the physical safety and security of DOE facilities; and prevent or limit inadvertent human and environmental exposure to residual contaminants and other hazards. The ICs at the Weldon Spring, Missouri, Site were developed in close coordination with federal and state regulators. An Explanation of Significant Differences (ESD) was issued in February 2005, which clarified the use restrictions necessary for the remedial actions specified in the Records of Decision for the separate operable units to remain protective over the long-term. The operable units included the Chemical Plant Operable Unit, the Chemical Plant Groundwater Operable Unit, and the Quarry Residuals Operable Unit. The ESD clarified specific requirements for each site area that needed use restrictions and established how DOE would implement, maintain, and monitor the specific requirements. DOE developed the Long-Term Surveillance and Maintenance Plan for the U.S. Department of Energy Weldon Spring, Missouri, Site (LTS and M Plan) that addressed the full scope of the site management activities necessary to ensure that the Weldon Spring Site remains protective over the long-term. The LTS and M Plan is revised periodically to ensure its applicability to changing site, regulatory, or procedural conditions. In addition to addressing such activities as long-term groundwater monitoring and disposal cell maintenance, the LTS and M Plan was developed and issued to ensure that the use restrictions identified in the ESD were properly imposed and maintained. The LTS and M Plan included a detailed IC Implementation Plan, which includes a process for evaluating and identifying specific IC mechanisms that best accomplish the objectives set out in the ESD. Consistent with EPA guidance on selecting ICs, various IC mechanisms were evaluated, including government controls, proprietary controls, enforcement tools, and informational devices. Where appropriate, redundant mechanisms were employed to increase the effectiveness of the ICs. Information in the IC Implementation Plan includes: (1) a discussion of current site conditions (reflecting post-remedial action conditions for the Chemical Plant and Quarry Areas and the risk-basis for why use restrictions are needed); (2) the objectives of, or performance expectations for, the use restrictions; (3) specific ICs already in place and additional mechanisms identified for implementation; (4) a schedule for implementing additional ICs; (5) procedures for maintaining the ICs and for conducting periodic inspections; and (6) general provisions for the implementing ICs for the site. The actual agreements and documentation of the various ICs are included in an appendix of the LTS and M Plan. These documents are also available via the internet from the authorizing agencies (County, Missouri Department of Natural Resources, EPA, etc.) The Weldon Spring Site personnel have been successful in finalizing each of the ICs that were established for the site. The planning, establishment, and implementation of the ICs was a long and detailed process with several lessons-learned that were identified along the way. (authors)« less

  10. What Every Girl Needs To Know about the Real World. Breakthrough Strategies To Teach and Counsel Troubled Youth. Social Skills, School Skills, Coping Skills Lesson Series.

    ERIC Educational Resources Information Center

    Wells, Ruth Herman

    This booklet, containing 20 lessons that address social skills, is designed for use by teachers and counselors working with female troubled youth. Each lesson plan provides a goal, a list of materials and detailed directions on how to implement the lesson. Several handouts that accompany the lessons are included. Lesson goals include: introducing…

  11. Coalitions, Negotiations and the ComField Model, Appendix E. Vol. II, A Plan for Managing the Development, Implementation and Operation of a Model Elementary Teacher Education Program.

    ERIC Educational Resources Information Center

    Farr, Helen L. K.

    After defining the terms to be discussed (coalition and negotiation), this paper considers in detail some of the kinds of coalition most relevant to the ComField model. The kinds of coalitions include those in professional education, such as professional associations and consortia; nonprofessional coalitions of citizen groups and student groups;…

  12. Evaluation of Free To Grow, Phase II: Detailed Profile of the Free To Grow Project in California. Final Report.

    ERIC Educational Resources Information Center

    Harrington, Mary

    The Free to Grow pilot project, developed by the Charles R. Drew University of Medicine and Science and its Head Start project, operated between 1994 and 1999. Following a 2-year planning and development stage, 5 project sites went on to complete the 3-year implementation phase in California, Colorado, Kentucky, New York, and Puerto Rico; the…

  13. Toward an Evaluation Framework for Doctoral Education in Social Work: A 10-Year Retrospective of One PhD Program's Assessment Experiences

    ERIC Educational Resources Information Center

    Bentley, Kia J.

    2013-01-01

    This article presents a framework for evaluation in social work doctoral education and details 10 years of successes and challenges in one PhD program's use of the framework, including planning and implementing specific assessment activities around student learning outcomes and larger program goals. The article argues that a range of…

  14. Quarterly Performance/Technical Report of the National Marrow Donor Program

    DTIC Science & Technology

    2010-03-31

    Implemented the Business to Business ( B2B ) Gateway and Business Services to support : • Incoming HLA typing results incorporating HLA Nomenclature changes...maintenance was performed. IIA.3.2 Task 2: Critical Facility and Staff Related Functions Period 6 Activity: • Business Continuity Planning: o Continued...department development of appropriate detailed tasks to be tested at a remote (non-NMDP controlled) location for the 2010 Business Continuity

  15. Planning for the Leicester City Football Club victory parade.

    PubMed

    Halse, Martin

    2017-01-01

    This paper details the multiagency planning for and delivery of the Leicester City Football Club victory parade at the end of the 2015/16 football season to celebrate the team winning the Barclays Premier League. This is compared and contrasted with the planning and delivery of the reinterment of the mortal remains of King Richard III, which took place in Leicester a little more than 12 months prior. Both events were unprecedentedly high-profile for a comparatively small city and the routes involved had much in common. However, the amount of time to plan each event differed greatly: approximately 18 months for the reinterment and just five weeks for the victory parade. The events were largely un-ticketed but with very different crowd profiles. This paper describes the background to both events; their context and setting; the structure of the planning groups; contingency planning considerations and implementation; pre-event exercises; command, control and coordination arrangements; business continuity issues; communications and lessons learned.

  16. A terrorism response plan for hospital security and safety officers.

    PubMed

    White, Donald E

    2002-01-01

    Security and Safety managers in today's healthcare facilities need to factor terrorism response into their emergency management plans, separate from the customary disaster plans and the comparatively recent security plans. Terrorism incidents will likely be security occurrences that use a weapon of mass destruction to magnify the incidents into disasters. Facility Y2K Plans can provide an excellent framework for the detailed contingency planning needed for terrorism response by healthcare facilities. Tabbed binder notebooks, with bulleted procedures and contact points for each functional section, can provide security and safety officers with at-a-glance instructions for quick 24/7 implementation. Each functional section should focus upon what activities or severity levels trigger activation of the backup processes. Network with your countywide, regional, and/or state organizations to learn what your peers are doing. Comprehensively inventory your state, local, and commercial resources so that you have alternate providers readily available 24/7 to assist your facility upon disasters.

  17. The Devil is in the Concepts: Lessons Learned from World War II Planning Staffs for Transitioning from Conceptual to Detailed Planning

    DTIC Science & Technology

    2017-05-25

    the planning process. Current US Army doctrine links conceptual planning to the Army Design Methodology and detailed planning to the Military...Decision Making Process. By associating conceptual and detailed planning with doctrinal methodologies , it is easy to regard the transition as a set period...plans into detailed directives resulting in changes to the operational environment. 15. SUBJECT TERMS Design; Army Design Methodology ; Conceptual

  18. An international review of the challenges associated with securing 'buy-in' for water safety plans within providers of drinking water supplies.

    PubMed

    Summerill, Corinna; Smith, Jen; Webster, James; Pollard, Simon

    2010-06-01

    Since publication of the 3rd Edition of the World Health Organisation (WHO) Drinking Water Quality guidelines, global adoption of water safety plans (WSPs) has been gathering momentum. Most guidance lists managerial commitment and 'buy-in' as critical to the success of WSP implementation; yet the detail on how to generate it is lacking. This commentary discusses aspects of managerial commitment to WSPs. We argue that the public health motivator should be clearer and a paramount objective and not lost among other, albeit legitimate, drivers such as political or regulatory pressures and financial efficiency.

  19. Managing Canine Aggression in the Home.

    PubMed

    Pike, Amy

    2018-05-01

    Canine aggression occurring in the home can be a dangerous diagnosis with costly consequences to all members of the household. Management is a key modality in the treatment of canine aggression in the home. A thorough history will detail each trigger, target, and context and allow for the veterinary team to put together a comprehensive management plan. Management allows for the avoidance of future aggressive episodes and minimizes the risks associated with living with a patient with these diagnoses. Although risk cannot be mitigated 100%, thorough management can create a safe environment for the implementation of the behavior treatment plan. Copyright © 2017 Elsevier Inc. All rights reserved.

  20. Structure, Intent and Conformance Monitoring in ATC

    NASA Technical Reports Server (NTRS)

    Reynolds, Tom G.; Histon, Jonathan M.; Davison, Hayley J.; Hansman, R. John

    2004-01-01

    Infield studies of current Air Traffic Control operations it is found that controllers rely on underlying airspace structure to reduce the complexity of the planning and conformance monitoring tasks. The structure appears to influence the controller's working mental model through abstractions that reduce the apparent cognitive complexity. These structure-based abstractions are useful for the controller's key tasks of planning, implementing, monitoring, and evaluating tactical situations. In addition, the structure-based abstractions appear to be important in the maintenance of Situation Awareness. The process of conformance monitoring is analyzed in more detail and an approach to conformance monitoring which utilizes both the structure-based abstractions and intent is presented.

  1. Lessons on humanitarian assistance.

    PubMed Central

    Gracia Antequera, M.; Morales Suárez-Varela, M.

    1999-01-01

    Conflict almost completely destroyed Rwanda's infrastructure in 1994. Natural disasters, as well as disasters caused by humans, have severely challenged humanitarian aid available within the country. In this study, we have analysed the experiences of nongovernmental organizations since the summer of 1994 to evaluate how these difficulties may be overcome. One of the problems identified has been restrictions on the ability to introduce effective health planning due to the poor quality of available local information. The implementation of effective plans that show due consideration to the environment and society is clearly necessary. Effective monitoring and detailed observation are identified as being essential to the continuity of existing humanitarian assistance. PMID:10444885

  2. The Kuwait Oil Fire Health Risk Assessment Biological Surveillance Initiative.

    PubMed

    Deeter, David P

    2011-07-01

    An important environmental concern during the first Gulf War (Operation Desert Storm) was assessing exposures and potential health effects in U.S. forces exposed to the Kuwait oil fires. With only 3 weeks for planning, a Biological Surveillance Initiative (BSI) was developed and implemented for a U.S. Army unit. The BSI included blood and urine collections, questionnaire administration, and other elements during the predeployment, deployment, and post-deployment phases. Many BSI objectives were accomplished. Difficulties encountered included planning failures, loss of data and information, and difficulty in interpreting laboratory results. In order for biological surveillance initiatives to provide useful information for future deployments where environmental exposures may be a concern, meaningful, detailed, and realistic planning and preparation must occur long before the deployment is initiated.

  3. User's manual for a fuel-conservative descent planning algorithm implemented on a small programmable calculator

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Vicroy, D.D.

    A simplified flight management descent algorithm was developed and programmed on a small programmable calculator. It was designed to aid the pilot in planning and executing a fuel conservative descent to arrive at a metering fix at a time designated by the air traffic control system. The algorithm may also be used for planning fuel conservative descents when time is not a consideration. The descent path was calculated for a constant Mach/airspeed schedule from linear approximations of airplane performance with considerations given for gross weight, wind, and nonstandard temperature effects. An explanation and examples of how the algorithm is used,more » as well as a detailed flow chart and listing of the algorithm are contained.« less

  4. APGEN Version 5.0

    NASA Technical Reports Server (NTRS)

    Maldague, Pierre; Page, Dennis; Chase, Adam

    2005-01-01

    Activity Plan Generator (APGEN), now at version 5.0, is a computer program that assists in generating an integrated plan of activities for a spacecraft mission that does not oversubscribe spacecraft and ground resources. APGEN generates an interactive display, through which the user can easily create or modify the plan. The display summarizes the plan by means of a time line, whereon each activity is represented by a bar stretched between its beginning and ending times. Activities can be added, deleted, and modified via simple mouse and keyboard actions. The use of resources can be viewed on resource graphs. Resource and activity constraints can be checked. Types of activities, resources, and constraints are defined by simple text files, which the user can modify. In one of two modes of operation, APGEN acts as a planning expert assistant, displaying the plan and identifying problems in the plan. The user is in charge of creating and modifying the plan. In the other mode, APGEN automatically creates a plan that does not oversubscribe resources. The user can then manually modify the plan. APGEN is designed to interact with other software that generates sequences of timed commands for implementing details of planned activities.

  5. The components of action planning and their associations with behavior and health outcomes.

    PubMed

    Lorig, Kate; Laurent, Diana D; Plant, Kathryn; Krishnan, Eswar; Ritter, Philip L

    2014-03-01

    Based on the works of Kiesler and Bandura, action plans have become important tools in patient self-management programs. One such program, shown effective in randomized trials, is the Internet Chronic Disease Self-Management Program. An implementation of this program, Healthy Living Canada, included detailed information on action plans and health-related outcome measures. Action plans were coded by type, and associations between action plans, confidence in completion and completion were examined. Numbers of Action Plans attempted and competed and completion rates were calculated for participants and compared to six-month changes in outcomes using regression models. Five of seven outcome measures significantly improved at six-months. A total of 1136 action plans were posted by 254 participants in 12 workshops (mean 3.9 out of 5 possible); 59% of action plans involved exercise, 16% food, and 14% role management. Confidence of completion was associated with completion. Action plan completion measures were associated with improvements in activity limitation, aerobic exercise, and self-efficacy. Baseline self-efficacy was associated with at least partial completion of action plans. Action planning appears to be an important component of self-management interventions, with successful completion associated with improved health and self-efficacy outcomes.

  6. Disaster preparedness in biocontainment animal research facilities: developing and implementing an incident response plan (IRP).

    PubMed

    Swearengen, James R; Vargas, Karen J; Tate, Mallory K; Linde, N S

    2010-01-01

    Preparing for the wide variety of disasters that can occur is challenging for any animal research facility, but the level of concern for human and animal health rises significantly when infectious agents and toxins are part of the scenario. Federal regulations provide detailed requirements for the development of an incident response plan (IRP) when select agents and toxins (SATs) are used. In addition to the usual issues associated with disaster planning, the IRP must address concerns associated with the potential theft, loss, or release of SATs that may affect both institutional personnel and the surrounding community. The level of detail in the IRP and the intensity of training should be appropriate for the level of risk involved. Regulations describe certain basic requirements but do not address the risks of SAT-exposed animals, which have been the subject of additional guidance to help implement regulatory requirements. A 2008 joint publication of the Centers for Disease Control and Prevention and the Animal and Plant Health Inspection Service describes scenarios in which SAT-exposed animals are handled in the same manner as the agent or toxin itself for the purpose of reporting a SAT theft, loss, or release. Events that resulted from the impact of Hurricane Ike at the University of Texas Medical Branch in Galveston provide a valuable opportunity to evaluate the effectiveness of the federal regulations and to build on lessons learned from this disaster. These lessons can help to supplement the regulatory requirements and improve the safety and security of handling both SATs and animals exposed to them during and after an emergency situation.

  7. Military Personnel: DOD Needs to Take Further Actions to Prevent Sexual Assault During Initial Military Training

    DTIC Science & Technology

    2014-09-01

    health care providers affected whether servicemembers who are victims of sexual assault can or do access mental health services. We made nine...victims’ access to mental health care ; and evaluate appropriate staffing levels of certain sexual assault response-related positions. DOD concurred with...Defense Health Care Reform: Additional Implementation Details Would Increase Transparency of DOD’s Plans and Enhance Accountability, GAO-14-49 (Washington

  8. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kurnik, Charles W.; Stoughton, Kate M; Figueroa, Jorge

    This measurement and verification (M&V) protocol provides procedures for energy service companies (ESCOs) and water efficiency service companies (WESCOs) to determine water savings resulting from water conservation measures (WCMs) in energy performance contracts associated with outdoor irrigation efficiency projects. The water savings are determined by comparing the baseline water use to the water use after the WCM has been implemented. This protocol outlines the basic structure of the M&V plan, and details the procedures to use to determine water savings.

  9. Sandia National Laboratories California Waste Management Program Annual Report February 2008.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Brynildson, Mark E.

    The annual program report provides detailed information about all aspects of the Sandia National Laboratories, California (SNL/CA) Waste Management Program. It functions as supporting documentation to the SNL/CA Environmental Management System Program Manual. This annual program report describes the activities undertaken during the past year, and activities planned in future years to implement the Waste Management (WM) Program, one of six programs that supports environmental management at SNL/CA.

  10. A primer for effective organization of professional conferences.

    PubMed

    Werner, Susan E; Kenefick, Colleen

    2005-01-01

    The challenge of organizing a successful conference is a tremendous commitment requiring extensive preparation and teamwork. It is tempting but dangerous to underestimate the details needed to coordinate an outstanding event. Conferences follow a natural life cycle from proposal, gaining administrative support, planning, implementing, and then finally evaluating outcomes. These guidelines identify the tasks and areas of responsibilities required including setting objectives, budgeting, selecting a venue, publicity, programming, and working with vendors.

  11. HAL/S-360 compiler test activity report

    NASA Technical Reports Server (NTRS)

    Helmers, C. T.

    1974-01-01

    The levels of testing employed in verifying the HAL/S-360 compiler were as follows: (1) typical applications program case testing; (2) functional testing of the compiler system and its generated code; and (3) machine oriented testing of compiler implementation on operational computers. Details of the initial test plan and subsequent adaptation are reported, along with complete test results for each phase which examined the production of object codes for every possible source statement.

  12. Clinical professional governance for detailed clinical models.

    PubMed

    Goossen, William; Goossen-Baremans, Anneke

    2013-01-01

    This chapter describes the need for Detailed Clinical Models for contemporary Electronic Health Systems, data exchange and data reuse. It starts with an explanation of the components related to Detailed Clinical Models with a brief summary of knowledge representation, including terminologies representing clinic relevant "things" in the real world, and information models that abstract these in order to let computers process data about these things. Next, Detailed Clinical Models are defined and their purpose is described. It builds on existing developments around the world and accumulates in current work to create a technical specification at the level of the International Standards Organization. The core components of properly expressed Detailed Clinical Models are illustrated, including clinical knowledge and context, data element specification, code bindings to terminologies and meta-information about authors, versioning among others. Detailed Clinical Models to date are heavily based on user requirements and specify the conceptual and logical levels of modelling. It is not precise enough for specific implementations, which requires an additional step. However, this allows Detailed Clinical Models to serve as specifications for many different kinds of implementations. Examples of Detailed Clinical Models are presented both in text and in Unified Modelling Language. Detailed Clinical Models can be positioned in health information architectures, where they serve at the most detailed granular level. The chapter ends with examples of projects that create and deploy Detailed Clinical Models. All have in common that they can often reuse materials from earlier projects, and that strict governance of these models is essential to use them safely in health care information and communication technology. Clinical validation is one point of such governance, and model testing another. The Plan Do Check Act cycle can be applied for governance of Detailed Clinical Models. Finally, collections of clinical models do require a repository in which they can be stored, searched, and maintained. Governance of Detailed Clinical Models is required at local, national, and international levels.

  13. 78 FR 28776 - Approval and Promulgation of Implementation Plans; Georgia; State Implementation Plan...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-16

    ... Section of this Federal Register, EPA is approving the State's implementation plan revision as a direct... Promulgation of Implementation Plans; Georgia; State Implementation Plan Miscellaneous Revisions AGENCY... State Implementation Plan (SIP) submitted by the Georgia Environmental Protection Division to EPA in...

  14. Projections, plans, policies and politics in Prince George: reflections on five years of climate change adaptation in a northern Canadian community

    NASA Astrophysics Data System (ADS)

    Picketts, I. M.; Dery, S. J.; Curry, J.

    2013-12-01

    The City of Prince George, in central British Columbia, Canada, has partnered with academics and collaborators for over five years to address climate change adaptation at the local level. The first phase of research involved conducting a detailed overview of past climate trends and future projections for the region using the outputs of GCMs and downscaled RCMs. This information was communicated to senior local staff and community members, and feedback was applied to create a detailed adaptation strategy for the City, which identified priority impacts and outlined potential strategies to address them at the local level. The top priority impacts for Prince George are forest changes, increased flooding, and impacts to transportation infrastructure. During a second implementation phase of the project, eight local initiatives were completed focusing on: incorporating adaptation into a local sustainability plan and land use plan; exploring impacts related to forests, flooding and transportation infrastructure; and assessing trends and projections in freeze-thaw cycles and heavy rainfall events. This presentation will outline the adaptation initiatives undertaken in the City of Prince George during the second phase of research, and evaluate their effectiveness through reflections from interviews with local planners, engineers, managers, community champions and politicians. The initiatives deemed to be most successful - and most likely to be implemented - focus on topics that: are of high public concern; have clear cost implications; incorporate adaptation into policy; and/or incorporate adaptation into an ongoing project. Outcomes highlight challenges local researchers, practitioners and leaders face as they strive to implement proactive adaptation measures in policy and practice without strong support from policy and professional practices, and with a paucity of successful case study examples to build upon. Outcomes also reveal challenges as municipalities strive to do ';more with less' and work within the reality that adaptation is not generally a high public or political priority. Internal capacity and external support are vital for adaptation success at the local level.

  15. ASEAN GMP and pharmaceutical industries in Indonesia.

    PubMed

    Soesilo, S; Sitorus, U

    1995-01-01

    Indonesia was appointed by the ASEAN Technical Cooperation in Pharmaceutical as a focal point and to coordinate the development of practical guidelines for the implementation of GMP. The ASEAN GMP Guidelines were endorsed by the ASEAN Technical Cooperation in Pharmaceutical in 1988, which among others required separation of Beta-Lactam dedicated facilities and three degrees of cleanliness for production areas. As it was realised that drug manufacturers in developing countries need more detailed guidelines to be able to implement the GMP, an Operational Manual for GMP was also prepared for providing examples of SOPs lay-outs, documentation etc. It was agreed by the technical cooperation group to leave the implementation of GMP to each member country. However, the ASEAN Manual for Inspection of GMP was drafted and endorsed by the group and training of ASEAN Drug Inspectors was organized to support the implementation. The ASEAN GMP is being implemented in Indonesia through a five-year, stepwise implementation plan, starting in 1989.

  16. Implementation of a national anti-tuberculosis drug resistance survey in Tanzania.

    PubMed

    Chonde, Timothy M; Doulla, Basra; van Leth, Frank; Mfinanga, Sayoki G M; Range, Nyagosya; Lwilla, Fred; Mfaume, Saidi M; van Deun, Armand; Zignol, Matteo; Cobelens, Frank G; Egwaga, Saidi M

    2008-12-30

    A drug resistance survey is an essential public health management tool for evaluating and improving the performance of National Tuberculosis control programmes. The current manuscript describes the implementation of the first national drug resistance survey in Tanzania. Description of the implementation process of a national anti-tuberculosis drug resistance survey in Tanzania, in relation to the study protocol and Standard Operating Procedures. Factors contributing positively to the implementation of the survey were a continuous commitment of the key stakeholders, the existence of a well organized National Tuberculosis Programme, and a detailed design of cluster-specific arrangements for rapid sputum transportation. Factors contributing negatively to the implementation were a long delay between training and actual survey activities, limited monitoring of activities, and an unclear design of the data capture forms leading to difficulties in form-filling. Careful preparation of the survey, timing of planned activities, a strong emphasis on data capture tools and data management, and timely supervision are essential for a proper implementation of a national drug resistance survey.

  17. Sampling and Analysis Plan for U.S. Department of Energy Office of Legacy Management Sites

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    2012-10-24

    This plan incorporates U.S. Department of Energy (DOE) Office of Legacy Management (LM) standard operating procedures (SOPs) into environmental monitoring activities and will be implemented at all sites managed by LM. This document provides detailed procedures for the field sampling teams so that samples are collected in a consistent and technically defensible manner. Site-specific plans (e.g., long-term surveillance and maintenance plans, environmental monitoring plans) document background information and establish the basis for sampling and monitoring activities. Information will be included in site-specific tabbed sections to this plan, which identify sample locations, sample frequencies, types of samples, field measurements, and associatedmore » analytes for each site. Additionally, within each tabbed section, program directives will be included, when developed, to establish additional site-specific requirements to modify or clarify requirements in this plan as they apply to the corresponding site. A flowchart detailing project tasks required to accomplish routine sampling is displayed in Figure 1. LM environmental procedures are contained in the Environmental Procedures Catalog (LMS/PRO/S04325), which incorporates American Society for Testing and Materials (ASTM), DOE, and U.S. Environmental Protection Agency (EPA) guidance. Specific procedures used for groundwater and surface water monitoring are included in Appendix A. If other environmental media are monitored, SOPs used for air, soil/sediment, and biota monitoring can be found in the site-specific tabbed sections in Appendix D or in site-specific documents. The procedures in the Environmental Procedures Catalog are intended as general guidance and require additional detail from planning documents in order to be complete; the following sections fulfill that function and specify additional procedural requirements to form SOPs. Routine revision of this Sampling and Analysis Plan will be conducted annually at the beginning of each fiscal year when attachments in Appendix D, including program directives and sampling location/analytical tables, will be reviewed by project personnel and updated. The sampling location/analytical tables in Appendix D, however, may have interim updates according to project direction that are not reflected in this plan. Deviations from location/analytical tables in Appendix D prior to sampling will be documented in project correspondence (e.g., startup letters). If significant changes to other aspects of this plan are required before the annual update, then the plan will be revised as needed.« less

  18. The development and implementation of a strategic and tactical planning framework at Mayo Clinic Arizona.

    PubMed

    Frey, Keith; Cranmer, John Jack; Kirby, Lani J; Lenko, Paul H; Vrabel, Amy Z

    2005-01-01

    This article describes the Mayo Arizona process for developing an information technology strategic plan. The background of organizational events that gave rise to this strategic planning process is presented. A cross-functional team of key IT stakeholders was convened; the team used a facilitated process to derive a pro forma set of IT strategic objectives from the larger organization's emerging strategic plan. A broad set of leadership interviews was conducted to further identify detailed objectives that would confirm, complement, or conflict with the "strawperson." The IT strategic objectives then were refined and published by the organization. The article also describes the annual process of reviewing the IT strategic plan and translating it to a set of tactical objectives. This includes the committee structure for project prioritization, which is guided by the IT strategic plan. The outcome of the prioritization process is a five-year IT tactical plan, which is used to communicate the IT action plan for achievement of the strategic objectives. The strategic and tactical plans have resulted in stronger ownership and advocacy of IT activities by organizational leadership and a clearer view of the impact of technology on the organization's strategic plan.

  19. Northwest Montana Wildlife Habitat Enhancement: Hungry Horse Elk Mitigation Project: Monitoring and Evaluation Plan.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Casey, Daniel; Malta, Patrick

    Portions of two important elk (Cervus elaphus) winter ranges totalling 8749 acres were lost due to the construction of the Hungry Horse Dam hydroelectric facility. This habitat loss decreased the carrying capacity of the both the elk and the mule deer (Odocoileus hemionus). In 1985, using funds from the Bonneville Power Administration (BPA) as authorized by the Northwest Power Act, the Montana Department of Fish, Wildlife and Parks (FWP) completed a wildlife mitigation plan for Hungry Horse Reservoir. This plan identified habitat enhancement of currently-occupied winter range as the most cost-efficient, easily implemented mitigation alternative available to address these large-scalemore » losses of winter range. The Columbia Basin Fish and Wildlife Program, as amended in 1987, authorized BPA to fund winter range enhancement to meet an adjusted goal of 133 additional elk. A 28-month advance design phase of the BPA-funded project was initiated in September 1987. Primary goals of this phase of the project included detailed literature review, identification of enhancement areas, baseline (elk population and habitat) data collection, and preparation of 3-year and 10-year implementation plans. This document will serve as a site-specific habitat and population monitoring plan which outlines our recommendations for evaluating the results of enhancement efforts against mitigation goals. 25 refs., 13 figs., 7 tabs.« less

  20. Intervention Mapping to Adapt Evidence-Based Interventions for Use in Practice: Increasing Mammography among African American Women.

    PubMed

    Highfield, Linda; Hartman, Marieke A; Mullen, Patricia Dolan; Rodriguez, Serena A; Fernandez, Maria E; Bartholomew, L Kay

    2015-01-01

    This paper describes and demonstrates the use of the systematic planning process, Intervention Mapping, to adapt an evidence-based public health intervention (EBI). We used a simplified version of Intervention Mapping (IM Adapt) to increase an intervention's fit with a new setting and population. IM Adapt guides researchers and practitioners in selecting an EBI, making decisions about whether and what to adapt, and executing the adaptation while guarding the EBI's essential elements (those responsible for effectiveness). We present a case study of a project in which we used IM Adapt to find, adapt, implement, and evaluate an EBI to improve mammography adherence for African American women in a new practice setting in Houston, Texas. IM Adapt includes the following (1) assess needs and organizational capacity; (2) find EBIs; (3) plan adaptations based on fit assessments; (4) make adaptations; (5) plan for implementation; and (6) plan for evaluation of the adapted EBI. The case study shows an example of how public health researchers and practitioners can use the tool to make it easier to find and use EBIs, thus encouraging greater uptake. IM Adapt adds to existing dissemination and adaptation models by providing detailed guidance on how to decide on effective adaptation, while maintaining the essential elements of the EBI.

  1. Intervention Mapping to Adapt Evidence-Based Interventions for Use in Practice: Increasing Mammography among African American Women

    PubMed Central

    Highfield, Linda; Hartman, Marieke A.; Mullen, Patricia Dolan; Fernandez, Maria E.; Bartholomew, L. Kay

    2015-01-01

    This paper describes and demonstrates the use of the systematic planning process, Intervention Mapping, to adapt an evidence-based public health intervention (EBI). We used a simplified version of Intervention Mapping (IM Adapt) to increase an intervention's fit with a new setting and population. IM Adapt guides researchers and practitioners in selecting an EBI, making decisions about whether and what to adapt, and executing the adaptation while guarding the EBI's essential elements (those responsible for effectiveness). We present a case study of a project in which we used IM Adapt to find, adapt, implement, and evaluate an EBI to improve mammography adherence for African American women in a new practice setting in Houston, Texas. IM Adapt includes the following (1) assess needs and organizational capacity; (2) find EBIs; (3) plan adaptations based on fit assessments; (4) make adaptations; (5) plan for implementation; and (6) plan for evaluation of the adapted EBI. The case study shows an example of how public health researchers and practitioners can use the tool to make it easier to find and use EBIs, thus encouraging greater uptake. IM Adapt adds to existing dissemination and adaptation models by providing detailed guidance on how to decide on effective adaptation, while maintaining the essential elements of the EBI. PMID:26587531

  2. Extended-Release Naltrexone: A Qualitative Analysis of Barriers to Routine Use.

    PubMed

    Alanis-Hirsch, Kelly; Croff, Raina; Ford, James H; Johnson, Kim; Chalk, Mady; Schmidt, Laura; McCarty, Dennis

    2016-03-01

    The Medication Research Partnership (a national health plan and nine addiction treatment centers contracted with the health plan) sought to facilitate the adoption of pharmacotherapy for alcohol and opioid use disorders. Qualitative analysis of interviews with treatment center change leaders, individuals working for the manufacturer and its technical assistance contractor, and health plan managers extracted details on the processes used to order, store, bill for, and administer extended-release naltrexone. Qualitative themes were categorized using domains from the Consolidated Framework for Implementation Research (intervention characteristics, outer setting, inner setting, and provider characteristics). Characteristics of XR-NTX that inhibited use included the complexity of ordering and using the medication; cost was also a barrier. Outer setting barriers reflected patient needs and external health plan policies on formulary coverage, benefit management, and reimbursement. Program structures, the lack of physician linkages, a culture resistant to the use of medication, and unease with change were inner setting elements that limited use of XR-NTX. Patient stereotypes and a lack of knowledge about XR-NTX affected practitioner willingness to treat patients and prescribe XR-NTX. The Consolidated Framework for Implementation Research provided a useful lens to understand and interpret the processes affecting access to XR-NTX. Copyright © 2015 Elsevier Inc. All rights reserved.

  3. U.S. Virgin Islands Petroleum Price-Spike Preparation

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Johnson, C.

    2012-06-01

    This NREL technical report details a plan for the U.S. Virgin Islands (USVI) to minimize the economic damage caused by major petroleum price increases. The assumptions for this plan are that the USVI will have very little time and money to implement it and that the population will be highly motivated to follow it because of high fuel prices. The plan's success, therefore, is highly dependent on behavior change. This plan was derived largely from a review of the actions taken and behavior changes made by companies and commuters throughout the United States in response to the oil price spikemore » of 2008. Many of these solutions were coordinated by or reported through the 88 local representatives of the U.S. Department of Energy's Clean Cities program. The National Renewable Energy Laboratory provides technical and communications support for the Clean Cities program and therefore serves as a de facto repository of these solutions. This plan is the first publication that has tapped this repository.« less

  4. Sustainability in a Hospital-Based Biobank and University-Based DNA Biorepository: Strategic Roadmaps

    PubMed Central

    Eschbacher, Jennifer; Bowser, Robert; LaBaer, Joshua

    2015-01-01

    Sustainability in the biobanking community has recently become an important and oft-discussed issue as biorepositories struggle to balance limited external funding and complex cost recovery models with high operating costs and the desire to provide the highest quality materials and services to the research community. A multi-faceted view of biobanking sustainability requires consideration of operational and social sustainability in addition to the historical focus exclusively on financial sustainability. Planning and implementing this three pillar model creates a well-rounded biorepository that meets the needs of all the major stakeholders: the funders, the patients/depositors, and the researcher recipients. Often the creation of a detailed business plan is the first step to develop goals and objectives that lead down a path towards sustainability. The definition of sustainability and the complexity of a sustainable business plan may differ for each biorepository. The DNASU Plasmid Repository at Arizona State University stores and distributes DNA plasmids to researchers worldwide, and the Biobank Core Facility at St. Joseph's Hospital and Barrow Neurological Institute consents patients and collects, stores, and distributes human tissue and blood samples. We will discuss these two biorepositories, their similar and different approaches to sustainability and business planning, their challenges in creating and implementing their sustainability plan, and their responses to some of these challenges. From these experiences, the biobanks share lessons learned about planning for sustainability that are applicable to all biorepositories. PMID:26697909

  5. International Space Station Increment Operations Services

    NASA Astrophysics Data System (ADS)

    Michaelis, Horst; Sielaff, Christian

    2002-01-01

    The Industrial Operator (IO) has defined End-to-End services to perform efficiently all required operations tasks for the Manned Space Program (MSP) as agreed during the Ministerial Council in Edinburgh in November 2001. Those services are the result of a detailed task analysis based on the operations processes as derived from the Space Station Program Implementation Plans (SPIP) and defined in the Operations Processes Documents (OPD). These services are related to ISS Increment Operations and ATV Mission Operations. Each of these End-to-End services is typically characterised by the following properties: It has a clearly defined starting point, where all requirements on the end-product are fixed and associated performance metrics of the customer are well defined. It has a clearly defined ending point, when the product or service is delivered to the customer and accepted by him, according to the performance metrics defined at the start point. The implementation of the process might be restricted by external boundary conditions and constraints mutually agreed with the customer. As far as those are respected the IO has the free choice to select methods and means of implementation. The ISS Increment Operations Service (IOS) activities required for the MSP Exploitation program cover the complete increment specific cycle starting with the support to strategic planning and ending with the post increment evaluation. These activities are divided into sub-services including the following tasks: - ISS Planning Support covering the support to strategic and tactical planning up to the generation - Development &Payload Integration Support - ISS Increment Preparation - ISS Increment Execution These processes are tight together by the Increment Integration Management, which provides the planning and scheduling of all activities as well as the technical management of the overall process . The paper describes the entire End-to-End ISS Increment Operations service and the implementation to support the Columbus Flight 1E related increment and subsequent ISS increments. Special attention is paid to the implications caused by long term operations on hardware, software and operations personnel.

  6. Quality-assurance plan for water-resources activities of the U.S. Geological Survey in Idaho

    USGS Publications Warehouse

    Packard, F.A.

    1996-01-01

    To ensure continued confidence in its products, the Water Resources Division of the U.S. Geological Survey implemented a policy that all its scientific work be performed in accordance with a centrally managed quality-assurance program. This report establishes and documents a formal policy for current (1995) quality assurance within the Idaho District of the U.S. Geological Survey. Quality assurance is formalized by describing district organization and operational responsibilities, documenting the district quality-assurance policies, and describing district functions. The districts conducts its work through offices in Boise, Idaho Falls, Twin Falls, Sandpoint, and at the Idaho National Engineering Laboratory. Data-collection programs and interpretive studies are conducted by two operating units, and operational and technical assistance is provided by three support units: (1) Administrative Services advisors provide guidance on various personnel issues and budget functions, (2) computer and reports advisors provide guidance in their fields, and (3) discipline specialists provide technical advice and assistance to the district and to chiefs of various projects. The district's quality-assurance plan is based on an overall policy that provides a framework for defining the precision and accuracy of collected data. The plan is supported by a series of quality-assurance policy statements that describe responsibilities for specific operations in the district's program. The operations are program planning; project planning; project implementation; review and remediation; data collection; equipment calibration and maintenance; data processing and storage; data analysis, synthesis, and interpretation; report preparation and processing; and training. Activities of the district are systematically conducted under a hierarchy of supervision an management that is designed to ensure conformance with Water Resources Division goals quality assurance. The district quality-assurance plan does not describe detailed technical activities that are commonly termed "quality-control procedures." Instead, it focuses on current policies, operations, and responsibilities that are implemented at the management level. Contents of the plan will be reviewed annually and updated as programs and operations change.

  7. Dengue Contingency Planning: From Research to Policy and Practice.

    PubMed

    Runge-Ranzinger, Silvia; Kroeger, Axel; Olliaro, Piero; McCall, Philip J; Sánchez Tejeda, Gustavo; Lloyd, Linda S; Hakim, Lokman; Bowman, Leigh R; Horstick, Olaf; Coelho, Giovanini

    2016-09-01

    Dengue is an increasingly incident disease across many parts of the world. In response, an evidence-based handbook to translate research into policy and practice was developed. This handbook facilitates contingency planning as well as the development and use of early warning and response systems for dengue fever epidemics, by identifying decision-making processes that contribute to the success or failure of dengue surveillance, as well as triggers that initiate effective responses to incipient outbreaks. Available evidence was evaluated using a step-wise process that included systematic literature reviews, policymaker and stakeholder interviews, a study to assess dengue contingency planning and outbreak management in 10 countries, and a retrospective logistic regression analysis to identify alarm signals for an outbreak warning system using datasets from five dengue endemic countries. Best practices for managing a dengue outbreak are provided for key elements of a dengue contingency plan including timely contingency planning, the importance of a detailed, context-specific dengue contingency plan that clearly distinguishes between routine and outbreak interventions, surveillance systems for outbreak preparedness, outbreak definitions, alert algorithms, managerial capacity, vector control capacity, and clinical management of large caseloads. Additionally, a computer-assisted early warning system, which enables countries to identify and respond to context-specific variables that predict forthcoming dengue outbreaks, has been developed. Most countries do not have comprehensive, detailed contingency plans for dengue outbreaks. Countries tend to rely on intensified vector control as their outbreak response, with minimal focus on integrated management of clinical care, epidemiological, laboratory and vector surveillance, and risk communication. The Technical Handbook for Surveillance, Dengue Outbreak Prediction/ Detection and Outbreak Response seeks to provide countries with evidence-based best practices to justify the declaration of an outbreak and the mobilization of the resources required to implement an effective dengue contingency plan.

  8. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Fraley, John J.; Marotz, Brian L.; DosSantos, Joseph M.

    In this document we present fisheries losses, mitigation alternatives, and recommendations to protect, mitigate, and enhance resident fish and aquatic habitat affected by the construction and operation of Hungry Horse Dam. This plan addresses six separate program measures in the 1987 Columbia Basin Fish and Wildlife Program. We designed the plan to be closely coordinated in terms of dam operations, funding, and activities with the Kerr Mitigation Plan presently before the Federal Energy Regulatory Commission. This document represents a mitigation plan for consideration by the Northwest Power Planning Council process; it is not an implementation plan. Flathead Lake is onemore » of the cleanest lakes of its size in the world. The exceptional water quality and unique native fisheries make the Flathead Lake/River system extremely valuable to the economy and quality of life in the basin. The recreational fishery in Flathead Lake has an estimated value of nearly eight million dollars annually. This mitigation process represents our best opportunity to reduce the impacts of hydropower in this valuable aquatic system and increase angling opportunity. We based loss estimates and mitigation alternatives on an extensive data base, agency reports, nationally and internationally peer-reviewed scientific articles, and an innovative biological model for Hungry Horse Reservoir and the Flathead River. We conducted an extensive, 14-month scoping and consultation process with agency representatives, representatives of citizen groups, and the general public. This consultation process helped identify issues, areas of agreement, areas of conflict, and advantages and disadvantages of mitigation alternatives. The results of the scoping and consultation process helped shape our mitigation plan. Our recommended plan is based firmly on principles of adaptive management and recognition of biological uncertainty. After we receive direction from the NPPC, we will add more detailed hypotheses and other features necessary for a long-term implementation plan.« less

  9. Anatomy of Biometric Passports

    PubMed Central

    Malčík, Dominik; Drahanský, Martin

    2012-01-01

    Travelling is becoming available for more and more people. Millions of people are on a way every day. That is why a better control over global human transfer and a more reliable identity check is desired. A recent trend in a field of personal identification documents is to use RFID (Radio Frequency Identification) technology and biometrics, especially (but not only) in passports. This paper provides an insight into the electronic passports (also called e-passport or ePassport) implementation chosen in the Czech Republic. Such a summary is needed for further studies of biometric passports implementation security and biometric passports analysis. A separate description of the Czech solution is a prerequisite for a planned analysis, because of the uniqueness of each implementation. (Each country can choose the implementation details within a range specified by the ICAO (International Civil Aviation Organisation); moreover, specific security mechanisms are optional and can be omitted). PMID:22969272

  10. Anatomy of biometric passports.

    PubMed

    Malčík, Dominik; Drahanský, Martin

    2012-01-01

    Travelling is becoming available for more and more people. Millions of people are on a way every day. That is why a better control over global human transfer and a more reliable identity check is desired. A recent trend in a field of personal identification documents is to use RFID (Radio Frequency Identification) technology and biometrics, especially (but not only) in passports. This paper provides an insight into the electronic passports (also called e-passport or ePassport) implementation chosen in the Czech Republic. Such a summary is needed for further studies of biometric passports implementation security and biometric passports analysis. A separate description of the Czech solution is a prerequisite for a planned analysis, because of the uniqueness of each implementation. (Each country can choose the implementation details within a range specified by the ICAO (International Civil Aviation Organisation); moreover, specific security mechanisms are optional and can be omitted).

  11. SU-G-201-01: An Automated Treatment Plan Quality Assurance Program for High-Dose Rate (HDR) Brachytherapy with a VaginalCylinder Applicator

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Zhou, Y; Tan, J; Jiang, S

    Purpose: Plan specific quality assurance (QA) is an important step in high dose rate (HDR) brachytherapy to ensure the integrity of a treatment plan. The conventional approach is to assemble a set of plan screen-captures in a document and have an independent plan-checker to verify it. Not only is this approach cumbersome and time-consuming, using a document also limits the items that can be verified, hindering plan quality and patient safety. We have initiated efforts to develop a web-based HDR brachytherapy QA system called AutoBrachy QA, for comprehensive and efficient QA. This abstract reports a new plugin in this systemmore » for the QA of a cylinder HDR brachytherapy treatment. Methods: A cylinder plan QA module was developed using Python. It was plugged into our AutoBrachy QA system. This module extracted information from CT images and treatment plan. Image processing techniques were employed to obtain geometric parameters, e.g. cylinder diameter. A comprehensive set of eight geometrical and eight dosimetric features of the plan were validated against user specified planning parameter, such as prescription value, treatment depth and length, etc. A PDF document was generated, consisting of a summary QA sheet with all the QA results, as well as images showing plan details. Results: The cylinder QA program has been implemented in our clinic. To date, it has been used in 11 patient cases and was able to successfully perform QA tests in all of them. The QA program reduced the average plan QA time from 7 min using conventional manual approach to 0.5 min. Conclusion: Being a new module in our AutoBrachy QA system, an automated treatment plan QA module for cylinder HDR brachytherapy has been successfully developed and clinically implemented. This module improved clinical workflow and plan integrity compared to the conventional manual approach.« less

  12. Status of SFR Codes and Methods QA Implementation

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Brunett, Acacia J.; Briggs, Laural L.; Fanning, Thomas H.

    2017-01-31

    This report details development of the SAS4A/SASSYS-1 SQA Program and describes the initial stages of Program implementation planning. The provisional Program structure, which is largely focused on the establishment of compliant SQA documentation, is outlined in detail, and Program compliance with the appropriate SQA requirements is highlighted. Additional program activities, such as improvements to testing methods and Program surveillance, are also described in this report. Given that the programmatic resources currently granted to development of the SAS4A/SASSYS-1 SQA Program framework are not sufficient to adequately address all SQA requirements (e.g. NQA-1, NUREG/BR-0167, etc.), this report also provides an overview ofmore » the gaps that remain the SQA program, and highlights recommendations on a path forward to resolution of these issues. One key finding of this effort is the identification of the need for an SQA program sustainable over multiple years within DOE annual R&D funding constraints.« less

  13. Design and implementation of a project-based active/cooperative engineering design course for freshmen

    NASA Astrophysics Data System (ADS)

    Abdulaal, R. M.; Al-Bahi, A. M.; Soliman, A. Y.; Iskanderani, F. I.

    2011-08-01

    A project-based active/cooperative design course is planned, implemented, assessed and evaluated to achieve several desired engineering outcomes. The course allows freshman-level students to gain professional hands-on engineering design experience through an opportunity to practise teamwork, quality principles, communication skills, life-long learning, realistic constraints and awareness of current domestic and global challenges. Throughout successive design reports and in-class assignments, the students are required by the end of the semester to communicate, clearly and concisely, the details of their design both orally and in writing through a functional artefact/prototype, a design notebook, an A0 project poster and a final oral presentation. In addition to these direct assessment tools, several indirect measures are used to ensure triangulation. Assignments are based on customer expectations using a detailed checklist. This paper shows the direct and indirect assessment tools that indicated a high level of achievement of course learning outcomes and a high level of student satisfaction.

  14. Toward the Application of the Implicit Particle Filter to Real Data in a Shallow Water Model of the Nearshore Ocean

    NASA Astrophysics Data System (ADS)

    Miller, R.

    2015-12-01

    Following the success of the implicit particle filter in twin experiments with a shallow water model of the nearshore environment, the planned next step is application to the intensive Sandy Duck data set, gathered at Duck, NC. Adaptation of the present system to the Sandy Duck data set will require construction and evaluation of error models for both the model and the data, as well as significant modification of the system to allow for the properties of the data set. Successful implementation of the particle filter promises to shed light on the details of the capabilities and limitations of shallow water models of the nearshore ocean relative to more detailed models. Since the shallow water model admits distinct dynamical regimes, reliable parameter estimation will be important. Previous work by other groups give cause for optimism. In this talk I will describe my progress toward implementation of the new system, including problems solved, pitfalls remaining and preliminary results

  15. Practitioner approaches to the integration of clinical decision support system technology in critical care.

    PubMed

    Weber, Scott; Crago, Elizabeth A; Sherwood, Paula R; Smith, Tara

    2009-11-01

    The aim of this study was to explore the experiences of nurses and physicians who use a clinical decision support system (CDSS) in the critical care area, focusing on clinicians' motives and values related to decisions to either use or not use this optional technology. Information technology (IT) has been demonstrated to positively impact quality of patient care. Decision-support technology serves as an adjunct to, not as a replacement for, actual clinical decision making. Nurse administrators play an imperative role in the planning and implementation of IT projects and can benefit from understanding clinicians' affective considerations and approaches to the technology. This qualitative study used grounded theory methods. A total of 33 clinicians participated in in-depth structured interviews probing their professional concerns with how the technology is used. Data were analyzed using the constant comparative method. Medical staff were frustrated by perceived lack of planning input before system implementation. Both nurse and physician cohort groups were dissatisfied with preimplementation education. Barriers to system use were identified in significant detail by the participants. Both nurses and physicians should be involved in preimplementation planning and ongoing evaluation of CDSSs. There is a need for a systematic review or Cochrane meta-analysis describing the affective aspects of successful implementations of decisional technology in critical care, specifically from the perspective of nursing administrators.

  16. The Dutch 'Focus on Strength' intervention study protocol: programme design and production, implementation and evaluation plan.

    PubMed

    Ten Hoor, G A; Kok, G; Rutten, G M; Ruiter, R A C; Kremers, S P J; Schols, A M J W; Plasqui, G

    2016-06-10

    Overweight youngsters are better in absolute strength exercises than their normal-weight counterparts; a physiological phenomenon with promising psychological impact. In this paper we describe the study protocol of the Dutch, school-based program 'Focus on Strength' that aims to improve body composition of 11-13 year old students, and with that to ultimately improve their quality of life. The development of this intervention is based on the Intervention Mapping (IM) protocol, which starts from a needs assessment, uses theory and empirical research to develop a detailed intervention plan, and anticipates program implementation and evaluation. This novel intervention targets first year students in preparatory secondary vocational education (11-13 years of age). Teachers are the program implementers. One part of the intervention involves a 30 % increase of strength exercises in the physical education lessons. The other part is based on Motivational Interviewing, promoting autonomous motivation of students to become more physically active outside school. Performance and change objectives are described for both teachers and students. The effectiveness of the intervention will be tested in a Randomized Controlled Trial in 9 Dutch high schools. Intervention Mapping is a useful framework for program planning a school-based program to improve body composition and motivation to exercise in 11-13 year old adolescents by a "Focus on Strength". NTR5676 , registered 8 February 2016 (retrospectively registered).

  17. 50 CFR 600.1008 - Implementation plan and implementation regulations.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 50 Wildlife and Fisheries 8 2010-10-01 2010-10-01 false Implementation plan and implementation... Capacity Reduction Framework § 600.1008 Implementation plan and implementation regulations. (a) As soon as... period, a proposed implementation plan and implementation regulations. During the public comment period...

  18. Library Space: Assessment and Planning through a Space Utilization Study.

    PubMed

    Prentice, Katherine A; Argyropoulos, Erica K

    2018-01-01

    The objective of this article is to describe the recent space and furniture utilization study conducted through direct observation at the small, academic-centered Schusterman Library. Student workers from the library's reference desk monitored two semesters of use and went on to observe a third semester after electrical power upgrades were installed. Extensive use details were collected about where library patrons sat during which parts of the day, and certain areas of the library were ultimately identified as much more active than others. Overall, the information gathered proved useful to library planning and will be valuable to future space initiatives. This article further demonstrates feasible means for any library to implement a similar study with minimal resources.

  19. Accreditation of Individualized Quality Control Plans by the College of American Pathologists.

    PubMed

    Hoeltge, Gerald A

    2017-03-01

    The Laboratory Accreditation Program of the College of American Pathologists (CAP) began in 2015 to allow accredited laboratories to devise their own strategies for quality control of laboratory testing. Participants now have the option to implement individualized quality control plans (IQCPs). Only nonwaived testing that features an internal control (built-in, electronic, or procedural) is eligible for IQCP accreditation. The accreditation checklists that detail the requirements have been peer-reviewed by content experts on CAP's scientific resource committees and by a panel of accreditation participants. Training and communication have been key to the successful introduction of the new IQCP requirements. Copyright © 2016 Elsevier Inc. All rights reserved.

  20. Production of the next-generation library virtual tour.

    PubMed

    Duncan, J M; Roth, L K

    2001-10-01

    While many libraries offer overviews of their services through their Websites, only a small number of health sciences libraries provide Web-based virtual tours. These tours typically feature photographs of major service areas along with textual descriptions. This article describes the process for planning, producing, and implementing a next-generation virtual tour in which a variety of media elements are integrated: photographic images, 360-degree "virtual reality" views, textual descriptions, and contextual floor plans. Hardware and software tools used in the project are detailed, along with a production timeline and budget, tips for streamlining the process, and techniques for improving production. This paper is intended as a starting guide for other libraries considering an investment in such a project.

  1. Halogen occultation experiment intergrated test plan

    NASA Technical Reports Server (NTRS)

    Mauldin, L. E., III; Butterfield, A. J.

    1986-01-01

    The test program plan is presented for the Halogen Occultation Experiment (HALOE) instrument, which is being developed in-house at the Langley Research Center for the Upper Atmosphere Research Satellite (UARS). This comprehensive test program was developed to demonstrate that the HALOE instrument meets its performance requirements and maintains integrity through UARS flight environments. Each component, subsystem, and system level test is described in sufficient detail to allow development of the necessary test setups and test procedures. Additionally, the management system for implementing this test program is given. The HALOE instrument is a gas correlation radiometer that measures vertical distribution of eight upper atmospheric constituents: O3, HC1, HF, NO, CH4, H2O, NO2, and CO2.

  2. Failure mode analysis to predict product reliability.

    NASA Technical Reports Server (NTRS)

    Zemanick, P. P.

    1972-01-01

    The failure mode analysis (FMA) is described as a design tool to predict and improve product reliability. The objectives of the failure mode analysis are presented as they influence component design, configuration selection, the product test program, the quality assurance plan, and engineering analysis priorities. The detailed mechanics of performing a failure mode analysis are discussed, including one suggested format. Some practical difficulties of implementation are indicated, drawn from experience with preparing FMAs on the nuclear rocket engine program.

  3. What Would Your Journal Say if It Could Talk Back? Using Dialogue Journals as a Technique in Adolescent HIV/STI Prevention and Sexual Health Promotion Programs

    ERIC Educational Resources Information Center

    Sclafane, Jamie Heather

    2013-01-01

    Dialogue journaling is a technique that is useful for enhancing the goals of sexual health promotion and HIV/STI prevention programs with 14-to 17-year-old at-risk youth. Included is a detailed lesson plan on how to implement dialogue journaling in this context, a discussion of advantages and concerns about using them, and future implications for…

  4. Developing, implementing, and evaluating a handbook for parents of pediatric hematology/oncology patients.

    PubMed

    Heiney, S P; Wells, L M

    1995-07-01

    This article details the development of a parent handbook for pediatric hematology and oncology patients. The planning and content development are discussed. Adult learning principles were incorporated throughout the handbook. Use of the handbook in a pediatric cancer center is described. Both subjective and objective methods were used to evaluate the handbook. Results from the evaluation verify the value of the handbook to parents and give direction for future revisions of the handbook.

  5. Field support activity aerospace manpower transfer to small business enterprises

    NASA Technical Reports Server (NTRS)

    Green, M. K.

    1972-01-01

    This report reiterates the major findings of the original study on the utilization of unemployed aerospace professionals in small businesses, and also provides a definition of three programs which, as a result of this study and other research into this problem, offer great potential in providing for better utilization of the nation's technically trained personal and technology resources. Details of these three programs are provided along with a recommended plan of action for their implementation.

  6. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kurnik, Charles W.; Boyd, Brian; Stoughton, Kate M.

    This measurement and verification (M and V) protocol provides procedures for energy service companies (ESCOs) and water efficiency service companies (WESCOs) to determine water savings resulting from water conservation measures (WCMs) in energy performance contracts associated with cooling tower efficiency projects. The water savings are determined by comparing the baseline water use to the water use after the WCM has been implemented. This protocol outlines the basic structure of the M and V plan, and details the procedures to use to determine water savings.

  7. GPU-accelerated Monte Carlo convolution/superposition implementation for dose calculation.

    PubMed

    Zhou, Bo; Yu, Cedric X; Chen, Danny Z; Hu, X Sharon

    2010-11-01

    Dose calculation is a key component in radiation treatment planning systems. Its performance and accuracy are crucial to the quality of treatment plans as emerging advanced radiation therapy technologies are exerting ever tighter constraints on dose calculation. A common practice is to choose either a deterministic method such as the convolution/superposition (CS) method for speed or a Monte Carlo (MC) method for accuracy. The goal of this work is to boost the performance of a hybrid Monte Carlo convolution/superposition (MCCS) method by devising a graphics processing unit (GPU) implementation so as to make the method practical for day-to-day usage. Although the MCCS algorithm combines the merits of MC fluence generation and CS fluence transport, it is still not fast enough to be used as a day-to-day planning tool. To alleviate the speed issue of MC algorithms, the authors adopted MCCS as their target method and implemented a GPU-based version. In order to fully utilize the GPU computing power, the MCCS algorithm is modified to match the GPU hardware architecture. The performance of the authors' GPU-based implementation on an Nvidia GTX260 card is compared to a multithreaded software implementation on a quad-core system. A speedup in the range of 6.7-11.4x is observed for the clinical cases used. The less than 2% statistical fluctuation also indicates that the accuracy of the authors' GPU-based implementation is in good agreement with the results from the quad-core CPU implementation. This work shows that GPU is a feasible and cost-efficient solution compared to other alternatives such as using cluster machines or field-programmable gate arrays for satisfying the increasing demands on computation speed and accuracy of dose calculation. But there are also inherent limitations of using GPU for accelerating MC-type applications, which are also analyzed in detail in this article.

  8. Identifying gaps, barriers, and solutions in implementing pressure ulcer prevention programs.

    PubMed

    Jankowski, Irene M; Nadzam, Deborah Morris

    2011-06-01

    Patients continue to suffer from pressure ulcers (PUs), despite implementation of evidence-based pressure ulcer (PU) prevention protocols. In 2009, Joint Commission Resources (JCR) and Hill-Rom created the Nurse Safety Scholar-in-Residence (nurse scholar) program to foster the professional development of expert nurse clinicians to become translators of evidence into practice. The first nurse scholar activity has focused on PU prevention. Four hospitals with established PU programs participated in the PU prevention implementation project. Each hospital's team completed an inventory of PU prevention program components and provided copies of accompanying documentation, along with prevalence and incidence data. Site visits to the four participating hospitals were arranged to provide opportunities for more in-depth analysis and support. Following the initial site visit, the project team at each hospital developed action plans for the top three barriers to PU program implementation. A series of conference calls was held between the site visits. Pressure Ulcer Program Gaps and Recommendations. The four hospitals shared common gaps in terms of limitations in staff education and training; lack of physician involvement; limited involvement of unlicensed nursing staff; lack of plan for communicating at-risk status; and limited quality improvement evaluations of bedside practices. Detailed recommendations were identified for addressing each of these gaps. these Recommendations for eliminating gaps have been implemented by the participating teams to drive improvement and to reduce hospital-acquired PU rates. The nurse scholars will continue to study implementation of best practices for PU prevention.

  9. Control of Technology Transfer at JPL

    NASA Technical Reports Server (NTRS)

    Oliver, Ronald

    2006-01-01

    Controlled Technology: 1) Design: preliminary or critical design data, schematics, technical flow charts, SNV code/diagnostics, logic flow diagrams, wirelist, ICDs, detailed specifications or requirements. 2) Development: constraints, computations, configurations, technical analyses, acceptance criteria, anomaly resolution, detailed test plans, detailed technical proposals. 3) Production: process or how-to: assemble, operated, repair, maintain, modify. 4) Manufacturing: technical instructions, specific parts, specific materials, specific qualities, specific processes, specific flow. 5) Operations: how-to operate, contingency or standard operating plans, Ops handbooks. 6) Repair: repair instructions, troubleshooting schemes, detailed schematics. 7) Test: specific procedures, data, analysis, detailed test plan and retest plans, detailed anomaly resolutions, detailed failure causes and corrective actions, troubleshooting, trended test data, flight readiness data. 8) Maintenance: maintenance schedules and plans, methods for regular upkeep, overhaul instructions. 9) Modification: modification instructions, upgrades kit parts, including software

  10. Columbia River System Operation Review : Final Environmental Impact Statement, Appendix D: Cultural Resources.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Columbia River System Operation Review

    1995-11-01

    This study attempts to identify and analyze the impacts of the System Operating Strategy (SOS) alternatives on cultural resources. The impacts include effects on Native American traditional cultural values, properties and practices. They also include effects on archeological or historic properties meeting the criteria of the National Register of Historic Places. In addition to responding to the requirements of the National Environmental Policy Act (NEPA), this analysis addresses the requirements of the National Historic Preservation Act (NHPA), the Archeological Resources Protection Act (ARPA), the Native American Graves Protection and Repatriation Act (NAGPRA), the Native American Religious Freedom Act (NARFA), andmore » other relevant legislation. To meet their legally mandated cultural resources requirements, the SOR agencies will develop agreements and Implementation Plans with the appropriate State Historic Preservation Officers (SHPOs), Tribes, and the Advisory Council on Historic Preservation (ACHP) detailing the measures necessary to best manage the resource. The planning and implementation activities will be staged over a number of years in consultation with affected Tribes.« less

  11. CALINX (California Information Exchange): a multi-stakeholder statewide initiative to improve healthcare information flows.

    PubMed

    Hopkins, D S; Oswald, N; McCaffrey, K; Bressler, S; Davidson, N; Vela, L

    2000-01-01

    Given the diffusion of responsibilities for gathering and reporting healthcare information in a managed care environment, California stakeholders are taking concrete steps to break the deadlock on data and information flows that has characterized the industry for some time. The California Information Exchange (CALINX) was established to facilitate the implementation of the Health Insurance Portability and Accountability Act (HIPAA) standards in California and to create trust for data exchange between trading partners, without which data exchange still will not occur. Strategic directions are set by the chief executives of key associations and organizations representing purchasers, plans, providers, and consumers. Multi-stakeholder workgroups have produced detailed data guidelines for the HIPAA standards along with rules for exchange of key data sets between trading partners. These rules address frequency, timeliness, and accuracy of data submission. Both the data guidelines and the rules have been tested in live demonstration projects, and the results of these projects have been reported to substantiate the business case for implementation. Further incentives are being built into contracts between purchasers and plans, and between plans and providers. CALINX is currently promoting widespread adoption of the data guidelines and rules for exchange with all members of the industry.

  12. Implementation of the Recommendations of the Presidential Commission on the Space Shuttle Challenger Accident

    NASA Technical Reports Server (NTRS)

    1987-01-01

    This final status report describes the actions taken by NASA in response to the recommendations of the Presidential Commission on the Space Shuttle Challenger Accident (Mission 51-L). The Commission recommendations and NASA's responses to them are summarized in the Executive Summary, which is accompanied by a schedule showing significant program milestones. A detailed discussion of the activities undertaken by NASA to implement each of the nine Commission recommendations is included and other related NASA actions required for safe return to flight are discussed. A copy of the interim plan submitted to the President one year ago and other significant reference documents are included as appendixes.

  13. The Australian response: pandemic influenza preparedness.

    PubMed

    Horvath, John S; McKinnon, Moira; Roberts, Leslee

    2006-11-20

    Australia's preparedness for a potential influenza pandemic involves many players, from individual health carers to interdepartmental government committees. It embraces a wide number of strategies from the management of the disease to facilitating business continuity. The key strategy underlying Australia's planned response is an intensive effort to reduce transmission of the virus. This includes actions to reduce the likelihood of entry of the virus into the country and to contain outbreaks when they occur. Containment will provide time to allow production of a matched vaccine. The health strategies are outlined in the Australian health management plan for pandemic influenza. The plan is accompanied by technical annexes setting out key considerations and guidelines in the areas of clinical management and infection control. National plans present overall strategies and guidance, but the operational details can only be determined by individual states and territories, regions, and the services themselves. Primary health care practices will be on the frontline of an influenza pandemic. Every practice needs a plan that defines the roles of staff, incorporates infection control and staff protection measures, and considers business continuity. Most importantly, a practice needs to know how to implement that plan.

  14. Development of preoperative planning software for transforaminal endoscopic surgery and the guidance for clinical applications.

    PubMed

    Chen, Xiaojun; Cheng, Jun; Gu, Xin; Sun, Yi; Politis, Constantinus

    2016-04-01

    Preoperative planning is of great importance for transforaminal endoscopic techniques applied in percutaneous endoscopic lumbar discectomy. In this study, a modular preoperative planning software for transforaminal endoscopic surgery was developed and demonstrated. The path searching method is based on collision detection, and the oriented bounding box was constructed for the anatomical models. Then, image reformatting algorithms were developed for multiplanar reconstruction which provides detailed anatomical information surrounding the virtual planned path. Finally, multithread technique was implemented to realize the steady-state condition of the software. A preoperative planning software for transforaminal endoscopic surgery (TE-Guider) was developed; seven cases of patients with symptomatic lumbar disc herniations were planned preoperatively using TE-Guider. The distances to the midlines and the direction of the optimal paths were exported, and each result was in line with the empirical value. TE-Guider provides an efficient and cost-effective way to search the ideal path and entry point for the puncture. However, more clinical cases will be conducted to demonstrate its feasibility and reliability.

  15. An introduction to indigenous health and culture: the first tier of the Three Tiered Plan.

    PubMed

    Sinnott, M J; Wittmann, B

    2001-06-01

    The objective of the present study was to prepare new doctors with an awareness of cultural and health issues to facilitate positive experiences with indigenous patients. The study incorporated the 1998 intern orientation programs in Queensland public hospitals. The study method included tier one of the Three Tiered Plan, which was implemented and audited. Indigenous liaison officers, directors of clinical training and medical education officers were surveyed prior to this implementation to determine whether any or similar initiatives had been carried out in previous years and/or were planned. Post-implementation feedback from interns was obtained by using questionnaires. Follow-up telephone interviews with the directors of clinical training, medical education officers and indigenous hospital liaison officers detailed the format and content of tier one at each hospital. The results indicate that this active intervention improved the implementation rate of tier one from nine of 19 (47%) Queensland public hospitals in 1997 to 17 (90%) in 1998. The 14 indigenous hospital liaison officers (100%) involved in the intervention perceived it as beneficial. Forty-three (67%) of interns who responded to the survey indicated they had encountered an indigenous patient within the last 2-4 months. The level of knowledge of indigenous health and culture self-reported by interns was between the categories 'enough to get by' and 'inadequate'. In conclusion, it appears that tier one has been successful and is to be a formal component of intern orientations in Queensland public hospitals. Further initiatives in indigenous health and culture targeting medical staff (i.e. tier two and tier three), are needed.

  16. What Data to Use for Forest Conservation Planning? A Comparison of Coarse Open and Detailed Proprietary Forest Inventory Data in Finland

    PubMed Central

    Lehtomäki, Joona; Tuominen, Sakari; Toivonen, Tuuli; Leinonen, Antti

    2015-01-01

    The boreal region is facing intensifying resource extraction pressure, but the lack of comprehensive biodiversity data makes operative forest conservation planning difficult. Many countries have implemented forest inventory schemes and are making extensive and up-to-date forest databases increasingly available. Some of the more detailed inventory databases, however, remain proprietary and unavailable for conservation planning. Here, we investigate how well different open and proprietary forest inventory data sets suit the purpose of conservation prioritization in Finland. We also explore how much priorities are affected by using the less accurate but open data. First, we construct a set of indices for forest conservation value based on quantitative information commonly found in forest inventories. These include the maturity of the trees, tree species composition, and site fertility. Secondly, using these data and accounting for connectivity between forest types, we investigate the patterns in conservation priority. For prioritization, we use Zonation, a method and software for spatial conservation prioritization. We then validate the prioritizations by comparing them to known areas of high conservation value. We show that the overall priority patterns are relatively consistent across different data sources and analysis options. However, the coarse data cannot be used to accurately identify the high-priority areas as it misses much of the fine-scale variation in forest structures. We conclude that, while inventory data collected for forestry purposes may be useful for forest conservation purposes, it needs to be detailed enough to be able to account for more fine-scaled features of high conservation value. These results underline the importance of making detailed inventory data publicly available. Finally, we discuss how the prioritization methodology we used could be integrated into operative forest management, especially in countries in the boreal zone. PMID:26317227

  17. What Data to Use for Forest Conservation Planning? A Comparison of Coarse Open and Detailed Proprietary Forest Inventory Data in Finland.

    PubMed

    Lehtomäki, Joona; Tuominen, Sakari; Toivonen, Tuuli; Leinonen, Antti

    2015-01-01

    The boreal region is facing intensifying resource extraction pressure, but the lack of comprehensive biodiversity data makes operative forest conservation planning difficult. Many countries have implemented forest inventory schemes and are making extensive and up-to-date forest databases increasingly available. Some of the more detailed inventory databases, however, remain proprietary and unavailable for conservation planning. Here, we investigate how well different open and proprietary forest inventory data sets suit the purpose of conservation prioritization in Finland. We also explore how much priorities are affected by using the less accurate but open data. First, we construct a set of indices for forest conservation value based on quantitative information commonly found in forest inventories. These include the maturity of the trees, tree species composition, and site fertility. Secondly, using these data and accounting for connectivity between forest types, we investigate the patterns in conservation priority. For prioritization, we use Zonation, a method and software for spatial conservation prioritization. We then validate the prioritizations by comparing them to known areas of high conservation value. We show that the overall priority patterns are relatively consistent across different data sources and analysis options. However, the coarse data cannot be used to accurately identify the high-priority areas as it misses much of the fine-scale variation in forest structures. We conclude that, while inventory data collected for forestry purposes may be useful for forest conservation purposes, it needs to be detailed enough to be able to account for more fine-scaled features of high conservation value. These results underline the importance of making detailed inventory data publicly available. Finally, we discuss how the prioritization methodology we used could be integrated into operative forest management, especially in countries in the boreal zone.

  18. Corrective Action Decision Document/Corrective Action Plan for the 92-Acre Area and Corrective Action Unit 111: Area 5 WMD Retired Mixed Waste Pits, Nevada National Security Site, Nevada

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NSTec Environmental Restoration

    This Corrective Action Decision Document/Corrective Action Plan (CADD/CAP) has been prepared for the 92-Acre Area, the southeast quadrant of the Radioactive Waste Management Site, located in Area 5 of the Nevada National Security Site (NNSS). The 92-Acre Area includes Corrective Action Unit (CAU) 111, 'Area 5 WMD Retired Mixed Waste Pits.' Data Quality Objectives (DQOs) were developed for the 92-Acre Area, which includes CAU 111. The result of the DQO process was that the 92-Acre Area is sufficiently characterized to provide the input data necessary to evaluate corrective action alternatives (CAAs) without the collection of additional data. The DQOs aremore » included as Appendix A of this document. This CADD/CAP identifies and provides the rationale for the recommended CAA for the 92-Acre Area, provides the plan for implementing the CAA, and details the post-closure plan. When approved, this CADD/CAP will supersede the existing Pit 3 (P03) Closure Plan, which was developed in accordance with Title 40 Code of Federal Regulations (CFR) Part 265, 'Interim Status Standards for Owners and Operators of Hazardous Waste Treatment, Storage, and Disposal Facilities.' This document will also serve as the Closure Plan and the Post-Closure Plan, which are required by 40 CFR 265, for the 92-Acre Area. After closure activities are complete, a request for the modification of the Resource Conservation and Recovery Act Permit that governs waste management activities at the NNSS will be submitted to the Nevada Division of Environmental Protection to incorporate the requirements for post-closure monitoring. Four CAAs, ranging from No Further Action to Clean Closure, were evaluated for the 92-Acre Area. The CAAs were evaluated on technical merit focusing on performance, reliability, feasibility, safety, and cost. Based on the evaluation of the data used to develop the conceptual site model; a review of past, current, and future operations at the site; and the detailed and comparative analysis of the potential CAAs, Closure in Place with Administrative Controls is the preferred CAA for the 92-Acre Area. Closure activities will include the following: (1) Constructing an engineered evapotranspiration cover over the 92-Acre Area; (2) Installing use restriction (UR) warning signs, concrete monuments, and subsidence survey monuments; (3) Establishing vegetation on the cover; (4) Implementing a UR; and (5) Implementing post-closure inspections and monitoring. The Closure in Place with Administrative Controls alternative meets all requirements for the technical components evaluated, fulfills all applicable federal and state regulations for closure of the site, and will minimize potential future exposure pathways to the buried waste at the site.« less

  19. Corrective Action Decision Document/Corrective Action Plan for the 92-Acre Area and Corrective Action Unit 111: Area 5 WMD Retired Mixed Waste Pits, Nevada Test Site, Nevada

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NSTec Environmental Restoration

    2009-07-31

    This Corrective Action Decision Document/Corrective Action Plan (CADD/CAP) has been prepared for the 92-Acre Area, the southeast quadrant of the Radioactive Waste Management Site, located in Area 5 of the Nevada Test Site (NTS). The 92-Acre Area includes Corrective Action Unit (CAU) 111, 'Area 5 WMD Retired Mixed Waste Pits.' Data Quality Objectives (DQOs) were developed for the 92-Acre Area, which includes CAU 111. The result of the DQO process was that the 92-Acre Area is sufficiently characterized to provide the input data necessary to evaluate corrective action alternatives (CAAs) without the collection of additional data. The DQOs are includedmore » as Appendix A of this document. This CADD/CAP identifies and provides the rationale for the recommended CAA for the 92-Acre Area, provides the plan for implementing the CAA, and details the post-closure plan. When approved, this CADD/CAP will supersede the existing Pit 3 (P03) Closure Plan, which was developed in accordance with Title 40 Code of Federal Regulations (CFR) Part 265, 'Interim Status Standards for Owners and Operators of Hazardous Waste Treatment, Storage, and Disposal Facilities.' This document will also serve as the Closure Plan and the Post-Closure Plan, which are required by 40 CFR 265, for the 92-Acre Area. After closure activities are complete, a request for the modification of the Resource Conservation and Recovery Act Permit that governs waste management activities at the NTS will be submitted to the Nevada Division of Environmental Protection to incorporate the requirements for post-closure monitoring. Four CAAs, ranging from No Further Action to Clean Closure, were evaluated for the 92-Acre Area. The CAAs were evaluated on technical merit focusing on performance, reliability, feasibility, safety, and cost. Based on the evaluation of the data used to develop the conceptual site model; a review of past, current, and future operations at the site; and the detailed and comparative analysis of the potential CAAs, Closure in Place with Administrative Controls is the preferred CAA for the 92-Acre Area. Closure activities will include the following: (1) Constructing an engineered evapotranspiration cover over the 92-Acre Area; (2) Installing use restriction (UR) warning signs, concrete monuments, and subsidence survey monuments; (3) Establishing vegetation on the cover; (4) Implementing a UR; and (5) Implementing post-closure inspections and monitoring. The Closure in Place with Administrative Controls alternative meets all requirements for the technical components evaluated, fulfills all applicable federal and state regulations for closure of the site, and will minimize potential future exposure pathways to the buried waste at the site.« less

  20. Pre-defined and optional staging for the deployment of enterprise systems: a case study and a framework

    NASA Astrophysics Data System (ADS)

    Lichtenstein, Yossi; Cucuy, Shy; Fink, Lior

    2017-03-01

    The effective deployment of enterprise systems has been a major challenge for many organisations. Customising the new system, changing business processes, and integrating multiple information sources are all difficult tasks. As such, they are typically done in carefully planned stages in a process known as phased implementation. Using ideas from Option Theory, this article critiques aspects of phased implementation. One customer relationship management (CRM) project and its phased implementation are described in detail and ten other enterprise system deployments are summarised as a basis for the observation that almost all deployment stages are pre-defined operational steps rather than decision points. However, Option Theory suggests that optional stages, to be used only when risk materialises, should be integral parts of project plans. Although such optional stages are often more valuable than pre-defined stages, the evidence presented in this article shows that they are only rarely utilised. Therefore, a simple framework is presented; it first identifies risks related to the deployment of enterprise systems, then identifies optional stages that can mitigate these risks, and finally compares the costs and benefits of both pre-defined and optional stages.

  1. The National Aerospace Initiative (NAI): Technologies For Responsive Space Access

    NASA Technical Reports Server (NTRS)

    Culbertson, Andrew; Bhat, Biliyar N.

    2003-01-01

    The Secretary of Defense has set new goals for the Department of Defense (DOD) to transform our nation's military forces. The Director for Defense Research and Engineering (DDR&E) has responded to this challenge by defining and sponsoring a transformational initiative in Science and Technology (S&T) - the National Aerospace Initiative (NAI) - which will have a fundamental impact on our nation's military capabilities and on the aerospace industry in general. The NAI is planned as a joint effort among the tri-services, DOD agencies and National Aeronautics and Space Administration (NASA). It is comprised of three major focus areas or pillars: 1) High Speed Hypersonics (HSH), 2) Space Access (SA), and 3) Space Technology (ST). This paper addresses the Space Access pillar. The NAI-SA team has employed a unique approach to identifying critical technologies and demonstrations for satisfying both military and civilian space access capabilities needed in the future. For planning and implementation purposes the NAI-SA is divided into five technology subsystem areas: Airframe, Propulsion, Flight Subsystems, Operations and Payloads. Detailed technology roadmaps were developed under each subsystem area using a time-phased, goal oriented approach that provides critical space access capabilities in a timely manner and involves subsystem ground and flight demonstrations. This S&T plan addresses near-term (2009), mid-term (2016), and long-term (2025) goals and objectives for space access. In addition, system engineering and integration approach was used to make sure that the plan addresses the requirements of the end users. This paper describes in some detail the technologies in NAI-Space Access pillar. Some areas of emphasis are: high temperature materials, thermal protection systems, long life, lightweight, highly efficient airframes, metallic and composite cryotanks, advanced liquid rocket engines, integrated vehicle health monitoring and management, highly operable systems and payloads. Implementation strategies for NAI are also described.

  2. 77 FR 43205 - Notice of Data Availability for Approval, Disapproval and Promulgation of Implementation Plans...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-24

    ... Haze State Implementation Plan; Federal Implementation Plan for Regional Haze AGENCY: Environmental... (SIP) revision submitted by the State of Wyoming on January 12, 2011, that addresses regional haze...; Regional Haze State Implementation Plan; Federal Implementation Plan for Regional Haze; Proposed Rule (77...

  3. 78 FR 28775 - Approval and Promulgation of Implementation Plans; North Carolina; State Implementation Plan...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-16

    ... Promulgation of Implementation Plans; North Carolina; State Implementation Plan Miscellaneous Revisions AGENCY... a revision to the North Carolina State Implementation Plan submitted on February 3, 2010, through... particulate matter found in the Code of Federal Regulations. In the Final Rules Section of this Federal...

  4. SouthWest Elevation, Plan Showing Deck Framing, Deck Plan, Plan of ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    South-West Elevation, Plan Showing Deck Framing, Deck Plan, Plan of Collar Beams, Etc., Typical Framing Details, End Elevations, Elevation of Scarf Top Chord, Joint Details - Perrine's Bridge, Spanning Wallkill River, Rifton, Ulster County, NY

  5. 40 CFR 35.917-4 - Planning scope and detail.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Planning scope and detail. 35.917-4... Planning scope and detail. (a) Initially, the geographic scope of step 1 grant assistance shall be based on... Regional Administrator may make the preliminary delineation of the boundaries of the planning area, if the...

  6. Framework for city planning including nature-based solutions (NBS)

    NASA Astrophysics Data System (ADS)

    Alkan Olsson, Johanna; Sörensen, Johanna; Persson, Anna

    2017-04-01

    A common strategy to lower the demand for intense land use and energy consumption is the densification of urban areas. While this might be a fruitful strategy for its main objectives, one concern is that space for green areas and surface water will be decreased. Therefore, densification increases the need of strategies to develop and increase the quality of nature-based solutions (NBS) in urban areas. Smarter city planning strategies are needed, both for maintenance of existing NBS and for implementation of NBS in new developments. City planning must be based on well-evaluated solutions, which in turn must be based on a decent data material for each city. Today there is however several type of difficulties related to adequate provision of data to ensure a better implementation of NBS. The challenges arise from issues such as lack of information about for example costs of maintenance of existing NBS, citizens' perceptions and preferred use of NBS to difficulties of a more technical character such as the format of available GIS information. This study focuses on this information gap regarding NBS that persists in most cities today. The project aims to develop a framework that can help city planners to overcome the gaps and facilitate the inclusion of high quality nature-based solutions where developed or maintained. The framework, which is detailed by identifying information gaps through a literature review and selected interviews with urban planners and experts in the area of NBS, is based on the idea that well-structured and user-friendly data supporting city-planning strategies are essential to facilitate the implementation of NBS. What can be understood as well structured and user-friendly data depends on the goals and needs expressed in the strategic plans, which mean that there is a need for a close interaction between the development data and the strategic political goals expressed in the plans.

  7. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kurnik, Charles W.; Stoughton, Kate M.; Figueroa, Jorge

    This measurement and verification (M and V) protocol provides procedures for energy service companies (ESCOs) and water efficiency service companies (WESCOs) to determine water savings as a result of water conservation measures (WCMs) in energy performance contracts associated with converting turfgrass or other water-intensive plantings to water-wise and sustainable landscapes. The water savings are determined by comparing the baseline water use to the water use after the WCM has been implemented. This protocol outlines the basic structure of the M and V plan, and details the procedures to use to determine water savings.

  8. Fire Prevention, Detection and Suppression

    NASA Technical Reports Server (NTRS)

    Ruff, Gary A.

    2004-01-01

    In mid-1999, the Space and Life Sciences Directorate at Johnson Space Center was challenged to develop a new paradigm for NASA human life sciences: space medicine, space biomedical research and countermeasures, advanced human support technology. A new thrust - Bioastronautics - was formulated with a budget augmentation request. The objective are: expanded extramural community participation through the National Space Biomedical Research Institute, initiated the detailed planning and implementation of Bioastronautics, an integrated approach to ensure healthy and safe human space travel, assist in the solution of earth-based problems.

  9. Cooling Tower (Evaporative Cooling System) Measurement and Verification Protocol

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kurnik, Charles W.; Boyd, Brian; Stoughton, Kate M.

    This measurement and verification (M and V) protocol provides procedures for energy service companies (ESCOs) and water efficiency service companies (WESCOs) to determine water savings resulting from water conservation measures (WCMs) in energy performance contracts associated with cooling tower efficiency projects. The water savings are determined by comparing the baseline water use to the water use after the WCM has been implemented. This protocol outlines the basic structure of the M and V plan, and details the procedures to use to determine water savings.

  10. Outdoor Irrigation Measurement and Verification Protocol

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kurnik, Charles W.; Stoughton, Kate M.; Figueroa, Jorge

    This measurement and verification (M&V) protocol provides procedures for energy service companies (ESCOs) and water efficiency service companies (WESCOs) to determine water savings resulting from water conservation measures (WCMs) in energy performance contracts associated with outdoor irrigation efficiency projects. The water savings are determined by comparing the baseline water use to the water use after the WCM has been implemented. This protocol outlines the basic structure of the M&V plan, and details the procedures to use to determine water savings.

  11. Tunisia Renewable Energy Project systems description report

    NASA Technical Reports Server (NTRS)

    Scudder, L. R.; Martz, J. E.; Ratajczak, A. F.

    1986-01-01

    In 1979, the Agency for International Development (AID) initiated a renewable energy project with the Government of Tunisia to develop an institutional capability to plan and institute renewable energy technologies in a rural area. The specific objective of the district energy applications subproject was to demonstrate solar and wind energy systems in a rural village setting. The NASA Lewis Research Center was asked by the AID Near East Bureau to manage and implement this subproject. This report describes the project and gives detailed desciptions of the various systems.

  12. The planned Alaska SAR Facility - An overview

    NASA Technical Reports Server (NTRS)

    Carsey, Frank; Weeks, Wilford

    1987-01-01

    The Alaska SAR Facility (ASF) is described in an overview fashion. The facility consists of three major components, a Receiving Ground System, a SAR Processing System and an Analysis and Archiving System; the ASF Program also has a Science Working Team and the requisite management and operations systems. The ASF is now an approved and fully funded activity; detailed requirements and science background are presented for the facility to be implemented for data from the European ERS-1, the Japanese ERS-1 and Radarsat.

  13. Research in advanced formal theorem-proving techniques

    NASA Technical Reports Server (NTRS)

    Rulifson, J. F.

    1971-01-01

    The present status is summarized of a continuing research program aimed at the design and implementation of a language for expressing problem-solving procedures in several areas of artificial intelligence, including program synthesis, robot planning, and theorem proving. Notations, concepts, and procedures common to the representation and solution of many of these problems were abstracted and incorporated as features into the language. The areas of research covered are described, and abstracts of six papers that contain extensive description and technical detail of the work are presented.

  14. Verification, Validation, and Accreditation (VV&A) of Federations (Verification, validation et accreditation (VV&A) des federations)

    DTIC Science & Technology

    2008-04-01

    le manque de modèle universel pour la Vérification, la Validation et l’Accréditation des fédérations à cause des perspectives et besoins nationaux...federation application will depend on a number of factors, including the quality of the requirements information and the resources allocated to the VV&A...required) allocating the required functionality to federates, and developing a detailed plan for federation development and implementation. Step 4

  15. Approved Air Quality Implementation Plans in Region 10

    EPA Pesticide Factsheets

    Landing page for information about EPA-approved air quality State Implementation Plans (SIPs), Tribal Implementation Plans (TIPs), and Federal Implementation Plans (FIPs) in Alaska, Idaho, Oregon, Washington.

  16. 78 FR 69625 - Approval and Promulgation of Implementation Plans; New York State Ozone Implementation Plan Revision

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-20

    ...] Approval and Promulgation of Implementation Plans; New York State Ozone Implementation Plan Revision AGENCY...) is proposing to approve a revision to the New York State Implementation Plan (SIP) for ozone... air quality standards for ozone. DATES: Comments must be received on or before December 20, 2013...

  17. 77 FR 13974 - Approval and Promulgation of Implementation Plans; New York State Ozone Implementation Plan Revision

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-08

    ... Promulgation of Implementation Plans; New York State Ozone Implementation Plan Revision AGENCY: Environmental... a proposed revision to the New York State Implementation Plan (SIP) for ozone concerning the control... national ambient air quality standards for ozone. DATES: Effective Date: This rule will be effective April...

  18. 13. Operational planning for a specific intervention.

    PubMed

    2014-05-01

    Every intervention must follow an operational plan. Operational plans delineate actions required to meet an objective that is part of the strategic plan (overarching goal). Operational plans dictate the critical pathways for the interventions that will be followed during and following the implementation of the intervention. Operational plans include: (1) an introduction and brief situation report; (2) an overview of the task(s), objectives, and the overarching goal to be addressed; (3) the methods that will be employed; (4) planning factors; (5) the resources that will be required including personnel, equipment, and supplies; (6) timelines, benchmarks, and milestones including their respective indicators, startup time, end point, and estimates of the time required for completion; (7) the administrative structure to be employed; (8) an operating budget; (9) the strategy for acquiring the funding required; (10) roles and responsibilities of the personnel including position descriptions and the competencies required of the personnel (skill sets); (11) mechanisms for monitoring the progress including the indicators that will be employed, (12) safety, including health of the personnel, required immunisations, accommodations, and reporting structure; (13) self-sufficiency; and (14) reporting and accounting. There are many generic items in an operational plan that can be used in successive plans. Without a detailed operational plan, interventions are doomed to probable failure and can profoundly negatively impact other projects operational in the area.

  19. Preliminary environmental assessment for the Satellite Power System (SPS). Volume 2: Detailed assessment

    NASA Technical Reports Server (NTRS)

    1978-01-01

    Volume 2 provides a preliminary assessment of the impact of the Satellite Power System (SPS) on the environment in a technically detailed format more suitable for peer review than the executive summary of Vol. 1. It serves to integrate and assimilate information that has appeared in documents referenced herein and to focus on issues that are purely environmental. It discloses the state-of-knowledge as perceived from recently completed DOE-sponsored studies and defines prospective research and study programs that can advance the state-of-knowledge and provide an expanded data base for use in an assessment planned for 1980. Alternatives for research that may be implemented in order to achieve this advancement are also discussed.

  20. Report of the AAPM Task Group No. 105: Issues associated with clinical implementation of Monte Carlo-based photon and electron external beam treatment planning.

    PubMed

    Chetty, Indrin J; Curran, Bruce; Cygler, Joanna E; DeMarco, John J; Ezzell, Gary; Faddegon, Bruce A; Kawrakow, Iwan; Keall, Paul J; Liu, Helen; Ma, C M Charlie; Rogers, D W O; Seuntjens, Jan; Sheikh-Bagheri, Daryoush; Siebers, Jeffrey V

    2007-12-01

    The Monte Carlo (MC) method has been shown through many research studies to calculate accurate dose distributions for clinical radiotherapy, particularly in heterogeneous patient tissues where the effects of electron transport cannot be accurately handled with conventional, deterministic dose algorithms. Despite its proven accuracy and the potential for improved dose distributions to influence treatment outcomes, the long calculation times previously associated with MC simulation rendered this method impractical for routine clinical treatment planning. However, the development of faster codes optimized for radiotherapy calculations and improvements in computer processor technology have substantially reduced calculation times to, in some instances, within minutes on a single processor. These advances have motivated several major treatment planning system vendors to embark upon the path of MC techniques. Several commercial vendors have already released or are currently in the process of releasing MC algorithms for photon and/or electron beam treatment planning. Consequently, the accessibility and use of MC treatment planning algorithms may well become widespread in the radiotherapy community. With MC simulation, dose is computed stochastically using first principles; this method is therefore quite different from conventional dose algorithms. Issues such as statistical uncertainties, the use of variance reduction techniques, the ability to account for geometric details in the accelerator treatment head simulation, and other features, are all unique components of a MC treatment planning algorithm. Successful implementation by the clinical physicist of such a system will require an understanding of the basic principles of MC techniques. The purpose of this report, while providing education and review on the use of MC simulation in radiotherapy planning, is to set out, for both users and developers, the salient issues associated with clinical implementation and experimental verification of MC dose algorithms. As the MC method is an emerging technology, this report is not meant to be prescriptive. Rather, it is intended as a preliminary report to review the tenets of the MC method and to provide the framework upon which to build a comprehensive program for commissioning and routine quality assurance of MC-based treatment planning systems.

  1. Implementation of a national anti-tuberculosis drug resistance survey in Tanzania

    PubMed Central

    Chonde, Timothy M; Doulla, Basra; van Leth, Frank; Mfinanga, Sayoki GM; Range, Nyagosya; Lwilla, Fred; Mfaume, Saidi M; van Deun, Armand; Zignol, Matteo; Cobelens, Frank G; Egwaga, Saidi M

    2008-01-01

    Background A drug resistance survey is an essential public health management tool for evaluating and improving the performance of National Tuberculosis control programmes. The current manuscript describes the implementation of the first national drug resistance survey in Tanzania. Methods Description of the implementation process of a national anti-tuberculosis drug resistance survey in Tanzania, in relation to the study protocol and Standard Operating Procedures. Results Factors contributing positively to the implementation of the survey were a continuous commitment of the key stakeholders, the existence of a well organized National Tuberculosis Programme, and a detailed design of cluster-specific arrangements for rapid sputum transportation. Factors contributing negatively to the implementation were a long delay between training and actual survey activities, limited monitoring of activities, and an unclear design of the data capture forms leading to difficulties in form-filling. Conclusion Careful preparation of the survey, timing of planned activities, a strong emphasis on data capture tools and data management, and timely supervision are essential for a proper implementation of a national drug resistance survey. PMID:19116022

  2. The implementation of the integrated design process in the hole-plan system

    NASA Astrophysics Data System (ADS)

    Ruy, Won-Sun; Ko, Dae-Eun; Yang, Young-Soon

    2012-12-01

    All current shipyards are using the customized CAD/CAM programs in order to improve the design quality and increase the design efficiency. Even though the data structures for ship design and construction are almost completed, the implementation related to the ship design processes are still in progress so that it has been the main causes of the bottleneck and delay during the middle of design process. In this study, we thought that the hole-plan system would be a good example which is remained to be improved. The people of outfitting division who don't have direct authority to edit the structural panels, should request the hull design division to install the holes for the outfitting equipment. For acceptance, they should calculate the hole position, determine the hole type, and find the intersected contour of panel. After consideration of the hull people, the requested holes are manually installed on the hull structure. As the above, many processes are needed such as communication and discussion between the divisions, drawings for hole-plan, and the consideration for the structural or production compatibility. However this iterative process takes a lot of working time and requires mental pressure to the related people and cross-division conflict. This paper will handle the hole-plan system in detail to automate the series of process and minimize the human efforts and time-consumption.

  3. Implementation of a Collision Probability Prediction Technique for Constellation Maneuver Planning

    NASA Technical Reports Server (NTRS)

    Concha, Marco a.

    2007-01-01

    On March 22, 2006, the Space Technology 5 (ST5) constellation spacecraft were successfully delivered to orbit by a Pegasus XI, launch vehicle. An unexpected relative motion experienced by the constellation after orbit insertion brought about a problem. Soon after launch the observed relative position of the inert rocket body was between the leading and the middle spacecraft within the constellation. The successful planning and execution of an orbit maneuver that would create a fly-by of the rocket body was required to establish the.formation. This maneuver would create a close approach that needed to conform to predefined collision probability requirements. On April 21, 2006, the ST5 "155" spacecraft performed a large orbit maneuver and successfully passed the inert Pegasus 3rd Stage Rocket Body on April 30, 2006 15:20 UTC at a distance of 2.55 km with a Probability of Collision of less than 1.0E-06. This paper will outline the technique that was implemented to establish the safe planning and execution of the fly-by maneuver. The method makes use of Gaussian distribution models of state covariance to determine underlying probabilities of collision that arise under low velocity encounters. Specific numerical examples used for this analysis are discussed in detail. The mechanics of this technique are explained to foster deeper understanding of the concepts presented and to improve existing processes for use in future constellation maneuver planning.

  4. Tracking implementation strategies: a description of a practical approach and early findings.

    PubMed

    Bunger, Alicia C; Powell, Byron J; Robertson, Hillary A; MacDowell, Hannah; Birken, Sarah A; Shea, Christopher

    2017-02-23

    Published descriptions of implementation strategies often lack precision and consistency, limiting replicability and slowing accumulation of knowledge. Recent publication guidelines for implementation strategies call for improved description of the activities, dose, rationale and expected outcome(s) of strategies. However, capturing implementation strategies with this level of detail can be challenging, as responsibility for implementation is often diffuse and strategies may be flexibly applied as barriers and challenges emerge. We describe and demonstrate the development and application of a practical approach to identifying implementation strategies used in research and practice that could be used to guide their description and specification. An approach to tracking implementation strategies using activity logs completed by project personnel was developed to facilitate identification of discrete strategies. This approach was piloted in the context of a multi-component project to improve children's access to behavioural health services in a county-based child welfare agency. Key project personnel completed monthly activity logs that gathered data on strategies used over 17 months. Logs collected information about implementation activities, intent, duration and individuals involved. Using a consensus approach, two sets of coders categorised each activity based upon Powell et al.'s (Med Care Res Rev 69:123-57, 2012) taxonomy of implementation strategies. Participants reported on 473 activities, which represent 45 unique strategies. Initial implementation was characterised by planning strategies followed by educational strategies. After project launch, quality management strategies predominated, suggesting a progression of implementation over time. Together, these strategies accounted for 1594 person-hours, many of which were reported by the leadership team that was responsible for project design, implementation and oversight. This approach allows for identifying discrete implementation strategies used over time, estimating dose, describing temporal ordering of implementation strategies, and pinpointing the major implementation actors. This detail could facilitate clear reporting of a full range of implementation strategies, including those that may be less observable. This approach could lead to a more nuanced understanding of what it takes to implement different innovations, the types of strategies that are most useful during specific phases of implementation, and how implementation strategies need to be adaptively applied throughout the course of a given initiative.

  5. Production of the next-generation library virtual tour

    PubMed Central

    Duncan, James M.; Roth, Linda K.

    2001-01-01

    While many libraries offer overviews of their services through their Websites, only a small number of health sciences libraries provide Web-based virtual tours. These tours typically feature photographs of major service areas along with textual descriptions. This article describes the process for planning, producing, and implementing a next-generation virtual tour in which a variety of media elements are integrated: photographic images, 360-degree “virtual reality” views, textual descriptions, and contextual floor plans. Hardware and software tools used in the project are detailed, along with a production timeline and budget, tips for streamlining the process, and techniques for improving production. This paper is intended as a starting guide for other libraries considering an investment in such a project. PMID:11837254

  6. The role of promotion in alcoholism treatment marketing.

    PubMed

    Jones, M A; Self, D R; Owens, C A; Kline, T A

    1988-01-01

    This article is an overview of the promotion function as a part of the ATM's marketing mix. It approaches various promotion decision areas from a managerial perspective, focusing upon some key components of promotion planning. Rather than provide specific operational or implementation details (how to write a brochure) it is more conceptual in nature and offers a framework for promotion planners. The article addresses promotion management, promotion objectives, analysis for promotion planning, the promotion mix, and addresses the benefits and limitations of some specific promotion tools available to the ATM manager. It treats ATMs as a service and reveals specific implications for promotion strategy dictated by services. The article also reports promotion tools employed by Alabama ATMs citing data from the Alabama study.

  7. Developing a Business Plan for Critical Care Pharmacy Services

    PubMed Central

    Erstad, Brian L.; Mann, Henry J.; Weber, Robert J.

    2016-01-01

    Critical care medicine has grown from a small group of physicians participating in patient care rounds in surgical and medical intensive care units (ICUs) to a highly technical, interdisciplinary team. Pharmacy's growth in the area of critical care is as exponential. Today's ICU requires a comprehensive pharmaceutical service that includes both operational and clinical services to meet patient medication needs. This article provides the elements for a business plan to justify critical care pharmacy services by describing the pertinent background and benefit of ICU pharmacy services, detailing a current assessment of ICU pharmacy services, listing the essential ICU pharmacy services, describing service metrics, and delineating an appropriate timeline for implementing an ICU pharmacy service. The structure and approach of this business plan can be applied to a variety of pharmacy services. By following the format and information listed in this article, the pharmacy director can move closer to developing patient-centered pharmacy services for ICU patients. PMID:27928193

  8. Developing a Business Plan for Critical Care Pharmacy Services.

    PubMed

    Erstad, Brian L; Mann, Henry J; Weber, Robert J

    2016-11-01

    Critical care medicine has grown from a small group of physicians participating in patient care rounds in surgical and medical intensive care units (ICUs) to a highly technical, interdisciplinary team. Pharmacy's growth in the area of critical care is as exponential. Today's ICU requires a comprehensive pharmaceutical service that includes both operational and clinical services to meet patient medication needs. This article provides the elements for a business plan to justify critical care pharmacy services by describing the pertinent background and benefit of ICU pharmacy services, detailing a current assessment of ICU pharmacy services, listing the essential ICU pharmacy services, describing service metrics, and delineating an appropriate timeline for implementing an ICU pharmacy service. The structure and approach of this business plan can be applied to a variety of pharmacy services. By following the format and information listed in this article, the pharmacy director can move closer to developing patient-centered pharmacy services for ICU patients.

  9. Application of GIS Technology for Town Planning Tasks Solving

    NASA Astrophysics Data System (ADS)

    Kiyashko, G. A.

    2017-11-01

    For developing territories, one of the most actual town-planning tasks is to find out the suitable sites for building projects. The geographic information system (GIS) allows one to model complex spatial processes and can provide necessary effective tools to solve these tasks. We propose several GIS analysis models which can define suitable settlement allocations and select appropriate parcels for construction objects. We implement our models in the ArcGIS Desktop package and verify by application to the existing objects in Primorsky Region (Primorye Territory). These suitability models use several variations of the analysis method combinations and include various ways to resolve the suitability task using vector data and a raster data set. The suitability models created in this study can be combined, and one model can be integrated into another as its part. Our models can be updated by other suitability models for further detailed planning.

  10. A comprehensive plan for helicopter drag reduction

    NASA Technical Reports Server (NTRS)

    Williams, R. M.; Montana, P. S.

    1975-01-01

    Current helicopters have parasite drag levels 6 to 10 times as great as fixed wing aircraft. The commensurate poor cruise efficiency results in a substantial degradation of potential mission capability. The paper traces the origins of helicopter drag and shows that the problem (primarily due to bluff body flow separation) can be solved by the adoption of a comprehensive research and development plan. This plan, known as the Fuselage Design Methodology, comprises both nonaerodynamic and aerodynamic aspects. The aerodynamics are discussed in detail and experimental and analytical programs are described which will lead to a solution of the bluff body problem. Some recent results of work conducted at the Naval Ship Research and Development Center (NSRDC) are presented to illustrate these programs. It is concluded that a 75-per cent reduction of helicopter drag is possible by the full implementation of the Fuselage Design Methodology.

  11. Approved Air Quality Implementation Plans in The Virgin Islands

    EPA Pesticide Factsheets

    This site contains information about air quality regulations called State Implementation Plans (SIPs), Federal Implementation Plans (FIPs), and Tribal Implementation Plans (TIPs) approved by EPA within the U.S. Virgin Islands.

  12. Software reuse issues affecting AdaNET

    NASA Technical Reports Server (NTRS)

    Mcbride, John G.

    1989-01-01

    The AdaNet program is reviewing its long-term goals and strategies. A significant concern is whether current AdaNet plans adequately address the major strategic issues of software reuse technology. The major reuse issues of providing AdaNet services that should be addressed as part of future AdaNet development are identified and reviewed. Before significant development proceeds, a plan should be developed to resolve the aforementioned issues. This plan should also specify a detailed approach to develop AdaNet. A three phased strategy is recommended. The first phase would consist of requirements analysis and produce an AdaNet system requirements specification. It would consider the requirements of AdaNet in terms of mission needs, commercial realities, and administrative policies affecting development, and the experience of AdaNet and other projects promoting the transfer software engineering technology. Specifically, requirements analysis would be performed to better understand the requirements for AdaNet functions. The second phase would provide a detailed design of the system. The AdaNet should be designed with emphasis on the use of existing technology readily available to the AdaNet program. A number of reuse products are available upon which AdaNet could be based. This would significantly reduce the risk and cost of providing an AdaNet system. Once a design was developed, implementation would proceed in the third phase.

  13. Using the intervention mapping protocol to develop a maintenance programme for the SLIMMER diabetes prevention intervention.

    PubMed

    Elsman, Ellen B M; Leerlooijer, Joanne N; Ter Beek, Josien; Duijzer, Geerke; Jansen, Sophia C; Hiddink, Gerrit J; Feskens, Edith J M; Haveman-Nies, Annemien

    2014-10-27

    Although lifestyle interventions have shown to be effective in reducing the risk for type 2 diabetes mellitus, maintenance of achieved results is difficult, as participants often experience relapse after the intervention has ended. This paper describes the systematic development of a maintenance programme for the extensive SLIMMER intervention, an existing diabetes prevention intervention for high-risk individuals, implemented in a real-life setting in the Netherlands. The maintenance programme was developed using the Intervention Mapping protocol. Programme development was informed by a literature study supplemented by various focus group discussions and feedback from implementers of the extensive SLIMMER intervention. The maintenance programme was designed to sustain a healthy diet and physical activity pattern by targeting knowledge, attitudes, subjective norms and perceived behavioural control of the SLIMMER participants. Practical applications were clustered into nine programme components, including sports clinics at local sports clubs, a concluding meeting with the physiotherapist and dietician, and a return session with the physiotherapist, dietician and physical activity group. Manuals were developed for the implementers and included a detailed time table and step-by-step instructions on how to implement the maintenance programme. The Intervention Mapping protocol provided a useful framework to systematically plan a maintenance programme for the extensive SLIMMER intervention. The study showed that planning a maintenance programme can build on existing implementation structures of the extensive programme. Future research is needed to determine to what extent the maintenance programme contributes to sustained effects in participants of lifestyle interventions.

  14. 77 FR 48061 - Approval and Promulgation of Air Quality Implementation Plans; Pennsylvania; Regional Haze State...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-13

    ... Promulgation of Air Quality Implementation Plans; Pennsylvania; Regional Haze State Implementation Plan...'s limited approval of Pennsylvania's Regional Haze State Implementation Plan (SIP). DATES: Effective... announcing our limited approval of Pennsylvania's Regional Haze SIP. In this document, we inadvertently...

  15. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Uluski, R.; Kumar, J.; Venkata, S. S. Mani

    The Philadelphia Navy Yard is a fast-evolving community microgrid, currently home to over 150 companies and four Navy activity centers occupying nearly 7 million ft2 of buildings in which approximately 12,000 people are employed. The Navy Yard (TNY) is a national center of excellence for energy research, education, and commercialization, focused specifically on community microgrid design and development. TNY microgrid is equipped with the most cost-effective and sustainable means for meeting electric capacity and energy needs through renewable resources, energy efficiency, and distribution grid infrastructure. This article briefly describes how the community microgrid was conceived and planned to produce amore » great success story of microgrid implementation and the details of the design, development, and implementation of the TNY microgrid controller.« less

  16. Instituting organizational learning for quality improvement through strategic planning nominal group processes.

    PubMed

    White, D B

    2000-01-01

    Healthcare managers are faced with unprecedented challenges as characterized by managed care constraints, downsizing, increased client needs, and a society demanding more responsive services. Managers must initiate change for quality, efficiency, and survival. This article provides information and strategies for (a) assessing the change readiness of an organization, (b) conducting an organizational diagnosis, (c) instituting a team culture, (d) developing a change strategy, (e) integrating the strategy with a quality improvement process, and (f) identifying the leadership skills to implement organization renewal. Nominal group processes, namely, SWOT and the Search Conference, are described, and case examples are provided. The implementation strategies have been used successfully in a variety of milieus; practical advice for success is described in detail.

  17. Intelsat TDMA and its implementation in Australia

    NASA Astrophysics Data System (ADS)

    Howe, Stuart

    The developmental history and characteristics of the Intelsat digital communications network are surveyed, with a focus on the current implementation status in Australia. Topics addressed include the fundamental principles and advantages of a TDMA system, the hardware required for a TDMA traffic station, and the Intelsat Indian Ocean Primary satellite network. Detailed consideration is given to TDMA test equipment (burst-mode link analyzers, PCM DSI test sets, burst-power meters, burst negators, and reference burst generators), terminal integration with terrestrial and RF links (TWT sharing and equalization), equipment compatibility, and traffic. Plans call for 950 TDMA circuits by the end of 1990, representing about 36.5 percent of the traffic between Australia and Europe, Africa, India and Pakistan, and the Middle East.

  18. Science operations planning and implementation for Rosetta

    NASA Astrophysics Data System (ADS)

    Koschny, Detlef; Sweeney, Mark; Montagon, Elsa; Hoofs, Raymond; van der Plas, Peter

    2002-07-01

    The Rosetta mission is a cornerstone mission of the Horizon 2000 programme of the European Space Agency. It will be launched to comet 46P/Wirtanen in January 2003. This mission is the first of a series of planetary missions, including Mars Express, Smart-I (to the Moon), and BepiColombo (to Mercury). All these missions have similar requirements for their scientific operations. The Experiments H/W and S/W are developed by Principal Investigators, working at scientific institutes. They are also responsible for the operation of their experiments and for the generation of related operational documentation. The Science Operations Centre (SOC) has the task to consolidate the inputs of the different experimenters and the Lander and ensure that the resulting science operations timeline is free of conflicts. It forwards this timeline to the Mission Operations Centre (MOC) which combines the science operations with the operations of the other spacecraft subsystems and the orbit and attitude of the spacecraft. The MOC is also responsible for uplinking the operational command sequences to the spacecraft and for returning the received telemetry to the user. In a collaboration between the team of the Rosetta Project Scientist at the Research and Science Support Department of ESA/ESTEC and the European Space Operations Centre (ESA/ESOC), a concept for the SOC/MOC and their interfaces was developed for the Rosetta mission. This concept is generic enough to allow its implementation also for the other planetary missions. The design phase is now complete, and implementation is on-going. This paper briefly presents the architecture of the complex ground segment, concentrating on the elements required for planning of scientific operations, and then details the software tools EPS (Experiment Planning System) and PTB (Project Test Bed) which are used in the planning process.

  19. Considerations in change management related to technology.

    PubMed

    Luo, John S; Hilty, Donald M; Worley, Linda L; Yager, Joel

    2006-01-01

    The authors describe the complexity of social processes for implementing technological change. Once a new technology is available, information about its availability and benefits must be made available to the community of users, with opportunities to try the innovations and find them worthwhile, despite organizational resistances. The authors reviewed the literature from psychiatry, psychology, sociology, business, and technology to distill common denominators for success and failure related to implementing technology. Beneficial technological innovations that are simple to use and obviously save everyone time and effort are easy to inaugurate. However, innovations that primarily serve management rather than subordinates or front-line utilizers may fail, despite considerable institutional effort. This article reviews and outlines several of the more prominent theoretical models governing successful institutional change. Successful implementation of difficult technological changes requires visionary leadership that has carefully considered the benefits, consulted with influence leaders at all organizational levels to spot unintended consequences and sources of resistance, and developed a detailed plan and continuous quality assurance process to foster implementation over time.

  20. GANDALF - Graphical Astrophysics code for N-body Dynamics And Lagrangian Fluids

    NASA Astrophysics Data System (ADS)

    Hubber, D. A.; Rosotti, G. P.; Booth, R. A.

    2018-01-01

    GANDALF is a new hydrodynamics and N-body dynamics code designed for investigating planet formation, star formation and star cluster problems. GANDALF is written in C++, parallelized with both OPENMP and MPI and contains a PYTHON library for analysis and visualization. The code has been written with a fully object-oriented approach to easily allow user-defined implementations of physics modules or other algorithms. The code currently contains implementations of smoothed particle hydrodynamics, meshless finite-volume and collisional N-body schemes, but can easily be adapted to include additional particle schemes. We present in this paper the details of its implementation, results from the test suite, serial and parallel performance results and discuss the planned future development. The code is freely available as an open source project on the code-hosting website github at https://github.com/gandalfcode/gandalf and is available under the GPLv2 license.

  1. 77 FR 5191 - Approval and Promulgation of Air Quality Implementation Plans; District of Columbia; Regional...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-02

    ... Promulgation of Air Quality Implementation Plans; District of Columbia; Regional Haze State Implementation Plan... of Columbia Regional Haze Plan, a revision to the District of Columbia State Implementation Plan (SIP... existing anthropogenic impairment of visibility in mandatory Class I areas through a regional haze program...

  2. The Community Connection Model: implementation of best evidence into practice for self-management of chronic diseases.

    PubMed

    Liddy, C; Johnston, S; Irving, H; Nash, K

    2013-06-01

    With chronic diseases becoming an increasing burden for healthcare systems worldwide, self-management support has gained traction in many health regions and organizations. However, the real-world application of the findings from clinical trials into actual community programming is not self-evident. The aim of this study was to present a model of programme implementation, namely the Community Connection Model. The process of implementing a chronic disease self-management programme has been documented in detail from its initial inception through to a sustainable programme. This account includes a description of the strategic activities undertaken (e.g. alignment with local policy and the formation of community partnerships) and the specific steps taken on the path to programme implementation (e.g. a scoping literature review, an environmental scan and a pilot programme with an evaluation component). Reflection on this case example suggests that a cognizance of the interactions between policy, partnership, planning and programme could act as a useful tool to guide programme implementation, evaluation and sustainability. Multiple types of self-management support have been implemented (as part of the Living Health Champlain programme), and are being evaluated and adapted in response to new evidence, shifting priorities and direction from more partners. The widespread access means that self-management support programmes are becoming part of the culture of care in the study region. Establishing a connection around an important health problem, ensuring active partnerships, adequate planning and early implementation of a programme grounded on the principles of applying best-available evidence can lead to successful solutions. The Community Connection Model is proposed as a way of conceptualizing these processes. Copyright © 2013 The Royal Society for Public Health. Published by Elsevier Ltd. All rights reserved.

  3. Nutrition and Physical Activity Strategies for Cancer Prevention in Current National Comprehensive Cancer Control Program Plans

    PubMed Central

    Puckett, Mary; Neri, Antonio; Underwood, J. Michael; Stewart, Sherri L.

    2016-01-01

    Obesity, diet and physical inactivity are risk factors for some cancers. Grantees of the National Comprehensive Cancer Control Program (NCCCP) in US states, tribes, and territories develop plans to coordinate funding and activities for cancer prevention and control. Including information and goals related to nutrition and physical activity (NPA) is a key opportunity for primary cancer prevention, but it is currently unclear to what extent NCCCP plans address these issues. We reviewed 69 NCCCP plans and searched for terms related to NPA. Plans were coded as (1) knowledge of NPA and cancer link; (2) goals to improve NPA behaviors; and (3) strategies to increase healthy NPA activities, environments, or systems changes. NPA content was consistently included in all cancer plans examined across all years. Only 4 (6 %) outlined only the relationship between NPA and cancer without goals or strategies. Fifty-nine plans (89 %) contained goals or strategies related to NPA, with 53 (82 %) including both. However, numbers of goals, strategies, and detail provided varied widely. All programs recognized the importance of NPA in cancer prevention. Most plans included NPA goals and strategies. Increasing the presence of NPA strategies that can be modified or adapted appropriately locally could help with more widespread implementation and measurement of NPA interventions. PMID:26994988

  4. Adding "Missed" Science to Cassini's Ops Plan

    NASA Technical Reports Server (NTRS)

    Roy, Mou; Burton, Marcia E.; Edgington, Scott; Pitesky, Jo E.; Steadman, Kimberly B.; Ray, Trina L.; Evans, Mike

    2014-01-01

    The phenomenal success of the Cassini Mission at Saturn is largely due to flagship instruments, in a target rich environment, for a long period of time, executing almost error free complex mission operations. A smooth transition from cruise operations through the prime science mission and extended science (Equinox) mission culminating in the currently executing Solstice mission has folded in necessary procedural alterations due to improved understanding of the spacecraft, instruments, uplink and planning systems as well as additional science objectives. These have come with the maturation of the mission along with management of workforce reductions. One important set of operational changes has been initiated due to scientific findings highlighting "missed" science opportunities. This is the case for the Titan Meteorology Campaigns and Saturn Storm Watch Campaigns. These observations involve long term monitoring of the atmospheres of Titan and Saturn while the spacecraft and science teams are focused on other high priority targets of opportunity (like Enceladus). Our objective in this paper is to emphasize how a non-invasive strategy to get additional remarkable science was conceived and implemented in a mission with an already well defined operational plan. To illustrate this we will detail Titan Meteorology Campaign and Saturn Storm Watch Campaign integration and implementation strategies as well as the scientific goals and achievements of both.

  5. Strategic environmental assessment (SEA) for wind energy planning: Lessons from the United Kingdom and Germany

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Phylip-Jones, J., E-mail: jonesjp@liverpool.ac.uk; Fischer, T.B., E-mail: fischer@liv.ac.uk

    This paper reports on SEA applied in the wind energy sector in the UK and Germany. Based on a review of 18 SEAs, it is found that the quality of SEA documentation is variable, with over a third of them being deemed unsatisfactory. Furthermore, SEA processes are conducted to varying degrees of effectiveness, with scoping a strength but impact prediction and mitigation weaknesses. Generally speaking, the influence of SEA on German wind energy plan making was found to be low and the influence of SEA on UK plans deemed to be moderate. The German plans had a low influence mainlymore » because of a perceived high environmental performance of the underlying plans in the first instance. Substantive outcomes of SEA are not always clear and the influence of SEA on decision making is said to be limited in many cases. Finally, a lack of effective tiering between SEA and project level EIA is also observed. In addition, our findings echo some of the weaknesses of SEA practice found in previous studies of SEA effectiveness, including poor impact prediction and significance sections and a lack of detailed monitoring programmes for post plan implementation.« less

  6. Consider long-term care as service alternative.

    PubMed

    Loria, L S

    1987-04-01

    The increasing demand for elderly care services, pressures on inpatient average length of stay and payment levels, and potential financial rewards from providing additional services, makes long-term care look attractive to hospitals. Long-term care, however, is not for every hospital. Before deciding to establish long-term care services, management should examine how the service fits within the hospital's strategic plan. The action plan below provides guidance in evaluating a decision to use hospital facilities for long-term care. Examine how long-term care services fit within the hospital's strategic plan. Study area demographics and competitors to assess the need and supply of long-term care services. Survey the medical staff, consumers and payers to determine attitudes, perceptions and interests regarding long-term care services. Develop a facility plan that identifies areas of excess capacity that can be most easily converted into long-term care with minimal effects on hospital operations. Prepare a financial feasibility analysis of the contribution margin and return on investment attributable to long-term care services. Include an impact analysis on hospital operations. Establish a management task force to develop a detailed implementation plan including assigned individual responsibilities and related timetable. Develop an effective marketing plan designed to generate increased patient market share.

  7. Dengue Contingency Planning: From Research to Policy and Practice

    PubMed Central

    Runge-Ranzinger, Silvia; Kroeger, Axel; Olliaro, Piero; McCall, Philip J.; Sánchez Tejeda, Gustavo; Lloyd, Linda S.; Hakim, Lokman; Bowman, Leigh R.; Horstick, Olaf; Coelho, Giovanini

    2016-01-01

    Background Dengue is an increasingly incident disease across many parts of the world. In response, an evidence-based handbook to translate research into policy and practice was developed. This handbook facilitates contingency planning as well as the development and use of early warning and response systems for dengue fever epidemics, by identifying decision-making processes that contribute to the success or failure of dengue surveillance, as well as triggers that initiate effective responses to incipient outbreaks. Methodology/Principal findings Available evidence was evaluated using a step-wise process that included systematic literature reviews, policymaker and stakeholder interviews, a study to assess dengue contingency planning and outbreak management in 10 countries, and a retrospective logistic regression analysis to identify alarm signals for an outbreak warning system using datasets from five dengue endemic countries. Best practices for managing a dengue outbreak are provided for key elements of a dengue contingency plan including timely contingency planning, the importance of a detailed, context-specific dengue contingency plan that clearly distinguishes between routine and outbreak interventions, surveillance systems for outbreak preparedness, outbreak definitions, alert algorithms, managerial capacity, vector control capacity, and clinical management of large caseloads. Additionally, a computer-assisted early warning system, which enables countries to identify and respond to context-specific variables that predict forthcoming dengue outbreaks, has been developed. Conclusions/Significance Most countries do not have comprehensive, detailed contingency plans for dengue outbreaks. Countries tend to rely on intensified vector control as their outbreak response, with minimal focus on integrated management of clinical care, epidemiological, laboratory and vector surveillance, and risk communication. The Technical Handbook for Surveillance, Dengue Outbreak Prediction/ Detection and Outbreak Response seeks to provide countries with evidence-based best practices to justify the declaration of an outbreak and the mobilization of the resources required to implement an effective dengue contingency plan. PMID:27653786

  8. 24 CFR 598.605 - Implementation plan.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 24 Housing and Urban Development 3 2014-04-01 2013-04-01 true Implementation plan. 598.605 Section 598.605 Housing and Urban Development Regulations Relating to Housing and Urban Development (Continued... Grants § 598.605 Implementation plan. (a) Implementation plan content. An EZ must submit an...

  9. 77 FR 41279 - Approval and Promulgation of Air Quality Implementation Plans; Pennsylvania; Regional Haze State...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-13

    ... Promulgation of Air Quality Implementation Plans; Pennsylvania; Regional Haze State Implementation Plan AGENCY... the Regional Haze State Implementation Plan (SIP) (hereafter RH SIP) revision submitted by the... anthropogenic impairment of visibility in mandatory Class I areas [[Page 41280

  10. 76 FR 12945 - Instructions for Implementing Climate Change Adaptation Planning in Accordance With Executive...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-09

    ... COUNCIL ON ENVIRONMENTAL QUALITY Instructions for Implementing Climate Change Adaptation Planning... Availability of Climate Change Adaptation Planning Implementing Instructions. SUMMARY: The Chair of the Council... for Implementing Climate Change Adaptation Planning are now available at: http://www.whitehouse.gov...

  11. Utilizing a Health Impact Assessment (HIA) to Connect Natural ...

    EPA Pesticide Factsheets

    Marrying scientific and health research with natural resource management should be a straightforward process. However, differences in purpose, goals, language, levels of detail and implementation authority between the scientists who conduct research and resource managers who plan and implement projects make it difficult for resource managers to include information not specific to the problem at hand. One method to overcome this barrier is a Health Impact Assessment (HIA) or process that uses scientific data, health expertise and public input to factor public health considerations into the decision-making process. An HIA informs decision makers and stakeholders of the potential health effects of a proposed program, policy, project or plan through a systematic investigation of impacts to health and health determinants and deliberative engagement of community members and other stakeholders throughout the HIA process. USEPA will be conducting an HIA on the Minnesota Department of Natural Resources’ sediment remediation and habitat restoration project at Kingsbury Bay and Grassy Point. This poster outlines the HIA process, illustrates how technical and stakeholder committees inform the process, and presents the determinants of health that will be explored in the HIA. not applicable

  12. Dynamic Modeling and Soil Mechanics for Path Planning of the Mars Exploration Rovers

    NASA Technical Reports Server (NTRS)

    Trease, Brian; Arvidson, Raymond; Lindemann, Randel; Bennett, Keith; Zhou, Feng; Iagnemma, Karl; Senatore, Carmine; Van Dyke, Lauren

    2011-01-01

    To help minimize risk of high sinkage and slippage during drives and to better understand soil properties and rover terramechanics from drive data, a multidisciplinary team was formed under the Mars Exploration Rover (MER) project to develop and utilize dynamic computer-based models for rover drives over realistic terrains. The resulting tool, named ARTEMIS (Adams-based Rover Terramechanics and Mobility Interaction Simulator), consists of the dynamic model, a library of terramechanics subroutines, and the high-resolution digital elevation maps of the Mars surface. A 200-element model of the rovers was developed and validated for drop tests before launch, using MSC-Adams dynamic modeling software. Newly modeled terrain-rover interactions include the rut-formation effect of deformable soils, using the classical Bekker-Wong implementation of compaction resistances and bull-dozing effects. The paper presents the details and implementation of the model with two case studies based on actual MER telemetry data. In its final form, ARTEMIS will be used in a predictive manner to assess terrain navigability and will become part of the overall effort in path planning and navigation for both Martian and lunar rovers.

  13. Enhancing In-Flight Transoceanic Communications Using Swift-64 Packet Mode Service

    NASA Technical Reports Server (NTRS)

    Slywczak, Richard A.

    2004-01-01

    Current aeronautical communications can be divided into two segments. The first provides state of the art, packet switched technology to the cabin passengers so that they have access to e-mail and web services. The second provides basic circuit switch communication technology to the cockpit, which does not use bandwidth as efficiently as packet switching nor promotes resource sharing. This paper explores the research efforts currently being conducted by the NASA/Glenn Research Center (GRC) for transoceanic communications. The goal is to bring packet mode services to both the cabin and the cockpit of the aircraft and be able to attain benefits by sharing the data link with cabin services. First, this paper will outline the goals of the program and detail the benefits and issues related to this research. We will explain our current laboratory setup and show an architecture implemented in the testbed. Finally, we will present a work plan that will show the progression of research over the next year. This plan will describe a complete cycle from conceptual design and laboratory implementation to the final flight testing.

  14. An anticipatory quality improvement process for curricular reform.

    PubMed

    Hollander, Harry; Loeser, Helen; Irby, David

    2002-09-01

    Over half of American medical schools are currently engaged in significant curricular reform. Traditionally, evaluation of the efficacy of educational changes has occurred well after the implementation of curricular reform, resulting in significant time elapsed before modification of goals and content can be accomplished. We were interested in establishing a process by which a new curriculum could be reviewed and refined before its actual introduction. The University of California, San Francisco (UCSF) School of Medicine embarked upon a new curriculum for the class entering in September 2001. Two separate committees coordinated plans for curricular change. The Essential Core Steering Committee was responsible for the first two years of training, and the Integrated Clinical Steering Committee guided the development of the third-and fourth-year curriculum. Both groups operated under guidelines of curricular reform, established by the School's Committee on Curriculum and Educational Policy, that emphasized integration of basic, clinical, and social sciences; longitudinal inclusion of themes such as behavior, culture, and ethics; use of clinical cases in teaching; and inclusion of small-group and problem-based learning. In early 2001, the deans of education and curricular affairs appointed an ad hoc committee to examine the status of the first-year curriculum, which had been entirely reformulated into a series of new multidisciplinary block courses. This ad hoc committee was composed of students and clinical faculty members who had not been substantially involved in the detailed planning of the blocks. The charge to the committee was to critique the progress of individual courses, and the first year as a whole, in meeting the goals outlined above, and to make recommendations for improving the preparation of students for the clinical years. To accomplish these goals, the committee reviewed background planning documents; interviewed each course director using a standardized set of questions; and examined course schedules, cases, and detailed learning objectives for particular sessions. In July 2001, the committee reported back to the deans with specific recommendations for coordinating the block courses, and about the success in creating integration and the overall balance of topics students would learn. Specific recommendations included increasing the use of pediatric and geriatric cases across courses, creating a case database, developing explicit plans to relocate uncovered material in the four-year curriculum, and bolstering participation of clinical faculty during the first-year blocks. These recommendations were then presented to and endorsed by the Essential Core Steering Committee, which implemented an action plan prior to the September 2001 start date. This proactive approach to quality improvement added an evaluation point before the new curriculum was actually unveiled. The anticipatory planning process substantially aided the interdisciplinary developmental process, increased input into the first-year curriculum by clerkship directors, and identified problems that would have otherwise become apparent after implementation. We believe this model adds value to the curriculum planning process.

  15. 40 CFR 52.672 - Approval of plans.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ...) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS Idaho § 52.672 Approval of plans. (a) Carbon Monoxide. (1) EPA approves as a revision to the Idaho State Implementation Plan, the Limited Maintenance Plan for.... [Reserved] (e) Particulate Matter. (1) EPA approves as a revision to the Idaho State Implementation Plan...

  16. 78 FR 17835 - Approval and Promulgation of Federal Implementation Plan for Oil and Natural Gas Well Production...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-22

    ...The EPA is taking final action to promulgate a Reservation- specific Federal Implementation Plan in order to regulate emissions from oil and natural gas production facilities located on the Fort Berthold Indian Reservation in North Dakota. The Federal Implementation Plan includes basic air quality regulations for the protection of communities in and adjacent to the Fort Berthold Indian Reservation. The Federal Implementation Plan requires owners and operators of oil and natural gas production facilities to reduce emissions of volatile organic compounds emanating from well completions, recompletions, and production and storage operations. This Federal Implementation Plan will be implemented by the EPA, or a delegated tribal authority, until replaced by a Tribal Implementation Plan. The EPA proposed a Reservation-specific Federal Implementation Plan concurrently with an interim final rule on August 15, 2012. This final Federal Implementation Plan replaces the interim final rule in all intents and purposes on the effective date of the final rule. The EPA is taking this action pursuant to the Clean Air Act (CAA).

  17. 40 CFR 270.18 - Specific part B information requirements for waste piles.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... complied with or detailed plans and an engineering report describing how the requirements of § 264.90(b)(2) will be met. (c) Detailed plans and an engineering report describing how the waste pile is designed and...(b) of this chapter, submit detailed plans, and engineering and hydrogeological reports, as...

  18. 40 CFR 270.18 - Specific part B information requirements for waste piles.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... complied with or detailed plans and an engineering report describing how the requirements of § 264.90(b)(2) will be met. (c) Detailed plans and an engineering report describing how the waste pile is designed and...(b) of this chapter, submit detailed plans, and engineering and hydrogeological reports, as...

  19. Phased Project Planning Guidelines

    NASA Technical Reports Server (NTRS)

    1968-01-01

    NHB 7121.2 is the initial publication of the guidelines for implementation of the Phased Project Planning (PPP) concept prescribed by NPD 7121,1A. These guidelines are applicable to the planning and approval activities which lead to the implementation of major new research and development projects as defined in NPD 7121.1A as well as to major modifications or extensions of approved projects. They should, therefore, be reflected in the Project Approval Documents which serve as the basic documentation for project definition, guidance and control throughout NASA. The purpose of PPP is to provide, through defined phases, an adequate basis for management decisions on the extent to which project activities can be properly undertaken and commitments made. However, these guidelines do not prescribe detailed format and content of plans and other documents and reports used to apply the PPP concept. Similarly, the work content of phases and the information requirements described herein are not checklists. They are included to assist in understanding the intent of the PPP concept and should not be viewed as rigid or inflexible. PPP, as a concept for orderly planning and definition of new major R&D undertakings, must be adapted to the peculiarities of each individual case. However, the flexibility permitted for adaptation should not be considered as a license for major variation which would compromise the objectives that underlie the concept. Cognizant NASA officials are expected to pursue their project planning and definition activities in reasonable conformance with these guidelines and to request only those exceptions or deviations which are clearly necessary and justified. These guidelines will be modified as determined necessary on the basis of experience. Comments or suggestions for changes should be directed to the Office of Organization and Management.

  20. Tsunami Preparedness, Response, Mitigation, and Recovery Planning in California

    NASA Astrophysics Data System (ADS)

    Miller, K.; Wilson, R. I.; Johnson, L. A.; Mccrink, T. P.; Schaffer, E.; Bower, D.; Davis, M.

    2016-12-01

    In California officials of state, federal, and local governments have coordinated to implement a Tsunami Preparedness and Mitigation Program. Building upon past preparedness efforts carried out year-round this group has leveraged government support at all levels. A primary goal is for everyone who lives at or visits the coast to understand basic life-safety measures when responding to official tsunami alerts or natural warnings. Preparedness actions include: observation of National Tsunami Preparedness Week, local "tsunami walk" drills, scenario-based exercises, testing of notification systems for public alert messaging, outreach materials, workshops, presentations, and media events.Program partners have worked together to develop emergency operations, evacuation plans, and tsunami annexes to plans for counties, cities, communities, and harbors in 20 counties along the coast. Working with the state and federal partner agencies, coastal communities have begun to incorporate sophisticated tsunami "Playbook" scenario information into their planning. These innovative tsunami evacuation and response tools provide detailed evacuation maps and associated real-time response information for identifying areas where flooding could occur. This is critical information for evacuating populations on land, near the shoreline.Acting on recommendations from the recent USGS-led, multi-discipline Science Application for Risk Reduction Tsunami Scenario report on impacts to California and American Society of Civil Engineering adoption proposals to the International Building Code, the state has begun to develop a strategy to incorporate probabilistic tsunami findings into state level policy recommendations for addressing building code adoption, as well as approach land use planning and building code implementation in local jurisdictions. Additional efforts, in the context of sustained community resiliency, include developing recovery planning guidance for local communities.

  1. 24 CFR 598.605 - Implementation plan.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 24 Housing and Urban Development 3 2012-04-01 2012-04-01 false Implementation plan. 598.605 Section 598.605 Housing and Urban Development Regulations Relating to Housing and Urban Development... Empowerment Zone Grants § 598.605 Implementation plan. (a) Implementation plan content. An EZ must submit an...

  2. 24 CFR 598.605 - Implementation plan.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 24 Housing and Urban Development 3 2013-04-01 2013-04-01 false Implementation plan. 598.605 Section 598.605 Housing and Urban Development Regulations Relating to Housing and Urban Development... Empowerment Zone Grants § 598.605 Implementation plan. (a) Implementation plan content. An EZ must submit an...

  3. 78 FR 68005 - Approval and Promulgation of Implementation Plans; Mississippi; Transportation Conformity SIP...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-13

    ... this Federal Register, EPA is approving the State's implementation plan revision as a direct final rule...] Approval and Promulgation of Implementation Plans; Mississippi; Transportation Conformity SIP--Memorandum... proposing to approve a State Implementation Plan revision submitted by the Mississippi Department of...

  4. Effective protection of open space: does planning matter?

    PubMed

    Steelman, Toddi A; Hess, George R

    2009-07-01

    High quality plans are considered a crucial part of good land use planning and often used as a proxy measure for success in plan implementation and goal attainment. We explored the relationship of open space plan quality to the implementation of open space plans and attainment of open space protection goals in Research Triangle, North Carolina, USA. To measure plan quality, we used a standard plan evaluation matrix that we modified to focus on open space plans. We evaluated all open space plans in the region that contained a natural resource protection element. To measure plan implementation and open space protection, we developed an online survey and administered it to open space planners charged with implementing the plans. The survey elicited each planner's perspective on aspects of open space protection in his or her organization. The empirical results (1) indicate that success in implementation and attaining goals are not related to plan quality, (2) highlight the importance of when and how stakeholders are involved in planning and implementation processes, and (3) raise questions about the relationship of planning to implementation. These results suggest that a technically excellent plan does not guarantee the long-term relationships among local land owners, political and appointed officials, and other organizations that are crucial to meeting land protection goals. A greater balance of attention to the entire decision process and building relationships might lead to more success in protecting open space.

  5. Liberalization of the Spanish electricity sector: An advanced model

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Unda, J.I.

    1998-06-01

    Spain`s electricity industry is being restructured to provide a competitive generation market, a regulated, open access transmission and distribution system, and phased-in customer choice. But while the reform is radical in its objectives, it will be gradual in its implementation. This article briefly describes the current state of affairs within the Spanish electricity sector and details the reform plans set out in the act, focusing on the adopted institutional design and the established transition period. It also offers an overview of the role that the regulatory authority will play throughout the process.

  6. A Qualitative Case Study on the Implementation of a Priority Seating Program at an NCAA Division I School

    DTIC Science & Technology

    2004-08-01

    green earth.. .It’s Badger hockey fans who research the name of the mother of an opposing team’s goalie so as to better inform their heckling.. .It’s the...Center and is information pulled directly from the aforementioned document ’The Kohl Center: Basketball Ticket Plan." 84 The athletic department began...our development staff which was initially housed over at the UW Foundation.. .we really hammered out the details and logistics of pulling a

  7. Turf Conversion Measurement and Verification Protocol

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kurnik, Charles W.; Stoughton, Kate M.; Figueroa, Jorge

    This measurement and verification (M and V) protocol provides procedures for energy service companies (ESCOs) and water efficiency service companies (WESCOs) to determine water savings as a result of water conservation measures (WCMs) in energy performance contracts associated with converting turfgrass or other water-intensive plantings to water-wise and sustainable landscapes. The water savings are determined by comparing the baseline water use to the water use after the WCM has been implemented. This protocol outlines the basic structure of the M and V plan, and details the procedures to use to determine water savings.

  8. Information Management System for the California State Water Resources Control Board (SWRCB)

    NASA Technical Reports Server (NTRS)

    Heald, T. C.; Redmann, G. H.

    1973-01-01

    A study was made to establish the requirements for an integrated state-wide information management system for water quality control and water quality rights for the State of California. The data sources and end requirements were analyzed for the data collected and used by the numerous agencies, both State and Federal, as well as the nine Regional Boards under the jurisdiction of the State Board. The report details the data interfaces and outlines the system design. A program plan and statement of work for implementation of the project is included.

  9. 78 FR 41731 - Source Specific Federal Implementation Plan for Implementing Best Available Retrofit Technology...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-11

    ... Federal Implementation Plan for Implementing Best Available Retrofit Technology for Four Corners Power... Implementation Plan (FIP) to implement the Best Available Retrofit Technology (BART) requirement of the Regional... given the uncertainties in the electrical market in Arizona, EPA is proposing to extend the date by...

  10. Characterizing Rosetta Stone Exoplanets with JWST Transit Spectroscopy

    NASA Astrophysics Data System (ADS)

    Lewis, Nikole K.; Clampin, Mark; Seager, Sara; Valenti, Jeff A.; Mountain, Matt; JWST Telescope Scientist GTO Team

    2017-06-01

    JWST will for the first time provide for spectroscopic (R > 100) observation of systems hosting transiting exoplanets over the critical wavelength range from 0.6 to 28.5 microns. Our team will take advantage of JWST's spectral coverage and resolution to characterize a small number of exoplanets in exquisite detail. We plan to focus our efforts on single representative members of the hot-Jupiter, warm-Neptune, and temperate-Earth populations in both transmission and emission over the full wavelength range of JWST. Our JWST observations will hopefully become 'Rosetta Stones' that will serve as benchmarks for further observations of planets within each representative population and a lasting legacy of the JWST mission. Here we will describe our observational plan and how we turned our science goals into an implemented Cycle 1 JWST program.

  11. 78 FR 40654 - Approval, Disapproval and Promulgation of Implementation Plans; State of Wyoming; Regional Haze...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-08

    ..., Disapproval and Promulgation of Implementation Plans; State of Wyoming; Regional Haze State Implementation Plan; Federal Implementation Plan for Regional Haze; Notice of Public Hearings AGENCY: Environmental...) addressing regional haze under. We are making this change in response to letters submitted by the Governor of...

  12. 78 FR 78310 - Approval and Promulgation of Implementation Plans; North Carolina; Transportation Conformity...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-26

    ... Federal Register, EPA is approving the State's implementation plan revision as a direct final rule without...] Approval and Promulgation of Implementation Plans; North Carolina; Transportation Conformity Memorandum of... Implementation Plan submitted on July 12, 2013, through the North Carolina Department of Environment and Natural...

  13. 77 FR 58072 - Finding of Substantial Inadequacy of Implementation Plan; Call for California State...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-19

    ... Substantial Inadequacy of Implementation Plan; Call for California State Implementation Plan Revision; South Coast AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule. SUMMARY: In response to a... that the California State Implementation Plan (SIP) for the Los Angeles-South Coast Air Basin (South...

  14. 78 FR 30770 - Approval and Promulgation of Air Quality Implementation Plans; Illinois; Air Quality Standards...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-23

    ... Promulgation of Air Quality Implementation Plans; Illinois; Air Quality Standards Revision AGENCY... Illinois state implementation plan (SIP) to reflect current National Ambient Air Quality Standards (NAAQS... Implementation Plan at 35 Illinois Administrative Code part 243, which updates National Ambient Air Quality...

  15. Developing an information systems strategy for nursing.

    PubMed

    Callanan, K M; Hughes, S J

    1995-01-01

    With the rapidly changing health care environment and information technology advances, organizations need to engage in strategic, planned change in order to allocate limited resources, achieve the organization's goals, and fulfill its mission [1]. One of the most important aspects of the organization's planned strategies for change concerns the information systems. The involvement of the nursing department in this process is critical. This poster presentation will communicate how nurses can develop an information systems strategic plan that will enable them to play an active role as contributors and vital participants in the strategic and business planning processes for information systems. This information systems strategy for nursing will: a) provide direction and purpose, b) guide nursing in identifying the kinds of information technology needed, c) assist in timely implementation of a system that supports nursing, and d) identify desired outcomes and benefits of an information system. The nursing information systems plan must be built on, and support, the organization's mission and business plan and integrate into the over-all information systems plans [2]. Components of the nursing strategic plan include the nursing mission statement and vision, an assessment of the current environment to identify supporting technology needed to achieve the nursing vision, expectations/anticipated outcomes, environmental considerations, and special staffing/expertise considerations. The nursing vision and mission statement is an articulation of the overall direction and purpose of the nursing organization. An assessment of the nursing organization, problem areas, opportunities for growth, the physical environment, existing systems, communications requirements, and resources is carried out to help identify areas where new technologies and automated methods of managing information could be applied. Special staffing and expertise not currently available in the organization, but necessary to the successful implementation of the plan, should be identified, and plans for filling those needs should be included in the planning and prioritization process. Based on the mission and assessment findings, goals or anticipated outcomes are developed. These goals must be realistic, financially feasible, and logistically achievable; they should also provide direction for action and decision-making [3]. Measurable objectives and detailed action plans can then be developed from these goals when implementation of this aspect of the strategic plan is begun. It is especially important, even at a strategic planning level, to consider change management techniques, including specific steps to involve individuals who will be affected by the change and to ensure open communication throughout the process. Efforts to collaborate with all affected departments and to offer input and educational opportunities to the various members of the health care team should be included in the strategic plan. A business plan describing the mission, goals, and objectives for a specific system implementation is the final step in the strategic planning process. The business plan includes expected outcomes and cost justification and may be done in cooperation with other departments (in the organization) that will be involved with this system. The business plan is used to communicate the information system's needs to the administration and governing board of the organization. With a good information systems strategy, nursing will be prepared to make more timely and better informed decisions related to applying information technology within the nursing department. The end results of this planning should be evident in the improved utilization of information technology to support the nursing vision and mission.

  16. FIRE STATION AND GUARD HOUSE, PLANS AND DETAILS. Plan No. ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    FIRE STATION AND GUARD HOUSE, PLANS AND DETAILS. Plan No. 6754-319, dated August 1, 1933. Construction Division, Office of the Constructing Quartermaster - Hamilton Field, Fire Station & Guard House, Southwest corner of Seventh Street & Hangar Avenue, Novato, Marin County, CA

  17. Accessibility and implementation in UK services of an effective depression relapse prevention programme – mindfulness-based cognitive therapy (MBCT): ASPIRE study protocol

    PubMed Central

    2014-01-01

    Background Mindfulness-based cognitive therapy (MBCT) is a cost-effective psychosocial prevention programme that helps people with recurrent depression stay well in the long term. It was singled out in the 2009 National Institute for Health and Clinical Excellence (NICE) Depression Guideline as a key priority for implementation. Despite good evidence and guideline recommendations, its roll-out and accessibility across the UK appears to be limited and inequitably distributed. The study aims to describe the current state of MBCT accessibility and implementation across the UK, develop an explanatory framework of what is hindering and facilitating its progress in different areas, and develop an Implementation Plan and related resources to promote better and more equitable availability and use of MBCT within the UK National Health Service. Methods/Design This project is a two-phase qualitative, exploratory and explanatory research study, using an interview survey and in-depth case studies theoretically underpinned by the Promoting Action on Implementation in Health Services (PARIHS) framework. Interviews will be conducted with stakeholders involved in commissioning, managing and implementing MBCT services in each of the four UK countries, and will include areas where MBCT services are being implemented successfully and where implementation is not working well. In-depth case studies will be undertaken on a range of MBCT services to develop a detailed understanding of the barriers and facilitators to implementation. Guided by the study’s conceptual framework, data will be synthesized across Phase 1 and Phase 2 to develop a fit for purpose implementation plan. Discussion Promoting the uptake of evidence-based treatments into routine practice and understanding what influences these processes has the potential to support the adoption and spread of nationally recommended interventions like MBCT. This study could inform a larger scale implementation trial and feed into future implementation of MBCT with other long-term conditions and associated co-morbidities. It could also inform the implementation of interventions that are acceptable and effective, but are not widely accessible or implemented. PMID:24884603

  18. Redefining Tactical Operations for MER Using Cloud Computing

    NASA Technical Reports Server (NTRS)

    Joswig, Joseph C.; Shams, Khawaja S.

    2011-01-01

    The Mars Exploration Rover Mission (MER) includes the twin rovers, Spirit and Opportunity, which have been performing geological research and surface exploration since early 2004. The rovers' durability well beyond their original prime mission (90 sols or Martian days) has allowed them to be a valuable platform for scientific research for well over 2000 sols, but as a by-product it has produced new challenges in providing efficient and cost-effective tactical operational planning. An early stage process adaptation was the move to distributed operations as mission scientists returned to their places of work in the summer of 2004, but they would still came together via teleconference and connected software to plan rover activities a few times a week. This distributed model has worked well since, but it requires the purchase, operation, and maintenance of a dedicated infrastructure at the Jet Propulsion Laboratory. This server infrastructure is costly to operate and the periodic nature of its usage (typically heavy usage for 8 hours every 2 days) has made moving to a cloud based tactical infrastructure an extremely tempting proposition. In this paper we will review both past and current implementations of the tactical planning application focusing on remote plan saving and discuss the unique challenges present with long-latency, distributed operations. We then detail the motivations behind our move to cloud based computing services and as well as our system design and implementation. We will discuss security and reliability concerns and how they were addressed

  19. An Internationally Coordinated Science Management Plan for Samples Returned from Mars

    NASA Astrophysics Data System (ADS)

    Haltigin, T.; Smith, C. L.

    2015-12-01

    Mars Sample Return (MSR) remains a high priority of the planetary exploration community. Such an effort will undoubtedly be too large for any individual agency to conduct itself, and thus will require extensive global cooperation. To help prepare for an eventual MSR campaign, the International Mars Exploration Working Group (IMEWG) chartered the international Mars Architecture for the Return of Samples (iMARS) Phase II working group in 2014, consisting of representatives from 17 countries and agencies. The overarching task of the team was to provide recommendations for progressing towards campaign implementation, including a proposed science management plan. Building upon the iMARS Phase I (2008) outcomes, the Phase II team proposed the development of an International MSR Science Institute as part of the campaign governance, centering its deliberations around four themes: Organization: including an organizational structure for the Institute that outlines roles and responsibilities of key members and describes sample return facility requirements; Management: presenting issues surrounding scientific leadership, defining guidelines and assumptions for Institute membership, and proposing a possible funding model; Operations & Data: outlining a science implementation plan that details the preliminary sample examination flow, sample allocation process, and data policies; and Curation: introducing a sample curation plan that comprises sample tracking and routing procedures, sample sterilization considerations, and long-term archiving recommendations. This work presents a summary of the group's activities, findings, and recommendations, highlighting the role of international coordination in managing the returned samples.

  20. The Woodlands Metro Center energy study. Case studies of project planning and design for energy conservation

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1980-03-01

    Appendix II of The Woodlands Metro Center Energy Study near Houston consists of the following: Metro Center Program, Conventional Plan Building Prototypes and Detail Parcel Analysis, Energy Plan Building Prototypes, and Energy Plan Detail Parcel Analysis.

  1. 40 CFR 52.1392 - Federal Implementation Plan for the Billings/Laurel Area.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 4 2013-07-01 2013-07-01 false Federal Implementation Plan for the Billings/Laurel Area. 52.1392 Section 52.1392 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) Montana § 52.1392 Federal Implementation Plan for...

  2. 40 CFR 52.1392 - Federal Implementation Plan for the Billings/Laurel Area.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 4 2012-07-01 2012-07-01 false Federal Implementation Plan for the Billings/Laurel Area. 52.1392 Section 52.1392 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) Montana § 52.1392 Federal Implementation Plan for...

  3. 40 CFR 52.1392 - Federal Implementation Plan for the Billings/Laurel Area.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 4 2014-07-01 2014-07-01 false Federal Implementation Plan for the Billings/Laurel Area. 52.1392 Section 52.1392 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) Montana § 52.1392 Federal Implementation Plan for...

  4. 40 CFR 52.1392 - Federal Implementation Plan for the Billings/Laurel Area.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 4 2011-07-01 2011-07-01 false Federal Implementation Plan for the Billings/Laurel Area. 52.1392 Section 52.1392 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) Montana § 52.1392 Federal Implementation Plan for...

  5. 77 FR 16937 - Approval and Promulgation of Air Quality Implementation Plans; West Virginia; Regional Haze State...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-23

    ... Promulgation of Air Quality Implementation Plans; West Virginia; Regional Haze State Implementation Plan AGENCY... limited disapproval of West Virginia's Regional Haze State Implementation Plan (SIP) revision. EPA is... mandatory Class I areas through a regional haze program. EPA is also approving this revision as meeting the...

  6. 77 FR 65151 - Finding of Substantial Inadequacy of Implementation Plan; Call for California State...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-25

    ... the Federal Register on September 19, 2012. In that action, in response to a remand by the Ninth... Substantial Inadequacy of Implementation Plan; Call for California State Implementation Plan Revision; South... State Implementation Plan (SIP) for the Los Angeles-South Coast Air Basin (South Coast) is substantially...

  7. 40 CFR 93.118 - Criteria and procedures: Motor vehicle emissions budget.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... PLANS Conformity to State or Federal Implementation Plans of Transportation Plans, Programs, and..., consultation among federal, State, and local agencies occurred; full implementation plan documentation was... response to comments that are required to be submitted with any implementation plan. EPA will document its...

  8. 40 CFR 93.118 - Criteria and procedures: Motor vehicle emissions budget.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... PLANS Conformity to State or Federal Implementation Plans of Transportation Plans, Programs, and..., consultation among federal, State, and local agencies occurred; full implementation plan documentation was... response to comments that are required to be submitted with any implementation plan. EPA will document its...

  9. Automated personnel data base system specifications, Task V. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bartley, H.J.; Bocast, A.K.; Deppner, F.O.

    1978-09-01

    This document is the General Research Corporation report on Task V of a study for the Office of Inspection and Enforcement of the Nuclear Regulatory Commission (NRC/IE). The full title of this study is ''Development of Qualification Requirements, Training Programs, Career Plans, and Methodologies for Effective Management and Training of Inspection and Enforcement Personnel.'' Task V required the development of an automated personnel data base system for NRC/IE. This system is identified as the NRC/IE Personnel, Assignment, Qualifications, and Training System (PAQTS). This Task V report provides the documentation for PAQTS including the Functional Requirements Document (FRD), the Data Requirementsmore » Document (DRD), the Hardware and Software Capabilities Assessment, and the Detailed Implementation Schedule. Specific recommendations to facilitate implementation of PAQTS are also included.« less

  10. Linking research to practice: the organisation and implementation of The Netherlands health and social care improvement programmes.

    PubMed

    Ovretveit, John; Klazinga, Niek

    2013-02-01

    Both public and private health and social care services are facing increased and changing demands to improve quality and reduce costs. To enable local services to respond to these demands, governments and other organisations have established large scale improvement programmes. These usually seek to enable many services to make changes to apply proven improvements and to make use of quality improvement methods. The purpose of this paper is to provide an empirical description of how one organisation coordinated ten national improvement programmes between 2004 and 2010. It provides details which may be useful to others seeking to plan and implement such programmes, and also contributes to the understanding of knowledge translation and of network governance. Copyright © 2012 Elsevier Ireland Ltd. All rights reserved.

  11. 40 CFR 49.10046 - Contents of implementation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Plan for the Cow Creek Band of Umpqua Indians of Oregon § 49.10046 Contents of implementation plan. The implementation plan for the Reservation of the Cow Creek Band of Umpqua Indians consists of the following rules...

  12. Best practices of Building Information Modelling (BIM) implementation in design phase for construction project

    NASA Astrophysics Data System (ADS)

    Kasim, N.; Zainal Abidin, N. A.; Zainal, R.; Sarpin, N.; Rahim, M. H. I. Abd; Saikah, M.

    2017-11-01

    Implementation of Building Information Modelling (BIM) was expected to bring improvement in current practices of Malaysian construction industry. In the design phase, there is a lack of a ready pool of skilled workers who are able to develop BIM strategic plan and effectively utilise it. These create boundaries for BIM nature in Malaysian construction industry specifically in the design phase to achieve its best practices. Therefore, the objectives of this research are to investigate the current practices of BIM implementation in the design phase as well as the best practices factors of BIM implementation in the design phase. The qualitative research approach is carried out through semi-structured interviews with the designers of different organisations which adopt BIM in the design phase. Data collection is analysed by executing content analysis method. From the findings, the best practices factors of BIM implementation in design phase such as the incentive for BIM training, formal approach to monitoring automated Level of Detailing (LOD), run a virtual meeting and improve Industry Foundation Class (IFC). Thus, best practices factors which lead to practices improvements in the design phase of project development which subsequently improves the implementation of BIM in the design phase of Malaysian construction industry.

  13. Implementing a Capital Plan.

    ERIC Educational Resources Information Center

    Daigneau, William A.

    2003-01-01

    Addresses four questions regarding implementation of a long-term capital plan to manage a college's facilities portfolio: When should the projects be implemented? How should the capital improvements be implemented? What will it actually cost in terms of project costs as well as operating costs? Who will implement the plan? (EV)

  14. 40 CFR 52.1973 - Approval of plans.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ...) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) Oregon § 52.1973 Approval of plans. (a) Carbon monoxide. (1) EPA approves as a revision to the Oregon State Implementation Plan, the Second... December 27, 2004. (2) EPA approves as a revision to the Oregon State Implementation Plan, the Salem carbon...

  15. 40 CFR 52.1973 - Approval of plans.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ...) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) Oregon § 52.1973 Approval of plans. (a) Carbon monoxide. (1) EPA approves as a revision to the Oregon State Implementation Plan, the Second... December 27, 2004. (2) EPA approves as a revision to the Oregon State Implementation Plan, the Salem carbon...

  16. 40 CFR 52.1973 - Approval of plans.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ...) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) Oregon § 52.1973 Approval of plans. (a) Carbon monoxide. (1) EPA approves as a revision to the Oregon State Implementation Plan, the Second... December 27, 2004. (2) EPA approves as a revision to the Oregon State Implementation Plan, the Salem carbon...

  17. 40 CFR 52.1973 - Approval of plans.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ...) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) Oregon § 52.1973 Approval of plans. (a) Carbon monoxide. (1) EPA approves as a revision to the Oregon State Implementation Plan, the Second... December 27, 2004. (2) EPA approves as a revision to the Oregon State Implementation Plan, the Salem carbon...

  18. 49 CFR 633.27 - Implementation of a project management plan.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 7 2010-10-01 2010-10-01 false Implementation of a project management plan. 633... TRANSIT ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Plans § 633.27 Implementation of a project management plan. (a) Upon approval of a project management plan by...

  19. 49 CFR 633.27 - Implementation of a project management plan.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 7 2011-10-01 2011-10-01 false Implementation of a project management plan. 633... TRANSIT ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Plans § 633.27 Implementation of a project management plan. (a) Upon approval of a project management plan by...

  20. 49 CFR 633.27 - Implementation of a project management plan.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 49 Transportation 7 2012-10-01 2012-10-01 false Implementation of a project management plan. 633... TRANSIT ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Plans § 633.27 Implementation of a project management plan. (a) Upon approval of a project management plan by...

  1. 49 CFR 633.27 - Implementation of a project management plan.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 49 Transportation 7 2014-10-01 2014-10-01 false Implementation of a project management plan. 633... TRANSIT ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Plans § 633.27 Implementation of a project management plan. (a) Upon approval of a project management plan by...

  2. 49 CFR 633.27 - Implementation of a project management plan.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 49 Transportation 7 2013-10-01 2013-10-01 false Implementation of a project management plan. 633... TRANSIT ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Plans § 633.27 Implementation of a project management plan. (a) Upon approval of a project management plan by...

  3. 76 FR 9706 - Finding of Substantial Inadequacy of Implementation Plan; Call for Iowa State Implementation Plan...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-22

    ... advance and available for prompt implementation once triggered. Section 110(k)(5) of the CAA provides that... Environmental protection, Air pollution control, Iowa, Particulate matter, State Implementation Plan. Dated...

  4. Implementation and outcomes of commercial disease management programs in the United States: the disease management outcomes consolidation survey.

    PubMed

    Fitzner, Karen; Fox, Kathe; Schmidt, Joseph; Roberts, Mark; Rindress, Donna; Hay, Joel

    2005-08-01

    Despite widespread adoption of disease management (DM) programs by US health plans, gaps remain in the evidence for their benefit. The Disease Management Outcomes Consolidation Survey was designed to gather data on DM programs for commercial health plans, to assess program success and DM effectiveness. The questionnaire was mailed to 292 appropriate health plan contacts; 26 plans covering more than 14 million commercial members completed and returned the survey. Respondents reported that DM plays a significant and increasing role in their organizations. Key reasons for adopting DM were improving clinical outcomes, reducing medical costs and utilization, and improving member satisfaction. More respondents were highly satisfied with clinical results than with utilization or cost outcomes of their programs (46%, 17%, and 13%, respectively). Detailed results were analyzed for 57 DM programs with over 230,000 enrollees. Most responding plans offered DM programs for diabetes and asthma, with return on investment (ROI) ranging from 0.16:1 to 4:1. Weighted by number of enrollees per DM program, average ROI was 2.56:1 for asthma (n = 1,136 enrollees) and 1.98:1 for diabetes (n = 25,364). Most (but not all) respondents reported reduced hospital admissions, increasing rates of preventive care, and improved clinical measures. Few respondents provided detailed information about DM programs for other medical conditions, but most that did reported positive outcomes. Lack of standardized methodology was identified as a major barrier to in-house program evaluation. Although low response rate precluded drawing many general conclusions, a clear need emerged for more rigorous evaluation methods and greater standardization of outcomes measurement.

  5. Implementation of marine spatial planning in shellfish aquaculture management: modeling studies in a Norwegian fjord.

    PubMed

    Filgueira, Ramon; Grant, Jon; Strand, Øivind

    2014-06-01

    Shellfish carrying capacity is determined by the interaction of a cultured species with its ecosystem, which is strongly influenced by hydrodynamics. Water circulation controls the exchange of matter between farms and the adjacent areas, which in turn establishes the nutrient supply that supports phytoplankton populations. The complexity of water circulation makes necessary the use of hydrodynamic models with detailed spatial resolution in carrying capacity estimations. This detailed spatial resolution also allows for the study of processes that depend on specific spatial arrangements, e.g., the most suitable location to place farms, which is crucial for marine spatial planning, and consequently for decision support systems. In the present study, a fully spatial physical-biogeochemical model has been combined with scenario building and optimization techniques as a proof of concept of the use of ecosystem modeling as an objective tool to inform marine spatial planning. The object of this exercise was to generate objective knowledge based on an ecosystem approach to establish new mussel aquaculture areas in a Norwegian fjord. Scenario building was used to determine the best location of a pump that can be used to bring nutrient-rich deep waters to the euphotic layer, increasing primary production, and consequently, carrying capacity for mussel cultivation. In addition, an optimization tool, parameter estimation (PEST), was applied to the optimal location and mussel standing stock biomass that maximize production, according to a preestablished carrying capacity criterion. Optimization tools allow us to make rational and transparent decisions to solve a well-defined question, decisions that are essential for policy makers. The outcomes of combining ecosystem models with scenario building and optimization facilitate planning based on an ecosystem approach, highlighting the capabilities of ecosystem modeling as a tool for marine spatial planning.

  6. Facilitating large-scale implementation of evidence based health care: insider accounts from a co-operative inquiry.

    PubMed

    Waterman, Heather; Boaden, Ruth; Burey, Lorraine; Howells, Brook; Harvey, Gill; Humphreys, John; Rothwell, Katy; Spence, Michael

    2015-02-13

    Facilitators are known to be influential in the implementation of evidence-based health care (EBHC). However, little evidence exists on what it is that they do to support the implementation process. This research reports on how knowledge transfer associates (KTAs) working as part of the UK National Institute for Health Research 'Collaboration for Leadership in Applied Health Research and Care' for Greater Manchester (GM CLAHRC) facilitated the implementation of EBHC across several commissioning and provider health care agencies. A prospective co-operative inquiry with eight KTAs was carried out comprising of 11 regular group meetings where they reflected critically on their experiences. Twenty interviews were also conducted with other members of the GM CLAHRC Implementation Team to gain their perspectives of the KTAs facilitation role and process. There were four phases to the facilitation of EBHC on a large scale: (1) Assisting with the decision on what EBHC to implement, in this phase, KTAs pulled together people and disparate strands of information to facilitate a decision on which EBHC should be implemented; (2) Planning of the implementation of EBHC, in which KTAs spent time gathering additional information and going between key people to plan the implementation; (3) Coordinating and implementing EBHC when KTAs recruited general practices and people for the implementation of EBHC; and (4) Evaluating the EBHC which required the KTAs to set up (new) systems to gather data for analysis. Over time, the KTAs demonstrated growing confidence and skills in aspects of facilitation: research, interpersonal communication, project management and change management skills. The findings provide prospective empirical data on the large scale implementation of EBHC in primary care and community based organisations focusing on resources and processes involved. Detailed evidence shows facilitation is context dependent and that 'one size does not fits all'. Co-operative inquiry was a useful method to enhance KTAs learning. The evidence shows that facilitators need tailored support and education, during the process of implementation to provide them with a well-rounded skill-set. Our study was not designed to demonstrate how facilitators contribute to patient health outcomes thus further prospective research is required.

  7. Goal setting and action planning in the rehabilitation setting: development of a theoretically informed practice framework.

    PubMed

    Scobbie, Lesley; Dixon, Diane; Wyke, Sally

    2011-05-01

    Setting and achieving goals is fundamental to rehabilitation practice but has been criticized for being a-theoretical and the key components of replicable goal-setting interventions are not well established. To describe the development of a theory-based goal setting practice framework for use in rehabilitation settings and to detail its component parts. Causal modelling was used to map theories of behaviour change onto the process of setting and achieving rehabilitation goals, and to suggest the mechanisms through which patient outcomes are likely to be affected. A multidisciplinary task group developed the causal model into a practice framework for use in rehabilitation settings through iterative discussion and implementation with six patients. Four components of a goal-setting and action-planning practice framework were identified: (i) goal negotiation, (ii) goal identification, (iii) planning, and (iv) appraisal and feedback. The variables hypothesized to effect change in patient outcomes were self-efficacy and action plan attainment. A theory-based goal setting practice framework for use in rehabilitation settings is described. The framework requires further development and systematic evaluation in a range of rehabilitation settings.

  8. Technology in education: A guidebook for developing a science and math education support program

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Wagner, C.L.

    1992-09-01

    Education is vital to survival and success in an increasingly technical world, and the quality of education is the responsibility of everyone students, teachers, parents, industry, and government. Any technical organization wanting to contribute to that success through its local education system can do so easily and effectively through careful planning. This report details that planning process and includes methods to (1) identify the interests, strengths, and resources of the technical organization; (2) identify the needs of the local education system; (3) interface with local school system administration, principals, and teachers; and (4) develop a unique plan to match themore » organization's strengths and resources with the needs of the school system. Following these getting started'' activities is the actual program that the Engineering Technology Division implemented in a local elementary school, including the curriculum, topics, and actual lesson plans used by technical personnel in the classroom. Finally, there are enrichment activities for teachers and students, suggestions for measuring the success of an education support program, and an overview of student responses to questions about the overall program.« less

  9. Technology in education: A guidebook for developing a science and math education support program

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Wagner, C.L.

    1992-09-01

    Education is vital to survival and success in an increasingly technical world, and the quality of education is the responsibility of everyone students, teachers, parents, industry, and government. Any technical organization wanting to contribute to that success through its local education system can do so easily and effectively through careful planning. This report details that planning process and includes methods to (1) identify the interests, strengths, and resources of the technical organization; (2) identify the needs of the local education system; (3) interface with local school system administration, principals, and teachers; and (4) develop a unique plan to match themore » organization`s strengths and resources with the needs of the school system. Following these ``getting started`` activities is the actual program that the Engineering Technology Division implemented in a local elementary school, including the curriculum, topics, and actual lesson plans used by technical personnel in the classroom. Finally, there are enrichment activities for teachers and students, suggestions for measuring the success of an education support program, and an overview of student responses to questions about the overall program.« less

  10. Measles and Rubella Global Strategic Plan 2012-2020 midterm review report: Background and summary.

    PubMed

    Orenstein, Walter A; Cairns, Lisa; Hinman, Alan; Nkowane, Benjamin; Olivé, Jean-Marc; Reingold, Arthur L

    2018-01-11

    Measles, a vaccine-preventable illness, is one of the most infectious diseases known to man. In 2015, an estimated 134,200 measles deaths occurred globally. Rubella, also vaccine-preventable, is a concern because infection during pregnancy can result in congenital defects in the baby. More than 100,000 babies with congenital rubella syndrome were estimated to have been born globally in 2010. Eradication of both measles and rubella is considered to be feasible, beneficial, and more cost-effective than high-level control. All six World Health Organization (WHO) regions have measles elimination goals by 2020 and two have rubella elimination goals by that year. However, the World Health Assembly has not endorsed a global eradication goal for either disease. In 2012, the Measles and Rubella Initiative published a Global Measles and Rubella Strategic Plan, 2012-2020, referred to hereafter as the Plan, which aimed to achieve measles and rubella elimination in at least five WHO regions by end-2020 through the implementation of five core strategies, with progress evaluated against 2015 milestones. When, by end-2015, none of these milestones had been met, WHO's Strategic Advisory Group of Experts on Immunization (SAGE) recommended a mid-term review of the Plan to evaluate progress toward goals, assess the quality of strategy implementation, and formulate lessons learned. A five-member team reviewed documents and conducted interviews with stakeholders as the basis for the review's conclusions and recommendations. This team concluded that, although significant progress in measles elimination had been made, progress had slowed. It recommended that countries continue to work toward elimination goals with a focus on strengthening ongoing immunization systems. In addition, it concluded that the strategies articulated in the Plan were sound, however full implementation had been impeded by inadequate country ownership and global political will, reflected in inadequate resources. Detailed recommendations for each of the Plan's five strategies as well as the areas of polio transition, governance and resource mobilization are outlined. Copyright © 2017 World Health Organization. Published by Elsevier Ltd.. All rights reserved.

  11. Developing and Implementing a Citywide Asthma Action Plan: A Community Collaborative Partnership.

    PubMed

    Staudt, Amanda Marie; Alamgir, Hasanat; Long, Debra Lynn; Inscore, Stephen Curtis; Wood, Pamela Runge

    2015-12-01

    Asthma affects 1 in 10 children in the United States, with higher prevalence among children living in poverty. Organizations in San Antonio, Texas, partnered to design and implement a uniform, citywide asthma action plan to improve asthma management capacity in schools. The asthma action plan template was modified from that of the Global Initiative for Asthma. School personnel were trained in symptom recognition, actions to take, and use of equipment before the asthma action plan implementation. The annual Asthma Action Plan Summit was organized as a forum for school nurses, healthcare providers, and members of the community to exchange ideas and strategies on implementation, as well as to revise the plan. The asthma action plan was implemented in all 16 local school districts. Feedback received from school nurses suggests that the citywide asthma action plan resulted in improved asthma management and student health at schools. The evidence in this study suggests that community organizations can successfully collaborate to implement a citywide health initiative similar to the asthma action plan.

  12. Participatory System Dynamics Modeling: Increasing Stakeholder Engagement and Precision to Improve Implementation Planning in Systems.

    PubMed

    Zimmerman, Lindsey; Lounsbury, David W; Rosen, Craig S; Kimerling, Rachel; Trafton, Jodie A; Lindley, Steven E

    2016-11-01

    Implementation planning typically incorporates stakeholder input. Quality improvement efforts provide data-based feedback regarding progress. Participatory system dynamics modeling (PSD) triangulates stakeholder expertise, data and simulation of implementation plans prior to attempting change. Frontline staff in one VA outpatient mental health system used PSD to examine policy and procedural "mechanisms" they believe underlie local capacity to implement evidence-based psychotherapies (EBPs) for PTSD and depression. We piloted the PSD process, simulating implementation plans to improve EBP reach. Findings indicate PSD is a feasible, useful strategy for building stakeholder consensus, and may save time and effort as compared to trial-and-error EBP implementation planning.

  13. A streamlined sustainability assessment tool for improved decision making in the urban water industry.

    PubMed

    Schulz, Matthias; Short, Michael D; Peters, Gregory M

    2012-01-01

    Water supply is a key consideration in sustainable urban planning. Ideally, detailed quantitative sustainability assessments are undertaken during the planning stage to inform the decision-making process. In reality, however, the significant time and cost associated with undertaking such detailed environmental and economic assessments is often cited as a barrier to wider implementation of these key decision support tools, particularly for decisions made at the local or regional government level. In an attempt to overcome this barrier of complexity, 4 water service providers in Melbourne, Australia, funded the development of a publicly available streamlined Environmental Sustainability Assessment Tool, which is aimed at a wide range of decision makers to assist them in broadening the type and number of water servicing options that can be considered for greenfield or backlog developments. The Environmental Sustainability Assessment Tool consists of a simple user interface and draws on life cycle inventory data to allow for rapid estimation of the environmental and economic performance of different water servicing scenarios. Scenario options can then be further prioritized by means of an interactive multicriteria analysis. The intent of this article is to identify the key issues to be considered in a streamlined sustainability assessment tool for the urban water industry, and to demonstrate the feasibility of generating accurate life cycle assessments and life cycle costings, using such a tool. We use a real-life case study example consisting of 3 separate scenarios for a planned urban development to show that this kind of tool can emulate life cycle assessments and life cycle costings outcomes obtained through more detailed studies. This simplified approach is aimed at supporting "sustainability thinking" early in the decision-making process, thereby encouraging more sustainable water and sewerage infrastructure solutions. Copyright © 2011 SETAC.

  14. 30 CFR 784.16 - Reclamation plan: Siltation structures, impoundments, and refuse piles.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ..., and refuse piles. (a) General. Each application must include a general plan and a detailed design plan... survey describing the potential effect on the structure from subsidence of the subsurface strata... certification statement which includes a schedule setting forth the dates when any detailed design plans for...

  15. 30 CFR 780.25 - Reclamation plan: Siltation structures, impoundments, and refuse piles.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ..., and refuse piles. (a) General. Each application must include a general plan and a detailed design plan... survey describing the potential effect on the structure from subsidence of the subsurface strata... certification statement which includes a schedule setting forth the dates that any detailed design plans for...

  16. 30 CFR 784.16 - Reclamation plan: Siltation structures, impoundments, and refuse piles.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ..., and refuse piles. (a) General. Each application must include a general plan and a detailed design plan... survey describing the potential effect on the structure from subsidence of the subsurface strata... certification statement which includes a schedule setting forth the dates when any detailed design plans for...

  17. Multigeneration data migration from legacy systems

    NASA Astrophysics Data System (ADS)

    Ratib, Osman M.; Liu, Brent J.; Kho, Hwa T.; Tao, Wenchao; Wang, Cun; McCoy, J. Michael

    2003-05-01

    The migration of image data from different generations of legacy archive systems represents a technical challenge and in incremental cost in transitions to newer generations of PACS. UCLA medical center has elected to completely replace the existing PACS infrastructure encompassing several generations of legacy systems by a new commercial system providing enterprise-wide image management and communication. One of the most challenging parts of the project was the migration of large volumes of legacy images into the new system. Planning of the migration required the development of specialized software and hardware, and included different phases of data mediation from existing databases to the new PACS database prior to the migration of the image data. The project plan included a detailed analysis of resources and cost of data migration to optimize the process and minimize the delay of a hybrid operation where the legacy systems need to remain operational. Our analysis and project planning showed that the data migration represents the most critical path in the process of PACS renewal. Careful planning and optimization of the project timeline and resources allocated is critical to minimize the financial impact and the time delays that such migrations can impose on the implementation plan.

  18. 75 FR 54805 - Approval and Promulgation of Air Quality Implementation Plans; Minnesota; Carbon Monoxide (CO...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-09

    ... Promulgation of Air Quality Implementation Plans; Minnesota; Carbon Monoxide (CO) Limited Maintenance Plan for... June 16, 2010, to revise the Minnesota State Implementation Plan (SIP) for carbon monoxide (CO) under the Clean Air Act (CAA). The State has submitted a limited maintenance plan for CO showing continued...

  19. 40 CFR 49.9861 - Identification of plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation Plan for the Burns Paiute Tribe of the Burns Paiute Indian Colony of Oregon § 49.9861 Identification of plan. This section and §§ 49.9862 through 49.9890 contain the implementation plan for the Burns Paiute Tribe of the Burns...

  20. 75 FR 63139 - Approval and Promulgation of Implementation Plans-Maricopa County (Phoenix) PM-10 Nonattainment...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-14

    ... Promulgation of Implementation Plans--Maricopa County (Phoenix) PM-10 Nonattainment Area; Serious Area Plan for... implementation plan (SIP) revisions submitted by the State of Arizona to meet, among other requirements, section... (Maricopa area). Specifically, EPA proposed to disapprove provisions of the 189(d) plan because they do not...

  1. Co-optimizing Generation and Transmission Expansion with Wind Power in Large-Scale Power Grids Implementation in the US Eastern Interconnection

    DOE PAGES

    You, Shutang; Hadley, Stanton W.; Shankar, Mallikarjun; ...

    2016-01-12

    This paper studies the generation and transmission expansion co-optimization problem with a high wind power penetration rate in the US Eastern Interconnection (EI) power grid. In this paper, the generation and transmission expansion problem for the EI system is modeled as a mixed-integer programming (MIP) problem. Our paper also analyzed a time series generation method to capture the variation and correlation of both load and wind power across regions. The obtained series can be easily introduced into the expansion planning problem and then solved through existing MIP solvers. Simulation results show that the proposed planning model and series generation methodmore » can improve the expansion result significantly through modeling more detailed information of wind and load variation among regions in the US EI system. Moreover, the improved expansion plan that combines generation and transmission will aid system planners and policy makers to maximize the social welfare in large-scale power grids.« less

  2. Access to capital--a growing concern.

    PubMed

    Carlson, Donald A

    2004-01-01

    Access to capital over the next ten years will be one of the biggest challenges healthcare organizations will face as they strive to remain competitive and serve their communities. Meeting the growing needs for capital will require a disciplined and honest assessment of the capital sources that will be available and the best ways of positioning an organization to maximize their uses. It is incumbent on chief executive officers and other senior leaders to create a disciplined process for allocating capital and conveying how that process will be linked to the organization's strategic plan. All of the credit constituencies "buying" healthcare need to fully understand how the organization is positioning itself for future growth and success, and detailed bond marketing plans need to be implemented well before the actual sale of a new bond issue. Large and small healthcare providers will have sufficient access to capital in the future if investors believe that senior hospital executives have a credible plan and are disciplined enough to execute it.

  3. The new medicare drug benefit: formularies and their potential effects on access to medications.

    PubMed

    Huskamp, Haiden A; Keating, Nancy L

    2005-07-01

    During congressional debate over the Medicare Part D prescription drug benefit, much attention was focused on nominal benefit design. Relatively little attention was paid to details about how plans would operate, such as the design of drug formularies. Yet, formularies will be important tools for controlling costs, and may be as important as nominal benefit design in determining enrollees' access to medications and out-of-pocket costs. We describe Part D plan incentives and how they may influence formulary design, and then provide recommendations for Part D formulary implementation. We encourage the Centers for Medicare & Medicaid Services (CMS) to develop standardized tools to provide physicians and patients with up-to-date and easily accessible information about covered drugs on each plan's formulary (perhaps via a central website) and a national set of easy-to-follow procedures for reconsideration and appeals. Such efforts should reduce administrative burden and better allow physicians to help patients obtain needed medications.

  4. Investing in breastfeeding - the world breastfeeding costing initiative.

    PubMed

    Holla-Bhar, Radha; Iellamo, Alessandro; Gupta, Arun; Smith, Julie P; Dadhich, Jai Prakash

    2015-01-01

    Despite scientific evidence substantiating the importance of breastfeeding in child survival and development and its economic benefits, assessments show gaps in many countries' implementation of the 2003 WHO and UNICEF Global Strategy for Infant and Young Child Feeding (Global Strategy). Optimal breastfeeding is a particular example: initiation of breastfeeding within the first hour of birth, exclusive breastfeeding for the first six months; and continued breastfeeding for two years or more, together with safe, adequate, appropriate, responsive complementary feeding starting in the sixth month. While the understanding of "optimal" may vary among countries, there is a need for governments to facilitate an enabling environment for women to achieve optimal breastfeeding. Lack of financial resources for key programs is a major impediment, making economic perspectives important for implementation. Globally, while achieving optimal breastfeeding could prevent more than 800,000 under five deaths annually, in 2013, US$58 billion was spent on commercial baby food including milk formula. Support for improved breastfeeding is inadequately prioritized by policy and practice internationally. The World Breastfeeding Costing Initiative (WBCi) launched in 2013, attempts to determine the financial investment that is necessary to implement the Global Strategy, and to introduce a tool to estimate the costs for individual countries. The article presents detailed cost estimates for implementing the Global Strategy, and outlines the WBCi Financial Planning Tool. Estimates use demographic data from UNICEF's State of the World's Children 2013. The WBCi takes a programmatic approach to scaling up interventions, including policy and planning, health and nutrition care systems, community services and mother support, media promotion, maternity protection, WHO International Code of Marketing of Breastmilk Substitutes implementation, monitoring and research, for optimal breastfeeding practices. The financial cost of a program to implement the Global Strategy in 214 countries is estimated at US $17.5 billion ($130 per live birth). The major recurring cost is maternity entitlements. WBCi is a policy advocacy initiative to encourage integrated actions that enable breastfeeding. WBCi will help countries plan and prioritize actions and budget them accurately. International agencies and donors can also use the tool to calculate or track investments in breastfeeding.

  5. 40 CFR 256.42 - Recommendations for assuring facility development.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... WASTES GUIDELINES FOR DEVELOPMENT AND IMPLEMENTATION OF STATE SOLID WASTE MANAGEMENT PLANS Facility Planning and Implementation § 256.42 Recommendations for assuring facility development. (a) The State plan... facilities, and (4) Development of schedules of implementation. (d) The State plan should encourage private...

  6. 40 CFR 256.42 - Recommendations for assuring facility development.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... WASTES GUIDELINES FOR DEVELOPMENT AND IMPLEMENTATION OF STATE SOLID WASTE MANAGEMENT PLANS Facility Planning and Implementation § 256.42 Recommendations for assuring facility development. (a) The State plan... facilities, and (4) Development of schedules of implementation. (d) The State plan should encourage private...

  7. 40 CFR 256.42 - Recommendations for assuring facility development.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... WASTES GUIDELINES FOR DEVELOPMENT AND IMPLEMENTATION OF STATE SOLID WASTE MANAGEMENT PLANS Facility Planning and Implementation § 256.42 Recommendations for assuring facility development. (a) The State plan... facilities, and (4) Development of schedules of implementation. (d) The State plan should encourage private...

  8. 75 FR 3680 - Revisions to the California State Implementation Plan

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-22

    ... the California State Implementation Plan AGENCY: Environmental Protection Agency (EPA). ACTION... Pollution Control District (SJVAPCD) portion of the California State Implementation Plan (SIP). These... are taking comments on this proposal and plan to follow with a final action. DATES: Any comments must...

  9. 49 CFR 130.33 - Response plan implementation.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 49 Transportation 2 2014-10-01 2014-10-01 false Response plan implementation. 130.33 Section 130... SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION OIL TRANSPORTATION OIL SPILL PREVENTION AND RESPONSE PLANS § 130.33 Response plan implementation. If, during transportation of oil subject to this part, a...

  10. 49 CFR 130.33 - Response plan implementation.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 2 2010-10-01 2010-10-01 false Response plan implementation. 130.33 Section 130... SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION OIL TRANSPORTATION OIL SPILL PREVENTION AND RESPONSE PLANS § 130.33 Response plan implementation. If, during transportation of oil subject to this part, a...

  11. 49 CFR 130.33 - Response plan implementation.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 2 2011-10-01 2011-10-01 false Response plan implementation. 130.33 Section 130... SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION OIL TRANSPORTATION OIL SPILL PREVENTION AND RESPONSE PLANS § 130.33 Response plan implementation. If, during transportation of oil subject to this part, a...

  12. 49 CFR 130.33 - Response plan implementation.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 49 Transportation 2 2012-10-01 2012-10-01 false Response plan implementation. 130.33 Section 130... SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION OIL TRANSPORTATION OIL SPILL PREVENTION AND RESPONSE PLANS § 130.33 Response plan implementation. If, during transportation of oil subject to this part, a...

  13. 49 CFR 130.33 - Response plan implementation.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 49 Transportation 2 2013-10-01 2013-10-01 false Response plan implementation. 130.33 Section 130... SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION OIL TRANSPORTATION OIL SPILL PREVENTION AND RESPONSE PLANS § 130.33 Response plan implementation. If, during transportation of oil subject to this part, a...

  14. 76 FR 28195 - Approval and Promulgation of Air Quality Implementation Plans; New Mexico; Sunland Park 1-Hour...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-16

    ... Promulgation of Air Quality Implementation Plans; New Mexico; Sunland Park 1-Hour Ozone Maintenance Plan AGENCY... the New Mexico State Implementation Plan (SIP). The revision consists of a maintenance plan for Sunland Park, New Mexico developed to ensure continued attainment of the 8-hour ozone National Ambient Air...

  15. MO-E-BRD-01: Adapt-A-Thon - Texas Hold’em Invitational

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kessler, M; Brock, K; Pouliot, J

    2014-06-15

    Software tools for image-based adaptive radiotherapy such as deformable image registration, contour propagation and dose mapping have progressed beyond the research setting and are now commercial products available as part of both treatment planning systems and stand-alone applications. These software tools are used together to create clinical workflows to detect, track and evaluate changes in the patient and to accumulate dose. Deviations uncovered in this process are used to guide decisions about replanning/adaptation with the goal of keeping the delivery of prescribed dose “on target” throughout the entire course of radiotherapy. Since the output from one step of the adaptivemore » process is used as an input for another, it is essential to understand and document the uncertainty associated with each of the step and how these uncertainties are propagated. This in turn requires an understanding how the underlying tools work. Unfortunately, important details about the algorithms used to implement these tools are scarce or incomplete, too often for competitive reasons. This is in contrast to the situation involving other basic treatment planning algorithms such as dose calculations, where the medical physics community essentially requires vendors to provide physically important details about their underlying theory and clinical implementation. Vendors should adopt this same level of information sharing when it comes to the tools and techniques for image guided adaptive radiotherapy. The goal of this session is to start this process by inviting vendors and medical physicists to discuss and demonstrate the available tools and describe how they are intended to be used in clinical practice. The format of the session will involve a combination of formal presentations, interactive demonstrations, audience participation and some friendly “Texas style” competition. Learning Objectives: Understand the components of the image-based adaptive radiotherapy process. Understand the how these components are implemented in various commercial systems. Understand the different use cases and workflows currently supported these tools.« less

  16. Design and Implementation of the PMS Module for ’Argos’

    DTIC Science & Technology

    1989-12-01

    designing , and implementing a fully workable Planned Maintenance System (PMS). This implementation demonstrates both the capabilities and benefits such a...analyzing, designing , and implementing a fully workable Planned Maintenance System (PMS). This implementation demonstrates both the capabilities and... design and implementation. PMS is the system developed by the navy to provide each ship, department, and supervisor with the tools needed to plan

  17. Implementation of Discharge Plans for Chronically Ill Elders Discharged Home.

    ERIC Educational Resources Information Center

    Proctor, Enola K.; And Others

    1996-01-01

    Addresses the extent to which discharge plans for elderly patients with congestive heart failure were implemented as planned, tested the consequences of implementation problems, and identified factors associated with implementation problems. Implications for hospital discharge planners and home health care are discussed. (KW)

  18. The Active for Life Year 5 (AFLY5) school-based cluster randomised controlled trial protocol: detailed statistical analysis plan.

    PubMed

    Lawlor, Debbie A; Peters, Tim J; Howe, Laura D; Noble, Sian M; Kipping, Ruth R; Jago, Russell

    2013-07-24

    The Active For Life Year 5 (AFLY5) randomised controlled trial protocol was published in this journal in 2011. It provided a summary analysis plan. This publication is an update of that protocol and provides a detailed analysis plan. This update provides a detailed analysis plan of the effectiveness and cost-effectiveness of the AFLY5 intervention. The plan includes details of how variables will be quality control checked and the criteria used to define derived variables. Details of four key analyses are provided: (a) effectiveness analysis 1 (the effect of the AFLY5 intervention on primary and secondary outcomes at the end of the school year in which the intervention is delivered); (b) mediation analyses (secondary analyses examining the extent to which any effects of the intervention are mediated via self-efficacy, parental support and knowledge, through which the intervention is theoretically believed to act); (c) effectiveness analysis 2 (the effect of the AFLY5 intervention on primary and secondary outcomes 12 months after the end of the intervention) and (d) cost effectiveness analysis (the cost-effectiveness of the AFLY5 intervention). The details include how the intention to treat and per-protocol analyses were defined and planned sensitivity analyses for dealing with missing data. A set of dummy tables are provided in Additional file 1. This detailed analysis plan was written prior to any analyst having access to any data and was approved by the AFLY5 Trial Steering Committee. Its publication will ensure that analyses are in accordance with an a priori plan related to the trial objectives and not driven by knowledge of the data. ISRCTN50133740.

  19. Social Impact Management Plans: Innovation in corporate and public policy

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Franks, Daniel M., E-mail: d.franks@uq.edu.au; Vanclay, Frank, E-mail: frank.vanclay@rug.nl

    Social Impact Assessment (SIA) has traditionally been practiced as a predictive study for the regulatory approval of major projects, however, in recent years the drivers and domain of focus for SIA have shifted. This paper details the emergence of Social Impact Management Plans (SIMPs) and undertakes an analysis of innovations in corporate and public policy that have put in place ongoing processes – assessment, management and monitoring – to better identify the nature and scope of the social impacts that might occur during implementation and to proactively respond to change across the lifecycle of developments. Four leading practice examples aremore » analyzed. The International Finance Corporation (IFC) Performance Standards require the preparation of Environmental and Social Management Plans for all projects financed by the IFC identified as having significant environmental and social risks. Anglo American, a major resources company, has introduced a Socio-Economic Assessment Toolbox, which requires mine sites to undertake regular assessments and link these assessments with their internal management systems, monitoring activities and a Social Management Plan. In South Africa, Social and Labour Plans are submitted with an application for a mining or production right. In Queensland, Australia, Social Impact Management Plans were developed as part of an Environmental Impact Statement, which included assessment of social impacts. Collectively these initiatives, and others, are a practical realization of theoretical conceptions of SIA that include management and monitoring as core components of SIA. The paper concludes with an analysis of the implications for the practice of impact assessment including a summary of key criteria for the design and implementation of effective SIMPs. -- Highlights: • Social impact management plans are effective strategies to manage social issues. • They are developed in partnership with regulatory agencies, investors and community. • SIMPs link assessment to ongoing management and address social and community issues. • SIMPs clarify responsibilities in the management of impacts, opportunities and risks. • SIMPs demonstrate a shift to include management as a core component of SIA practice.« less

  20. An evaluation of security measures implemented to address physical threats to water infrastructure in the state of Mississippi.

    PubMed

    Barrett, Jason R; French, P Edward

    2013-01-01

    The events of September 11, 2001, increased and intensified domestic preparedness efforts in the United States against terrorism and other threats. The heightened focus on protecting this nation's critical infrastructure included legislation requiring implementation of extensive new security measures to better defend water supply systems against physical, chemical/biological, and cyber attacks. In response, municipal officials have implemented numerous safeguards to reduce the vulnerability of these systems to purposeful intrusions including ongoing vulnerability assessments, extensive personnel training, and highly detailed emergency response and communication plans. This study evaluates fiscal year 2010 annual compliance assessments of public water systems with security measures that were implemented by Mississippi's Department of Health as a response to federal requirements to address these potential terrorist threats to water distribution systems. The results show that 20 percent of the water systems in this state had at least one security violation on their 2010 Capacity Development Assessment, and continued perseverance from local governments is needed to enhance the resiliency and robustness of these systems against physical threats.

  1. PACS project management utilizing web-based tools

    NASA Astrophysics Data System (ADS)

    Patel, Sunil; Levin, Brad; Gac, Robert J., Jr.; Harding, Douglas, Jr.; Chacko, Anna K.; Radvany, Martin; Romlein, John R.

    2000-05-01

    As Picture Archiving and Communications Systems (PACS) implementations become more widespread, the management of deploying large, multi-facility PACS will become a more frequent occurrence. The tools and usability of the World Wide Web to disseminate project management information obviates time, distance, participant availability, and data format constraints, allowing for the effective collection and dissemination of PACS planning, implementation information, for a potentially limitless number of concurrent PACS sites. This paper will speak to tools, such as (1) a topic specific discussion board, (2) a 'restricted' Intranet, within a 'project' Intranet. We will also discuss project specific methods currently in use in a leading edge, regional PACS implementation concerning the sharing of project schedules, physical drawings, images of implementations, site-specific data, point of contacts lists, project milestones, and a general project overview. The individual benefits realized for the end user from each tool will also be covered. These details will be presented, balanced with a spotlight on communication as a critical component of any project management undertaking. Using today's technology, the web arguably provides the most cost and resource effective vehicle to facilitate the broad based, interactive sharing of project information.

  2. Design and implementation of ergonomic performance measurement system at a steel plant in India.

    PubMed

    Ray, Pradip Kumar; Tewari, V K

    2012-01-01

    Management of Tata Steel, the largest steel making company of India in the private sector, felt the need to develop a framework to determine the levels of ergonomic performance at its different workplaces. The objectives of the study are manifold: to identify and characterize the ergonomic variables for a given worksystem with regard to work efficiency, operator safety, and working conditions, to design a comprehensive Ergonomic Performance Indicator (EPI) for quantitative determination of the ergonomic status and maturity of a given worksystem. The study team of IIT Kharagpur consists of three faculty members and the management of Tata Steel formed a team of eleven members for implementation of EPI model. In order to design and develop the EPI model with total participation and understanding of the concerned personnel of Tata Steel, a three-phase action plan for the project was prepared. The project consists of three phases: preparation and data collection, detailed structuring and validation of EPI model. Identification of ergonomic performance factors, development of interaction matrix, design of assessment tool, and testing and validation of assessment tool (EPI) in varied situations are the major steps in these phases. The case study discusses in detail the EPI model and its applications.

  3. 40 CFR 49.10042 - Approval status.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation Plan for the Cow... Tribal rules or measures in the implementation plan for the Reservation of the Cow Creek Band of Umpqua...

  4. Development of an intervention program to increase effective behaviours by patients and clinicians in psychiatric services: Intervention Mapping study.

    PubMed

    Koekkoek, Bauke; van Meijel, Berno; Schene, Aart; Hutschemaekers, Giel

    2010-10-25

    Health clinicians perceive certain patients as 'difficult' across all settings, including mental health care. In this area, patients with non-psychotic disorders that become long-term care users may be perceived as obstructing their own recovery or seeking secondary gain. This negative perception of patients results in ineffective responses and low-quality care by health clinicians. Using the concept of illness behaviour, this paper describes the development, implementation, and planned evaluation of a structured intervention aimed at prevention and management of ineffective behaviours by long-term non-psychotic patients and their treating clinicians. The principles of Intervention Mapping were applied to guide the development, implementation, and planned evaluation of the intervention. Qualitative (individual and group interviews), quantitative (survey), and mixed methods (Delphi-procedure) research was used to gain a broad perspective of the problem. Empirical findings, theoretical models, and existing evidence were combined to construct a program tailored to the needs of the target groups. A structured program to increase effective illness behaviour in long-term non-psychotic patients and effective professional behaviour in their treating clinicians was developed, consisting of three subsequent stages and four substantial components, that is described in detail. Implementation took place and evaluation of the intervention is being carried out. Intervention Mapping proved to be a suitable method to develop a structured intervention for a multi-faceted problem in mental health care.

  5. MO-F-211-01: Methods for Completing Practice Quality Improvement (PQI).

    PubMed

    Johnson, J; Brown, K; Ibbott, G; Pawlicki, T

    2012-06-01

    Practice Quality Improvement (PQI) is becoming an expected part of routine practice in healthcare as an approach to provide more efficient, effective and high quality care. Additionally, as part of the ABR's Maintenance of Certification (MOC) pathway, medical physicists are now expected to complete a PQI project. This session will describe the history behind and benefits of the ABR's MOC program, provide details of quality improvement methods and how to successfully complete a PQI project. PQI methods include various commonly used engineering and management tools. The Plan-Do-Study-Act (PDSA) cycle will be presented as one project planning and implementation tool. Other PQI analysis instruments such as flowcharts, Pareto charts, process control charts and fishbone diagrams will also be explained with examples. Cause analysis, solution development and implementation, and post-implementation measurement will be presented. Project identification and definition as well as appropriate measurement tool selection will be offered. Methods to choose key quality metrics (key quality indicators) will also be addressed. Several sample PQI projects and templates available through the AAPM and other organizations will be described. At least three examples of completed PQI projects will be shared. 1. Identify and define a PQI project 2. Identify and select measurement methods/techniques for use with the PQI project 3. Describe example(s) of completed projects. © 2012 American Association of Physicists in Medicine.

  6. 77 FR 60661 - Approval and Promulgation of Air Quality Implementation Plans; Indiana; South Bend-Elkhart...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-04

    ... Promulgation of Air Quality Implementation Plans; Indiana; South Bend-Elkhart, Indiana Ozone Maintenance Plan..., Indiana 1997 8-hour ozone maintenance air quality State Implementation Plan (SIP) by replacing the... Vehicle Emissions Simulator (MOVES) 2010a emissions model. Indiana submitted this request to EPA for...

  7. 77 FR 59356 - Approval and Promulgation of Implementation Plans; North Carolina: Approval of Rocky Mount...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-27

    ... Promulgation of Implementation Plans; North Carolina: Approval of Rocky Mount Supplemental Motor Vehicle... is proposing to approve a revision to the North Carolina State Implementation Plan (SIP), submitted... supplements the original redesignation request and maintenance plan for Rocky Mount 1997 8-hour ozone area...

  8. 77 FR 30212 - Approval and Promulgation of Air Quality Implementation Plans; Vermont; Regional Haze

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-22

    ... Promulgation of Air Quality Implementation Plans; Vermont; Regional Haze AGENCY: Environmental Protection... Implementation Plan (SIP) that addresses regional haze for the first planning period from 2008 through 2018. The... numerous sources located over a wide geographic area (also referred to as the ``regional haze program...

  9. 77 FR 47530 - Approval and Promulgation of State Implementation Plans; Hawaii; Infrastructure Requirements for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-09

    ... Promulgation of State Implementation Plans; Hawaii; Infrastructure Requirements for the 1997 8-Hour Ozone and... State Implementation Plan (SIP) revision submitted by the state of Hawaii pursuant to the requirements... FURTHER INFORMATION CONTACT: Dawn Richmond, Air Planning Office (AIR-2), U.S. Environmental Protection...

  10. Design and implementation of a beam-waveguide mirror control system for vernier pointing of the DSS-13 antenna

    NASA Technical Reports Server (NTRS)

    Alvarez, L. S.; Moore, M.; Veruttipong, W.; Andres, E.

    1994-01-01

    The design and implementation of an antenna beam-waveguide (BWG) mirror position control system at the DSS-13 34-m antenna is presented. While it has several potential applications, a positioner on the last flat-plate BWG mirror (M6) at DSS 13 is installed to demonstrate the conical scan (conscan) angle-tracking technique at the Ka-band (32-GHz) operating frequency. Radio frequency (RF) beam-scanning predictions for the M6 mirror, computed from a diffraction analysis, are presented. From these predictions, position control system requirements are then derived. The final mechanical positioner and servo system designs, as implemented at DSS 13, are illustrated with detailed design descriptions given in the appendices. Preliminary measurements of antenna Ka-band beam scan versus M6 mirror tilt made at DSS 13 in December 1993 are presented. After reduction, the initial measurements are shown to be in agreement with the RF predicts. Plans for preliminary conscan experimentation at DSS 13 are summarized.

  11. Exploration Requirements Development Utilizing the Strategy-to-Task-to-Technology Development Approach

    NASA Technical Reports Server (NTRS)

    Drake, Bret G.; Josten, B. Kent; Monell, Donald W.

    2004-01-01

    The Vision for Space Exploration provides direction for the National Aeronautics and Space Administration to embark on a robust space exploration program that will advance the Nation s scientific, security, and economic interests. This plan calls for a progressive expansion of human capabilities beyond low earth orbit seeking to answer profound scientific and philosophical questions while responding to discoveries along the way. In addition, the Vision articulates the strategy for developing the revolutionary new technologies and capabilities required for the future exploration of the solar system. The National Aeronautics and Space Administration faces new challenges in successfully implementing the Vision. In order to implement a sustained and affordable exploration endeavor it is vital for NASA to do business differently. This paper provides an overview of the strategy-to-task-to-technology process being used by NASA s Exploration Systems Mission Directorate to develop the requirements and system acquisition details necessary for implementing a sustainable exploration vision.

  12. Orbiter data reduction complex data processing requirements for the OFT mission evaluation team (level C)

    NASA Technical Reports Server (NTRS)

    1979-01-01

    This document addresses requirements for post-test data reduction in support of the Orbital Flight Tests (OFT) mission evaluation team, specifically those which are planned to be implemented in the ODRC (Orbiter Data Reduction Complex). Only those requirements which have been previously baselined by the Data Systems and Analysis Directorate configuration control board are included. This document serves as the control document between Institutional Data Systems Division and the Integration Division for OFT mission evaluation data processing requirements, and shall be the basis for detailed design of ODRC data processing systems.

  13. Studies in knowledge-based diagnosis of failures in robotic assembly

    NASA Technical Reports Server (NTRS)

    Lam, Raymond K.; Pollard, Nancy S.; Desai, Rajiv S.

    1990-01-01

    The telerobot diagnostic system (TDS) is a knowledge-based system that is being developed for identification and diagnosis of failures in the space robotic domain. The system is able to isolate the symptoms of the failure, generate failure hypotheses based on these symptoms, and test their validity at various levels by interpreting or simulating the effects of the hypotheses on results of plan execution. The implementation of the TDS is outlined. The classification of failures and the types of system models used by the TDS are discussed. A detailed example of the TDS approach to failure diagnosis is provided.

  14. Deep space network software cost estimation model

    NASA Technical Reports Server (NTRS)

    Tausworthe, R. C.

    1981-01-01

    A parametric software cost estimation model prepared for Deep Space Network (DSN) Data Systems implementation tasks is presented. The resource estimation model incorporates principles and data from a number of existing models. The model calibrates task magnitude and difficulty, development environment, and software technology effects through prompted responses to a set of approximately 50 questions. Parameters in the model are adjusted to fit DSN software life cycle statistics. The estimation model output scales a standard DSN Work Breakdown Structure skeleton, which is then input into a PERT/CPM system, producing a detailed schedule and resource budget for the project being planned.

  15. Declarative Business Process Modelling and the Generation of ERP Systems

    NASA Astrophysics Data System (ADS)

    Schultz-Møller, Nicholas Poul; Hølmer, Christian; Hansen, Michael R.

    We present an approach to the construction of Enterprise Resource Planning (ERP) Systems, which is based on the Resources, Events and Agents (REA) ontology. This framework deals with processes involving exchange and flow of resources in a declarative, graphically-based manner describing what the major entities are rather than how they engage in computations. We show how to develop a domain-specific language on the basis of REA, and a tool which automatically can generate running web-applications. A main contribution is a proof-of-concept showing that business-domain experts can generate their own applications without worrying about implementation details.

  16. E-Nursing: electronic nursing resources on your desktop.

    PubMed

    Kendall, Sandra; Massaralla, Susan; Hynes-Gay, Patricia; Vincent, Leslie

    2003-01-01

    E-Nursing represents an innovative approach to nursing education that has the potential to support professional practice throughout the institution. This paper details the benefits, design and promotion of an electronic nursing resource collection. How to divide responsibility, cost and expertise in such a project is also discussed. Preliminary usage statistics validate E-Nursing as a point-of-care education tool for nurses at Mount Sinai Hospital. A planned approach to implementation has been an effective means of introducing E-Nursing in an institution that previously relied on traditional hard-copy resources housed in the hospital's library.

  17. A multi-agent architecture for geosimulation of moving agents

    NASA Astrophysics Data System (ADS)

    Vahidnia, Mohammad H.; Alesheikh, Ali A.; Alavipanah, Seyed Kazem

    2015-10-01

    In this paper, a novel architecture is proposed in which an axiomatic derivation system in the form of first-order logic facilitates declarative explanation and spatial reasoning. Simulation of environmental perception and interaction between autonomous agents is designed with a geographic belief-desire-intention and a request-inform-query model. The architecture has a complementary quantitative component that supports collaborative planning based on the concept of equilibrium and game theory. This new architecture presents a departure from current best practices geographic agent-based modelling. Implementation tasks are discussed in some detail, as well as scenarios for fleet management and disaster management.

  18. Hazards in the hospital.

    PubMed

    Seibert, P J

    1994-02-01

    In an earlier article (JAVMA, Jan 15, 1994), the author outlined some of the first steps necessary in establishing a hospital safety program that will comply with current Occupational Safety and Health Administration (OSHA) guidelines. One of the main concerns of the OSHA guidelines is that there be written plans for managing hazardous materials, performing dangerous jobs, and dealing with other potential safety problems. In this article, the author discusses potentially hazardous situations commonly found in veterinary practices and provides details on how to minimize the risks associated with those situations and how to implement safety procedures that will comply with the OSHA guidelines.

  19. 27. Photographic copy of Mezzanine Plan, Roof Plan and Details ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    27. Photographic copy of Mezzanine Plan, Roof Plan and Details (The Ballinger Company, April 12, 1955). In files of the City of Philadelphia, Division of Aviation, Terminal E, Philadelphia International Airport. Reprinted with permission of the Division of Aviation. - TWA Maintenance Hangar, South side of Tinicum Island Road, Philadelphia International Airport, Philadelphia, Philadelphia County, PA

  20. 3. PHOTOGRAPHIC COPY OF MASTER PLAN, DETAIL SITE PLAN, 7TH ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    3. PHOTOGRAPHIC COPY OF MASTER PLAN, DETAIL SITE PLAN, 7TH CAVALRY BUILDINGS, DATED SEPTEMBER 10, 1951, SEE ARROW, DRAWING # BM-036, COPY ON FILE IN THE ENVIRONMENTAL MANAGEMENT OFFICE, FORT BLISS - Fort Bliss, 7th Cavalry Buildings, U.S. Army Air Defence Artillery Center & Fort Bliss, El Paso, El Paso County, TX

  1. 37. ELECTRICAL PLAN AND DETAILS. SHOWS PLANNED LOCATION OF PORTABLE ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    37. ELECTRICAL PLAN AND DETAILS. SHOWS PLANNED LOCATION OF PORTABLE GENERATOR. FUNCTION OF FOUR-FOOT SQUARE PIT IS SHOWN AS 'D.C. POWER SUPPLY PIT.' F.C. TORKELSON DRAWING NUMBER 842-ARVFS-701-E-1. INEL INDEX CODE NUMBER: 075 0701 10 851 151973. - Idaho National Engineering Laboratory, Advanced Reentry Vehicle Fusing System, Scoville, Butte County, ID

  2. The work practice of medical secretaries and the implementation of electronic health records in Denmark.

    PubMed

    Bertelsen, Pernille; Nøhr, Christian

    The introduction of electronic health records will entail substantial organisational changes to the clinical and administrative staff in hospitals. Hospital owners in Denmark have predicted that these changes will render up to half of medical secretaries redundant. The present study however shows that medical secretaries have a great variety of duties, and often act as the organisational "glue" or connecting thread between other professional groups at the hospital. The aim of this study is to obtain a detailed understanding of the pluralism of work tasks the medical secretaries perform. It is concluded that clinicians as well as nurses depend on medical secretaries, and therefore to reduce the number of secretaries because electronic health record systems are implemented needs very careful thinking, planning and discussion with the other professions involved.

  3. The need for speed: informed land acquisitions for conservation in a dynamic property market.

    PubMed

    McDonald-Madden, Eve; Bode, Michael; Game, Edward T; Grantham, Hedley; Possingham, Hugh P

    2008-11-01

    Land acquisition is a common approach to biodiversity conservation but is typically subject to property availability on the public market. Consequently, conservation plans are often unable to be implemented as intended. When properties come on the market, conservation agencies must make a choice: purchase immediately, often without a detailed knowledge of its biodiversity value; survey the parcel and accept the risk that it may be removed from the market during this process; or not purchase and hope a better parcel comes on the market at a later date. We describe both an optimal method, using stochastic dynamic programming, and a simple rule of thumb for making such decisions. The solutions to this problem illustrate how optimal conservation is necessarily dynamic and requires explicit consideration of both the time period allowed for implementation and the availability of properties.

  4. Saugus River and Tributaries Flood Damage Reduction Study: Lynn, Malden, Revere and Saugus, Massachusetts. Section 1. Feasibility Report.

    DTIC Science & Technology

    1989-12-01

    57 Table 5 Sensitivity Analysis - Point of Pines LPP 61 Table 6 Plan Comparison 64 Table 7 NED Plan Project Costs 96 Table 8 Estimated Operation...Costs 99 Table 13 Selected Plan/Estimated Annual Benefits 101 Table 14 Comparative Impacts - NED Regional Floodgate Plan 102 Table 15 Economic Analysis ...Includes detailed descriptions, plans and profiles and design considerations of the selected plan; coastal analysis of the shorefront; detailed project

  5. Implementing the United Kingdom Government's 10-Year Teenage Pregnancy Strategy for England (1999-2010): Applicable Lessons for Other Countries.

    PubMed

    Hadley, Alison; Chandra-Mouli, Venkatraman; Ingham, Roger

    2016-07-01

    Teenage pregnancy is an issue of inequality affecting the health, well-being, and life chances of young women, young men, and their children. Consequently, high levels of teenage pregnancy are of concern to an increasing number of developing and developed countries. The UK Labour Government's Teenage Pregnancy Strategy for England was one of the very few examples of a nationally led, locally implemented evidence-based strategy, resourced over a long duration, with an associated reduction of 51% in the under-18 conception rate. This article seeks to identify the lessons applicable to other countries. The article focuses on the prevention program. Drawing on the detailed documentation of the 10-year strategy, it analyzes the factors that helped and hindered implementation against the World Health Organization (WHO) ExpandNet Framework. The Framework strives to improve the planning and management of the process of scaling-up of successful pilot programs with a focus on sexual and reproductive health, making it particularly suited for an analysis of England's teenage pregnancy strategy. The development and implementation of the strategy matches the Framework's key attributes for successful planning and scaling up of sexual and reproductive health programs. It also matched the attributes identified by the Centre for Global Development for scaled up approaches to complex public health issues. Although the strategy was implemented in a high-income country, analysis against the WHO-ExpandNet Framework identifies many lessons which are transferable to low- and medium-income countries seeking to address high teenage pregnancy rates. Copyright © 2016 Society for Adolescent Health and Medicine. Published by Elsevier Inc. All rights reserved.

  6. Reconfigurable Software for Controlling Formation Flying

    NASA Technical Reports Server (NTRS)

    Mueller, Joseph B.

    2006-01-01

    Software for a system to control the trajectories of multiple spacecraft flying in formation is being developed to reflect underlying concepts of (1) a decentralized approach to guidance and control and (2) reconfigurability of the control system, including reconfigurability of the software and of control laws. The software is organized as a modular network of software tasks. The computational load for both determining relative trajectories and planning maneuvers is shared equally among all spacecraft in a cluster. The flexibility and robustness of the software are apparent in the fact that tasks can be added, removed, or replaced during flight. In a computational simulation of a representative formation-flying scenario, it was demonstrated that the following are among the services performed by the software: Uploading of commands from a ground station and distribution of the commands among the spacecraft, Autonomous initiation and reconfiguration of formations, Autonomous formation of teams through negotiations among the spacecraft, Working out details of high-level commands (e.g., shapes and sizes of geometrically complex formations), Implementation of a distributed guidance law providing autonomous optimization and assignment of target states, and Implementation of a decentralized, fuel-optimal, impulsive control law for planning maneuvers.

  7. Planning Targets for Phase II Watershed Implementation Plans

    EPA Pesticide Factsheets

    On August 1, 2011, EPA provided planning targets for nitrogen, phosphorus and sediment for the Phase II Watershed Implementation Plans (WIPs) of the Chesapeake Bay TMDL. This page provides the letters containing those planning targets.

  8. Antimicrobial resistance in South East Asia: time to ask the right questions.

    PubMed

    Kakkar, Manish; Chatterjee, Pranab; Chauhan, Abhimanyu Singh; Grace, Delia; Lindahl, Johanna; Beeche, Arlyne; Jing, Fang; Chotinan, Suwit

    2018-01-01

    Antimicrobial resistance (AMR) has emerged as a major public health concern, around which the international leadership has come together to form strategic partnerships and action plans. The main driving force behind the emergence of AMR is selection pressure created due to consumption of antibiotics. Consumption of antibiotics in human as well as animal sectors are driven by a complex interplay of determinants, many of which are typical to the local settings. Several sensitive and essential realities are tied with antibiotic consumption - food security, livelihoods, poverty alleviation, healthcare access and national economies, to name a few. That makes one-size-fits-all policies, framed with the developed country context in mind, inappropriate for developing countries. Many countries in the South East Asian Region have some policy structures in place to deal with AMR, but most of them lack detailed implementation plans or monitoring structures. In this current debates piece, the authors argue that the principles driving the AMR agenda in the South East Asian countries need to be dealt with using locally relevant policy structures. Strategies, which have successfully reduced the burden of AMR in the developed countries, should be evaluated in the developing country contexts instead of ad hoc implementation. The Global Action Plan on AMR encourages member states to develop locally relevant National Action Plans on AMR. This policy position should be leveraged to develop and deploy locally relevant strategies, which are based on a situation analysis of the local systems, and are likely to meet the needs of the individual member states.

  9. Methods of Genomic Competency Integration in Practice

    PubMed Central

    Jenkins, Jean; Calzone, Kathleen A.; Caskey, Sarah; Culp, Stacey; Weiner, Marsha; Badzek, Laurie

    2015-01-01

    Purpose Genomics is increasingly relevant to health care, necessitating support for nurses to incorporate genomic competencies into practice. The primary aim of this project was to develop, implement, and evaluate a year-long genomic education intervention that trained, supported, and supervised institutional administrator and educator champion dyads to increase nursing capacity to integrate genomics through assessments of program satisfaction and institutional achieved outcomes. Design Longitudinal study of 23 Magnet Recognition Program® Hospitals (21 intervention, 2 controls) participating in a 1-year new competency integration effort aimed at increasing genomic nursing competency and overcoming barriers to genomics integration in practice. Methods Champion dyads underwent genomic training consisting of one in-person kick-off training meeting followed by monthly education webinars. Champion dyads designed institution-specific action plans detailing objectives, methods or strategies used to engage and educate nursing staff, timeline for implementation, and outcomes achieved. Action plans focused on a minimum of seven genomic priority areas: champion dyad personal development; practice assessment; policy content assessment; staff knowledge needs assessment; staff development; plans for integration; and anticipated obstacles and challenges. Action plans were updated quarterly, outlining progress made as well as inclusion of new methods or strategies. Progress was validated through virtual site visits with the champion dyads and chief nursing officers. Descriptive data were collected on all strategies or methods utilized, and timeline for achievement. Descriptive data were analyzed using content analysis. Findings The complexity of the competency content and the uniqueness of social systems and infrastructure resulted in a significant variation of champion dyad interventions. Conclusions Nursing champions can facilitate change in genomic nursing capacity through varied strategies but require substantial training in order to design and implement interventions. Clinical Relevance Genomics is critical to the practice of all nurses. There is a great opportunity and interest to address genomic knowledge deficits in the practicing nurse workforce as a strategy to improve patient outcomes. Exemplars of champion dyad interventions designed to increase nursing capacity focus on improving education, policy, and healthcare services. PMID:25808828

  10. Facilities Utilization Program Implementation Handbook

    NASA Technical Reports Server (NTRS)

    1987-01-01

    This Facilities Utilization Program Implementation Handbook (FUPIH) prescribes procedures for the review and the reporting on the utilization of NASA facilities. The Directors of NASA Field Installations should designate an Installation Official responsible for coordinating the assignment of buildings space and implementing the facilities utilization reviews and annual report preparation. The individual designated shall be known as the 'Facilities Utilization Officer (FUO).' Functional responsibilities of the FUO are detailed in NASA Management Instruction (NMI) 7234.1. It is recognized that titles used in the implementation of the Facilities Utilization Program may vary between field installations. The Facilities Utilization Program (FUP) is designed to provide a uniform and orderly process for meeting or addressing the following objectives: the establishment of sound facilities requirements to meet NASA's programmatic and institutional needs; the optimum allocation of available facilities and related resources to meet these requirements; and the early identification and request for required additional facilities resources. The detailed review and reporting system enacted by NMI 7234.1 should encourage more comprehensive utilization planning for all NASA facilities and ensure, to the maximum extent practicable, that all such facilities are put to their highest and best use consistent with NASA programmatic and institutional priorities. A principal purpose of the FUP is the early identification of NASA facilities which may be or may become underutilized or excess to NASA needs and to provide a timely reference point from which corrective actions (i.e., consolidation, elimination of duplication, improved utilization of disposal) may be taken. Because the supply of this handbook is limited, distribution should be controlled at the field installation level.

  11. 50. Photograph of an original construction drawing, dated August 1927, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    50. Photograph of an original construction drawing, dated August 1927, in the possession of Facilities Planning Office, Iowa State University, Ames, Iowa. EXTERIOR DETAILS DETAIL ELEVATION, PLAN, AND WALL CROSS SECTION AT FRONT ENTRANCE PORTICO; EXTERIOR WALL AND OPENING DETAILS; AND OTHER EXTERIOR DETAILS; SHEET NO. 8 OF 10 - Dairy Industry Building, Iowa State University campus, Ames, Story County, IA

  12. Building robust conservation plans.

    PubMed

    Visconti, Piero; Joppa, Lucas

    2015-04-01

    Systematic conservation planning optimizes trade-offs between biodiversity conservation and human activities by accounting for socioeconomic costs while aiming to achieve prescribed conservation objectives. However, the most cost-efficient conservation plan can be very dissimilar to any other plan achieving the set of conservation objectives. This is problematic under conditions of implementation uncertainty (e.g., if all or part of the plan becomes unattainable). We determined through simulations of parallel implementation of conservation plans and habitat loss the conditions under which optimal plans have limited chances of implementation and where implementation attempts would fail to meet objectives. We then devised a new, flexible method for identifying conservation priorities and scheduling conservation actions. This method entails generating a number of alternative plans, calculating the similarity in site composition among all plans, and selecting the plan with the highest density of neighboring plans in similarity space. We compared our method with the classic method that maximizes cost efficiency with synthetic and real data sets. When implementation was uncertain--a common reality--our method provided higher likelihood of achieving conservation targets. We found that χ, a measure of the shortfall in objectives achieved by a conservation plan if the plan could not be implemented entirely, was the main factor determining the relative performance of a flexibility enhanced approach to conservation prioritization. Our findings should help planning authorities prioritize conservation efforts in the face of uncertainty about future condition and availability of sites. © 2014 Society for Conservation Biology.

  13. 76 FR 15 - Approval and Promulgation of Implementation Plans; Texas; Emissions Banking and Trading of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-03

    ... Promulgation of Implementation Plans; Texas; Emissions Banking and Trading of Allowances Program AGENCY... to the Texas State Implementation Plan (SIP) that create and amend the Emissions Banking and Trading... hard copy at the Air Planning Section (6PD-L), Environmental Protection Agency, 1445 Ross Avenue, Suite...

  14. 78 FR 33784 - Approval and Promulgation of Implementation Plans; Kentucky: Kentucky Portion of Cincinnati...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-05

    ... Promulgation of Implementation Plans; Kentucky: Kentucky Portion of Cincinnati-Hamilton, Supplement Motor.... SUMMARY: EPA is proposing to approve a revision to the Kentucky State Implementation Plan (SIP), submitted... maintenance plan for the Kentucky portion of the Cincinnati-Hamilton, OH-KY-IN, maintenance area for the 1997...

  15. 78 FR 34903 - Approval and Promulgation of Air Quality Implementation Plans; Ohio; 1997 8-Hour Ozone...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-11

    ... Promulgation of Air Quality Implementation Plans; Ohio; 1997 8-Hour Ozone Maintenance Plan Revision; Motor... request by Ohio to revise the 1997 8-hour ozone maintenance air quality State Implementation Plan (SIP) to... area with budgets developed using EPA's Motor Vehicle Emissions Simulator (MOVES) emissions model. Ohio...

  16. 78 FR 16826 - Approval and Promulgation of Air Quality Implementation Plans; Ohio; Cleveland-Akron-Lorain and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-19

    ...-9790-1] Approval and Promulgation of Air Quality Implementation Plans; Ohio; Cleveland-Akron-Lorain and Columbus 1997 8-Hour Ozone Maintenance Plan Revisions to Approved Motor Vehicle Emissions Budgets AGENCY... quality State Implementation Plans (SIPs) under the Clean Air Act to replace the previously approved motor...

  17. 78 FR 28497 - Approval and Promulgation of Air Quality Implementation Plans; Ohio; Canton-Massillon 1997 8-Hour...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-15

    ... Promulgation of Air Quality Implementation Plans; Ohio; Canton-Massillon 1997 8-Hour Ozone Maintenance Plan... the Canton-Massillon, Ohio 1997 8-hour ozone maintenance air quality State Implementation Plan (SIP... using EPA's Motor Vehicle Emissions Simulator (MOVES) emissions model. Ohio submitted the SIP revision...

  18. 78 FR 28551 - Approval and Promulgation of Air Quality Implementation Plans; Ohio; Canton-Massillon 1997 8-Hour...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-15

    ... Promulgation of Air Quality Implementation Plans; Ohio; Canton-Massillon 1997 8-Hour Ozone Maintenance Plan..., Ohio, 1997 8-hour ozone maintenance air quality State Implementation Plan (SIP) under the Clean Air Act... Motor Vehicle Emissions Simulator (MOVES) emissions model. Ohio submitted the SIP revision request to...

  19. 77 FR 30214 - Approval and Promulgation of Air Quality Implementation Plans; Rhode Island; Regional Haze

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-22

    ... Promulgation of Air Quality Implementation Plans; Rhode Island; Regional Haze AGENCY: Environmental Protection... Implementation Plan (SIP) that addresses regional haze for the first planning period from 2008 through 2018. The... geographic area (also referred to as the ``regional haze program''). DATES: Effective Date: This rule is...

  20. 76 FR 43149 - Approval and Promulgation of Air Quality Implementation Plans; State of California; Regional Haze...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-20

    ... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 [EPA-R09-OAR-2011-0131, FRL-9317-9] Approval and Promulgation of Air Quality Implementation Plans; State of California; Regional Haze State Implementation Plan and Interstate Transport Plan; Interference With Visibility Requirement Correction In rule document...

Top