Sample records for developing cost estimates

  1. Estimating the cost of major ongoing cost plus hardware development programs

    NASA Technical Reports Server (NTRS)

    Bush, J. C.

    1990-01-01

    Approaches are developed for forecasting the cost of major hardware development programs while these programs are in the design and development C/D phase. Three approaches are developed: a schedule assessment technique for bottom-line summary cost estimation, a detailed cost estimation approach, and an intermediate cost element analysis procedure. The schedule assessment technique was developed using historical cost/schedule performance data.

  2. COSTMODL: An automated software development cost estimation tool

    NASA Technical Reports Server (NTRS)

    Roush, George B.

    1991-01-01

    The cost of developing computer software continues to consume an increasing portion of many organizations' total budgets, both in the public and private sector. As this trend develops, the capability to produce reliable estimates of the effort and schedule required to develop a candidate software product takes on increasing importance. The COSTMODL program was developed to provide an in-house capability to perform development cost estimates for NASA software projects. COSTMODL is an automated software development cost estimation tool which incorporates five cost estimation algorithms including the latest models for the Ada language and incrementally developed products. The principal characteristic which sets COSTMODL apart from other software cost estimation programs is its capacity to be completely customized to a particular environment. The estimation equations can be recalibrated to reflect the programmer productivity characteristics demonstrated by the user's organization, and the set of significant factors which effect software development costs can be customized to reflect any unique properties of the user's development environment. Careful use of a capability such as COSTMODL can significantly reduce the risk of cost overruns and failed projects.

  3. Estimating Software-Development Costs With Greater Accuracy

    NASA Technical Reports Server (NTRS)

    Baker, Dan; Hihn, Jairus; Lum, Karen

    2008-01-01

    COCOMOST is a computer program for use in estimating software development costs. The goal in the development of COCOMOST was to increase estimation accuracy in three ways: (1) develop a set of sensitivity software tools that return not only estimates of costs but also the estimation error; (2) using the sensitivity software tools, precisely define the quantities of data needed to adequately tune cost estimation models; and (3) build a repository of software-cost-estimation information that NASA managers can retrieve to improve the estimates of costs of developing software for their project. COCOMOST implements a methodology, called '2cee', in which a unique combination of well-known pre-existing data-mining and software-development- effort-estimation techniques are used to increase the accuracy of estimates. COCOMOST utilizes multiple models to analyze historical data pertaining to software-development projects and performs an exhaustive data-mining search over the space of model parameters to improve the performances of effort-estimation models. Thus, it is possible to both calibrate and generate estimates at the same time. COCOMOST is written in the C language for execution in the UNIX operating system.

  4. Design and Implementation of an Intelligent Cost Estimation Model for Decision Support System Software

    DTIC Science & Technology

    1990-09-01

    following two chapters. 28 V. COCOMO MODEL A. OVERVIEW The COCOMO model which stands for COnstructive COst MOdel was developed by Barry Boehm and is...estimation model which uses an expert system to automate the Intermediate COnstructive Cost Estimation MOdel (COCOMO), developed by Barry W. Boehm and...cost estimation model which uses an expert system to automate the Intermediate COnstructive Cost Estimation MOdel (COCOMO), developed by Barry W

  5. Software Development Cost Estimation Executive Summary

    NASA Technical Reports Server (NTRS)

    Hihn, Jairus M.; Menzies, Tim

    2006-01-01

    Identify simple fully validated cost models that provide estimation uncertainty with cost estimate. Based on COCOMO variable set. Use machine learning techniques to determine: a) Minimum number of cost drivers required for NASA domain based cost models; b) Minimum number of data records required and c) Estimation Uncertainty. Build a repository of software cost estimation information. Coordinating tool development and data collection with: a) Tasks funded by PA&E Cost Analysis; b) IV&V Effort Estimation Task and c) NASA SEPG activities.

  6. Estimates and implications of the costs of compliance with biosafety regulations in developing countries.

    PubMed

    Falck-Zepeda, Jose; Yorobe, Jose; Husin, Bahagiawati Amir; Manalo, Abraham; Lokollo, Erna; Ramon, Godfrey; Zambrano, Patricia; Sutrisno

    2012-01-01

    Estimating the cost of compliance with biosafety regulations is important as it helps developers focus their investments in producer development. We provide estimates for the cost of compliance for a set of technologies in Indonesia, the Philippines and other countries. These costs vary from US $100,000 to 1.7 million. These are estimates of regulatory costs and do not include product development or deployment costs. Cost estimates need to be compared with potential gains when the technology is introduced in these countries and the gains in knowledge accumulate during the biosafety assessment process. Although the cost of compliance is important, time delays and uncertainty are even more important and may have an adverse impact on innovations reaching farmers.

  7. NASA Instrument Cost/Schedule Model

    NASA Technical Reports Server (NTRS)

    Habib-Agahi, Hamid; Mrozinski, Joe; Fox, George

    2011-01-01

    NASA's Office of Independent Program and Cost Evaluation (IPCE) has established a number of initiatives to improve its cost and schedule estimating capabilities. 12One of these initiatives has resulted in the JPL developed NASA Instrument Cost Model. NICM is a cost and schedule estimator that contains: A system level cost estimation tool; a subsystem level cost estimation tool; a database of cost and technical parameters of over 140 previously flown remote sensing and in-situ instruments; a schedule estimator; a set of rules to estimate cost and schedule by life cycle phases (B/C/D); and a novel tool for developing joint probability distributions for cost and schedule risk (Joint Confidence Level (JCL)). This paper describes the development and use of NICM, including the data normalization processes, data mining methods (cluster analysis, principal components analysis, regression analysis and bootstrap cross validation), the estimating equations themselves and a demonstration of the NICM tool suite.

  8. Taking the Evolutionary Road to Developing an In-House Cost Estimate

    NASA Technical Reports Server (NTRS)

    Jacintho, David; Esker, Lind; Herman, Frank; Lavaque, Rodolfo; Regardie, Myma

    2011-01-01

    This slide presentation reviews the process and some of the problems and challenges of developing an In-House Cost Estimate (IHCE). Using as an example the Space Network Ground Segment Sustainment (SGSS) project, the presentation reviews the phases for developing a Cost estimate within the project to estimate government and contractor project costs to support a budget request.

  9. Cost analysis of life sciences experiments and subsystems. [to be carried in the Spacelab

    NASA Technical Reports Server (NTRS)

    Yakut, M. M.

    1975-01-01

    Cost estimates for experiments and subsystems flown in the Spacelab were established. Ten experiments were cost analyzed. Estimated cost varied from $650,000 for the hardware development of the SPE water electrolysis experiment to $78,500,000 for the development and operation of a representative life sciences laboratory program. The cost of subsystems for thermal, atmospheric and trace contaminants control of the Spacelab internal atmosphere was also estimated. Subsystem cost estimates were based on the utilization of existing components developed in previous space programs whenever necessary.

  10. Cost estimating methods for advanced space systems

    NASA Technical Reports Server (NTRS)

    Cyr, Kelley

    1988-01-01

    Parametric cost estimating methods for space systems in the conceptual design phase are developed. The approach is to identify variables that drive cost such as weight, quantity, development culture, design inheritance, and time. The relationship between weight and cost is examined in detail. A theoretical model of cost is developed and tested statistically against a historical data base of major research and development programs. It is concluded that the technique presented is sound, but that it must be refined in order to produce acceptable cost estimates.

  11. Estimating Development Cost of an Interactive Website Based Cancer Screening Promotion Program

    PubMed Central

    Lairson, David R.; Chung, Tong Han; Smith, Lisa G.; Springston, Jeffrey K.; Champion, Victoria L.

    2015-01-01

    Objectives The aim of this study was to estimate the initial development costs for an innovative talk show format tailored intervention delivered via the interactive web, for increasing cancer screening in women 50 to 75 who were non-adherent to screening guidelines for colorectal cancer and/or breast cancer. Methods The cost of the intervention development was estimated from a societal perspective. Micro costing methods plus vendor contract costs were used to estimate cost. Staff logs were used to track personnel time. Non-personnel costs include all additional resources used to produce the intervention. Results Development cost of the interactive web based intervention was $.39 million, of which 77% was direct cost. About 98% of the cost was incurred in personnel time cost, contract cost and overhead cost. Conclusions The new web-based disease prevention medium required substantial investment in health promotion and media specialist time. The development cost was primarily driven by the high level of human capital required. The cost of intervention development is important information for assessing and planning future public and private investments in web-based health promotion interventions. PMID:25749548

  12. NASA Software Cost Estimation Model: An Analogy Based Estimation Model

    NASA Technical Reports Server (NTRS)

    Hihn, Jairus; Juster, Leora; Menzies, Tim; Mathew, George; Johnson, James

    2015-01-01

    The cost estimation of software development activities is increasingly critical for large scale integrated projects such as those at DOD and NASA especially as the software systems become larger and more complex. As an example MSL (Mars Scientific Laboratory) developed at the Jet Propulsion Laboratory launched with over 2 million lines of code making it the largest robotic spacecraft ever flown (Based on the size of the software). Software development activities are also notorious for their cost growth, with NASA flight software averaging over 50% cost growth. All across the agency, estimators and analysts are increasingly being tasked to develop reliable cost estimates in support of program planning and execution. While there has been extensive work on improving parametric methods there is very little focus on the use of models based on analogy and clustering algorithms. In this paper we summarize our findings on effort/cost model estimation and model development based on ten years of software effort estimation research using data mining and machine learning methods to develop estimation models based on analogy and clustering. The NASA Software Cost Model performance is evaluated by comparing it to COCOMO II, linear regression, and K-­ nearest neighbor prediction model performance on the same data set.

  13. Pros, Cons, and Alternatives to Weight Based Cost Estimating

    NASA Technical Reports Server (NTRS)

    Joyner, Claude R.; Lauriem, Jonathan R.; Levack, Daniel H.; Zapata, Edgar

    2011-01-01

    Many cost estimating tools use weight as a major parameter in projecting the cost. This is often combined with modifying factors such as complexity, technical maturity of design, environment of operation, etc. to increase the fidelity of the estimate. For a set of conceptual designs, all meeting the same requirements, increased weight can be a major driver in increased cost. However, once a design is fixed, increased weight generally decreases cost, while decreased weight generally increases cost - and the relationship is not linear. Alternative approaches to estimating cost without using weight (except perhaps for materials costs) have been attempted to try to produce a tool usable throughout the design process - from concept studies through development. This paper will address the pros and cons of using weight based models for cost estimating, using liquid rocket engines as the example. It will then examine approaches that minimize the impct of weight based cost estimating. The Rocket Engine- Cost Model (RECM) is an attribute based model developed internally by Pratt & Whitney Rocketdyne for NASA. RECM will be presented primarily to show a successful method to use design and programmatic parameters instead of weight to estimate both design and development costs and production costs. An operations model developed by KSC, the Launch and Landing Effects Ground Operations model (LLEGO), will also be discussed.

  14. Commercial Crew Cost Estimating - A Look at Estimating Processes, Challenges and Lessons Learned

    NASA Technical Reports Server (NTRS)

    Battle, Rick; Cole, Lance

    2015-01-01

    To support annual PPBE budgets and NASA HQ requests for cost information for commercial crew transportation to the International Space Station (ISS), the NASA ISS ACES team developed system development and per flight cost estimates for the potential providers for each annual PPBE submit from 2009-2014. This paper describes the cost estimating processes used, challenges and lessons learned to develop estimates for this key NASA project that diverted from the traditional procurement approach and used a new way of doing business

  15. Technology Estimating 2: A Process to Determine the Cost and Schedule of Space Technology Research and Development

    NASA Technical Reports Server (NTRS)

    Cole, Stuart K.; Wallace, Jon; Schaffer, Mark; May, M. Scott; Greenberg, Marc W.

    2014-01-01

    As a leader in space technology research and development, NASA is continuing in the development of the Technology Estimating process, initiated in 2012, for estimating the cost and schedule of low maturity technology research and development, where the Technology Readiness Level is less than TRL 6. NASA' s Technology Roadmap areas consist of 14 technology areas. The focus of this continuing Technology Estimating effort included four Technology Areas (TA): TA3 Space Power and Energy Storage, TA4 Robotics, TA8 Instruments, and TA12 Materials, to confine the research to the most abundant data pool. This research report continues the development of technology estimating efforts completed during 2013-2014, and addresses the refinement of parameters selected and recommended for use in the estimating process, where the parameters developed are applicable to Cost Estimating Relationships (CERs) used in the parametric cost estimating analysis. This research addresses the architecture for administration of the Technology Cost and Scheduling Estimating tool, the parameters suggested for computer software adjunct to any technology area, and the identification of gaps in the Technology Estimating process.

  16. Cost estimating methods for advanced space systems

    NASA Technical Reports Server (NTRS)

    Cyr, Kelley

    1994-01-01

    NASA is responsible for developing much of the nation's future space technology. Cost estimates for new programs are required early in the planning process so that decisions can be made accurately. Because of the long lead times required to develop space hardware, the cost estimates are frequently required 10 to 15 years before the program delivers hardware. The system design in conceptual phases of a program is usually only vaguely defined and the technology used is so often state-of-the-art or beyond. These factors combine to make cost estimating for conceptual programs very challenging. This paper describes an effort to develop parametric cost estimating methods for space systems in the conceptual design phase. The approach is to identify variables that drive cost such as weight, quantity, development culture, design inheritance and time. The nature of the relationships between the driver variables and cost will be discussed. In particular, the relationship between weight and cost will be examined in detail. A theoretical model of cost will be developed and tested statistically against a historical database of major research and development projects.

  17. Space Tug Docking Study. Volume 5: Cost Analysis

    NASA Technical Reports Server (NTRS)

    1976-01-01

    The cost methodology, summary cost data, resulting cost estimates by Work Breakdown Structure (WBS), technical characteristics data, program funding schedules and the WBS for the costing are discussed. Cost estimates for two tasks of the study are reported. The first, developed cost estimates for design, development, test and evaluation (DDT&E) and theoretical first unit (TFU) at the component level (Level 7) for all items reported in the data base. Task B developed total subsystem DDT&E costs and funding schedules for the three candidate Rendezvous and Docking Systems: manual, autonomous, and hybrid.

  18. Process-based Cost Estimation for Ramjet/Scramjet Engines

    NASA Technical Reports Server (NTRS)

    Singh, Brijendra; Torres, Felix; Nesman, Miles; Reynolds, John

    2003-01-01

    Process-based cost estimation plays a key role in effecting cultural change that integrates distributed science, technology and engineering teams to rapidly create innovative and affordable products. Working together, NASA Glenn Research Center and Boeing Canoga Park have developed a methodology of process-based cost estimation bridging the methodologies of high-level parametric models and detailed bottoms-up estimation. The NASA GRC/Boeing CP process-based cost model provides a probabilistic structure of layered cost drivers. High-level inputs characterize mission requirements, system performance, and relevant economic factors. Design alternatives are extracted from a standard, product-specific work breakdown structure to pre-load lower-level cost driver inputs and generate the cost-risk analysis. As product design progresses and matures the lower level more detailed cost drivers can be re-accessed and the projected variation of input values narrowed, thereby generating a progressively more accurate estimate of cost-risk. Incorporated into the process-based cost model are techniques for decision analysis, specifically, the analytic hierarchy process (AHP) and functional utility analysis. Design alternatives may then be evaluated not just on cost-risk, but also user defined performance and schedule criteria. This implementation of full-trade study support contributes significantly to the realization of the integrated development environment. The process-based cost estimation model generates development and manufacturing cost estimates. The development team plans to expand the manufacturing process base from approximately 80 manufacturing processes to over 250 processes. Operation and support cost modeling is also envisioned. Process-based estimation considers the materials, resources, and processes in establishing cost-risk and rather depending on weight as an input, actually estimates weight along with cost and schedule.

  19. Price and cost estimation

    NASA Technical Reports Server (NTRS)

    Stewart, R. D.

    1979-01-01

    Price and Cost Estimating Program (PACE II) was developed to prepare man-hour and material cost estimates. Versatile and flexible tool significantly reduces computation time and errors and reduces typing and reproduction time involved in preparation of cost estimates.

  20. Parametric cost estimation for space science missions

    NASA Astrophysics Data System (ADS)

    Lillie, Charles F.; Thompson, Bruce E.

    2008-07-01

    Cost estimation for space science missions is critically important in budgeting for successful missions. The process requires consideration of a number of parameters, where many of the values are only known to a limited accuracy. The results of cost estimation are not perfect, but must be calculated and compared with the estimates that the government uses for budgeting purposes. Uncertainties in the input parameters result from evolving requirements for missions that are typically the "first of a kind" with "state-of-the-art" instruments and new spacecraft and payload technologies that make it difficult to base estimates on the cost histories of previous missions. Even the cost of heritage avionics is uncertain due to parts obsolescence and the resulting redesign work. Through experience and use of industry best practices developed in participation with the Aerospace Industries Association (AIA), Northrop Grumman has developed a parametric modeling approach that can provide a reasonably accurate cost range and most probable cost for future space missions. During the initial mission phases, the approach uses mass- and powerbased cost estimating relationships (CER)'s developed with historical data from previous missions. In later mission phases, when the mission requirements are better defined, these estimates are updated with vendor's bids and "bottoms- up", "grass-roots" material and labor cost estimates based on detailed schedules and assigned tasks. In this paper we describe how we develop our CER's for parametric cost estimation and how they can be applied to estimate the costs for future space science missions like those presented to the Astronomy & Astrophysics Decadal Survey Study Committees.

  1. Cost Benefit Analysis: Cost Benefit Analysis for Human Effectiveness Research: Bioacoustic Protection

    DTIC Science & Technology

    2001-07-21

    APPENDIX A. ACRONYMS ACCES Attenuating Custom Communication Earpiece System ACEIT Automated Cost estimating Integrated Tools AFSC Air Force...documented in the ACEIT cost estimating tool developed by Tecolote, Inc. The factor used was 14 percent of PMP. 1.3 System Engineering/ Program...The data source is the ASC Aeronautical Engineering Products Cost Factor Handbook which is documented in the ACEIT cost estimating tool developed

  2. A Survey of Cost Estimating Methodologies for Distributed Spacecraft Missions

    NASA Technical Reports Server (NTRS)

    Foreman, Veronica L.; Le Moigne, Jacqueline; de Weck, Oliver L.

    2016-01-01

    Satellite constellations and Distributed Spacecraft Mission (DSM) architectures offer unique benefits to Earth observation scientists and unique challenges to cost estimators. The Cost and Risk (CR) module of the Tradespace Analysis Tool for Constellations (TAT-C) being developed by NASA Goddard seeks to address some of these challenges by providing a new approach to cost modeling, which aggregates existing Cost Estimating Relationships (CER) from respected sources, cost estimating best practices, and data from existing and proposed satellite designs. Cost estimation through this tool is approached from two perspectives: parametric cost estimating relationships and analogous cost estimation techniques. The dual approach utilized within the TAT-C CR module is intended to address prevailing concerns regarding early design stage cost estimates, and offer increased transparency and fidelity by offering two preliminary perspectives on mission cost. This work outlines the existing cost model, details assumptions built into the model, and explains what measures have been taken to address the particular challenges of constellation cost estimating. The risk estimation portion of the TAT-C CR module is still in development and will be presented in future work. The cost estimate produced by the CR module is not intended to be an exact mission valuation, but rather a comparative tool to assist in the exploration of the constellation design tradespace. Previous work has noted that estimating the cost of satellite constellations is difficult given that no comprehensive model for constellation cost estimation has yet been developed, and as such, quantitative assessment of multiple spacecraft missions has many remaining areas of uncertainty. By incorporating well-established CERs with preliminary approaches to approaching these uncertainties, the CR module offers more complete approach to constellation costing than has previously been available to mission architects or Earth scientists seeking to leverage the capabilities of multiple spacecraft working in support of a common goal.

  3. M-X Environmental Technical Report. Economic Model.

    DTIC Science & Technology

    1980-12-22

    TABLE PAGE C-4. Estimated off base school facility costs. 147 C-5. Estimated development costs to other public facilities. 148 C-6. Estimated utility... development costs. 149 C-7. Estimated non-residential building development . 151 E-1. Adjustments to baseline population projections to account for...the fringes of the rural deployment areas themselves. These metropolitan areas potentially would experience significant indirect employment growth as a

  4. Cost estimating methods for advanced space systems

    NASA Technical Reports Server (NTRS)

    Cyr, Kelley

    1988-01-01

    The development of parametric cost estimating methods for advanced space systems in the conceptual design phase is discussed. The process of identifying variables which drive cost and the relationship between weight and cost are discussed. A theoretical model of cost is developed and tested using a historical data base of research and development projects.

  5. Weight and cost forecasting for advanced manned space vehicles

    NASA Technical Reports Server (NTRS)

    Williams, Raymond

    1989-01-01

    A mass and cost estimating computerized methology for predicting advanced manned space vehicle weights and costs was developed. The user friendly methology designated MERCER (Mass Estimating Relationship/Cost Estimating Relationship) organizes the predictive process according to major vehicle subsystem levels. Design, development, test, evaluation, and flight hardware cost forecasting is treated by the study. This methodology consists of a complete set of mass estimating relationships (MERs) which serve as the control components for the model and cost estimating relationships (CERs) which use MER output as input. To develop this model, numerous MER and CER studies were surveyed and modified where required. Additionally, relationships were regressed from raw data to accommodate the methology. The models and formulations which estimated the cost of historical vehicles to within 20 percent of the actual cost were selected. The result of the research, along with components of the MERCER Program, are reported. On the basis of the analysis, the following conclusions were established: (1) The cost of a spacecraft is best estimated by summing the cost of individual subsystems; (2) No one cost equation can be used for forecasting the cost of all spacecraft; (3) Spacecraft cost is highly correlated with its mass; (4) No study surveyed contained sufficient formulations to autonomously forecast the cost and weight of the entire advanced manned vehicle spacecraft program; (5) No user friendly program was found that linked MERs with CERs to produce spacecraft cost; and (6) The group accumulation weight estimation method (summing the estimated weights of the various subsystems) proved to be a useful method for finding total weight and cost of a spacecraft.

  6. Estimating the Cost to do a Cost Estimate

    NASA Technical Reports Server (NTRS)

    Remer, D. S.; Buchanan, H. R.

    1998-01-01

    This article provides a model for estimating the cost required to do a cost estimate. Overruns may lead to concellation of a project. In 1991, we completed a study on the cost of doing cost estimates for the class of projects normally encountered in the development and implementation of equipment at the network of tracking stations operated by the Jet Propulsion Laboratory (JPL) for NASA.

  7. Statistical Cost Estimation in Higher Education: Some Alternatives.

    ERIC Educational Resources Information Center

    Brinkman, Paul T.; Niwa, Shelley

    Recent developments in econometrics that are relevant to the task of estimating costs in higher education are reviewed. The relative effectiveness of alternative statistical procedures for estimating costs are also tested. Statistical cost estimation involves three basic parts: a model, a data set, and an estimation procedure. Actual data are used…

  8. The price of innovation: new estimates of drug development costs.

    PubMed

    DiMasi, Joseph A; Hansen, Ronald W; Grabowski, Henry G

    2003-03-01

    The research and development costs of 68 randomly selected new drugs were obtained from a survey of 10 pharmaceutical firms. These data were used to estimate the average pre-tax cost of new drug development. The costs of compounds abandoned during testing were linked to the costs of compounds that obtained marketing approval. The estimated average out-of-pocket cost per new drug is 403 million US dollars (2000 dollars). Capitalizing out-of-pocket costs to the point of marketing approval at a real discount rate of 11% yields a total pre-approval cost estimate of 802 million US dollars (2000 dollars). When compared to the results of an earlier study with a similar methodology, total capitalized costs were shown to have increased at an annual rate of 7.4% above general price inflation. Copyright 2003 Elsevier Science B.V.

  9. Streamlining the Design Tradespace for Earth Imaging Constellations

    NASA Technical Reports Server (NTRS)

    Nag, Sreeja; Hughes, Steven P.; Le Moigne, Jacqueline J.

    2016-01-01

    Satellite constellations and Distributed Spacecraft Mission (DSM) architectures offer unique benefits to Earth observation scientists and unique challenges to cost estimators. The Cost and Risk (CR) module of the Tradespace Analysis Tool for Constellations (TAT-C) being developed by NASA Goddard seeks to address some of these challenges by providing a new approach to cost modeling, which aggregates existing Cost Estimating Relationships (CER) from respected sources, cost estimating best practices, and data from existing and proposed satellite designs. Cost estimation through this tool is approached from two perspectives: parametric cost estimating relationships and analogous cost estimation techniques. The dual approach utilized within the TAT-C CR module is intended to address prevailing concerns regarding early design stage cost estimates, and offer increased transparency and fidelity by offering two preliminary perspectives on mission cost. This work outlines the existing cost model, details assumptions built into the model, and explains what measures have been taken to address the particular challenges of constellation cost estimating. The risk estimation portion of the TAT-C CR module is still in development and will be presented in future work. The cost estimate produced by the CR module is not intended to be an exact mission valuation, but rather a comparative tool to assist in the exploration of the constellation design tradespace. Previous work has noted that estimating the cost of satellite constellations is difficult given that no comprehensive model for constellation cost estimation has yet been developed, and as such, quantitative assessment of multiple spacecraft missions has many remaining areas of uncertainty. By incorporating well-established CERs with preliminary approaches to approaching these uncertainties, the CR module offers more complete approach to constellation costing than has previously been available to mission architects or Earth scientists seeking to leverage the capabilities of multiple spacecraft working in support of a common goal.

  10. A Survey of Cost Estimating Methodologies for Distributed Spacecraft Missions

    NASA Technical Reports Server (NTRS)

    Foreman, Veronica; Le Moigne, Jacqueline; de Weck, Oliver

    2016-01-01

    Satellite constellations present unique capabilities and opportunities to Earth orbiting and near-Earth scientific and communications missions, but also present new challenges to cost estimators. An effective and adaptive cost model is essential to successful mission design and implementation, and as Distributed Spacecraft Missions (DSM) become more common, cost estimating tools must become more representative of these types of designs. Existing cost models often focus on a single spacecraft and require extensive design knowledge to produce high fidelity estimates. Previous research has examined the shortcomings of existing cost practices as they pertain to the early stages of mission formulation, for both individual satellites and small satellite constellations. Recommendations have been made for how to improve the cost models for individual satellites one-at-a-time, but much of the complexity in constellation and DSM cost modeling arises from constellation systems level considerations that have not yet been examined. This paper constitutes a survey of the current state-of-the-art in cost estimating techniques with recommendations for improvements to increase the fidelity of future constellation cost estimates. To enable our investigation, we have developed a cost estimating tool for constellation missions. The development of this tool has revealed three high-priority weaknesses within existing parametric cost estimating capabilities as they pertain to DSM architectures: design iteration, integration and test, and mission operations. Within this paper we offer illustrative examples of these discrepancies and make preliminary recommendations for addressing them. DSM and satellite constellation missions are shifting the paradigm of space-based remote sensing, showing promise in the realms of Earth science, planetary observation, and various heliophysical applications. To fully reap the benefits of DSM technology, accurate and relevant cost estimating capabilities must exist; this paper offers insights critical to the future development and implementation of DSM cost estimating tools.

  11. A Survey of Cost Estimating Methodologies for Distributed Spacecraft Missions

    NASA Technical Reports Server (NTRS)

    Foreman, Veronica L.; Le Moigne, Jacqueline; de Weck, Oliver

    2016-01-01

    Satellite constellations present unique capabilities and opportunities to Earth orbiting and near-Earth scientific and communications missions, but also present new challenges to cost estimators. An effective and adaptive cost model is essential to successful mission design and implementation, and as Distributed Spacecraft Missions (DSM) become more common, cost estimating tools must become more representative of these types of designs. Existing cost models often focus on a single spacecraft and require extensive design knowledge to produce high fidelity estimates. Previous research has examined the limitations of existing cost practices as they pertain to the early stages of mission formulation, for both individual satellites and small satellite constellations. Recommendations have been made for how to improve the cost models for individual satellites one-at-a-time, but much of the complexity in constellation and DSM cost modeling arises from constellation systems level considerations that have not yet been examined. This paper constitutes a survey of the current state-of-theart in cost estimating techniques with recommendations for improvements to increase the fidelity of future constellation cost estimates. To enable our investigation, we have developed a cost estimating tool for constellation missions. The development of this tool has revealed three high-priority shortcomings within existing parametric cost estimating capabilities as they pertain to DSM architectures: design iteration, integration and test, and mission operations. Within this paper we offer illustrative examples of these discrepancies and make preliminary recommendations for addressing them. DSM and satellite constellation missions are shifting the paradigm of space-based remote sensing, showing promise in the realms of Earth science, planetary observation, and various heliophysical applications. To fully reap the benefits of DSM technology, accurate and relevant cost estimating capabilities must exist; this paper offers insights critical to the future development and implementation of DSM cost estimating tools.

  12. Innovation in the pharmaceutical industry: New estimates of R&D costs.

    PubMed

    DiMasi, Joseph A; Grabowski, Henry G; Hansen, Ronald W

    2016-05-01

    The research and development costs of 106 randomly selected new drugs were obtained from a survey of 10 pharmaceutical firms. These data were used to estimate the average pre-tax cost of new drug and biologics development. The costs of compounds abandoned during testing were linked to the costs of compounds that obtained marketing approval. The estimated average out-of-pocket cost per approved new compound is $1395 million (2013 dollars). Capitalizing out-of-pocket costs to the point of marketing approval at a real discount rate of 10.5% yields a total pre-approval cost estimate of $2558 million (2013 dollars). When compared to the results of the previous study in this series, total capitalized costs were shown to have increased at an annual rate of 8.5% above general price inflation. Adding an estimate of post-approval R&D costs increases the cost estimate to $2870 million (2013 dollars). Copyright © 2016 Elsevier B.V. All rights reserved.

  13. Lost productivity due to premature mortality in developed and emerging countries: an application to smoking cessation.

    PubMed

    Menzin, Joseph; Marton, Jeno P; Menzin, Jordan A; Willke, Richard J; Woodward, Rebecca M; Federico, Victoria

    2012-06-25

    Researchers and policy makers have determined that accounting for productivity costs, or "indirect costs," may be as important as including direct medical expenditures when evaluating the societal value of health interventions. These costs are also important when estimating the global burden of disease. The estimation of indirect costs is commonly done on a country-specific basis. However, there are few studies that evaluate indirect costs across countries using a consistent methodology. Using the human capital approach, we developed a model that estimates productivity costs as the present value of lifetime earnings (PVLE) lost due to premature mortality. Applying this methodology, the model estimates productivity costs for 29 selected countries, both developed and emerging. We also provide an illustration of how the inclusion of productivity costs contributes to an analysis of the societal burden of smoking. A sensitivity analysis is undertaken to assess productivity costs on the basis of the friction cost approach. PVLE estimates were higher for certain subpopulations, such as men, younger people, and people in developed countries. In the case study, productivity cost estimates from our model showed that productivity loss was a substantial share of the total cost burden of premature mortality due to smoking, accounting for over 75 % of total lifetime costs in the United States and 67 % of total lifetime costs in Brazil. Productivity costs were much lower using the friction cost approach among those of working age. Our PVLE model is a novel tool allowing researchers to incorporate the value of lost productivity due to premature mortality into economic analyses of treatments for diseases or health interventions. We provide PVLE estimates for a number of emerging and developed countries. Including productivity costs in a health economics study allows for a more comprehensive analysis, and, as demonstrated by our illustration, can have important effects on the results and conclusions.

  14. Lost productivity due to premature mortality in developed and emerging countries: an application to smoking cessation

    PubMed Central

    2012-01-01

    Background Researchers and policy makers have determined that accounting for productivity costs, or “indirect costs,” may be as important as including direct medical expenditures when evaluating the societal value of health interventions. These costs are also important when estimating the global burden of disease. The estimation of indirect costs is commonly done on a country-specific basis. However, there are few studies that evaluate indirect costs across countries using a consistent methodology. Methods Using the human capital approach, we developed a model that estimates productivity costs as the present value of lifetime earnings (PVLE) lost due to premature mortality. Applying this methodology, the model estimates productivity costs for 29 selected countries, both developed and emerging. We also provide an illustration of how the inclusion of productivity costs contributes to an analysis of the societal burden of smoking. A sensitivity analysis is undertaken to assess productivity costs on the basis of the friction cost approach. Results PVLE estimates were higher for certain subpopulations, such as men, younger people, and people in developed countries. In the case study, productivity cost estimates from our model showed that productivity loss was a substantial share of the total cost burden of premature mortality due to smoking, accounting for over 75 % of total lifetime costs in the United States and 67 % of total lifetime costs in Brazil. Productivity costs were much lower using the friction cost approach among those of working age. Conclusions Our PVLE model is a novel tool allowing researchers to incorporate the value of lost productivity due to premature mortality into economic analyses of treatments for diseases or health interventions. We provide PVLE estimates for a number of emerging and developed countries. Including productivity costs in a health economics study allows for a more comprehensive analysis, and, as demonstrated by our illustration, can have important effects on the results and conclusions. PMID:22731620

  15. A non-stationary cost-benefit analysis approach for extreme flood estimation to explore the nexus of 'Risk, Cost and Non-stationarity'

    NASA Astrophysics Data System (ADS)

    Qi, Wei

    2017-11-01

    Cost-benefit analysis is commonly used for engineering planning and design problems in practice. However, previous cost-benefit based design flood estimation is based on stationary assumption. This study develops a non-stationary cost-benefit based design flood estimation approach. This approach integrates a non-stationary probability distribution function into cost-benefit analysis, and influence of non-stationarity on expected total cost (including flood damage and construction costs) and design flood estimation can be quantified. To facilitate design flood selections, a 'Risk-Cost' analysis approach is developed, which reveals the nexus of extreme flood risk, expected total cost and design life periods. Two basins, with 54-year and 104-year flood data respectively, are utilized to illustrate the application. It is found that the developed approach can effectively reveal changes of expected total cost and extreme floods in different design life periods. In addition, trade-offs are found between extreme flood risk and expected total cost, which reflect increases in cost to mitigate risk. Comparing with stationary approaches which generate only one expected total cost curve and therefore only one design flood estimation, the proposed new approach generate design flood estimation intervals and the 'Risk-Cost' approach selects a design flood value from the intervals based on the trade-offs between extreme flood risk and expected total cost. This study provides a new approach towards a better understanding of the influence of non-stationarity on expected total cost and design floods, and could be beneficial to cost-benefit based non-stationary design flood estimation across the world.

  16. Estimating Airline Operating Costs

    NASA Technical Reports Server (NTRS)

    Maddalon, D. V.

    1978-01-01

    The factors affecting commercial aircraft operating and delay costs were used to develop an airline operating cost model which includes a method for estimating the labor and material costs of individual airframe maintenance systems. The model permits estimates of aircraft related costs, i.e., aircraft service, landing fees, flight attendants, and control fees. A method for estimating the costs of certain types of airline delay is also described.

  17. 14 CFR 151.24 - Procedures: Application; information on estimated project costs.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... estimated project costs. 151.24 Section 151.24 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION... Development Projects § 151.24 Procedures: Application; information on estimated project costs. (a) If any part of the estimated project costs consists of the value of donated land, labor, materials, or equipment...

  18. 14 CFR 151.24 - Procedures: Application; information on estimated project costs.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... estimated project costs. 151.24 Section 151.24 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION... Development Projects § 151.24 Procedures: Application; information on estimated project costs. (a) If any part of the estimated project costs consists of the value of donated land, labor, materials, or equipment...

  19. 14 CFR 151.24 - Procedures: Application; information on estimated project costs.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... estimated project costs. 151.24 Section 151.24 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION... Development Projects § 151.24 Procedures: Application; information on estimated project costs. (a) If any part of the estimated project costs consists of the value of donated land, labor, materials, or equipment...

  20. 14 CFR 151.24 - Procedures: Application; information on estimated project costs.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... estimated project costs. 151.24 Section 151.24 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION... Development Projects § 151.24 Procedures: Application; information on estimated project costs. (a) If any part of the estimated project costs consists of the value of donated land, labor, materials, or equipment...

  1. 14 CFR 151.24 - Procedures: Application; information on estimated project costs.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... estimated project costs. 151.24 Section 151.24 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION... Development Projects § 151.24 Procedures: Application; information on estimated project costs. (a) If any part of the estimated project costs consists of the value of donated land, labor, materials, or equipment...

  2. Development of a Cost Estimation Process for Human Systems Integration Practitioners During the Analysis of Alternatives

    DTIC Science & Technology

    2010-12-01

    processes. Novice estimators must often use of these complicated cost estimation tools (e.g., ACEIT , SEER-H, SEER-S, PRICE-H, PRICE-S, etc.) until...However, the thesis will leverage the processes embedded in cost estimation tools such as the Automated Cost Estimating Integration Tool ( ACEIT ) and the

  3. Oil and gas pipeline construction cost analysis and developing regression models for cost estimation

    NASA Astrophysics Data System (ADS)

    Thaduri, Ravi Kiran

    In this study, cost data for 180 pipelines and 136 compressor stations have been analyzed. On the basis of the distribution analysis, regression models have been developed. Material, Labor, ROW and miscellaneous costs make up the total cost of a pipeline construction. The pipelines are analyzed based on different pipeline lengths, diameter, location, pipeline volume and year of completion. In a pipeline construction, labor costs dominate the total costs with a share of about 40%. Multiple non-linear regression models are developed to estimate the component costs of pipelines for various cross-sectional areas, lengths and locations. The Compressor stations are analyzed based on the capacity, year of completion and location. Unlike the pipeline costs, material costs dominate the total costs in the construction of compressor station, with an average share of about 50.6%. Land costs have very little influence on the total costs. Similar regression models are developed to estimate the component costs of compressor station for various capacities and locations.

  4. The Role of Inflation and Price Escalation Adjustments in Properly Estimating Program Costs: F-35 Case Study

    DTIC Science & Technology

    2016-04-30

    costs of new defense systems. An inappropriate price index can introduce errors in both development of cost estimating relationships ( CERs ) and in...indexes derived from CERs . These indexes isolate changes in price due to factors other than changes in quality over time. We develop a “Baseline” CER ...The hedonic index application has commonalities with cost estimating relationships ( CERs ), which also model system costs as a function of quality

  5. Government conceptual estimating for contracting and management

    NASA Technical Reports Server (NTRS)

    Brown, J. A.

    1986-01-01

    The use of the Aerospace Price Book, a cost index, and conceptual cost estimating for cost-effective design and construction of space facilities is discussed. The price book consists of over 200 commonly used conceptual elements and 100 systems summaries of projects such as launch pads, processing facilities, and air locks. The cost index is composed of three divisions: (1) bid summaries of major Shuttle projects, (2) budget cost data sheets, and (3) cost management summaries; each of these divisions is described. Conceptual estimates of facilities and ground support equipment are required to provide the most probable project cost for budget, funding, and project approval purposes. Similar buildings, systems, and elements already designed are located in the cost index in order to make the best rough order of magnitude conceptual estimates for development of Space Shuttle facilities. An example displaying the applicability of the conceptual cost estimating procedure for the development of the KSC facilities is presented.

  6. Cost estimation: An expert-opinion approach. [cost analysis of research projects using the Delphi method (forecasting)

    NASA Technical Reports Server (NTRS)

    Buffalano, C.; Fogleman, S.; Gielecki, M.

    1976-01-01

    A methodology is outlined which can be used to estimate the costs of research and development projects. The approach uses the Delphi technique a method developed by the Rand Corporation for systematically eliciting and evaluating group judgments in an objective manner. The use of the Delphi allows for the integration of expert opinion into the cost-estimating process in a consistent and rigorous fashion. This approach can also signal potential cost-problem areas. This result can be a useful tool in planning additional cost analysis or in estimating contingency funds. A Monte Carlo approach is also examined.

  7. Assessment of costs and benefits of flexible and alternative fuel use in the US transportation sector

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    1993-01-01

    The primary objective of this report is to provide estimates of volumes and development costs of known nonassociated gas reserves in selected, potentially important supplier nations, using a standard set of costing algorithms and conventions. Estimates of undeveloped nonassociated gas reserves and the cost of drilling development wells, production equipment, gas processing facilities, and pipeline construction are made at the individual field level. A discounted cash-flow model of production, investment, and expenses is used to estimate the present value cost of developing each field on a per-thousand-cubic-foot (Mcf) basis. These gas resource cost estimates for individual accumulations (that is, fieldsmore » or groups of fields) then were aggregated into country-specific price-quantity curves. These curves represent the cost of developing and transporting natural gas to an export point suitable for tanker shipments or to a junction with a transmission line. The additional costs of LNG or methanol conversion are not included. A brief summary of the cost of conversion to methanol and transportation to the United States is contained in Appendix D: Implications of Gas Development Costs for Methanol Conversion.« less

  8. Conceptual Cost Estimating

    NASA Technical Reports Server (NTRS)

    Brown, J. A.

    1983-01-01

    Kennedy Space Center data aid in efficient construction-cost managment. Report discusses development and use of NASA TR-1508, Kennedy Space Center Aerospace Construction price book for preparing conceptual budget, funding cost estimating, and preliminary cost engineering reports. Report based on actual bid prices and Government estimates.

  9. Analysis of Schedule Determination in Software Program Development and Software Development Estimation Models

    DTIC Science & Technology

    1988-09-01

    20 SLIM . . . . .e & . . . . . . . . . . . . 24 SoftCost-R . . . . . . . . . . . . . . . 26 SPQR /20 . . . . . . . . . . .*. . . . . 28...PRICB-8 . . . . . . . . . . .. . 83 softCost-R ............. 84 SPQR /20 . . . . . . . . . . . . 0 . 84 System-3 . . . . . . . . . . . . . . 85 Summry...128 Appendix G: SoftCost-R Input Values . . . . . . . . . . 129 Appendix H: SoftCost-R Resources Estimate . . . . . . . 131 Appendix I: SPQR

  10. The cost of drug development: a systematic review.

    PubMed

    Morgan, Steve; Grootendorst, Paul; Lexchin, Joel; Cunningham, Colleen; Greyson, Devon

    2011-04-01

    We aimed to systematically review and assess published estimates of the cost of developing new drugs. We sought English language research articles containing original estimates of the cost of drug development that were published from 1980 to 2009, inclusive. We searched seven databases and used citation tracing and expert referral to identify studies. We abstracted qualifying studies for information about methods, data sources, study samples, and key results. Thirteen articles were found to meet our inclusion criteria. Estimates of the cost of drug development ranged more than 9-fold, from USD$92 million cash (USD$161 million capitalized) to USD$883.6 million cash (USD$1.8 billion capitalized). Differences in methods, data sources, and time periods explain some of the variation in estimates. Lack of transparency limits many studies. Confidential information provided by unnamed companies about unspecified products forms all or part of the data underlying 10 of the 13 studies. Despite three decades of research in this area, no published estimate of the cost of developing a drug can be considered a gold standard. Studies on this topic should be subjected to reasonable audit and disclosure of - at the very least - the drugs which authors purport to provide development cost estimates for. Copyright © 2010 Elsevier Ireland Ltd. All rights reserved.

  11. Resource costing for multinational neurologic clinical trials: methods and results.

    PubMed

    Schulman, K; Burke, J; Drummond, M; Davies, L; Carlsson, P; Gruger, J; Harris, A; Lucioni, C; Gisbert, R; Llana, T; Tom, E; Bloom, B; Willke, R; Glick, H

    1998-11-01

    We present the results of a multinational resource costing study for a prospective economic evaluation of a new medical technology for treatment of subarachnoid hemorrhage within a clinical trial. The study describes a framework for the collection and analysis of international resource cost data that can contribute to a consistent and accurate intercountry estimation of cost. Of the 15 countries that participated in the clinical trial, we collected cost information in the following seven: Australia, France, Germany, the UK, Italy, Spain, and Sweden. The collection of cost data in these countries was structured through the use of worksheets to provide accurate and efficient cost reporting. We converted total average costs to average variable costs and then aggregated the data to develop study unit costs. When unit costs were unavailable, we developed an index table, based on a market-basket approach, to estimate unit costs. To estimate the cost of a given procedure, the market-basket estimation process required that cost information be available for at least one country. When cost information was unavailable in all countries for a given procedure, we estimated costs using a method based on physician-work and practice-expense resource-based relative value units. Finally, we converted study unit costs to a common currency using purchasing power parity measures. Through this costing exercise we developed a set of unit costs for patient services and per diem hospital services. We conclude by discussing the implications of our costing exercise and suggest guidelines to facilitate more effective multinational costing exercises.

  12. Development of regional stump-to-mill logging cost estimators

    Treesearch

    Chris B. LeDoux; John E. Baumgras

    1989-01-01

    Planning logging operations requires estimating the logging costs for the sale or tract being harvested. Decisions need to be made on equipment selection and its application to terrain. In this paper a methodology is described that has been developed and implemented to solve the problem of accurately estimating logging costs by region. The methodology blends field time...

  13. Space transfer vehicle concepts and requirements study. Volume 3, book 1: Program cost estimates

    NASA Technical Reports Server (NTRS)

    Peffley, Al F.

    1991-01-01

    The Space Transfer Vehicle (STV) Concepts and Requirements Study cost estimate and program planning analysis is presented. The cost estimating technique used to support STV system, subsystem, and component cost analysis is a mixture of parametric cost estimating and selective cost analogy approaches. The parametric cost analysis is aimed at developing cost-effective aerobrake, crew module, tank module, and lander designs with the parametric cost estimates data. This is accomplished using cost as a design parameter in an iterative process with conceptual design input information. The parametric estimating approach segregates costs by major program life cycle phase (development, production, integration, and launch support). These phases are further broken out into major hardware subsystems, software functions, and tasks according to the STV preliminary program work breakdown structure (WBS). The WBS is defined to a low enough level of detail by the study team to highlight STV system cost drivers. This level of cost visibility provided the basis for cost sensitivity analysis against various design approaches aimed at achieving a cost-effective design. The cost approach, methodology, and rationale are described. A chronological record of the interim review material relating to cost analysis is included along with a brief summary of the study contract tasks accomplished during that period of review and the key conclusions or observations identified that relate to STV program cost estimates. The STV life cycle costs are estimated on the proprietary parametric cost model (PCM) with inputs organized by a project WBS. Preliminary life cycle schedules are also included.

  14. Estimating age-based antiretroviral therapy costs for HIV-infected children in resource-limited settings based on World Health Organization weight-based dosing recommendations.

    PubMed

    Doherty, Kathleen; Essajee, Shaffiq; Penazzato, Martina; Holmes, Charles; Resch, Stephen; Ciaranello, Andrea

    2014-05-02

    Pediatric antiretroviral therapy (ART) has been shown to substantially reduce morbidity and mortality in HIV-infected infants and children. To accurately project program costs, analysts need accurate estimations of antiretroviral drug (ARV) costs for children. However, the costing of pediatric antiretroviral therapy is complicated by weight-based dosing recommendations which change as children grow. We developed a step-by-step methodology for estimating the cost of pediatric ARV regimens for children ages 0-13 years old. The costing approach incorporates weight-based dosing recommendations to provide estimated ARV doses throughout childhood development. Published unit drug costs are then used to calculate average monthly drug costs. We compared our derived monthly ARV costs to published estimates to assess the accuracy of our methodology. The estimates of monthly ARV costs are provided for six commonly used first-line pediatric ARV regimens, considering three possible care scenarios. The costs derived in our analysis for children were fairly comparable to or slightly higher than available published ARV drug or regimen estimates. The methodology described here can be used to provide an accurate estimation of pediatric ARV regimen costs for cost-effectiveness analysts to project the optimum packages of care for HIV-infected children, as well as for program administrators and budget analysts who wish to assess the feasibility of increasing pediatric ART availability in constrained budget environments.

  15. Methodology for Estimating Total Automotive Manufacturing Costs

    DOT National Transportation Integrated Search

    1983-04-01

    A number of methodologies for estimating manufacturing costs have been developed. This report discusses the different approaches and shows that an approach to estimating manufacturing costs in the automobile industry based on surrogate plants is pref...

  16. A model of the costs of community and nosocomial pediatric respiratory syncytial virus infections in Canadian hospitals

    PubMed Central

    Jacobs, Philip; Lier, Douglas; Gooch, Katherine; Buesch, Katharina; Lorimer, Michelle; Mitchell, Ian

    2013-01-01

    BACKGROUND: Approximately one in 10 hospitalized patients will acquire a nosocomial infection (NI) after admission to hospital, of which 71% are due to respiratory viruses, including the respiratory syncytial virus (RSV). NIs are concerning and lead to prolonged hospitalizations. The economics of NIs are typically described in generalized terms and specific cost data are lacking. OBJECTIVE: To develop an evidence-based model for predicting the risk and cost of nosocomial RSV infection in pediatric settings. METHODS: A model was developed, from a Canadian perspective, to capture all costs related to an RSV infection hospitalization, including the risk and cost of an NI, diagnostic testing and infection control. All data inputs were derived from published literature. Deterministic sensitivity analyses were performed to evaluate the uncertainty associated with the estimates and to explore the impact of changes to key variables. A probabilistic sensitivity analysis was performed to estimate a confidence interval for the overall cost estimate. RESULTS: The estimated cost of nosocomial RSV infection adds approximately 30.5% to the hospitalization costs for the treatment of community-acquired severe RSV infection. The net benefits of the prevention activities were estimated to be equivalent to 9% of the total RSV-related costs. Changes in the estimated hospital infection transmission rates did not have a significant impact on the base-case estimate. CONCLUSIONS: The risk and cost of nosocomial RSV infection contributes to the overall burden of RSV. The present model, which was developed to estimate this burden, can be adapted to other countries with different disease epidemiology, costs and hospital infection transmission rates. PMID:24421788

  17. Statistical methods of estimating mining costs

    USGS Publications Warehouse

    Long, K.R.

    2011-01-01

    Until it was defunded in 1995, the U.S. Bureau of Mines maintained a Cost Estimating System (CES) for prefeasibility-type economic evaluations of mineral deposits and estimating costs at producing and non-producing mines. This system had a significant role in mineral resource assessments to estimate costs of developing and operating known mineral deposits and predicted undiscovered deposits. For legal reasons, the U.S. Geological Survey cannot update and maintain CES. Instead, statistical tools are under development to estimate mining costs from basic properties of mineral deposits such as tonnage, grade, mineralogy, depth, strip ratio, distance from infrastructure, rock strength, and work index. The first step was to reestimate "Taylor's Rule" which relates operating rate to available ore tonnage. The second step was to estimate statistical models of capital and operating costs for open pit porphyry copper mines with flotation concentrators. For a sample of 27 proposed porphyry copper projects, capital costs can be estimated from three variables: mineral processing rate, strip ratio, and distance from nearest railroad before mine construction began. Of all the variables tested, operating costs were found to be significantly correlated only with strip ratio.

  18. Constellation Program Life-cycle Cost Analysis Model (LCAM)

    NASA Technical Reports Server (NTRS)

    Prince, Andy; Rose, Heidi; Wood, James

    2008-01-01

    The Constellation Program (CxP) is NASA's effort to replace the Space Shuttle, return humans to the moon, and prepare for a human mission to Mars. The major elements of the Constellation Lunar sortie design reference mission architecture are shown. Unlike the Apollo Program of the 1960's, affordability is a major concern of United States policy makers and NASA management. To measure Constellation affordability, a total ownership cost life-cycle parametric cost estimating capability is required. This capability is being developed by the Constellation Systems Engineering and Integration (SE&I) Directorate, and is called the Lifecycle Cost Analysis Model (LCAM). The requirements for LCAM are based on the need to have a parametric estimating capability in order to do top-level program analysis, evaluate design alternatives, and explore options for future systems. By estimating the total cost of ownership within the context of the planned Constellation budget, LCAM can provide Program and NASA management with the cost data necessary to identify the most affordable alternatives. LCAM is also a key component of the Integrated Program Model (IPM), an SE&I developed capability that combines parametric sizing tools with cost, schedule, and risk models to perform program analysis. LCAM is used in the generation of cost estimates for system level trades and analyses. It draws upon the legacy of previous architecture level cost models, such as the Exploration Systems Mission Directorate (ESMD) Architecture Cost Model (ARCOM) developed for Simulation Based Acquisition (SBA), and ATLAS. LCAM is used to support requirements and design trade studies by calculating changes in cost relative to a baseline option cost. Estimated costs are generally low fidelity to accommodate available input data and available cost estimating relationships (CERs). LCAM is capable of interfacing with the Integrated Program Model to provide the cost estimating capability for that suite of tools.

  19. A Project Management Approach to Using Simulation for Cost Estimation on Large, Complex Software Development Projects

    NASA Technical Reports Server (NTRS)

    Mizell, Carolyn; Malone, Linda

    2007-01-01

    It is very difficult for project managers to develop accurate cost and schedule estimates for large, complex software development projects. None of the approaches or tools available today can estimate the true cost of software with any high degree of accuracy early in a project. This paper provides an approach that utilizes a software development process simulation model that considers and conveys the level of uncertainty that exists when developing an initial estimate. A NASA project will be analyzed using simulation and data from the Software Engineering Laboratory to show the benefits of such an approach.

  20. Parametric CERs (Cost Estimate Relationships) for Replenishment Repair Parts (Selected U.S. Army Helicopters and Combat Vehicles)

    DTIC Science & Technology

    1989-07-31

    Information System (OSMIS). The long-range objective is to develop methods to determine total operating and support (O&S) costs within life-cycle cost...objective was to assess the feasibility of developing cost estimating relationships (CERs) based on data from the Army Operating and Support Management

  1. Assuring Software Cost Estimates: Is it an Oxymoron?

    NASA Technical Reports Server (NTRS)

    Hihn, Jarius; Tregre, Grant

    2013-01-01

    The software industry repeatedly observes cost growth of well over 100% even after decades of cost estimation research and well-known best practices, so "What's the problem?" In this paper we will provide an overview of the current state oj software cost estimation best practice. We then explore whether applying some of the methods used in software assurance might improve the quality of software cost estimates. This paper especially focuses on issues associated with model calibration, estimate review, and the development and documentation of estimates as part alan integrated plan.

  2. Automated Estimation Of Software-Development Costs

    NASA Technical Reports Server (NTRS)

    Roush, George B.; Reini, William

    1993-01-01

    COSTMODL is automated software development-estimation tool. Yields significant reduction in risk of cost overruns and failed projects. Accepts description of software product developed and computes estimates of effort required to produce it, calendar schedule required, and distribution of effort and staffing as function of defined set of development life-cycle phases. Written for IBM PC(R)-compatible computers.

  3. Spacecraft platform cost estimating relationships

    NASA Technical Reports Server (NTRS)

    Gruhl, W. M.

    1972-01-01

    The three main cost areas of unmanned satellite development are discussed. The areas are identified as: (1) the spacecraft platform (SCP), (2) the payload or experiments, and (3) the postlaunch ground equipment and operations. The SCP normally accounts for over half of the total project cost and accurate estimates of SCP costs are required early in project planning as a basis for determining total project budget requirements. The development of single formula SCP cost estimating relationships (CER) from readily available data by statistical linear regression analysis is described. The advantages of single formula CER are presented.

  4. Understanding cost growth during operations of planetary missions: An explanation of changes

    NASA Astrophysics Data System (ADS)

    McNeill, J. F.; Chapman, E. L.; Sklar, M. E.

    In the development of project cost estimates for interplanetary missions, considerable focus is generally given to the development of cost estimates for the development of ground, flight, and launch systems, i.e., Phases B, C, and D. Depending on the project team, efforts expended to develop cost estimates for operations (Phase E) may be relatively less rigorous than that devoted to estimates for ground and flight systems development. Furthermore, the project team may be challenged to develop a solid estimate of operations cost in the early stages of mission development, e.g., Concept Study Report or Systems Requirement Review (CSR/SRR), Preliminary Design Review (PDR), as mission specific peculiarities that impact cost may not be well understood. In addition, a methodology generally used to develop Phase E cost is engineering build-up, also known as “ grass roots” . Phase E can include cost and schedule risks that are not anticipated at the time of the major milestone reviews prior to launch. If not incorporated into the engineering build-up cost method for Phase E, this may translate into an estimation of the complexity of operations and overall cost estimates that are not mature and at worse, insufficient. As a result, projects may find themselves with thin reserves during cruise and on-orbit operations or project overruns prior to the end of mission. This paper examines a set of interplanetary missions in an effort to better understand the reasons for cost and staffing growth in Phase E. The method used in the study is discussed as well as the major findings summarized as the Phase E Explanation of Change (EoC). Research for the study entailed the review of project materials, including Estimates at Completion (EAC) for Phase E and staffing profiles, major project milestone reviews, e.g., CSR, PDR, Critical Design Review (CDR), the interviewing of select project and mission management, and review of Phase E replan materials. From this work, a detai- ed picture is constructed of why cost grew during the operations phase, even to the level of specific events in the life of the missions. As a next step, the Phase E EoC results were gleaned and synthesized to produce leading indicators, i.e., what may be identifiable signs of cost and staffing growth that may be present as early as PDR or CDR. Both a qualitative and quantitative approach was used to determine leading indicators. These leading indicators will be reviewed and a practical method for their use will be discussed.

  5. Development of cost estimation tools for total occupational safety and health activities and occupational health services: cost estimation from a corporate perspective.

    PubMed

    Nagata, Tomohisa; Mori, Koji; Aratake, Yutaka; Ide, Hiroshi; Ishida, Hiromi; Nobori, Junichiro; Kojima, Reiko; Odagami, Kiminori; Kato, Anna; Tsutsumi, Akizumi; Matsuda, Shinya

    2014-01-01

    The aim of the present study was to develop standardized cost estimation tools that provide information to employers about occupational safety and health (OSH) activities for effective and efficient decision making in Japanese companies. We interviewed OSH staff members including full-time professional occupational physicians to list all OSH activities. Using activity-based costing, cost data were obtained from retrospective analyses of occupational safety and health costs over a 1-year period in three manufacturing workplaces and were obtained from retrospective analyses of occupational health services costs in four manufacturing workplaces. We verified the tools additionally in four workplaces including service businesses. We created the OSH and occupational health standardized cost estimation tools. OSH costs consisted of personnel costs, expenses, outsourcing costs and investments for 15 OSH activities. The tools provided accurate, relevant information on OSH activities and occupational health services. The standardized information obtained from our OSH and occupational health cost estimation tools can be used to manage OSH costs, make comparisons of OSH costs between companies and organizations and help occupational health physicians and employers to determine the best course of action.

  6. Cost Estimation of Naval Ship Acquisition.

    DTIC Science & Technology

    1983-12-01

    one a 9-sub- system model , the other a single total cost model . The models were developed using the linear least squares regression tech- nique with...to Linear Statistical Models , McGraw-Hill, 1961. 11. Helmer, F. T., Bibliography on Pricing Methodology and Cost Estimating, Dept. of Economics and...SUPPI.EMSaTARY NOTES IS. KWRo" (Cowaft. en tever aide of ..aesep M’ Idab~t 6 Week ONNa.) Cost estimation; Acquisition; Parametric cost estimate; linear

  7. Estimating age-based antiretroviral therapy costs for HIV-infected children in resource-limited settings based on World Health Organization weight-based dosing recommendations

    PubMed Central

    2014-01-01

    Background Pediatric antiretroviral therapy (ART) has been shown to substantially reduce morbidity and mortality in HIV-infected infants and children. To accurately project program costs, analysts need accurate estimations of antiretroviral drug (ARV) costs for children. However, the costing of pediatric antiretroviral therapy is complicated by weight-based dosing recommendations which change as children grow. Methods We developed a step-by-step methodology for estimating the cost of pediatric ARV regimens for children ages 0–13 years old. The costing approach incorporates weight-based dosing recommendations to provide estimated ARV doses throughout childhood development. Published unit drug costs are then used to calculate average monthly drug costs. We compared our derived monthly ARV costs to published estimates to assess the accuracy of our methodology. Results The estimates of monthly ARV costs are provided for six commonly used first-line pediatric ARV regimens, considering three possible care scenarios. The costs derived in our analysis for children were fairly comparable to or slightly higher than available published ARV drug or regimen estimates. Conclusions The methodology described here can be used to provide an accurate estimation of pediatric ARV regimen costs for cost-effectiveness analysts to project the optimum packages of care for HIV-infected children, as well as for program administrators and budget analysts who wish to assess the feasibility of increasing pediatric ART availability in constrained budget environments. PMID:24885453

  8. PRELIMINARY COST ESTIMATES OF POLLUTION CONTROL TECHNOLOGIES FOR GEOTHERMAL DEVELOPMENTS

    EPA Science Inventory

    This report provides preliminary cost estimates of air and water pollution control technologies for geothermal energy conversion facilities. Costs for solid waste disposal are also estimated. The technologies examined include those for control of hydrogen sulfide emissions and fo...

  9. 76 FR 28820 - Submission for OMB Review; Comment Request

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-18

    ... estimated cost for an in-house attorney is $354 per hour and the estimated cost for an assistant compliance director in the securities industry is $320 per hour. Therefore the estimated total cost of compliance for... developing the required policies and procedures is no longer applicable. \\3\\ The total cost of compliance for...

  10. Outer planet probe cost estimates: First impressions

    NASA Technical Reports Server (NTRS)

    Niehoff, J.

    1974-01-01

    An examination was made of early estimates of outer planetary atmospheric probe cost by comparing the estimates with past planetary projects. Of particular interest is identification of project elements which are likely cost drivers for future probe missions. Data are divided into two parts: first, the description of a cost model developed by SAI for the Planetary Programs Office of NASA, and second, use of this model and its data base to evaluate estimates of probe costs. Several observations are offered in conclusion regarding the credibility of current estimates and specific areas of the outer planet probe concept most vulnerable to cost escalation.

  11. Estimating the Life Cycle Cost of Space Systems

    NASA Technical Reports Server (NTRS)

    Jones, Harry W.

    2015-01-01

    A space system's Life Cycle Cost (LCC) includes design and development, launch and emplacement, and operations and maintenance. Each of these cost factors is usually estimated separately. NASA uses three different parametric models for the design and development cost of crewed space systems; the commercial PRICE-H space hardware cost model, the NASA-Air Force Cost Model (NAFCOM), and the Advanced Missions Cost Model (AMCM). System mass is an important parameter in all three models. System mass also determines the launch and emplacement cost, which directly depends on the cost per kilogram to launch mass to Low Earth Orbit (LEO). The launch and emplacement cost is the cost to launch to LEO the system itself and also the rockets, propellant, and lander needed to emplace it. The ratio of the total launch mass to payload mass depends on the mission scenario and destination. The operations and maintenance costs include any material and spares provided, the ground control crew, and sustaining engineering. The Mission Operations Cost Model (MOCM) estimates these costs as a percentage of the system development cost per year.

  12. A Methodology for Developing Army Acquisition Strategies for an Uncertain Future

    DTIC Science & Technology

    2007-01-01

    manuscript for publication. Acronyms ABP Assumption-Based Planning ACEIT Automated Cost Estimating Integrated Tool ACR Armored Cavalry Regiment ACTD...decisions. For example, they employ the Automated Cost Estimating Integrated Tools ( ACEIT ) to simplify life cycle cost estimates; other tools are

  13. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Murphy, L.T.; Hickey, M.

    This paper summarizes the progress to date by CH2M HILL and the UKAEA in development of a parametric modelling capability for estimating the costs of large nuclear decommissioning projects in the United Kingdom (UK) and Europe. The ability to successfully apply parametric cost estimating techniques will be a key factor to commercial success in the UK and European multi-billion dollar waste management, decommissioning and environmental restoration markets. The most useful parametric models will be those that incorporate individual components representing major elements of work: reactor decommissioning, fuel cycle facility decommissioning, waste management facility decommissioning and environmental restoration. Models must bemore » sufficiently robust to estimate indirect costs and overheads, permit pricing analysis and adjustment, and accommodate the intricacies of international monetary exchange, currency fluctuations and contingency. The development of a parametric cost estimating capability is also a key component in building a forward estimating strategy. The forward estimating strategy will enable the preparation of accurate and cost-effective out-year estimates, even when work scope is poorly defined or as yet indeterminate. Preparation of cost estimates for work outside the organizations current sites, for which detailed measurement is not possible and historical cost data does not exist, will also be facilitated. (authors)« less

  14. NASA Air Force Cost Model (NAFCOM): Capabilities and Results

    NASA Technical Reports Server (NTRS)

    McAfee, Julie; Culver, George; Naderi, Mahmoud

    2011-01-01

    NAFCOM is a parametric estimating tool for space hardware. Uses cost estimating relationships (CERs) which correlate historical costs to mission characteristics to predict new project costs. It is based on historical NASA and Air Force space projects. It is intended to be used in the very early phases of a development project. NAFCOM can be used at the subsystem or component levels and estimates development and production costs. NAFCOM is applicable to various types of missions (crewed spacecraft, uncrewed spacecraft, and launch vehicles). There are two versions of the model: a government version that is restricted and a contractor releasable version.

  15. Space tug economic analysis study. Volume 3: Cost estimates

    NASA Technical Reports Server (NTRS)

    1972-01-01

    Cost estimates for the space tug operation are presented. The subjects discussed are: (1) research and development costs, (2) investment costs, (3) operations costs, and (4) funding requirements. The emphasis is placed on the single stage tug configuration using various types of liquid propellants.

  16. Predicting Costs of Eastern National Forest Wildernesses.

    ERIC Educational Resources Information Center

    Guldin, Richard W.

    1981-01-01

    A method for estimating the total direct social costs for proposed wilderness areas is presented. A cost framework is constructed and equations are developed for cost components. To illustrate the study's method, social costs are estimated for a proposed wilderness area in New England. (Author/JN)

  17. Weapon System Requirements: Detailed Systems Engineering Prior to Product Development Positions Programs for Success

    DTIC Science & Technology

    2016-11-01

    systems engineering had better outcomes. For example, the Small Diameter Bomb Increment I program, which delivered within cost and schedule estimates ...its current portfolio. This portfolio has experienced cost growth of 48 percent since first full estimates and average delays in delivering initial...stable design, building and testing of prototypes, and demonstration of mature production processes. • Realistic cost estimate : Sound cost estimates

  18. Systematic review of incremental non-vaccine cost estimates used in cost-effectiveness analysis on the introduction of rotavirus and pneumococcal vaccines.

    PubMed

    De la Hoz-Restrepo, Fernando; Castañeda-Orjuela, Carlos; Paternina, Angel; Alvis-Guzman, Nelson

    2013-07-02

    To review the approaches used in the cost-effectiveness analysis (CEAs) literature to estimate the cost of expanded program on immunization (EPI) activities, other than vaccine purchase, for rotavirus and pneumococcal vaccines. A systematic review in PubMed and NHS EED databases of rotavirus and pneumococcal vaccines CEAs was done. Selected articles were read and information on how EPI costs were calculated was extracted. EPI costing approaches were classified according to the method or assumption used for estimation. Seventy-nine studies that evaluated cost effectiveness of rotavirus (n=43) or pneumococcal (n=36) vaccines were identified. In general, there are few details on how EPI costs other than vaccine procurement were estimated. While 30 studies used some measurement of that cost, only one study on pneumococcal vaccine used a primary cost evaluation (bottom-up costing analysis) and one study used a costing tool. Twenty-seven studies (17 on rotavirus and 10 on pneumococcal vaccine) assumed the non-vaccine costs. Five studies made no reference to additional costs. Fourteen studies (9 rotavirus and 5 pneumococcal) did not consider any additional EPI cost beyond vaccine procurement. For rotavirus studies, the median for non-vaccine cost per dose was US$0.74 in developing countries and US$6.39 in developed countries. For pneumococcal vaccines, the median for non-vaccine cost per dose was US$1.27 in developing countries and US$8.71 in developed countries. Many pneumococcal (52.8%) and rotavirus (60.4%) cost-effectiveness analyses did not consider additional EPI costs or used poorly supported assumptions. Ignoring EPI costs in addition to those for vaccine procurement in CEA analysis of new vaccines may lead to significant errors in the estimations of ICERs since several factors like personnel, cold chain, or social mobilization can be substantially affected by the introduction of new vaccines. Copyright © 2013 Elsevier Ltd. All rights reserved.

  19. Manned Mars mission cost estimate

    NASA Technical Reports Server (NTRS)

    Hamaker, Joseph; Smith, Keith

    1986-01-01

    The potential costs of several options of a manned Mars mission are examined. A cost estimating methodology based primarily on existing Marshall Space Flight Center (MSFC) parametric cost models is summarized. These models include the MSFC Space Station Cost Model and the MSFC Launch Vehicle Cost Model as well as other modes and techniques. The ground rules and assumptions of the cost estimating methodology are discussed and cost estimates presented for six potential mission options which were studied. The estimated manned Mars mission costs are compared to the cost of the somewhat analogous Apollo Program cost after normalizing the Apollo cost to the environment and ground rules of the manned Mars missions. It is concluded that a manned Mars mission, as currently defined, could be accomplished for under $30 billion in 1985 dollars excluding launch vehicle development and mission operations.

  20. Estimating the Deep Space Network modification costs to prepare for future space missions by using major cost drivers

    NASA Technical Reports Server (NTRS)

    Remer, Donald S.; Sherif, Josef; Buchanan, Harry R.

    1993-01-01

    This paper develops a cost model to do long range planning cost estimates for Deep Space Network (DSN) support of future space missions. The paper focuses on the costs required to modify and/or enhance the DSN to prepare for future space missions. The model is a function of eight major mission cost drivers and estimates both the total cost and the annual costs of a similar future space mission. The model is derived from actual cost data from three space missions: Voyager (Uranus), Voyager (Neptune), and Magellan. Estimates derived from the model are tested against actual cost data for two independent missions, Viking and Mariner Jupiter/Saturn (MJS).

  1. National Stormwater Calculator: Low Impact Development ...

    EPA Pesticide Factsheets

    The National Stormwater Calculator (NSC) makes it easy to estimate runoff reduction when planning a new development or redevelopment site with low impact development (LID) stormwater controls. The Calculator is currently deployed as a Windows desktop application. The Calculator is organized as a wizard style application that walks the user through the steps necessary to perform runoff calculations on a single urban sub-catchment of 10 acres or less in size. Using an interactive map, the user can select the sub-catchment location and the Calculator automatically acquires hydrologic data for the site.A new LID cost estimation module has been developed for the Calculator. This project involved programming cost curves into the existing Calculator desktop application. The integration of cost components of LID controls into the Calculator increases functionality and will promote greater use of the Calculator as a stormwater management and evaluation tool. The addition of the cost estimation module allows planners and managers to evaluate LID controls based on comparison of project cost estimates and predicted LID control performance. Cost estimation is accomplished based on user-identified size (or auto-sizing based on achieving volume control or treatment of a defined design storm), configuration of the LID control infrastructure, and other key project and site-specific variables, including whether the project is being applied as part of new development or redevelopm

  2. The Psychology of Cost Estimating

    NASA Technical Reports Server (NTRS)

    Price, Andy

    2016-01-01

    Cost estimation for large (and even not so large) government programs is a challenge. The number and magnitude of cost overruns associated with large Department of Defense (DoD) and National Aeronautics and Space Administration (NASA) programs highlight the difficulties in developing and promulgating accurate cost estimates. These overruns can be the result of inadequate technology readiness or requirements definition, the whims of politicians or government bureaucrats, or even as failures of the cost estimating profession itself. However, there may be another reason for cost overruns that is right in front of us, but only recently have we begun to grasp it: the fact that cost estimators and their customers are human. The last 70+ years of research into human psychology and behavioral economics have yielded amazing findings into how we humans process and use information to make judgments and decisions. What these scientists have uncovered is surprising: humans are often irrational and illogical beings, making decisions based on factors such as emotion and perception, rather than facts and data. These built-in biases to our thinking directly affect how we develop our cost estimates and how those cost estimates are used. We cost estimators can use this knowledge of biases to improve our cost estimates and also to improve how we communicate and work with our customers. By understanding how our customers think, and more importantly, why they think the way they do, we can have more productive relationships and greater influence. By using psychology to our advantage, we can more effectively help the decision maker and our organizations make fact-based decisions.

  3. 47 CFR 54.803 - Universal service zones.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... developing this transitional estimate, the loop and port costs estimated by the FCC cost model, or other... chapter. (b) In a price cap study area where the price cap local exchange carrier has not established state-approved prices for UNE loops by zone, the Administrator shall develop an estimate of the local...

  4. 47 CFR 54.803 - Universal service zones.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... developing this transitional estimate, the loop and port costs estimated by the FCC cost model, or other... chapter. (b) In a price cap study area where the price cap local exchange carrier has not established state-approved prices for UNE loops by zone, the Administrator shall develop an estimate of the local...

  5. 47 CFR 54.803 - Universal service zones.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... developing this transitional estimate, the loop and port costs estimated by the FCC cost model, or other... chapter. (b) In a price cap study area where the price cap local exchange carrier has not established state-approved prices for UNE loops by zone, the Administrator shall develop an estimate of the local...

  6. 47 CFR 54.803 - Universal service zones.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... developing this transitional estimate, the loop and port costs estimated by the FCC cost model, or other... chapter. (b) In a price cap study area where the price cap local exchange carrier has not established state-approved prices for UNE loops by zone, the Administrator shall develop an estimate of the local...

  7. 47 CFR 54.803 - Universal service zones.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... developing this transitional estimate, the loop and port costs estimated by the FCC cost model, or other... chapter. (b) In a price cap study area where the price cap local exchange carrier has not established state-approved prices for UNE loops by zone, the Administrator shall develop an estimate of the local...

  8. The Role of Inflation and Price Escalation Adjustments in Properly Estimating Program Costs: F-35 Case Study

    DTIC Science & Technology

    2016-03-01

    regression models that yield hedonic price indexes is closely related to standard techniques for developing cost estimating relationships ( CERs ...October 2014). iii analysis) and derives a price index from the coefficients on variables reflecting the year of purchase. In CER development, the...index. The relevant cost metric in both cases is unit recurring flyaway (URF) costs. For the current project, we develop a “Baseline” CER model, taking

  9. Cost analysis of carbon dioxide concentrators

    NASA Technical Reports Server (NTRS)

    Yakut, M. M.

    1972-01-01

    A methodology is developed to predict the relevant contributions of the more intangible cost elements encountered in the development of flight-qualified hardware and is used to predict the costs of three carbon dioxide concentration systems. The cost and performance data from Gemini, Skylab, and other programs are utilized as a basis for establishing the cost estimating relationships. The concentration systems analyzed are the molecular sieves C02 concentrator, the hydrogen-depolarized concentrator, and the regenerable solid desiccant concentrator. Besides the cost estimates for each system, their comparative criteria including relative characteristics, operational differences, and development status are considered.

  10. Estimating airline operating costs

    NASA Technical Reports Server (NTRS)

    Maddalon, D. V.

    1978-01-01

    A review was made of the factors affecting commercial aircraft operating and delay costs. From this work, an airline operating cost model was developed which includes a method for estimating the labor and material costs of individual airframe maintenance systems. The model, similar in some respects to the standard Air Transport Association of America (ATA) Direct Operating Cost Model, permits estimates of aircraft-related costs not now included in the standard ATA model (e.g., aircraft service, landing fees, flight attendants, and control fees). A study of the cost of aircraft delay was also made and a method for estimating the cost of certain types of airline delay is described.

  11. KSC Construction Cost Index

    NASA Technical Reports Server (NTRS)

    Brown, J. A.

    1983-01-01

    Kennedy Space Center cost Index aids in conceptual design cost estimates. Report discusses development of KSC Cost Index since January 1974. Index since January 1974. Index provides management, design engineers, and estimators an up-to-data reference for local labor and material process. Also provides mount and rate of change in these costs used to predict future construction costs.

  12. Manual of phosphoric acid fuel cell power plant cost model and computer program

    NASA Technical Reports Server (NTRS)

    Lu, C. Y.; Alkasab, K. A.

    1984-01-01

    Cost analysis of phosphoric acid fuel cell power plant includes two parts: a method for estimation of system capital costs, and an economic analysis which determines the levelized annual cost of operating the system used in the capital cost estimation. A FORTRAN computer has been developed for this cost analysis.

  13. On a Formal Tool for Reasoning About Flight Software Cost Analysis

    NASA Technical Reports Server (NTRS)

    Spagnuolo, John N., Jr.; Stukes, Sherry A.

    2013-01-01

    A report focuses on the development of flight software (FSW) cost estimates for 16 Discovery-class missions at JPL. The techniques and procedures developed enabled streamlining of the FSW analysis process, and provided instantaneous confirmation that the data and processes used for these estimates were consistent across all missions. The research provides direction as to how to build a prototype rule-based system for FSW cost estimation that would provide (1) FSW cost estimates, (2) explanation of how the estimates were arrived at, (3) mapping of costs, (4) mathematical trend charts with explanations of why the trends are what they are, (5) tables with ancillary FSW data of interest to analysts, (6) a facility for expert modification/enhancement of the rules, and (7) a basis for conceptually convenient expansion into more complex, useful, and general rule-based systems.

  14. A simplified economic filter for open-pit mining and heap-leach recovery of copper in the United States

    USGS Publications Warehouse

    Long, Keith R.; Singer, Donald A.

    2001-01-01

    Determining the economic viability of mineral deposits of various sizes and grades is a critical task in all phases of mineral supply, from land-use management to mine development. This study evaluates two simple tools for estimating the economic viability of porphyry copper deposits mined by open-pit, heap-leach methods when only limited information on these deposits is available. These two methods are useful for evaluating deposits that either (1) are undiscovered deposits predicted by a mineral resource assessment, or (2) have been discovered but for which little data has been collected or released. The first tool uses ordinary least-squared regression analysis of cost and operating data from selected deposits to estimate a predictive relationship between mining rate, itself estimated from deposit size, and capital and operating costs. The second method uses cost models developed by the U.S. Bureau of Mines (Camm, 1991) updated using appropriate cost indices. We find that the cost model method works best for estimating capital costs and the empirical model works best for estimating operating costs for mines to be developed in the United States.

  15. An estimating rule for deep space station control room equipment energy costs

    NASA Technical Reports Server (NTRS)

    Younger, H. C.

    1980-01-01

    A rule is described which can be used to estimate power costs for new equipment under development, helping to reduce life-cycle costs and energy consumption by justifying design alternatives that are more costly, but more efficient.

  16. Systems engineering and integration: Cost estimation and benefits analysis

    NASA Technical Reports Server (NTRS)

    Dean, ED; Fridge, Ernie; Hamaker, Joe

    1990-01-01

    Space Transportation Avionics hardware and software cost has traditionally been estimated in Phase A and B using cost techniques which predict cost as a function of various cost predictive variables such as weight, lines of code, functions to be performed, quantities of test hardware, quantities of flight hardware, design and development heritage, complexity, etc. The output of such analyses has been life cycle costs, economic benefits and related data. The major objectives of Cost Estimation and Benefits analysis are twofold: (1) to play a role in the evaluation of potential new space transportation avionics technologies, and (2) to benefit from emerging technological innovations. Both aspects of cost estimation and technology are discussed here. The role of cost analysis in the evaluation of potential technologies should be one of offering additional quantitative and qualitative information to aid decision-making. The cost analyses process needs to be fully integrated into the design process in such a way that cost trades, optimizations and sensitivities are understood. Current hardware cost models tend to primarily use weights, functional specifications, quantities, design heritage and complexity as metrics to predict cost. Software models mostly use functionality, volume of code, heritage and complexity as cost descriptive variables. Basic research needs to be initiated to develop metrics more responsive to the trades which are required for future launch vehicle avionics systems. These would include cost estimating capabilities that are sensitive to technological innovations such as improved materials and fabrication processes, computer aided design and manufacturing, self checkout and many others. In addition to basic cost estimating improvements, the process must be sensitive to the fact that no cost estimate can be quoted without also quoting a confidence associated with the estimate. In order to achieve this, better cost risk evaluation techniques are needed as well as improved usage of risk data by decision-makers. More and better ways to display and communicate cost and cost risk to management are required.

  17. New geothermal site identification and qualification. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    2004-04-01

    This study identifies remaining undeveloped geothermal resources in California and western Nevada, and it estimates the development costs of each. It has relied on public-domain information and such additional data as geothermal developers have chosen to make available. Reserve estimation has been performed by volumetric analysis with a probabilistic approach to uncertain input parameters. Incremental geothermal reserves in the California/Nevada study area have a minimum value of 2,800 grosss MW and a most-likely value of 4,300 gross MW. For the state of California alone, these values are 2,000 and 3,000 gross MW, respectively. These estimates may be conservative to themore » extent that they do not take into account resources about which little or no public-domain information is available. The average capital cost of incremental generation capacity is estimated to average $3,100/kW for the California/Nevada study area, and $2,950/kW for the state of California alone. These cost estimates include exploration, confirmation drilling, development drilling, plant construction, and transmission-line costs. For the purposes of this study, a capital cost of $2,400/kW is considered competitive with other renewable resources. The amount of incremental geothermal capacity available at or below $2,400/kW is about 1,700 gross MW for the California/Nevada study area, and the same amount (within 50-MW rounding) for the state of California alone. The capital cost estimates are only approximate, because each developer would bring its own experience, bias, and opportunities to the development process. Nonetheless, the overall costs per project estimated in this study are believed to be reasonable.« less

  18. Cost estimators for construction of forest roads in the central Appalachians

    Treesearch

    Deborah, A. Layton; Chris O. LeDoux; Curt C. Hassler; Curt C. Hassler

    1992-01-01

    Regression equations were developed for estimating the total cost of road construction in the central Appalachian region. Estimators include methods for predicting total costs for roads constructed using hourly rental methods and roads built on a total-job bid basis. Results show that total-job bid roads cost up to five times as much as roads built than when equipment...

  19. Economic costs attributable to smoking in Hong Kong in 2011: a possible increase from 1998.

    PubMed

    Chen, Jing; McGhee, Sarah; Lam, Tai Hing

    2017-11-15

    Reduction in smoking prevalence does not necessarily reduce the costs of smoking as evidence shows in developed countries. We provide up-to-date estimates for direct and indirect costs attributable to smoking in Hong Kong in 2011 and compare with our 1998 estimates. We took a societal perspective to include lives and life years lost, health care costs and time lost from work in the costing. We followed guidelines on estimating costs of active smoking for those aged 35 years or above (35+) and costs due to SHS exposure for 35+, infants aged 12 months and under and children aged 15 and below. All costs are in US$. We estimated that 6154 deaths among 35+ in Hong Kong in 2011 were attributable to active smoking, an increase of 10% from 1998. Besides, 672 deaths were attributable to SHS exposure, i.e. 10% of the total 6826 smoking-attributable deaths. The estimate of productive life lost due to deaths from active smoking by those aged under 65 years in 2011 was $166 million, an increase of about 4% over the estimate in 1998. Our conservative estimate of the annual tobacco-related disease cost in 2011 was $716 million which accounted for 0.3% of GDP. If we added the value of attributable lives lost, the annual cost would be $4.7 billion. Despite the reduction in smoking prevalence, smoking-attributable disease still imposes a substantial economic burden on Hong Kong society. These findings support more stringent and effective tobacco control legislation, polices and measures. Current evidence shows reduction in smoking prevalence does not necessarily reduce the economic costs of smoking. Most studies in developed countries employed a societal perspective, including costs of productivity loss and indirect costs, but not all studies estimated costs associated with second-hand smoking (SHS). The present study estimated the total costs of smoking in Hong Kong including direct and indirect costs attributable to active smoking and to SHS exposure. Our study confirms the pattern of smoking epidemic in developed countries, forewarns the increasing economic burdens from tobacco, and provides East Asian countries with a prediction of their own future costs. © The Author 2017. Published by Oxford University Press on behalf of the Society for Research on Nicotine and Tobacco. All rights reserved. For permissions, please e-mail: journals.permissions@oup.com.

  20. Cost analysis of carbon dioxide concentrators

    NASA Technical Reports Server (NTRS)

    Yakut, M. M.

    1973-01-01

    Methodology and cost estimating relationships, for flight-type and prototype CO2 concentrators, have been developed and presented. A validity check was made by comparing the molecular sieves system considered here and that developed for Skylab. The system evaluated here is twice the size of the Skylab system and is also more complex as it desorbs CO2 thermally and stores it in an accumulator. The cost estimates developed were found to be approximately 50 to 70% higher than the actual cost of the Skylab unit.

  1. Estimating the cost of a smoking employee.

    PubMed

    Berman, Micah; Crane, Rob; Seiber, Eric; Munur, Mehmet

    2014-09-01

    We attempted to estimate the excess annual costs that a US private employer may attribute to employing an individual who smokes tobacco as compared to a non-smoking employee. Reviewing and synthesising previous literature estimating certain discrete costs associated with smoking employees, we developed a cost estimation approach that approximates the total of such costs for U.S. employers. We examined absenteeism, presenteesim, smoking breaks, healthcare costs and pension benefits for smokers. Our best estimate of the annual excess cost to employ a smoker is $5816. This estimate should be taken as a general indicator of the extent of excess costs, not as a predictive point value. Employees who smoke impose significant excess costs on private employers. The results of this study may help inform employer decisions about tobacco-related policies. Published by the BMJ Publishing Group Limited. For permission to use (where not already granted under a licence) please go to http://group.bmj.com/group/rights-licensing/permissions.

  2. Mars Rover/Sample Return - Phase A cost estimation

    NASA Technical Reports Server (NTRS)

    Stancati, Michael L.; Spadoni, Daniel J.

    1990-01-01

    This paper presents a preliminary cost estimate for the design and development of the Mars Rover/Sample Return (MRSR) mission. The estimate was generated using a modeling tool specifically built to provide useful cost estimates from design parameters of the type and fidelity usually available during early phases of mission design. The model approach and its application to MRSR are described.

  3. Developing and validating a highway construction project cost estimation tool.

    DOT National Transportation Integrated Search

    2004-01-01

    In May 2002, Virginia's Commonwealth Transportation Commissioner tasked his Chief of Technology, Research & Innovation with leading an effort to develop a definitive, consistent, and well-documented approach for estimating the cost of delivering cons...

  4. Implementation Costs for Educational Technology Systems. Issue Trak: A CEFPI Brief on Educational Facility Issues.

    ERIC Educational Resources Information Center

    Meeks, Glenn E.; Fisher, Ricki; Loveless, Warren

    Personnel involved in planning or developing schools lack the costing tools that will enable them to determine educational technology costs. This report presents an overview of the technology costing process and the general costs used in estimating educational technology systems on a macro-budget basis, along with simple cost estimates for…

  5. Cost and performance model for redox flow batteries

    NASA Astrophysics Data System (ADS)

    Viswanathan, Vilayanur; Crawford, Alasdair; Stephenson, David; Kim, Soowhan; Wang, Wei; Li, Bin; Coffey, Greg; Thomsen, Ed; Graff, Gordon; Balducci, Patrick; Kintner-Meyer, Michael; Sprenkle, Vincent

    2014-02-01

    A cost model is developed for all vanadium and iron-vanadium redox flow batteries. Electrochemical performance modeling is done to estimate stack performance at various power densities as a function of state of charge and operating conditions. This is supplemented with a shunt current model and a pumping loss model to estimate actual system efficiency. The operating parameters such as power density, flow rates and design parameters such as electrode aspect ratio and flow frame channel dimensions are adjusted to maximize efficiency and minimize capital costs. Detailed cost estimates are obtained from various vendors to calculate cost estimates for present, near-term and optimistic scenarios. The most cost-effective chemistries with optimum operating conditions for power or energy intensive applications are determined, providing a roadmap for battery management systems development for redox flow batteries. The main drivers for cost reduction for various chemistries are identified as a function of the energy to power ratio of the storage system. Levelized cost analysis further guide suitability of various chemistries for different applications.

  6. Costs of Chronic Diseases at the State Level: The Chronic Disease Cost Calculator

    PubMed Central

    Murphy, Louise B.; Khavjou, Olga A.; Li, Rui; Maylahn, Christopher M.; Tangka, Florence K.; Nurmagambetov, Tursynbek A.; Ekwueme, Donatus U.; Nwaise, Isaac; Chapman, Daniel P.; Orenstein, Diane

    2015-01-01

    Introduction Many studies have estimated national chronic disease costs, but state-level estimates are limited. The Centers for Disease Control and Prevention developed the Chronic Disease Cost Calculator (CDCC), which estimates state-level costs for arthritis, asthma, cancer, congestive heart failure, coronary heart disease, hypertension, stroke, other heart diseases, depression, and diabetes. Methods Using publicly available and restricted secondary data from multiple national data sets from 2004 through 2008, disease-attributable annual per-person medical and absenteeism costs were estimated. Total state medical and absenteeism costs were derived by multiplying per person costs from regressions by the number of people in the state treated for each disease. Medical costs were estimated for all payers and separately for Medicaid, Medicare, and private insurers. Projected medical costs for all payers (2010 through 2020) were calculated using medical costs and projected state population counts. Results Median state-specific medical costs ranged from $410 million (asthma) to $1.8 billion (diabetes); median absenteeism costs ranged from $5 million (congestive heart failure) to $217 million (arthritis). Conclusion CDCC provides methodologically rigorous chronic disease cost estimates. These estimates highlight possible areas of cost savings achievable through targeted prevention efforts or research into new interventions and treatments. PMID:26334712

  7. Early‐Stage Capital Cost Estimation of Biorefinery Processes: A Comparative Study of Heuristic Techniques

    PubMed Central

    Couturier, Jean‐Luc; Kokossis, Antonis; Dubois, Jean‐Luc

    2016-01-01

    Abstract Biorefineries offer a promising alternative to fossil‐based processing industries and have undergone rapid development in recent years. Limited financial resources and stringent company budgets necessitate quick capital estimation of pioneering biorefinery projects at the early stages of their conception to screen process alternatives, decide on project viability, and allocate resources to the most promising cases. Biorefineries are capital‐intensive projects that involve state‐of‐the‐art technologies for which there is no prior experience or sufficient historical data. This work reviews existing rapid cost estimation practices, which can be used by researchers with no previous cost estimating experience. It also comprises a comparative study of six cost methods on three well‐documented biorefinery processes to evaluate their accuracy and precision. The results illustrate discrepancies among the methods because their extrapolation on biorefinery data often violates inherent assumptions. This study recommends the most appropriate rapid cost methods and urges the development of an improved early‐stage capital cost estimation tool suitable for biorefinery processes. PMID:27484398

  8. CH-47F Improved Cargo Helicopter (CH-47F)

    DTIC Science & Technology

    2015-12-01

    Confidence Level Confidence Level of cost estimate for current APB: 50% The Confidence Level of the CH-47F APB cost estimate, which was approved on April...M) Initial PAUC Development Estimate Changes PAUC Production Estimate Econ Qty Sch Eng Est Oth Spt Total 10.316 -0.491 3.003 -0.164 2.273 7.378...SAR Baseline to Current SAR Baseline (TY $M) Initial APUC Development Estimate Changes APUC Production Estimate Econ Qty Sch Eng Est Oth Spt Total

  9. A quality-based cost model for new electronic systems and products

    NASA Astrophysics Data System (ADS)

    Shina, Sammy G.; Saigal, Anil

    1998-04-01

    This article outlines a method for developing a quality-based cost model for the design of new electronic systems and products. The model incorporates a methodology for determining a cost-effective design margin allocation for electronic products and systems and its impact on manufacturing quality and cost. A spreadsheet-based cost estimating tool was developed to help implement this methodology in order for the system design engineers to quickly estimate the effect of design decisions and tradeoffs on the quality and cost of new products. The tool was developed with automatic spreadsheet connectivity to current process capability and with provisions to consider the impact of capital equipment and tooling purchases to reduce the product cost.

  10. Concept designs for NASA's Solar Electric Propulsion Technology Demonstration Mission

    NASA Technical Reports Server (NTRS)

    Mcguire, Melissa L.; Hack, Kurt J.; Manzella, David H.; Herman, Daniel A.

    2014-01-01

    Multiple Solar Electric Propulsion Technology Demonstration Mission were developed to assess vehicle performance and estimated mission cost. Concepts ranged from a 10,000 kilogram spacecraft capable of delivering 4000 kilogram of payload to one of the Earth Moon Lagrange points in support of future human-crewed outposts to a 180 kilogram spacecraft capable of performing an asteroid rendezvous mission after launched to a geostationary transfer orbit as a secondary payload. Low-cost and maximum Delta-V capability variants of a spacecraft concept based on utilizing a secondary payload adapter as the primary bus structure were developed as were concepts designed to be co-manifested with another spacecraft on a single launch vehicle. Each of the Solar Electric Propulsion Technology Demonstration Mission concepts developed included an estimated spacecraft cost. These data suggest estimated spacecraft costs of $200 million - $300 million if 30 kilowatt-class solar arrays and the corresponding electric propulsion system currently under development are used as the basis for sizing the mission concept regardless of launch vehicle costs. The most affordable mission concept developed based on subscale variants of the advanced solar arrays and electric propulsion technology currently under development by the NASA Space Technology Mission Directorate has an estimated cost of $50M and could provide a Delta-V capability comparable to much larger spacecraft concepts.

  11. Estimation of the cost of using chemical protective clothing

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Schwope, A.D.; Renard, E.R.

    1993-01-01

    The U.S. Environmental Protection Agency, either directly or through its Superfund contractors, is a major user of chemical protective clothing. The purpose of the study was to develop estimates for the cost of using this clothing. These estimates can be used to guide purchase decisions and use practices. For example, economic guidelines would assist in decisions pertinent to single-use versus reusable clothing. Eight cost elements were considered: (1) purchase cost, (2) the number of times an item is used, (3) the number of items used per day, (4) cost of decontamination, (5) cost of inspection, (6) cost of maintenance, (7)more » cost of storage, and (8) cost of disposal. Estimates or assumed inputs for each of these elements were developed based on labor costs, fixed costs, and recurring costs. The cost elements were combined into an economic (mathematical) model having the single output of cost/use. By comparing cost/use for various use scenarios, conclusions are readily reached as to the optimum economics for purchase, use, and reuse of the clothing. In general, clothing should be considered disposable if its purchase cost is less than its average cost/use per use for the anticipated number of times it will be reused.« less

  12. An approach to software cost estimation

    NASA Technical Reports Server (NTRS)

    Mcgarry, F.; Page, J.; Card, D.; Rohleder, M.; Church, V.

    1984-01-01

    A general procedure for software cost estimation in any environment is outlined. The basic concepts of work and effort estimation are explained, some popular resource estimation models are reviewed, and the accuracy of source estimates is discussed. A software cost prediction procedure based on the experiences of the Software Engineering Laboratory in the flight dynamics area and incorporating management expertise, cost models, and historical data is described. The sources of information and relevant parameters available during each phase of the software life cycle are identified. The methodology suggested incorporates these elements into a customized management tool for software cost prediction. Detailed guidelines for estimation in the flight dynamics environment developed using this methodology are presented.

  13. An assessment of the costs and benefits of interventions aimed at improving rural community water supplies in developed countries.

    PubMed

    Hunter, Paul R; Pond, Kathy; Jagals, Paul; Cameron, John

    2009-06-01

    We report a cost benefit analyses (CBA) for water interventions in rural populations of developed country sub-regions. A Bayesian belief network was used to estimate the cost benefit ratio using Monte Carlo simulation. Where possible we used input data from recently published primary research or systematic reviews. Otherwise variables were derived from previous work in the peer-reviewed or grey literature. For these analyses we considered the situation of people with small and very small community supplies that may not be adequately managed. For the three developed country sub-regions Amr-A (America region A), Eur-A (European region A) and Wpr-A (Western Pacific region A), we estimate the costs of acute diarrhoeal illness associated with small community supplies to be U$4671 million (95% CI 1721-9592), the capital costs of intervention to be USD 13703 million (95% CI 6670-20735), additional annual maintenance to be USD 804 million (95%CI 359-1247) and the CB ratio to be 2.78 (95%CI 0.86-6.5). However, we also estimated the cost of post infectious irritable bowel syndrome (IBS) following drinking water-associated acute gastroenteritis to be USD 11896 million (95%CI 3118-22657). When the benefits of reduced IBS are added to the analysis the CB ratio increases to 9.87 (95%CI 3.34-20.49). The most important driver of uncertainty was the estimate of the cost of illness. However, there are very few good estimates of costs in improving management of small rural supplies in the literature. Investments in drinking-water provision in rural settings are highly cost beneficial in the developed world. In the developed world, the CB ratio is substantially positive especially once the impact of IBS is included.

  14. CUECost workbook development documentation

    EPA Science Inventory

    This is a user's manual for the Coal Utility Environmental Cost (CUECost) workbook to estimate installed capital and annualized costs. The CUECost workbook produces rough-order-of-magnitude (ROM) cost estimates (+/-30% accuracy) of the installed capital and annualized operating c...

  15. The hidden societal cost of antibiotic resistance per antibiotic prescribed in the United States: an exploratory analysis.

    PubMed

    Michaelidis, Constantinos I; Fine, Michael J; Lin, Chyongchiou Jeng; Linder, Jeffrey A; Nowalk, Mary Patricia; Shields, Ryan K; Zimmerman, Richard K; Smith, Kenneth J

    2016-11-08

    Ambulatory antibiotic prescribing contributes to the development of antibiotic resistance and increases societal costs. Here, we estimate the hidden societal cost of antibiotic resistance per antibiotic prescribed in the United States. In an exploratory analysis, we used published data to develop point and range estimates for the hidden societal cost of antibiotic resistance (SCAR) attributable to each ambulatory antibiotic prescription in the United States. We developed four estimation methods that focused on the antibiotic-resistance attributable costs of hospitalization, second-line inpatient antibiotic use, second-line outpatient antibiotic use, and antibiotic stewardship, then summed the estimates across all methods. The total SCAR attributable to each ambulatory antibiotic prescription was estimated to be $13 (range: $3-$95). The greatest contributor to the total SCAR was the cost of hospitalization ($9; 69 % of the total SCAR). The costs of second-line inpatient antibiotic use ($1; 8 % of the total SCAR), second-line outpatient antibiotic use ($2; 15 % of the total SCAR) and antibiotic stewardship ($1; 8 %). This apperars to be an error.; of the total SCAR) were modest contributors to the total SCAR. Assuming an average antibiotic cost of $20, the total SCAR attributable to each ambulatory antibiotic prescription would increase antibiotic costs by 65 % (range: 15-475 %) if incorporated into antibiotic costs paid by patients or payers. Each ambulatory antibiotic prescription is associated with a hidden SCAR that substantially increases the cost of an antibiotic prescription in the United States. This finding raises concerns regarding the magnitude of misalignment between individual and societal antibiotic costs.

  16. Key Aspects of the Federal Direct Loan Program's Cost Estimates: Department of Education. Report to Congressional Requesters.

    ERIC Educational Resources Information Center

    Calbom, Linda M.; Ashby, Cornelia M.

    Because of concerns about the Department of Education's reliance on estimates to project costs of the William D. Ford Federal Direct Loan Program (FDLP) and a lack of historical information on which to base those estimates, Congress asked the General Accounting Office (GAO) to review how the department develops its cost estimates for the program,…

  17. Cost-estimating relationships for space programs

    NASA Technical Reports Server (NTRS)

    Mandell, Humboldt C., Jr.

    1992-01-01

    Cost-estimating relationships (CERs) are defined and discussed as they relate to the estimation of theoretical costs for space programs. The paper primarily addresses CERs based on analogous relationships between physical and performance parameters to estimate future costs. Analytical estimation principles are reviewed examining the sources of errors in cost models, and the use of CERs is shown to be affected by organizational culture. Two paradigms for cost estimation are set forth: (1) the Rand paradigm for single-culture single-system methods; and (2) the Price paradigms that incorporate a set of cultural variables. For space programs that are potentially subject to even small cultural changes, the Price paradigms are argued to be more effective. The derivation and use of accurate CERs is important for developing effective cost models to analyze the potential of a given space program.

  18. Estimating the costs of human space exploration

    NASA Technical Reports Server (NTRS)

    Mandell, Humboldt C., Jr.

    1994-01-01

    The plan for NASA's new exploration initiative has the following strategic themes: (1) incremental, logical evolutionary development; (2) economic viability; and (3) excellence in management. The cost estimation process is involved with all of these themes and they are completely dependent upon the engineering cost estimator for success. The purpose is to articulate the issues associated with beginning this major new government initiative, to show how NASA intends to resolve them, and finally to demonstrate the vital importance of a leadership role by the cost estimation community.

  19. IDC Reengineering Phase 2 & 3 Rough Order of Magnitude (ROM) Cost Estimate Summary (Leveraged NDC Case).

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Harris, James M.; Prescott, Ryan; Dawson, Jericah M.

    2014-11-01

    Sandia National Laboratories has prepared a ROM cost estimate for budgetary planning for the IDC Reengineering Phase 2 & 3 effort, based on leveraging a fully funded, Sandia executed NDC Modernization project. This report provides the ROM cost estimate and describes the methodology, assumptions, and cost model details used to create the ROM cost estimate. ROM Cost Estimate Disclaimer Contained herein is a Rough Order of Magnitude (ROM) cost estimate that has been provided to enable initial planning for this proposed project. This ROM cost estimate is submitted to facilitate informal discussions in relation to this project and is NOTmore » intended to commit Sandia National Laboratories (Sandia) or its resources. Furthermore, as a Federally Funded Research and Development Center (FFRDC), Sandia must be compliant with the Anti-Deficiency Act and operate on a full-cost recovery basis. Therefore, while Sandia, in conjunction with the Sponsor, will use best judgment to execute work and to address the highest risks and most important issues in order to effectively manage within cost constraints, this ROM estimate and any subsequent approved cost estimates are on a 'full-cost recovery' basis. Thus, work can neither commence nor continue unless adequate funding has been accepted and certified by DOE.« less

  20. Parametric Cost Models for Space Telescopes

    NASA Technical Reports Server (NTRS)

    Stahl, H. Philip; Henrichs, Todd; Dollinger, Courtney

    2010-01-01

    Multivariable parametric cost models for space telescopes provide several benefits to designers and space system project managers. They identify major architectural cost drivers and allow high-level design trades. They enable cost-benefit analysis for technology development investment. And, they provide a basis for estimating total project cost. A survey of historical models found that there is no definitive space telescope cost model. In fact, published models vary greatly [1]. Thus, there is a need for parametric space telescopes cost models. An effort is underway to develop single variable [2] and multi-variable [3] parametric space telescope cost models based on the latest available data and applying rigorous analytical techniques. Specific cost estimating relationships (CERs) have been developed which show that aperture diameter is the primary cost driver for large space telescopes; technology development as a function of time reduces cost at the rate of 50% per 17 years; it costs less per square meter of collecting aperture to build a large telescope than a small telescope; and increasing mass reduces cost.

  1. Implementation of the ANNs ensembles in macro-BIM cost estimates of buildings' floor structural frames

    NASA Astrophysics Data System (ADS)

    Juszczyk, Michał

    2018-04-01

    This paper reports some results of the studies on the use of artificial intelligence tools for the purposes of cost estimation based on building information models. A problem of the cost estimates based on the building information models on a macro level supported by the ensembles of artificial neural networks is concisely discussed. In the course of the research a regression model has been built for the purposes of cost estimation of buildings' floor structural frames, as higher level elements. Building information models are supposed to serve as a repository of data used for the purposes of cost estimation. The core of the model is the ensemble of neural networks. The developed model allows the prediction of cost estimates with satisfactory accuracy.

  2. Lunar base scenario cost estimates: Lunar base systems study task 6.1

    NASA Technical Reports Server (NTRS)

    1988-01-01

    The projected development and production costs of each of the Lunar Base's systems are described and unit costs are estimated for transporting the systems to the lunar surface and for setting up the system.

  3. COST ESTIMATING EQUATIONS FOR BEST MANAGEMENT PRACTICES

    EPA Science Inventory

    This paper describes the development of an interactive internet-based cost-estimating tool for commonly used urban storm runoff best management practices (BMP), including: retention and detention ponds, grassed swales, and constructed wetlands. The paper presents the cost data, c...

  4. Parametric study of potential early commercial power plants Task 3-A MHD cost analysis

    NASA Technical Reports Server (NTRS)

    1983-01-01

    The development of costs for an MHD Power Plant and the comparison of these costs to a conventional coal fired power plant are reported. The program is divided into three activities: (1) code of accounts review; (2) MHD pulverized coal power plant cost comparison; (3) operating and maintenance cost estimates. The scope of each NASA code of account item was defined to assure that the recently completed Task 3 capital cost estimates are consistent with the code of account scope. Improvement confidence in MHD plant capital cost estimates by identifying comparability with conventional pulverized coal fired (PCF) power plant systems is undertaken. The basis for estimating the MHD plant operating and maintenance costs of electricity is verified.

  5. Pharmacologic treatments for dry eye: a worthwhile investment?

    PubMed

    Novack, Gary D

    2002-01-01

    To determine whether investment in a novel pharmacologic agent for the treatment of dry eye would be worthwhile from a financial perspective. Estimates were made of the cost and time required to develop a novel pharmacologic treatment of dry eye and the potential revenues for the product. These estimates were used to compute the value of the investment, adjusting for the time value of money. Development was estimated to cost $42 million and to take 55 months from investigational new drug exemption filing to new drug application approval. The potential market for this treatment was estimated at $542 million per year at year 5. Adding in the cost of development and marketing as well as other costs, net present value was very positive at the 5, 8, 10, and 40% cost of financing. The internal rate of return was 90%. In summary, if there were a successful pharmacologic treatment of dry eye and if a firm could manage the cash flow during the development, then the market potential approaches that of other treatment of chronic ophthalmic conditions (e.g., glaucoma), and it would be a worthwhile investment.

  6. Selected Tether Applications Cost Model

    NASA Technical Reports Server (NTRS)

    Keeley, Michael G.

    1988-01-01

    Diverse cost-estimating techniques and data combined into single program. Selected Tether Applications Cost Model (STACOM 1.0) is interactive accounting software tool providing means for combining several independent cost-estimating programs into fully-integrated mathematical model capable of assessing costs, analyzing benefits, providing file-handling utilities, and putting out information in text and graphical forms to screen, printer, or plotter. Program based on Lotus 1-2-3, version 2.0. Developed to provide clear, concise traceability and visibility into methodology and rationale for estimating costs and benefits of operations of Space Station tether deployer system.

  7. Area-Specific Marginal Costing for Electric Utilities: a Case Study of Transmission and Distribution Costs

    NASA Astrophysics Data System (ADS)

    Orans, Ren

    1990-10-01

    Existing procedures used to develop marginal costs for electric utilities were not designed for applications in an increasingly competitive market for electric power. The utility's value of receiving power, or the costs of selling power, however, depend on the exact location of the buyer or seller, the magnitude of the power and the period of time over which the power is used. Yet no electric utility in the United States has disaggregate marginal costs that reflect differences in costs due to the time, size or location of the load associated with their power or energy transactions. The existing marginal costing methods used by electric utilities were developed in response to the Public Utilities Regulatory Policy Act (PURPA) in 1978. The "ratemaking standards" (Title 1) established by PURPA were primarily concerned with the appropriate segmentation of total revenues to various classes-of-service, designing time-of-use rating periods, and the promotion of efficient long-term resource planning. By design, the methods were very simple and inexpensive to implement. Now, more than a decade later, the costing issues facing electric utilities are becoming increasingly complex, and the benefits of developing more specific marginal costs will outweigh the costs of developing this information in many cases. This research develops a framework for estimating total marginal costs that vary by the size, timing, and the location of changes in loads within an electric distribution system. To complement the existing work at the Electric Power Research Institute (EPRI) and Pacific Gas and Electric Company (PGandE) on estimating disaggregate generation and transmission capacity costs, this dissertation focuses on the estimation of distribution capacity costs. While the costing procedure is suitable for the estimation of total (generation, transmission and distribution) marginal costs, the empirical work focuses on the geographic disaggregation of marginal costs related to electric utility distribution investment. The study makes use of data from an actual distribution planning area, located within PGandE's service territory, to demonstrate the important characteristics of this new costing approach. The most significant result of this empirical work is that geographic differences in the cost of capacity in distribution systems can be as much as four times larger than the current system average utility estimates. Furthermore, lumpy capital investment patterns can lead to significant cost differences over time.

  8. Drug development costs when financial risk is measured using the Fama-French three-factor model.

    PubMed

    Vernon, John A; Golec, Joseph H; Dimasi, Joseph A

    2010-08-01

    In a widely cited article, DiMasi, Hansen, and Grabowski (2003) estimate the average pre-tax cost of bringing a new molecular entity to market. Their base case estimate, excluding post-marketing studies, was $802 million (in $US 2000). Strikingly, almost half of this cost (or $399 million) is the cost of capital (COC) used to fund clinical development expenses to the point of FDA marketing approval. The authors used an 11% real COC computed using the capital asset pricing model (CAPM). But the CAPM is a single factor risk model, and multi-factor risk models are the current state of the art in finance. Using the Fama-French three factor model we find that the cost of drug development to be higher than the earlier estimate. Copyright (c) 2009 John Wiley & Sons, Ltd.

  9. Tunnel and Station Cost Methodology : Mined Tunnels

    DOT National Transportation Integrated Search

    1983-01-01

    The main objective of this study was to develop a model for estimating the cost of subway station and tunnel construction. This report describes a cost estimating methodology for subway tunnels that can be used by planners, designers, owners, and gov...

  10. Tunnel and Station Cost Methodology Volume II: Stations

    DOT National Transportation Integrated Search

    1981-01-01

    The main objective of this study was to develop a model for estimating the cost of subway station and tunnel construction. This report describes a cost estimating methodology for subway tunnels that can be used by planners, designers, owners, and gov...

  11. COST ESTIMATING EQUATIONS FOR BEST MANAGEMENT PRACTICES (BMP)

    EPA Science Inventory

    This paper describes the development of an interactive internet-based cost-estimating tool for commonly used urban storm runoff best management practices (BMP), including: retention and detention ponds, grassed swales, and constructed wetlands. The paper presents the cost data, c...

  12. Oak Ridge Spallation Neutron Source (ORSNS) target station design integration

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    McManamy, T.; Booth, R.; Cleaves, J.

    1996-06-01

    The conceptual design for a 1- to 3-MW short pulse spallation source with a liquid mercury target has been started recently. The design tools and methods being developed to define requirements, integrate the work, and provide early cost guidance will be presented with a summary of the current target station design status. The initial design point was selected with performance and cost estimate projections by a systems code. This code was developed recently using cost estimates from the Brookhaven Pulsed Spallation Neutron Source study and experience from the Advanced Neutron Source Project`s conceptual design. It will be updated and improvedmore » as the design develops. Performance was characterized by a simplified figure of merit based on a ratio of neutron production to costs. A work breakdown structure was developed, with simplified systems diagrams used to define interfaces and system responsibilities. A risk assessment method was used to identify potential problems, to identify required research and development (R&D), and to aid contingency development. Preliminary 3-D models of the target station are being used to develop remote maintenance concepts and to estimate costs.« less

  13. Marginal Hospital Cost of Surgery-related Hospital-acquired Pressure Ulcers.

    PubMed

    Spector, William D; Limcangco, Rhona; Owens, Pamela L; Steiner, Claudia A

    2016-09-01

    Patients who develop hospital-acquired pressure ulcers (HAPUs) are more likely to die, have longer hospital stays, and are at greater risk of infections. Patients undergoing surgery are prone to developing pressure ulcers (PUs). To estimate the hospital marginal cost of a HAPU for adults patients who were hospitalized for major surgeries, adjusted for patient characteristics, comorbidities, procedures, and hospital characteristics. Data are from the Healthcare Cost and Utilization Project (HCUP) State Inpatient Databases and the Medicare Patient Safety Monitoring System for 2011 and 2012. PU information was obtained using retrospective structured record review from trained MPMS data abstractors. Costs are derived using HCUP hospital-specific cost-to-charge ratios. Marginal cost estimates were made using Extended Estimating Equations. We estimated the marginal cost at the 25th, 50th, and 75th percentiles of the cost distribution using Simultaneous Quantile Regression. We find that 3.5% of major surgical patients developed HAPUs and that the HAPUs added ∼$8200 to the cost of a surgical stay after adjusting for comorbidities, patient characteristics, procedures, and hospital characteristics. This is an ∼44% addition to the cost of a major surgical stay but less than half of the unadjusted cost difference. In addition, we find that for high-cost stays (75th percentile) HAPUs added ∼$12,100, whereas for low-cost stays (25th percentile) HAPUs added ∼$3900. This paper suggests that HAPUs add ∼44% to the cost of major surgical hospital stays, but the amount varies depending on the total cost of the visit.

  14. The Development of a Model for Estimating the Costs Associated with the Delivery of a Metals Cluster Program.

    ERIC Educational Resources Information Center

    Hunt, Charles R.

    A study developed a model to assist school administrators to estimate costs associated with the delivery of a metals cluster program at Norfolk State College, Virginia. It sought to construct the model so that costs could be explained as a function of enrollment levels. Data were collected through a literature review, computer searches of the…

  15. The social costs of dangerous products: an empirical investigation.

    PubMed

    Shapiro, Sidney; Ruttenberg, Ruth; Leigh, Paul

    2009-01-01

    Defective consumer products impose significant costs on consumers and third parties when they cause fatalities and injuries. This Article develops a novel approach to measuring the true extent of such costs, which may not be accurately captured under current methods of estimating the cost of dangerous products. Current analysis rests on a narrowly defined set of costs, excluding certain types of costs. The cost-of-injury estimates utilized in this Article address this omission by quantifying and incorporating these costs to provide a more complete picture of the true impact of defective consumer products. The new estimates help to gauge the true value of the civil liability system.

  16. The Development of a Methodology for Estimating the Cost of Air Force On-the-Job Training.

    ERIC Educational Resources Information Center

    Samers, Bernard N.; And Others

    The Air Force uses a standardized costing methodology for resident technical training schools (TTS); no comparable methodology exists for computing the cost of on-the-job training (OJT). This study evaluates three alternative survey methodologies and a number of cost models for estimating the cost of OJT for airmen training in the Administrative…

  17. Synthesis on construction unit cost development : technical report.

    DOT National Transportation Integrated Search

    2009-01-01

    Availability of historical unit cost data is an important factor in developing accurate project cost estimates. : State highway agencies (SHAs) collect data on historical bids and/or production rates, crew sizes and mixes, : material costs, and equip...

  18. Study on communications costs for Columbus utilization

    NASA Astrophysics Data System (ADS)

    Nielsen, Svend Moller; Sorensen, Nicolaj

    1988-09-01

    On the basis of a hypothetical communications scenario established for cost calculations, the expected communications costs for Columbus utilization in the year 1995 and onwards to the year 2025, are estimated to provide initial considerations for a charging policy in relation to potential Columbus users. A hypothetical sample of five European countries is established, and current telecommunications tariffs for the data, voice, and video communications required for the Columbus utilization in and between these five countries and the USA are identified. Technological, political, and commercial development trends are analyzed as to their likely influences on future telecommunications tariff development. Communications costs for the study period are estimated, assuming telecommunications administrations to be providers of service and considering estimated equipment and operations costs. Alternative communications solutions are indicated.

  19. Developing Analogy Cost Estimates for Space Missions

    NASA Technical Reports Server (NTRS)

    Shishko, Robert

    2004-01-01

    The analogy approach in cost estimation combines actual cost data from similar existing systems, activities, or items with adjustments for a new project's technical, physical or programmatic differences to derive a cost estimate for the new system. This method is normally used early in a project cycle when there is insufficient design/cost data to use as a basis for (or insufficient time to perform) a detailed engineering cost estimate. The major limitation of this method is that it relies on the judgment and experience of the analyst/estimator. The analyst must ensure that the best analogy or analogies have been selected, and that appropriate adjustments have been made. While analogy costing is common, there is a dearth of advice in the literature on the 'adjustment methodology', especially for hardware projects. This paper discusses some potential approaches that can improve rigor and repeatability in the analogy costing process.

  20. Remote Minehunting System (RMS)

    DTIC Science & Technology

    2015-12-01

    1449.4 1449.4 744.6 Confidence Level Confidence Level of cost estimate for current APB: 50% The Independent Cost Estimate to support the RMS Nunn...which the Derpartment has been successful. It is difficult to calculate mathematically the precise confidence levels associated with life-cycle cost...Baseline (TY $M) Initial PAUC Production Estimate Changes PAUC Development Estimate Econ Qty Sch Eng Est Oth Spt Total 12.957 -0.752 3.262 2.950 0.454

  1. U.S. Balance-of-Station Cost Drivers and Sensitivities (Presentation)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Maples, B.

    2012-10-01

    With balance-of-system (BOS) costs contributing up to 70% of the installed capital cost, it is fundamental to understanding the BOS costs for offshore wind projects as well as potential cost trends for larger offshore turbines. NREL developed a BOS model using project cost estimates developed by GL Garrad Hassan. Aspects of BOS covered include engineering and permitting, ports and staging, transportation and installation, vessels, foundations, and electrical. The data introduce new scaling relationships for each BOS component to estimate cost as a function of turbine parameters and size, project parameters and size, and soil type. Based on the new BOSmore » model, an analysis to understand the non‐turbine costs has been conducted. This analysis establishes a more robust baseline cost estimate, identifies the largest cost components of offshore wind project BOS, and explores the sensitivity of the levelized cost of energy to permutations in each BOS cost element. This presentation shows results from the model that illustrates the potential impact of turbine size and project size on the cost of energy from U.S. offshore wind plants.« less

  2. Early-Stage Capital Cost Estimation of Biorefinery Processes: A Comparative Study of Heuristic Techniques.

    PubMed

    Tsagkari, Mirela; Couturier, Jean-Luc; Kokossis, Antonis; Dubois, Jean-Luc

    2016-09-08

    Biorefineries offer a promising alternative to fossil-based processing industries and have undergone rapid development in recent years. Limited financial resources and stringent company budgets necessitate quick capital estimation of pioneering biorefinery projects at the early stages of their conception to screen process alternatives, decide on project viability, and allocate resources to the most promising cases. Biorefineries are capital-intensive projects that involve state-of-the-art technologies for which there is no prior experience or sufficient historical data. This work reviews existing rapid cost estimation practices, which can be used by researchers with no previous cost estimating experience. It also comprises a comparative study of six cost methods on three well-documented biorefinery processes to evaluate their accuracy and precision. The results illustrate discrepancies among the methods because their extrapolation on biorefinery data often violates inherent assumptions. This study recommends the most appropriate rapid cost methods and urges the development of an improved early-stage capital cost estimation tool suitable for biorefinery processes. © 2015 The Authors. Published by Wiley-VCH Verlag GmbH & Co. KGaA.

  3. The Economic Burden of Child Maltreatment in the United States And Implications for Prevention

    PubMed Central

    Fang, Xiangming; Brown, Derek S.; Florence, Curtis; Mercy, James A.

    2013-01-01

    Objectives To present new estimates of the average lifetime costs per child maltreatment victim and aggregate lifetime costs for all new child maltreatment cases incurred in 2008 using an incidence-based approach. Methods This study used the best available secondary data to develop cost per case estimates. For each cost category, the paper used attributable costs whenever possible. For those categories that attributable cost data were not available, costs were estimated as the product of incremental effect of child maltreatment on a specific outcome multiplied by the estimated cost associated with that outcome. The estimate of the aggregate lifetime cost of child maltreatment in 2008 was obtained by multiplying per-victim lifetime cost estimates by the estimated cases of new child maltreatment in 2008. Results The estimated average lifetime cost per victim of nonfatal child maltreatment is $210,012 in 2010 dollars, including $32,648 in childhood health care costs; $10,530 in adult medical costs; $144,360 in productivity losses; $7,728 in child welfare costs; $6,747 in criminal justice costs; and $7,999 in special education costs. The estimated average lifetime cost per death is $1,272,900, including $14,100 in medical costs and $1,258,800 in productivity losses. The total lifetime economic burden resulting from new cases of fatal and nonfatal child maltreatment in the United States in 2008 is approximately $124 billion. In sensitivity analysis, the total burden is estimated to be as large as $585 billion. Conclusions Compared with other health problems, the burden of child maltreatment is substantial, indicating the importance of prevention efforts to address the high prevalence of child maltreatment. PMID:22300910

  4. The cost of child health inequalities in Aotearoa New Zealand: a preliminary scoping study

    PubMed Central

    2012-01-01

    Background Health inequalities have been extensively documented, internationally and in New Zealand. The cost of reducing health inequities is often perceived as high; however, recent international studies suggest the cost of “doing nothing” is itself significant. This study aimed to develop a preliminary estimate of the economic cost of health inequities between Māori (indigenous) and non-Māori children in New Zealand. Methods Standard quantitative epidemiological methods and “cost of illness” methodology were employed, within a Kaupapa Māori theoretical framework. Data were obtained from national data collections held by the New Zealand Health Information Service and other health sector agencies. Results Preliminary estimates suggest child health inequities between Māori and non-Māori in New Zealand are cost-saving to the health sector. However the societal costs are significant. A conservative “base case” scenario estimate is over $NZ62 million per year, while alternative costing methods yield larger costs of nearly $NZ200 million per annum. The total cost estimate is highly sensitive to the costing method used and Value of Statistical Life applied, as the cost of potentially avoidable deaths of Māori children is the major contributor to this estimate. Conclusions This preliminary study suggests that health sector spending is skewed towards non-Māori children despite evidence of greater Māori need. Persistent child health inequities result in significant societal economic costs. Eliminating child health inequities, particularly in primary care access, could result in significant economic benefits for New Zealand. However, there are conceptual, ethical and methodological challenges in estimating the economic cost of child health inequities. Re-thinking of traditional economic frameworks and development of more appropriate methodologies is required. PMID:22640030

  5. The cost of child health inequalities in Aotearoa New Zealand: a preliminary scoping study.

    PubMed

    Mills, Clair; Reid, Papaarangi; Vaithianathan, Rhema

    2012-05-28

    Health inequalities have been extensively documented, internationally and in New Zealand. The cost of reducing health inequities is often perceived as high; however, recent international studies suggest the cost of "doing nothing" is itself significant. This study aimed to develop a preliminary estimate of the economic cost of health inequities between Māori (indigenous) and non-Māori children in New Zealand. Standard quantitative epidemiological methods and "cost of illness" methodology were employed, within a Kaupapa Māori theoretical framework. Data were obtained from national data collections held by the New Zealand Health Information Service and other health sector agencies. Preliminary estimates suggest child health inequities between Māori and non-Māori in New Zealand are cost-saving to the health sector. However the societal costs are significant. A conservative "base case" scenario estimate is over $NZ62 million per year, while alternative costing methods yield larger costs of nearly $NZ200 million per annum. The total cost estimate is highly sensitive to the costing method used and Value of Statistical Life applied, as the cost of potentially avoidable deaths of Māori children is the major contributor to this estimate. This preliminary study suggests that health sector spending is skewed towards non-Māori children despite evidence of greater Māori need. Persistent child health inequities result in significant societal economic costs. Eliminating child health inequities, particularly in primary care access, could result in significant economic benefits for New Zealand. However, there are conceptual, ethical and methodological challenges in estimating the economic cost of child health inequities. Re-thinking of traditional economic frameworks and development of more appropriate methodologies is required.

  6. Cost estimating procedure for unmanned satellites

    NASA Astrophysics Data System (ADS)

    Greer, H.; Campbell, H. G.

    1980-11-01

    Historical costs from 11 unmanned satellite programs were analyzed. From these data, total satellite cost estimating relationships (CERs) were developed for use during preliminary design studies. A time-related factor, which it is believed accounts for differences in technology, was observed in the data. Stratification of the data by type of payload was also found to be necessary. Cost differences that stem from production quantity variations were accounted for by adjustment factors developed from standard learning curve theory. An example to illustrate use of the CERs is provided.

  7. Generalized Redistribute-to-the-Right Algorithm: Application to the Analysis of Censored Cost Data

    PubMed Central

    CHEN, SHUAI; ZHAO, HONGWEI

    2013-01-01

    Medical cost estimation is a challenging task when censoring of data is present. Although researchers have proposed methods for estimating mean costs, these are often derived from theory and are not always easy to understand. We provide an alternative method, based on a replace-from-the-right algorithm, for estimating mean costs more efficiently. We show that our estimator is equivalent to an existing one that is based on the inverse probability weighting principle and semiparametric efficiency theory. We also propose an alternative method for estimating the survival function of costs, based on the redistribute-to-the-right algorithm, that was originally used for explaining the Kaplan–Meier estimator. We show that this second proposed estimator is equivalent to a simple weighted survival estimator of costs. Finally, we develop a more efficient survival estimator of costs, using the same redistribute-to-the-right principle. This estimator is naturally monotone, more efficient than some existing survival estimators, and has a quite small bias in many realistic settings. We conduct numerical studies to examine the finite sample property of the survival estimators for costs, and show that our new estimator has small mean squared errors when the sample size is not too large. We apply both existing and new estimators to a data example from a randomized cardiovascular clinical trial. PMID:24403869

  8. Software Cost-Estimation Model

    NASA Technical Reports Server (NTRS)

    Tausworthe, R. C.

    1985-01-01

    Software Cost Estimation Model SOFTCOST provides automated resource and schedule model for software development. Combines several cost models found in open literature into one comprehensive set of algorithms. Compensates for nearly fifty implementation factors relative to size of task, inherited baseline, organizational and system environment and difficulty of task.

  9. Reducing Contingency through Sampling at the Luckey FUSRAP Site - 13186

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Frothingham, David; Barker, Michelle; Buechi, Steve

    2013-07-01

    Typically, the greatest risk in developing accurate cost estimates for the remediation of hazardous, toxic, and radioactive waste sites is the uncertainty in the estimated volume of contaminated media requiring remediation. Efforts to address this risk in the remediation cost estimate can result in large cost contingencies that are often considered unacceptable when budgeting for site cleanups. Such was the case for the Luckey Formerly Utilized Sites Remedial Action Program (FUSRAP) site near Luckey, Ohio, which had significant uncertainty surrounding the estimated volume of site soils contaminated with radium, uranium, thorium, beryllium, and lead. Funding provided by the American Recoverymore » and Reinvestment Act (ARRA) allowed the U.S. Army Corps of Engineers (USACE) to conduct additional environmental sampling and analysis at the Luckey Site between November 2009 and April 2010, with the objective to further delineate the horizontal and vertical extent of contaminated soils in order to reduce the uncertainty in the soil volume estimate. Investigative work included radiological, geophysical, and topographic field surveys, subsurface borings, and soil sampling. Results from the investigative sampling were used in conjunction with Argonne National Laboratory's Bayesian Approaches for Adaptive Spatial Sampling (BAASS) software to update the contaminated soil volume estimate for the site. This updated volume estimate was then used to update the project cost-to-complete estimate using the USACE Cost and Schedule Risk Analysis process, which develops cost contingencies based on project risks. An investment of $1.1 M of ARRA funds for additional investigative work resulted in a reduction of 135,000 in-situ cubic meters (177,000 in-situ cubic yards) in the estimated base volume estimate. This refinement of the estimated soil volume resulted in a $64.3 M reduction in the estimated project cost-to-complete, through a reduction in the uncertainty in the contaminated soil volume estimate and the associated contingency costs. (authors)« less

  10. The cost of health professionals' brain drain in Kenya.

    PubMed

    Kirigia, Joses Muthuri; Gbary, Akpa Raphael; Muthuri, Lenity Kainyu; Nyoni, Jennifer; Seddoh, Anthony

    2006-07-17

    Past attempts to estimate the cost of migration were limited to education costs only and did not include the lost returns from investment. The objectives of this study were: (i) to estimate the financial cost of emigration of Kenyan doctors to the United Kingdom (UK) and the United States of America (USA); (ii) to estimate the financial cost of emigration of nurses to seven OECD countries (Canada, Denmark, Finland, Ireland, Portugal, UK, USA); and (iii) to describe other losses from brain drain. The costs of primary, secondary, medical and nursing schools were estimated in 2005. The cost information used in this study was obtained from one non-profit primary and secondary school and one public university in Kenya. The cost estimates represent unsubsidized cost. The loss incurred by Kenya through emigration was obtained by compounding the cost of educating a medical doctor and a nurse over the period between the average age of emigration (30 years) and the age of retirement (62 years) in recipient countries. The total cost of educating a single medical doctor from primary school to university is 65,997 US dollars; and for every doctor who emigrates, a country loses about 517,931 US dollars worth of returns from investment. The total cost of educating one nurse from primary school to college of health sciences is 43,180 US dollars; and for every nurse that emigrates, a country loses about 338,868 US dollars worth of returns from investment. Developed countries continue to deprive Kenya of millions of dollars worth of investments embodied in her human resources for health. If the current trend of poaching of scarce human resources for health (and other professionals) from Kenya is not curtailed, the chances of achieving the Millennium Development Goals would remain bleak. Such continued plunder of investments embodied in human resources contributes to further underdevelopment of Kenya and to keeping a majority of her people in the vicious circle of ill-health and poverty. Therefore, both developed and developing countries need to urgently develop and implement strategies for addressing the health human resource crisis.

  11. The cost of health professionals' brain drain in Kenya

    PubMed Central

    Kirigia, Joses Muthuri; Gbary, Akpa Raphael; Muthuri, Lenity Kainyu; Nyoni, Jennifer; Seddoh, Anthony

    2006-01-01

    Background Past attempts to estimate the cost of migration were limited to education costs only and did not include the lost returns from investment. The objectives of this study were: (i) to estimate the financial cost of emigration of Kenyan doctors to the United Kingdom (UK) and the United States of America (USA); (ii) to estimate the financial cost of emigration of nurses to seven OECD countries (Canada, Denmark, Finland, Ireland, Portugal, UK, USA); and (iii) to describe other losses from brain drain. Methods The costs of primary, secondary, medical and nursing schools were estimated in 2005. The cost information used in this study was obtained from one non-profit primary and secondary school and one public university in Kenya. The cost estimates represent unsubsidized cost. The loss incurred by Kenya through emigration was obtained by compounding the cost of educating a medical doctor and a nurse over the period between the average age of emigration (30 years) and the age of retirement (62 years) in recipient countries. Results The total cost of educating a single medical doctor from primary school to university is US$ 65,997; and for every doctor who emigrates, a country loses about US$ 517,931 worth of returns from investment. The total cost of educating one nurse from primary school to college of health sciences is US$ 43,180; and for every nurse that emigrates, a country loses about US$ 338,868 worth of returns from investment. Conclusion Developed countries continue to deprive Kenya of millions of dollars worth of investments embodied in her human resources for health. If the current trend of poaching of scarce human resources for health (and other professionals) from Kenya is not curtailed, the chances of achieving the Millennium Development Goals would remain bleak. Such continued plunder of investments embodied in human resources contributes to further underdevelopment of Kenya and to keeping a majority of her people in the vicious circle of ill-health and poverty. Therefore, both developed and developing countries need to urgently develop and implement strategies for addressing the health human resource crisis. PMID:16846492

  12. Estimating the Cost of a Bachelor's Degree: An Institutional Cost Analysis.

    ERIC Educational Resources Information Center

    To, Duc-Le

    The cost of a bachelor's degree was estimated and compared for different types of institutions. The objective was to develop a single index to show how much each type of institution spends on producing a bachelor's degree graduate, and to use trend data to show how these costs will change over time. The basic concept associated with the cost of a…

  13. LANDSAT D user data processing study

    NASA Technical Reports Server (NTRS)

    1976-01-01

    The major expected users of the LANDSAT D system and a preliminary system design of their required facilities are investigated. This system design will then be costed in order to provide an estimate of the incremental user costs necessitated by LANDSAT D. One major use of these cost estimates is as part of an overall economic cost/benefit argument being developed for the LANDSAT D system. The implication of this motive is key; the system design (and corresponding cost estimates) must be a credible one, but not necessarily an optimum one.

  14. Comprehensive investigation into historical pipeline construction costs and engineering economic analysis of Alaska in-state gas pipeline

    NASA Astrophysics Data System (ADS)

    Rui, Zhenhua

    This study analyzes historical cost data of 412 pipelines and 220 compressor stations. On the basis of this analysis, the study also evaluates the feasibility of an Alaska in-state gas pipeline using Monte Carlo simulation techniques. Analysis of pipeline construction costs shows that component costs, shares of cost components, and learning rates for material and labor costs vary by diameter, length, volume, year, and location. Overall average learning rates for pipeline material and labor costs are 6.1% and 12.4%, respectively. Overall average cost shares for pipeline material, labor, miscellaneous, and right of way (ROW) are 31%, 40%, 23%, and 7%, respectively. Regression models are developed to estimate pipeline component costs for different lengths, cross-sectional areas, and locations. An analysis of inaccuracy in pipeline cost estimation demonstrates that the cost estimation of pipeline cost components is biased except for in the case of total costs. Overall overrun rates for pipeline material, labor, miscellaneous, ROW, and total costs are 4.9%, 22.4%, -0.9%, 9.1%, and 6.5%, respectively, and project size, capacity, diameter, location, and year of completion have different degrees of impacts on cost overruns of pipeline cost components. Analysis of compressor station costs shows that component costs, shares of cost components, and learning rates for material and labor costs vary in terms of capacity, year, and location. Average learning rates for compressor station material and labor costs are 12.1% and 7.48%, respectively. Overall average cost shares of material, labor, miscellaneous, and ROW are 50.6%, 27.2%, 21.5%, and 0.8%, respectively. Regression models are developed to estimate compressor station component costs in different capacities and locations. An investigation into inaccuracies in compressor station cost estimation demonstrates that the cost estimation for compressor stations is biased except for in the case of material costs. Overall average overrun rates for compressor station material, labor, miscellaneous, land, and total costs are 3%, 60%, 2%, -14%, and 11%, respectively, and cost overruns for cost components are influenced by location and year of completion to different degrees. Monte Carlo models are developed and simulated to evaluate the feasibility of an Alaska in-state gas pipeline by assigning triangular distribution of the values of economic parameters. Simulated results show that the construction of an Alaska in-state natural gas pipeline is feasible at three scenarios: 500 million cubic feet per day (mmcfd), 750 mmcfd, and 1000 mmcfd.

  15. Standard cost elements for technology programs

    NASA Technical Reports Server (NTRS)

    Christensen, Carisa B.; Wagenfuehrer, Carl

    1992-01-01

    The suitable structure for an effective and accurate cost estimate for general purposes is discussed in the context of a NASA technology program. Cost elements are defined for research, management, and facility-construction portions of technology programs. Attention is given to the mechanisms for insuring the viability of spending programs, and the need for program managers is established for effecting timely fund disbursement. Formal, structures, and intuitive techniques are discussed for cost-estimate development, and cost-estimate defensibility can be improved with increased documentation. NASA policies for cash management are examined to demonstrate the importance of the ability to obligate funds and the ability to cost contracted funds. The NASA approach to consistent cost justification is set forth with a list of standard cost-element definitions. The cost elements reflect the three primary concerns of cost estimates: the identification of major assumptions, the specification of secondary analytic assumptions, and the status of program factors.

  16. Planning and Estimation of Operations Support Requirements

    NASA Technical Reports Server (NTRS)

    Newhouse, Marilyn E.; Barley, Bryan; Bacskay, Allen; Clardy, Dennon

    2010-01-01

    Life Cycle Cost (LCC) estimates during the proposal and early design phases, as well as project replans during the development phase, are heavily focused on hardware development schedules and costs. Operations (phase E) costs are typically small compared to the spacecraft development and test costs. This, combined with the long lead time for realizing operations costs, can lead to de-emphasizing estimation of operations support requirements during proposal, early design, and replan cost exercises. The Discovery and New Frontiers (D&NF) programs comprise small, cost-capped missions supporting scientific exploration of the solar system. Any LCC growth can directly impact the programs' ability to fund new missions, and even moderate yearly underestimates of the operations costs can present significant LCC impacts for deep space missions with long operational durations. The National Aeronautics and Space Administration (NASA) D&NF Program Office at Marshall Space Flight Center (MSFC) recently studied cost overruns and schedule delays for 5 missions. The goal was to identify the underlying causes for the overruns and delays, and to develop practical mitigations to assist the D&NF projects in identifying potential risks and controlling the associated impacts to proposed mission costs and schedules. The study found that 4 out of the 5 missions studied had significant overruns at or after launch due to underestimation of the complexity and supporting requirements for operations activities; the fifth mission had not launched at the time of the mission. The drivers behind these overruns include overly optimistic assumptions regarding the savings resulting from the use of heritage technology, late development of operations requirements, inadequate planning for sustaining engineering and the special requirements of long duration missions (e.g., knowledge retention and hardware/software refresh), and delayed completion of ground system development work. This paper updates the D&NF LCC study, looking at the operations (phase E) cost drivers in more detail and extending the study to include 2 additional missions and identifies areas for increased emphasis by project management in order to improve the fidelity of operations estimates.

  17. Lessons Learned for Planning and Estimating Operations Support Requirements

    NASA Technical Reports Server (NTRS)

    Newhouse, Marilyn

    2011-01-01

    Operations (phase E) costs are typically small compared to the spacecraft development and test costs. This, combined with the long lead time for realizing operations costs, can lead projects to focus on hardware development schedules and costs, de-emphasizing estimation of operations support requirements during proposal, early design, and replan cost exercises. The Discovery and New Frontiers (D&NF) programs comprise small, cost-capped missions supporting scientific exploration of the solar system. Even moderate yearly underestimates of the operations costs can present significant LCC impacts for deep space missions with long operational durations, and any LCC growth can directly impact the programs ability to fund new missions. The D&NF Program Office at Marshall Space Flight Center recently studied cost overruns for 7 D&NF missions related to phase C/D development of operational capabilities and phase E mission operations. The goal was to identify the underlying causes for the overruns and develop practical mitigations to assist the D&NF projects in identifying potential operations risks and controlling the associated impacts to operations development and execution costs. The study found that the drivers behind these overruns include overly optimistic assumptions regarding the savings resulting from the use of heritage technology, late development of operations requirements, inadequate planning for sustaining engineering and the special requirements of long duration missions (e.g., knowledge retention and hardware/software refresh), and delayed completion of ground system development work. This presentation summarizes the study and the results, providing a set of lessons NASA can use to improve early estimation and validation of operations costs.

  18. NATIONAL STORMWATER CALCULATOR: LOW IMPACT DEVELOPMENT STORMWATER CONTROL COST ESTIMATION PROGRAMMING & FUTURE ENHANCEMENTS

    EPA Science Inventory

    National Stormwater Calculator: Low Impact Development Stormwater Control Cost Estimation Programming & Future EnhancementsJason Berner1; Michael Tryby1; Scott Struck2, Dan Pankani2, Marion Deerhake3, Michelle Simon11. USEPA2. GeoSyntec, Inc.3. RTI, Inc.The National Stormwater Ca...

  19. Data Service Provider Cost Estimation Tool

    NASA Technical Reports Server (NTRS)

    Fontaine, Kathy; Hunolt, Greg; Booth, Arthur L.; Banks, Mel

    2011-01-01

    The Data Service Provider Cost Estimation Tool (CET) and Comparables Database (CDB) package provides to NASA s Earth Science Enterprise (ESE) the ability to estimate the full range of year-by-year lifecycle cost estimates for the implementation and operation of data service providers required by ESE to support its science and applications programs. The CET can make estimates dealing with staffing costs, supplies, facility costs, network services, hardware and maintenance, commercial off-the-shelf (COTS) software licenses, software development and sustaining engineering, and the changes in costs that result from changes in workload. Data Service Providers may be stand-alone or embedded in flight projects, field campaigns, research or applications projects, or other activities. The CET and CDB package employs a cost-estimation-by-analogy approach. It is based on a new, general data service provider reference model that provides a framework for construction of a database by describing existing data service providers that are analogs (or comparables) to planned, new ESE data service providers. The CET implements the staff effort and cost estimation algorithms that access the CDB and generates the lifecycle cost estimate for a new data services provider. This data creates a common basis for an ESE proposal evaluator for considering projected data service provider costs.

  20. Capital cost estimate

    NASA Technical Reports Server (NTRS)

    1975-01-01

    The capital cost estimate for the nuclear process heat source (NPHS) plant was made by: (1) using costs from the current commercial HTGR for electricity production as a base for items that are essentially the same and (2) development of new estimates for modified or new equipment that is specifically for the process heat application. Results are given in tabular form and cover the total investment required for each process temperature studied.

  1. Illegal Alien Schoolchildren: Issues in Estimating State-by-State Costs. Report to the Chairman, Committee on the Judiciary, House of Representatives. GAO-04-733

    ERIC Educational Resources Information Center

    Kingsbury, Nancy R.

    2004-01-01

    To address the potential for estimating the costs of educating illegal alien schoolchildren, this report: identifies major government sources of relevant data; describes a Census Bureau plan for developing new information; and outlines cost-estimation approaches. Data were collected through: a survey of 20 states; outreach through associations of…

  2. Readings in program control

    NASA Technical Reports Server (NTRS)

    Hoban, Francis T. (Editor); Lawbaugh, William M. (Editor); Hoffman, Edward J. (Editor)

    1994-01-01

    Under the heading of Program Control, a number of related topics are discussed: cost estimating methods; planning and scheduling; cost overruns in the defense industry; the history of estimating; the advantages of cost plus award fee contracts; and how program control techniques led to the success of a NASA development project.

  3. Massive yet grossly underestimated global costs of invasive insects

    PubMed Central

    Bradshaw, Corey J. A.; Leroy, Boris; Bellard, Céline; Roiz, David; Albert, Céline; Fournier, Alice; Barbet-Massin, Morgane; Salles, Jean-Michel; Simard, Frédéric; Courchamp, Franck

    2016-01-01

    Insects have presented human society with some of its greatest development challenges by spreading diseases, consuming crops and damaging infrastructure. Despite the massive human and financial toll of invasive insects, cost estimates of their impacts remain sporadic, spatially incomplete and of questionable quality. Here we compile a comprehensive database of economic costs of invasive insects. Taking all reported goods and service estimates, invasive insects cost a minimum of US$70.0 billion per year globally, while associated health costs exceed US$6.9 billion per year. Total costs rise as the number of estimate increases, although many of the worst costs have already been estimated (especially those related to human health). A lack of dedicated studies, especially for reproducible goods and service estimates, implies gross underestimation of global costs. Global warming as a consequence of climate change, rising human population densities and intensifying international trade will allow these costly insects to spread into new areas, but substantial savings could be achieved by increasing surveillance, containment and public awareness. PMID:27698460

  4. The design of low cost structures for extensive ground arrays

    NASA Technical Reports Server (NTRS)

    Franklin, H. A.; Leonard, R. S.

    1980-01-01

    The development of conceptual designs of solar array support structures and their foundations including considerations of the use of concrete, steel, aluminum, or timber are reported. Some cost trends were examined by varying selected parameters to determine optimum configurations. Detailed civil/structural design criteria were developed. Using these criteria, eight detailed designs for support structures and foundations were developed and cost estimates were made. As a result of the study wind was identified as the major loading experienced by these low height structures, whose arrays are likely to extend over large tracts of land. Proper wind load estimating is considered essential to developing realistic structural designs and achieving minimum cost support structures. Wind tunnel testing of a conceptual array field was undertaken and some of the resulting wind design criteria are presented. The SPS rectenna system designs may be less sensitive to wind load estimates, but consistent design criteria remain important.

  5. Costs of Addressing Heroin Addiction in Malaysia and 32 Comparable Countries Worldwide

    PubMed Central

    Ruger, Jennifer Prah; Chawarski, Marek; Mazlan, Mahmud; Luekens, Craig; Ng, Nora; Schottenfeld, Richard

    2012-01-01

    Objective Develop and apply new costing methodologies to estimate costs of opioid dependence treatment in countries worldwide. Data Sources/Study Setting Micro-costing methodology developed and data collected during randomized controlled trial (RCT) involving 126 patients (July 2003–May 2005) in Malaysia. Gross-costing methodology developed to estimate costs of treatment replication in 32 countries with data collected from publicly available sources. Study Design Fixed, variable, and societal cost components of Malaysian RCT micro-costed and analytical framework created and employed for gross-costing in 32 countries selected by three criteria relative to Malaysia: major heroin problem, geographic proximity, and comparable gross domestic product (GDP) per capita. Principal Findings Medication, and urine and blood testing accounted for the greatest percentage of total costs for both naltrexone (29–53 percent) and buprenorphine (33–72 percent) interventions. In 13 countries, buprenorphine treatment could be provided for under $2,000 per patient. For all countries except United Kingdom and Singapore, incremental costs per person were below $1,000 when comparing buprenorphine to naltrexone. An estimated 100 percent of opiate users in Cambodia and Lao People's Democratic Republic could be treated for $8 and $30 million, respectively. Conclusions Buprenorphine treatment can be provided at low cost in countries across the world. This study's new costing methodologies provide tools for health systems worldwide to determine the feasibility and cost of similar interventions. PMID:22091732

  6. Costs of addressing heroin addiction in Malaysia and 32 comparable countries worldwide.

    PubMed

    Ruger, Jennifer Prah; Chawarski, Marek; Mazlan, Mahmud; Luekens, Craig; Ng, Nora; Schottenfeld, Richard

    2012-04-01

    Develop and apply new costing methodologies to estimate costs of opioid dependence treatment in countries worldwide. Micro-costing methodology developed and data collected during randomized controlled trial (RCT) involving 126 patients (July 2003-May 2005) in Malaysia. Gross-costing methodology developed to estimate costs of treatment replication in 32 countries with data collected from publicly available sources. Fixed, variable, and societal cost components of Malaysian RCT micro-costed and analytical framework created and employed for gross-costing in 32 countries selected by three criteria relative to Malaysia: major heroin problem, geographic proximity, and comparable gross domestic product (GDP) per capita. Medication, and urine and blood testing accounted for the greatest percentage of total costs for both naltrexone (29-53 percent) and buprenorphine (33-72 percent) interventions. In 13 countries, buprenorphine treatment could be provided for under $2,000 per patient. For all countries except United Kingdom and Singapore, incremental costs per person were below $1,000 when comparing buprenorphine to naltrexone. An estimated 100 percent of opiate users in Cambodia and Lao People's Democratic Republic could be treated for $8 and $30 million, respectively. Buprenorphine treatment can be provided at low cost in countries across the world. This study's new costing methodologies provide tools for health systems worldwide to determine the feasibility and cost of similar interventions. © Health Research and Educational Trust.

  7. Planetary spacecraft cost modeling utilizing labor estimating relationships

    NASA Technical Reports Server (NTRS)

    Williams, Raymond

    1990-01-01

    A basic computerized technology is presented for estimating labor hours and cost of unmanned planetary and lunar programs. The user friendly methodology designated Labor Estimating Relationship/Cost Estimating Relationship (LERCER) organizes the forecasting process according to vehicle subsystem levels. The level of input variables required by the model in predicting cost is consistent with pre-Phase A type mission analysis. Twenty one program categories were used in the modeling. To develop the model, numerous LER and CER studies were surveyed and modified when required. The result of the research along with components of the LERCER program are reported.

  8. Using Work Breakdown Structure Models to Develop Unit Treatment Costs

    EPA Science Inventory

    This article presents a new cost modeling approach called work breakdown structure (WBS), designed to develop unit costs for drinking water technologies. WBS involves breaking the technology into its discrete components for the purposes of estimating unit costs. The article dem...

  9. Probabilistic estimation of numbers and costs of future landslides in the San Francisco Bay region

    USGS Publications Warehouse

    Crovelli, R.A.; Coe, J.A.

    2009-01-01

    We used historical records of damaging landslides triggered by rainstorms and a newly developed Probabilistic Landslide Assessment Cost Estimation System (PLACES) to estimate the numbers and direct costs of future landslides in the 10-county San Francisco Bay region. Historical records of damaging landslides in the region are incomplete. Therefore, our estimates of numbers and costs of future landslides are minimal estimates. The estimated mean annual number of future damaging landslides for the entire 10-county region is about 65. Santa Cruz County has the highest estimated mean annual number of damaging future landslides (about 18), whereas Napa, San Francisco, and Solano Counties have the lowest estimated mean numbers of damaging landslides (about 1 each). The estimated mean annual cost of future landslides in the entire region is about US $14.80 million (year 2000 $). The estimated mean annual cost is highest for San Mateo County ($3.24 million) and lowest for Solano County ($0.18 million). The annual per capita cost for the entire region will be about $2.10. Santa Cruz County will have the highest annual per capita cost at $8.45, whereas San Francisco County will have the lowest per capita cost at $0.31. Normalising costs by dividing by the percentage of land area with slopes equal to or greater than 17% indicates that San Francisco County will have the highest cost per square km ($7,101), whereas Santa Clara County will have the lowest cost per square km ($229). These results indicate that the San Francisco Bay region has one of the highest levels of landslide risk in the United States. Compared with landslide cost estimates from the rest of the world, the risk level in the Bay region seems high, but not exceptionally high.

  10. Assessment of transparency of cost estimates in economic evaluations of patient safety programmes.

    PubMed

    Fukuda, Haruhisa; Imanaka, Yuichi

    2009-06-01

    Transparency of costing is essential for decision-makers who require information on the efficiency of a health care programme, because effective decisions depend largely on applicability to their settings. The main objectives of this study were to assess published studies for transparency of cost estimates. We first developed criteria with two axes by reviewing publications dealing with economic evaluations and cost accounting studies: clarification of the scope of costing and accuracy of method evaluating costs. We then performed systematic searches of the literature for studies which estimated prevention costs and assessed the transparency and accuracy of costing based on our criteria. Forty studies met the inclusion criteria. Half of the studies reported data for both the quantity and unit price of programmes in regard to prevention costs. Although 30 studies estimated costs of adverse events, 19 of these described the scope of costing only, and just five studies used a micro-costing method. Among 30 studies that estimated 'gross cost savings' and 'net cost savings', there was a huge discrepancy in labels. Even if a cost study was conducted in accordance with existing techniques of economic evaluation which mostly paid attention to internal validity of cost estimates, without adequate explanation of the process of costing, reproducibility cannot be assured and the study may lose its value as scientific information. This study found that there is tremendous room for improvement.

  11. Parametric Cost Models for Space Telescopes

    NASA Technical Reports Server (NTRS)

    Stahl, H. Philip

    2010-01-01

    A study is in-process to develop a multivariable parametric cost model for space telescopes. Cost and engineering parametric data has been collected on 30 different space telescopes. Statistical correlations have been developed between 19 variables of 59 variables sampled. Single Variable and Multi-Variable Cost Estimating Relationships have been developed. Results are being published.

  12. Warfighter Information Network-Tactical Increment 2 (WIN-T Inc 2)

    DTIC Science & Technology

    2015-12-01

    Company- level . Using equipment mounted on combat platforms, WIN-T Inc 2 delivers a mobile capability that reduces reliance on fixed infrastructure...Cost Estimate Reference Army Cost Position (ACP) dated April 28, 2015 Confidence Level Confidence Level of cost estimate for current APB: 50% The...Development Estimate Changes PAUC Production Estimate Econ Qty Sch Eng Est Oth Spt Total 2.064 -0.055 -0.063 0.016 0.000 0.093 0.000 0.200 0.191 2.255

  13. Economic cost of initial attack and large-fire suppression

    Treesearch

    Armando González-Cabán

    1983-01-01

    A procedure has been developed for estimating the economic cost of initial attack and large-fire suppression. The procedure uses a per-unit approach to estimate total attack and suppression costs on an input-by-input basis. Fire management inputs (FMIs) are the production units used. All direct and indirect costs are charged to the FMIs. With the unit approach, all...

  14. Sensitivity of whitewater rafting consumers surplus to pecuniary travel cost specifications

    Treesearch

    Donald B.K. English; J. Michael Bowker

    1996-01-01

    Considerable research has examined how different ways of accounting for onsite and travel time affect surplus estimates from travel cost models. However, little has been done regarding different definitions of out-of-pocket costs. Estimates of per trip consumer surplus are developed for a zonal travel cost model for outfitted rafting on the Chattooga River. Nine price...

  15. The Economic Burden of Child Maltreatment in the United States and Implications for Prevention

    ERIC Educational Resources Information Center

    Fang, Xiangming; Brown, Derek S.; Florence, Curtis S.; Mercy, James A.

    2012-01-01

    Objectives: To present new estimates of the average lifetime costs per child maltreatment victim and aggregate lifetime costs for all new child maltreatment cases incurred in 2008 using an incidence-based approach. Methods: This study used the best available secondary data to develop cost per case estimates. For each cost category, the paper used…

  16. Spacecraft Complexity Subfactors and Implications on Future Cost Growth

    NASA Technical Reports Server (NTRS)

    Leising, Charles J.; Wessen, Randii; Ellyin, Ray; Rosenberg, Leigh; Leising, Adam

    2013-01-01

    During the last ten years the Jet Propulsion Laboratory has used a set of cost-risk subfactors to independently estimate the magnitude of development risks that may not be covered in the high level cost models employed during early concept development. Within the last several years the Laboratory has also developed a scale of Concept Maturity Levels with associated criteria to quantitatively assess a concept's maturity. This latter effort has been helpful in determining whether a concept is mature enough for accurate costing but it does not provide any quantitative estimate of cost risk. Unfortunately today's missions are significantly more complex than when the original cost-risk subfactors were first formulated. Risks associated with complex missions are not being adequately evaluated and future cost growth is being underestimated. The risk subfactor process needed to be updated.

  17. Equivalent Mass versus Life Cycle Cost for Life Support Technology Selection

    NASA Technical Reports Server (NTRS)

    Jones, Harry

    2003-01-01

    The decision to develop a particular life support technology or to select it for flight usually depends on the cost to develop and fly it. Other criteria - performance, safety, reliability, crew time, and risk - are considered, but cost is always an important factor. Because launch cost accounts for most of the cost of planetary missions, and because launch cost is directly proportional to the mass launched, equivalent mass has been used instead of cost to select life support technology. The equivalent mass of a life support system includes the estimated masses of the hardware and of the pressurized volume, power supply, and cooling system that the hardware requires. The equivalent mass is defined as the total payload launch mass needed to provide and support the system. An extension of equivalent mass, Equivalent System Mass (ESM), has been established for use in Advanced Life Support. A crew time mass-equivalent and sometimes other non-mass factors are added to equivalent mass to create ESM. Equivalent mass is an estimate of the launch cost only. For earth orbit rather than planetary missions, the launch cost is usually exceeded by the cost of Design, Development, Test, and Evaluation (DDT&E). Equivalent mass is used only in life support analysis. Life Cycle Cost (LCC) is much more commonly used. LCC includes DDT&E, launch, and operations costs. Since LCC includes launch cost, it is always a more accurate cost estimator than equivalent mass. The relative costs of development, launch, and operations vary depending on the mission design, destination, and duration. Since DDT&E or operations may cost more than launch, LCC may give a more accurate cost ranking than equivalent mass. To be sure of identifying the lowest cost technology for a particular mission, we should use LCC rather than equivalent mass.

  18. The 18 and 30 GHz fixed service communications satellite system study. [to determine the cost and performance characteristics

    NASA Technical Reports Server (NTRS)

    Bronstein, L. M.

    1979-01-01

    The use of the 18 and 30 GHz bands for fixed service satellite communications is examined. The cost and performance expected of 18 and 30 GHz hardware is assessed, selected trunking and direct to user concepts are optimized, and the cost of these systems are estimated. The effect of rain attenuation on the technical and economic viability of the system and methods circumventing the problem are discussed. Technology developments are investigated and cost estimates of these developments are presented.

  19. Strategically placing green infrastructure: cost-effective land conservation in the floodplain.

    PubMed

    Kousky, Carolyn; Olmstead, Sheila M; Walls, Margaret A; Macauley, Molly

    2013-04-16

    Green infrastructure approaches have attracted increased attention from local governments as a way to lower flood risk and provide an array of other environmental services. The peer-reviewed literature, however, offers few estimates of the economic impacts of such approaches at the watershed scale. We estimate the avoided flood damages and the costs of preventing development of floodplain parcels in the East River Watershed of Wisconsin's Lower Fox River Basin. Results suggest that the costs of preventing conversion of all projected floodplain development would exceed the flood damage mitigation benefits by a substantial margin. However, targeting of investments to high-benefit, low-cost parcels can reverse this equation, generating net benefits. The analysis demonstrates how any flood-prone community can use a geographic-information-based model to estimate the flood damage reduction benefits of green infrastructure, compare them to the costs, and target investments to design cost-effective nonstructural flood damage mitigation policies.

  20. The costs of hepatitis A infections in South Korea

    PubMed Central

    Kim, Kyohyun; Jeong, Baek-Geun; Ki, Moran; Park, Mira; Park, Jin Kyung; Choi, Bo Youl; Yoo, Weon-Seob

    2014-01-01

    OBJECTIVES: The incidence of hepatitis A infections among young adults has recently increased in South Korea. Although universal vaccination has often been suggested to mitigate the problem, its rationale has not been well-understood. Estimating the societal costs of hepatitis A infections might support the development of intervention strategies. METHODS: We classified hepatitis A infections into eight clinical pathways and estimated the number of occurrences and cost per case for each clinical pathway using claim data from National Health Insurance and several national surveys as well as assumptions based on previous studies. To determine the total costs of a hepatitis A infection, both direct and indirect costs were estimated. Indirect costs were estimated using the human-capital approach. All costs are adjusted to the year 2008. RESULTS: There were 30,240 identified cases of hepatitis A infections in 2008 for a total cost of 80,873 million won (2.7 million won per case). Direct and indirect costs constituted 56.2% and 43.8% of the total costs, respectively. People aged 20-39 accounted for 71.3% of total cases and 74.6% of total costs. Medical costs per capita were the lowest in the 0-4 age group and highest in the 20-29 age group. CONCLUSIONS: This study could provide evidence for development of cost-effective interventions to control hepatitis A infections. But the true costs including uncaptured and intangible costs of hepatitis A infections might be higher than our results indicate. PMID:25139060

  1. Utilizing Expert Knowledge in Estimating Future STS Costs

    NASA Technical Reports Server (NTRS)

    Fortner, David B.; Ruiz-Torres, Alex J.

    2004-01-01

    A method of estimating the costs of future space transportation systems (STSs) involves classical activity-based cost (ABC) modeling combined with systematic utilization of the knowledge and opinions of experts to extend the process-flow knowledge of existing systems to systems that involve new materials and/or new architectures. The expert knowledge is particularly helpful in filling gaps that arise in computational models of processes because of inconsistencies in historical cost data. Heretofore, the costs of planned STSs have been estimated following a "top-down" approach that tends to force the architectures of new systems to incorporate process flows like those of the space shuttles. In this ABC-based method, one makes assumptions about the processes, but otherwise follows a "bottoms up" approach that does not force the new system architecture to incorporate a space-shuttle-like process flow. Prototype software has been developed to implement this method. Through further development of software, it should be possible to extend the method beyond the space program to almost any setting in which there is a need to estimate the costs of a new system and to extend the applicable knowledge base in order to make the estimate.

  2. Landslide risk in the San Francisco Bay region

    USGS Publications Warehouse

    Coe, J.A.; Crovelli, R.A.

    2008-01-01

    We have used historical records of damaging landslides triggered by rainstorms, and a newly developed Probabilistic Landslide Assessment Cost Estimation System (PLACES), to estimate the numbers and direct costs of future landslides in the San Francisco Bay region. The estimated annual cost of future landslides in the entire region is about US $15 million (year 2000 $). The estimated annual cost is highest for San Mateo County ($3.32 million) and lowest for Solano County ($0.18 million). Normalizing costs by dividing by the percentage of land area with slopes equal or greater than about 10° indicates that San Francisco County will have the highest cost per square km ($7,400), whereas Santa Clara County will have the lowest cost per square km ($230). These results indicate that the San Francisco Bay region has one of the highest levels of landslide risk in the United States. Compared to landslide cost estimates from the rest of the world, the risk level in the Bay region seems high, but not exceptionally high.

  3. 48 CFR 7.105 - Contents of written acquisition plans.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... appropriate, discuss the cost model used to develop life-cycle-cost estimates. (ii) Design-to-cost. Describe the design-to-cost objective(s) and underlying assumptions, including the rationale for quantity... of stimulating industry involvement during design and development in recommending the most...

  4. 48 CFR 7.105 - Contents of written acquisition plans.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... appropriate, discuss the cost model used to develop life-cycle-cost estimates. (ii) Design-to-cost. Describe the design-to-cost objective(s) and underlying assumptions, including the rationale for quantity... of stimulating industry involvement during design and development in recommending the most...

  5. 48 CFR 7.105 - Contents of written acquisition plans.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... appropriate, discuss the cost model used to develop life-cycle-cost estimates. (ii) Design-to-cost. Describe the design-to-cost objective(s) and underlying assumptions, including the rationale for quantity... of stimulating industry involvement during design and development in recommending the most...

  6. Report summary Prevalence and monetary costs of dementia in Canada (2016): a report by the Alzheimer Society of Canada.

    PubMed

    2016-10-01

    Dementia prevalence estimates vary among population-based studies, depending on the definitions of dementia, methodologies and data sources and types of costs they use. A common approach is needed to avoid confusion and increase public and stakeholder confidence in the estimates. Since 1994, five major studies have yielded widely differing estimates of dementia prevalence and monetary costs of dementia in Canada. These studies variously estimated the prevalence of dementia for the year 2011 as low as 340 170 and as high as 747 000. The main reason for this difference was that mild cognitive impairment (MCI) was not consistently included in the projections. The estimated monetary costs of dementia for the same year also varied, from $910 million to $33 billion. This discrepancy is largely due to three factors: (1) the lack of agreed-upon methods for estimating financial costs; (2) the unavailability of prevalence estimates for the various stages of dementia (mild, moderate and severe), which directly affect the amount of money spent; and (3) the absence of tools to measure direct, indirect and intangible costs more accurately. Given the increasing challenges of dementia in Canada and around the globe, reconciling these differences is critical for developing standards to generate reliable information for public consumption and to shape public policy and service development.

  7. Estimating the cost of cervical cancer screening in five developing countries

    PubMed Central

    Goldhaber-Fiebert, Jeremy D; Goldie, Sue J

    2006-01-01

    Background Cost-effectiveness analyses (CEAs) can provide useful information to policymakers concerned with the broad allocation of resources as well as to local decision makers choosing between different options for reducing the burden from a single disease. For the latter, it is important to use country-specific data when possible and to represent cost differences between countries that might make one strategy more or less attractive than another strategy locally. As part of a CEA of cervical cancer screening in five developing countries, we supplemented limited primary cost data by developing other estimation techniques for direct medical and non-medical costs associated with alternative screening approaches using one of three initial screening tests: simple visual screening, HPV DNA testing, and cervical cytology. Here, we report estimation methods and results for three cost areas in which data were lacking. Methods To supplement direct medical costs, including staff, supplies, and equipment depreciation using country-specific data, we used alternative techniques to quantify cervical cytology and HPV DNA laboratory sample processing costs. We used a detailed quantity and price approach whose face validity was compared to an adaptation of a US laboratory estimation methodology. This methodology was also used to project annual sample processing capacities for each laboratory type. The cost of sample transport from the clinic to the laboratory was estimated using spatial models. A plausible range of the cost of patient time spent seeking and receiving screening was estimated using only formal sector employment and wages as well as using both formal and informal sector participation and country-specific minimum wages. Data sources included primary data from country-specific studies, international databases, international prices, and expert opinion. Costs were standardized to year 2000 international dollars using inflation adjustment and purchasing power parity. Results Cervical cytology laboratory processing costs were I$1.57–3.37 using the quantity and price method compared to I$1.58–3.02 from the face validation method. HPV DNA processing costs were I$6.07–6.59. Rural laboratory transport costs for cytology were I$0.12–0.64 and I$0.14–0.74 for HPV DNA laboratories. Under assumptions of lower resource efficiency, these estimates increased to I$0.42–0.83 and I$0.54–1.06. Estimates of the value of an hour of patient time using only formal sector participation were I$0.07–4.16, increasing to I$0.30–4.80 when informal and unpaid labor was also included. The value of patient time for traveling, waiting, and attending a screening visit was I$0.68–17.74. With the total cost of screening for cytology and HPV DNA testing ranging from I$4.85–40.54 and I$11.30–48.77 respectively, the cost of the laboratory transport, processing, and patient time accounted for 26–66% and 33–65% of the total costs. From a payer perspective, laboratory transport and processing accounted for 18–48% and 25–60% of total direct medical costs of I$4.11–19.96 and I$10.57–28.18 respectively. Conclusion Cost estimates of laboratory processing, sample transport, and patient time account for a significant proportion of total cervical cancer screening costs in five developing countries and provide important inputs for CEAs of alternative screening modalities. PMID:16887041

  8. Landfill Gas Energy Cost Model Version 3.0 (LFGcost-Web V3 ...

    EPA Pesticide Factsheets

    To help stakeholders estimate the costs of a landfill gas (LFG) energy project, in 2002, LMOP developed a cost tool (LFGcost). Since then, LMOP has routinely updated the tool to reflect changes in the LFG energy industry. Initially the model was designed for EPA to assist landfills in evaluating the economic and financial feasibility of LFG energy project development. In 2014, LMOP developed a public version of the model, LFGcost-Web (Version 3.0), to allow landfill and industry stakeholders to evaluate project feasibility on their own. LFGcost-Web can analyze costs for 12 energy recovery project types. These project costs can be estimated with or without the costs of a gas collection and control system (GCCS). The EPA used select equations from LFGcost-Web to estimate costs of the regulatory options in the 2015 proposed revisions to the MSW Landfills Standards of Performance (also known as New Source Performance Standards) and the Emission Guidelines (herein thereafter referred to collectively as the Landfill Rules). More specifically, equations derived from LFGcost-Web were applied to each landfill expected to be impacted by the Landfill Rules to estimate annualized installed capital costs and annual O&M costs of a gas collection and control system. In addition, after applying the LFGcost-Web equations to the list of landfills expected to require a GCCS in year 2025 as a result of the proposed Landfill Rules, the regulatory analysis evaluated whether electr

  9. Counting the cost: estimating the economic benefit of pedophile treatment programs.

    PubMed

    Shanahan, M; Donato, R

    2001-04-01

    The principal objective of this paper is to identify the economic costs and benefits of pedophile treatment programs incorporating both the tangible and intangible cost of sexual abuse to victims. Cost estimates of cognitive behavioral therapy programs in Australian prisons are compared against the tangible and intangible costs to victims of being sexually abused. Estimates are prepared that take into account a number of problematic issues. These include the range of possible recidivism rates for treatment programs; the uncertainty surrounding the number of child sexual molestation offences committed by recidivists; and the methodological problems associated with estimating the intangible costs of sexual abuse on victims. Despite the variation in parameter estimates that impact on the cost-benefit analysis of pedophile treatment programs, it is found that potential range of economic costs from child sexual abuse are substantial and the economic benefits to be derived from appropriate and effective treatment programs are high. Based on a reasonable set of parameter estimates, in-prison, cognitive therapy treatment programs for pedophiles are likely to be of net benefit to society. Despite this, a critical area of future research must include further methodological developments in estimating the quantitative impact of child sexual abuse in the community.

  10. Manufacturing Cost Levelization Model – A User’s Guide

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Morrow, William R.; Shehabi, Arman; Smith, Sarah Josephine

    The Manufacturing Cost Levelization Model is a cost-performance techno-economic model that estimates total large-scale manufacturing costs for necessary to produce a given product. It is designed to provide production cost estimates for technology researchers to help guide technology research and development towards an eventual cost-effective product. The model presented in this user’s guide is generic and can be tailored to the manufacturing of any product, including the generation of electricity (as a product). This flexibility, however, requires the user to develop the processes and process efficiencies that represents a full-scale manufacturing facility. The generic model is comprised of several modulesmore » that estimate variable costs (material, labor, and operating), fixed costs (capital & maintenance), financing structures (debt and equity financing), and tax implications (taxable income after equipment and building depreciation, debt interest payments, and expenses) of a notional manufacturing plant. A cash-flow method is used to estimate a selling price necessary for the manufacturing plant to recover its total cost of production. A levelized unit sales price ($ per unit of product) is determined by dividing the net-present value of the manufacturing plant’s expenses ($) by the net present value of its product output. A user defined production schedule drives the cash-flow method that determines the levelized unit price. In addition, an analyst can increase the levelized unit price to include a gross profit margin to estimate a product sales price. This model allows an analyst to understand the effect that any input variables could have on the cost of manufacturing a product. In addition, the tool is able to perform sensitivity analysis, which can be used to identify the key variables and assumptions that have the greatest influence on the levelized costs. This component is intended to help technology researchers focus their research attention on tasks that offer the greatest opportunities for cost reduction early in the research and development stages of technology invention.« less

  11. Characteristic features of determining the labor input and estimated cost of the development and manufacture of equipment

    NASA Technical Reports Server (NTRS)

    Kurmanaliyev, T. I.; Breslavets, A. V.

    1974-01-01

    The difficulties in obtaining exact calculation data for the labor input and estimated cost are noted. The method of calculating the labor cost of the design work using the provisional normative indexes with respect to individual forms of operations is proposed. Values of certain coefficients recommended for use in the practical calculations of the labor input for the development of new scientific equipment for space research are presented.

  12. 24 CFR Appendix to Part 971 - Methodology of Comparing Cost of Public Housing With Cost of Tenant-Based Assistance

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... bills directly to the utility company, then the development's monthly operating cost per occupied unit... Authority and its affected developments. c. As an example of estimating development operating costs from PHA... divided by 270, the product of 22.5 and 12, to give a cost per unit month of $222. C. Accrual The monthly...

  13. Costs of Alcohol-Involved Crashes, United States, 2010

    PubMed Central

    Zaloshnja, Eduard; Miller, Ted R.; Blincoe, Lawrence J.

    2013-01-01

    This paper estimates total and unit costs of alcohol-involved crashes in the U.S. in 2010. With methods from earlier studies, we estimated costs per crash survivor by MAIS, body part, and fracture/dislocation involvement. We multiplied them times 2010 crash incidence estimates from NHTSA data sets, with adjustments for underreporting of crashes and their alcohol involvement. The unit costs are lifetime costs discounted at 3%. To develop medical costs, we combined 2008 Health Care Utilization Program national data for hospitalizations and ED visits of crash survivors with prior estimates of post-discharge costs. Productivity losses drew on Current Population Survey and American Time Use Survey data. Quality of life losses came from a 2011 AAAM paper and property damage from insurance data. We built a hybrid incidence file comprised of 2008–2010 and 1984–86 NHTSA crash surveillance data, weighted with 2010 General Estimates System weights. Fatality data came from the 2010 FARS. An estimated 12% of 2010 crashes but only 0.9% of miles driven were alcohol-involved (BAC > .05). Alcohol-involved crashes cost an estimated $125 billion. That is 22.5% of the societal cost of all crashes. Alcohol-attributable crashes accounted for an estimated 22.5% of US auto liability insurance payments. Alcohol-involved crashes cost $0.86 per drink. Above the US BAC limit of .08, crash costs were $8.37 per mile driven; 1 in 788 trips resulted in a crash and 1 in 1,016 trips in an arrest. Unit costs for crash survivors by severity are higher for impaired driving than for other crashes. That suggests national aggregate impaired driving cost estimates in other countries are substantial underestimates if they are based on all-crash unit costs. PMID:24406941

  14. Development of weight and cost estimates for lifting surfaces with active controls

    NASA Technical Reports Server (NTRS)

    Anderson, R. D.; Flora, C. C.; Nelson, R. M.; Raymond, E. T.; Vincent, J. H.

    1976-01-01

    Equations and methodology were developed for estimating the weight and cost incrementals due to active controls added to the wing and horizontal tail of a subsonic transport airplane. The methods are sufficiently generalized to be suitable for preliminary design. Supporting methodology and input specifications for the weight and cost equations are provided. The weight and cost equations are structured to be flexible in terms of the active control technology (ACT) flight control system specification. In order to present a self-contained package, methodology is also presented for generating ACT flight control system characteristics for the weight and cost equations. Use of the methodology is illustrated.

  15. Cost analysis and facility reimbursement in the long-term health care industry.

    PubMed Central

    Ullmann, S G

    1984-01-01

    This article examines costs and develops a system of prospective reimbursement for the industry committed to long-term health care. Together with estimates of average cost functions--for purposes of determining those factors affecting the costs of long-term health care, the author examines in depth the cost effects of patient mix and facility quality. Policy implications are indicated. The article estimates cost savings and predicted improvements in facility performance resulting from adoption of a prospective reimbursement system. PMID:6427138

  16. Annual Direct Medical Costs of Diabetic Foot Disease in Brazil: A Cost of Illness Study.

    PubMed

    Toscano, Cristiana M; Sugita, Tatiana H; Rosa, Michelle Q M; Pedrosa, Hermelinda C; Rosa, Roger Dos S; Bahia, Luciana R

    2018-01-08

    The aim of this study was to estimate the annual costs for the treatment of diabetic foot disease (DFD) in Brazil. We conducted a cost-of-illness study of DFD in 2014, while considering the Brazilian Public Healthcare System (SUS) perspective. Direct medical costs of outpatient management and inpatient care were considered. For outpatient costs, a panel of experts was convened from which utilization of healthcare services for the management of DFD was obtained. When considering the range of syndromes included in the DFD spectrum, we developed four well-defined hypothetical DFD cases: (1) peripheral neuropathy without ulcer, (2) non-infected foot ulcer, (3) infected foot ulcer, and (4) clinical management of amputated patients. Quantities of each healthcare service was then multiplied by their respective unit costs obtained from national price listings. We then developed a decision analytic tree to estimate nationwide costs of DFD in Brazil, while taking into the account the estimated cost per case and considering epidemiologic parameters obtained from a national survey, secondary data, and the literature. For inpatient care, ICD10 codes related to DFD were identified and costs of hospitalizations due to osteomyelitis, amputations, and other selected DFD related conditions were obtained from a nationwide hospitalization database. Direct medical costs of DFD in Brazil was estimated considering the 2014 purchasing power parity (PPP) (1 Int$ = 1.748 BRL). We estimated that the annual direct medical costs of DFD in 2014 was Int$ 361 million, which denotes 0.31% of public health expenses for this period. Of the total, Int$ 27.7 million (13%) was for inpatient, and Int$ 333.5 million (87%) for outpatient care. Despite using different methodologies to estimate outpatient and inpatient costs related to DFD, this is the first study to assess the overall economic burden of DFD in Brazil, while considering all of its syndromes and both outpatients and inpatients. Although we have various reasons to believe that the hospital costs are underestimated, the estimated DFD burden is significant. As such, public health preventive strategies to reduce DFD related morbidity and mortality and costs are of utmost importance.

  17. Introduction of the Tools for Economic Analysis of Patient Management Interventions in Heart Failure Costing Tool: a user-friendly spreadsheet program to estimate costs of providing patient-centered interventions.

    PubMed

    Reed, Shelby D; Li, Yanhong; Kamble, Shital; Polsky, Daniel; Graham, Felicia L; Bowers, Margaret T; Samsa, Gregory P; Paul, Sara; Schulman, Kevin A; Whellan, David J; Riegel, Barbara J

    2012-01-01

    Patient-centered health care interventions, such as heart failure disease management programs, are under increasing pressure to demonstrate good value. Variability in costing methods and assumptions in economic evaluations of such interventions limit the comparability of cost estimates across studies. Valid cost estimation is critical to conducting economic evaluations and for program budgeting and reimbursement negotiations. Using sound economic principles, we developed the Tools for Economic Analysis of Patient Management Interventions in Heart Failure (TEAM-HF) Costing Tool, a spreadsheet program that can be used by researchers and health care managers to systematically generate cost estimates for economic evaluations and to inform budgetary decisions. The tool guides users on data collection and cost assignment for associated personnel, facilities, equipment, supplies, patient incentives, miscellaneous items, and start-up activities. The tool generates estimates of total program costs, cost per patient, and cost per week and presents results using both standardized and customized unit costs for side-by-side comparisons. Results from pilot testing indicated that the tool was well-formatted, easy to use, and followed a logical order. Cost estimates of a 12-week exercise training program in patients with heart failure were generated with the costing tool and were found to be consistent with estimates published in a recent study. The TEAM-HF Costing Tool could prove to be a valuable resource for researchers and health care managers to generate comprehensive cost estimates of patient-centered interventions in heart failure or other conditions for conducting high-quality economic evaluations and making well-informed health care management decisions.

  18. Introduction of the TEAM-HF Costing Tool: A User-Friendly Spreadsheet Program to Estimate Costs of Providing Patient-Centered Interventions

    PubMed Central

    Reed, Shelby D.; Li, Yanhong; Kamble, Shital; Polsky, Daniel; Graham, Felicia L.; Bowers, Margaret T.; Samsa, Gregory P.; Paul, Sara; Schulman, Kevin A.; Whellan, David J.; Riegel, Barbara J.

    2011-01-01

    Background Patient-centered health care interventions, such as heart failure disease management programs, are under increasing pressure to demonstrate good value. Variability in costing methods and assumptions in economic evaluations of such interventions limit the comparability of cost estimates across studies. Valid cost estimation is critical to conducting economic evaluations and for program budgeting and reimbursement negotiations. Methods and Results Using sound economic principles, we developed the Tools for Economic Analysis of Patient Management Interventions in Heart Failure (TEAM-HF) Costing Tool, a spreadsheet program that can be used by researchers or health care managers to systematically generate cost estimates for economic evaluations and to inform budgetary decisions. The tool guides users on data collection and cost assignment for associated personnel, facilities, equipment, supplies, patient incentives, miscellaneous items, and start-up activities. The tool generates estimates of total program costs, cost per patient, and cost per week and presents results using both standardized and customized unit costs for side-by-side comparisons. Results from pilot testing indicated that the tool was well-formatted, easy to use, and followed a logical order. Cost estimates of a 12-week exercise training program in patients with heart failure were generated with the costing tool and were found to be consistent with estimates published in a recent study. Conclusions The TEAM-HF Costing Tool could prove to be a valuable resource for researchers and health care managers to generate comprehensive cost estimates of patient-centered interventions in heart failure or other conditions for conducting high-quality economic evaluations and making well-informed health care management decisions. PMID:22147884

  19. Space Station Furnace Facility. Volume 3: Program cost estimate

    NASA Technical Reports Server (NTRS)

    1992-01-01

    The approach used to estimate costs for the Space Station Furnace Facility (SSFF) is based on a computer program developed internally at Teledyne Brown Engineering (TBE). The program produces time-phased estimates of cost elements for each hardware component, based on experience with similar components. Engineering estimates of the degree of similarity or difference between the current project and the historical data is then used to adjust the computer-produced cost estimate and to fit it to the current project Work Breakdown Structure (WBS). The SSFF Concept as presented at the Requirements Definition Review (RDR) was used as the base configuration for the cost estimate. This program incorporates data on costs of previous projects and the allocation of those costs to the components of one of three, time-phased, generic WBS's. Input consists of a list of similar components for which cost data exist, number of interfaces with their type and complexity, identification of the extent to which previous designs are applicable, and programmatic data concerning schedules and miscellaneous data (travel, off-site assignments). Output is program cost in labor hours and material dollars, for each component, broken down by generic WBS task and program schedule phase.

  20. Cost-savings for biosimilars in the United States: a theoretical framework and budget impact case study application using filgrastim.

    PubMed

    Grewal, Simrun; Ramsey, Scott; Balu, Sanjeev; Carlson, Josh J

    2018-05-18

    Biosimilars can directly reduce the cost of treating patients for whom a reference biologic is indicated by offering a highly similar, lower priced alternative. We examine factors related to biosimilar regulatory approval, uptake, pricing, and financing and the potential impact on drug expenditures in the U.S. We developed a framework to illustrate how key factors including regulatory policies, provider and patient perception, pricing, and payer policies impact biosimilar cost-savings. Further, we developed a budget impact cost model to estimate savings from filgrastim biosimilars under various scenarios. The model uses publicly available data on disease incidence, treatment patterns, market share, and drug prices to estimate the cost-savings over a 5-year time horizon. We estimate five-year cost savings of $256 million, of which 18% ($47 million) are from reduced patient out-of-pocket costs, 34% ($86 million) are savings to commercial payers, and 48% ($123 million) are savings for Medicare. Additional scenarios demonstrate the impact of uncertain factors, including price, uptake, and financing policies. A variety or interrelated factors influence the development, uptake, and cost-savings for Biosimilars use in the U.S. The filgrastim case is a useful example that illustrates these factors and the potential magnitude of costs savings.

  1. The Effect of Infrastructure Sharing in Estimating Operations Cost of Future Space Transportation Systems

    NASA Technical Reports Server (NTRS)

    Sundaram, Meenakshi

    2005-01-01

    NASA and the aerospace industry are extremely serious about reducing the cost and improving the performance of launch vehicles both manned or unmanned. In the aerospace industry, sharing infrastructure for manufacturing more than one type spacecraft is becoming a trend to achieve economy of scale. An example is the Boeing Decatur facility where both Delta II and Delta IV launch vehicles are made. The author is not sure how Boeing estimates the costs of each spacecraft made in the same facility. Regardless of how a contractor estimates the cost, NASA in its popular cost estimating tool, NASA Air force Cost Modeling (NAFCOM) has to have a method built in to account for the effect of infrastructure sharing. Since there is no provision in the most recent version of NAFCOM2002 to take care of this, it has been found by the Engineering Cost Community at MSFC that the tool overestimates the manufacturing cost by as much as 30%. Therefore, the objective of this study is to develop a methodology to assess the impact of infrastructure sharing so that better operations cost estimates may be made.

  2. Highway User Benefit Analysis System Research Project #128

    DOT National Transportation Integrated Search

    2000-10-01

    In this research, a methodology for estimating road user costs of various competing alternatives was developed. Also, software was developed to calculate the road user cost, perform economic analysis and update cost tables. The methodology is based o...

  3. Stochastic Estimation of Cost Frontier: Evidence from Bangladesh

    ERIC Educational Resources Information Center

    Mamun, Shamsul Arifeen Khan

    2012-01-01

    In the literature of higher education cost function study, enough knowledge is created in the area of economy scale in the context of developed countries but the knowledge of input demand is lacking. On the other hand, empirical knowledge in the context of developing countries is very meagre. The paper fills up the knowledge gap, estimating a…

  4. Cost Estimates by Program Mechanism, Appendix K. Vol. II, A Plan for Managing the Development, Implementation and Operation of a Model Elementary Teacher Education Program.

    ERIC Educational Resources Information Center

    Cole, R. D.; Hamreus, D. G.

    This appendix presents the following tables of program component cost estimates: 1) instructional design and development; 2) instructional operations; 3) program management--policy creation and adoption, and policy and program execution; 4) program coordination--instructional objectives, adaptation, accommodation, and dissemination; 5) general…

  5. Cost analysis in support of minimum energy standards for clothes washers and dryers

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1979-02-02

    The results of the cost analysis of energy conservation design options for laundry products are presented. The analysis was conducted using two approaches. The first, is directed toward the development of industrial engineering cost estimates of each energy conservation option. This approach results in the estimation of manufacturers costs. The second approach is directed toward determining the market price differential of energy conservation features. The results of this approach are shown. The market cost represents the cost to the consumer. It is the final cost, and therefore includes distribution costs as well as manufacturing costs.

  6. Modeling Operations Costs for Human Exploration Architectures

    NASA Technical Reports Server (NTRS)

    Shishko, Robert

    2013-01-01

    Operations and support (O&S) costs for human spaceflight have not received the same attention in the cost estimating community as have development costs. This is unfortunate as O&S costs typically comprise a majority of life-cycle costs (LCC) in such programs as the International Space Station (ISS) and the now-cancelled Constellation Program. Recognizing this, the Constellation Program and NASA HQs supported the development of an O&S cost model specifically for human spaceflight. This model, known as the Exploration Architectures Operations Cost Model (ExAOCM), provided the operations cost estimates for a variety of alternative human missions to the moon, Mars, and Near-Earth Objects (NEOs) in architectural studies. ExAOCM is philosophically based on the DoD Architecture Framework (DoDAF) concepts of operational nodes, systems, operational functions, and milestones. This paper presents some of the historical background surrounding the development of the model, and discusses the underlying structure, its unusual user interface, and lastly, previous examples of its use in the aforementioned architectural studies.

  7. The economic burden of child sexual abuse in the United States.

    PubMed

    Letourneau, Elizabeth J; Brown, Derek S; Fang, Xiangming; Hassan, Ahmed; Mercy, James A

    2018-05-01

    The present study provides an estimate of the U.S. economic impact of child sexual abuse (CSA). Costs of CSA were measured from the societal perspective and include health care costs, productivity losses, child welfare costs, violence/crime costs, special education costs, and suicide death costs. We separately estimated quality-adjusted life year (QALY) losses. For each category, we used the best available secondary data to develop cost per case estimates. All costs were estimated in U.S. dollars and adjusted to the reference year 2015. Estimating 20 new cases of fatal and 40,387 new substantiated cases of nonfatal CSA that occurred in 2015, the lifetime economic burden of CSA is approximately $9.3 billion, the lifetime cost for victims of fatal CSA per female and male victim is on average $1,128,334 and $1,482,933, respectively, and the average lifetime cost for victims of nonfatal CSA is of $282,734 per female victim. For male victims of nonfatal CSA, there was insufficient information on productivity losses, contributing to a lower average estimated lifetime cost of $74,691 per male victim. If we included QALYs, these costs would increase by approximately $40,000 per victim. With the exception of male productivity losses, all estimates were based on robust, replicable incidence-based costing methods. The availability of accurate, up-to-date estimates should contribute to policy analysis, facilitate comparisons with other public health problems, and support future economic evaluations of CSA-specific policy and practice. In particular, we hope the availability of credible and contemporary estimates will support increased attention to primary prevention of CSA. Copyright © 2018. Published by Elsevier Ltd.

  8. A Low Cost Approach to Simultaneous Orbit, Attitude, and Rate Estimation Using an Extended Kalman Filter

    NASA Technical Reports Server (NTRS)

    Deutschmann, Julie; Harman, Rick; Bar-Itzhack, Itzhack

    1998-01-01

    An innovative approach to autonomous attitude and trajectory estimation is available using only magnetic field data and rate data. The estimation is performed simultaneously using an Extended Kalman Filter, a well known algorithm used extensively in onboard applications. The magnetic field is measured on a satellite by a magnetometer, an inexpensive and reliable sensor flown on virtually all satellites in low earth orbit. Rate data is provided by a gyro, which can be costly. This system has been developed and successfully tested in a post-processing mode using magnetometer and gyro data from 4 satellites supported by the Flight Dynamics Division at Goddard. In order for this system to be truly low cost, an alternative source for rate data must be utilized. An independent system which estimate spacecraft rate has been successfully developed and tested using only magnetometer data or a combination of magnetometer data and sun sensor data, which is less costly than a gyro. This system also uses an Extended Kalman Filter. Merging the two systems will provide an extremely low cost, autonomous approach to attitude and trajectory estimation. In this work we provide the theoretical background of the combined system. The measurement matrix is developed by combining the measurement matrix of the orbit and attitude estimation EKF with the measurement matrix of the rate estimation EKF, which is composed of a pseudo-measurement which makes the effective measurement a function of the angular velocity. Associated with this is the development of the noise covariance matrix associated with the original measurement combined with the new pseudo-measurement. In addition, the combination of the dynamics from the two systems is presented along with preliminary test results.

  9. A low cost approach to simultaneous orbit, attitude, and rate estimation using an extended Kalman filter

    NASA Technical Reports Server (NTRS)

    Deutschmann, Julie; Harman, Rick; Bar-Itzhack, Itzhack

    1998-01-01

    An innovative approach to autonomous attitude and trajectory estimation is available using only magnetic field data and rate data. The estimation is performed simultaneously using an Extended Kalman Filter (EKF), a well known algorithm used extensively in onboard applications. The magnetic field is measured on a satellite by a magnetometer, an inexpensive and reliable sensor flown on virtually all satellites in low earth orbit. Rate data is provided by a gyro, which can be costly. This system has been developed and successfully tested in a post-processing mode using magnetometer and gyro data from 4 satellites supported by the Flight Dynamics Division at Goddard. In order for this system to be truly low cost, an alternative source for rate data must be utilized. An independent system which estimates spacecraft rate has been successfully developed and tested using only magnetometer data or a combination of magnetometer data and sun sensor data, which is less costly than a gyro. This system also uses an EKF. Merging the two systems will provide an extremely low cost, autonomous approach to attitude and trajectory estimation. In this work we provide the theoretical background of the combined system. The measurement matrix is developed by combining the measurement matrix of the orbit and attitude estimation EKF with the measurement matrix of the rate estimation EKF, which is composed of a pseudo-measurement which makes the effective measurement a function of the angular velocity. Associated with this is the development of the noise covariance matrix associated with the original measurement combined with the new pseudo-measurement. In addition, the combination of the dynamics from the two systems is presented along with preliminary test results.

  10. Estimating the Cost and Payment for Sanitation in the Informal Settlements of Kisumu, Kenya: A Cross Sectional Study.

    PubMed

    Simiyu, Sheillah; Swilling, Mark; Rheingans, Richard; Cairncross, Sandy

    2017-01-06

    Lack of sanitation facilities is a common occurrence in informal settlements that are common in most developing countries. One challenge with sanitation provision in these settlements is the cost and financing of sanitation. This study aimed at estimating the cost of sanitation, and investigating the social and economic dynamics within Kisumu's informal settlements that hinder provision and uptake of sanitation facilities. Primary data was collected from residents of the settlements, and using logistic and hedonic regression analysis, we identify characteristics of residents with sanitation facilities, and estimate the cost of sanitation as revealed in rental prices. Our study finds that sanitation constitutes approximately 54% of the rent paid in the settlements; and dynamics such as landlords and tenants preferences, and sharing of sanitation facilities influence provision and payment for sanitation. This study contributes to general development by estimating the cost of sanitation, and further identifies barriers and opportunities for improvement including the interplay between landlords and tenants. Provision of sanitation in informal settlements is intertwined in social and economic dynamics, and development approaches should target both landlords and tenants, while also engaging various stakeholders to work together to identify affordable and appropriate sanitation technologies.

  11. Estimating the Cost and Payment for Sanitation in the Informal Settlements of Kisumu, Kenya: A Cross Sectional Study

    PubMed Central

    Simiyu, Sheillah; Swilling, Mark; Rheingans, Richard; Cairncross, Sandy

    2017-01-01

    Lack of sanitation facilities is a common occurrence in informal settlements that are common in most developing countries. One challenge with sanitation provision in these settlements is the cost and financing of sanitation. This study aimed at estimating the cost of sanitation, and investigating the social and economic dynamics within Kisumu’s informal settlements that hinder provision and uptake of sanitation facilities. Primary data was collected from residents of the settlements, and using logistic and hedonic regression analysis, we identify characteristics of residents with sanitation facilities, and estimate the cost of sanitation as revealed in rental prices. Our study finds that sanitation constitutes approximately 54% of the rent paid in the settlements; and dynamics such as landlords and tenants preferences, and sharing of sanitation facilities influence provision and payment for sanitation. This study contributes to general development by estimating the cost of sanitation, and further identifies barriers and opportunities for improvement including the interplay between landlords and tenants. Provision of sanitation in informal settlements is intertwined in social and economic dynamics, and development approaches should target both landlords and tenants, while also engaging various stakeholders to work together to identify affordable and appropriate sanitation technologies. PMID:28067812

  12. The budget impact and cost-effectiveness of defibrotide for treatment of veno-occlusive disease with multi-organ dysfunction in patients post-hematopoietic stem cell transplant.

    PubMed

    Veenstra, David L; Guzauskas, Gregory F; Villa, Kathleen F; Boudreau, Denise M

    2017-05-01

    A Phase-3 study of defibrotide compared with historical controls demonstrated a 23% improvement in 100-day survival post-hematopoietic stem cell transplantation (HSCT) among patients with veno-occlusive disease with multi-organ dysfunction (VOD with MOD). To estimate the budget impact and cost-effectiveness of introducing defibrotide to a transplant center. The authors developed a budget impact model from the perspective of a bone-marrow transplant center. It was estimated that 2.3% of adults and 4.2% of children would develop VOD with MOD following HSCT based on a retrospective hospital database analysis and the effect that treating patients with defibrotide would have on costs for adult and pediatric centers was estimated. A cost-utility analysis (CUA) was also developed to capture the long-term cost-effectiveness of defibrotide. Projected life expectancies in the two groups were estimated based on trial data, transplant registry data, studies of long-term survival among HSCT patients, and US population life-tables. There was an estimated 3% increase ($330,706) per year in total adult transplantation center costs associated with adopting defibrotide, and a <1% increase ($106,385) for pediatric transplant centers, assuming 100 transplants per year. In the CUA, the lifetime increase in cost per patient was $106,928, life expectancy increased by 3.74 years, and quality-adjusted life-years (QALYs) increased by 2.24. The incremental cost-effectiveness ratio (ICER) was $47,736 per QALY gained; 88% probability defibrotide was cost-effective at a $100,000/QALY threshold. The budget impact of defibrotide for a transplant center is relatively modest compared to the overall cost of transplantation. Defibrotide provides an important survival advantage for VOD with MOD patients, and the life years gained lead to defibrotide being highly cost-effective.

  13. A Life-Cycle Cost Estimating Methodology for NASA-Developed Air Traffic Control Decision Support Tools

    NASA Technical Reports Server (NTRS)

    Wang, Jianzhong Jay; Datta, Koushik; Landis, Michael R. (Technical Monitor)

    2002-01-01

    This paper describes the development of a life-cycle cost (LCC) estimating methodology for air traffic control Decision Support Tools (DSTs) under development by the National Aeronautics and Space Administration (NASA), using a combination of parametric, analogy, and expert opinion methods. There is no one standard methodology and technique that is used by NASA or by the Federal Aviation Administration (FAA) for LCC estimation of prospective Decision Support Tools. Some of the frequently used methodologies include bottom-up, analogy, top-down, parametric, expert judgement, and Parkinson's Law. The developed LCC estimating methodology can be visualized as a three-dimensional matrix where the three axes represent coverage, estimation, and timing. This paper focuses on the three characteristics of this methodology that correspond to the three axes.

  14. Cost of services provided by the National Breast and Cervical Cancer Early Detection Program.

    PubMed

    Ekwueme, Donatus U; Subramanian, Sujha; Trogdon, Justin G; Miller, Jacqueline W; Royalty, Janet E; Li, Chunyu; Guy, Gery P; Crouse, Wesley; Thompson, Hope; Gardner, James G

    2014-08-15

    The National Breast and Cervical Cancer Early Detection Program (NBCCEDP) is the largest cancer screening program for low-income women in the United States. This study updates previous estimates of the costs of delivering preventive cancer screening services in the NBCCEDP. We developed a standardized web-based cost-assessment tool to collect annual activity-based cost data on screening for breast and cervical cancer in the NBCCEDP. Data were collected from 63 of the 66 programs that received funding from the Centers for Disease Control and Prevention during the 2006/2007 fiscal year. We used these data to calculate costs of delivering preventive public health services in the program. We estimated the total cost of all NBCCEDP services to be $296 (standard deviation [SD], $123) per woman served (including the estimated value of in-kind donations, which constituted approximately 15% of this total estimated cost). The estimated cost of screening and diagnostic services was $145 (SD, $38) per women served, which represented 57.7% of the total cost excluding the value of in-kind donations. Including the value of in-kind donations, the weighted mean cost of screening a woman for breast cancer was $110 with an office visit and $88 without, the weighted mean cost of a diagnostic procedure was $401, and the weighted mean cost per breast cancer detected was $35,480. For cervical cancer, the corresponding cost estimates were $61, $21, $415, and $18,995, respectively. These NBCCEDP cost estimates may help policy makers in planning and implementing future costs for various potential changes to the program. © 2014 American Cancer Society.

  15. Update on Multi-Variable Parametric Cost Models for Ground and Space Telescopes

    NASA Technical Reports Server (NTRS)

    Stahl, H. Philip; Henrichs, Todd; Luedtke, Alexander; West, Miranda

    2012-01-01

    Parametric cost models can be used by designers and project managers to perform relative cost comparisons between major architectural cost drivers and allow high-level design trades; enable cost-benefit analysis for technology development investment; and, provide a basis for estimating total project cost between related concepts. This paper reports on recent revisions and improvements to our ground telescope cost model and refinements of our understanding of space telescope cost models. One interesting observation is that while space telescopes are 50X to 100X more expensive than ground telescopes, their respective scaling relationships are similar. Another interesting speculation is that the role of technology development may be different between ground and space telescopes. For ground telescopes, the data indicates that technology development tends to reduce cost by approximately 50% every 20 years. But for space telescopes, there appears to be no such cost reduction because we do not tend to re-fly similar systems. Thus, instead of reducing cost, 20 years of technology development may be required to enable a doubling of space telescope capability. Other findings include: mass should not be used to estimate cost; spacecraft and science instrument costs account for approximately 50% of total mission cost; and, integration and testing accounts for only about 10% of total mission cost.

  16. Cost collection and analysis for health economic evaluation.

    PubMed

    Smith, Kristine A; Rudmik, Luke

    2013-08-01

    To improve the understanding of common health care cost collection, estimation, analysis, and reporting methodologies. Ovid MEDLINE (1947 to December 2012), Cochrane Central register of Controlled Trials, Database of Systematic Reviews, Health Technology Assessment, and National Health Service Economic Evaluation Database. This article discusses the following cost collection methods: defining relevant resources, quantification of consumed resources, and resource valuation. It outlines the recommendations for cost reporting in economic evaluations and reviews the techniques on how to handle cost data uncertainty. Last, it discusses the controversial topics of future costs and patient productivity losses. Health care cost collection and estimation can be challenging, and an organized approach is required to optimize accuracy of economic evaluation outcomes. Understanding health care cost collection and estimation techniques will improve both critical appraisal and development of future economic evaluations.

  17. Parametric study of transport aircraft systems cost and weight

    NASA Technical Reports Server (NTRS)

    Beltramo, M. N.; Trapp, D. L.; Kimoto, B. W.; Marsh, D. P.

    1977-01-01

    The results of a NASA study to develop production cost estimating relationships (CERs) and weight estimating relationships (WERs) for commercial and military transport aircraft at the system level are presented. The systems considered correspond to the standard weight groups defined in Military Standard 1374 and are listed. These systems make up a complete aircraft exclusive of engines. The CER for each system (or CERs in several cases) utilize weight as the key parameter. Weights may be determined from detailed weight statements, if available, or by using the WERs developed, which are based on technical and performance characteristics generally available during preliminary design. The CERs that were developed provide a very useful tool for making preliminary estimates of the production cost of an aircraft. Likewise, the WERs provide a very useful tool for making preliminary estimates of the weight of aircraft based on conceptual design information.

  18. Oil Production Capacity Expansion Costs for the Persian Gulf

    EIA Publications

    1996-01-01

    Provides estimates of development and operating costs for various size fields in countries surrounding the Persian Gulf. In addition, a forecast of the required reserve development and associated costs to meet the expected demand through the year 2010 is presented.

  19. Estimating the Full Cost of Family-Financed Time Inputs to Education.

    ERIC Educational Resources Information Center

    Levine, Victor

    This paper presents a methodology for estimating the full cost of parental time allocated to child-care activities at home. Building upon the human capital hypothesis, a model is developed in which the cost of an hour diverted from labor market activity is seen as consisting of three components: 1) direct wages foregone; 2) investments in…

  20. Lifecycle Cost Analysis of Green Infrastructure. U.S. EPA National Stormwater Calculator: Low Impact Development Stormwater Control Cost Estimation Module & Future Enhancements

    EPA Science Inventory

    This presentation will cover the new cost estimation module of the US EPA National Stormwater Calculator and future enhancements, including a new mobile web app version of the tool. The presentation mainly focuses on how the calculator may be used to provide planning level capita...

  1. Offshore Wind Plant Balance-of-Station Cost Drivers and Sensitivities (Poster)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Saur, G.; Maples, B.; Meadows, B.

    2012-09-01

    With Balance of System (BOS) costs contributing up to 70% of the installed capital cost, it is fundamental to understanding the BOS costs for offshore wind projects as well as potential cost trends for larger offshore turbines. NREL developed a BOS model using project cost estimates developed by GL Garrad Hassan. Aspects of BOS covered include engineering and permitting, ports and staging, transportation and installation, vessels, foundations, and electrical. The data introduce new scaling relationships for each BOS component to estimate cost as a function of turbine parameters and size, project parameters and size, and soil type. Based on themore » new BOS model, an analysis to understand the non-turbine costs associated with offshore turbine sizes ranging from 3 MW to 6 MW and offshore wind plant sizes ranging from 100 MW to 1000 MW has been conducted. This analysis establishes a more robust baseline cost estimate, identifies the largest cost components of offshore wind project BOS, and explores the sensitivity of the levelized cost of energy to permutations in each BOS cost element. This presentation shows results from the model that illustrates the potential impact of turbine size and project size on the cost of energy from US offshore wind plants.« less

  2. Determining the influence of past development experience on the cost of strategic ballistic missile development

    NASA Astrophysics Data System (ADS)

    Whitney, Dwight E.

    The influence of learning in the form of past relevant experience was examined in data collected for strategic ballistic missiles developed by the United States. A total of twenty-four new missiles were developed and entered service between 1954 and 1990. Missile development costs were collected and analyzed by regression analysis using the learning curve model with factors for past experience and other relevant cost estimating relationships. The purpose of the study was to determine whether prior development experience was a factor in the development cost of these like systems. Of the twenty-four missiles in the population, development costs for twelve of the missiles were collected from the literature. Since the costs were found to be segmented by military service, a discrete input variable for military service was used as one of the cost estimating relationships. Because there were only two US Navy samples, too few to analyze for segmentation and learning rate, they were excluded from the final analysis. The final analysis was on a sample of ten out of eighteen US Army and US Air Force missiles within the population. The result of the analysis found past experience to be a statistically significant factor in describing the development cost of the US Army and US Air Force missiles. The influence equated to a 0.86 progress ratio, indicating prior development experience had a positive (cost-reducing) influence on their development cost. Based on the result, it was concluded that prior development experience was a factor in the development cost of these systems.

  3. [Socioeconomic costs of food-borne disease using the cost-of-illness model: applying the QALY method].

    PubMed

    Shin, Hosung; Lee, Suehyung; Kim, Jong Soo; Kim, Jinsuk; Han, Kyu Hong

    2010-07-01

    This study estimated the annual socioeconomic costs of food-borne disease in 2008 from a societal perspective and using a cost-of-illness method. Our model employed a comprehensive set of diagnostic disease codes to define food-borne diseases with using the Korea National Health Insurance (KNHI) reimbursement data. This study classified the food borne illness as three types of symptoms according to the severity of the illness: mild, moderate, severe. In addition to the traditional method of assessing the cost-of-illness, the study included measures to account for the lost quality of life. We estimated the cost of the lost quality of life using quality-adjusted life years and a visual analog scale. The direct cost included medical and medication costs, and the non-medical costs included transportation costs, caregiver's cost and administration costs. The lost productivity costs included lost workdays due to illness and lost earnings due to premature death. The study found the estimated annual socioeconomic costs of food-borne disease in 2008 were 954.9 billion won (735.3 billion won-996.9 billion won). The medical cost was 73.4 - 76.8% of the cost, the lost productivity cost was 22.6% and the cost of the lost quality of life was 26.0%. Most of the cost-of-illness studies are known to have underestimated the actual socioeconomic costs of the subjects, and these studies excluded many important social costs, such as the value of pain, suffering and functional disability. The study addressed the uncertainty related to estimating the socioeconomic costs of food-borne disease as well as the updated cost estimates. Our estimates could contribute to develop and evaluate policies for food-borne disease.

  4. Economic Impacts of Non-Native Forest Insects in the Continental United States

    PubMed Central

    Aukema, Juliann E.; Leung, Brian; Kovacs, Kent; Chivers, Corey; Britton, Kerry O.; Englin, Jeffrey; Frankel, Susan J.; Haight, Robert G.; Holmes, Thomas P.; Liebhold, Andrew M.; McCullough, Deborah G.; Von Holle, Betsy

    2011-01-01

    Reliable estimates of the impacts and costs of biological invasions are critical to developing credible management, trade and regulatory policies. Worldwide, forests and urban trees provide important ecosystem services as well as economic and social benefits, but are threatened by non-native insects. More than 450 non-native forest insects are established in the United States but estimates of broad-scale economic impacts associated with these species are largely unavailable. We developed a novel modeling approach that maximizes the use of available data, accounts for multiple sources of uncertainty, and provides cost estimates for three major feeding guilds of non-native forest insects. For each guild, we calculated the economic damages for five cost categories and we estimated the probability of future introductions of damaging pests. We found that costs are largely borne by homeowners and municipal governments. Wood- and phloem-boring insects are anticipated to cause the largest economic impacts by annually inducing nearly $1.7 billion in local government expenditures and approximately $830 million in lost residential property values. Given observations of new species, there is a 32% chance that another highly destructive borer species will invade the U.S. in the next 10 years. Our damage estimates provide a crucial but previously missing component of cost-benefit analyses to evaluate policies and management options intended to reduce species introductions. The modeling approach we developed is highly flexible and could be similarly employed to estimate damages in other countries or natural resource sectors. PMID:21931766

  5. Compressed-air energy-storage preliminary design and site-development program in an aquifer. Volume 9: Cost estimate and schedule

    NASA Astrophysics Data System (ADS)

    1982-12-01

    The behavior and suitability of aquifers as compressed-air energy-storage sites is discussed. The engineering and construction schedule, facilities capital-cost estimate, and corresponding cash-flow requirements are given.

  6. Solar thermal technology development: Estimated market size and energy cost savings. Volume 1: Executive summary

    NASA Technical Reports Server (NTRS)

    Gates, W. R.

    1983-01-01

    Estimated future energy cost savings associated with the development of cost-competitive solar thermal technologies (STT) are discussed. Analysis is restricted to STT in electric applications for 16 high-insolation/high-energy-price states. The fuel price scenarios and three 1990 STT system costs are considered, reflecting uncertainty over future fuel prices and STT cost projections. STT R&D is found to be unacceptably risky for private industry in the absence of federal support. Energy cost savings were projected to range from $0 to $10 billion (1990 values in 1981 dollars), dependng on the system cost and fuel price scenario. Normal R&D investment risks are accentuated because the Organization of Petroleum Exporting Countries (OPEC) cartel can artificially manipulate oil prices and undercut growth of alternative energy sources. Federal participation in STT R&D to help capture the potential benefits of developing cost-competitive STT was found to be in the national interest.

  7. Solar thermal technology development: Estimated market size and energy cost savings. Volume 1: Executive summary

    NASA Astrophysics Data System (ADS)

    Gates, W. R.

    1983-02-01

    Estimated future energy cost savings associated with the development of cost-competitive solar thermal technologies (STT) are discussed. Analysis is restricted to STT in electric applications for 16 high-insolation/high-energy-price states. The fuel price scenarios and three 1990 STT system costs are considered, reflecting uncertainty over future fuel prices and STT cost projections. STT R&D is found to be unacceptably risky for private industry in the absence of federal support. Energy cost savings were projected to range from $0 to $10 billion (1990 values in 1981 dollars), dependng on the system cost and fuel price scenario. Normal R&D investment risks are accentuated because the Organization of Petroleum Exporting Countries (OPEC) cartel can artificially manipulate oil prices and undercut growth of alternative energy sources. Federal participation in STT R&D to help capture the potential benefits of developing cost-competitive STT was found to be in the national interest.

  8. Solar thermal technology development: Estimated market size and energy cost savings. Volume 2: Assumptions, methodology and results

    NASA Astrophysics Data System (ADS)

    Gates, W. R.

    1983-02-01

    Estimated future energy cost savings associated with the development of cost-competitive solar thermal technologies (STT) are discussed. Analysis is restricted to STT in electric applications for 16 high-insolation/high-energy-price states. Three fuel price scenarios and three 1990 STT system costs are considered, reflecting uncertainty over future fuel prices and STT cost projections. Solar thermal technology research and development (R&D) is found to be unacceptably risky for private industry in the absence of federal support. Energy cost savings were projected to range from $0 to $10 billion (1990 values in 1981 dollars), depending on the system cost and fuel price scenario. Normal R&D investment risks are accentuated because the Organization of Petroleum Exporting Countries (OPEC) cartel can artificially manipulate oil prices and undercut growth of alternative energy sources. Federal participation in STT R&D to help capture the potential benefits of developing cost-competitive STT was found to be in the national interest. Analysis is also provided regarding two federal incentives currently in use: The Federal Business Energy Tax Credit and direct R&D funding.

  9. Solar thermal technology development: Estimated market size and energy cost savings. Volume 2: Assumptions, methodology and results

    NASA Technical Reports Server (NTRS)

    Gates, W. R.

    1983-01-01

    Estimated future energy cost savings associated with the development of cost-competitive solar thermal technologies (STT) are discussed. Analysis is restricted to STT in electric applications for 16 high-insolation/high-energy-price states. Three fuel price scenarios and three 1990 STT system costs are considered, reflecting uncertainty over future fuel prices and STT cost projections. Solar thermal technology research and development (R&D) is found to be unacceptably risky for private industry in the absence of federal support. Energy cost savings were projected to range from $0 to $10 billion (1990 values in 1981 dollars), depending on the system cost and fuel price scenario. Normal R&D investment risks are accentuated because the Organization of Petroleum Exporting Countries (OPEC) cartel can artificially manipulate oil prices and undercut growth of alternative energy sources. Federal participation in STT R&D to help capture the potential benefits of developing cost-competitive STT was found to be in the national interest. Analysis is also provided regarding two federal incentives currently in use: The Federal Business Energy Tax Credit and direct R&D funding.

  10. Cotton yield estimation using very high-resolution digital images acquired on a low-cost small unmanned aerial vehicle

    USDA-ARS?s Scientific Manuscript database

    Yield estimation is a critical task in crop management. A number of traditional methods are available for crop yield estimation but they are costly, time-consuming and difficult to expand to a relatively large field. Remote sensing provides techniques to develop quick coverage over a field at any sc...

  11. Software cost/resource modeling: Deep space network software cost estimation model

    NASA Technical Reports Server (NTRS)

    Tausworthe, R. J.

    1980-01-01

    A parametric software cost estimation model prepared for JPL deep space network (DSN) data systems implementation tasks is presented. The resource estimation model incorporates principles and data from a number of existing models, such as those of the General Research Corporation, Doty Associates, IBM (Walston-Felix), Rome Air Force Development Center, University of Maryland, and Rayleigh-Norden-Putnam. The model calibrates task magnitude and difficulty, development environment, and software technology effects through prompted responses to a set of approximately 50 questions. Parameters in the model are adjusted to fit JPL software lifecycle statistics. The estimation model output scales a standard DSN work breakdown structure skeleton, which is then input to a PERT/CPM system, producing a detailed schedule and resource budget for the project being planned.

  12. Sensitivity analysis of add-on price estimate for select silicon wafering technologies

    NASA Technical Reports Server (NTRS)

    Mokashi, A. R.

    1982-01-01

    The cost of producing wafers from silicon ingots is a major component of the add-on price of silicon sheet. Economic analyses of the add-on price estimates and their sensitivity internal-diameter (ID) sawing, multiblade slurry (MBS) sawing and fixed-abrasive slicing technique (FAST) are presented. Interim price estimation guidelines (IPEG) are used for estimating a process add-on price. Sensitivity analysis of price is performed with respect to cost parameters such as equipment, space, direct labor, materials (blade life) and utilities, and the production parameters such as slicing rate, slices per centimeter and process yield, using a computer program specifically developed to do sensitivity analysis with IPEG. The results aid in identifying the important cost parameters and assist in deciding the direction of technology development efforts.

  13. Lives Saved Tool (LiST) costing: a module to examine costs and prioritize interventions.

    PubMed

    Bollinger, Lori A; Sanders, Rachel; Winfrey, William; Adesina, Adebiyi

    2017-11-07

    Achieving the Sustainable Development Goals will require careful allocation of resources in order to achieve the highest impact. The Lives Saved Tool (LiST) has been used widely to calculate the impact of maternal, neonatal and child health (MNCH) interventions for program planning and multi-country estimation in several Lancet Series commissions. As use of the LiST model increases, many have expressed a desire to cost interventions within the model, in order to support budgeting and prioritization of interventions by countries. A limited LiST costing module was introduced several years ago, but with gaps in cost types. Updates to inputs have now been added to make the module fully functional for a range of uses. This paper builds on previous work that developed an initial version of the LiST costing module to provide costs for MNCH interventions using an ingredients-based costing approach. Here, we update in 2016 the previous econometric estimates from 2013 with newly-available data and also include above-facility level costs such as program management. The updated econometric estimates inform percentages of intervention-level costs for some direct costs and indirect costs. These estimates add to existing values for direct cost requirements for items such as drugs and supplies and required provider time which were already available in LiST Costing. Results generated by the LiST costing module include costs for each intervention, as well as disaggregated costs by intervention including drug and supply costs, labor costs, other recurrent costs, capital costs, and above-service delivery costs. These results can be combined with mortality estimates to support prioritization of interventions by countries. The LiST costing module provides an option for countries to identify resource requirements for scaling up a maternal, neonatal, and child health program, and to examine the financial impact of different resource allocation strategies. It can be a useful tool for countries as they seek to identify the best investments for scarce resources. The purpose of the LiST model is to provide a tool to make resource allocation decisions in a strategic planning process through prioritizing interventions based on resulting impact on maternal and child mortality and morbidity.

  14. Social Costs of Gambling in the Czech Republic 2012.

    PubMed

    Winkler, Petr; Bejdová, Markéta; Csémy, Ladislav; Weissová, Aneta

    2017-12-01

    Evidence about social costs of gambling is scarce and the methodology for their calculation has been a subject to strong criticism. We aimed to estimate social costs of gambling in the Czech Republic 2012. This retrospective, prevalence based cost of illness study builds on the revised methodology of Australian Productivity Commission. Social costs of gambling were estimated by combining epidemiological and economic data. Prevalence data on negative consequences of gambling were taken from existing national epidemiological studies. Economic data were taken from various national and international sources. Consequences of problem and pathological gambling only were taken into account. In 2012, the social costs of gambling in the Czech Republic were estimated to range between 541,619 and 619,608 thousands EUR. While personal and family costs accounted for 63% of all social costs, direct medical costs were estimated to range from 0.25 to 0.28% of all social costs only. This is the first study which estimates social costs of gambling in any of the Central and East European countries. It builds upon the solid evidence about prevalence of gambling related problems in the Czech Republic and satisfactorily reliable economic data. However, there is a number of limitations stemming from assumptions that were made, which suggest that the methodology for the calculation of the social costs of gambling needs further development.

  15. SAMICS support study. Volume 1: Cost account catalog

    NASA Technical Reports Server (NTRS)

    1977-01-01

    The Jet Propulsion Laboratory (JPL) is examining the feasibility of a new industry to produce photovoltaic solar energy collectors similar to those used on spacecraft. To do this, a standardized costing procedure was developed. The Solar Array Manufacturing Industry Costing Standards (SAMICS) support study supplies the following information: (1) SAMICS critique; (2) Standard data base--cost account structure, expense item costs, inflation rates, indirect requirements relationships, and standard financial parameter values; (3) Facilities capital cost estimating relationships; (4) Conceptual plant designs; (5) Construction lead times; (6) Production start-up times; (7) Manufacturing price estimates.

  16. The Economic Costs of Substance Abuse Treatment: Updated Estimates and Cost Bands for Program Assessment and Reimbursement

    PubMed Central

    French, Michael T.; Popovici, Ioana; Tapsell, Lauren

    2008-01-01

    Federal, State, and local government agencies require current and accurate cost information for publicly funded substance abuse treatment programs to guide program assessments and reimbursement decisions. The Center for Substance Abuse Treatment (CSAT) published a list of modality-specific cost bands for this purpose in 2002. However, the upper and lower values in these ranges are so wide that they offer little practical guidance for funding agencies. Thus, the dual purpose of this investigation was to assemble the most current and comprehensive set of economic cost estimates from the readily-available literature and then use these estimates to develop updated modality-specific cost bands for more reasonable reimbursement policies. Although cost estimates were scant for some modalities, the recommended cost bands are based on the best available economic research, and we believe these new ranges will be more useful and pertinent for all stakeholders of publicly-funded substance abuse treatment. PMID:18294803

  17. Costing the supply chain for delivery of ACT and RDTs in the public sector in Benin and Kenya.

    PubMed

    Shretta, Rima; Johnson, Brittany; Smith, Lisa; Doumbia, Seydou; de Savigny, Don; Anupindi, Ravi; Yadav, Prashant

    2015-02-05

    Studies have shown that supply chain costs are a significant proportion of total programme costs. Nevertheless, the costs of delivering specific products are poorly understood and ballpark estimates are often used to inadequately plan for the budgetary implications of supply chain expenses. The purpose of this research was to estimate the country level costs of the public sector supply chain for artemisinin-based combination therapy (ACT) and rapid diagnostic tests (RDTs) from the central to the peripheral levels in Benin and Kenya. A micro-costing approach was used and primary data on the various cost components of the supply chain was collected at the central, intermediate, and facility levels between September and November 2013. Information sources included central warehouse databases, health facility records, transport schedules, and expenditure reports. Data from document reviews and semi-structured interviews were used to identify cost inputs and estimate actual costs. Sampling was purposive to isolate key variables of interest. Survey guides were developed and administered electronically. Data were extracted into Microsoft Excel, and the supply chain cost per unit of ACT and RDT distributed by function and level of system was calculated. In Benin, supply chain costs added USD 0.2011 to the initial acquisition cost of ACT and USD 0.3375 to RDTs (normalized to USD 1). In Kenya, they added USD 0.2443 to the acquisition cost of ACT and USD 0.1895 to RDTs (normalized to USD 1). Total supply chain costs accounted for more than 30% of the initial acquisition cost of the products in some cases and these costs were highly sensitive to product volumes. The major cost drivers were found to be labour, transport, and utilities with health facilities carrying the majority of the cost per unit of product. Accurate cost estimates are needed to ensure adequate resources are available for supply chain activities. Product volumes should be considered when costing supply chain functions rather than dollar value. Further work is needed to develop extrapolative costing models that can be applied at country level without extensive micro-costing exercises. This will allow other countries to generate more accurate estimates in the future.

  18. A Decision Support System for Planning, Control and Auditing of DoD Software Cost Estimation.

    DTIC Science & Technology

    1986-03-01

    is frequently used in U. S. Air Force software cost estimates. Barry Boehm’s Constructive Cost Estimation Model (COCOMO) was recently selected for use...are considered basic to the proper development of software. Pressman , [Ref. 11], addresses these basic elements in a manner which attempts to integrate...H., Jr., and Carlson, Eric D., Building E fective Decision SUDDOrt Systems, Prentice-Hal, EnglewoodNJ, 1982 11. Pressman , Roger S., o A Practioner’s A

  19. Parametric study of helicopter aircraft systems costs and weights

    NASA Technical Reports Server (NTRS)

    Beltramo, M. N.

    1980-01-01

    Weight estimating relationships (WERs) and recurring production cost estimating relationships (CERs) were developed for helicopters at the system level. The WERs estimate system level weight based on performance or design characteristics which are available during concept formulation or the preliminary design phase. The CER (or CERs in some cases) for each system utilize weight (either actual or estimated using the appropriate WER) and production quantity as the key parameters.

  20. Development and verification of a model for estimating the screening utility in the detection of PCBs in transformer oil.

    PubMed

    Terakado, Shingo; Glass, Thomas R; Sasaki, Kazuhiro; Ohmura, Naoya

    2014-01-01

    A simple new model for estimating the screening performance (false positive and false negative rates) of a given test for a specific sample population is presented. The model is shown to give good results on a test population, and is used to estimate the performance on a sampled population. Using the model developed in conjunction with regulatory requirements and the relative costs of the confirmatory and screening tests allows evaluation of the screening test's utility in terms of cost savings. Testers can use the methods developed to estimate the utility of a screening program using available screening tests with their own sample populations.

  1. Cost of Services Provided by the National Breast and Cervical Cancer Early Detection Program

    PubMed Central

    Ekwueme, Donatus U.; Subramanian, Sujha; Trogdon, Justin G.; Miller, Jacqueline W.; Royalty, Janet E.; Li, Chunyu; Guy, Gery P.; Crouse, Wesley; Thompson, Hope; Gardner, James G.

    2015-01-01

    BACKGROUND The National Breast and Cervical Cancer Early Detection Program (NBCCEDP) is the largest cancer screening program for low-income women in the United States. This study updates previous estimates of the costs of delivering preventive cancer screening services in the NBCCEDP. METHODS We developed a standardized web-based cost-assessment tool to collect annual activity-based cost data on screening for breast and cervical cancer in the NBCCEDP. Data were collected from 63 of the 66 programs that received funding from the Centers for Disease Control and Prevention during the 2006/2007 fiscal year. We used these data to calculate costs of delivering preventive public health services in the program. RESULTS We estimated the total cost of all NBCCEDP services to be $296 (standard deviation [SD], $123) per woman served (including the estimated value of in-kind donations, which constituted approximately 15% of this total estimated cost). The estimated cost of screening and diagnostic services was $145 (SD, $38) per women served, which represented 57.7% of the total cost excluding the value of in-kind donations. Including the value of in-kind donations, the weighted mean cost of screening a woman for breast cancer was $110 with an office visit and $88 without, the weighted mean cost of a diagnostic procedure was $401, and the weighted mean cost per breast cancer detected was $35,480. For cervical cancer, the corresponding cost estimates were $61, $21, $415, and $18,995, respectively. CONCLUSIONS These NBCCEDP cost estimates may help policy makers in planning and implementing future costs for various potential changes to the program. PMID:25099904

  2. Productivity and cost estimators for conventional ground-based skidding on steep terrain using preplanned skid roads

    Treesearch

    Michael D. Erickson; Curt C. Hassler; Chris B. LeDoux

    1991-01-01

    Continuous time and motion study techniques were used to develop productivity and cost estimators for the skidding component of ground-based logging systems, operating on steep terrain using preplanned skid roads. Comparisons of productivity and costs were analyzed for an overland random access skidding method, verses a skidding method utilizing a network of preplanned...

  3. A model for estimating the cost impact of schedule perturbations on aerospace research and development programs

    NASA Technical Reports Server (NTRS)

    Bishop, D. F.

    1972-01-01

    The problem of determining the cost impact attributable to perturbations in an aerospace R and D program schedule is discussed in terms of the diminishing availability of funds. The methodology from which a model is presented for updating R and D cost estimates as a function of perturbations in program time is presented.

  4. Users guide for STHARVEST: software to estimate the cost of harvesting small timber.

    Treesearch

    Roger D. Fight; Xiaoshan Zhang; Bruce R. Hartsough

    2003-01-01

    The STHARVEST computer application is Windows-based, public-domain software used to estimate costs for harvesting small-diameter stands or the small-diameter component of a mixed-sized stand. The equipment production rates were developed from existing studies. Equipment operating cost rates were based on November 1998 prices for new equipment and wage rates for the...

  5. Equations for estimating stand establishment, release, and thinning costs in the Lake States.

    Treesearch

    Jeffrey T. Olson; Allen L. Lundgren; Dietmar Rose

    1978-01-01

    Equations for estimating project costs for certain silvicultural treatments in the Lake States have been developed from project records of public forests. Treatments include machine site preparation, hand planting, aerial spraying, prescribed burning, manual release, and thinning.

  6. Advanced transportation system studies technical area 2 (TA-2): Heavy lift launch vehicle development. volume 3; Program Cost estimates

    NASA Technical Reports Server (NTRS)

    McCurry, J. B.

    1995-01-01

    The purpose of the TA-2 contract was to provide advanced launch vehicle concept definition and analysis to assist NASA in the identification of future launch vehicle requirements. Contracted analysis activities included vehicle sizing and performance analysis, subsystem concept definition, propulsion subsystem definition (foreign and domestic), ground operations and facilities analysis, and life cycle cost estimation. The basic period of performance of the TA-2 contract was from May 1992 through May 1993. No-cost extensions were exercised on the contract from June 1993 through July 1995. This document is part of the final report for the TA-2 contract. The final report consists of three volumes: Volume 1 is the Executive Summary, Volume 2 is Technical Results, and Volume 3 is Program Cost Estimates. The document-at-hand, Volume 3, provides a work breakdown structure dictionary, user's guide for the parametric life cycle cost estimation tool, and final report developed by ECON, Inc., under subcontract to Lockheed Martin on TA-2 for the analysis of heavy lift launch vehicle concepts.

  7. Aircraft ground damage and the use of predictive models to estimate costs

    NASA Astrophysics Data System (ADS)

    Kromphardt, Benjamin D.

    Aircraft are frequently involved in ground damage incidents, and repair costs are often accepted as part of doing business. The Flight Safety Foundation (FSF) estimates ground damage to cost operators $5-10 billion annually. Incident reports, documents from manufacturers or regulatory agencies, and other resources were examined to better understand the problem of ground damage in aviation. Major contributing factors were explained, and two versions of a computer-based model were developed to project costs and show what is possible. One objective was to determine if the models could match the FSF's estimate. Another objective was to better understand cost savings that could be realized by efforts to further mitigate the occurrence of ground incidents. Model effectiveness was limited by access to official data, and assumptions were used if data was not available. However, the models were determined to sufficiently estimate the costs of ground incidents.

  8. The common engine concept for ALS application - A cost reduction approach

    NASA Technical Reports Server (NTRS)

    Bair, E. K.; Schindler, C. M.

    1989-01-01

    Future launch systems require the application of propulsion systems which have been designed and developed to meet mission model needs while providing high degrees of reliability and cost effectiveness. Vehicle configurations which utilize different propellant combinations for booster and core stages can benefit from a common engine approach where a single engine design can be configured to operate on either set of propellants and thus serve as either a booster or core engine. Engine design concepts and mission application for a vehicle employing a common engine are discussed. Engine program cost estimates were made and cost savings, over the design and development of two unique engines, estimated.

  9. Estimated cost of a health visitor-led protocol for perinatal mental health.

    PubMed

    Oluboyede, Yemi; Lewis, Anne; Ilott, Irene; Lekka, Chrysanthi

    2010-06-01

    Anecdotally, protocols, care pathways and clinical guidelines are time consuming to develop and sustain, but there is little research about the actual costs of their development, use and audit.This is a notable gap considering the pervasiveness of such documents that are intended to reduce unacceptable variations in practice by standardising care processes. A case study research design was used to calculate the resource use costs of a protocol for perinatal mental health, part of the core programme for health visitors in a primary care trust in the west of England. The methods were in-depth interviews with the operational lead for the protocol (a health visitor) and documentary analysis. The total estimated cost of staff time over a five-year period (2004 to 2008) was Euro 73,598, comprising Euro 36,162 (49%) for development and Euro 37,436 (51%) for implementation. Although these are best estimates dependent upon retrospective data, they indicate the opportunity cost of staff time for a single protocol in one trust over five years. When new protocols, care pathways or clinical guidelines are proposed, the costs need to be considered and weighed against the benefits of engaging frontline staff in service improvements.

  10. The complications of trauma and their associated costs in a level I trauma center.

    PubMed

    O'Keefe, G E; Maier, R V; Diehr, P; Grossman, D; Jurkovich, G J; Conrad, D

    1997-08-01

    To estimate the expected costs for acute trauma care, to quantify the costs associated with the development of complications in injury victims, and to determine the deficit incurred by patients in whom complications develop. A retrospective, cohort design. A referral trauma center. A total of 12,088 patients admitted to a single regional trauma center during a period of 5 years. This is an observational study, and no interventions specific to this study are included in the design. (1) The expected costs for injury victims based on readily available clinical data. (2) The costs associated with the most important complications of trauma. (3) The effect of complications on inadequate reimbursement for trauma care. The expected costs were estimated using a linear model incorporating demographic variables and measures of injury severity. The expected costs averaged $14,567, and the observed costs averaged $15,032. Six complications were important predictors of cost. These included adult respiratory distress syndrome, acute kidney failure, sepsis, pneumonia, decubitus ulceration, and wound infections. For 1201 individuals with these complications, the predicted costs averaged $23,266 and the observed costs averaged $47,457. The mean excess costs for a single complication ranged from $6669 to $18,052. Multiple complications led to greater increases in excess cost, averaging $110,007 for the 62 patients with 3 or more complications. Costs exceeded reimbursement to a much greater degree in those in whom any of the 6 complications developed. Expected hospital costs can be estimated using admission clinical data. Each of 6 complications was associated with enormous increases in costs, indicating their importance as a cause of avoidable expenditures in injury victims and identifying situations in which reimbursement may not be adequate.

  11. A model to estimate the cost of the National Essential Public Health Services Package in Beijing, China.

    PubMed

    Yin, Delu; Wong, Sabrina T; Chen, Wei; Xin, Qianqian; Wang, Lihong; Cui, Mingming; Yin, Tao; Li, Ruili; Zheng, Xiaoguo; Yang, Huiming; Yu, Juanjuan; Chen, Bowen; Yang, Weizhong

    2015-06-06

    In order to address several health challenges, the Chinese government issued the National Essential Public Health Services Package (NEPHSP) in 2009. In China's large cities, the lack of funding for community health centers and consequent lack of comprehensive services and high quality care has become a major challenge. However, no study has been carried out to estimate the cost of delivering the services in the package. This project was to develop a cost estimation approach appropriate to the context and use it to calculate the cost of the NEPHSP in Beijing in 2011. By adjusting models of cost analysis of primary health care and workload indicators of staffing need developed by the World Health Organization, a model was developed to estimate the cost of the services in the package through an intensive interactive process. A total of 17 community health centers from eight administrative districts in Beijing were selected. Their service volume and expenditure data in 2010 were used to evaluate the costs of providing the NEPHSP in Beijing based on the applied model. The total workload of all types of primary health care in 17 sample centers was equivalent to the workload requirement for 14,056,402 standard clinic visits. The total expenditure of the 17 sample centers was 26,329,357.62 USD in 2010. The cost of the workload requirement of one standard clinic visit was 1.87 USD. The workload of the NEPHSP was equivalent to 5,514,777 standard clinic visits (39.23 % of the total workload). The model suggests that the cost of the package in Beijing was 7.95 USD per capita in 2010. The cost of the NEPHSP in urban areas was lower than suburban areas: 7.31 and 8.65 USD respectively. The average investment of 3.97 USD per capita in NEPHSP was lower than the amount needed to meet its running costs. NEPHSP in Beijing is therefore underfunded. Additional investment is needed, and a dynamic cost estimate mechanism should be introduced to ensure services remain adequately funded.

  12. Time cost of child rearing and its effect on women's uptake of free health checkups in Japan.

    PubMed

    Anezaki, Hisataka; Hashimoto, Hideki

    2018-05-01

    Women of child-rearing age have the lowest uptake rates for health checkups in several developed countries. The time cost incurred by conflicting child-rearing roles may contribute to this gap in access to health checkups. We estimated the time cost of child rearing empirically, and analyzed its potential impact on uptake of free health checkups based on a sample of 1606 women with a spouse/partner from the dataset of a population-based survey conducted in the greater Tokyo metropolitan area in 2010. We used a selection model to estimate the counterfactual wage of non-working mothers, and estimated the number of children using a simultaneous equation model to account for the endogeneity between job participation and child rearing. The time cost of child rearing was obtained based on the estimated effects of women's wages and number of children on job participation. We estimated the time cost to mothers of rearing a child aged 0-3 years as 16.9 USD per hour, and the cost for a child aged 4-5 years as 15.0 USD per hour. Based on this estimation, the predicted uptake rate of women who did not have a child was 61.7%, while the predicted uptake rates for women with a child aged 0-3 and 4-5 were 54.2% and 58.6%, respectively. These results suggest that, although Japanese central/local governments provide free health checkup services, this policy does not fully compensate for the time cost of child rearing. It is strongly recommended that policies should be developed to address the time cost of child rearing, with the aim of closing the gender gap and securing universal access to preventive healthcare services in Japan. Copyright © 2018. Published by Elsevier Ltd.

  13. Space Station Freedom operations costs

    NASA Technical Reports Server (NTRS)

    Accola, Anne L.; Williams, Gregory J.

    1988-01-01

    Measures to reduce the operation costs of the Space Station which can be implemented in the design and development stages are discussed. Operational functions are described in the context of an overall operations concept. The provisions for operations cost responsibilities among the partners in the Space Station program are presented. Cost estimating methodologies and the way in which operations costs affect the design and development process are examined.

  14. BMP COST ANALYSIS FOR SOURCE WATER PROTECTION

    EPA Science Inventory

    Cost equations are developed to estimate capital, and operations and maintenance (O&M) costs for commonly used best management practices (BMPs). Total BMP volume and/or surface area is used to predict these costs. Engineering News Record (ENR) construction cost index was used t...

  15. Estimating the Cost of Cancer Care in British Columbia and Ontario: A Canadian Inter-Provincial Comparison

    PubMed Central

    Pataky, Reka; Bremner, Karen E.; Rangrej, Jagadish; Chan, Kelvin K.W.; Cheung, Winson Y.; Hoch, Jeffrey S.; Peacock, Stuart; Krahn, Murray D.

    2017-01-01

    Background: Costing studies are useful to measure the economic burden of cancer. Comparing costs between healthcare systems can inform evaluation, development or modification of cancer care policies. Objectives: To estimate and compare cancer costs in British Columbia and Ontario from the payers' perspectives. Methods: Using linked cancer registry and administrative data, and standardized costing methodology and analyses, we estimated costs for 21 cancer sites by phase of care to determine potential differences between provinces. Results: Overall, costs were higher in Ontario. Costs were highest in the initial post-diagnosis and pre-death phases and lowest in the pre-diagnosis and continuing phases, and generally higher for brain cancer and multiple myeloma, and lower for melanoma. Hospitalization was the major cost category. Costs for physician services and diagnostic tests differed the most between provinces. Conclusions: The standardization of data and costing methodology is challenging, but it enables interprovincial and international comparative costing analyses. PMID:28277207

  16. Using computerised patient-level costing data for setting DRG weights: the Victorian (Australia) cost weight studies.

    PubMed

    Jackson, T

    2001-05-01

    Casemix-funding systems for hospital inpatient care require a set of resource weights which will not inadvertently distort patterns of patient care. Few health systems have very good sources of cost information, and specific studies to derive empirical cost relativities are themselves costly. This paper reports a 5 year program of research into the use of data from hospital management information systems (clinical costing systems) to estimate resource relativities for inpatient hospital care used in Victoria's DRG-based payment system. The paper briefly describes international approaches to cost weight estimation. It describes the architecture of clinical costing systems, and contrasts process and job costing approaches to cost estimation. Techniques of data validation and reliability testing developed in the conduct of four of the first five of the Victorian Cost Weight Studies (1993-1998) are described. Improvement in sampling, data validity and reliability are documented over the course of the research program, the advantages of patient-level data are highlighted. The usefulness of these byproduct data for estimation of relative resource weights and other policy applications may be an important factor in hospital and health system decisions to invest in clinical costing technology.

  17. The direct cost of epilepsy in the United States: A systematic review of estimates.

    PubMed

    Begley, Charles E; Durgin, Tracy L

    2015-09-01

    To develop estimates of the direct cost of epilepsy in the United States for the general epilepsy population and sub-populations by systematically comparing similarities and differences in types of estimates and estimation methods from recently published studies. Papers published since 1995 were identified by systematic literature search. Information on types of estimates, study designs, data sources, types of epilepsy, and estimation methods was extracted from each study. Annual per person cost estimates from methodologically similar studies were identified, converted to 2013 U.S. dollars, and compared. From 4,104 publications discovered in the literature search, 21 were selected for review. Three were added that were published after the search. Eighteen were identified that reported estimates of average annual direct costs for the general epilepsy population in the United States. For general epilepsy populations (comprising all clinically defined subgroups), total direct healthcare costs per person ranged from $10,192 to $47,862 and epilepsy-specific costs ranged from $1,022 to $19,749. Four recent studies using claims data from large general populations yielded relatively similar epilepsy-specific annual cost estimates ranging from $8,412 to $11,354. Although more difficult to compare, studies examining direct cost differences for epilepsy sub-populations indicated a consistent pattern of markedly higher costs for those with uncontrolled or refractory epilepsy, and for those with comorbidities. This systematic review found that various approaches have been used to estimate the direct costs of epilepsy in the United States. However, recent studies using large claims databases and similar methods allow estimation of the direct cost burden of epilepsy for the general disease population, and show that it is greater for some patient subgroups. Additional research is needed to further understand the broader economic burden of epilepsy and how it varies across subpopulations. Wiley Periodicals, Inc. © 2015 International League Against Epilepsy.

  18. Phase III : GIS for the Appalachian Development Highway System 2007 cost to complete estimate

    DOT National Transportation Integrated Search

    2008-02-01

    The proposed research will create an ADHS GIS for integrating and disseminating GIS and transportation data that will increase the accuracy and efficiency associated with completing the 2007 ADHS Cost to Complete Estimate. This project will create ap...

  19. Ship Operating and Support Cost Estimating Guide.

    DTIC Science & Technology

    1982-07-13

    and Support, Cost Estimating Guide." Please substitute it for the document now on file at DTIC with the AD number of A 132442. Geraldine W. Asher I...replaces the CAIG memorandum on Operating and Sup- port Cos y Structures dated August 1977. 1.2 AUTHORITY. The foundation for development and review of...during the acquisition process, including cost effec- tiveness trade-off studies . The guide is generally expressed at the ship level of cost but is

  20. Estimating the Imputed Social Cost of Errors of Measurement.

    DTIC Science & Technology

    1983-10-01

    social cost of an error of measurement in the score on a unidimensional test, an asymptotic method, based on item response theory, is developed for...11111111 ij MICROCOPY RESOLUTION TEST CHART NATIONAL BUREAU OF STANDARDS-1963-A.5. ,,, I v.P I RR-83-33-ONR 4ESTIMATING THE IMPUTED SOCIAL COST S OF... SOCIAL COST OF ERRORS OF MEASUREMENT Frederic M. Lord This research was sponsored in part by the Personnel and Training Research Programs Psychological

  1. Launcher Systems Development Cost: Behavior, Uncertainty, Influences, Barriers and Strategies for Reduction

    NASA Technical Reports Server (NTRS)

    Shaw, Eric J.

    2001-01-01

    This paper will report on the activities of the IAA Launcher Systems Economics Working Group in preparations for its Launcher Systems Development Cost Behavior Study. The Study goals include: improve launcher system and other space system parametric cost analysis accuracy; improve launcher system and other space system cost analysis credibility; and provide launcher system and technology development program managers and other decisionmakers with useful information on development cost impacts of their decisions. The Working Group plans to explore at least the following five areas in the Study: define and explain development cost behavior terms and concepts for use in the Study; identify and quantify sources of development cost and cost estimating uncertainty; identify and quantify significant influences on development cost behavior; identify common barriers to development cost understanding and reduction; and recommend practical, realistic strategies to accomplish reductions in launcher system development cost.

  2. Methodology for conceptual remote sensing spacecraft technology: insertion analysis balancing performance, cost, and risk

    NASA Astrophysics Data System (ADS)

    Bearden, David A.; Duclos, Donald P.; Barrera, Mark J.; Mosher, Todd J.; Lao, Norman Y.

    1997-12-01

    Emerging technologies and micro-instrumentation are changing the way remote sensing spacecraft missions are developed and implemented. Government agencies responsible for procuring space systems are increasingly requesting analyses to estimate cost, performance and design impacts of advanced technology insertion for both state-of-the-art systems as well as systems to be built 5 to 10 years in the future. Numerous spacecraft technology development programs are being sponsored by Department of Defense (DoD) and National Aeronautics and Space Administration (NASA) agencies with the goal of enhancing spacecraft performance, reducing mass, and reducing cost. However, it is often the case that technology studies, in the interest of maximizing subsystem-level performance and/or mass reduction, do not anticipate synergistic system-level effects. Furthermore, even though technical risks are often identified as one of the largest cost drivers for space systems, many cost/design processes and models ignore effects of cost risk in the interest of quick estimates. To address these issues, the Aerospace Corporation developed a concept analysis methodology and associated software tools. These tools, collectively referred to as the concept analysis and design evaluation toolkit (CADET), facilitate system architecture studies and space system conceptual designs focusing on design heritage, technology selection, and associated effects on cost, risk and performance at the system and subsystem level. CADET allows: (1) quick response to technical design and cost questions; (2) assessment of the cost and performance impacts of existing and new designs/technologies; and (3) estimation of cost uncertainties and risks. These capabilities aid mission designers in determining the configuration of remote sensing missions that meet essential requirements in a cost- effective manner. This paper discuses the development of CADET modules and their application to several remote sensing satellite mission concepts.

  3. Helping the Noncompliant Child: An Assessment of Program Costs and Cost-Effectiveness.

    PubMed

    Honeycutt, Amanda A; Khavjou, Olga A; Jones, Deborah J; Cuellar, Jessica; Forehand, Rex L

    2015-02-01

    Disruptive behavior disorders (DBD) in children can lead to delinquency in adolescence and antisocial behavior in adulthood. Several evidence-based behavioral parent training (BPT) programs have been created to treat early onset DBD. This paper focuses on one such program, Helping the Noncompliant Child (HNC), and provides detailed cost estimates from a recently completed pilot study for the HNC program. The study also assesses the average cost-effectiveness of the HNC program by combining program cost estimates with data on improvements in child participants' disruptive behavior. The cost and effectiveness estimates are based on implementation of HNC with low-income families. Investigators developed a Microsoft Excel-based costing instrument to collect data from therapists on their time spent delivering the HNC program. The instrument was designed using an activity-based costing approach, where each therapist reported program time by family, by date, and for each skill that the family was working to master. Combining labor and non-labor costs, it is estimated that delivering the HNC program costs an average of $501 per family from a payer perspective. It also costs an average of $13 to improve the Eyberg Child Behavior Inventory intensity score by 1 point for children whose families participated in the HNC pilot program. The cost of delivering the HNC program appears to compare favorably with the costs of similar BPT programs. These cost estimates are the first to be collected systematically and prospectively for HNC. Program managers may use these estimates to plan for the resources needed to fully implement HNC.

  4. Estimating the costs of intensity-modulated and 3-dimensional conformal radiotherapy in Ontario.

    PubMed

    Yong, J H E; McGowan, T; Redmond-Misner, R; Beca, J; Warde, P; Gutierrez, E; Hoch, J S

    2016-06-01

    Radiotherapy is a common treatment for many cancers, but up-to-date estimates of the costs of radiotherapy are lacking. In the present study, we estimated the unit costs of intensity-modulated radiotherapy (imrt) and 3-dimensional conformal radiotherapy (3D-crt) in Ontario. An activity-based costing model was developed to estimate the costs of imrt and 3D-crt in prostate cancer. It included the costs of equipment, staff, and supporting infrastructure. The framework was subsequently adapted to estimate the costs of radiotherapy in breast cancer and head-and-neck cancer. We also tested various scenarios by varying the program maturity and the use of volumetric modulated arc therapy (vmat) alongside imrt. From the perspective of the health care system, treating prostate cancer with imrt and 3D-crt respectively cost $12,834 and $12,453 per patient. The cost of radiotherapy ranged from $5,270 to $14,155 and was sensitive to analytic perspective, radiation technique, and disease site. Cases of head-and-neck cancer were the most costly, being driven by treatment complexity and fractions per treatment. Although imrt was more costly than 3D-crt, its cost will likely decline over time as programs mature and vmat is incorporated. Our costing model can be modified to estimate the costs of 3D-crt and imrt for various disease sites and settings. The results demonstrate the important role of capital costs in studies of radiotherapy cost from a health system perspective, which our model can accommodate. In addition, our study established the need for future analyses of imrt cost to consider how vmat affects time consumption.

  5. Costing for the Future: Exploring Cost Estimation With Unmanned Autonomous Systems

    DTIC Science & Technology

    2016-04-30

    account for how cost estimating for autonomy is different than current methodologies and to suggest ways it can be addressed through the integration and...The Development stage involves refining the system requirements, creating a solution description , and building a system. 3. The Operational Test...parameter describes the extent to which efficient fabrication methodologies and processes are used, and the automation of labor-intensive operations

  6. Evaluation of Methodology for Estimating the Cost of Air Force On-The-Job Training. Final Report.

    ERIC Educational Resources Information Center

    Samers, Bernard N.; And Others

    Described is the final phase of a study directed at the development of an on-the-job training (OJT) costing methodology. Utilizing a modification of survey techniques tested and evaluated during the previous phase, estimates were obtained for the cost of OJT for airman training from the l-level (unskilled to the 3-level (semiskilled) in five…

  7. Magnetohydrodynamics MHD Engineering Test Facility ETF 200 MWe power plant. Conceptual Design Engineering Report CDER. Volume 3: Costs and schedules

    NASA Astrophysics Data System (ADS)

    1981-09-01

    The estimated plant capital cost for a coal fired 200 MWE electric generating plant with open cycle magnetohydrodynamics is divided into principal accounts based on Federal Energy Regulatory Commision account structure. Each principal account is defined and its estimated cost subdivided into identifiable and major equipment systems. The cost data sources for compiling the estimates, cost parameters, allotments, assumptions, and contingencies, are discussed. Uncertainties associated with developing the costs are quantified to show the confidence level acquired. Guidelines established in preparing the estimated costs are included. Based on an overall milestone schedule related to conventional power plant scheduling experience and starting procurement of MHD components during the preliminary design phase there is a 6 1/2-year construction period. The duration of the project from start to commercial operation is 79 months. The engineering phase of the project is 4 1/2 years; the construction duration following the start of the man power block is 37 months.

  8. Magnetohydrodynamics MHD Engineering Test Facility ETF 200 MWe power plant. Conceptual Design Engineering Report CDER. Volume 3: Costs and schedules

    NASA Technical Reports Server (NTRS)

    1981-01-01

    The estimated plant capital cost for a coal fired 200 MWE electric generating plant with open cycle magnetohydrodynamics is divided into principal accounts based on Federal Energy Regulatory Commision account structure. Each principal account is defined and its estimated cost subdivided into identifiable and major equipment systems. The cost data sources for compiling the estimates, cost parameters, allotments, assumptions, and contingencies, are discussed. Uncertainties associated with developing the costs are quantified to show the confidence level acquired. Guidelines established in preparing the estimated costs are included. Based on an overall milestone schedule related to conventional power plant scheduling experience and starting procurement of MHD components during the preliminary design phase there is a 6 1/2-year construction period. The duration of the project from start to commercial operation is 79 months. The engineering phase of the project is 4 1/2 years; the construction duration following the start of the man power block is 37 months.

  9. BMP COST ANALYSIS FOR SOURCE WATER PROTECTION

    EPA Science Inventory

    Cost equations are developed to estimate capital and operations and maintenance (O&M) for commonly used best management practices (BMPS). Total BMP volume and/or surface area is used to predict these costs. ENR construction cost index was used to adjust cost data to December 2000...

  10. A Framework for Automating Cost Estimates in Assembly Processes

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Calton, T.L.; Peters, R.R.

    1998-12-09

    When a product concept emerges, the manufacturing engineer is asked to sketch out a production strategy and estimate its cost. The engineer is given an initial product design, along with a schedule of expected production volumes. The engineer then determines the best approach to manufacturing the product, comparing a variey of alternative production strategies. The engineer must consider capital cost, operating cost, lead-time, and other issues in an attempt to maximize pro$ts. After making these basic choices and sketching the design of overall production, the engineer produces estimates of the required capital, operating costs, and production capacity. 177is process maymore » iterate as the product design is refined in order to improve its pe~ormance or manufacturability. The focus of this paper is on the development of computer tools to aid manufacturing engineers in their decision-making processes. This computer sof~are tool provides aj?amework in which accurate cost estimates can be seamlessly derivedfiom design requirements at the start of any engineering project. Z+e result is faster cycle times through first-pass success; lower ll~e cycie cost due to requirements-driven design and accurate cost estimates derived early in the process.« less

  11. 48 CFR 736.605 - Government cost estimate for architect-engineer work.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... for architect-engineer work. 736.605 Section 736.605 Federal Acquisition Regulations System AGENCY FOR INTERNATIONAL DEVELOPMENT SPECIAL CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Architect-Engineer Services 736.605 Government cost estimate for architect-engineer work. See 736.602-3(c)(5). ...

  12. 48 CFR 736.605 - Government cost estimate for architect-engineer work.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... for architect-engineer work. 736.605 Section 736.605 Federal Acquisition Regulations System AGENCY FOR INTERNATIONAL DEVELOPMENT SPECIAL CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Architect-Engineer Services 736.605 Government cost estimate for architect-engineer work. See 736.602-3(c)(5). ...

  13. 48 CFR 736.605 - Government cost estimate for architect-engineer work.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... for architect-engineer work. 736.605 Section 736.605 Federal Acquisition Regulations System AGENCY FOR INTERNATIONAL DEVELOPMENT SPECIAL CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Architect-Engineer Services 736.605 Government cost estimate for architect-engineer work. See 736.602-3(c)(5). ...

  14. 48 CFR 736.605 - Government cost estimate for architect-engineer work.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... for architect-engineer work. 736.605 Section 736.605 Federal Acquisition Regulations System AGENCY FOR INTERNATIONAL DEVELOPMENT SPECIAL CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Architect-Engineer Services 736.605 Government cost estimate for architect-engineer work. See 736.602-3(c)(5). ...

  15. 48 CFR 736.605 - Government cost estimate for architect-engineer work.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... for architect-engineer work. 736.605 Section 736.605 Federal Acquisition Regulations System AGENCY FOR INTERNATIONAL DEVELOPMENT SPECIAL CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Architect-Engineer Services 736.605 Government cost estimate for architect-engineer work. See 736.602-3(c)(5). ...

  16. A non-stationary cost-benefit based bivariate extreme flood estimation approach

    NASA Astrophysics Data System (ADS)

    Qi, Wei; Liu, Junguo

    2018-02-01

    Cost-benefit analysis and flood frequency analysis have been integrated into a comprehensive framework to estimate cost effective design values. However, previous cost-benefit based extreme flood estimation is based on stationary assumptions and analyze dependent flood variables separately. A Non-Stationary Cost-Benefit based bivariate design flood estimation (NSCOBE) approach is developed in this study to investigate influence of non-stationarities in both the dependence of flood variables and the marginal distributions on extreme flood estimation. The dependence is modeled utilizing copula functions. Previous design flood selection criteria are not suitable for NSCOBE since they ignore time changing dependence of flood variables. Therefore, a risk calculation approach is proposed based on non-stationarities in both marginal probability distributions and copula functions. A case study with 54-year observed data is utilized to illustrate the application of NSCOBE. Results show NSCOBE can effectively integrate non-stationarities in both copula functions and marginal distributions into cost-benefit based design flood estimation. It is also found that there is a trade-off between maximum probability of exceedance calculated from copula functions and marginal distributions. This study for the first time provides a new approach towards a better understanding of influence of non-stationarities in both copula functions and marginal distributions on extreme flood estimation, and could be beneficial to cost-benefit based non-stationary bivariate design flood estimation across the world.

  17. Expert assessments of the cost of light water small modular reactors

    PubMed Central

    Abdulla, Ahmed; Azevedo, Inês Lima; Morgan, M. Granger

    2013-01-01

    Analysts and decision makers frequently want estimates of the cost of technologies that have yet to be developed or deployed. Small modular reactors (SMRs), which could become part of a portfolio of carbon-free energy sources, are one such technology. Existing estimates of likely SMR costs rely on problematic top-down approaches or bottom-up assessments that are proprietary. When done properly, expert elicitations can complement these approaches. We developed detailed technical descriptions of two SMR designs and then conduced elicitation interviews in which we obtained probabilistic judgments from 16 experts who are involved in, or have access to, engineering-economic assessments of SMR projects. Here, we report estimates of the overnight cost and construction duration for five reactor-deployment scenarios that involve a large reactor and two light water SMRs. Consistent with the uncertainty introduced by past cost overruns and construction delays, median estimates of the cost of new large plants vary by more than a factor of 2.5. Expert judgments about likely SMR costs display an even wider range. Median estimates for a 45 megawatts-electric (MWe) SMR range from $4,000 to $16,300/kWe and from $3,200 to $7,100/kWe for a 225-MWe SMR. Sources of disagreement are highlighted, exposing the thought processes of experts involved with SMR design. There was consensus that SMRs could be built and brought online about 2 y faster than large reactors. Experts identify more affordable unit cost, factory fabrication, and shorter construction schedules as factors that may make light water SMRs economically viable. PMID:23716682

  18. Expert assessments of the cost of light water small modular reactors.

    PubMed

    Abdulla, Ahmed; Azevedo, Inês Lima; Morgan, M Granger

    2013-06-11

    Analysts and decision makers frequently want estimates of the cost of technologies that have yet to be developed or deployed. Small modular reactors (SMRs), which could become part of a portfolio of carbon-free energy sources, are one such technology. Existing estimates of likely SMR costs rely on problematic top-down approaches or bottom-up assessments that are proprietary. When done properly, expert elicitations can complement these approaches. We developed detailed technical descriptions of two SMR designs and then conduced elicitation interviews in which we obtained probabilistic judgments from 16 experts who are involved in, or have access to, engineering-economic assessments of SMR projects. Here, we report estimates of the overnight cost and construction duration for five reactor-deployment scenarios that involve a large reactor and two light water SMRs. Consistent with the uncertainty introduced by past cost overruns and construction delays, median estimates of the cost of new large plants vary by more than a factor of 2.5. Expert judgments about likely SMR costs display an even wider range. Median estimates for a 45 megawatts-electric (MWe) SMR range from $4,000 to $16,300/kWe and from $3,200 to $7,100/kWe for a 225-MWe SMR. Sources of disagreement are highlighted, exposing the thought processes of experts involved with SMR design. There was consensus that SMRs could be built and brought online about 2 y faster than large reactors. Experts identify more affordable unit cost, factory fabrication, and shorter construction schedules as factors that may make light water SMRs economically viable.

  19. Review of hardware cost estimation methods, models and tools applied to early phases of space mission planning

    NASA Astrophysics Data System (ADS)

    Trivailo, O.; Sippel, M.; Şekercioğlu, Y. A.

    2012-08-01

    The primary purpose of this paper is to review currently existing cost estimation methods, models, tools and resources applicable to the space sector. While key space sector methods are outlined, a specific focus is placed on hardware cost estimation on a system level, particularly for early mission phases during which specifications and requirements are not yet crystallised, and information is limited. For the space industry, cost engineering within the systems engineering framework is an integral discipline. The cost of any space program now constitutes a stringent design criterion, which must be considered and carefully controlled during the entire program life cycle. A first step to any program budget is a representative cost estimate which usually hinges on a particular estimation approach, or methodology. Therefore appropriate selection of specific cost models, methods and tools is paramount, a difficult task given the highly variable nature, scope as well as scientific and technical requirements applicable to each program. Numerous methods, models and tools exist. However new ways are needed to address very early, pre-Phase 0 cost estimation during the initial program research and establishment phase when system specifications are limited, but the available research budget needs to be established and defined. Due to their specificity, for vehicles such as reusable launchers with a manned capability, a lack of historical data implies that using either the classic heuristic approach such as parametric cost estimation based on underlying CERs, or the analogy approach, is therefore, by definition, limited. This review identifies prominent cost estimation models applied to the space sector, and their underlying cost driving parameters and factors. Strengths, weaknesses, and suitability to specific mission types and classes are also highlighted. Current approaches which strategically amalgamate various cost estimation strategies both for formulation and validation of an estimate, and techniques and/or methods to attain representative and justifiable cost estimates are consequently discussed. Ultimately, the aim of the paper is to establish a baseline for development of a non-commercial, low cost, transparent cost estimation methodology to be applied during very early program research phases at a complete vehicle system level, for largely unprecedented manned launch vehicles in the future. This paper takes the first step to achieving this through the identification, analysis and understanding of established, existing techniques, models, tools and resources relevant within the space sector.

  20. The cost of a case of subclinical ketosis in Canadian dairy herds

    PubMed Central

    Gohary, Khaled; Overton, Michael W.; Von Massow, Michael; LeBlanc, Stephen J.; Lissemore, Kerry D.; Duffield, Todd F.

    2016-01-01

    The objective of this study was to develop a model to estimate the cost of a case of subclinical ketosis (SCK) in Canadian dairy herds. Costs were derived from the default inputs, and included increased clinical disease incidence attributable to SCK, $76; longer time to pregnancy, $57; culling and death in early lactation attributable to SCK, $26; milk production loss, $44. Given these figures, the cost of 1 case of SCK was estimated to be $203. Sensitivity analysis showed that the estimated cost of a case of SCK was most sensitive to the herd-level incidence of SCK and the cost of 1 day open. In conclusion, SCK negatively impacts dairy herds and losses are dependent on the herd-level incidence and factors included in the calculation. PMID:27429460

  1. The cost of a case of subclinical ketosis in Canadian dairy herds.

    PubMed

    Gohary, Khaled; Overton, Michael W; Von Massow, Michael; LeBlanc, Stephen J; Lissemore, Kerry D; Duffield, Todd F

    2016-07-01

    The objective of this study was to develop a model to estimate the cost of a case of subclinical ketosis (SCK) in Canadian dairy herds. Costs were derived from the default inputs, and included increased clinical disease incidence attributable to SCK, $76; longer time to pregnancy, $57; culling and death in early lactation attributable to SCK, $26; milk production loss, $44. Given these figures, the cost of 1 case of SCK was estimated to be $203. Sensitivity analysis showed that the estimated cost of a case of SCK was most sensitive to the herd-level incidence of SCK and the cost of 1 day open. In conclusion, SCK negatively impacts dairy herds and losses are dependent on the herd-level incidence and factors included in the calculation.

  2. Predicting Production Costs for Advanced Aerospace Vehicles

    NASA Technical Reports Server (NTRS)

    Bao, Han P.; Samareh, J. A.; Weston, R. P.

    2002-01-01

    For early design concepts, the conventional approach to cost is normally some kind of parametric weight-based cost model. There is now ample evidence that this approach can be misleading and inaccurate. By the nature of its development, a parametric cost model requires historical data and is valid only if the new design is analogous to those for which the model was derived. Advanced aerospace vehicles have no historical production data and are nowhere near the vehicles of the past. Using an existing weight-based cost model would only lead to errors and distortions of the true production cost. This paper outlines the development of a process-based cost model in which the physical elements of the vehicle are soared according to a first-order dynamics model. This theoretical cost model, first advocated by early work at MIT, has been expanded to cover the basic structures of an advanced aerospace vehicle. Elemental costs based on the geometry of the design can be summed up to provide an overall estimation of the total production cost for a design configuration. This capability to directly link any design configuration to realistic cost estimation is a key requirement for high payoff MDO problems. Another important consideration in this paper is the handling of part or product complexity. Here the concept of cost modulus is introduced to take into account variability due to different materials, sizes, shapes, precision of fabrication, and equipment requirements. The most important implication of the development of the proposed process-based cost model is that different design configurations can now be quickly related to their cost estimates in a seamless calculation process easily implemented on any spreadsheet tool.

  3. A measurement system for large, complex software programs

    NASA Technical Reports Server (NTRS)

    Rone, Kyle Y.; Olson, Kitty M.; Davis, Nathan E.

    1994-01-01

    This paper describes measurement systems required to forecast, measure, and control activities for large, complex software development and support programs. Initial software cost and quality analysis provides the foundation for meaningful management decisions as a project evolves. In modeling the cost and quality of software systems, the relationship between the functionality, quality, cost, and schedule of the product must be considered. This explicit relationship is dictated by the criticality of the software being developed. This balance between cost and quality is a viable software engineering trade-off throughout the life cycle. Therefore, the ability to accurately estimate the cost and quality of software systems is essential to providing reliable software on time and within budget. Software cost models relate the product error rate to the percent of the project labor that is required for independent verification and validation. The criticality of the software determines which cost model is used to estimate the labor required to develop the software. Software quality models yield an expected error discovery rate based on the software size, criticality, software development environment, and the level of competence of the project and developers with respect to the processes being employed.

  4. Research and Development Spending to Bring a Single Cancer Drug to Market and Revenues After Approval.

    PubMed

    Prasad, Vinay; Mailankody, Sham

    2017-11-01

    A common justification for high cancer drug prices is the sizable research and development (R&D) outlay necessary to bring a drug to the US market. A recent estimate of R&D spending is $2.7 billion (2017 US dollars). However, this analysis lacks transparency and independent replication. To provide a contemporary estimate of R&D spending to develop cancer drugs. Analysis of US Securities and Exchange Commission filings for drug companies with no drugs on the US market that received approval by the US Food and Drug Administration for a cancer drug from January 1, 2006, through December 31, 2015. Cumulative R&D spending was estimated from initiation of drug development activity to date of approval. Earnings were also identified from the time of approval to the present. The study was conducted from December 10, 2016, to March 2, 2017. Median R&D spending on cancer drug development. Ten companies and drugs were included in this analysis. The 10 companies had a median time to develop a drug of 7.3 years (range, 5.8-15.2 years). Five drugs (50%) received accelerated approval from the US Food and Drug Administration, and 5 (50%) received regular approval. The median cost of drug development was $648.0 million (range, $157.3 million to $1950.8 million). The median cost was $757.4 million (range, $203.6 million to $2601.7 million) for a 7% per annum cost of capital (or opportunity costs) and $793.6 million (range, $219.1 million to $2827.1 million) for a 9% opportunity costs. With a median of 4.0 years (range, 0.8-8.8 years) since approval, the total revenue from sales of these 10 drugs since approval was $67.0 billion compared with total R&D spending of $7.2 billion ($9.1 billion, including 7% opportunity costs). The cost to develop a cancer drug is $648.0 million, a figure significantly lower than prior estimates. The revenue since approval is substantial (median, $1658.4 million; range, $204.1 million to $22 275.0 million). This analysis provides a transparent estimate of R&D spending on cancer drugs and has implications for the current debate on drug pricing.

  5. The human and economic cost of hidden hunger.

    PubMed

    Stein, Alexander J; Qaim, Matin

    2007-06-01

    Micronutrient malnutrition is a public health problem in many developing countries. Its negative impact on income growth is recognized in principle, but there are widely varying estimates of the related economic cost. To discuss available studies that quantify the cost of micronutrient malnutrition, and to develop an alternative framework and apply it to India. Detailed burden of disease calculations are used to estimate the economic cost of micronutrient malnutrition based on disability-adjusted life years (DALYs) lost. The short-term economic cost of micronutrient malnutrition in India amounts to 0.8% to 2.5% of the gross domestic product. Although the results confirm that micronutrient malnutrition is a huge economic problem, the estimates are lower than those of most previous studies. The differences may be due to differences in underlying assumptions, quality of data, and precision of calculation, but also to dynamic interactions between nutrition, health, and economic productivity, which are difficult to capture. Clear explanation of all calculation details would be desirable for future studies in order to increase credibility and transparency.

  6. Good Manufacturing Practices (GMP) manufacturing of advanced therapy medicinal products: a novel tailored model for optimizing performance and estimating costs.

    PubMed

    Abou-El-Enein, Mohamed; Römhild, Andy; Kaiser, Daniel; Beier, Carola; Bauer, Gerhard; Volk, Hans-Dieter; Reinke, Petra

    2013-03-01

    Advanced therapy medicinal products (ATMP) have gained considerable attention in academia due to their therapeutic potential. Good Manufacturing Practice (GMP) principles ensure the quality and sterility of manufacturing these products. We developed a model for estimating the manufacturing costs of cell therapy products and optimizing the performance of academic GMP-facilities. The "Clean-Room Technology Assessment Technique" (CTAT) was tested prospectively in the GMP facility of BCRT, Berlin, Germany, then retrospectively in the GMP facility of the University of California-Davis, California, USA. CTAT is a two-level model: level one identifies operational (core) processes and measures their fixed costs; level two identifies production (supporting) processes and measures their variable costs. The model comprises several tools to measure and optimize performance of these processes. Manufacturing costs were itemized using adjusted micro-costing system. CTAT identified GMP activities with strong correlation to the manufacturing process of cell-based products. Building best practice standards allowed for performance improvement and elimination of human errors. The model also demonstrated the unidirectional dependencies that may exist among the core GMP activities. When compared to traditional business models, the CTAT assessment resulted in a more accurate allocation of annual expenses. The estimated expenses were used to set a fee structure for both GMP facilities. A mathematical equation was also developed to provide the final product cost. CTAT can be a useful tool in estimating accurate costs for the ATMPs manufactured in an optimized GMP process. These estimates are useful when analyzing the cost-effectiveness of these novel interventions. Copyright © 2013 International Society for Cellular Therapy. Published by Elsevier Inc. All rights reserved.

  7. Cost-Effectiveness of Routine Screening for Critical Congenital Heart Disease in US Newborns

    PubMed Central

    Peterson, Cora; Grosse, Scott D.; Oster, Matthew E.; Olney, Richard S.; Cassell, Cynthia H.

    2015-01-01

    OBJECTIVES Clinical evidence indicates newborn critical congenital heart disease (CCHD) screening through pulse oximetry is lifesaving. In 2011, CCHD was added to the US Recommended Uniform Screening Panel for newborns. Several states have implemented or are considering screening mandates. This study aimed to estimate the cost-effectiveness of routine screening among US newborns unsuspected of having CCHD. METHODS We developed a cohort model with a time horizon of infancy to estimate the inpatient medical costs and health benefits of CCHD screening. Model inputs were derived from new estimates of hospital screening costs and inpatient care for infants with late-detected CCHD, defined as no diagnosis at the birth hospital. We estimated the number of newborns with CCHD detected at birth hospitals and life-years saved with routine screening compared with no screening. RESULTS Screening was estimated to incur an additional cost of $6.28 per newborn, with incremental costs of $20 862 per newborn with CCHD detected at birth hospitals and $40 385 per life-year gained (2011 US dollars). We estimated 1189 more newborns with CCHD would be identified at birth hospitals and 20 infant deaths averted annually with screening. Another 1975 false-positive results not associated with CCHD were estimated to occur, although these results had a minimal impact on total estimated costs. CONCLUSIONS This study provides the first US cost-effectiveness analysis of CCHD screening in the United States could be reasonably cost-effective. We anticipate data from states that have recently approved or initiated CCHD screening will become available over the next few years to refine these projections. PMID:23918890

  8. A Descriptive Evaluation of Automated Software Cost-Estimation Models,

    DTIC Science & Technology

    1986-10-01

    Version 1.03D) * PCOC (Version 7.01) - PRICE S • SLIM (Version 1.1) • SoftCost (Version 5. 1) * SPQR /20 (Version 1. 1) - WICOMO (Version 1.3) These...produce detailed GANTT and PERT charts. SPQR /20 is based on a cost model developed at ITT. In addition to cost, schedule, and staffing estimates, it...cases and test runs required, and the effectiveness of pre-test and test activities. SPQR /20 also predicts enhancement and maintenance activities. C

  9. Cost estimation model for advanced planetary programs, fourth edition

    NASA Technical Reports Server (NTRS)

    Spadoni, D. J.

    1983-01-01

    The development of the planetary program cost model is discussed. The Model was updated to incorporate cost data from the most recent US planetary flight projects and extensively revised to more accurately capture the information in the historical cost data base. This data base is comprised of the historical cost data for 13 unmanned lunar and planetary flight programs. The revision was made with a two fold objective: to increase the flexibility of the model in its ability to deal with the broad scope of scenarios under consideration for future missions, and to maintain and possibly improve upon the confidence in the model's capabilities with an expected accuracy of 20%. The Model development included a labor/cost proxy analysis, selection of the functional forms of the estimating relationships, and test statistics. An analysis of the Model is discussed and two sample applications of the cost model are presented.

  10. Detailed costing document for the centralized waste treatment industry

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1998-12-01

    In this document, EPA presents the costs estimated for compliance with the proposed CWT effluent limitations guidelines and standards. Section 1 provides a general description of how the individual treatment technology and regulatory option costs were developed. In Sections 2 through 4, EPA describes the development of costs for each of the wastewater and sludge treatment technologies. In Section 5, EPA presents additional compliance costs to be incurred by facilities, which are not technology specific. These additional items are retrofit costs, monitoring costs, RCRA permit modification costs, and land costs.

  11. Reliability and Validity in Hospital Case-Mix Measurement

    PubMed Central

    Pettengill, Julian; Vertrees, James

    1982-01-01

    There is widespread interest in the development of a measure of hospital output. This paper describes the problem of measuring the expected cost of the mix of inpatient cases treated in a hospital (hospital case-mix) and a general approach to its solution. The solution is based on a set of homogenous groups of patients, defined by a patient classification system, and a set of estimated relative cost weights corresponding to the patient categories. This approach is applied to develop a summary measure of the expected relative costliness of the mix of Medicare patients treated in 5,576 participating hospitals. The Medicare case-mix index is evaluated by estimating a hospital average cost function. This provides a direct test of the hypothesis that the relationship between Medicare case-mix and Medicare cost per case is proportional. The cost function analysis also provides a means of simulating the effects of classification error on our estimate of this relationship. Our results indicate that this general approach to measuring hospital case-mix provides a valid and robust measure of the expected cost of a hospital's case-mix. PMID:10309909

  12. 75 FR 49025 - Proposed Collection; Comment Request for Form W-11

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-12

    ... form was developed as a template for the convenience of employers who must collect affidavits from... collection. Affected Public: Businesses or other for-profit institutions. Estimated Number of Respondents...) estimates of capital or start-up costs and costs of operation, maintenance, and purchase of services to...

  13. Plantation thinning systems in the Southern United States

    Treesearch

    Bryce J. Stokes; William F. Watson

    1996-01-01

    This paper reviews southern pine management and thinning practices, describes three harvesting systems for thinning, and presents production and cost estimates, and utilization rates. The costs and product recoveries were developed from published sources using a spreadsheet analysis. Systems included tree-length, flail/chip, and cut-to-length. The estimated total...

  14. The Program Cost of a Brief Video Intervention Shown in Sexually Transmitted Disease Clinic Waiting Rooms.

    PubMed

    Gift, Thomas L; OʼDonnell, Lydia N; Rietmeijer, Cornelis A; Malotte, Kevin C; Klausner, Jeffrey D; Margolis, Andrew D; Borkowf, Craig B; Kent, Charlotte K; Warner, Lee

    2016-01-01

    Patients in sexually transmitted disease (STD) clinic waiting rooms represent a potential audience for delivering health messages via video-based interventions. A controlled trial at 3 sites found that patients exposed to one intervention, Safe in the City, had a significantly lower incidence of STDs compared with patients in the control condition. An evaluation of the intervention's cost could help determine whether such interventions are programmatically viable. The cost of producing the Safe in the City intervention was estimated using study records, including logs, calendars, and contract invoices. Production costs were divided by the 1650 digital video kits initially fabricated to get an estimated cost per digital video. Clinic costs for showing the video in waiting rooms included staff time costs for equipment operation and hardware depreciation and were estimated for the 21-month study observation period retrospectively. The intervention cost an estimated $416,966 to develop, equaling $253 per digital video disk produced. Per-site costs to show the video intervention were estimated to be $2699 during the randomized trial. The cost of producing and implementing Safe in the City intervention suggests that similar interventions could potentially be produced and made available to end users at a price that would both cover production costs and be low enough that the end users could afford them.

  15. The cost of an Ebola case.

    PubMed

    Bartsch, Sarah M; Gorham, Katrin; Lee, Bruce Y

    2015-02-01

    As the most recent outbreak of Ebola virus disease (EVD) in West Africa continues to grow since its initial recognition as a Public Health Emergency of International Concern, an unanswered question is what is the cost of a case of Ebola? Understanding this cost will help decision makers better understand the impact of each case of EVD, benchmark this against that of other diseases, prioritize which cases may require response, and begin to estimate the cost of Ebola outbreaks. To date, the scientific literature has not characterized this cost per case. Therefore, we developed a mathematical model to estimate the cost of an EVD case from the provider and societal perspectives in the three most affected countries of Guinea, Liberia, and Sierra Leone. Our model estimates the total societal cost of an EVD case with full recovery ranges from $480 to $912, while that of an EVD case not surviving ranges from $5929 to $18 929, varying by age and country. Therefore, as of 10 December 2014, the estimated total societal costs of all reported EVD cases in these three countries range from $82 to potentially over $356 million.

  16. An overall estimation of losses caused by diseases in the Brazilian fish farms.

    PubMed

    Tavares-Dias, Marcos; Martins, Maurício Laterça

    2017-12-01

    Parasitic and infectious diseases are common in finfish, but are difficult to accurately estimate the economic impacts on the production in a country with large dimensions like Brazil. The aim of this study was to estimate the costs caused by economic losses of finfish due to mortality by diseases in Brazil. A model for estimating the costs related to parasitic and bacterial diseases in farmed fish and an estimative of these economic impacts are presented. We used official data of production and mortality of finfish for rough estimation of economic losses. The losses herein presented are related to direct and indirect economic costs for freshwater farmed fish, which were estimated in US$ 84 million per year. Finally, it was possible to establish by the first time an estimative of overall losses in finfish production in Brazil using data available from production. Therefore, this current estimative must help researchers and policy makers to approximate the economic costs of diseases for fish farming industry, as well as for developing of public policies on the control measures of diseases and priority research lines.

  17. Direct and Indirect Costs of Asthma Management in Greece: An Expert Panel Approach.

    PubMed

    Souliotis, Kyriakos; Kousoulakou, Hara; Hillas, Georgios; Bakakos, Petros; Toumbis, Michalis; Loukides, Stelios; Vassilakopoulos, Theodoros

    2017-01-01

    Asthma is a major cause of morbidity and mortality and is associated with significant economic burden worldwide. The objectives of this study were to map current resource use associated with the disease management and to estimate the annual direct and indirect costs per adult patient with asthma. A Delphi panel with seven leading pulmonologists was conducted. A semistructured questionnaire was developed to elicit data on resource use and treatment patterns. Unit costs from official, published sources were subsequently assigned to resource use to estimate direct medical costs. Indirect costs were estimated as number of work loss days. Cost base year was 2015, and the perspective adopted was that of the National Organization of Health Care Services Provision, as well as the societal. Patients with asthma are mainly managed by pulmonologists (71.4%) and secondarily by general practitioners and internists (28.6%). The annual cost of managing exacerbations was estimated at €273.1, while maintenance costs were estimated at €1,100.2 per year. Total costs of managing asthma per patient per year were estimated at €2,281.8, 64.4% of which represented direct medical costs. Of the direct costs, pharmaceutical treatment was the key driver, accounting for 63.9 and 41.2% of direct and total costs, respectively. Direct non-medical costs (patient travel and waiting time) were estimated at €152.3. Indirect costs accounted for 28.9% of total costs. Asthma is a chronic condition, the management of which constrains the already limited Greek health care resources. The increasing prevalence of the disease raises concerns as it could translate per patient costs into a significant burden for the Greek health care system. Thus, the prevention, self-management, and improved quality of care for asthma should find a place in the health policy agenda in Greece.

  18. Weapon System Costing Methodology for Aircraft Airframes and Basic Structures. Volume I. Technical Volume

    DTIC Science & Technology

    1975-06-01

    the Air Force Flight Dynamics Laboratory for use in conceptual and preliminary designs pauses of weapon system development. The methods are a...trade study method provides ai\\ iterative capability stemming from a direct interface with design synthesis programs. A detailed cost data base ;ind...system for data expmjsion is provided. The methods are designed for ease in changing cost estimating relationships and estimating coefficients

  19. Estimation of the cost of electro-mechanical equipment for small hydropower plants - review and comparison of methods

    NASA Astrophysics Data System (ADS)

    Lipiński, Seweryn; Olkowski, Tomasz

    2017-10-01

    The estimate of the cost of electro-mechanical equipment for new small hydropower plants most often amounts to about 30-40% of the total budget. In case of modernization of existing installations, this estimation represents the main cost. This matter constitutes a research problem for at least few decades. Many models have been developed for that purpose. The aim of our work was to collect and analyse formulas that allow estimation of the cost of investment in electro-mechanical equipment for small hydropower plants. Over a dozen functions were analysed. To achieve the aim of our work, these functions were converted into the form allowing their comparison. Then the costs were simulated with respect to plants' powers and net heads; such approach is novel and allows deeper discussion of the problem, as well as drawing broader conclusions. The following conclusions can be drawn: significant differences in results obtained by using various formulas were observed; there is a need for a wide study based on national investments in small hydropower plants that would allow to develop equations based on local data; the obtained formulas would let to determinate the costs of modernization or a new construction of small hydropower plant more precisely; special attention should be payed to formulas considering turbine type.

  20. Energy Cost Impact of Non-Residential Energy Code Requirements

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Zhang, Jian; Hart, Philip R.; Rosenberg, Michael I.

    2016-08-22

    The 2012 International Energy Conservation Code contains 396 separate requirements applicable to non-residential buildings; however, there is no systematic analysis of the energy cost impact of each requirement. Consequently, limited code department budgets for plan review, inspection, and training cannot be focused on the most impactful items. An inventory and ranking of code requirements based on their potential energy cost impact is under development. The initial phase focuses on office buildings with simple HVAC systems in climate zone 4C. Prototype building simulations were used to estimate the energy cost impact of varying levels of non-compliance. A preliminary estimate of themore » probability of occurrence of each level of non-compliance was combined with the estimated lost savings for each level to rank the requirements according to expected savings impact. The methodology to develop and refine further energy cost impacts, specific to building type, system type, and climate location is demonstrated. As results are developed, an innovative alternative method for compliance verification can focus efforts so only the most impactful requirements from an energy cost perspective are verified for every building and a subset of the less impactful requirements are verified on a random basis across a building population. The results can be further applied in prioritizing training material development and specific areas of building official training.« less

  1. Development costs of reusable launch vehicles

    NASA Astrophysics Data System (ADS)

    Koelle, D.

    2002-07-01

    The paper deals first with the definition and understanding of "Development Costs" in general. Usually there is large difference between initial "development cost guesses", "Proposal Cost Estimations" and the final "Cost-to-Completion". The reasons for the usual development cost increases during development are discussed. The second part discusses the range of historic launch systems' development costs under "Business-as-Usual" (BaU) - Conditions and potential cost reductions for future developments of RLVs, as well as the comparison to commercial, industrial development cost. Part three covers the potential reduction of development cost by application of "Cost Engineering Principles". An example of the large potential cost range (between 6 and 17 Billion USD) for the development of the same winged rocket-propelled SSTO launch vehicle concept is presented. Finally the tremendous development cost differences are shown which exist for the different potential Reusable Launch System Options which are under discussion. There remains an unresolved problem between the primary goals of the national space agencies with emphasis on new technology development/national prestige and the commercial market requirement of a simple low-cost RLV-System.

  2. A 30 MW, 200 MHz Inductive Output Tube for RF Accelerators

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    R. Lawrence Ives; Michael Read

    2008-06-19

    This program investigated development of a multiple beam inductive output tube (IOT) to produce 30 MW pulses at 200 MHz. The program was successful in demonstrating feasibility of developing the source to achieve the desired power in microsecond pulses with 70% efficiency. The predicted gain of the device is 24 dB. Consequently, a 200 kW driver would be required for the RF input. Estimated cost of this driver is approximately $1.25 M. Given the estimated development cost of the IOT of approximately $750K and the requirements for a test set that would significantly increase the cost, it was determined thatmore » development could not be achieved within the funding constraints of a Phase II program.« less

  3. Benefit-cost estimation for alternative drinking water maximum contaminant levels

    NASA Astrophysics Data System (ADS)

    Gurian, Patrick L.; Small, Mitchell J.; Lockwood, John R.; Schervish, Mark J.

    2001-08-01

    A simulation model for estimating compliance behavior and resulting costs at U.S. Community Water Suppliers is developed and applied to the evaluation of a more stringent maximum contaminant level (MCL) for arsenic. Probability distributions of source water arsenic concentrations are simulated using a statistical model conditioned on system location (state) and source water type (surface water or groundwater). This model is fit to two recent national surveys of source waters, then applied with the model explanatory variables for the population of U.S. Community Water Suppliers. Existing treatment types and arsenic removal efficiencies are also simulated. Utilities with finished water arsenic concentrations above the proposed MCL are assumed to select the least cost option compatible with their existing treatment from among 21 available compliance strategies and processes for meeting the standard. Estimated costs and arsenic exposure reductions at individual suppliers are aggregated to estimate the national compliance cost, arsenic exposure reduction, and resulting bladder cancer risk reduction. Uncertainties in the estimates are characterized based on uncertainties in the occurrence model parameters, existing treatment types, treatment removal efficiencies, costs, and the bladder cancer dose-response function for arsenic.

  4. Environmental pollutants and disease in American children: estimates of morbidity, mortality, and costs for lead poisoning, asthma, cancer, and developmental disabilities.

    PubMed Central

    Landrigan, Philip J; Schechter, Clyde B; Lipton, Jeffrey M; Fahs, Marianne C; Schwartz, Joel

    2002-01-01

    In this study, we aimed to estimate the contribution of environmental pollutants to the incidence, prevalence, mortality, and costs of pediatric disease in American children. We examined four categories of illness: lead poisoning, asthma, cancer, and neurobehavioral disorders. To estimate the proportion of each attributable to toxins in the environment, we used an environmentally attributable fraction (EAF) model. EAFs for lead poisoning, asthma, and cancer were developed by panels of experts through a Delphi process, whereas that for neurobehavioral disorders was based on data from the National Academy of Sciences. We define environmental pollutants as toxic chemicals of human origin in air, food, water, and communities. To develop estimates of costs, we relied on data from the U.S. Environmental Protection Agency, Centers for Disease Control and Prevention, National Center for Health Statistics, the Bureau of Labor Statistics, the Health Care Financing Agency, and the Practice Management Information Corporation. EAFs were judged to be 100% for lead poisoning, 30% for asthma (range, 10-35%), 5% for cancer (range, 2-10%), and 10% for neurobehavioral disorders (range, 5-20%). Total annual costs are estimated to be $54.9 billion (range $48.8-64.8 billion): $43.4 billion for lead poisoning, $2.0 billion for asthma, $0.3 billion for childhood cancer, and $9.2 billion for neurobehavioral disorders. This sum amounts to 2.8 percent of total U.S. health care costs. This estimate is likely low because it considers only four categories of illness, incorporates conservative assumptions, ignores costs of pain and suffering, and does not include late complications for which etiologic associations are poorly quantified. The costs of pediatric environmental disease are high, in contrast with the limited resources directed to research, tracking, and prevention. PMID:12117650

  5. Patient-physician discussions about costs: definitions and impact on cost conversation incidence estimates.

    PubMed

    Hunter, Wynn G; Hesson, Ashley; Davis, J Kelly; Kirby, Christine; Williamson, Lillie D; Barnett, Jamison A; Ubel, Peter A

    2016-03-31

    Nearly one in three Americans are financially burdened by their medical expenses. To mitigate financial distress, experts recommend routine physician-patient cost conversations. However, the content and incidence of these conversations are unclear, and rigorous definitions are lacking. We sought to develop a novel set of cost conversation definitions, and determine the impact of definitional variation on cost conversation incidence in three clinical settings. Retrospective, mixed-methods analysis of transcribed dialogue from 1,755 outpatient encounters for routine clinical management of breast cancer, rheumatoid arthritis, and depression, occurring between 2010-2014. We developed cost conversation definitions using summative content analysis. Transcripts were evaluated independently by at least two members of our multi-disciplinary team to determine cost conversation incidence using each definition. Incidence estimates were compared using Pearson's Chi-Square Tests. Three cost conversation definitions emerged from our analysis: (a) Out-of-Pocket (OoP) Cost--discussion of the patient's OoP costs for a healthcare service; (b) Cost/Coverage--discussion of the patient's OoP costs or insurance coverage; (c) Cost of Illness- discussion of financial costs or insurance coverage related to health or healthcare. These definitions were hierarchical; OoP Cost was a subset of Cost/Coverage, which was a subset of Cost of Illness. In each clinical setting, we observed significant variation in the incidence of cost conversations when using different definitions; breast oncology: 16, 22, 24% of clinic visits contained cost conversation (OOP Cost, Cost/Coverage, Cost of Illness, respectively; P < 0.001); depression: 30, 38, 43%, (P < 0.001); and rheumatoid arthritis, 26, 33, 35%, (P < 0.001). The estimated incidence of physician-patient cost conversation varied significantly depending on the definition used. Our findings and proposed definitions may assist in retrospective interpretation and prospective design of investigations on this topic.

  6. Using a Web-Based System to Estimate the Cost of Online Course Production

    ERIC Educational Resources Information Center

    Gordon, Stuart; He, Wu; Abdous, M'hammed

    2009-01-01

    The increasing demand for online courses requires efficient and low cost production. Since the decision to develop online courses is often affected by financial factors, it is becoming increasingly important to determine, upfront, the cost of online course production. Many of the programs and educators interested in developing online courses…

  7. Economic costs of childhood lead exposure in low- and middle-income countries.

    PubMed

    Attina, Teresa M; Trasande, Leonardo

    2013-09-01

    Children's blood lead levels have declined worldwide, especially after the removal of lead in gasoline. However, significant exposure remains, particularly in low- and middle-income countries. To date, there have been no global estimates of the costs related to lead exposure in children in developing countries. Our main aim was to estimate the economic costs attributable to childhood lead exposure in low- and middle-income countries. We developed a regression model to estimate mean blood lead levels in our population of interest, represented by each 1-year cohort of children < 5 years of age. We used an environmentally attributable fraction model to estimate lead-attributable economic costs and limited our analysis to the neurodevelopmental impacts of lead, assessed as decrements in IQ points. Our main outcome was lost lifetime economic productivity due to early childhood exposure. We estimated a total cost of $977 billions of international dollars in low- and middle-income countries, with economic losses equal to $134.7 billion in Africa [4.03% of gross domestic product (GDP)], $142.3 billion in Latin America and the Caribbean (2.04% of GDP), and $699.9 billion in Asia (1.88% of GDP). Our sensitivity analysis indicates a total economic loss in the range of $728.6-1162.5 billion. We estimated that, in low- and middle-income countries, the burden associated with childhood lead exposure amounts to 1.20% of world GDP in 2011. For comparison, in the United States and Europe lead-attributable economic costs have been estimated at $50.9 and $55 billion, respectively, suggesting that the largest burden of lead exposure is now borne by low- and middle-income countries.

  8. A novel methodology for estimating upper limits of major cost drivers for profitable conceptual launch system architectures

    NASA Astrophysics Data System (ADS)

    Rhodes, Russel E.; Byrd, Raymond J.

    1998-01-01

    This paper presents a ``back of the envelope'' technique for fast, timely, on-the-spot, assessment of affordability (profitability) of commercial space transportation architectural concepts. The tool presented here is not intended to replace conventional, detailed costing methodology. The process described enables ``quick look'' estimations and assumptions to effectively determine whether an initial concept (with its attendant cost estimating line items) provides focus for major leapfrog improvement. The Cost Charts Users Guide provides a generic sample tutorial, building an approximate understanding of the basic launch system cost factors and their representative magnitudes. This process will enable the user to develop a net ``cost (and price) per payload-mass unit to orbit'' incorporating a variety of significant cost drivers, supplemental to basic vehicle cost estimates. If acquisition cost and recurring cost factors (as a function of cost per payload-mass unit to orbit) do not meet the predetermined system-profitability goal, the concept in question will be clearly seen as non-competitive. Multiple analytical approaches, and applications of a variety of interrelated assumptions, can be examined in a quick, (on-the-spot) cost approximation analysis as this tool has inherent flexibility. The technique will allow determination of concept conformance to system objectives.

  9. Development of Economic Factors in Tunnel Construction

    DOT National Transportation Integrated Search

    1977-12-01

    The escalating cost of underground construction of urban transportation systems has made transit planning, especially construction cost estimating, difficult. This is a study of the cost of construction of underground, rapid transit tunnels in soft g...

  10. Software Metrics

    DTIC Science & Technology

    1988-12-01

    software development scene is often charac- c. SPQR Model-Jones terized by: * schedule and cost estimates that are gross-d. COPMO-Thebaut ly inaccurate, SEI...time c. SPQR Model-Jones (in seconds) is simply derived from E by dividing T. Capers Jones has developed a software cost by the Stroud number, S...estimation model called the Software Produc- T=E/S tivity, Quality, and Reliability ( SPQR ) model. The basic approach is similar to that of Boehm’s The value

  11. Improved Methodology for Developing Cost Uncertainty Models for Naval Vessels

    DTIC Science & Technology

    2008-09-01

    Growth: Last 700 Years (From: Deegan , 2007b) ................13 Figure 3. Business Rules to Consider: Choosing an acceptable cost risk point...requires an understanding of consequence (From: Deegan , 2007b)...............16 Figure 4. Basic Steps in Estimating Probable Systems Cost (From: Book...her guidance and assistance in the development of this thesis. Additionally, I thank Mr. Chris Deegan , the former Director of Cost Engineering and

  12. Cost-effectiveness analysis of neonatal hearing screening program in China: should universal screening be prioritized?

    PubMed

    Huang, Li-Hui; Zhang, Luo; Tobe, Ruo-Yan Gai; Qi, Fang-Hua; Sun, Long; Teng, Yue; Ke, Qing-Lin; Mai, Fei; Zhang, Xue-Feng; Zhang, Mei; Yang, Ru-Lan; Tu, Lin; Li, Hong-Hui; Gu, Yan-Qing; Xu, Sai-Nan; Yue, Xiao-Yan; Li, Xiao-Dong; Qi, Bei-Er; Cheng, Xiao-Huan; Tang, Wei; Xu, Ling-Zhong; Han, De-Min

    2012-04-17

    Neonatal hearing screening (NHS) has been routinely offered as a vital component of early childhood care in developed countries, whereas such a screening program is still at the pilot or preliminary stage as regards its nationwide implementation in developing countries. To provide significant evidence for health policy making in China, this study aims to determine the cost-effectiveness of NHS program implementation in case of eight provinces of China. A cost-effectiveness model was conducted and all neonates annually born from 2007 to 2009 in eight provinces of China were simulated in this model. The model parameters were estimated from the established databases in the general hospitals or maternal and child health hospitals of these eight provinces, supplemented from the published literature. The model estimated changes in program implementation costs, disability-adjusted life years (DALYs), average cost-effectiveness ratio (ACER), and incremental cost-effectiveness ratio (ICER) for universal screening compared to targeted screening in eight provinces. A multivariate sensitivity analysis was performed to determine uncertainty in health effect estimates and cost-effectiveness ratios using a probabilistic modeling technique. Targeted strategy trended to be cost-effective in Guangxi, Jiangxi, Henan, Guangdong, Zhejiang, Hebei, Shandong, and Beijing from the level of 9%, 9%, 8%, 4%, 3%, 7%, 5%, and 2%, respectively; while universal strategy trended to be cost-effective in those provinces from the level of 70%, 70%, 48%, 10%, 8%, 28%, 15%, 4%, respectively. This study showed although there was a huge disparity in the implementation of the NHS program in the surveyed provinces, both universal strategy and targeted strategy showed cost-effectiveness in those relatively developed provinces, while neither of the screening strategy showed cost-effectiveness in those relatively developing provinces. This study also showed that both strategies especially universal strategy achieve a good economic effect in the long term costs. Universal screening might be considered as the prioritized implementation goal especially in those relatively developed provinces of China as it provides the best health and economic effects, while targeted screening might be temporarily more realistic than universal screening in those relatively developing provinces of China.

  13. Predicting the economic costs and property value losses attributed to sudden oak death damage in California (2010-2020).

    PubMed

    Kovacs, Kent; Václavík, Tomáš; Haight, Robert G; Pang, Arwin; Cunniffe, Nik J; Gilligan, Christopher A; Meentemeyer, Ross K

    2011-04-01

    Phytophthora ramorum, cause of sudden oak death, is a quarantined, non-native, invasive forest pathogen resulting in substantial mortality in coastal live oak (Quercus agrifolia) and several other related tree species on the Pacific Coast of the United States. We estimate the discounted cost of oak treatment, removal, and replacement on developed land in California communities using simulations of P. ramorum spread and infection risk over the next decade (2010-2020). An estimated 734 thousand oak trees occur on developed land in communities in the analysis area. The simulations predict an expanding sudden oak death (SOD) infestation that will likely encompass most of northwestern California and warrant treatment, removal, and replacement of more than 10 thousand oak trees with discounted cost of $7.5 million. In addition, we estimate the discounted property losses to single family homes of $135 million. Expanding the land base to include developed land outside as well as inside communities doubles the estimates of the number of oak trees killed and the associated costs and losses. The predicted costs and property value losses are substantial, but many of the damages in urban areas (e.g. potential losses from increased fire and safety risks of the dead trees and the loss of ecosystem service values) are not included. Copyright © 2010 Elsevier Ltd. All rights reserved.

  14. Costing behavioral interventions: a practical guide to enhance translation.

    PubMed

    Ritzwoller, Debra P; Sukhanova, Anna; Gaglio, Bridget; Glasgow, Russell E

    2009-04-01

    Cost and cost effectiveness of behavioral interventions are critical parts of dissemination and implementation into non-academic settings. Due to the lack of indicative data and policy makers' increasing demands for both program effectiveness and efficiency, cost analyses can serve as valuable tools in the evaluation process. To stimulate and promote broader use of practical techniques that can be used to efficiently estimate the implementation costs of behavioral interventions, we propose a set of analytic steps that can be employed across a broad range of interventions. Intervention costs must be distinguished from research, development, and recruitment costs. The inclusion of sensitivity analyses is recommended to understand the implications of implementation of the intervention into different settings using different intervention resources. To illustrate these procedures, we use data from a smoking reduction practical clinical trial to describe the techniques and methods used to estimate and evaluate the costs associated with the intervention. Estimated intervention costs per participant were $419, with a range of $276 to $703, depending on the number of participants.

  15. COSTMODL - AN AUTOMATED SOFTWARE DEVELOPMENT COST ESTIMATION TOOL

    NASA Technical Reports Server (NTRS)

    Roush, G. B.

    1994-01-01

    The cost of developing computer software consumes an increasing portion of many organizations' budgets. As this trend continues, the capability to estimate the effort and schedule required to develop a candidate software product becomes increasingly important. COSTMODL is an automated software development estimation tool which fulfills this need. Assimilating COSTMODL to any organization's particular environment can yield significant reduction in the risk of cost overruns and failed projects. This user-customization capability is unmatched by any other available estimation tool. COSTMODL accepts a description of a software product to be developed and computes estimates of the effort required to produce it, the calendar schedule required, and the distribution of effort and staffing as a function of the defined set of development life-cycle phases. This is accomplished by the five cost estimation algorithms incorporated into COSTMODL: the NASA-developed KISS model; the Basic, Intermediate, and Ada COCOMO models; and the Incremental Development model. This choice affords the user the ability to handle project complexities ranging from small, relatively simple projects to very large projects. Unique to COSTMODL is the ability to redefine the life-cycle phases of development and the capability to display a graphic representation of the optimum organizational structure required to develop the subject project, along with required staffing levels and skills. The program is menu-driven and mouse sensitive with an extensive context-sensitive help system that makes it possible for a new user to easily install and operate the program and to learn the fundamentals of cost estimation without having prior training or separate documentation. The implementation of these functions, along with the customization feature, into one program makes COSTMODL unique within the industry. COSTMODL was written for IBM PC compatibles, and it requires Turbo Pascal 5.0 or later and Turbo Professional 5.0 for recompilation. An executable is provided on the distribution diskettes. COSTMODL requires 512K RAM. The standard distribution medium for COSTMODL is three 5.25 inch 360K MS-DOS format diskettes. The contents of the diskettes are compressed using the PKWARE archiving tools. The utility to unarchive the files, PKUNZIP.EXE, is included. COSTMODL was developed in 1991. IBM PC is a registered trademark of International Business Machines. Borland and Turbo Pascal are registered trademarks of Borland International, Inc. Turbo Professional is a trademark of TurboPower Software. MS-DOS is a registered trademark of Microsoft Corporation. Turbo Professional is a trademark of TurboPower Software.

  16. Deep space network software cost estimation model

    NASA Technical Reports Server (NTRS)

    Tausworthe, R. C.

    1981-01-01

    A parametric software cost estimation model prepared for Jet PRopulsion Laboratory (JPL) Deep Space Network (DSN) Data System implementation tasks is described. The resource estimation mdel modifies and combines a number of existing models. The model calibrates the task magnitude and difficulty, development environment, and software technology effects through prompted responses to a set of approximately 50 questions. Parameters in the model are adjusted to fit JPL software life-cycle statistics.

  17. Process-based costing.

    PubMed

    Lee, Robert H; Bott, Marjorie J; Forbes, Sarah; Redford, Linda; Swagerty, Daniel L; Taunton, Roma Lee

    2003-01-01

    Understanding how quality improvement affects costs is important. Unfortunately, low-cost, reliable ways of measuring direct costs are scarce. This article builds on the principles of process improvement to develop a costing strategy that meets both criteria. Process-based costing has 4 steps: developing a flowchart, estimating resource use, valuing resources, and calculating direct costs. To illustrate the technique, this article uses it to cost the care planning process in 3 long-term care facilities. We conclude that process-based costing is easy to implement; generates reliable, valid data; and allows nursing managers to assess the costs of new or modified processes.

  18. Assessing the Cost of Global Biodiversity and Conservation Knowledge.

    PubMed

    Juffe-Bignoli, Diego; Brooks, Thomas M; Butchart, Stuart H M; Jenkins, Richard B; Boe, Kaia; Hoffmann, Michael; Angulo, Ariadne; Bachman, Steve; Böhm, Monika; Brummitt, Neil; Carpenter, Kent E; Comer, Pat J; Cox, Neil; Cuttelod, Annabelle; Darwall, William R T; Di Marco, Moreno; Fishpool, Lincoln D C; Goettsch, Bárbara; Heath, Melanie; Hilton-Taylor, Craig; Hutton, Jon; Johnson, Tim; Joolia, Ackbar; Keith, David A; Langhammer, Penny F; Luedtke, Jennifer; Nic Lughadha, Eimear; Lutz, Maiko; May, Ian; Miller, Rebecca M; Oliveira-Miranda, María A; Parr, Mike; Pollock, Caroline M; Ralph, Gina; Rodríguez, Jon Paul; Rondinini, Carlo; Smart, Jane; Stuart, Simon; Symes, Andy; Tordoff, Andrew W; Woodley, Stephen; Young, Bruce; Kingston, Naomi

    2016-01-01

    Knowledge products comprise assessments of authoritative information supported by standards, governance, quality control, data, tools, and capacity building mechanisms. Considerable resources are dedicated to developing and maintaining knowledge products for biodiversity conservation, and they are widely used to inform policy and advise decision makers and practitioners. However, the financial cost of delivering this information is largely undocumented. We evaluated the costs and funding sources for developing and maintaining four global biodiversity and conservation knowledge products: The IUCN Red List of Threatened Species, the IUCN Red List of Ecosystems, Protected Planet, and the World Database of Key Biodiversity Areas. These are secondary data sets, built on primary data collected by extensive networks of expert contributors worldwide. We estimate that US$160 million (range: US$116-204 million), plus 293 person-years of volunteer time (range: 278-308 person-years) valued at US$ 14 million (range US$12-16 million), were invested in these four knowledge products between 1979 and 2013. More than half of this financing was provided through philanthropy, and nearly three-quarters was spent on personnel costs. The estimated annual cost of maintaining data and platforms for three of these knowledge products (excluding the IUCN Red List of Ecosystems for which annual costs were not possible to estimate for 2013) is US$6.5 million in total (range: US$6.2-6.7 million). We estimated that an additional US$114 million will be needed to reach pre-defined baselines of data coverage for all the four knowledge products, and that once achieved, annual maintenance costs will be approximately US$12 million. These costs are much lower than those to maintain many other, similarly important, global knowledge products. Ensuring that biodiversity and conservation knowledge products are sufficiently up to date, comprehensive and accurate is fundamental to inform decision-making for biodiversity conservation and sustainable development. Thus, the development and implementation of plans for sustainable long-term financing for them is critical.

  19. Assessing the Cost of Global Biodiversity and Conservation Knowledge

    PubMed Central

    Juffe-Bignoli, Diego; Brooks, Thomas M.; Butchart, Stuart H. M.; Jenkins, Richard B.; Boe, Kaia; Hoffmann, Michael; Angulo, Ariadne; Bachman, Steve; Böhm, Monika; Brummitt, Neil; Carpenter, Kent E.; Comer, Pat J.; Cox, Neil; Cuttelod, Annabelle; Darwall, William R. T.; Fishpool, Lincoln D. C.; Goettsch, Bárbara; Heath, Melanie; Hilton-Taylor, Craig; Hutton, Jon; Johnson, Tim; Joolia, Ackbar; Keith, David A.; Langhammer, Penny F.; Luedtke, Jennifer; Nic Lughadha, Eimear; Lutz, Maiko; May, Ian; Miller, Rebecca M.; Oliveira-Miranda, María A.; Parr, Mike; Pollock, Caroline M.; Ralph, Gina; Rodríguez, Jon Paul; Rondinini, Carlo; Smart, Jane; Stuart, Simon; Symes, Andy; Tordoff, Andrew W.; Young, Bruce; Kingston, Naomi

    2016-01-01

    Knowledge products comprise assessments of authoritative information supported by standards, governance, quality control, data, tools, and capacity building mechanisms. Considerable resources are dedicated to developing and maintaining knowledge products for biodiversity conservation, and they are widely used to inform policy and advise decision makers and practitioners. However, the financial cost of delivering this information is largely undocumented. We evaluated the costs and funding sources for developing and maintaining four global biodiversity and conservation knowledge products: The IUCN Red List of Threatened Species, the IUCN Red List of Ecosystems, Protected Planet, and the World Database of Key Biodiversity Areas. These are secondary data sets, built on primary data collected by extensive networks of expert contributors worldwide. We estimate that US$160 million (range: US$116–204 million), plus 293 person-years of volunteer time (range: 278–308 person-years) valued at US$ 14 million (range US$12–16 million), were invested in these four knowledge products between 1979 and 2013. More than half of this financing was provided through philanthropy, and nearly three-quarters was spent on personnel costs. The estimated annual cost of maintaining data and platforms for three of these knowledge products (excluding the IUCN Red List of Ecosystems for which annual costs were not possible to estimate for 2013) is US$6.5 million in total (range: US$6.2–6.7 million). We estimated that an additional US$114 million will be needed to reach pre-defined baselines of data coverage for all the four knowledge products, and that once achieved, annual maintenance costs will be approximately US$12 million. These costs are much lower than those to maintain many other, similarly important, global knowledge products. Ensuring that biodiversity and conservation knowledge products are sufficiently up to date, comprehensive and accurate is fundamental to inform decision-making for biodiversity conservation and sustainable development. Thus, the development and implementation of plans for sustainable long-term financing for them is critical. PMID:27529491

  20. [Costs of maternal-infant care in an institutionalized health care system].

    PubMed

    Villarreal Ríos, E; Salinas Martínez, A M; Guzmán Padilla, J E; Garza Elizondo, M E; Tovar Castillo, N H; García Cornejo, M L

    1998-01-01

    Partial and total maternal and child health care costs were estimated. The study was developed in a Primary Care Health Clinic (PCHC) and a General Hospital (GH) of a social security health care system. Maternal and child health care services, type of activity and frequency utilization during 1995, were defined; cost examination was done separately for the PCHC and the GH. Estimation of fixed cost included departmentalization, determination of inputs, costs, basic services disbursements, and weighing. These data were related to depreciation, labor period and productivity. Estimation of variable costs required the participation of field experts; costs corresponded to those registered in billing records. The fixed cost plus the variable cost determined the unit cost, which multiplied by the of frequency of utilization generated the prenatal care, labor and delivery care, and postnatal care cost. The sum of these three equaled the maternal and child health care cost. The prenatal care cost was $1,205.33, the labor and delivery care cost was $3,313.98, and the postnatal care was $559.91. The total cost of the maternal and child health care corresponded to $5,079.22. Cost information is valuable for the health care personnel for health care planning activities.

  1. National Stormwater Calculator: Low Impact Development ...

    EPA Pesticide Factsheets

    Stormwater discharges continue to cause impairment of our Nation’s waterbodies. EPA has developed the National Stormwater Calculator (SWC) to help support local, state, and national stormwater management objectives to reduce runoff through infiltration and retention using green infrastructure practices as low impact development (LID) controls. The primary focus of the SWC is to inform site developers on how well they can meet a desired stormwater retention target with and without the use of green infrastructure. It can also be used by landscapers and homeowners. Platform. The SWC is a Windows-based desktop program that requires an internet connection. A mobile web application version that will be compatible with all operating systems is currently being developed and is expected to be released in the fall of 2017.Cost Module. An LID cost estimation module within the application allows planners and managers to evaluate LID controls based on comparison of regional and national project planning level cost estimates (capital and average annual maintenance) and predicted LID control performance. Cost estimation is accomplished based on user-identified size configuration of the LID control infrastructure and other key project and site-specific variables. This includes whether the project is being applied as part of new development or redevelopment and if there are existing site constraints.Climate Scenarios. The SWC allows users to consider how runoff may vary based

  2. Estimating Suicide Rates in Developing Nations: A Low-Cost Newspaper Capture-Recapture Approach in Cambodia.

    PubMed

    Harris, Keith M; Thandrayen, Joanne; Samphoas, Chien; Se, Pros; Lewchalermwongse, Boontriga; Ratanashevorn, Rattanakorn; Perry, Megan L; Britts, Choloe

    2016-04-01

    This study tested a low-cost method for estimating suicide rates in developing nations that lack adequate statistics. Data comprised reported suicides from Cambodia's 2 largest newspapers. Capture-recapture modeling estimated a suicide rate of 3.8/100 000 (95% CI = 2.5-6.7) for 2012. That compares to World Health Organization estimates of 1.3 to 9.4/100 000 and a Cambodian government estimate of 3.5/100 000. Suicide rates of males were twice that of females, and rates of those <40 years were twice that of those ≥40 years. Capture-recapture modeling with newspaper reports proved a reasonable method for estimating suicide rates for countries with inadequate official data. These methods are low-cost and can be applied to regions with at least 2 newspapers with overlapping reports. Means to further improve this approach are discussed. These methods are applicable to both recent and historical data, which can benefit epidemiological work, and may also be applicable to homicides and other statistics. © 2016 APJPH.

  3. Risk and Vulnerability Assessment Using Cybernomic Computational Models: Tailored for Industrial Control Systems

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Abercrombie, Robert K; Sheldon, Federick T.; Schlicher, Bob G

    2015-01-01

    There are many influencing economic factors to weigh from the defender-practitioner stakeholder point-of-view that involve cost combined with development/deployment models. Some examples include the cost of countermeasures themselves, the cost of training and the cost of maintenance. Meanwhile, we must better anticipate the total cost from a compromise. The return on investment in countermeasures is essentially impact costs (i.e., the costs from violating availability, integrity and confidentiality / privacy requirements). The natural question arises about choosing the main risks that must be mitigated/controlled and monitored in deciding where to focus security investments. To answer this question, we have investigated themore » cost/benefits to the attacker/defender to better estimate risk exposure. In doing so, it s important to develop a sound basis for estimating the factors that derive risk exposure, such as likelihood that a threat will emerge and whether it will be thwarted. This impact assessment framework can provide key information for ranking cybersecurity threats and managing risk.« less

  4. 2012 NASA Cost Estimating Handbook Highlights

    NASA Technical Reports Server (NTRS)

    Rosenberg, Leigh; Stukes, Sherry

    2012-01-01

    The major goal is to ensure that appropriate policy is adopted and that best practices are being developed, communicated, and used across the Agency. -- Accomplished by engaging the NASA Cost Estimating Community representatives in the update. Scheduled to be complete by the end of FY 2012. Document has been through 3 detailed reviews across NASA.

  5. An Assessment of the Adequacy of Ohio School Funding: New Performance Standards and Alternative Measurements of Adequacy

    ERIC Educational Resources Information Center

    Sweetland, Scott R.

    2015-01-01

    Reflecting upon "Rose v. Council," this research traced the development of adequate school funding in Ohio. "DeRolph v. State" centered the constitutional requirement for adequate education in Ohio. Thereafter, scholars estimated costs of adequate education and legislators adjusted those estimated costs. Plaintiffs and justices…

  6. Regression Analysis as a Cost Estimation Model for Unexploded Ordnance Cleanup at Former Military Installations

    DTIC Science & Technology

    2002-06-01

    fits our actual data . To determine the goodness of fit, statisticians typically use the following four measures: R2 Statistic. The R2 statistic...reviewing instruction, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of...mathematical model is developed to better estimate cleanup costs using historical cost data that could be used by the Defense Department prior to placing

  7. Costs of illness of multiple sclerosis in Sweden: a population-based register study of people of working age.

    PubMed

    Gyllensten, Hanna; Wiberg, Michael; Alexanderson, Kristina; Norlund, Anders; Friberg, Emilie; Hillert, Jan; Ernstsson, Olivia; Tinghög, Petter

    2018-04-01

    Multiple sclerosis (MS) causes work disability and healthcare resource use, but little is known about the distribution of the associated costs to society. We estimated the cost of illness (COI) of working-aged individuals with MS, from the societal perspective, overall and in different groups. A population-based study was conducted, using data linked from several nationwide registers, on 14,077 individuals with MS, aged 20-64 years and living in Sweden. Prevalence-based direct and indirect costs in 2010 were calculated, including costs for prescription drug use, specialized healthcare, sick leave, and disability pension. The estimated COI of all the MS patients were SEK 3950 million, of which 75% were indirect costs. MS was the main diagnosis for resource use, causing 38% of healthcare costs and 67% of indirect costs. The distribution of costs was skewed, in which less than 25% of the patients accounted for half the total COI. Indirect costs contributed to approximately 75% of the estimated overall COI of MS patients of working age in Sweden. MS was the main diagnosis for more than half of the estimated COI in this patient group. Further studies are needed to gain knowledge on development of costs over time during the MS disease course.

  8. Cost-effectiveness of health-related lifestyle advice delivered by peer or lay advisors: synthesis of evidence from a systematic review

    PubMed Central

    2013-01-01

    Background Development of new peer or lay health-related lifestyle advisor (HRLA) roles is one response to the need to enhance public engagement in, and improve cost-effectiveness of, health improvement interventions. This article synthesises evidence on the cost-effectiveness of HRLA interventions aimed at adults in developed countries, derived from the first systematic review of the effectiveness, cost-effectiveness, equity and acceptability of different types of HRLA role. Methods The best available evidence on the cost-effectiveness of HRLA interventions was obtained using systematic searches of 20 electronic databases and key journals, as well as searches of the grey literature and the internet. Interventions were classified according to the primary health behaviour targeted and intervention costs were estimated where necessary. Lifetime health gains were estimated (in quality-adjusted life years, where possible), based on evidence of effectiveness of HRLAs in combination with published estimates of the lifetime health gains resulting from lifestyle changes, and assumptions over relapse. Incremental cost-effectiveness ratios are reported. Results Evidence of the cost-effectiveness of HRLAs was identified from 24 trials included in the systematic review. The interventions were grouped into eight areas. We found little evidence of effectiveness of HRLAs for promotion of exercise/improved diets. Where HRLAs were effective cost-effectiveness varied considerably: Incremental Cost effectiveness Ratios were estimated at £6,000 for smoking cessation; £14,000 for a telephone based type 2 diabetes management; and £250,000 or greater for promotion of mammography attendance and for HIV prevention amongst drug users. We lacked sufficient evidence to estimate ICERs for breastfeeding promotion and mental health promotion, or to assess the impact of HRLAs on health inequalities. Conclusions Overall, there is limited evidence suggesting that HRLAs are cost-effective in terms of changing health-related knowledge, behaviours or health outcomes. The evidence that does exist indicates that HRLAs are only cost-effective when they target behaviours likely to have a large impact on overall health-related quality of life. Further development of HRLA interventions needs to target specific population health needs where potential exists for significant improvement, and include rigorous evaluation to ensure that HRLAs provide sufficient value for money. PMID:24304826

  9. Maximizing mitigation benefits: research to support a mitigation cost framework-final report.

    DOT National Transportation Integrated Search

    2016-08-01

    Tracking environmental costs in the project development process has been a challenging task for state : departments of transportation (DOTs). Previous research identified the need to accurately track and : subsequently estimate project costs resultin...

  10. X-1 to X-Wings: Developing a Parametric Cost Model

    NASA Technical Reports Server (NTRS)

    Sterk, Steve; McAtee, Aaron

    2015-01-01

    In todays cost-constrained environment, NASA needs an X-Plane database and parametric cost model that can quickly provide rough order of magnitude predictions of cost from initial concept to first fight of potential X-Plane aircraft. This paper takes a look at the steps taken in developing such a model and reports the results. The challenges encountered in the collection of historical data and recommendations for future database management are discussed. A step-by-step discussion of the development of Cost Estimating Relationships (CERs) is then covered.

  11. Analyzing the requirements for mass production of small wind turbine generators

    NASA Astrophysics Data System (ADS)

    Anuskiewicz, T.; Asmussen, J.; Frankenfield, O.

    Mass producibility of small wind turbine generators to give manufacturers design and cost data for profitable production operations is discussed. A 15 kW wind turbine generator for production in annual volumes from 1,000 to 50,000 units is discussed. Methodology to cost the systems effectively is explained. The process estimate sequence followed is outlined with emphasis on the process estimate sheets compiled for each component and subsystem. These data enabled analysts to develop cost breakdown profiles crucial in manufacturing decision-making. The appraisal also led to various design recommendations including replacement of aluminum towers with cost effective carbon steel towers. Extensive cost information is supplied in tables covering subassemblies, capital requirements, and levelized energy costs. The physical layout of the plant is depicted to guide manufacturers in taking advantage of the growing business opportunity now offered in conjunction with the national need for energy development.

  12. Economic evaluation of a comprehensive teenage pregnancy prevention program: pilot program.

    PubMed

    Rosenthal, Marjorie S; Ross, Joseph S; Bilodeau, Roseanne; Richter, Rosemary S; Palley, Jane E; Bradley, Elizabeth H

    2009-12-01

    Previous research has suggested that comprehensive teenage pregnancy prevention programs that address sexual education and life skills development and provide academic support are effective in reducing births among enrolled teenagers. However, there have been limited data on the costs and cost effectiveness of such programs. The study used a community-based participatory research approach to develop estimates of the cost-benefit of the Pathways/Senderos Center, a comprehensive neighborhood-based program to prevent unintended pregnancies and promote positive development for adolescents. Using data from 1997-2003, an in-time intervention analysis was conducted to determine program cost-benefit while teenagers were enrolled; an extrapolation analysis was then used to estimate accrued economic benefits and cost-benefit up to age 30 years. The program operating costs totaled $3,228,152.59 and reduced the teenage childbearing rate from 94.10 to 40.00 per 1000 teenage girls, averting $52,297.84 in total societal costs, with an economic benefit to society from program participation of $2,673,153.11. Therefore, total costs to society exceeded economic benefits by $559,677.05, or $1599.08 per adolescent per year. In an extrapolation analysis, benefits to society exceed costs by $10,474.77 per adolescent per year by age 30 years on average, with social benefits outweighing total social costs by age 20.1 years. This comprehensive teenage pregnancy prevention program is estimated to provide societal economic benefits once participants are young adults, suggesting the need to expand beyond pilot demonstrations and evaluate the long-range cost effectiveness of similarly comprehensive programs when they are implemented more widely in high-risk neighborhoods.

  13. Economic Evaluation of a Comprehensive Teenage Pregnancy Prevention Program: Pilot Program

    PubMed Central

    Rosenthal, Marjorie S.; Ross, Joseph S.; Bilodeau, RoseAnne; Richter, Rosemary S.; Palley, Jane E.; Bradley, Elizabeth H.

    2011-01-01

    Background Previous research has suggested that comprehensive teenage pregnancy prevention programs that address sexual education and life skills development and provide academic are effective in reducing births among enrolled teenagers. However, there have been limited data on costs and cost-effectiveness of such programs. Objectives To use a community-based participatory research approach, to develop estimates of the cost-benefit of the Pathways/Senderos Center, a comprehensive neighborhood-based program to prevent unintended pregnancies and promote positive development for adolescents. Methods Using data from 1997-2003, we conducted an in-time intervention analysis to determine program cost-benefit while teenagers were enrolled and then used an extrapolation analysis to estimate accyrred economibc benefits and cost-benefit up to age 30. Results The program operating costs totaled $3,228,152.59 and reduced the teenage childbearing rate from 94.10 to 40.00 per 1000 teenage females, averting $52,297.84 in total societal costs, with an economic benefit to society from program participation of $2,673,153.11. Therefore, total costs to society exceeded economic benefits by $559,677.05, or $1,599.08 per adolescent per year. In an extrapolation analysis, benefits to society exceed costs by $10,474.77 per adolescent per year by age 30 on average, with social benefits outweighing total social costs by age 20.1. Conclusions We estimate that this comprehensive teenage pregnancy prevention program would provide societal economic benefits once participants are young adults, suggesting the need to expand beyond pilot demonstrations and evaluate the long-range cost-effectiveness of similarly comprehensive programs when implemented more widely in high-risk neighborhoods. PMID:19896030

  14. The MERMAID project

    NASA Technical Reports Server (NTRS)

    Cowderoy, A. J. C.; Jenkins, John O.; Poulymenakou, A

    1992-01-01

    The tendency for software development projects to be completed over schedule and over budget was documented extensively. Additionally many projects are completed within budgetary and schedule target only as a result of the customer agreeing to accept reduced functionality. In his classic book, The Mythical Man Month, Fred Brooks exposes the fallacy that effort and schedule are freely interchangeable. All current cost models are produced on the assumption that there is very limited scope for schedule compression unless there is a corresponding reduction in delivered functionality. The Metrication and Resources Modeling Aid (MERMAID) project, partially financed by the Commission of the European Communities (CEC) as Project 2046 began in Oct. 1988 and its goal were as follows: (1) improvement of understanding of the relationships between software development productivity and product and process metrics; (2) to facilitate the widespread technology transfer from the Consortium to the European Software Industry; and (3) to facilitate the widespread uptake of cost estimation techniques by the provision of prototype cost estimation tools. MERMAID developed a family of methods for cost estimation, many of which have had tools implemented in prototypes. These prototypes are best considered as toolkits or workbenches.

  15. The Cost of Universal Health Care in India: A Model Based Estimate

    PubMed Central

    Prinja, Shankar; Bahuguna, Pankaj; Pinto, Andrew D.; Sharma, Atul; Bharaj, Gursimer; Kumar, Vishal; Tripathy, Jaya Prasad; Kaur, Manmeet; Kumar, Rajesh

    2012-01-01

    Introduction As high out-of-pocket healthcare expenses pose heavy financial burden on the families, Government of India is considering a variety of financing and delivery options to universalize health care services. Hence, an estimate of the cost of delivering universal health care services is needed. Methods We developed a model to estimate recurrent and annual costs for providing health services through a mix of public and private providers in Chandigarh located in northern India. Necessary health services required to deliver good quality care were defined by the Indian Public Health Standards. National Sample Survey data was utilized to estimate disease burden. In addition, morbidity and treatment data was collected from two secondary and two tertiary care hospitals. The unit cost of treatment was estimated from the published literature. For diseases where data on treatment cost was not available, we collected data on standard treatment protocols and cost of care from local health providers. Results We estimate that the cost of universal health care delivery through the existing mix of public and private health institutions would be INR 1713 (USD 38, 95%CI USD 18–73) per person per annum in India. This cost would be 24% higher, if branded drugs are used. Extrapolation of these costs to entire country indicates that Indian government needs to spend 3.8% (2.1%–6.8%) of the GDP for universalizing health care services. Conclusion The cost of universal health care delivered through a combination of public and private providers is estimated to be INR 1713 per capita per year in India. Important issues such as delivery strategy for ensuring quality, reducing inequities in access, and managing the growth of health care demand need be explored. PMID:22299038

  16. Coal supply and cost under technological and environmental uncertainty

    NASA Astrophysics Data System (ADS)

    Chan, Melissa

    This thesis estimates available coal resources, recoverability, mining costs, environmental impacts, and environmental control costs for the United States under technological and environmental uncertainty. It argues for a comprehensive, well-planned research program that will resolve resource uncertainty, and innovate new technologies to improve recovery and environmental performance. A stochastic process and cost (constant 2005) model for longwall, continuous, and surface mines based on current technology and mining practice data was constructed. It estimates production and cost ranges within 5-11 percent of 2006 prices and production rates. The model was applied to the National Coal Resource Assessment. Assuming the cheapest mining method is chosen to extract coal, 250-320 billion tons are recoverable. Two-thirds to all coal resource can be mined at a cost less than 4/mmBTU. If U.S. coal demand substantially increases, as projected by alternate Energy Information Administration (EIA), resources might not last more than 100 years. By scheduling cost to meet EIA projected demand, estimated cost uncertainty increases over time. It costs less than 15/ton to mine in the first 10 years of a 100 year time period, 10-30/ton in the following 50 years, and 15-$90/ton thereafter. Environmental impacts assessed are subsidence from underground mines, surface mine pit area, erosion, acid mine drainage, air pollutant and methane emissions. The analysis reveals that environmental impacts are significant and increasing as coal demand increases. Control technologies recommended to reduce these impacts are backfilling underground mines, surface pit reclamation, substitution of robotic underground mining systems for surface pit mining, soil replacement for erosion, placing barriers between exposed coal and the elements to avoid acid formation, and coalbed methane development to avoid methane emissions during mining. The costs to apply these technologies to meet more stringent environmental regulation scenarios are estimated. The results show that the cost of meeting these regulatory scenarios could increase mining costs two to six times the business as usual cost, which could significantly affect the cost of coal-powered electricity generation. This thesis provides a first estimate of resource availability, mining cost, and environmental impact assessment and cost analysis. Available resource is not completely reported, so the available estimate is lower than actual resource. Mining costs are optimized, so provide a low estimate of potential costs. Environmental impact estimates are on the high end of potential impact that may be incurred because it is assumed that impact is unavoidable. Control costs vary. Estimated cost to control subsidence and surface mine pit impacts are suitable estimates of the cost to reduce land impacts. Erosion control and robotic mining system costs are lower, and methane and acid mine drainage control costs are higher, than they may be in the case that these impacts must be reduced.

  17. Health economics in drug development: efficient research to inform healthcare funding decisions.

    PubMed

    Hall, Peter S; McCabe, Christopher; Brown, Julia M; Cameron, David A

    2010-10-01

    In order to decide whether a new treatment should be used in patients, a robust estimate of efficacy and toxicity is no longer sufficient. As a result of increasing healthcare costs across the globe healthcare payers and providers now seek estimates of cost-effectiveness as well. Most trials currently being designed still only consider the need for prospective efficacy and toxicity data during the development life-cycle of a new intervention. Hence the cost-effectiveness estimates are inevitably less precise than the clinical data on which they are based. Methods based on decision theory are being developed by health economists that can contribute to the design of clinical trials in such a way that they can more effectively lead to better informed drug funding decisions on the basis of cost-effectiveness in addition to clinical outcomes. There is an opportunity to apply these techniques prospectively in the design of future clinical trials. This article describes the problems encountered by those responsible for drug reimbursement decisions as a consequence of the current drug development pathway. The potential for decision theoretic methods to help overcome these problems is introduced and potential obstacles in implementation are highlighted. Copyright © 2010 Elsevier Ltd. All rights reserved.

  18. Breast cancer management: quality-of-life and cost considerations.

    PubMed

    Radice, Davide; Redaelli, Alberto

    2003-01-01

    The purpose of this article was to provide a literature-based extensive overview of the quality-of-life and cost issues posed by the management of breast cancer. Incidence and mortality rates vary widely in different countries. Breast cancer accounts approximately for one-fifth of all deaths in women aged 40-50 years. The 1994-1998 incidence rate in the US population was on average 114.3 per 100 000 women. Treatment options include surgery, radiotherapy and drug therapy (cytotoxic and endocrine drugs). All treatment options affect patients' health-related quality of life (HR-QOL) in various ways. The use of cytotoxic agents has a particularly large HR-QOL impact. HR-QOL questionnaires are complex tools, not routinely used in breast cancer trials.Worldwide, around 10 million individuals develop cancer each year; this figure is expected to increase to 15 million in 2020. For all cancers, the total economic burden of this disease worldwide was projected by the authors to be in the range of $US 300-400 billion in 2001 (about $US 100-140 billion as direct costs and the remainder as indirect costs [morbidity and mortality]). According to the National Institute of Health (NIH), the total cost of cancer was estimated at $US 156.7 billion in 2001 in US ($US 56.4 billion as direct costs, $US 15.6 as indirect morbidity costs, and $US 84.7 billion as indirect mortality costs). Based on limited information, in the US, breast cancer can be projected to account for about one-fifth/one-fourth of the total cost of cancer. Breast cancer treatment costs are higher in the US than in other developed countries. Both direct and indirect costs are dependent on disease stage. The per-patient costs for initial care in 1992 were estimated at $US 10 813, for continuing care at $US 1084 and for terminal care at $US 17 886. Stage-specific costs provide information for cost-effectiveness analyses of cancer-control initiatives, such as screening programmes. Economic studies on breast cancer are heterogeneous, and the cost estimates made are not easily generalisable. The cost of treatment for breast cancer in developing countries is < or =5% of that in developed regions.

  19. Economic Costs of Childhood Lead Exposure in Low- and Middle-Income Countries

    PubMed Central

    Trasande, Leonardo

    2013-01-01

    Background: Children’s blood lead levels have declined worldwide, especially after the removal of lead in gasoline. However, significant exposure remains, particularly in low- and middle-income countries. To date, there have been no global estimates of the costs related to lead exposure in children in developing countries. Objective: Our main aim was to estimate the economic costs attributable to childhood lead exposure in low- and middle-income countries. Methods: We developed a regression model to estimate mean blood lead levels in our population of interest, represented by each 1-year cohort of children < 5 years of age. We used an environmentally attributable fraction model to estimate lead-attributable economic costs and limited our analysis to the neurodevelopmental impacts of lead, assessed as decrements in IQ points. Our main outcome was lost lifetime economic productivity due to early childhood exposure. Results: We estimated a total cost of $977 billions of international dollars in low- and middle-income countries, with economic losses equal to $134.7 billion in Africa [4.03% of gross domestic product (GDP)], $142.3 billion in Latin America and the Caribbean (2.04% of GDP), and $699.9 billion in Asia (1.88% of GDP). Our sensitivity analysis indicates a total economic loss in the range of $728.6–1162.5 billion. Conclusions: We estimated that, in low- and middle-income countries, the burden associated with childhood lead exposure amounts to 1.20% of world GDP in 2011. For comparison, in the United States and Europe lead-attributable economic costs have been estimated at $50.9 and $55 billion, respectively, suggesting that the largest burden of lead exposure is now borne by low- and middle-income countries. Citation: Attina TM, Trasande L. 2013. Economic costs of childhood lead exposure in low- and middle-income countries. Environ Health Perspect 121:1097–1102; http://dx.doi.org/10.1289/ehp.1206424 PMID:23797342

  20. Alternative transportation fuels: Infrastructure requirements and environmental impacts for ethanol and hydrogen

    NASA Astrophysics Data System (ADS)

    Wakeley, Heather L.

    Alternative fuels could replace a significant portion of the 140 billion gallons of annual US gasoline use. Considerable attention is being paid to processes and technologies for producing alternative fuels, but an enormous investment in new infrastructure will be needed to have substantial impact on the demand for petroleum. The economics of production, distribution, and use, along with environmental impacts of these fuels, will determine the success or failure of a transition away from US petroleum dependence. This dissertation evaluates infrastructure requirements for ethanol and hydrogen as alternative fuels. It begins with an economic case study for ethanol and hydrogen in Iowa. A large-scale linear optimization model is developed to estimate average transportation distances and costs for nationwide ethanol production and distribution systems. Environmental impacts of transportation in the ethanol life cycle are calculated using the Economic Input-Output Life Cycle Assessment (EIO-LCA) model. An EIO-LCA Hybrid method is developed to evaluate impacts of future fuel production technologies. This method is used to estimate emissions for hydrogen production and distribution pathways. Results from the ethanol analyses indicate that the ethanol transportation cost component is significant and is the most variable. Costs for ethanol sold in the Midwest, near primary production centers, are estimated to be comparable to or lower than gasoline costs. Along with a wide range of transportation costs, environmental impacts for ethanol range over three orders of magnitude, depending on the transport required. As a result, intensive ethanol use should be encouraged near ethanol production areas. Fossil fuels are likely to remain the primary feedstock sources for hydrogen production in the near- and mid-term. Costs and environmental impacts of hydrogen produced from natural gas and transported by pipeline are comparable to gasoline. However, capital costs are prohibitive and a significant increase in natural gas demand will likely raise both prices and import quantities. There is an added challenge of developing hydrogen fuel cell vehicles at costs comparable to conventional vehicles. Two models developed in this thesis have proven useful for evaluating alternative fuels. The linear programming models provide representative estimates of distribution distances for regional fuel use, and thus can be used to estimate costs and environmental impacts. The EIO-LCA Hybrid method is useful for estimating emissions from hydrogen production. This model includes upstream impacts in the LCA, and has the benefit of a lower time and data requirements than a process-based LCA.

  1. Development Of Regional Climate Mitigation Baseline For A DominantAgro-Ecological Zone Of Karnataka, India

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sudha, P.; Shubhashree, D.; Khan, H.

    2007-06-01

    Setting a baseline for carbon stock changes in forest andland use sector mitigation projects is an essential step for assessingadditionality of the project. There are two approaches for settingbaselines namely, project-specific and regional baseline. This paperpresents the methodology adopted for estimating the land available formitigation, for developing a regional baseline, transaction cost involvedand a comparison of project-specific and regional baseline. The studyshowed that it is possible to estimate the potential land and itssuitability for afforestation and reforestation mitigation projects,using existing maps and data, in the dry zone of Karnataka, southernIndia. The study adopted a three-step approach for developing a regionalbaseline,more » namely: i) identification of likely baseline options for landuse, ii) estimation of baseline rates of land-use change, and iii)quantification of baseline carbon profile over time. The analysis showedthat carbon stock estimates made for wastelands and fallow lands forproject-specific as well as the regional baseline are comparable. Theratio of wasteland Carbon stocks of a project to regional baseline is1.02, and that of fallow lands in the project to regional baseline is0.97. The cost of conducting field studies for determination of regionalbaseline is about a quarter of the cost of developing a project-specificbaseline on a per hectare basis. The study has shown the reliability,feasibility and cost-effectiveness of adopting regional baseline forforestry sectormitigation projects.« less

  2. Methodological Considerations in Social Cost Studies of Addictive Substances: A Systematic Literature Review.

    PubMed

    Verhaeghe, Nick; Lievens, Delfine; Annemans, Lieven; Vander Laenen, Freya; Putman, Koen

    2016-01-01

    Alcohol, tobacco, illicit drugs, and psychoactive pharmaceuticals' use is associated with a higher likelihood of developing several diseases and injuries and, as a consequence, considerable health-care expenditures. There is yet a lack of consistent methodologies to estimate the economic impact of addictive substances to society. The aim was to assess the methodological approaches applied in social cost studies estimating the economic impact of alcohol, tobacco, illicit drugs, and psychoactive pharmaceuticals. A systematic literature review through the electronic databases, Medline (PubMed) and Web of Science, was performed. Studies in English published from 1997 examining the social costs of the addictive substances alcohol, tobacco, illicit drugs, and psychoactive pharmaceuticals were eligible for inclusion. Twelve social cost studies met the inclusion criteria. In all studies, the direct and indirect costs were measured, but the intangible costs were seldom taken into account. A wide variety in cost items included across studies was observed. Sensitivity analyses to address the uncertainty around certain cost estimates were conducted in eight studies considered in the review. Differences in cost items included in cost-of-illness studies limit the comparison across studies. It is clear that it is difficult to deal with all consequences of substance use in cost-of-illness studies. Future social cost studies should be based on sound methodological principles in order to result in more reliable cost estimates of the economic burden of substance use.

  3. CubeSat mission design software tool for risk estimating relationships

    NASA Astrophysics Data System (ADS)

    Gamble, Katharine Brumbaugh; Lightsey, E. Glenn

    2014-09-01

    In an effort to make the CubeSat risk estimation and management process more scientific, a software tool has been created that enables mission designers to estimate mission risks. CubeSat mission designers are able to input mission characteristics, such as form factor, mass, development cycle, and launch information, in order to determine the mission risk root causes which historically present the highest risk for their mission. Historical data was collected from the CubeSat community and analyzed to provide a statistical background to characterize these Risk Estimating Relationships (RERs). This paper develops and validates the mathematical model based on the same cost estimating relationship methodology used by the Unmanned Spacecraft Cost Model (USCM) and the Small Satellite Cost Model (SSCM). The RER development uses general error regression models to determine the best fit relationship between root cause consequence and likelihood values and the input factors of interest. These root causes are combined into seven overall CubeSat mission risks which are then graphed on the industry-standard 5×5 Likelihood-Consequence (L-C) chart to help mission designers quickly identify areas of concern within their mission. This paper is the first to document not only the creation of a historical database of CubeSat mission risks, but, more importantly, the scientific representation of Risk Estimating Relationships.

  4. Cost of stroke in Australia from a societal perspective: results from the North East Melbourne Stroke Incidence Study (NEMESIS).

    PubMed

    Dewey, H M; Thrift, A G; Mihalopoulos, C; Carter, R; Macdonell, R A; McNeil, J J; Donnan, G A

    2001-10-01

    Accurate information about resource use and costs of stroke is necessary for informed health service planning. The purpose of this study was to determine the patterns of resource use among stroke patients and to estimate the total costs (direct service use and indirect production losses) of stroke (excluding SAH) in Australia for 1997. An incidence-based cost-of-illness model was developed, incorporating data obtained from the North East Melbourne Stroke Incidence Study (NEMESIS). The costs of stroke during the first year after stroke and the present value of total lifetime costs of stroke were estimated. The total first-year costs of all first-ever-in-a lifetime strokes (SAH excluded) that occurred in Australia during 1997 were estimated to be A$555 million (US$420 million), and the present value of lifetime costs was estimated to be A$1.3 billion (US$985 million). The average cost per case during the first 12 months and over a lifetime was A$18 956 (US$14 361) and A$44 428 (US$33 658), respectively. The most important categories of cost during the first year were acute hospitalization (A$154 million), inpatient rehabilitation (A$150 million), and nursing home care (A$63 million). The present value of lifetime indirect costs was estimated to be A$34 million. Similar to other studies, hospital and nursing home costs contributed most to the total cost of stroke (excluding SAH) in Australia. Inpatient rehabilitation accounts for approximately 27% of total first-year costs. Given the magnitude of these costs, investigation of the cost-effectiveness of rehabilitation services should become a priority in this community.

  5. Automobile Industry Retail Price Equivalent and Indirect Cost ...

    EPA Pesticide Factsheets

    This report develops a modified multiplier, referred to as an indirect cost (IC) multiplier, which specifically evaluates the components of indirect costs that are likely to be affected by vehicle modifications associated with environmental regulation. A range of IC multipliers are developed that 1) account for differences in the technical complexity of required vehicle modifications and 2) adjust over time as new technologies become assimilated into the automotive production process. To develop an improved methodology for estimating indirect costs of new environmental regulations on automobile manufacturers.

  6. Economic burden of torture for a refugee host country: development of a model and presentation of a country case study.

    PubMed

    Mpinga, Emmanuel Kabengele; Frey, Conrad; Chastonay, Philippe

    2014-01-01

    Torture is an important social and political problem worldwide that affects millions of people. Many host countries give victims of torture the status of refugee and take care of them as far as basic needs; health care, professional reinsertion, and education. Little is known about the costs of torture. However, this knowledge could serve as an additional argument for the prevention and social mobilization to fight against torture and to provide a powerful basis of advocacy for rehabilitation programs and judiciary claims. Development of a model for estimating the economic costs of torture and applying the model to a specific country. The estimation of the possible prevalence of victims of torture was based on a review of the literature. The identification of the socioeconomic factors to be considered was done by analogy with various health problems. The estimation of the loss of the productivity and of the economic burden of disease related to torture was done through the human capital approach and the component technique analysis. The model was applied to the situation in Switzerland of estimated torture victims Switzerland is confronted with. When applied to the case study, the direct costs - such as housing, food, and clothing - represent roughly 130 million Swiss francs (CHF) per year; whereas, health care costs amount to 16 million CHF per year, and the costs related to education of young people to 34 million CHF per year. Indirect costs, namely those costs related to the loss of the productivity of direct survivors of torture, have been estimated to one-third of 1 billion CHF per year. This jumps to 10,073,419,200 CHF in the loss of productivity if one would consider 30 years of loss per survivor. Our study shows that a rough estimation of the costs related to torture is possible with some prerequisites, such as access to social and economic indicators at the country level.

  7. Wastewater Treatment Costs and Outlays in Organic Petrochemicals: Standards Versus Taxes With Methodology Suggestions for Marginal Cost Pricing and Analysis

    NASA Astrophysics Data System (ADS)

    Thompson, Russell G.; Singleton, F. D., Jr.

    1986-04-01

    With the methodology recommended by Baumol and Oates, comparable estimates of wastewater treatment costs and industry outlays are developed for effluent standard and effluent tax instruments for pollution abatement in five hypothetical organic petrochemicals (olefins) plants. The computational method uses a nonlinear simulation model for wastewater treatment to estimate the system state inputs for linear programming cost estimation, following a practice developed in a National Science Foundation (Research Applied to National Needs) study at the University of Houston and used to estimate Houston Ship Channel pollution abatement costs for the National Commission on Water Quality. Focusing on best practical and best available technology standards, with effluent taxes adjusted to give nearly equal pollution discharges, shows that average daily treatment costs (and the confidence intervals for treatment cost) would always be less for the effluent tax than for the effluent standard approach. However, industry's total outlay for these treatment costs, plus effluent taxes, would always be greater for the effluent tax approach than the total treatment costs would be for the effluent standard approach. Thus the practical necessity of showing smaller outlays as a prerequisite for a policy change toward efficiency dictates the need to link the economics at the microlevel with that at the macrolevel. Aggregation of the plants into a programming modeling basis for individual sectors and for the economy would provide a sound basis for effective policy reform, because the opportunity costs of the salient regulatory policies would be captured. Then, the government's policymakers would have the informational insights necessary to legislate more efficient environmental policies in light of the wealth distribution effects.

  8. Improving The Discipline of Cost Estimation and Analysis

    NASA Technical Reports Server (NTRS)

    Piland, William M.; Pine, David J.; Wilson, Delano M.

    2000-01-01

    The need to improve the quality and accuracy of cost estimates of proposed new aerospace systems has been widely recognized. The industry has done the best job of maintaining related capability with improvements in estimation methods and giving appropriate priority to the hiring and training of qualified analysts. Some parts of Government, and National Aeronautics and Space Administration (NASA) in particular, continue to need major improvements in this area. Recently, NASA recognized that its cost estimation and analysis capabilities had eroded to the point that the ability to provide timely, reliable estimates was impacting the confidence in planning many program activities. As a result, this year the Agency established a lead role for cost estimation and analysis. The Independent Program Assessment Office located at the Langley Research Center was given this responsibility. This paper presents the plans for the newly established role. Described is how the Independent Program Assessment Office, working with all NASA Centers, NASA Headquarters, other Government agencies, and industry, is focused on creating cost estimation and analysis as a professional discipline that will be recognized equally with the technical disciplines needed to design new space and aeronautics activities. Investments in selected, new analysis tools, creating advanced training opportunities for analysts, and developing career paths for future analysts engaged in the discipline are all elements of the plan. Plans also include increasing the human resources available to conduct independent cost analysis of Agency programs during their formulation, to improve near-term capability to conduct economic cost-benefit assessments, to support NASA management's decision process, and to provide cost analysis results emphasizing "full-cost" and "full-life cycle" considerations. The Agency cost analysis improvement plan has been approved for implementation starting this calendar year. Adequate financial and human resources are being made available to accomplish the goals of this important effort, and all indications are that NASA's cost estimation and analysis core competencies will be substantially improved within the foreseeable future.

  9. Methodology for Calculating Cost-per-Mile for Current and Future Vehicle Powertrain Technologies, with Projections to 2024: Preprint

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ruth, M.; Timbario, T. A.; Timbario, T. J.

    2011-01-01

    Currently, several cost-per-mile calculators exist that can provide estimates of acquisition and operating costs for consumers and fleets. However, these calculators are limited in their ability to determine the difference in cost per mile for consumer versus fleet ownership, to calculate the costs beyond one ownership period, to show the sensitivity of the cost per mile to the annual vehicle miles traveled (VMT), and to estimate future increases in operating and ownership costs. Oftentimes, these tools apply a constant percentage increase over the time period of vehicle operation, or in some cases, no increase in direct costs at all overmore » time. A more accurate cost-per-mile calculator has been developed that allows the user to analyze these costs for both consumers and fleets. The calculator was developed to allow simultaneous comparisons of conventional light-duty internal combustion engine (ICE) vehicles, mild and full hybrid electric vehicles (HEVs), and fuel cell vehicles (FCVs). This paper is a summary of the development by the authors of a more accurate cost-per-mile calculator that allows the user to analyze vehicle acquisition and operating costs for both consumer and fleets. Cost-per-mile results are reported for consumer-operated vehicles travelling 15,000 miles per year and for fleets travelling 25,000 miles per year.« less

  10. Development of a Low-Cost Attitude Sensor for Agricultural Vehicles

    USDA-ARS?s Scientific Manuscript database

    The objective of this research was to develop a low-cost attitude sensor for agricultural vehicles. The attitude sensor was composed of three vibratory gyroscopes and two inclinometers. A sensor fusion algorithm was developed to estimate tilt angles (roll and pitch) by least-squares method. In the a...

  11. Cost calculator methods for estimating casework time in child welfare services: A promising approach for use in implementation of evidence-based practices and other service innovations.

    PubMed

    Holmes, Lisa; Landsverk, John; Ward, Harriet; Rolls-Reutz, Jennifer; Saldana, Lisa; Wulczyn, Fred; Chamberlain, Patricia

    2014-04-01

    Estimating costs in child welfare services is critical as new service models are incorporated into routine practice. This paper describes a unit costing estimation system developed in England (cost calculator) together with a pilot test of its utility in the United States where unit costs are routinely available for health services but not for child welfare services. The cost calculator approach uses a unified conceptual model that focuses on eight core child welfare processes. Comparison of these core processes in England and in four counties in the United States suggests that the underlying child welfare processes generated from England were perceived as very similar by child welfare staff in California county systems with some exceptions in the review and legal processes. Overall, the adaptation of the cost calculator for use in the United States child welfare systems appears promising. The paper also compares the cost calculator approach to the workload approach widely used in the United States and concludes that there are distinct differences between the two approaches with some possible advantages to the use of the cost calculator approach, especially in the use of this method for estimating child welfare costs in relation to the incorporation of evidence-based interventions into routine practice.

  12. Methods for cost estimation in software project management

    NASA Astrophysics Data System (ADS)

    Briciu, C. V.; Filip, I.; Indries, I. I.

    2016-02-01

    The speed in which the processes used in software development field have changed makes it very difficult the task of forecasting the overall costs for a software project. By many researchers, this task has been considered unachievable, but there is a group of scientist for which this task can be solved using the already known mathematical methods (e.g. multiple linear regressions) and the new techniques as genetic programming and neural networks. The paper presents a solution for building a model for the cost estimation models in the software project management using genetic algorithms starting from the PROMISE datasets related COCOMO 81 model. In the first part of the paper, a summary of the major achievements in the research area of finding a model for estimating the overall project costs is presented together with the description of the existing software development process models. In the last part, a basic proposal of a mathematical model of a genetic programming is proposed including here the description of the chosen fitness function and chromosome representation. The perspective of model described it linked with the current reality of the software development considering as basis the software product life cycle and the current challenges and innovations in the software development area. Based on the author's experiences and the analysis of the existing models and product lifecycle it was concluded that estimation models should be adapted with the new technologies and emerging systems and they depend largely by the chosen software development method.

  13. Cost Model Comparison: A Study of Internally and Commercially Developed Cost Models in Use by NASA

    NASA Technical Reports Server (NTRS)

    Gupta, Garima

    2011-01-01

    NASA makes use of numerous cost models to accurately estimate the cost of various components of a mission - hardware, software, mission/ground operations - during the different stages of a mission's lifecycle. The purpose of this project was to survey these models and determine in which respects they are similar and in which they are different. The initial survey included a study of the cost drivers for each model, the form of each model (linear/exponential/other CER, range/point output, capable of risk/sensitivity analysis), and for what types of missions and for what phases of a mission lifecycle each model is capable of estimating cost. The models taken into consideration consisted of both those that were developed by NASA and those that were commercially developed: GSECT, NAFCOM, SCAT, QuickCost, PRICE, and SEER. Once the initial survey was completed, the next step in the project was to compare the cost models' capabilities in terms of Work Breakdown Structure (WBS) elements. This final comparison was then portrayed in a visual manner with Venn diagrams. All of the materials produced in the process of this study were then posted on the Ground Segment Team (GST) Wiki.

  14. Analysis of the influence of advanced materials for aerospace products R&D and manufacturing cost

    NASA Astrophysics Data System (ADS)

    Shen, A. W.; Guo, J. L.; Wang, Z. J.

    2015-12-01

    In this paper, we pointed out the deficiency of traditional cost estimation model about aerospace products Research & Development (R&D) and manufacturing based on analyzing the widely use of advanced materials in aviation products. Then we put up with the estimating formulas of cost factor, which representing the influences of advanced materials on the labor cost rate and manufacturing materials cost rate. The values ranges of the common advanced materials such as composite materials, titanium alloy are present in the labor and materials two aspects. Finally, we estimate the R&D and manufacturing cost of F/A-18, F/A- 22, B-1B and B-2 aircraft based on the common DAPCA IV model and the modified model proposed by this paper. The calculation results show that the calculation precision improved greatly by the proposed method which considering advanced materials. So we can know the proposed method is scientific and reasonable.

  15. Investment Success in Public Health: An Analysis of the Cost-Effectiveness and Cost-Benefit of the Global Programme to Eliminate Lymphatic Filariasis.

    PubMed

    Turner, Hugo C; Bettis, Alison A; Chu, Brian K; McFarland, Deborah A; Hooper, Pamela J; Mante, Sunny D; Fitzpatrick, Christopher; Bradley, Mark H

    2017-03-15

    It has been estimated that $154 million per year will be required during 2015-2020 to continue the Global Programme to Eliminate Lymphatic Filariasis (GPELF). In light of this, it is important to understand the program's current value. Here, we evaluate the cost-effectiveness and cost-benefit of the preventive chemotherapy that was provided under the GPELF between 2000 and 2014. In addition, we also investigate the potential cost-effectiveness of hydrocele surgery. Our economic evaluation of preventive chemotherapy was based on previously published health and economic impact estimates (between 2000 and 2014). The delivery costs of treatment were estimated using a model developed by the World Health Organization. We also developed a model to investigate the number of disability-adjusted life years (DALYs) averted by a hydrocelectomy and identified the cost threshold under which it would be considered cost-effective. The projected cost-effectiveness and cost-benefit of preventive chemotherapy were very promising, and this was robust over a wide range of costs and assumptions. When the economic value of the donated drugs was not included, the GPELF would be classed as highly cost-effective. We projected that a typical hydrocelectomy would be classed as highly cost-effective if the surgery cost less than $66 and cost-effective if less than $398 (based on the World Bank's cost-effectiveness thresholds for low income countries). Both the preventive chemotherapy and hydrocele surgeries provided under the GPELF are incredibly cost-effective and offer a very good investment in public health. © The Author 2016. Published by Oxford University Press for the Infectious Diseases Society of America.

  16. Investment Success in Public Health: An Analysis of the Cost-Effectiveness and Cost-Benefit of the Global Programme to Eliminate Lymphatic Filariasis

    PubMed Central

    Bettis, Alison A.; Chu, Brian K.; McFarland, Deborah A.; Hooper, Pamela J.; Mante, Sunny D.; Fitzpatrick, Christopher; Bradley, Mark H.

    2017-01-01

    Abstract Background. It has been estimated that $154 million per year will be required during 2015–2020 to continue the Global Programme to Eliminate Lymphatic Filariasis (GPELF). In light of this, it is important to understand the program’s current value. Here, we evaluate the cost-effectiveness and cost-benefit of the preventive chemotherapy that was provided under the GPELF between 2000 and 2014. In addition, we also investigate the potential cost-effectiveness of hydrocele surgery. Methods. Our economic evaluation of preventive chemotherapy was based on previously published health and economic impact estimates (between 2000 and 2014). The delivery costs of treatment were estimated using a model developed by the World Health Organization. We also developed a model to investigate the number of disability-adjusted life years (DALYs) averted by a hydrocelectomy and identified the cost threshold under which it would be considered cost-effective. Results. The projected cost-effectiveness and cost-benefit of preventive chemotherapy were very promising, and this was robust over a wide range of costs and assumptions. When the economic value of the donated drugs was not included, the GPELF would be classed as highly cost-effective. We projected that a typical hydrocelectomy would be classed as highly cost-effective if the surgery cost less than $66 and cost-effective if less than $398 (based on the World Bank’s cost-effectiveness thresholds for low income countries). Conclusions. Both the preventive chemotherapy and hydrocele surgeries provided under the GPELF are incredibly cost-effective and offer a very good investment in public health. PMID:27956460

  17. Estimating the Economic Potential of Offshore Wind in the United States

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Beiter, P.; Musial, W.; Smith, A.

    The potential for cost reduction and market deployment for offshore wind varies considerably within the United States. This analysis estimates the future economic viability of offshore wind at more than 7,000 sites under a variety of electric sector and cost reduction scenarios. Identifying the economic potential of offshore wind at a high geospatial resolution can capture the significant variation in local offshore resource quality, costs, and revenue potential. In estimating economic potential, this article applies a method initially developed in Brown et al. (2015) to offshore wind and estimates the sensitivity of results under a variety of most likely electricmore » sector scenarios. For the purposes of this analysis, a theoretical framework is developed introducing a novel offshore resource classification system that is analogous to established resource classifications from the oil and gas sector. Analyzing economic potential within this framework can help establish a refined understanding across industries of the technology and site-specific risks and opportunities associated with future offshore wind development. The results of this analysis are intended to inform the development of the U.S. Department of Energy's offshore wind strategy.« less

  18. Systems design study of the Pioneer Venus spacecraft. Appendices to volume 1, sections 8-11 (part 3 of 3). [power subsystem/cost tradeoffs for Venus probe

    NASA Technical Reports Server (NTRS)

    1973-01-01

    Power subsystem cost/weight tradeoffs are discussed for the Venus probe spacecraft. The cost estimations of power subsystem units were based upon DSCS-2, DSP, and Pioneer 10 and 11 hardware design and development and manufacturing experience. Parts count and degree of modification of existing hardware were factored into the estimate of manufacturing and design and development costs. Cost data includes sufficient quantities of units to equip probe bus and orbiter versions. It was based on the orbiter complement of equipment, but the savings in fewer slices for the probe bus balance the cost of the different probe bus battery. The preferred systems for the Thor/Delta and for the Atlas/Centaur are discussed. The weights of the candidate designs were based upon slice or tray weights for functionally equivalent circuitry measured on existing hardware such as Pioneers 10 and 11, Intelsat 3, DSCS-2, or DSP programs. Battery weights were based on measured cell weight data adjusted for case weight or off-the-shelf battery weights. The solar array weight estimate was based upon recent hardware experience on DSCS-2 and DSP arrays.

  19. Life-Cycle Cost/Benefit Assessment of Expedite Departure Path (EDP)

    NASA Technical Reports Server (NTRS)

    Wang, Jianzhong Jay; Chang, Paul; Datta, Koushik

    2005-01-01

    This report presents a life-cycle cost/benefit assessment (LCCBA) of Expedite Departure Path (EDP), an air traffic control Decision Support Tool (DST) currently under development at NASA. This assessment is an update of a previous study performed by bd Systems, Inc. (bd) during FY01, with the following revisions: The life-cycle cost assessment methodology developed by bd for the previous study was refined and calibrated using Free Flight Phase 1 (FFP1) cost information for Traffic Management Advisor (TMA, or TMA-SC in the FAA's terminology). Adjustments were also made to the site selection and deployment scheduling methodology to include airspace complexity as a factor. This technique was also applied to the benefit extrapolation methodology to better estimate potential benefits for other years, and at other sites. This study employed a new benefit estimating methodology because bd s previous single year potential benefit assessment of EDP used unrealistic assumptions that resulted in optimistic estimates. This methodology uses an air traffic simulation approach to reasonably predict the impacts from the implementation of EDP. The results of the costs and benefits analyses were then integrated into a life-cycle cost/benefit assessment.

  20. 77 FR 52616 - Connect America Fund

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-30

    ... combination of competitive bidding and a forward-looking cost model. The Commission observed that developing a new cost model and bidding mechanism could be expected to take some time. To spur broadband deployment... carriers using a formula to estimate wire center costs that was based on the prior high-cost proxy model. 3...

  1. A bottom-up method to develop pollution abatement cost curves for coal-fired utility boilers

    EPA Science Inventory

    This paper illustrates a new method to create supply curves for pollution abatement using boiler-level data that explicitly accounts for technology costs and performance. The Coal Utility Environmental Cost (CUECost) model is used to estimate retrofit costs for five different NO...

  2. Hospital costs estimation and prediction as a function of patient and admission characteristics.

    PubMed

    Ramiarina, Robert; Almeida, Renan Mvr; Pereira, Wagner Ca

    2008-01-01

    The present work analyzed the association between hospital costs and patient admission characteristics in a general public hospital in the city of Rio de Janeiro, Brazil. The unit costs method was used to estimate inpatient day costs associated to specific hospital clinics. With this aim, three "cost centers" were defined in order to group direct and indirect expenses pertaining to the clinics. After the costs were estimated, a standard linear regression model was developed for correlating cost units and their putative predictors (the patients gender and age, the admission type (urgency/elective), ICU admission (yes/no), blood transfusion (yes/no), the admission outcome (death/no death), the complexity of the medical procedures performed, and a risk-adjustment index). Data were collected for 3100 patients, January 2001-January 2003. Average inpatient costs across clinics ranged from (US$) 1135 [Orthopedics] to 3101 [Cardiology]. Costs increased according to increases in the risk-adjustment index in all clinics, and the index was statistically significant in all clinics except Urology, General surgery, and Clinical medicine. The occupation rate was inversely correlated to costs, and age had no association with costs. The (adjusted) per cent of explained variance varied between 36.3% [Clinical medicine] and 55.1% [Thoracic surgery clinic]. The estimates are an important step towards the standardization of hospital costs calculation, especially for countries that lack formal hospital accounting systems.

  3. Methodological Approaches for Estimating the Benefits and Costs of Smart Grid Demonstration Projects

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lee, Russell

    This report presents a comprehensive framework for estimating the benefits and costs of Smart Grid projects and a step-by-step approach for making these estimates. The framework identifies the basic categories of benefits, the beneficiaries of these benefits, and the Smart Grid functionalities that lead to different benefits and proposes ways to estimate these benefits, including their monetization. The report covers cost-effectiveness evaluation, uncertainty, and issues in estimating baseline conditions against which a project would be compared. The report also suggests metrics suitable for describing principal characteristics of a modern Smart Grid to which a project can contribute. This first sectionmore » of the report presents background information on the motivation for the report and its purpose. Section 2 introduces the methodological framework, focusing on the definition of benefits and a sequential, logical process for estimating them. Beginning with the Smart Grid technologies and functions of a project, it maps these functions to the benefits they produce. Section 3 provides a hypothetical example to illustrate the approach. Section 4 describes each of the 10 steps in the approach. Section 5 covers issues related to estimating benefits of the Smart Grid. Section 6 summarizes the next steps. The methods developed in this study will help improve future estimates - both retrospective and prospective - of the benefits of Smart Grid investments. These benefits, including those to consumers, society in general, and utilities, can then be weighed against the investments. Such methods would be useful in total resource cost tests and in societal versions of such tests. As such, the report will be of interest not only to electric utilities, but also to a broad constituency of stakeholders. Significant aspects of the methodology were used by the U.S. Department of Energy (DOE) to develop its methods for estimating the benefits and costs of its renewable and distributed systems integration demonstration projects as well as its Smart Grid Investment Grant projects and demonstration projects funded under the American Recovery and Reinvestment Act (ARRA). The goal of this report, which was cofunded by the Electric Power Research Institute (EPRI) and DOE, is to present a comprehensive set of methods for estimating the benefits and costs of Smart Grid projects. By publishing this report, EPRI seeks to contribute to the development of methods that will establish the benefits associated with investments in Smart Grid technologies. EPRI does not endorse the contents of this report or make any representations as to the accuracy and appropriateness of its contents. The purpose of this report is to present a methodological framework that will provide a standardized approach for estimating the benefits and costs of Smart Grid demonstration projects. The framework also has broader application to larger projects, such as those funded under the ARRA. Moreover, with additional development, it will provide the means for extrapolating the results of pilots and trials to at-scale investments in Smart Grid technologies. The framework was developed by a panel whose members provided a broad range of expertise.« less

  4. Estimating Teacher Turnover Costs: A Case Study

    ERIC Educational Resources Information Center

    Levy, Abigail Jurist; Joy, Lois; Ellis, Pamela; Jablonski, Erica; Karelitz, Tzur M.

    2012-01-01

    High teacher turnover in large U.S. cities is a critical issue for schools and districts, and the students they serve; but surprisingly little work has been done to develop methodologies and standards that districts and schools can use to make reliable estimates of turnover costs. Even less is known about how to detect variations in turnover costs…

  5. Hydrogen from coal cost estimation guidebook

    NASA Technical Reports Server (NTRS)

    Billings, R. E.

    1981-01-01

    In an effort to establish baseline information whereby specific projects can be evaluated, a current set of parameters which are typical of coal gasification applications was developed. Using these parameters a computer model allows researchers to interrelate cost components in a sensitivity analysis. The results make possible an approximate estimation of hydrogen energy economics from coal, under a variety of circumstances.

  6. A Regression Study of Demand, Cost and Pricing Public Library Circulation Services.

    ERIC Educational Resources Information Center

    Stratton, Peter J.

    This paper examines three aspects of the public library's circulation service: (1) a demand function for the service is estimated; (2) a long-run unit circulation cost curve is developed; and (3) using the economist's notion of "efficiency," a general model for the pricing of the circulation service is presented. The estimated demand…

  7. Planning and Decision Making for Medical Education: An Analysis of Costs and Benefits.

    ERIC Educational Resources Information Center

    Wing, Paul

    This paper clarifies the role of medical education in the large health care system, estimates the resources required to carry on medical education programs and the benefits that accrue from medical education, and answers a few fundamental policy questions. Cost estimates are developed on a program-by-program basis, using empirical economic…

  8. Cost Estimation of Software Development and the Implications for the Program Manager

    DTIC Science & Technology

    1992-06-01

    Software Lifecycle Model (SLIM), the Jensen System-4 model, the Software Productivity, Quality, and Reliability Estimator ( SPQR \\20), the Constructive...function models in current use are the Software Productivity, Quality, and Reliability Estimator ( SPQR /20) and the Software Architecture Sizing and...Estimator ( SPQR /20) was developed by T. Capers Jones of Software Productivity Research, Inc., in 1985. The model is intended to estimate the outcome

  9. The Cost of Ménière's Disease: A Novel Multisource Approach.

    PubMed

    Tyrrell, Jessica; Whinney, David J; Taylor, Timothy

    2016-01-01

    To estimate the annual cost of Ménière's disease and the cost per person in the UK population and to investigate the direct and indirect costs of the condition. The authors utilized a multidata approach to provide the first estimate of the cost of Ménière's. Data from the UK Biobank (a study of 500,000 individuals collected between 2007 and 2012), the Hospital Episode Statistics (data on all hospital admissions in England from 2008 to 2012) and the UK Ménière's Society (2014) were used to estimate the cost of Ménière's. Cases were self-reported in the UK Biobank and UK Ménière's Society, within the Hospital Episode Statistics cases were clinician diagnosed. The authors estimated the direct and indirect costs of the condition, using count data to represent numbers of individuals reporting specific treatments, operations etc. and basic statistical analyses (χ tests, linear and logistic regression) to compare cases and controls in the UK Biobank. Ménière's was estimated to cost between £541.30 million and £608.70 million annually (equivalent to US $829.9 to $934.2 million), equating to £3,341 to £3,757 ($5112 to $5748) per person per annum. The indirect costs were substantial, with loss of earnings contributing to over £400 million per annum. For the first time, the authors were able to estimate the economic burden of Ménière's disease. In the UK, the annual cost of this condition is substantial. Further research is required to develop cost-effective treatments and management strategies for Ménière's to reduce the economic burden of the disease. These findings should be interpreted with caution due to the uncertainties inherent in the analysis.

  10. The Launch Systems Operations Cost Model

    NASA Technical Reports Server (NTRS)

    Prince, Frank A.; Hamaker, Joseph W. (Technical Monitor)

    2001-01-01

    One of NASA's primary missions is to reduce the cost of access to space while simultaneously increasing safety. A key component, and one of the least understood, is the recurring operations and support cost for reusable launch systems. In order to predict these costs, NASA, under the leadership of the Independent Program Assessment Office (IPAO), has commissioned the development of a Launch Systems Operations Cost Model (LSOCM). LSOCM is a tool to predict the operations & support (O&S) cost of new and modified reusable (and partially reusable) launch systems. The requirements are to predict the non-recurring cost for the ground infrastructure and the recurring cost of maintaining that infrastructure, performing vehicle logistics, and performing the O&S actions to return the vehicle to flight. In addition, the model must estimate the time required to cycle the vehicle through all of the ground processing activities. The current version of LSOCM is an amalgamation of existing tools, leveraging our understanding of shuttle operations cost with a means of predicting how the maintenance burden will change as the vehicle becomes more aircraft like. The use of the Conceptual Operations Manpower Estimating Tool/Operations Cost Model (COMET/OCM) provides a solid point of departure based on shuttle and expendable launch vehicle (ELV) experience. The incorporation of the Reliability and Maintainability Analysis Tool (RMAT) as expressed by a set of response surface model equations gives a method for estimating how changing launch system characteristics affects cost and cycle time as compared to today's shuttle system. Plans are being made to improve the model. The development team will be spending the next few months devising a structured methodology that will enable verified and validated algorithms to give accurate cost estimates. To assist in this endeavor the LSOCM team is part of an Agency wide effort to combine resources with other cost and operations professionals to support models, databases, and operations assessments.

  11. Estimating the effect of hospital closure on areawide inpatient hospital costs: a preliminary model and application.

    PubMed Central

    Shepard, D S

    1983-01-01

    A preliminary model is developed for estimating the extent of savings, if any, likely to result from discontinuing a specific inpatient service. By examining the sources of referral to the discontinued service, the model estimates potential demand and how cases will be redistributed among remaining hospitals. This redistribution determines average cost per day in hospitals that receive these cases, relative to average cost per day of the discontinued service. The outflow rate, which measures the proportion of cases not absorbed in other acute care hospitals, is estimated as 30 percent for the average discontinuation. The marginal cost ratio, which relates marginal costs of cases absorbed in surrounding hospitals to the average costs in those hospitals, is estimated as 87 percent in the base case. The model was applied to the discontinuation of all inpatient services in the 75-bed Chelsea Memorial Hospital, near Boston, Massachusetts, using 1976 data. As the precise value of key parameters is uncertain, sensitivity analysis was used to explore a range of values. The most likely result is a small increase ($120,000) in the area's annual inpatient hospital costs, because many patients are referred to more costly teaching hospitals. A similar situation may arise with other urban closures. For service discontinuations to generate savings, recipient hospitals must be low in costs, the outflow rate must be large, and the marginal cost ratio must be low. PMID:6668181

  12. Cost, Energy, and Environmental Impact of Automated Electric Taxi Fleets in Manhattan.

    PubMed

    Bauer, Gordon S; Greenblatt, Jeffery B; Gerke, Brian F

    2018-04-17

    Shared automated electric vehicles (SAEVs) hold great promise for improving transportation access in urban centers while drastically reducing transportation-related energy consumption and air pollution. Using taxi-trip data from New York City, we develop an agent-based model to predict the battery range and charging infrastructure requirements of a fleet of SAEVs operating on Manhattan Island. We also develop a model to estimate the cost and environmental impact of providing service and perform extensive sensitivity analysis to test the robustness of our predictions. We estimate that costs will be lowest with a battery range of 50-90 mi, with either 66 chargers per square mile, rated at 11 kW or 44 chargers per square mile, rated at 22 kW. We estimate that the cost of service provided by such an SAEV fleet will be $0.29-$0.61 per revenue mile, an order of magnitude lower than the cost of service of present-day Manhattan taxis and $0.05-$0.08/mi lower than that of an automated fleet composed of any currently available hybrid or internal combustion engine vehicle (ICEV). We estimate that such an SAEV fleet drawing power from the current NYC power grid would reduce GHG emissions by 73% and energy consumption by 58% compared to an automated fleet of ICEVs.

  13. Nonlinear Dynamic Model-Based Multiobjective Sensor Network Design Algorithm for a Plant with an Estimator-Based Control System

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Paul, Prokash; Bhattacharyya, Debangsu; Turton, Richard

    Here, a novel sensor network design (SND) algorithm is developed for maximizing process efficiency while minimizing sensor network cost for a nonlinear dynamic process with an estimator-based control system. The multiobjective optimization problem is solved following a lexicographic approach where the process efficiency is maximized first followed by minimization of the sensor network cost. The partial net present value, which combines the capital cost due to the sensor network and the operating cost due to deviation from the optimal efficiency, is proposed as an alternative objective. The unscented Kalman filter is considered as the nonlinear estimator. The large-scale combinatorial optimizationmore » problem is solved using a genetic algorithm. The developed SND algorithm is applied to an acid gas removal (AGR) unit as part of an integrated gasification combined cycle (IGCC) power plant with CO 2 capture. Due to the computational expense, a reduced order nonlinear model of the AGR process is identified and parallel computation is performed during implementation.« less

  14. Nonlinear Dynamic Model-Based Multiobjective Sensor Network Design Algorithm for a Plant with an Estimator-Based Control System

    DOE PAGES

    Paul, Prokash; Bhattacharyya, Debangsu; Turton, Richard; ...

    2017-06-06

    Here, a novel sensor network design (SND) algorithm is developed for maximizing process efficiency while minimizing sensor network cost for a nonlinear dynamic process with an estimator-based control system. The multiobjective optimization problem is solved following a lexicographic approach where the process efficiency is maximized first followed by minimization of the sensor network cost. The partial net present value, which combines the capital cost due to the sensor network and the operating cost due to deviation from the optimal efficiency, is proposed as an alternative objective. The unscented Kalman filter is considered as the nonlinear estimator. The large-scale combinatorial optimizationmore » problem is solved using a genetic algorithm. The developed SND algorithm is applied to an acid gas removal (AGR) unit as part of an integrated gasification combined cycle (IGCC) power plant with CO 2 capture. Due to the computational expense, a reduced order nonlinear model of the AGR process is identified and parallel computation is performed during implementation.« less

  15. The importance of operations, risk, and cost assessment to space transfer systems design

    NASA Technical Reports Server (NTRS)

    Ball, J. M.; Komerska, R. J.; Rowell, L. F.

    1992-01-01

    This paper examines several methodologies which contribute to comprehensive subsystem cost estimation. The example of a space-based lunar space transfer vehicle (STV) design is used to illustrate how including both primary and secondary factors into cost affects the decision of whether to use aerobraking or propulsion for earth orbit capture upon lunar return. The expected dominant cost factor in this decision is earth-to-orbit launch cost driven by STV mass. However, to quantify other significant cost factors, this cost comparison included a risk analysis to identify development and testing costs, a Taguchi design of experiments to determine a minimum mass aerobrake design, and a detailed operations analysis. As a result, the predicted cost advantage of aerobraking, while still positive, was subsequently reduced by about 30 percent compared to the simpler mass-based cost estimates.

  16. DEVELOPMENT OF A METHOD TO DESIGN A LOW-CARBON SOCIETY IN SMALL COMMUNITY AND ITS APPLICATION TO PUTRAJAYA, MALAYSIA

    NASA Astrophysics Data System (ADS)

    Hayashi, Yuri; Simson, Janice. J.; Gomi, Kei; Matsuoka, Yuzuru

    In this study, we developed the method to design Low-carbon society for small communities almost without industry, with regarding of costs for countermeasures. Then we applied it to Putrajaya, Malaysia, and estimate Socio-economic indicators, energy demand, CO2 emission in year 2007 and 2025. For countermeasure case in 2025, we set three cases according to their priority; Transport, Renewable energy, Building, and calculated costs for countermeasures also. As a result, it was shown that it is possible to reduce 45% of CO2 emission by 2025 compared to 2007 level. Renewable energy priority case needs the highest cost, and Building and Transport was estimated to be the second and third highest. C-ExSS will help more realistic discussion on the policy and countermeasures for developing low-carbon society based on their costs.

  17. National Stormwater Calculator: Low Impact Development Stormwater Control Cost Estimation Programming & Future Enhancements - Presentation

    EPA Science Inventory

    The National Stormwater Calculator (NSC) makes it easy to estimate runoff reduction when planning a new development or redevelopment site with low impact development (LID) stormwater controls. The Calculator is currently deployed as a Windows desktop application. The NSC is organ...

  18. National Stormwater Calculator: Low Impact Development Stormwater Control Cost Estimation Programming & Future Enhancements - abstract

    EPA Science Inventory

    The National Stormwater Calculator (NSC) makes it easy to estimate runoff reduction when planning a new development or redevelopment site with low impact development (LID) stormwater controls. The Calculator is currently deployed as a Windows desktop application. The Calculator i...

  19. Cost of heat from a seasonal source

    NASA Astrophysics Data System (ADS)

    Reilly, R. W.; Brown, D. R.; Huber, H. D.

    Results are reported of an investigation to estimate the cost of aquifer thermal energy storage (ATES) from a seasonal heat source. The cost of supplying energy (hot water) from an ATES system is estimated. Three types of loads are investigated: point demands, residential developments, and a multidistrict city. Several technical and economic factors are found to control the economic performance of an ATES system. Costs are found to be prohibitive for systems of small size, long transmission distances, and employing expensive purchased thermal energy. ATES is found to be cost-competitive with oil-fired and electric hot water delivery systems under a broad range of potential situations.

  20. Costs of fire suppression forces based on cost-aggregation approach

    Treesearch

    Gonz& aacute; lez-Cab& aacute; Armando n; Charles W. McKetta; Thomas J. Mills

    1984-01-01

    A cost-aggregation approach has been developed for determining the cost of Fire Management Inputs (FMls)-the direct fireline production units (personnel and equipment) used in initial attack and large-fire suppression activities. All components contributing to an FMI are identified, computed, and summed to estimate hourly costs. This approach can be applied to any FMI...

  1. Guided Multiple Launch Rocket System/Guided Multiple Launch Rocket System Alternative Warhead (GMLRS/GMLRS AW)

    DTIC Science & Technology

    2015-12-01

    Physical Configuration Audit for the GMLRS AW was completed at the system level in March 2015. ​Director of Operational Test and Evaluation Assessment...Confidence Level Confidence Level of cost estimate for current APB: 50% The confidence level used in establishing the cost estimate for GMLRS/GMLRS AW...PAUC Development Estimate Changes PAUC Production Estimate Econ Qty Sch Eng Est Oth Spt Total 0.039 -0.003 0.001 0.001 0.009 0.037 0.000 0.000 0.045

  2. Costs of providing infusion therapy for patients with inflammatory bowel disease in a hospital-based infusion center setting.

    PubMed

    Afzali, Anita; Ogden, Kristine; Friedman, Michael L; Chao, Jingdong; Wang, Anthony

    2017-04-01

    Inflammatory bowel disease (IBD) (e.g. ulcerative colitis [UC] and Crohn's disease [CD]) severely impacts patient quality-of-life. Moderate-to-severe disease is often treated with biologics requiring infusion therapy, adding incremental costs beyond drug costs. This study evaluates US hospital-based infusion services costs for treatment of UC or CD patients receiving infliximab or vedolizumab therapy. A model was developed, estimating annual costs of providing monitored infusions using an activity-based costing framework approach. Multiple sources (published literature, treatment product inserts) informed base-case model input estimates. The total modeled per patient infusion therapy costs in Year 1 with infliximab and vedolizumab was $38,782 and $41,320, respectively, and Year 2+, $49,897 and $36,197, respectively. Drug acquisition cost was the largest total costs driver (90-93%), followed by costs associated with hospital-based infusion provision: labor (53-56%, non-drug costs), allocated overhead (23%, non-drug costs), non-labor (23%, non-drug costs), and laboratory (7-10%, non-drug costs). Limitations included reliance on published estimates, base-case cost estimates infusion drug, and supplies, not accounting for volume pricing, assumption of a small hospital infusion center, and that, given the model adopts the hospital perspective, costs to the patient were not included in infusion administration cost base-case estimates. This model is an early step towards a framework to fully analyze infusion therapies' associated costs. Given the lack of published data, it would be beneficial for hospital administrators to assess total costs and trade-offs with alternative means of providing biologic therapies. This analysis highlights the value to hospital administrators of assessing cost associated with infusion patient mix to make more informed resource allocation decisions. As the landscape for reimbursement changes, tools for evaluating the costs of infusion therapy may help hospital administrators make informed choices and weigh trade-offs associated with providing infusion services for IBD patients.

  3. Weight and the Future of Space Flight Hardware Cost Modeling

    NASA Technical Reports Server (NTRS)

    Prince, Frank A.

    2003-01-01

    Weight has been used as the primary input variable for cost estimating almost as long as there have been parametric cost models. While there are good reasons for using weight, serious limitations exist. These limitations have been addressed by multi-variable equations and trend analysis in models such as NAFCOM, PRICE, and SEER; however, these models have not be able to address the significant time lags that can occur between the development of similar space flight hardware systems. These time lags make the cost analyst's job difficult because insufficient data exists to perform trend analysis, and the current set of parametric models are not well suited to accommodating process improvements in space flight hardware design, development, build and test. As a result, people of good faith can have serious disagreement over the cost for new systems. To address these shortcomings, new cost modeling approaches are needed. The most promising approach is process based (sometimes called activity) costing. Developing process based models will require a detailed understanding of the functions required to produce space flight hardware combined with innovative approaches to estimating the necessary resources. Particularly challenging will be the lack of data at the process level. One method for developing a model is to combine notional algorithms with a discrete event simulation and model changes to the total cost as perturbations to the program are introduced. Despite these challenges, the potential benefits are such that efforts should be focused on developing process based cost models.

  4. Incremental costs associated with myocardial infarction and stroke in patients with type 2 diabetes mellitus: an overview for economic modeling.

    PubMed

    Brennan, Victoria K; Colosia, Ann D; Copley-Merriman, Catherine; Mauskopf, Josephine; Hass, Bastian; Palencia, Roberto

    2014-07-01

    To identify cost estimates related to myocardial infarction (MI) or stroke in patients with type 2 diabetes mellitus (T2DM) for use in economic models. A systematic literature review was conducted. Electronic databases and conference abstracts were screened against inclusion criteria, which included studies performed in patients who had T2DM before experiencing an MI or stroke. Primary cost studies and economic models were included. Costs were converted to 2012 pounds sterling. Fifty-four studies were identified: 13 primary cost studies and 41 economic evaluations using secondary sources for complication costs. Primary studies provided costs from 10 countries. Estimates for a fatal event ranged from £2482-£5222 for MI and from £4900-£6694 for stroke. Costs for the year a non-fatal event occurred ranged from £5071-£29,249 for MI and from £5171-£38,732 for stroke. Annual follow-up costs ranged from £945-£1616 for an MI and from £4704-£12,926 for a stroke. Economic evaluations from 12 countries were identified, and costs of complications showed similar variability to the primary studies. The costs identified within primary studies varied between and within countries. Many studies used costs estimated in studies not specific to patients with T2DM. Data gaps included a detailed breakdown of resource use, which affected the ability to compare data across countries. In the development of economic models for patients with T2DM, the use of accurate estimates of costs associated with MI and stroke is important. When country-specific costs are not available, clear justification for the choice of estimates should be provided.

  5. Innovation in health economic modelling of service improvements for longer-term depression: demonstration in a local health community.

    PubMed

    Tosh, Jonathan; Kearns, Ben; Brennan, Alan; Parry, Glenys; Ricketts, Thomas; Saxon, David; Kilgarriff-Foster, Alexis; Thake, Anna; Chambers, Eleni; Hutten, Rebecca

    2013-04-26

    The purpose of the analysis was to develop a health economic model to estimate the costs and health benefits of alternative National Health Service (NHS) service configurations for people with longer-term depression. Modelling methods were used to develop a conceptual and health economic model of the current configuration of services in Sheffield, England for people with longer-term depression. Data and assumptions were synthesised to estimate cost per Quality Adjusted Life Years (QALYs). Three service changes were developed and resulted in increased QALYs at increased cost. Versus current care, the incremental cost-effectiveness ratio (ICER) for a self-referral service was £11,378 per QALY. The ICER was £2,227 per QALY for the dropout reduction service and £223 per QALY for an increase in non-therapy services. These results were robust when compared to current cost-effectiveness thresholds and accounting for uncertainty. Cost-effective service improvements for longer-term depression have been identified. Also identified were limitations of the current evidence for the long term impact of services.

  6. Cost studies for commercial fuselage crown designs

    NASA Technical Reports Server (NTRS)

    Walker, T. H.; Smith, P. J.; Truslove, G.; Willden, K. S.; Metschan, S. L.; Pfahl, C. L.

    1991-01-01

    Studies were conducted to evaluate the cost and weight potential of advanced composite design concepts in the crown region of a commercial transport. Two designs from each of three design families were developed using an integrated design-build team. A range of design concepts and manufacturing processes were included to allow isolation and comparison of cost centers. Detailed manufacturing/assembly plans were developed as the basis for cost estimates. Each of the six designs was found to have advantages over the 1995 aluminum benchmark in cost and weight trade studies. Large quadrant panels and cobonded frames were found to save significant assembly labor costs. Comparisons of high- and intermediate-performance fiber systems were made for skin and stringer applications. Advanced tow placement was found to be an efficient process for skin lay up. Further analysis revealed attractive processes for stringers and frames. Optimized designs were informally developed for each design family, combining the most attractive concepts and processes within that family. A single optimized design was selected as the most promising, and the potential for further optimization was estimated. Technical issues and barriers were identified.

  7. Analysis and Approach to the Development of an Advanced Multimedia Instructional System. Volume II. Appendix III. Media Cost Data. Final Report.

    ERIC Educational Resources Information Center

    Rhode, William E.; And Others

    Basic cost estimates for selected instructional media are tabled in this document, Part II (Appendix III) of the report "Analysis and Approach to the Development of an Advanced Multimedia Instructional System" by William E. Rhode and others. Learning materials production costs are given for motion pictures, still visuals, videotapes, live…

  8. Development of a cost-effective machine vision system for in-field sorting and grading of apples: Fruit orientation and size estimation

    USDA-ARS?s Scientific Manuscript database

    The objective of this research was to develop an in-field apple presorting and grading system to separate undersized and defective fruit from fresh market-grade apples. To achieve this goal, a cost-effective machine vision inspection prototype was built, which consisted of a low-cost color camera, L...

  9. SOFTCOST - DEEP SPACE NETWORK SOFTWARE COST MODEL

    NASA Technical Reports Server (NTRS)

    Tausworthe, R. C.

    1994-01-01

    The early-on estimation of required resources and a schedule for the development and maintenance of software is usually the least precise aspect of the software life cycle. However, it is desirable to make some sort of an orderly and rational attempt at estimation in order to plan and organize an implementation effort. The Software Cost Estimation Model program, SOFTCOST, was developed to provide a consistent automated resource and schedule model which is more formalized than the often used guesswork model based on experience, intuition, and luck. SOFTCOST was developed after the evaluation of a number of existing cost estimation programs indicated that there was a need for a cost estimation program with a wide range of application and adaptability to diverse kinds of software. SOFTCOST combines several software cost models found in the open literature into one comprehensive set of algorithms that compensate for nearly fifty implementation factors relative to size of the task, inherited baseline, organizational and system environment, and difficulty of the task. SOFTCOST produces mean and variance estimates of software size, implementation productivity, recommended staff level, probable duration, amount of computer resources required, and amount and cost of software documentation. Since the confidence level for a project using mean estimates is small, the user is given the opportunity to enter risk-biased values for effort, duration, and staffing, to achieve higher confidence levels. SOFTCOST then produces a PERT/CPM file with subtask efforts, durations, and precedences defined so as to produce the Work Breakdown Structure (WBS) and schedule having the asked-for overall effort and duration. The SOFTCOST program operates in an interactive environment prompting the user for all of the required input. The program builds the supporting PERT data base in a file for later report generation or revision. The PERT schedule and the WBS schedule may be printed and stored in a file for later use. The SOFTCOST program is written in Microsoft BASIC for interactive execution and has been implemented on an IBM PC-XT/AT operating MS-DOS 2.1 or higher with 256K bytes of memory. SOFTCOST was originally developed for the Zylog Z80 system running under CP/M in 1981. It was converted to run on the IBM PC XT/AT in 1986. SOFTCOST is a copyrighted work with all copyright vested in NASA.

  10. Social cost impact assessment of pipeline infrastructure projects

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Matthews, John C., E-mail: matthewsj@battelle.org; Allouche, Erez N., E-mail: allouche@latech.edu; Sterling, Raymond L., E-mail: sterling@latech.edu

    A key advantage of trenchless construction methods compared with traditional open-cut methods is their ability to install or rehabilitate underground utility systems with limited disruption to the surrounding built and natural environments. The equivalent monetary values of these disruptions are commonly called social costs. Social costs are often ignored by engineers or project managers during project planning and design phases, partially because they cannot be calculated using standard estimating methods. In recent years some approaches for estimating social costs were presented. Nevertheless, the cost data needed for validation of these estimating methods is lacking. Development of such social cost databasesmore » can be accomplished by compiling relevant information reported in various case histories. This paper identifies eight most important social cost categories, presents mathematical methods for calculating them, and summarizes the social cost impacts for two pipeline construction projects. The case histories are analyzed in order to identify trends for the various social cost categories. The effectiveness of the methods used to estimate these values is also discussed. These findings are valuable for pipeline infrastructure engineers making renewal technology selection decisions by providing a more accurate process for the assessment of social costs and impacts. - Highlights: • Identified the eight most important social cost factors for pipeline construction • Presented mathematical methods for calculating those social cost factors • Summarized social cost impacts for two pipeline construction projects • Analyzed those projects to identify trends for the social cost factors.« less

  11. Application of an Original Wildfire Smoke Health Cost Benefits Transfer Protocol to the Western US, 2005-2015

    NASA Astrophysics Data System (ADS)

    Jones, Benjamin A.; Berrens, Robert P.

    2017-11-01

    Recent growth in the frequency and severity of US wildfires has led to more wildfire smoke and increased public exposure to harmful air pollutants. Populations exposed to wildfire smoke experience a variety of negative health impacts, imposing economic costs on society. However, few estimates of smoke health costs exist and none for the entire Western US, in particular, which experiences some of the largest and most intense wildfires in the US. The lack of cost estimates is troublesome because smoke health impacts are an important consideration of the overall costs of wildfire. To address this gap, this study provides the first time series estimates of PM2.5 smoke costs across mortality and several morbidity measures for the Western US over 2005-2015. This time period includes smoke from several megafires and includes years of record-breaking acres burned. Smoke costs are estimated using a benefits transfer protocol developed for contexts when original health data are not available. The novelty of our protocol is that it synthesizes the literature on choices faced by researchers when conducting a smoke cost benefit transfer. On average, wildfire smoke in the Western US creates 165 million in annual morbidity and mortality health costs.

  12. Application of an Original Wildfire Smoke Health Cost Benefits Transfer Protocol to the Western US, 2005-2015.

    PubMed

    Jones, Benjamin A; Berrens, Robert P

    2017-11-01

    Recent growth in the frequency and severity of US wildfires has led to more wildfire smoke and increased public exposure to harmful air pollutants. Populations exposed to wildfire smoke experience a variety of negative health impacts, imposing economic costs on society. However, few estimates of smoke health costs exist and none for the entire Western US, in particular, which experiences some of the largest and most intense wildfires in the US. The lack of cost estimates is troublesome because smoke health impacts are an important consideration of the overall costs of wildfire. To address this gap, this study provides the first time series estimates of PM2.5 smoke costs across mortality and several morbidity measures for the Western US over 2005-2015. This time period includes smoke from several megafires and includes years of record-breaking acres burned. Smoke costs are estimated using a benefits transfer protocol developed for contexts when original health data are not available. The novelty of our protocol is that it synthesizes the literature on choices faced by researchers when conducting a smoke cost benefit transfer. On average, wildfire smoke in the Western US creates $165 million in annual morbidity and mortality health costs.

  13. Productivity costs in economic evaluations: past, present, future.

    PubMed

    Krol, Marieke; Brouwer, Werner; Rutten, Frans

    2013-07-01

    Productivity costs occur when the productivity of individuals is affected by illness, treatment, disability or premature death. The objective of this paper was to review past and current developments related to the inclusion, identification, measurement and valuation of productivity costs in economic evaluations. The main debates in the theory and practice of economic evaluations of health technologies described in this review have centred on the questions of whether and how to include productivity costs, especially productivity costs related to paid work. The past few decades have seen important progress in this area. There are important sources of productivity costs other than absenteeism (e.g. presenteeism and multiplier effects in co-workers), but their exact influence on costs remains unclear. Different measurement instruments have been developed over the years, but which instrument provides the most accurate estimates has not been established. Several valuation approaches have been proposed. While empirical research suggests that productivity costs are best included in the cost side of the cost-effectiveness ratio, the jury is still out regarding whether the human capital approach or the friction cost approach is the most appropriate valuation method to do so. Despite the progress and the substantial amount of scientific research, a consensus has not been reached on either the inclusion of productivity costs in economic evaluations or the methods used to produce productivity cost estimates. Such a lack of consensus has likely contributed to ignoring productivity costs in actual economic evaluations and is reflected in variations in national health economic guidelines. Further research is needed to lessen the controversy regarding the estimation of health-related productivity costs. More standardization would increase the comparability and credibility of economic evaluations taking a societal perspective.

  14. Cost effectiveness of recombinant activated factor VII for the control of bleeding in patients with severe blunt trauma injuries in the United Kingdom.

    PubMed

    Morris, S; Ridley, S; Munro, V; Christensen, M C

    2007-01-01

    The aim of this study was to assess the lifetime cost effectiveness of recombinant activated factor VII vs placebo as adjunctive therapy for control of bleeding in patients with severe blunt trauma in the UK. We developed a cost-effectiveness model based on patient level data from a 30-day international, randomised, placebo-controlled Phase II trial. The data were supplemented with secondary data from UK sources to estimate lifetime costs and benefits. The model produced a baseline estimate of the incremental cost per life year gained with recombinant activated factor VII relative to placebo of 12 613 UK pounds. The incremental cost per quality adjusted life year gained was 18 825 UK pounds. These estimates are sensitive to the choice of discount rate and health state utility values used. Preliminary results suggest that relative to placebo, recombinant activated factor VII may be a cost-effective therapy to the UK National Health Service.

  15. From strategy development to routine implementation: the cost of Intermittent Preventive Treatment in Infants for malaria control

    PubMed Central

    Manzi, Fatuma; Hutton, Guy; Schellenberg, Joanna; Tanner, Marcel; Alonso, Pedro; Mshinda, Hassan; Schellenberg, David

    2008-01-01

    Background Achieving the Millennium Development Goals for health requires a massive scaling-up of interventions in Sub Saharan Africa. Intermittent Preventive Treatment in infants (IPTi) is a promising new tool for malaria control. Although efficacy information is available for many interventions, there is a dearth of data on the resources required for scaling up of health interventions. Method We worked in partnership with the Ministry of Health and Social Welfare (MoHSW) to develop an IPTi strategy that could be implemented and managed by routine health services. We tracked health system and other costs of (1) developing the strategy and (2) maintaining routine implementation of the strategy in five districts in southern Tanzania. Financial costs were extracted and summarized from a costing template and semi-structured interviews were conducted with key informants to record time and resources spent on IPTi activities. Results The estimated financial cost to start-up and run IPTi in the whole of Tanzania in 2005 was US$1,486,284. Start-up costs of US$36,363 were incurred at the national level, mainly on the development of Behaviour Change Communication (BCC) materials, stakeholders' meetings and other consultations. The annual running cost at national level for intervention management and monitoring and drug purchase was estimated at US$459,096. Start-up costs at the district level were US$7,885 per district, mainly expenditure on training. Annual running costs were US$170 per district, mainly for printing of BCC materials. There was no incremental financial expenditure needed to deliver the intervention in health facilities as supplies were delivered alongside routine vaccinations and available health workers performed the activities without working overtime. The economic cost was estimated at 23 US cents per IPTi dose delivered. Conclusion The costs presented here show the order of magnitude of expenditures needed to initiate and to implement IPTi at national scale in settings with high Expanded Programme on Immunization (EPI) coverage. The IPTi intervention appears to be affordable even within the budget constraints of Ministries of Health of most sub-Saharan African countries. PMID:18671874

  16. 7 CFR 761.10 - Planning and performing construction and other development.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... the Agency with an estimate of the total cash cost of all planned development prior to loan approval; (2) Must show proof of sufficient funds to pay for the total cash cost of all planned development at... regulations, including building, plumbing, mechanical, electrical, water, and waste management. (4) The Agency...

  17. A Leo Satellite Navigation Algorithm Based on GPS and Magnetometer Data

    NASA Technical Reports Server (NTRS)

    Deutschmann, Julie; Harman, Rick; Bar-Itzhack, Itzhack

    2001-01-01

    The Global Positioning System (GPS) has become a standard method for low cost onboard satellite orbit determination. The use of a GPS receiver as an attitude and rate sensor has also been developed in the recent past. Additionally, focus has been given to attitude and orbit estimation using the magnetometer, a low cost, reliable sensor. Combining measurements from both GPS and a magnetometer can provide a robust navigation system that takes advantage of the estimation qualities of both measurements. Ultimately, a low cost, accurate navigation system can result, potentially eliminating the need for more costly sensors, including gyroscopes. This work presents the development of a technique to eliminate numerical differentiation of the GPS phase measurements and also compares the use of one versus two GPS satellites.

  18. Lead Coolant Test Facility Systems Design, Thermal Hydraulic Analysis and Cost Estimate

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Soli Khericha; Edwin Harvego; John Svoboda

    2012-01-01

    The Idaho National Laboratory prepared a preliminary technical and functional requirements (T&FR), thermal hydraulic design and cost estimate for a lead coolant test facility. The purpose of this small scale facility is to simulate lead coolant fast reactor (LFR) coolant flow in an open lattice geometry core using seven electrical rods and liquid lead or lead-bismuth eutectic coolant. Based on review of current world lead or lead-bismuth test facilities and research needs listed in the Generation IV Roadmap, five broad areas of requirements were identified as listed: (1) Develop and Demonstrate Feasibility of Submerged Heat Exchanger; (2) Develop and Demonstratemore » Open-lattice Flow in Electrically Heated Core; (3) Develop and Demonstrate Chemistry Control; (4) Demonstrate Safe Operation; and (5) Provision for Future Testing. This paper discusses the preliminary design of systems, thermal hydraulic analysis, and simplified cost estimate. The facility thermal hydraulic design is based on the maximum simulated core power using seven electrical heater rods of 420 kW; average linear heat generation rate of 300 W/cm. The core inlet temperature for liquid lead or Pb/Bi eutectic is 4200 C. The design includes approximately seventy-five data measurements such as pressure, temperature, and flow rates. The preliminary estimated cost of construction of the facility is $3.7M (in 2006 $). It is also estimated that the facility will require two years to be constructed and ready for operation.« less

  19. Limitations and opportunities for the social cost of carbon (Invited)

    NASA Astrophysics Data System (ADS)

    Rose, S. K.

    2010-12-01

    Estimates of the marginal value of carbon dioxide-the social cost of carbon (SCC)-were recently adopted by the U.S. Government in order to satisfy requirements to value estimated GHG changes of new federal regulations. However, the development and use of SCC estimates of avoided climate change impacts comes with significant challenges and controversial decisions. Fortunately, economics can provide some guidance for conceptually appropriate estimates. At the same time, economics defaults to a benefit-cost decision framework to identify socially optimal policies. However, not all current policy decisions are benefit-cost based, nor depend on monetized information, or even have the same threshold for information. While a conceptually appropriate SCC is a useful metric, how far can we take it? This talk discusses potential applications of the SCC, limitations based on the state of research and methods, as well as opportunities for among other things consistency with climate risk management and research and decision-making tools.

  20. Developing a realistic-prototyping road user cost evaluation tool for FDOT.

    DOT National Transportation Integrated Search

    2008-12-31

    The objective of this project is to develop a realistic-prototyping RUC (Road User Cost) calculation tool that is userfriendly : and utilizing limited number of data inputs that are easy to use. The tool can help engineers to estimate RUC on : specif...

  1. 48 CFR 970.1504-1-7 - Fee base.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Development, or Environmental Management work to be performed. Special equipment purchases shall be addressed... represents the cost of the Production, Research and Development, or Environmental Management work to be... part of the estimated cost of capital equipment (other than special equipment) which the contractor...

  2. Congestion Mitigation and Air Quality (CMAQ) Improvement Program: Cost-Effectiveness Tables Development and Methodology

    DOT National Transportation Integrated Search

    2015-05-01

    This document presents summary and detailed findings from a research effort to develop estimates of the cost-effectiveness of a range of project types funded under the Congestion Mitigation and Air Quality (CMAQ) Improvement Program. In this study, c...

  3. Assessing the costs attributed to project delay during project pre-construction stages

    DOT National Transportation Integrated Search

    2016-03-01

    This project for the Texas Department of Transportation (TxDOT) developed a simple but sound : methodology for estimating the cost of delaying most types of highway projects. Researchers considered the : cost of delays during the pre-construction pha...

  4. Assessing the costs attributed to project delay during project pre-construction stages.

    DOT National Transportation Integrated Search

    2016-03-01

    This project for the Texas Department of Transportation (TxDOT) developed a simple but sound : methodology for estimating the cost of delaying most types of highway projects. Researchers considered the : cost of delays during the pre-construction pha...

  5. COAL UTILITY EVIRONMENTAL COST (CUECOST) WORKBOOK USER'S MANUAL

    EPA Science Inventory

    The document is a user's manual for the Coal Utility Environmental Cost (CUECost) workbook (an interrelated set of spreadsheets) and documents its development and the validity of methods used to estimate installed capital ad annualize costs. The CUECost workbook produces rough-or...

  6. Modeling of Control Costs, Emissions, and Control Retrofits for Cost Effectiveness and Feasibility Analyses

    EPA Pesticide Factsheets

    Learn about EPA’s use of the Integrated Planning Model (IPM) to develop estimates of SO2 and NOx emission control costs, projections of futureemissions, and projections of capacity of future control retrofits, assuming controls on EGUs.

  7. The cost of long-term follow-up of high-risk infants for research studies.

    PubMed

    Doyle, Lex W; Clucas, Luisa; Roberts, Gehan; Davis, Noni; Duff, Julianne; Callanan, Catherine; McDonald, Marion; Anderson, Peter J; Cheong, Jeanie L Y

    2015-10-01

    Neonatal intensive care is expensive, and thus it is essential that its long-term outcomes are measured. The costs of follow-up studies for high-risk children who survive are unknown. This study aims to determine current costs for the assessment of health and development of children followed up in our research programme. Costs were determined for children involved in the research follow-up programme at the Royal Women's Hospital, Melbourne, over the 6-month period between 1st January 2012 and 30th June 2012. The time required for health professionals involved in assessments in early and later childhood was estimated, and converted into dollar costs. Costs for equipment and data management were added. Estimated costs were compared with actual costs of running the research follow-up programme. A total of 134 children were assessed over the 6-month period. The estimated average cost per child assessed was $1184, much higher than was expected. The estimated cost to assess a toddler was $1149, whereas for an 11-year-old it was $1443, the difference attributable to the longer psychological and paediatric assessments. The actual average cost per child assessed was $1623. The shortfall of $439 between the actual and estimated average costs per child arose chiefly because of the need to pay staff even when participants were late or failed to attend. The average costs of assessing children at each age for research studies are much higher than expected. These data are useful for planning similar long-term follow-up assessments for high-risk children. © 2015 The Authors. Journal of Paediatrics and Child Health © 2015 Paediatrics and Child Health Division (Royal Australasian College of Physicians).

  8. A LEO Satellite Navigation Algorithm Based on GPS and Magnetometer Data

    NASA Technical Reports Server (NTRS)

    Deutschmann, Julie; Bar-Itzhack, Itzhack; Harman, Rick; Bauer, Frank H. (Technical Monitor)

    2000-01-01

    The Global Positioning System (GPS) has become a standard method for low cost onboard satellite orbit determination. The use of a GPS receiver as an attitude and rate sensor has also been developed in the recent past. Additionally, focus has been given to attitude and orbit estimation using the magnetometer, a low cost, reliable sensor. Combining measurements from both GPS and a magnetometer can provide a robust navigation system that takes advantage of the estimation qualities of both measurements. Ultimately a low cost, accurate navigation system can result, potentially eliminating the need for more costly sensors, including gyroscopes.

  9. Global mortality consequences of climate change accounting for adaptation costs and benefits

    NASA Astrophysics Data System (ADS)

    Rising, J. A.; Jina, A.; Carleton, T.; Hsiang, S. M.; Greenstone, M.

    2017-12-01

    Empirically-based and plausibly causal estimates of the damages of climate change are greatly needed to inform rapidly developing global and local climate policies. To accurately reflect the costs of climate change, it is essential to estimate how much populations will adapt to a changing climate, yet adaptation remains one of the least understood aspects of social responses to climate. In this paper, we develop and implement a novel methodology to estimate climate impacts on mortality rates. We assemble comprehensive sub-national panel data in 41 countries that account for 56% of the world's population, and combine them with high resolution daily climate data to flexibly estimate the causal effect of temperature on mortality. We find the impacts of temperature on mortality have a U-shaped response; both hot days and cold days cause excess mortality. However, this average response obscures substantial heterogeneity, as populations are differentially adapted to extreme temperatures. Our empirical model allows us to extrapolate response functions across the entire globe, as well as across time, using a range of economic, population, and climate change scenarios. We also develop a methodology to capture not only the benefits of adaptation, but also its costs. We combine these innovations to produce the first causal, micro-founded, global, empirically-derived climate damage function for human health. We project that by 2100, business-as-usual climate change is likely to incur mortality-only costs that amount to approximately 5% of global GDP for 5°C degrees of warming above pre-industrial levels. On average across model runs, we estimate that the upper bound on adaptation costs amounts to 55% of the total damages.

  10. Estimating productivity costs using the friction cost approach in practice: a systematic review.

    PubMed

    Kigozi, Jesse; Jowett, Sue; Lewis, Martyn; Barton, Pelham; Coast, Joanna

    2016-01-01

    The choice of the most appropriate approach to valuing productivity loss has received much debate in the literature. The friction cost approach has been proposed as a more appropriate alternative to the human capital approach when valuing productivity loss, although its application remains limited. This study reviews application of the friction cost approach in health economic studies and examines how its use varies in practice across different country settings. A systematic review was performed to identify economic evaluation studies that have estimated productivity costs using the friction cost approach and published in English from 1996 to 2013. A standard template was developed and used to extract information from studies meeting the inclusion criteria. The search yielded 46 studies from 12 countries. Of these, 28 were from the Netherlands. Thirty-five studies reported the length of friction period used, with only 16 stating explicitly the source of the friction period. Nine studies reported the elasticity correction factor used. The reported friction cost approach methods used to derive productivity costs varied in quality across studies from different countries. Few health economic studies have estimated productivity costs using the friction cost approach. The estimation and reporting of productivity costs using this method appears to differ in quality by country. The review reveals gaps and lack of clarity in reporting of methods for friction cost evaluation. Generating reporting guidelines and country-specific parameters for the friction cost approach is recommended if increased application and accuracy of the method is to be realized.

  11. Forecasting the impact of heart failure in the United States: a policy statement from the American Heart Association.

    PubMed

    Heidenreich, Paul A; Albert, Nancy M; Allen, Larry A; Bluemke, David A; Butler, Javed; Fonarow, Gregg C; Ikonomidis, John S; Khavjou, Olga; Konstam, Marvin A; Maddox, Thomas M; Nichol, Graham; Pham, Michael; Piña, Ileana L; Trogdon, Justin G

    2013-05-01

    Heart failure (HF) is an important contributor to both the burden and cost of national healthcare expenditures, with more older Americans hospitalized for HF than for any other medical condition. With the aging of the population, the impact of HF is expected to increase substantially. We estimated future costs of HF by adapting a methodology developed by the American Heart Association to project the epidemiology and future costs of HF from 2012 to 2030 without double counting the costs attributed to comorbid conditions. The model assumes that HF prevalence will remain constant by age, sex, and race/ethnicity and that rising costs and technological innovation will continue at the same rate. By 2030, >8 million people in the United States (1 in every 33) will have HF. Between 2012 and 2030, real (2010$) total direct medical costs of HF are projected to increase from $21 billion to $53 billion. Total costs, including indirect costs for HF, are estimated to increase from $31 billion in 2012 to $70 billion in 2030. If one assumes all costs of cardiac care for HF patients are attributable to HF (no cost attribution to comorbid conditions), the 2030 projected cost estimates of treating patients with HF will be 3-fold higher ($160 billion in direct costs). The estimated prevalence and cost of care for HF will increase markedly because of aging of the population. Strategies to prevent HF and improve the efficiency of care are needed.

  12. Forecasting the Impact of Heart Failure in the United States

    PubMed Central

    Heidenreich, Paul A.; Albert, Nancy M.; Allen, Larry A.; Bluemke, David A.; Butler, Javed; Fonarow, Gregg C.; Ikonomidis, John S.; Khavjou, Olga; Konstam, Marvin A.; Maddox, Thomas M.; Nichol, Graham; Pham, Michael; Piña, Ileana L.; Trogdon, Justin G.

    2013-01-01

    Background Heart failure (HF) is an important contributor to both the burden and cost of national healthcare expenditures, with more older Americans hospitalized for HF than for any other medical condition. With the aging of the population, the impact of HF is expected to increase substantially. Methods and Results We estimated future costs of HF by adapting a methodology developed by the American Heart Association to project the epidemiology and future costs of HF from 2012 to 2030 without double counting the costs attributed to comorbid conditions. The model assumes that HF prevalence will remain constant by age, sex, and race/ethnicity and that rising costs and technological innovation will continue at the same rate. By 2030, >8 million people in the United States (1 in every 33) will have HF. Between 2012 and 2030, real (2010$) total direct medical costs of HF are projected to increase from $21 billion to $53 billion. Total costs, including indirect costs for HF, are estimated to increase from $31 billion in 2012 to $70 billion in 2030. If one assumes all costs of cardiac care for HF patients are attributable to HF (no cost attribution to comorbid conditions), the 2030 projected cost estimates of treating patients with HF will be 3-fold higher ($160 billion in direct costs). Conclusions The estimated prevalence and cost of care for HF will increase markedly because of aging of the population. Strategies to prevent HF and improve the efficiency of care are needed. PMID:23616602

  13. Development of hybrid lifecycle cost estimating tool (HLCET) for manufacturing influenced design tradeoff

    NASA Astrophysics Data System (ADS)

    Sirirojvisuth, Apinut

    In complex aerospace system design, making an effective design decision requires multidisciplinary knowledge from both product and process perspectives. Integrating manufacturing considerations into the design process is most valuable during the early design stages since designers have more freedom to integrate new ideas when changes are relatively inexpensive in terms of time and effort. Several metrics related to manufacturability are cost, time, and manufacturing readiness level (MRL). Yet, there is a lack of structured methodology that quantifies how changes in the design decisions impact these metrics. As a result, a new set of integrated cost analysis tools are proposed in this study to quantify the impacts. Equally important is the capability to integrate this new cost tool into the existing design methodologies without sacrificing agility and flexibility required during the early design phases. To demonstrate the applicability of this concept, a ModelCenter environment is used to develop software architecture that represents Integrated Product and Process Development (IPPD) methodology used in several aerospace systems designs. The environment seamlessly integrates product and process analysis tools and makes effective transition from one design phase to the other while retaining knowledge gained a priori. Then, an advanced cost estimating tool called Hybrid Lifecycle Cost Estimating Tool (HLCET), a hybrid combination of weight-, process-, and activity-based estimating techniques, is integrated with the design framework. A new weight-based lifecycle cost model is created based on Tailored Cost Model (TCM) equations [3]. This lifecycle cost tool estimates the program cost based on vehicle component weights and programmatic assumptions. Additional high fidelity cost tools like process-based and activity-based cost analysis methods can be used to modify the baseline TCM result as more knowledge is accumulated over design iterations. Therefore, with this concept, the additional manufacturing knowledge can be used to identify a more accurate lifecycle cost and facilitate higher fidelity tradeoffs during conceptual and preliminary design. Advanced Composite Cost Estimating Model (ACCEM) is employed as a process-based cost component to replace the original TCM result of the composite part production cost. The reason for the replacement is that TCM estimates production costs from part weights as a result of subtractive manufacturing of metallic origin such as casting, forging, and machining processes. A complexity factor can sometimes be adjusted to reflect different types of metal and machine settings. The TCM assumption, however, gives erroneous results when applied to additive processes like those of composite manufacturing. Another innovative aspect of this research is the introduction of a work measurement technique called Maynard Operation Sequence Technique (MOST) to be used, similarly to Activity-Based Costing (ABC) approach, to estimate manufacturing time of a part by virtue of breaking down the operations occurred during its production. ABC allows a realistic determination of cost incurred in each activity, as opposed to using a traditional method of time estimation by analogy or using response surface equations from historical process data. The MOST concept provides a tailored study of an individual process typically required for a new, innovative design. Nevertheless, the MOST idea has some challenges, one of which is its requirement to build a new process from ground up. The process development requires a Subject Matter Expertise (SME) in manufacturing method of the particular design. The SME must have also a comprehensive understanding of the MOST system so that the correct parameters are chosen. In practice, these knowledge requirements may demand people from outside of the design discipline and a priori training of MOST. To relieve the constraint, this study includes an entirely new sub-system architecture that comprises 1) a knowledge-based system to provide the required knowledge during the process selection; and 2) a new user-interface to guide the parameter selection when building the process using MOST. Also included in this study is the demonstration of how the HLCET and its constituents can be integrated with a Georgia Tech' Integrated Product and Process Development (IPPD) methodology. The applicability of this work will be shown through a complex aerospace design example to gain insights into how manufacturing knowledge helps make better design decisions during the early stages. The setup process is explained with an example of its utility demonstrated in a hypothetical fighter aircraft wing redesign. The evaluation of the system effectiveness against existing methodologies is illustrated to conclude the thesis.

  14. Nutrition economic evaluation of a probiotic in the prevention of antibiotic-associated diarrhea.

    PubMed

    Lenoir-Wijnkoop, Irene; Nuijten, Mark J C; Craig, Joyce; Butler, Christopher C

    2014-01-01

    Antibiotic-associated diarrhea (AAD) is common and frequently more severe in hospitalized elderly adults. It can lead to increased use of healthcare resources. We estimated the cost-effectiveness of a fermented milk (FM) with probiotic in preventing AAD and in particular Clostridium difficile-associated diarrhea (CDAD). Clinical effectiveness data and cost information were incorporated in a model to estimate the cost impact of administering a FM containing the probiotic Lactobacillus paracasei ssp paracasei CNCM I-1518 in a hospital setting. Preventing AAD by the consumption of the probiotic was compared to no preventive strategy. The probiotic intervention to prevent AAD generated estimated mean cost savings of £339 per hospitalized patient over the age of 65 years and treated with antibiotics, compared to no preventive probiotic. Estimated cost savings were sensitive to variation in the incidence of AAD, and to the proportion of patients who develop non-severe/severe AAD. However, probiotics remained cost saving in all sensitivity analyses. Use of the fermented dairy drink containing the probiotic L. paracasei CNCM I-1518 to prevent AAD in older hospitalized patients treated with antibiotics could lead to substantial cost savings.

  15. Estimated costs of production and potential prices for the WHO Essential Medicines List

    PubMed Central

    Hill, Andrew M; Barber, Melissa J

    2018-01-01

    Introduction There are persistent gaps in access to affordable medicines. The WHO Model List of Essential Medicines (EML) includes medicines considered necessary for functional health systems. Methods A generic price estimation formula was developed by reviewing published analyses of cost of production for medicines and assuming manufacture in India, which included costs of formulation, packaging, taxation and a 10% profit margin. Data on per-kilogram prices of active pharmaceutical ingredient exported from India were retrieved from an online database. Estimated prices were compared with the lowest globally available prices for HIV/AIDS, tuberculosis (TB) and malaria medicines, and current prices in the UK, South Africa and India. Results The estimation formula had good predictive accuracy for HIV/AIDS, TB and malaria medicines. Estimated generic prices ranged from US$0.01 to US$1.45 per unit, with most in the lower end of this range. Lowest available prices were greater than estimated generic prices for 214/277 (77%) comparable items in the UK, 142/212 (67%) in South Africa and 118/298 (40%) in India. Lowest available prices were more than three times above estimated generic price for 47% of cases compared in the UK and 22% in South Africa. Conclusion A wide range of medicines in the EML can be profitably manufactured at very low cost. Most EML medicines are sold in the UK and South Africa at prices significantly higher than those estimated from production costs. Generic price estimation and international price comparisons could empower government price negotiations and support cost-effectiveness calculations. PMID:29564159

  16. PARVCOST : a particleboard variable cost program

    Treesearch

    Peter J. Ince; George B. Harpole

    1977-01-01

    PARVCOST, a FORTRAN program, was designed to develop economic and financial analyses of systems for manufacturing particleboard. In the program, costs and requirements of wood are calculated as are chemicals and energy per unit of finished board products. Estimates are made of sensitivity of the finished product costs to changes in unit costs of energy and raw...

  17. Estimating the costs of induced abortion in Uganda: A model-based analysis

    PubMed Central

    2011-01-01

    Background The demand for induced abortions in Uganda is high despite legal and moral proscriptions. Abortion seekers usually go to illegal, hidden clinics where procedures are performed in unhygienic environments by under-trained practitioners. These abortions, which are usually unsafe, lead to a high rate of severe complications and use of substantial, scarce healthcare resources. This study was performed to estimate the costs associated with induced abortions in Uganda. Methods A decision tree was developed to represent the consequences of induced abortion and estimate the costs of an average case. Data were obtained from a primary chart abstraction study, an on-going prospective study, and the published literature. Societal costs, direct medical costs, direct non-medical costs, indirect (productivity) costs, costs to patients, and costs to the government were estimated. Monte Carlo simulation was used to account for uncertainty. Results The average societal cost per induced abortion (95% credibility range) was $177 ($140-$223). This is equivalent to $64 million in annual national costs. Of this, the average direct medical cost was $65 ($49-86) and the average direct non-medical cost was $19 ($16-$23). The average indirect cost was $92 ($57-$139). Patients incurred $62 ($46-$83) on average while government incurred $14 ($10-$20) on average. Conclusion Induced abortions are associated with substantial costs in Uganda and patients incur the bulk of the healthcare costs. This reinforces the case made by other researchers--that efforts by the government to reduce unsafe abortions by increasing contraceptive coverage or providing safe, legal abortions are critical. PMID:22145859

  18. Estimating the costs of induced abortion in Uganda: a model-based analysis.

    PubMed

    Babigumira, Joseph B; Stergachis, Andy; Veenstra, David L; Gardner, Jacqueline S; Ngonzi, Joseph; Mukasa-Kivunike, Peter; Garrison, Louis P

    2011-12-06

    The demand for induced abortions in Uganda is high despite legal and moral proscriptions. Abortion seekers usually go to illegal, hidden clinics where procedures are performed in unhygienic environments by under-trained practitioners. These abortions, which are usually unsafe, lead to a high rate of severe complications and use of substantial, scarce healthcare resources. This study was performed to estimate the costs associated with induced abortions in Uganda. A decision tree was developed to represent the consequences of induced abortion and estimate the costs of an average case. Data were obtained from a primary chart abstraction study, an on-going prospective study, and the published literature. Societal costs, direct medical costs, direct non-medical costs, indirect (productivity) costs, costs to patients, and costs to the government were estimated. Monte Carlo simulation was used to account for uncertainty. The average societal cost per induced abortion (95% credibility range) was $177 ($140-$223). This is equivalent to $64 million in annual national costs. Of this, the average direct medical cost was $65 ($49-86) and the average direct non-medical cost was $19 ($16-$23). The average indirect cost was $92 ($57-$139). Patients incurred $62 ($46-$83) on average while government incurred $14 ($10-$20) on average. Induced abortions are associated with substantial costs in Uganda and patients incur the bulk of the healthcare costs. This reinforces the case made by other researchers--that efforts by the government to reduce unsafe abortions by increasing contraceptive coverage or providing safe, legal abortions are critical.

  19. Maximum Likelihood Estimation with Emphasis on Aircraft Flight Data

    NASA Technical Reports Server (NTRS)

    Iliff, K. W.; Maine, R. E.

    1985-01-01

    Accurate modeling of flexible space structures is an important field that is currently under investigation. Parameter estimation, using methods such as maximum likelihood, is one of the ways that the model can be improved. The maximum likelihood estimator has been used to extract stability and control derivatives from flight data for many years. Most of the literature on aircraft estimation concentrates on new developments and applications, assuming familiarity with basic estimation concepts. Some of these basic concepts are presented. The maximum likelihood estimator and the aircraft equations of motion that the estimator uses are briefly discussed. The basic concepts of minimization and estimation are examined for a simple computed aircraft example. The cost functions that are to be minimized during estimation are defined and discussed. Graphic representations of the cost functions are given to help illustrate the minimization process. Finally, the basic concepts are generalized, and estimation from flight data is discussed. Specific examples of estimation of structural dynamics are included. Some of the major conclusions for the computed example are also developed for the analysis of flight data.

  20. Earth Sciences Data and Information System (ESDIS) program planning and evaluation methodology development

    NASA Technical Reports Server (NTRS)

    Dickinson, William B.

    1995-01-01

    An Earth Sciences Data and Information System (ESDIS) Project Management Plan (PMP) is prepared. An ESDIS Project Systems Engineering Management Plan (SEMP) consistent with the developed PMP is also prepared. ESDIS and related EOS program requirements developments, management and analysis processes are evaluated. Opportunities to improve the effectiveness of these processes and program/project responsiveness to requirements are identified. Overall ESDIS cost estimation processes are evaluated, and recommendations to improve cost estimating and modeling techniques are developed. ESDIS schedules and scheduling tools are evaluated. Risk assessment, risk mitigation strategies and approaches, and use of risk information in management decision-making are addressed.

  1. Airframe RDT&E Cost Estimating: A Justification for and Development of Unique Cost Estimating Relationships According to Aircraft Type.

    DTIC Science & Technology

    1982-09-01

    characteristics) for one or more aircraft which had been tempor- arily excluded from the data base. Provided these results proved satis- factory , all of the...8217 . ; ;AI - U .*- .. ." ... , -Lt" U :% 170.,, ..’ ,:, -:iZ,: . APPENDIX G FACTOR ANALYSIS INITIAL 1 71 239= RUN UKI FACTOR ANALISIS 𔃾

  2. The cost of karst subsidence and sinkhole collapse in the United States compared with other natural hazards

    USGS Publications Warehouse

    Weary, David J.

    2015-01-01

    Rocks with potential for karst formation are found in all 50 states. Damage due to karst subsidence and sinkhole collapse is a natural hazard of national scope. Repair of damage to buildings, highways, and other infrastructure represents a significant national cost. Sparse and incomplete data show that the average cost of karst-related damages in the United States over the last 15 years is estimated to be at least $300,000,000 per year and the actual total is probably much higher. This estimate is lower than the estimated annual costs for other natural hazards; flooding, hurricanes and cyclonic storms, tornadoes, landslides, earthquakes, or wildfires, all of which average over $1 billion per year. Very few state organizations track karst subsidence and sinkhole damage mitigation costs; none occurs at the Federal level. Many states discuss the karst hazard in their State hazard mitigation plans, but seldom include detailed reports of subsidence incidents or their mitigation costs. Most State highway departments do not differentiate karst subsidence or sinkhole collapse from other road repair costs. Amassing of these data would raise the estimated annual cost considerably. Information from insurance organizations about sinkhole damage claims and payouts is also not readily available. Currently there is no agency with a mandate for developing such data. If a more realistic estimate could be made, it would illuminate the national scope of this hazard and make comparison with costs of other natural hazards more realistic.

  3. Which cost of alcohol? What should we compare it against?

    PubMed

    Bhattacharya, Aveek

    2017-04-01

    This paper explores and develops issues raised by recent debates about the cost of alcohol to England and Wales. It advances two arguments. First, that the commonly used estimates for alcohol harm in England and Wales are outdated, not fully reliable and in need of revisiting. These estimates rely on data that are between 4 and 12 years out of date and sensitive to questionable assumptions and methodological judgements. Secondly, it argues that policymakers, academics and non-governmental organizations should be more careful in their use of these numbers. In particular, it is imperative that the numbers quoted fit the argument advanced. To help guide such appropriate usage, the different types of cost of alcohol are surveyed, alongside some thoughts on the questions they help us to answer and what they imply for policy. For example, comprehensive estimates of the total social cost of alcohol provide an indication of the scale of the problem, but have limited policy relevance. External cost estimates represent a 'lowest common denominator' approach acceptable to most, but require additional assumptions to guide action. Narrower perspectives, such as fiscal, economic or health costs, may be relevant in specific contexts. However, optimal policy should take a holistic view of all the relevant costs and benefits. Similarly, focusing solely on tangible costs may be less controversial, but will result in an under-estimate of the relevant costs of alcohol. © 2016 Society for the Study of Addiction.

  4. Engineering aspects of geothermal development with emphasis on the Imperial Valley of California

    NASA Technical Reports Server (NTRS)

    Goldsmith, M.

    1978-01-01

    This review was prepared in support of a geothermal planning activity of the County of Imperial. Engineering features of potential geothermal development are outlined. Acreage requirements for drilling and powerplants are estimated, as are the costs for wells, fluid transmission pipes, and generating stations. Rough scaling relationships are developed for cost factors as a function of reservoir temperature. Estimates are made for cooling water requirements, and possible sources of cooling water are discussed. Availability and suitability of agricultural wastewater for cooling are emphasized. The utility of geothermal resources for fresh water production in the Imperial Valley is considered.

  5. A Cost of Illness Study of Children with High-Functioning Autism Spectrum Disorders and Comorbid Anxiety Disorders as Compared to Clinically Anxious and Typically Developing Children

    ERIC Educational Resources Information Center

    Steensel, Francisca J.; Dirksen, Carmen D.; Bögels, Susan M.

    2013-01-01

    The study's aim was to estimate the societal costs of children with high-functioning ASD and comorbid anxiety disorder(s) (ASD + AD-group; n = 73), and to compare these costs to children with anxiety disorders (AD-group; n = 34), and typically developing children (controls; n = 87). Mean total costs for the ASD + AD-group amounted €17,380 per…

  6. 2003 IDA Cost Research Symposium: Cost of Evolutionary Acquisition/Spiral Development

    DTIC Science & Technology

    2003-08-01

    Louis, Missouri”, IDA Paper P-3548 “Econometric Modeling of Acquisition Category I Systems at the Lockheed- Martin Plant in Marietta , Georgia”, IDA...Systems Command (NAVSEA)..................................................... B- 71 Naval Surface Warfare Center, Dahlgren Division (NSWCDD...cost estimates and reports on life-cycle costs of major defense acquisition programs (MDAPs) in Acquisition Category ID (see Reference [1]). Cost

  7. Cost-estimate and proposal for a development impact bond for canine rabies elimination by mass vaccination in Chad.

    PubMed

    Anyiam, Franziska; Lechenne, Monique; Mindekem, Rolande; Oussigéré, Assandi; Naissengar, Service; Alfaroukh, Idriss Oumar; Mbilo, Celine; Moto, Daugla Doumagoum; Coleman, Paul G; Probst-Hensch, Nicole; Zinsstag, Jakob

    2017-11-01

    Close to 69,000 humans die of rabies each year, most of them in Africa and Asia. Clinical rabies can be prevented by post-exposure prophylaxis (PEP). However, PEP is commonly not available or not affordable in developing countries. Another strategy besides treating exposed humans is the vaccination of vector species. In developing countries, the main vector is the domestic dog, that, once infected, is a serious threat to humans. After a successful mass vaccination of 70% of the dogs in N'Djaména, we report here a cost-estimate for a national rabies elimination campaign for Chad. In a cross-sectional survey in four rural zones, we established the canine : human ratio at the household level. Based on human census data and the prevailing socio-cultural composition of rural zones of Chad, the total canine population was estimated at 1,205,361 dogs (95% Confidence interval 1,128,008-1,736,774 dogs). Cost data were collected from government sources and the recent canine mass vaccination campaign in N'Djaména. A Monte Carlo simulation was used for the simulation of the average cost and its variability, using probability distributions for dog numbers and cost items. Assuming the vaccination of 100 dogs on average per vaccination post and a duration of one year, the total cost for the vaccination of the national Chadian canine population is estimated at 2,716,359 Euros (95% CI 2,417,353-3,035,081) for one vaccination round. A development impact bond (DIB) organizational structure and cash flow scenario were then developed for the elimination of canine rabies in Chad. Cumulative discounted cost of 28.3 million Euros over ten years would be shared between the government of Chad, private investors and institutional donors as outcome funders. In this way, the risk of the investment could be shared and the necessary investment could be made available upfront - a key element for the elimination of canine rabies in Chad. Copyright © 2016 The Authors. Published by Elsevier B.V. All rights reserved.

  8. The costs of nurse turnover: part 1: an economic perspective.

    PubMed

    Jones, Cheryl Bland

    2004-12-01

    Nurse turnover is costly for healthcare organizations. Administrators and nurse executives need a reliable estimate of nurse turnover costs and the origins of those costs if they are to develop effective measures of reducing nurse turnover and its costs. However, determining how to best capture and quantify nurse turnover costs can be challenging. Part 1 of this series conceptualizes nurse turnover via human capital theory and presents an update of a previously developed method for determining the costs of nurse turnover, the Nursing Turnover Cost Calculation Method. Part 2 (January 2005) presents a recent application of the methodology in an acute care hospital.

  9. Assays for estimating HIV incidence: updated global market assessment and estimated economic value.

    PubMed

    Morrison, Charles S; Homan, Rick; Mack, Natasha; Seepolmuang, Pairin; Averill, Megan; Taylor, Jamilah; Osborn, Jennifer; Dailey, Peter; Parkin, Neil; Ongarello, Stefano; Mastro, Timothy D

    2017-11-01

    Accurate incidence estimates are needed to characterize the HIV epidemic and guide prevention efforts. HIV Incidence assays are cost-effective laboratory assays that provide incidence estimates from cross-sectional surveys. We conducted a global market assessment of HIV incidence assays under three market scenarios and estimated the economic value of improved incidence assays. We interviewed 27 stakeholders, and reviewed journal articles, working group proceedings, and manufacturers' sales figures. We determined HIV incidence assay use in 2014, and estimated use in 2015 to 2017 and in 5 to 10-years under three market scenarios, as well as the cost of conducting national and key population surveys using an HIV incidence assay with improved performance. Global 2014 HIV incidence assay use was 308,900 tests, highest in Asia and mostly for case- and population-based surveillance. Estimated 2015 to 2017 use was 94,475 annually, with declines due to China and the United States discontinuing incidence assay use for domestic surveillance. Annual projected 5 to 10 year use under scenario 1 - no change in technology - was 94,475. For scenario 2 - a moderately improved incidence assay - projected annual use was 286,031. Projected annual use for scenario 3 - game-changing technologies with an HIV incidence assay part of (a) standard confirmatory testing, and (b) standard rapid testing, were 500,000 and 180 million, respectively. As HIV incidence assay precision increases, decreased sample sizes required for incidence estimation resulted in $5 to 23 million annual reductions in survey costs and easily offset the approximately $3 million required to develop a new assay. Improved HIV incidence assays could substantially reduce HIV incidence estimation costs. Continued development of HIV incidence assays with improved performance is required to realize these cost benefits. © 2017 The Authors. Journal of the International AIDS Society published by John Wiley & sons Ltd on behalf of the International AIDS Society.

  10. Costs of management of patients with coronary artery disease in Poland: the multicenter RECENT study.

    PubMed

    Jaworski, Rafał; Jankowska, Ewa A; Ponikowski, Piotr; Banasiak, Waldemar

    2012-01-01

    Treatment of coronary artery disease (CAD) generates the major part of public health expenditure in the developed countries. The aim of the study was to estimate costs associated with the diagnosis and treatment of patients with CAD in Poland. Costs were estimated in a representative sample of 2593 patients with CAD receiving general practitioner (n = 1977) or specialist care (n = 616) in 2005 (the multicenter RECENT study). Data from the National Health Fund, Social Insurance Institution, Central Statistical Office, and current literature were used. The total annual cost of CAD reached €2254.17 per patient, with 48% accounting for direct medical costs (drugs, medical consultations, laboratory tests, diagnostic procedures, invasive treatment, hospitalizations, emergency care) and 52% for indirect costs (related to absence at work and disability). Eighty-one percent of total direct medical costs were covered by the public payer (including 30% of pharmacological treatment costs). Direct medical costs covered by the public payer were higher in men and in patients with more severe angina symptoms (both P <0.05). In the model based on the lowest prevalence of CAD (estimated based on the real population of patients treated in 2005), direct medical costs covered by the public payer reached €617.6 million, i.e., around 7% of the total public health expenditure in Poland in 2005. Modern management of CAD imposes enormous economic burden on the public health system in Poland. There is a need to develop and implement strategies that would optimize health care costs associated with the treatment of CAD.

  11. Development of a Carbon Management Geographic Information System (GIS) for the United States

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Howard Herzog; Holly Javedan

    In this project a Carbon Management Geographical Information System (GIS) for the US was developed. The GIS stored, integrated, and manipulated information relating to the components of carbon management systems. Additionally, the GIS was used to interpret and analyze the effect of developing these systems. This report documents the key deliverables from the project: (1) Carbon Management Geographical Information System (GIS) Documentation; (2) Stationary CO{sub 2} Source Database; (3) Regulatory Data for CCS in United States; (4) CO{sub 2} Capture Cost Estimation; (5) CO{sub 2} Storage Capacity Tools; (6) CO{sub 2} Injection Cost Modeling; (7) CO{sub 2} Pipeline Transport Costmore » Estimation; (8) CO{sub 2} Source-Sink Matching Algorithm; and (9) CO{sub 2} Pipeline Transport and Cost Model.« less

  12. Developing a cost effective environmental solution for produced water and creating a ''new'' water resource

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Doran, Glenn; Leong, Lawrence Y.C.

    2000-05-01

    The project goal is to convert a currently usable by-product of oil production, produced water, into a valuable drinking water resource. The project was located at the Placate Oil Field in Santa Clarita, California, approximately 25 miles north of Los Angeles. The project included a literature review of treatment technologies; preliminary bench-scale studies to refine a planning level cost estimate; and a 10-100 gpm pilot study to develop the conceptual design and cost estimate for a 44,000 bpd treatment facility. A reverse osmosis system was constructed, pilot tested, and the data used to develop a conceptual design and operation ofmore » four operational scenarios, two industrial waters levels and two irrigation/potable water.« less

  13. Ecosystem services impacts associated with environmental ...

    EPA Pesticide Factsheets

    Nitrogen release to the environment from human activities can have important and costly impacts on human health, recreation, transportation, fisheries, and ecosystem health. Recent efforts to quantify these damage costs have identified annual damages associated with reactive nitrogen release to the EU and US in the hundreds of billions of US dollars (USD). The general approach used to estimate these damages associated with reactive nitrogen are derived from a variety of methods to estimate economic damages, for example, impacts to human respiratory health in terms of hospital visits and mortality, willingness to pay to improve a water body and costs to replace or treat drinking water systems affected by nitrate or cyanotoxin contamination. These values are then extrapolated to other areas to develop the damage cost estimates that are probably best seen as potential damage costs, particularly for aquatic ecosystems. We seek to provide an additional verification of these potential damages using data assembled by the US EPA for case studies of measured costs of nutrient impacts across the US from 2000-2012. We compare the spatial distribution and the magnitude of these costs with the spatial distribution and magnitude of costs from HUC8 watershed units across the US by Sobota et al. (2015). We anticipate that this analysis will provide a ground truthing of existing damage cost estimates, and continue to support the incorporation of cost and benefit informatio

  14. Societal costs versus savings from wild-card patent extension legislation to spur critically needed antibiotic development.

    PubMed

    Spellberg, B; Miller, L G; Kuo, M N; Bradley, J; Scheld, W M; Edwards, J E

    2007-06-01

    Over the last two decades, an alarming rise in infections caused by antibiotic-resistant microbes has been paralleled by an equally alarming decline in the development of new antibiotics to deal with the threat. In response to this brewing "perfect storm" of infectious diseases, the Infectious Diseases Society of America (IDSA) has released a white paper that proposes incentives to stimulate critically needed antibiotic development by pharmaceutical companies. A cornerstone of the recommendations is establishment of a "wild-card patent extension" program. This program would allow a company receiving United States (US) Food and Drug Administration (FDA) approval for a new anti-infective agent targeting a drug-resistant pathogen to extend the patent on a drug within their active portfolio. However, wild-card patent extension legislation is highly controversial due to concerns regarding its societal cost. We performed a systematic literature review to estimate the societal cost of wild-card patent extension compared to the savings resulting from the availability of one new antibiotic to treat multi-drug-resistant Pseudomonas aeruginosa. We conservatively estimate that wild-card patent extension applied to one new antibiotic would cost $7.7 billion over the first 2 years, and $3.9 billion over the next 18 years. Thus, even if the new antibiotic abrogated only 50% of the annual societal cost of multidrug-resistant P. aeruginosa (estimated $2.7 billion), wild-card patent extension would be cost neutral by 10 years after approval of the new antibiotic, and would save society approximately $4.6 billion by 20 years after approval. Wild-card patent extension appears to be a cost-effective strategy to spur anti-infective development. Although our analysis is limited by the precision of published data, our model employed conservative assumptions.

  15. The effects of incremental costs of smoking and obesity on health care costs among adults: a 7-year longitudinal study.

    PubMed

    Moriarty, James P; Branda, Megan E; Olsen, Kerry D; Shah, Nilay D; Borah, Bijan J; Wagie, Amy E; Egginton, Jason S; Naessens, James M

    2012-03-01

    To provide the simultaneous 7-year estimates of incremental costs of smoking and obesity among employees and dependents in a large health care system. We used a retrospective cohort aged 18 years or older with continuous enrollment during the study period. Longitudinal multivariate cost analyses were performed using generalized estimating equations with demographic adjustments. The annual incremental mean costs of smoking by age group ranged from $1274 to $1401. The incremental costs of morbid obesity II by age group ranged from $5467 to $5530. These incremental costs drop substantially when comorbidities are included. Obesity and smoking have large long-term impacts on health care costs of working-age adults. Controlling comorbidities impacted incremental costs of obesity but may lead to underestimation of the true incremental costs because obesity is a risk factor for developing chronic conditions.

  16. An economic model for evaluating high-speed aircraft designs

    NASA Technical Reports Server (NTRS)

    Vandervelden, Alexander J. M.

    1989-01-01

    A Class 1 method for determining whether further development of a new aircraft design is desirable from all viewpoints is presented. For the manufacturer the model gives an estimate of the total cost of research and development from the preliminary design to the first production aircraft. Using Wright's law of production, one can derive the average cost per aircraft produced for a given break-even number. The model will also provide the airline with a good estimate of the direct and indirect operating costs. From the viewpoint of the passenger, the model proposes a tradeoff between ticket price and cruise speed. Finally all of these viewpoints are combined in a Comparative Aircraft Seat-kilometer Economic Index.

  17. Child Care: How Do Military and Civilian Center Costs Compare? United States General Accounting Office Report to Congressional Requesters.

    ERIC Educational Resources Information Center

    Fagnoni, Cynthia M.

    The Department of Defense's (DOD) child development program has been identified as a model for the rest of the nation. To provide a benchmark cost estimate for Congress as it addresses child care issues, this report identifies the objectives of the military child development program, describes its operation, determines the full costs of DOD…

  18. Computer programs for estimating civil aircraft economics

    NASA Technical Reports Server (NTRS)

    Maddalon, D. V.; Molloy, J. K.; Neubawer, M. J.

    1980-01-01

    Computer programs for calculating airline direct operating cost, indirect operating cost, and return on investment were developed to provide a means for determining commercial aircraft life cycle cost and economic performance. A representative wide body subsonic jet aircraft was evaluated to illustrate use of the programs.

  19. NTR-Enhanced Lunar-Base Supply using Existing Launch Fleet Capabilities

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    John D. Bess; Emily Colvin; Paul G. Cummings

    During the summer of 2006, students at the Center for Space Nuclear Research sought to augment the current NASA lunar exploration architecture with a nuclear thermal rocket (NTR). An additional study investigated the possible use of an NTR with existing launch vehicles to provide 21 metric tons of supplies to the lunar surface in support of a lunar outpost. Current cost estimates show that the complete mission cost for an NTR-enhanced assembly of Delta-IV and Atlas V vehicles may cost 47-86% more than the estimated Ares V launch cost of $1.5B; however, development costs for the current NASA architecture havemore » not been assessed. The additional cost of coordinating the rendezvous of four to six launch vehicles with an in-orbit assembly facility also needs more thorough analysis and review. Future trends in launch vehicle use will also significantly impact the results from this comparison. The utility of multiple launch vehicles allows for the development of a more robust and lower risk exploration architecture.« less

  20. Space Transportatioin System (STS) propellant scavenging system study. Volume 3: Cost and work breakdown structure-dictionary

    NASA Technical Reports Server (NTRS)

    1985-01-01

    Fundamentally, the volumes of the oxidizer and fuel propellant scavenged from the orbiter and external tank determine the size and weight of the scavenging system. The optimization of system dimensions and weights is stimulated by the requirement to minimize the use of partial length of the orbiter payload bay. Thus, the cost estimates begin with weights established for the optimum design. Both the design, development, test, and evaluation and theoretical first unit hardware production costs are estimated from parametric cost weight scaling relations for four subsystems. For cryogenic propellants, the widely differing characteristics of the oxidizer and the fuel lead to two separate tank subsystems, in addition to the electrical and instrumentation subsystems. Hardwares costs also involve quantity, as an independent variable, since the number of production scavenging systems is not firm. For storable propellants, since the tankage volume of the oxidizer and fuel are equal, the hardware production costs for developing these systems are lower than for cryogenic propellants.

  1. Costs of a work-family intervention: evidence from the work, family, and health network.

    PubMed

    Barbosa, Carolina; Bray, Jeremy W; Brockwood, Krista; Reeves, Daniel

    2014-01-01

    To estimate the cost to the workplace of implementing initiatives to reduce work-family conflict. Prospective cost analysis conducted alongside a group-randomized multisite controlled experimental study, using a microcosting approach. An information technology firm. Employees (n = 1004) and managers (n = 141) randomized to the intervention arm. STAR (Start. Transform. Achieve. Results.) to enhance employees' control over their work time, increase supervisor support for employees to manage work and family responsibilities, and reorient the culture toward results. A taxonomy of activities related to customization, start-up, and implementation was developed. Resource use and unit costs were estimated for each activity, excluding research-related activities. Economic costing approach (accounting and opportunity costs). Sensitivity analyses on intervention costs. The total cost of STAR was $709,654, of which $389,717 was labor costs and $319,937 nonlabor costs (including $313,877 for intervention contract). The cost per employee participation in the intervention was $340 (95% confidence interval: $330-$351); $597 ($561-$634) for managers and $300 ($292-$308) for other employees (2011 prices). A detailed activity costing approach allows for more accurate cost estimates and identifies key drivers of cost. The key cost driver was employees' time spent on receiving the intervention. Ignoring this cost, which is usual in studies that cost workplace interventions, would seriously underestimate the cost of a workplace initiative.

  2. Mind the Gap! A Multilevel Analysis of Factors Related to Variation in Published Cost-Effectiveness Estimates within and between Countries.

    PubMed

    Boehler, Christian E H; Lord, Joanne

    2016-01-01

    Published cost-effectiveness estimates can vary considerably, both within and between countries. Despite extensive discussion, little is known empirically about factors relating to these variations. To use multilevel statistical modeling to integrate cost-effectiveness estimates from published economic evaluations to investigate potential causes of variation. Cost-effectiveness studies of statins for cardiovascular disease prevention were identified by systematic review. Estimates of incremental costs and effects were extracted from reported base case, sensitivity, and subgroup analyses, with estimates grouped in studies and in countries. Three bivariate models were developed: a cross-classified model to accommodate data from multinational studies, a hierarchical model with multinational data allocated to a single category at country level, and a hierarchical model excluding multinational data. Covariates at different levels were drawn from a long list of factors suggested in the literature. We found 67 studies reporting 2094 cost-effectiveness estimates relating to 23 countries (6 studies reporting for more than 1 country). Data and study-level covariates included patient characteristics, intervention and comparator cost, and some study methods (e.g., discount rates and time horizon). After adjusting for these factors, the proportion of variation attributable to countries was negligible in the cross-classified model but moderate in the hierarchical models (14%-19% of total variance). Country-level variables that improved the fit of the hierarchical models included measures of income and health care finance, health care resources, and population risks. Our analysis suggested that variability in published cost-effectiveness estimates is related more to differences in study methods than to differences in national context. Multinational studies were associated with much lower country-level variation than single-country studies. These findings are for a single clinical question and may be atypical. © The Author(s) 2015.

  3. Major weapon system environmental life-cycle cost estimating for Conservation, Cleanup, Compliance and Pollution Prevention (C3P2)

    NASA Technical Reports Server (NTRS)

    Hammond, Wesley; Thurston, Marland; Hood, Christopher

    1995-01-01

    The Titan 4 Space Launch Vehicle Program is one of many major weapon system programs that have modified acquisition plans and operational procedures to meet new, stringent environmental rules and regulations. The Environmental Protection Agency (EPA) and the Department of Defense (DOD) mandate to reduce the use of ozone depleting chemicals (ODC's) is just one of the regulatory changes that has affected the program. In the last few years, public environmental awareness, coupled with stricter environmental regulations, has created the need for DOD to produce environmental life-cycle cost estimates (ELCCE) for every major weapon system acquisition program. The environmental impact of the weapon system must be assessed and budgeted, considering all costs, from cradle to grave. The Office of the Secretary of Defense (OSD) has proposed that organizations consider Conservation, Cleanup, Compliance and Pollution Prevention (C(sup 3)P(sup 2)) issues associated with each acquisition program to assess life-cycle impacts and costs. The Air Force selected the Titan 4 system as the pilot program for estimating life-cycle environmental costs. The estimating task required participants to develop an ELCCE methodology, collect data to test the methodology and produce a credible cost estimate within the DOD C(sup 3)P(sup 2) definition. The estimating methodology included using the Program Office weapon system description and work breakdown structure together with operational site and manufacturing plant visits to identify environmental cost drivers. The results of the Titan IV ELCCE process are discussed and expanded to demonstrate how they can be applied to satisfy any life-cycle environmental cost estimating requirement.

  4. Integrating Efficiency of Industry Processes and Practices Alongside Technology Effectiveness in Space Transportation Cost Modeling and Analysis

    NASA Technical Reports Server (NTRS)

    Zapata, Edgar

    2012-01-01

    This paper presents past and current work in dealing with indirect industry and NASA costs when providing cost estimation or analysis for NASA projects and programs. Indirect costs, when defined as those costs in a project removed from the actual hardware or software hands-on labor; makes up most of the costs of today's complex large scale NASA space/industry projects. This appears to be the case across phases from research into development into production and into the operation of the system. Space transportation is the case of interest here. Modeling and cost estimation as a process rather than a product will be emphasized. Analysis as a series of belief systems in play among decision makers and decision factors will also be emphasized to provide context.

  5. Advanced Transportation System Studies. Technical Area 3: Alternate Propulsion Subsystems Concepts. Volume 3; Program Cost Estimates

    NASA Technical Reports Server (NTRS)

    Levack, Daniel J. H.

    2000-01-01

    The objective of this contract was to provide definition of alternate propulsion systems for both earth-to-orbit (ETO) and in-space vehicles (upper stages and space transfer vehicles). For such propulsion systems, technical data to describe performance, weight, dimensions, etc. was provided along with programmatic information such as cost, schedule, needed facilities, etc. Advanced technology and advanced development needs were determined and provided. This volume separately presents the various program cost estimates that were generated under three tasks: the F- IA Restart Task, the J-2S Restart Task, and the SSME Upper Stage Use Task. The conclusions, technical results , and the program cost estimates are described in more detail in Volume I - Executive Summary and in individual Final Task Reports.

  6. HMG versus rFSH for ovulation induction in developing countries: a cost-effectiveness analysis based on the results of a recent meta-analysis.

    PubMed

    Al-Inany, Hesham G; Abou-Setta, Ahmed M; Aboulghar, Mohamed A; Mansour, Ragaa T; Serour, Gamal I

    2006-02-01

    Both cost and effectiveness should be considered conjointly to aid judgments about drug choice. Therefore, based on the results of a recent published meta-analysis, a Markov model was developed to conduct a cost-effectiveness analysis for estimation of the cost of an ongoing pregnancy in IVF/intracytoplasmic sperm injection (ICSI) cycles. In addition, Monte Carlo micro-simulation was used to examine the potential impact of assumptions and other uncertainties represented in the model. The results of the study reveal that the estimated average cost of an ongoing pregnancy is 13,946 Egyptian pounds (EGP), and 18,721 EGP for a human menopausal gonadotrophin (HMG) and rFSH cycle respectively. On performing a sensitivity analysis on cycle costs, it was demonstrated that the rFSH price should be 0.61 EGP/IU to be as cost-effective as HMG at the price of 0.64 EGP/IU (i.e. around 60% reduction in its current price). The difference in cost between HMG and rFSH in over 100,000 cycles would result in an additional 4565 ongoing pregnancies if HMG was used. Therefore, HMG was clearly more cost-effective than rFSH. The decision to adopt a more expensive, cost-ineffective treatment could result in a lower number of cycles of IVF/ICSI treatment undertaken, especially in the case of most developing countries.

  7. [Methodology for estimating total direct costs of comprehensive care for non-communicable diseases].

    PubMed

    Castillo, Nancy; Malo, Miguel; Villacres, Nilda; Chauca, José; Cornetero, Víctor; de Flores, Karin Roedel; Tapia, Rafaela; Ríos, Raúl

    2017-01-01

    RESUMEN Diseases like diabetes mellitus (DM) and hypertension (HT) generate high costs and are the most common cause of mortality in the Americas. In the case of Peru, given demographic and epidemiological changes, particularly the alarming increase in overweight and obesity, the burden of these diseases is constantly increasing, resulting in the need to budget more financial resources to the health services. The total care costs of these diseases and their complications represent a financial burden that should be considered very carefully by health institutions when they draft their budgets. With this aim, the Pan American Health Organization has assisted the Ministry of Health (MINSA) with a study to estimate these costs. This article graphically describes the methodology developed to estimate the direct costs of comprehensive care for DM and HT to the health services of MINSA and regional governments.

  8. Global cost of child survival: estimates from country-level validation

    PubMed Central

    van Ekdom, Liselore; Scherpbier, Robert W; Niessen, Louis W

    2011-01-01

    Abstract Objective To cross-validate the global cost of scaling up child survival interventions to achieve the fourth Millennium Development Goal (MDG4) as estimated by the World Health Organization (WHO) in 2007 by using the latest country-provided data and new assumptions. Methods After the main cost categories for each country were identified, validation questionnaires were sent to 32 countries with high child mortality. Publicly available estimates for disease incidence, intervention coverage, prices and resources for individual-level and programme-level activities were validated against local data. Nine updates to the 2007 WHO model were generated using revised assumptions. Finally, estimates were extrapolated to 75 countries and combined with cost estimates for immunization and malaria programmes and for programmes for the prevention of mother-to-child transmission of the human immunodeficiency virus (HIV). Findings Twenty-six countries responded. Adjustments were largest for system- and programme-level data and smallest for patient data. Country-level validation caused a 53% increase in original cost estimates (i.e. 9 billion 2004 United States dollars [US$]) for 26 countries owing to revised system and programme assumptions, especially surrounding community health worker costs. The additional effect of updated population figures was small; updated epidemiologic figures increased costs by US$ 4 billion (+15%). New unit prices in the 26 countries that provided data increased estimates by US$ 4.3 billion (+16%). Extrapolation to 75 countries increased the original price estimate by US$ 33 billion (+80%) for 2010–2015. Conclusion Country-level validation had a significant effect on the cost estimate. Price adaptations and programme-related assumptions contributed substantially. An additional 74 billion US$ 2005 (representing a 12% increase in total health expenditure) would be needed between 2010 and 2015. Given resource constraints, countries will need to prioritize health activities within their national resource envelope. PMID:21479091

  9. A cost-effectiveness evaluation of hospital discharge counseling by pharmacists.

    PubMed

    Chinthammit, Chanadda; Armstrong, Edward P; Warholak, Terri L

    2012-04-01

    This study estimated the cost-effectiveness of pharmacist discharge counseling on medication-related morbidity in both the high-risk elderly and general US population. A cost-effectiveness decision analytic model was developed using a health care system perspective based on published clinical trials. Costs included direct medical costs, and the effectiveness unit was patients discharged without suffering a subsequent adverse drug event. A systematic review of published studies was conducted to estimate variable probabilities in the cost-effectiveness model. To test the robustness of the results, a second-order probabilistic sensitivity analysis (Monte Carlo simulation) was used to run 10 000 cases through the model sampling across all distributions simultaneously. Pharmacist counseling at hospital discharge provided a small, but statistically significant, clinical improvement at a similar overall cost. Pharmacist counseling was cost saving in approximately 48% of scenarios and in the remaining scenarios had a low willingness-to-pay threshold for all scenarios being cost-effective. In addition, discharge counseling was more cost-effective in the high-risk elderly population compared to the general population. This cost-effectiveness analysis suggests that discharge counseling by pharmacists is quite cost-effective and estimated to be cost saving in over 48% of cases. High-risk elderly patients appear to especially benefit from these pharmacist services.

  10. Systems Engineering Programmatic Estimation Using Technology Variance

    NASA Technical Reports Server (NTRS)

    Mog, Robert A.

    2000-01-01

    Unique and innovative system programmatic estimation is conducted using the variance of the packaged technologies. Covariance analysis is performed on the subsystems and components comprising the system of interest. Technological "return" and "variation" parameters are estimated. These parameters are combined with the model error to arrive at a measure of system development stability. The resulting estimates provide valuable information concerning the potential cost growth of the system under development.

  11. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Crawford, Aladsair J.; Viswanathan, Vilayanur V.; Stephenson, David E.

    A robust performance-based cost model is developed for all-vanadium, iron-vanadium and iron chromium redox flow batteries. Systems aspects such as shunt current losses, pumping losses and thermal management are accounted for. The objective function, set to minimize system cost, allows determination of stack design and operating parameters such as current density, flow rate and depth of discharge (DOD). Component costs obtained from vendors are used to calculate system costs for various time frames. A 2 kW stack data was used to estimate unit energy costs and compared with model estimates for the same size electrodes. The tool has been sharedmore » with the redox flow battery community to both validate their stack data and guide future direction.« less

  12. Shale Gas Boom or Bust? Estimating US and Global Economically Recoverable Resources

    NASA Astrophysics Data System (ADS)

    Brecha, R. J.; Hilaire, J.; Bauer, N.

    2014-12-01

    One of the most disruptive energy system technological developments of the past few decades is the rapid expansion of shale gas production in the United States. Because the changes have been so rapid there are great uncertainties as to the impacts of shale production for medium- and long-term energy and climate change mitigation policies. A necessary starting point for incorporating shale resources into modeling efforts is to understand the size of the resource, how much is technically recoverable (TRR), and finally, how much is economically recoverable (ERR) at a given cost. To assess production costs of shale gas, we combine top-down data with detailed bottom-up information. Studies solely based on top-down approaches do not adequately account for the heterogeneity of shale gas deposits and are unlikely to appropriately estimate extraction costs. We design an expedient bottom-up method based on publicly available US data to compute the levelized costs of shale gas extraction. Our results indicate the existence of economically attractive areas but also reveal a dramatic cost increase as lower-quality reservoirs are exploited. Extrapolating results for the US to the global level, our best estimate suggests that, at a cost of 6 US$/GJ, only 39% of the technically recoverable resources reported in top-down studies should be considered economically recoverable. This estimate increases to about 77% when considering optimistic TRR and estimated ultimate recovery parameters but could be lower than 12% for more pessimistic parameters. The current lack of information on the heterogeneity of shale gas deposits as well as on the development of future production technologies leads to significant uncertainties regarding recovery rates and production costs. Much of this uncertainty may be inherent, but for energy system planning purposes, with or without climate change mitigation policies, it is crucial to recognize the full ranges of recoverable quantities and costs.

  13. Household water use and conservation models using Monte Carlo techniques

    NASA Astrophysics Data System (ADS)

    Cahill, R.; Lund, J. R.; DeOreo, B.; Medellín-Azuara, J.

    2013-04-01

    The increased availability of water end use measurement studies allows for more mechanistic and detailed approaches to estimating household water demand and conservation potential. This study uses, probability distributions for parameters affecting water use estimated from end use studies and randomly sampled in Monte Carlo iterations to simulate water use in a single-family residential neighborhood. This model represents existing conditions and is calibrated to metered data. A two-stage mixed integer optimization model is then developed to estimate the least-cost combination of long- and short-term conservation actions for each household. This least-cost conservation model provides an estimate of the upper bound of reasonable conservation potential for varying pricing and rebate conditions. The models were adapted from previous work in Jordan and are applied to a neighborhood in San Ramon, California in eastern San Francisco Bay Area. The existing conditions model produces seasonal use results very close to the metered data. The least-cost conservation model suggests clothes washer rebates are among most cost-effective rebate programs for indoor uses. Retrofit of faucets and toilets is also cost effective and holds the highest potential for water savings from indoor uses. This mechanistic modeling approach can improve understanding of water demand and estimate cost-effectiveness of water conservation programs.

  14. Estimation of Damage Costs Associated with Flood Events

    NASA Astrophysics Data System (ADS)

    Andrews, T. A.; Wauthier, C.; Zipp, K.

    2017-12-01

    This study investigates the possibility of creating a mathematical function that enables the estimation of flood-damage costs. We begin by examining the costs associated with past flood events in the United States. The data on these tropical storms and hurricanes are provided by the National Oceanic and Atmospheric Administration. With the location, extent of flooding, and damage reparation costs identified, we analyze variables such as: number of inches rained, land elevation, type of landscape, region development in regards to building density and infrastructure, and population concentration. We seek to identify the leading drivers of high flood-damage costs and understand which variables play a large role in the costliness of these weather events. Upon completion of our mathematical analysis, we turn out attention to the 2017 natural disaster of Texas. We divide the region, as we did above, by land elevation, type of landscape, region development in regards to building density and infrastructure, and population concentration. Then, we overlay the number of inches rained in those regions onto the divided landscape and apply our function. We hope to use these findings to estimate the potential flood-damage costs of Hurricane Harvey. This information is then transformed into a hazard map that could provide citizens and businesses of flood-stricken zones additional resources for their insurance selection process.

  15. Preliminary Multivariable Cost Model for Space Telescopes

    NASA Technical Reports Server (NTRS)

    Stahl, H. Philip

    2010-01-01

    Parametric cost models are routinely used to plan missions, compare concepts and justify technology investments. Previously, the authors published two single variable cost models based on 19 flight missions. The current paper presents the development of a multi-variable space telescopes cost model. The validity of previously published models are tested. Cost estimating relationships which are and are not significant cost drivers are identified. And, interrelationships between variables are explored

  16. Minimum target prices for production of direct-acting antivirals and associated diagnostics to combat hepatitis C virus

    PubMed Central

    van de Ven, Nikolien; Fortunak, Joe; Simmons, Bryony; Ford, Nathan; Cooke, Graham S; Khoo, Saye; Hill, Andrew

    2015-01-01

    Combinations of direct-acting antivirals (DAAs) can cure hepatitis C virus (HCV) in the majority of treatment-naïve patients. Mass treatment programs to cure HCV in developing countries are only feasible if the costs of treatment and laboratory diagnostics are very low. This analysis aimed to estimate minimum costs of DAA treatment and associated diagnostic monitoring. Clinical trials of HCV DAAs were reviewed to identify combinations with consistently high rates of sustained virological response across hepatitis C genotypes. For each DAA, molecular structures, doses, treatment duration, and components of retrosynthesis were used to estimate costs of large-scale, generic production. Manufacturing costs per gram of DAA were based upon treating at least 5 million patients per year and a 40% margin for formulation. Costs of diagnostic support were estimated based on published minimum prices of genotyping, HCV antigen tests plus full blood count/clinical chemistry tests. Predicted minimum costs for 12-week courses of combination DAAs with the most consistent efficacy results were: US$122 per person for sofosbuvir+daclatasvir; US$152 for sofosbuvir+ribavirin; US$192 for sofosbuvir+ledipasvir; and US$115 for MK-8742+MK-5172. Diagnostic testing costs were estimated at US$90 for genotyping US$34 for two HCV antigen tests and US$22 for two full blood count/clinical chemistry tests. Conclusions: Minimum costs of treatment and diagnostics to cure hepatitis C virus infection were estimated at US$171-360 per person without genotyping or US$261-450 per person with genotyping. These cost estimates assume that existing large-scale treatment programs can be established. (Hepatology 2015;61:1174–1182) PMID:25482139

  17. Minimum target prices for production of direct-acting antivirals and associated diagnostics to combat hepatitis C virus.

    PubMed

    van de Ven, Nikolien; Fortunak, Joe; Simmons, Bryony; Ford, Nathan; Cooke, Graham S; Khoo, Saye; Hill, Andrew

    2015-04-01

    Combinations of direct-acting antivirals (DAAs) can cure hepatitis C virus (HCV) in the majority of treatment-naïve patients. Mass treatment programs to cure HCV in developing countries are only feasible if the costs of treatment and laboratory diagnostics are very low. This analysis aimed to estimate minimum costs of DAA treatment and associated diagnostic monitoring. Clinical trials of HCV DAAs were reviewed to identify combinations with consistently high rates of sustained virological response across hepatitis C genotypes. For each DAA, molecular structures, doses, treatment duration, and components of retrosynthesis were used to estimate costs of large-scale, generic production. Manufacturing costs per gram of DAA were based upon treating at least 5 million patients per year and a 40% margin for formulation. Costs of diagnostic support were estimated based on published minimum prices of genotyping, HCV antigen tests plus full blood count/clinical chemistry tests. Predicted minimum costs for 12-week courses of combination DAAs with the most consistent efficacy results were: US$122 per person for sofosbuvir+daclatasvir; US$152 for sofosbuvir+ribavirin; US$192 for sofosbuvir+ledipasvir; and US$115 for MK-8742+MK-5172. Diagnostic testing costs were estimated at US$90 for genotyping US$34 for two HCV antigen tests and US$22 for two full blood count/clinical chemistry tests. Minimum costs of treatment and diagnostics to cure hepatitis C virus infection were estimated at US$171-360 per person without genotyping or US$261-450 per person with genotyping. These cost estimates assume that existing large-scale treatment programs can be established. © 2014 The Authors. Hepatology published by Wiley Periodicals, Inc., on behalf of the American Association for the Study of Liver Diseases.

  18. Estimating the cost-effectiveness of vaccination against herpes zoster in England and Wales.

    PubMed

    van Hoek, A J; Gay, N; Melegaro, A; Opstelten, W; Edmunds, W J

    2009-02-25

    A live-attenuated vaccine against herpes zoster (HZ) has been approved for use, on the basis of a large-scale clinical trial that suggests that the vaccine is safe and efficacious. This study uses a Markov cohort model to estimate whether routine vaccination of the elderly (60+) would be cost-effective, when compared with other uses of health care resources. Vaccine efficacy parameters are estimated by fitting a model to clinical trial data. Estimates of QALY losses due to acute HZ and post-herpetic neuralgia were derived by fitting models to data on the duration of pain by severity and the QoL detriment associated with different severity categories, as reported in a number of different studies. Other parameters (such as cost and incidence estimates) were based on the literature, or UK data sources. The results suggest that vaccination of 65 year olds is likely to be cost-effective (base-case ICER=pound20,400 per QALY gained). If the vaccine does offer additional protection against either the severity of disease or the likelihood of developing PHN (as suggested by the clinical trial), then vaccination of all elderly age groups is highly likely to be deemed cost-effective. Vaccination at either 65 or 70 years (depending on assumptions of the vaccine action) is most cost-effective. Including a booster dose at a later age is unlikely to be cost-effective.

  19. Cost analysis of the Mercedes-Benz occupant detection system for air bag shut-off

    DOT National Transportation Integrated Search

    1997-04-01

    The objective of this project is to develop the variable manufacturing costs and lead time estimates of an "occupant detection system for air bag shut off". The Mercedes-Benz system was used as a base for developing this data. The system consists of ...

  20. 7 CFR 1822.263 - Definitions.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... agency of a State or local government. (c) Rural area is open country or rural places as defined in 7 CFR part 3550, subpart A. (d) Development cost means the cost of purchasing and developing the sites..., necessary equipment and estimated interest which the borrower cannot pay from other sources. (e) RHS section...

  1. Deep space network software cost estimation model

    NASA Technical Reports Server (NTRS)

    Tausworthe, R. C.

    1981-01-01

    A parametric software cost estimation model prepared for Deep Space Network (DSN) Data Systems implementation tasks is presented. The resource estimation model incorporates principles and data from a number of existing models. The model calibrates task magnitude and difficulty, development environment, and software technology effects through prompted responses to a set of approximately 50 questions. Parameters in the model are adjusted to fit DSN software life cycle statistics. The estimation model output scales a standard DSN Work Breakdown Structure skeleton, which is then input into a PERT/CPM system, producing a detailed schedule and resource budget for the project being planned.

  2. Harvesting costs for management planning for ponderosa pine plantations.

    Treesearch

    Roger D. Fight; Alex Gicqueau; Bruce R. Hartsough

    1999-01-01

    The PPHARVST computer application is Windows-based, public-domain software used to estimate harvesting costs for management planning for ponderosa pine (Pinus ponderosa Dougl. ex Laws.) plantations. The equipment production rates were developed from existing studies. Equipment cost rates were based on 1996 prices for new...

  3. Assessing the cost of a cardiology residency program with a cost construction model.

    PubMed

    Franzini, L; Chen, S C; McGhie, A I; Low, M D

    1999-09-01

    Although the total costs of graduate medical education are difficult to quantify, this information is of great importance in planning over the next decade. A cost construction model was used to quantify the costs of teaching faculty, cardiology fellows' salaries and benefits, overhead (physical plant, equipment, and support staff), and other costs associated with the cardiology residency program at the University of Texas-Houston during the 1996 to 1997 academic year. Surveys of cardiology faculty and fellows, checked by the program director, were conducted to determine the time spent in teaching activities; access to institutional and departmental financial records was obtained to quantify associated costs. The model was then developed and examined for a range of assumptions concerning cardiology fellows' productivity, replacement costs, and the cost allocation of activities jointly producing clinical care and education. The instructional cost of training (cost of didactic, direct clinical supervision, preparation for teaching, and teaching-related administration, plus the support of the teaching program) was estimated at $73,939 per cardiology fellow per year. This cost was less than the estimated replacement value of the teaching and clinical services provided by cardiology fellows, $100,937 per cardiology fellow per year. Sensitivity analysis, with different assumptions on cardiology fellows' productivity and replacement costs, varied the cost estimates but generally represented the cardiology residency program as an asset. Cost construction models can be used as a tool to estimate variations in resource requirements resulting from changes in curriculum or educators' costs. In this residency, the value of the teaching and clinical services provided by cardiology fellows exceeded the cost of the resources used in the educational program.

  4. Theory and Evidence of Switching Costs in the Market for College Textbooks

    ERIC Educational Resources Information Center

    McMahan, Chris

    2013-01-01

    This dissertation develops and estimates a model of switching costs in the market for college textbooks. First, in a theoretical setting, this paper characterizes the professor's adoption decision, which includes a trade-off between time and course quality. The professor faces a time cost when he switches textbooks. This switching cost leads…

  5. Use of travel cost models in planning: A case study

    Treesearch

    Allan Marsinko; William T. Zawacki; J. Michael Bowker

    2002-01-01

    This article examines the use of the travel cost, method in tourism-related decision making in the area of nonconsumptive wildlife-associated recreation. A travel cost model of nonconsumptive wildlife-associated recreation, developed by Zawacki, Maninko, and Bowker, is used as a case study for this analysis. The travel cost model estimates the demand for the activity...

  6. Users guide for FRCS: fuel reduction cost simulator software.

    Treesearch

    Roger D. Fight; Bruce R. Hartsough; Peter Noordijk

    2006-01-01

    The Fuel Reduction Cost Simulator (FRCS) spreadsheet application is public domain software used to estimate costs for fuel reduction treatments involving removal of trees of mixed sizes in the form of whole trees, logs, or chips from a forest. Equipment production rates were developed from existing studies. Equipment operating cost rates are from December 2002 prices...

  7. Consumer Vehicle Choice Model Documentation

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Liu, Changzheng; Greene, David L

    In response to the Fuel Economy and Greenhouse Gas (GHG) emissions standards, automobile manufacturers will need to adopt new technologies to improve the fuel economy of their vehicles and to reduce the overall GHG emissions of their fleets. The U.S. Environmental Protection Agency (EPA) has developed the Optimization Model for reducing GHGs from Automobiles (OMEGA) to estimate the costs and benefits of meeting GHG emission standards through different technology packages. However, the model does not simulate the impact that increased technology costs will have on vehicle sales or on consumer surplus. As the model documentation states, “While OMEGA incorporates functionsmore » which generally minimize the cost of meeting a specified carbon dioxide (CO2) target, it is not an economic simulation model which adjusts vehicle sales in response to the cost of the technology added to each vehicle.” Changes in the mix of vehicles sold, caused by the costs and benefits of added fuel economy technologies, could make it easier or more difficult for manufacturers to meet fuel economy and emissions standards, and impacts on consumer surplus could raise the costs or augment the benefits of the standards. Because the OMEGA model does not presently estimate such impacts, the EPA is investigating the feasibility of developing an adjunct to the OMEGA model to make such estimates. This project is an effort to develop and test a candidate model. The project statement of work spells out the key functional requirements for the new model.« less

  8. Bayesian hierarchical models for cost-effectiveness analyses that use data from cluster randomized trials.

    PubMed

    Grieve, Richard; Nixon, Richard; Thompson, Simon G

    2010-01-01

    Cost-effectiveness analyses (CEA) may be undertaken alongside cluster randomized trials (CRTs) where randomization is at the level of the cluster (for example, the hospital or primary care provider) rather than the individual. Costs (and outcomes) within clusters may be correlated so that the assumption made by standard bivariate regression models, that observations are independent, is incorrect. This study develops a flexible modeling framework to acknowledge the clustering in CEA that use CRTs. The authors extend previous Bayesian bivariate models for CEA of multicenter trials to recognize the specific form of clustering in CRTs. They develop new Bayesian hierarchical models (BHMs) that allow mean costs and outcomes, and also variances, to differ across clusters. They illustrate how each model can be applied using data from a large (1732 cases, 70 primary care providers) CRT evaluating alternative interventions for reducing postnatal depression. The analyses compare cost-effectiveness estimates from BHMs with standard bivariate regression models that ignore the data hierarchy. The BHMs show high levels of cost heterogeneity across clusters (intracluster correlation coefficient, 0.17). Compared with standard regression models, the BHMs yield substantially increased uncertainty surrounding the cost-effectiveness estimates, and altered point estimates. The authors conclude that ignoring clustering can lead to incorrect inferences. The BHMs that they present offer a flexible modeling framework that can be applied more generally to CEA that use CRTs.

  9. Cost-benefit analysis involving addictive goods: contingent valuation to estimate willingness-to-pay for smoking cessation.

    PubMed

    Weimer, David L; Vining, Aidan R; Thomas, Randall K

    2009-02-01

    The valuation of changes in consumption of addictive goods resulting from policy interventions presents a challenge for cost-benefit analysts. Consumer surplus losses from reduced consumption of addictive goods that are measured relative to market demand schedules overestimate the social cost of cessation interventions. This article seeks to show that consumer surplus losses measured using a non-addicted demand schedule provide a better assessment of social cost. Specifically, (1) it develops an addiction model that permits an estimate of the smoker's compensating variation for the elimination of addiction; (2) it employs a contingent valuation survey of current smokers to estimate their willingness-to-pay (WTP) for a treatment that would eliminate addiction; (3) it uses the estimate of WTP from the survey to calculate the fraction of consumer surplus that should be viewed as consumer value; and (4) it provides an estimate of this fraction. The exercise suggests that, as a tentative first and rough rule-of-thumb, only about 75% of the loss of the conventionally measured consumer surplus should be counted as social cost for policies that reduce the consumption of cigarettes. Additional research to estimate this important rule-of-thumb is desirable to address the various caveats relevant to this study. Copyright (c) 2008 John Wiley & Sons, Ltd.

  10. Feasibility study of an Integrated Program for Aerospace vehicle Design (IPAD). Volume 6: IPAD system development and operation

    NASA Technical Reports Server (NTRS)

    Redhed, D. D.; Tripp, L. L.; Kawaguchi, A. S.; Miller, R. E., Jr.

    1973-01-01

    The strategy of the IPAD implementation plan presented, proposes a three phase development of the IPAD system and technical modules, and the transfer of this capability from the development environment to the aerospace vehicle design environment. The system and technical module capabilities for each phase of development are described. The system and technical module programming languages are recommended as well as the initial host computer system hardware and operating system. The cost of developing the IPAD technology is estimated. A schedule displaying the flowtime required for each development task is given. A PERT chart gives the developmental relationships of each of the tasks and an estimate of the operational cost of the IPAD system is offered.

  11. Projected Costs of Informal Caregiving for Cardiovascular Disease: 2015 to 2035: A Policy Statement From the American Heart Association.

    PubMed

    Dunbar, Sandra B; Khavjou, Olga A; Bakas, Tamilyn; Hunt, Gail; Kirch, Rebecca A; Leib, Alyssa R; Morrison, R Sean; Poehler, Diana C; Roger, Veronique L; Whitsel, Laurie P

    2018-05-08

    In a recent report, the American Heart Association estimated that medical costs and productivity losses of cardiovascular disease (CVD) are expected to grow from $555 billion in 2015 to $1.1 trillion in 2035. Although the burden is significant, the estimate does not include the costs of family, informal, or unpaid caregiving provided to patients with CVD. In this analysis, we estimated projections of costs of informal caregiving attributable to CVD for 2015 to 2035. We used data from the 2014 Health and Retirement Survey to estimate hours of informal caregiving for individuals with CVD by age/sex/race using a zero-inflated binomial model and controlling for sociodemographic factors and health conditions. Costs of informal caregiving were estimated separately for hypertension, coronary heart disease, heart failure, stroke, and other heart disease. We analyzed data from a nationally representative sample of 16 731 noninstitutionalized adults ≥54 years of age. The value of caregiving hours was monetized by the use of home health aide workers' wages. The per-person costs were multiplied by census population counts to estimate nation-level costs and to be consistent with other American Heart Association analyses of burden of CVD, and the costs were projected from 2015 through 2035, assuming that within each age/sex/racial group, CVD prevalence and caregiving hours remain constant. The costs of informal caregiving for patients with CVD were estimated to be $61 billion in 2015 and are projected to increase to $128 billion in 2035. Costs of informal caregiving of patients with stroke constitute more than half of the total costs of CVD informal caregiving ($31 billion in 2015 and $66 billion in 2035). By age, costs are the highest among those 65 to 79 years of age in 2015 but are expected to be surpassed by costs among those ≥80 years of age by 2035. Costs of informal caregiving for patients with CVD represent an additional 11% of medical and productivity costs attributable to CVD. The burden of informal caregiving for patients with CVD is significant; accounting for these costs increases total CVD costs to $616 billion in 2015 and $1.2 trillion in 2035. These estimates have important research and policy implications, and they may be used to guide policy development to reduce the burden of CVD on patients and their caregivers. © 2018 American Heart Association, Inc.

  12. Computer-Aided Surgical Simulation in Head and Neck Reconstruction: A Cost Comparison among Traditional, In-House, and Commercial Options.

    PubMed

    Li, Sean S; Copeland-Halperin, Libby R; Kaminsky, Alexander J; Li, Jihui; Lodhi, Fahad K; Miraliakbari, Reza

    2018-06-01

     Computer-aided surgical simulation (CASS) has redefined surgery, improved precision and reduced the reliance on intraoperative trial-and-error manipulations. CASS is provided by third-party services; however, it may be cost-effective for some hospitals to develop in-house programs. This study provides the first cost analysis comparison among traditional (no CASS), commercial CASS, and in-house CASS for head and neck reconstruction.  The costs of three-dimensional (3D) pre-operative planning for mandibular and maxillary reconstructions were obtained from an in-house CASS program at our large tertiary care hospital in Northern Virginia, as well as a commercial provider (Synthes, Paoli, PA). A cost comparison was performed among these modalities and extrapolated in-house CASS costs were derived. The calculations were based on estimated CASS use with cost structures similar to our institution and sunk costs were amortized over 10 years.  Average operating room time was estimated at 10 hours, with an average of 2 hours saved with CASS. The hourly cost to the hospital for the operating room (including anesthesia and other ancillary costs) was estimated at $4,614/hour. Per case, traditional cases were $46,140, commercial CASS cases were $40,951, and in-house CASS cases were $38,212. Annual in-house CASS costs were $39,590.  CASS reduced operating room time, likely due to improved efficiency and accuracy. Our data demonstrate that hospitals with similar cost structure as ours, performing greater than 27 cases of 3D head and neck reconstructions per year can see a financial benefit from developing an in-house CASS program. Thieme Medical Publishers 333 Seventh Avenue, New York, NY 10001, USA.

  13. Economic Burden of Rheumatoid Arthritis in Italy: Possible Consequences on Anti-Citrullinated Protein Antibody-Positive Patients.

    PubMed

    Mennini, Francesco Saverio; Marcellusi, Andrea; Gitto, Lara; Iannone, Florenzo

    2017-04-01

    Rheumatoid arthritis (RA) is an autoimmune disease with a substantial medical and economic burden. In Italy, it affects approximately 280,000 people, therefore representing the musculoskeletal disease with the highest economic impact in terms of costs for the National Health Service and the social security system. The aim of this study was to estimate the annual economic burden of RA in Italy and determine the potential cost reduction considering the most effective biologic treatment for early rapidly progressing RA (ERPRA) patients. The model developed considers both direct costs that are mainly due to the pharmacological treatments, and indirect costs, which also include the productivity lost because of the disease. A systematic literature review provided the epidemiological and economic data used to inform the model. A one-way probabilistic sensitivity analysis based on 5000 Monte Carlo simulations was performed. Furthermore, specific scenario analyses were developed for those patients presenting an ERPRA, with the aim of evaluating the effectiveness of different biologic treatments for this subgroup of patients and estimating potential cost reduction. The total economic burden associated with RA was estimated to be €2.0 billion per year (95% confidence interval [CI] €1.8-2.3 billion). Forty-five percent of the expenditure was due to indirect costs (95% CI €0.8-1.0 billion); 45% depended on direct medical costs (95% CI €0.7-1.1 billion), and the residual 10% was determined by direct non-medical costs (95% CI €0.16-0.25 billion). In particular, the costs estimated for ERPRA patients totalled €76,171,181, of which approximately €18 million was associated with patients with a high level of anti-citrullinated protein antibodies (ACPA). The results of the analysis outline how it is possible to obtain a cost reduction for ERPRA patients of between €1 and €3 million by varying the number of patients with a high level of immunoglobulin G treated with the most effective biologic drug. In fact, the latter may determine higher efficacy outcomes, especially for poor prognostic ERPRA patients, ensuing higher levels of productivity. This study presents a pioneering approach to estimate the direct and indirect costs of RA. The model developed is a useful tool for policy makers as it allows to understand the economic implications of RA treatment in Italy, identify the most effective allocation of resources, and select the most appropriate treatment for ERPRA patients.

  14. Economic impact of Tegaderm chlorhexidine gluconate (CHG) dressing in critically ill patients.

    PubMed

    Thokala, Praveen; Arrowsmith, Martin; Poku, Edith; Martyn-St James, Marissa; Anderson, Jeff; Foster, Steve; Elliott, Tom; Whitehouse, Tony

    2016-09-01

    To estimate the economic impact of a Tegaderm TM chlorhexidine gluconate (CHG) gel dressing compared with a standard intravenous (i.v.) dressing (defined as non-antimicrobial transparent film dressing), used for insertion site care of short-term central venous and arterial catheters (intravascular catheters) in adult critical care patients using a cost-consequence model populated with data from published sources. A decision analytical cost-consequence model was developed which assigned each patient with an indwelling intravascular catheter and a standard dressing, a baseline risk of associated dermatitis, local infection at the catheter insertion site and catheter-related bloodstream infections (CRBSI), estimated from published secondary sources. The risks of these events for patients with a Tegaderm CHG were estimated by applying the effectiveness parameters from the clinical review to the baseline risks. Costs were accrued through costs of intervention (i.e. Tegaderm CHG or standard intravenous dressing) and hospital treatment costs depended on whether the patients had local dermatitis, local infection or CRBSI. Total costs were estimated as mean values of 10,000 probabilistic sensitivity analysis (PSA) runs. Tegaderm CHG resulted in an average cost-saving of £77 per patient in an intensive care unit. Tegaderm CHG also has a 98.5% probability of being cost-saving compared to standard i.v. dressings. The analyses suggest that Tegaderm CHG is a cost-saving strategy to reduce CRBSI and the results were robust to sensitivity analyses.

  15. Assessing the Potential Cost-Effectiveness of Microneedle Patches in Childhood Measles Vaccination Programs: The Case for Further Research and Development.

    PubMed

    Adhikari, Bishwa B; Goodson, James L; Chu, Susan Y; Rota, Paul A; Meltzer, Martin I

    2016-12-01

    Currently available measles vaccines are administered by subcutaneous injections and require reconstitution with a diluent and a cold chain, which is resource intensive and challenging to maintain. To overcome these challenges and potentially increase vaccination coverage, microneedle patches are being developed to deliver the measles vaccine. This study compares the cost-effectiveness of using microneedle patches with traditional vaccine delivery by syringe-and-needle (subcutaneous vaccination) in children's measles vaccination programs. We built a simple spreadsheet model to compute the vaccination costs for using microneedle patch and syringe-and-needle technologies. We assumed that microneedle vaccines will be, compared with current vaccines, more heat stable and require less expensive cool chains when used in the field. We used historical data on the incidence of measles among communities with low measles vaccination rates. The cost of microneedle vaccination was estimated at US$0.95 (range US$0.71-US$1.18) for the first dose, compared with US$1.65 (range US$1.24-US$2.06) for the first dose delivered by subcutaneous vaccination. At 95 % vaccination coverage, microneedle patch vaccination was estimated to cost US$1.66 per measles case averted (range US$1.24-US$2.07) compared with an estimated cost of US$2.64 per case averted (range US$1.98-US$3.30) using subcutaneous vaccination. Use of microneedle patches may reduce costs; however, the cost-effectiveness of patches would depend on the vaccine recipients' acceptability and vaccine effectiveness of the patches relative to the existing conventional vaccine-delivery method. This study emphasizes the need to continue research and development of this vaccine-delivery method that could boost measles elimination efforts through improved access to vaccines and increased vaccination coverage.

  16. Man power/cost estimation model: Automated planetary projects

    NASA Technical Reports Server (NTRS)

    Kitchen, L. D.

    1975-01-01

    A manpower/cost estimation model is developed which is based on a detailed level of financial analysis of over 30 million raw data points which are then compacted by more than three orders of magnitude to the level at which the model is applicable. The major parameter of expenditure is manpower (specifically direct labor hours) for all spacecraft subsystem and technical support categories. The resultant model is able to provide a mean absolute error of less than fifteen percent for the eight programs comprising the model data base. The model includes cost saving inheritance factors, broken down in four levels, for estimating follow-on type programs where hardware and design inheritance are evident or expected.

  17. Applications systems verification and transfer project. Volume 7: Cost/benefit analysis for the ASVT on operational applications of satellite snow-cover observations

    NASA Technical Reports Server (NTRS)

    Castruccio, P.; Loats, H.; Lloyd, D.; Newman, P.

    1981-01-01

    The results of the OASSO ASVT's were used to estimate the benefits accruing from the added information available from satellite snowcover area measurement. Estimates of the improvement in runoff prediction due to addition of SATSCAM were made by the Colorado ASVT personnel. The improvement estimate is 6-10%. Data were applied to subregions covering the Western States snow area amended by information from the ASVT and other watershed experts to exclude areas which are not impacted by snowmelt runoff. Benefit models were developed for irrigation and hydroenergy uses. The benefit/cost ratio is 72:1. Since only two major benefit contributors were used and since the forecast improvement estimate does not take into account future satellite capabilities these estimates are considered to be conservative. The large magnitude of the benefit/cost ratio supports the utility and applicability of SATSCAM.

  18. A study of the cost-effective markets for new technology agricultural aircraft

    NASA Technical Reports Server (NTRS)

    Hazelrigg, G. A., Jr.; Clyne, F.

    1979-01-01

    A previously developed data base was used to estimate the regional and total U.S. cost-effective markets for a new technology agricultural aircraft as incorporating features which could result from NASA-sponsored aerial applications research. The results show that the long-term market penetration of a new technology aircraft would be near 3,000 aircraft. This market penetration would be attained in approximately 20 years. Annual sales would be about 200 aircraft after 5 to 6 years of introduction. The net present value of cost savings benefit which this aircraft would yield (measured on an infinite horizon basis) would be about $35 million counted at a 10 percent discount rate and $120 million at a 5 percent discount rate. At both discount rates the present value of cost savings exceeds the present value of research and development (R&D) costs estimated for the development of the technology base needed for the proposed aircraft. These results are quite conservative as they have been derived neglecting future growth in the agricultural aviation industry, which has been averaging about 12 percent per year over the past several years.

  19. The cost of atrial fibrillation in Italy: a five-year analysis of healthcare expenditure in the general population. From the Italian Survey of Atrial Fibrillation Management (ISAF) study.

    PubMed

    Zoni Berisso, M; Landolina, M; Ermini, G; Parretti, D; Zingarini, G L; Degli Esposti, L; Cricelli, C; Boriani, G

    2017-01-01

    Atrial fibrillation (AF) is a relevant item of expenditure for the National Healthcare systems. The aim of the study was to estimate the annual costs of AF in Italy. The Italian Survey of Atrial Fibrillation Management Study enrolled 6.036 patients with AF among 295.906 subjects representative of the Italian population. Data were collected by 233 General Practitioners (GPs) distributed across Italy. Quantities of resources used during the 5 years preceding the ISAF screening were inferred from the survey data and multiplied by the current Italian unit costs of 2015 in order to estimate the mean per patient annual cumulative cost of AF. Patients were subdivided on the basis of the number of hospitalizations, invasive/non-invasive diagnostic tests and invasive therapeutic procedures in 3 different clinical subsets: "low cost", " medium cost" and "high cost clinical scenario". The estimated mean costs per patient per year were 613 €, 891 € and 1213 € for the "Low cost", "Medium cost" and "High Cost Clinical Scenario" respectively. Hospitalizations and inpatient interventional procedures accounted for more than 80% of the cumulative annual costs. The mean annual costs among patients pursuing "Rhythm control" strategy was 956 €. In Italy, the estimated costs of AF per patient per year are lower than those reported in other developed countries and vary widely related to the different characteristics of AF patients. Hospitalizations and interventional procedures are the main drivers of costs. The mean annual cost of AF is mainly influenced by the duration of the period of observation and the patients' characteristics. Measures to reduce hospitalizations are needed.

  20. The economics of treatment for infants with respiratory distress syndrome.

    PubMed

    Neil, N; Sullivan, S D; Lessler, D S

    1998-01-01

    To define clinical outcomes and prevailing patterns of care for the initial hospitalization of infants at greatest risk for respiratory distress syndrome (RDS); to estimate direct medical care costs associated with the initial hospitalization; and to introduce and demonstrate a simulation technique for the economic evaluation of health care technologies. Clinical outcomes and usual-care algorithms were determined for infants with RDS in three birthweight categories (500-1,000g; >1,000-1,500g; and >1,500g) using literature- and expert-panel-based data. The experts were practitioners from major U.S. hospitals who were directly involved in the clinical care of such infants. Using the framework derived from the usual care patterns and outcomes, the authors developed an itemized "micro-costing" economic model to simulate the costs associated with the initial hospitalization of a hypothetical RDS patient. The model is computerized and dynamic; unit costs, frequencies, number of days, probabilities and population multipliers are all variable and can be modified on the basis of new information or local conditions. Aggregated unit costs are used to estimate the expected medical costs of treatment per patient. Expected costs of initial hospitalization per uncomplicated surviving infant with RDS were estimated to be $101,867 for 500-1,000g infants; $64,524 for >1,000-1,500g infants; and $27,224 for >1,500g infants. Incremental costs of complications among survivors were estimated to be $22,155 (500-1,000g); $11,041 (>1,000-1,500g); and $2,448 (>1,500 g). Expected costs of initial hospitalization per case (including non-survivors) were $100,603; $72,353; and $28,756, respectively. An itemized model such as the one developed here serves as a benchmark for the economic assessment of treatment costs and utilization. Moreover, it offers a powerful tool for the prospective evaluation of new technologies or procedures designed to reduce the incidence of, severity of, and/or total hospital resource use ascribed to RDS.

  1. An Exploratory Study of Cost Engineering in Axiomatic Design: Creation of the Cost Model Based on an FR-DP Map

    NASA Technical Reports Server (NTRS)

    Lee, Taesik; Jeziorek, Peter

    2004-01-01

    Large complex projects cost large sums of money throughout their life cycle for a variety of reasons and causes. For such large programs, the credible estimation of the project cost, a quick assessment of the cost of making changes, and the management of the project budget with effective cost reduction determine the viability of the project. Cost engineering that deals with these issues requires a rigorous method and systematic processes. This paper introduces a logical framework to a&e effective cost engineering. The framework is built upon Axiomatic Design process. The structure in the Axiomatic Design process provides a good foundation to closely tie engineering design and cost information together. The cost framework presented in this paper is a systematic link between the functional domain (FRs), physical domain (DPs), cost domain (CUs), and a task/process-based model. The FR-DP map relates a system s functional requirements to design solutions across all levels and branches of the decomposition hierarchy. DPs are mapped into CUs, which provides a means to estimate the cost of design solutions - DPs - from the cost of the physical entities in the system - CUs. The task/process model describes the iterative process ot-developing each of the CUs, and is used to estimate the cost of CUs. By linking the four domains, this framework provides a superior traceability from requirements to cost information.

  2. Operations and support cost modeling using Markov chains

    NASA Technical Reports Server (NTRS)

    Unal, Resit

    1989-01-01

    Systems for future missions will be selected with life cycle costs (LCC) as a primary evaluation criterion. This reflects the current realization that only systems which are considered affordable will be built in the future due to the national budget constaints. Such an environment calls for innovative cost modeling techniques which address all of the phases a space system goes through during its life cycle, namely: design and development, fabrication, operations and support; and retirement. A significant portion of the LCC for reusable systems are generated during the operations and support phase (OS). Typically, OS costs can account for 60 to 80 percent of the total LCC. Clearly, OS costs are wholly determined or at least strongly influenced by decisions made during the design and development phases of the project. As a result OS costs need to be considered and estimated early in the conceptual phase. To be effective, an OS cost estimating model needs to account for actual instead of ideal processes by associating cost elements with probabilities. One approach that may be suitable for OS cost modeling is the use of the Markov Chain Process. Markov chains are an important method of probabilistic analysis for operations research analysts but they are rarely used for life cycle cost analysis. This research effort evaluates the use of Markov Chains in LCC analysis by developing OS cost model for a hypothetical reusable space transportation vehicle (HSTV) and suggests further uses of the Markov Chain process as a design-aid tool.

  3. Comparative analysis for various redox flow batteries chemistries using a cost performance model

    NASA Astrophysics Data System (ADS)

    Crawford, Alasdair; Viswanathan, Vilayanur; Stephenson, David; Wang, Wei; Thomsen, Edwin; Reed, David; Li, Bin; Balducci, Patrick; Kintner-Meyer, Michael; Sprenkle, Vincent

    2015-10-01

    The total energy storage system cost is determined by means of a robust performance-based cost model for multiple flow battery chemistries. Systems aspects such as shunt current losses, pumping losses and various flow patterns through electrodes are accounted for. The system cost minimizing objective function determines stack design by optimizing the state of charge operating range, along with current density and current-normalized flow. The model cost estimates are validated using 2-kW stack performance data for the same size electrodes and operating conditions. Using our validated tool, it has been demonstrated that an optimized all-vanadium system has an estimated system cost of < 350 kWh-1 for 4-h application. With an anticipated decrease in component costs facilitated by economies of scale from larger production volumes, coupled with performance improvements enabled by technology development, the system cost is expected to decrease to 160 kWh-1 for a 4-h application, and to 100 kWh-1 for a 10-h application. This tool has been shared with the redox flow battery community to enable cost estimation using their stack data and guide future direction.

  4. Economic burden of moderate to severe plaque psoriasis in Canada.

    PubMed

    Levy, Adrian R; Davie, Alison M; Brazier, Nicole C; Jivraj, Farah; Albrecht, Lorne E; Gratton, David; Lynde, Charles W

    2012-12-01

    Psoriasis is a chronic debilitating disease affecting approximately one million Canadians. The objective of this study is to estimate the economic burden in $CDN (2008) of moderate to severe plaque psoriasis among Canadian adults. Using a cross-sectional design, direct resource use, costs, lost productivity, and quality of life were obtained for 90 subjects diagnosed with psoriasis in three dermatology clinics in British Columbia, Ontario, and Québec. An Excel-based economic model was developed to project the annual cost of psoriasis, from the societal perspective. The estimated mean annual cost of psoriasis was $7999/subject (95% CI: $3563-$12,434) with direct costs accounting for 57%. Mean lost productivity costs, which accounted for 43% of the mean annual costs of psoriasis, were $3442/subject (95% CI: $1293-$5590). Projecting the mean costs per patient to the afflicted population yields an estimated total annual cost of $1.7 billion (95% CI: $0.8-$2.6 billion) attributable to moderate to severe psoriasis in Canada. Understanding the interplay between direct costs, lost productivity, and quality of life is critical for accurately identifying and evaluating effective treatments for this disease. © 2012 The International Society of Dermatology.

  5. A cost simulation for mammography examinations taking into account equipment failures and resource utilization characteristics.

    PubMed

    Coelli, Fernando C; Almeida, Renan M V R; Pereira, Wagner C A

    2010-12-01

    This work develops a cost analysis estimation for a mammography clinic, taking into account resource utilization and equipment failure rates. Two standard clinic models were simulated, the first with one mammography equipment, two technicians and one doctor, and the second (based on an actually functioning clinic) with two equipments, three technicians and one doctor. Cost data and model parameters were obtained by direct measurements, literature reviews and other hospital data. A discrete-event simulation model was developed, in order to estimate the unit cost (total costs/number of examinations in a defined period) of mammography examinations at those clinics. The cost analysis considered simulated changes in resource utilization rates and in examination failure probabilities (failures on the image acquisition system). In addition, a sensitivity analysis was performed, taking into account changes in the probabilities of equipment failure types. For the two clinic configurations, the estimated mammography unit costs were, respectively, US$ 41.31 and US$ 53.46 in the absence of examination failures. As the examination failures increased up to 10% of total examinations, unit costs approached US$ 54.53 and US$ 53.95, respectively. The sensitivity analysis showed that type 3 (the most serious) failure increases had a very large impact on the patient attendance, up to the point of actually making attendance unfeasible. Discrete-event simulation allowed for the definition of the more efficient clinic, contingent on the expected prevalence of resource utilization and equipment failures. © 2010 Blackwell Publishing Ltd.

  6. Costs of Juvenile Violence: Policy Implications.

    ERIC Educational Resources Information Center

    Miller, Ted; Fisher, Deborah A.; Cohen, Mark A.

    2001-01-01

    Investigated the magnitude of juvenile violence in Pennsylvania in terms of victimization and perpetration. Used archival data on violent crimes in Pennsylvania during 1993 to develop cost estimates reflecting the costs incurred by society for both victims and perpetrators. Overall, violence against children and adolescents proved to be a much…

  7. Airport costs and production technology : a translog cost function analysis with implications for economic development.

    DOT National Transportation Integrated Search

    2011-07-01

    Based upon 50 large and medium hub airports over a 13 year period, this research estimates one and two : output translog models of airport short run operating costs. Output is passengers transported on non-stop : segments and pounds of cargo shipped....

  8. Airport costs and production technology : a translog cost function analysis with implications for economic development.

    DOT National Transportation Integrated Search

    2011-12-01

    Based upon 50 large and medium hub airports over a 13 year period, this research estimates one and two : output translog models of airport short run operating costs. Output is passengers transported on non-stop : segments and pounds of cargo shipped....

  9. 14 CFR 151.61 - Grant payments: Partial.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... payments: Partial. (a) Subject to the final determination of allowable project costs as provided in § 151.63 partial grant payments for project costs may be made to a sponsor upon application. Unless... partial payments to the estimated United States share of the project costs of the airport development...

  10. 14 CFR 151.61 - Grant payments: Partial.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... payments: Partial. (a) Subject to the final determination of allowable project costs as provided in § 151.63 partial grant payments for project costs may be made to a sponsor upon application. Unless... partial payments to the estimated United States share of the project costs of the airport development...

  11. 14 CFR 151.61 - Grant payments: Partial.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... payments: Partial. (a) Subject to the final determination of allowable project costs as provided in § 151.63 partial grant payments for project costs may be made to a sponsor upon application. Unless... partial payments to the estimated United States share of the project costs of the airport development...

  12. 33 CFR 241.5 - Procedures for estimating the alternative cost-share.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... THE ARMY, DEPARTMENT OF DEFENSE FLOOD CONTROL COST-SHARING REQUIREMENTS UNDER THE ABILITY TO PAY.... Determine the maximum possible reduction in the level of non-Federal cost-sharing for any project. (1) Calculate the ratio of flood control benefits (developed using the Water Resources Council's Principles and...

  13. 33 CFR 241.5 - Procedures for estimating the alternative cost-share.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... THE ARMY, DEPARTMENT OF DEFENSE FLOOD CONTROL COST-SHARING REQUIREMENTS UNDER THE ABILITY TO PAY.... Determine the maximum possible reduction in the level of non-Federal cost-sharing for any project. (1) Calculate the ratio of flood control benefits (developed using the Water Resources Council's Principles and...

  14. 33 CFR 241.5 - Procedures for estimating the alternative cost-share.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... THE ARMY, DEPARTMENT OF DEFENSE FLOOD CONTROL COST-SHARING REQUIREMENTS UNDER THE ABILITY TO PAY.... Determine the maximum possible reduction in the level of non-Federal cost-sharing for any project. (1) Calculate the ratio of flood control benefits (developed using the Water Resources Council's Principles and...

  15. 33 CFR 241.5 - Procedures for estimating the alternative cost-share.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... THE ARMY, DEPARTMENT OF DEFENSE FLOOD CONTROL COST-SHARING REQUIREMENTS UNDER THE ABILITY TO PAY.... Determine the maximum possible reduction in the level of non-Federal cost-sharing for any project. (1) Calculate the ratio of flood control benefits (developed using the Water Resources Council's Principles and...

  16. 33 CFR 241.5 - Procedures for estimating the alternative cost-share.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... THE ARMY, DEPARTMENT OF DEFENSE FLOOD CONTROL COST-SHARING REQUIREMENTS UNDER THE ABILITY TO PAY.... Determine the maximum possible reduction in the level of non-Federal cost-sharing for any project. (1) Calculate the ratio of flood control benefits (developed using the Water Resources Council's Principles and...

  17. Fuzzy/Neural Software Estimates Costs of Rocket-Engine Tests

    NASA Technical Reports Server (NTRS)

    Douglas, Freddie; Bourgeois, Edit Kaminsky

    2005-01-01

    The Highly Accurate Cost Estimating Model (HACEM) is a software system for estimating the costs of testing rocket engines and components at Stennis Space Center. HACEM is built on a foundation of adaptive-network-based fuzzy inference systems (ANFIS) a hybrid software concept that combines the adaptive capabilities of neural networks with the ease of development and additional benefits of fuzzy-logic-based systems. In ANFIS, fuzzy inference systems are trained by use of neural networks. HACEM includes selectable subsystems that utilize various numbers and types of inputs, various numbers of fuzzy membership functions, and various input-preprocessing techniques. The inputs to HACEM are parameters of specific tests or series of tests. These parameters include test type (component or engine test), number and duration of tests, and thrust level(s) (in the case of engine tests). The ANFIS in HACEM are trained by use of sets of these parameters, along with costs of past tests. Thereafter, the user feeds HACEM a simple input text file that contains the parameters of a planned test or series of tests, the user selects the desired HACEM subsystem, and the subsystem processes the parameters into an estimate of cost(s).

  18. Estimating health benefits and cost-savings for achieving the Healthy People 2020 objective of reducing invasive colorectal cancer.

    PubMed

    Hung, Mei-Chuan; Ekwueme, Donatus U; White, Arica; Rim, Sun Hee; King, Jessica B; Wang, Jung-Der; Chang, Su-Hsin

    2018-01-01

    This study aims to quantify the aggregate potential life-years (LYs) saved and healthcare cost-savings if the Healthy People 2020 objective were met to reduce invasive colorectal cancer (CRC) incidence by 15%. We identified patients (n=886,380) diagnosed with invasive CRC between 2001 and 2011 from a nationally representative cancer dataset. We stratified these patients by sex, race/ethnicity, and age. Using these data and data from the 2001-2011 U.S. life tables, we estimated a survival function for each CRC group and the corresponding reference group and computed per-person LYs saved. We estimated per-person annual healthcare cost-savings using the 2008-2012 Medical Expenditure Panel Survey. We calculated aggregate LYs saved and cost-savings by multiplying the reduced number of CRC patients by the per-person LYs saved and lifetime healthcare cost-savings, respectively. We estimated an aggregate of 84,569 and 64,924 LYs saved for men and women, respectively, accounting for healthcare cost-savings of $329.3 and $294.2 million (in 2013$), respectively. Per person, we estimated 6.3 potential LYs saved related to those who developed CRC for both men and women, and healthcare cost-savings of $24,000 for men and $28,000 for women. Non-Hispanic whites and those aged 60-64 had the highest aggregate potential LYs saved and cost-savings. Achieving the HP2020 objective of reducing invasive CRC incidence by 15% by year 2020 would potentially save nearly 150,000 life-years and $624 million on healthcare costs. Copyright © 2017. Published by Elsevier Inc.

  19. Estimating the costs of landslide damage in the United States

    USGS Publications Warehouse

    Fleming, Robert W.; Taylor, Fred A.

    1980-01-01

    Landslide damages are one of the most costly natural disasters in the United States. A recent estimate of the total annual cost of landslide damage is in excess of $1 billion {Schuster, 1978}. The damages can be significantly reduced, however, through the combined action of technical experts, government, and the public. Before they can be expected to take action, local governments need to have an appreciation of costs of damage in their areas of responsibility and of the reductions in losses that can be achieved. Where studies of cost of landslide damages have been conducted, it is apparent that {1} costs to the public and private sectors of our economy due to landslide damage are much larger than anticipated; {2} taxpayers and public officials generally are unaware of the magnitude of the cost, owing perhaps to the lack of any centralization of data; and {3} incomplete records and unavailability of records result in lower reported costs than actually were incurred. The U.S. Geological Survey has developed a method to estimate the cost of landslide damages in regional and local areas and has applied the method in three urban areas and one rural area. Costs are for different periods and are unadjusted for inflation; therefore, strict comparisons of data from different years should be avoided. Estimates of the average annual cost of landslide damage for the urban areas studied are $5,900,000 in the San Francisco Bay area; $4,000,000 in Allegheny County, Pa.; and $5,170,000 in Hamilton County, Ohio. Adjusting these figures for the population of each area, the annual cost of damages per capita are $1.30 in the nine-county San Francisco Bay region; $2.50 in Allegheny County, Pa.; and $5.80 in Hamilton County, Ohio. On the basis of data from other sources, the estimated annual damages on a per capita basis for the City of Los Angeles, Calif., are about $1.60. If the costs were available for the damages from landslides in Los Angeles in 1977-78 and 1979-80, the annual per capita costs probably would be much larger. The landslide near the rural community of Manti, Utah, caused an expenditure of about $1,800,000 or about $1,000 per person during the period 1974-76. Because a recurrence for such a landslide cannot be established, it is not possible to develop a meaningful estimate of annual per capita damages. Communities are urged to examine their costs of landslide damage and to evaluate the feasibility of several alternative programs that, for a modest investment, could significantly reduce these losses.

  20. Materials experiment carrier concepts definition study. Volume 3: Programmatics, part 2

    NASA Technical Reports Server (NTRS)

    1981-01-01

    Project logic, schedule and funding information was derived to enable decisions to be made regarding implementation of MEC system development. A master schedule and cost and price estimates (ROM) were developed for a project that consists of development of an all-up MEC, its integration with payloads and its flight on one 90 day mission. In Part 2 of the study a simple initial MEC was defined to accommodate three MPS baseline payloads. The design of this initial MEC is illustrated. The project logic, detailed schedules, and ROM cost estimate relate to a project in which this initial MEC is developed, integrated with payloads and flown once for 180 days.