Sample records for develop mitigation plans

  1. 44 CFR 78.5 - Flood Mitigation Plan development.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 44 Emergency Management and Assistance 1 2011-10-01 2011-10-01 false Flood Mitigation Plan development. 78.5 Section 78.5 Emergency Management and Assistance FEDERAL EMERGENCY MANAGEMENT AGENCY... MITIGATION ASSISTANCE § 78.5 Flood Mitigation Plan development. A Flood Mitigation Plan will articulate a...

  2. 44 CFR 78.5 - Flood Mitigation Plan development.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 44 Emergency Management and Assistance 1 2010-10-01 2010-10-01 false Flood Mitigation Plan development. 78.5 Section 78.5 Emergency Management and Assistance FEDERAL EMERGENCY MANAGEMENT AGENCY... MITIGATION ASSISTANCE § 78.5 Flood Mitigation Plan development. A Flood Mitigation Plan will articulate a...

  3. 44 CFR 78.5 - Flood Mitigation Plan development.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 44 Emergency Management and Assistance 1 2012-10-01 2011-10-01 true Flood Mitigation Plan..., DEPARTMENT OF HOMELAND SECURITY INSURANCE AND HAZARD MITIGATION National Flood Insurance Program FLOOD MITIGATION ASSISTANCE § 78.5 Flood Mitigation Plan development. A Flood Mitigation Plan will articulate a...

  4. 44 CFR 78.5 - Flood Mitigation Plan development.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 44 Emergency Management and Assistance 1 2013-10-01 2013-10-01 false Flood Mitigation Plan..., DEPARTMENT OF HOMELAND SECURITY INSURANCE AND HAZARD MITIGATION National Flood Insurance Program FLOOD MITIGATION ASSISTANCE § 78.5 Flood Mitigation Plan development. A Flood Mitigation Plan will articulate a...

  5. 44 CFR 78.5 - Flood Mitigation Plan development.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 44 Emergency Management and Assistance 1 2014-10-01 2014-10-01 false Flood Mitigation Plan..., DEPARTMENT OF HOMELAND SECURITY INSURANCE AND HAZARD MITIGATION National Flood Insurance Program FLOOD MITIGATION ASSISTANCE § 78.5 Flood Mitigation Plan development. A Flood Mitigation Plan will articulate a...

  6. A public health hazard mitigation planning process.

    PubMed

    Griffith, Jennifer M; Kay Carpender, S; Crouch, Jill Artzberger; Quiram, Barbara J

    2014-01-01

    The Texas A&M Health Science Center School of Rural Public Health, a member of the Training and Education Collaborative System Preparedness and Emergency Response Learning Center (TECS-PERLC), has long-standing partnerships with 2 Health Service Regions (Regions) in Texas. TECS-PERLC was contracted by these Regions to address 2 challenges identified in meeting requirements outlined by the Risk-Based Funding Project. First, within Metropolitan Statistical Areas, there is not a formal authoritative structure. Second, preexisting tools and processes did not adequately satisfy requirements to assess public health, medical, and mental health needs and link mitigation strategies to the Public Health Preparedness Capabilities, which provide guidance to prepare for, respond to, and recover from public health incidents. TECS-PERLC, with its partners, developed a framework to interpret and apply results from the Texas Public Health Risk Assessment Tool (TxPHRAT). The 3-phase community engagement-based TxPHRAT Mitigation Planning Process (Mitigation Planning Process) and associated tools facilitated the development of mitigation plans. Tools included (1) profiles interpreting TxPHRAT results and identifying, ranking, and prioritizing hazards and capability gaps; (2) a catalog of intervention strategies and activities linked to hazards and capabilities; and (3) a template to plan, evaluate, and report mitigation planning efforts. The Mitigation Planning Process provided a framework for Regions to successfully address all funding requirements. TECS-PERLC developed more than 60 profiles, cataloged and linked 195 intervention strategies, and developed a template resulting in 20 submitted mitigation plans. A public health-focused, community engagement-based mitigation planning process was developed by TECS-PERLC and successfully implemented by the Regions. The outcomes met all requirements and reinforce the effectiveness of academic practice partnerships and importance of community engagement in mitigation planning. Additional funding has been approved to expand the Mitigation Planning Process to all counties in Texas with local health departments.

  7. 44 CFR 79.6 - Eligibility.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... SECURITY INSURANCE AND HAZARD MITIGATION National Flood Insurance Program FLOOD MITIGATION GRANTS § 79.6... develop or update the flood portion of any mitigation plan. Planning grants are not eligible for funding... requirement. (1) States must have an approved State Mitigation Plan meeting the requirements of §§ 201.4 or...

  8. 44 CFR 79.6 - Eligibility.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... SECURITY INSURANCE AND HAZARD MITIGATION National Flood Insurance Program FLOOD MITIGATION GRANTS § 79.6... develop or update the flood portion of any mitigation plan. Planning grants are not eligible for funding... requirement. (1) States must have an approved State Mitigation Plan meeting the requirements of §§ 201.4 or...

  9. 44 CFR 79.6 - Eligibility.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... SECURITY INSURANCE AND HAZARD MITIGATION National Flood Insurance Program FLOOD MITIGATION GRANTS § 79.6... develop or update the flood portion of any mitigation plan. Planning grants are not eligible for funding... requirement. (1) States must have an approved State Mitigation Plan meeting the requirements of §§ 201.4 or...

  10. 44 CFR 79.6 - Eligibility.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... INSURANCE AND HAZARD MITIGATION National Flood Insurance Program FLOOD MITIGATION GRANTS § 79.6 Eligibility... develop or update the flood portion of any mitigation plan. Planning grants are not eligible for funding... requirement. (1) States must have an approved State Mitigation Plan meeting the requirements of §§ 201.4 or...

  11. Development by Design in Colombia: Making Mitigation Decisions Consistent with Conservation Outcomes

    PubMed Central

    Saenz, Shirley; Walschburger, Tomas; González, Juan Carlos; León, Jorge; McKenney, Bruce; Kiesecker, Joseph

    2013-01-01

    Mitigation policy and regulatory frameworks are consistent in their strong support for the mitigation hierarchy of: (1) avoiding impacts, (2) minimizing impacts, and then (3) offsetting/compensating for residual impacts. While mitigation frameworks require developers to avoid, minimize and restore biodiversity on-site before considering an offset for residual impacts, there is a lack of quantitative guidance for this decision-making process. What are the criteria for requiring impacts be avoided altogether? Here we examine how conservation planning can guide the application of the mitigation hierarchy to address this issue. In support of the Colombian government's aim to improve siting and mitigation practices for planned development, we examined five pilot projects in landscapes expected to experience significant increases in mining, petroleum and/or infrastructure development. By blending landscape-level conservation planning with application of the mitigation hierarchy, we can proactively identify where proposed development and conservation priorities would be in conflict and where impacts should be avoided. The approach we outline here has been adopted by the Colombian Ministry of Environment and Sustainable Development to guide licensing decisions, avoid piecemeal licensing, and promote mitigation decisions that maintain landscape condition. PMID:24339972

  12. Development by design in Colombia: making mitigation decisions consistent with conservation outcomes.

    PubMed

    Saenz, Shirley; Walschburger, Tomas; González, Juan Carlos; León, Jorge; McKenney, Bruce; Kiesecker, Joseph

    2013-01-01

    Mitigation policy and regulatory frameworks are consistent in their strong support for the mitigation hierarchy of: (1) avoiding impacts, (2) minimizing impacts, and then (3) offsetting/compensating for residual impacts. While mitigation frameworks require developers to avoid, minimize and restore biodiversity on-site before considering an offset for residual impacts, there is a lack of quantitative guidance for this decision-making process. What are the criteria for requiring impacts be avoided altogether? Here we examine how conservation planning can guide the application of the mitigation hierarchy to address this issue. In support of the Colombian government's aim to improve siting and mitigation practices for planned development, we examined five pilot projects in landscapes expected to experience significant increases in mining, petroleum and/or infrastructure development. By blending landscape-level conservation planning with application of the mitigation hierarchy, we can proactively identify where proposed development and conservation priorities would be in conflict and where impacts should be avoided. The approach we outline here has been adopted by the Colombian Ministry of Environment and Sustainable Development to guide licensing decisions, avoid piecemeal licensing, and promote mitigation decisions that maintain landscape condition.

  13. 44 CFR 201.7 - Tribal Mitigation Plans.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... mitigation activities, and agencies that have the authority to regulate development, as well as businesses...; (C) A general description of land uses and development trends within the tribal planning area so that...

  14. Mitigating Community Impacts of Energy Development: Some Examples for Coal and Nuclear Generating Plants in the United States.

    ERIC Educational Resources Information Center

    Peelle, Elizabeth

    The Hartsville, Tennessee nuclear reactor site, the coal plant at Wheatland, Wyoming, and the nuclear plant at Skagit, Washington have mitigation plans developed in response to a federal, state, and local regulatory agency, respectively; the three mitigation plans aim at internalizing community-level social costs and benefits during the…

  15. Trading places - an innovative SO{sub 2} trading program to mitigate potential adverse impacts on class I areas: part II. Mitigation plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Louis Militana; Cindy Huber; Christopher Colbert

    2005-08-01

    This is the second of two articles describing a plan that was developed to mitigate the effects of acid deposition and visibility impairment in four Class I areas from the proposed Longview Power Project. Part I (published in July 2005) discussed the air quality impacts of the proposed coal-fired power plant. Part II discusses the mitigation plan. 2 refs., 1 fig., 3 tabs.

  16. 43 CFR 10005.16 - Plan content.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 43 Public Lands: Interior 2 2014-10-01 2014-10-01 false Plan content. 10005.16 Section 10005.16 Public Lands: Interior Regulations Relating to Public Lands (Continued) UTAH RECLAMATION MITIGATION AND CONSERVATION COMMISSION POLICIES AND PROCEDURES FOR DEVELOPING AND IMPLEMENTING THE COMMISSION'S MITIGATION AND CONSERVATION PLAN § 10005.16 Plan...

  17. 43 CFR 10005.16 - Plan content.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 43 Public Lands: Interior 2 2012-10-01 2012-10-01 false Plan content. 10005.16 Section 10005.16 Public Lands: Interior Regulations Relating to Public Lands (Continued) UTAH RECLAMATION MITIGATION AND CONSERVATION COMMISSION POLICIES AND PROCEDURES FOR DEVELOPING AND IMPLEMENTING THE COMMISSION'S MITIGATION AND CONSERVATION PLAN § 10005.16 Plan...

  18. 43 CFR 10005.16 - Plan content.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 43 Public Lands: Interior 2 2013-10-01 2013-10-01 false Plan content. 10005.16 Section 10005.16 Public Lands: Interior Regulations Relating to Public Lands (Continued) UTAH RECLAMATION MITIGATION AND CONSERVATION COMMISSION POLICIES AND PROCEDURES FOR DEVELOPING AND IMPLEMENTING THE COMMISSION'S MITIGATION AND CONSERVATION PLAN § 10005.16 Plan...

  19. 43 CFR 10005.16 - Plan content.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 43 Public Lands: Interior 2 2011-10-01 2011-10-01 false Plan content. 10005.16 Section 10005.16 Public Lands: Interior Regulations Relating to Public Lands (Continued) UTAH RECLAMATION MITIGATION AND CONSERVATION COMMISSION POLICIES AND PROCEDURES FOR DEVELOPING AND IMPLEMENTING THE COMMISSION'S MITIGATION AND CONSERVATION PLAN § 10005.16 Plan...

  20. 15 CFR 970.702 - Monitoring and mitigation of environmental effects.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 15 Commerce and Foreign Trade 3 2012-01-01 2012-01-01 false Monitoring and mitigation of... Environmental Effects § 970.702 Monitoring and mitigation of environmental effects. (a) Monitoring. If an... monitoring plan as part of the terms, conditions and restrictions developed for each license. The plan will...

  1. 15 CFR 970.702 - Monitoring and mitigation of environmental effects.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 15 Commerce and Foreign Trade 3 2014-01-01 2014-01-01 false Monitoring and mitigation of... Environmental Effects § 970.702 Monitoring and mitigation of environmental effects. (a) Monitoring. If an... monitoring plan as part of the terms, conditions and restrictions developed for each license. The plan will...

  2. 15 CFR 970.702 - Monitoring and mitigation of environmental effects.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 15 Commerce and Foreign Trade 3 2011-01-01 2011-01-01 false Monitoring and mitigation of... Environmental Effects § 970.702 Monitoring and mitigation of environmental effects. (a) Monitoring. If an... monitoring plan as part of the terms, conditions and restrictions developed for each license. The plan will...

  3. 15 CFR 970.702 - Monitoring and mitigation of environmental effects.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 15 Commerce and Foreign Trade 3 2013-01-01 2013-01-01 false Monitoring and mitigation of... Environmental Effects § 970.702 Monitoring and mitigation of environmental effects. (a) Monitoring. If an... monitoring plan as part of the terms, conditions and restrictions developed for each license. The plan will...

  4. 15 CFR 970.702 - Monitoring and mitigation of environmental effects.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 15 Commerce and Foreign Trade 3 2010-01-01 2010-01-01 false Monitoring and mitigation of... Environmental Effects § 970.702 Monitoring and mitigation of environmental effects. (a) Monitoring. If an... monitoring plan as part of the terms, conditions and restrictions developed for each license. The plan will...

  5. 44 CFR 201.6 - Local Mitigation Plans.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... agencies that have the authority to regulate development, as well as businesses, academia and other private... the mitigation plan within a five-year cycle. (ii) A process by which local governments incorporate...

  6. 44 CFR 201.4 - Standard State Mitigation Plans.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... resources to reducing the effects of natural hazards. (b) Planning process. An effective planning process is... mitigation as well as to development in hazard-prone areas; a discussion of State funding capabilities for... identified. (iv) Identification of current and potential sources of Federal, State, local, or private funding...

  7. 44 CFR 201.4 - Standard State Mitigation Plans.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... resources to reducing the effects of natural hazards. (b) Planning process. An effective planning process is... mitigation as well as to development in hazard-prone areas; a discussion of State funding capabilities for... identified. (iv) Identification of current and potential sources of Federal, State, local, or private funding...

  8. Resilience Planning Approaches “Ready-to-Use”: Lessons from EPA Partnerships. How to work with a community to design a nature-based hazard mitigation project

    EPA Science Inventory

    A fast-paced delivery of approaches developed in EPA partnerships to enable effective inclusion of environmental and social resilience into hazard mitigation planning. This presentation will cover a broad spectrum, from 1) EPA’s role in mitigation, 2) what a Regional Resil...

  9. 43 CFR 10005.8 - Mitigation obligations.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 43 Public Lands: Interior 2 2012-10-01 2012-10-01 false Mitigation obligations. 10005.8 Section... MITIGATION AND CONSERVATION COMMISSION POLICIES AND PROCEDURES FOR DEVELOPING AND IMPLEMENTING THE COMMISSION'S MITIGATION AND CONSERVATION PLAN § 10005.8 Mitigation obligations. While the Act authorizes the...

  10. 43 CFR 10005.8 - Mitigation obligations.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 43 Public Lands: Interior 2 2011-10-01 2011-10-01 false Mitigation obligations. 10005.8 Section... MITIGATION AND CONSERVATION COMMISSION POLICIES AND PROCEDURES FOR DEVELOPING AND IMPLEMENTING THE COMMISSION'S MITIGATION AND CONSERVATION PLAN § 10005.8 Mitigation obligations. While the Act authorizes the...

  11. 43 CFR 10005.8 - Mitigation obligations.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 43 Public Lands: Interior 2 2014-10-01 2014-10-01 false Mitigation obligations. 10005.8 Section... MITIGATION AND CONSERVATION COMMISSION POLICIES AND PROCEDURES FOR DEVELOPING AND IMPLEMENTING THE COMMISSION'S MITIGATION AND CONSERVATION PLAN § 10005.8 Mitigation obligations. While the Act authorizes the...

  12. 43 CFR 10005.8 - Mitigation obligations.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 43 Public Lands: Interior 2 2013-10-01 2013-10-01 false Mitigation obligations. 10005.8 Section... MITIGATION AND CONSERVATION COMMISSION POLICIES AND PROCEDURES FOR DEVELOPING AND IMPLEMENTING THE COMMISSION'S MITIGATION AND CONSERVATION PLAN § 10005.8 Mitigation obligations. While the Act authorizes the...

  13. Analysing the external supply chain risk driver competitiveness: a risk mitigation framework and business continuity plan.

    PubMed

    Blos, Mauricio F; Wee, Hui-Ming; Yang, Joshua

    2010-11-01

    Innovation challenges for handling supply chain risks have become one of the most important drivers in business competitiveness and differentiation. This study analyses competitiveness at the external supply chain level as a driver of risks and provides a framework for mitigating these risks. The mitigation framework, also called the supply chain continuity framework, provides insight into six stages of the business continuity planning (BCP) process life cycle (risk mitigation management, business impact analysis, supply continuity strategy development, supply continuity plan development, supply continuity plan testing and supply continuity plan maintenance), together with the operational constructs: customer service, inventory management, flexibility, time to market, ordering cycle time and quality. The purpose of the BCP process life cycle and operational constructs working together is to emphasise the way in which a supply chain can deal with disruption risks and, consequently, bring competitive advantage. Future research will consider the new risk scenarios and analyse the consequences to promote the improvement of supply chain resilience.

  14. Planning Tools For Seismic Risk Mitigation. Rules And Applications

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    De Paoli, Rosa Grazia

    2008-07-08

    Recently, Italian urban planning research in the field of seismic risk mitigation are renewing. In particular, it promotes strategies that integrate urban rehabilitation and aseismic objectives, and also politicizes that are directed to revitalizes urban systems, coupling physical renewal and socio-economic development.In Italy the first law concerning planning for seismic mitigation dates back 1974, the law n. 64 'Regulation for buildings with particular rules for the seismic areas' where the rules for buildings in seismic areas concerning also the local hazard. This law, in fact, forced the municipalities to acquire, during the formation of the plans, a preventive opinion ofmore » compatibility between planning conditions and geomorphology conditions of the territory. From this date the conviction that the seismic risk must be considered inside the territorial planning especially in terms of strategies of mitigation has been strengthened.The town planners have started to take an interest in seismic risk in the [80]s when the Irpinia's earthquake took place. The researches developed after this earthquake have established that the principal cause of the collapse of buildings are due to from the wrong location of urban settlements (on slopes or crowns) After Irpinia's earthquake the first researches on seismic risk mitigation, in particular on the aspects related to the hazards and to the urban vulnerability were made.« less

  15. New Science Applications Within the U.S. National Tsunami Hazard Mitigation Program

    NASA Astrophysics Data System (ADS)

    Wilson, R. I.; Eble, M. C.; Forson, C. K.; Horrillo, J. J.; Nicolsky, D.

    2017-12-01

    The U.S. National Tsunami Hazard Mitigation Program (NTHMP) is a collaborative State and Federal program which supports consistent and cost effective tsunami preparedness and mitigation activities at a community level. The NTHMP is developing a new five-year Strategic Plan based on the 2017 Tsunami Warning, Education, and Research Act as well as recommendations the 2017 NTHMP External Review Panel. Many NTHMP activities are based on the best available scientific methods through the NTHMP Mapping and Modeling Subcommittee (MMS). The primary activities for the MMS member States are to characterize significant tsunami sources, numerically model those sources, and create tsunami inundation maps for evacuation planning. This work remains a focus for many unmapped coastlines. With the lessons learned from the 2004 Indian Ocean and 2011 Tohoku Japan tsunamis, where both immediate risks and long-term recovery issues where recognized, the NTHMP MMS is expanding efforts into other areas that address community resilience. Tsunami evacuation modeling based on both pedestrian and vehicular modes of transportation are being developed by NTHMP States. Products include tools for the public to create personal evacuation maps. New tsunami response planning tools are being developed for both maritime and coastal communities. Maritime planning includes tsunami current-hazard maps for in-harbor and offshore response activities. Multi-tiered tsunami evacuation plans are being developed in some states to address local- versus distant-source tsunamis, as well as real-time evacuation plans, or "playbooks," for distant-source tsunamis forecasted to be less than the worst-case flood event. Products to assist community mitigation and recovery are being developed at a State level. Harbor Improvement Reports, which evaluate the impacts of currents, sediment, and debris on harbor infrastructure, include direct mitigation activities for Local Hazard Mitigation Plans. Building code updates in the five Pacific states will include new sections on tsunami load analysis of structures, and require Tsunami Design Zones based on probabilistic analyses. Guidance for community recovery planning has also been initiated. These new projects are being piloted by some States and will help create guidance for other States in the future.

  16. Rainwater Wildlife Area, Watershed Management Plan, A Columbia Basin Wildlife Mitigation Project, 2002.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Childs, Allen B.

    This Management Plan has been developed by the Confederated Tribes of the Umatilla Indian Reservation (CTUIR) to document how the Rainwater Wildlife Area (formerly known as the Rainwater Ranch) will be managed. The plan has been developed under a standardized planning process developed by the Bonneville Power Administration (BPA) for Columbia River Basin Wildlife Mitigation Projects (See Appendix A and Guiding Policies Section below). The plan outlines the framework for managing the project area, provides an assessment of existing conditions and key resource issues, and presents an array of habitat management and enhancement strategies. The plan culminates into a 5-Yearmore » Action Plan that will focus our management actions and prioritize funding during the Fiscal 2001-2005 planning period. This plan is a product of nearly two years of field studies and research, public scoping, and coordination with the Rainwater Advisory Committee. The committee consists of representatives from tribal government, state agencies, local government, public organizations, and members of the public. The plan is organized into several sections with Chapter 1 providing introductory information such as project location, purpose and need, project goals and objectives, common elements and assumptions, coordination efforts and public scoping, and historical information about the project area. Key issues are presented in Chapter 2 and Chapter 3 discusses existing resource conditions within the wildlife area. Chapter 4 provides a detailed presentation on management activities and Chapter 5 outlines a monitoring and evaluation plan for the project that will help assess whether the project is meeting the intended purpose and need and the goals and objectives. Chapter 6 displays the action plan and provides a prioritized list of actions with associated budget for the next five year period. Successive chapters contain appendices, references, definitions, and a glossary. The purpose of the project is to protect, enhance, and mitigate fish and wildlife resources impacted by Columbia River Basin hydroelectric development. The effort is one of several wildlife mitigation projects in the region developed to compensate for terrestrial habitat losses resulting from the construction of McNary and John Day Hydroelectric facilities located on the mainstem Columbia River. While this project is driven primarily by the purpose and need to mitigate for wildlife habitat losses, it is also recognized that management strategies will also benefit many other non-target fish and wildlife species and associated natural resources. The Rainwater project is much more than a wildlife project--it is a watershed project with potential to benefit resources at the watershed scale. Goals and objectives presented in the following sections include both mitigation and non-mitigation related goals and objectives.« less

  17. 44 CFR 201.6 - Local Mitigation Plans.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... agencies that have the authority to regulate development, as well as businesses, academia and other private... and development trends within the community so that mitigation options can be considered in future...

  18. National Wetland Mitigation Banking Study. Commercial Wetland Mitigation Credit Markets: Theory and Practice.

    DTIC Science & Technology

    1995-11-01

    based on established and incentive for Delta compliance. functioning replacement wetlands. Perhaps the most compelling reason given for why The permit...developed mitigation plans powerful incentive for ventures to carefully site, for the Cricket Creek site in accordance with the plan, and execute the...Opportunity. Lev, Esther (with field assistance by Peter Zika ) for the Lane County Council of Governments, 1988 (revised 1990), Preliminary Inventory of

  19. 43 CFR 10005.17 - Plan development process.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 43 Public Lands: Interior 2 2011-10-01 2011-10-01 false Plan development process. 10005.17 Section 10005.17 Public Lands: Interior Regulations Relating to Public Lands (Continued) UTAH RECLAMATION...'S MITIGATION AND CONSERVATION PLAN § 10005.17 Plan development process. Following adoption of the...

  20. Developing a congestion mitigation toolbox.

    DOT National Transportation Integrated Search

    2011-09-30

    Researchers created A Michigan Toolbox for Mitigating Traffic Congestion to be a useful desk reference for practitioners and an educational tool for elected officials acting through public policy boards to better understand the development, planning,...

  1. An analysis of land use planning and equity issues surrounding hazardous liquid and natural gas transmission pipelines in North Carolina

    NASA Astrophysics Data System (ADS)

    Osland, Anna Christine

    Hazardous liquid and natural gas transmission pipelines have received limited attention by planning scholars even though local development decisions can have broad consequences if a rupture occurs. In this dissertation, I evaluated the implications of land-use planning for reducing risk to transmission pipeline hazards in North Carolina via three investigations. First, using a survey of planning directors in jurisdictions with transmission pipeline hazards, I investigated the land use planning tools used to mitigate pipeline hazards and the factors associated with tool adoption. Planning scholars have documented the difficulty of inducing planning in hazardous areas, yet there remain gaps in knowledge about the factors associated with tool adoption. Despite the risks associated with pipeline ruptures, I found most localities use few mitigation tools, and the adoption of regulatory and informational tools appear to be influenced by divergent factors. Whereas risk perception, commitment, capacity, and community context were associated with total tool and information tool use, only risk perception and capacity factors were associated with regulatory tool use. Second, using interviews of emergency managers and planning directors, I examined the role of agency collaboration for building mitigation capacity. Scholars have highlighted the potential of technical collaboration, yet less research has investigated how inter-agency collaboration shapes mitigation capacity. I identify three categories of technical collaboration, discuss how collaborative spillovers can occur from one planning area to another, and challenge the notion that all technical collaborations result in equal mitigation outcomes. Third, I evaluated characteristics of the population near pipelines to address equity concerns. Surprisingly, I did not find broad support for differences in exposure of vulnerable populations. Nonetheless, my analyses uncovered statistically significant clusters of vulnerable groups within the hazard area. Interestingly, development closer to pipelines was newer than areas farther away, illustrating the failure of land-use planning to reduce development encroachment. Collectively, these results highlight the potential of land-use planning to keep people and development from encroaching on pipeline hazards. While this study indicates that planners in many areas address pipeline hazards, it also illustrates how changes to local practices can further reduce risks to human health, homeland security, and the environment.

  2. Hungry Horse Dam Fisheries Mitigation, 1992-1993 Progress Report.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    DosSantos, Joe; Vashro, Jim; Lockard, Larry

    1994-06-01

    In February of 1900, over forty agency representatives and interested citizens began development of the 1991 Mitigation Plan. This effort culminated in the 1993 Implementation Plan for mitigation of fish losses attributable to the construction and operation of Hungry Horse Dam. The primary purpose of this biennial report is to inform the public of the status of ongoing mitigation activities resulting from those planning efforts. A habitat improvement project is underway to benefit bull trout in Big Creek in the North Fork drainage of the Flathead River and work is planned in Hay Creek, another North Fork tributary. Bull troutmore » redd counts have been expanded and experimental programs involving genetic evaluation, outmigrant monitoring, and hatchery studies have been initiated, Cutthroat mitigation efforts have focused on habitat improvements in Elliott Creek and Taylor`s Outflow and improvements have been followed by imprint plants of hatchery fish and/or eyed eggs in those streams. Rogers Lake west of Kalispell and Lion Lake, near Hungry Horse, were chemically rehabilitated. Cool and warm water fish habitat has been improved in Halfmoon Lake and Echo Lake. Public education and public interest is important to the future success of mitigation activities. As part of the mitigation team`s public awareness responsibility we have worked with numerous volunteer groups, public agencies, and private landowners to stimulate interest and awareness of mitigation activities and the aquatic ecosystem. The purpose of this biennial report is to foster public awareness of, and support for, mitigation activities as we move forward in implementing the Hungry Horse Dam Fisheries Mitigation Implementation Plan.« less

  3. 44 CFR 201.7 - Tribal Mitigation Plans.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 44 Emergency Management and Assistance 1 2014-10-01 2014-10-01 false Tribal Mitigation Plans. 201... OF HOMELAND SECURITY DISASTER ASSISTANCE MITIGATION PLANNING § 201.7 Tribal Mitigation Plans. The Indian Tribal Mitigation Plan is the representation of the Indian tribal government's commitment to...

  4. Wetlands Mitigation Banking Concepts

    DTIC Science & Technology

    1992-07-01

    Naval Amphibious Bas Eslgrss Mit. Bank CA, San Diego Co. dredging & facilities Dept of the Navy SeaWorld Eelgras Mitigation Dank CA, San Diego Co...shore development, private projects SeaWorld 8 Table 2. WETLAND MITIGATION BANKS UNDER PLANNING, Institute for Water Resources Preliminary Survey Data

  5. 44 CFR 78.2 - Definitions.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... INSURANCE AND HAZARD MITIGATION National Flood Insurance Program FLOOD MITIGATION ASSISTANCE § 78.2... organization, that has zoning and building code jurisdiction over a particular area having special flood..., that is designated to develop and administer a mitigation plan by political subdivisions, all of which...

  6. 44 CFR 78.2 - Definitions.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... SECURITY INSURANCE AND HAZARD MITIGATION National Flood Insurance Program FLOOD MITIGATION ASSISTANCE § 78... organization, that has zoning and building code jurisdiction over a particular area having special flood..., that is designated to develop and administer a mitigation plan by political subdivisions, all of which...

  7. 44 CFR 78.2 - Definitions.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... SECURITY INSURANCE AND HAZARD MITIGATION National Flood Insurance Program FLOOD MITIGATION ASSISTANCE § 78... organization, that has zoning and building code jurisdiction over a particular area having special flood..., that is designated to develop and administer a mitigation plan by political subdivisions, all of which...

  8. 44 CFR 78.2 - Definitions.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... SECURITY INSURANCE AND HAZARD MITIGATION National Flood Insurance Program FLOOD MITIGATION ASSISTANCE § 78... organization, that has zoning and building code jurisdiction over a particular area having special flood..., that is designated to develop and administer a mitigation plan by political subdivisions, all of which...

  9. 44 CFR 78.2 - Definitions.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... SECURITY INSURANCE AND HAZARD MITIGATION National Flood Insurance Program FLOOD MITIGATION ASSISTANCE § 78... organization, that has zoning and building code jurisdiction over a particular area having special flood..., that is designated to develop and administer a mitigation plan by political subdivisions, all of which...

  10. Wildlife Habitat Impact Assessment, Chief Joseph Dam Project, Washington : Project Report 1992.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kuehn, Douglas; Berger, Matthew

    1992-01-01

    Under the Pacific Northwest Electric Power Planning and Conservation Act of 1980, and the subsequent Northwest Power Planning Council`s Columbia River Basin Fish and Wildlife Program, a wildlife habitat impact assessment and identification of mitigation objectives have been developed for the US Army Corps of Engineer`s Chief Joseph Dam Project in north-central Washington. This study will form the basis for future mitigation planning and implementation.

  11. Appalachian Stream Mitigation Workshop

    EPA Pesticide Factsheets

    A 5 day workshop in 2011 developed for state and federal regulatory and resource agencies, who review, comment on and/or approve compensatory mitigation plans for surface coal mining projects in Appalachia

  12. Wanaket Wildlife Area Management Plan : Five-Year Plan for Protecting, Enhancing, and Mitigating Wildlife Habitat Losses for the McNary Hydroelectric Facility.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Confederated Tribes of the Umatilla Indian Reservation Wildlife Program

    The Confederated Tribes of the Umatilla Indian Reservation (CTUIR) propose to continue to protect, enhance, and mitigate wildlife and wildlife habitat at the Wanaket Wildlife Area. The Wanaket Wildlife Area was approved as a Columbia River Basin Wildlife Mitigation Project by the Bonneville Power Administration (BPA) and Northwest Power Planning Council (NWPPC) in 1993. This management plan will provide an update of the original management plan approved by BPA in 1995. Wanaket will contribute towards meeting BPA's obligation to compensate for wildlife habitat losses resulting from the construction of the McNary Hydroelectric facility on the Columbia River. By funding themore » enhancement and operation and maintenance of the Wanaket Wildlife Area, BPA will receive credit towards their mitigation debt. The purpose of the Wanaket Wildlife Area management plan update is to provide programmatic and site-specific standards and guidelines on how the Wanaket Wildlife Area will be managed over the next five years. This plan provides overall guidance on both short and long term activities that will move the area towards the goals, objectives, and desired future conditions for the planning area. The plan will incorporate managed and protected wildlife and wildlife habitat, including operations and maintenance, enhancements, and access and travel management. Specific project objectives are related to protection and enhancement of wildlife habitats and are expressed in terms of habitat units (HU's). Habitat units were developed by the US Fish and Wildlife Service's Habitat Evaluation Procedures (HEP), and are designed to track habitat gains and/or losses associated with mitigation and/or development projects. Habitat Units for a given species are a product of habitat quantity (expressed in acres) and habitat quality estimates. Habitat quality estimates are developed using Habitat Suitability Indices (HSI). These indices are based on quantifiable habitat features such as vegetation height, shrub cover, or other parameters, which are known to provide life history requisites for mitigation species. Habitat Suitability Indices range from 0 to 1, with an HSI of 1 providing optimum habitat conditions for the selected species. One acre of optimum habitat provides one Habitat Unit. The objective of continued management of the Wanaket Wildlife Mitigation Area, including protection and enhancement of upland and wetland/wetland associated cover types, is to provide and maintain 2,334 HU's of protection credit and generate 2,495 HU's of enhancement credit by the year 2004.« less

  13. 10 CFR 1021.331 - Mitigation action plans.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 10 Energy 4 2012-01-01 2012-01-01 false Mitigation action plans. 1021.331 Section 1021.331 Energy... Implementing Procedures § 1021.331 Mitigation action plans. (a) Following completion of each EIS and its associated ROD, DOE shall prepare a Mitigation Action Plan that addresses mitigation commitments expressed in...

  14. 10 CFR 1021.331 - Mitigation action plans.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 10 Energy 4 2014-01-01 2014-01-01 false Mitigation action plans. 1021.331 Section 1021.331 Energy... Implementing Procedures § 1021.331 Mitigation action plans. (a) Following completion of each EIS and its associated ROD, DOE shall prepare a Mitigation Action Plan that addresses mitigation commitments expressed in...

  15. 10 CFR 1021.331 - Mitigation action plans.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 4 2011-01-01 2011-01-01 false Mitigation action plans. 1021.331 Section 1021.331 Energy... Implementing Procedures § 1021.331 Mitigation action plans. (a) Following completion of each EIS and its associated ROD, DOE shall prepare a Mitigation Action Plan that addresses mitigation commitments expressed in...

  16. 10 CFR 1021.331 - Mitigation action plans.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 4 2010-01-01 2010-01-01 false Mitigation action plans. 1021.331 Section 1021.331 Energy... Implementing Procedures § 1021.331 Mitigation action plans. (a) Following completion of each EIS and its associated ROD, DOE shall prepare a Mitigation Action Plan that addresses mitigation commitments expressed in...

  17. 44 CFR 201.5 - Enhanced State Mitigation Plans.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 44 Emergency Management and Assistance 1 2012-10-01 2011-10-01 true Enhanced State Mitigation..., DEPARTMENT OF HOMELAND SECURITY DISASTER ASSISTANCE MITIGATION PLANNING § 201.5 Enhanced State Mitigation Plans. (a) A State with a FEMA approved Enhanced State Mitigation Plan at the time of a disaster...

  18. 10 CFR 1021.331 - Mitigation action plans.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 10 Energy 4 2013-01-01 2013-01-01 false Mitigation action plans. 1021.331 Section 1021.331 Energy... Implementing Procedures § 1021.331 Mitigation action plans. (a) Following completion of each EIS and its associated ROD, DOE shall prepare a Mitigation Action Plan that addresses mitigation commitments expressed in...

  19. Lunar Dust Mitigation Technology Development

    NASA Technical Reports Server (NTRS)

    Hyatt, Mark J.; Deluane, Paul B.

    2008-01-01

    NASA s plans for implementing the Vision for Space Exploration include returning to the moon as a stepping stone for further exploration of Mars, and beyond. Dust on the lunar surface has a ubiquitous presence which must be explicitly addressed during upcoming human lunar exploration missions. While the operational challenges attributable to dust during the Apollo missions did not prove critical, the comparatively long duration of impending missions presents a different challenge. Near term plans to revisit the moon places a primary emphasis on characterization and mitigation of lunar dust. Comprised of regolith particles ranging in size from tens of nanometers to microns, lunar dust is a manifestation of the complex interaction of the lunar soil with multiple mechanical, electrical, and gravitational effects. The environmental and anthropogenic factors effecting the perturbation, transport, and deposition of lunar dust must be studied in order to mitigate it s potentially harmful effects on exploration systems. This paper presents the current perspective and implementation of dust knowledge management and integration, and mitigation technology development activities within NASA s Exploration Technology Development Program. This work is presented within the context of the Constellation Program s Integrated Lunar Dust Management Strategy. The Lunar Dust Mitigation Technology Development project has been implemented within the ETDP. Project scope and plans will be presented, along with a a perspective on lessons learned from Apollo and forensics engineering studies of Apollo hardware. This paper further outlines the scientific basis for lunar dust behavior, it s characteristics and potential effects, and surveys several potential strategies for its control and mitigation both for lunar surface operations and within the working volumes of a lunar outpost.

  20. A Michigan toolbox for mitigating traffic congestion.

    DOT National Transportation Integrated Search

    2011-09-30

    "Researchers created A Michigan Toolbox for Mitigating Traffic Congestion to be a useful desk reference : for practitioners and an educational tool for elected officials acting through public policy boards to better : understand the development, plan...

  1. Vegetation and other development options for mitigating urban air pollution impacts

    Treesearch

    Richard Baldauf; David J. Nowak

    2014-01-01

    While air pollution control devices and programs are the primary method of reducing emissions, urban air pollution can be further mitigated through planning and design strategies, including vegetation preservation and planting, building design and development, installing roadside and near-source structures, and modifying surrounding terrain features.

  2. 30 CFR 250.254 - What mitigation measures information must accompany the DPP or DOCD?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 2 2010-07-01 2010-07-01 false What mitigation measures information must accompany the DPP or DOCD? 250.254 Section 250.254 Mineral Resources MINERALS MANAGEMENT SERVICE, DEPARTMENT... Information Contents of Development and Production Plans (dpp) and Development Operations Coordination...

  3. REVIEW OF SELECTED STATE-OF-THE-ART APPLICATIONS OF DIAGNOSTIC MEASUREMENTS FOR RADON MITIGATION PLANNING

    EPA Science Inventory

    Since late-1984, EPA's AEERL has supported a program to develop and demonstrate radon mitigation techniques for single-family detached dwellings. As part of the program, projects have been started directed at developing and demonstrating the use of diagnostic measurements in all ...

  4. 44 CFR 78.6 - Flood Mitigation Plan approval process.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 44 Emergency Management and Assistance 1 2011-10-01 2011-10-01 false Flood Mitigation Plan..., DEPARTMENT OF HOMELAND SECURITY INSURANCE AND HAZARD MITIGATION National Flood Insurance Program FLOOD MITIGATION ASSISTANCE § 78.6 Flood Mitigation Plan approval process. The State POC will forward all Flood...

  5. 44 CFR 78.6 - Flood Mitigation Plan approval process.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 44 Emergency Management and Assistance 1 2013-10-01 2013-10-01 false Flood Mitigation Plan..., DEPARTMENT OF HOMELAND SECURITY INSURANCE AND HAZARD MITIGATION National Flood Insurance Program FLOOD MITIGATION ASSISTANCE § 78.6 Flood Mitigation Plan approval process. The State POC will forward all Flood...

  6. 44 CFR 78.6 - Flood Mitigation Plan approval process.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 44 Emergency Management and Assistance 1 2014-10-01 2014-10-01 false Flood Mitigation Plan..., DEPARTMENT OF HOMELAND SECURITY INSURANCE AND HAZARD MITIGATION National Flood Insurance Program FLOOD MITIGATION ASSISTANCE § 78.6 Flood Mitigation Plan approval process. The State POC will forward all Flood...

  7. Wetland Mitigation Monitoring at the Fernald Preserve - 13200

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Powell, Jane; Bien, Stephanie; Decker, Ashlee

    The U.S. Department of Energy is responsible for 7.2 hectares (17.8 acres) of mitigation wetland at the Fernald Preserve, Ohio. Remedial activities affected the wetlands, and mitigation plans were incorporated into site-wide ecological restoration planning. In 2008, the Fernald Natural Resource Trustees developed a comprehensive wetland mitigation monitoring approach to evaluate whether compensatory mitigation requirements have been met. The Fernald Preserve Wetland Mitigation Monitoring Plan provided a guideline for wetland evaluations. The Ohio Environmental Protection Agency (Ohio EPA) wetland mitigation monitoring protocols were adopted as the means for compensatory wetland evaluation. Design, hydrologic regime, vegetation, wildlife, and biogeochemistry were evaluatedmore » from 2009 to 2011. Evaluations showed mixed results when compared to the Ohio EPA performance standards. Results of vegetation monitoring varied, with the best results occurring in wetlands adjacent to forested areas. Amphibians, particularly ambystomatid salamanders, were observed in two areas adjacent to forested areas. Not all wetlands met vegetation performance standards and amphibian biodiversity metrics. However, Fernald mitigation wetlands showed substantially higher ratings compared to other mitigated wetlands in Ohio. Also, soil sampling results remain consistent with other Ohio mitigated wetlands. The performance standards are not intended to be 'pass/fail' criteria; rather, they are reference points for use in making decisions regarding future monitoring and maintenance. The Trustees approved the Fernald Preserve Wetland Mitigation Monitoring Report with the provision that long-term monitoring of the wetlands continues at the Fernald Preserve. (authors)« less

  8. Albeni Falls Wildlife Protection, Mitigation, and Enhancement Plan, Final Report 1987.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Martin, Robert C.

    1988-08-01

    A wildlife impact assessment and mitigation plan has been developed for the US Army Corps of Engineers Albeni Falls Project in northern Idaho. The Habitat Evaluation Procedure (HEP) was used to evaluate pre- and post-construction habitat conditions at the Albeni Falls Project. There were 6617 acres of wetlands converted to open water due to development and operation of the project. Eight evaluation species were selected with impacts expressed in numbers of Habitat Units (HU's). For a given species, one HU is equivalent to one acre of prime habitat. The Albeni Falls Project resulted in estimated losses of 5985 mallard HU's,more » 4699 Canada goose HU's, 3379 redhead HU's, 4508 breeding bald eagle HU's, 4365 wintering bald eagle HU's, 2286 black-capped chickadee HU's, 1680 white-tailed deer HU's, and 1756 muskrat HU's. The yellow warbler gained 71 HU's. Therefore, total target species estimated impacts were 28,587 HU's. Impacts on peregrine falcons were not quantified in terms of HU's. Projects have been proposed by an interagency team of biologists to mitigate the impacts of Albeni Falls on wildlife. The HEP was used to estimate benefits of proposed mitigation projects to target species. Through a series of proposed protection and enhancement actions, the mitigation plan will provide benefits of an estimated 28,590 target species HU's to mitigate Albeni Falls wildlife habitat values lost. 52 refs., 9 figs., 14 tabs.« less

  9. 44 CFR 78.6 - Flood Mitigation Plan approval process.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 44 Emergency Management and Assistance 1 2012-10-01 2011-10-01 true Flood Mitigation Plan approval..., DEPARTMENT OF HOMELAND SECURITY INSURANCE AND HAZARD MITIGATION National Flood Insurance Program FLOOD MITIGATION ASSISTANCE § 78.6 Flood Mitigation Plan approval process. The State POC will forward all Flood...

  10. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hoffman, Greg; Marotz, Brian L.; Dunnigan, James

    ''Mitigation for the Construction and Operation of Libby Dam'' is part of the Northwest Power Planning Council's resident fish and wildlife program. The program was mandated by the Northwest Planning Act of 1980, and is responsible for mitigating for damages to fish and wildlife caused by hydroelectric development in the Columbia River Basin. The objective of Phase I of the project (1983 through 1987) was to maintain or enhance the Libby Reservoir fishery by quantifying seasonal water levels and developing ecologically sound operational guidelines. The objective of Phase II of the project (1988 through 1996) was to determine the biologicalmore » effects of reservoir operations combined with biotic changes associated with an aging reservoir. The objectives of Phase III of the project (1996 through present) are to implement habitat enhancement measures to mitigate for dam effects, to provide data for implementation of operational strategies that benefit resident fish, monitor reservoir and river conditions, and monitor mitigation projects for effectiveness.« less

  11. Accounting for vulnerable populations in rural hazard mitigation plans: results of a survey of emergency managers.

    PubMed

    Horney, Jennifer A; Nguyen, Mai; Cooper, John; Simon, Matthew; Ricchetti-Masterson, Kristen; Grabich, Shannon; Salvesen, David; Berke, Philip

    2013-01-01

    Rural areas of the United States are uniquely vulnerable to the impacts of natural disasters. One possible way to mitigate vulnerability to disasters in rural communities is to have a high-quality hazard mitigation plan in place. To understand the resources available for hazard mitigation planning and determine how well hazard mitigation plans in rural counties meet the needs of vulnerable populations, we surveyed the lead planning or emergency management official responsible for hazard mitigation plans in 96 rural counties in eight states in the Southeastern United States. In most counties, emergency management was responsible for implementing the county's hazard mitigation plan and the majority of counties had experienced a presidentially declared disaster in the last 5 years. Our research findings demonstrated that there were differences in subjective measures of vulnerability (as reported by survey respondents) and objective measures of vulnerability (as determined by US Census data). In addition, although few counties surveyed included outreach to vulnerable groups as a part of their hazard mitigation planning process, a majority felt that their hazard mitigation plan addressed the needs of vulnerable populations "well" or "very well." These differences could result in increased vulnerabilities in rural areas, particularly for certain vulnerable groups.

  12. 44 CFR 78.3 - Responsibilities.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... HOMELAND SECURITY INSURANCE AND HAZARD MITIGATION National Flood Insurance Program FLOOD MITIGATION... each State through the annual Cooperative Agreements; (2) Approve Flood Mitigation Plans in accordance... Planning and Projects Grants; (2) Prepare and submit the Flood Mitigation Plan; (3) Implement all approved...

  13. 44 CFR 78.3 - Responsibilities.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... HOMELAND SECURITY INSURANCE AND HAZARD MITIGATION National Flood Insurance Program FLOOD MITIGATION... each State through the annual Cooperative Agreements; (2) Approve Flood Mitigation Plans in accordance... Planning and Projects Grants; (2) Prepare and submit the Flood Mitigation Plan; (3) Implement all approved...

  14. 44 CFR 78.3 - Responsibilities.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... HOMELAND SECURITY INSURANCE AND HAZARD MITIGATION National Flood Insurance Program FLOOD MITIGATION... each State through the annual Cooperative Agreements; (2) Approve Flood Mitigation Plans in accordance... Planning and Projects Grants; (2) Prepare and submit the Flood Mitigation Plan; (3) Implement all approved...

  15. 44 CFR 78.3 - Responsibilities.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... HOMELAND SECURITY INSURANCE AND HAZARD MITIGATION National Flood Insurance Program FLOOD MITIGATION... each State through the annual Cooperative Agreements; (2) Approve Flood Mitigation Plans in accordance... Planning and Projects Grants; (2) Prepare and submit the Flood Mitigation Plan; (3) Implement all approved...

  16. 44 CFR 78.3 - Responsibilities.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... SECURITY INSURANCE AND HAZARD MITIGATION National Flood Insurance Program FLOOD MITIGATION ASSISTANCE § 78... State through the annual Cooperative Agreements; (2) Approve Flood Mitigation Plans in accordance with... Planning and Projects Grants; (2) Prepare and submit the Flood Mitigation Plan; (3) Implement all approved...

  17. Determination of Section 404 Permit and Habitat Mitigation Requirements

    DOT National Transportation Integrated Search

    2012-09-01

    The Arizona Department of Transportation (ADOT) is committed to developing habitat, mitigation, : monitoring, and maintenance plans that replace the loss of the functions and values of an area and : are self-sustaining, thereby providing long-term co...

  18. Lower Clearwater Aquatic Mammal Survey. Final Report.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Mack, Curt; Kronemann, Loren A.; Eneas, Cheryl

    BPA provided funding to collect baseline data on river otters to assist in developing mitigation implementation plans for river otters percent to the Northwest Power Planning Council's Columbia River Basin Fish and Wildlife Program, sections 1003 (b)(2) and (3). Distribution, movements, habitat use, and diets of river otters were investigated in the Clearwater River within the Nez Perce Indian Reservation from 1991-1992. The study outlined recommendations to guide development of mitigation implementation plans for riparian habitats. Sections of the Clearwater River were identified that if protected or enhanced would provide optimal benefit to otters. Habitat improvement alternatives were also outlinedmore » which could be used to enhance otter habitats.« less

  19. Kootenai River Wildlife Habitat Enhancement Project : Long-term Bighorn Sheep/Mule Deer Winter and Spring Habitat Improvement Project : Wildlife Mitigation Project, Libby Dam, Montana : Management Plan.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Yde, Chis

    1990-06-01

    The Libby hydroelectric project, located on the Kootenai River in northwestern Montana, resulted in several impacts to the wildlife communities which occupied the habitats inundated by Lake Koocanusa. Montana Department of Fish, Wildlife and Parks, in cooperation with the other management agencies, developed an impact assessment and a wildlife and wildlife habitat mitigation plan for the Libby hydroelectric facility. In response to the mitigation plan, Bonneville Power Administration funded a cooperative project between the Kootenai National Forest and Montana Department of Fish, Wildlife and Parks to develop a long-term habitat enhancement plan for the bighorn sheep and mule deer wintermore » and spring ranges adjacent to Lake Koocanusa. The project goal is to rehabilitate 3372 acres of bighorn sheep and 16,321 acres of mule deer winter and spring ranges on Kootenai National Forest lands adjacent to Lake Koocanusa and to monitor and evaluate the effects of implementing this habitat enhancement work. 2 refs.« less

  20. Albeni Falls Wildlife Mitigation : Annual Report 2002.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Terra-Berns, Mary

    The Albeni Falls Interagency Work Group continued to actively engage in implementing wildlife mitigation actions in 2002. Regular Work Group meetings were held to discuss budget concerns affecting the Albeni Falls Wildlife Mitigation Program, to present potential acquisition projects, and to discuss and evaluate other issues affecting the Work Group and Project. Work Group members protected 1,386.29 acres of wildlife habitat in 2002. To date, the Albeni Falls project has protected approximately 5,914.31 acres of wildlife habitat. About 21% of the total wildlife habitat lost has been mitigated. Administrative activities have increased as more properties are purchased and continue tomore » center on restoration, operation and maintenance, and monitoring. In 2001, Work Group members focused on development of a monitoring and evaluation program as well as completion of site-specific management plans. This year the Work Group began implementation of the monitoring and evaluation program performing population and plant surveys, data evaluation and storage, and map development as well as developing management plans. Assuming that the current BPA budget restrictions will be lifted in the near future, the Work Group expects to increase mitigation properties this coming year with several potential projects.« less

  1. Vegetation and other development options for mitigating urban air pollution impacts

    EPA Science Inventory

    In addition to installing air pollution control devices and reducing emissions activities, urban air pollution can be further mitigated through planning and design strategies including vegetation planting, building design, installing roadside and near source structures, and modif...

  2. Bridging Climate Change Resilience and Mitigation in the Electricity Sector Through Renewable Energy and Energy Efficiency: Emerging Climate Change and Development Topics for Energy Sector Transformation

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Cox, Sarah L; Hotchkiss, Elizabeth L; Bilello, Daniel E

    Reliable, safe, and secure electricity is essential for economic and social development and a necessary input for many sectors of the economy. However, electricity generation and associated processes make up a significant portion of global greenhouse gas (GHG) emissions contributing to climate change. Furthermore, electricity systems are vulnerable to climate change impacts - both short-term events and changes over the longer term. This vulnerability presents both near-term and chronic challenges in providing reliable, affordable, equitable, and sustainable energy services. Within this context, developing countries face a number of challenges in the energy sector, including the need to reliably meet growingmore » electricity demand, lessen dependence on imported fuels, expand energy access, and improve stressed infrastructure for fuel supply and electricity transmission. Energy efficiency (EE) and renewable energy (RE) technical solutions described in this paper can bridge action across climate change mitigation and resilience through reducing GHG emissions and supporting electric power sector adaptation to increasing climate risk. Integrated planning approaches, also highlighted in this paper, play an integral role in bringing together mitigation and resilience action under broader frameworks. Through supporting EE and RE deployment and integrated planning approaches, unique to specific national and local circumstances, countries can design and implement policies, strategies, and sectoral plans that unite development priorities, climate change mitigation, and resilience.« less

  3. Susitna Hydroelectric Project: terrestrial environmental workshop and preliminary simulation model

    USGS Publications Warehouse

    Everitt, Robert R.; Sonntag, Nicholas C.; Auble, Gregory T.; Roelle, James E.; Gazey, William

    1982-01-01

    The technical feasibility, economic viability, and environmental impacts of a hydroelectric development project in the Susitna River Basin are being studied by Acres American, Inc. on behalf of the Alaska Power Authority. As part of these studies, Acres American recently contracted LGL Alaska Research Associates, Inc. to coordinate the terrestrial environmental studies being performed by the Alaska Department of Fish and Game and, as subcontractors to LGL, several University of Alaska research groups. LGL is responsible for further quantifying the potential impacts of the project on terrestrial wildlife and vegetation, and for developing a plan to mitigate adverse impacts on the terrestrial environment. The impact assessment and mitigation plan will be included as part of a license application to the Federal Energy Regulatory Commission (FERC) scheduled for the first quarter of 1983. The quantification of impacts, mitigation planning, and design of future research is being organized using a computer simulation modelling approach. Through a series of workshops attended by researchers, resource managers, and policy-makers, a computer model is being developed and refined for use in the quantification of impacts on terrestrial wildlife and vegetation, and for evaluating different mitigation measures such as habitat enhancement and the designation of replacement lands to be managed by wildlife habitat. This report describes the preliminary model developed at the first workshop held August 23 -27, 1982 in Anchorage.

  4. New Tsunami Response, Mitigation, and Recovery Planning "Playbooks" for California (USA) Maritime Communities

    NASA Astrophysics Data System (ADS)

    Wilson, R. I.; Lynett, P. J.; Miller, K.; Eskijian, M.; Dengler, L. A.; Ayca, A.; Keen, A.; Admire, A. R.; Siegel, J.; Johnson, L. A.; Curtis, E.; Hornick, M.

    2015-12-01

    The 2010 Chile and 2011 Japan tsunamis both struck the California coast offering valuable experience and raised a number of significant issues for harbor masters, port captains, and other maritime entities. There was a general call for more planning products to help guide maritime communities in their tsunami response, mitigation, and recovery activities. The State of California is working with the U.S. Federal Emergency Management Agency (FEMA), the U.S. National Tsunami Hazard Mitigation Program (NTHMP), and other tsunami experts to provide communities with new tsunami planning tools to address these issues: Response Playbooks and plans have been developed for ports and harbors identifying potential tsunami current hazards and related damage for various size events. Maps have been generated showing minor, moderate, and severe damage levels that have been linked to current velocity thresholds of 3, 6, and 9 knots, respectively. Knowing this information allows harbor personnel to move ships or strengthen infrastructure prior to the arrival of distant source tsunamis. Damage probability tools and mitigation plans have been created to help reduce tsunami damage by evaluating the survivability of small and large vessels in harbors and ports. These results were compared to the actual damage assessments performed in California and Japan following the 2011 Japanese tsunami. Fragility curves were developed based on current velocity and direction to help harbor and port officials upgrade docks, piles, and related structures. Guidance documents are being generated to help in the development of both local and statewide recovery plans. Additional tools, like post-tsunami sediment and debris movement models, will allow harbors and ports to better understand if and where recovery issues are most likely to occur. Streamlining the regulatory and environmental review process is also a goal of the guidance. These maritime products and procedures are being integrated into guidance through the NTHMP to help other U.S. states/territories/commonwealths develop their own tsunami planning tools. This will lead to more accurate, consistent, and cost-effective tsunami planning strategies within the U.S.

  5. Bigger is better: Improved nature conservation and economic returns from landscape-level mitigation.

    PubMed

    Kennedy, Christina M; Miteva, Daniela A; Baumgarten, Leandro; Hawthorne, Peter L; Sochi, Kei; Polasky, Stephen; Oakleaf, James R; Uhlhorn, Elizabeth M; Kiesecker, Joseph

    2016-07-01

    Impact mitigation is a primary mechanism on which countries rely to reduce environmental externalities and balance development with conservation. Mitigation policies are transitioning from traditional project-by-project planning to landscape-level planning. Although this larger-scale approach is expected to provide greater conservation benefits at the lowest cost, empirical justification is still scarce. Using commercial sugarcane expansion in the Brazilian Cerrado as a case study, we apply economic and biophysical steady-state models to quantify the benefits of the Brazilian Forest Code (FC) under landscape- and property-level planning. We find that FC compliance imposes small costs to business but can generate significant long-term benefits to nature: supporting 32 (±37) additional species (largely habitat specialists), storing 593,000 to 2,280,000 additional tons of carbon worth $69 million to $265 million ($ pertains to U.S. dollars), and marginally improving surface water quality. Relative to property-level compliance, we find that landscape-level compliance reduces total business costs by $19 million to $35 million per 6-year sugarcane growing cycle while often supporting more species and storing more carbon. Our results demonstrate that landscape-level mitigation provides cost-effective conservation and can be used to promote sustainable development.

  6. 76 FR 33327 - Agency Information Collection Activities: Submission for OMB Review; Comment Request, OMB No...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-08

    ...; State/Local/Tribal Hazard Mitigation Plans AGENCY: Federal Emergency Management Agency, DHS. ACTION... . SUPPLEMENTARY INFORMATION: Collection of Information Title: State/Local/Tribal Hazard Mitigation Plans. Type of... Tribal Hazard Mitigation Plan requirements is to support the administration of FEMA Mitigation grant...

  7. Rainwater Wildlife Area Management Plan Executive Summary : A Columbia Basin Wildlife Mitigation Project.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Childs, Allen B.

    This Executive Summary provides an overview of the Draft Rainwater Wildlife Area Management Plan. The comprehensive plan can be viewed on the Confederated Tribes of the Umatilla Indian Reservation (CTUIR) website at: www.umatilla.nsn.us or requested in hard copy from the CTUIR at the address below. The wildlife area was established in September 1998 when the CTUIR purchased the Rainwater Ranch through Bonneville Power Administration (BPA) for purposes of fish and wildlife mitigation for the McNary and John Day dams. The Management Plan has been developed under a standardized planning process developed by BPA for Columbia River Basin Wildlife Mitigation Projectsmore » (See Guiding Policies Section below). The plan outlines the framework for managing the project area, provides an assessment of existing conditions and key resource issues, and presents an array of habitat management and enhancement strategies. The plan culminates into a 5-Year Action Plan that will focus management actions and prioritize funding during the 2002-2006 planning period. Since acquisition of the property in late 1998, the CTUIR has conducted an extensive baseline resource assessment in preparation for the management plan, initiated habitat restoration in the Griffin Fork drainage to address road-related resource damage caused by roads constructed for forest practices and an extensive flood event in 1996, and initiated infrastructure developments associated with the Access and Travel Management Plan (i.e., installed parking areas, gates, and public information signs). In addition to these efforts, the CTUIR has worked to set up a long-term funding mechanism with BPA through the NPPC Fish and Wildlife Program. The CTUIR has also continued to coordinate closely with local and state government organizations to ensure consistency with local land use laws and maintain open lines of communication regarding important issues such as big game hunting, tribal member exercise of treaty rights, and public access. During the past two years, non-Indian public concern over big game hunting issues has at times overwhelmed other issues related to the wildlife area. In 2001, the CTUIR Fish and Wildlife Committee closed the wildlife area to tribal branch antlered bull elk harvest in response to harvest data that indicated harvest rates were greater than expected. In addition, illegal harvest of mature bull elk in southeastern Washington during the 2001 season exceeded the legal tribal and nontribal harvest combined which has created a potential significant regression in the bull;cow ratio in the Blue Mountain Elk herd. CTUIR Fish and Wildlife Committee and staff and Washington Department of Fish and Wildlife Regional Director and staff have been coordinating regularly to develop strategies to address harvest rates and ensure protection of viable big game herds in southeastern Washington. The CTUIR Fish and Wildlife Committee and WDFW has jointly agreed to continue close coordination on this and other issues and continue working together to ensure the long-term vigor of the elk herd on the Rainwater Wildlife Area. The purpose of the project is to protect, enhance, and mitigate fish and wildlife resources impacted by Columbia River Basin hydroelectric development. The effort is one of several wildlife mitigation projects in the region developed to compensate for terrestrial habitat losses resulting from the construction of McNary and John Day Hydroelectric facilities located on the mainstem Columbia River. While this project is driven primarily by the purpose and need to mitigate for wildlife habitat losses, it is also recognized that management strategies will also benefit many other non-target fish and wildlife species and associated natural resources.« less

  8. CO2 Mitigation Measures of Power Sector and Its Integrated Optimization in China

    PubMed Central

    Dai, Pan; Chen, Guang; Zhou, Hao; Su, Meirong; Bao, Haixia

    2012-01-01

    Power sector is responsible for about 40% of the total CO2 emissions in the world and plays a leading role in climate change mitigation. In this study, measures that lower CO2 emissions from the supply side, demand side, and power grid are discussed, based on which, an integrated optimization model of CO2 mitigation (IOCM) is proposed. Virtual energy, referring to energy saving capacity in both demand side and the power grid, together with conventional energy in supply side, is unified planning for IOCM. Consequently, the optimal plan of energy distribution, considering both economic benefits and mitigation benefits, is figured out through the application of IOCM. The results indicate that development of demand side management (DSM) and smart grid can make great contributions to CO2 mitigation of power sector in China by reducing the CO2 emissions by 10.02% and 12.59%, respectively, in 2015, and in 2020. PMID:23213305

  9. Applying the Land Use Portfolio Model to Estimate Natural-Hazard Loss and Risk - A Hypothetical Demonstration for Ventura County, California

    USGS Publications Warehouse

    Dinitz, Laura B.

    2008-01-01

    With costs of natural disasters skyrocketing and populations increasingly settling in areas vulnerable to natural hazards, society is challenged to better allocate its limited risk-reduction resources. In 2000, Congress passed the Disaster Mitigation Act, amending the Robert T. Stafford Disaster Relief and Emergency Assistance Act (Robert T. Stafford Disaster Relief and Emergency Assistance Act, Pub. L. 93-288, 1988; Federal Emergency Management Agency, 2002, 2008b; Disaster Mitigation Act, 2000), mandating that State, local, and tribal communities prepare natural-hazard mitigation plans to qualify for pre-disaster mitigation grants and post-disaster aid. The Federal Emergency Management Agency (FEMA) was assigned to coordinate and implement hazard-mitigation programs, and it published information about specific mitigation-plan requirements and the mechanisms (through the Hazard Mitigation Grant Program-HMGP) for distributing funds (Federal Emergency Management Agency, 2002). FEMA requires that each community develop a mitigation strategy outlining long-term goals to reduce natural-hazard vulnerability, mitigation objectives and specific actions to reduce the impacts of natural hazards, and an implementation plan for those actions. The implementation plan should explain methods for prioritizing, implementing, and administering the actions, along with a 'cost-benefit review' justifying the prioritization. FEMA, along with the National Institute of Building Sciences (NIBS), supported the development of HAZUS ('Hazards U.S.'), a geospatial natural-hazards loss-estimation tool, to help communities quantify potential losses and to aid in the selection and prioritization of mitigation actions. HAZUS was expanded to a multiple-hazard version, HAZUS-MH, that combines population, building, and natural-hazard science and economic data and models to estimate physical damages, replacement costs, and business interruption for specific natural-hazard scenarios. HAZUS-MH currently performs analyses for earthquakes, floods, and hurricane wind. HAZUS-MH loss estimates, however, do not account for some uncertainties associated with the specific natural-hazard scenarios, such as the likelihood of occurrence within a particular time horizon or the effectiveness of alternative risk-reduction options. Because of the uncertainties involved, it is challenging to make informative decisions about how to cost-effectively reduce risk from natural-hazard events. Risk analysis is one approach that decision-makers can use to evaluate alternative risk-reduction choices when outcomes are unknown. The Land Use Portfolio Model (LUPM), developed by the U.S. Geological Survey (USGS), is a geospatial scenario-based tool that incorporates hazard-event uncertainties to support risk analysis. The LUPM offers an approach to estimate and compare risks and returns from investments in risk-reduction measures. This paper describes and demonstrates a hypothetical application of the LUPM for Ventura County, California, and examines the challenges involved in developing decision tools that provide quantitative methods to estimate losses and analyze risk from natural hazards.

  10. 15 CFR 923.25 - Shoreline erosion/mitigation planning.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... purpose in developing this planning process is to give special attention to erosion issues. This special management attention may be achieved by designating erosion areas as areas of particular concern pursuant to...

  11. Planning for Flood Recovery and Long-Term Resilience in Vermont

    EPA Pesticide Factsheets

    Vermont requested technical assistance from EPA and FEMA that focused on incorporating smart growth principles into state policies, local development regulations, and Hazard Mitigation Plans to increase community flood resilience.

  12. MO-D-213-02: Quality Improvement Through a Failure Mode and Effects Analysis of Pediatric External Beam Radiotherapy

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Gray, J; Lukose, R; Bronson, J

    2015-06-15

    Purpose: To conduct a failure mode and effects analysis (FMEA) as per AAPM Task Group 100 on clinical processes associated with teletherapy, and the development of mitigations for processes with identified high risk. Methods: A FMEA was conducted on clinical processes relating to teletherapy treatment plan development and delivery. Nine major processes were identified for analysis. These steps included CT simulation, data transfer, image registration and segmentation, treatment planning, plan approval and preparation, and initial and subsequent treatments. Process tree mapping was utilized to identify the steps contained within each process. Failure modes (FM) were identified and evaluated with amore » scale of 1–10 based upon three metrics: the severity of the effect, the probability of occurrence, and the detectability of the cause. The analyzed metrics were scored as follows: severity – no harm = 1, lethal = 10; probability – not likely = 1, certainty = 10; detectability – always detected = 1, undetectable = 10. The three metrics were combined multiplicatively to determine the risk priority number (RPN) which defined the overall score for each FM and the order in which process modifications should be deployed. Results: Eighty-nine procedural steps were identified with 186 FM accompanied by 193 failure effects with 213 potential causes. Eighty-one of the FM were scored with a RPN > 10, and mitigations were developed for FM with RPN values exceeding ten. The initial treatment had the most FM (16) requiring mitigation development followed closely by treatment planning, segmentation, and plan preparation with fourteen each. The maximum RPN was 400 and involved target delineation. Conclusion: The FMEA process proved extremely useful in identifying previously unforeseen risks. New methods were developed and implemented for risk mitigation and error prevention. Similar to findings reported for adult patients, the process leading to the initial treatment has an associated high risk.« less

  13. 44 CFR 78.9 - Planning grant approval process.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ..., DEPARTMENT OF HOMELAND SECURITY INSURANCE AND HAZARD MITIGATION National Flood Insurance Program FLOOD MITIGATION ASSISTANCE § 78.9 Planning grant approval process. The State POC will evaluate and approve applications for Planning Grants. Funds will be provided only for the flood portion of any mitigation plan, and...

  14. 44 CFR 78.9 - Planning grant approval process.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ..., DEPARTMENT OF HOMELAND SECURITY INSURANCE AND HAZARD MITIGATION National Flood Insurance Program FLOOD MITIGATION ASSISTANCE § 78.9 Planning grant approval process. The State POC will evaluate and approve applications for Planning Grants. Funds will be provided only for the flood portion of any mitigation plan, and...

  15. 44 CFR 78.9 - Planning grant approval process.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ..., DEPARTMENT OF HOMELAND SECURITY INSURANCE AND HAZARD MITIGATION National Flood Insurance Program FLOOD MITIGATION ASSISTANCE § 78.9 Planning grant approval process. The State POC will evaluate and approve applications for Planning Grants. Funds will be provided only for the flood portion of any mitigation plan, and...

  16. 44 CFR 78.9 - Planning grant approval process.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ..., DEPARTMENT OF HOMELAND SECURITY INSURANCE AND HAZARD MITIGATION National Flood Insurance Program FLOOD MITIGATION ASSISTANCE § 78.9 Planning grant approval process. The State POC will evaluate and approve applications for Planning Grants. Funds will be provided only for the flood portion of any mitigation plan, and...

  17. 44 CFR 78.9 - Planning grant approval process.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ..., DEPARTMENT OF HOMELAND SECURITY INSURANCE AND HAZARD MITIGATION National Flood Insurance Program FLOOD MITIGATION ASSISTANCE § 78.9 Planning grant approval process. The State POC will evaluate and approve applications for Planning Grants. Funds will be provided only for the flood portion of any mitigation plan, and...

  18. Wide-area decontamination in an urban environment after radiological dispersion: A review and perspectives.

    PubMed

    Kaminski, Michael D; Lee, Sang Don; Magnuson, Matthew

    2016-03-15

    Nuclear or radiological terrorism in the form of uncontrolled radioactive contamination presents a unique challenge in the field of nuclear decontamination. Potential targets require an immediate decontamination response, or mitigation plan to limit the social and economic impact. To date, experience with urban decontamination of building materials - specifically hard, porous, external surfaces - is limited to nuclear weapon fallout and nuclear reactor accidents. Methods are lacking for performing wide-area decontamination in an urban environment so that in all release scenarios the area may be re-occupied without evaluation and/or restriction. Also lacking is experience in developing mitigation strategies, that is, methods of mitigating contamination and its resultant radiation dose in key areas during the immediate aftermath of an event and after lifesaving operations. To date, the tremendous strategy development effort primarily by the European community has focused on the recovery phase, which extends years beyond the release event. In this review, we summarize the methods and data collected over the past 70 years in the field of hard, external surface decontamination of radionuclide contaminations, with emphasis on methods suitable for response to radiological dispersal devices and their potentially unique physico-chemical characteristics. This review concludes that although a tremendous amount of work has been completed primarily by the European Community (EU) and the United Kingdom (UK), the few studies existing on each technique permit only very preliminary estimates of decontamination factors for various building materials and methods and extrapolation of those values for use in environments outside the EU and UK. This data shortage prevents us from developing an effective and detailed mitigation response plan and remediation effort. Perhaps most importantly, while the data available does include valuable information on the practical aspects of performing the various remediation methods including costs, coverage rates, manpower, pitfalls, etc., it lacks the details on lessons learned, best practices, and standard procedures, for instance, that would be required to develop a mitigation strategy. While the urban decontamination problem is difficult and there is much more research to do, the existing literature provides a framework for a response plan. Using this framework, in conjunction with computer modeling and relevant data collection, can lead to development of appropriate plans and exercises that would permit development of a mitigation and remediation response. Copyright © 2015 Elsevier B.V. All rights reserved.

  19. 75 FR 66319 - State Systems Advance Planning Document (APD) Process

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-28

    ...) equipment and services. The APD process was designed to mitigate financial risks, avoid incompatibilities... develop a General Systems Design (GSD). Implementation APD means a recorded plan of action to request Federal financial participation (FFP) in the costs of designing, developing and implementing the system...

  20. Disaster mitigation action plan: Digital media on improving accountability and community relationships

    NASA Astrophysics Data System (ADS)

    Adila, I.; Dewi, W. W. A.; Tamitiadini, D.; Syauki, W. R.

    2017-06-01

    This study wants to address on how communication science is applied to Disaster Mitigation Plan. Especially, the implementation of Community Media and Development of Communication Technology that synergize to create a Disaster Mitigation Medium, which is appropriate for typology of Indonesia. Various levels of priorities that include disaster mitigation information, namely, increasing chain system of early warning systems, building evacuation, improving alertness and capacity to face a disaster, as well as minimizing disaster risk factor. Through this concept, mitigation actions plan of Tulungagung Coastal areas is expected to be applied in other regions in Indonesia by BNPB (Badan Nasional Penanggulangan Bencana). Having this strategy to be implemented based on region characteristics, it is expected that risk reduction process can be run optimally. As a result, the strategy is known as Community-Based Disaster Risk Reduction (PRBBK), which means as the organized-efforts by society for pra-, during, and post- disaster by using available resources as much as possible to prevent, reduce, avoid, and recover from the impact of disasters. Therefore, this result can be a Pilot Project for BNBP Indonesia, as a government decisive attitude for the next steps in protecting people residing in the region prone to natural disasters all over Indonesia.

  1. New Activities of the U.S. National Tsunami Hazard Mitigation Program, Mapping and Modeling Subcommittee

    NASA Astrophysics Data System (ADS)

    Wilson, R. I.; Eble, M. C.

    2013-12-01

    The U.S. National Tsunami Hazard Mitigation Program (NTHMP) is comprised of representatives from coastal states and federal agencies who, under the guidance of NOAA, work together to develop protocols and products to help communities prepare for and mitigate tsunami hazards. Within the NTHMP are several subcommittees responsible for complimentary aspects of tsunami assessment, mitigation, education, warning, and response. The Mapping and Modeling Subcommittee (MMS) is comprised of state and federal scientists who specialize in tsunami source characterization, numerical tsunami modeling, inundation map production, and warning forecasting. Until September 2012, much of the work of the MMS was authorized through the Tsunami Warning and Education Act, an Act that has since expired but the spirit of which is being adhered to in parallel with reauthorization efforts. Over the past several years, the MMS has developed guidance and best practices for states and territories to produce accurate and consistent tsunami inundation maps for community level evacuation planning, and has conducted benchmarking of numerical inundation models. Recent tsunami events have highlighted the need for other types of tsunami hazard analyses and products for improving evacuation planning, vertical evacuation, maritime planning, land-use planning, building construction, and warning forecasts. As the program responsible for producing accurate and consistent tsunami products nationally, the NTHMP-MMS is initiating a multi-year plan to accomplish the following: 1) Create and build on existing demonstration projects that explore new tsunami hazard analysis techniques and products, such as maps identifying areas of strong currents and potential damage within harbors as well as probabilistic tsunami hazard analysis for land-use planning. 2) Develop benchmarks for validating new numerical modeling techniques related to current velocities and landslide sources. 3) Generate guidance and protocols for the production and use of new tsunami hazard analysis products. 4) Identify multistate collaborations and funding partners interested in these new products. Application of these new products will improve the overall safety and resilience of coastal communities exposed to tsunami hazards.

  2. 40 CFR 230.95 - Ecological performance standards.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... mitigation plan must contain performance standards that will be used to assess whether the project is... mitigation project, so that the project can be objectively evaluated to determine if it is developing into... verifiable. Ecological performance standards must be based on the best available science that can be measured...

  3. 40 CFR 230.95 - Ecological performance standards.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... mitigation plan must contain performance standards that will be used to assess whether the project is... mitigation project, so that the project can be objectively evaluated to determine if it is developing into... verifiable. Ecological performance standards must be based on the best available science that can be measured...

  4. 40 CFR 230.95 - Ecological performance standards.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... mitigation plan must contain performance standards that will be used to assess whether the project is... mitigation project, so that the project can be objectively evaluated to determine if it is developing into... verifiable. Ecological performance standards must be based on the best available science that can be measured...

  5. 40 CFR 230.95 - Ecological performance standards.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... mitigation plan must contain performance standards that will be used to assess whether the project is... mitigation project, so that the project can be objectively evaluated to determine if it is developing into... verifiable. Ecological performance standards must be based on the best available science that can be measured...

  6. Bigger is better: Improved nature conservation and economic returns from landscape-level mitigation

    PubMed Central

    Kennedy, Christina M.; Miteva, Daniela A.; Baumgarten, Leandro; Hawthorne, Peter L.; Sochi, Kei; Polasky, Stephen; Oakleaf, James R.; Uhlhorn, Elizabeth M.; Kiesecker, Joseph

    2016-01-01

    Impact mitigation is a primary mechanism on which countries rely to reduce environmental externalities and balance development with conservation. Mitigation policies are transitioning from traditional project-by-project planning to landscape-level planning. Although this larger-scale approach is expected to provide greater conservation benefits at the lowest cost, empirical justification is still scarce. Using commercial sugarcane expansion in the Brazilian Cerrado as a case study, we apply economic and biophysical steady-state models to quantify the benefits of the Brazilian Forest Code (FC) under landscape- and property-level planning. We find that FC compliance imposes small costs to business but can generate significant long-term benefits to nature: supporting 32 (±37) additional species (largely habitat specialists), storing 593,000 to 2,280,000 additional tons of carbon worth $69 million to $265 million ($ pertains to U.S. dollars), and marginally improving surface water quality. Relative to property-level compliance, we find that landscape-level compliance reduces total business costs by $19 million to $35 million per 6-year sugarcane growing cycle while often supporting more species and storing more carbon. Our results demonstrate that landscape-level mitigation provides cost-effective conservation and can be used to promote sustainable development. PMID:27419225

  7. Inclusion of climate change strategies in municipal Integrated Development Plans: A case from seven municipalities in Limpopo Province, South Africa

    PubMed Central

    2016-01-01

    The Intergovernmental Panel on Climate Change (IPCC) has made it clear that anthropogenic greenhouse gasses are the main cause of observed global warming that leads to climate change. Climate change is now a global reality. In the South African political set-up, local municipalities are the structures that are in direct contact with communities and they draw up Integrated Development Plans (IDPs), which are reviewed and upgraded annually. The article seeks to investigate the extent to which climate change adaptation and mitigation strategies are embedded IDPs in seven vulnerable municipalities in the Limpopo Province. The article conducted an in-depth content analysis of the IDPs of the seven municipalities and the results have revealed that these municipalities have not included adaptation and mitigation strategies adequately in their IDPs despite being the most vulnerable municipalities in the province. The article concludes that these municipalities have not as yet institutionalised climate change in their daily operations, planning and decision making. To this end, the paper recommends that local municipalities should include climate change adaptation and mitigation strategies in their IDPs.

  8. 44 CFR 78.11 - Minimum project eligibility criteria.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ..., DEPARTMENT OF HOMELAND SECURITY INSURANCE AND HAZARD MITIGATION National Flood Insurance Program FLOOD... activity in an approved Flood Mitigation Plan does not mean it meets FMA eligibility criteria. Projects... with the Flood Mitigation Plan; the type of project being proposed must be identified in the plan. (f...

  9. 44 CFR 78.11 - Minimum project eligibility criteria.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ..., DEPARTMENT OF HOMELAND SECURITY INSURANCE AND HAZARD MITIGATION National Flood Insurance Program FLOOD... activity in an approved Flood Mitigation Plan does not mean it meets FMA eligibility criteria. Projects... with the Flood Mitigation Plan; the type of project being proposed must be identified in the plan. (f...

  10. 44 CFR 78.11 - Minimum project eligibility criteria.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ..., DEPARTMENT OF HOMELAND SECURITY INSURANCE AND HAZARD MITIGATION National Flood Insurance Program FLOOD... activity in an approved Flood Mitigation Plan does not mean it meets FMA eligibility criteria. Projects... with the Flood Mitigation Plan; the type of project being proposed must be identified in the plan. (f...

  11. 44 CFR 78.11 - Minimum project eligibility criteria.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ..., DEPARTMENT OF HOMELAND SECURITY INSURANCE AND HAZARD MITIGATION National Flood Insurance Program FLOOD... activity in an approved Flood Mitigation Plan does not mean it meets FMA eligibility criteria. Projects... with the Flood Mitigation Plan; the type of project being proposed must be identified in the plan. (f...

  12. Hellsgate Big Game Winter Range Wildlife Mitigation Site Specific Management Plan for the Hellsgate Project.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Berger, Matthew T.; Judd, Steven L.

    This report contains a detailed site-specific management plan for the Hellsgate Winter Range Wildlife Mitigation Project. The report provides background information about the mitigation process, the review process, mitigation acquisitions, Habitat Evaluation Procedures (HEP) and mitigation crediting, current habitat conditions, desired future habitat conditions, restoration/enhancements efforts and maps.

  13. Carbon stocks of mangroves within the Zambezi River Delta, Mozambique

    Treesearch

    Christina E. Stringer; Carl C. Trettin; Stanley J. Zarnoch; Wenwu Tang

    2015-01-01

    Mangroves are well-known for their numerous ecosystem services, including storing a globally significant C pool. There is increasing interest in the inclusion of mangroves in national climate change mitigation and adaptation plans in developing nations as they become involved with incentive programs for climate change mitigation. The quality and precision of data...

  14. Optimizing spacecraft design - optimization engine development : progress and plans

    NASA Technical Reports Server (NTRS)

    Cornford, Steven L.; Feather, Martin S.; Dunphy, Julia R; Salcedo, Jose; Menzies, Tim

    2003-01-01

    At JPL and NASA, a process has been developed to perform life cycle risk management. This process requires users to identify: goals and objectives to be achieved (and their relative priorities), the various risks to achieving those goals and objectives, and options for risk mitigation (prevention, detection ahead of time, and alleviation). Risks are broadly defined to include the risk of failing to design a system with adequate performance, compatibility and robustness in addition to more traditional implementation and operational risks. The options for mitigating these different kinds of risks can include architectural and design choices, technology plans and technology back-up options, test-bed and simulation options, engineering models and hardware/software development techniques and other more traditional risk reduction techniques.

  15. A currency for offsetting energy development impacts: horse-trading sage-grouse on the open market.

    PubMed

    Doherty, Kevin E; Naugle, David E; Evans, Jeffrey S

    2010-04-28

    Biodiversity offsets provide a mechanism to compensate for unavoidable damages from new energy development as the U.S. increases its domestic production. Proponents argue that offsets provide a partial solution for funding conservation while opponents contend the practice is flawed because offsets are negotiated without the science necessary to backup resulting decisions. Missing in negotiations is a biologically-based currency for estimating sufficiency of offsets and a framework for applying proceeds to maximize conservation benefits. Here we quantify a common currency for offsets for greater sage-grouse (Centrocercus urophasianus) by estimating number of impacted birds at 4 levels of development commonly permitted. Impacts were indiscernible at 1-12 wells per 32.2 km(2). Above this threshold lek losses were 2-5 times greater inside than outside of development and bird abundance at remaining leks declined by -32 to -77%. Findings reiterated the importance of time-lags as evidenced by greater impacts 4 years after initial development. Clustering well locations enabled a few small leks to remain active inside of developments. Documented impacts relative to development intensity can be used to forecast biological trade-offs of newly proposed or ongoing developments, and when drilling is approved, anticipated bird declines form the biological currency for negotiating offsets. Monetary costs for offsets will be determined by true conservation cost to mitigate risks such as sagebrush tillage to other populations of equal or greater number. If this information is blended with landscape level conservation planning, the mitigation hierarchy can be improved by steering planned developments away from conservation priorities, ensuring compensatory mitigation projects deliver a higher return for conservation that equate to an equal number of birds in the highest priority areas, provide on-site mitigation recommendations, and provide a biologically based cost for mitigating unavoidable impacts.

  16. Results of the UCAR 2008 Forum on Climate Mitigation and Adaptation

    NASA Astrophysics Data System (ADS)

    Fellows, J.; Barron, E.

    2008-12-01

    Mayors, governors, and local decision makers are developing climate change action plans. They are not waiting for the federal carbon emission reduction debates to conclude (e.g., cap and trade or carbon tax legislation). Many of them are struggling with what should be in these plans, what they should be assuming about future weather and climate trends, and what the impact might be on their community and its infrastructure. In October 2008, the University Corporation for Atmospheric Research held a forum at its 2008 Members' Meeting that focused on the UCAR community's role in climate change adaptation and mitigation. Many of UCAR's 71 university members are involved in projects with local and regional decision makers struggling with planning for the future in the face of climate change. The forum focused on the following questions: 1. How are these projects working and what lessons have we learned? 2. What can our community can do to assist these partnerships (e.g., models and other tools, better information, training opportunities, outreach, sharing ideas, etc.)? 3. Can we help our nation deal more effectively with climate mitigation and adaptation by being more strategic with these partnerships (e.g., more coordination, creating packages of tools and information, creating common approaches to climate action plans, developing better communication tools, community strategic planning effort, etc.)? This presentation will provide a summary of the forum outcomes.

  17. Columbia River Basin Fish and Wildlife Program Annual Implementation Work Plan for Fiscal Year 1993.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    United States. Bonneville Power Administration; Northwest Power Planning Council; Columbia Basin Fish and Wildlife Authority

    1992-09-01

    The Columbia River Basin Fish and Wildlife Program (Program) was developed by the Northwest Power Planning Council (Council) in accordance with Public Law 96-501, the Pacific Northwest Electric Power Planning and Conservation Act (Act). The purpose of the Program is to guide the Bonneville Power Administration (BPA) and other Federal agencies in carrying out their responsibilities to protect, mitigate, and enhance fish and wildlife of the Columbia River Basin. The Annual Implementation World Plan (AIWP) presents BPA`s plans for implementing the Program during fiscal year (FY) 1993. The FY 1993 AIWP emphasizes continuation of 143 ongoing or projecting ongoing Programmore » projects, tasks, or task orders, most of which involve protection, mitigation, or enhancement of anadromous fishery resources. The FY 1993 AIWP also contains three new Program projects or tasks that are planned to start in FY 1993.« less

  18. RE-PLAN: An Extensible Software Architecture to Facilitate Disaster Response Planning

    PubMed Central

    O’Neill, Martin; Mikler, Armin R.; Indrakanti, Saratchandra; Tiwari, Chetan; Jimenez, Tamara

    2014-01-01

    Computational tools are needed to make data-driven disaster mitigation planning accessible to planners and policymakers without the need for programming or GIS expertise. To address this problem, we have created modules to facilitate quantitative analyses pertinent to a variety of different disaster scenarios. These modules, which comprise the REsponse PLan ANalyzer (RE-PLAN) framework, may be used to create tools for specific disaster scenarios that allow planners to harness large amounts of disparate data and execute computational models through a point-and-click interface. Bio-E, a user-friendly tool built using this framework, was designed to develop and analyze the feasibility of ad hoc clinics for treating populations following a biological emergency event. In this article, the design and implementation of the RE-PLAN framework are described, and the functionality of the modules used in the Bio-E biological emergency mitigation tool are demonstrated. PMID:25419503

  19. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Fraley, John J.; Marotz, Brian L.; DosSantos, Joseph M.

    In this document we present fisheries losses, mitigation alternatives, and recommendations to protect, mitigate, and enhance resident fish and aquatic habitat affected by the construction and operation of Hungry Horse Dam. This plan addresses six separate program measures in the 1987 Columbia Basin Fish and Wildlife Program. We designed the plan to be closely coordinated in terms of dam operations, funding, and activities with the Kerr Mitigation Plan presently before the Federal Energy Regulatory Commission. This document represents a mitigation plan for consideration by the Northwest Power Planning Council process; it is not an implementation plan. Flathead Lake is onemore » of the cleanest lakes of its size in the world. The exceptional water quality and unique native fisheries make the Flathead Lake/River system extremely valuable to the economy and quality of life in the basin. The recreational fishery in Flathead Lake has an estimated value of nearly eight million dollars annually. This mitigation process represents our best opportunity to reduce the impacts of hydropower in this valuable aquatic system and increase angling opportunity. We based loss estimates and mitigation alternatives on an extensive data base, agency reports, nationally and internationally peer-reviewed scientific articles, and an innovative biological model for Hungry Horse Reservoir and the Flathead River. We conducted an extensive, 14-month scoping and consultation process with agency representatives, representatives of citizen groups, and the general public. This consultation process helped identify issues, areas of agreement, areas of conflict, and advantages and disadvantages of mitigation alternatives. The results of the scoping and consultation process helped shape our mitigation plan. Our recommended plan is based firmly on principles of adaptive management and recognition of biological uncertainty. After we receive direction from the NPPC, we will add more detailed hypotheses and other features necessary for a long-term implementation plan.« less

  20. Risk Management for Human Support Technology Development

    NASA Technical Reports Server (NTRS)

    jones, Harry

    2005-01-01

    NASA requires continuous risk management for all programs and projects. The risk management process identifies risks, analyzes their impact, prioritizes them, develops and carries out plans to mitigate or accept them, tracks risks and mitigation plans, and communicates and documents risk information. Project risk management is driven by the project goal and is performed by the entire team. Risk management begins early in the formulation phase with initial risk identification and development of a risk management plan and continues throughout the project life cycle. This paper describes the risk management approach that is suggested for use in NASA's Human Support Technology Development. The first step in risk management is to identify the detailed technical and programmatic risks specific to a project. Each individual risk should be described in detail. The identified risks are summarized in a complete risk list. Risk analysis provides estimates of the likelihood and the qualitative impact of a risk. The likelihood and impact of the risk are used to define its priority location in the risk matrix. The approaches for responding to risk are either to mitigate it by eliminating or reducing the effect or likelihood of a risk, to accept it with a documented rationale and contingency plan, or to research or monitor the risk, The Human Support Technology Development program includes many projects with independently achievable goals. Each project must do independent risk management, considering all its risks together and trading them against performance, budget, and schedule. Since the program can succeed even if some projects fail, the program risk has a complex dependence on the individual project risks.

  1. Steps for Developing a School Emergency Management Plan. Helpful Hints for School Emergency Management. Volume 2, Issue 1

    ERIC Educational Resources Information Center

    US Department of Education, 2007

    2007-01-01

    The U.S. Department of Education's Office of Safe and Drug-Free Schools strongly encourages schools and school districts to develop emergency management plans within the context of the four phases of emergency management: prevention, mitigation, preparedness, response and recovery. In addition, schools should collaborate closely with police, fire…

  2. The impact of earthquakes on the city of Aigio in Greece. Urban planning as a factor in mitigating seismic damage.

    NASA Astrophysics Data System (ADS)

    Athanasopoulou, Evanthia; Despoiniadou, Varvara; Dritsos, Stefanos

    2008-07-01

    This paper examines the effects of the mortal earthquake on the city of Aigio in Greece in 1995, with particular focus on urbanization and planning policies. It is based on interviews with experts and surveys on damage to buildings following this earthquake. The analysis takes into account several factors, such as exact location, land use, construction period and the height of damaged buildings. Furthermore, the relationship between the seismic damage and the postseismic construction development of Aigio is examined and the conclusion is reached that the Greek urban planning system needs to be better organized to prepare for seismic damage. To this end, the paper recommends a five-point discussion agenda for applying local planning to seismic mitigation.

  3. Mitigating Nitrogen Deposition Impacts on Biodiversity in California: Generating Funding for Weed Management

    NASA Astrophysics Data System (ADS)

    Weiss, S. B.

    2013-12-01

    The impacts of atmospheric nitrogen deposition on biodiversity are widespread and profound; N-inputs have far exceeded any historical range of variability and are altering ecosystem structure and function worldwide. Overwhelming scientific evidence documents acute threats to numerous California ecosystems and imperiled species through increased growth of invasive annual grasses and forbs, yet policy responses lag far behind the science. Since 2001, a confluence of several projects (gas-fired powerplants and highway improvements) in Santa Clara County set powerful precedents for mitigation of N-deposition impacts on ecosystems via the Endangered Species Act, with a focus on the Bay checkerspot butterfly. These projects have culminated in the Santa Clara Valley Habitat Plan, a 50-year $665,000,000 mitigation plan to conserve and manage habitat for 19 target species. Elsewhere, powerplants in San Diego and Contra Costa Counties have provided mitigation funds for habitat restoration and weed management. Building on these precedents, the California Invasive Plant Council, California Native Plant Society, and other groups are forming a coalition to extend this mitigation across California to generate money for weed management. Key elements of this incipient campaign include: 1) education of regulatory agencies, activists, and decision-makers about the threat; 2) generation of standard EIR comments with project specifics for developments that increase traffic or generate nitrogen emissions; 3) encouraging state and federal wildlife agencies to raise the issue in consultations and Habitat Conservation Plans; 4) policy and legal research to chart a course through the regulatory and political landscape; 5) collating research on impacts and development of tools to document those impacts; 6) media outreach, and 7) coalition building. The main mitigation strategy is funding for local weed management and stewardship groups through fees. There is a desperate need for stable long-term funding of weed management on parks, preserves and other wildlands, and mitigating N-deposition could provide one major source.

  4. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Fred D. Brent; Lalit Shah; Earl Berry

    The overall objective of this project is the three phase development of an Early Entrance Coproduction Plant (EECP) which uses petroleum coke to produce at least one product from at least two of the following three categories: (1) electric power (or heat), (2) fuels, and (3) chemicals using ChevronTexaco's proprietary gasification technology. The objective of Phase I is to determine the feasibility and define the concept for the EECP located at a specific site; develop a Research, Development, and Testing (RD&T) Plan to mitigate technical risks and barriers; and prepare a Preliminary Project Financing Plan. The objective of Phase IImore » is to implement the work as outlined in the Phase I RD&T Plan to enhance the development and commercial acceptance of coproduction technology. The objective of Phase III is to develop an engineering design package and a financing and testing plan for an EECP located at a specific site. The project's intended result is to provide the necessary technical, economic, and environmental information needed by industry to move the EECP forward to detailed design, construction, and operation. The partners in this project are Texaco Energy Systems LLC or TES (a subsidiary of ChevronTexaco), General Electric (GE), Praxair, and Kellogg Brown & Root (KBR) in addition to the U.S. Department of Energy (DOE). TES is providing gasification technology and Fischer-Tropsch (F-T) technology developed by Rentech, GE is providing combustion turbine technology, Praxair is providing air separation technology, and KBR is providing engineering. Each of the EECP subsystems was assessed for technical risks and barriers. A plan was developed to mitigate the identified risks (Phase II RD&T Plan, October 2000). The potential technical and economic risks to the EECP from Task 2.5 can be mitigated by demonstrating that the end-use products derived from the upgrading of the F-T synthesis total liquid product can meet or exceed current specifications for the manufacture of ethylene and propylene chemicals from F-T naphtha, for the generation of hydrogen from F-T naphtha to power fuel cells, for direct blending of F-T diesels into transportation fuels, for the conversion of F-T heavy product wax to transportation fuels, and the conversion of F-T Heavy product wax to a valuable high melting point food-grade specialty wax product. Product evaluations conducted under Task 2.5 of Phase II successfully mitigated the above technical and economic risks to the EECP with the development of product yields and product qualities for the production of chemicals, transportation fuels, and specialty food-grade waxes from the F-T synthesis products.« less

  5. Mitigation for one & all: An integrated framework for mitigation of development impacts on biodiversity and ecosystem services

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Tallis, Heather, E-mail: htallis@tnc.org; Kennedy, Christina M., E-mail: ckennedy@tnc.org; Ruckelshaus, Mary

    Emerging development policies and lending standards call for consideration of ecosystem services when mitigating impacts from development, yet little guidance exists to inform this process. Here we propose a comprehensive framework for advancing both biodiversity and ecosystem service mitigation. We have clarified a means for choosing representative ecosystem service targets alongside biodiversity targets, identified servicesheds as a useful spatial unit for assessing ecosystem service avoidance, impact, and offset options, and discuss methods for consistent calculation of biodiversity and ecosystem service mitigation ratios. We emphasize the need to move away from area- and habitat-based assessment methods for both biodiversity and ecosystemmore » services towards functional assessments at landscape or seascape scales. Such comprehensive assessments more accurately reflect cumulative impacts and variation in environmental quality, social needs and value preferences. The integrated framework builds on the experience of biodiversity mitigation while addressing the unique opportunities and challenges presented by ecosystem service mitigation. These advances contribute to growing potential for economic development planning and execution that will minimize impacts on nature and maximize human wellbeing. - Highlights: • This is the first framework for biodiversity and ecosystem service mitigation. • Functional, landscape scale assessments are ideal for avoidance and offsets. • Servicesheds define the appropriate spatial extent for ecosystem service mitigation. • Mitigation ratios should be calculated consistently and based on standard factors. • Our framework meets the needs of integrated mitigation assessment requirements.« less

  6. Mitigation for the Construction and Operation of Libby Dam, 2004-2005 Annual Report.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Dunnigan, James; DeShazer, Jay; Garrow, Larry

    2005-06-01

    ''Mitigation for the Construction and Operation of Libby Dam'' is part of the Northwest Power and Conservation Council's (NPCC) resident fish and wildlife program. The program was mandated by the Northwest Planning Act of 1980, and is responsible for mitigating damages to fish and wildlife caused by hydroelectric development in the Columbia River Basin. The objective of Phase I of the project (1983 through 1987) was to maintain or enhance the Libby Reservoir fishery by quantifying seasonal water levels and developing ecologically sound operational guidelines. The objective of Phase II of the project (1988 through 1996) was to determine themore » biological effects of reservoir operations combined with biotic changes associated with an aging reservoir. The objectives of Phase III of the project (1996 through present) are to implement habitat enhancement measures to mitigate for dam effects, to provide data for implementation of operational strategies that benefit resident fish, monitor reservoir and river conditions, and monitor mitigation projects for effectiveness. This project completes urgent and high priority mitigation actions as directed by the Kootenai Subbasin Plan. Montana Fish, Wildlife & Parks (MFWP) uses a combination of techniques to collect physical and biological data within the Kootenai River Basin. These data serve several purposes including: the development and refinement of models used in management of water resources and operation of Libby Dam; investigations into the limiting factors of native fish populations, gathering basic life history information, tracking trends in endangered and threatened species, and the assessment of restoration or management activities designed to restore native fishes and their habitats.« less

  7. Mitigation for the Construction and Operation of Libby Dam, 2003-2004 Annual Report.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Dunnigan, James; DeShazer, Jay; Garrow, Larry

    2004-06-01

    ''Mitigation for the Construction and Operation of Libby Dam'' is part of the Northwest Power and Conservation Council's (NPCC) resident fish and wildlife program. The program was mandated by the Northwest Planning Act of 1980, and is responsible for mitigating for damages to fish and wildlife caused by hydroelectric development in the Columbia River Basin. The objective of Phase I of the project (1983 through 1987) was to maintain or enhance the Libby Reservoir fishery by quantifying seasonal water levels and developing ecologically sound operational guidelines. The objective of Phase II of the project (1988 through 1996) was to determinemore » the biological effects of reservoir operations combined with biotic changes associated with an aging reservoir. The objectives of Phase III of the project (1996 through present) are to implement habitat enhancement measures to mitigate for dam effects, to provide data for implementation of operational strategies that benefit resident fish, monitor reservoir and river conditions, and monitor mitigation projects for effectiveness. This project completes urgent and high priority mitigation actions as directed by the Kootenai Subbasin Plan. Montana FWP uses a combination of diverse techniques to collect a variety of physical and biological data within the Kootenai River Basin. These data serve several purposes including: the development and refinement of models used in management of water resources and operation of Libby Dam; investigations into the limiting factors of native fish populations, gathering basic life history information, tracking trends in endangered, threatened species, and the assessment of restoration or management activities intended to restore native fishes and their habitats.« less

  8. Wildlife and Wildlife Habitat Mitigation Plan for Hungry Horse Hydroelectric Project, Final Report.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bissell, Gael

    1985-01-01

    This report describes the proposed mitigation plan for wildlife losses attributable to the construction of the Hungry Horse hydroelectric project. In this report, mitigation objectives and alternatives, the recommended mitigation projects, and the crediting system for each project are described by each target species. Mitigation objectives for each species (group) were established based on the loss estimates but tailored to the recommended projects. 13 refs., 3 figs., 19 tabs.

  9. A dynamic model for costing disaster mitigation policies.

    PubMed

    Altay, Nezih; Prasad, Sameer; Tata, Jasmine

    2013-07-01

    The optimal level of investment in mitigation strategies is usually difficult to ascertain in the context of disaster planning. This research develops a model to provide such direction by relying on cost of quality literature. This paper begins by introducing a static approach inspired by Joseph M. Juran's cost of quality management model (Juran, 1951) to demonstrate the non-linear trade-offs in disaster management expenditure. Next it presents a dynamic model that includes the impact of dynamic interactions of the changing level of risk, the cost of living, and the learning/investments that may alter over time. It illustrates that there is an optimal point that minimises the total cost of disaster management, and that this optimal point moves as governments learn from experience or as states get richer. It is hoped that the propositions contained herein will help policymakers to plan, evaluate, and justify voluntary disaster mitigation expenditures. © 2013 The Author(s). Journal compilation © Overseas Development Institute, 2013.

  10. Human casualties in earthquakes: Modelling and mitigation

    USGS Publications Warehouse

    Spence, R.J.S.; So, E.K.M.

    2011-01-01

    Earthquake risk modelling is needed for the planning of post-event emergency operations, for the development of insurance schemes, for the planning of mitigation measures in the existing building stock, and for the development of appropriate building regulations; in all of these applications estimates of casualty numbers are essential. But there are many questions about casualty estimation which are still poorly understood. These questions relate to the causes and nature of the injuries and deaths, and the extent to which they can be quantified. This paper looks at the evidence on these questions from recent studies. It then reviews casualty estimation models available, and finally compares the performance of some casualty models in making rapid post-event casualty estimates in recent earthquakes.

  11. Meeting CCS communication challenges head-on: Integrating communications, planning, risk assessment, and project management

    USGS Publications Warehouse

    Greenberg, S.; Gauvreau, L.; Hnottavange-Telleen, K.; Finley, R.; Marsteller, S.

    2011-01-01

    The Midwest Geological Sequestration Consortium, Schlumberger Carbon Services, and Archer Daniels Midland has implemented a comprehensive communications plan at the Illinois Basin - Decatur Project (IBDP), a one million metric tonne Carbon Capture and Storage project in Decatur, IL, USA funded by the U.S. Department of Energy's National Energy Technology Laboratory. The IBDP Communication Plan includes consortium information, funding and disclaimer citations, description of target audiences, media communications guidelines, paper and presentations guidelines, site visit information, crisis communication, on-site photography regulations, and other components. The creation, development, and implementation processes for the IBDP Communication Plan (the Plan) are shared in this paper. New communications challenges, such as how to address add-on research requests, data sharing and management, scope increase, and contract agreements have arisen since the Plan was completed in January 2009, resulting in development of new policies and procedures by project management. Integrating communications planning, risk assessment, and project management ensured that consistent, factual information was developed and incorporated into project planning, and constitutes the basis of public communications. Successful integration has allowed the IBDP to benefit from early identification and mitigation of the potential project risks, which allows more time to effectively deal with unknown and unidentified risks that may arise. Project risks and risks associated with public perception can be managed through careful planning and integration of communication strategies into project management and risk mitigation. ?? 2011 Published by Elsevier Ltd.

  12. 44 CFR 78.6 - Flood Mitigation Plan approval process.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... approval process. 78.6 Section 78.6 Emergency Management and Assistance FEDERAL EMERGENCY MANAGEMENT AGENCY... MITIGATION ASSISTANCE § 78.6 Flood Mitigation Plan approval process. The State POC will forward all Flood... reasons for non-approval and offer suggestions for improvement. ...

  13. Designing climate change mitigation plans that add up.

    PubMed

    Bajželj, Bojana; Allwood, Julian M; Cullen, Jonathan M

    2013-07-16

    Mitigation plans to combat climate change depend on the combined implementation of many abatement options, but the options interact. Published anthropogenic emissions inventories are disaggregated by gas, sector, country, or final energy form. This allows the assessment of novel energy supply options, but is insufficient for understanding how options for efficiency and demand reduction interact. A consistent framework for understanding the drivers of emissions is therefore developed, with a set of seven complete inventories reflecting all technical options for mitigation connected through lossless allocation matrices. The required data set is compiled and calculated from a wide range of industry, government, and academic reports. The framework is used to create a global Sankey diagram to relate human demand for services to anthropogenic emissions. The application of this framework is demonstrated through a prediction of per-capita emissions based on service demand in different countries, and through an example showing how the "technical potentials" of a set of separate mitigation options should be combined.

  14. The influence of mitigation on sage-grouse habitat selection within an energy development field.

    PubMed

    Fedy, Bradley C; Kirol, Christopher P; Sutphin, Andrew L; Maechtle, Thomas L

    2015-01-01

    Growing global energy demands ensure the continued growth of energy development. Energy development in wildlife areas can significantly impact wildlife populations. Efforts to mitigate development impacts to wildlife are on-going, but the effectiveness of such efforts is seldom monitored or assessed. Greater sage-grouse (Centrocercus urophasianus) are sensitive to energy development and likely serve as an effective umbrella species for other sagebrush-steppe obligate wildlife. We assessed the response of birds within an energy development area before and after the implementation of mitigation action. Additionally, we quantified changes in habitat distribution and abundance in pre- and post-mitigation landscapes. Sage-grouse avoidance of energy development at large spatial scales is well documented. We limited our research to directly within an energy development field in order to assess the influence of mitigation in close proximity to energy infrastructure. We used nest-location data (n = 488) within an energy development field to develop habitat selection models using logistic regression on data from 4 years of research prior to mitigation and for 4 years following the implementation of extensive mitigation efforts (e.g., decreased activity, buried powerlines). The post-mitigation habitat selection models indicated less avoidance of wells (well density β = 0.18 ± 0.08) than the pre-mitigation models (well density β = -0.09 ± 0.11). However, birds still avoided areas of high well density and nests were not found in areas with greater than 4 wells per km2 and the majority of nests (63%) were located in areas with ≤ 1 well per km2. Several other model coefficients differed between the two time periods and indicated stronger selection for sagebrush (pre-mitigation β = 0.30 ± 0.09; post-mitigation β = 0.82 ± 0.08) and less avoidance of rugged terrain (pre-mitigation β = -0.35 ± 0.12; post-mitigation β = -0.05 ± 0.09). Mitigation efforts implemented may be responsible for the measurable improvement in sage-grouse nesting habitats within the development area. However, we cannot reject alternative hypotheses concerning the influence of population density and intraspecific competition. Additionally, we were unable to assess the actual fitness consequences of mitigation or the source-sink dynamics of the habitats. We compared the pre-mitigation and post-mitigation models predicted as maps with habitats ranked from low to high relative probability of use (equal-area bins: 1 - 5). We found more improvement in habitat rank between the two time periods around mitigated wells compared to non-mitigated wells. Informed mitigation within energy development fields could help improve habitats within the field. We recommend that any mitigation effort include well-informed plans to monitor the effectiveness of the implemented mitigation actions that assess both habitat use and relevant fitness parameters.

  15. 44 CFR 201.5 - Enhanced State Mitigation Plans.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 44 Emergency Management and Assistance 1 2014-10-01 2014-10-01 false Enhanced State Mitigation Plans. 201.5 Section 201.5 Emergency Management and Assistance FEDERAL EMERGENCY MANAGEMENT AGENCY... that the plan is integrated to the extent practicable with other State and/or regional planning...

  16. 44 CFR 201.5 - Enhanced State Mitigation Plans.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 44 Emergency Management and Assistance 1 2013-10-01 2013-10-01 false Enhanced State Mitigation Plans. 201.5 Section 201.5 Emergency Management and Assistance FEDERAL EMERGENCY MANAGEMENT AGENCY...) Demonstration that the plan is integrated to the extent practicable with other State and/or regional planning...

  17. 44 CFR 201.5 - Enhanced State Mitigation Plans.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 44 Emergency Management and Assistance 1 2010-10-01 2010-10-01 false Enhanced State Mitigation Plans. 201.5 Section 201.5 Emergency Management and Assistance FEDERAL EMERGENCY MANAGEMENT AGENCY...) Demonstration that the plan is integrated to the extent practicable with other State and/or regional planning...

  18. 44 CFR 201.5 - Enhanced State Mitigation Plans.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 44 Emergency Management and Assistance 1 2011-10-01 2011-10-01 false Enhanced State Mitigation Plans. 201.5 Section 201.5 Emergency Management and Assistance FEDERAL EMERGENCY MANAGEMENT AGENCY...) Demonstration that the plan is integrated to the extent practicable with other State and/or regional planning...

  19. Jennifer Daw | NREL

    Science.gov Websites

    , energy and water audits, greenhouse gas mitigation, energy-water-food nexus analysis and strategy planning, and asset management. Research Interests Energy-water-food nexus Sustainable development and

  20. A Currency for Offsetting Energy Development Impacts: Horse-Trading Sage-Grouse on the Open Market

    PubMed Central

    Doherty, Kevin E.; Naugle, David E.; Evans, Jeffrey S.

    2010-01-01

    Background Biodiversity offsets provide a mechanism to compensate for unavoidable damages from new energy development as the U.S. increases its domestic production. Proponents argue that offsets provide a partial solution for funding conservation while opponents contend the practice is flawed because offsets are negotiated without the science necessary to backup resulting decisions. Missing in negotiations is a biologically-based currency for estimating sufficiency of offsets and a framework for applying proceeds to maximize conservation benefits. Methodology/Principal Findings Here we quantify a common currency for offsets for greater sage-grouse (Centrocercus urophasianus) by estimating number of impacted birds at 4 levels of development commonly permitted. Impacts were indiscernible at 1–12 wells per 32.2 km2. Above this threshold lek losses were 2–5 times greater inside than outside of development and bird abundance at remaining leks declined by −32 to −77%. Findings reiterated the importance of time-lags as evidenced by greater impacts 4 years after initial development. Clustering well locations enabled a few small leks to remain active inside of developments. Conclusions/Significance Documented impacts relative to development intensity can be used to forecast biological trade-offs of newly proposed or ongoing developments, and when drilling is approved, anticipated bird declines form the biological currency for negotiating offsets. Monetary costs for offsets will be determined by true conservation cost to mitigate risks such as sagebrush tillage to other populations of equal or greater number. If this information is blended with landscape level conservation planning, the mitigation hierarchy can be improved by steering planned developments away from conservation priorities, ensuring compensatory mitigation projects deliver a higher return for conservation that equate to an equal number of birds in the highest priority areas, provide on-site mitigation recommendations, and provide a biologically based cost for mitigating unavoidable impacts. PMID:20442770

  1. Mitigating effects of vaccination on influenza outbreaks given constraints in stockpile size and daily administration capacity

    PubMed Central

    2011-01-01

    Background Influenza viruses are a major cause of morbidity and mortality worldwide. Vaccination remains a powerful tool for preventing or mitigating influenza outbreaks. Yet, vaccine supplies and daily administration capacities are limited, even in developed countries. Understanding how such constraints can alter the mitigating effects of vaccination is a crucial part of influenza preparedness plans. Mathematical models provide tools for government and medical officials to assess the impact of different vaccination strategies and plan accordingly. However, many existing models of vaccination employ several questionable assumptions, including a rate of vaccination proportional to the population at each point in time. Methods We present a SIR-like model that explicitly takes into account vaccine supply and the number of vaccines administered per day and places data-informed limits on these parameters. We refer to this as the non-proportional model of vaccination and compare it to the proportional scheme typically found in the literature. Results The proportional and non-proportional models behave similarly for a few different vaccination scenarios. However, there are parameter regimes involving the vaccination campaign duration and daily supply limit for which the non-proportional model predicts smaller epidemics that peak later, but may last longer, than those of the proportional model. We also use the non-proportional model to predict the mitigating effects of variably timed vaccination campaigns for different levels of vaccination coverage, using specific constraints on daily administration capacity. Conclusions The non-proportional model of vaccination is a theoretical improvement that provides more accurate predictions of the mitigating effects of vaccination on influenza outbreaks than the proportional model. In addition, parameters such as vaccine supply and daily administration limit can be easily adjusted to simulate conditions in developed and developing nations with a wide variety of financial and medical resources. Finally, the model can be used by government and medical officials to create customized pandemic preparedness plans based on the supply and administration constraints of specific communities. PMID:21806800

  2. Using Remote Sensing Data and Research Results for Urban Heat Island Mitigation

    NASA Technical Reports Server (NTRS)

    Estes, Maury; Luvall, Jeffrey

    1999-01-01

    This paper provides information on the characteristics of the urban heat island, research designed to provide the data needed to develop effective urban heat island reduction strategies, and the development of local working groups to develop implementation plans. As background, an overview of research results on the urban heat island phenomenon and the resultant effect on energy usage and air quality will be explored. The use of more reflective roofing materials, paving materials, tree planting, and other initiatives will be explored as a basis for strategies to mitigate urban heat islands and improve the urban environment. Current efforts to use aircraft remote sensing data in Atlanta, Baton Rouge, Sacramento, and Salt Lake City and our work with non-profit organizations designated to lead public education and strategic development efforts will be presented. Efforts to organize working groups comprised of key stakeholders, the process followed in communicating research results, and methodology for soliciting feedback and incorporating ideas into local plans, policies and decision-making will be discussed. Challenges in developing and transferring data products and research results to stakeholders will be presented. It is our ultimate goal that such efforts be integrated into plans and/or decision models that encourage sustainable development.

  3. Fiscal Year 2013 Trails Management Program Mitigation Action Plan Annual Report, October 2013

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Pava, Daniel S.

    This Trails Management Program Mitigation Action Plan Annual Report (Trails MAPAR) has been prepared for the Department of Energy (DOE)/National Nuclear Security Administration (NNSA) as part of implementing the 2003 Final Environmental Assessment for the Proposed Los Alamos National Laboratory Trails Management Program (DOE 2003). The Trails Mitigation Action Plan (MAP) is now a part of the Site-Wide Environmental Impact Statement for the Continued Operation of Los Alamos National Laboratory (DOE/EIS 0380) Mitigation Action Plan (2008 SWEIS MAP) (DOE 2008). The MAP provides guidance for the continued implementation of the Trails Management Program at Los Alamos National Laboratory (LANL) andmore » integration of future mitigation actions into the 2008 SWEIS MAP to decrease impacts associated with recreational trails use at LANL. This eighth MAPAR includes a summary of Trails Management Program activities and actions during Fiscal Year (FY) 2013, from October 2012 through September 2013.« less

  4. 75 FR 40846 - Agency Information Collection Activities: Submission for OMB Review; Comment Request, OMB No...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-14

    ...; State Administrative Plan for the Hazard Mitigation Grant Program AGENCY: Federal Emergency Management...: Collection of Information Title: State Administrative Plan for the Hazard Mitigation Grant Program. Type of... guide that details how the State will administer the Hazard Mitigation Grant Program (HMGP). An approved...

  5. Columbia Basin Wildlife Mitigation Project : Rainwater Wildlife Area Final Management Plan.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Childs, Allen

    This Draft Management Plan has been developed by the Confederated Tribes of the Umatilla Indian Reservation (CTUIR) to document how the Rainwater Wildlife Area (formerly known as the Rainwater Ranch) will be managed. The plan has been developed under a standardized planning process developed by the Bonneville Power Administration (BPA) for Columbia River Basin Wildlife Mitigation Projects (See Appendix A and Guiding Policies Section below). The plan outlines the framework for managing the project area, provides an assessment of existing conditions and key resource issues, and presents an array of habitat management and enhancement strategies. The plan culminates into amore » 5-Year Action Plan that will focus our management actions and prioritize funding during the Fiscal 2001-2005 planning period. This plan is a product of nearly two years of field studies and research, public scoping, and coordination with the Rainwater Advisory Committee. The committee consists of representatives from tribal government, state agencies, local government, public organizations, and members of the public. The plan is organized into several sections with Chapter 1 providing introductory information such as project location, purpose and need, project goals and objectives, common elements and assumptions, coordination efforts and public scoping, and historical information about the project area. Key issues are presented in Chapter 2 and Chapter 3 discusses existing resource conditions within the wildlife area. Chapter 4 provides a detailed presentation on management activities and Chapter 5 outlines a monitoring and evaluation plan for the project that will help assess whether the project is meeting the intended purpose and need and the goals and objectives. Chapter 6 displays the action plan and provides a prioritized list of actions with associated budget for the next five year period. Successive chapters contain appendices, references, definitions, and a glossary.« less

  6. Tiered on-the-ground implementation projects for Gulf of Mexico water quality improvements

    USDA-ARS?s Scientific Manuscript database

    Both the Gulf Hypoxia Action Plan for Reducing, Mitigating, and Controlling Hypoxia in the Northern Gulf of Mexico and Improving Water Quality in the Mississippi River Basin (USEPA 2008) and the GOMA Governors’ Action Plan II for Healthy and Resilient Coasts (GOMA 2009) call for the development and ...

  7. Messy Design: Organic Planning for Blended Learning

    ERIC Educational Resources Information Center

    Rankin, Andrea; Luzeckyj, Ann; Haggis, Jane; Gare, Callum

    2016-01-01

    In this paper we argue that a messy design process does not mitigate against sharing and transfer of artefacts across educational domains. In fact, such a process can aid in developing a model for learning and teaching that is reusable and authentic. We describe the planning and design of an integrated and interactive blended learning environment…

  8. Introduction to Software Product Line Adoption

    DTIC Science & Technology

    2005-09-01

    plans • improvement suggestions • risks and mitigation strategies • progress reports • risks and mitigation strategies • adoption plan • funding ... model • organization chart • product line concept of operations (CONOPS) • marketing plan • product proposals • acquisition strategy • organization risk

  9. Libby Mitigation Program, 2007 Annual Progress Report: Mitigation for the Construction and Operation of Libby Dam.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Dunnigan, James; DeShazer, J.; Garrow, L.

    Libby Reservoir was created under an International Columbia River Treaty between the United States and Canada for cooperative water development of the Columbia River Basin (Columbia River Treaty 1964). Libby Reservoir inundated 109 stream miles of the mainstem Kootenai River in the United States and Canada, and 40 miles of tributary streams in the U.S. that provided habitat for spawning, juvenile rearing, and migratory passage (Figure 1). The authorized purpose of the dam is to provide power (91.5%), flood control (8.3%), and navigation and other benefits (0.2%; Storm et al. 1982). The Pacific Northwest Power Act of 1980 recognized possiblemore » conflicts stemming from hydroelectric projects in the northwest and directed Bonneville Power Administration to 'protect, mitigate, and enhance fish and wildlife to the extent affected by the development and operation of any hydroelectric project of the Columbia River and its tributaries' (4(h)(10)(A)). Under the Act, the Northwest Power Planning Council was created and recommendations for a comprehensive fish and wildlife program were solicited from the region's federal, state, and tribal fish and wildlife agencies. Among Montana's recommendations was the proposal that research be initiated to quantify acceptable seasonal minimum pool elevations to maintain or enhance the existing fisheries (Graham et al. 1982). Research to determine how operations of Libby Dam affect the reservoir and river fishery and to suggest ways to lessen these effects began in May 1983. The framework for the Libby Reservoir Model (LRMOD) was completed in 1989. Development of Integrated Rule Curves (IRCs) for Libby Dam operation was completed in 1996 (Marotz et al. 1996). The Libby Reservoir Model and the IRCs continue to be refined (Marotz et al 1999). Initiation of mitigation projects such as lake rehabilitation and stream restoration began in 1996. The primary focus of the Libby Mitigation project now is to restore the fisheries and fish habitat in basin streams and lakes. 'Mitigation for the Construction and Operation of Libby Dam' is part of the Northwest Power and Conservation Council's (NPCC) resident fish and wildlife program. The program was mandated by the Northwest Planning Act of 1980, and is responsible for mitigating damages to fish and wildlife caused by hydroelectric development in the Columbia River Basin. The objective of Phase I of the project (1983 through 1987) was to maintain or enhance the Libby Reservoir fishery by quantifying seasonal water levels and developing ecologically sound operational guidelines. The objective of Phase II of the project (1988 through 1996) was to determine the biological effects of reservoir operations combined with biotic changes associated with an aging reservoir. The objectives of Phase III of the project (1996 through present) are to implement habitat enhancement measures to mitigate for dam effects, to provide data for implementation of operational strategies that benefit resident fish, monitor reservoir and river conditions, and monitor mitigation projects for effectiveness. This project completes urgent and high priority mitigation actions as directed by the Kootenai Subbasin Plan.« less

  10. Use of Artificial Burrows by Burrowing Owls (Athene cunicularia) at the HAMMER Facility on the U.S. Department of Energy Hanford Site

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Alexander, Amanda K.; Sackschewsky, Michael R.; Duberstein, Corey A.

    In 2003 the U.S. Department of Energy (DOE) constructed an Emergency Vehicle Operations Course (EVOC) at the Hazardous Material Management and Emergency Response Training and Education Center (HAMMER) in the southern portion of the Hanford Site. Preliminary surveys during 2001 identified an active burrowing owl (Athene cunicularia) burrow and three burrowing owls within the proposed development area. Burrowing owls were classified as a federal species of concern, a Washington State ?candidate? species, a Washington Department of Fish and Wildlife priority species, and a Hanford Site Biological Resources Management Plan Level III resource. Therefore, the mitigation action plan for the projectmore » included the installation of twenty artificial burrows around EVOC in the spring of 2003. The mitigation plan established a success criterion of five percent annual use of the burrows by owls. In July 2005, a field survey of the EVOC burrow complex was conducted to determine use and demography at each site. Burrow locations were mapped and signs of activity (feces, owl tracks, castings, feathers) were recorded. Out of the twenty burrows, twelve were found to be active. Of the eight inactive burrows three appeared to have been active earlier in the 2005 breeding season. A total of nineteen owls were counted but demography could not be determined. It appears that the EVOC mitigation exceeded burrow use goals during 2005. Continued site monitoring and maintenance, according to mitigation plan guidelines should be conducted as prescribed.« less

  11. The Influence of Mitigation on Sage-Grouse Habitat Selection within an Energy Development Field

    PubMed Central

    Fedy, Bradley C.; Kirol, Christopher P.; Sutphin, Andrew L.; Maechtle, Thomas L.

    2015-01-01

    Growing global energy demands ensure the continued growth of energy development. Energy development in wildlife areas can significantly impact wildlife populations. Efforts to mitigate development impacts to wildlife are on-going, but the effectiveness of such efforts is seldom monitored or assessed. Greater sage-grouse (Centrocercus urophasianus) are sensitive to energy development and likely serve as an effective umbrella species for other sagebrush-steppe obligate wildlife. We assessed the response of birds within an energy development area before and after the implementation of mitigation action. Additionally, we quantified changes in habitat distribution and abundance in pre- and post-mitigation landscapes. Sage-grouse avoidance of energy development at large spatial scales is well documented. We limited our research to directly within an energy development field in order to assess the influence of mitigation in close proximity to energy infrastructure. We used nest-location data (n = 488) within an energy development field to develop habitat selection models using logistic regression on data from 4 years of research prior to mitigation and for 4 years following the implementation of extensive mitigation efforts (e.g., decreased activity, buried powerlines). The post-mitigation habitat selection models indicated less avoidance of wells (well density β = 0.18 ± 0.08) than the pre-mitigation models (well density β = -0.09 ± 0.11). However, birds still avoided areas of high well density and nests were not found in areas with greater than 4 wells per km2 and the majority of nests (63%) were located in areas with ≤ 1 well per km2. Several other model coefficients differed between the two time periods and indicated stronger selection for sagebrush (pre-mitigation β = 0.30 ± 0.09; post-mitigation β = 0.82 ± 0.08) and less avoidance of rugged terrain (pre-mitigation β = -0.35 ± 0.12; post-mitigation β = -0.05 ± 0.09). Mitigation efforts implemented may be responsible for the measurable improvement in sage-grouse nesting habitats within the development area. However, we cannot reject alternative hypotheses concerning the influence of population density and intraspecific competition. Additionally, we were unable to assess the actual fitness consequences of mitigation or the source-sink dynamics of the habitats. We compared the pre-mitigation and post-mitigation models predicted as maps with habitats ranked from low to high relative probability of use (equal-area bins: 1 – 5). We found more improvement in habitat rank between the two time periods around mitigated wells compared to non-mitigated wells. Informed mitigation within energy development fields could help improve habitats within the field. We recommend that any mitigation effort include well-informed plans to monitor the effectiveness of the implemented mitigation actions that assess both habitat use and relevant fitness parameters. PMID:25835296

  12. Drainage network optimization for inundation mitigation case study of ITS Surabaya

    NASA Astrophysics Data System (ADS)

    Savitri, Yang Ratri; Lasminto, Umboro

    2017-06-01

    Institut Teknologi Sepuluh Nopember (ITS) Surabaya is one of engineering campus in Surabaya with an area of ± 187 ha, which consists of building and campus facilities. The campus is supported by drainage system planned according to the ITS Master Plan on 2002. The drainage system is planned with numbers of retention and detention pond based on the city concept of Zero Delta Q concept. However, in the rainy season, it frequently has inundation problems in several locations. The problems could be identified from two major sources, namely the internal campus facilities and external condition connected with the city drainage system. This paper described the capabilities of drainage network optimization to mitigate local urban drainage problem. The hydrology-hydraulic investigation was done by utilizing the Storm Water Management Model (SWMM) developed by US Environmental Protection Agency (EPA). The mitigation is based on several alternative that based on the existing condition and regarding the social problem. The study results showed that the management of the flow from external source could reduce final stored volume of the campus main channel by 31.75 %.

  13. Ecological impact assessments fail to reduce risk of bat casualties at wind farms.

    PubMed

    Lintott, Paul R; Richardson, Suzanne M; Hosken, David J; Fensome, Sophie A; Mathews, Fiona

    2016-11-07

    Demand for renewable energy is rising exponentially. While this has benefits in reducing greenhouse gas emissions, there may be costs to biodiversity [1]. Environmental Impact Assessments (EIAs) are the main tool used across the world to predict the overall positive and negative effects of renewable energy developments before planning consent is given, and the Ecological Impact Assessments (EcIAs) within them assess their species-specific effects. Given that EIAs are undertaken globally, are extremely expensive, and are enshrined in legislation, their place in evidence-based decision making deserves evaluation. Here we assess how well EIAs of wind-farm developments protect bats. We found they do not predict the risks to bats accurately, and even in those cases where high risk was correctly identified, the mitigation deployed did not avert the risk. Given that the primary purpose of an EIA is to make planning decisions evidence-based, our results indicate that EIA mitigation strategies used to date have been ineffective in protecting bats. In the future, greater emphasis should be placed on assessing the actual impacts post-construction and on developing effective mitigation strategies. Copyright © 2016 The Author(s). Published by Elsevier Ltd.. All rights reserved.

  14. A Suite of GIS-Based Tools for Siting Low Impact Development in an Urban Watershed

    EPA Science Inventory

    Low impact development (LID) -- a comprehensive land use planning and design approach with the goal of mitigating development impacts on hydrologic/nutrient cycles and ecosystems -- is increasingly being touted as an effective approach to lessen overland runoff and pollutant load...

  15. Identifying priority sites for low impact development (LID) in a mixed-use watershed

    EPA Science Inventory

    ABSTRACT: Low impact development (LID), a comprehensive land use planning and design approach with the goal of mitigating land development impacts to the environment, is increasingly being touted as an effective approach to lessen runoff and pollutant loadings to streams. Broad-s...

  16. Commercial Aircraft Integrated Vehicle Health Management Study

    NASA Technical Reports Server (NTRS)

    Reveley, Mary S.; Briggs, Jeffrey L.; Evans, Joni K.; Jones, Sharon Monica; Kurtoglu, Tolga; Leone, Karen M.; Sandifer, Carl E.; Thomas, Megan A.

    2010-01-01

    Statistical data and literature from academia, industry, and other government agencies were reviewed and analyzed to establish requirements for fixture work in detection, diagnosis, prognosis, and mitigation for IVHM related hardware and software. Around 15 to 20 percent of commercial aircraft accidents between 1988 and 2003 involved inalftfnctions or failures of some aircraft system or component. Engine and landing gear failures/malfunctions dominate both accidents and incidents. The IVI vl Project research technologies were found to map to the Joint Planning and Development Office's National Research and Development Plan (RDP) as well as the Safety Working Group's National Aviation Safety Strategic. Plan (NASSP). Future directions in Aviation Technology as related to IVHlvl were identified by reviewing papers from three conferences across a five year time span. A total of twenty-one trend groups in propulsion, aeronautics and aircraft categories were compiled. Current and ftiture directions of IVHM related technologies were gathered and classified according to eight categories: measurement and inspection, sensors, sensor management, detection, component and subsystem monitoring, diagnosis, prognosis, and mitigation.

  17. Status Review of Wildlife Mitigation at 14 of 27 Major Hydroelectric Projects in Idaho, 1983-1984 Final Report.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Martin, Robert C.; Mehrhoff, L.A.

    1985-01-01

    The Pacific Northwest Electric Power Planning and Conservation Act and wildlife and their habitats in the Columbia River Basin and to compliance with the Program, the wildlife mitigation status reports coordination with resource agencies and Indian Tribes. developed the Columbia River Basin Fish and Wildlife Program development, operation, and maintenance of hydroelectric projects on existing agreements; and past, current, and proposed wildlife factual review and documentation of existing information on wildlife meet the requirements of Measure 1004(b)(l) of the Program. The mitigation, enhancement, and protection activities were considered. In mitigate for the losses to those resources resulting from the purposemore » of these wildlife mitigation status reports is to provide a resources at some of the Columbia River Basin hydroelectric projects the river and its tributaries. To accomplish this goal, the Council were written with the cooperation of project operators, and in within Idaho.« less

  18. Reducing emissions from agriculture to meet the 2 °C target.

    PubMed

    Wollenberg, Eva; Richards, Meryl; Smith, Pete; Havlík, Petr; Obersteiner, Michael; Tubiello, Francesco N; Herold, Martin; Gerber, Pierre; Carter, Sarah; Reisinger, Andrew; van Vuuren, Detlef P; Dickie, Amy; Neufeldt, Henry; Sander, Björn O; Wassmann, Reiner; Sommer, Rolf; Amonette, James E; Falcucci, Alessandra; Herrero, Mario; Opio, Carolyn; Roman-Cuesta, Rosa Maria; Stehfest, Elke; Westhoek, Henk; Ortiz-Monasterio, Ivan; Sapkota, Tek; Rufino, Mariana C; Thornton, Philip K; Verchot, Louis; West, Paul C; Soussana, Jean-François; Baedeker, Tobias; Sadler, Marc; Vermeulen, Sonja; Campbell, Bruce M

    2016-12-01

    More than 100 countries pledged to reduce agricultural greenhouse gas (GHG) emissions in the 2015 Paris Agreement of the United Nations Framework Convention on Climate Change. Yet technical information about how much mitigation is needed in the sector vs. how much is feasible remains poor. We identify a preliminary global target for reducing emissions from agriculture of ~1 GtCO 2 e yr -1 by 2030 to limit warming in 2100 to 2 °C above pre-industrial levels. Yet plausible agricultural development pathways with mitigation cobenefits deliver only 21-40% of needed mitigation. The target indicates that more transformative technical and policy options will be needed, such as methane inhibitors and finance for new practices. A more comprehensive target for the 2 °C limit should be developed to include soil carbon and agriculture-related mitigation options. Excluding agricultural emissions from mitigation targets and plans will increase the cost of mitigation in other sectors or reduce the feasibility of meeting the 2 °C limit. © 2016 The Authors Global Change Biology Published by John Wiley & Sons Ltd.

  19. Coupling the Biophysical and Social Dimensions of Wildfire Risk to Improve Wildfire Mitigation Planning.

    PubMed

    Ager, Alan A; Kline, Jeffrey D; Fischer, A Paige

    2015-08-01

    We describe recent advances in biophysical and social aspects of risk and their potential combined contribution to improve mitigation planning on fire-prone landscapes. The methods and tools provide an improved method for defining the spatial extent of wildfire risk to communities compared to current planning processes. They also propose an expanded role for social science to improve understanding of community-wide risk perceptions and to predict property owners' capacities and willingness to mitigate risk by treating hazardous fuels and reducing the susceptibility of dwellings. In particular, we identify spatial scale mismatches in wildfire mitigation planning and their potential adverse impact on risk mitigation goals. Studies in other fire-prone regions suggest that these scale mismatches are widespread and contribute to continued wildfire dwelling losses. We discuss how risk perceptions and behavior contribute to scale mismatches and how they can be minimized through integrated analyses of landscape wildfire transmission and social factors that describe the potential for collaboration among landowners and land management agencies. These concepts are then used to outline an integrated socioecological planning framework to identify optimal strategies for local community risk mitigation and improve landscape-scale prioritization of fuel management investments by government entities. © 2015 Society for Risk Analysis.

  20. Construction of a New Fire Station, Demolition of Buildings 530 and 606 and Relocation of the Hazardous Cargo Area at Grand Forks Air Force Base, North Dakota. Finding of No Significant Impact (FOSNI). Finding of No Practical Alternative(FONPA)

    DTIC Science & Technology

    2009-09-23

    hawthorn, buffaloberry and snowberry also are found in the area. In wetland areas, predominant species include Typha sp., smartweed, wild millet, cord...does not straddle the airfield flight line fence. This location will require wetland mitigation for 0.03 wetlands determined to be jurisdictional by... wetlands construction or restoration at either a wetland mitigation bank or a suitable location on base. A formal mitigation plan will be developed

  1. Earth Sciences Data and Information System (ESDIS) program planning and evaluation methodology development

    NASA Technical Reports Server (NTRS)

    Dickinson, William B.

    1995-01-01

    An Earth Sciences Data and Information System (ESDIS) Project Management Plan (PMP) is prepared. An ESDIS Project Systems Engineering Management Plan (SEMP) consistent with the developed PMP is also prepared. ESDIS and related EOS program requirements developments, management and analysis processes are evaluated. Opportunities to improve the effectiveness of these processes and program/project responsiveness to requirements are identified. Overall ESDIS cost estimation processes are evaluated, and recommendations to improve cost estimating and modeling techniques are developed. ESDIS schedules and scheduling tools are evaluated. Risk assessment, risk mitigation strategies and approaches, and use of risk information in management decision-making are addressed.

  2. Feasibility of lane closures using probe data.

    DOT National Transportation Integrated Search

    2017-04-01

    To develop an adequate traffic operations management and congestion mitigation plan for every roadway : maintenance and construction project requiring lane closures, transportation agencies need accurate and : reliable estimates of traffic impacts as...

  3. A SYSTEMIC APPROACH TO MITIGATING URBAN STORM WATER RUNOFF VIA DEVELOPMENT PLANS BASED ON LAND SUITABILITY ANALYSIS

    EPA Science Inventory

    We advocate an approach to reduce the anticipated increase in stormwater runoff from conventional development by demonstrating a low-impact development that incorporates hydrologic factors into an expanded land suitability analysis. This methodology was applied to a 3 hectare exp...

  4. National Wetlands Mitigation Action Plan

    EPA Pesticide Factsheets

    On December 26, 2002, EPA and the Corps of Engineers announced the release of a comprehensive, interagency National Wetlands Mitigation Action Plan to further achievement of the goal of no net loss of wetlands.

  5. An Assessment of Institutional Capacity for Integrated Landscape Management in Eastern Cameroon.

    PubMed

    Brown, H Carolyn Peach

    2018-07-01

    Landscape approaches have become prominent in efforts to address issues of conservation and development through bringing together different actors and sectors, to reconcile diverse land uses, and promote synergies. Some have suggested that integrated landscape management approaches are consistent with the goals of REDD+ and offer a strategy to address multiple goals of climate change mitigation, biodiversity conservation, maintenance of ecosystem services, and socio-economic development. Institutional or governance arrangements have been shown to be a critical component in influencing outcomes in landscapes. Using diverse methodologies, this study investigated the capacity of institutions to support the planning, implementation, and resource mobilization needed to integrate climate change mitigation, conservation, and livelihood goals in a forest mosaic landscape in East Cameroon. Results showed that diverse institutions are present in the landscape, including institutions of relevant government agencies, local government, local non-government, the private sector, and hybrid institutions of conservation, development and research institutions. However, the overall institutional capacity for integrated landscape planning and management in the study area is limited, although some institutions exhibit increased capacity in some areas over others. Multiple strategies can be employed to build the necessary human, financial, and leadership capacity, and facilitate the institutional planning and coordination that is foundational to multi-stakeholder landscape governance. Given the complexity of integrating climate change mitigation, conservation and livelihood goals in a landscape, building such institutional capacity is a long term endeavour that requires sustained effort and ongoing financial, technical and human resource support.

  6. DEVELOPMENT OF A NATIONAL EMERGENCY PLAN FOR MEDICAL DIAGNOSTICS AND THERAPY OF DETERMINISTIC EFFECTS AFTER RADIATION ACCIDENTS.

    PubMed

    Ziegler, Andreas

    2016-09-01

    The focus of nuclear emergency planning in Austria has been so far on mitigating effects of widespread contamination (e.g. after NPP accidents); however, these plans did not contain provisions on the medical management of an acute radiation syndrome. To close this gap, a 'Medical Radiation Emergency Plan' was created in 2009 and 2011. This paper describes the development of this plan (including the selection of consulted guidance) as well as its structure and main propositions and closes with an outlook on probable enhancements for the second edition. © The Author 2016. Published by Oxford University Press. All rights reserved. For Permissions, please email: journals.permissions@oup.com.

  7. 76 FR 40320 - Risk Reduction Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-08

    ... identifying and analyzing applicable hazards and (2) develops plans to mitigate that risk. Each RRP is...-2009-0038] RIN 2130-AC11 Risk Reduction Program AGENCY: Federal Railroad Administration (FRA... certain railroads to develop a Risk Reduction Program (RRP). The Rail Safety Improvement Act of 2008...

  8. Rainwater Wildlife Area Management Plan : Executive Summary.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Childs, Allen B.; Confederated Tribes of the Umatilla Indian Reservation in Oregon.

    The purpose of the project is to protect, enhance, and mitigate fish and wildlife resources impacted by Columbia River Basin hydroelectric development. The effort is one of several wildlife mitigation projects in the region developed to compensate for terrestrial habitat losses resulting from the construction of McNary and John Day Hydroelectric facilities located on the mainstem Columbia River. While this project is driven primarily by the purpose and need to mitigate for wildlife habitat losses, it is also recognized that management strategies will also benefit many other non-target fish and wildlife species and associated natural resources. The Northwest Power Actmore » directs the NPPC to develop a program to ''protect, mitigate, and enhance'' fish and wildlife of the Columbia River and its tributaries. The overarching goals include: A Columbia River ecosystem that sustains an abundant, productive, and diverse community of fish and wildlife; Mitigation across the basin for the adverse effects to fish and wildlife caused by the development and operation of the hydrosystem; Sufficient populations of fish and wildlife for abundant opportunities for tribal trust and treaty right harvest and for non-tribal harvest; and Recovery of the fish and wildlife affected by the development and operation of the hydrosystem that are listed under the Endangered Species Act.« less

  9. Assessing Flood Risks and Planning for Resiliency in New Jersey: A Case Study on the Use of Online Flood Mapping and Resilience Planning Tools

    NASA Astrophysics Data System (ADS)

    Auermuller, L. M.; Gatto, J.; Huch, C.

    2015-12-01

    The highly developed nature of New Jersey's coastline, barrier island and lagoon communities make them particularly vulnerable to storm surge, sea level rise and flooding. The impacts of Hurricane Sandy have enlightened coastal communities to these realities. Recognizing these vulnerabilities, the Jacques Cousteau National Research Reserve (JC NERR), Rutgers Center for Remote Sensing and Spatial Analysis (CRSSA), Rutgers Bloustein School and the Barnegat Bay Partnership (BBP) have developed web-based tools to assist NJ's coastal communities in visualizing and planning for future local impacts. NJFloodMapper and NJAdapt are two complementary interactive mapping websites that visualize different current and future flood hazards. These hazard layers can be combined with additional data including critical facilities, evacuation routes, socioeconomic and environmental data. Getting to Resilience is an online self-assessment tool developed to assist communities reduce vulnerability and increase preparedness by linking planning, mitigation, and adaptation. Through this interactive process communities will learn how their preparedness can yield valuable points through voluntary programs like FEMA's Community Rating System and Sustainable Jersey. The assessment process can also increase the community's understanding of where future vulnerabilities should be addressed through hazard mitigation planning. Since Superstorm Sandy, more than thirty communities in New Jersey have been provided technical assistance in assessing their risks and vulnerabilities to coastal hazards, and have begun to understand how to better plan and prepare for short and long-term changes along their shorelines.

  10. Seagrass mitigation site modeling and assessment : [summary].

    DOT National Transportation Integrated Search

    2013-05-01

    As a result of awareness of wetlands importance, community master plans define areas to develop and others to preserve; however, sensitive coastal ecosystems can still suffer impacts, directly, through physical disturbance, or indirectly, by exces...

  11. Developing Legacy: Health Planning in the Host City of Porto Alegre for the 2014 Football World Cup.

    PubMed

    Witt, Regina Rigatto; Kotlhar, Mauro Kruter; Mesquita, Marilise Oliveira; Lima, Maria Alice Dias da Silva; Marin, Sandra Mara; Day, Carolina Baltar; Bandeira, Andrea Goncalves; Hutton, Alison

    2015-12-01

    To describe the process adopted to identify, classify, and evaluate legacy of health care planning in the host city of Porto Alegre for the Football World Cup 2014. There is an emerging interest in the need to demonstrate a sustainable health legacy from mass gatherings investments. Leaving a public health legacy for future host cities and countries is now an important part of planning for these events. The Ministry of Sports initiated and coordinated the development of projects in the host cities to identify actions, projects, and constructions to be developed to prepare for the World Cup. In Porto Alegre, a common structure was developed by the coordinating team to instruct legacy identification, classification, and evaluation. This structure was based on international documentary analysis (including official reports, policy documents, and web-based resources) and direct communication with recognized experts in the field. Sixteen total legacies were identified for health surveillance (5) and health services (11). They were classified according to the strategic area, organizations involved, dimension, typology, planned or unplanned, tangible or intangible, territorial coverage, and situation prior to the World Cup. Possible impacts were then assessed as positive, negative, and potentiating, and mitigating actions were indicated. The project allowed the identification, classification, and development of health legacy, including risk analysis, surveillance, mitigation measures, and provision of emergency medical care. Although the project intended the development of indicators to measure the identified legacies, evaluation was not possible at the time of publication due to time.

  12. Determining Coastal Hazards Risk Perception to Enhance Local Mitigation Planning through a Participatory Mapping Approach

    NASA Astrophysics Data System (ADS)

    Bethel, M.; Braud, D.; Lambeth, T.; Biber, P.; Wu, W.

    2017-12-01

    Coastal community leaders, government officials, and natural resource managers must be able to accurately assess and predict a given coastal landscape's sustainability and/or vulnerability as coastal habitat continues to undergo rapid and dramatic changes associated with natural and anthropogenic activities such as accelerated relative sea level rise (SLR). To help address this information need, a multi-disciplinary project team conducted Sea Grant sponsored research in Louisiana and Mississippi with traditional ecosystem users and natural resource managers to determine a method for producing localized vulnerability and sustainability maps for projected SLR and storm surge impacts, and determine how and whether the results of such an approach can provide more useful information to enhance hazard mitigation planning. The goals of the project are to develop and refine SLR visualization tools for local implementation in areas experiencing subsidence and erosion, and discover the different ways stakeholder groups evaluate risk and plan mitigation strategies associated with projected SLR and storm surge. Results from physical information derived from data and modeling of subsidence, erosion, engineered restoration and coastal protection features, historical land loss, and future land projections under SLR are integrated with complimentary traditional ecological knowledge (TEK) offered by the collaborating local ecosystem users for these assessments. The data analysis involves interviewing stakeholders, coding the interviews for themes, and then converting the themes into vulnerability and sustainability factors. Each factor is weighted according to emphasis by the TEK experts and number of experts who mention it to determine which factors are the highest priority. The priority factors are then mapped with emphasis on the perception of contributing to local community vulnerability or sustainability to SLR and storm surge. The maps are used by the collaborators to benefit local hazard mitigation and adaptation planning. The results to date in achieving the project objectives will be presented that include: analyses of scientific field data collected related to marsh vegetation biomass characteristics, analyses of TEK data collected, and mapping products developed.

  13. LEAD SAFE YARDS: DEVELOPING AND IMPLEMENTING A MONITORING, ASSESSMENT, AND OUTREACH PROGRAM FOR YOUR COMMUNITY

    EPA Science Inventory

    The USEPA has developed a technology transfer handbook on how to plan and implement a residential soil lead monitoring, assessment, mitigation and outreach program for residential communities. The handbook provides guidance on 1) identifying potentially impacted communities, 2) c...

  14. Risk Mitigation for the Development of the New Ariane 5 On-Board Computer

    NASA Astrophysics Data System (ADS)

    Stransky, Arnaud; Chevalier, Laurent; Dubuc, Francois; Conde-Reis, Alain; Ledoux, Alain; Miramont, Philippe; Johansson, Leif

    2010-08-01

    In the frame of the Ariane 5 production, some equipment will become obsolete and need to be redesigned and redeveloped. This is the case for the On-Board Computer, which has to be completely redesigned and re-qualified by RUAG Space, as well as all its on-board software and associated development tools by ASTRIUM ST. This paper presents this obsolescence treatment, which has started in 2007 under an ESA contract, in the frame of ACEP and ARTA accompaniment programmes, and is very critical in technical term but also from schedule point of view: it gives the context and overall development plan, and details the risk mitigation actions agreed with ESA, especially those related to the development of the input/output ASIC, and also the on-board software porting and revalidation strategy. The efficiency of these risk mitigation actions has been proven by the outcome schedule; this development constitutes an up-to-date case for good practices, including some experience report and feedback for future other developments.

  15. Preventing a data breach from becoming a disaster.

    PubMed

    Goldberg, Ed

    2013-01-01

    Organisations have traditionally dealt with data breaches by investing in protective measures without a great deal of attention to mitigation of breach consequences and response. Conversely, business continuity (BC) planning has traditionally focused on mitigating disasters, not on preventing them. From a BC planning perspective, organisations need to assume that a data breach is inevitable and plan accordingly. The spate of data breaches in these past few years hit many organisations that were well protected. Those that suffered disastrous consequences as a result of a data breach lacked effective mitigation and response, not protection. The complexity and speed of an effective data breach response require that detailed planning takes place in advance of a breach.

  16. Geospatial wetlands impacts and mitigation forecasting models.

    DOT National Transportation Integrated Search

    2017-06-30

    The South Carolina Department of Transportation (SCDOT) develops near (3-5 years) and long (15- 20 years) range plans for road widening, alignment, bridge replacement, and new road construction. Each road/bridge project may impact wetlands or streams...

  17. Designing a Standard Model for Development and Execution of an Analysis Project Plan

    DTIC Science & Technology

    2012-06-01

    mitigations set forth are agreeable to all parties involved. 1.3 Document Risks, Issues, and Constraints 1.1 Gather Information 1.2 Develop...parent requirement into lower level objective, performance-based sibling actions. Collective accomplishment of the set of derived “ sibling ” actions

  18. Case study: reconciling the quality and safety gap through strategic planning.

    PubMed

    Jeffs, Lianne; Merkley, Jane; Jeffrey, Jana; Ferris, Ella; Dusek, Janice; Hunter, Catherine

    2006-05-01

    An essential outcome of professional practice environments is the provision of high-quality, safe nursing care. To mitigate the quality and safety chasm, nursing leadership at St. Michael's Hospital undertook a strategic plan to enhance the nursing professional practice environment. This case study outlines the development of the strategic planning process: the driving forces (platform); key stakeholders (process and players); vision, guiding principles, strategic directions, framework for action and accountability (plan); lessons learned (pearls); and next steps to moving forward the vision, strategic directions and accountability mechanisms (passion and perseverance).

  19. The Influence of Drivers and Barriers on Urban Adaptation and Mitigation Plans-An Empirical Analysis of European Cities.

    PubMed

    Reckien, Diana; Flacke, Johannes; Olazabal, Marta; Heidrich, Oliver

    2015-01-01

    Cities are recognised as key players in global adaptation and mitigation efforts because the majority of people live in cities. However, in Europe, which is highly urbanized and one of the most advanced regions in terms of environmental policies, there is considerable diversity in the regional distribution, ambition and scope of climate change responses. This paper explores potential factors contributing to such diversity in 200 large and medium-sized cities across 11 European countries. We statistically investigate institutional, socio-economic, environmental and vulnerability characteristics of cities as potential drivers of or barriers to the development of urban climate change plans. Our results show that factors such as membership of climate networks, population size, GDP per capita and adaptive capacity act as drivers of mitigation and adaptation plans. By contrast, factors such as the unemployment rate, warmer summers, proximity to the coast and projected exposure to future climate impacts act as barriers. We see that, overall, it is predominantly large and prosperous cities that engage in climate planning, while vulnerable cities and those at risk of severe climate impacts in the future are less active. Our analysis suggests that climate change planning in European cities is not proactive, i.e. not significantly influenced by anticipated future impacts. Instead, we found that the current adaptive capacity of a city significantly relates to climate planning. Along with the need to further explore these relations, we see a need for more economic and institutional support for smaller and less resourceful cities and those at high risk from climate change impacts in the future.

  20. Managing Large Scale Project Analysis Teams through a Web Accessible Database

    NASA Technical Reports Server (NTRS)

    O'Neil, Daniel A.

    2008-01-01

    Large scale space programs analyze thousands of requirements while mitigating safety, performance, schedule, and cost risks. These efforts involve a variety of roles with interdependent use cases and goals. For example, study managers and facilitators identify ground-rules and assumptions for a collection of studies required for a program or project milestone. Task leaders derive product requirements from the ground rules and assumptions and describe activities to produce needed analytical products. Disciplined specialists produce the specified products and load results into a file management system. Organizational and project managers provide the personnel and funds to conduct the tasks. Each role has responsibilities to establish information linkages and provide status reports to management. Projects conduct design and analysis cycles to refine designs to meet the requirements and implement risk mitigation plans. At the program level, integrated design and analysis cycles studies are conducted to eliminate every 'to-be-determined' and develop plans to mitigate every risk. At the agency level, strategic studies analyze different approaches to exploration architectures and campaigns. This paper describes a web-accessible database developed by NASA to coordinate and manage tasks at three organizational levels. Other topics in this paper cover integration technologies and techniques for process modeling and enterprise architectures.

  1. MiniCLEAN-360: A liquid argon/neon dark matter detector

    NASA Astrophysics Data System (ADS)

    Rielage, Keith; DEAP/CLEAN Collaboration

    2008-11-01

    MiniCLEAN-360 utilizes 360 kg of liquid argon to detect the nuclear recoil from WIMP dark matter with a projected cross-section sensitivity of 10-45 cm2. To reach this planned sensitivity, a unique modular design is being developed with a spherical geometry to maximize light collection using PMTs. Pulse shape discrimination techniques separate nuclear recoil signal from the electron recoil backgrounds resulting from the beta decay of 39Ar and Compton scattering of gamma rays. The design allows for the replacement of the target material with liquid neon to examine any signal and backgrounds with a different sensitivity. It also provides research and development for a larger scale low energy solar neutrino experiment using neon (CLEAN: Cryogenic Low Energy Astrophysics with Noble gases) that plans to measure the pp-solar neutrino flux to 1%. Particular attention is being paid to mitigating the background from contamination of surfaces by radon daughters during assembly. The engineering design, radon mitigation plan, and various testing setups are presented. MiniCLEAN-360 anticipates the start of data collection in mid-2009 at SNOLAB in Sudbury, Ontario, Canada.

  2. Systematic testing of flood adaptation options in urban areas through simulations

    NASA Astrophysics Data System (ADS)

    Löwe, Roland; Urich, Christian; Sto. Domingo, Nina; Mark, Ole; Deletic, Ana; Arnbjerg-Nielsen, Karsten

    2016-04-01

    While models can quantify flood risk in great detail, the results are subject to a number of deep uncertainties. Climate dependent drivers such as sea level and rainfall intensities, population growth and economic development all have a strong influence on future flood risk, but future developments can only be estimated coarsely. In such a situation, robust decision making frameworks call for the systematic evaluation of mitigation measures against ensembles of potential futures. We have coupled the urban development software DAnCE4Water and the 1D-2D hydraulic simulation package MIKE FLOOD to create a framework that allows for such systematic evaluations, considering mitigation measures under a variety of climate futures and urban development scenarios. A wide spectrum of mitigation measures can be considered in this setup, ranging from structural measures such as modifications of the sewer network over local retention of rainwater and the modification of surface flow paths to policy measures such as restrictions on urban development in flood prone areas or master plans that encourage compact development. The setup was tested in a 300 ha residential catchment in Melbourne, Australia. The results clearly demonstrate the importance of considering a range of potential futures in the planning process. For example, local rainwater retention measures strongly reduce flood risk a scenario with moderate increase of rain intensities and moderate urban growth, but their performance strongly varies, yielding very little improvement in situations with pronounced climate change. The systematic testing of adaptation measures further allows for the identification of so-called adaptation tipping points, i.e. levels for the drivers of flood risk where the desired level of flood risk is exceeded despite the implementation of (a combination of) mitigation measures. Assuming a range of development rates for the drivers of flood risk, such tipping points can be translated into anticipated time spans over which a measure will be effective. While the new simulation setup is limited to situations where the planner is able to define realistic ranges for the development of drivers of flood risk, it certainly contributes to an improved consideration of deep uncertainties in the planning process. Future work will particularly focus on the application of the framework in a variety of urban development contexts.

  3. An optimization model for regional air pollutants mitigation based on the economic structure adjustment and multiple measures: A case study in Urumqi city, China.

    PubMed

    Sun, Xiaowei; Li, Wei; Xie, Yulei; Huang, Guohe; Dong, Changjuan; Yin, Jianguang

    2016-11-01

    A model based on economic structure adjustment and pollutants mitigation was proposed and applied in Urumqi. Best-worst case analysis and scenarios analysis were performed in the model to guarantee the parameters accuracy, and to analyze the effect of changes of emission reduction styles. Results indicated that pollutant-mitigations of electric power industry, iron and steel industry, and traffic relied mainly on technological transformation measures, engineering transformation measures and structure emission reduction measures, respectively; Pollutant-mitigations of cement industry relied mainly on structure emission reduction measures and technological transformation measures; Pollutant-mitigations of thermal industry relied mainly on the four mitigation measures. They also indicated that structure emission reduction was a better measure for pollutants mitigation of Urumqi. Iron and steel industry contributed greatly in SO2, NOx and PM (particulate matters) emission reduction and should be given special attention in pollutants emission reduction. In addition, the scales of iron and steel industry should be reduced with the decrease of SO2 mitigation amounts. The scales of traffic and electric power industry should be reduced with the decrease of NOx mitigation amounts, and the scales of cement industry and iron and steel industry should be reduced with the decrease of PM mitigation amounts. The study can provide references of pollutants mitigation schemes to decision-makers for regional economic and environmental development in the 12th Five-Year Plan on National Economic and Social Development of Urumqi. Copyright © 2016 Elsevier Ltd. All rights reserved.

  4. NASA's Research in Aircraft Vulnerability Mitigation

    NASA Technical Reports Server (NTRS)

    Allen, Cheryl L.

    2005-01-01

    Since its inception in 1958, the National Aeronautics and Space Administration s (NASA) role in civil aeronautics has been to develop high-risk, high-payoff technologies to meet critical national aviation challenges. Following the events of Sept. 11, 2001, NASA recognized that it now shared the responsibility for improving homeland security. The NASA Strategic Plan was modified to include requirements to enable a more secure air transportation system by investing in technologies and collaborating with other agencies, industry, and academia. NASA is conducting research to develop and advance innovative and commercially viable technologies that will reduce the vulnerability of aircraft to threats or hostile actions, and identify and inform users of potential vulnerabilities in a timely manner. Presented in this paper are research plans and preliminary status for mitigating the effects of damage due to direct attacks on civil transport aircraft. The NASA approach to mitigation includes: preventing loss of an aircraft due to a hit from man-portable air defense systems; developing fuel system technologies that prevent or minimize in-flight vulnerability to small arms or other projectiles; providing protection from electromagnetic energy attacks by detecting directed energy threats to aircraft and on/off-board systems; and minimizing the damage due to high-energy attacks (explosions and fire) by developing advanced lightweight, damage-resistant composites and structural concepts. An approach to preventing aircraft from being used as weapons of mass destruction will also be discussed.

  5. Taking Risk Assessment and Management to the Next Level: Program-Level Risk Analysis to Enable Solid Decision-Making on Priorities and Funding

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Nelson, J. G.; Morton, R. L.; Castillo, C.

    2011-02-01

    A multi-level (facility and programmatic) risk assessment was conducted for the facilities in the Nevada National Security Site (NNSS) Readiness in Technical Base and Facilities (RTBF) Program and results were included in a new Risk Management Plan (RMP), which was incorporated into the fiscal year (FY) 2010 Integrated Plans. Risks, risk events, probability, consequence(s), and mitigation strategies were identified and captured, for most scope areas (i.e., risk categories) during the facilitated risk workshops. Risk mitigations (i.e., efforts in addition to existing controls) were identified during the facilitated risk workshops when the risk event was identified. Risk mitigation strategies fell intomore » two broad categories: threats or opportunities. Improvement projects were identified and linked to specific risks they mitigate, making the connection of risk reduction through investments for the annual Site Execution Plan. Due to the amount of that was collected, analysis to be performed, and reports to be generated, a Risk Assessment/ Management Tool (RAMtool) database was developed to analyze the risks in real-time, at multiple levels, which reinforced the site-level risk management process and procedures. The RAMtool database was developed and designed to assist in the capturing and analysis of the key elements of risk: probability, consequence, and impact. The RAMtool calculates the facility-level and programmatic-level risk factors to enable a side-by-side comparison to see where the facility manager and program manager should focus their risk reduction efforts and funding. This enables them to make solid decisions on priorities and funding to maximize the risk reduction. A more active risk management process was developed where risks and opportunities are actively managed, monitored, and controlled by each facility more aggressively and frequently. risk owners have the responsibility and accountability to manage their assigned risk in real-time, using the RAMtool database.« less

  6. Visual Impairment/Intracranial Pressure Risk Assessment

    NASA Technical Reports Server (NTRS)

    Fogarty, Jennifer A.; Durham, T.; Otto, C.; Grounds, D.; Davis, J. R.

    2010-01-01

    Since 2006 there have been 6 reported cases of altered visual acuity and intracranial pressure (ICP) in long duration astronauts. In order to document this risk and develop an integrated approach to its mitigation, the NASA Space Life Sciences Directorate (SLSD) and Human Research Program (HRP) have chosen to use the Human System Risk Board (HSRB) and the risk management analysis tool (RMAT). The HSRB is the venue in which the stakeholders and customers discuss and vet the evidence and the RMAT is the tool that facilitates documentation and comparison of the evidence across mission profiles as well as identification of risk factors, and documentation of mitigation strategies. This process allows for information to be brought forward and dispositioned so that it may be properly incorporated into the RMAT and contribute to the design of the research and mitigation plans. The evidence thus far has resulted in the identification of a visual impairment/intracranial pressure (VIIP) project team, updating of both short and long duration medical requirements designed to assess visual acuity, and a research plan to characterize this issue further. In order to understand this issue more completely, a plan to develop an Accelerated Research Collaboration (ARC) has been approved by the HSRB. The ARC is a novel research model pioneered by the Myelin Repair Foundation. It is a patient centered research model that brings together researchers and clinicians, under the guidance of a scientific advisory panel, to collaborate and produce results much quickly than accomplished through traditional research models. The data and evidence from the updated medical requirements and the VIIP ARC will be reviewed at the HSRB on a regular basis. Each review package presented to the HSRB will include an assessment and recommendation with respect to continuation of research, countermeasure development, occupational surveillance modalities, selection criteria, etc. This process will determine the course of the VIIP project and ultimately how SLSD and HRP mitigate this emerging human health and performance risk.

  7. Interpreting federal policy at the local level: the wildland-urban interface concept in wildfire protection planning in the eastern United States

    Treesearch

    Stephanie A. Grayzeck-Souter; Kristen C. Nelson; Rachel F. Brummel; Pamela Jakes; Daniel R. Williams

    2009-01-01

    In 2003, the Healthy Forests Restoration Act (HFRA) called for USA communities at risk of wildfire to develop Community Wildfire Protection Plans (CWPPs) requiring local, state and federal actors to work together to address hazardous fuels reduction and mitigation efforts. CWPPs can provide the opportunity for local government to influence actions on adjacent public...

  8. 7T Magnetization Transfer and Chemical Exchange Saturation Transfer MRI of Cortical Gray Matter: Can We Detect Neurochemical and Macromolecular Abnormalities?

    DTIC Science & Technology

    2014-10-21

    measures working memory • Trail making test (both A and B): measures planning/executive function • "Black Box” (choice reaction time, critical flicker ...associated with SIR imaging. The former of these was mitigated by developing a novel B+ and !1B insensitive in- version composite pulse (Fig. 2) and...employing a low-flip angle TFE readout; the latter was mitigated by the efficiency of the TFE readout along with additional protocol optimization

  9. Coupling the biophysical and social dimensions of wildfire risk to improve wildfire mitigation planning

    Treesearch

    Alan A. Ager; Jeffrey D. Kline; A. Paige Fisher

    2015-01-01

    We describe recent advances in biophysical and social aspects of risk and their potential combined contribution to improve mitigation planning on fire-prone landscapes. The methods and tools provide an improved method for defining the spatial extent of wildfire risk to communities compared to current planning processes. They also propose an expanded role for social...

  10. Resilience Mitigation Financing Webinar for Water and Wastewater Utilities

    EPA Pesticide Factsheets

    The Resilience Mitigation Financing for Water and Wastewater Utilities webinar focuses on tools and financing resources to conduct resilience planning and to mitigate impacts before a disaster strikes.

  11. Managing Research in a Risk World

    NASA Technical Reports Server (NTRS)

    Anton, W.; Havenhill, M.

    2014-01-01

    The Office of Chief Medical Officer (OCHMO) owns all human health and performance risks managed by the Human System Risk Board (HSRB). While the HSRB manages the risks, the Human Research Program (HRP) manages the research portion of the overall risk mitigation strategy for these risks. The HSRB manages risks according to a process that identifies and analyzes risks, plans risk mitigation and tracks and reviews the implementation of these strategies according to its decisions pertaining to the OCHMO risk posture. HRP manages risk research work using an architecture that describes evidence-based risks, gaps in our knowledge about characterizing or mitigating the risk, and the tasks needed to produce deliverables to fill the gaps and reduce the risk. A planning schedule reflecting expected research milestones is developed, and as deliverables and new evidence are generated, research progress is tracked via the Path to Risk Reduction (PRR) that reflects a risk's research plan for a design reference mission. HRP's risk research process closely interfaces with the HSRB risk management process. As research progresses, new deliverables and evidence are used by the HSRB in conjunction with other operational and non-research evidence to inform decisions pertaining to the likelihood and consequence of the risk and risk posture. Those decisions in turn guide forward work for research as it contributes to overall risk mitigation strategies. As HRP tracks its research work, it aligns its priorities by assessing the effectiveness of its contributions and maintaining specific core competencies that would be invaluable for future work for exploration missions.

  12. Overview of the NASA Systems Approach to Crashworthiness Program

    NASA Technical Reports Server (NTRS)

    Jones, Lisa E.

    2002-01-01

    The NASA Aviation Safety Program was developed in response to the federal government's goal to reduce the fatal accident rate for aviation by 80% within 10 years. Accident Mitigation is a primary element of the Aviation Safety Program. The overall Accident Mitigation goal is to provide technology to the air transport industry to enable a decrease in the rate of fatalities and injury from crash loads and from in-flight and post-crash explosion and/or fire. Accident Mitigation is divided into two main elements - Fire Prevention and Systems Approach to Crashworthiness. The Systems Approach to Crashworthiness goal is to develop and promote technology that will increase the human survival rate or reduce the fatality rate in survivable accidents. The technical background and planning, selected technical activities, and summary of future efforts will be presented in this paper.

  13. 48 CFR 9.504 - Contracting officer responsibilities.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ..., contracting officers shall analyze planned acquisitions in order to— (1) Identify and evaluate potential..., or mitigate significant potential conflicts before contract award. (b) Contracting officers should... potential conflicts and in developing any necessary solicitation provisions and contract clauses (see 9.506...

  14. Rainfall-triggered landslides, anthropogenic hazards, and mitigation strategies

    USGS Publications Warehouse

    Larsen, M.C.

    2008-01-01

    Rainfall-triggered landslides are part of a natural process of hillslope erosion that can result in catastrophic loss of life and extensive property damage in mountainous, densely populated areas. As global population expansion on or near steep hillslopes continues, the human and economic costs associated with landslides will increase. Landslide hazard mitigation strategies generally involve hazard assessment mapping, warning systems, control structures, and regional landslide planning and policy development. To be sustainable, hazard mitigation requires that management of natural resources is closely connected to local economic and social interests. A successful strategy is dependent on a combination of multi-disciplinary scientific and engineering approaches, and the political will to take action at the local community to national scale.

  15. Risk evaluation and mitigation strategies for drugs with abuse liability: public interest, special interest, conflicts of interest, and the industry perspective.

    PubMed

    Wright, Curtis; Schnoll, Sidney; Bernstein, David

    2008-10-01

    Risk evaluation and mitigation strategies (REMS) formerly known as Risk Minimization Action Plans (RiskMAPs) are a regulatory technique for dealing with anticipated risks of new medications and are especially important for new drugs with abuse potential. This paper describes the origin and history of risk-management plans for drugs that might be abused, the proper use of these plans in minimizing the risk to the public, and the special difficulties inherent in managing risks for drugs with abuse potential. Drugs with abuse liability are distinctive since the risks inherent in manufacture and distribution include not only risks to patients prescribed the medications, but also risks to the general public including subgroups in the population not intended to get the drug and who receive no medical benefit from the medication. The crafting of risk-management plans intended to protect nonpatient populations is unique for these products. The content, extent, and level of intensity of these plans affect areas of medical ethics, civil liability, and criminal prosecution. The need for risk-management plans for drugs with abuse liability can potentially act as a deterrent to investment and is a factor in decisions concerning the development of new medications for the treatments of pain, ADHD, anxiety disorders, and addictions. This paper provides a framework for moving the process of REMS development forward and criteria for evaluating the probity and adequacy of such programs.

  16. A Global Mitigation Hierarchy for Nature Conservation

    PubMed Central

    Bull, Joseph W; Addison, Prue F E; Burgass, Michael J; Gianuca, Dimas; Gorham, Taylor M; Jacob, Céline; Watson, James E M; Wilcox, Chris; Milner-Gulland, E J

    2018-01-01

    Abstract Efforts to conserve biodiversity comprise a patchwork of international goals, national-level plans, and local interventions that, overall, are failing. We discuss the potential utility of applying the mitigation hierarchy, widely used during economic development activities, to all negative human impacts on biodiversity. Evaluating all biodiversity losses and gains through the mitigation hierarchy could help prioritize consideration of conservation goals and drive the empirical evaluation of conservation investments through the explicit consideration of counterfactual trends and ecosystem dynamics across scales. We explore the challenges in using this framework to achieve global conservation goals, including operationalization and monitoring and compliance, and we discuss solutions and research priorities. The mitigation hierarchy's conceptual power and ability to clarify thinking could provide the step change needed to integrate the multiple elements of conservation goals and interventions in order to achieve successful biodiversity outcomes. PMID:29731513

  17. GIS as a vital tool for Environmental Impact Assessment and Mitigation

    NASA Astrophysics Data System (ADS)

    Gharehbaghi, Koorosh; Scott-Young, Christina

    2018-03-01

    Environmental Impact Assessment (EIA) is a course of action which provides information to various stakeholders such as planners and relevant authorities about the planned development and its subsequent effects of the environment and the immediate ambiances. Furthermore, the EIA and mitigation are the inclusive process of collecting, analyzing information and the determination of the application for development or construction approval, which could be accessible by the concerned communities and organizations. Although the set regulations of EIA and mitigation vary from jurisdictions, they are, however, very precise and need to be integrated with the specific geographical data. In addition, the Geographical Information System (GIS) is a software intended to encapsulate and present all types of physical, biological, environmental, ecological and geological information. Conversely, GIS is the integration of statistical analysis and information technology, and can also be further broken down into two different categories of; Topological Modelling and Map overlay. To ensure that the EIA and mitigation are receptive the GIS will provide the decisive apparatus. Using GIS not only improves the overall EIA and mitigation process, but also provides valuable mapping strategies, including holistic environmental system approach. Accordingly, the main objective of this paper is to discuss the importance of the GIS and Environmental Data integration progression, to further enhance the overall EIA and Mitigation processes.

  18. Policy Development for Biodiversity Offsets: A Review of Offset Frameworks

    NASA Astrophysics Data System (ADS)

    McKenney, Bruce A.; Kiesecker, Joseph M.

    2010-01-01

    Biodiversity offsets seek to compensate for residual environmental impacts of planned developments after appropriate steps have been taken to avoid, minimize or restore impacts on site. Offsets are emerging as an increasingly employed mechanism for achieving net environmental benefits, with offset policies being advanced in a wide range of countries (i.e., United States, Australia, Brazil, Colombia, and South Africa). To support policy development for biodiversity offsets, we review a set of major offset policy frameworks—US wetlands mitigation, US conservation banking, EU Natura 2000, Australian offset policies in New South Wales, Victoria, and Western Australia, and Brazilian industrial and forest offsets. We compare how the frameworks define offset policy goals, approach the mitigation process, and address six key issues for implementing offsets: (1) equivalence of project impacts with offset gains; (2) location of the offset relative to the impact site; (3) “additionality” (a new contribution to conservation) and acceptable types of offsets; (4) timing of project impacts versus offset benefits; (5) offset duration and compliance; and (6) “currency” and mitigation replacement ratios. We find substantial policy commonalities that may serve as a sound basis for future development of biodiversity offsets policy. We also identify issues requiring further policy guidance, including how best to: (1) ensure conformance with the mitigation hierarchy; (2) identify the most environmentally preferable offsets within a landscape context; and (3) determine appropriate mitigation replacement ratios.

  19. Policy development for biodiversity offsets: a review of offset frameworks.

    PubMed

    McKenney, Bruce A; Kiesecker, Joseph M

    2010-01-01

    Biodiversity offsets seek to compensate for residual environmental impacts of planned developments after appropriate steps have been taken to avoid, minimize or restore impacts on site. Offsets are emerging as an increasingly employed mechanism for achieving net environmental benefits, with offset policies being advanced in a wide range of countries (i.e., United States, Australia, Brazil, Colombia, and South Africa). To support policy development for biodiversity offsets, we review a set of major offset policy frameworks-US wetlands mitigation, US conservation banking, EU Natura 2000, Australian offset policies in New South Wales, Victoria, and Western Australia, and Brazilian industrial and forest offsets. We compare how the frameworks define offset policy goals, approach the mitigation process, and address six key issues for implementing offsets: (1) equivalence of project impacts with offset gains; (2) location of the offset relative to the impact site; (3) "additionality" (a new contribution to conservation) and acceptable types of offsets; (4) timing of project impacts versus offset benefits; (5) offset duration and compliance; and (6) "currency" and mitigation replacement ratios. We find substantial policy commonalities that may serve as a sound basis for future development of biodiversity offsets policy. We also identify issues requiring further policy guidance, including how best to: (1) ensure conformance with the mitigation hierarchy; (2) identify the most environmentally preferable offsets within a landscape context; and (3) determine appropriate mitigation replacement ratios.

  20. Mapping suitability of rice production systems for mitigation: Strategic approach for prioritizing improved irrigation management across scales

    NASA Astrophysics Data System (ADS)

    Wassmann, Reiner; Sander, Bjoern Ole

    2016-04-01

    After the successful conclusion of the COP21 in Paris, many developing countries are now embracing the task of reducing emissions with much vigor than previously. In many countries of South and South-East Asia, the agriculture sector constitutes a vast share of the national GHG budget which can mainly be attributed to methane emissions from flooded rice production. Thus, rice growing countries are now looking for tangible and easily accessible information as to how to reduce emissions from rice production in an efficient manner. Given present and future food demand, mitigation options will have to comply with aim of increasing productivity. At the same time, limited financial resources demand for strategic planning of potential mitigation projects based on cost-benefit ratios. At this point, the most promising approach for mitigating methane emissions from rice is an irrigation technique called Alternate Wetting and Drying (AWD). AWD was initially developed for saving water and subsequently, represents an adaptation strategy in its own right by coping with less rainfall. Moreover, AWD also reduces methane emissions in a range from 30-70%. However, AWD is not universally suitable. It is attractive to farmers who have to pump water and may save fuel under AWD, but renders limited incentives in situations where there is no real pressing water scarcity. Thus, planning for AWD adoption at larger scale, e.g. for country-wide programs, should be based on a systematic prioritization of target environments. This presentation encompasses a new methodology for mapping suitability of water-saving in rice production - as a means for planning adaptation and mitigation programs - alongside with preliminary results. The latter comprises three new GIS maps on climate-driven suitability of AWD in major rice growing countries (Philippines, Vietnam, Bangladesh). These maps have been derived from high-resolution data of the areal and temporal extent of rice production that are now available for most Asian countries. These GIS maps have been expanded by adding relevant data on climate and soil texture to assess the water balance at any given point (in space and time). In the next step, these water balances (available in 10d intervals) have been integrated over the entire season to determine the climate-driven suitability for AWD implementation. These new GIS maps are vital for policy makers and other stakeholders who are now faced with the challenge of developing mitigation programs. The GIS data bases could further be expanded by more GIS layers on irrigation specific information (e.g. use of pumps) as well as on other mitigation approaches such as improved post-harvest technologies for preventing straw burning.

  1. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Benioff, R.; Ness, E.; Hirst, J.

    Under its Support for National Action Plans (SNAP) initiative, the U.S. Country Studies Program is providing financial and technical assistance to 18 countries for the development of climate change action plans. Although most of the countries have not yet completed their plans, the important lessons learned thus far are valuable and should be shared with other countries and international institutions that have an interest in the process of action plan development. This interim report describes the experience of 11 countries that are the furthest along in their planning activity and who have offered to share their results to date withmore » the larger community of interested nations. These action plans delineate specific mitigation and adaptation measures that the countries will implement and integrate into their ongoing development programs. This report focuses on the measures the countries have selected and the methods they used to prepare their action plans. This executive summary presents key lessons and common themes using a structure similar to that used in the individual country chapters.« less

  2. The Influence of Drivers and Barriers on Urban Adaptation and Mitigation Plans—An Empirical Analysis of European Cities

    PubMed Central

    Reckien, Diana; Flacke, Johannes

    2015-01-01

    Cities are recognised as key players in global adaptation and mitigation efforts because the majority of people live in cities. However, in Europe, which is highly urbanized and one of the most advanced regions in terms of environmental policies, there is considerable diversity in the regional distribution, ambition and scope of climate change responses. This paper explores potential factors contributing to such diversity in 200 large and medium-sized cities across 11 European countries. We statistically investigate institutional, socio-economic, environmental and vulnerability characteristics of cities as potential drivers of or barriers to the development of urban climate change plans. Our results show that factors such as membership of climate networks, population size, GDP per capita and adaptive capacity act as drivers of mitigation and adaptation plans. By contrast, factors such as the unemployment rate, warmer summers, proximity to the coast and projected exposure to future climate impacts act as barriers. We see that, overall, it is predominantly large and prosperous cities that engage in climate planning, while vulnerable cities and those at risk of severe climate impacts in the future are less active. Our analysis suggests that climate change planning in European cities is not proactive, i.e. not significantly influenced by anticipated future impacts. Instead, we found that the current adaptive capacity of a city significantly relates to climate planning. Along with the need to further explore these relations, we see a need for more economic and institutional support for smaller and less resourceful cities and those at high risk from climate change impacts in the future. PMID:26317420

  3. Human Health Countermeasures (HHC) Element Management Plan: Human Research Program. Revision B

    NASA Technical Reports Server (NTRS)

    Norsk, Peter; Baumann, David

    2012-01-01

    NASA s Human Research Program (HRP) is an applied research and technology program within the Human Exploration and Operations Mission Directorate (HEOMD) that addresses human health and performance risk mitigation strategies in support of exploration missions. The HRP research and technology development is focused on the highest priority risks to crew health and safety with the goal of ensuring mission success and maintaining long-term crew health. Crew health and performance standards, defined by the NASA Chief Health and Medical Officer (CHMO), set the acceptable risk level for exploration missions. The HRP conducts research to inform these standards as well as provide deliverables, such as countermeasures, that ensure standards can be met to maximize human performance and mission success. The Human Health Countermeasures (HHC) Element was formed as part of the HRP to develop a scientifically-based, integrated approach to understanding and mitigating the health risks associated with human spaceflight. These health risks have been organized into four research portfolios that group similar or related risks. A fifth portfolio exists for managing technology developments and infrastructure projects. The HHC Element portfolios consist of: a) Vision and Cardiovascular; b) Exercise and Performance; c) Multisystem; d) Bone; and e) Technology and Infrastructure. The HHC identifies gaps associated with the health risks and plans human physiology research that will result in knowledge required to more fully understand risks and will result in validated countermeasures to mitigate risks.

  4. Transportation Safety Data and Analysis : volume 3 framework for highway safety mitigation and workforce development.

    DOT National Transportation Integrated Search

    2011-05-01

    Safety has always been an important component in the planning, design, and operation of highways. In an effort : to reduce crashes occurring on highway facilities, the Safe, Accountable, Flexible, and Efficient Transportation : Equity Act - A Legacy ...

  5. Transportation safety data and analysis : Volume 3, Framework for highway safety mitigation and workforce development.

    DOT National Transportation Integrated Search

    2011-05-01

    Safety has always been an important component in the planning, design, and operation of highways. In an effort : to reduce crashes occurring on highway facilities, the Safe, Accountable, Flexible, and Efficient Transportation : Equity Act - A Legacy ...

  6. The use of air bags for mitigating grade crossing and trespass accidents : literature review and research plan.

    DOT National Transportation Integrated Search

    2016-06-01

    This literature review will confirm prior work in the use of locomotive airbag technologies for vehicle or pedestrian collision : mitigation, and to focus planned activities and tasks for this research. The state of the art in relevant technologies h...

  7. HYPOXIA IN THE NORTHERN GULF OF MEXICO: DOES THE SCIENCE SUPPORT THE PLAN TO REDUCE, MITIGATE, AND CONTROL HYPOXIA?

    EPA Science Inventory

    We update and reevaluate the scientific information on the distribution, history and causes of continental shelf hypoxia that supports the 2001 "Action Plan for Reducing, Mitigating, and Controlling Hypoxiain the Northern Gulf of Mexico," incorporating data, publications, and res...

  8. 300 Area Building Retention Evaluation Mitigation Plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    D. J. McBride

    2007-07-03

    Evaluate the long-term retention of several facilities associated with the PNNL Capability Replacement Laboratory and other Hanfor mission needs. WCH prepared a mitigation plan for three scenarios with different release dates for specific buildings. The evaluations present a proposed plan for providing utility services to retained facilities in support of a long-term (+20 year) lifespan in addition to temporary services to buildings with specified delayed release dates.

  9. Overview of NASA's Thermal Control System Development for Exploration Project

    NASA Technical Reports Server (NTRS)

    Stephan, Ryan A.

    2011-01-01

    The now-cancelled Constellation Program included the Orion, Altair, and Lunar Surface Systems project offices. The first two elements, Orion and Altair, were planned to be manned space vehicles while the third element was much more diverse and included several sub-elements. Among other things, these sub-elements were Rovers and a Lunar Habitat. The planned missions involving these systems and vehicles included several risks and design challenges. Due to the unique thermal operating environment, many of these risks and challenges were associated with the vehicles thermal control system. NASA s Exploration Technology Development Program (ETDP) consisted of various technology development projects. The project chartered with mitigating the aforementioned thermal risks and design challenges was the Thermal Control System Development for Exploration Project. These risks and design challenges were being addressed through a rigorous technology development process that was planned to culminate with an integrated thermal control system test. Although the technologies being developed were originally aimed towards mitigating specific Constellation risks, the technology development process is being continued within a new program. This continued effort is justified by the fact that many of the technologies are generically applicable to future spacecraft thermal control systems. The current paper summarizes the development efforts being performed by the technology development project. The development efforts involve heat acquisition and heat rejection hardware including radiators, heat exchangers, and evaporators. The project has also been developing advanced phase change material heat sinks and performing a material compatibility assessment for a promising thermal control system working fluid. The to-date progress and lessons-learned from these development efforts will be discussed throughout the paper.

  10. Cumulative biological impacts framework for solar energy projects in the California Desert

    USGS Publications Warehouse

    Davis, Frank W.; Kreitler, Jason R.; Soong, Oliver; Stoms, David M.; Dashiell, Stephanie; Hannah, Lee; Wilkinson, Whitney; Dingman, John

    2013-01-01

    This project developed analytical approaches, tools and geospatial data to support conservation planning for renewable energy development in the California deserts. Research focused on geographical analysis to avoid, minimize and mitigate the cumulative biological effects of utility-scale solar energy development. A hierarchical logic model was created to map the compatibility of new solar energy projects with current biological conservation values. The research indicated that the extent of compatible areas is much greater than the estimated land area required to achieve 2040 greenhouse gas reduction goals. Species distribution models were produced for 65 animal and plant species that were of potential conservation significance to the Desert Renewable Energy Conservation Plan process. These models mapped historical and projected future habitat suitability using 270 meter resolution climate grids. The results were integrated into analytical frameworks to locate potential sites for offsetting project impacts and evaluating the cumulative effects of multiple solar energy projects. Examples applying these frameworks in the Western Mojave Desert ecoregion show the potential of these publicly-available tools to assist regional planning efforts. Results also highlight the necessity to explicitly consider projected land use change and climate change when prioritizing areas for conservation and mitigation offsets. Project data, software and model results are all available online.

  11. Vulnerability of port and harbor communities to earthquake and tsunami hazards: The use of GIS in community hazard planning

    USGS Publications Warehouse

    Wood, Nathan J.; Good, James W.

    2004-01-01

    AbstractEarthquakes and tsunamis pose significant threats to Pacific Northwest coastal port and harbor communities. Developing holistic mitigation and preparedness strategies to reduce the potential for loss of life and property damage requires community-wide vulnerability assessments that transcend traditional site-specific analyses. The ability of a geographic information system (GIS) to integrate natural, socioeconomic, and hazards information makes it an ideal assessment tool to support community hazard planning efforts. This article summarizes how GIS was used to assess the vulnerability of an Oregon port and harbor community to earthquake and tsunami hazards, as part of a larger risk-reduction planning initiative. The primary purposes of the GIS were to highlight community vulnerability issues and to identify areas that both are susceptible to hazards and contain valued port and harbor community resources. Results of the GIS analyses can help decision makers with limited mitigation resources set priorities for increasing community resiliency to natural hazards.

  12. Tsunami Preparedness, Response, Mitigation, and Recovery Planning in California

    NASA Astrophysics Data System (ADS)

    Miller, K.; Wilson, R. I.; Johnson, L. A.; Mccrink, T. P.; Schaffer, E.; Bower, D.; Davis, M.

    2016-12-01

    In California officials of state, federal, and local governments have coordinated to implement a Tsunami Preparedness and Mitigation Program. Building upon past preparedness efforts carried out year-round this group has leveraged government support at all levels. A primary goal is for everyone who lives at or visits the coast to understand basic life-safety measures when responding to official tsunami alerts or natural warnings. Preparedness actions include: observation of National Tsunami Preparedness Week, local "tsunami walk" drills, scenario-based exercises, testing of notification systems for public alert messaging, outreach materials, workshops, presentations, and media events.Program partners have worked together to develop emergency operations, evacuation plans, and tsunami annexes to plans for counties, cities, communities, and harbors in 20 counties along the coast. Working with the state and federal partner agencies, coastal communities have begun to incorporate sophisticated tsunami "Playbook" scenario information into their planning. These innovative tsunami evacuation and response tools provide detailed evacuation maps and associated real-time response information for identifying areas where flooding could occur. This is critical information for evacuating populations on land, near the shoreline.Acting on recommendations from the recent USGS-led, multi-discipline Science Application for Risk Reduction Tsunami Scenario report on impacts to California and American Society of Civil Engineering adoption proposals to the International Building Code, the state has begun to develop a strategy to incorporate probabilistic tsunami findings into state level policy recommendations for addressing building code adoption, as well as approach land use planning and building code implementation in local jurisdictions. Additional efforts, in the context of sustained community resiliency, include developing recovery planning guidance for local communities.

  13. Fly-by-light flight control system technology development plan

    NASA Technical Reports Server (NTRS)

    Chakravarty, A.; Berwick, J. W.; Griffith, D. M.; Marston, S. E.; Norton, R. L.

    1990-01-01

    The results of a four-month, phased effort to develop a Fly-by-Light Technology Development Plan are documented. The technical shortfalls for each phase were identified and a development plan to bridge the technical gap was developed. The production configuration was defined for a 757-type airplane, but it is suggested that the demonstration flight be conducted on the NASA Transport Systems Research Vehicle. The modifications required and verification and validation issues are delineated in this report. A detailed schedule for the phased introduction of fly-by-light system components has been generated. It is concluded that a fiber-optics program would contribute significantly toward developing the required state of readiness that will make a fly-by-light control system not only cost effective but reliable without mitigating the weight and high-energy radio frequency related benefits.

  14. A bird’s-eye view: Land-use planning and assessments in Oregon and Washington

    Treesearch

    Marie Oliver; Andrew Gray

    2015-01-01

    Developing forest lands and agricultural lands for other uses has wide-ranging implications. Land development can affect production from forest and agricultural lands, wildlife habitat quality, the spread of invasive species, water quality, wildfire control, and infrastructure costs. In its attempts to mitigate these effects, Oregon implemented statewide land-use...

  15. Applying the Land Use Portfolio Model with Hazus to analyse risk from natural hazard events

    USGS Publications Warehouse

    Dinitz, Laura B.; Taketa, Richard A.

    2013-01-01

    This paper describes and demonstrates the integration of two geospatial decision-support systems for natural-hazard risk assessment and management. Hazus is a risk-assessment tool developed by the Federal Emergency Management Agency to identify risks and estimate the severity of risk from natural hazards. The Land Use Portfolio Model (LUPM) is a risk-management tool developed by the U.S. Geological Survey to evaluate plans or actions intended to reduce risk from natural hazards. We analysed three mitigation policies for one earthquake scenario in the San Francisco Bay area to demonstrate the added value of using Hazus and the LUPM together. The demonstration showed that Hazus loss estimates can be input to the LUPM to obtain estimates of losses avoided through mitigation, rates of return on mitigation investment, and measures of uncertainty. Together, they offer a more comprehensive approach to help with decisions for reducing risk from natural hazards.

  16. Isla Hispaniola: A trans-boundary flood risk mitigation plan

    NASA Astrophysics Data System (ADS)

    Brandimarte, Luigia; Brath, Armando; Castellarin, Attilio; Baldassarre, Giuliano Di

    It is sadly known that over the past decades Isla Hispaniola (Haiti and the Dominican Republic) has been exposed to the devastating passage of several hurricanes and tropical storms. Territories that are economically weak and extremely poor in terms of natural resources have been shaken by severe flood events that caused the loss of thousands of human lives, displacement of people and damage to the environment. On May 24th 2004, the flooding of the trans-boundary river Soliette killed over 1000 Haitian and Dominican people, wiping out villages and leaving behind desolation and poverty. After this catastrophic flood event, the General Direction for Development and Cooperation of the Italian Department of Foreign Affairs funded through the Istituto Italo-Latino Americano (IILA, www.iila.org) an international cooperation initiative (ICI), coordinated and directed by the University of Bologna. The ICI involved Haitian and Dominican institutions and was twofold: (a) institutional capacity building on flood risk management and mitigation measures and policies; (b) hydrological and hydraulic analysis of the May 2004 flood event aimed at formulating a suitable and affordable flood risk mitigation plan, consisting of structural and non-structural measures.

  17. 40 CFR 51.860 - Mitigation of air quality impacts.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 2 2010-07-01 2010-07-01 false Mitigation of air quality impacts. 51... Federal Actions to State or Federal Implementation Plans § 51.860 Mitigation of air quality impacts. Link... mitigate air quality impacts must be identified and the process for implementation and enforcement of such...

  18. Grand Coulee Dam Wildlife Mitigation Program : Pygmy Rabbit Programmatic Management Plan, Douglas County, Washington.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ashley, Paul

    1992-06-01

    The Northwest Power Planning Council and the Bonneville Power Administration approved the pygmy rabbit project as partial mitigation for impacts caused by the construction of Grand Coulee Dam. The focus of this project is the protection and enhancement of shrub-steppe/pygmy rabbit habitat in northeastern Washington.

  19. Emergency planning and preparedness for the deliberate release of toxic industrial chemicals.

    PubMed

    Russell, David; Simpson, John

    2010-03-01

    Society in developed and developing countries is hugely dependent upon chemicals for health, wealth, and economic prosperity, with the chemical industry contributing significantly to the global economy. Many chemicals are synthesized, stored, and transported in vast quantities and classified as high production volume chemicals; some are recognized as being toxic industrial chemicals (TICs). Chemical accidents involving chemical installations and transportation are well recognized. Such chemical accidents occur with relative frequency and may result in large numbers of casualties with acute and chronic health effects as well as fatalities. The large-scale production of TICs, the potential for widespread exposure and significant public health impact, together with their relative ease of acquisition, makes deliberate release an area of potential concern. The large numbers of chemicals, together with the large number of potential release scenarios means that the number of possible forms of chemical incident are almost infinite. Therefore, prior to undertaking emergency planning and preparedness, it is necessary to prioritize risk and subsequently mitigate. This is a multi-faceted process, including implementation of industrial protection layers, substitution of hazardous chemicals, and relocation away from communities. Residual risk provides the basis for subsequent planning. Risk-prioritized emergency planning is a tool for identifying gaps, enhancing communication and collaboration, and for policy development. It also serves to enhance preparedness, a necessary prelude to preventing or mitigating the public health risk to deliberate release. Planning is an iterative and on-going process that requires multi-disciplinary agency input, culminating in the formation of a chemical incident plan complimentary to major incident planning. Preparedness is closely related and reflects a state of readiness. It is comprised of several components, including training and exercising. Toxicologists have a role to play in developing syndromic surveillance, recognizing clinical presentation of chemical incidents, developing toxicological datasheets, and the requisition and stockpiling of medical countermeasures. The chemical industry is global and many chemicals are synthesized and transported in vast quantities. Many of these chemicals are toxic and readily available, necessitating the need for identifying and assessing hazard and risks and subsequently planning and preparing for the deliberate release of TICs.

  20. Conservation planning for offsetting the impacts of development: a case study of biodiversity and renewable energy in the Mojave Desert

    USGS Publications Warehouse

    Kreitler, Jason R.; Schloss, Carrie A.; Soong, Oliver; Lee Hannah,; Davis, Frank W.

    2015-01-01

    Balancing society’s competing needs of development and conservation requires careful consideration of tradeoffs. Renewable energy development and biodiversity conservation are often considered beneficial environmental goals. The direct footprint and disturbance of renewable energy, however, can displace species’ habitat and negatively impact populations and natural communities if sited without ecological consideration. Offsets have emerged as a potentially useful tool to mitigate residual impacts after trying to avoid, minimize, or restore affected sites. Yet the problem of efficiently designing a set of offset sites becomes increasingly complex where many species or many sites are involved. Spatial conservation prioritization tools are designed to handle this problem, but have seen little application to offset siting and analysis. To address this need we designed an offset siting support tool for the Desert Renewable Energy Conservation Plan (DRECP) of California, and present a case study of hypothetical impacts from solar development in the Western Mojave subsection. We compare two offset scenarios designed to mitigate a hypothetical 15,331 ha derived from proposed utility-scale solar energy development (USSED) projects. The first scenario prioritizes offsets based precisely on impacted features, while the second scenario offsets impacts to maximize biodiversity conservation gains in the region. The two methods only agree on 28% of their prioritized sites and differ in meeting species-specific offset goals. Differences between the two scenarios highlight the importance of clearly specifying choices and priorities for offset siting and mitigation in general. Similarly, the effects of background climate and land use change may lessen the durability or effectiveness of offsets if not considered. Our offset siting support tool was designed specifically for the DRECP area, but with minor code modification could work well in other offset analyses, and could provide continuing support for a potentially innovative mitigation solution to environmental impacts.

  1. Conservation Planning for Offsetting the Impacts of Development: A Case Study of Biodiversity and Renewable Energy in the Mojave Desert.

    PubMed

    Kreitler, Jason; Schloss, Carrie A; Soong, Oliver; Hannah, Lee; Davis, Frank W

    2015-01-01

    Balancing society's competing needs of development and conservation requires careful consideration of tradeoffs. Renewable energy development and biodiversity conservation are often considered beneficial environmental goals. The direct footprint and disturbance of renewable energy, however, can displace species' habitat and negatively impact populations and natural communities if sited without ecological consideration. Offsets have emerged as a potentially useful tool to mitigate residual impacts after trying to avoid, minimize, or restore affected sites. Yet the problem of efficiently designing a set of offset sites becomes increasingly complex where many species or many sites are involved. Spatial conservation prioritization tools are designed to handle this problem, but have seen little application to offset siting and analysis. To address this need we designed an offset siting support tool for the Desert Renewable Energy Conservation Plan (DRECP) of California, and present a case study of hypothetical impacts from solar development in the Western Mojave subsection. We compare two offset scenarios designed to mitigate a hypothetical 15,331 ha derived from proposed utility-scale solar energy development (USSED) projects. The first scenario prioritizes offsets based precisely on impacted features, while the second scenario offsets impacts to maximize biodiversity conservation gains in the region. The two methods only agree on 28% of their prioritized sites and differ in meeting species-specific offset goals. Differences between the two scenarios highlight the importance of clearly specifying choices and priorities for offset siting and mitigation in general. Similarly, the effects of background climate and land use change may lessen the durability or effectiveness of offsets if not considered. Our offset siting support tool was designed specifically for the DRECP area, but with minor code modification could work well in other offset analyses, and could provide continuing support for a potentially innovative mitigation solution to environmental impacts.

  2. Conservation Planning for Offsetting the Impacts of Development: A Case Study of Biodiversity and Renewable Energy in the Mojave Desert

    PubMed Central

    Kreitler, Jason; Schloss, Carrie A.; Soong, Oliver; Hannah, Lee; Davis, Frank W.

    2015-01-01

    Balancing society’s competing needs of development and conservation requires careful consideration of tradeoffs. Renewable energy development and biodiversity conservation are often considered beneficial environmental goals. The direct footprint and disturbance of renewable energy, however, can displace species’ habitat and negatively impact populations and natural communities if sited without ecological consideration. Offsets have emerged as a potentially useful tool to mitigate residual impacts after trying to avoid, minimize, or restore affected sites. Yet the problem of efficiently designing a set of offset sites becomes increasingly complex where many species or many sites are involved. Spatial conservation prioritization tools are designed to handle this problem, but have seen little application to offset siting and analysis. To address this need we designed an offset siting support tool for the Desert Renewable Energy Conservation Plan (DRECP) of California, and present a case study of hypothetical impacts from solar development in the Western Mojave subsection. We compare two offset scenarios designed to mitigate a hypothetical 15,331 ha derived from proposed utility-scale solar energy development (USSED) projects. The first scenario prioritizes offsets based precisely on impacted features, while the second scenario offsets impacts to maximize biodiversity conservation gains in the region. The two methods only agree on 28% of their prioritized sites and differ in meeting species-specific offset goals. Differences between the two scenarios highlight the importance of clearly specifying choices and priorities for offset siting and mitigation in general. Similarly, the effects of background climate and land use change may lessen the durability or effectiveness of offsets if not considered. Our offset siting support tool was designed specifically for the DRECP area, but with minor code modification could work well in other offset analyses, and could provide continuing support for a potentially innovative mitigation solution to environmental impacts. PMID:26529595

  3. Ports and Waterways Safety Assessment Workshop Report, Buzzards Bay, MA

    DTIC Science & Technology

    2003-09-10

    Light tower observations show the highest average sustained winds along this coast. The Bay develops wind chop more than swell. • The National...beaches and shellfish beds pursuant to public health requirements. Well developed notification plans are in place. • Public health agencies are...implementing selected risk mitigation measures. The PAWSA methodology employs a generic model of waterway risk that was conceptually developed by a

  4. Linking climate change mitigation and coastal eutrophication management through biogas technology: Evidence from a new Danish bioenergy concept.

    PubMed

    Kaspersen, Bjarke Stoltze; Christensen, Thomas Budde; Fredenslund, Anders Michael; Møller, Henrik Bjarne; Butts, Michael Brian; Jensen, Niels H; Kjaer, Tyge

    2016-01-15

    The interest in sustainable bioenergy solutions has gained great importance in Europe due to the need to reduce GHG emissions and to meet environmental policy targets, not least for the protection of groundwater and surface water quality. In the Municipality of Solrød in Denmark, a novel bioenergy concept for anaerobic co-digestion of food industry residues, manure and beach-cast seaweed has been developed and tested in order to quantify the potential for synergies between climate change mitigation and coastal eutrophication management in the Køge Bay catchment. The biogas plant, currently under construction, was designed to handle an annual input of up to 200,000 t of biomass based on four main fractions: pectin wastes, carrageenan wastes, manure and beach-cast seaweed. This paper describes how this bioenergy concept can contribute to strengthening the linkages between climate change mitigation strategies and Water Framework Directive (WFD) action planning. Our assessments of the projected biogas plant indicate an annual reduction of GHG emissions of approx. 40,000 t CO2 equivalents, corresponding to approx. 1/3 of current total GHG emissions in the Municipality of Solrød. In addition, nitrogen and phosphorous loads to Køge Bay are estimated to be reduced by approx. 63 t yr.(-1) and 9 tyr.(-1), respectively, contributing to the achievement of more than 70% of the nutrient reduction target set for Køge Bay in the first WFD river basin management plan. This study shows that anaerobic co-digestion of the specific food industry residues, pig manure and beach-cast seaweed is feasible and that there is a very significant, cost-effective GHG and nutrient loading mitigation potential for this bioenergy concept. Our research demonstrates how an integrated planning process where considerations about the total environment are integrated into the design and decision processes can support the development of this kind of holistic bioenergy solutions. Copyright © 2015 Elsevier B.V. All rights reserved.

  5. Anticipation and response: pandemic influenza in Malawi, 2009

    PubMed Central

    Sambala, Evanson Z.; Manderson, Lenore

    2017-01-01

    ABSTRACT Background: In 2006, Malawi developed a national influenza plan to mitigate, prevent and manage the burden of infection should an outbreak occur. In 2009, it translated its contingency plan to respond to the unfolding influenza pandemic. However, little is known of how Malawi translated its national influenza plan into response actions, or the success of these responses. Objective: To investigate how Malawi translated its preparedness plan and so broaden our understanding of the outcomes of the responses. Methods: We draw on data from 22 in-depth interviews with government policymakers and people working at a policy level in various non-governmental organisations, conducted to assess the level of preparedness and the challenges of translating this. Results: Through a number of public health initiatives, authorities developed communication strategies, strengthened influenza surveillance activities and updated overall goals in pandemic training and education. However, without influenza drills, exercises and simulations to test the plan, activating the pandemic plan, including coordinating and deploying generic infection control measures, was problematic. Responses during the pandemic were at times ‘weak and clumsy’ and failed to mirror the activities and processes highlighted in the preparedness plan. Conclusions: Participants stressed that in order to achieve a coordinated and successful response to mitigate and prevent the further transmission of pandemic influenza, good preparation was critical. The key elements which they identified as relevant for a rapid response included effective communications, robust evidence-based decision-making, strong and reliable surveillance systems and flexible public health responses. To effectively articulate a viable trajectory of pandemic responses, the potential value of simulation exercises could be given more consideration as a mean of sustaining good levels of preparedness and responses against future pandemics. These all demand a well-structured planning for and response to pandemic influenza strategy developed by a functioning scientific and policy advisory committee. PMID:28753109

  6. Hungry Horse Dam Fisheries Mitigation; Kokanee Stocking and Monitoring in Flathead Lake, 1995 Annual Report.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Fredenberg, Wade; Carty, Daniel; Cavigli, Jon

    1996-06-01

    The operation of Hungry Horse Dam on the South Fork-of the Flathead River reduced the reproductive success of kokanee (Oncorhynchus nerka) spawning in the Flathead River. Montana Fish, Wildlife and Parks (MFWP) and the Confederated Salish and Kootenai Tribes (CSKT) authored a mitigation plan to offset those losses. The mitigation goal, stated in the Fisheries Mitigation Plan for Losses Attributed to the Construction and Operation of Hungry Horse Dam, is to: {open_quotes}Replace lost annual production of 100,000 kokanee adults, initially through hatchery production and pen rearing in Flathead Lake, partially replacing lost forage for lake trout (Salvelinus namaycush) in Flatheadmore » Lake.{close_quotes}« less

  7. 44 CFR 201.3 - Responsibilities.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... cost share for the Flood Mitigation Assistance (FMA) and Severe Repetitive Loss (SRL) programs... HOMELAND SECURITY DISASTER ASSISTANCE MITIGATION PLANNING § 201.3 Responsibilities. (a) General. This... Administrator are to: (1) Oversee all FEMA related pre- and post-disaster hazard mitigation programs and...

  8. 78 FR 34112 - Review and Revision of the National Infrastructure Protection Plan

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-06

    ... consider sector dependencies on energy and communications systems, and identify pre-event and mitigation... development efforts; Review of the risk management approach; Sector dependencies on energy and communications... framework going forward. Sector Dependencies on Energy and Communications Systems PPD-21 acknowledges the...

  9. 49 CFR 236.907 - Product Safety Plan (PSP).

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... railroad operation or categories of operations on which the product is designed to be used, including train... comprehensive description of all hazards to be addressed in the system design and development, mitigation... the safety assurance concepts used in the product design, including an explanation of the design...

  10. 49 CFR 236.907 - Product Safety Plan (PSP).

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... railroad operation or categories of operations on which the product is designed to be used, including train... comprehensive description of all hazards to be addressed in the system design and development, mitigation... the safety assurance concepts used in the product design, including an explanation of the design...

  11. 49 CFR 236.907 - Product Safety Plan (PSP).

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... railroad operation or categories of operations on which the product is designed to be used, including train... comprehensive description of all hazards to be addressed in the system design and development, mitigation... the safety assurance concepts used in the product design, including an explanation of the design...

  12. Development of improved ambient computation methods in support of the National Parks Air Tour Management Act

    DOT National Transportation Integrated Search

    2008-09-01

    Approximately 85 National Park units with commercial air tours will need Air Tour : Management Plans (ATMPs). The objective of an ATMP is to prevent or mitigate : significant adverse impacts to National Park resources. Noise impacts must be : charact...

  13. Nantucket, Ma. Climate Protection Action Plan: A Public Outreach Strategy

    NASA Astrophysics Data System (ADS)

    Petrik, C.; Stephenson, A.; Petsch, S.

    2009-12-01

    As communities and municipalities gain a better understanding of climate change, they are exploring the ways in which to work towards adaptation and mitigation. One strategy that the Island of Nantucket, Massachusetts turned toward is the drafting of a Climate Protection Action Plan (CPAP). The CPAP was developed during the summer of 2009 to meet three goals: (1) assist the Town of Nantucket in creating a framework to help them reduce CO2 emissions; (2) educate the municipality and community in techniques that promote energy efficiency and sustainability on the island; and (3) document past, present and future approaches adopted by the Town towards emissions reduction and energy sustainability. In particular, this project focused on using local strengths and natural resources identified by island stakeholders that may help the island to mitigate carbon emissions and adapt to climate change.. Drafting the CPAP provided community members and politicians with an opportunity to become better educated in the science of climate change and to learn how climate change will affect their community. On the island of Nantucket, leaders in the religious, civic, and political communities were brought into a conversation about how each group could contribute to reducing greenhouse gas emissions. A geosciences graduate student was brought into the CPAP team as a climate fellow to facilitate this conversation. This provided the foundation for stakeholder recommendations incorporated into the CPAP. This capacity-building model served as an effective way to create an informal learning environment about climate change that allowed members of the island community to directly participate in developing their locally appropriate climate protection strategy. The draft CPAP developed through this study and presented to the Town of Nantucket comprises assessments and recommendations in public research and education; building and energy efficiency; transportation; renewable energy; and carbon offsets. Through the drafting of these types of Plans, geoscientists have the unique opportunity to offer a scientific foundation to communities that are looking to better understand climate change, its projected affects, and how they can best develop plans for mitigation and adaptation.

  14. West Valley demonstration project: Implementation of the kerosene mitigation plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Blickwedehl, R.R.; Goodman, J.; Valenti, P.J.

    1987-05-01

    An aggressive program was implemented to mitigate the migration of radioactive kerosene believed to have originated from the West Valley NRC-Licensed Disposal Area (NDA) disposal trenches designated as SH-10 and SH-11 (Special Holes 10 and 11). This report provides a historical background of the events leading to the migration problem, the results of a detailed investigation to determine the location and source of the kerosene migration, the remediation plan to mitigate the migration, and the actions taken to successfully stabilize the kerosene. 7 refs., 19 figs., 1 tab.

  15. The inclusion of biodiversity in environmental impact assessment: Policy-related progress limited by gaps and semantic confusion.

    PubMed

    Bigard, Charlotte; Pioch, Sylvain; Thompson, John D

    2017-09-15

    Natural habitat loss and fragmentation, as a result of development projects, are major causes of biodiversity erosion. Environmental impact assessment (EIA) is the most commonly used site-specific planning tool that takes into account the effects of development projects on biodiversity by integrating potential impacts into the mitigation hierarchy of avoidance, reduction, and offset measures. However, the extent to which EIA fully address the identification of impacts and conservation stakes associated with biodiversity loss has been criticized in recent work. In this paper we examine the extent to which biodiversity criteria have been integrated into 42 EIA from 2006 to 2016 for small development projects in the Montpellier Metropolitan territory in southern France. This study system allowed us to question how EIA integrates biodiversity impacts on a scale relevant to land-use planning. We examine how biodiversity inclusion has changed over time in relation to new policy for EIA and how the mitigation hierarchy is implemented in practice and in comparison with national guidelines. We demonstrate that the inclusion of biodiversity features into EIA has increased significantly in relation to policy change. Several weaknesses nevertheless persist, including the continued absence of substitution solution assessment, a correct analysis of cumulative impacts, the evaluation of impacts on common species, the inclusion of an ecological network scale, and the lack of monitoring and evaluation measures. We also show that measures for mitigation hierarchy are primarily associated with the reduction of impacts rather than their avoidance, and avoidance and offset measures are often misleadingly proposed in EIA. There is in fact marked semantic confusion between avoidance, reduction and offset measures that may impair stakeholders' understanding. All in all, reconsideration of stakeholders routine practices associated with a more strategic approach towards impact anticipation and avoidance at a land-use planning scale is now necessary for the mitigation hierarchy to become a clear and practical hierarchy for "no net loss" objectives based on conservation priorities. Copyright © 2017 Elsevier Ltd. All rights reserved.

  16. Development and Execution of End-of-Mission Operations Case Study of the UARS and ERBS End-of-Mission Plans

    NASA Technical Reports Server (NTRS)

    Hughes, John; Marius, Julio L.; Montoro, Manuel; Patel, Mehul; Bludworth, David

    2006-01-01

    This Paper is a case study of the development and execution of the End-of-Mission plans for the Earth Radiation Budget Satellite (ERBS) and the Upper Atmosphere Research Satellite (UARS). The goals of the End-of-Mission Plans are to minimize the time the spacecraft remains on orbit and to minimize the risk of creating orbital debris. Both of these Missions predate the NASA Management Instructions (NMI) that directs missions to provide for safe mission termination. Each spacecrafts had their own unique challenges, which required assessing End-of-Mission requirements versus spacecraft limitations. Ultimately the End-of- Mission operations were about risk mitigation. This paper will describe the operational challenges and the lessons learned executing these End-of-Mission Plans

  17. Evaluating fuel complexes for fire hazard mitigation planning in the southeastern United States

    Treesearch

    Anne G. Andreu; Dan Shea; Bernard R. Parresol; Roger D. Ottmar

    2012-01-01

    Fire hazard mitigation planning requires an accurate accounting of fuel complexes to predict potential fire behavior and effects of treatment alternatives. In the southeastern United States, rapid vegetation growth coupled with complex land use history and forest management options requires a dynamic approach to fuel characterization. In this study we assessed...

  18. Maximizing mitigation benefits-making a difference with strategic inter-resource agency planning : year two technical report.

    DOT National Transportation Integrated Search

    2014-11-01

    The objective of this research project is to assess current mitigation policies and practices in comparison to : resource agency objectives and to identify mitigation strategies and priorities that provide greater cost-benefit potential and implement...

  19. Maximizing mitigation benefits-making a difference with strategic inter-resource agency planning : year one technical report.

    DOT National Transportation Integrated Search

    2014-04-01

    The objective of this research project is to assess current mitigation policies and practices in comparison to : resource agency objectives, and identify mitigation strategies and priorities that provide greater cost-benefit : potential and implement...

  20. 44 CFR 201.3 - Responsibilities.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... receive the reduced cost share for the Flood Mitigation Assistance (FMA) and Severe Repetitive Loss (SRL... HOMELAND SECURITY DISASTER ASSISTANCE MITIGATION PLANNING § 201.3 Responsibilities. (a) General. This... Administrator are to: (1) Oversee all FEMA related pre- and post-disaster hazard mitigation programs and...

  1. 44 CFR 201.3 - Responsibilities.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... receive the reduced cost share for the Flood Mitigation Assistance (FMA) and Severe Repetitive Loss (SRL... HOMELAND SECURITY DISASTER ASSISTANCE MITIGATION PLANNING § 201.3 Responsibilities. (a) General. This... Administrator are to: (1) Oversee all FEMA related pre- and post-disaster hazard mitigation programs and...

  2. 44 CFR 201.3 - Responsibilities.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... receive the reduced cost share for the Flood Mitigation Assistance (FMA) and Severe Repetitive Loss (SRL... HOMELAND SECURITY DISASTER ASSISTANCE MITIGATION PLANNING § 201.3 Responsibilities. (a) General. This... Administrator are to: (1) Oversee all FEMA related pre- and post-disaster hazard mitigation programs and...

  3. 44 CFR 201.3 - Responsibilities.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... receive the reduced cost share for the Flood Mitigation Assistance (FMA) and Severe Repetitive Loss (SRL... HOMELAND SECURITY DISASTER ASSISTANCE MITIGATION PLANNING § 201.3 Responsibilities. (a) General. This... Administrator are to: (1) Oversee all FEMA related pre- and post-disaster hazard mitigation programs and...

  4. Assessing the accuracy of crown biomass equations for the major commercial species of the interior northwest: study plan and preliminary results

    Treesearch

    David L.R. Affleck; Brian R. Turnquist

    2012-01-01

    Fueled by the insistencies of wildfire mitigation, bioenergy development, and carbon sequestration, there is growing demand for reliable characterizations of crown and stem biomass stocks in conifer forests of the Interior Northwest, United States (western Montana, northern Idaho, and eastern Washington). Predictive equations for crown biomass have been developed for...

  5. Hungry Horse Mitigation; Flathead Lake, 2001-2002 Annual Report.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hansen, Barry

    2003-06-09

    The Confederated Salish and Kootenai Tribes (CSKT) and Montana Fish Wildlife and Parks (MFWP) wrote ''Fisheries Mitigation Plan for Losses Attributable to the Construction and Operation of Hungry Horse Dam'' in March 1991 to define the fisheries losses, mitigation alternatives and recommendations to protect, mitigate and enhance resident fish and aquatic habitat affected by Hungry Horse Dam. On November 12, 1991, the Northwest Power Planning Council (NPPC) approved the mitigation plan with minor modifications, called for a detailed implementation plan, and amended measures 903(h)(1) through (7). A long-term mitigation plan was submitted in August 1992, was approved by the Councilmore » in 1993, and the first contract for this project was signed on November 11, 1993. The problem this project addresses is the loss of habitat, both in quality and quantity, in the interconnected Flathead Lake and River basin resulting from the construction and operation of Hungry Horse Dam. The purpose of the project is to both implement mitigation measures and monitor the biological responses to those measures including those implemented by Project Numbers 9101903 and 9101904. Goals and objectives of the 1994 Fish and Wildlife Program (Section 10.1) addressed by this project are the rebuilding to sustainable levels weak, but recoverable, native populations injured by the hydropower system. The project mitigates the blockage of spawning runs by Hungry Horse Dam by restoring and even creating spawning habitats within direct drainages to Flathead Lake. The project also addresses the altered habitat within Flathead Lake resulting from species shifts and consequent dominance of new species that restricts the potential success of mitigation measures. Specific goals of this project are to create and restore habitat and quantitatively monitor changes in fish populations to verify the efficacy of our mitigation measures. The project consists of three components: monitoring, restoration and research. Monitoring, for example, includes a spring gillnetting series conducted annually in Flathead Lake and builds on an existing data set initiated in 1981. Monitoring of the experimental kokanee reintroduction was a primary activity of this project between 1992 and 1997. Lake trout, whose high densities have precluded successful mitigation of losses of other species in Flathead Lake, have been monitored since 1996 to measure several biological parameters. Results of this work have utility in determining the population status of this key predator in Flathead Lake. The project has also defined the baseline condition of the Flathead Lake fishery in 1992-1993 and has conducted annual lakewide surveys since 1998. The restoration component of the project has addressed several stream channel, riparian, and fish passage problems. The research component of the project began in FY 2000 and measured trophic linkages between M. relicta and other species to assist in predicting the results of potential mitigation strategies. Only Objective 1 in the workplan is funded entirely by Hungry Horse Mitigation funds. Additional funds are drawn from other sources to assist in completion of Objectives 2-6.« less

  6. NEOShield - A global approach to NEO Impact Threat Mitigation

    NASA Astrophysics Data System (ADS)

    Michel, Patrick

    2015-03-01

    NEOShield is a European-Union funded project coordinated by the German Aero-space Center, DLR, to address near-Earth object (NEO) impact hazard mitigation issues. The NEOShield consortium consists of 13 research institutes, universities, and industrial partners from 6 countries and includes leading US and Russian space organizations. The project is funded for a period of 3.5 years from January 2012 with a total of 5.8 million euros. The primary aim of the project is to investigate in detail promising mitigation techniques, such as the kinetic impactor, blast deflection, and the gravity tractor, and devise feasible demonstration missions. Options for an international strategy for implementation when an actual impact threat arises will also be investigated. The NEOShield work plan consists of scientific investigations into the nature of the impact hazard and the physical properties of NEOs, and technical and engineering studies of practical means of deflecting NEOs. There exist many ideas for asteroid deflection techniques, many of which would require considerable scientific and technological development. The emphasis of NEOShield is on techniques that are feasible with current technology, requiring a minimum of research and development work. NEOShield aims to provide detailed designs of feasible mitigation demonstration missions, targeting NEOs of the kind most likely to trigger the first space-based mitigation action. Most of the asteroid deflection techniques proposed to date require physical contact with the threatening object, an example being the kinetic impactor. NEOShield includes research into the mitigation-relevant physical properties of NEOs on the basis of remotely-sensed astronomical data and the results of rendezvous missions, the observational techniques required to efficiently gather mitigation-relevant data on the dynamical state and physical properties of a threatening NEO, and laboratory investigations using gas guns to fire projectiles into asteroid regolith analog materials. The gas-gun investigations enable state-of-the-art numerical models to be verified at small scales. Computer simulations at realistic NEO scales are used to investigate how NEOs with a range of properties would respond to a pulse of energy applied in a deflection attempt. The technical work includes the development of crucial technologies, such as the autonomous guidance of a kinetic impactor to a precise point on the surface of the target, and the detailed design of realistic missions for the purpose of demonstrating the applicability and feasibility of one or more of the techniques investigated. Theoretical work on the blast deflection method of mitigation is designed to probe the circumstances in which this last line of defense may be the only viable option and the issues relating to its deployment. A global response campaign roadmap will be developed based on realistic scenarios presented, for example, by the discovery of an object such as 99942 Apophis or 2011 AG5 on a threatening orbit. The work will include considerations of the timeline of orbit knowledge and impact probability development, reconnaissance observations and fly-by or rendezvous missions, the political decision to mount a mitigation attempt, and the design, development, and launch of the mitigation mission. Collaboration with colleagues outside the NEOShield Consortium involved in complementary activities (e.g. under the auspices of the UN, NASA, or ESA) is being sought in order to establish a broad international strategy. We present a brief overview of the history and planned scope of the project, and progress made to date. The NEOShield project (http://www.neoshield.net) has received funding from the European Union Seventh Framework Program (FP7/2007-2013) under Grant Agreement no. 282703.

  7. Guidance on the prevention and mitigation of environmental, health and safety impacts of electromagnetic fields and radiation for electric transit systems

    DOT National Transportation Integrated Search

    2008-01-02

    The Federal Transit Administration (FTA) Office of Planning and Environment (TPE) tasked the Volpe Center to develop guidance for transit planners, in order to address persisting public health and safety concerns with prolonged EMF environmental expo...

  8. RosBREED2: Progress and future plans to enable DNA-informed breeding in the Rosaceae

    USDA-ARS?s Scientific Manuscript database

    Rosaceous crops provide vital contributions to human health and are economically significant in communities across the U.S. Industry stakeholders have given high priority to development of new cultivars that exhibit disease resistance and superior horticultural quality to mitigate production, handli...

  9. Forecasting the relative influence of environmental and anthropogenic stressors on polar bears

    Treesearch

    Todd C. Atwood; Bruce G. Marcot; David C. Douglas; Steven C. Amstrup; Karyn D. Rode; George M. Durner; Jeffrey F. Bromaghin

    2016-01-01

    Effective conservation planning requires understanding and ranking threats to wildlife populations. We developed a Bayesian network model to evaluate the relative influence of environmental and anthropogenic stressors, and their mitigation, on the persistence of polar bears (Ursus maritimus). Overall sea ice conditions, affected by rising global...

  10. Ready to Respond: Case Studies in Campus Safety and Security

    ERIC Educational Resources Information Center

    Hyatt, James A.

    2010-01-01

    Is your campus primed for the next big emergency? The National Campus Safety and Security Project (NCSSP), led by NACUBO, sought to help colleges and universities develop comprehensive emergency management plans that address the four phases of emergency management: prevention/mitigation, preparedness, response, and recovery. A major component of…

  11. Nonmarket resource valuation in the postfire environment

    Treesearch

    David Calkin; Greg Jones; Kevin Hyde

    2008-01-01

    After the containment of large wildland fires, major onsite and downstream effects including lost soil productivity, watershed response, increased vulnerability to invasive weeds, and downstream sedimentation can cause threats to human life and property. Burned Area Emergency Response (BAER) teams are responsible for developing treatment plans to mitigate negative...

  12. Iskuulpa Watershed Management Plan : A Five-Year Plan for Protecting and Enhancing Fish and Wildlife Habitats in the Iskuulpa Watershed.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Confederated Tribes of the Umatilla Indian Reservation Wildlife Program

    The Confederated Tribes of the Umatilla Indian Reservation (CTUIR) propose to protect, enhance, and mitigate wildlife and wildlife habitat and watershed resources in the Iskuulpa Watershed. The Iskuulpa Watershed Project was approved as a Columbia River Basin Wildlife Fish and Mitigation Project by the Bonneville Power Administration (BPA) and Northwest Power Planning Council (NWPPC) in 1998. Iskuulpa will contribute towards meeting BPA's obligation to compensate for wildlife habitat losses resulting from the construction of the John Day and McNary Hydroelectric facilities on the Columbia River. By funding the enhancement and operation and maintenance of the Iskuulpa Watershed, BPA will receivemore » credit towards their mitigation debt. The purpose of the Iskuulpa Watershed management plan update is to provide programmatic and site-specific standards and guidelines on how the Iskuulpa Watershed will be managed over the next three years. This plan provides overall guidance on both short and long term activities that will move the area towards the goals, objectives, and desired future conditions for the planning area. The plan will incorporate managed and protected wildlife and wildlife habitat, including operations and maintenance, enhancements, and access and travel management.« less

  13. Maneuver Planning for Conjunction Risk Mitigation with Ground-track Control Requirements

    NASA Technical Reports Server (NTRS)

    McKinley, David

    2008-01-01

    The planning of conjunction Risk Mitigation Maneuvers (RMM) in the presence of ground-track control requirements is analyzed. Past RMM planning efforts on the Aqua, Aura, and Terra spacecraft have demonstrated that only small maneuvers are available when ground-track control requirements are maintained. Assuming small maneuvers, analytical expressions for the effect of a given maneuver on conjunction geometry are derived. The analytical expressions are used to generate a large trade space for initial RMM design. This trade space represents a significant improvement in initial maneuver planning over existing methods that employ high fidelity maneuver models and propagation.

  14. Developing Capacity for Cities to Adapt to a Changing Climate-a Case Study in Boulder, Colorado

    NASA Astrophysics Data System (ADS)

    Sands, R.; Groves, D. G.; Nason, M.; Pandya, R.

    2016-12-01

    The City of Boulder in Colorado has undertaken many progressive climate-related initiatives, from signing the Kyoto protocol to passing a Climate Action Tax. But as the city prepared to launch its Climate Commitment document and lead a community process, it realized that one critical group that had not been fully engaged in the process was its own staff. It became clear that for organizational change to occur and for the city to meet its goals, city staff needed to develop a deeper understanding of the importance of the climate goals while also learning better how to use these goals to guide their long-term planning. In early 2016, the city launched a year-long "Climate Leaders" initiative which comprised of a series of workshops that brought together over 70 staff members with climate scientists and experts in climate adaptation planning. The first two workshops, billed as Climate 101 and 201, reviewed the best available scientific information about climate threats and potential impacts, and worked with participants to understand how climate changes could affect diverse city functions. These interactive workshops also explored ways to help city staff feel comfortable preparing for a significantly different climate and discussed ways to communicate this information to the public. From there the group split into two tracks. A "mitigation" track focused on the ways in which Boulder could meet its aggressive emissions reduction targets. The "adaptation" track developed integrated scenarios for citywide planning to highlight Boulder's vulnerability to climate change and guide adaptation planning. Bringing these two conversations together is helping city staff to explore critical linkages between mitigation and adaptation, develop common messages to build community support for climate action, and inform comprehensive climate resiliency planning. We will describe how Boulder successfully partnered with scientists and planning experts to program a year of interactive workshops to bring diverse city staff into the climate action process. We will share outcomes from the development of the integrated climate scenarios vulnerability assessment and adaptation planning. Lastly we will share key lessons learned that will be valuable to other cities and jurisdictions engaging in similar climate action.

  15. Lunar Dust: Characterization and Mitigation

    NASA Technical Reports Server (NTRS)

    Hyatt. Mark J.; Feighery, John

    2007-01-01

    Lunar dust is a ubiquitous phenomenon which must be explicitly addressed during upcoming human lunar exploration missions. Near term plans to revisit the moon as a stepping stone for further exploration of Mars, and beyond, places a primary emphasis on characterization and mitigation of lunar dust. Comprised of regolith particles ranging in size from tens of nanometers to microns, lunar dust is a manifestation of the complex interaction of the lunar soil with multiple mechanical, electrical, and gravitational effects. The environmental and anthropogenic factors effecting the perturbation, transport, and deposition of lunar dust must be studied in order to mitigate it's potentially harmful effects on exploration systems. The same hold true for assessing the risk it may pose for toxicological health problems if inhaled. This paper presents the current perspective and implementation of dust knowledge management and integration, and mitigation technology development activities within NASA's Exploration Technology Development Program. This work is presented within the context of the Constellation Program's Integrated Lunar Dust Management Strategy. This work further outlines the scientific basis for lunar dust behavior, it's characteristics and potential effects, and surveys several potential strategies for its control and mitigation both for lunar surface operations and within the working volumes of a lunar outpost. The paper also presents a perspective on lessons learned from Apollo and forensics engineering studies of Apollo hardware.

  16. Evaluating Aggregate Terrestrial Impacts of Road Construction Projects for Advanced Regional Mitigation

    NASA Astrophysics Data System (ADS)

    Thorne, James H.; Girvetz, Evan H.; McCoy, Michael C.

    2009-05-01

    This study presents a GIS-based database framework used to assess aggregate terrestrial habitat impacts from multiple highway construction projects in California, USA. Transportation planners need such impact assessment tools to effectively address additive biological mitigation obligations. Such assessments can reduce costly delays due to protracted environmental review. This project incorporated the best available statewide natural resource data into early project planning and preliminary environmental assessments for single and multiple highway construction projects, and provides an assessment of the 10-year state-wide mitigation obligations for the California Department of Transportation. Incorporation of these assessments will facilitate early and more strategic identification of mitigation opportunities, for single-project and regional mitigation efforts. The data architecture format uses eight spatial scales: six nested watersheds, counties, and transportation planning districts, which were intersected. This resulted in 8058 map planning units statewide, which were used to summarize all subsequent analyses. Range maps and georeferenced locations of federally and state-listed plants and animals and a 55-class landcover map were spatially intersected with the planning units and the buffered spatial footprint of 967 funded projects. Projected impacts were summarized and output to the database. Queries written in the database can sum expected impacts and provide summaries by individual construction project, or by watershed, county, transportation district or highway. The data architecture allows easy incorporation of new information and results in a tool usable without GIS by a wide variety of agency biologists and planners. The data architecture format would be useful for other types of regional planning.

  17. Evaluating aggregate terrestrial impacts of road construction projects for advanced regional mitigation.

    PubMed

    Thorne, James H; Girvetz, Evan H; McCoy, Michael C

    2009-05-01

    This study presents a GIS-based database framework used to assess aggregate terrestrial habitat impacts from multiple highway construction projects in California, USA. Transportation planners need such impact assessment tools to effectively address additive biological mitigation obligations. Such assessments can reduce costly delays due to protracted environmental review. This project incorporated the best available statewide natural resource data into early project planning and preliminary environmental assessments for single and multiple highway construction projects, and provides an assessment of the 10-year state-wide mitigation obligations for the California Department of Transportation. Incorporation of these assessments will facilitate early and more strategic identification of mitigation opportunities, for single-project and regional mitigation efforts. The data architecture format uses eight spatial scales: six nested watersheds, counties, and transportation planning districts, which were intersected. This resulted in 8058 map planning units statewide, which were used to summarize all subsequent analyses. Range maps and georeferenced locations of federally and state-listed plants and animals and a 55-class landcover map were spatially intersected with the planning units and the buffered spatial footprint of 967 funded projects. Projected impacts were summarized and output to the database. Queries written in the database can sum expected impacts and provide summaries by individual construction project, or by watershed, county, transportation district or highway. The data architecture allows easy incorporation of new information and results in a tool usable without GIS by a wide variety of agency biologists and planners. The data architecture format would be useful for other types of regional planning.

  18. 75 FR 13125 - Pet Spot-On Analysis and Mitigation Plan Available for Public Comment; Notice of Availability

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-18

    ... ENVIRONMENTAL PROTECTION AGENCY [EPA-HQ-OPP-2010-0229; FRL-8816-8] Pet Spot-On Analysis and... registered pet spot-on products to control fleas and ticks and a mitigation plan. The analysis consists of a Technical Review Document and Data Evaluation Records for pet spot-on products. The Agency is requesting...

  19. Changing Urban Carbon Metabolism over Time: Historical Trajectory and Future Pathway.

    PubMed

    Chen, Shaoqing; Chen, Bin

    2017-07-05

    Cities are expected to play a major role in carbon emissions mitigation. A key step in decoupling urban economy from carbon emissions is to understand the full impact of socioeconomic development on urban metabolism over time. Herein, we establish a system-based framework for modeling the variation of urban carbon metabolism through time by integrating a metabolic flow inventory, input-output model, and network analysis. Using Beijing as a case study, we track the historical trajectory of carbon flows embodied in urban final consumption over 1985-2012. We find that while the tendency of increase in direct carbon emission continues within this time frame, consumption-based carbon footprint might have peaked around 2010. Significant transitions in emission intensity and roles sectors play in transferring carbon over the period are important signs of decoupling urban development from carbonization. Our further analysis of driving factors reveals a strong competition between efficiency gains and consumption level rise, showing a cumulative contribution of -584% and 494% to total carbon footprint, respectively. Projection into a future pathway suggests there is still a great potential for carbon mitigation for the city, but a strong mitigation plan is required to achieve such decarbonization before 2030. By bridging temporal metabolic model and socioeconomic planning, this framework fills one of the main gaps between monitoring of urban metabolism and design of a low-carbon economy.

  20. Harry S. Truman Dam and Reservoir, Missouri, Mitigation of the Adverse Effects Upon the Local Paleontological Resources. Volume 2. Plan Maps of Excavations.

    DTIC Science & Technology

    1983-01-01

    7 A-A147 693 HARRY S TRUMAN D’AM AND RESERVOIR MISSOURI MITIGATION OF 1/ THE ADVERSE EFFEC. .0) ILLINOIS STATE MUSEUM SOCIETY SPRINGFIELD d d...BUREAU OF STANDARDS-.1963-A 1 2 qZTM II 0A MITIGATION OF THE ADVERSE EFFECTS UPON THE LOCAL PALEONTOLOGICAL RESOURCES OF THE HARRY S. TRUMAN DAM AND...RESERVOIR OSAGE RIVER BASIN, MISSOURI FINAL REPORT OF FINDINGS VOLUME II: PLAN MAPS OF EXCAVATIONS by Jeffrey J. Saunders, Ph.D. Illinois State Museum

  1. ENHANCED PRACTICAL PHOTOSYNTHETIC CO2 MITIGATION

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Dr. Gregory Kremer; Dr. David J. Bayless; Dr. Morgan Vis

    2001-07-25

    This quarterly report documents significant achievements in the Enhanced Practical Photosynthetic CO{sub 2} Mitigation project during the period from 4/03/2001 through 7/02/2001. Most of the achievements are milestones in our efforts to complete the tasks and subtasks that constitute the project objectives. Note that this version of the quarterly technical report is a revision to add the reports from subcontractors Montana State and Oak Ridge National Laboratories The significant accomplishments for this quarter include: Development of an experimental plan and initiation of experiments to create a calibration curve that correlates algal chlorophyll levels with carbon levels (to simplify future experimentalmore » procedures); Completion of debugging of the slug flow reactor system, and development of a plan for testing the pressure drop of the slug flow reactor; Design and development of a new bioreactor screen design which integrates the nutrient delivery drip system and the harvesting system; Development of an experimental setup for testing the new integrated drip system/harvesting system; Completion of model-scale bioreactor tests examining the effects of CO{sub 2} concentration levels and lighting levels on Nostoc 86-3 growth rates; Completion of the construction of a larger model-scale bioreactor to improve and expand testing capabilities and initiation of tests; Substantial progress on construction of a pilot-scale bioreactor; and Preliminary economic analysis of photobioreactor deployment. Plans for next quarter's work are included in the conclusions. A preliminary economic analysis is included as an appendix.« less

  2. Co-control of urban air pollutants and greenhouse gases in Mexico City.

    PubMed

    West, J Jason; Osnaya, Patricia; Laguna, Israel; Martínez, Julia; Fernández, Adrián

    2004-07-01

    This study addresses the synergies of mitigation measures to control urban air pollutant and greenhouse gas (GHG) emissions, in developing integrated "co-control" strategies for Mexico City. First, existing studies of emissions reduction measures--PROAIRE (the air quality plan for Mexico City) and separate GHG studies--are used to construct a harmonized database of options. Second, linear programming (LP) is developed and applied as a decision-support tool to analyze least-cost strategies for meeting co-control targets for multiple pollutants. We estimate that implementing PROAIRE measures as planned will reduce 3.1% of the 2010 metropolitan CO2 emissions, in addition to substantial local air pollutant reductions. Applying the LP, PROAIRE emissions reductions can be met at a 20% lower cost, using only the PROAIRE measures, by adjusting investments toward the more cost-effective measures; lower net costs are possible by including cost-saving GHG mitigation measures, but with increased investment. When CO2 emission reduction targets are added to PROAIRE targets, the most cost-effective solutions use PROAIRE measures for the majority of local pollutant reductions, and GHG measures for additional CO2 control. Because of synergies, the integrated planning of urban-global co-control can be beneficial, but we estimate that for Mexico City these benefits are often small.

  3. Success in transmitting hazard science

    NASA Astrophysics Data System (ADS)

    Price, J. G.; Garside, T.

    2010-12-01

    Money motivates mitigation. An example of success in communicating scientific information about hazards, coupled with information about available money, is the follow-up action by local governments to actually mitigate. The Nevada Hazard Mitigation Planning Committee helps local governments prepare competitive proposals for federal funds to reduce risks from natural hazards. Composed of volunteers with expertise in emergency management, building standards, and earthquake, flood, and wildfire hazards, the committee advises the Nevada Division of Emergency Management on (1) the content of the State’s hazard mitigation plan and (2) projects that have been proposed by local governments and state agencies for funding from various post- and pre-disaster hazard mitigation programs of the Federal Emergency Management Agency. Local governments must have FEMA-approved hazard mitigation plans in place before they can receive this funding. The committee has been meeting quarterly with elected and appointed county officials, at their offices, to encourage them to update their mitigation plans and apply for this funding. We have settled on a format that includes the county’s giving the committee an overview of its infrastructure, hazards, and preparedness. The committee explains the process for applying for mitigation grants and presents the latest information that we have about earthquake hazards, including locations of nearby active faults, historical seismicity, geodetic strain, loss-estimation modeling, scenarios, and documents about what to do before, during, and after an earthquake. Much of the county-specific information is available on the web. The presentations have been well received, in part because the committee makes the effort to go to their communities, and in part because the committee is helping them attract federal funds for local mitigation of not only earthquake hazards but also floods (including canal breaches) and wildfires, the other major concerns in Nevada. Local citizens appreciate the efforts of the state officials to present the information in a public forum. The Committee’s earthquake presentations to the counties are supplemented by regular updates in the two most populous counties during quarterly meetings of the Nevada Earthquake Safety Council, generally alternating between Las Vegas and Reno. We have only 17 counties in Nevada, so we are making good progress at reaching each within a few years. The Committee is also learning from the county officials about their frustrations in dealing with the state and federal bureaucracies. Success is documented by the mitigation projects that FEMA has funded.

  4. Preparing for Euro 2012: developing a hazard risk assessment.

    PubMed

    Wong, Evan G; Razek, Tarek; Luhovy, Artem; Mogilevkina, Irina; Prudnikov, Yuriy; Klimovitskiy, Fedor; Yutovets, Yuriy; Khwaja, Kosar A; Deckelbaum, Dan L

    2015-04-01

    Risk assessment is a vital step in the disaster-preparedness continuum as it is the foundation of subsequent phases, including mitigation, response, and recovery. To develop a risk assessment tool geared specifically towards the Union of European Football Associations (UEFA) Euro 2012. In partnership with the Donetsk National Medical University, Donetsk Research and Development Institute of Traumatology and Orthopedics, Donetsk Regional Public Health Administration, and the Ministry of Emergency of Ukraine, a table-based tool was created, which, based on historical evidence, identifies relevant potential threats, evaluates their impacts and likelihoods on graded scales based on previous available data, identifies potential mitigating shortcomings, and recommends further mitigation measures. This risk assessment tool has been applied in the vulnerability-assessment-phase of the UEFA Euro 2012. Twenty-three sub-types of potential hazards were identified and analyzed. Ten specific hazards were recognized as likely to very likely to occur, including natural disasters, bombing and blast events, road traffic collisions, and disorderly conduct. Preventative measures, such as increased stadium security and zero tolerance for impaired driving, were recommended. Mitigating factors were suggested, including clear, incident-specific preparedness plans and enhanced inter-agency communication. This hazard risk assessment tool is a simple aid in vulnerability assessment, essential for disaster preparedness and response, and may be applied broadly to future international events.

  5. Implementation of Risk Management in NASA's CEV Project- Ensuring Mission Success

    NASA Astrophysics Data System (ADS)

    Perera, Jeevan; Holsomback, Jerry D.

    2005-12-01

    Most project managers know that Risk Management (RM) is essential to good project management. At NASA, standards and procedures to manage risk through a tiered approach have been developed - from the global agency-wide requirements down to a program or project's implementation. The basic methodology for NASA's risk management strategy includes processes to identify, analyze, plan, track, control, communicate and document risks. The identification, characterization, mitigation plan, and mitigation responsibilities associated with specific risks are documented to help communicate, manage, and effectuate appropriate closure. This approach helps to ensure more consistent documentation and assessment and provides a means of archiving lessons learned for future identification or mitigation activities.A new risk database and management tool was developed by NASA in 2002 and since has been used successfully to communicate, document and manage a number of diverse risks for the International Space Station, Space Shuttle, and several other NASA projects and programs including at the Johnson Space Center. Organizations use this database application to effectively manage and track each risk and gain insight into impacts from other organization's viewpoint to develop integrated solutions. Schedule, cost, technical and safety issues are tracked in detail through this system.Risks are tagged within the system to ensure proper review, coordination and management at the necessary management level. The database is intended as a day-to- day tool for organizations to manage their risks and elevate those issues that need coordination from above. Each risk is assigned to a managing organization and a specific risk owner who generates mitigation plans as appropriate. In essence, the risk owner is responsible for shepherding the risk through closure. The individual that identifies a new risk does not necessarily get assigned as the risk owner. Whoever is in the best position to effectuate comprehensive closure is assigned as the risk owner. Each mitigation plan includes the specific tasks that will be conducted to either decrease the likelihood of the risk occurring and/or lessen the severity of the consequences if they do occur. As each mitigation task is completed, the responsible managing organization records the completion of the task in the risk database and then re-scores the risk considering the task's results. By keeping scores updated, a managing organization's current top risks and risk posture can be readily identified including the status of any risk in the system.A number of metrics measure risk process trends from data contained in the database. This allows for trend analysis to further identify improvements to the process and assist in the management of all risks. The metrics will also scrutinize both the effectiveness and compliance of risk management requirements.The risk database is an evolving tool and will be continuously improved with capabilities requested by the NASA project community. This paper presents the basic foundations of risk management, the elements necessary for effective risk management, and the capabilities of this new risk database and how it is implemented to support NASA's risk management needs.

  6. Willow Creek Wildlife Mitigation Project. Final Environmental Assessment.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1995-04-01

    Today`s notice announces BPA`s proposal to fund land acquisition or acquisition of a conservation easement and a wildlife management plan to protect and enhance wildlife habitat at the Willow Creek Natural Area in Eugene, Oregon. This action would provide partial mitigation for wildlife and wildlife habitat lost by the development of Federal hydroelectric projects in the Willamette River Basin. The project is consistent with BPA`s obligations under provisions of the Pacific Northwest Electric Power Planning and Conservation Act of 1980 as outlined by the Northwest Power Planning Council`s 1994 Columbia River Basin Fish and Wildlife Program. BPA has prepared anmore » environmental assessment (DOE/EA-1023) evaluating the proposed project. Based on the analysis in the EA, BPA has determined that the proposed action is not a major Federal action significantly affecting the quality of the human environment, within the meaning of the National Environmental Policy Act (NEPA) of 1969. Therefore, the preparation of an environmental impact statement (EIS) is not required and BPA is issuing this FONSI.« less

  7. System configuration management plan for 101-SY Hydrogen Mitigation Test Project Mini-Data Acquisition and Control System of Tank Waste Remediation System

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Vargo, G.F. Jr.

    1994-10-11

    The DOE Standard defines the configuration management program by the five basic program elements of ``program management,`` ``design requirements,`` ``document control,`` ``change control,`` and ``assessments,`` and the two adjunct recovery programs of ``design reconstitution,`` and ``material condition and aging management. The C-M model of five elements and two adjunct programs strengthen the necessary technical and administrative control to establish and maintain a consistent technical relationship among the requirements, physical configuration, and documentation. Although the DOE Standard was originally developed for the operational phase of nuclear facilities, this plan has the flexibility to be adapted and applied to all life-cycle phasesmore » of both nuclear and non-nuclear facilities. The configuration management criteria presented in this plan endorses the DOE Standard and has been tailored specifically to address the technical relationship of requirements, physical configuration, and documentation during the full life-cycle of the 101-SY Hydrogen Mitigation Test Project Mini-Data Acquisition and Control System of Tank Waste Remediation System.« less

  8. Using risk-based analysis and geographic information systems to assess flooding problems in an urban watershed in Rhode Island.

    PubMed

    Hardmeyer, Kent; Spencer, Michael A

    2007-04-01

    This article provides an overview of the use of risk-based analysis (RBA) in flood damage assessment, and it illustrates the use of Geographic Information Systems (GIS) in identifying flood-prone areas, which can aid in flood-mitigation planning assistance. We use RBA to calculate expected annual flood damages in an urban watershed in the state of Rhode Island, USA. The method accounts for the uncertainty in the three primary relationships used in computing flood damage: (1) the probability that a given flood will produce a given amount of floodwater, (2) the probability that a given amount of floodwater will reach a certain stage or height, and (3) the probability that a certain stage of floodwater will produce a given amount of damage. A greater than 50% increase in expected annual flood damage is estimated for the future if previous development patterns continue and flood-mitigation measures are not taken. GIS is then used to create a map that shows where and how often floods might occur in the future, which can help (1) identify priority areas for flood-mitigation planning assistance and (2) disseminate information to public officials and other decision-makers.

  9. An Operational Framework for Insecticide Resistance Management Planning

    PubMed Central

    Chanda, Emmanuel; Thomsen, Edward K.; Musapa, Mulenga; Kamuliwo, Mulakwa; Brogdon, William G.; Norris, Douglas E.; Masaninga, Freddie; Wirtz, Robert; Sikaala, Chadwick H.; Muleba, Mbanga; Craig, Allen; Govere, John M.; Ranson, Hilary; Hemingway, Janet; Seyoum, Aklilu; Macdonald, Michael B.

    2016-01-01

    Arthropod vectors transmit organisms that cause many emerging and reemerging diseases, and their control is reliant mainly on the use of chemical insecticides. Only a few classes of insecticides are available for public health use, and the increased spread of insecticide resistance is a major threat to sustainable disease control. The primary strategy for mitigating the detrimental effects of insecticide resistance is the development of an insecticide resistance management plan. However, few examples exist to show how to implement such plans programmatically. We describe the formulation and implementation of a resistance management plan for mosquito vectors of human disease in Zambia. We also discuss challenges, steps taken to address the challenges, and directions for the future. PMID:27089119

  10. An Operational Framework for Insecticide Resistance Management Planning.

    PubMed

    Chanda, Emmanuel; Thomsen, Edward K; Musapa, Mulenga; Kamuliwo, Mulakwa; Brogdon, William G; Norris, Douglas E; Masaninga, Freddie; Wirtz, Robert; Sikaala, Chadwick H; Muleba, Mbanga; Craig, Allen; Govere, John M; Ranson, Hilary; Hemingway, Janet; Seyoum, Aklilu; Macdonald, Michael B; Coleman, Michael

    2016-05-01

    Arthropod vectors transmit organisms that cause many emerging and reemerging diseases, and their control is reliant mainly on the use of chemical insecticides. Only a few classes of insecticides are available for public health use, and the increased spread of insecticide resistance is a major threat to sustainable disease control. The primary strategy for mitigating the detrimental effects of insecticide resistance is the development of an insecticide resistance management plan. However, few examples exist to show how to implement such plans programmatically. We describe the formulation and implementation of a resistance management plan for mosquito vectors of human disease in Zambia. We also discuss challenges, steps taken to address the challenges, and directions for the future.

  11. Climate change mitigation and adaptation in the land use sector: from complementarity to synergy.

    PubMed

    Duguma, Lalisa A; Minang, Peter A; van Noordwijk, Meine

    2014-09-01

    Currently, mitigation and adaptation measures are handled separately, due to differences in priorities for the measures and segregated planning and implementation policies at international and national levels. There is a growing argument that synergistic approaches to adaptation and mitigation could bring substantial benefits at multiple scales in the land use sector. Nonetheless, efforts to implement synergies between adaptation and mitigation measures are rare due to the weak conceptual framing of the approach and constraining policy issues. In this paper, we explore the attributes of synergy and the necessary enabling conditions and discuss, as an example, experience with the Ngitili system in Tanzania that serves both adaptation and mitigation functions. An in-depth look into the current practices suggests that more emphasis is laid on complementarity-i.e., mitigation projects providing adaptation co-benefits and vice versa rather than on synergy. Unlike complementarity, synergy should emphasize functionally sustainable landscape systems in which adaptation and mitigation are optimized as part of multiple functions. We argue that the current practice of seeking co-benefits (complementarity) is a necessary but insufficient step toward addressing synergy. Moving forward from complementarity will require a paradigm shift from current compartmentalization between mitigation and adaptation to systems thinking at landscape scale. However, enabling policy, institutional, and investment conditions need to be developed at global, national, and local levels to achieve synergistic goals.

  12. Northwest Montana Wildlife Habitat Enhancement: Hungry Horse Elk Mitigation Project: Monitoring and Evaluation Plan.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Casey, Daniel; Malta, Patrick

    Portions of two important elk (Cervus elaphus) winter ranges totalling 8749 acres were lost due to the construction of the Hungry Horse Dam hydroelectric facility. This habitat loss decreased the carrying capacity of the both the elk and the mule deer (Odocoileus hemionus). In 1985, using funds from the Bonneville Power Administration (BPA) as authorized by the Northwest Power Act, the Montana Department of Fish, Wildlife and Parks (FWP) completed a wildlife mitigation plan for Hungry Horse Reservoir. This plan identified habitat enhancement of currently-occupied winter range as the most cost-efficient, easily implemented mitigation alternative available to address these large-scalemore » losses of winter range. The Columbia Basin Fish and Wildlife Program, as amended in 1987, authorized BPA to fund winter range enhancement to meet an adjusted goal of 133 additional elk. A 28-month advance design phase of the BPA-funded project was initiated in September 1987. Primary goals of this phase of the project included detailed literature review, identification of enhancement areas, baseline (elk population and habitat) data collection, and preparation of 3-year and 10-year implementation plans. This document will serve as a site-specific habitat and population monitoring plan which outlines our recommendations for evaluating the results of enhancement efforts against mitigation goals. 25 refs., 13 figs., 7 tabs.« less

  13. Improving tsunami resiliency: California's Tsunami Policy Working Group

    USGS Publications Warehouse

    Real, Charles R.; Johnson, Laurie; Jones, Lucile M.; Ross, Stephanie L.; Kontar, Y.A.; Santiago-Fandiño, V.; Takahashi, T.

    2014-01-01

    California has established a Tsunami Policy Working Group to facilitate development of policy recommendations for tsunami hazard mitigation. The Tsunami Policy Working Group brings together government and industry specialists from diverse fields including tsunami, seismic, and flood hazards, local and regional planning, structural engineering, natural hazard policy, and coastal engineering. The group is acting on findings from two parallel efforts: The USGS SAFRR Tsunami Scenario project, a comprehensive impact analysis of a large credible tsunami originating from an M 9.1 earthquake in the Aleutian Islands Subduction Zone striking California’s coastline, and the State’s Tsunami Preparedness and Hazard Mitigation Program. The unique dual-track approach provides a comprehensive assessment of vulnerability and risk within which the policy group can identify gaps and issues in current tsunami hazard mitigation and risk reduction, make recommendations that will help eliminate these impediments, and provide advice that will assist development and implementation of effective tsunami hazard risk communication products to improve community resiliency.

  14. Director, Operational Test and Evaluation FY 2014 Annual Report

    DTIC Science & Technology

    2015-01-01

    Federal Departments and Agencies. Mitigation measures such as curtailment of wind turbine operations during test periods, identification of alternative...impact of wind turbines on ground-based and airborne radars, and this investment may help mitigate interference of wind turbines with test range...Frequency Active (SURTASS CLFA) Test Plan Tactical Unmanned Aircraft System Tactical Common Data Link (Shadow) FOT&E OTA Test Plan Tempest Wind 2014

  15. Goals, obstacles and effective strategies of wildfire mitigation programs in the Wildland-Urban Interface

    Treesearch

    Margaret A. Reams; Terry K. Haines; Cheryl R. Renner; Michael W. Wascom; Harish Kingre

    2005-01-01

    The dramatic expansion into the Wildland–Urban Interface (WUI) places property, natural assets, and human life at risk from wildfire destruction. The U.S. National Fire Plan encourages communities to implement laws and outreach programs for pre-fire planning to mitigate the risk to area residents. Starting in 2003, we surveyed the administrators of regulatory and...

  16. Integrating ecosystem-service tradeoffs into land-use decisions

    PubMed Central

    Goldstein, Joshua H.; Caldarone, Giorgio; Duarte, Thomas Kaeo; Ennaanay, Driss; Hannahs, Neil; Mendoza, Guillermo; Polasky, Stephen; Wolny, Stacie; Daily, Gretchen C.

    2012-01-01

    Recent high-profile efforts have called for integrating ecosystem-service values into important societal decisions, but there are few demonstrations of this approach in practice. We quantified ecosystem-service values to help the largest private landowner in Hawaii, Kamehameha Schools, design a land-use development plan that balances multiple private and public values on its North Shore land holdings (Island of O’ahu) of ∼10,600 ha. We used the InVEST software tool to evaluate the environmental and financial implications of seven planning scenarios encompassing contrasting land-use combinations including biofuel feedstocks, food crops, forestry, livestock, and residential development. All scenarios had positive financial return relative to the status quo of negative return. However, tradeoffs existed between carbon storage and water quality as well as between environmental improvement and financial return. Based on this analysis and community input, Kamehameha Schools is implementing a plan to support diversified agriculture and forestry. This plan generates a positive financial return ($10.9 million) and improved carbon storage (0.5% increase relative to status quo) with negative relative effects on water quality (15.4% increase in potential nitrogen export relative to status quo). The effects on water quality could be mitigated partially (reduced to a 4.9% increase in potential nitrogen export) by establishing vegetation buffers on agricultural fields. This plan contributes to policy goals for climate change mitigation, food security, and diversifying rural economic opportunities. More broadly, our approach illustrates how information can help guide local land-use decisions that involve tradeoffs between private and public interests. PMID:22529388

  17. Integrating ecosystem-service tradeoffs into land-use decisions.

    PubMed

    Goldstein, Joshua H; Caldarone, Giorgio; Duarte, Thomas Kaeo; Ennaanay, Driss; Hannahs, Neil; Mendoza, Guillermo; Polasky, Stephen; Wolny, Stacie; Daily, Gretchen C

    2012-05-08

    Recent high-profile efforts have called for integrating ecosystem-service values into important societal decisions, but there are few demonstrations of this approach in practice. We quantified ecosystem-service values to help the largest private landowner in Hawaii, Kamehameha Schools, design a land-use development plan that balances multiple private and public values on its North Shore land holdings (Island of O'ahu) of ∼10,600 ha. We used the InVEST software tool to evaluate the environmental and financial implications of seven planning scenarios encompassing contrasting land-use combinations including biofuel feedstocks, food crops, forestry, livestock, and residential development. All scenarios had positive financial return relative to the status quo of negative return. However, tradeoffs existed between carbon storage and water quality as well as between environmental improvement and financial return. Based on this analysis and community input, Kamehameha Schools is implementing a plan to support diversified agriculture and forestry. This plan generates a positive financial return ($10.9 million) and improved carbon storage (0.5% increase relative to status quo) with negative relative effects on water quality (15.4% increase in potential nitrogen export relative to status quo). The effects on water quality could be mitigated partially (reduced to a 4.9% increase in potential nitrogen export) by establishing vegetation buffers on agricultural fields. This plan contributes to policy goals for climate change mitigation, food security, and diversifying rural economic opportunities. More broadly, our approach illustrates how information can help guide local land-use decisions that involve tradeoffs between private and public interests.

  18. Cities and “budget-based” management of the energy-water-climate nexus: Case studies in transportation policy, infrastructure systems, and urban utility risk management

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sperling, Joshua B.; Ramaswami, Anu

    This article reviews city case studies to inform a framework for developing urban infrastructure design standards and policy instruments that together aim to pursue energy efficiency and greenhouse gas mitigation through city carbon budgets and water use efficiency and climate risk adaptation through city water budgets. Here, this article also proposes combining carbon and water budgeting at the city-scale for achieving successful coupled city carbon and water budget (CCCWB) programs. Under a CCCWB program, key actors including local governments, infrastructure designers/operators, and households would be assigned a GHG emissions and water 'budget' and be required by state or federal levelsmore » to keep within this budget through the use of flexibility mechanisms, incentive programs, and sanctions. Multiple incentives and cross-scale governance arrangements would be tied to energy-water systems integration, resource-efficient transportation and infrastructure development, and effective monitoring and management of energy use, emissions, climate risks to, and security of energy-water-transport-food and other critical systems. As a first step to promote strategies for CCCWB development, we systematically review approaches of and shortcomings to existing budget-based programs in the UK and US, and suggest improvements in three areas: measurement, modeling effectiveness of interventions for staying within a budget, and governance. To date, the majority of climate action or sustainability plans by cities, while mentioning climate impacts as a premise for the plan, do not address these impacts in the plan. They focus primarily on GHG mitigation while ignoring resource depletion challenges and energy-climate-water linkages, whereby water supplies can begin to limit energy production and energy shifts to mitigate climate change can limit water availability. Coupled carbon-water budget plans, programs, and policies - described in this study- may address these concerns as well as the emerging trends that will exacerbate these problems - e.g., including population growth, climatic changes, and emerging policy choices that are not coordinated. Cities and 'Budget-Based' Management of the Energy-Water-Climate Nexus: Case Studies to Inform Strategy for Integrated Performance- and Incentive-Based Design and Policy Instruments.« less

  19. Cities and “budget-based” management of the energy-water-climate nexus: Case studies in transportation policy, infrastructure systems, and urban utility risk management

    DOE PAGES

    Sperling, Joshua B.; Ramaswami, Anu

    2017-11-03

    This article reviews city case studies to inform a framework for developing urban infrastructure design standards and policy instruments that together aim to pursue energy efficiency and greenhouse gas mitigation through city carbon budgets and water use efficiency and climate risk adaptation through city water budgets. Here, this article also proposes combining carbon and water budgeting at the city-scale for achieving successful coupled city carbon and water budget (CCCWB) programs. Under a CCCWB program, key actors including local governments, infrastructure designers/operators, and households would be assigned a GHG emissions and water 'budget' and be required by state or federal levelsmore » to keep within this budget through the use of flexibility mechanisms, incentive programs, and sanctions. Multiple incentives and cross-scale governance arrangements would be tied to energy-water systems integration, resource-efficient transportation and infrastructure development, and effective monitoring and management of energy use, emissions, climate risks to, and security of energy-water-transport-food and other critical systems. As a first step to promote strategies for CCCWB development, we systematically review approaches of and shortcomings to existing budget-based programs in the UK and US, and suggest improvements in three areas: measurement, modeling effectiveness of interventions for staying within a budget, and governance. To date, the majority of climate action or sustainability plans by cities, while mentioning climate impacts as a premise for the plan, do not address these impacts in the plan. They focus primarily on GHG mitigation while ignoring resource depletion challenges and energy-climate-water linkages, whereby water supplies can begin to limit energy production and energy shifts to mitigate climate change can limit water availability. Coupled carbon-water budget plans, programs, and policies - described in this study- may address these concerns as well as the emerging trends that will exacerbate these problems - e.g., including population growth, climatic changes, and emerging policy choices that are not coordinated. Cities and 'Budget-Based' Management of the Energy-Water-Climate Nexus: Case Studies to Inform Strategy for Integrated Performance- and Incentive-Based Design and Policy Instruments.« less

  20. Estimating the potential of energy saving and carbon emission mitigation of cassava-based fuel ethanol using life cycle assessment coupled with a biogeochemical process model.

    PubMed

    Jiang, Dong; Hao, Mengmeng; Fu, Jingying; Tian, Guangjin; Ding, Fangyu

    2017-09-14

    Global warming and increasing concentration of atmospheric greenhouse gas (GHG) have prompted considerable interest in the potential role of energy plant biomass. Cassava-based fuel ethanol is one of the most important bioenergy and has attracted much attention in both developed and developing countries. However, the development of cassava-based fuel ethanol is still faced with many uncertainties, including raw material supply, net energy potential, and carbon emission mitigation potential. Thus, an accurate estimation of these issues is urgently needed. This study provides an approach to estimate energy saving and carbon emission mitigation potentials of cassava-based fuel ethanol through LCA (life cycle assessment) coupled with a biogeochemical process model-GEPIC (GIS-based environmental policy integrated climate) model. The results indicate that the total potential of cassava yield on marginal land in China is 52.51 million t; the energy ratio value varies from 0.07 to 1.44, and the net energy surplus of cassava-based fuel ethanol in China is 92,920.58 million MJ. The total carbon emission mitigation from cassava-based fuel ethanol in China is 4593.89 million kgC. Guangxi, Guangdong, and Fujian are identified as target regions for large-scale development of cassava-based fuel ethanol industry. These results can provide an operational approach and fundamental data for scientific research and energy planning.

  1. Estimating the potential of energy saving and carbon emission mitigation of cassava-based fuel ethanol using life cycle assessment coupled with a biogeochemical process model

    NASA Astrophysics Data System (ADS)

    Jiang, Dong; Hao, Mengmeng; Fu, Jingying; Tian, Guangjin; Ding, Fangyu

    2017-09-01

    Global warming and increasing concentration of atmospheric greenhouse gas (GHG) have prompted considerable interest in the potential role of energy plant biomass. Cassava-based fuel ethanol is one of the most important bioenergy and has attracted much attention in both developed and developing countries. However, the development of cassava-based fuel ethanol is still faced with many uncertainties, including raw material supply, net energy potential, and carbon emission mitigation potential. Thus, an accurate estimation of these issues is urgently needed. This study provides an approach to estimate energy saving and carbon emission mitigation potentials of cassava-based fuel ethanol through LCA (life cycle assessment) coupled with a biogeochemical process model—GEPIC (GIS-based environmental policy integrated climate) model. The results indicate that the total potential of cassava yield on marginal land in China is 52.51 million t; the energy ratio value varies from 0.07 to 1.44, and the net energy surplus of cassava-based fuel ethanol in China is 92,920.58 million MJ. The total carbon emission mitigation from cassava-based fuel ethanol in China is 4593.89 million kgC. Guangxi, Guangdong, and Fujian are identified as target regions for large-scale development of cassava-based fuel ethanol industry. These results can provide an operational approach and fundamental data for scientific research and energy planning.

  2. Closing the prediction gap between agricultural nutrient losses and riparian zone ecology

    USDA-ARS?s Scientific Manuscript database

    The ecological health of the Chesapeake Bay is an ongoing concern and, as the more obvious and direct contributors are mitigated, focus is moving upstream to the agricultural headwaters of the basin. TMDLs and Watershed Implementation Plans (WIPs) have been developed by all states in the basin to co...

  3. The US Food and Drug Administration's Risk Evaluation and Mitigation Strategy (REMS) Program - Current Status and Future Direction.

    PubMed

    Wu, Jasmanda; Juhaeri, Juhaeri

    2016-12-01

    The US Food and Drug Administration (FDA) Amendments Act of 2007 granted the FDA new authorities to enhance drug safety by requiring application holders to submit a proposed Risk Evaluation and Mitigation Strategy (REMS). A REMS is a required risk management plan that uses tools beyond the package insert. REMS elements may include a medication guide and patient package insert for patients and a communication plan focused on health care professionals. Elements to assure safe use (ETASUs) are put in place to mitigate a specific known serious risk when other less restrictive elements of a REMS are not sufficient to mitigate such risk. An implementation system is required for an REMS that includes the ETASUs. With approximately eight years of experience with REMS programs, many health care settings have created systems to manage REMS and also to integrate REMS into their practice settings. At the same time, there are issues associated with the development and implementation of REMS. In 2011, FDA created the REMS Integration Initiative to develop guidance on how to apply statutory criteria to determine when a REMS is required, to improve standardization and assessment of REMS, and to improve integration of REMS into the existing healthcare system. A key component of the REMS Integration Initiative is stakeholder outreach to better understand how existing REMS programs are working and to identify opportunities for improvement. This review attempts to share our company's experience with the REMS program, and to provide updates on FDA's efforts to improve REMS communication, to standardize REMS process, to reduce REMS program burdens and to build a common REMS platform. Copyright © 2016 Elsevier HS Journals, Inc. All rights reserved.

  4. Software for Probabilistic Risk Reduction

    NASA Technical Reports Server (NTRS)

    Hensley, Scott; Michel, Thierry; Madsen, Soren; Chapin, Elaine; Rodriguez, Ernesto

    2004-01-01

    A computer program implements a methodology, denoted probabilistic risk reduction, that is intended to aid in planning the development of complex software and/or hardware systems. This methodology integrates two complementary prior methodologies: (1) that of probabilistic risk assessment and (2) a risk-based planning methodology, implemented in a prior computer program known as Defect Detection and Prevention (DDP), in which multiple requirements and the beneficial effects of risk-mitigation actions are taken into account. The present methodology and the software are able to accommodate both process knowledge (notably of the efficacy of development practices) and product knowledge (notably of the logical structure of a system, the development of which one seeks to plan). Estimates of the costs and benefits of a planned development can be derived. Functional and non-functional aspects of software can be taken into account, and trades made among them. It becomes possible to optimize the planning process in the sense that it becomes possible to select the best suite of process steps and design choices to maximize the expectation of success while remaining within budget.

  5. Review of dust transport and mitigation technologies in lunar and Martian atmospheres

    NASA Astrophysics Data System (ADS)

    Afshar-Mohajer, Nima; Wu, Chang-Yu; Curtis, Jennifer Sinclair; Gaier, James R.

    2015-09-01

    Dust resuspension and deposition is a ubiquitous phenomenon in all lunar and Martian missions. The near-term plans to return to the Moon as a stepping stone to further exploration of Mars and beyond bring scientists' attention to development and evaluation of lunar and Martian dust mitigation technologies. In this paper, different lunar and Martian dust transport mechanisms are presented, followed by a review of previously developed dust mitigation technologies including fluidal, mechanical, electrical and passive self-cleaning methods for lunar/Martian installed surfaces along with filtration for dust control inside cabins. Key factors in choosing the most effective dust mitigation technology are recognized to be the dust transport mechanism, energy consumption, environment, type of surface materials, area of the surface and surface functionality. While electrical methods operating at higher voltages are identified to be suitable for small but light sensitive surfaces, pre-treatment of the surface is effective for cleaning thermal control surfaces, and mechanical methods are appropriate for surfaces with no concerns of light blockage, surface abrasion and 100% cleaning efficiency. Findings from this paper can help choose proper surface protection/cleaning for future space explorations. Hybrid techniques combining the advantages of different methods are recommended.

  6. A multi-model assessment of the co-benefits of climate mitigation for global air quality

    NASA Astrophysics Data System (ADS)

    Rao, Shilpa; Klimont, Zbigniew; Leitao, Joana; Riahi, Keywan; van Dingenen, Rita; Aleluia Reis, Lara; Calvin, Katherine; Dentener, Frank; Drouet, Laurent; Fujimori, Shinichiro; Harmsen, Mathijs; Luderer, Gunnar; Heyes, Chris; Strefler, Jessica; Tavoni, Massimo; van Vuuren, Detlef P.

    2016-12-01

    We present a model comparison study that combines multiple integrated assessment models with a reduced-form global air quality model to assess the potential co-benefits of global climate mitigation policies in relation to the World Health Organization (WHO) goals on air quality and health. We include in our assessment, a range of alternative assumptions on the implementation of current and planned pollution control policies. The resulting air pollution emission ranges significantly extend those in the Representative Concentration Pathways. Climate mitigation policies complement current efforts on air pollution control through technology and fuel transformations in the energy system. A combination of stringent policies on air pollution control and climate change mitigation results in 40% of the global population exposed to PM levels below the WHO air quality guideline; with the largest improvements estimated for India, China, and Middle East. Our results stress the importance of integrated multisector policy approaches to achieve the Sustainable Development Goals.

  7. Mitigating Undesignated Trail Use: The Efficacy of Messaging and Direct Site Management Actions in an Urban-Proximate Open Space Context.

    PubMed

    Schwartz, F; Taff, B D; Lawhon, B; VanderWoude, D

    2018-05-08

    The use and creation of undesignated recreational trails can lead to erosion, vegetation damage, unsafe trail conditions, and impacts to local wildlife. The mitigation of undesignated trail use is typically addressed indirectly through minimum-impact visitor education programs such as Leave No Trace, or directly through closures or sanctions. In this study, researchers collaborated with City of Boulder, Colorado Open Space and Mountain Parks (OSMP) staff to develop a quasi-experimental field study that examined the effectiveness of indirect (messaging) and direct (barriers) management approaches to mitigating undesignated trail use. The study applied a Theory of Planned Behavior framework, utilized Leave No Trace messaging, and employed a method to pair survey and direct observation data. A total of 2232 visitor parties were observed, and 147 surveys were collected. The combined direct (barrier) and indirect (messaging) intervention was the most effective at mitigating undesignated trail use. Implications for management and future research are discussed.

  8. Mitigation and Monitoring Plan for impacted wetlands at the Gunnison UMTRA Project site, Gunnison, Colorado. Revision 1

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1994-12-01

    The Gunnison, Colorado, abandoned uranium mill site is one site being cleaned up by the DOE under UMTRCA authority. This site`s contaminated material is being transported to a disposal site on US Bureau of Land Management (BLM) land east of Gunnison. Remedial action activities have temporarily disturbed 0.8 acre (ac) (0.3 hectares [ha]) of wetlands and permanently eliminated 4.3 ac (1.7 ha). As required by the Clean Water Act, the US Army Corps of Engineers (USACE) prepared a Section 404 Permit that addresses the loss of wetlands as a result of remedial action at the Gunnison UMTRA Project site. Themore » 404 permit includes this report as an attachment and it describes the wetland mitigation and monitoring plan. The DOE formulated this plan in consultation with the BLM and the USACE. This report represents a revised version of the mitigation and monitoring plan (DOE, 1992b).« less

  9. 30 CFR 250.223 - What mitigation measures information must accompany the EP?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 2 2010-07-01 2010-07-01 false What mitigation measures information must accompany the EP? 250.223 Section 250.223 Mineral Resources MINERALS MANAGEMENT SERVICE, DEPARTMENT OF THE... Contents of Exploration Plans (ep) § 250.223 What mitigation measures information must accompany the EP? (a...

  10. Alternative Fuels Data Center

    Science.gov Websites

    establishing a plan to allocate any funds the State receives from the Volkswagen Mitigation Trust Agreement Volkswagen Mitigation Trust Agreement; to offset oxides of nitrogen emissions from vehicles. For more

  11. The effectiveness of the mitigation hierarchy in environmental impact studies on marine ecosystems: A case study in France

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Jacob, Céline, E-mail: celine.jacob@cefe.cnrs.fr; CREOCEAN, Les Belvédères, Bâtiment B, 128, Avenue de Fès, 34080 Montpellier; Pioch, Sylvain, E-mail: sylvain.pioch@gmail.com

    While the development of maritime economic activity is increasingly encouraged, the consideration of its impacts constitutes a real challenge. The limitations of the implementation of the mitigation hierarchy have been widely discussed in scientific literature, yet data on marine biodiversity offset practices remains scarce. In this study, we investigated the use of Environmental Impact Assessments (EIAs) as suitable instruments to achieve the No Net Loss objective. Drawing on a French approach developed for the initial assessment of the European Marine Strategy Framework Directive, we examined the pressures and impacts related to various marine development projects and the effectiveness of themore » mitigation hierarchy in limiting these. An analysis of 55 recent French environmental impact studies showed that only 7% of the proposed measures had the aim of offsetting predicted degradation of sites of remarkable biodiversity. This can be partly explained by the lack of a clear definition of ‘significant impact’, which varies greatly depending on what is impacted, in turn allowing socio-economic activities to benefit more easily from offset. Furthermore, offsetting does not always constitute the final step of the mitigation hierarchy, highlighting the need to reinforce avoidance and reduction steps. Although we acknowledge the role of EIA in mitigating the negative impacts of development projects, synergies with other European marine environmental policies such as the Marine Strategy Framework Directive (MSFD) and the Maritime Spatial Planning directive (MSP) should be developed in order to improve current practices. - Highlights: • Avoidance measures were not well represented in the Environmental Impact Assessments studied. • Few significant residual impacts and measures to offset these were described. • Common biodiversity did not benefit from offset measures. • The equivalency of proposed marine offsets is questionable.« less

  12. The use of regional advance mitigation planning (RAMP) to integrate transportation infrastructure impacts with sustainability; a perspective from the USA

    NASA Astrophysics Data System (ADS)

    Thorne, James H.; Huber, Patrick R.; O'Donoghue, Elizabeth; Santos, Maria J.

    2014-05-01

    Globally, urban areas are expanding, and their regional, spatially cumulative, environmental impacts from transportation projects are not typically assessed. However, incorporation of a Regional Advance Mitigation Planning (RAMP) framework can promote more effective, ecologically sound, and less expensive environmental mitigation. As a demonstration of the first phase of the RAMP framework, we assessed environmental impacts from 181 planned transportation projects in the 19 368 km2 San Francisco Bay Area. We found that 107 road and railroad projects will impact 2411-3490 ha of habitat supporting 30-43 threatened or endangered species. In addition, 1175 ha of impacts to agriculture and native vegetation are expected, as well as 125 crossings of waterways supporting anadromous fish species. The extent of these spatially cumulative impacts shows the need for a regional approach to associated environmental offsets. Many of the impacts were comprised of numerous small projects, where project-by-project mitigation would result in increased transaction costs, land costs, and lost project time. Ecological gains can be made if a regional approach is taken through the avoidance of small-sized reserves and the ability to target parcels for acquisition that fit within conservation planning designs. The methods are straightforward, and can be used in other metropolitan areas.

  13. Research and Evaluations of the Health Aspects of Disasters, Part IX: Risk-Reduction Framework.

    PubMed

    Birnbaum, Marvin L; Daily, Elaine K; O'Rourke, Ann P; Loretti, Alessandro

    2016-06-01

    A disaster is a failure of resilience to an event. Mitigating the risks that a hazard will progress into a destructive event, or increasing the resilience of a society-at-risk, requires careful analysis, planning, and execution. The Disaster Logic Model (DLM) is used to define the value (effects, costs, and outcome(s)), impacts, and benefits of interventions directed at risk reduction. A Risk-Reduction Framework, based on the DLM, details the processes involved in hazard mitigation and/or capacity-building interventions to augment the resilience of a community or to decrease the risk that a secondary event will develop. This Framework provides the structure to systematically undertake and evaluate risk-reduction interventions. It applies to all interventions aimed at hazard mitigation and/or increasing the absorbing, buffering, or response capacities of a community-at-risk for a primary or secondary event that could result in a disaster. The Framework utilizes the structure provided by the DLM and consists of 14 steps: (1) hazards and risks identification; (2) historical perspectives and predictions; (3) selection of hazard(s) to address; (4) selection of appropriate indicators; (5) identification of current resilience standards and benchmarks; (6) assessment of the current resilience status; (7) identification of resilience needs; (8) strategic planning; (9) selection of an appropriate intervention; (10) operational planning; (11) implementation; (12) assessments of outputs; (13) synthesis; and (14) feedback. Each of these steps is a transformation process that is described in detail. Emphasis is placed on the role of Coordination and Control during planning, implementation of risk-reduction/capacity building interventions, and evaluation. Birnbaum ML , Daily EK , O'Rourke AP , Loretti A . Research and evaluations of the health aspects of disasters, part IX: Risk-Reduction Framework. Prehosp Disaster Med. 2016;31(3):309-325.

  14. Hungry Horse Mitigation; Flathead Lake, 2003-2004 Annual Report.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hansen, Barry; Evarts, Les

    2005-06-01

    The Confederated Salish and Kootenai Tribes (CSKT) and Montana Fish Wildlife and Parks (MFWP) wrote the ''Fisheries Mitigation Plan for Losses Attributable to the Construction and Operation of Hungry Horse Dam'' in March 1991 to define the fisheries losses, mitigation alternatives and recommendations to protect, mitigate and enhance resident fish and aquatic habitat affected by Hungry Horse Dam. On November 12, 1991, the Northwest Power Planning Council (NPPC) approved the mitigation plan with minor modifications, called for a detailed implementation plan, and amended measures 903(h)(1) through (7). A long-term mitigation plan was submitted in August 1992, was approved by themore » Council in 1993, and the first contract for this project was signed on November 11, 1993. The problem this project addresses is the loss of habitat, both in quality and quantity, in the Flathead Lake and River basin resulting from the construction and operation of Hungry Horse Dam. The purpose of the project is to both implement mitigation measures and monitor the biological responses to those measures including those implemented by Project Numbers 9101903 and 9101904. Goals and objectives of the 1994 Fish and Wildlife Program (Section 10.1) addressed by this project are the rebuilding to sustainable levels weak, but recoverable, native populations injured by the hydropower system. The project mitigates the blockage of spawning runs by Hungry Horse Dam by restoring and even creating spawning habitats within direct drainages to Flathead Lake. The project also addresses the altered habitat within Flathead Lake resulting from species shifts and consequent dominance of new species that restricts the potential success of mitigation measures. Specific goals of this project are to create and restore habitat and quantitatively monitor changes in fish populations to verify the efficacy of our mitigation measures. The project consists of three components: monitoring, restoration and research. Monitoring, for example, includes a spring gillnetting series conducted annually in Flathead Lake and builds on an existing data set initiated in 1981. Monitoring of the experimental kokanee reintroduction was a primary activity of this project between 1992 and 1997. Lake trout, whose high densities have precluded successful mitigation of losses of other species in Flathead Lake, have been monitored since 1996 to measure several biological parameters. Results of this work have utility in determining the population status of this key predator in Flathead Lake. The project has also defined the baseline condition of the Flathead Lake fishery in 1992-1993 and has conducted annual lakewide surveys since 1998. The restoration component of the project has addressed several stream channel, riparian, and fish passage problems, and suppression of non-native fish. The research component of the project began in FY 2000 and measured trophic linkages between M. relicta and other species to assist in predicting the results of our efforts to suppress lake trout. Only Objective 1 in the workplan is funded entirely by Hungry Horse Mitigation funds. Additional funds are drawn from other sources to assist in completion of Objectives 2-8.« less

  15. Hungry Horse Mitigation : Flathead Lake : Annual Progress Report 2007.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hansen, Barry; Evarts, Les

    2008-12-22

    The Confederated Salish and Kootenai Tribes (CSKT) and Montana Fish Wildlife and Parks (MFWP) wrote the 'Fisheries Mitigation Plan for Losses Attributable to the Construction and Operation of Hungry Horse Dam' in March 1991 to define the fisheries losses, mitigation alternatives and recommendations to protect, mitigate and enhance resident fish and aquatic habitat affected by Hungry Horse Dam. On November 12, 1991, the Northwest Power Planning Council (NPPC) approved the mitigation plan with minor modifications, called for a detailed implementation plan, and amended measures 903(h)(1) through (7). A long-term mitigation plan was submitted in August 1992, was approved by themore » Council in 1993, and the first contract for this project was signed on November 11, 1993. The problem this project addresses is the loss of habitat, both in quality and quantity, in the Flathead Lake and River basin resulting from the construction and operation of Hungry Horse Dam. The purpose of the project is to both implement mitigation measures and monitor the biological responses to those measures including those implemented by Project Numbers 9101903 and 9101904. Goals and objectives of the 1994 Fish and Wildlife Program (Section 10.1) addressed by this project are the rebuilding to sustainable levels weak, but recoverable, native populations injured by the hydropower system. The project mitigates the blockage of spawning runs by Hungry Horse Dam by restoring and even creating spawning habitats within direct drainages to Flathead Lake. The project also addresses the altered habitat within Flathead Lake resulting from species shifts and consequent dominance of new species that restricts the potential success of mitigation measures. Specific goals of this project are to create and restore habitat and quantitatively monitor changes in fish populations to verify the efficacy of our mitigation measures. The project consists of three components: monitoring, restoration and research. Monitoring, for example, includes a spring gillnetting series conducted annually in Flathead Lake and builds on an existing data set initiated in 1981. Monitoring of the experimental kokanee reintroduction was a primary activity of this project between 1992 and 1997. Lake trout, whose high densities have precluded successful mitigation of losses of other species in Flathead Lake, have been monitored since 1996 to measure several biological parameters. Results of this work have utility in determining the population status of this key predator in Flathead Lake. The project has also defined the baseline condition of the Flathead Lake fishery in 1992-1993 and has conducted annual lakewide surveys since 1998. The restoration component of the project has addressed several stream channel, riparian, and fish passage problems, and suppression of non-native fish. The research component of the project began in FY 2000 and measured trophic linkages between M. relicta and other species to assist in predicting the results of our efforts to suppress lake trout. Only Work Element A in the Statement of Work is funded entirely by Hungry Horse Mitigation funds. Additional funds are drawn from other sources to assist in completion of all remaining Work Elements.« less

  16. Hungry Horse Mitigation; Flathead Lake, 2004-2005 Annual Report.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hansen, Barry; Evarts, Les

    2006-06-01

    The Confederated Salish and Kootenai Tribes (CSKT) and Montana Fish Wildlife and Parks (MFWP) wrote the ''Fisheries Mitigation Plan for Losses Attributable to the Construction and Operation of Hungry Horse Dam'' in March 1991 to define the fisheries losses, mitigation alternatives and recommendations to protect, mitigate and enhance resident fish and aquatic habitat affected by Hungry Horse Dam. On November 12, 1991, the Northwest Power Planning Council (NPPC) approved the mitigation plan with minor modifications, called for a detailed implementation plan, and amended measures 903(h)(1) through (7). A long-term mitigation plan was submitted in August 1992, was approved by themore » Council in 1993, and the first contract for this project was signed on November 11, 1993. The problem this project addresses is the loss of habitat, both in quality and quantity, in the Flathead Lake and River basin resulting from the construction and operation of Hungry Horse Dam. The purpose of the project is to both implement mitigation measures and monitor the biological responses to those measures including those implemented by Project Numbers 9101903 and 9101904. Goals and objectives of the 1994 Fish and Wildlife Program (Section 10.1) addressed by this project are the rebuilding to sustainable levels weak, but recoverable, native populations injured by the hydropower system. The project mitigates the blockage of spawning runs by Hungry Horse Dam by restoring and even creating spawning habitats within direct drainages to Flathead Lake. The project also addresses the altered habitat within Flathead Lake resulting from species shifts and consequent dominance of new species that restricts the potential success of mitigation measures. Specific goals of this project are to create and restore habitat and quantitatively monitor changes in fish populations to verify the efficacy of our mitigation measures. The project consists of three components: monitoring, restoration and research. Monitoring, for example, includes a spring gillnetting series conducted annually in Flathead Lake and builds on an existing data set initiated in 1981. Monitoring of the experimental kokanee reintroduction was a primary activity of this project between 1992 and 1997. Lake trout, whose high densities have precluded successful mitigation of losses of other species in Flathead Lake, have been monitored since 1996 to measure several biological parameters. Results of this work have utility in determining the population status of this key predator in Flathead Lake. The project has also defined the baseline condition of the Flathead Lake fishery in 1992-1993 and has conducted annual lakewide surveys since 1998. The restoration component of the project has addressed several stream channel, riparian, and fish passage problems, and suppression of non-native fish. The research component of the project began in FY 2000 and measured trophic linkages between M. relicta and other species to assist in predicting the results of our efforts to suppress lake trout. Only Work Element A in the Statement of Work is funded entirely by Hungry Horse Mitigation funds. Additional funds are drawn from other sources to assist in completion of all remaining Work Elements.« less

  17. Hungry Horse Mitigation : Flathead Lake : Annual Progress Report 2008.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hansen, Barry; Evarts, Les

    2009-08-06

    The Confederated Salish and Kootenai Tribes (CSKT) and Montana Fish Wildlife and Parks (MFWP) wrote the 'Fisheries Mitigation Plan for Losses Attributable to the Construction and Operation of Hungry Horse Dam' in March 1991 to define the fisheries losses, mitigation alternatives and recommendations to protect, mitigate and enhance resident fish and aquatic habitat affected by Hungry Horse Dam. On November 12, 1991, the Northwest Power Planning Council (NPPC) approved the mitigation plan with minor modifications, called for a detailed implementation plan, and amended measures 903(h)(1) through (7). A long-term mitigation plan was submitted in August 1992, was approved by themore » Council in 1993, and the first contract for this project was signed on November 11, 1993. The problem this project addresses is the loss of habitat, both in quality and quantity, in the Flathead Lake and River basin resulting from the construction and operation of Hungry Horse Dam. The purpose of the project is to both implement mitigation measures and monitor the biological responses to those measures including those implemented by Project Numbers 9101903 and 9101904. Goals and objectives of the 1994 Fish and Wildlife Program (Section 10.1) addressed by this project are the rebuilding to sustainable levels weak, but recoverable, native populations injured by the hydropower system. The project mitigates the blockage of spawning runs by Hungry Horse Dam by restoring and even creating spawning habitats within direct drainages to Flathead Lake. The project also addresses the altered habitat within Flathead Lake resulting from species shifts and consequent dominance of new species that restricts the potential success of mitigation measures. Specific goals of this project are to create and restore habitat and quantitatively monitor changes in fish populations to verify the efficacy of our mitigation measures. The project consists of three components: monitoring, restoration and research. Monitoring, for example, includes a spring gillnetting series conducted annually in Flathead Lake and builds on an existing data set initiated in 1981. Monitoring of the experimental kokanee reintroduction was a primary activity of this project between 1992 and 1997. Lake trout, whose high densities have precluded successful mitigation of losses of other species in Flathead Lake, have been monitored since 1996 to measure several biological parameters. Results of this work have utility in determining the population status of this key predator in Flathead Lake. The project has also defined the baseline condition of the Flathead Lake fishery in 1992-1993 and has conducted annual lakewide surveys since 1998. The restoration component of the project has addressed several stream channel, riparian, and fish passage problems, and suppression of non-native fish. The research component of the project began in FY 2000 and measured trophic linkages between M. relicta and other species to assist in predicting the results of our efforts to suppress lake trout. Only Work Element A in the Statement of Work is funded entirely by Hungry Horse Mitigation funds. Additional funds are drawn from other sources to assist in completion of all remaining Work Elements.« less

  18. Annual monitoring report for the Gunnison, Colorado, wetlands mitigation plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1995-10-01

    The US Department of Energy (DOE) administers the Uranium Mill Tailings Remedial Action (UMTRA) Project to clean up uranium mill tailings and other surface contamination at 24 abandoned uranium mill sites in 10 states. One of these abandoned mill sites is near the town of Gunnison, Colorado; surface remediation and the environmental impacts of remedial action are described in the Gunnison environmental assessment (EA) (DOE, 1992). Remedial action resulted in the elimination of 4.3 acres (ac) 1.7 hectares (ha) of wetlands and mitigation of this loss of wetlands is being accomplished through the enhance of 18.4 ac (7.5 ha) ofmore » riparian plant communities in six spring feed areas on Bureau of Land Management (BLM) land. The description of the impacted and mitigation wetlands is provided in the Mitigation and Monitoring Plan for Impacted Wetlands at the Gunnison UMTRA Project Site, Gunnison, Colorado (DOE, 1994), which is attached to the US Army corps of Engineers (USACE) Section 404 Permit. As part of the wetlands mitigation plan, the six mitigation wetlands were fenced in the fall of 1993 to exclude livestock grazing. Baseline of grazed conditions of the wetlands vegetation was determined during the summer of 1993 (DOE, 1994). A 5-year monitoring program of these six sites has been implemented to document the response of vegetation and wildlife to the exclusion of livestock. This annual monitoring report provides the results of the first year of the 5-year monitoring period.« less

  19. The Effect of Considering Environmental Aspect to Distribution Planning: A Case in Logistics SME

    NASA Astrophysics Data System (ADS)

    Prambudia, Yudha; Andrian Nur, Andri

    2016-01-01

    Environmental aspect is often neglected in traditional distribution planning process of a product. Especially in small-medium enterprises (SME) of developing countries where cost efficiency is the predominant factor. Bearing in mind that there is a large number of SME's performing logistics activities, the consideration of environmental aspect in their distribution planning process would be beneficial to climate change mitigation efforts. The purpose of this paper is to show the impact of environmental aspect should it be considered as a contributing factor in distribution planning. In this research, an adoption of CO2-emission factor in an SME's distribution planning in Indonesia was simulated. The outputs of distribution planning with and without the factor consideration are then compared. The result shows that adoption of CO2-emission factor would change the priority of delivery route.

  20. Columbia River Basin Fish and Wildlife Program Annual Implementation Work Plan for Fiscal Year 1994.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    United States. Bonneville Power Administration; Northwest Power Planning Council; Columbia Basin Fish and Wildlife Authority

    1994-02-01

    This document is part of Bonneville Power Administration`s program to protect, mitigate, and enhance fish and wildlife affected by the development and operation of hydroelectric facilities on the Columbia River and its tributaries. The Fiscal Year 1994 (FY 1994) Annual Implementation Work Plan (AIWP) presents Bonneville Power Administration`s (BPA`s) plan for implementation of the Columbia River Basin Fish and Wildlife Program (Program). The purpose of the Program is to guide BPA and other federal agencies in carrying out their responsibilities to protect, mitigate, and enhance fish and wildlife in the Columbia River Basin. Phase I began the work of salmonmore » recovery with certain fast-track measures completed in August 1991. Phase II dealt with Snake and Columbia river flow and salmon harvest and was completed in December 1991. Phase III dealt with system-wide habitat and salmon production issues and was completed in September 1992. Phase IV planning, focusing on resident fish and wildlife, began in August 1993, and was finished and adopted in November 1993. This report provides summaries of the ongoing and new projects for FY 1994 within the areas of juvenile migration, adult migration, salmon harvest, production and habitat, coordinated implementation, monitoring and evaluation, resident fish, and wildlife.« less

  1. 2012 NEHA/UL sabbatical report: vulnerability to potential impacts of climate change: adaptation and risk communication strategies for environmental health practitioners in the United Kingdom.

    PubMed

    Ratnapradipa, Dhitinut

    2014-04-01

    Climate change risk assessment, adaptation, and mitigation planning have become increasingly important to environmental health practitioners (EHPs). The NEHA/UL Sabbatical Exchange Award allowed me to investigate how EHPs in the UK are incorporating climate change planning and communication strategies into their work. Projected climate change risks in the UK include flooding, extreme heat, water shortages, severe weather, decreased air quality, and changes in vectors. Despite public perception and funding challenges, all the local government representatives with whom I met incorporated climate change risk assessment, adaptation, and mitigation planning into their work. The mandated Community Risk Register serves as a key planning document developed by each local government authority and is a meaningful way to look at potential climate change health risks. Adaptation and sustainability were common threads in my meetings. These often took the form of "going green" with transportation, energy efficiency, conserving resources, and building design because the efforts made sense monetarily as future cost savings. Communication strategies targeted a variety of audiences (EHPs, non-EHP government employees, politicians, and the general public) using a broad range of communication channels (professional training, lobbying, conferences and fairs, publications, print materials, Internet resources, social media, billboards, etc).

  2. Validation of a Fast-Response Urban Micrometeorological Model to Assess the Performance of Urban Heat Island Mitigation Strategies

    NASA Astrophysics Data System (ADS)

    Nadeau, D.; Girard, P.; Overby, M.; Pardyjak, E.; Stoll, R., II; Willemsen, P.; Bailey, B.; Parlange, M. B.

    2015-12-01

    Urban heat islands (UHI) are a real threat in many cities worldwide and mitigation measures have become a central component of urban planning strategies. Even within a city, causes of UHI vary from one neighborhood to another, mostly due the spatial variability in surface thermal properties, building geometry, anthropogenic heat flux releases and vegetation cover. As a result, the performance of UHI mitigation measures also varies in space. Hence, there is a need to develop a tool to quantify the efficiency of UHI mitigation measures at the neighborhood scale. The objective of this ongoing study is to validate the fast-response micrometeorological model QUIC EnvSim (QES). This model can provide all information required for UHI studies with a fine spatial resolution (up to 0.5m) and short computation time. QES combines QUIC, a CFD-based wind solver and dispersion model, and EnvSim, composed of a radiation model, a land-surface model and a turbulent transport model. Here, high-resolution (1 m) simulations are run over a subset of the École Polytechnique Fédérale de Lausanne (EPFL) campus including complex buildings, various surfaces properties and vegetation. For nearly five months in 2006-07, a dense network of meteorological observations (92 weather stations over 0.1 km2) was deployed over the campus and these unique data are used here as a validation dataset. We present validation results for different test cases (e.g., sunny vs cloudy days, different incoming wind speeds and directions) and explore the effect of a few UHI mitigation strategies on the spatial distribution of near-surface air temperatures. Preliminary results suggest that QES may be a valuable tool in decision-making regarding adaptation of urban planning to UHI.

  3. Quantifying Land and People Exposed to Sea-Level Rise with No Mitigation and 1.5°C and 2.0°C Rise in Global Temperatures to Year 2300

    NASA Astrophysics Data System (ADS)

    Brown, S.; Nicholls, R. J.; Goodwin, P.; Haigh, I. D.; Lincke, D.; Vafeidis, A. T.; Hinkel, J.

    2018-03-01

    We use multiple synthetic mitigation sea-level scenarios, together with a non-mitigation sea-level scenario from the Warming Acidification and Sea-level Projector model. We find sea-level rise (SLR) continues to accelerate post-2100 for all but the most aggressive mitigation scenarios indicative of 1.5°C and 2.0°C. Using the Dynamic Interactive Vulnerability Assessment modeling framework, we project land and population exposed in the 1 in 100 year coastal flood plain under SLR and population change. In 2000, the flood plain is estimated at 540 × 103 km2. By 2100, under the mitigation scenarios, it ranges between 610 × 103 and 640 × 103 km2 (580 × 103 and 700 × 103 km2 for the 5th and 95th percentiles). Thus differences between the mitigation scenarios are small in 2100. However, in 2300, flood plains are projected to increase to between 700 × 103 and 960 × 103 km2 in 2300 (610 × 103 and 1290 × 103 km2) for the mitigation scenarios, but 1630 × 103 km2 (1190 × 103 and 2220 × 103 km2) for the non-mitigation scenario. The proportion of global population exposed to SLR in 2300 is projected to be between 1.5% and 5.4% (1.2%-7.6%) (assuming no population growth after 2100) for the aggressive mitigation and the non-mitigation scenario, respectively. Hence over centennial timescales there are significant benefits to climate change mitigation and temperature stabilization. However, sea-levels will continue to rise albeit at lower rates. Thus potential impacts will keep increasing necessitating adaptation to existing coastal infrastructure and the careful planning of new coastal developments.

  4. 33 CFR 155.1052 - Response plan development and evaluation criteria for vessels carrying group V petroleum oil as a...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ...) Sources of the equipment and supplies necessary to locate, recover, and mitigate such a discharge. (b... salvage company with appropriate expertise and equipment; and (2) A company with vessel firefighting... or operators must identify intended sources of the resources required under paragraph (e) of this...

  5. 78 FR 7445 - Notice of Intent To Prepare a Draft Environmental Impact Statement for a General Conservation...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-01

    ... Plan for the American Burying Beetle for Pipelines and Well Field Development in Oklahoma and Texas..., operation, and repair of oil and gas pipelines, and related well field activities. Individual oil and gas... pipelines and related well field activities, and will include measures necessary to minimize and mitigate...

  6. Mapping paddy rice area and yields over Thai Binh province in Viet Nam from MODIS, Landsat and ALOS-2/PALSAR-2

    USDA-ARS?s Scientific Manuscript database

    Rice is the most important staple crop grown and consumed in Southeast Asia. Timely and reliable rice production estimates are therefore important in monitoring government development plans in the region and in mitigating the effects of extreme weather and climate change to address food insecurity. ...

  7. Business Continuity Management Plan

    DTIC Science & Technology

    2014-12-01

    organization ( Shaw , 2004). Navy Supply Systems Command (NAVSUP) does not have a framework that can help develop a business continuity management (BCM...cites two case studies that demonstrate how an organization mitigated issues during catastrophic events that led to disruptions to their business ...www.uschamber.com/sites/default/files/legacy/ issues /defense/files/guideli nesbc.pdf Comprehensive Emergency Management Associates. (2006). Business continuity

  8. SU-E-J-15: A Patient-Centered Scheme to Mitigate Impacts of Treatment Setup Error

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Yang, L; Southern Medical University, Guangzhou; Tian, Z

    2014-06-01

    Purpose: Current Intensity Modulated Radiation Therapy (IMRT) is plan-centered. At each treatment fraction, we position the patient to match the setup in treatment plan. Inaccurate setup can compromise delivered dose distribution, and hence leading to suboptimal treatments. Moreover, current setup approach via couch shift under image guidance can correct translational errors, while rotational and deformation errors are hard to address. To overcome these problems, we propose in this abstract a patient-centered scheme to mitigate impacts of treatment setup errors. Methods: In the patient-centered scheme, we first position the patient on the couch approximately matching the planned-setup. Our Supercomputing Online Replanningmore » Environment (SCORE) is then employed to design an optimal treatment plan based on the daily patient geometry. It hence mitigates the impacts of treatment setup error and reduces the requirements on setup accuracy. We have conducted simulations studies in 10 head-and-neck (HN) patients to investigate the feasibility of this scheme. Rotational and deformation setup errors were simulated. Specifically, 1, 3, 5, 7 degrees of rotations were put on pitch, roll, and yaw directions; deformation errors were simulated by splitting neck movements into four basic types: rotation, lateral bending, flexion and extension. Setup variation ranges are based on observed numbers in previous studies. Dosimetric impacts of our scheme were evaluated on PTVs and OARs in comparison with original plan dose with original geometry and original plan recalculated dose with new setup geometries. Results: With conventional plan-centered approach, setup error could lead to significant PTV D99 decrease (−0.25∼+32.42%) and contralateral-parotid Dmean increase (−35.09∼+42.90%). The patientcentered approach is effective in mitigating such impacts to 0∼+0.20% and −0.03∼+5.01%, respectively. Computation time is <128 s. Conclusion: Patient-centered scheme is proposed to mitigate setup error impacts using replanning. Its superiority in terms of dosimetric impacts and feasibility has been shown through simulation studies on HN cases.« less

  9. Problems with mitigation translocation of herpetofauna.

    PubMed

    Sullivan, Brian K; Nowak, Erika M; Kwiatkowski, Matthew A

    2015-02-01

    Mitigation translocation of nuisance animals is a commonly used management practice aimed at resolution of human-animal conflict by removal and release of an individual animal. Long considered a reasonable undertaking, especially by the general public, it is now known that translocated subjects are negatively affected by the practice. Mitigation translocation is typically undertaken with individual adult organisms and has a much lower success rate than the more widely practiced conservation translocation of threatened and endangered species. Nonetheless, the public and many conservation practitioners believe that because population-level conservation translocations have been successful that mitigation translocation can be satisfactorily applied to a wide variety of human-wildlife conflict situations. We reviewed mitigation translocations of reptiles, including our own work with 3 long-lived species (Gila monsters [Heloderma suspectum], Sonoran desert tortoises [Gopherus morafkai], and western diamond-backed rattlesnakes [Crotalus atrox]). Overall, mitigation translocation had a low success rate when judged either by effects on individuals (in all studies reviewed they exhibited increased movement or increased mortality) or by the success of the resolution of the human-animal conflict (translocated individuals often returned to the capture site). Careful planning and identification of knowledge gaps are critical to increasing success rates in mitigation translocations in the face of increasing pressure to find solutions for species threatened by diverse anthropogenic factors, including climate change and exurban and energy development. © 2014 Society for Conservation Biology.

  10. Material hardship and children's social-emotional development: Testing mitigating effects of Child Development Accounts in a randomized experiment.

    PubMed

    Huang, J; Kim, Y; Sherraden, M

    2017-01-01

    Research has established a negative association between household material hardship and children's mental health. This study examines whether Child Development Accounts (CDAs), an economic intervention that encourages families to accumulate assets for children's long-term development, mitigate the association between material hardship and children's social-emotional development. Researchers conducted a randomized experiment of CDAs in Oklahoma, USA, with a probability sample (N = 7328) of all infants born in two 3-month periods in 2007. After agreeing to participate in the experiment, caregivers of 2704 infants completed a baseline survey and were assigned randomly to the treatment (n = 1358) or control group (n = 1346). The intervention exposed the treatment group to a CDA, which consisted of an Oklahoma 529 College Savings Plan account, financial incentives and financial information. Material hardship has a negative association with the social-emotional development of children around the age of 4 years. Estimates from regression analysis indicate that CDAs mitigate about 50% of the negative association between material hardship and children's social-emotional development. Although they do not provide direct support for consumption in households experiencing material hardship, CDAs may improve child development by influencing parenting practices and parents' expectations for their children. We discuss the implications of using asset-building programmes to improve child development. © 2016 John Wiley & Sons Ltd.

  11. Tsunami evacuation plans for future megathrust earthquakes in Padang, Indonesia, considering stochastic earthquake scenarios

    NASA Astrophysics Data System (ADS)

    Muhammad, Ario; Goda, Katsuichiro; Alexander, Nicholas A.; Kongko, Widjo; Muhari, Abdul

    2017-12-01

    This study develops tsunami evacuation plans in Padang, Indonesia, using a stochastic tsunami simulation method. The stochastic results are based on multiple earthquake scenarios for different magnitudes (Mw 8.5, 8.75, and 9.0) that reflect asperity characteristics of the 1797 historical event in the same region. The generation of the earthquake scenarios involves probabilistic models of earthquake source parameters and stochastic synthesis of earthquake slip distributions. In total, 300 source models are generated to produce comprehensive tsunami evacuation plans in Padang. The tsunami hazard assessment results show that Padang may face significant tsunamis causing the maximum tsunami inundation height and depth of 15 and 10 m, respectively. A comprehensive tsunami evacuation plan - including horizontal evacuation area maps, assessment of temporary shelters considering the impact due to ground shaking and tsunami, and integrated horizontal-vertical evacuation time maps - has been developed based on the stochastic tsunami simulation results. The developed evacuation plans highlight that comprehensive mitigation policies can be produced from the stochastic tsunami simulation for future tsunamigenic events.

  12. PLAN-TA9-2443(U), Rev. B Remediated Nitrate Salt (RNS) Surrogate Formulation and Testing Standard Procedure

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Brown, Geoffrey Wayne

    2016-03-16

    This document identifies scope and some general procedural steps for performing Remediated Nitrate Salt (RNS) Surrogate Formulation and Testing. This Test Plan describes the requirements, responsibilities, and process for preparing and testing a range of chemical surrogates intended to mimic the energetic response of waste created during processing of legacy nitrate salts. The surrogates developed are expected to bound1 the thermal and mechanical sensitivity of such waste, allowing for the development of process parameters required to minimize the risk to worker and public when processing this waste. Such parameters will be based on the worst-case kinetic parameters as derived frommore » APTAC measurements as well as the development of controls to mitigate sensitivities that may exist due to friction, impact, and spark. This Test Plan will define the scope and technical approach for activities that implement Quality Assurance requirements relevant to formulation and testing.« less

  13. 43 CFR 10005.15 - Planning and management techniques applicable to the plan.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... applicable to the plan. 10005.15 Section 10005.15 Public Lands: Interior Regulations Relating to Public Lands... AND IMPLEMENTING THE COMMISSION'S MITIGATION AND CONSERVATION PLAN § 10005.15 Planning and management techniques applicable to the plan. The Commission recognizes that there are a wide range of techniques that...

  14. Improving Empirical Approaches to Estimating Local Greenhouse Gas Emissions

    NASA Astrophysics Data System (ADS)

    Blackhurst, M.; Azevedo, I. L.; Lattanzi, A.

    2016-12-01

    Evidence increasingly indicates our changing climate will have significant global impacts on public health, economies, and ecosystems. As a result, local governments have become increasingly interested in climate change mitigation. In the U.S., cities and counties representing nearly 15% of the domestic population plan to reduce 300 million metric tons of greenhouse gases over the next 40 years (or approximately 1 ton per capita). Local governments estimate greenhouse gas emissions to establish greenhouse gas mitigation goals and select supporting mitigation measures. However, current practices produce greenhouse gas estimates - also known as a "greenhouse gas inventory " - of empirical quality often insufficient for robust mitigation decision making. Namely, current mitigation planning uses sporadic, annual, and deterministic estimates disaggregated by broad end use sector, obscuring sources of emissions uncertainty, variability, and exogeneity that influence mitigation opportunities. As part of AGU's Thriving Earth Exchange, Ari Lattanzi of City of Pittsburgh, PA recently partnered with Dr. Inez Lima Azevedo (Carnegie Mellon University) and Dr. Michael Blackhurst (University of Pittsburgh) to improve the empirical approach to characterizing Pittsburgh's greenhouse gas emissions. The project will produce first-order estimates of the underlying sources of uncertainty, variability, and exogeneity influencing Pittsburgh's greenhouse gases and discuss implications of mitigation decision making. The results of the project will enable local governments to collect more robust greenhouse gas inventories to better support their mitigation goals and improve measurement and verification efforts.

  15. Selecting land-based mitigation practices to reduce GHG emissions from the rural land use sector: a case study of North East Scotland.

    PubMed

    Feliciano, Diana; Hunter, Colin; Slee, Bill; Smith, Pete

    2013-05-15

    The Climate Change (Scotland) Act 2009 commits Scotland to reduce GHG emissions by at least 42% by 2020 and 80% by 2050, from 1990 levels. According to the Climate Change Delivery Plan, the desired emission reduction for the rural land use sector (agriculture and other land uses) is 21% compared to 1990, or 10% compared to 2006 levels. In 2006, in North East Scotland, gross greenhouse gas (GHG) emissions from rural land uses were about 1599 ktCO2e. Thus, to achieve a 10% reduction in 2020 relative to 2006, emissions would have to decrease to about 1440 ktCO2e. This study developed a methodology to help selecting land-based practices to mitigate GHG emissions at the regional level. The main criterion used was the "full" mitigation potential of each practice. A mix of methods was used to undertake this study, namely a literature review and quantitative estimates. The mitigation practice that offered greatest "full" mitigation potential (≈66% reduction by 2020 relative to 2006) was woodland planting with Sitka spruce. Several barriers, such as economic, social, political and institutional, affect the uptake of mitigation practices in the region. Consequently the achieved mitigation potential of a practice may be lower than its "full" mitigation potential. Surveys and focus groups, with relevant stakeholders, need to be undertaken to assess the real area where mitigation practices can be implemented and the best way to overcome the barriers for their implementation. Copyright © 2013 Elsevier Ltd. All rights reserved.

  16. Development of a Windbreak Dust Predictive Model and Mitigation Planning Tool

    DTIC Science & Technology

    2013-12-01

    laminar and turbulent flow (Uo = 5 m/s and Ls = 1 cm). Figure 28 Deposition fraction, DF, as a function of Stk * showing the collapse of the artificial...Figure 30 Deposition fraction, DF, as a function of the modified Stokes number ( Stk *). Figure 31 The measured decrease in horizontal PM10 flux, F...concentration. Sb Particle travel distance vi SERDP Strategic Environmental Research and Development Program Stk Stokes number Stk * Modified Stokes

  17. Blueprint for the development of low carbon society scenarios for Asian regions- case study of Iskandar Malaysia

    NASA Astrophysics Data System (ADS)

    Ho, C. S.; Matsuoka, Y.; Chau, L. W.; Teh, B. T.; Simson, J. J.; Gomi, K.

    2013-06-01

    Malaysian government aims to reduce 40% reduction of carbon emission intensity by the year 2020 using 2005 as the base year. Several mitigation and adaptation strategies in addressing environmental and climate change are formulated at national, regional and local level to mitigate greenhouse gases. This paper aims to examine local and regional resilient policy actions to reduce greenhouse gases using the empirical case of Iskandar Malaysia. The study case is selected because it is one of the fast developing economic corridor regions in Malaysia. In this study, a low carbon society blueprint is initiated to guide the rapid development of this economic corridor towards low carbon green growth. The blueprint provides the sustainable green growth roadmap with major 12 actions for the region. It is done through a bottom-up approach where stakeholder discussions are carried out to allow local communities participation in the plan formulation.

  18. Assessment of human thermal comfort and mitigation measures in different urban climatotopes

    NASA Astrophysics Data System (ADS)

    Müller, N.; Kuttler, W.

    2012-04-01

    This study analyses thermal comfort in the model city of Oberhausen as an example for the densely populated metropolitan region Ruhr, Germany. As thermal loads increase due to climate change negative impacts especially for city dwellers will arise. Therefore mitigation strategies should be developed and considered in urban planning today to prevent future thermal stress. The method consists of the combination of in-situ measurements and numerical model simulations. So in a first step the actual thermal situation is determined and then possible mitigation strategies are derived. A measuring network was installed in eight climatotopes for a one year period recording air temperature, relative humidity, wind speed and wind direction. Based on these parameters the human thermal comfort in terms of physiological equivalent temperature (PET) was calculated by RayMan Pro software. Thus the human comfort of different climatotopes was determined. Heat stress in different land uses varies, so excess thermal loads in urban areas could be detected. Based on the measuring results mitigation strategies were developed, such as increasing areas with high evaporation capacity (green areas and water bodies). These strategies were implemented as different plan scenarios in the microscale urban climate model ENVI-met. The best measure should be identified by comparing the range and effect of these scenarios. Simulations were run in three of the eight climatotopes (city center, suburban and open land site) to analyse the effectiveness of the mitigation strategies in several land use structures. These cover the range of values of all eight climatotopes and therefore provide representative results. In the model area of 21 ha total, the modified section in the different plan scenarios was 1 ha. Thus the effect of small-scale changes could be analysed. Such areas can arise due to population decline and structural changes and hold conversion potential. Emphasis was also laid on analysing the effectiveness of water bodies, which need further research in contrast to well analysed vegetation areas. Results show different thermal loads in the miscellaneous climatotopes due to land use structures. Both measurements and model simulations demonstrate the positive effect on thermal comfort due to augmentation of areas with high evaporation capacity. These effects can be especially well detected in summer, when heat stress is most pronounced. The measurement based PET calculations show a maximum difference of 4 K PET between inner city and open land site in summer nights. Simulation results overall present a PET reduction of 1-3 K. The average PET reduction in the city center site is about 2 K, while the maximum reduction in the suburban site can exceed 5 K. In urban areas parks are particularly advisable as mitigation measure, because they reduce thermal stress both by tree shading and evapotranspiration.

  19. Global typology of urban energy use and potentials for an urbanization mitigation wedge

    PubMed Central

    Creutzig, Felix; Baiocchi, Giovanni; Bierkandt, Robert; Pichler, Peter-Paul; Seto, Karen C.

    2015-01-01

    The aggregate potential for urban mitigation of global climate change is insufficiently understood. Our analysis, using a dataset of 274 cities representing all city sizes and regions worldwide, demonstrates that economic activity, transport costs, geographic factors, and urban form explain 37% of urban direct energy use and 88% of urban transport energy use. If current trends in urban expansion continue, urban energy use will increase more than threefold, from 240 EJ in 2005 to 730 EJ in 2050. Our model shows that urban planning and transport policies can limit the future increase in urban energy use to 540 EJ in 2050 and contribute to mitigating climate change. However, effective policies for reducing urban greenhouse gas emissions differ with city type. The results show that, for affluent and mature cities, higher gasoline prices combined with compact urban form can result in savings in both residential and transport energy use. In contrast, for developing-country cities with emerging or nascent infrastructures, compact urban form, and transport planning can encourage higher population densities and subsequently avoid lock-in of high carbon emission patterns for travel. The results underscore a significant potential urbanization wedge for reducing energy use in rapidly urbanizing Asia, Africa, and the Middle East. PMID:25583508

  20. A Mitigation Process for Impacts of the All American Pipeline on Oak Woodlands in Santa Barbara County

    Treesearch

    Germaine Reyes-French; Timothy J. Cohen

    1991-01-01

    This paper outlines a mitigation program for pipeline construction impacts to oak tree habitat by describing the requirements for the Offsite Oak Mitigation Program for the All American Pipeline (AAPL) in Santa Barbara County, California. After describing the initial environmental analysis, the County regulatory structure is described under which the plan was required...

  1. SPADER - Science Planning Analysis and Data Estimation Resource for the NASA Parker Solar Probe Mission

    NASA Astrophysics Data System (ADS)

    Rodgers, D. J.; Fox, N. J.; Kusterer, M. B.; Turner, F. S.; Woleslagle, A. B.

    2017-12-01

    Scheduled to launch in July 2018, the Parker Solar Probe (PSP) will orbit the Sun for seven years, making a total of twenty-four extended encounters inside a solar radial distance of 0.25 AU. During most orbits, there are extended periods of time where PSP-Sun-Earth geometry dramatically reduces PSP-Earth communications via the Deep Space Network (DSN); there is the possibility that multiple orbits will have little to no high-rate downlink available. Science and housekeeping data taken during an encounter may reside on the spacecraft solid state recorder (SSR) for multiple orbits, potentially running the risk of overflowing the SSR in the absence of mitigation. The Science Planning Analysis and Data Estimation Resource (SPADER) has been developed to provide the science and operations teams the ability to plan operations accounting for multiple orbits in order to mitigate the effects caused by the lack of high-rate downlink. Capabilities and visualizations of SPADER are presented; further complications associated with file downlink priority and high-speed data transfers between instrument SSRs and the spacecraft SSR are discussed, as well as the long-term consequences of variations in DSN downlink parameters on the science data downlink.

  2. Reducing environmental noise impacts: A USAREUR noise management program handbook

    NASA Astrophysics Data System (ADS)

    Feather, Timothy D.; Shekell, Ted K.

    1991-06-01

    Noise pollution is a major environmental problem faced by the U.S. Army in Europe. Noise-related complaints from German citizens can escalate into intense political issues in German communities. This in turn hampers efficient operation of military training and often times threatens the Army's mission. In order to remedy these problems, USAREUR has developed a noise management program. A successful noise management program will limit the impact of unavoidable noise on the populace. This report, a component of the noise management program, is a reference document for noise management planning. It contains guidelines and rules-of-thumb for noise management. This document contains procedures which operation and training level personnel can understand and apply in their day to day noise management planning. Noise mitigation tips are given. Basic technical information that will aid in understanding noise mitigation is provided along with noise management through land use planning. Noise management for specific components of the military community, (airfields, base operations, training areas, and housing and recreation areas) are addressed. The nature of noise generated, means of noise abatement at the source, path, and receiver (both physical and organizational/public relations methods), and a case study example are described.

  3. Is wetland mitigation successful in Southern California?

    NASA Astrophysics Data System (ADS)

    Cummings, D. L.; Rademacher, L. K.

    2004-12-01

    Wetlands perform many vital functions within their landscape position; they provide unique habitats for a variety of flora and fauna and they act as treatment systems for upstream natural and anthropogenic waste. California has lost an estimated 91% of its wetlands. Despite the 1989 "No Net Loss" policy and mitigation requirements by the regulatory agencies, the implemented mitigation may not be offsetting wetlands losses. The "No Net Loss" policy is likely failing for numerous reasons related to processes in the wetlands themselves and the policies governing their recovery. Of particular interest is whether these mitigation sites are performing essential wetlands functions. Specific questions include: 1) Are hydric soil conditions forming in mitigation sites; and, 2) are the water quality-related chemical transformations that occur in natural wetlands observed in mitigation sites. This study focuses on success (or lack of success) in wetlands mitigation sites in Southern California. Soil and water quality investigations were conducted in wetland mitigation sites deemed to be successful by vegetation standards. Observations of the Standard National Resource Conservation Service field indicators of reducing conditions were made to determine whether hydric soil conditions have developed in the five or more years since the implementation of mitigation plans. In addition, water quality measurements were performed at the inlet and outlet of these mitigation sites to determine whether these sites perform similar water quality transformations to natural wetlands within the same ecosystem. Water quality measurements included nutrient, trace metal, and carbon species measurements. A wetland location with minimal anthropogenic changes and similar hydrologic and vegetative features was used as a control site. All sites selected for study are within a similar ecosystem, in the interior San Diego and western Riverside Counties, in Southern California.

  4. A dataset mapping the potential biophysical effects of vegetation cover change

    NASA Astrophysics Data System (ADS)

    Duveiller, Gregory; Hooker, Josh; Cescatti, Alessandro

    2018-02-01

    Changing the vegetation cover of the Earth has impacts on the biophysical properties of the surface and ultimately on the local climate. Depending on the specific type of vegetation change and on the background climate, the resulting competing biophysical processes can have a net warming or cooling effect, which can further vary both spatially and seasonally. Due to uncertain climate impacts and the lack of robust observations, biophysical effects are not yet considered in land-based climate policies. Here we present a dataset based on satellite remote sensing observations that provides the potential changes i) of the full surface energy balance, ii) at global scale, and iii) for multiple vegetation transitions, as would now be required for the comprehensive evaluation of land based mitigation plans. We anticipate that this dataset will provide valuable information to benchmark Earth system models, to assess future scenarios of land cover change and to develop the monitoring, reporting and verification guidelines required for the implementation of mitigation plans that account for biophysical land processes.

  5. A dataset mapping the potential biophysical effects of vegetation cover change

    PubMed Central

    Duveiller, Gregory; Hooker, Josh; Cescatti, Alessandro

    2018-01-01

    Changing the vegetation cover of the Earth has impacts on the biophysical properties of the surface and ultimately on the local climate. Depending on the specific type of vegetation change and on the background climate, the resulting competing biophysical processes can have a net warming or cooling effect, which can further vary both spatially and seasonally. Due to uncertain climate impacts and the lack of robust observations, biophysical effects are not yet considered in land-based climate policies. Here we present a dataset based on satellite remote sensing observations that provides the potential changes i) of the full surface energy balance, ii) at global scale, and iii) for multiple vegetation transitions, as would now be required for the comprehensive evaluation of land based mitigation plans. We anticipate that this dataset will provide valuable information to benchmark Earth system models, to assess future scenarios of land cover change and to develop the monitoring, reporting and verification guidelines required for the implementation of mitigation plans that account for biophysical land processes. PMID:29461538

  6. Landslides! Engaging students in natural hazards and STEM principles through the exploration of landslide analog models

    NASA Astrophysics Data System (ADS)

    Gochis, E. E.; Lechner, H. N.; Brill, K. A.; Lerner, G.; Ramos, E.

    2014-12-01

    Graduate students at Michigan Technological University developed the "Landslides!" activity to engage middle & high school students participating in summer engineering programs in a hands-on exploration of geologic engineering and STEM (Science, Technology, Engineering and Math) principles. The inquiry-based lesson plan is aligned to Next Generation Science Standards and is appropriate for 6th-12th grade classrooms. During the activity students focus on the factors contributing to landslide development and engineering practices used to mitigate hazards of slope stability hazards. Students begin by comparing different soil types and by developing predictions of how sediment type may contribute to differences in slope stability. Working in groups, students then build tabletop hill-slope models from the various materials in order to engage in evidence-based reasoning and test their predictions by adding groundwater until each group's modeled slope fails. Lastly students elaborate on their understanding of landslides by designing 'engineering solutions' to mitigate the hazards observed in each model. Post-evaluations from students demonstrate that they enjoyed the hands-on nature of the activity and the application of engineering principles to mitigate a modeled natural hazard.

  7. A Study of the Impact of Peak Demand on Increasing Vulnerability of Cascading Failures to Extreme Contingency Events

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Vyakaranam, Bharat GNVSR; Vallem, Mallikarjuna R.; Nguyen, Tony B.

    The vulnerability of large power systems to cascading failures and major blackouts has become evident since the Northeast blackout in 1965. Based on analyses of the series of cascading blackouts in the past decade, the research community realized the urgent need to develop better methods, tools, and practices for performing cascading-outage analysis and for evaluating mitigations that are easily accessible by utility planning engineers. PNNL has developed the Dynamic Contingency Analysis Tool (DCAT) as an open-platform and publicly available methodology to help develop applications that aim to improve the capabilities of power planning engineers to assess the impact and likelihoodmore » of extreme contingencies and potential cascading events across their systems and interconnections. DCAT analysis will help identify potential vulnerabilities and allow study of mitigation solutions to reduce the risk of cascading outages in technically sound and effective ways. Using the DCAT capability, we examined the impacts of various load conditions to identify situations in which the power grid may encounter cascading outages that could lead to potential blackouts. This paper describes the usefulness of the DCAT tool and how it helps to understand potential impacts of load demand on cascading failures on the power system.« less

  8. Idaho Habitat and Natural Production Monitoring Part I, 1993 Annual Report.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Rich, Bruce A.; Petrosky, Charles E.

    The Idaho Department of Fish and Game (IDFG) has been monitoring and evaluating proposed and existing habitat improvement projects for rainbow-steelhead trout Oncorhynchus mykiss and chinook salmon O. tshawytscha in the Clearwater River and Salmon River drainages on a large scale for the past 8 years. Projects included in the evaluation are funded by, or proposed for funding by, the Bonneville Power Administration (BPA) under the Northwest Power Planning Act as off-site mitigation for downstream hydropower development on the Snake and Columbia rivers. A mitigation record is being developed using increased carrying capacity and/or survival as the best measures ofmore » benefit from a habitat enhancement project. Determination of full benefit from a project depends on completion or maturation of the project and presence of adequate numbers of fish to document actual increases in fish production. The depressed status of upriver anadromous stocks has precluded measuring full benefits of any habitat project in Idaho. Partial benefit is credited to the mitigation record in the interim period of run restoration.« less

  9. 76 FR 68745 - Notice of Intent To Update the Upland Erosion Control and Revegetation and Maintenance Plan and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-07

    ... Waterbody Construction and Mitigation Procedures and Request for Comments The staff of the Office of Energy...) and Wetland and Waterbody Construction and Mitigation Procedures (Procedures), dated January 17, 2003...

  10. Standard guide for developing a cost-effective risk mitigation plan for new and existing constructed facilities

    Treesearch

    Jeffrey Prestemon

    2011-01-01

    Protecting constructed facilities from damages from natural and man-made hazards in a costeffective manner is a challenging task. Several measures of economic performance are available for evaluating building-related investments. These measures include, but are not limited to, life-cycle cost, present value net savings, savings-to-investment ratio, and adjusted...

  11. Localizing Climate Information for Municipal Planning in the Central U.S.

    NASA Astrophysics Data System (ADS)

    Shulski, M.; Umphlett, N.; Abdel-Monem, T.; Tang, Z.; Uhlarik, F.

    2017-12-01

    The impacts of projected climate change are an ongoing concern for municipalities. Planning at the local level often involves investigations of multiple hazards on decadal timescales. Of particular interest to cities are implications of too much or too little water, snow storms, heat waves, and freeze/thaw cycles on infrastructure, health, energy demands and water quality and availability. A two-year project led by the University of Nebraska - Lincoln has brought together scientist and stakeholder for the purpose of informing municipal planning and climate adaptation for 12 cities in the lower Missouri River Basin states (IA, NE, KS, MO). City-specific climate reports have been developed with municipal input to aid local planning efforts. Surveys to assess municipal climate data usage were distributed to all cities with a population greater than 5,000 in the four-state region. In addition, planning efforts for 18 municipalities have been evaluated for nearly 20 cities in the region to investigate local hazard mitigation, emergency, and comprehensive plans. This presentation will outline key outcomes of the project and discuss decision support tools developed in co-production with city planners.

  12. An examination of land use impacts of flooding induced by sea level rise

    NASA Astrophysics Data System (ADS)

    Song, Jie; Fu, Xinyu; Gu, Yue; Deng, Yujun; Peng, Zhong-Ren

    2017-03-01

    Coastal regions become unprecedentedly vulnerable to coastal hazards that are associated with sea level rise. The purpose of this paper is therefore to simulate prospective urban exposure to changing sea levels. This article first applied the cellular-automaton-based SLEUTH model (Project Gigalopolis, 2016) to calibrate historical urban dynamics in Bay County, Florida (USA) - a region that is greatly threatened by rising sea levels. This paper estimated five urban growth parameters by multiple-calibration procedures that used different Monte Carlo iterations to account for modeling uncertainties. It then employed the calibrated model to predict three scenarios of urban growth up to 2080 - historical trend, urban sprawl, and compact development. We also assessed land use impacts of four policies: no regulations; flood mitigation plans based on the whole study region and on those areas that are prone to experience growth; and the protection of conservational lands. This study lastly overlaid projected urban areas in 2030 and 2080 with 500-year flooding maps that were developed under 0, 0.2, and 0.9 m sea level rise. The calibration results that a substantial number of built-up regions extend from established coastal settlements. The predictions suggest that total flooded area of new urbanized regions in 2080 would be more than 25 times that under the flood mitigation policy, if the urbanization progresses with few policy interventions. The joint model generates new knowledge in the domain between land use modeling and sea level rise. It contributes to coastal spatial planning by helping develop hazard mitigation schemes and can be employed in other international communities that face combined pressure of urban growth and climate change.

  13. Trial by fire: Community Wildfire Protection Plans put to the test

    Treesearch

    Pamela J. Jakes; Victoria Sturtevant

    2013-01-01

    Research has found that community wildfire protection planning can make significant contributions to wildfire mitigation and preparedness, but can the planning process and resulting Community Wildfire Protection Plans make a difference to wildfire response and recovery? In case studies conducted in four USA communities with Community Wildfire Protection Plans in place...

  14. Lease of Parcel ED-1 of the Oak Ridge Reservation by the East Tennessee Economic Council

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1996-04-01

    The US Department of Energy (DOE) has completed an environmental assessment (DOE/EA-1113) for the proposed lease of 957.16 acres of the Oak Ridge Reservation (ORR) to the East Tennessee Economic Council (ETEC), a non-profit community organization, for a period of 10 years, with an option for renewal. ETEC proposes to develop an industrial park on the leased site to provide employment opportunities for DOE and contractor employees affected by decreased federal funding. Based on the results of the analysis reported in the EA and implementation of mitigation measures defined in this Finding of No Significant Impact (FONSI), DOE has determinedmore » that the proposed action is not a major Federal action that would significantly affect the quality of the human environment within the context of the National Environmental Policy Act of 1969 (NEPA). Therefore, preparation of an environmental impact statement (EIS) is not necessary, and DOE is issuing this mitigated FONSI. DOE will implement a Mitigation Action Plan for this project and provide annual reports on mitigation and monitoring.« less

  15. Effective Mitigation and Adaptation Strategies for Public Health Impacts of Heatwaves for Brookline, MA

    NASA Astrophysics Data System (ADS)

    Jalalzadeh Fard, B.; Hassanzadeh, H.; Bhatia, U.; Ganguly, A. R.

    2016-12-01

    Studies on urban areas show a significant increase in frequency and intensity of heatwaves over the past decades, and predict the same trend for future. Since heatwaves have been responsible for a large number of life losses, urgent adaptation and mitigation strategies are required in the policy and decision making level for a sustainable urban planning. The Sustainability and Data Sciences Laboratory at Northeastern University, under the aegis of Thriving Earth Exchange of AGU, is working with the town of Brookline to understand the potential public health impacts of anticipated heatwaves. We consider the most important social and physical factors to obtain vulnerability and exposure parameters for each census block group of the town. Utilizing remote sensing data, we locate Urban Heat Islands (UHIs) during a recent heatwave event, as the hazard parameter. We then create priority risk map using the risk framework. Our analyses show spatial correlations between the UHIs and social factors such as poverty, and physical factors such as land cover variations. Furthermore, we investigate the future heatwave frequency and intensity increases by analyzing the climate models predictions. For future changes of UHIs, land cover changes are investigated using available predictive data. Also, socioeconomic predictions are carried out to complete the futuristic models of heatwave risks. Considering plausible scenarios for Brookline, we develop different risk maps based on the vulnerability, exposure and hazard parameters. Eventually, we suggest guidelines for Heatwave Action Plans for prioritizing effective mitigation and adaptation strategies in urban planning for the town of Brookline.

  16. Managing for Successful Control of Naturally Occurring Asbestos During Large Scale Grading

    NASA Astrophysics Data System (ADS)

    Saur, R.; Harnish, D.; Cavanaugh, J.; Kendall, K.; Virdee, A.; Ludlam, D.

    2012-12-01

    Pacific Gas and Electric Company recently completed environmental remediation and civil grading of a 35-acre site in San Francisco Bay Area, and the project became recognized with local agencies as having excellent controls systems for naturally-occurring asbestos (NOA). The project began in 2010 and was completed in 2012, and involved excavating and grading over 100,000 tons of soil containing NOA. The work was subject to requirements by state, local and regional agencies, including an asbestos dust mitigation plan for the Bay Area Air Quality Management District. Effective control of NOA is attributed to management approaches combined with effective monitoring and state-of-the-art controls. Management Planning. The contract for construction specified NOA compliance management and controls, including having a NOA-control "czar" ultimately responsible for effective mitigation. An important element was daily pre-planning for excavation/grading that involved both the NOA mitigation experts and construction staff. Personnel Planning and Training. All construction personnel were trained before work regarding NOA hazards and mitigations. Daily tailboards with all construction personnel included discussions of the NOA controls integral to the daily work. Supervision. A NOA mitigation compliance leader was assigned to each excavation operation, responsible for continuously monitoring wind direction and work to ensure mitigation met requirements, and that disturbed areas were hydrosealed or covered. Adaptive Management - Daily and weekly debriefs occurred with those responsible for NOA controls to evaluate effectiveness, and identify improvements needed. If a monitoring result exceeded the project trigger level, work shut down and a root-cause analysis was performed to determine appropriate corrective actions. Deviations of results from background were researched as to cause, and any adjustments identified. Nearby non-project activities were monitored, as they occasionally caused trigger level exceedences in perimeter monitors, including from off-site vehicles, nearby construction, and mechanical vegetation management (e.g. weed whacking). Regulatory and Owner Oversight. Monitoring results were reported daily to agencies, agencies made frequent inspections, and owner's independent compliance representatives observed the NOA mitigation and provided real-time feedback to the construction team. NOA Controls. NOA emissions were controlled site-wide and for each work activity. Site systems included misting, water trucks on roads, temporary covers and soil sealants. Work activity controls for excavation/grading included both source and perimeter controls. Water application technologies specially designed for NOA fiber mitigation, and not just dust mitigation, were effective without adding excessive water to work areas. These activities collectively created a management structure that facilitated successful implementation of NOA control technologies.

  17. Sharing international experiences in disasters: summary and action plan.

    PubMed

    Andrews, R A; Austin, C; Brown, R; Chen, Y Z; Engindeniz, Z; Girouard, R; Leaman, P; Masellis, M; Nakayama, S; Polentsov, Y O; Suserud, B O

    2001-01-01

    The discussions in this theme provided an opportunity to share specific experiences with disasters that occurred outside of the Asia-Pacific Rim. Details of the methods used are provided in the preceding paper. The chairs moderated all presentations and produced a summary that was presented to an assembly of all of the delegates. Since the findings from the Theme 7 and Theme 3 groups were similar, the chairs of both groups presided over one workshop that resulted in the generation of a set of action plans that then were reported to the collective group of all delegates. The main points developed during the presentations and discussion included: (1) disaster response planning, (2) predetermined command and organizational structure, (3) rapid response capability, (4) mitigation, and (5) communications and alternatives. The action plans presented are in common with those presented by Theme 3, and include: (1) plan disaster responses including the different types, identification of hazards, training based on experiences, and provision of public education; (2) improving coordination and control; (3) maintaining communications assuming infrastructure breakdown; (4) maximizing mitigation through standardized evaluations, creation of a legal framework, and recognition of advocacy and public participation; and (5) providing resources and knowledge through access to existing therapies, using the media, and increasing decentralization of hospital inventories. Most of the problems that occurred outside the Asia-Pacific rim relative to disaster management are similar to those experienced within it. They should be addressed in common with the rest of the world.

  18. Planning for Crew Exercise for Deep Space Mission Scenarios

    NASA Technical Reports Server (NTRS)

    Moore, E. Cherice; Ryder, Jeff

    2015-01-01

    Exercise which is necessary for maintaining crew health on-orbit and preparing the crew for return to 1G can be challenging to incorporate into spaceflight vehicles. Deep space missions will require further understanding of the physiological response to microgravity, understanding appropriate mitigations, and designing the exercise systems to effectively provide mitigations, and integrating effectively into vehicle design with a focus to support planned mission scenarios. Recognizing and addressing the constraints and challenges can facilitate improved vehicle design and exercise system incorporation.

  19. 44 CFR 201.2 - Definitions.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... SECURITY DISASTER ASSISTANCE MITIGATION PLANNING § 201.2 Definitions. Administrator means the head of the Federal Emergency Management Agency, or his/her designated representative. Flood Mitigation Assistance (FMA) means the program authorized by section 1366 of the National Flood Insurance Act of 1968, as...

  20. 44 CFR 201.2 - Definitions.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... SECURITY DISASTER ASSISTANCE MITIGATION PLANNING § 201.2 Definitions. Administrator means the head of the Federal Emergency Management Agency, or his/her designated representative. Flood Mitigation Assistance (FMA) means the program authorized by section 1366 of the National Flood Insurance Act of 1968, as...

  1. 44 CFR 201.2 - Definitions.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... SECURITY DISASTER ASSISTANCE MITIGATION PLANNING § 201.2 Definitions. Administrator means the head of the Federal Emergency Management Agency, or his/her designated representative. Flood Mitigation Assistance (FMA) means the program authorized by section 1366 of the National Flood Insurance Act of 1968, as...

  2. 44 CFR 201.2 - Definitions.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... SECURITY DISASTER ASSISTANCE MITIGATION PLANNING § 201.2 Definitions. Administrator means the head of the Federal Emergency Management Agency, or his/her designated representative. Flood Mitigation Assistance (FMA) means the program authorized by section 1366 of the National Flood Insurance Act of 1968, as...

  3. 44 CFR 201.2 - Definitions.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... SECURITY DISASTER ASSISTANCE MITIGATION PLANNING § 201.2 Definitions. Administrator means the head of the Federal Emergency Management Agency, or his/her designated representative. Flood Mitigation Assistance (FMA) means the program authorized by section 1366 of the National Flood Insurance Act of 1968, as...

  4. Quantifying Access Disparities in Response Plans

    PubMed Central

    Indrakanti, Saratchandra; Mikler, Armin R.; O’Neill, Martin; Tiwari, Chetan

    2016-01-01

    Effective response planning and preparedness are critical to the health and well-being of communities in the face of biological emergencies. Response plans involving mass prophylaxis may seem feasible when considering the choice of dispensing points within a region, overall population density, and estimated traffic demands. However, the plan may fail to serve particular vulnerable subpopulations, resulting in access disparities during emergency response. For a response plan to be effective, sufficient mitigation resources must be made accessible to target populations within short, federally-mandated time frames. A major challenge in response plan design is to establish a balance between the allocation of available resources and the provision of equal access to PODs for all individuals in a given geographic region. Limitations on the availability, granularity, and currency of data to identify vulnerable populations further complicate the planning process. To address these challenges and limitations, data driven methods to quantify vulnerabilities in the context of response plans have been developed and are explored in this article. PMID:26771551

  5. 75 FR 54026 - Salvage and Marine Firefighting Requirements; Vessel Response Plans for Oil

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-03

    ... and Marine Firefighting Requirements; Vessel Response Plans for Oil AGENCY: Coast Guard, DHS. ACTION... vessel response plan salvage and marine firefighting requirements for tank vessels carrying oil. The... establish evidence that they have properly planned to mitigate oil outflow and to provide that information...

  6. A Comprehensive Approach to Emergency Planning

    ERIC Educational Resources Information Center

    Worsley, Tracy L.; Beckering, Don

    2007-01-01

    It is essential that the traditional emergency management structure be used as a framework for higher education emergency planning. The four phases of emergency management should be reflected in the architecture of all planning efforts. These include "preparedness," "response," "mitigation," and "recovery."…

  7. Lessons Learned In Developing Multiple Distributed Planning Systems for the International Space Station

    NASA Technical Reports Server (NTRS)

    Maxwell, Theresa G.; McNair, Ann R. (Technical Monitor)

    2002-01-01

    The planning processes for the International Space Station (ISS) Program are quite complex. Detailed mission planning for ISS on-orbit operations is a distributed function. Pieces of the on-orbit plan are developed by multiple planning organizations, located around the world, based on their respective expertise and responsibilities. The "pieces" are then integrated to yield the final detailed plan that will be executed onboard the ISS. Previous space programs have not distributed the planning and scheduling functions to this extent. Major ISS planning organizations are currently located in the United States (at both the NASA Johnson Space Center (JSC) and NASA Marshall Space Flight Center (MSFC)), in Russia, in Europe, and in Japan. Software systems have been developed by each of these planning organizations to support their assigned planning and scheduling functions. Although there is some cooperative development and sharing of key software components, each planning system has been tailored to meet the unique requirements and operational environment of the facility in which it operates. However, all the systems must operate in a coordinated fashion in order to effectively and efficiently produce a single integrated plan of ISS operations, in accordance with the established planning processes. This paper addresses lessons learned during the development of these multiple distributed planning systems, from the perspective of the developer of one of the software systems. The lessons focus on the coordination required to allow the multiple systems to operate together, rather than on the problems associated with the development of any particular system. Included in the paper is a discussion of typical problems faced during the development and coordination process, such as incompatible development schedules, difficulties in defining system interfaces, technical coordination and funding for shared tools, continually evolving planning concepts/requirements, programmatic and budget issues, and external influences. Techniques that mitigated some of these problems will also be addressed, along with recommendations for any future programs involving the development of multiple planning and scheduling systems. Many of these lessons learned are not unique to the area of planning and scheduling systems, so may be applied to other distributed ground systems that must operate in concert to successfully support space mission operations.

  8. Lessons Learned in Developing Multiple Distributed Planning Systems for the International Space Station

    NASA Technical Reports Server (NTRS)

    Maxwell, Theresa G.

    2002-01-01

    The planning processes for the International Space Station (ISS) Program are quite complex. Detailed mission planning for ISS on-orbit operations is a distributed function. Pieces of the on-orbit plan are developed by multiple planning organizations, located around the world, based on their respective expertise and responsibilities. The pieces are then integrated to yield the final detailed plan that will be executed onboard the ISS. Previous space programs have not distributed the planning and scheduling functions to this extent. Major ISS planning organizations are currently located in the United States (at both the NASA Johnson Space Center (JSC) and NASA Marshall Space Flight Center (MSFC)), in Russia, in Europe, and in Japan. Software systems have been developed by each of these planning organizations to support their assigned planning and scheduling functions. Although there is some cooperative development and sharing of key software components, each planning system has been tailored to meet the unique requirements and operational environment of the facility in which it operates. However, all the systems must operate in a coordinated fashion in order to effectively and efficiently produce a single integrated plan of ISS operations, in accordance with the established planning processes. This paper addresses lessons learned during the development of these multiple distributed planning systems, from the perspective of the developer of one of the software systems. The lessons focus on the coordination required to allow the multiple systems to operate together, rather than on the problems associated with the development of any particular system. Included in the paper is a discussion of typical problems faced during the development and coordination process, such as incompatible development schedules, difficulties in defining system interfaces, technical coordination and funding for shared tools, continually evolving planning concepts/requirements, programmatic and budget issues, and external influences. Techniques that mitigated some of these problems will also be addressed, along with recommendations for any future programs involving the development of multiple planning and scheduling systems. Many of these lessons learned are not unique to the area of planning and scheduling systems, so may be applied to other distributed ground systems that must operate in concert to successfully support space mission operations.

  9. The U.S. National Tsunami Hazard Mitigation Program: Successes in Tsunami Preparedness

    NASA Astrophysics Data System (ADS)

    Whitmore, P.; Wilson, R. I.

    2012-12-01

    Formed in 1995 by Congressional Action, the National Tsunami Hazards Mitigation Program (NTHMP) provides the framework for tsunami preparedness activities in the United States. The Program consists of the 28 U.S. coastal states, territories, and commonwealths (STCs), as well as three Federal agencies: the National Oceanic and Atmospheric Administration (NOAA), the Federal Emergency Management Agency (FEMA), and the United States Geological Survey (USGS). Since its inception, the NTHMP has advanced tsunami preparedness in the United States through accomplishments in many areas of tsunami preparedness: - Coordination and funding of tsunami hazard analysis and preparedness activities in STCs; - Development and execution of a coordinated plan to address education and outreach activities (materials, signage, and guides) within its membership; - Lead the effort to assist communities in meeting National Weather Service (NWS) TsunamiReady guidelines through development of evacuation maps and other planning activities; - Determination of tsunami hazard zones in most highly threatened coastal communities throughout the country by detailed tsunami inundation studies; - Development of a benchmarking procedure for numerical tsunami models to ensure models used in the inundation studies meet consistent, NOAA standards; - Creation of a national tsunami exercise framework to test tsunami warning system response; - Funding community tsunami warning dissemination and reception systems such as sirens and NOAA Weather Radios; and, - Providing guidance to NOAA's Tsunami Warning Centers regarding warning dissemination and content. NTHMP activities have advanced the state of preparedness of United States coastal communities, and have helped save lives and property during recent tsunamis. Program successes as well as future plans, including maritime preparedness, are discussed.

  10. Study of the Cherokee Nuclear Station: projected impacts, monitoring plan, and mitigation options for Cherokee County, South Carolina

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Peelle, E.; Schweitzer, M.; Scharre, P.

    1979-07-01

    This report inventories Cherokee County's capabilities and CNS project characteristics, projects expected impacts from the interaction of the two defines four options for Cherokee County decision makers, and presents a range of possible mitigation and monitoring plans for dealing with the problems identified. The four options and general implementation guidelines for each are presented after reviewing pertinent features of other mitigation and monitoring plans. The four options include (1) no action, (2) preventing impacts by preventing growth, (3) selective growth in designated areas as services can be supplied, and (4) maximum growth designed to attract as many in-movers as possiblemore » through a major program of capital investiments in public and private services. With the exception of the no action option, all plans deal with impacts according to some strategy determined by how the County wishes to manage growth. Solutions for impact problems depend on which growth strategy is selected and what additional resources are secured during the impact period. A monitoring program deals with the problems of data and projections uncertainty, while direct action is proposed to deal with the institutional problems of delay of the needed access road, timeing and location problems from the tax base mismatch, and lack of local planning capability.« less

  11. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Petrosky, Charles E.; Holubetz, Terry B.

    The Idaho Department of Fish and Game has been monitoring and evaluating existing and proposed habitat improvement projects for steelhead (Salmo gairdneri) and chinook salmon (Oncorhynchus tshawytscha) in the Clearwater and Salmon River drainages over the last four years. Projects included in the evaluation are funded by, or proposed for funding by, the Bonneville Power Administration (BPA) under the Northwest Power Planning Act as off-site mitigation for downstream hydropower development on the Snake and Columbia rivers. A mitigation record is being developed to use increased smolt production at full seeding as the best measure of benefit from a habitat enhancementmore » project. Determination of full benefit from a project depends on presence of adequate numbers of fish to document actual increases in fish production. The depressed nature of upriver anadromous stocks have precluded attainment of full benefit of any habitat project in Idaho. Partial benefit will be credited to the mitigation record in the interim period of run restoration. According to the BPA Work Plan, project implementors have the primary responsibility for measuring physical habitat and estimating habitat change. To date, Idaho habitat projects have been implemented primarily by the US Forest Service (USFS). The Shoshone-Bannock Tribes (SBT) have sponsored three projects (Bear Valley Mine, Yankee Fork, and the proposed East Fork Salmon River projects). IDFG implemented two barrier-removal projects (Johnson Creek and Boulder Creek) that the USFS was unable to sponsor at that time. The role of IDFG in physical habitat monitoring is primarily to link habitat quality and habitat change to changes in actual, or potential, fish production. Individual papers were processed separately for the data base.« less

  12. Optimization of protocol design: a path to efficient, lower cost clinical trial execution

    PubMed Central

    Malikova, Marina A

    2016-01-01

    Managing clinical trials requires strategic planning and efficient execution. In order to achieve a timely delivery of important clinical trials’ outcomes, it is useful to establish standardized trial management guidelines and develop robust scoring methodology for evaluation of study protocol complexity. This review will explore the challenges clinical teams face in developing protocols to ensure that the right patients are enrolled and the right data are collected to demonstrate that a drug is safe and efficacious, while managing study costs and study complexity based on proposed comprehensive scoring model. Key factors to consider when developing protocols and techniques to minimize complexity will be discussed. A methodology to identify processes at planning phase, approaches to increase fiscal return and mitigate fiscal compliance risk for clinical trials will be addressed. PMID:28031939

  13. Orbit Transfer Rocket Engine Technology Program: Advanced engine study, task D.1/D.3

    NASA Technical Reports Server (NTRS)

    Martinez, A.; Erickson, C.; Hines, B.

    1986-01-01

    Concepts for space maintainability of OTV engines were examined. An engine design was developed which was driven by space maintenance requirements and by a failure mode and effects (FME) analysis. Modularity within the engine was shown to offer cost benefits and improved space maintenance capabilities. Space operable disconnects were conceptualized for both engine change-out and for module replacement. Through FME mitigation the modules were conceptualized to contain the least reliable and most often replaced engine components. A preliminary space maintenance plan was developed around a controls and condition monitoring system using advanced sensors, controls, and condition monitoring concepts. A complete engine layout was prepared satisfying current vehicle requirements and utilizing projected component advanced technologies. A technology plan for developing the required technology was assembled.

  14. 0-6762 : maximizing mitigation benefits-making a difference with strategic inter-resource agency planning.

    DOT National Transportation Integrated Search

    2014-08-01

    Transportation agencies do their best to avoid : and minimize any impacts to the environment, : but some impacts are unavoidable. : Compensatory mitigation is used to offset these : unavoidable impacts to the environment. Over : $3.3 billion is spent...

  15. L-325 Sagebrush Habitat Mitigation Project: FY2008 Compensation Area Monitoring Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Durham, Robin E.; Sackschewsky, Michael R.

    2008-09-30

    This document provides a review and status of activities conducted in support of the Fluor Daniel Hanford Company (Fluor) Mitigation Action Plan (MAP) for Project L-325, Electrical Utility Upgrades. It includes time-zero monitoring results for planting activities conducted in January 2008, annual survival monitoring for all planting years (2007 and 2008), and recommendations for the successful completion of DOE habitat mitigation commitments for this project.

  16. Succession planning for technical experts

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kirk, Bernadette Lugue; Cain, Ronald A.; Dewji, Shaheen A.

    This report describes a methodology for identifying, evaluating, and mitigating the loss of key technical skills at nuclear operations facilities. The methodology can be adapted for application within regulatory authorities and research and development organizations, and can be directly applied by international engagement partners of the Department of Energy’s National Nuclear Security Administration (NNSA). The resultant product will be of direct benefit to two types of NNSA missions: (1) domestic human capital development programs tasked to provide focused technical expertise to succeed an aging nuclear operations workforce, and (2) international safeguards programs charged with maintaining operational safeguards for developing/existing nuclearmore » power program in nations where minimal available resources must be used effectively. This report considers succession planning and the critical skills necessary to meet an institution’s goals and mission. Closely tied to succession planning are knowledge management and mentorship. In considering succession planning, critical skill sets are identified and are greatly dependent on the subject matter expert in question. This report also provides examples of critical skills that are job specific.« less

  17. Critical success factors in infrastructure projects

    NASA Astrophysics Data System (ADS)

    Zakaria, Siti Fairus; Zin, Rosli Mohamad; Mohamad, Ismail; Balubaid, Saeed; Mydin, Shaik Hussein; Mohd Rahim, E. M. Roodienyanto

    2017-11-01

    Construction of infrastructure project is different from buildings. The main difference is term of project site where infrastructure project need to command a long stretch while building mostly confine to a limited area. As such factors that are critical to infrastructure project may not be that significant to building project and vice versa. Flood mitigation can be classified under infrastructure projects under which their developments are planned by the government with the specific objective to reduce or avoid the negative effects of flood to the environment and livelihood. One of the indicators in project success is delay. The impact of project delay in construction industry is significant that it decelerates the projects implementation, specifically the government projects. This study attempted to identify and compare the success factors between infrastructure and building projects, as such comparison rarely found in the current literature. A model of flood mitigation projects' success factors was developed by merging the experts' views and reports from the existing literature. The experts' views were obtained from the responses to open-ended questions on the required fundamentals to achieve successful completion of flood mitigation projects. An affinity analysis was applied to these responses to develop the model. The developed model was then compared to the established success factors found in building project, extracted from the previous studies to identify the similarities and differences between the two models. This study would assist the government and construction players to become more effective in constructing successful flood mitigation projects for the future practice in a flood-prone country like Malaysia.

  18. 44 CFR 201.7 - Tribal Mitigation Plans.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... buildings, infrastructure, and critical facilities located in the identified hazard areas; (B) An estimate... particular emphasis on new and existing buildings and infrastructure. (iii) An action plan describing how the...

  19. Decision-support systems for natural-hazards and land-management issues

    USGS Publications Warehouse

    Dinitz, Laura; Forney, William; Byrd, Kristin

    2012-01-01

    Scientists at the USGS Western Geographic Science Center are developing decision-support systems (DSSs) for natural-hazards and land-management issues. DSSs are interactive computer-based tools that use data and models to help identify and solve problems. These systems can provide crucial support to policymakers, planners, and communities for making better decisions about long-term natural hazards mitigation and land-use planning.

  20. Projecting water yield and ecosystem productivity across the United States by linking an ecohydrological model to WRF dynamically downscaled climate data

    Treesearch

    Shanlei Sun; Ge Sun; Erika Cohen Mack; Steve McNulty; Peter V. Caldwell; Kai Duan; Yang Zhang

    2016-01-01

    Quantifying the potential impacts of climatechange on water yield and ecosystem productivity is essential to developing sound watershed restoration plans, andecosystem adaptation and mitigation strategies. This study links an ecohydrological model (Water Supply and StressIndex, WaSSI) with WRF (Weather Research and Forecasting Model) using dynamically downscaled...

  1. High value of ecological information for river connectivity restoration

    USGS Publications Warehouse

    Sethi, Suresh; O'Hanley, Jesse R.; Gerken, Jonathon; Ashline, Joshua; Bradley, Catherine

    2017-01-01

    ContextEfficient restoration of longitudinal river connectivity relies on barrier mitigation prioritization tools that incorporate stream network spatial structure to maximize ecological benefits given limited resources. Typically, ecological benefits of barrier mitigation are measured using proxies such as the amount of accessible riverine habitat.ObjectivesWe developed an optimization approach for barrier mitigation planning which directly incorporates the ecology of managed taxa, and applied it to an urbanizing salmon-bearing watershed in Alaska.MethodsA novel river connectivity metric that exploits information on the distribution and movement of managed taxon was embedded into a barrier prioritization framework to identify optimal mitigation actions given limited restoration budgets. The value of ecological information on managed taxa was estimated by comparing costs to achieve restoration targets across alternative barrier prioritization approaches.ResultsBarrier mitigation solutions informed by life history information outperformed those using only river connectivity proxies, demonstrating high value of ecological information for watershed restoration. In our study area, information on salmon ecology was typically valued at 0.8–1.2 M USD in costs savings to achieve a given benefit level relative to solutions derived only from stream network information, equating to 16–28% of the restoration budget.ConclusionsInvesting in ecological studies may achieve win–win outcomes of improved understanding of aquatic ecology and greater watershed restoration efficiency.

  2. Greening the Grid: Pathways to Integrate 175 Gigawatts of Renewable Energy into India's Electric Grid, Vol. II - Regional Study

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Cochran, Jaquelin M.; Palchak, Joseph D; McBennett, Brendan

    The higher-spatial-resolution model of 'Greening the Grid: Pathways to Integrate 175 Gigawatts of Renewable Energy into India's Electric Grid, Vol. II - Regional Study' (the Regional Study), which better represents the impact of congestion on least-cost scheduling and dispatch, provides a deeper understanding of the relationship among renewable energy (RE) location, transmission, and system flexibility with regard to RE integration, compared to 'Greening the Grid: Pathways to Integrate 175 Gigawatts of Renewable Energy into India's Electric Grid, Vol. I - National Study.' The Regional Study validates the relative value of mitigation strategies demonstrated in the National Study - namely, coordinatedmore » operations among states reduce production costs, and reducing coal minimum generation levels reduces RE curtailment. Significantly, the Regional Study also highlights a potential barrier to realizing the value of these mitigation strategies: when locations of RE development are planned independently of state-level transmission, intrastate congestion can result in undesirable levels of RE curtailment. Therefore a key objective of this study is to illustrate to state-level power system planners and operators, in particular, how a higher-resolution model, inclusive of intrastate granularity, can be used as a planning tool for two primary purposes: -To better anticipate, understand, and mitigate system constraints that could affect RE integration; and - To provide a modeling framework that can be used as part of future transmission studies and planning efforts. The Regional Study is not intended to predict precisely how RE will affect state-level operations. There is considerable uncertainty regarding the locations of the RE development, as well as how contract terms can affect access to the inherent physical flexibility of the system. But the scenarios analyzed identify the types of issues that can arise under various RE and transmission expansion pathways. The model developed for this study provides a rigorous framework for future work and can be updated with the characteristics of new capacity as more information on the future power system is known.« less

  3. Greening the Grid: Integrating 175 Gigawatts of Renewable Energy into India's Electric Grid - A Detailed Look at the Southern Region

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Cochran, Jaquelin M

    The higher-spatial-resolution model of 'Greening the Grid: Pathways to Integrate 175 Gigawatts of Renewable Energy into India's Electric Grid, Vol. II - Regional Study' (the Regional Study), which better represents the impact of congestion on least-cost scheduling and dispatch, provides a deeper understanding of the relationship among renewable energy (RE) location, transmission, and system flexibility with regard to RE integration, compared to 'Greening the Grid: Pathways to Integrate 175 Gigawatts of Renewable Energy into India's Electric Grid, Vol. I - National Study.' The Regional Study validates the relative value of mitigation strategies demonstrated in the National Study - namely, coordinatedmore » operations among states reduce production costs, and reducing coal minimum generation levels reduces RE curtailment. Significantly, the Regional Study also highlights a potential barrier to realizing the value of these mitigation strategies: when locations of RE development are planned independently of state-level transmission, intrastate congestion can result in undesirable levels of RE curtailment. Therefore a key objective of this study is to illustrate to state-level power system planners and operators, in particular, how a higher-resolution model, inclusive of intrastate granularity, can be used as a planning tool for two primary purposes: to better anticipate, understand, and mitigate system constraints that could affect RE integration; and to provide a modeling framework that can be used as part of future transmission studies and planning efforts. The Regional Study is not intended to predict precisely how RE will affect state-level operations. There is considerable uncertainty regarding the locations of the RE development, as well as how contract terms can affect access to the inherent physical flexibility of the system. But the scenarios analyzed identify the types of issues that can arise under various RE and transmission expansion pathways. The model developed for this study provides a rigorous framework for future work and can be updated with the characteristics of new capacity as more information on the future power system is known.« less

  4. Greening the Grid: Integrating 175 Gigawatts of Renewable Energy into India's Electric Grid - A Detailed Look at the Western Region

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Cochran, Jaquelin

    The higher-spatial-resolution model of 'Greening the Grid: Pathways to Integrate 175 Gigawatts of Renewable Energy into India's Electric Grid, Vol. II - Regional Study' (the Regional Study), which better represents the impact of congestion on least-cost scheduling and dispatch, provides a deeper understanding of the relationship among renewable energy (RE) location, transmission, and system flexibility with regard to RE integration, compared to 'Greening the Grid: Pathways to Integrate 175 Gigawatts of Renewable Energy into India's Electric Grid, Vol. I - National Study.' The Regional Study validates the relative value of mitigation strategies demonstrated in the National Study - namely, coordinatedmore » operations among states reduce production costs, and reducing coal minimum generation levels reduces RE curtailment. Significantly, the Regional Study also highlights a potential barrier to realizing the value of these mitigation strategies: when locations of RE development are planned independently of state-level transmission, intrastate congestion can result in undesirable levels of RE curtailment. Therefore a key objective of this study is to illustrate to state-level power system planners and operators, in particular, how a higher-resolution model, inclusive of intrastate granularity, can be used as a planning tool for two primary purposes: -To better anticipate, understand, and mitigate system constraints that could affect RE integration; and - To provide a modeling framework that can be used as part of future transmission studies and planning efforts. The Regional Study is not intended to predict precisely how RE will affect state-level operations. There is considerable uncertainty regarding the locations of the RE development, as well as how contract terms can affect access to the inherent physical flexibility of the system. But the scenarios analyzed identify the types of issues that can arise under various RE and transmission expansion pathways. The model developed for this study provides a rigorous framework for future work and can be updated with the characteristics of new capacity as more information on the future power system is known.« less

  5. How much do hazard mitigation plans cost? An analysis of federal grant data.

    PubMed

    Jackman, Andrea M; Beruvides, Mario G

    2013-01-01

    Under the Disaster Mitigation Act of 2000 and Federal Emergency Management Agency's subsequent Interim Final Rule, the requirement was placed on local governments to author and gain approval for a Hazard Mitigation Plan (HMP) for the areas under their jurisdiction. Low completion percentages for HMPs--less than one-third of eligible governments--were found by an analysis conducted 3 years after the final deadline for the aforementioned legislation took place. Follow-up studies showed little improvement at 5 and 8 years after the deadline. It was hypothesized that the cost of a HMP is a significant factor in determining whether or not a plan is completed. A study was conducted using Boolean Matrix Analysis methods to determine what, if any, characteristics of a certain community will most influence the cost of a HMP. The frequency of natural hazards experienced by the planning area, the number of jurisdictions participating in the HMEP, the population, and population density were found to significantly affect cost. These variables were used in a regression analysis to determine their predictive power for cost. It was found that along with two interaction terms, the variables explain approximately half the variation in HMP cost.

  6. Buildings: Mitigation Opportunities with a Focus on Health Implications

    EPA Science Inventory

    For Frank Princiotta’s book, Global Climate Change—The Technology Challenge Addressing building energy use is the critical first step in any strategic plan for mitigating climate change. Buildings have a direct impact on estimated global climate change due to their large carbon ...

  7. 23 CFR 777.9 - Mitigation of impacts.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... existing degraded or historic wetlands or natural habitats through restoration or enhancement on or off... or natural habitats on or off site. Restoration of wetlands is generally preferable to enhancement or... transportation planning processes. (d) Mitigation or restoration of historic impacts to wetlands and natural...

  8. 23 CFR 777.9 - Mitigation of impacts.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... existing degraded or historic wetlands or natural habitats through restoration or enhancement on or off... or natural habitats on or off site. Restoration of wetlands is generally preferable to enhancement or... transportation planning processes. (d) Mitigation or restoration of historic impacts to wetlands and natural...

  9. Safe teleradiology: information assurance as project planning methodology.

    PubMed

    Collmann, Jeff; Alaoui, Adil; Nguyen, Dan; Lindisch, David

    2005-01-01

    The Georgetown University Medical Center Department of Radiology used a tailored version of OCTAVE, a self-directed information security risk assessment method, to design a teleradiology system that complied with the regulation implementing the security provisions of the Health Insurance Portability and Accountability Act (HIPAA) of 1996. The system addressed threats to and vulnerabilities in the privacy and security of protected health information. By using OCTAVE, Georgetown identified the teleradiology program's critical assets, described threats to the assurance of those assets, developed and ran vulnerability scans of a system pilot, evaluated the consequences of security breaches, and developed a risk management plan to mitigate threats to program assets, thereby implementing good information assurance practices. This case study illustrates the basic point that prospective, comprehensive planning to protect the privacy and security of an information system strategically benefits program management as well as system security.

  10. Summer in the City - Assessing and Communicating the Richmond, VA Urban Heat Island to the Public and Policymakers

    NASA Astrophysics Data System (ADS)

    Hoffman, J. S.; Maurakis, E. G.; Shandas, V.

    2017-12-01

    The local impacts of global climate change are generally underestimated or misunderstood by the public and policymakers as far-off, future problems. However, differential and regional surface warming trends are exacerbated in urban areas due to the radiative properties of impervious surfaces like buildings and roads relative to natural landscapes. Decades of research illustrate that this unnatural radiative imbalance in the built environment gives rise to the well-studied urban heat island effect, whereby air temperatures in urban areas are several degrees warmer than in surrounding non-urbanized areas. In this way, the urban heat island effect presents a unique opportunity to highlight the human influence on Earth systems and at the same time mobilize local community-scale action to mitigate and become resilient to climate change impacts on tangible, experiential time scales. However, public stakeholders, city planners, and policymakers may view the urban heat island effect and its mitigation strategies through varying degrees of climatological, public health, and urban development knowledge and interest. This variation in stakeholder engagement highlights the need for individualized science communication strategies for each audience in order to maximize understanding of the scientific outcomes and tactics for mitigating the urban heat island effect. The City of Richmond, Virginia is currently developing a climate action plan as part of their greenhouse gas emission reduction initiative, RVAgreen 2050, and its recently announced "Richmond 300," a 20-year city development master plan. These initiatives provide the policy backdrop for a public and stakeholder education campaign centered on communicating urban heat island effects and resilience strategies. As such, the Science Museum of Virginia led the city's first urban heat island assessment using citizen science and leveraging a network of local university, non-profit, and city government stakeholders. Here, we will share our tactics for public- and policymaker-centered dissemination of urban heat island science, findings, and mitigation strategies using a variety of techniques including local news stations, 3D visualization technology, NOAA-funded museum media pieces, and policymaker/stakeholder engagement opportunities.

  11. Crew Communication as a Factor in Aviation Accidents

    NASA Technical Reports Server (NTRS)

    Goguen, J.; Linde, C.; Murphy, M.

    1986-01-01

    The crew communication process is analyzed. Planning and explanation are shown to be well-structured discourse types, described by formal rules. These formal rules are integrated with those describing the other most important discourse type within the cockpit: the command-and-control speech act chain. The latter is described as a sequence of speech acts for making requests (including orders and suggestions), for making reports, for supporting or challenging statements, and for acknowledging previous speech acts. Mitigation level, a linguistic indication of indirectness and tentativeness in speech, was an important variable in several hypotheses, i.e., the speech of subordinates is more mitigated than the speech of superiors, the speech of all crewmembers is less mitigated when they know that they are in either a problem or emergency situation, and mitigation is a factor in failures of crewmembers to initiate discussion of new topics or have suggestions ratified by the captain. Test results also show that planning and explanation are more frequently performed by captains, are done more during crew- recognized problems, and are done less during crew-recognized emergencies. The test results also indicated that planning and explanation are more frequently performed by captains than by other crewmembers, are done more during crew-recognized problems, and are done less during-recognized emergencies.

  12. 50 CFR 216.275 - Requirements for monitoring and reporting.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Navy shall complete an Integrated Comprehensive Monitoring Plan (ICMP) in 2009. This planning and adaptive management tool shall include: (1) A method for prioritizing monitoring projects that clearly... potentially modify subsequent monitoring and mitigation. (4) An adaptive management plan. (5) A method for...

  13. Modelling farm vulnerability to flooding: A step toward vulnerability mitigation policies appraisal

    NASA Astrophysics Data System (ADS)

    Brémond, P.; Abrami, G.; Blanc, C.; Grelot, F.

    2009-04-01

    Recent catastrophic flood events such as Elbe in 2002 or Rhône in 2003 have shown limits of flood management policies relying on dykes protection: worsening of flood impacts downstream, increased damage by dykes rupture. Those events, among others, contributes to radical changes on the philosophy of flood prevention, with the promotion of new orientations for mitigating flood exposition. Two new trends may have a significant impact on rural areas: floodplain restoration and vulnerability mitigation. The Rhône River program, which is an contract of objectives signed between French Government and local collectivites, is highly illustrative of these new trends and their impact on agricultural sector. In this program, it appears that areas to be concerned by floodplain restoration are agricultural ones, because their supposed vulnerability to flood is expected to be less important to urban areas. As a consequence, agricultural sector is particularly concerned by planned actions on mitigation of assets vulnerability, an important part of the program (financial support of European Union of 7.5 Million euros). Mitigation of agricultural assets vulnerability reveals particularly interesting for two following reasons. Firstly, it is a way to maintain agricultural activities in floodplains yet existing, without promoting flood protection. Secondly, in case of floodplain restoration, vulnerability mitigation is a way for local authorities to compensate over-flooding impacts. In practice, local authorities may financially support farmers for implementing measures to mitigate their farm vulnerability. On the Rhône River, an important work has already been done to identify farm vulnerability to flooding, and propose measures to mitigate it. More than 3 000 farms exposed to flood risk have been identified representing 88 690 ha of agricultural areas which is estimated to generate damage between 400 and 800 Million euros depending on the season of occurrence for a catastrophic flood. In the case of farm activities, vulnerability mitigation consists in implementing measures which can be: physical (equipment or electric power system elevation), organizational (emergency or recovery plan) or financial (insurance). These measures aim at decreasing the total damage incurred by farmers in case of flooding. For instance, if equipment is elevated, it will not suffer direct damage such as degradation. As a consequence, equipment will be available to continue production or recovery tasks, thus, avoiding indirect damage such as delays, indebtedness… The effects of these policies on farms, in particular vulnerability mitigation cannot be appraised using current methodologies mainly because they do not consider farm as a whole and focus on direct damage at the land plot scale (loss of yield). Moreover, since vulnerability mitigation policies are quite recent, few examples of implementation exist and no feedback experience can be processed. Meanwhile, decision makers and financial actors require more justification of the efficiency of public fund by economic appraisal of the projects. On the Rhône River, decision makers asked for an economic evaluation of the program of farm vulnerability mitigation they plan to implement. This implies to identify the effects of the measures to mitigate farm vulnerability, and to classify them by comparing their efficacy (avoided damage) and their cost of implementation. In this presentation, we propose and discuss a conceptual model of vulnerability at the farm scale. The modelling, in Unified Modelling Language, enabled to represent the ties between spatial, organizational and temporal dimensions, which are central to understanding of farm vulnerability and resilience to flooding. Through this modelling, we encompass three goals: To improve the comprehension of farm vulnerability and create a framework that allow discussion with experts of different disciplines as well as with local farmers; To identify data which are needed to implement the model and to collect them, specifically using the focus group method; Based on the conceptual model, to program a mathematical model which will be used to simulate damage (direct and indirect) on farm due to flood. This last objective should enable us to appraise policy to mitigate vulnerability which is planned to be implemented on Rhône River at the individual and regional scale. Finally, we discuss the possibility to use the UML modelling to develop a multi-agent system approach which could be interesting to take into account ties between farmers (solidarity, loan of equipment) or systemic effects due to the damage incurred by economic partners (loss of market share). Keywords vulnerability, UML modelling, farming systems, flood, mitigation policy, economic valuation

  14. Advances in 4D Treatment Planning for Scanned Particle Beam Therapy — Report of Dedicated Workshops

    PubMed Central

    Bert, Christoph; Graeff, Christian; Riboldi, Marco; Nill, Simeon; Baroni, Guido; Knopf, Antje-Christin

    2014-01-01

    We report on recent progress in the field of mobile tumor treatment with scanned particle beams, as discussed in the latest editions of the 4D treatment planning workshop. The workshop series started in 2009, with about 20 people from 4 research institutes involved, all actively working on particle therapy delivery and development. The first workshop resulted in a summary of recommendations for the treatment of mobile targets, along with a list of requirements to apply these guidelines clinically. The increased interest in the treatment of mobile tumors led to a continuously growing number of attendees: the 2012 edition counted more than 60 participants from 20 institutions and commercial vendors. The focus of research discussions among workshop participants progressively moved from 4D treatment planning to complete 4D treatments, aiming at effective and safe treatment delivery. Current research perspectives on 4D treatments include all critical aspects of time resolved delivery, such as in-room imaging, motion detection, beam application, and quality assurance techniques. This was motivated by the start of first clinical treatments of hepato cellular tumors with a scanned particle beam, relying on gating or abdominal compression for motion mitigation. Up to date research activities emphasize significant efforts in investigating advanced motion mitigation techniques, with a specific interest in the development of dedicated tools for experimental validation. Potential improvements will be made possible in the near future through 4D optimized treatment plans that require upgrades of the currently established therapy control systems for time resolved delivery. But since also these novel optimization techniques rely on the validity of the 4DCT, research focusing on alternative 4D imaging technique, such as MRI based 4DCT generation will continue. PMID:24354749

  15. IDF Sagebrush Habitat Mitigation Project: FY2008 Compensation Area Monitoring Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Durham, Robin E.; Sackschewsky, Michael R.

    This document provides a review and status of activities conducted in support of the CH2MHill Hanford Group (CHG) Compensatory Mitigation Implementation Plan (MIP) for the Integrated Disposal Facility (IDF). It includes time-zero monitoring results for planting activities conducted in December 2007, annual survival monitoring for all planting years, a summary of artificial burrow observations, and recommendations for the successful completion of DOE mitigation commitments for this project.

  16. Towards an integrated defense system for cyber security situation awareness experiment

    NASA Astrophysics Data System (ADS)

    Zhang, Hanlin; Wei, Sixiao; Ge, Linqiang; Shen, Dan; Yu, Wei; Blasch, Erik P.; Pham, Khanh D.; Chen, Genshe

    2015-05-01

    In this paper, an implemented defense system is demonstrated to carry out cyber security situation awareness. The developed system consists of distributed passive and active network sensors designed to effectively capture suspicious information associated with cyber threats, effective detection schemes to accurately distinguish attacks, and network actors to rapidly mitigate attacks. Based on the collected data from network sensors, image-based and signals-based detection schemes are implemented to detect attacks. To further mitigate attacks, deployed dynamic firewalls on hosts dynamically update detection information reported from the detection schemes and block attacks. The experimental results show the effectiveness of the proposed system. A future plan to design an effective defense system is also discussed based on system theory.

  17. A Dynamic Model for the Evaluation of Aircraft Engine Icing Detection and Control-Based Mitigation Strategies

    NASA Technical Reports Server (NTRS)

    Simon, Donald L.; Rinehart, Aidan W.; Jones, Scott M.

    2017-01-01

    Aircraft flying in regions of high ice crystal concentrations are susceptible to the buildup of ice within the compression system of their gas turbine engines. This ice buildup can restrict engine airflow and cause an uncommanded loss of thrust, also known as engine rollback, which poses a potential safety hazard. The aviation community is conducting research to understand this phenomena, and to identify avoidance and mitigation strategies to address the concern. To support this research, a dynamic turbofan engine model has been created to enable the development and evaluation of engine icing detection and control-based mitigation strategies. This model captures the dynamic engine response due to high ice water ingestion and the buildup of ice blockage in the engines low pressure compressor. It includes a fuel control system allowing engine closed-loop control effects during engine icing events to be emulated. The model also includes bleed air valve and horsepower extraction actuators that, when modulated, change overall engine operating performance. This system-level model has been developed and compared against test data acquired from an aircraft turbofan engine undergoing engine icing studies in an altitude test facility and also against outputs from the manufacturers customer deck. This paper will describe the model and show results of its dynamic response under open-loop and closed-loop control operating scenarios in the presence of ice blockage buildup compared against engine test cell data. Planned follow-on use of the model for the development and evaluation of icing detection and control-based mitigation strategies will also be discussed. The intent is to combine the model and control mitigation logic with an engine icing risk calculation tool capable of predicting the risk of engine icing based on current operating conditions. Upon detection of an operating region of risk for engine icing events, the control mitigation logic will seek to change the engines operating point to a region of lower risk through the modulation of available control actuators while maintaining the desired engine thrust output. Follow-on work will assess the feasibility and effectiveness of such control-based mitigation strategies.

  18. OEM Emergency Prevention and Mitigation Information

    EPA Pesticide Factsheets

    The Office of Emergency Management maintains information relevant to preventing emergencies before they occur, and/or mitigating the effects of emergency when they do occur. A principal element of this data asset is the information managed by the System for Risk Management Plans (SRMP), which compiles risk management plans submitted by facilities in accordance with the Clean Air Act, Section 112(r). Affected facilities are to develop risk management programs which will prevent and minimize consequences of accidental releases of certain hazardous chemicals that could harm public health and the environment.Another component of this data asset are the results generated by the Priority Assessment Model (PAM), which analyzes information concerning low-level chronic emissions from facilities and sets priorities (low, medium, high) for proactive controls on releases that do not necessarily pose imminent threats, but which may under adverse circumstances create unacceptable health or ecological risks.Also included are inspection records compiled by the Oil Inspection Program. Under the Clean Water Act Section 311, EPA regulates oil storage that meets a specific regulatory threshold. Facilities that store oil and meet the regulatory threshold need to prepare and implement a Spill Prevention, Control, and Countermeasures (SPCC) Plan which needs to be reviewed and approved by a professional engineer. Additionally, facilities with larger oil storage capacity may have to pre

  19. A guide to understanding and implementing risk evaluation and mitigation strategies in organ transplantation.

    PubMed

    Gabardi, Steven; Tichy, Eric M

    2013-03-01

    To review the components of the Congressional mandate for risk evaluation and mitigation strategies (REMS) managed by the Food and Drug Administration and assess their impact on health care providers practicing within the organ transplant arena. A non-date-limited search of MEDLINE and EMBASE (January 2007-June 2012) was conducted by using the following search terms: risk evaluation and mitigation strategies, REMS, and organ transplant, including a query of the individual organs. Information from the Federal Register and the Food and Drug Administration was also evaluated. REMS are strategies implemented to manage known or potential risks associated with medications and to ensure ongoing pharmacovigilance throughout the life of a pharmaceutical product. Elements of REMS programs may consist of 3 levels: a medication guide, communication plan, and elements to assure safe use. A medication guide is used to help prevent serious adverse events, aid in patients' decision making, and enhance medication adherence. Communication plans help educate health care providers and encourage adherence with REMS. The elements to assure safe use is a restrictive process implemented when it is deemed necessary to ensure safe access for patients to products with known serious risks. In transplant medicine, REMS currently exist for belatacept (medication guide and communication plan) and the mycophenolic acid derivatives (medication guide and elements to assure safe use). REMS are another step in the evolution of the development and marketing of pharmaceutical agents. Use of REMS in solid-organ transplant is becoming common. Transplant clinicians must provide required patient education and become involved with other aspects of REMS implementation to reduce the serious risks of pharmaceuticals and to improve patients' outcomes.

  20. Impact of Risk Perception on Risk Communication and Community Resilience Enhancement

    NASA Astrophysics Data System (ADS)

    Frazier, T. G.; Thompson, C. M.

    2014-12-01

    Past studies have demonstrated there is a relationship between risk perception, risk tolerance and mitigation planning. When people experience high-risk perception, their risk tolerance is typically lowered causing them to become more likely to support the implementation of mitigation policies including those that are either cost intensive or politically controversial. Understanding stakeholder risk perception could therefore provide information about the likelihood of implementation of various mitigation strategies. Varied risk communication methods are needed to accurately represent community risk so as to better inform decision-making. In response to this need, this research examines the effect of risk perception on community resilience through a case study of Fernan Lake, ID. Researchers conducted a survey of Fernan Lake residents to determine their risk perception of the impact of blue-green algae blooms on community resilience. Survey questions were developed based on traditional risk perception factors like vested interest, social trust, knowledge, possible benefits or losses, relevance to individual and potential for control. The results were used to determine residents' risk perception of the impact of blue green algae blooms on Socio-Ecological System resource availability and future development and growth potential. Focus groups were then conducted to validate the survey results. Research results demonstrate that residents are concerned about the impacts of blue-green algae blooms, but the level of interest in acting on those concerns and their willingness to consider more aggressive mitigation strategies varies across the study area. This research demonstrates the need for varied risk communication approaches, depending upon community mitigation goals.

  1. 44 CFR 201.4 - Standard State Mitigation Plans.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... reduce risks from natural hazards and serves as a guide for State decision makers as they commit resources to reducing the effects of natural hazards. (b) Planning process. An effective planning process is... risk assessments must characterize and analyze natural hazards and risks to provide a statewide...

  2. 50 CFR 216.175 - Requirements for monitoring and reporting.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... complete an Integrated Comprehensive Monitoring Plan (ICMP) in 2009. This planning and adaptive management... subsequent monitoring and mitigation. (4) An adaptive management plan. (5) A method for standardizing data... Report—The Navy shall submit a report annually on October 1 describing the implementation and results...

  3. Cascadia Earthquake and Tsunami Scenario for California's North Coast

    NASA Astrophysics Data System (ADS)

    Dengler, L.

    2006-12-01

    In 1995 the California Division of Mines and Geology (now the California Geological Survey) released a planning scenario for an earthquake on the southern portion of the Cascadia subduction zone (CSZ). This scenario was the 8th and last of the Earthquake Planning Scenarios published by CDMG. It was the largest magnitude CDMG scenario, an 8.4 earthquake rupturing the southern 200 km of the CSZ, and it was the only scenario to include tsunami impacts. This scenario event has not occurred in historic times and depicts impacts far more severe than any recent earthquake. The local tsunami hazard is new; there is no written record of significant local tsunami impact in the region. The north coast scenario received considerable attention in Humboldt and Del Norte Counties and contributed to a number of mitigation efforts. The Redwood Coast Tsunami Work Group (RCTWG), an organization of scientists, emergency managers, government agencies, and businesses from Humboldt, Mendocino, and Del Norte Counties, was formed in 1996 to assist local jurisdictions in understanding the implications of the scenario and to promote a coordinated, consistent mitigation program. The group has produced print and video materials and promoted response and evacuation planning. Since 1997 the RCTWG has sponsored an Earthquake Tsunami Education Room at county fairs featuring preparedness information, hands-on exhibits and regional tsunami hazard maps. Since the development of the TsunamiReady Program in 2001, the RCTWG facilitates community TsunamiReady certification. To assess the effectiveness of mitigation efforts, five telephone surveys between 1993 and 2001 were conducted by the Humboldt Earthquake Education Center. A sixth survey is planned for this fall. Each survey includes between 400 and 600 respondents. Over the nine year period covered by the surveys, the percent with houses secured to foundations has increased from 58 to 80 percent, respondents aware of a local tsunami hazard increased from 51 to 73 percent and knowing what the Cascadia subduction zone is from 16 to 42 percent. It is not surprising that the earlier surveys showed increases as several strong earthquakes occurred in the area between 1992 and 1995 and there was considerable media attention. But the 2001 survey, seven years after the last widely felt event, still shows significant increases in almost all preparedness indicators. The 1995 CDMG scenario was not the sole reason for the increased interest in earthquake and tsunami hazards in the area, but the scenario gave government recognition to an event that was previously only considered seriously in the scientific community and has acted as a catalyst for mitigation and planning efforts.

  4. Bangladesh arsenic mitigation programs: lessons from the past

    PubMed Central

    Milton, Abul Hasnat; Hore, Samar Kumar; Hossain, Mohammad Zahid; Rahman, Mahfuzar

    2012-01-01

    Ensuring access to safe drinking water by 2015 is a global commitment by the Millennium Development Goals (MDGs). In Bangladesh, significant achievements in providing safe water were made earlier by nationwide tubewell-installation programme. This achievement was overshadowed in 1993 by the presence of arsenic in underground water. A total of 6 million tubewells have been tested for arsenic since then, the results of which warranted immediate mitigation. Mitigation measures included tubewell testing and replacing; usage of deeper wells; surface water preservation and treatment; use of sanitary dug wells, river sand and pond sand filters; rainwater collection and storage; household-scale and large-scale arsenic filtrations; and rural pipeline water supply installation. Shallow tubewell installation was discouraged. Efforts have been made to increase people's awareness. This paper describes the lessons learned about mitigation efforts by the authors from experience of arsenic-related work. In spite of national mitigation plans and efforts, a few challenges still persist: inadequate coordination between stakeholders, differences in inter-sectoral attitudes, inadequate research to identify region-specific, suitable safe water options, poor quality of works by various implementing agencies, and inadequate dissemination of the knowledge and experiences to the people by those organizations. Issues such as long-time adaptation using ground water, poor surface water quality including bad smell and turbidity, and refusal to using neighbor's water have delayed mitigation measures so far. Region-specific mitigation water supply policy led by the health sector could be adopted with multisectoral involvement and responsibility. Large-scale piped water supply could be arranged through Public Private Partnerships (PPP) in new national approach. PMID:22558005

  5. Bangladesh arsenic mitigation programs: lessons from the past.

    PubMed

    Milton, Abul Hasnat; Hore, Samar Kumar; Hossain, Mohammad Zahid; Rahman, Mahfuzar

    2012-01-01

    Ensuring access to safe drinking water by 2015 is a global commitment by the Millennium Development Goals (MDGs). In Bangladesh, significant achievements in providing safe water were made earlier by nationwide tubewell-installation programme. This achievement was overshadowed in 1993 by the presence of arsenic in underground water. A total of 6 million tubewells have been tested for arsenic since then, the results of which warranted immediate mitigation. Mitigation measures included tubewell testing and replacing; usage of deeper wells; surface water preservation and treatment; use of sanitary dug wells, river sand and pond sand filters; rainwater collection and storage; household-scale and large-scale arsenic filtrations; and rural pipeline water supply installation. Shallow tubewell installation was discouraged. Efforts have been made to increase people's awareness. This paper describes the lessons learned about mitigation efforts by the authors from experience of arsenic-related work. In spite of national mitigation plans and efforts, a few challenges still persist: inadequate coordination between stakeholders, differences in inter-sectoral attitudes, inadequate research to identify region-specific, suitable safe water options, poor quality of works by various implementing agencies, and inadequate dissemination of the knowledge and experiences to the people by those organizations. Issues such as long-time adaptation using ground water, poor surface water quality including bad smell and turbidity, and refusal to using neighbor's water have delayed mitigation measures so far. Region-specific mitigation water supply policy led by the health sector could be adopted with multisectoral involvement and responsibility. Large-scale piped water supply could be arranged through Public Private Partnerships (PPP) in new national approach.

  6. Caregiver and Health Care Provider Perspectives on Cloud-Based Shared Care Plans for Children With Medical Complexity.

    PubMed

    Desai, Arti D; Jacob-Files, Elizabeth A; Wignall, Julia; Wang, Grace; Pratt, Wanda; Mangione-Smith, Rita; Britto, Maria T

    2018-06-05

    Shared care plans play an essential role in coordinating care across health care providers and settings for children with medical complexity (CMC). However, existing care plans often lack shared ownership, are out-of-date, and lack universal accessibility. In this study, we aimed to establish requirements for shared care plans to meet the information needs of caregivers and providers and to mitigate current information barriers when caring for CMC. We followed a user-centered design methodology and conducted in-depth semistructured interviews with caregivers and providers of CMC who receive care at a tertiary care children's hospital. We applied inductive, thematic analysis to identify salient themes. Analysis occurred concurrently with data collection; therefore, the interview guide was iteratively revised as new questions and themes emerged. Interviews were conducted with 17 caregivers and 22 providers. On the basis of participant perspectives, we identified 4 requirements for shared care plans that would help meet information needs and mitigate current information barriers when caring for CMC. These requirements included the following: (1) supporting the accessibility of care plans from multiple locations (eg, cloud-based) and from multiple devices, with alert and search features; (2) ensuring the organization is tailored to the specific user; (3) including collaborative functionality such as real-time, multiuser content management and secure messaging; and (4) storing care plans on a secure platform with caregiver-controlled permission settings. Although further studies are needed to understand the optimal design and implementation strategies, shared care plans that meet these specified requirements could mitigate perceived information barriers and improve care for CMC. Copyright © 2018 by the American Academy of Pediatrics.

  7. Building 'blue': An eco-engineering framework for foreshore developments.

    PubMed

    Mayer-Pinto, M; Johnston, E L; Bugnot, A B; Glasby, T M; Airoldi, L; Mitchell, A; Dafforn, K A

    2017-03-15

    Urbanisation in terrestrial systems has driven architects, planners, ecologists and engineers to collaborate on the design and creation of more sustainable structures. Examples include the development of 'green infrastructure' and the introduction of wildlife corridors that mitigate urban stressors and provide positive ecological outcomes. In contrast, efforts to minimise the impacts of urban developments in marine environments have been far more restricted in their extent and scope, and have often overlooked the ecological role of the built environment as potential habitat. Urban foreshore developments, i.e. those built on the interface of intertidal and/or subtidal zones, have the potential to incorporate clear multi-functional outcomes, by supporting novel ecosystems. We present a step-by-step eco-engineering framework for 'building blue' that will allow coastal managers to facilitate planning and construction of sustainable foreshore developments. Adopting such an approach will incorporate ecological principles, thereby mitigating some of the environmental impacts, creating more resilient urban infrastructure and environments, and maximising benefits to the multiple stakeholders and users of marine urban waterfronts. Copyright © 2016 Elsevier Ltd. All rights reserved.

  8. 40 CFR 230.98 - Mitigation banks and in-lieu fee programs.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... must be planned and designed to be self-sustaining over time, but some active management and... based approach, to the extent practicable, while still meeting the decision-making time frames specified... watershed approach to the extent practicable in reviewing proposed mitigation banks and in-lieu fee programs...

  9. 40 CFR 230.98 - Mitigation banks and in-lieu fee programs.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... must be planned and designed to be self-sustaining over time, but some active management and... based approach, to the extent practicable, while still meeting the decision-making time frames specified... watershed approach to the extent practicable in reviewing proposed mitigation banks and in-lieu fee programs...

  10. 40 CFR 230.98 - Mitigation banks and in-lieu fee programs.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... must be planned and designed to be self-sustaining over time, but some active management and... based approach, to the extent practicable, while still meeting the decision-making time frames specified... watershed approach to the extent practicable in reviewing proposed mitigation banks and in-lieu fee programs...

  11. 40 CFR 230.98 - Mitigation banks and in-lieu fee programs.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... must be planned and designed to be self-sustaining over time, but some active management and... based approach, to the extent practicable, while still meeting the decision-making time frames specified... watershed approach to the extent practicable in reviewing proposed mitigation banks and in-lieu fee programs...

  12. 40 CFR 230.98 - Mitigation banks and in-lieu fee programs.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... must be planned and designed to be self-sustaining over time, but some active management and... based approach, to the extent practicable, while still meeting the decision-making time frames specified... watershed approach to the extent practicable in reviewing proposed mitigation banks and in-lieu fee programs...

  13. Extending the life of asphalt pavements : part II Implementation plan: mitigation strategies & demonstration/pilot projects products P1 and P3.

    DOT National Transportation Integrated Search

    2011-01-01

    This report presents the mitigation strategies and demonstration/pilot projects that are recommended to enhance performance and reduce the occurrence of pavements exhibiting accelerated aging or deterioration. The report is grouped into two parts, fo...

  14. Modeling Techniques for Shipboard Manning: A Review and Plan for Development

    DTIC Science & Technology

    1993-02-01

    manning levels. Once manning models have been created, experiments can be conducted to show how changes in the manning structure might affect ship safety...these predictions, users of the manning models can evaluate how changes in crew configurations, manning levels, and voyage profiles affect ship safety...mitigate emergency situations would provide crucial information on how changes in manning structure would affect overall ship safety. Like emergency

  15. Combining Architecture-Centric Engineering with the Team Software Process

    DTIC Science & Technology

    2010-12-01

    colleagues from Quarksoft and CIMAT have re- cently reported on their experiences in “Introducing Software Architecture Development Methods into a TSP...Postmortem Lessons, new goals, new requirements, new risk , etc. Business and technical goals Estimates, plans, process, commitment Work products...architecture to mitigate the risks unco- vered by the ATAM. At the end of the iteration, version 1.0 of the architec- ture is available. Implement a second

  16. Predicting future US water yield and ecosystem productivity by linking an ecohydrological model to WRF dynamically downscaled climate projections

    Treesearch

    S. Sun; Ge Sun; Erika Cohen Mack; Steve McNulty; Peter Caldwell; K. Duan; Y. Zhang

    2015-01-01

    Quantifying the potential impacts of climate change on water yield and ecosystem productivity (i.e., carbon balances) is essential to developing sound watershed restoration plans, and climate change adaptation and mitigation strategies. This study links an ecohydrological model (Water Supply and Stress Index, WaSSI) with WRF (Weather Research and Forecasting Model)...

  17. Geo-hydrological risk management for civil protection purposes in the urban area of Genoa (Liguria, NW Italy)

    NASA Astrophysics Data System (ADS)

    Brandolini, P.; Cevasco, A.; Firpo, M.; Robbiano, A.; Sacchini, A.

    2012-04-01

    Over the past century the municipal area of Genoa has been affected by recurring flood events and several landslides that have caused severe damage to urbanized areas on both the coastal-fluvial plains and surrounding slopes, sometimes involving human casualties. The analysis of past events' annual distribution indicates that these phenomena have occurred with rising frequency in the last seventy years, following the main land use change due to the development of harbour, industrial, and residential areas, which has strongly impacted geomorphological processes. Consequently, in Genoa, civil protection activities are taking on an increasing importance for geo-hydrological risk mitigation. The current legislative framework assigns a key role in disaster prevention to municipalities, emergency plan development, as well as response action coordination in disaster situations. In view of the geomorphological and environmental complexity of the study area and referring to environmental laws, geo-hydrological risk mitigation strategies adopted by local administrators for civil protection purposes are presented as examples of current land/urban management related to geo-hydrological hazards. Adopted measures have proven to be effective on several levels (planning, management, structure, understanding, and publication) in different cases. Nevertheless, the last flooding event (4 November 2011) has shown that communication and public information concerning the perception of geo-hydrological hazard can be improved.

  18. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Vitale, Angelo; Roberts, Frank; Peters, Ronald

    Throughout the last century, the cumulative effects of anthropogenic disturbances have caused drastic watershed level landscape changes throughout the Reservation and surrounding areas (Coeur d'Alene Tribe 1998). Changes include stream channelization, wetland draining, forest and palouse prairie conversion for agricultural use, high road density, elimination of old growth timber stands, and denuding riparian communities. The significance of these changes is manifested in the degradation of habitats supporting native flora and fauna. Consequently, populations of native fish, wildlife, and plants, which the Tribe relies on as subsistence resources, have declined or in some instances been extirpated (Apperson et al. 1988; Coeurmore » d'Alene Tribe 1998; Lillengreen et al. 1996; Lillengreen et al. 1993; Gerry Green Coeur d'Alene Tribe wildlife Biologist, personal communication 2002). For example, bull trout (Salvelinus confluentus) are not present at detectable levels in Reservation tributaries, westslope cutthroat trout (Oncorhynchus clarki lewisi) are not present in numbers commensurate with maintaining harvestable fisheries (Lillengreen et al. 1993, 1996), and the Sharp-tailed grouse (Tympanuchus phasianellus) are not present at detectable levels on the Reservation (Gerry Green, Coeur d'Alene Tribe wildlife biologist, personal communication). The Coeur d'Alene Tribe added Fisheries and Wildlife Programs to their Natural Resources Department to address these losses and protect important cultural, and subsistence resources for future generations. The Tribal Council adopted by Resolution 89(94), the following mission statement for the Fisheries Program: 'restore, protect, expand and re-establish fish populations to sustainable levels to provide harvest opportunities'. This mission statement, focused on fisheries restoration and rehabilitation, is a response to native fish population declines throughout the Tribe's aboriginal territory, including the Coeur d'Alene Indian Reservation (Coeur d'Alene Tribe 1998). Implicit in this statement is a commitment to provide native subsistence resources in the present and near future as well as the long-term by employing all the mitigation and conservation measures available to them. The development of this Habitat Protection Plan is intended to provide additional planning level guidance as the implementation of conservation measures moves forward. The purpose of this plan is to develop a systematic approach to habitat restoration that will ultimately lead to self-perpetuating, harvestable populations of native fish, wildlife and botanical species. Specifically, it is our intention to apply the principles and analyses presented in this plan to prioritize future restoration efforts that receive funding under the Northwest Power Planning Council's Resident Fish and Wildlife Mitigation Programs. Using an ecosystem restoration approach based on landscape ecology concepts (Primack 1993), the basic premise of the plan is to (1) protect functioning habitat conditions and (2) restore degraded habitat conditions. This plan focuses on habitat conditions at the watershed scale (macrohabitat) rather than on the needs of single species and/or species guilds. By focusing restoration efforts at a macrohabitat level, restoration efforts target all native species inhabiting that area. This approach marks a paradigm shift that emphasizes ecological based restoration rather than species-specific restoration. Traditionally, fish managers and wildlife managers have approached restoration independently, often dedicating resources to a single species by focusing on specific habitat types on a small spatial scale (microhabitat) (Robinson and Bolen 1989, Marcot et al. 2002). This management technique has done little to curb declines despite large budgets (Pianka 1994). Restoration on a landscape level has shown promising results (Holling 1992) and many riparian and wetland restoration projects throughout the northwest have inadvertently improved habitats for non-targeted species. Landscape level restoration addresses the overall habitat condition of the regional area (macrohabitat), restoring the native species composition, density, and diversity by restoring the native ecosystem function. In the context of the development and implementation of this Habitat Protection Plan, it is important to understand that this is primarily a conservation tool, and is not intended to displace efforts that mitigate for lost resources. This plan is intended to primarily address long-term conservation needs and may not accommodate immediate short-term needs that address lost resources. Therefore, areas selected to address short-term mitigation needs may not be located in the high priority areas identified in this Plan. It needs to be clear that these projects and areas are no less important than those identified in this Plan.« less

  19. Modelling mitigation options to reduce diffuse nitrogen water pollution from agriculture.

    PubMed

    Bouraoui, Fayçal; Grizzetti, Bruna

    2014-01-15

    Agriculture is responsible for large scale water quality degradation and is estimated to contribute around 55% of the nitrogen entering the European Seas. The key policy instrument for protecting inland, transitional and coastal water resources is the Water Framework Directive (WFD). Reducing nutrient losses from agriculture is crucial to the successful implementation of the WFD. There are several mitigation measures that can be implemented to reduce nitrogen losses from agricultural areas to surface and ground waters. For the selection of appropriate measures, models are useful for quantifying the expected impacts and the associated costs. In this article we review some of the models used in Europe to assess the effectiveness of nitrogen mitigation measures, ranging from fertilizer management to the construction of riparian areas and wetlands. We highlight how the complexity of models is correlated with the type of scenarios that can be tested, with conceptual models mostly used to evaluate the impact of reduced fertilizer application, and the physically-based models used to evaluate the timing and location of mitigation options and the response times. We underline the importance of considering the lag time between the implementation of measures and effects on water quality. Models can be effective tools for targeting mitigation measures (identifying critical areas and timing), for evaluating their cost effectiveness, for taking into consideration pollution swapping and considering potential trade-offs in contrasting environmental objectives. Models are also useful for involving stakeholders during the development of catchments mitigation plans, increasing their acceptability. © 2013.

  20. Soil erosion and mitigation measures on rented and owned fields in Uruguay: the impact of transgenic soya and foreign investors

    NASA Astrophysics Data System (ADS)

    Caon, Lucrezia; Kessler, Aad; Keesstra, Saskia; Cruze, Rick

    2014-05-01

    Governments, companies and individuals with financial capital to invest, are worldwide buying or renting land in developing or third world countries. Uruguay is a developing country whose economy is mainly based on agriculture. Since 2000 many foreigners started to invest in the Uruguayan agricultural sector and to practice intensive large-scale agriculture. The significant presence of foreigners in the country is proven by the fact that almost 360 000 ha out of the 500 000 ha forming the study area were managed by foreigners in 2012. Nowadays farmers have abandoned the traditional crop rotation plan that included pasture to produce grain for export, and transgenic soya (soya RR) became the main crop planted by both foreigners and locals. Besides the high soil erosion rates related to having soya as main crop, planting soya implies the use of glyphosate, a broad-spectrum systemic herbicide leading to important environmental impacts. It is commonly said that foreigners investing in poor countries are exploiting the local natural resources aiming to get the highest possible profit from them. Is this a valid assumption in Uruguay? The purpose of this study was to compare the land management style of foreign and local farmers and to relate it to the soil erosion occurring in the study area. The land tenure (rented or owned fields) and the type of farmer interviewed ("individual farmer" equivalent to L.L.C. or "anonymous society" equivalent to P.L.C.) were taken into consideration during the analysis. Based on what stated by the farmers interviewed, the soil erosion simulations considered the seven most popular crop rotation plans on rented and owned fields, three ideals crop rotation plans, the application of no mitigation measures, and the construction of terraces and conservation buffers. Depending on the crop rotation plan, soils characterized by slope gradients higher than 2 resulted in soil erosion rates higher than the 7 ton/ha/year allowed by law. The highest soil erosion rates corresponded to crop rotation plans having high percentage of soybeans and low percentages of sorghum and/or maize. In addition, the soil erosion rate was even higher when only one crop, especially soybeans, was planted during an agricultural year. Although there were not significant differences in the land management style between foreign and local farmers, the land management style significantly differed between L.L.C. and P.L.C., and between owned and rented fields. Compared to L.L.C., P.L.C. applied more soil erosion mitigation measures on both rented and owned fields and invested in research. Owned fields resulted to be better managed than rented fields in which soil erosion mitigation measures were taken only in presence of an agreement with the landlord. Indeed, although the construction of terraces having a distance of 30-50 m significantly reduced the soil erosion rate, those were mainly built on owned fields.

  1. 40 CFR 300.210 - Federal contingency plans.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... contingency plans under the national response system: The National Contingency Plan, RCPs, and ACPs. These... discharge under § 300.324, and to mitigate or prevent a substantial threat of such a discharge, from a vessel, offshore facility, or onshore facility operating in or near the area. (2) The areas of...

  2. Crisis Planning: Survey Results from Hurricane Katrina and Implications for Performance Improvement Professionals

    ERIC Educational Resources Information Center

    Hutchins, Holly M.; Annulis, Heather; Gaudet, Cyndi

    2008-01-01

    Modern organizations constantly face unparalleled changes and uncertainty in the competitive world, thus requiring strategic planning to mitigate crisis conditions. Underscoring crisis plans are performance interventions that prepare employees, technological systems, and the organizational culture to effectively respond to a crisis event. However,…

  3. Risk management and disaster recovery planning for online libraries.

    PubMed

    Uzwyshyn, Ray

    2015-01-01

    This article presents an overview of risk management and disaster recovery planning for online libraries. It is suitable for a broad audience interested in online libraries and research centers in universities and colleges. It outlines risk mitigation strategies, and disaster recover planning for online resource-centered information systems.

  4. DOD Product Support Business Case Analysis Guidebook

    DTIC Science & Technology

    2011-04-01

    Mitigation Plans ................................................................................................ 30 4.8 Sensitivity Analysis...Product Support BCA concludes with a recommendation and associated specific actions and an implementation plan to achieve stated organizational...primary executer of the actions and recommendations derived out of the BCA. Within the program office, the PSM has the responsibility to plan

  5. Iowa Climate Change Adaptation and Resilience Report

    EPA Pesticide Factsheets

    The findings of a pilot project to work with stakeholders and governments in Iowa to identify barriers to and incentives for considering regional effects of climate change in hazard mitigation planning and other community planning processes.

  6. Cautious but committed: moving toward adaptive planning and operation strategies for renewable energy's wildlife implications.

    PubMed

    Köppel, Johann; Dahmen, Marie; Helfrich, Jennifer; Schuster, Eva; Bulling, Lea

    2014-10-01

    Wildlife planning for renewable energy must cope with the uncertainties of potential wildlife impacts. Unfortunately, the environmental policies which instigate renewable energy and those which protect wildlife are not coherently aligned-creating a green versus green dilemma. Thus, climate mitigation efforts trigger renewable energy development, but then face substantial barriers from biodiversity protection instruments and practices. This article briefly reviews wind energy and wildlife interactions, highlighting the lively debated effects on bats. Today, planning and siting of renewable energy are guided by the precautionary principle in an attempt to carefully address wildlife challenges. However, this planning attitude creates limitations as it struggles to negotiate the aforementioned green versus green dilemma. More adaptive planning and management strategies and practices hold the potential to reconcile these discrepancies to some degree. This adaptive approach is discussed using facets of case studies from policy, planning, siting, and operational stages of wind energy in Germany and the United States, with one case showing adaptive planning in action for solar energy as well. This article attempts to highlight the benefits of more adaptive approaches as well as the possible shortcomings, such as reduced planning security for renewable energy developers. In conclusion, these studies show that adaptive planning and operation strategies can be designed to supplement and enhance the precautionary principle in wildlife planning for green energy.

  7. Cautious but Committed: Moving Toward Adaptive Planning and Operation Strategies for Renewable Energy's Wildlife Implications

    NASA Astrophysics Data System (ADS)

    Köppel, Johann; Dahmen, Marie; Helfrich, Jennifer; Schuster, Eva; Bulling, Lea

    2014-10-01

    Wildlife planning for renewable energy must cope with the uncertainties of potential wildlife impacts. Unfortunately, the environmental policies which instigate renewable energy and those which protect wildlife are not coherently aligned—creating a green versus green dilemma. Thus, climate mitigation efforts trigger renewable energy development, but then face substantial barriers from biodiversity protection instruments and practices. This article briefly reviews wind energy and wildlife interactions, highlighting the lively debated effects on bats. Today, planning and siting of renewable energy are guided by the precautionary principle in an attempt to carefully address wildlife challenges. However, this planning attitude creates limitations as it struggles to negotiate the aforementioned green versus green dilemma. More adaptive planning and management strategies and practices hold the potential to reconcile these discrepancies to some degree. This adaptive approach is discussed using facets of case studies from policy, planning, siting, and operational stages of wind energy in Germany and the United States, with one case showing adaptive planning in action for solar energy as well. This article attempts to highlight the benefits of more adaptive approaches as well as the possible shortcomings, such as reduced planning security for renewable energy developers. In conclusion, these studies show that adaptive planning and operation strategies can be designed to supplement and enhance the precautionary principle in wildlife planning for green energy.

  8. The Leadville Mine Drainage Tunnel Catastrophe: A Case Study of How Isotope Geochemistry Provided Forensic Evidence to Inform Policy Decisions

    NASA Astrophysics Data System (ADS)

    Williams, M. W.; Wireman, M.; Liu, F.; Gertson, J.

    2008-12-01

    A state of emergency was declared in February 2008 because of fears that a blocked drainage tunnel in the Leadville mining district of Colorado could cause a catastrophic flood. An estimated 1 billion gallons of metals-laden water poses an eminent threat to the city of Leadville and the headwaters of the Arkansas river. Within days of the declaration of a state of emergency, Governor Ritter and Senator Salazer of Colorado, along with a host of other local and statewide politicians, visited the site and emphasized the need to develop a fast yet safe mitigation plan. Here we provide information from a case study that illustrates how a suite of isotopic and hydrologic tools enables identification of critical, site-specific variables essential in developing a science plan to guide targeted remediation of the Leadville drainage tunnel. The isotopic tools, including both stable and radiogenic isotopes, provided clear and compelling evidence of water sources and flowpaths in an area that has undergone extensive perturbations, including the drilling of more than 2,000 mine shafts. This forensic evidence was the key information in developing a plan to plug the drainage tunnel several hundred feet underground, divert a major source of polluted water from reaching the collapsed tunnel and piping it to an existing treatment plant, and guidance on where to place pumps in additional mine shafts, and the drilling of new wells to pump water in case the plugging of the tunnel caused water to pool up and raise the water table to dangerous heights. This particular case of forensic hydrology using isotopic tools not only provides the scientific basis for an operational plan to defuse a life- and property-threatening situation, it also provides the basis for decommissioning an existing water treatment plant, which will result in savings of over 1 million annually in operational costs. Decommissioning the existing water treatment plant will pay for the tunnel mitigation within several years.

  9. Planning for Desperate Climate Intervention: can it Make Sense?

    NASA Astrophysics Data System (ADS)

    Duncan, Robert

    2014-07-01

    The three National Academies of the United States, working together, authored a comprehensive report in 1992 titled: Policy Implications of Greenhouse Warming: Mitigation, Adaptation, and the Science Base. The authors discussed various possible methods of geoengineering to mitigate the adverse climate effects of the slow, steady buildup of greenhouse gasses in the Earth's atmosphere. Subsequently far less expensive, clever designs were developed by inventors such as Bill Gates and his collaborators, and these have been patented. Many of the techniques in this geoengineering proposition were commonly considered as methods of selectively polluting the upper atmosphere to block the solar luminosity, and hence they met with staunch resistance from the international scientific community. At the time, these geoengineering approaches were proposed as a method of countering the slow steady increase of the earth's temperature that was assumed to be a consequence of the increase in concentration of atmospheric molecules that contain carbon, such as CO2 and CH4. Such intentional intervention in a system as complex as the earth's atmosphere was considered by most scientists, including the authors, as reckless. Within this paper, we propose that the less expensive of these geoengineering plans be reconsidered, but that such a system never be deployed or tested at scale unless a genuine climate runaway condition arises in the future. The more economically compelling approaches should be further tested at the `lab bench' level, and in small laboratory-scale tests, and simulations. A comprehensive plan should be developed to manufacture the required materials at scale and to finalize the design of the necessary system, but no such deployment should be entered into at this time. The many risks of an intense, sudden release of greenhouse gasses, mainly methane and carbon dioxide from geologic sources, are reviewed briefly herein. We consider it only prudent to develop an economical and viable geoengineered plan to block part of the solar luminosity on the Earth, given the small but credible risk of a global climate runaway situation in the future.

  10. Resource-poor settings: response, recovery, and research: care of the critically ill and injured during pandemics and disasters: CHEST consensus statement.

    PubMed

    Geiling, James; Burkle, Frederick M; West, T Eoin; Uyeki, Timothy M; Amundson, Dennis; Dominguez-Cherit, Guillermo; Gomersall, Charles D; Lim, Matthew L; Luyckx, Valerie; Sarani, Babak; Christian, Michael D; Devereaux, Asha V; Dichter, Jeffrey R; Kissoon, Niranjan

    2014-10-01

    Planning for mass critical care in resource-poor and constrained settings has been largely ignored, despite large, densely crowded populations who are prone to suffer disproportionately from natural disasters. As a result, disaster response has been suboptimal and in many instances hampered by lack of planning, education and training, information, and communication. The Resource-Poor Settings panel developed five key question domains; defining the term resource poor and using the traditional phases of the disaster cycle (mitigation/preparedness/response/recovery). Literature searches were conducted to identify evidence to answer the key questions in these areas. Given a lack of data on which to develop evidence-based recommendations, expert-opinion suggestions were developed, and consensus was achieved using a modified Delphi process. The five key questions were as follows: definition, capacity building and mitigation, what resources can we bring to bear to assist/surge, response, and reconstitution and recovery of host nation critical care capabilities. Addressing these led the panel to offer 33 suggestions. Because of the large number of suggestions, the results have been separated into two sections: part I, Infrastructure/Capacity in the accompanying article, and part II, Response/Recovery/Research in this article. A lack of rudimentary ICU resources and capacity to enhance services plagues resource-poor or constrained settings. Capacity building therefore entails preventative strategies and strengthening of primary health services. Assistance from other countries and organizations is often needed to mount a surge response. Moreover, the disengagement of these responding groups and host country recovery require active planning. Future improvements in all phases require active research activities.

  11. Review of Antimicrobial Resistance in the Environment and Its Relevance to Environmental Regulators.

    PubMed

    Singer, Andrew C; Shaw, Helen; Rhodes, Vicki; Hart, Alwyn

    2016-01-01

    The environment is increasingly being recognized for the role it might play in the global spread of clinically relevant antibiotic resistance. Environmental regulators monitor and control many of the pathways responsible for the release of resistance-driving chemicals into the environment (e.g., antimicrobials, metals, and biocides). Hence, environmental regulators should be contributing significantly to the development of global and national antimicrobial resistance (AMR) action plans. It is argued that the lack of environment-facing mitigation actions included in existing AMR action plans is likely a function of our poor fundamental understanding of many of the key issues. Here, we aim to present the problem with AMR in the environment through the lens of an environmental regulator, using the Environment Agency (England's regulator) as an example from which parallels can be drawn globally. The issues that are pertinent to environmental regulators are drawn out to answer: What are the drivers and pathways of AMR? How do these relate to the normal work, powers and duties of environmental regulators? What are the knowledge gaps that hinder the delivery of environmental protection from AMR? We offer several thought experiments for how different mitigation strategies might proceed. We conclude that: (1) AMR Action Plans do not tackle all the potentially relevant pathways and drivers of AMR in the environment; and (2) AMR Action Plans are deficient partly because the science to inform policy is lacking and this needs to be addressed.

  12. Review of Antimicrobial Resistance in the Environment and Its Relevance to Environmental Regulators

    PubMed Central

    Singer, Andrew C.; Shaw, Helen; Rhodes, Vicki; Hart, Alwyn

    2016-01-01

    The environment is increasingly being recognized for the role it might play in the global spread of clinically relevant antibiotic resistance. Environmental regulators monitor and control many of the pathways responsible for the release of resistance-driving chemicals into the environment (e.g., antimicrobials, metals, and biocides). Hence, environmental regulators should be contributing significantly to the development of global and national antimicrobial resistance (AMR) action plans. It is argued that the lack of environment-facing mitigation actions included in existing AMR action plans is likely a function of our poor fundamental understanding of many of the key issues. Here, we aim to present the problem with AMR in the environment through the lens of an environmental regulator, using the Environment Agency (England’s regulator) as an example from which parallels can be drawn globally. The issues that are pertinent to environmental regulators are drawn out to answer: What are the drivers and pathways of AMR? How do these relate to the normal work, powers and duties of environmental regulators? What are the knowledge gaps that hinder the delivery of environmental protection from AMR? We offer several thought experiments for how different mitigation strategies might proceed. We conclude that: (1) AMR Action Plans do not tackle all the potentially relevant pathways and drivers of AMR in the environment; and (2) AMR Action Plans are deficient partly because the science to inform policy is lacking and this needs to be addressed. PMID:27847505

  13. Addressing Human System Risks to Future Space Exploration

    NASA Technical Reports Server (NTRS)

    Paloski, W. H.; Francisco, D. R.; Davis, J. R.

    2015-01-01

    NASA is contemplating future human exploration missions to destinations beyond low Earth orbit, including the Moon, deep-space asteroids, and Mars. While we have learned much about protecting crew health and performance during orbital space flight over the past half-century, the challenges of these future missions far exceed those within our current experience base. To ensure success in these missions, we have developed a Human System Risk Board (HSRB) to identify, quantify, and develop mitigation plans for the extraordinary risks associated with each potential mission scenario. The HSRB comprises research, technology, and operations experts in medicine, physiology, psychology, human factors, radiation, toxicology, microbiology, pharmacology, and food sciences. Methods: Owing to the wide range of potential mission characteristics, we first identified the hazards to human health and performance common to all exploration missions: altered gravity, isolation/confinement, increased radiation, distance from Earth, and hostile/closed environment. Each hazard leads to a set of risks to crew health and/or performance. For example the radiation hazard leads to risks of acute radiation syndrome, central nervous system dysfunction, soft tissue degeneration, and carcinogenesis. Some of these risks (e.g., acute radiation syndrome) could affect crew health or performance during the mission, while others (e.g., carcinogenesis) would more likely affect the crewmember well after the mission ends. We next defined a set of design reference missions (DRM) that would span the range of exploration missions currently under consideration. In addition to standard (6-month) and long-duration (1-year) missions in low Earth orbit (LEO), these DRM include deep space sortie missions of 1 month duration, lunar orbital and landing missions of 1 year duration, deep space journey and asteroid landing missions of 1 year duration, and Mars orbital and landing missions of 3 years duration. We then assessed the likelihood and consequences of each risk against each DRM, using three levels of likelihood (Low: less than or equal to 0.1%; Medium: 0.1%–1.0%; High: greater than or equal to 1.0%) and four levels of consequence ranging from Very Low (temporary or insignificant) to High (death, loss of mission, or significant reduction to length or quality of life). Quantitative evidence from clinical, operational, and research sources were used whenever available. Qualitative evidence was used when quantitative evidence was unavailable. Expert opinion was used whenever insufficient evidence was available. Results: A set of 30 risks emerged that will require further mitigation efforts before being accepted by the Agency. The likelihood by consequence risk assessment process provided a means of prioritizing among the risks identified. For each of the high priority risks, a plan was developed to perform research, technology, or standards development thought necessary to provide suitable reduction of likelihood or consequence to allow agency acceptance. Conclusion: The HSRB process has successfully identified a complete set of risks to human space travelers on planned exploration missions based on the best evidence available today. Risk mitigation plans have been established for the highest priority risks. Each risk will be reassessed annually to track the progress of our risk mitigation efforts.

  14. Disaster planning and mitigation technologies, interim technology inventory report: Report {number_sign}2

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Oggerino, J.; Rabinowitz, M.

    1998-06-01

    Natural and person-caused disasters are increasing in frequency and magnitude, and these disasters are taking an ever increasing economic and personal toll. This report identifies technologies that can help utilities, their customers, and their communities cope with disasters. Each year, 10,000 violent thunderstorms, 5,000 floods, and 1,000 tornadoes strike the US. These and other natural events have cost at least $8 billion per year over the last 30 years, and the annual costs are increasing rapidly. In 1996, the US experienced twice the yearly average of declared disasters than in the previous twenty years. Damage from Hurricane Andrew and themore » Northridge earthquake resulted in losses of $30 and $25 billion respectively. As a result of these and other costly disasters, utilities are losing business and commercial customers. In response, federal, state, and local organizations have steeped up efforts to deploy mitigation technologies and techniques and business recovery support. A task within the EPRI Disaster Planning and Mitigation Technologies (DP and MT) Target seeks to identify technologies that can help utilities and their customers prepare for and recover from natural disasters. This report provides concise and directed product information that can help member utilities and the communities they serve to plan for, mitigate, and recover quickly from natural and person-caused disasters. This will enable them to retain customers and reduce revenue losses.« less

  15. National Contingency Plan (NCP) Subpart J Product Schedule Fact Sheet

    EPA Pesticide Factsheets

    This section of the National Oil and Hazardous Substances Pollution Contingency Plan stipulates the criteria for listing and managing the use of dispersants and other chemical and biological agents used to mitigate oil spills.

  16. National Contingency Plan Subpart J

    EPA Pesticide Factsheets

    Subpart J of the National Oil and Hazardous Substances Pollution Contingency Plan (NCP) directs EPA to prepare a schedule of dispersants, other chemicals, and oil spill mitigating devices and substances that may be used to remove or control oil discharges.

  17. Quantification of Hungry Horse Reservoir Water Levels Needed to Maintain or Enhance Reservoir Fisheries; Methods and Data, 1983-1987 Summary Report.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    May, Bruce; Michael, Gary; Wachsmuth, John

    1988-06-01

    The Hungry Horse Reservoir study is part of the Northwest Power Planning Council's resident fish and wildlife plan. The plan is responsible for mitigating damages to the fish and wildlife resources caused by hydroelectric development in the Columbia River Basin. The major goal of our study is to quantify seasonal water levels needed to maintain or enhance the reservoir fishery. This study began in May, 1983, and the initial phase will be completed July, 1988. This report summarizes limnological, fish abundance, fish distribution and fish food habits data collected from 1983 to 1988. The effect of reservoir operation upon fishmore » habitat, fish food organisms and fish growth is discussed. 71 refs., 36 figs., 46 tabs.« less

  18. Improving Therapeutic Relationships: Joint Crisis Planning for Individuals With Psychotic Disorders.

    PubMed

    Farrelly, Simone; Lester, Helen; Rose, Diana; Birchwood, Max; Marshall, Max; Waheed, Waquas; Henderson, R Claire; Szmukler, George; Thornicroft, Graham

    2015-12-01

    Outcomes for individuals with psychosis remain far from acceptable. Recently, prominent psychiatrists have called for an improved understanding of the impact of social contexts, and how social contexts might influence the development and maintenance of mental health problems. A key social context for individuals with psychosis is the therapeutic relationship. As part of a trial of joint crisis planning in England, this qualitative study aimed to determine the mechanism through which joint crisis planning might affect the therapeutic relationship. Results suggest that routine processes in mental health care are affected by policy and organizational requirements for risk mitigation-aspects that undermine person-centered approaches. In contrast, strong therapeutic relationships are characterized by individualized care and reliable and respectful treatment. The Joint Crisis Plan intervention partially succeeded in reducing contextual influences on routine role enactments, facilitating the demonstration of respect and improving the therapeutic relationship. © The Author(s) 2015.

  19. GHG emission mitigation measures and technologies in the Czech Republic

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Tichy, M.

    1996-12-31

    The paper presents a short overview of main results in two fields: projection of GHG emission from energy sector in the Czech Republic and assessment of technologies and options for GHG mitigation. The last part presents an overview of measures that were prepared for potential inclusion to the Czech Climate Change Action Plan.

  20. 78 FR 13844 - Change in Submission Requirements for State Mitigation Plans

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-01

    ... protecting human lives and the environment. No action that FEMA can anticipate under this rule will have a... to reduce damage to lives, property, and the economy from future disasters. State, Tribal, and local... funding for eligible mitigation activities that reduce disaster losses and protect life and property from...

  1. Hungry Horse Dam Wildlife Habitat Enhancement Project: Long-Term Habitat Management Plan, Elk and Mule Deer Winter Range Enhancement, Firefighter Mountain and Spotted Bear Winter Ranges.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Casey, Daniel; Malta, Patrick

    1990-06-01

    Project goals are to rehabilitate 1120 acres of big game (elk and mule deer, Odocoileus hemionus) winter range on the Hungry Horse and Spotted Bear Districts of Flathead National Forest lands adjacent to Hungry Horse Reservoir. This project represents the initial phase of implementation toward the mitigation goal. A minimum of 547 acres Trust-funded enhancements are called for in this plan. The remainder are part of the typical Forest Service management activities for the project area. Monitor and evaluate the effects of project implementation on the big game forage base and elk and mule deer populations in the project area.more » Monitor enhancement success to determine effective acreage to be credited against mitigation goal. Additional enhancement acreage will be selected elsewhere in the Flathead Forest or other lands adjacent'' to the reservoir based on progress toward the mitigation goal as determined through monitoring. The Wildlife Mitigation Trust Fund Advisory Committee will serve to guide decisions regarding future enhancement efforts. 7 refs.« less

  2. An effective public health program to reduce urban heat islands in Québec, Canada.

    PubMed

    Beaudoin, Mélanie; Gosselin, Pierre

    2016-09-01

    In 2005, the Government of the Province of Québec, Canada, adopted the Climate Change Action Plan for 2006 - 2012. The Institut national de santé publique du Québec (National Institute of Public Health of Québec), charged with implementing the health adaptation component of the Plan, worked to mitigate urban heat islands (UHI) by funding and evaluating 40 pilot projects. These projects explored different methods of fighting UHIs by greening cities in a participative and mobilizing approach led mainly by non-governmental organizations and municipalities. An assessment of temperatures before and after implementing various methods demonstrated that some actions enabled significant gains of coolness and more efficiently mitigated heat (reduction of concrete/asphalt surfaces, increasing vegetation, etc.). An assessment of quality of life showed that projects were positively received by users, especially by those living in vulnerable situations. A lifecycle analysis showed that from the environmental perspective, UHI mitigation measures that do not require fertilization or maintenance are preferable. Finally, communication efforts that raise awareness of UHI and mitigation are of significant importance to program success.

  3. Risk-based zoning for urbanizing floodplains.

    PubMed

    Porse, Erik

    2014-01-01

    Urban floodplain development brings economic benefits and enhanced flood risks. Rapidly growing cities must often balance the economic benefits and increased risks of floodplain settlement. Planning can provide multiple flood mitigation and environmental benefits by combining traditional structural measures such as levees, increasingly popular landscape and design features (green infrastructure), and non-structural measures such as zoning. Flexibility in both structural and non-structural options, including zoning procedures, can reduce flood risks. This paper presents a linear programming formulation to assess cost-effective urban floodplain development decisions that consider benefits and costs of development along with expected flood damages. It uses a probabilistic approach to identify combinations of land-use allocations (residential and commercial development, flood channels, distributed runoff management) and zoning regulations (development zones in channel) to maximize benefits. The model is applied to a floodplain planning analysis for an urbanizing region in the Baja Sur peninsula of Mexico. The analysis demonstrates how (1) economic benefits drive floodplain development, (2) flexible zoning can improve economic returns, and (3) cities can use landscapes, enhanced by technology and design, to manage floods. The framework can incorporate additional green infrastructure benefits, and bridges typical disciplinary gaps for planning and engineering.

  4. Coal gasification systems engineering and analysis, volume 2

    NASA Technical Reports Server (NTRS)

    1980-01-01

    The major design related features of each generic plant system were characterized in a catalog. Based on the catalog and requirements data, approximately 17 designs and cost estimates were developed for MBG and alternate products. A series of generic trade studies was conducted to support all of the design studies. A set of cost and programmatic analyses were conducted to supplement the designs. The cost methodology employed for the design and sensitivity studies was documented and implemented in a computer program. Plant design and construction schedules were developed for the K-T, Texaco, and B&W MBG plant designs. A generic work breakdown structure was prepared, based on the K-T design, to coincide with TVA's planned management approach. An extensive set of cost sensitivity analyses was completed for K-T, Texaco, and B&W design. Product price competitiveness was evaluated for MBG and the alternate products. A draft management policy and procedures manual was evaluated. A supporting technology development plan was developed to address high technology risk issues. The issues were identified and ranked in terms of importance and tractability, and a plan developed for obtaining data or developing technology required to mitigate the risk.

  5. Development of a prototype Typhoon Risk Model over the Korean Peninsula

    NASA Astrophysics Data System (ADS)

    Kim, K. Y.; Cocke, S.; Shin, D. W.; CHOI, M.; Kwon, J.

    2016-12-01

    Risk can be defined as probability of a given hazard of a given level causing a particular level of loss of damage (Alexander, 2000). Risk management is important for mitigation and developing plans for emergencies. More effective risk management strategies can help reduce potential losses from natural disasters like typhoon, floods, earthquakes, and so on. We are developing a prototype typhoon risk model to assess the current and potentially future hazard due to typhoons in the Western Pacific. To develop the typhoon risk model, a variety of sources of data over Korea are used such as population, damage to buildings, agriculture, ships, etc. The model is based on proven concepts used in catastrophe models that have been used in the U.S. and other regions of the world. Recently, the sea surface temperatures where typhoons have occurred have tended to increase. According to recent studies of global warming, the intensity of typhoons could increase, and the frequency of typhoons may decrease in the future climate. The prototype risk model can help us determine the change in risk as a consequence of the change in typhoon activity. We focus on Korea and other regions of interest to Korean insurers, re-insurers, and related industries. The model can potentially be coupled to various damage models or emergency management systems for planning and mitigation. In addition, the assessment would be useful for emergency planners, coastal community planners, and private and governmental insurance programs. This work was funded by the Korea Meteorological Administration Research and Development Program under Grant KMIPA2016-8030.

  6. Development of an integrated model for energy systems planning and carbon dioxide mitigation under uncertainty - Tradeoffs between two-level decision makers.

    PubMed

    Jin, S W; Li, Y P; Xu, L P

    2018-07-01

    A bi-level fuzzy programming (BFLP) method was developed for energy systems planning (ESP) and carbon dioxide (CO 2 ) mitigation under uncertainty. BFLP could handle fuzzy information and leader-follower problem in decision-making processes. It could also address the tradeoffs among different decision makers in two decision-making levels through prioritizing the most important goal. Then, a BFLP-ESP model was formulated for planning energy system of Beijing, in which the upper-level objective is to minimize CO 2 emission and the lower-level objective is to minimize the system cost. Results provided a range of decision alternatives that corresponded to a tradeoff between system optimality and reliability under uncertainty. Compared to the single-level model with a target to minimize system cost, the amounts of pollutant/CO 2 emissions from BFLP-ESP were reduced since the study system would prefer more clean energies (i.e. natural gas, LPG and electricity) to replace coal fuel. Decision alternatives from BFLP were more beneficial for supporting Beijing to adjust its energy mix and enact its emission-abatement policy. Results also revealed that the low-carbon policy for power plants (e.g., shutting down all coal-fired power plants) could lead to a potentially increment of imported energy for Beijing, which would increase the risk of energy shortage. The findings could help decision makers analyze the interactions between different stakeholders in ESP and provide useful information for policy design under uncertainty. Copyright © 2018 Elsevier Inc. All rights reserved.

  7. The Role of Compensation Criteria to Minimize Face-Time Bias and Support Faculty Career Flexibility

    PubMed Central

    Elsbach, Kimberly D.; Villablanca, Amparo C.

    2016-01-01

    Work-life balance is important to recruitment and retention of the younger generation of medical faculty, but medical school flexibility policies have not been fully effective. We have reported that our school’s policies are underutilized due to faculty concerns about looking uncommitted to career or team. Since policies include leaves and accommodations that reduce physical presence, faculty may fear “face-time bias,” which negatively affects evaluation of those not “seen” at work. Face-time bias is reported to negatively affect salary and career progress. We explored face-time bias on a leadership level and described development of compensation criteria intended to mitigate face-time bias, raise visibility, and reward commitment and contribution to team/group goals. Leaders from 6 partner departments participated in standardized interviews and group meetings. Ten compensation plans were analyzed, and published literature was reviewed. Leaders did not perceive face-time issues but saw team pressure and perception of availability as performance motivators. Compensation plans were multifactor productivity based with many quantifiable criteria; few addressed team contributions. Using these findings, novel compensation criteria were developed based on a published model to mitigate face-time bias associated with team perceptions. Criteria for organizational citizenship to raise visibility and reward group outcomes were included. We conclude that team pressure and perception of availability have the potential to lead to bias and may contribute to underuse of flexibility policies. Recognizing organizational citizenship and cooperative effort via specific criteria in a compensation plan may enhance a culture of flexibility. These novel criteria have been effective in one pilot department. PMID:28725757

  8. The enviornmental assessment of a contemporary coal mining system

    NASA Technical Reports Server (NTRS)

    Dutzi, E. J.; Sullivan, P. J.; Hutchinson, C. F.; Stevens, C. M.

    1980-01-01

    A contemporary underground coal mine in eastern Kentucky was assessed in order to determine potential off-site and on-site environmental impacts associated with the mining system in the given environmental setting. A 4 section, continuous room and pillor mine plan was developed for an appropriate site in eastern Kentucky. Potential environmental impacts were identified, and mitigation costs determined. The major potential environmental impacts were determined to be: acid water drainage from the mine and refuse site, uneven subsidence of the surface as a result of mining activity, and alteration of ground water aquifers in the subsidence zone. In the specific case examined, the costs of environmental impact mitigation to levels prescribed by regulations would not exceed $1/ton of coal mined, and post mining land values would not be affected.

  9. Planning ahead for asteroid and comet hazard mitigation, phase 1: parameter space exploration and scenario modeling

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Plesko, Catherine S; Clement, R Ryan; Weaver, Robert P

    2009-01-01

    The mitigation of impact hazards resulting from Earth-approaching asteroids and comets has received much attention in the popular press. However, many questions remain about the near-term and long-term, feasibility and appropriate application of all proposed methods. Recent and ongoing ground- and space-based observations of small solar-system body composition and dynamics have revolutionized our understanding of these bodies (e.g., Ryan (2000), Fujiwara et al. (2006), and Jedicke et al. (2006)). Ongoing increases in computing power and algorithm sophistication make it possible to calculate the response of these inhomogeneous objects to proposed mitigation techniques. Here we present the first phase of amore » comprehensive hazard mitigation planning effort undertaken by Southwest Research Institute and Los Alamos National Laboratory. We begin by reviewing the parameter space of the object's physical and chemical composition and trajectory. We then use the radiation hydrocode RAGE (Gittings et al. 2008), Monte Carlo N-Particle (MCNP) radiation transport (see Clement et al., this conference), and N-body dynamics codes to explore the effects these variations in object properties have on the coupling of energy into the object from a variety of mitigation techniques, including deflection and disruption by nuclear and conventional munitions, and a kinetic impactor.« less

  10. The Global Positioning System for Military Users: Current Modernization Plans and Alternatives

    DTIC Science & Technology

    2011-10-01

    stronger signal would not be available. That drawback might be mitigated, however, by the widespread availability on the commercial market of small...development efforts needed to achieve such reductions would have associated costs. An additional drawback of Option 2 is that operation of iGPS...the Foucault pendulum but uses a vibrating element, known as a Micro Electro-Mechanical System, instead of an actual pendulum . iGPS Module. The

  11. The Indian Hill Petroglyph Site, 14EW1, Kanopolis Lake: Development of Alternative Mitigation Plans

    DTIC Science & Technology

    1980-01-01

    flood control in the Smoky Hill River basin in 1948. The dam is approxi- mately 33 miles southwest of Salina, Kansas. The lake stores 61,400 acre feet...The Plainview, Midland, Milnesand, and Meserve are of the former type; the Scottsbluff, Eden, Cody, Angostura (or Frederick), and Agate Basin ...circular to irregular elliptical shallow basins , post molds, central firepits, and refuse pits (Wedel 1959: 552). Diagnostic artifacts recovered

  12. GLIMPSE – A computational framework for supporting state-level environmental and energy planning

    EPA Pesticide Factsheets

    GLIMPSE is an EPA modeling tool for environmental and energy planning used to find U.S. policy scenarios that simultaneously improve air quality, human health, reduce impacts to ecosystems, and mitigate climate change.

  13. A Collaborative Web-Based Approach to Planning Research, Integration, and Testing Using a Wiki

    NASA Technical Reports Server (NTRS)

    Delaney, Michael M.; Koshimoto, Edwin T.; Noble, Deleena; Duggan, Christopher

    2010-01-01

    The National Aeronautics and Space Administration Integrated Vehicle Health Management program touches on many different research areas while striving to enable the automated detection, diagnosis, prognosis, and mitigation of adverse events at the aircraft and system level. At the system level, the research focus is on the evaluation of multidisciplinary integrated methods, tools, and technologies for achieving the program goal. The participating program members form a diverse group of government, industry, and academic researchers. The program team developed the Research and Test Integration Plan in order to track significant test and evaluation activities, which are important for understanding, demonstrating, and communicating the overall project state and project direction. The Plan is a living document, which allows the project team the flexibility to construct conceptual test scenarios and to track project resources. The Plan also incorporates several desirable feature requirements for Plan users and maintainers. A wiki has proven to be the most efficient and effective means of implementing the feature requirements for the Plan. The wiki has proven very valuable as a research project management tool, and there are plans to expand its scope.

  14. Idaho Habitat Evaluation for Off-Site Mitigation Record : Annual Report 1988.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Idaho. Dept. of Fish and Game.

    1990-03-01

    The Idaho Department of Fish and Game (IDFG) has been monitoring and evaluating existing and proposed habitat improvement projects for steelhead and chinook in the Clearwater and Salmon subbasins since 1984. Projects included in the monitoring are funded by, or proposed for funding by, the Bonneville Power Administration (BPA) under the Northwest Power Planning Act as off-site mitigation for downstream hydropower development on the Snake and Columbia Rivers. This monitoring project is also funded under the same authority. A mitigation record is being developed to use actual and potential increases in smolt production as the best measures of benefit frommore » a habitat improvement project. This project is divided into two subprojects: general and intensive monitoring. Primary objectives of the general monitoring subproject are to determine natural production increases due to habitat improvement projects in terms of parr production and to determine natural production status and trends in Idaho. The second objective is accomplished by combining parr density from monitoring and evaluation of BPA habitat projects and from other IDFG management and research activities. The primary objective of the intensive monitoring subproject is to determine the relationships between spawning escapement, parr production, and smolt production in two Idaho streams; the upper Salmon River and Crooked River. Results of the intensive monitoring will be used to estimate mitigation benefits in terms of smolt production and to interpret natural production monitoring in Idaho. 30 refs., 19 figs., 34 tabs.« less

  15. Climate mitigation is not the only benefit of a national energy system

    NASA Astrophysics Data System (ADS)

    Clack, C.

    2016-12-01

    Many speculate that the main driving force for a continental scale energy system is for climate mitigation. While this is a strong driver, there are multiple co-benefits that emerge from such a transition when purely driven by costs. These components could be managed within a planned system to provide a close-to-optimal solution that enhances the probability of realization. It is shown that these co-benefits of a continental scale electric system occur at costs lower than existing ones. That means there are multiple additional savings without extra costs or effort. The disadvantage is coordination between large geographic regions that could cause more complexity in planning. The main finding from different versions of the NEWS simulator is that carbon mitigation is enhanced by larger systems. In addition, there are increased jobs, reduced water consumption, Sulphur dioxide emissions, Nitrogen oxide emissions, a more distributed electric system and a lower cost of electricity.

  16. Social and ethical perspectives of landslide risk mitigation measures

    NASA Astrophysics Data System (ADS)

    Kalsnes, Bjørn; Vangelsten, Bjørn V.

    2015-04-01

    Landslide risk may be mitigated by use of a wide range of measures. Mitigation and prevention options may include (1) structural measures to reduce the frequency, severity or exposure to the hazard, (2) non-structural measures, such as land-use planning and early warning systems, to reduce the hazard frequency and consequences, and (3) measures to pool and transfer the risks. In a given situation the appropriate system of mitigation measures may be a combination of various types of measures, both structural and non-structural. In the process of choosing mitigation measures for a given landslide risk situation, the role of the geoscientist is normally to propose possible mitigation measures on basis of the risk level and technical feasibility. Social and ethical perspectives are often neglected in this process. However, awareness of the need to consider social as well as ethical issues in the design and management of mitigating landslide risk is rising. There is a growing understanding that technical experts acting alone cannot determine what will be considered the appropriate set of mitigation and prevention measures. Issues such as environment versus development, questions of acceptable risk, who bears the risks and benefits, and who makes the decisions, also need to be addressed. Policymakers and stakeholders engaged in solving environmental risk problems are increasingly recognising that traditional expert-based decision-making processes are insufficient. This paper analyse the process of choosing appropriate mitigation measures to mitigate landslide risk from a social and ethical perspective, considering technical, cultural, economical, environmental and political elements. The paper focus on stakeholder involvement in the decision making process, and shows how making strategies for risk communication is a key for a successful process. The study is supported by case study examples from Norway and Italy. In the Italian case study, three different risk mitigation options was presented to the local community. The options were based on a thorough stakeholder involvement process ending up in three different views on how to deal with the landslide risk situation: i) protect lives and properties (hierarchical) ; ii) careful stewardship of the mountains (egalitarian); and iii) rational individual choice (individualist).

  17. Modeling forest planning trade-offs on the Colorado Front Range using MAGIS, an optimization, spatial decision support system

    Treesearch

    Edward B. Butler

    2005-01-01

    The fires of 2000 and 2002 catalyzed a national mandate for fuel treatment programs to facilitate wildfire mitigation, yet the issues that need to be considered when planning large landscape projects are daunting, often ending in gridlock due to planning conflicts. Hazardous fuels maps help little when planning for integrated, system-wide ecological objectives and fail...

  18. JPL space robotics: Present accomplishments and future thrusts

    NASA Astrophysics Data System (ADS)

    Weisbin, C. R.; Hayati, S. A.; Rodriguez, G.

    1994-10-01

    Complex missions require routine and unscheduled inspection for safe operation. The purpose of research in this task is to facilitate structural inspection of the planned Space Station while mitigating the need for extravehicular activity (EVA), and giving the operator supervisory control over detailed and somewhat mundane, but important tasks. The telerobotic system enables inspection relative to a given reference (e.g., the status of the facility at the time of the last inspection) and alerts the operator to potential anomalies for verification and action. There are two primary objectives of this project: (1) To develop technologies that enable well-integrated NASA ground-to-orbit telerobotics operations, and (2) to develop a prototype common architecture workstation which implements these capabilities for other NASA technology projects and planned NASA flight applications. This task develops and supports three telerobot control modes which are applicable to time delay operation: Preview teleoperation, teleprogramming, and supervised autonomy.

  19. A web-based 3D visualisation and assessment system for urban precinct scenario modelling

    NASA Astrophysics Data System (ADS)

    Trubka, Roman; Glackin, Stephen; Lade, Oliver; Pettit, Chris

    2016-07-01

    Recent years have seen an increasing number of spatial tools and technologies for enabling better decision-making in the urban environment. They have largely arisen because of the need for cities to be more efficiently planned to accommodate growing populations while mitigating urban sprawl, and also because of innovations in rendering data in 3D being well suited for visualising the urban built environment. In this paper we review a number of systems that are better known and more commonly used in the field of urban planning. We then introduce Envision Scenario Planner (ESP), a web-based 3D precinct geodesign, visualisation and assessment tool, developed using Agile and Co-design methods. We provide a comprehensive account of the tool, beginning with a discussion of its design and development process and concluding with an example use case and a discussion of the lessons learned in its development.

  20. JPL space robotics: Present accomplishments and future thrusts

    NASA Technical Reports Server (NTRS)

    Weisbin, C. R.; Hayati, S. A.; Rodriguez, G.

    1994-01-01

    Complex missions require routine and unscheduled inspection for safe operation. The purpose of research in this task is to facilitate structural inspection of the planned Space Station while mitigating the need for extravehicular activity (EVA), and giving the operator supervisory control over detailed and somewhat mundane, but important tasks. The telerobotic system enables inspection relative to a given reference (e.g., the status of the facility at the time of the last inspection) and alerts the operator to potential anomalies for verification and action. There are two primary objectives of this project: (1) To develop technologies that enable well-integrated NASA ground-to-orbit telerobotics operations, and (2) to develop a prototype common architecture workstation which implements these capabilities for other NASA technology projects and planned NASA flight applications. This task develops and supports three telerobot control modes which are applicable to time delay operation: Preview teleoperation, teleprogramming, and supervised autonomy.

  1. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Tang Bosin; Wong Siuwai; Lau, Milton Chi-hong

    This study examines the current prospects for and obstacles facing the implementation of social impact assessment (SIA) and participatory planning in the People's Republic of China. During the past two decades, rapid urbanisation and the conversion of rural land for urban development have led to numerous social conflicts and tensions between the Chinese government and its people. SIA and public participation in development decisions have received increasing attention from the Chinese authorities as possible ways to tackle the problem. Based on a Guangzhou case study, this paper argues that the assessment and mitigation of adverse impacts on the community frommore » urban development have been carried out with different objectives, core values and principles when compared with those in Western societies. It concludes that the poor prospects of SIA and collaborative planning in China lie not only in the weak framework for environmental legislation, but also in all institutions concerning state-society relations, the socialist governing ideology and traditional Chinese culture.« less

  2. Effects of urban form on the urban heat island effect based on spatial regression model.

    PubMed

    Yin, Chaohui; Yuan, Man; Lu, Youpeng; Huang, Yaping; Liu, Yanfang

    2018-09-01

    The urban heat island (UHI) effect is becoming more of a concern with the accelerated process of urbanization. However, few studies have examined the effect of urban form on land surface temperature (LST) especially from an urban planning perspective. This paper used spatial regression model to investigate the effects of both land use composition and urban form on LST in Wuhan City, China, based on the regulatory planning management unit. Landsat ETM+ image data was used to estimate LST. Land use composition was calculated by impervious surface area proportion, vegetated area proportion, and water proportion, while urban form indicators included sky view factor (SVF), building density, and floor area ratio (FAR). We first tested for spatial autocorrelation of urban LST, which confirmed that a traditional regression method would be invalid. A spatial error model (SEM) was chosen because its parameters were better than a spatial lag model (SLM). The results showed that urban form metrics should be the focus for mitigation efforts of UHI effects. In addition, analysis of the relationship between urban form and UHI effect based on the regulatory planning management unit was helpful for promoting corresponding UHI effect mitigation rules in practice. Finally, the spatial regression model was recommended to be an appropriate method for dealing with problems related to the urban thermal environment. Results suggested that the impact of urbanization on the UHI effect can be mitigated not only by balancing various land use types, but also by optimizing urban form, which is even more effective. This research expands the scientific understanding of effects of urban form on UHI by explicitly analyzing indicators closely related to urban detailed planning at the level of regulatory planning management unit. In addition, it may provide important insights and effective regulation measures for urban planners to mitigate future UHI effects. Copyright © 2018 Elsevier B.V. All rights reserved.

  3. Urban Policies and Earthquake Risk Mitigation

    NASA Astrophysics Data System (ADS)

    Sarlo, Antonella

    2008-07-01

    The paper aims at proposing some considerations about some recent experiences of research carried out on the theme of earthquake risk mitigation and combining policies and actions of mitigation with urban development strategies. The objective was to go beyond the classical methodological approach aiming at defining a "technical" evaluation of the earthquake risk through a procedure which can correlate the three "components" of danger, exposure and vulnerability. These researches experiment, in terms of methodology and application, with a new category of interpretation and strategy: the so-called Struttura Urbana Minima (Minimum urban structure). Actually, the introduction of the Struttura Urbana Minima establishes a different approach towards the theme of safety in the field of earthquake risk, since it leads to a wider viewpoint, combining the building aspect of the issue with the purely urban one, involving not only town planning, but also social and managerial implications. In this sense the constituent logic of these researches is strengthened by two fundamental issues: - The social awareness of earthquake; - The inclusion of mitigation policies in the ordinary strategies for town and territory management. Three main aspects of the first point, that is of the "social awareness of earthquake", characterize this issue and demand to be considered within a prevention policy: - The central role of the risk as a social production, - The central role of the local community consent, - The central role of the local community capability to plan Therefore, consent, considered not only as acceptance, but above all as participation in the elaboration and implementation of choices, plays a crucial role in the wider issue of prevention policies. As far as the second point is concerned, the inclusion of preventive mitigation policies in ordinary strategies for the town and territory management demands the identification of criteria of choice and priorities of intervention and, as a consequence, the opportunity to promote an approach to the theme of mitigation policies realized through strategic principles and systemic logics able to shift the problem from the building to the town. The critical aspects of this theme are tied to three main issues: - The sharing of the way of interpreting town planning, - The integration of multiple objectives in one intervention tool, - The measures which can be adopted for an effective prevention policy. The above-mentioned elements have inspired these researches experimented on Calabrian towns. In particular, in this paper the experience carried out on Reggio Calabria is proposed. Its cultural roots derive from the principles and criteria experimented in small Calabrian towns, but it modifies them according to the complexity of the urban settlement, introducing also some experimental concepts and methodological approaches.

  4. Imaging and dosimetric errors in 4D PET/CT-guided radiotherapy from patient-specific respiratory patterns: a dynamic motion phantom end-to-end study

    NASA Astrophysics Data System (ADS)

    Bowen, S. R.; Nyflot, M. J.; Herrmann, C.; Groh, C. M.; Meyer, J.; Wollenweber, S. D.; Stearns, C. W.; Kinahan, P. E.; Sandison, G. A.

    2015-05-01

    Effective positron emission tomography / computed tomography (PET/CT) guidance in radiotherapy of lung cancer requires estimation and mitigation of errors due to respiratory motion. An end-to-end workflow was developed to measure patient-specific motion-induced uncertainties in imaging, treatment planning, and radiation delivery with respiratory motion phantoms and dosimeters. A custom torso phantom with inserts mimicking normal lung tissue and lung lesion was filled with [18F]FDG. The lung lesion insert was driven by six different patient-specific respiratory patterns or kept stationary. PET/CT images were acquired under motionless ground truth, tidal breathing motion-averaged (3D), and respiratory phase-correlated (4D) conditions. Target volumes were estimated by standardized uptake value (SUV) thresholds that accurately defined the ground-truth lesion volume. Non-uniform dose-painting plans using volumetrically modulated arc therapy were optimized for fixed normal lung and spinal cord objectives and variable PET-based target objectives. Resulting plans were delivered to a cylindrical diode array at rest, in motion on a platform driven by the same respiratory patterns (3D), or motion-compensated by a robotic couch with an infrared camera tracking system (4D). Errors were estimated relative to the static ground truth condition for mean target-to-background (T/Bmean) ratios, target volumes, planned equivalent uniform target doses, and 2%-2 mm gamma delivery passing rates. Relative to motionless ground truth conditions, PET/CT imaging errors were on the order of 10-20%, treatment planning errors were 5-10%, and treatment delivery errors were 5-30% without motion compensation. Errors from residual motion following compensation methods were reduced to 5-10% in PET/CT imaging, <5% in treatment planning, and <2% in treatment delivery. We have demonstrated that estimation of respiratory motion uncertainty and its propagation from PET/CT imaging to RT planning, and RT delivery under a dose painting paradigm is feasible within an integrated respiratory motion phantom workflow. For a limited set of cases, the magnitude of errors was comparable during PET/CT imaging and treatment delivery without motion compensation. Errors were moderately mitigated during PET/CT imaging and significantly mitigated during RT delivery with motion compensation. This dynamic motion phantom end-to-end workflow provides a method for quality assurance of 4D PET/CT-guided radiotherapy, including evaluation of respiratory motion compensation methods during imaging and treatment delivery.

  5. Imaging and dosimetric errors in 4D PET/CT-guided radiotherapy from patient-specific respiratory patterns: a dynamic motion phantom end-to-end study.

    PubMed

    Bowen, S R; Nyflot, M J; Herrmann, C; Groh, C M; Meyer, J; Wollenweber, S D; Stearns, C W; Kinahan, P E; Sandison, G A

    2015-05-07

    Effective positron emission tomography / computed tomography (PET/CT) guidance in radiotherapy of lung cancer requires estimation and mitigation of errors due to respiratory motion. An end-to-end workflow was developed to measure patient-specific motion-induced uncertainties in imaging, treatment planning, and radiation delivery with respiratory motion phantoms and dosimeters. A custom torso phantom with inserts mimicking normal lung tissue and lung lesion was filled with [(18)F]FDG. The lung lesion insert was driven by six different patient-specific respiratory patterns or kept stationary. PET/CT images were acquired under motionless ground truth, tidal breathing motion-averaged (3D), and respiratory phase-correlated (4D) conditions. Target volumes were estimated by standardized uptake value (SUV) thresholds that accurately defined the ground-truth lesion volume. Non-uniform dose-painting plans using volumetrically modulated arc therapy were optimized for fixed normal lung and spinal cord objectives and variable PET-based target objectives. Resulting plans were delivered to a cylindrical diode array at rest, in motion on a platform driven by the same respiratory patterns (3D), or motion-compensated by a robotic couch with an infrared camera tracking system (4D). Errors were estimated relative to the static ground truth condition for mean target-to-background (T/Bmean) ratios, target volumes, planned equivalent uniform target doses, and 2%-2 mm gamma delivery passing rates. Relative to motionless ground truth conditions, PET/CT imaging errors were on the order of 10-20%, treatment planning errors were 5-10%, and treatment delivery errors were 5-30% without motion compensation. Errors from residual motion following compensation methods were reduced to 5-10% in PET/CT imaging, <5% in treatment planning, and <2% in treatment delivery. We have demonstrated that estimation of respiratory motion uncertainty and its propagation from PET/CT imaging to RT planning, and RT delivery under a dose painting paradigm is feasible within an integrated respiratory motion phantom workflow. For a limited set of cases, the magnitude of errors was comparable during PET/CT imaging and treatment delivery without motion compensation. Errors were moderately mitigated during PET/CT imaging and significantly mitigated during RT delivery with motion compensation. This dynamic motion phantom end-to-end workflow provides a method for quality assurance of 4D PET/CT-guided radiotherapy, including evaluation of respiratory motion compensation methods during imaging and treatment delivery.

  6. Imaging and dosimetric errors in 4D PET/CT-guided radiotherapy from patient-specific respiratory patterns: a dynamic motion phantom end-to-end study

    PubMed Central

    Bowen, S R; Nyflot, M J; Hermann, C; Groh, C; Meyer, J; Wollenweber, S D; Stearns, C W; Kinahan, P E; Sandison, G A

    2015-01-01

    Effective positron emission tomography/computed tomography (PET/CT) guidance in radiotherapy of lung cancer requires estimation and mitigation of errors due to respiratory motion. An end-to-end workflow was developed to measure patient-specific motion-induced uncertainties in imaging, treatment planning, and radiation delivery with respiratory motion phantoms and dosimeters. A custom torso phantom with inserts mimicking normal lung tissue and lung lesion was filled with [18F]FDG. The lung lesion insert was driven by 6 different patient-specific respiratory patterns or kept stationary. PET/CT images were acquired under motionless ground truth, tidal breathing motion-averaged (3D), and respiratory phase-correlated (4D) conditions. Target volumes were estimated by standardized uptake value (SUV) thresholds that accurately defined the ground-truth lesion volume. Non-uniform dose-painting plans using volumetrically modulated arc therapy (VMAT) were optimized for fixed normal lung and spinal cord objectives and variable PET-based target objectives. Resulting plans were delivered to a cylindrical diode array at rest, in motion on a platform driven by the same respiratory patterns (3D), or motion-compensated by a robotic couch with an infrared camera tracking system (4D). Errors were estimated relative to the static ground truth condition for mean target-to-background (T/Bmean) ratios, target volumes, planned equivalent uniform target doses (EUD), and 2%-2mm gamma delivery passing rates. Relative to motionless ground truth conditions, PET/CT imaging errors were on the order of 10–20%, treatment planning errors were 5–10%, and treatment delivery errors were 5–30% without motion compensation. Errors from residual motion following compensation methods were reduced to 5–10% in PET/CT imaging, < 5% in treatment planning, and < 2% in treatment delivery. We have demonstrated that estimation of respiratory motion uncertainty and its propagation from PET/CT imaging to RT planning, and RT delivery under a dose painting paradigm is feasible within an integrated respiratory motion phantom workflow. For a limited set of cases, the magnitude of errors was comparable during PET/CT imaging and treatment delivery without motion compensation. Errors were moderately mitigated during PET/CT imaging and significantly mitigated during RT delivery with motion compensation. This dynamic motion phantom end-to-end workflow provides a method for quality assurance of 4D PET/CT-guided radiotherapy, including evaluation of respiratory motion compensation methods during imaging and treatment delivery. PMID:25884892

  7. Environmental impact assessment using a utility-based recursive evidential reasoning approach for structural flood mitigation measures in Metro Manila, Philippines.

    PubMed

    Gilbuena, Romeo; Kawamura, Akira; Medina, Reynaldo; Nakagawa, Naoko; Amaguchi, Hideo

    2013-12-15

    In recent years, the practice of environmental impact assessment (EIA) has created significant awareness on the role of environmentally sound projects in sustainable development. In view of the recent studies on the effects of climate change, the Philippine government has given high priority to the construction of flood control structures to alleviate the destructive effects of unmitigated floods, especially in highly urbanized areas like Metro Manila. EIA thus, should be carefully and effectively carried out to maximize or optimize the potential benefits that can be derived from structural flood mitigation measures (SFMMs). A utility-based environmental assessment approach may significantly aid flood managers and decision-makers in planning for effective and environmentally sound SFMM projects. This study proposes a utility-based assessment approach using the rapid impact assessment matrix (RIAM) technique, coupled with the evidential reasoning approach, to rationally and systematically evaluate the ecological and socio-economic impacts of 4 planned SFMM projects (i.e. 2 river channel improvements and 2 new open channels) in Metro Manila. Results show that the overall environmental effects of each of the planned SFMM projects are positive, which indicate that the utility of the positive impacts would generally outweigh the negative impacts. The results also imply that the planned river channel improvements will yield higher environmental benefits over the planned open channels. This study was able to present a clear and rational approach in the examination of overall environmental effects of SFMMs, which provides valuable insights that can be used by decision-makers and policy makers to improve the EIA practice and evaluation of projects in the Philippines. Copyright © 2013 Elsevier Ltd. All rights reserved.

  8. Integrating spatial support tools into strategic planning-SEA of the GMS North-South Economic Corridor Strategy and Action Plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ramachandran, Pavit, E-mail: pramachandran@adb.org; Linde, Lothar, E-mail: lothar.linde@yahoo.de

    The GMS countries, supported by the Asian Development Bank, have adopted a holistic, multidimensional approach to strengthen infrastructural linkages and facilitate cross border trade through (i) the establishment of a trans-boundary road connecting two economic nodes across marginalised areas, followed by 2) facilitation of environmentally and socially sound investments in these newly connected areas as a means to develop livelihoods. The North-South Economic Corridor is currently in its second phase of development, with investment opportunities to be laid out in the NSEC Strategy and Action Plan (SAP). It targets the ecologically and culturally sensitive border area between PR China's Yunnanmore » Province, Northern Lao PDR, and Thailand. A trans-boundary, cross-sectoral Strategic Environmental Assessment was conducted to support the respective governments in assessing potential environmental and social impacts, developing alternatives and mitigation options, and feeding the findings back into the SAP writing process. Given the spatial dimension of corridor development-both with regard to opportunities and risks-particular emphasis was put in the application of spatial modelling tools to help geographically locate and quantify impacts as a means to guide interventions and set priorities.« less

  9. Failure mode and effects analysis of the universal anaesthesia machine in two tertiary care hospitals in Sierra Leone

    PubMed Central

    Rosen, M. A.; Sampson, J. B.; Jackson, E. V.; Koka, R.; Chima, A. M.; Ogbuagu, O. U.; Marx, M. K.; Koroma, M.; Lee, B. H.

    2014-01-01

    Background Anaesthesia care in developed countries involves sophisticated technology and experienced providers. However, advanced machines may be inoperable or fail frequently when placed into the austere medical environment of a developing country. Failure mode and effects analysis (FMEA) is a method for engaging local staff in identifying real or potential breakdowns in processes or work systems and to develop strategies to mitigate risks. Methods Nurse anaesthetists from the two tertiary care hospitals in Freetown, Sierra Leone, participated in three sessions moderated by a human factors specialist and an anaesthesiologist. Sessions were audio recorded, and group discussion graphically mapped by the session facilitator for analysis and commentary. These sessions sought to identify potential barriers to implementing an anaesthesia machine designed for austere medical environments—the universal anaesthesia machine (UAM)—and also engaging local nurse anaesthetists in identifying potential solutions to these barriers. Results Participating Sierra Leonean clinicians identified five main categories of failure modes (resource availability, environmental issues, staff knowledge and attitudes, and workload and staffing issues) and four categories of mitigation strategies (resource management plans, engaging and educating stakeholders, peer support for new machine use, and collectively advocating for needed resources). Conclusions We identified factors that may limit the impact of a UAM and devised likely effective strategies for mitigating those risks. PMID:24833727

  10. Groundwater Interim Measures Work Plan for the Former Chemical Plant

    EPA Pesticide Factsheets

    May 2012 Groundwater IMWP, revised per EPA's approval, focuses on the installation of a groundwater containment system to mitigate groundwater migration from the former plant. A prior 2002 work plan is included in its entirety in Appendix B.

  11. Hurricanes: Are You Prepared?

    PubMed

    Rodriguez, Fred H; Petersen, John; Selvaratnam, Rajeevan; Mann, Peggy; Hoyne, Jonathan B

    2018-03-21

    Severe weather events such as hurricanes have the potential to cause significant disruption of laboratory operations. Comprehensive planning is essential to mitigate the impact of such events. The essential elements of a Hurricane Plan, based on our personal experiences, are detailed in this article.

  12. 33 CFR 332.4 - Planning and documentation.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... control invasive plant species; the proposed grading plan, including elevations and slopes of the substrate; soil management; and erosion control measures. For stream compensatory mitigation projects, the... standards and if adaptive management is needed. A schedule for monitoring and reporting on monitoring...

  13. 33 CFR 332.4 - Planning and documentation.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... control invasive plant species; the proposed grading plan, including elevations and slopes of the substrate; soil management; and erosion control measures. For stream compensatory mitigation projects, the... standards and if adaptive management is needed. A schedule for monitoring and reporting on monitoring...

  14. 33 CFR 332.4 - Planning and documentation.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... control invasive plant species; the proposed grading plan, including elevations and slopes of the substrate; soil management; and erosion control measures. For stream compensatory mitigation projects, the... standards and if adaptive management is needed. A schedule for monitoring and reporting on monitoring...

  15. 33 CFR 332.4 - Planning and documentation.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... control invasive plant species; the proposed grading plan, including elevations and slopes of the substrate; soil management; and erosion control measures. For stream compensatory mitigation projects, the... standards and if adaptive management is needed. A schedule for monitoring and reporting on monitoring...

  16. The advantage of calculating emission reduction with local emission factor in South Sumatera region

    NASA Astrophysics Data System (ADS)

    Buchari, Erika

    2017-11-01

    Green House Gases (GHG) which have different Global Warming Potential, usually expressed in CO2 equivalent. German has succeeded in emission reduction of CO2 in year 1990s, while Japan since 2001 increased load factor of public transports. Indonesia National Medium Term Development Plan, 2015-2019, has set up the target of minimum 26% and maximum 41% National Emission Reduction in 2019. Intergovernmental Panel on Climate Change (IPCC), defined three types of accuracy in counting emission of GHG, as tier 1, tier 2, and tier 3. In tier 1, calculation is based on fuel used and average emission (default), which is obtained from statistical data. While in tier 2, calculation is based fuel used and local emission factors. Tier 3 is more accurate from those in tier 1 and 2, and the calculation is based on fuel used from modelling method or from direct measurement. This paper is aimed to evaluate the calculation with tier 2 and tier 3 in South Sumatera region. In 2012, Regional Action Plan for Greenhouse Gases of South Sumatera for 2020 is about 6,569,000 ton per year and with tier 3 is about without mitigation and 6,229,858.468 ton per year. It was found that the calculation in tier 3 is more accurate in terms of fuel used of variation vehicles so that the actions of mitigation can be planned more realistically.

  17. Anthropogenic impact on flood-risk: a large-scale assessment for planning controlled inundation strategies along the River Po

    NASA Astrophysics Data System (ADS)

    Domeneghetti, Alessio; Castellarin, Attilio; Brath, Armando

    2013-04-01

    The European Flood Directive (2007/60/EC) has fostered the development of innovative and sustainable approaches and methodologies for flood-risk mitigation and management. Furthermore, concerning flood-risk mitigation, the increasing awareness of how the anthropogenic pressures (e.g. demographic and land-use dynamics, uncontrolled urban and industrial expansion on flood-prone area) could strongly increase potential flood damages and losses has triggered a paradigm shift from "defending the territory against flooding" (e.g. by means of levee system strengthening and heightening) to "living with floods" (e.g. promoting compatible land-uses or adopting controlled flooding strategies of areas located outside the main embankments). The assessment of how socio-economic dynamics may influence flood-risk represents a fundamental skill that should be considered for planning a sustainable industrial and urban development of flood-prone areas, reducing their vulnerability and therefore minimizing socio-economic and ecological losses due to large flood events. These aspects, which are of fundamental importance for Institutions and public bodies in charge of Flood Directive requirements, need to be considered through a holistic approach at river basin scale. This study focuses on the evaluation of large-scale flood-risk mitigation strategies for the middle-lower reach of River Po (~350km), the longest Italian river and the largest in terms of streamflow. Due to the social and economical importance of the Po River floodplain (almost 40% of the total national gross product results from this area), our study aims at investigating the potential of combining simplified vulnerability indices with a quasi-2D model for the definition of sustainable and robust flood-risk mitigation strategies. Referring to past (1954) and recent (2006) land-use data sets (e.g. CORINE) we propose simplified vulnerability indices for assessing potential flood-risk of industrial and urbanized flood prone areas taking into account altimetry and population density, and we analyze the modification of flood-risk occurred during last decades due to the demographic dynamics of the River Po floodplains. Flood hazard associated to a high magnitude event (i.e. return period of about 500 year) was estimated by means of a quasi-2D hydraulic model set up for the middle-lower portion of the Po River and for its major tributaries. The results of the study highlight how coupling a large-scale numerical model with the proposed flood-vulnerability indices could be a useful tool for decision-makers when they are called to define sustainable spatial development plans for the study area, or when they need to identify priorities in the organization of civil protection actions during a major flood event that could include the necessity of controlled flooding of flood-prone areas located outside the main embankment system.

  18. Nurse manager succession planning: A cost-benefit analysis.

    PubMed

    Phillips, Tracy; Evans, Jennifer L; Tooley, Stephanie; Shirey, Maria R

    2018-03-01

    This commentary presents a cost-benefit analysis to advocate for the use of succession planning to mitigate the problems ensuing from nurse manager turnover. An estimated 75% of nurse managers will leave the workforce by 2020. Many benefits are associated with proactively identifying and developing internal candidates. Fewer than 7% of health care organisations have implemented formal leadership succession planning programmes. A cost-benefit analysis of a formal succession-planning programme from one hospital illustrates the benefits of the programme in their organisation and can be replicated easily. Assumptions of nursing manager succession planning cost-benefit analysis are identified and discussed. The succession planning exemplar demonstrates the integration of cost-benefit analysis principles. Comparing the costs of a formal nurse manager succession planning strategy with the status quo results in a positive cost-benefit ratio. The implementation of a formal nurse manager succession planning programme effectively reduces replacement costs and time to transition into the new role. This programme provides an internal pipeline of future leaders who will be more successful than external candidates. Using an actual cost-benefit analysis equips nurse managers with valuable evidence depicting succession planning as a viable business strategy. © 2017 John Wiley & Sons Ltd.

  19. Wildfire Mitigation and Private Lands: Managing Long-Term Vulnerabilities

    Treesearch

    Brian Muller; Stacey Schulte

    2006-01-01

    Long-term management of wildfire vulnerability requires strategies that address complex interactions between fire ecology and human settlement. In this paper, we examine the integration of wildfire mitigation and land use planning in county governments in the western U.S. This research relies on data from two sources. First, we conducted a survey of land use...

  20. Polishing the prism: improving wildfire mitigation planning by coupling landscape and social dimensions

    Treesearch

    Geoffrey Koch; Alan Ager; Jeff Kline; Paige Fischer

    2016-01-01

    Effectively addressing wildfire risk to communities on large multi-owner landscapes requires an understanding of the biophysical factors that influence risk, such as fuel loads, topography, and weather, and social factors such as the capacity and willingness for communities to engage in fire-mitigation activities. Biophysical and social processes often are disconnected...

  1. Implementation of equity in resource allocation for regional earthquake risk mitigation using two-stage stochastic programming.

    PubMed

    Zolfaghari, Mohammad R; Peyghaleh, Elnaz

    2015-03-01

    This article presents a new methodology to implement the concept of equity in regional earthquake risk mitigation programs using an optimization framework. It presents a framework that could be used by decisionmakers (government and authorities) to structure budget allocation strategy toward different seismic risk mitigation measures, i.e., structural retrofitting for different building structural types in different locations and planning horizons. A two-stage stochastic model is developed here to seek optimal mitigation measures based on minimizing mitigation expenditures, reconstruction expenditures, and especially large losses in highly seismically active countries. To consider fairness in the distribution of financial resources among different groups of people, the equity concept is incorporated using constraints in model formulation. These constraints limit inequity to the user-defined level to achieve the equity-efficiency tradeoff in the decision-making process. To present practical application of the proposed model, it is applied to a pilot area in Tehran, the capital city of Iran. Building stocks, structural vulnerability functions, and regional seismic hazard characteristics are incorporated to compile a probabilistic seismic risk model for the pilot area. Results illustrate the variation of mitigation expenditures by location and structural type for buildings. These expenditures are sensitive to the amount of available budget and equity consideration for the constant risk aversion. Most significantly, equity is more easily achieved if the budget is unlimited. Conversely, increasing equity where the budget is limited decreases the efficiency. The risk-return tradeoff, equity-reconstruction expenditures tradeoff, and variation of per-capita expected earthquake loss in different income classes are also presented. © 2015 Society for Risk Analysis.

  2. An attempt to implement tools to support examination of community-based activities for disaster mitigation: A case study in Toyokawa city, Japan

    NASA Astrophysics Data System (ADS)

    Karashima, Kazuki; Ohgai, Akira

    2017-10-01

    Japan is a country with a high risk for earthquake disasters. The measures used to promote structures' seismic safety, such as reconstruction, widening narrow roads, and the response capacities to deal with huge earthquakes are important. Techniques to support the examination of countermeasures to huge earthquakes are required. To improve this capability, the authors developed tools to: (1) evaluate fire-spread risk, (2) evaluate the difficulty of emergency response and evacuation, and (3) evaluate capacities of neighborhood communities for disaster mitigation. The usefulness of the tools was clarified by the demonstration experiments of previous studies. The next step was implementation of the tools in community-based activities for disaster mitigation. This study aimed to clarify the usability and problems of implementing the tools in community-based activities. The tools were used at several workshops in actual community-based activities for disaster mitigation for one year. After the last workshop, interviews and a questionnaire were conducted on municipal staff and consultant staff. The results found that the tools visually showed the fire-spread risk, the difficulty of evacuation under current conditions and after improvements, and the effects of each disaster mitigation activity. The users could easily explore the draft plans to promote seismic safety of urban structures and response capabilities. The tools were positively incorporated into some community-based activities for disaster mitigation. Thus, the tools have the possibility of successful use at continuing community-based activities and the possibility of implementing the tools will be promoted.

  3. Integrating ecosystem services analysis into scenario planning practice: accounting for street tree benefits with i-Tree valuation in Central Texas.

    PubMed

    Hilde, Thomas; Paterson, Robert

    2014-12-15

    Scenario planning continues to gain momentum in the United States as an effective process for building consensus on long-range community plans and creating regional visions for the future. However, efforts to integrate more sophisticated information into the analytical framework to help identify important ecosystem services have lagged in practice. This is problematic because understanding the tradeoffs of land consumption patterns on ecological integrity is central to mitigating the environmental degradation caused by land use change and new development. In this paper we describe how an ecosystem services valuation model, i-Tree, was integrated into a mainstream scenario planning software tool, Envision Tomorrow, to assess the benefits of public street trees for alternative future development scenarios. The tool is then applied to development scenarios from the City of Hutto, TX, a Central Texas Sustainable Places Project demonstration community. The integrated tool represents a methodological improvement for scenario planning practice, offers a way to incorporate ecosystem services analysis into mainstream planning processes, and serves as an example of how open source software tools can expand the range of issues available for community and regional planning consideration, even in cases where community resources are limited. The tool also offers room for future improvements; feasible options include canopy analysis of various future land use typologies, as well as a generalized street tree model for broader U.S. application. Copyright © 2014 Elsevier Ltd. All rights reserved.

  4. Benefits and Challenges of Linking Green Infrastructure and Highway Planning in the United States

    NASA Astrophysics Data System (ADS)

    Marcucci, Daniel J.; Jordan, Lauren M.

    2013-01-01

    Landscape-level green infrastructure creates a network of natural and semi-natural areas that protects and enhances ecosystem services, regenerative capacities, and ecological dynamism over long timeframes. It can also enhance quality of life and certain economic activity. Highways create a network for moving goods and services efficiently, enabling commerce, and improving mobility. A fundamentally profound conflict exists between transportation planning and green infrastructure planning because they both seek to create connected, functioning networks across the same landscapes and regions, but transportation networks, especially in the form of highways, fragment and disconnect green infrastructure networks. A key opportunity has emerged in the United States during the last ten years with the promotion of measures to link transportation and environmental concerns. In this article we examined the potential benefits and challenges of linking landscape-level green infrastructure planning and implementation with integrated transportation planning and highway project development in the United States policy context. This was done by establishing a conceptual model that identified logical flow lines from planning to implementation as well as the potential interconnectors between green infrastructure and highway infrastructure. We analyzed the relationship of these activities through literature review, policy analysis, and a case study of a suburban Maryland, USA landscape. We found that regionally developed and adopted green infrastructure plans can be instrumental in creating more responsive regional transportation plans and streamlining the project environmental review process while enabling better outcomes by enabling more targeted mitigation. In order for benefits to occur, however, landscape-scale green infrastructure assessments and plans must be in place before integrated transportation planning and highway project development occurs. It is in the transportation community's interests to actively facilitate green infrastructure planning because it creates a more predictable environmental review context. On the other hand, for landscape-level green infrastructure, transportation planning and development is much more established and better funded and can provide a means of supporting green infrastructure planning and implementation, thereby enhancing conservation of ecological function.

  5. Benefits and challenges of linking green infrastructure and highway planning in the United States.

    PubMed

    Marcucci, Daniel J; Jordan, Lauren M

    2013-01-01

    Landscape-level green infrastructure creates a network of natural and semi-natural areas that protects and enhances ecosystem services, regenerative capacities, and ecological dynamism over long timeframes. It can also enhance quality of life and certain economic activity. Highways create a network for moving goods and services efficiently, enabling commerce, and improving mobility. A fundamentally profound conflict exists between transportation planning and green infrastructure planning because they both seek to create connected, functioning networks across the same landscapes and regions, but transportation networks, especially in the form of highways, fragment and disconnect green infrastructure networks. A key opportunity has emerged in the United States during the last ten years with the promotion of measures to link transportation and environmental concerns. In this article we examined the potential benefits and challenges of linking landscape-level green infrastructure planning and implementation with integrated transportation planning and highway project development in the United States policy context. This was done by establishing a conceptual model that identified logical flow lines from planning to implementation as well as the potential interconnectors between green infrastructure and highway infrastructure. We analyzed the relationship of these activities through literature review, policy analysis, and a case study of a suburban Maryland, USA landscape. We found that regionally developed and adopted green infrastructure plans can be instrumental in creating more responsive regional transportation plans and streamlining the project environmental review process while enabling better outcomes by enabling more targeted mitigation. In order for benefits to occur, however, landscape-scale green infrastructure assessments and plans must be in place before integrated transportation planning and highway project development occurs. It is in the transportation community's interests to actively facilitate green infrastructure planning because it creates a more predictable environmental review context. On the other hand, for landscape-level green infrastructure, transportation planning and development is much more established and better funded and can provide a means of supporting green infrastructure planning and implementation, thereby enhancing conservation of ecological function.

  6. 76 FR 41810 - Francis Proposed Low-Effect Habitat Conservation Plan for the Morro Shoulderband Snail, Los Osos...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-15

    ...] Francis Proposed Low-Effect Habitat Conservation Plan for the Morro Shoulderband Snail, Los Osos, San Luis... conservation program to minimize and mitigate project activities as described in their low-effect habitat conservation plan. We invite comments from the public on the application, which includes the Francis Low-Effect...

  7. A Federal Plan for Natural Disaster Warning and Preparedness, Federal Committee for Meteorological Services and Supporting Research.

    ERIC Educational Resources Information Center

    National Oceanic and Atmospheric Administration (DOC), Rockville, MD.

    This plan to mitigate the impact of potential geophysical natural disasters, including those caused by hurricanes, tornadoes, floods and earthquakes, integrates and coordinates the multiagency functions in warning services and community preparedness related to many of these disasters. The plan is divided into five sections. The first two sections…

  8. An Analysis of Adverse Events in the Rehabilitation Department: Using the Veterans Affairs Root Cause Analysis System.

    PubMed

    Hagley, Gregory W; Mills, Peter D; Shiner, Brian; Hemphill, Robin R

    2018-04-01

    Root cause analyses (RCA) are often completed in health care settings to determine causes of adverse events (AEs). RCAs result in action plans designed to mitigate future patient harm. National reviews of RCA reports have assessed the safety of numerous health care settings and suggested opportunities for improvement. However, few studies have assessed the safety of receiving care from physical therapists, occupational therapists, or speech and language pathology pathologists. The objective of this study was to determine the types of AEs, root causes, and action plans for risk mitigation that exist within the disciplines of rehabilitation medicine. This study is a retrospective, cross-sectional review. A national search of the Veterans Health Administration RCA database was conducted to identify reports describing AEs associated with physical therapy, occupational therapy, or speech and language pathology services between 2009 and May 2016. Twenty-five reports met the inclusion requirements. The reports were classified by the event type, root cause, action plans, and strength of action plans. Delays in care (32.0%) and falls (28.0%) were the most common type of AE. Three AEs resulted in death. RCA teams identified deficits regarding policy and procedures as the most common root cause. Eighty-eight percent of RCA reports included strong or intermediate action plans to mitigate risk. Strong action plans included standardizing emergency terminology and implementing a dedicated line to call for an emergency response. These data are self-reported and only AEs that are scored as a safety assessment code 3 in the system receive a full RCA, so there are likely AEs that were not captured in this study. In addition, the RCA reports are deidentified and so do not include all patient characteristics. As the Veterans Health Administration system services mostly men, the data might not generalize to non-Veterans Health Administration systems with a different patient mix. Care provided by rehabilitation professionals is generally safe, but AEs do occur. Based on this RCA review, the safety of rehabilitation services can be improved by implementing strong practices to mitigate risk to patients. Checklists should be considered to aid timely decision making when initiating an emergency response.

  9. Developing a Framework to Link Catchment Modelling tools to Decision Support Systems for Catchment Management and Planning

    NASA Astrophysics Data System (ADS)

    Adams, Russell; Owen, Gareth

    2015-04-01

    Over the past few years a series of catchment monitoring studies in the UK have developed a wide range of tools to enable managers and planners to make informed decisions to target several key outcomes. These outcomes include the mitigation of diffuse pollution and the reduction of flood risk. Good progress has been but additional steps are still required to link together more detailed models that represent catchment processes with the decision support systems (often termed matrices; i.e. DSMs) which form the basis of these planning and management tools. Examples include: (i) the FARM tools developed by the PROACTIVE team at Newcastle University to assess different catchment management options for mitigating against flooding events, (ii) TOPMANAGE, a suite of algorithms that link with high resolution DEMs to enable surface flow pathways, having the potential to be mitigated by Natural Flood Management (NFM) features (in order to target diffuse pollution due to nutrients and sediments) to be identified. To date, these DSMs have not been underpinned by models that can be run in real-time to quantify the benefits in terms of measurable reductions in flood or nutrient pollution risks. Their use has therefore been mostly as qualitative assessment tools. This study aims to adapt an existing spreadsheet-based model, the CRAFT, in order for it to become fully coupled to a DSM approach. Previous catchment scale applications of the CRAFT have focussed on meso-scale studies where any management interventions at a local scale are unlikely to be detectable at the monitoring point (the catchment outlet). The model has however been reasonably successful in identifying potential flow and transport pathways that link the headwater subcatchments to the outlet. Furthermore, recent enhancements to the model enable features such as sedimentation ponds and lagoons that can trap and remove nutrients and sediments to be added, once data become available from different types of NFM features to parameterise these. The model can be used to investigate runoff attenuation (in this case primarily through a lagged routing term applied to surface runoff) as a result of implementing mitigation measures. However to be fully integrated within a DSM framework requires the CRAFT to be linked to a user-friendly interface that will allow the user to modify key parameters, preferably using a web-based expert system, which will be explored further.

  10. Evaluation of the varying Naturally Occurring Asbestos mitigation measures at School and Commercial construction projects in California

    NASA Astrophysics Data System (ADS)

    Kalika, S.

    2012-12-01

    In commercial development or K-12 school construction, project sites are often purchased and much of the planning process completed prior to an assessment of the soils proposed for excavation or potential offhaul. Geologic maps, while initially helpful for identifying potential hazards such as landslides and earthquake faults, are less helpful in the identification of naturally occurring hazardous minerals, such as the seven regulated minerals currently classified as asbestos. Geologic maps identify mafic and ultramafic bedrock zones; however, a skilled geologist with knowledge of asbestos hazards will further visualize the earth-shaping processes that may have resulted in the deposition of naturally occurring asbestos in locations outside mapped ultramafic zones including the base of an alluvial fan or within streambed channels. When sampled as an afterthought prior to disposal, property owners are surprised by the budget-crippling costs of waste handling and disposal of NOA, as well as mitigations required to protect the health of construction workers, the public, and future site occupants. The California Air Resources Board (CARB) continues to lead the way in evaluation and regulation of NOA, through development of the CARB 435 preparation and laboratory analytical method, local enforcement of the Asbestos Airborne Toxic Control Measure for Construction, Grading, Quarrying, and Surface Mining Operations (ATCM), and implementation of dust control measures to protect public health. A thorough site evaluation and construction design includes utilization of the sampling methods developed by the California Geological Survey, laboratory analytical methods within CARB 435, and mitigation measures required by CARB, DTSC, and OSHA for the protection of worker and public health after NOA is discovered. The site evaluation should additionally include an assessment of the future site usage, as regulations differ based on potential health affects to future occupants. Construction and long-term monitoring at an elementary school differs in regulatory requirements from construction of a commercial property. This presentation will highlight two case studies: a school project with several years of advance planning versus a commercial property where NOA was discovered weeks before the start of construction. The presentation will analyze the regulatory differences, mitigation measures, and consideration of the financial impacts that the discovery of NOA can have on a school versus a commercial project.

  11. Proceedings of the Second NASA Aviation Safety Program Weather Accident Prevention Review

    NASA Technical Reports Server (NTRS)

    Martzaklis, K. Gus (Compiler)

    2003-01-01

    The Second NASA Aviation Safety Program (AvSP) Weather Accident Prevention (WxAP) Annual Project Review held June 5-7, 2001, in Cleveland, Ohio, presented the NASA technical plans and accomplishments to the aviation community. NASA-developed technologies presented included an Aviation Weather Information System with associated digital communications links, electronic atmospheric reporting technologies, forward-looking turbulence warning systems, and turbulence mitigation procedures. The meeting provided feedback and insight from the aviation community of diverse backgrounds and assisted NASA in steering its plans in the direction needed to meet the national safety goal of 80-percent reduction of aircraft accidents by 2007. The proceedings of the review are enclosed.

  12. Integrated Cost and Schedule using Monte Carlo Simulation of a CPM Model - 12419

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hulett, David T.; Nosbisch, Michael R.

    This discussion of the recommended practice (RP) 57R-09 of AACE International defines the integrated analysis of schedule and cost risk to estimate the appropriate level of cost and schedule contingency reserve on projects. The main contribution of this RP is to include the impact of schedule risk on cost risk and hence on the need for cost contingency reserves. Additional benefits include the prioritizing of the risks to cost, some of which are risks to schedule, so that risk mitigation may be conducted in a cost-effective way, scatter diagrams of time-cost pairs for developing joint targets of time and cost,more » and probabilistic cash flow which shows cash flow at different levels of certainty. Integrating cost and schedule risk into one analysis based on the project schedule loaded with costed resources from the cost estimate provides both: (1) more accurate cost estimates than if the schedule risk were ignored or incorporated only partially, and (2) illustrates the importance of schedule risk to cost risk when the durations of activities using labor-type (time-dependent) resources are risky. Many activities such as detailed engineering, construction or software development are mainly conducted by people who need to be paid even if their work takes longer than scheduled. Level-of-effort resources, such as the project management team, are extreme examples of time-dependent resources, since if the project duration exceeds its planned duration the cost of these resources will increase over their budgeted amount. The integrated cost-schedule risk analysis is based on: - A high quality CPM schedule with logic tight enough so that it will provide the correct dates and critical paths during simulation automatically without manual intervention. - A contingency-free estimate of project costs that is loaded on the activities of the schedule. - Resolves inconsistencies between cost estimate and schedule that often creep into those documents as project execution proceeds. - Good-quality risk data that are usually collected in risk interviews of the project team, management and others knowledgeable in the risk of the project. The risks from the risk register are used as the basis of the risk data in the risk driver method. The risk driver method is based in the fundamental principle that identifiable risks drive overall cost and schedule risk. - A Monte Carlo simulation software program that can simulate schedule risk, burn WM2012 rate risk and time-independent resource risk. The results include the standard histograms and cumulative distributions of possible cost and time results for the project. However, by simulating both cost and time simultaneously we can collect the cost-time pairs of results and hence show the scatter diagram ('football chart') that indicates the joint probability of finishing on time and on budget. Also, we can derive the probabilistic cash flow for comparison with the time-phased project budget. Finally the risks to schedule completion and to cost can be prioritized, say at the P-80 level of confidence, to help focus the risk mitigation efforts. If the cost and schedule estimates including contingency reserves are not acceptable to the project stakeholders the project team should conduct risk mitigation workshops and studies, deciding which risk mitigation actions to take, and re-run the Monte Carlo simulation to determine the possible improvement to the project's objectives. Finally, it is recommended that the contingency reserves of cost and of time, calculated at a level that represents an acceptable degree of certainty and uncertainty for the project stakeholders, be added as a resource-loaded activity to the project schedule for strategic planning purposes. The risk analysis described in this paper is correct only for the current plan, represented by the schedule. The project contingency reserve of time and cost that are the main results of this analysis apply if that plan is to be followed. Of course project managers have the option of re-planning and re-scheduling in the face of new facts, in part by mitigating risk. This analysis identifies the high-priority risks to cost and to schedule, which assist the project manager in planning further risk mitigation. Some project managers reject the results and argue that they cannot possibly be so late or so overrun. Those project managers may be wasting an opportunity to mitigate risk and get a more favorable outcome. (authors)« less

  13. Risk and the neoliberal state: why post-Mitch lessons didn't reduce El Salvador's earthquake losses.

    PubMed

    Wisner, B

    2001-09-01

    Although El Salvador suffered light losses from Hurricane Mitch in 1998, it benefited from the increased international aid and encouragement for advance planning, especially mitigation and prevention interventions. Thus, one would have supposed, El Salvador would have been in a very advantageous position, able more easily than its economically crippled neighbours, Honduras and Nicaragua, to implement the 'lessons of Mitch'. A review of the recovery plan tabled by the El Salvador government following the earthquakes of early 2001 shows that despite the rhetoric in favour of 'learning the lessons of Mitch', very little mitigation and prevention had actually been put in place between the hurricane (1998) and the earthquakes (2001). The recovery plan is analysed in terms of the degree to which it deals with root causes of disaster vulnerability, namely, the economic and political marginality of much of the population and environmental degradation. An explanation for the failure to implement mitigation and preventive actions is traced to the adherence by the government of El Salvador to an extreme form of neoliberal, free market ideology, and the deep fissures and mistrust in a country that follow a long and bloody civil war.

  14. Successes and Challenges in Implementation of Radon Control Activities in Iowa, 2010-2015.

    PubMed

    Bain, Allison A; Abbott, Anne L; Miller, Laura L

    2016-04-14

    Radon gas has recently become more prominent in discussions of lung cancer prevention nationally and in Iowa. A review in 2013 of cancer plans in the National Comprehensive Cancer Control Program found that 42% of cancer plans, including Iowa's, had terminology on radon. Plans included awareness activities, home testing, remediation, policy, and policy evaluation. Iowa has the highest average radon concentrations in the United States; 70% of homes have radon concentrations above the Environmental Protection Agency's action levels. Radon control activities in Iowa are led by the Iowa Cancer Consortium, the Iowa Department of Public Health, and the Iowa Radon Coalition. A collaborative approach was used to increase levels of awareness, testing, and (if necessary) mitigation, and to introduce a comprehensive radon control policy in Iowa by engaging partners and stakeholders across the state. The multipronged approach and collaborative work in Iowa appears to have been successful in increasing awareness: the number of radon tests completed in Iowa increased by 20% from 19,600 in 2009 to 23,500 in 2014, and the number of mitigations completed by certified mitigators increased by 108% from 2,600 to more than 5,400. Through collaboration, Iowa communities are engaged in activities that led to increases in awareness, testing, mitigation, and policy. States interested in establishing a similar program should consider a multipronged approach involving multiple entities and stakeholders with different interests and abilities. Improvements in data collection and analysis are necessary to assess impact.

  15. Mitigation planning for raptors during mining

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Platt, S.W.; Hargis, N.E.

    1990-12-31

    Birds of prey and their eggs, young and nests are protected by state and federal laws and regulations. Surface mining operators may experience conflicts with raptors when expanding into nesting areas or when raptors are attracted into mining areas. State and federal permits are required for disturbance or manipulation of birds of prey. Mitigation planning for raptors begins before mining and continues through mining. As conflict situations changes, so must the mitigation plan. Before each nesting season the mining schedule should be compared to areas of known raptor nesting activity. If overlap occurs, nest protection measures may be needed. Areasmore » of potential conflict should be patrolled regularly to identify the presence of a raptor pair and nest starts. Should a raptor nest be built and eggs laid, a change in the mining schedule or an egg or brood manipulation may resolve the conflict. Bridger Coal Company has successfully mitigated conflicts with 3 raptor species. A ferruginous hawk (Buteo regalis) nest with brood was successfully relocated across a pit. Red-tailed hawk (B. jamaicensis) egg clutches were removed from 2 highwall nests and transported in a portable incubator to a commercial raptor propagator where they were hatched, fed and conspecifically imprinted until achieving self-thermoregulation. All chicks were returned to the mine and successfully placed into foster nests. A metal artificial nest ledge for a prairie falcon (Falco mexicanus) was constructed in a cliff and a traditional nesting ledge rendered inaccessible. The falcon pair successfully nested in the artificial ledge.« less

  16. Mitigation of Syngas Cooler Plugging and Fouling

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bockelie, Michael J.

    This Final Report summarizes research performed to develop a technology to mitigate the plugging and fouling that occurs in the syngas cooler used in many Integrated Gasification Combined Cycle (IGCC) plants. The syngas cooler is a firetube heat exchanger located downstream of the gasifier. It offers high thermal efficiency, but its’ reliability has generally been lower than other process equipment in the gasification island. The buildup of ash deposits that form on the fireside surfaces in the syngas cooler (i.e., fouling) lead to reduced equipment life and increased maintenance costs. Our approach to address this problem is that fouling ofmore » the syngas cooler cannot be eliminated, but it can be better managed. The research program was funded by DOE using two budget periods: Budget Period 1 (BP1) and Budget Period 2 (BP2). The project used a combination of laboratory scale experiments, analysis of syngas cooler deposits, modeling and guidance from industry to develop a better understanding of fouling mechanisms and to develop and evaluate strategies to mitigate syngas cooler fouling and thereby improve syngas cooler performance. The work effort in BP 1 and BP 2 focused on developing a better understanding of the mechanisms that lead to syngas cooler plugging and fouling and investigating promising concepts to mitigate syngas cooler plugging and fouling. The work effort focused on the following: • analysis of syngas cooler deposits and fuels provided by an IGCC plant collaborating with this project; • performing Jet cleaning tests in the University of Utah Laminar Entrained Flow Reactor to determine the bond strength between an ash deposit to a metal plate, as well as implementing planned equipment modifications to the University of Utah Laminar Entrained Flow Reactor and the one ton per day, pressurized Pilot Scale Gasifier; • performing Computational Fluid Dynamic modeling of industrially relevant syngas cooler configurations to develop a better understanding of deposit formation mechanisms; • performing Techno-Economic-Analysis for a representative IGCC plant to investigate the impact on plant economics, in particular the impacts on the Cost of Electricity (COE), due to plant shutdowns caused by syngas cooler plugging and fouling and potential benefits to plant economics of developing strategies to mitigate syngas cooler fouling; and • performing modeling and pilot scale tests to investigate the potential benefits of using a sorbent (fuel additive) to capture the vaporized metals that result in syngas cooler fouling. All project milestones for BP 1 and BP 2 were achieved. DOE was provided a briefing on our accomplishments in BP1 and BP2 and our proposed plans for Budget Period 3 (BP 3). Based on our research the mitigation technology selected to investigate in BP 3 was the use of a sorbent that can be injected into the gasifier with the fuel slurry to capture vaporized metals that lead to the deposit formation in the syngas cooler. The work effort proposed for BP 3 would have focused on addressing concerns raised by gasification industry personnel for the impacts on gasifier performance of sorbent injection, so that at the end of BP 3 the use of sorbent injection would be at “pre-commercial” stage and ready for use in a Field Demonstration that could be funded by industry or DOE. A Budget Continuation Application (BCA) was submitted to obtain funding for BP3 DOE but DOE chose to not fund the proposed BP3 effort.« less

  17. Active Control of Cryogenic Propellants in Space

    NASA Technical Reports Server (NTRS)

    Notardonato, William

    2011-01-01

    A new era of space exploration is being planned. Exploration architectures under consideration require the long term storage of cryogenic propellants in space. This requires development of active control systems to mitigate the effect of heat leak. This work summarizes current state of the art, proposes operational design strategies and presents options for future architectures. Scaling and integration of active systems will be estimated. Ideal long range spacecraft systems will be proposed with Exploration architecture benefits considered.

  18. Toward Identifying Needed Investments in Modeling and Simulation Tools for NEO Deflection Planning

    NASA Technical Reports Server (NTRS)

    Adams, Robert B.

    2009-01-01

    Its time: a) To bring planetary scientists, deflection system investigators and vehicle designers together on the characterization/mitigation problem. b) To develop a comprehensive trade space of options. c) To trade options under a common set of assumptions and see what comparisons on effectiveness can be made. d) To explore the synergy that can be had with proposed scientific and exploration architectures while interest in NEO's are at an all time high.

  19. Does Wildfire Open a Policy Window? Local Government and Community Adaptation After Fire in the United States.

    PubMed

    Mockrin, Miranda H; Fishler, Hillary K; Stewart, Susan I

    2018-05-15

    Becoming a fire adapted community that can coexist with wildfire is envisioned as a continuous, iterative process of adaptation, but it is unclear how communities may pursue adaptation. Experience with wildfire and other natural hazards suggests that disasters may open a "window of opportunity" leading to local government policy changes. We examined how destructive wildfire affected progress toward becoming fire adapted in eight locations in the United States. We found that community-level adaptation following destructive fires is most common where destructive wildfire is novel and there is already government capacity and investment in wildfire regulation and land use planning. External funding, staff capacity, and the presence of issue champions combined to bring about change after wildfire. Locations with long histories of destructive wildfire, extensive previous investment in formal wildfire regulation and mitigation, or little government and community capacity to manage wildfire saw fewer changes. Across diverse settings, communities consistently used the most common tools and actions for wildfire mitigation and planning. Nearly all sites reported changes in wildfire suppression, emergency response, and hazard planning documents. Expansion in voluntary education and outreach programs to increase defensible space was also common, occurring in half of our sites, but land use planning and regulations remained largely unchanged. Adaptation at the community and local governmental level therefore may not axiomatically follow from each wildfire incident, nor easily incorporate formal approaches to minimizing land use and development in hazardous environments, but in many sites wildfire was a focusing event that inspired reflection and adaptation.

  20. Population growth is a variable open to change

    NASA Astrophysics Data System (ADS)

    Potts, M.

    2016-12-01

    The absolute number of people and the rate of population growth have an impact on climate mitigation, adaptation and possible conflict. Half the pregnancies in the US are unintended. Robust quantitative evidence from California demonstrates that improving access to family planning is the single most cost-effective way of mitigating our carbon footprint. Globally, there are 80 million unintended pregnancies annually. Many non-evidence barriers deprive women of the information and means required to separate sex from childbearing. Between 1960 and 1990, meeting the need for family planning led to a rapid fall in family size in much of Asia. Since 1990, funding for family planning has collapsed and fertility decline has stalled. The UN projects that by 2100 global population will increase by 3.8 billion (equal to world population in 1975). 80% of this growth will be in Africa. Studies project that climate change will undermine crop yields in parts of Africa, especially the Sahel. A high ratio of young males to the rest of the population is a risk factor in conflict. Today, only 1% of overseas assistance is allocated to family planning. Based on analysis of the past, doubling that investment would accelerate fertility decline, facilitating climate mitigation and adaptation, and possibly reducing conflict. Population and family planning were pushed off the international agenda by unacceptably and tragic episodes of coercion in China and India. However, there is compelling data that when voluntary family planning is widely available then family size can fall rapidly, as occurred in the Islamic Republic of Iran, where fertility fell more rapidly than in any other country in history. Family planning is listening to what women want not telling people want to do. Population growth is a variable open to change in a human rights framework. Population and family planning are variables relevant to the scientific agenda of the AGU.

  1. Reliability Demonstration Approach for Advanced Stirling Radioisotope Generator

    NASA Technical Reports Server (NTRS)

    Ha, CHuong; Zampino, Edward; Penswick, Barry; Spronz, Michael

    2010-01-01

    Developed for future space missions as a high-efficiency power system, the Advanced Stirling Radioisotope Generator (ASRG) has a design life requirement of 14 yr in space following a potential storage of 3 yr after fueling. In general, the demonstration of long-life dynamic systems remains difficult in part due to the perception that the wearout of moving parts cannot be minimized, and associated failures are unpredictable. This paper shows a combination of systematic analytical methods, extensive experience gained from technology development, and well-planned tests can be used to ensure a high level reliability of ASRG. With this approach, all potential risks from each life phase of the system are evaluated and the mitigation adequately addressed. This paper also provides a summary of important test results obtained to date for ASRG and the planned effort for system-level extended operation.

  2. Pervasive community care platform: Ambient Intelligence leveraging sensor networks and mobile agents

    NASA Astrophysics Data System (ADS)

    Su, Chuan-Jun; Chiang, Chang-Yu

    2014-04-01

    Several powerful trends are contributing to an aging of much of the world's population, especially in economically developed countries. To mitigate the negative effects of rapidly ageing populations, societies must act early to plan for the welfare, medical care and residential arrangements of their senior citizens, and for the manpower and associated training needed to execute these plans. This paper describes the development of an Ambient Intelligent Community Care Platform (AICCP), which creates an environment of Ambient Intelligence through the use of sensor network and mobile agent (MA) technologies. The AICCP allows caregivers to quickly and accurately locate their charges; access, update and share critical treatment and wellness data; and automatically archive all records. The AICCP presented in this paper is expected to enable caregivers and communities to offer pervasive, accurate and context-aware care services.

  3. What are check dams made for? An historical perspective from the French experience

    NASA Astrophysics Data System (ADS)

    Piton, Guillaume; Carladous, Simon; Recking, Alain

    2015-04-01

    The mitigation of torrent related hazards is an important issue in mountainous regions. Structural mitigation measures have been implemented on hill slopes and in streambeds for more than 150 years in all Europe. Check dams play a key role in these mitigation plans and can have highly variable functions (horizontal and vertical stabilization of streambeds, consolidation of hillslopes' toe, retention of sediments, modulations of high solid discharges, lowering of streambed slope, etc.). Thousands of structures had been built more than a century ago. Since their construction, land uses evolved, torrent control works, associated with reforestation, curtailed a part of the sediment production. According to field experience, defining the initial and current functions of some old structures can remain challenging in some cases. To better understand for which purposes thousands of these structures were built during the 19th and 20th centuries , we analyzed old books to determine: what was the history of the comprehension of the processes involved in torrent related hazards? and; how the use of check dams evolved to take into account this improving comprehension? i.e. how the human actions on watercourses co-evolved with scientific knowledge from the early 19th centuries to nowadays? The presentation does not aim to determine who, the first, addressed any scientific question: equivalent history and scientific works took place in all regions of the world at different time and the French were not the first to build check dams and to undertook watershed scale mitigation plans. But the French example is interesting because the torrent control works were planned in mountainous regions at the country scale (the Alps, the Pyrenees and the Massif Central). Initial plans were to reforest mountains, relying on civil engineering works if needed. Their implementation , through the French Mountain Lands' reforestation and grass seeding laws of 1860 and 1864, proved to be difficult for technical and sociological reasons. The Mountain lands' conservation and restoration law of 1882 aimed to better fit local issues. The idea of the presentation is thus to highlight how evolved the historical comprehension of torrential hazards and of the usefulness of check dams in mitigation plans in a changing environment on the technical as well as on the sociological and regulatory points of view. Pioneering scientific and technical works on torrential hydraulics and check dams will be presented. Describing the global context that leads to French laws of 1860,1864 and 1882 will allow us to explain the extensive development of the works in more than a thousand of torrents and a hundred of big landslides. We then will discuss the evolution of technics during the beginning of the 20th century and the changes induced after WWII by the arrival of reinforced-concrete technics. We will conclude the presentation with a synthesis table aiming to highlight the different functions of check dams based on a description of their situations in the watershed, compare to other structures' situations and on shape criteria. This historical perspective will hopefully help people to better understand for which purposes some structures have been built in the past centuries and what lessons can be learnt from this assessment.

  4. Probabilistic eruption forecasting at short and long time scales

    NASA Astrophysics Data System (ADS)

    Marzocchi, Warner; Bebbington, Mark S.

    2012-10-01

    Any effective volcanic risk mitigation strategy requires a scientific assessment of the future evolution of a volcanic system and its eruptive behavior. Some consider the onus should be on volcanologists to provide simple but emphatic deterministic forecasts. This traditional way of thinking, however, does not deal with the implications of inherent uncertainties, both aleatoric and epistemic, that are inevitably present in observations, monitoring data, and interpretation of any natural system. In contrast to deterministic predictions, probabilistic eruption forecasting attempts to quantify these inherent uncertainties utilizing all available information to the extent that it can be relied upon and is informative. As with many other natural hazards, probabilistic eruption forecasting is becoming established as the primary scientific basis for planning rational risk mitigation actions: at short-term (hours to weeks or months), it allows decision-makers to prioritize actions in a crisis; and at long-term (years to decades), it is the basic component for land use and emergency planning. Probabilistic eruption forecasting consists of estimating the probability of an eruption event and where it sits in a complex multidimensional time-space-magnitude framework. In this review, we discuss the key developments and features of models that have been used to address the problem.

  5. A robust simulation-optimization modeling system for effluent trading--a case study of nonpoint source pollution control.

    PubMed

    Zhang, J L; Li, Y P; Huang, G H

    2014-04-01

    In this study, a robust simulation-optimization modeling system (RSOMS) is developed for supporting agricultural nonpoint source (NPS) effluent trading planning. The RSOMS can enhance effluent trading through incorporation of a distributed simulation model and an optimization model within its framework. The modeling system not only can handle uncertainties expressed as probability density functions and interval values but also deal with the variability of the second-stage costs that are above the expected level as well as capture the notion of risk under high-variability situations. A case study is conducted for mitigating agricultural NPS pollution with an effluent trading program in Xiangxi watershed. Compared with non-trading policy, trading scheme can successfully mitigate agricultural NPS pollution with an increased system benefit. Through trading scheme, [213.7, 288.8] × 10(3) kg of TN and [11.8, 30.2] × 10(3) kg of TP emissions from cropped area can be cut down during the planning horizon. The results can help identify desired effluent trading schemes for water quality management with the tradeoff between the system benefit and reliability being balanced and risk aversion being considered.

  6. A decision-support tool for the control of urban noise pollution.

    PubMed

    Suriano, Marcia Thais; de Souza, Léa Cristina Lucas; da Silva, Antonio Nelson Rodrigues

    2015-07-01

    Improving the quality of life is increasingly seen as an important urban planning goal. In order to reach it, various tools are being developed to mitigate the negative impacts of human activities on society. This paper develops a methodology for quantifying the population's exposure to noise, by proposing a classification of urban blocks. Taking into account the vehicular flow and traffic composition of the surroundings of urban blocks, we generated a noise map by applying a computational simulation. The urban blocks were classified according to their noise range and then the population was estimated for each urban block, by a process which was based on the census tract and the constructed area of the blocks. The acoustical classes of urban blocks and the number of inhabitants per block were compared, so that the population exposed to noise levels above 65 dB(A) could be estimated, which is the highest limit established by legislation. As a result, we developed a map of the study area, so that urban blocks that should be priority targets for noise mitigation actions can be quickly identified.

  7. Is climate change modifying precipitation extremes?

    NASA Astrophysics Data System (ADS)

    Montanari, Alberto; Papalexiou, Simon Michael

    2016-04-01

    The title of the present contribution is a relevant question that is frequently posed to scientists, technicians and managers of local authorities. Although several research efforts were recently dedicated to rainfall observation, analysis and modelling, the above question remains essentially unanswered. The question comes from the awareness that the frequency of floods and the related socio-economic impacts are increasing in many countries, and climate change is deemed to be the main trigger. Indeed, identifying the real reasons for the observed increase of flood risk is necessary in order to plan effective mitigation and adaptation strategies. While mitigation of climate change is an extremely important issue at the global level, at small spatial scales several other triggers may interact with it, therefore requiring different mitigation strategies. Similarly, the responsibilities of administrators are radically different at local and global scales. This talk aims to provide insights and information to address the question expressed by its title. High resolution and long term rainfall data will be presented, as well as an analysis of the frequency of their extremes and its progress in time. The results will provide pragmatic indications for the sake of better planning flood risk mitigation policies.

  8. The Puerto Rico Component of the National Tsunami Hazard and Mitigation Program (PR-NTHMP)

    NASA Astrophysics Data System (ADS)

    Vanacore, E. A.; Huerfano Moreno, V. A.; Lopez, A. M.

    2015-12-01

    The Caribbean region has a documented history of damaging tsunamis that have affected coastal areas. Of particular interest is the Puerto Rico - Virgin Islands (PRVI) region, where the proximity of the coast to prominent tectonic faults would result in near-field tsunamis. Tsunami hazard assessment, detection capabilities, warning, education and outreach efforts are common tools intended to reduce loss of life and property. It is for these reasons that the PRSN is participating in an effort with local and federal agencies to develop tsunami hazard risk reduction strategies under the NTHMP. This grant supports the TsunamiReady program, which is the base of the tsunami preparedness and mitigation in PR. In order to recognize threatened communities in PR as TsunamiReady by the US NWS, the PR Component of the NTHMP have identified and modeled sources for local, regional and tele-tsunamis and the results of simulations have been used to develop tsunami response plans. The main goal of the PR-NTHMP is to strengthen resilient coastal communities that are prepared for tsunami hazards, and recognize PR as TsunamiReady. Evacuation maps were generated in three phases: First, hypothetical tsunami scenarios of potential underwater earthquakes were developed, and these scenarios were then modeled through during the second phase. The third phase consisted in determining the worst-case scenario based on the Maximum of Maximums (MOM). Inundation and evacuation zones were drawn on GIS referenced maps and aerial photographs. These products are being used by emergency managers to educate the public and develop mitigation strategies. Maps and related evacuation products, like evacuation times, can be accessed online via the PR Tsunami Decision Support Tool. Based on these evacuation maps, tsunami signs were installed, vulnerability profiles were created, communication systems to receive and disseminate tsunami messages were installed in each TWFP, and tsunami response plans were approved. Also, the existing tsunami protocol and criteria in the PR/VI was updated. This paper describes the PR-NTHMP recent outcomes, including the real time monitoring as well as the protocols used to broadcast tsunami messages. The paper highlights tsunami hazards assessment, detection, warning, education and outreach efforts in Puerto Rico.

  9. Implementing drought early warning systems: policy lessons and future needs

    NASA Astrophysics Data System (ADS)

    Iglesias, Ana; Werner, Micha; Maia, Rodrigo; Garrote, Luis; Nyabeze, Washington

    2014-05-01

    Drought forecasting and Warning provides the potential of reducing impacts to society due to drought events. The implementation of effective drought forecasting and warning, however, requires not only science to support reliable forecasting, but also adequate policy and societal response. Here we propose a protocol to develop drought forecasting and early warning based in the international cooperation of African and European institutions in the DEWFORA project (EC, 7th Framework Programme). The protocol includes four major phases that address the scientific knowledge and the social capacity to use the knowledge: (a) What is the science available? Evaluating how signs of impending drought can be detected and predicted, defining risk levels, and analysing of the signs of drought in an integrated vulnerability approach. (b) What are the societal capacities? In this the institutional framework that enables policy development is evaluated. The protocol gathers information on vulnerability and pending hazard in advance so that early warnings can be declared at sufficient lead time and drought mitigation planning can be implemented at an early stage. (c) How can science be translated into policy? Linking science indicators into the actions/interventions that society needs to implement, and evaluating how policy is implemented. Key limitations to planning for drought are the social capacities to implement early warning systems. Vulnerability assessment contributes to identify these limitations and therefore provides crucial information to policy development. Based on the assessment of vulnerability we suggest thresholds for management actions to respond to drought forecasts and link predictive indicators to relevant potential mitigation strategies. Vulnerability assessment is crucial to identify relief, coping and management responses that contribute to a more resilient society. (d) How can society benefit from the forecast? Evaluating how information is provided to potentially affected groups, and how mitigation strategies can be taken in response. This paper presents an outline of the protocol that was developed in the DEWFORA project, outlining the complementary roles of science, policy and societal uptake in effective drought forecasting and warning. A consensus on the need to emphasise the social component of early warning was reached when testing the DEWFORA early warning system protocol among experts from 18 countries.

  10. Forest communities and the Northwest Forest Plan: what socioeconomic monitoring can tell us.

    Treesearch

    Jonathan Thompson

    2007-01-01

    The Northwest Forest Plan (the Plan) was designed to balance protection of older forest ecosystems with mitigation of impacts on rural communities and economies. It was implemented by using an adaptive management approach that featured an interagency monitoring program. This program included socioeconomic monitoring—the systematic observation and measurement of a set...

  11. Assessment of the State-of-the-Art in the Design and Manufacturing of Large Composite Structure

    NASA Technical Reports Server (NTRS)

    Harris, C. E.

    2001-01-01

    This viewgraph presentation gives an assessment of the state-of-the-art in the design and manufacturing of large component structures, including details on the use of continuous fiber reinforced polymer matrix composites (CFRP) in commercial and military aircraft and in space launch vehicles. Project risk mitigation plans must include a building-block test approach to structural design development, manufacturing process scale-up development tests, and pre-flight ground tests to verify structural integrity. The potential benefits of composite structures justifies NASA's investment in developing the technology. Advanced composite structures technology is enabling to virtually every Aero-Space Technology Enterprise Goal.

  12. Application of remote sensing technology to land evaluation, planning utilization of land resources, and assessment of wildlife areas in eastern South Dakota

    NASA Technical Reports Server (NTRS)

    1975-01-01

    A soils map for land evaluation in Potter County (Eastern South Dakota) was developed to demonstrate the use of remote sensing technology in the area of diverse parent materials and topography. General land use and soils maps have also been developed for land planning LANDSAT, RB-57 imagery, and USGS photographs are being evaluated for making soils and land use maps. LANDSAT fulfilled the requirements for general land use and a general soils map. RB-57 imagery supplemented by large scale black and white stereo coverage was required to provide the detail needed for the final soils map for land evaluation. Color infrared prints excelled black and white coverage for this soil mapping effort. An identification and classification key for wetland types in the Lake Dakota Plain was developed for June 1975 using color infrared imagery. Wetland types in the region are now being mapped via remote sensing techniques to provide a current inventory for development of mitigation measures.

  13. The Role of Compensation Criteria to Minimize Face-Time Bias and Support Faculty Career Flexibility: An Approach to Enhance Career Satisfaction in Academic Pathology.

    PubMed

    Howell, Lydia Pleotis; Elsbach, Kimberly D; Villablanca, Amparo C

    2016-01-01

    Work-life balance is important to recruitment and retention of the younger generation of medical faculty, but medical school flexibility policies have not been fully effective. We have reported that our school's policies are underutilized due to faculty concerns about looking uncommitted to career or team. Since policies include leaves and accommodations that reduce physical presence, faculty may fear "face-time bias," which negatively affects evaluation of those not "seen" at work. Face-time bias is reported to negatively affect salary and career progress. We explored face-time bias on a leadership level and described development of compensation criteria intended to mitigate face-time bias, raise visibility, and reward commitment and contribution to team/group goals. Leaders from 6 partner departments participated in standardized interviews and group meetings. Ten compensation plans were analyzed, and published literature was reviewed. Leaders did not perceive face-time issues but saw team pressure and perception of availability as performance motivators. Compensation plans were multifactor productivity based with many quantifiable criteria; few addressed team contributions. Using these findings, novel compensation criteria were developed based on a published model to mitigate face-time bias associated with team perceptions. Criteria for organizational citizenship to raise visibility and reward group outcomes were included. We conclude that team pressure and perception of availability have the potential to lead to bias and may contribute to underuse of flexibility policies. Recognizing organizational citizenship and cooperative effort via specific criteria in a compensation plan may enhance a culture of flexibility. These novel criteria have been effective in one pilot department.

  14. Conservation plan for protected species on Naval Petroleum Reserve No. 1, Kern County, California

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Otten, M.R.M.; Cypher, B.L.

    1997-07-01

    Habitats in and around Naval Petroleum Reserve No. 1 (NPR-1) support populations of various vertebrates and plants, including a number of threatened and endangered species. Adequate conservation of habitats and species, particularly protected species, can be facilitated through development and implementation of management plans. This document provides a comprehensive plan for the conservation of protected species on NPR-1, through compliance with terms and conditions expressed in Biological Opinions rendered by the U.S. Fish and Wildlife Service for NPR-1 activities. Six conservation strategies by which threatened and endangered species have been, and will be, protected are described: population monitoring, mitigation strategies,more » special studies, operating guidelines and policies, information transfer and outreach, and the endangered species conservation area. Population monitoring programs are essential for determining population densities and for assessing the effects of oil field developments and environmental factors on protected species. Mitigation strategies (preactivity surveys and habitat reclamation) are employed to minimize the loss of important habitats components and to restore previously disturbed lands to conditions more suitable for species` use. A number of special studies were undertaken between 1985 and 1995 to investigate the effectiveness of a variety of population and habitat management techniques with the goal of increasing the density of protected species. Operating guidelines and policies governing routine oil field activities continue to be implemented to minimize the potential for the incidental take of protected species and minimize damage to wildlife habitats. Information transfer and outreach activities are important means by which technical and nontechnical information concerning protected species conservation on NPR-1 is shared with both the scientific and non-scientific public.« less

  15. Habitat Evaluation Procedures (HEP) Report : Malheur River Wildlife Mitigation, 2000-2002 Technical Report.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Gonzalez, Daniel; Wenick, Jess

    The development of hydropower systems within the Columbia and Snake River basins has affected a tremendous amount of fish and wildlife species. The dams have played a major role in the rapid extinction of anadromous runs of salmon and steelhead as well as other native salmonids. Inundation of these dams and the construction of reservoirs for irrigation have also severely impacted wildlife species. In some cases, fluctuating water levels caused by dam and reservoir operations have created barren vegetation zones that expose wildlife to predation and a reduction in recruitment. In association with hydropower activities, secondary impacts have also challengedmore » and highly impacted a majority of wildlife species. The construction of roads, facilities, urban development, channelization, and diversions of streams and rivers often have negative long-term effects on fish, wildlife, and vegetation. In response to these concerns, the United States Congress passed the Pacific Electric Power Planning Conservation Act (Act) in 1980. The Act authorized four states (Idaho, Montana, Oregon and Washington) and 13 Indian Tribes (including the Burns Paiute Tribe) to create the Northwest Power Planning Council (Council). The role of the Council is to prepare a program in conjunction with several participants that protects, mitigates and enhances affected species within the Columbia River Basin and its tributaries. The Council's program, known as the Columbia River Basin's Fish and Wildlife Program (Program), has evolved over the years into a basin-wide approach that incorporates management plans for 52 subbasins. The Program includes a public involvement component that requires Program participants to provide the public with meaningful opportunities to comment on specific management proposals. Participants in this Program include the region's fish and wildlife agencies, Indian tribes, the public and an 11-member panel of scientists referred to as the Independent Scientific Review Panel (ISRP). Program participants are responsible for creating management plans for each of the 52 subbasins. Upon approval by the Council, the management plan is then incorporated into the Program. In 1998, the Tribe submitted two land acquisition proposals for funding through Bonneville's Wildlife Mitigation Program, the Logan Valley and Malheur River Wildlife Mitigation Projects. After several months of rigorous scrutiny and defense of its project presentations, the Tribe was awarded both acquisitions. In February of 2000, the Tribe and BPA entered into a Memorandum of Agreement (MOA) to fund the acquisition and management of Logan Valley and the Malheur River Projects. In April and November of 2000, the Tribe acquired the Logan Valley property (Project) and the Malheur River Wildlife Mitigation Project, respectively. The MOA requires the Tribe to dedicate the Project to wildlife habitat protection. Project management must be consistent with the term and conditions of the MOA and a site-specific management plan (Plan) that is to be prepared by the Tribe. The Malheur River Wildlife Mitigation Project (Denny Jones Ranch) allows the Tribe to manage 6,385 acres of meadow, wetland, and sagebrush steppe habitats along the Malheur River. The deeded property includes seven miles of the Malheur River, the largest private landholding along this waterway between Riverside and Harper. The property came with approximately 938 acres of senior water rights and 38,377 acres of federal and state grazing allotments. The project will benefit a diverse population of fish, wildlife, and plant species. Objectives include reviving and improving critical habitat for fish and wildlife populations, controlling/ eradicating weed populations, improving water quality, maintaining Bureau of Land Management (BLM) allotments, and preserving cultural resources. Before the Tribe acquired the project site, a combination of high levels of cattle stocking rates, management strategy, and a disruption of natural disturbance regimes compromised the property's ability to provide quality habitat to wildlife species found in the area. As a result, rangeland condition was depleted, exotic annual grasses and other noxious weeds began to invade native plant communities and many riparian areas were generally degraded. Native meadow communities were also leveled and planted with introduced species shortly after settlement and wildlife use and historic home ranges for migratory species have been severely altered. Current management is actively seeking to enhance the ability of the site's plant communities to support resident fauna that are known to have thrived in the area prior to settlement. The Tribe is utilizing a baseline approach to its overall land management by recognizing the importance of plant succession in achieving wildlife goal.« less

  16. Models Required to Mitigate Impacts of Space Weather on Space Systems

    NASA Technical Reports Server (NTRS)

    Barth, Janet L.

    2003-01-01

    This viewgraph presentation attempts to develop a model of factors which need to be considered in the design and construction of spacecraft to lessen the effects of space weather on these vehicles. Topics considered include: space environments and effects, radiation environments and effects, space weather drivers, space weather models, climate models, solar proton activity and mission design for the GOES mission. The authors conclude that space environment models need to address issues from mission planning through operations and a program to develop and validate authoritative space environment models for application to spacecraft design does not exist at this time.

  17. Techniques to Assess and Mitigate the Environmental Risk Posed by use of Airguns: Recent Advances from Academic Research Programs

    NASA Astrophysics Data System (ADS)

    Miller, P. J.; Tyack, P. L.; Johnson, M. P.; Madsen, P. T.; King, R.

    2006-05-01

    There is considerable uncertainty about the ways in which marine mammals might react to noise, the biological significance of reactions, and the effectiveness of planning and real-time mitigation techniques. A planning tool commonly used to assess environmental risk of acoustic activities uses simulations to predict acoustic exposures received by animals, and translates exposure to response using a dose-response function to yield an estimate of the undesired impact on a population. Recent advances show promise to convert this planning tool into a real-time mitigation tool, using Bayesian statistical methods. In this approach, being developed for use by the British Navy, the environmental risk simulation is updated continuously during field operations. The distribution of exposure, set initially based on animal density, is updated in real-time using animal sensing data or environmental data known to correlate with the absence or presence of marine mammals. This conditional probability of animal presence should therefore be more accurate than prior probabilities used during planning, which enables a more accurate and quantitative assessment of both the impact of activities and reduction of impact via mitigation decisions. Two key areas of uncertainty in addition to animal presence/absence are 1.) how biologically-relevant behaviours are affected by exposure to noise, and 2.) whether animals avoid loud noise sources, which is the basis of ramp-up as a mitigation tool. With support from MMS and industry partners, we assessed foraging behaviour and avoidance movements of 8 tagged sperm whales in the Gulf of Mexico during experimental exposure to airguns. The whale that was approached most closely prolonged a surface resting bout hours longer than typical, but resumed foraging immediately after the airguns ceased, suggesting avoidance of deep diving necessary for foraging near active airguns. Behavioral indices of foraging rate (echolocation buzzes produced during prey capture) and locomotion (from pitching movements generated by active swimming) of the 7 remaining exposed whales were compared to sham exposure and post-exposure control periods in 13 unexposed whales. Pitching movements were 6% lower during exposure (P=0.014) with all 7 whales reducing pitching movements. Buzz rates were 19% lower during the exposure condition, but this difference was not statistically significant (P=0.141). The substantial change in mean buzz rate from this small sample motivated a Bayesian analysis, which determined that a model of reduced buzz rate had roughly 3x more posterior support than no effect. Despite the likely impact of airguns on foraging, no avoidance by tagged sperm whales was observed during gradual ramp-up at distances of 7-13km, or full array exposures at 1-13km, calling into question the effectiveness of ramp-up. These results demonstrate that response data can be collected at measured exposure levels, and should motivate additional studies of the effects of airguns on foraging, particularly in waters without such a long history of seismic exploration as the Gulf of Mexico.

  18. 44 CFR 201.7 - Tribal Mitigation Plans.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... events. (ii) A description of the Indian tribal government's vulnerability to the hazards described in... its impact on the tribe. The plan should describe vulnerability in terms of: (A) The types and numbers... or avoid long-term vulnerabilities to the identified hazards. (ii) A section that identifies and...

  19. 75 FR 20780 - Approval and Promulgation of Implementation Plans; Revisions to the Kentucky State Implementation...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-21

    ... transportation conformity revisions to the Kentucky State Implementation Plan (SIP) submitted by the Commonwealth...). This addition consists of transportation conformity criteria and procedures related to interagency consultation and enforceability of certain transportation-related control measures and mitigation measures. The...

  20. Risk management frameworks: supporting the next generation of Murray-Darling Basin water sharing plans

    NASA Astrophysics Data System (ADS)

    Podger, G. M.; Cuddy, S. M.; Peeters, L.; Smith, T.; Bark, R. H.; Black, D. C.; Wallbrink, P.

    2014-09-01

    Water jurisdictions in Australia are required to prepare and implement water resource plans. In developing these plans the common goal is realising the best possible use of the water resources - maximising outcomes while minimising negative impacts. This requires managing the risks associated with assessing and balancing cultural, industrial, agricultural, social and environmental demands for water within a competitive and resource-limited environment. Recognising this, conformance to international risk management principles (ISO 31000:2009) have been embedded within the Murray-Darling Basin Plan. Yet, to date, there has been little strategic investment by water jurisdictions in bridging the gap between principle and practice. The ISO 31000 principles and the risk management framework that embodies them align well with an adaptive management paradigm within which to conduct water resource planning. They also provide an integrative framework for the development of workflows that link risk analysis with risk evaluation and mitigation (adaptation) scenarios, providing a transparent, repeatable and robust platform. This study, through a demonstration use case and a series of workflows, demonstrates to policy makers how these principles can be used to support the development of the next generation of water sharing plans in 2019. The workflows consider the uncertainty associated with climate and flow inputs, and model parameters on irrigation and hydropower production, meeting environmental flow objectives and recreational use of the water resource. The results provide insights to the risks associated with meeting a range of different objectives.