Sample records for development deployment operation

  1. Development of a Rapidly Deployable Special Operations Component Command (SOCC) Core Concept for the North Atlantic Treaty Organization (NATO) Special Operations Headquarters (NSHQ)

    DTIC Science & Technology

    2011-12-01

    operating in their territory. NSHQ is a new and evolving organization, which was instructed to develop a rapidly deployable HQ. NSHQ receives its...single overarching concept, eliminating redundancy, and integrates new deployable operational C2 structures (notably NSHQ) agreed through the...of the command and control issue is the ability to communicate effectively both up and down the chain of command. With the new technologies

  2. The United States Army’s Full-Spectrum Training Strategy Challenge

    DTIC Science & Technology

    2012-05-17

    the high operational tempo for deployed and deploying units. Soldiers and units conducted repeat deployments to both Iraq and Afghanistan with little...prevalent in Strategic Operational Design and associated variations of design. Further complicating Israeli ideas of warfare was the notion that...Army to develop an overarching operational framework that finally replaces Airland Battle, like EBO or some variation of operational design. But one

  3. Prototype development and demonstration for integrated dynamic transit operations.

    DOT National Transportation Integrated Search

    2016-01-01

    This document serves as the Final Report specific to the Integrated Dynamic Transit Operations (IDTO) Prototype Development and Deployment Project, hereafter referred to as IDTO Prototype Deployment or IDTO PD project. This project was performed unde...

  4. USDOT guidance summary for connected vehicle pilot site deployments: security operational concept : final report.

    DOT National Transportation Integrated Search

    2016-07-01

    This document provides guidance material in regards to security for the CV Pilots Deployment Concept Development Phase. An approach for developing the security operational concept is presented based on identifying the impacts of security breaches reg...

  5. Operational Concepts for a Generic Space Exploration Communication Network Architecture

    NASA Technical Reports Server (NTRS)

    Ivancic, William D.; Vaden, Karl R.; Jones, Robert E.; Roberts, Anthony M.

    2015-01-01

    This document is one of three. It describes the Operational Concept (OpsCon) for a generic space exploration communication architecture. The purpose of this particular document is to identify communication flows and data types. Two other documents accompany this document, a security policy profile and a communication architecture document. The operational concepts should be read first followed by the security policy profile and then the architecture document. The overall goal is to design a generic space exploration communication network architecture that is affordable, deployable, maintainable, securable, evolvable, reliable, and adaptable. The architecture should also require limited reconfiguration throughout system development and deployment. System deployment includes: subsystem development in a factory setting, system integration in a laboratory setting, launch preparation, launch, and deployment and operation in space.

  6. Connected Vehicle Pilot Deployment Program Phase 2 : Comprehensive Maintenance and Operations Plan - New York City

    DOT National Transportation Integrated Search

    2018-05-31

    This Comprehensive Maintenance and Operations Plan (CMOP) describes the types and number of equipment to be operated and maintained for the proposed New York City (NYC) Connected Vehicle Pilot Deployment (CVPD) system. Its objective is to develop a p...

  7. Deployer Performance Results for the TSS-1 Mission

    NASA Technical Reports Server (NTRS)

    Marshall, Leland S.; Geiger, Ronald V.

    1995-01-01

    Performance of the Tethered Satellite System (TSS) Deployer during the STS-46 mission (July and August 1992) is analyzed in terms of hardware operation at the component and system level. Although only a limited deployment of the satellite was achieved (256 meters vs 20 kilometers planned), the mission served to verify the basic capability of the Deployer to release, control and retrieve a tethered satellite. - Deployer operational flexibility that was demonstrated during the flight is also addressed. Martin Marietta was the prime contractor for the development of the Deployer, under management of the NASA George C. Marshall Space Flight Center (MSFC). The satellite was provided by Alenia, Torino, Italy under contract to the Agencia Spaziale Italiana (ASI). Proper operation of the avionics components and the majority of mechanisms was observed during the flight. System operations driven by control laws for the deployment and retrieval of the satellite were also successful for the limited deployment distance. Anomalies included separation problems for one of the two umbilical connectors between the Deployer and satellite, tether jamming (at initial Satellite fly-away and at a deployment distance of 224 meters), and a mechanical interference which prevented tether deployment beyond 256 meters. The Deployer was used in several off-nominal conditions to respond to these anomalies, which ultimately enabled a successful satellite retrieval and preservation of hardware integrity for a future re-flight. The paper begins with an introduction defining the significance of the TSS-1 mission. The body of the paper is divided into four major sections: (1) Description of Deployer System and Components, (2) Deployer Components/Systems Demonstrating Successful Operation, (3) Hardware Anomalies and Operational Responses, and (4) Design Modifications for the TSS-1R Re-flight Mission. Conclusions from the TSS-1 mission, including lessons learned are presented at the end of the manuscript.

  8. The Development and Deployment of a Virtual Unit Operations Laboratory

    ERIC Educational Resources Information Center

    Vaidyanath, Sreeram; Williams, Jason; Hilliard, Marcus; Wiesner, Theodore

    2007-01-01

    Computer-simulated experiments offer many benefits to engineering curricula in the areas of safety, cost, and flexibility. We report our experience in developing and deploying a computer-simulated unit operations laboratory, driven by the guiding principle of maximum fidelity to the physical lab. We find that, while the up-front investment in…

  9. Ocean Thermal Energy Conversion (OTEC) Programmatic Environmental Analysis--Appendices

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Authors, Various

    1980-01-01

    The programmatic environmental analysis is an initial assessment of Ocean Thermal Energy Conversion (OTEC) technology considering development, demonstration and commercialization. It is concluded that the OTEC development program should continue because the development, demonstration, and commercialization on a single-plant deployment basis should not present significant environmental impacts. However, several areas within the OTEC program require further investigation in order to assess the potential for environmental impacts from OTEC operation, particularly in large-scale deployments and in defining alternatives to closed-cycle biofouling control: (1) Larger-scale deployments of OTEC clusters or parks require further investigations in order to assess optimal platform siting distancesmore » necessary to minimize adverse environmental impacts. (2) The deployment and operation of the preoperational platform (OTEC-1) and future demonstration platforms must be carefully monitored to refine environmental assessment predictions, and to provide design modifications which may mitigate or reduce environmental impacts for larger-scale operations. These platforms will provide a valuable opportunity to fully evaluate the intake and discharge configurations, biofouling control methods, and both short-term and long-term environmental effects associated with platform operations. (3) Successful development of OTEC technology to use the maximal resource capabilities and to minimize environmental effects will require a concerted environmental management program, encompassing many different disciplines and environmental specialties. This volume contains these appendices: Appendix A -- Deployment Scenario; Appendix B -- OTEC Regional Characterization; and Appendix C -- Impact and Related Calculations.« less

  10. USDOT guidance summary for connected vehicle deployments : concept of operations and the CVRIA/SET-IT tool.

    DOT National Transportation Integrated Search

    2016-07-01

    This document provides guidance material in regards to the Concept of Operations for the CV Pilots DeploymentConcept Development Phase. Methods for system engineering are discussed in depth with definitions for thesuccessful management of each aspect...

  11. Military deployment and reintegration: a systematic review of child coping.

    PubMed

    Bello-Utu, Cindy F; DeSocio, Janiece E

    2015-02-01

    Child coping with parent military deployment and family reintegration. A systematic review of research literature was conducted to examine the effects of deployment and family reintegration on children in military families. A search of CINAHL, PubMed, Psyc-INFO, and SocINDEX databases was performed using the terms "military family," "military child," "child coping," "deployment," and "reintegration." The search was limited to publications between 2001 and 2014 to focus on the effects of Operation Enduring Freedom (OEF), Operation Iraqi Freedom (OIF), and Operation New Dawn (OND). Twenty-seven research reports met inclusion criteria. Three themes were extracted: A child's coping is influenced by (a) the child's age and development, (b) the mental health and coping of the non-deployed parent during deployment, and the mental health of both parents during family reintegration, and (c) the pre-existing resilience/vulnerability, cumulative risks, and resources of the child and family. © 2015 Wiley Periodicals, Inc.

  12. Psychological intervention in the Spanish military deployed on international operations.

    PubMed

    Martínez-Sánchez, Juan A

    2014-05-01

    Spain was one of the first countries to recognize the importance of psychological aspects in the planning and development of international military operations, and also to include military psychologists in contingents deployed abroad. This paper describes the psychological intervention model used by Spanish military psychologists involved in military operations abroad. This model is comprised of a systematic set of interventions and actions carried out in the different phases of any military operation (concentration, deployment and post-mission). It also contemplates the intervention not only in personnel who integrate the military contingents, but also with their families and, at certain times of the mission, with the local population of the area in which the operation is carried out. The model presented has a preventive orientation, based on the selection and psychological preparation of contingents before deployment, and supplemented by support in the area of operations for personnel who need it, and the psychological care of their families in Spain. Whereas this model has been effective so far, in this work, we present a series of measures aimed at improving the psychological well-being of our troops deployed outside our country.

  13. Security Policy for a Generic Space Exploration Communication Network Architecture

    NASA Technical Reports Server (NTRS)

    Ivancic, William D.; Sheehe, Charles J.; Vaden, Karl R.

    2016-01-01

    This document is one of three. It describes various security mechanisms and a security policy profile for a generic space-based communication architecture. Two other documents accompany this document- an Operations Concept (OpsCon) and a communication architecture document. The OpsCon should be read first followed by the security policy profile described by this document and then the architecture document. The overall goal is to design a generic space exploration communication network architecture that is affordable, deployable, maintainable, securable, evolvable, reliable, and adaptable. The architecture should also require limited reconfiguration throughout system development and deployment. System deployment includes subsystem development in a factory setting, system integration in a laboratory setting, launch preparation, launch, and deployment and operation in space.

  14. Autonomous Adaptive Low-Power Instrument Platform (AAL-PIP) for remote high latitude geospace data collection

    NASA Astrophysics Data System (ADS)

    Clauer, C. R.; Kim, H.; Deshpande, K.; Xu, Z.; Weimer, D.; Musko, S.; Crowley, G.; Fish, C.; Nealy, R.; Humphreys, T. E.; Bhatti, J. A.; Ridley, A. J.

    2014-06-01

    We present the development considerations and design for ground based instrumentation that is being deployed on the East Antarctic Plateau along a 40° magnetic meridian chain to investigate interhemispheric magnetically conjugate geomagnetic coupling and other space weather related phenomena. The stations are magnetically conjugate to geomagnetic stations along the west coast of Greenland. The autonomous adaptive low-power instrument platforms being deployed in the Antarctic are designed to operate unattended in remote locations for at least 5 years. They utilize solar power and AGM storage batteries for power, two-way Iridium satellite communication for data acquisition and program/operation modification, support fluxgate and induction magnetometers as well as dual-frequency gps receiver and an HF radio experiment. Size and weight considerations are considered to enable deployment by a small team using small aircraft. Considerable experience has been gained in the development and deployment of remote polar instrumentation that is reflected in the present generation of instrumentation discussed here. We conclude with the lessons learned from our experience in the design, deployment and operation of remote polar instrumentation.

  15. An autonomous adaptive low-power instrument platform (AAL-PIP) for remote high-latitude geospace data collection

    NASA Astrophysics Data System (ADS)

    Clauer, C. R.; Kim, H.; Deshpande, K.; Xu, Z.; Weimer, D.; Musko, S.; Crowley, G.; Fish, C.; Nealy, R.; Humphreys, T. E.; Bhatti, J. A.; Ridley, A. J.

    2014-10-01

    We present the development considerations and design for ground-based instrumentation that is being deployed on the East Antarctic Plateau along a 40° magnetic meridian chain to investigate interhemispheric magnetically conjugate geomagnetic coupling and other space-weather-related phenomena. The stations are magnetically conjugate to geomagnetic stations along the west coast of Greenland. The autonomous adaptive low-power instrument platforms being deployed in the Antarctic are designed to operate unattended in remote locations for at least 5 years. They utilize solar power and AGM storage batteries for power, two-way Iridium satellite communication for data acquisition and program/operation modification, support fluxgate and induction magnetometers as well as a dual-frequency GPS receiver and a high-frequency (HF) radio experiment. Size and weight considerations are considered to enable deployment by a small team using small aircraft. Considerable experience has been gained in the development and deployment of remote polar instrumentation that is reflected in the present generation of instrumentation discussed here. We conclude with the lessons learned from our experience in the design, deployment and operation of remote polar instrumentation.

  16. OCEAN THERMAL ENERGY CONVERSION (OTEC) PROGRAMMATIC ENVIRONMENTAL ANALYSIS

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sands, M. D.

    1980-01-01

    This programmatic environmental analysis is an initial assessment of OTEC technology considering development, demonstration and commercialization; it is concluded that the OTEC development program should continue because the development, demonstration, and commercialization on a single-plant deployment basis should not present significant environmental impacts. However, several areas within the OTEC program require further investigation in order to assess the potential for environmental impacts from OTEC operation, particularly in large-scale deployments and in defining alternatives to closed-cycle biofouling control: (1) Larger-scale deployments of OTEC clusters or parks require further investigations in order to assess optimal platform siting distances necessary to minimize adversemore » environmental impacts. (2) The deployment and operation of the preoperational platform (OTEC-1) and future demonstration platforms must be carefully monitored to refine environmental assessment predictions, and to provide design modifications which may mitigate or reduce environmental impacts for larger-scale operations. These platforms will provide a valuable opportunity to fully evaluate the intake and discharge configurations, biofouling control methods, and both short-term and long-term environmental effects associated with platform operations. (3) Successful development of OTEC technology to use the maximal resource capabilities and to minimize environmental effects will require a concerted environmental management program, encompassing many different disciplines and environmental specialties.« less

  17. Deployment Mechanism for Thermal Pointing System

    NASA Technical Reports Server (NTRS)

    Koski, Kraig

    2014-01-01

    The Deployment Mechanism for the Total and Spectral Solar Irradiance Sensor (TSIS) is responsible for bringing the Thermal Pointing System (TPS) from its stowed, launch locked position to the on-orbit deployed, operational position. The Deployment Mechanism also provides structural support for the TSIS optical bench and two-axis gimbal. An engineering model of the Deployment Mechanism has been environmentally qualified and life tested. This paper will give an overview of the TSIS mission and then describe the development, design, and testing of the Deployment Mechanism.

  18. Marine Seismic System At-Sea-Test Deployment Operation

    DTIC Science & Technology

    1981-10-09

    ton crane can handle deck loads. An early version Deloo type ASK ( Automatic Stationkeeping) system is used to maintain position over a deployed short...b --- 00 - Ir RPT 006-007EV "A 126283 [ I iMIIE SEISMIC SYSTEM I AT-SEA-TEST DEP OYiN OFERATION I GLOBAL MARINE DEVELOPMENT INC 2302 Martin Street...Seismic System At-Sea-Test Deployment Operation 6. PERFORNING *o. REPORT NUMOER IPT 006-007 7. AUTNMORI) O. CONTRACT Ol GRANT NUMOERIa iR. Wallerstedt

  19. Military deployment toxicology: a program manager's perspective.

    PubMed

    Knechtges, P L

    2000-02-01

    The Persian Gulf War drew attention to the potential hazards of chemicals that personnel may encounter during military operations and deployments overseas. During the War, the oil well fires of Kuwait highlighted the military threat of industrial chemicals in the area of operations. Following the War, the occurrence of Gulf War Illnesses brought home concerns and suspicions regarding "low level" and "mixed" exposures to chemicals. The public's concern and attention resulted in numerous institutional responses to the real and perceived problems of health risks during military deployments. These institutional responses ranged in scope from a Presidential Review Directive to the initiative known as the Deployment Toxicology Research, Development, Testing and Evaluation (RDT&E) Program. Most institutions, however, seem to agree that additional research is needed to assess the health risks from chemical exposures during military deployments. Establishing and managing an effective RDT&E program in risk assessment for deployed forces is a challenging enterprise. The Deployment Toxicology RDT&E Program was conceived utilizing the military's acquisition framework, an effective methodology with a proven record of fielding of new technologies. Based on a series of structured meetings with military representatives that would utilize new risk assessment tools, a hierarchical set of plans was developed to identify and prioritize end products. The challenge ahead for the Deployment Toxicology RDT&E Program is to execute these plans, provide the necessary oversight, and transition the results into successful product development.

  20. Special Operations Forces: Opportunities Exist to Improve Transparency of Funding and Assess Potential to Lessen Some Deployments

    DTIC Science & Technology

    2015-07-01

    pace of special operations deployments, but opportunities may exist to better balance the workload across the joint force because activities...executes funding in operation and maintenance; procurement; research , development, test, and evaluation; and military construction accounts.13 SOCOM...regional awareness. Moreover, officials noted that increases in civilian positions were driven partly by DOD’s attempts to rebalance workload and become a

  1. Self-deploying boom

    NASA Technical Reports Server (NTRS)

    Tumulty, W. T.; Sours, W. P.

    1972-01-01

    Development and operation of metal ribbon which acts like self deploying boom are described. Metal ribbon is retained on two rollers for storage and extends into nonretractable tubular structure upon release. Illustration of equipment is provided.

  2. The Impact of Military Deployment and Reintegration on Children and Parenting: A Systematic Review

    PubMed Central

    Creech, Suzannah K.; Hadley, Wendy; Borsari, Brian

    2015-01-01

    Hundreds of thousands of children have had at least 1 parent deploy as part of military operations in Iraq (Operation Iraqi Freedom; OIF; Operation New Dawn; OND) and Afghanistan (Operation Enduring Freedom; OEF). However, there is little knowledge of the impact of deployment on the relationship of parents and their children. This systematic review examines findings from 3 areas of relevant research: the impact of deployment separation on parenting, and children's emotional, behavioral, and health outcomes; the impact of parental mental health symptoms during and after reintegration; and current treatment approaches in veteran and military families. Several trends emerged. First, across all age groups, deployment of a parent may be related to increased emotional and behavioral difficulties for children, including higher rates of health-care visits for psychological problems during deployment. Second, symptoms of PTSD and depression may be related to increased symptomatology in children and problems with parenting during and well after reintegration. Third, although several treatments have been developed to address the needs of military families, most are untested or in the early stages of implementation and evaluation. This body of research suggests several promising avenues for future research. PMID:25844014

  3. Experience with ActiveX control for simple channel access

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Timossi, C.; Nishimura, H.; McDonald, J.

    2003-05-15

    Accelerator control system applications at Berkeley Lab's Advanced Light Source (ALS) are typically deployed on operator consoles running Microsoft Windows 2000 and utilize EPICS[2]channel access for data access. In an effort to accommodate the wide variety of Windows based development tools and developers with little experience in network programming, ActiveX controls have been deployed on the operator stations. Use of ActiveX controls for use in the accelerator control environment has been presented previously[1]. Here we report on some of our experiences with the use and development of these controls.

  4. Development of deployable structures for large space platform systems, part 1

    NASA Technical Reports Server (NTRS)

    Cox, R. L.; Nelson, R. A.

    1982-01-01

    Eight deployable platform design objectives were established: autodeploy/retract; fully integrated utilities; configuration variability; versatile payload and subsystem interfaces; structural and packing efficiency; 1986 technology readiness; minimum EVA/RMS; and Shuttle operational compatibility.

  5. Autonomous Sensors for Large Scale Data Collection

    NASA Astrophysics Data System (ADS)

    Noto, J.; Kerr, R.; Riccobono, J.; Kapali, S.; Migliozzi, M. A.; Goenka, C.

    2017-12-01

    Presented here is a novel implementation of a "Doppler imager" which remotely measures winds and temperatures of the neutral background atmosphere at ionospheric altitudes of 87-300Km and possibly above. Incorporating both recent optical manufacturing developments, modern network awareness and the application of machine learning techniques for intelligent self-monitoring and data classification. This system achieves cost savings in manufacturing, deployment and lifetime operating costs. Deployed in both ground and space-based modalities, this cost-disruptive technology will allow computer models of, ionospheric variability and other space weather models to operate with higher precision. Other sensors can be folded into the data collection and analysis architecture easily creating autonomous virtual observatories. A prototype version of this sensor has recently been deployed in Trivandrum India for the Indian Government. This Doppler imager is capable of operation, even within the restricted CubeSat environment. The CubeSat bus offers a very challenging environment, even for small instruments. The lack of SWaP and the challenging thermal environment demand development of a new generation of instruments; the Doppler imager presented is well suited to this environment. Concurrent with this CubeSat development is the development and construction of ground based arrays of inexpensive sensors using the proposed technology. This instrument could be flown inexpensively on one or more CubeSats to provide valuable data to space weather forecasters and ionospheric scientists. Arrays of magnetometers have been deployed for the last 20 years [Alabi, 2005]. Other examples of ground based arrays include an array of white-light all sky imagers (THEMIS) deployed across Canada [Donovan et al., 2006], oceans sensors on buoys [McPhaden et al., 2010], and arrays of seismic sensors [Schweitzer et al., 2002]. A comparable array of Doppler imagers can be constructed and deployed on the ground, to compliment the CubeSat data.

  6. US program in anchored data buoy and the other fixed observation platforms

    NASA Astrophysics Data System (ADS)

    McCall, J. C.

    The NOAA Data Buoy Office (NOBO) develops and operates moored buoys in all U.S. coastal and offshore waters from New England to Hawaii (including the Great Lakes) to provide real-time environmental measurements in data-sparse areas for the National Weather Service and other public and private users. The NOBO also has a program for development, deployment, and operation of drifting buoys, which provide environmental measurements in the South Atlantic and Pacific from Chili to Australia and in the Northern Hemisphere. In addition, NOBO develops, deploys, and operates special purpose environmental measuring systems for other government agencies, particularly for petroleum-related purposes, and has an engineering development effort in procuring new and improved sensor and communications systems.

  7. Intelligent Transportation Systems/Commercial Vehicle Operations Project Plan For Commercial Vehicle Information Systems And Networks Electronic Data Interchange Standards Development And Deployment

    DOT National Transportation Integrated Search

    1996-12-02

    THE PURPOSE OF THIS DOCUMENT IS TO PROVIDE INFORMATION ON THE PLANNING FOR THE DEVELOPMENT AND DEPLOYMENT OF EDI STANDARDS FOR COMMERCIAL VEHICLE INFORMATION SYSTEMS AND NETWORKS (CVISN). THE STATUS, PRIORITIES, AND SCHEDULES FOR THIS EFFORT ARE CONT...

  8. Component-Based Visualization System

    NASA Technical Reports Server (NTRS)

    Delgado, Francisco

    2005-01-01

    A software system has been developed that gives engineers and operations personnel with no "formal" programming expertise, but who are familiar with the Microsoft Windows operating system, the ability to create visualization displays to monitor the health and performance of aircraft/spacecraft. This software system is currently supporting the X38 V201 spacecraft component/system testing and is intended to give users the ability to create, test, deploy, and certify their subsystem displays in a fraction of the time that it would take to do so using previous software and programming methods. Within the visualization system there are three major components: the developer, the deployer, and the widget set. The developer is a blank canvas with widget menu items that give users the ability to easily create displays. The deployer is an application that allows for the deployment of the displays created using the developer application. The deployer has additional functionality that the developer does not have, such as printing of displays, screen captures to files, windowing of displays, and also serves as the interface into the documentation archive and help system. The third major component is the widget set. The widgets are the visual representation of the items that will make up the display (i.e., meters, dials, buttons, numerical indicators, string indicators, and the like). This software was developed using Visual C++ and uses COTS (commercial off-the-shelf) software where possible.

  9. Phasor Simulator for Operator Training Project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Dyer, Jim

    2016-09-14

    Synchrophasor systems are being deployed in power systems throughout the North American Power Grid and there are plans to integrate this technology and its associated tools into Independent System Operator (ISO)/utility control room operations. A pre-requisite to using synchrophasor technologies in control rooms is for operators to obtain training and understand how to use this technology in real-time situations. The Phasor Simulator for Operator Training (PSOT) project objective was to develop, deploy and demonstrate a pre-commercial training simulator for operators on the use of this technology and to promote acceptance of the technology in utility and ISO/Regional Transmission Owner (RTO)more » control centers.« less

  10. Advantages and limitations of remotely operated sea floor drill rigs

    NASA Astrophysics Data System (ADS)

    Freudenthal, T.; Smith, D. J.; Wefer, G.

    2009-04-01

    A variety of research targets in marine sciences including the investigation of gas hydrates, slope stability, alteration of oceanic crust, ore formation and palaeoclimate can be addressed by shallow drilling. However, drill ships are mostly used for deep drillings, both because the effort of building up a drill string from a drill ship to the deep sea floor is tremendous and control on drill bit pressure from a movable platform and a vibrating drill string is poor especially in the upper hundred meters. During the last decade a variety of remotely operated drill rigs have been developed, that are deployed on the sea bed and operated from standard research vessels. These developments include the BMS (Bentic Multicoring System, developed by Williamson and Associates, operated by the Japanese Mining Agency), the PROD (Portable Remotely Operated Drill, developed and operated by Benthic Geotech), the Rockdrill 2 (developed and operated by the British geological Survey) and the MeBo (German abbreviation for sea floor drill rig, developed and operated by Marum, University of Bremen). These drill rigs reach drilling depths between 15 and 100 m. For shallow drillings remotely operated drill rigs are a cost effective alternative to the services of drill ships and have the major advantage that the drilling operations are performed from a stable platform independent of any ship movements due to waves, wind or currents. Sea floor drill rigs can be deployed both in shallow waters and the deep sea. A careful site survey is required before deploying the sea floor drill rig. Slope gradient, small scale topography and soil strength are important factors when planning the deployment. The choice of drill bits and core catcher depend on the expected geology. The required drill tools are stored on one or two magazines on the drill rig. The MeBo is the only remotely operated drill rig world wide that can use wire line coring technique. This method is much faster than conventional drilling. It has the advantage that the drill string stays in the drilled hole during the entire drilling process and prevents the drilled hole from collapsing while the inner core barrels comprising the drilled core sections are hooked up inside the drill string using a wire.

  11. Sharing the Burden and Risk: An Operational Assessment of the Reserve Components in Operation Iraqi Freedom

    DTIC Science & Technology

    2016-10-01

    Manpower Data Center (DMDC) for data extracts identifying monthly deployments from September 2001 through December 2014. This data would answer questions... Manpower Data Center (DMDC) databases captured which service members were mobilized and deployed. Government history offices, lessons learned...develop MOEs and MOPs to conduct assessments. 1. Data Extracts Concurrent with engagement efforts, IDA queried the Defense Manpower Data Center (DMDC

  12. Longitudinal assessment of gender differences in the development of PTSD among US military personnel deployed in support of the operations in Iraq and Afghanistan.

    PubMed

    Jacobson, Isabel G; Donoho, Carrie J; Crum-Cianflone, Nancy F; Maguen, Shira

    2015-09-01

    Divergent findings from previous research examining gender differences in the development of posttraumatic stress disorder (PTSD) among US military members deployed to the operations in Iraq or Afghanistan (recent operations) prompted this study utilizing a matching approach to examine whether risk for new-onset PTSD and PTSD severity scores differed by gender. US military members from the Millennium Cohort Study deployed in support of the recent operations were followed for approximately 7 years from baseline through 2 follow-up periods between 2001 and 2008. Propensity score matching was used to match 1 male to each female using demographic, military, and behavioral factors including baseline sexual assault. Analyses were stratified by combat experience defined as reporting at least one of five exposures during follow-up. Outcome measures included a positive screen for PTSD and severity scores measured by the PTSD Patient Checklist-Civilian Version. Discrete-time survival analysis quantified the association between gender and incident PTSD. Among 4684 matched subjects (2342 women and men), 6.7% of women and 6.1% of men developed PTSD during follow-up. Results showed no significant gender differences for the likelihood of developing PTSD or for PTSD severity scores among women and men who reported combat experience and among those who did not. This study is the first of its kind to match a large population of male and female service members on important baseline characteristics including sexual assault. Findings suggest that while combat deployed personnel develop PTSD, women do not have a significantly different risk for developing PTSD than men after experiencing combat. Published by Elsevier Ltd.

  13. Connected vehicle pilot deployment program phase 1, security management operational concept : ICF/Wyoming.

    DOT National Transportation Integrated Search

    2016-03-14

    The Wyoming Department of Transportations (WYDOT) Connected Vehicle (CV) Pilot Deployment Program is intended to develop a suite of applications that utilize vehicle to infrastructure (V2I) and vehicle to vehicle (V2V) communication technology to ...

  14. The impact of antecedent trauma exposure and mental health symptoms on the post-deployment mental health of Afghanistan-deployed Australian troops.

    PubMed

    Searle, Amelia K; Van Hooff, Miranda; Lawrence-Wood, Ellie R; Grace, Blair S; Saccone, Elizabeth J; Davy, Carol P; Lorimer, Michelle; McFarlane, Alexander C

    2017-10-01

    Both traumatic deployment experiences and antecedent traumas increase personnel's risk of developing PTSD and depression. However, only cross-sectional studies have assessed whether antecedent trauma moderates stress reactions to deployment experiences. This study prospectively examines whether antecedent trauma moderates the association between deployment trauma and post-deployment PTSD and depressive symptoms after accounting for antecedent mental health problems, in a large Australian Defence Force (ADF) sample. In the ADF Middle East Area of Operations Prospective Study, currently-serving military personnel deployed to Afghanistan across 2010-2012 (n = 1122) completed self-reported measures at pre-deployment and post-deployment. Within multivariable regressions, associations between deployment trauma and PTSD and depressive symptoms at post-deployment were stronger for personnel with greater antecedent trauma. However, once adjusting for antecedent mental health problems, these significant interaction effects disappeared. Instead, deployment-related trauma and antecedent mental health problems showed direct associations with post-deployment mental health problems. Antecedent trauma was also indirectly associated with post-deployment mental health problems through antecedent mental health problems. Similar associations were seen with prior combat exposure as a moderator. Antecedent and deployment trauma were reported retrospectively. Self-reports may also suffer from social desirability bias, especially at pre-deployment. Our main effects results support the pervasive and cumulative negative effect of trauma on military personnel, regardless of its source. While antecedent trauma does not amplify personnel's psychological response to deployment trauma, it is indirectly associated with increased post-deployment mental health problems. Antecedent mental health should be considered within pre-deployment prevention programs, and deployment-trauma within post-operational screening. Copyright © 2017. Published by Elsevier B.V.

  15. Development of a portable passive-acoustic bedload monitoring system

    USDA-ARS?s Scientific Manuscript database

    A hydrophone-based passive acoustic bedload-monitoring system was designed, tested and deployed by researchers at the University of Mississippi and the National Sedimentation Laboratory in Oxford, MS. The hydrophone system was designed to be easily deployed and operated by non-experts. In addition, ...

  16. Connected vehicle pilot deployment program phase 1, concept of operations (ConOps), ICF/Wyoming.

    DOT National Transportation Integrated Search

    2015-12-01

    The Wyoming Department of Transportations (WYDOT) Connected Vehicle (CV) Pilot Deployment Program is intended to develop a suite of applications that utilize vehicle to infrastructure (V2I) and vehicle to vehicle (V2V) communication technology to ...

  17. Development Of Human Factors Guidelines For Advanced Traveler Information Systens And Commercial Vehicle Operations: Comparable Systems Analysis

    DOT National Transportation Integrated Search

    1998-11-01

    This document describes the strategy used to evaluate the Intelligent Transportation Systems (ITS) Joint Program Offices Metropolitan Model Deployment Initiative (MMDI). The MMDI is an aggressive deployment of ITS at four urban sites: New York/New...

  18. The Field Shower Wastewater Recycling System: Development of a Program of Instruction and Preliminary Analysis of Its Potential Health Implications.

    DTIC Science & Technology

    1987-02-01

    The FSWRS will be used by forces deployed to Theaters of Operations located in water-short areas of the world, and will greatly reduce water supply... operators take ’ A appropriate precautions in handling sulfuric acid and un- . treat.d waters. Although no health hazards are anticipated to result from...field. The FSWRS will be used by forces deployed to Theaters of Operations located in water short areas of the world, and will greatly reduce water

  19. Deployable antenna phase A study

    NASA Technical Reports Server (NTRS)

    Schultz, J.; Bernstein, J.; Fischer, G.; Jacobson, G.; Kadar, I.; Marshall, R.; Pflugel, G.; Valentine, J.

    1979-01-01

    Applications for large deployable antennas were re-examined, flight demonstration objectives were defined, the flight article (antenna) was preliminarily designed, and the flight program and ground development program, including the support equipment, were defined for a proposed space transportation system flight experiment to demonstrate a large (50 to 200 meter) deployable antenna system. Tasks described include: (1) performance requirements analysis; (2) system design and definition; (3) orbital operations analysis; and (4) programmatic analysis.

  20. Connected vehicle pilot deployment program phase I : security management operational concept, Tampa Hillsborough Expressway Authority (THEA).

    DOT National Transportation Integrated Search

    2016-05-01

    The Tampa Hillsborough Expressway Authority (THEA) Connected Vehicle (CV) Pilot Deployment Program is intended to develop a suite of applications that utilize vehicle to infrastructure (V2I) and vehicle to vehicle (V2V) communication technology to re...

  1. ViNEL: A Virtual Networking Lab for Cyber Defense Education

    ERIC Educational Resources Information Center

    Reinicke, Bryan; Baker, Elizabeth; Toothman, Callie

    2018-01-01

    Professors teaching cyber security classes often face challenges when developing workshops for their students: How does one quickly and efficiently configure and deploy an operating system for a temporary learning/testing environment? Faculty teaching these classes spend countless hours installing, configuring and deploying multiple system…

  2. More Than 1,000 Fuel Cell Units Deployed Through DOE ARRA Funding (Fact Sheet)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    This NREL Hydrogen and Fuel Cell Technical Highlight describes how early market end users are operating 1,111 fuel cell units at 301 sites in 20 states with funding from the U.S. Department of Energy Fuel Cell Technologies Program and analysis by NREL. The American Recovery and Reinvestment Act (ARRA) funded the deployment of approximately 1,000 fuel cell systems in key early markets to accelerate the commercialization and deployment of fuel cells and fuel cell manufacturing, installation, maintenance, and support services. In support of the ARRA fuel cell deployment objectives, NREL analyzes and validates the technology in real-world applications, reports onmore » the technology status, and facilitates the development of fuel cell technologies, manufacturing, and operations in strategic markets-including material handling equipment, backup power, and stationary power-where fuel cells can compete with conventional technologies. NREL is validating hydrogen and fuel cell systems in real-world settings through data collection, analysis, and reporting. The fuel cell and infrastructure analysis provides an independent, third-party assessment that focuses on fuel cell system and hydrogen infrastructure performance, operation, maintenance, use, and safety. An objective of the ARRA fuel cell project-to deploy approximately 1,000 fuel cell systems in key early markets - has been met in two years. By the end of 2011, 504 material handling equipment (MHE) fuel cell units were operating at 8 facilities and 607 backup power fuel cell units were operating at 293 sites. MHE and backup power are two markets where fuel cells are capable of meeting the operating demands, and deployments can be leveraged to accelerate fuel cell commercialization.« less

  3. Engineering challenges of operating year-round portable seismic stations at high-latitude

    NASA Astrophysics Data System (ADS)

    Beaudoin, Bruce; Carpenter, Paul; Hebert, Jason; Childs, Dean; Anderson, Kent

    2017-04-01

    Remote portable seismic stations are, in most cases, constrained by logistics and cost. High latitude operations introduce environmental, technical and logistical challenges that require substantially more engineering work to ensure robust, high quality data return. Since 2006, IRIS PASSCAL has been funded by NSF to develop, deploy, and maintain a pool of polar specific seismic stations. Here, we describe our latest advancements to mitigate the challenges of high-latitude, year-round station operation. The IRIS PASSCAL program has supported high-latitude deployments since the late 1980s. These early deployments were largely controlled source, summer only experiments. In early 2000 PASSCAL users began proposing year-round deployments of broadband stations in some of the harshest environments on the planet. These early year-round deployments were stand-alone (no telemetry) stations largely designed to operate during summer months and then run as long as possible during the winter with hopes the stations would revive come following summer. In 2006 and in collaboration with UNAVCO, we began developing communications, power systems, and enclosures to extend recording to year-round. Since this initial effort, PASSCAL continued refinement to power systems, enclosure design and manufacturability, and real-time data communications. Several sensor and data logger manufacturers have made advances in cold weather performance and delivered newly designed instruments that have furthered our ability to successfully run portable stations at high-latitude with minimal logistics - reducing size and weight of instruments and infrastructure. All PASSCAL polar engineering work is openly shared through our website: www.passcal.nmt.edu/content/polar

  4. Development and Deployment of Systems-Based Approaches for the Management of Soilborne Plant Pathogens.

    PubMed

    Chellemi, D O; Gamliel, A; Katan, J; Subbarao, K V

    2016-03-01

    Biological suppression of soilborne diseases with minimal use of outside interventive actions has been difficult to achieve in high input conventional crop production systems due to the inherent risk of pest resurgence. This review examines previous approaches to the management of soilborne disease as precursors to the evolution of a systems-based approach, in which plant disease suppression through natural biological feedback mechanisms in soil is incorporated into the design and operation of cropping systems. Two case studies are provided as examples in which a systems-based approach is being developed and deployed in the production of high value crops: lettuce/strawberry production in the coastal valleys of central California (United States) and sweet basil and other herb crop production in Israel. Considerations for developing and deploying system-based approaches are discussed and operational frameworks and metrics to guide their development are presented with the goal of offering a credible alternative to conventional approaches to soilborne disease management.

  5. The Development and Deployment of a Maintenance Operations Safety Survey.

    PubMed

    Langer, Marie; Braithwaite, Graham R

    2016-11-01

    Based on the line operations safety audit (LOSA), two studies were conducted to develop and deploy an equivalent tool for aircraft maintenance: the maintenance operations safety survey (MOSS). Safety in aircraft maintenance is currently measured reactively, based on the number of audit findings, reportable events, incidents, or accidents. Proactive safety tools designed for monitoring routine operations, such as flight data monitoring and LOSA, have been developed predominantly for flight operations. In Study 1, development of MOSS, 12 test peer-to-peer observations were collected to investigate the practicalities of this approach. In Study 2, deployment of MOSS, seven expert observers collected 56 peer-to-peer observations of line maintenance checks at four stations. Narrative data were coded and analyzed according to the threat and error management (TEM) framework. In Study 1, a line check was identified as a suitable unit of observation. Communication and third-party data management were the key factors in gaining maintainer trust. Study 2 identified that on average, maintainers experienced 7.8 threats (operational complexities) and committed 2.5 errors per observation. The majority of threats and errors were inconsequential. Links between specific threats and errors leading to 36 undesired states were established. This research demonstrates that observations of routine maintenance operations are feasible. TEM-based results highlight successful management strategies that maintainers employ on a day-to-day basis. MOSS is a novel approach for safety data collection and analysis. It helps practitioners understand the nature of maintenance errors, promote an informed culture, and support safety management systems in the maintenance domain. © 2016, Human Factors and Ergonomics Society.

  6. The Development and Deployment of a Maintenance Operations Safety Survey

    PubMed Central

    Langer, Marie; Braithwaite, Graham R.

    2016-01-01

    Objective: Based on the line operations safety audit (LOSA), two studies were conducted to develop and deploy an equivalent tool for aircraft maintenance: the maintenance operations safety survey (MOSS). Background: Safety in aircraft maintenance is currently measured reactively, based on the number of audit findings, reportable events, incidents, or accidents. Proactive safety tools designed for monitoring routine operations, such as flight data monitoring and LOSA, have been developed predominantly for flight operations. Method: In Study 1, development of MOSS, 12 test peer-to-peer observations were collected to investigate the practicalities of this approach. In Study 2, deployment of MOSS, seven expert observers collected 56 peer-to-peer observations of line maintenance checks at four stations. Narrative data were coded and analyzed according to the threat and error management (TEM) framework. Results: In Study 1, a line check was identified as a suitable unit of observation. Communication and third-party data management were the key factors in gaining maintainer trust. Study 2 identified that on average, maintainers experienced 7.8 threats (operational complexities) and committed 2.5 errors per observation. The majority of threats and errors were inconsequential. Links between specific threats and errors leading to 36 undesired states were established. Conclusion: This research demonstrates that observations of routine maintenance operations are feasible. TEM-based results highlight successful management strategies that maintainers employ on a day-to-day basis. Application: MOSS is a novel approach for safety data collection and analysis. It helps practitioners understand the nature of maintenance errors, promote an informed culture, and support safety management systems in the maintenance domain. PMID:27411354

  7. Return to contingency: developing a coherent strategy for future R2E/R3 land medical capabilities.

    PubMed

    Ingram, Mike; Mahan, J

    2015-03-01

    Key to deploying forces in the future will be the provision of a rapidly deployable Deployed Hospital Capability. Developing this capability has been the focus of 34 Field Hospital and 2nd Medical Brigade over the last 18 months and this paper describes a personal account of this development work to date. Future contingent Deployed Hospital Capability must meet the requirements of Defence; that is to be rapidly deployable delivering a hospital standard of care. The excellence seen in clinical delivery on recent operations is intensive; in personnel, equipment, infrastructure and sustainment. The challenge in developing a coherent capability has been in balancing the clinical capability and capacity against strategic load in light of recent advances in battlefield medicine. This paper explores the issues encountered and solutions found to date in reconstituting a Very High Readiness Deployed Hospital Capability. Published by the BMJ Publishing Group Limited. For permission to use (where not already granted under a licence) please go to http://group.bmj.com/group/rights-licensing/permissions.

  8. An operational computer program to control Self Defense Surface Missile System operations

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Roe, C.L.

    1991-12-01

    An account is given of the system architecture and operational protocols of the NATO Seasparrow Surface Missile System (NSSMS) Operational Computer Program (OCP) which has been developed, and is being deployed multinationally, to respond against antiship missiles. Flowcharts are presented for the target detection and tracking, control, and engagement phases of the Self Defense Surface Missile System that is controlled by the OCP. USN and other NATO vessels will carry the NSSMS well into the next century; the OCP presently described will be deployed in the course of 1992 to enhance the self-defense capabilities of the NSSMS-equipped fleet. 8 refs.

  9. Solidifying Small Satellite Access to Orbit via the International Space Station (ISS): Cyclops' Deployment of the Lonestar SmallSat from the ISS

    NASA Technical Reports Server (NTRS)

    Hershey, Matthew P.; Newswander, Daniel R.; Evernden, Brent A.

    2016-01-01

    On January 29, 2016, the Space Station Integrated Kinetic Launcher for Orbital Payload Systems (SSIKLOPS), known as "Cyclops" to the International Space Station (ISS) community, deployed Lonestar from the ISS. The deployment of Lonestar, a collaboration between Texas A&M University and the University of Texas at Austin, continued to showcase the simplicity and reliability of the Cyclops deployment system. Cyclops, a NASA-developed, dedicated 10-100 kg class ISS SmallSat deployment system, utilizes the Japanese airlock and robotic systems to seamlessly insert SmallSats into orbit. This paper will illustrate Cyclops' successful deployment of Lonestar from the ISS as well as outline its concept of operations, interfaces, requirements, and processes.

  10. Sao Paulo Lightning Mapping Array (SP-LMA): Deployment, Operation and Initial Data Analysis

    NASA Technical Reports Server (NTRS)

    Blakeslee, R.; Bailey, J. C.; Carey, L. D.; Rudlosky, S.; Goodman, S. J.; Albrecht, R.; Morales, C. A.; Anseimo, E. M.; Pinto, O.

    2012-01-01

    An 8-10 station Lightning Mapping Array (LMA) network is being deployed in the vicinity of Sao Paulo to create the SP-LMA for total lightning measurements in association with the international CHUVA [Cloud processes of the main precipitation systems in Brazil: A contribution to cloud resolving modeling and to the GPM (Global Precipitation Measurement)] field campaign. Besides supporting CHUVA science/mission objectives and the Sao Luiz do Paraitinga intensive operation period (IOP) in November-December 2011, the SP-LMA will support the generation of unique proxy data for the Geostationary Lightning Mapper (GLM) and Advanced Baseline Imager (ABI), both sensors on the NOAA Geostationary Operational Environmental Satellite-R (GOES-R), presently under development and scheduled for a 2015 launch. The proxy data will be used to develop and validate operational algorithms so that they will be ready for use on "day1" following the launch of GOES-R. A preliminary survey of potential sites in the vicinity of Sao Paulo was conducted in December 2009 and January 2010, followed up by a detailed survey in July 2010, with initial network deployment scheduled for October 2010. However, due to a delay in the Sao Luiz do Paraitinga IOP, the SP-LMA will now be installed in July 2011 and operated for one year. Spacing between stations is on the order of 15-30 km, with the network "diameter" being on the order of 30-40 km, which provides good 3-D lightning mapping 150 km from the network center. Optionally, 1-3 additional stations may be deployed in the vicinity of Sao Jos dos Campos.

  11. Study of selected tether applications in space, phase 3, volume 2

    NASA Technical Reports Server (NTRS)

    1986-01-01

    The results of a Phase 3 study of two Selected Tether Applications in Space (STAIS); deorbit of a Shuttle and launch of an Orbital Transfer Vehicle (OTV), both from the space station using a tether were examined. The study objectives were to: perform a preliminary engineering design, define operational scenarios, develop a common cost model, perform cost benefits analyses, and develop a Work Breakdown Structure (WBS). Key features of the performance analysis were to identify the net increases in effective Shuttle cargo capability if tethers are used to assist in the deorbit of Shuttles and the launching of the OTVs from the space station and to define deployer system designs required to accomplish these tasks. Deployer concepts were designed and discussed. Operational scenarios, including timelines, for both tethered and nontethered Shuttle and OTV operations at the space station were evaluated. A summary discussion of the Selected Tether Applications Cost Model (STACOM) and the results of the cost benefits analysis are presented. Several critical technologies needed to implement tether assisted deployment of payloads are also discussed. Conclusions and recommendations are presented.

  12. Development, deployment, and assessment of activity-based transportation courses.

    DOT National Transportation Integrated Search

    2012-12-01

    This project developed four new activitybased transportation courses including Traffic Signal Systems Operations and Design, Understanding and Communicating Transportation Data, Introduction to Freight Transportation, and Rura...

  13. Deployment of a Prototype Plant GFP Imager at the Arthur Clarke Mars Greenhouse of the Haughton Mars Project.

    PubMed

    Paul, Anna-Lisa; Bamsey, Matthew; Berinstain, Alain; Braham, Stephen; Neron, Philip; Murdoch, Trevor; Graham, Thomas; Ferl, Robert J

    2008-04-18

    The use of engineered plants as biosensors has made elegant strides in the past decades, providing keen insights into the health of plants in general and particularly in the nature and cellular location of stress responses. However, most of the analytical procedures involve laboratory examination of the biosensor plants. With the advent of the green fluorescence protein (GFP) as a biosensor molecule, it became at least theoretically possible for analyses of gene expression to occur telemetrically, with the gene expression information of the plant delivered to the investigator over large distances simply as properly processed fluorescence images. Spaceflight and other extraterrestrial environments provide unique challenges to plant life, challenges that often require changes at the gene expression level to accommodate adaptation and survival. Having previously deployed transgenic plant biosensors to evaluate responses to orbital spaceflight, we wished to develop the plants and especially the imaging devices required to conduct such experiments robotically, without operator intervention, within extraterrestrial environments. This requires the development of an autonomous and remotely operated plant GFP imaging system and concomitant development of the communications infrastructure to manage dataflow from the imaging device. Here we report the results of deploying a prototype GFP imaging system within the Arthur Clarke Mars Greenhouse (ACMG) an autonomously operated greenhouse located within the Haughton Mars Project in the Canadian High Arctic. Results both demonstrate the applicability of the fundamental GFP biosensor technology and highlight the difficulties in collecting and managing telemetric data from challenging deployment environments.

  14. Deployment-related Respiratory Issues.

    PubMed

    Morris, Michael J; Rawlins, Frederic A; Forbes, Damon A; Skabelund, Andrew J; Lucero, Pedro F

    2016-01-01

    Military deployment to Southwest Asia since 2003 in support of Operations Enduring Freedom/Iraqi Freedom/New Dawn has presented unique challenges from a pulmonary perspective. Various airborne hazards in the deployed environment include suspended geologic dusts, burn pit smoke, vehicle exhaust emissions, industrial air pollution, and isolated exposure incidents. These exposures may give rise to both acute respiratory symptoms and in some instances development of chronic lung disease. While increased respiratory symptoms during deployment are well documented, there is limited data on whether inhalation of airborne particulate matter is causally related to an increase in either common or unique pulmonary diseases. While disease processes such as acute eosinophilic pneumonia and exacerbation of preexisting asthma have been adequately documented, there is significant controversy surrounding the potential effects of deployment exposures and development of rare pulmonary disorders such as constrictive bronchiolitis. The role of smoking and related disorders has yet to be defined. This article presents the current evidence for deployment-related respiratory symptoms and ongoing Department of Defense studies. Further, it also provides general recommendations for evaluating pulmonary health in the deployed military population.

  15. Design Validation Methodology Development for an Aircraft Sensor Deployment System

    NASA Astrophysics Data System (ADS)

    Wowczuk, Zenovy S.

    The OCULUS 1.0 Sensor Deployment concept design, was developed in 2004 at West Virginia University (WVU), outlined the general concept of a deployment system to be used on a C-130 aircraft. As a sequel, a new system, OCULUS 1.1, has been developed and designed. The new system transfers the concept system design to a safety of flight design, and also enhanced to a pre-production system to be used as the test bed to gain full military certification approval. The OCULUS 1.1 system has an implemented standard deployment system/procedure to go along with a design suited for military certification and implementation. This design process included analysis of the system's critical components and the generation of a critical component holistic model to be used as an analysis tool for future payload modification made to the system. Following the completion of the OCULUS 1.1 design, preparations and procedures for obtaining military airworthiness certification are described. The airworthiness process includes working with the agency overseeing all modifications to the normal operating procedures made to military C-130 aircraft and preparing the system for an experimental flight test. The critical steps in his process include developing a complete documentation package that details the analysis performed on the OCULUS 1.1 system and also the design of experiment flight test plan to analyze the system. Following the approval of the documentation and design of experiment an experimental flight test of the OCULUS 1.1 system was performed to verify the safety and airworthiness of the system. This test proved successfully that the OCULUS 1.1 system design was airworthy and approved for military use. The OCULUS 1.1 deployment system offers an open architecture design that is ideal for use as a sensor testing platform for developmental airborne sensors. The system's patented deployment methodology presents a simplistic approach to reaching the systems final operating position which offers the most robust field of view area of rear ramp deployment systems.

  16. Development, deployment and operations of ATLAS databases

    NASA Astrophysics Data System (ADS)

    Vaniachine, A. V.; Schmitt, J. G. v. d.

    2008-07-01

    In preparation for ATLAS data taking, a coordinated shift from development towards operations has occurred in ATLAS database activities. In addition to development and commissioning activities in databases, ATLAS is active in the development and deployment (in collaboration with the WLCG 3D project) of the tools that allow the worldwide distribution and installation of databases and related datasets, as well as the actual operation of this system on ATLAS multi-grid infrastructure. We describe development and commissioning of major ATLAS database applications for online and offline. We present the first scalability test results and ramp-up schedule over the initial LHC years of operations towards the nominal year of ATLAS running, when the database storage volumes are expected to reach 6.1 TB for the Tag DB and 1.0 TB for the Conditions DB. ATLAS database applications require robust operational infrastructure for data replication between online and offline at Tier-0, and for the distribution of the offline data to Tier-1 and Tier-2 computing centers. We describe ATLAS experience with Oracle Streams and other technologies for coordinated replication of databases in the framework of the WLCG 3D services.

  17. Political and legal implications of developing and operating a satellite power system

    NASA Technical Reports Server (NTRS)

    Hazelrigg, G. A., Jr.

    1977-01-01

    A number of political and legal implications of developing and operating a satellite power system (SPS) are identified and studied in this report. These include the vulnerability of SPS to actions of adversaries, communications impacts, the legality of an SPS in orbit including on-orbit military protection, alleviation of political concerns about deployment and operation of SPS, programmatic planning for SPS and the interaction of SPS with federal regulatory agencies and major departments. In comparing SPS to terrestrial power stations, it is seen that the political problems are neither clearly larger nor clearly smaller--they are clearly different and they are international in nature. If SPS is to become a reality these problems must be dealt with. Five major issues are identified. These must be resolved in order to obtain international acceptance of SPS. However, this study has found no insurmountable obstacles that would clearly prohibit the deployment, operation and protection of an SPS fleet.

  18. New Antenna Deployment, Pointing and Supporting Mechanism

    NASA Technical Reports Server (NTRS)

    Costabile, V.; Lumaca, F.; Marsili, P.; Noni, G.; Portelli, C.

    1996-01-01

    On ITALSAT Flight 2, the Italian telecommunications satellite, the two L-Ka antennas (Tx and Rx) use two large deployable reflectors (2000-mm diameter), whose deployment and fine pointing functions are accomplished by means of an innovative mechanism concept. The Antenna Deployment & Pointing Mechanism and Supporting Structure (ADPMSS) is based on a new configuration solution, where the reflector and mechanisms are conceived as an integrated, self-contained assembly. This approach is different from the traditional configuration solution. Typically, a rigid arm is used to deploy and then support the reflector in the operating position, and an Antenna Pointing Mechanism (APM) is normally interposed between the reflector and the arm for steering operation. The main characteristics of the ADPMSS are: combined implementation of deployment, pointing, and reflector support; optimum integration of active components and interface matching with the satellite platform; structural link distribution to avoid hyperstatic connections; very light weight and; high performance in terms of deployment torque margin and pointing range/accuracy. After having successfully been subjected to all component-level qualification and system-level acceptance tests, two flight ADPMSS mechanisms (one for each antenna) are now integrated on ITALSAT F2 and are ready for launch. This paper deals with the design concept, development, and testing program performed to qualify the ADPMSS mechanism.

  19. Long-term military work outcomes in soldiers who become mental health casualties when deployed on operations.

    PubMed

    Jones, Norman; Fear, Nicola T; Jones, Margaret; Wessely, Simon; Greenberg, Neil

    2010-01-01

    little is known about longer term military work outcomes in UK military personnel who develop mental health problems when operationally deployed. Deployed Field Mental Health Teams (FMHTs) who support them follow the principles of "Forward Psychiatry," aiming to treat psychiatric casualties close to the front line to maximize operational effectiveness and occupational retention. to examine the short- and long-term military work outcomes in soldiers deployed to Iraq between 2003 and 2007 who were referred to the FMHT. FMHT clinical records were linked to occupational records with 825 resulting matches. 71.6% of the referred soldiers with a documented short-term military work outcome returned to their operational unit, and 73.5% of those who had a documented long-term military work outcome served on for a period in excess of two years. Adjusting for potential confounders, a shorter service length and removal from the operational theatre were both strongly associated with premature discharge; however, it was not possible to determine the severity of the presenting mental health problem and assess whether this impacted outcome. the results of this study support the use of the Forward Psychiatry principles in achieving good short-term military work outcomes. Utilizing these principles, three-quarters of those referred to the FMHT were returned to their deployed unit and approximately three-quarters of those assessed by the FMHT remained in service two years after referral. We suggest that these are positive work outcomes; however, being evacuated out of the operational environment and having a short service length were both associated with premature discharge, though we were unable to examine the role of illness severity.

  20. Pre-deployment preparation of military nurses of the South African National Defence Force for participation in peace support operations.

    PubMed

    Jumat, Jennifer D; Bezuidenhout, Marthie C; Neethling, Theodor G

    2014-11-25

    South Africa has dedicated itself to participate in peace support operations (PSOs). The concept of 'jointness', involving different arms of services, was adopted within the South African National Defence Force, thus involving nurses in PSOs. Combat-readiness being a prerequisite for those involved in PSOs raised questions as to the readiness of forces to participate in these missions. There is a need for specific nursing care during PSOs, but the role and functions of nurses during such operations were not clearly defined; thus their preparation for these missions had very little scientific grounding. These were to explore the pre-deployment preparation needs of military professional nurses during PSOs, and to describe the experience of these nurses whilst being deployed. A quantitative exploratory, descriptive and contextual approach was used. Questionnaires were distributed to 99 professional nurses who had deployment experience, and 72 participated (73% response rate). Relevant peace mission concepts are the environment, jointness, behaviour and mission readiness, which served as the conceptual bases for the study. Findings indicated that the nurses were not fully informed of their responsibilities during deployment or the circumstances under which they would have to work and live. Their preparation is not fully integrated with that of the other armed forces, and deficiencies in their training and development were identified which negatively impact on their mission readiness. Recommendations were made in terms of human resource requirements, psychological training, better integration of jointness training, and content of training and development to ensure mission readiness of nurses.

  1. A space release/deployment system actuated by shape memory wires

    NASA Astrophysics Data System (ADS)

    Fragnito, Marino; Vetrella and, Sergio

    2002-11-01

    In this paper, the design of an innovative hold down/release and deployment device actuated by shape memory wires, to be used for the first time for the S MA RT microsatellite solar wings is shown. The release and deployment mechanisms are actuated by a Shape Memory wire (Nitinol), which allows a complete symmetrical and synchronous release, in a very short time, of the four wings in pairs. The hold down kinematic mechanism is preloaded to avoid vibration nonlinearities and unwanted deployment at launch. The deployment mechanism is a simple pulley system. The stiffness of the deployed panel-hinge system needs to be dimensioned in order to meet the on-orbit requirement for attitude control. One-way roller clutches are used to keep the panel at the desired angle during the mission. An ad hoc software has been developed to simulate both the release and deployment operations, coupling the SMA wire behavior with the system mechanics.

  2. Six pitfalls in firewall deployment

    NASA Astrophysics Data System (ADS)

    Wilner, Bruce

    1996-03-01

    This note describes six key pitfalls in the deployment of popular commercial firewalls. The term `deployment' is intended to include the architecture of the firewall software itself, the integration of the firewall with the operating system platform, and the interconnection of the complete hardware/software combination within its target environment. After reviewing the evolution of Internet firewalls against the backdrop of classical trusted systems development, specific flaws and oversights in the familiar commercial deployments are analyzed in some detail. While significantly costlier solutions are available that address some of these problems, the analysis is applicable to the overwhelming majority of firewalls in use at both commercial and Government installations.

  3. Cost Benefit Analysis of MARSOC Marines in the Naval Postgraduate School Department of Defense Analysis

    DTIC Science & Technology

    2011-12-01

    Policy. Graduates will develop an ability to think strategically, analyze past operations, and apply historical lessons to future joint and combined...Naval Special Warfare Development Group O-## Officer, ## Rank OPMEP Officer, Professional Military Education Program OPTEMPO Operational Tempo...Marine Corps. 2 Joint Special Operations University (2007). MCSOCOM Prrof of Concept Deployment Evaluation Report. Hurlburt Field : Joint Special

  4. Development and Deployment of Unmanned Aircraft Instrumentation for Measuring Quantities Related to Land Surface-Atmosphere Interactions

    NASA Astrophysics Data System (ADS)

    de Boer, G.; Lawrence, D.; Elston, J.; Argrow, B. M.; Palo, S. E.; Curry, N.; Finamore, W.; Mack, J.; LoDolce, G.; Schmid, B.; Long, C. N.; Bland, G.; Maslanik, J. A.; Gao, R. S.; Telg, H.; Semmer, S.; Maclean, G.; Ivey, M.; Hock, T. F.; Bartram, B.; Bendure, A.; Stachura, M.

    2015-12-01

    Use of unmanned aircraft systems (UAS) in evaluation of geophysical parameters is expanding at a rapid rate. Despite limitation imposed by necessary regulations related to operation of UAS in the federal airspace, several groups have developed and deployed a variety of UAS and the associated sensors to make measurements of the atmosphere, land surface, ocean and cryosphere. Included in this grouping is work completed at the University of Colorado - Boulder, which has an extended history of operating UAS and expanding their use in the earth sciences. Collaborative projects between the department of Aerospace Engineering, the Cooperative Institute for Research in Environmental Sciences (CIRES), the Research and Engineering Center for Unmanned Vehicles (RECUV), the National Oceanographic and Atmospheric Administration (NOAA) and National Centers for Atmospheric Research (NCAR) have resulted in deployment of UAS to a variety of environments, including the Arctic. In this presentation, I will give an overview of some recent efforts lead by the University of Colorado to develop and deploy a variety of UAS. Work presented will emphasize recent campaigns and instrument development and testing related to understanding the land-atmosphere interface. Specifically, information on systems established for evaluating surface radiation (including albedo), turbulent exchange of water vapor, heat and gasses, and aerosol processes will be presented, along with information on the use of terrestrial ecosystem sensing to provide critical measurments for the evaluation of lower atmospheric flux measurements.

  5. Review of deployment technology for tethered satellite systems

    NASA Astrophysics Data System (ADS)

    Yu, B. S.; Wen, H.; Jin, D. P.

    2018-03-01

    Tethered satellite systems (TSSs) have attracted significant attention due to their potential and valuable applications for scientific research. With the development of various launched on-orbit missions, the deployment of tethers is considered a crucial technology for operation of a TSS. Both past orbiting experiments and numerical results have shown that oscillations of the deployed tether due to the Coriolis force and environmental perturbations are inevitable and that the impact between the space tether and end-body at the end of the deployment process leads to complicated nonlinear phenomena. Hence, a set of suitable control methods plays a fundamental role in tether deployment. This review article summarizes previous work on aspects of the dynamics, control, and ground-based experiments of tether deployment. The relevant basic principles, analytical expressions, simulation cases, and experimental results are presented as well.

  6. The effect of enemy combat tactics on PTSD prevalence rates: A comparison of Operation Iraqi Freedom deployment phases in a sample of male and female veterans.

    PubMed

    Green, Jonathan D; Bovin, Michelle J; Erb, Sarah E; Lachowicz, Mark; Gorman, Kaitlyn R; Rosen, Raymond C; Keane, Terence M; Marx, Brian P

    2016-09-01

    Research suggests that the nature of combat may affect later development of posttraumatic stress disorder (PTSD) in combat veterans. Studies comparing rates of PTSD across different conflicts indicate that the use of asymmetric or guerilla-style tactics by enemy fighters may result in higher rates of PTSD among U.S. military personnel than the use of symmetric tactics, which mirror tactics used by U.S. forces. Investigations of the association between enemy combat tactics and PTSD across conflicts were limited because of cohort effects and a focus on male veterans. The current study examined rates of PTSD diagnosis in a sample of male and female veterans deployed to Operation Iraqi Freedom (OIF), a conflict with 3 distinct phases marked by varying enemy tactics. Participants were 738 veterans enrolled in Project VALOR (Veterans' After-Discharge Longitudinal Registry) who deployed once to OIF. Participants completed a clinician interview as well as self-report measures. Male veterans deployed during the OIF phase marked by asymmetric tactics were more than twice as likely to be diagnosed with PTSD as those deployed during the other 2 phases, even after controlling for extent of combat exposure, demographic characteristics, and other deployment-related risk factors for PTSD. Differing rates of PTSD across the 3 OIF phases were not observed among female participants. The nature of combat (specifically, asymmetric enemy tactics) may be a risk factor for the development of PTSD among males. Factors other than enemy tactics may be more important to the development of PTSD among females. (PsycINFO Database Record (c) 2016 APA, all rights reserved).

  7. Training School Pupils in the Scientific Method: Student Participation in an International VLF Radio Experiment

    ERIC Educational Resources Information Center

    Denton, J. J.; Denton, M. H.; Kavanagh, A. J.; Harron, H.; Ulich, T.; Denton, J. S.

    2012-01-01

    We report on a school-university collaboration to involve students in the deployment, testing, and operation of a very low frequency (VLF) radio receiver as part of an international network of such experiments. A background to the collaboration is presented, along with a summary of planning and development, and the ultimate deployment of the…

  8. State of Montana ITS/CVO business plan : intelligent transportation system commercial vehicle operations

    DOT National Transportation Integrated Search

    1998-01-01

    This plans purpose is to encourage coordinated, efficient and safe commercial vehicle operations throughout Montana, and to promote inter-agency and regional cooperation as ITS/CVO projects are developed and deployed. The Plan discusses Montana...

  9. Sao Paulo Lightning Mapping Array (SP-LMA): Deployment and Plans

    NASA Technical Reports Server (NTRS)

    Bailey, J. C.; Carey, L. D.; Blakeslee, R. J.; Albrecht, R.; Morales, C. A.; Pinto, O., Jr.

    2011-01-01

    An 8-10 station Lightning Mapping Array (LMA) network is being deployed in the vicinity of Sao Paulo to create the SP-LMA for total lightning measurements in association with the international CHUVA [Cloud processes of tHe main precipitation systems in Brazil: A contribUtion to cloud resolVing modeling and to the GPM (GlobAl Precipitation Measurement)] field campaign. Besides supporting CHUVA science/mission objectives and the Sao Luz Paraitinga intensive operation period (IOP) in December 2011-January 2012, the SP-LMA will support the generation of unique proxy data for the Geostationary Lightning Mapper (GLM) and Advanced Baseline Imager (ABI), both sensors on the NOAA Geostationary Operational Environmental Satellite-R (GOES-R), presently under development and scheduled for a 2015 launch. The proxy data will be used to develop and validate operational algorithms so that they will be ready for use on "day1" following the launch of GOES-R. A preliminary survey of potential sites in the vicinity of Sao Paulo was conducted in December 2009 and January 2010, followed up by a detailed survey in July 2010, with initial network deployment scheduled for October 2010. However, due to a delay in the Sa Luz Paraitinga IOP, the SP-LMA will now be installed in July 2011 and operated for one year. Spacing between stations is on the order of 15-30 km, with the network "diameter" being on the order of 30-40 km, which provides good 3-D lightning mapping 150 km from the network center. Optionally, 1-3 additional stations may be deployed in the vicinity of Sa Jos dos Campos.

  10. Postdeployment symptom changes and traumatic brain injury and/or posttraumatic stress disorder in men.

    PubMed

    Macera, Caroline A; Aralis, Hilary J; Macgregor, Andrew J; Rauh, Mitchell J; Galarneau, Michael R

    2012-01-01

    In Operation Iraqi Freedom and Operation Enduring Freedom, blast-related injuries associated with combat are frequent and can result in traumatic brain injury (TBI) symptoms that may be difficult to distinguish from psychological problems. Using data from the Post-Deployment Health Assessment and Reassessment, we identified 12,046 male U.S. Navy sailors and Marines with reported combat exposure from 2008 to 2009. Symptoms potentially associated with blast-related TBI and posttraumatic stress disorder (PTSD) that were reported immediately after deployment were compared with symptoms present several months later. Our study supports others that have found that subjects with blast-related injuries may experience the development or worsening of symptoms during the months following deployment. Additionally, our study found that those who screened positive for PTSD and TBI formed a unique group, with the presence of TBI exacerbating development of PTSD symptoms at reassessment. Providers should recognize the late development of symptoms, consider the possibility of comorbidity, and be prepared to treat multiple symptoms rather than a specific diagnostic category.

  11. VAP/VAT: video analytics platform and test bed for testing and deploying video analytics

    NASA Astrophysics Data System (ADS)

    Gorodnichy, Dmitry O.; Dubrofsky, Elan

    2010-04-01

    Deploying Video Analytics in operational environments is extremely challenging. This paper presents a methodological approach developed by the Video Surveillance and Biometrics Section (VSB) of the Science and Engineering Directorate (S&E) of the Canada Border Services Agency (CBSA) to resolve these problems. A three-phase approach to enable VA deployment within an operational agency is presented and the Video Analytics Platform and Testbed (VAP/VAT) developed by the VSB section is introduced. In addition to allowing the integration of third party and in-house built VA codes into an existing video surveillance infrastructure, VAP/VAT also allows the agency to conduct an unbiased performance evaluation of the cameras and VA software available on the market. VAP/VAT consists of two components: EventCapture, which serves to Automatically detect a "Visual Event", and EventBrowser, which serves to Display & Peruse of "Visual Details" captured at the "Visual Event". To deal with Open architecture as well as with Closed architecture cameras, two video-feed capture mechanisms have been developed within the EventCapture component: IPCamCapture and ScreenCapture.

  12. Uses of tethered atmospheric research probes

    NASA Technical Reports Server (NTRS)

    Deloach, Richard

    1991-01-01

    In situ measurements in the lower thermosphere are rare because of the difficulty of reaching these altitudes with conventional instrument platforms. The emerging technology of tethered satellites as a means to probe these altitudes from above has matured to the point that a flight program is planned to verify the operational performance of a low-cost deployer mechanism for tethered satellites, and to demonstrate a basic understanding of the dynamics of tethered satellite deployment. With such operational developments at hand, it is appropriate to review some of the potential applications of tethered measurement platforms for acquiring in situ data in the upper atmosphere. This paper focuses on downward-deployed tethered satellite measurements of interest to atmospheric scientists and to hypersonic aerodynamicists, and discusses ways in which this technology may be able to support selected long-range research programs currently in progress or in various stages of pre-flight development. The intent is to illustrate for the potential user community some of the unique advantages of tethered measurement platform technology now under development, and to stimulate creative thinking about ways in which this new capability may be used in support of future research programs.

  13. Supporting deployed operations: are military nurses gaining the relevant experience from MDHUs to be competent in deployed operations?

    PubMed

    Beaumont, Steven P; Allan, Helen T

    2014-01-01

    To explore how peacetime employment of military nurses in the UK National Health Service Medical Defence Hospital Units prepares them to be competent to practise in their role on deployment. Military secondary care nurses are employed within UK National Health Service Trusts to gain clinical experience that will be relevant to their military nursing role. A two-stage grounded theory study using mixed methods: postal questionnaire survey and in-depth interviews. In stage one a postal questionnaire was distributed to all serving military nurses. Stage two involved 12 semi-structured interviews. The data from both parts of the study were analysed using grounded theory. Four categories and one core category were identified, which suggested that participants did not feel fully prepared for deployment. Their feelings of preparedness increased with deployment experience and decreased when the nature of injuries seen on deployment changed. Respondents argued that even when unprepared, they did not feel incompetent. The findings suggest that the peacetime clinical experience gained in the National Health Service did not always develop the necessary competencies to carry out roles as military nurses on deployment. This study highlights the unique role of military nurses. We discuss these findings in the light of the literature on competency and expertise. The military nurses in this study did not feel fully prepared for deployed operations. We propose a new model for how military nurses could gain relevant experience from their National Health Service placements. National Health Service clinical placements need to be reassessed regularly to ensure that they are meeting military nurses' clinical requirements. Experiences of nurses returning from deployment could be shared and used as a basis for reflection and learning within National Health Service Trusts and also inform decisions regarding the appropriateness of clinical placements for qualified military nurses. © 2012 Blackwell Publishing Ltd.

  14. Remote Systems Design & Deployment

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bailey, Sharon A.; Baker, Carl P.; Valdez, Patrick LJ

    2009-08-28

    The Pacific Northwest National Laboratory (PNNL) was tasked by Washington River Protection Solutions, LLC (WRPS) to provide information and lessons learned relating to the design, development and deployment of remote systems, particularly remote arm/manipulator systems. This report reflects PNNL’s experience with remote systems and lays out the most important activities that need to be completed to successfully design, build, deploy and operate remote systems in radioactive and chemically contaminated environments. It also contains lessons learned from PNNL’s work experiences, and the work of others in the national laboratory complex.

  15. Families overcoming under stress: implementing family-centered prevention for military families facing wartime deployments and combat operational stress.

    PubMed

    Lester, Patricia; Mogil, Catherine; Saltzman, William; Woodward, Kirsten; Nash, William; Leskin, Gregory; Bursch, Brenda; Green, Sara; Pynoos, Robert; Beardslee, William

    2011-01-01

    The toll of multiple and prolonged deployments on families has become clearer in recent years as military families have seen an increase in childhood anxiety, parental psychological distress, and marital discord. Families overcoming under stress (FOCUS), a family-centered evidence-informed resiliency training program developed at University of California, Los Angeles and Harvard Medical School, is being implemented at military installations through an initiative from Navy Bureau of Medicine and Surgery. The research foundation for FOCUS includes evidence-based preventive interventions that were adapted to meet the specific needs of military families facing combat operational stress associated with wartime deployments. Using a family narrative approach, FOCUS includes a customized approach utilizing core intervention components, including psychoeducation, emotional regulation skills, goal setting and problem solving skills, traumatic stress reminder management techniques, and family communication skills. The purpose of this study is to describe the development and implementation of FOCUS for military families. A case example is also presented.

  16. Evaluation of Anomaly Detection Capability for Ground-Based Pre-Launch Shuttle Operations. Chapter 8

    NASA Technical Reports Server (NTRS)

    Martin, Rodney Alexander

    2010-01-01

    This chapter will provide a thorough end-to-end description of the process for evaluation of three different data-driven algorithms for anomaly detection to select the best candidate for deployment as part of a suite of IVHM (Integrated Vehicle Health Management) technologies. These algorithms were deemed to be sufficiently mature enough to be considered viable candidates for deployment in support of the maiden launch of Ares I-X, the successor to the Space Shuttle for NASA's Constellation program. Data-driven algorithms are just one of three different types being deployed. The other two types of algorithms being deployed include a "nile-based" expert system, and a "model-based" system. Within these two categories, the deployable candidates have already been selected based upon qualitative factors such as flight heritage. For the rule-based system, SHINE (Spacecraft High-speed Inference Engine) has been selected for deployment, which is a component of BEAM (Beacon-based Exception Analysis for Multimissions), a patented technology developed at NASA's JPL (Jet Propulsion Laboratory) and serves to aid in the management and identification of operational modes. For the "model-based" system, a commercially available package developed by QSI (Qualtech Systems, Inc.), TEAMS (Testability Engineering and Maintenance System) has been selected for deployment to aid in diagnosis. In the context of this particular deployment, distinctions among the use of the terms "data-driven," "rule-based," and "model-based," can be found in. Although there are three different categories of algorithms that have been selected for deployment, our main focus in this chapter will be on the evaluation of three candidates for data-driven anomaly detection. These algorithms will be evaluated upon their capability for robustly detecting incipient faults or failures in the ground-based phase of pre-launch space shuttle operations, rather than based oil heritage as performed in previous studies. Robust detection will allow for the achievement of pre-specified minimum false alarm and/or missed detection rates in the selection of alert thresholds. All algorithms will also be optimized with respect to an aggregation of these same criteria. Our study relies upon the use of Shuttle data to act as was a proxy for and in preparation for application to Ares I-X data, which uses a very similar hardware platform for the subsystems that are being targeted (TVC - Thrust Vector Control subsystem for the SRB (Solid Rocket Booster)).

  17. Supporting Persistent and Networked Special Operations Forces (SOF) Operations: Insights From Forward-Deployed SOF Personnel

    DTIC Science & Technology

    2017-01-01

    network of people and technology to provide sustained, persistent, SOF-specific capabilities and capacities and increased persistent forward- deployed...phase 1 operational activities of forward-deployed SOF personnel and the factors that critically influence the outcomes of their tactical operations can...chronized network of people and technology that provides sustained, persistent, SOF- specific capabilities and capacities and increased persistent

  18. Sample Acquisition and Instrument Deployment (SAID)

    NASA Technical Reports Server (NTRS)

    Boyd, Robert C.

    1994-01-01

    This report details the interim progress for contract NASW-4818, Sample Acquisition and Instrument Deployment (SAID), a robotic system for deploying science instruments and acquiring samples for analysis. The system is a conventional four degree of freedom manipulator 2 meters in length. A baseline design has been achieved through analysis and trade studies. The design considers environmental operating conditions on the surface of Mars, as well as volume constraints on proposed Mars landers. Control issues have also been studied, and simulations of joint and tip movements have been performed. A passively braked shape memory actuator with the ability to measure load has been developed. The wrist also contains a mechanism which locks the lid output to the bucket so that objects can be grasped and released for instrument deployment. The wrist actuator has been tested for operational power and mechanical functionality at Mars environmental conditions. The torque which the actuator can produce has been measured. Also, testing in Mars analogous soils has been performed.

  19. Deployment Area Selection and Land Withdrawal/Acquisition. M-X/MPS (M-X/Multiple Protective Shelter) Environmental Technical Report. Economic Model.

    DTIC Science & Technology

    1981-10-02

    Estimated non-residential building development . 176 D-I Correspondence between RIMS sectors and 1974 Census of Agriculture reporting categories. 185 D-2...deployment would be the development of new economic sectors . For example, building an M-X operating N.’ base or DDA facilities in a county would be likely...construction sectors . For the rural Nevada/Utah ROI counties, many of these location quotients are significantly less than one and in many cases zero because

  20. Lunar-based optical telescopes: Planning astronomical tools of the twenty-first century

    NASA Astrophysics Data System (ADS)

    Hilchey, J. D.; Nein, M. E.

    1995-02-01

    A succession of optical telescopes, ranging in aperture from 1 to 16 m or more, can be deployed and operated on the lunar surface over the next half-century. These candidates to succeed NASA's Great Observatories would capitalize on the unique observational advantages offered by the Moon. The Lunar Telescope Working Group and the LUTE Task Team of the George C. Marshall Space Flight Center (MSFC) have assessed the feasibility of developing and deploying these facilities. Studies include the 16-m Large Lunar Telescope (LLT); the Lunar Cluster Telescope Experiment (LCTE), a 4-m precursor to the LLT; the 2-m Lunar Transit Telescope (LTT); and its precursor, the 1-m Lunar Ultraviolet Telescope Experiment (LUTE). The feasibility of developing and deploying each telescope was assessed and system requirements and options for supporting technologies, subsystems, transportation, and operations were detailed. Influences of lunar environment factors and site selection on telescope design and operation were evaluated, and design approaches and key tradeoffs were established. This paper provides an overview of the study results. Design concepts and brief system descriptions are provided, including subsystem and mission options selected for the concepts.

  1. An annotated outline for a traffic management center operations manual

    DOT National Transportation Integrated Search

    2000-10-01

    This draft Traffic Management Center (TMC) and Operations manual outline is meant to serve as a model "checklist" for the development of similar manuals used in deployed environments. The purpose of this outline is to provide a reference for agencies...

  2. Utility of the Department of Defense Serum Repository in Assessing Deployment Exposure.

    PubMed

    Lushniak, Boris; Mallon, Col Timothy M; Gaydos, Joel C; Smith, David J

    2016-08-01

    This paper describes why the research project was conducted in terms of demonstrating the utility of the Department of Defense Serum Repository in addressing deployment environmental exposures. The history deployment exposure surveillance was reviewed and the rationale for developing validated biomarkers that were detected in sera in postdeployment samples and compared with nondeployed controls was described. The goal was to find validated biomarkers that are associated with both exposures and health outcomes. The articles in this supplement described novel serum biomarkers that were found to be associated with deployment exposures and weakly associated with some health outcomes. Future research must continue to validate the use of serum biomarkers when operational contingencies prevent the gold standard collection of real-time breathing zone samples in deployed service members.

  3. Web Application Software for Ground Operations Planning Database (GOPDb) Management

    NASA Technical Reports Server (NTRS)

    Lanham, Clifton; Kallner, Shawn; Gernand, Jeffrey

    2013-01-01

    A Web application facilitates collaborative development of the ground operations planning document. This will reduce costs and development time for new programs by incorporating the data governance, access control, and revision tracking of the ground operations planning data. Ground Operations Planning requires the creation and maintenance of detailed timelines and documentation. The GOPDb Web application was created using state-of-the-art Web 2.0 technologies, and was deployed as SaaS (Software as a Service), with an emphasis on data governance and security needs. Application access is managed using two-factor authentication, with data write permissions tied to user roles and responsibilities. Multiple instances of the application can be deployed on a Web server to meet the robust needs for multiple, future programs with minimal additional cost. This innovation features high availability and scalability, with no additional software that needs to be bought or installed. For data governance and security (data quality, management, business process management, and risk management for data handling), the software uses NAMS. No local copy/cloning of data is permitted. Data change log/tracking is addressed, as well as collaboration, work flow, and process standardization. The software provides on-line documentation and detailed Web-based help. There are multiple ways that this software can be deployed on a Web server to meet ground operations planning needs for future programs. The software could be used to support commercial crew ground operations planning, as well as commercial payload/satellite ground operations planning. The application source code and database schema are owned by NASA.

  4. Coexistence or Operational Necessity: The Role of Formally Structured Organisation and Informal Networks during Deployments

    DTIC Science & Technology

    2011-06-01

    informal communication and informal networks which provide the quickest means of communication in organisations . These informal groupings develop ...promote creativity through sensemaking and self- organisation will better enable the military to respond to environmental changes (McDaniel, 2007... need to be addressed to facilitate the co-existence of formal organisation and informal networks during deployments? The military in general and

  5. Applied Operations Research: Operator's Assistant

    NASA Technical Reports Server (NTRS)

    Cole, Stuart K.

    2015-01-01

    NASA operates high value critical equipment (HVCE) that requires trouble shooting, periodic maintenance and continued monitoring by Operations staff. The complexity HVCE and information required to maintain and trouble shoot HVCE to assure continued mission success as paper is voluminous. Training on new HVCE is commensurate with the need for equipment maintenance. LaRC Research Directorate has undertaken a proactive research to support Operations staff by initiation of the development and prototyping an electronic computer based portable maintenance aid (Operator's Assistant). This research established a goal with multiple objectives and a working prototype was developed. The research identified affordable solutions; constraints; demonstrated use of commercial off the shelf software; use of the US Coast Guard maintenance solution; NASA Procedure Representation Language; and the identification of computer system strategies; where these demonstrations and capabilities support the Operator, and maintenance. The results revealed validation against measures of effectiveness and overall proved a substantial training and capability sustainment tool. The research indicated that the OA could be deployed operationally at the LaRC Compressor Station with an expectation of satisfactorily results and to obtain additional lessons learned prior to deployment at other LaRC Research Directorate Facilities. The research revealed projected cost and time savings.

  6. The Ensemble Canon

    NASA Technical Reports Server (NTRS)

    MIittman, David S

    2011-01-01

    Ensemble is an open architecture for the development, integration, and deployment of mission operations software. Fundamentally, it is an adaptation of the Eclipse Rich Client Platform (RCP), a widespread, stable, and supported framework for component-based application development. By capitalizing on the maturity and availability of the Eclipse RCP, Ensemble offers a low-risk, politically neutral path towards a tighter integration of operations tools. The Ensemble project is a highly successful, ongoing collaboration among NASA Centers. Since 2004, the Ensemble project has supported the development of mission operations software for NASA's Exploration Systems, Science, and Space Operations Directorates.

  7. Methodology for urban rail and construction technology research and development planning

    NASA Technical Reports Server (NTRS)

    Rubenstein, L. D.; Land, J. E.; Deshpande, G.; Dayman, B.; Warren, E. H.

    1980-01-01

    A series of transit system visits, organized by the American Public Transit Association (APTA), was conducted in which the system operators identified the most pressing development needs. These varied by property and were reformulated into a series of potential projects. To assist in the evaluation, a data base useful for estimating the present capital and operating costs of various transit system elements was generated from published data. An evaluation model was developed which considered the rate of deployment of the research and development project, potential benefits, development time and cost. An outline of an evaluation methodology that considered benefits other than capital and operating cost savings was also presented. During the course of the study, five candidate projects were selected for detailed investigation; (1) air comfort systems; (2) solid state auxiliary power conditioners; (3) door systems; (4) escalators; and (5) fare collection systems. Application of the evaluation model to these five examples showed the usefulness of modeling deployment rates and indicated a need to increase the scope of the model to quantitatively consider reliability impacts.

  8. A system concept for gradual deployment of geostationary lightsats

    NASA Astrophysics Data System (ADS)

    Peters, Graham C.; Garry, James R. C.

    1993-10-01

    Small satellites provide an attractive option for developing countries wishing to own and operate a satellite for the first time. It is proposed that space segment capacity could be built-up in response to increasing traffic requirements by launching small satellites at intervals into a single orbital slot to form a cluster. This paper, which results from an ESA study, reviews the various system aspects which must be considered and develops a suitable approach for multi-satellite deployment and collocation. Particular attention is paid to the system and payload configuration required to achieve effective mutual sparing between the satellites' payloads as the constellation is expanded. Mission and operational aspects are examined to obtain an acceptable risk of collisions between the satellites in a single orbit slot. The complexity and cost of operations are investigated to obtain the optimum size of satellite required to satisfy different demand requirements taken from real market scenarios.

  9. Comparative thermal analysis of the Space Station Freedom photovoltaic deployable boom structure using TRASYS, NEVADA, and SINDA programs

    NASA Technical Reports Server (NTRS)

    Baumeister, Joseph F.; Beach, Duane E.; Armand, Sasan C.

    1989-01-01

    The proposed Space Station Photovoltaic Deployable Boom was analyzed for operating temperatures. The boom glass/epoxy structure design needs protective shielding from environmental degradation. The protective shielding optical properties (solar absorptivity and emissivity) dictate the operating temperatures of the boom components. The Space Station Boom protective shielding must also withstand the effects of the extendible/retractable coiling acting within the mast canister. A thermal analysis method was developed for the Space Station Deployable Boom to predict transient temperatures for a variety of surface properties. The modeling procedures used to evaluate temperatures within the boom structure incorporated the TRASYS, NEVADA, and SINDA thermal analysis programs. Use of these programs led to a comparison between TRASYS and NEVADA analysis methods. Comparing TRASYS and NEVADA results exposed differences in the environmental solar flux predictions.

  10. Comparative thermal analysis of the space station Freedom photovoltaic deployable boom structure using TRASYS, NEVADA, and SINDA programs

    NASA Technical Reports Server (NTRS)

    Baumeister, Joseph F.; Beach, Duane E.; Armand, Sasan C.

    1989-01-01

    The proposed Space Station Photovoltaic Deployable Boom was analyzed for operating temperatures. The boom glass/epoxy structure design needs protective shielding from environmental degradation. The protective shielding optical properties (solar absorptivity and emissivity) dictate the operating temperatures of the boom components. The Space Station Boom protective shielding must also withstand the effects of the extendible/retractable coiling action within the mast canister. A thermal analysis method was developed for the Space Station Deployable Boom to predict transient temperatures for a variety of surface properties. The modeling procedures used to evaluate temperatures within the boom structure incorporated the TRASYS, NEVADA, and SINDA thermal analysis programs. Use of these programs led to a comparison between TRASYS and NEVADA analysis methods. Comparing TRASYS and NEVADA results exposed differences in the environmental solar flux predictions.

  11. Traumatic events, other operational stressors and physical and mental health reported by Australian Defence Force personnel following peacekeeping and war-like deployments

    PubMed Central

    2012-01-01

    Background The association between stressful events on warlike deployments and subsequent mental health problems has been established. Less is known about the effects of stressful events on peacekeeping deployments. Methods Two cross sectional studies of the Australian Defence Force were used to contrast the prevalence of exposures reported by a group deployed on a peacekeeping operation (Bougainville, n = 1704) and those reported by a group deployed on operations which included warlike and non-warlike exposures (East Timor, n = 1333). A principal components analysis was used to identify groupings of non-traumatic exposures on deployment. Multiple regression models were used to assess the association between self-reported objective and subjective exposures, stressors on deployment and subsequent physical and mental health outcomes. Results The principal components analysis produced four groups of non-traumatic stressors which were consistent between the peacekeeping and more warlike deployments. These were labelled ‘separation’, ‘different culture’, ‘other people’ and ‘work frustration’. Higher levels of traumatic and non-traumatic exposures were reported by veterans of East Timor compared to Bougainville. Higher levels of subjective traumatic exposures were associated with increased rates of PTSD in East Timor veterans and more physical and psychological health symptoms in both deployed groups. In Bougainville and East Timor veterans some non-traumatic deployment stressors were also associated with worse health outcomes. Conclusion Strategies to best prepare, identify and treat those exposed to traumatic events and other stressors on deployment should be considered for Defence personnel deployed on both warlike and peacekeeping operations. PMID:22830494

  12. Traumatic events, other operational stressors and physical and mental health reported by Australian Defence Force personnel following peacekeeping and war-like deployments.

    PubMed

    Waller, Michael; Treloar, Susan A; Sim, Malcolm R; McFarlane, Alexander C; McGuire, Annabel C L; Bleier, Jonathan; Dobson, Annette J

    2012-07-26

    The association between stressful events on warlike deployments and subsequent mental health problems has been established. Less is known about the effects of stressful events on peacekeeping deployments. Two cross sectional studies of the Australian Defence Force were used to contrast the prevalence of exposures reported by a group deployed on a peacekeeping operation (Bougainville, n = 1704) and those reported by a group deployed on operations which included warlike and non-warlike exposures (East Timor, n = 1333). A principal components analysis was used to identify groupings of non-traumatic exposures on deployment. Multiple regression models were used to assess the association between self-reported objective and subjective exposures, stressors on deployment and subsequent physical and mental health outcomes. The principal components analysis produced four groups of non-traumatic stressors which were consistent between the peacekeeping and more warlike deployments. These were labelled 'separation', 'different culture', 'other people' and 'work frustration'. Higher levels of traumatic and non-traumatic exposures were reported by veterans of East Timor compared to Bougainville. Higher levels of subjective traumatic exposures were associated with increased rates of PTSD in East Timor veterans and more physical and psychological health symptoms in both deployed groups. In Bougainville and East Timor veterans some non-traumatic deployment stressors were also associated with worse health outcomes. Strategies to best prepare, identify and treat those exposed to traumatic events and other stressors on deployment should be considered for Defence personnel deployed on both warlike and peacekeeping operations.

  13. Defense.gov - Special Report - Travels With Gates

    Science.gov Websites

    . Defense Secretary Robert M. Gates re-enlists soldiers deployed on Field Operating Base Airborne in the province of Kandahar. Story» Gates Develops 'To Do' List From Two-Day Afghan Visit FORWARD OPERATING BASE momentum. Story» Gates Assures 10th Mountain Soldiers of Continued Support FORWARD OPERATING BASE AIRBORNE

  14. Remote Operation of the ExoGeoLab Lander at ESTEC and Lunares Base

    NASA Astrophysics Data System (ADS)

    Lillo, A.; Foing, B. H.; Evellin, P.; Kołodziejczyk, A.; Jonglez, C.; Heinicke, C.; Harasymczuk, M.; Authier, L.; Blanc, A.; Chahla, C.; Tomic, A.; Mirino, M.; Schlacht, I.; Hettrich, S.; Pacher, T.

    2017-10-01

    The ExoGeoLab Lander is a prototype developed to demonstrate joint use of remote operation and EVA astronaut work in analogue lunar environment. It was recently deployed in the new analogue base Lunares in Poland and controlled from ESA ESTEC center.

  15. Sample acquisition and instrument deployment

    NASA Technical Reports Server (NTRS)

    Boyd, Robert C.

    1995-01-01

    Progress is reported in developing the Sample Acquisition and Instrument Deployment (SAID) system, a robotic system for deploying science instruments and acquiring samples for analysis. The system is a conventional four degree of freedom manipulator 2 meters in length. A baseline design has been achieved through analysis and trade studies. The design considers environmental operating conditions on the surface of Mars, as well as volume constraints on proposed Mars landers. Control issues have also been studied, and simulations of joint and tip movements have been performed. The systems have been fabricated and tested in environmental chambers, as well as soil testing and robotic control testing.

  16. Risk of Suicide Among US Military Service Members Following Operation Enduring Freedom or Operation Iraqi Freedom Deployment and Separation From the US Military.

    PubMed

    Reger, Mark A; Smolenski, Derek J; Skopp, Nancy A; Metzger-Abamukang, Melinda J; Kang, Han K; Bullman, Tim A; Perdue, Sondra; Gahm, Gregory A

    2015-06-01

    A pressing question in military suicide prevention research is whether deployment in support of Operation Enduring Freedom or Operation Iraqi Freedom relates to suicide risk. Prior smaller studies report differing results and often have not included suicides that occurred after separation from military service. To examine the association between deployment and suicide among all 3.9 million US military personnel who served during Operation Enduring Freedom or Operation Iraqi Freedom, including suicides that occurred after separation. This retrospective cohort design used administrative data to identify dates of deployment for all service members (October 7, 2001, to December 31, 2007) and suicide data (October 7, 2001, to December 31, 2009) to estimate rates of suicide-specific mortality. Hazard ratios were estimated from time-dependent Cox proportional hazards regression models to compare deployed service members with those who did not deploy. Suicide mortality from the Department of Defense Medical Mortality Registry and the National Death Index. Deployment was not associated with the rate of suicide (hazard ratio, 0.96; 99% CI, 0.87-1.05). There was an increased rate of suicide associated with separation from military service (hazard ratio, 1.63; 99% CI, 1.50-1.77), regardless of whether service members had deployed or not. Rates of suicide were also elevated for service members who separated with less than 4 years of military service or who did not separate with an honorable discharge. Findings do not support an association between deployment and suicide mortality in this cohort. Early military separation (<4 years) and discharge that is not honorable were suicide risk factors.

  17. Video Guidance Sensor for Surface Mobility Operations

    NASA Technical Reports Server (NTRS)

    Fernandez, Kenneth R.; Fischer, Richard; Bryan, Thomas; Howell, Joe; Howard, Ricky; Peters, Bruce

    2008-01-01

    Robotic systems and surface mobility will play an increased role in future exploration missions. Unlike the LRV during Apollo era which was an astronaut piloted vehicle future systems will include teleoperated and semi-autonomous operations. The tasks given to these vehicles will run the range from infrastructure maintenance, ISRU, and construction to name a few. A common task that may be performed would be the retrieval and deployment of trailer mounted equipment. Operational scenarios may require these operations to be performed remotely via a teleoperated mode,or semi-autonomously. This presentation describes the on-going project to adapt the Automated Rendezvous and Capture (AR&C) sensor developed at the Marshall Space Flight Center for use in an automated trailer pick-up and deployment operation. The sensor which has been successfully demonstrated on-orbit has been mounted on an iRobot/John Deere RGATOR autonomous vehicle for this demonstration which will be completed in the March 2008 time-frame.

  18. Road weather information system statewide implementation plan.

    DOT National Transportation Integrated Search

    2014-03-01

    The objective of this project was to develop a plan for deploying a statewide RWIS to support both current NYSDOT operations and future MDSS applications. To develop the plan, various information and data sources were investigated, including the curr...

  19. Fabrication and Testing of a Modular Micro-Pocket Fission Detector Instrumentation System for Test Nuclear Reactors

    NASA Astrophysics Data System (ADS)

    Reichenberger, Michael A.; Nichols, Daniel M.; Stevenson, Sarah R.; Swope, Tanner M.; Hilger, Caden W.; Roberts, Jeremy A.; Unruh, Troy C.; McGregor, Douglas S.

    2018-01-01

    Advancements in nuclear reactor core modeling and computational capability have encouraged further development of in-core neutron sensors. Measurement of the neutron-flux distribution within the reactor core provides a more complete understanding of the operating conditions in the reactor than typical ex-core sensors. Micro-Pocket Fission Detectors have been developed and tested previously but have been limited to single-node operation and have utilized highly specialized designs. The development of a widely deployable, multi-node Micro-Pocket Fission Detector assembly will enhance nuclear research capabilities. A modular, four-node Micro-Pocket Fission Detector array was designed, fabricated, and tested at Kansas State University. The array was constructed from materials that do not significantly perturb the neutron flux in the reactor core. All four sensor nodes were equally spaced axially in the array to span the fuel-region of the reactor core. The array was filled with neon gas, serving as an ionization medium in the small cavities of the Micro-Pocket Fission Detectors. The modular design of the instrument facilitates the testing and deployment of numerous sensor arrays. The unified design drastically improved device ruggedness and simplified construction from previous designs. Five 8-mm penetrations in the upper grid plate of the Kansas State University TRIGA Mk. II research nuclear reactor were utilized to deploy the array between fuel elements in the core. The Micro-Pocket Fission Detector array was coupled to an electronic support system which has been specially developed to support pulse-mode operation. The Micro-Pocket Fission Detector array composed of four sensors was used to monitor local neutron flux at a constant reactor power of 100 kWth at different axial locations simultaneously. The array was positioned at five different radial locations within the core to emulate the deployment of multiple arrays and develop a 2-dimensional measurement of neutron flux in the reactor core.

  20. QuickStrike ASOC Battlefield Simulation: Preparing the War Fighter to Win

    NASA Technical Reports Server (NTRS)

    Jones, Richard L.

    2010-01-01

    The QuickStrike ASOC (Air Support Operations Center) Battlefield Simulation fills a crucial gap in USAF and United Kingdom Close Air Support (CAS) and airspace manager training. The system now provides six squadrons with the capability to conduct total-mission training events whenever the personnel and time are available. When the 111th ASOC returned from their first deployment to Afghanistan they realized the training available prior to deployment was inadequate. They sought an organic training capability focused on the ASOC mission that was low cost, simple to use, adaptable, and available now. Using a commercial off-the-shelf simulation, they developed a complete training system by adapting the simulation to their training needs. Through more than two years of spiral development, incorporating lessons learned, the system has matured, and can now realistically replicate the Tactical Operations Center (TOC) in Kabul, Afghanistan, the TOC supporting the mission in Iraq, or can expand to support a major conflict scenario. The training system provides a collaborative workspace for the training audience and exercise control group via integrated software and workstations that can easily adapt to new mission reqUirements and TOC configurations. The system continues to mature. Based on inputs from the war fighter, new capabilities have been incorporated to add realism and simplify the scenario development process. The QuickStrike simulation can now import TBMCS Air Tasking Order air mission data and can provide air and ground tracks to a common operating picture; presented through either C2PC or JADOCS. This oranic capability to practice team processes and tasks and to conduct mission rehearsals proved its value in the 111 h ASOS's next deployment. The ease of scenario development and the simple to learn and intuitive gamelike interface enables the squadrons to develop and share scenarios incorporating lessons learned from every deployment. These war fighters have now filled the training gap and have the capability they need to train to win.

  1. 32 CFR 158.5 - Responsibilities.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... operational deployments, develop and submit lessons learned that result in improved best practices and... Director, Defense Manpower Data Center (DMDC), under the authority, direction, and control of the USD(P&R...

  2. 32 CFR 158.5 - Responsibilities.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... operational deployments, develop and submit lessons learned that result in improved best practices and... Director, Defense Manpower Data Center (DMDC), under the authority, direction, and control of the USD(P&R...

  3. 32 CFR 158.5 - Responsibilities.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... operational deployments, develop and submit lessons learned that result in improved best practices and... Director, Defense Manpower Data Center (DMDC), under the authority, direction, and control of the USD(P&R...

  4. Charged Particle lunar Environment Experiment (CPLEE)

    NASA Technical Reports Server (NTRS)

    Reasoner, D. L.

    1974-01-01

    Research development in the Charged Particle Lunar Environment Experiment (CPLEE) is reported. The CPLEE is ion-electron spectrometer placed on the lunar surface for the purpose of measuring charged particle fluxes impacting the moon from a variety of regions and to study the interactions between space plasmas and the lunar surface. The principal accomplishments reported include: (1) furnishing design specifications for construction of the CPLEE instruments; (2) development of an advanced computer-controlled facility for automated instrument calibration; (3) active participation in the deployment and past-deployment operational phases with regard to data verification and operational mode selection; and (4) publication of research papers, including a study of lunar photoelectrons, a study of plasmas resulting from man-made lunar impart events, a study of magnetotail and magnetosheath particle populations, and a study of solar-flare interplanetary particles.

  5. Deployment and Evaluation of the Helicopter In-Flight Tracking System (HITS)

    NASA Technical Reports Server (NTRS)

    Daskalakis, Anastasios; Martone, Patrick

    2004-01-01

    The Gulf of Mexico airspace has two major operating regions: low altitude offshore (below 7,000 ft) and high altitude oceanic (above 18,000 ft). Both regions suffer significant inefficiencies due to the lack of continuous surveillance during Instrument Flight Rules operations. Provision of surveillance in the offshore region is hindered by its low-altitude nature, which makes coverage by conventional radars economically infeasible. Significant portions of the oceanic sectors are inaccessible to shore-based sensors, as they are beyond line-of-sight. Two emerging surveillance technologies were assessed that are relatively low cost and can be deployed on offshore platforms Wide Area Multilateration and Automatic Dependent Surveillance Broadcast. Performance criteria were formulated using existing FAA specifications. Three configurations were developed and deployed representative of systems serving full-size and reduced-sized domestic terminal areas and an en-route/oceanic region. These configurations were evaluated during nine flight test periods using fixed- and rotary-wing aircraft.

  6. Space Station - An integrated approach to operational logistics support

    NASA Technical Reports Server (NTRS)

    Hosmer, G. J.

    1986-01-01

    Development of an efficient and cost effective operational logistics system for the Space Station will require logistics planning early in the program's design and development phase. This paper will focus on Integrated Logistics Support (ILS) Program techniques and their application to the Space Station program design, production and deployment phases to assure the development of an effective and cost efficient operational logistics system. The paper will provide the methodology and time-phased programmatic steps required to establish a Space Station ILS Program that will provide an operational logistics system based on planned Space Station program logistics support.

  7. Motion and ranging sensor system for through-the-wall surveillance system

    NASA Astrophysics Data System (ADS)

    Black, Jeffrey D.

    2002-08-01

    A portable Through-the-Wall Surveillance System is being developed for law enforcement, counter-terrorism, and military use. The Motion and Ranging Sensor is a radar that operates in a frequency band that allows for surveillance penetration of most non-metallic walls. Changes in the sensed radar returns are analyzed to detect the human motion that would typically be present during a hostage or barricaded suspect scenario. The system consists of a Sensor Unit, a handheld Remote Display Unit, and an optional laptop computer Command Display Console. All units are battery powered and a wireless link provides command and data communication between units. The Sensor Unit is deployed close to the wall or door through which the surveillance is to occur. After deploying the sensor the operator may move freely as required by the scenario. Up to five Sensor Units may be deployed at a single location. A software upgrade to the Command Display Console is also being developed. This software upgrade will combine the motion detected by multiple Sensor Units and determine and track the location of detected motion in two dimensions.

  8. Nanosatellite constellation deployment using on-board magnetic torquer interaction with space plasma

    NASA Astrophysics Data System (ADS)

    Park, Ji Hyun; Matsuzawa, Shinji; Inamori, Takaya; Jeung, In-Seuck

    2018-04-01

    One of the advantages that drive nanosatellite development is the potential of multi-point observation through constellation operation. However, constellation deployment of nanosatellites has been a challenge, as thruster operations for orbit maneuver were limited due to mass, volume, and power. Recently, a de-orbiting mechanism using magnetic torquer interaction with space plasma has been introduced, so-called plasma drag. As no additional hardware nor propellant is required, plasma drag has the potential in being used as constellation deployment method. In this research, a novel constellation deployment method using plasma drag is proposed. Orbit decay rate of the satellites in a constellation is controlled using plasma drag in order to achieve a desired phase angle and phase angle rate. A simplified 1D problem is formulated for an elementary analysis of the constellation deployment time. Numerical simulations are further performed for analytical analysis assessment and sensitivity analysis. Analytical analysis and numerical simulation results both agree that the constellation deployment time is proportional to the inverse square root of magnetic moment, the square root of desired phase angle and the square root of satellite mass. CubeSats ranging from 1 to 3 U (1-3 kg nanosatellites) are examined in order to investigate the feasibility of plasma drag constellation on nanosatellite systems. The feasibility analysis results show that plasma drag constellation is feasible on CubeSats, which open up the possibility of CubeSat constellation missions.

  9. GrayQb TM Single-Faced Version 2 (SF2) Hanford Plutonium Reclamation Facility (PRF) deployment report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Plummer, J. R.; Immel, D. M.; Serrato, M. G.

    2015-11-18

    The Savannah River National Laboratory (SRNL) in partnership with CH2M Plateau Remediation Company (CHPRC) deployed the GrayQb TM SF2 radiation imaging device at the Hanford Plutonium Reclamation Facility (PRF) to assist in the radiological characterization of the canyon. The deployment goal was to locate radiological contamination hot spots in the PRF canyon, where pencil tanks were removed and decontamination/debris removal operations are on-going, to support the CHPRC facility decontamination and decommissioning (D&D) effort. The PRF canyon D&D effort supports completion of the CHPRC Plutonium Finishing Plant Decommissioning Project. The GrayQb TM SF2 (Single Faced Version 2) is a non-destructive examinationmore » device developed by SRNL to generate radiation contour maps showing source locations and relative radiological levels present in the area under examination. The Hanford PRF GrayQbTM Deployment was sponsored by CH2M Plateau Remediation Company (CHPRC) through the DOE Richland Operations Office, Inter-Entity Work Order (IEWO), DOE-RL IEWO- M0SR900210.« less

  10. Development of an aircraft operation classification system for Louisiana's airports.

    DOT National Transportation Integrated Search

    2003-06-01

    In this project the development and deployment of systems measuring aircraft activity at airports is considered. This includes determining the type of aircraft and the type of aircraft activity. The type of aircraft is basic such as helicopter, singl...

  11. Lessons Learned in Deploying the World s Largest Scale Lustre File System

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Dillow, David A; Fuller, Douglas; Wang, Feiyi

    2010-01-01

    The Spider system at the Oak Ridge National Laboratory's Leadership Computing Facility (OLCF) is the world's largest scale Lustre parallel file system. Envisioned as a shared parallel file system capable of delivering both the bandwidth and capacity requirements of the OLCF's diverse computational environment, the project had a number of ambitious goals. To support the workloads of the OLCF's diverse computational platforms, the aggregate performance and storage capacity of Spider exceed that of our previously deployed systems by a factor of 6x - 240 GB/sec, and 17x - 10 Petabytes, respectively. Furthermore, Spider supports over 26,000 clients concurrently accessing themore » file system, which exceeds our previously deployed systems by nearly 4x. In addition to these scalability challenges, moving to a center-wide shared file system required dramatically improved resiliency and fault-tolerance mechanisms. This paper details our efforts in designing, deploying, and operating Spider. Through a phased approach of research and development, prototyping, deployment, and transition to operations, this work has resulted in a number of insights into large-scale parallel file system architectures, from both the design and the operational perspectives. We present in this paper our solutions to issues such as network congestion, performance baselining and evaluation, file system journaling overheads, and high availability in a system with tens of thousands of components. We also discuss areas of continued challenges, such as stressed metadata performance and the need for file system quality of service alongside with our efforts to address them. Finally, operational aspects of managing a system of this scale are discussed along with real-world data and observations.« less

  12. U.S. Strategic Nuclear Forces: Background, Developments, and Issues

    DTIC Science & Technology

    2016-03-10

    Strategic Offensive Reduction Treaty (known as the Moscow Treaty) between the United States and Russia, this number was to decline to no more than 2,200...the 2002 Moscow Treaty. According to the Bush Administration, operationally deployed warheads were those deployed on missiles and stored near bombers...given time. The warheads that could be carried on those submarines would not count against the Moscow Treaty limits because they would not be

  13. Project ADIOS: Aircraft Deployable Ice Observation System

    NASA Astrophysics Data System (ADS)

    Gudmundsson, G. H.

    2013-12-01

    Regions of the Antarctic that are of scientific interest are often too heavily crevassed to enable a plane to land, or permit safe access from a field camp. We have developed an alternative strategy for instrumenting these regions: a sensor that can be dropped from an overflying aircraft. Existing aircraft deployable sensors are not suitable for long term operations in areas where snow accumulates, as they are quickly buried. We have overcome this problem by shaping the sensor like an aerodynamic mast with fins and a small parachute. After being released from the aircraft, the sensor accelerates to 42m/s and stabilizes during a 10s descent. On impact with the snow surface the sensor package buries itself to a depth of 1m then uses the large surface area of the fins to stop it burying further. This leaves a 1.5m mast protruding high above the snow surface to ensure a long operating life. The high impact kinetic energy and robust fin braking mechanism ensure that the design works in both soft and hard snow. Over the past two years we have developed and tested our design with a series of aircraft and wind tunnel tests. Last season we used this deployment strategy to successfully install a network of 31 single band GPS sensors in regions where crevassing has previously prevented science operations: Pine Island Glacier, West Antarctica, and Scar Inlet, Antarctic Peninsula. This season we intend to expand on this network by deploying a further 25 single and dual band GPS sensors on Thwaites Glacier, West Antarctica.

  14. Effects of Deployment Investment on the Growth of the Biofuels Industry

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Vimmerstedt, Laura J.; Bush, Brian W.

    2013-12-01

    In support of the national goals for biofuel use in the United States, numerous technologies have been developed that convert biomass to biofuels. Some of these biomass to biofuel conversion technology pathways are operating at commercial scales, while others are in earlier stages of development. The advancement of a new pathway toward commercialization involves various types of progress, including yield improvements, process engineering, and financial performance. Actions of private investors and public programs can accelerate the demonstration and deployment of new conversion technology pathways. These investors (both private and public) will pursue a range of pilot, demonstration, and pioneer scalemore » biorefinery investments; the most cost-effective set of investments for advancing the maturity of any given biomass to biofuel conversion technology pathway is unknown. In some cases, whether or not the pathway itself will ultimately be technically and financially successful is also unknown. This report presents results from the Biomass Scenario Model -- a system dynamics model of the biomass to biofuels system -- that estimate effects of investments in biorefineries at different maturity levels and operational scales. The report discusses challenges in estimating effects of such investments and explores the interaction between this deployment investment and a volumetric production incentive. Model results show that investments in demonstration and deployment have a substantial positive effect on the development of the biofuels industry. Results also show that other conditions, such as supportive policies, have major impacts on the effectiveness of such investments.« less

  15. What Pre-Deployment and Early Post-Deployment Factors Predict Health Function after Combat Deployment?: A Prospective Longitudinal Study of Operation Enduring Freedom (OEF)/Operation Iraqi Freedom (OIF) Soldiers

    DTIC Science & Technology

    2013-04-30

    licenses/by/2.0), which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited. McAndrew et al...34), a trait related to hypnotic susceptibility. J Abnorm Psychol 1974, 83:268–277. 19. King DW, King LA, Vogt DS: Manual for the Deployment Risk and

  16. Application of Robotics in Decommissioning and Decontamination - 12536

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Banford, Anthony; Kuo, Jeffrey A.; Bowen, R.A.

    Decommissioning and dismantling of nuclear facilities is a significant challenge worldwide and one which is growing in size as more plants reach the end of their operational lives. The strategy chosen for individual projects varies from the hands-on approach with significant manual intervention using traditional demolition equipment at one extreme to bespoke highly engineered robotic solutions at the other. The degree of manual intervention is limited by the hazards and risks involved, and in some plants are unacceptable. Robotic remote engineering is often viewed as more expensive and less reliable than manual approaches, with significant lead times and capital expenditure.more » However, advances in robotics and automation in other industries offer potential benefits for future decommissioning activities, with the high probability of reducing worker exposure and other safety risks as well as reducing the schedule and costs required to complete these activities. Some nuclear decommissioning tasks and facility environments are so hazardous that they can only be accomplished by exclusive use of robotic and remote intervention. Less hazardous tasks can be accomplished by manual intervention and the use of PPE. However, PPE greatly decreases worker productivity and still exposes the worker to both risk and dose making remote operation preferable to achieve ALARP. Before remote operations can be widely accepted and deployed, there are some economic and technological challenges that must be addressed. These challenges will require long term investment commitments in order for technology to be: - Specifically developed for nuclear applications; - At a sufficient TRL for practical deployment; - Readily available as a COTS. Tremendous opportunities exist to reduce cost and schedule and improve safety in D and D activities through the use of robotic and/or tele-operated systems. - Increasing the level of remote intervention reduces the risk and dose to an operator. Better environmental information identifies hazards, which can be assessed, managed and mitigated. - Tele-autonomous control in a congested unstructured environment is more reliable compared to a human operator. Advances in Human Machine Interfaces contribute to reliability and task optimization. Use of standardized dexterous manipulators and COTS, including standardized communication protocols reduces project time scales. - The technologies identified, if developed to a sufficient TRL would all contribute to cost reductions. Additionally, optimizing a project's position on a Remote Intervention Scale, a Bespoke Equipment Scale and a Tele-autonomy Scale would provide cost reductions from the start of a project. Of the technologies identified, tele-autonomy is arguably the most significant, because this would provide a fundamental positive change for robotic control in the nuclear industry. The challenge for technology developers is to develop versatile robotic technology that can be economically deployed to a wide range of future D and D projects and industrial sectors. The challenge for facility owners and project managers is to partner with the developers to provide accurate systems requirements and an open and receptive environment for testing and deployment. To facilitate this development and deployment effort, the NNL and DOE have initiated discussions to explore a collaborative R and D program that would accelerate development and support the optimum utilization of resources. (authors)« less

  17. An efficient approach to the deployment of complex open source information systems

    PubMed Central

    Cong, Truong Van Chi; Groeneveld, Eildert

    2011-01-01

    Complex open source information systems are usually implemented as component-based software to inherit the available functionality of existing software packages developed by third parties. Consequently, the deployment of these systems not only requires the installation of operating system, application framework and the configuration of services but also needs to resolve the dependencies among components. The problem becomes more challenging when the application must be installed and used on different platforms such as Linux and Windows. To address this, an efficient approach using the virtualization technology is suggested and discussed in this paper. The approach has been applied in our project to deploy a web-based integrated information system in molecular genetics labs. It is a low-cost solution to benefit both software developers and end-users. PMID:22102770

  18. Space Acceleration Measurement System-II: Microgravity Instrumentation for the International Space Station Research Community

    NASA Technical Reports Server (NTRS)

    Sutliff, Thomas J.

    1999-01-01

    The International Space Station opens for business in the year 2000, and with the opening, science investigations will take advantage of the unique conditions it provides as an on-orbit laboratory for research. With initiation of scientific studies comes a need to understand the environment present during research. The Space Acceleration Measurement System-II provides researchers a consistent means to understand the vibratory conditions present during experimentation on the International Space Station. The Space Acceleration Measurement System-II, or SAMS-II, detects vibrations present while the space station is operating. SAMS-II on-orbit hardware is comprised of two basic building block elements: a centralized control unit and multiple Remote Triaxial Sensors deployed to measure the acceleration environment at the point of scientific research, generally within a research rack. Ground Operations Equipment is deployed to complete the command, control and data telemetry elements of the SAMS-II implementation. Initially, operations consist of user requirements development, measurement sensor deployment and use, and data recovery on the ground. Future system enhancements will provide additional user functionality and support more simultaneous users.

  19. Evaluation strategy for the I-95 CC electronic credentialing program

    DOT National Transportation Integrated Search

    1999-03-01

    The electronic credentialing field operational test will undertake the model deployment of electronic credentialing for commercial vehicles. The project will involve the development of state-specific electronic credentialing systems.

  20. Rendezvous, proximity operations and capture quality function deployment report

    NASA Technical Reports Server (NTRS)

    Lamkin, Stephen L. (Editor)

    1991-01-01

    Rendezvous, Proximity Operations, and Capture (RPOC) is a missions operations area which is extremely important to present and future space initiatives and must be well planned and coordinated. To support this, a study team was formed to identify a specific plan of action using the Quality Function Deployment (QFD) process. This team was composed of members from a wide spectrum of engineering and operations organizations which are involved in the RPOC technology area. The key to this study's success is an understanding of the needs of potential programmatic customers and the technology base available for system implementation. To this end, the study team conducted interviews with a variety of near term and future programmatic customers and technology development sponsors. The QFD activity led to a thorough understanding of the needs of these customers in the RPOC area, as well as the relative importance of these needs.

  1. The Kuwait Oil Fire Health Risk Assessment Biological Surveillance Initiative.

    PubMed

    Deeter, David P

    2011-07-01

    An important environmental concern during the first Gulf War (Operation Desert Storm) was assessing exposures and potential health effects in U.S. forces exposed to the Kuwait oil fires. With only 3 weeks for planning, a Biological Surveillance Initiative (BSI) was developed and implemented for a U.S. Army unit. The BSI included blood and urine collections, questionnaire administration, and other elements during the predeployment, deployment, and post-deployment phases. Many BSI objectives were accomplished. Difficulties encountered included planning failures, loss of data and information, and difficulty in interpreting laboratory results. In order for biological surveillance initiatives to provide useful information for future deployments where environmental exposures may be a concern, meaningful, detailed, and realistic planning and preparation must occur long before the deployment is initiated.

  2. Equipment compatibility and logistics assessment for containment foam deployment.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    McRoberts, Vincent M.; Martell, Mary-Alena; Jones, Joseph A.

    2005-09-01

    The deployment of the Joint Technical Operations Team (JTOT) is evolving toward a lean and mobile response team. As a result, opportunities to support more rapid mobilization are being investigated. This study investigates three specific opportunities including: (1) the potential of using standard firefighting equipment to support deployment of the aqueous foam concentrate (AFC-380); (2) determining the feasibility and needs for regional staging of equipment to reduce the inventory currently mobilized during a JTOT response; and (3) determining the feasibility and needs for development of the next generation AFC-380 to reduce the volume of foam concentrate required for a response.more » This study supports the need to ensure that requirements for alternative deployment schemes are understood and in place to support improved response activities.« less

  3. The Effects of a Dynamic Spectrum Access Overlay in LTE-Advanced Networks

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Juan D. Deaton; Ryan E. lrwin; Luiz A. DaSilva

    As early as 2014, wireless network operators spectral capacity will be overwhelmed by a data tsunami brought on by new devices and applications. To augment spectral capacity, operators could deploy a Dynamic Spectrum Access (DSA) overlay. In the light of the many planned Long Term Evolution (LTE) network deployments, the affects of a DSA overlay have not been fully considered into the existing LTE standards. Coalescing many different aspects of DSA, this paper develops the Spectrum Accountability (SA) framework. The SA framework defines specific network element functionality, protocol interfaces, and signaling flow diagrams for LTE to support service requests andmore » enforce rights of responsibilities of primary and secondary users, respectively. We also include a network simulation to quantify the benefits of using DSA channels to augment capacity. Based on our simulation we show that, network operators can benefit up to %40 increase in operating capacity when sharing DSA bands to augment spectral capacity. With our framework, this paper could serve as an guide in developing future LTE network standards that include DSA.« less

  4. The influence of deployment stress and life stress on Post-Traumatic Stress Disorder (PTSD) diagnosis among military personnel.

    PubMed

    Brownlow, Janeese A; Zitnik, Gerard A; McLean, Carmen P; Gehrman, Philip R

    2018-05-08

    There is increasing recognition that traumatic stress encountered throughout life, including those prior to military service, can put individuals at increased risk for developing Posttraumatic Stress Disorder (PTSD). The purpose of this study was to examine the association of both traumatic stress encountered during deployment, and traumatic stress over one's lifetime on probable PTSD diagnosis. Probable PTSD diagnosis was compared between military personnel deployed in Operation Iraqi Freedom/Operation Enduring Freedom (OIF/OEF; N = 21,499) and those who have recently enlisted (N = 55,814), using data obtained from the Army Study to Assess Risk and Resilience in Servicemembers (Army STARRS). Probable PTSD diagnosis was assessed using the PTSD Checklist. The effect of exposure to multiple types (i.e. diversity) of traumatic stress and the total quantity (i.e. cumulative) of traumatic stress on probable PTSD diagnosis was also compared. Military personnel who had been deployed experienced higher rates of PTSD symptoms than new soldiers. Diversity of lifetime traumatic stress predicted probable PTSD diagnosis in both groups, whereas cumulative lifetime traumatic stress only predicted probable PTSD for those who had been deployed. For deployed soldiers, having been exposed to various types of traumatic stress during deployment predicted probable PTSD diagnosis, but cumulative deployment-related traumatic stress did not. Similarly, the total quantity of traumatic stress (i.e. cumulative lifetime traumatic stress) did not predict probable PTSD diagnosis among new soldiers. Together, traumatic stress over one's lifetime is a predictor of probable PTSD for veterans, as much as traumatic stress encountered during war. Clinicians treating military personnel with PTSD should be aware of the impact of traumatic stress beyond what occurs during war. Copyright © 2018 Elsevier Ltd. All rights reserved.

  5. Reactor power system deployment and startup

    NASA Technical Reports Server (NTRS)

    Wetch, J. R.; Nelin, C. J.; Britt, E. J.; Klein, G.

    1985-01-01

    This paper addresses issues that should receive further examination in the near-term as concept selection for development of a U.S. space reactor power system is approached. The issues include: the economics, practicality and system reliability associated with transfer of nuclear spacecraft from low earth shuttle orbits to operational orbits, via chemical propulsion versus nuclear electric propulsion; possible astronaut supervised reactor and nuclear electric propulsion startup in low altitude Shuttle orbit; potential deployment methods for nuclear powered spacecraft from Shuttle; the general public safety of low altitude startup and nuclear safe and disposal orbits; the question of preferred reactor power level; and the question of frozen versus molten alkali metal coolant during launch and deployment. These issues must be considered now because they impact the SP-100 concept selection, power level selection, weight and size limits, use of deployable radiators, reliability requirements, and economics, as well as the degree of need for and the urgency of developing space reactor power systems.

  6. A System Engineering Study and Concept Development for a Humanitarian Aid and Disaster Relief Operations Management Platform

    DTIC Science & Technology

    2016-09-01

    and network. The computing and network hardware are identified and include routers, servers, firewalls, laptops , backup hard drives, smart phones...deployable hardware units will be necessary. This includes the use of ruggedized laptops and desktop computers , a projector system, communications system...ENGINEERING STUDY AND CONCEPT DEVELOPMENT FOR A HUMANITARIAN AID AND DISASTER RELIEF OPERATIONS MANAGEMENT PLATFORM by Julie A. Reed September

  7. Expanding the role of the nurse practitioner in the deployed setting.

    PubMed

    Dargis, Julie; Horne, Theresa; Tillman-Ortiz, Sophie; Scherr, Diane; Yackel, Edward E

    2006-08-01

    Today's military is experiencing rapid advances in technology and in manpower utilization. The Army Medical Department is redesigning the structure and function of deployable hospital systems as part of this effort. The transformation of deployable hospital systems requires that a critical analysis of manpower utilization be undertaken to optimize the employment of soldier-medics. The objective of this article was to describe the use of nurse practitioners as primary care providers during deployment. The lived experiences of five nurse practitioners deployed to Operation Iraqi Freedom are presented. Data gathered during the deployment and an analysis of the literature clearly support expanded and legitimized roles for these health care professionals in future conflicts and peacekeeping operations.

  8. Borrego springs microgrid demonstration project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None, None

    SDG&E has been developing and implementing the foundation for its Smart Grid platform for three decades – beginning with its innovations in automation and control technologies in the 1980s and 1990s, through its most recent Smart Meter deployment and re-engineering of operational processes enabled by new software applications in its OpEx 20/20 (Operational Excellence with a 20/20 Vision) program. SDG&E’s Smart Grid deployment efforts have been consistently acknowledged by industry observers. SDG&E’s commitment and progress has been recognized by IDC Energy Insights and Intelligent Utility Magazine as the nation’s “Most Intelligent Utility” for three consecutive years, winning this award eachmore » year since its inception. SDG&E also received the “Top Ten Utility” award for excellence in Smart Grid development from GreenTech Media.« less

  9. Shuttle remote manipulator system mission preparation and operations

    NASA Technical Reports Server (NTRS)

    Smith, Ernest E., Jr.

    1989-01-01

    The preflight planning, analysis, procedures development, and operations support for the Space Transportation System payload deployment and retrieval missions utilizing the Shuttle Remote Manipulator System are summarized. Analysis of the normal operational loads and failure induced loads and motion are factored into all procedures. Both the astronaut flight crews and the Mission Control Center flight control teams receive considerable training for standard and mission specific operations. The real time flight control team activities are described.

  10. Air and Space Operations Center-Weapon System Increment 10.2 (AOC-WS Inc 10.2)

    DTIC Science & Technology

    2016-03-01

    DAE - Defense Acquisition Executive DoD - Department of Defense DoDAF - DoD Architecture Framework FD - Full Deployment FDD - Full Deployment...the AOC 10.2 MAIS was approximately 11 months beyond the original schedule estimates for MS-C, July 31, 2015, and FDD , July 31, 2016. Accordingly...ADM effectively acknowledged selection of AOC-WS Inc 10.2 as the Preferred Alternative, thereby starting the 5-year development window to attain FDD

  11. Erectable/deployable concepts for large space system technology

    NASA Technical Reports Server (NTRS)

    Agan, W. E.

    1980-01-01

    Erectable/deployable space structure concepts particularly relating to the development of a science and applications space platform are presented. Design and operating features for an automatic coupler clevis joint, a side latching detent joint, and a module-to-module auto lock coupler are given. An analysis of the packaging characteristics of stacked subassembly, single fold, hybrid, and double fold concepts is given for various platform structure configurations. Payload carrier systems and assembly techniques are also discussed.

  12. Improving OBS operations in ultra-deep ocean during the Southern Mariana Trench expeditions

    NASA Astrophysics Data System (ADS)

    Zeng, X.; Lin, J.; Xu, M.; Zhou, Z.

    2017-12-01

    The Mariana Trench Research Initiative, led by the South China Sea Institute of Oceanology of the Chinese Academy of Sciences and through international collaboration, focuses on investigating the deep and shallow lithospheric structure, earthquake characteristics, extreme geological environments, and the controlling geodynamic mechanisms for the formation of Earth's deepest basins in the southern Mariana Trench. Two multidisciplinary research expeditions were executed during December 2016 and June 2017, respectively, on board R/V Shiyan 3. A main task of the Mariana Initiative is to conduct the Southern Mariana OBS Experiment (SMOE), the first OBS seismic experiment across the Challenger Deep. The SMOE expeditions include both active and passive source seismic experiments and employed a large number of broadband OBS instruments. Due to the deep water, rough weather, strong winds, and other unfavorable factors, it was challenging to deploy/recover the OBSs. During the two expeditions we developed and experimented with a number of ways to improve the success rate of OBS operations in the harsh ultra-deep ocean environment of the Southern Mariana Trench. All newly acquired OBSs underwent a series of uniquely designed deep-ocean tests to improve the instrument performance and maximize reliability during their deployment under the ultra-high pressure conditions. The OBS deployment and recovery followed a unified standard operation procedure and aided by an instrumental checklist, which were specifically designed and strictly enforced for operation during the expeditions. Furthermore, an advanced ship-based radio positioning system was developed to rapidly and accurately locate the OBS instruments when they reached the sea surface; the system proved its effectiveness even under extreme weather conditions. Through the development and application of the novel methods for operation in deep oceans, we overcame the rough sea and other unfavorable factors during the first two expeditions to the southern Mariana Trench and achieved a highly successful OBS operation program.

  13. Autonomous Sensorweb Operations for Integrated Space, In-Situ Monitoring of Volcanic Activity

    NASA Technical Reports Server (NTRS)

    Chien, Steve A.; Doubleday, Joshua; Kedar, Sharon; Davies, Ashley G.; Lahusen, Richard; Song, Wenzhan; Shirazi, Behrooz; Mandl, Daniel; Frye, Stuart

    2010-01-01

    We have deployed and demonstrated operations of an integrated space in-situ sensorweb for monitoring volcanic activity. This sensorweb includes a network of ground sensors deployed to the Mount Saint Helens volcano as well as the Earth Observing One spacecraft. The ground operations and space operations are interlinked in that ground-based intelligent event detections can cause the space segment to acquire additional data via observation requests and space-based data acquisitions (thermal imagery) can trigger reconfigurations of the ground network to allocate increased bandwidth to areas of the network best situated to observe the activity. The space-based operations are enabled by an automated mission planning and tasking capability which utilizes several Opengeospatial Consortium (OGC) Sensorweb Enablement (SWE) standards which enable acquiring data, alerts, and tasking using web services. The ground-based segment also supports similar protocols to enable seamless tasking and data delivery. The space-based segment also supports onboard development of data products (thermal summary images indicating areas of activity, quicklook context images, and thermal activity alerts). These onboard developed products have reduced data volume (compared to the complete images) which enables them to be transmitted to the ground more rapidly in engineering channels.

  14. Family support, family stress, and suicidal ideation in a combat-exposed sample of Operation Enduring Freedom/Operation Iraqi Freedom veterans.

    PubMed

    Gradus, Jaimie L; Smith, Brian N; Vogt, Dawne

    2015-01-01

    Deployment-related risk factors for suicidal ideation among Operation Enduring Freedom (OEF) and Operation Iraqi Freedom (OIF) veterans have received a great deal of attention. Studies show that mental health symptoms mediate the association between most deployment stressors and suicidal ideation; however, family-related factors during deployment are largely unexplored. We examined posttraumatic stress disorder (PTSD) and depression symptoms as mediators of the associations between deployment family support and stress and post-deployment suicidal ideation in combat-exposed OEF/OIF veterans. National cross-sectional mail survey. 1046 veterans responded to the survey. The sample for this study was 978 veterans who experienced combat. Regression-based path analyses were conducted. Family support and stress had direct associations with suicidal ideation. When PTSD and depression symptoms were examined as mediators of these associations, results revealed significant indirect paths through these symptoms. This study contributes to the literature on suicidal ideation risk factors among OEF/OIF veterans. Deployment family support and family stress are associated with suicidal ideation; however these associations occur primarily through mental health symptomatology, consistent with findings observed for other deployment factors. This research supports ongoing efforts to treat mental health symptomatology as a means of suicide prevention.

  15. Soldier-Warfighter Operationally Responsive Deployer for Space

    NASA Technical Reports Server (NTRS)

    Davis, Benny; Huebner, Larry; Kuhns, Richard

    2015-01-01

    The Soldier-Warfighter Operationally Responsive Deployer for Space (SWORDS) project was a joint project between the U.S. Army Space & Missile Defense Command (SMDC) and NASA. The effort, lead by SMDC, was intended to develop a three-stage liquid bipropellant (liquid oxygen/liquid methane), pressure-fed launch vehicle capable of inserting a payload of at least 25 kg to a 750-km circular orbit. The vehicle design was driven by low cost instead of high performance. SWORDS leveraged commercial industry standards to utilize standard hardware and technologies over customized unique aerospace designs. SWORDS identified broadly based global industries that have achieved adequate levels of quality control and reliability in their products and then designed around their expertise and business motivations.

  16. Connected vehicle pilot deployment program phase 1, concept of operations (ConOps) – Tampa (THEA).

    DOT National Transportation Integrated Search

    2016-02-01

    This document describes the Concept of Operations (ConOps) for the Tampa Hillsborough Expressway Authority (THEA) Connected Vehicle (CV) Pilot Deployment. This ConOps describes the current state of operations, establishes the reasons for change, and ...

  17. Robotics for Nuclear Material Handling at LANL:Capabilities and Needs

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Harden, Troy A; Lloyd, Jane A; Turner, Cameron J

    Nuclear material processing operations present numerous challenges for effective automation. Confined spaces, hazardous materials and processes, particulate contamination, radiation sources, and corrosive chemical operations are but a few of the significant hazards. However, automated systems represent a significant safety advance when deployed in place of manual tasks performed by human workers. The replacement of manual operations with automated systems has been desirable for nearly 40 years, yet only recently are automated systems becoming increasingly common for nuclear materials handling applications. This paper reviews several automation systems which are deployed or about to be deployed at Los Alamos National Laboratory formore » nuclear material handling operations. Highlighted are the current social and technological challenges faced in deploying automated systems into hazardous material handling environments and the opportunities for future innovations.« less

  18. On the Path to SunShot. Emerging Issues and Challenges in Integrating Solar with the Distribution System

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Palmintier, Bryan; Broderick, Robert; Mather, Barry

    2016-05-01

    This report analyzes distribution-integration challenges, solutions, and research needs in the context of distributed generation from PV (DGPV) deployment to date and the much higher levels of deployment expected with achievement of the U.S. Department of Energy's SunShot targets. Recent analyses have improved estimates of the DGPV hosting capacities of distribution systems. This report uses these results to statistically estimate the minimum DGPV hosting capacity for the contiguous United States using traditional inverters of approximately 170 GW without distribution system modifications. This hosting capacity roughly doubles if advanced inverters are used to manage local voltage and additional minor, low-cost changesmore » could further increase these levels substantially. Key to achieving these deployment levels at minimum cost is siting DGPV based on local hosting capacities, suggesting opportunities for regulatory, incentive, and interconnection innovation. Already, pre-computed hosting capacity is beginning to expedite DGPV interconnection requests and installations in select regions; however, realizing SunShot-scale deployment will require further improvements to DGPV interconnection processes, standards and codes, and compensation mechanisms so they embrace the contributions of DGPV to system-wide operations. SunShot-scale DGPV deployment will also require unprecedented coordination of the distribution and transmission systems. This includes harnessing DGPV's ability to relieve congestion and reduce system losses by generating closer to loads; minimizing system operating costs and reserve deployments through improved DGPV visibility; developing communication and control architectures that incorporate DGPV into system operations; providing frequency response, transient stability, and synthesized inertia with DGPV in the event of large-scale system disturbances; and potentially managing reactive power requirements due to large-scale deployment of advanced inverter functions. Finally, additional local and system-level value could be provided by integrating DGPV with energy storage and 'virtual storage,' which exploits improved management of electric vehicle charging, building energy systems, and other large loads. Together, continued innovation across this rich distribution landscape can enable the very-high deployment levels envisioned by SunShot.« less

  19. Experiences and career intentions of combat-deployed UK military personnel.

    PubMed

    Morris-Butler, R; Jones, N; Greenberg, N; Campion, B; Wessely, S

    2018-05-17

    Most studies of the psychological impact of military deployment focus on the negative and traumatic aspects. Less is known about the full range of deployment experiences nor how these may impact on career intentions. To examine subjective operational experiences and career intentions in deployed UK military personnel using data gathered toward the end of an operational deployment. Data were gathered during deployment in Iraq and Afghanistan. A self-report survey collected data on sociodemographic, operational and military factors. Respondents provided their strength of agreement or disagreement with six potentially positive deployment experiences and their endorsement or rejection of six possible career intentions. Two mental health measures assessed symptoms of common mental disorder and post-traumatic stress disorder. Responses were 681 in Iran 2009 (100% response rate); 1421 in Afghanistan in 2010 (100%), 1362 in 2011 (96%) and 860 in 2015 (91%). Five of the potentially positive outcomes were endorsed by >50% of the sample: confidence about remaining healthy after returning home, pride in accomplishments, increased confidence in abilities, improved unit cohesion and experiencing a positive life effect. Ninety per cent of respondents planned to continue in service after returning home. Fewer positive deployment experiences, poorer mental health, lesser unit cohesion and more negative impressions of leadership were significantly associated with intention to leave service. Contrary to the popular belief that UK military personnel deployed to Iraq or Afghanistan experience negative outcomes, this paper shows that deployment can be a positive experience for a substantial majority of deployed personnel.

  20. Resilient Grid Operational Strategies

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Pasqualini, Donatella

    Extreme weather-related disturbances, such as hurricanes, are a leading cause of grid outages historically. Although physical asset hardening is perhaps the most common way to mitigate the impacts of severe weather, operational strategies may be deployed to limit the extent of societal and economic losses associated with weather-related physical damage.1 The purpose of this study is to examine bulk power-system operational strategies that can be deployed to mitigate the impact of severe weather disruptions caused by hurricanes, thereby increasing grid resilience to maintain continuity of critical infrastructure during extreme weather. To estimate the impacts of resilient grid operational strategies, Losmore » Alamos National Laboratory (LANL) developed a framework for hurricane probabilistic risk analysis (PRA). The probabilistic nature of this framework allows us to estimate the probability distribution of likely impacts, as opposed to the worst-case impacts. The project scope does not include strategies that are not operations related, such as transmission system hardening (e.g., undergrounding, transmission tower reinforcement and substation flood protection) and solutions in the distribution network.« less

  1. The development and testing of the Lens Antenna Deployment Demonstration (LADD) test article

    NASA Technical Reports Server (NTRS)

    Pugh, Mark L.; Denton, Robert J., Jr.; Strange, Timothy J.

    1993-01-01

    The USAF Rome Laboratory and NASA Marshall Space Flight Center, through contract to Grumman Corporation, have developed a space-qualifiable test article for the Strategic Defense Initiative Organization to demonstrate the critical structural and mechanical elements of single-axis roll-out membrane deployment for Space Based Radar (SBR) applications. The Lens Antenna Deployment Demonstration (LADD) test article, originally designed as a shuttle-attached flight experiment, is a large precision space structure which is representative of operational designs for space-fed lens antennas. Although the flight experiment was cancelled due to funding constraints and major revisions in the Strategic Defense System (SDS) architecture, development of this test article was completed in June 1989. To take full advantage of the existence of this unique structure, a series of ground tests are proposed which include static, dynamic, and thermal measurements in a simulated space environment. An equally important objective of these tests is the verification of the analytical tools used to design and develop large precision space structures.

  2. Advanced consequence management program: challenges and recent real-world implementations

    NASA Astrophysics Data System (ADS)

    Graser, Tom; Barber, K. S.; Williams, Bob; Saghir, Feras; Henry, Kurt A.

    2002-08-01

    The Enhanced Consequence Management, Planning and Support System (ENCOMPASS) was developed under DARPA's Advanced Consequence Management program to assist decision-makers operating in crisis situations such as terrorist attacks using conventional and unconventional weapons and natural disasters. ENCOMPASS provides the tools for first responders, incident commanders, and officials at all levels to share vital information and consequently, plan and execute a coordinated response to incidents of varying complexity and size. ENCOMPASS offers custom configuration of components with capabilities ranging from map-based situation assessment, situation-based response checklists, casualty tracking, and epidemiological surveillance. Developing and deploying such a comprehensive system posed significant challenges for DARPA program management, due to an inherently complex domain, a broad spectrum of customer sites and skill sets, an often inhospitable runtime environment, demanding development-to-deployment transition requirements, and a technically diverse and geographically distributed development team. This paper introduces ENCOMPASS and explores these challenges, followed by an outline of selected ENCOMPASS deployments, demonstrating how ENCOMPASS can enhance consequence management in a variety real world contexts.

  3. 511 travel information service development & documentation.

    DOT National Transportation Integrated Search

    2011-10-01

    "511 New York was deployed as a free, comprehensive travel information system geared to meet the multimodal needs of commuters, long-distance and local travelers, tourists and commercial-vehicle operators. The up-to-the-minute, comprehensive transpor...

  4. Connected vehicle pilot deployment program phase 1, concept of operations (ConOps) - New York City.

    DOT National Transportation Integrated Search

    2016-04-08

    This document describes the Concept of Operations (ConOps) for the New York City Department of Transportation (NYC) Connected Vehicle Pilot Deployment (CVPD) Project. This ConOps describes the current state of operations, establishes the reasons for ...

  5. Experiences with a Decade of Wireless Sensor Networks in Mountain Cryosphere Research

    NASA Astrophysics Data System (ADS)

    Beutel, Jan

    2017-04-01

    Research in geoscience depends on high-quality measurements over long periods of time in order to understand processes and to create and validate models. The promise of wireless sensor networks to monitor autonomously at unprecedented spatial and temporal scale motivated the use of this novel technology for studying mountain permafrost in the mid 2000s. Starting from a first experimental deployment to investigate the thermal properties of steep bedrock permafrost in 2006 on the Jungfraujoch, Switzerland at 3500 m asl using prototype wireless sensors the PermaSense project has evolved into a multi-site and multi-discipline initiative. We develop, deploy and operate wireless sensing systems customized for long-term autonomous operation in high-mountain environments. Around this central element, we develop concepts, methods and tools to investigate and to quantify the connection between climate, cryosphere (permafrost, glaciers, snow) and geomorphodynamics. In this presentation, we describe the concepts and system architecture used both for the wireless sensor network as well as for data management and processing. Furthermore, we will discuss the experience gained in over a decade of planning, installing and operating large deployments on field sites spread across a large part of the Swiss and French Alps and applications ranging from academic, experimental research campaigns, long-term monitoring and natural hazard warning in collaboration with government authorities and local industry partners. Reference http://www.permasense.ch Online Open Data Access http://data.permasense.ch

  6. The Partition Intervalometer: A Programmable Underwater Timer for Marking Accumulated Sediment Profiles Collected in Anderson Sediment Traps: Development, Operation, Testing Procedures, and Field Results

    USGS Publications Warehouse

    Rendigs, Richard R.; Anderson, Roger Y.; Xu, Jingping; Davis, Raymond E.; Bergeron, Emile M.

    2009-01-01

    This manual illustrates the development of a programmable instrument designed to deploy a series of wafer-shaped discs (partitions) into the collection tube of a sediment trap in various aquatic environments. These hydrodynamically shaped discs are deployed at discrete time intervals from the Intervalometer and provide markers that delineate time intervals within the sediments that accumulate in the collection tube. The timer and mechanical system are lodged in an air-filled, water-tight pressure housing that is vertically hung within the confines of a cone-shaped sediment trap. The instrumentation has been operationally pressure tested to an equivalent water depth of approximately 1 km. Flaws discovered during extensive laboratory and pressure testing resulted in the implementation of several mechanical modifications (such as a redesign of the rotor and the discs) that improved the operation of the rotor assembly as well as the release of discs through the end cap. These results also identified a preferred azimuth placement of the rotor disc relative to the drop hole of the end cap. In the initial field trial, five sediment traps and coupled Intervalometers were attached to moored arrays and deployed at two sites off the coast of Southern California for approximately 8 months. Each of the instruments released 18 discs at the programmed 10 day intervals, except one unit, which experienced a malfunction after approximately 4 months. Most of the discs oriented in a near-horizontal position upon the surface of the sediment in the collection tubes. Sampling of the sediments for geochemical analyses was improved by these clearly defined markers, which indicated the changes in the flux and nature of sediments accumulated during the deployment period of each sediment trap.

  7. Developing a global aeronautical satellite system

    NASA Technical Reports Server (NTRS)

    Dement, Donald K.

    1988-01-01

    Arinc, an airline industry-owned and operated company in the United States, has taken steps toward establishing a global aeronautical satellite communications system. Plans call for initiation of a thin-route data operation in 1989, upgrading to establish voice communications via shared spot-beam transponders carried on other satellites, and deploying a worldwide network using dedicated satellites by 1994.

  8. 50 Years Air Force Issues Book 1997

    DTIC Science & Technology

    1997-01-01

    12 Space Launches and Operations ............................................................................ 13 Non ...In the near-term, we are developing lethal and 1997. non -lethal AEFs for deployment to areas We are also undertaking a variety of measures outside the...providing missile early warning data to NATO and Japan, and we have extended this service to other nations as well. Non -combatant Evacuation Operations (NEO

  9. United States Air Force F-35A Operational Basing Environmental Impact Statement. Volume 1

    DTIC Science & Technology

    2013-09-01

    Evaluation (FDE) program and Weapons School (WS) beddown, the F-22 designator was used. Subsequent testing , development, and deployment resulted in...Initial F-35A Operational Basing EIS Final, September 2013 contract to develop the JSF ( designated the F-35 Lightning II). Since then, testing of F...of the aircraft even with system failures. Throughout the design and testing process, safety initiatives took previous best practices for single

  10. The 25 kW power module evolution study. Part 3: Conceptual designs for power module evolution. Volume 2: Program plans

    NASA Technical Reports Server (NTRS)

    1979-01-01

    A plan is presented for the evolutionary development and deployment of the power module system with performance capabilities required to support the 1983 to 1990 user requirements. Aspects summarized include program functional, operational, and hardware elements; program work breakdown and specification items; development plans and schedules for developmental and technology milestones; test concepts and timeliness; and ground and orbit operations concepts.

  11. Deploying the ODIS robot in Iraq and Afghanistan

    NASA Astrophysics Data System (ADS)

    Smuda, Bill; Schoenherr, Edward; Andrusz, Henry; Gerhart, Grant

    2005-05-01

    The wars in Iraq and Afghanistan have shown the importance of robotic technology as a force multiplier and a tool for moving soldiers out of harms way. Situations on the ground make soldiers performing checkpoint operations easy targets for snipers and suicide bombers. Robotics technology reduces risk to soldiers and other personnel at checkpoints. Early user involvement in innovative and aggressive development and acquisition strategies are the key to moving robotic and associated technology into the hands of the user. This paper updates activity associated with rapid development of the Omni-Directional Inspection System (ODIS) robot for under vehicle inspection and reports on our field experience with robotics in Iraq and Afghanistan. In February of 2004, two TARDEC Engineers departed for a mission to Iraq and Afghanistan with ten ODIS Robots. Six robots were deployed in the Green Zone in Baghdad. Two Robots were deployed at Kandahar Army Airfield and two were deployed at Bagram Army Airfield in Afghanistan. The TARDEC Engineers who performed this mission trained the soldiers and provided initial on site support. They also trained Exponent employees assigned to the Rapid Equipping Force in ODIS repair. We will discuss our initial deployment, lessons learned and future plans.

  12. Supporting the joint warfighter by development, training, and fielding of man-portable UGVs

    NASA Astrophysics Data System (ADS)

    Ebert, Kenneth A.; Stratton, Benjamin V.

    2005-05-01

    The Robotic Systems Pool (RSP), sponsored by the Joint Robotics Program (JRP), is an inventory of small robotic systems, payloads, and components intended to expedite the development and integration of technology into effective, supportable, fielded robotic assets. The RSP loans systems to multiple users including the military, first-responders, research organizations, and academia. These users provide feedback in their specific domain, accelerating research and development improvements of robotic systems, which in turn allow the joint warfighter to benefit from such changes more quickly than from traditional acquisition cycles. Over the past year, RSP assets have been used extensively for pre-deployment operator and field training of joint Explosive Ordnance Disposal (EOD) teams, and for the training of Navy Reservist repair technicians. These Reservists are part of the Robotic Systems Combat Support Platoon (RSCSP), attached to Space and Naval Warfare Systems Center, San Diego. The RSCSP maintains and repairs RSP assets and provides deployable technical support for users of robotic systems. Currently, a small team from the RSCSP is deployed at Camp Victory repairing and maintaining man-portable unmanned ground vehicles (UGVs) used by joint EOD teams in Operation Iraqi Freedom. The focus of this paper is to elaborate on the RSP and RSCSP and their role as invaluable resources for spiral development in the robotics community by gaining first-hand technical feedback from the warfighter and other users.

  13. JPL self pulsed laser surface measurement system development. [large space deployed antenna structures

    NASA Technical Reports Server (NTRS)

    Berdahl, M.

    1980-01-01

    The use of a self pulsed laser system for accurately describing the surface shape of large space deployed antenna structures was evaluated. Tests with a breadboard system verified functional operation with short time resolution on the order of .2 mm, nonambiguous ranging, and a maximum range capability on the order of 150 m. The projected capability of the system is resolution of less than .1 mm over a reasonable time period and a range extension to over 300 m.

  14. Development of a ROV Deployed Video Analysis Tool for Rapid Measurement of Submerged Oil/Gas Leaks

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Savas, Omer

    Expanded deep sea drilling around the globe makes it necessary to have readily available tools to quickly and accurately measure discharge rates from accidental submerged oil/gas leak jets for the first responders to deploy adequate resources for containment. We have developed and tested a field deployable video analysis software package which is able to provide in the field sufficiently accurate flow rate estimates for initial responders in accidental oil discharges in submarine operations. The essence of our approach is based on tracking coherent features at the interface in the near field of immiscible turbulent jets. The software package, UCB_Plume, ismore » ready to be used by the first responders for field implementation. We have tested the tool on submerged water and oil jets which are made visible using fluorescent dyes. We have been able to estimate the discharge rate within 20% accuracy. A high end WINDOWS laptop computer is suggested as the operating platform and a USB connected high speed, high resolution monochrome camera as the imaging device are sufficient for acquiring flow images under continuous unidirectional illumination and running the software in the field. Results are obtained over a matter of minutes.« less

  15. Methodology for fleet deployment decisions. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Stremel, J.; Matousek, M.

    1995-01-01

    In today`s more competitive energy market, selecting investment and operating plans for a generating system, specific plants, and major plant components is becoming increasingly critical and complex. As utilities consider off-system sales, the key factor for fleet deployment decisions is no longer simply minimizing revenue requirements. Rather, system-level value dominates. This is a measure that can be difficult to determine in the context of traditional decision making methods. Selecting the best fleet deployment option requires the ability to account for multiple sources of value under uncertain conditions for multiple utility stakeholders. The object of this paper was to develope andmore » test an approach for assessing the system-wide value of alternative fleet deployment decisions. This was done, and the approach was tested at Consolidated Edison and at Central Illinois Public Service Company.« less

  16. Satellite Sensornet Gateway Technology Infusion Through Rapid Deployments for Environmental Sensing

    NASA Astrophysics Data System (ADS)

    Benzel, T.; Silva, F.; Deschon, A.; Ye, W.; Cho, Y.

    2008-12-01

    The Satellite Sensornet Gateway (SSG) is an ongoing ESTO Advanced Information Systems Technology project, at the University of Southern California. The major goal of SSG is to develop a turnkey solution for building environmental observation systems based on sensor networks. Our system has been developed through an iterative series of deployment-driven design, build, test, and revise which maximizes technology infusion to the earth scientist. We have designed a robust and flexible sensor network called Sensor Processing and Acquisition Network (SPAN). Our SPAN architecture emphasizes a modular and extensible design, such that core building blocks can be reused to develop different scientific observation systems. To support rapid deployment at remote locations, we employ satellite communications as the backhaul to relay in-situ sensor data to a central database. To easily support various science applications, we have developed a unified sensor integration framework that allows streamlined integration of different sensors to the system. Our system supports heterogeneous sets of sensors, from industry-grade products to research- specific prototypes. To ensure robust operation in harsh environments, we have developed mechanisms to monitor system status and recover from potential failures along with additional remote configuration and QA/QC functions. Here we briefly describe the deployments, the key science missions of the deployments and the role that the SSG technology played in each mission. We first deployed our SSG technology at the James Reserve in February 2007. In a joint deployment with the NEON project, SDSC, and UC Riverside, we set up a meteorological station, using a diverse set of sensors, with the objective of validating our basic technology components in the field. This system is still operational and streaming live sensor data. At Stunt Ranch, a UC Reserve near Malibu, CA, we partnered with UCLA biologist Phillip Rundel in order to study the drought impact on deep and shallow rooted plants. Our system was deployed in December 2007 and monitors sap flow on various plant species, while using a satellite link for real-time data access. In April 2008, in a joint deployment with UCLA, UC Merced, and GLEON, our SSG technology was used to study the impact of agricultural run off in a series of salt lakes near Bahia Blanca, Argentina. Our system collected meteorological data that were combined with water quality measurements taken from boats and buoys. Our SSG technology was used at the PASI workshop in June 2008 at the La Selva Biological Research Station in Costa Rica. As part of a two-week curriculum, students from throughout the americas used our system to collect measurements in the rain forest and later analyzed the data. La Selva plans to install several SSG nodes throughout the reserve and make mobile nodes available for visiting researchers to use in their research. We are currently planning a deployment with environmental engineer Tom Harmon from UC Merced to build an autonomous water quality flow path and reactive transport observation system near Merced, CA. SSG technology will be deployed to monitor soil, groundwater, and surface water parameters. In China's Guizhou Province, we are collaborating with researcher Sarah Rothenberg, who is studying mercury cycling in rice paddies. Our SSG system will collect soil parameters such as pH and ORP, in addition to environmental measurements such as PAR, and UV. This presentation will describe the SSG project, the SPAN prototype and our experience with technology infusion from the deployments. class="ab'>

  17. Deployment of field hospitals to disaster regions: Insights from ten medical relief operations spanning three decades.

    PubMed

    Naor, Michael; Heyman, Samuel N; Bader, Tarif; Merin, Ofer

    2017-01-01

    The Israeli Defense Force (IDF) Medical Corps developed a model of airborne field hospital. This model was structured to deal with disaster settings, requiring self-sufficiency, innovation and flexible operative mode in the setup of large margins of uncertainty regarding the disaster environment. The current study is aimed to critically analyze the experience, gathered in ten such missions worldwide. Interviews with physicians who actively participated in the missions from 1988 until 2015 as chief medical officers combined with literature review of principal medical and auxiliary publications in order to assess and integrate information about the assembly of these missions. A body of knowledge was accumulated over the years by the IDF Medical Corps from deploying numerous relief missions to both natural (earthquake, typhoon, and tsunami), and man-made disasters, occurring in nine countries (Armenia, Rwanda, Kosovo, Turkey, India, Haiti, Japan, Philippines, and Nepal). This study shows an evolutionary pattern with improvements implemented from one mission to the other, with special adaptations (creativity and improvisation) to accommodate logistics barriers. The principals and operative function for deploying medical relief system, proposed over 20 years ago, were challenged and validated in the subsequent missions of IDF outlined in the current study. These principals, with the advantage of the military infrastructure and the expertise of drafted civilian medical professionals enable the rapid assembly and allocation of highly competent medical facilities in disaster settings. This structure model is to large extent self-sufficient with a substantial operative flexibility that permits early deployment upon request while the disaster assessment and definition of needs are preliminary.

  18. Burn hazards of the deployed environment in wartime: epidemiology of noncombat burns from ongoing United States military operations.

    PubMed

    Kauvar, David S; Wade, Charles E; Baer, David G

    2009-10-01

    Service in the deployed military environment carries risks for accidental (noncombat-related) burns. Examining these risks can assist in the development of military burn prevention measures. This study endeavored to examine noncombat burn epidemiology in the context of similar civilian data. We performed a retrospective cohort study of consecutive casualties evacuated from operational military theaters in Iraq and Afghanistan to the sole tertiary military burn center in the US. Military data were compared with database samples of the US population from the American Burn Association and the Centers for Disease Control and Prevention. The main causes of the 180 noncombat burns seen from March 2003 to June 2008 were waste burning, fuel mishaps, and unintentional ordinance detonations. Overall prevalence of noncombat burns was 19.5 burns/100,000 person-years lived. If causes specific to military operations are removed, military prevalence was 13.0/100,000. More than one-third of noncombat burns occurred in the first year of the study; a period of stability followed. A similar US population had an accidental burn prevalence of 7.1/100,000 from 2003 to 2007. Burn size, presence of inhalation injury, and burn center mortality were not different from those in a similar civilian cohort. Deployed service members have a greater risk of unintentional burns than a similar civilian cohort does. This is in part because of the specific dangers of military activities. More attention to deployed military burn prevention is needed, especially early in combat support operations.

  19. Gastrointestinal Infections in Deployed Forces in the Middle East Theater: An Historical 60 Year Perspective

    PubMed Central

    Riddle, Mark S.; Savarino, Stephen J.; Sanders, John W.

    2015-01-01

    Infectious diarrhea has been among the most common maladies of military deployments throughout time. The U.S. military experienced a significant burden from this disease in the middle eastern and north African campaigns of World War II (WWII). This article compares patterns of disease experienced in WWII with the recent military deployments to the same region for Operation Iraqi Freedom and Operation Enduring Freedom (OIF/OEF). Remarkable similarities in the prevalence and risk factors were noted, which belie the assumed improvements in prevention against these infections. In both campaigns, peaks of diarrhea occurred shortly after arrival of new personnel, which were seasonally associated and were linked to initial lapses in field sanitation and hygiene. It is important to reassess current strategies, especially, in light of emerging evidence of the chronic sequelae of these common infections to include a reemphasis on or reexamination of vaccine development, rapid field diagnostics, treatment algorithms, and antimicrobial prophylaxis. PMID:26350450

  20. The Role of Structural Models in the Solar Sail Flight Validation Process

    NASA Technical Reports Server (NTRS)

    Johnston, John D.

    2004-01-01

    NASA is currently soliciting proposals via the New Millennium Program ST-9 opportunity for a potential Solar Sail Flight Validation (SSFV) experiment to develop and operate in space a deployable solar sail that can be steered and provides measurable acceleration. The approach planned for this experiment is to test and validate models and processes for solar sail design, fabrication, deployment, and flight. These models and processes would then be used to design, fabricate, and operate scaleable solar sails for future space science missions. There are six validation objectives planned for the ST9 SSFV experiment: 1) Validate solar sail design tools and fabrication methods; 2) Validate controlled deployment; 3) Validate in space structural characteristics (focus of poster); 4) Validate solar sail attitude control; 5) Validate solar sail thrust performance; 6) Characterize the sail's electromagnetic interaction with the space environment. This poster presents a top-level assessment of the role of structural models in the validation process for in-space structural characteristics.

  1. The 'Room within a Room' Concept for Monitored Warhead Dismantlement

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Tanner, Jennifer E.; Benz, Jacob M.; White, Helen

    2014-12-01

    Over the past 10 years, US and UK experts have engaged in a technical collaboration with the aim of improving scientific and technological abilities in support of potential future nuclear arms control and non-proliferation agreements. In 2011 a monitored dismantlement exercise provided an opportunity to develop and test potential monitoring technologies and approaches. The exercise followed a simulated nuclear object through a dismantlement process and looked to explore, with a level of realism, issues surrounding device and material monitoring, chain of custody, authentication and certification of equipment, data management and managed access. This paper focuses on the development and deploymentmore » of the ‘room-within-a-room’ system, which was designed to maintain chain of custody during disassembly operations. A key challenge for any verification regime operating within a nuclear weapon complex is to provide the monitoring party with the opportunity to gather sufficient evidence, whilst protecting sensitive or proliferative information held by the host. The requirement to address both monitoring and host party concerns led to a dual function design which: • Created a controlled boundary around the disassembly process area which could provide evidence of unauthorised diversion activities. • Shielded sensitive disassembly operations from monitoring party observation. The deployed room-within-a-room was an integrated system which combined a number of chain of custody technologies (i.e. cameras, tamper indicating panels and enclosures, seals, unique identifiers and radiation portals) and supporting deployment procedures. This paper discusses the bounding aims and constraints identified by the monitoring and host parties with respect to the disassembly phase, the design of the room-within-a-room system, lessons learned during deployment, conclusions and potential areas of future work. Overall it was agreed that the room-within-a-room approach was effective but the individual technologies used to create the system deployed during this exercise required further development.« less

  2. Six Information Technology Services Contracts for the Defense Intelligence Community

    DTIC Science & Technology

    2000-04-24

    This category covers Defense Intelligence Community organizations whose mission is to provide for the planning, development, deployment, operation ... management , and oversight of global information networks and infrastructure supporting intelligence producers. • Information Systems. This category

  3. Studies of potential intelligent transportation systems benefits using traffic simulation modeling

    DOT National Transportation Integrated Search

    1996-06-01

    This report documents five studies performed by Mitretek Systems, Inc. to analyze potential : benefits of Intelligent Transportation Systems (ITS) deployment, in support of the ITS : Architecture Development Program. The studies explore the operation...

  4. Accounting for Induced Travel in Evaluation of Urban Highway Expansion

    DOT National Transportation Integrated Search

    2013-02-01

    The US DOT sponsored Dynamic Mobility Applications (DMA) program seeks to identify, develop, and deploy applications that leverage the full potential of connected vehicles, travelers and infrastructure to enhance current operational practices and tra...

  5. Engineering risk reduction in satellite programs

    NASA Technical Reports Server (NTRS)

    Dean, E. S., Jr.

    1979-01-01

    Methods developed in planning and executing system safety engineering programs for Lockheed satellite integration contracts are presented. These procedures establish the applicable safety design criteria, document design compliance and assess the residual risks where non-compliant design is proposed, and provide for hazard analysis of system level test, handling and launch preparations. Operations hazard analysis identifies product protection and product liability hazards prior to the preparation of operational procedures and provides safety requirements for inclusion in them. The method developed for documenting all residual hazards for the attention of program management assures an acceptable minimum level of risk prior to program deployment. The results are significant for persons responsible for managing or engineering the deployment and production of complex high cost equipment under current product liability law and cost/time constraints, have a responsibility to minimize the possibility of an accident, and should have documentation to provide a defense in a product liability suit.

  6. Airship Industry Study

    NASA Technical Reports Server (NTRS)

    Hochstetler, Ron; Chachad, Girish; Melton, John

    2016-01-01

    In April, 2015 NASA Ames Research Center conducted a study of the airship industry. The project called for a report that would describe airship concepts proposed or projects initiated, airship performance or capability targets, and the missions these activities were addressing. It would detail the principal technical features of these airships; the proposed value/advantages of the features, notional concepts of operation, and challenges associated with the vehicles. Also investigated would be the current status and near-term prospects of these airship development activities, whether they are active or, if curtailed the circumstances and possible reasons for that conclusion including technical, business, or other mitigating factors. For the most active programs an assessment would be conducted to identify the resources or activities required for airships to advance to series construction and operational deployment. The study would also identify impediments to these developments and deployments, with recommendations provided to address existing issues in the airship industry today.

  7. Supporting Collaborative Model and Data Service Development and Deployment with DevOps

    NASA Astrophysics Data System (ADS)

    David, O.

    2016-12-01

    Adopting DevOps practices for model service development and deployment enables a community to engage in service-oriented modeling and data management. The Cloud Services Integration Platform (CSIP) developed the last 5 years at Colorado State University provides for collaborative integration of environmental models into scalable model and data services as a micro-services platform with API and deployment infrastructure. Originally developed to support USDA natural resource applications, it proved suitable for a wider range of applications in the environmental modeling domain. While extending its scope and visibility it became apparent community integration and adequate work flow support through the full model development and application cycle drove successful outcomes.DevOps provide best practices, tools, and organizational structures to optimize the transition from model service development to deployment by minimizing the (i) operational burden and (ii) turnaround time for modelers. We have developed and implemented a methodology to fully automate a suite of applications for application lifecycle management, version control, continuous integration, container management, and container scaling to enable model and data service developers in various institutions to collaboratively build, run, deploy, test, and scale services within minutes.To date more than 160 model and data services are available for applications in hydrology (PRMS, Hydrotools, CFA, ESP), water and wind erosion prediction (WEPP, WEPS, RUSLE2), soil quality trends (SCI, STIR), water quality analysis (SWAT-CP, WQM, CFA, AgES-W), stream degradation assessment (SWAT-DEG), hydraulics (cross-section), and grazing management (GRAS). In addition, supporting data services include soil (SSURGO), ecological site (ESIS), climate (CLIGEN, WINDGEN), land management and crop rotations (LMOD), and pesticides (WQM), developed using this workflow automation and decentralized governance.

  8. Treatment seeking for posttraumatic stress in Israel Defense Forces veterans deployed in the Second Lebanon War (2006) and "Operation Cast Lead" in the Gaza Strip (2009): a comparative study.

    PubMed

    Levi, Ofir; Lubin, Gadi

    2018-05-01

    The goal of the study was to determine the long-term prevalence of combat-related treatment seeking and posttraumatic stress disorder (PTSD) in Israel's veterans deployed to the Second Lebanon War (2006) and "Operation Cast Lead" in the Gaza Strip (2009). The prevalence of treatment seeking and DSM-IV-TR diagnoses among Israel Defense Force (IDF) veterans was assessed using seven and five year's surveillance and records. The whereabouts and combat exposure of veterans during the war was determined based on the IDF's Operations Directorate records. Overall prevalence of treatment seeking was 1.32% and 0.38% in the Second Lebanon War and "Operation Cast Lead", respectively. The prevalence of treatment-seeking veterans from the Second Lebanon War and in "Operation Cast Lead" was significantly higher in soldiers deployed to high combat-exposure zones (2.19% and 3.1%, respectively), relative to low combat-exposure zones (0.24% and 0.06%, respectively), and relative to soldiers deployed elsewhere (0.26% and 0.02%, respectively). PTSD prevalence was similar among treatment-seeking veterans deployed in high combat-exposure zones in both combats. There is a gap of anywhere between 3% and 11% between treatment seeking by IDF veterans following war deployment and the actual prevalence of PTSD in this soldier population.

  9. Site Selection and Deployment Scenarios for Servicing of Deep-Space Observatories

    NASA Technical Reports Server (NTRS)

    Willenberg, Harvey J.; Fruhwirth, Michael A.; Potter, Seth D.; Leete, Stephen J.; Moe, Rud V.

    2001-01-01

    The deep-space environment and relative transportation accessibility of the Weak Stability Boundary (WSB) region connecting the Earth-Moon and Sun-Earth libration points makes the Sun-Earth L2 an attractive operating location for future observatories. A summary is presented of key characteristics of future observatories designed to operate in this region. The ability to service observatories that operate within the region around the Lagrange points may greatly enhance their reliability, lifetime, and scientific return. The range of servicing missions might begin with initial deployment, assembly, test, and checkout. Post-assembly servicing missions might also include maintenance and repair, critical fluids resupply, and instrument upgrades. We define the range of servicing missions that can be performed with extravehicular activity, with teleoperated robots, and with autonomous robots. We then describe deployment scenarios that affect payload design. A trade study is summarized of the benefits and risks of alternative servicing sites, including at the International Space Station, at other low-Earth-orbit locations, at the Earth-Moon L1 location, and on-site at the Sun-Earth L2 location. Required technology trades and development issues for observatory servicing at each site, and with each level of autonomy, are summarized.

  10. The NICMOS Cooling SYSTEM-5 Years of Successful On-Orbit Operation

    NASA Astrophysics Data System (ADS)

    Swift, W. L.; Dolan, F. X.; Zagarola, M. V.

    2008-03-01

    The NICMOS Cooling System consists of a closed-loop turbo-Brayton cryocooler coupled with a cryogenic circulator that provides refrigeration to the Near Infrared Camera and Multi-Object Spectrometer (NICMOS) on the Hubble Space Telescope (HST). The cryocooler heat is rejected to space through a capillary pumped loop connected to radiators mounted on the side of the telescope. The system was deployed and integrated with NICMOS by astronauts during STS-109 (Space Shuttle Columbia) in March 2002. It has operated nearly continuously without performance degradation since that time, maintaining NICMOS detectors at a constant temperature of 77 K. Miniature, high-speed turbomachines are used in the cryocooler and the circulator loop to provide vibration-free, long-life operation. A small centrifugal compressor and miniature turboalternator are key elements of the closed loop cryocooler. A miniature cryogenic centrifugal circulator in a separate pressurized neon loop transports heat from the NICMOS instrument to the cryocooler interface heat exchanger. This paper describes the development of the system, key operational features, ground and orbital tests prior to its deployment, and operational results during its five-year operational history on orbit.

  11. Building Energy Management Open Source Software

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    This is the repository for Building Energy Management Open Source Software (BEMOSS), which is an open source operating system that is engineered to improve sensing and control of equipment in small- and medium-sized commercial buildings. BEMOSS offers the following key features: (1) Open source, open architecture – BEMOSS is an open source operating system that is built upon VOLTTRON – a distributed agent platform developed by Pacific Northwest National Laboratory (PNNL). BEMOSS was designed to make it easy for hardware manufacturers to seamlessly interface their devices with BEMOSS. Software developers can also contribute to adding additional BEMOSS functionalities and applications.more » (2) Plug & play – BEMOSS was designed to automatically discover supported load controllers (including smart thermostats, VAV/RTUs, lighting load controllers and plug load controllers) in commercial buildings. (3) Interoperability – BEMOSS was designed to work with load control devices form different manufacturers that operate on different communication technologies and data exchange protocols. (4) Cost effectiveness – Implementation of BEMOSS deemed to be cost-effective as it was built upon a robust open source platform that can operate on a low-cost single-board computer, such as Odroid. This feature could contribute to its rapid deployment in small- or medium-sized commercial buildings. (5) Scalability and ease of deployment – With its multi-node architecture, BEMOSS provides a distributed architecture where load controllers in a multi-floor and high occupancy building could be monitored and controlled by multiple single-board computers hosting BEMOSS. This makes it possible for a building engineer to deploy BEMOSS in one zone of a building, be comfortable with its operation, and later on expand the deployment to the entire building to make it more energy efficient. (6) Ability to provide local and remote monitoring – BEMOSS provides both local and remote monitoring ability with role-based access control. (7) Security – In addition to built-in security features provided by VOLTTRON, BEMOSS provides enhanced security features, including BEMOSS discovery approval process, encrypted core-to-node communication, thermostat anti-tampering feature and many more. (8) Support from the Advisory Committee – BEMOSS was developed in consultation with an advisory committee from the beginning of the project. BEMOSS advisory committee comprises representatives from 22 organizations from government and industry.« less

  12. Robotic Precursor Missions for Mars Habitats

    NASA Technical Reports Server (NTRS)

    Huntsberger, Terry; Pirjanian, Paolo; Schenker, Paul S.; Trebi-Ollennu, Ashitey; Das, Hari; Joshi, Sajay

    2000-01-01

    Infrastructure support for robotic colonies, manned Mars habitat, and/or robotic exploration of planetary surfaces will need to rely on the field deployment of multiple robust robots. This support includes such tasks as the deployment and servicing of power systems and ISRU generators, construction of beaconed roadways, and the site preparation and deployment of manned habitat modules. The current level of autonomy of planetary rovers such as Sojourner will need to be greatly enhanced for these types of operations. In addition, single robotic platforms will not be capable of complicated construction scenarios. Precursor robotic missions to Mars that involve teams of multiple cooperating robots to accomplish some of these tasks is a cost effective solution to the possible long timeline necessary for the deployment of a manned habitat. Ongoing work at JPL under the Mars Outpost Program in the area of robot colonies is investigating many of the technology developments necessary for such an ambitious undertaking. Some of the issues that are being addressed include behavior-based control systems for multiple cooperating robots (CAMPOUT), development of autonomous robotic systems for the rescue/repair of trapped or disabled robots, and the design and development of robotic platforms for construction tasks such as material transport and surface clearing.

  13. NA22 Model Cities Project - LL244T An Intelligent Transportation System-Based Radiation Alert and Detection System

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Peglow, S

    2004-02-24

    The purpose of this project was twofold: first, provide an understanding of the technical foundation and planning required for deployment of Intelligent Transportation System (ITS)-based system architectures for the protection of New York City from a terrorist attack using a vehicle-deployed nuclear device; second, work with stakeholders to develop mutual understanding of the technologies and tactics required for threat detection/identification and establish guidelines for designing operational systems and procedures. During the course of this project we interviewed and coordinated analysis with people from the New Jersey State Attorney General's office, the New Jersey State Police, the Port Authority of Newmore » York/New Jersey, the Counterterrorism Division of the New York City Police Department, the New Jersey Transit Authority, the State of New Jersey Department of Transportation, TRANSCOM and a number of contractors involved with state and federal intelligent transportation development and implementation. The basic system architecture is shown in the figure below. In an actual system deployment, radiation sensors would be co-located with existing ITS elements and the data will be sent to the Traffic Operations Center. A key element of successful system operation is the integration of vehicle data, such as license plate, EZ pass ID, vehicle type/color and radiation signature. A threat data base can also be implemented and utilized in cases where there is a suspect vehicle identified from other intelligence sources or a mobile detector system. Another key aspect of an operational architecture is the procedures used to verify the threat and plan interdiction. This was a major focus of our work and discussed later in detail. In support of the operational analysis, we developed a detailed traffic simulation model that is described extensively in the body of the report.« less

  14. Airport Remote Tower Sensor Systems

    NASA Technical Reports Server (NTRS)

    Papasin, Richard; Gawdiak, Yuri; Maluf, David A.; Leidich, Christopher; Tran, Peter B.

    2001-01-01

    Remote Tower Sensor Systems (RTSS) are proof-of-concept prototypes being developed by NASA/Ames Research Center (NASA/ARC) with collaboration with the FAA (Federal Aviation Administration) and NOAA (National Oceanic Atmospheric Administration). RTSS began with the deployment of an Airport Approach Zone Camera System that includes real-time weather observations at San Francisco International Airport. The goal of this research is to develop, deploy, and demonstrate remotely operated cameras and sensors at several major airport hubs and un-towered airports. RTSS can provide real-time weather observations of airport approach zone. RTSS will integrate and test airport sensor packages that will allow remote access to realtime airport conditions and aircraft status.

  15. The new Gemini Observatory archive: a fast and low cost observatory data archive running in the cloud

    NASA Astrophysics Data System (ADS)

    Hirst, Paul; Cardenes, Ricardo

    2016-08-01

    We have developed and deployed a new data archive for the Gemini Observatory. Focused on simplicity and ease of use, the archive provides a number of powerful and novel features including automatic association of calibration data with the science data, and the ability to bookmark searches. A simple but powerful API allows programmatic search and download of data. The archive is hosted on Amazon Web Services, which provides us excellent internet connectivity and significant cost savings in both operations and development over more traditional deployment options. The code is written in python, utilizing a PostgreSQL database and Apache web server.

  16. MER : from landing to six wheels on Mars ... twice

    NASA Technical Reports Server (NTRS)

    Krajewski, Joel; Burke, Kevin; Lewicki, Chris; Limonadi, Daniel; Trebi-Ollennu, Ashitey; Voorhees, Chris

    2005-01-01

    Application of the Pathfinder landing system design to enclose the much larger Mars Exploration Rover required a variety of Rover deployments to achieve the surface driving configuration. The project schedule demanded that software design, engineering model test, and flight hardware build to be accomplished in parallel. This challenge was met through (a) bounding unknown environments against which to design and test, (b) early mechanical prototype testing, (c) constraining the scope of on-board autonomy to survival-critical deployments, (d) executing a balance of nominal and off-nominal test cases, (e) developing off-nominal event mitigation techniques before landing, (f) flexible replanning in response to surprises during operations. Here is discussed several specific events encountered during initial MER surface operations.

  17. C-Band Scanning ARM Precipitation Radar (C-SAPR) Handbook

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Widener, K; Bharadwaj, N

    2012-11-13

    The C-band scanning ARM precipitation radar (C-SAPR) is a scanning polarimetric Doppler radar transmitting simultaneously in both H and V polarizations. With a 350-kW magnetron transmitter, this puts 125 kW of transmitted power for each polarization. The receiver for the C-SAPR is a National Center for Atmospheric Research (NCAR) -developed Hi-Q system operating in a coherent-on-receive mode. The ARM Climate Research Facility operates two C-SAPRs; one of them is deployed near the Southern Great Plains (SGP) Central Facility near the triangular array of X-SAPRs, and the second C-SAPR is deployed at ARM’s Tropical Western Pacific (TWP) site on Manus Islandmore » in Papua New Guinea.« less

  18. Dual-Polarization Observations of Precipitation: State of the Art in Operational and Research Applications

    NASA Astrophysics Data System (ADS)

    Chandra, C. V.; Moisseev, D. N.; Baldini, L.; Bechini, R.; Cremonini, R.; Wolff, D. B.; Petersen, W. A.; Junyent, F.; Chen, H.; Beauchamp, R.

    2016-12-01

    Dual-polarization weather radars have been widely used for rainfall measurement applications and studies of the microphysical characteristics of precipitation. Ground-based, dual-polarization radar systems form the cornerstones of national severe weather warning and forecasting infrastructure in many developed countries. As a result of the improved performance of dual-polarization radars for these applications, large scale dual-polarization upgrades are being planned for India and China. In addition to national forecast and warning operations, dual-polarization radars have also been used for satellite ground validation activities. The operational Dual-Polarization radars in the US are mostly S band systems whereas in Europe are mostly C band systems. In addition a third class of systems is emerging in urban regions where networks of X band systems are being deployed operationally. There are successful networks planned or already deployed in big cities such as Dallas Fort Worth, Tokyo or Beijing. These X band networks are developing their own operational domain. In summary a large infrastructure in terms of user specified products and dual use of operational research applications are also emerging in these systems. This paper will discuss some of the innovative uses of the operational dual-polarization radar networks for research purposes, with references to calibration, hydrometeor classification and quantitative precipitation estimation. Additional application to the study of precipitation processes will also be discussed.

  19. The StratusLab cloud distribution: Use-cases and support for scientific applications

    NASA Astrophysics Data System (ADS)

    Floros, E.

    2012-04-01

    The StratusLab project is integrating an open cloud software distribution that enables organizations to setup and provide their own private or public IaaS (Infrastructure as a Service) computing clouds. StratusLab distribution capitalizes on popular infrastructure virtualization solutions like KVM, the OpenNebula virtual machine manager, Claudia service manager and SlipStream deployment platform, which are further enhanced and expanded with additional components developed within the project. The StratusLab distribution covers the core aspects of a cloud IaaS architecture, namely Computing (life-cycle management of virtual machines), Storage, Appliance management and Networking. The resulting software stack provides a packaged turn-key solution for deploying cloud computing services. The cloud computing infrastructures deployed using StratusLab can support a wide range of scientific and business use cases. Grid computing has been the primary use case pursued by the project and for this reason the initial priority has been the support for the deployment and operation of fully virtualized production-level grid sites; a goal that has already been achieved by operating such a site as part of EGI's (European Grid Initiative) pan-european grid infrastructure. In this area the project is currently working to provide non-trivial capabilities like elastic and autonomic management of grid site resources. Although grid computing has been the motivating paradigm, StratusLab's cloud distribution can support a wider range of use cases. Towards this direction, we have developed and currently provide support for setting up general purpose computing solutions like Hadoop, MPI and Torque clusters. For what concerns scientific applications the project is collaborating closely with the Bioinformatics community in order to prepare VM appliances and deploy optimized services for bioinformatics applications. In a similar manner additional scientific disciplines like Earth Science can take advantage of StratusLab cloud solutions. Interested users are welcomed to join StratusLab's user community by getting access to the reference cloud services deployed by the project and offered to the public.

  20. Three years experience with forward-site mass casualty triage-, evacuation-, operating room-, ICU-, and radiography-enabled disaster vehicles: development of usage strategies from drills and deployments.

    PubMed

    Griffiths, Jane L; Kirby, Neil R; Waterson, James A

    2014-01-01

    Delineation of the advantages and problems related to the use of forward-site operating room-, Intensive Care Unit (ICU)-, radiography-, and mass casualty-enabled disaster vehicles for site evacuation, patient stabilization, and triage. The vehicles discussed have six ventilated ICU spaces, two ORs, on-site radiography, 21 intermediate acuity spaces with stretchers, and 54 seated minor acuity spaces. Each space has piped oxygen with an independent vehicle-loaded supply. The vehicles are operated by the Dubai Corporate Ambulance Services. Their support hospital is the main trauma center for the Emirate of Dubai and provides the vehicles' surgical, intensivist, anesthesia, and nursing staff. The disaster vehicles have been deployed 264 times in the last 5 years (these figures do not include deployments for drills). Introducing this new service required extensive initial planning and ongoing analysis of the performance of the disaster vehicles that offer ambulance services and receiving hospitals a large array of possibilities in terms of triage, stabilization of priority I and II patients, and management of priority III patients. In both drills and in disasters, the vehicles were valuable in forward triage and stabilization and in the transport of large numbers of priority III patients. This has avoided the depletion of emergency transport available for priority I and II patients. The successful utilization of disaster vehicles requires seamless cooperation between the hospital staffing the vehicles and the ambulance service deploying them. They are particularly effective during preplanned deployments to high-risk situations. These vehicles also potentially provide self-sufficient refuges for forward teams in hostile environments.

  1. Aerodynamic Decelerators for Planetary Exploration: Past, Present, and Future

    NASA Technical Reports Server (NTRS)

    Cruz, Juna R.; Lingard, J. Stephen

    2006-01-01

    In this paper, aerodynamic decelerators are defined as textile devices intended to be deployed at Mach numbers below five. Such aerodynamic decelerators include parachutes and inflatable aerodynamic decelerators (often known as ballutes). Aerodynamic decelerators play a key role in the Entry, Descent, and Landing (EDL) of planetary exploration vehicles. Among the functions performed by aerodynamic decelerators for such vehicles are deceleration (often from supersonic to subsonic speeds), minimization of descent rate, providing specific descent rates (so that scientific measurements can be obtained), providing stability (drogue function - either to prevent aeroshell tumbling or to meet instrumentation requirements), effecting further aerodynamic decelerator system deployment (pilot function), providing differences in ballistic coefficients of components to enable separation events, and providing height and timeline to allow for completion of the EDL sequence. Challenging aspects in the development of aerodynamic decelerators for planetary exploration missions include: deployment in the unusual combination of high Mach numbers and low dynamic pressures, deployment in the wake behind a blunt-body entry vehicle, stringent mass and volume constraints, and the requirement for high drag and stability. Furthermore, these aerodynamic decelerators must be qualified for flight without access to the exotic operating environment where they are expected to operate. This paper is an introduction to the development and application of aerodynamic decelerators for robotic planetary exploration missions (including Earth sample return missions) from the earliest work in the 1960s to new ideas and technologies with possible application to future missions. An extensive list of references is provided for additional study.

  2. Capturing the Impact of Storage and Other Flexible Technologies on Electric System Planning

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hale, Elaine; Stoll, Brady; Mai, Trieu

    Power systems of the future are likely to require additional flexibility. This has been well studied from an operational perspective, but has been more difficult to incorporate into capacity expansion models (CEMs) that study investment decisions on the decadal scale. There are two primary reasons for this. First, the necessary input data, including cost and resource projections, for flexibility options like demand response and storage are significantly uncertain. Second, it is computationally difficult to represent both investment and operational decisions in detail, the latter being necessary to properly value system flexibility, in CEMs for realistically sized systems. In this work,more » we extend a particular CEM, NREL's Resource Planning Model (RPM), to address the latter issue by better representing variable generation impacts on operations, and then adding two flexible technologies to RPM's suite of investment decisions: interruptible load and utility-scale storage. This work does not develop full suites of input data for these technologies, but is rather methodological and exploratory in nature. We thus exercise these new investment decisions in the context of exploring price points and value streams needed for significant deployment in the Western Interconnection by 2030. Our study of interruptible load finds significant variation by location, year, and overall system conditions. Some locations find no system need for interruptible load even with low costs, while others build the most expensive resources offered. System needs can include planning reserve capacity needs to ensure resource adequacy, but there are also particular cases in which spinning reserve requirements drive deployment. Utility-scale storage is found to require deep cost reductions to achieve wide deployment and is found to be more valuable in some locations with greater renewable deployment. Differences between more solar- and wind-reliant regions are also found: Storage technologies with lower energy capacities are deployed to support solar deployment, and higher energy capacity technologies support wind. Finally, we identify potential future research and areas of improvement to build on this initial analysis.« less

  3. Airport Visibility Measuring Systems Elements of Deployment Cost Analysis

    DOT National Transportation Integrated Search

    1976-09-01

    This report analyzes the deployment cost for different visibility measuring systems necessary to satisfy CAT I, II, and II operations. The analysis is based on airport operational requirements and data for commercially available visibility measuring ...

  4. State fiscal implications of intelligent transportation systems/commercial vehicle operations deployment

    DOT National Transportation Integrated Search

    1998-01-01

    As states begin to consider full-scale deployment of intelligent transportation system (ITS) technologies to support commercial vehicle operations (CVO), Governors and state legislatures will need answers to the following questions: (1) What savings ...

  5. Psychological Operations: Fighting the War of Ideas

    DTIC Science & Technology

    2007-05-18

    is the success of the Joint Interagency Task Force on the Former Regime Elements (JIATF- FRE) operation to capture Fadhil Ibrahim Habib al-Mashadani... DAPS ), Fly Away Broadcast System (FABS), and Target Audience Analysis Detachment (TAAD). This provides the Brigade a radio development and broadcast...level. Production and dissemination assets must include a Modular Print System (MPS), Deployable Audio Production Suite ( DAPS ), and Special

  6. ITS/CVO technical project management for non-technical managers : participant guide

    DOT National Transportation Integrated Search

    1998-09-01

    In 1996, the FHWA Office of Motor Carriers (OMC) identified the need to develop a Technical Training Program to support the deployment of Intelligent Transportation System (ITS) technologies for Commercial Vehicle Operations (CVO). The workforce -...

  7. 78 FR 18415 - Connected Vehicle Reference Implementation Architecture Workshop; Notice of Public Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-26

    ... DEPARTMENT OF TRANSPORTATION Connected Vehicle Reference Implementation Architecture Workshop...) Intelligent Transportation System Joint Program Office (ITS JPO) will host a free Connected Vehicle Reference... manufacturing, developing, deploying, operating, or maintaining the connected [[Page 18416

  8. Deploying a Route Optimization EFB Application for Commercial Airline Operational Trials

    NASA Technical Reports Server (NTRS)

    Roscoe, David A.; Vivona, Robert A.; Woods, Sharon E.; Karr, David A.; Wing, David J.

    2016-01-01

    The Traffic Aware Planner (TAP), developed for NASA Langley Research Center to support the Traffic Aware Strategic Aircrew Requests (TASAR) project, is a flight-efficiency software application developed for an Electronic Flight Bag (EFB). Tested in two flight trials and planned for operational testing by two commercial airlines, TAP is a real-time trajectory optimization application that leverages connectivity with onboard avionics and broadband Internet sources to compute and recommend route modifications to flight crews to improve fuel and time performance. The application utilizes a wide range of data, including Automatic Dependent Surveillance Broadcast (ADS-B) traffic, Flight Management System (FMS) guidance and intent, on-board sensors, published winds and weather, and Special Use Airspace (SUA) schedules. This paper discusses the challenges of developing and deploying TAP to various EFB platforms, our solutions to some of these challenges, and lessons learned, to assist commercial software developers and hardware manufacturers in their efforts to implement and extend TAP functionality in their environments. EFB applications (such as TAP) typically access avionics data via an ARINC 834 Simple Text Avionics Protocol (STAP) server hosted by an Aircraft Interface Device (AID) or other installed hardware. While the protocol is standardized, the data sources, content, and transmission rates can vary from aircraft to aircraft. Additionally, the method of communicating with the AID may vary depending on EFB hardware and/or the availability of onboard networking services, such as Ethernet, WIFI, Bluetooth, or other mechanisms. EFBs with portable and installed components can be implemented using a variety of operating systems, and cockpits are increasingly incorporating tablet-based technologies, further expanding the number of platforms the application may need to support. Supporting multiple EFB platforms, AIDs, avionics datasets, and user interfaces presents a challenge for software developers and the management of their code baselines. Maintaining multiple baselines to support all deployment targets can be extremely cumbersome and expensive. Certification also needs to be considered when developing the application. Regardless of whether the software is itself destined to be certified, data requirements in support of the application and user interface elements may introduce certification requirements for EFB manufacturers and the airlines. The example of TAP, the challenges faced, solutions implemented, and lessons learned will give EFB application and hardware developers insight into future potential requirements in deploying TAP or similar flight-deck EFB applications.

  9. A squeezed light source operated under high vacuum

    PubMed Central

    Wade, Andrew R.; Mansell, Georgia L.; Chua, Sheon S. Y.; Ward, Robert L.; Slagmolen, Bram J. J.; Shaddock, Daniel A.; McClelland, David E.

    2015-01-01

    Non-classical squeezed states of light are becoming increasingly important to a range of metrology and other quantum optics applications in cryptography, quantum computation and biophysics. Applications such as improving the sensitivity of advanced gravitational wave detectors and the development of space-based metrology and quantum networks will require robust deployable vacuum-compatible sources. To date non-linear photonics devices operated under high vacuum have been simple single pass systems, testing harmonic generation and the production of classically correlated photon pairs for space-based applications. Here we demonstrate the production under high-vacuum conditions of non-classical squeezed light with an observed 8.6 dB of quantum noise reduction down to 10 Hz. Demonstration of a resonant non-linear optical device, for the generation of squeezed light under vacuum, paves the way to fully exploit the advantages of in-vacuum operations, adapting this technology for deployment into new extreme environments. PMID:26657616

  10. A squeezed light source operated under high vacuum

    NASA Astrophysics Data System (ADS)

    Wade, Andrew R.; Mansell, Georgia L.; Chua, Sheon S. Y.; Ward, Robert L.; Slagmolen, Bram J. J.; Shaddock, Daniel A.; McClelland, David E.

    2015-12-01

    Non-classical squeezed states of light are becoming increasingly important to a range of metrology and other quantum optics applications in cryptography, quantum computation and biophysics. Applications such as improving the sensitivity of advanced gravitational wave detectors and the development of space-based metrology and quantum networks will require robust deployable vacuum-compatible sources. To date non-linear photonics devices operated under high vacuum have been simple single pass systems, testing harmonic generation and the production of classically correlated photon pairs for space-based applications. Here we demonstrate the production under high-vacuum conditions of non-classical squeezed light with an observed 8.6 dB of quantum noise reduction down to 10 Hz. Demonstration of a resonant non-linear optical device, for the generation of squeezed light under vacuum, paves the way to fully exploit the advantages of in-vacuum operations, adapting this technology for deployment into new extreme environments.

  11. 75 FR 60573 - Federal Employees' Group Life Insurance Program: Miscellaneous Changes, Clarifications, and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-01

    ... civilian employees deployed in support of a contingency operation, to elect Basic insurance, Option A... after the operations of the Senate Restaurants are contracted to be performed by a private business... for Basic insurance coverage and is deployed in support of a contingency operation as defined by...

  12. What pre-deployment and early post-deployment factors predict health function after combat deployment?: a prospective longitudinal study of Operation Enduring Freedom (OEF)/Operation Iraqi Freedom (OIF) soldiers

    PubMed Central

    2013-01-01

    Background Physical and mental function are strong indicators of disability and mortality. OEF/OIF Veterans returning from deployment have been found to have poorer function than soldiers who have not deployed; however the reasons for this are unknown. Methods A prospective cohort of 790 soldiers was assessed both pre- and immediately after deployment to determine predictors of physical and mental function after war. Results On average, OEF/OIF Veterans showed significant declines in both physical (t=6.65, p<.0001) and mental function (t=7.11, p<.0001). After controlling for pre-deployment function, poorer physical function after deployment was associated with older age, more physical symptoms, blunted systolic blood pressure reactivity and being injured. After controlling for pre-deployment function, poorer mental function after deployment was associated with younger age, lower social desirability, lower social support, greater physical symptoms and greater PTSD symptoms. Conclusions Combat deployment was associated with an immediate decline in both mental and physical function. The relationship of combat deployment to function is complex and influenced by demographic, psychosocial, physiological and experiential factors. Social support and physical symptoms emerged as potentially modifiable factors. PMID:23631419

  13. Kosovo’s Support of NATO Stability and Humanitarian Operations

    DTIC Science & Technology

    2013-12-13

    America. In this aspect, non-recognition of Kosovo’s independence from Spain, Greece, Slovakia and Romania (all NATO member countries) is affecting...including: General Staff Publication, and publication of The War College, and Army Command and General Staff College. However, some sources (mostly...countries faced during the first phase of deployment, during deployment and after deployment in stability operations. 3. Kosovo’s national interest to be

  14. Photovoltaic Power System and Power Distribution Demonstration for the Desert RATS Program

    NASA Technical Reports Server (NTRS)

    Colozza, Anthony; Jakupca, Ian; Mintz, Toby; Herlacher, Mike; Hussey, Sam

    2012-01-01

    A stand alone, mobile photovoltaic power system along with a cable deployment system was designed and constructed to take part in the Desert Research And Technology Studies (RATS) lunar surface human interaction evaluation program at Cinder Lake, Arizona. The power system consisted of a photovoltaic array/battery system. It is capable of providing 1 kW of electrical power. The system outputs were 48 V DC, 110 V AC, and 220 V AC. A cable reel with 200 m of power cable was used to provide power from the trailer to a remote location. The cable reel was installed on a small trailer. The reel was powered to provide low to no tension deployment of the cable. The cable was connected to the 220 V AC output of the power system trailer. The power was then converted back to 110 V AC on the cable deployment trailer for use at the remote site. The Scout lunar rover demonstration vehicle was used to tow the cable trailer and deploy the power cable. This deployment was performed under a number of operational scenarios, manned operation, remote operation and tele-robotically. Once deployed, the cable was used to provide power, from the power system trailer, to run various operational tasks at the remote location.

  15. Problems with veteran-family communication during operation enduring freedom/operation Iraqi freedom military deployment.

    PubMed

    Hinojosa, Ramon; Hinojosa, Melanie Sberna; Högnäs, Robin S

    2012-02-01

    Twenty Reserve component (Army and Marines) and Army National Guard male veterans of Operational Enduring Freedom/Operation Iraqi Freedom discuss their deployment and postdeployment family reintegration experiences. A Grounded Theory approach is used to highlight some of the ways in which family miscommunication during deployment can occur. Communication with civilian family members is affected by the needs of operational security, technical problems with communication tools, miscommunication between family members, or because veterans have "nothing new to say" to family back home. These communication difficulties may lead to an initial gulf of understanding between veterans and family members that can cause family strain during postdeployment family reintegration. We end with a discussion of veteran family reintegration difficulties.

  16. The Propulsive Small Expendable Deployer System (ProSEDS)

    NASA Technical Reports Server (NTRS)

    Lorenzini, Enrico C.

    2002-01-01

    This Annual Report covers the following main topics: 1) Updated Reference Mission. The reference ProSEDS (Propulsive Small Expendable Deployer System) mission is evaluated for an updated launch date in the Summer of 2002 and for the new 80-s current operating cycle. Simulations are run for nominal solar activity condition at the time of launch and for extreme conditions of dynamic forcing. Simulations include the dynamics of the system, the electrodynamics of the bare tether, the neutral atmosphere and the thermal response of the tether. 2) Evaluation of power delivered by the tether system. The power delivered by the tethered system during the battery charging mode is computed under the assumption of minimum solar activity for the new launch date. 3) Updated Deployment Control Profiles and Simulations. A number of new deployment profiles were derived based on the latest results of the deployment ground tests. The flight profile is then derived based on the friction characteristics obtained from the deployment tests of the F-1 tether. 4) Analysis/estimation of deployment flight data. A process was developed to estimate the deployment trajectory of the endmass with respect to the Delta and the final libration amplitude from the data of the deployer turn counters. This software was tested successfully during the ProSEDS mission simulation at MSFC (Marshall Space Flight Center) EDAC (Environments Data Analysis Center).

  17. Calibration and deployment of custom-designed bioreporters for protecting biological remediation consortia from toxic shock.

    PubMed

    Wiles, Siouxsie; Lilley, Andrew K; Philp, Jim C; Bailey, Mark J; Whiteley, Andrew S

    2005-02-01

    We have previously described the development of a panel of site-specific lux-based bioreporters from an industrial wastewater treatment system remediating coking effluents. The Pseudomonad strains carry a stable chromosomal copy of the luxCDABE operon from Photorhabdus luminescens and display proportional responses in bioluminescence decay with increasing phenol concentration up to 800 mg l-1. In this work we describe their deployment to provide a strategic sensing network for protecting bacterial communities involved in the biological breakdown of coking effluents. This evaluation demonstrated the utility of strategic placement of reporters around heavy industry treatment systems and the reliability of the reporter strains under normal operational conditions. Mono-phenol or total phenolic variation within the treatment system accounted for>65-80% of the luminescence response. The reporters exhibited stable luminescence output during normal operations with maximum standard deviations of luminescence over time of c. 5-15% depending on the treatment compartment. Furthermore, deployment of the bioreporters over a 5-month period allowed the determination of an operational range (OR) for each reporter for effluent samples from each compartment. The OR allowed a convenient measure of toxicity effects between treatment compartments and accurately reflected a specific pollution event occurring within compartments of the treatment system. This work demonstrates the utility of genetic modification to provide ecologically relevant bioreporters, extends the sensing capabilities currently obtained through marine derived biosensors and significantly enhances the potential for in situ deployment of reporting agents.

  18. Automating Mid- and Long-Range Scheduling for the NASA Deep Space Network

    NASA Technical Reports Server (NTRS)

    Johnston, Mark D.; Tran, Daniel

    2012-01-01

    NASA has recently deployed a new mid-range scheduling system for the antennas of the Deep Space Network (DSN), called Service Scheduling Software, or S(sup 3). This system was designed and deployed as a modern web application containing a central scheduling database integrated with a collaborative environment, exploiting the same technologies as social web applications but applied to a space operations context. This is highly relevant to the DSN domain since the network schedule of operations is developed in a peer-to-peer negotiation process among all users of the DSN. These users represent not only NASA's deep space missions, but also international partners and ground-based science and calibration users. The initial implementation of S(sup 3) is complete and the system has been operational since July 2011. This paper describes some key aspects of the S(sup 3) system and on the challenges of modeling complex scheduling requirements and the ongoing extension of S(sup 3) to encompass long-range planning, downtime analysis, and forecasting, as the next step in developing a single integrated DSN scheduling tool suite to cover all time ranges.

  19. 76 FR 72242 - Proposed Information Collection (Survey of Post-Deployment Adjustment Among OEF and OIF Veterans...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-22

    ... identify gender-specific treatment needs of returning Operation Enduring Freedom (OEF) and Operation Iraqi... deployed to Afghanistan and/or Iraq. The goal is to identify the gender-specific treatment needs of...

  20. Deployment and Adverse Pregnancy Outcomes: Primary Findings and Methodological Considerations.

    PubMed

    Katon, Jodie; Cypel, Yasmin; Raza, Mubashra; Zephyrin, Laurie; Reiber, Gayle; Yano, Elizabeth M; Barth, Shannon; Schneiderman, Aaron

    2017-02-01

    Objective To characterize the pregnancy outcomes of women Operation Enduring Freedom/Operation Iraqi Freedom (OEF/OIF) Veterans including prevalence of preterm delivery, low birth weight, and macrosomia, and to highlight methodological limitations that can impact findings. Methods A retrospective cohort study was conducted starting in 2014 analyzing data from the 2009 to 2011 National Health Study for a New Generation of US Veterans, which sampled Veterans deployed and not deployed to OIF/OEF. All pregnancies resulting in a live birth were included, and categorized as occurring among non-deployers, before deployment, during deployment, or after deployment. Outcomes included preterm birth, low birth weight, and macrosomia. The association of deployment with selected outcomes was estimated using separate general estimating equations to account for lack of outcome independence among women contributing multiple pregnancies. Adjustment variables included maternal age at outcome, and race/ethnicity. Results There were 2276 live births (191 preterm births, 153 low birth weight infants, and 272 macrosomic infants). Compared with pregnancies before deployment, pregnancies among non-deployers and those after deployment appeared to have greater risk of preterm birth [non-deployers: odds ratio (OR) = 2.16, 95 % confidence interval (CI) 1.25, 3.72; after deployment: OR = 1.90, 95 % CI 0.90, 4.02]. A similar pattern was observed for low birth weight. No association of deployment with macrosomia was detected. Discussion Compared with non-deployers, those who eventually deploy appear to have better pregnancy outcomes prior to deployment, but this advantage is no longer apparent after deployment. Non-deployers may not be an appropriate reference group to study the putative health impacts of deployment on pregnancy outcomes.

  1. DOTD support for UTC project : development of an optimal ramp metering control strategy for I-12, [research project capsule].

    DOT National Transportation Integrated Search

    2013-10-01

    From June to November of 2010, the Louisiana Department of Transportation and : Development (DOTD) deployed ramp metering control, using a simple pre-timed operation : with a xed cycle length (2 seconds of green/2 seconds of red), along a 15-mile ...

  2. Development and Deployment of a Library of Industrially Focused Advanced Immersive VR Learning Environments

    ERIC Educational Resources Information Center

    Cameron, Ian; Crosthwaite, Caroline; Norton, Christine; Balliu, Nicoleta; Tadé, Moses; Hoadley, Andrew; Shallcross, David; Barton, Geoff

    2008-01-01

    This work presents a unique education resource for both process engineering students and the industry workforce. The learning environment is based around spherical imagery of real operating plants coupled with interactive embedded activities and content. This Virtual Reality (VR) learning tool has been developed by applying aspects of relevant…

  3. Enhanced Logistics Intra-theater Support Tool

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Van Groningen, Charles N.; Braun, Mary Duffy; Widing, Mary Ann

    2004-01-27

    Developed for use by Department of Defense deployment analysts to perform detailed Reception, Staging, Onward movement and Integration (RSO&I) analyses. ELIST requires: o Vehicle characteristics for ships, planes, trucks, railcars, buses, and helicopters. o Network (physical) characteristics defining the airport, seaport, road, rail, waterway and pipeline infrastructure available in a theater of operations. o Assets available for moving the personnel, equipment and supplies over the infrastructure network. o Movement requirements plan defining the deployment requirements of a military force. This includes defining each unit, its cargo (at various levels of resolution) , where it must move from and to, whatmore » modes it is required to travel by, and when it must be delivered through each phase of deployment.« less

  4. Open Path Trace Gas Laser Sensors for UAV Deployment

    NASA Astrophysics Data System (ADS)

    Shadman, S.; Mchale, L.; Rose, C.; Yalin, A.

    2015-12-01

    Novel trace gas sensors based on open-path Cavity Ring-down Spectroscopy (CRDS) are being developed to enable remote and mobile deployments including on small unmanned aerial systems (UAS). Relative to established closed-path CRDS instruments, the use of open-path configurations allows removal of the bulky and power hungry vacuum and flow system, potentially enabling lightweight and low power instruments with high sensitivity. However, open path operation introduces new challenges including the need to maintain mirror cleanliness, mitigation of particle optical effects, and the need to measure spectral features that are relatively broad. The present submission details open-path CRDS instruments for ammonia and methane and their planned use in UAS studies. The ammonia sensor uses a quantum cascade laser at 10.3 mm in a configuration in which the laser frequency is continuously swept and a trigger circuit and acousto-optic modulator (AOM) extinguish the light when the laser is resonant with the cavity. Ring-down signals are measured with a two-stage thermoelectrically cooled MCT photodetector. The cavity mirrors have reflectivity of 0.9995 and a noise equivalent absorption of 1.5 ppb Hz-1/2 was demonstrated. A first version of the methane sensor operated at 1.7um with a telecom diode laser while the current version operates at 3.6 um with an interband cascade laser (stronger absorption). We have performed validation measurements against known standards for both sensors. Compact optical assemblies are being developed for UAS deployment. For example, the methane sensor head will have target mass of <4 kg and power draw <40 W. A compact single board computer and DAQ system is being designed for sensor control and signal processing with target mass <1 kg and power draw <10 W. The sensor size and power parameters are suitable for UAS deployment on both fixed wing and rotor style UAS. We plan to deploy the methane sensor to measure leakage and emission of methane from natural gas infrastructure, and to deploy both sensors together to study emissions from dairies and feedlots. The latter measurement campaign will also examine ammonia deposition to the ground, and bi-directional ammonia fluxes, using methane as a conservative tracer and examining the change in the ratio of ammonia to methane as a function of downwind position.

  5. Psychological screening program overview.

    PubMed

    Wright, Kathleen M; Huffman, Ann H; Adler, Amy B; Castro, Carl A

    2002-10-01

    This article reviews the literature on health surveillance conducted during military deployments, focusing on models for assessing the impact of operational deployments on peacekeepers. A discussion of the stressors and potential mental health consequences of peacekeeping operations follows with relevant examples of findings from U.S. and international military forces. Psychological screening in different peacekeeping operations conducted in U.S. Army-Europe is reviewed. The review begins with the redeployment screening of military personnel deployed to Bosnia mandated under the Joint Medical Surveillance Program, and continues through the present screening of units deployed to Kosovo. The detailed description of the screening program includes a discussion of procedures and measures and demonstrates the evolution of the program. A summary of key findings from the screening program and a discussion of future research directions are provided.

  6. International standards for pandemic screening using infrared thermography

    NASA Astrophysics Data System (ADS)

    Pascoe, D. D.; Ring, E. F.; Mercer, J. B.; Snell, J.; Osborn, D.; Hedley-Whyte, J.

    2010-03-01

    The threat of a virulent strain of influenza, severe acute respiratory syndrome (SARS), tuberculosis, H1N1/A virus (swine flu) and possible mutations are a constant threat to global health. Implementation of pandemic infrared thermographic screening is based on the detection of febrile temperatures (inner canthus of the eyes) that are correlated with an infectious disease. Previous attempts at pandemic thermal screening have experienced problems (e.g. SARS outbreak, Singapore 2003) associated with the deployment plan, implementation and operation of the screening thermograph. Since this outbreak, the International Electrotechnical Commission has developed international standards that set minimum requirements for thermographic system fever screening and procedures that insure reliable and reproducible measurements. These requirements are published in IEC 80601-2-59:2008, Medical electrical equipment - Part 2-59: Particular requirements for the basic safety and essential performance of screening thermographs for human febrile temperature screening. The International Organization for Standardization has developed ISO/TR 13154:2009, Medical Electrical Equipment - which provides deployment, implementation and operational guidelines for identifying febrile humans using a screening thermograph. These new standards includes recommendations for camera calibrations, use of black body radiators, view field, focus, pixels within measurement site, image positioning, and deployment locations. Many current uses of thermographic screening at airports do not take into account critical issues addressed in the new standard, and are operating below the necessary effectiveness and efficiency. These documents, related thermal research, implications for epidemiology screening, and the future impact on medical thermography are discussed.

  7. Aircraft operations classification system : technical summary.

    DOT National Transportation Integrated Search

    1999-07-01

    In this project, we consider the development and deployment of systems for measuring aircraft activity at airports. This would include determining the type of aircraft and the type of aircraft activity. The type of aircraft is a basic type such as he...

  8. 78 FR 50399 - Spectrum Monitoring Pilot Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-19

    ... National Telecommunications and Information Administration (NTIA) to design and conduct a pilot program to... to Congress for fiscal year (FY) 2014 seeks an initial $7.5 million research and development... design, features, deployment options, operational parameters, expected utility, potential benefits, and...

  9. ALDOT Bridge Bureau : structures design and detail manual.

    DOT National Transportation Integrated Search

    2008-01-01

    Throughout the 90's the nation as a whole has been witnessing significant activities in the area of ITS. It began with research and development, early deployment planning (EDP), field operational tests, and continued on with the National ITS Architec...

  10. Air Quality Programs and Provisions of the Intermodal Surface Transportation Efficiency Act of 1991

    DOT National Transportation Integrated Search

    2012-11-01

    The US DOT sponsored Dynamic Mobility Applications (DMA) program seeks to identify, develop, and deploy applications that leverage the full potential of connected vehicles, travelers and infrastructure to enhance current operational practices and tra...

  11. Effects of Deployment Investment on the Growth of the Biofuels Industry. 2016 Update

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Vimmerstedt, Laura J.; Warner, Ethan S.; Stright, Dana

    This report updates the 2013 report of the same title. Some text originally published in that report is retained and indicated in gray. In support of the national goals for biofuel use in the United States, numerous technologies have been developed that convert biomass to biofuels. Some of these biomass to biofuel conversion technology pathways are operating at commercial scales, while others are in earlier stages of development. The advancement of a new pathway toward commercialization involves various types of progress, including yield improvements, process engineering, and financial performance. Actions of private investors and public programs can accelerate the demonstrationmore » and deployment of new conversion technology pathways. These investors (both private and public) will pursue a range of pilot, demonstration, and pioneer scale biorefinery investments; the most cost-effective set of investments for advancing the maturity of any given biomass to biofuel conversion technology pathway is unknown. In some cases, whether or not the pathway itself will ultimately be technically and financially successful is also unknown. This report presents results from the Biomass Scenario Model--a system dynamics model of the biomass to biofuels system--that estimate effects of investments in biorefineries at different maturity levels and operational scales. The report discusses challenges in estimating effects of such investments and explores the interaction between this deployment investment and a volumetric production incentive. Model results show that investments in demonstration and deployment have a substantial growth impact on the development of the biofuels industry. Results also show that other conditions, such as accompanying incentives, have major impacts on the effectiveness of such investments. Results from the 2013 report are compared to new results. This report does not advocate for or against investments, incentives, or policies, but analyzes simulations of their hypothetical effects.« less

  12. Evaluating the Cost, Safety, and Proliferation Risks of Small Floating Nuclear Reactors.

    PubMed

    Ford, Michael J; Abdulla, Ahmed; Morgan, M Granger

    2017-11-01

    It is hard to see how our energy system can be decarbonized if the world abandons nuclear power, but equally hard to introduce the technology in nonnuclear energy states. This is especially true in countries with limited technical, institutional, and regulatory capabilities, where safety and proliferation concerns are acute. Given the need to achieve serious emissions mitigation by mid-century, and the multidecadal effort required to develop robust nuclear governance institutions, we must look to other models that might facilitate nuclear plant deployment while mitigating the technology's risks. One such deployment paradigm is the build-own-operate-return model. Because returning small land-based reactors containing spent fuel is infeasible, we evaluate the cost, safety, and proliferation risks of a system in which small modular reactors are manufactured in a factory, and then deployed to a customer nation on a floating platform. This floating small modular reactor would be owned and operated by a single entity and returned unopened to the developed state for refueling. We developed a decision model that allows for a comparison of floating and land-based alternatives considering key International Atomic Energy Agency plant-siting criteria. Abandoning onsite refueling is beneficial, and floating reactors built in a central facility can potentially reduce the risk of cost overruns and the consequences of accidents. However, if the floating platform must be built to military-grade specifications, then the cost would be much higher than a land-based system. The analysis tool presented is flexible, and can assist planners in determining the scope of risks and uncertainty associated with different deployment options. © 2017 Society for Risk Analysis.

  13. Computer-aided dispatch--traffic management center field operational test final detailed test plan : WSDOT deployment

    DOT National Transportation Integrated Search

    2003-10-01

    The purpose of this document is to expand upon the evaluation components presented in "Computer-aided dispatch--traffic management center field operational test final evaluation plan : WSDOT deployment". This document defines the objective, approach,...

  14. The Federal Nursing Service Award. Individual readiness in nursing.

    PubMed

    Reineck, C

    1999-04-01

    Individual readiness is critical for effective nursing in deployed environments. Although readiness is routinely tracked and reported, a study of its complexity among federal nurses was needed. An inductive research approach clarified the concept of individual readiness. Representing a broad range of deployment experience, focus group members developed a definition of the concept and identified six components: clinical competency; operational competency; survival skills; personal/psychosocial/physical readiness; leadership and administrative support; and group integration and identification. The findings form an overdue conceptual basis for future measurement of this important dimension of federal nursing.

  15. A deployable .015 inch diameter wire antenna

    NASA Technical Reports Server (NTRS)

    Dibiasi, L.

    1979-01-01

    This mechanism was developed to dispense a small diameter wire which serves as a receiving antenna for electric field measurements on an Earth orbiting satellite. The antenna is deployed radially from a spinning satellite. A brushless dc motor drives a storage spool to dispense the wire at a controlled rate. Centrifugal force, acting on a mass attached to the end of the wire, keeps the wire in the radial position. The mechanism design, testing, and performance characteristics are discussed. Finally, operational data of the mechanism while in orbit are presented.

  16. Experiences with the ALICE Mesos infrastructure

    NASA Astrophysics Data System (ADS)

    Berzano, D.; Eulisse, G.; Grigoraş, C.; Napoli, K.

    2017-10-01

    Apache Mesos is a resource management system for large data centres, initially developed by UC Berkeley, and now maintained under the Apache Foundation umbrella. It is widely used in the industry by companies like Apple, Twitter, and Airbnb and it is known to scale to 10 000s of nodes. Together with other tools of its ecosystem, such as Mesosphere Marathon or Metronome, it provides an end-to-end solution for datacenter operations and a unified way to exploit large distributed systems. We present the experience of the ALICE Experiment Offline & Computing in deploying and using in production the Apache Mesos ecosystem for a variety of tasks on a small 500 cores cluster, using hybrid OpenStack and bare metal resources. We will initially introduce the architecture of our setup and its operation, we will then describe the tasks which are performed by it, including release building and QA, release validation, and simple Monte Carlo production. We will show how we developed Mesos enabled components (called “Mesos Frameworks”) to carry out ALICE specific needs. In particular, we will illustrate our effort to integrate Work Queue, a lightweight batch processing engine developed by University of Notre Dame, which ALICE uses to orchestrate release validation. Finally, we will give an outlook on how to use Mesos as resource manager for DDS, a software deployment system developed by GSI which will be the foundation of the system deployment for ALICE next generation Online-Offline (O2).

  17. Light Armored Reconnaissance: Misunderstood and Underemployed in Deep Operations

    DTIC Science & Technology

    2010-04-01

    then CoB 2na LA! Bn deploys in support of Operation NIMROD DANCER in Panama Dec 1989 Co D, 2d LA! Bn deploys in support of Operation JUST CAUSE in...Marine Corns Long- Range Plan (MLRP) and U.S. Marine Corps Mid-Range Plan (MMRP). An analysis of the threat discussed in these documents reveals

  18. Implementing Strategic Planning Capabilities Within the Mars Relay Operations Service

    NASA Technical Reports Server (NTRS)

    Hy, Franklin

    2011-01-01

    Throughout this development and deployment process we have followed a few guiding principles: (1) Ensure ubiquitous access through ReSTful and web interfaces; (2) Design a system that is mission and even planet agnostic so that future missions may be added with little hassle, and the system itself may be redeployed for other planetary relay networks; (3) Accept constant input and feedback between mission operators and the development team to ensure that there is a useful product that may be used for years to come.

  19. Maximising Defence Capability Through R&D: A Review of Defence Research and Development

    DTIC Science & Technology

    2007-10-01

    Armoured Armoured Fighting Fighting Vehicles Vehicles Other 2.0% C41STAR Other 2.4% C41STAR 10.2% CBRN 5.4% Fixed Wing General Helicopters No DIS Sector... Armoured Trials Development Unit and with operational units deployed in Iraq. The Commanding Officer of the operational unit reported that the camera...other organisations, while high staff- turnover risks a lack of awareness of background R&D sponsored previously within the IPT. As a result, IPTs

  20. Sampling Approaches for Multi-Domain Internet Performance Measurement Infrastructures

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Calyam, Prasad

    2014-09-15

    The next-generation of high-performance networks being developed in DOE communities are critical for supporting current and emerging data-intensive science applications. The goal of this project is to investigate multi-domain network status sampling techniques and tools to measure/analyze performance, and thereby provide “network awareness” to end-users and network operators in DOE communities. We leverage the infrastructure and datasets available through perfSONAR, which is a multi-domain measurement framework that has been widely deployed in high-performance computing and networking communities; the DOE community is a core developer and the largest adopter of perfSONAR. Our investigations include development of semantic scheduling algorithms, measurement federationmore » policies, and tools to sample multi-domain and multi-layer network status within perfSONAR deployments. We validate our algorithms and policies with end-to-end measurement analysis tools for various monitoring objectives such as network weather forecasting, anomaly detection, and fault-diagnosis. In addition, we develop a multi-domain architecture for an enterprise-specific perfSONAR deployment that can implement monitoring-objective based sampling and that adheres to any domain-specific measurement policies.« less

  1. PC-based automation system streamlines operations

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bowman, J.

    1995-10-01

    The continued emergence of PC-based automation systems in the modern compressor station is driving the need for personnel who have the special skills need to support them. However, the dilemma is that operating budget restraints limit the overall number of people available to operate and maintain compressor stations. An ideal solution is to deploy automation systems which can be easily understood and supported by existing compressor station personnel. This paper reviews such a system developed by Waukesha-Pearce Industries, Inc.

  2. Deploying advanced public transportation systems in Birmingham

    DOT National Transportation Integrated Search

    2003-08-01

    Advanced Public Transportation Systems (APTS) technologies have been deployed by many urban transit systems in order to improve efficiency, reduce operating costs, and improve service quality. The majority of : these deployments, however, have been i...

  3. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Easton, C. R.

    The objectives of this program are to establish a heliostat design with the associated manufacturing, assembly, installation and maintenance approaches that will: (1) yield a significant reduction of capital and operating costs; (2) meet performance specifications for large collector subsystems; and (3) can be produced and deployed throughout the southwestern United States. In addition, cost plans and schedules to develop, fabricate, and operate the heliostat are to be developed. This volume presents the collector design, including trade study and test results, and the manufacturing, installation and checkout, and operations and maintenance concepts. Also, a discussion of specification verification and optimizationmore » is included. (WHK)« less

  4. Deployed Analyst History Report, Volume 2. Analytic Support to Combat Operations in the Philippines (2011-2014)

    DTIC Science & Technology

    2015-12-01

    Army Training and Doctrine Command (TRADOC) Analysis Center (TRAC) to the Philippines for Operation ENDURING FREEDOM – Philippines (OEF-P). PROJECT...management, doctrine and force development, training management, system testing, system acquisition, decision analysis, and resource management, as...influenced procurement decisions and reshaped Army doctrine . Additionally, CAA itself has benefited in numerous ways. Combat experience provides analysts

  5. Enabling CoO improvement thru green initiatives

    NASA Astrophysics Data System (ADS)

    Gross, Eric; Padmabandu, G. G.; Ujazdowski, Richard; Haran, Don; Lake, Matt; Mason, Eric; Gillespie, Walter

    2015-03-01

    Chipmakers continued pressure to drive down costs while increasing utilization requires development in all areas. Cymer's commitment to meeting customer's needs includes developing solutions that enable higher productivity as well as lowering cost of lightsource operation. Improvements in system power efficiency and predictability were deployed to chipmakers' in 2014 with release of our latest Master Oscillating gas chamber. In addition, Cymer has committed to reduced gas usage, completing development in methods to reduce Helium gas usage while maintaining superior bandwidth and wavelength stability. The latest developments in lowering cost of operations are paired with our advanced ETC controller in Cymer's XLR 700ix product.

  6. Connected Vehicle Pilot Deployment Program phase 1 : comprehensive deployment plan : New York City : volume 1 : technical application : part I : technical and management approach.

    DOT National Transportation Integrated Search

    2016-08-01

    This document describes the Deployment Plan for the New York City Department of Transportation (NYC) Connected Vehicle Pilot Deployment (CVPD) Project. This plan describes the approach to complete Phase 2 Design/Build/Test, and Phase 3 Operate and Ma...

  7. Technology needs of advanced Earth observation spacecraft

    NASA Technical Reports Server (NTRS)

    Herbert, J. J.; Postuchow, J. R.; Schartel, W. A.

    1984-01-01

    Remote sensing missions were synthesized which could contribute significantly to the understanding of global environmental parameters. Instruments capable of sensing important land and sea parameters are combined with a large antenna designed to passively quantify surface emitted radiation at several wavelengths. A conceptual design for this large deployable antenna was developed. All subsystems required to make the antenna an autonomous spacecraft were conceptually designed. The entire package, including necessary orbit transfer propulsion, is folded to package within the Space Transportation System (STS) cargo bay. After separation, the antenna, its integral feed mast, radiometer receivers, power system, and other instruments are automatically deployed and transferred to the operational orbit. The design resulted in an antenna with a major antenna dimension of 120 meters, weighing 7650 kilograms, and operating at an altitude of 700 kilometers.

  8. Prospective assessment of chronic multisymptom illness reporting possibly associated with open-air burn pit smoke exposure in Iraq.

    PubMed

    Powell, Teresa M; Smith, Tyler C; Jacobson, Isabel G; Boyko, Edward J; Hooper, Tomoko I; Gackstetter, Gary D; Phillips, Christopher J; Smith, Besa

    2012-06-01

    To investigate the relationship between chronic multisymptom illness (CMI) and possible exposure to an open-air burn pit at three selected bases among those deployed to operations in Iraq and Afghanistan. Chronic multisymptom illness (reporting at least one symptom in at least two of the following symptom constructs: general fatigue; mood and cognition problems; and musculoskeletal discomfort) was assessed, differentiating by potential burn pit exposure, among deployers who completed 2004 and 2007 Millennium Cohort questionnaires. More than 21,000 Cohort participants were deployed in support of the current operations, including more than 3000 participants with at least one deployment within a 3-mile radius of a documented burn pit. After adjusting for covariates, no elevated risk of CMI was observed among those exposed. There was no increase in CMI symptom reporting in those deployed to three selected bases with documented burn pits compared with other deployers.

  9. Psychometric Analysis of the Servicemember Evaluation Tool

    DTIC Science & Technology

    to assess psychological resilience. The Naval Center for Combat and Operational Stress Control developed the Servicemember Evaluation Tool (SET) to...vessels on deployment. The goals of this thesis are to evaluate the psychometric properties of the SET on this sample population. Furthermore, this

  10. Guidelines for Evaluation of Ramp Signaling Deployments in a Real-Time Operations Environment

    DOT National Transportation Integrated Search

    2017-12-01

    State agencies have developed warrants and guidelines for the identification of on-ramps for metering. However, these warrants only consider recurrent traffic conditions in the vicinity of each on-ramp without considering the need to meter multiple r...

  11. Building professional capacity in ITS : assessment of ITS training and education needs : the transit perspective

    DOT National Transportation Integrated Search

    1999-04-01

    If there are to be successful deployments of new technologies by transit operators, the Federal Transit Administration (FTA) recognizes a great need exists for further professional development. This consists of enhancing the knowledge and skills base...

  12. 'Mass allergy': acute scombroid poisoning in a deployed Australian Defence Force health facility.

    PubMed

    Ward, David Ian

    2011-02-01

    On the last night of disaster relief operations in Sumatra, Indonesia, a mass casualty event occurred that involved deployed Australian Defence Force personnel. Symptoms of acute urticaria, angioedema, wheeze and gastrointestinal upset were experienced to varying degrees by 16% of the deployed element. The present report describes a presumed scombroid poisoning cluster and demonstrates the difficulties of operating in a deployed environment, the confusion that might be associated with evolving non-kinetic mass casualties, and provides a learning opportunity for an unusual mass casualty incident. © 2011 The Author. EMA © 2011 Australasian College for Emergency Medicine and Australasian Society for Emergency Medicine.

  13. Connected Vehicle Pilot Deployment Program phase 1 : security management operating concept : New York City : final report.

    DOT National Transportation Integrated Search

    2016-05-18

    This document describes the Security Management Operating Concept (SMOC) for the New York City Department of Transportation (NYCDOT) Connected Vehicle Pilot Deployment (CVPD) Project. This SMOC outlines the security mechanisms that will be used to pr...

  14. Cloud Onboarding with NGAP

    NASA Technical Reports Server (NTRS)

    Newman, Douglas

    2016-01-01

    Deployment of applications to the cloud, as opposed to on-premises, presents a number of new challenges to operations. Using an EOSDIS application deployed to NGAP as an example, we outline the commonality and differences you need to be aware of to successfully operate your application on the cloud.

  15. Exposure science in U.S. military operations: a review.

    PubMed

    Martin, Nicholas J; Richards, Erin E; Kirkpatrick, Jeffrey S

    2011-07-01

    Since 1991, the U.S. Department of Defense has conducted deployment occupational and environmental health surveillance activities in the geographic combatant commands for major conflicts, military exercises, and humanitarian and peace-building missions. The DoD has made significant improvements in documenting and assessing deployment environmental hazards and threats since 1991, illustrated by accomplishments in Bosnia, Kosovo, and Operations Noble Eagle (following the September 11, 2001 terrorist attacks); Enduring Freedom-Afghanistan; and Iraqi Freedom (2003-2010). Sampling is now recommended as part of the DoD Exposure Assessment Method, a dynamic process that is performed during all phases of military operations: I--Predeployment, II--Mobilization, III--Conflict, and IV-Postdeployment. From 2001 to 2009, deployed personnel collected over 24,500 air, water, soil, and bulk samples during operations. These efforts have lead to the creation of an environmental health surveillance database that has been used to investigate public health issues. However, gaps exist, especially in the assessment of individual exposures during deployment.

  16. Sustainable Telemedicine: Designing and Building Infrastructure to Support a Comprehensive Telemedicine Practice.

    PubMed

    Kreofsky, Beth L H; Blegen, R Nicole; Lokken, Troy G; Kapraun, Susan M; Bushman, Matthew S; Demaerschalk, Bart M

    2018-04-16

    Telemedicine services in medical institutions are often developed in isolation of one another and not as part of a comprehensive telemedicine program. The Center for Connected Care is the administrative home for a broad range of telehealth services at Mayo Clinic. This article speaks of real-time video services, referenced as telemedicine throughout. This article discusses how a large healthcare system designed and built the infrastructure to support a comprehensive telemedicine practice. Based on analysis of existing services, Mayo Clinic developed a multifaceted operational plan that addressed high-priority areas and outlined clear roles and responsibilities of the Center for Connected Care and that of the clinical departments. The plan set priorities and a direction that would lead to long-term success. The plan articulated the governing and operational infrastructure necessary to support telemedicine by defining the role of the Center for Connected Care as the owner of core administrative operations and the role of the clinical departments as the owners of clinical telemedicine services. Additional opportunities were identified to develop product selection processes, implementation services, and staffing models that would be applied to ensure successful telemedicine deployment. The telemedicine team within the Center for Connected Care completed 45 business cases resulting in 54 implementations. The standardization of core products along with key operational offerings around implementation services, and the establishment of a 24/7 support model resulted in improved provider satisfaction and fewer reported technical issues. The foundation for long-term scalability and growth was developed by centralizing operations of telemedicine services, implementing sustainable processes, employing dedicated qualified personnel, and deploying robust products.

  17. Impact of High Power Interference Sources in Planning and Deployment of Wireless Sensor Networks and Devices in the 2.4 GHz Frequency Band in Heterogeneous Environments

    PubMed Central

    Iturri, Peio López; Nazábal, Juan Antonio; Azpilicueta, Leire; Rodriguez, Pablo; Beruete, Miguel; Fernández-Valdivielso, Carlos; Falcone, Francisco

    2012-01-01

    In this work, the impact of radiofrequency radiation leakage from microwave ovens and its effect on 802.15.4 ZigBee-compliant wireless sensor networks operating in the 2.4 GHz Industrial Scientific Medical (ISM) band is analyzed. By means of a novel radioplanning approach, based on electromagnetic field simulation of a microwave oven and determination of equivalent radiation sources applied to an in-house developed 3D ray launching algorithm, estimation of the microwave oven's power leakage is obtained for the complete volume of an indoor scenario. The magnitude and the variable nature of the interference is analyzed and the impact in the radio link quality in operating wireless sensors is estimated and compared with radio channel measurements as well as packet measurements. The measurement results reveal the importance of selecting an adequate 802.15.4 channel, as well as the Wireless Sensor Network deployment strategy within this type of environment, in order to optimize energy consumption and increase the overall network performance. The proposed method enables one to estimate potential interference effects in devices operating within the 2.4 GHz band in the complete scenario, prior to wireless sensor network deployment, which can aid in achieving the most optimal network topology. PMID:23202228

  18. Adaptive Disclosure: A Combat-Specific PTSD Treatment

    DTIC Science & Technology

    2015-10-01

    operational stressors develop posttraumatic stress disorder ( PTSD ). Evidence-based interventions for treating PTSD , however, were not developed for military...experience deployment-related psychological health problems, such as posttraumatic stress disorder ( PTSD ; e.g., Hoge et al., 2004; see Litz & Schlenger...used to determine treatment efficacy. 15. SUBJECT TERMS Active-duty, Marine Corps, Posttraumatic stress disorder , Cognitive Therapy 16. SECURITY

  19. The seismotectonics of plate boundaries

    NASA Technical Reports Server (NTRS)

    Berger, J.; Brune, J. N.; Goodkind, J.; Wyatt, F.; Agnew, D. C.; Beaumont, C.

    1981-01-01

    Research on the seismotectonics of plate boundaries is summarized. Instrumental development and an observational program designed to study various aspects of the seismotectonics of southern California and the northern Gulf of California are described. A unique superconducting gravimeter was further developed and supported under this program for deployment and operation at several sites. Work on Earth tides is also discussed.

  20. The California All-sky Meteor Surveillance (CAMS) System

    NASA Astrophysics Data System (ADS)

    Gural, P. S.

    2011-01-01

    A unique next generation multi-camera, multi-site video meteor system is being developed and deployed in California to provide high accuracy orbits of simultaneously captured meteors. Included herein is a description of the goals, concept of operations, hardware, and software development progress. An appendix contains a meteor camera performance trade study made for video systems circa 2010.

  1. UAV Deployed Sensor System for Arctic Ocean Remote Sensing

    NASA Astrophysics Data System (ADS)

    Palo, S. E.; Lawrence, D.; Weibel, D.; LoDolce, G.; Krist, S.; Crocker, I.; Maslanik, J. A.

    2012-12-01

    The Marginal Ice Zone Observations and Processes Experiment (MIZOPEX), is an Arctic field project scheduled for summer 2013. The goals of the project are to understand how warming of the marginal ice zone affects sea ice melt and if this warming has been over or underestimated by satellite measurements. To achieve these goals calibrated physical measurements, both remote and in-situ, of the marginal ice zone over scales of square kilometers with a resolution of square meters is required. This will be accomplished with a suite of unmanned aerial vehicles (UAVs) equipped with both remote sensing and in-situ instruments, air deployed microbuoys, and ship deployed buoys. In this talk we will present details about the air-deployed micro-buoy (ADMB) and self-deployed surface-sonde (SDSS) components of the MIZOPEX project, developed at the University of Colorado. These systems were designed to explore the potential of low-cost, on-demand access to high-latitude areas of important scientific interest. Both the ADMB and SDSS share a common measurement suite with the capability to measure water temperature at three distinct depths and provide position information via GPS. The ADMBs are dropped from the InSitu ScanEagle UAV and expected to operate and log ocean temperatures for 14 days. The SDSS are micro UAVs that are designed to fly one-way to a region of interest and land at specified coordinates, thereafter becoming a surface sensor similar to the ADMB. A ScanEagle will periodically return to the deployment zone to gather ADMB/SDSS data via low power radio links. Design decisions based upon operational constraints and the current status of the ADMB and SDSS will be presented.

  2. Cascadia Initiative Ocean Bottom Seismograph Performance

    NASA Astrophysics Data System (ADS)

    Evers, B.; Aderhold, K.

    2017-12-01

    The Ocean Bottom Seismograph Instrument Pool (OBSIP) provided instrumentation and operations support for the Cascadia Initiative community experiment. This experiment investigated geophysical processes across the Cascadia subduction zone through a combination of onshore and offshore seismic data. The recovery of Year 4 instruments in September 2015 marked the conclusion of a multi-year experiment that utilized 60 ocean-bottom seismographs (OBSs) specifically designed for the subduction zone boundary, including shallow/deep water deployments and active fisheries. The new instruments featured trawl-resistant enclosures designed by Lamont-Doherty Earth Observatory (LDEO) and Scripps Institution of Oceanography (SIO) for shallow deployment [water depth ≤ 500 m], as well as new deep-water instruments designed by Woods Hole Oceanographic Institute (WHOI). Existing OBSIP instruments were also deployed along the Blanco Transform Fault and on the Gorda Plate through complementary experiments. Station instrumentation included weak and strong motion seismometers, differential pressure gauges (DPG) and absolute pressure gauges (APG). All data collected from the Cascadia, Blanco, and Gorda deployments is available through the Incorporated Research Institutions for Seismology (IRIS) Data Management Center (DMC). The Cascadia Initiative is the largest amphibious seismic experiment undertaken to date, encompassing a diverse technical implementation and demonstrating an effective structure for community experiments. Thus, the results from Cascadia serve as both a technical and operational resource for the development of future community experiments, such as might be contemplated as part of the SZ4D Initiative. To guide future efforts, we investigate and summarize the quality of the Cascadia OBS data using basic metrics such as instrument recovery and more advanced metrics such as noise characteristics through power spectral density analysis. We also use this broad and diverse deployment to explore other environmental and configuration factors that can impact sensor and network performance and inform the design of future deployments.

  3. STEP flight experiments Large Deployable Reflector (LDR) telescope

    NASA Technical Reports Server (NTRS)

    Runge, F. C.

    1984-01-01

    Flight testing plans for a large deployable infrared reflector telescope to be tested on a space platform are discussed. Subsystem parts, subassemblies, and whole assemblies are discussed. Assurance of operational deployability, rigidization, alignment, and serviceability will be sought.

  4. Task force St. Bernard: operational issues and medical management of a National Guard disaster response operation.

    PubMed

    Bonnett, Carl J; Schock, Tony R; McVaney, Kevin E; Colwell, Christopher B; Depass, Christopher

    2007-01-01

    After Hurricane Katrina struck the Gulf Coast of the United States on 29 August 2005, it became obvious that the country was facing an enormous national emergency. With local resources overwhelmed, governors across the US responded by deploying thousands of National Guard soldiers and airmen. The National Guard has responded to domestic disasters due to natural hazards since its inception, but an event with the magnitude of Hurricane Katrina was unprecedented. The deployment of >900 Army National Guard soldiers to St. Bernard Parish, Louisiana in the aftermath of the Hurricane was studied to present some of the operational issues involved with providing medical support for this type of operation. In doing so, the authors attempt to address some of the larger issues of how the National Guard can be incorporated into domestic disaster response efforts. A number of unforeseen issues with regards to medical operations, medical supply, communication, preventive medicine, legal issues, and interactions with civilians were encountered and are reviewed. A better understanding of the National Guard and how it can be utilized more effectively in future disaster response operations can be developed.

  5. Evaluation of Deployment Challenges of Wireless Sensor Networks at Signalized Intersections

    PubMed Central

    Azpilicueta, Leyre; López-Iturri, Peio; Aguirre, Erik; Martínez, Carlos; Astrain, José Javier; Villadangos, Jesús; Falcone, Francisco

    2016-01-01

    With the growing demand of Intelligent Transportation Systems (ITS) for safer and more efficient transportation, research on and development of such vehicular communication systems have increased considerably in the last years. The use of wireless networks in vehicular environments has grown exponentially. However, it is highly important to analyze radio propagation prior to the deployment of a wireless sensor network in such complex scenarios. In this work, the radio wave characterization for ISM 2.4 GHz and 5 GHz Wireless Sensor Networks (WSNs) deployed taking advantage of the existence of traffic light infrastructure has been assessed. By means of an in-house developed 3D ray launching algorithm, the impact of topology as well as urban morphology of the environment has been analyzed, emulating the realistic operation in the framework of the scenario. The complexity of the scenario, which is an intersection city area with traffic lights, vehicles, people, buildings, vegetation and urban environment, makes necessary the channel characterization with accurate models before the deployment of wireless networks. A measurement campaign has been conducted emulating the interaction of the system, in the vicinity of pedestrians as well as nearby vehicles. A real time interactive application has been developed and tested in order to visualize and monitor traffic as well as pedestrian user location and behavior. Results show that the use of deterministic tools in WSN deployment can aid in providing optimal layouts in terms of coverage, capacity and energy efficiency of the network. PMID:27455270

  6. Evaluation of Deployment Challenges of Wireless Sensor Networks at Signalized Intersections.

    PubMed

    Azpilicueta, Leyre; López-Iturri, Peio; Aguirre, Erik; Martínez, Carlos; Astrain, José Javier; Villadangos, Jesús; Falcone, Francisco

    2016-07-22

    With the growing demand of Intelligent Transportation Systems (ITS) for safer and more efficient transportation, research on and development of such vehicular communication systems have increased considerably in the last years. The use of wireless networks in vehicular environments has grown exponentially. However, it is highly important to analyze radio propagation prior to the deployment of a wireless sensor network in such complex scenarios. In this work, the radio wave characterization for ISM 2.4 GHz and 5 GHz Wireless Sensor Networks (WSNs) deployed taking advantage of the existence of traffic light infrastructure has been assessed. By means of an in-house developed 3D ray launching algorithm, the impact of topology as well as urban morphology of the environment has been analyzed, emulating the realistic operation in the framework of the scenario. The complexity of the scenario, which is an intersection city area with traffic lights, vehicles, people, buildings, vegetation and urban environment, makes necessary the channel characterization with accurate models before the deployment of wireless networks. A measurement campaign has been conducted emulating the interaction of the system, in the vicinity of pedestrians as well as nearby vehicles. A real time interactive application has been developed and tested in order to visualize and monitor traffic as well as pedestrian user location and behavior. Results show that the use of deterministic tools in WSN deployment can aid in providing optimal layouts in terms of coverage, capacity and energy efficiency of the network.

  7. Development of a Field-Deployable Psychomotor Vigilance Test to Monitor Helicopter Pilot Performance.

    PubMed

    McMahon, Terry W; Newman, David G

    2016-04-01

    Flying a helicopter is a complex psychomotor skill. Fatigue is a serious threat to operational safety, particularly for sustained helicopter operations involving high levels of cognitive information processing and sustained time on task. As part of ongoing research into this issue, the object of this study was to develop a field-deployable helicopter-specific psychomotor vigilance test (PVT) for the purpose of daily performance monitoring of pilots. The PVT consists of a laptop computer, a hand-operated joystick, and a set of rudder pedals. Screen-based compensatory tracking task software includes a tracking ball (operated by the joystick) which moves randomly in all directions, and a second tracking ball which moves horizontally (operated by the rudder pedals). The 5-min test requires the pilot to keep both tracking balls centered. This helicopter-specific PVT's portability and integrated data acquisition and storage system enables daily field monitoring of the performance of individual helicopter pilots. The inclusion of a simultaneous foot-operated tracking task ensures divided attention for helicopter pilots as the movement of both tracking balls requires simultaneous inputs. This PVT is quick, economical, easy to use, and specific to the operational flying task. It can be used for performance monitoring purposes, and as a general research tool for investigating the psychomotor demands of helicopter operations. While reliability and validity testing is warranted, data acquired from this test could help further our understanding of the effect of various factors (such as fatigue) on helicopter pilot performance, with the potential of contributing to helicopter operational safety.

  8. Family adjustment of deployed and non-deployed mothers in families with a parent deployed to Iraq or Afghanistan

    PubMed Central

    Gewirtz, Abigail H.; McMorris, Barbara J.; Hanson, Sheila; Davis, Laurel

    2014-01-01

    Almost nothing is known about the family and individual adjustment of military mothers who have deployed to the conflicts in Iraq or Afghanistan (Operations Iraqi and Enduring Freedom, and Operation New Dawn; OIF, OEF, OND), constituting a gap in psychologists’ knowledge about how best to help this population. We report baseline data on maternal, child, parenting, and couple adjustment for mothers in 181 families in which a parent deployed to OIF/OEF/OND. Among this sample, 34 mothers had deployed at least once, and 147 mothers had experienced the deployment of a male spouse/partner. Mothers completed self-report questionnaires assessing past year adverse life events, war experiences (for deployed mothers only), posttraumatic stress disorder (PTSD) and depression symptoms, difficulties in emotion regulation, parenting, couple adjustment, and child functioning. Mothers who had deployed reported greater distress than non-deployed mothers (higher scores on measures of PTSD and depression symptoms), and slightly more past year adverse events. A moderate number of war experiences (combat and post-battle aftermath events) were reported, consistent with previous studies of women in current and prior conflicts. However, no differences were found between the two groups on measures of couple adjustment, parenting, or child functioning. Results are discussed in terms of the dearth of knowledge about deployed mothers, and implications for psychologists serving military families. PMID:25663739

  9. Work stressors, depressive symptoms and sleep quality among US Navy members: a parallel process latent growth modelling approach across deployment.

    PubMed

    Bravo, Adrian J; Kelley, Michelle L; Swinkels, Cindy M; Ulmer, Christi S

    2017-11-03

    The present study examined whether work stressors contribute to sleep problems and depressive symptoms over the course of deployment (i.e. pre-deployment, post-deployment and 6-month reintegration) among US Navy members. Specifically, we examined whether depressive symptoms or sleep quality mediate the relationships between work stressors and these outcomes. Participants were 101 US Navy members who experienced an 8-month deployment after Operational Enduring Freedom/Operation Iraqi Freedom. Using piecewise latent growth models, we found that increased work stressors were linked to increased depressive symptoms and decreased sleep quality across all three deployment stages. Further, increases in work stressors from pre- to post-deployment contributed to poorer sleep quality post-deployment via increasing depressive symptoms. Moreover, sleep quality mediated the association between increases in work stressors and increases in depressive symptoms from pre- to post-deployment. These effects were maintained from post-deployment through the 6-month reintegration. Although preliminary, our results suggest that changes in work stressors may have small, but significant implications for both depressive symptoms and quality of sleep over time, and a bi-directional relationship persists between sleep quality and depression across deployment. Strategies that target both stress and sleep could address both precipitating and perpetuating factors that affect sleep and depressive symptoms. © 2017 European Sleep Research Society.

  10. Design and development of a severe storm research UAS

    NASA Astrophysics Data System (ADS)

    Avery, Alyssa Shearon

    A small unmanned aircraft system (SUAS) was designed and developed to be utilized for meteorological data collection, specifically information useful for severe storm and tornado prediction. The system will operate prior to and during severe weather in order to minimize current knowledge gaps with respect to severe storms. This aircraft was developed to maximize the useful data collection while retaining the operational simplicity required of a tool used in an unpredictable environment. The aircraft design is capable of collecting in-situ atmospheric and IR thermodynamic data continuously in flight and deploying sensor packages, dropsondes, at vital locations. The airframe was built, has undergone initial testing, and will be integrated into an operational system in future work.

  11. Reported stressors and health care needs of active duty Navy personnel during three phases of deployment in support of the war in Iraq.

    PubMed

    McNulty, Peggy Anne Fisher

    2005-06-01

    Literature has generously documented the stress of military members and their families during deployments in noncombat periods. Deployment has been shown to increase the needs of family members for health care, both physical and psychological. The purpose of this study was to describe the health care needs and perceived stressors of active duty members deployed to Iraq during the predeployment, mid-deployment, and postdeployment phases. Active duty Navy service members deployed on three aircraft carriers during Operation Enduring Freedom and Operation Iraqi Freedom in 2002-2003 were randomly selected to participate in an anonymous study that evaluated member well-being, adaptation, coping, anxiety, stress, and health care needs during three phases of deployment. Data were obtained from 474 Navy members in predeployment, 445 in mid-deployment, and 276 in postdeployment. Logistic regression analyses indicated that many variables predicted extreme anxiety during deployment, including mid-deployment phase, age of under 25 years, being childless, nonattendance at church, being enlisted, zero- or one-deployment history; no high school education, and being currently in counseling. Active duty members in all phases of deployment had equally disturbing levels of anxiety. All phases reported suicidal ideation at alarming rates (2.4% in predeployment, 4.9% in mid-deployment, and 3% in postdeployment). This study sheds new light on the stressors and subsequent health care needs of active duty members on carriers during war and provides valuable information for the prevention of high-risk anxieties and subsequent health risks for all service members during similar deployments.

  12. Fostering Development, Evaluation, And Deployment Of Forward Crash Avoidance Systems (Focas), Final Report

    DOT National Transportation Integrated Search

    1995-05-15

    THE OBJECTIVE AND SUBJECTIVE RESULTS OBTAINED THIS YEAR ARE FROM A POPULATION OF 36 DRIVER-PARTICIPANTS THAT WAS BALANCED FOR GENDER, AGE, AND EXPERIENCE WITH CRUISE CONTROL. THESE RESULTS INDICATE THAT THE BASELINE SYSTEM OPERATES WELL ON U.S. FREEW...

  13. California ATMS Testbed : PHASE III: Operational Research Implementation : Final Report [Volume 1: Executive Summary ; and, Volume II: Technical Report

    DOT National Transportation Integrated Search

    2006-10-01

    This report summarizes research and development that has been conducted to position the Testbed to support prototype deployment and evaluation of Advanced Transportation Management Systems (ATMS) products and services. The various elements contained ...

  14. Operational implications and proposed infrastructure changes for NAS integration of remotely piloted aircraft (RPA)

    DOT National Transportation Integrated Search

    2014-12-01

    The intent of this report is to provide (1) an initial assessment of National Airspace System (NAS) infrastructure affected by continuing development and deployment of unmanned aircraft systems into the NAS, and (2) a description of process challenge...

  15. ENVIRONMENTAL TECHNOLOGY VERIFICATION REPORT: AISIN SEIKI 6.0 KW NATURAL-GAS-FIRED ENGINE COGENERATION UNIT

    EPA Science Inventory

    The U.S. EPA's Office of Research and Development operates the Environmental Technology Verification (ETV) program to facilitate the deployment of innovative technologies through performance verification and information dissemination. Congress funds ETV in response to the belief ...

  16. A Hand-in-Hand Approach for Security and Development in Sub-Saharan Africa

    DTIC Science & Technology

    2010-06-15

    peacekeeping operations and large contingents deployed in Democratic Republic of the Congo (DRC), the Darfur region of Sudan, Lebanon , Liberia...several SSA countries improve their ability to investigate, prosecute, and adjudicate gender -based violence and provide support to victims. 19

  17. ITS Early Deployment Study, Richmond/ Tri-Cities Area, User Service Plan

    DOT National Transportation Integrated Search

    1996-05-01

    ">THE ESSENCE OF THE ITS PLANNING PROCESS IS TO DEVELOP EACH ITS PROGRAM ON THE BASIS OF THE NEEDS OF THE USERS AND OPERATORS OF THE TRANSPORTATION FACILITIES. ALTHOUGH THE PROCESS IS THE SAME NATIONWIDE, THE RESULTS ARE CUSTOMIZED IN EACH COMMUNITY ...

  18. First year of ALMA site software deployment: where everything comes together

    NASA Astrophysics Data System (ADS)

    González, Víctor; Mora, Matias; Araya, Rodrigo; Arredondo, Diego; Bartsch, Marcelo; Burgos, Pablo; Ibsen, Jorge; Reveco, Johnny; Sáez, Norman; Schemrl, Anton; Sepulveda, Jorge; Shen, Tzu-Chiang; Soto, Rubén; Troncoso, Nicolás; Zambrano, Mauricio; Barriga, Nicolás; Glendenning, Brian; Raffi, Gianni; Kern, Jeff

    2010-07-01

    Starting 2009, the ALMA project initiated one of its most exciting phases within construction: the first antenna from one of the vendors was delivered to the Assembly, Integration and Verification team. With this milestone and the closure of the ALMA Test Facility in New Mexico, the JAO Computing Group in Chile found itself in the front line of the project's software deployment and integration effort. Among the group's main responsibilities are the deployment, configuration and support of the observation systems, in addition to infrastructure administration, all of which needs to be done in close coordination with the development groups in Europe, North America and Japan. Software support has been the primary interaction key with the current users (mainly scientists, operators and hardware engineers), as the software is normally the most visible part of the system. During this first year of work with the production hardware, three consecutive software releases have been deployed and commissioned. Also, the first three antennas have been moved to the Array Operations Site, at 5.000 meters elevation, and the complete end-to-end system has been successfully tested. This paper shares the experience of this 15-people group as part of the construction team at the ALMA site, and working together with Computing IPT, on the achievements and problems overcomed during this period. It explores the excellent results of teamwork, and also some of the troubles that such a complex and geographically distributed project can run into. Finally, it approaches the challenges still to come, with the transition to the ALMA operations plan.

  19. A Cabled Acoustic Telemetry System for Detecting and Tracking Juvenile Salmon: Part 1. Engineering Design and Instrumentation

    PubMed Central

    Weiland, Mark A.; Deng, Z. Daniel; Seim, Tom A.; LaMarche, Brian L.; Choi, Eric Y.; Fu, Tao; Carlson, Thomas J.; Thronas, Aaron I.; Eppard, M. Brad

    2011-01-01

    In 2001 the U.S. Army Corps of Engineers, Portland District (OR, USA), started developing the Juvenile Salmon Acoustic Telemetry System, a nonproprietary sensing technology, to meet the needs for monitoring the survival of juvenile salmonids through eight large hydroelectric facilities within the Federal Columbia River Power System (FCRPS). Initial development focused on coded acoustic microtransmitters and autonomous receivers that could be deployed in open reaches of the river for detection of the juvenile salmonids implanted with microtransmitters as they passed the autonomous receiver arrays. In 2006, the Pacific Northwest National Laboratory began the development of an acoustic receiver system for deployment at hydropower facilities (cabled receiver) for detecting fish tagged with microtransmitters as well as tracking them in two or three dimensions for determining route of passage and behavior as the fish passed at the facility. The additional information on route of passage, combined with survival estimates, is used by the dam operators and managers to make structural and operational changes at the hydropower facilities to improve survival of fish as they pass the facilities through the FCRPS. PMID:22163918

  20. OBSIP: Advancing Capabilities and Expanding the Ocean Bottom Seismology Community

    NASA Astrophysics Data System (ADS)

    Aderhold, K.; Evers, B.

    2016-12-01

    The Ocean Bottom Seismograph Instrument Pool (OBSIP) is a National Science Foundation sponsored instrument facility that provides ocean bottom seismometers (OBS) and technical support for research in the areas of marine geology, seismology, and geodynamics. OBSIP is comprised of an OBSIP Management Office (OMO) and three Institutional Instrument Contributors (IICs), who each contribute instruments and technical support to the pool. OBSIP operates both short period and broadband OBS instruments with a variety of capabilities to operate in shallow or deep water over both short and long term durations. Engineering developments at the IICs include capability for freshwater deployments, increased recording duration (15+ months), more efficient recovery systems, and sensor upgrades for a less heterogeneous fleet. OBSIP will provide instruments for three experiments in 2016 with deployments along a 1500 km transect in the South Atlantic, a large active-source experiment on the Chilean megathrust, and the very first seismometers ever deployed in Yellowstone Lake. OBSIP OMO strives to lower the barrier to working with OBS data by performing quality checks on data, investigating and responding to community questions, and providing data products like horizontal orientation calculations. This has resulted in a significant increase in new users to OBS data, especially for the open data sets from community seismic experiments. In 2015 the five-year Cascadia Initiative community seismic experiment concluded with over 250 OBS deployments and recoveries in an extensive grid off-shore Washington, Oregon, and California. The logistics of the Cascadia Initiative were challenging, but lessons were learned and efficiencies have been identified for implementation in future experiments. Large-scale community seismic experiments that cross the shoreline like the Cascadia Initiative and the Eastern North American Margin experiment have led to the proposal of even more ambitious endeavors like the Subduction Zone Observatory. OBSIP also is working to develop international collaboration and networking between OBS operators and researchers through special interest group meetings and the biannual OBS Symposium, to be held again in Fall 2017.

  1. Surface Telerobotics: Development and Testing of a Crew Controlled Planetary Rover System

    NASA Technical Reports Server (NTRS)

    Fong, Terry; Bualat, Maria; Allan, Mark B; Bouyssounouse, Xavier; Cohen, Tamar

    2013-01-01

    During Summer 2013, we conducted a series of tests to examine how astronauts in the In- ternational Space Station (ISS) can remotely operate a planetary rover. The tests simulated portions of a proposed mission, in which an astronaut in lunar orbit remotely operates a planetary rover to deploy a radio telescope on the lunar farside. In this paper, we present the design, implementation, and preliminary test results.

  2. Research in Observations of Oceanic Air/Sea Interaction

    NASA Technical Reports Server (NTRS)

    Long, David G.; Arnold, David V.

    1995-01-01

    The primary purpose of this research has been: (1) to develop an innovative research radar scatterometer system capable of directly measuring both the radar backscatter and the small-scale and large-scale ocean wave field simultaneously and (2) deploy this instrument to collect data to support studies of air/sea interaction. The instrument has been successfully completed and deployed. The system deployment lasted for six months during 1995. Results to date suggest that the data is remarkably useful in air/sea interaction studies. While the data analysis is continuing, two journal and fifteen conference papers have been published. Six papers are currently in review with two additional journal papers scheduled for publication. Three Master's theses on this research have been completed. A Ph.D. student is currently finalizing his dissertation which should be completed by the end of the calendar year. We have received additional 'mainstream' funding from the NASA oceans branch to continue data analysis and instrument operations. We are actively pursuing results from the data expect additional publications to follow. This final report briefly describes the instrument system we developed and results to-date from the deployment. Additional detail is contained in the attached papers selected from the bibliography.

  3. Development and Test of an Infrastructure Free Real-Time Water Level Measurement System

    NASA Astrophysics Data System (ADS)

    Breuer, E. R.; Heitsenrether, R.; Hensley, W., III; Krug, W.; Wolcott, D.

    2016-02-01

    NOAA's Center for Operational Oceanographic Products and Services (CO-OPS) is responsible for developing and maintaining the National Water Level Observation Network (NWLON). NWLON consists of over 200 long term observatories that provide near real-time, 6 minute average, water level observations from locations throughout all U.S. coasts. CO-OPS continually analyzes state-of-the-art and emerging technologies to identify potential improvements in data quality and operating efficiency. NOAA, recognizing the changing conditions, anticipates a critical need for real time oceanographic and meteorological observations where traditional approaches are less feasible. CO-OPS is working on the design, development and testing of a real-time tidal measurement system, "The Hermit," for use in coastal regions. The latest prototype has recently completed a successful 3 month field test deployment in the St Andrews Sound region of Georgia, a location where relatively few long term water level records have been collected to date. The test location provided unique challenges such as having a very limited coastal infrastructure and experiencing a 7-8 foot tidal range. The Hermit consists of a bottom mounted pressure/conductivity/temperature sensor (Seabird SBE 26+) and a surface communications buoy which are linked via acoustic modems (Link Quest). The surface buoy relays data back to the CO-OPS database in near-real time using an Iridium satellite based communication system. Additionally, the buoy includes an AirMar all-in-one meteorological sensor. In addition to The Hermit deployment, three test GPS bench marks and a tide staff were installed on a nearby coastline to vertically reference water level measurements. During this deployment, The Hermit successfully provided near real-time measurements of bottom pressure, water conductivity and temperature, wind speed and direction, air temperature, and barometric pressure over the 3 month deployment. During the test period, several high wind storm surge events were captured, along with a perigean spring tide. Details of these data along with the system design will be presented along with CO-OPS plans for future operational applications.

  4. Deployment cycle stressors and post-traumatic stress symptoms in Army National Guard women: the mediating effect of resilience.

    PubMed

    Wooten, Nikki R

    2012-01-01

    This study examined the associations between deployment cycle stressors, post-traumatic stress symptoms (PTSS), and resilience in Army National Guard (ARNG) women deployed to Operations Enduring Freedom and Iraqi Freedom. Resilience was also tested as a mediator. Hierarchical linear regression indicated that deployment and post-deployment stressors were positively associated, and resilience was negatively associated with PTSS. Resilience fully mediated the association between post-deployment stressors and PTSS. Findings suggest assessing deployment and post-deployment stressors in ARNG women may be helpful in identifying those at risk for severe PTSS; and highlight the potential of individual-level resilient characteristics in mitigating the adverse impact of post-deployment stressors.

  5. 77 FR 30518 - Support of Deployment of Prototype Small Modular Reactors at the Savannah River Site

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-23

    ... DEPARTMENT OF ENERGY Support of Deployment of Prototype Small Modular Reactors at the Savannah River Site AGENCY: Savannah River Operations Office, Department of Energy (DOE). ACTION: Notice of availability. SUMMARY: DOE-Savannah River Operations Office (SR), in conjunction with the Savannah River...

  6. Quick wins connected vehicles deployment scenario : a grassroots approach to safer roads, greater mobility, and cleaner air.

    DOT National Transportation Integrated Search

    2011-01-01

    The Quick Wins Connected Vehicles deployment scenario provides stakeholders from planners, to operators, to manufacturers, to policymakers with a defensible path towards the deployment of Connected Vehicles technologies over the next half-dec...

  7. Data-Driven Simulation-Enhanced Optimization of People-Based Print Production Service

    NASA Astrophysics Data System (ADS)

    Rai, Sudhendu

    This paper describes a systematic six-step data-driven simulation-based methodology for optimizing people-based service systems on a large distributed scale that exhibit high variety and variability. The methodology is exemplified through its application within the printing services industry where it has been successfully deployed by Xerox Corporation across small, mid-sized and large print shops generating over 250 million in profits across the customer value chain. Each step of the methodology consisting of innovative concepts co-development and testing in partnership with customers, development of software and hardware tools to implement the innovative concepts, establishment of work-process and practices for customer-engagement and service implementation, creation of training and infrastructure for large scale deployment, integration of the innovative offering within the framework of existing corporate offerings and lastly the monitoring and deployment of the financial and operational metrics for estimating the return-on-investment and the continual renewal of the offering are described in detail.

  8. Robust telerobotics - an integrated system for waste handling, characterization and sorting

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Couture, S.A.; Hurd, R.L.; Wilhelmsen, K.C.

    The Mixed Waste Management Facility (MWMF) at the Lawrence Livermore National Laboratory was designed to serve as a national testbed to demonstrate integrated technologies for the treatment of low-level organic mixed waste at a pilot-plant scale. Pilot-scale demonstration serves to bridge the gap between mature, bench-scale proven technologies and full-scale treatment facilities by providing the infrastructure needed to evaluate technologies in an integrated, front-end to back-end facility. Consistent with the intent to focus on technologies that are ready for pilot scale deployment, the front-end handling and feed preparation of incoming waste material has been designed to demonstrate the application ofmore » emerging robotic and remotely operated handling systems. The selection of telerobotics for remote handling in MWMF was made based on a number of factors - personnel protection, waste generation, maturity, cost, flexibility and extendibility. Telerobotics, or shared control of a manipulator by an operator and a computer, provides the flexibility needed to vary the amount of automation or operator intervention according to task complexity. As part of the telerobotics design effort, the technical risk of deploying the technology was reduced through focused developments and demonstrations. The work involved integrating key tools (1) to make a robust telerobotic system that operates at speeds and reliability levels acceptable to waste handling operators and, (2) to demonstrate an efficient operator interface that minimizes the amount of special training and skills needed by the operator. This paper describes the design and operation of the prototype telerobotic waste handling and sorting system that was developed for MWMF.« less

  9. Risk of adverse health outcomes associated with frequency and duration of deployment with the Australian Defence Force.

    PubMed

    Bleier, Jonathan; McFarlane, Alexander; McGuire, Annabel; Treloar, Susan; Waller, Michael; Dobson, Annette

    2011-02-01

    The operational tempo of the Australian Defence Force has increased over the last two decades. We examine the relationship between health of personnel and the frequency and duration of their deployment. Self-reported health measures (number of symptoms, Kessler Psychological Distress Scale, and Post Traumatic Stress Disorder Checklist) were compared for people who had never deployed to those who had deployed only once and for those who had deployed at least twice with at least one deployment to East Timor and one deployment to Afghanistan or Iraq. Comparisons were also made between people who had deployed for at least one month and those who had deployed for longer periods. Frequency of deployment but not duration of deployment was associated with poorer health.

  10. Performance of full-sib families of Douglas-fir in pure-family and mixed-family deployments

    Treesearch

    Peter J. Gould; J. Bradley St.Clair; Paul D. Anderson

    2011-01-01

    A major objective of tree improvement programs is to identify genotypes that will perform well in operational deployments. Relatively little is known, however, about how the competitive environment affects performance in different types of deployments. We tested whether the genetic composition and density of deployments affect the performance of full-sib families of...

  11. Tier-scalable reconnaissance: the future in autonomous C4ISR systems has arrived: progress towards an outdoor testbed

    NASA Astrophysics Data System (ADS)

    Fink, Wolfgang; Brooks, Alexander J.-W.; Tarbell, Mark A.; Dohm, James M.

    2017-05-01

    Autonomous reconnaissance missions are called for in extreme environments, as well as in potentially hazardous (e.g., the theatre, disaster-stricken areas, etc.) or inaccessible operational areas (e.g., planetary surfaces, space). Such future missions will require increasing degrees of operational autonomy, especially when following up on transient events. Operational autonomy encompasses: (1) Automatic characterization of operational areas from different vantages (i.e., spaceborne, airborne, surface, subsurface); (2) automatic sensor deployment and data gathering; (3) automatic feature extraction including anomaly detection and region-of-interest identification; (4) automatic target prediction and prioritization; (5) and subsequent automatic (re-)deployment and navigation of robotic agents. This paper reports on progress towards several aspects of autonomous C4ISR systems, including: Caltech-patented and NASA award-winning multi-tiered mission paradigm, robotic platform development (air, ground, water-based), robotic behavior motifs as the building blocks for autonomous tele-commanding, and autonomous decision making based on a Caltech-patented framework comprising sensor-data-fusion (feature-vectors), anomaly detection (clustering and principal component analysis), and target prioritization (hypothetical probing).

  12. Child maltreatment among U.S. Air Force parents deployed in support of Operation Iraqi Freedom/Operation Enduring Freedom.

    PubMed

    Rabenhorst, Mandy M; McCarthy, Randy J; Thomsen, Cynthia J; Milner, Joel S; Travis, Wendy J; Colasanti, Marie P

    2015-02-01

    This study examined child maltreatment perpetration among 99,697 active-duty U.S. Air Force parents who completed a combat deployment. Using the deploying parent as the unit of analysis, we analyzed whether child maltreatment rates increased postdeployement relative to predeployment. These analyses extend previous research that used aggregate data and extend our previous work that used data from the same period but used the victim as the unit of analysis and included only deploying parents who engaged in child maltreatment. In this study, 2% (n = 1,746) of deploying parents perpetrated child maltreatment during the study period. Although no overall differences were found in child maltreatment rates postdeployment compared to predeployment, several maltreatment-related characteristics qualified this finding. Rates for emotional abuse and mild maltreatment were lower following deployment, whereas child maltreatment rates for severe maltreatment were higher following deployment. The finding that rates of severe child maltreatment, including incidents involving alcohol use, were higher postdeployment suggests a need for additional support services for parents following their return from combat deployment, with a focus on returning parents who have an alcohol use problem. © The Author(s) 2014.

  13. Japanese style total quality control: A first hand experience

    NASA Astrophysics Data System (ADS)

    Cook, S. C.

    1991-11-01

    The scope, concepts and practices of Total Quality Control (TQC) as operated in Japan today are described. The following mechanisms and elements are introduced: policy deployment, cross functional management, small group activities, suggestion systems, standardization, the TQC promotion department, and TQC education. It is shown on a practical level, how TQC operates in the research and engineering divisions of the aeroengine and space operation at Ishikawajima Harima Industries in Japan. Japanese style TQC is a well developed, well promoted, well structured, common approach to achieving customer satisfaction through continuous improvements. Furthermore, TQC itself is being continuously improved with the Japanese still refining, extending, and developing TQC.

  14. Deployment of Wind Turbines in the Built Environment: Risks, Lessons, and Recommended Practices

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Baring-Gould, Ian; Fields, Jason; Oteri, Frank

    Built-environment wind turbine (BEWT) projects are wind energy projects that are constructed on, in, or near buildings, as shown below. These projects present an opportunity for distributed, low-carbon generation combined with highly visible statements on sustainability, but the BEWT niche of the wind industry is still developing and is relatively less mature than the utility-scale wind or conventional ground-based distributed wind sectors. This poster investigates the current state of the BEWT industry by reviewing available literature on BEWT projects as well as interviewing project owners on their experiences deploying and operating the technology.

  15. The deployment of information systems and information technology in field hospitals.

    PubMed

    Crowe, Ian R J; Naguib, Raouf N G

    2010-01-01

    Information systems and related technologies continue to develop and have become an integral part of healthcare provision and hospital care in particular. Field hospitals typically operate in the most austere and difficult of conditions and have yet to fully exploit related technologies. This paper addresses those aspects of healthcare informatics, healthcare knowledge management and lean healthcare that can be applied to field hospitals, with a view to improving patient care. The aim is to provide a vision for the deployment of information systems and information technology in field hospitals, using the British Army's field hospital as a representative model.

  16. CubeSat Deployment Photos

    NASA Image and Video Library

    2016-09-14

    View taken by the Expedition 49 crew of track of first of four pairs of Planet Lab DoveSats over the Earth. This deployment titled “Flock 2” is a fleet of nanosatellites designed, built and operated by Planet Labs Inc., and will enable imagery of the changing planet to be taken on a frequent basis, with humanitarian and environmental applications ranging from monitoring deforestation and the ice caps to disaster relief and improving agriculture yields in developing nations. Image used as part of Twitter message - We launched two satellites from @Space_Station today – like skydivers soaring towards the earth." #AstroKate.

  17. VHF Broadband Digital Interferometer for Real-time Operation

    NASA Astrophysics Data System (ADS)

    Kawasaki, Z. I.; Morimoto, T.; Akita, M.; Nakamura, Y.; Ushio, T.

    2008-12-01

    Lightning Research Group of Osaka University (LRG-OU) has been developing a VHF lightning mapper, Broadband Digital Interferometer (BDITF), to investigate lightning initiation and progression since 1995. When LRG-OU started the project, a multichannel digital storage oscilloscope was deployed to record VHF waveforms emitted by lightning discharges. VHF broadband antenna and necessary electronics like an amplifier were redesigned. Original VHF BDITF was operated in a rocket-triggered lightning experiment during winter thunderstorm season in Hokuriku, Japan. The first observation by BDITF was a rocket-triggered lightning, which lowered the positive charge to the ground. That meant ascending negative breakdown propagation was recorded, and LRG-OU obtained the lightning channel image by upward triggered lightning. Since LRGOU could validate the function and capability of BDITF through several field campaigns, a project to design and manufacture a special analog to digital converter for BDITF was initiated in 1998. Moreover software for a real-time data processing was developed. The first system of new BDITF was operated during a filed campaign in 2003, and lightning channels in two dimensions (2D), which meant azimuth and elevation format, were able to be reconstructed in a several seconds after occurrence of lightning flash. The BDITF system was considered to be an operational system recently. For three dimensional (3D) imaging, two sites operation of BDITF and post data processing of the triangulation are required. LRG-OU learned the bi- directional leader progression, possible charge distribution related to the leader initiation, and the speed of the leader propagation by the 3D imaging. The achievement of BDITF technique by LRG-OU gives us the chance of deployment and operation of the system around the rocket launching site of JAXA on the Tanegashima island. This operation is expected to contribute the go/no-go judgment of rocket launching by JAXA because of the now casting the location of lightning discharges. LRG-OU also joins in the several satellite projects. BDITF system which can be deployed on the satellite and/or space station is manufactured. The first VHF system is expected to be in the space in early 2009.

  18. Utilization of Internet Protocol-Based Voice Systems in Remote Payload Operations

    NASA Technical Reports Server (NTRS)

    Chamberlain, jim; Bradford, Bob; Best, Susan; Nichols, Kelvin

    2002-01-01

    Due to limited crew availability to support science and the large number of experiments to be operated simultaneously, telescience is key to a successful International Space Station (ISS) science program. Crew, operations personnel at NASA centers, and researchers at universities and companies around the world must work closely together to per orm scientific experiments on-board ISS. The deployment of reliable high-speed Internet Protocol (IP)-based networks promises to greatly enhance telescience capabilities. These networks are now being used to cost-effectively extend the reach of remote mission support systems. They reduce the need for dedicated leased lines and travel while improving distributed workgroup collaboration capabilities. NASA has initiated use of Voice over Internet Protocol (VoIP) to supplement the existing mission voice communications system used by researchers at their remote sites. The Internet Voice Distribution System (IVoDS) connects remote researchers to mission support "loopsll or conferences via NASA networks and Internet 2. Researchers use NODS software on personal computers to talk with operations personnel at NASA centers. IVoDS also has the ;capability, if authorized, to allow researchers to communicate with the ISS crew during experiment operations. NODS was developed by Marshall Space Flight Center with contractors & Technology, First Virtual Communications, Lockheed-Martin, and VoIP Group. NODS is currently undergoing field-testing with full deployment for up to 50 simultaneous users expected in 2002. Research is being performed in parallel with IVoDS deployment for a next-generation system to qualitatively enhance communications among ISS operations personnel. In addition to the current voice capability, video and data/application-sharing capabilities are being investigated. IVoDS technology is also being considered for mission support systems for programs such as Space Launch Initiative and Homeland Defense.

  19. U.S. Army Reserve (Medical) soldier prescription challenges during Operation Iraqi Freedom.

    PubMed

    Savitala, Murty; Dydek, George J

    2004-12-01

    The continuous requirement to mobilize and deploy reserve soldiers presents numerous challenges for the Army Medical Department. One of the challenges in the preparation for deployment of reserve soldiers is the assessment of chronic prescription medication requirements and the eventual filling of these requirements during deployment. The assigned unit pharmacy officer can provide a value-added service through the identification and coordination of the pharmaceutical needs of an activated deploying unit. A unit pharmacy officer conducted a prescription medication use analysis on an activated Army Reserve Medical Unit before deployment in support of Operation Iraqi Freedom. The study population consisted of 181 soldiers identified through a volunteer survey administered by the assigned pharmacy officer. The prescription medication requirements for the unit were identified in a predeployment status and an evaluation was conducted to determine the ability to sustain the medication requirements once the unit was to be deployed. Gaps in the availability of prescription medication requirements in a predeployed status were identified indicating potential deficiencies in the capability to replenish prescription medication requirements during deployment.

  20. Intelligent transportation systems at the 2002 Salt Lake City Olympic Games : traffic management and traveler information case study

    DOT National Transportation Integrated Search

    2003-04-01

    Utah Department of Transportation (UDOT) contracted for a series of evaluation efforts associated with the development, deployment, and operation of their Intelligent Transportation Systems (ITS) in the Salt Lake City Region, which are known as the C...

  1. An extensible, low-cost drifter control unit

    NASA Astrophysics Data System (ADS)

    Giudici, Andrea; Torsvik, Tomas; Soomere, Tarmo

    2017-04-01

    We introduce an extensible, low-cost drifter control unit, which is developed for use with surface drifters that are deployed in inland water bodies or near-coast regions. The control unit is custom-built on top of a small footprint micro controller. It makes use of a GPS receiver for position tracking, a GSM radio for data transmission, and two sensor buses to handle analog and digital data measured by an array of external sensors. A cloud-based data collection platform receives and stores the data transmitted over GPRS from the drifter. The control unit was found to perform satisfactorily in operational testing, providing data at sub-Hz frequency for position and temperature during extended time. Test deployments revealed some issues related to power consumption spikes. Even though the unit is fully functional in the present form and shows, on average, low energy consumption , battery packs with relatively large maximum output power are required to ensure its operation within prolonged periods of time. We expect that a further development of the power supply unit together with a careful de-synchronization scheme of sensors' operation would smooth those peaks without any loss of the quality of recorded information.

  2. Deployment Experiences, Social Support, and Mental Health: Comparison of Black, White, and Hispanic U.S. Veterans Deployed to Afghanistan and Iraq.

    PubMed

    Muralidharan, Anjana; Austern, David; Hack, Samantha; Vogt, Dawne

    2016-06-01

    Compared to their White counterparts, Black and Hispanic Vietnam-era, male, combat veterans in the United States have experienced discrimination and increased trauma exposure during deployment and exhibited higher rates of postdeployment mental health disorders. The present study examined differences in deployment experiences and postdeployment mental health among male and female Black, Hispanic, and White veterans deployed in support of Operation Enduring Freedom in Afghanistan and Operation Iraqi Freedom in Iraq. Data were drawn from a national survey of veterans (N = 924) who had returned from deployment within the last 2 years. Ethnoracial minority veterans were compared to White veterans of the same gender on deployment experiences and postdeployment mental health. The majority of comparisons did not show significant differences; however, several small group differences did emerge (.02 < η(2) < .04). Ethnoracial minority veterans reported greater perceived threat in the warzone and more family-related concerns and stressors during deployment than White veterans of the same gender. Minority female veterans reported higher levels of postdeployment symptoms of anxiety than their White counterparts, which were accounted for by differences in deployment experience. These differences call for ongoing monitoring. Copyright © 2016 International Society for Traumatic Stress Studies.

  3. The development of an integrated Indonesian health care model using Kano's model, quality function deployment and balanced scorecard

    NASA Astrophysics Data System (ADS)

    Jonny, Zagloed, Teuku Yuri M.

    2017-11-01

    This paper aims to present an integrated health care model for Indonesian health care industry. Based on previous researches, there are two health care models in the industry such as decease- and patient-centered care models. In their developments, the patient-centered care model is widely applied due to its capability in reducing cost and improving quality simultaneously. However, there is still no comprehensive model resulting in cost reduction, quality improvement, patient satisfaction and hospital profitability simultaneously. Therefore, this research is intended to develop that model. In doing so, first, a conceptual model using Kano's Model, Quality Function Deployment (QFD) and Balanced Scorecard (BSC) is developed to generate several important elements of the model as required by stakeholders. Then, a case study of an Indonesian hospital is presented to evaluate the validity of the model using correlation analysis. As a result, it can be concluded that the model is validated implying several managerial insights among its elements such as l) leadership (r=0.85) and context of the organization (r=0.77) improve operations; 2) planning (r=0.96), support process (r=0.87) and continual improvement (r=0.95) also improve operations; 3) operations improve customer satisfaction (r=0.89) and financial performance (r=0.93) and 4) customer satisfaction improves the financial performance (0.98).

  4. On-Orbit Checkout and Activation of the ISS Oxygen Generation System

    NASA Technical Reports Server (NTRS)

    Bagdigian, Robert M.; Prokhorov, Kimberlee S.

    2007-01-01

    NASA has developed and; deployed an Oxygen Generation System (OGS) into the Destiny Module of the International Space Station (ISS). The major. assembly; included in this system is the Oxygen Generator Assembly. (OGA) which was developed under NASA contract by Hamilton Sundstrand Space Systems International (HSSSI), Inc. This paper summarizes the installation of the system into the Destiny Module, its initial checkout and periodic preventative maintenance activities, and its operational activation. Trade studies and analyses that were conducted with the goal of mitigating on-orbit operational risks are also discussed.

  5. An investigation of interference coordination in heterogeneous network for LTE-Advanced systems

    NASA Astrophysics Data System (ADS)

    Hasan, M. K.; Ismail, A. F.; H, Aisha-Hassan A.; Abdullah, Khaizuran; Ramli, H. A. M.

    2013-12-01

    The novel "femtocell" in Heterogeneous Network (HetNet) for LTE-Advanced (LTE-A) set-up will allow Malaysian wireless telecommunication operators (Maxis, Celcom, Digi, U-Mobile, P1, YTL and etc2.) to extend connectivity coverage where access would otherwise be limited or unavailable, particularly indoors of large building complexes. A femtocell is a small-sized cellular base station that encompasses all the functionality of a typical station. It therefore allows a simpler and self-contained deployment including private residences. For the Malaysian service providers, the main attractions of femtocell usage are the improvements to both coverage and capacity. The operators can provide a better service to end-users in turn reduce much of the agitations and complaints. There will be opportunity for new services at reduced cost. In addition, the operator not only benefits from the improved capacity and coverage but also can reduce both capital expenditure and operating expense i.e. alternative to brand new base station or macrocell installation. Interference is a key issue associated with femtocell development. There are a large number of issues associated with interference all of which need to be investigated, identified, quantified and solved. This is to ensure that the deployment of any femtocells will take place successfully. Among the most critical challenges in femtocell deployment is the interference between femtocell-to-macrocell and femtocell-to-femtocell in HetNets. In this paper, all proposed methods and algorithms will be investigated in the OFDMA femtocell system considering HetNet scenarios for LTE-A.

  6. Application of Information Technology Solution for Early Warning Systems at Water Utilities

    NASA Astrophysics Data System (ADS)

    Bałut, Alicja

    2018-02-01

    Deployment of IT solutions in water utilities in Poland concerns nowadays lots beyond GIS implementation projects [1]. The scope of modern IT platforms is truly advanced software for complete management of water treatment processes and involved objects, including ranges of various types of equipment. There are multiply factors that disrupt required volumes of supplied water. They are normally classified as natural, accidental and intentional. This paper addresses potential residing in already deployed IT solutions of water utilities in and also in new ones being now developed. Primarily- from the perspective of intentional, terrorist threats. This document depicts operating procedures that are called in case of spotted contamination in a water supply (damage of key elements of the network infrastructure) or in case of an introduction factors. This paper also discusses relevant IT tools with access provided to network operators or water plant owners that are extremely useful in accurate pinpointing the treat and in following relevant operating procedures and related actions.

  7. Two-tier tube-trailer pressure consolidation operation method for hydrogen refueling station cost reduction

    DOE PAGES

    Reddi, Krishna; Elgowainy, Amgad; Rustagi, Neha; ...

    2018-01-10

    An operation strategy known as two-tier “pressure consolidation” of delivered tube-trailers (or equivalent supply storage) has been developed to maximize the throughput at gaseous hydrogen refueling stations (HRSs) for fuel cell electric vehicles (FCEVs). The high capital costs of HRSs and the consequent high investment risk are deterring growth of the infrastructure needed to promote the deployment of FCEVs. Stations supplied by gaseous hydrogen will be necessary for FCEV deployment in both the near and long term. Here, the two-tier pressure consolidation method enhances gaseous HRSs in the following ways: (1) reduces the capital cost compared with conventional stations, asmore » well as those operating according to the original pressure consolidation approach described by Elgowainy et al. (2014) [1], (2) minimizes pressure cycling of HRS supply storage relative to the original pressure consolidation approach; and (3) increases use of the station’s supply storage (or delivered tube-trailers) while maintaining higher state-of-charge vehicle fills.« less

  8. Two-tier tube-trailer pressure consolidation operation method for hydrogen refueling station cost reduction

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Reddi, Krishna; Elgowainy, Amgad; Rustagi, Neha

    An operation strategy known as two-tier “pressure consolidation” of delivered tube-trailers (or equivalent supply storage) has been developed to maximize the throughput at gaseous hydrogen refueling stations (HRSs) for fuel cell electric vehicles (FCEVs). The high capital costs of HRSs and the consequent high investment risk are deterring growth of the infrastructure needed to promote the deployment of FCEVs. Stations supplied by gaseous hydrogen will be necessary for FCEV deployment in both the near and long term. Here, the two-tier pressure consolidation method enhances gaseous HRSs in the following ways: (1) reduces the capital cost compared with conventional stations, asmore » well as those operating according to the original pressure consolidation approach described by Elgowainy et al. (2014) [1], (2) minimizes pressure cycling of HRS supply storage relative to the original pressure consolidation approach; and (3) increases use of the station’s supply storage (or delivered tube-trailers) while maintaining higher state-of-charge vehicle fills.« less

  9. Apparatus and method for suppressing sound in a gas turbine engine powerplant

    NASA Technical Reports Server (NTRS)

    Wynosky, Thomas A. (Inventor); Mischke, Robert J. (Inventor)

    1992-01-01

    A method and apparatus for suppressing jet noise in a gas turbine engine powerplant 10 is disclosed. Various construction details are developed for providing sound suppression at sea level take-off operative conditions and not providing sound suppression at cruise operative conditions. In one embodiment, the powerplant 10 has a lobed mixer 152 between a primary flowpath 44 and a second flowpath 46, a diffusion region downstream of the lobed mixer region (first mixing region 76), and a deployable ejector/mixer 176 in the diffusion region which forms a second mixing region 78 having a diffusion flowpath 72 downstream of the ejector/mixer and sound absorbing structure 18 bounding the flowpath throughout the diffusion region. The method includes deploying the ejector/mixer 176 at take-off and stowing the ejector/mixer at cruise.

  10. Florida specific NTCIP MIB development for actuated signal controller (ASC), closed-circuit television (CCTV), and center-to-center (C2C) communications with SunGuideSM software and ITS device test procedure development : technical report documentation pa

    DOT National Transportation Integrated Search

    2009-06-30

    The project has been focused on National Transportation Communications for ITS Protocol : (NTCIP) research and testing across the entire life cycle of traffic operations, ITS, and statewide : communications deployments. This life cycle includes desig...

  11. Embedded ARM system for volcano monitoring in remote areas: application to the active volcano on Deception Island (Antarctica).

    PubMed

    Peci, Luis Miguel; Berrocoso, Manuel; Fernández-Ros, Alberto; García, Alicia; Marrero, José Manuel; Ortiz, Ramón

    2014-01-02

    This paper describes the development of a multi-parameter system for monitoring volcanic activity. The system permits the remote access and the connection of several modules in a network. An embedded ARM™ processor has been used, allowing a great flexibility in hardware configuration. The use of a complete Linux solution (Debian™) as Operating System permits a quick, easy application development to control sensors and communications. This provides all the capabilities required and great stability with relatively low energy consumption. The cost of the components and applications development is low since they are widely used in different fields. Sensors and commercial modules have been combined with other self-developed modules. The Modular Volcano Monitoring System (MVMS) described has been deployed on the active Deception Island (Antarctica) volcano, within the Spanish Antarctic Program, and has proved successful for monitoring the volcano, with proven reliability and efficient operation under extreme conditions. In another context, i.e., the recent volcanic activity on El Hierro Island (Canary Islands) in 2011, this technology has been used for the seismic equipment and GPS systems deployed, thus showing its efficiency in the monitoring of a volcanic crisis.

  12. Embedded ARM System for Volcano Monitoring in Remote Areas: Application to the Active Volcano on Deception Island (Antarctica)

    PubMed Central

    Peci, Luis Miguel; Berrocoso, Manuel; Fernández-Ros, Alberto; García, Alicia; Marrero, José Manuel; Ortiz, Ramón

    2014-01-01

    This paper describes the development of a multi-parameter system for monitoring volcanic activity. The system permits the remote access and the connection of several modules in a network. An embedded ARM™™ processor has been used, allowing a great flexibility in hardware configuration. The use of a complete Linux solution (Debian™) as Operating System permits a quick, easy application development to control sensors and communications. This provides all the capabilities required and great stability with relatively low energy consumption. The cost of the components and applications development is low since they are widely used in different fields. Sensors and commercial modules have been combined with other self-developed modules. The Modular Volcano Monitoring System (MVMS) described has been deployed on the active Deception Island (Antarctica) volcano, within the Spanish Antarctic Program, and has proved successful for monitoring the volcano, with proven reliability and efficient operation under extreme conditions. In another context, i.e., the recent volcanic activity on El Hierro Island (Canary Islands) in 2011, this technology has been used for the seismic equipment and GPS systems deployed, thus showing its efficiency in the monitoring of a volcanic crisis. PMID:24451461

  13. Contingency Base Camp Operations and Management: Staffing and Organization

    DTIC Science & Technology

    2013-09-17

    security, safety , environmental and health risks to deployed forces. This study was undertaken to address operations and management (O&M) requirements...security, safety , envi- ronmental and health risks to deployed forces. This study was undertaken to address operations and management (O&M) requirements... food service oversight • Joint Visitor Bureau ERDC/CERL TR-13-18 16 • MWR. TF Archer was significantly augmented with engineer personnel to

  14. Small-scale nuclear reactors for remote military operations: opportunities and challenges

    DTIC Science & Technology

    2015-08-25

    study – Report was published in March 2011  CNA study identified challenges to deploy small modular reactors (SMRs) at a base – Identified First-of...forward operating bases. The availability of deployable, cost-effective, regulated, and secure small modular reactors with a modest output electrical...defense committees on the challenges, operational requirements, constraints, cost, and life cycle analysis for a small modular reactor of less than 10

  15. Thermal design of the XTE deployables

    NASA Astrophysics Data System (ADS)

    Neuberger, David

    1997-01-01

    This paper describes the thermal design and flight results of the X-Ray Timing Explorer (XTE) deployable mechanisms. The two subsystems discussed are the SADA and the APS gimbal. The SADA (Solar Array Drive Assembly) is the mechanism that maneuvers the solar arrays during flight operation and the APS gimbal (Antenna Pointing System gimbal) is the mechanism that maneuvers the high gain antenna during flight operation. Testing and analysis will be covered where appropriate and flight results will be given and compared to requirements. The XTE spacecraft was launched in December 30, 1995at8:40 EST. The solar arrays and both high gain antennas deployed nominally and are operating within their temperature limits.

  16. Smart Grid Communications System Blueprint

    NASA Astrophysics Data System (ADS)

    Clark, Adrian; Pavlovski, Chris

    2010-10-01

    Telecommunications operators are well versed in deploying 2G and 3G wireless networks. These networks presently support the mobile business user and/or retail consumer wishing to place conventional voice calls and data connections. The electrical power industry has recently commenced transformation of its distribution networks by deploying smart monitoring and control devices throughout their networks. This evolution of the network into a `smart grid' has also motivated the need to deploy wireless technologies that bridge the communication gap between the smart devices and information technology systems. The requirements of these networks differ from traditional wireless networks that communications operators have deployed, which have thus far forced energy companies to consider deploying their own wireless networks. We present our experience in deploying wireless networks to support the smart grid and highlight the key properties of these networks. These characteristics include application awareness, support for large numbers of simultaneous cell connections, high service coverage and prioritized routing of data. We also outline our target blueprint architecture that may be useful to the industry in building wireless and fixed networks to support the smart grid. By observing our experiences, telecommunications operators and equipment manufacturers will be able to augment their current networks and products in a way that accommodates the needs of the emerging industry of smart grids and intelligent electrical networks.

  17. Ensemble: an Architecture for Mission-Operations Software

    NASA Technical Reports Server (NTRS)

    Norris, Jeffrey; Powell, Mark; Fox, Jason; Rabe, Kenneth; Shu, IHsiang; McCurdy, Michael; Vera, Alonso

    2008-01-01

    Ensemble is the name of an open architecture for, and a methodology for the development of, spacecraft mission operations software. Ensemble is also potentially applicable to the development of non-spacecraft mission-operations- type software. Ensemble capitalizes on the strengths of the open-source Eclipse software and its architecture to address several issues that have arisen repeatedly in the development of mission-operations software: Heretofore, mission-operations application programs have been developed in disparate programming environments and integrated during the final stages of development of missions. The programs have been poorly integrated, and it has been costly to develop, test, and deploy them. Users of each program have been forced to interact with several different graphical user interfaces (GUIs). Also, the strategy typically used in integrating the programs has yielded serial chains of operational software tools of such a nature that during use of a given tool, it has not been possible to gain access to the capabilities afforded by other tools. In contrast, the Ensemble approach offers a low-risk path towards tighter integration of mission-operations software tools.

  18. Self-Deploying Trusses Containing Shape-Memory Polymers

    NASA Technical Reports Server (NTRS)

    Schueler, Robert M.

    2008-01-01

    Composite truss structures are being developed that can be compacted for stowage and later deploy themselves to full size and shape. In the target applications, these smart structures will precisely self-deploy and support a large, lightweight space-based antenna. Self-deploying trusses offer a simple, light, and affordable alternative to articulated mechanisms or inflatable structures. The trusses may also be useful in such terrestrial applications as variable-geometry aircraft components or shelters that can be compacted, transported, and deployed quickly in hostile environments. The truss technology uses high-performance shape-memory-polymer (SMP) thermoset resin reinforced with fibers to form a helical composite structure. At normal operating temperatures, the truss material has the structural properties of a conventional composite. This enables truss designs with required torsion, bending, and compression stiffness. However, when heated to its designed glass transition temperature (Tg), the SMP matrix acquires the flexibility of an elastomer. In this state, the truss can be compressed telescopically to a configuration encompassing a fraction of its original volume. When cooled below Tg, the SMP reverts to a rigid state and holds the truss in the stowed configuration without external constraint. Heating the materials above Tg activates truss deployment as the composite material releases strain energy, driving the truss to its original memorized configuration without the need for further actuation. Laboratory prototype trusses have demonstrated repeatable self-deployment cycles following linear compaction exceeding an 11:1 ratio (see figure).

  19. Systems Engineering Approach to Develop Guidance, Navigation and Control Algorithms for Unmanned Ground Vehicle

    DTIC Science & Technology

    2016-09-01

    identification and tracking algorithm. 14. SUBJECT TERMS unmanned ground vehicles , pure pursuit, vector field histogram, feature recognition 15. NUMBER OF...located within the various theaters of war. The pace for the development and deployment of unmanned ground vehicles (UGV) was, however, not keeping...DEVELOPMENT OF UNMANNED GROUND VEHICLES The development and fielding of UGVs in an operational role are not a new concept in the battlefield. In

  20. Solar Access to Public Capital (SAPC) Working Group: Best Practices in PV System Installation; Version 1.0, March 2015; Period of Performance, October 2014 - September 2015

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Doyle, C.; Truitt, A.; Inda, D.

    The following Photovoltaics Installation Best Practices Guide is one of several work products developed by the Solar Access to Public Capital (SAPC) working group, which works to open capital market investment. SAPC membership includes over 450 leading solar developers, financiers and capital managers, law firms, rating agencies, accounting and engineering firms, and other stakeholders engaged in solar asset deployment. SAPC activities are directed toward foundational elements necessary to pool project cash flows into tradable securities: standardization of power purchase and lease contracts for residential and commercial end customers; development of performance and credit data sets to facilitate investor due diligencemore » activities; comprehension of risk perceived by rating agencies; and the development of best practice guides for PV system installation and operations and maintenance (O&M) in order to encourage high-quality system deployment and operation that may improve lifetime project performance and energy production. This PV Installation Best Practices Guide was developed through the SAPC Installation Best Practices subcommittee, a subgroup of SAPC comprised of a wide array of solar industry leaders in numerous fields of practice. The guide was developed over roughly one year and eight months of direct engagement by the subcommittee and two working group comment periods.« less

  1. Cognitive Task Analysis and Work-Centered Support System Recommendations for a Deployed Network Operations Support Center (NOSC-D)

    DTIC Science & Technology

    2001-08-01

    This report presents the results of a preliminary Cognitive Task Analysis (CTA) of the deployed Network Operations Support Center (NOSC-D), and the...conducted Cognitive Task Analysis interviews with four (4) NOSC-D personnel. Because of the preliminary nature of the finding, the analysis is

  2. Designing, Evaluating, and Deploying Automated Scoring Systems with Validity in Mind: Methodological Design Decisions

    ERIC Educational Resources Information Center

    Rupp, André A.

    2018-01-01

    This article discusses critical methodological design decisions for collecting, interpreting, and synthesizing empirical evidence during the design, deployment, and operational quality-control phases for automated scoring systems. The discussion is inspired by work on operational large-scale systems for automated essay scoring but many of the…

  3. The Role of Psychological Symptomatology and Social Support in the Academic Adjustment of Previously Deployed Student Veterans

    ERIC Educational Resources Information Center

    Campbell, Robyn; Riggs, Shelley A.

    2015-01-01

    Context: Research has indicated that returning Operation Enduring Freedom/Operation Iraqi Freedom (OEF/OIF) veterans are experiencing mental health concerns following deployment. Increasing numbers of veterans are enrolling in higher education institutions; there is a scarcity of empirical research investigating student veterans' experiences as…

  4. Genitourinary Surgical Workload at Deployed U.S. Facilities in Iraq and Afghanistan, 2002-2016.

    PubMed

    Turner, Caryn A; Orman, Jean A; Stockinger, Zsolt T; Hudak, Steven J

    2018-06-13

    Genitourinary surgery constitutes approximately 1.15% of procedures performed for combat injuries. During forward deployment, surgeons usually deploy without urology support. To better understand the training and skills maintenance needs for genitourinary procedures by describing in detail the genitourinary surgical workload during 15 years of combat operations and compare our findings with those from previously published articles. A retrospective analysis of the Department of Defense Trauma Registry (DoDTR) was performed for all Roles 2 and 3 medical treatment facilities in Iraq and Afghanistan, from January 2002 to May 2016. The 177 ICD-9-CM procedure codes identified as genitourinary procedures were grouped into 15 anatomic categories by subject matter experts. Select groups were further subdivided by procedure types. Descriptive analyses were performed and stratified workload percentiles were calculated for the 10th, 50th, and 90th percentiles. Data analysis was performed using Stata Version 14 (College Station, TX, USA). This quality improvement project was deemed exempt from institutional review board review by the U.S. Army Institute of Surgical Research. A total of 3,963 genitourinary surgical procedures were identified, the majority occurring at Role 3 medical treatment facilities (3,512, 88.6%). The most common procedure groups were testis (20.6%), bladder (18.8%), scrotum (17.7%), and kidney (13.5%). The single most common individual procedures performed were unilateral orchiectomy (394, 9.9%), suture of laceration of scrotum and tunica vaginalis (373, 9.4%), nephroureterectomy (360, 9.1%), and other suprapubic cystostomy (268, 6.8%). Of the 77 gynecological procedures, 15 were C-sections. Genitourinary caseload per facility was low, never exceeding nine procedures per month. All deploying surgeons may be required to evaluate, stage, and surgically manage genitourinary, gynecologic, and obstetrical conditions. Surgery on the male genitalia, bladder, and kidney were the most commonly required genitourinary operative procedures in deployed facilities; therefore, non-urological surgeons should receive pre-deployment training in these techniques. The workload data from our study can be used to help guide the development of pre-deployment training to ensure military surgeons have the skills to perform the specialty procedures required while deployed.

  5. Transformable and Reconfigurable Entry, Descent and Landing Systems and Methods

    NASA Technical Reports Server (NTRS)

    Fernandez, Ian M. (Inventor); Venkatapathy, Ethiraj (Inventor); Hamm, Kenneth R. (Inventor)

    2014-01-01

    A deployable aerodynamic decelerator structure includes a ring member disposed along a central axis of the aerodynamic decelerator, a plurality of jointed rib members extending radially from the ring member and a flexible layer attached to the plurality of rib members. A deployment device is operable to reconfigure the flexible layer from a stowed configuration to a deployed configuration by movement of the rib members and a control device is operable to redirect a lift vector of the decelerator structure by changing an orientation of the flexible layer.

  6. Bayesian Approach for Reliability Assessment of Sunshield Deployment on JWST

    NASA Technical Reports Server (NTRS)

    Kaminskiy, Mark P.; Evans, John W.; Gallo, Luis D.

    2013-01-01

    Deployable subsystems are essential to mission success of most spacecraft. These subsystems enable critical functions including power, communications and thermal control. The loss of any of these functions will generally result in loss of the mission. These subsystems and their components often consist of unique designs and applications, for which various standardized data sources are not applicable for estimating reliability and for assessing risks. In this study, a Bayesian approach for reliability estimation of spacecraft deployment was developed for this purpose. This approach was then applied to the James Webb Space Telescope (JWST) Sunshield subsystem, a unique design intended for thermal control of the observatory's telescope and science instruments. In order to collect the prior information on deployable systems, detailed studies of "heritage information", were conducted extending over 45 years of spacecraft launches. The NASA Goddard Space Flight Center (GSFC) Spacecraft Operational Anomaly and Reporting System (SOARS) data were then used to estimate the parameters of the conjugative beta prior distribution for anomaly and failure occurrence, as the most consistent set of available data and that could be matched to launch histories. This allows for an emperical Bayesian prediction for the risk of an anomaly occurrence of the complex Sunshield deployment, with credibility limits, using prior deployment data and test information.

  7. Flight qualification of mortar-actuated parachute deployment systems

    NASA Technical Reports Server (NTRS)

    Pleasants, J. E.

    1975-01-01

    A brief discussion outlines background of mortar use in parachute deployment systems. A description of the system operation is presented. Effects of the environment on performance are discussed as well as the instrumentation needed to assess this performance. Power unit qualification and lot qualification for shear pins and cartridges is delineated. Functional mortar system tests are described. Finally, bridle deployment and parachute deployment are discussed.

  8. NanoRack Cubesat Deployer (NRCSD) Operations

    NASA Image and Video Library

    2014-08-19

    ISS040-E-100890 (19 Aug. 2014) --- Through a window in the International Space Station?s Kibo laboratory, an Expedition 40 crew member photographed the CubeSat deployer mechanism in the grasp of the Japanese robotic arm prior to a series of NanoRacks CubeSat miniature satellite deployments.

  9. San Antonio's Medical Center Corridor: Lessons Learned From The Metropolitan Model Deployment Initiative: Reducing Delay Through Integrated Freeway & Arterial Management

    DOT National Transportation Integrated Search

    2000-10-01

    This report demonstrates the benefits and potential pitfalls of deploying and operating an integrated freeway and arterial management system. In particular, it discusses the lessons learned about the Medical Center Corridor (MCC) Project deployed in ...

  10. The Distinctive Vocation of Business Education in Catholic Universities

    ERIC Educational Resources Information Center

    Goodpaster, Kenneth E.; Maines, T. Dean

    2012-01-01

    Catholic business schools need a process to shape their operations intentionally in light of the Catholic moral tradition. Recent developments in Catholic health care suggest a model they might follow. This model uses a method known as the "Self-Assessment and Improvement Process" (SAIP), which helps leaders deploy moral principles…

  11. ENVIRONMENTAL TECHNOLOGY VERIFICATION REPORT: MOBILE SOURCE RETROFIT AIR POLLUTION CONTROL DEVICES: CLEAN CLEAR FUEL TECHNOLOGIES, INC.’S, UNIVERSAL FUEL CELL

    EPA Science Inventory

    The U.S. EPA's Office of Research and Development operates the Environmental Technology Verification (ETV) program to facilitate the deployment of innovative technologies through performance verification and information dissemination. Congress funds ETV in response to the belief ...

  12. IT Project Success w\\7120 and 7123 NPRs to Achieve Project Success

    NASA Technical Reports Server (NTRS)

    Walley, Tina L.

    2009-01-01

    This slide presentation reviews management techniques to assure information technology development project success. Details include the work products, the work breakdown structure (WBS), system integration, verification and validation (IV&V), and deployment and operations. An example, the NASA Consolidated Active Directory (NCAD), is reviewed.

  13. Continuing Development of California State Packet Radio Project.

    ERIC Educational Resources Information Center

    Brownrigg, Edwin

    1992-01-01

    Provides background on the California State Library Packet Radio project, which will use packet radios to deploy a wireless, high-speed, wide-area network of 600 nodes, including 100 libraries, in the San Francisco Bay Area. Project goals and objectives, plan of operation, equipment, and evaluation plans are summarized. (MES)

  14. An Interdisciplinary Field Robotics Program for Undergraduate Computer Science and Engineering Education

    ERIC Educational Resources Information Center

    Kitts, Christopher; Quinn, Neil

    2004-01-01

    Santa Clara University's Robotic Systems Laboratory conducts an aggressive robotic development and operations program in which interdisciplinary teams of undergraduate students build and deploy a wide range of robotic systems, ranging from underwater vehicles to spacecraft. These year-long projects expose students to the breadth of and…

  15. Prototype development and demonstration for response, emergency staging, communications, uniform management, and evacuation (R.E.S.C.U.M.E.) : information broker framework analysis.

    DOT National Transportation Integrated Search

    2015-03-01

    Through the Dynamic Mobility Applications (DMA) Program, U.S. DOT desires to improve current operational practices and transform management of future surface transportation systems. The DMA program is designed to enhance deployment of emerging techno...

  16. Juneau Airport Doppler Lidar Deployment: Extraction of Accurate Turbulent Wind Statistics

    NASA Technical Reports Server (NTRS)

    Hannon, Stephen M.; Frehlich, Rod; Cornman, Larry; Goodrich, Robert; Norris, Douglas; Williams, John

    1999-01-01

    A 2 micrometer pulsed Doppler lidar was deployed to the Juneau Airport in 1998 to measure turbulence and wind shear in and around the departure and arrival corridors. The primary objective of the measurement program was to demonstrate and evaluate the capability of a pulsed coherent lidar to remotely and unambiguously measure wind turbulence. Lidar measurements were coordinated with flights of an instrumented research aircraft operated by representatives of the University of North Dakota (UND) under the direction of the National Center for Atmospheric Research (NCAR). The data collected is expected to aid both turbulence characterization as well as airborne turbulence detection algorithm development activities within NASA and the FAA. This paper presents a summary of the deployment and results of analysis and simulation which address important issues regarding the measurement requirements for accurate turbulent wind statistics extraction.

  17. Requirements Definition for ORNL Trusted Corridors Project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Walker, Randy M; Hill, David E; Smith, Cyrus M

    2008-02-01

    The ORNL Trusted Corridors Project has several other names: SensorNet Transportation Pilot; Identification and Monitoring of Radiation (in commerce) Shipments (IMR(ic)S); and Southeastern Transportation Corridor Pilot (SETCP). The project involves acquisition and analysis of transportation data at two mobile and three fixed inspection stations in five states (Kentucky, Mississippi, South Carolina, Tennessee, and Washington DC). Collaborators include the State Police organizations that are responsible for highway safety, law enforcement, and incident response. The three states with fixed weigh-station deployments (KY, SC, TN) are interested in coordination of this effort for highway safety, law enforcement, and sorting/targeting/interdiction of potentially non-compliant vehicles/persons/cargo.more » The Domestic Nuclear Detection Office (DNDO) in the U.S. Department of Homeland Security (DHS) is interested in these deployments, as a Pilot test (SETCP) to identify Improvised Nuclear Devices (INDs) in highway transport. However, the level of DNDO integration among these state deployments is presently uncertain. Moreover, DHS issues are considered secondary by the states, which perceive this work as an opportunity to leverage these (new) dual-use technologies for state needs. In addition, present experience shows that radiation detectors alone cannot detect DHS-identified IND threats. Continued SETCP success depends on the level of integration of current state/local police operations with the new DHS task of detecting IND threats, in addition to emergency preparedness and homeland security. This document describes the enabling components for continued SETCP development and success, including: sensors and their use at existing deployments (Section 1); personnel training (Section 2); concept of operations (Section 3); knowledge discovery from the copious data (Section 4); smart data collection, integration and database development, advanced algorithms for multiple sensors, and network communications (Section 5); and harmonization of local, state, and Federal procedures and protocols (Section 6).« less

  18. Analysis of radio wave propagation for ISM 2.4 GHz Wireless Sensor Networks in inhomogeneous vegetation environments.

    PubMed

    Azpilicueta, Leire; López-Iturri, Peio; Aguirre, Erik; Mateo, Ignacio; Astrain, José Javier; Villadangos, Jesús; Falcone, Francisco

    2014-12-10

    The use of wireless networks has experienced exponential growth due to the improvements in terms of battery life and low consumption of the devices. However, it is compulsory to conduct previous radio propagation analysis when deploying a wireless sensor network. These studies are necessary to perform an estimation of the range coverage, in order to optimize the distance between devices in an actual network deployment. In this work, the radio channel characterization for ISM 2.4 GHz Wireless Sensor Networks (WSNs) in an inhomogeneous vegetation environment has been analyzed. This analysis allows designing environment monitoring tools based on ZigBee and WiFi where WSN and smartphones cooperate, providing rich and customized monitoring information to users in a friendly manner. The impact of topology as well as morphology of the environment is assessed by means of an in-house developed 3D Ray Launching code, to emulate the realistic operation in the framework of the scenario. Experimental results gathered from a measurement campaign conducted by deploying a ZigBee Wireless Sensor Network, are analyzed and compared with simulations in this paper. The scenario where this network is intended to operate is a combination of buildings and diverse vegetation species. To gain insight in the effects of radio propagation, a simplified vegetation model has been developed, considering the material parameters and simplified geometry embedded in the simulation scenario. An initial location-based application has been implemented in a real scenario, to test the functionality within a context aware scenario. The use of deterministic tools can aid to know the impact of the topological influence in the deployment of the optimal Wireless Sensor Network in terms of capacity, coverage and energy consumption, making the use of these systems attractive for multiple applications in inhomogeneous vegetation environments.

  19. Design and development of bio-inspired framework for reservoir operation optimization

    NASA Astrophysics Data System (ADS)

    Asvini, M. Sakthi; Amudha, T.

    2017-12-01

    Frameworks for optimal reservoir operation play an important role in the management of water resources and delivery of economic benefits. Effective utilization and conservation of water from reservoirs helps to manage water deficit periods. The main challenge in reservoir optimization is to design operating rules that can be used to inform real-time decisions on reservoir release. We develop a bio-inspired framework for the optimization of reservoir release to satisfy the diverse needs of various stakeholders. In this work, single-objective optimization and multiobjective optimization problems are formulated using an algorithm known as "strawberry optimization" and tested with actual reservoir data. Results indicate that well planned reservoir operations lead to efficient deployment of the reservoir water with the help of optimal release patterns.

  20. Operation Iraqi Freedom 06-08

    DTIC Science & Technology

    2008-02-14

    Managemen 15.6.6 Results Related t 15.6.7 NCOs and Multiple-Deployments 15.6.8 Validated Trainin 15.6.9 Theater Suicide Prevention Program and Suicide...include mental health providers who have deployed to the IT0 and are experienced using AHLTA- T . As noted above, as the operational theater matures in...Mental Health Advisory Team (MHAT) V Operation Iraqi Freedom 06-08 14 February 2008 Office of the Surgeon Multi-National Force-Iraq and Office

  1. Assessment of the Warrant Officer Technical and Tactical Certification Course (WOTTC)

    DTIC Science & Technology

    2009-06-01

    training and deployment as part of an operational detachment. In addition, SF candidates who attended the WOCS tended to be older, more experienced...and able to demonstrate higher levels of task and skill proficiency than Soldiers from other MOSs. Leaders at the U.S. Army Special Operations ...deployment as part of an operational detachment. In addition, SF candidates who attended the WOCS tended to be older, more experienced, and able to

  2. Delivering spacecraft control centers with embedded knowledge-based systems: The methodology issue

    NASA Technical Reports Server (NTRS)

    Ayache, S.; Haziza, M.; Cayrac, D.

    1994-01-01

    Matra Marconi Space (MMS) occupies a leading place in Europe in the domain of satellite and space data processing systems. The maturity of the knowledge-based systems (KBS) technology, the theoretical and practical experience acquired in the development of prototype, pre-operational and operational applications, make it possible today to consider the wide operational deployment of KBS's in space applications. In this perspective, MMS has to prepare the introduction of the new methods and support tools that will form the basis of the development of such systems. This paper introduces elements of the MMS methodology initiatives in the domain and the main rationale that motivated the approach. These initiatives develop along two main axes: knowledge engineering methods and tools, and a hybrid method approach for coexisting knowledge-based and conventional developments.

  3. Development of moored oceanographic spectroradiometer

    NASA Technical Reports Server (NTRS)

    Booth, Charles R.; Mitchell, B. Greg; Holm-Hansen, O.

    1987-01-01

    Biospherical Instruments has successfully completed a NASA sponsored SBIR (Small Business Innovational Research Program) project to develop spectroradiometers capable of being deployed in the ocean for long periods of time. The completion of this project adds a valuable tool for the calibration of future spaceborne ocean color sensors and enables oceanographers to extend remote sensing optical techniques beyond the intermittent coverage of spaceborne sensors. Highlights of the project include two moorings totalling 8 months generating extensive sets of optical, biological, and physical data sets in the ocean off La Jolla, California, and a 70 day operational deployment of the resulting commercial product by the ONR and NASA sponsored BIOWATT program. Based on experience gained in these moorings, Biospherical Instruments has developed a new line of spectroradiometers designed to support the oceanographic remote sensing missions of NASA, the Navy, and various oceanographers.

  4. Technology development for cryogenic deployable telescope structures and mechanisms

    NASA Astrophysics Data System (ADS)

    Atkinson, Charles B.; Gilman, Larry; Reynolds, Paul

    2003-12-01

    At 6-7 meters in diameter, the James Webb Space Telescope (JWST) will require structures that remain stable to levels that are on the order of 10 nanometers under dynamic and thermal loading while operating at cryogenic temperatures. Moreover, the JWST will be the first telescope in space that is deployed, resulting in an aperture that is not only segmented, but has hinge-lines and the associated joining systems or latches in it. In order to understand the behavior and reduce the risk associated with very large, deployed structures and the stability of the associated structure and latches, we developed and tested the largest cryogenic structure ever built and then characterized its stability. This paper presents a description of the design of the Development Optical Telescope Assembly (DOTA), the testing performed, and the results of the testing performed on it. We discuss the material selection and characterization processes, give a description of the test configurations, describe the metrology equipment and the validation process for it, provide the test results, and summarize the conclusions drawn from the results. The testing and associated results include characterization of the thermal stability of the large-scale structure, characterization of the micro-dynamic stability of the latching system, and measurements of the deployment capability of the mechanisms. We also describe how the DOTA design relates to the JWST design and how the test results relate to the JWST requirements.

  5. SRMS History, Evolution and Lessons Learned

    NASA Technical Reports Server (NTRS)

    Jorgensen, Glenn; Bains, Elizabeth

    2011-01-01

    Early in the development of the Space Shuttle, it became clear that NASA needed a method of deploying and retrieving payloads from the payload bay. The Shuttle Remote Manipulator System (SRMS) was developed to fill this need. The 50 foot long robotic arm is an anthropomorphic design consisting of three electromechanical joints, six degrees of freedom, and two boom segments. Its composite boom construction provided a light weight solution needed for space operations. Additionally, a method of capturing payloads with the arm was required and a unique End Effector was developed using an electromechanical snare mechanism. The SRMS is operated using a Displays and Controls Panel and hand controllers located within the aft crew compartment of the shuttle. Although the SRMS was originally conceived to deploy and retrieve payloads, its generic capabilities allowed it to perform many other functions not originally conceived of. Over the years it has been used for deploying and retrieving constrained and free flying payloads, maneuvering and supporting EVA astronauts, satellite repair, International Space Station construction, and as a viewing aid for on-orbit International Space Station operations. After the Columbia accident, a robotically compatible Orbiter Boom Sensor System (OBSS) was developed and used in conjunction with the SRMS to scan the Thermal Protection System (TPS) of the shuttle. These scans ensure there is not a breach of the TPS prior to shuttle re-entry. Ground operations and pre mission simulation, analysis and planning played a major role in the success of the SRMS program. A Systems Engineering Simulator (SES) was developed to provide a utility complimentary to open loop engineering simulations. This system provided a closed-loop real-time pilot-driven simulation giving visual feedback, display and control panel interaction, and integration with other vehicle systems, such as GN&C. It has been useful for many more applications than traditional training. Evolution of the simulations, guided by the Math Model Working Group, showed the utility of input from multiple modeling groups with a structured forum for discussion.There were many unique development challenges in the areas of hardware, software, certification, modeling and simulation. Over the years, upgrades and enhancements were implemented to increase the capability, performance and safety of the SRMS. The history and evolution of the SRMS program provided many lessons learned that can be used for future space robotic systems.

  6. A Novel Solid State Non-Dispersive Infrared CO2 Gas Sensor Compatible with Wireless and Portable Deployment

    PubMed Central

    Gibson, Desmond; MacGregor, Calum

    2013-01-01

    This paper describes development of a novel mid-infrared light emitting diode (LED) and photodiode (PD) light source/detector combination and use within a non-dispersive infrared (NDIR) carbon dioxide gas sensor. The LED/PD based NDIR sensor provides fast stabilisation time (time required to turn on the sensor from cold, warm up, take and report a measurement, and power down again ≈1 second), longevity (>15 years), low power consumption and low cost. Described performance is compatible with “fit and forget” wireless deployed sensors in applications such as indoor air quality monitoring/control & energy conservation in buildings, transport systems, horticultural greenhouses and portable deployment for safety, industrial and medical applications. Fast stabilisation time, low intrinsic power consumption and cycled operation offer typical energy consumption per measurement of mJ's, providing extended operation using battery and/or energy harvesting strategies (measurement interval of ≈ 2 minutes provides >10 years operation from one AA battery). Specific performance data is provided in relation to measurement accuracy and noise, temperature performance, cross sensitivity, measurement range (two pathlength variants are described covering ambient through to 100% gas concentration), comparison with NDIR utilizing thermal source/pyroelectric light source/detector combination and compatibility with energy harvesting. Semiconductor based LED/PD processing together with injection moulded reflective optics and simple assembly provide a route to low cost high volume manufacturing. PMID:23760090

  7. A novel solid state non-dispersive infrared CO2 gas sensor compatible with wireless and portable deployment.

    PubMed

    Gibson, Desmond; MacGregor, Calum

    2013-05-29

    This paper describes development of a novel mid-infrared light emitting diode (LED) and photodiode (PD) light source/detector combination and use within a non-dispersive infrared (NDIR) carbon dioxide gas sensor. The LED/PD based NDIR sensor provides fast stabilisation time (time required to turn on the sensor from cold, warm up, take and report a measurement, and power down again ≈1 second), longevity (>15 years), low power consumption and low cost. Described performance is compatible with "fit and forget" wireless deployed sensors in applications such as indoor air quality monitoring/control & energy conservation in buildings, transport systems, horticultural greenhouses and portable deployment for safety, industrial and medical applications. Fast stabilisation time, low intrinsic power consumption and cycled operation offer typical energy consumption per measurement of mJ's, providing extended operation using battery and/or energy harvesting strategies (measurement interval of ≈ 2 minutes provides >10 years operation from one AA battery). Specific performance data is provided in relation to measurement accuracy and noise, temperature performance, cross sensitivity, measurement range (two pathlength variants are described covering ambient through to 100% gas concentration), comparison with NDIR utilizing thermal source/pyroelectric light source/detector combination and compatibility with energy harvesting. Semiconductor based LED/PD processing together with injection moulded reflective optics and simple assembly provide a route to low cost high volume manufacturing.

  8. Large-N Seismic Deployment at the Source Physics Experiment (SPE) Site

    NASA Astrophysics Data System (ADS)

    Chen, T.; Snelson, C. M.; Mellors, R. J.; Pitarka, A.

    2015-12-01

    The Source Physics Experiment (SPE) is multi-institutional and multi-disciplinary project that consists of a series of chemical explosion experiments at the Nevada National Security Site. The goal of SPE is to understand the complicated effect of earth structures on source energy partitioning and seismic wave propagation, develop and validate physics-based monitoring, and ultimately better discriminate low-yield nuclear explosions from background seismicity. Deployment of a large number of seismic sensors is planned for SPE to image the full 3-D wavefield with about 500 three-component sensors and 500 vertical component sensors. This large-N seismic deployment will operate near the site of SPE-5 shot for about one month, recording the SPE-5 shot, ambient noise, and additional controlled-sources. This presentation focuses on the design of the large-N seismic deployment. We show how we optimized the sensor layout based on the geological structure and experiment goals with a limited number of sensors. In addition, we will also show some preliminary record sections from deployment. This work was conducted under Contract No. DE-AC52-06NA25946 with the U.S. Department of Energy.

  9. Biomimetic Models for An Ecological Approach to Massively-Deployed Sensor Networks

    NASA Technical Reports Server (NTRS)

    Jones, Kennie H.; Lodding, Kenneth N.; Olariu, Stephan; Wilson, Larry; Xin, Chunsheng

    2005-01-01

    Promises of ubiquitous control of the physical environment by massively-deployed wireless sensor networks open avenues for new applications that will redefine the way we live and work. Due to small size and low cost of sensor devices, visionaries promise systems enabled by deployment of massive numbers of sensors ubiquitous throughout our environment working in concert. Recent research has concentrated on developing techniques for performing relatively simple tasks with minimal energy expense, assuming some form of centralized control. Unfortunately, centralized control is not conducive to parallel activities and does not scale to massive size networks. Execution of simple tasks in sparse networks will not lead to the sophisticated applications predicted. We propose a new way of looking at massively-deployed sensor networks, motivated by lessons learned from the way biological ecosystems are organized. We demonstrate that in such a model, fully distributed data aggregation can be performed in a scalable fashion in massively deployed sensor networks, where motes operate on local information, making local decisions that are aggregated across the network to achieve globally-meaningful effects. We show that such architectures may be used to facilitate communication and synchronization in a fault-tolerant manner, while balancing workload and required energy expenditure throughout the network.

  10. Estimating traffic volumes for signalized intersections using connected vehicle data

    DOE PAGES

    Zheng, Jianfeng; Liu, Henry X.

    2017-04-17

    Recently connected vehicle (CV) technology has received significant attention thanks to active pilot deployments supported by the US Department of Transportation (USDOT). At signalized intersections, CVs may serve as mobile sensors, providing opportunities of reducing dependencies on conventional vehicle detectors for signal operation. However, most of the existing studies mainly focus on scenarios that penetration rates of CVs reach certain level, e.g., 25%, which may not be feasible in the near future. How to utilize data from a small number of CVs to improve traffic signal operation remains an open question. In this work, we develop an approach to estimatemore » traffic volume, a key input to many signal optimization algorithms, using GPS trajectory data from CV or navigation devices under low market penetration rates. To estimate traffic volumes, we model in this paper vehicle arrivals at signalized intersections as a time-dependent Poisson process, which can account for signal coordination. The estimation problem is formulated as a maximum likelihood problem given multiple observed trajectories from CVs approaching to the intersection. An expectation maximization (EM) procedure is derived to solve the estimation problem. Two case studies were conducted to validate our estimation algorithm. One uses the CV data from the Safety Pilot Model Deployment (SPMD) project, in which around 2800 CVs were deployed in the City of Ann Arbor, MI. The other uses vehicle trajectory data from users of a commercial navigation service in China. Mean absolute percentage error (MAPE) of the estimation is found to be 9–12%, based on benchmark data manually collected and data from loop detectors. Finally, considering the existing scale of CV deployments, the proposed approach could be of significant help to traffic management agencies for evaluating and operating traffic signals, paving the way of using CVs for detector-free signal operation in the future.« less

  11. Estimating traffic volumes for signalized intersections using connected vehicle data

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Zheng, Jianfeng; Liu, Henry X.

    Recently connected vehicle (CV) technology has received significant attention thanks to active pilot deployments supported by the US Department of Transportation (USDOT). At signalized intersections, CVs may serve as mobile sensors, providing opportunities of reducing dependencies on conventional vehicle detectors for signal operation. However, most of the existing studies mainly focus on scenarios that penetration rates of CVs reach certain level, e.g., 25%, which may not be feasible in the near future. How to utilize data from a small number of CVs to improve traffic signal operation remains an open question. In this work, we develop an approach to estimatemore » traffic volume, a key input to many signal optimization algorithms, using GPS trajectory data from CV or navigation devices under low market penetration rates. To estimate traffic volumes, we model in this paper vehicle arrivals at signalized intersections as a time-dependent Poisson process, which can account for signal coordination. The estimation problem is formulated as a maximum likelihood problem given multiple observed trajectories from CVs approaching to the intersection. An expectation maximization (EM) procedure is derived to solve the estimation problem. Two case studies were conducted to validate our estimation algorithm. One uses the CV data from the Safety Pilot Model Deployment (SPMD) project, in which around 2800 CVs were deployed in the City of Ann Arbor, MI. The other uses vehicle trajectory data from users of a commercial navigation service in China. Mean absolute percentage error (MAPE) of the estimation is found to be 9–12%, based on benchmark data manually collected and data from loop detectors. Finally, considering the existing scale of CV deployments, the proposed approach could be of significant help to traffic management agencies for evaluating and operating traffic signals, paving the way of using CVs for detector-free signal operation in the future.« less

  12. Operation GRITROCK: the Defence Medical Services' story and emerging lessons from supporting the UK response to the Ebola crisis.

    PubMed

    Bricknell, Martin; Hodgetts, T; Beaton, K; McCourt, A

    2016-06-01

    This paper is a record of the UK Defence Medical Services (DMS) contribution to the UK response to the Ebola crisis in West Africa from the start of planning in July 2014 to the closure of the Ministry of Defence Ebola Virus Disease Treatment Unit at the end of June 2015. The context and wider UK government decisions are summarised. This paper describes the decisions and processes that resulted in the deployment of a DMS delivered Ebola Treatment Unit in conjunction with the Department for International Development and Save the Children. It covers arrangements for medical care for disease and non-battle injury, the Air Transportable Isolator and Force Health Protection policy, and finally, considers the medical lessons from this deployment. The core message is that the UK DMS are the only part of the UK health sector that is trained, equipped, manned and available to rapidly deploy and operate a complete medical unit as part of an international response to a health crisis. Published by the BMJ Publishing Group Limited. For permission to use (where not already granted under a licence) please go to http://www.bmj.com/company/products-services/rights-and-licensing/

  13. Deployable bamboo structure project: A building life-cycle report

    NASA Astrophysics Data System (ADS)

    Firdaus, Adrian; Prastyatama, Budianastas; Sagara, Altho; Wirabuana, Revian N.

    2017-11-01

    Bamboo is considered as a sustainable material in the world of construction, and it is vastly available in Indonesia. The general utilization of the material is increasingly frequent, however, its usage as a deployable structure-a recently-developed use of bamboo, is still untapped. This paper presents a report on a deployable bamboo structure project, covering the entire building life-cycle phase. The cycle encompasses the designing; fabrication; transportation; construction; operation and maintenance; as well as a plan for future re-use. The building is made of a configuration of the structural module, each being a folding set of bars which could be reduced in size to fit into vehicles for easy transportation. Each structural module was made of Gigantochloa apus bamboo. The fabrication, transportation, and construction phase require by a minimum of three workers. The fabrication and construction phase require three hours and fifteen minutes respectively. The building is utilized as cafeteria stands, the operation and maintenance phase started since early March 2017. The maintenance plan is scheduled on a monthly basis, focusing on the inspection of the locking mechanism element and the entire structural integrity. The building is designed to allow disassembly process so that it is reusable in the future.

  14. Ground Node

    DTIC Science & Technology

    2009-09-30

    Node deployment. Original plans were to deploy directly to Fort Jefferson on Dry Tortugas (near Key West, FL). Current plans are to initially deploy...to the USCG Station on Ismoralda Key for training operations; then deploy at a to-be- determined date to Fort Jefferson on Dry Tortugas . During FY09...Dry Tortugas . NRL expects to deliver the Ground Node to Ismoralda Key in October 2009. FY09 continued the third year of providing Ground

  15. LANDSAT-D flight segment operations manual, volume 2

    NASA Technical Reports Server (NTRS)

    Varhola, J.

    1981-01-01

    Functions, performance capabilities, modes of operation, constraints, redundancy, commands, and telemetry are described for the thematic mapper; the global positioning system; the direct access S-band; the multispectral scanner; the payload correction; the thermal control subsystem; the solar array retention, deployment, and jettison assembly; and the boom antenna retention, deployment, and jettison assembly for LANDSAT 4.

  16. The Case for Treating Depression in Military Spouses

    PubMed Central

    Verdeli, Helen; Baily, Charles; Vousoura, Eleni; Belser, Alexander; Singla, Daisy; Manos, Gail

    2011-01-01

    The increased operational tempo associated with current deployments to Operation Iraqi Freedom (OIF) and Operation Enduring Freedom (OEF) is placing considerable strain on military families. Among other sequelae of OIF and OEF deployment, findings from recent studies suggest high rates of depression in spouses of service members. This review presents a rationale for targeting depression among military spouses. It examines how stressors relating to the deployment cycle may contribute to depression in spouses, and outlines the effects of spousal depression on the mental health of service members and their children. Mental health services currently available to military spouses as well as barriers to their care are also described. Considerations for the adaptation of treatment to their unique circumstances and needs are discussed. PMID:21842994

  17. Space Station tethered refueling facility operations

    NASA Technical Reports Server (NTRS)

    Kiefel, E. R.; Rudolph, L. K.; Fester, D. A.

    1986-01-01

    The space-based orbital transfer vehicle will require a large cryogenic fuel storage facility at the Space Station. An alternative to fuel storage onboard the Space Station, is on a tethered orbital refueling facility (TORF) which is separated from the Space Station by a sufficient distance to induce a gravity gradient to settle the propellants. Facility operations are a major concern associated with a tethered LO2/LH2 storage depot. A study was carried out to analyze these operations so as to identify the preferred TORF deployment direction (up or down) and whether the TORF should be permanently or intermittently deployed. The analyses considered safety, contamination, rendezvous, servicing, transportation rate, communication, and viewing. An upwardly, intermittently deployed facility is the preferred configuration for a tethered cryogenic fuel storage.

  18. The prototype fast reactor at Dounreay, Scotland. Process and engineering development for sodium removal

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Mann, A.; Herrick, R.; Gunn, J.

    2007-07-01

    Dounreay was home to commercial fast reactor development in the UK. Following the construction and operation of the Dounreay Fast Reactor, a sodium-cooled Prototype Fast Reactor (PFR), was constructed. PFR started operating in 1974, closed in 1994 and is presently being decommissioned. To date the bulk of the sodium has been removed and treated. Due to the design of the existing extraction system however, a sodium pool will remain in the heel of the reactor. To remove this sodium, a pump/camera system was developed, tested and deployed. The Water Vapour Nitrogen (WVN) process has been selected to allow removal ofmore » the final sodium residues from the reactor. Due to the design of the reactor and potential for structural damage should Normal WVN (which produces hydrated sodium hydroxide) be used, Low Concentration WVN (LC WVN) has been developed. Pilot scale testing has shown that it is possible treat the reactor within 18 months at a WVN concentration of up to 4% v/v and temperature of 120 deg. C. At present the equipment that will be used to apply LC WVN to the reactor is being developed at the detail design stage. and is expected to be deployed within the next few years. (authors)« less

  19. Parachute deploy/Release mechanism

    NASA Technical Reports Server (NTRS)

    Robelen, D. B.

    1979-01-01

    Mechanism operated by signals from single radio-control channel deploy and releases small drogue parachute from flying aircraft. Technique has uses in industrial process control and in recreational hobby applications.

  20. Self Reported Incidence and Morbidity of Acute Respiratory Illness among Deployed U.S. Military in Iraq and Afghanistan

    PubMed Central

    Soltis, Bryony W.; Sanders, John W.; Putnam, Shannon D.; Tribble, David R.; Riddle, Mark S.

    2009-01-01

    Background Historically, respiratory infections have had a significant impact on U.S. military missions. Deployed troops are particularly at high risk due to close living conditions, stressful work environments and increased exposure to pathogens. To date, there are limited data available on acute respiratory illness (ARI) among troops deployed in support of ongoing military operations, specifically Operation Enduring Freedom (OEF) and Operation Iraqi Freedom (OIF). Methods Using self-report data from two sources collected from troops deployed to Iraq, Afghanistan and the surrounding region, we analyzed incidence and risk factors for ARI. Military personnel on mid-deployment Rest & Recuperation (R&R) or during redeployment were eligible to participate in the voluntary self-report survey. Results Overall, 39.5% reported having at least one ARI. Of these, 18.5% sought medical care and 33.8% reported having decreased job performance. The rate of self-reported ARI was 15 episodes per 100 person-months among those taking the voluntary survey, and 24.7 episodes per 100 person-months among those taking the clinic health questionnaire. Negative binomial regression analysis found female sex, Navy branch of service and lack of flush toilets to be independently associated with increased rates of ARI. Deployment to OIF, increasing age and higher rank were also positively associated with ARI risk. Conclusions The overall percentage of deployed military personnel reporting at least one acute respiratory illness decreased since earlier parts of OIF/OEF. However, the reported effect on job performance increased tremendously. The most important factors associated with increased respiratory infection are female sex, Navy branch of service, lack of improved latrine facilities, deployment to OIF, increasing age and higher rank. PMID:19584919

  1. Structural Design Considerations for a 50 kW-Class Solar Array for NASA's Asteroid Redirect Mission

    NASA Technical Reports Server (NTRS)

    Kerslake, Thomas W.; Kraft, Thomas G.; Yim, John T.; Le, Dzu K.

    2016-01-01

    NASA is planning an Asteroid Redirect Mission (ARM) to take place in the 2020s. To enable this multi-year mission, a 40 kW class solar electric propulsion (SEP) system powered by an advanced 50 kW class solar array will be required. Powered by the SEP module (SEPM), the ARM vehicle will travel to a large near-Earth asteroid, descend to its surface, capture a multi-metric ton (t) asteroid boulder, ascend from the surface and return to the Earth-moon system to ultimately place the ARM vehicle and its captured asteroid boulder into a stable distant orbit. During the years that follow, astronauts flying in the Orion multipurpose crew vehicle (MPCV) will dock with the ARM vehicle and conduct extra-vehicular activity (EVA) operations to explore and sample the asteroid boulder. This paper will review the top structural design considerations to successfully implement this 50 kW class solar array that must meet unprecedented performance levels. These considerations include beyond state-of-the-art metrics for specific mass, specific volume, deployed area, deployed solar array wing (SAW) keep in zone (KIZ), deployed strength and deployed frequency. Analytical and design results are presented that support definition of stowed KIZ and launch restraint interface definition. An offset boom is defined to meet the deployed SAW KIZ. The resulting parametric impact of the offset boom length on spacecraft moment of inertias and deployed SAW quasistatic and dynamic load cases are also presented. Load cases include ARM spacecraft thruster plume impingement, asteroid surface operations and Orion docking operations which drive the required SAW deployed strength and damping. The authors conclude that to support NASA's ARM power needs, an advanced SAW is required with mass performance better than 125 W/kg, stowed volume better than 40 kW/cu m, a deployed area of 200 sq m (100 sq m for each of two SAWs), a deployed SAW offset distance of nominally 3-4 m, a deployed SAW quasistatic strength of nominally 0.1 g in any direction, a deployed loading displacement under 2 m, a deployed fundamental frequency above 0.1 Hz and deployed damping of at least 1%. These parameters must be met on top of challenging mission environments and ground testing requirements unique to the ARM project.

  2. Posttraumatic Stress and Physical Health Functioning: Moderating Effects of Deployment and Postdeployment Social Support in OEF/OIF/OND Veterans

    PubMed Central

    Luciano, Matthew T.; McDevitt-Murphy, Meghan E.

    2016-01-01

    Research indicates that posttraumatic stress disorder (PTSD) is strongly associated with physical health difficulties, and that social support may be protective for both problems. Social support, however, is often broadly conceptualized. The present analysis explores how Veteran-specific social support (during military deployment and postdeployment) may moderate the relationship between PTSD and physical health functioning. Participants were recruited from a VA Medical Center. Self-report data was analyzed from 63 Veterans (17.46% female; 42.86% White) who had been deployed in support of Operation Enduring Freedom, Operation Iraqi Freedom, and Operation New Dawn (OEF/OIF/OND). Data indicate that military deployment social support moderated the relationship between PTSD and pain (β = .02, p = .02) while postdeployment social support moderated the relationship between PTSD and general health perceptions (β = .03, p = .01). These findings may be used to better understand the role of support in influencing psychological and physiological processes. PMID:27660993

  3. Training the combat and operational stress control dog: an innovative modality for behavioral health.

    PubMed

    Krol, William

    2012-01-01

    Combat and operational stress control (COSC) dogs represent a new category of military working dog. America's VetDogs, a nongovernmental, not-for-profit organization, trains and provides therapy dogs to work with the US Army's combat and operational stress control teams deployed to Afghanistan or Iraq. By taking the therapy/service dog concept to the next level, these dogs have become an important modality in the Army's initiative to safeguard Soldiers' behavioral health while deployed, allowing COSC unit members to break down stigmas that are still present when dealing with behavioral health issues. The training process begins by choosing a pool of dogs, exposing them to different sensory experiences over several months, and training the primary and secondary handlers who will be responsible for the dogs while deployed in theater. After their deployment ends, the dogs are retrained by America's VetDogs to further serve in military or Veterans Administration medical centers as physical, occupational, or behavioral therapy dogs.

  4. Combat science: the emergence of Operational Research in World War II.

    PubMed

    Rau, Erik P

    2005-12-01

    World War II became known as the "wizard war" because the cycles of developing countermeasures and counter-countermeasures to the weapons deployed by all sides drove rapid technological change. However, technological innovation was not the only contribution scientists made to the war effort. Through Operational Research (OR)--the scientific scrutiny of new weapons, their deployment and relative efficiency--scientists also influenced how warfare itself was conducted. This new scientific field emerged in the UK, where it helped to tighten the defense against the Luftwaffe. It quickly spread to other aspects of the military machine, improving both antisubmarine campaigns and bombing strategy. But although this analytical approach to warfare offered military commanders a factual basis on which to base difficult decisions and deal with tactical and strategic uncertainty, it was not without controversy. Indeed, several recommendations that came out of OR sparked disputes over the allocation of resources and strategic priorities.

  5. Axel Robotic Platform for Crater and Extreme Terrain Exploration

    NASA Technical Reports Server (NTRS)

    Nesnas, Issa A.; Matthews, Jaret B.; Edlund, Jeffrey A.; Burdick, Joel W.; Abad-Manterola, Pablo

    2012-01-01

    To be able to conduct science investigations on highly sloped and challenging terrains, it is necessary to deploy science payloads to such locations and collect and process in situ samples. A tethered robotic platform has been developed that is capable of exploring very challenging terrain. The Axel rover is a symmetrical rover that is minimally actuated, can traverse arbitrary paths, and operate upside-down or right-side up. It can be deployed from a larger platform (rover, lander, or aerobot) or from a dual Axel configuration. Axel carries and manages its own tether, reducing damage to the tether during operations. Fundamentally, Axel is a two-wheeled rover with a symmetric body and a trailing link. Because the primary goal is minimal complexity, this version of the Axel rover uses only four primary actuators to control its wheels, tether, and a trailing link. A fifth actuator is used for level winding of tether onto Axel s spool.

  6. Caffeine and energy drink use by combat arms soldiers in Afghanistan as a countermeasure for sleep loss and high operational demands.

    PubMed

    McLellan, Tom M; Riviere, Lyndon A; Williams, Kelly W; McGurk, Dennis; Lieberman, Harris R

    2018-03-11

    Combat deployments are characterized by high operational demands with limited opportunities for sleep leading to fatigue and degraded cognitive and operational performance. Caffeine in moderate doses is recognized as an effective intervention for physical and cognitive decrements associated with sleep loss. This report is based on data collected by two separate, independently conducted surveys administered in Afghanistan in 2011-2012. It assessed caffeine use and sleep disruption among U.S. Army combat soldiers (J-MHAT 8; n = 518) and among deployed soldiers with different military assignments (USARIEM Deployment Survey; n = 260). Daily caffeine intake assessed in the J-MHAT 8 survey averaged 404 ± 18 mg. In the USARIEM Deployment Survey, intake was 303 ± 29 mg and was significantly higher among combat arms soldiers (483 ± 100 mg) compared to combat service support personnel (235 ± 23 mg). In both surveys, over 55% of total caffeine intake was from energy drinks. Additional sources of caffeine included coffee, tea, sodas, gum, candy, and over-the-counter medications. Higher caffeine intake was not associated with ability to fall asleep at night or wake-up in the morning (J-MHAT 8 survey). Higher caffeine consumption was associated with disrupted sleep from high operational tempo and nighttime duties of combat operations. Overall caffeine consumption and energy drink use in Afghanistan was greater than among non-deployed soldiers and civilians. Caffeine was frequently used as a countermeasure during night operations to offset adverse effects of sleep loss on physical and cognitive function, consistent with current Department of the Army recommendations.

  7. Precise time technology for selected Air Force systems: Present status and future requirements

    NASA Technical Reports Server (NTRS)

    Yannoni, N. F.

    1981-01-01

    Precise time and time interval (PTTI) technology is becoming increasingly significant to Air Force operations as digital techniques find expanded utility in military missions. Timing has a key role in the function as well as in navigation. A survey of the PTTI needs of several Air Force systems is presented. Current technology supporting these needs was reviewed and new requirements are emphasized for systems as they transfer from initial development to final operational deployment.

  8. Medical Surveillance Monthly Report (MSMR). Volume 14, Number 6, September/October 2007

    DTIC Science & Technology

    2007-10-01

    can signifi cantly impact the health, well-being and operational eff ectiveness of service members and their units. Th e U.S. military has developed...Young AJ. Sustaining health and performance in cold weather operations. Technical note no. TN/02-2. US Army Research Institute of Environmental ... assesment forms, U.S. Armed Forces, October 2006-September 2007 fourths (73.5%) of deployers rated their “health in general” as “excellent” or

  9. Pilot Deployment of the LDSD Parachute via a Supersonic Ballute

    NASA Technical Reports Server (NTRS)

    Tanner, Christopher L.; O'Farrell, Clara; Gallon, John C.; Clark, Ian G.; Witkowski, Allen; Woodruff, Paul

    2015-01-01

    The Low Density Supersonic Decelerator (LDSD) Project required the use of a pilot system due to the inability to mortar deploy its main supersonic parachute. A mortar deployed 4.4 m diameter supersonic ram-air ballute was selected as the pilot system for its high drag coefficient and stability relative to candidate supersonic parachutes at the targeted operational Mach number of 3. The ballute underwent a significant development program that included the development of a new liquid methanol-based pre-inflation system to assist the ballute inflation process. Both pneumatic and pyrotechnic mortar tests were conducted to verify orderly rigging deployment, bag strip, inflation aid activation, and proper mortar performance. The ballute was iteratively analyzed between fluid and structural analysis codes to obtain aerodynamic and aerothermodynamic estimates as well as estimates of the ballute's structural integrity and shape. The ballute was successfully flown in June 2014 at a Mach number of 2.73 as part of the first LDSD supersonic flight test and performed beyond expectations. Recovery of the ballute indicated that it did not exceed its structural or thermal capabilities. This flight set a historical precedent as it represented the largest ballute to have ever been successfully flown at this Mach number by a NASA entity.

  10. IUS/TUG orbital operations and mission support study. Volume 3: Space tug operations

    NASA Technical Reports Server (NTRS)

    1975-01-01

    A study was conducted to develop space tug operational concepts and baseline operations plan, and to provide cost estimates for space tug operations. Background data and study results are presented along with a transition phase analysis (the transition from interim upper state to tug operations). A summary is given of the tug operational and interface requirements with emphasis on the on-orbit checkout requirements, external interface operational requirements, safety requirements, and system operational interface requirements. Other topics discussed include reference missions baselined for the tug and details for the mission functional flows and timelines derived for the tug mission, tug subsystems, tug on-orbit operations prior to the tug first burn, spacecraft deployment and retrieval by the tug, operations centers, mission planning, potential problem areas, and cost data.

  11. Structural design of the Large Deployable Reflector (LDR)

    NASA Technical Reports Server (NTRS)

    Satter, Celeste M.; Lou, Michael C.

    1991-01-01

    An integrated Large Deployable Reflector (LDR) analysis model was developed to enable studies of system responses to the mechanical and thermal disturbances anticipated during on-orbit operations. Functional requirements of the major subsystems of the LDR are investigated, design trades are conducted, and design options are proposed. System mass and inertia properties are computed in order to estimate environmental disturbances, and in the sizing of control system hardware. Scaled system characteristics are derived for use in evaluating launch capabilities and achievable orbits. It is concluded that a completely passive 20-m primary appears feasible for the LDR from the standpoint of both mechanical vibration and thermal distortions.

  12. Structural design of the Large Deployable Reflector (LDR)

    NASA Astrophysics Data System (ADS)

    Satter, Celeste M.; Lou, Michael C.

    1991-09-01

    An integrated Large Deployable Reflector (LDR) analysis model was developed to enable studies of system responses to the mechanical and thermal disturbances anticipated during on-orbit operations. Functional requirements of the major subsystems of the LDR are investigated, design trades are conducted, and design options are proposed. System mass and inertia properties are computed in order to estimate environmental disturbances, and in the sizing of control system hardware. Scaled system characteristics are derived for use in evaluating launch capabilities and achievable orbits. It is concluded that a completely passive 20-m primary appears feasible for the LDR from the standpoint of both mechanical vibration and thermal distortions.

  13. Distributed Monitoring Infrastructure for Worldwide LHC Computing Grid

    NASA Astrophysics Data System (ADS)

    Andrade, P.; Babik, M.; Bhatt, K.; Chand, P.; Collados, D.; Duggal, V.; Fuente, P.; Hayashi, S.; Imamagic, E.; Joshi, P.; Kalmady, R.; Karnani, U.; Kumar, V.; Lapka, W.; Quick, R.; Tarragon, J.; Teige, S.; Triantafyllidis, C.

    2012-12-01

    The journey of a monitoring probe from its development phase to the moment its execution result is presented in an availability report is a complex process. It goes through multiple phases such as development, testing, integration, release, deployment, execution, data aggregation, computation, and reporting. Further, it involves people with different roles (developers, site managers, VO[1] managers, service managers, management), from different middleware providers (ARC[2], dCache[3], gLite[4], UNICORE[5] and VDT[6]), consortiums (WLCG[7], EMI[11], EGI[15], OSG[13]), and operational teams (GOC[16], OMB[8], OTAG[9], CSIRT[10]). The seamless harmonization of these distributed actors is in daily use for monitoring of the WLCG infrastructure. In this paper we describe the monitoring of the WLCG infrastructure from the operational perspective. We explain the complexity of the journey of a monitoring probe from its execution on a grid node to the visualization on the MyWLCG[27] portal where it is exposed to other clients. This monitoring workflow profits from the interoperability established between the SAM[19] and RSV[20] frameworks. We show how these two distributed structures are capable of uniting technologies and hiding the complexity around them, making them easy to be used by the community. Finally, the different supported deployment strategies, tailored not only for monitoring the entire infrastructure but also for monitoring sites and virtual organizations, are presented and the associated operational benefits highlighted.

  14. Deploying and operating integrated intelligent transportation systems : twenty questions and answers : guidance from the evaluation of the Metropolitan Model Deployment Initiative sites

    DOT National Transportation Integrated Search

    2000-01-01

    This report describes the results of a major data gathering effort aimed at tracking deployment of nine infrastructure components of the metropolitan ITS infrastructure in 78 of the largest metropolitan areas in the nation. The nine components are: F...

  15. A cabled acoustic telemetry system for detecting and tracking juvenile salmon: Part 1. Engineering design and instrumentation

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Weiland, Mark A.; Deng, Zhiqun; Seim, Thomas A.

    2011-05-26

    The U.S. Army Corps of Engineers-Portland District started development of the Juvenile Salmon Acoustic Telemetry System (JSATS), a nonproprietary technology, in 2001 to meet the needs for monitoring the survival of juvenile salmonids through the 31 federal dams in the Federal Columbia River Power System (FCRPS). Initial development focused on coded acoustic microtransmitters, and autonomous receivers that could be deployed in open reaches of the river for detection of the juvenile salmonids implanted with microtransmitters as they passed the autonomous receiver arrays. In 2006 the Pacific Northwest National Laboratory (PNNL) was tasked with development of an acoustic receiver system formore » deployment at hydropower facilities (cabled receiver) for detecting fish tagged with microtransmitters as well as tracking them in 2 or 3-dimensions as the fish passed at the facility for determining route of passage. The additional route of passage information, combined with survival estimates, is used by the dam operators and managers to make structural and operational changes at the hydropower facilities to improve survival of fish as they pass the facilities and through the FCRPS.« less

  16. New Web Services for Broader Access to National Deep Submergence Facility Data Resources Through the Interdisciplinary Earth Data Alliance

    NASA Astrophysics Data System (ADS)

    Ferrini, V. L.; Grange, B.; Morton, J. J.; Soule, S. A.; Carbotte, S. M.; Lehnert, K.

    2016-12-01

    The National Deep Submergence Facility (NDSF) operates the Human Occupied Vehicle (HOV) Alvin, the Remotely Operated Vehicle (ROV) Jason, and the Autonomous Underwater Vehicle (AUV) Sentry. These vehicles are deployed throughout the global oceans to acquire sensor data and physical samples for a variety of interdisciplinary science programs. As part of the EarthCube Integrative Activity Alliance Testbed Project (ATP), new web services were developed to improve access to existing online NDSF data and metadata resources. These services make use of tools and infrastructure developed by the Interdisciplinary Earth Data Alliance (IEDA) and enable programmatic access to metadata and data resources as well as the development of new service-driven user interfaces. The Alvin Frame Grabber and Jason Virtual Van enable the exploration of frame-grabbed images derived from video cameras on NDSF dives. Metadata available for each image includes time and vehicle position, data from environmental sensors, and scientist-generated annotations, and data are organized and accessible by cruise and/or dive. A new FrameGrabber web service and service-driven user interface were deployed to offer integrated access to these data resources through a single API and allows users to search across content curated in both systems. In addition, a new NDSF Dive Metadata web service and service-driven user interface was deployed to provide consolidated access to basic information about each NDSF dive (e.g. vehicle name, dive ID, location, etc), which is important for linking distributed data resources curated in different data systems.

  17. Lifetime Prevalence of Respiratory Diseases and Exposures Among Veterans of Operation Enduring Freedom and Operation Iraqi Freedom Veterans

    PubMed Central

    Barth, Shannon K.; Dursa, Erin K.; Bossarte, Robert; Schneiderman, Aaron

    2017-01-01

    Objective The objective of this study was to determine the prevalence of respiratory exposures and the association between respiratory exposures and respiratory disease among veterans deployed to Operation Enduring Freedom and Operation Iraqi Freedom (OEF/OIF) compared with nondeployed veterans of this era. Methods Data come from a national health survey of 20,563 deployed and nondeployed OEF/OIF era veterans. Prevalence estimates and adjusted odds ratios were calculated. Results were weighted to represent the population. Results Prevalence of at least one respiratory exposure was high among both deployed and nondeployed groups (95% and 70%, respectively). In both groups, those with any respiratory exposure were at an increased risk for reporting a respiratory disease. Conclusion Respiratory exposures are highly prevalent and are associated with increased odds of respiratory diseases among the OEF/OIF era population. PMID:27930474

  18. DOE Office of Scientific and Technical Information (OSTI.GOV)

    VANNONI, MICHAEL G.; BIRINGER, KENT L.; TROST, LAWRENCE C.

    Missiles are attractive weapon systems because of their flexibility, survivability, and relatively low cost. Consequently, many nations are seeking to build missile forces resulting in regional arms races. Missile forces can be both stabilizing (e.g., providing a survivable force for deterrence) and destabilizing (e.g., creating strategic asymmetries). Efforts to control missile proliferation must account for these effects. A number of strategies to control the destabilizing effects of missiles were developed during the Cold War. Some of these strategies are applicable to regional missile control but new approaches, tailored to regional geographic and security conditions, are needed. Regional missile nonproliferation canmore » be pursued in a variety of ways: Reducing the demand for missiles by decreasing the perception of national threats; Restricting the export of missiles and associated equipment by supplier countries; Restricting information describing missile technology; Limiting missile development activities such as flight or engine tests; Restricting the operational deployment of existing missile forces; and Reducing existing missile forces by number and/or type. Even when development is complete, limits on deployment within range of potential targets or limits on operational readiness can help stabilize potential missile confrontations. Implementing these strategies often involves the collection and exchange of information about activities related to missile development or deployment. Monitoring is the process of collecting information used to for subsequent verification of commitments. A systematic approach to implementing verification is presented that identifies areas where monitoring could support missile nonproliferation agreements. The paper presents both non-technical and technical techniques for monitoring. Examples of non-technical techniques are declarations about planned test launches or on-site inspections. Examples of technical monitoring include remote monitoring (i.e., a sensor that is physically present at a facility) and remote sensing (i.e., a sensor that records activity without being physically present at a facility).« less

  19. Airbag retraction

    NASA Technical Reports Server (NTRS)

    1997-01-01

    This image shows that the Mars Pathfinder airbags have been successfully retracted, allowing safe deployment of the rover ramps. The Sojourner rover, still in its deployed position, is at center image, and rocks are visible in the background. Mars Pathfinder landed successfully on the surface of Mars today at 10:07 a.m. PDT.

    Mars Pathfinder is the second in NASA's Discovery program of low-cost spacecraft with highly focused science goals. The Jet Propulsion Laboratory, Pasadena, CA, developed and manages the Mars Pathfinder mission for NASA's Office of Space Science, Washington, D.C. JPL is an operating division of the California Institute of Technology (Caltech). The Imager for Mars Pathfinder (IMP) was developed by the University of Arizona Lunar and Planetary Laboratory under contract to JPL. Peter Smith is the Principal Investigator.

  20. Research on the Use of Robotics in Hazardous Environments at Sandia National Laboratories

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kwok, Kwan S.

    Many hazardous material handling needs exist in remote unstructured environments. Currently these operations are accomplished using personnel in direct contact with the hazards. A safe and cost effective alternative to this approach is the use of intelligent robotic systems for safe handling, packaging, transport, and even excavation of hazardous materials. The Intelligent Systems and Robotics Center of Sandia National Laboratories has developed and deployed robotic technologies for use in hazardous environments, three of which have been deployed in DOE production facilities for handling of special nuclear materials. Other systems are currently under development for packaging special nuclear materials. This papermore » presents an overview of the research activities, including five delivered systems, at %ndia National Laboratories on the use of robotics in hazardous environments.« less

  1. A Female Urinary Diversion Device for Military Women in the Deployed Environment

    DTIC Science & Technology

    2016-10-27

    Deployment Survey” at 3 and 6 months during deployment. Sample: MW (n = 94) deployed for ≥ 6 months to austere locations in support of Operation Enduring...provided support for the FUDD’s utility in austere environments. Clinically significant differences in urinary symptoms between groups were determined...This research provides scientifically based support for the FUDD’s feasibility for MW in austere settings and clinical support for the FUDD as a

  2. Longitudinal Assessment of Self-Reported Recent Back Pain and Combat Deployment in the Millennium Cohort Study.

    PubMed

    Granado, Nisara S; Pietrucha, Amanda; Ryan, Margaret; Boyko, Edward J; Hooper, Tomoko I; Smith, Besa; Smith, Tyler C

    2016-11-15

    A prospective cohort study. Activities performed during military operations vary in complexity and physical demand. The risk for mental illness following military combat deployment has been well documented. However, information regarding the possible contribution of back pain to decreased mental and functional health is scarce. To our knowledge, this is the first study to prospectively assess deployment and self-reported recent back pain in a population-based U.S. military cohort. The study consisted of Millennium Cohort participants who were followed for the development of back pain for an average of 3.9 years. Descriptive statistics and longitudinal analyses were used to assess the temporal relationship of deployment with self-reported recent back pain at follow-up (N = 53,933). Recent back pain was self-reported by 8379 (15.5%) participants at follow-up. After adjusting for covariates, deployers with combat experiences had higher odds [odds ratio (OR) = 1.38, 95% confidence interval (95% CI): 1.28-1.50] of recent back pain than noncombat deployers. There was no association between recent back pain and nondeployers compared with noncombat deployers. Service support/supply handlers were at an increased odds of reporting recent back pain (OR = 1.11, 95% CI: 1.02-1.21) than functional support/administration occupations. Occupations associated with a physically demanding work environment had a higher risk of back pain. Deployers with combat experiences were more likely to report back pain postdeployment. This well-defined group of military personnel may potentially benefit from integrated prevention efforts. 3.

  3. Spatial distribution and deployment of community-based distributors implementing integrated community case management (iCCM): Geographic information system (GIS) mapping study in three South Sudan states.

    PubMed

    Pratt, Abigail; Dale, Martin; Olivi, Elena; Miller, Jane

    2014-12-01

    In late 2012 and in conjunction with South Sudan's Ministry of Health - National Malaria Control Program, PSI (Population Services International) conducted a comprehensive mapping exercise to assess geographical coverage of its integrated community case management (iCCM) program and consider scope for expansion. The operational research was designed to provide evidence and support for low-cost mapping and monitoring systems, demonstrating the use of technology to enhance the quality of programming and to allow for the improved allocation of resources through appropriate and need-based deployment of community-based distributors (CBDs). The survey took place over the course of three months and program staff gathered GPS (global positioning system) data, along with demographic data, for over 1200 CBDs and 111 CBD supervisors operating in six counties in South Sudan. Data was collated, cleaned and quality assured, input into an Excel database, and subsequently uploaded to geographic information system (GIS) for spatial analysis and map production. The mapping results showed that over three-quarters of CBDs were deployed within a five kilometer radius of a health facility or another CBD, contrary to program planning and design. Other characteristics of the CBD and CBD supervisor profiles (age, gender, literacy) were more closely matched with other regional programs. The results of this mapping exercise provided a valuable insight into the contradictions found between a program "deployment plan" and the realities observed during field implementation. It also highlighted an important need for program implementers and national-level strategy makers to consider the natural and community-driven diffusion of CBDs, and take into consideration the strength of the local health facilities when developing a deployment plan.

  4. A Data Analytical Framework for Improving Real-Time, Decision Support Systems in Healthcare

    ERIC Educational Resources Information Center

    Yahav, Inbal

    2010-01-01

    In this dissertation we develop a framework that combines data mining, statistics and operations research methods for improving real-time decision support systems in healthcare. Our approach consists of three main concepts: data gathering and preprocessing, modeling, and deployment. We introduce the notion of offline and semi-offline modeling to…

  5. High temperature electronics applications in space exploration

    NASA Technical Reports Server (NTRS)

    Jurgens, R. F.

    1981-01-01

    The extension of the range of operating temperatures of electronic components and systems for planetary exploration is examined. In particular, missions which utilize balloon-borne instruments to study the Venusian and Jovian atmospheres are discussed. Semiconductor development and devices including power sources, ultrastable oscillators, transmitters, antennas, electromechanical devices, and deployment systems are addressed.

  6. Mosquito and filth fly control in desert and temperate environments with a synergized pesticide mister and barrier treatment

    USDA-ARS?s Scientific Manuscript database

    U.S. military operations face significant negative impacts on mission readiness from disease-vector and nuisance filth flies, mosquitoes, and sand flies. Through the Deployed War Fighter Protection Program (DWFP) we previously developed small scale 9 ft by 3 ft pesticide-treated perimeters enhanced ...

  7. RuCool Operational Oceanography: Using a Fleet of Autonomous Ocean Gliders

    NASA Astrophysics Data System (ADS)

    Graver, J.; Jones, C.; Glenn, S.; Kohut, J.; Schofield, O.; Roarty, H.; Aragon, D.; Kerfoot, J.; Haldeman, C.; Yan, A.

    2007-05-01

    At the Rutgers University Coastal Ocean Observation Lab (RU-COOL), we have constructed a shelf-wide ocean observatory to characterize the physical forcing of continental shelf primary productivity in the New York Bight (NYB). The system is anchored by four enabling technologies, which include the international constellation of ocean color satellites, multi-static high frequency long-range surface current radar, real-time telemetry moorings, and long duration autonomous underwater vehicles (AUVs). Operation of the observatory is through a centralized computer network dedicated to receiving, processing and visualizing the real-time data and then disseminating results to both field scientists and ocean forecasters over the World Wide Web. The system was designed to conduct cutting edge research requiring the addition of rapidly evolving technologies, and to serve society by providing sustained data delivered in real-time. Rutgers COOL continues to work closely with Webb Research Corporation (WRC) in testing and development of the Slocum underwater gliders and continues to apply Slocum gliders in field operations spanning the globe. The continued strong collaboration between WRC and Rutgers has led to advances in glider operations and applications. These include deployment/recovery techniques, improvements in durability and reliability, integrated sensors suites, salinity spike removal, and adaptive controls utilized to optimize mission goals and data return. The gliders have gathered numerous data sets including salt intrusions as seen off of New Jersey, plume tracking, biological water sample matching, and operation through Hurricane Ernesto in 2006. This talk will detail recent oceanographic experiments in which the fleet has been deployed and improvements in the operation of these novel robotic vehicles. These experiments, in locations around the world, have resulted in significant new work in operation of underwater gliders and have gathered new and unique data sets. Recent accomplishments include deployment of a glider in Antarctica for LTER, control of a fleet of gliders during the ONR sponsored Shallow Water 06, RIMPAC, LATTE, ASAP, and the continuation of long-term observation at the LEO-15 New Jersey site Endurance Line. To date Rutgers has flown close to 100 glider missions, with over 27,000 km flown over 760 calendar days and 1,350 glider days in the water. Operations around the world are orchestrated remotely from COOL at Rutgers. Computer networking allows for command and control of the glider fleet from the COOL Lab or remotely via the internet. This system has enabled new oceanographic experiments at significantly reduced cost, with increased reliability, and with extended continuous operational deployments in the global oceans since 2003.

  8. Accelerating Industrial Adoption of Metal Additive Manufacturing Technology

    NASA Astrophysics Data System (ADS)

    Vartanian, Kenneth; McDonald, Tom

    2016-03-01

    While metal additive manufacturing (AM) technology has clear benefits, there are still factors preventing its adoption by industry. These factors include the high cost of metal AM systems, the difficulty for machinists to learn and operate metal AM machines, the long approval process for part qualification/certification, and the need for better process controls; however, the high AM system cost is the main barrier deterring adoption. In this paper, we will discuss an America Makes-funded program to reduce AM system cost by combining metal AM technology with conventional computerized numerical controlled (CNC) machine tools. Information will be provided on how an Optomec-led team retrofitted a legacy CNC vertical mill with laser engineered net shaping (LENS®—LENS is a registered trademark of Sandia National Labs) AM technology, dramatically lowering deployment cost. The upgraded system, dubbed LENS Hybrid Vertical Mill, enables metal additive and subtractive operations to be performed on the same machine tool and even on the same part. Information on the LENS Hybrid system architecture, learnings from initial system deployment and continuing development work will also be provided to help guide further development activities within the materials community.

  9. A deployable telescope for sub-meter resolutions from microsatellite platforms

    NASA Astrophysics Data System (ADS)

    Dolkens, D.; Kuiper, J. M.

    2017-11-01

    Sub-meter resolution imagery has become increasingly important for disaster response, defence and security applications. Earth Observation (EO) at these resolutions has long been the realm of large and heavy telescopes, which results in high image costs, limited availability and long revisit times. Using synthetic aperture technology, instruments can now be developed that can reach these resolutions using a substantially smaller launch volume and mass. To obtain a competitive MicroSatellite telescope design, a concept study was performed to develop a deployable instrument that can reach a ground resolution of 25 cm from an orbital altitude of 500 km. Two classes of instruments were analysed: the Fizeau synthetic aperture, a telescope that uses a segmented primary mirror, and a Michelson synthetic aperture, an instrument concept that combines the light of a distributed array of afocal telescopes into a final image. In a trade-off the Fizeau synthetic aperture was selected as the most promising concept for obtaining high resolution imagery from a Low Earth Orbit. The optical design of the Fizeau synthetic aperture is based on a full-field Korsch telescope that has been optimized for compactness and an excellent wavefront quality. It uses three aperture segments in a tri-arm configuration that can be folded alongside the instrument during launch. The secondary mirror is mounted on a deployable boom, further decreasing the launch volume. To maintain a high image quality while operating in the harsh and dynamic space environment, one of the most challenging obstacles that must be addressed is the very tight tolerance on the positioning of the three primary mirror segments and the secondary mirror. Following a sensitivity analysis, systems engineering budgets have been defined. The instrument concept features a robust thermo-mechanical design, aimed at reducing the mechanical uncertainties to a minimum. Silicon Carbide mirror segments, the use of Invar for the deployable arms and a main housing with active thermal control, will guarantee a high thermal stability during operations. Since a robust mechanical design alone is insufficient to ensure a diffraction limited performance, an inorbit calibration system was developed. Post launch, a combination of interferometric measurements and capacitive sensors will be used to characterise the system. Actuators beneath the primary mirror segments will then correct the position of the mirror segments to meet the required operating accuracies. During operations, a passive system will be used. This system relies on a phase diversity algorithm to retrieve residual wavefront aberrations and deconvolve the image data. Using this approach, a good end-to-end imaging performance can be achieved.

  10. Extravehicular Activity Operations Concepts Under Communication Latency and Bandwidth Constraints

    NASA Technical Reports Server (NTRS)

    Beaton, Kara H.; Chappell, Steven P.; Abercromby, Andrew F. J.; Miller, Matthew J.; Nawotniak, Shannon Kobs; Hughes, Scott; Brady, Allyson; Lim, Darlene S. S.

    2017-01-01

    The Biologic Analog Science Associated with Lava Terrains (BASALT) project is a multi-year program dedicated to iteratively develop, implement, and evaluate concepts of operations (ConOps) and supporting capabilities intended to enable and enhance human scientific exploration of Mars. This pa-per describes the planning, execution, and initial results from the first field deployment, referred to as BASALT-1, which consisted of a series of 10 simulated extravehicular activities (EVAs) on volcanic flows in Idaho's Craters of the Moon (COTM) National Monument. The ConOps and capabilities deployed and tested during BASALT-1 were based on previous NASA trade studies and analog testing. Our primary research question was whether those ConOps and capabilities work acceptably when performing real (non-simulated) biological and geological scientific exploration under 4 different Mars-to-Earth communication conditions: 5 and 15 min one-way light time (OWLT) communication latencies and low (0.512 Mb/s uplink, 1.54 Mb/s downlink) and high (5.0 Mb/s uplink, 10.0 Mb/s downlink) bandwidth conditions representing the lower and higher limits of technical communication capabilities currently proposed for future human exploration missions. The synthesized results of BASALT-1 with respect to the ConOps and capabilities assessment were derived from a variety of sources, including EVA task timing data, network analytic data, and subjective ratings and comments regarding the scientific and operational acceptability of the ConOp and the extent to which specific capabilities were enabling and enhancing, and are presented here. BASALT-1 established preliminary findings that baseline ConOp, software systems, and communication protocols were scientifically and operationally acceptable with minor improvements desired by the "Mars" extravehicular (EV) and intravehicular (IV) crewmembers, but unacceptable with improvements required by the "Earth" Mission Support Center. These data will provide a basis for guiding and prioritizing capability development for future BASALT deployments and, ultimately, future human exploration missions.

  11. Sentinel-1 SAR Deployment Testing- Lessons Learned

    NASA Astrophysics Data System (ADS)

    Schwarz, Sebastian; Alberti, Mathias V.

    2015-09-01

    On April 3rd 2014, ESA has launched the Sentinel-1A spacecraft with its SAR instrument payload. During the first 12 hours in space, the antenna was released and successfully deployed to its operational configuration. Almost 6 years before that date, the first conceptual considerations regarding integration, alignment and on- ground deployment testing took place. Starting in these early phases of the project, the paper contains an overview of the concepts and trades which were performed to identify the most suitable off-loading MGSE for this heavy and fragile antenna. Following that, the challenges and lessons learned during the different developments of this test setup are discussed. This includes MGSE specific topics, such as the minimization of structural deformation under load or the optimization of the pulley arrangement as result of a coupled multibody analysis. On the other hand, load and deformation control strategies for the flight hardware, as well as safety related aspects are covered.

  12. Recent Advances in the Tempest UAS for In-Situ Measurements in Highly-Dynamic Environments

    NASA Astrophysics Data System (ADS)

    Argrow, B. M.; Frew, E.; Houston, A. L.; Weiss, C.

    2014-12-01

    The spring 2010 deployment of the Tempest UAS during the VORTEX2 field campaign verified that a small UAS, supported by a customized mobile communications, command, and control (C3) architecture, could simultaneously satisfy Federal Aviation Administration (FAA) airspace requirements, and make in-situ thermodynamic measurements in supercell thunderstorms. A multi-hole airdata probe was recently integrated into the Tempest UAS airframe and verification flights were made in spring 2013 to collect in-situ wind measurements behind gust fronts produced by supercell thunderstorms in northeast Colorado. Using instantaneous aircraft attitude estimates from the autopilot, the in-situ measurements were converted to inertial wind estimates, and estimates of uncertainty in the wind measurements was examined. To date, the limited deployments of the Tempest UAS have primarily focused on addressing the engineering and regulatory requirements to conduct supercell research, and the Tempest UAS team of engineers and meteorologists is preparing for deployments with the focus on collecting targeted data for meteorological exploration and hypothesis testing. We describe the recent expansion of the operations area and altitude ceiling of the Tempest UAS, engineering issues for accurate inertial wind estimates, new concepts of operation that include the simultaneous deployment of multiple aircraft with mobile ground stations, and a brief description of our current effort to develop a capability for the Tempest UAS to perform autonomous path planning to maximize energy harvesting from the local wind field for increased endurance.

  13. Multidisciplinary Optimization Approach for Design and Operation of Constrained and Complex-shaped Space Systems

    NASA Astrophysics Data System (ADS)

    Lee, Dae Young

    The design of a small satellite is challenging since they are constrained by mass, volume, and power. To mitigate these constraint effects, designers adopt deployable configurations on the spacecraft that result in an interesting and difficult optimization problem. The resulting optimization problem is challenging due to the computational complexity caused by the large number of design variables and the model complexity created by the deployables. Adding to these complexities, there is a lack of integration of the design optimization systems into operational optimization, and the utility maximization of spacecraft in orbit. The developed methodology enables satellite Multidisciplinary Design Optimization (MDO) that is extendable to on-orbit operation. Optimization of on-orbit operations is possible with MDO since the model predictive controller developed in this dissertation guarantees the achievement of the on-ground design behavior in orbit. To enable the design optimization of highly constrained and complex-shaped space systems, the spherical coordinate analysis technique, called the "Attitude Sphere", is extended and merged with an additional engineering tools like OpenGL. OpenGL's graphic acceleration facilitates the accurate estimation of the shadow-degraded photovoltaic cell area. This technique is applied to the design optimization of the satellite Electric Power System (EPS) and the design result shows that the amount of photovoltaic power generation can be increased more than 9%. Based on this initial methodology, the goal of this effort is extended from Single Discipline Optimization to Multidisciplinary Optimization, which includes the design and also operation of the EPS, Attitude Determination and Control System (ADCS), and communication system. The geometry optimization satisfies the conditions of the ground development phase; however, the operation optimization may not be as successful as expected in orbit due to disturbances. To address this issue, for the ADCS operations, controllers based on Model Predictive Control that are effective for constraint handling were developed and implemented. All the suggested design and operation methodologies are applied to a mission "CADRE", which is space weather mission scheduled for operation in 2016. This application demonstrates the usefulness and capability of the methodology to enhance CADRE's capabilities, and its ability to be applied to a variety of missions.

  14. Support of Helicopter 'Free Flight' Operations in the 1996 Olympics

    NASA Technical Reports Server (NTRS)

    Branstetter, James R.; Cooper, Eric G.

    1996-01-01

    The microcosm of activity surrounding the 1996 Olympic Games provided researchers an opportunity for demonstrating state-of-the art technology in the first large-scale deployment of a prototype digital communication/navigation/surveillance system in a confined environment. At the same time it provided an ideal opportunity for transportation officials to showcase the merits of an integrated transportation system in meeting the operational needs to transport time sensitive goods and provide public safety services under real-world conditions. Five aeronautical CNS functions using a digital datalink system were chosen for operational flight testing onboard 91 aircraft, most of them helicopters, participating in the Atlanta Short-Haul Transportation System. These included: GPS-based Automatic Dependent Surveillance, Cockpit Display of Traffic Information, Controller-Pilot Communications, Graphical Weather Information (uplink), and Automated Electronic Pilot Reporting (downlink). Atlanta provided the first opportunity to demonstrate, in an actual operating environment, key datalink functions which would enhance flight safety and situational awareness for the pilot and supplement conventional air traffic control. The knowledge gained from such a large-scale deployment will help system designers in development of a national infrastructure where aircraft would have the ability to navigate autonomously.

  15. CubeSat Mission- Near-Earth Asteroid Scout (animation only, no audio)

    NASA Image and Video Library

    2016-09-21

    The Near-Earth Asteroid Scout, or NEA Scout, is a robotic reconnaissance mission that will deploy a 6U CubeSat to fly by and return data from an asteroid representative of possible human destinations. Using a solar sail for its propulsion system, it will perform reconnaissance of an asteroid, take pictures and observe its position in space. Launching on NASA's Space Launch System rocket, the CubeSat deployment animation starts at the 1:25 timecode with the solar sail deployment animation beginning at the 2:54 timecode. The NEA Scout team is currently evaluating a range of targets, and is continually updating the candidate pool based on new discoveries and expected performance. NEA Scout is one of three payloads selected by NASA’s Human Exploration and Operations Mission Directorate. These small satellites were chosen to address Strategic Knowledge Gaps (SKGs) and help inform research strategies and prioritize technology development for future human and robotic exploration. It is being developed at NASA’s Marshall Space Flight Center in Huntsville, Alabama. Learn more by visiting http://www.nasa.gov/content/nea-scout

  16. Austere, remote, and disaster medicine missions: an operational mnemonic can help organize a deployment.

    PubMed

    Macias, Darryl J; Williams, Jason

    2013-01-01

    Medical care in resource-limited environments (austere settings) can occur in the context of a disaster, wilderness, or a tactical field operation. Regardless of the type of environment, there are common organizational themes in most successful humanitarian missions that occur in harsh natural or manmade environmental conditions. These principles prioritize the initiation and execution of any given deployment in austere or remote settings, diverging from priorities that would occur in a situation in which change to the existing medical structure is intact and operating well. Attention to these priorities not only helps providers to deliver medical care to people in need during a period of resource limitations but it also can keep providers, teams, the public, and patients safe during and after a deployment.

  17. Operational Research: Evaluating Multimodel Implementations for 24/7 Runtime Environments

    NASA Astrophysics Data System (ADS)

    Burkhart, J. F.; Helset, S.; Abdella, Y. S.; Lappegard, G.

    2016-12-01

    We present a new open source framework for operational hydrologic rainfall-runoff modeling. The Statkraft Hydrologic Forecasting Toolbox (Shyft) is unique from existing frameworks in that two primary goals are to provide: i) modern, professionally developed source code, and ii) a platform that is robust and ready for operational deployment. Developed jointly between Statkraft AS and The University of Oslo, the framework is currently in operation in both private and academic environments. The hydrology presently available in the distribution is simple and proven. Shyft provides a platform for distributed hydrologic modeling in a highly efficient manner. In it's current operational deployment at Statkraft, Shyft is used to provide daily 10-day forecasts for critical reservoirs. In a research setting, we have developed a novel implementation of the SNICAR model to assess the impact of aerosol deposition on snow packs. Several well known rainfall-runoff algorithms are available for use, allowing for intercomparing different approaches based on available data and the geographical environment. The well known HBV model is a default option, and other routines with more localized methods handling snow and evapotranspiration, or simplifications of catchment scale processes are included. For the latter, we have implemented the Kirchner response routine. Being developed in Norway, a variety snow-melt routines, including simplified degree day models or more advanced energy balance models, may be selected. Ensemble forecasts, multi-model implementations, and statistical post-processing routines enable a robust toolbox for investigating optimal model configurations in an operational setting. The Shyft core is written in modern templated C++ and has Python wrappers developed for easy access to module sub-routines. The code is developed such that the modules that make up a "method stack" are easy to modify and customize, allowing one to create new methods and test them rapidly. Due to the simple architecture and ease of access to the module routines, we see Shyft as an optimal choice to evaluate new hydrologic routines in an environment requiring robust, professionally developed software and welcome further community participation.

  18. Net-Centric Sensors and Data Sources (N-CSDS) GEODSS Sidecar

    NASA Astrophysics Data System (ADS)

    Richmond, D.

    2012-09-01

    Vast amounts of Space Situational Sensor data is collected each day on closed, legacy systems. Massachusetts Institute of Technology Lincoln Laboratory (MIT/LL) developed a Net-Centric approach to expose this data under the Extended Space Sensors Architecture (ESSA) Advanced Concept Technology Demonstration (ACTD). The Net-Centric Sensors and Data Sources (N-CSDS) Ground-based Electro Optical Deep Space Surveillance (GEODSS) Sidecar is the next generation that moves the ESSA ACTD engineering tools to an operational baseline. The N-CSDS GEODSS sidecar high level architecture will be presented, highlighting the features that supports deployment at multiple diverse sensor sites. Other key items that will be covered include: 1) The Web Browser interface to perform searches of historical data 2) The capabilities of the deployed Web Services and example service request/responses 3) Example data and potential user applications will be highlighted 4) Specifics regarding the process to gain access to the N-CSDS GEODSS sensor data in near real time 5) Current status and future deployment plans (Including plans for deployment to the Maui GEODSS Site)

  19. Overview of hybrid fiber-coaxial network deployment in the deregulated UK environment

    NASA Astrophysics Data System (ADS)

    Cox, Alan L.

    1995-11-01

    Cable operators in the U.K. enjoy unprecedented license to construct networks and operate cable TV and telecommunications services within their franchise areas. In general, operators have built hybrid-fiber-coax (HFC) networks for cable TV in parallel with fiber-copper-pair networks for telephony. The commonly used network architectures are reviewed, together with their present and future capacities. Despite this dual-technology approach, there is considerable interest in the integration of telephony services onto the HFC network and the development of new interactive services for which HFC may be more suitable than copper pairs. Certain technological and commercial developments may have considerable significance for HFC networks and their operators. These include the digitalization of TV distribution and the rising demand for high-rate digital access lines. Possible scenarios are discussed.

  20. Scientific Hybrid Realtiy Environments (SHyRE): Bringing Field Work into the Laboratory

    NASA Technical Reports Server (NTRS)

    Miller, M. J.; Graff, T.; Young, K.; Coan, D.; Whelley, P.; Richardson, J.; Knudson, C.; Bleacher, J.; Garry, W. B.; Delgado, F.; hide

    2018-01-01

    The use of analog environments in preparing for future planetary surface exploration is key in ensuring we both understand the processes shaping other planetary surfaces as well as develop the technology, systems, and concepts of operations necessary to operate in these geologic environments. While conducting fieldwork and testing technology in relevant terrestrial field environments is crucial in this development, it is often the case that operational testing requires a time-intensive iterative process that is hampered by the rigorous conditions (e.g. terrain, weather, location, etc.) found in most field environments. Additionally, field deployments can be costly and must be scheduled months in advance, therefore limiting the testing opportunities required to investigate and compare science operational concepts to only once or twice per year.

  1. A 16-m Telescope for the Advanced Technology Large Aperture Telescope (ATLAST) Mission

    NASA Astrophysics Data System (ADS)

    Lillie, Charles F.; Dailey, D. R.; Polidan, R. S.

    2010-01-01

    Future space observatories will require increasingly large telescopes to study the earliest stars and galaxies, as well as faint nearby objects. Technologies now under development will enable telescopes much larger than the 6.5-meter diameter James Webb Space Telescope (JWST) to be developed at comparable costs. Current segmented mirror and deployable optics technology enables the 6.5 meter JWST telescope to be folded for launch in the 5-meter diameter Ariane 5 payload fairing, and deployed autonomously after reaching orbit. Late in the next decade, when the Ares V Cargo Launch Vehicle payload fairing becomes operational, even larger telescope can be placed in orbit. In this paper we present our concept for a 16-meter JWST derivative, chord-fold telescope which could be stowed in the 10-m diameter Ares V fairing, plus a description of the new technologies that enable ATLAST to be developed at an affordable price.

  2. A technology program for the development of the large deployable reflector for space based astronomy

    NASA Technical Reports Server (NTRS)

    Kiya, M. K.; Gilbreath, W. P.; Swanson, P. N.

    1982-01-01

    Technologies for the development of the Large Deployable Reflector (LDR), a NASA project for the 1990's, for infrared and submillimeter astronomy are presented. The proposed LDR is a 10-30 diameter spaceborne observatory operating in the spectral region from 30 microns to one millimeter, where ground observations are nearly impossible. Scientific rationales for such a system include the study of ancient signals from galaxies at the edge of the universe, the study of star formation, and the observation of fluctuations in the cosmic background radiation. System requirements include the ability to observe faint objects at large distances and to map molecular clouds and H II regions. From these requirements, mass, photon noise, and tolerance budgets are developed. A strawman concept is established, and some alternate concepts are considered, but research is still necessary in the areas of segment, optical control, and instrument technologies.

  3. Transrapid (the first high-speed Maglev train system certified ready for application): Development status and prospects for deployment

    NASA Technical Reports Server (NTRS)

    Luerken, Reinhard F.

    1994-01-01

    The Transrapid maglev technology is at the threshold of commercial deployment and technologically all prerequisites for the successful operation of the system in public service are given. In post unification Germany the domestic maglev technology is envisioned to be applied in the Berlin-Hamburg project. At present, a public-private funding concept is being prepared and the lengthy planning process is about to be initiated. In the USA the AMG has presented a program to Americanize the technology and to make it available for commercial use in the U.S. in the very near future. The paramount features of this program are to generate economic development, provide a basis for transportation technology development, create opportunities for U.S. industry, improve the U.S. transportation infrastructure, and improve the environment and traveler safety. Maglev is ready for the U.S.; is the U.S. ready for maglev?

  4. Deployment of the third-generation infrared cloud imager: A two-year study of Arctic clouds at Barrow, Alaska

    NASA Astrophysics Data System (ADS)

    Nugent, Paul Winston

    Cloud cover is an important but poorly understood component of current climate models, and although climate change is most easily observed in the Arctic, cloud data in the Arctic is unreliable or simply unavailable. Ground-based infrared cloud imaging has the potential to fill this gap. This technique uses a thermal infrared camera to observe cloud amount, cloud optical depth, and cloud spatial distribution at a particular location. The Montana State University Optical Remote Sensor Laboratory has developed the ground-based Infrared Cloud Imager (ICI) instrument to measure spatial and temporal cloud data. To build an ICI for Arctic sites required the system to be engineered to overcome the challenges of this environment. Of particular challenge was keeping the system calibration and data processing accurate through the severe temperature changes. Another significant challenge was that weak emission from the cold, dry Arctic atmosphere pushed the camera used in the instrument to its operational limits. To gain an understanding of the operation of the ICI systems for the Arctic and to gather critical data on Arctic clouds, a prototype arctic ICI was deployed in Barrow, AK from July 2012 through July 2014. To understand the long-term operation of an ICI in the arctic, a study was conducted of the ICI system accuracy in relation to co-located active and passive sensors. Understanding the operation of this system in the Arctic environment required careful characterization of the full optical system, including the lens, filter, and detector. Alternative data processing techniques using decision trees and support vector machines were studied to improve data accuracy and reduce dependence on auxiliary instrument data and the resulting accuracy is reported here. The work described in this project was part of the effort to develop a fourth-generation ICI ready to be deployed in the Arctic. This system will serve a critical role in developing our understanding of cloud cover in the Arctic, an important but poorly understood region of the world.

  5. Developing Intercultural Adaptability in the Warfighter: A Workshop on Cultural Training and Education

    DTIC Science & Technology

    2010-11-01

    operational culture ” concept and teaching of interpersonal skills in advisor training, but emphasizes regional studies both in its pre-deployment...experts and non-experts. Building on earlier discussions, the group focused on the concept of cross- cultural competence and debated whether it is...For skills, the goal is to understand general regional concepts (not region-specific facts) and to develop confidence through cross- cultural

  6. Radiation Control Coatings Installed on Federal Buildings at Tyndall Air Force Base

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kaba, R.L.; Petrie, T.W.

    1999-03-16

    The technical objectives of this CRADA comprise technology deployment and energy conservation efforts with the radiation control coatings industry and the utility sector. The results of this collaboration include a high-level data reporting, analysis and management system to support the deployment efforts. The technical objectives include successfully install, commission, operate, maintain and document the performance of radiation control coatings on roofs at Tyndall AFB and the Buildings Technology Center at the Oak Ridge National Laboratory; determine the life cycle savings that can be achieved by using radiation control coatings on entire roofs at Tyndall AFB, based on documented installed costmore » and operating maintenance costs with and without the coatings; determine if any specific improvements are required in the coatings before they can be successfully deployed in the federal sector; determine the most effective way to facilitate the widespread and rapid deployment of radiation control coatings in the federal sector; and clearly define any barriers to deployment.« less

  7. Small Cube Satellite Deploy

    NASA Image and Video Library

    2013-11-19

    ISS038-E-003874 (19 Nov. 2013) --- Three nanosatellites, known as Cubesats, are deployed from a Small Satellite Orbital Deployer (SSOD) attached to the Kibo laboratory's robotic arm at 7:10 a.m. (EST) on Nov. 19, 2013. Japan Aerospace Exploration Agency astronaut Koichi Wakata, Expedition 38 flight engineer, monitored the satellite deployment while operating the Japanese robotic arm from inside Kibo. The Cubesats were delivered to the International Space Station Aug. 9, aboard Japan's fourth H-II Transfer Vehicle, Kounotori-4.

  8. British Geological Survey remotely operated sea bed rockdrills and vibrocorers: new advances to meet the needs of the scientific community.

    NASA Astrophysics Data System (ADS)

    Stewart, H. A.; Stevenson, A.; Wilson, M.; Pheasant, I.

    2014-12-01

    The British Geological Survey (BGS) have developed a number of coring and drilling systems for use in science projects in the UK and internationally. These include 3m and 6m vibrocoring systems; a 5m combined rockdrill and vibrocorer system; an oriented drill designed specifically to recover samples for use in palaeomagnetic studies; and a 55m rockdrill (RockDrill2). Recently, BGS have developed an autonomous, battery-operated vibrocoring system compatible with both the 3m and 6m vibrocorers, which can be used in water depths up to 6000m. Use of a battery system negates the use of an umbilical power cable to operate the vibrocorer, which instead can be deployed using the vessels A-frame and winch. The autonomous battery system comprises six 48V 19Ah batteries connected in series to give a 288V power source, a microprocessor and real-time clock. Data from the sensors are recorded with a time-stamp, giving diagnostic information that can be downloaded once the system is returned to the deck. The vibrocorer is operated via a pre-set program which is set up before deployment.The new system not only allows vibrocoring in greater water depths, but can also be used on smaller vessels where deck space is limited as a separate winch and umbilical is not required. The autonomous system was used for the first time in June 2014 on-board the RV Belgica to acquire samples from 20 sites in the Dangeard and Explorer canyon heads, off the southwest of England in 430m water depth.Another development is the BGS 55m rockdrill (RockDrill2), a remotely operated sampling system capable of coring up to 55m below sea floor in water depths up to 4000m. The rockdrill can be operated via its own launch and recovery system and can be outfitted with additional sensors such as gas flow meters, which have been designed by the BGS for assessing volume of gas hydrate, and down-hole logging tools. The 55m rockdrill has recently been used to sample hydrate-entrained sediments in the Sea of Japan. The maximum coring depth achieved was 32m below sea floor and the system can operate for more than 50 hours on a single deployment. The BGS system will be used in conjunction with the Bremen University (MARUM) MeBo sea-floor rockdrill on future International Ocean Discovery Program (IODP) expeditions.

  9. Postdeployment Respiratory Health Care Encounters Following Deployment to Kabul, Afghanistan: A Retrospective Cohort Study.

    PubMed

    Sharkey, Jessica M; Abraham, Joseph H; Clark, Leslie L; Rohrbeck, Patricia; Ludwig, Sharon L; Hu, Zheng; Baird, Coleen P

    2016-03-01

    Inhalational hazards are numerous in operational environments. A retrospective cohort study was conducted to investigate associations between deployment to Kabul, Afghanistan and subsequent respiratory health among U.S. military personnel. The study population consisted of personnel who deployed to Kabul, select Operation Enduring Freedom locations, personnel stationed in the Republic of Korea, and U.S.-stationed personnel. Incidence rate ratios (IRRs) were estimated for respiratory symptoms, signs, and ill-defined conditions, asthma, and chronic obstructive pulmonary disease. A significantly elevated rate of symptoms, signs, and ill-defined conditions was observed among Kabul-deployed personnel compared to personnel deployed or stationed in Bagram (IRR 1.12; 95% confidence interval [CI], 1.05-1.19), Republic of Korea (IRR 1.20; 95% CI, 1.10-1.31), and the United States (IRR 1.52; 95% CI, 1.43-1.62). A statistically elevated rate of asthma was observed among personnel deployed to Kabul, relative to U.S.-stationed personnel (IRR 1.61; 95% CI, 1.22-2.12). Statistically significant rates were not observed for chronic obstructive pulmonary disease among Kabul-deployed personnel compared to other study groups. These findings suggest that deployment to Kabul is associated with an elevated risk of postdeployment respiratory symptoms and new-onset asthma. Reprint & Copyright © 2016 Association of Military Surgeons of the U.S.

  10. Uniformed Diplomacy: Reviewing the Army Leader Development Strategy in Light of the Regional Alignment of Forces Construct

    DTIC Science & Technology

    2014-06-13

    Component Command. Developing this operational flexibility, Army Chief of Staff General Raymond Odierno believes, will help improve the effectiveness of...days of arriving in Africa, he and 45 other soldiers found themselves “working with local forces and U.S. Embassy staff to stiffen protection at the...missions, neither USARAF nor DOS have fully developed measure of effectiveness criteria for these deployments.35 Thus far each mission’s after action

  11. GridAPPS-D

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    2017-03-28

    GridAPPS-D is an open-source, open architecture, standards based platform for development of advanced electric power system planning and operations applications. GridAPPS-D provides a documented data abstraction for the application developer enabling creation of applications that can be run in any compliant system or platform. This enables development of applications that are platform vendor independent applications and applications that take advantage of the possibility of data rich and data driven applications based on deployment of smart grid devices and systems.

  12. DoD Life Cycle Management (LCM) and Product Support Manager (PSM) Rapid Deployment Training

    DTIC Science & Technology

    2010-10-01

    fielding, sustainment, and disposal of a DOD system across its life cycle.” (JCIDS Operation Manual) • “The PM shall be the single point of...devote more funds to development and procurement in order to modernize weapon systems . But, in fact, growth in operating and support costs has limited the...Requirements Differently could Reduce Weapon Systems ’ Total Ownership Costs The DoD “Death Spiral” (Source: Dr. Jacques S. Gansler, USD(A&T

  13. Novel Sample-handling Approach for XRD Analysis with Minimal Sample Preparation

    NASA Technical Reports Server (NTRS)

    Sarrazin, P.; Chipera, S.; Bish, D.; Blake, D.; Feldman, S.; Vaniman, D.; Bryson, C.

    2004-01-01

    Sample preparation and sample handling are among the most critical operations associated with X-ray diffraction (XRD) analysis. These operations require attention in a laboratory environment, but they become a major constraint in the deployment of XRD instruments for robotic planetary exploration. We are developing a novel sample handling system that dramatically relaxes the constraints on sample preparation by allowing characterization of coarse-grained material that would normally be impossible to analyze with conventional powder-XRD techniques.

  14. Train as You Will Fight: Factors Affecting Development of a Strategy to Train National Guard Units to the Level Organized

    DTIC Science & Technology

    1990-01-01

    and Colorado National Guard proved itself through a series of successful operations in the North African campaign, General George S. Patton...prior to deployment into the North African Theater and to its employment as a homogenous unit. A look at how other National Guard units have been used in...the Army. RESERVE COMPONENT IMPACT ON THE TOTAL FORCE FM 100-5, Operations, the Army’s keystone warfighting manual charges that *rigorous, realistic

  15. Deployment-related mental health support: comparative analysis of NATO and allied ISAF partners

    PubMed Central

    Vermetten, Eric; Greenberg, Neil; Boeschoten, Manon A.; Delahaije, Roos; Jetly, Rakesh; Castro, Carl A.; McFarlane, Alexander C.

    2014-01-01

    Background For years there has been a tremendous gap in our understanding of the mental health effects of deployment and the efforts by military forces at trying to minimize or mitigate these. Many military forces have recently systematized the mental support that is provided to support operational deployments. However, the rationale for doing so and the consequential allocation of resources are felt to vary considerably across North Atlantic Treaty Organisation (NATO) International Security Assistance (ISAF) partners. This review aims to compare the organization and practice of mental support by five partnering countries in the recent deployment in Afghanistan in order to identify and compare the key methods and structures for delivering mental health support, describe bottlenecks and illustrate new developments. Method Information was collected through document analysis and semi-structured interviews with key military mental healthcare stakeholders. The review resulted from close collaboration between key military mental healthcare professionals within the Australian Defense Forces (ADF), Canadian Armed Forces (CAF), United Kingdom Armed Forces (UK), Netherlands Armed Forces (NLD), and the United States Army (US). Key stakeholders were interviewed about the mental health support provided during a serviceperson's military career. The main items discussed were training, prevention, early identification, intervention, and aftercare in the field of mental health. Results All forces reported that much attention was paid to mental health during the individual's military career, including deployment. In doing so there was much overlap between the rationale and applied methods. The main method of providing support was through training and education. The educative focus was to strengthen the mental resilience of individual soldiers while providing a range of mental healthcare services. All forces had abandoned standard psychological debriefing after critical incidents. Instead, by default, mental healthcare professionals acted to support the leader and peer led “after action” reviews. All countries provided professional mental support close to the front line, aimed at early detection and early return to normal activities within the unit. All countries deployed a mental health support team that consisted of a range of mental health staff including psychiatrists, psychologists, social workers, mental health nurses, and chaplains. There was no overall consensus in the allocation of mental health disciplines in theatre. All countries (except the US) provided troops with a third location decompression (TLD) stop after deployment, which aimed to recognize what the deployed units had been through and to prepare them for transition home. The US conducted in-garrison ‘decompression’, or ‘reintegration training’ in the US, with a similiar focus to TLD. All had a reasonably comparable infrastructure in the field of mental healthcare. Shared bottlenecks across countries included perceived stigma and barriers to care around mental health problems as well as the need for improving the awareness and recognition of mental health problems among service members. Conclusion This analysis demonstrated that in all five partners state-of-the-art preventative mental healthcare was included in the last deployment in Afghanistan, including a positive approach towards strengthening the mental resilience, a focus on self-regulatory skills and self-empowerment, and several initiatives that were well-integrated in a military context. These initiatives were partly/completely implemented by the military/colleagues/supervisors and applicable during several phases of the deployment cycle. Important new developments in operational mental health support are recognition of the role of social leadership and enhancement of operational peer support. This requires awareness of mental problems that will contribute to reduction of the barriers to care in case of problems. Finally, comparing mental health support services across countries can contribute to optimal preparation for the challenges of military deployment. PMID:25206953

  16. Alternative Fuels Data Center

    Science.gov Websites

    Governor's Steering Committee on Autonomous and Connected Vehicle Testing and Deployment (Committee) to support the testing and deployment of AVs, identify corridors for AV testing and operation, and make

  17. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Crolley, R.; Thompson, M.

    There has been a need for a faster and cheaper deployment model for information technology (IT) solutions to address waste management needs at US Department of Energy (DOE) complex sites for years. Budget constraints, challenges in deploying new technologies, frequent travel, and increased job demands for existing employees have prevented IT organizations from staying abreast of new technologies or deploying them quickly. Despite such challenges, IT organizations have added significant value to waste management handling through better worker safety, tracking, characterization, and disposition at DOE complex sites. Systems developed for site-specific missions have broad applicability to waste management challenges andmore » in many cases have been expanded to meet other waste missions. Radio frequency identification (RFID) and global positioning satellite (GPS)-enabled solutions have reduced the risk of radiation exposure and safety risks. New web-based and mobile applications have enabled precision characterization and control of nuclear materials. These solutions have also improved operational efficiencies and shortened schedules, reduced cost, and improved regulatory compliance. Collaboration between US Department of Energy (DOE) complex sites is improving time to delivery and cost efficiencies for waste management missions with new information technologies (IT) such as wireless computing, global positioning satellite (GPS), and radio frequency identification (RFID). Integrated solutions developed at separate DOE complex sites by new technology Centers of Excellence (CoE) have increased material control and accountability, worker safety, and environmental sustainability. CoEs offer other DOE sister sites significant cost and time savings by leveraging their technology expertise in project scoping, implementation, and ongoing operations.« less

  18. Gender differences among veterans deployed in support of the wars in Afghanistan and Iraq.

    PubMed

    Street, Amy E; Gradus, Jaimie L; Giasson, Hannah L; Vogt, Dawne; Resick, Patricia A

    2013-07-01

    The changing scope of women's roles in combat operations has led to growing interest in women's deployment experiences and post-deployment adjustment. To quantify the gender-specific frequency of deployment stressors, including sexual and non-sexual harassment, lack of social support and combat exposure. To quantify gender-specific post-deployment mental health conditions and associations between deployment stressors and posttraumatic stress disorder (PTSD), to inform the care of Veterans returning from the current conflicts. National mail survey of OEF/OIF Veterans randomly sampled within gender, with women oversampled. The community. In total, 1,207 female and 1,137 male Veterans from a roster of all Operation Enduring Freedom/Operation Iraqi Freedom (OEF/OIF) Veterans. Response rate was 48.6 %. Deployment stressors (including combat and harassment stress), PTSD, depression, anxiety and alcohol use, all measured via self-report. Women were more likely to report sexual harassment (OR = 8.7, 95% CI: 6.9, 11) but less likely to report combat (OR = 0.62, 95 % CI: 0.50, 0.76). Women and men were equally likely to report symptoms consistent with probable PTSD (OR = 0.87, 95 % CI: 0.70, 1.1) and symptomatic anxiety (OR = 1.1, 9 5% CI: 0.86, 1.3). Women were more likely to report probable depression (OR = 1.3, 95 % CI: 1.1, 1.6) and less likely to report problematic alcohol use (OR = 0.59, 9 5% CI: 0.47, 0.72). With a five-point change in harassment stress, adjusted odds ratios for PTSD were 1.36 (95 % CI: 1.23, 1.52) for women and 1.38 (95 % CI: 1.19, 1.61) for men. The analogous associations between combat stress and PTSD were 1.31 (95 % CI: 1.24, 1.39) and 1.31 (95 % CI: 1.26, 1.36), respectively. Although there are important gender differences in deployment stressors-including women's increased risk of interpersonal stressors-and post-deployment adjustment, there are also significant similarities. The post-deployment adjustment of our nation's growing population of female Veterans seems comparable to that of our nation's male Veterans.

  19. The Design of a Portable and Deployable Solar Energy System for Deployed Military Applications

    DTIC Science & Technology

    2011-04-01

    Abstract- Global Positioning Systems, thermal imaging scopes, satellite phones, and other electronic devices are critical to the warfighter in... imaging scopes, satellite phones, and other electronic devices are critical to the warfighter in Forward Operating Environments. Many are battery operated...Technology & Engineering 24. Kumar, Shrawan, Mital, Anil, Electromyography in ergonomics 25. Stanton, Neville Human factors in consumer products, CRC

  20. COmmunications and Networking with QUantum operationally Secure Technology for Maritime Deployment (CONQUEST)

    DTIC Science & Technology

    2016-12-02

    Quantum Computing , University of Waterloo, Waterloo ON, N2L 3G1, Canada (Dated: December 1, 2016) Continuous variable (CV) quantum key distribution (QKD...Networking with QUantum operationally-Secure Technology for Maritime Deployment (CONQUEST) Contract Period of Performance: 2 September 2016 – 1 September...this letter or have any other questions. Sincerely, Raytheon BBN Technologies Kathryn Carson Program Manager Quantum Information Processing

  1. COmmunications and Networking with QUantum Operationally-Secure Technology for Maritime Deployment (CONQUEST)

    DTIC Science & Technology

    2017-03-06

    Raytheon BBN Technologies ; Dr. Saikat Guha Contractor Address: 10 Moulton Street, Cambridge, MA 02138 Title of the Project : COmmunications and...BBN Technologies 10 Moulton Street Cambridge, MA 02138 6 March 2017 US Navy Office of Naval Research One Liberty Center 875 North Randolph...Networking with QUantum operationally-Secure Technology for Maritime Deployment (CONQUEST) Contract Period of Performance: 2 September 2016 – 1

  2. Deployment of the National Transparent Optical Network around the San Francisco Bay Area

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    McCammon, K.; Haigh, R.; Armstrong, G.

    1996-06-01

    We report on the deployment and initial operation of the National Transparent Optical Network, an experimental WDM network testbed around the San Francisco Bay Area, during the Optical Fiber Conference (OFC`96) held in San Jose, CA. The deployment aspects of the physical plant, optical and SONET layers are examined along with a discussion of broadband applications which utilized the network during the OFC`96 demonstration. The network features dense WDM technology, transparent optical routing technology using acousto- optic tunable filter based switches, and network modules with add/drop, multicast, and wavelength translation capabilities. The physical layer consisted of over 300 km ofmore » Sprint and Pacific Bell conventional single mode fiber which was amplified with I I optical amplifiers deployed in pre-amp, post-amp, and line amp configurations. An out-of-band control network provided datacom channels from remote equipment sites to the SONET network manager deployed at the San Jose Convention Center for the conference. Data transport over five wavelengths was achieved in the 1550 nm window using a variety of signal formats including analog and digital signal transmission on different wavelengths on the same fiber. The network operated throughout the week of OFC`96 and is still in operation today.« less

  3. Design and operational experience of a microwave cavity axion detector for the 20 – 100 μ eV range

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Al Kenany, S.; Anil, M. A.; Backes, K. M.

    We describe a dark matter axion detector designed, constructed, and operated both as an innovation platform for new cavity and amplifier technologies and as a data pathfinder in the 5-25 GHz range (~20-100 eV). The platform is small but flexible to facilitate the development of new microwave cavity and amplifier concepts in an operational environment. The experiment has recently completed its first data production; it is the first microwave cavity axion search to deploy a Josephson parametric amplifier and a dilution refrigerator to achieve near-quantum limited performance.

  4. Design and operational experience of a microwave cavity axion detector for the 20 – 100 μ eV range

    DOE PAGES

    Al Kenany, S.; Anil, M. A.; Backes, K. M.; ...

    2017-02-09

    We describe a dark matter axion detector designed, constructed, and operated both as an innovation platform for new cavity and amplifier technologies and as a data pathfinder in the 5-25 GHz range (~20-100 eV). The platform is small but flexible to facilitate the development of new microwave cavity and amplifier concepts in an operational environment. The experiment has recently completed its first data production; it is the first microwave cavity axion search to deploy a Josephson parametric amplifier and a dilution refrigerator to achieve near-quantum limited performance.

  5. Innovations for ISS Plug-In Plan (IPiP) Operations

    NASA Technical Reports Server (NTRS)

    Moore, Kevin D.

    2013-01-01

    Limited resources and increasing requirements will continue to influence decisions on ISS. The ISS Plug-In Plan (IPiP) supports power and data for utilization, systems, and daily operations through the Electrical Power System (EPS) Secondary Power/Data Subsystem. Given the fluid launch schedule, the focus of the Plug-In Plan has evolved to anticipate future requirements by judicious development and delivery of power supplies, power strips, Alternating Current (AC) power inverters, along with innovative deployment strategies. A partnership of ISS Program Office, Engineering Directorate, Mission Operations, and International Partners poses unique solutions with existing on-board equipment and resources.

  6. An Operations Concept for Integrated Model-Centric Engineering at JPL

    NASA Technical Reports Server (NTRS)

    Bayer, Todd J.; Cooney, Lauren A.; Delp, Christopher L.; Dutenhoffer, Chelsea A.; Gostelow, Roli D.; Ingham, Michel D.; Jenkins, J. Steven; Smith, Brian S.

    2010-01-01

    As JPL's missions grow more complex, the need for improved systems engineering processes is becoming clear. Of significant promise in this regard is the move toward a more integrated and model-centric approach to mission conception, design, implementation and operations. The Integrated Model-Centric Engineering (IMCE) Initiative, now underway at JPL, seeks to lay the groundwork for these improvements. This paper will report progress on three fronts: articulating JPL's need for IMCE; characterizing the enterprise into which IMCE capabilities will be deployed; and constructing an operations concept for a flight project development in an integrated model-centric environment.

  7. EarthScope's Transportable Array: Status of the Alaska Deployment and Guide to Resources for Lower48 Deployment

    NASA Astrophysics Data System (ADS)

    Busby, R. W.; Woodward, R.; Aderhold, K.; Frassetto, A.

    2017-12-01

    The Alaska Transportable Array deployment is completely installed, totaling 280 stations, with 194 new stations and 86 existing stations, 28 of those upgraded with new sensor emplacement. We briefly summarize the deployment of this seismic network, describe the added meteorological instruments and soil temperature gauges, and review our expectations for operation and demobilization. Curation of data from the contiguous Lower-48 States deployment of Transportable Array (>1800 stations, 2004-2015) has continued with the few gaps in real-time data replaced by locally archived files as well as minor adjustments in metadata. We highlight station digests that provide more detail on the components and settings of individual stations, documentation of standard procedures used throughout the deployment and other resources available online. In cooperation with IRIS DMC, a copy of the complete TA archive for the Lower-48 period has been transferred to a local disk to experiment with data access and software workflows that utilize most or all of the seismic timeseries, in contrast to event segments. Assembling such large datasets reliably - from field stations to a well managed data archive to a user's workspace - is complex. Sharing a curated and defined data volume with researchers is a potentially straightforward way to make data intensive analyses less difficult. We note that data collection within the Lower-48 continues with 160 stations of the N4 network operating at increased sample rates (100 sps) as part of the CEUSN, as operational support transitions from NSF to USGS.

  8. Space Shuttle to deploy Magellan planetary science mission

    NASA Technical Reports Server (NTRS)

    1989-01-01

    The objectives of Space Shuttle Mission STS-30 are described along with major flight activities, prelaunch and launch operations, trajectory sequence of events, and landing and post-landing operations. The primary objective of STS-30 is to successfully deploy the Magellan spacecraft into low earth orbit. Following deployment, Magellan will be propelled to its Venus trajectory by an Inertial Upper Stage booster. The objectives of the Magellan mission are to obtain radar images of more than 70 percent of Venus' surface, a near-global topographic map, and near-global gravity field data. Secondary STS-30 payloads include the Fluids Experiment Apparatus (FEA) and the Mesoscale Lightning Experiment (MLE).

  9. The Nomad Explorer assembly assist vehicle: An architecture for rapid global extraterrestrial base infrastructure establishment

    NASA Technical Reports Server (NTRS)

    Thangavelu, Madhu

    1994-01-01

    Traditional concepts of lunar bases describe scenarios where components of the bases are landed on the lunar surface, one at a time, and then put together to form a complete stationary lunar habitat. Recently, some concepts have described the advantages of operating a mobile or 'roving' lunar base. Such a base vastly improves the exploration range from a primary lunar base. Roving bases would also allow the crew to first deploy, test, operationally certify, and then regularly maintain, service, and evolve long life-cycle facilities like observatories or other science payload platforms that are operated far apart from each other across the extraterrestrial surface. The Nomad Explorer is such a mobile lunar base. This paper describes the architectural program of the Nomad Explorer, its advantages over a stationary lunar base, and some of the embedded system concepts which help the roving base to speedily establish a global extraterrestrial infrastructure. A number of modular autonomous logistics landers will carry deployable or erectable payloads, service, and logistically resupply the Nomad Explorer at regular intercepts along the traverse. Starting with the deployment of science experiments and telecommunication networks, and the manned emplacement of a variety of remote outposts using a unique EVA Bell system that enhances manned EVA, the Nomad Explorer architecture suggests the capability for a rapid global development of the extraterrestrial body. The Moon and Mars are candidates for this 'mission oriented' strategy. The lunar case is emphasized in this paper.

  10. USDOT guidance summary for connected vehicle deployments : deployment outreach.

    DOT National Transportation Integrated Search

    2016-07-01

    This document provides guidance material in regards to the outreach activities in the CV Pilot Deployment ConceptDevelopment Phase and deployment outreach plan in the Deployment Phases. This guidance provides keyrequirements and references in develop...

  11. DARPA DTN Phase 3 Core Engineering Support

    NASA Technical Reports Server (NTRS)

    Torgerson, J. Leigh; Richard Borgen, Richard; McKelvey, James; Segui, John; Tsao, Phil

    2010-01-01

    This report covers the initial DARPA DTN Phase 3 activities as JPL provided Core Engineering Support to the DARPA DTN Program, and then further details the culmination of the Phase 3 Program with a systematic development, integration and test of a disruption-tolerant C2 Situation Awareness (SA) system that may be transitioned to the USMC and deployed in the near future. The system developed and tested was a SPAWAR/JPL-Developed Common Operating Picture Fusion Tool called the Software Interoperability Environment (SIE), running over Disruption Tolerant Networking (DTN) protocols provided by BBN and MITRE, which effectively extends the operational range of SIE from normal fully-connected internet environments to the mobile tactical edges of the battlefield network.

  12. Small Cube Satellite Deploy

    NASA Image and Video Library

    2013-11-19

    ISS038-E-003870 (19 Nov. 2013) --- Three nanosatellites, known as Cubesats, are deployed from a Small Satellite Orbital Deployer (SSOD) attached to the Kibo laboratory’s robotic arm at 7:10 a.m. (EST) on Nov. 19, 2013. Japan Aerospace Exploration Agency astronaut Koichi Wakata, Expedition 38 flight engineer, monitored the satellite deployment while operating the Japanese robotic arm from inside Kibo. The Cubesats were delivered to the International Space Station Aug. 9, aboard Japan’s fourth H-II Transfer Vehicle, Kounotori-4.

  13. Small Cube Satellite Deploy

    NASA Image and Video Library

    2013-11-19

    ISS038-E-003869 (19 Nov. 2013) --- Three nanosatellites, known as Cubesats, are deployed from a Small Satellite Orbital Deployer (SSOD) attached to the Kibo laboratory’s robotic arm at 7:10 a.m. (EST) on Nov. 19, 2013. Japan Aerospace Exploration Agency astronaut Koichi Wakata, Expedition 38 flight engineer, monitored the satellite deployment while operating the Japanese robotic arm from inside Kibo. The Cubesats were delivered to the International Space Station Aug. 9, aboard Japan’s fourth H-II Transfer Vehicle, Kounotori-4.

  14. Small Cube Satellite Deploy

    NASA Image and Video Library

    2013-11-19

    ISS038-E-003871 (19 Nov. 2013) --- Three nanosatellites, known as Cubesats, are deployed from a Small Satellite Orbital Deployer (SSOD) attached to the Kibo laboratory’s robotic arm at 7:10 a.m. (EST) on Nov. 19, 2013. Japan Aerospace Exploration Agency astronaut Koichi Wakata, Expedition 38 flight engineer, monitored the satellite deployment while operating the Japanese robotic arm from inside Kibo. The Cubesats were delivered to the International Space Station Aug. 9, aboard Japan’s fourth H-II Transfer Vehicle, Kounotori-4.

  15. Small Cube Satellite Deploy

    NASA Image and Video Library

    2013-11-19

    ISS038-E-003872 (19 Nov. 2013) --- Three nanosatellites, known as Cubesats, are deployed from a Small Satellite Orbital Deployer (SSOD) attached to the Kibo laboratory’s robotic arm at 7:10 a.m. (EST) on Nov. 19, 2013. Japan Aerospace Exploration Agency astronaut Koichi Wakata, Expedition 38 flight engineer, monitored the satellite deployment while operating the Japanese robotic arm from inside Kibo. The Cubesats were delivered to the International Space Station Aug. 9, aboard Japan’s fourth H-II Transfer Vehicle, Kounotori-4.

  16. Deployable M-braced truss structure

    NASA Technical Reports Server (NTRS)

    Mikulas, M. M., Jr. (Inventor); Rhodes, M. D. (Inventor)

    1986-01-01

    A deployable M-braced truss structure, efficiently packaged into a compact stowed position and expandable to an operative position at the use site is described. The M-braced configuration effectively separates tension compression and shear in the structure and permits efficient structural design. Both diagonals and longerons telescope from an M-braced base unit and deploy either pneumatically, mechanically by springs or cables, or by powered reciprocating mechanisms. Upon full deployment, the diagonals and longerons lock into place with a simple latch mechanism.

  17. A Framework for Optimizing the Placement of Tidal Turbines

    NASA Astrophysics Data System (ADS)

    Nelson, K. S.; Roberts, J.; Jones, C.; James, S. C.

    2013-12-01

    Power generation with marine hydrokinetic (MHK) current energy converters (CECs), often in the form of underwater turbines, is receiving growing global interest. Because of reasonable investment, maintenance, reliability, and environmental friendliness, this technology can contribute to national (and global) energy markets and is worthy of research investment. Furthermore, in remote areas, small-scale MHK energy from river, tidal, or ocean currents can provide a local power supply. However, little is known about the potential environmental effects of CEC operation in coastal embayments, estuaries, or rivers, or of the cumulative impacts of these devices on aquatic ecosystems over years or decades of operation. There is an urgent need for practical, accessible tools and peer-reviewed publications to help industry and regulators evaluate environmental impacts and mitigation measures, while establishing best sitting and design practices. Sandia National Laboratories (SNL) and Sea Engineering, Inc. (SEI) have investigated the potential environmental impacts and performance of individual tidal energy converters (TECs) in Cobscook Bay, ME; TECs are a subset of CECs that are specifically deployed in tidal channels. Cobscook Bay is the first deployment location of Ocean Renewable Power Company's (ORPC) TidGenTM unit. One unit is currently in place with four more to follow. Together, SNL and SEI built a coarse-grid, regional-scale model that included Cobscook Bay and all other landward embayments using the modeling platform SNL-EFDC. Within SNL-EFDC tidal turbines are represented using a unique set of momentum extraction, turbulence generation, and turbulence dissipation equations at TEC locations. The global model was then coupled to a local-scale model that was centered on the proposed TEC deployment locations. An optimization frame work was developed that used the refined model to determine optimal device placement locations that maximized array performance. Within the framework, environmental effects are considered to minimize the possibility of altering flows to an extent that would affect fish-swimming behavior and sediment-transport trends. Simulation results were compared between model runs with the optimized array configuration, and the originally purposed deployment locations; the optimized array showed a 17% increase in power generation. The developed framework can provide regulators and developers with a tool for assessing environmental impacts and device-performance parameters for the deployment of MHK devices. The more thoroughly understood this promising technology, the more likely it will become a viable source of alternative energy.

  18. War-related stressors as predictors of post-deployment health of Air Force women.

    PubMed

    Pierce, Penny F; Lewandowski-Romps, Lisa; Silverschanz, Perry

    2011-01-01

    Little is known about the effects of combat exposure on women's health after service in Operation Iraqi Freedom (OIF). Our purpose was to describe the incidence and nature of physical heath symptoms reported by deployed women to identify problematic areas where early intervention or better surveillance might be directed. Using a random, stratified sample (theater vs. non-theater; parent vs. non-parent; and military component including active, guard, and reserve members) of 1,114 Air Force women, we provide descriptive statistics, group comparisons, and multiple regression models to identify health concerns and potential predictors of physical health outcomes. Findings revealed that those in the reserve/guard forces (vs. active duty) and those in the theater of operations (vs. elsewhere during the same time period) reported greater physical health problems (β = -0.07, p < .05 and β = 0.11, p < .001, respectively). Enlisted women reported poorer general health than officers (β = 0.09, p < .01). Women were more likely to report that their physical health was impacted by OIF if deployed to the theater versus deployment elsewhere (β = 0.16, p < .001) or if they were in the reserve forces (β = -0.11, p < .001). Further, women who were parents or deployed to the theater reported greater interference of physical and emotional problems on their social functioning (β = 0.08, p < .05 and β = 0.08, p < .01, respectively). Deployment to the theater of operations is significantly associated with physical health outcomes although the severity of the self-reported symptoms is low. Our findings suggest that further investigation is needed to explore the war-related predictors of health among women serving in deployed locations around the world. Copyright © 2011. Published by Elsevier Inc.

  19. Satellite services system analysis study. Volume 1: Executive summary

    NASA Technical Reports Server (NTRS)

    1981-01-01

    Service requirements are considered. Topics include development of on-orbit operations scenarios, service equipment summary, crew interaction, and satellite features facilitating servicing. Service equipment concepts are considered. Topics include payload deployment, close proximity retrieval, on-orbit servicing, backup/contingency, delivery/retrieval of high energy payloads, Earth return, optional service, and advanced capabilities. Program requirements are assessed.

  20. The application of artificial intelligent techniques to accelerator operations at McMaster University

    NASA Astrophysics Data System (ADS)

    Poehlman, W. F. S.; Garland, Wm. J.; Stark, J. W.

    1993-06-01

    In an era of downsizing and a limited pool of skilled accelerator personnel from which to draw replacements for an aging workforce, the impetus to integrate intelligent computer automation into the accelerator operator's repertoire is strong. However, successful deployment of an "Operator's Companion" is not trivial. Both graphical and human factors need to be recognized as critical areas that require extra care when formulating the Companion. They include interactive graphical user's interface that mimics, for the operator, familiar accelerator controls; knowledge of acquisition phases during development must acknowledge the expert's mental model of machine operation; and automated operations must be seen as improvements to the operator's environment rather than threats of ultimate replacement. Experiences with the PACES Accelerator Operator Companion developed at two sites over the past three years are related and graphical examples are given. The scale of the work involves multi-computer control of various start-up/shutdown and tuning procedures for Model FN and KN Van de Graaff accelerators. The response from licensing agencies has been encouraging.

  1. Understanding how deployment experiences change over time: Comparison of female and male OEF/OIF and Gulf War veterans.

    PubMed

    Fox, Annie B; Walker, Brian E; Smith, Brian N; King, Daniel W; King, Lynda A; Vogt, Dawne

    2016-03-01

    Despite increased attention to the evolving nature of war, the unique challenges of contemporary deployment, and women's changing role in warfare, few studies have examined differences in deployment stressors across eras of service or evaluated how gender differences in deployment experiences have changed over time. Using data collected from two national survey studies, we examined war cohort and gender differences in veterans' reports of both mission-related and interpersonal stressors during deployment. Although Operation Enduring Freedom and Operation Iraqi Freedom veterans reported more combat experiences and greater preparedness for deployment compared to Gulf War veterans, Gulf War veterans reported higher levels of other mission-related stressors, including difficult living and working environment, perceived threat, and potential exposure to nuclear, biological, and chemical weapons. Gender differences also emerged, with men reporting greater exposure to mission-related stressors and women reporting higher levels of interpersonal stressors. However, the size and nature of gender differences did not differ significantly when comparing veterans of the two eras. By understanding how risk factors for PTSD differ based on war era and gender, veterans' experiences can be better contextualized. (c) 2016 APA, all rights reserved).

  2. Family stressors and postdeployment mental health in single versus partnered parents deployed in support of the wars in Afghanistan and Iraq.

    PubMed

    Vaughn-Coaxum, Rachel; Smith, Brian N; Iverson, Katherine M; Vogt, Dawne

    2015-08-01

    Little is known about the family-related stress and postdeployment adjustment of single versus partnered parents deployed in support of the wars in Iraq and Afghanistan. This study examined exposure to family-related stressors during and after deployment, as well as postdeployment psychological symptoms in a national sample of 318 single (n = 74) and partnered (n = 244) parent veterans of Operation Enduring Freedom and Operation Iraqi Freedom. Results demonstrated that single parents experienced higher levels of concern about life and family disruptions during deployment, lower levels of social support during and after deployment, and poorer postdeployment family functioning than partnered parents. Single parents also reported higher posttraumatic stress symptom severity, but not depression or anxiety symptom severity, compared with partnered parents. Family-related stressors demonstrated different associations with mental health for single and partnered parents, suggesting that some stressor-symptom relations may be more salient for single parents, and others may be more salient for partnered parents. Findings suggest that the deployment and postdeployment experiences of parents differ based on their partnered status, which has implications for the design and provision of services to single and partnered parents. (c) 2015 APA, all rights reserved).

  3. Women in war: operational issues of menstruation and unintended pregnancy.

    PubMed

    Christopher, Leslie A; Miller, Leslie

    2007-01-01

    With rapid and frequent deployments around the world, the current high level of military operations demands combat readiness of every military member. In the U.S. Armed Forces, women represent 15% of active duty troops and 17% of reserve and Guard troops and are a critical component for mission accomplishment. The operational issues of menstruation and unintended pregnancy, unique to this population, can decrease a female member's military readiness and affect her ability to deploy. Strategies to mitigate and even eliminate these concerns include the optional use of hormonal medications to induce reversible menstrual cycle suppression. These medications, traditionally indicated for contraception, should be considered essential for female troops during training and deployment. This article, tailored specifically for military women, provides valuable information regarding the risks and benefits, as well as the various options available for menstrual cycle suppression.

  4. Yogi the rock

    NASA Technical Reports Server (NTRS)

    1997-01-01

    Yogi, a rock taller than rover Sojourner, is the subject of this image, taken by the deployed Imager for Mars Pathfinder (IMP) on Sol 3. The soil in the foreground will be the location of multiple soil mechanics experiments performed by Sojourner's cleated wheels. Pathfinder scientists will be able to control the force inflicted on the soil beneath the rover's wheels, giving them insight into the soil's mechanical properties.

    The image was taken by the Imager for Mars Pathfinder (IMP) after its deployment on Sol 3. Mars Pathfinder was developed and managed by the Jet Propulsion Laboratory (JPL) for the National Aeronautics and Space Administration. JPL is an operating division of the California Institute of Technology (Caltech). The IMP was developed by the University of Arizona Lunar and Planetary Laboratory under contract to JPL. Peter Smith is the Principal Investigator.

  5. First Results from UAS Deployed Ocean Sensor Systems during the 2013 MIZOPEX Campaign

    NASA Astrophysics Data System (ADS)

    Palo, S. E.; Weibel, D.; Lawrence, D.; LoDolce, G.; Bradley, A. C.; Adler, J.; Maslanik, J. A.; Walker, G.

    2013-12-01

    The Marginal Ice Zone Observations and Processes Experiment (MIZOPEX), is an Arctic field campaign which occurred during summer 2013. The goals of the project are to understand how warming of the marginal ice zone affects sea ice melt and if this warming has been over or underestimated by satellite measurements. To achieve these goals calibrated physical measurements, both remote and in-situ, of the marginal ice zone over scales of square kilometers with a resolution of square meters is required. This will be accomplished with a suite of unmanned aerial vehicles (UAVs) equipped with both remote sensing and in-situ instruments, air deployed microbuoys, and ship deployed buoys. In this talk we will present details about the air deployed microbouys (ADMB) and self-deployed surface sondes (SDSS) developed at the University of Colorado. Both the ADMB and SDSS share a common measurement suite with the capability to measure water temperature at three distinct depths and provide position information via GPS. The ADMB is 90 grams, 1.3 inches in diameter, 4.25 inches long and is designed for deployment from the InSitu ScanEagle platform. The designed and experimentally verified operational lifetime is 10 days, however this can be extended with additional batteries.. While the ADMB are deployed from the ScanEagle, the SDSS are vectorable and can be remotely and precisely positioned. Lab performance results, calibration results and initial results from the ADMB and SDSS that were deployed during the MIZOPEX mission will be presented. These results include day-in-the-life tests, antenna pattern analysis, range tests, temperature measurement accuracy and initial scientific results from the campaign.

  6. Photovoltaic Manufacturing Consortium (PVMC) – Enabling America’s Solar Revolution

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Metacarpa, David

    The U.S. Photovoltaic Manufacturing Consortium (US-PVMC) is an industry-led consortium which was created with the mission to accelerate the research, development, manufacturing, field testing, commercialization, and deployment of next-generation solar photovoltaic technologies. Formed as part of the U.S. Department of Energy's (DOE) SunShot initiative, and headquartered in New York State, PVMC is managed by the State University of New York Polytechnic Institute (SUNY Poly) at the Colleges of Nanoscale Science and Engineering. PVMC is a hybrid of industry-led consortium and manufacturing development facility, with capabilities for collaborative and proprietary industry engagement. Through its technology development programs, advanced manufacturing development facilities,more » system demonstrations, and reliability and testing capabilities, PVMC has demonstrated itself to be a recognized proving ground for innovative solar technologies and system designs. PVMC comprises multiple locations, with the core manufacturing and deployment support activities conducted at the Solar Energy Development Center (SEDC), and the core Si wafering and metrology technologies being headed out of the University of Central Florida. The SEDC provides a pilot line for proof-of-concept prototyping, offering critical opportunities to demonstrate emerging concepts in PV manufacturing, such as evaluations of innovative materials, system components, and PV system designs. The facility, located in Halfmoon NY, encompasses 40,000 square feet of dedicated PV development space. The infrastructure and capabilities housed at PVMC includes PV system level testing at the Prototype Demonstration Facility (PDF), manufacturing scale cell & module fabrication at the Manufacturing Development Facility (MDF), cell and module testing, reliability equipment on its PV pilot line, all integrated with a PV performance database and analytical characterizations for PVMC and its partners test and commercial arrays. Additional development and deployment support are also housed at the SEDC, such as cost modeling and cost model based development activities for PV and thin film modules, components, and system level designs for reduced LCOE through lower installation hardware costs, labor reductions, soft costs and reduced operations and maintenance costs. The progression of the consortium activities started with infrastructure and capabilities build out focused on CIGS thin film photovoltaics, with a particular focus on flexible cell and module production. As marketplace changes and partners objectives shifted, the consortium shifted heavily towards deployment and market pull activities including Balance of System, cost modeling, and installation cost reduction efforts along with impacts to performance and DER operational costs. The consortium consisted of a wide array of PV supply chain companies from equipment and component suppliers through national developers and installers with a particular focus on commercial scale deployments (typically 25 to 2MW installations). With DOE funding ending after the fifth budget period, the advantages and disadvantages of such a consortium is detailed along with potential avenues for self-sustainability is reviewed.« less

  7. Very Low Head Turbine Deployment in Canada

    NASA Astrophysics Data System (ADS)

    Kemp, P.; Williams, C.; Sasseville, Remi; Anderson, N.

    2014-03-01

    The Very Low Head (VLH) turbine is a recent turbine technology developed in Europe for low head sites in the 1.4 - 4.2 m range. The VLH turbine is primarily targeted for installation at existing hydraulic structures to provide a low impact, low cost, yet highly efficient solution. Over 35 VLH turbines have been successfully installed in Europe and the first VLH deployment for North America is underway at Wasdell Falls in Ontario, Canada. Deployment opportunities abound in Canada with an estimated 80,000 existing structures within North America for possible low-head hydro development. There are several new considerations and challenges for the deployment of the VLH turbine technology in Canada in adapting to the hydraulic, environmental, electrical and social requirements. Several studies were completed to determine suitable approaches and design modifications to mitigate risk and confirm turbine performance. Diverse types of existing weirs and spillways pose certain hydraulic design challenges. Physical and numerical modelling of the VLH deployment alternatives provided for performance optimization. For this application, studies characterizing the influence of upstream obstacles using water tunnel model testing as well as full-scale prototype flow dynamics testing were completed. A Cold Climate Adaptation Package (CCA) was developed to allow year-round turbine operation in ice covered rivers. The CCA package facilitates turbine extraction and accommodates ice forces, frazil ice, ad-freezing and cold temperatures that are not present at the European sites. The Permanent Magnet Generator (PMG) presents some unique challenges in meeting Canadian utility interconnection requirements. Specific attention to the frequency driver control and protection requirements resulted in a driver design with greater over-voltage capability for the PMG as well as other key attributes. Environmental studies in Europe included fish friendliness testing comprised of multiple in-river live passage tests for a wide variety of fish species. Latest test results indicate fish passage survivability close to 100%. Further fish studies are planned in Canada later this year. Successful deployment must meet societal requirements to gain community acceptance and public approval. Aesthetics considerations include low noise, disguised control buildings and vigilant turbine integration into the low profile existing structures. The resulting design was selected for deployment at existing historic National Park waterway structures. The integration of all of these design elements permits the successful deployment of the VLH turbine in Canada.

  8. Power Hardware-in-the-Loop (PHIL) Testing Facility for Distributed Energy Storage (Poster)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Neubauer.J.; Lundstrom, B.; Simpson, M.

    2014-06-01

    The growing deployment of distributed, variable generation and evolving end-user load profiles presents a unique set of challenges to grid operators responsible for providing reliable and high quality electrical service. Mass deployment of distributed energy storage systems (DESS) has the potential to solve many of the associated integration issues while offering reliability and energy security benefits other solutions cannot. However, tools to develop, optimize, and validate DESS control strategies and hardware are in short supply. To fill this gap, NREL has constructed a power hardware-in-the-loop (PHIL) test facility that connects DESS, grid simulator, and load bank hardware to a distributionmore » feeder simulation.« less

  9. Development of an Integrated Toxicity Assessment System for use in Operational Deployment and Materials Development

    DTIC Science & Technology

    2006-05-01

    In addition to NBC concerns, there are issues in many current military settings for exposures to toxic industrial chemicals or materials (TICs or TIMs...Significant health issues caused by use of legacy chemicals have emphasized the need for more effective predication of chemical toxicity . This paper...current military settings for exposures to toxic industrial chemicals or materials (TICs or TIMs). Significant health issues caused by use of legacy

  10. Characterizing spouse/partner depression and alcohol problems over the course of military deployment.

    PubMed

    Erbes, Christopher R; Kramer, Mark; Arbisi, Paul A; DeGarmo, David; Polusny, Melissa A

    2017-04-01

    Spouse/partners of military personnel demonstrate elevated levels of distress during military deployments, yet there is insufficient information about courses of adjustment over time. The current study identified trajectories of depression and alcohol use problems and predictors of those trajectories across the deployment cycle. National Guard soldiers (N = 1973) and spouses/intimate partners (N = 1020) completed assessments of risk/protective factors and baseline measures of mental health functioning 2 to 5 months prior to soldiers' 1-year deployments (Time 1) to Kuwait/Iraq in support of Operation New Dawn or Afghanistan in support of Operation Enduring Freedom. Partners' mental health was reassessed at 4 months (Time 2) and 8 months (Time 3) after soldiers deployed, and both spouses/partners and soldiers were reassessed 2-3 months postdeployment (Time 4). Latent class growth modeling of partner depression symptoms over time revealed 4 groups: Resilience (79.9%), Deployment Distress (8.9%), Anticipatory Distress (8.4%), and Post-Deployment Distress (2.7%). Three alcohol misuse trajectories were identified: Resilience (91.3%), Deployment Onset (5.4%), and Deployment Desistance (3.3%). Predeployment predictors of partners' depression symptom trajectories varied by group and included soldier reports of stressors and social support and partner levels of neuroticism, introversion, disconstraint, and reported stressors. Predeployment predictors of alcohol misuse trajectories varied by group, and included soldier levels of alcohol misuse as well as partner neuroticism, disconstraint, and family readiness. Delineating and predicting trajectories of partner adjustment can allow for better targeted interventions toward those most at risk for heightened distress or alcohol problems over the deployment cycle. (PsycINFO Database Record (c) 2017 APA, all rights reserved).

  11. The Navy at a Tipping Point: Maritime Dominance at Stake?

    DTIC Science & Technology

    2010-03-01

    Navy" USN Deployment Strategy Future Global Environment for USN Operations External and Internal Drivers on USN Options Five Means for a "Global...Defense CARAT Deployment HCA cruises Counter-Dnjg oPs NAVSO/4 ,h Fleet Patmi NAVCENT/5,h Fleet GFS . . „ Horn of Global Fleet Station ...against advanced air defenses, conduct and enable littoral/amphibious operations in opposed environments , and establish blue-water dominance against

  12. Medical Surveillance Monthly Report (MSMR). Volume 15, Number 8, October 2008

    DTIC Science & Technology

    2008-10-01

    intense exposures to cold can signifi cantly impact the health, well-being and operational eff ectiveness of service members and their units.1-4 Because...performance in cold weather operations. Technical note no. TN/02-2. US Army Research Institute of Environmental Medicine, Natick, Massachusetts...status as reported on deployment health assesment forms, U.S. Armed Forces, October 2007-September 2008 Pre-deployment assessment DD2795 Post

  13. Deployment of 802.15.4 Sensor Networks for C4ISR Operations

    DTIC Science & Technology

    2006-06-01

    43 Figure 20.MSP410CA Dense Grid Monitoring (Crossbow User’s Manual, 2005). ....................................44 Figure 21.(a)MICA2 without...Deployment of Sensor Grid (COASTS OPORD, 2006). ...56 Figure 27.Topology View of Two Nodes and Base Station .......57 Figure 28.Nodes Employing Multi...Random Access Memory TCP/IP Transmission Control Protocol/Internet Protocol TinyOS Tiny Micro Threading Operating System UARTs Universal

  14. Combat experiences, pre-deployment training, and outcome of exposure therapy for post-traumatic stress disorder in Operation Enduring Freedom/Operation Iraqi Freedom veterans.

    PubMed

    Price, Matthew; Gros, Daniel F; Strachan, Martha; Ruggiero, Kenneth J; Acierno, Ron

    2013-01-01

    The association between exposure to multiple potentially traumatic events (PTEs) and subsequent increased risk of post-traumatic stress disorder (PTSD) is well established. However, less is known about the relation between exposure to numerous PTEs, as is typical with military service, and treatment outcome. Furthermore, there has been little research examining military specific protective factors, such as pre-deployment preparedness, on PTSD treatment response. The current study investigated combat exposure and potential moderators of treatment outcome for exposure therapy in Operation Enduring Freedom/Operation Iraqi Freedom (OEF/OIF) veterans with PTSD. One hundred and eleven OEF/OIF veterans diagnosed with PTSD participated in 8 weeks of exposure therapy. Results indicated that increased combat exposure was associated with a reduced rate of change in PTSD symptoms but not depression symptoms. These findings were consistent across two measures of combat exposure. There was preliminary support for the moderating effect of pre-deployment preparedness on the association between combat exposure and treatment response. Together, these findings suggest that increased combat exposure is associated with poor treatment response in veterans with PTSD; however, this can be reduced by elevated pre-deployment preparedness. Copyright © 2012 John Wiley & Sons, Ltd.

  15. 2015 Key Wind Program and National Laboratory Accomplishments

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Office of Energy Efficiency and Renewable Energy

    The U.S. Department of Energy (DOE) Wind Program is committed to helping the nation secure cost-competitive sources of renewable energy through the development and deployment of innovative wind power technologies. By investing in improvements to wind plant design, technology development, and operation as well as developing tools to identify the highest quality wind resources, the Wind Program serves as a leader in making wind energy technologies more competitive with traditional sources of energy and a larger part of our nation’s renewable energy portfolio.

  16. Guidance and Control Architecture Design and Demonstration for Low Ballistic Coefficient Atmospheric Entry

    NASA Technical Reports Server (NTRS)

    Swei, Sean

    2014-01-01

    We propose to develop a robust guidance and control system for the ADEPT (Adaptable Deployable Entry and Placement Technology) entry vehicle. A control-centric model of ADEPT will be developed to quantify the performance of candidate guidance and control architectures for both aerocapture and precision landing missions. The evaluation will be based on recent breakthroughs in constrained controllability/reachability analysis of control systems and constrained-based energy-minimum trajectory optimization for guidance development operating in complex environments.

  17. Tethered Satellite System (TSS-1R)-Post Flight (STS-75) Engineering Performance Report

    NASA Technical Reports Server (NTRS)

    Lavoie, Anthony R.

    1996-01-01

    The first mission of the Tethered Satellite deployer was flown onboard Atlantis in 1992 during the Space Transportation System (STS) flight STS-46. Due to a mechanical interference with the level wind mechanism the satellite was only Deployed to 256 m rather than the planned 20,000 m. Other problems were also experienced during the STS-46 flight and several modifications were made to the Deployer and Satellite. STS-75 was a reflight of the Tethered Satellite System 1 (TSS-1) designated as Tethered Satellite System 1 Reflight (TSS-1 R) onboard Columbia. As on STS-46, the TSS payload consisted of the Deployer, the Satellite, 3 cargo bay mounted experiments: Shuttle Electrodynamic Tether System (SETS), Shuttle Potential and Return Electron Experiment (SPREE), Deployer Core Equipment (DCORE) 4 Satellite mounted experiments: Research on Electrodynamics Tether Effects (RETE), Research on Orbital Plasma Electrodynamics (ROPE), Satellite Core Instruments (SCORE), Tether Magnetic Field Experiment (TEMAG) and an aft flight deck camera: Tether Optical Phenomena Experiment (TOP). Following successful pre-launch, launch and pre-deployment orbital operations, the Deployer deployed the Tethered Satellite to 19,695 m at which point the tether broke within the Satellite Deployment Boom (SDB). The planned length for On-Station I (OST1) was 20,700 m The Satellite flew away from the Orbiter with the tether attached. The satellite was "safed" and placed in a limited power mode via the RF link. The Satellite was contacted periodically during overflights of ground stations. Cargo bay science activities continued for the period of time allocated to TSS-1 R operations.

  18. Trillium Horizon, A Small Portable Observatory Grade Seismometer For Direct Bury And Vault Use

    NASA Astrophysics Data System (ADS)

    Moores, A.; Parker, T.; Bainbridge, G.

    2017-12-01

    As of August 2017 almost 5 years of data have been collected from broadband seismic sensors designed for direct burial applications. These first posthole instruments have been deployed in a wide range of extremely challenging environments such as dynamic ice and snow environments, extreme wet and dry conditions in soils of high clay content, and steep creeping terrain. In all use cases the direct burial approach has consistently provided high quality data when compared to shallow vault installations. In this presentation we extract and analyze operational performance data, including tilt information from mass position time series recorded at direct burial installations and at temporary shallow vault deployments. This data shows that while higher tilt tolerance is required for data quality outcome certainty in some installations, the majority of installations can be addressed by a smaller instrument with a narrower tilt range hence reducing size and cost. The lessons learned from this real world field data have guided the development of a new smaller, less expensive instrument, Trillium Horizon.Based on this analysis and and user feedback from many direct burial deployments, the Trillium Horizon seismometer has been developed as a simple versatile instrument to span the majority of deployment scenarios and specific use cases including shallow direct bury deployments, traditional piers, and problematic wet vault installs. With its small size, robust waterproof case and connector, +/-1.5° tilt range, dual-purpose cable, and accessories for both posthole and vault installation, Trillium Horizon is optimized for usability as well as performance.

  19. Deployment operation of NanTroSEIZE C0002 riserless LTBMS

    NASA Astrophysics Data System (ADS)

    Kyo, N.; Saruhashi, T.; Sawada, I.; Namba, Y.; Kitada, K.; Kimura, T.; Toczko, S.; Araki, E.; Kopf, A.; IODP EXP 332 Scientists

    2011-12-01

    The installation of LTBMS (Long Term Borehole Monitoring System) for NanTroSEIZE (Nankai Trough Seismogenic Zone Experiment) C0002 riserless hole was successfully carried out as part of IODP Expedition 332 operations by DV Chikyu in November - December 2010. The water depth of the site and penetration depth of the hole are 1937.5 m and 980 mbsf respectively. Casing (9-5/8") was set to the depth of 888 mbsf and below the CORK head, 3-1/2" tubing was deployed inside the casing as the support structure for the downhole instruments. Within the rat hole section, two pressure ports, a strain meter, a tilt meter, a broadband seismometer, geophone, and accelerometer were deployed. These seismic and geodetic sensors were set within the borehole, and coupled to the formation via cement whose physical properties (Young's modulus, Poisson's ratio, density) were adjusted to fit the formation's properties. Screen sections were set to access the pore fluids, while isolating them from the sea floor and the lower lithological units by a swellable packer, and cement, respectively. At the top of wellhead, and at the apex of the 3-1/2" tubing assembly, a CORK head was landed. The CORK head holds the pressure sensor unit (4 pressure sensors), underwater mateable data connectors (connected to the cemented sensors), and hydraulic valves to access and sample formation fluids by ROV. The major scientific features of the Hole C0002G (riserless) LTBMS are sensors monitoring multiple parameters related to seismic, geodetic and pore fluid behavior simultaneously at distinct, multiple, layers within the same borehole. The main technical difficulties in the LTBMS development are as follows: (1) Reduction method for current-induced VIV (Vortex Induced Vibration) (2) Borehole coupling for seismic and geodetic sensors (3) Anti-vibration/shock and protection method for borehole sensors/instruments (4) Attachment and protection for sensor cables and pressure lines (5) Zone isolation for multi-layer pressure measurements (6) Wellhead system (CORK) for data connection to submarine cable network (7) Downsizing borehole instruments (installation with 3-1/2-in tubing) (8) System reliability (redundant sensor system) We carried out sea trials using a dummy sensor assembly to study the effects of deploying the assembly in strong currents, and also carried out additional pool experiments and numerical simulations to evaluate VIV countermeasures. Through shock and vibration mechanical tests, we improved the robustness of sensors and the sensor carrier. As part of these investigations, we conducted risk analysis based on the operation, science, and engineering points of view from, which helped clarify operational procedures for actual deployment. Future plans include returning to Hole C0002G site to deploy a data logger and battery for temporary observations. After examining the data quality, we'll finally connect the LTBMS to the DONET (Dense Oceanfloor Network System for Earthquakes and Tsunamis) submarine cabled network. Plans are also underway for deploying more LTBMS's into Site C0010 (riserless) and Site C0002 (riser).

  20. What explains post-traumatic stress disorder (PTSD) in UK service personnel: deployment or something else?

    PubMed

    Jones, M; Sundin, J; Goodwin, L; Hull, L; Fear, N T; Wessely, S; Rona, R J

    2013-08-01

    In previous studies an association between deployment to Iraq or Afghanistan and an overall increased risk for post-traumatic stress disorder (PTSD) in UK armed forces has not been found. The lack of a deployment effect might be explained by including, in the comparison group, personnel deployed on other operations or who have experienced traumatic stressors unrelated to deployment. The sample comprised 8261 regular UK armed forces personnel who deployed to Iraq, Afghanistan or other operational areas or were not deployed. Participants completed the PTSD CheckList-Civilian Version (PCL-C) and provided information about deployment history, demographic and service factors, serious accidents and childhood experiences. Deployment to Iraq or Afghanistan [odds ratio (OR) 1.2, 95% confidence interval (CI) 0.6-2.2] or elsewhere (OR 1.1, 95% CI 0.6-2.0) was unrelated to PTSD although holding a combat role was associated with PTSD if deployed to Iraq or Afghanistan (OR 2.7, 95% CI 1.9-3.9). Childhood adversity (OR 3.3, 95% CI 2.1-5.0), having left service (OR 2.7, 95% CI 1.9-4.0) and serious accident (OR 2.1, 95% CI 1.4-3.0) were associated with PTSD whereas higher rank was protective (OR 0.3, 95% CI 0.12-0.76). For the majority of UK armed forces personnel, deployment whether to Iraq, Afghanistan or elsewhere confers no greater risk for PTSD than service in the armed forces per se but holding a combat role in those deployed to Iraq or Afghanistan is associated with PTSD. Vulnerability factors such as lower rank, childhood adversity and leaving service, and having had a serious accident, may be at least as important as holding a combat role in predicting PTSD in UK armed forces personnel.

  1. Use of inpatient psychiatric services on a U.S. Army combat support post during Operations Desert Shield and Desert Storm: the stress of non-deployment.

    PubMed

    Koshes, R J; Rothberg, J M

    1994-06-01

    We studied the utilization of inpatient psychiatric services during Operations Desert Shield and Desert Storm (the Persian Gulf War of 1990-1991) on a U.S. Army combat support post. Inpatient psychiatric admissions and dispositions for the post's catchment area were tallied before, during, and after Operations Desert Shield and Desert Storm. Subjects included active duty soldiers (deployed soldiers were not studied while they were away from the post), their families, and retirees. Overall, there was no increase in psychiatric hospitalizations for active duty soldiers, their family members, or retirees. However, coincident with the return of soldiers from Operations Desert Shield and Desert Storm, the psychiatric proportion of all hospitalizations increased in the subpopulation of soldiers not deployed who had served less than 1 year. These soldiers in training may be more susceptible to increased stress levels associated with the return of soldiers from war because of their inadequate group bonding.

  2. Considerations for developing technologies for an integrated person-borne IED countermeasure architecture

    NASA Astrophysics Data System (ADS)

    Lombardo, Nicholas J.; Knudson, Christa K.; Rutz, Frederick C.; Pattison, Kerrie J.; Stratton, Rex C.; Wiborg, James C.

    2010-04-01

    Developing an integrated person-borne improvised explosive device (IED) countermeasure to protect unstructured crowds at large public venues is the goal of the Standoff Technology Integration and Demonstration Program (STIDP), sponsored in part by the U.S. Department of Homeland Security (DHS). The architecture being developed includes countermeasure technologies deployed as a layered defense and enabling technologies for operating the countermeasures as an integrated system. In the architecture, early recognition of potentially higher-risk individuals is crucial. Sensors must be able to detect, with high accuracy, explosives' threat signatures in varying environmental conditions, from a variety of approaches and with dense crowds and limited dwell time. Command-and-control technologies are needed to automate sensor operation, reduce staffing requirements, improve situational awareness, and automate/facilitate operator decisions. STIDP is developing technical and operational requirements for standoff and remotely operated sensors and is working with federal agencies and foreign governments to implement these requirements into their research and development programs. STIDP also is developing requirements for a software platform to rapidly integrate and control various sensors; acquire, analyze, and record their data; and present the data in an operationally relevant manner. Requirements also are being developed for spatial analysis, tracking and assessing threats with available screening resources, and data fusion for operator decision-making.

  3. The Early Development of Satellite Characterization Capabilities at the Air Force Laboratories

    NASA Astrophysics Data System (ADS)

    Lambert, J.; Kissell, K.

    This presentation overviews the development of optical Space Object Identification (SOI) techniques at the Air Force laboratories during the two-decade "pre-operational" period prior to 1980 when the Groundbased Electro-Optical Deep Space Surveillance (GEODSS) sensors were deployed. Beginning with the launch of Sputnik in 1957, the United States Air Force has actively pursued the development and application of optical sensor technology for the detection, tracking, and characterization of artificial satellites. Until the mid-1980s, these activities were primarily conducted within Air Force research and development laboratories which supplied data to the operational components on a contributing basis. This presentation traces the early evolution of the optical space surveillance technologies from the early experimental sensors that led to the current generation of operationally deployed and research systems. The contributions of the participating Air Force organizations and facilities will be reviewed with special emphasis on the development of technologies for the characterization of spacecraft using optical signatures and imagery. The presentation will include descriptions and photographs of the early facilities and instrumentation, and examples of the SOI collection and analysis techniques employed. In this early period, computer support was limited so all aspects of space surveillance relied heavily on manual interaction. Many military, government, educational, and contractor agencies supported the development of instrumentation and analysis techniques. This overview focuses mainly on the role played by Air Force System Command and Office of Aerospace Research, and the closely related activities at the Department of Defense Advanced Research Projects Agency. The omission of other agencies from this review reflects the limitations of this presentation, not the significance of their contributions.

  4. An Assessment of Integrated Health Management (IHM) Frameworks

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    N. Lybeck; M. Tawfik; L. Bond

    In order to meet the ever increasing demand for energy, the United States nuclear industry is turning to life extension of existing nuclear power plants (NPPs). Economically ensuring the safe, secure, and reliable operation of aging nuclear power plants presents many challenges. The 2009 Light Water Reactor Sustainability Workshop identified online monitoring of active and structural components as essential to the better understanding and management of the challenges posed by aging nuclear power plants. Additionally, there is increasing adoption of condition-based maintenance (CBM) for active components in NPPs. These techniques provide a foundation upon which a variety of advanced onlinemore » surveillance, diagnostic, and prognostic techniques can be deployed to continuously monitor and assess the health of NPP systems and components. The next step in the development of advanced online monitoring is to move beyond CBM to estimating the remaining useful life of active components using prognostic tools. Deployment of prognostic health management (PHM) on the scale of a NPP requires the use of an integrated health management (IHM) framework - a software product (or suite of products) used to manage the necessary elements needed for a complete implementation of online monitoring and prognostics. This paper provides a thoughtful look at the desirable functions and features of IHM architectures. A full PHM system involves several modules, including data acquisition, system modeling, fault detection, fault diagnostics, system prognostics, and advisory generation (operations and maintenance planning). The standards applicable to PHM applications are indentified and summarized. A list of evaluation criteria for PHM software products, developed to ensure scalability of the toolset to an environment with the complexity of a NPP, is presented. Fourteen commercially available PHM software products are identified and classified into four groups: research tools, PHM system development tools, deployable architectures, and peripheral tools.« less

  5. Case for Deploying Complex Systems Utilizing Commodity Components

    NASA Technical Reports Server (NTRS)

    Bryant, Barry S.; Pitts, R. Lee

    2003-01-01

    When the International Space Station (ISS) finally reached an operational state, many of the Payload Operations and Integration Facility (POIF) hardware components were reaching end of life, COTS product costs were soaring, and the ISS budget was becoming severely constrained. However, most requirement development was complete. In addition, the ISS program is a fully functioning program with at least fifteen years of operational life remaining. Therefore it is critical that any upgrades, refurbishments, or enhancements be accomplished in realtime with minimal disruptions to service. For these and other reasons, it was necessary to ensure the viability of the POIF. Due to the to the breadth of capability of the POIF (a NASA ground station), it is believed that the lessons to be learned by other complex systems are applicable and any solutions garnered by the POIF are applicable to other complex systems as well. With that in mind, a number of new approaches have been investigated to increase the portability of the POIF and reduce the cost of refurbishment, operations, and maintenance. These new approaches were directed at the Total Cost of Ownership (TCO); not only the refurbishment but also current operational difficulties, licensing, and anticipation of the next refurbishment. Our basic premise is that technology had evolved dramatically since the concept of the POIF ground system and we should leverage our experience on this new technological landscape. Fortunately, Moore's law and market forces have changed the landscape considerably. These changes are manifest in five (5) ways that are particularly relevant to POIF: 1. Complex Instruction Set Computing (CISC) processors have advanced to unprecedented levels of compute capacity with a dramatic cost break, 2. Linux has become a major operating system supported by most vendors on a broad range of platforms, 3. Windows(TradeMark) based desktops are pervasive in the office environment, 4. Stable and affordable WindowsTM development environments and tools are available and offer a rich set of capabilities, 5. The WindowsTM 2000 provides a stable client platform, Therefore, five studies were proposed, developed, and are in the current process of deployment which dramatically reduces the cost of operations, maintenance, refurbishment, and deployment of a ground system. Restating and refining the basic premise stated earlier, it is possible to enhance operations through the replacement of hardware and software components with commodity based items wherever applicable. This will dramatically reduce the overall lifecycle cost of the project. The first study leveraged the POIF S secure, three-tier, web architecture to replace the client workstations with lower cost PC platforms. A second study initiated a review of COTS products to examine the level of added value of each product. This study included replacement of some COTS products with custom code, deletions, substitutions, and consolidation of COTS products. Studies three and four reviewed the server architectures of the data distribution systems and Enhanced HOSC System (EHS) command and telemetry system to propose migration to new platforms, both software and hardware. The final study reviewed current IP communication technologies, developed an operational model for flight operations, and demonstrated that voice over IP was practical and could be integrated into operations.

  6. Using a Delphi approach to develop a strategy for A&E in defence nursing.

    PubMed

    Kenward, Gary; Berry, Andy; Despres, Julian; McLeod, Judith

    The Armed Forces has seen an increase in the number of operational deployments overseas and a greater demand for Accident and Emergency (A&E) trained nurses. This article describes a modified Delphi study used to contribute to the development of a strategy for emergency nursing in the Defence Nursing Services. Twenty-eight A&E specialists took part and the key issues raised were recruitment and retention, staff development, new roles, research priorities, increased internal recruitment of A&E nurses to meet operational demands, and the need for a structured career pathway to help retention. The most pressing areas requiring research were evaluation of the nurse practitioner role, clinical competencies and managing heat injuries in the operational setting. The modified Delphi study provided a valuable and detailed insight into the challenges and aspirations of the military A&E nursing cadre and has assisted in developing a strategy for emergency nursing.

  7. Software platform virtualization in chemistry research and university teaching

    PubMed Central

    2009-01-01

    Background Modern chemistry laboratories operate with a wide range of software applications under different operating systems, such as Windows, LINUX or Mac OS X. Instead of installing software on different computers it is possible to install those applications on a single computer using Virtual Machine software. Software platform virtualization allows a single guest operating system to execute multiple other operating systems on the same computer. We apply and discuss the use of virtual machines in chemistry research and teaching laboratories. Results Virtual machines are commonly used for cheminformatics software development and testing. Benchmarking multiple chemistry software packages we have confirmed that the computational speed penalty for using virtual machines is low and around 5% to 10%. Software virtualization in a teaching environment allows faster deployment and easy use of commercial and open source software in hands-on computer teaching labs. Conclusion Software virtualization in chemistry, mass spectrometry and cheminformatics is needed for software testing and development of software for different operating systems. In order to obtain maximum performance the virtualization software should be multi-core enabled and allow the use of multiprocessor configurations in the virtual machine environment. Server consolidation, by running multiple tasks and operating systems on a single physical machine, can lead to lower maintenance and hardware costs especially in small research labs. The use of virtual machines can prevent software virus infections and security breaches when used as a sandbox system for internet access and software testing. Complex software setups can be created with virtual machines and are easily deployed later to multiple computers for hands-on teaching classes. We discuss the popularity of bioinformatics compared to cheminformatics as well as the missing cheminformatics education at universities worldwide. PMID:20150997

  8. Software platform virtualization in chemistry research and university teaching.

    PubMed

    Kind, Tobias; Leamy, Tim; Leary, Julie A; Fiehn, Oliver

    2009-11-16

    Modern chemistry laboratories operate with a wide range of software applications under different operating systems, such as Windows, LINUX or Mac OS X. Instead of installing software on different computers it is possible to install those applications on a single computer using Virtual Machine software. Software platform virtualization allows a single guest operating system to execute multiple other operating systems on the same computer. We apply and discuss the use of virtual machines in chemistry research and teaching laboratories. Virtual machines are commonly used for cheminformatics software development and testing. Benchmarking multiple chemistry software packages we have confirmed that the computational speed penalty for using virtual machines is low and around 5% to 10%. Software virtualization in a teaching environment allows faster deployment and easy use of commercial and open source software in hands-on computer teaching labs. Software virtualization in chemistry, mass spectrometry and cheminformatics is needed for software testing and development of software for different operating systems. In order to obtain maximum performance the virtualization software should be multi-core enabled and allow the use of multiprocessor configurations in the virtual machine environment. Server consolidation, by running multiple tasks and operating systems on a single physical machine, can lead to lower maintenance and hardware costs especially in small research labs. The use of virtual machines can prevent software virus infections and security breaches when used as a sandbox system for internet access and software testing. Complex software setups can be created with virtual machines and are easily deployed later to multiple computers for hands-on teaching classes. We discuss the popularity of bioinformatics compared to cheminformatics as well as the missing cheminformatics education at universities worldwide.

  9. A Survey of Recent MARTe Based Systems

    NASA Astrophysics Data System (ADS)

    Neto, André C.; Alves, Diogo; Boncagni, Luca; Carvalho, Pedro J.; Valcarcel, Daniel F.; Barbalace, Antonio; De Tommasi, Gianmaria; Fernandes, Horácio; Sartori, Filippo; Vitale, Enzo; Vitelli, Riccardo; Zabeo, Luca

    2011-08-01

    The Multithreaded Application Real-Time executor (MARTe) is a data driven framework environment for the development and deployment of real-time control algorithms. The main ideas which led to the present version of the framework were to standardize the development of real-time control systems, while providing a set of strictly bounded standard interfaces to the outside world and also accommodating a collection of facilities which promote the speed and ease of development, commissioning and deployment of such systems. At the core of every MARTe based application, is a set of independent inter-communicating software blocks, named Generic Application Modules (GAM), orchestrated by a real-time scheduler. The platform independence of its core library provides MARTe the necessary robustness and flexibility for conveniently testing applications in different environments including non-real-time operating systems. MARTe is already being used in several machines, each with its own peculiarities regarding hardware interfacing, supervisory control configuration, operating system and target control application. This paper presents and compares the most recent results of systems using MARTe: the JET Vertical Stabilization system, which uses the Real Time Application Interface (RTAI) operating system on Intel multi-core processors; the COMPASS plasma control system, driven by Linux RT also on Intel multi-core processors; ISTTOK real-time tomography equilibrium reconstruction which shares the same support configuration of COMPASS; JET error field correction coils based on VME, PowerPC and VxWorks; FTU LH reflected power system running on VME, Intel with RTAI.

  10. 90-94 ITS Intercity Corridor Study - Strategic Deployment Plan

    DOT National Transportation Integrated Search

    1996-12-01

    PUBLIC-PRIVATE PARTNERSHIP, COMMERCIAL VEHICLES OPERATIONS OR CVO : THE IH 90/94 ITS INTERCITY CORRIDOR STRATEGIC DEPLOYMENT PLAN IS AN APPROACH FOR IMPLEMENTING INTELLIGENT TRANSPORTATION SYSTEMS (ITS) IN THE IH 90/94 CORRIDORS THAT TRAVERSE THE ...

  11. Deployment strategies of managed lanes on arterials.

    DOT National Transportation Integrated Search

    2015-02-01

    This report investigates issues related to planning, financing, deployment, and operation of managed : lanes on arterials. In this report, a strategy for managed lanes refers to a combination of the managed : lane type, the design and implementation,...

  12. Deploy Nalu/Kokkos algorithmic infrastructure with performance benchmarking.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Domino, Stefan P.; Ananthan, Shreyas; Knaus, Robert C.

    The former Nalu interior heterogeneous algorithm design, which was originally designed to manage matrix assembly operations over all elemental topology types, has been modified to operate over homogeneous collections of mesh entities. This newly templated kernel design allows for removal of workset variable resize operations that were formerly required at each loop over a Sierra ToolKit (STK) bucket (nominally, 512 entities in size). Extensive usage of the Standard Template Library (STL) std::vector has been removed in favor of intrinsic Kokkos memory views. In this milestone effort, the transition to Kokkos as the underlying infrastructure to support performance and portability onmore » many-core architectures has been deployed for key matrix algorithmic kernels. A unit-test driven design effort has developed a homogeneous entity algorithm that employs a team-based thread parallelism construct. The STK Single Instruction Multiple Data (SIMD) infrastructure is used to interleave data for improved vectorization. The collective algorithm design, which allows for concurrent threading and SIMD management, has been deployed for the core low-Mach element- based algorithm. Several tests to ascertain SIMD performance on Intel KNL and Haswell architectures have been carried out. The performance test matrix includes evaluation of both low- and higher-order methods. The higher-order low-Mach methodology builds on polynomial promotion of the core low-order control volume nite element method (CVFEM). Performance testing of the Kokkos-view/SIMD design indicates low-order matrix assembly kernel speed-up ranging between two and four times depending on mesh loading and node count. Better speedups are observed for higher-order meshes (currently only P=2 has been tested) especially on KNL. The increased workload per element on higher-order meshes bene ts from the wide SIMD width on KNL machines. Combining multiple threads with SIMD on KNL achieves a 4.6x speedup over the baseline, with assembly timings faster than that observed on Haswell architecture. The computational workload of higher-order meshes, therefore, seems ideally suited for the many-core architecture and justi es further exploration of higher-order on NGP platforms. A Trilinos/Tpetra-based multi-threaded GMRES preconditioned by symmetric Gauss Seidel (SGS) represents the core solver infrastructure for the low-Mach advection/diffusion implicit solves. The threaded solver stack has been tested on small problems on NREL's Peregrine system using the newly developed and deployed Kokkos-view/SIMD kernels. fforts are underway to deploy the Tpetra-based solver stack on NERSC Cori system to benchmark its performance at scale on KNL machines.« less

  13. Sea Bed Drilling Technology MARUM-MeBo: Overview on recent scientific drilling campaigns and technical developments

    NASA Astrophysics Data System (ADS)

    Freudenthal, Tim; Bergenthal, Markus; Bohrmann, Gerhard; Pape, Thomas; Kopf, Achim; Huhn-Frehers, Katrin; Gohl, Karsten; Wefer, Gerold

    2017-04-01

    The MARUM-MeBo (abbreviation for Meeresboden-Bohrgerät, the German expression for seafloor drill rig) is a robotic drilling system that is developed since 2004 at the MARUM Center for Marine Environmental Sciences at the University of Bremen in close cooperation with Bauer Maschinen GmbH and other industry partners. The MARUM-MeBo drill rigs can be deployed from multipurpose research vessel like, RV MARIA S. MERIAN, RV METEOR, RV SONNE and RV POLARSTERN and are used for getting long cores both in soft sediments as well as hard rocks in the deep sea. The first generation drill rig, the MARUM-MeBo70 is dedicated for a drilling depth of more than 70 m (Freudenthal and Wefer, 2013). Between 2005 and 2016 it was deployed on 17 research expeditions and drilled about 3 km into different types of geology including carbonate and crystalline rocks, gas hydrates, glacial tills, sands and gravel, glacial till and hemipelagic mud with an average recovery rate of about 70 %. We used the development and operational experiences of MARUM-MeBo70 for the development of a second generation drill rig MARUM-MeBo200. This drill rig is dedicated for conducting core drilling down to 200 m below sea floor. After successful sea trials in the North Sea in October 2014 the MeBo200 was used on a scientific expedition on the research vessel RV SONNE (SO247) in March/April 2016. During 12 deployments we drilled altogether 514 m in hemipelagic sediments with volcanic ashes as well as in muddy and sandy slide deposits off New Zealand. The average core recovery was about 54%. The maximum drilling depth was 105 m below sea floor. Developments for the MeBo drilling technology include the development of a pressure core barrel that was successfully deployed on two research expeditions so far. Bore hole logging adds to the coring capacity. Several autonomous logging probes have been developed in the last years for a deployment with MeBo in the logging while tripping mode - a sonic probe measuring in situ p-wave velocity being the latest development. Various bore hole monitoring systems where developed and deployed with the MeBo system. They allow for long-term monitoring of pressure variability within the sealed bore holes. References: Freudenthal, T and Wefer, G (2013) Drilling cores on the sea floor with the remote-controlled sea floor drilling rig MeBo. Geoscientific Instrumentation, Methods and Data Systems, 2(2). 329-337. doi:10.5194/gi-2-329-2013

  14. Analysis and Evaluation of Deployment Mechanism of a Tiny Rover in a Microgravity by Drop Tower Experiments

    NASA Astrophysics Data System (ADS)

    Nagaoka, Kenji; Yano, Hajime; Yoshimitsu, Tetsuo; Yoshida, Kazuya; Kubota, Takashi; Adachi, Tadashi; Kurisu, Masamitsu; Yatsunami, Hiroyuki; Kuroda, Yoji

    This presentation introduces the analysis and evaluation of a deployment mechanism of a tiny rover by ZARM drop tower experiments. The mechanism is installed on the MINERVA-II2 system in the Hayabusa-2 project performed by JAXA. The MINERVA-II2 system includes a small exploration rover, and the rover will be released from the Hayabusa-2 spacecraft to the asteroid surface. After the rover lands on the surface, it will move over the surface and conduct scientific measurements. To achieve such a challenging mission, the deployment mechanism of the rover is one of the significant components. In particular, controlling the rover's landing velocity against the asteroid surface is required with high-reliability mechanism. In the MINERVA-II2 system, a reliable deployment mechanism using a metal spring is installed. By the simple mechanism, the rover's releasing velocity will be controlled within a required value. Although the performance evaluation and analysis are necessary before launch, it is difficult to experiment the deployment performance three-dimensionally on ground. In the MINERVA-II2 project, with the cooperation of ZARM, DLR and JAXA, we conducted microgravity experiments using a ZARM drop tower to examine the deployment performance in a three-dimensional microgravity. During the experiments, motion of the deployment mechanism and the rover were captured by an external camera mounted on the dropping chamber. After the drop, we analyzed the rover's releasing velocity based on image processing of the camera data. The experimental results confirmed that the deployment mechanism is feasible and reliable for controlling the rover's releasing velocity. In addition to the experiments, we analyzed a mechanical friction resistance of the mechanism from a theoretical viewpoint. These results contribute to design of spring stiffness and feedback to the development of the MINERVA-II2 flight model. Finally, the drop tower experiments were accomplished based on the agreement on the Hayabusa-2 project by DLR-JAXA. The chamber for the experiments was used, which was developed by the Hayabusa-2 project. In the experiments, we received technical and operations supports from ZARM. We sincerely express our acknowledgement to ZARM, DLR and JAXA.

  15. Development of deployable structures for large space platforms. Volume 2: Design development

    NASA Technical Reports Server (NTRS)

    Greenberg, H. S.

    1983-01-01

    Design evolution, test article design, test article mass properties, and structural analysis of deployable platform systems are discussed. Orbit transfer vehicle (OTV) hangar development, OTV hangar concept selection, and manned module development are discussed. Deployable platform systems requirements, material data base, technology development needs, concept selection and deployable volume enclosures are also discussed.

  16. Developing a Measure to Assess Emotions Associated with Never Being Deployed.

    PubMed

    Hoopsick, Rachel A; Homish, D Lynn; Bartone, Paul T; Homish, Gregory G

    2018-03-14

    Much research has focused on stress related to deployments; however, a substantial proportion of soldiers never deploy. In a study of 1.3 million veterans, suicide risk was higher among veterans who had never deployed. Thus, not being deployed may have an impact on soldiers' well-being; however, no measures exist to assess emotions regarding non-deployment. We aimed to develop and test an original measure of non-deployment emotions. We examined the Non-Deployment Emotions (NDE) questionnaire, a novel four-item measure of guilt, unit value, unit camaraderie, and unit connectedness in a sample of never-deployed male and female US Army Reserve/National Guard (USAR/NG) soldiers (N = 174). Data are from Operation: SAFETY (Soldiers and Families Excelling Through the Years), an ongoing survey-based study examining the health of USAR/NG soldiers and their partners. The protocol was approved by the Institutional Review Board at the State University of New York at Buffalo. The relationship between each of the items was examined by calculating correlation and alpha coefficients. Latent class analyses tested for the existence of distinct levels of negative emotions related to non-deployment. Negative binomial regression models examined the cross-sectional associations between NDE summary score and each of the following outcomes, separately: anger, anxiety, depression, and post-traumatic stress. More than half of never-deployed USAR/NG soldiers expressed negative emotions for having not been deployed. "Guilt," "value," "camaraderie," and "connectedness" were each positively correlated with each other (p < 0.001) and the internal consistency reliability was high (male soldier α = 0.90, female soldier α = 0.93). Latent class analyses revealed a superior three-class model with well-delineated class membership (entropy = 0.93): "Class 1" (low NDE; 47.6%), "Class 2" (moderate NDE; 33.8%), and "Class 3" (high NDE; 18.6%). Regression models demonstrated that greater non-deployment emotions were independently associated with more severe anger (RR = 1.02, 95% CI: 1.01, 1.03, p < 0.001), anxiety (RR = 1.06, 95% CI: 1.01, 1.11, p < 0.05), depression (RR = 1.06, 95% CI: 1.01, 1.11, p < 0.05), and PTSD (RR = 1.10, 95% CI: 1.04, 1.16, p < 0.01). Findings demonstrate that negative emotions regarding non-deployment are prevalent among never-deployed USAR/NG soldiers and that these emotions are related to a mental health. The NDE provides a measure of "guilt," "value," "camaraderie," and "connectedness" specific to non-deployed soldiers and is able to well discriminate between soldiers that have low, moderately, and highly negative non-deployment emotions. These findings suggest that all military personnel, regardless of deployment status, could be at risk for negative outcomes. As with any survey-based study, there is a potential for response bias; however, given the range of responses collected with the NDE, social desirability is unlikely. Further work is needed to confirm our findings in other components of the military and to examine soldiers in the rear detachment.

  17. Core Design Characteristics of the Fluoride Salt-Cooled High Temperature Demonstration Reactor

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Brown, Nicholas R; Qualls, A L; Betzler, Benjamin R

    2016-01-01

    Fluoride salt-cooled high temperature reactors (FHRs) are a promising reactor technology option with significant knowledge gaps to implementation. One potential approach to address those technology gaps is via a small-scale demonstration reactor with the goal of increasing the technology readiness level (TRL) of the overall system for the longer term. The objective of this paper is to outline a notional concept for such a system, and to address how the proposed concept would advance the TRL of FHR concepts. Development of the proposed FHR Demonstration Reactor (DR) will enable commercial FHR deployment through disruptive and rapid technology development and demonstration.more » The FHR DR will close remaining gaps to commercial viability. Lower risk technologies are included in the initial FHR DR design to ensure that the reactor can be built, licensed, and operated within an acceptable budget and schedule. Important capabilities that will be demonstrated by building and operating the FHR DR include core design methodologies; fabrication and operation of high temperature reactors; salt procurement, handling, maintenance, and ultimate disposal; salt chemistry control to maximize vessel life; tritium management; heat exchanger performance; pump performance; and reactivity control. The FHR DR is considered part of a broader set of FHR technology development and demonstration efforts, some of which are already underway. Nonreactor test efforts (e.g., heated salt loops or loops using simulant fluids) can demonstrate many technologies necessary for commercial deployment of FHRs. The FHR DR, however, fulfills a crucial role in FHR technology development by advancing the technical maturity and readiness level of the system as a whole.« less

  18. Validation of Scales from the Deployment Risk and Resilience Inventory in a Sample of Operation Iraqi Freedom Veterans

    ERIC Educational Resources Information Center

    Vogt, Dawne S.; Proctor, Susan P.; King, Daniel W.; King, Lynda A.; Vasterling, Jennifer J.

    2008-01-01

    The Deployment Risk and Resilience Inventory (DRRI) is a suite of scales that can be used to assess deployment-related factors implicated in the health and well-being of military veterans. Although initial evidence for the reliability and validity of DRRI scales based on Gulf War veteran samples is encouraging, evidence with respect to a more…

  19. Employing the Army Health System Outside the Main Gate

    DTIC Science & Technology

    2014-05-22

    Publications and Forms , http://armypubs.army.mil/ doctrine/ADRP_1.html (accessed 5 September 2013), 2-10. 9...of the HSS and FHP missions for training, pre-deployment, deployment, and post-deployment operations. The AHS includes all mission support services...performed, provided, or arranged by the AMEDD to support HSS and FHP mission requirements for the Army and as directed, for joint, intergovernmental

  20. Causes of Death in Military Working Dogs During Operation Iraqi Freedom and Operation Enduring Freedom, 2001-2013.

    PubMed

    Miller, Laura; Pacheco, Gerardo J; C Janak, Jud; Grimm, Rose C; Dierschke, Nicole A; Baker, Janice; Orman, Jean A

    2018-03-14

    Military working dogs (MWDs) are a major asset in the theater of operations. Their unique abilities make them ideal for tasks such as tracking, patrol, and scent detection. MWDs deployed to a war zone are exposed to harsh environments and battlefield dangers that increase their risk of disease, injuries, and death. Although canines have been used extensively in Operation Iraqi Freedom (OIF) and Operation Enduring Freedom (OEF), no published studies have reported detailed causes of death among MWDs deployed to these conflicts. Potential cases were defined as U.S. military-owned MWDs that died while deployed in Iraq (OIF) or Afghanistan (OEF) from January 1, 2001 through December 31, 2013 and identified from both official sources and unofficial sources, that is, online searches. Cases included in this study were limited to MWDs with data on cause of death obtained by abstraction from official veterinary treatment records (VTRs) from the Department of Defense Military Working Dog Veterinary Service, Joint Base San Antonio-Lackland Air Force Base, San Antonio, Texas, and Special Operations Forces units. We identified 92 MWDs that died while deployed to OEF/OIF from 2001 through 2013 and had cause of death information from official VTRs. For both OEF and OIF, the most common training program was Multi-Purpose Canine (36.5% and 51.7%, respectively), followed by Improvised Explosive Detector Dog for OEF (34.9%) and Patrol Explosive Detector Dog for OIF (34.5%). Injuries were the primary cause of death for 77.2% of the MWDs for which we had cause of death data. The most frequent external injuries were gunshot wounds (GSW) (31.5%), explosion or blast (26.1%), and heat stress (9.8%). The proportion of deaths due to GSW was similar for OEF and OIF (30.2% vs. and 34.5%, respectively). However, a greater proportion of MWDs died from explosions during OEF than during OIF (30.2% vs. 17.2%, respectively). Diseases were the cause of death in 23.0% of the MWDs. The most common diseases were gastric dilation and volvulus (GDV, n = 3), pleuritis (n = 2), and sepsis (n = 3). Two deaths were associated with anesthesia-related medical procedures. A total of 8.7% of cases were missing cause of death, 8.7% were missing age, 32.6% of cases were missing data on necropsy, and 14.1% were missing data on final disposition of the body. Other variables of interest including number of deployments and duration of training had a very high proportion of missing values and thus could not be analyzed. Our study is the most comprehensive to date that reports causes of death of MWDs deployed to OIF and OEF. However, limitations in the available data lessen the potential of our results to inform improvements in training and point of injury medical care. Better documentation in VTRs and systematic data collection into an official MWD trauma registry could lead to improved training and facilitate further development and evaluation of guidelines to improve care of wounded MWDs in future conflicts.

  1. Paving the Way for Small Satellite Access to Orbit: Cyclops' Deployment of SpinSat, the Largest Satellite Ever Deployed from the International Space Station

    NASA Technical Reports Server (NTRS)

    Hershey, Matthew P.; Newswander, Daniel R.; Smith, James P.; Lamb, Craig R.; Ballard, Perry G.

    2015-01-01

    The Space Station Integrated Kinetic Launcher for Orbital Payload Systems (SSIKLOPS), known as "Cyclops" to the International Space Station (ISS) community, successfully deployed the largest satellite ever (SpinSat) from the ISS on November 28, 2014. Cyclops, a collaboration between the NASA ISS Program, NASA Johnson Space Center Engineering, and Department of Defense Space Test Program (DoD STP) communities, is a dedicated 10-100 kg class ISS small satellite deployment system. This paper will showcase the successful deployment of SpinSat from the ISS. It will also outline the concept of operations, interfaces, requirements, and processes for satellites to utilize the Cyclops satellite deployment system.

  2. Monitoring the bending and twist of morphing structures

    NASA Astrophysics Data System (ADS)

    Smoker, J.; Baz, A.

    2008-03-01

    This paper presents the development of the theoretical basis for the design of sensor networks for determining the 2-dimensioal shape of morphing structures by monitoring simultaneously the bending and twist deflections. The proposed development is based on the non-linear theory of finite elements to extract the transverse linear and angular deflections of a plate-like structure. The sensors outputs are wirelessly transmitted to the command unit to simultaneously compute maps of the linear and angular deflections and maps of the strain distribution of the entire structure. The deflection and shape information are required to ascertain that the structure is properly deployed and that its surfaces are operating wrinkle-free. The strain map ensures that the structure is not loaded excessively to adversely affect its service life. The developed theoretical model is validated experimentally using a prototype of a variable cambered span morphing structure provided with a network of distributed sensors. The structure/sensor network system is tested under various static conditions to determine the response characteristics of the proposed sensor network as compared to other conventional sensor systems. The presented theoretical and experimental techniques can have a great impact on the safe deployment and effective operation of a wide variety of morphing and inflatable structures such as morphing aircraft, solar sails, inflatable wings, and large antennas.

  3. The opearation and scientific data of MINERVA rover in Hayabusa mission

    NASA Astrophysics Data System (ADS)

    Yoshimitsu, T.; Kubota, T.; Nakatani, I.

    section Introduction The asteroid explorer Hayabusa operated by Institute of Space and Astronautical Science ISAS JAXA made a rendezvous with the target asteroid Itokawa in September 2005 after more than two years interplanetary cruise since the launch in 2003 The spacecraft precisely observed the target from the vicinity of the asteroid for two months and then tried to land on the surface in order to get some fragments which will be brought back to the Earth The authors installed a experimental small rover named MINERVA into the spacecraft It was supposed to make a surface exploration after having been deployed onto the surface MINERVA is the smallest spacecraft with a weight of 591 g and a dimension of about 10 cm in size In this small body it is equipped with a moving ability over the micro-gravity environment on the asteroid and a few scientific instruments cameras and thermometers to characterize the surface MINERVA was deployed in November 2005 but it could not reach at the asteroid because the deployment was not done at the good timing Thus it became a artificial solar satellite and the surface exploration was not conducted It survived at least for 18 hours after the deployment while the obtained data were transmitted to the Earth via the mother spacecraft This paper describes the operation and the possible science from the obtained data by MINERVA section Deployment MINERVA was deployed in November 12 2005 by sending a command from the Earth when the rehearsal operation of the touchdown was in

  4. The ATLAS EventIndex: architecture, design choices, deployment and first operation experience

    NASA Astrophysics Data System (ADS)

    Barberis, D.; Cárdenas Zárate, S. E.; Cranshaw, J.; Favareto, A.; Fernández Casaní, Á.; Gallas, E. J.; Glasman, C.; González de la Hoz, S.; Hřivnáč, J.; Malon, D.; Prokoshin, F.; Salt Cairols, J.; Sánchez, J.; Többicke, R.; Yuan, R.

    2015-12-01

    The EventIndex is the complete catalogue of all ATLAS events, keeping the references to all files that contain a given event in any processing stage. It replaces the TAG database, which had been in use during LHC Run 1. For each event it contains its identifiers, the trigger pattern and the GUIDs of the files containing it. Major use cases are event picking, feeding the Event Service used on some production sites, and technical checks of the completion and consistency of processing campaigns. The system design is highly modular so that its components (data collection system, storage system based on Hadoop, query web service and interfaces to other ATLAS systems) could be developed separately and in parallel during LSI. The EventIndex is in operation for the start of LHC Run 2. This paper describes the high-level system architecture, the technical design choices and the deployment process and issues. The performance of the data collection and storage systems, as well as the query services, are also reported.

  5. Use of Unmanned Aerial Systems to Study Atmospheric Processes During Sea Ice Freeze Up

    NASA Astrophysics Data System (ADS)

    de Boer, G.; Lawrence, D.; Weibel, D.; Borenstein, S.; Bendure, A.; Solomon, A.; Intrieri, J. M.

    2017-12-01

    In October 2016, a team of scientists deployed to Oliktok Point, Alaska to make atmospheric measurements as part of the Evaluation of Routine Atmospheric Sounding measurements using Unmanned Systems (ERASMUS) and Inaugural Campaigns for ARM Research using Unmanned Systems (ICARUS) campaigns. The deployment included operations using the University of Colorado DataHawk2 UAS. The DataHawk2 was configured to make measurements of atmospheric thermodynamics, wind and surface temperature, providing information on lower tropospheric thermodynamic structure, turbulent surface fluxes, and surface temperature. During this campaign, the team experienced a variety of weather regimes and witnessed the development of near shore sea ice. In this presentation, we will give an overview of the measurements obtained during this time and how they were used to better understand freeze up processes in this coastal environment. Additionally, we will provide insight into how these platforms are being used for evaluation of a fully-coupled sea ice forecast model operated by NOAA's Physical Sciences Division.

  6. Self-anchoring mast for deploying a high-speed submersible mixer in a tank

    DOEpatents

    Cato, Jr., Joseph E.; Shearer, Paul M [Aiken, SC; Rodwell, Philip O [Evans, GA

    2004-10-12

    A self-anchoring mast for deploying a high-speed submersible mixer in a tank includes operably connected first and second mast members (20, 22) and a foot member 46 operably connected to the second mast member for supporting the mast in a tank. The second mast member includes a track (36, 38) for slidably receiving a bearing of the mixer to change the orientation of the mixer in the tank.

  7. High Performance Computing Operations Review Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Cupps, Kimberly C.

    2013-12-19

    The High Performance Computing Operations Review (HPCOR) meeting—requested by the ASC and ASCR program headquarters at DOE—was held November 5 and 6, 2013, at the Marriott Hotel in San Francisco, CA. The purpose of the review was to discuss the processes and practices for HPC integration and its related software and facilities. Experiences and lessons learned from the most recent systems deployed were covered in order to benefit the deployment of new systems.

  8. Perceived demands during modern military operations.

    PubMed

    Boermans, Sylvie M; Kamphuis, Wim; Kamhuis, Wim; Delahaij, Roos; Korteling, J E Hans; Euwema, Martin C

    2013-07-01

    Using a cross-sectional design, this study explored operational demands during the International Security Assistance Force for Afghanistan (2009-2010) across distinct military units. A total of 1,413 Dutch soldiers, nested within four types of units (i.e., combat, combat support, service support, and command support units) filled out a 23-item self-survey in which they were asked to evaluate the extent to which they experienced operational characteristics as demanding. Exploratory factor analysis identified six underlying dimensions of demands. Multivariate analysis of variance revealed that distinct units are characterized by their own unique constellation of perceived demands, even after controlling for previous deployment experience. Most notable findings were found when comparing combat units to other types of units. These insights can be used to better prepare different types of military units for deployment, and support them in the specific demands they face during deployment. Reprint & Copyright © 2013 Association of Military Surgeons of the U.S.

  9. 78 FR 77550 - Integrated Corridor Management Deployment Planning Grants

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-23

    ... of this program is to promote the integrated management and operations of the transportation system... DEPARTMENT OF TRANSPORTATION Federal Highway Administration Integrated Corridor Management... the Integrated Corridor Management Deployment Planning Grants. The purpose of this notice was to...

  10. Satellite Power Systems (SPS): Concept development and evaluation program: Preliminary assessment

    NASA Technical Reports Server (NTRS)

    1979-01-01

    A preliminary assessment of a potential Satellite Power System (SPS) is provided. The assessment includes discussion of technical and economic feasibility; the effects of microwave power transmission beams on biological, ecological, and electromagnetic systems; the impact of SPS construction, deployment, and operations on the biosphere and on society; and the merits of SPS compared to other future energy alternatives.

  11. Investigating the Role of the HLTA in Supporting Learning in English Schools

    ERIC Educational Resources Information Center

    Graves, S.; Williams, K.

    2017-01-01

    The development of support staff was a key aspect of the Labour government's reform of the school workforce in England. As part of this strategy approximately 25,000 Teaching Assistants (TAs) gained Higher Level Teaching Assistant (HLTA) status and were deployed in schools in a variety of roles, often operating in a quasi-teaching role. The…

  12. Integrating Partner Nations into Coalition Operations

    DTIC Science & Technology

    2006-01-01

    of United Nations (UN) Security Council Resolu- tion 1529, Chile , Canada, France, and the United States established a multinational force...of restabi- lization. Chile continues to deploy forces as a member of the UN Stabilization Force Haiti (MINUSTAH), led by Brazil and comprised...supporting a tailored exercise and theater security cooperation program that has encouraged partners such as Chile , Brazil, and El Salvador to develop

  13. Integrated Environment for Development and Assurance

    DTIC Science & Technology

    2015-01-26

    Jan 26, 2015 © 2015 Carnegie Mellon University We Rely on Software for Safe Aircraft Operation Embedded software systems introduce a new class of...eveloper Compute Platform Runtime Architecture Application Software Embedded SW System Engineer Data Stream Characteristics Latency jitter affects...Why do system level failures still occur despite fault tolerance techniques being deployed in systems ? Embedded software system as major source of

  14. Defense Science Board Task Force Report on Next-Generation Unmanned Undersea Systems

    DTIC Science & Technology

    2016-10-01

    active learning occurs in an environment that extends beyondchoreographed demonstrations designed to validate pre -determined hypotheses. Finally, when...4 OPNAV N99 should coordinate a broad-based design , development, and experimental effort to bypass traditional limitations for unmanned undersea...approaches that could facilitate rapid experimentation , operational demonstration of capabilities, and deployment of initial capabilities that show

  15. PILOT-SCALE TEST RESULTS OF A THIN FILM EVAPORATOR SYSTEM FOR MANAGEMENT OF LIQUID HIGH-LEVEL WASTES AT THE HANFORD SITE WASHINGTON USA -11364

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    CORBETT JE; TEDESCH AR; WILSON RA

    2011-02-14

    A modular, transportable evaporator system, using thin film evaporative technology, is planned for deployment at the Hanford radioactive waste storage tank complex. This technology, herein referred to as a wiped film evaporator (WFE), will be located at grade level above an underground storage tank to receive pumped liquids, concentrate the liquid stream from 1.1 specific gravity to approximately 1.4 and then return the concentrated solution back into the tank. Water is removed by evaporation at an internal heated drum surface exposed to high vacuum. The condensed water stream will be shipped to the site effluent treatment facility for final disposal.more » This operation provides significant risk mitigation to failure of the aging 242-A Evaporator facility; the only operating evaporative system at Hanford maximizing waste storage. This technology is being implemented through a development and deployment project by the tank farm operating contractor, Washington River Protection Solutions (WRPS), for the Office of River Protection/Department of Energy (ORPIDOE), through Columbia Energy and Environmental Services, Inc. (Columbia Energy). The project will finalize technology maturity and install a system at one of the double-shell tank farms. This paper summarizes results of a pilot-scale test program conducted during calendar year 2010 as part of the ongoing technology maturation development scope for the WFE.« less

  16. Intelligent Operation and Maintenance of Micro-grid Technology and System Development

    NASA Astrophysics Data System (ADS)

    Fu, Ming; Song, Jinyan; Zhao, Jingtao; Du, Jian

    2018-01-01

    In order to achieve the micro-grid operation and management, Studying the micro-grid operation and maintenance knowledge base. Based on the advanced Petri net theory, the fault diagnosis model of micro-grid is established, and the intelligent diagnosis and analysis method of micro-grid fault is put forward. Based on the technology, the functional system and architecture of the intelligent operation and maintenance system of micro-grid are studied, and the microcomputer fault diagnosis function is introduced in detail. Finally, the system is deployed based on the micro-grid of a park, and the micro-grid fault diagnosis and analysis is carried out based on the micro-grid operation. The system operation and maintenance function interface is displayed, which verifies the correctness and reliability of the system.

  17. Teleradiology network to improve patient care in a peacekeeping military operation

    NASA Astrophysics Data System (ADS)

    Cleary, Kevin R.; Levine, Betty A.; Norton, Gary S.; Mun, Seong K.; Cramer, Timothy J.; de Treville, Robert E.

    1997-05-01

    The Imaging Science and Information Systems (ISIS) Center of the Department of Radiology at Georgetown University Medical Center recently collaborated with the US Army in developing an off-the-shelf teleradiology network for Operation Joint Endeavor, the peace-keeping mission in Bosnia-Herzegovina. The network is part of Operation Primetime III, a project to deploy advanced communications and medical equipment to provide state-of-the-art medical care to the 20,000 US troops stationed there. The network encompasses three major sites: the 212th Mobile Army Surgical Hospital (MASH) near Tuzla, Bosnia-Herzegovina; the 67th Combat Support Hospital (CSH) in Taszar, Hungary; and the Landstuhl Regional Medical Center (LRMC) in Landstuhl, Germany. Planning for the project began in January 1996, and all three sites were operational by April 1996. Since the system was deployed, computed radiography (CR) has been sued almost exclusively at the MASH and CSH for all general x-ray exams. From mid- May to September 1996, over 2700 CR images were acquired at the MASH and over 1600 at the CSH. Since there was not a radiologist a the MASH, the images were transferred to the CSH for primary diagnosis and archiving. In the same time period, over 550 patient folders were sent from the MASH to the CSH.

  18. An intelligent surveillance platform for large metropolitan areas with dense sensor deployment.

    PubMed

    Fernández, Jorge; Calavia, Lorena; Baladrón, Carlos; Aguiar, Javier M; Carro, Belén; Sánchez-Esguevillas, Antonio; Alonso-López, Jesus A; Smilansky, Zeev

    2013-06-07

    This paper presents an intelligent surveillance platform based on the usage of large numbers of inexpensive sensors designed and developed inside the European Eureka Celtic project HuSIMS. With the aim of maximizing the number of deployable units while keeping monetary and resource/bandwidth costs at a minimum, the surveillance platform is based on the usage of inexpensive visual sensors which apply efficient motion detection and tracking algorithms to transform the video signal in a set of motion parameters. In order to automate the analysis of the myriad of data streams generated by the visual sensors, the platform's control center includes an alarm detection engine which comprises three components applying three different Artificial Intelligence strategies in parallel. These strategies are generic, domain-independent approaches which are able to operate in several domains (traffic surveillance, vandalism prevention, perimeter security, etc.). The architecture is completed with a versatile communication network which facilitates data collection from the visual sensors and alarm and video stream distribution towards the emergency teams. The resulting surveillance system is extremely suitable for its deployment in metropolitan areas, smart cities, and large facilities, mainly because cheap visual sensors and autonomous alarm detection facilitate dense sensor network deployments for wide and detailed coverage.

  19. Psychiatric diagnoses and treatment of U.S. military personnel while deployed to Iraq.

    PubMed

    Schmitz, Kimberly J; Schmied, Emily A; Webb-Murphy, Jennifer A; Hammer, Paul S; Larson, Gerald E; Conway, Terry L; Galarneau, Michael R; Boucher, Wayne C; Edwards, Nathan K; Johnson, Douglas C

    2012-04-01

    Military personnel deployed in support of combat operations are at significantly higher risk for mental health problems. However, much of what we know about combat-related mental health comes from postdeployment assessments. This study describes the mental health of 1,336 treatment-seeking deployed U.S. military personnel and interventions recommended by military mental health providers in Iraq from January 2006 to January 2007. Cases were primarily young enlisted men, most of whom were on their first combat deployment. Marines made up the majority of the cases (60%), but there were also large numbers of Army and Navy personnel. The most common psychiatric diagnoses were anxiety disorders (31%, including 11% with posttraumatic stress disorder), followed by adjustment (27%) and mood disorders (25%, including 22% with depression). Medication was the most commonly prescribed treatment for patients with psychiatric diagnoses but was often combined with recommendations for psychotherapy/counseling and/or behavioral modifications. The findings illustrate the distribution of mental health conditions seen among treatment-seeking troops while actively serving in a combat environment and the interventions recommended for them. Further examination of postdeployment health outcomes may help to facilitate the development of more effective acute intervention strategies in theater.

  20. Wireless Sensor Network Deployment for Monitoring Wildlife Passages

    PubMed Central

    Garcia-Sanchez, Antonio-Javier; Garcia-Sanchez, Felipe; Losilla, Fernando; Kulakowski, Pawel; Garcia-Haro, Joan; Rodríguez, Alejandro; López-Bao, José-Vicente; Palomares, Francisco

    2010-01-01

    Wireless Sensor Networks (WSNs) are being deployed in very diverse application scenarios, including rural and forest environments. In these particular contexts, specimen protection and conservation is a challenge, especially in natural reserves, dangerous locations or hot spots of these reserves (i.e., roads, railways, and other civil infrastructures). This paper proposes and studies a WSN based system for generic target (animal) tracking in the surrounding area of wildlife passages built to establish safe ways for animals to cross transportation infrastructures. In addition, it allows target identification through the use of video sensors connected to strategically deployed nodes. This deployment is designed on the basis of the IEEE 802.15.4 standard, but it increases the lifetime of the nodes through an appropriate scheduling. The system has been evaluated for the particular scenario of wildlife monitoring in passages across roads. For this purpose, different schemes have been simulated in order to find the most appropriate network operational parameters. Moreover, a novel prototype, provided with motion detector sensors, has also been developed and its design feasibility demonstrated. Original software modules providing new functionalities have been implemented and included in this prototype. Finally, main performance evaluation results of the whole system are presented and discussed in depth. PMID:22163601

  1. GEWEX - The Global Energy and Water Cycle Experiment

    NASA Technical Reports Server (NTRS)

    Chahine, Moustafa T.

    1992-01-01

    GEWEX, which is part of the World Climate Research Program, has as its goal an order-of-magnitude improvement in the ability to model global precipitation and evaporation and furnish an accurate assessment of the sensitivity of atmospheric radiation and clouds. Attention will also be given to the response of the hydrological cycle and water resources to climate change. GEWEX employs a single program to coordinate all aspects of climatology from model development to the deployment and operation of observational systems. GEWEX will operate over the next two decades.

  2. Wernher von Braun

    NASA Image and Video Library

    1965-05-25

    This image depicts the tension in the Launch Control Center of the Launch Complex 37 at Cape Canaveral, Florida, during the SA-8 on May 25, 1965. Pointing, center is Dr. Kurt Debus, Director, Launch Operations Directorate, MSFC. To the right is Dr. Hans Gruene, Deputy Director, Launch Operations Directorate, MSFC; Dr. von Braun, Director, Marshall Space Flight Center (MSFC); and leaning, Dr. Eberhard Rees, Director, Deputy Director for Research and Development, MSFC. The SA-8 mission, with a Saturn I launch vehicle, made the first night launch and deployed Pegasus II, micrometeoroid detection satellite.

  3. Continuous Strategy Development for Effects-Based Operations

    DTIC Science & Technology

    2006-02-01

    the probability of COA success. The time slider from the “Time Selector” choice in the View menu may also be used to animate the probability coloring...will Deploy WMD, since this can be assumed to have the inverse probability (1-P) of our objective. Clausewitz theory teaches us that an enemy must be... using XSLT, a concise language for transforming XML documents, for forward and reverse conversion between the SDT and SMS plan formats. 2. Develop a

  4. Photovoltaic power systems for rural areas of developing countries

    NASA Technical Reports Server (NTRS)

    Rosenblum, L.; Bifano, W. J.; Hein, G. F.; Ratajczak, A. F.

    1979-01-01

    Systems technology, reliability, and present and projected costs of photovoltaic systems are discussed using data derived from NASA, Lewis Research Center experience with photovoltaic systems deployed with a variety of users. Operating systems in two villages, one in Upper Volta and the other in southwestern Arizona are described. Energy cost comparisons are presented for photovoltaic systems versus alternative energy sources. Based on present system technology, reliability, and costs, photovoltaics provides a realistic energy option for developing nations.

  5. Mental health problems, use of mental health services, and attrition from military service after returning from deployment to Iraq or Afghanistan.

    PubMed

    Hoge, Charles W; Auchterlonie, Jennifer L; Milliken, Charles S

    2006-03-01

    The US military has conducted population-level screening for mental health problems among all service members returning from deployment to Afghanistan, Iraq, and other locations. To date, no systematic analysis of this program has been conducted, and studies have not assessed the impact of these deployments on mental health care utilization after deployment. To determine the relationship between combat deployment and mental health care use during the first year after return and to assess the lessons learned from the postdeployment mental health screening effort, particularly the correlation between the screening results, actual use of mental health services, and attrition from military service. Population-based descriptive study of all Army soldiers and Marines who completed the routine postdeployment health assessment between May 1, 2003, and April 30, 2004, on return from deployment to Operation Enduring Freedom in Afghanistan (n = 16,318), Operation Iraqi Freedom (n = 222,620), and other locations (n = 64,967). Health care utilization and occupational outcomes were measured for 1 year after deployment or until leaving the service if this occurred sooner. Screening positive for posttraumatic stress disorder, major depression, or other mental health problems; referral for a mental health reason; use of mental health care services after returning from deployment; and attrition from military service. The prevalence of reporting a mental health problem was 19.1% among service members returning from Iraq compared with 11.3% after returning from Afghanistan and 8.5% after returning from other locations (P<.001). Mental health problems reported on the postdeployment assessment were significantly associated with combat experiences, mental health care referral and utilization, and attrition from military service. Thirty-five percent of Iraq war veterans accessed mental health services in the year after returning home; 12% per year were diagnosed with a mental health problem. More than 50% of those referred for a mental health reason were documented to receive follow-up care although less than 10% of all service members who received mental health treatment were referred through the screening program. Combat duty in Iraq was associated with high utilization of mental health services and attrition from military service after deployment. The deployment mental health screening program provided another indicator of the mental health impact of deployment on a population level but had limited utility in predicting the level of mental health services that were needed after deployment. The high rate of using mental health services among Operation Iraqi Freedom veterans after deployment highlights challenges in ensuring that there are adequate resources to meet the mental health needs of returning veterans.

  6. Proposed Use of the NASA Ames Nebula Cloud Computing Platform for Numerical Weather Prediction and the Distribution of High Resolution Satellite Imagery

    NASA Technical Reports Server (NTRS)

    Limaye, Ashutosh S.; Molthan, Andrew L.; Srikishen, Jayanthi

    2010-01-01

    The development of the Nebula Cloud Computing Platform at NASA Ames Research Center provides an open-source solution for the deployment of scalable computing and storage capabilities relevant to the execution of real-time weather forecasts and the distribution of high resolution satellite data to the operational weather community. Two projects at Marshall Space Flight Center may benefit from use of the Nebula system. The NASA Short-term Prediction Research and Transition (SPoRT) Center facilitates the use of unique NASA satellite data and research capabilities in the operational weather community by providing datasets relevant to numerical weather prediction, and satellite data sets useful in weather analysis. SERVIR provides satellite data products for decision support, emphasizing environmental threats such as wildfires, floods, landslides, and other hazards, with interests in numerical weather prediction in support of disaster response. The Weather Research and Forecast (WRF) model Environmental Modeling System (WRF-EMS) has been configured for Nebula cloud computing use via the creation of a disk image and deployment of repeated instances. Given the available infrastructure within Nebula and the "infrastructure as a service" concept, the system appears well-suited for the rapid deployment of additional forecast models over different domains, in response to real-time research applications or disaster response. Future investigations into Nebula capabilities will focus on the development of a web mapping server and load balancing configuration to support the distribution of high resolution satellite data sets to users within the National Weather Service and international partners of SERVIR.

  7. Development of miniaturized instrumentation for Planetary Exploration and its application to the Mars MetNet Precursor Mission

    NASA Astrophysics Data System (ADS)

    Guerrero, Hector

    2010-05-01

    In this communication is presented the current development of some miniaturized instruments developed for Lander and Rovers for Planetary exploration. In particular, we present a magnetometer with resolution below 10 nT and mass in the range of 45 g; a sun irradiance spectral sensor with 10 bands (UV-VIS-near IR) and a mass in the range of 75 g. These are being developed for the Finnish, Russian and Spanish MetNet Mars Precursor Mission, to be launched in 2011 within the Phobos Grunt (Sample Return). The magnetometer (at present at EQM level) has two triaxial magnetometers (based on commercial AMR technologies) that operate in gradiometer configuration. Moreover has inside the box there a triaxial accelerometer to get the gravitational orientation of the magnetometer after its deployment. This unit is being designed to operate under the Mars severe conditions (at night) without any thermal conditioning. The sun irradiance spectral irradiance sensor is composed by individual silicon photodiodes with interference filters on each, and collimators to prevent wavelength shifts due to oblique incidence. In order allow discrimination between direct and diffuse ambient light, the photodiodes are deployed on the top and lateral sides of this unit. The instrument is being optimized for deep UV detection, dust optical depth and Phobos transits. The accuracy for detecting some atmospheric gases traces is under study. Besides, INTA is developing optical wireless link technologies modules for operating on Mars at distances over 1 m, to minimize harness, reduce weight and improve Assembly Integration and Test (AIT) tasks. Actual emitter/receiver modules are below 10 g allowing data transmission rates over 1 Mbps.

  8. Flexible robotic entry device for a nuclear materials production reactor

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Heckendorn, F.M. II

    1988-01-01

    The Savannah River Laboratory has developed and is implementing a flexible robotic entry device (FRED) for the nuclear materials production reactors now operating at the Savannah River Plant (SRP). FRED is designed for rapid deployment into confinement areas of operating reactors to assess unknown conditions. A unique smart tether method has been incorporated into FRED for simultaneous bidirectional transmission of multiple video/audio/control/power signals over a single coaxial cable. This system makes it possible to use FRED under all operating and standby conditions, including those where radio/microwave transmissions are not possible or permitted, and increases the quantity of data available.

  9. Explosive Detection in Aviation Applications Using CT

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Martz, H E; Crawford, C R

    2011-02-15

    CT scanners are deployed world-wide to detect explosives in checked and carry-on baggage. Though very similar to single- and dual-energy multi-slice CT scanners used today in medical imaging, some recently developed explosives detection scanners employ multiple sources and detector arrays to eliminate mechanical rotation of a gantry, photon counting detectors for spectral imaging, and limited number of views to reduce cost. For each bag scanned, the resulting reconstructed images are first processed by automated threat recognition algorithms to screen for explosives and other threats. Human operators review the images only when these automated algorithms report the presence of possible threats.more » The US Department of Homeland Security (DHS) has requirements for future scanners that include dealing with a larger number of threats, higher probability of detection, lower false alarm rates and lower operating costs. One tactic that DHS is pursuing to achieve these requirements is to augment the capabilities of the established security vendors with third-party algorithm developers. A third-party in this context refers to academics and companies other than the established vendors. DHS is particularly interested in exploring the model that has been used very successfully by the medical imaging industry, in which university researchers develop algorithms that are eventually deployed in commercial medical imaging equipment. The purpose of this paper is to discuss opportunities for third-parties to develop advanced reconstruction and threat detection algorithms.« less

  10. The LCOGT Observation Portal, Data Pipeline and Science Archive

    NASA Astrophysics Data System (ADS)

    Lister, Tim; LCOGT Science Archive Team

    2014-01-01

    Las Cumbres Observatory Global Telescope (LCOGT) is building and deploying a world-wide network of optical telescopes dedicated to time-domain astronomy. During 2012-2013, we successfully deployed and commissioned nine new 1m telescopes at McDonald Observatory (Texas), CTIO (Chile), SAAO (South Africa) and Siding Spring Observatory (Australia). New, improved cameras and additional telescopes will be deployed during 2014. To enable the diverse LCOGT user community of scientific and educational users to request observations on the LCOGT Network and to see their progress and get access to their data, we have developed an Observation Portal system. This Observation Portal integrates proposal submission and observation requests with seamless access to the data products from the data pipelines in near-realtime and long-term products from the Science Archive. We describe the LCOGT Observation Portal and the data pipeline, currently in operation, which makes use of the ORAC-DR automated recipe-based data reduction pipeline and illustrate some of the new data products. We also present the LCOGT Science Archive, which is being developed in partnership with the Infrared Processing and Analysis Center (IPAC) and show some of the new features the Science Archive provides.

  11. Surface Control of Cold Hibernated Elastic Memory Self-Deployable Structure

    NASA Technical Reports Server (NTRS)

    Sokolowski, Witold M.; Ghaffarian, Reza

    2006-01-01

    A new class of simple, reliable, lightweight, low packaging volume and cost, self-deployable structures has been developed for use in space and commercial applications. This technology called 'cold hibernated elastic memory' (CHEM) utilizes shape memory polymers (SMP)in open cellular (foam) structure or sandwich structures made of shape memory polymer foam cores and polymeric composite skins. Some of many potential CHEM space applications require a high precision deployment and surface accuracy during operation. However, a CHEM structure could be slightly distorted by the thermo-mechanical processing as well as by thermal space environment Therefore, the sensor system is desirable to monitor and correct the potential surface imperfection. During these studies, the surface control of CHEM smart structures was demonstrated using a Macro-Fiber Composite (MFC) actuator developed by the NASA LaRC and US Army ARL. The test results indicate that the MFC actuator performed well before and after processing cycles. It reduced some residue compressive strain that in turn corrected very small shape distortion after each processing cycle. The integrated precision strain gages were detecting only a small flat shape imperfection indicating a good recoverability of original shape of the CHEM test structure.

  12. Energy scavenging for long-term deployable wireless sensor networks.

    PubMed

    Mathúna, Cian O; O'Donnell, Terence; Martinez-Catala, Rafael V; Rohan, James; O'Flynn, Brendan

    2008-05-15

    The coming decade will see the rapid emergence of low cost, intelligent, wireless sensors and their widespread deployment throughout our environment. While wearable systems will operate over communications ranges of less than a meter, building management systems will operate with inter-node communications ranges of the order of meters to tens of meters and remote environmental monitoring systems will require communications systems and associated energy systems that will allow reliable operation over kilometers. Autonomous power should allow wireless sensor nodes to operate in a "deploy and forget" mode. The use of rechargeable battery technology is problematic due to battery lifetime issues related to node power budget, battery self-discharge, number of recharge cycles and long-term environmental impact. Duty cycling of wireless sensor nodes with long "SLEEP" times minimises energy usage. A case study of a multi-sensor, wireless, building management system operating using the Zigbee protocol demonstrates that, even with a 1 min cycle time for an 864 ms "ACTIVE" mode, the sensor module is already in SLEEP mode for almost 99% of the time. For a 20-min cycle time, the energy utilisation in SLEEP mode exceeds the ACTIVE mode energy by almost a factor of three and thus dominates the module energy utilisation thereby providing the ultimate limit to the power system lifetime. Energy harvesting techniques can deliver energy densities of 7.5 mW/cm(2) from outdoor solar, 100 microW/cm(2) from indoor lighting, 100 microW/cm(3) from vibrational energy and 60 microW/cm(2) from thermal energy typically found in a building environment. A truly autonomous, "deploy and forget" battery-less system can be achieved by scaling the energy harvesting system to provide all the system energy needs. In the building management case study discussed, for duty cycles of less than 0.07% (i.e. in ACTIVE mode for 0.864 s every 20 min), energy harvester device dimensions of approximately 2 cm on a side would be sufficient to supply the complete wireless sensor node energy. Key research challenges to be addressed to deliver future, remote, wireless, chemo-biosensing systems include the development of low cost, low-power sensors, miniaturised fluidic transport systems, anti-bio-fouling sensor surfaces, sensor calibration, reliable and robust system packaging, as well as associated energy delivery systems and energy budget management.

  13. Towards the Ubiquitous Deployment of DNSSEC

    DTIC Science & Technology

    2016-01-01

    with other deployment partners around the world, there is now a significant and growing number of TLDs that have been signed, and a number of...as Google Earth, the Blackberry 10 operating system, and the entire set of K Desktop Environment (KDE) windowing system applications are based on...differentiate between transient errors and legitimate DNS spoofing attacks is likely going to be very important as deployment grows . The importance of

  14. Update on Progress of Space Station Integrated Kinetic Launcher for Orbital Payload Systems (SSIKLOPS) - Cyclops

    NASA Technical Reports Server (NTRS)

    Newswander, Daniel; Smith, James P.; Lamb, Craig R.; Ballard, Perry G.

    2014-01-01

    The Space Station Integrated Kinetic Launcher for Orbital Payload Systems (SSIKLOPS), known as "Cyclops" to the International Space Station (ISS) community, was introduced last August (2013) during Technical Session V: From Earth to Orbit of the 27th Annual AIAA/USU Conference on Small Satellites. Cyclops is a collaboration between the NASA ISS Program, NASA Johnson Space Center Engineering, and Department of Defense (DoD) Space Test Program (STP) communities to develop a dedicated 50-100 kg class ISS small satellite deployment system. This paper will address the progress of Cyclops through its fabrication, assembly, flight certification, and on-orbit demonstration phases. It will also go into more detail regarding its anatomy, its satellite deployment concept of operations, and its satellite interfaces and requirements. Cyclops is manifested to fly on Space-X 4 which is currently scheduled in July 2014 with its initial satellite deployment demonstration of DoD STP's SpinSat and UT/TAMU's Lonestar satellites being late summer or fall of 2014.

  15. An engineering array for the High Altitude Water Cherenkov (HAWC) Gamma-Ray Observatory

    NASA Astrophysics Data System (ADS)

    Longo, Megan; Mostafa, Miguel

    2012-03-01

    The High Altitude Water Cherenkov (HAWC) gamma-ray observatory is currently being deployed at 4100 m in Sierra Negra, Mexico. The HAWC observatory will have 300 Water Cherenkov Detectors (WCDs). Each WCD will be instrumented with 4 upward facing baffled photo multiplier tubes (PMTs) anchored to the bottom of a 5 m deep by 7.3 m diameter steel container with a multilayer hermetic plastic bag containing 200,000 liters of purified water. An engineering array of 6 WCDs was deployed in Summer 2011 at the HAWC site and has been operational since then. This array serves to validate the design and construction methods for the HAWC observatory. It has also been collecting data which allows for the development of data collection and analysis tools. Here we will describe the deployment of the engineering array, the lessons learned from this experience and the implications for HAWC, as well as give an introduction into data collection and initial analysis being done, which will be presented jointly.

  16. The Role 3 Multinational Medical Unit at Kandahar Airfield 2005–2010

    PubMed Central

    Brisebois, Ronald; Hennecke, Peter; Kao, Raymond; McAlister, Vivian; Po, Joseph; Stiegelmar, Rob; Tien, Homer

    2011-01-01

    In late 2005, Canadian Forces Health Services (CFHS) was tasked with the command of the NATO Role 3 Multinational Medical Unit (R3MMU) on Kandahar Airfield in southern Afghanistan. Preparations drew on past experience and planning. Eight complete hospital contingents were trained and deployed in rotation. Near-reality simulation training was undertaken with the combat brigade, including complete deployment of the field hospital in the exercise area. Standard operating procedures (SOP) were developed and applied by each rotation so successfully that they were adopted by the new command in late 2009. The Canadian period at R3MMU had the highest survival rate ever recorded for victims of war. Lessons learned are being applied among victims of the conflict and trauma. The experience of the R3MMU was used to successfully deploy a hospital as part of the earthquake relief effort in Haiti in 2010. The training protocols and SOP are being applied to disaster preparedness in Canadian civilian hospitals. PMID:22099325

  17. The Role 3 Multinational Medical Unit at Kandahar Airfield 2005-2010.

    PubMed

    Brisebois, Ronald; Hennecke, Peter; Kao, Raymond; McAlister, Vivian; Po, Joseph; Stiegelmar, Rob; Tien, Homer

    2011-12-01

    In late 2005, Canadian Forces Health Services (CFHS) was tasked with the command of the NATO Role 3 Multinational Medical Unit (R3MMU) on Kandahar Airfield in southern Afghanistan. Preparations drew on past experience and planning. Eight complete hospital contingents were trained and deployed in rotation. Near-reality simulation training was undertaken with the combat brigade, including complete deployment of the field hospital in the exercise area. Standard operating procedures (SOP) were developed and applied by each rotation so successfully that they were adopted by the new command in late 2009. The Canadian period at R3MMU had the highest survival rate ever recorded for victims of war. Lessons learned are being applied among victims of the conflict and trauma. The experience of the R3MMU was used to successfully deploy a hospital as part of the earthquake relief effort in Haiti in 2010.The training protocols and SOP are being applied to disaster preparedness in Canadian civilian hospitals.

  18. New Sensor Technologies for Ocean Exploration and Observation

    NASA Astrophysics Data System (ADS)

    Manley, J. E.

    2005-12-01

    NOAA's Office of Ocean Exploration (OE) is an active supporter of new ocean technologies. Sensors, in particular, have been a focus of recent investments as have platforms that can support both dedicated voyages of discovery and Integrated Ocean Observing Systems (IOOS). Recent programs sponsored by OE have developed technical solutions that will be of use in sensor networks and in stand-alone ocean research programs. Particular projects include: 1) the Joint Environmental Science Initiative (JESI) a deployment of a highly flexible marine sensing system, in collaboration with NASA, that demonstrated a new paradigm for marine ecosystem monitoring. 2) the development and testing of an in situ marine mass spectrometer, via grant to the Woods Hole Oceanographic Institution (WHOI). This instrument has been designed to function at depths up to 5000 meters. 3) the evolution of glider AUVs for aerial deployment, through a grant to Webb Research Corporation. This program's goal is air certification for gliders, which will allow them to be operationally deployed from NAVOCEANO aircraft. 4) the development of new behaviors for the Autonomous Benthic Explorer (ABE) allowing it to anchor in place and await instructions, through a grant to WHOI. This will support the operational use of AUVs in observing system networks. 5) development of new sensors for AUVs through a National Ocean Partnership Program (NOPP) award to Rutgers Universty. This project will develop a Fluorescence Induction Relaxation (FIRe) System to measure biomass and integrate the instrument into an AUV glider. 6) an SBIR award for the development of anti-fouling technologies for solar panels and in situ sensors. This effort at Nanohmics Inc. is developing natural product antifoulants (NPA) in optical quality hard polymers. The technology and results of each of these projects are one component of OE's overall approach to technology research and development. OE's technology program represents the leading edge of NOAA investment in ocean sensors and tools that eventually will find application in mission areas such as IOOS. This "big picture" provides context for focused information on detailed results of OE investments. As NOAA increases its investments in IOOS, and related technologies, these projects are timely and should be beneficial to the entire environmental sensor network community.

  19. Global Precipitation Measurement (GPM) and International Space Station (ISS) Coordination for CubeSat Deployments to Minimize Collision Risk

    NASA Technical Reports Server (NTRS)

    Pawloski, James H.; Aviles, Jorge; Myers, Ralph; Parris, Joshua; Corley, Bryan; Hehn, Garrett; Pascucci, Joseph

    2016-01-01

    The Global Precipitation Measurement Mission (GPM) is a joint U.S. and Japan mission to observe global precipitation, extending the Tropical Rainfall Measuring Mission (TRMM), which was launched by H-IIA from Tanegashima in Japan on February 28TH, 2014 directly into its 407km operational orbit. The International Space Station (ISS) is an international human research facility operated jointly by Russia and the USA from NASA's Johnson Space Center (JSC) in Houston Texas. Mission priorities lowered the operating altitude of ISS from 415km to 400km in early 2105, effectively placing both vehicles into the same orbital regime. The ISS has begun a program of deployments of cost effective CubeSats from the ISS that allow testing and validation of new technologies. With a major new asset flying at the same effective altitude as the ISS, CubeSat deployments became a serious threat to GPM and therefore a significant indirect threat to the ISS. This paper describes the specific problem of collision threat to GPM and risk to ISS CubeSat deployment and the process that was implemented to keep both missions safe from collision and maximize their project goals.

  20. Forecasting Significant Societal Events Using The Embers Streaming Predictive Analytics System

    PubMed Central

    Katz, Graham; Summers, Kristen; Ackermann, Chris; Zavorin, Ilya; Lim, Zunsik; Muthiah, Sathappan; Butler, Patrick; Self, Nathan; Zhao, Liang; Lu, Chang-Tien; Khandpur, Rupinder Paul; Fayed, Youssef; Ramakrishnan, Naren

    2014-01-01

    Abstract Developed under the Intelligence Advanced Research Project Activity Open Source Indicators program, Early Model Based Event Recognition using Surrogates (EMBERS) is a large-scale big data analytics system for forecasting significant societal events, such as civil unrest events on the basis of continuous, automated analysis of large volumes of publicly available data. It has been operational since November 2012 and delivers approximately 50 predictions each day for countries of Latin America. EMBERS is built on a streaming, scalable, loosely coupled, shared-nothing architecture using ZeroMQ as its messaging backbone and JSON as its wire data format. It is deployed on Amazon Web Services using an entirely automated deployment process. We describe the architecture of the system, some of the design tradeoffs encountered during development, and specifics of the machine learning models underlying EMBERS. We also present a detailed prospective evaluation of EMBERS in forecasting significant societal events in the past 2 years. PMID:25553271

Top