Sample records for develop remediation plans

  1. Remediation plans in family medicine residency

    PubMed Central

    Audétat, Marie-Claude; Voirol, Christian; Béland, Normand; Fernandez, Nicolas; Sanche, Gilbert

    2015-01-01

    Abstract Objective To assess use of the remediation instrument that has been implemented in training sites at the University of Montreal in Quebec to support faculty in diagnosing and remediating resident academic difficulties, to examine whether and how this particular remediation instrument improves the remediation process, and to determine its effects on the residents’ subsequent rotation assessments. Design A multimethods approach in which data were collected from different sources: remediation plans developed by faculty, program statistics for the corresponding academic years, and students’ academic records and rotation assessment results. Setting Family medicine residency program at the University of Montreal. Participants Family medicine residents in academic difficulty. Main outcome measures Assessment of the content, process, and quality of remediation plans, and students’ academic and rotation assessment results (successful, below expectations, or failure) both before and after the remediation period. Results The framework that was developed for assessing remediation plans was used to analyze 23 plans produced by 10 teaching sites for 21 residents. All plans documented cognitive problems and implemented numerous remediation measures. Although only 48% of the plans were of good quality, implementation of a remediation plan was positively associated with the resident’s success in rotations following the remediation period. Conclusion The use of remediation plans is well embedded in training sites at the University of Montreal. The residents’ difficulties were mainly cognitive in nature, but this generally related to deficits in clinical reasoning rather than knowledge gaps. The reflection and analysis required to produce a remediation plan helps to correct many academic difficulties and normalize the academic career of most residents in difficulty. Further effort is still needed to improve the quality of plans and to support teachers.

  2. Time to Loosen the Apron Strings: Cohort-based Evaluation of a Learner-driven Remediation Model at One Medical School.

    PubMed

    Bierer, S Beth; Dannefer, Elaine F; Tetzlaff, John E

    2015-09-01

    Remediation in the era of competency-based assessment demands a model that empowers students to improve performance. To examine a remediation model where students, rather than faculty, develop remedial plans to improve performance. Private medical school, 177 medical students. A promotion committee uses student-generated portfolios and faculty referrals to identify struggling students, and has them develop formal remediation plans with personal reflections, improvement strategies, and performance evidence. Students submit reports to document progress until formally released from remediation by the promotion committee. Participants included 177 students from six classes (2009-2014). Twenty-six were placed in remediation, with more referrals occurring during Years 1 or 2 (n = 20, 76 %). Unprofessional behavior represented the most common reason for referral in Years 3-5. Remedial students did not differ from classmates (n = 151) on baseline characteristics (Age, Gender, US citizenship, MCAT) or willingness to recommend their medical school to future students (p < 0.05). Two remedial students did not graduate and three did not pass USLME licensure exams on first attempt. Most remedial students (92 %) generated appropriate plans to address performance deficits. Students can successfully design remedial interventions. This learner-driven remediation model promotes greater autonomy and reinforces self-regulated learning.

  3. 24 CFR 590.31 - Corrective and remedial action.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 24 Housing and Urban Development 3 2011-04-01 2010-04-01 true Corrective and remedial action. 590.31 Section 590.31 Housing and Urban Development Regulations Relating to Housing and Urban Development (Continued) OFFICE OF ASSISTANT SECRETARY FOR COMMUNITY PLANNING AND DEVELOPMENT, DEPARTMENT OF HOUSING AND...

  4. 24 CFR 590.31 - Corrective and remedial action.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 24 Housing and Urban Development 3 2010-04-01 2010-04-01 false Corrective and remedial action. 590.31 Section 590.31 Housing and Urban Development Regulations Relating to Housing and Urban Development (Continued) OFFICE OF ASSISTANT SECRETARY FOR COMMUNITY PLANNING AND DEVELOPMENT, DEPARTMENT OF HOUSING AND...

  5. Remedial Action Report for Operable Units 6-05 and 10-04, Phase III

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    R. P. Wells

    2007-08-15

    This Phase III remedial action report addresses the remediation of lead-contaminated soils found at the Security Training Facility STF-02 Gun Range at the Idaho National Laboratory Site. Phase I, consisting of developing and implementing institutional controls at Operble Unit 10-04 sites and developing and implementing Idaho National Laboratory Site-wide plans for both institutional controls and ecological monitoring, was addressed in a previous report. Phase II will remediate sites contaminated with trinitrotoluene and Royal Demolition Explosive. Phase IV will remediate hazards from unexploded ordnance.

  6. Developing a Remedial Keller-Plan Course.

    ERIC Educational Resources Information Center

    Allen, Peter S.

    1978-01-01

    A remedial self-study course in physics has been successfully developed at Nottingham University through repeated evaluations and modifications in such areas as testing and course organization. The development of a self-instructional center, and the use of film and videotape packages, have also been successful. (JMD)

  7. A qualitative study of medical educators' perspectives on remediation: Adopting a holistic approach to struggling residents.

    PubMed

    Krzyzaniak, Sara M; Wolf, Stephen J; Byyny, Richard; Barker, Lisa; Kaplan, Bonnie; Wall, Stephen; Guerrasio, Jeannette

    2017-09-01

    During residency, some trainees require the identification and remediation of deficiencies to achieve the knowledge, skills and attitudes necessary for independent practice. Given the limited published frameworks for remediation, we characterize remediation from the perspective of educators and propose a holistic framework to guide the approach to remediation. We conducted semistructured focus groups to: explore methods for identifying struggling residents; categorize common domains of struggle; describe personal factors that contribute to difficulties; define remediation interventions and understand what constitutes successful completion. Data were analyzed through conventional content analysis. Nineteen physicians across multiple specialties and institutions participated in seven focus groups. Thirteen categories emerged around remediation. Some themes addressed practical components of remediation, while others reflected barriers to the process and the impact of remediation on the resident and program. The themes were used to inform development of a novel holistic framework for remediation. The approach to remediation requires comprehensive identification of individual factors impacting performance. The intervention should not only include a tailored learning plan but also address confounders that impact likelihood of remediation success. Our holistic framework intends to guide educators creating remediation plans to ensure all domains are addressed.

  8. Base Realignment and Closure (BRAC) Cleanup Plan

    DTIC Science & Technology

    1995-01-01

    remedial action (RA). A number of restoration-related compliance activities at Cameron Station have also been completed or are ongoing. These include...from the identification stage to completion of remedial actions and development of NFRAP documentation. Table 3-2 also lists the study area...5 4.1.3.2 Remediation Timelines and Documents ............. 4-6 4.1.4 Environmental Restoration Early Actions Strategy ........... 4-10 4.1.5 Remedy

  9. Economic Development Assistance for Communities Affected by Employment Changes Due to Military Base Closures (BRAC)

    DTIC Science & Technology

    2009-06-16

    resolution of disapproval is passed by Congress. Following the actual base closings and realignments, DOD develops an environmental remediation plan...examination of the BRAC process, For environmental remediation issues, see CRS Report RS21822, Military Base Closures: DOD’s 2005 Internal Selection...review and remediation . 2 Prior to the 1988 BRAC round, military installations were closed, or their missions were altered by order of the Secretary of

  10. ORNL Remedial Action Program strategy (FY 1987-FY 1992)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Trabalka, J.R.; Myrick, T.E.

    1987-12-01

    Over 40 years of Oak Ridge National Laboratory (ORNL) operations have produced a diverse legacy of contaminated inactive facilities, research areas, and waste disposal areas that are potential candidates for remedial action. The ORNL Remedial Action Program (RAP) represents a comprehensive effort to meet new regulatory requirements and ensure adequate protection of on-site workers, the public, and the environment by providing appropriate corrective measures at over 130 sites contaminated historically with radioactive, hazardous chemical, or mixed wastes. A structured path of program planning, site characterization, alternatives assessment, technology development, engineering design, continued site maintenance and surveillance, interim corrective action, andmore » eventual site closure or decommissioning is required to meet these objectives. This report documents the development of the Remedial Action Program, through its preliminary characterization, regulatory interface, and strategy development activities. It provides recommendations for a comprehensive, long-term strategy consistent with existing technical, institutional, and regulatory information, along with a six-year plan for achieving its initial objectives. 53 refs., 8 figs., 12 tabs.« less

  11. Technical approach to groundwater restoration. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1993-11-01

    The Technical Approach to Groundwater Restoration (TAGR) provides general technical guidance to implement the groundwater restoration phase of the Uranium Mill Tailings Remedial Action (UMTRA) Project. The TAGR includes a brief overview of the surface remediation and groundwater restoration phases of the UMTRA Project and describes the regulatory requirements, the National Environmental Policy Act (NEPA) process, and regulatory compliance. A section on program strategy discusses program optimization, the role of risk assessment, the observational approach, strategies for meeting groundwater cleanup standards, and remedial action decision-making. A section on data requirements for groundwater restoration evaluates the data quality objectives (DQO) andmore » minimum data required to implement the options and comply with the standards. A section on sits implementation explores the development of a conceptual site model, approaches to site characterization, development of remedial action alternatives, selection of the groundwater restoration method, and remedial design and implementation in the context of site-specific documentation in the site observational work plan (SOWP) and the remedial action plan (RAP). Finally, the TAGR elaborates on groundwater monitoring necessary to evaluate compliance with the groundwater cleanup standards and protection of human health and the environment, and outlines licensing procedures.« less

  12. Risk communication and trust in decision-maker action: a case study of the Giant Mine Remediation Plan.

    PubMed

    Jardine, Cynthia G; Banfield, Laura; Driedger, S Michelle; Furgal, Christopher M

    2013-01-01

    The development and implementation of a remediation plan for the residual arsenic trioxide stored at the former Giant Mine site in the Canadian Northwest Territories has raised important issues related to trust. Social and individual trust of those responsible for making decisions on risks is critically important in community judgements on risk and the acceptability of risk management decisions. Trust is known to be affected by value similarity and confidence in past performance, which serve as interacting sources of cooperation in acting toward a common goal. To explore the elements of trust associated with the development and implementation of the Giant Mine Remediation Plan. Semi-structured interviews were conducted with eight purposively selected key informants representing both various interested and affected parties and the two government proponents. Five primary issues related to trust were identified by the participants: (1) a historical legacy of mistrust between the community (particularly Aboriginal peoples) and government; (2) barriers to building trust with the federal government; (3) limited community input and control over the decision-making process; (4) the conflicted and confounded role of the government agencies being both proponent and regulator, and the resulting need for independent oversight; and (5) distrust of the government to commit to the perpetual care required for the remediation option selected. The dual-mode model of trust and confidence was shown to be a useful framework for understanding the pivotal role of trust in the development of the Giant Mine Remediation Plan. Failure to recognize issues of trust based on value dissimilarity and lack of confidence based on past performance have resulted in a lack of cooperation characterized by delayed remediation and a prolonged and expensive consultation process. Government recognition of the importance of trust to these issues will hopefully improve future communication and public engagement endeavours.

  13. 100-F Target Analyte List Development for Soil

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ovink, R.

    2012-09-18

    This report documents the process used to identify source area target analytes in support of the 100-F Area remedial investigation/feasibility study (RI/FS) addendum to the Integrated 100 Area Remedial Investigation/Feasibility Study Work Plan (DOE/RL-2008-46, Rev. 0).

  14. 100-K Target Analyte List Development for Soil

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ovink, R.

    2012-09-18

    This report documents the process used to identify source area target analytes in support of the 100-K Area remedial investigation/feasibility study (RI/FS) addendum to the Integrated 100 Area Remedial Investigation/Feasibility Study Work Plan (DOE/RL-2008-46, Rev. 0).

  15. 24 CFR 570.913 - Other remedies for noncompliance.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... Development (Continued) OFFICE OF ASSISTANT SECRETARY FOR COMMUNITY PLANNING AND DEVELOPMENT, DEPARTMENT OF... their counsel; (vi) Hold conferences for the settlement or simplification of the issues by consent of... Community Planning and Development files an exception and request for review by the Secretary. The excepting...

  16. 24 CFR 570.496 - Remedies for noncompliance; opportunity for hearing.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... and Urban Development (Continued) OFFICE OF ASSISTANT SECRETARY FOR COMMUNITY PLANNING AND DEVELOPMENT... the parties and their counsel; (vi) To hold conferences for the settlement or simplification of the... the decision, either the respondent or the Assistant Secretary for Community Planning and Development...

  17. Tank waste remediation system configuration management plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Vann, J.M.

    The configuration management program for the Tank Waste Remediation System (TWRS) Project Mission supports management of the project baseline by providing the mechanisms to identify, document, and control the functional and physical characteristics of the products. This document is one of the tools used to develop and control the mission and work. It is an integrated approach for control of technical, cost, schedule, and administrative information necessary to manage the configurations for the TWRS Project Mission. Configuration management focuses on five principal activities: configuration management system management, configuration identification, configuration status accounting, change control, and configuration management assessments. TWRS Projectmore » personnel must execute work in a controlled fashion. Work must be performed by verbatim use of authorized and released technical information and documentation. Application of configuration management will be consistently applied across all TWRS Project activities and assessed accordingly. The Project Hanford Management Contract (PHMC) configuration management requirements are prescribed in HNF-MP-013, Configuration Management Plan (FDH 1997a). This TWRS Configuration Management Plan (CMP) implements those requirements and supersedes the Tank Waste Remediation System Configuration Management Program Plan described in Vann, 1996. HNF-SD-WM-CM-014, Tank Waste Remediation System Configuration Management Implementation Plan (Vann, 1997) will be revised to implement the requirements of this plan. This plan provides the responsibilities, actions and tools necessary to implement the requirements as defined in the above referenced documents.« less

  18. Using Fish Tissue Data to Monitor Remedy Effectiveness

    EPA Science Inventory

    Chapter 8 of the Contaminated Sediment Remediation Guidance for Hazardous Waste Sites (OSWER Directive 9355.0-85, December 2005), presents an approach for developing an effective monitoring plan. As stated in the Guidance, one of the goals of monitoring is to “evaluate long-term ...

  19. OPTIMIZATION OF IN-SITU THERMAL REMEDIATION: THE LORING AFB STEAM INJECTION PROJECT EXAMPLE

    EPA Science Inventory

    Environmental remediation programs require that adequate planning be done before field work for characterization or remediation is undertaken. However, the heterogeneous nature of the subsurface can often thwart our best planning efforts. More recently, dynamic work plans which...

  20. PRE-QUALITY ASSURANCE PROJECT PLAN (QAPP) AGREEMENT (PQA) (HANDOUT)

    EPA Science Inventory

    The Land Remediation and Pollution Control Division (LRPCD) QA Manager strives to assist LRPCD researchers in developing functional planning documents for their research projects. As part of the planning process, several pieces of information are needed, including information re...

  1. 100-N Area Decision Unit Target Analyte List Development for Soil

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ovink, R.

    2012-09-18

    This report documents the process used to identify source area target analytes in support of the 100-N Area remedial investigation/feasibility study (RI/FS) addendum to the Integrated 100 Area Remedial Investigation/Feasibility Study Work Plan (DOE/RL-2008-46, Rev. 0).

  2. A needs analysis method for land-use planning of illegal dumping sites: a case study in Aomori-Iwate, Japan.

    PubMed

    Ishii, Kazuei; Furuichi, Toru; Nagao, Yukari

    2013-02-01

    Land use at contaminated sites, following remediation, is often needed for regional redevelopment. However, there exist few methods of developing economically and socially feasible land-use plans based on regional needs because of the wide variety of land-use requirements. This study proposes a new needs analysis method for the conceptual land-use planning of contaminated sites and illustrates this method with a case study of an illegal dumping site for hazardous waste. In this method, planning factors consisting of the land-use attributes and related facilities are extracted from the potential needs of the residents through a preliminary questionnaire. Using the extracted attributes of land use and the related facilities, land-use cases are designed for selection-based conjoint analysis. A second questionnaire for respondents to the first one who indicated an interest in participating in the second questionnaire is conducted for the conjoint analysis to determine the utility function and marginal cost of each attribute in order to prioritize the planning factors to develop a quantitative and economically and socially feasible land-use plan. Based on the results, site-specific land-use alternatives are developed and evaluated by the utility function obtained from the conjoint analysis. In this case study of an illegal dumping site for hazardous waste, the uses preferred as part of a conceptual land-use plan following remediation of the site were (1) agricultural land and a biogas plant designed to recover energy from biomass or (2) a park with a welfare facility and an athletic field. Our needs analysis method with conjoint analysis is applicable to the development of conceptual land-use planning for similar sites following remediation, particularly when added value is considered. Copyright © 2012 Elsevier Ltd. All rights reserved.

  3. Hazards Associated with Legacy Nitrate Salt Waste Drums Managed under the Container Isolation Plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Funk, David John; Clark, David Lewis

    At present, there are 29 drums of nitrate waste salts (oxidizers with potentially acidic liquid bearing RCRA characteristics D001 and D002) that are awaiting processing, specifically to eliminate these characteristics and to allow for ultimate disposition at WIPP. As a result of the Feb. 14th, 2014 drum breach at WIPP, and the subsequent identification of the breached drum as a product ofLANL TRU waste disposition on May 15th, 2014, these 29 containers were moved into the Perrnacon in Dome 231 at TA-54 Area G, as part of the New Mexico Environment Department (NMED) approved container isolation plan. The plan ismore » designed to mitigate hazards associated with the nitrate salt bearing waste stream. The purpose of this document is to articulate the hazards associated with un-remediated nitrate salts while in storage at LANL. These hazards are distinctly different from the Swheat-remediated nitrate salt bearing drums, and this document is intended to support the request to remove the un-remediated drums from management under the container isolation plan. Plans to remediate and/or treat both of these waste types are being developed separately, and are beyond the scope of this document.« less

  4. Remedial Action Plan and site design for stabilization of the inactive uranium mill tailings site at Durango, Colorado: Remedial action selection report. Revised final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1991-12-01

    The uranium mill tailings site near Durango, Colorado, was one of 24 inactive uranium mill sites designated to be remediated by the US Department of Energy (DOE) under the Uranium Mill Tailings Radiation Control Act of 1978 (UMTRCA). Part of the UMTRCA requires that the US Nuclear Regulatory Commission (NRC) concur with the DOE`s Remedial Action Plan (RAP) and certify that the remedial action conducted at the site complies with the standards promulgated by the US Environmental Protection Agency (EPA). Included in the RAP is this Remedial Action Selection Report (RAS), which has been developed to serve a two-fold purpose.more » First, it describes the activities that have been conducted by the DOE to accomplish remediation and long-term stabilization and control of the radioactive materials at the inactive uranium mill processing site near Durango, Colorado. Secondly, this document and the rest of the RAP, upon concurrence and execution by the DOE, the State of Colorado, and the NRC, become Appendix B of the Cooperative Agreement between the DOE and the State of Colorado.« less

  5. Remedial Action Plan and site design for stabilization of the inactive uranium mill tailings site at Durango, Colorado: Remedial action selection report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1991-12-01

    The uranium mill tailings site near Durango, Colorado, was one of 24 inactive uranium mill sites designated to be remediated by the US Department of Energy (DOE) under the Uranium Mill Tailings Radiation Control Act of 1978 (UMTRCA). Part of the UMTRCA requires that the US Nuclear Regulatory Commission (NRC) concur with the DOE's Remedial Action Plan (RAP) and certify that the remedial action conducted at the site complies with the standards promulgated by the US Environmental Protection Agency (EPA). Included in the RAP is this Remedial Action Selection Report (RAS), which has been developed to serve a two-fold purpose.more » First, it describes the activities that have been conducted by the DOE to accomplish remediation and long-term stabilization and control of the radioactive materials at the inactive uranium mill processing site near Durango, Colorado. Secondly, this document and the rest of the RAP, upon concurrence and execution by the DOE, the State of Colorado, and the NRC, become Appendix B of the Cooperative Agreement between the DOE and the State of Colorado.« less

  6. Heartland Engineers: A Century of Superior Service 1907-2007

    DTIC Science & Technology

    2009-01-01

    NJ SUPERFUND SITE, REMEDIAL DESIGN 104. INDEPENDENCE AAF: OEW LMS ASR-NOFA 105. INDEPENDENCE SATELLITE POW CAMP: PA/INPR 106. INVES. & ASSESS IMA-AR...the development of nuclear weaponry, under the Formerly Used Sites Remedial Action Plan (FUSRAP) for the Department of Energy as well as Formerly Used...further assist in the cleanup of Cold War legacy wastes through the U.S. Depart- ment of Energy’s Formerly Utilized Sites Remedial Action Program

  7. 40 CFR 85.1803 - Remedial Plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... POLLUTION FROM MOBILE SOURCES Recall Regulations § 85.1803 Remedial Plan. (a) When any manufacturer is... the total parts requirement of each person who is to perform the repair under the remedial plan to be...: (i) The recall campaign number; and (ii) A code designating the campaign facility at which the repair...

  8. 40 CFR 92.704 - Notice to manufacturer or remanufacturer of nonconformity; submission of remedial plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... remanufacturer of nonconformity; submission of remedial plan. 92.704 Section 92.704 Protection of Environment... nonconformity; submission of remedial plan. (a) The manufacturer or remanufacturer will be notified whenever the... category of locomotives or locomotive engines encompassed by the determination of nonconformity, will give...

  9. Site observational work plan for the UMTRA Project site at Monument Valley, Arizona

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1995-09-01

    The site observational work plan (SOWP) for the Monument Valley, Arizona, US Department of Energy (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project site is one of the first site-specific documents developed to achieve ground water compliance at the site. This SOWP applies information about the Monument Valley site to a regulatory compliance framework that identifies strategies that could be used to meet ground water compliance. The compliance framework was developed in the UMTRA Ground Water programmatic environmental impact statement (DOE, 1995). The DOE`s goal is to implement a cost-effective site strategy that complies with the US Environmental Protection Agencymore » (EPA) ground water standards and protects human health and the environment. The compliance strategy that emerges in the final version of the SOWP will assess potential environmental impacts and provide stakeholder a forum for review and comment. When the compliance strategy is acceptable, it will be detailed in a remedial action plan that will be subject to review by the state and/or tribe and concurrence by the US Nuclear Regulatory Commission (NRC). Information available for the preparation of this SOWP indicates active remediation is the most likely compliance strategy for the Monument Valley site. Additional data are needed to determine the most effective remediation technology.« less

  10. Radon control activities for lung cancer prevention in national comprehensive cancer control program plans, 2005-2011.

    PubMed

    Neri, Antonio; Stewart, Sherri L; Angell, William

    2013-08-08

    Radon is the second leading cause of lung cancer among smokers and the leading cause among nonsmokers. The US Environmental Protection Agency recommends that every home be tested for radon. Comprehensive Cancer Control (CCC) programs develop cancer coalitions that coordinate funding and resources to focus on cancer activities that are recorded in cancer plans. Radon tests, remediation, and radon mitigation techniques are relatively inexpensive, but it is unclear whether coalitions recognize radon as an important carcinogen. We reviewed 65 cancer plans created from 2005 through 2011 for the terms "radon," "radiation," or "lung." Plan activities were categorized as radon awareness, home testing, remediation, supporting radon policy activities, or policy evaluation. We also reviewed each CCC program's most recent progress report. Cancer plan content was reviewed to assess alignment with existing radon-specific policies in each state. Twenty-seven of the plans reviewed (42%) had radon-specific terminology. Improving awareness of radon was included in all 27 plans; also included were home testing (n=21), remediation (n=11), support radon policy activities (n=13), and policy evaluation (n=1). Three plans noted current engagement in radon activities. Thirty states had radon-specific laws; most (n=21) were related to radon professional licensure. Eleven states had cancer plan activities that aligned with existing state radon laws. Although several states have radon-specific policies, approximately half of cancer coalitions may not be aware of radon as a public health issue. CCC-developed cancer coalitions and plans should prioritize tobacco control to address lung cancer but should consider addressing radon through partnership with existing radon control programs.

  11. 49 CFR 27.11 - Remedial action, voluntary action and compliance planning.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 1 2011-10-01 2011-10-01 false Remedial action, voluntary action and compliance....11 Remedial action, voluntary action and compliance planning. (a) Remedial action. (1) If the... discrimination not occurred. (b) Voluntary action. A recipient may take steps, in addition to any action that is...

  12. PRE-QAPP AGREEMENT (PQA) AND ANALYTICAL METHOD CHECKLISTS (AMCS): TOOLS FOR PLANNING RESEARCH PROJECTS

    EPA Science Inventory

    The Land Remediation and Pollution Control Division (LRPCD) QA Manager strives to assist LRPCD researchers in developing functional planning documents for their research projects. As part of the planning process, several pieces of information are needed, including information re...

  13. 40 CFR 1068.510 - How do I prepare and apply my remedial plan?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ...) AIR POLLUTION CONTROLS GENERAL COMPLIANCE PROVISIONS FOR ENGINE PROGRAMS Reporting Defects and Recalling Engines/Equipment § 1068.510 How do I prepare and apply my remedial plan? (a) In your remedial plan, describe all of the following: (1) The class or category of engines/equipment to be recalled...

  14. Health and safety plan for the Remedial Investigation and Site Investigation of Waste Area Grouping 2 at the Oak Ridge National Laboratory, Oak Ridge, Tennessee. Environmental Restoration Program

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Cofer, G.H.; Holt, V.L.; Roupe, G.W.

    1993-11-01

    This health and safety plan (HASP) was developed by the members of the Measurement Applications and Development Group of the Health Science Research Division at the Oak Ridge National Laboratory (ORNL). This plan was prepared to ensure that health and safety related items for the Waste Area Grouping (WAG) 2 Remedial Investigation (RI)/Feasibility Study and Site Investigation projects conform with the requirements of 29 CFR 1910.120 (April 18, 1992). The RI Plan calls for the characterization, monitoring, risk assessment, and identification of remedial needs and alternatives that have been structured and staged with short-term and long-term objectives. In early FYmore » 1992, the WAG 2 RI was integrated with the ORNL Environmental Restoration (ER) Site Investigations program in order to achieve the complimentary objectives of the projects more effectively by providing an integrated basis of support. The combined effort was named the WAG 2 Remedial Investigation and Site Investigations Program (WAG 2 RI&SI). The Site Investigation activities are a series of monitoring efforts and directed investigations that support other ER activities by providing information about (1) watershed hydrogeology; (2) contaminants, pathways, and fluxes for groundwater at ORNL; (3) shallow subsurface areas that can act as secondary sources of contaminants; and (4) biological populations and contaminants in biota, in addition to other support and coordination activities.« less

  15. Internship - practical education

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Porell, A.L.; Bauman, H.F.

    1989-01-01

    The current emphasis on regulatory compliance with environmental laws has depleted the availability of experienced environmental scientists and engineers needed to initiate critical environmental projects. Further, projects of short duration and long-term commitments to employment situations are considered a high risk for both the employer and the employee. Martin Marietta Energy Systems, Inc., has met this challenge for federal agencies through the US Department of Energy's (DOE's) Hazardous Waste Remedial Actions Program (HAZWRAP). Through unique interdepartmental agency agreements between the DOE and the Department of Defense (DOD) and contractual arrangements between Energy Systems, DOE, and the University of Tennessee's (UT's)more » Waste Management Institute (WMI), an intern program was formulated. HAZWRAP is a DOE headquarters' program for addressing hazardous-waste issues at all DOE facilities. Energy Systems is the support contractor office responsible for developing policies and implementing plans for this program. Under this charter, HAZWRAP assembled a large staff of experienced project managers for developing remedial actions plans, while providing other federal agencies assistance in implementing their remedial actions programs. HAZWRAP project managers are currently managing remedial investigations and feasibility studies at 130 federal facilities located throughout the DOD.« less

  16. ReSCA: decision support tool for remediation planning after the Chernobyl accident.

    PubMed

    Ulanovsky, A; Jacob, P; Fesenko, S; Bogdevitch, I; Kashparov, V; Sanzharova, N

    2011-03-01

    Radioactive contamination of the environment following the Chernobyl accident still provide a substantial impact on the population of affected territories in Belarus, Russia, and Ukraine. Reduction of population exposure can be achieved by performing remediation activities in these areas. Resulting from the IAEA Technical Co-operation Projects with these countries, the program ReSCA (Remediation Strategies after the Chernobyl Accident) has been developed to provide assistance to decision makers and to facilitate a selection of an optimized remediation strategy in rural settlements. The paper provides in-depth description of the program, its algorithm, and structure. © Springer-Verlag 2010

  17. Proposed plan for remedial action for the Groundwater Operable Unit at the Chemical Plant Area of the Weldon Spring Site, Weldon Spring, Missouri

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1999-08-10

    This Proposed Plan addresses the remediation of groundwater contamination at the chemical plant area of the Weldon Spring site in Weldon Spring, Missouri. The site is located approximately 48 km (30 mi) west of St. Louis in St. Charles County . Remedial activities at the site will be conducted in accordance with the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA). The U.S. Department of Energy (DOE), in conjunction with the U.S. Department of the Army (DA), conducted a joint remedial investigation/feasibility study (RI/FS) to allow for a comprehensive evaluation of groundwater conditions at the Weldon Spring chemical plant areamore » and the Weldon Spring ordnance works area, which is an Army site adjacent to the chemical plant area. Consistent with DOE policy, National Environmental Policy Act (NEPA) values have been incorporated into the CERCLA process. That is, the analysis conducted and presented in the RVFS reports included an evaluation of environmental impacts that is comparable to that performed under NEPA. This Proposed Plan summarizes information about chemical plant area groundwater that is presented in the following documents: (1) The Remedial Investigation (RI), which presents information on the nature and extent of contamination; (2) The Baseline Risk Assessment (BRA), which evaluates impacts to human health and the environment that could occur if no cleanup action of the groundwater were taken (DOE and DA 1997a); and (3) The Feasibility Study (FS) and the Supplemental FS, which develop and evaluate remedial action alternatives for groundwater remediation.« less

  18. 10 CFR 765.30 - Reimbursement of costs incurred in accordance with a plan for subsequent remedial action.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... COSTS OF REMEDIAL ACTION AT ACTIVE URANIUM AND THORIUM PROCESSING SITES Additional Reimbursement... satisfied in full by the licensee, and (2) The total cost of remedial action required at the site, together... at the site, as determined in the approved plan for subsequent remedial action, by the Federal...

  19. PLAN-TA9-2443(U), Rev. B Remediated Nitrate Salt (RNS) Surrogate Formulation and Testing Standard Procedure

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Brown, Geoffrey Wayne

    2016-03-16

    This document identifies scope and some general procedural steps for performing Remediated Nitrate Salt (RNS) Surrogate Formulation and Testing. This Test Plan describes the requirements, responsibilities, and process for preparing and testing a range of chemical surrogates intended to mimic the energetic response of waste created during processing of legacy nitrate salts. The surrogates developed are expected to bound1 the thermal and mechanical sensitivity of such waste, allowing for the development of process parameters required to minimize the risk to worker and public when processing this waste. Such parameters will be based on the worst-case kinetic parameters as derived frommore » APTAC measurements as well as the development of controls to mitigate sensitivities that may exist due to friction, impact, and spark. This Test Plan will define the scope and technical approach for activities that implement Quality Assurance requirements relevant to formulation and testing.« less

  20. Radon Control Activities for Lung Cancer Prevention in National Comprehensive Cancer Control Program Plans, 2005–2011

    PubMed Central

    Stewart, Sherri L.; Angell, William

    2013-01-01

    Introduction Radon is the second leading cause of lung cancer among smokers and the leading cause among nonsmokers. The US Environmental Protection Agency recommends that every home be tested for radon. Comprehensive Cancer Control (CCC) programs develop cancer coalitions that coordinate funding and resources to focus on cancer activities that are recorded in cancer plans. Radon tests, remediation, and radon mitigation techniques are relatively inexpensive, but it is unclear whether coalitions recognize radon as an important carcinogen. Methods We reviewed 65 cancer plans created from 2005 through 2011 for the terms “radon,” “radiation,” or “lung.” Plan activities were categorized as radon awareness, home testing, remediation, supporting radon policy activities, or policy evaluation. We also reviewed each CCC program’s most recent progress report. Cancer plan content was reviewed to assess alignment with existing radon-specific policies in each state. Results Twenty-seven of the plans reviewed (42%) had radon-specific terminology. Improving awareness of radon was included in all 27 plans; also included were home testing (n = 21), remediation (n = 11), support radon policy activities (n = 13), and policy evaluation (n = 1). Three plans noted current engagement in radon activities. Thirty states had radon-specific laws; most (n = 21) were related to radon professional licensure. Eleven states had cancer plan activities that aligned with existing state radon laws. Conclusion Although several states have radon-specific policies, approximately half of cancer coalitions may not be aware of radon as a public health issue. CCC-developed cancer coalitions and plans should prioritize tobacco control to address lung cancer but should consider addressing radon through partnership with existing radon control programs. PMID:23928457

  1. Economic Development Assistance for Communities Affected by Employment Changes Due to Military Base Closures (BRAC)

    DTIC Science & Technology

    2009-01-30

    to assess loan risk are the following: (1) the length of the proposed repayment period; (2) the ratio of expected annual debt service...develops an environmental remediation plan to enable the conveyance of surplus federal land to other entities.1 Military facilities were closed and...1 For a detailed examination of the BRAC process, For environmental remediation issues, see CRS Report RS21822, Military Base

  2. Development and Testing of Geo-Processing Models for the Automatic Generation of Remediation Plan and Navigation Data to Use in Industrial Disaster Remediation

    NASA Astrophysics Data System (ADS)

    Lucas, G.; Lénárt, C.; Solymosi, J.

    2015-08-01

    This paper introduces research done on the automatic preparation of remediation plans and navigation data for the precise guidance of heavy machinery in clean-up work after an industrial disaster. The input test data consists of a pollution extent shapefile derived from the processing of hyperspectral aerial survey data from the Kolontár red mud disaster. Three algorithms were developed and the respective scripts were written in Python. The first model aims at drawing a parcel clean-up plan. The model tests four different parcel orientations (0, 90, 45 and 135 degree) and keeps the plan where clean-up parcels are less numerous considering it is an optimal spatial configuration. The second model drifts the clean-up parcel of a work plan both vertically and horizontally following a grid pattern with sampling distance of a fifth of a parcel width and keep the most optimal drifted version; here also with the belief to reduce the final number of parcel features. The last model aims at drawing a navigation line in the middle of each clean-up parcel. The models work efficiently and achieve automatic optimized plan generation (parcels and navigation lines). Applying the first model we demonstrated that depending on the size and geometry of the features of the contaminated area layer, the number of clean-up parcels generated by the model varies in a range of 4% to 38% from plan to plan. Such a significant variation with the resulting feature numbers shows that the optimal orientation identification can result in saving work, time and money in remediation. The various tests demonstrated that the model gains efficiency when 1/ the individual features of contaminated area present a significant orientation with their geometry (features are long), 2/ the size of pollution extent features becomes closer to the size of the parcels (scale effect). The second model shows only 1% difference with the variation of feature number; so this last is less interesting for planning optimization applications. Last model rather simply fulfils the task it was designed for by drawing navigation lines.

  3. Use of geostatistics for remediation planning to transcend urban political boundaries.

    PubMed

    Milillo, Tammy M; Sinha, Gaurav; Gardella, Joseph A

    2012-11-01

    Soil remediation plans are often dictated by areas of jurisdiction or property lines instead of scientific information. This study exemplifies how geostatistically interpolated surfaces can substantially improve remediation planning. Ordinary kriging, ordinary co-kriging, and inverse distance weighting spatial interpolation methods were compared for analyzing surface and sub-surface soil sample data originally collected by the US EPA and researchers at the University at Buffalo in Hickory Woods, an industrial-residential neighborhood in Buffalo, NY, where both lead and arsenic contamination is present. Past clean-up efforts estimated contamination levels from point samples, but parcel and agency jurisdiction boundaries were used to define remediation sites, rather than geostatistical models estimating the spatial behavior of the contaminants in the soil. Residents were understandably dissatisfied with the arbitrariness of the remediation plan. In this study we show how geostatistical mapping and participatory assessment can make soil remediation scientifically defensible, socially acceptable, and economically feasible. Copyright © 2012 Elsevier Ltd. All rights reserved.

  4. Adaptive management: a paradigm for remediation of public facilities

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Janecky, David R; Whicker, Jeffrey J; Doerr, Ted B

    2009-01-01

    Public facility restoration planning traditionally focused on response to natural disasters and hazardous materials accidental releases. These plans now need to integrate response to terrorist actions. Therefore, plans must address a wide range of potential vulnerabilities. Similar types of broad remediation planning are needed for restoration of waste and hazardous material handling areas and facilities. There are strong similarities in damage results and remediation activities between unintentional and terrorist actions; however, the uncertainties associated with terrorist actions result in a re-evaluation of approaches to planning. Restoration of public facilities following a release of a hazardous material is inherently far moremore » complex than in confined industrial settings and has many unique technical, economic, social, and political challenges. Therefore, they arguably involve a superset of drivers, concerns and public agencies compared to other restoration efforts. This superset of conditions increases complexity of interactions, reduces our knowledge of the initial conditions, and even condenses the timeline for restoration response. Therefore, evaluations of alternative restoration management approaches developed for responding to terrorist actions provide useful knowledge for large, complex waste management projects. Whereas present planning documents have substantial linearity in their organization, the 'adaptive management' paradigm provides a constructive parallel operations paradigm for restoration of facilities that anticipates and plans for uncertainty, multiple/simUltaneous public agency actions, and stakeholder participation. Adaptive management grew out of the need to manage and restore natural resources in highly complex and changing environments with limited knowledge about causal relationships and responses to restoration actions. Similarities between natural resource management and restoration of a facility and surrounding area(s) after a disruptive event suggest numerous advantages over preset linearly-structured plans by incorporating the flexibility and overlap of processes inherent in effective facility restoration. We discuss three restoration case studies (e.g., the Hart Senate Office Building anthrax restoration, Rocky Flats actinide remediation, and hurricane destruction restoration), that implement aspects of adaptive management but not a formal approach. We propose that more formal adoption of adaptive management principles could be a basis for more flexible standards to improve site-specific remediation plans under conditions of high uncertainty.« less

  5. Developing a programmatic approach to investigating and remediating many unrelated comprehensive environmental response, compensation, and liability act sites at Kelly Air Force Base

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kamp, G.; Regan, P.; Ninesteel, R.

    1988-01-01

    Kelly Air Force Base (AFB), which was founded in 1917, is involved in logistics and maintenance activities supporting the Air Logistics Command. In addition, Kelly AFB hosts over 50 tenant organizations representing the Air Force, Department of Defense, and other government agencies. Over the years waste disposal from this complex was conducted in a manner that led to the identification of over 30 sites to be included in the Installation Restoration Program (IRP) after the Phase 1 investigation. A methodology was needed to prioritize the Remedial Investigations and Feasibility Study (RI/FS) activities for the sites. A Strategy Plan was developedmore » that involved reviewing and interpreting existing data, identifying data voids relative to site specific RI/FS activities, and developing methodology to prioritize activities. Sites were prioritized, and a comprehensive IRP planning document was developed. One data deficiency was revealed -- the lack of understanding of the Basewide hydrogeologic conditions necessary to establish an effective restoration program. A Hydrogeologic Investigation was initiated to provide this data. This data will allow better interpretation of the interaction of the sites, particularly those in close proximity, and improved planning of remediation activities.« less

  6. ANALYTICAL METHOD CHECKLIST FOR VOLATILE ORGANIC COMPOUNDS BY GC/MS (HANDOUT)

    EPA Science Inventory

    The Land Remediation and Pollution Control Division (LRPCD) QA Manager strives to assist LRPCD researchers in developing functional planning documents for their research projects. As part of the planning process, several pieces of information are needed, including information re...

  7. Remedial investigation work plan for Bear Creek Valley Operable Unit 2 (Rust Spoil Area, SY-200 Yard, Spoil Area 1) at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee. Environmental Restoration Program

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1993-05-01

    The enactment of the Resource Conservation and Recovery Act (RCRA) in 1976 and the Hazardous and Solid Waste Amendments (HSWA) to RCRA in 1984 created management requirements for hazardous waste facilities. The facilities within the Oak Ridge Reservation (ORR) were in the process of meeting the RCRA requirements when ORR was placed on the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) National Priorities List (NPL) on November 21, 1989. Under RCRA, the actions typically follow the RCRA Facility Assessment (RFA)/RCRA Facility Investigation (RFI)/Corrective Measures Study (CMS)/Corrective Measures implementation process. Under CERCLA the actions follow the PA/SI/Remedial Investigation (RI)/Feasibility Studymore » (FS)/Remedial Design/Remedial Action process. The development of this document will incorporate requirements under both RCRA and CERCLA into an RI work plan for the characterization of Bear Creek Valley (BCV) Operable Unit (OU) 2.« less

  8. 32 CFR 516.64 - Comprehensive remedies plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 32 National Defense 3 2010-07-01 2010-07-01 true Comprehensive remedies plan. 516.64 Section 516.64 National Defense Department of Defense (Continued) DEPARTMENT OF THE ARMY AID OF CIVIL AUTHORITIES AND PUBLIC RELATIONS LITIGATION Remedies in Procurement Fraud and Corruption § 516.64 Comprehensive...

  9. Rethinking Remediation: A Model to Support the Detailed Diagnosis of Clinicians' Performance Problems and the Development of Effective Remediation Plans.

    PubMed

    Prescott-Clements, Linda; Voller, Vicky; Bell, Mark; Nestors, Natasha; van der Vleuten, Cees P M

    2017-01-01

    The successful remediation of clinicians demonstrating poor performance in the workplace is essential to ensure the provision of safe patient care. Clinicians may develop performance problems for numerous reasons, including health, personal factors, the workplace environment, or outdated knowledge/skills. Performance problems are often complex involving multifactorial issues, encompassing knowledge, skills, and professional behaviors. It is important that (where possible and appropriate) clinicians are supported through effective remediation to return them to safe clinical practice. A review of the literature demonstrated that research into remediation is in its infancy, with little known about the effectiveness of remediation programs currently. Current strategies for the development of remediation programs are mostly "intuitive"; a few draw upon established theories to inform their approach. Similarly, although it has been established that identification of the nature/scope of performance problems through assessment is an essential first step within remediation, the need for a more widespread "diagnosis" of why the problems exist is emerging. These reasons for poor performance, particularly in the context of experienced practicing clinicians, are likely to have an impact on the potential success of remediation and should be considered within the "diagnosis." A new model for diagnosing the performance problems of the clinicians has been developed, using behavioral change theories to explore known barriers to successful remediation, such as insight, motivation, attitude, self-efficacy, and the working environment, in addition to addressing known deficits regarding knowledge and skills. This novel approach is described in this article. An initial feasibility study has demonstrated the acceptability and practical implementation of our model.

  10. NHEERL CONTAMINATED SEDIMENT RESEARCH MULTI-YEAR IMPLEMENTATION PLAN (2005)

    EPA Science Inventory

    ORD has developed a multi-year plan (MYP) called the Contaminated Sites MYP to address the research needs of EPA's Office of Superfund Remediation and Technology Innovation (OSRTI). One of the long-term goals of the Contaminated Sites MYP relates to contaminated sediments, and t...

  11. Identifying and overcoming the constraints that prevent the full implementation of decommissioning and remediation programs in uranium mining sites.

    PubMed

    Franklin, Mariza Ramalho; Fernandes, Horst Monken

    2013-05-01

    Environmental remediation of radioactive contamination is about achieving appropriate reduction of exposures to ionizing radiation. This goal can be achieved by means of isolation or removal of the contamination source(s) or by breaking the exposure pathways. Ideally, environmental remediation is part of the planning phase of any industrial operation with the potential to cause environmental contamination. This concept is even more important in mining operations due to the significant impacts produced. This approach has not been considered in several operations developed in the past. Therefore many legacy sites face the challenge to implement appropriate remediation plans. One of the first barriers to remediation works is the lack of financial resources as environmental issues used to be taken in the past as marginal costs and were not included in the overall budget of the company. This paper analyses the situation of the former uranium production site of Poços de Caldas in Brazil. It is demonstrated that in addition to the lack of resources, other barriers such as the lack of information on site characteristics, appropriate regulatory framework, funding mechanisms, stakeholder involvement, policy and strategy, technical experience and mechanism for the appropriation of adequate technical expertise will play key roles in preventing the implementation of remediation programs. All these barriers are discussed and some solutions are suggested. It is expected that lessons learned from the Poços de Caldas legacy site may stimulate advancement of more sustainable options in the development of future uranium production centers. Copyright © 2011 Elsevier Ltd. All rights reserved.

  12. Evaluating remedial alternatives for an acid mine drainage stream: Application of a reactive transport model

    USGS Publications Warehouse

    Runkel, R.L.; Kimball, B.A.

    2002-01-01

    A reactive transport model based on one-dimensional transport and equilibrium chemistry is applied to synoptic data from an acid mine drainage stream. Model inputs include streamflow estimates based on tracer dilution, inflow chemistry based on synoptic sampling, and equilibrium constants describing acid/base, complexation, precipitation/dissolution, and sorption reactions. The dominant features of observed spatial profiles in pH and metal concentration are reproduced along the 3.5-km study reach by simulating the precipitation of Fe(III) and Al solid phases and the sorption of Cu, As, and Pb onto freshly precipitated iron-(III) oxides. Given this quantitative description of existing conditions, additional simulations are conducted to estimate the streamwater quality that could result from two hypothetical remediation plans. Both remediation plans involve the addition of CaCO3 to raise the pH of a small, acidic inflow from ???2.4 to ???7.0. This pH increase results in a reduced metal load that is routed downstream by the reactive transport model, thereby providing an estimate of post-remediation water quality. The first remediation plan assumes a closed system wherein inflow Fe(II) is not oxidized by the treatment system; under the second remediation plan, an open system is assumed, and Fe(II) is oxidized within the treatment system. Both plans increase instream pH and substantially reduce total and dissolved concentrations of Al, As, Cu, and Fe(II+III) at the terminus of the study reach. Dissolved Pb concentrations are reduced by ???18% under the first remediation plan due to sorption onto iron-(III) oxides within the treatment system and stream channel. In contrast, iron(III) oxides are limiting under the second remediation plan, and removal of dissolved Pb occurs primarily within the treatment system. This limitation results in an increase in dissolved Pb concentrations over existing conditions as additional downstream sources of Pb are not attenuated by sorption.

  13. Radiation Hardened Telerobotic Dismantling System Development Final Report CRADA No. TC-1340-96

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Smith, C.; Lightman, A.

    This project was a collaborative effort between the University of California, LLNL and RedZone Robotics, Inc. for the development of radiation-hardened telerobotic dismantling systems for use in applications such as nuclear facility remediation, nuclear accident response, and Chemobyltype remediation. The project supported the design, development, fabrication and testing of a Ukrainian robotic systems. The project was completed on time and within budget. All deliverables were completed. The final project deliverables were consistent with the plans developed in the original project with the exception that the fabricated systems remained in Ukraine.

  14. Exploring knowledge exchange at the research-policy-practice interface in children's behavioral health services.

    PubMed

    Leslie, Laurel K; Maciolek, Susan; Biebel, Kathleen; Debordes-Jackson, Gifty; Nicholson, Joanne

    2014-11-01

    This case study explored core components of knowledge exchange among researchers, policymakers, and practitioners within the context of the Rosie D. versus Romney class action lawsuit in Massachusetts and the development and implementation of its remedial plan. We identified three distinct, sequential knowledge exchange episodes with different purposes, stakeholders, and knowledge exchanged, as decision-making moved from Federal Medicaid policy to state Medicaid program standards and to community-level practice. The knowledge exchanged included research regarding Wraparound, a key component of the remedial plan, as well as contextual information critical for implementation (e.g., Federal Medicaid policy, managed care requirements, community organizations' characteristics).

  15. Proposed plan for final remedial action for the groundwater operable unit at the chemical plant area of the Weldon Spring Site, Weldon Spring, Missouri.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    2003-08-06

    This Proposed Plan (PP) presents the preferred alternative for addressing contaminated groundwater and springs at the Chemical Plant area of the Weldon Spring site, in Weldon Spring, Missouri. The site is located about 30 mi west of St. Louis, in St. Charles County (Figure 1). This proposed action constitutes the final remedial action for the Weldon Spring site. The residual contamination in groundwater and springs at the Chemical Plant area is the only remaining contamination that needs to be addressed for the site. All other contamination has been addressed by previous remedial actions. After this remedial action is implemented, long-termmore » surveillance and maintenance activities will maintain the effectiveness of all remedial actions conducted at the Weldon Spring site, including this final remedial action for groundwater and springs that is being proposed in this plan. DOE complies with the requirements of the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) in conducting remedial activities at the site. National Environmental Policy Act (NEPA) values have been incorporated into the CERCLA process; that is, the analysis conducted and presented in the remedial investigation/feasibility study (RI/FS) reports included an evaluation of environmental impacts that is comparable to that performed under NEPA. This PP is required under CERCLA to (1) notify the public and present a brief analysis of the remedial action alternatives, (2) identify and present the rationale for the preferred remedial action alternative identified in the PP, (3) summarize key information from the RI/FS evaluations, including the Baseline Risk Assessment (BRA), and (4) inform the public of its role in the remedy selection process and give the public the opportunity to participate in the process. Remediation activities at the Weldon Spring site have been coordinated with the U.S. Environmental Protection Agency (EPA) and the Missouri Department of Natural Resources (MDNR). The EPA has overall oversight and approval authority, with consultation provided by the MDNR. A range of alternatives was considered in identifying the preferred alternative. The alternatives were developed after careful analysis of geological, environmental, and human health and ecological risk data and an evaluation of the effectiveness, implementability, and cost of the various technologies available for groundwater remediation at the Chemical Plant area. Monitored natural attenuation (MNA) coupled with institutional controls (ICs) and contingency activities has been selected as the preferred alternative.« less

  16. Data Management Plan and Functional System Design for the Information Management System of the Clinch River Remedial Investigation and Waste Area Grouping 6

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ball, T.; Brandt, C.; Calfee, J.

    1994-03-01

    The Data Management Plan and Functional System Design supports the Clinch River Remedial Investigation (CRRI) and Waste Area Grouping (WAG) 6 Environmental Monitoring Program. The objective of the Data Management Plan and Functional System Design is to provide organization, integrity, security, traceability, and consistency of the data generated during the CRRI and WAG 6 projects. Proper organization will ensure that the data are consistent with the procedures and requirements of the projects. The Information Management Groups (IMGs) for these two programs face similar challenges and share many common objectives. By teaming together, the IMGs have expedited the development and implementationmore » of a common information management strategy that benefits each program.« less

  17. Site remediation considerations and foundation excavation plan for the Walter Reed Army Institute of Research building, Forest Glen, Maryland

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hambley, D.F.; Harrison, W.; Foster, S.A.

    1991-04-01

    The US Army Corps of Engineers North Atlantic Division, Baltimore District (CENAB), intends to design and construct a medical and dental research facility for the Walter Reed Army Institute of Research (WRAIR) at the Walter Reed Army Medical Center (WRAMC) at Forest Glen, Maryland. Because almost 100% of the proposed building site is located on an uncontrolled landfill that was thought to possibly contain medical, toxic, radioactive, or hazardous waste, it was assumed that remediation of the site might be necessary prior to or in conjunction with excavation. To assess (1) the need for remediation and (2) the potential hazardsmore » to construction workers and the general population, the Baltimore District contracted with Argonne National Laboratory to undertake a site characterization and risk assessment and to develop a foundation-excavation plan. The results of the site characterization and a qualitative risk assessment have been presented in a previous report. This report presents the foundation-excavation plan. 38 refs., 16 figs., 11 tabs.« less

  18. 32 CFR 516.64 - Comprehensive remedies plan.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 32 National Defense 3 2012-07-01 2009-07-01 true Comprehensive remedies plan. 516.64 Section 516.64 National Defense Department of Defense (Continued) DEPARTMENT OF THE ARMY AID OF CIVIL AUTHORITIES... plans should be forwarded with the DFARS 209.406-3 reports. In no case, however, should the report be...

  19. 32 CFR 516.64 - Comprehensive remedies plan.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 32 National Defense 3 2013-07-01 2013-07-01 false Comprehensive remedies plan. 516.64 Section 516.64 National Defense Department of Defense (Continued) DEPARTMENT OF THE ARMY AID OF CIVIL AUTHORITIES... plans should be forwarded with the DFARS 209.406-3 reports. In no case, however, should the report be...

  20. 32 CFR 516.64 - Comprehensive remedies plan.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 32 National Defense 3 2014-07-01 2014-07-01 false Comprehensive remedies plan. 516.64 Section 516.64 National Defense Department of Defense (Continued) DEPARTMENT OF THE ARMY AID OF CIVIL AUTHORITIES... plans should be forwarded with the DFARS 209.406-3 reports. In no case, however, should the report be...

  1. 32 CFR 516.64 - Comprehensive remedies plan.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 32 National Defense 3 2011-07-01 2009-07-01 true Comprehensive remedies plan. 516.64 Section 516.64 National Defense Department of Defense (Continued) DEPARTMENT OF THE ARMY AID OF CIVIL AUTHORITIES... plans should be forwarded with the DFARS 209.406-3 reports. In no case, however, should the report be...

  2. Mathematical Modelling of Bacterial Populations in Bio-remediation Processes

    NASA Astrophysics Data System (ADS)

    Vasiliadou, Ioanna A.; Vayenas, Dimitris V.; Chrysikopoulos, Constantinos V.

    2011-09-01

    An understanding of bacterial behaviour concerns many field applications, such as the enhancement of water, wastewater and subsurface bio-remediation, the prevention of environmental pollution and the protection of human health. Numerous microorganisms have been identified to be able to degrade chemical pollutants, thus, a variety of bacteria are known that can be used in bio-remediation processes. In this study the development of mathematical models capable of describing bacterial behaviour considered in bio-augmentation plans, such as bacterial growth, consumption of nutrients, removal of pollutants, bacterial transport and attachment in porous media, is presented. The mathematical models may be used as a guide in designing and assessing the conditions under which areas contaminated with pollutants can be better remediated.

  3. Proposed RCRA Permit Decision for CNMI Remedial Action Plan

    EPA Pesticide Factsheets

    EPA requesting public comment on its proposed Remedial Action Plan permit decision for the detonation unit and storage cave located at Marpi Point, Saipan, approximately 1 mile north of the new Marpi Landfill.

  4. 76 FR 6327 - Restricted Area, Potomac River, Marine Corps Base Quantico, Quantico, VA

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-04

    ... public health by preventing vessels from disturbing a planned environmental remediation area that is... planned environmental remediation area that is located to the northeast of MCAF. The proposed rule was...

  5. 24 CFR 3282.409 - Contents of plan.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... DEVELOPMENT MANUFACTURED HOME PROCEDURAL AND ENFORCEMENT REGULATIONS Consumer Complaint Handling and Remedial... statement informing the owner that the owner may submit a complaint to the SAA or Secretary if the owner...

  6. Remedial action plan and site design for stabilization of the inactive uranium mill tailings sites at Rifle, Colorado

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1992-02-01

    This appendix assesses the present conditions and data gathered about the two inactive uranium mill tailings sites near Rifle, Colorado, and the designated disposal site six miles north of Rifle in the area of Estes Gulch. It consolidates available engineering, radiological, geotechnical, hydrological, meteorological, and other information pertinent to the design of the Remedial Action Plan (RAP). The data characterize conditions at the mill, tailings, and disposal site so that the Remedial Action Contractor (RAC) may complete final designs for the remedial actions.

  7. Superfund record of decision (EPA Region 3): Ohio River Park Site, Operable Unit 3, Neville Island, PA, September 17, 1998

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1998-10-01

    This Record of Decision (ROD) presents the selected remedial action plan for the Ohio River Park Superfund Site (the Site) in Allegheny County, Pennsylvania. The remedial action plan in this document is presented as the permanent remedy for controlling the groundwater at the Site. This remedy is comprised of: monitoring of natural attenuation processes to measure changes in contaminant concentrations in groundwater plume at the Site until the cleanup levels are achieved; deed restriction preventing residential use of groundwater at the Site.

  8. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    This Remedial Investigation (RI) Work Plan has been developed as part of the US Department of Energy`s (DOE`s) investigation of the Groundwater Operable Unit (GWOU) at Oak Ridge National Laboratory (ORNL) located near Oak Ridge, Tennessee. The first iteration of the GWOU RI Work Plan is intended to serve as a strategy document to guide the ORNL GWOU RI. The Work Plan provides a rationale and organization for groundwater data acquisition, monitoring, and remedial actions to be performed during implementation of environmental restoration activities associated with the ORNL GWOU. It Is important to note that the RI Work Plan formore » the ORNL GWOU is not a prototypical work plan. The RI will be conducted using annual work plans to manage the work activities, and task reports will be used to document the results of the investigations. Sampling and analysis results will be compiled and reported annually with a review of data relative to risk (screening level risk assessment review) for groundwater. This Work Plan outlines the overall strategy for the RI and defines tasks which are to be conducted during the initial phase of investigation. This plan is presented with the understanding that more specific addenda to the plan will follow.« less

  9. Remedial investigation/feasibility study for the David Witherspoon, Inc., 901 Site, Knoxville, Tennessee: Volume 1

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1996-10-01

    This remedial investigation (RI)/feasibility study (FS) supports the selection of remedial actions for the David Witherspoon, Inc. 901 Maryville Pike Site in Knoxville, Tennessee. Operations at the site, used as a recycling center, have resulted in past, present, and potential future releases of hazardous substances in to the environment. This Site is a Tennessee Superfund site. A phased approach was planned to (1) gather existing data from previous investigations managed by the Tenn. Dept. of Environment and Conservation; (2) perform a preliminary RI, including risk assessments, and an FS with existing data to identify areas where remedial action may bemore » necessary; (3) gather additional field data to adequately define the nature and extent of risk-based contaminants that present identifiable threats to human and/or ecological receptors; and (4) develop remedial action alternatives to reduce risks to acceptable levels.« less

  10. Integrated planning and spatial evaluation of megasite remediation and reuse options

    NASA Astrophysics Data System (ADS)

    Schädler, Sebastian; Morio, Maximilian; Bartke, Stephan; Finkel, Michael

    2012-01-01

    Redevelopment of large contaminated brownfields (megasites) is often hampered by a lack of communication and harmonization among diverse stakeholders with potentially conflicting interests. Decision support is required to provide integrative yet transparent evaluation of often complex spatial information to stakeholders with different areas of expertise. It is considered crucial for successful redevelopment to identify a shared vision of how the respective contaminated site could be remediated and redeveloped. We describe a framework of assessment methods and models that analyzes and visualizes site- and land use-specific spatial information at the screening level, with the aim to support the derivation of recommendable land use layouts and to initiate further and more detailed planning. The framework integrates a GIS-based identification of areas to be remediated, an estimation of associated clean-up costs, a spatially explicit market value appraisal, and an assessment of the planned future land use's contribution to sustainable urban and regional development. Case study results show that derived options are potentially favorable in both a sustainability and an economic sense and that iterative re-planning is facilitated by the evaluation and visualization of economic, ecological and socio-economic aspects. The framework supports an efficient early judgment about whether and how abandoned land may be assigned a sustainable and marketable land use.

  11. Malicious Activity Simulation Tool (MAST) and Trust

    DTIC Science & Technology

    2015-06-01

    application through discovery and remediation of flaws. B. DESIGN AND DEVELOPMENT CONSIDERATIONS Design and development focuses on the actual...protection of the backup and restoration of the application. COBR -1 X V-16846 The IAO will ensure a disaster recovery plan exists in accordance

  12. 40 CFR Appendix II to Part 92 - Interpretive Ruling for § 92.705-Remedial Plans

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... nonconformity of any such vehicles or engines. The plan shall provide that the manufacturer will remedy, at the manufacturer's expense, all properly maintained and used vehicles which experienced the nonconformity during...

  13. Field sampling and analysis plan for the remedial investigation of Waste Area Grouping 2 at Oak Ridge National Laboratory, Oak Ridge, Tennessee. Environmental Restoration Program

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Boston, H.L.; Ashwood, T.L.; Borders, D.M.

    1992-02-01

    This field sampling and analysis (S & A) plan has been developed as part of the Department of Energy`s (DOE`s) remedial investigation (RI) of Waste Area Grouping (WAG) 2 at Oak Ridge National Laboratory (ORNL) located in Oak Ridge, Tennessee. The S & A plan has been written in support of the remedial investigation (RI) plan for WAG 2 (ORNL 1990). WAG 2 consists of White Oak Creek (WOC) and its tributaries downstream of the ORNL main plant area, White Oak Lake (WOL), White Oak Creek embayment (WOCE) on the Clinch River, and the associated floodplain and subsurface environment (Fig.more » 1.1). The WOC system is the surface drainage for the major ORNL WAGs and has been exposed to a diversity of contaminants from operations and waste disposal activities in the WOC watershed. WAG 2 acts as a conduit through which hydrologic fluxes carry contaminants from upgradient areas to the Clinch River. Water, sediment, soil, and biota in WAG 2 are contaminated and continue to receive contaminants from upgradient WAGs. This document describes the following: an overview of the RI plan, background information for the WAG 2 system, and objectives of the S & A plan; the scope and implementation of the first 2 years of effort of the S & A plan and includes recent information about contaminants of concern, organization of S & A activities, interactions with other programs, and quality assurance specific to the S & A activities; provides details of the field sampling plans for sediment, surface water, groundwater, and biota, respectively; and describes the sample tracking and records management plan.« less

  14. Remedial Design/Remedial Action Work Plan for Operable Units 6-05 and 10-04, Phase IV

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    R. P. Wells

    2006-11-14

    This Phase IV Remedial Design/Remedial Action Work Plan addresses the remediation of areas with the potential for UXO at the Idaho National Laboratory. These areas include portions of the Naval Proving Ground, the Arco High-Altitude Bombing Range, and the Twin Buttes Bombing Range. Five areas within the Naval Proving Ground that are known to contain UXO include the Naval Ordnance Disposal Area, the Mass Detonation Area, the Experimental Field Station, The Rail Car Explosion Area, and the Land Mine Fuze Burn Area. The Phase IV remedial action will be concentrated in these five areas. For other areas, such as themore » Arco High-Altitude Bombing Range and the Twin Buttes Bombing Range, ordnance has largely consisted of sand-filled practice bombs that do not pose an explosion risk. Ordnance encountered in these areas will be addressed under the Phase I Operations and Maintenance Plan that allows for the recovery and disposal of ordnance that poses an imminent risk to human health or the environment.« less

  15. In situ gas treatment technology demonstration test plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Thornton, E.C.; Miller, R.D.

    1996-02-16

    This document defines the objectives and requirements associated with undertaking a field demonstration of an in situ gas treatment appoach to remediation chromate-contaminated soil. The major tasks presented in this plan include the design and development of the surface gas treatment system, performance of permitting activities, and completion of site preparation and field testing activities.

  16. Application of natural resource valuation concepts for development of sustainable remediation plans for groundwater.

    PubMed

    Connor, John A; Paquette, Shawn; McHugh, Thomas; Gie, Elaine; Hemingway, Mark; Bianchi, Gino

    2017-12-15

    This paper explores the application of natural resource assessment and valuation procedures as a tool for developing groundwater remediation strategies that achieve the objectives for health and environmental protection, in balance with considerations of economic viability and conservation of natural resources. The natural resource assessment process, as applied under U.S. and international guidelines, entails characterization of groundwater contamination in terms of the pre-existing beneficial services of the impacted resource, the loss of these services caused by the contamination, and the measures and associated costs necessary to restore or replace the lost services. Under many regulatory programs, groundwater remediation objectives assume that the impacted groundwater may be used as a primary source of drinking water in the future, even if not presently in use. In combination with a regulatory preference for removal or treatment technologies, this assumed exposure, while protective of human health, can drive the remedy selection process toward remedies that may not be protective of the groundwater resource itself or of the other natural resources (energy, materials, chemicals, etc.) that may be consumed in the remediation effort. To achieve the same health and environmental protection goals under a sustainable remediation framework, natural resource assessment methods can be applied to restore the lost services and preserve the intact services of the groundwater so as to protect both current and future users of that resource. In this paper, we provide practical guidelines for use of natural resource assessment procedures in the remedy selection process and present a case study demonstrating the use of these protocols for development of sustainable remediation strategies. Copyright © 2017 The Authors. Published by Elsevier Ltd.. All rights reserved.

  17. 76 FR 51266 - National Oil and Hazardous Substances Pollution Contingency Plan; National Priorities List...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-18

    ... which was selected in the ROD. The SDs hired M&S Ingenieria y Ciencia Asociados who prepared remedial... approved the Remedial Action Work Plan and M&S Ingenieria y Ciencia Asociados as the Settling Defendants...

  18. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Brown, Geoffrey Wayne; Leonard, Philip; Hartline, Ernest Leon

    High Explosives and Technology (M-7) completed the second round of formulation and testing of Remediated Nitrate Salt (RNS) surrogates on March 17, 2016. This report summarizes the results of the work and also includes additional documentation required under test plan PLAN-TA9-2443 Rev B, "Remediated Nitrate Salt (RNS) Surrogate Formulation and Testing Standard Procedure", released February 16, 2016. All formulation and testing was carried out according to PLAN-TA9-2443 Rev B. Results from the first round of formulation and testing were documented in memorandum M7-16-6042, "Results from First Round of Remediated Nitrate Salt Surrogate Formulation and Testing."

  19. Developing Health-Based Pre-Planning Clearance Goals for Airport Remediation Following Chemical Terrorist Attack: Introduction and Key Assessment Considerations

    PubMed Central

    Watson, Annetta; Hall, Linda; Raber, Ellen; Hauschild, Veronique D.; Dolislager, Fredrick; Love, Adam H.; Hanna, M. Leslie

    2011-01-01

    In the event of a chemical terrorist attack on a transportation hub, post-event remediation and restoration activities necessary to attain unrestricted facility reuse and re-entry could require hours to multiple days. While restoration timeframes are dependent on numerous variables, a primary controlling factor is the level of pre-planning and decision-making completed prior to chemical terrorist release. What follows is the first of a two-part analysis identifying key considerations, critical information, and decision criteria to facilitate post-attack and post-decontamination consequence management activities. A conceptual site model and human health-based exposure guidelines are developed and reported as an aid to site-specific pre-planning in the current absence of U.S. state or Federal values designated as compound-specific remediation or re-entry concentrations, and to safely expedite facility recovery to full operational status. Chemicals of concern include chemical warfare nerve and vesicant agents and the toxic industrial compounds phosgene, hydrogen cyanide, and cyanogen chloride. This work has been performed as a national case study conducted in partnership with the Los Angeles International Airport and The Bradley International Terminal. All recommended guidelines have been selected for consistency with airport scenario release parameters of a one-time, short-duration, finite airborne release from a single source followed by compound-specific decontamination. PMID:21390292

  20. Developing Health-Based Pre-Planning Clearance Goals for Airport Remediation Following Chemical Terrorist Attack: Introduction and Key Assessment Considerations.

    PubMed

    Watson, Annetta; Hall, Linda; Raber, Ellen; Hauschild, Veronique D; Dolislager, Fredrick; Love, Adam H; Hanna, M Leslie

    2011-02-13

    In the event of a chemical terrorist attack on a transportation hub, post-event remediation and restoration activities necessary to attain unrestricted facility reuse and re-entry could require hours to multiple days. While restoration timeframes are dependent on numerous variables, a primary controlling factor is the level of pre-planning and decision-making completed prior to chemical terrorist release. What follows is the first of a two-part analysis identifying key considerations, critical information, and decision criteria to facilitate post-attack and post-decontamination consequence management activities. A conceptual site model and human health-based exposure guidelines are developed and reported as an aid to site-specific pre-planning in the current absence of U.S. state or Federal values designated as compound-specific remediation or re-entry concentrations, and to safely expedite facility recovery to full operational status. Chemicals of concern include chemical warfare nerve and vesicant agents and the toxic industrial compounds phosgene, hydrogen cyanide, and cyanogen chloride. This work has been performed as a national case study conducted in partnership with the Los Angeles International Airport and The Bradley International Terminal. All recommended guidelines have been selected for consistency with airport scenario release parameters of a one-time, short-duration, finite airborne release from a single source followed by compound-specific decontamination.

  1. Remedial action plan and site design for stabilization of the inactive uranium mill tailings sites at Rifle, Colorado. Volume 2, Appendices D and E: Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1992-02-01

    This appendix assesses the present conditions and data gathered about the two inactive uranium mill tailings sites near Rifle, Colorado, and the designated disposal site six miles north of Rifle in the area of Estes Gulch. It consolidates available engineering, radiological, geotechnical, hydrological, meteorological, and other information pertinent to the design of the Remedial Action Plan (RAP). The data characterize conditions at the mill, tailings, and disposal site so that the Remedial Action Contractor (RAC) may complete final designs for the remedial actions.

  2. 48 CFR 2009.570-10 - Remedies.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 6 2011-10-01 2011-10-01 false Remedies. 2009.570-10... ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Organizational Conflicts of Interest 2009.570-10 Remedies. In addition to other remedies permitted by law or contract for a breach of the restrictions in this subpart or...

  3. 48 CFR 2009.570-10 - Remedies.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Remedies. 2009.570-10... ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Organizational Conflicts of Interest 2009.570-10 Remedies. In addition to other remedies permitted by law or contract for a breach of the restrictions in this subpart or...

  4. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Metzler, D.; Gibb, J.P.; Glover, W.A.

    Compliance with the mandate of the Uranium Mill Tailings Radiation Control Act (UMTRCA) at Uranium Mill Tailings Remedial Action (UMTRA) Project sites requires implementation of a groundwater remedial action plan that meets the requirements of Subpart B of the US Environmental Protection Agency`s proposed groundwater protection standards (40 CFR 192). The UMTRA Groundwater Project will ensure that unacceptable current risk or potential risk to the public health, safety and the environment resulting from the groundwater contamination attributable to the UMTRA sites, is mitigated in a timely and cost-efficient manner. For each UMTRA processing site and vicinity property where contamination exists,more » a groundwater remedial action plan must be developed that identifies hazardous constituents and establishes acceptable concentration limits for the hazardous constituents as either (a) alternate concentration limits (ACL), (b) maximum concentration limits (MCLs), (c) supplemental standards, or (d) background groundwater quality levels. Project optimization is a strategy that will aggressively work within the current regulatory framework using all available options to meet regulatory requirements. This strategy is outlined within.« less

  5. Community resiliency through recovery resource supply chain planning.

    PubMed

    Franklin, Charlotte; Todt, Kiersten

    2014-01-01

    Information in this paper is the result of recommendations and remedies developed at 'Local Supply Chain Capacity in a Crisis Summit Exercise' held in Arlington, VA on 30th-31st January,2013. At the event, which was funded through the Regional Catastrophic Preparedness Grant Program, national private sector and not-for-profit essential resource provider experts in sectors such as transportation, communication systems, energy/power, financial resources, medical supplies and other vital supplies, together with emergency managers, discussed best practices, major challenges and exchanged remedy recommendations.

  6. Handling the difficult Brownfields issues: A case study of privately funded remediation to residential standards update 1997

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    McLeod, D.P.; Ridley, A.P.

    Most Brownfields projects are based on either direct or indirect government funding. This paper describes a more unusual scenario: the remediation of a contaminated industrial site for re-use as residential property. Using the ASTM RBCA risk assessment methodology and an innovative fixed fee arrangement between Woodward-Clyde Consultants and the site owner, they developed and successfully implemented a plan to clean up the site to residential standards over a twelve (12) month time period.

  7. DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    In the Bear Creek Valley Watershed Remedial Investigation, the Boneyard/Burnyard was identified as the source of the largest releases of uranium into groundwater and surface water in Bear Creek Valley. The proposed action for remediation of this site is selective excavation and removal of source material and capping of the remainder of the site. The schedule for this action has been accelerated so that this is the first remedial action planned to be implemented in the Bear Creek Valley Record of Decision. Additional data needs to support design of the remedial action were identified at a data quality objectives meetingmore » held for this project. Sampling at the Boneyard/Burnyard will be conducted through the use of a phased approach. Initial or primary samples will be used to make in-the-field decisions about where to locate follow-up or secondary samples. On the basis of the results of surface water, soil, and groundwater analysis, up to six test pits will be dug. The test pits will be used to provide detailed descriptions of source materials and bulk samples. This document sets forth the requirements and procedures to protect the personnel involved in this project. This document also contains the health and safety plan, quality assurance project plan, waste management plan, data management plan, implementation plan, and best management practices plan for this project as appendices.« less

  8. Comprehensive Assessment of Struggling Learners Referred to a Graduate Medical Education Remediation Program.

    PubMed

    Warburton, Karen M; Goren, Eric; Dine, C Jessica

    2017-12-01

    Implementation of the Next Accreditation System has provided a standardized framework for identifying learners not meeting milestones, but there is as yet no corresponding framework for remediation. We developed a comprehensive assessment process that allows correct diagnosis of a struggling learner's deficit(s) to promote successful remediation. At the University of Pennsylvania, resident learners within the Department of Medicine who are not meeting milestones are referred to the Early Intervention Remediation Committee (EIRC). The EIRC, composed of 14 faculty members with expertise in remediation, uses a standardized process to assess learners' deficits. These faculty members categorize primary deficits as follows: medical knowledge, clinical reasoning, organization and efficiency, professionalism, and communication skills. The standardized process of assessment includes an analysis of the learner's file, direct communication with evaluators, an interview focused on learner perception of the problem, screening for underlying medical or psychosocial issues, and a review of systems for deficits in the 6 core competencies. Participants were surveyed after participating in this process. Over a 2-year period, the EIRC assessed and developed remediation plans for 4% of learners (14 of a total 342). Following remediation and reassessment, the identified problems were satisfactorily resolved in all cases with no disciplinary action. While the process was time intensive, an average of 45 hours per learner, the majority of faculty and residents rated it as positive and beneficial. This structured assessment process identifies targeted areas for remediation and adds to the tools available to Clinical Competency Committees.

  9. An integrated systems-based approach to mercury research and technology development

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Peterson, Mark J; Brooks, Scott C; Mathews, Teresa J

    A 3-year strategic planning process was undertaken in Oak Ridge, Tennessee, to develop a research and technology development approach that can help guide mercury remediation in East Fork Poplar Creek (EFPC). Mercury remediation is a high priority for the US Department of Energy s (DOE s) Oak Ridge Office of Environmental Management because of large historical losses of mercury to the environment at the Y-12 National Security Complex (Y-12). Because of the extent of mercury losses and the complexities of mercury transport and fate in the stream environment, the success of conventional options for mercury remediation in the downstream sectionsmore » of EFPC is uncertain. The overall Oak Ridge mercury remediation strategy focuses on mercury treatment actions at Y-12 in the short-term and research and technology development to evaluate longer-term solutions in the downstream environment. The technology development strategy is consistent with a phased, adaptive management paradigm and DOE s Technology Readiness Level guidelines. That is, early evaluation includes literature review, site characterization, and small-scale studies of a broad number of potential technologies. As more information is gathered, technologies that may have the most promise and potential remediation benefit will be chosen for more extensive and larger-scale pilot testing before being considered for remedial implementation. Field and laboratory research in EFPC is providing an improved level of understanding of mercury transport and fate processes in EFPC that will inform the development of site-specific remedial technologies. Technology development has centered on developing strategies that can mitigate the primary factors affecting mercury risks in the stream: (1) the amount of inorganic mercury available to the stream system, (2) the conversion of inorganic mercury to methylmercury, and (3) the bioaccumulation of methylmercury through the food web. Given the downstream complexities and interdependencies between sources and processes in EFPC, no one task or approach is likely to solve the mercury problem in the creek, thus highlighting the importance of using an integrated, systems-based approach to develop remedial solutions.« less

  10. Integrated planning and spatial evaluation of megasite remediation and reuse options.

    PubMed

    Schädler, Sebastian; Morio, Maximilian; Bartke, Stephan; Finkel, Michael

    2012-01-01

    Redevelopment of large contaminated brownfields (megasites) is often hampered by a lack of communication and harmonization among diverse stakeholders with potentially conflicting interests. Decision support is required to provide integrative yet transparent evaluation of often complex spatial information to stakeholders with different areas of expertise. It is considered crucial for successful redevelopment to identify a shared vision of how the respective contaminated site could be remediated and redeveloped. We describe a framework of assessment methods and models that analyzes and visualizes site- and land use-specific spatial information at the screening level, with the aim to support the derivation of recommendable land use layouts and to initiate further and more detailed planning. The framework integrates a GIS-based identification of areas to be remediated, an estimation of associated clean-up costs, a spatially explicit market value appraisal, and an assessment of the planned future land use's contribution to sustainable urban and regional development. Case study results show that derived options are potentially favorable in both a sustainability and an economic sense and that iterative re-planning is facilitated by the evaluation and visualization of economic, ecological and socio-economic aspects. The framework supports an efficient early judgment about whether and how abandoned land may be assigned a sustainable and marketable land use. Copyright © 2011 Elsevier B.V. All rights reserved.

  11. 40 CFR 92.705 - Remedial plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... POLLUTION FROM LOCOMOTIVES AND LOCOMOTIVE ENGINES Recall Regulations § 92.705 Remedial plan. (a) When any... adequate supply of parts will be available to initiate the repair campaign, the percentage of the total... intact. (3) The label shall contain: (i) The recall campaign number; and (ii) A code designating the...

  12. Interim Action Proposed Plan for the Chemicals, Metals, and Pesticides (CMP) Pits Operable Unit

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bradley, J.

    2002-06-18

    The purpose of this Interim Action Proposed Plan (IAPP) is to describe the preferred interim remedial action for addressing the Chemicals, Metals, and Pesticides (CMP) Pits Operable Unit and to provide an opportunity for public input into the remedial action selection process.

  13. March 2016 Memo: Planning for Removal and Remedial Activities at Hardrock Mining and Mineral Processing Sites with Fluid Hazards

    EPA Pesticide Factsheets

    Memo from EPA Assistant Administrator Mathy Stanislaus, regarding planning for removal and remedial activities at hardrock mining and mineral processing sites with fluid hazards, and to share the Agency’s expectations for the work that is done at these sit

  14. 40 CFR 209.9 - Contents of a remedial plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... by the remedial order, including the category and/or configuration if applicable, and the make, model year and model number, if applicable. (2) A detailed description of the present location of the... the respondent. (5) A detailed account of the costs of implementing each of the proposed plans. (b...

  15. 49 CFR 27.11 - Remedial action, voluntary action and compliance planning.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 1 2010-10-01 2010-10-01 false Remedial action, voluntary action and compliance planning. 27.11 Section 27.11 Transportation Office of the Secretary of Transportation NONDISCRIMINATION ON THE BASIS OF DISABILITY IN PROGRAMS OR ACTIVITIES RECEIVING FEDERAL FINANCIAL ASSISTANCE General § 27...

  16. 40 CFR 85.1802 - Notice to manufacturer of nonconformity; submission of Remedial Plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 18 2010-07-01 2010-07-01 false Notice to manufacturer of nonconformity; submission of Remedial Plan. 85.1802 Section 85.1802 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) CONTROL OF AIR POLLUTION FROM MOBILE SOURCES Recall...

  17. Factors associated with clinical skill remediation in dental hygiene education programs.

    PubMed

    Wood, Donna F; Mitchell, Tanya Villalpando; Holt, Lorie A; Branson, Bonnie G

    2014-02-01

    The purpose of this study was to examine the challenges related to formal clinical remediation in dental hygiene programs, which include timing of student identification, policy development, and the issues of methodology and scheduling. A 23 item investigator-designed survey was electronically distributed to all 303 U.S. entry-level dental hygiene program directors. This questionnaire included 23 forced-choice questions with the options to add comments to 8 of the questions. A total of 111 surveys were returned yielding a response rate of 36%. Descriptive statistics and Chi-square analyses were utilized to analyze relationships between responses and the degree earned from the dental hygiene program. All schools reported having a remediation policy; however, 13.6% of the respondents revealed this information was not readily available to students. The majority of respondents (67.8%) reported identifying students with clinical deficiencies in the preclinical semester, and 15.5% identified students in the second year, second clinical semester. Instrumentation technique was identified as the area in greatest need of remediation (81%), followed by critical thinking and problem solving skills (12%). Coordination of faculty and student schedules to conduct remediation was identified as one of the greatest challenges by respondents (25.2%). Results of this study suggest that challenges exist with the process of remediation. Some of these challenges include involving the student in remedial plan development, the academic consequences associated with remediation and scheduling time and space for remedial activities. These findings indicate that respondents are well aware of the need for remediation policies in dental hygiene programs. The point in time varies when students in need of remediation are identified. Therefore, further research needs to be conducted to determine the reasons for this difference. Some reasons may include inability to grasp the foundational skills and/or the complexity of advanced instrumentation in the second year. Also, it is suggested that investigation regarding methods used to address the challenge of faculty and student scheduling for remediation sessions would be useful.

  18. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Brown, Geoffrey Wayne; Leonard, Philip; Hartline, Ernest Leon

    High Explosives Science and Technology (M-7) completed all required formulation and testing of Remediated Nitrate Salt (RNS) surrogates on April 27, 2016 as specified in PLAN-TA9-2443 Rev B, "Remediated Nitrate Salt (RNS) Surrogate Formulation and Testing Standard Procedure", released February 16, 2016. This report summarizes the results of the work and also includes additional documentation required in that test plan. All formulation and testing was carried out according to PLAN-TA9-2443 Rev B. The work was carried out in three rounds, with the full matrix of samples formulated and tested in each round. Results from the first round of formulation andmore » testing were documented in memorandum M7-J6-6042, " Results from First Round of Remediated Nitrate Salt Surrogate Formulation and Testing." Results from the second round of formulation and testing were documented in M7-16-6053 , "Results from the Second Round of Remediated Nitrate Salt Surrogate Formulation and Testing." Initial results from the third round were documented in M7-16-6057, "Initial Results from the Third Round of Remediated Nitrate Salt Formulation and Testing."« less

  19. United States Air Force 611th Air Support Group Civil Engineering Squadron, Elmendorf AFB, Alaska. Remedial investigation and feasibility study Point Lay Radar Installation, Alaska. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Karmi, S.

    1996-03-04

    The United States Air Force (Air Force) has prepared this Remedial Investigation/Feasibility Study (RI/FS) report to present the results of RI/FS activities at four sites located at the Point Lay radar installation. The remedial investigation (RI) field activities were conducted at the Point Lay radar installation during the summer of 1993. The four sites at Point Lay were investigated because they were suspected of being contaminated with hazardous substances. RI activities were conducted using methods and procedures specified in the RI/FS Work Plan, Sampling and Analysis Plan (SAP), and Health and Safety Plan.

  20. Site Characterization Report (Building 202). Volume 2. Appendicies A-H.

    DTIC Science & Technology

    1996-04-01

    Bionetics,Groundwater and Wells, Environmental Science and Engineering, Inc., Installation Assessment of ERADCOM Activities, Environmental Science and...Engineering, Inc., Plan for the Assessment of Contamination at Woodbridge Research Facility, Environmental Science and Engineering, Inc., Remedial...Action Plan for the Woodbridge Research Facility PCB Disposal Site, Environmental Science and Engineering, Inc., Remedial Investigation and

  1. Sustainable Community Case Study: An Assessment of EPA’s Sustainable Development Plan for Stella, Missouri

    EPA Science Inventory

    In 2006, citizens of Stella, Missouri asked the EPA for technical assistance in demolition and site remediation of an abandoned hospital; and how to redevelop the site to help the community be more sustainable. EPA Region 7 teamed with EPA Office of Research and Development (ORD...

  2. Basic Skills and Job Retention. Final Report.

    ERIC Educational Resources Information Center

    Seminole Community Coll., Sanford, FL.

    A project developed an educational model to deliver academic remediation services to small businesses at a cost-effective rate by using a lead instructor and volunteer assistants. The first step was planning and implementing the tutor training segment. The class and accompanying manual were developed, and tutors were identified and trained in a…

  3. 3D simulation as a tool for improving the safety culture during remediation work at Andreeva Bay.

    PubMed

    Chizhov, K; Sneve, M K; Szőke, I; Mazur, I; Mark, N K; Kudrin, I; Shandala, N; Simakov, A; Smith, G M; Krasnoschekov, A; Kosnikov, A; Kemsky, I; Kryuchkov, V

    2014-12-01

    Andreeva Bay in northwest Russia hosts one of the former coastal technical bases of the Northern Fleet. Currently, this base is designated as the Andreeva Bay branch of Northwest Center for Radioactive Waste Management (SevRAO) and is a site of temporary storage (STS) for spent nuclear fuel (SNF) and other radiological waste generated during the operation and decommissioning of nuclear submarines and ships. According to an integrated expert evaluation, this site is the most dangerous nuclear facility in northwest Russia. Environmental rehabilitation of the site is currently in progress and is supported by strong international collaboration. This paper describes how the optimization principle (ALARA) has been adopted during the planning of remediation work at the Andreeva Bay STS and how Russian-Norwegian collaboration greatly contributed to ensuring the development and maintenance of a high level safety culture during this process. More specifically, this paper describes how integration of a system, specifically designed for improving the radiological safety of workers during the remediation work at Andreeva Bay, was developed in Russia. It also outlines the 3D radiological simulation and virtual reality based systems developed in Norway that have greatly facilitated effective implementation of the ALARA principle, through supporting radiological characterisation, work planning and optimization, decision making, communication between teams and with the authorities and training of field operators.

  4. Addendum to the East Tennessee Technology Park Site-Wide Residual Contamination Remedial Investigation Work Plan Oak Ridge, Tennessee

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    SAIC

    2011-04-01

    The East Tennessee Technology Park Site-Wide Residual Contamination Remedial Investigation Work Plan (DOE 2004) describes the planned fieldwork to support the remedial investigation (RI) for residual contamination at the East Tennessee Technology Park (ETTP) not addressed in previous Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA) decisions. This Addendum describes activities that will be conducted to gather additional information in Zone 1 of the ETTP for groundwater, surface water, and sediments. This Addendum has been developed from agreements reached in meetings held on June 23, 2010, August 25, 2010, October 13, 2010, November 13, 2010, December 1, 2010,more » and January 13, 2011, with representatives of the U. S. Department of Energy (DOE), U. S. Environmental Protection Agency (EPA), and Tennessee Department of Environment and Conservation (TDEC). Based on historical to recent groundwater data for ETTP and the previously completed Sitewide Remedial Investigation for the ETTP (DOE 2007a), the following six areas of concern have been identified that exhibit groundwater contamination downgradient of these areas above state of Tennessee and EPA drinking water maximum contaminant levels (MCLs): (1) K-720 Fly Ash Pile, (2) K-770 Scrap Yard, (3) Duct Island, (4) K-1085 Firehouse Burn/J.A. Jones Maintenance Area, (5) Contractor's Spoil Area (CSA), and (6) Former K-1070-A Burial Ground. The paper presents a brief summary of the history of the areas, the general conceptual models for the observed groundwater contamination, and the data gaps identified.« less

  5. SMART GUIDANCE AS A TOOL FOR PLANNING AND DECISION MAKING

    EPA Science Inventory

    The United States Environmental Protection Agency (EPA) and the German Federal Ministry of Education and Research (BMBF) created a Bilateral Working Group in 1990 to gain a better understanding of each country's efforts in developing and demonstrating remedial technologies (Phase...

  6. SMART GUIDANCE AS A TOOL FOR PLANNING AND DECISION MAKING (ABSTRACT)

    EPA Science Inventory

    The United States Environmental Protection Agency (EPA) and the German Federal Ministry of Education and Research (BMBF) created a Bilateral Working Group in 1990 to gain a better understanding of each country's efforts in developing and demonstrating remedial technologies (Phase...

  7. [Design of a plan for patient safety in pediatric surgery service].

    PubMed

    Paredes Esteban, R M; Castillo Fernández, A L; Miñarro del Moral, R; Garrido Pérez, J I; Granero Cendón, R; Gómez Beltrán, O; Berenguer Garcia, M J; Tejedor Fernández, M

    2014-10-01

    Patient safety is a key priority in quality management for healthcare services providers. Every patient is entitled to receive safe and effective healthcare. The aim of this study was to design a patient safety plan for a Paediatric Surgery Department. We carried out a literature review and we established a work group that included healthcare professionals from the Paediatric Surgery Department and the Quality and Medical Records Department. The group identified potential adverse events, failures and causes and established a rating using Failure Mode Effects Analysis. Potential risks were mapped out and a plan was designed establishing actions to reduce risks. We designated leaders to ensure the effective implementation of the plan. A total of 58 adverse events were identified in the Paediatric Surgery Department. We detected 128 failures that were produced by 211 different causes. The group developed a proposal with 424 specific measures to carry out preventive and/or remedial actions that were then narrowed down to 322. The group designed a plan to apply the programme, which is currently being implemented. The methodology used enabled obtaining key information for improvement of patient safety and developing preventive and/or remedial actions. These measures are applicable in practice, as they were designed using proposals and agreements with professionals that take active part in the care of children with surgical conditions.

  8. Behavioral Approaches to the Assessment and Remediation of Academic Problems.

    ERIC Educational Resources Information Center

    Lentz, Francis E., Jr.

    There has been an increasing call for school psychologists to spend time collecting data that are functionally related to the planning of academic interventions. In order to identify the problem and plan for remediation, data must be taken that bear directly on the child's academic problems in the classroom and the curricular sequences actually…

  9. 48 CFR 8.406-3 - Remedies for nonconformance.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Remedies for nonconformance. 8.406-3 Section 8.406-3 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION ACQUISITION PLANNING REQUIRED SOURCES OF SUPPLIES AND SERVICES Federal Supply Schedules 8.406-3 Remedies for...

  10. 40 CFR 270.230 - May I perform remediation waste management activities under a RAP at a location removed from the...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 26 2010-07-01 2010-07-01 false May I perform remediation waste management activities under a RAP at a location removed from the area where the remediation wastes originated... Plans (RAPs) Obtaining A Rap for An Off-Site Location § 270.230 May I perform remediation waste...

  11. Optimal design of groundwater remediation system using a probabilistic multi-objective fast harmony search algorithm under uncertainty

    NASA Astrophysics Data System (ADS)

    Luo, Qiankun; Wu, Jianfeng; Yang, Yun; Qian, Jiazhong; Wu, Jichun

    2014-11-01

    This study develops a new probabilistic multi-objective fast harmony search algorithm (PMOFHS) for optimal design of groundwater remediation systems under uncertainty associated with the hydraulic conductivity (K) of aquifers. The PMOFHS integrates the previously developed deterministic multi-objective optimization method, namely multi-objective fast harmony search algorithm (MOFHS) with a probabilistic sorting technique to search for Pareto-optimal solutions to multi-objective optimization problems in a noisy hydrogeological environment arising from insufficient K data. The PMOFHS is then coupled with the commonly used flow and transport codes, MODFLOW and MT3DMS, to identify the optimal design of groundwater remediation systems for a two-dimensional hypothetical test problem and a three-dimensional Indiana field application involving two objectives: (i) minimization of the total remediation cost through the engineering planning horizon, and (ii) minimization of the mass remaining in the aquifer at the end of the operational period, whereby the pump-and-treat (PAT) technology is used to clean up contaminated groundwater. Also, Monte Carlo (MC) analysis is employed to evaluate the effectiveness of the proposed methodology. Comprehensive analysis indicates that the proposed PMOFHS can find Pareto-optimal solutions with low variability and high reliability and is a potentially effective tool for optimizing multi-objective groundwater remediation problems under uncertainty.

  12. Possible Applications of Soil Remediation Technologies in Latvia

    NASA Astrophysics Data System (ADS)

    Burlakovs, Juris; Vircavs, Magnuss

    2011-01-01

    Increasing public concern about deleterious effects of contamination on the environment and human health has led to legislative actions aimed at controlling and regulating the emission of potential contaminants into the environment, but there is still a plethora of territories historically contaminated with different contaminants within the territory of Latvia. The purpose of the present study is to give an overview of the formerly and presently contaminated areas and give some recommendations for remediation. 242 first category contaminated territories (the contamination exceeds the acceptable normative 10 times or more) are mentioned in the National Register of Contaminated Territories, a lot of them are known as contaminated with hazardous contaminants such as heavy metals, oil products, organic compounds and other contaminants in different amounts and concentrations. An overview of soil contamination in Latvia is provided, the planned and recommended research, as well as the planned remediation in pilot case studies, are described, giving a review of the historical contamination situation and of applications of the planned remediation technologies.

  13. China's soil and groundwater management challenges: Lessons from the UK's experience and opportunities for China.

    PubMed

    Coulon, Frédéric; Jones, Kevin; Li, Hong; Hu, Qing; Gao, Jingyang; Li, Fasheng; Chen, Mengfang; Zhu, Yong-Guan; Liu, Rongxia; Liu, Ming; Canning, Kate; Harries, Nicola; Bardos, Paul; Nathanail, Paul; Sweeney, Rob; Middleton, David; Charnley, Maggie; Randall, Jeremy; Richell, Martin; Howard, Trevor; Martin, Ian; Spooner, Simon; Weeks, Jason; Cave, Mark; Yu, Fang; Zhang, Fang; Jiang, Ying; Longhurst, Phil; Prpich, George; Bewley, Richard; Abra, Jonathan; Pollard, Simon

    2016-05-01

    There are a number of specific opportunities for UK and China to work together on contaminated land management issues as China lacks comprehensive and systematic planning for sustainable risk based land management, encompassing both contaminated soil and groundwater and recycling and reuse of soil. It also lacks comprehensive risk assessment systems, structures to support risk management decision making, processes for verification of remediation outcome, systems for record keeping and preservation and integration of contamination issues into land use planning, along with procedures for ensuring effective health and safety considerations during remediation projects, and effective evaluation of costs versus benefits and overall sustainability. A consequence of the absence of these overarching frameworks has been that remediation takes place on an ad hoc basis. At a specific site management level, China lacks capabilities in site investigation and consequent risk assessment systems, in particular related to conceptual modelling and risk evaluation. There is also a lack of shared experience of practical deployment of remediation technologies in China, analogous to the situation before the establishment of the independent, non-profit organisation CL:AIRE (Contaminated Land: Applications In Real Environments) in 1999 in the UK. Many local technology developments are at lab-scale or pilot-scale stage without being widely put into use. Therefore, a shared endeavour is needed to promote the development of technically and scientifically sound land management as well as soil and human health protection to improve the sustainability of the rapid urbanisation in China. Copyright © 2016 Elsevier Ltd. All rights reserved.

  14. The CHPRC Groundwater and Technical Integration Support (Master Project) Quality Assurance Management Plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Fix, N. J.

    The scope of the CH2M Hill Plateau Remediation Company, LLC (CHPRC) Groundwater and Technical Integration Support (Master Project) is for Pacific Northwest National Laboratory staff to provide technical and integration support to CHPRC. This work includes conducting investigations at the 300-FF-5 Operable Unit and other groundwater operable units, and providing strategic integration, technical integration and assessments, remediation decision support, and science and technology. The projects under this Master Project will be defined and included within the Master Project throughout the fiscal year, and will be incorporated into the Master Project Plan. This Quality Assurance Management Plan provides the quality assurancemore » requirements and processes that will be followed by the CHPRC Groundwater and Technical Integration Support (Master Project) and all releases associated with the CHPRC Soil and Groundwater Remediation Project. The plan is designed to be used exclusively by project staff.« less

  15. 78 FR 49993 - National Oil and Hazardous Substances Pollution Contingency Plan; National Priorities List...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-16

    ....regulations.gov : Follow online instructions for submitting comments. Email: Nefertiti DiCosmo, Remedial... [email protected] . Fax: Gladys Beard at (312) 697-2077. Mail: Nefertiti DiCosmo, Remedial Project... FURTHER INFORMATION CONTACT: Nefertiti DiCosmo, Remedial Project Manager, U.S. Environmental Protection...

  16. 77 FR 64790 - National Oil and Hazardous Substances Pollution Contingency Plan; National Priorities List...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-23

    ... DiCosmo, Remedial Project Manager, at [email protected] or David Novak, Community Involvement...: Nefertiti DiCosmo, Remedial Project Manager, U.S. Environmental Protection Agency (SR-6J), 77 West Jackson... FURTHER INFORMATION CONTACT: Nefertiti DiCosmo, Remedial Project Manager, U.S. Environmental Protection...

  17. 78 FR 49939 - National Oil and Hazardous Substances Pollution Contingency Plan; National Priorities List...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-16

    ... : Follow online instructions for submitting comments. Email: Nefertiti DiCosmo, Remedial Project Manager... . Fax: Gladys Beard at (312) 697-2077. Mail: Nefertiti DiCosmo, Remedial Project Manager, U.S... FURTHER INFORMATION CONTACT: Nefertiti DiCosmo, Remedial Project Manager, U.S. Environmental Protection...

  18. Error Analysis and Remedial Teaching.

    ERIC Educational Resources Information Center

    Corder, S. Pit

    The purpose of this paper is to analyze the role of error analysis in specifying and planning remedial treatment in second language learning. Part 1 discusses situations that demand remedial action. This is a quantitative assessment that requires measurement of the varying degrees of disparity between the learner's knowledge and the demands of the…

  19. Mold Remediation in Schools and Commercial Buildings.

    ERIC Educational Resources Information Center

    Environmental Protection Agency, Washington, DC. Office of Radiation and Indoor Air.

    This document describes how to investigate and evaluate moisture and mold problems in educational facilities, and presents the key steps for implementing a remediation plan. A checklist is provided for conducting mold remediation efforts along with a resource list of helpful organizations and governmental agencies. Appendices contain a glossary,…

  20. 75 FR 9202 - Pacific Gas & Electric Company; Notice of Availability of Final Environmental Assessment

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-01

    ... Assessment (FEA) regarding Pacific Gas & Electric Company's (PG&E) proposal to perform seismic remediation..., in the San Joaquin River Basin. The FEA analyzes the environmental effects of the seismic remediation... environmental effects. The FEA concludes that the proposed seismic remediation and resource plans, with the...

  1. PLANNING SUSTAINABLE DEVELOPMENT - 20 FEBRUARY 2007 - 1300 HOURS

    EPA Science Inventory

    Although the mission of the Environmental Protection Agency is to protect the environment, our historic response has been to remediate the environment because we failed to protect it. Because land-use decisions can have a huge impact on the environment, this presentation poses to...

  2. Federal Lands Highway Project Development and Design Manual - June 1996 Metric Revision

    DOT National Transportation Integrated Search

    1978-05-01

    The experiment is planned for low-volume rural intersections on or near the Maine Facility. A number of remedial aids, both active and dynamic, are tested. The devices are designed either to focus the motorist's attention on existing conditions or to...

  3. Tank waste remediation system systems engineering management plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Peck, L.G.

    1998-01-08

    This Systems Engineering Management Plan (SEMP) describes the Tank Waste Remediation System (TWRS) implementation of the US Department of Energy (DOE) systems engineering policy provided in 97-IMSD-193. The SEMP defines the products, process, organization, and procedures used by the TWRS Project to implement the policy. The SEMP will be used as the basis for tailoring the systems engineering applications to the development of the physical systems and processes necessary to achieve the desired end states of the program. It is a living document that will be revised as necessary to reflect changes in systems engineering guidance as the program evolves.more » The US Department of Energy-Headquarters has issued program management guidance, DOE Order 430. 1, Life Cycle Asset Management, and associated Good Practice Guides that include substantial systems engineering guidance.« less

  4. DOE Office of Scientific and Technical Information (OSTI.GOV)

    KIRKBRIDE, R.A.

    The Tank Waste Remediation System Operation and Utilization Plan updates the operating scenario and plans for the delivery of feed to BNFL Inc., retrieval of waste from single-shell tanks, and the overall process flowsheets for Phases I and II of the privatization of the Tank Waste Remediation System. The plans and flowsheets are updated with the most recent tank-by-tank inventory and sludge washing data. Sensitivity cases were run to evaluate the impact or benefits of proposed changes to the BNFL Inc. contract and to evaluate a risk-based SST retrieval strategy.

  5. 40 CFR Appendix A to Subpart S of... - Interpretive Ruling for § 85.1803-Remedial Plans

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ...—Remedial Plans The purpose of this rule is to set forth EPA's interpretation regarding one aspect of a... Clean Air Act, 42 U.S.C. 7641(c)(1). This rule will provide guidance to vehicle and engine manufacturers... conform to the regulations prescribed under section 202 when in actual use throughout their useful lives...

  6. WAG 2 remedial investigation and site investigation site-specific work plan/health and safety checklist for the soil and sediment task. Environmental Restoration Program

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Holt, V.L.; Burgoa, B.B.

    1993-12-01

    This document is a site-specific work plan/health and safety checklist (WP/HSC) for a task of the Waste Area Grouping 2 Remedial Investigation and Site Investigation (WAG 2 RI&SI). Title 29 CFR Part 1910.120 requires that a health and safety program plan that includes site- and task-specific information be completed to ensure conformance with health- and safety-related requirements. To meet this requirement, the health and safety program plan for each WAG 2 RI&SI field task must include (1) the general health and safety program plan for all WAG 2 RI&SI field activities and (2) a WP/HSC for that particular field task.more » These two components, along with all applicable referenced procedures, must be kept together at the work site and distributed to field personnel as required. The general health and safety program plan is the Health and Safety Plan for the Remedial Investigation and Site Investigation of Waste Area Grouping 2 at the Oak Ridge National Laboratory, Oak Ridge, Tennessee (ORNL/ER-169). The WP/HSCs are being issued as supplements to ORNL/ER-169.« less

  7. Developing Health-Based Pre-Planning Clearance Goals for Airport Remediation Following a Chemical Terrorist Attack: Decision Criteria for Multipathway Exposure Routes

    PubMed Central

    Watson, Annetta; Dolislager, Fredrick; Hall, Linda; Raber, Ellen; Hauschild, Veronique D.; Love, Adam H.

    2011-01-01

    In the event of a chemical terrorist attack on a transportation hub, post-event remediation and restoration activities necessary to attain unrestricted facility re-use and re-entry could require hours to multiple days. While timeframes are dependent on numerous variables, a primary controlling factor is the level of pre-planning and decision-making completed prior to chemical release. What follows is the second of a two-part analysis identifying key considerations, critical information and decision criteria to facilitate post-attack and post-decontamination consequence management activities. Decision criteria analysis presented here provides first-time, open-literature documentation of multi-pathway, health-based remediation exposure guidelines for selected toxic industrial compounds, chemical warfare agents, and agent degradation products for pre-planning application in anticipation of a chemical terrorist attack. Guideline values are provided for inhalation and direct ocular vapor exposure routes as well as percutaneous vapor, surface contact, and ingestion. Target populations include various employees as well as transit passengers. This work has been performed as a national case study conducted in partnership with the Los Angeles International Airport and The Bradley International Terminal. All recommended guidelines have been selected for consistency with airport scenario release parameters of a one-time, short-duration, finite airborne release from a single source followed by compound-specific decontamination. PMID:21399674

  8. Developing health-based pre-planning clearance goals for airport remediation following a chemical terrorist attack: Decision criteria for multipathway exposure routes

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Watson, Annetta Paule; Dolislager, Frederick; Hall, Dr. Linda

    2011-01-01

    In the event of a chemical terrorist attack on a transportation hub, post-event remediation and restoration activities necessary to attain unrestricted facility re-use and re-entry could require hours to multiple days. While timeframes are dependent on numerous variables, a primary controlling factor is the level of pre-planning and decision-making completed prior to chemical release. What follows is the second of a two-part analysis identifying key considerations, critical information and decision criteria to facilitate post-attack and post-decontamination consequence management activities. Decision criteria analysis presented here provides first-time, open-literature documentation of multi-pathway, health-based remediation exposure guidelines for selected toxic industrial compounds, chemicalmore » warfare agents, and agent degradation products for pre-planning application in anticipation of a chemical terrorist attack. Guideline values are provided for inhalation and direct ocular vapor exposure routes as well as percutaneous vapor, surface contact, and ingestion. Target populations include various employees as well as transit passengers. This work has been performed as a national case study conducted in partnership with the Los Angeles International Airport and The Bradley International Terminal. All recommended guidelines have been selected for consistency with airport scenario release parameters of a one-time, short-duration, finite airborne release from a single source followed by compound-specific decontamination.« less

  9. Development of a probabilistic PCB-bioaccumulation model for six fish species in the Hudson River

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Stackelberg, K. von; Menzie, C.

    1995-12-31

    In 1984 the US Environmental Protection Agency (USEPA) completed a Feasibility Study on the Hudson River that investigated remedial alternatives and issued a Record of Decision (ROD) later that year. In December 1989 USEPA decided to reassess the No Action decision for Hudson River sediments. This reassessment consists of three phases: Interim Characterization and Evaluation (Phase 1); Further Site Characterization and Analysis (Phase 2); and, Feasibility study (Phase 3). A Phase 1 report was completed in August, 1991. The team then completed a Final Work Plan for Phase 2 in September 1992. This work plan identified various PCB fate andmore » transport modeling activities to support the Hudson River PCB Reassessment Remedial Investigation and Feasibility Study (RI/FS). This talk provides a description of the development of a Probabilistic bioaccumulation models to describe the uptake of PCBs on a congener-specific basis in six fish species. The authors have developed a framework for relating body burdens of PCBs in fish to exposure concentrations in Hudson River water and sediments. This framework is used to understand historical and current relationships as well as to predict fish body burdens for future conditions under specific remediation and no action scenarios. The framework incorporates a probabilistic approach to predict distributions in PCB body burdens for selected fish species. These models can predict single population statistics such as the average expected values of PCBs under specific scenarios as well as the distribution of expected concentrations.« less

  10. Tanks focus area multiyear program plan FY97-FY99

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1996-08-01

    The U.S. Department of Energy (DOE) continues to face a major tank remediation problem with approximately 332 tanks storing over 378,000 ml of high-level waste (HLW) and transuranic (TRU) waste across the DOE complex. Most of the tanks have significantly exceeded their life spans. Approximately 90 tanks across the DOE complex are known or assumed to have leaked. Some of the tank contents are potentially explosive. These tanks must be remediated and made safe. How- ever, regulatory drivers are more ambitious than baseline technologies and budgets will support. Therefore, the Tanks Focus Area (TFA) began operation in October 1994. Themore » focus area manages, coordinates, and leverages technology development to provide integrated solutions to remediate problems that will accelerate safe and cost-effective cleanup and closure of DOE`s national tank system. The TFA is responsible for technology development to support DOE`s four major tank sites: Hanford Site (Washington), INEL (Idaho), Oak Ridge Reservation (ORR) (Tennessee), and Savannah River Site (SRS) (South Carolina). Its technical scope covers the major functions that comprise a complete tank remediation system: safety, characterization, retrieval, pretreatment, immobilization, and closure.« less

  11. Evaluation of SWAT for estimating ET in irrigated and dryland cropping systems in the Texas High Plains

    USDA-ARS?s Scientific Manuscript database

    Hydrologic models such as SWAT are used extensively for predicting water availability and water quality responses to alternative management practices. Modeling results have been used by regulatory agencies for developing remedial measures for impaired water bodies and for water planning purposes. Ho...

  12. Developing health-based pre-planning clearance goals for airport remediation following chemical terrorist attack: Introduction and key assessment considerations

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Watson, Annetta Paule; Raber, Ellen; Dolislager, Frederick

    2011-01-01

    In the event of a chemical terrorist attack on a transportation hub, post-event remediation and restoration activities necessary to attain unrestricted facility re-use and re-entry could require hours to multiple days. While restoration timeframes are dependent on numerous variables, a primary controlling factor is the level of pre-planning and decision-making completed prior to chemical terrorist release. What follows is the first of a two-part analysis identifying key considerations, critical information, and decision criteria to facilitate post-attack and post-decontamination consequence management activities. A conceptual site model and human health-based exposure guidelines are developed and reported as an aid to site-specific pre-planningmore » in the current absence of U.S. state or Federal values designated as compound-specific remediation or re-entry concentrations, and to safely expedite facility recovery to full operational status. Chemicals of concern include chemical warfare nerve and vesicant agents and the toxic industrial compounds phosgene, hydrogen cyanide, and cyanogen chloride. This work has been performed as a national case study conducted in partnership with the Los Angeles International Airport and The Bradley International Terminal. All recommended guidelines have been selected for consistency with airport scenario release parameters of a one-time, short-duration, finite airborne release from a single source followed by compound-specific decontamination.« less

  13. Generation of 3-D surface maps in waste storage silos using a structured light source

    NASA Technical Reports Server (NTRS)

    Burks, B. L.; Rowe, J. C.; Dinkins, M. A.; Christensen, B.; Selleck, C.; Jacoboski, D.; Markus, R.

    1992-01-01

    Surface contours inside the large waste storage tanks typical of the Department of Energy (DOE) complex are, in general, highly irregular. In addition to pipes and other pieces of equipment in the tanks, the surfaces may have features such as mounds, fissures, crystalline structures, and mixed solid and liquid forms. Prior to remediation activities, it will be necessary to characterize the waste to determine the most effective remediation approaches. Surface contour data will be required both prior to and during remediation. The use is described of a structured light source to generate 3-D surface contour maps of the interior of waste storage silos at the Feed Materials Production Center at Fernald, OH. The landscape inside these large waste storage tanks bears a strong resemblance to some of the landscapes that might be encountered during lunar or planetary exploration. Hence, these terrestrial 3-D mapping techniques may be directly applicable to extraterrestrial exploration. In further development, it will be demonstrated that these 3-D data can be used for robotic task planning just as 3-D surface contour data of a satellite could be used to plan maintenance tasks for a space-based servicing robot.

  14. The Columbia River Protection Supplemental Technologies Quality Assurance Project Plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Fix, N. J.

    Pacific Northwest National Laboratory researchers are working on the Columbia River Protection Supplemental Technologies Project. This project is a U. S. Department of Energy, Office of Environmental Management-funded initiative designed to develop new methods, strategies, and technologies for characterizing, modeling, remediating, and monitoring soils and groundwater contaminated with metals, radionuclides, and chlorinated organics. This Quality Assurance Project Plan provides the quality assurance requirements and processes that will be followed by the Technologies Project staff.

  15. The Soils and Groundwater – EM-20 S&T Roadmap Quality Assurance Project Plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Fix, N. J.

    The Soils and Groundwater – EM-20 Science and Technology Roadmap Project is a U.S. Department of Energy, Office of Environmental Management-funded initiative designed to develop new methods, strategies and technology for characterizing, modeling, remediating, and monitoring soils and groundwater contaminated with metals, radionuclides, and chlorinated organics. This Quality Assurance Project Plan provides the quality assurance requirements and processes that will be followed by EM-20 Roadmap Project staff.

  16. Supporting evaluation for the proposed plan for final remedial action for the groundwater operable unit at the chemical plant area of the Weldon Spring Site, Weldon Spring, Missouri.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    2003-08-06

    This report presents the technical information developed since the interim record of decision (IROD) was issued in September 2000 (U.S. Department of Energy [DOE] 2000). The information was incorporated into the evaluation that was performed in selecting the preferred alternative for the Chemical Plant groundwater operable unit (GWOU) of the Weldon Spring site. The contaminants of concern (COCs) in groundwater and springs are trichloroethylene (TCE), nitrate, uranium, and nitroaromatic compounds. The preferred alternative of monitored natural attenuation (MNA) coupled with institutional controls (ICs) and contingency activities is described in the ''Proposed Plan (PP) for Final Remedial Action for the Groundwatermore » Operable Unit at the Chemical Plant Area of the Weldon Spring Site, Weldon Spring, Missouri'' (DOE 2003b).« less

  17. Configuration management plan for waste tank farms and the 242-A evaporator of tank waste remediation system

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Laney, T.

    The configuration management architecture presented in this Configuration Management Plan is based on the functional model established by DOE-STD-1073-93, ``Guide for Operational Configuration Management Program.`` The DOE Standard defines the configuration management program by the five basic program elements of ``program management,`` ``design requirements,`` ``document control,`` ``change control,`` and ``assessments,`` and the two adjunct recovery programs of ``design reconstitution,`` and ``material condition and aging management.`` The CM model of five elements and two adjunct programs strengthen the necessary technical and administrative control to establish and maintain a consistent technical relationship among the requirements, physical configuration, and documentation. Although the DOEmore » Standard was originally developed for the operational phase of nuclear facilities, this plan has the flexibility to be adapted and applied to all life-cycle phases of both nuclear and non-nuclear facilities. The configuration management criteria presented in this plan endorses the DOE Standard and has been tailored specifically to address the technical relationship of requirements, physical configuration, and documentation during the full life cycle of the Waste Tank Farms and 242-A Evaporator of Tank Waste Remediation System.« less

  18. Wide-area decontamination in an urban environment after radiological dispersion: A review and perspectives.

    PubMed

    Kaminski, Michael D; Lee, Sang Don; Magnuson, Matthew

    2016-03-15

    Nuclear or radiological terrorism in the form of uncontrolled radioactive contamination presents a unique challenge in the field of nuclear decontamination. Potential targets require an immediate decontamination response, or mitigation plan to limit the social and economic impact. To date, experience with urban decontamination of building materials - specifically hard, porous, external surfaces - is limited to nuclear weapon fallout and nuclear reactor accidents. Methods are lacking for performing wide-area decontamination in an urban environment so that in all release scenarios the area may be re-occupied without evaluation and/or restriction. Also lacking is experience in developing mitigation strategies, that is, methods of mitigating contamination and its resultant radiation dose in key areas during the immediate aftermath of an event and after lifesaving operations. To date, the tremendous strategy development effort primarily by the European community has focused on the recovery phase, which extends years beyond the release event. In this review, we summarize the methods and data collected over the past 70 years in the field of hard, external surface decontamination of radionuclide contaminations, with emphasis on methods suitable for response to radiological dispersal devices and their potentially unique physico-chemical characteristics. This review concludes that although a tremendous amount of work has been completed primarily by the European Community (EU) and the United Kingdom (UK), the few studies existing on each technique permit only very preliminary estimates of decontamination factors for various building materials and methods and extrapolation of those values for use in environments outside the EU and UK. This data shortage prevents us from developing an effective and detailed mitigation response plan and remediation effort. Perhaps most importantly, while the data available does include valuable information on the practical aspects of performing the various remediation methods including costs, coverage rates, manpower, pitfalls, etc., it lacks the details on lessons learned, best practices, and standard procedures, for instance, that would be required to develop a mitigation strategy. While the urban decontamination problem is difficult and there is much more research to do, the existing literature provides a framework for a response plan. Using this framework, in conjunction with computer modeling and relevant data collection, can lead to development of appropriate plans and exercises that would permit development of a mitigation and remediation response. Copyright © 2015 Elsevier B.V. All rights reserved.

  19. 300 Area process trench sediment analysis report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Zimmerman, M.G.; Kossik, C.D.

    1987-12-01

    This report describes the results of a sampling program for the sediments underlying the Process Trenches serving the 300 Area on the Hanford reservation. These Process Trenches were the subject of a Closure Plan submitted to the Washington State Department of Ecology and to the US Environmental Protection Agency in lieu of a Part B permit application on November 8, 1985. The closure plan described a proposed sampling plan for the underlying sediments and potential remedial actions to be determined by the sample analyses results. The results and proposed remedial action plan are presented and discussed in this report. 50more » refs., 6 figs., 8 tabs.« less

  20. No Further Remedial Action Planned Decision Document for Site 3.

    DTIC Science & Technology

    1998-04-01

    INSTALLATION RESTORATION PROGRAM No FURTHER REMEDIAL ACTION PLANNED DECISION DOCUMENT FOR SITE 3 FINAL MICHIGAN AIR NATIONAL GUARD ALPENA ...COMBAT READINESS TRAINING CENTER ALPENA , MICHIGAN April 1998 Air National Guard Andrews AFB, Maryland &nc QUALITY IMSmm«^ 19980519 204 XA REPORT...Document for Site 3 at Alpena CRTC, Alpena , MI. 6. AUTHOR(S) N/A 5. FUNDING NUMBERS 7. PERFORMING ORGANIZATION NAME(S) AND ADDRESS(ES) Montgomery

  1. Idaho National Laboratory Test Area North: Application of Endpoints to Guide Adaptive Remediation at a Complex Site: INL Test Area North: Application of Endpoints

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lee, M. Hope; Truex, Mike; Freshley, Mark

    Complex sites are defined as those with difficult subsurface access, deep and/or thick zones of contamination, large areal extent, subsurface heterogeneities that limit the effectiveness of remediation, or where long-term remedies are needed to address contamination (e.g., because of long-term sources or large extent). The Test Area North at the Idaho National Laboratory, developed for nuclear fuel operations and heavy metal manufacturing, is used as a case study. Liquid wastes and sludge from experimental facilities were disposed in an injection well, which contaminated the subsurface aquifer located deep within fractured basalt. The wastes included organic, inorganic, and low-level radioactive constituents,more » with the focus of this case study on trichloroethylene. The site is used as an example of a systems-based framework that provides a structured approach to regulatory processes established for remediation under existing regulations. The framework is intended to facilitate remedy decisions and implementation at complex sites where restoration may be uncertain, require long timeframes, or involve use of adaptive management approaches. The framework facilitates site, regulator, and stakeholder interactions during the remedial planning and implementation process by using a conceptual model description as a technical foundation for decisions, identifying endpoints, which are interim remediation targets or intermediate decision points on the path to an ultimate end, and maintaining protectiveness during the remediation process. At the Test Area North, using a structured approach to implementing concepts in the endpoint framework, a three-component remedy is largely functioning as intended and is projected to meet remedial action objectives by 2095 as required. The remedy approach is being adjusted as new data become available. The framework provides a structured process for evaluating and adjusting the remediation approach, allowing site owners, regulators, and stakeholders to manage contamination at complex sites where adaptive remedies are needed.« less

  2. Summary Document: Restoration Plan for Major Airports after a Bioterrorist Attack

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Raber, E

    2007-01-11

    This document provides general guidelines for developing a Restoration Plan for a major airport following release of a biological warfare agent. San Francisco International Airport was selected as the example airport during development of the Plan to illustrate specific details. The spore forming bacterium Bacillus anthracis was selected as the biological agent of primary concern because it is the most difficult of known bioterrorism agents to inactivate and is considered to be one of the agents most likely to be used as a biological weapon. The focus of the Plan is on activities associated with the Characterization, Remediation, and Clearancemore » Phases that are defined herein. Activities associated with the Notification and First-Response Phases are briefly discussed in Appendixes A and B, respectively. In addition to the main text of this Plan and associated appendixes, a data supplement was developed specifically for San Francisco International Airport. Requests for the data supplement must be made directly to the Emergency Planning Operations Division of San Francisco International Airport.« less

  3. High altitude mine waste remediation -- Implementation of the Idarado remedial action plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hardy, A.J.; Redmond, J.V.; River, R.A.

    1999-07-01

    The Idarado Mine in Colorado's San Juan Mountains includes 11 tailing areas, numerous waste rock dumps, and a large number of underground openings connected by over 100 miles of raises and drifts. The tailings and mine wastes were generated from different mining and milling operations between 1975 and 1978. the Idarado Remedial Action Plan (RAP) was an innovative 5-year program developed for remediating the impacts of historic mining activities in the San Miguel River and Red Mountain Creek drainages. The challenges during implementation included seasonal access limitations due to the high altitude construction areas, high volumes of runoff during snowmore » melt, numerous abandoned underground openings and stopped-out veins, and high profile sites adjacent to busy jeep trails and a major ski resort town. Implementation of the RAP has included pioneering efforts in engineering design and construction of remedial measures. Innovative engineering designs included direct revegetation techniques for the stabilization of tailings piles, concrete cutoff walls and French drains to control subsurface flows, underground water controls that included pipelines, weeplines, and portal collection systems, and various underground structures to collect and divert subsurface flows often exceeding 2,000 gpm. Remote work locations have also required the use of innovative construction techniques such as heavy lift helicopters to move construction materials to mines above 10,000 feet. This paper describes the 5-year implementation program which has included over 1,000,000 cubic yards of tailing regrading, application of 5,000 tons of manure and 26,000 tons of limestone, and construction of over 10,000 feet of pipeline and approximately 45,000 feet of diversion channel.« less

  4. System configuration management plan for 101-SY Hydrogen Mitigation Test Project Mini-Data Acquisition and Control System of Tank Waste Remediation System

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Vargo, G.F. Jr.

    1994-10-11

    The DOE Standard defines the configuration management program by the five basic program elements of ``program management,`` ``design requirements,`` ``document control,`` ``change control,`` and ``assessments,`` and the two adjunct recovery programs of ``design reconstitution,`` and ``material condition and aging management. The C-M model of five elements and two adjunct programs strengthen the necessary technical and administrative control to establish and maintain a consistent technical relationship among the requirements, physical configuration, and documentation. Although the DOE Standard was originally developed for the operational phase of nuclear facilities, this plan has the flexibility to be adapted and applied to all life-cycle phasesmore » of both nuclear and non-nuclear facilities. The configuration management criteria presented in this plan endorses the DOE Standard and has been tailored specifically to address the technical relationship of requirements, physical configuration, and documentation during the full life-cycle of the 101-SY Hydrogen Mitigation Test Project Mini-Data Acquisition and Control System of Tank Waste Remediation System.« less

  5. Tank waste remediation system privatization infrastructure program, configuration management implementation plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Schaus, P.S.

    This Configuration Management Implementation Plan (CMIP) was developed to assist in managing systems, structures, and components (SSCS), to facilitate the effective control and statusing of changes to SSCS, and to ensure technical consistency between design, performance, and operational requirements. Its purpose is to describe the approach Privatization Infrastructure will take in implementing a configuration management program, to identify the Program`s products that need configuration management control, to determine the rigor of control, and to identify the mechanisms for that control.

  6. INVESTIGATING CAUSES OF BIOLOGICAL IMPAIRMENTS IN AQUATIC SYSTEMS: A PLAN FOR DEVELOPMENT OF THE CAUSAL ANALYSIS/DIAGNOSIS DECISION

    EPA Science Inventory

    Increasingly, the regulatory, remedial and restoration actions taken to manage impaired environments are based on measurement and analysis of the biotic community. When an aquatic community has been identified as impaired, the cause of the impairment must be determined so that a...

  7. 75 FR 53264 - United States Marine Corps, Marine Corps Base Quantico, Quantico VA; Restricted Area

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-31

    ... environmental remediation area located in the vicinity of MCAF. The restricted area will extend approximately... from disturbing a planned environmental remediation area located in the vicinity of MCAF. The...

  8. Development of monitoring and diagnostic methods for robots used in remediation of waste sites. 1997 annual progress report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Tecza, J.

    1998-06-01

    'Safe and efficient clean up of hazardous and radioactive waste sites throughout the DOE complex will require extensive use of robots. This research effort focuses on developing Monitoring and Diagnostic (M and D) methods for robots that will provide early detection, isolation, and tracking of impending faults before they result in serious failure. The utility and effectiveness of applying M and D methods to hydraulic robots has never been proven. The present research program is utilizing seeded faults in a laboratory test rig that is representative of an existing hydraulically-powered remediation robot. This report summarizes activity conducted in the firstmore » 9 months of the project. The research team has analyzed the Rosie Mobile Worksystem as a representative hydraulic robot, developed a test rig for implanted fault testing, developed a test plan and agenda, and established methods for acquiring and analyzing the test data.'« less

  9. Stakeholder value-linked sustainability assessment: Evaluating remedial alternatives for the Portland Harbor Superfund Site, Portland, Oregon, USA.

    PubMed

    Apitz, Sabine E; Fitzpatrick, Anne G; McNally, Amanda; Harrison, David; Coughlin, Conor; Edwards, Deborah A

    2018-01-01

    Regulatory decisions on remediation should consider affected communities' needs and values, and how these might be impacted by remedial options; this process requires that diverse stakeholders are able to engage in a transparent consideration of value trade-offs and of the distribution of risks and benefits associated with remedial actions and outcomes. The Stakeholder Values Assessment (SVA) tool was developed to evaluate remedial impacts on environmental quality, economic viability, and social equity in the context of stakeholder values and priorities. Stakeholder values were linked to the pillars of sustainability and also to a range of metrics to evaluate how sediment remediation affects these values. Sediment remedial alternatives proposed by the US Environmental Protection Agency (USEPA) for the Portland Harbor Superfund Site were scored for each metric, based upon data provided in published feasibility study (FS) documents. Metric scores were aggregated to generate scores for each value; these were then aggregated to generate scores for each pillar of sustainability. In parallel, the inferred priorities (in terms of regional remediation, restoration, planning, and development) of diverse stakeholder groups (SGs) were used to evaluate the sensitivity and robustness of the values-based sustainability assessment to diverse SG priorities. This approach, which addresses social indicators of impact and then integrates them with indicators of environmental and economic impacts, goes well beyond the Comprehensive Environmental Response, Compensation and Liability Act's (CERCLA) 9 criteria for evaluating remedial alternatives because it evaluates how remedial alternatives might be ranked in terms of the diverse values and priorities of stakeholders. This approach identified trade-offs and points of potential contention, providing a systematic, semiquantitative, transparent valuation tool that can be used in community engagement. Integr Environ Assess Manag 2018;14:43-62. © 2017 The Authors. Integrated Environmental Assessment and Management published by Wiley Periodicals, Inc. on behalf of Society of Environmental Toxicology & Chemistry (SETAC). © 2017 The Authors. Integrated Environmental Assessment and Management published by Wiley Periodicals, Inc. on behalf of Society of Environmental Toxicology & Chemistry (SETAC).

  10. Periodic Application of Stochastic Cost Optimization Methodology to Achieve Remediation Objectives with Minimized Life Cycle Cost

    NASA Astrophysics Data System (ADS)

    Kim, U.; Parker, J.

    2016-12-01

    Many dense non-aqueous phase liquid (DNAPL) contaminated sites in the U.S. are reported as "remediation in progress" (RIP). However, the cost to complete (CTC) remediation at these sites is highly uncertain and in many cases, the current remediation plan may need to be modified or replaced to achieve remediation objectives. This study evaluates the effectiveness of iterative stochastic cost optimization that incorporates new field data for periodic parameter recalibration to incrementally reduce prediction uncertainty and implement remediation design modifications as needed to minimize the life cycle cost (i.e., CTC). This systematic approach, using the Stochastic Cost Optimization Toolkit (SCOToolkit), enables early identification and correction of problems to stay on track for completion while minimizing the expected (i.e., probability-weighted average) CTC. This study considers a hypothetical site involving multiple DNAPL sources in an unconfined aquifer using thermal treatment for source reduction and electron donor injection for dissolved plume control. The initial design is based on stochastic optimization using model parameters and their joint uncertainty based on calibration to site characterization data. The model is periodically recalibrated using new monitoring data and performance data for the operating remediation systems. Projected future performance using the current remediation plan is assessed and reoptimization of operational variables for the current system or consideration of alternative designs are considered depending on the assessment results. We compare remediation duration and cost for the stepwise re-optimization approach with single stage optimization as well as with a non-optimized design based on typical engineering practice.

  11. 40 CFR 300.4 - Abbreviations.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... Function FCO—Federal Coordinating Officer FRERP—Federal Radiological Emergency Response Plan FRP—Federal Response Plan FS—Feasibility Study HRS—Hazard Ranking System LEPC—Local Emergency Planning Committee NCP... Action RCP—Regional Contingency Plan RD—Remedial Design RERT—Radiological Emergency Response Team RI...

  12. 40 CFR 300.4 - Abbreviations.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Function FCO—Federal Coordinating Officer FRERP—Federal Radiological Emergency Response Plan FRP—Federal Response Plan FS—Feasibility Study HRS—Hazard Ranking System LEPC—Local Emergency Planning Committee NCP... Action RCP—Regional Contingency Plan RD—Remedial Design RERT—Radiological Emergency Response Team RI...

  13. 40 CFR 300.4 - Abbreviations.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... Function FCO—Federal Coordinating Officer FRERP—Federal Radiological Emergency Response Plan FRP—Federal Response Plan FS—Feasibility Study HRS—Hazard Ranking System LEPC—Local Emergency Planning Committee NCP... Action RCP—Regional Contingency Plan RD—Remedial Design RERT—Radiological Emergency Response Team RI...

  14. 40 CFR 300.4 - Abbreviations.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Function FCO—Federal Coordinating Officer FRERP—Federal Radiological Emergency Response Plan FRP—Federal Response Plan FS—Feasibility Study HRS—Hazard Ranking System LEPC—Local Emergency Planning Committee NCP... Action RCP—Regional Contingency Plan RD—Remedial Design RERT—Radiological Emergency Response Team RI...

  15. Sample Federal Facility Land Use Control ROD Checklist and Suggested Language (LUC Checklist)

    EPA Pesticide Factsheets

    The LUC Checklist provides direction on describing and documenting land use controls (LUCs) in federal facility actrions under CERCLA in Records of Decision (RODs), remedial designs (RDs), and remedial action work plans (RAWPs).

  16. Remediation Plus System.

    ERIC Educational Resources Information Center

    Gross, Jo-Anne

    The Remediation Plus System for reading, spelling, and writing is based on phonemic awareness training, linguistic gymnastics, and Orton Gillingham methodology. It employs multisensory, systematic phonics and "exhaustively thorough" lesson plans. The system contains a training manual, a testing manual, three training videos, a…

  17. Remedial Action Plan for Deer Lake Area of Concern, 1987

    EPA Pesticide Factsheets

    Stage I document details Deer Lake’s history of mercury and other contamination, and describes sources of pollution and future remedial actions, to address beneficial use impairments identified by the Great Lakes Water Quality Board (WQB).

  18. Multi-Action Planning for Threat Management: A Novel Approach for the Spatial Prioritization of Conservation Actions

    PubMed Central

    Cattarino, Lorenzo; Hermoso, Virgilio; Carwardine, Josie; Kennard, Mark J.; Linke, Simon

    2015-01-01

    Planning for the remediation of multiple threats is crucial to ensure the long term persistence of biodiversity. Limited conservation budgets require prioritizing which management actions to implement and where. Systematic conservation planning traditionally assumes that all the threats in priority sites are abated (fixed prioritization approach). However, abating only the threats affecting the species of conservation concerns may be more cost-effective. This requires prioritizing individual actions independently within the same site (independent prioritization approach), which has received limited attention so far. We developed an action prioritization algorithm that prioritizes multiple alternative actions within the same site. We used simulated annealing to find the combination of actions that remediate threats to species at the minimum cost. Our algorithm also accounts for the importance of selecting actions in sites connected through the river network (i.e., connectivity). We applied our algorithm to prioritize actions to address threats to freshwater fish species in the Mitchell River catchment, northern Australia. We compared how the efficiency of the independent and fixed prioritization approach varied as the importance of connectivity increased. Our independent prioritization approach delivered more efficient solutions than the fixed prioritization approach, particularly when the importance of achieving connectivity was high. By spatially prioritizing the specific actions necessary to remediate the threats affecting the target species, our approach can aid cost-effective habitat restoration and land-use planning. It is also particularly suited to solving resource allocation problems, where consideration of spatial design is important, such as prioritizing conservation efforts for highly mobile species, species facing climate change-driven range shifts, or minimizing the risk of threats spreading across different realms. PMID:26020794

  19. Multi-action planning for threat management: a novel approach for the spatial prioritization of conservation actions.

    PubMed

    Cattarino, Lorenzo; Hermoso, Virgilio; Carwardine, Josie; Kennard, Mark J; Linke, Simon

    2015-01-01

    Planning for the remediation of multiple threats is crucial to ensure the long term persistence of biodiversity. Limited conservation budgets require prioritizing which management actions to implement and where. Systematic conservation planning traditionally assumes that all the threats in priority sites are abated (fixed prioritization approach). However, abating only the threats affecting the species of conservation concerns may be more cost-effective. This requires prioritizing individual actions independently within the same site (independent prioritization approach), which has received limited attention so far. We developed an action prioritization algorithm that prioritizes multiple alternative actions within the same site. We used simulated annealing to find the combination of actions that remediate threats to species at the minimum cost. Our algorithm also accounts for the importance of selecting actions in sites connected through the river network (i.e., connectivity). We applied our algorithm to prioritize actions to address threats to freshwater fish species in the Mitchell River catchment, northern Australia. We compared how the efficiency of the independent and fixed prioritization approach varied as the importance of connectivity increased. Our independent prioritization approach delivered more efficient solutions than the fixed prioritization approach, particularly when the importance of achieving connectivity was high. By spatially prioritizing the specific actions necessary to remediate the threats affecting the target species, our approach can aid cost-effective habitat restoration and land-use planning. It is also particularly suited to solving resource allocation problems, where consideration of spatial design is important, such as prioritizing conservation efforts for highly mobile species, species facing climate change-driven range shifts, or minimizing the risk of threats spreading across different realms.

  20. Remedial investigation work plan for Bear Creek Valley Operable Unit 1 (S-3 Ponds, Boneyard/Burnyard, Oil Landfarm, Sanitary Landfill 1, and the Burial Grounds, including Oil Retention Ponds 1 and 2) at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee. Volume 1, Main text

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1993-09-01

    The intent and scope of the work plan are to assemble all data necessary to facilitate selection of remediation alternatives for the sites in Bear Creek Valley Operable Unit 1 (BCV OU 1) such that the risk to human health and the environment is reduced to acceptable levels based on agreements with regulators. The ultimate goal is to develop a final Record Of Decision (ROD) for all of the OUs in BCV, including the integrator OU. However, the initial aim of the source OUs is to develop a ROD for interim measures. For source OUs such as BCV OU 1,more » data acquisition will not be carried out in a single event, but will be carried out in three stages that accommodate the schedule for developing a ROD for interim measures and the final site-wide ROD. The three stages are as follows: Stage 1, Assemble sufficient data to support decisions such as the need for removal actions, whether to continue with the remedial investigation (RI) process, or whether no further action is required. If the decision is made to continue the RI/FS process, then: Stage 2, Assemble sufficient data to allow for a ROD for interim measures that reduce risks to the human health and the environment. Stage 3, Provide input from the source OU that allows a final ROD to be issued for all OUs in the BCV hydrologic regime. One goal of the RI work plan will be to ensure that sampling operations required for the initial stage are not repeated at later stages. The overall goals of this RI are to define the nature and extent of contamination so that the impact of leachate, surface water runoff, and sediment from the OU I sites on the integrator OU can be evaluated, the risk to human health and the environment can be defined, and the general physical characteristics of the subsurface can be determined such that remedial alternatives can be screened.« less

  1. Jefferson Proving Ground, South of the Fining Line, Final Remedial Investigation/Feasibility Study, Resource Management Plan

    DTIC Science & Technology

    1993-01-01

    and various DOD sites. I From 1984 to 1987, Mr. Pincock was a Certified Radiation and Chemistry Technician for United Nuclear Industries. He performed...in 1983, Mr. Pincock assisted the senior technical staff in radiation protection as a Junior Health Physics Technician at the Nuclear Support Services...SCOPE OF PROGRAM This plan contains a description of the personnel and procedures for managing the Remedial Investigation/Feasibility Study (RI/FS) at

  2. Remedial Investigation Concept Plan for Picatinny Arsenal. Volume 2. Descriptions of and Sampling Plans for Remedial Investigation Sites

    DTIC Science & Technology

    1991-03-22

    by sulfur dioxide to convert hexavalent chromium into trivalent chromium , and by sodium hydroxide to promote precipitation. After being transferred...Regulations COD chemical oxygen demand Cr chromium CTF chlorine trifluoride Cu copper 2,4-D 2,4-dichlorophenoxyaoetic acid 11DCE 1,1...the Site. Inorganic results for surface soil showed elevated values for arsenic, cadmium, chromium , lead, and zinc (Table 2.1). These levels are to be

  3. 10 CFR 765.30 - Reimbursement of costs incurred in accordance with a plan for subsequent remedial action.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... COSTS OF REMEDIAL ACTION AT ACTIVE URANIUM AND THORIUM PROCESSING SITES Additional Reimbursement... reimbursement ratio established for such site; or (2) For the uranium site licensees only, $6.25, as adjusted...

  4. 10 CFR 765.30 - Reimbursement of costs incurred in accordance with a plan for subsequent remedial action.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... COSTS OF REMEDIAL ACTION AT ACTIVE URANIUM AND THORIUM PROCESSING SITES Additional Reimbursement... reimbursement ratio established for such site; or (2) For the uranium site licensees only, $6.25, as adjusted...

  5. 10 CFR 765.30 - Reimbursement of costs incurred in accordance with a plan for subsequent remedial action.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... COSTS OF REMEDIAL ACTION AT ACTIVE URANIUM AND THORIUM PROCESSING SITES Additional Reimbursement... reimbursement ratio established for such site; or (2) For the uranium site licensees only, $6.25, as adjusted...

  6. 10 CFR 765.30 - Reimbursement of costs incurred in accordance with a plan for subsequent remedial action.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... COSTS OF REMEDIAL ACTION AT ACTIVE URANIUM AND THORIUM PROCESSING SITES Additional Reimbursement... reimbursement ratio established for such site; or (2) For the uranium site licensees only, $6.25, as adjusted...

  7. SEDIMENTS: A RESERVOIR OF HISTORIC CONTAMINATION OF THE DETROIT RIVER

    EPA Science Inventory

    Presentation to a citizen's environment alliance regarding contamination of the Detroit River. Types and amounts of contaminants were outlined and major pollution sources were identified. Outline for remediation plan was presented. However, before remediation can be done, upstre...

  8. Use of fish telemetry in rehabilitation planning, management, and monitoring in Areas of Concern in the Laurentian Great Lakes

    USGS Publications Warehouse

    Brooks, J.L.; Boston, C.; Doka, Susan E.; Gorsky, Dimitry; Gustavson, K.; Hondorp, Darryl W.; Isermann, Daniel A.; Midwood, Jonathan D.; Pratt, T.C.; Rous, Andrew M.; Withers, J. L.; Krueger, C.C.; Cooke, S.J.

    2017-01-01

    Freshwater ecosystems provide many ecosystem services; however, they are often degraded as a result of human activity. To address ecosystem degradation in the Laurentian Great Lakes, Canada and the United States of America established the Great Lakes Water Quality Agreement (GLWQA). In 1987, 43 highly polluted and impacted areas were identified under the GLWQA as having one or more of 14 Beneficial Use Impairments (BUIs) to the physical and chemical habitat for fish, wildlife and humans, and were designated as Areas of Concern (AOC). Subnational jurisdictions combined with local stakeholders, with support from federal governments, developed plans to remediate and restore these sites. Biotelemetry (the tracking of animals using electronic tags) provides information on the spatial ecology of fish in the wild relevant to habitat management and stock assessment. Here, seven case studies are presented where biotelemetry data were directly incorporated within the AOC Remedial Action Plan (RAP) process. Specific applications include determining seasonal fish–habitat associations to inform habitat restoration plans, identifying the distribution of pollutant-indicator species to identify exposure risk to contamination sources, informing the development of fish passage facilities to enable fish to access fragmented upstream habitats, and assessing fish use of created or restored habitats. With growing capacity for fish biotelemetry research in the Great Lakes, we discuss the strengths and weaknesses of incorporating biotelemetry into AOC RAP processes to improve the science and practice of restoration and to facilitate the delisting of AOCs.

  9. Use of Fish Telemetry in Rehabilitation Planning, Management, and Monitoring in Areas of Concern in the Laurentian Great Lakes

    NASA Astrophysics Data System (ADS)

    Brooks, J. L.; Boston, C.; Doka, S.; Gorsky, D.; Gustavson, K.; Hondorp, D.; Isermann, D.; Midwood, J. D.; Pratt, T. C.; Rous, A. M.; Withers, J. L.; Krueger, C. C.; Cooke, S. J.

    2017-12-01

    Freshwater ecosystems provide many ecosystem services; however, they are often degraded as a result of human activity. To address ecosystem degradation in the Laurentian Great Lakes, Canada and the United States of America established the Great Lakes Water Quality Agreement (GLWQA). In 1987, 43 highly polluted and impacted areas were identified under the GLWQA as having one or more of 14 Beneficial Use Impairments (BUIs) to the physical and chemical habitat for fish, wildlife and humans, and were designated as Areas of Concern (AOC). Subnational jurisdictions combined with local stakeholders, with support from federal governments, developed plans to remediate and restore these sites. Biotelemetry (the tracking of animals using electronic tags) provides information on the spatial ecology of fish in the wild relevant to habitat management and stock assessment. Here, seven case studies are presented where biotelemetry data were directly incorporated within the AOC Remedial Action Plan (RAP) process. Specific applications include determining seasonal fish-habitat associations to inform habitat restoration plans, identifying the distribution of pollutant-indicator species to identify exposure risk to contamination sources, informing the development of fish passage facilities to enable fish to access fragmented upstream habitats, and assessing fish use of created or restored habitats. With growing capacity for fish biotelemetry research in the Great Lakes, we discuss the strengths and weaknesses of incorporating biotelemetry into AOC RAP processes to improve the science and practice of restoration and to facilitate the delisting of AOCs.

  10. Overview of Green and Sustainable Remediation for Soil and Groundwater Remediation - 12545

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Simpkin, Thomas J.; Favara, Paul

    2012-07-01

    Making remediation efforts more 'sustainable' or 'green' is a topic of great interest in the remediation community. It has been spurred on by Executive Orders from the White House, as well as Department of Energy (DOE) sustainability plans. In private industry, it is motivated by corporate sustainability goals and corporate social responsibility. It has spawned new organizations, areas of discussion, tools and practices, and guidance documents around sustainable remediation or green remediation. Green remediation can be thought of as a subset of sustainable remediation and is mostly focused on reducing the environmental footprint of cleanup efforts. Sustainable remediation includes bothmore » social and economic considerations, in addition to environmental. Application of both green and sustainable remediation (GSR) may involve two primary activities. The first is to develop technologies and alternatives that are greener or more sustainable. This can also include making existing remediation approaches greener or more sustainable. The second is to include GSR criteria in the evaluation of remediation alternatives and strategies. In other words, to include these GSR criteria in the evaluation of alternatives in a feasibility study. In some cases, regulatory frameworks allow the flexibility to include GSR criteria into the evaluation process (e.g., state cleanup programs). In other cases, regulations allow less flexibility to include the evaluation of GSR criteria (e.g., Comprehensive Environmental Response Compensation, and Liability Act (CERCLA)). New regulatory guidance and tools will be required to include these criteria in typical feasibility studies. GSR provides a number of challenges for remediation professionals performing soil and groundwater remediation projects. Probably the most significant is just trying to stay on top of the ever changing landscape of products, tools, and guidance documents coming out of various groups, the US EPA, and states. However, this process also provides new opportunities to think differently and look at the bigger picture of the overall benefit we are providing with our remediation projects. The opportunities from the move towards GSR are very real. They will help us make remedial actions truly more beneficial to the environment and to society. They will also allow (or force) remediation practitioners to think outside of the usual realm of approaches to find newer and more beneficial technologies. (authors)« less

  11. Green Chemistry and Engineering Opportunity Assessment (GC&EOA) to US Army. A Case Study in Sustainable Remediation

    DTIC Science & Technology

    2009-11-30

    transport of airborne contaminants and dust o Use heavy equipment efficiently (e.g. diesel emission reduction plan) o Maximize use of machinery equipped...remediation) Design for Energy Efficiency Favor low-energy technologies ( bioremediation , phytoremediation) where possible and effective; Use...Selection of a Remediation Scenario for a Diesel - Contaminated Site Using LCA. International Journal of Life Cycle Assessment 12(4), 239-251

  12. Tank waste remediation system privatization infrastructure program requirements and document management process guide

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    ROOT, R.W.

    1999-05-18

    This guide provides the Tank Waste Remediation System Privatization Infrastructure Program management with processes and requirements to appropriately control information and documents in accordance with the Tank Waste Remediation System Configuration Management Plan (Vann 1998b). This includes documents and information created by the program, as well as non-program generated materials submitted to the project. It provides appropriate approval/control, distribution and filing systems.

  13. Remedial Investigation Work Plan for Chestnut Ridge Operable Unit 1 (Chestnut Ridge Security Pits) at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1994-03-01

    This document outlines the activities necessary to conduct a Remedial Investigation (RI) of the Chestnut Ridge Security Pits (CRSP) at the Oak Ridge Y-12 Plant. The CRSP, also designated Chestnut Ridge Operable Unit (OU) 1, is one of four OUs along Chestnut Ridge on the Oak Ridge Reservation (ORR). The purpose of the RI is to collect data to (1) evaluate the nature and extent of known and suspected contaminants, (2) support an Ecological Risk Assessment (ERA) and a Human Health Risk Assessment (HHRA), (3) support the feasibility study in the development and analysis of remedial alternatives, and (4) ultimately,more » develop a Record of Decision (ROD) for the site. This chapter summarizes the regulatory background of environmental investigation on the ORR and the approach currently being followed and provides an overview of the RI to be conducted at the CRSP. Subsequent chapters provide details on site history, sampling activities, procedures and methods, quality assurance (QA), health and safety, and waste management related to the RI.« less

  14. 76 FR 30027 - National Oil and Hazardous Substance Pollution Contingency Plan; National Priorities List

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-24

    ... (dust, paint and water). These trigger criteria were used by the KF work group to identify and.... The KF work group developed and approved all action and no-action determinations. The property owners... remediation When one or more of the trigger criteria were exceeded, a work group evaluated a range of...

  15. Decoding ecosystem services in the neighborhood through ...

    EPA Pesticide Factsheets

    Remediation to Restoration to Revitalization (R2R2R) is a place-based practice that requires ongoing communication amongst agencies, local governments, and citizens. One of the challenges is that each of these entities have different relationships with and responsibilities to sites where R2R2R unfolds. Sediment remediation and habitat restoration project goals, community planning, and lived experiences diverge in scale, focus, and interaction depending on the agency or individual. In order to address this disconnect, we developed a framework to sort and classify data and identify ecosystem services collected through inductive methods like participant observation and document analysis. Data were collected between June 2015 and December 2016 and analyzed through content analysis as a first step. Participant observation was conducted in relation to the City of Duluth St. Louis River Corridor planning process at park planning public meetings, community group meetings, and City of Duluth technical advisory meetings. Document analysis was conducted on a variety of City of Duluth plans. The framework that emerged from the analysis includes neighborhood components that individuals, organizations, and local governments may discuss in the context of their community. The characteristics are a mix of built environment types, structural dimensions, personal experiences, and human-environment relationships and include: parks/open spaces, trails or connections, housing, schoo

  16. Tank waste remediation system configuration management implementation plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Vann, J.M.

    1998-03-31

    The Tank Waste Remediation System (TWRS) Configuration Management Implementation Plan describes the actions that will be taken by Project Hanford Management Contract Team to implement the TWRS Configuration Management program defined in HNF 1900, TWRS Configuration Management Plan. Over the next 25 years, the TWRS Project will transition from a safe storage mission to an aggressive retrieval, storage, and disposal mission in which substantial Engineering, Construction, and Operations activities must be performed. This mission, as defined, will require a consolidated configuration management approach to engineering, design, construction, as-building, and operating in accordance with the technical baselines that emerge from themore » life cycles. This Configuration Management Implementation Plan addresses the actions that will be taken to strengthen the TWRS Configuration Management program.« less

  17. A groundwater management plan for Stuttgart.

    PubMed

    Vasin, Sandra; Carle, Achim; Lang, Ulrich; Kirchholtes, Hermann Josef

    2016-09-01

    In general, groundwater in urban areas is exposed to anthropogenic influence and suffers from concentrations of contaminants. Stuttgart, as a highly industrialized city, has more than 5000 contaminated sites which might influence the Stuttgart's mineral water quality. Despite tremendous efforts and intensive single site orientated remediation since 1984 in downtown, the mineral springs were still affected with chlorinated hydrocarbons at low concentrations. Therefore, the applied practices of environmental management and measures for mitigation of pollution sources were not sufficient and had to be adjusted. The main goal of this study is to define an integral remediation plan (a groundwater management plan), focusing on the key sources of chlorinated solvents which are relevant for the mineral springs. For the large-scale investigated area of 26.6km(2) and eight aquifers, an extensive investigation and characterization methods were used in order to delineate the contamination plumes. By means of a 3D numerical model, the prioritization of the contaminated sites could be performed. Five contaminated sites with high remediation priority and need for optimized or additional remediation efforts were determined. For those five contaminated sites feasibility studies were performed which resulted in recommendation of remediation measures with total costs of more than 12.5 million euros. The proposed strategy and approach are suitable for multiple sources of contamination. Only in this way, the contributions of single contaminated sites to the total groundwater contamination can be identified and local remediation measures with their spatial impact simulated. Due to very complex geological conditions, technically there is no alternative to this strategy in order to achieve the contamination reduction in groundwater. Copyright © 2015 Elsevier B.V. All rights reserved.

  18. [Cognitive remediation therapy for children: literature data and clinical application in a child and adolescent psychiatry department].

    PubMed

    Doyen, C; Contejean, Y; Risler, V; Asch, M; Amado, I; Launay, C; Redon, P De Bois; Burnouf, I; Kaye, K

    2015-04-01

    The hypothesis of cerebral plasticity in psychiatric disorders has encouraged clinicians to develop cognitive remediation therapy (CRT), a new therapeutic approach based on attention, memory, planning, and mental flexibility tasks. The first cognitive remediation programs were developed and validated for adults with schizophrenia and were shown to have a positive impact on executive functions as well as on quality of life. In children and adolescents, researchers emphasized the existence of executive dysfunction in neurodevelopmental disorders such as autistic spectrum disorder, attention deficit disorder, and eating disorders. For these disorders, neuropsychological studies suggest that memory, planning, attention and mental flexibility are impaired. Despite the paucity of studies on cognitive remediation (CR) in children, preliminary results have suggested, as in adults with schizophrenia, good compliance and optimization of executive functioning. Consequently, programs dedicated to young subjects were developed in English-speaking countries, and the Department of Child and Adolescent Psychiatry of Sainte Anne Hospital (Paris) developed a new CR program for children with attention deficit disorder, academic problems, or eating disorders. These programs complete the field of CRT proposed by Sainte Anne Hospital's Remediation and Psychosocial Rehabilitation Reference Center, initially designed for adults with schizophrenia. Our team used and adapted validated tools such as Delahunty and Wykes's CRT program (translated and validated in French by Amado and Franck) and Lindvall and Lask's CRT Resource Pack. One program was developed for an adolescent with anorexia nervosa and applied to the subject and her family, but the purpose of this paper is to present a CR approach for children with attention deficit disorder or academic disorder, a 6-month program based on paper-pencil tasks and board and card games. The team was trained in different kinds of cognitive remediation, and the program was applied by a clinical nurse with the supervision of a child and adolescent psychiatrist and the department's neuropsychologists. Paper-pencil tasks were adapted from the CRT program for adults; the card and board games used were geometric figures, illusions, Rush Hour(®), Set(®), Jungle Speed(®), Color Addict(®), etc. These games are available in stores and the program can be applied at home, which helps families set aside their preoccupations with their child's academic performance. Diagnostic and neuropsychological evaluations were done before the beginning of the therapy and repeated at the end of the 6-month program. This program does not ignore the metapsychological impact of the therapy, and work on self-esteem is also done. The presence of the therapist is necessary, which seems better than a computer program, which cannot encourage the young subject in the same personalized and empathetic way. We therefore conducted the first clinical feasibility trial of cognitive remediation in young subjects and present a clinical case of a 6-year-old boy with attention deficit disorder and academic disorder. The results of neuropsychological evaluations before and after therapy suggest improvement in executive functions and better self-esteem. Satisfaction for the boy and his family was high. Even if these results need to be replicated, cognitive remediation appears to be a new therapeutic tool, complementary to classical approaches used in childhood psychiatric disorders. The Department of Child and Adolescent Psychiatry will submit this program to a research program conducted by the National Health Department to study the impact of this approach in a controlled study. Copyright © 2015 Elsevier Masson SAS. All rights reserved.

  19. Cost Effective, Ultra Sensitive Groundwater Monitoring for Site Remediation and Management: Standard Operating Procedures with QA/QC

    DTIC Science & Technology

    2015-05-01

    in consultation with the site management . 4.0 DATA TYPES AND QUALITY CONTROL A sampling plan must account for the collection, handling, and...GUIDANCE DOCUMENT Cost-Effective, Ultra-Sensitive Groundwater Monitoring for Site Remediation and Management : Standard Operating Procedures...Groundwater Monitoring for Site Remediation and Management 5b. GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER 6. AUTHOR(S) Halden, R.U., Roll, I.B. 5d

  20. INDEPENDENT REVIEW OF THE X-701B GROUNDWATER REMEDY, PORTSMOUTH, OHIO: TECHNICAL EVALUATION AND RECOMMENDATIONS

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Looney, B.; Eddy-Dilek, C.; Costanza, J.

    2008-12-15

    The Department of Energy Portsmouth Paducah Project Office requested assistance from Department of Energy Office of Environmental Management (EM-22) to provide independent technical experts to evaluate past and ongoing remedial activities at the Portsmouth facility that were completed to address TCE contamination associated with the X-701B groundwater plume and to make recommendations for future efforts. The Independent Technical Review team was provided with a detailed and specific charter. The charter requested that the technical team first review the past and current activities completed for the X-701B groundwater remedy for trichloroethene (TCE) in accordance with a Decision Document that was issuedmore » by Ohio EPA on December 8, 2003 and a Work Plan that was approved by Ohio EPA on September 22, 2006. The remedy for X-701B divides the activities into four phases: Phase I - Initial Source Area Treatment, Phase II - Expanded Source Area Treatment, Phase III - Evaluation and Reporting, and Phase IV - Downgradient Remediation and Confirmation of Source Area Treatment. Phase I of the remedy was completed during FY2006, and DOE has now completed six oxidant injection events within Phase II. The Independent Technical Review team was asked to evaluate Phase II activities, including soil and groundwater results, and to determine whether or not the criteria that were defined in the Work Plan for the Phase II end point had been met. The following criteria are defined in the Work Plan as an acceptable Phase II end point: (1) Groundwater samples from the identified source area monitoring wells have concentrations below the Preliminary Remediation Goal (PRG) for TCE in groundwater, or (2) The remedy is no longer effective in removing TCE mass from the source area. In addition, the charter specifies that if the Review Team determines that the Phase II endpoint has not been reached, then the team should address the following issues: (1) If additional injection events are recommended, the team should identify the type of injection and target soil horizon for these injections; (2) Consider the feasibility of declaring Technical Impracticability and proceeding with the RCRA Cap for the X-701B; and (3) Provide a summary of other cost-effective technologies that could be implemented (especially for the lower Gallia). The Independent Technical Review team focused its evaluation solely on the X-701B source zone and contaminant plume. It did not review current or planned remedial activities at other plumes, waste areas, or landfills at the Portsmouth site, nor did it attempt to integrate such activities into its recommendations for X-701B. However, the ultimate selection of a remedy for X-701B by site personnel and regulators should take into account potentially synergistic efforts at other waste areas. Assessment of remedial alternatives in the context of site-wide management practices may reveal opportunities for leveraging and savings that would not otherwise be identified. For example, the cost of source-zone excavation or construction of a permeable reactive barrier at X-701B might be substantially reduced if contaminated soil could be buried on site at an existing or planned landfill. This allowance would improve the feasibility and competitiveness of both remedies. A comprehensive examination of ongoing and future environmental activities across the Portsmouth Gaseous Diffusion Plant is necessary to optimize the selection and timing of X-701B remediation with respect to cleanup efficiency, safety, and economics. A selected group of technical experts attended the technical workshop at the Portsmouth Gaseous Diffusion Plant from November 18 through 21, 2008. During the first day of the workshop, both contractor and DOE site personnel briefed the workshop participants and took them on a tour of the X-701B site. The initial briefing was attended by representatives of Ohio EPA who participated in the discussions. On subsequent days, the team reviewed baseline data and reports, were provided additional technical information from site personnel, evaluated work plans, determined critical issues and uncertainties, and recommended alternatives. This report documents the findings and recommendations of the independent technical review team.« less

  1. Predictors of response to cognitive remediation in service recipients with severe mental illness.

    PubMed

    Lindenmayer, Jean-Pierre; Ozog, Veronica Anna; Khan, Anzalee; Ljuri, Isidora; Fregenti, Samantha; McGurk, Susan R

    2017-03-01

    Cognitive challenges are prominent features of individuals diagnosed with schizophrenia, impairing occupational, social, and economic functioning. These challenges are predictive of social and work outcomes. Cognitive remediation has been shown to be effective in improving both cognitive and social functions. However, cognitive remediation does not produce improvement in all participants. We investigated demographic, neurocognitive, and psychopathological predictors associated with improvement following cognitive remediation interventions in service recipients with severe mental illnesses. One hundred thirty-seven adult participants with a diagnosis of schizophrenia, schizoaffective disorder, or bipolar disorder according to the Diagnostic and Statistical Manual of Mental Disorders (4th ed., text rev.) were enrolled in 12-week cognitive remediation programs. Assessments of demographic and illness variables, together with baseline and end point assessment of psychopathology (Positive and Negative Syndrome Scale [PANSS]), neurocognition (Measurement and Treatment Research to Improve Cognition in Schizophrenia [MATRICS] Consensus Cognitive Battery [MCBB]), and social functions (Personal and Social Performance Scale [PSP]) were conducted. Change in cognitive domains was calculated using the reliable change index. Logistic regression analysis was used to assess predictors of cognitive improvement after the intervention. Sixty-two percent of participants improved on at least 1 of the MCCB domains. Higher baseline speed of processing, attention or vigilance, and working memory predicted a positive response to cognitive remediation. Younger age, higher education level, shorter length of stay, and lower PANSS Negative and Disorganized factors were additional predictors. Our results indicate the clinical usefulness of cognitive remediation and identified a pattern of clinical and cognitive predictors of good response to the intervention. Identification of these predictive factors by clinicians may enhance the outcome and aid in the development of individualized rehabilitative cognitive remediation treatment plans. (PsycINFO Database Record (c) 2017 APA, all rights reserved).

  2. Evaluation of home lead remediation in an Australian mining community.

    PubMed

    Boreland, F; Lesjak, M; Lyle, D

    2009-12-20

    In 1994 a comprehensive program was established to reduce children's blood lead levels in Broken Hill, NSW, Australia. Home remediation (abatement of lead hazards in a child's home) was included as part of a case management strategy for children with blood lead levels >or=15 microg/dL. Children with blood lead levels >or=30 microg/dL were offered immediate home remediation. Children with blood lead levels of 15-29 microg/dL were allocated to 'immediate' or 'delayed' home remediation; a subset of these participated in a randomized controlled trial (RCT) to evaluate the effectiveness of home remediation for reducing blood lead levels. One hundred and seventeen children received home remediation. One hundred and thirteen returned for follow-up blood tests, 88 of whom participated in the RCT. On average children's blood lead levels decreased by 1.7 microg/dL (10%) in the 6 months after remediation and by 2.2 microg/dL (13%) in the 6-12 months after remediation. However, remediation did not significantly change the rate of decline in blood lead levels (P=0.609). There was no evidence of association between change in children's blood lead levels and changes in lead loading in their homes. The results are consistent with the published literature, which suggests that home remediation does not reduce children's exposure to lead sufficiently to cause a moderate or greater decrease in their blood lead level. In communities where lead is widely dispersed, the study suggests that it is important to assess potential sources and pathways by which children are exposed to lead when developing an intervention plan, and the need for multiple interventions to effectively reduce blood lead levels. The findings reinforce the ongoing need for rigorous epidemiological evaluation of lead management programs to improve the evidence base, and for effective primary prevention to avoid children being exposed to lead in the first place.

  3. Summary Report of Comprehensive Laboratory Testing to Establish the Effectiveness of Proposed Treatment Methods for Unremediated and Remediated Nitrate Salt Waste Streams

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Anast, Kurt Roy; Funk, David John; Hargis, Kenneth Marshall

    The inadvertent creation of transuranic waste carrying hazardous waste codes D001 and D002 requires the treatment of the material to eliminate the hazardous characteristics and allow its eventual shipment and disposal at the Waste Isolation Pilot Plant (WIPP). This report documents the effectiveness of two treatment methods proposed to stabilize both the unremediated and remediated nitrate salt waste streams (UNS and RNS, respectively) at Los Alamos National Laboratory (LANL). The two technologies include the addition of zeolite (with and without the addition of water as a processing aid) and cementation. Surrogates were developed to evaluate both the solid and liquidmore » fractions expected from parent waste containers, and both the solid and liquid fractions were tested. Both technologies are shown to be effective at eliminating the characteristic of ignitability (D001), and the addition of zeolite was determined to be effective at eliminating corrosivity (D002), with the preferred option1 of adding zeolite currently planned for implementation at LANL’s Waste Characterization, Reduction, and Repackaging Facility (WCRRF). The course of this work verified the need to evaluate and demonstrate the effectiveness of the proposed remedy for debris material, if required. The evaluation determined that WypAlls, cheesecloth, and Celotex absorbed with saturated nitrate salt solutions exhibit the ignitability characteristic (all other expected debris is not classified as ignitable). Finally, liquid surrogates containing saturated nitrate salts did not exhibit the characteristic of ignitability in their pure form (those neutralized with Kolorsafe and mixed with sWheat did exhibit D001). Sensitivity testing and an analysis were conducted to evaluate the waste form for reactivity. Tests included subjecting surrogate material to mechanical impact, friction, electrostatic discharge and thermal insults. The testing confirmed that the waste does not exhibit the characteristic of reactivity (D003). Follow-on testing was conducted to demonstrate the effectiveness of zeolite stabilization for ignitable WypAll and cheesecloth debris and additional nitrate salt solutions (those exhibiting the oxidizer characteristic) to demonstrate the effectiveness of the remedy. Follow-on testing also included testing of surrogate materials containing Waste Lock 770, which is present in four of the RNS containers, and potential items of debris such as plywood and Celotex material. Testing to evaluate the effectiveness of the remedy was performed using the specific remediation processes that are planned for use at the WCRRF. Finally, testing was also performed to evaluate the holding capacity of zeolite using a highly acidic surrogate solution and to characterize the composition of gases generated during mixing of zeolite with surrogate solutions. All these tests demonstrated the effectiveness of adding zeolite as the planned remedy.« less

  4. 40 CFR 300.120 - On-scene coordinators and remedial project managers: general responsibilities.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 28 2014-07-01 2014-07-01 false On-scene coordinators and remedial project managers: general responsibilities. 300.120 Section 300.120 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SUPERFUND, EMERGENCY PLANNING, AND COMMUNITY RIGHT-TO-KNOW PROGRAMS...

  5. 40 CFR 300.120 - On-scene coordinators and remedial project managers: general responsibilities.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 27 2010-07-01 2010-07-01 false On-scene coordinators and remedial project managers: general responsibilities. 300.120 Section 300.120 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SUPERFUND, EMERGENCY PLANNING, AND COMMUNITY RIGHT-TO-KNOW PROGRAMS...

  6. 40 CFR 300.120 - On-scene coordinators and remedial project managers: general responsibilities.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 29 2013-07-01 2013-07-01 false On-scene coordinators and remedial project managers: general responsibilities. 300.120 Section 300.120 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SUPERFUND, EMERGENCY PLANNING, AND COMMUNITY RIGHT-TO-KNOW PROGRAMS...

  7. 40 CFR 300.120 - On-scene coordinators and remedial project managers: general responsibilities.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 28 2011-07-01 2011-07-01 false On-scene coordinators and remedial project managers: general responsibilities. 300.120 Section 300.120 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SUPERFUND, EMERGENCY PLANNING, AND COMMUNITY RIGHT-TO-KNOW PROGRAMS...

  8. 40 CFR 300.120 - On-scene coordinators and remedial project managers: general responsibilities.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 29 2012-07-01 2012-07-01 false On-scene coordinators and remedial project managers: general responsibilities. 300.120 Section 300.120 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SUPERFUND, EMERGENCY PLANNING, AND COMMUNITY RIGHT-TO-KNOW PROGRAMS...

  9. High School PREP: Thematic Planning, Fall '83. Preparation for Raising Educational Performance. [HS PREP Experimental Program].

    ERIC Educational Resources Information Center

    New York City Board of Education, Brooklyn, NY. Div. of Curriculum and Instruction.

    This is a handbook designed for carrying out the goals and objectives of Preparation for Raising Educational Performance (PREP), a thematic, remedial program for ninth graders in New York City public schools. The lessons presented in the handbook model an approach to learning which follows the patterns of actual language development: listening,…

  10. Remedial investigation/feasibility study for the David Witherspoon, Inc., 901 Site, Knoxville, Tennessee: Volume 2, Appendixes

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1996-10-01

    This document contains the appendixes for the remedial investigation and feasibility study for the David Witherspoon, Inc., 901 site in Knoxville, Tennessee. The following topics are covered in the appendixes: (A) David Witherspoon, Inc., 901 Site Historical Data, (B) Fieldwork Plans for the David Witherspoon, Inc., 901 Site, (C) Risk Assessment, (D) Remediation Technology Discussion, (E) Engineering Support Documentation, (F) Applicable or Relevant and Appropriate Requirements, and (G) Cost Estimate Documentation.

  11. Ohio Water Resources Council

    Science.gov Websites

    Salt Storage Fact Sheet QUICK LINKS 2015-2019 Strategic Action Plan 2010-2014 Strategic Action Plan 2006 Strategic Action Plan OWRC Bylaws For More Information Brian Hall OWRC - State Agency Coordinating Program (Indirect Discharge) Primary Headwater Habitat Streams Remedial Action Plans (RAP) River Mile Maps

  12. DOD Financial Management: Significant Efforts Still Needed for Remediating Audit Readiness Deficiencies

    DTIC Science & Technology

    2017-02-01

    19As defined in generally accepted government auditing standards, information technology controls...Financial Improvement and Audit Readiness (FIAR) Plan Status Report, while DOD continues to make progress in addressing information technology ...DOD FINANCIAL MANAGEMENT Significant Efforts Still Needed for Remediating Audit Readiness Deficiencies Report to

  13. 42 CFR 51.10 - Remedial actions.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 42 Public Health 1 2011-10-01 2011-10-01 false Remedial actions. 51.10 Section 51.10 Public Health... actions. Failure to submit an annual report in the designated format on time or to submit requested information and documentation, corrective action plans and ongoing implementation status reports in response...

  14. Remediation of an oily leachate pond in Estonia.

    PubMed

    Kriipsalu, Mait; Marques, Marcia; Hogland, William

    2005-12-01

    Until recent years, waste oil and oil-contaminated waters commonly ended up in landfills. At some dump sites, ponds of oily liquids and leachate were formed. To remediate such ponds, an interdisciplinary approach is now required, keeping costs at an affordable level, particularly in countries with changing economies. From 1974 to 1993, liquid oily wastes taken to the Laguja landfill, in Estonia, were disposed of in a pond with a surface area of 9800 m2. It was estimated that the pond contained 4500-6000 m3 of oily water and 3500 m3 of oil-containing bottom sediments. This study aimed at developing an environmentally sound and cost-effective method for remediation of the oily liquids, leachate and contaminated underlying sediment material, to meet the existing legal demands. It was concluded that treatment of contaminated water is well established and the procedures carried out to meet the regulatory demands achieved satisfactory results. However, regarding treatment of sediments it was concluded that legal and technological aspects, as well as monitoring procedures are not fully established and are usually underestimated. Laboratory investigations can provide valuable information in decision-making, and contribute to effective full-scale remediation planning.

  15. Developmental/remedial sciences at community colleges in five states in the central part of the United States

    NASA Astrophysics Data System (ADS)

    Paramore, Tricia L.

    Phipps (1998) emphasized interinstitutional collaboration among colleges to share and replicate best practices and ideas as a strategy to improve the effectiveness of developmental/remedial education, but Johnson (2001) noted a lack of communication between science educators and developmental educators. The purposes of this mixed methods study were (a) to identify and examine the characteristics of developmental/remedial sciences as it existed in the 2006-2007 academic year in terms of organization, structure, instructional practices, and curriculum as offered at community colleges in five states in the central part of the United States; and (b) to develop a set of guidelines for community college faculty and administrators to use in making decisions about whether or not to offer developmental/remedial sciences and identify the general steps to follow in implementation. The study was conducted in four phases which involved two surveys, subsequent interviews with leaders at three institutions selected for case study, and guideline development. Developmental/remedial sciences were offered at few institutions. At those institutions where they were offered, however, nearly half offered courses and multiple support services, but did not define their offerings as a program. Some developmental education best practices were adopted (such as integrating study skills with science content in courses and using a variety of instructional strategies), but many, including goals and assessment, were omitted. Interviewees indicated the need for developmental/remedial sciences would continue in the future. Guidelines to use in determining whether to offer developmental/remedial sciences included the following: (1) adopt an attitude of quality improvement; (2) look to faculty as a #1 resource; (3) assess what is currently offered in the sciences and ask if it works; (4) know what you are remediating; (5) start a conversation between the academic department and support services staff to create a truly integrated program; (6) consider placement and advising; (7) consider assessment; (8) consider training and experience of faculty; (9) plan for the appropriate physical space and staff; and (10)do your homework.

  16. Test Plan for the Phytoremediation Studies of Lead-Contaminated Soil from the Sunflower Army Ammunition Plant, Desoto, Kansas. Volume I.

    DTIC Science & Technology

    1996-10-01

    Document provides a Test Plan for studying and improving techniques tor remediating lead contaminated soils using Phytoremediation . Test Plan for study examining the uptake of lead by Plants in contaminated soils.

  17. Test Plan for the Phytoremediation Studies of Lead-Contaminated Soil from the Sunflower Army Ammunition Plant, Desoto, Kansas. Volume II.

    DTIC Science & Technology

    1996-10-01

    Document provides a Test Plan for studying and improving techniques tor remediating lead contaminated soils using Phytoremediation . Test Plan for study examining the uptake of lead by Plants in contaminated soils.

  18. Program Risk Planning with Risk as a Resource

    NASA Technical Reports Server (NTRS)

    Ray, Paul S.

    1998-01-01

    The current focus of NASA on cost effective ways of achieving mission objectives has created a demand for a change in the risk management process of a program. At present, there is no guidelines as to when risk taking is justified due to high cost for a marginal improvement in risk. As a remedial step, Dr. Greenfield of NASA, developed a concept of risk management with risk as a resource. In the report, the following topics are addressed: (1) the risk management approach; (2) planning risk and program life cycle; (3) key components of a typical program; (4) the risk trading methodology; (5) review and decision process; (6) merits of the proposed risk planning approach; and (7) recommendations.

  19. Decommissioning of the Iraq former nuclear complex

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Abbas, Mohammed; Helou, Tuama; Ahmead, Bushra

    2007-07-01

    Available in abstract form only. Full text of publication follows: A number of sites in Iraq have some degree of radiological contamination and require decommissioning and remediation in order to ensure radiological safety. Many of these sites in Iraq are located at the nuclear research centre at Al Tuwaitha. The International Atomic Energy Agency (IAEA) Board of Governors has approved a project to assist the Government of Iraq in the evaluation and decommissioning of former facilities that used radioactive materials. The project is divided into three phases: Phase 1: collect and analyze all available data and conduct training of themore » Iraqi staff, Phase 2: develop a decommissioning and remediation plan, and Phase 3: implement field activities relating to decommissioning, remediation and site selection suitable for final disposal of waste. Four working groups have been established to complete the Phase 1 work and significant progress has been made in drafting a new nuclear law which will provide the legal basis for the licensing of the decommissioning of the former nuclear complex. Work is also underway to collect and analysis existing date, to prioritize future activities and to develop a waste management strategy. This will be a long-term and costly project. (authors)« less

  20. FY 95 engineering work plan for the design reconstitution implementation action plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bigbee, J.D.

    Design reconstitution work is to be performed as part of an overall effort to upgrade Configuration Management (CM) at TWRS. WHC policy is to implement a program that is compliant with DOE-STD-1073-93, Guide for Operational Configuration Management Program. DOE-STD-1073 requires an adjunct program for reconstituting design information. WHC-SD-WM-CM-009, Design Reconstitution Program Plan for Waste Tank Farms and 242-A Evaporator of Tank Waste Remediation System, is the TWRS plan for meeting DOE-STD-1073 design reconstitution requirements. The design reconstitution plan is complex requiring significant time and effort for implementation. In order to control costs, and integrate the work into other TWRS activities,more » a Design Reconstitution Implementation Action Plan (DR IAP) will be developed, and approved by those organizations having ownership or functional interest in this activity.« less

  1. Stage II Remedial Action Plan Deer Lake AOC

    EPA Pesticide Factsheets

    Michigan Department of Environmental Quality reports on actions taken that have resulted in the removal of two beneficial use impairments. Outlines plans to remove remaining BUI and to delist the Area Of Concern.

  2. Superfund Program Review

    EPA Pesticide Factsheets

    This document presents outcomes of implementing a number of the actions described in the November 2013 Superfund Remedial Program Review (SPR) Action Plan . It also describes ongoing Action Plan efforts and projects future outcomes anticipated in FY 2015

  3. 75 FR 346 - Environmental Management Site-Specific Advisory Board, Idaho National Laboratory

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-05

    ... current agenda): Progress to Cleanup. InSitu Grouting--Draft Remedial Design and Remedial Action Work Plan... this meeting be announced in the Federal Register. DATES: Wednesday, January 20, 2010, 8 a.m.-5 p.m... in the areas of environmental restoration, waste management, and related activities. Tentative Topics...

  4. Notification: Audit of EPA's Processes for Managing Background Investigations of Privileged Users and Taking Action to Remediate Weaknesses in Agency's Information Security Program

    EPA Pesticide Factsheets

    Project #OA-FY17-0139, Feb 15, 2017.The EPA OIG plans to begin preliminary research on an audit of EPA's processes for managing background investigations of privileged users and taking action to remediate weaknesses in agency's info security program.

  5. Assessing the external benefits of contaminated soil remediation in Korea: a choice experiment study.

    PubMed

    Lim, Seul-Ye; Kim, Hyo-Jin; Yoo, Seung-Hoon

    2018-06-01

    Korean government has made and will continue to make a considerable investment in contaminated soil remediation to rectify the problems that arise from soil pollution. Quantitative information on the benefits of contaminated soil remediation is widely demanded by the public as well as the government. This article aims to assess the external benefits of contaminated soil remediation. A survey of 1000 randomly selected households was undertaken in Korea. The results show that the marginal willingness to pay values for a 1% decrease in human health hazard, a 1% improvement in biodiversity restoration, and 1000 new job creation by contaminated soil remediation are estimated to be KRW 204 (USD 0.17), 593 (0.50), and 238 (0.20) per household per year. The findings can provide policy-makers with useful information for both evaluating and planning the contaminated soil remediation.

  6. Remediation in Canadian medical residency programs: Established and emerging best practices.

    PubMed

    Shearer, Cindy; Bosma, Mark; Bergin, Fiona; Sargeant, Joan; Warren, Andrew

    2018-02-23

    Policies to guide remediation in postgraduate medical education exist in all Canadian medical schools. This study examines concordance between these policies and processes, and published "best practices" in remediation. We conducted a literature review to identify best practices in the area of remediation. We then reviewed remediation policies from all 13 English medical schools in Canada other than our own and conducted interviews with key informants from each institution. Each policy and interview transcript pair was then reviewed for evidence of pre-defined "best practices." Team members also noted additional potential policy or process enablers of successful remediation. Most policies and processes aligned with some but not all published best practices. For instance, all participating schools tailored remediation strategies to individual resident needs, and a majority encouraged faculty-student relationships during remediation. Conversely, few required the teaching of goal-setting, strategic planning, self-monitoring, and self-awareness. In addition, we identified avoidance of automatic training extension and the use of an educational review board to support the remediation process as enablers for success. Remediation policies and practices in Canada align well with published best practices in this area. Based on key informant opinions, flexibility to avoid training extension and use of an educational review board may also support optimal remediation outcomes.

  7. Remedial investigation concept plan for the groundwater operable units at the chemical plant area and the ordnance works area, Weldon Spring, Missouri

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1999-07-15

    The U.S. Department of Energy (DOE) and the U.S. Department of the Army (DA) are conducting cleanup activities at two properties--the DOE chemical plant area and the DA ordnance works area (the latter includes the training area)--located in the Weldon Spring area in St. Charles County, Missouri. These areas are on the National Priorities List (NPL), and cleanup activities at both areas are conducted in accordance with the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), as amended. DOE and DA are conducting a joint remedial investigation (RI) and baseline risk assessment (BRA) as part of the remedial investigation/feasibility studymore » (RI/FS) for the groundwater operable units for the two areas. This joint effort will optimize further data collection and interpretation efforts and facilitate overall remedial decision making since the aquifer of concern is common to both areas. A Work Plan issued jointly in 1995 by DOE and the DA discusses the results of investigations completed at the time of preparation of the report. The investigations were necessary to provide an understanding of the groundwater system beneath the chemical plant area and the ordnance works area. The Work Plan also identifies additional data requirements for verification of the evaluation presented.« less

  8. Opportunities and challenges of integrating ecological restoration into assessment and management of contaminated ecosystems.

    PubMed

    Hull, Ruth N; Luoma, Samuel N; Bayne, Bruce A; Iliff, John; Larkin, Daniel J; Paschke, Mark W; Victor, Sasha L; Ward, Sara E

    2016-04-01

    Ecosystem restoration planning near the beginning of the site assessment and management process ("early integration") involves consideration of restoration goals from the outset in developing solutions for contaminated ecosystems. There are limitations to integration that stem from institutional barriers, few successful precedents, and limited availability of guidance. Challenges occur in integrating expertise from various disciplines and multiple, sometimes divergent interests and goals. The more complex process can result in timing, capacity, communication, and collaboration challenges. On the other hand, integrating the 2 approaches presents new and creative opportunities. For example, integration allows early planning for expanding ecosystem services on or near contaminated lands or waters that might otherwise have been unaddressed by remediation alone. Integrated plans can explicitly pursue ecosystem services that have market value, which can add to funds for long-term monitoring and management. Early integration presents opportunities for improved and productive collaboration and coordination between ecosystem restoration and contaminant assessment and management. Examples exist where early integration facilitates liability resolution and generates positive public relations. Restoration planning and implementation before the completion of the contaminated site assessment, remediation, or management process ("early restoration") can facilitate coordination with offsite restoration options and a regional approach to restoration of contaminated environments. Integration of performance monitoring, for both remedial and restoration actions, can save resources and expand the interpretive power of results. Early integration may aid experimentation, which may be more feasible on contaminated lands than in many other situations. The potential application of concepts and tools from adaptive management is discussed as a way of avoiding pitfalls and achieving benefits in early integration. In any case, there will be challenges with early integration of restoration concepts for contaminated ecosystems, but the benefits are likely to outweigh them. © 2015 The Authors. Integrated Environmental Assessment and Management published by Wiley Periodicals, Inc. on behalf of Society of Environmental Toxicology & Chemistry (SETAC).

  9. 24 CFR 401.403 - Rejection of a request for a Restructuring Plan because of actions or omissions of owner or...

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... likely to be remedied in a cost-effective manner through the Restructuring Plan. (3) Exception for sale... Restructuring Plan because of actions or omissions of owner or affiliate or project condition. 401.403 Section...-MARKET) Restructuring Plan § 401.403 Rejection of a request for a Restructuring Plan because of actions...

  10. Remedial training for the radiology resident: a template for optimization of the learning plan.

    PubMed

    Mar, Colin; Chang, Silvia; Forster, Bruce

    2015-02-01

    All radiology residency programs should strive for the early identification of individuals in need of remedial training and have an approach ready to address this situation. This article provides a template for a step-by-step approach which is team based. It includes definition of the learning or performance issues, creation of suitable learning objectives and learning plan, facilitation of feedback and assessment, and definition of outcomes. Using such a template will assist the resident in returning to the path toward a safe and competent radiologist. Copyright © 2015 AUR. Published by Elsevier Inc. All rights reserved.

  11. Superfund Record of Decision (EPA Region 4): Milan Army Ammunition Plant, Milan, TN, March 11, 1998

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1998-09-01

    This decision document presents the selected action for the Salvage Yard, Former Ammunition Burnout Area (ABA), and Sanitary Landfill at MLAAP, located in Gibson and Carroll Counties, TN. This ROD addresses the final response action planned for the Salvage Yard, Former ABA, and Sanitary Landfill, including soil and groundwater. NFA is the selected remedy for soil and groundwater at the Salvage Yard, Former ABA, and Sanitary landfill. The selected remedy manages the risk to acceptable levels for both human health and the environment and is the final action planned.

  12. System-Scale Model of Aquifer, Vadose Zone, and River Interactions for the Hanford 300 Area - Application to Uranium Reactive Transport

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Rockhold, Mark L.; Bacon, Diana H.; Freedman, Vicky L.

    2013-10-01

    This report represents a synthesis and integration of basic and applied research into a system-scale model of the Hanford 300 Area groundwater uranium plume, supported by the U.S. Department of Energy’s Richland Operations (DOE-RL) office. The report integrates research findings and data from DOE Office of Science (DOE-SC), Office of Environmental Management (DOE-EM), and DOE-RL projects, and from the site remediation and closure contractor, Washington Closure Hanford, LLC (WCH). The three-dimensional, system-scale model addresses water flow and reactive transport of uranium for the coupled vadose zone, unconfined aquifer, and Columbia River shoreline of the Hanford 300 Area. The system-scale modelmore » of the 300 Area was developed to be a decision-support tool to evaluate processes of the total system affecting the groundwater uranium plume. The model can also be used to address “what if” questions regarding different remediation endpoints, and to assist in design and evaluation of field remediation efforts. For example, the proposed cleanup plan for the Hanford 300 Area includes removal, treatment, and disposal of contaminated sediments from known waste sites, enhanced attenuation of uranium hot spots in the vadose and periodically rewetted zone, and continued monitoring of groundwater with institutional controls. Illustrative simulations of polyphosphate infiltration were performed to demonstrate the ability of the system-scale model to address these types of questions. The use of this model in conjunction with continued field monitoring is expected to provide a rigorous basis for developing operational strategies for field remediation and for defining defensible remediation endpoints.« less

  13. 76 FR 58404 - National Oil and Hazardous Substances Pollution Contingency Plan; National Priorities List...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-21

    ... and Hazardous Substances Pollution Contingency Plan; National Priorities List: Partial Deletion of the..., as amended, is an appendix of the National Oil and Hazardous Substances Pollution Contingency Plan... opportunities for investigation and soil remediation, if the Program's Work Group determines that lead in...

  14. The effects of acidic mine drainage from historical mines in the Animas River watershed, San Juan County, Colorado—What is being done and what can be done to improve water quality?

    USGS Publications Warehouse

    Church, Stanley E; Owen, J. Robert; Von Guerard, Paul; Verplanck, Philip L.; Kimball, Briant A.; Yager, Douglas B.

    2006-01-01

    Historical production of metals in the western United States has left a legacy of acidic drainage and toxic metals in many mountain watersheds that are a potential threat to human and ecosystem health. Studies of the effects of historical mining on surface water chemistry and riparian habitat in the Animas River watershed have shown that cost-effective remediation of mine sites must be carefully planned. Of the more than 5400 mine, mill, and prospect sites in the watershed, 80 sites account for more than 90% of the metal loads to the surface drainages. Much of the low pH water and some of the metal loads are the result of weathering of hydrothermally altered rock that has not been disturbed by historical mining. Some stream reaches in areas underlain by hydrothermally altered rock contained no aquatic life prior to mining. Scientific studies of the processes and metal-release pathways are necessary to develop effective remediation strategies, particularly in watersheds where there is little land available to build mine-waste repositories. Characterization of mine waste, development of runoff profiles, and evaluation of ground-water pathways all require rigorous study and are expensive upfront costs that land managers find difficult to justify. Tracer studies of water quality provide a detailed spatial analysis of processes affecting surface- and ground-water chemistry. Reactive transport models were used in conjunction with the best state-of-the-art engineering solutions to make informed and cost-effective remediation decisions. Remediation of 23% of the high-priority sites identified in the watershed has resulted in steady improvement in water quality. More than $12 million, most contributed by private entities, has been spent on remediation in the Animas River watershed. The recovery curve for aquatic life in the Animas River system will require further documentation and long-term monitoring to evaluate the effectiveness of remediation projects implemented.

  15. The effects of acidic mine drainage from historical mines in the Animas River watershed, San Juan County, Colorado—What is being done and what can be done to improve water quality?

    USGS Publications Warehouse

    Church, Stanley E.; Owen, Robert J.; Von Guerard, Paul; Verplanck, Philip L.; Kimball, Briant A.; Yager, Douglas B.

    2007-01-01

    Historical production of metals in the western United States has left a legacy of acidic drainage and toxic metals in many mountain watersheds that are a potential threat to human and ecosystem health. Studies of the effects of historical mining on surface water chemistry and riparian habitat in the Animas River watershed have shown that cost-effective remediation of mine sites must be carefully planned. of the more than 5400 mine, mill, and prospect sites in the watershed, ∼80 sites account for more than 90% of the metal loads to the surface drainages. Much of the low pH water and some of the metal loads are the result of weathering of hydrothermally altered rock that has not been disturbed by historical mining. Some stream reaches in areas underlain by hydrothermally altered rock contained no aquatic life prior to mining.Scientific studies of the processes and metal-release pathways are necessary to develop effective remediation strategies, particularly in watersheds where there is little land available to build mine-waste repositories. Characterization of mine waste, development of runoff profiles, and evaluation of ground-water pathways all require rigorous study and are expensive upfront costs that land managers find difficult to justify. Tracer studies of water quality provide a detailed spatial analysis of processes affecting surface- and ground-water chemistry. Reactive transport models were used in conjunction with the best state-of-the-art engineering solutions to make informed and cost-effective remediation decisions.Remediation of 23% of the high-priority sites identified in the watershed has resulted in steady improvement in water quality. More than $12 million, most contributed by private entities, has been spent on remediation in the Animas River watershed. The recovery curve for aquatic life in the Animas River system will require further documentation and long-term monitoring to evaluate the effectiveness of remediation projects implemented.

  16. Remedial Investigation/Feasibility Study (RI/FS) process, elements and techniques guidance

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    This manual provides detailed guidance on Remedial Investigation/Feasibility Studies (RI/FSs) conducted pursuant to the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) at Department of Energy (DOE) facilities. The purpose of the RI/FS, to assess the risk posed by a hazardous waste site and to determine the best way to reduce that risk, and its structure (site characterization, risk assessment, screening and detailed analysis of alternatives, etc.) is defined in the National Oil and Hazardous Substances Pollution Contingency Plan (NCP) and further explained in the Environmental Protection Agency`s (EPA`s) Guidance for Conducting Remedial Investigations and Feasibility Studies Under CERCLA (Interimmore » Final) 540/G-89/004, OSWER Directive 9355.3-01, October 1988. Though issued in 1988, the EPA guidance remains an excellent source of information on the conduct and structure of an RI/FS. This document makes use of supplemental RI/FS-related guidance that EPA has developed since its initial document was issued in 1988, incorporates practical lessons learned in more than 12 years of experience in CERCLA hazardous site remediation, and drawing on those lessons, introduces the Streamlined Approach For Environmental Restoration (SAFER), developed by DOE as a way to proceed quickly and efficiently through the RI/FS process at DOE facilities. Thus as its title implies, this guidance is intended to describe in detail the process and component elements of an RI/FS, as well as techniques to manage the RI/FS effectively.« less

  17. Proceedings: Conference on Compensatory/Remedial Education, May 16 and 17, 1974. Occasional Paper No. 23.

    ERIC Educational Resources Information Center

    Fea, Henry R., Ed.; And Others

    Two papers given at a conference on compensatory/remedial education are provided. The first paper, "How to Plan a Developmental English Program with College-Wide Cooperation" by Edith A. Freligh, discusses the hypothesis that certain kinds of personalities are attracted to certain kinds of disciplines, applying it to teachers, students, and…

  18. Superfund record of decision (EPA Region 3): Stanley Kessler Superfund Site, King of Prussia, PA, September 1994

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1994-09-29

    This decision document presents the final selected remedial action for the Stanley Kessler Superfund Site (the Site). The selected remedy for the Site will restore contaminated ground water to its beneficial use by cleaning up the ground water to background levels as established by EPA or the appropriate Maximum Contaminant Levels or non-zero Maximum Contaminant Level Goals established under the Federal Safe Drinking Water Act whichever is more stringent. The selected remedy is the only planned action for the Site.

  19. Superfund record of decision (EPA Region 2): Hercules Incorporated (Gibbstown Plant), Solid Waste Disposal Area, Operable Unit 3, Greenwich Township, Gloucester County, NJ, January 22, 1966

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1996-10-01

    This decision document presents the selected remedial action for the Solid Waste Disposal Area (SWDA) - Operable Unit 3, Hercules Incorporated, Higgins Plant (hereinafter Hercules site or site), in Greenwhich Township, Gloucester County, New Jersey. The Record of Decision (ROD) addresses all contaminated media at the SWDA portion of the site including soil and ground water. The selected remedy is a modified version of the `In-Place Containment` remedy of the Porposed Plan.

  20. Initial Results from the Third Round of Remediated Nitrate Salt Surrogate Formulation and Testing

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Brown, Geoffrey Wayne; Leonard, Philip; Hartline, Ernest Leon

    2016-04-20

    High explosives science and technology (M-7) is currently working on the third round of formulation and testing of Remediated nitrate salt (RNS) surrogates. This report summarizes the calorimetry results from the 15% sWheat mixtures. All formulation and testing was carried out according to PLAN-TA9-2443 Rev B, "Remediated Nitrate Salt (RNS) surrogate formulation and testing standard procedure", released February 16, 2016. Results from the first and second rounds of formulation and testing were documented in memoranda M7-16-6042 and M7-16-6053.

  1. Feasibility study concerning remediation and rehabilitation of industrial polluted lands on the Absheron Peninsula, Republic of Azerbaijan

    NASA Astrophysics Data System (ADS)

    Pivin, Majorie; Helsen, Stefan; Cuyvers, Lars

    2014-05-01

    ECOREM is carrying out a feasibility study focused on the remediation and rehabilitation of industrial polluted lands, located on the Absheron Peninsula (Republic of Azerbaijan), on behalf of the State Oil Company of Azerbaijan Republic (SOCAR). The objective of this study is to support SOCAR with specific technologies and capacity building for environmental remediation works on various sectors of the Peninsula. As an independent consultancy company, ECOREM provides sustainable and quality advice, seeking the balance to the interests of the client and the environment in the broadest sense of the word. Within this study, it is important to underline that extraction activities in the country have been going on for more than a century. Given that the age of the environmental problems is equal to the history of the oil production, it is nearly impossible to point out the responsibilities of the various companies or to define the exact activities that occurred on a particular location. From the data gathered so far, more than 3600 ha of oil contaminated area are known in Baku and the Absheron Peninsula. Within this feasibility study, ECOREM will advice SOCAR on suitable and best available remediation technologies to apply on prior contaminated areas. According to the Environmental Policy of the Company, SOCAR would like to act in priority on the numerous contaminated lands of the Absheron Peninsula. Through the exploitation of the extensive GIS database provided by SOCAR, the oil contaminated sites will be examined in details in order to determine the most sensitive areas, on which remediation works or monitoring should be implemented in priority. To locate these sites, ECOREM will provide SOCAR with technical support in order to conduct risk analysis, remediation and monitoring of soil and/or groundwater oil pollutions. According to these results, practical solutions will be proposed concerning the possible reuse and management of contaminated soils and hazardous wastes in the local area and industrial sites where a known risk (for health or ecosystems) is demonstrated. Various aspects are being considered to prioritize needed actions. The client will be informed on the existing remediation technologies and their applicability on the concerned lands, not only taking into account the pollution extent and local geology, but also the operation costs, and existing technical means of SOCAR and the country. With this knowledge as a starting point, ECOREM p.l.c. will strive to offer the most recent, innovative and customized solutions to advice SOCAR with the best available techniques for oil-contaminated land remediation and rehabilitation, in order to reduce the environmental externalities associated with the extraction activities. As a final aspect of this study, ECOREM will help SOCAR with the further development of their Strategic Action Plan for remediation and monitoring. Specific remediation measures will be defined in a realistic time schedule. Each and every stage of the proposed remediation technologies will be implemented in a realistic plan that needs to be technically and economically feasible for SOCAR.

  2. A virtual fluoroscopy system to verify seed positioning accuracy during prostate permanent seed implants.

    PubMed

    Sarkar, V; Gutierrez, A N; Stathakis, S; Swanson, G P; Papanikolaou, N

    2009-01-01

    The purpose of this project was to develop a software platform to produce a virtual fluoroscopic image as an aid for permanent prostate seed implants. Seed location information from a pre-plan was extracted and used as input to in-house developed software to produce a virtual fluoroscopic image. In order to account for differences in patient positioning on the day of treatment, the user was given the ability to make changes to the virtual image. The system has been shown to work as expected for all test cases. The system allows for quick (on average less than 10 sec) generation of a virtual fluoroscopic image of the planned seed pattern. The image can be used as a verification tool to aid the physician in evaluating how close the implant is to the planned distribution throughout the procedure and enable remedial action should a large deviation be observed.

  3. Liability for managed care decisions: the Employee Retirement Income Security Act (ERISA) and the uneven playing field.

    PubMed

    Mariner, W K

    1996-06-01

    As managed care organizations expand their programs of quality assurance and physician evaluation, more medical malpractice lawsuits may be brought against managed care organizations on the ground that, like hospitals, they are legally responsible for negligent corporate acts that injure patients. However, the federal Employee Retirement Income Security Act (ERISA) shields managed care organizations from liability when they are part of an employee group health plan governed by ERISA. Unlike patients with other types of insurance, patients in ERISA health plans do not have a malpractice remedy for a managed care organization's negligence. A few federal appeals courts recently recognized that ERISA plans can be vicariously liable for their physicians' medical malpractice, but only if the physician is the plan's employee or agent. Yet ERISA still prohibits negligence claims against ERISA health plans for injuries resulting from denial of plan benefits, failure to use qualified physicians, utilization review, or improper plan administration. Current managed care operations do not neatly distinguish between administering benefits and controlling quality of care. Neither should the law. ERISA should be amended to provide employees with the same remedies that patients in non-ERISA plans enjoy.

  4. Liability for managed care decisions: the Employee Retirement Income Security Act (ERISA) and the uneven playing field.

    PubMed Central

    Mariner, W K

    1996-01-01

    As managed care organizations expand their programs of quality assurance and physician evaluation, more medical malpractice lawsuits may be brought against managed care organizations on the ground that, like hospitals, they are legally responsible for negligent corporate acts that injure patients. However, the federal Employee Retirement Income Security Act (ERISA) shields managed care organizations from liability when they are part of an employee group health plan governed by ERISA. Unlike patients with other types of insurance, patients in ERISA health plans do not have a malpractice remedy for a managed care organization's negligence. A few federal appeals courts recently recognized that ERISA plans can be vicariously liable for their physicians' medical malpractice, but only if the physician is the plan's employee or agent. Yet ERISA still prohibits negligence claims against ERISA health plans for injuries resulting from denial of plan benefits, failure to use qualified physicians, utilization review, or improper plan administration. Current managed care operations do not neatly distinguish between administering benefits and controlling quality of care. Neither should the law. ERISA should be amended to provide employees with the same remedies that patients in non-ERISA plans enjoy. PMID:8659664

  5. WAG 2 remedial investigation and site investigation site-specific work plan/health and safety checklist for the sediment transport modeling task

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Holt, V.L.; Baron, L.A.

    1994-05-01

    This site-specific Work Plan/Health and Safety Checklist (WP/HSC) is a supplement to the general health and safety plan (HASP) for Waste Area Grouping (WAG) 2 remedial investigation and site investigation (WAG 2 RI&SI) activities [Health and Safety Plan for the Remedial Investigation and Site Investigation of Waste Area Grouping 2 at the Oak Ridge National Laboratory, Oak Ridge, Tennessee (ORNL/ER-169)] and provides specific details and requirements for the WAG 2 RI&SI Sediment Transport Modeling Task. This WP/HSC identifies specific site operations, site hazards, and any recommendations by Oak Ridge National Laboratory (ORNL) health and safety organizations [i.e., Industrial Hygiene (IH),more » Health Physics (HP), and/or Industrial Safety] that would contribute to the safe completion of the WAG 2 RI&SI. Together, the general HASP for the WAG 2 RI&SI (ORNL/ER-169) and the completed site-specific WP/HSC meet the health and safety planning requirements specified by 29 CFR 1910.120 and the ORNL Hazardous Waste Operations and Emergency Response (HAZWOPER) Program Manual. In addition to the health and safety information provided in the general HASP for the WAG 2 RI&SI, details concerning the site-specific task are elaborated in this site-specific WP/HSC, and both documents, as well as all pertinent procedures referenced therein, will be reviewed by all field personnel prior to beginning operations.« less

  6. Annual monitoring report for the Gunnison, Colorado, wetlands mitigation plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1995-10-01

    The US Department of Energy (DOE) administers the Uranium Mill Tailings Remedial Action (UMTRA) Project to clean up uranium mill tailings and other surface contamination at 24 abandoned uranium mill sites in 10 states. One of these abandoned mill sites is near the town of Gunnison, Colorado; surface remediation and the environmental impacts of remedial action are described in the Gunnison environmental assessment (EA) (DOE, 1992). Remedial action resulted in the elimination of 4.3 acres (ac) 1.7 hectares (ha) of wetlands and mitigation of this loss of wetlands is being accomplished through the enhance of 18.4 ac (7.5 ha) ofmore » riparian plant communities in six spring feed areas on Bureau of Land Management (BLM) land. The description of the impacted and mitigation wetlands is provided in the Mitigation and Monitoring Plan for Impacted Wetlands at the Gunnison UMTRA Project Site, Gunnison, Colorado (DOE, 1994), which is attached to the US Army corps of Engineers (USACE) Section 404 Permit. As part of the wetlands mitigation plan, the six mitigation wetlands were fenced in the fall of 1993 to exclude livestock grazing. Baseline of grazed conditions of the wetlands vegetation was determined during the summer of 1993 (DOE, 1994). A 5-year monitoring program of these six sites has been implemented to document the response of vegetation and wildlife to the exclusion of livestock. This annual monitoring report provides the results of the first year of the 5-year monitoring period.« less

  7. 40 CFR 35.6055 - State-lead pre-remedial Cooperative Agreements.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... safety plan. (i) Before beginning field work, the recipient must have a health and safety plan in place..., but must be made available to EPA upon request. (ii) The recipient's health and safety plan must comply with Occupational Safety and Health Administration (OSHA) 29 CFR 1910.120, entitled “Hazardous...

  8. Remedial, Basic, Advanced: Evolving Frameworks for First-Year Composition at the California State University

    ERIC Educational Resources Information Center

    Melzer, Dan

    2015-01-01

    In this essay I conduct a Critical Discourse Analysis of the language surrounding the California State University (CSU) Chancellor's Office latest plan to curb remediation, the Early Start program. I consider Early Start in the context of what I argue is the evolution of three major frameworks for Basic Writing in the CSU: the CSU Chancellor's…

  9. Operable Unit 7-13/14 in situ thermal desorption treatability study work plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Shaw, P.; Nickelson, D.; Hyde, R.

    1999-05-01

    This Work Plan provides technical details for conducting a treatability study that will evaluate the application of in situ thermal desorption (ISTD) to landfill waste at the Subsurface Disposal Area (SDA) at the Idaho National Engineering and Environmental Laboratory (INEEL). ISTD is a form of thermally enhanced vapor vacuum extraction that heats contaminated soil and waste underground to raise its temperature and thereby vaporize and destroy most organics. An aboveground vapor vacuum collection and treatment system then destroys or absorbs the remaining organics and vents carbon dioxide and water to the atmosphere. The technology is a byproduct of an advancedmore » oil-well thermal extraction program. The purpose of the ISTD treatability study is to fill performance-based data gaps relative to off-gas system performance, administrative feasibility, effects of the treatment on radioactive contaminants, worker safety during mobilization and demobilization, and effects of landfill type waste on the process (time to remediate, subsidence potential, underground fires, etc.). By performing this treatability study, uncertainties associated with ISTD as a selected remedy will be reduced, providing a better foundation of remedial recommendations and ultimate selection of remedial actions for the SDA.« less

  10. Societal constraints related to environmental remediation and decommissioning programmes.

    PubMed

    Perko, Tanja; Monken-Fernandes, Horst; Martell, Meritxell; Zeleznik, Nadja; O'Sullivan, Patrick

    2017-06-20

    The decisions related to decommissioning or environmental remediation projects (D/ER) cannot be isolated from the socio-political and cultural environment. Experiences of the IAEA Member States point out the importance of giving due attention to the societal aspects in project planning and implementation. The purpose of this paper is threefold: i) to systematically review societal constraints that some organisations in different IAEA Member States encounter when implementing D/ER programmes, ii) to identify different approaches to overcome these constraints and iii) to collect examples of existing practices related to the integration of societal aspects in D/ER programmes worldwide. The research was conducted in the context of the IAEA project Constraints to Decommissioning and Environmental Remediation (CIDER). The research results show that societal constraints arise mostly as a result of the different perceptions, attitudes, opinions and concerns of stakeholders towards the risks and benefits of D/ER programmes and due to the lack of stakeholder involvement in planning. There are different approaches to address these constraints, however all approaches have common points: early involvement, respect for different views, mutual understanding and learning. These results are relevant for all on-going and planned D/ER programmes. Copyright © 2017 Elsevier Ltd. All rights reserved.

  11. Field Sampling Plan for Closure of the Central Facilities Area Sewage Treatment Plant Lagoon 3 and Land Application Area

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lewis, Michael George

    This field sampling plan describes sampling of the soil/liner of Lagoon 3 at the Central Facilities Area Sewage Treatment Plant. The lagoon is to be closed, and samples obtained from the soil/liner will provide information to determine if Lagoon 3 and the land application area can be closed in a manner that renders it safe to human health and the environment. Samples collected under this field sampling plan will be compared to Idaho National Laboratory background soil concentrations. If the concentrations of constituents of concern exceed the background level, they will be compared to Comprehensive Environmental Response, Compensation, and Liabilitymore » Act preliminary remediation goals and Resource Conservation and Recovery Act levels. If the concentrations of constituents of concern are lower than the background levels, Resource Conservation and Recovery Act levels, or the preliminary remediation goals, then Lagoon 3 and the land application area will be closed. If the Resource Conservation and Recovery Act levels and/or the Comprehensive Environmental Response, Compensation, and Liability Act preliminary remediation goals are exceeded, additional sampling and action may be required.« less

  12. Site Remediation Technology InfoBase: A Guide to Federal Programs, Information Resources, and Publications on Contaminated Site Cleanup Technologies. First Edition

    NASA Technical Reports Server (NTRS)

    1998-01-01

    Table of Contents: Federal Cleanup Programs; Federal Site Remediation Technology Development Assistance Programs; Federal Site Remediation Technology Development Electronic Data Bases; Federal Electronic Resources for Site Remediation Technology Information; Other Electronic Resources for Site Remediation Technology Information; Other Electronic Resources for Site Remediation Technology Information; Selected Bibliography: Federal Publication on Alternative and Innovative Site Remediation; and Appendix: Technology Program Contacts.

  13. Base Realignment and Closure (BRAC) Cleanup Plan for Fort Devens, Fort Devens, Massachusetts

    DTIC Science & Technology

    1994-04-07

    Landfill (AOCs 4, 5, 18, and 40) were identified in the MEP as the highest priority (Priority 1A) for remediation. As such, these sites proceeded...Spring Brook Landfills OUs, etc. 4.1.4 Environmental Restoration Early Actions Strategy The Site Investigation (SI) Data Package concept was developed...Approach for the Shepley’ s Hill and Cold Spring Brook Landfill Sites . Fort Devens. Massachusetts, prepared for USAEC; February. Ecology & Environment

  14. Estimated Chemical Warfare Agent Surface Clearance Goals for Remediation Pre-Planning

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Dolislager, Frederick; Bansleben, Dr. Donald; Watson, Annetta Paule

    2010-01-01

    Health-based surface clearance goals, in units of mg/cm2, have been developed for the persistent chemical warfare agents sulfur mustard (HD) and nerve agent VX as well as their principal degradation products. Selection of model parameters and critical receptor (toddler child) allow calculation of surface residue estimates protective for the toddler child, the general population and adult employees of a facilty that has undergone chemical warfare agent attack.

  15. Implementing cognitive remediation and social cognitive interaction training into standard psychosis care.

    PubMed

    Dark, Frances; Harris, Meredith; Gore-Jones, Victoria; Newman, Ellie; Whiteford, Harvey

    2018-06-15

    To evaluate the planned implementation of group based Cognitive Remediation therapy (CR) and Social Cognitive Interaction Training (SCIT) into routine psychosis care in a mental health service in Australia. The study was conducted over 3 years in a mental health service in a metropolitan city in Australia. Participants were 22 program facilitators and 128 patients attending the programs. Implementation outcomes were assessed using administrative data, staff surveys and program audits. There was fidelity to the particular therapies at a program level. Programs were assessed as being feasible within the study setting with each hospital district developing a capacity to run CR and SCIT. The establishment of new programs improved the reach, but waiting lists indicate a need to expand capacity. There was a relatively high dropout and several factors impacted on completion of the programs - notably, acute exacerbation of psychosis. Once initiated the therapies were acceptable with no-one ceasing SCIT due to loss of interest and only 10% of participants ceasing CR due to loss of interest. Annual audits of programs found programs established were maintained and facilitators were retained. SCIT and CR programs were successfully implemented in three hospital districts. Several factors impeded participants receiving the recommended "dose" of the programs. The maintenance of the programs in the short term is encouraging in regards to organisational fit. Dissemination of cognitive rehabilitation programs to a service population takes planning. An implementation plan is essential for guiding development and maintenance of programs. These therapies are best suited to people in a stable phase of illness. Service user co-production is recommended to improve recruitment in future studies.

  16. Comprehensive implementation plan for the DOE defense buried TRU- contaminated waste program

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Everette, S.E.; Detamore, J.A.; Raudenbush, M.H.

    1988-02-01

    In 1970, the US Atomic Energy Commission established a transuranic'' (TRU) waste classification. Waste disposed of prior to the decision to retrievably store the waste and which may contain TRU contamination is referred to as buried transuranic-contaminated waste'' (BTW). The DOE reference plan for BTW, stated in the Defense Waste Management Plan, is to monitor it, to take such remedial actions as may be necessary, and to re-evaluate its safety as necessary or in about 10-year periods. Responsibility for management of radioactive waste and byproducts generated by DOE belongs to the Secretary of Energy. Regulatory control for these sites containingmore » mixed waste is exercised by both DOE (radionuclides) and EPA (hazardous constituents). Each DOE Operations Office is responsible for developing and implementing plans for long-term management of its radioactive and hazardous waste sites. This comprehensive plan includes site-by-site long-range plans, site characteristics, site costs, and schedules at each site. 13 figs., 15 tabs.« less

  17. Helping Struggling Teachers.

    ERIC Educational Resources Information Center

    Tucker, Pamela

    2001-01-01

    About 5 to 15 percent of teachers in 2.7 million public-education classrooms are marginal or incompetent. Assistance plans offer structure, purpose, and remedial help. Plans have six components: definition of the problem, statement of objectives, intervention strategies, a timeline, data-collection procedures, and final judgment. (MLH)

  18. Draft final feasibility study report and proposed plan for Operable Unit 4, response to comments: Fernald Environmental Management Project, Fernald, Ohio

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1994-02-01

    This report contains questions and comments regarding a risk evaluation and possible remedial action of Operable Unit 4 at the Feed Materials Production Center at Fernald, Ohio. Attention is focused on the US EPA Region V feasibility study and on the CRARE. The CRARE is a post-remediation time frame document.

  19. 30 CFR 582.14 - Noncompliance, remedies, and penalties.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... Section 582.14 Mineral Resources BUREAU OF OCEAN ENERGY MANAGEMENT, DEPARTMENT OF THE INTERIOR OFFSHORE...; other applicable regulations; the lease; the approved Delineation, Testing, or Mining Plan; or the... applicable regulations; the lease; the requirements of an approved Delineation, Testing, or Mining Plan; or...

  20. 30 CFR 282.14 - Noncompliance, remedies, and penalties.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Section 282.14 Mineral Resources BUREAU OF OCEAN ENERGY MANAGEMENT, REGULATION, AND ENFORCEMENT... Delineation, Testing, or Mining Plan; or the Director's orders or instructions, and the Director determines... requirements of an approved Delineation, Testing, or Mining Plan; or the Director's orders or instructions, and...

  1. 30 CFR 582.14 - Noncompliance, remedies, and penalties.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... Section 582.14 Mineral Resources BUREAU OF OCEAN ENERGY MANAGEMENT, DEPARTMENT OF THE INTERIOR OFFSHORE...; other applicable regulations; the lease; the approved Delineation, Testing, or Mining Plan; or the... applicable regulations; the lease; the requirements of an approved Delineation, Testing, or Mining Plan; or...

  2. 30 CFR 582.14 - Noncompliance, remedies, and penalties.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Section 582.14 Mineral Resources BUREAU OF OCEAN ENERGY MANAGEMENT, DEPARTMENT OF THE INTERIOR OFFSHORE...; other applicable regulations; the lease; the approved Delineation, Testing, or Mining Plan; or the... applicable regulations; the lease; the requirements of an approved Delineation, Testing, or Mining Plan; or...

  3. 30 CFR 282.14 - Noncompliance, remedies, and penalties.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... OPERATIONS IN THE OUTER CONTINENTAL SHELF FOR MINERALS OTHER THAN OIL, GAS, AND SULPHUR Jurisdiction and...; other applicable regulations; the lease; the approved Delineation, Testing, or Mining Plan; or the... applicable regulations; the lease; the requirements of an approved Delineation, Testing, or Mining Plan; or...

  4. Tank waste remediation system tank waste retrieval risk management plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Klimper, S.C.

    1997-11-07

    This Risk Management Plan defines the approach to be taken to manage programmatic risks in the TWRS Tank Waste Retrieval program. It provides specific instructions applicable to TWR, and is used to supplement the guidance given by the TWRS Risk Management procedure.

  5. Mitigation and Monitoring Plan for impacted wetlands at the Gunnison UMTRA Project site, Gunnison, Colorado. Revision 1

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1994-12-01

    The Gunnison, Colorado, abandoned uranium mill site is one site being cleaned up by the DOE under UMTRCA authority. This site`s contaminated material is being transported to a disposal site on US Bureau of Land Management (BLM) land east of Gunnison. Remedial action activities have temporarily disturbed 0.8 acre (ac) (0.3 hectares [ha]) of wetlands and permanently eliminated 4.3 ac (1.7 ha). As required by the Clean Water Act, the US Army Corps of Engineers (USACE) prepared a Section 404 Permit that addresses the loss of wetlands as a result of remedial action at the Gunnison UMTRA Project site. Themore » 404 permit includes this report as an attachment and it describes the wetland mitigation and monitoring plan. The DOE formulated this plan in consultation with the BLM and the USACE. This report represents a revised version of the mitigation and monitoring plan (DOE, 1992b).« less

  6. An assessment of home remedy use by African Americans.

    PubMed

    Boyd, E L; Taylor, S D; Shimp, L A; Semler, C R

    2000-07-01

    This analysis represents the first national look at family and individual use of home remedies by African Americans. The purpose is to examine home remedy usage by African-American individuals and their families and assess the relationship between sociodemographic characteristics and home remedy usage for African-American families and African-American individuals. Using logistic regression, a secondary analysis of the National Survey on Black Americans (NSBA) data (N = 2107) was conducted to examine factors associated with home remedy use. Multivariate analysis indicated that parent's education, importance of religion, living with a grandparent, and living in a rural area were associated with families' use of home remedies. Age, gender, living with a grandparent, education, and geographic region were associated with individual home remedy use. The results of this research may provide insight to health care practitioners in their challenge of appropriately integrating self-care practices (i.e., home remedy use) and the use of the formal health care system among the patients that utilize both "scientific" and "folk" medical systems. When possible, treatment plans should be adapted to consider patients' demographics, health beliefs, and self-care practices. Health care providers should encourage patient and family involvement and dialogue regarding therapeutic approaches. As more information becomes available, health care practitioners will be better able to ascertain the possible health consequences of concurrent usage of home remedies and prescription drug therapies.

  7. Nuclear facility decommissioning and site remedial actions. Volume 6. A selected bibliography

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Owen, P.T.; Michelson, D.C.; Knox, N.P.

    1985-09-01

    This bibliography of 683 references with abstracts on the subject of nuclear facility decommissioning, uranium mill tailings management, and site remedial actions is the sixth in a series of annual reports prepared for the US Department of Energy's Remedial Action Programs. Foreign as well as domestic literature of all types - technical reports, progress reports, journal articles, conference papers, symposium proceedings, theses, books, patents, legislation, and research project descriptions - has been included. The bibliography contains scientific (basic research as well as applied technology), economic, regulatory, and legal literature pertinent to the US Department of Energy's remedial action program. Majormore » chapters are: (1) Surplus Facilities Management Program; (2) Nuclear Facilities Decommissioning; (3) Formerly Utilized Sites Remedial Action Program; (4) Facilities Contaminated with Natural Radioactivity; (5) Uranium Mill Tailings Remedial Action Program; (6) Grand Junction Remedial Action Program; (7) Uranium Mill Tailings Management; (8) Technical Measurements Center; and (9) General Remedial Action Program Studies. Chapter sections for chapters 1, 2, 5, and 7 include Design, Planning, and Regulations; Environmental Studies and Site Surveys; Health, Safety, and Biomedical Studies; Decontamination Studies; Dismantlement and Demolition; Site Stabilization and Reclamation; Waste Disposal; Remedial Action Experience; and General Studies. The references within each chapter or section are arranged alphabetically by leading author. References having no individual author are arranged by corporate affiliation or by publication description.« less

  8. Fraud and fiduciary liability.

    PubMed

    Hodge, Brian Ray

    2003-12-01

    All employee benefit plans are potential targets of fraudulent schemes. Smaller plans are targeted by unscrupulous brokers and promoters selling fraudulent policies; plans large enough to be self-insured face greater risks of fraud by providers and participants misrepresenting claims. Plan trustees, administrators and consultants should be alert to the many ways fraudulent schemes manifest themselves and to the legal remedies available; establish investigative programs to detect and discourage fraud; and promote education and plan incentives for participants to report fraud.

  9. Comprehensive Nuclear-Test-Ban Treaty: Background and Current Developments

    DTIC Science & Technology

    2009-11-23

    there are no plans to do so.’”5 Critics expressed concern about the implications of these policies for testing and new weapons. A statement by...opportunity to design and build new nuclear weapons, and abandon a ten-year-old moratorium on nuclear weapons testing.”6 Another critic felt that increased...cannot diagnose or remedy a problem in a warhead critical the U.S. nuclear deterrent without conducting a nuclear test.10 Similarly, a Statement of

  10. Developing a strategy and closure criteria for radioactive and mixed waste sites in the ORNL remedial action program: Regulatory interface

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Trabalka, J.R.

    1987-09-01

    Some options for stabilization and treatment of contaminated sites can theoretically provide a once-and-for-all solution (e.g., removal or destruction of contaminants). Most realizable options, however, leave contaminants in place (in situ), potentially isolated by physical or chemical, but more typically, by hydrologic measures. As a result of the dynamic nature of the interactions between contaminants, remedial measures, and the environment, in situ stablization measures are likely to have limited life spans, and maintenance and monitoring of performance become an essential part of the scheme. The length of formal institutional control over the site and related questions about future uses ofmore » the land and waters are of paramount importance. Unique features of the ORNL site and environs appear to be key ingredients in achieving the very long term institutional control necessary for successful financing and implementation of in situ stabilization. Some formal regulatory interface is necessary to ensure that regulatory limitations and new guidance which can affect planning and implementation of the ORNL Remedial Action Program are communicated to ORNL staff and potential technical and financial limitations which can affect schedules or alternatives for achievement of long-term site stabilization and the capability to meet environmental regulations are provided to regulatory bodies as early as possible. Such an interface should allow decisions on closure criteria to be based primarily on technical merit and protection of human health and the environment. A plan for interfacing with federal and state regulatory authorities is described. 93 refs., 1 fig., 4 tabs.« less

  11. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kupar, J.; Hasek, M.

    The Sanitary Landfill Corrective Action Plan proposes a two pronged approach to remediation. The first part of the total remediation strategy is the placement of a RCRA style closure cap to provide source control of contaminants into the groundwater. The second part of the proposed remediation package is a phased approach primarily using an in situ bioremediation system for groundwater clean up of the Constituents of Concern (COCs) that exceed their proposed Alternate Concentration Limits (ACL). The phased in approach of groundwater clean up will involve operation of the in situ bioremediation system, followed by evaluation of the Phase 1more » system and, if necessary, additional phased remediation strategies. This document presents pertinent information on operations, well locations, anticipated capture zones, monitoring strategies, observation wells and other information which will allow a decision on the acceptability of the remedial strategy as an interim corrective action prior to permit application approval. The proposed interim phase of the remediation program will position two horizontal bioremediation wells such that the respective zones of influence will intersect the migration path for the highest concentrations of each plume.« less

  12. Remedial investigation work plan for Bear Creek Valley Operable Unit 4 (shallow groundwater in Bear Creek Valley) at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1993-07-01

    To effectively evaluate the cumulative impact of releases from multiple sources of contamination, a structured approach has been adopted for Oak Ridge Reservation (ORR) based on studies of the groundwater and surface water separate from studies of the sources. Based on the realization of the complexity of the hydrogeologic regime of the ORR, together with the fact that there are numerous sources contributing to groundwater contamination within a geographical area, it was agreed that more timely investigations, at perhaps less cost, could be achieved by separating the sources of contamination from the groundwater and surface water for investigation and remediation.more » The result will be more immediate attention [Records of Decision (RODs) for interim measures or removal actions] for the source Operable Units (OUs) while longer-term remediation investigations continue for the hydrogeologic regimes, which are labeled as integrator OUs. This remedial investigation work plan contains summaries of geographical, historical, operational, geological, and hydrological information specific to the unit. Taking advantage of the historical data base and ongoing monitoring activities and applying the observational approach to focus data gathering activities will allow the feasibility study to evaluate all probable or likely alternatives.« less

  13. Remedial Investigation work plan for Bear Creek Valley Operable Unit 4 (shallow groundwater in Bear Creek Valley) at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1993-09-01

    To effectively evaluate the cumulative impact of releases from multiple sources of contamination, a structured approach has been adopted for Oak Ridge Reservation (ORR) based on studies of the groundwater and surface water separate from studies of the sources. Based on the realization of the complexity of the hydrogeologic regime of the ORR, together with the fact that there are numerous sources contributing to groundwater contamination within a geographical area, it was agreed that more timely investigations, at perhaps less cost, could be achieved by separating the sources of contamination from the groundwater and surface water for investigation and remediation.more » The result will be more immediate attention [Records of Decision (RODS) for interim measures or removal actions] for the source Operable Units (OUs) while longer-term remediation investigations continue for the hydrogeologic regime`s, which are labeled as integrator OUs. This Remedial Investigation work plan contains summaries of geographical, historical, operational, geological, and hydrological information specific to the unit. Taking advantage of the historical data base and ongoing monitoring activities and applying the observational approach to focus data gathering activities will allow the Feasibility Study to evaluate all probable or likely alternatives.« less

  14. COMPENSATORY EDUCATION PROGRAM. NEWSLETTER.

    ERIC Educational Resources Information Center

    Fresno City Unified School District, CA.

    TWO NEWSLETTERS FROM THE COMPENSATORY EDUCATION PROGRAM IN FRESNO INCLUDED PLANS FOR THE PLANNING GRANT PROGRAM, THE BASIC PROGRAM, AND THE INTENSIVE PROGRAM. THE BASIC PROGRAM SHOULD REDUCE PUPIL-TEACHER RATIO, PROVIDE PRESCHOOL PROJECTS THROUGH THE USE OF EITHER SCHOOL FACILITIES OR PRIVATE FACILITIES, PROVIDE REMEDIAL AND CORRECTIVE PROGRAMS IN…

  15. Multidisciplinary investigation of the fate, transport, and remediation of chlorinated solvents in fractured rocks at the former Naval Air Warfare Center (NAWC): Scientific and management challenges, and strategies for a successful research program

    NASA Astrophysics Data System (ADS)

    Tiedeman, C. R.; Goode, D. J.; Shapiro, A. M.; Lacombe, P. J.; Chapelle, F. H.; Bradley, P. M.; Imbrigiotta, T. E.; Williams, J. H.; Curtis, G. P.; Hsieh, P. A.

    2008-12-01

    At the former Naval Air Warfare Center (NAWC) in West Trenton NJ, the U.S. Geological Survey, in cooperation with the U.S. Navy and under support from the Strategic Environmental Research and Development Program (SERDP), is investigating the fate, transport, and remediation of trichloroethylene (TCE) and its daughter products in dipping, fractured mudstones underlying the site. TCE concentrations in ground water are as high as ~100 mg/L. Objectives of multidisciplinary research at the NAWC include (1) understanding the physical, chemical, and microbiological processes and properties affecting the fate, transport, and removal of chlorinated solvents in fractured rocks, (2) assessing the efficiency of different remediation methods (pump and treat, natural and enhanced biodegradation), and (3) transferring the results to help remediate other contaminated fractured rock aquifers. There are numerous scientific and technical challenges to meeting these goals, including the extreme spatial variability of flow and transport properties at the NAWC and the complex distribution of contaminants, geochemical constituents, and microorganisms in fractures and the rock matrix. In addition, there are management challenges that are equally important to address in order to achieve a successful research program. These include balancing the requirements of the many parties involved at the site, including researchers, the site owner, and regulatory agencies; and ensuring that limited research funds are directed towards work that addresses the most important scientific questions as well as stakeholder concerns. Strategies for the scientific challenges at NAWC include developing a carefully planned program to characterize spatial variability in rock properties and groundwater constituents so that the data obtained are applicable to solving research questions focused on remediation. Strategies for the management challenges include fostering open lines of communication among all parties and conferring with the U.S. Environmental Protection Agency to ensure that our research is relevant to remediation at Superfund and other hazardous waste sites with chlorinated solvent contamination of fractured rocks.

  16. Coupling a continuous watershed-scale microbial fate and transport model with a stochastic dose-response model to estimate risk of illness in an urban watershed.

    PubMed

    Liao, Hehuan; Krometis, Leigh-Anne H; Kline, Karen

    2016-05-01

    Within the United States, elevated levels of fecal indicator bacteria (FIB) remain the leading cause of surface water-quality impairments requiring formal remediation plans under the federal Clean Water Act's Total Maximum Daily Load (TMDL) program. The sufficiency of compliance with numerical FIB criteria as the targeted endpoint of TMDL remediation plans may be questionable given poor correlations between FIB and pathogenic microorganisms and varying degrees of risk associated with exposure to different fecal pollution sources (e.g. human vs animal). The present study linked a watershed-scale FIB fate and transport model with a dose-response model to continuously predict human health risks via quantitative microbial risk assessment (QMRA), for comparison to regulatory benchmarks. This process permitted comparison of risks associated with different fecal pollution sources in an impaired urban watershed in order to identify remediation priorities. Results indicate that total human illness risks were consistently higher than the regulatory benchmark of 36 illnesses/1000 people for the study watershed, even when the predicted FIB levels were in compliance with the Escherichia coli geometric mean standard of 126CFU/100mL. Sanitary sewer overflows were associated with the greatest risk of illness. This is of particular concern, given increasing indications that sewer leakage is ubiquitous in urban areas, yet not typically fully accounted for during TMDL development. Uncertainty analysis suggested the accuracy of risk estimates would be improved by more detailed knowledge of site-specific pathogen presence and densities. While previous applications of the QMRA process to impaired waterways have mostly focused on single storm events or hypothetical situations, the continuous modeling framework presented in this study could be integrated into long-term water quality management planning, especially the United States' TMDL program, providing greater clarity to watershed stakeholders and decision-makers. Copyright © 2016 Elsevier B.V. All rights reserved.

  17. Superfund Record of Decision (EPA Region 7): Cornhusker Army Ammunition Plant, Operable Unit 2, Hall County, NE, September 30, 1998

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1999-03-01

    This Record of Decision (ROD) document presents the selected remedial action for the six areas of concern (AOCs) located at the Cornhusker Army Ammunition Plant (CHAAP) in Grand Island, Nebraska designated as OU2. The remedial action is chosen in accordance with the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERLCA), as amended by the Superfund Amendments and Reauthorization Act (SARA) of 1986, and with the National Oil and Hazardous Substances Pollution Contingency Plan (NCP). The information supporting the decisions contained in the remedy is contained in the administrative record.

  18. Summary of a Gas Transport Tracer Test in the Deep Cerros Del Rio Basalts, Mesita del Buey, Los Alamos NM.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Stauffer, Philip H.; Rahn, Thomas A.; Ortiz, John Philip

    Here we describe results from a tracer test in the Cerros del Rio basalt beneath Mesita del Buey, Technical Area 54 (TA-54) at Los Alamos National Laboratory (LANL or the Laboratory). This report follows from plans outlined in our previous Tracer Test Work Plan (LANL 2016). These activities were conducted by LANL to further characterize subsurface properties of the Cerros del Rio basalts at Material Disposal Area (MDA) L (Figure 1.1-1). The work presented follows from the “Interim Measures Work Plan for Soil-Vapor Extraction of Volatile Organic Compounds from Material Disposal Area L, Technical Area 54, Revision 1,” submitted tomore » the New Mexico Environment Department (NMED) in September 2014 (LANL 2014). Remediation of the MDA L vapor plume by soil-vapor extraction (SVE) is recommended as part of the final remedy in the “Corrective Measures Evaluation Report for Material Disposal Area L, Solid Waste Management Unit 54-006, at Technical Area 54, Revision 2” to meet a remedial action objective of preventing groundwater from being impacted above a regulatory standard by the transport of volatile organic compounds (VOCs) to groundwater through soil vapor (LANL 2011).« less

  19. Is Sustainable Remediation Now a Self-Sustaining Process? an International Progress Report

    NASA Astrophysics Data System (ADS)

    Smith, J. W. N.

    2014-12-01

    Sustainable remediation - the consideration of environmental, social and economic factors associated with soil and groundwater risk-management options, to help select the best overall solution - has been a rapidly evolving topic in recent years. The first published reference[1] to 'sustainable remediation' was in the title of a 1999 conference paper by Kearney et al., (1999), but activity really accelerated in the middle-late 2000's, with establishment of a number of collaborative sustainable remediation groups and fora, and increased publication rates in the peer reviewed literature (Fig 1). Figure 1. Journal paper publications with search term 'sustainable remediation' (SCOPUS survey, 17 July 2014) This presentation will review the international progress of sustainable remediation concept development and application in regulatory and corporate decision-making processes. It will look back at what has already been achieved, provide an update on the latest initiatives and developments, and look forward to what the future of sustainable remediation might look like. Specifically it will describe: Sustainable remediation frameworks: synergies and international collaboration; Latest guidance and tools developed by the various sustainable remediation organisations (SuRFs), including the SuRF-UK Best Management Practices and Tier 1 Briefcase; Best practice standard development by ASTM and ISO; Regulatory acceptance of sustainable remediation, including incorporation into legislation, and the NICOLE - Common Forum Joint statement on 'risk-informed and sustainable remediation' in Europe; Examples of corporate adoption of sustainable remediation principles. The presentation will conclude with a look forward to a vision of sustainable remediation in 2020.

  20. Towards automatic planning for manufacturing generative processes

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    CALTON,TERRI L.

    2000-05-24

    Generative process planning describes methods process engineers use to modify manufacturing/process plans after designs are complete. A completed design may be the result from the introduction of a new product based on an old design, an assembly upgrade, or modified product designs used for a family of similar products. An engineer designs an assembly and then creates plans capturing manufacturing processes, including assembly sequences, component joining methods, part costs, labor costs, etc. When new products originate as a result of an upgrade, component geometry may change, and/or additional components and subassemblies may be added to or are omitted from themore » original design. As a result process engineers are forced to create new plans. This is further complicated by the fact that the process engineer is forced to manually generate these plans for each product upgrade. To generate new assembly plans for product upgrades, engineers must manually re-specify the manufacturing plan selection criteria and re-run the planners. To remedy this problem, special-purpose assembly planning algorithms have been developed to automatically recognize design modifications and automatically apply previously defined manufacturing plan selection criteria and constraints.« less

  1. FEASIBILITY STUDY REPORT FOR THE 200-ZP-1 GROUNDWATER OPERABLE UNIT

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    BYRNES ME

    2008-07-18

    The Hanford Site, managed by the U.S. Department of Energy (DOE), encompasses approximately 1,517 km{sup 2} (586 mi{sup 2}) in the Columbia Basin of south-central Washington State. In 1989, the U.S. Environmental Protection Agency (EPA) placed the 100, 200, 300, and 1100 Areas of the Hanford Site on the 40 Code of Federal Regulations (CFR) 300, 'National Oil and Hazardous Substances Pollution Contingency Plan' National Contingency Plan [NCPD], Appendix B, 'National Priorities List' (NPL), pursuant to the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA). The 200 Areas NPL sites consist of the 200 West and 200 Eastmore » Areas (Figure 1-1). The 200 Areas contain waste management facilities, inactive irradiated fuel reprocessing facilities, and the 200 North Area (formerly used for interim storage and staging of irradiated fuel). Several waste sites in the 600 Area, located near the 200 Areas, also are included in the 200 Areas NPL site. The 200 Areas NPL site is in a region referred to as the 'Central Plateau' and consists of approximately 700 waste sites, excluding sites assigned to the tank farm waste management areas (WMAs). The 200-ZP-1 Groundwater Operable Unit (OU) consists of the groundwater located under the northern portion of the 200 West Area. Waste sources that contributed to the 200-ZP-1 OU included cribs and trenches that received liquid and/or solid waste in the past from the Z Plant and T Plant aggregate areas, WMA-T, WMA-TX/TY, and the State-Approved Land Disposal Site (SALDS). This feasibility study (FS) for the 200-ZP-1 Groundwater OU was prepared in accordance with the requirements of CERCLA decision documents. These decision documents are part of the Administrative Record for the selection of remedial actions for each waste site and present the selected remedial actions that are chosen in accordance with CERCLA, as amended by the Superfund Amendments and Reauthorization Act of 1986, and to the extent practicable, the NCP. This FS conforms to the conditions set forth in the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement) (Ecology et al. 2003) and amendments, signed by the Washington State Department of Ecology (Ecology), EPA, and DOE Richland Operations Office (RL). This also includes Tri-Party Agreement Milestone M-015-00C for completing all 200 Area non-tank farm OU pre-Record of Decision (ROD) documents on or before December 31, 2011. This FS supports the final remedy selection for the 200-ZP-1 OU, as described in the Remedial Investigation/Feasibility Study Work Plan for the 200-ZP-1 Groundwater Operable Unit (referred to as the 200-ZP-1 RI/FS work plan) (DOE/RL-2003-55), as agreed upon by RL and EPA. Tri-Party Agreement Milestone M-015-48B required Draft A of the 200-ZP-1 OU FS and proposed plan to be transmitted to EPA by September 30, 2007. As agreed to with EPA in the 200 Area Unit Managers Meeting Groundwater Operable Unit Status (FH-0503130), the baseline risk assessment (BRA) was delayed from inclusion in the remedial investigation (RI) report and is completed and documented in this FS. The Remedial Investigation Report for 200-ZP-1 Groundwater Operable Unit (referred to as the 200-ZP-1 RI report) (DOE/RL-2006-24) included an evaluation of human health and ecological risks and hazards. The RI report identified the radiological and chemical contaminants of potential concern (COPCs) that represent the primary risks to human health and the environment. The complete risk assessment in this FS incorporates additional analytical data from the unconfined aquifer that were obtained during or after preparation of the RI report, particularly for carbon tetrachloride and technetium-99. This FS also includes the initial results from an ongoing study of technetium-99 contamination near WMA-T, the sampling of new wells near the 216-W-LC laundry waste crib and T Plant, updated Hanford vadose zone fate and transport modeling, and groundwater particle-tracking analysis. The purpose of this FS is to develop and evaluate alternatives for remediation of the groundwater in the 200-ZP-1 OU. The alternatives considered provide a range of potential response actions (i.e., no action; institutional controls and monitored natural attenuation [MNA]; and pump-and-treat with MNA, flow-path control, and institutional controls) that are appropriate to address site-specific conditions. The alternatives are evaluated against seven of the nine CERCLA evaluation criteria defined in Guidance for Conducting Remedial Investigations and Feasibility Studies Under CERCLA (EPA/540/G-891004). The remaining two CERCLA criteria will be formally assessed during the public comment period. The FS evaluation serves as the basis for identifying a remedy to mitigate potential risks to human health and the environment. A preferred alternative (or alternatives) will be presented to the public for review and comment in the proposed plan.« less

  2. Tank waste remediation system immobilized high-level waste storage project configuration management implementation plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Burgard, K.G.

    This Configuration Management Implementation Plan was developed to assist in the management of systems, structures, and components, to facilitate the effective control and statusing of changes to systems, structures, and components; and to ensure technical consistency between design, performance, and operational requirements. Its purpose is to describe the approach Project W-464 will take in implementing a configuration management control, to determine the rigor of control, and to identify the mechanisms for imposing that control.This Configuration Management Implementation Plan was developed to assist in the management of systems, structures, and components, to facilitate the effective control and statusing of changes tomore » systems, structures, and components; and to ensure technical consistency between design, performance, and operational requirements. Its purpose is to describe the approach Project W-464 will take in implementing a configuration management control, to determine the rigor of control, and to identify the mechanisms for imposing that control.« less

  3. Design study of RL10 derivatives. Volume 3, part 2: Operational and flight support plan. [analysis of transportation requirements for rocket engine in support of space tug program

    NASA Technical Reports Server (NTRS)

    Shubert, W. C.

    1973-01-01

    Transportation requirements are considered during the engine design layout reviews and maintenance engineering analyses. Where designs cannot be influenced to avoid transportation problems, the transportation representative is advised of the problems permitting remedies early in the program. The transportation representative will monitor and be involved in the shipment of development engine and GSE hardware between FRDC and vehicle manufacturing plant and thereby will be provided an early evaluation of the transportation plans, methods and procedures to be used in the space tug support program. Unanticipated problems discovered in the shipment of development hardware will be known early enough to permit changes in packaging designs and transportation plans before the start of production hardware and engine shipments. All conventional transport media can be used for the movement of space tug engines. However, truck transport is recommended for ready availability, variety of routes, short transit time, and low cost.

  4. Absenteeism, Educational Plans, and Anxiety among Children with Incontinence and Their Parents

    ERIC Educational Resources Information Center

    Filce, Hollie G.; LaVergne, Leslie

    2015-01-01

    Background: Children with incontinence have more absenteeism, poorer academic performance, and potential social difficulties during the school years. These children and their parents are at risk for illness-related anxiety. Whereas educational plans are designed to remediate educational, medical, and social-emotional barriers at school, little…

  5. 24 CFR 907.7 - Remedies for substantial default.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 24 Housing and Urban Development 4 2011-04-01 2011-04-01 false Remedies for substantial default... URBAN DEVELOPMENT SUBSTANTIAL DEFAULT BY A PUBLIC HOUSING AGENCY § 907.7 Remedies for substantial... staff; or (3) Provide assistance deemed necessary, in the discretion of HUD, to remedy emergency...

  6. A Hyperbolic Ontology Visualization Tool for Model Application Programming Interface Documentation

    NASA Technical Reports Server (NTRS)

    Hyman, Cody

    2011-01-01

    Spacecraft modeling, a critically important portion in validating planned spacecraft activities, is currently carried out using a time consuming method of mission to mission model implementations and integration. A current project in early development, Integrated Spacecraft Analysis (ISCA), aims to remedy this hindrance by providing reusable architectures and reducing time spent integrating models with planning and sequencing tools. The principle objective of this internship was to develop a user interface for an experimental ontology-based structure visualization of navigation and attitude control system modeling software. To satisfy this, a number of tree and graph visualization tools were researched and a Java based hyperbolic graph viewer was selected for experimental adaptation. Early results show promise in the ability to organize and display large amounts of spacecraft model documentation efficiently and effectively through a web browser. This viewer serves as a conceptual implementation for future development but trials with both ISCA developers and end users should be performed to truly evaluate the effectiveness of continued development of such visualizations.

  7. Base Realignment and Closure (BRAC) Cleanup Plan for Fort Devens, Fort Devens, Massachusetts

    DTIC Science & Technology

    1995-08-01

    Fort Devens . The table will be updated as additional remedial actions are completed . Following Table D-1 are the executive summaries of...provides for the identification of appropriate, cost effective and integrated remedial actions , installation-wide. The BCT is working with the Fort Devens ...and 3-5, respectively. Three compliance-related activities at Fort Devens have been completed as early actions in order to reduce or eliminate

  8. Propulsion Health Management System Development for Affordable and Reliable Operation of Space Exploration Systems

    NASA Technical Reports Server (NTRS)

    Melcher, Kevin J.; Maul, William A.; Garg, Sanjay

    2007-01-01

    The constraints of future Exploration Missions will require unique integrated system health management capabilities throughout the mission. An ambitious launch schedule, human-rating requirements, long quiescent periods, limited human access for repair or replacement, and long communication delays, all require an integrated approach to health management that can span distinct, yet interdependent vehicle subsystems, anticipate failure states, provide autonomous remediation and support the Exploration Mission from beginning to end. Propulsion is a critical part of any space exploration mission, and monitoring the health of the propulsion system is an integral part of assuring mission safety and success. Health management is a somewhat ubiquitous technology that encompasses a large spectrum of physical components and logical processes. For this reason, it is essential to develop a systematic plan for propulsion health management system development. This paper provides a high-level perspective of propulsion health management systems, and describes a logical approach for the future planning and early development that are crucial to planned space exploration programs. It also presents an overall approach, or roadmap, for propulsion health management system development and a discussion of the associated roadblocks and challenges.

  9. Portable exhausters POR-004 SKID B, POR-005 SKID C, POR-006 SKID D storage plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Nelson, O.D.

    1997-09-04

    This document provides a storage plan for portable exhausters POR-004 SKID B, POR-005 SKID C, AND POR-006 SKID D. The exhausters will be stored until they are needed by the TWRS (Tank Waste Remediation Systems) Saltwell Pumping Program. The storage plan provides criteria for portable exhauster storage, periodic inspections during storage, and retrieval from storage.

  10. A cost effective bioremediation strategy using low technology resources for reclamation of dry land hydrocarbon contamination: A case study

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Robb, A.J. III; Hoggatt, P.R.

    Hydrocarbon containing soil was bioremediated at a combination wastewater and slop oil skim evaporation pond utilizing cost effective low technology resources. Fluids and sludge from the football field-sized pond were extraction procedure toxicity and purgeable organics tested, and total petroleum hydrocarbon (TPH) concentrations determined. An impact risk analysis was performed, and a corrective action plan developed and implemented. The three year project was closely coordinated with the Kansas Corporation Commission (KCC) and the Kansas Department of Health and Environment (KDHE) who established the closure level. The impacted soils at the pond were completely excavated and closure was immediately granted bymore » KDHE for the excavated area. The 24,000 cubic yards of excavated soil were then surface spread on adjacent Mobil property. A nutrient and microbial base was applied to bioaugment the soil. The preapplication land surface and the subsequently land farmed soil was periodically disced and chiseled. A job safety plan including industrial hygiene measures to eliminate workforce exposure was developed and implemented. The final remediation cost analysis amounts to $1.48 per cubic yard compared to the $30 to $150 per cubic yard industry o estimates for similar projects. Several factors were critical in ailing costs to remain so low: (1) assessment and implementation by local in-house staff, (2) conservative remedial action plan and sampling strategy; (3) local contractors; (4) locally available soil amendment; and (5) effective regulatory coordination. The methods described can be used to cost effectively characterize and bioremediate other sites where hydrocarbon-impacted soils exist in similar dry-land environments.« less

  11. 24 CFR 8.52 - Remedial and affirmative action.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 24 Housing and Urban Development 1 2011-04-01 2011-04-01 false Remedial and affirmative action. 8... THE DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT Enforcement § 8.52 Remedial and affirmative action. (a) Remedial action. (1) If the responsible civil rights official finds that a recipient has discriminated...

  12. 24 CFR 8.52 - Remedial and affirmative action.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 24 Housing and Urban Development 1 2010-04-01 2010-04-01 false Remedial and affirmative action. 8... THE DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT Enforcement § 8.52 Remedial and affirmative action. (a) Remedial action. (1) If the responsible civil rights official finds that a recipient has discriminated...

  13. Comprehensive Nuclear-Test-Ban Treaty: Background and Current Developments

    DTIC Science & Technology

    2010-12-07

    there are no plans to do so.’”4 Critics expressed concern about the implications of these policies for testing and new weapons. Physicians for...design and build new nuclear weapons, and abandon a ten-year-old moratorium on nuclear weapons testing.”5 Another critic felt that increased funding for...guarantees regarding the voluntary moratorium. We may find at some future time that we cannot diagnose or remedy a problem in a warhead critical the U.S

  14. Comprehensive Nuclear-Test-Ban Treaty: Background and Current Developments

    DTIC Science & Technology

    2009-01-28

    safe. So he has not ruled out testing in the future, but there are no plans to do so.’”5 Critics expressed concern about the implications of these...nuclear weapons testing.”6 Another critic felt that increased funding for test readiness would in effect give prior approval for testing. In July 2002 a...moratorium. We may find at some future time that we cannot diagnose or remedy a problem in a warhead critical the U.S. nuclear deterrent without

  15. Summary Report of Laboratory Testing to Establish the Effectiveness of Proposed Treatment Methods for Unremediated and Remediated Nitrate Salt Waste Streams

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Anast, Kurt Roy; Funk, David John

    The inadvertent creation of transuranic waste carrying hazardous waste codes D001 and D002 requires the treatment of the material to eliminate the hazardous characteristics and allow its eventual shipment and disposal at the Waste Isolation Pilot Plant (WIPP). This report documents the effectiveness of two treatment methods proposed to stabilize both the unremediated and remediated nitrate salt waste streams (UNS and RNS, respectively). The two technologies include the addition of zeolite (with and without the addition of water as a processing aid) and cementation. Surrogates were developed to evaluate both the solid and liquid fractions expected from parent waste containers,more » and both the solid and liquid fractions were tested. Both technologies are shown to be effective at eliminating the characteristic of ignitability (D001), and the addition of zeolite was determined to be effective at eliminating corrosivity (D002), with the preferred option1 of zeolite addition currently planned for implementation at the Waste Characterization, Reduction, and Repackaging Facility. During the course of this work, we established the need to evaluate and demonstrate the effectiveness of the proposed remedy for debris material, if required. The evaluation determined that Wypalls absorbed with saturated nitrate salt solutions exhibit the ignitability characteristic (all other expected debris is not classified as ignitable). Follow-on studies will be developed to demonstrate the effectiveness of stabilization for ignitable Wypall debris. Finally, liquid surrogates containing saturated nitrate salts did not exhibit the characteristic of ignitability in their pure form (those neutralized with Kolorsafe and mixed with sWheat did exhibit D001). As a result, additional nitrate salt solutions (those exhibiting the oxidizer characteristic) will be tested to demonstrate the effectiveness of the remedy.« less

  16. The Remediation of Abandoned Iron Ore Mine Subsidence in Rockaway Township, New Jersey

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Gartenberg, Gary; Poff, Gregory

    2010-06-30

    This report represents the twenty-seventh and Final Technical Progress Report issued in connection with the subsidence remediation projects undertaken by Rockaway Township in Morris County, New Jersey. This report provides a summary of the major project work accomplished during this last reporting period ending June 30, 2010 and a summary of the work accomplished since the agreement inception in 1997. This report is issued as part of the project reporting provisions set forth in the Cooperator's Agreement between the United States Government - Department of Energy, and Rockaway Township. The purpose of the Cooperator's Agreement is for the Department ofmore » Energy to provide technical and financial assistance in a coordinated effort with Rockaway Township to develop and implement a multi-phased plan to remediate ground stability problems associated with abandoned mining activity. Primarily during the 1800's, extensive iron ore mining and prospecting was undertaken in Rockaway Township, part of the Dover District Mining region in Morris County. The abandoned mining activity has resulted in public safety hazards associated with ground collapse and surface subsidence features evolving in both developed and undeveloped areas within Rockaway Township. At the Green Pond Mine site at the Township's Jacobs Road Compost Storage Facility, surface monitoring continued after completion of construction in September 2003. Surface monitoring was conducted periodically at the Mt. Hope Road subsidence work area and adjacent areas after the January 2000 construction effort. In March 2007, a seventh collapse occurred over a portion of the White Meadow Mine in a public roadway at the intersection of Iowa and Erie Avenues in Rockaway Township. After test drilling, this portion of the mine was remediated by drilling and grouting the stopes.« less

  17. Nuclear facility decommissioning and site remedial actions: A selected bibliography, volume 9

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Owen, P.T.; Knox, N.P.; Michelson, D.C.

    1988-09-01

    The 604 abstracted references on nuclear facility decommissioning, uranium mill tailings management, and site remedial actions constitute the ninth in a series of reports prepared annually for the US Department of Energy's Remedial Action Programs. Foreign and domestic literature of all types--technical reports, progress reports, journal articles, symposia proceedings, theses, books, patents, legislation, and research project descriptions--has been included. The bibliography contains scientific, technical, economic, regulatory, and legal information pertinent to the US Department of Energy's remedial action programs. Major sections are (1) Surplus Facilities Management Program, (2) Nuclear Facilities Decommissioning, (3) Formerly Utilized Sites Remedial Action Program, (4) Facilitiesmore » Contaminated with Naturally Occurring Radionuclides, (5) Uranium Mill Tailings Remedial Action Program, (6) Uranium Mill Tailings Management, (7) Technical Measurements Center, and (8) General Remedial Action Program Studies. Subsections for sections 1, 2, 5, and 6 include: Design, Planning, and Regulations; Environmental Studies and Site Surveys; Health, Safety, and Biomedical Studies; Decontamination Studies; Dismantlement and Demolition; Site Stabilization and Reclamation; Waste Disposal; Remedial Action Experience; and General Studies. Within these categories, references are arranged alphabetically by first author. Those references having no individual author are listed by corporate affiliation or by publication description. Indexes are provided for author, corporate affiliation, title word, publication description, geographic location, and keywords. This report is a product of the Remedial Action Program Information Center (RAPIC), which selects and analyzes information on remedial actions and relevant radioactive waste management technologies. RAPIC staff and resources are available to meet a variety of information needs. Contact the center at (615) 576-0568 or FTS 626-0568.« less

  18. Deep Vadose Zone Treatability Test for the Hanford Central Plateau: Interim Post-Desiccation Monitoring Results, Fiscal Year 2014

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Truex, Michael J.; Strickland, Christopher E.; Johnson, Christian D.

    Over decades of operation, the U.S. Department of Energy (DOE) and its predecessors have released nearly 2 trillion L (450 billion gal.) of liquid into the vadose zone at the Hanford Site. Much of this discharge of liquid waste into the vadose zone occurred in the Central Plateau, a 200 km 2 (75 mi 2) area that includes approximately 800 waste sites. Some of the inorganic and radionuclide contaminants in the deep vadose zone at the Hanford Site are at depths below the limit of direct exposure pathways, but may need to be remediated to protect groundwater. The Tri-Party Agenciesmore » (DOE, U.S. Environmental Protection Agency, and Washington State Department of Ecology) established Milestone M 015 50, which directed DOE to submit a treatability test plan for remediation of technetium-99 (Tc-99) and uranium in the deep vadose zone. These contaminants are mobile in the subsurface environment and have been detected at high concentrations deep in the vadose zone, and at some locations have reached groundwater. Testing technologies for remediating Tc-99 and uranium will also provide information relevant for remediating other contaminants in the vadose zone. A field test of desiccation is being conducted as an element of the DOE test plan published in March 2008 to meet Milestone M 015 50. The active desiccation portion of the test has been completed. Monitoring data have been collected at the field test site during the post-desiccation period and are reported herein. This is an interim data summary report that includes about 3 years of post-desiccation monitoring data. The DOE field test plan proscribes a total of 5 years of post-desiccation monitoring.« less

  19. Nuclear facility decommissioning and site remedial actions: A selected bibliography: Volume 8

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Owen, P.T.; Michelson, D.C.; Knox, N.P.

    1987-09-01

    The 553 abstracted references on nuclear facility decommissioning, uranium mill tailings management, and site remedial actions constitute the eighth in a series of reports. Foreign and domestic literature of all types - technical reports, progress reports, journal articles, symposia proceedings, theses, books, patents, legislation, and research project descriptions - has been included. The bibliography contains scientific, technical, economic, regulatory, and legal information pertinent to the US Department of energy's remedial action program. Major chapters are Surplus Facilities Management Program, Nuclear Facilities Decommissioning, Formerly Utilized Sites Remedial Action Program, Facilities Contaminated with Naturally Occurring Radionuclides, Uranium Mill Tailings Remedial Action Program,more » Uranium Mill Tailings Management, Technical Measurements Center, and General Remedial Action Program Studies. Chapter sections for chapters 1, 2, 5, and 6 include Design, Planning, and Regulations; Environmental Studies and Site Surveys; Health, Safety, and Biomedical Studies; Decontamination Studies; Dismantlement and Demolition; Site Stabilization and Reclamation; Waste Disposal; Remedial Action Experience; and General Studies. Within these categories, references are arranged alphabetically by first author. Those references having no individual author are listed by corporate affiliation or by publication description. Indexes are provided for author, corporate affiliation, title word, publication description, geographic location, and keywords. The appendix contains a list of frequently used acronyms and abbreviations.« less

  20. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Chambers, Doug; Wiatzka, Gerd; Brown, Steve

    This paper provides the life story of Canada's original radium/uranium mine. In addition to the history of operations, it discusses the unique and successful approach used to identify the key issues and concerns associated with the former radium, uranium and silver mining property and the activities undertaken to define the remedial actions and subsequent remedial plan. The Port Radium Mine site, situated approximately 275 km north of Yellowknife on the east shore of Great Bear Lake, Northwest Territories, was discovered in 1930 and underground mining began in 1932. The mine operated almost continuously from 1932 to 1982, initially for recoverymore » of radium, then uranium and finally, for recovery of silver. Tailings production totaled an estimated 900,000 tons and 800,000 tons from uranium and silver processing operations respectively. In the early days of mining, Port Radium miners were exposed to radon and associated decay product levels (in Working Level Months of exposure - WLM) hundreds of times greater than modern standards. The experience of the Port Radium miners provides important contribution to understanding the risks from radon. While the uranium mine was originally decommissioned in the early 1960's, to the standards of the day, the community of Deline (formerly Fort Franklin) had concerns about residual contamination at the mine site and the potential effects arising from use of traditional lands. The Deline people were also concerned about the possible risks to Deline Dene arising from their work as ore carriers. In the late 1990's, the community of Deline brought these concerns to national attention and consequently, the Government of Canada and the community of Deline agreed to move forward in a collaborative manner to address these concerns. The approach agreed to was to establish the Canada-Deline Uranium Table (CDUT) to provide a joint process by which the people of Deline could have their concerns expressed and addressed. A great deal of work was done through the CDUT, including efforts to assess site environment and safety issues in the context of modern reclamation standards. In addition to the environmental and remediation studies, an assessment of historic exposures of Deline ore carriers to radiation and a follow-up epidemiological feasibility study were performed. SENES Consultants Limited (SENES) carried out the dose reconstruction for the Port Radium miners in the 1990's, was the environmental consultant to the CDUT from 2000 to 2005, developed the Remedial Action Plan (RAP), engineering plans and specifications for decommissioning the Port Radium mine and vicinity sites in 2005/6, supervised the remedial works in 2007 and carried out the long term post closure monitoring from 2008 to 2012. Our firsthand experience from working cooperatively with the CDUT provides insights into effective decommissioning of historic contaminated sites. (authors)« less

  1. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bush, Richard; Lemke, Peter

    The groundwater compliance strategy for the Tuba City, Arizona, Disposal Site is defined in the 1999 Phase I Ground Water Compliance Action Plan for the Tuba City, Arizona, UMTRA Site. Samples are collected and analyzed on a semiannual basis to evaluate the performance of the Phase I remediation system. Sampling and analyses were conducted as specified in Sampling and Analysis Plan for U.S. Department of Energy Office of Legacy Management Sites (LMS/PRO/S04351, continually updated). U.S. Environmental Protection Agency (EPA) groundwater standards were exceeded in samples collected from monitoring wells as listed in Table 1. The data from this sampling eventmore » are generally consistent with previously obtained values and are acceptable for general use as qualified. Data anomalies are not significant with respect to the known nature and extent of contamination and progress of remedial action at the site. The data from this sampling event will be incorporated into the annual performance evaluation report that will present a comprehensive hydrologic summary and evaluation of groundwater remedial action performance at the Tuba City site through March 2016.« less

  2. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bush, Richard; Lemke, Peter

    The groundwater compliance strategy for the Tuba City, Arizona, Disposal Site is defined in the 1999 Phase I Ground Water Compliance Action Plan for the Tuba City, Arizona, UMTRA Site. Samples are collected and analyzed on a semiannual basis to evaluate the performance of the Phase I remediation system. Sampling and analyses were conducted as specified in Sampling and Analysis Plan for U.S. Department of Energy Office of Legacy Management Sites (LMS/PRO/S04351, continually updated). U.S. Environmental Protection Agency (EPA) groundwater standards were exceeded in samples collected from monitoring wells and extraction wells as listed in Table 1. The data frommore » this sampling event are generally consistent with previously obtained values and are acceptable for general use as qualified. Data anomalies are not significant with respect to the known nature and extent of contamination and progress of remedial action at the site. The data from this sampling event will be incorporated into the annual performance evaluation report that will present a comprehensive hydrologic summary and evaluation of groundwater remedial action performance at the Tuba City site through March 2016.« less

  3. The Development and Evaluation of Listening and Speaking Diagnosis and Remedial Teaching System

    ERIC Educational Resources Information Center

    Hsiao, Hsien-Sheng; Chang, Cheng-Sian; Lin, Chiou-Yan; Chen, Berlin; Wu, Chia-Hou; Lin, Chien-Yu

    2016-01-01

    In this study, a system was developed to offer adaptive remedial instruction materials to learners of Chinese as a foreign language (CFL). The Chinese Listening and Speaking Diagnosis and Remedial Instruction (CLSDRI) system integrated computerized diagnostic tests and remedial instruction materials to diagnose errors made in listening…

  4. A Multidisciplinary Paradigm and Approach to Protecting Human Health and the Environment, Society, and Stakeholders at Nuclear Facilities - 12244

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Burger, Joanna; Environmental and Occupational Health Sciences Institute, Piscataway, NJ; Gochfeld, Michael

    2012-07-01

    As the Department of Energy (DOE) continues to remediate its lands, and to consider moving toward long-term stewardship and the development of energy parks on its industrial, remediated land, it is essential to adequately characterize the environment around such facilities to protect society, human health, and the environment. While DOE sites re considering several different land-use scenarios, all of them require adequate protection of the environment. Even if DOE lands are developed for energy parks that are mainly for industrializes sections of DOE lands that will not be remediated to residential standards, there is still the need to consider themore » protection of human health and the environment. We present an approach to characterization and establishment of teams that will gather the information, and integrate that information for a full range of stakeholders from technical personnel, to public policy makers, and that public. Such information is needed to establish baselines, site new energy facilities in energy parks, protect existing nuclear facilities and nuclear wastes, improve the basis for emergency planning, devise suitable monitoring schemes to ensure continued protection, provide data to track local and regional response changes, and for mitigation, remediation and decommissioning planning. We suggest that there are five categories of information or data needs, including 1) geophysical, sources, fate and transport, 2) biological systems, 3) human health, 4) stakeholder and environmental justice, and 5) societal, economic, and political. These informational needs are more expansive than the traditional site characterization, but encompass a suite of physical, biological, and societal needs to protect all aspects of human health and the environment, not just physical health. We suggest a Site Committee be established that oversees technical teams for each of the major informational categories, with appropriate representation among teams and with a broad involvement of a range of governmental personnel, natural and social scientists, Native Americans, environmental justice communities, and other stakeholders. Such informational teams (and Oversight Committee) would report to a DOE-designated authority or Citizen's Advisory Board. Although designed for nuclear facilities and energy parks on DOE lands, the templates and information teams can be adapted for other hazardous facilities, such as a mercury storage facility at Oak Ridge. (authors)« less

  5. SUPERFUND TREATABILITY CLEARINGHOUSE: WORK PLAN FOR BIODEGRADATION OF POLY-CHLORINATED BIPHENYLS (PCBS) AT A SUPERFUND SITE

    EPA Science Inventory

    This document is composed of a work plan and additional technical information which demonstrates the qualifications of Detox Industries, Inc. to conduct remediation of a PCB contaminated sludge at General Motors (GM) plant in New York. Provided are the results of a field demons...

  6. ICD Complex Operations and Maintenance Plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Gibson, P. L.

    2007-06-25

    This Operations and Maintenance (O&M) Plan describes how the Idaho National Laboratory (INL) conducts operations, winterization, and startup of the Idaho CERCLA Disposal Facility (ICDF) Complex. The ICDF Complex is the centralized INL facility responsible for the receipt, storage, treatment (as necessary), and disposal of INL Comprehensive Environmental Response, Compensation and Liability Act (CERCLA) remediation waste.

  7. Plan for Minority and Women Business Enterprise Contract Participation and Authorization To Amend Plan.

    ERIC Educational Resources Information Center

    Chicago Board of Education, IL.

    This document outlines procedures for following the Chicago Board of Education procurement policy of providing fair and representative employment and business opportunities for minorities and women to remediate the adverse affects of historically discriminatory and exclusionary practices. These procedures are to be used in awarding contracts for…

  8. Is there a way for clinical teachers to assist struggling learners? A synthetic review of the literature

    PubMed Central

    Boileau, Elisabeth; St-Onge, Christina; Audétat, Marie-Claude

    2017-01-01

    Struggling medical trainees pose a challenge to clinical teachers, since these learners warrant closer supervision that is time-consuming and competes with time spent on patient care. Clinical teachers’ perception that they are ill equipped to address learners’ difficulties efficiently may lead to delays or even lack of remediation for these learners. Because of the paucity of evidence to guide best practices in remediation, the best approach to guide clinical teachers in the field remains to be established. We aimed to present a synthetic review of the empirical evidence and theory that may guide clinical teachers in their daily task of supervising struggling learners, reviewing current knowledge on the challenges and solutions that have been identified and explored. A computerized literature search was performed using Medline, Embase, Education Resources Information Center, and Education Source, after which final articles were selected based on relevance. The literature reviewed provided best evidence for clinical teachers to address learners’ difficulties, which is presented in the order of the four steps inherent to the clinical approach: 1) detecting a problem based on a subjective impression, 2) gathering and documenting objective data, 3) assessing data to make a diagnosis, and 4) planning remediation. A synthesized classification of pedagogical diagnoses is also presented. This review provides an outline of practical recommendations regarding the supervision and management of struggling learners up to the remediation phase. Our findings suggest that future research and faculty development endeavors should aim to operationalize remediation strategies further in response to specific diagnoses, and to make these processes more accessible to clinical teachers in the field. PMID:28176916

  9. Centrifugal shot blasting. Innovative technology summary report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1999-07-01

    At the US Department of Energy (DOE) Fernald Environmental Management Project (FEMP), the Facilities Closure and Demolition Projects Integrated Remedial Design/Remedial Action (RD/RA) work plan calls for the removal of one inch (1 in) depth of concrete surface in areas where contamination with technetium-99 has been identified. This report describes a comparative demonstration between two concrete removal technologies: an innovative system using Centrifugal Shot Blasting (CSB) and a modified baseline technology called a rotary drum planer.

  10. Superfund Record of Decision (EPA Region 6): Texarkana Wood Preserving Company, Operable Unit 2, Texarkana, TX, September 1993

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    This decision document presents the selected remedial action for Operable Unit Two for the Texarkana Wood Preserving Company (TWPC) Superfund Site (Site) in Texarkana, Texas. This operable unit is the second of two operable units planned for the Site. Operable Unit Two involves remediation of the deeper ground water contaminated above the action levels in a limited area of the Silty Sand Zone around Monitoring Well-16.

  11. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kautsky, Mark; Miller, David

    This annual report evaluates the performance of the groundwater remediation system at the Shiprock, New Mexico, Disposal Site (Shiprock site) for the period April 2015 through March 2016. The Shiprock site, a former uranium-ore processing facility remediated under the Uranium Mill Tailings Radiation Control Act, is managed by the U.S. Department of Energy (DOE) Office of Legacy Management. This annual report is based on an analysis of groundwater quality and groundwater level data obtained from site monitoring wells and the groundwater flow rates associated with the extraction wells, drains, and seeps. Background The Shiprock mill operated from 1954 to 1968more » on property leased from the Navajo Nation. Remediation of surface contamination, including stabilization of mill tailings in an engineered disposal cell, was completed in 1986. During mill operation, nitrate, sulfate, uranium, and other milling-related constituents leached into underlying sediments and contaminated groundwater in the area of the mill site. In March 2003, DOE initiated active remediation of groundwater at the site using extraction wells and interceptor drains. At that time, DOE developed a baseline performance report that established specific performance standards for the Shiprock site groundwater remediation system. The Shiprock site is divided into two distinct areas: the floodplain and the terrace. The floodplain remediation system consists of two groundwater extraction wells, a seep collection drain, and two collection trenches (Trench 1 and Trench 2). The terrace remediation system consists of nine groundwater extraction wells, two collection drains (Bob Lee Wash and Many Devils Wash), and a terrace drainage channel diversion structure. All extracted groundwater is pumped into a lined evaporation pond on the terrace. Compliance Strategy and Remediation Goals As documented in the Groundwater Compliance Action Plan, the U.S. Nuclear Regulatory Commission–approved compliance strategy for the floodplain is natural flushing supplemented by active remediation. The contaminants of concern (COCs) at the site are ammonia (total as nitrogen), manganese, nitrate (nitrate + nitrite as nitrogen), selenium, strontium, sulfate, and uranium. The compliance standards for nitrate, selenium, and uranium are listed in Title 40 Code of Federal Regulations Part 192. Regulatory standards are not available for ammonia, manganese, and sulfate; remediation goals for these constituents are either risk-based alternate cleanup standards or background levels. These standards and background levels apply only to the compliance strategy for the floodplain. The compliance strategy for the terrace is to eliminate exposure pathways at the washes and seeps and to apply supplemental standards in the western section.« less

  12. Superfund Record of Decision (EPA Region 3): Buckingham County Landfill Superfund Site, VA, September 1994

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1994-10-01

    The Record of Decision (ROD) presents the final remedial action selected for the Buckingham County Landfill Superfund Site (Site), located near the town of Sprouse's Corner in Buckingham County, Virginia. The remedial action was chosen in accordance with the requirements of the Comprehensive Environmental Response Compensation and Liability Act of 1980 (CERCLA), 42 U.S.C. Section 9601 et. seg., as amended by the Superfund Amendments and Reauthorization Act of 1986 (SARA), and the National Oil and Hazardous Substances Pollution Contingency Plan (NCP), 40 C.F.R. Part 300. The decision document explains the factual and legal basis for selecting the remedial action. Themore » selected remedy includes the two following options, both of which are fully protective of human health and the environment: Monitor the ground water and cap the hazardous waste disposal area; and Implement the source control measures.« less

  13. Targeted Health Assessment for Wastes Contained at the Niagara Falls Storage Site to Guide Planning for Remedial Action Alternatives - 13428

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Busse, John; Keil, Karen; Staten, Jane

    2013-07-01

    The U.S. Army Corps of Engineers (USACE) is evaluating potential remedial alternatives at the 191-acre Niagara Falls Storage Site (NFSS) in Lewiston, New York, under the Formerly Utilized Sites Remedial Action Program (FUSRAP). The Manhattan Engineer District (MED) and Atomic Energy Commission (AEC) brought radioactive wastes to the site during the 1940's and 1950's, and the U.S. Department of Energy (US DOE) consolidated these wastes into a 10-acre interim waste containment structure (IWCS) in the southwest portion of the site during the 1980's. The USACE is evaluating remedial alternatives for radioactive waste contained within the IWCS at the NFSS undermore » the Feasibility Study phase of the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) process. A preliminary evaluation of the IWCS has been conducted to assess potential airborne releases associated with uncovered wastes, particularly during waste excavation, as well as direct exposures to uncovered wastes. Key technical issues for this assessment include: (1) limitations in waste characterization data; (2) representative receptors and exposure routes; (3) estimates of contaminant emissions at an early stage of the evaluation process; (4) consideration of candidate meteorological data and air dispersion modeling approaches; and (5) estimates of health effects from potential exposures to both radionuclides and chemicals that account for recent updates of exposure and toxicity factors. Results of this preliminary health risk assessment indicate if the wastes were uncovered and someone stayed at the IWCS for a number of days to weeks, substantial doses and serious health effects could be incurred. Current controls prevent such exposures, and the controls that would be applied to protect onsite workers during remedial action at the IWCS would also effectively protect the public nearby. This evaluation provides framing context for the upcoming development and detailed evaluation of remedial alternatives for the IWCS. (authors)« less

  14. Northeast Waste Management Enterprise (NEWME) 1996 annual/final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Goland, A.; Kaplan, E.; Palmedo, P. Wortman, J.

    1997-10-01

    The Northeast Waste Management Enterprise was created in response to Dr. Clyde Frank`s vision of a new partnership between research, industrial, and financial sectors, with the goal of speeding development and use (particularly at U.S. Department of Energy [DOE] facilities) of environmental remediation technologies. It was anticipated that this partnership would also strengthen the international competitiveness of the U.S. environmental industry. Brookhaven National Laboratory`s (BNL) response to Dr. Frank was a proposal to create the Northeast Waste Management Alliance, later renamed the Northeast Waste Management Enterprise (NEWME). Recognizing the need to supplement its own technical expertise with acumen in business,more » financial management, and venture capital development, BNL joined forces with the Long Island Research Institute (LIRI). Since its inception at the end of FY 1993, NEWME has achieved several significant accomplishments in pursuing its original business and strategic plans. However, its successes have been constrained by a fundamental mismatch between the time scales required for technology commercialization, and the immediate need for available environmental technologies of those involved with ongoing environmental remediations at DOE facilities.« less

  15. Development Of An In Situ Passive Sampler For The Detection And Remediation of Explosive Compounds

    DTIC Science & Technology

    2016-06-07

    FINAL REPORT Development of an In Situ Passive Sampler for the Detection and Remediation of Explosive Compounds SERDP Project ER-2539 MAY 2016...DATES COVERED (From - To) 4/24/15 – 12/1/2016 4. TITLE AND SUBTITLE Development of an In Situ Passive Sampler for the Detection and Remediation of...SUBJECT TERMS Passive samplers, Ethylene vinyl acetate, EVA sampler, Munitions, Monitoring, Remediation , Marine, Sediments 16. SECURITY

  16. Milan Army Ammunition Plant focused feasibility study for the northern industrial area soil. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Locandro, R.R.; Okusu, N.M.; Case, J.

    1995-04-01

    ICF Kaiser Engineers (ICF) and Environmental Resources Management (ERM) have been contracted by the US Army Environmental Center (USAEC) to perform a Focused Feasibility Study (FS) for contaminated soil within the northern industrial areas of Milan Army Ammunition Plant (MAAP), Tennessee. The purpose of the Focused FS is to develop and evaluate remedial alternatives such that an appropriate remedy can be selected for the site. The MAAP Remedial Investigation (RI) performed in 1989--1991 confirmed that the O-Line Ponds area, facility drainage ditches that received industrial wastewater, and manufacturing and disposal areas have been sources of groundwater contamination. One finding ofmore » the RI Report was that sufficient information was available concerning the O-Line Ponds area to proceed with a Focused FS. The O-Line Ponds area was further divided into two operable units (OUs): OU1 is the groundwater immediately downgradient of the O-Line Ponds area, and OU2 is the soil, surface water, and sediment at the O-Line Ponds area. A Proposed Plan and Record of Decision (ROD) for OU1 were finalized in 1992, which called for groundwater extraction, treatment, and reinjection of the treated water upgradient of the O-Line Ponds. The design of this system was completed in 1993, and construction of the system is currently underway. For OU2, the Proposed Plan and ROD (finalized in 1993) called for the extension of the existing multi-layered cap to cover the contaminated soil around the perimeter of the existing cap. The design of the cap extension was completed in 1994, and construction will begin in late 1994.« less

  17. State Environmental Policy Act (SEPA) environmental checklist forms for 304 Concretion Facility Closure Plan. Revision 2

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    The 300 Area of the Hanford Site contains reactor fuel manufacturing facilities and several research and development laboratories. Recyclable scrap uranium with zircaloy-2 and copper silicon alloy, uranium-titanium alloy, beryllium/zircaloy-2 alloy, and zircaloy-2 chips and fines were secured in concrete billets (7.5-gallon containers) in the 304 Facility, located in the 300 Area. The beryllium/zircaloy-2 alloy and zircaloy-2 chips and fines are designated as mixed waste with the characteristic of ignitability. The concretion process reduced the ignitability of the fines and chips for safe storage and shipment. This process has been discontinued and the 304 Facility is now undergoing closure asmore » defined in the Resource Conservation and Recovery Act (RCRA) of 1976 and the Washington Administrative Code (WAC) Dangerous Waste Regulations, WAC 173-303-040. This closure plan presents a description of the 304 Facility, the history of materials and waste managed, and the procedures that will be followed to close the 304 Facility. The 304 Facility is located within the 300-FF-3 (source) and 300-FF-5 (groundwater) operable units, as designated in the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement) (Ecology et al. 1992). Contamination in the operable units 300-FF-3 and 300-FF-5 is scheduled to be addressed through the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) of 1980 remedial action process. Therefore, all soil remedial action at the 304 Facility will be conducted as part of the CERCLA remedial action of operable units 300-FF-3 and 300-FF-5.« less

  18. Management assessment of tank waste remediation system contractor readiness to proceed with phase 1B privatization

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Honeyman, J.O.

    1998-01-09

    This Management Assessment of Tank Waste Remediation System (TWRS) Contractor Readiness to Proceed With Phase 1B Privatization documents the processes used to determine readiness to proceed with tank waste treatment technologies from private industry, now known as TWRS privatization. An overall systems approach was applied to develop action plans to support the retrieval and disposal mission of the TWRS Project. The systems and infrastructure required to support the mission are known. Required systems are either in place or plans have been developed to ensure they exist when needed. Since October 1996 a robust system engineering approach to establishing integrated Technicalmore » Baselines, work breakdown structures, tank farms organizational structure and configurations, work scope, and costs has become part of the culture within the TWRS Project. An analysis of the programmatic, management, and technical activities necessary to declare readiness to proceed with execution of the mission demonstrates that the system, personnel, and hardware will be on-line and ready to support the private contractors. The systems approach included defining the retrieval and disposal mission requirements and evaluating the readiness of the Project Hanford Management Contract (PHMC) team to support initiation of waste processing by the private contractors in June 2002 and to receive immobilized waste shortly thereafter. The Phase 1 feed delivery requirements from the private contractor Requests for Proposal were reviewed. Transfer piping routes were mapped, existing systems were evaluated, and upgrade requirements were defined.« less

  19. Effectiveness of a self-regulated remedial program for handwriting difficulties.

    PubMed

    Van Waelvelde, Hilde; De Roubaix, Amy; Steppe, Lien; Troubleyn, Evy; De Mey, Barbara; Dewitte, Griet; Debrabant, Julie; Van de Velde, Dominique

    2017-09-01

    Handwriting difficulties may have pervasive effects on a child's school performance. I Can! is a remedial handwriting program with a focus on self-regulated learning and applying motor learning principles combined with a behavioural approach. It is developed for typically developing children with handwriting problems. The study aim was to evaluate the program's effectiveness. Thirty-one children aged 7-8 year participated in a cross-over study. Handwriting quality and speed were repeatedly assessed by means of the Systematic Screening of Handwriting Difficulties test. Difficulties addressed were fluency in letter formation, fluency in letter connections, letter height, regularity of letter height, space between words, and line path. Mixed model analysis revealed improved quality of writing and speed for all children but significantly more improvement in handwriting quality for the children participating in the program. Although writing speed improved over time, no additional effects of the program occurred. 'I Can!' is found to be an effective instructive program to ameliorate handwriting quality in typically developing children with handwriting difficulties. The program's success was by a therapy burst of only 7 weeks focusing on the child's self-regulated learning capacities, within an individualized education plan according to their needs and goals.

  20. Human health risk assessment in restoring safe and productive use of abandoned contaminated sites.

    PubMed

    Wcisło, Eleonora; Bronder, Joachim; Bubak, Anicenta; Rodríguez-Valdés, Eduardo; Gallego, José Luis R

    2016-09-01

    In Europe soil contamination has been recognized as a serious problem. The needs to remediate contaminated sites are not questionable, although the remediation actions are often hindered by their very high financial costs. On the other hand, the abandoned contaminated sites may have the potential for redevelopment and creating conditions appropriate for their productive reuse bringing social, economic and environmental benefits. The main concern associated with the contaminated sites is their potential adverse health impact. Therefore, in the process of contaminated site redevelopment the risk assessment and the subsequent risk management decisions will play a crucial role. The main objective of this study was to illustrate the role of the human health risk assessment (HRA) in supporting site remediation and reuse decisions. To exemplify the significance of the HRA process in this field the Nitrastur site, located in Asturias, Spain was used. Risks resulting from soil contamination with arsenic (As), cadmium (Cd), chromium (Cr), copper (Cu), nickel (Ni), mercury (Hg), zinc (Zn) and lead (Pb) were assessed under three potential future land use patterns: industrial, residential and recreational. The results of the study indicated that soil at the Nitrastur site might pose non-cancer and cancer risks to potential future receptors - industrial workers, residents and recreational users. Arsenic and lead are the main substances responsible for the health risk and the primary drivers of remedial decisions at the site. The highest total cancer risks were observed under the residential scenario, followed in descending order by the recreational and industrial ones. The remedial maps illustrate in which areas remediation activities are required, depending on a given land use pattern. The obtained results may be used to develop, analyse, compare and select the remedial options within the intended land use pattern. They may also be used to support the decisions concerning the reuse of the site or to create different redevelopment plans for different parts of the site. The study may help improve understanding and interaction between risk assessors and risk managers which are necessary to make proper, fully informed decisions enhancing public trust and credibility. Copyright © 2016 Elsevier Ltd. All rights reserved.

  1. A Review of Centrifugal Testing of Gasoline Contamination and Remediation

    PubMed Central

    Meegoda, Jay N.; Hu, Liming

    2011-01-01

    Leaking underground storage tanks (USTs) containing gasoline represent a significant public health hazard. Virtually undetectable to the UST owner, gasoline leaks can contaminate groundwater supplies. In order to develop remediation plans one must know the extent of gasoline contamination. Centrifugal simulations showed that in silty and sandy soils gasoline moved due to the physical process of advection and was retained as a pool of free products above the water table. However, in clayey soils there was a limited leak with lateral spreading and without pooling of free products above the water table. Amount leaked depends on both the type of soil underneath the USTs and the amount of corrosion. The soil vapor extraction (SVE) technology seems to be an effective method to remove contaminants from above the water table in contaminated sites. In-situ air sparging (IAS) is a groundwater remediation technology for contamination below the water table, which involves the injection of air under pressure into a well installed into the saturated zone. However, current state of the art is not adequate to develop a design guide for site implementation. New information is being currently generated by both centrifugal tests as well as theoretical models to develop a design guide for IAS. The petroleum contaminated soils excavated from leaking UST sites can be used for construction of highway pavements, specifically as sub-base material or blended and used as hot or cold mix asphalt concrete. Cost analysis shows that 5% petroleum contaminated soils is included in hot or cold mix asphalt concrete can save US$5.00 production cost per ton of asphalt produced. PMID:21909320

  2. A review of centrifugal testing of gasoline contamination and remediation.

    PubMed

    Meegoda, Jay N; Hu, Liming

    2011-08-01

    Leaking underground storage tanks (USTs) containing gasoline represent a significant public health hazard. Virtually undetectable to the UST owner, gasoline leaks can contaminate groundwater supplies. In order to develop remediation plans one must know the extent of gasoline contamination. Centrifugal simulations showed that in silty and sandy soils gasoline moved due to the physical process of advection and was retained as a pool of free products above the water table. However, in clayey soils there was a limited leak with lateral spreading and without pooling of free products above the water table. Amount leaked depends on both the type of soil underneath the USTs and the amount of corrosion. The soil vapor extraction (SVE) technology seems to be an effective method to remove contaminants from above the water table in contaminated sites. In-situ air sparging (IAS) is a groundwater remediation technology for contamination below the water table, which involves the injection of air under pressure into a well installed into the saturated zone. However, current state of the art is not adequate to develop a design guide for site implementation. New information is being currently generated by both centrifugal tests as well as theoretical models to develop a design guide for IAS. The petroleum contaminated soils excavated from leaking UST sites can be used for construction of highway pavements, specifically as sub-base material or blended and used as hot or cold mix asphalt concrete. Cost analysis shows that 5% petroleum contaminated soils is included in hot or cold mix asphalt concrete can save US$5.00 production cost per ton of asphalt produced.

  3. Test plan for the soils facility demonstration: A petroleum contaminated soil bioremediation facility

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lombard, K.H.

    1994-08-01

    The objectives of this test plan are to show the value added by using bioremediation as an effective and environmentally sound method to remediate petroleum contaminated soils (PCS) by: demonstrating bioremediation as a permanent method for remediating soils contaminated with petroleum products; establishing the best operating conditions for maximizing bioremediation and minimizing volatilization for SRS PCS during different seasons; determining the minimum set of analyses and sampling frequency to allow efficient and cost-effective operation; determining best use of existing site equipment and personnel to optimize facility operations and conserve SRS resources; and as an ancillary objective, demonstrating and optimizing newmore » and innovative analytical techniques that will lower cost, decrease time, and decrease secondary waste streams for required PCS assays.« less

  4. The norms, rules and motivational values driving sustainable remediation of contaminated environments: A study of implementation.

    PubMed

    Prior, Jason

    2016-02-15

    Efforts to achieve sustainability are transforming the norms, rules and values that affect the remediation of contaminated environments. This is altering the ways in which remediation impacts on the total environment. Despite this transformation, few studies have provided systematic insights into the diverse norms and rules that drive the implementation of sustainable remediation at contaminated sites, and no studies have investigated how values motivate compliance with these norms and rules. This study is a systematic analysis of the rules, norms and motivational values embedded in sustainable remediation processes at three sites across Australia, using in-depth interviews conducted with 18 participants between 2011 and 2014, through the application of Crawford and Ostrom's Institutional Grammar and Schwartz's value framework. These approaches offered methods for identifying the rules, norms, and motivational values that guided participants' actions within remediation processes at these sites. The findings identify a core set of 16 norms and 18 rules (sanctions) used by participants to implement sustainable remediation at the sites. These norms and rules: define the position of participants within the process, provide means for incorporating sustainability into established remediation practices, and define the scope of outcomes that constitute sustainable remediation. The findings revealed that motivational values focused on public interest and self-interest influenced participants' compliance with norms and rules. The findings also found strong interdependence between the norms and rules (sanctions) within the remediation processes and the normative principles operating within the broader domain of environmental management and planning. The paper concludes with a discussion of: the system of norms operating within sustainable remediation (which far exceed those associated with ESD); their link, through rules (sanctions) to contemporary styles of regulatory enforcement; and the underlying balance of public-interest values and self-interest values that drives participants' involvement in sustainable remediation. Copyright © 2015 Elsevier B.V. All rights reserved.

  5. Nuclear facility decommissioning and site remedial actions: a selected bibliography. Volume 5

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Owen, P.T.; Knox, N.P.; Chilton, B.D.

    1984-09-01

    This bibliography of 756 references with abstracts on the subject of nuclear facility decommissioning, uranium mill tailings management, and site remedial actions is the fifth in a series of annual reports prepared for the US Department of Energy, Division of Remedial Action Projects. Foreign as well as domestic literature of all types - technical reports, progress reports, journal articles, conference papers, symposium proceedings, theses, books, patents, legislation, and research project descriptions - has been included in this publication. The bibliography contains scientific (basic research as well as applied technology), economic, regulatory, and legal literature pertinent to the US Department ofmore » Energy's Remedial Action Program. Major chapters are: (1) Surplus Facilities Management Program; (2) Nuclear Facilities Decommissioning; (3) Formerly Utilized Sites Remedial Action Program; (4) Uranium Mill Tailings Remedial Action Program; (5) Grand Junction Remedial Action Program; (6) Uranium Mill Tailings Management; and (7) Technical Measurements Center. Chapter sections for chapters 1, 2, 4, and 6 include Design, Planning, and Regulations; Environmental Studies and Site Surveys; Decontamination Studies; Dismantlement and Demolition; Site Stabilization and Reclamation; Waste Disposal; Remedial Action Experience; and General Studies. The references within each chapter or section are arranged alphabetically by leading author. References having no individual author are arranged by corporate author or by title. Indexes are provided for the categories of author, corporate affiliation, title, publication description, geographic location, and keywords. The Appendix contains a list of frequently used acronyms.« less

  6. Remediation of problematic residents--A national survey.

    PubMed

    Bhatti, Nasir I; Ahmed, Aadil; Stewart, Michael G; Miller, Robert H; Choi, Sukgi S

    2016-04-01

    Despite careful selection processes, residency programs face the challenge of training residents who fall below minimal performance standards. Poor performance of a resident can endanger both patient safety and the reputation of the residency program. It is important, therefore, for a program to identify such residents and implement strategies for their successful remediation. The purpose of our study was to gather information on evaluation and remediation strategies employed by different otolaryngology programs. Cross-sectional survey. We conducted a national survey, sending a questionnaire to the program directors of 106 otolaryngology residency programs. We collected information on demographics of the program, identification of problematic residents, and remediation strategies. The response rate was 74.5%, with a 2% cumulative incidence of problematic residents in otolaryngology programs during the past 10 years. The most frequently reported deficiencies of problematic residents were unprofessional behavior with colleagues/staff (38%), insufficient medical knowledge (37%), and poor clinical judgment (34%). Personal or professional stress was the most frequently identified underlying problem (70.5%). Remediation efforts included general counseling (78%), frequent feedback sessions (73%), assignment of a mentor (58%), and extra didactics (47%). These remediation efforts failed to produce improvement in 23% of the identified residents, ultimately leading to their dismissal. The apparent deficiencies, underlying causes, and remediation strategies vary among otolaryngology residency programs. Based on the results of this survey, we offer recommendations for the early identification of problematic residents and a standardized remediation plan. NA. © 2015 The American Laryngological, Rhinological and Otological Society, Inc.

  7. North Slope (Wahluke Slope) expedited response action cleanup plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    The purpose of this action is to mitigate any threat to public health and the environment from hazards on the North Slope and meet the expedited response action (ERA) objective of cleanup to a degree requiring no further action. The ERA may be the final remediation of the 100-I-3 Operable Unit. A No Action record of decision (ROD) may be issued after remediation completion. The US Department of Energy (DOE) currently owns or administers approximately 140 mi{sup 2} (about 90,000 acres) of land north and east of the Columbia River (referred to as the North Slope) that is part ofmore » the Hanford Site. The North Slope, also commonly known as the Wahluke Slope, was not used for plutonium production or support facilities; it was used for military air defense of the Hanford Site and vicinity. The North Slope contained seven antiaircraft gun emplacements and three Nike-Ajax missile positions. These military positions were vacated in 1960--1961 as the defense requirements at Hanford changed. They were demolished in 1974. Prior to government control in 1943, the North Slope was homesteaded. Since the initiation of this ERA in the summer of 1992, DOE signed the modified Hanford Federal Agreement and Consent Order (Tri-Party Agreement) with the Washington Department of Ecology (Ecology) and the US Environmental Protection Agency (EPA), in which a milestone was set to complete remediation activities and a draft closeout report by October 1994. Remediation activities will make the North Slope area available for future non-DOE uses. Thirty-nine sites have undergone limited characterization to determine if significant environmental hazards exist. This plan documents the results of that characterization and evaluates the potential remediation alternatives.« less

  8. Remedial investigation/feasibility study for the Clinch River/Poplar Creek operable unit. Volume 5. Appendixes G, H, I, J

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1995-09-01

    The Quality Assurance/Quality Control (QA/QC) Program for Phase 2 of the Clinch River Remedial Investigation (CRRI) was designed to comply with both Department of Energy (DOE) Order 5700.6C and Environmental Protection Agency (EPA) QAMS-005/80 (EPA 1980a) guidelines. QA requirements and the general QA objectives for Phase 2 data were defined in the Phase 2 Sampling and Analysis Plan (SAP)-Quality Assurance Project Plan, and scope changes noted in the Phase 2 Sampling and Analysis Plan Addendum. The QA objectives for Phase 2 data were the following: (1) Scientific data generated will withstand scientific and legal scrutiny. (2) Data will be gatheredmore » using appropriate procedures for sample collection, sample handling and security, chain of custody (COC), laboratory analyses, and data reporting. (3) Data will be of known precision and accuracy. (4) Data will meet data quality objectives (DQOs) defined in the Phase 2 SAP.« less

  9. A Review of Remediation Programs in Pharmacy and Other Health Professions

    PubMed Central

    Fuller, Stephen H.; Hritcko, Philip M.; Matsumoto, Rae R.; Soltis, Denise A.; Taheri, Reza R.; Duncan, Wendy

    2010-01-01

    The Accreditation Council for Pharmacy Education (ACPE) Accreditation Standards and Guidelines 2007 states that colleges and schools of pharmacy must have a remediation policy. Few comparative studies on remediation have been published by colleges and schools of pharmacy, making it challenging to implement effective and validated approaches. Effective remediation policies should include early detection of problems in academic performance, strategies to help students develop better approaches for academic success, and facilitation of self-directed learning. While the cost of remediation can be significant, revenues generated either cover or exceed the cost of delivering the remediation service. Additional research on remediation in pharmacy education across the United States and abroad is needed to make sound decisions in developing effective policies. This paper provides a review of current practices and recommendations for remediation in pharmacy and health care education. PMID:20414438

  10. Final Quality Assurance Plan for the Remedial Investigations and Feasibility Studies of the Helicopter Hangar Area and the Fire Training Area at Fort George G. Meade, Maryland

    DTIC Science & Technology

    1995-05-05

    impoundment for a metal products manufacturer in Florida. During the site investigation, evidence of offsite contamination was found to be migrating onto...equipment, cross contamination through improper storage of samples) " Audit sampling documentation and procedures to ensure that samples are labeled...characterization of the occurrence and distribution of chemical contamination and site characteristics that are likely to influence human exposure or remediation

  11. Level 1 remedial investigation work plan, 300 Area Process Ponds

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    This report discusses the objectives of the site characterization for the 300 Area Process Ponds which are to identify and quantify contamination at the ponds and to estimate their potential impact on human health and the environment. The results of the site characterization will be used to identify any future actions related to contamination at the site and to identify any additional data requirements needed to support selection of a remedial action. 9 refs., 12 figs., 8 tabs.

  12. Final Remedial Investigation Sampling Plan Addendum. Milan Army Ammunition Plant Remedial Investigation Southern Study Area (Operable Unit No. 5)

    DTIC Science & Technology

    1997-09-01

    91-D-0012 Task Order No. 0007 2.4.7 Milan Army Ammunition Plant, Phytoremediation Pilot Study, USAEC, 1996 .. .............................. 2-28 2.5...indicated that heavy metal contamination (lead, chromium, and mercury ) was present at relatively low levels, and explosive contamination was limited to...and MI172 where lead was found at 22.9 j.g/1 and 18.4 Ig/l, respectively. 2.4.7 Milan Army Ammunition Plant, Phytoremediation Pilot Study, USAEC, 1996

  13. Strategies for Promoting Gatekeeper Course Success among Students Needing Remediation: Research Report for the Virginia Community College System

    ERIC Educational Resources Information Center

    Roksa, Josipa; Jenkins, Davis; Jaggars, Shanna Smith; Zeidenberg, Matthew; Cho, Sung-Woo

    2009-01-01

    The Virginia Community College System (VCCS) is engaged in a strategic planning process to improve performance beyond the goals in "Dateline 2009," the system's current vision and plan. A key objective is to encourage colleges to improve retention and academic success for students, particularly the substantial numbers who arrive…

  14. 24 CFR 1006.440 - Remedies for noncompliance.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 24 Housing and Urban Development 4 2011-04-01 2011-04-01 false Remedies for noncompliance. 1006... Remedies for noncompliance. (a) Remedies. If HUD finds that the DHHL has failed to comply substantially...) Hearing requirement. Before imposing remedies under this section, HUD will: (1) Take at least one of the...

  15. 24 CFR 146.45 - Exhaustion of administrative remedies.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... remedies. 146.45 Section 146.45 Housing and Urban Development Regulations Relating to Housing and Urban... Exhaustion of administrative remedies. (a) A complainant may file a civil action following the exhaustion of administrative remedies under the Act. Administrative remedies are exhausted if: (1) 180 days have elapsed since...

  16. 24 CFR 7.40 - Remedies and enforcement.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 24 Housing and Urban Development 1 2011-04-01 2011-04-01 false Remedies and enforcement. 7.40... Regard to Race, Color Religion, Sex, National Origin, Age, Disability or Reprisal Remedies, Enforcement and Compliance § 7.40 Remedies and enforcement. (a) Remedies and relief. When the Department, or the...

  17. The problem resident behavior guide: strategies for remediation.

    PubMed

    Williamson, Kelly; Quattromani, Erin; Aldeen, Amer

    2016-04-01

    In 2012, the ACGME supplemented the core competencies with outcomes-based milestones for resident performance within the six competency domains. These milestones address the knowledge, skills, abilities, attitudes, and experiences that a resident is expected to progress through during the course of training. Even prior to the initiation of the milestones, there was a paucity of EM literature addressing the remediation of problem resident behaviors and there remain few readily accessible tools to aid in the implementation of a remediation plan. The goal of the "Problem Resident Behavior Guide" is to provide specific strategies for resident remediation based on deficiencies identified within the framework of the EM milestones. The "Problem Resident Behavior Guide" is a written instructional manual that provides concrete examples of remediation strategies to address specific milestone deficiencies. The more than 200 strategies stem from the experiences of the authors who have professional experience at three different academic hospitals and emergency medicine residency programs, supplemented by recommendations from educational leaders as well as utilization of valuable education adjuncts, such as focused simulation exercises, lecture preparation, and themed ED shifts. Most recommendations require active participation by the resident with guidance by faculty to achieve the remediation expectations. The ACGME outcomes-based milestones aid in the identification of deficiencies with regards to resident performance without providing recommendations on remediation. The Problem Resident Behavior Guide can therefore have a significant impact by filling in this gap.

  18. The Development of Nitroxide Based Coatings for Biofilm Remediation- 154020

    DTIC Science & Technology

    2017-06-05

    AFRL-AFOSR-JP-TR-2017-0048 The Development of Nitroxide Based Coatings for Biofilm Remediation Kathryn Fairfull-Smith QUEENSLAND UNIVERSITY OF...for Biofilm Remediation - 154020 5a.  CONTRACT NUMBER 5b.  GRANT NUMBER FA2386-15-1-4087 5c.  PROGRAM ELEMENT NUMBER 61102F 6. AUTHOR(S) Kathryn...llisapi.dll Annual Report for AOARD Grant 15IOA087-154020 “The Development of Nitroxide Based Coatings for Biofilm Remediation ” 7th June 2017 PI and Co

  19. Environmental sampling plan for Kwajalein Atoll Lagoon: 2017 Kwajalein sampling event

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hamilton, T. F.

    2017-07-01

    Since the early 1980s, the U.S DOE Marshall Islands Program at LLNL has provided radiological monitoring of the marine and terrestrial environment at nuclear affected atolls in the northern Marshall Islands. The fundamental aim of these studies was to identify the level and distribution of key residual fallout radionuclide in the environment, improve understanding of prevalent radiation exposure pathways, and develop predictive dose assessments for resettled and resettling atoll population groups. These data and information were essential in terms of guiding the development of effective and environmentally protective remedial measures, and promoting potential actions to improve on food safety andmore » security.« less

  20. Remedial Investigation of Hanford Site Releases to the Columbia River - 13603

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lerch, J.A.; Hulstrom, L.C.; Sands, J.P.

    2013-07-01

    In south-central Washington State, the Columbia River flows through the U.S. Department of Energy Hanford Site. A primary objective of the Hanford Site cleanup mission is protection of the Columbia River, through remediation of contaminated soil and groundwater that resulted from its weapons production mission. Within the Columbia River system, surface water, sediment, and biota samples related to potential Hanford Site hazardous substance releases have been collected since the start of Hanford operations. The impacts from release of Hanford Site radioactive substances to the Columbia River in areas upstream, within, and downstream of the Hanford Site boundary have been previouslymore » investigated as mandated by the U.S. Department of Energy requirements under the Atomic Energy Act. The Remedial Investigation Work Plan for Hanford Site Releases to the Columbia River [1] was issued in 2008 to initiate assessment of the impacts under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 [2]. The work plan established a phased approach to characterize contaminants, assess current risks, and determine whether or not there is a need for any cleanup actions. Field investigation activities over a 120-mile stretch of the Columbia River began in October 2008 and were completed in 2010. Sampled media included surface water, pore water, surface and core sediment, island soil, and fish (carp, walleye, whitefish, sucker, small-mouth bass, and sturgeon). Information and sample results from the field investigation were used to characterize current conditions within the Columbia River and assess whether current conditions posed a risk to ecological or human receptors that would merit additional study or response actions under CERCLA. The human health and ecological risk assessments are documented in reports that were published in 2012 [3, 4]. Conclusions from the risk assessment reports are being summarized and integrated with remedial investigation/feasibility study (RI/FS) reports developed for upland areas, riparian areas, and groundwater in the Hanford Site River Corridor. The RI/FS reports will evaluate the impacts to soil, groundwater, and river sediments and lead to proposed cleanup actions and records of decision to address releases from the Hanford Site reactor operations. (authors)« less

  1. Characterization and remediation of 91B radioactive waste sites under performance based contracts at Lackland Air Force Base, San Antonio, Texas

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Trujillo, P.A.; Anderson, K.D.

    2007-07-01

    This paper describes the challenges behind the implementation of the characterization, remediation, and the Site Closure for three 91b Radioactive Wastes under a Performance Based Contract at Lackland Air Force Base, San Antonio, Texas. The Defense Environmental Restoration Program (DERP) was established by Section 211 of the Superfund Amendments and Reauthorization Act of 1986 (SARA). A part of the DERP provides for the cleanup of hazardous substances associated with past Department of Defense (DoD) activities and is consistent with the provisions of the Comprehensive Environmental Response, Compensation and Liability Act (CERCLA). It is the Air Force Installation Restoration Program (IRP)more » that has responsibility for the cleanup activities associated with CERCLA. Under contract to the Air Force Center for Environmental Excellence (AFCEE), the ECC Project Team, that included ECC, Cabrera Services, and Malcolm Pirnie, was responsible for the implementation of the actions at three sites. The three IRP (91b) sites included RW015, a 0.02 square kilometer (5.5 acre) site, RW017 a 0.003 square kilometer (0.9 acre) site, and RW033 an 0.356 square kilometer (88 acre) site. Adding to the complexities of the project were issues of archaeological areas of interest, jurisdictional wetlands, land open to hunting, issues of security as well as compliance to the myriad of air force base rules, regulations, and Air Force Instructions (AFI). The award of the project task order was July of 2005, the project plan phase started in July of 2005 followed by the remedy implementation that included characterization and remediation as required reached completion in June of 2006. The project closure including the development and approval final status survey reports, proposed plans, and decision documents that parallel the CERCLA process was initiated in June of 2006 and is expected to reach completion in August of 2007. This paper will focus on the issues of working to achieve radiological and chemical closure under a performance based contract vehicle and the challenges encountered while reaching this goal. (authors)« less

  2. 43 CFR 11.31 - What does the Assessment Plan include?

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... recovery period, and other such information required to perform the selected methodologies. (3) The... coordinated to the extent possible with any remedial investigation feasibility study or other investigation...

  3. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Paton, Ian

    The Rocky Flats Environmental Technology Site (RFETS) is a Department of Energy facility located approximately 16 miles northwest of Denver, Colorado. Processing and fabrication of nuclear weapons components occurred at Rocky Flats from 1952 through 1989. Operations at the Site included the use of several radionuclides, including plutonium-239/240 (Pu), americium-241 (Am), and various uranium (U) isotopes, as well as several types of chlorinated solvents. The historic operations resulted in legacy contamination, including contaminated facilities, process waste lines, buried wastes and surface soil contamination. Decontamination and removal of buildings at the site was completed in late 2005, culminating more than tenmore » years of active environmental remediation work. The Corrective Action Decision/Record of Decision was subsequently approved in 2006, signifying regulatory approval and closure of the site. The use of RFETS as a National Wildlife Refuge is scheduled to be in full operation by 2012. To develop a plan for remediating different types of radionuclide contaminants present in the RFETS environment required understanding the different environmental transport pathways for the various actinides. Developing this understanding was the primary objective of the Actinide Migration Evaluation (AME) project. Findings from the AME studies were used in the development of RFETS remediation strategies. The AME project focused on issues of actinide behavior and mobility in surface water, groundwater, air, soil and biota at RFETS. For the purposes of the AME studies, actinide elements addressed included Pu, Am, and U. The AME program, funded by DOE, brought together personnel with a broad range of relevant expertise in technical investigations. The AME advisory panel identified research investigations and approaches that could be used to solve issues related to actinide migration at the Site. An initial step of the AME was to develop a conceptual model to provide a qualitative description of the relationships among potential actinide sources and transport pathways at RFETS. One conceptual model was developed specifically for plutonium and americium, because of their similar geochemical and transport properties. A separate model was developed for uranium because of its different properties and mobility in the environment. These conceptual models were guidelines for quantitative analyses described in the RFETS Pathway Analysis Report, which used existing data from the literature as well as site-specific analyses, including field, laboratory and modeling studies to provide quantitative estimates of actinide migration in the RFETS environment. For pathways where more than one method was used to estimate offsite loads for a specific pathway, the method yielding the highest estimated off-site was used for comparison purposes. For all actinides studied, for pre-remediation conditions, air and surface water were identified to be the dominant transport mechanisms. The estimated annual airborne plutonium-239/240 load transported off site exceeded the surface water load by roughly a factor of 40. However, despite being the largest transport pathway, airborne radionuclide concentrations at the monitoring location with the highest measurements during the period studied were less than two percent of the allowable 10 milli-rem standard governing DOE facilities. Estimated actinide loads for other pathways were much less. Shallow groundwater was approximately two orders of magnitude lower, or 1/100 of the load conveyed in surface water. The estimated biological pathway load for plutonium was approximately five orders of magnitude less, or 1/100,000, of the load estimated for surface-water. The pathway analysis results were taken into consideration during subsequent remediation activities that occurred at the site. For example, when the 903 Pad area was remediated to address elevated concentrations of Pu and Am in the surface soil, portable tent structures were constructed to prevent wind and water erosion from occurring while remediation activities took place. Following remediation of the 903 Pad and surrounding area, coconut erosion blankets were installed to mitigate erosion effects while vegetation was reestablished [2]. These measures were effective tools to address the primary transport mechanisms identified, coupling the scientific understanding of the site with the remediation strategy.« less

  4. Nuclear facility decommissioning and site remedial actions: a selected bibliography

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Owen, P.T.; Knox, N.P.; Fielden, J.M.

    This bibliography contains 693 references with abstracts on the subject of nuclear facility decommissioning, uranium mill tailings management, and site remedial actions. Foreign, as well as domestic, literature of all types - technical reports, progress reports, journal articles, conference papers, symposium proceedings, theses, books, patents, legislation, and research project descriptions - has been included in this publication. The bibliography contains scientific (basic research as well as applied technology), economic, regulatory, and legal literature pertinent to the US Department of Energy's Remedial Action Program. Major chapters are Surplus Facilities Management Program, Nuclear Facilities Decommissioning, Formerly Utilized Sites Remedial Action Program, Uraniummore » Mill Tailings Remedial Action Program, Grand Junction Remedial Action Program, and Uranium Mill Tailings Management. Chapter sections for chapters 1 and 2 include: Design, Planning, and Regulations; Site Surveys; Decontamination Studies; Dismantlement and Demolition; Land Decontamination and Reclamation; Waste Disposal; and General Studies. The references within each chapter are arranged alphabetically by leading author. References having no individual author are arranged by corporate author or by title. Indexes are provided for (1) author; (2) corporate affiliation; (3) title; (4) publication description; (5) geographic location; and (6) keywords. An appendix of 202 bibliographic references without abstracts or indexes has been included in this bibliography. This appendix represents literature identified but not abstracted due to time constraints.« less

  5. 100-OL-1 Operable Unit Pilot Study: XRF Evaluation of Select Pre-Hanford Orchards

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bunn, Amoret L.; Fritz, Brad G.; Pulsipher, Brent A.

    Prior to the acquisition of land by the U.S. Department of War in February 1943 and the creation of the Hanford Site, the land along the Columbia River was home to over 1000 people. Farming and orchard operations by both homesteaders and commercial organizations were prevalent. Orchard activities and the associated application of lead arsenate pesticide ceased in 1943, when residents were moved from the Hanford Site at the beginning of the Manhattan Project. Today, the residues from historical application of lead arsenate pesticide persist in some locations on the Hanford Site. In 2012, the U.S. Department of Energy, U.S.more » Environmental Protection Agency, and Washington State Department of Ecology established the 100-OL-1 Operable Unit (OU) through the Hanford Federal Facility Agreement and Consent Order, known as the Tri-Party Agreement. The pre-Hanford orchard lands identified as the 100-OL-1 OU are located south of the Columbia River and east of the present-day Vernita Bridge, and extend southeast to the former Hanford townsite. The discontinuous orchard lands within 100-OL-1 OU are approximately 20 km2 (5000 ac). A pilot study was conducted to support the approval of the remedial investigation/feasibility study work plan to evaluate the 100-OL-1 OU. This pilot study evaluated the use of a field portable X-ray fluorescence (XRF) analyzer for evaluating lead and arsenic concentrations on the soil surface as an indicator of lead arsenate pesticide residues in the OU. The objectives of the pilot study included evaluating a field portable XRF analyzer as the analytical method for decision making, estimating the nature and extent of lead and arsenic in surface soils in four decision units, evaluating the results for the purpose of optimizing the sampling approach implemented in the remedial investigation, and collecting information to improve the cost estimate and planning the cultural resources review for sampling activities in the remedial investigation. Based on the results of the pilot study, the recommendations for the revision of the work plan are as follows: • characterize the surface soil using field portable XRF measurements with confirmatory inductively coupled plasma mass spectroscopy sampling for the remedial investigation • establish decision units of similar defined areas • establish a process for field investigation of soil concentrations exceeding the screening criteria at the border of the 100-OL-1 OU • define data quality objectives for the work plan using the results of the pilot study and refining the sampling approach for the remedial investigation.« less

  6. 24 CFR 886.105 - Content of application; Disclosure.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ...) For projects having a history of financial default, financial difficulties or deferred maintenance, a plan and a schedule for remedying such defaulted or deferred obligations; (e) Total number of units by...

  7. 24 CFR 886.105 - Content of application; Disclosure.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ...) For projects having a history of financial default, financial difficulties or deferred maintenance, a plan and a schedule for remedying such defaulted or deferred obligations; (e) Total number of units by...

  8. 24 CFR 886.105 - Content of application; Disclosure.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ...) For projects having a history of financial default, financial difficulties or deferred maintenance, a plan and a schedule for remedying such defaulted or deferred obligations; (e) Total number of units by...

  9. 24 CFR 886.105 - Content of application; Disclosure.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ...) For projects having a history of financial default, financial difficulties or deferred maintenance, a plan and a schedule for remedying such defaulted or deferred obligations; (e) Total number of units by...

  10. Independent Verification Survey of the Clean Coral Storage Pile at the Johnston Atoll Plutonium Contaminated Soil Remediation Project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Wilson-Nichols, M.J.; Egidi, P.V.; Roemer, E.K.

    2000-09-01

    f I The Oak Ridge National Laboratory (ORNL) Environmental Technology Section conducted an independent verification (IV) survey of the clean storage pile at the Johnston Atoll Plutonium Contaminated Soil Remediation Project (JAPCSRP) from January 18-25, 1999. The goal of the JAPCSRP is to restore a 24-acre area that was contaminated with plutonium oxide particles during nuclear testing in the 1960s. The selected remedy was a soil sorting operation that combined radiological measurements and mining processes to identify and sequester plutonium-contaminated soil. The soil sorter operated from about 1990 to 1998. The remaining clean soil is stored on-site for planned beneficialmore » use on Johnston Island. The clean storage pile currently consists of approximately 120,000 m3 of coral. ORNL conducted the survey according to a Sampling and Analysis Plan, which proposed to provide an IV of the clean pile by collecting a minimum number (99) of samples. The goal was to ascertain wi th 95% confidence whether 97% of the processed soil is less than or equal to the accepted guideline (500-Bq/kg or 13.5-pCi/g) total transuranic (TRU) activity.« less

  11. UK Policy on Doctor Remediation: Trajectories and Challenges.

    PubMed

    Price, Tristan; Archer, Julian

    2017-01-01

    Around the world, policy-makers, academics, and health service professionals have become increasingly aware of the importance of remediation, the process by which poor performance is "remedied," as part of the changing landscape of medical regulation. It is, therefore, an opportune time to critique the UK experience with remediation policy. This article frames, for the first time, the UK remediation policy as developing from a central policy aim that was articulated in the 1990s: to accelerate the identification of underperformance and, subsequently, remedy any problems identified as soon as possible. In pursuit of this aim, three policy trajectories have emerged: professionalizing and standardizing remediation provision; linking remediation with other forms of regulation, namely relicensure (known in the UK as medical revalidation); and fostering obligations for doctors to report themselves and others for remediation needs. The operationalization of policy along these trajectories, and the challenges that have arisen, has relevance for anyone seeking to understand or indeed improve remediation practices within any health care system. It is argued here that the UK serves as an example of the more general challenges posed by seeking to integrate remediation policy within broader frameworks of medical governance, in particular systems of relicensure, and the need to develop a solid evidence base for remediation practices.

  12. Values of Local Wisdom: A Potential to Develop an Assessment and Remedial

    ERIC Educational Resources Information Center

    Toharudin, Uus; Kurniawan, Iwan Setia

    2017-01-01

    Development assessment and remedial needs to be done because it is an important part of a learning process. This study aimed to describe the ability of student teachers of biology in developing assessment and remedial based on local wisdom. using a quasi-experimental research methods with quantitative descriptive analysis techniques. The research…

  13. 48 CFR 1352.219-72 - Notification of competition limited to eligible 8(a) concerns, Alternate III (Deviation).

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... limitation set forth in its approved business plan; and (2) The Offeror is in conformance with the Business Activity Targets set forth in its approved business plan or any remedial action directed by the SBA. (b) By...) (APR 2010) (a) Offers are solicited only from small business concerns expressly certified by the Small...

  14. 77 FR 57863 - Approval and Promulgation of Implementation Plans; State of Montana; State Implementation Plan...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-18

    ... of the multiple Class I areas that are affected by Corette, the Lime Spray Dryer (LSD) SO 2 control... preventing any future and remedying any existing man-made impairment of visibility in mandatory Class I areas... documents in the docket are listed on the www.regulations.gov Web site. Although listed in the index, some...

  15. 24 CFR 30.15 - Application of other remedies.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 24 Housing and Urban Development 1 2011-04-01 2011-04-01 false Application of other remedies. 30... remedies. A civil money penalty may be imposed in addition to other administrative sanctions or any other civil remedy or criminal penalty. ...

  16. ELECTROCHEMICAL REMEDIATION TECHNOLOGIES (ECRTS) - IN SITU REMEDIATION OF CONTAMINATED MARINE SEDIMENTS

    EPA Science Inventory

    This Innovative Technology Evaulation Report summarizes the results of the evaluation of the Electrochemical Remediation Technologies (ECRTs) process, developed by P2-Soil Remediation, Inc. (in partnership with Weiss Associates and Electro-Petroleum, Inc.). This evaluation was co...

  17. ELECTROCHEMICAL REMEDIATION TECHNOLOGIES (ECRTS) DEMONSTRATION BULLETIN

    EPA Science Inventory

    The ElectroChemical Remediation Technologies (ECRTs) process was developed by P2-Soil Remediation, Inc. P-2 Soil Remediation, Inc. formed a partnership with Weiss Associates and ElectroPetroleum, Inc. to apply the technology to contaminated sites. The ECRTs process was evaluated ...

  18. Use of technical and economic analysis for optimizing technology selection and remedial design for contaminated sites

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hardisty, P.E.; Brown, A.

    1996-12-01

    The decision to remediate a contaminated site can be seen from the macroeconomic and microeconomic viewpoints. Macroeconomics can be used to plan and account for the overall cost of pollution as part of a firm`s production, and thus make overall decisions on the real cost of pollution and the level of clean-up which may be called for. Valuation of damaged resources, option values and intrinsic worth is an important part of this process. Once the decision to remediate has been taken, the question becomes how best to remediate. Microeconomic analysis deals with providing efficient allocative decisions for reaching specified goals.more » it is safe to say that cost is one of the single most important factors in site clean-up decision making. A basic rule of remediation is often taken to be the maximization of contaminant mass removed per dollar spent. However, remediation may also be governed by other objectives and constraints. In some situations, minimization of time, rather than cost, could be the constraint. Or perhaps the objective could be to achieve a set level of clean-up for the lowest possible cost, even if a large program would result in unit-cost reductions. Evaluation of the economics of a clean-up project is directly linked to the objectives of the site owner, and the constraints within which the remediation is to be performed. Economic analysis of remedial options for containment of a 350,000 L hydrocarbon spill migrating through fractured rock into a river in Alberta, Canada, clear direction to the site owner.« less

  19. Regional groundwater flow model for C, K. L. and P reactor areas, Savannah River Site, Aiken, SC

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Flach, G.P.

    2000-02-11

    A regional groundwater flow model encompassing approximately 100 mi2 surrounding the C, K, L, and P reactor areas has been developed. The reactor flow model is designed to meet the planning objectives outlined in the General Groundwater Strategy for Reactor Area Projects by providing a common framework for analyzing groundwater flow, contaminant migration and remedial alternatives within the Reactor Projects team of the Environmental Restoration Department. The model provides a quantitative understanding of groundwater flow on a regional scale within the near surface aquifers and deeper semi-confined to confined aquifers. The model incorporates historical and current field characterization data upmore » through Spring 1999. Model preprocessing is automated so that future updates and modifications can be performed quickly and efficiently. The CKLP regional reactor model can be used to guide characterization, perform scoping analyses of contaminant transport, and serve as a common base for subsequent finer-scale transport and remedial/feasibility models for each reactor area.« less

  20. 24 CFR 1003.703 - Other remedies for noncompliance.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 24 Housing and Urban Development 4 2011-04-01 2011-04-01 false Other remedies for noncompliance. 1003.703 Section 1003.703 Housing and Urban Development REGULATIONS RELATING TO HOUSING AND URBAN... Program Performance § 1003.703 Other remedies for noncompliance. (a) Secretarial actions. If the Secretary...

  1. Procedures manual for the ORNL Radiological Survey Activities (RASA) Program

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Myrick, T.E.; Berven, B.A.; Cottrell, W.D.

    The portion of the radiological survey program performed by ORNL is the subject of this Procedures Manual. The RASA group of the Health and Safety Research Division (HASRD) at ORNL is responsible for the planning, conducting, and reporting of the results of radiological surveys at specified sites and associated vicinity properties. The results of these surveys are used by DOE in determining the need for and extent of remedial actions. Upon completion of the necessary remedial actions, the ORNL-RASA group or other OOS contractor may be called upon to verify the effectiveness of the remedial action. Information from these postremedialmore » action surveys is included as part of the data base used by DOE in certifying a site for unrestricted use.« less

  2. The effects of neurocognitive remediation on executive processing in patients with schizophrenia.

    PubMed

    Wykes, T; Reeder, C; Corner, J; Williams, C; Everitt, B

    1999-01-01

    Approaches to cognitive remediation have differed across studies. Most of the larger studies have concentrated on group treatments designed without the benefit of recent laboratory-based studies. The current study describes a randomized trial of an intensive cognitive remediation program involving individual daily sessions of 1 hour for up to 3 months. It targets executive functioning deficits (cognitive flexibility, working memory, and planning) that are known to be problematic in people with schizophrenia. Procedural learning, as well as the principles of errorless learning, targeted reinforcement, and massed practice, was the basis of the intervention. The program was compared with an alternative therapy (intensive occupational therapy) to control for some of the effects of therapeutic contact. Some improvements in cognition followed both therapies. A differential effect in favor of cognitive remediation therapy was found for tests in the cognitive flexibility and the memory subgroups. There was a trend for those receiving atypical antipsychotic medication to benefit more from cognitive remediation for tests of cognitive flexibility. Although there were no consistent changes in symptoms or social functioning between groups, if improvement in cognitive flexibility tasks reached a threshold then there is some evidence that social functioning improved, even over the short duration of the trial. In addition, cognitive remediation differentially improved self-esteem. This study supports the view that cognitive remediation can reduce cognitive deficits and that this reduction may affect social outcome, at least in the short term.

  3. Optimal groundwater security management policies by control of inexact health risks under dual uncertainty in slope factors.

    PubMed

    Lu, Hongwei; Li, Jing; Ren, Lixia; Chen, Yizhong

    2018-05-01

    Groundwater remediation is a complicated system with time-consuming and costly challenges, which should be carefully controlled by appropriate groundwater management. This study develops an integrated optimization method for groundwater remediation management regarding cost, contamination distribution and health risk under multiple uncertainties. The integration of health risk into groundwater remediation optimization management is capable of not only adequately considering the influence of health risk on optimal remediation strategies, but also simultaneously completing remediation optimization design and risk assessment. A fuzzy chance-constrained programming approach is presented to handle multiple uncertain properties in the process of health risk assessment. The capabilities and effectiveness of the developed method are illustrated through an application of a naphthalene contaminated case in Anhui, China. Results indicate that (a) the pump-and-treat remediation system leads to a low naphthalene contamination but high remediation cost for a short-time remediation, and natural attenuation significantly affects naphthalene removal from groundwater for a long-time remediation; (b) the weighting coefficients have significant influences on the remediation cost and the performances both for naphthalene concentrations and health risks; (c) an increased level of slope factor (sf) for naphthalene corresponds to more optimal strategies characterized by higher environmental benefits and lower economic sacrifice. The developed method could be simultaneously beneficial for public health and environmental protection. Decision makers could obtain the most appropriate remediation strategies according to their specific requirements with high flexibility of economic, environmental, and risk concerns. Copyright © 2018 Elsevier Ltd. All rights reserved.

  4. Cognitive Remediation for the Treatment of Cognitive Dysfunction in the Early Course of Psychosis.

    PubMed

    Lewandowski, Kathryn E

    2016-01-01

    The development of cognitive remediation programs has been a key step toward the creation of a treatment approach to address the cognitive-symptom domain in psychosis. Studies support the efficacy of cognitive remediation in producing moderate effects on cognition at the group level in patients with schizophrenia. Cognitive remediation may harness neuroplasticity in relevant systems that underpin the cognitive functions being addressed. Since neuroplasticity may be greater in people who (1) are younger and (2) have not yet experienced the consequences of long-term psychosis, cognitive remediation may be particularly effective in people in the early course of illness or in the prodrome, prior to the onset of frank symptoms. The present article reviews the evidence for implementing cognitive remediation in patients with recent-onset psychosis and people identified as being at high risk for developing schizophrenia, and also the evidence for cognitive remediation to modify neural targets. Promising findings suggest that cognitive remediation may be useful in addressing cognitive deficits in early-course and prodromal participants. Additionally, a growing literature using neuroimaging techniques demonstrates the ability of cognitive remediation paradigms to engage neural targets.

  5. 24 CFR 570.913 - Other remedies for noncompliance.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 24 Housing and Urban Development 3 2011-04-01 2010-04-01 true Other remedies for noncompliance. 570.913 Section 570.913 Housing and Urban Development Regulations Relating to Housing and Urban... § 570.913 Other remedies for noncompliance. (a) Action to enforce compliance. When the Secretary acts to...

  6. Test plan: the Czechowice Oil Refinery bioremediation demonstration of a process waste lagoon

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Altman, D.J.; Lombard, K.H.; Hazen, T.C.

    1997-03-31

    The remediation strategies that will be applied at the Czechowice Oil Refinery waste lagoon in Czechowice, Poland are designed, managed, and implemented under the direction of the Westinghouse Savannah River Company (WSRC) for the United States Department of Energy (DOE). WSRC will be assisted in the demonstration by The Institute for Ecology of Industrial Areas (IETU). This collaboration between IETU and DOE will provide the basis for international technology transfer of new and innovative remediation technologies that can be applied in Poland and the Eastern European Region as well.

  7. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Strickland, Christopher E.; Johnson, Christian D.; Lee, Brady D.

    Iodine-129 (129I) generated at the U.S. Department of Energy (DOE) Hanford Site during plutonium production was released to the subsurface, resulting in several large, though dilute, plumes in the groundwater, including the plume in the 200-UP-1 operable unit (OU). Because 129I is an uncommon contaminant, relevant remediation experience and scientific literature are limited, though work is under way to better understand the fate and transport of 129I in the environment and the effectiveness of potential remediation technologies. The recent UP-1 Evaluation Plan for Iodine and report on the Conceptual Model of Iodine Behavior in the Subsurface at the Hanford Sitemore » provide information on the history of contamination in the 200-UP-1 OU, relevant controlling processes (biological and geochemical), risk, the conceptual site model, and potential remedial options, which provided a foundation for this study. In this study, available information was compiled and used to categorize potential remediation technologies, culminating in a recommendation of promising technologies for further evaluation. Approaches to improve the technical information about promising technologies are also recommended in this study so that a subsequent evaluation of potential remediation alternatives can assess these technologies.« less

  8. Designing sustainable and economically attractive brownfield revitalization options using an integrated assessment model.

    PubMed

    Schädler, S; Morio, M; Bartke, S; Rohr-Zänker, R; Finkel, M

    2011-03-01

    We describe the development of an integrated assessment model which evaluates redevelopment options of large contaminated brownfields and we present the application of the model in a case study. Aiming to support efficient and sustainable revitalization and communication between stakeholders, the presented assessment model integrates three pinnacles of brownfield revitalization: (i) subsurface remediation and site preparation costs, (ii) market-oriented economic appraisal, and (iii) the expected contribution of planned future land use to sustainable community and regional development. For the assessment, focus is set on the early stage of the brownfield redevelopment process, which is characterized by limited data availability and by flexibility in land use planning and development scope. At this stage, revealing the consequences of adjustments and alterations in planning options can foster efficiency in communication between the involved parties and thereby facilitates the brownfield revitalization process. Results from the case-study application indicate that the integrated assessment provides help in the identification of land use options beneficial in both a sustainable and an economical sense. For the study site it is shown on one hand that brownfield redevelopment is not automatically in line with sustainable regional development, and on the other hand it is demonstrated that additional contributions to sustainability are not intrinsically tied to increased costs. Copyright © 2010 Elsevier Ltd. All rights reserved.

  9. Transition and Transfer of Remediated Formerly Utilized Sites Remedial Action Program (FUSRAP) Sites from U.S. Army Corps of Engineers (USACE) to U.S. Department of Energy (DOE)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Carpenter, Cliff; Castillo, Darina; Fatherly, Nicki

    The US Department of Energy (DOE) expects to receive the transfer of 10 FUSRAP Sites from the US Army Corps of Engineers (USACE) over the next 10 years; however, the timing of the transfers is highly dependent upon federal funding of the ongoing remedial actions. When remediation for each site is complete and the 2-year operations and maintenance period has concluded, each site will transfer from USACE to DOE for long-term surveillance and maintenance (LTS&M). US DOE’s Office of Legacy Management (LM) will accept program responsibility for these sites and conduct LTS&M activities required to maintain protectiveness, preserve site-specific knowledge,more » and retain the cleanup and stewardship records while keeping stakeholders informed. Since the last FUSRAP site transfer occurred in 2007, LM in coordination with USACE intends to establish a transition process to promote the seamless transfer of sites from the time when the first record of decision is signed to the completion of FUSRAP activities. The approach to transfer active FUSRAP sites to completed sites status has been historically outlined in foundational documents such as the 1999 Memorandum of Understanding and supporting letters of agreement between the two agencies. As more complex FUSRAP sites are completed, this transition process will provide a model between the two agencies to communicate future long-term care liabilities. Ultimately, the FUSRAP transition process is structured to acquire and preserve site knowledge and information necessary for protecting the environment and public health. As of 2015, LM has transitioned and accepted programmatic responsibility for over 90 sites. From LM’s perspective, successful transition of any site includes understanding the long-term environmental liabilities. LM uses site transition framework requirements from past transitions to develop site-specific transition plans. Site-specific transition plans are developed by LM in coordination with USACE and executed during the 2-year operations and maintenance period. An integrated project team of subject matter experts is assembled to address the conditions of the transitioning site; acquire a site records collection; evaluate site operations and final site conditions and associated risks; identify and contact stakeholders; and document the basis for site LTS&M requirements. While the majority of the transition activities are completed by LM, close coordination between US DOE LM and USACE throughout this process is essential for an effective and seamless transfer to assure that there is no lapse in site protectiveness.« less

  10. Effects of Planning and Goal Setting on Reducing Latency to Task Engagement for Struggling Readers in Middle School

    ERIC Educational Resources Information Center

    Stevenson, Nathan A.

    2016-01-01

    The current study examined the effect of a planning and goal-setting intervention in reducing latency to task engagement. This study used a multiple baseline design across participants for two seventh-grade and two eighth-grade students in a remedial reading class. The behavioral intervention was administered in small groups at the start of each…

  11. Oppenheimer's Box of Chocolates: Remediation of the Manhattan Project Landfill at Los Alamos National Laboratory - 12283

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Allen, Donald L.; Ramsey, Susan S.; Finn, Kevin P.

    2012-07-01

    Material Disposal Area B (MDA B) is the oldest radioactive waste disposal facility at Los Alamos National Laboratory. Operated from 1944-48, MDA B was the disposal facility for the Manhattan Project. Recognized as one of the most challenging environmental remediation projects at Los Alamos, the excavation of MDA B received $110 million from the American Recovery and Reinvestment Act of 2009 to accelerate this complex remediation work. Several factors combined to create significant challenges to remediating the landfill known in the 1940's as the 'contaminated dump'. The secrecy surrounding the Manhattan Project meant that no records were kept of radiologicalmore » materials and chemicals disposed or of the landfill design. An extensive review of historical documents and interviews with early laboratory personnel resulted in a list of hundreds of hazardous chemicals that could have been buried in MDA B. Also, historical reports of MDA B spontaneously combusting on three occasions -with 50-foot flames and pink smoke spewing across the mesa during the last incident in 1948-indicated that hazardous materials were likely present in MDA B. To complicate matters further, though MDA B was located on an isolated mesa in the 1940's, the landfill has since been surrounded by a Los Alamos commercial district. The local newspaper, hardware store and a number of other businesses are located directly across the street from MDA B. This close proximity to the public and the potential for hazardous materials in MDA B necessitated conducting remediation work within protective enclosures. Potential chemical hazards and radiological inventory were better defined using a minimally intrusive sampling method called direct push technology (DPT) prior to excavation. Even with extensive sampling and planning the project team encountered many surprises and challenges during the project. The one area where planning did not fail to meet reality was safety. There were no serious worker injuries and the minor injuries recorded were those common to construction type activities. Extensive monitoring along the site boundary demonstrated that no hazardous chemicals were released and radiological dose to the public was within administrative limits. More than three years of effort by the LANL project team went into the planning for remediation of Material Disposal Area B. Hundreds of historical documents were reviewed; retired personnel were extensively interviewed and noninvasive techniques were used to characterize the site. The information collected was incorporated into the safety requirements, cost estimate, schedule and primary execution plan for the project. Ultimately the waste volume managed by the project approached 40000 m{sup 3}, more than double the original project estimate. This increase had a major impact on both project cost and schedule. Nuclear safety requirements for the project were based on an estimated MDA B radionuclide inventory of 12 PE-Ci. When excavation was complete over 123 PE-Ci had been removed from the trenches. The radionuclide inventory at MDA B was an order of magnitude higher than estimated. Work at MDA B could not have proceeded without the safety basis exemption from DOE-HQ. The one area where planning did not fail to meet reality was safety. There were no serious worker injuries and the minor injuries recorded were those common to construction type activities. Extensive monitoring along the site boundary demonstrated that no hazardous chemicals were released and radiological dose to the public was within administrative limits. (authors)« less

  12. Chemical Remediation of Nickel(II) Waste: A Laboratory Experiment for General Chemistry Students

    ERIC Educational Resources Information Center

    Corcoran, K. Blake; Rood, Brian E.; Trogden, Bridget G.

    2011-01-01

    This project involved developing a method to remediate large quantities of aqueous waste from a general chemistry laboratory experiment. Aqueous Ni(II) waste from a general chemistry laboratory experiment was converted into solid nickel hydroxide hydrate with a substantial decrease in waste volume. The remediation method was developed for a…

  13. Developing Sediment Remediation Goals at Superfund Sites Based on Pore Water for the Protection of Benthic Organisms from Direct Toxicity to Non-ionic Organic Contaminants

    EPA Science Inventory

    A methodology for developing remediation goals for sites with contaminated sediments is provided. The remediation goals are based upon the concentrations of chemicals in the sediment interstitial water measured using the passive sampling technique. The passive sampling technique ...

  14. 24 CFR 26.53 - Exhaustion of administrative remedies.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... remedies. 26.53 Section 26.53 Housing and Urban Development Office of the Secretary, Department of Housing... Hearings § 26.53 Exhaustion of administrative remedies. In order to fulfill the requirement of exhausting administrative remedies, a party must seek Secretarial review under § 26.52 prior to seeking judicial review of...

  15. 22 CFR 215.12 - Penalties and remedies.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 22 Foreign Relations 1 2011-04-01 2011-04-01 false Penalties and remedies. 215.12 Section 215.12 Foreign Relations AGENCY FOR INTERNATIONAL DEVELOPMENT REGULATIONS FOR IMPLEMENTATION OF PRIVACY ACT OF 1974 § 215.12 Penalties and remedies. The provisions of the Act relating to penalties and remedies are...

  16. 22 CFR 213.4 - Other remedies.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 22 Foreign Relations 1 2011-04-01 2011-04-01 false Other remedies. 213.4 Section 213.4 Foreign Relations AGENCY FOR INTERNATIONAL DEVELOPMENT CLAIMS COLLECTION General § 213.4 Other remedies. (a) This... remedies and sanctions available to the Agency under this part for collecting debts are not intended to be...

  17. 22 CFR 213.4 - Other remedies.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 22 Foreign Relations 1 2010-04-01 2010-04-01 false Other remedies. 213.4 Section 213.4 Foreign Relations AGENCY FOR INTERNATIONAL DEVELOPMENT CLAIMS COLLECTION General § 213.4 Other remedies. (a) This... remedies and sanctions available to the Agency under this part for collecting debts are not intended to be...

  18. 22 CFR 215.12 - Penalties and remedies.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 22 Foreign Relations 1 2010-04-01 2010-04-01 false Penalties and remedies. 215.12 Section 215.12 Foreign Relations AGENCY FOR INTERNATIONAL DEVELOPMENT REGULATIONS FOR IMPLEMENTATION OF PRIVACY ACT OF 1974 § 215.12 Penalties and remedies. The provisions of the Act relating to penalties and remedies are...

  19. 24 CFR 81.46 - Remedial actions.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 24 Housing and Urban Development 1 2010-04-01 2010-04-01 false Remedial actions. 81.46 Section 81... FEDERAL HOME LOAN MORTGAGE CORPORATION (FREDDIE MAC) Fair Housing § 81.46 Remedial actions. (a) General. The Secretary shall direct the GSEs to take one or more remedial actions, including suspension...

  20. 24 CFR 81.46 - Remedial actions.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 24 Housing and Urban Development 1 2011-04-01 2011-04-01 false Remedial actions. 81.46 Section 81... FEDERAL HOME LOAN MORTGAGE CORPORATION (FREDDIE MAC) Fair Housing § 81.46 Remedial actions. (a) General. The Secretary shall direct the GSEs to take one or more remedial actions, including suspension...

  1. An Information System for Brownfield Regeneration: providing customised information according to stakeholders' characteristics and needs.

    PubMed

    Rizzo, Erika; Pizzol, Lisa; Zabeo, Alex; Giubilato, Elisa; Critto, Andrea; Cosmo, Luca; Marcomini, Antonio

    2018-07-01

    In the EU brownfield presence is still considered a widespread problem. Even though, in the last decades, many research projects and initiatives developed a wealth of methods, guidelines, tools and technologies aimed at supporting brownfield regeneration. However, this variety of products had and still has a limited practical impact on brownfield revitalisation success, because they are not used in their entire potential due to their scarce visibility. Also, another problem that stakeholders face is finding customised information. To overcome this non-visibility and not-sufficient customisation of information, the Information System for Brownfield Regeneration (ISBR) has been developed, based on Artificial Neural Networks, which allows understanding stakeholders' information needs by providing tailored information. The ISBR has been tested by stakeholders from the EU project TIMBRE case studies, located in the Czech Republic, Germany, Poland and Romania. Data gained during tests allowed to understand stakeholders' information needs. Overall, stakeholders showed to be concerned first on remediation aspects, then on benchmarking information, which are valuable to improve practices in the complex field of brownfield regeneration, and then on the relatively new issue of sustainability applied to brownfield regeneration and remediation. Mature markets confirmed their interest for remediation-related aspects, highlighting the central role that risk assessment plays in the process. Emerging markets showed to seek information and tools for strategic and planning issues, like brownfield inventories and georeferenced data sets. Results led to conclude that a new improved platform, combining the ISBR functionalities with geo-referenced ones, would be useful and could represent a further research application. Copyright © 2018 Elsevier Ltd. All rights reserved.

  2. CONSIDERATIONS FOR INNOVATIVE REMEDIATION TECHNOLOGY EVALUATION SAMPLING PLANS

    EPA Science Inventory

    Field trials of innovative subsurface cleanup technologies require the use of integrated site characterization approaches to obtain critical design parameters, to evaluate pre-treatment contaminant distributions, and to assess process efficiency. This review focuses on the trans...

  3. Treatment Study Plan for Nitrate Salt Waste Remediation Revision 1.0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Juarez, Catherine L.; Funk, David John; Vigil-Holterman, Luciana R.

    2016-03-07

    The two stabilization treatment methods that are to be examined for their effectiveness in the treatment of both the unremediated and remediated nitrate salt wastes include (1) the addition of zeolite and (2) cementation. Zeolite addition is proposed based on the results of several studies and analyses that specifically examined the effectiveness of this process for deactivating nitrate salts. Cementation is also being assessed because of its prevalence as an immobilization method used for similar wastes at numerous facilities around the DOE complex, including at Los Alamos. The results of this Treatment Study Plan will be used to provide themore » basis for a Resource Conservation and Recovery Act (RCRA) permit modification request of the LANL Hazardous Waste Facility Permit for approval by the New Mexico Environment Department-Hazardous Waste Bureau (NMED-HWB) of the proposed treatment process and the associated facilities.« less

  4. Remedial investigation/feasibility study of the Clinch River/Poplar Creek operable unit. Volume 1, main text

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    This document is the combined Remedial Investigation/Feasibility Study (RI/FS) Report for the Clinch River/Poplar Creek Operable Unit (CR/PC OU), an off-site OU associated with environmental restoration activities at the U.S. Department of Energy (DOE) Oak Ridge Reservation (ORR). As a result of past, present, and potential future releases of hazardous substances into the environment, the ORR was placed on the National Priorities List in December 1989 (54 FR 48184). Sites on this list must be investigated for possible remedial action, as required by the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA, 42 U.S.C. 9601, et seq.). This report documentsmore » the findings of the remedial investigation of this OU and the feasibility of potential remedial action alternatives. These studies are authorized by Sect. 117 of CERCLA and were conducted in accordance with the requirements of the National Contingency Plan (40 CFR Part 300). DOE, the U.S. Environmental Protection Agency (EPA), and the Tennessee Department of Environment and Conservation (TDEC) have entered into a Federal Facility Agreement (FFA), as authorized by Sect. 120 of CERCLA and Sects. 3008(h) and 6001 of the Resource Conservation and Recovery Act (RCRA) (42 U.S.C. 6901, et seq.). The purpose of this agreement is to ensure a coordinated and effective response for all environmental restoration activities occurring at the ORR. In addition to other responsibilities, the FFA parties mutually define the OU boundaries, set remediation priorities, establish remedial investigation priorities and strategies, and identify and select remedial actions. A copy of this FFA is available from the DOE Information Resource Center in Oak Ridge, Tennessee.« less

  5. HCH contamination from former pesticide production in Brazil--a challenge for the Stockholm Convention implementation.

    PubMed

    Torres, J P M; Fróes-Asmus, C I R; Weber, R; Vijgen, J M H

    2013-04-01

    Hexachlorocyclohexane (HCH) isomers (α-, β- and γ- HCH [lindane]) were recently added to the list of persistent organic pollutants regulated by the Stockholm Convention, and therefore, the legacy of HCH and lindane production has become an issue of global relevance. The production of lindane with the much larger quantities of associated waste isomers has generated large waste deposits and contaminated sites. This article presents an overview of HCH-polluted sites in Brazil as a basis for further activities related to the Stockholm Convention. The locations of HCH stockpiles and contaminated sites in Brazil arising from production and formulation have been compiled and mapped. This shows that the measures taken over the past 25 years have not resulted in remediation of the HCH pollution. An exposure risk study has been summarised for one major site and is included to demonstrate the contemporary relevance of the contamination. Major site remediation efforts are planned at one site but people live close to several other sites, and there is an urgent need of further assessments and remediation to ensure the protection of human health and the environment. The Stockholm Convention requires a systematic approach and should be adopted for the assessment of all sites and appropriate isolation/remediation measures should be facilitated. The appropriate planning of these activities for the production site in Rio de Janeiro could be a positive contribution for Rio+20 highlighting that green economy and sustainable production also include the appropriate management of legacies of historic production of an industrial sector (here the organochlorine industry).

  6. Environmental restoration and waste management: Robotics technology development program: Robotics 5-year program plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    In FY 1990 Robotics Technology Development Program (RTDP) planning teams visited five DOE sites. These sites were selected by the Office of Technology Development to provide a needs basis for developing a 5-Year Plan. Visits to five DOE sites provided identification of needs for robotics technology development to support Environmental Restoration and Waste Management (ER WM) projects at those sites. Additional site visits will be conducted in the future to expand the planning basis. This volume summarizes both the results of the site visits and the needs and requirements of the priority ER WM activities at the sites, including potentialmore » needs for robotics and remote systems technology. It also discusses hazards associated with the site activities and any problems or technical uncertainties associated with dealing with the hazards in the performance of the ER WM work. Robotic or remote systems currently under development for remediation projects or waste operations are also discussed. The information in this document is organized principally by site, activity, and priority. Section 2.0, Site Needs, is based on information from the site visit reports and provides a summary which focuses on the site needs and requirements for each priority activity. Section 2.0 also records evaluations and discussions by the RTDP team following the site visit. Section 3.0, Commonality Assessment, documents similar site needs where common, or cross-cutting, robotics technology might be applied to several activities. Section 4.0 contains a summary of the site needs and requirements in tabular form. 1 tab.« less

  7. Critical review of decision support tools for sustainability assessment of site remediation options.

    PubMed

    Huysegoms, Lies; Cappuyns, Valérie

    2017-07-01

    In Europe alone, there are more than 2,5 million potentially contaminated sites of which 14% are expected to require remediation. Contaminated soil and groundwater can cause damage to human health as well as to valuable ecosystems. Globally more attention has been paid to this problem of soil contamination in the past decades. For example, more than 58 000 sites have been remediated in Europe between 2006 and 2011. Together with this increase in remediation projects there has been a surge in the development of new remediation technologies and decision support tools to be able to match every site and its specific characteristics to the best possible remediation alternative. In the past years the development of decision support tools (DST) has evolved in a more sustainable direction. Several DSTs added the claim not only to denote effective or technologically and economically feasible remediation alternatives but also to point out the more or most sustainable remediation alternatives. These trends in the evaluation of site remediation options left users with a confusing clew of possibly applicable tools to assist them in decision making for contaminated site remediation. This review provides a structured overview on the extent decision support tools for contaminated site remediation, that claim to assist in choosing the most sustainable remediation alternative, actually include the different elements of sustainability proposed in our assessment framework. The review contains an in-depth analysis of thirteen tools specifically developed to assess the sustainability of site remediation alternatives. This analysis is based on six criteria derived from the definition of sustainable development of the Brundtland report. The six criteria were concretized by using the three pillars of sustainability, applied to site remediation according to the SuRF-UK framework, two criteria derived from Life Cycle Assessment and Cost-Benefit Analysis, and an 'User friendly' criterion. These elements come together in a framework, drafted for this study, containing six criteria covering the environmental, economic, social, time, uncertainty aspects and user friendliness of a sustainable site remediation. The main remarks uncovered by this review are the imbalance of used indicators still expressing a strong preference for the environmental aspect at the expense of the economic and social aspects of sustainability, the lack of consistency in the terminology used within the field and the failure in adapting released tools to recent legislation or scientific advancements. Copyright © 2017 Elsevier Ltd. All rights reserved.

  8. 1996 monitoring report for the Gunnison, Colorado, wetlands mitigation plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1996-12-01

    The US Department of Energy (DOE) administers the Uranium Mill Tailings Remedial Action (UMTRA) Project to clean up uranium mill tailings and other surface contamination at 24 abandoned uranium mill sites in 10 states. One of these abandoned mill sites was near the town of Gunnison, Colorado. Surface remediation was completed at the Gunnison site in December 1995. Remedial action resulted in the elimination of 4.3 acres of wetlands and mitigation of this loss is through the enhancement of 17.8 acres of riparian plant communities in six spring-fed areas on US Bureau of Land Management mitigation sites. A five-year monitoringmore » program was then implemented to document the response of vegetation and wildlife to the exclusion of livestock. This report provides the results of the third year of the monitoring program.« less

  9. Amarillo National Resource Center for plutonium. Work plan progress report, November 1, 1995--January 31, 1996

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Cluff, D.

    1996-04-01

    The Center operates under a cooperative agreement between DOE and the State of Texas and is directed and administered by an education consortium. Its programs include developing peaceful uses for the materials removed from dismantled weapons, studying effects of nuclear materials on environment and public health, remedying contaminated soils and water, studying storage, disposition, and transport of Pu, HE, and other hazardous materials removed from weapons, providing research and counsel to US in carrying out weapons reductions in cooperation with Russia, and conducting a variety of education and training programs.

  10. Remedial Mathematics: Diagnostic and Prescriptive Approaches. Papers from the First National Conference on Remedial Mathematics.

    ERIC Educational Resources Information Center

    Higgins, Jon L., Ed.; Heddens, James W., Ed.

    The papers in this publication were developed from speeches and reactions presented at the first National Conference on Remedial Mathematics held at Kent State University in 1974. Papers focus on identifying and describing the remedial mathematics student, classroom diagnosis, clinical diagnosis, the diagnostic process, and promising procedures…

  11. Ecological effects of contaminants in McCoy Branch, 1989-1990

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ryon, M.G.

    1992-01-01

    The 1984 Hazardous and Solid Waste Amendments to the Resource Conservation and Recovery Act (RCRA) required assessment of all current and former solid waste management units. Such a RCRA Facility Investigation (RFI) was required of the Y-12 Plant for their Filled Coal Ash Pond on McCoy Branch. Because the disposal of coal ash in the ash pond, McCoy Branch, and Rogers Quarry was not consistent with the Tennessee Water Quality Act, several remediation steps were implemented or planned for McCoy Branch to address disposal problems. The McCoy Branch RFI plan included provisions for biological monitoring of the McCoy Branch watershed.more » The objectives of the biological monitoring were to: (1) document changes in biological quality of McCoy Branch after completion of a pipeline and after termination of all discharges to Rogers Quarry, (2) provide guidance on the need for additional remediation, and (3) evaluate the effectiveness of implemented remedial actions. The data from the biological monitoring program will also determine if the classified uses, as identified by the State of Tennessee, of McCoy Branch are being protected and maintained. This report discusses results from toxicity monitoring of snails fish community assessment, and a Benthic macroinvertebrate community assessment.« less

  12. Sociotechnical challenges to developing technologies for patient access to health information exchange data

    PubMed Central

    Ancker, Jessica S; Miller, Melissa C; Patel, Vaishali; Kaushal, Rainu

    2014-01-01

    Background Providing patients with access to their medical data is widely expected to help educate and empower them to manage their own health. Health information exchange (HIE) infrastructures could potentially help patients access records across multiple healthcare providers. We studied three HIE organizations as they developed portals to give consumers access to HIE data previously exchanged only among healthcare organizations. Objective To follow the development of new consumer portal technologies, and to identify barriers and facilitators to patient access to HIE data. Methods Semistructured interviews of 15 key informants over a 2-year period spanning the development and early implementation of three new projects, coded according to a sociotechnical framework. Results As the organizations tried to develop functionality that fully served the needs of both providers and patients, plans were altered by technical barriers (primarily related to data standardization) and cultural and legal issues surrounding data access. Organizational changes also played an important role in altering project plans. In all three cases, patient access to data was significantly scaled back from initial plans. Conclusions This prospective study revealed how sociotechnical factors previously identified as important in health information technology success and failure helped to shape the evolution of three novel consumer informatics projects. Barriers to providing patients with seamless access to their HIE data were multifactorial. Remedies will have to address technical, organizational, cultural, and other factors. PMID:24064443

  13. Ambler - An autonomous rover for planetary exploration

    NASA Technical Reports Server (NTRS)

    Bares, John; Hebert, Martial; Kanade, Takeo; Krotkov, Eric; Mitchell, Tom

    1989-01-01

    The authors are building a prototype legged rover, called the Ambler (loosely an acronym for autonomous mobile exploration robot) and testing it on full-scale, rugged terrain of the sort that might be encountered on the Martian surface. They present an overview of their research program, focusing on locomotion, perception, planning, and control. They summarize some of the most important goals and requirements of a rover design and describe how locomotion, perception, and planning systems can satisfy these requirements. Since the program is relatively young (one year old at the time of writing) they identify issues and approaches and describe work in progress rather than report results. It is expected that many of the technologies developed will be applicable to other planetary bodies and to terrestrial concerns such as hazardous waste assessment and remediation, ocean floor exploration, and mining.

  14. Case study: Use of isothiazolinone and nitro-morpholine biocides to control microbial contamination in diesel and gasoline storage and distribution systems

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Chesneau, H.L.; Passman, F.J.; Daniels, D.

    1995-05-01

    Responding to feed-back from its retail outlet network, a major, vertically integrated petroleum company undertook to diagnose and remediate diesel and gasoline performance problems. Analysis of samples from tanks at refinery, distribution terminal and retail outlet sites established that uncontrolled microbial contamination was rampant throughout the distribution system. The company then developed and instituted a two-phase action plan. During Phase I, all tanks received corrective (shock) biocide treatment preceding mechanical tank cleaning and fuel polishing. An ongoing Phase II program currently includes routine sampling and analysis combined with periodic preventive biocide treatment. This paper describes the initial problem diagnosis, correctivemore » action plan and preventive program; recommending the Phase II program as a model for all companies involved with refining, distribution or retailing gasoline.« less

  15. Remedial Investigation Work Plan for Upper East Fork Poplar Creek Operable Unit 3 at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee. Environmental Restoration Program

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1993-08-01

    Upper East Fork Popular Creek Operable Unit 3 (UEFPC OU 3) is a source term OU composed of seven sites, and is located in the western portion of the Y-12 Plant. For the most part, the UEFPC OU 3 sites served unrelated purposes and are geographically removed from one another. The seven sites include the following: Building 81-10, the S-2 Site, Salvage Yard oil storage tanks, the Salvage Yard oil/solvent drum storage area, Tank Site 2063-U, the Salvage Yard drum deheader, and the Salvage Yard scrap metal storage area. All of these sites are contaminated with at least one ormore » more hazardous and/or radioactive chemicals. All sites have had some previous investigation under the Y-12 Plant RCRA Program. The work plan contains summaries of geographical, historical, operational, geological, and hydrological information specific to each OU 3 site. The potential for release of contaminants to receptors through various media is addressed, and a sampling and analysis plan is presented to obtain objectives for the remedial investigation. Proposed sampling activities are contingent upon the screening level risk assessment, which includes shallow soil sampling, soil borings, monitoring well installation, groundwater sampling, and surface water sampling. Data from the site characterization activities will be used to meet the above objectives. A Field Sampling Investigation Plan, Health and Safety Plan, and Waste Management Plan are also included in this work plan.« less

  16. PUBLICATIONS (SUBSURFACE PROTECTION AND REMEDIATION DIVISION

    EPA Science Inventory

    SPRD's Subsurface Remediation Information Center (SRIC) provides publication distribution of highly specialized scientific and technical information developed by and through SPRD relating to groundwater protection and remediation and ecosystem restoration. The SRIC maintains a b...

  17. Using generic tool kits to build intelligent systems

    NASA Technical Reports Server (NTRS)

    Miller, David J.

    1994-01-01

    The Intelligent Systems and Robots Center at Sandia National Laboratories is developing technologies for the automation of processes associated with environmental remediation and information-driven manufacturing. These technologies, which focus on automated planning and programming and sensor-based and model-based control, are used to build intelligent systems which are able to generate plans of action, program the necessary devices, and use sensors to react to changes in the environment. By automating tasks through the use of programmable devices tied to computer models which are augmented by sensing, requirements for faster, safer, and cheaper systems are being satisfied. However, because of the need for rapid cost-effect prototyping and multi-laboratory teaming, it is also necessary to define a consistent approach to the construction of controllers for such systems. As a result, the Generic Intelligent System Controller (GISC) concept has been developed. This concept promotes the philosophy of producing generic tool kits which can be used and reused to build intelligent control systems.

  18. RAWP Progress Report August 19, 2011 - Combined

    EPA Pesticide Factsheets

    Combines cover letter and Progress Report #2 as required in Residential Soil Remedial Action Work Plan (RAWP)-Phase 1, with the Analytical Laboratory Report of Walter Coke Inc site in Birmingham AL, August 16, 2011, prepared by TestAmerica Laboratories.

  19. 48 CFR 52.219-18 - Notification of Competition Limited to Eligible 8(a) Concerns.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... conformance with the Business Activity Targets set forth in its approved business plan or any remedial action... business manufacturers or processors in the Federal market in accordance with 19.502-2(c), delete...

  20. Computer Based Expert Systems.

    ERIC Educational Resources Information Center

    Parry, James D.; Ferrara, Joseph M.

    1985-01-01

    Claims knowledge-based expert computer systems can meet needs of rural schools for affordable expert advice and support and will play an important role in the future of rural education. Describes potential applications in prediction, interpretation, diagnosis, remediation, planning, monitoring, and instruction. (NEC)

  1. Data quality objectives for TWRS privatization phase 1: confirm tank T is an appropriate feed source for low-activity waste feed batch X

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NGUYEN, D.M.

    1999-06-01

    The US. Department of Energy, Richland Operations Office (DOE-RL) has initiated Phase 1 of a two-phase privatization strategy for treatment and immobilization of low-activity waste (LAW) currently being managed by the Hanford Tank Waste Remediation System (TWRS) Project. In this strategy, DOE will purchase services from a contractor-owned and operated facility under a fixed price. The Phase 1 TWRS privatization contract requires that the Project Hanford Management Contract (PHMC) contractors, on behalf of DOE, deliver LAW feed in specified quantities and composition to the Privatization Contractor in a timely manner (DOE-RL 1996). Additional requirements are imposed by the interface controlmore » document (ICD-19) for LAW feed (PHMC 1997). In response to these requirements, the Tank Waste Remediation System Operation and Utilization Plan (TWRSO and UP) (Kirkbride et al. 1997) was prepared by the PHMC. The TWRSO and UP, as updated by the Readiness-To-Proceed deliverable (Payne et al. 1998), establishes the baseline operating scenario for the delivery of LAW feed to the Privatization Contractor. The scenario specifies tanks from which LAW will be provided for each feed batch, the operational activities needed to prepare and deliver each batch, and the timing of these activities. The operating scenario was developed based on current knowledge of waste composition and chemistry, waste transfer methods, and operating constraints, such as tank farm logistics and availability of tank space. A project master baseline schedule (PMBS) has been developed to implement the operating scenario. The PMBS also includes activities aimed at reducing programmatic risks. One of the activities, ''Confirm Plans and Requirements,'' was identified to verify the basis used to develop the scenario. Additional data on waste quantity, physical and chemical characteristics, and transfer properties will be needed to support this activity. This document describes the data quality objective (DQO) process undertaken to assme appropriate data will be collected to support the activity, ''Confirm Tank Plans and Requirements.'' The DQO process was implemented in accordance with the TWRS DQO process (Banning 1997) with some modifications to accommodate project or tank-specific requirements and constraints.« less

  2. Improving clerkship preparedness: a hospital medicine elective for pre-clerkship students

    PubMed Central

    Connor, Denise M.; Conlon, Paul J.; O’Brien, Bridget C.; Chou, Calvin L.

    2017-01-01

    ABSTRACT Background: Medical students often struggle to apply their nascent clinical skills in clerkships. While transitional clerkships can orient students to new roles and logistics, students may benefit from developing clinical skills in inpatient environments earlier in their curriculum to improve readiness for clerkships. Intervention: Our four- to six-session elective provides pre-clerkship students with individualized learning in the inpatient setting with the aim of improving clerkship preparedness. Students work one-on-one with faculty who facilitate individualized learning through mentoring, deliberate practice, and directed feedback. Second-year medical students are placed on an attending-only, traditionally ‘non-teaching’ service in the hospital medicine division of a Veterans Affairs (VA) hospital for half-day sessions. Most students self-select into the elective following a class-wide advertisement. The elective also accepts students who are referred for remediation of their clinical skills. Outcome: In the elective’s first two years, 25 students participated and 47 students were waitlisted. We compared participant and waitlisted (non-participant) students’ self-efficacy in several clinical and professional domains during their first clerkship. Elective participants reported significantly higher clerkship preparedness compared to non-participants in the areas of physical exam, oral presentation, and formulation of assessments and plans. Conclusions: Students found the one-on-one feedback and personalized attention from attending physicians to be a particularly useful aspect of the course. This frequently cited benefit points to students’ perceived needs and the value they place on individualized feedback. Our innovation harnesses an untapped resource – the hospital medicine ‘non-teaching’ service – and serves as an attainable option for schools interested in enhancing early clinical skill-building for all students, including those recommended for remediation. Abbreviations: A&P: Assessment and plan; H&P: History and physical; ILP: Individual learning plan PMID:28395598

  3. UMTRA project water sampling and analysis plan, Durango, Colorado

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1994-01-01

    Surface remedial action has been completed at the Uranium Mill Tailings Remedial Action Project in Durango, Colorado. Contaminated soil and debris have been removed from the former processing site and placed in the Bodo Canyon disposal cell. Ground water at the former uranium mill/tailings site and raffinate pond area has been contaminated by the former milling operations. The ground water at the disposal site was not impacted by the former milling operations at the time of the cell`s construction. Activities for fiscal 1994 involve ground water sampling and site characterization of the disposal site.

  4. CENTRAL PLATEAU REMEDIATION

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    ROMINE, L.D.

    2006-02-01

    A systematic approach to closure planning is being implemented at the Hanford Site's Central Plateau to help achieve the goal of closure by the year 2035. The overall objective of Central Plateau remediation is to protect human health and the environment from the significant quantity of contaminated material that resulted from decades of plutonium production in support of the nation's defense. This goal will be achieved either by removing contaminants or placing the residual contaminated materials in a secure configuration that minimizes further migration to the groundwater and reduces the potential for inadvertent intrusion into contaminated sites. The approach tomore » Central Plateau cleanup used three key concepts--closure zones, closure elements, and closure process steps--to create an organized picture of actions required to complete remediation. These actions were merged with logic ties, constraints, and required resources to produce an integrated time-phased schedule and cost profile for Central Plateau closure. Programmatic risks associated with implementation of Central Plateau closure were identified and analyzed. Actions to mitigate the most significant risks are underway while high priority remediation projects continue to make progress.« less

  5. The application of petroleum hydrocarbon fingerprint characterization in site investigation and remediation

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Zemo, D.A.; Bruya, J.E.; Graf, T.E.

    1995-07-01

    Tremendous resources have been and continue to be spent investigating and remediating petroleum hydrocarbon compounds (PHCs) in soil and ground water. Investigating and planning a remedial strategy for sites affected by PHCs is often a challenging task because of the complex chemical nature of the PHCs, the complex regulatory environment related to PHC cleanup, and the use of analytical methods that provide quantitation but not identification f PHCs. From a technical standpoint, the PHC impacting soil and/or ground water is frequently inadequately characterized, both in identification as well as in its general properties (solubility, toxicity). From a regulatory standpoint, promulgatedmore » or recommended total petroleum hydrocarbon (TPH) cleanup levels generally relate to assumed properties of specific unweathered products and are inconsistent among different agencies and regions. Accurately identifying the PHC and its nature, a process known as fingerprint characterization, is critical to the determination of appropriate regulatory goals and design of cost-effective remedial approaches. This paper presents several case studies in which fingerprint characterization made a significant difference in the project outcome.« less

  6. Rules of thumb for superfund remedy selection

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1997-08-01

    The guidance document describes key principles and expectations, interspersed with `best practices` based on program experience, that should be consulted during the Superfund remedy selection process. These remedy selection `Rules of Thumb` are organized into three major policy areas: (1) risk assessment and risk management, (2) developing remedial alternatives, and (3) ground-water response actions. The purpose of this guide is to briefly summarize key elements of various remedy selection guidance documents and policies in one publication.

  7. STABILIZATION/SOLIDIFICATION OF CERCLA AND RCRA WASTES

    EPA Science Inventory

    This Handbook provides U.S. EPA regional staff responsible for reviewing CERCLA remedial action plans and RCRA permit applications with a tool for interpreting information on stabilization/solidification treatment. As a practical day-to-day reference guide, it will also provide t...

  8. AN OVERVIEW OF TOXICANT IDENTIFICATION IN SEDIMENTS AND DREDGED MATERIALS

    EPA Science Inventory

    The identification of toxicants affecting aquatic benthic systems is critical to sound assessment and management of our nation?s waterways. Identification of toxicants can be useful in designing effective sediment remediation plans and reasonable options for sediment disposal. K...

  9. Rapid Semi-Quantitative Mapping of Dispersed Caffeine Using an Autosampler/DART/TOFMS

    EPA Science Inventory

    Introduction: Rapid mapping of contaminant distributions is necessary to assess exposure risksand to plan remediation, when chemicals are dispersed accidentally, deliberately, or by weather-related events. Described previously (Grange, Environ. Forensics, 9, 125-141) were anaut...

  10. Operational Energy Strategy: Implementation Plan

    DTIC Science & Technology

    2012-03-01

    U.S. forces to obtain the energy required to perform their missions. To achieve this goal, the Department will identify and remediate energy-related...construction projects related to hydropower and biogas to build local capacity in Afghanistan. Responsibilities. The Joint Staff and Military

  11. 40 CFR 300.4 - Abbreviations.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Substances and Disease Registry CDC—Centers for Disease Control DOC—Department of Commerce DOD—Department of... Response Advisory Team DRG—District Response Group ERT—Environmental Response Team ESF—Emergency Support... Action RCP—Regional Contingency Plan RD—Remedial Design RERT—Radiological Emergency Response Team RI...

  12. Environmental Problems Associated With Decommissioning The Chernobyl Nuclear Power Plant Cooling Pond

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Farfan, E. B.; Jannik, G. T.; Marra, J. C.

    2009-11-09

    Decommissioning of nuclear power plants and other nuclear fuel cycle facilities has been an imperative issue lately. There exist significant experience and generally accepted recommendations on remediation of lands with residual radioactive contamination; however, there are hardly any such recommendations on remediation of cooling ponds that, in most cases, are fairly large water reservoirs. The literature only describes remediation of minor reservoirs containing radioactive silt (a complete closure followed by preservation) or small water reservoirs resulting in reestablishing natural water flows. Problems associated with remediation of river reservoirs resulting in flooding of vast agricultural areas also have been described. Inmore » addition, the severity of environmental and economic problems related to the remedial activities is shown to exceed any potential benefits of these activities. One of the large, highly contaminated water reservoirs that require either remediation or closure is Karachay Lake near the MAYAK Production Association in the Chelyabinsk Region of Russia where liquid radioactive waste had been deep well injected for a long period of time. Backfilling of Karachay Lake is currently in progress. It should be noted that secondary environmental problems associated with its closure are considered to be of less importance since sustaining Karachay Lake would have presented a much higher radiological risk. Another well-known highly contaminated water reservoir is the Chernobyl Nuclear Power Plant (ChNPP) Cooling Pond, decommissioning of which is planned for the near future. This study summarizes the environmental problems associated with the ChNPP Cooling Pond decommissioning.« less

  13. ENVIRONMENTAL PROBLEMS ASSOCIATED WITH DECOMMISSIONING THE CHERNOBYL NUCLEAR POWER PLANT COOLING POND

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Farfan, E.

    2009-09-30

    Decommissioning of nuclear power plants and other nuclear fuel cycle facilities has been an imperative issue lately. There exist significant experience and generally accepted recommendations on remediation of lands with residual radioactive contamination; however, there are hardly any such recommendations on remediation of cooling ponds that, in most cases, are fairly large water reservoirs. The literature only describes remediation of minor reservoirs containing radioactive silt (a complete closure followed by preservation) or small water reservoirs resulting in reestablishing natural water flows. Problems associated with remediation of river reservoirs resulting in flooding of vast agricultural areas also have been described. Inmore » addition, the severity of environmental and economic problems related to the remedial activities is shown to exceed any potential benefits of these activities. One of the large, highly contaminated water reservoirs that require either remediation or closure is Karachay Lake near the MAYAK Production Association in the Chelyabinsk Region of Russia where liquid radioactive waste had been deep well injected for a long period of time. Backfilling of Karachay Lake is currently in progress. It should be noted that secondary environmental problems associated with its closure are considered to be of less importance since sustaining Karachay Lake would have presented a much higher radiological risk. Another well-known highly contaminated water reservoir is the Chernobyl Nuclear Power Plant (ChNPP) Cooling Pond, decommissioning of which is planned for the near future. This study summarizes the environmental problems associated with the ChNPP Cooling Pond decommissioning.« less

  14. CENTRAL PLATEAU REMEDIATION OPTIMIZATION STUDY

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    BERGMAN, T. B.; STEFANSKI, L. D.; SEELEY, P. N.

    2012-09-19

    THE CENTRAL PLATEAU REMEDIATION OPTIMIZATION STUDY WAS CONDUCTED TO DEVELOP AN OPTIMAL SEQUENCE OF REMEDIATION ACTIVITIES IMPLEMENTING THE CERCLA DECISION ON THE CENTRAL PLATEAU. THE STUDY DEFINES A SEQUENCE OF ACTIVITIES THAT RESULT IN AN EFFECTIVE USE OF RESOURCES FROM A STRATEGIC PERSPECTIVE WHEN CONSIDERING EQUIPMENT PROCUREMENT AND STAGING, WORKFORCE MOBILIZATION/DEMOBILIZATION, WORKFORCE LEVELING, WORKFORCE SKILL-MIX, AND OTHER REMEDIATION/DISPOSITION PROJECT EXECUTION PARAMETERS.

  15. To fail is human: remediating remediation in medical education.

    PubMed

    Kalet, Adina; Chou, Calvin L; Ellaway, Rachel H

    2017-12-01

    Remediating failing medical learners has traditionally been a craft activity responding to individual learner and remediator circumstances. Although there have been moves towards more systematic approaches to remediation (at least at the institutional level), these changes have tended to focus on due process and defensibility rather than on educational principles. As remediation practice evolves, there is a growing need for common theoretical and systems-based perspectives to guide this work. This paper steps back from the practicalities of remediation practice to take a critical systems perspective on remediation in contemporary medical education. In doing so, the authors acknowledge the complex interactions between institutional, professional, and societal forces that are both facilitators of and barriers to effective remediation practices. The authors propose a model that situates remediation within the contexts of society as a whole, the medical profession, and medical education institutions. They also outline a number of recommendations to constructively align remediation principles and practices, support a continuum of remediation practices, destigmatize remediation, and develop institutional communities of practice in remediation. Medical educators must embrace a responsible and accountable systems-level approach to remediation if they are to meet their obligations to provide a safe and effective physician workforce.

  16. Seemingly unrelated intervention time series models for effectiveness evaluation of large scale environmental remediation.

    PubMed

    Ip, Ryan H L; Li, W K; Leung, Kenneth M Y

    2013-09-15

    Large scale environmental remediation projects applied to sea water always involve large amount of capital investments. Rigorous effectiveness evaluations of such projects are, therefore, necessary and essential for policy review and future planning. This study aims at investigating effectiveness of environmental remediation using three different Seemingly Unrelated Regression (SUR) time series models with intervention effects, including Model (1) assuming no correlation within and across variables, Model (2) assuming no correlation across variable but allowing correlations within variable across different sites, and Model (3) allowing all possible correlations among variables (i.e., an unrestricted model). The results suggested that the unrestricted SUR model is the most reliable one, consistently having smallest variations of the estimated model parameters. We discussed our results with reference to marine water quality management in Hong Kong while bringing managerial issues into consideration. Copyright © 2013 Elsevier Ltd. All rights reserved.

  17. Building dismantlement and site remediation at the Apollo Fuel Plant: When is technology the answer?

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Walton, L.

    1995-01-01

    The Apollo fuel plant was located in Pennsylvania on a site known to have been used continuously for stell production from before the Civil War until after World War II. Then the site became a nuclear fuel chemical processing plants. Finally it was used to convert uranium hexafluoride to various oxide fuel forms. After the fuel manufacturing operations were teminated, the processing equipment was partially decontaminated, removed, packaged and shipped to a licensed low-level radioactive waste burial site. The work was completed in 1984. In 1990 a detailed site characterization was initiated to establishe the extent of contamination and tomore » plan the building dismantlement and soil remediation efforts. This article discusses the site characterization and remedial action at the site in the following subsections: characterization; criticality control; mobile containment; soil washing; in-process measurements; and the final outcome of the project.« less

  18. The health care Titanic: women and children first?

    PubMed

    Holland, S; Peterson, K

    1993-01-01

    The plight of people who lack access to health care has captured national attention and led to a number of proposals to remedy the problem. The authors look at three types of proposals being advanced--"pro-competition" plans, "pay-or-play" plans, and a national health care system--and find that they fail to address adequately the pressing needs of two groups of the poor: women of childbearing age and elderly women.

  19. Comment and response document for the long-term surveillance plan for the Bodo Canyon Disposal Site, Durango, Colorado, Revision 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1995-11-01

    This report contains the comment and response document for the Draft Long-Term Surveillance Plan of the Bodo Canyon Site in Durango, California. This is a part of the Uranium Mill Tailings Remedial Action (UMTRA) Project. Questions and comments regarding specific sections or statements in the report are described and then a response to each review comment or question is provided.

  20. Ground-water flow in the Prairie du Chien-Jordan aquifer related to contamination by coal-tar derivatives, St. Louis Park, Minnesota

    USGS Publications Warehouse

    Stark, J.R.; Hult, M.F.

    1985-01-01

    Simulation of a proposed gradient-control plan, in which lateral homogeneity and isotropy of individual hydro geologic units was assumed, indicates that the actions would be effective in limiting expansion of the contaminated volume in the Prairie du Chien-Jordan aquifer. The plan includes the control of withdrawal from five wells. The simulations also show, however, that modelcalculated potentiometric surfaces are sensitive to changes in withdrawal rates at wells not intended to be under the control of the plan. Management of discharge from these wells also will be important to overall effectiveness of the remedial-action plan.

  1. Fiscal Year 2008 Phased Construction Completion Report for EU Z2-33 in Zone 2, East Tennessee Technology Park, Oak Ridge, Tennessee

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bechtel Jacobs

    The Record of Decision for Soil, Buried Waste, and Subsurface Structure Actions in Zone 2, East Tennessee Technology Park, Oak Ridge, Tennessee (DOE/OR/01-2161&D2) (Zone 2 ROD) acknowledged that most of the 800 acres in Zone 2 were contaminated, but that sufficient data to confirm the levels of contamination were lacking. The Zone 2 ROD further specified that a sampling strategy for filling the data gaps would be developed. The Remedial Design Report/Remedial Action Work Plan for Zone 2 Soils, Slabs, and Subsurface Structures, East Tennessee Technology Park, Oak Ridge, Tennessee (DOE/OR/01-2224&D3) (Zone 2 RDR/RAWP) defined the sampling strategy as themore » Dynamic Verification Strategy (DVS), generally following the approach used for characterization of the Zone 1 exposure units (EUs). The Zone 2 ROD divided the Zone 2 area into seven geographic areas and 44 EUs. To facilitate the data quality objectives (DQOs) of the DVS process, the Zone 2 RDR/RAWP regrouped the 44 EUs into 12 DQO scoping EU groups. These groups facilitated the DQO process by placing similar facilities and their support facilities together and allowing identification of data gaps. The EU groups were no longer pertinent after DQO planning was completed and characterization was conducted as areas became accessible. As the opportunity to complete characterization became available, the planned DVS program and remedial actions (RAs) were completed for EU Z2-33. Remedial action was also performed at two additional areas in adjacent EU Z2-42 because of their close proximity and similar nature to a small surface soil RA in EU Z2-33. Remedial actions for building slabs performed in EU Z2-33 during fiscal year (FY) 2007 were reported in the Fiscal Year 2007 Phased Construction Completion Report for the Zone 2 Soils, Slabs, and Subsurface Structures at East Tennessee Technology Park, Oak Ridge, Tennessee (DOE/OR/01-2723&D1). Recommended RAs for EU Z2-42 were described in the Fiscal Year 2006 Phased Construction Completion Report for the Zone 2 Soils, Slabs, and Subsurface Structures at East Tennessee Technology Park, Oak Ridge, Tennessee (DOE/OR/01-2317&D2). Remedial actions performed in the Balance of Site (BOS) Laboratory Area of EU Z2-33 and two small areas in EU Z2-42 are described in Sects. 5 through 10 of this Phased Construction Completion Report (PCCR). The purpose of this PCCR is to address the following: (1) Document DVS characterization results for EU Z2-33; (2) Describe and document the risk evaluation and determine if the EU meets the Zone 2 ROD requirements for unrestricted industrial use to 10 ft bgs; (3) Identify additional areas not defined in the Zone 2 ROD that require remediation based on the DVS evaluation results; and (4) Describe RAs performed in the EU Z2-33 BOS Laboratory Area and two small areas in EU Z2-42. Approximately 18 acres in EU Z2-33 are addressed in this PCCR. Based on the results of the DVS evaluation and RAs performed, all 18 acres are recommended for unrestricted industrial use to 10 ft bgs. Three Federal Facility Agreement sites are addressed and recommended for no further action within this acreage, including: (1) K-1004-L Recirculating Cooling Water Lines Leak Sites; (2) K-1044 Heavy Equipment Repair Shop; and (3) K-1015-A Laundry Pit. Remedial actions for EU Z2-33 were developed in response to DVS characterization results described in the EU Z2-33 Technical Memorandum (Appendix A) and to support reindustrialization of the East Tennessee Technology Park as a commercial industrial park. Remediation criteria were designed for the protection of a future industrial worker who normally would not have the potential for exposure to soil below 10ft bgs. Accordingly, the Zone 2 ROD required land use controls to prevent disturbance of soils below 10 ft deep and to restrict future land use to industrial/commercial activities. In response to stakeholder comments, the U.S. Department of Energy agreed to re-evaluate the need for such land use restrictions. This document includes a screening evaluation to determine the likelihood of land use controls in EU Z2-33 being modified to: (1) eliminate the restriction on disturbance of soils below 10 ft bgs where data indicate the absence of residual contamination at any depth that would result in an unacceptable risk to the future industrial worker, and (2) permit alternative land uses that would be protective of future site occupants. Results of this screening evaluation indicate a low probability that restrictions on disturbing soil below 10 ft bgs could be safely eliminated for EU Z2-33. A qualitative screening evaluation considered the likelihood of unrestricted land use being protective of future site occupants. Based on this qualitative assessment, all 18 acres addressed in this PCCR were assigned a low probability for consideration of release for unrestricted land use.« less

  2. Remedial actions at the former Climax Uranium Company, Uranium Mill site, Grand Junction, Mesa County, Colorado. Volume 1, Text: Final environmental impact statement

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    1986-12-01

    This statement evaluates and compares the environmental impacts associated with the remedial actions of the residual radioactive materials remaining at the inactive uranium processing site and associated vicinity properties at Grand Junction, Mesa County, Colorado. This statement is also intended to aid the BLM in amending their management framework plans and final resource management plan, as well as assisting in compliance with the withdrawal application as appropriate. The site is a 114-acre tract of private and state owned land which contains approximately 3.1 million cubic yards of tailings and associated contaminated soils. The vicinity properties are homes, businesses, public buildings,more » and vacant lots which may have been contaminated during construction by the use of tailings as building material. An estimated 3465 vicinity properties would be cleaned up during remedial action of the tailings pile. The tailings were produced by the former Climax Uranium Company which processed uranium ore, which it sold to the US Atomic Energy Commission from 1951 to 1966 and to private sources from 1966 to 1970. This statement evaluates six alternatives for stabilization and disposal of the tailings and other contaminated materials: (1) No action. (2) Stabilization at the Grand Junction site. (3) Disposal at the Cheney Reservoir site with truck transport. (4) Disposal at the Cheney Reservoir site with train and truck transport. (5) Disposal at the Two Road site with truck transport. (6) Disposal at the Two Road site with train and truck transport. All of the alternatives except no action include remedial action at an estimated 3465 vicinity properties. Alternative 3 is DOE`s preferred alternative.« less

  3. Remediation Evaluation Model for Chlorinated Solvents (REMChlor)

    EPA Science Inventory

    A new analytical solution has been developed for simulating the transient effects of groundwater source and plume remediation. This development was performed as part of a Strategic Environmental Research and Development Program (SERDP) research project, which was a joint effort ...

  4. BIOVENTING DEVELOPMENT PROGRAM (TREATMENT AND DESTRUCTION BRANCH, LRPCD, NRMRL)

    EPA Science Inventory

    In a continuing effort to develop environment-friendly and cost-effective remediation technologies, the Land Remediation and Pollution Control Division (LRPCD) conducts an aggressive research and development program in bioventing. LRPCD's bioventing program is multi-faceted, with...

  5. The Department of Energy`s Remedial Action Assessment System (RAAS): Decision support tools for performing streamlined feasibility studies

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    White, M.K.

    1994-06-01

    The United States Department of Energy (DOE) faces the major task of cleaning up hundreds of waste sites across the nation, which will require completion of a large number of remedial investigation/feasibility studies (RI/FSs). The intent of each RI/FS is to characterize the waste problems and environmental conditions at the operable unit level, segment the remediation problem into manageable medium-specific and contaminant-specific pieces, define corresponding remediation objectives, and identify remedial response actions to satisfy those objectives. The RI/FS team can then identify combinations of remediation technologies that will meet the remediation objectives. Finally, the team must evaluate these remedial alternativesmore » in terms of effectiveness, implementability, cost, and acceptability. The Remedial Action Assessment System (RAAS) is being developed by Pacific Northwest Laboratory (PNL) to support DOE in this effort.« less

  6. What is the Prevalence and Success of Remediation of Emergency Medicine Residents?

    PubMed Central

    Silverberg, Mark; Weizberg, Moshe; Murano, Tiffany; Smith, Jessica L.; Burkhardt, John C.; Santen, Sally A.

    2015-01-01

    Introduction The primary objective of this study was to determine the prevalence of remediation, competency domains for remediation, the length, and success rates of remediation in emergency medicine (EM). Methods We developed the survey in Surveymonkey™ with attention to content and response process validity. EM program directors responded how many residents had been placed on remediation in the last three years. Details regarding the remediation were collected including indication, length and success. We reported descriptive data and estimated a multinomial logistic regression model. Results We obtained 126/158 responses (79.7%). Ninety percent of programs had at least one resident on remediation in the last three years. The prevalence of remediation was 4.4%. Indications for remediation ranged from difficulties with one core competency to all six competencies (mean 1.9). The most common were medical knowledge (MK) (63.1% of residents), patient care (46.6%) and professionalism (31.5%). Mean length of remediation was eight months (range 1–36 months). Successful remediation was 59.9% of remediated residents; 31.3% reported ongoing remediation. In 8.7%, remediation was deemed “unsuccessful.” Training year at time of identification for remediation (post-graduate year [PGY] 1), longer time spent in remediation, and concerns with practice-based learning (PBLI) and professionalism were found to have statistically significant association with unsuccessful remediation. Conclusion Remediation in EM residencies is common, with the most common areas being MK and patient care. The majority of residents are successfully remediated. PGY level, length of time spent in remediation, and the remediation of the competencies of PBLI and professionalism were associated with unsuccessful remediation. PMID:26594275

  7. Ready to Renovate

    ERIC Educational Resources Information Center

    Kennedy, Mike

    2008-01-01

    Schools and universities should have a thorough plan that sets priorities for the most pressing facility renovations. With remedial programs, enrichment offerings, recreational activities and extended-year schedules, many school facilities are no longer dormant in the summer months. The increased year-round use of education facilities benefits…

  8. Enhanced Estimation of Terrestrial Loadings for TMDLs: Normalization Approach

    USDA-ARS?s Scientific Manuscript database

    TMDL implementation plans to remediate pathogen-impaired streams are usually based on deterministic terrestrial fate and transport (DTFT) models. A novel protocol is proposed that can effectively, efficiently, and explicitly capture the predictive uncertainty of DTFT models used to establish terres...

  9. Test/QA Plan for Verification of Nitrate Sensors for Groundwater Remediation Monitoring

    EPA Science Inventory

    A submersible nitrate sensor is capable of collecting in-situ measurements of dissolved nitrate concentrations in groundwater. Although several types of nitrate sensors currently exist, this verification test will focus on submersible sensors equipped with a nitrate-specific ion...

  10. Remediation techniques for heavy metal-contaminated soils: Principles and applicability.

    PubMed

    Liu, Lianwen; Li, Wei; Song, Weiping; Guo, Mingxin

    2018-08-15

    Globally there are over 20millionha of land contaminated by the heavy metal(loid)s As, Cd, Cr, Hg, Pb, Co, Cu, Ni, Zn, and Se, with the present soil concentrations higher than the geo-baseline or regulatory levels. In-situ and ex-situ remediation techniques have been developed to rectify the heavy metal-contaminated sites, including surface capping, encapsulation, landfilling, soil flushing, soil washing, electrokinetic extraction, stabilization, solidification, vitrification, phytoremediation, and bioremediation. These remediation techniques employ containment, extraction/removal, and immobilization mechanisms to reduce the contamination effects through physical, chemical, biological, electrical, and thermal remedy processes. These techniques demonstrate specific advantages, disadvantages, and applicability. In general, in-situ soil remediation is more cost-effective than ex-situ treatment, and contaminant removal/extraction is more favorable than immobilization and containment. Among the available soil remediation techniques, electrokinetic extraction, chemical stabilization, and phytoremediation are at the development stage, while the others have been practiced at full, field scales. Comprehensive assessment indicates that chemical stabilization serves as a temporary soil remediation technique, phytoremediation needs improvement in efficiency, surface capping and landfilling are applicable to small, serious-contamination sites, while solidification and vitrification are the last remediation option. The cost and duration of soil remediation are technique-dependent and site-specific, up to $500ton -1 soil (or $1500m -3 soil or $100m -2 land) and 15years. Treatability studies are crucial to selecting feasible techniques for a soil remediation project, with considerations of the type and degree of contamination, remediation goals, site characteristics, cost effectiveness, implementation time, and public acceptability. Copyright © 2018 Elsevier B.V. All rights reserved.

  11. 2015 Site Environmental Report Fernald Preserve

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hertel, Bill; Hooten, Gwen

    The Fernald Preserve 2015 Site Environmental Report provides stakeholders with the results from the Fernald, Ohio, Site’s environmental monitoring programs for 2015; a summary of the U.S. Department of Energy’s (DOE’s) activities conducted onsite; and a summary of the Fernald Preserve’s compliance with the various environmental regulations, compliance agreements, and DOE policies that govern site activities. This report has been prepared in accordance with the “Integrated Environmental Monitoring Plan,” which is Attachment D of the Comprehensive Legacy Management and Institutional Controls Plan (LMICP) (DOE 2016). Remediation of the Fernald Preserve has been successfully completed with the exception of the groundwater.more » During 2015, activities at the Fernald Preserve included: environmental monitoring activities related to direct radiation, groundwater, and surface water; ecological restoration monitoring and maintenance as well as inspections, care, and monitoring of the site and the OSDF to ensure that provisions of the LMICP are fully implemented; OSDF leak detection monitoring and collection, monitoring, and treatment of leachate from the OSDF; extraction, monitoring, and treatment of contaminated groundwater from the Great Miami Aquifer (Operable Unit 5); ongoing operation of the Fernald Preserve Visitors Center, associated outreach, and educational activities; and monitoring as specified in the site’s National Pollutant Discharge Elimination System (NPDES) permit. Environmental monitoring programs were developed to ensure that the remedy remains protective of the environment. The requirements of these programs are described in detail in the LMICP and reported in this Site Environmental Report.« less

  12. Nuclear facility decommissioning and site remedial actions: A selected bibliography, Volume 18. Part 1B: Citations with abstracts, sections 10 through 16

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1997-09-01

    This bibliography contains 3,638 citations with abstracts of documents relevant to environmental restoration, nuclear facility decontamination and decommissioning (D and D), uranium mill tailings management, and site remedial actions. The bibliography contains scientific, technical, financial, and regulatory information that pertains to DOE environmental restoration programs. The citations are separated by topic into 16 sections, including (1) DOE Environmental Restoration Program; (2) DOE D and D Program; (3) Nuclear Facilities Decommissioning; (4) DOE Formerly Utilized sites Remedial Action Program; (5) NORM-Contaminated Site Restoration; (6) DOE Uranium Mill Tailings Remedial Action Project; (7) Uranium Mill Tailings Management; (8) DOE Site-Wide Remedial Actions;more » (9) DOE Onsite Remedial Action Projects; (10) Contaminated Site Remedial Actions; (11) DOE Underground Storage Tank Remediation; (12) DOE Technology Development, Demonstration, and Evaluation; (13) Soil Remediation; (14) Groundwater Remediation; (15) Environmental Measurements, Analysis, and Decision-Making; and (16) Environmental Management Issues.« less

  13. Assessing sustainable remediation frameworks using sustainability principles.

    PubMed

    Ridsdale, D Reanne; Noble, Bram F

    2016-12-15

    The remediation industry has grown exponentially in recent decades. International organizations of practitioners and remediation experts have developed several frameworks for integrating sustainability into remediation projects; however, there has been limited attention to how sustainability is approached and operationalized in sustainable remediation frameworks and practices - or whether sustainability plays any meaningful role at all in sustainable remediation. This paper examines how sustainability is represented in remediation frameworks and the guidance provided for practical application. Seven broad sustainability principles and review criteria are proposed and applied to a sample of six international remediation frameworks. Not all review criteria were equally satisfied and none of the frameworks fully met all criteria; however, the best performing frameworks were those identified as sustainability remediation frameworks. Intra-generational equity was addressed by all frameworks. Integrating social, economic and biophysical components beyond triple-bottom-line indicators was explicitly addressed only by the sustainable remediation frameworks. No frameworks provided principle- or rule-based guidance for dealing with trade-offs in sustainability decisions. Copyright © 2016 Elsevier Ltd. All rights reserved.

  14. Tank waste remediation system multi-year work plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    The Tank Waste Remediation System (TWRS) Multi-Year Work Plan (MYWP) documents the detailed total Program baseline and was constructed to guide Program execution. The TWRS MYWP is one of two elements that comprise the TWRS Program Management Plan. The TWRS MYWP fulfills the Hanford Site Management System requirement for a Multi-Year Program Plan and a Fiscal-Year Work Plan. The MYWP addresses program vision, mission, objectives, strategy, functions and requirements, risks, decisions, assumptions, constraints, structure, logic, schedule, resource requirements, and waste generation and disposition. Sections 1 through 6, Section 8, and the appendixes provide program-wide information. Section 7 includes a subsectionmore » for each of the nine program elements that comprise the TWRS Program. The foundation of any program baseline is base planning data (e.g., defendable product definition, logic, schedules, cost estimates, and bases of estimates). The TWRS Program continues to improve base data. As data improve, so will program element planning, integration between program elements, integration outside of the TWRS Program, and the overall quality of the TWRS MYWP. The MYWP establishes the TWRS baseline objectives to store, treat, and immobilize highly radioactive Hanford waste in an environmentally sound, safe, and cost-effective manner. The TWRS Program will complete the baseline mission in 2040 and will incur costs totalling approximately 40 billion dollars. The summary strategy is to meet the above objectives by using a robust systems engineering effort, placing the highest possible priority on safety and environmental protection; encouraging {open_quotes}out sourcing{close_quotes} of the work to the extent practical; and managing significant but limited resources to move toward final disposition of tank wastes, while openly communicating with all interested stakeholders.« less

  15. Tank waste remediation system multi-year work plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1994-09-01

    The Tank Waste Remediation System (TWRS) Multi-Year Work Plan (MYWP) documents the detailed total Program baseline and was constructed to guide Program execution. The TWRS MYWP is one of two elements that comprise the TWRS Program Management Plan. The TWRS MYWP fulfills the Hanford Site Management System requirement for a Multi-Year Program Plan and a Fiscal-Year Work Plan. The MYWP addresses program vision, mission, objectives, strategy, functions and requirements, risks, decisions, assumptions, constraints, structure, logic, schedule, resource requirements, and waste generation and disposition. Sections 1 through 6, Section 8, and the appendixes provide program-wide information. Section 7 includes a subsectionmore » for each of the nine program elements that comprise the TWRS Program. The foundation of any program baseline is base planning data (e.g., defendable product definition, logic, schedules, cost estimates, and bases of estimates). The TWRS Program continues to improve base data. As data improve, so will program element planning, integration between program elements, integration outside of the TWRS Program, and the overall quality of the TWRS MYWP. The MYWP establishes the TWRS baseline objectives to store, treat, and immobilize highly radioactive Hanford waste in an environmentally sound, safe, and cost-effective manner. The TWRS Program will complete the baseline mission in 2040 and will incur costs totalling approximately 40 billion dollars. The summary strategy is to meet the above objectives by using a robust systems engineering effort, placing the highest possible priority on safety and environmental protection; encouraging {open_quotes}out sourcing{close_quotes} of the work to the extent practical; and managing significant but limited resources to move toward final disposition of tank wastes, while openly communicating with all interested stakeholders.« less

  16. Developing ecologically based PCB, pesticide, and metal remedial goals for an impacted northeast wooded swamp

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Rury, P.M.; Turton, D.J.

    Historically, remedial goals at hazardous waste sites have been developed based on human health risk estimates. As the disciplines of remedial investigation, risk assessment, and remedial design have evolved, there has been a shift toward the development of remedial goals that are protective of both human health and the environment. This has increased the need for sound quantitative ecological risk methodologies from which to derive ecologically protective remedial goals. The foundation of many ecological risk assessment models is the bioconcentration or bioaccumulation factor that estimates the partitioning of the compound of concern between the media (e.g., water, soil, or food)more » and the organism. Simple dietary food-chain models are then used to estimate the dose and resulting risk to higher trophic levels. For a Superfund site that encompassed a northeastern wooded swamp, a PCB pesticide and metal uptake and toxicity study was conducted on the earthworm commonly known as the red wiggler (Eisenea foetida). The study resulted in site-specific sediment to earthworm bioconcentration factors for PCBs and a range of pesticides and metals. In addition, largemouth bass and yellow perch were collected from an impacted pond to identify PCB and pesticide concentrations in mink (Mustela vison) prey. Utilizing the empirical data and site-specific bioconcentration factors in food-chain models, potential risks to the American woodcock (Scolopax minor) and mink were assessed, and ecologically protective PCB, pesticide, and metal remedial goals for the sediments of the wooded swamp were developed.« less

  17. Early decision framework for integrating sustainable risk management for complex remediation sites: Drivers, barriers, and performance metrics.

    PubMed

    Harclerode, Melissa A; Macbeth, Tamzen W; Miller, Michael E; Gurr, Christopher J; Myers, Teri S

    2016-12-15

    As the environmental remediation industry matures, remaining sites often have significant underlying technical challenges and financial constraints. More often than not, significant remediation efforts at these "complex" sites have not achieved stringent, promulgated cleanup goals. Decisions then have to be made about whether and how to commit additional resources towards achieving those goals, which are often not achievable nor required to protect receptors. Guidance on cleanup approaches focused on evaluating and managing site-specific conditions and risks, rather than uniformly meeting contaminant cleanup criteria in all media, is available to aid in this decision. Although these risk-based cleanup approaches, such as alternative endpoints and adaptive management strategies, have been developed, they are under-utilized due to environmental, socio-economic, and risk perception barriers. Also, these approaches are usually implemented late in the project life cycle after unsuccessful remedial attempts to achieve stringent cleanup criteria. In this article, we address these barriers by developing an early decision framework to identify if site characteristics support sustainable risk management, and develop performance metrics and tools to evaluate and implement successful risk-based cleanup approaches. In addition, we address uncertainty and risk perception challenges by aligning risk-based cleanup approaches with the concepts of risk management and sustainable remediation. This approach was developed in the context of lessons learned from implementing remediation at complex sites, but as a framework can, and should, be applied to all sites undergoing remediation. Copyright © 2016 Elsevier Ltd. All rights reserved.

  18. Remediation of the Highland Drive South Ravine, Port Hope, Ontario: Contaminated Groundwater Discharge Management Using Permeable Reactive Barriers and Contaminated Sediment Removal - 13447

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Smyth, David; Roos, Gillian; Ferguson Jones, Andrea

    2013-07-01

    The Highland Drive South Ravine (HDSR) is the discharge area for groundwater originating from the Highland Drive Landfill, the Pine Street North Extension (PSNE) roadbed parts of the Highland Drive roadbed and the PSNE Consolidation Site that contain historical low-level radioactive waste (LLRW). The contaminant plume from these LLRW sites contains elevated concentrations of uranium and arsenic and discharges with groundwater to shallow soils in a wet discharge area within the ravine, and directly to Hunt's Pond and Highland Drive South Creek, which are immediately to the south of the wet discharge area. Remediation and environmental management plans for HDSRmore » have been developed within the framework of the Port Hope Project and the Port Hope Area Initiative. The LLRW sites will be fully remediated by excavation and relocation to a new Long-Term Waste Management Facility (LTWMF) as part of the Port Hope Project. It is projected, however, that the groundwater contaminant plume between the remediated LLRW sites and HDSR will persist for several hundreds of years. At the HDSR, sediment remediation within Hunt's Ponds and Highland Drive South Creek, excavation of the existing and placement of clean fill will be undertaken to remove current accumulations of solid-phase uranium and arsenic associated with the upper 0.75 m of soil in the wet discharge area, and permeable reactive barriers (PRBs) will be used for in situ treatment of contaminated groundwater to prevent the ongoing discharge of uranium and arsenic to the area in HDSR where shallow soil excavation and replacement has been undertaken. Bench-scale testing using groundwater from HDSR has confirmed excellent treatment characteristics for both uranium and arsenic using permeable reactive mixtures containing granular zero-valent iron (ZVI). A sequence of three PRBs containing ZVI and sand in backfilled trenches has been designed to intercept the groundwater flow system prior to its discharge to the ground surface and the creek and ponds in the HDSR. The first of the PRBs will be installed immediately up-gradient of the wet discharge area approximately 50 m from the creek, the other two will be installed across the area of shallow soil replacement, and all will extend from ground surface to the base of the water table aquifer through which the impacted groundwater flows. The PRBs have been designed to provide the removal of uranium and arsenic for decades, although the capacity of the treatment mixture for contaminant removal suggests that a longer period of treatment may be feasible. The environmental management plan includes an allowance for on-going monitoring, and replacement of a PRB(s) as might be required. (authors)« less

  19. Hanford Site Groundwater Protection Management Program: Revision 1

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    Groundwater protection is a national priority that is promulgated in a variety of environmental regulations at local, state, and federal levels. To effectively coordinate and ensure compliance with applicable regulations, the US Department of Energy has issued DOE Order 5400.1 (now under revision) that requires all US Department of Energy facilities to prepare separate groundwater protection program descriptions and plans. This document describes the Groundwater Protection Management Program for the Hanford Site located in the state of Washington. DOE Order 5400.1 specifies that the Groundwater Protection Management Program cover the following general topical areas: (1) documentation of the groundwater regime,more » (2) design and implementation of a groundwater monitoring program to support resource management and comply with applicable laws and regulations, (3) a management program for groundwater protection and remediation, (4) a summary and identification of areas that may be contaminated with hazardous waste, (5) strategies for controlling these sources, (6) a remedial action program, and (7) decontamination and decommissioning and related remedial action requirements. Many of the above elements are covered by existing programs at the Hanford Site; thus, one of the primary purposes of this document is to provide a framework for coordination of existing groundwater protection activities. Additionally, it describes how information needs are identified and can be incorporated into existing or proposed new programs. The Groundwater Protection Management Program provides the general scope, philosophy, and strategies for groundwater protection/management at the Hanford Site. Subtier documents provide the detailed plans for implementing groundwater-related activities and programs. Related schedule and budget information are provided in the 5-year plan for environmental restoration and waste management at the Hanford Site.« less

  20. Project Work Plan 100-N Area Strontium-90 Treatability Demonstration Project: Phytoremediation Along the 100-N Columbia River Riparian Zone

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ainsworth, Calvin C.

    The 100-N Area Innovative Treatment and Remediation Demonstration (ITRD) identified phyto¬remediation as a potential technology both for the removal of 90Sr from the soil of the riparian zone and as a filter for groundwater along the Columbia River. Recent greenhouse and growth chamber studies have demonstrated the viability of phytoextraction to remove 90Sr from this area’s soil/water; in conjunction with monitored natural attenuation and an apatite barrier the process would make an effective treatment for remediation of the 100-N Area 90Sr plume. All activities associated with the 100-NR-1 and 100-NR-2 Operable Units of the Hanford 100-N Area have had, andmore » continue to have, significant regulatory and stakeholder participation. Beginning in 1998 with the ITRD process, presentations to the ITRD TAG were heavily attended by EPA, Washington State Department of Ecology, and stakeholders. In addition, three workshops have been held to receive regulatory and stakeholder feedback on monitored natural attenuation, the apatite barrier, and phytoremediation; these were held in Richland in August 2003, December 2004, and August 2005. The apatite injection treatability test plan (DOE 2005) describes phytoremediation as a technology to be evaluated during the March 2008 evaluation milestone as described in the Tri-Party Agreement change request (M-16-06-01 Change Control Form). If, during this evaluation milestone, phytoremediation is favorably evaluated it would be incorporated into the treatability test plan. The phytoremediation treatability test described in this proposal is strongly supported by the Washington State Department of Ecology.« less

  1. Washing and caustic leaching of Hanford tank sludges: results of FY 1996 studies. Revision

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lumetta, G.J.; Rapko, B.M.; Wagner, M.J.

    During the past few years, the primary mission at the US Department of Energy`s Hanford Site has changed from producing plutonium to restoring the environment. Large volumes of high-level radioactive wastes (HLW), generated during past Pu production and other operations, are stored in underground tanks on site. The current plan for remediating the Hanford tank farms consists of waste retrieval, pretreatment, treatment (immobilization), and disposal. The HLW will be immobilized in a borosilicate glass matrix and then disposed of in a geologic repository. Because of the expected high cost of HLW vitrification and geologic disposal, pretreatment processes will be implementedmore » to reduce the volume of borosilicate glass produced in disposing of the tank wastes. On this basis, a pretreatment plan is being developed. This report describes the sludge washing and caustic leaching test conducted to create a Hanford tank sludge pretreatment flowsheet.« less

  2. TECHNOLOGY INTEGRATION FOR CONTAMINATED SITE REMEDIATION: CLEANUP GOALS & PERFORMANCE CRITERIA

    EPA Science Inventory

    There is a need to develop and field-test integrated remediation technologies that operate in a synergistic manner for cost-effective treatment of contaminated sites to achieve risk-based and rational endpoints. Aggressive technologies designed for rapid source-zone remediation m...

  3. FEASIBILITY OF ELECTROKINETIC SOIL REMEDIATION IN HORIZONTAL LASAGNA CELLS

    EPA Science Inventory

    An integrated soil remediation technology called Lasagna has been developed that combines electrokinetics with treatment zones for use in low permeability soils where the rates of hydraulic and electrokinetic transport are too low to be useful for remediation of contaminants. The...

  4. Uranium Mill Tailings Remedial Action Project Safety Advancement Field Effort (SAFE) Program

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1994-02-01

    In 1992, the Uranium Mill Tailings Remedial Action (UMTRA) Project experienced several health and safety related incidents at active remediation project sites. As a result, the U.S. Department of Energy (DOE) directed the Technical Assistance Contractor (TAC) to establish a program increasing the DOE`s overall presence at operational remediation sites to identify and minimize risks in operations to the fullest extent possible (Attachments A and B). In response, the TAC, in cooperation with the DOE and the Remedial Action Contractor (RAC), developed the Safety Advancement Field Effort (SAFE) Program.

  5. 24 CFR 1006.430 - Corrective and remedial action.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... plan; (3) Made substantial progress in carrying out its program and achieving its quantifiable goals as... to submit progress schedules for completing activities or complying with the requirements of the Act... appropriate technical assistance using existing grant funds or other available resources to overcome the...

  6. An examination of women's representation and participation in bicycle advisory committees in California.

    DOT National Transportation Integrated Search

    2012-04-01

    In the United States, women bicycle at significantly lower rates than men. One method of remedying this disparity is to ensure that women are engaged in bicycle planning and policy making through, for example, participation in bicycle advisory commit...

  7. Rapid Semi-Quantitative Surface Mapping of Airborne-Dispersed Chemicals Using Mass Spectrometry

    EPA Science Inventory

    Chemicals can be dispersed accidentally, deliberately, or by weather-related events. Rapid mapping of contaminant distributions is necessary to assess exposure risks and to plan remediation, when needed. Ten pulverized aspirin or NoDozTM tablets containing caffeine wer...

  8. 40 CFR 300.500 - General.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... COMMUNITY RIGHT-TO-KNOW PROGRAMS NATIONAL OIL AND HAZARDOUS SUBSTANCES POLLUTION CONTINGENCY PLAN State... either assume the lead through a cooperative agreement for the response action or may be the support agency in EPA-lead remedial response. Section 300.515 sets forth requirements for state involvement in...

  9. 40 CFR 307.42 - Fund's obligation in the event of failure of remedial actions taken pursuant to CERCLA section 122.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SUPERFUND, EMERGENCY PLANNING, AND COMMUNITY RIGHT-TO... a settlement under section 122(b)(1) of CERCLA, the Fund shall be available for the costs of any new...

  10. Is Anyone Listening?

    ERIC Educational Resources Information Center

    Reid, Neil

    To remedy the lack of well-planned developmental listening programs and adequate listening instruction in New Zealand schools, the New Zealand Council for Educational Research has produced this research-based teacher guide. The following materials are included: objectives for the reading program, including seven characteristics of a good listener;…

  11. Economics of Soil Disturbance

    Treesearch

    Han-Sup Han

    2007-01-01

    Economic implications of soil disturbance are discussed in four categories: planning and layout, selection of harvesting systems and equipment, long-term site productivity loss, and rehabilitation treatments. Preventive measures are more effective in minimizing impacts on soils than rehabilitation treatments because of the remedial expenses, loss of productivity until...

  12. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Brandt, C.C.; Benson, S.B.; Beeler, D.A.

    The Clinch River Remedial Investigation (CRRI) is designed to address the transport, fate, and distribution of waterborne contaminants (radionuclides, metals, and organic compounds) released from the US Department of Energy`s (DOE`s) Oak Ridge Reservation (ORR) and to assess potential risks to human health and the environment associated with these contaminants. The remedial investigation is entering Phase 2, which has the following items as its objectives: define the nature and extent of the contamination in areas downstream from the DOE ORR, evaluate the human health and ecological risks posed by these contaminants, and perform preliminary identification and evaluation of potential remediationmore » alternatives. This plan describes the requirements, responsibilities, and roles of personnel during sampling, analysis, and data review for the Clinch River Environmental Restoration Program (CR-ERP). The purpose of the plan is to formalize the process for obtaining analytical services, tracking sampling and analysis documentation, and assessing the overall quality of the CR-ERP data collection program to ensure that it will provide the necessary building blocks for the program decision-making process.« less

  13. The phyto-remediation of radioactively contaminated land - a feasible approach or just bananas?

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Nesbitt, Victoria A

    2013-07-01

    Soil is an essential component of all terrestrial ecosystems and is under increasing threat from human activity. Techniques available for removing radioactive contamination from soil and aquatic substrates are limited and often costly to implement; particularly over large areas. Frequently, bulk soil removal, with its attendant consequences, is a significant component of the majority of contamination incidents. Alternative techniques capable of removing contamination or exposure pathways without damaging or removing the soil are therefore of significant interest. An increasing number of old nuclear facilities are entering 'care and maintenance', with significant ground contamination issues. Phyto-remediation - the use of plants'more » natural metabolic processes to remediate contaminated sites is one possible solution. Its key mechanisms include phyto-extraction and phyto-stabilisation. These are analogues of existing remedial techniques. Further, phyto-remediation can improve soil quality and stability and restore functionality. Information on the application of phyto-remediation in the nuclear industry is widely distributed over an extended period of time and sources. It is therefore difficult to quickly and effectively identify which plants would be most suitable for phyto-remediation on a site by site basis. In response, a phyto-remediation tool has been developed to address this issue. Existing research and case studies were reviewed to understand the mechanisms of phyto-remediation, its effectiveness and the benefits and limitations of implementation. The potential for cost recovery from a phyto-remediation system is also briefly considered. An overview of this information is provided here. From this data, a set of matrices was developed to guide potential users through the plant selection process. The matrices take the user through a preliminary screening process to determine whether the contamination present at their site is amenable to phyto-remediation, and to give a rough indication as to what plants might be suitable. The second two allow the user to target specific plant species that would be most likely to successfully establish based on prevailing site conditions. The outcome of this study is a phyto-remediation tool that can facilitate the development of phyto-remediation projects, avoiding the need for in-depth research to identify optimal plant species on a case-by-case basis. (authors)« less

  14. TECHNOLOGY INTEGRATION FOR CONTAMINATED SITE REMEDIATION: CLEANUP GOALS AND PERFORMANCE CRITERIA

    EPA Science Inventory

    There is a need to develop and field-test integrated remediation technologies that operate in a synergistic manner for cost-effective treatment of contaminated sites to achieve risk-based and rational endpoints. Aggressive technologies designed for rapid source-zone remediation m...

  15. TECHNICAL GUIDANCE DOCUMENT: CONSTRUCTION QUALITY MANAGEMENT FOR REMEDIAL ACTION AND REMEDIAL DESIGN WASTE CONTAINMENT SYSTEMS

    EPA Science Inventory

    This Technical Guidance Document is intended to augment the numerous construction quality control and construction quality assurance (CQC and CQA) documents that are available far materials associated with waste containment systems developed for Superfund site remediation. In ge...

  16. Technical Review of Retrieval and Closure Plans for the INEEL INTEC Tank Farm Facility

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bamberger, Judith A; Burks, Barry L; Quigley, Keith D

    2001-09-28

    The purpose of this report is to document the conclusions of a technical review of retrieval and closure plans for the Idaho National Energy and Environmental Laboratory (INEEL) Idaho Nuclear Technology and Engineering Center (INTEC) Tank Farm Facility. In addition to reviewing retrieval and closure plans for these tanks, the review process served as an information exchange mechanism so that staff in the INEEL High Level Waste (HLW) Program could become more familiar with retrieval and closure approaches that have been completed or are planned for underground storage tanks at the Oak Ridge National Laboratory (ORNL) and Hanford sites. Thismore » review focused not only on evaluation of the technical feasibility and appropriateness of the approach selected by INEEL but also on technology gaps that could be addressed through utilization of technologies or performance data available at other DOE sites and in the private sector. The reviewers, Judith Bamberger of Pacific Northwest National Laboratory (PNNL) and Dr. Barry Burks of The Providence Group Applied Technology, have extensive experience in the development and application of tank waste retrieval technologies for nuclear waste remediation.« less

  17. Evaluation and determination of soil remediation schemes using a modified AHP model and its application in a contaminated coking plant.

    PubMed

    Li, Xingang; Li, Jia; Sui, Hong; He, Lin; Cao, Xingtao; Li, Yonghong

    2018-07-05

    Soil remediation has been considered as one of the most difficult pollution treatment tasks due to its high complexity in contaminants, geological conditions, usage, urgency, etc. The diversity in remediation technologies further makes quick selection of suitable remediation schemes much tougher even the site investigation has been done. Herein, a sustainable decision support hierarchical model has been developed to select, evaluate and determine preferred soil remediation schemes comprehensively based on modified analytic hierarchy process (MAHP). This MAHP method combines competence model and the Grubbs criteria with the conventional AHP. It not only considers the competence differences among experts in group decision, but also adjusts the big deviation caused by different experts' preference through sample analysis. This conversion allows the final remediation decision more reasonable. In this model, different evaluation criteria, including economic effect, environmental effect and technological effect, are employed to evaluate the integrated performance of remediation schemes followed by a strict computation using above MAHP. To confirm the feasibility of this developed model, it has been tested by a benzene workshop contaminated site in Beijing coking plant. Beyond soil remediation, this MAHP model would also be applied in other fields referring to multi-criteria group decision making. Copyright © 2018 Elsevier B.V. All rights reserved.

  18. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Wellman, Dawn M.; Freshley, Mark D.; Truex, Michael J.

    Current requirements for site remediation and closure are standards-based and are often overly conservative, costly, and in some cases, technically impractical to achieve. Use of risk-informed alternate endpoints provide a means to achieve remediation goals that are permitted by regulations and are protective of human health and the environment. Alternate endpoints enable establishing a path for cleanup that may include intermediate remedial milestones and transition points and/or regulatory alternatives to standards-based remediation. A framework is presented that is centered around developing and refining conceptual models in conjunction with assessing risks and potential endpoints as part of a system-based assessment thatmore » integrates site data with scientific understanding of processes that control the distribution and transport of contaminants in the subsurface and pathways to receptors. This system based assessment and subsequent implementation of the remediation strategy with appropriate monitoring are targeted at providing a holistic approach to addressing risks to human health and the environment. This holistic approach also enables effective predictive analysis of contaminant behavior to provide defensible criteria and data for making long-term decisions. Developing and implementing an alternate endpoint-based approach for remediation and waste site closure presents a number of challenges and opportunities. Categories of these challenges include scientific and technical, regulatory, institutional, and budget and resource allocation issues. Opportunities exist for developing and implementing systems-based approaches with respect to supportive characterization, monitoring, predictive modeling, and remediation approaches.« less

  19. Evaluating expected outcomes of acid remediation in an intensively mined Appalachian watershed.

    PubMed

    Watson, Andrew S; Merovich, George T; Petty, J Todd; Gutta, J Brady

    2017-07-01

    Assessments of watershed-based restoration efforts are rare but are essential for the science of stream restoration to advance. We conducted a watershed scale assessment of Abram Creek before and after implementation of a watershed-based plan designed to maximize ecological recovery from acid mine drainage (AMD) impairment. We surveyed water chemistry, physical habitat, benthic macroinvertebrates, and fish community structure in three stream types: AMD-impacted (14 streams), AMD-treated (13 streams), and unimpaired reference (4 streams). We used in-stream measurements to quantify ecological loss from AMD, the amount of ecological recovery expected through remediation, and the observed degree of post-treatment recovery. Sites impaired by AMD improved in water quality with AMD treatment. Dissolved metals and acidity declined significantly in treated streams, but sulfate and specific conductance did not. Likewise, sites impaired by AMD improved in bio-condition scores with AMD treatment. EPT genera increased significantly but were lower compared to unimpaired streams. We found fish at nine treated sites that had none before treatment. Community-level analyses indicated improved but altered assemblages with AMD treatment. Analysis of pre-treatment conditions indicated that only 30% of the historic fishery remained. Remediation was expected to recover 66% of the historic fishery value, and assessment of post-treatment conditions indicates that 52% of the historic fishery has been recovered after 3 years. Developing expected endpoints for restoration outcomes provides a tool to objectively evaluate successes and can guide adaptive management strategies.

  20. Updated Conceptual Model for the 300 Area Uranium Groundwater Plume

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Zachara, John M.; Freshley, Mark D.; Last, George V.

    2012-11-01

    The 300 Area uranium groundwater plume in the 300-FF-5 Operable Unit is residual from past discharge of nuclear fuel fabrication wastes to a number of liquid (and solid) disposal sites. The source zones in the disposal sites were remediated by excavation and backfilled to grade, but sorbed uranium remains in deeper, unexcavated vadose zone sediments. In spite of source term removal, the groundwater plume has shown remarkable persistence, with concentrations exceeding the drinking water standard over an area of approximately 1 km2. The plume resides within a coupled vadose zone, groundwater, river zone system of immense complexity and scale. Interactionsmore » between geologic structure, the hydrologic system driven by the Columbia River, groundwater-river exchange points, and the geochemistry of uranium contribute to persistence of the plume. The U.S. Department of Energy (DOE) recently completed a Remedial Investigation/Feasibility Study (RI/FS) to document characterization of the 300 Area uranium plume and plan for beginning to implement proposed remedial actions. As part of the RI/FS document, a conceptual model was developed that integrates knowledge of the hydrogeologic and geochemical properties of the 300 Area and controlling processes to yield an understanding of how the system behaves and the variables that control it. Recent results from the Hanford Integrated Field Research Challenge site and the Subsurface Biogeochemistry Scientific Focus Area Project funded by the DOE Office of Science were used to update the conceptual model and provide an assessment of key factors controlling plume persistence.« less

  1. 77 FR 23987 - Approval and Promulgation of Implementation Plans; State of Montana; State Implementation Plan...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-20

    ...The Environmental Protection Agency (EPA) is proposing a Federal Implementation Plan (FIP) to address regional haze in the State of Montana. EPA developed this proposal in response to the State's decision in 2006 to not submit a regional haze State Implementation Plan (SIP) revision. EPA is proposing to determine that the FIP satisfies requirements of the Clean Air Act (CAA or ``the Act'') that require states, or EPA in promulgating a FIP, to assure reasonable progress towards the national goal of preventing any future and remedying any existing man-made impairment of visibility in mandatory Class I areas. In addition, EPA is also proposing to approve a revision to the Montana SIP submitted by the State of Montana through the Montana Department of Environmental Quality on February 17, 2012. The State's submittal contains revisions to the Montana Visibility Plan that includes amendments to the ``Smoke Management'' section, which adds a reference to Best Available Control Technology (BACT) as the visibility control measure for open burning as currently administered through the State's air quality permit program. This change was made to meet the requirements of the Regional Haze Rule. EPA will act on the remaining revisions in the State's submittal in a future action.

  2. Resident Evaluation and Remediation: A Comprehensive Approach

    PubMed Central

    Wu, Jim S.; Siewert, Bettina; Boiselle, Phillip M.

    2010-01-01

    Background A comprehensive evaluation and remediation program is an essential component of any residency program. The evaluation system should identify problems accurately and early and allow residents with problems to be assigned to a remediation program that effectively deals with them. Elements of a proactive remediation program include a process for outlining deficiencies, providing resources for improvement, communicating clear goals for acceptable performance, and reevaluating performance against these goals. Intervention In recognition of the importance of early detection and prompt remediation of the struggling resident, we sought to develop a multifaceted approach to resident evaluation with the aim of early identification and prompt remediation of difficulties. This article describes our comprehensive evaluation program and remediation program, which uses resources within our radiology department and institutional graduate medical education office. Discussion An effective evaluation system should identify problems accurately and early, whereas a proactive remediation program should effectively deal with issues once they are identified. PMID:21975628

  3. Expert reasoning within an object-oriented framework

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bohn, S.J.; Pennock, K.A.

    1991-10-01

    A large number of contaminated waste sites across the United States await site remediation efforts. These sites can be physically complex, composed of multiple, possibly interacting, contaminants distributed throughout one or more media. The Remedial Action Assessment System (RAAS) is being designed and developed to support decisions concerning the selection of remediation alternatives. The goal of this system is to broaden the consideration of remediation alternatives, while reducing the time and cost of making these considerations. The Remedial Action Assessment System was designed and constructed using object-oriented techniques. It is a hybrid system which uses a combination of quantitative andmore » qualitative reasoning to consider and suggest remediation alternatives. the reasoning process that drives this application is centered around an object-oriented organization of remediation technology information. This paper briefly describes the waste remediation problem and then discusses the information structure and organization RAAS utilizes to address it. 4 refs., 4 figs.« less

  4. Biological Oxidation of DCE through Manganese Addition

    DTIC Science & Technology

    2008-08-01

    indication that remediation has been incomplete and some environmental and human health risk may remain. Therefore, developing, testing and...Alamac) site in Lumberton, Robeson County, NC. Solutions-IES has worked on this site for ten years conducting groundwater assessment , remediation ...44 5.1.4 Site Remediation Efforts

  5. READING AND WRITING, THE REMEDIAL PROGRAM.

    ERIC Educational Resources Information Center

    Euclid English Demonstration Center, OH.

    THE PAPERS IN THIS COLLECTION EXPLAIN THE JUNIOR HIGH SCHOOL REMEDIAL PROGRAM IN READING AND WRITING DEVELOPED BY THE EUCLID ENGLISH DEMONSTRATION CENTER, THEY ARE (1) "REMEDIAL CLASSES AND THE TOTAL ENGLISH PROGRAM," BY GEORGE HILLOCKS, (2) "DEFINITION, ORIGIN, AND TREATMENT OF UNDERACHIEVEMENT," BY JANE W. KESSLER, (3)…

  6. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Owen, P.T.; Knox, N.P.; Fielden, J.M.

    This bibliography of 657 references with abstracts on the subject of nuclear facility decommissioning, uranium mill tailings management, and site remedial actions is the fourth in a series of annual reports prepared for the US Department of Energy, Division of Remedial Action Projects. Foreign as well as domestic documents of all types - technical reports, progress reports, journal articles, conference papers, symposium proceedings, theses, books, patents, legislation, and research project descriptions - have been references in this publication. The bibliography contains scientific (basic research as well as applied technology), economic, regulatory, and legal literature pertinent to the US Department ofmore » Energy's Remedial Action Program. Major chapters are: (1) Surplus Facilities Management Program; (2) Nuclear Facilities Decommissioning; (3) Formerly Utilized Sites Remedial Action Program; (4) Uranium Mill Tailings Remedial Action Program; (5) Grand Junction Remedial Action Program; and (6) Uranium Mill Tailings Management. Chapter sections for chapters 1 and 2 include: Design, Planning, and Regulations; Site Surveys; Decontamination Studies; Dismantlement and Demolition; Land Decontamination and Reclamation; Waste Disposal; and General studies. The references within each chapter or section are arranged alphabetically by leading author. References having no individual author are arranged by corporate author, or by title. Indexes are provided for the categories of author, corporate affiliation, title, publication description, geographic location, and keywords. Appendix A lists 264 bibliographic references to literature identified during this reporting period but not abstracted due to time constraints. Title and publication description indexes are given for this appendix. Appendix B defines frequently used acronyms, and Appendix C lists the recipients of this report according to their corporate affiliation.« less

  7. Biological technologies for the remediation of co-contaminated soil.

    PubMed

    Ye, Shujing; Zeng, Guangming; Wu, Haipeng; Zhang, Chang; Dai, Juan; Liang, Jie; Yu, Jiangfang; Ren, Xiaoya; Yi, Huan; Cheng, Min; Zhang, Chen

    2017-12-01

    Compound contamination in soil, caused by unreasonable waste disposal, has attracted increasing attention on a global scale, particularly since multiple heavy metals and/or organic pollutants are entering natural ecosystem through human activities, causing an enormous threat. The remediation of co-contaminated soil is more complicated and difficult than that of single contamination, due to the disparate remediation pathways utilized for different types of pollutants. Several modern remediation technologies have been developed for the treatment of co-contaminated soil. Biological remediation technologies, as the eco-friendly methods, have received widespread concern due to soil improvement besides remediation. This review summarizes the application of biological technologies, which contains microbial technologies (function microbial remediation and composting or compost addition), biochar, phytoremediation technologies, genetic engineering technologies and biochemical technologies, for the remediation of co-contaminated soil with heavy metals and organic pollutants. Mechanisms of these technologies and their remediation efficiencies are also reviewed. Based on this study, this review also identifies the future research required in this field.

  8. Natural attenuation of metals and radionuclides: Report from a workshop held by Sandia National Laboratories

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Brady, P.V.; Borns, D.J.

    1997-11-01

    Natural attenuation is increasingly applied to remediate contaminated soils and ground waters. Roughly 25% of Superfund groundwater remedies in 1995 involved some type of monitored natural attenuation, compared to almost none 5 years ago. Remediation by natural attenuation (RNA) requires clear evidence that contaminant levels are decreasing sufficiently over time, a defensible explanation of the attenuation mechanism, long-term monitoring, and a contingency plan at the very least. Although the primary focus of implementation has to date been the biodegradation of organic contaminants, there is a wealth of scientific evidence that natural processes reduce the bioavailability of contaminant metals and radionuclides.more » Natural attenuation of metals and radionuclides is likely to revolve around sorption, solubility, biologic uptake and dilution controls over contaminant availability. Some of these processes can be applied to actively remediate sites. Others, such as phytoremediation, are likely to be ineffective. RNA of metals and radionuclides is likely to require specialized site characterization to construct contaminant and site-specific conceptual models of contaminant behavior. Ideally, conceptual models should be refined such that contaminant attenuation can be confidently predicted into the future. The technical approach to RNA of metals and radionuclides is explored here.« less

  9. NASA Remediation Technology Collaboration Development Task, Overview and Project Summaries

    NASA Technical Reports Server (NTRS)

    Romeo, James G.

    2014-01-01

    An overview presentation of NASA's Remediation Technology Collaboration Development Task including the following project summaries: in situ groundwater monitor, in situ chemical oxidation, in situ bioremediation, horizontal multi-port well, and high resolution site characterization.

  10. Site remediation techniques in India: a review

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Anomitra Banerjee; Miller Jothi

    India is one of the developing countries operating site remediation techniques for the entire nuclear fuel cycle waste for the last three decades. In this paper we intend to provide an overview of remediation methods currently utilized at various hazardous waste sites in India, their advantages and disadvantages. Over the years the site remediation techniques have been well characterized and different processes for treatment, conditioning and disposal are being practiced. Remediation Methods categorized as biological, chemical or physical are summarized for contaminated soils and environmental waters. This paper covers the site remediation techniques implemented for treatment and conditioning of wastelandsmore » arising from the operation of nuclear power plant, research reactors and fuel reprocessing units. (authors)« less

  11. New developments in transit noise and vibration criteria

    NASA Astrophysics Data System (ADS)

    Hanson, Carl E.

    2004-05-01

    Federal Transit Administration (FTA) noise and vibration impact criteria were developed in the early 1990's. Noise criteria are ambient-based, developed from the Schultz curve and fundamental research performed by the U.S. Environmental Protection Agency in the 1970's. Vibration criteria are single-value rms vibration velocity levels. After 10 years of experience applying the criteria in assessments of new transit projects throughout the United States, FTA is updating its methods. Approach to assessment of new projects in existing high-noise environments will be clarified. Method for assessing noise impacts due to horn blowing at grade crossings will be provided. Vibration criteria will be expanded to include spectral information. This paper summarizes the background of the current criteria, discusses examples where existing methods are lacking, and describes the planned remedies to improve criteria and methods.

  12. Design of optimal groundwater remediation systems under flexible environmental-standard constraints.

    PubMed

    Fan, Xing; He, Li; Lu, Hong-Wei; Li, Jing

    2015-01-01

    In developing optimal groundwater remediation strategies, limited effort has been exerted to solve the uncertainty in environmental quality standards. When such uncertainty is not considered, either over optimistic or over pessimistic optimization strategies may be developed, probably leading to the formulation of rigid remediation strategies. This study advances a mathematical programming modeling approach for optimizing groundwater remediation design. This approach not only prevents the formulation of over optimistic and over pessimistic optimization strategies but also provides a satisfaction level that indicates the degree to which the environmental quality standard is satisfied. Therefore the approach may be expected to be significantly more acknowledged by the decision maker than those who do not consider standard uncertainty. The proposed approach is applied to a petroleum-contaminated site in western Canada. Results from the case study show that (1) the peak benzene concentrations can always satisfy the environmental standard under the optimal strategy, (2) the pumping rates of all wells decrease under a relaxed standard or long-term remediation approach, (3) the pumping rates are less affected by environmental quality constraints under short-term remediation, and (4) increased flexible environmental standards have a reduced effect on the optimal remediation strategy.

  13. Cognitive Remediation: A New Generation of Psychosocial Interventions for People with Schizophrenia

    PubMed Central

    Eack, Shaun M.

    2013-01-01

    Schizophrenia is a mental health condition characterized by broad impairments in cognition, which place profound limitations on functional recovery. Social work has an enduring legacy in pioneering the development of novel psychosocial interventions for people with schizophrenia, and this article introduces cognitive remediation, the latest advance in psychosocial treatments for the disorder designed to improve cognition. First, an overview of the nature of cognitive impairments and their functional consequences in schizophrenia is presented, followed by a description of the theoretical basis and key practice principles of cognitive remediation. Next, the latest biopsychosocial evidence for the efficacy of cognitive remediation in schizophrenia is critically reviewed. Finally, a model cognitive remediation program, Cognitive Enhancement Therapy, which was developed and evaluated by a social work-led multidisciplinary team is presented. Cognitive Enhancement Therapy represents a significant advance in cognitive remediation for schizophrenia, and uses a unique holistic approach that extends beyond traditional neurocognitive training to facilitate the achievement of adult social-cognitive milestones and broader functional recovery. It is concluded that cognitive remediation represents an effective next generation of psychosocial interventions that social workers can use to help improve the lives of many people who live with schizophrenia. PMID:23252315

  14. Room To Grow? Facilities Programming for Colleges and Universities.

    ERIC Educational Resources Information Center

    Thompson, Roger; Adams, Tom

    2001-01-01

    Asserts that campus space needs could be remedied by moving centrally located service delivery organizations, such as fleet vehicle maintenance facilities. Describes the process of operational and space needs assessment; this process provides information that enables architects to plan for appropriate adjacencies, correct space allocation, and…

  15. Comment Period for Proposed Remedy Selection Plan for Multiple Training Areas located at Joint Base Cape Cod

    EPA Pesticide Factsheets

    The U.S. Environmental Protection Agency (EPA) is seeking public comment on the EPA’s proposal indicating no further action is needed for multiple Training Areas on the Camp Edwards portion of Joint Base Cape Cod (JBCC).

  16. MODELLING QUALITY ASSURANCE PLAN FOR THE LAKE MICHIGAN MASS BALANCE PROJECT

    EPA Science Inventory

    With the ever increasing complexity and costs of ecosystem protection and remediation, the USEPA is placing more emphasis on ensuring the quality and credibility of scientific tools, such as models, that are used to help guide decision-makers who are faced with difficult manageme...

  17. Simultaneous and Successive Processing in Children with Reading Disability.

    ERIC Educational Resources Information Center

    Das, J. P.

    1984-01-01

    Considered are implications for learning disabled students of the simultaneous, successive, and planning (SSP) model, a model of information integration that emphasizes processes rather than ability. Remedial training guidelines are offered, including assessment of learning potential and determination of the nature of the weakness and its…

  18. Lessons Learned from Breaking Through. In Brief

    ERIC Educational Resources Information Center

    Bragg, Debra D.; Barnett, Elisabeth

    2009-01-01

    The Breaking Through (BT) initiative promotes an expanded and enhanced role for community colleges in providing access to college for low-skilled adults. BT is uniquely important in its systematic integration of adult education, developmental/remedial education, professional-technical education (PTE), and career planning and preparation in…

  19. RCRA, Superfund and EPCRA hotline training module. Introduction to: the Superfund response program (updated February 1998); Directive

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1998-06-01

    This module includes the following: Regulatory Summary (Definitions; National Contingency Plan; Notification or Discovery; Response Process; Removal Process; Remedial Process; Community Involvement; State Role; Natural Resource Damage Assessments; Federal Facility Response; and Contractor Support); and Module Summary.

  20. 7 CFR 400.458 - Scheme or device.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 7 Agriculture 6 2014-01-01 2014-01-01 false Scheme or device. 400.458 Section 400.458 Agriculture... AGRICULTURE GENERAL ADMINISTRATIVE REGULATIONS Administrative Remedies for Non-Compliance § 400.458 Scheme or... material scheme or device to obtain catastrophic risk protection, other plans of insurance coverage, or...

  1. 7 CFR 400.458 - Scheme or device.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 6 2010-01-01 2010-01-01 false Scheme or device. 400.458 Section 400.458 Agriculture... AGRICULTURE GENERAL ADMINISTRATIVE REGULATIONS Administrative Remedies for Non-Compliance § 400.458 Scheme or... material scheme or device to obtain catastrophic risk protection, other plans of insurance coverage, or...

  2. 7 CFR 400.458 - Scheme or device.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 7 Agriculture 6 2013-01-01 2013-01-01 false Scheme or device. 400.458 Section 400.458 Agriculture... AGRICULTURE GENERAL ADMINISTRATIVE REGULATIONS Administrative Remedies for Non-Compliance § 400.458 Scheme or... material scheme or device to obtain catastrophic risk protection, other plans of insurance coverage, or...

  3. 7 CFR 400.458 - Scheme or device.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 7 Agriculture 6 2011-01-01 2011-01-01 false Scheme or device. 400.458 Section 400.458 Agriculture... AGRICULTURE GENERAL ADMINISTRATIVE REGULATIONS Administrative Remedies for Non-Compliance § 400.458 Scheme or... material scheme or device to obtain catastrophic risk protection, other plans of insurance coverage, or...

  4. 7 CFR 400.458 - Scheme or device.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 7 Agriculture 6 2012-01-01 2012-01-01 false Scheme or device. 400.458 Section 400.458 Agriculture... AGRICULTURE GENERAL ADMINISTRATIVE REGULATIONS Administrative Remedies for Non-Compliance § 400.458 Scheme or... material scheme or device to obtain catastrophic risk protection, other plans of insurance coverage, or...

  5. Remediation of Content/Skill Deficiencies in Middle Level Students.

    ERIC Educational Resources Information Center

    Price, John L.; And Others

    A remediation approach developed by the Vilonia public schools (Arkansas) to remediate content/skill deficiencies in middle level students resulted from three conditions: state laws and regulations regarding minimum competency testing; more awareness of problems with at-risk students; and recognition of the need to reach students academically…

  6. An Overview of Public Domain Tools for Measuring the Sustainability of Environmental Remediation - 12060

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Claypool, John E.; Rogers, Scott

    The application of sustainability principles to the investigation and remediation of contaminated sites is an area of rapid development within the environmental profession, with new business practices, tools, and performance standards for identifying, evaluating, and managing the 'collateral' impacts of cleanup projects to the environment, economy and society coming from many organizations. Guidelines, frameworks, and standards of practice for 'green and sustainable remediation' (GSR) have been released and are under development by the Sustainable Remediation Forum (SURF), the American Society for Testing Materials (ASTM), the Interstate Technology Roundtable Commission (ITRC) and other organizations in the U.S. and internationally. In responsemore » to Executive Orders from the President, Federal government agencies have developed policies, procedures and guidelines for evaluating and reporting the sustainability of their environmental restoration projects. Private sector companies in the petroleum, utility, manufacturing, defense, and other sectors are developing their own corporate GSR programs to improve day-to-day management of contaminated sites and to support external reporting as part of their corporate social responsibility (CSR) efforts. The explosion of mandates, policy, procedures and guidance raises the question of how to determine whether a remediation technology or cleanup approach is green and/or sustainable. The environmental profession has responded to this question by designing, developing and deploying a wide array of tools, calculators, and databases that enable regulatory agencies, site managers and environmental professionals to calculate the collateral impacts of their remediation projects in the environmental, social, and economic domains. Many of these tools are proprietary ones developed by environmental engineering/consulting firms for use in their consulting engagements and/or tailored specifically to meet the needs of their clients. When it comes to the public domain, Federal government agencies are spearheading the development of software tools to measure and report emissions of air pollutants (e.g., carbon dioxide, other greenhouse gases, criteria air pollutants); consumption of energy, water and natural resources; accident and safety risks; project costs and other economic metrics. Most of the tools developed for the Government are available to environmental practitioners without charge, so they are growing in usage and popularity. The key features and metrics calculated by the available public-domain tools for measuring the sustainability of environmental remediation projects share some commonalities but there are differences amongst the tools. The SiteWise{sup TM} sustainability tool developed for the Navy and US Army will be compared with the Sustainable Remediation Tool (SRT{sup TM}) developed for the US Air Force (USAF). In addition, the USAF's Clean Solar and Wind Energy in Environmental Programs (CleanSWEEP), a soon-to-be-released tool for evaluating the economic feasibility of utilizing renewal energy for powering remediation systems will be described in the paper. (authors)« less

  7. Restoring public trust while tearing down site in rural Ohio

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Schneider, Jerry; Wagner, Jeffrey; Connell, Judy

    2007-07-01

    In the mid-1980's, the impact of three decades of uranium processing near rural Fernald, Ohio, 18 miles northwest of Cincinnati, became the centre of national public controversy. When a series of incidents at the uranium foundry brought to light the years of contamination to the environment and surrounding farmland communities, local citizens' groups united and demanded a role in determining the plans for cleaning up the site. One citizens' group, Fernald Residents for Environmental Safety and Health (FRESH), formed in 1984 following reports that nearly 300 pounds of enriched uranium oxide had been released from a dust-collector system, and threemore » off-property wells south of the site were contaminated with uranium. For 22 years, FRESH monitored activities at Fernald and participated in the decision-making process with management and regulators. The job of FRESH ended on 19 January this year when the Fernald Site was declared clean of all nuclear contamination and open to public access. It marked the end of a remarkable turnaround in public confidence and trust that had attracted critical reports from around the world. When personnel from Fluor arrived in 1992, the management team thought it understood the issues and concerns of each stakeholder group, and was determined to implement the decommissioning scope of work aggressively, confident that stakeholders would agree with its plans. This approach resulted in strained relationships with opinion leaders during the early months of Fluor's contract. To forge better relationships, the U.S. Department of Energy (DOE) who owns the site, and Fluor embarked on three new strategies based on engaging citizens and interested stakeholder groups in the decision-making process. The first strategy was opening communication channels with site leadership, technical staff, and regulators. This strategy combined a strong public-information program with two-way communications between management and the community, soliciting and encouraging stakeholder participation early in the decision-making process. Fluor's public-participation strategy exceeded the 'check-the-box' approach common within the nuclear-weapons complex, and set a national standard that stands alone today. The second stakeholder-engagement strategy sprang from mending fences with the regulators and the community. The approach for disposing low-level waste was a 25-year plan to ship it off the site. Working with stakeholders, DOE and Fluor were able to convince the community to accept a plan to safely store waste permanently on site, which would save 15 years of cleanup and millions of dollars in cost. The third strategy addressed the potentially long delays in finalizing remedial action plans due to formal public comment periods and State and Federal regulatory approvals. Working closely with the U.S. and Ohio Environmental Protection Agencies (EPA) and other stakeholders, DOE and Fluor were able to secure approvals of five Records of Decision on time - a first for the DOE complex. Developing open and honest relationships with union leaders, the workforce, regulators and community groups played a major role in DOE and Fluor cleaning up and closing the site. Using lessons learned at Fernald, DOE was able to resolve challenges at other sites, including worker transition, labour disputes, and damaged relationships with regulators and the community. It took significant time early in the project to convince the workforce that their future lay in cleanup, not in holding out hope for production to resume. It took more time to repair relationships with Ohio regulators and the local community. Developing these relationships over the years required constant, open communications between site decision makers and stakeholders to identify issues and to overcome potential barriers. Fluor's open public-participation strategy resulted in stakeholder consensus of five remedial-action plans that directed Fernald cleanup. This strategy included establishing a public-participation program that emphasized a shared-decision making process and abandoned the government's traditional, non-participatory 'Decide, Announce, Defend' approach. Fernald's program became a model within the DOE complex for effective public participation. Fluor led the formation of the first DOE site-specific advisory board dedicated to remediation and closure. The board was successful at building consensus on critical issues affecting long-term site remediation, such as cleanup levels, waste disposal and final land use. Fluor created innovative public outreach tools, such as 'Cleanopoly', based on the Monopoly game, to help illustrate complex concepts, including risk levels, remediation techniques, and associated costs. These innovative tools helped DOE and Fluor gain stakeholder consensus on all cleanup plans. To commemorate the outstanding commitment of Fernald stakeholders to this massive environmental-restoration project, Fluor donated $20,000 to build the Weapons to Wetlands Grove overlooking the former 136-acre production area. The grove contains 24 trees, each dedicated to '[a] leader(s) behind the Fernald cleanup'. Over the years, Fluor, through the Fluor Foundation, also invested in educational and humanitarian projects, contributing nearly $2 million to communities in southwestern Ohio, Kentucky and Indiana. Further, to help offset the economic impact of the site's closing to the community, DOE and Fluor promoted economic development in the region by donating excess equipment and property to local schools and townships. This paper discusses the details of the public-involvement program - from inception through maturity - and presents some lessons learned that can be applied to other similar projects. (authors)« less

  8. Dimensionality and R4P: A Health Equity Framework for Research Planning and Evaluation in African American Populations.

    PubMed

    Hogan, Vijaya; Rowley, Diane L; White, Stephanie Baker; Faustin, Yanica

    2018-02-01

    Introduction Existing health disparities frameworks do not adequately incorporate unique interacting contributing factors leading to health inequities among African Americans, resulting in public health stakeholders' inability to translate these frameworks into practice. Methods We developed dimensionality and R4P to integrate multiple theoretical perspectives into a framework of action to eliminate health inequities experienced by African Americans. Results The dimensional framework incorporates Critical Race Theory and intersectionality, and includes dimensions of time-past, present and future. Dimensionality captures the complex linear and non-linear array of influences that cause health inequities, but these pathways do not lend themselves to approaches to developing empirically derived programs, policies and interventions to promote health equity. R4P provides a framework for addressing the scope of actions needed. The five components of R4P are (1) Remove, (2) Repair, (3) Remediate, (4) Restructure and (5) Provide. Conclusion R4P is designed to translate complex causality into a public health equity planning, assessment, evaluation and research tool.

  9. Fluor Hanford, Inc. Groundwater and Technical Integration Support (Master Project) Quality Assurance Management Plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Fix, N. J.

    The scope of the Fluor Hanford, Inc. Groundwater and Technical Integration Support (Master Project) is to provide technical and integration support to Fluor Hanford, Inc., including operable unit investigations at 300-FF-5 and other groundwater operable units, strategic integration, technical integration and assessments, remediation decision support, and science and technology. This Quality Assurance Management Plan provides the quality assurance requirements and processes that will be followed by the Fluor Hanford, Inc. Groundwater and Technical Integration Support (Master Project).

  10. ANALYTICAL PLANS SUPPORTING THE SWPF GAP ANALYSIS BEING CONDUCTED WITH ENERGYSOLUTIONS AND THE VITREOUS STATE LABORATORY AT THE CUA

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Edwards, T.; Peeler, D.

    2014-10-28

    EnergySolutions (ES) and its partner, the Vitreous State Laboratory (VSL) of The Catholic University of America (CUA), are to provide engineering and technical services support to Savannah River Remediation, LLC (SRR) for ongoing operation of the Defense Waste Processing Facility (DWPF) flowsheet as well as for modifications to improve overall plant performance. SRR has requested that the glass formulation team of Savannah River National Laboratory (SRNL) and ES-VSL develop a technical basis that validates the current Product Composition Control System models for use during the processing of the coupled flowsheet or that leads to the refinements of or modifications tomore » the models that are needed so that they may be used during the processing of the coupled flowsheet. SRNL has developed a matrix of test glasses that are to be batched and fabricated by ES-VSL as part of this effort. This document provides two analytical plans for use by ES-VSL: one plan is to guide the measurement of the chemical composition of the study glasses while the second is to guide the measurement of the durability of the study glasses based upon the results of testing by ASTM’s Product Consistency Test (PCT) Method A.« less

  11. Technological change in revitalization - Phytoremediation and the role of nonknowledge.

    PubMed

    Bleicher, Alena

    2016-12-15

    In the 1990s, remediation methods that use plants to investigate and extract contaminations were developed. According to their proponents, these technologies have considerable potential for greening remediation and to develop a more sustainable trajectory for revitalization. Although a great deal of research has been conducted on these technologies they have, so far, rarely been applied in European countries. This article will contribute a perspective from social science to this debate. By taking an approach inspired by social science practice theories, attention will be drawn to a specific socio-cultural aspect: dealing with nonknowledge. The analysis of remediation practices reveals how the phenomenon of nonknowledge becomes relevant in the process of inventing and applying new technologies. This allows for a better understanding of technological innovation processes in remediation. Based on this understanding strategies are suggested which might increase the use of plant-based technologies in remediation and site management. Copyright © 2016 Elsevier Ltd. All rights reserved.

  12. Community Involvement as an Effective Institutional Control at the Weldon Spring Site, a U.S. Department of Energy Office of Legacy Management Site

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Deyo, Y.E.; Pauling, T.

    2006-07-01

    The U.S. Department of Energy (DOE) Weldon Spring Site Remedial Action Project (WSSRAP) was conducted for the purpose of remediating a portion of a former trinitrotoluene and dinitrotoluene production plant that was operational from 1941 to 1945 and a former uranium refinery that was operational from 1957 to 1966. Surface remediation activities concluded in 2001 with the completion of a 45-acre (.18 square kilometer) on-site engineered disposal facility. Long-term surveillance and maintenance activities at the site were officially transferred to the DOE Office of Legacy Management in 2003. The Weldon Spring Site is located within the St. Louis, Missouri, metropolitanmore » area (population 3 million). DOE's close relationship with surrounding land owners created a need for innovative solutions to long-term surveillance and maintenance issues at the site. Through a Secretarial proclamation, a plan was established for development of a comprehensive public involvement and education program. This program would act as an institutional control to communicate the historical legacy of the site and would make information available about contamination present at the site to guide people in making decisions about appropriate site activities. In August 2002, the Weldon Spring Site Interpretive Center opened to the public with exhibits about the history of the area, the remediation work that was completed, and a site information repository that is available to visitors. In addition, the Hamburg Trail for hiking and biking was constructed as a joint DOE/MDC effort. The 8-mile trail travels through both DOE and MDC property; a series of historical markers posted along its length to communicate the history of the area and the remediation work that was done as part of WSSRAP activities. A ramp and viewing platform with informational plaques were constructed on the disposal cell to provide an additional mechanism for public education. With a basic marketing program, site visitor-ship has been steadily increasing. In 2005, approximately 15,400 visitors were associated with Interpretive Center operations and outreach activities. Science-oriented educational programs that directly relate to past remediation activities and present long-term surveillance and maintenance issues have been developed and are presented to St. Louis area school groups and other community-based organizations. Other innovative programs have been developed to address daily maintenance issues at the site and to promote beneficial community re-use of the property. Approximately 30,000 square feet of the former Administration Building has been transferred through a use-permit to Lindenwood University, a local institution with a total enrollment of about 12,000 students. Lindenwood is establishing a satellite college campus in the building in exchange for providing basic maintenance and payment of utilities for both the Administration Building and Interpretive Center. A volunteer program developed to address maintenance of the native plant gardens that surround the Interpretive Center has a current enrollment of approximately 25 volunteers. Another volunteer group of prairie ecosystem experts has been meeting regularly for the last 3 years to assist the site in long-term management of the established prairie surrounding the disposal cell. Public support of these community involvement activities at the site is strong. DOE has worked closely with the Weldon Spring Citizens Commission in developing the concepts for this approach and the Commission has helped promote these activities within the community. It is expected that continued public education in this manner will only serve to strengthen the institutional control commitments at the Weldon Spring Site. (authors)« less

  13. Remedial Action Assessment System: A computer-based methodology for conducting feasibility studies

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    White, M.K.; Buelt, J.L.; Stottlemyre, J.A.

    1991-02-01

    Because of the complexity and number of potential waste sites facing the US Department of Energy (DOE) for potential cleanup, DOE is supporting the development of a computer-based methodology to streamline the remedial investigation/feasibility study process. The Remedial Action Assessment System (RAAS), can be used for screening, linking, and evaluating established technology processes in support of conducting feasibility studies. It is also intended to do the same in support of corrective measures studies. The user interface employs menus, windows, help features, and graphical information while RAAS is in operation. Object-oriented programming is used to link unit processes into sets ofmore » compatible processes that form appropriate remedial alternatives. Once the remedial alternatives are formed, the RAAS methodology can evaluate them in terms of effectiveness, implementability, and cost. RAAS will access a user-selected risk assessment code to determine the reduction of risk after remedial action by each recommended alternative. The methodology will also help determine the implementability of the remedial alternatives at a site and access cost estimating tools to provide estimates of capital, operating, and maintenance costs. This paper presents the characteristics of two RAAS prototypes currently being developed. These include the RAAS Technology Information System, which accesses graphical, tabular and textual information about technologies, and the main RAAS methodology, which screens, links, and evaluates remedial technologies. 4 refs., 3 figs., 1 tab.« less

  14. Unreliable Sustainable Infrastructure: Three Transformations to Guide Cities towards Becoming Healthy 'Smart Cities'

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sperling, Joshua; Fisher, Stephen; Reiner, Mark B.

    The term 'leapfrogging' has been applied to cities and nations that have adopted a new form of infrastructure by bypassing the traditional progression of development, e.g., from no phones to cell phones - bypassing landlines all together. However, leapfrogging from unreliable infrastructure systems to 'smart' cities is too large a jump resulting in unsustainable and unhealthy infrastructure systems. In the Global South, a baseline of unreliable infrastructure is a prevalent problem. The push for sustainable and 'smart' [re]development tends to ignore many of those already living with failing, unreliable infrastructure. Without awareness of baseline conditions, uninformed projects run the riskmore » of returning conditions to the status quo, keeping many urban populations below targets of the United Nations' Sustainable Development Goals. A key part of understanding the baseline is to identify how citizens have long learned to adjust their expectations of basic services. To compensate for poor infrastructure, most residents in the Global South invest in remedial secondary infrastructure (RSI) at the household and business levels. The authors explore three key 'smart' city transformations that address RSI within a hierarchical planning pyramid known as the comprehensive resilient and reliable infrastructure systems (CRISP) planning framework.« less

  15. ICD-10: from assessment to remediation to strategic opportunity.

    PubMed

    Dugan, John K

    2012-02-01

    Healthcare finance teams should perform an enterprisewide assessment to determine what ICD-10 means to their organization, strategically, operationally, and financially. CFOs should strategically evaluate the impact of ICD-10 on the organization's entire financial operation. Organizations should have a contingency plan in place across all processes.

  16. Entanglements of Discipline, Behavioral Intervention, Race, and Disability

    ERIC Educational Resources Information Center

    Bornstein, Joshua

    2017-01-01

    In 2011, an urban school district that had been cited for excessive and disproportionate suspension by race and disability sought to establish guidelines for Positive Behavioral Interventions and Supports (PBIS) as a remedy. District leaders held a PBIS planning meeting that included a broad collection of stakeholders. As they discussed…

  17. Remedial action plan and site design for stabilization of the inactive uranium mill tailings sites at Rifle, Colorado

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1990-02-01

    This volume contains appendices D6 through D8 containing laboratory test data: from MK-F investigation, 1987, Old Rifle and New Rifle sites; on bentonite amended radon barrier material; and from MK-F investigation, 1987, riprap tests.

  18. The Use of Microcomputers in the Treatment of Cognitive-Communicative Impairments.

    ERIC Educational Resources Information Center

    Story, Tamara B.; Sbordone, Robert J.

    1988-01-01

    The use of microcomputer-assisted therapy as part of the total rehabilitation plan for brain-injured individuals with cognitive-communicative impairments is addressed. Design of effective computer-assisted remediation requires a careful decision-making process. Specific types of software are suggested for dealing with deficits in organization,…

  19. Disproportionate Placement of Black and Hispanic Students in Special Education Programs.

    ERIC Educational Resources Information Center

    Goodale, Ronda; Soden, Marcia

    The paper examines practices and procedures that are seen as contributory to disproportionate placement of Black and Hispanic students in special education programs and discusses various components of the Boston Public School's Remedial Plan. Practices and procedures critical in disproportionate placement are seen to include biased assessment,…

  20. Field Summary Report for Remedial Investigation of Hanford Site Releases to the Columbia River, Hanford Site, Washington

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    L.C. Hulstrom

    2010-09-28

    This report documents field activity associated with the collection, preparation, and shipment of fish samples. The purpose of the report is to describe the sampling locations, identify samples collected, and describe any modifications and additions made to the sampling and analysis plan.

  1. The Incredible Shrinking Institution: A Five-Component Downsizing Model.

    ERIC Educational Resources Information Center

    Dawson, Bradley L.

    1991-01-01

    Most colleges and universities need to reduce expenditures and downsize. Such a project is difficult and emotionally charged. Many immediate remedies can ba applied to reduce and better control expenditures, but a more thorough analysis of the institution's organizational structure, operating procedures, automated systems, strategic planning, and…

  2. An examination of women's representation and participation in bicycle advisory committees in California : [research brief].

    DOT National Transportation Integrated Search

    2012-04-01

    In the United States, women bicycle at significantly lower rates than men. One method of remedying this disparity is to ensure that women are engaged in bicycle planning and policy making. A bicycle advisory committee is one type of group that undert...

  3. 42 CFR 488.303 - State plan requirement.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... recognition, incentive payments, or both, nursing facilities that provide the highest quality care to Medicaid...) Transfer of residents. (5) Closure of the facility and transfer of residents. (6) State monitoring. (e... remedies that are in addition to those specified in paragraph (d) or (e) of this section, or alternative to...

  4. 40 CFR 300.815 - Administrative record file for a remedial action.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... SUBSTANCES POLLUTION CONTINGENCY PLAN Administrative Record for Selection of Response Action § 300.815... investigation phase. At such time, the lead agency shall publish in a major local newspaper of general circulation a notice of the availability of the administrative record file. (b) The lead agency shall provide...

  5. 76 FR 35351 - Capital Plans

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-17

    ... requirements, on large bank holding companies.\\9\\ As the Board implements the Dodd-Frank Act, bank holding... remediation requirements imposed under the Dodd-Frank Act may result in additional limitations on a company's... or treated as a bank holding company pursuant to section 8(a) of the International Banking Act of...

  6. How to Perform Transcaval Access and Closure for Transcatheter Aortic Valve Implantation

    PubMed Central

    Lederman, Robert J.; Babaliaros, Vasilis C.; Greenbaum, Adam B.

    2016-01-01

    Transcaval, or caval-aortic, access is a promising approach for fully percutaneous trans-catheter aortic valve implantation in patients without good conventional access options. This tutorial review provides step-by-step guidance to planning and executing the procedure, along with approaches to remedy complications. PMID:26356244

  7. State-by-State Analysis of High School Feedback Reports

    ERIC Educational Resources Information Center

    Data Quality Campaign, 2013

    2013-01-01

    The best information to help stakeholders evaluate and strengthen their efforts to improve students' college and career readiness is actual information about students' success beyond high school, such as enrollment, remediation, degree and certification completion, and employment outcomes. States have a critical role to plan in providing…

  8. 40 CFR 307.22 - Preauthorization of response actions.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... remedial investigation and feasibility study shall, in addition to the requirements in paragraph (b) of this section, include: (1) The scope of the proposed study; (2) A proposed site sampling plan and... recent draft of any pending agreement, reached between such parties and the Federal Government; and (2...

  9. Counselor Educators' Gatekeeping Responsibilities and Students' First Amendment Rights

    ERIC Educational Resources Information Center

    Hutchens, Neal; Block, Jason; Young, Marianne

    2013-01-01

    In 2 recent legal cases, graduate counselor education students challenged the imposition of remediation plans as violating their First Amendment rights of freedom of speech and religion. With special emphasis on this recent litigation, the article examines the legal standards governing the authority of counselor educators at public colleges and…

  10. Pharmacogenetics of the Neurodevelopmental Impact of Anticancer Chemotherapy

    ERIC Educational Resources Information Center

    Robaey, Philippe; Krajinovic, Maja; Marcoux, Sophie; Moghrabi, Albert

    2008-01-01

    Pharmacogenetics holds the promise of minimizing adverse neurodevelopmental outcomes of cancer patients by identifying patients at risk, enabling the individualization of treatment and the planning of close follow-up and early remediation. This review focuses first on methotrexate, a drug often implicated in neurotoxicity, especially when used in…

  11. 77 FR 21526 - Eastern Washington Cascades Provincial Advisory Committee and the Yakima Provincial Advisory...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-10

    ... Parks office, 270 9th Street NE., East Wenatchee, WA has been replaced with an open public meeting... Stewardship Challenge, Yakima River Basin Integrated Water Resource Management Plan, Holden Mine Remediation..., Okanogan- Wenatchee National Forest, 215 Melody Lane, Wenatchee, Washington 98801, phone 509-664-9200...

  12. Remediation approaches for polycyclic aromatic hydrocarbons (PAHs) contaminated soils: Technological constraints, emerging trends and future directions.

    PubMed

    Kuppusamy, Saranya; Thavamani, Palanisami; Venkateswarlu, Kadiyala; Lee, Yong Bok; Naidu, Ravi; Megharaj, Mallavarapu

    2017-02-01

    For more than a decade, the primary focus of environmental experts has been to adopt risk-based management approaches to cleanup PAH polluted sites that pose potentially destructive ecological consequences. This focus had led to the development of several physical, chemical, thermal and biological technologies that are widely implementable. Established remedial options available for treating PAH contaminated soils are incineration, thermal conduction, solvent extraction/soil washing, chemical oxidation, bioaugmentation, biostimulation, phytoremediation, composting/biopiles and bioreactors. Integrating physico-chemical and biological technologies is also widely practiced for better cleanup of PAH contaminated soils. Electrokinetic remediation, vermiremediation and biocatalyst assisted remediation are still at the development stage. Though several treatment methods to remediate PAH polluted soils currently exist, a comprehensive overview of all the available remediation technologies to date is necessary so that the right technology for field-level success is chosen. The objective of this review is to provide a critical overview in this respect, focusing only on the treatment options available for field soils and ignoring the spiked ones. The authors also propose the development of novel multifunctional green and sustainable systems like mixed cell culture system, biosurfactant flushing, transgenic approaches and nanoremediation in order to overcome the existing soil- contaminant- and microbial-associated technological limitations in tackling high molecular weight PAHs. The ultimate objective is to ensure the successful remediation of long-term PAH contaminated soils. Copyright © 2016 Elsevier Ltd. All rights reserved.

  13. Risk-based economic decision analysis of remediation options at a PCE-contaminated site.

    PubMed

    Lemming, Gitte; Friis-Hansen, Peter; Bjerg, Poul L

    2010-05-01

    Remediation methods for contaminated sites cover a wide range of technical solutions with different remedial efficiencies and costs. Additionally, they may vary in their secondary impacts on the environment i.e. the potential impacts generated due to emissions and resource use caused by the remediation activities. More attention is increasingly being given to these secondary environmental impacts when evaluating remediation options. This paper presents a methodology for an integrated economic decision analysis which combines assessments of remediation costs, health risk costs and potential environmental costs. The health risks costs are associated with the residual contamination left at the site and its migration to groundwater used for drinking water. A probabilistic exposure model using first- and second-order reliability methods (FORM/SORM) is used to estimate the contaminant concentrations at a downstream groundwater well. Potential environmental impacts on the local, regional and global scales due to the site remediation activities are evaluated using life cycle assessments (LCA). The potential impacts on health and environment are converted to monetary units using a simplified cost model. A case study based upon the developed methodology is presented in which the following remediation scenarios are analyzed and compared: (a) no action, (b) excavation and off-site treatment of soil, (c) soil vapor extraction and (d) thermally enhanced soil vapor extraction by electrical heating of the soil. Ultimately, the developed methodology facilitates societal cost estimations of remediation scenarios which can be used for internal ranking of the analyzed options. Despite the inherent uncertainties of placing a value on health and environmental impacts, the presented methodology is believed to be valuable in supporting decisions on remedial interventions. Copyright 2010 Elsevier Ltd. All rights reserved.

  14. 24 CFR 3.110 - Remedial and affirmative action and self-evaluation.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 24 Housing and Urban Development 1 2011-04-01 2011-04-01 false Remedial and affirmative action and... ACTIVITIES RECEIVING FEDERAL FINANCIAL ASSISTANCE Introduction § 3.110 Remedial and affirmative action and... discrimination. (b) Affirmative action. In the absence of a finding of discrimination on the basis of sex in an...

  15. 24 CFR 146.47 - Remedial and affirmative action by recipients.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 24 Housing and Urban Development 1 2011-04-01 2011-04-01 false Remedial and affirmative action by... Remedial and affirmative action by recipients. (a) Where the Secretary finds that a recipient has... action. (b) Even in the absence of a finding of discrimination, a recipient may take affirmative action...

  16. 24 CFR 3.110 - Remedial and affirmative action and self-evaluation.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 24 Housing and Urban Development 1 2010-04-01 2010-04-01 false Remedial and affirmative action and... ACTIVITIES RECEIVING FEDERAL FINANCIAL ASSISTANCE Introduction § 3.110 Remedial and affirmative action and... discrimination. (b) Affirmative action. In the absence of a finding of discrimination on the basis of sex in an...

  17. 24 CFR 146.47 - Remedial and affirmative action by recipients.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 24 Housing and Urban Development 1 2010-04-01 2010-04-01 false Remedial and affirmative action by... Remedial and affirmative action by recipients. (a) Where the Secretary finds that a recipient has... action. (b) Even in the absence of a finding of discrimination, a recipient may take affirmative action...

  18. Development, Discouragement, or Diversion? New Evidence on the Effects of College Remediation Policy

    ERIC Educational Resources Information Center

    Scott-Clayton, Judith; Rodriguez, Olga

    2015-01-01

    Half of all college students will enroll in remedial coursework but evidence of its effectiveness is mixed. Using a regression-discontinuity design with data from a large urban community college system, we make three contributions. First, we articulate three alternative hypotheses regarding the potential impacts of remediation. Second, in addition…

  19. Science, policy, and stakeholders: developing a consensus science plan for Amchitka Island, Aleutians, Alaska.

    PubMed

    Burger, Joanna; Gochfeld, Michael; Kosson, David S; Powers, Charles W; Friedlander, Barry; Eichelberger, John; Barnes, David; Duffy, Lawrence K; Jewett, Stephen C; Volz, Conrad D

    2005-05-01

    With the ending of the Cold War, the US Department of Energy is responsible for the remediation of radioactive waste and disposal of land no longer needed for nuclear material production or related national security missions. The task of characterizing the hazards and risks from radionuclides is necessary for assuring the protection of health of humans and the environment. This is a particularly daunting task for those sites that had underground testing of nuclear weapons, where the radioactive contamination is currently inaccessible. Herein we report on the development of a Science Plan to characterize the physical and biological marine environment around Amchitka Island in the Aleutian chain of Alaska, where three underground nuclear tests were conducted (1965-1971). Information on the ecology, geology, and current radionuclide levels in biota, water, and sediment is necessary for evaluating possible current contamination and to serve as a baseline for developing a plan to ensure human and ecosystem health in perpetuity. Other information required includes identifying the location of the salt water/fresh water interface where migration to the ocean might occur in the future and determining groundwater recharge balances, as well as assessing other physical/geological features of Amchitka near the test sites. The Science Plan is needed to address the confusing and conflicting information available to the public about radionuclide risks from underground nuclear blasts in the late 1960s and early 1970s, as well as the potential for volcanic or seismic activity to disrupt shot cavities or accelerate migration of radionuclides into the sea. Developing a Science Plan involved agreement among regulators and other stakeholders, assignment of the task to the Consortium for Risk Evaluation with Stakeholder Participation, and development of a consensus Science Plan that dealt with contentious scientific issues. Involvement of the regulators (State of Alaska), resource trustees (U S Fish and Wildlife Service), representatives of the Aleut and Pribilof Island communities, and other stakeholders was essential for plan development and approval, although this created tensions because of the different objectives of each group. The complicated process of developing a Science Plan involved iterations and interactions with multiple agencies and organizations, scientists in several disciplines, regulators, and the participation of Aleut people in their home communities, as well as the general public. The importance of including all parties in all phases of the development of the Science Plan was critical to its acceptance by a broad range of regulators, agencies, resource trustees, Aleutian/Pribilof communities, and other stakeholders.

  20. Health and safety plan for the Environmental Restoration Program at Oak Ridge National Laboratory

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Clark, C. Jr.; Burman, S.N.; Cipriano, D.J. Jr.

    1994-08-01

    This Programmatic Health and Safety plan (PHASP) is prepared for the U.S. Department of Energy (DOE) Oak Ridge National Laboratory (ORNL) Environmental Restoration (ER) Program. This plan follows the format recommended by the U.S. Environmental Protection Agency (EPA) for remedial investigations and feasibility studies and that recommended by the EM40 Health and Safety Plan (HASP) Guidelines (DOE February 1994). This plan complies with the Occupational Safety and Health Administration (OSHA) requirements found in 29 CFR 1910.120 and EM-40 guidelines for any activities dealing with hazardous waste operations and emergency response efforts and with OSHA requirements found in 29 CFR 1926.65.more » The policies and procedures in this plan apply to all Environmental Restoration sites and activities including employees of Energy Systems, subcontractors, and prime contractors performing work for the DOE ORNL ER Program. The provisions of this plan are to be carried out whenever activities are initiated that could be a threat to human health or the environment. This plan implements a policy and establishes criteria for the development of procedures for day-to-day operations to prevent or minimize any adverse impact to the environment and personnel safety and health and to meet standards that define acceptable management of hazardous and radioactive materials and wastes. The plan is written to utilize past experience and best management practices to minimize hazards to human health and safety and to the environment from event such as fires, explosions, falls, mechanical hazards, or any unplanned release of hazardous or radioactive materials to air, soil, or surface water.« less

Top