Results from Testing of Two Rotary Percussive Drilling Systems
NASA Technical Reports Server (NTRS)
Kriechbaum, Kristopher; Brown, Kyle; Cady, Ian; von der Heydt, Max; Klein, Kerry; Kulczycki, Eric; Okon, Avi
2010-01-01
The developmental test program for the MSL (Mars Science Laboratory) rotary percussive drill examined the e ect of various drill input parameters on the drill pene- tration rate. Some of the input parameters tested were drill angle with respect to gravity and percussive impact energy. The suite of rocks tested ranged from a high strength basalt to soft Kaolinite clay. We developed a hole start routine to reduce high sideloads from bit walk. The ongoing development test program for the IMSAH (Integrated Mars Sample Acquisition and Handling) rotary percussive corer uses many of the same rocks as the MSL suite. An additional performance parameter is core integrity. The MSL development test drill and the IMSAH test drill use similar hardware to provide rotation and percussion. However, the MSL test drill uses external stabilizers, while the IMSAH test drill does not have external stabilization. In addition the IMSAH drill is a core drill, while the MSL drill uses a solid powdering bit. Results from the testing of these two related drilling systems is examined.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Alan Black; Arnis Judzis
2004-10-01
The industry cost shared program aims to benchmark drilling rates of penetration in selected simulated deep formations and to significantly improve ROP through a team development of aggressive diamond product drill bit--fluid system technologies. Overall the objectives are as follows: Phase 1--Benchmark ''best in class'' diamond and other product drilling bits and fluids and develop concepts for a next level of deep drilling performance; Phase 2--Develop advanced smart bit-fluid prototypes and test at large scale; and Phase 3--Field trial smart bit-fluid concepts, modify as necessary and commercialize products. As of report date, TerraTek has concluded all major preparations for themore » high pressure drilling campaign. Baker Hughes encountered difficulties in providing additional pumping capacity before TerraTek's scheduled relocation to another facility, thus the program was delayed further to accommodate the full testing program.« less
Wood Programs. Courseware Evaluation for Vocational and Technical Education.
ERIC Educational Resources Information Center
Kaylor, Robert; And Others
This courseware evaluation rates the Wood Programs software developed by the Iowa Department of Public Instruction. (These programs--not contained in this document--include understanding board feet, wood characteristics, wood safety drill, wood dimensions, wood moisture, operating the table saw, radial arm, measurement drill, fraction drill, and…
DOE Office of Scientific and Technical Information (OSTI.GOV)
TerraTek
2007-06-30
A deep drilling research program titled 'An Industry/DOE Program to Develop and Benchmark Advanced Diamond Product Drill Bits and HP/HT Drilling Fluids to Significantly Improve Rates of Penetration' was conducted at TerraTek's Drilling and Completions Laboratory. Drilling tests were run to simulate deep drilling by using high bore pressures and high confining and overburden stresses. The purpose of this testing was to gain insight into practices that would improve rates of penetration and mechanical specific energy while drilling under high pressure conditions. Thirty-seven test series were run utilizing a variety of drilling parameters which allowed analysis of the performance ofmore » drill bits and drilling fluids. Five different drill bit types or styles were tested: four-bladed polycrystalline diamond compact (PDC), 7-bladed PDC in regular and long profile, roller-cone, and impregnated. There were three different rock types used to simulate deep formations: Mancos shale, Carthage marble, and Crab Orchard sandstone. The testing also analyzed various drilling fluids and the extent to which they improved drilling. The PDC drill bits provided the best performance overall. The impregnated and tungsten carbide insert roller-cone drill bits performed poorly under the conditions chosen. The cesium formate drilling fluid outperformed all other drilling muds when drilling in the Carthage marble and Mancos shale with PDC drill bits. The oil base drilling fluid with manganese tetroxide weighting material provided the best performance when drilling the Crab Orchard sandstone.« less
Summary of moderate depth lunar drill development program from its conception to 1 July 1972
NASA Technical Reports Server (NTRS)
1972-01-01
The results are summarized of a program aimed at the development of a lunar drill capable of taking lunar surface cores to depths of at least 100 feet. The technologies employed in the program are described along with the accomplishments and problems encountered. Recommendations are included for future concept improvements and developments.
Geothermal well drilling manual at Cerro Prieto
DOE Office of Scientific and Technical Information (OSTI.GOV)
Fernandez P., A.; Flores S., M.
The objective of the drilling manual is to solve all problems directly related to drilling during the construction of a well. In this case, the topics dealt which are drilling fluids and hydraulics to be applied in the field to improve drilling progress, eliminate risks and achieve good well-completion. There are other topics that are applicable such as drill bits and the drilling string, which are closely linked to drilling progress. On this occasion drilling fluid and hydraulics programs are presented, in addition to a computing program for a Casio FX-502P calculator to be applied in the field to optimizemore » hydraulics and in the analysis of hydraulics for development and exploration wells at their different intervals.« less
The Role of Well Control Training in Developing Safe Onshore and Offshore Oil Drilling Operations
ERIC Educational Resources Information Center
Abulhassn, Aber
2016-01-01
This research investigates the role of the International Well Control Forum (IWCF) Rotary Drilling Well Control Training Program in developing safe oil drilling operations from the perspective of onshore and offshore drilling crews. The research methodology is a qualitative case study. A total of 40 IWCF candidates were interviewed, with 10 from…
ERIC Educational Resources Information Center
Turner, Gordon; And Others
This courseware evaluation rates a set of 25 industrial education general software programs developed by the Iowa Department of Public Instruction. (These programs--not contained in this document--include measurement drill, fraction drill, loan and interest cost analysis, assault vehicle speeds, sun's rays, Ohm's law, concrete calculations, roof…
Towards a distributed infrastructure for research drilling in Europe
NASA Astrophysics Data System (ADS)
Mevel, C.; Gatliff, R.; Ludden, J.; Camoin, G.; Horsfield, B.; Kopf, A.
2012-04-01
The EC-funded project "Deep Sea and Sub-Seafloor Frontier" (DS3F) aims at developing seafloor and sub seafloor sampling strategies for enhanced understanding of deep-sea and sub seafloor processes by connecting marine research in life and geosciences, climate and environmental change, with socio-economic issues and policy building. DS3F has identified access to sub seafloor sampling and instrumentation as a key element of this approach. There is a strong expertise in Europe concerning direct access to the sub seafloor. Within the international program IODP (Integrated Ocean Drilling Program), ECORD (European Consortium for Ocean Research Drilling) has successfully developed the concept of mission specific platforms (MSPs), contracted on a project basis to drill in ice covered and shallow water areas. The ECORD Science Operator, lead by the British Geological Survey (BGS) has build a internationally recognized expertise in scientific ocean drilling, from coring in challenging environment, through down hole measurements and laboratory analysis to core curation and data management. MARUM, at the Bremen University in Germany, is one of the three IODP core repositories. Europe is also at the forefront of scientific seabed drills, with the MeBo developed by MARUM as well as the BGS seabed rocks drills. Europe also plays a important role in continental scientific drilling and the European component of ICDP (International Continental Scientific Drilling Program) is strengthening, with the recent addition of France and foreseen addition of UK. Oceanic and continental drilling have very similar scientific objectives. Moreover, they share not only common technologies, but also common data handling systems. To develop an integrated approach to technology development and usage, a move towards a a distributed infrastructure for research drilling in Europe has been initiated by these different groups. Built on existing research & operational groups across Europe, it will facilitate the sharing of technological and scientific expertise for the benefit of the science community. It will link with other relevant infrastructure initiatives such as EMSO (European Marine Seafloor Observatories). It will raise the profile of scientific drilling in Europe and hopefully lead to better funding opportunities.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Raymond, David W.; Gaither, Katherine N.; Polsky, Yarom
Sandia National Laboratories (Sandia) has a long history in developing compact, mobile, very high-speed drilling systems and this technology could be applied to increasing the rate at which boreholes are drilled during a mine accident response. The present study reviews current technical approaches, primarily based on technology developed under other programs, analyzes mine rescue specific requirements to develop a conceptual mine rescue drilling approach, and finally, proposes development of a phased mine rescue drilling system (MRDS) that accomplishes (1) development of rapid drilling MRDS equipment; (2) structuring improved web communication through the Mine Safety & Health Administration (MSHA) web site;more » (3) development of an improved protocol for employment of existing drilling technology in emergencies; (4) deployment of advanced technologies to complement mine rescue drilling operations during emergency events; and (5) preliminary discussion of potential future technology development of specialized MRDS equipment. This phased approach allows for rapid fielding of a basic system for improved rescue drilling, with the ability to improve the system over time at a reasonable cost.« less
NASA Astrophysics Data System (ADS)
DeBlois, Elisabeth M.; Tracy, Ellen; Janes, G. Gregory; Crowley, Roger D.; Wells, Trudy A.; Williams, Urban P.; Paine, Michael D.; Mathieu, Anne; Kilgour, Bruce W.
2014-12-01
An environmental effects monitoring (EEM) program was developed by Suncor (formerly Petro-Canada) in 1997/98 to assess effects of the Terra Nova offshore oil and gas development on the receiving environment. The Terra Nova Field is located on the Grand Banks approximately 350 km southeast of Newfoundland (Canada), at approximately 100 m water depth. The EEM program was developed with guidance from experts in government, academia and elsewhere, and with input from the public. The EEM program proposed by Suncor was accepted by Canadian regulatory agencies and the program was implemented in 2000, 2001, 2002, 2004, 2006, 2008 and 2010, with pre-development sampling in 1997. The program continues to be implemented every two years. EEM includes an assessment of alterations in sediment quality through examination of changes in sediment chemistry, particle size, toxicity and benthic invertebrate community structure. A second component of the program examines potential effects on two species of commercial fishing interest: Iceland scallop (Chlamys islandica) and American plaice (Hippoglossoides platessoides). Chemical body burden for these two species is examined and taste tests are performed to assess the presence of taint in edible tissues. Effects on American plaice bioindicators are also examined. A final component of the program assesses potential effects of the Terra Nova development on water quality and examines water column chemistry, chlorophyll concentration and physical properties. The papers presented in this collection focus on effects of drill cuttings and drilling muds on the seafloor environment and, as such, report results on sediment quality and bioaccumulation of drilling mud components in Iceland scallop and American plaice. This paper provides information on drilling discharges, an overview of the physical oceanography at the Terra Nova Field, and an overview of the field program designed to assess environmental effects of drilling at Terra Nova.
Interior Department Suggests Improvements for Offshore Arctic Oil and Gas Drilling
NASA Astrophysics Data System (ADS)
Showstack, Randy
2013-03-01
Shell's "difficulties" during its 2012 program to drill offshore oil and natural gas exploration wells in the Alaskan Arctic Ocean "have raised serious questions regarding its ability to operate safely and responsibly in the challenging and unpredictable conditions offshore Alaska," according to the report "Review of Shell's 2012 Alaska Offshore Oil and Gas Exploration Program," issued by the U.S. Department of the Interior (DOI) on 8 March. Noting the company's lack of adequate preparation for drilling in the Arctic, its failure to deploy a specialized Arctic Containment System, and the grounding of the Kulluk drilling rig near Kodiak Island last December, the report recommends that Shell develop a comprehensive and integrated plan describing its future drilling program and related operations and that it commission a third-party audit of its management systems, including its safety and environmental management systems program.
Technology Development and Field Trials of EGS Drilling Systems at Chocolate Mountain
Steven Knudsen
2012-01-01
Polycrystalline diamond compact (PDC) bits are routinely used in the oil and gas industry for drilling medium to hard rock but have not been adopted for geothermal drilling, largely due to past reliability issues and higher purchase costs. The Sandia Geothermal Research Department has recently completed a field demonstration of the applicability of advanced synthetic diamond drill bits for production geothermal drilling. Two commercially-available PDC bits were tested in a geothermal drilling program in the Chocolate Mountains in Southern California. These bits drilled the granitic formations with significantly better Rate of Penetration (ROP) and bit life than the roller cone bit they are compared with. Drilling records and bit performance data along with associated drilling cost savings are presented herein. The drilling trials have demonstrated PDC bit drilling technology has matured for applicability and improvements to geothermal drilling. This will be especially beneficial for development of Enhanced Geothermal Systems whereby resources can be accessed anywhere within the continental US by drilling to deep, hot resources in hard, basement rock formations.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Greener, J.M.; Trimble, G.E.; Singer, G.M.
This paper describes the Opon Gas Field development drilling case history in the Middle Magdalena Basin of north-central Colombia, South America. World class levels of drilling fluid and cementing densities in excess of 22.0 ppg were required to control the extreme pressures encountered. A continuous improvement process is detailed in regard to casing, drilling fluid, cement and related drilling mechanics programs in a severely pressured and environmentally sensitive operation.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Alan Black; Arnis Judzis
2005-09-30
This document details the progress to date on the OPTIMIZATION OF DEEP DRILLING PERFORMANCE--DEVELOPMENT AND BENCHMARK TESTING OF ADVANCED DIAMOND PRODUCT DRILL BITS AND HP/HT FLUIDS TO SIGNIFICANTLY IMPROVE RATES OF PENETRATION contract for the year starting October 2004 through September 2005. The industry cost shared program aims to benchmark drilling rates of penetration in selected simulated deep formations and to significantly improve ROP through a team development of aggressive diamond product drill bit--fluid system technologies. Overall the objectives are as follows: Phase 1--Benchmark ''best in class'' diamond and other product drilling bits and fluids and develop concepts for amore » next level of deep drilling performance; Phase 2--Develop advanced smart bit-fluid prototypes and test at large scale; and Phase 3--Field trial smart bit--fluid concepts, modify as necessary and commercialize products. As of report date, TerraTek has concluded all Phase 1 testing and is planning Phase 2 development.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Alan Black; Arnis Judzis
2004-10-01
The two phase program addresses long-term developments in deep well and hard rock drilling. TerraTek believes that significant improvements in drilling deep hard rock will be obtained by applying ultra-high (greater than 10,000 rpm) rotational speeds. The work includes a feasibility of concept research effort aimed at development and test results that will ultimately result in the ability to reliably drill ''faster and deeper'' possibly with rigs having a smaller footprint to be more mobile. The principle focus is on demonstration testing of diamond bits rotating at speeds in excess of 10,000 rpm to achieve high rate of penetration rockmore » cutting with substantially lower inputs of energy and loads. The project draws on TerraTek results submitted to NASA's ''Drilling on Mars'' program. The objective of that program was to demonstrate miniaturization of a robust and mobile drilling system that expends small amounts of energy. TerraTek successfully tested ultrahigh speed ({approx}40,000 rpm) small kerf diamond coring. Adaptation to the oilfield will require innovative bit designs for full hole drilling or continuous coring and the eventual development of downhole ultra-high speed drives. For domestic operations involving hard rock and deep oil and gas plays, improvements in penetration rates is an opportunity to reduce well costs and make viable certain field developments. An estimate of North American hard rock drilling costs is in excess of $1,200 MM. Thus potential savings of $200 MM to $600 MM are possible if drilling rates are doubled [assuming bit life is reasonable]. The net result for operators is improved profit margin as well as an improved position on reserves. The significance of the ''ultra-high rotary speed drilling system'' is the ability to drill into rock at very low weights on bit and possibly lower energy levels. The drilling and coring industry today does not practice this technology. The highest rotary speed systems in oil field and mining drilling and coring today run less than 10,000 rpm--usually well below 5,000 rpm. This document details the progress to date on the program entitled ''SMALLER FOOTPRINT DRILLING SYSTEM FOR DEEP AND HARD ROCK ENVIRONMENTS; FEASIBILITY OF ULTRA-HIGH SPEED DIAMOND DRILLING'' for the period starting June 23, 2003 through September 30, 2004. TerraTek has reviewed applicable literature and documentation and has convened a project kick-off meeting with Industry Advisors in attendance. TerraTek has designed and planned Phase I bench scale experiments. Some difficulties in obtaining ultra-high speed motors for this feasibility work were encountered though they were sourced mid 2004. TerraTek is progressing through Task 3 ''Small-scale cutting performance tests''. Some improvements over early NASA experiments have been identified.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Alan Black; Arnis Judzis
2004-10-01
The two phase program addresses long-term developments in deep well and hard rock drilling. TerraTek believes that significant improvements in drilling deep hard rock will be obtained by applying ultra-high (greater than 10,000 rpm) rotational speeds. The work includes a feasibility of concept research effort aimed at development and test results that will ultimately result in the ability to reliably drill ''faster and deeper'' possibly with rigs having a smaller footprint to be more mobile. The principle focus is on demonstration testing of diamond bits rotating at speeds in excess of 10,000 rpm to achieve high rate of penetration rockmore » cutting with substantially lower inputs of energy and loads. The project draws on TerraTek results submitted to NASA's ''Drilling on Mars'' program. The objective of that program was to demonstrate miniaturization of a robust and mobile drilling system that expends small amounts of energy. TerraTek successfully tested ultrahigh speed ({approx}40,000 rpm) small kerf diamond coring. Adaptation to the oilfield will require innovative bit designs for full hole drilling or continuous coring and the eventual development of downhole ultra-high speed drives. For domestic operations involving hard rock and deep oil and gas plays, improvements in penetration rates is an opportunity to reduce well costs and make viable certain field developments. An estimate of North American hard rock drilling costs is in excess of $1,200 MM. Thus potential savings of $200 MM to $600 MM are possible if drilling rates are doubled [assuming bit life is reasonable]. The net result for operators is improved profit margin as well as an improved position on reserves. The significance of the ''ultra-high rotary speed drilling system'' is the ability to drill into rock at very low weights on bit and possibly lower energy levels. The drilling and coring industry today does not practice this technology. The highest rotary speed systems in oil field and mining drilling and coring today run less than 10,000 rpm--usually well below 5,000 rpm. This document details the progress to date on the program entitled ''SMALLER FOOTPRINT DRILLING SYSTEM FOR DEEP AND HARD ROCK ENVIRONMENTS; FEASIBILITY OF ULTRA-HIGH SPEED DIAMOND DRILLING'' for the period starting June 23, 2003 through September 30, 2004. (1) TerraTek has reviewed applicable literature and documentation and has convened a project kick-off meeting with Industry Advisors in attendance. (2) TerraTek has designed and planned Phase I bench scale experiments. Some difficulties in obtaining ultra-high speed motors for this feasibility work were encountered though they were sourced mid 2004. (3) TerraTek is progressing through Task 3 ''Small-scale cutting performance tests''. Some improvements over early NASA experiments have been identified.« less
PDC cutters improve drilling in harsh environments
DOE Office of Scientific and Technical Information (OSTI.GOV)
Mensa-Wilmot, G.
2000-02-01
Improvements in polycrystalline diamond compact (PDC) cutter technology have contributed immensely to the industry's acceptance of PDC bits as effective drilling tools. These cutters are being engineered to address the needs and requirements of different drilling programs. Extensive research and developments efforts have been dedicated to the analysis of the diamond table/tungsten carbide interface. The paper describes PDC cutter development, operational challenges, offset performance, and field experiences.
NASA Technical Reports Server (NTRS)
Briggs, G. A.; McKay, C.; George, J.; Derkowski, G.; Cooper, G.; Zacny, K.; Baker, R. Fincher; Pollard, W.; Clifford, S.
2003-01-01
As a project that is part of NASA s Astrobiology Technology & Instrument Development Program (ASTID), we are developing a low mass (approx.20kg) drill that will be operated without drilling fluids and at very low power levels (approx.60 watts electrical) to access and retrieve samples from permafrost regions of Earth and Mars. The drill, designed and built as a joint effort by NASA JSC and Baker-Hughes International, takes the form of a down-hole unit attached to a cable so that it can, in principle, be scaled easily to reach significant depths. A parallel laboratory effort is being carried out at UC Berkeley to characterize the physics of dry drilling under martian conditions of pressure, temperature and atmospheric composition. Data from the UCB and JSC laboratory experiments are being used as input to a drill simulation program which is under development to provide autonomous control of the drill. The first Arctic field test of the unit is planned for May 2004. A field expedition to Eureka on Ellesmere Island in Spring 2003 provided an introduction for several team members to the practical aspects of drilling under Arctic conditions. The field effort was organized by Wayne Pollard of McGill University and Christopher McKay of NASA ARC. A conventional science drill provided by New Zealand colleagues was used to recover ground ice cores for analysis of their microbial content and also to develop techniques using tracers to track the depth of penetration of contamination from the core surface into the interior of the samples.
Field Testing of Environmentally Friendly Drilling System
DOE Office of Scientific and Technical Information (OSTI.GOV)
David Burnett
2009-05-31
The Environmentally Friendly Drilling (EFD) program addresses new low-impact technology that reduces the footprint of drilling activities, integrates light weight drilling rigs with reduced emission engine packages, addresses on-site waste management, optimizes the systems to fit the needs of a specific development sites and provides stewardship of the environment. In addition, the program includes industry, the public, environmental organizations, and elected officials in a collaboration that addresses concerns on development of unconventional natural gas resources in environmentally sensitive areas. The EFD program provides the fundamentals to result in greater access, reasonable regulatory controls, lower development cost and reduction of themore » environmental footprint associated with operations for unconventional natural gas. Industry Sponsors have supported the program with significant financial and technical support. This final report compendium is organized into segments corresponding directly with the DOE approved scope of work for the term 2005-2009 (10 Sections). Each specific project is defined by (a) its goals, (b) its deliverable, and (c) its future direction. A web site has been established that contains all of these detailed engineering reports produced with their efforts. The goals of the project are to (1) identify critical enabling technologies for a prototype low-impact drilling system, (2) test the prototype systems in field laboratories, and (3) demonstrate the advanced technology to show how these practices would benefit the environment.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Arnis Judzis
2003-07-01
This document details the progress to date on the ''OPTIMIZATION OF MUD HAMMER DRILLING PERFORMANCE--A PROGRAM TO BENCHMARK THE VIABILITY OF ADVANCED MUD HAMMER DRILLING'' contract for the quarter starting April 2003 through June 2003. The DOE and TerraTek continue to wait for Novatek on the optimization portion of the testing program (they are completely rebuilding their fluid hammer). Accomplishments included the following: (1) Hughes Christensen has recently expressed interest in the possibility of a program to examine cutter impact testing, which would be useful in a better understanding of the physics of rock impact. Their interest however is notmore » necessarily fluid hammers, but to use the information for drilling bit development. (2) Novatek (cost sharing supplier of tools) has informed the DOE project manager that their tool may not be ready for ''optimization'' testing late summer 2003 (August-September timeframe) as originally anticipated. During 3Q Novatek plans to meet with TerraTek to discuss progress with their tool for 4Q 2003 testing. (3) A task for an addendum to the hammer project related to cutter impact studies was written during 2Q 2003. (4) Smith International internally is upgrading their hammer for the optimization testing phase. One currently known area of improvement is their development program to significantly increase the hammer blow energy.« less
NASA Technical Reports Server (NTRS)
Badescu, Mircea
2014-01-01
Subsurface penetration by coring, drilling or abrading is of great importance for a large number of space and earth applications. An Ultrasonic/Sonic Drill/Corer (USDC) has been in development at JPL's Nondestructive Evaluation and Advanced Actuators (NDEAA) lab as an adaptable tool for many of these applications. The USDC uses a novel drive mechanism to transform the high frequency ultrasonic or sonic vibrations of the tip of a horn into a lower frequency sonic hammering of a drill bit through an intermediate free-flying mass. The USDC device idea has been implemented at various scales from handheld drills to large diameter coring devices. A series of computer programs that model the function and performance of the USDC device were developed and were later integrated into an automated modeling package. The USDC has also evolved from a purely hammering drill to a rotary hammer drill as the design requirements increased form small diameter shallow drilling to large diameter deep coring. A synthesis of the Auto-Gopher development is presented in this paper.
Design of a Performance-Responsive Drill and Practice Algorithm for Computer-Based Training.
ERIC Educational Resources Information Center
Vazquez-Abad, Jesus; LaFleur, Marc
1990-01-01
Reviews criticisms of the use of drill and practice programs in educational computing and describes potentials for its use in instruction. Topics discussed include guidelines for developing computer-based drill and practice; scripted training courseware; item format design; item bank design; and a performance-responsive algorithm for item…
DOE Office of Scientific and Technical Information (OSTI.GOV)
McLellan, G.W.
This test plan describes the field demonstration of the sonic drilling system being conducted as a coordinated effort between the VOC-Arid ID (Integrated Demonstration) and the 200 West Area Carbon Tetrachloride ERA (Expedited Response Action) programs at Hanford. The purpose of this test is to evaluate the Water Development Corporation`s drilling system, modify components as necessary and determine compatible drilling applications for the sonic drilling method for use at facilities in the DOE complex. The sonic demonstration is being conducted as the first field test under the Cooperative Research and Development Agreement (CRADA) which involves the US Department of Energy,more » Pacific Northwest Laboratory, Westinghouse Hanford Company and Water Development Corporation. The sonic drilling system will be used to drill a 45 degree vadose zone well, two vertical wells at the VOC-Arid ID site, and several test holes at the Drilling Technology Test Site north of the 200 Area fire station. Testing at other locations will depend on the performance of the drilling method. Performance of this technology will be compared to the baseline drilling method (cable-tool).« less
Ocean Drilling Program: Drilling Services
Drilling operations team Material services team Development engineering team ODP/TAMU Science Operator Home Services department consists of three team-oriented project groups, which also work to improve the existing team. A member of this team sails with each cruise to provide expertise for the shipboard scientific
Ocean Drilling Program: Public Information: News
site ODP's main web site ODP/TAMU Science Operator Home Ocean Drilling Program News The Ocean Drilling Program was succeeded in 2003 by the Integrated Ocean Drilling Program (IODP). The IODP U.S. Implementing
Rock melting technology and geothermal drilling
NASA Technical Reports Server (NTRS)
Rowley, J. C.
1974-01-01
National awareness of the potential future shortages in energy resources has heightened interest in exploration and utilization of a variety of geothermal energy (GTE) reservoirs. The status of conventional drilling of GTE wells is reviewed briefly and problem areas which lead to higher drilling costs are identified and R and D directions toward solution are suggested. In the immediate future, an expanded program of drilling in GTE formations can benefit from improvements in drilling equipment and technology normally associated with oil or gas wells. Over a longer time period, the new rock-melting drill bits being developed as a part of the Los Alamos Scientific Laboratory's Subterrene Program offer new solutions to a number of problems which frequently hamper GTE drilling, including the most basic problem - high temperature. Two of the most favorable characteristics of rock-melting penetrators are their ability to operate effectively in hot rock and produce glass linings around the hole as an integral part of the drilling process. The technical advantages to be gained by use of rock-melting penetrators are discussed in relation to the basic needs for GTE wells.
High Temperature 300°C Directional Drilling System
DOE Office of Scientific and Technical Information (OSTI.GOV)
Chatterjee, Kamalesh; Aaron, Dick; Macpherson, John
2015-07-31
Many countries around the world, including the USA, have untapped geothermal energy potential. Enhanced Geothermal Systems (EGS) technology is needed to economically utilize this resource. Temperatures in some EGS reservoirs can exceed 300°C. To effectively utilize EGS resources, an array of injector and production wells must be accurately placed in the formation fracture network. This requires a high temperature directional drilling system. Most commercial services for directional drilling systems are rated for 175°C while geothermal wells require operation at much higher temperatures. Two U.S. Department of Energy (DOE) Geothermal Technologies Program (GTP) projects have been initiated to develop a 300°Cmore » capable directional drilling system, the first developing a drill bit, directional motor, and drilling fluid, and the second adding navigation and telemetry systems. This report is for the first project, “High Temperature 300°C Directional Drilling System, including drill bit, directional motor and drilling fluid, for enhanced geothermal systems,” award number DE-EE0002782. The drilling system consists of a drill bit, a directional motor, and drilling fluid. The DOE deliverables are three prototype drilling systems. We have developed three drilling motors; we have developed four roller-cone and five Kymera® bits; and finally, we have developed a 300°C stable drilling fluid, along with a lubricant additive for the metal-to-metal motor. Metal-to-metal directional motors require coatings to the rotor and stator for wear and corrosion resistance, and this coating research has been a significant part of the project. The drill bits performed well in the drill bit simulator test, and the complete drilling system has been tested drilling granite at Baker Hughes’ Experimental Test Facility in Oklahoma. The metal-to-metal motor was additionally subjected to a flow loop test in Baker Hughes’ Celle Technology Center in Germany, where it ran for more than 100 hours.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Alan Black; Arnis Judzis
2003-10-01
This document details the progress to date on the OPTIMIZATION OF DEEP DRILLING PERFORMANCE--DEVELOPMENT AND BENCHMARK TESTING OF ADVANCED DIAMOND PRODUCT DRILL BITS AND HP/HT FLUIDS TO SIGNIFICANTLY IMPROVE RATES OF PENETRATION contract for the year starting October 2002 through September 2002. The industry cost shared program aims to benchmark drilling rates of penetration in selected simulated deep formations and to significantly improve ROP through a team development of aggressive diamond product drill bit--fluid system technologies. Overall the objectives are as follows: Phase 1--Benchmark ''best in class'' diamond and other product drilling bits and fluids and develop concepts for amore » next level of deep drilling performance; Phase 2--Develop advanced smart bit--fluid prototypes and test at large scale; and Phase 3--Field trial smart bit--fluid concepts, modify as necessary and commercialize products. Accomplishments to date include the following: 4Q 2002--Project started; Industry Team was assembled; Kick-off meeting was held at DOE Morgantown; 1Q 2003--Engineering meeting was held at Hughes Christensen, The Woodlands Texas to prepare preliminary plans for development and testing and review equipment needs; Operators started sending information regarding their needs for deep drilling challenges and priorities for large-scale testing experimental matrix; Aramco joined the Industry Team as DEA 148 objectives paralleled the DOE project; 2Q 2003--Engineering and planning for high pressure drilling at TerraTek commenced; 3Q 2003--Continuation of engineering and design work for high pressure drilling at TerraTek; Baker Hughes INTEQ drilling Fluids and Hughes Christensen commence planning for Phase 1 testing--recommendations for bits and fluids.« less
Gas Hydrate Research Site Selection and Operational Research Plans
NASA Astrophysics Data System (ADS)
Collett, T. S.; Boswell, R. M.
2009-12-01
In recent years it has become generally accepted that gas hydrates represent a potential important future energy resource, a significant drilling and production hazard, a potential contributor to global climate change, and a controlling factor in seafloor stability and landslides. Research drilling and coring programs carried out by the Ocean Drilling Program (ODP), the Integrated Ocean Drilling Program (IODP), government agencies, and several consortia have contributed greatly to our understanding of the geologic controls on the occurrence of gas hydrates in marine and permafrost environments. For the most part, each of these field projects were built on the lessons learned from the projects that have gone before them. One of the most important factors contributing to the success of some of the more notable gas hydrate field projects has been the close alignment of project goals with the processes used to select the drill sites and to develop the project’s operational research plans. For example, IODP Expedition 311 used a transect approach to successfully constrain the overall occurrence of gas hydrate within the range of geologic environments within a marine accretionary complex. Earlier gas hydrate research drilling, including IODP Leg 164, were designed primarily to assess the occurrence and nature of marine gas hydrate systems, and relied largely on the presence of anomalous seismic features, including bottom-simulating reflectors and “blanking zones”. While these projects were extremely successful, expeditions today are being increasingly mounted with the primary goal of prospecting for potential gas hydrate production targets, and site selection processes designed to specifically seek out anomalously high-concentrations of gas hydrate are needed. This approach was best demonstrated in a recently completed energy resource focused project, the Gulf of Mexico Gas Hydrate Joint Industry Project Leg II (GOM JIP Leg II), which featured the collection of a comprehensive set of logging-while-drilling (LWD) data through expected gas-hydrate-bearing sand reservoirs in seven wells at three sites in the Gulf of Mexico. The discovery of thick hydrate-bearing sands at two of the sites drilled in the Gulf Mexico validated the integrated geological and geophysical approach used in the pre-drill site selection process to identify gas hydrate reservoirs that may be conducive to energy production. The results of the GOM JIP Leg II LWD expedition are also being used to support the selection of sites for a future drilling, logging, and coring program. Operationally, recent drilling programs, such as ODP Leg 204, IODP Expedition 311, the Japanese Toaki-oki to Kumano-nada drilling leg, the Indian NGHP Expedition 01, and the South Korean Gas Hydrate Research and Development Organization Expedition 01 have demonstrated the great benefit of a multi-leg drilling approach, including the initial acquisition of LWD data that was used to then select sites for the drilling of complex core and wireline logging test holes. It is obvious that a fully integrated site selection approach and a “goal based” operational plan, possibly including numerous drill sites and drilling legs, are required considerations for any future gas hydrate research project.
Report on drilling activities in the Thar Desert, Sindh Province, Pakistan
Thomas, Roger E.; Fassett, James E.; Warwick, Peter D.; Wardlaw, Bruce R.; Shah, Abas A.; Khan, Shafique Ahmed; Tagar, Mohammad A.; Memon, Abdul R.; Lashari, Ghulam S.; Khan, Zameer M.; Khan, Muhammad D.; Chandio, Altaf H.; Anwar, Mohammad; Nizamani, Mohammad A.; Ahmad, Mujeeb; Ur-Raman, Mehtab-
1994-01-01
Coal test drilling in the Thar Desert of southeast Pakistan was conducted as part of the Coal Exploration and Assessment Program (COALREAP) involving the United States Agency for International Development (USAID), the Geological Survey of Pakistan (GSP), and the U.S. Geological Survey. Drilling was performed in the Thar Desert, or Great Indian Desert, approximately 175 km northeast of Karachi. Twenty five exploration holes were drilled between January 1992 and May 1994. Drill core was described by geologists of the Pakistan Geological Survey and coal samples were analyzed in both the United States and Pakistan. U.S. Geological Survey geologists offered technical assistance, trained GSP personnel, and managed the drilling program according to an agreement with USAID under the Energy Planning and Development Project.Drilling was performed by the Geological Survey of Pakistan. During drilling, the first 50 m was rotary drilled and cuttings collected every 2 m for examination. Average depth for all coal beds is 214 m with a total average thickness of 10 m of coal per drill hole. Core was described, boxed, and stored at the Geological Survey of Pakistan core library at Sonda, near Hyderabad. Approximately 6,412 m of Paleocene to Eocene rock was drilled of which 3,990 m was cored and 1,113 m was rotary drilled.There was 1,309 m of core loss. Geophysical logging of each drill hole permitted detailed thicknesses of coal to be determined. Analysis of the coal indicated a rank of lignite B with an as-received heating value over 5,000 Btu.This report presents data collected at the drill sites and should be used inconjunction with the published interpretive report (Fassett and Durrani, 1994) and the USGS Open-File Report 94-167, which contains analysis of the coal samples. Tables provide quick reference to numeric data and results. Detailed index maps and specific data, for each drill hole are included. This report covers drill holes TP-5 to TP-31. Drill holes TP-16, 17, 21, 26, 27, and 29 were planned but not drilled due to time restraints and (or) a determination that those drill sites were not needed to effectively delineate the coal deposit. The basic data for drill holes TP-1 through TP-4 are included in SanFilipo and others, 1994 however, some data for these drill holes are included for consistency.
Automation of cutting and drilling of composite components
NASA Technical Reports Server (NTRS)
Warren, Charles W.
1991-01-01
The task was to develop a preliminary plan for an automated system for the cutting and drilling of advanced aerospace composite components. The goal was to automate the production of these components, but the technology developed can be readily extended to other systems. There is an excellent opportunity for developing a state of the art automated system for the cutting and drilling of large composite components at NASA-Marshall. Most of the major system components are in place: the robot, the water jet pump, and the off-line programming system. The drilling system and the part location system are the only major components that need to be developed. Also, another water jet nozzle and a small amount of high pressure plumbing need to be purchased from, and installed.
The effect of gas and fluid flows on nonlinear lateral vibrations of rotating drill strings
NASA Astrophysics Data System (ADS)
Khajiyeva, Lelya; Kudaibergenov, Askar; Kudaibergenov, Askat
2018-06-01
In this work we develop nonlinear mathematical models describing coupled lateral vibrations of a rotating drill string under the effect of external supersonic gas and internal fluid flows. An axial compressive load and a torque also affect the drill string. The mathematical models are derived by the use of Novozhilov's nonlinear theory of elasticity with implementation of Hamilton's variation principle. Expressions for the gas flow pressure are determined according to the piston theory. The fluid flow is considered as added mass inside the curved tube of the drill string. Using an algorithm developed in the Mathematica computation program on the basis of the Galerkin approach and the stiffness switching method the numerical solution of the obtained approximate differential equations is found. Influences of the external loads, drill string angular speed of rotation, parameters of the gas and fluid flows on the drill string vibrations are shown.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
This paper reports that Phillips Petroleum Co. has an active drilling program in northern Cook inlet 35 miles west of Anchorage, including delineation of an oil field of undetermined size. Phillips is drilling the well from its Tannic platform, built in 1968 to develop North Cook Inlet gas field. Phillips said it might drill another well in March 1993. A plan Phillips field with the state said the company has the capability of drilling 12 oil wells from the Tyonek platform. Depending on results of the 2 Sunfish well, the 12 wells could be drilled from 1992 through March 1995more » at a rate of one well about every 75 days, the company said.« less
A critical review of existing innovative science and drilling proposals within IODP
NASA Astrophysics Data System (ADS)
Behrmann, J. H.
2009-04-01
In the present phase of the Integrated Ocean Drilling Program (IODP) activities are guided by the Initial Science Plan that identified three major themes: The Deep Biosphere and the Subseafloor Ocean; Environmental Change, Processes and Effects; and Solid Earth Cycles and Geodynamics. New initiatives and complex drilling proposals were developed that required major advances in drilling platforms and technologies, and expansion of the drilling community into new areas of specialization. The guiding themes in the Initial Science Plan are instrumental for the proposal development and evaluation, and will continue to represent the goals of IODP until 2013. A number of innovative and highly ranked individual proposals and coordinated sets of proposals ready to be drilled has been forwarded by the Science Planning Committee (SPC) to the IODP Operations Task Force (OTF) for scoping, planning and scheduling. For the Deep Biosphere theme these include proposals to drill targets in the Central Atlantic, the Okinawa Trough, and the Southern Pacific. The Environmental Change, Processes and Effects theme is proposed to - among others - be studied by a coordinated approach regarding the Southeast Asian Monsoon, but also by proposals addressing sdimentation, facies evolution and the paleoclimate record in the Atlantic and Indian Oceans. The Solid Earth Cycles and Geodynamics theme is represented by several proposals addressing subduction processes, seismogenesis, and oceanic crust formation mainly in the Pacific. Some of these have shaped drilling programs that are already in the process of being carried out, such as drilling in the Nankai Trough off Japan (the NantroSEIZE project), or drilling in oceanic crust created in a superfast spreading environment in the Eastern Pacific. There are many remaining issues to be addressed, and drilling programs to be completed before the end of the present phase of IODP in 2013. Planning of expeditions needs to be done in such a way that a balance between risk, cost, and scientific impact is achieved. At least part of the dilling also is required to be a necessary precursor for future investigations in coming phases of Ocean Drilling. Presently IODP faces the challenges of tight budgetary constraints, increasing operating costs of their platforms, and the need to develop drilling schedules that allow off-contract work of the R/V Chikyu and R/V Joides Resolution drilling vessels. Chikyu will operate within IODP for an average of 7 months per year over a 5-year period with the goals of achieving major milestones in NantroSEIZE, maximizing the use of the vessel for riser drilling, and start a new IODP project that requires riser drilling. Joides Resolution will also operate an average of 7 months per year with the goal of optimizing operating days within the restrictions imposed by the prioritized science. Mission Specific Platform expeditions will be carried out once every two years on average, with the goal of pioneering drilling in new, challenging environments. For the first time in IODP history, operations of Chikyu, Joides Resolution and Mission Specific Platform expeditions will be conducted simultaneously in 2009. This new phase of operations provides an unprecedented chance of progress in scientific ocean drilling.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Fisher, E.K.; French, M.R.
East Cameron Block 278 Well B-12 was the first horizontal well drilled in the Gulf of Mexico. This gas well, located in the Texaco Inc. operated Eat Cameron 265 field, was drilled and completed in May 1990. The objective formation was a high-permeability, shallow, unconsolidated gas sand located about 1,450 ft below the mudline (BML). The success of this well proved that horizontal wells are viable alternatives to extended-reach development wells from offshore platforms in the Gulf of Mexico. The cost to drill and complete this horizontal well was less than comparable extended-reach development wells drilled in the same field.more » A minimal increase in drilling costs accompanied by considerable savings in completion costs resulted in favorable economics for the project. Drilling a shallow horizontal well in the Gulf of Mexico presented several challenges. This paper discusses prewell planning, formulation of contingency plans, and implementation of a drilling/completion program designed to meet these challenges.« less
The Realization of Drilling Fault Diagnosis Based on Hybrid Programming with Matlab and VB
NASA Astrophysics Data System (ADS)
Wang, Jiangping; Hu, Yingcai
This paper presents a method using hybrid programming with Matlab and VB based on ActiveX to design the system of drilling accident prediction and diagnosis. So that the powerful calculating function and graphical display function of Matlab and visual development interface of VB are combined fully. The main interface of the diagnosis system is compiled in VB,and the analysis and fault diagnosis are implemented by neural network tool boxes in Matlab.The system has favorable interactive interface,and the fault example validation shows that the diagnosis result is feasible and can meet the demands of drilling accident prediction and diagnosis.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 43 Public Lands: Interior 2 2011-10-01 2011-10-01 false Can my operations plan, drilling permit... MINERALS MANAGEMENT (3000) GEOTHERMAL RESOURCE LEASING Drilling Operations: Getting a Permit § 3261.16 Can my operations plan, drilling permit, and drilling program apply to more than one well? (a) Your...
Scientific Drilling in the Arctic Ocean: A challenge for the next decades
NASA Astrophysics Data System (ADS)
Stein, R.; Coakley, B.
2009-04-01
Although major progress in Arctic Ocean research has been made during the last decades, the knowledge of its short- and long-term paleoceanographic and paleoclimatic history as well as its plate-tectonic evolution is much behind that from the other world's oceans. That means - despite the importance of the Arctic in the climate system - the data base we have from this area is still very weak, and large parts of the climate history have not been recovered at all in sedimentary sections. This lack of knowledge is mainly caused by the major technological/ logistic problems in reaching this permanently ice-covered region with normal research vessels and in retrieving long and undisturbed sediment cores. With the successful completion of IODP Expedition 302 ("Arctic Coring Expedition" - ACEX), the first Mission Specific Platform (MSP) expedition within the Integrated Ocean Drilling Program - IODP, a new era in Arctic research has begun. For the first time, a scientific drilling in the permanently ice-covered Arctic Ocean was carried out, penetrating about 430 meters of Quaternary, Neogene, Paleogene and Campanian sediment on the crest of Lomonosov Ridge close to the North Pole. The success of ACEX has certainly opened the door for further scientific drilling in the Arctic Ocean, and will frame the next round of questions to be answered from new drill holes to be taken during the next decades. In order to discuss and plan the future of scientific drilling in the Arctic Ocean, an international workshop was held at the Alfred Wegener Institute (AWI) in Bremerhaven/Germany, (Nov 03-05, 2008; convenors: Bernard Coakley/University of Alaska Fairbanks and Ruediger Stein/AWI Bremerhaven). About 95 scientists from Europe, US, Canada, Russia, Japan, and Korea, and observers from oil companies participated in the workshop. Funding of the workshop was provided by the Consortium for Ocean Leadership (US), the European Science Foundation, the Arctic Ocean Sciences Board, and the Nansen Arctic Drilling Program as well as by sponsorships from British Petroleum, ConocoPhillips, ExxonMobil, Norwegian Petroleum Directorate, StatoilHydro, and Shell International. The major targets of the workshop were: (1) to bring together an international group of Arctic scientists, young scientists and ocean drilling scientists to learn and exchange ideas, experience and enthusiasm about the Arctic Ocean; (2) to develop a scientific drilling strategy to investigate the tectonic and paleoceanographic history of the Arctic Ocean and its role in influencing the global climate system; (3) to summarize the technical needs, opportunities, and limitations of drilling in the Arctic; (4) to define scientific and drilling targets for specific IODP-type campaigns in Arctic Ocean key areas to be finalized in the development of drilling proposals. Following overview presentations about the history of the Arctic Ocean, legacy of high-latitude ocean drilling, existing site-survey database, technical needs for high-latitude drilling, possibilities of collaboration with industry, and the process of developing ocean-drilling legs through IODP, the main part of the workshop was spent in thematic and regional break-out groups discussing the particular questions to be addressed by drilling and the particular targets for Arctic scientific drilling. Within the working groups, key scientific questions (related to the overall themes paleoceanography, tectonic evolution, petrology/geochemistry of basement, and gas hydrates) and strategies for reaching the overall goals were discussed and - as one of the main results - core groups for further developing drilling proposals were formed. Based on discussions at this workshop, approximately ten new pre-proposals are planned to be submitted to IODP for the April 01- 2009 deadline. We hope that the development of new scientific objectives through the pre-proposal process will help reshape plans for scientific ocean drilling beyond 2013 and direct the program north towards these critical priorities and advance exploration of the Arctic.
Using DSDP/ODP/IODP core photographs and digital images in the classroom
NASA Astrophysics Data System (ADS)
Pereira, Hélder; Berenguer, Jean-Luc
2017-04-01
Since the late 1960's, several scientific ocean drilling programmes have been uncovering the history of the Earth hidden beneath the seafloor. The adventure began in 1968 with the Deep Sea Drilling Project (DSDP) and its special drill ship, the Glomar Challenger. The next stage was the Ocean Drilling Program (ODP) launched in 1985 with a new drill ship, the JOIDES Resolution. The exploration of the ocean seafloor continued, between 2003 and 2013, through the Integrated Ocean Drilling Program (IODP). During that time, in addition to the JOIDES Resolution, operated by the US, the scientists had at their service the Chikyu, operated by Japan, and Mission-Specific-Platforms, funded and implemented by the European Consortium for Ocean Research Drilling. Currently, scientific ocean drilling continues through the collaboration of scientists from 25 nations within the International Ocean Discovery Program (IODP). Over the last 50 years, the scientific ocean drilling expeditions conducted by these programmes have drilled and cored more than 3500 holes. The numerous sediment and rock samples recovered from the ocean floor have provided important insight on the active biological, chemical, and geological processes that have shaped the Earth over millions of years. During an expedition, once the 9.5-meter long cores arrive from the seafloor, the technicians label and cut them into 1.5-meter sections. Next, the shipboard scientists perform several analysis using non-destructive methods. Afterward, the technicians split the cores into two halves, the "working half", which scientists sample and use aboard the drilling platform, and the "archive half", which is kept in untouched condition after being visually described and photographed with a digital imaging system. The shipboard photographer also takes several close-up pictures of the archive-half core sections. This work presents some examples of how teachers can use DSDP/ODP/IODP core photographs and digital images, available through the Janus and LIMS online databases, to develop inquiry-based learning activities for secondary level students.
Pre-Gas Drilling Drinking Water Testing--An Educational Opportunity for Extension
ERIC Educational Resources Information Center
Swistock, Brian; Clark, James
2015-01-01
The increase in shale gas drilling in Pennsylvania has resulted in thousands of landowners receiving predrilling testing of their drinking water. Landowners often have difficulty understanding test reports resulting in low awareness of pre-existing problems. Extension and several partners developed a program to improve understanding of…
Development of a novel ice-resistant semisubmersible drilling unit
DOE Office of Scientific and Technical Information (OSTI.GOV)
Corona, E.N.; Schloerb, D.W.; Yashima, N.
1983-05-01
A multiyear program was initiated by ARCO Alaska, Inc. to assess the operational feasibility of drilling operations year-round in the ice-covered waters of the Bering, Chukchi, and Beaufort Seas. ARCO Alaska, Inc. is considering several alternative concepts for year-round drilling in the Bering Sea. One such concept, the Ice-Resistant Semisubmersible Drilling Unit, is a design concept of Mitsui Engineering and Shipbuilding Company. The design is intended to operate in broken, continuous, and ridged sea ice, and withstand severe open water sea conditions. The requirement to operate in two dissimilar environments results in a unit that is somewhat unusual when comparedmore » to typical semisubmersible drilling units.« less
Contamination Tracer Testing With Seabed Rock Drills: IODP Expedition 357
NASA Astrophysics Data System (ADS)
Orcutt, B.; Bergenthal, M.; Freudenthal, T.; Smith, D. J.; Lilley, M. D.; Schneiders, L.; Fruh-Green, G. L.
2016-12-01
IODP Expedition 357 utilized seabed rock drills for the first time in the history of the ocean drilling program, with the aim of collecting intact core of shallow mantle sequences from the Atlantis Massif to examine serpentinization processes and the deep biosphere. This new drilling approach required the development of a new system for delivering synthetic tracers during drilling to assess for possible sample contamination. Here, we describe this new tracer delivery system, assess the performance of the system during the expedition, provide an overview of the quality of the core samples collected for deep biosphere investigations based on tracer concentrations, and make recommendations for future applications of the system.
Contamination tracer testing with seabed drills: IODP Expedition 357
NASA Astrophysics Data System (ADS)
Orcutt, Beth N.; Bergenthal, Markus; Freudenthal, Tim; Smith, David; Lilley, Marvin D.; Schnieders, Luzie; Green, Sophie; Früh-Green, Gretchen L.
2017-11-01
IODP Expedition 357 utilized seabed drills for the first time in the history of the ocean drilling program, with the aim of collecting intact sequences of shallow mantle core from the Atlantis Massif to examine serpentinization processes and the deep biosphere. This novel drilling approach required the development of a new remote seafloor system for delivering synthetic tracers during drilling to assess for possible sample contamination. Here, we describe this new tracer delivery system, assess the performance of the system during the expedition, provide an overview of the quality of the core samples collected for deep biosphere investigations based on tracer concentrations, and make recommendations for future applications of the system.
30 CFR 250.456 - What safe practices must the drilling fluid program follow?
Code of Federal Regulations, 2010 CFR
2010-07-01
... INTERIOR OFFSHORE OIL AND GAS AND SULPHUR OPERATIONS IN THE OUTER CONTINENTAL SHELF Oil and Gas Drilling Operations Drilling Fluid Requirements § 250.456 What safe practices must the drilling fluid program follow... 30 Mineral Resources 2 2010-07-01 2010-07-01 false What safe practices must the drilling fluid...
Beyond 2013 - The Future of European Scientific Drilling Research - An introduction.
NASA Astrophysics Data System (ADS)
Camoin, G.; Stein, R.
2009-04-01
The Integrated Ocean Drilling Program (IODP) is funded for the period 2003-2013, and is now starting to plan the future of ocean drilling beyond 2013, including the development of new technologies, new emerging research fields as and the societal relevance of this programme. In this context an interdisciplinary and multinational (USA, Europe, Japan, Asian and Oceanian countries), key conference - INVEST IODP New Ventures in Exploring Scientific Targets - addressing all international IODP partners is therefore planned for September 23rd-25th 2009 in Bremen, Germany (more information at http://www.iodp.org and http://marum.de/iodp-invest.html) to discuss future directions of ocean drilling research and related aspects such as ventures with related programmes or with industry. The first critical step of INVEST is to define the scientific research goals of the second phase of the Integrated Ocean Drilling Program (IODP), which is expected to begin in late 2013. INVEST will be open to all interested scientists and students and will be the principal opportunity for the international science community to help shape the future of scientific ocean drilling. The outcome of the conference will be the base to draft a science plan in 2010 and to define new goals and strategies to effectively meet the challenges of society and future ocean drilling. The current EGU Session and the related two days workshop which will be held at the University of Vienna will specifically address the future of European scientific drilling research. The major objectives of those two events are to sharpen the European interests in the future IODP and to prepare the INVEST Conference and are therefore of prime importance to give weight to the European propositions in the program renewal processes, both on science, technology and management, and to provide the participants with information about the status/process of ongoing discussions and negotiations regarding program structure, and provide them with the expected framework (available drilling platforms and anticipated funding levels). The key items that should be addressed during the EGU Session and the workshop will especially include : (1) The future of ECORD (science, technology, management). (2) New research initiatives and emerging fields in scientific drilling (3) Relationships between IODP and other programs (e.g. ICDP, IMAGES etc). (4) Collaboration between academia and industry. (5) New technologies and the Mission Specific Platform approach.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 43 Public Lands: Interior 2 2013-10-01 2013-10-01 false Can my operations plan, drilling permit, and drilling program apply to more than one well? 3261.16 Section 3261.16 Public Lands: Interior... MINERALS MANAGEMENT (3000) GEOTHERMAL RESOURCE LEASING Drilling Operations: Getting a Permit § 3261.16 Can...
Code of Federal Regulations, 2014 CFR
2014-10-01
... 43 Public Lands: Interior 2 2014-10-01 2014-10-01 false Can my operations plan, drilling permit, and drilling program apply to more than one well? 3261.16 Section 3261.16 Public Lands: Interior... MINERALS MANAGEMENT (3000) GEOTHERMAL RESOURCE LEASING Drilling Operations: Getting a Permit § 3261.16 Can...
Code of Federal Regulations, 2012 CFR
2012-10-01
... 43 Public Lands: Interior 2 2012-10-01 2012-10-01 false Can my operations plan, drilling permit, and drilling program apply to more than one well? 3261.16 Section 3261.16 Public Lands: Interior... MINERALS MANAGEMENT (3000) GEOTHERMAL RESOURCE LEASING Drilling Operations: Getting a Permit § 3261.16 Can...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Arnis Judzis; Alan Black; Homer Robertson
2006-03-01
The two phase program addresses long-term developments in deep well and hard rock drilling. TerraTek believes that significant improvements in drilling deep hard rock will be obtained by applying ultra-high rotational speeds (greater than 10,000 rpm). The work includes a feasibility of concept research effort aimed at development that will ultimately result in the ability to reliably drill ''faster and deeper'' possibly with smaller, more mobile rigs. The principle focus is on demonstration testing of diamond bits rotating at speeds in excess of 10,000 rpm to achieve high rate of penetration (ROP) rock cutting with substantially lower inputs of energymore » and loads. The significance of the ultra-high rotary speed drilling system is the ability to drill into rock at very low weights on bit and possibly lower energy levels. The drilling and coring industry today does not practice this technology. The highest rotary speed systems in oil field and mining drilling and coring today run less than 10,000 rpm--usually well below 5,000 rpm. This document details the progress to date on the program entitled ''Smaller Footprint Drilling System for Deep and Hard Rock Environments: Feasibility of Ultra-High-Speed Diamond Drilling'' for the period starting 1 October 2004 through 30 September 2005. Additionally, research activity from 1 October 2005 through 28 February 2006 is included in this report: (1) TerraTek reviewed applicable literature and documentation and convened a project kick-off meeting with Industry Advisors in attendance. (2) TerraTek designed and planned Phase I bench scale experiments. Some difficulties continue in obtaining ultra-high speed motors. Improvements have been made to the loading mechanism and the rotational speed monitoring instrumentation. New drill bit designs have been provided to vendors for production. A more consistent product is required to minimize the differences in bit performance. A test matrix for the final core bit testing program has been completed. (3) TerraTek is progressing through Task 3 ''Small-scale cutting performance tests''. (4) Significant testing has been performed on nine different rocks. (5) Bit balling has been observed on some rock and seems to be more pronounces at higher rotational speeds. (6) Preliminary analysis of data has been completed and indicates that decreased specific energy is required as the rotational speed increases (Task 4). This data analysis has been used to direct the efforts of the final testing for Phase I (Task 5). (7) Technology transfer (Task 6) has begun with technical presentations to the industry (see Judzis).« less
Rice, Hannah M; Saunders, Samantha C; McGuire, Stephen J; O'Leary, Thomas J; Izard, Rachel M
2018-03-26
Foot drill is a key component of military training and is characterized by frequent heel stamping, likely resulting in high tibial shock magnitudes. Higher tibial shock during running has previously been associated with risk of lower limb stress fractures, which are prevalent among military populations. Quantification of tibial shock during drill training is, therefore, warranted. This study aimed to provide estimates of tibial shock during military drill in British Army Basic training. The study also aimed to compare values between men and women, and to identify any differences between the first and final sessions of training. Tibial accelerometers were secured on the right medial, distal shank of 10 British Army recruits (n = 5 men; n = 5 women) throughout a scheduled drill training session in week 1 and week 12 of basic military training. Peak positive accelerations, the average magnitude above given thresholds, and the rate at which each threshold was exceeded were quantified. Mean (SD) peak positive acceleration was 20.8 (2.2) g across all sessions, which is considerably higher than values typically observed during high impact physical activity. Magnitudes of tibial shock were higher in men than women, and higher in week 12 compared with week 1 of training. This study provides the first estimates of tibial shock magnitude during military drill training in the field. The high values suggest that military drill is a demanding activity and this should be considered when developing and evaluating military training programs. Further exploration is required to understand the response of the lower limb to military drill training and the etiology of these responses in the development of lower limb stress fractures.
DOE Office of Scientific and Technical Information (OSTI.GOV)
De La Fosse, P.H.; Black, A.D.; DiBona, B.G.
1983-01-01
A major limitation of downhole mud motors for geothermal drilling, as well as straight-hole oil and gas drilling, is the bearing section. Reduced bearing life results from the inability to seal a lubricant in the bearing pack. A reliable rotary seal will extend the bearing life and will allow high pressure drops across the bit for improved bottomhole cleaning and increased drilling rate. This paper summarizes the results of a six-year program funded by the U.S. Department of Energy/Division of Geothermal Energy to develop a sealed bearing pack for use with downhole motors in geothermal applications. Descriptions of the Sealmore » Test Machine, Lubricant Test Machine and Bearing Pack Test Facility are presented. Summaries of all seal tests, lubricant tests and bearing pack tests are provided; and a comprehensive program bibliography is presented.« less
Review-Esso Resources Canada Ltd. , Norman Wells expansion project drilling program
DOE Office of Scientific and Technical Information (OSTI.GOV)
Schaef, D.G.
Esso Resources Canada Limited has embarked on a project to increase production from its Norman Wells Oil field located 145 km south of the Arctic Circle, from 475 m/sup 3//D to 4000 m/sup 3//D of crude oil. This paper provides details on the development drilling portion of the project which is comprised of 150 wells to be drilled in 3 years utilizing 2 drilling rigs from July 1982 through September 1985. The majority of the wells will be directionally drilled from multiwell land pads and artificial islands to shallow reservoir targets underlying the Mackenzie River, a major river intersecting themore » field boundaries. Experience from the initial 27 wells completed is provided.« less
NASA Astrophysics Data System (ADS)
Peart, L.; Niemitz, M.; Boa, S.; Corsiglia, J.; Klaus, A.; Petronotis, K.; Iturrino, G.
2005-12-01
For 37 years, scientific ocean drilling programs have sponsored hundreds of expeditions, drilled at over 1,800 sites and recovered over 200 miles of core. The discoveries of these programs have led to important realizations of how our earth works. Past expeditions have validated the theory of plate tectonics, provided unparalleled ancient climate records and recovered evidence of the asteroid impact that wiped out the dinosaurs 65 million years ago - and new discoveries occur with every expedition. By producing education materials and programs and encouraging mass media journalists' interest in our news, we strive to fulfill our commitment to communicate our programs' scientific discoveries to the public, in a way that people - not just other scientists - understand. With the advent of the Integrated Ocean Drilling Program (IODP), education and outreach efforts have expanded to pursue new opportunities and engage wider audiences. Through our strategy of Teaching for Science, Learning for LifeTM, our education efforts seek to utilize the interdisciplinary nature of scientific ocean drilling to teach career awareness, scientific methods, teamwork, and problem solving techniques for a lifetime of learning, decision making and good citizenship. In pursuit of this goal, we have implemented professional and resource development programs and expanded our outreach at education-focused conferences to help teachers use IODP science to satiate the student's need to learn the methods of science that apply to everyday life. We believe that this message also applies to life-long learners and thus we have focused our efforts on news media outreach and education opportunities surrounding ports of call of the JOIDES Resolution, permanent and traveling museum exhibits. In addition, our outreach to undergraduate and graduate audiences, through a lecture series, research fellowships and internships, helps to create future generations of science leaders.
Stamm, Robert G.
2018-06-08
BackgroundIn the fall of 2011, the U.S. Geological Survey (USGS) was afforded an opportunity to participate in an environmental monitoring study of the potential impacts of a deep, unconventional Marcellus Shale hydraulic fracturing site. The drill site of the prospective case study is the “Range Resources MCC Partners L.P. Units 1-5H” location (also referred to as the “RR–MCC” drill site), located in Washington County, southwestern Pennsylvania. Specifically, the USGS was approached to provide a geologic framework that would (1) provide geologic parameters for the proposed area of a localized groundwater circulation model, and (2) provide potential information for the siting of both shallow and deep groundwater monitoring wells located near the drill pad and the deviated drill legs.The lead organization of the prospective case study of the RR–MCC drill site was the Groundwater and Ecosystems Restoration Division (GWERD) of the U.S. Environmental Protection Agency. Aside from the USGS, additional partners/participants were to include the Department of Energy, the Pennsylvania Geological Survey, the Pennsylvania Department of Environmental Protection, and the developer Range Resources LLC. During the initial cooperative phase, GWERD, with input from the participating agencies, drafted a Quality Assurance Project Plan (QAPP) that proposed much of the objectives, tasks, sampling and analytical procedures, and documentation of results.Later in 2012, the proposed cooperative agreement between the aforementioned partners and the associated land owners for a monitoring program at the drill site was not executed. Therefore, the prospective case study of the RR–MCC site was terminated and no installation of groundwater monitoring wells nor the collection of nearby soil, stream sediment, and surface-water samples were made.Prior to the completion of the QAPP and termination of the perspective case study the geologic framework was rapidly conducted and nearly completed. This was done for three principal reasons. First, there was an immediate need to know the distribution of the relatively undisturbed surface to near-surface bedrock geology and unconsolidated materials for the collection of baseline surface data prior to drill site development (drill pad access road, drill pad leveling) and later during monitoring associated with well drilling, well development, and well production. Second, it was necessary to know the bedrock geology to support the siting of: (1) multiple shallow groundwater monitoring wells (possibly as many as four) surrounding and located immediately adjacent to the drill pad, and (2) deep groundwater monitoring wells (possibly two) located at distance from the drill pad with one possibly being sited along one of the deviated production drill legs. Lastly, the framework geology would provide the lateral extent, thickness, lithology, and expected discontinuities of geologic units (to be parsed or grouped as hydrostratigraphic units) and regional structure trends as inputs into the groundwater model.This report provides the methodology of geologic data accumulation and aggregation, and its integration into a geographic information system (GIS) based program. The GIS program will allow multiple data to be exported in various formats (shapefiles [.shp], database files [.dbf], and Keyhole Markup Language files [.KML]) for use in surface and subsurface geologic site characterization, for sampling strategies, and for inputs for groundwater modeling.
Development of a high-temperature diagnostics-while-drilling tool.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Chavira, David J.; Huey, David; Hetmaniak, Chris
2009-01-01
The envisioned benefits of Diagnostics-While-Drilling (DWD) are based on the principle that high-speed, real-time information from the downhole environment will promote better control of the drilling process. Although in practice a DWD system could provide information related to any aspect of exploration and production of subsurface resources, the current DWD system provides data on drilling dynamics. This particular set of new tools provided by DWD will allow quicker detection of problems, reduce drilling flat-time and facilitate more efficient drilling (drilling optimization) with the overarching result of decreased drilling costs. In addition to providing the driller with an improved, real-time picturemore » of the drilling conditions downhole, data generated from DWD systems provides researchers with valuable, high fidelity data sets necessary for developing and validating enhanced understanding of the drilling process. Toward this end, the availability of DWD creates a synergy with other Sandia Geothermal programs, such as the hard-rock bit program, where the introduction of alternative rock-reduction technologies are contingent on the reduction or elimination of damaging dynamic effects. More detailed descriptions of the rationale for the program and early development efforts are described in more detail by others [SAND2003-2069 and SAND2000-0239]. A first-generation low-temperature (LT) DWD system was fielded in a series of proof-of-concept tests (POC) to validate functionality. Using the LT system, DWD was subsequently used to support a single-laboratory/multiple-partner CRADA (Cooperative Research and Development Agreement) entitled Advanced Drag Bits for Hard-Rock Drilling. The drag-bit CRADA was established between Sandia and four bit companies, and involved testing of a PDC bit from each company [Wise, et al., 2003, 2004] in the same lithologic interval at the Gas Technology Institute (GTI) test facility near Catoosa, OK. In addition, the LT DWD system has been fielded in cost-sharing efforts with an industrial partner to support the development of new generation hard-rock drag bits. Following the demonstrated success of the POC DWD system, efforts were initiated in FY05 to design, fabricate and test a high-temperature (HT) capable version of the DWD system. The design temperature for the HT DWD system was 225 C. Programmatic requirements dictated that a HT DWD tool be developed during FY05 and that a working system be demonstrated before the end of FY05. During initial design discussions regarding a high-temperature system it was decided that, to the extent possible, the HT DWD system would maintain functionality similar to the low temperature system, that is, the HT DWD system would also be designed to provide the driller with real-time information on bit and bottom-hole-assembly (BHA) dynamics while drilling. Additionally, because of time and fiscal constraints associated with the HT system development, the design of the HT DWD tool would follow that of the LT tool. The downhole electronics package would be contained in a concentrically located pressure barrel and the use of externally applied strain gages with thru-tool connectors would also be used in the new design. Also, in order to maximize the potential wells available for the HT DWD system and to allow better comparison with the low-temperature design, the diameter of the tool was maintained at 7-inches. This report discusses the efforts associated with the development of a DWD system capable of sustained operation at 225 C. This report documents work performed in the second phase of the Diagnostics-While-Drilling (DWD) project in which a high-temperature (HT) version of the phase 1 low-temperature (LT) proof-of-concept (POC) DWD tool was built and tested. Descriptions of the design, fabrication and field testing of the HT tool are provided. Background on prior phases of the project can be found in SAND2003-2069 and SAND2000-0239.« less
30 CFR 250.455 - What are the general requirements for a drilling fluid program?
Code of Federal Regulations, 2014 CFR
2014-07-01
... drilling fluid program? 250.455 Section 250.455 Mineral Resources BUREAU OF SAFETY AND ENVIRONMENTAL ENFORCEMENT, DEPARTMENT OF THE INTERIOR OFFSHORE OIL AND GAS AND SULPHUR OPERATIONS IN THE OUTER CONTINENTAL SHELF Oil and Gas Drilling Operations Drilling Fluid Requirements § 250.455 What are the general...
30 CFR 250.455 - What are the general requirements for a drilling fluid program?
Code of Federal Regulations, 2013 CFR
2013-07-01
... drilling fluid program? 250.455 Section 250.455 Mineral Resources BUREAU OF SAFETY AND ENVIRONMENTAL ENFORCEMENT, DEPARTMENT OF THE INTERIOR OFFSHORE OIL AND GAS AND SULPHUR OPERATIONS IN THE OUTER CONTINENTAL SHELF Oil and Gas Drilling Operations Drilling Fluid Requirements § 250.455 What are the general...
30 CFR 250.455 - What are the general requirements for a drilling fluid program?
Code of Federal Regulations, 2012 CFR
2012-07-01
... drilling fluid program? 250.455 Section 250.455 Mineral Resources BUREAU OF SAFETY AND ENVIRONMENTAL ENFORCEMENT, DEPARTMENT OF THE INTERIOR OFFSHORE OIL AND GAS AND SULPHUR OPERATIONS IN THE OUTER CONTINENTAL SHELF Oil and Gas Drilling Operations Drilling Fluid Requirements § 250.455 What are the general...
30 CFR 250.455 - What are the general requirements for a drilling fluid program?
Code of Federal Regulations, 2010 CFR
2010-07-01
... drilling fluid program? 250.455 Section 250.455 Mineral Resources MINERALS MANAGEMENT SERVICE, DEPARTMENT OF THE INTERIOR OFFSHORE OIL AND GAS AND SULPHUR OPERATIONS IN THE OUTER CONTINENTAL SHELF Oil and Gas Drilling Operations Drilling Fluid Requirements § 250.455 What are the general requirements for a...
30 CFR 250.455 - What are the general requirements for a drilling fluid program?
Code of Federal Regulations, 2011 CFR
2011-07-01
... drilling fluid program? 250.455 Section 250.455 Mineral Resources BUREAU OF OCEAN ENERGY MANAGEMENT, REGULATION, AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR OFFSHORE OIL AND GAS AND SULPHUR OPERATIONS IN THE OUTER CONTINENTAL SHELF Oil and Gas Drilling Operations Drilling Fluid Requirements § 250.455 What are...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Heckman, B.K.; Chinn, V.K.
1981-01-01
The development and use of computer programs written to produce the paper tape needed for the automation, or numeric control, of drill presses employed to fabricate computed-designed printed circuit boards are described. (LCL)
Application of drilling, coring, and sampling techniques to test holes and wells
Shuter, Eugene; Teasdale, Warren E.
1989-01-01
The purpose of this manual is to provide ground-water hydrologists with a working knowledge of the techniques of test drilling, auger drilling, coring and sampling, and the related drilling and sampling equipment. For the most part, the techniques discussed deal with drilling, sampling, and completion of test holes in unconsolidated sediments because a hydrologist is interested primarily in shallow-aquifer data in this type of lithology. Successful drilling and coring of these materials usually is difficult, and published research information on the subject is not readily available. The authors emphasize in-situ sampling of unconsolidated sediments to obtain virtually undisturbed samples. Particular attention is given to auger drilling and hydraulic-rotary methods of drilling because these are the principal means of test drilling performed by the U.S. Geological Survey during hydrologic studies. Techniques for sampling areas contaminated by solid or liquid waste are discussed. Basic concepts of well development and a detailed discussion of drilling muds, as related to hole conditioning, also are included in the report. The information contained in this manual is intended to help ground-water hydrologists obtain useful subsurface data and samples from their drilling programs.
Ocean Drilling Program: Cruise Information
Morgan. Cruise Information The Ocean Drilling Program ended on 30 September 2003 and has been succeeded by the Integrated Ocean Drilling Program (IODP). The U.S. Implementing Organization (IODP-USIO ) (Consortium for Ocean Leadership, Lamont-Doherty Earth Observatory, and Texas A&M University) continues to
Scientific Ocean Drilling: A Legacy of ODP Education and Community Engagement by JOI/USSSP
NASA Astrophysics Data System (ADS)
Johnson, A.; Cortes, M.; Farrell, J. W.
2003-12-01
The U.S. Science Support Program (USSSP) was established in 1986 to support the participation of U.S. scientists in the international Ocean Drilling Program (ODP). Since inception, USSSP has been managed by Joint Oceanographic Institutions (JOI), through a cooperative agreement with NSF, and guided by the U.S. Science Advisory Committee (USSAC). One of USSSP's primary goals has been to enhance the scientific contribution of ocean drilling and to maintain its vitality through a broad range of education and outreach activities. USSSP's first educational program, the Schlanger Ocean Drilling Fellowship, was established to encourage doctoral candidates to conduct research aboard the ODP drill ship, JOIDES Resolution. Since 1987, 74 fellowships have been awarded and the program has been expanded to include shorebased ODP-related research and Masters degree candidates. USSSP's second major educational activity is the Distinguished Lecturer Series. To date, 70 scientists have spoken about their ODP research at 334 institutions, effectively reaching new and diverse educational communities. In addition, USSSP has developed and distributed two interactive educational CD-ROMs (ODP: Mountains to Monsoons and Gateways to Glaciation) and an educational poster (Blast from the Past). All three items are popular supplements in classrooms from middle school to college because they present accessible scientific content, demonstrate the scientific method, and illustrate the collaborative and international nature of scientific research. USSSP's outreach efforts have included publishing the JOI/USSAC Newsletter since 1988 and ODP's Greatest Hits (abstracts written by U.S. scientists). The latter is broadly used because it communicates exciting scientific results in lay terms. USSSP has sponsored other educational efforts including a workshop to seek recommendations for educational activities to be associated with future scientific ocean drilling. NSF is currently considering the response to their solicitation of proposals to manage a successor program to USSSP, which will support the involvement of U.S. scientists in the new Integrated Ocean Drilling Program. The educational and outreach component of the new USSSP will target students at all levels, building upon improving on the USSSP-ODP achievements.
HOLEGAGE 1.0 - STRAIN GAGE HOLE DRILLING ANALYSIS PROGRAM
NASA Technical Reports Server (NTRS)
Hampton, R. W.
1994-01-01
There is no simple and perfect way to measure residual stresses in metal parts that have been welded or deformed to make complex structures such as pressure vessels and aircraft, yet these locked-in stresses can contribute to structural failure by fatigue and fracture. However, one proven and tested technique for determining the internal stress of a metal part is to drill a test hole while measuring the relieved strains around the hole, such as the hole-drilling strain gage method described in ASTM E 837. The program HOLEGAGE processes strain gage data and provides additional calculations of internal stress variations that are not obtained with standard E 837 analysis methods. The typical application of the technique uses a three gage rosette with a special hole-drilling fixture for drilling a hole through the center of the rosette to produce a hole with very small gage pattern eccentricity error. Another device is used to control the drilling and halt the drill at controlled depth steps. At each step, strains from all three strain gages are recorded. The influence coefficients used by HOLEGAGE to compute stresses from relieved hole strains were developed by published finite element method studies of thick plates for specific hole sizes and depths. The program uses a parabolic fit and an interpolating scheme to project the coefficients to other hole sizes and depths. Additionally, published experimental data are used to extend the coefficients to relatively thin plates. These influence coefficients are used to compute the stresses in the original part from the strain data. HOLEGAGE will compute interior planar stresses using strain data from each drilled hole depth layer. Planar stresses may be computed in three ways including: a least squares fit for a linear variation with depth, an integral method to give incremental stress data for each layer, or by a linear fit to the integral data (with some surface data points omitted) to predict surface stresses before strain gage sanding preparations introduced additional residual stresses. Options are included for estimating the effect of hole eccentricity on calculations, smoothing noise from the strain data, and inputting the program data either interactively or from a data file. HOLEGAGE was written in FORTRAN 77 for DEC VAX computers under VMS, and is transportable except for system-unique TIME and DATE system calls. The program requires 54K of main memory and was developed in 1990. The program is available on a 9-track 1600 BPI VAX BACKUP format magnetic tape (standard media) or a TK50 tape cartridge. The documentation is included on the tape. DEC VAX and VMS are trademarks of Digital Equipment Corporation.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Arnis Judzis; Homer Robertson; Alan Black
2006-06-22
The two phase program addresses long-term developments in deep well and hard rock drilling. TerraTek believes that significant improvements in drilling deep hard rock will be obtained by applying ultra-high rotational speeds (greater than 10,000 rpm). The work includes a feasibility of concept research effort aimed at development that will ultimately result in the ability to reliably drill ''faster and deeper'' possibly with smaller, more mobile rigs. The principle focus is on demonstration testing of diamond bits rotating at speeds in excess of 10,000 rpm to achieve high rate of penetration (ROP) rock cutting with substantially lower inputs of energymore » and loads. The significance of the ''ultra-high rotary speed drilling system'' is the ability to drill into rock at very low weights on bit and possibly lower energy levels. The drilling and coring industry today does not practice this technology. The highest rotary speed systems in oil field and mining drilling and coring today run less than 10,000 rpm-usually well below 5,000 rpm. This document details the progress at the end of Phase 1 on the program entitled ''Smaller Footprint Drilling System for Deep and Hard Rock Environments: Feasibility of Ultra-High-Speed Diamond Drilling'' for the period starting 1 March 2006 and concluding 30 June 2006. (Note: Results from 1 September 2005 through 28 February 2006 were included in the previous report (see Judzis, Black, and Robertson)). Summarizing the accomplished during Phase 1: {lg_bullet} TerraTek reviewed applicable literature and documentation and convened a project kickoff meeting with Industry Advisors in attendance (see Black and Judzis). {lg_bullet} TerraTek designed and planned Phase I bench scale experiments (See Black and Judzis). Some difficulties continued in obtaining ultra-high speed motors. Improvements were made to the loading mechanism and the rotational speed monitoring instrumentation. New drill bit designs were developed to provided a more consistent product with consistent performance. A test matrix for the final core bit testing program was completed. {lg_bullet} TerraTek concluded Task 3 ''Small-scale cutting performance tests.'' {sm_bullet} Significant testing was performed on nine different rocks. {sm_bullet} Five rocks were used for the final testing. The final tests were based on statistical design of experiments. {sm_bullet} Two full-faced bits, a small diameter and a large diameter, were run in Berea sandstone. {lg_bullet} Analysis of data was completed and indicates that there is decreased specific energy as the rotational speed increases (Task 4). Data analysis from early trials was used to direct the efforts of the final testing for Phase I (Task 5). {lg_bullet} Technology transfer (Task 6) was accomplished with technical presentations to the industry (see Judzis, Boucher, McCammon, and Black).« less
A HyperCard Program for Business German.
ERIC Educational Resources Information Center
Paulsell, Patricia R.
Although the use of computer-assisted language instruction software has been mainly limited to grammatical/syntactical drills, the increasing number of language professionals with programming skills is leading to the development of more sophisticated language education programs. This report describes the generation of such a program using the…
Ocean Drilling Science Plan to be released soon
NASA Astrophysics Data System (ADS)
Showstack, Randy
2011-04-01
The upcoming International Ocean Discovery Program, which is slated to operate from 2013 to 2023 and calls for an internationally funded program focused around four science themes, will pick up right where its predecessor, the Integrated Ocean Drilling Program, ends, explained Kiyoshi Suyehiro, president and chief executive officer of IODP, a convenient acronym that covers both programs. At a 5 April briefing at the 2011 European Geosciences Union General Assembly in Vienna, Austria, he outlined four general themes the new program will address. IODP involves 24 nations and utilizes different ocean drilling platforms that complement each other in drilling in different environments in the oceans.
Ocean Drilling Program: Science Operator
: www.odplegacy.org Integrated Ocean Drilling Program (IODP): www.iodp.org IODP U.S. Implementing Organization (IODP -USIO): www.iodp-usio.org The Ocean Drilling Program (ODP) was funded by the U.S. National Science Foundation and 22 international partners (JOIDES) to conduct basic research into the history of the ocean
Federal Register 2010, 2011, 2012, 2013, 2014
2012-02-27
... Shell for the take of marine mammals incidental to offshore oil and gas exploratory drilling programs in... Mammals by Harassment Incidental to Conducting Exploratory Drilling Programs in the U.S. Beaufort and... take of marine mammals incidental to conducting offshore exploratory drilling programs in the U.S...
DOE Office of Scientific and Technical Information (OSTI.GOV)
TerraTek, A Schlumberger Company
2008-12-31
The two phase program addresses long-term developments in deep well and hard rock drilling. TerraTek believes that significant improvements in drilling deep hard rock will be obtained by applying ultra-high rotational speeds (greater than 10,000 rpm). The work includes a feasibility of concept research effort aimed at development that will ultimately result in the ability to reliably drill 'faster and deeper' possibly with smaller, more mobile rigs. The principle focus is on demonstration testing of diamond bits rotating at speeds in excess of 10,000 rpm to achieve high rate of penetration (ROP) rock cutting with substantially lower inputs of energymore » and loads. The significance of the 'ultra-high rotary speed drilling system' is the ability to drill into rock at very low weights on bit and possibly lower energy levels. The drilling and coring industry today does not practice this technology. The highest rotary speed systems in oil field and mining drilling and coring today run less than 10,000 rpm - usually well below 5,000 rpm. This document provides the progress through two phases of the program entitled 'Smaller Footprint Drilling System for Deep and Hard Rock Environments: Feasibility of Ultra-High-Speed Diamond Drilling' for the period starting 30 June 2003 and concluding 31 March 2009. The accomplishments of Phases 1 and 2 are summarized as follows: (1) TerraTek reviewed applicable literature and documentation and convened a project kick-off meeting with Industry Advisors in attendance (see Black and Judzis); (2) TerraTek designed and planned Phase I bench scale experiments (See Black and Judzis). Improvements were made to the loading mechanism and the rotational speed monitoring instrumentation. New drill bit designs were developed to provided a more consistent product with consistent performance. A test matrix for the final core bit testing program was completed; (3) TerraTek concluded small-scale cutting performance tests; (4) Analysis of Phase 1 data indicated that there is decreased specific energy as the rotational speed increases; (5) Technology transfer, as part of Phase 1, was accomplished with technical presentations to the industry (see Judzis, Boucher, McCammon, and Black); (6) TerraTek prepared a design concept for the high speed drilling test stand, which was planned around the proposed high speed mud motor concept. Alternative drives for the test stand were explored; a high speed hydraulic motor concept was finally used; (7) The high speed system was modified to accommodate larger drill bits than originally planned; (8) Prototype mud turbine motors and the high speed test stand were used to drive the drill bits at high speed; (9) Three different rock types were used during the testing: Sierra White granite, Crab Orchard sandstone, and Colton sandstone. The drill bits used included diamond impregnated bits, a polycrystalline diamond compact (PDC) bit, a thermally stable PDC (TSP) bit, and a hybrid TSP and natural diamond bit; and (10) The drill bits were run at rotary speeds up to 5500 rpm and weight on bit (WOB) to 8000 lbf. During Phase 2, the ROP as measured in depth of cut per bit revolution generally increased with increased WOB. The performance was mixed with increased rotary speed, with the depth cut with the impregnated drill bit generally increasing and the TSP and hybrid TSP drill bits generally decreasing. The ROP in ft/hr generally increased with all bits with increased WOB and rotary speed. The mechanical specific energy generally improved (decreased) with increased WOB and was mixed with increased rotary speed.« less
Robotic and Human-Tended Collaborative Drilling Automation for Subsurface Exploration
NASA Technical Reports Server (NTRS)
Glass, Brian; Cannon, Howard; Stoker, Carol; Davis, Kiel
2005-01-01
Future in-situ lunar/martian resource utilization and characterization, as well as the scientific search for life on Mars, will require access to the subsurface and hence drilling. Drilling on Earth is hard - an art form more than an engineering discipline. Human operators listen and feel drill string vibrations coming from kilometers underground. Abundant mass and energy make it possible for terrestrial drilling to employ brute-force approaches to failure recovery and system performance issues. Space drilling will require intelligent and autonomous systems for robotic exploration and to support human exploration. Eventual in-situ resource utilization will require deep drilling with probable human-tended operation of large-bore drills, but initial lunar subsurface exploration and near-term ISRU will be accomplished with lightweight, rover-deployable or standalone drills capable of penetrating a few tens of meters in depth. These lightweight exploration drills have a direct counterpart in terrestrial prospecting and ore-body location, and will be designed to operate either human-tended or automated. NASA and industry now are acquiring experience in developing and building low-mass automated planetary prototype drills to design and build a pre-flight lunar prototype targeted for 2011-12 flight opportunities. A successful system will include development of drilling hardware, and automated control software to operate it safely and effectively. This includes control of the drilling hardware, state estimation of both the hardware and the lithography being drilled and state of the hole, and potentially planning and scheduling software suitable for uncertain situations such as drilling. Given that Humans on the Moon or Mars are unlikely to be able to spend protracted EVA periods at a drill site, both human-tended and robotic access to planetary subsurfaces will require some degree of standalone, autonomous drilling capability. Human-robotic coordination will be important, either between a robotic drill and humans on Earth, or a human-tended drill and its visiting crew. The Mars Analog Rio Tinto Experiment (MARTE) is a current project that studies and simulates the remote science operations between an automated drill in Spain and a distant, distributed human science team. The Drilling Automation for Mars Exploration (DAME) project, by contrast: is developing and testing standalone automation at a lunar/martian impact crater analog site in Arctic Canada. The drill hardware in both projects is a hardened, evolved version of the Advanced Deep Drill (ADD) developed by Honeybee Robotics for the Mars Subsurface Program. The current ADD is capable of 20m, and the DAME project is developing diagnostic and executive software for hands-off surface operations of the evolved version of this drill. The current drill automation architecture being developed by NASA and tested in 2004-06 at analog sites in the Arctic and Spain will add downhole diagnosis of different strata, bit wear detection, and dynamic replanning capabilities when unexpected failures or drilling conditions are discovered in conjunction with simulated mission operations and remote science planning. The most important determinant of future 1unar and martian drilling automation and staffing requirements will be the actual performance of automated prototype drilling hardware systems in field trials in simulated mission operations. It is difficult to accurately predict the level of automation and human interaction that will be needed for a lunar-deployed drill without first having extensive experience with the robotic control of prototype drill systems under realistic analog field conditions. Drill-specific failure modes and software design flaws will become most apparent at this stage. DAME will develop and test drill automation software and hardware under stressful operating conditions during several planned field campaigns. Initial results from summer 2004 tests show seven identifi distinct failure modes of the drill: cuttings-removal issues with low-power drilling into permafrost, and successful steps at executive control and initial automation.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
The Rawlins Test 2, UCG/SDB Master Well Drilling and Well Completion Plan consists of two separate reports. Part 1 consists of the Process Well Drilling and Completion Plan (Version D). This program was accomplished during the Fall 1980 drilling campaign. Four of the HFEM wells described in Part 2 were also drilled during that campaign due to early completion of the process well drilling. General program objectives are stated in this report. Part 2 consists of the Instrument Well Drilling and Completion Plan (Version B). This program is presently being accomplished in the Spring 1981 drilling campaign. Due to manymore » changes in the types, numbers and locations of the instrument wells it was written in a more general fashion to retain flexibility in the plan. The only significant changes to date from the plan are that the four HFEM wells completed during Fall 1980 were completed with 92' of Fiberglass at the bottom instead of the 210' now specified.« less
Reinforcement and Drill by Microcomputer.
ERIC Educational Resources Information Center
Balajthy, Ernest
1984-01-01
Points out why drill work has a role in the language arts classroom, explores the possibilities of using a microcomputer to give children drill work, and discusses the characteristics of a good software program, along with faults found in many software programs. (FL)
Historical methane hydrate project review
Collett, Timothy; Bahk, Jang-Jun; Frye, Matt; Goldberg, Dave; Husebo, Jarle; Koh, Carolyn; Malone, Mitch; Shipp, Craig; Torres, Marta
2013-01-01
In 1995, U.S. Geological Survey made the first systematic assessment of the volume of natural gas stored in the hydrate accumulations of the United States. That study, along with numerous other studies, has shown that the amount of gas stored as methane hydrates in the world greatly exceeds the volume of known conventional gas resources. However, gas hydrates represent both a scientific and technical challenge and much remains to be learned about their characteristics and occurrence in nature. Methane hydrate research in recent years has mostly focused on: (1) documenting the geologic parameters that control the occurrence and stability of gas hydrates in nature, (2) assessing the volume of natural gas stored within various gas hydrate accumulations, (3) analyzing the production response and characteristics of methane hydrates, (4) identifying and predicting natural and induced environmental and climate impacts of natural gas hydrates, and (5) analyzing the effects of methane hydrate on drilling safety.Methane hydrates are naturally occurring crystalline substances composed of water and gas, in which a solid water-‐lattice holds gas molecules in a cage-‐like structure. The gas and water becomes a solid under specific temperature and pressure conditions within the Earth, called the hydrate stability zone. Other factors that control the presence of methane hydrate in nature include the source of the gas included within the hydrates, the physical and chemical controls on the migration of gas with a sedimentary basin containing methane hydrates, the availability of the water also included in the hydrate structure, and the presence of a suitable host sediment or “reservoir”. The geologic controls on the occurrence of gas hydrates have become collectively known as the “methane hydrate petroleum system”, which has become the focus of numerous hydrate research programs.Recognizing the importance of methane hydrate research and the need for a coordinated effort, the U.S. Congress enacted Public Law 106-‐193, the Methane Hydrate Research and Development Act of 2000. This Act called for the Secretary of Energy to begin a methane hydrate research and development program in consultation with other U.S. federal agencies. At the same time a new methane hydrate research program had been launched in Japan by the Ministry of International Trade and Industry to develop plans for a methane hydrate exploratory drilling project in the Nankai Trough. Since this early start we have seen other countries including India, China, Canada, and the Republic of Korea establish large gas hydrate research and development programs. These national led efforts have also included the investment in a long list of important scientific research drilling expeditions and production test studies that have provided a wealth of information on the occurrence of methane hydrate in nature. The most notable expeditions and projects have including the following:-‐Ocean Drilling Program Leg 164 (1995)-‐Japan Nankai Trough Project (1999-‐2000)-‐Ocean Drilling Program Leg 204 (2004)-‐Japan Tokai-‐oki to Kumano-‐nada Project (2004)-‐Gulf of Mexico JIP Leg I (2005)-‐Integrated Ocean Drilling Program Expedition 311 (2005)-‐Malaysia Gumusut-‐Kakap Project (2006)-‐India NGHP Expedition 01 (2006)-‐China GMGS Expedition 01 (2007)-‐Republic of Korea UBGH Expedition 01 (2007)-‐Gulf of Mexico JIP Leg II (2009)-‐Republic of Korea UBGH Expedition 02 (2010)-‐MH-‐21 Nankai Trough Pre-‐Production Expedition (2012-‐2013)-‐Mallik Gas Hydrate Testing Projects (1998/2002/2007-‐2008)-‐Alaska Mount Elbert Stratigraphic Test Well (2007)-‐Alaska Iġnik Sikumi Methane Hydrate Production Test Well (2011-‐2012)Research coring and seismic programs carried out by the Ocean Drilling Program (ODP) and Integrated Ocean Drilling Program (IODP), starting with the ODP Leg 164 drilling of the Blake Ridge in the Atlantic Ocean in 1995, have also contributed greatly to our understanding of the geologic controls on the formation, occurrence, and stability of gas hydrates in marine environments. For the most part methane hydrate research expeditions carried out by the ODP and IODP provided the foundation for our scientific understanding of gas hydrates. The methane hydrate research efforts under ODP-‐IODP have mostly dealt with the assessment of the geologic controls on the occurrence of gas hydrate, with a specific goal to study the role methane hydrates may play in the global carbon cycle.Over the last 10 years, national led methane hydrate research programs, along with industry interest have led to the development and execution of major methane hydrate production field test programs. Two of the most important production field testing programs have been conducted at the Mallik site in the Mackenzie River Delta of Canada and in the Eileen methane hydrate accumulation on the North Slope of Alaska. Most recently we have also seen the completion of the world’s first marine methane hydrate production test in the Nankai Trough in the offshore of Japan. Industry interest in gas hydrates has also included important projects that have dealt with the assessment of geologic hazards associated with the presence of hydrates.The scientific drilling and associated coring, logging, and borehole monitoring technologies developed in the long list of methane hydrate related field studies are one of the most important developments and contributions associated with methane hydrate research and development activities. Methane hydrate drilling has been conducted from advanced scientific drilling platforms like the JOIDES Resolution and the D/V Chikyu, which feature highly advanced integrated core laboratories and borehole logging capabilities. Hydrate research drilling has also included the use of a wide array of industry, geotechnical and multi-‐service ships. All of which have been effectively used to collect invaluable geologic and engineering data on the occurrence of methane hydrates throughout the world. Technologies designed specifically for the collection and analysis of undisturbed methane hydrate samples have included the development of a host of pressure core systems and associated specialty laboratory apparatus. The study and use of both wireline conveyed and logging-‐while-‐drilling technologies have also contributed greatly to our understanding of the in-‐situ nature of hydrate-‐bearing sediments. Recent developments in borehole instrumentation specifically designed to monitor changes associated with hydrates in nature through time or to evaluate the response of hydrate accumulations to production have also contributed greatly to our understanding of the complex nature and evolution of methane hydrate systems.Our understanding of how methane hydrates occur and behave in nature is still growing and evolving – we do not yet know if methane hydrates can be economically produced, nor do we know fully the role of hydrates as an agent of climate change or as a geologic hazard. But it is known for certain that scientific drilling has contributed greatly to our understanding of hydrates in nature and will continue to be a critical source of the information to advance our understanding of methane hydrates.
43 CFR 3261.13 - What is a drilling program and how do I apply for drilling program approval?
Code of Federal Regulations, 2012 CFR
2012-10-01
... the well; (3) If you plan to directionally drill your well, also send us: (i) The proposed bottom hole... reservoir temperature and pressure; (11) Anticipated temperature gradient in the area; (12) A plat certified...
43 CFR 3261.13 - What is a drilling program and how do I apply for drilling program approval?
Code of Federal Regulations, 2011 CFR
2011-10-01
... the well; (3) If you plan to directionally drill your well, also send us: (i) The proposed bottom hole... reservoir temperature and pressure; (11) Anticipated temperature gradient in the area; (12) A plat certified...
43 CFR 3261.13 - What is a drilling program and how do I apply for drilling program approval?
Code of Federal Regulations, 2013 CFR
2013-10-01
... the well; (3) If you plan to directionally drill your well, also send us: (i) The proposed bottom hole... reservoir temperature and pressure; (11) Anticipated temperature gradient in the area; (12) A plat certified...
43 CFR 3261.13 - What is a drilling program and how do I apply for drilling program approval?
Code of Federal Regulations, 2014 CFR
2014-10-01
... the well; (3) If you plan to directionally drill your well, also send us: (i) The proposed bottom hole... reservoir temperature and pressure; (11) Anticipated temperature gradient in the area; (12) A plat certified...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Gordon Tibbitts; Arnis Judzis
2001-04-01
This document details the progress to date on the OPTIMIZATION OF MUD HAMMER DRILLING PERFORMANCE -- A PROGRAM TO BENCHMARK THE VIABILITY OF ADVANCED MUD HAMMER DRILLING contract for the quarter starting January 2001 through March 2001. Accomplishments to date include the following: (1) On January 9th of 2001, details of the Mud Hammer Drilling Performance Testing Project were presented at a ''kick-off'' meeting held in Morgantown. (2) A preliminary test program was formulated and prepared for presentation at a meeting of the advisory board in Houston on the 8th of February. (3) The meeting was held with the advisorymore » board reviewing the test program in detail. (4) Consensus was achieved and the approved test program was initiated after thorough discussion. (5) This new program outlined the details of the drilling tests as well as scheduling the test program for the weeks of 14th and 21st of May 2001. (6) All the tasks were initiated for a completion to coincide with the test schedule. (7) By the end of March the hardware had been designed and the majority was either being fabricated or completed. (8) The rock was received and cored into cylinders.« less
NASA Astrophysics Data System (ADS)
DeBlois, Elisabeth M.; Paine, Michael D.; Kilgour, Bruce W.; Tracy, Ellen; Crowley, Roger D.; Williams, Urban P.; Janes, G. Gregory
2014-12-01
This paper describes sediment composition at the Terra Nova offshore oil development. The Terra Nova Field is located on the Grand Banks approximately 350 km southeast of Newfoundland, Canada, at an approximate water depth of 100 m. Surface sediment samples (upper 3 cm) were collected for chemical and particle size analyses at the site pre-development (1997) and in 2000-2002, 2004, 2006, 2008 and 2010. Approximately 50 stations have been sampled in each program year, with stations extending from less than 1 km to a maximum of 20 km from source (drill centres) along five gradients, extending to the southeast, southwest, northeast, northwest and east of Terra Nova. Results show that Terra Nova sediments were contaminated with >C10-C21 hydrocarbons and barium-the two main constituents of synthetic-based drilling muds used at the site. Highest levels of contamination occurred within 1 to 2 km from source, consistent with predictions from drill cuttings dispersion modelling. The strength of distance gradients for >C10-C21 hydrocarbons and barium, and overall levels, generally increased as drilling progressed but decreased from 2006 to 2010, coincident with a reduction in drilling. As seen at other offshore oil development sites, metals other than barium, sulphur and sulphide levels were elevated and sediment fines content was higher in the immediate vicinity (less than 0.5 km) of drill centres in some sampling years; but there was no strong evidence of project-related alterations of these variables. Overall, sediment contamination at Terra Nova was spatially limited and only the two major constituents of synthetic-based drilling muds used at the site, >C10-C21 hydrocarbons and barium, showed clear evidence of project-related alternations.
Test drilling in the upper Sevier River drainage basin, Garfield and Piute Counties, Utah
Feltis, R.D.; Robinson, G.B. Jr.
1963-01-01
A test-drilling program was conducted by the U.S. Geological Survey in the upper Sevier River drainage basin (fig. 1) in the summer of 1962. The program was part of a ground-water investigation made in cooperation with the Utah State Engineer. The drilling was financed cooperatively through the State Engineer by the U.S. Geological Survey, Garfield, Piute, Sevier, Sanpete, and Millard Counties, and various water users within those counties. Drilling began in May and continued through September 1962, and 21 test holes were drilled.
Advanced composite aileron for L-1011 transport aircraft: Aileron manufacture
NASA Technical Reports Server (NTRS)
Dunning, E. G.; Cobbs, W. L.; Legg, R. L.
1981-01-01
The fabrication activities of the Advanced Composite Aileron (ACA) program are discussed. These activities included detail fabrication, manufacturing development, assembly, repair and quality assurance. Five ship sets of ailerons were manufactured. The detail fabrication effort of ribs, spar and covers was accomplished on male tools to a common cure cycle. Graphite epoxy tape and fabric and syntactic epoxy materials were utilized in the fabrication. The ribs and spar were net cured and required no post cure trim. Material inconsistencies resulted in manufacturing development of the front spar during the production effort. The assembly effort was accomplished in subassembly and assembly fixtures. The manual drilling system utilized a dagger type drill in a hydraulic feed control hand drill. Coupon testing for each detail was done.
Drill user's manual. [drilling machine automation
NASA Technical Reports Server (NTRS)
Pitts, E. A.
1976-01-01
Instructions are given for using the DRILL computer program which converts data contained in an Interactive Computer Graphics System (IGDS) design file to production of a paper tape for driving a numerically controlled drilling machine.
40 CFR 147.950 - State-administered program.
Code of Federal Regulations, 2014 CFR
2014-07-01
..., 1985 and January 20, 1986; (3)(i) Statewide Order Governing the Drilling for and Producing of Oil and... of Drilling Mud and Salt Water Generated from Drilling and Production of Oil and Gas Wells... 40 Protection of Environment 23 2014-07-01 2014-07-01 false State-administered program. 147.950...
40 CFR 147.950 - State-administered program.
Code of Federal Regulations, 2010 CFR
2010-07-01
..., 1985 and January 20, 1986; (3)(i) Statewide Order Governing the Drilling for and Producing of Oil and... of Drilling Mud and Salt Water Generated from Drilling and Production of Oil and Gas Wells... 40 Protection of Environment 22 2010-07-01 2010-07-01 false State-administered program. 147.950...
40 CFR 147.950 - State-administered program.
Code of Federal Regulations, 2013 CFR
2013-07-01
..., 1985 and January 20, 1986; (3)(i) Statewide Order Governing the Drilling for and Producing of Oil and... of Drilling Mud and Salt Water Generated from Drilling and Production of Oil and Gas Wells... 40 Protection of Environment 24 2013-07-01 2013-07-01 false State-administered program. 147.950...
40 CFR 147.950 - State-administered program.
Code of Federal Regulations, 2011 CFR
2011-07-01
..., 1985 and January 20, 1986; (3)(i) Statewide Order Governing the Drilling for and Producing of Oil and... of Drilling Mud and Salt Water Generated from Drilling and Production of Oil and Gas Wells... 40 Protection of Environment 23 2011-07-01 2011-07-01 false State-administered program. 147.950...
40 CFR 147.950 - State-administered program.
Code of Federal Regulations, 2012 CFR
2012-07-01
..., 1985 and January 20, 1986; (3)(i) Statewide Order Governing the Drilling for and Producing of Oil and... of Drilling Mud and Salt Water Generated from Drilling and Production of Oil and Gas Wells... 40 Protection of Environment 24 2012-07-01 2012-07-01 false State-administered program. 147.950...
An interactive drilling simulator for teaching and research
DOE Office of Scientific and Technical Information (OSTI.GOV)
Cooper, G.A.; Cooper, A.G.; Bihn, G.
1995-12-31
An interactive program has been constructed that allows a student or engineer to simulate the drilling of an oil well, and to optimize the drilling process by comparing different drilling plans. The program operates in a very user-friendly way, with emphasis on menu and button-driven commands. The simulator may be run either as a training program, with exercises that illustrate various features of the drilling process, as a game, in which a student is set a challenge to drill a well with minimum cost or time under constraints set by an instructor, or as a simulator of a real situationmore » to investigate the merit of different drilling strategies. It has three main parts, a Lithology Editor, a Settings Editor and the simulation program itself. The Lithology Editor allows the student, instructor or engineer to build a real or imaginary sequence of rock layers, each characterized by its mineralogy, drilling and log responses. The Settings Editor allows the definition of all the operational parameters, ranging from the drilling and wear rates of particular bits in specified rocks to the costs of different procedures. The simulator itself contains an algorithm that determines rate of penetration and rate of wear of the bit as drilling continues. It also determines whether the well kicks or fractures, and assigns various other {open_quotes}accident{close_quotes} conditions. During operation, a depth vs. time curve is displayed, together with a {open_quotes}mud log{close_quotes} showing the rock layers penetrated. If desired, the well may be {open_quotes}logged{close_quotes} casings may be set and pore and fracture pressure gradients may be displayed. During drilling, the total time and cost are shown, together with cost per foot in total and for the current bit run.« less
NASA Astrophysics Data System (ADS)
Richman, Barbara T.
The Sedco/BP 471, owned jointly by Sedco, Inc., of Dallas, Tex., and British Petroleum, has been selected as the drill ship for the Ocean Drilling Program (ODP). The contract, with a specified initial term of 4 years with 10 1-year options after that, is expected to be signed by mid March by Texas A&M University, the ODP science operator, and Sedco, Inc. Texas A&M will develop the design for scientific and laboratory spaces aboard the Sedco/BP 471 and will oversee the ship conversion. Testing and shakedown of the ship is scheduled for the coming autumn; the first scientific cruise is scheduled for next January.One year ago, the commercial drilling market sagged, opening up the option for leasing a commercial drill ship (Eos, February 22, 1983, p. 73). Previously, the ship of choice had been the Glomar Explorer; rehabilitating the former CIA salvage ship would have been extremely expensive, however.
Design and Implementation of Multifunctional Automatic Drilling End Effector
NASA Astrophysics Data System (ADS)
Wang, Zhanxi; Qin, Xiansheng; Bai, Jing; Tan, Xiaoqun; Li, Jing
2017-03-01
In order to realize the automatic drilling in aircraft assembly, a drilling end effector is designed by integrating the pressure unit, drilling unit, measurement unit, control system and frame structure. In order to reduce the hole deviation, this paper proposes a vertical normal adjustment program based on 4 laser distance sensors. The actual normal direction of workpiece surface can be calculated through the sensors measurements, and then robot posture is adjusted to realize the hole deviation correction. A base detection method is proposed to detect and locate the hole automatically by using the camera and the reference hole. The experiment results show that the position accuracy of the system is less than 0.3mm, and the normal precision is less than 0.5°. The drilling end effector and robot can greatly improve the efficiency of the aircraft parts and assembly quality, and reduce the product development cycle.
Strategies of Computer-Based Instructional Design: A Review of Guidelines and Empirical Research
1990-05-01
tutorial or information-oriented lesson, a flashcard -type drill, or a simulation or game. 6 Guidelines. Instructional designers must decide whether...amount of inter- activity and feedback. An information-only program presented textual material without any questions. A flashcard -type drill program...educational game program was identical to the flashcard -type drill, except feedback was provided for responses. Results showed no differences in posttest
Subsurface Sample Acquisition and Transfer Systems (SSATS)
NASA Astrophysics Data System (ADS)
Rafeek, S.; Gorevan, S. P.; Kong, K. Y.
2001-01-01
In the exploration of planets and small bodies, scientists will need the services of a deep drilling and material handling system to not only obtain the samples necessary for analyses but also to precisely transfer and deposit those samples in in-situ instruments on board a landed craft or rover. The technology for such a deep sampling system as the SSATS is currently been developed by Honeybee Robotics through a PIDDP effort. The SSATS has its foundation in a one-meter prototype (SATM) drill that was developed under the New Millenium Program for ST4/Champollion. Additionally the SSATS includes relevant coring technology form a coring drill (Athena Mini-Corer) developed for the Mars Sample Return Mission. These highly developed technologies along with the current PIDDP effort, is combined to produce a sampling system that can acquire and transfer samples from various depths. Additional information is contained in the original extended abstract.
Continental Scientific Drilling Program Data Base
NASA Astrophysics Data System (ADS)
Pawloski, Gayle
The Continental Scientific Drilling Program (CSDP) data base at Lawrence Livermore National Laboratory is a central repository, cataloguing information from United States drill holes. Most holes have been drilled or proposed by various federal agencies. Some holes have been commercially funded. This data base is funded by the Office of Basic Energy Sciences of t he Department of Energy (OBES/DOE) to serve the entire scientific community. Through the unrestricted use of the database, it is possible to reduce drilling costs and maximize the scientific value of current and planned efforts of federal agencies and industry by offering the opportunity for add-on experiments and supplementing knowledge with additional information from existing drill holes.
Federal Register 2010, 2011, 2012, 2013, 2014
2011-01-24
... Drilling Programs in the Chukchi and Beaufort Seas, AK AGENCY: National Marine Fisheries Service (NMFS... harassment, by Shell Offshore Inc. (Shell) incidental to offshore exploration drilling on Outer Continental... drilling programs in 2010. ADDRESSES: The applications related to this action are available by writing to...
Using Deep-Sea Scientific Drilling to Enhance Ocean Science Literacy
NASA Astrophysics Data System (ADS)
Passow, Michael; Cooper, Sharon; Kurtz, Nicole; Burgio, Marion; Cicconi, Alessia
2017-04-01
Beginning with confirmation of sea floor spreading in Leg 3 of the Deep Sea Drilling Project in 1968, scientific ocean drilling has provided much of the evidence supporting modern understanding of the Earth System, global climate changes, and many other important concepts. But for more than three decades, results of discoveries were published primarily in scientific journals and cruise volumes. On occasion, science journalists would write articles for the general public, but organized educational outreach efforts were rare. Starting about a decade ago, educators were included in the scientific party aboard the JOIDES Resolution. These "teachers-at-sea" developed formats to translate the technical and scientific activities into language understandable to students, teachers, and the public. Several "Schools of Rock" have enabled groups of teachers and informal science educators to experience what happens aboard the JOIDES Resolution. Over the past few years, educational outreach efforts based on scientific drilling expanded to create a large body of resources that promote Ocean Science Literacy. Partnerships between scientists and educators have produced a searchable database of inquiry-centered classroom and informal science activities. These are available for free through the JOIDES Resolution website, joidesresolution.org. Activities are aligned with the Ocean Literacy Principles (http://oceanliteracy.wp2.coexploration.org/) and Science Education Standards. In addition to a suite of lessons based on the science behind scientific drilling, participants have developed a range of educational resources that include graphic novels ("Tales of the Resolution" (http://joidesresolution.org/node/263) ; children's books ("Uncovering Earth's Secrets" and "Where the Wild Microbes Grow" http://joidesresolution.org/node/2998); posters, videos, and other materials. Cooper and Kurtz are currently overseeing improvements and revisions to the JR education website pages. The International Ocean Discovery Program continues to offer annual School of Rock professional development workshops to which educators can apply for participation. During these all-expense paid experiences, they learn about IODP science and develop new activities for their audiences. Cicconi and Passow will describe their experiences during some of these programs. European teachers have also participated in "teacher-at-sea" programs sponsored by ECORD aboard the JOIDES Resolution. Burgio participated in Expedition 360 from December 2015 to the end of January 2016 (http://joidesresolution.org/node/4253). This cruise focused on the global effort to drill to the Moho through the Southwest Indian Ridge. As they drilled down to the Moho, scientists obtained new discoveries about life in the crust, interactions between water and rocks, and magmatic processes that build the oceanic crust at very slow spreading ridges. The Education Officers team used a panel of strategies to communicate during the efforts during their two months onboard. She used social media and live-streaming to share the last discoveries about the oceanic crust with students all over the world. Additional materials have been created by teachers and other non-science participants from many countries across the globe. Educational outreach programs associated with scientific ocean drilling provide effective opportunities to enhance Ocean Science Literacy.
Building an open-source robotic stereotaxic instrument.
Coffey, Kevin R; Barker, David J; Ma, Sisi; West, Mark O
2013-10-29
This protocol includes the designs and software necessary to upgrade an existing stereotaxic instrument to a robotic (CNC) stereotaxic instrument for around $1,000 (excluding a drill), using industry standard stepper motors and CNC controlling software. Each axis has variable speed control and may be operated simultaneously or independently. The robot's flexibility and open coding system (g-code) make it capable of performing custom tasks that are not supported by commercial systems. Its applications include, but are not limited to, drilling holes, sharp edge craniotomies, skull thinning, and lowering electrodes or cannula. In order to expedite the writing of g-coding for simple surgeries, we have developed custom scripts that allow individuals to design a surgery with no knowledge of programming. However, for users to get the most out of the motorized stereotax, it would be beneficial to be knowledgeable in mathematical programming and G-Coding (simple programming for CNC machining). The recommended drill speed is greater than 40,000 rpm. The stepper motor resolution is 1.8°/Step, geared to 0.346°/Step. A standard stereotax has a resolution of 2.88 μm/step. The maximum recommended cutting speed is 500 μm/sec. The maximum recommended jogging speed is 3,500 μm/sec. The maximum recommended drill bit size is HP 2.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Fabain, R.T.
1994-05-16
A rock strength analysis program, through intensive log analysis, can quantify rock hardness in terms of confined compressive strength to identify intervals suited for drilling with polycrystalline diamond compact (PDC) bits. Additionally, knowing the confined compressive strength helps determine the optimum PDC bit for the intervals. Computing rock strength as confined compressive strength can more accurately characterize a rock's actual hardness downhole than other methods. the information can be used to improve bit selections and to help adjust drilling parameters to reduce drilling costs. Empirical data compiled from numerous field strength analyses have provided a guide to selecting PDC drillmore » bits. A computer analysis program has been developed to aid in PDC bit selection. The program more accurately defines rock hardness in terms of confined strength, which approximates the in situ rock hardness downhole. Unconfined compressive strength is rock hardness at atmospheric pressure. The program uses sonic and gamma ray logs as well as numerous input data from mud logs. Within the range of lithologies for which the program is valid, rock hardness can be determine with improved accuracy. The program's output is typically graphed in a log format displaying raw data traces from well logs, computer-interpreted lithology, the calculated values of confined compressive strength, and various optional rock mechanic outputs.« less
A Mentoring Program Drills down on the Common Core
ERIC Educational Resources Information Center
Davis, Emily; Sinclair, Steve; Gschwend, Laura
2015-01-01
The Santa Cruz/Silicon Valley New Teacher Project--under the aegis of the New Teacher Center--devised a program to train teacher mentors to help new teachers incorporate the Common Core standards into their teaching. The three-year program yielded five critical lessons: Mentors need ongoing support to develop their readiness and willingness to…
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1991-08-01
This paper reports that Major activity in 1990 was Israel National Oil Co.'s startup in November of a $30 million exploratory drilling program near the Dead Sea. Isramco's deep Yam 2 offshore wildcat was apparently suspended after gas shows and mechanical problems. In 1990, the Negev venture 2, led by Isramco, acquired an additional one million-acre offshore exploration license between Ashdod (offshore from which Yam 2 was sited) and Haifa. The group plans a $40-million three-well program. Drilling last year totaled four wells and 31,114 ft of hole. Included were one oil well extension and three dry holes. This year,more » eight onshore wildcats and two development wells, plus one offshore wildcat are expected to be drilled. Production averaged only 248 bopd and 3.2 MMcfgd in 1990. Reserves are estimated at 1.3 million bbl of oil and 6.8 bcfg.« less
NASA Technical Reports Server (NTRS)
1981-01-01
Portable self-contained drill capable of extracting core samples as much as 10 feet below the surface was needed for the astronauts. Black & Decker used a specially developed computer program to optimize the design of the drill's motor and insure minimal power consumption. Refinement of the original technology led to the development of a cordless miniature vacuum cleaner called the Dustbuster. It has no hose, no cord, is 14 inches long, and also comes with a storage bracket that also serves as a recharger; plugs into a home outlet that charges the nickel cadmium batteries when not in use. Other home use cordless instruments include drills, shrub trimmers and grass shears. Company also manufactures a number of cordless tools used in the sheet metal automobile and construction industries, and a line of cordless orthopedic instruments.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Quam, S.
The Nigerian National Petroleum Corporation/Chevron Nigeria Limited joint venture has been acquiring three-dimensional (3-D) seismic data over its concessions since 1984. To date, 1700 km[sup 2] have been recorded and processed at a cumulative cost of US $39 million. During 1991 - 1992, 20 development wells were drilled based directly on new 3-D seismic interpretations. These wells have added 148 million bbl of oil in new recoverable reserves, and to date have added 37,000 bbl/day to the joint venture's production. In addition, the 3-D interpretations have resulted in a sizable inventory of wells for future development drilling. The new 3-Dmore » interpretations provided more accurate pictures of fault patterns, fluid contacts, channel trends, stratigraphic continuity, and velocity/amplitude anomalies. In addition, the 3-D data were invaluable in designing low risk, directional well trajectories to tap relatively thin oil legs under large gas caps. Wells often were programmed to hit several objectives at their respective gas/oil contacts, resulting in maximized net oil sand pays and reducing the risk of gas production. In order to do this, directional [open quotes]sharpshooting,[close quotes] accurate depth conversion of the seismic time maps, was critical. By using the 3-D seismic, checkshot, and sonic data to develop a variable velocity space, well-top prognoses within 50 ft at depths of 6,000-10,000 ft were possible, and were key to the success of the program. As the joint venture acreage becomes more mature, development wells will be drilled for smaller numbers of stacked objectives, and sometimes for single sands. Highly accurate 3-D interpretations and depth conversions will become even more critical in order to tap thinner pay zones in a cost-effect manner.« less
Ocean Drilling Program: Privacy Policy
and products Drilling services and tools Online Janus database Search the ODP/TAMU web site ODP's main web site ODP/TAMU Science Operator Home Ocean Drilling Program Privacy Policy The following is the privacy policy for the www-odp.tamu.edu web site. 1. Cookies are used in the Database portion of the web
ICDP drilling in the Scandinavian Caledonides: the SDDP-COSC project
NASA Astrophysics Data System (ADS)
Lorenz, Henning; Juhlin, Christopher; Gee, David; Pascal, Christophe; Tsang, Chin-Fu; Pedersen, Karsten; Rosberg, Jan-Erik
2013-04-01
The Swedish Deep Drilling Program (SDDP) Collisional Orogeny in the Scandinavian Caledonides (COSC) project is a multidisciplinary investigation of the Scandian mountain belt. Cenozoic uplift of the Scandes has exposed a lower- to middle-crustal level section through this Himalaya-type orogen, providing unique opportunities to better understand not only the Caledonides, but also on-going orogeny and the earthquake-prone environments of modern mountains belts. COSC will also contribute to our knowledge of mountain belt hydrology, provide the first information about deep thermal gradients for paleoclimate modeling and potential geothermal energy resources, contribute new information about the deep biosphere, and improve our understanding of the Cenozoic uplift history of the Scandes. The drilling program targets the far-traveled (> 400 km) allochthons of the Scandinavian Caledonides and their emplacement across the Baltoscandian foreland basin onto the platform of continent Baltica. Two 2.5 km deep holes are planned. COSC-1, to be drilled in the summer of 2013, will target the high-grade metamorphic complex of the Seve Nappes (SNC) and its contact to underlying allochthons. COSC-2 will start in the lower thrust sheets, pass through the basal décollement and investigate the character of the deformation in the underlying basement. An international science team, including expertise on Himalaya-Tibet and other young orogens, is running the science program. New high-resolution reflection seismic data provide excellent images of the upper crust. Alternative interpretations of the reflectors' origin, particularly those in the basement, will be tested. The site of COSC-1 is based on a 3D geological model, constructed from surface geology, recent and vintage regional reflection seismic profiles, regional and local gravity data, and high-resolution aeromagnetics, acquired recently by the Geological Survey of Sweden. The drilling will be carried out utilising the new Swedish scientific drilling infrastructure, located at Lund University, an Atlas Copco CT20 diamond core-drilling rig, with versatile drilling equipment (see EGU2012-7379), providing the ideal platform for core-drilling to 2.5 km depths. Existing drilling, sampling and testing techniques (e.g. triple-tube core drilling for best core quality) will need to be adapted to highly variable lithologies and new techniques will be developed, as necessary. COSC-1 drilling operations and the directly related on-site investigations are financed by ICDP and the Swedish Research Council. All drill cores will be transferred to the core repository of the Geological Survey of Sweden, and a sampling party will be announced later this year. Researchers who want to participate in COSC and contribute their expertise are encouraged to inform us of their interests.
Oil exploration and development in Marib/Al Jawf basin, Yemen Arab Republic
DOE Office of Scientific and Technical Information (OSTI.GOV)
Maycock, I.D.
1986-07-01
In 1981, Yemen Hunt Oil Company (YHOC) negotiated a production-sharing agreement covering 12,600 km/sup 2/ in the northeast part of the Yemen Arab Republic. A reconnaissance seismic program of 1864 km acquired in 1982 revealed the presence of a major half graben, designated the Marib/Al Jawf basin by YHOC. A sedimentary section up to 18,000 ft thick has been recognized. Geologic field mapping identified Jurassic carbonates covered by Cretaceous sands overlying Permian glaciolacustrine sediments, Paleozoic sandstones, or Precambrian basement. The first well drilled in 1984, aimed at a possible Jurassic carbonate objective, encountered hydrocarbon-bearing sands in the Jurassic-Cretaceous transition betweenmore » 5000 and 6000 ft. A successful appraisal drilling program has demonstrated satisfactory lateral reservoir continuity. Further wildcat drilling demonstrates macro-unit correlation within the eastern part of the basin. Rapid basin development apparently commenced in the late Kimmeridgian, culminating with the deposition of Tithonian evaporites. Available geochemical analysis indicates sourcing from restricted-basin sediments. Excellent traps, reservoirs, and source beds underlying the Tithonian evaporites indicate that a significant new petroliferous province is present.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
Gulf Research and Development Company is implementing a DOE-sponsored Underground Coal Gasification project in Steeply Dipping Coal Beds (UCG/SDB) in order to assess the economic and technical viability of UCG in SDB. In the Fall 1980 drilling program, 2 vertical and 2 slant process wells; 3 hydrologic and 1 exploratory well and 4 HFEM wells were completed. The Spring, 1981 program will consist of drilling the remaining instrumentation wells necessary to track the progress of the underground reactor in real time. These will consist of: 6 additional High Frequency Electromagnetic wells (HFEM) and 3 extensometer wells (X). These wells willmore » be installed vertically with an expected deviation of two degrees or less.« less
Salton Sea Scientific Drilling Program
Sass, J.H.
1988-01-01
The Salton Sea Scientific Drilling Program (SSSDP) was the first large-scale drilling project undertaken by the U.S Continental Scientific Drilling Program. The objectives of the SSSDP were (1) to drill a deep well into the Salton Sea Geothermal Field in the Imperial Valley of California, (2) to retrieve a high percentage of core and cuttings along the entire depth of the well, (3) to obtain a comprehensive suite of geophysical logs, (4) to conduct flow tests at two depths (and to take fluid samples therefrom), and (5) to carry out several downhole experiments. These activites enabled the U.S Geological Survey and cooperating agencies to study the physical and chemical processes involved in an active hydrothermal system driven by a molten-rock heat source. This program, orginally conceived by Wilfred A. Elders, professor of geology at the University of California at Riverside, was coordinated under an inter-agency accord among the Geological Survey, the U.S Department of Energy, and the National Science Foundation.
Probabilistic analysis algorithm for UA slope software program.
DOT National Transportation Integrated Search
2013-12-01
A reliability-based computational algorithm for using a single row and equally spaced drilled shafts to : stabilize an unstable slope has been developed in this research. The Monte-Carlo simulation (MCS) : technique was used in the previously develop...
Search Search Home SH Reference Manual E19 Documentation Program Management Training/Drills Other River and Lake Summary (RVD) SH Reference Manual, E-19 Docs, Program Management, Training/Drills, Other
DOE Office of Scientific and Technical Information (OSTI.GOV)
Gordon Tibbitts; Arnis Judzis
2002-07-01
This document details the progress to date on the OPTIMIZATION OF MUD HAMMER DRILLING PERFORMANCE -- A PROGRAM TO BENCHMARK THE VIABILITY OF ADVANCED MUD HAMMER DRILLING contract for the quarter starting April 2002 through June 2002. Even though we are awaiting the optimization portion of the testing program, accomplishments include the following: (1) Presentation material was provided to the DOE/NETL project manager (Dr. John Rogers) for the DOE exhibit at the 2002 Offshore Technology Conference. (2) Two meeting at Smith International and one at Andergauge in Houston were held to investigate their interest in joining the Mud Hammer Performancemore » study. (3) SDS Digger Tools (Task 3 Benchmarking participant) apparently has not negotiated a commercial deal with Halliburton on the supply of fluid hammers to the oil and gas business. (4) TerraTek is awaiting progress by Novatek (a DOE contractor) on the redesign and development of their next hammer tool. Their delay will require an extension to TerraTek's contracted program. (5) Smith International has sufficient interest in the program to start engineering and chroming of collars for testing at TerraTek. (6) Shell's Brian Tarr has agreed to join the Industry Advisory Group for the DOE project. The addition of Brian Tarr is welcomed as he has numerous years of experience with the Novatek tool and was involved in the early tests in Europe while with Mobil Oil. (7) Conoco's field trial of the Smith fluid hammer for an application in Vietnam was organized and has contributed to the increased interest in their tool.« less
Groundwater Exploration for Rural Communities in Ghana, West Africa
NASA Astrophysics Data System (ADS)
McKay, W. A.
2001-05-01
Exploration for potable water in developing countries continues to be a major activity, as there are more than one billion people without access to safe drinking water. Exploration for groundwater becomes more critical in regions where groundwater movement and occurrence is controlled by secondary features such as fractures and faults. Drilling success rates in such geological settings are generally very low, but can be improved by integrating geological, hydrogeological, aerial photo interpretation with land-based geophysical technology in the selection of drilling sites. To help alleviate water supply problems in West Africa, the Conrad N. Hilton Foundation and other donors, since 1990, have funded the World Vision Ghana Rural Water Project (GRWP) to drill wells for potable water supplies in the Greater Afram Plains (GAP) of Ghana. During the first two years of the program, drilling success rates using traditional methods ranged from 35 to 80 percent, depending on the area. The average drilling success rate for the program was approximately 50 percent. In an effort to increase the efficiency of drilling operations, the Desert Research Institute evaluated and developed techniques for application to well-siting strategies in the GAP area of Ghana. A critical project element was developing technical capabilities of in-country staff to independently implement the new strategies. Simple cost-benefit relationships were then used to evaluate the economic advantages of developing water resources using advanced siting methods. The application of advanced methods in the GAP area reveal an increase of 10 to 15 percent in the success rate over traditional methods. Aerial photography has been found to be the most useful of the imagery products covering the GAP area. An effective approach to geophysical exploration for groundwater has been the combined use of EM and resistivity methods. Economic analyses showed that the use of advanced methods is cost-effective when success rates with traditional methods are less than 70 to 90 percent. Finally, with the focus of GRWP activities shifting to Ghana's northern regions, new challenges in drilling success rates are being encountered. In certain districts, success rates as low as 35 percent are observed, raising questions about the efficacy of existing well-siting strategies in the current physical setting, and the validity of traditional cost-benefit analyses for assessing the economic aspects of water exploration in drought-stricken areas.
The Mojave Subsurface Bio-Geochemistry Explorer (MOSBE)
NASA Technical Reports Server (NTRS)
Guerrero, J.; Beegle, L.; Abbey, W.; Bhartia, R.; Kounaves, S.; Russell, M.; Towles, D.
2012-01-01
The MOSBE Team has developed a terrestrial field campaign to explore two subsurface biological habitats under the Mojave Desert. This field campaign will not only help us understand terrestrial desert biology, but also will develop methodologies and strategies for potential future Mars missions that would seek to explore the Martian subsurface. We have proposed to the ASTEP program to integrate a suite of field demonstrated instruments with a 20 m subsurface drill as a coherent unit, the Mojave Subsurface Bio-geochemistry Explorer. The ATK Space Modular Planetary Drill System (MPDS) requires no drilling fluid, which allows aseptic sampling, can penetrate lithic ground up to 20 meters of depth, and utilizes less than 100 Watts throughout the entire depth. The drill has been developed and demonstrated in field testing to a depth of 10 meters in Arizona, December 2002. In addition to caching a continuous core throughout the drilling depth, it also generates and caches cuttings and fines that are strata-graphically correlated with the core. As a core segment is brought to the surface, it will be analyzed for texture and structure by a color microscopic imager and for relevant chemistry and mineralogy with a UV fluorescence/Raman spectrometer. Organic and soluble ionic species will be identified through two instruments -- a microcapillary electrophoresis, and an ion trap mass spectrometer that have been developed under PIDDP, ASTID and MIDP funding.
Horizontal technology helps spark Louisiana`s Austin chalk trend
DOE Office of Scientific and Technical Information (OSTI.GOV)
Koen, A.D.
1996-04-29
A handful of companies paced by some of the most active operators in the US are pressing the limits of horizontal technology to ramp up Cretaceous Austin chalk exploration and development (E and D) across Louisiana. Companies find applications in Louisiana for lessons learned drilling horizontal wells to produce chalk intervals in Texas in Giddings, Pearsall, and Brookeland fields. Continuing advances in horizontal well technology are helping operators deal with deeper, hotter reservoirs in more complex geological settings that typify the chalk in Louisiana. Better horizontal drilling, completion, formation evaluation, and stimulation techniques have enabled operators to produce oil andmore » gas from formations previously thought to be uneconomical. Most of the improved capabilities stem from better horizontal tools. Horizontal drilling breakthroughs include dual powered mud motors and retrievable whipstocks, key links in the ability to drill wells with more than one horizontal lateral. Better geosteering tools have enabled operators to maintain horizontal wellbores in desired intervals by signaling bit positions downhole while drilling. This paper reviews the technology and provides a historical perspective on the various drilling programs which have been completed in this trend. It also makes predictions on future drilling successes.« less
Results of the second phase of the drought-disaster test-drilling program near Morristown, N.J.
Vecchioli, John; Nichols, William D.; Nemickas, Bronius
1967-01-01
The continued drought in northeastern New Jersey through the summer of 1966 with its attendant water-supply problems resulted in an extension of the drought-disaster test-drilling program originally requested by the Office of Emergency Planning on August 30, 1965. Authorization to continue test drilling was fiven by the Office of Emergency Planning on September 26, 1966, with the stipulation that all field work be complete by January 31, 1977. Contractural costs were paid by the Office of Emergency Planning, whereas personnel costs were shared by the U.S. Geological Survey and the New Jersey Department of Conservation and Economic Development, Division of Water Policy and Supply.The work undertaken in 1965 by the Geological Survey was "...to preform the necessary drilling and testing of wells to identify the extent and nature of a reserve ground-water source in the vicinity of the Passaic River near the northern New Jersey metropolitan area." Results of this first phase were made available in the fall of 1966 in Water Resources Circular 16 of the New Jersey Department of Conservation and Economic Development. Three of the five areas tested (figure 1)--two in Parsippany-Troy Hills Township (areas 2 and 4) and one in East Hanover Township (area 1), Morris County--proved capable of providing an aggregate sustained yield of 7.5 million gallons daily (mgd) from wells constructed in sand and gravel deposits. Because significant supplies of ground water for emergency use were located in the first phase of the exploratory test-drilling program, it was though desirable to extend the originally planned studies so as to obtain maximum practicable information on emergency supplies.During this second phase of the investigation, drilling was conducted in 16 sites in Chatham, Madison, and Florham Park Boroughs and in Hanover and East Hanover Townships, Morris County. (See figure 2.) The drilling in Hanover and East Hanover Townships, and part of the drilling done in Florham Park was to explore the availability of large undeveloped ground-water supplies. Drilling in Chatham, Madison, and Florham Park Boroughs was done primarily to determine the extent and continuity of buried valley-fill aquifers, so that a full evaluation of the effects of pumpage from other areas on these already heavily pumped areas could be made. In addition, it was anticipated that the drilling could help in defining the feasibility of artificial recharge of the heavily pumped areas and in the determination of the prospective method of recharge and points of emplacement.Arrangements for easements with landowners, preparation of specifications for well drilling and seismic work, and supervision of well drilling and seismic contracts were all performed by the New Jersey District, Water Resources Division of the Geological Survey.Prior to the test drilling, seismic exploration under contract with Alpine Geophysical Associates of Norwood, N. J. was conducted at five locations in the Chatham-Madison-Florham Park area and at one place in Parsippany-Troy Hills Township. The seismic work was done to determine the most favorable location for a test well at several potential test-well sites and to help in the interpretation of subsurface geology between test sites.Contracts for the drilling of the test holes were awarded during November and drilling commences on November 30. Kaye Well drilling, Inc. of Jackson, N. J. was the recipient of a contract for eight of the test holes, and a second contract was awarded to Rinbrand Well Drilling Co., Inc. of Glen Rock, N. J.--also for eight test holes.Acknowledgment is due to the many public officials of Chatham, Madison, Florham Park, Morristown, and East Hanover Township as well as officials of the Braidburn Corporation and Esso Research and Engineering Co., who cooperated by making their lands available for exploration.
Johnson, Victoria A; Ronan, Kevin R; Johnston, David M; Peace, Robin
2016-11-01
A main weakness in the evaluation of disaster education programs for children is evaluators' propensity to judge program effectiveness based on changes in children's knowledge. Few studies have articulated an explicit program theory of how children's education would achieve desired outcomes and impacts related to disaster risk reduction in households and communities. This article describes the advantages of constructing program theory models for the purpose of evaluating disaster education programs for children. Following a review of some potential frameworks for program theory development, including the logic model, the program theory matrix, and the stage step model, the article provides working examples of these frameworks. The first example is the development of a program theory matrix used in an evaluation of ShakeOut, an earthquake drill practiced in two Washington State school districts. The model illustrates a theory of action; specifically, the effectiveness of school earthquake drills in preventing injuries and deaths during disasters. The second example is the development of a stage step model used for a process evaluation of What's the Plan Stan?, a voluntary teaching resource distributed to all New Zealand primary schools for curricular integration of disaster education. The model illustrates a theory of use; specifically, expanding the reach of disaster education for children through increased promotion of the resource. The process of developing the program theory models for the purpose of evaluation planning is discussed, as well as the advantages and shortcomings of the theory-based approaches. © 2015 Society for Risk Analysis.
2007-02-01
MPa and is constrained by calibrating the two electronic pressure gauges against a Heise gauge . Axial displacement during melt extraction is measured...105 (B 12), 28,411- 28,425, 2000. Cannat, M., et al., Proceedings of the Ocean Drilling Program, Initial Reports, Ocean Drilling Program, College...Kane transform zone (MARK), Proc. Ocean Drill . Program, Sci. Results, 153, 5-21, 1997. Karson, J.A., G. Thompson, S.E. Humphris, S.E. Edmond, J.M
Well-planning programs give students field-like experience
DOE Office of Scientific and Technical Information (OSTI.GOV)
Sifferman, T.R.; Chapman, L.
1983-01-01
The University of Tulsa recently was given a package of computer well planning and drilling programs that will enable petroleum engineering students to gain valuable experience in designing well programs while still in school. Comprehensive homework assignments are now given in areas of drilling fluids programing, hydraulics, directional wells and surveying. Additional programs are scheduled for next semester.
Influence of drilling operations on drilling mud gas monitoring during IODP Exp. 338 and 348
NASA Astrophysics Data System (ADS)
Hammerschmidt, Sebastian; Toczko, Sean; Kubo, Yusuke; Wiersberg, Thomas; Fuchida, Shigeshi; Kopf, Achim; Hirose, Takehiro; Saffer, Demian; Tobin, Harold; Expedition 348 Scientists, the
2014-05-01
The history of scientific ocean drilling has developed some new techniques and technologies for drilling science, dynamic positioning being one of the most famous. However, while industry has developed newer tools and techniques, only some of these have been used in scientific ocean drilling. The introduction of riser-drilling, which recirculates the drilling mud and returns to the platform solids and gases from the formation, to the International Ocean Drilling Program (IODP) through the launch of the Japan Agency of Marine Earth-Science and Technology (JAMSTEC) riser-drilling vessel D/V Chikyu, has made some of these techniques available to science. IODP Expedition 319 (NanTroSEIZE Stage 2: riser/riserless observatory) was the first such attempt, and among the tools and techniques used was drilling mud gas analysis. While industry regularly conducts drilling mud gas logging for safety concerns and reservoir evaluation, science is more interested in other components (e.g He, 222Rn) that are beyond the scope of typical mud logging services. Drilling mud gas logging simply examines the gases released into the drilling mud as part of the drilling process; the bit breaks and grinds the formation, releasing any trapped gases. These then circulate within the "closed circuit" mud-flow back to the drilling rig, where a degasser extracts these gases and passes them on to a dedicated mud gas logging unit. The unit contains gas chromatographs, mass spectrometers, spectral analyzers, radon gas analyzers, and a methane carbon isotope analyzer. Data are collected and stored in a database, together with several drilling parameters (rate of penetration, mud density, etc.). This initial attempt was further refined during IODP Expeditions 337 (Deep Coalbed Biosphere off Shimokita), 338 (NanTroSEIZE Stage 3: NanTroSEIZE Plate Boundary Deep Riser 2) and finally 348 (NanTroSEIZE Stage 3: NanTroSEIZE Plate Boundary Deep Riser 3). Although still in its development stage for scientific application, this technique can provide a valuable suite of measurements to complement more traditional IODP shipboard measurements. Here we present unpublished data from IODP Expeditions 338 and 348, penetrating the Nankai Accretionary wedge to 3058.5 meters below seafloor. Increasing mud density decreased degasser efficiency, especially for higher hydrocarbons. Blurring of the relative variations in total gas by depth was observed, and confirmed with comparison to headspace gas concentrations from the cored interval. Theoretically, overpressured zones in the formation can be identified through C2/C3 ratios, but these ratios are highly affected by changing drilling parameters. Proper mud gas evaluations will need to carefully consider the effects of variable drilling parameters when designing experiments and interpreting the data.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Gordon Tibbitts; Arnis Judzis
2001-10-01
This document details the progress to date on the OPTIMIZATION OF MUD HAMMER DRILLING PERFORMANCE -- A PROGRAM TO BENCHMARK THE VIABILITY OF ADVANCED MUD HAMMER DRILLING contract for the quarter starting July 2001 through September 2001. Accomplishments to date include the following: TerraTek highlighted DOE's National Energy Technology Laboratory effort on Mud Hammer Optimization at the recent Annual Conference and Exhibition for the Society of Petroleum Engineers. The original exhibit scheduled by NETL was canceled due to events surrounding the September tragedies in the US. TerraTek has completed analysis of drilling performance (rates of penetration, hydraulics, etc.) for themore » Phase One testing which was completed at the beginning of July. TerraTek jointly with the Industry Advisory Board for this project and DOE/NETL conducted a lessons learned meeting to transfer technology vital for the next series of performance tests. Both hammer suppliers benefited from the testing program and are committed to pursue equipment improvements and ''optimization'' in accordance with the scope of work. An abstract for a proposed publication by the society of Petroleum Engineers/International Association of Drilling Contractors jointly sponsored Drilling Conference was accepted as an alternate paper. Technology transfer is encouraged by the DOE in this program, thus plans are underway to prepare the paper for this prestigious venue.« less
Optimizing Geothermal Drilling: Oil and Gas Technology Transfer
DOE Office of Scientific and Technical Information (OSTI.GOV)
Tilley, Mitch; Eustes, Alfred; Visser, Charles
There is a significant amount of financial risk associated with geothermal drilling; however, there are opportunities to improve upon current practices and technologies used. The scope of this drilling operational study included 21 geothermal wells and 21 oil and gas wells. The goal was to determine a 'perfect well' using historical data to compare the best oil and gas well to the best geothermal well. Unfortunately, limitations encountered in the study included missing data (bit records, mud information, etc.), poor data collection, and difficult to ascertain handwriting. An online software database was used to format drilling data to IADC codedmore » daily drilling reports and generate analysis figures. Six major issues have been found in geothermal drilling operations. These problems include lost circulation, rig/equipment selection, cementing, penetration rate, drilling program, and time management. As a result of these issues, geothermal drilling averages 56.4 days longer than drilling comparable oil and gas wells in the wells in this study. Roughly $13.9 million would be lost due to non-productive time in the 21 geothermal wells and only $1.3 million in the oil and gas wells, assuming a cost of $50,000 per day. Comparable events such as drilling the same sized hole, tripping in/out, cementing, and running the same size casing took substantially less time in the oil and gas wells. Geothermal wells were drilled using older and/or less advanced technology to depths less than 10,000 feet, while oil and gas wells reached 12,500 feet faster with purpose built rigs. A new approach is now underway that will optimize drilling programs throughout the drilling industry. It is the use of Mechanical Specific Energy (MSE) as a tool to realize efficient drilling processes. However, a work-flow must also be established in order for there to be an efficient drilling program. Potential improvements for current geothermal operations are: the use of electronic records, real time services, and official glossary terms to describe rig operations, and advanced drilling rigs/technology.« less
Ocean Drilling Program: Mirror Sites
Publication services and products Drilling services and tools Online Janus database Search the ODP/TAMU web information, see www.iodp-usio.org. ODP | Search | Database | Drilling | Publications | Science | Cruise Info
Ocean Drilling Program: TAMU Staff Directory
products Drilling services and tools Online Janus database Search the ODP/TAMU web site ODP's main web site Employment Opportunities ODP | Search | Database | Drilling | Publications | Science | Cruise Info | Public
A proposal to investigate higher enthalpy geothermal systems in the USA
NASA Astrophysics Data System (ADS)
Elders, W. A.
2013-12-01
After more than 50 years of development only ~3,400 MWe of electric power is currently being produced from geothermal resources in the USA. That is only about 0.33% of the country's total installed electrical capacity. In spite of the large demonstrated potential of geothermal resources, only ~2,500 MWe of new geothermal electrical capacity are under development, and the growth rate of this environmentally benign energy resource is overshadowed by the rapid increase in the installed capacity of wind and solar energy. Most of the new geothermal developments in the USA involve relatively small, moderate-temperature, geothermal systems. In contrast, development of higher enthalpy geothermal systems for power production has obvious advantages; specifically higher temperatures yield higher power outputs per well so that fewer wells are needed, leading to smaller environmental footprints for a given size of power plant. Disadvantages include that the fact that locations of suitable geothermal systems are restricted to young volcanic terrains, production of very high enthalpy fluids usually requires drilling deeper wells and may require enhanced geothermal (EGS) technology, and drilling deep into hot hostile environments is technologically challenging. However the potential for very favorable economic returns suggests that the USA should begin developing such a program. One approach to mitigating the cost issue is to form a consortium of industry, government and academia to share the costs and broaden the scope an investigation. An excellent example of such a collaboration is the Iceland Deep Drilling Project (IDDP) which is investigating the economic feasibility of producing electricity from supercritical geothermal reservoirs. This industry-government consortium planned to drill a deep well in the volcanic caldera of Krafla in NE Iceland. However drilling had to be terminated at 2.1 km depth when 900°C rhyolite magma flowed into the well. The resultant well was highly productive capable of generating >35 MWe from superheated steam at a well-head temperature of ~450°C. Plans for deep drilling to explore for deeper, much higher enthalpy, geothermal resources are already underway in the Taupo Volcanic Zone of New Zealand (Project HADES), and in northeast Japan the 'Beyond Brittle Project' (Project JBBP) is an ambitious program attempting to create an EGS reservoir in ~500oC rocks. However in the USA there is no comparable national program to develop such resources. There is a significant undeveloped potential for developing high-enthalpy geothermal systems in the western USA, Hawaii and Alaska. The purpose of this paper is to encourage the formation of a consortium to systematically explore, assess, and eventually develop such higher-enthalpy geothermal resources. Not only would this help develop large new sources of energy but it would permit scientific studies of pressure-temperature regimes not otherwise available for direct investigation, such as the coupling of magmatic and hydrothermal systems.
30 CFR 250.1614 - Mud program.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 30 Mineral Resources 2 2010-07-01 2010-07-01 false Mud program. 250.1614 Section 250.1614 Mineral... OPERATIONS IN THE OUTER CONTINENTAL SHELF Sulphur Operations § 250.1614 Mud program. (a) The quantities, characteristics, use, and testing of drilling mud and the related drilling procedures shall be designed and...
Federal Geothermal Research Program Update, FY 2000
DOE Office of Scientific and Technical Information (OSTI.GOV)
Renner, Joel Lawrence
2001-08-01
The Department of Energy's Geothermal Program serves two broad purposes: 1) to assist industry in overcoming near-term barriers by conducting cost-shared research and field verification that allows geothermal energy to compete in today's aggressive energy markets; and 2) to undertake fundamental research with potentially large economic payoffs. The four categories of work used to distinguish the research activities of the Geothermal Program during FY 2000 reflect the main components of real-world geothermal projects. These categories form the main sections of the project descriptions in this Research Update. Exploration Technology research focuses on developing instruments and techniques to discover hidden hydrothermalmore » systems and to explore the deep portions of known systems. Research in geophysical and geochemical methods is expected to yield increased knowledge of hidden geothermal systems. Reservoir Technology research combines laboratory and analytical investigations with equipment development and field testing to establish practical tools for resource development and management for both hydrothermal reservoirs and enhanced geothermal systems. Research in various reservoir analysis techniques is generating a wide range of information that facilitates development of improved reservoir management tools. Drilling Technology focuses on developing improved, economic drilling and completion technology for geothermal wells. Ongoing research to avert lost circulation episodes in geothermal drilling is yielding positive results. Conversion Technology research focuses on reducing costs and improving binary conversion cycle efficiency, to permit greater use of the more abundant moderate-temperature geothermal resource, and on the development of materials that will improve the operating characteristics of many types of geothermal energy equipment. Increased output and improved performance of binary cycles will result from investigations in heat cycle research.« less
Federal Geothermal Research Program Update Fiscal Year 2000
DOE Office of Scientific and Technical Information (OSTI.GOV)
Renner, J.L.
2001-08-15
The Department of Energy's Geothermal Program serves two broad purposes: (1) to assist industry in overcoming near-term barriers by conducting cost-shared research and field verification that allows geothermal energy to compete in today's aggressive energy markets; and (2) to undertake fundamental research with potentially large economic payoffs. The four categories of work used to distinguish the research activities of the Geothermal Program during FY 2000 reflect the main components of real-world geothermal projects. These categories form the main sections of the project descriptions in this Research Update. Exploration Technology research focuses on developing instruments and techniques to discover hidden hydrothermalmore » systems and to explore the deep portions of known systems. Research in geophysical and geochemical methods is expected to yield increased knowledge of hidden geothermal systems. Reservoir Technology research combines laboratory and analytical investigations with equipment development and field testing to establish practical tools for resource development and management for both hydrothermal reservoirs and enhanced geothermal systems. Research in various reservoir analysis techniques is generating a wide range of information that facilitates development of improved reservoir management tools. Drilling Technology focuses on developing improved, economic drilling and completion technology for geothermal wells. Ongoing research to avert lost circulation episodes in geothermal drilling is yielding positive results. Conversion Technology research focuses on reducing costs and improving binary conversion cycle efficiency, to permit greater use of the more abundant moderate-temperature geothermal resource, and on the development of materials that will improve the operating characteristics of many types of geothermal energy equipment. Increased output and improved performance of binary cycles will result from investigations in heat cycle research.« less
NASA Astrophysics Data System (ADS)
Gardiner, L. S.; Hatheway, B.; Rogers, J. D.; Casey, J. G.; Lackey, G.; Birdsell, D.; Brown, K.; Polmear, M.; Capps, S.; Rosenblum, J.; Sitterley, K.; Hafich, K. A.; Hannigan, M.; Knight, D.
2015-12-01
The AirWaterGas Teacher Professional Development Program, run by the UCAR Center for Science Education, brought together scientists and secondary science teachers in a yearlong program culminating in the development of curriculum related to the impacts of unconventional oil and gas development. Graduate students and research scientists taught about their research area and its relationship to oil and gas throughout three online courses during the 2015-16 school year, during which teachers and scientists engaged in active online discussions. Topics covered included climate change, oil and gas infrastructure, air quality, water quality, public health, and practices and policies relating to oil and gas development. Building upon their initial online interactions and a face-to-face meeting in March, teachers were paired with appropriate AirWaterGas team members as science advisors during a month-long residency in Boulder, Colorado. During the residency, graduate student scientists provided resources and feedback as teachers developed curriculum projects in collaboration with each other and UCAR science educators. Additionally, teachers and AirWaterGas researchers shared experiences on an oil and gas well site tour, and a short course on drilling methods with a drilling rig simulator. Here, we share lessons learned from both sides of the aisle, including initial results from program assessment conducted with the participating teachers.
43 CFR 3162.3-1 - Drilling applications and plans.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 43 Public Lands: Interior 2 2012-10-01 2012-10-01 false Drilling applications and plans. 3162.3-1... for Operating Rights Owners and Operators § 3162.3-1 Drilling applications and plans. (a) Each well shall be drilled in conformity with an acceptable well-spacing program at a surveyed well location...
43 CFR 3162.3-1 - Drilling applications and plans.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 43 Public Lands: Interior 2 2014-10-01 2014-10-01 false Drilling applications and plans. 3162.3-1... for Operating Rights Owners and Operators § 3162.3-1 Drilling applications and plans. (a) Each well shall be drilled in conformity with an acceptable well-spacing program at a surveyed well location...
43 CFR 3162.3-1 - Drilling applications and plans.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 43 Public Lands: Interior 2 2011-10-01 2011-10-01 false Drilling applications and plans. 3162.3-1... for Operating Rights Owners and Operators § 3162.3-1 Drilling applications and plans. (a) Each well shall be drilled in conformity with an acceptable well-spacing program at a surveyed well location...
43 CFR 3162.3-1 - Drilling applications and plans.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 43 Public Lands: Interior 2 2013-10-01 2013-10-01 false Drilling applications and plans. 3162.3-1... for Operating Rights Owners and Operators § 3162.3-1 Drilling applications and plans. (a) Each well shall be drilled in conformity with an acceptable well-spacing program at a surveyed well location...
Physical exploration for uranium during 1951 in the Silver Reef district, Washington County, Utah
Stugard, Frederick
1953-01-01
During 1951 a joint exploration program of the most promising uraniferous areas in the Silver Reef district was made by the U.S. Geological Survey and the u.S. Atomic Energy Commission. A U.S. Bureau of Mines drill crew, on contract to the Atomic Energy Commission, did 2,450 feet of diamond drilling under the geological supervision of the U.S. Geological Survey. The purpose of the drilling was to delineate broadly the favorable ground for commercial development of the uranium depostis. Ten drill holes were located around Pumpkin Point, which is the northeastern end of Buckeye Reef, to probe for extensions of small ore shootsmined on the Point in fine-grained sandstones of the Chinle formation. Three additional holes were located around teh Tecumseh Hill to prbe for extensions of the small showings of uranium-bearing rocks of Buckeye Reef.
NASA Astrophysics Data System (ADS)
Banz, B.; Bohling, G.; Doveton, J.
2008-12-01
Traditional programs of geological education continue to be focused primarily on the evaluation of surface or near-surface geology accessed at outcrops and shallow boreholes. However, most students who graduate to careers in geology work almost entirely on subsurface problems, interpreting drilling records and petrophysical logs from exploration and production wells. Thus, college graduates commonly find themselves ill-prepared when they enter the petroleum industry and require specialized training in drilling and petrophysical log interpretation. To aid in this training process, we are developing an environment for interactive instruction in the geological aspects of petroleum reservoir characterization employing a virtual subsurface closely reflecting the geology of the US mid-continent, in the fictional setting of Small County, Kansas. Stochastic simulation techniques are used to generate the subsurface characteristics, including the overall geological structure, distributions of facies, porosity, and fluid saturations, and petrophysical logs. The student then explores this subsurface by siting exploratory wells and examining drilling and petrophysical log records obtained from those wells. We are developing the application using the Eclipse Rich Client Platform, which allows for the rapid development of a platform-agnostic application while providing an immersive graphical interface. The application provides an array of views to enable relevant data display and student interaction. One such view is an interactive map of the county allowing the student to view the locations of existing well bores and select pertinent data overlays such as a contour map of the elevation of an interesting interval. Additionally, from this view a student may choose the site of a new well. Another view emulates a drilling log, complete with drilling rate plot and iconic representation of examined drill cuttings. From here, students are directed to stipulate subsurface lithology and interval tops as they progress through the drilling operation. Once the interpretation process is complete, the student is guided through an exercise emulating a drill stem test and then is prompted to decide on perforation intervals. The application provides a graphical framework by which the student is guided through well site selection, drilling data interpretation, and well completion or dry-hole abandonment, creating a tight feedback loop by which the student gains an over-arching view of drilling logistics and the subsurface data evaluation process.
ERIC Educational Resources Information Center
Hughes, Ian E.
1998-01-01
Describes the pharma-CAL-ogy project, funded by Teaching and Learning Technology Programme (TLTP), which has developed various types of software for use in pharmacology courses. Topics include course organization and delivery software, drill and practice software, tutorial-type programs, simulations, and the need to integrate computer-assisted…
Drill Press Operator: Instructor's Guide.
ERIC Educational Resources Information Center
Kagan, Alfred; And Others
The course is intended to help meet, in a relatively short time, the need for trained operators in metalworking. It can be used by students with little education or experience and is suitable for use in adult education programs and in manpower development and training programs. The course is designed to be completed in approximately 30 weeks and…
DOE Office of Scientific and Technical Information (OSTI.GOV)
Khin, J.A.
Since reopening to foreign operators in 1989, companies have secured concessions and begun active exploration programs. This paper reports on: Yukong Oil (Block C) spudded well Indaw YK-1 last December and continued drilling below 8,500 ft. Well encountered frequent gas cut mud as well as lost circulation. BHP (Block H) spudded the Kawliya-1 in March this year and drilled to 6,500 ft. The well was dry and abandoned BHP plans to drill another well this year. Unocal (Block F) spudded its first well, the Kandaw-1, in May and plans to drill to 14,500 ft. Shell (Block G) began its firstmore » well in June. Shell's drilling program will consist of drilling four to six wells. Idemitsu (Block D) also spudded its first well in June. PetroCanada (Block E) plans to spud a well by December. Target depth is 12,000 ft.« less
Auto Indexer Auto-Indexer for Percussive Hammers: Vane Motor Dynamometer Testing
Su, Jiann
2012-01-01
Objectives Options associated with geothermal drilling operations are generally limited by factors such as formation temperature and rock strength. The objective of the research is to expand the "tool box" available to the geothermal driller by furthering the development of a high-temperature drilling motor that can be used in directional drilling applications for drilling high temperature geothermal formations. The motor is specifically designed to operate in conjunction with a pneumatic down-the-hole-hammer. It provides a more compact design compared to traditional drilling motors such as PDMs (positive displacement motors). The packaging can help to enhance directional drilling capabilities. It uses no elastomeric components, which enables it to operate in higher temperatures ( >250 °F). Current work on the motor has shown that is a capable of operating under pneumatic power with a down-the-hole-hammer. Further development work will include continued testing and refining motor components and evaluating motor capabilities. Targets/Milestones Complete testing current motor - 12/31/2010 Make final material and design decisions - 01/31/2011 Build and test final prototype - 04/31/2011 Final demonstration - 07/31/2011 Impacts The development of the motor will help to achieve program technical objectives by improving well construction capabilities. This includes enabling high-temperature drilling as well as enhancing directional drilling. A key component in the auto indexer is the drive motor. It is an air-driven vane motor that converts the energy stored in the compressed air to mechanical energy. The motor is attached to hammer-like components which impart an impulsive load onto the drive shaft. The impulsive force on the drive shaft in turn creates an indexing action. A controlled test was performed to characterize the performance of the the vane motor for a given pressure. The Sandia dynamometer test station was used to determine the performance of the motor for a given input pressure.
Engineering policy guidelines for design of drilled shafts.
DOT National Transportation Integrated Search
2011-10-01
These guidelines were developed as part of a comprehensive research program undertaken by the Missouri Department of Transportation (MoDOT) to reduce costs associated with design and construction of bridge foundations while maintaining appropriate le...
Engineering policy guidelines for design of drilled shafts.
DOT National Transportation Integrated Search
2011-08-01
These guidelines were developed as part of a comprehensive research program undertaken by the Missouri Department of : Transportation (MoDOT) to reduce costs associated with design and construction of bridge foundations while maintaining appropriate ...
Description and results of test-drilling program at Picatinny Arsenal, New Jersey, 1982-84
Harte, P.T.; Sargent, B.P.; Vowinkel, E.F.
1986-01-01
Picatinny Arsenal, located in north-central New Jersey, has a long history of explosives manufacturing. Past industrial activities and past waste-disposal practices have caused some groundwater contamination problems. In 1982, the U.S. Geological Survey, in cooperation with the U.S. Army, began a water resources investigation of the Arsenal. The test drilling program is designed to define the hydrogeology and install observation wells. Twenty-two boreholes were drilled and 21 observation wells installed in these holes. All drilling was done in a glaciated valley. The report includes lithologic and gamma-ray logs, results of grain-size analyses, well-construction data, and some groundwater levels. The generalized stratigraphic sequence of geologic units penetrated from the test-drilling program are from lower to upper: (1) pre-dominantly dolomitic Leithsville Formation, (2) in the upper part of bedrock, a weathered dolomite zone, (3) a thin discontinuous mantle of till, and (4) stratified drift deposit up to 208 ft thick. (USGS)
Direct Observation of Rhyolite Magma by Drilling: The Proposed Krafla Magma Drilling Project
NASA Astrophysics Data System (ADS)
Eichelberger, J. C.; Sigmundsson, F.; Papale, P.; Markusson, S.; Loughlin, S.
2014-12-01
Remarkably, drilling in Landsvirkjun Co.'s geothermal field in Krafla Caldera, Iceland has encountered rhyolite magma or hypersolidus rhyolite at 2.1-2.5 km depth in 3 wells distributed over 3.5 km2, including Iceland Deep Drilling Program's IDDP-1 (Mortensen, 2012). Krafla's most recent rifting and eruption (basalt) episode was 1975-1984; deformation since that time has been simple decay. Apparently rhyolite magma was either emplaced during that episode without itself erupting or quietly evolved in situ within 2-3 decades. Analysis of drill cuttings containing quenched melt from IDDP-1 yielded unprecedented petrologic data (Zierenberg et al, 2012). But interpreting active processes of heat and mass transfer requires knowing spatial variations in physical and chemical characteristics at the margin of the magma body, and that requires retrieving core - a not-inconceivable task. Core quenched in situ in melt up to 1150oC was recovered from Kilauea Iki lava lake, Hawaii by the Magma Energy Project >30 years ago. The site from which IDDP-1 was drilled, and perhaps IDDP-1 itself, may be available to attempt the first-ever coring of rhyolite magma, now proposed as the Krafla Magma Drilling Project (KMDP). KMDP would also include geophysical and geochemical experiments to measure the response of the magma/hydrothermal system to fluid injection and flow tests. Fundamental results will reveal the behavior of magma in the upper crust and coupling between magma and the hydrothermal system. Extreme, sustained thermal power output during flow tests of IDDP-1 suggests operation of a Kilauea-Iki-like freeze-fracture-flow boundary propagating into the magma and mining its latent heat of crystallization (Carrigan et al, EGU, 2014). Such an ultra-hot Enhanced Geothermal System (EGS) might be developable beneath this and other magma-heated conventional hydrothermal systems. Additionally, intra-caldera intrusions like Krafla's are believed to produce the unrest that is so troubling in populated calderas (e.g., Campi Flegrei, Italy). Experiments with the live system will aid in hazard assessment and eruption forecasting for this most difficult of volcano hazard problems. We will report on an International Continental Scientific Drilling Program (ICDP) workshop held to assess feasibility and to develop a plan for KMDP.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Kirby, M.J.; Kramer, S.R.; Pittard, G.T.
Jason Consultants International, Inc., under the sponsorship of the Gas Research Institute (GRI), has developed guidelines, procedures and software, which are described in this paper, for the installation of polyethylene gas pipe using guided horizontal drilling. Jason was aided in this development by two key subcontractors; Maurer Engineering who wrote the software and NICOR Technologies who reviewed the software and guidelines from a utility perspective. This program resulted in the development of commerically viable software for utilities, contractors, engineering firms, and others involved with the installation of pipes using guided horizontal drilling. The software is an interactive design tool thatmore » allows the user to enter ground elevation data, alignment information and pipe data. The software aides the engineer in designing a drill path and provides plan and profile views along with tabular data for pipe depth and surface profile. Finally, the software calculates installation loads and pipe stresses, compares these values against pipe manufacturer`s recommendations, and provides this information graphically and in tabular form. 5 refs., 18 figs., 2 tabs.« less
Astrobiology Drilling Program of the NASA Astrobiology Institute
NASA Astrophysics Data System (ADS)
Runnegar, B.
2004-12-01
Access to unweathered and uncontaminated samples of the least altered, oldest, sedimentary rocks is essential for understanding the early history of life on Earth and the environments in which it may have existed. For this reason, the NASA Astrobiology Institute (NAI) has embarked on two international programs, a series of Field Workshops aimed at making the most important surface samples available to investigators, and the Astrobiology Drilling Program (ADP), which serves to provide access to fresh subsurface samples when the scientific objectives require them. The Astrobiology Drilling Program commenced in Western Australia in 2003 with the initiation of its first project, the Archean Biosphere Drilling Project (ABDP). Funding for the ABDP came mainly from the Japanese Government through Kagoshima University and from NASA through the NAI Team at Pennsylvania State University, but significant technical and logistic support was provided by the Geological of Western Australia and, to a lesser extent, by the University of Western Australia. Six diamond drill cores totalling 1.4 km were obtained from astrobiologically important successions in the 3.3-3.5 Ga-old Pilbara Craton of northern Western Australia. Drilling in 2004 also occurred in Western Australia. The Deep Time Drilling Project (DTDP), a spin-off from the NAI's Mission to Early Earth Focus Group, completed one long hole, aimed mainly at fossil biomolecules (biomarkers) and other geochemical indicators of early life. The DTDP and the ABDP also jointly drilled two other important holes 2004, one through the oldest known erosion surface (and possible soil profile). The other intersected well-preserved middle Archean sediments. These efforts parallel other drilling initiatives within the wider astrobiological community that are taking place in Western Australia, South Africa, Spain, and arctic Canada. The ADP is managed by the NAI through a Steering Committee appointed by the NAI Director. Samples of cores obtained through ADP projects are available to the whole community, following a one year embargo, upon application to project PIs and the ADP Steering Committee.
Bridging worlds/charting new courses
NASA Astrophysics Data System (ADS)
This report describes the work being done within Sandia's renewable energy program. This work touches on four major disciplines. (1) Photovoltaics. The goal of this project is to develop costeffective, reliable energy system technologies for energy supplies worldwide produced by U.S. industry. It encompasses cell research and development, collector development, technology evaluation, systems engineering, domestic and international applications, and design assistance. (2) Solar Thermal. This project endeavors to develop and increase acceptance of solar thermal electric and industrial technologies as cost-competitive candidates for power generation and to promote their commercialization. Its' major activities are with dish/Stirling systems, the Solar Two power tower, design assistance to industry and users, technology development and research activities. (3) Wind. The wind project impacts domestic and international markets with commercially feasible systems for utility-scale and other applications of wind energy. The project conducts applied research in aerodynamics, structural dynamics, fatigue, materials and controls, and engineering systems, and develops cooperative work with industry. (4) Geothermal. This project is developing technology to increase proven geothermal reserves and is assisting industry in expanding geothermal power on-line. Development work is in stemhole drilling, drilling techniques, instrumentation for geothermal wells, acoustic telemetry, and drilling exploratory wells.
Education and Outreach Plans for the U.S. Drillship in IODP
NASA Astrophysics Data System (ADS)
White, K. S.; Reagan, M.; Klaus, A. D.
2003-12-01
The Integrated Ocean Drilling Program (IODP) began on October 1, 2003, following the end of operations of the 20-year Ocean Drilling Program (ODP). Education and outreach is a key component of IODP both nationally and internationally. The JOI Alliance (Joint Oceanographic Institutions, Inc., Texas A&M University, and Lamont Doherty Earth Observatory of Columbia University) will lead activities related to the U.S. drillship, coordinating these education and outreach efforts with those undertaken by the Central Management Organization, other IODP platform operators, and a U.S. Science Support Program successor. The Alliance will serve the national and assist the international scientific drilling communities by providing the results from the U.S. vessel to the public, government representatives, and scientists. The Alliance will expand upon media outreach strategies that were successful in ODP, such as issuing press releases at the conclusion of each leg and for major scientific breakthroughs; conducting tours, press conferences, and events during port calls; working with the press at major scientific meetings, and encouraging journalists to sail on expeditions. The Alliance will increase its education role by developing, coordinating, and disseminating educational materials and programs for teachers and students on the scientific themes and discoveries of IODP science. An important component of the outreach plan is using the vessel and associated laboratories and repositories as classrooms. IODP plans include multiple ship berths each year for teachers, based on the success of a pilot program conducted by ODP in 2001. This program, featuring a teacher onboard for a cruise, was accompanied by a distance-learning program and on-line curriculum models. Teachers can tour, both virtually and directly, laboratories and core repositories and participate in scheduled activities and courses. Using science conducted onboard the ship, the Alliance will develop online curriculum materials, as well as publications and fact sheets geared toward nonscientists. The Alliance will partner with existing scientific and education organizations, including programs at their universities, to widely disseminate IODP results and materials.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Deymonaz, John; Hulen, Jeffrey B.; Nash, Gregory D.
2008-01-22
The Emigrant Slimhole Drilling Project (ESDP) was a highly successful, phased resource evaluation program designed to evaluate the commercial geothermal potential of the eastern margin of the northern Fish Lake Valley pull-apart basin in west-central Nevada. The program involved three phases: (1) Resource evaluation; (2) Drilling and resource characterization; and (3) Resource testing and assessment. Efforts included detailed geologic mapping; 3-D modeling; compilation of a GIS database; and production of a conceptual geologic model followed by the successful drilling of the 2,938 foot deep 17-31 slimhole (core hole), which encountered commercial geothermal temperatures (327⁰ F) and exhibits an increasing, conductive,more » temperature gradient to total depth; completion of a short injection test; and compilation of a detailed geologic core log and revised geologic cross-sections. Results of the project greatly increased the understanding of the geologic model controlling the Emigrant geothermal resource. Information gained from the 17-31 core hole revealed the existence of commercial temperatures beneath the area in the Silver Peak Core Complex which is composed of formations that exhibit excellent reservoir characteristics. Knowledge gained from the ESDP may lead to the development of a new commercial geothermal field in Nevada. Completion of the 17-31 core hole also demonstrated the cost-effectiveness of deep core drilling as an exploration tool and the unequaled value of core in understanding the geology, mineralogy, evolutional history and structural aspects of a geothermal resource.« less
Geothermal Loan Guaranty Program and its impact on geothermal exploration and development
DOE Office of Scientific and Technical Information (OSTI.GOV)
Nasr, L.H.
1978-05-01
The study showed that the Geothermal Loan Guaranty Program has had only a negligible effect on geothermal development and the response to the program was far less than expected. The streamlining of environmental regulations and leasing policies, and the granting of intangible drilling cost write-offs and depletion allowances to operators would have had a greater impact on geothermal energy development. The loan guaranty program did not promote the undertaking of any new projects that would not have been undertaken without it. The program only accelerated the pace for some development which might have commenced in the future. Included in themore » study are recommendations for improving the operation of the program thereby increasing its attractiveness to potential applicants.« less
Laboratory Equipment for Investigation of Coring Under Mars-like Conditions
NASA Astrophysics Data System (ADS)
Zacny, K.; Cooper, G.
2004-12-01
To develop a suitable drill bit and set of operating conditions for Mars sample coring applications, it is essential to make tests under conditions that match those of the mission. The goal of the laboratory test program was to determine the drilling performance of diamond-impregnated bits under simulated Martian conditions, particularly those of low pressure and low temperature in a carbon dioxide atmosphere. For this purpose, drilling tests were performed in a vacuum chamber kept at a pressure of 5 torr. Prior to drilling, a rock, soil or a clay sample was cooled down to minus 80 degrees Celsius (Zacny et al, 2004). Thus, all Martian conditions, except the low gravity were simulated in the controlled environment. Input drilling parameters of interest included the weight on bit and rotational speed. These two independent variables were controlled from a PC station. The dependent variables included the bit reaction torque, the depth of the bit inside the drilled hole and the temperatures at various positions inside the drilled sample, in the center of the core as it was being cut and at the bit itself. These were acquired every second by a data acquisition system. Additional information such as the rate of penetration and the drill power were calculated after the test was completed. The weight of the rock and the bit prior to and after the test were measured to aid in evaluating the bit performance. In addition, the water saturation of the rock was measured prior to the test. Finally, the bit was viewed under the Scanning Electron Microscope and the Stereo Optical Microscope. The extent of the bit wear and its salient features were captured photographically. The results revealed that drilling or coring under Martian conditions in a water saturated rock is different in many respects from drilling on Earth. This is mainly because the Martian atmospheric pressure is in the vicinity of the pressure at the triple point of water. Thus ice, heated by contact with the rotating bit, sublimed and released water vapor. The volumetric expansion of ice turning into a vapor was over 150 000 times. This continuously generated volume of gas effectively cleared the freeze-dried rock cuttings from the bottom of the hole. In addition, the subliming ice provided a powerful cooling effect that kept the bit cold and preserved the core in its original state. Keeping the rock core below freezing also reduced drastically the chances of cross contamination. To keep the bit cool in near vacuum conditions where convective cooling is poor, some intermittent stops would have to be made. Under virtually the same drilling conditions, coring under Martian low temperature and pressure conditions consumed only half the power while doubling the rate of penetration as compared to drilling under Earth atmospheric conditions. However, the rate of bit wear was much higher under Martian conditions (Zacny and Cooper, 2004) References Zacny, K. A., M. C. Quayle, and G. A. Cooper (2004), Laboratory drilling under Martian conditions yields unexpected results, J. Geophys. Res., 109, E07S16, doi:10.1029/2003JE002203. Zacny, K. A., and G. A. Cooper (2004), Investigation of diamond-impregnated drill bit wear while drilling under Earth and Mars conditions, J. Geophys. Res., 109, E07S10, doi:10.1029/2003JE002204. Acknowledgments The research supported by the NASA Astrobiology, Science and Technology Instrument Development (ASTID) program.
NASA Technical Reports Server (NTRS)
1981-01-01
The National Science Foundation (NSF) initialized a new phase of exploration last year, a 10 year effort jointly funded by NSF and several major oil companies, known as the Ocean Margin Drilling Program (OMDP). The OMDP requires a ship with capabilities beyond existing drill ships; it must drill in 13,000 feet of water to a depth 20,000 feet below the ocean floor. To meet requirements, NSF is considering the conversion of the government-owned mining ship Glomar Explorer to a deep ocean drilling and coring vessel. Feasibility study performed by Donhaiser Marine, Inc. analyzed the ship's characteristics for suitability and evaluated conversion requirement. DMI utilized COSMIC's Ship Motion and Sea Load Computer program to perform analysis which could not be accomplished by other means. If approved for conversion, Glomar Explorer is expected to begin operations as a drillship in 1984.
Pre- and post-drill comparison of the Mount Elbert gas hydrate prospect, Alaska North Slope
Lee, M.W.; Agena, W.F.; Collett, T.S.; Inks, T.L.
2011-01-01
In 2006, the United States Geological Survey (USGS) completed a detailed analysis and interpretation of available 2-D and 3-D seismic data, along with seismic modeling and correlation with specially processed downhole well log data for identifying potential gas hydrate accumulations on the North Slope of Alaska. A methodology was developed for identifying sub-permafrost gas hydrate prospects within the gas hydrate stability zone in the Milne Point area. The study revealed a total of 14 gas hydrate prospects in this area.In order to validate the gas hydrate prospecting protocol of the USGS and to acquire critical reservoir data needed to develop a longer-term production testing program, a stratigraphic test well was drilled at the Mount Elbert prospect in the Milne Point area in early 2007. The drilling confirmed the presence of two prominent gas-hydrate-bearing units in the Mount Elbert prospect, and high quality well logs and core data were acquired. The post-drill results indicate pre-drill predictions of the reservoir thickness and the gas-hydrate saturations based on seismic and existing well data were 90% accurate for the upper unit (hydrate unit D) and 70% accurate for the lower unit (hydrate unit C), confirming the validity of the USGS approach to gas hydrate prospecting. The Mount Elbert prospect is the first gas hydrate accumulation on the North Slope of Alaska identified primarily on the basis of seismic attribute analysis and specially processed downhole log data. Post-drill well log data enabled a better constraint of the elastic model and the development of an improved approach to the gas hydrate prospecting using seismic attributes. ?? 2009.
Advantages and limitations of remotely operated sea floor drill rigs
NASA Astrophysics Data System (ADS)
Freudenthal, T.; Smith, D. J.; Wefer, G.
2009-04-01
A variety of research targets in marine sciences including the investigation of gas hydrates, slope stability, alteration of oceanic crust, ore formation and palaeoclimate can be addressed by shallow drilling. However, drill ships are mostly used for deep drillings, both because the effort of building up a drill string from a drill ship to the deep sea floor is tremendous and control on drill bit pressure from a movable platform and a vibrating drill string is poor especially in the upper hundred meters. During the last decade a variety of remotely operated drill rigs have been developed, that are deployed on the sea bed and operated from standard research vessels. These developments include the BMS (Bentic Multicoring System, developed by Williamson and Associates, operated by the Japanese Mining Agency), the PROD (Portable Remotely Operated Drill, developed and operated by Benthic Geotech), the Rockdrill 2 (developed and operated by the British geological Survey) and the MeBo (German abbreviation for sea floor drill rig, developed and operated by Marum, University of Bremen). These drill rigs reach drilling depths between 15 and 100 m. For shallow drillings remotely operated drill rigs are a cost effective alternative to the services of drill ships and have the major advantage that the drilling operations are performed from a stable platform independent of any ship movements due to waves, wind or currents. Sea floor drill rigs can be deployed both in shallow waters and the deep sea. A careful site survey is required before deploying the sea floor drill rig. Slope gradient, small scale topography and soil strength are important factors when planning the deployment. The choice of drill bits and core catcher depend on the expected geology. The required drill tools are stored on one or two magazines on the drill rig. The MeBo is the only remotely operated drill rig world wide that can use wire line coring technique. This method is much faster than conventional drilling. It has the advantage that the drill string stays in the drilled hole during the entire drilling process and prevents the drilled hole from collapsing while the inner core barrels comprising the drilled core sections are hooked up inside the drill string using a wire.
Reward and uncertainty in exploration programs
NASA Technical Reports Server (NTRS)
Kaufman, G. M.; Bradley, P. G.
1971-01-01
A set of variables which are crucial to the economic outcome of petroleum exploration are discussed. These are treated as random variables; the values they assume indicate the number of successes that occur in a drilling program and determine, for a particular discovery, the unit production cost and net economic return if that reservoir is developed. In specifying the joint probability law for those variables, extreme and probably unrealistic assumptions are made. In particular, the different random variables are assumed to be independently distributed. Using postulated probability functions and specified parameters, values are generated for selected random variables, such as reservoir size. From this set of values the economic magnitudes of interest, net return and unit production cost are computed. This constitutes a single trial, and the procedure is repeated many times. The resulting histograms approximate the probability density functions of the variables which describe the economic outcomes of an exploratory drilling program.
Drilling Polar Oceans with the European Research Icebreaker AURORA BOREALIS: the IODP Context
NASA Astrophysics Data System (ADS)
Lembke-Jene, Lester; Wolff-Boenisch, Bonnie; Azzolini, Roberto; Thiede, Joern; Biebow, Nicole; Eldholm, Olav; Egerton, Paul
2010-05-01
Polar oceans are characterized by extreme environmental conditions for humans and materials, and have remained the least accessible regions to scientists of the IODP. DSDP and ODP have for long faced specific technical and logistical problems when attempting to drill in ice-covered polar deep-sea basins. The Arctic Ocean and large areas of the high-latitude Southern Ocean remained largely un-sampled by ODP and remain one of the major scientific and technological challenges for IODP. Drilling in these regions has been discussed and anticipated for decades and the scientific rationales are reflected in the science plans of the international Nansen Arctic Drilling Program (NAD) or the Arctic Program Planning Group (APPG) of ODP/IODP, amongst others. More recently, the rationale to investigate the polar oceans in a holistic approach has been outlined by workshops, leading to strategic assessments of the scientific potential and new drilling proposals. The European Polar Board took the initiative to develop a plan for a novel and dedicated research icebreaker with technical capabilities hitherto unrealised. This research icebreaker will enable autonomous operations in the central Arctic Ocean and the Southern Ocean, even during the severest ice conditions in the deep winter, serving all marine disciplines of polar research including scientific drilling: The European Research Icebreaker and Deep-Sea Drilling Vessel AURORA BOREALIS. AURORA BOREALIS is presently planned as a multi-purpose vessel. The ship can be deployed as a research icebreaker in all polar waters during any season of the year, as it shall meet the specifications of the highest ice-class attainable (IACS Polar Code 1) for icebreakers. During the times when it is not employed for drilling, it will operate as the most technically advanced multi-disciplinary research vessel in the Arctic or polar Southern Ocean. AURORA BOREALIS will be a "European scientific flagship facility" (fully open to non-European partners), a multidisciplinary platform for studies ranging from the sub-seafloor into the atmosphere. AURORA BOREALIS was planned for her role in deep-sea drilling in consultation with engineers and technical experts familiar with the program and the operation of these vessels. All techniques currently deployed on IODP expeditions can be implemented onboard the vessel under polar weather and ice conditions, including the full range of re-entry, casing and cementing, and instrumentation options and the entire suite of downhole logging tools. Due to sufficient laboratory space, a full analytical workflow can be easily established comparable to existing permanent platforms, including clean rooms, diverse scanning and logging or incubation facilities. While the vessel is equipped with a dedicated deep-sea drilling rig, other coring and drilling techniques can be employed if needed (e.g. Rockdrill, MEBO, large diameter Kasten cores). AURORA BOREALIS is fitted to operate a CALYPSO Piston Coring System in polar waters. Future mud-return systems under consideration and testing for IODP to provide controlled borehole conditions in difficult facies are compatible with the layout of AURORA BOREALIS. The berthing capacity of 120 personnel total (scientists, technical support and crew) allows to accommodate a sufficient number of science party members offshore. The present scientific implementation documents plan for about one polar scientific drilling expedition per year in a to-be-determined configuration. As the vessel is a multi-dsiciplinary platform, operations for the entire year are not dependant on drilling operations alone. While principal access to the vessel will be based on a competitive proposal review and evaluation system, the allocation of timeslots specifically for drilling would preferably be given over to IODP handling and planning systems in a cooperative mode using the strengths and capacitites of the future program. Depending on interests and needs of the scientific communities a preferential focus in non-drilling expedition planning could be established e.g. for dedicated geophysical pre-site survey works in areas inaccessible by other vessels to secure critical data needed for later drilling expeditions. Based on ongoing expert consultations, it is safe to assume that the average costs for an Arctic or polar drilling expedition will be considerably lower than with an otherwise necessary multi-ship setup based on modelled expedition scenarios and annual operational cost calculations. Still, AURORA BOREALIS shall provide substantially enhanced scientific, operational, personnel and technical capacities offshore.
Lack of training threatening drilling talent supply
DOE Office of Scientific and Technical Information (OSTI.GOV)
Von Flatern, R.
When oil prices crashed in the mid-1980s, the industry tightened budgets. Among the austerity measures taken to survive the consequences of low product prices was an end to expensive, long-term investment training of drilling engineers. In the absence of traditional sources of trained drilling talent, forward-looking contractors are creating their own training programs. The paper describes the activities of some companies who are setting up their own training programs, and an alliance being set up by Chevron and Amoco for training. The paper also discusses training drilling managers, third-party trainers, and the consequences for the industry that does not renewmore » its inventory of people.« less
40 CFR 146.70 - Information to be evaluated by the Director.
Code of Federal Regulations, 2010 CFR
2010-07-01
... zone. Such data shall include a description of each well's type, construction, date drilled, location... program, well materials specifications and their life expectancy, logging procedures, deviation checks, and a drilling, testing and coring program; and (17) A demonstration pursuant to part 144, subpart F...
Physical Conditioning through Water Exercises.
ERIC Educational Resources Information Center
Conrad, C. Carson
This document describes activities in an aquatic program designed for an individual in sound health. Instructions for performing each activity are given in step-by-step outline form. The activities are arranged under the following categories: standing water drills; pool-side standing drills; gutter holding drills; bobbing (various forms);…
40 CFR 112.21 - Facility response training and drills/exercises.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 40 Protection of Environment 23 2012-07-01 2012-07-01 false Facility response training and drills/exercises. 112.21 Section 112.21 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER PROGRAMS OIL POLLUTION PREVENTION Response Requirements § 112.21 Facility response training and drills...
40 CFR 112.21 - Facility response training and drills/exercises.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 40 Protection of Environment 22 2014-07-01 2013-07-01 true Facility response training and drills/exercises. 112.21 Section 112.21 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER PROGRAMS OIL POLLUTION PREVENTION Response Requirements § 112.21 Facility response training and drills...
40 CFR 112.21 - Facility response training and drills/exercises.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 40 Protection of Environment 23 2013-07-01 2013-07-01 false Facility response training and drills/exercises. 112.21 Section 112.21 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER PROGRAMS OIL POLLUTION PREVENTION Response Requirements § 112.21 Facility response training and drills...
40 CFR 300.212 - Area response drills.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 40 Protection of Environment 29 2013-07-01 2013-07-01 false Area response drills. 300.212 Section... PLANNING, AND COMMUNITY RIGHT-TO-KNOW PROGRAMS NATIONAL OIL AND HAZARDOUS SUBSTANCES POLLUTION CONTINGENCY PLAN Planning and Preparedness § 300.212 Area response drills. The OSC periodically shall conduct...
40 CFR 300.212 - Area response drills.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 40 Protection of Environment 29 2012-07-01 2012-07-01 false Area response drills. 300.212 Section... PLANNING, AND COMMUNITY RIGHT-TO-KNOW PROGRAMS NATIONAL OIL AND HAZARDOUS SUBSTANCES POLLUTION CONTINGENCY PLAN Planning and Preparedness § 300.212 Area response drills. The OSC periodically shall conduct...
40 CFR 112.21 - Facility response training and drills/exercises.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 40 Protection of Environment 21 2010-07-01 2010-07-01 false Facility response training and drills/exercises. 112.21 Section 112.21 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER PROGRAMS OIL POLLUTION PREVENTION Response Requirements § 112.21 Facility response training and drills...
40 CFR 112.21 - Facility response training and drills/exercises.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 40 Protection of Environment 22 2011-07-01 2011-07-01 false Facility response training and drills/exercises. 112.21 Section 112.21 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER PROGRAMS OIL POLLUTION PREVENTION Response Requirements § 112.21 Facility response training and drills...
The Case for Scientific Drilling of Precambrian Sedimentary Sequences: A Mission to Early Earth
NASA Astrophysics Data System (ADS)
Buick, R.; Anbar, A. D.; Mojzsis, S. J.; Kaufman, A. J.; Kieft, T. L.; Lyons, T. W.; Humayun, M.
2001-12-01
Research into the emergence and early evolution of life, particularly in relation to environmental conditions, has intensified in the past decade. The field is energized by controversy (e.g., over the history of atmospheric composition, ocean redox, climate and biochemical pathways) and by the application of new biogeochemical tools (e.g., ion probe in situ stable isotope studies; improved geochronological techniques; non-mass-dependent stable isotope effects; stable metal isotope systematics; advances in organic geochemistry/biomarkers). The past decade has also seen improved understanding of old tools (notably, S isotopes), and new perspectives on evolution and on microbial interaction with the environment borne of the genomics revolution. Recent papers demonstrate the potential for innovative research when such developments are integrated, as well as the limitations of present knowledge. The chief limiting factor is not lack of scientists or advanced techniques, but availability of fresh samples from suitable successions. Where classic Precambrian stratigraphy exists, suitable rocks are rarely exposed due to interaction with the oxidizing atmosphere, occurrence of flat-lying strata or sedimentary cover. Available drill-cores are concentrated around ore bodies, and hence are inherently altered or not environmentally representative. Stratigraphic drilling using clean diamond drilling techniques, targeted in accord with scientific priorities, could provide samples of unmatched quality across the most interesting stratigraphic intervals. Diamond drilling is a proven, inexpensive technology for accessing subsurface material. The time is ripe to use this technology to secure the materials needed for further advances. The Mission to Early Earth (MtEE) Focus Group of the NASA Astrobiology Institute is developing a case for the acquisition, curation and distribution of suitable samples, with a special focus on diamond drilling. A communal activity is envisioned, modeled after the Ocean Drilling Program but focussing on the Precambrian record. This poster will present information on MtEE, and plans for a pilot project developed as part of the Summer '01 MtEE excursion to W. Australia.
Improved Tubulars for Better Economics in Deep Gas Well Drilling Using Microwave Technology
DOE Office of Scientific and Technical Information (OSTI.GOV)
Dinesh Agrawal
2006-09-30
The main objective of the entire research program has been to improve the rate-of-penetration in deep hostile environments by improving the life cycle and performance of coiled-tubing, an important component of a deep well drilling system for oil and gas exploration, by utilizing the latest developments in the microwave materials technology. Based on the results of the Phase I and insurmountable difficulties faced in the extrusion and de-waxing processes, the approach of achieving the goals of the program was slightly changed in the Phase II in which an approach of microwave sintering combined with Cold Isostatic Press (CIP) and joiningmore » (by induction or microwave) has been adopted. This process can be developed into a semicontinuous sintering process if the CIP can produce parts fast enough to match the microwave sintering rates. The main objective of the Phase II research program is to demonstrate the potential to economically manufacture microwave processed coiled tubing with improved performance for extended useful life under hostile coiled tubing drilling conditions. After the completion of the Phase II, it is concluded that scale up and sintering of a thin wall common O.D. size tubing that is widely used in the market is still to be proved and further experimentation and refinement of the sintering process is needed in Phase III. Actual manufacturing capability of microwave sintered, industrial quality, full length tubing will most likely require several million dollars of investment.« less
Improved Tubulars for Better Economics in Deep Gas Well Drilling using Microwave Technology
DOE Office of Scientific and Technical Information (OSTI.GOV)
Dinesh Agrawal; Paul Gigl; Mark Hunt
2007-07-31
The main objective of the entire research program has been to improve the rate-of-penetration in deep hostile environments by improving the life cycle and performance of coiled-tubing, an important component of a deep well drilling system for oil and gas exploration, by utilizing the latest developments in the microwave materials technology. Based on the results of the Phase I and insurmountable difficulties faced in the extrusion and de-waxing processes, the approach of achieving the goals of the program was slightly changed in the Phase II in which an approach of microwave sintering combined with Cold Isostatic Press (CIP) and joiningmore » (by induction or microwave) has been adopted. This process can be developed into a semicontinuous sintering process if the CIP can produce parts fast enough to match the microwave sintering rates. The main objective of the Phase II research program is to demonstrate the potential to economically manufacture microwave processed coiled tubing with improved performance for extended useful life under hostile coiled tubing drilling conditions. After the completion of the Phase II, it is concluded that scale up and sintering of a thin wall common O.D. size tubing that is widely used in the market is still to be proved and further experimentation and refinement of the sintering process is needed in Phase III. Actual manufacturing capability of microwave sintered, industrial quality, full length tubing will most likely require several million dollars of investment.« less
An Inexpensive Way of Teaching Uncertainty and Mineral Exploration Drilling in the Classroom
NASA Astrophysics Data System (ADS)
Aquino, J. S.
2014-12-01
This presentation is all about inexpensive ways of teaching uncertainty and mineral exploration drilling in the classroom. These labs were developed as an off-shoot of my years of mineral industry experience before I transitioned to geoscience education. I have developed several classroom lab exercises that relate to the role of modeling, uncertainty and prediction in mineral exploration. These lessons are mostly less expensive ($<5/group) hands-on activities that can be differentiated across grade levels. Early in the semester, modeling is explored through the cube and toilet paper roll puzzle lab. This is then immediately followed by the penny experiment that gives a physical meaning to the concept of uncertainty. However, it is the end-of-semester shoebox drilling lab that serves as the culminating activity for modeling, uncertainty and prediction. An object (orebody) is hidden inside a shoebox and the students are challenged to design a drilling program to predict the location and topology of a "mineral deposit". The students' decision on the location of the first few drill holes will be based on how they analyze, synthesize and evaluate simple surface topographic, geologic and geochemical +/- geophysical data overlain on top of the box. Before drilling, students are required to construct several geologic sections that will "model" the shape of the hidden orebody. Using bamboo skewers as their drilling equipment, students then commence their drilling and along the way learn the importance of drill spacing in decreasing uncertainty or increasing confidence. Lastly, the mineral separation lab gives them an opportunity to design another experiment that mimics mineral processing and learns a valuable lesson on the difficulties in recovery and how it relates to entropy (no such thing as 100% recoverability). The last two labs can be further enhanced with economic analysis through incorporation of drilling and processing costs. Students further appreciate the world of of mineral exploration with several YouTube videos on the use of 3D and 4D GIS mine modeling softwares. However at the same time, I forewarn them about the dangers on the dependence to these visually attractive computer-generated products without field verification or the fidelity to the ground-based and drillcore-based observations.
Godø, Olav Rune; Klungsøyr, Jarle; Meier, Sonnich; Tenningen, Eirik; Purser, Autun; Thomsen, Laurenz
2014-07-15
Environmental awareness and technological advances has spurred development of new monitoring solutions for the petroleum industry. This paper presents experience from a monitoring program off Norway. To maintain operation within the limits of the government regulations Statoil tested a new monitoring concept. Multisensory data were cabled to surface buoys and transmitted to land via wireless communication. The system collected information about distribution of the drilling wastes and the welfare of the corals in relation to threshold values. The project experienced a series of failures, but the backup monitoring provided information to fulfil the requirements of the permit. The experience demonstrated the need for real time monitoring and how such systems enhance understanding of impacts on marine organisms. Also, drilling operations may improve by taking environmental information into account. The paper proposes to standardize and streamline monitoring protocols to maintain comparability during all phases of the operation and between drill sites. Copyright © 2014 Elsevier Ltd. All rights reserved.
NASA Astrophysics Data System (ADS)
Jackson, M. D.; Gudmundsson, M. T.; Bach, W.; Cappelletti, P.; Coleman, N. J.; Ivarsson, M.; Jónasson, K.; Jørgensen, S. L.; Marteinsson, V.; McPhie, J.; Moore, J. G.; Nielson, D.; Rhodes, J. M.; Rispoli, C.; Schiffman, P.; Stefánsson, A.; Türke, A.; Vanorio, T.; Weisenberger, T. B.; White, J. D. L.; Zierenberg, R.; Zimanowski, B.
2015-12-01
A new International Continental Drilling Program (ICDP) project will drill through the 50-year-old edifice of Surtsey Volcano, the youngest of the Vestmannaeyjar Islands along the south coast of Iceland, to perform interdisciplinary time-lapse investigations of hydrothermal and microbial interactions with basaltic tephra. The volcano, created in 1963-1967 by submarine and subaerial basaltic eruptions, was first drilled in 1979. In October 2014, a workshop funded by the ICDP convened 24 scientists from 10 countries for 3 and a half days on Heimaey Island to develop scientific objectives, site the drill holes, and organize logistical support. Representatives of the Surtsey Research Society and Environment Agency of Iceland also participated. Scientific themes focus on further determinations of the structure and eruptive processes of the type locality of Surtseyan volcanism, descriptions of changes in fluid geochemistry and microbial colonization of the subterrestrial deposits since drilling 35 years ago, and monitoring the evolution of hydrothermal and biological processes within the tephra deposits far into the future through the installation of a Surtsey subsurface observatory. The tephra deposits provide a geologic analog for developing specialty concretes with pyroclastic rock and evaluating their long-term performance under diverse hydrothermal conditions. Abstracts of research projects are posted at http://surtsey.icdp-online.org.
Warwick, Peter D.; Breland, F. Clayton; Hackley, Paul C.; Dulong, Frank T.; Nichols, Douglas J.; Karlsen, Alexander W.; Bustin, R. Marc; Barker, Charles E.; Willett, Jason C.; Trippi, Michael H.
2006-01-01
In 2001, and 2002, the U.S. Geological Survey (USGS) and the Louisiana Geological Survey (LGS), through a Cooperative Research and Development Agreement (CRADA) with Devon SFS Operating, Inc. (Devon), participated in an exploratory drilling and coring program for coal-bed methane in north-central Louisiana. The USGS and LGS collected 25 coal core and cuttings samples from two coal-bed methane test wells that were drilled in west-central Caldwell Parish, Louisiana. The purpose of this report is to provide the results of the analytical program conducted on the USGS/LGS samples. The data generated from this project are summarized in various topical sections that include: 1. molecular and isotopic data from coal gas samples; 2. results of low-temperature ashing and X-ray analysis; 3. palynological data; 4. down-hole temperature data; 5. detailed core descriptions and selected core photographs; 6. coal physical and chemical analytical data; 7. coal gas desorption results; 8. methane and carbon dioxide coal sorption data; 9. coal petrographic results; and 10. geophysical logs.
Scientific Drilling in the Snake River Plain: Past, Present, and Future
NASA Astrophysics Data System (ADS)
Shervais, J. W.; Hanan, B. B.; Hughes, S. S.; Geist, D.; Vetter, S. K.
2006-12-01
The Snake River-Yellowstone volcanic province has long been linked to the concept of lithospheric drift over a fixed mantle thermal anomaly or hotspot. This concept is reinforced by seismic tomography that images this anomaly to depths around 500 km, but alternative proposals still present a serious challenge. Basaltic volcanism spans a significant age range and basaltic volcanism in the western SRP lies well off the hotspot track and cannot be related directly to the hotspot in any simple way. The plume-track age progression is documented by rhyolite volcanic centers, but even these represent extended time periods that overlap in age with adjacent centers. Scientific drilling projects carried out over the last two decades have made significant contributions to our understanding of both basaltic and rhyolitic volcanism associated with the Snake River-Yellowstone hotspot system. Because these drill holes also intercept sedimentary interbeds or, in the case of the western SRP, thick sections of Pliocene and Pleistocene sediments, they have also contributed to our understanding of basin formation by thermal collapse in the wake of the hotspot passage or by rifting, paleoclimate of the interior west, and groundwater systems in volcanic rocks. Many of these drill holes are associated with the Idaho National Laboratory (INL) in the eastern plain; others were drilled for geothermal or petroleum exploration. The latter include older holes that were not instrumented or logged in detail, but which still provide valuable stratigraphic controls. We focus here on the result of basalt drilling, which have been high-lighted in recent publications. Basaltic volcanism in the Snake River plain is dominated by olivine tholeiites that have major and trace element characteristics of ocean island basalt: the range in MgO is similar to MORB, but Ti, Fe, P, K, Sr, Zr and LREE/HREE ratios are all higher. Recent studies of basalts from the drill holes show that they evolved by fractionation in a mid-crustal sill complex that has been imaged seismically. Further, the chemical and isotopic systematics of these basalts require assimilation of consanguineous mafic material inferred to represent previously intruded sills. Major and trace element modeling suggest formation of the primary melts by melting of a source similar to E- MORB source. Trace element systematics document mixing between a plume-like source and a more depleted source that is not DMM. A similar more depleted source is inferred for Hawaii, suggesting that it is not continental lithosphere. Future scientific drilling in the SRP is the focus of Project HOTSPOT, a multi-disciplinary initiative that seeks to document time-space variations in the SRP-Yellowstone volcanic system. A workshop sponsored by the International Continental Drilling Program was held in May 2006 to develop a targeted program of scientific drilling that examines the entire plume-lithosphere system across a major lithospheric boundary, with holes targeting basalt, rhyolite, and sediments. These drill holes will complement geophysical studies of continental dynamics (e.g., Earthscope), as well as current studies centered on Yellowstone. Additional components of a targeted drilling program include studies of lacustrine sediments that document paleoclimate change in North America during the Pliocene—Pleistocene and fluid flow at deeper crustal levels.
Installation Restoration Program. Phase II. Confirmation/Quantification Stage I.
1986-02-24
Drilling and sampling three...borings at Site 8; o Drilling and sampling three borings at Site 11; and o Drilling and sampling three borings at Site 12. The ground water samples...8217-"~~~~~~.."." . " -’ - . .. . ;’ "..-. ’,"",,.- - -".-" - ’ -- -... ... ~ -. . ... ... " " 1 *. Sites Recommended Action Rationale U 8 Drill and sample one background To estimate
Rowan Gorilla I rigged up, heads for eastern Canada
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1984-03-01
Designed to operate in very hostile offshore environments, the first of the Rowan Gorilla class of self-elevating drilling rigs has been towed to its drilling assignment offshore Nova Scotia. About 40% larger than other jackups, these rigs can operate in 300 ft of water, drilling holes as deep as 30,000 ft. They also feature unique high-pressure and solids control systems that are expected to improve drilling procedures and efficiencies. A quantitative formation pressure evaluation program for the Hewlett-Packard HP-41 handheld calculator computes formation pressures by three independent methods - the corrected d exponent, Bourgoyne and Young, and normalized penetration ratemore » techniques for abnormal pressure detection and computation. Based on empirically derived drilling rate equations, each of the methods can be calculated separately, without being dependent on or influenced by the results or stored data from the other two subprograms. The quantitative interpretation procedure involves establishing a normal drilling rate trend and calculating the pore pressure from the magnitude of the drilling rate trend or plotting parameter increases above the trend line. Mobil's quick, accurate program could aid drilling operators in selecting the casing point, minimizing differential sticking, maintaining the proper mud weights to avoid kicks and lost circulation, and maximizing penetration rates.« less
ERIC Educational Resources Information Center
Stanford Univ., CA. Inst. for Mathematical Studies in Social Science.
Described in this report is the strand program as used in the teaching of drill-and-practice mathematics in California, Kentucky, and Mississippi schools, at the Tennessee A. and I. University, and in Washington, D.C.; as used in the drill-and-practice reading courses; in logic and algebra; in a second-year Russian program, and in…
40 CFR 146.14 - Information to be considered by the Director.
Code of Federal Regulations, 2010 CFR
2010-07-01
..., logging procedures, deviation checks, and a drilling, testing, and coring program; and (16) A certificate... information listed below which are current and accurate in the file. For a newly drilled Class I well, the..., construction, date drilled, location, depth, record of plugging and/or completion, and any additional...
Status of the Magma Energy Project
NASA Astrophysics Data System (ADS)
Dunn, J. C.
The current magma energy project is assessing the engineering feasibility of extracting thermal energy directly from crustal magma bodies. The estimated size of the U.S. resource (50,000 to 500,000 quads) suggests a considerable potential impact on future power generation. In a previous seven-year study, we concluded that there are no insurmountable barriers that would invalidate the magma energy concept. Several concepts for drilling, energy extraction, and materials survivability were successfully demonstrated in Kilauea Iki lava lake, Hawaii. The present program is addressing the engineering design problems associated with accessing magma bodies and extracting thermal energy for power generation. The normal stages for development of a geothermal resource are being investigated: exploration, drilling and completions, production, and surface power plant design. Current status of the engineering program and future plans are described.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Wilson, H.M.
There are positive signs today that conditions may be changing for the better offshore California. The prospects for exploratory drilling and resumption of long-delayed development of existing fields have improved. Some of the favorable happenings offshore include (1) the Interior Department may actually hold the offshore S. California lease sale before the year is out; (2) the Interior Department has issued a favorable draft environmental impact statement for the Santa Barbara Channel (this will help clear the way to drilling virtually all federal leases); (3) Exxon most certainly will start development of Hondo field in the billion-barrel Santa Unit (itmore » has won a vote of confidence of Santa Barbara County citizens); and (4) the new California State Lands Commission, while much tougher than its predecessors, has gradually been approving some drilling programs on state leases. The moratorium definitely is over. While activity is increasing on existing leases along the California coast, the real push will come when--or if--Interior holds its planned S. California lease sale later this year.« less
Optimizing Geothermal Drilling: Oil and Gas Technology Transfer
DOE Office of Scientific and Technical Information (OSTI.GOV)
Denninger, Kate; Eustes, Alfred; Visser, Charles
There is a significant amount of financial risk associated with geothermal drilling. This study of drilling operations seeks opportunities to improve upon current practices and technologies. The scope of this study included analyzing 21 geothermal wells and 21 oil and gas wells. The goal was to determine a 'Perfect Well' using historical data to compare the best oil and gas well to the best geothermal well. Unfortunately, limitations encountered in the study included missing data (bit records, mud information, etc.) and poor data collection practices An online software database was used to format drilling data to IADC coded daily drillingmore » reports and generate figures for analysis. Six major issues have been found in geothermal drilling operations. These problems include lost circulation, rig/ equipment selection, cementing, penetration rate, drilling program, and time management. As a result of these issues, geothermal drilling averaged 56.4 days longer than drilling comparable oil and gas wells in the wells in this study. Roughly $13.9 million was spent on non-productive time in the 21 geothermal wells, compared with only $1.3 million in the oil and gas wells, assuming a cost of $50,000 per day. Comparable events such as drilling the same sized hole, tripping in/out, cementing, and running the same size casing took substantially less time in the oil and gas wells. Geothermal wells were drilled using older and/or less advanced technology to depths less than 10,000 feet, while oil and gas wells reached 12,500 feet faster with purpose built rigs. A new approach is now underway that will optimize drilling programs throughout the drilling industry using Mechanical Specific Energy (MSE) as a tool to realize efficient drilling processes. Potential improvements for current geothermal operations are: the use of electronic records, real time services, and official glossary terms to describe rig operations, and advanced drilling rigs/technology.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Fathi Boukadi
2011-02-05
In this report, technologies for petroleum production and exploration enhancement in deepwater and mature fields are developed through basic and applied research by: (1) Designing new fluids to efficiently drill deepwater wells that can not be cost-effectively drilled with current technologies. The new fluids will be heavy liquid foams that have low-density at shallow dept to avoid formation breakdown and high density at drilling depth to control formation pressure. The goal of this project is to provide industry with formulations of new fluids for reducing casing programs and thus well construction cost in deepwater development. (2) Studying the effects ofmore » flue gas/CO{sub 2} huff n puff on incremental oil recovery in Louisiana oilfields bearing light oil. An artificial neural network (ANN) model will be developed and used to map recovery efficiencies for candidate reservoirs in Louisiana. (3) Arriving at a quantitative understanding for the three-dimensional controlled-source electromagnetic (CSEM) geophysical response of typical Gulf of Mexico hydrocarbon reservoirs. We will seek to make available tools for the qualitative, rapid interpretation of marine CSEM signatures, and tools for efficient, three-dimensional subsurface conductivity modeling.« less
Oil exploration and development in Marib/Al Jawf basin, Yemen Arab Republic
DOE Office of Scientific and Technical Information (OSTI.GOV)
Maycock, I.D.
1988-02-01
In 1981, Yemen Hunt Oil Company (YHOC) negotiated a production-sharing agreement covering 12,600 km/sup 2/ in the northeast part of the Yemen Arab Republic. A reconnaissance seismic program of 1864 km acquired in 1982 revealed the presence of a major half graben, designated the Marib/Al Jawf basin by YHOC. A sedimentary section up to 18,000 ft thick has been recognized. Geologic field mapping identified Jurassic carbonates covered by Cretaceous sands overlying Permian glaciolacustrine sediments, Paleozoic sandstones, or Precambrian basement. The first well, Alif-1, drilled in 1984, aimed at a possible Jurassic carbonate objective, encountered hydrocarbon-bearing sands in the Jurassic-Cretaceous transitionmore » between 5000 and 6000 ft. Appraisal and development drilling followed. The Alif field is believed to contain in excess of 400 million bbl of recoverable oil. Subsequent wildcat drilling has located additional accumulations while further amplifying basin stratigraphy. Rapid basin development took place in the Late Jurassic culminating with the deposition of Tithonian salt. The evaporites provide an excellent seal for hydrocarbons apparently sourced from restricted basin shales and trapped in rapidly deposited clastics.« less
Drilling to investigate processes in active tectonics and magmatism
NASA Astrophysics Data System (ADS)
Shervais, J.; Evans, J.; Toy, V.; Kirkpatrick, J.; Clarke, A.; Eichelberger, J.
2014-12-01
Coordinated drilling efforts are an important method to investigate active tectonics and magmatic processes related to faults and volcanoes. The US National Science Foundation (NSF) recently sponsored a series of workshops to define the nature of future continental drilling efforts. As part of this series, we convened a workshop to explore how continental scientific drilling can be used to better understand active tectonic and magmatic processes. The workshop, held in Park City, Utah, in May 2013, was attended by 41 investigators from seven countries. Participants were asked to define compelling scientific justifications for examining problems that can be addressed by coordinated programs of continental scientific drilling and related site investigations. They were also asked to evaluate a wide range of proposed drilling projects, based on white papers submitted prior to the workshop. Participants working on faults and fault zone processes highlighted two overarching topics with exciting potential for future scientific drilling research: (1) the seismic cycle and (2) the mechanics and architecture of fault zones. Recommended projects target fundamental mechanical processes and controls on faulting, and range from induced earthquakes and earthquake initiation to investigations of detachment fault mechanics and fluid flow in fault zones. Participants working on active volcanism identified five themes: the volcano eruption cycle; eruption sustainability, near-field stresses, and system recovery; eruption hazards; verification of geophysical models; and interactions with other Earth systems. Recommended projects address problems that are transferrable to other volcanic systems, such as improved methods for identifying eruption history and constraining the rheological structure of shallow caldera regions. Participants working on chemical geodynamics identified four major themes: large igneous provinces (LIPs), ocean islands, continental hotspot tracks and rifts, and convergent plate margins (subduction zones). This workshop brought together a diverse group of scientists with a broad range of scientific experience and interests. A particular strength was the involvement of both early-career scientists, who will initiate and carry out these new research programs, and more senior researchers with many years of experience in scientific drilling and active tectonics research. Each of the themes and questions outlined above has direct benefits to society, including improving hazard assessment, direct monitoring of active systems for early warning, renewable and non-renewable resource and energy exploitation, and predicting the environmental impacts of natural hazards, emphasizing the central role that scientific drilling will play in future scientific and societal developments.
ERIC Educational Resources Information Center
Feldman, David
1975-01-01
Presents a computerized program for foreign language learning giving drills for all the major language skills. The drills are followed by an extensive bibliography of documents in some way dealing with computer based instruction, particularly foreign language instruction. (Text is in Spanish.) (TL)
DOE Office of Scientific and Technical Information (OSTI.GOV)
Arnis Judzis
2002-10-01
This document details the progress to date on the OPTIMIZATION OF MUD HAMMER DRILLING PERFORMANCE -- A PROGRAM TO BENCHMARK THE VIABILITY OF ADVANCED MUD HAMMER DRILLING contract for the quarter starting July 2002 through September 2002. Even though we are awaiting the optimization portion of the testing program, accomplishments include the following: (1) Smith International agreed to participate in the DOE Mud Hammer program. (2) Smith International chromed collars for upcoming benchmark tests at TerraTek, now scheduled for 4Q 2002. (3) ConocoPhillips had a field trial of the Smith fluid hammer offshore Vietnam. The hammer functioned properly, though themore » well encountered hole conditions and reaming problems. ConocoPhillips plan another field trial as a result. (4) DOE/NETL extended the contract for the fluid hammer program to allow Novatek to ''optimize'' their much delayed tool to 2003 and to allow Smith International to add ''benchmarking'' tests in light of SDS Digger Tools' current financial inability to participate. (5) ConocoPhillips joined the Industry Advisors for the mud hammer program. (6) TerraTek acknowledges Smith International, BP America, PDVSA, and ConocoPhillips for cost-sharing the Smith benchmarking tests allowing extension of the contract to complete the optimizations.« less
NASA Astrophysics Data System (ADS)
Camerlenghi, Angelo; Lofi, Johanna; Aloisi, Vanni; Flecker, Rachel
2017-04-01
The origin of the Mediterranean salt giant is linked to an extraordinary event in the geological history of the Mediterranean region, commonly referred to as the Messinian Salinity Crisis (MSC). After 45 years of intense yet disunited research efforts, the international scientific community at large faces a unique opportunity to access the deep and marginal basins Messinian depositional successions in the Mediterranean through scientific drilling, namely through the Integrated Ocean Discovery Program (IODP) and the International Continental Drilling Program (ICDP). Scientific activity to promote scientific drilling offshore and onshore is in progress under the broad umbrella of the Uncovering a Salt Giant' IODP Multi-Platform Drilling proposal, that has generated the Deep-Sea Records of the Messinian Salinity Crisis (DREAM) site-specific pre-proposal for riserless drilling on Messinian marginal basins and the related ICDP-IODP amphibious initiative Investigating Miocene Mediterranean- Atlantic gateway exchange (IMMAGE). Scientific networking has begun to establish a broad cross-disciplinary research community embracing geology, geophysics, geochemistry, microbiology, and paleoclimatology. Formal networking activities represent an opportunity for the scientific community to share objectives, data, expertise and tools with industry since there is considerable interest in oil and gas exploration, and consequent hazards, targeting the Mediterranean's deep salt deposits. With the acronym MEDSALT, we have established two networks working in close cooperation: (1) COST Action CA15103 Uncovering the Mediterranean salt giant (MEDSALT) (https://medsalt.eu/) is a 4-year long network established in May 2016 comprising scientific institutions from 28 states. This COST Action will provide an opportunity to develop further our knowledge of salt rock formation addressing four overarching scientific questions: a) What are the causes, timing and emplacement mechanisms of the Mediterranean salt giant? b) What are the factors responsible for and the socio-economic consequences of early salt deformation and fluid flow across and out of the halite layer? c) Do salt giants promote the development of a phylogenetically diverse and exceptionally active deep biosphere? d) What are the mechanisms underlying the spectacular vertical motions inside basins and their margins? (2) ANR Project 'Uncovering the Mediterranean Salt Giant' (MEDSALT) aims at establishing networking action to prepare an Integrated Ocean Discovery Program (IODP) full proposal to drill the Mediterranean Salt Giant with the R/V JOIDES Resolution. This 18-month long network consists of a core group of 22 scientists from 10 countries working in close cooperation with the brother COST Action MEDSALT. These inter-sectorial and multinational cooperation networks comprise a critical mass of both experienced and early-career researchers from Europe and beyond. The goal will be achieved through capacity building, researchers' mobility, skills development, knowledge exchange and scientific networking.
Federal Register 2010, 2011, 2012, 2013, 2014
2013-03-28
... Drilling Program in the Chukchi Sea, Alaska AGENCY: National Marine Fisheries Service (NMFS), National... numbers of marine mammals, by harassment, incidental to conducting offshore exploration drilling on Outer... offshore exploration drilling on OCS leases in the Chukchi Sea, Alaska, during the 2014 open-water season...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-04-26
... Drilling Program in the Chukchi Sea, Alaska AGENCY: National Marine Fisheries Service (NMFS), National... conducting offshore exploration drilling on Outer Continental Shelf (OCS) leases in the Chukchi Sea, Alaska... incidental to COP's offshore exploration drilling in the Chukchi Sea during the 2014 open- [[Page 24732...
30 CFR 250.456 - What safe practices must the drilling fluid program follow?
Code of Federal Regulations, 2012 CFR
2012-07-01
... circulate a volume of drilling fluid equal to the annular volume with the drill pipe just off-bottom. You... volume needed to fill the hole. Both sets of numbers must be posted near the driller's station. You must... industry-accepted practices and include density, viscosity, and gel strength; hydrogenion concentration...
30 CFR 250.456 - What safe practices must the drilling fluid program follow?
Code of Federal Regulations, 2014 CFR
2014-07-01
... circulate a volume of drilling fluid equal to the annular volume with the drill pipe just off-bottom. You... volume needed to fill the hole. Both sets of numbers must be posted near the driller's station. You must... industry-accepted practices and include density, viscosity, and gel strength; hydrogenion concentration...
30 CFR 250.456 - What safe practices must the drilling fluid program follow?
Code of Federal Regulations, 2013 CFR
2013-07-01
... circulate a volume of drilling fluid equal to the annular volume with the drill pipe just off-bottom. You... volume needed to fill the hole. Both sets of numbers must be posted near the driller's station. You must... industry-accepted practices and include density, viscosity, and gel strength; hydrogenion concentration...
2001-08-01
Apollo-era technology spurred the development of cordless products that we take for granted everyday. In the 1960s, NASA asked Black Decker to develop a special drill that would be powerful enough to cut through hard layers of the lunar surface and be lightweight, compact, and operate under its own power source, allowing Apollo astronauts to collect lunar samples further away from the Lunar Experiment Module. In response, Black Decker developed a computer program that analyzed and optimized drill motor operations. From their analysis, engineers were able to design a motor that was powerful yet required minimal battery power to operate. Since those first days of cordless products, Black Decker has continued to refine this technology and they now sell their rechargeable products worldwide (i.e. the Dustbuster, cordless tools for home and industrial use, and medical tools.)
NASA Technical Reports Server (NTRS)
2001-01-01
Apollo-era technology spurred the development of cordless products that we take for granted everyday. In the 1960s, NASA asked Black Decker to develop a special drill that would be powerful enough to cut through hard layers of the lunar surface and be lightweight, compact, and operate under its own power source, allowing Apollo astronauts to collect lunar samples further away from the Lunar Experiment Module. In response, Black Decker developed a computer program that analyzed and optimized drill motor operations. From their analysis, engineers were able to design a motor that was powerful yet required minimal battery power to operate. Since those first days of cordless products, Black Decker has continued to refine this technology and they now sell their rechargeable products worldwide (i.e. the Dustbuster, cordless tools for home and industrial use, and medical tools.)
NASA Astrophysics Data System (ADS)
Cotterill, Carol; McInroy, David; Stevenson, Alan
2013-04-01
Mission Specific Platform (MSP) expeditions are operated by the European Consortium for Ocean Research Drilling (ECORD). Each MSP expedition is unique within the Integrated Ocean Drilling Program (IODP). In order to complement the abilities of the JOIDES Resolution and the Chikyu, the ECORD Science Operator (ESO) must source vessels and technology suitable for each MSP proposal on a case-by-case basis. The result is that ESO can meet scientific requirements in a flexible manner, whilst maintaining the measurements required for the IODP legacy programme. The process of tendering within EU journals for vessels and technology means that the planning process for each MSP Expedition starts many years in advance of the operational phase. Involvement of proposal proponents from this early stage often leads to the recognition for technological research and development to best meet the scientific aims and objectives. One example of this is the planning for the Atlantis Massif proposal, with collaborative development between the British Geological Survey (BGS) and MARUM, University of Bremen, on suitable instruments for seabed drills, with the European Petrophysics Consortium (EPC) driving the development of suitable wireline logging tools that can be used in association with such seabed systems. Other technological developments being undertaken within the European IODP community include in-situ pressure sampling for gas hydrate expeditions, deep biosphere and fluid sampling equipment and CORK technology. This multi-national collaborative approach is also employed by ESO in the operational phase. IODP Expedition 302 ACEX saw vessel and ice management support from Russia and Sweden to facilitate the first drilling undertaken in Arctic sea ice. A review of MSP expeditions past, present and future reveal the significant impact of European led operations and scientific research within the current IODP programme, and also looking forward to the start of the new International Ocean Discovery Programme in October 2013. Key successes encompass technological development, operational procedures in sensitive areas and research into palaeoclimate and shoreline responses to sea level change amongst others. Increased operational flexibility in the new programme only serves to make the future an exciting one for ocean drilling in Europe.
Environmental Assessment of the Hawaii Geothermal Project Well Flow Test Program
DOE Office of Scientific and Technical Information (OSTI.GOV)
None
1976-11-01
The Hawaii Geothermal Project, a coordinated research effort of the University of Hawaii, funded by the County and State of Hawaii, and ERDA, was initiated in 1973 in an effort to identify, generate, and use geothermal energy on the Big Island of Hawaii. A number of stages are involved in developing geothermal power resources: exploration, test drilling, production testing, field development, power plant and powerline construction, and full-scale production. Phase I of the Project, which began in the summer of 1973, involved conducting exploratory surveys, developing analytical models for interpretation of geophysical results, conducting studies on energy recovery from hotmore » brine, and examining the legal and economic implications of developing geothermal resources in the state. Phase II of the Project, initiated in the summer of 1975, centers on drilling an exploratory research well on the Island of Hawaii, but also continues operational support for the geophysical, engineering, and socioeconomic activities delineated above. The project to date is between the test drilling and production testing phase. The purpose of this assessment is to describe the activities and potential impacts associated with extensive well flow testing to be completed during Phase II.« less
Using the Microcomputer to Develop Listening Skills.
ERIC Educational Resources Information Center
Mohler, Stephen C.
A college-level introductory Spanish instructional system uses an interactive combination of microcomputer and program-stop tape recorder to enhance students' listening skills. The basic content is listening drills, adapted to the computer medium. Microcomputer use adds considerable versatility to instructional materials, including such features…
Federal Geothermal Research Program Update - Fiscal Year 2004
DOE Office of Scientific and Technical Information (OSTI.GOV)
Patrick Laney
2005-03-01
The Department of Energy (DOE) and its predecessors have conducted research and development (R&D) in geothermal energy since 1971. The Geothermal Technologies Program (GTP) works in partnership with industry to establish geothermal energy as an economically competitive contributor to the U.S. energy supply. Geothermal energy production, a $1.5 billion a year industry, generates electricity or provides heat for direct use applications. The technologies developed by the Geothermal Technologies Program will provide the Nation with new sources of electricity that are highly reliable and cost competitive and do not add to America's air pollution or the emission of greenhouse gases. Geothermalmore » electricity generation is not subject to fuel price volatility and supply disruptions from changes in global energy markets. Geothermal energy systems use a domestic and renewable source of energy. The Geothermal Technologies Program develops innovative technologies to find, access, and use the Nation's geothermal resources. These efforts include emphasis on Enhanced Geothermal Systems (EGS) with continued R&D on geophysical and geochemical exploration technologies, improved drilling systems, and more efficient heat exchangers and condensers. The Geothermal Technologies Program is balanced between short-term goals of greater interest to industry, and long-term goals of importance to national energy interests. The program's research and development activities are expected to increase the number of new domestic geothermal fields, increase the success rate of geothermal well drilling, and reduce the costs of constructing and operating geothermal power plants. These improvements will increase the quantity of economically viable geothermal resources, leading in turn to an increased number of geothermal power facilities serving more energy demand. These new geothermal projects will take advantage of geothermal resources in locations where development is not currently possible or economical.« less
Federal Geothermal Research Program Update Fiscal Year 2004
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
2005-03-01
The Department of Energy (DOE) and its predecessors have conducted research and development (R&D) in geothermal energy since 1971. The Geothermal Technologies Program (GTP) works in partnership with industry to establish geothermal energy as an economically competitive contributor to the U.S. energy supply. Geothermal energy production, a $1.5 billion a year industry, generates electricity or provides heat for direct use applications. The technologies developed by the Geothermal Technologies Program will provide the Nation with new sources of electricity that are highly reliable and cost competitive and do not add to America's air pollution or the emission of greenhouse gases. Geothermalmore » electricity generation is not subject to fuel price volatility and supply disruptions from changes in global energy markets. Geothermal energy systems use a domestic and renewable source of energy. The Geothermal Technologies Program develops innovative technologies to find, access, and use the Nation's geothermal resources. These efforts include emphasis on Enhanced Geothermal Systems (EGS) with continued R&D on geophysical and geochemical exploration technologies, improved drilling systems, and more efficient heat exchangers and condensers. The Geothermal Technologies Program is balanced between short-term goals of greater interest to industry, and long-term goals of importance to national energy interests. The program's research and development activities are expected to increase the number of new domestic geothermal fields, increase the success rate of geothermal well drilling, and reduce the costs of constructing and operating geothermal power plants. These improvements will increase the quantity of economically viable geothermal resources, leading in turn to an increased number of geothermal power facilities serving more energy demand. These new geothermal projects will take advantage of geothermal resources in locations where development is not currently possible or economical.« less
SALTON SEA SCIENTIFIC DRILLING PROJECT: SCIENTIFIC PROGRAM.
Sass, J.H.; Elders, W.A.
1986-01-01
The Salton Sea Scientific Drilling Project, was spudded on 24 October 1985, and reached a total depth of 10,564 ft. (3. 2 km) on 17 March 1986. There followed a period of logging, a flow test, and downhole scientific measurements. The scientific goals were integrated smoothly with the engineering and economic objectives of the program and the ideal of 'science driving the drill' in continental scientific drilling projects was achieved in large measure. The principal scientific goals of the project were to study the physical and chemical processes involved in an active, magmatically driven hydrothermal system. To facilitate these studies, high priority was attached to four areas of sample and data collection, namely: (1) core and cuttings, (2) formation fluids, (3) geophysical logging, and (4) downhole physical measurements, particularly temperatures and pressures.
DOE Office of Scientific and Technical Information (OSTI.GOV)
None
2010-06-01
The U.S. Department of Energy (DOE) Office of Legacy Management developed this report as a guide for discussions with the Colorado State regulators and other interested stakeholders in response to increased drilling for natural gas reserves near the underground nuclear explosion site at Rulison, Colorado. The Rulison site is located in the Piceance Basin of western Colorado, 40 miles northeast of Grand Junction. The Rulison test was the second natural gas reservoir stimulation experiment in the Plowshare Program, which was designed to develop peaceful uses for nuclear energy. On September 10, 1969, the U.S. Atomic Energy Commission, a predecessor agencymore » of DOE, detonated a 40-kiloton nuclear device 8426 feet below the ground surface in an attempt to release commercially marketable quantities of natural gas. The blast vaporized surrounding rock and formed a cavity about 150 feet in diameter. Although the contaminated materials from drilling operations were subsequently removed from the surface of the blast site, no feasible technology exists to remove subsurface radioactive contamination in or around the test cavity. An increase in drilling for natural gas near the site has raised concern about the possibility of encountering residual radioactivity from the area of the detonation. DOE prohibits drilling in the 40-acre lot surrounding the blast site at a depth below 6000 feet. DOE has no evidence that indicates contamination from the Rulison site detonation has migrated or will ever migrate beyond the 40-acre institutional control boundary. The Colorado Oil and Gas Conservation Commission (COGCC) established two wider boundaries around the site. When a company applies for a permit to drill within a 3-mile radius of surface ground zero, COGCC notifies DOE and provides an opportunity to comment on the application. COGCC also established a half-mile radius around surface ground zero. An application to drill within one-half mile requires a full hearing before the commission. This report outlines DOE's recommendation that gas developers adopt a conservative, staged drilling approach allowing gas reserves near the Rulison site to be recovered in a manner that minimizes the likelihood of encountering contamination. This staged approach calls for collecting data from wells outside the half-mile zone before drilling closer, and then drilling within the half-mile zone in a sequential manner, first at low contamination probability locations and then moving inward. DOE's recommended approach for drilling in this area will protect public safety while allowing collection of additional data to confirm that contamination is contained within the 40-acre institutional control boundary.« less
NASA Astrophysics Data System (ADS)
Pound, K. S.; St. John, K.; Krissek, L. A.; Jones, M. H.; Leckie, R. M.; Pyle, E. J.
2008-12-01
That the ocean basins provide a record of past global climate changes through their sediment cores is often a surprise or novel idea for students. Equally surprising to many students is the fact that current research is being undertaken in remote polar regions, even though sedimentary records already exist from the low and mid latitude regions. Students are often also perplexed about how decisions are made regarding the selection of drill sites in the polar regions. Using an inquiry-based approach we are developing a series of simple exercises that are scaffolded to build student understanding around the question "Why Drill Here?" The exercises are based on IODP Expedition 302 (ACEX) in the Arctic, and on the Antarctic Geological Drilling (ANDRILL) program, which are used as case studies. The "Why Drill Here?" question is addressed at multiple levels so students can formulate a scientific rationale behind selection of sites for seafloor drilling in the Arctic and Antarctic regions. Technological challenges and solutions to doing field-based science in polar regions are explored. Finally, a subset of research results are investigated and compared with the current scientific paradigm on Cenozoic climate evolution to demonstrate that science is an evolving process. These exercises can be adapted for use in a variety of Introductory Earth Science classes.
HOLEGAGE 1.0 - Strain-Gauge Drilling Analysis Program
NASA Technical Reports Server (NTRS)
Hampton, Roy V.
1992-01-01
Interior stresses inferred from changes in surface strains as hole is drilled. Computes stresses using strain data from each drilled-hole depth layer. Planar stresses computed in three ways: least-squares fit for linear variation with depth, integral method to give incremental stress data for each layer, and/or linear fit to integral data. Written in FORTRAN 77.
30 CFR 250.415 - What must my casing and cementing programs include?
Code of Federal Regulations, 2011 CFR
2011-07-01
... ENFORCEMENT, DEPARTMENT OF THE INTERIOR OFFSHORE OIL AND GAS AND SULPHUR OPERATIONS IN THE OUTER CONTINENTAL SHELF Oil and Gas Drilling Operations Applying for A Permit to Drill § 250.415 What must my casing and... in Deep Water Wells (incorporated by reference as specified in § 250.198), if you drill a well in...
30 CFR 250.411 - What information must I submit with my application?
Code of Federal Regulations, 2011 CFR
2011-07-01
... ENFORCEMENT, DEPARTMENT OF THE INTERIOR OFFSHORE OIL AND GAS AND SULPHUR OPERATIONS IN THE OUTER CONTINENTAL SHELF Oil and Gas Drilling Operations Applying for A Permit to Drill § 250.411 What information must I... proposed well § 250.413 (c) Drilling prognosis § 250.414 (d) Casing and cementing programs § 250.415 (e...
30 CFR 250.456 - What safe practices must the drilling fluid program follow?
Code of Federal Regulations, 2011 CFR
2011-07-01
... fluid. You must circulate a volume of drilling fluid equal to the annular volume with the drill pipe... fluid volume needed to fill the hole. Both sets of numbers must be posted near the driller's station... warrant. Your tests must conform to industry-accepted practices and include density, viscosity, and gel...
Accessing SAFOD data products: Downhole measurements, physical samples and long-term monitoring
NASA Astrophysics Data System (ADS)
Weiland, C.; Zoback, M.; Hickman, S. H.; Ellsworth, W. L.
2005-12-01
Many different types of data were collected during SAFOD Phases 1 and 2 (2004-2005) as part of the National Science Foundation's EarthScope program as well as from the SAFOD Pilot Hole, drilled in 2002 and funded by the International Continental Drilling Program (ICDP). Both SAFOD and the SAFOD Pilot Hole are being conducted as a close collaboration between NSF, the U.S. Geological Survey and the ICDP. SAFOD data products include cuttings, core and fluid samples; borehole geophysical measurements; and strain, tilt, and seismic recordings from the multilevel SAFOD borehole monitoring instruments. As with all elements of EarthScope, these data (and samples) are openly available to members of the scientific and educational communities. This paper presents the acquisition, storage and distribution plan for SAFOD data products. Washed and unwashed drill cuttings and mud samples were collected during Phases 1 and 2, along with three spot cores at depths of 1.5, 2.5, and 3.1 km. A total of 52 side-wall cores were also collected in the open-hole interval between 2.5 and 3.1 km depth. The primary coring effort will occur during Phase 3 (2007), when we will continuously core up to four, 250-m-long multilaterals directly within and adjacent to the San Andreas Fault Zone. Drill cuttings, core, and fluid samples from all three Phases of SAFOD drilling are being curated under carefully controlled conditions at the Integrated Ocean Drilling Program (IODP) Gulf Coast Repository in College Station, Texas. Photos of all physical samples and a downloadable sample request form are available on the ICDP website (http://www.icdp-online.de/sites/sanandreas/index/index.html). A suite of downhole geophysical measurements was conducted during the first two Phases of SAFOD drilling, as well as during drilling of the SAFOD Pilot Hole. These data include density, resistivity, porosity, seismic and borehole image logs and are also available via the ICDP website. The SAFOD monitoring program includes fiber-optic strain, tilt, seismic and fluid-pressure recording instruments. Seismic data from the Pilot Hole array are now available in SEED format from the Northern California Earthquake Data Center (http://quake.geo.berkeley.edu/safod/). The strain and tilt instruments are still undergoing testing and quality assurance, and these data will be available through the same web site as soon as possible. Lastly, two terabytes of unprocessed (SEG-2 format) data from a two-week deployment of an 80-level seismic array during April/May 2005 by Paulsson Geophysical Services, Inc. are now available via the IRIS data center (http://www.iris.edu/data/data.htm). Drilling parameters include real-time descriptions of drill cuttings mineralogy, drilling mud properties, and mechanical data related to the drilling process and are available via the ICDP web site. Current status reports on SAFOD drilling, borehole measurements, sampling, and monitoring instrumentation will continue to be available from the EarthScope web site (http://www.earthscope.org).
Approaches to Linked Open Data at data.oceandrilling.org
NASA Astrophysics Data System (ADS)
Fils, D.
2012-12-01
The data.oceandrilling.org web application applies Linked Open Data (LOD) patterns to expose Deep Sea Drilling Project (DSDP), Ocean Drilling Program (ODP) and Integrated Ocean Drilling Program (IODP) data. Ocean drilling data is represented in a rich range of data formats: high resolution images, file based data sets and sample based data. This richness of data types has been well met by semantic approaches and will be demonstrated. Data has been extracted from CSV, HTML and RDBMS through custom software and existing packages for loading into a SPARQL 1.1 compliant triple store. Practices have been developed to streamline the maintenance of the RDF graphs and properly expose them using LOD approaches like VoID and HTML embedded structured data. Custom and existing vocabularies are used to allow semantic relations between resources. Use of the W3c draft RDF Data Cube Vocabulary and other approaches for encoding time scales, taxonomic fossil data and other graphs will be shown. A software layer written in Google Go mediates the RDF to web pipeline. The approach used is general and can be applied to other similar environments like node.js or Python Twisted. To facilitate communication user interface software libraries such as D3 and packages such as S2S and LodLive have been used. Additionally OpenSearch API's, structured data in HTML and SPARQL endpoints provide various access methods for applications. The data.oceandrilling.org is not viewed as a web site but as an application that communicate with a range of clients. This approach helps guide the development more along software practices than along web site authoring approaches.
Physical exploration for uranium during 1951 in the Silver Reef district, Washington County, Utah
Stugard, Frederick
1954-01-01
During 1951 a joint exploration program of the most promising uraniferous areas in the Silver Reef district was made by the U.S. Geological Survey and the U.S. atomic Energy Commission. A U.S. Bureau of Mines drill crew, on contract to the Atomic Energy Commission, did 2,450 feet of diamond drilling under the geological supervision of the U.S. Geological Survey. The purpose of the drilling was to delineate broadly the favorable ground for commercial development of the uranium deposits. Ten drill holes were located around Pumpkin Point, which is the northeastern end of Buckeye Reef, to probe for extensions of small ore sheets mined on the Point in fine-grained sandstones of the Chinle formation. Three additional holes were located around Tecumseh Hill to probe for extensions of the small showings of uranium-bearing rocks of Buckeye Reef. Only one trace of uranium mineral was detected in the 13 drill holes by logging of drill cores, gamma-ray logging of the holes, and analysis of many core splits from favorable lithology. Extensive traversing with Geiger counters throughout the district and detailed geologic mapping of areas on Buckeye Reef and on East Reef indicate that the chances of discovering significant uranium deposits in the Silver Reef district are very poor, because of: highly variable lithology, closely faulted structure, and obliteration of the shallow uranium-bearing lenses by silver mining. Most of the available ore in the district was in the Pumpkin Point area and has been mined during 1950 to 1953. No ore reserves can be computed for the district before further development work. The most favorable remaining area in the district is now being explored by the operators with Atomic Energy Commission supervision.
ERIC Educational Resources Information Center
Brown, Joseph
2006-01-01
In this article, the author discusses a literature-based character education program at the school district of Hillsborough County in Florida. The district recently developed a comprehensive management plan in response to the much-publicized school violence of recent years. The plan addresses school issues including tornado and fire drills,…
USING THE LANGUAGE LABORATORY.
ERIC Educational Resources Information Center
LADU, TORA TUVE
TO ENCOURAGE UTILIZATION OF THE LANGUAGE LABORATORY AS A TEACHING TECHNIQUE, THIS BULLETIN DESCRIBES SUCH POSSIBLE USES OF THE LABORATORY AS PROGRAMING LESSONS, RECORDING, AND TESTING LANGUAGE SKILL DEVELOPMENT. ONE OF THE MOST IMPORTANT FUNCTIONS OF THE LABORATORY IS THE PATTERN DRILL, DESCRIBED HERE FOR FRENCH, GERMAN, AND SPANISH. EXAMPLES ARE…
Scholastic Aptitude Test Preparation for the Adolescent Dyslexic.
ERIC Educational Resources Information Center
Rothschild, Lois H.
1987-01-01
Scholastic Aptitude Test skills of dyslexics can be enhanced through use of special test administration arrangements and a structured program of vocabulary development, test-taking strategies, and a pattern of analysis to improve reading comprehension. Two case studies illustrate the impact of drill and reinforcement, multimodal imagery…
DAME: planetary-prototype drilling automation.
Glass, B; Cannon, H; Branson, M; Hanagud, S; Paulsen, G
2008-06-01
We describe results from the Drilling Automation for Mars Exploration (DAME) project, including those of the summer 2006 tests from an Arctic analog site. The drill hardware is a hardened, evolved version of the Advanced Deep Drill by Honeybee Robotics. DAME has developed diagnostic and executive software for hands-off surface operations of the evolved version of this drill. The DAME drill automation tested from 2004 through 2006 included adaptively controlled drilling operations and the downhole diagnosis of drilling faults. It also included dynamic recovery capabilities when unexpected failures or drilling conditions were discovered. DAME has developed and tested drill automation software and hardware under stressful operating conditions during its Arctic field testing campaigns at a Mars analog site.
DAME: Planetary-Prototype Drilling Automation
NASA Astrophysics Data System (ADS)
Glass, B.; Cannon, H.; Branson, M.; Hanagud, S.; Paulsen, G.
2008-06-01
We describe results from the Drilling Automation for Mars Exploration (DAME) project, including those of the summer 2006 tests from an Arctic analog site. The drill hardware is a hardened, evolved version of the Advanced Deep Drill by Honeybee Robotics. DAME has developed diagnostic and executive software for hands-off surface operations of the evolved version of this drill. The DAME drill automation tested from 2004 through 2006 included adaptively controlled drilling operations and the downhole diagnosis of drilling faults. It also included dynamic recovery capabilities when unexpected failures or drilling conditions were discovered. DAME has developed and tested drill automation software and hardware under stressful operating conditions during its Arctic field testing campaigns at a Mars analog site.
A computer program for borehole compensation of dual-detector density well logs
Scott, James Henry
1978-01-01
The computer program described in this report was developed for applying a borehole-rugosity and mudcake compensation algorithm to dual-density logs using the following information: the water level in the drill hole, hole diameter (from a caliper log if available, or the nominal drill diameter if not), and the two gamma-ray count rate logs from the near and far detectors of the density probe. The equations that represent the compensation algorithm and the calibration of the two detectors (for converting countrate or density) were derived specifically for a probe manufactured by Comprobe Inc. (5.4 cm O.D. dual-density-caliper); they are not applicable to other probes. However, equivalent calibration and compensation equations can be empirically determined for any other similar two-detector density probes and substituted in the computer program listed in this report. * Use of brand names in this report does not necessarily constitute endorsement by the U.S. Geological Survey.
HIGH-POWER TURBODRILL AND DRILL BIT FOR DRILLING WITH COILED TUBING
DOE Office of Scientific and Technical Information (OSTI.GOV)
Robert Radtke; David Glowka; Man Mohan Rai
2008-03-31
Commercial introduction of Microhole Technology to the gas and oil drilling industry requires an effective downhole drive mechanism which operates efficiently at relatively high RPM and low bit weight for delivering efficient power to the special high RPM drill bit for ensuring both high penetration rate and long bit life. This project entails developing and testing a more efficient 2-7/8 in. diameter Turbodrill and a novel 4-1/8 in. diameter drill bit for drilling with coiled tubing. The high-power Turbodrill were developed to deliver efficient power, and the more durable drill bit employed high-temperature cutters that can more effectively drill hardmore » and abrasive rock. This project teams Schlumberger Smith Neyrfor and Smith Bits, and NASA AMES Research Center with Technology International, Inc (TII), to deliver a downhole, hydraulically-driven power unit, matched with a custom drill bit designed to drill 4-1/8 in. boreholes with a purpose-built coiled tubing rig. The U.S. Department of Energy National Energy Technology Laboratory has funded Technology International Inc. Houston, Texas to develop a higher power Turbodrill and drill bit for use in drilling with a coiled tubing unit. This project entails developing and testing an effective downhole drive mechanism and a novel drill bit for drilling 'microholes' with coiled tubing. The new higher power Turbodrill is shorter, delivers power more efficiently, operates at relatively high revolutions per minute, and requires low weight on bit. The more durable thermally stable diamond drill bit employs high-temperature TSP (thermally stable) diamond cutters that can more effectively drill hard and abrasive rock. Expectations are that widespread adoption of microhole technology could spawn a wave of 'infill development' drilling of wells spaced between existing wells, which could tap potentially billions of barrels of bypassed oil at shallow depths in mature producing areas. At the same time, microhole coiled tube drilling offers the opportunity to dramatically cut producers' exploration risk to a level comparable to that of drilling development wells. Together, such efforts hold great promise for economically recovering a sizeable portion of the estimated remaining shallow (less than 5,000 feet subsurface) oil resource in the United States. The DOE estimates this U.S. targeted shallow resource at 218 billion barrels. Furthermore, the smaller 'footprint' of the lightweight rigs utilized for microhole drilling and the accompanying reduced drilling waste disposal volumes offer the bonus of added environmental benefits. DOE analysis shows that microhole technology has the potential to cut exploratory drilling costs by at least a third and to slash development drilling costs in half.« less
Geomechanical Engineering Concepts Applied to Deep Borehole Disposal Wells
NASA Astrophysics Data System (ADS)
Herrick, C. G.; Haimson, B. C.; Lee, M.
2015-12-01
Deep borehole disposal (DBD) of certain defense-generated radioactive waste forms is being considered by the US Department of Energy (DOE) as an alternative to mined repositories. The 17 inch diameter vertical boreholes are planned to be drilled in crystalline basement rock. As part of an initial field test program, the DOE will drill a demonstration borehole, to be used to test equipment for handling and emplacing prototype nonradioactive waste containers, and a second smaller diameter borehole, to be used for site characterization. Both boreholes will be drilled to a depth of 5 km. Construction of such boreholes is expected to be complex because of their overall length, large diameter, and anticipated downhole conditions of high temperatures, pore pressures, and stress regimes. It is believed that successful development of DBD boreholes can only be accomplished if geologic and tectonic conditions are characterized and drill activities are designed based on that understanding. Our study focuses primarily on using the in situ state of stress to mitigate borehole wall failure, whether tensile or compressive. The measured stresses, or their constrained estimates, will include pore pressure, the vertical stress, the horizontal stresses and orientations, and thermally induced stresses. Pore pressure will be measured directly or indirectly. Horizontal stresses will be estimated from hydraulic fracturing tests, leak off tests, and breakout characteristics. Understanding the site stress condition along with the rock's strength characteristics will aid in the optimization of mud weight and casing design required to control borehole wall failure and other drilling problems.Sandia National Laboratories is a multi-program laboratory managed and operated by Sandia Corporation, a wholly owned subsidiary of Lockheed Martin Corporation, for the U.S. Department of Energy's National Nuclear Security Administration under contract DE-AC04-94AL85000. SAND2015-6552A
NASA Astrophysics Data System (ADS)
Abratis, Michael; Methe, Pascal; Aehnelt, Michaela; Kunkel, Cindy; Beyer, Daniel; Kukowski, Nina; Totsche, Kai Uwe
2014-05-01
Deep drilling of the central Thuringian Syncline was carried out in order to gather substantial knowledge of subsurface fluid dynamics and fluid rock interaction within a sedimentary basin. The final depth of the borehole was successfully reached at 1179 m, just a few meters above the Buntsandstein - Zechstein boundary. One of the aspects of the scientific drilling was obtaining sample material from different stratigraphic units for insights in genesis, rock properties and fluid-rock interactions. Parts of the section were cored whereas cuttings provide record of the remaining units. Coring was conducted in aquifers and their surrounding aquitards, i.e. parts of the Upper Muschelkalk (Trochitenkalk), the Middle Muschelkalk, the Upper Buntsandstein (Pelitrot and Salinarrot) and the Middle Buntsandstein. In advance and in cooperation with the GFZ Potsdam team "Scientific Drilling" core handling was discussed and a workflow was developed to ensure efficient and appropriate processing of the valuable core material and related data. Core curation including cleaning, fitting, marking, measuring, cutting, boxing, photographing and unrolled scanning using a DMT core scanner was carried out on the drilling site in Erfurt. Due care was exercised on samples for microbiological analyses. These delicate samples were immediately cut when leaving the core tube and stored within a cooling box at -78°C. Special software for data input was used developed by smartcube GmbH. Advantages of this drilling information system (DIS) are the compatibility with formats of international drilling projects from the IODP and ICDP drilling programs and thus options for exchanges with the international data bases. In a following step, the drill cores were brought to the national core repository of the BGR in Berlin Spandau where the cores were logged for their physical rock properties using a GeoTek multi sensor core logger (MSCL). After splitting the cores into a working and archive half, the cores were scanned for compositional variations using an XRF core scanner at the BGR lab and scan images of the slabbed surfaces were performed. The average core recovery rate was very high at nearly 100%. Altogether, we gained 533 m of excellent core material including sandstones, siltstones and claystones, carbonates, sulfates and chlorides. This provides valuable insight into the stratigraphic column of the Thuringian Syncline.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Arnis Judzis
2003-01-01
This document details the progress to date on the ''OPTIMIZATION OF MUD HAMMER DRILLING PERFORMANCE -- A PROGRAM TO BENCHMARK THE VIABILITY OF ADVANCED MUD HAMMER DRILLING'' contract for the quarter starting October 2002 through December 2002. Even though we are awaiting the optimization portion of the testing program, accomplishments included the following: (1) Smith International participated in the DOE Mud Hammer program through full scale benchmarking testing during the week of 4 November 2003. (2) TerraTek acknowledges Smith International, BP America, PDVSA, and ConocoPhillips for cost-sharing the Smith benchmarking tests allowing extension of the contract to add to themore » benchmarking testing program. (3) Following the benchmark testing of the Smith International hammer, representatives from DOE/NETL, TerraTek, Smith International and PDVSA met at TerraTek in Salt Lake City to review observations, performance and views on the optimization step for 2003. (4) The December 2002 issue of Journal of Petroleum Technology (Society of Petroleum Engineers) highlighted the DOE fluid hammer testing program and reviewed last years paper on the benchmark performance of the SDS Digger and Novatek hammers. (5) TerraTek's Sid Green presented a technical review for DOE/NETL personnel in Morgantown on ''Impact Rock Breakage'' and its importance on improving fluid hammer performance. Much discussion has taken place on the issues surrounding mud hammer performance at depth conditions.« less
Bothner, Michael H.; Rendigs, R. R.; Campbell, Esma; Doughten, M.W.; Parmenter, C.M.; O'Dell, C. H.; DiLisio, G.P.; Johnson, R.G.; Gillison, J.R.; Rait, Norma
1986-01-01
Of the 12 elements analyzed in bulk (undifferentiated) sediments collected adjacent to drilling rigs on Georges Bank, only barium was found to increase in concentration during the period when eight exploratory wells were drilled (July 1981 until September 1982). The maximum postdrilling concentration of barium (a major element in drilling mud) reached 172 ppm in bulk sediments near the drill site in block 410. This concentration is higher than the predrilling concentration at this location by a factor of 5.9. This maximum barium concentration is within the range of predrilling concentrations (28-300 ppm) measured in various sediment types from the regional stations of this program. No drilling-related changes in the concentrations of the 11 other metals have been observed in bulk sediments at any of the locations sampled in this program. We estimate that about 25 percent of the barite discharged at block 312 was present in the sediments within 6 km of the rig, 4 weeks after drilling was completed at this location (drilling period was December 8, 1981-June 27, 1982). For almost a year following completion of this well, the inventory of barite decreased rapidly, with a half-life of 0.34 year. During the next year, the inventory decreased at a slower rate (half-life of 3.4 years). The faster rate probably reflects resuspension and sediment transport of bariterich material residing at the sediment surface. Elevated barium concentrations in post-drilling sediment-trap samples from block 312 indicate that such resuspension can occur up to at least 25 m above the sea floor. As the remaining barite particles are reworked deeper into the sediments by currents and bioturbation, removal by sediment-transport processes is slower. The barite discharged during the exploratory phase of drilling is associated with the fine fraction of sediment and is widely distributed around the bank. We found evidence for barium transport to Great South Channel, 115 km west of the drilling, and to stations 2 and 3, 35 km east of the easternmost drilling site. Small increases in barium concentrations, present in the fine fraction of sediment only, were measured also at the heads of both Lydonia and Oceanographer Canyons, located 8 and 39 km, respectively, seaward of the nearest exploratory well.
Compact drilling and sample system
NASA Technical Reports Server (NTRS)
Gillis-Smith, Greg R.; Petercsak, Doug
1998-01-01
The Compact Drilling and Sample System (CDSS) was developed to drill into terrestrial, cometary, and asteroid material in a cryogenic, vacuum environment in order to acquire subsurface samples. Although drills were used by the Apollo astronauts some 20 years ago, this drill is a fraction of the mass and power and operates completely autonomously, able to drill, acquire, transport, dock, and release sample containers in science instruments. The CDSS has incorporated into its control system the ability to gather science data about the material being drilled by measuring drilling rate per force applied and torque. This drill will be able to optimize rotation and thrust in order to achieve the highest drilling rate possible in any given sample. The drill can be commanded to drill at a specified force, so that force imparted on the rover or lander is limited. This paper will discuss the cryo dc brush motors, carbide gears, cryogenic lubrication, quick-release interchangeable sampling drill bits, percussion drilling and the control system developed to achieve autonomous, cryogenic, vacuum, lightweight drilling.
Robert G. Hooper; William E. Taylor; Susan C. Loeb
2004-01-01
Between 1990 and 1992 an extensive artificial cavity installation program was conducted on the Francis Marion National Forest (FMNF) in coastal South Carolina where Hurricane Hugo had caused vast devastation. Four artificial cavity types were installed: drilled starts, drilled cavities, modified drilled cavities, and inserts. In 1998, we examined 443 of the artificial...
30 CFR 250.415 - What must my casing and cementing programs include?
Code of Federal Regulations, 2013 CFR
2013-07-01
..., DEPARTMENT OF THE INTERIOR OFFSHORE OIL AND GAS AND SULPHUR OPERATIONS IN THE OUTER CONTINENTAL SHELF Oil and Gas Drilling Operations Applying for A Permit to Drill § 250.415 What must my casing and cementing... in Deep Water Wells (as incorporated by reference in § 250.198), if you drill a well in water depths...
30 CFR 250.411 - What information must I submit with my application?
Code of Federal Regulations, 2012 CFR
2012-07-01
..., DEPARTMENT OF THE INTERIOR OFFSHORE OIL AND GAS AND SULPHUR OPERATIONS IN THE OUTER CONTINENTAL SHELF Oil and Gas Drilling Operations Applying for A Permit to Drill § 250.411 What information must I submit with... proposed well § 250.413 (c) Drilling prognosis § 250.414 (d) Casing and cementing programs § 250.415 (e...
30 CFR 250.415 - What must my casing and cementing programs include?
Code of Federal Regulations, 2014 CFR
2014-07-01
..., DEPARTMENT OF THE INTERIOR OFFSHORE OIL AND GAS AND SULPHUR OPERATIONS IN THE OUTER CONTINENTAL SHELF Oil and Gas Drilling Operations Applying for A Permit to Drill § 250.415 What must my casing and cementing... in Deep Water Wells (as incorporated by reference in § 250.198), if you drill a well in water depths...
30 CFR 250.411 - What information must I submit with my application?
Code of Federal Regulations, 2014 CFR
2014-07-01
..., DEPARTMENT OF THE INTERIOR OFFSHORE OIL AND GAS AND SULPHUR OPERATIONS IN THE OUTER CONTINENTAL SHELF Oil and Gas Drilling Operations Applying for A Permit to Drill § 250.411 What information must I submit with... proposed well § 250.413 (c) Drilling prognosis § 250.414 (d) Casing and cementing programs § 250.415 (e...
30 CFR 250.411 - What information must I submit with my application?
Code of Federal Regulations, 2013 CFR
2013-07-01
..., DEPARTMENT OF THE INTERIOR OFFSHORE OIL AND GAS AND SULPHUR OPERATIONS IN THE OUTER CONTINENTAL SHELF Oil and Gas Drilling Operations Applying for A Permit to Drill § 250.411 What information must I submit with... proposed well § 250.413 (c) Drilling prognosis § 250.414 (d) Casing and cementing programs § 250.415 (e...
30 CFR 250.415 - What must my casing and cementing programs include?
Code of Federal Regulations, 2012 CFR
2012-07-01
..., DEPARTMENT OF THE INTERIOR OFFSHORE OIL AND GAS AND SULPHUR OPERATIONS IN THE OUTER CONTINENTAL SHELF Oil and Gas Drilling Operations Applying for A Permit to Drill § 250.415 What must my casing and cementing... in Deep Water Wells (as incorporated by reference in § 250.198), if you drill a well in water depths...
Environmental concerns and future oil and gas developments in Coastal Wetlands of Louisiana
DOE Office of Scientific and Technical Information (OSTI.GOV)
John, C.J.; Harder, B.J.; Groat, C.G.
1993-09-01
Recent studies have confirmed that much oil and natural gas have been overlooked and increases in future recoverable reserves will come from drilling in these areas. Increased production will result from identifying unexploited compartmentalized reservoirs, new infield reservoirs, and bypassed reservoirs, and by using enhanced recovery technologies for hydrocarbon recovery in incompletely drained reservoirs previously left unproduced for economic reasons. Most of southern Louisiana's hydrocarbon reserves underlie coastal wetland areas of the state. Major environmental concerns associated with the future development of existing reserves are canal dredging and destruction of wildlife habitat, use and disposal of oil-based muds, mitigation formore » wetland damage, and the recent emerging issue of surface contamination by naturally occurring radioactive materials with potential liabilities and future remedial regulation. To reduce wetland environmental damage caused by access canals to drilling sites, the Coastal Management Division of the Louisiana Department of Natural Resources instituted a geologic reviews program to review drilling permit application in the coastal wetlands. This process provides a mechanism for state and federal agencies to comment on the requested drilling permit. As a result of this process, the total average wetland disturbed area has been reduced from 767 ac per year in 1982 to approximately 76 ac per year in 1991. Average lengths of access canals also have been reduced by approximately 78% during the period. Oil and gas companies are becoming increasingly aware of the environmental consequences of drilling in wetlands and are considering them in planning for development activities. In the current climate of increasing public consciousness about the environment, addressing environmental concerns in the planning state will go a long way in helping alleviate future environmental problems.« less
Advancing Understanding of Earthquakes by Drilling an Eroding Convergent Margin
NASA Astrophysics Data System (ADS)
von Huene, R.; Vannucchi, P.; Ranero, C. R.
2010-12-01
A program of IODP with great societal relevance is sampling and instrumenting the seismogenic zone. The zone generates great earthquakes that trigger tsunamis, and submarine slides thereby endangering coastal communities containing over sixty percent of the earth’s population. To asses and mitigate this endangerment it is urgent to advance understanding of fault dynamics that allows more timely anticipation of hazardous seismicity. Seismogenesis on accreting and eroding convergent plate boundaries apparently differ because of dissimilar materials along the interplate fault. As the history of instrumentally recorded earthquakes expands the difference becomes clearer. The more homogeneous clay, silt and sand subducted at accreting margins is associated with great earthquakes (M 9) whereas the fragmented upper plate rock that can dominate subducted material along an eroding margin plate interface is associated with many tsunamigenic earthquakes (Bilek, 2010). Few areas have been identified where the seismogenic zone can be reached with scientific drilling. In IODP accreting margins are studied on the NanTroSeize drill transect off Japan where the ultimate drilling of the seismogenic interface may occur by the end of IODP. The eroding Costa Rica margin will be studied in CRISP where a drill program will begin in 2011. The Costa Rican geophysical site survey will be complete with acquisition and processing of 3D seismic data in 2011 but the entire drilling will not be accomplished in IODP. It is appropriate that the accreting margin study be accomplished soon considering the indications of a pending great earthquake that will affect a country that has devoted enormous resources to IODP. However, understanding the erosional end-member is scientifically as important to an understanding of fault mechanics. Transoceanic tsunamis affect the entire Pacific rim where most subduction zones are eroding margins. The Costa Rican subduction zone is less complex operationally and perhaps geologically than the Nankai margin. The developing Central American countries do not have the resources to contribute to IODP but this should not deter acquiring the scientific insights proposed in CRISP considering the broader scientific benefits. Such benefits include the first sampling and instrumentation of an actively eroding plate interface and drilling near or into an earthquake asperity. Drilling an eroding margin should significantly advance understanding of subduction zone fault mechanisms and help improve assessment of future hazardous earthquakes and tsunamis.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Gordon Tibbitts; Arnis Judzis
2002-04-01
This document details the progress to date on the OPTIMIZATION OF MUD HAMMER DRILLING PERFORMANCE--A PROGRAM TO BENCHMARK THE VIABILITY OF ADVANCED MUD HAMMER DRILLING contract for the quarter starting January 2002 through March 2002. Accomplishments include the following: In accordance to Task 7.0 (D. No.2 Technical Publications) TerraTek, NETL, and the Industry Contributors successfully presented a paper detailing Phase 1 testing results at the February 2002 IADC/SPE Drilling Conference, a prestigious venue for presenting DOE and private sector drilling technology advances. The full reference is as follows: (1) IADC/SPE 74540 ''World's First Benchmarking of Drilling Mud Hammer Performance atmore » Depth Conditions'' authored by Gordon A. Tibbitts, TerraTek; Roy C. Long, US Department of Energy, Brian E. Miller, BP America, Inc.; Arnis Judzis, TerraTek; and Alan D. Black, TerraTek. Gordon Tibbitts, TerraTek, will presented the well-attended paper in February of 2002. The full text of the Mud Hammer paper was included in the last quarterly report. (2) The Phase 2 project planning meeting (Task 6) was held at ExxonMobil's Houston Greenspoint offices on February 22, 2002. In attendance were representatives from TerraTek, DOE, BP, ExxonMobil, PDVSA, Novatek, and SDS Digger Tools. (3) PDVSA has joined the advisory board to this DOE mud hammer project. PDVSA's commitment of cash and in-kind contributions were reported during the last quarter. (4) Strong Industry support remains for the DOE project. Both Andergauge and Smith Tools have expressed an interest in participating in the ''optimization'' phase of the program. The potential for increased testing with additional Industry cash support was discussed at the planning meeting in February 2002.« less
Math Activities Using LogoWriter--Investigations.
ERIC Educational Resources Information Center
Flewelling, Gary
This book is one in a series of teacher resource books developed to: (1) rescue students from the clutches of computers that drill and control; and (2) supply teachers with computer activities compatible with a mathematics program that emphasizes investigation, problem solving, creativity, and hypothesis making and testing. This is not a book…
Computer Assisted Learning in Numeracy.
ERIC Educational Resources Information Center
Hollin, Freda
Computer-assisted learning in numeracy for adults is far less developed than computer-assisted learning in literacy. Although a great many software programs exist, few are suitable for adults and many offer only drill and practice exercises instead of teaching genuine computer skills. One approach instructors can take is to have their students use…
Exploring the Oceans With OOI and IODP: A New Partnership in Education and Outreach
NASA Astrophysics Data System (ADS)
Gröschel, H.; Robigou, V.; Whitman, J.; Jagoda, S. K.; Randle, D.
2003-12-01
The Ocean Observatories Initiative (OOI), a new program supported by the National Science Foundation (NSF), will investigate ocean and Earth processes using deep-sea and coastal observatories, as well as a lithospheric plate-scale cabled observatory that spans most of the geological and oceanographic processes of our planet. October 2003 marked the beginning of the Integrated Ocean Drilling Program (IODP), the third phase of a scientific ocean drilling effort known for its international cooperation, multidisciplinary research, and technological innovation. A workshop exploring the scientific, technical, and educational linkages between OOI and IODP was held in July 2003. Four scientific thematic groups discussed and prioritized common goals of the two programs, and identified experiments and technologies needed to achieve these objectives. The Education and Outreach (E&O) group attended the science sessions and presented seed ideas on activities for all participants to discuss and evaluate. A multidisciplinary dialogue between E&O facilitators, research scientists, and technology specialists was initiated. OOI/IODP participants support the recommendation of the IODP Education Workshop (May 2003) that the IODP and US Science Support Program (USSSP)-successor program have clear commitments to education and outreach. Specific organizational recommendations for OOI/IODP are: (1) E&O should have equal status with science and engineering in the OOI management/planning structure, and enjoy adequate staffing at a US program office; (2) an E&O Advisory Committee of scientists, engineers, technology experts, and educators should be established to develop and implement a viable, vibrant E&O plan; (3) E&O staff and advisors should (a) provide assistance to researchers in fulfilling E&O proposal requirements from preparation to review stages, (b) promote submittal of proposals to government agencies specifically for OOI/IODP-related E&O activities, and (c) identify and foster partners, networks, and funding opportunities. Specific E&O strategies include: (1) present observatory science and ocean drilling content, and the sense of discovery and international cooperation unique to OOI/IODP, to a broad audience; (2) develop and maintain an effective website with distinct resources for K-20 educators, students, and the public; (3) provide pre-service, in-service, and in-residence programs for K-12 teachers that are synergistic with national and local education standards; (4) focus K-12 education efforts on middle school students in grades 5-8; (5) continue and expand existing, successful Ocean Drilling Program activities for undergraduate and graduate students and educators; and (6) try to avoid redundancy with existing E&O efforts within the ocean sciences community by adopting successful models and exploring partnership opportunities with other NSF-funded ocean science education centers and initiatives.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Thompson, J.L.; Hawkins, W.L.; Mathews, M.
This report describes research done at Los Alamos in FY 1993 for the Hydrologic Resources Management Program. The US Department of Energy funds this research through two programs at the Nevada Test Site (NTS): defense and groundwater characterization. Los Alamos personnel have continued to study the high-pressure zone created in the aquifer under Yucca Flat. We analyzed data from a hole in this area (U-7cd) and drilled another hole and installed a water monitoring tube at U-4t. We analyzed water from a number of locations on the NTS where we know there are radionuclides in the groundwater and critiqued themore » effectiveness of this monitoring effort. Our program for analyzing postshot debris continued with material from the last nuclear test in September 1992. We supported both the defense program and the groundwater characterization program by analyzing water samples from their wells and by reviewing documents pertaining to future drilling. We helped develop the analytical methodology to be applied to water samples obtained in the environmental restoration and waste management efforts at the NTS. Los Alamos involvement in the Hydrologic Resources Management Program is reflected in the appended list of documents reviewed, presentations given, papers published, and meetings attended.« less
Venezuela offshore oil and gas production development: Past, present and future
DOE Office of Scientific and Technical Information (OSTI.GOV)
Perez La Salvia, H.; Schwartz, E.; Contreras, M.
1995-12-01
This paper presents a short history of offshore oil and gas production in Venezuela starting in Lake Maracaibo in 1923. The main emphasis has been the results of the recent R and D and the exploratory offshore programs in areas like Orinoco Delta located in the Atlantic Ocean, Northeast and Northwest Venezuela in the Caribbean sea. In the R and D offshore program the main objectives were: (1) To establish the local environmental, oceanographical, geotechnical and seismicity conditions for the Venezuelan Continental Platform. (2) To give a technical support to the PDVSA Operating Affiliates during the exploratory programs including: (a)more » to develop accurate drilling vessel positioning systems; (b) evaluation of sea bottom geotechnical conditions for safely operating the jack-ups and drilling vessels involved in the exploratory wells and (c) to identify those areas which because of their special nature require further investigation to establish preliminary type of platforms required for the areas to be developed or to evaluate other solutions proposed by Foreign Consultant Engineering Companies to the PDVSA Operating Affiliated Companies. The main objective of PDVSA for the coming future will be to develop the North of Paria Gas Field through the initially named Christopher Columbus Project now Sucre Gas, S.A., a consortium conformed by LaGoven, S.A. Shell, Exxon and Mitsubishi. objective of this paper is to give an idea of the history of the Venezuelan Oil and Gas Offshore development giving emphasis to the results of the INTEVEP S.A. Red offshore program and to show some results of the particular characteristics of oceanographical, environmental, geotechnical and seismic conditions in the main areas evaluated during the exploratory program: Orinoco Delta, Gulf of Paria and North of Paria.« less
Hochscheidt, Celso João; Shimizu, Roberto Hideo; Andrighetto, Augusto Ricardo; Pierezan, Rodrigo; Thomé, Geninho; Salatti, Rafael
2017-10-01
This study evaluated cutting efficiency (CE) and linear wear of dental implant drills after 450 standardized osteotomies on bovine ribs. Diamond-like carbon-coated steel drills (SG), acid-treated steel drills (EG), and ceramic drills (ZG) were divided into 6 subgroups according to the number of uses. A robot-controlled program performed systematic instrumentation, timing, axial loading, and managed feed rate. CE was recorded in a polyurethane resin blank and end wear (VBBmax) was analyzed under stereo microscopy. After osteotomies in beef ribs, CE for the Ø2.0-mm drill decreased 10.2% in SG and 10.9% in ZG; for the Ø3.0-mm drill, CE decreased 30.6% in SG, 8.5% in ZG, and improved in EG. The greatest wear occurred in Ø2.0-mm drills; ZG drills (Ø3.0 mm) exhibited only edge frittering, as confirmed on scanning electron microscopy. After 50 exposures to mechanical loads, steel and ceramic drills lost CE. Whereas cutting and thermal performance improved in experimental drills, the Ø2.0-mm drill exhibited the most signs of wear proportional to use. These findings suggest that, with the methodology employed, the life of these drills exceeds 50 osteotomies.
Ocean Drilling Program: Science Operator Site Index
time estimator Long-Term Observatories and Legacy Holes (University of Miami site) Drilling Services systems Internet systems Help Desk Database services How to obtain ODP data Data types and examples Core
Ocean Drilling Program: Science Operator Search Engine
and products Drilling services and tools Online Janus database Search the ODP/TAMU web site ODP's main -USIO site, plus IODP, ODP, and DSDP Publications, together or separately. ODP | Search | Database
Beowawe Geothermal Area evaluation program. Final report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Iovenitti, J. L
Several exploration programs were conducted at the Beowawe Geothermal Prospect, Lander and Eureka County, Nevada. Part I, consisting of a shallow temperature hole program, a mercury soil sampling survey, and a self-potential survey were conducted in order to select the optimum site for an exploratory well. Part II consisted of drilling a 5927-foot exploratory well, running geophysical logs, conducting a drill stem test (2937-3208 feet), and a short-term (3-day) flow test (1655-2188 feet). All basic data collected is summarized.
NASA Astrophysics Data System (ADS)
Fucugauchi, J. U.; Perez-Cruz, L. L.; Velasco-Villarreal, M.
2013-12-01
Drilling projects of impact structures provide data on the structure and stratigraphy of target, impact and post-impact lithologies, providing insight on the impact dynamics and cratering. Studies have successfully included magnetic well logging and analyses in core and cuttings, directed to characterize the subsurface stratigraphy and structure at depth. There are 170-180 impact craters documented in the terrestrial record, which is a small proportion compared to expectations derived from what is observed on the Moon, Mars and other bodies of the solar system. Knowledge of the internal 3-D deep structure of craters, critical for understanding impacts and crater formation, can best be studied by geophysics and drilling. On Earth, few craters have yet been investigated by drilling. Craters have been drilled as part of industry surveys and/or academic projects, including notably Chicxulub, Sudbury, Ries, Vredefort, Manson and many other craters. As part of the Continental ICDP program, drilling projects have been conducted on the Chicxulub, Bosumtwi, Chesapeake, Ries and El gygytgyn craters. Inclusion of continuous core recovery expanded the range of paleomagnetic and rock magnetic applications, with direct core laboratory measurements, which are part of the tools available in the ocean and continental drilling programs. Drilling studies are here briefly reviewed, with emphasis on the Chicxulub crater formed by an asteroid impact 66 Ma ago at the Cretaceous/Paleogene boundary. Chicxulub crater has no surface expression, covered by a kilometer of Cenozoic sediments, thus making drilling an essential tool. As part of our studies we have drilled eleven wells with continuous core recovery. Magnetic susceptibility logging, magnetostratigraphic, rock magnetic and fabric studies have been carried out and results used for lateral correlation, dating, formation evaluation, azimuthal core orientation and physical property contrasts. Contributions of magnetic studies on impact age, cratering, target-impactite stratigraphy, ejecta, impact dynamics, hydrothermal alterations and post-impact processes are presented. The challenges and perspectives of drilling studies of impact craters are discussed.
NASA Astrophysics Data System (ADS)
Fucugauchi, J. U.; Velasco-Villarreal, M.; Perez-Cruz, L. L.
2013-05-01
Paleomagnetic studies have long been successfully carried out in drilling projects, to characterize the borehole columns and to investigate the subsurface structure and stratigraphy. Magnetic susceptibility logging and magnetostratigraphic studies provide data for lateral correlation, formation evaluation, azimuthal core orientation, physical properties, etc., and are part of the tools available in the ocean and continental drilling programs. The inclusion of continuous core recovery in scientific drilling projects have greatly expanded the range of potential applications of paleomagnetic and rock magnetic studies, by allowing laboratory measurements on core samples. For this presentation, we concentrate on drilling studies of impact structures and their usefulness for documenting the structure, stratigraphy and physical properties at depth. There are about 170-180 impact craters documented in the terrestrial record, which is a small number compared to what is observed in the Moon, Mars, Venus and other bodies of the solar system. Of the terrestrial impact craters, only a few have been studied by drilling. Some craters have been drilled as part of industry exploration surveys and/or academic projects, including notably the Sudbury, Ries, Vredefort, Manson and many other craters. As part of the Continental ICDP program, drilling projects have been conducted on the Chicxulub, Bosumtwi, Chesapeake and El gygytgyn craters. Drilling of terrestrial craters has proved important in documenting the shallow stratigraphy and structure, providing insight on the cratering and impact dynamics. Questions include several that can only be addressed by retrieving core samples and laboratory analyses. Paleomagnetic, rock magnetic and fabric studies have been conducted in the various craters, which are here summarized with emphasis on the Chicxulub crater and Yucatan carbonate platform. Chicxulub is buried under a kilometer of younger sediments, making drilling an essential tool. Oil exploration included several boreholes, and additionally we have drilled 11 boreholes with continuous core recovery. Contributions and limitations of paleomagnetism for investigating the impact age, crater stratigraphy, cratering, ejecta emplacement, impact dynamics, hydrothermal system and post-impact processes are discussed.
NASA Astrophysics Data System (ADS)
Bai, Y.; Jia, Z. Y.; Wang, F. J.; Fu, R.; Guo, H. B.; Cheng, D.; Zhang, B. Y.
2017-06-01
Drilling is inevitable for CFRP components’ assembling process in the aviation industry. The exit damage frequently occurs and affects the load carrying capacity of components. Consequently, it is of great urgency to enhance drilling exit quality on CFRP components. The article aims to guide the reasonable choice of drill helical direction and effectively reduce exit damage. Exit observation experiments are carried out with left-hand helical, right-hand helical and straight one-shot drill drilling T800S CFRP laminates separately. The development rules of exit damage and delamination factor curves are obtained. Combined with loading conditions and fracture modes of push-out burrs, and thrust force curves, the influence of drill helical direction on exit damage development is derived. It is found that the main fracture modes for left-hand helical, right-hand helical, and straight one-shot drill are mode I, extrusive fracture, mode III respectively. Among them, mode III has the least effect on exit damage development. Meanwhile, the changing rate of thrust force is relative slow for right-hand helical and straight one-shot drill in the thrust force increasing phase of stage II, which is disadvantaged for exit damage development. Therefore, straight one-shot drill’s exit quality is the best.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Kunze, J.F.; Marlor, J.K.
1982-08-01
A competitive aware for a cost sharing program was made to Madison County, Idaho to share in a program to develop moderate-to-low temperature geothermal energy for the heating of a large junior college, business building, public shcools and other large buildings in Rexburg, Idaho. A 3943 ft deep well was drilled at the edge of Rexburg in a region that had been probed by some shallower test holes. Temperatures measured near the 4000 ft depth were far below what was expected or needed, and drilling was abandoned at that depth. In 1981 attempts were made to restrict downward circulation intomore » the well, but the results of this effort yielded no higher temperatures. The well is a prolific producer of 70/sup 0/F water, and could be used as a domestic water well.« less
Comparison of early exploration at Platanares (Honduras) and Wairakei (New Zealand)
Truesdell, A.H.; Glover, R.B.; Janik, C.J.; Brown, K.L.; Goff, F.
1989-01-01
Early exploration at Wairakei, New Zealand, is compared with the present state of exploration of Platanares, Honduras. In retrospect, geothermometer temperatures favor Platanares (e.g., 220 vs. 190??C for Na-K-Ca), but two 600-m drill holes encountered lower temperatures (160??C). Wairakei, explored before the advent of chemical geothermometry, also had disappointing early drilling results (but better than Platanares; one of the first six holes hit T > 180??C). The Wairakei drilling program was nevertheless continued at full speed and by well 20 a successful drilling strategy was discovered.
26 CFR 1.263(c)-1 - Intangible drilling and development costs in the case of oil and gas wells.
Code of Federal Regulations, 2014 CFR
2014-04-01
... § 1.263(c)-1 Intangible drilling and development costs in the case of oil and gas wells. For rules relating to the option to deduct as expenses intangible drilling and development costs in the case of oil... 26 Internal Revenue 3 2014-04-01 2014-04-01 false Intangible drilling and development costs in the...
26 CFR 1.263(c)-1 - Intangible drilling and development costs in the case of oil and gas wells.
Code of Federal Regulations, 2013 CFR
2013-04-01
... § 1.263(c)-1 Intangible drilling and development costs in the case of oil and gas wells. For rules relating to the option to deduct as expenses intangible drilling and development costs in the case of oil... 26 Internal Revenue 3 2013-04-01 2013-04-01 false Intangible drilling and development costs in the...
26 CFR 1.263(c)-1 - Intangible drilling and development costs in the case of oil and gas wells.
Code of Federal Regulations, 2011 CFR
2011-04-01
... § 1.263(c)-1 Intangible drilling and development costs in the case of oil and gas wells. For rules relating to the option to deduct as expenses intangible drilling and development costs in the case of oil... 26 Internal Revenue 3 2011-04-01 2011-04-01 false Intangible drilling and development costs in the...
26 CFR 1.263(c)-1 - Intangible drilling and development costs in the case of oil and gas wells.
Code of Federal Regulations, 2010 CFR
2010-04-01
... Intangible drilling and development costs in the case of oil and gas wells. For rules relating to the option to deduct as expenses intangible drilling and development costs in the case of oil and gas wells, see... 26 Internal Revenue 3 2010-04-01 2010-04-01 false Intangible drilling and development costs in the...
26 CFR 1.263(c)-1 - Intangible drilling and development costs in the case of oil and gas wells.
Code of Federal Regulations, 2012 CFR
2012-04-01
... § 1.263(c)-1 Intangible drilling and development costs in the case of oil and gas wells. For rules relating to the option to deduct as expenses intangible drilling and development costs in the case of oil... 26 Internal Revenue 3 2012-04-01 2012-04-01 false Intangible drilling and development costs in the...
The Future of Deep-Ocean Drilling
ERIC Educational Resources Information Center
Heirtzler, J. R.; Maxwell, A. E.
1978-01-01
Describes the scientific accomplishments of the International Program of Ocean Drilling (IPOD) during its first decade. Notable are the scientific contributions to understanding the sea floor. Critical decisions for the second decade include economic and social implications. (MA)
30 CFR 250.1617 - Application for permit to drill.
Code of Federal Regulations, 2010 CFR
2010-07-01
... BOP equipment, (ii) A schematic drawing of the diverter system to be used (plan and elevation views... survey program for directionally drilled wells; (9) An H2S Contingency Plan, if applicable, and if not...
NASA Astrophysics Data System (ADS)
Freudenthal, Tim; Bergenthal, Markus; Bohrmann, Gerhard; Pape, Thomas; Kopf, Achim; Huhn-Frehers, Katrin; Gohl, Karsten; Wefer, Gerold
2017-04-01
The MARUM-MeBo (abbreviation for Meeresboden-Bohrgerät, the German expression for seafloor drill rig) is a robotic drilling system that is developed since 2004 at the MARUM Center for Marine Environmental Sciences at the University of Bremen in close cooperation with Bauer Maschinen GmbH and other industry partners. The MARUM-MeBo drill rigs can be deployed from multipurpose research vessel like, RV MARIA S. MERIAN, RV METEOR, RV SONNE and RV POLARSTERN and are used for getting long cores both in soft sediments as well as hard rocks in the deep sea. The first generation drill rig, the MARUM-MeBo70 is dedicated for a drilling depth of more than 70 m (Freudenthal and Wefer, 2013). Between 2005 and 2016 it was deployed on 17 research expeditions and drilled about 3 km into different types of geology including carbonate and crystalline rocks, gas hydrates, glacial tills, sands and gravel, glacial till and hemipelagic mud with an average recovery rate of about 70 %. We used the development and operational experiences of MARUM-MeBo70 for the development of a second generation drill rig MARUM-MeBo200. This drill rig is dedicated for conducting core drilling down to 200 m below sea floor. After successful sea trials in the North Sea in October 2014 the MeBo200 was used on a scientific expedition on the research vessel RV SONNE (SO247) in March/April 2016. During 12 deployments we drilled altogether 514 m in hemipelagic sediments with volcanic ashes as well as in muddy and sandy slide deposits off New Zealand. The average core recovery was about 54%. The maximum drilling depth was 105 m below sea floor. Developments for the MeBo drilling technology include the development of a pressure core barrel that was successfully deployed on two research expeditions so far. Bore hole logging adds to the coring capacity. Several autonomous logging probes have been developed in the last years for a deployment with MeBo in the logging while tripping mode - a sonic probe measuring in situ p-wave velocity being the latest development. Various bore hole monitoring systems where developed and deployed with the MeBo system. They allow for long-term monitoring of pressure variability within the sealed bore holes. References: Freudenthal, T and Wefer, G (2013) Drilling cores on the sea floor with the remote-controlled sea floor drilling rig MeBo. Geoscientific Instrumentation, Methods and Data Systems, 2(2). 329-337. doi:10.5194/gi-2-329-2013
Elf cites 5 advantages of horizontal drilling
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1984-06-01
ELF Aquitaine used horizontal drilling during a pilot test program to bring commercial production from its Rospo Mare oil discovery in the Adriatic, which would have been a costly disappointment if drilled by a conventional vertical well bore. Rospo Mare is a large reservoir containing a top column of highly viscous crude underlain by a water column. The company felt that a well bore that penetrated the reservoir vertically would bring early flooding of the oil column and yield only water. By penetrating the reservoir with a horizontal well drilled high in the oil column, the well successfully produced onmore » numerous tests from Oct. 1982 until the end of the test program in 1983. Production was termed excellent, with productivity during tests reportedly reaching ca 15 times the rate produced from nearby vertical wells. However, ELF said the results usually average ca 5 times the usual rate of vertical wells.« less
Devil is in the details: Using logic models to investigate program process.
Peyton, David J; Scicchitano, Michael
2017-12-01
Theory-based logic models are commonly developed as part of requirements for grant funding. As a tool to communicate complex social programs, theory based logic models are an effective visual communication. However, after initial development, theory based logic models are often abandoned and remain in their initial form despite changes in the program process. This paper examines the potential benefits of committing time and resources to revising the initial theory driven logic model and developing detailed logic models that describe key activities to accurately reflect the program and assist in effective program management. The authors use a funded special education teacher preparation program to exemplify the utility of drill down logic models. The paper concludes with lessons learned from the iterative revision process and suggests how the process can lead to more flexible and calibrated program management. Copyright © 2017 Elsevier Ltd. All rights reserved.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1977-05-31
Research was expanded to the drilling of crystalline rock. Advance rates of 40 inches per minute have been achieved at 16,000 psi, 10 gpm flow rate in a 30,000 psi compressive strength rock using the water alone as the drilling mechanism. The quality of the hole achieved as the jet drilled a variety of rock was found to vary and a hydromechanical drilling bit, combining high pressure water jets with roller cones, has been developed. A field drilling unit has been tested and modified to allow the drilling of holes to 3/sup 1///sub 2/ inch diameter using the hydromechanical drill.more » Preliminary work on the development of a cavitation test for rock is also included.« less
43 CFR 3217.14 - When will BLM approve my drilling or development contract?
Code of Federal Regulations, 2013 CFR
2013-10-01
... 43 Public Lands: Interior 2 2013-10-01 2013-10-01 false When will BLM approve my drilling or... RESOURCE LEASING Cooperative Agreements § 3217.14 When will BLM approve my drilling or development contract? BLM may approve a drilling or development contract when: (a) One or more geothermal lessees enter into...
43 CFR 3217.14 - When will BLM approve my drilling or development contract?
Code of Federal Regulations, 2012 CFR
2012-10-01
... 43 Public Lands: Interior 2 2012-10-01 2012-10-01 false When will BLM approve my drilling or... RESOURCE LEASING Cooperative Agreements § 3217.14 When will BLM approve my drilling or development contract? BLM may approve a drilling or development contract when: (a) One or more geothermal lessees enter into...
PRELIMINARY DRILLING IN THE POWDER RIVER BASIN, CONVERSE, CAMPBELL, AND JOHNSON COUNTRIES, WYOMING
DOE Office of Scientific and Technical Information (OSTI.GOV)
Geslin, H.E.; Bromley, C.P.
1957-06-01
On July 16, 1953, a diamond core-drilling program was begun in the pumpkin Buttes area to secure geologic information. Drilling was terminated March 11, 1964, after 12 holes had been completed for a total of 5,813 feet. An investigational rotary noncore-drilling project was conducted from June l4, to September 17, 1954, in the southern part of the Powder River Basin, Campbell, Johnson, and Converse Counties, Wyoming. Drilling was done in the Pumpkin Buttes area and the Converse County area. A total of 52,267 feet was drilled and the average depth of hole was 75.3 feet. Forty-one anomalous areas in themore » Powder River Basin were drilled; of these, three in Converse County were found to contain possible commercial ore bodies. All of the drilling was done in the Wasatch formation of Eocene age except one locality, which was in the Fort Union formation of Paleocene age. (auth)« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Aswad, Z.A.R.; Al-Hadad, S.M.S.
1983-03-01
The powerful Rosenbrock search technique, which optimizes both the search directions using the Gram-Schmidt procedure and the step size using the Fibonacci line search method, has been used to optimize the drilling program of an oil well drilled in Bai-Hassan oil field in Kirkuk, Iran, using the twodimensional drilling model of Galle and Woods. This model shows the effect of the two major controllable variables, weight on bit and rotary speed, on the drilling rate, while considering other controllable variables such as the mud properties, hydrostatic pressure, hydraulic design, and bit selection. The effect of tooth dullness on the drillingmore » rate is also considered. Increasing the weight on the drill bit with a small increase or decrease in ratary speed resulted in a significant decrease in the drilling cost for most bit runs. It was found that a 48% reduction in this cost and a 97-hour savings in the total drilling time was possible under certain conditions.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Arnis Judzis
2004-04-01
This document details the progress to date on the OPTIMIZATION OF MUD HAMMER DRILLING PERFORMANCE--A PROGRAM TO BENCHMARK THE VIABILITY OF ADVANCED MUD HAMMER DRILLING contract for the quarter starting January 2004 through March 2004. The DOE and TerraTek continue to wait for Novatek on the optimization portion of the testing program (they are completely rebuilding their fluid hammer). The latest indication is that the Novatek tool would be ready for retesting only 3Q 2004. Smith International's hammer will be tested in April of 2004 (2Q 2004 report). Accomplishments included the following: (1) TerraTek presented a paper for publication inmore » conjunction with a peer review at the GTI Natural Gas Technologies Conference February 10, 2004. Manuscripts and associated presentation material were delivered on schedule. The paper was entitled ''Mud Hammer Performance Optimization''. (2) Shell Exploration and Production continued to express high interest in the ''cutter impact'' testing program Task 8. Hughes Christensen supplied inserts for this testing program. (3) TerraTek hosted an Industry/DOE planning meeting to finalize a testing program for ''Cutter Impact Testing--Understanding Rock Breakage with Bits'' on February 13, 2004. (4) Formal dialogue with Terralog was initiated. Terralog has recently been awarded a DOE contract to model hammer mechanics with TerraTek as a sub-contractor. (5) Novatek provided the DOE with a schedule to complete their new fluid hammer and test it at TerraTek.« less
Ocean Drilling Program Contributions to the Understanding of the Deep Subsurface Biosphere
NASA Astrophysics Data System (ADS)
Fisk, M. R.
2003-12-01
Tantalizing evidence for microbes in oceanic basalts has been reported for a few decades, but it was from rocks cored on Ocean Drilling Program (ODP) Leg 148 in 1993 that the first clear-cut evidence of microbial invasion of ocean basalts was obtained. (Work on ODP legs, starting with Leg 112 in 1986, had already revealed the presence of significant microbial biomass in sediments.) In 1997 ODP created the Deep Biosphere Program Planning Group to promote the investigation of the microbiology of the ocean crust. In 1999 ODP built a microbiology lab on the JOIDES Resolution, and used the lab that year (Legs 185 and 187) to test the amount of microbial contamination introduced into rocks during drilling and to establish cultures from cored basalts. These experiments have been repeated on several legs since then. The development of CORKs has permitted long-term sampling of subseafloor fluids, and microorganisms have been recovered from CORKed holes. Thus, ODP made it possible for the scientific community to address major questions about the biology of the igneous crust, such as, (1) What microbes are present? (2) How abundant are they? (3) How are they distributed? DNA from basalts and subseafloor fluids reveal what types of organisms are present. Cell abundance and biomass have been estimated based on cell counts and on organic content of basalts. Surveys of basalts in DSDP/ODP repositories indicate that microorganisms are ubiquitous in the igneous crust. Microorganisms are found in rocks that are close to 100° C. They are found as deep as 1500 m below the sea floor, and in rocks as young as a few years and as old as 170 million years. Because of the vast size of the habitat, microorganism, even if present in small numbers, could be a significant fraction of the Earth's biomass. In a short time ODP contributed to advances in our understanding of the oceanic subsurface biosphere. Answers to other significant questions such as: (1) How do the microorganisms live?, (2) What impact do subsurface microorganisms have on the surface biosphere? (3) And, what roles do the subsurface biosphere play in element cycling? will be answered by future drilling. The International Ocean Drilling Program (IODP) is in the enviable position of providing support to address these key questions about the Earth's subsurface biosphere.
The Role of the Armys Sustainment Think Tank in Force Modernization
2016-05-17
for the Basic Officer Leader Course, and the Strategic Logistician Scholarship program . Each of these projects is designed to produce the game...of con - cept drills, simulation exercises, and studies, to identify capability gaps. Once the gaps have been validated, CASCOM develops solution...to changing the con - tent of the sustainment doctrinal publications, CASCOM changed the way doctrine is developed. The doctrine revision strategy
Outokumpu Deep Drill Hole: Window to the Precambrian bedrock
NASA Astrophysics Data System (ADS)
Heinonen, Suvi; Kietäväinen, Riikka; Ahonen, Lasse; Kukkonen, Ilmo
2017-04-01
Outokumpu Deep Drill Hole is located in eastern Finland, at latitude 62°43'4'' N and longitude 29°3'43'' E. This 2516 m long and fully cored deep hole has been utilized as a geolaboratory open for researchers worldwide since it was drilled in 2004-2005. The 220 mm diameter drill hole is open without a casing (excluding the uppermost 40 m) and thus provides a direct access to in situ conditions to 2.5 km depth. There is a wide range of wire-line logs carried out by the drilling contractor and later by ICDP (International Continental Scientific Drilling Program) in several logging sessions for geothermal, hydrogeological and deep biosphere studies. Lithology, metamorphism, fluid inclusions, density, magnetic properties, seismic velocities and thermal properties of the drill core have been studied by several international groups. The hole has kept open since the end of drilling enabling future studies to be conducted in it. The drill hole is situated in the southwestern part of the Outokumpu historical mining district famous for its Cu-Co-Zn sulfide deposits. These sulfide deposits are hosted by 1.96 Ga old ophiolitic rock types, known as the Outokumpu assemblage, also penetrated by the deep drill hole at 1314-1515 m depth. Laboratory and in situ petrophysical measurements have provided valuable information about physical properties of the typical rocks of the area that can be utilized in the mineral exploration efforts. The drill site of Outokumpu was chosen based on strong reflectivity observed in the high resolution seismic profiles acquired earlier in the area. Outokumpu Deep Drill Hole revealed that these reflections originate from the acoustic impedance variations caused by the ore hosting Outokumpu assemblage. In 2006, surface seismic reflection and vertical seismic profiling (VSP) data were measured in the drill site, and these data show that not only is Outokumpu assemblage rocks reflective but also water bearing fracture at 965 m depth is observed as a strong reflector. This fracture, as well as other fractures penetrated by the drill hole, contains saline water and gases, mainly methane, nitrogen, hydrogen and helium. Salinity of water in the deeper part (>1000 m) of the drill hole has continuously increased since the drilling. Gas-rich water slowly seeps upward and bubble out at the water table. In total, five different water types have been discerned along the drill hole by geochemical and isotopic methods and residence times up to 58 Ma indicated by the accumulation of noble gases. Microbiological studies in the Outokumpu Deep Drill Hole show that not only do different fracture zones act as places for shift in groundwater chemistry but also in the microbial communities. After a decade of research, Outokumpu drill hole site is geologically well known and thus provides a good environment to test new tools developed for exploration, microbiological or hydrogeological purposes, for example. Geological Survey of Finland is open for new research collaboration projects related to the drill site.
Design criteria for post and beam bents with drilled shafts.
DOT National Transportation Integrated Search
2007-12-01
The research work presented in the report addresses the potential areas of conservatism in the current practice related to bridge : bents supported by drilled shafts and piles. The research encompasses modeling efforts and an experimental program. Mo...
1983-01-01
Daily. Proposal Evaluation Procedure Organizations interested in doing the work adverstised submit proposals and cost estimates. The USCG contracting...types of offshore structures. These structures have largely been fixed platforms for petroleum drilling and production, and mobile offshore drilling...structures and of those mobile drilling units that are bottom supported, such as jack-ups and submersibles. Structures which are held in place by anchors
DOE Office of Scientific and Technical Information (OSTI.GOV)
Musgrave, J.A.; Goff, F.; Shevenell, L.
1989-02-01
This report presents geochemical and isotopic data on rocks and water and wellbore geophysical data from the Continental Scientific Drilling Program core holes VC-1 and VC-2a, Valles Caldera, New Mexico. These core holes were drilled as a portion of a broader program that seeks to answer fundamental questions about magma, water/rock interactions, ore deposits, and volcanology. The data in this report will assist the interpretation of the hydrothermal system in the Jemez Mountains and will stimulate further research in magmatic processes, hydrothermal alteration, ore deposits, hydrology, structural geology, and hydrothermal solution chemistry. 37 refs., 36 figs., 28 tabs.
Math Activities Using LogoWriter--Patterns and Designs.
ERIC Educational Resources Information Center
Flewelling, Gary
This book is one in a series of teacher resource books developed to: (1) rescue students from the clutches of computers that drill and control; and (2) supply teachers with computer activities compatible with a mathematics program that emphasizes investigation, problem solving, creativity, and hypothesis making and testing. This is not a book…
Math Activities Using LogoWriter--Numbers & Operations.
ERIC Educational Resources Information Center
Flewelling, Gary
This book is one in a series of teacher resource books developed to: (1) rescue students from the clutches of computers that drill and control; and (2) supply teachers with computer activities compatible with a mathematics program that emphasizes investigation, problem solving, creativity, and hypothesis making and testing. This is not a book…
Manual Tape Scripts: German, Level 2. Curriculum Bulletin, 1969-70 Series, Number 19.
ERIC Educational Resources Information Center
Lipton, Gladys; And Others
This manual of tape scripts, together with a set of foreign language tapes for Level 2 German, was prepared to support the curriculum bulletin "New York City Foreign Language Program for Schools: German, Levels 1-4." Vocabulary, repetition, transformation, and recombination drills on specific grammatical features allow further development of…
DOE Office of Scientific and Technical Information (OSTI.GOV)
Phelps, J.; Hoopingarner, J.
Effective techniques have been developed from work on dozens of North Sea Wells to minimize the amount of oil-based mud discharged to the sea while maintaining acceptable levels of solids. Pressure to reduce pollution during the course of drilling prompted the development of these techniques. They involve personnel and optimization of mud system and procedures. Case histories demonstrate that regulations may be met with economical techniques using existing technology. The benefits of low solids content are widely known, and are a key part of any successful mud program. Good solids control should result in lower mud costs and better drillingmore » performance. Operators have specified high-performance shakers to accomplish this and have revised their mud programs with lower and lower allowable drilled solids percentages. This will pay off in certain areas. But with the U.K. Department of Energy regulations requiring cuttings oil discharge content (CODC) to be less than 150 g of oil/kg of dry solids discharge that went into effect Jan. 1, 1989, oil-loss control has a higher profile in the U.K. sector of the North Sea.« less
vTrain: a novel curriculum for patient surge training in a multi-user virtual environment (MUVE).
Greci, Laura S; Ramloll, Rameshsharma; Hurst, Samantha; Garman, Karen; Beedasy, Jaishree; Pieper, Eric B; Huang, Ricky; Higginbotham, Erin; Agha, Zia
2013-06-01
During a pandemic influenza, emergency departments will be overwhelmed with a large influx of patients seeking care. Although all hospitals should have a written plan for dealing with this surge of health care utilization, most hospitals struggle with ways to educate the staff and practice for potentially catastrophic events. Hypothesis/Problem To better prepare hospital staff for a patient surge, a novel educational curriculum was developed utilizing an emergency department for a patient surge functional drill. A multidisciplinary team of medical educators, evaluators, emergency preparedness experts, and technology specialists developed a curriculum to: (1) train novice users to function in their job class in a multi-user virtual environment (MUVE); (2) obtain appropriate pre-drill disaster preparedness training; (3) perform functional team exercises in a MUVE; and (4) reflect on their performance after the drill. A total of 14 students participated in one of two iterations of the pilot training program; seven nurses completed the emergency department triage course, and seven hospital administrators completed the Command Post (CP) course. All participants reported positive experiences in written course evaluations and structured verbal debriefings, and self-reported increase in disaster preparedness knowledge. Students also reported improved team communication, planning, team decision making, and the ability to visualize and reflect on their performance. Data from this pilot program suggest that the immersive, virtual teaching method is well suited to team-based, reflective practice and learning of disaster management skills.
Web-based training: a new paradigm in computer-assisted instruction in medicine.
Haag, M; Maylein, L; Leven, F J; Tönshoff, B; Haux, R
1999-01-01
Computer-assisted instruction (CAI) programs based on internet technologies, especially on the world wide web (WWW), provide new opportunities in medical education. The aim of this paper is to examine different aspects of such programs, which we call 'web-based training (WBT) programs', and to differentiate them from conventional CAI programs. First, we will distinguish five different interaction types: presentation; browsing; tutorial dialogue; drill and practice; and simulation. In contrast to conventional CAI, there are four architectural types of WBT programs: client-based; remote data and knowledge; distributed teaching; and server-based. We will discuss the implications of the different architectures for developing WBT software. WBT programs have to meet other requirements than conventional CAI programs. The most important tools and programming languages for developing WBT programs will be listed and assigned to the architecture types. For the future, we expect a trend from conventional CAI towards WBT programs.
Workshop to develop deep-life continental scientific drilling projects
Kieft, T. L.; Onstott, T. C.; Ahonen, L.; ...
2015-05-29
The International Continental Scientific Drilling Program (ICDP) has long espoused studies of deep subsurface life, and has targeted fundamental questions regarding subsurface life, including the following: "(1) What is the extent and diversity of deep microbial life and what are the factors limiting it? (2) What are the types of metabolism/carbon/energy sources and the rates of subsurface activity? (3) How is deep microbial life adapted to subsurface conditions? (4) How do subsurface microbial communities affect energy resources? And (5) how does the deep biosphere interact with the geosphere and atmosphere?" (Horsfield et al., 2014) Many ICDP-sponsored drilling projects have includedmore » a deep-life component; however, to date, not one project has been driven by deep-life goals, in part because geomicrobiologists have been slow to initiate deep biosphere-driven ICDP projects. Therefore, the Deep Carbon Observatory (DCO) recently partnered with the ICDP to sponsor a workshop with the specific aim of gathering potential proponents for deep-life-driven ICDP projects and ideas for candidate drilling sites. Twenty-two participants from nine countries proposed projects and sites that included compressional and extensional tectonic environments, evaporites, hydrocarbon-rich shales, flood basalts, Precambrian shield rocks, subglacial and subpermafrost environments, active volcano–tectonic systems, megafan deltas, and serpentinizing ultramafic environments. The criteria and requirements for successful ICDP applications were presented. Deep-life-specific technical requirements were discussed and it was concluded that, while these procedures require adequate planning, they are entirely compatible with the sampling needs of other disciplines. As a result of this workshop, one drilling workshop proposal on the Basin and Range Physiographic Province (BRPP) has been submitted to the ICDP, and several other drilling project proponents plan to submit proposals for ICDP-sponsored drilling workshops in 2016.« less
Engineering report on drilling in the San Rafael Swell area, Utah
DOE Office of Scientific and Technical Information (OSTI.GOV)
Jones, L.I.
1980-05-01
The San Rafael Swell drilling project was conducted by Bendix Field Engineering Corporation in support of the US Department of Energy National Uranium Resource Evaluation (NURE) program. This project consisted of 27 drill holes ranging in depth from 120.0 ft (36.5 m) to 3,700.0 ft (1,127.7 m). A total of 41,716 ft (12,715 m) was drilled, of which 3,099.8 ft (944.8 m) were cored. Geophysical logging was supplied by Century Geophysical Corporation and Bendix Field Engineering Corporation. The objective of the project was to test the uranium potential of the Triassic and Jurassic sandstone units and to investigate areas wheremore » industry was unlikely to drill in the near future. Drilling commenced September 24, 1978, and was finished on December 17, 1979.« less
New scientific ocean drilling depth record extends study of subseafloor life
NASA Astrophysics Data System (ADS)
Showstack, Randy
2012-09-01
The Japanese deep-sea drilling vessel Chikyu set a new depth record for scientific ocean drilling and core retrieval by reaching a depth of 2119.5 meters below the seafloor (mbsf) on 6 September. This is 8.5 meters deeper than the prior record, set 19 years ago. Three days later, on 9 September, Chikyu set another record by reaching a drilling depth of 2466 mbsf, the maximum depth that will be attempted during the current expedition. The 6 September record was set on day 44 of the Deep Coalbed Biosphere off Shimokita expedition, which is expedition 337 of the Integrated Ocean Drilling Program (IODP). It occurred at drilling site C0020 in the northwestern Pacific Ocean, approximately 80 kilometers northeast from Hachinohe, Japan. The expedition is scheduled to conclude on 30 September.
NASA Astrophysics Data System (ADS)
Vlase, A.; Blăjină, O.; Iacob, M.; Darie, V.
2015-11-01
Two addressed issues in the research regarding the cutting machinability, establishing of the optimum cutting processing conditions and the optimum cutting regime, do not yet have sufficient data for solving. For this reason, in the paper it is proposed the optimization of the tool life and the cutting speed at the drilling of a certain stainless steel in terms of the maximum productivity. For this purpose, a nonlinear programming mathematical model to maximize the productivity at the drilling of the steel is developed in the paper. The optimum cutting tool life and the associated cutting tool speed are obtained by solving the numerical mathematical model. Using this proposed model allows increasing the accuracy in the prediction of the productivity for the drilling of a certain stainless steel and getting the optimum tool life and the optimum cutting speed for the maximum productivity. The results presented in this paper can be used in the production activity, in order to increase the productivity of the stainless steels machining. Also new research directions for the specialists in this interested field may come off from this paper.
Hawaii Scientific Drilling Project: Objectives, Successes, Surprises and Frustrations
NASA Astrophysics Data System (ADS)
Depaolo, D. J.; Stolper, E.; Thomas, D. M.
2008-12-01
The Hawaii Scientific Drilling Project (HSDP) is a long-running project undertaken with the objective of studying a mantle plume by drilling an extended sequence of lavas from a single Hawaiian volcano. The project originated with a proposal to NSF in late 1986 with the idea of drilling to the Moho under Hilo; the target depth was estimated at 12km, commensurate with the depth reached by the drilling program then being pursued by the USSR and that proposed in the U.S. for the southern Appalachians, and in line with the aspirations of the nascent DOSECC program. Subsequently, due to limitations in funding and reorganization of the drilling program into what later became the NSF Continental Dynamics Program, HSDP was re-scoped with the objective of drilling deeply enough (ca. 4.5km) to recover most of the eruptive history of a single volcano. The project first went to a pilot stage, which resulted in coring to a depth of 1.1km in late 1993. The pilot stage was relatively inexpensive (1M including science) and productive. Funding was then obtained from NSF and ICDP in 1995 (ca. 12M) with the objective of drilling to 4.5km. Drilling was originally planned for a five-year period, in two campaigns. The first campaign, in 1999, resulted in efficient coring to a depth of 3.1km over a period of 6 months; it used about 40 percent of the funds and was also highly productive. Deepening the hole below 3.1km turned out to be both difficult and expensive, although for interesting reasons. To facilitate deeper drilling the hole needed to be reamed to a larger diameter; but when this was done the well unexpectedly started to flow. We now know that there are several deep pressurized aquifers, with varying salt content, but these hydrological phenomena were totally unanticipated. A key finding, also unanticipated, is that cold seawater circulates through the volcanic pile in volumes sufficient to refrigerate the entire section below 700m depth to temperatures about 25 degrees below a normal geothermal gradient. In early 1999 when the first drilling campaign was organized, the price of oil was 10 USD (rigs and drilling crews were available and reasonably priced); in early 2003 when hole opening was being arranged, the price of oil was 30 USD, and for the coring campaigns in 2005 and 2007 it was 50 to 70 USD. For these reasons, and because trip times were longer and deeply buried pillow basalts more difficult to drill, the remainder of the project funds (and then some) were needed to deepen the hole from 3.1 to 3.5km. Nevertheless, the project obtained a nearly continuous, and virtually unweathered, core consisting of lava flows, hyaloclastite, minor intrusives and sediment from a 3260m section of the Mauna Kea volcano, covering an age range from 200 to over 600 ka. It also recovered a 250m and a 280m section of the Mauna Loa volcano. A wealth of geological, volcanological, petrological, geochemical, geomagnetic, geodynamic, hydrological, and geobiological data have come from the core and the well, and more are coming in. The unprecedented geochemical-petrological data sets are a major success, as is the fact that geochemists can work together, but the hoped-for detailed geochronology for the core has proven difficult to obtain.
Drill System Development for the Lunar Subsurface Exploration
NASA Astrophysics Data System (ADS)
Zacny, Kris; Davis, Kiel; Paulsen, Gale; Roberts, Dustyn; Wilson, Jack; Hernandez, Wilson
Reaching the cold traps at the lunar poles and directly sensing the subsurface regolith is a primary goal of lunar exploration, especially as a means of prospecting for future In Situ Resource Utilization efforts. As part of the development of a lunar drill capable of reaching a depth of two meters or more, Honeybee Robotics has built a laboratory drill system with a total linear stroke of 1 meter, capability to produce as much as 45 N-m of torque at a rotational speed of 200 rpm, and a capability of delivering maximum downforce of 1000 N. Since this is a test-bed, the motors were purposely chosen to be relative large to provide ample power to the drill system (the Apollo drill was a 500 Watt drill, i.e. not small in current standards). In addition, the drill is capable of using three different drilling modes: rotary, rotary percussive and percussive. The frequency of percussive impact can be varied if needed while rotational speed can be held constant. An integral part of this test bed is a vacuum chamber that is currently being constructed. The drill test-bed is used for analyzing various drilling modes and testing different drill bit and auger systems under low pressure conditions and in lunar regolith simulant. The results of the tests are used to develop final lunar drill design as well as efficient drilling protocols. The drill was also designed to accommodate a downhole neutron spectrometer for measuring the amount of hydrated material in the area surrounding the borehole, as well as downhole temperature sensors, accelerometers, and electrical properties tester. The presentation will include history of lunar drilling, challenges of drilling on the Moon, a description of the drill and chamber as well as preliminary drilling test results conducted in the ice-bound lunar regolith simulant with a variety of drill bits and augers systems.
Case history of Yakin Field: its development and sand control
DOE Office of Scientific and Technical Information (OSTI.GOV)
Sawolo, N.; Krueger, R.F.; Maly, G.P.
1982-01-01
This study deals with the development of the Yakin Field in E. Kalimantan, Indonesia, with emphasis on the sand control methods used. Implementation of an effective sand control program insured the successful development of this field. Gravel packed wells had substantially lower production decline rates than the initial completions without gravel packs. Control of sand production also has been demonstrated by the lack of sand problems during the 4-1/2 yr since the sand control program was initiated. During this time there have been no failures of submersible pumps that were associated with sand production. The successful sand control program wasmore » achieved by a well coordinated and cooperative effort of drilling, reservoir engineering, production research, and service company personnel.« less
Session: Program Review X Wrap-Up
DOE Office of Scientific and Technical Information (OSTI.GOV)
None
1992-01-01
This wrap-up session at the Geothermal Energy Program Review X: Geothermal Energy and the Utility Market consisted of Closing Remarks by Roland R. Kessler and six NGA Industry Critique Panel presentations: ''Summary of Comments on DOE-Industry Cooperation by Geothermal Industry Panel'' by James B. Koenig, GeothermEx, Inc.; ''NGA Industry Critique of the Exploration Component'' by Joe L. Iovenitti, Weiss Associates; ''Critique of Drilling Research'' by Jerry Hamblin, UNOCAL Geothermal; ''Critique Panel Comments on Reservoir Engineering, DOE Geothermal Technology Development'' by Dennis Kaspereit, California Energy Company, Inc.; ''DOE Geothermal Program Review - Critique on Production'' by Douglas B. Jung, Two-Phase Engineeringmore » and Research; ''Comments on the DOE Hydrothermal Energy Conversion R&D Program'' by David L. Mendive, Geothermal Development Associates.« less
76 FR 11812 - Drill Pipe and Drill Collars From China
Federal Register 2010, 2011, 2012, 2013, 2014
2011-03-03
... INTERNATIONAL TRADE COMMISSION [Investigation Nos. 701-TA-474 and 731-TA-1176 (Final)] Drill Pipe and Drill Collars From China Determinations On the basis of the record \\1\\ developed in the subject... imports of drill pipe and drill collars from China, provided for in subheadings 7304.22, 7304.23, and 8431...
Testing and Development of a Percussive Augmenter for Rotary Drills
NASA Technical Reports Server (NTRS)
Donnelly, Christopher; Bar-Cohen, Yoseph; Chang, Zensheu; Badescu, Mircea; Sherrit, Stewart
2011-01-01
Hammering drills are effective in fracturing the drilled medium while rotary drills remove cuttings. The combination provides a highly effective penetration mechanism. Piezoelectric actuators were integrated into an adapter to produce ultrasonic percussion; augmenting rotary drilling. The drill is capable of operating at low power, low applied force and, with proper tuning, low noise. These characteristics are of great interest for future NASA missions and the construction/remodeling industry. The developed augmenter connects a commercially available drill and bit and was tested to demonstrate its capability. Input power to the drill was read using a multimeter and the augmenter received a separate input voltage. The drive frequency of the piezoelectric actuator was controlled by a hill climb algorithm that optimizes and records average power usage to operate the drill at resonating frequency. Testing the rotary drill and augmenter across a range of combinations with total power constant at 160 Watts has shown results in concrete and limestone samples that are as good as or better than the commercial drill. The drill rate was increased 1.5 to over 10 times when compared to rotation alone.
Extended Horizontal Jet Drilling for EGS applications in Petrothermal Environments
NASA Astrophysics Data System (ADS)
Hahn, Simon; Duda, Mandy; Stoeckhert, Ferdinand; Wittig, Volker; Bracke, Rolf
2017-04-01
Extended Horizontal Jet Drilling for EGS applications in Petrothermal Environments S. Hahn, M. Duda, F. Stoeckhert, V. Wittig, R. Bracke International Geothermal Centre Bochum High pressure water jet drilling technologies are widely used in the drilling industry. Especially in geothermal and hard rock applications, horizontal (radial) jet drilling is, however, confronted with several limitations like lateral length, hole size and steerability. In order to serve as a serious alternative to conventional stimulation techniques these high pressure jetting techniques are experimentally investigated to gain fundamental knowledge about the fluid-structure interaction, to enhance the rock failing process and to identify the governing drilling parameters. The experimental program is divided into three levels. In a first step jetting experiments are performed under free surface conditions while logging fluid pressures, flow speeds and extracted rock volume. All process parameters are quantified with a self-developed jet-ability index and compared to the rock properties (density, porosity, permeability, etc.). In a second step experiments will be performed under pressure-controlled conditions. A test bench is currently under construction offering the possibility to assign an in-situ stress field to the specimen while penetrating the rock sample with a high pressure water jet or a radial jet drilling device. The experimental results from levels 1 and 2 allow to identify the governing rock failure mechanisms and to correlate them with physical rock properties and limited reservoir conditions. Results of the initial tests do show a clear dependency of achievable penetration depth on the interaction of jetting and rock parameters and an individual threshold of the nozzle outlet velocity can be noticed in order to successfully penetrate different formation types. At level 3 jetting experiments will be performed at simulated reservoir conditions corresponding to 5.000 m depth (e.g. up to 1.250 bar and 180 °C) on large samples with a diameter of 25 cm and a length of up to 3m using GZB's in-situ borehole and geofluid simulator 'iBOGS'. Experiments will be documented by active and passive ultrasound measurements and high speed imaging. Acknowledgement Jetting research and work at GZB has received funding in part from the European Union's Horizon 2020 research and innovation program under grant agreement No 654662 and also from federal government GER and state of NRW.
Lane, Michael
2013-06-28
Proposed drill sites for intermediate depth temperature gradient holes and/or deep resource confirmation wells. Temperature gradient contours based on shallow TG program and faults interpreted from seismic reflection survey are shown, as are two faults interpreted by seismic contractor Optim but not by Oski Energy, LLC.
40 CFR 300.212 - Area response drills.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 40 Protection of Environment 27 2010-07-01 2010-07-01 false Area response drills. 300.212 Section 300.212 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SUPERFUND, EMERGENCY PLANNING, AND COMMUNITY RIGHT-TO-KNOW PROGRAMS NATIONAL OIL AND HAZARDOUS SUBSTANCES POLLUTION CONTINGENCY...
40 CFR 300.212 - Area response drills.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 40 Protection of Environment 28 2014-07-01 2014-07-01 false Area response drills. 300.212 Section 300.212 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SUPERFUND, EMERGENCY PLANNING, AND COMMUNITY RIGHT-TO-KNOW PROGRAMS NATIONAL OIL AND HAZARDOUS SUBSTANCES POLLUTION CONTINGENCY...
40 CFR 300.212 - Area response drills.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 40 Protection of Environment 28 2011-07-01 2011-07-01 false Area response drills. 300.212 Section 300.212 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SUPERFUND, EMERGENCY PLANNING, AND COMMUNITY RIGHT-TO-KNOW PROGRAMS NATIONAL OIL AND HAZARDOUS SUBSTANCES POLLUTION CONTINGENCY...
Purpose-built PDC bit successfully drills 7-in liner equipment and formation: An integrated solution
DOE Office of Scientific and Technical Information (OSTI.GOV)
Puennel, J.G.A.; Huppertz, A.; Huizing, J.
1996-12-31
Historically, drilling out the 7-in, liner equipment has been a time consuming operation with a limited success ratio. The success of the operation is highly dependent on the type of drill bit employed. Tungsten carbide mills and mill tooth rock bits required from 7.5 to 11.5 hours respectively to drill the pack-off bushings, landing collar, shoe track and shoe. Rates of penetration dropped dramatically when drilling the float equipment. While conventional PDC bits have drilled the liner equipment successfully (averaging 9.7 hours), severe bit damage invariably prevented them from continuing to drill the formation at cost-effective penetration rates. This papermore » describes the integrated development and application of an IADC M433 Class PDC bit, which was designed specifically to drill out the 7-in. liner equipment and continue drilling the formation at satisfactory penetration rates. The development was the result of a joint investigation There the operator and bit/liner manufacturers shared their expertise in solving a drilling problem, The heavy-set bit was developed following drill-off tests conducted to investigate the drillability of the 7-in. liner equipment. Key features of the new bit and its application onshore The Netherlands will be presented and analyzed.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Arnis Judzis
2006-03-01
Operators continue to look for ways to improve hard rock drilling performance through emerging technologies. A consortium of Department of Energy, operator and industry participants put together an effort to test and optimize mud driven fluid hammers as one emerging technology that has shown promise to increase penetration rates in hard rock. The thrust of this program has been to test and record the performance of fluid hammers in full scale test conditions including, hard formations at simulated depth, high density/high solids drilling muds, and realistic fluid power levels. This paper details the testing and results of testing two 7more » 3/4 inch diameter mud hammers with 8 1/2 inch hammer bits. A Novatek MHN5 and an SDS Digger FH185 mud hammer were tested with several bit types, with performance being compared to a conventional (IADC Code 537) tricone bit. These tools functionally operated in all of the simulated downhole environments. The performance was in the range of the baseline ticone or better at lower borehole pressures, but at higher borehole pressures the performance was in the lower range or below that of the baseline tricone bit. A new drilling mode was observed, while operating the MHN5 mud hammer. This mode was noticed as the weight on bit (WOB) was in transition from low to high applied load. During this new ''transition drilling mode'', performance was substantially improved and in some cases outperformed the tricone bit. Improvements were noted for the SDS tool while drilling with a more aggressive bit design. Future work includes the optimization of these or the next generation tools for operating in higher density and higher borehole pressure conditions and improving bit design and technology based on the knowledge gained from this test program.« less
NASA Astrophysics Data System (ADS)
Rangaswamy, T.; Nagaraja, R.
2018-04-01
The Study focused on design and development of solid carbide step drill K34 to drill holes on composite materials such as Carbon Fiber Reinforced Plastic (CFRP) and Glass Fiber Reinforced Plastic (GFRP). The step drill K34 replaces step wise drilling of diameter 6.5mm and 9 mm holes that reduces the setup time, cutting speed, feed rate cost, delamination and increase the production rate. Several researchers have analyzed the effect of drilling process on various fiber reinforced plastic composites by carrying out using conventional tools and machinery. However, this process operation can lead to different kind of damages such as delamination, fiber pullout, and local cracks. To avoid the problems encountered at the time of drilling, suitable tool material and geometry is essential. This paper deals with the design and development of K34 Carbide step drill used to drill holes on CFRP and GFRP laminates. An Experimental study carried out to investigate the tool geometry, feed rate and cutting speed that avoids delamination and fiber breakage.
The use of drilling by the U.S. Antarctic program
DOE Office of Scientific and Technical Information (OSTI.GOV)
Wade, M.C.; Webb, J.W.; Hedberg, W.H.
1994-08-01
This report on drilling in the Antarctic has been prepared by the U.S. National Science Foundation (NSF) to assist principal investigators and others in complying with the National Environmental Policy Act (NEPA) and the Antarctic Treaty of 1961. Implementing regulations for NEPA are spelled out in 40 CFR 1500-1508. Environmental protection under the Antarctic Treaty is addressed in the Protocol on Environmental Protection to the Antarctic Treaty (hereafter referred to as the Protocol), which was adopted by 26 countries in 1991. In the United States, responsibility for compliance with these requirements rests with the NSF Office of Polar Programs (OPP),more » which manages the U.S. Antarctic Program (USAP). The USAP recognizes the potentially profound impacts that its presence and activities can have on the antarctic environment. In its extensive support of operations and research in Antarctica, the USAP uses all practical means to foster and maintain natural conditions while supporting scientific endeavors in a safe and healthful manner. Reducing human impacts on the antarctic environment is a major goal of the USAP. The USAP`s operating philosophy is based on broad yet reasonable and practical assumptions concerning environmental protection. The USAP maintains three year-round stations on the continent to support scientific research. Research and associated support operations at these stations and camps sometimes involve drilling into ice, soil, or ocean sediments. In order to comply with NEPA and the Protocol, it is necessary for principal investigators and others to assess the environmental effects of drilling. This report has been prepared to assist in this process by describing various drilling technologies currently available for use in Antarctica, generally characterizing the potential environmental impacts associated with these drilling techniques, and identifying possible mitigation measures to reduce impacts.« less
NASA Astrophysics Data System (ADS)
Wenning, Quinn; Almquist, Bjarne; Ask, Maria; Schmitt, Douglas R.; Zappone, Alba
2015-04-01
The Caledonian orogeny, preserved in Scandinavia and Greenland, began with the closure of the Iapetus Ocean and culminated in the collision of Baltica and Laurentia cratons during the middle Paleozoic. The COSC scientific drilling project aims at understanding the crustal structure and composition of the Scandinavian Caledonides. The first well of the dual phase drilling program, completed in Summer of 2014, drilled through ~2.5 km of the Seve Nappe Complex near the town of Åre, Sweden. Newly acquired drill core and borehole logs provide fresh core material for physical rock property measurements and in-situ stress determination. This contribution presents preliminary data on compressional and shear wave ultrasonic velocities (Vp, Vs) determined from laboratory measurements on drill cores, together with in-situ stress orientation analysis using image logs from the first borehole of the Collisional Orogeny in the Scandinavian Caledonides project (COSC-1). An hydrostatically oil pressurized apparatus is used to test the ultrasonic Vp and Vs on three orthogonally cut samples of amphibolite, calcium bearing and felsic gneiss, meta-gabbro, and mylonitic schist from drill core. We measure directional anisotropy variability for each lithology using one sample cut perpendicular to the foliation and two additional plugs cut parallel to the foliation with one parallel to the lineation and the other perpendicular. Measurements are performed using the pulse transmission technique on samples subjected to hydrostatic pressure from 1-350 MPa at dry conditions. We present preliminary results relating Vp and Vs anisotropy to geologic units and degree of deformation. Additionally, we use acoustic borehole televiewer logs to estimate the horizontal stress orientation making use of well developed techniques for observed borehole breakouts (compressive failure) and drilling induced fractures (tensile failure). Preliminary observations show that very few drilling-induced tensile fractures are produced, and that borehole breakouts are episodic and suggests a NE-SW minimum horizontal stress direction
Drill cuttings mount formation study
NASA Astrophysics Data System (ADS)
Teh, Su Yean; Koh, Hock Lye
2014-07-01
Oil, Gas and Energy sector has been identified as an essential driving force in the Malaysian Economic Transformation Programs (ETP). Recently confirmed discovery of many offshore oil and gas deposits in Malaysian waters has ignited new confidence in this sector. However, this has also spurred intense interest on safeguarding the health and environment of coastal waters in Malaysia from adverse impact resulting from offshore oil and gas production operation. Offshore discharge of spent drilling mud and rock cuttings is the least expensive and simplest option to dispose of large volumes of drilling wastes. But this onsite offshore disposal may have adverse environmental impacts on the water column and the seabed. It may also pose occupational health hazards to the workers living in the offshore platforms. It is therefore important to model the transport and deposition of drilling mud and rock cuttings in the sea to enable proper assessment of their adverse impacts on the environment and the workers. Further, accumulation of drill particles on the seabed may impede proper operation of pipelines on the seabed. In this paper, we present an in-house application model TUNA-PT developed to cater to local oil and gas industry needs to simulate the dispersion and mount formation of drill cuttings by offshore oil and gas exploration and production platforms. Using available data on Malaysian coastal waters, simulation analyses project a pile formation on the seabed with a maximum height of about 1 m and pile radius of around 30 to 50 m. Simulated pile heights are not sensitive to the heights of release of the cuttings as the sensitivity has been mitigated by the depth of water.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1993-10-01
These proceedings contain papers pertaining to current research and development of geothermal energy in the USA. The seven sections of the document are: Overview, The Geysers, Exploration and Reservoir Characterization, Drilling, Energy Conversion, Advanced Systems, and Potpourri. The Overview presents current DOE energy policy and industry perspectives. Reservoir studies, injection, and seismic monitoring are reported for the geysers geothermal field. Aspects of geology, geochemistry and models of geothermal exploration are described. The Drilling section contains information on lost circulation, memory logging tools, and slim-hole drilling. Topics considered in energy conversion are efforts at NREL, condensation on turbines and geothermal materials.more » Advanced Systems include hot dry rock studies and Fenton Hill flow testing. The Potpourri section concludes the proceedings with reports on low-temperature resources, market analysis, brines, waste treatment biotechnology, and Bonneville Power Administration activities. Selected papers have been indexed separately for inclusion in the Energy Science and Technology Database.« less
Final report on evaluation of cyclocraft support of oil and gas operations in wetland areas
DOE Office of Scientific and Technical Information (OSTI.GOV)
Eggington, W.J.; Stevens, P.M.; John, C.J.
1994-10-01
The cyclocraft is a proven hybrid aircraft, capable of VTOL, lifting heavy and bulky loads, highly controllable, having high safety characteristics and low operating costs. Mission Research Corporation (MRC), under Department of Energy sponsorship, is evaluating the potential use of cyclocraft in the transport of drill rigs, mud, pipes and other materials and equipment, in a cost effective and environmentally safe manner, to support oil and gas drilling, production, and transportation operations in wetland areas. Based upon the results of an earlier parametric study, a cyclocraft design, having a payload capacity of 45 tons and designated H.1 Cyclocraft, was selectedmore » for further study, including the preparation of a preliminary design and a development plan, and the determination of operating costs. This report contains all of the results derived from the program to evaluate the use of cyclocraft in the support of oil and gas drilling and production operations in wetland areas.« less
Libya: a dynamic Arab oil power
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hobbs, M.
1965-06-01
Libya has become the most dynamic oil-producing nation in the world. Less than 4 yr ago, Libya exported only peanuts, olive oil, and hides. Today, in crude-oil production Libya ranks eighth in the world, with daily production of 1.2 million bbl. Twenty-five oil companies hold concessions and have spent $1.3 billion developing reserves. Petroleum has brought new wealth to the country- an estimated $272 million in 1965. Some 2.75 million ft of hole was drilled in 1964, resulting in 97 oil fields and 4 major basins. Lost circulation has been a problem Transportation and communication are difficult in the vastmore » Libyan desert. Water-contaminated crude and high salt content have plagued production. These problems are being solved. With 45 drillings rigs active, crude production is expected to reach 2 million bpd by 1966. Most of the rigs used are trailer-mounted, unitized 8,000-12,000 ft capacity, that have been specially adapted to work in the Sahara. The drilling-completion programs are briefly described.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Oldham, D.W.
Commercial quantities of gas have been produced from shallow sandstone reservoirs of the Tongue River Member of the Fort Union Formation (Paleocene) in the Wyoming portion of the Powder River Basin. The two largest accumulations discovered to date, Oedekoven and Chan pools, were drilled on prospects which invoked differential compaction as a mechanism for gas entrapment and prospect delineation. Coal-sourced bacterial gas may have accumulated in localized structural highs early in the burial history of lenticular sand bodies and associated sediments. Structural relief is due to the compaction contrast between sand and stratigraphically equivalent fine-grained sediments. A shallow gas playmore » targeting sandstones as potential reservoirs was initiated in the Recluse area in response as sources for bacterial gas, and the presence of lenticular sandstones that may have promoted the development of compaction structures early in the burial process, to which early-formed bacterial gas migrated. Prospects were ranked based on a number of geologic elements related to compaction-induced trap development. Drilling of the Oedekoven prospect, which possessed all prospect elements, led to the discovery and development of the Oedekoven Fort Union gas pool, which has produced nearly 2 BCF of gas from a depth of 340 ft. Production figures from the Oedekoven and Chan pools demonstrate the commercial gas potential of Fort Union sandstone reservoirs in the Powder River Basin. The shallow depths of the reservoirs, coupled with low drilling and completion costs, an abundance of subsurface control with which to delineate prospects, and an existing network of gas-gathering systems, make them attractive primary targets in shallow exploration efforts as well as secondary objectives in deeper drilling programs.« less
Status of GEA review of DOE geothermal research program
DOE Office of Scientific and Technical Information (OSTI.GOV)
Wright, P.M.
The Geothermal Energy Association (GEA) will be conducting a series of workshops related to the DOE Research and Development (R&D) program, the first of which will take place tomorrow and the next day. This workshop will be focussing on drilling research and development. The objective of these workshops is to provide information and recommendations to DOE on the R&D needs and priorities of the geothermal industry. As a GEA officer, I will be conducting these workshops and it is something you might guess I am interested in. I have been interested in geothermal R&D for 20 years now.
43 CFR 3105.3 - Operating, drilling or development contracts.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 43 Public Lands: Interior 2 2012-10-01 2012-10-01 false Operating, drilling or development...) BUREAU OF LAND MANAGEMENT, DEPARTMENT OF THE INTERIOR MINERALS MANAGEMENT (3000) OIL AND GAS LEASING Cooperative Conservation Provisions § 3105.3 Operating, drilling or development contracts. ...
43 CFR 3105.3 - Operating, drilling or development contracts.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 43 Public Lands: Interior 2 2014-10-01 2014-10-01 false Operating, drilling or development...) BUREAU OF LAND MANAGEMENT, DEPARTMENT OF THE INTERIOR MINERALS MANAGEMENT (3000) OIL AND GAS LEASING Cooperative Conservation Provisions § 3105.3 Operating, drilling or development contracts. ...
43 CFR 3105.3 - Operating, drilling or development contracts.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 43 Public Lands: Interior 2 2013-10-01 2013-10-01 false Operating, drilling or development...) BUREAU OF LAND MANAGEMENT, DEPARTMENT OF THE INTERIOR MINERALS MANAGEMENT (3000) OIL AND GAS LEASING Cooperative Conservation Provisions § 3105.3 Operating, drilling or development contracts. ...
43 CFR 3105.3 - Operating, drilling or development contracts.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 43 Public Lands: Interior 2 2011-10-01 2011-10-01 false Operating, drilling or development...) BUREAU OF LAND MANAGEMENT, DEPARTMENT OF THE INTERIOR MINERALS MANAGEMENT (3000) OIL AND GAS LEASING Cooperative Conservation Provisions § 3105.3 Operating, drilling or development contracts. ...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Nix, Andrew; Johnson, Derek; Heltzel, Robert
Researchers at the Center for Alternative Fuels, Engines, and Emissions (CAFEE) completed a multi-year program under DE-FE0013689 entitled, “Assessing Fugitive Methane Emissions Impact Using Natural Gas Engines in Unconventional Resource Development.” When drilling activity was high and industry sought to lower operating costs and reduce emissions they began investing in dual fuel and dedicated natural gas engines to power unconventional well equipment. From a review of literature we determined that the prime-movers (or major fuel consumers) of unconventional well development were the service trucks (trucking), horizontal drilling rig (drilling) engines, and hydraulic stimulation pump (fracturing) engines. Based on early findingsmore » from on-road studies we assessed that conversion of prime movers to operate on natural gas could contribute to methane emissions associated with unconventional wells. As such, we collected significant in-use activity data from service trucks and in-use activity, fuel consumption, and gaseous emissions data from drilling and fracturing engines. Our findings confirmed that conversion of the prime movers to operate as dual fuel or dedicated natural gas – created an additional source of methane emissions. While some gaseous emissions were decreased from implementation of these technologies – methane and CO 2 equivalent emissions tended to increase, especially for non-road engines. The increases were highest for dual fuel engines due to methane slip from the exhaust and engine crankcase. Dedicated natural gas engines tended to have lower exhaust methane emissions but higher CO 2 emissions due to lower efficiency. Therefore, investing in currently available natural gas technologies for prime movers will increase the greenhouse gas footprint of the unconventional well development industry.« less
Independent focuses Philippines exploration on Visayan basin
DOE Office of Scientific and Technical Information (OSTI.GOV)
Rillera, F.G.
1995-08-21
Cophil Exploration Corp., a Filipino public company, spearheaded 1995 Philippine oil and gas exploration activity with the start of its gas delineation drilling operations in Libertad, northern Cebu. Cophil and its Australian partners, Coplex Resources NL and PacRim Energy NL, have set out to complete a seven well onshore drilling program within this block this year. The companies are testing two modest shallow gas plays, Libertad and Dalingding, and a small oil play, Maya, all in northern Cebu about 500 km southeast of Manila. Following a short discussion on the geology and exploration history of the Visayan basin, this articlemore » briefly summarizes Cophil`s ongoing Cebu onshore drilling program. Afterwards, discussion focuses on identified exploration opportunities in the basin`s offshore sector.« less
Auto-Gopher-II: an autonomous wireline rotary-hammer ultrasonic drill
NASA Astrophysics Data System (ADS)
Badescu, Mircea; Lee, Hyeong Jae; Sherrit, Stewart; Bao, Xiaoqi; Bar-Cohen, Yoseph; Jackson, Shannon; Chesin, Jacob; Zacny, Kris; Paulsen, Gale L.; Mellerowicz, Bolek; Kim, Daniel
2017-04-01
Developing technologies that would enable future NASA exploration missions to penetrate deeper into the subsurface of planetary bodies for sample collection is of great importance. Performing these tasks while using minimal mass/volume systems and with low energy consumption is another set of requirements imposed on such technologies. A deep drill, called Auto-Gopher II, is currently being developed as a joint effort between JPL's NDEAA laboratory and Honeybee Robotics Corp. The Auto-Gopher II is a wireline rotary-hammer drill that combines formation breaking by hammering using an ultrasonic actuator and cuttings removal by rotating a fluted auger bit. The hammering mechanism is based on the Ultrasonic/Sonic Drill/Corer (USDC) mechanism that has been developed as an adaptable tool for many drilling and coring applications. The USDC uses an intermediate free-flying mass to transform high frequency vibrations of a piezoelectric transducer horn tip into sonic hammering of the drill bit. The USDC concept was used in a previous task to develop an Ultrasonic/Sonic Ice Gopher and then integrated into a rotary hammer device to develop the Auto-Gopher-I. The lessons learned from these developments are being integrated into the development of the Auto- Gopher-II, an autonomous deep wireline drill with integrated cuttings and sample management and drive electronics. Subsystems of the wireline drill are being developed in parallel at JPL and Honeybee Robotics Ltd. This paper presents the development efforts of the piezoelectric actuator, cuttings removal and retention flutes and drive electronics.
Carbonate system at Iheya North in Okinawa Trough~IODP drilling and post drilling environment~
NASA Astrophysics Data System (ADS)
Noguchi, T.; Hatta, M.; Sunamura, M.; Fukuba, T.; Suzue, T.; Kimoto, H.; Okamura, K.
2012-12-01
The Iheya North hydrothermal field in middle Okinawa Trough is covered with thick hemipelagic and volcanic sediment. Geochemical characteristics of Okinawa Trough is to provide abundant of CO2, CH4, NH4, H2, and H2S which originated from magmatic gases, sedimentary organic matters. On this hydrothermal field, a scientific drilling by Integrated Ocean Drilling Program (IODP) Expedition 331 was conducted to investigate metabolically diverse subseafloor microbial ecosystem and their physical and chemical settings. To clarify the spatial distribution of physical condition beneath seafloor around the hydrothermal filed, we focus on the carbonate species analysis to reconstruct in-situ pH, which regulate the diversities of microbial community and mineral composition. We developed the small sample volume dissolved total inorganic carbon (DIC) analyzer and conducted the onboard analysis for the interstitial water during IODP Exp.331. Total alkalinity, boron, phosphate, and ammonium also analyzed for thermodynamic calculation. In this presentation, we represent the spatial distribution of pH beneath the Iheya North hydrothermal field. In addition, we developed a 128 bottles multiple water sampler (ANEMONE) for post drilling environmental monitoring. ANEMONE sampler was deployed on the manned submersible Shinkai 6500 with other chemical sensors (CTD, turbidity, pH, ORP, and H2S), and collected the hydrothermal plume samples every 5 minutes during YK12-05 cruise by R/V Yokosuka (Japan Agency for Marine-Earth Science and Technology, JAMSTEC). DIC concentration of plume samples collected by ANEMONE sampler were analyzed just after submersible retrieve, and nutrients, manganese, density, and total cell counts determination were conducted onshore analysis. Based on these results, we describe the spatial distribution of DIC and carbonate system on Iheya North hydrothermal field (interstitial water, hydrothermal fluid, and hydrothermal plume).
NASA Astrophysics Data System (ADS)
Tobin, H. J.; Hirose, T.; Saffer, D. M.; Toczko, S.; Maeda, L.
2014-12-01
International Ocean Discovery Program (IODP) Expedition 348, the latest advance of the NanTroSEIZE project, started on 13 September 2013 and was completed on 29 January 2014. During Expedition 348, the drilling vessel Chikyu advanced the ultra-deep riser hole at Site C0002, located 80 km offshore of the Kii Peninsula, from a depth of 860 meters below sea floor (mbsf) to 3058.5 mbsf, the world record for the deepest scientific ocean drilling, and cased it for future deepening. The drilling operation successfully obtained data on formation physical properties from logging while drilling (LWD) tools, as well as from lithological analyses of cuttings and core from the interior of the active accretionary prism at the Nankai Trough. IODP Site C0002 is the currently only borehole to access the deep interior of an active convergent margin. Preliminary scientific results of Expedition 348 are as follows: (1) Fine-grained turbiditic mudstones with coarser silty and sandy interbeds, exhibiting steep dips (between ~60 and 90 degrees) are predominant in the prism down to ~3000 mbsf. The biostratigraphic age of the sediments in the lowermost part of the hole is thought to be 9-11 Ma, with an assumed age of accretion of 3-5 Ma. (2) Slickenlined surfaces, deformation bands and mineral veins are present throughout the drilled interval, while well-developed scaly clay fabrics are increasingly observed below ~2200 mbsf. A substantial fault zone with well-developed foliation was successfully cored from the deep interior of the prism at ~2205 mbsf. (3) Porosity generally decreases from ~60% to ~20% from the seafloor to 3000 mbsf. However, physical properties including grain density, electrical conductivity and P-wave velocity suggest fairly homogeneous properties in the interior of the prism between ~2000 and 3000 mbsf. (4) Mud gas analysis during the riser drilling indicates that a source of methane gas shifts from microbial origin to thermogenic at around 2325 mbsf. (5) The maximum horizontal principal stress at ~2200 mbsf is in the NE-SW direction. The inner wedge at ~ 2000 mbsf is currently in a strike-slip stress regime.
Geothermal materials development
NASA Astrophysics Data System (ADS)
Kukacka, L. E.
1991-12-01
Advances in the development of new materials, the commercial availabilities of which are essential for the attainment of Hydrothermal Category Level 1 and 2 Objectives, continue to be made in the Geothermal Materials Development Project. Many successes have already been accrued and the results used commercially. In FY-91, utility company sponsored 'full cost' recovery programs based upon materials technology developed in this project were initiated on topics such as condensing heat exchangers, high temperature composites for utility vaults used in district heating systems, and corrosion resistant coatings for use in oil-fired electric generating processes. In FY-91, the DOE/GD-sponsored R&D project was focused on reducing well drilling, fluid transport and energy conversion costs. Specific activities being performed included lightweight CO2-resistant well cements, chemical systems for lost circulation control, thermally conductive and scale resistant protective linear systems, corrosion mitigation in process components at The Geysers, and elastomer-metal bonding systems needed for use in high temperature well drilling and safety related applications.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Williams, C.V.; Lockwood, G.J.; Normann, R.A.
1999-06-01
The Environmental Measurement-While-Drilling (EMWD) system and Horizontal Directional Drilling (HDD) were successfully demonstrated at the Mock Tank Leak Simulation Site and the Drilling Technology Test Site, Hanford, Washington. The use of directional drilling offers an alternative to vertical drilling site characterization. Directional drilling can develop a borehole under a structure, such as a waste tank, from an angled entry and leveling off to horizontal at the desired depth. The EMWD system represents an innovative blend of new and existing technology that provides the capability of producing real-time environmental and drill bit data during drilling operations. The technology demonstration consisted ofmore » the development of one borehole under a mock waste tank at a depth of {approximately} {minus}8 m ({minus}27 ft.), following a predetermined drill path, tracking the drill path to within a radius of {approximately}1.5 m (5 ft.), and monitoring for zones of radiological activity using the EMWD system. The purpose of the second borehole was to demonstrate the capability of drilling to a depth of {approximately} {minus}21 m ({minus}70 ft.), the depth needed to obtain access under the Hanford waste tanks, and continue drilling horizontally. This report presents information on the HDD and EMWD technologies, demonstration design, results of the demonstrations, and lessons learned.« less
77 FR 57572 - Notice of Arrival on the Outer Continental Shelf
Federal Register 2010, 2011, 2012, 2013, 2014
2012-09-18
... program currently requires NOA information for those vessels, facilities, and Mobile Offshore Drilling... Lendvay, Commercial Vessel Compliance, Foreign and Offshore Vessel Compliance Division (CG-CVC-2), U.S... 2254), which required NOA information for those vessels, facilities and Mobile Drilling Units (MODUs...
Persian Basic Course: Supplement to Volume III. Structural Drills for Lessons 29-38.
ERIC Educational Resources Information Center
Defense Language Inst., Monterey, CA.
A supplement to volume three of a basic course in Persian is presented that is designed for use in the Defense Language Institute's intensive programs for native English speakers. This volume contains structural drills for lessons 29-38. (SW)
OFFICE OCCUPATIONS, INDIVIDUAL INSTRUCTION MATERIALS.
ERIC Educational Resources Information Center
Iowa State Dept. of Public Instruction, Des Moines.
THE 79 ITEMS LISTED IN THIS BIBLIOGRAPHY WERE SELECTED FOR THE BENEFIT OF TEACHER-COORDINATORS OF OFFICE OCCUPATIONS PROGRAMS. EXAMPLES OF MATERIAL INCLUDED ARE A COMBINATION TEXTBOOK-WORKBOOK WHICH PROVIDES TRAINING IN ALPHABETIC INDEXING, A COMBINATION TEXTBOOK-WORKBOOK WHICH CONTAINS PENMANSHIP DRILLS AND DIAGNOSTIC DRILLS, A PAPERBOUND BOOK…
Geothermal Exploration of Newberry Volcano, Oregon
DOE Office of Scientific and Technical Information (OSTI.GOV)
Waibel, Albert F.; Frone, Zachary S.; Blackwell, David D.
Davenport Newberry (Davenport) has completed 8 years of exploration for geothermal energy on Newberry Volcano in central Oregon. Two deep exploration test wells were drilled by Davenport on the west flank of the volcano, one intersected a hydrothermal system; the other intersected isolated fractures with no hydrothermal interconnection. Both holes have bottom-hole temperatures near or above 315°C (600°F). Subsequent to deep test drilling an expanded exploration and evaluation program was initiated. These efforts have included reprocessing existing data, executing multiple geological, geophysical, geochemical programs, deep exploration test well drilling and shallow well drilling. The efforts over the last three yearsmore » have been made possible through a DOE Innovative Exploration Technology (IET) Grant 109, designed to facilitate innovative geothermal exploration techniques. The combined results of the last 8 years have led to a better understanding of the history and complexity of Newberry Volcano and improved the design and interpretation of geophysical exploration techniques with regard to blind geothermal resources in volcanic terrain.« less
Performance test of different 3.5 mm drill bits and consequences for orthopaedic surgery.
Clement, Hans; Zopf, Christoph; Brandner, Markus; Tesch, Norbert P; Vallant, Rudolf; Puchwein, Paul
2015-12-01
Drilling of bones in orthopaedic and trauma surgery is a common procedure. There are yet no recommendations about which drill bits/coating should be preferred and when to change a used drill bit. In preliminary studies typical "drilling patterns" of surgeons concerning used spindle speed and feeding force were recorded. Different feeding forces were tested and abrasion was analysed using magnification and a scanning electron microscope (SEM). Acquired data were used for programming a friction stir welding machine (FSWM). Four drill bits (a default AISI 440A, a HSS, an AISI 440B and a Zirconium-oxide drill bit) were analysed for abrasive wear after 20/40/60 machine-guided and hand-driven drilled holes. Additionally different drill coatings [diamond-like carbon/grafitic (DLC), titanium nitride/carbide (Ti-N)] were tested. The mean applied feeding force by surgeons was 45 ± 15.6 Newton (N). HSS bits were still usable after 51 drill holes. Both coated AISI 440A bits showed considerable breakouts of the main cutting edge after 20 hand-driven drilled holes. The coated HSS bit showed very low abrasive wear. The non-coated AISI 440B bit had a similar durability to the HSS bits. The ZrO2 dental drill bit excelled its competitors (no considerable abrasive wear at >100 holes). If the default AISI 440A drill bit cannot be checked by 20-30× magnification after surgery, it should be replaced after 20 hand-driven drilled holes. Low price coated HSS bits could be a powerful alternative.
NASA Technical Reports Server (NTRS)
Okon, Avi B.
2010-01-01
The Drill for the Mars Science Laboratory mission is a rotary-percussive sample acquisition device with an emphasis on toughness and robustness to handle the harsh environment on Mars. The unique challenges associated with autonomous drilling from a mobile robot are addressed. A highly compressed development schedule dictated a modular design architecture that satisfies the functional and load requirements while allowing independent development and testing of the Drill subassemblies. The Drill consists of four actuated mechanisms: a spindle that rotates the bit, a chuck that releases and engages bits, a novel voice-coil-based percussion mechanism that hammers the bit, and a linear translation mechanism. The Drill has three passive mechanisms: a replaceable bit assembly that acquires and collects sample, a contact sensor / stabilizer mechanism, and, lastly a flex harness service loop. This paper describes the various mechanisms that makeup the Drill and discusses the solutions to their unique design and development challenges.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Staller, G.E.; Westmoreland, J.J.; Whitlow, G.L.
1998-03-01
Lost circulation, which is the loss of well drilling fluids to the formation while drilling, is a common problem encountered while drilling geothermal wells. The rapid detection of the loss of well drilling fluids is critical to the successful and cost-effective treatment of the wellbore to stop or minimize lost circulation. Sandia National Laboratories has developed an instrument to accurately measure the outflow rate of drilling fluids while drilling. This instrument, the Rolling Float Meter, has been under development at Sandia since 1991 and is now available for utilization by interested industry users. This report documents recent Rolling Float Metermore » design upgrades resulting from field testing and industry input, the effects of ongoing testing and evaluation both in the laboratory and in the field, and the final design package that is available to transfer this technology to industry users.« less
NASA Astrophysics Data System (ADS)
Boswell, R. M.; Collett, T. S.; Frye, M.; McConnell, D.; Shedd, W.; Shelander, D.; Dai, J.; Mrozewski, S.; Guerin, G.; Cook, A.; Dufrene, R.; Godfriaux, P. D.; Roy, R.; Jones, E.
2009-12-01
The Gulf of Mexico gas hydrates Joint Industry Project (the JIP), a cooperative research program between the US Department of Energy and an international industrial consortium under the leadership of Chevron, conducted its “Leg II” logging-while-drilling operations in April and May of 2009. JIP Leg II was intended to expand the existing JIP work from previous emphasis on fine-grained sedimentary systems to the direct evaluation of gas hydrate in sand-dominated reservoirs. The selection of the locations for the JIP Leg II drilling were the result of a geological and geophysical prospecting approach that integrated direct geophysical evidence of gas hydrate-bearing strata with evidence of gas sourcing and migration and occurrence of sand reservoirs within the gas hydrate stability zone. Logging-while-drilling operations included the drilling of seven wells at three sites. The expedition experienced minimal operational problems with the advanced LWD tool string, and successfully managed a number of shallow drilling challenges, including borehole breakouts, and shallow gas and water flows. Two wells drilled in Walker Ridge block 313 (WR-313) confirmed the pre-drill predictions by discovering gas hydrates at high saturations in multiple sand horizons with reservoir thicknesses up to 50 ft. In addition, drilling in WR-313 discovered a thick, strata-bound interval of grain-displacing gas hydrate in shallow fine-grained sediments. Two of three wells drilled in Green Canyon block 955 (GC-955) confirmed the pre-drill prediction of extensive sand occurrence with gas hydrate fill along the crest of a structure with positive indications of gas source and migration. In particular, well GC955-H discovered ~100 ft of gas hydrate in sand at high saturations. Two wells drilled in Alaminos Canyon block 21 (AC-21) confirmed the pre-drill prediction of potential extensive occurrence of gas hydrates in shallow sand reservoirs at low to moderate saturations; however, further data collection and analyses at AC-21 will be needed to better understand the nature of the pore filling material. JIP Leg II fully met its scientific objectives with the collection of abundant high-quality data from gas hydrate bearing sands in the Gulf of Mexico. Ongoing work within the JIP will enable further validation of the geophysical and geological methods used to predict the occurrence of gas hydrate. Expedition results will also support the selection of locations for future JIP drilling, logging and coring operations.
Summary: High Temperature Downhole Motor
DOE Office of Scientific and Technical Information (OSTI.GOV)
Raymond, David W.
2017-10-01
Directional drilling can be used to enable multi-lateral completions from a single well pad to improve well productivity and decrease environmental impact. Downhole rotation is typically developed with a motor in the Bottom Hole Assembly (BHA) that develops drilling power (speed and torque) necessary to drive rock reduction mechanisms (i.e., the bit) apart from the rotation developed by the surface rig. Historically, wellbore deviation has been introduced by a “bent-sub,” located in the BHA, that introduces a small angular deviation, typically less than 3 degrees, to allow the bit to drill off-axis with orientation of the BHA controlled at themore » surface. The development of a high temperature downhole motor would allow reliable use of bent subs for geothermal directional drilling. Sandia National Laboratories is pursuing the development of a high temperature motor that will operate on either drilling fluid (water-based mud) or compressed air to enable drilling high temperature, high strength, fractured rock. The project consists of designing a power section based upon geothermal drilling requirements; modeling and analysis of potential solutions; and design, development and testing of prototype hardware to validate the concept. Drilling costs contribute substantially to geothermal electricity production costs. The present development will result in more reliable access to deep, hot geothermal resources and allow preferential wellbore trajectories to be achieved. This will enable development of geothermal wells with multi-lateral completions resulting in improved geothermal resource recovery, decreased environmental impact and enhanced well construction economics.« less
NASA Astrophysics Data System (ADS)
Hamada, Y.; Saito, S.; Sanada, Y.; Masaki, Y.; Moe, K.; Kido, Y. N.; Kumagai, H.; Takai, K.; Suzuki, K.
2015-12-01
In July of 2014, offshore drillings on Iheya-North Knoll, Okinawa Trough, was executed as part of Next-generation technology for ocean resources survey, which is a research program in Cross-ministerial Strategic Innovation Promotion Program (SIP). In this expedition, logging-while- drilling (LWD) and measuring-while-drilling (MWD) were inserted into 6 holes (C9011 - C9016) to investigate spatial distribution of hydrothermal deposit and geothermal fluid reservoir. Both of these tools included annular pressure-while-drilling (APWD). Annular pressure and temperature were monitored by the APWD to detect possible exceedingly-high-temperature geofluid. In addition, drilling fluid was continuously circulated at sufficient flow rate to protect LWD tools against high temperature (non-stop driller system). At C9012 and C9016, the LWD tool clearly detected pressure and temperature anomaly at 234 meter below the seafloor (mbsf) and 80 mbsf, respectively. Annular pressure and temperature quickly increases at that depth and it would reflect the injection of high-temperature fluid. During the drilling, however, drilling water was continuously circulated at high flow-rate (2600L/min) and the measured temperature is not exactly in-situ temperature. To investigate the detail of the heat source, such as in-situ temperature and quantity of heat, we performed numerical analyses of thermal fluid and energy-balance assuming injection of high-temperature fluid. We combined pressure loss theory of double cylinders and temperature equation to replicate the fluid flow and its temperature between borehole wall and drilling pipe during the thermofluid injection. As the result, we estimated the temperature and the volume of injected fluid to be 115oC~ and 17.3 m3, respectively (at C9012) from the calculation. This temperature is lower than that of a hydrothermall vent which had been found near the hole (300oC).
NASA Astrophysics Data System (ADS)
Ogasawara, Hiroshi; Durrheim, Raymond; Yabe, Yasuo; Ito, Takatoshi; van Aswegen, Gerrie; Grobbelaar, Michelle; Funato, Akio; Ishida, Akimasa; Ogasawara, Hiroyuki; Mngadi, Siyanda; Manzi, Musa; Ziegler, Martin; Ward, Tony; Moyer, Pamela; Boettcher, Margaret; Ellsworth, Bill; Liebenberg, Bennie; Wechsler, Neta; Onstott, Tullis; Berset, Nicolas
2017-04-01
The International Continental Scientific Drilling Program (ICDP) approved our proposal (Ogasawara et al., EGU 2016) to drill into and around seismogenic zones where critically stressed faults initiated ruptures at depth. The drilling targets include four ruptures equivalent to M2.0, 2.8, 3.5, and 5.5 that dynamically and quasi-statically evolved in 2.9 Ga hard rock in the Witwatersrand basin, South Africa. Major advantages of our drilling locations are the large quantity and high-quality of existing data from dense seismic arrays both on surface and near-field underground in three deep South African gold mines. Additionally, the great depths (1.0 to 3.3 km from surface) to collar holes reduce drilling costs significantly and enable a larger number of holes to be drilled. Flexibility in drilling direction will also allow us to minimize damage in borehole or drilled cores. With the ICDP funds, we will conduct full-core drilling of 16 holes with drilling ranges from 50 to 750 m to recover both materials and fractures in and around the seismogenic zones, followed by core and borehole logging. Additional in-hole monitoring at close proximity will be supported by co-mingled funds and will follow the ICDP drilling. Expected magnitudes of maximum shear stress are several tens of MPa. We have established an overcoring procedure to measure 3D-stress state for adverse underground working conditions so as not to interfere with mining operations. This procedure was optimized based on the Compact Conic-ended Borehole Overcoring (CCBO) technique (ISRM suggested; Sugawara and Obara, 1999). Funato and Ito (2016 IJRMMS) developed a diametrical core deformation analysis (DCDA) method to measure differential stress using only drilled core by assuming diametrical change with roll angles caused by elastic in-axisymmetrical expansion during drilling. A gold mine has already drilled a hole to intersect the hypocenter of a 2016 M3.5 earthquake and carried out the CCBO stress measurement in other holes at the M3.5 seismogenic zone. As we successfully conducted DCDA with the above-mentioned drilled core, we look forward to shedding light on spatial variations of stress in the seismogenic zones following our ICDP DSeis drilling. A M5.5 earthquake which took place near Orkney, South Africa on 5 August 2014, offers a special opportunity to compare seismically inverted spatio-temporal evolution of both the main rupture and the aftershock activity with the information directly probed by the ICDP DSeis project. Moyer et al. (2016 Seismol. Res. Lett. submitted) calls for comparing seismic source models as part of a workshop proposed to the Southern California Earthquake Center for Fall 2017. In addition, the upper edge of the M5.5 rupture is located hundreds of meters below the mining horizon, sufficiently away from anthropogenic activity. This allows geomicrobiologists to investigate deep microbiological activity fueled by H2 from seismic rupture to address questions about Earth's early life. Drilling machines are being rigged underground soon to kick off our ICDP DSeis drilling in early 2017.
NASA Astrophysics Data System (ADS)
Shadrina, A.; Saruev, L.; Vasenin, S.
2016-09-01
This paper addresses the effectiveness of impact energy use in pilot bore directional drilling at pipe driving. We establish and develop new design-engineering principles for this method. These principles are based on a drill string construction with a new nipple thread connection and a generator construction of strain waves transferred through the drill string. The experiment was conducted on a test bench. Strain measurement is used to estimate compression, tensile, shear and bending stresses in the drill string during the propagation of elastic waves. Finally, the main directions of pilot bore directional drilling improvement during pipe driving are determinated. The new engineering design, as components of the pilot bore directional drilling technology are presented.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Oldham, D.W.
Commercial quantities of gas have been produced from shallow sandstone reservoirs of the Fort Union Formation (Paleocene) in the Powder River Basin of Wyoming. The two largest accumulations discovered to date, Oedekoven and Chan pools, were drilled on prospects which invoked differential compaction as a mechanism for gas entrapment and prospect delineation. Gas is believed to have accumulated in localized structural highs early in the burial history of lenticular sands. Structural relief is due to the compaction contrast between sand and stratigraphically-equivalent fine-grained sediments. A shallow Fort Union gas play was based on reports of shallow gas shows, the occurrencemore » of thick coals which could have served as sources for bacterial gas, and the presence of lenticular sandstones which may have promoted the development of compaction structures early in the burial process, to which bacterial gas migrated. Five geologic elements related to compactional trap development were used to rank prospects. Drilling of the Oedekoven prospect, which possessed all prospect elements, led to the discovery of the Oedekoven Fort Union gas pool at a depth of 340 ft (104 m). The uncemented, very fine grained, well-sorted {open_quotes}Canyon sand{close_quotes} pay has extremely high intergranular porosity. Low drilling and completion costs associated with shallow, high-permeability reservoirs, an abundance of subsurface control with which to delineate prospects, and existing gas-gathering systems make Fort Union sandstones attractive primary targets in shallow exploration efforts as well as secondary objectives in deeper drilling programs.« less
Mount Hood exploration, Oregon: a case history
DOE Office of Scientific and Technical Information (OSTI.GOV)
Bowen, R.G.
1981-05-01
An assessment program of Mount Hood is giving information useful for geothermal development in the area and is expected to characterize and aid in exploration of other Cascade volcanoes. These studies have shown the presence of thermal waters coming to the surface around the south flank of the mountain and subsurface flow in other areas. Geothermal gradient drilling shows the average heat flow in the area to be about two times normal increasing toward the summit. Two commercial exploration programs resulting in drilling are underway; Northwest Natural Gas is exploring the west side for direct utilization in the Portland area,more » and Wy'East is exploring near Timberline Lodge on the south flank. On the west side adequate temperatures have been found but the wells have not found enough permeability to be useful. At Timberline Lodge a 4000' well appears to have sufficient temperature, but it has not yet been tested. Further exploration and testing will continue this summer.« less
NASA Technical Reports Server (NTRS)
Copeland, C. S.
1972-01-01
Development of oil film technique to couple power between drive spindle and drill chuck for delicate drilling operations is discussed. Oil film permits application of sufficient pressure, but stops rotating when drill jams. Illustration of equipment is provided.
Commercial geophysical well logs from the USW G-1 drill hole, Nevada Test Site, Nevada
Muller, D.C.; Kibler, J.E.
1983-01-01
Drill hole USW G-1 was drilled at Yucca Mountain, Nevada Test Site, Nevada, as part of the ongoing exploration program for the Nevada Nuclear Waste Storage Investigations. Contract geophysical well logs run at USW G-1 show only limited stratigraphic correlations, but correlate reasonably well with the welding of the ash-flow and ash-fall tuffs. Rocks in the upper part of the section have highly variable physical properties, but are more uniform and predictably lower in the section.
Ocean Drilling Program investigates hydrate ridge
NASA Astrophysics Data System (ADS)
Showstack, Randy
There are several ways to get onboard the JOIDES Resolution, a 143-meter long converted oil tanker that is a floating laboratory, and the pride of the Ocean Drilling Program (ODP). You can meet up with it at a port of call, or set down on its helicopter pad. Or you can hitch a ride by overnight supply boat, and then get lifted by crane to the Resolution by clinging to the outside of a rope transfer basket as this reporter did.
International Ocean Discovery Program U.S. Implementing Organization
coordinates seagoing expeditions to study the history of the Earth recorded in sediments and rocks beneath the Internship :: Minorities in Scientific Ocean Drilling Fellowship Education Deep Earth Academy logo :: joidesresolution.org :: For students :: For teachers :: For scientists :: View drill sites in Google Earth Export
DOT National Transportation Integrated Search
2014-03-01
The work focused on the improvement of FB-DEEPs prediction of skin and tip resistance of concrete : piles and drilled shafts in Florida. For the work, data from 19 concrete pile sites and 18 drilled shaft sites were : collected. This included 458 ...
Code of Federal Regulations, 2011 CFR
2011-07-01
... Greases, and Fish and Marine Mammal Oils; and Vegetable Oils (Including Oils from Seeds, Nuts, Fruits, and... Countermeasure Plan requirements for offshore oil drilling, production, or workover facilities. 112.11 Section 112.11 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER PROGRAMS OIL...
ERIC Educational Resources Information Center
Shawsheen Valley Regional Vocational-Technical High School, Billerica, MA.
This manual contains a work sample intended to assess a handicapped student's interest in and to screen interested students into a training program in basic machine shop I. (The course is based on the entry level of the drill press operator.) Section 1 describes the assessment, correlates the work performed and worker traits required for…
Answers from deep inside the Earth; Continental Scientific Drilling at Cajon Pass, California
Russ, D.P.
1989-01-01
Drilling of a 12,000-foot-deep scientific well has been completed at Cajon Pass in southern California to measure crustal properties, to determine crustal structure, and to better understanding the generation of earthquakes along the San Andreas fault. A joint effort of the National Science Foundation (NFS) and the U.S Geological Survey (USGS), the well was begun in November 1986, and is one of the first projects to be undertaken in the new national Continental Scientific Drilling Program. This program aims to enchance our knowledge of the compostiion, sturcture, dynamics, and evolution of the continental crust and of how these factors affect the origin and distribution of mineral and energy resources and natural phenomena such as volcanic eruptions and earthquakes.
He, Jiang-Fu; Liang, Yun-Pei; Li, Li-Jia; Luo, Yong-Jiang
2018-01-01
Rapid horizontal directional well drilling in hard or fractured formations requires efficient drilling technology. The penetration rate of conventional hard rock drilling technology in horizontal directional well excavations is relatively low, resulting in multiple overgrinding of drill cuttings in bottom boreholes. Conventional drilling techniques with reamer or diamond drill bit face difficulties due to the long construction periods, low penetration rates, and high engineering costs in the directional well drilling of hard rock. To improve the impact energy and penetration rate of directional well drilling in hard formations, a new drilling system with a percussive and rotary drilling technology has been proposed, and a hydro-hammer with a jet actuator has also been theoretically designed on the basis of the impulse hydro-turbine pressure model. In addition, the performance parameters of the hydro-hammer with a jet actuator have been numerically and experimentally analyzed, and the influence of impact stroke and pumped flow rate on the motion velocity and impact energy of the hydro-hammer has been obtained. Moreover, the designed hydro-hammer with a jet actuator has been applied to hard rock drilling in a trenchless drilling program. The motion velocity of the hydro-hammer ranges from 1.2 m/s to 3.19 m/s with diverse flow rates and impact strokes, and the motion frequency ranges from 10 Hz to 22 Hz. Moreover, the maximum impact energy of the hydro-hammer is 407 J, and the pumped flow rate is 2.3 m3/min. Thus, the average penetration rate of the optimized hydro-hammer improves by over 30% compared to conventional directional drilling in hard rock formations.
He, Jiang-fu; Li, Li-jia; Luo, Yong-jiang
2018-01-01
Rapid horizontal directional well drilling in hard or fractured formations requires efficient drilling technology. The penetration rate of conventional hard rock drilling technology in horizontal directional well excavations is relatively low, resulting in multiple overgrinding of drill cuttings in bottom boreholes. Conventional drilling techniques with reamer or diamond drill bit face difficulties due to the long construction periods, low penetration rates, and high engineering costs in the directional well drilling of hard rock. To improve the impact energy and penetration rate of directional well drilling in hard formations, a new drilling system with a percussive and rotary drilling technology has been proposed, and a hydro-hammer with a jet actuator has also been theoretically designed on the basis of the impulse hydro-turbine pressure model. In addition, the performance parameters of the hydro-hammer with a jet actuator have been numerically and experimentally analyzed, and the influence of impact stroke and pumped flow rate on the motion velocity and impact energy of the hydro-hammer has been obtained. Moreover, the designed hydro-hammer with a jet actuator has been applied to hard rock drilling in a trenchless drilling program. The motion velocity of the hydro-hammer ranges from 1.2 m/s to 3.19 m/s with diverse flow rates and impact strokes, and the motion frequency ranges from 10 Hz to 22 Hz. Moreover, the maximum impact energy of the hydro-hammer is 407 J, and the pumped flow rate is 2.3 m3/min. Thus, the average penetration rate of the optimized hydro-hammer improves by over 30% compared to conventional directional drilling in hard rock formations. PMID:29768421
Naish, T.R.; Powell, R.D.; Barrett, P.J.; Levy, R.H.; Henrys, S.; Wilson, G.S.; Krissek, L.A.; Niessen, F.; Pompilio, M.; Ross, J.; Scherer, R.; Talarico, F.; Pyne, A.; ,
2007-01-01
Because of the paucity of exposed rock, the direct physical record of Antarctic Cenozoic glacial history has become known only recently and then largely from offshore shelf basins through seismic surveys and drilling. The number of holes on the continental shelf has been small and largely confined to three areas (McMurdo Sound, Prydz Bay, and Antarctic Peninsula), but even in McMurdo Sound, where Oligocene and early Miocene strata are well cored, the late Cenozoic is poorly known and dated. The latest Antarctic geological drilling program, ANDRILL, successfully cored a 1285-m-long record of climate history spanning the last 13 m.y. from subsea-floor sediment beneath the McMurdo Ice Shelf (MIS), using drilling systems specially developed for operating through ice shelves. The cores provide the most complete Antarctic record to date of ice-sheet and climate fluctuations for this period of Earth’s history. The >60 cycles of advance and retreat of the grounded ice margin preserved in the AND-1B record the evolution of the Antarctic ice sheet since a profound global cooling step in deep-sea oxygen isotope records ~14 m.y.a. A feature of particular interest is a ~90-m-thick interval of diatomite deposited during the warm Pliocene and representing an extended period (~200,000 years) of locally open water, high phytoplankton productivity, and retreat of the glaciers on land.
ERIC Educational Resources Information Center
Van Campen, Joseph A.
Computer software for programed language instruction, developed in the second quarter of 1970 at Stanford's Institute for Mathematical Studies in the Social Sciences is described in this report. The software includes: (1) a PDP-10 computer assembly language for generating drill sentences; (2) a coding system allowing a large number of sentences to…
ERIC Educational Resources Information Center
Erkfritz-Gay, Karyn N.
2009-01-01
Past research has documented that the effectiveness of three different math strategies delivered to students via one-on-one instruction (i.e., cover-copy-compare (CCC); e.g., Skinner, Turco, Beatty, & Rasavage, 1989, traditional drill and practice (TDP); e.g., Cybriwsky & Schuster, 1990, and constant time delay (CTD); Kulik, 1994). This study…
A Lift-Off-Tolerant Magnetic Flux Leakage Testing Method for Drill Pipes at Wellhead.
Wu, Jianbo; Fang, Hui; Li, Long; Wang, Jie; Huang, Xiaoming; Kang, Yihua; Sun, Yanhua; Tang, Chaoqing
2017-01-21
To meet the great needs for MFL (magnetic flux leakage) inspection of drill pipes at wellheads, a lift-off-tolerant MFL testing method is proposed and investigated in this paper. Firstly, a Helmholtz coil magnetization method and the whole MFL testing scheme are proposed. Then, based on the magnetic field focusing effect of ferrite cores, a lift-off-tolerant MFL sensor is developed and tested. It shows high sensitivity at a lift-off distance of 5.0 mm. Further, the follow-up high repeatability MFL probing system is designed and manufactured, which was embedded with the developed sensors. It can track the swing movement of drill pipes and allow the pipe ends to pass smoothly. Finally, the developed system is employed in a drilling field for drill pipe inspection. Test results show that the proposed method can fulfill the requirements for drill pipe inspection at wellheads, which is of great importance in drill pipe safety.
A Lift-Off-Tolerant Magnetic Flux Leakage Testing Method for Drill Pipes at Wellhead
Wu, Jianbo; Fang, Hui; Li, Long; Wang, Jie; Huang, Xiaoming; Kang, Yihua; Sun, Yanhua; Tang, Chaoqing
2017-01-01
To meet the great needs for MFL (magnetic flux leakage) inspection of drill pipes at wellheads, a lift-off-tolerant MFL testing method is proposed and investigated in this paper. Firstly, a Helmholtz coil magnetization method and the whole MFL testing scheme are proposed. Then, based on the magnetic field focusing effect of ferrite cores, a lift-off-tolerant MFL sensor is developed and tested. It shows high sensitivity at a lift-off distance of 5.0 mm. Further, the follow-up high repeatability MFL probing system is designed and manufactured, which was embedded with the developed sensors. It can track the swing movement of drill pipes and allow the pipe ends to pass smoothly. Finally, the developed system is employed in a drilling field for drill pipe inspection. Test results show that the proposed method can fulfill the requirements for drill pipe inspection at wellheads, which is of great importance in drill pipe safety. PMID:28117721
A Proposed Borehole Scientific Laboratory in Quay County, New Mexico, USA
NASA Astrophysics Data System (ADS)
Nielson, Dennis; Eckels, Marc; Mast, Peter; Zellman, Mark; Creed, Robert
2017-04-01
Our team has received funding from the US Department of Energy to initiate a Deep Borehole Field Test that will develop a subsurface test site to evaluate the drilling and scientific aspects of deep borehole disposal of nuclear waste in crystalline rock. Phase 1 of the project will focus on Public Outreach and land acquisition whereas Phase 2 will generate a drilling and testing plan and secure regulatory approvals. Phase 3 will complete the Drilling and Testing Plan and Phase 4 will include the drilling and testing. Phase 5 will be devoted to borehole science and experiments with emplacement technology. Although we are specifically considering issues associated with the disposal of waste, this project is a proof of concept, and no waste will be emplaced at our site. In brief, the concept envisions an 8-1/2 inch open-hole completion at a depth of 5000 m in crystalline rock. There will be an extensive program of sample collection (including core) and analysis as well as geophysical logging and borehole testing. Critical issues will be low permeability in the crystalline rock as well as the ability to manage borehole quality. Our team has proposed a site in Quay County, New Mexico that has an 850 meter thick Paleozoic section overlying homogeneous Precambrian granite. A subsequent phase of the project may drill a second hole with a 17-1/2 inch completion located about 200 m from the first. Our long-term plan is that this site will be managed as a deep scientific observatory that also provides a facility for scientific experiments and testing of borehole infrastructure and drilling equipment.
NASA Astrophysics Data System (ADS)
Hamada, Y.; Yamada, Y.; Sanada, Y.; Nakamura, Y.; Kido, Y. N.; Moe, K.
2017-12-01
Gas hydrates bearing layer can be normally identified by a basement simulating reflector (BSR) or well logging because of their high acoustic- and electric impedance compared to the surrounding formation. These characteristics of the gas hydrate can also represent contrast of in-situ formation strength. We here attempt to describe gas hydrate bearing layers based on the equivalent strength (EST). The Indian National Gas Hydrate Program (NGHP) Expedition 02 was executed 2015 off the eastern margin of the Indian Peninsula to investigate distribution and occurrence of gas hydrates. From 25 drill sites, downhole logging data, cored samples, and drilling performance data were collected. Recorded drilling performance data was converted to the EST, which is a developed mechanical strength calculated only by drilling parameters (top drive torque, rotation per minute , rate of penetration , and drill bit diameter). At a representative site, site 23, the EST shows constant trend of 5 to 10 MPa, with some positive peaks at 0 - 270 mbsf interval, and sudden increase up to 50 MPa above BSR depth (270 - 290 mbsf). Below the BSR, the EST stays at 5-10 MPa down to the bottom of the hole (378 mbsf). Comparison of the EST with logging data and core sample description suggests that the depth profiles of the EST reflect formation lithology and gas hydrate content: the EST increase in the sand-rich layer and the gas hydrate bearing zone. Especially in the gas hydrate zone, the EST curve indicates approximately the same trend with that of P-wave velocity and resistivity measured by downhole logging. Cross plot of the increment of the EST and resistivity revealed the relation between them is roughly logarithmic, indicating the increase and decrease of the EST strongly depend on the saturation factor of gas hydrate. These results suggest that the EST, proxy of in-situ formation strength, can be an indicator of existence and amount of the gas-hydrate layer. Although the EST was calculated after drilling utilizing recorded surface drilling parameter in this study, the EST can be acquired during drilling by using real-time drilling parameters. In addition, the EST only requires drilling performance parameters without any additional tools or measurements, making it a simplified and economical tool for the exploration of gas hydrates.
NASA Astrophysics Data System (ADS)
Sangiorgi, Francesca; Willmott, Veronica; Kim, Jung-Hyun; Schouten, Stefan; Brinkhuis, Henk; Sinninghe Damsté, Jaap S.; Florindo, Fabio; Harwood, David; Naish, Tim; Powell, Ross
2010-05-01
During the austral summers 2006 and 2007 the ANtarctic DRILLing Program (ANDRILL) drilled two cores, each recovering more than 1000m of sediment from below the McMurdo Ice-Shelf (MIS, AND-1B), and sea-ice in Southern McMurdo Sound (SMS, AND-2A), respectively, revealing new information about Neogene Antarctic cryosphere evolution. Core AND-1B was drilled in a more distal location than core AND-2A. With the aim of obtaining important information for the understanding of the history of Antarctic climate and environment during selected interval of the Neogene, we applied novel organic geochemistry proxies such as TEX86 (Tetra Ether IndeX of lipids with 86 carbon atoms) using a new calibration equation specifically developed for polar areas and based on 116 surface sediment samples collected from polar oceans (Kim et al., subm.), and BIT (Branched and Isoprenoid Tetraether), to derive absolute (sea surface) temperature values and to evaluate the relative contribution of soil organic matter versus marine organic matter, respectively. We will present the state-of-the-art of the methodology applied, discussing its advantages and limitations, and the results so far obtained from the analysis of 60 samples from core AND-2A covering the Miocene Climatic Optimum (and the Mid-late Miocene transition) and of 20 pilot samples from core AND-1B covering the late Pliocene.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Dudleson, B.; Arnold, M.; McCann, D.
Rapid detection of unexpected drilling events requires continuous monitoring of drilling parameters. A major R and D program by a drilling contractor has led to the introduction of a computerized monitoring system on its offshore rigs. System includes advanced color graphics displays and new smart alarms to help both contractor and operator personnel detect and observe drilling events before they would normally be apparent with conventional rig instrumentation. This article describes a module of this monitoring system, which uses expert system technology to detect the earliest stages of drillstring washouts. Field results demonstrate the effectiveness of the smart alarm incorporatedmore » in the system. Early detection allows the driller to react before a twist-off results in expensive fishing operations.« less
Semantic Approaches Applied to Scientific Ocean Drilling Data
NASA Astrophysics Data System (ADS)
Fils, D.; Jenkins, C. J.; Arko, R. A.
2012-12-01
The application of Linked Open Data methods to 40 years of data from scientific ocean drilling is providing users with several new methods for rich-content data search and discovery. Data from the Deep Sea Drilling Project (DSDP), Ocean Drilling Program (ODP) and Integrated Ocean Drilling Program (IODP) have been translated and placed in RDF triple stores to provide access via SPARQL, linked open data patterns, and by embedded structured data through schema.org / RDFa. Existing search services have been re-encoded in this environment which allows the new and established architectures to be contrasted. Vocabularies including computed semantic relations between concepts, allow separate but related data sets to be connected on their concepts and resources even when they are expressed somewhat differently. Scientific ocean drilling produces a wide range of data types and data sets: borehole logging file-based data, images, measurements, visual observations and the physical sample data. The steps involved in connecting these data to concepts using vocabularies will be presented, including the connection of data sets through Vocabulary of Interlinked Datasets (VoID) and open entity collections such as Freebase and dbPedia. Demonstrated examples will include: (i) using RDF Schema for inferencing and in federated searches across NGDC and IODP data, (ii) using structured data in the data.oceandrilling.org web site, (iii) association through semantic methods of age models and depth recorded data to facilitate age based searches for data recorded by depth only.
Lunar Polar Environmental Testing: Regolith Simulant Conditioning
NASA Technical Reports Server (NTRS)
Kleinhenz, Julie
2014-01-01
As ISRU system development approaches flight fidelity, there is a need to test hardware in relevant environments. Extensive laboratory and field testing have involved relevant soil (lunar regolith simulants), but the current design iterations necessitate relevant pressure and temperature conditions. Including significant quantities of lunar regolith simulant in a thermal vacuum chamber poses unique challenges. These include facility operational challenges (dust tolerant hardware) and difficulty maintaining a pre-prepared soil state during pump down (consolidation state, moisture retention).For ISRU purposes, the regolith at the lunar poles will be of most interest due to the elevated water content. To test at polar conditions, the regolith simulant must be doped with water to an appropriate percentage and then chilled to cryogenic temperatures while exposed to vacuum conditions. A 1m tall, 28cm diameter bin of simulant was developed for testing these simulant preparation and drilling operations. The bin itself was wrapped with liquid nitrogen cooling loops (100K) so that the simulant bed reached an average temperature of 140K at vacuum. Post-test sampling was used to determine desiccation of the bed due to vacuum exposure. Depth dependent moisture data is presented from frozen and thawed soil samples.Following simulant only evacuation tests, drill hardware was incorporated into the vacuum chamber to test auguring techniques in the frozen soil at thermal vacuum conditions. The focus of this testing was to produce cuttings piles for a newly developed spectrometer to evaluate. This instrument, which is part of the RESOLVE program science hardware, detects water signatures from surface regolith. The drill performance, behavior of simulant during drilling, and characteristics of the cuttings piles will be offered.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Thomas C. Chidsey Jr; David E. Eby; Laura L. Wray
2003-12-01
Over 400 million barrels (64 million m{sup 3}) of oil have been produced from the shallow-shelf carbonate reservoirs in the Pennsylvanian (Desmoinesian) Paradox Formation in the Paradox Basin, Utah and Colorado. With the exception of the giant Greater Aneth field, the other 100 plus oil fields in the basin typically contain 2 to 10 million barrels (0.3-1.6 million m{sup 3}) of original oil in place. Most of these fields are characterized by high initial production rates followed by a very short productive life (primary), and hence premature abandonment. Only 15 to 25 percent of the original oil in place ismore » recoverable during primary production from conventional vertical wells. An extensive and successful horizontal drilling program has been conducted in the giant Greater Aneth field. However, to date, only two horizontal wells have been drilled in small Ismay and Desert Creek fields. The results from these wells were disappointing due to poor understanding of the carbonate facies and diagenetic fabrics that create reservoir heterogeneity. These small fields, and similar fields in the basin, are at high risk of premature abandonment. At least 200 million barrels (31.8 million m{sup 3}) of oil will be left behind in these small fields because current development practices leave compartments of the heterogeneous reservoirs undrained. Through proper geological evaluation of the reservoirs, production may be increased by 20 to 50 percent through the drilling of low-cost single or multilateral horizontal legs from existing vertical development wells. In addition, horizontal drilling from existing wells minimizes surface disturbances and costs for field development, particularly in the environmentally sensitive areas of southeastern Utah and southwestern Colorado.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Thomas C. Chidsey Jr; David E. Eby; Laura L. Wray
2003-12-01
Over 400 million barrels (64 million m{sup 3}) of oil have been produced from the shallow-shelf carbonate reservoirs in the Pennsylvanian (Desmoinesian) Paradox Formation in the Paradox Basin, Utah and Colorado. With the exception of the giant Greater Aneth field, the other 100 plus oil fields in the basin typically contain 2 to 10 million barrels (0.3-1.6 million m{sup 3}) of original oil in place. Most of these fields are characterized by high initial production rates followed by a very short productive life (primary), and hence premature abandonment. Only 15 to 25 percent of the original oil in place ismore » recoverable during primary production from conventional vertical wells. An extensive and successful horizontal drilling program has been conducted in the giant Greater Aneth field. However, to date, only two horizontal wells have been drilled in small Ismay and Desert Creek fields. The results from these wells were disappointing due to poor understanding of the carbonate facies and diagenetic fabrics that create reservoir heterogeneity. These small fields, and similar fields in the basin, are at high risk of premature abandonment. At least 200 million barrels (31.8 million m{sup 3}) of oil will be left behind in these small fields because current development practices leave compartments of the heterogeneous reservoirs undrained. Through proper geological evaluation of the reservoirs, production may be increased by 20 to 50 percent through the drilling of low-cost single or multilateral horizontal legs from existing vertical development wells. In addition, horizontal drilling from existing wells minimizes surface disturbances and costs for field development, particularly in the environmentally sensitive areas of southeastern Utah and southwestern Colorado.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Thomas C. Chidsey Jr; Craig D. Morgan; Kevin McClure
2003-12-01
Over 400 million barrels (64 million m{sup 3}) of oil have been produced from the shallow-shelf carbonate reservoirs in the Pennsylvanian (Desmoinesian) Paradox Formation in the Paradox Basin, Utah and Colorado. With the exception of the giant Greater Aneth field, the other 100 plus oil fields in the basin typically contain 2 to 10 million barrels (0.3-1.6 million m{sup 3}) of original oil in place. Most of these fields are characterized by high initial production rates followed by a very short productive life (primary), and hence premature abandonment. Only 15 to 25 percent of the original oil in place ismore » recoverable during primary production from conventional vertical wells. An extensive and successful horizontal drilling program has been conducted in the giant Greater Aneth field. However, to date, only two horizontal wells have been drilled in small Ismay and Desert Creek fields. The results from these wells were disappointing due to poor understanding of the carbonate facies and diagenetic fabrics that create reservoir heterogeneity. These small fields, and similar fields in the basin, are at high risk of premature abandonment. At least 200 million barrels (31.8 million m{sup 3}) of oil will be left behind in these small fields because current development practices leave compartments of the heterogeneous reservoirs undrained. Through proper geological evaluation of the reservoirs, production may be increased by 20 to 50 percent through the drilling of low-cost single or multilateral horizontal legs from existing vertical development wells. In addition, horizontal drilling from existing wells minimizes surface disturbances and costs for field development, particularly in the environmentally sensitive areas of southeastern Utah and southwestern Colorado.« less
THIN SECTION DESCRIPTIONS: LITTLE UTE AND SLEEPING UTE FIELDS, MONTEZUMA COUNTY, COLORADO
DOE Office of Scientific and Technical Information (OSTI.GOV)
David E. Eby; Laura L. Wray
2003-12-01
Over 400 million barrels (64 million m{sup 3}) of oil have been produced from the shallow-shelf carbonate reservoirs in the Pennsylvanian (Desmoinesian) Paradox Formation in the Paradox Basin, Utah and Colorado. With the exception of the giant Greater Aneth field, the other 100 plus oil fields in the basin typically contain 2 to 10 million barrels (0.3-1.6 million m{sup 3}) of original oil in place. Most of these fields are characterized by high initial production rates followed by a very short productive life (primary), and hence premature abandonment. Only 15 to 25 percent of the original oil in place ismore » recoverable during primary production from conventional vertical wells. An extensive and successful horizontal drilling program has been conducted in the giant Greater Aneth field in Utah (figure 1). However, to date, only two horizontal wells have been drilled in small Ismay and Desert Creek fields. The results from these wells were disappointing due to poor understanding of the carbonate facies and diagenetic fabrics that create reservoir heterogeneity. These small fields, and similar fields in the basin, are at high risk of premature abandonment. At least 200 million barrels (31.8 million m{sup 3}) of oil will be left behind in these small fields because current development practices leave compartments of the heterogeneous reservoirs undrained. Through proper geological evaluation of the reservoirs, production may be increased by 20 to 50 percent through the drilling of low-cost single or multilateral horizontal legs from existing vertical development wells. In addition, horizontal drilling from existing wells minimizes surface disturbances and costs for field development, particularly in the environmentally sensitive areas of southeastern Utah and southwestern Colorado.« less
Effect of bit wear on hammer drill handle vibration and productivity.
Antonucci, Andrea; Barr, Alan; Martin, Bernard; Rempel, David
2017-08-01
The use of large electric hammer drills exposes construction workers to high levels of hand vibration that may lead to hand-arm vibration syndrome and other musculoskeletal disorders. The aim of this laboratory study was to investigate the effect of bit wear on drill handle vibration and drilling productivity (e.g., drilling time per hole). A laboratory test bench system was used with an 8.3 kg electric hammer drill and 1.9 cm concrete bit (a typical drill and bit used in commercial construction). The system automatically advanced the active drill into aged concrete block under feed force control to a depth of 7.6 cm while handle vibration was measured according to ISO standards (ISO 5349 and 28927). Bits were worn to 4 levels by consecutive hole drilling to 4 cumulative drilling depths: 0, 1,900, 5,700, and 7,600 cm. Z-axis handle vibration increased significantly (p<0.05) from 4.8 to 5.1 m/s 2 (ISO weighted) and from 42.7-47.6 m/s 2 (unweighted) when comparing a new bit to a bit worn to 1,900 cm of cumulative drilling depth. Handle vibration did not increase further with bits worn more than 1900 cm of cumulative drilling depth. Neither x- nor y-axis handle vibration was effected by bit wear. The time to drill a hole increased by 58% for the bit with 5,700 cm of cumulative drilling depth compared to a new bit. Bit wear led to a small but significant increase in both ISO weighted and unweighted z-axis handle vibration. Perhaps more important, bit wear had a large effect on productivity. The effect on productivity will influence a worker's allowable daily drilling time if exposure to drill handle vibration is near the ACGIH Threshold Limit Value. [1] Construction contractors should implement a bit replacement program based on these findings.
75 FR 10501 - Drill Pipe and Drill Collars from China
Federal Register 2010, 2011, 2012, 2013, 2014
2010-03-08
... Pipe and Drill Collars from China Determinations On the basis of the record \\1\\ developed in the... injury by reason of imports from China of drill pipe and drill collars, provided for in subheadings 7304... Government of China.\\2\\ \\1\\ The record is defined in sec. 207.2(f) of the Commission's Rules of Practice and...
Nondestructive web thickness measurement of micro-drills with an integrated laser inspection system
NASA Astrophysics Data System (ADS)
Chuang, Shui-Fa; Chen, Yen-Chung; Chang, Wen-Tung; Lin, Ching-Chih; Tarng, Yeong-Shin
2010-09-01
Nowadays, the electric and semiconductor industries use numerous micro-drills to machine micro-holes in printed circuit boards. The measurement of web thickness of micro-drills, a key parameter of micro-drill geometry influencing drill rigidity and chip-removal ability, is quite important to ensure quality control. Traditionally, inefficiently destructive measuring method is adopted by inspectors. To improve quality and efficiency of the web thickness measuring tasks, a nondestructive measuring method is required. In this paper, based on the laser micro-gauge (LMG) and laser confocal displacement meter (LCDM) techniques, a nondestructive measuring principle of web thickness of micro-drills is introduced. An integrated laser inspection system, mainly consisting of a LMG, a LCDM and a two-axis-driven micro-drill fixture device, was developed. Experiments meant to inspect web thickness of micro-drill samples with a nominal diameter of 0.25 mm were conducted to test the feasibility of the developed laser inspection system. The experimental results showed that the web thickness measurement could achieve an estimated repeatability of ± 1.6 μm and a worst repeatability of ± 7.5 μm. The developed laser inspection system, combined with the nondestructive measuring principle, was able to undertake the web thickness measuring tasks for certain micro-drills.
NASA Astrophysics Data System (ADS)
Fussi, Fabio; Fava, Francesco; Di Mauro, Biagio; Bonomi, Tullia; Fumagalli, Letizia; DI Leo, Margherita; Hamidou Kane, Cheik; Faye, Gayane; Niang, Magatte; Wade, Souleye; Hamidou, Barry; Colombo, Roberto
2015-04-01
In several countries of the world the situation of water supply is still critical, far from the international target defined by United Nations for 2015 (Millenium Development Goals) and producing a huge impact on health and living condition of the population. Manual drilling (it means techniques to drill boreholes for water using human or animal power) is well known and practiced for centuries in many countries. In recent years, it has been considered a potential strategy to increase water access in poor countries and has raised the attention of national governments and international organizations. Manual drilling is applicable only where hydrogeological context is suitable, according to the following conditions: thick layers of unconsolidated sediments and shallow water table. Mapping of zones with suitable hydrogeological context has been carried out in several countries in Africa, but the results have evident limitations; previous methods are based on existing direct data and qualitative experience, leading to unreliable interpretation when direct data are limited. This research aims to develop a methodology to estimate shallow hydrogeological features and asses the distribution of suitable zones for manual drilling through the integration of indirect information obtained from remote sensing and other existing source of data. The research is carried out in two different study areas, in Senegal and Guinea (Western Africa), with semi-arid climate, moderate vegetation cover, unconsolidated sandy and clay deposits overlaying sedimentary and igneous rocks A set of variables have been obtained through processing of three categories of data, listed below: - geology, geomorphology, soil and land cover, obtained from existing thematic maps; - vegetation phenology, apparent thermal inertia, and soil moisture, obtained from analysis of multitemporal optical (MOD13Q1), thermal (MOD11A1), and radar (ASAR) remotely sensed data: -morphometric parameters, obtained from public digital elevation models available (ASTER GDEM and SRTM). These variables have been combined using multivariate statistical methods (e.g. regression and classification trees) in order to study their relationship with hydrogeological parameters of shallow layers (namely thickness of porous aquifer, hydraulic conductivity and depth of water table) and estimate the suitability for manual drilling. Direct hydrogeological data in selected points obtained from semiautomatic analysis of stratigraphic borehole logs have been used in the definition and validation of the model. The results obtained demonstrate the potential of the proposed methodological approach to improve the estimation of manual drilling suitability using public data, widely available worldwide. Therefore, it has considerable potential to be replicated in other countries with limited costs. Furthermore, the maps of suitable zones for manual drilling produced in this research can help the promotion of this technique in Senegal and Guinea by different national and international organizations involved in water supply programs. This research is part of a larger project financed by NERC (National Environment Research Council, UK) in the framework of the program UPGRO (Unlocking the Potential of Groundwater for the Poors), with the collaboration of different partners from Italy, Senegal and Guinea.
17 CFR 229.1205 - (Item 1205) Drilling and other exploratory and development activities.
Code of Federal Regulations, 2010 CFR
2010-04-01
..., disclose: (1) The number of net productive and dry exploratory wells drilled; and (2) The number of net productive and dry development wells drilled. (b) Definitions. For purposes of this Item 1205, the following... an oil or gas well. (2) A productive well is an exploratory, development, or extension well that is...
1992-03-01
compile time, ensuring that operations conducted are appropriate for the object type. Each implementation requires a database known as the program...Finnish bank being developed by Nokia • Oil drilling control system managed by Sedco- Forex * Vigile - an industrial installation supervisor project by...user interface and Oracle database backend control. The software is being developed in Ada under DOD-STD-2167 under OS/2. BELGIUM BATS S.A. Project title
A 3-D wellbore simulator (WELLTHER-SIM) to determine the thermal diffusivity of rock-formations
NASA Astrophysics Data System (ADS)
Wong-Loya, J. A.; Santoyo, E.; Andaverde, J.
2017-06-01
Acquiring thermophysical properties of rock-formations in geothermal systems is an essential task required for the well drilling and completion. Wellbore thermal simulators require such properties for predicting the thermal behavior of a wellbore and the formation under drilling and shut-in conditions. The estimation of static formation temperatures also needs the use of these properties for the wellbore and formation materials (drilling fluids and pipes, cements, casings, and rocks). A numerical simulator (WELLTHER-SIM) has been developed for modeling the drilling fluid circulation and shut-in processes of geothermal wellbores, and for the in-situ determination of thermal diffusivities of rocks. Bottomhole temperatures logged under shut-in conditions (BHTm), and thermophysical and transport properties of drilling fluids were used as main input data. To model the thermal disturbance and recovery processes in the wellbore and rock-formation, initial drilling fluid and static formation temperatures were used as initial and boundary conditions. WELLTHER-SIM uses these temperatures together with an initial thermal diffusivity for the rock-formation to solve the governing equations of the heat transfer model. WELLTHER-SIM was programmed using the finite volume technique to solve the heat conduction equations under 3-D and transient conditions. Thermal diffusivities of rock-formations were inversely computed by using an iterative and efficient numerical simulation, where simulated thermal recovery data sets (BHTs) were statistically compared with those temperature measurements (BHTm) logged in some geothermal wellbores. The simulator was validated using a well-documented case reported in the literature, where the thermophysical properties of the rock-formation are known with accuracy. The new numerical simulator has been successfully applied to two wellbores drilled in geothermal fields of Japan and Mexico. Details of the physical conceptual model, the numerical algorithm, and the validation and application results are outlined in this work.
Ocean Drilling Program: Publication Services: Online Manuscript Submission
products Drilling services and tools Online Janus database Search the ODP/TAMU web site ODP/TAMU Science Operator Home ODP's main web site Publications Policy Author Instructions Scientific Results Manuscript use the submission and review forms available on the IODP-USIO publications web site. ODP | Search
Ocean Drilling Program: TAMRF Administrative Services: Meeting, Travel, and
Port-Call Information ODP/TAMU Science Operator Home Mirror sites ODP/TAMU staff Cruise information Science and curation services Publication services and products Drilling services and tools Online ODP Meeting, Travel, and Port-Call Information All ODP meeting and port-call activities are complete
Ocean Drilling Program: Web Site Access Statistics
and products Drilling services and tools Online Janus database Search the ODP/TAMU web site ODP's main See statistics for JOIDES members. See statistics for Janus database. 1997 October November December accessible only on www-odp.tamu.edu. ** End of ODP, start of IODP. Privacy Policy ODP | Search | Database
Code of Federal Regulations, 2011 CFR
2011-07-01
... Marine Mammal Oils; and Vegetable Oils (Including Oils from Seeds, Nuts, Fruits, and Kernels) § 112.10... Countermeasure Plan requirements for onshore oil drilling and workover facilities. 112.10 Section 112.10 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER PROGRAMS OIL POLLUTION PREVENTION...
Code of Federal Regulations, 2010 CFR
2010-07-01
... Marine Mammal Oils; and Vegetable Oils (Including Oils from Seeds, Nuts, Fruits, and Kernels) § 112.10... Countermeasure Plan requirements for onshore oil drilling and workover facilities. 112.10 Section 112.10 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER PROGRAMS OIL POLLUTION PREVENTION...
Coso: Example of a Complex Geothermal Reservoir.
1985-09-01
regarding the structural setting, origin, and internal structure of this energy resource. Because of accelerating exploration and development drilling that is... drilling targets and productivity estimates that can be tested as the resource is developed. Like virtually all resources, Coso will be drilled and tested...73 47. Idealized Cross Section Through Red Mountain Type of Pipe ................... 74 48. Results of Drilling Wells 75-7, 75A-7, 75B-7, 15-8, and
NASA Astrophysics Data System (ADS)
DeBlois, Elisabeth M.; Kiceniuk, Joe W.; Paine, Michael D.; Kilgour, Bruce W.; Tracy, Ellen; Crowley, Roger D.; Williams, Urban P.; Gregory Janes, G.
2014-12-01
This paper presents results of analyses of body burdens of metals and hydrocarbons, and taste tests for taint, in Iceland scallop and American plaice performed as part of the Environmental Effects Monitoring (EEM) program for the Terra Nova offshore oil development (Grand Banks of Newfoundland, Canada). Scallop and plaice were collected in a Study Area located within approximately 1 km of drill centres at Terra Nova and in a Reference Area located approximately 20 km from the development. Samples were collected in 1997 to establish a baseline, and from 2000 to 2010, during drilling periods. Scallop adductor muscle tissue was contaminated with >C10-C21 aliphatic hydrocarbons resembling the drilling fluid in the synthetic drilling mud (SBM) used at Terra Nova in 2000, 2002 and 2004, but contamination of adductor muscle was not noted in 2006, 2008 and 2010. The maximum concentration in muscle was 28 mg/kg wet weight, noted in 2002. Scallop viscera was contaminated with hydrocarbons resembling drilling fluid in SBMs near drill centres in all EEM years except 2010. Viscera contamination with >C10-C21 hydrocarbons gradually decreased from a maximum of 150 mg/kg in 2000, to a maximum of 27 mg/kg in 2008; all values were below the laboratory reporting detection limit of 15 mg/kg in 2010. Therefore, evidence from both muscle and viscera indicates a decrease in tissue hydrocarbon contamination in recent years. Barium, another major constituent in drilling muds, has not been noted in scallop adductor muscles at concentrations above the reporting detection limit, but barium was detected in viscera in baseline and EEM years. The maximum concentration of barium in viscera during baseline sampling was 8 mg/kg. The maximum concentration in EEM years (29 mg/kg) was noted in 2000. The maximum concentration in 2010 was 25 mg/kg. The concentration of metals other than barium in scallop tissues was similar between the Terra Nova Study Area and the Reference Area. Hydrocarbons resembling the fluid in SBMs were noted in one American plaice liver sample collected near drill centres in 2000. Otherwise, there has been no evidence of project-related metals or hydrocarbon contamination in plaice liver or fillet samples. There has been no evidence of taint (off-taste) for scallop adductor muscle and plaice fillet tissue in baseline or EEM years. Combined with a parallel study on fish bioindicators at Terra Nova that showed that fish health at Terra Nova was similar to that at the Reference Area (Mathieu et al., 2011), these results indicate little to no detectable biological effects on Iceland scallop and American plaice as a result of Terra Nova activities.
Laser Drilling Development Trial Final Report CRADA No. TSB-1538-98
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hermann, M. R.; Hebbar, R. R.
This project performed various laser drilling tests to demonstrate femtosecond laser drilling of fuel injector nozzles with minimal recast, minimal heat affected zone and no collateral damage. LLNL had extensive experience in ultra short-pulse laser systems and developed specialized hardware for these applications.
The effects of drilling muds on marine invertebrate larvae and adults
DOE Office of Scientific and Technical Information (OSTI.GOV)
Raimondi, P.T.; Barnett, A.M.; Krause, P.R.
1997-06-01
A series of laboratory experiments tested the effects of drilling muds from an active platform off southern California on larvae and adults of marine invertebrates. Red abalone (Haliotis rufescens) were used to determine effects of drilling muds on fertilization, early development, survivorship, and settlement, and experiments on adult brown cup corals (Paracyathus stearnsii) tested effects on adult survivorship, viability, and tissue loss. Exposures to drilling muds did not have an effect on abalone fertilization or early development. However, several exposures to drilling muds resulted in weak, but significant, positive effects of drilling muds on settlement of competent larvae. In contrast,more » settlement of red abalone larvae on natural coralline algal crusts decreased with increasing concentrations of drilling muds. This suggests that drilling muds affect either the abalone`s ability to detect natural settlement inducers, or they affect the inducer itself. Exposure of brown cup corals to concentrations of drilling muds adversely impacted their survivorship and viability. These effects were likely caused by increased tissue mortality of the coral polyps.« less
A Universal Rig for Supporting Large Hammer Drills: Reduced Injury Risk and Improved Productivity
Rempel, David; Barr, Alan
2015-01-01
Drilling holes into concrete with heavy hammer and rock drills is one of the most physically demanding tasks performed in commercial construction and poses risks for musculoskeletal disorders, noise induced hearing loss, hand arm vibration syndrome and silicosis. The aim of this study was to (1) use a participatory process to develop a rig to support pneumatic rock drills or large electric hammer drills in order to reduce the health risks and (2) evaluate the usability of the rig. Seven prototype rigs for supporting large hammer drills were developed and modified with feedback from commercial contractors and construction workers. The final design was evaluated by laborers and electricians (N=29) who performed their usual concrete drilling with the usual method and the new rig. Subjective regional fatigue was significantly less in the neck, shoulders, hands and arms, and lower back) when using the universal rig compared to the usual manual method. Usability ratings for the rig were significantly better than the usual method on stability, control, drilling, accuracy, and vibration. Drilling time was reduced by approximately 50% with the rig. Commercial construction contractors, laborers and electricians who use large hammer drills for drilling many holes should consider using such a rig to prevent musculoskeletal disorders, fatigue, and silicosis. PMID:26005290
Preliminary Research on Possibilities of Drilling Process Robotization
NASA Astrophysics Data System (ADS)
Pawel, Stefaniak; Jacek, Wodecki; Jakubiak, Janusz; Zimroz, Radoslaw
2017-12-01
Nowadays, drilling & blasting is crucial technique for deposit excavation using in hard rock mining. Unfortunately, such approach requires qualified staff to perform, and consequently there is a serious risk related to rock mechanics when using explosives. Negative influence of explosives usage on safety issues of underground mine is a main cause of mining demands related to elimination of people from production area. Other aspects worth taking into consideration are drilling precision according to drilling pattern, blasting effectiveness, improvement of drilling tool reliability etc. In the literature different drilling support solutions are well-known in terms of positioning support systems, anti-jamming systems or cavity detection systems. For many years, teleoperation of drilling process is also developed. Unfortunately, available technologies have so far not fully met the industries expectation in hard rock. Mine of the future is expected to incorporate robotic system instead of current approaches. In this paper we present preliminary research related to robotization of drilling process and possibilities of its application in underground mine condition. A test rig has been proposed. To simulate drilling process several key assumptions have been accepted. As a result, algorithms for automation of drilling process have been proposed and tested on the test rig. Experiences gathered so far underline that there is a need for further developing robotic system for drilling process.
A Ship for Scientific Drilling.
ERIC Educational Resources Information Center
Peterson, M. N. A.; MacTernan, F. C.
1982-01-01
Traces the history and development of the Deep Sea Drilling Project, focusing on the Glomar Challenger, drilling improvements, and international significance. Includes photographs, illustrations, and tables. (DC)
Research and application of borehole structure optimization based on pre-drill risk assessment
NASA Astrophysics Data System (ADS)
Zhang, Guohui; Liu, Xinyun; Chenrong; Hugui; Yu, Wenhua; Sheng, Yanan; Guan, Zhichuan
2017-11-01
Borehole structure design based on pre-drill risk assessment and considering risks related to drilling operation is the pre-condition for safe and smooth drilling operation. Major risks of drilling operation include lost circulation, blowout, sidewall collapsing, sticking and failure of drilling tools etc. In the study, studying data from neighboring wells was used to calculate the profile of formation pressure with credibility in the target well, then the borehole structure design for the target well assessment by using the drilling risk assessment to predict engineering risks before drilling. Finally, the prediction results were used to optimize borehole structure design to prevent such drilling risks. The newly-developed technique provides a scientific basis for lowering probability and frequency of drilling engineering risks, and shortening time required to drill a well, which is of great significance for safe and high-efficient drilling.
LANDSAT-4 TM image data quality analysis for energy-related applications
NASA Technical Reports Server (NTRS)
Wukelic, G. E.; Foote, H. P.
1983-01-01
LANDSAT-4 Thematic Mapper (TM) data performance and utility characteristics from an energy research and technology perspective is evaluated. The program focuses on evaluating applicational implications of using such data, in combination with other digital data, for current and future energy research and technology activities. Prime interest is in using TM data for siting, developing and operating federal energy facilities. Secondary interests involve the use of such data for resource exploration, environmental monitoring and basic scientific initiatives such as in support of the Continental Scientific Drilling Program.
NASA Astrophysics Data System (ADS)
Schmitt, D. R.; Liberty, L. M.; Kessler, J. A.; Kueck, J.; Kofman, R. S.; Bishop, R. A.; Shervais, J. W.; Evans, J. P.; Champion, D. E.
2012-12-01
The recently completed ICDP Hotspot drilling program consisted of drilling of three scientific drill holes each to at least 1800 m depth across the Snake River Plain of Idaho. The three boreholes include i) Kimama: thick sequences of basalt flows with sediment interbeds; ii) Kimberley: near surface basalt flows overlying rhyolite deposits, and iii) Mountain Home: geothermally altered basalts overlain by lacustrine sediments. The program consisted of high resolution 2D surface tied to vertical and walk-a-way borehole seismic profiles and an extensive suite of full waveform sonic, ultrasonic televiewer, electrical resistivity, magnetic susceptibility, and hydrogen index neutron logging. There are a number of highlights out of this work. First, seismic imaging beneath basalt flows is a classic problem in reflection seismology and has long been believed to be due to rapid attenuation of the downgoing seismic pulse. Here, however, we observed strong arrivals at all depths suggesting that seismic energy is penetrating such formations and that issues in imaging may be a result of the heterogeneous nature of the formations. Second, the neutron log responses correlate well with the structure of individual basalt flows. High and low backscattered neutron counts correspond to massive low porosity basalt rock and with the higher porosity and sediment filled flow tops, respectively. Third, the ultrasonic borehole televiewer information is being used to orient the nearly complete sets of core in order to obtain information on the azimuths of natural and drilling induced core fractures. This together with examination of borehole breakouts and drilling induced tensile fractures on the wellbore wall will allow for semi-quantitative stress estimates across the Snake River Plain. Finally, the Mountain Home borehole provides an unique opportunity to study the geothermally altered basalts. There are a number of correlations between, for example, the sonic and electrical logs that must relate to the style of alteration.
NASA Astrophysics Data System (ADS)
Pearson, P. N.; Hudson, W.
2014-12-01
We are currently developing a proposal for a new International Continental Scientific Drilling Program (ICDP) project to recover a stratigraphic and paleoclimatic record from the full succession of Eocene hemipelagic sediments that are now exposed on land in southern Tanzania. Funding for a workshop was provided by ICDP, and the project was advertised in the normal way. A group of about 30 delegates assembled in Dar-es-Salaam for 3 intensive days of discussion, project development, and proposal writing. The event was hosted by the Tanzania Petroleum Development Corporation (TPDC) and was attended by several geologists, geochemists, geophysicists, and micropaleontologists from TPDC and the University of Dar-es-Salaam. International delegates were from Canada, Germany, India, Ireland, Italy, the Netherlands, United Kingdom, and United States (and we also have project partners from Australia, Belgium, and Sweden who were not able to attend). Some of the scientists are veterans of previous scientific drilling in the area, but over half are new on the scene, mostly having been attracted by Tanzania's reputation for world-class paleoclimate archives. Here we outline the broad aims of the proposed drilling and give a flavor of the discussions and the way our proposal developed during the workshop. A video of the workshop with an introduction to the scientific goals and interviews of many of the participants is available at http://vimeo.com/107911777.
A discontinuous melt sheet in the Manson impact structure
NASA Technical Reports Server (NTRS)
Izett, G. A.; Reynolds, R. L.; Rosenbaum, J. G.; Nishi, J. M.
1993-01-01
Petrologic studies of the core recovered from holes drilled in the Manson, Iowa, buried impact structure may unravel the thermal history of the crater-fill debris. We made a cursory examination of about 200 m of core recovered from the M-1 bore hole. The M-1 bore hole was the first of 12 holes drilled as part of a cooperative drilling program between the U.S. Geological Survey and the Iowa Geological Survey Bureau. The M-1 core hole is about 6 km northeast of the center of the impact structure, apparently on the flank of its central peak. We developed a working hypothesis that a 30-m-thick breccia unit within a 53-m-thick unit previously termed the 'crystalline clast breccia with glassy matrix' is part of a discontinuous melt sheet in the crater-fill impact debris. The 30-m-thick breccia unit reached temperatures sufficient to partially melt some small breccia clasts and convert the fine-grained breccia matrix into a silicate melt that cooled to a greenish-black, flinty, microcrystalline rock. The results of the investigation of this unit are presented.
Program for the improvement of downhole drilling motor bearings and seals. Phase V. Final report
DOE Office of Scientific and Technical Information (OSTI.GOV)
DeLafosse, P.H.; Tibbitts, G.A.; Black, A.D.
1983-08-01
The work done during the fifth and final phase of a program to improve downhole drilling motor bearing and seals is described. The principal activities in this phase were: (a) testing seals with abrasive-laden mud on the low-pressure side; (b) test second and third generation designs of both elastomeric chevron seals and Teflon U-seals; and (c) testing a full-scale bearing/seal package. Several operating parameters which have a radical effect on seal life were identified, and some promising designs and materials were tested.
STANSBURY ROADLESS AREAS, UTAH.
Sorensen, Martin L.; Kness, Richard F.
1984-01-01
A mineral-resource survey of the Stansbury Roadless Areas, Utah was conducted and showed that there is little likelihood for the occurrence of metallic mineral resources in the areas. Limestone and dolomite underlie approximately 50 acres in the roadless areas and constitute a nonmetallic mineral resource of undetermined value. The oil and gas potential is not known and cannot be assessed without exploratory geophysical and drilling programs. There are no known geothermal resources. An extensive program of geophysical exploration and exploratory drilling would be necessary to determine the potential for oil and gas in the Stansbury Roadless Areas.
Reinvesting in Geosciences at Texas A&M University in the 21st Century
NASA Astrophysics Data System (ADS)
Cifuentes, L. A.; Bednarz, S. W.; Miller, K. C.
2009-12-01
The College of Geosciences at Texas A&M University is implementing a three-prong strategy to build a strong college: 1) reinvesting in signature areas, 2) emphasizing environmental programs, and 3) nurturing a strong multi-disciplinary approach to course, program and research development. The college is home to one of the most comprehensive concentrations of geosciences students (837), faculty (107) and research scientists (32) in the country. Its departments include Atmospheric Sciences, Geography, Geology & Geophysics, and Oceanography. The college is also home to three major research centers: the Integrated Ocean Drilling Program, the Geochemical and Environmental Research Group, and the Texas Sea Grant College Program. During the 1990’s the college experienced a 20 percent loss in faculty when allocation of university funds was based primarily on student credit hour production while research expenditures were deemphasized. As part of Texas A&M University President Robert Gates’ Faculty Reinvestment and the college’s Ocean Drilling and Sustainable Earth Sciences hiring programs, 31 faculty members were hired in the college from 2004 through 2009, representing a significant investment-2.2 million in salaries and 4.6 million in start-up. Concurrent improvements to infrastructure and services important to signature programs included $3.0 million for radiogenic isotope and core imaging facilities and the hiring of a new Director of Student Recruitment. In contrast to faculty hiring in previous decades, the expectation of involvement in multi-disciplinary teaching, learning and research was emphasized during this hiring initiative. Returns on investments to date consist of growth in our environmental programs including new multidisciplinary course offerings, generation of a new research center and significant increases in student enrollment, research expenditures, and output of research and scholarly works. Challenges ahead include providing adequate staff support for the increasing numbers of faculty members, research staff and students, developing effective and sustainable faculty mentoring programs, and managing interdisciplinary programs and faculties.
Drilling Automation Tests At A Lunar/Mars Analog Site
NASA Technical Reports Server (NTRS)
Glass, B.; Cannon, H.; Hanagud, S.; Lee, P.; Paulsen, G.
2006-01-01
Future in-situ lunar/martian resource utilization and characterization, as well as the scientific search for life on Mars, will require access to the subsurface and hence drilling. Drilling on Earth is hard - an art form more than an engineering discipline. The limited mass, energy and manpower in planetary drilling situations makes application of terrestrial drilling techniques problematic. The Drilling Automation for Mars Exploration (DAME) project is developing drilling automation and robotics for projected use in missions to the Moon and Mars in the 2011-15 period. This has been tested recently, drilling in permafrost at a lunar/martian analog site (Haughton Crater, Devon Island, Canada).
NASA Astrophysics Data System (ADS)
Whiteway, Sandra A.; Paine, Michael D.; Wells, Trudy A.; DeBlois, Elisabeth M.; Kilgour, Bruce W.; Tracy, Ellen; Crowley, Roger D.; Williams, Urban P.; Janes, G. Gregory
2014-12-01
This paper discusses toxicity test results on sediments from the Terra Nova offshore oil development. The Terra Nova Field is located on the Grand Banks approximately 350 km southeast of Newfoundland (Canada). The amphipod (Rhepoxynius abronius) survival and solid phase luminescent bacteria (Vibrio fischeri, or Microtox) assays were conducted on sediment samples collected from approximately 50 stations per program year around Terra Nova during baseline (1997), prior to drilling, and in 2000, 2001, 2002, 2004, 2006, 2008 and 2010 after drilling began. The frequency of toxic responses in the amphipod toxicity test was low. Of the ten stations that were toxic in environmental effects monitoring (EEM) years, only one (station 30(FE)) was toxic in more than one year and could be directly attributed to Terra Nova project activities. In contrast, 65 (18%) of 364 EEM samples were toxic to Microtox. Microtox toxicity in EEM years was not related to distance from Terra Nova drill centres or concentrations of >C10-C21 hydrocarbons or barium, the primary constituents of the synthetic-based drill muds used at Terra Nova. Of the variables tested, fines and strontium levels showed the strongest (positive) correlations with toxicity. Neither fines nor strontium levels were affected by drill cuttings discharge at Terra Nova, except at station 30(FE) (and that station was not toxic to Microtox). Benthic macro-invertebrate abundance, richness and diversity were greater in toxic than in non-toxic sediments. Therefore, Microtox responses indicating toxicity were associated with positive biological responses in the field. This result may have been an indirect function of the increased abundance of most invertebrate taxa in less sandy sediments with higher gravel content, where fines and strontium levels and, consequently, toxicity to Microtox were high; or chemical substances released by biodegradation of organic matter, where invertebrates are abundant, may be toxic to Microtox. Given the lack of association between Microtox results and discharge from Terra Nova, coupled with the confounding effects of other variables, the usefulness of Microtox toxicity tests within the context of environmental monitoring for the Terra Nova and, potentially, other offshore oil operations needs to be questioned. The amphipod toxicity tests showed that sediments in the vicinity of discharges of synthetic-based drilling mud cuttings are rarely toxic.
Myers, R.G.; Pinckley, K.M.
1984-01-01
Three test wells, T23, T29, and T30, were drilled in south-central New Mexico as part of a joint military training program sponsored by the U.S. Army in November 1982. Test well T23 was drilled as an exploratory and monitoring well in the proposed Soledad well field at the Fort Bliss Military Reservation. Test wells T29 and T30 were drilled at White Sands Missile Range. Test well T29 was drilled as an observation well in the vicinity of the outfall channel from the sewage treatment plant. Test well T30 was drilled as an observation well for a landfill south of the well site. Information obtained from these wells includes lithologic logs for all wells and borehole-geophysical logs from the cased wells for test wells T29 and T30. (USGS)
Development of lunar drill to take core samples to 100-foot depths
NASA Technical Reports Server (NTRS)
1967-01-01
Lunar drill takes lunar surface cores to depths of 100 feet and is being developed to the samples at greater depths. The wireline drill system has been adapted to operate in the lunar environment by providing a sealed dc motor and solid metallic base lubricants.
DOT National Transportation Integrated Search
2010-11-01
The design method for using a single row, spaced drilled shafts, socketed into a firm rock strata, to stabilize : an unstable slope has been developed in this research. The soil arching due to the presence of spaced : drilled shafts in a slope was ob...
A new drilling method-Earthworm-like vibration drilling.
Wang, Peng; Ni, Hongjian; Wang, Ruihe
2018-01-01
The load transfer difficulty caused by borehole wall friction severely limits the penetration rate and extended-reach limit of complex structural wells. A new friction reduction technology termed "earthworm-like drilling" is proposed in this paper to improve the load transfer of complex structural wells. A mathematical model based on a "soft-string" model is developed and solved. The results show that earthworm-like drilling is more effective than single-point vibration drilling. The amplitude and frequency of the pulse pressure and the installation position of the shakers have a substantial impact on friction reduction and load transfer. An optimization model based on the projection gradient method is developed and used to optimize the position of three shakers in a horizontal well. The results verify the feasibility and advantages of earthworm-like drilling, and establish a solid theoretical foundation for its application in oil field drilling.
Measurement and analysis of thrust force in drilling sisal-glass fiber reinforced polymer composites
NASA Astrophysics Data System (ADS)
Ramesh, M.; Gopinath, A.
2017-05-01
Drilling of composite materials is difficult when compared to the conventional materials because of its in-homogeneous nature. The force developed during drilling play a major role in the surface quality of the hole and minimizing the damages around the surface. This paper focuses the effect of drilling parameters on thrust force in drilling of sisal-glass fiber reinforced polymer composite laminates. The quadratic response models are developed by using response surface methodology (RSM) to predict the influence of cutting parameters on thrust force. The adequacy of the models is checked by using the analysis of variance (ANOVA). A scanning electron microscope (SEM) analysis is carried out to analyze the quality of the drilled surface. From the results, it is found that, the feed rate is the most influencing parameter followed by spindle speed and the drill diameter is the least influencing parameter on the thrust force.
Benefits Analysis of Past Projects. Volume 2. Individual Project Assessments.
1984-11-01
209 S- ..-...-......... a nineteenth century one which had been developed for .he braiding of fire hoses . Project Results The program revealed...was found for protecting the drilling and position sensing optics from expelled metal particles. Process and work-material variables were optimized...HPT vane material. Hastelloy X is a nickel-chromium superalloy used in high temperature sheet metal applications, such as combustion liners and
NASA Astrophysics Data System (ADS)
Delay, Jacques; Rebours, Hervé; Vinsot, Agnès; Robin, Pierre
Andra, the French National Radioactive Waste Management Agency, is constructing an underground test facility to study the feasibility of a radioactive waste disposal in the Jurassic-age Callovo-Oxfordian argillites. This paper describes the processes, the methods and results of a scientific characterization program carried out from the surface via deep boreholes with the aim to build a research facility for radioactive waste disposal. In particular this paper shows the evolution of the drilling programs and the borehole set up due to the refinement of the scientific objectives from 1994 to 2004. The pre-investigation phase on the Meuse/Haute-Marne site started in 1994. It consisted in drilling seven scientific boreholes. This phase, completed in 1996, led to the first regional geological cross-section showing the main geometrical characteristics of the host rock. Investigations on the laboratory site prior to the sinking of two shafts started in November 1999. The sinking of the shafts started in September 2000 with the auxiliary shaft completed in October 2004. The experimental gallery, at a depth of 445 m in the main shaft, was in operation by end 2004. During the construction of the laboratory, two major scientific programs were initiated to improve the existing knowledge of the regional hydrogeological characteristics and to accelerate the process of data acquisition on the shales. The aim of the 2003 hydrogeological drilling program was to determine, at regional scale, the properties of groundwater transport and to sample the water in the Oxfordian and Dogger limestones. The 2003-2004 programs consisted in drilling nine deep boreholes, four of which were slanted, to achieve an accurate definition of the structural features.
Subsurface Formation Evaluation on Mars: Application of Methods from the Oil Patch
NASA Astrophysics Data System (ADS)
Passey, Q. R.
2006-12-01
The ability to drill 10- to 100-meter deep wellbores on Mars would allow for evaluation of shallow subsurface formations enabling the extension of current interpretations of the geologic history of this planet; moreover, subsurface access is likely to provide direct evidence to determine if water or permafrost is present. Methodologies for evaluating sedimentary rocks using drill holes and in situ sample and data acquisition are well developed here on Earth. Existing well log instruments can measure K, Th, and U from natural spectral gamma-ray emission, compressional and shear acoustic velocities, electrical resistivity and dielectric properties, bulk density (Cs-137 or Co-60 source), photoelectric absorption of gamma-rays (sensitive to the atomic number), hydrogen index from epithermal and thermal neutron scattering and capture, free hydrogen in water molecules from nuclear magnetic resonance, formation capture cross section, temperature, pressure, and elemental abundances (C, O, Si, Ca, H, Cl, Fe, S, and Gd) using 14 MeV pulsed neutron activation more elements possible with supercooled Ge detectors. Additionally, high-resolution wellbore images are possible using a variety of optical, electrical, and acoustic imaging tools. In the oil industry, these downhole measurements are integrated to describe potential hydrocarbon reservoir properties: lithology, mineralogy, porosity, depositional environment, sedimentary and structural dip, sedimentary features, fluid type (oil, gas, or water), and fluid amount (i.e., saturation). In many cases it is possible to determine the organic-carbon content of hydrocarbon source rocks from logs (if the total organic carbon content is 1 wt% or greater), and more accurate instruments likely could be developed. Since Martian boreholes will likely be drilled without using opaque drilling fluids (as generally used in terrestrial drilling), additional instruments can be used such as high resolution direct downhole imaging and other surface contact measurements (such as IR spectroscopy and x-ray fluorescence). However, such wellbores would require modification of some instruments since conventional drilling fluids often provide the coupling of the instrument sensors to the formation (e.g., sonic velocity and galvanic resistivity measurements). The ability to drill wellbores on Mars opens up new opportunities for exploration but also introduces additional technical challenges. Currently it is not known if all existing terrestrial logging instruments can be miniaturized sufficiently for a shallow Mars wellbore, but the existing well logging techniques and instruments provide a solid framework on which to build a Martian subsurface evaluation program.
Method for laser drilling subterranean earth formations
Shuck, Lowell Z.
1976-08-31
Laser drilling of subterranean earth formations is efficiently accomplished by directing a collimated laser beam into a bore hole in registry with the earth formation and transversely directing the laser beam into the earth formation with a suitable reflector. In accordance with the present invention, the bore hole is highly pressurized with a gas so that as the laser beam penetrates the earth formation the high pressure gas forces the fluids resulting from the drilling operation into fissures and pores surrounding the laser-drilled bore so as to inhibit deleterious occlusion of the laser beam. Also, the laser beam may be dynamically programmed with some time dependent wave form, e.g., pulsed, to thermally shock the earth formation for forming or enlarging fluid-receiving fissures in the bore.
Search Search Home SH Reference Manual E19 Documentation Program Management Training/Drills Other Dataweb National Water Information System Database SH Reference Manual, E-19 Docs, Program Management
ERIC Educational Resources Information Center
Davis, Shelly J., Ed.; Knaupp, Jon, Ed.
1984-01-01
Reviewed is computer software on: (1) classification of living things, a tutorial program for grades 5-10; and (2) polynomial practice using tiles, a drill-and-practice program for algebra students. (MNS)
Jeong, Seong-Yup; Kim, Jong-Kil; Lee, Kwang-Bok
2016-12-01
Retrograde drilling is a well accepted procedure for osteochondral lesion of the talus and subchondral cyst with intact overlying cartilage. It has good results in most reports. Compared to anterograde drilling, retrograde drilling can protect the integrity of the articular cartilage. The purpose of this study was to evaluate the suitability of using retrograde drilling for osteochondral lesion with subchondral cyst and discuss the mechanism involved in the development of subchondral cyst. We report a 53-year-old man who had complained left ankle pain that lasted over 6 months which was exacerbated by walking. We diagnosed it as osteochondral lesion of the talus with subchondral cyst. Plain X-ray, computed tomography, and magnetic resonance imaging (MRI) of the ankle. He undertook retrograde drilling without debridement of cartilage. After the surgery, the pain had been subsided for 1 year, although arthritic change had progressed. However, after 5 years of retrograde drilling, he revisited our hospital due to severe ankle pain. Plain X-ray and MRI showed arthritic change of the ankle and multiple cystic formation of talus. Retrograde drilling has some problem because this procedure is not theoretically correct when the development of a subchondral cyst in osteochondral lesion of the talus is considered. In addition, retrograde drilling may impair uninjured bone marrow of the talus, resulting in the development of multiple cystic formations.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Arnis Judzis
2004-07-01
This document details the progress to date on the ''OPTIMIZATION OF MUD HAMMER DRILLING PERFORMANCE--A PROGRAM TO BENCHMARK THE VIABILITY OF ADVANCED MUD HAMMER DRILLING'' contract for the quarter starting April 2004 through June 2004. The DOE and TerraTek continue to wait for Novatek on the optimization portion of the testing program (they are completely rebuilding their fluid hammer). The latest indication is that the Novatek tool would be ready for retesting only 4Q 2004 or later. Smith International's hammer was tested in April of 2004 (2Q 2004 report). Accomplishments included the following: (1) TerraTek re-tested the ''optimized'' fluid hammermore » provided by Smith International during April 2004. Many improvements in mud hammer rates of penetration were noted over Phase 1 benchmark testing from November 2002. (2) Shell Exploration and Production in The Hague was briefed on various drilling performance projects including Task 8 ''Cutter Impact Testing''. Shell interest and willingness to assist in the test matrix as an Industry Advisor is appreciated. (3) TerraTek participated in a DOE/NETL Review meeting at Morgantown on April 15, 2004. The discussions were very helpful and a program related to the Mud Hammer optimization project was noted--Terralog modeling work on percussion tools. (4) Terralog's Dr. Gang Han witnessed some of the full-scale optimization testing of the Smith International hammer in order to familiarize him with downhole tools. TerraTek recommends that modeling first start with single cutters/inserts and progress in complexity. (5) The final equipment problem on the impact testing task was resolved through the acquisition of a high data rate laser based displacement instrument. (6) TerraTek provided Novatek much engineering support for the future re-testing of their optimized tool. Work was conducted on slip ring [electrical] specifications and tool collar sealing in the testing vessel with a reconfigured flow system on Novatek's collar.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
William C. Maurer; William J. McDonald; Thomas E. Williams
Underbalanced drilling is experiencing growth at a rate that rivals that of horizontal drilling in the mid-1980s and coiled-tubing drilling in the 1990s. Problems remain, however, for applying underbalanced drilling in a wider range of geological settings and drilling environments. This report addresses developments under this DOE project to develop products aimed at overcoming these problems. During Phase I of the DOE project, market analyses showed that up to 12,000 wells per year (i.e., 30% of all wells) will be drilled underbalanced in the U.S.A. within the next ten years. A user-friendly foam fluid hydraulics model (FOAM) was developed formore » a PC Windows environment during Phase I. FOAM predicts circulating pressures and flow characteristics of foam fluids used in underbalanced drilling operations. FOAM is based on the best available mathematical models, and was validated through comparison to existing models, laboratory test data and field data. This model does not handle two-phase flow or air and mist drilling where the foam quality is above 0.97. This FOAM model was greatly expanded during Phase II including adding an improved foam rheological model and a ''matching'' feature that allows the model to be field calibrated. During Phase I, a lightweight drilling fluid was developed that uses hollow glass spheres (HGS) to reduce the density of the mud to less than that of water. HGS fluids have several advantages over aerated fluids, including they are incompressible, they reduce corrosion and vibration problems, they allow the use of mud-pulse MWD tools, and they eliminate high compressor and nitrogen costs. Phase II tests showed that HGS significantly reduce formation damage with water-based drilling and completion fluids and thereby potentially can increase oil and gas production in wells drilled with water-based fluids. Extensive rheological testing was conducted with HGS drilling and completion fluids during Phase II. These tests showed that the HGS fluids act similarly to conventional fluids and that they have potential application in many areas, including underbalanced drilling, completions, and riserless drilling. Early field tests under this project are encouraging. These led to limited tests by industry (which are also described). Further field tests and cost analyses are needed to demonstrate the viability of HGS fluids in different applications. Once their effectiveness is demonstrated, they should find widespread application and should significantly reduce drilling costs and increase oil and gas production rates. A number of important oilfield applications for HGS outside of Underbalanced Drilling were identified. One of these--Dual Gradient Drilling (DGD) for deepwater exploration and development--is very promising. Investigative work on DGD under the project is reported, along with definition of a large joint-industry project resulting from the work. Other innovative products/applications are highlighted in the report including the use of HGS as a cement additive.« less
NASA Astrophysics Data System (ADS)
Gamage, K.; Screaton, E.
2003-12-01
In this study, we used a one-dimensional model of sedimentation, initial prism loading, and fluid flow to examine the development of overpressures at the toe of the Nankai accretionary complex. A permeability-porosity relationship was established for hemipelagic sediments from laboratory measured permeabilities as an input to the model. Vertical permeabilities were measured for 10 core samples from the Ocean Drilling Program (ODP) Leg 190, Sites 1173 and 1174, from the upper and lower Shikoku Basin facies. Both sites were drilled along the Muroto Transect through the dècollement zone or its equivalent. Site 1173 is located 11 km seaward of the deformation front and it represents the undeformed incoming sediments, where as Site 1174 represents sediments within the proto-thrust zone. Although turbidite-rich sediments dominate the Nankai accretionary prism, the dècollement and underthrust sediments are primarily composed of hemipelagic muds. Using the permeability-porosity relationship, our modeling results indicate excess pore pressures that are greater than 30% of lithostatic pressure at the toe of the prism at a convergence rate of 4cm/yr. These values are slightly lower than previously inferred excess pore pressures estimated from porosity data. Additional runs were conducted to simulate a 10-m thick low permeability barrier at the dècollement where vertical fluid flow is restricted. The low permeability barrier required a permeability less than 1 x 10-19 m2 to generate excess pore pressures greater than 50% of lithostatic pressure. Modeling was further extended to test the significance of variable prism loading rates due to uncertainties in the convergence rate and affects of lateral stress above the dècollement.
India National Gas Hydrate Program Expedition 02 Technical Contributions
NASA Astrophysics Data System (ADS)
Collett, T. S.; Kumar, P.; Shukla, K. M.; Nagalingam, J.; Lall, M. V.; Yamada, Y.; Schultheiss, P. J.; Holland, M.; Waite, W. F.
2017-12-01
The National Gas Hydrate Program Expedition 02 (NGHP-02) was conducted from 3-March-2015 to 28-July-2015 off the eastern coast of India. The primary objective of this expedition was the exploration and discovery of highly saturated gas hydrate occurrences in sand reservoirs that would be targets of future production testing. The first 2 months of the expedition were dedicated to logging while drilling (LWD) operations with a total of 25 holes being drilled and logged. The next 3 months were dedicated to coring operations at 10 of the most promising sites. NGHP-02 downhole logging, coring and formation pressure testing have confirmed the presence of large, highly saturated, gas hydrate accumulations in coarse-grained sand-rich depositional systems throughout the Krishna-Godavari Basin within the regions defined during NGHP-02 as Area-B, Area-C, and Area-E. The nature of the discovered gas hydrate occurrences closely matched pre-drill predictions, confirming the project developed depositional models for the sand-rich depositional facies in the Krishna-Godavari and Mahanadi Basins. The existence of a fully developed gas hydrate petroleum system was established in Area-C of the Krishna-Godavari Basin with the discovery of a large slope-basin interconnected depositional system, including a sand-rich, gas-hydrate-bearing channel-levee prospect at Sites NGHP-02-08 and -09. The acquisition of closely spaced LWD and core holes in the Area-B L1 Block gas hydrate accumulation have provided one of the most complete three-dimensional petrophysical-based views of any known gas hydrate reservoir system in the world. It was concluded that Area-B and Area-C in the area of the greater Krishna-Godavari Basin contain important world-class gas hydrate accumulations and represent ideal sites for consideration of future gas hydrate production testing.
Challenges in Leadership: A Text for U.S. Marine Corps Junior ROTC.
ERIC Educational Resources Information Center
Marine Corps Development and Education Command, Quantico, VA.
The textbook is addressed to seniors in high school Marine Corps Junior Reserve Officer Training Corps (JROTC) programs and deals with leaders and the various situations in which they may function. The first part explains the history of military drill and aspects of modern drill as practiced by military units today. The section on leadership…
30 CFR 256.71 - Directional drilling.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 30 Mineral Resources 2 2011-07-01 2011-07-01 false Directional drilling. 256.71 Section 256.71..., and Extensions § 256.71 Directional drilling. In accordance with an approved exploration plan or development and production plan, a lease may be maintained in force by directional wells drilled under the...
Drilling in bone: modeling heat generation and temperature distribution.
Davidson, Sean R; James, David F
2003-06-01
Thermo-mechanical equations were developed from machining theory to predict heat generation due to drilling and were coupled with a heat transfer FEM simulation to predict the temperature rise and thermal injury in bone during a drilling operation. The rotational speed, feed rate, drill geometry and bone material properties were varied in a parametric analysis to determine the importance of each on temperature rise and therefore on thermal damage. It was found that drill speed, feed rate and drill diameter had the most significant thermal impact while changes in drill helix angle, point angle and bone thermal properties had relatively little effect.
Case history of Yakin field: its development and sand control
DOE Office of Scientific and Technical Information (OSTI.GOV)
Sawolo, N.; Krueger, R.F.; Maly, G.P.
1983-01-01
This paper deals with the development of the Yakin field in East Kalimantan, Indonesia, with emphasis on the sand control methods used. Implementation of an effective sand control program ensured the successful development of this field. Gravel-packed wells had substantially lower production decline rates than the initial completions without gravel packs. Control of sand production also has been demonstrated by the lack of sand problems during the 4 1/2 years since the sand control program was initiated. During this time there have been no submersible pump failures associated with sand production. The successful sand control program was achieved by amore » well-coordinated and cooperative effort of drilling, reservoir engineering, production research, and service company personnel. Establishment of communication among all people involved, starting early in the planning process and continuing through the rig operations to the final production phase, coupled with intensive training at all levels of responsibility, on-site supervision, and quality control were important factors in the success of the development program.« less
NASA Astrophysics Data System (ADS)
Cattadori, M.; Huffman, L. T.; Trummel, B.
2009-12-01
For most educators, the end of a field research experience is truly the beginning. From the knowledge gained and the excitement of living and working in a harsh environment like Antarctica, ARISE (ANDRILL Research Immersion for Science Educators) participants create enhanced learning experiences and resources for their students and for the professional development of other teachers. ANDRILL (Antarctic geological DRILLing) is an multi-national and interdisciplinary research project involving Italy, Germany , New Zealand, and USA. The core concept of its Education and Public Outreach Program is to embed educators as integral members on the science research teams, allowing them to participate in every phase of the mission. Their primary goal is to develop effective and innovative educational approaches for the communication of the scientific and technical aspects of the drilling program. ANDRILL has developed an exemplary teacher research experience model that differs from most by supporting a collaborative team of international educators rather than just one teacher. During the first two years of drilling projects, 2006 and 2007, ANDRILL took 16 educators from 4 countries to Antarctica. From those experiences, a growing collaborative network of polar science educators is nurtured, many valuable resources and examples of professional development have been created, and lessons have been learned and evaluated for future teacher research immersion experiences. An Italian ARISE participant and ANDRILL’s Education and Outreach Coordinator will present how ARISE has been at the core of developing transformational programs and resources in both countries including: [1] Flexhibit, a digital series of climate change materials designed for informal and formal learning environments that have been translated into Italian, German, French, Arabic, Spanish, and New Zealand English, (2) C2S2: Climate Change Student Summits, which provide professional development and resources for teachers and a video summit to bring together students from different latitudes, [3] an Italian network of institutions led by the National Museum of Antarctica, whose focus is the development of a more effective and inspired approach to climate education, [4] progettosmilla.it, an online project involving over 2000 students across Italy, and [5] ICLEEN, an Italian website that will provide translated science education materials for teachers in Italy. Together, the cadre of ARISE participants and the activities they have developed, have raised the profile of ANDRILL’s research activities in multiple areas and have provided much needed information on climate change to a variety of age groups and cultures in a diverse range of learning environments.
Structural mechanics simulations
NASA Technical Reports Server (NTRS)
Biffle, Johnny H.
1992-01-01
Sandia National Laboratory has a very broad structural capability. Work has been performed in support of reentry vehicles, nuclear reactor safety, weapons systems and components, nuclear waste transport, strategic petroleum reserve, nuclear waste storage, wind and solar energy, drilling technology, and submarine programs. The analysis environment contains both commercial and internally developed software. Included are mesh generation capabilities, structural simulation codes, and visual codes for examining simulation results. To effectively simulate a wide variety of physical phenomena, a large number of constitutive models have been developed.
Recent Multidisciplinary Research Initiatives and IODP Drilling in the South China Sea
NASA Astrophysics Data System (ADS)
Lin, J.; Li, C. F.; Wang, P.; Kulhanek, D. K.
2016-12-01
The South China Sea (SCS) is the largest low-latitude marginal sea in the world. Its formation and evolution are linked to the complex continental-oceanic tectonic interaction of the Eurasian, Pacific, and Indo-Australian plates. Despite its relatively small size and short history, the SCS has undergone nearly a complete Wilson cycle from continental break-up to seafloor spreading to subduction, serving as a natural laboratory for studying the linkages between tectonic, volcanic, and oceanic processes. The last several years have witnessed significant progress in investigation of the SCS through comprehensive research programs using multidisciplinary approaches and enhanced international collaboration. The International Ocean Discovery Program (IODP) Expedition 349 drilled and cored five sites in the SCS in 2014. The expedition successfully obtained the first basaltic rock samples of the SCS relict spreading center, discovered large and frequent deep-sea turbidity events, and sampled multiple seamount volcaniclastic layers. In addition, high-resolution near-seafloor magnetic surveys were conducted in the SCS with survey lines passing near some of the IODP drilling sites. Together the IODP drilling and deep-tow magnetic survey results confirmed, for the first time, that the entire SCS basin might have stopped seafloor spreading at similar ages in early Miocene, providing important constraints on marginal sea geodynamic models. In 2007, IODP Expeditions 367 and 368 will drill the northern margin of the SCS to investigate the mechanisms of rifting to spreading processes. Meanwhile, major progress in studying the SCS processes has also been made through comprehensive multidisciplinary programs, for example, the eight-year-long "South China Sea Deep" initiative, which also supports and encourages strong international collaboration. This presentation will highlight the recent multidisciplinary research initiatives in investigation of the SCS and the important role of international collaboration.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Mark B. Murphy
The overall goal of this project is to demonstrate that an advanced development drilling and pressure maintenance program based on advanced reservoir management methods can significantly improve oil recovery. The plan included developing a control area using standard reservoir management techniques and comparing its performance to an area developed using advanced methods. A key goal is to transfer advanced methodologies to oil and gas producers in the Permian Basin and elsewhere, and throughout the US oil and gas industry.
NASA Astrophysics Data System (ADS)
Lofi, J.; Inwood, J.; Proust, J.; Monteverde, D.; Loggia, D.; Basile, C.; Hayashi, T.; Stadler, S.; Fehr, A.; Pezard, P.
2012-12-01
For the first time in the history of international scientific drillings, the Integrated Ocean Drilling Program (IODP) mission-specific platform (MSP) Expedition 313 drilled three 631-755 m-deep boreholes on the middle shelf of a clastic passive margin. This expedition gathered a full set of geophysical data tied to drillcores with 80% of recovery. It offers a unique opportunity to access the internal structure of a siliciclastic system, at scales ranging from the matrix to the margin, and to correlate the geological skeleton with the spatial distribution and salinity of saturating fluids. In addition to the discovery of very low salinity pore water (<3g/l) at depths exceeding 400 m below the middle shelf, this expedition provides evidence for a multi-layered reservoir, with fresh/brackish water intervals alternating vertically with salty intervals. Our observations suggest that the processes controlling salinity distribution are strongly influenced by lithology, porosity and permeability. Saltier pore waters are recovered in less porous, more permeable, intervals whereas fresher pore waters are recovered in more porous, less permeable, intervals. Pore water concentrations are inversely correlated to the Thorium content, with high salinities in low Th intervals (i.e. sandy formations). The transition from fresher to saltier intervals is often marked by cemented horizons acting as permeability barrier. In the lower part of some holes, the salinity varies independently of lithology, suggesting different mechanisms and/or sources of salinity. We have developed a 2D model of permeability distribution along a dip transect of the margin, extrapolated from combined clinoform geometries observed on seismic data and sedimentary facies described on cores. This model clearly illustrates the importance of taking into account the spatial heterogeneity of geological system at several scales. Lithology reflects permeability at a small scale whereas seismic facies and system tracts can be used to infer the reservoir geometry at a larger scale. Four main reservoirs (R1 to R4) that are relatively disconnected have been identified. These are essentially developed in coarse-grained deposits observed either in some clinoform topsets (R4), in upper foresets (R2, R3), or in both of them (R1). R2 to R4 contain salty water while the most proximal reservoir R1, located close to the coastline, is saturated with fresh water, and may form the seaward extension of onshore aquifers. Each of these four reservoirs is separated by confining units of varied thicknesses and of relatively broad spatial extension. At the Expedition 313 drilling sites, the fresh waters stored in confining units have a post-deposition age and may have a fossil origin (Pleistocene low-stands?), whereas saltier water recovered in distal reservoirs (R2 to R4) penetrated at a later stage. Further work must be done to clarify the emplacement mechanisms. Future studies should focus on the inclusion of our 2D permeability model in a groundwater model, in order to examine the specific flow processes that are active in this environment. This research used samples and data provided by the Integrated Ocean Drilling Program (IODP) and the International Continental Scientific Drilling Program (ICDP).
Transient ElectroMagnetic and Electric Self-Potential survey in the TAG hydrothermal field in MAR
NASA Astrophysics Data System (ADS)
Tao, C.; Deng, X.; Wu, G.; Xi, Z.; Zhou, D.; Zuo, L.
2012-12-01
The TAG hydrothermal field is one of the most studied hydrothermal fields. This field covers an area of 5km×5km, which includes low-temperature Mn- and Fe-oxides and nontronites zone, relict massive sulfide mounds as well as active hydrothermal mound(TAG mound) [Thompson, 1985, Rona, 1993]. Drilling program was performed in the ODP (Ocean Drilling Program) Leg 158 in the TAG mound [Humphris, 1996]. In 1996, electrical resistivity survey in the TAG mound was conducted using innovative transient electric dipole-dipole instruments which was carried by DSV 'Alvin' [Cairns et al., 1996, Von Herzen et al., 1996]. In June 2012, the 2nd Leg of the Chinese 26th cruise was carried out in the TAG hydrothermal field at Mid Atlantic Ridge by R/V DAYANGYIHAO. Six TEM (Transient ElectroMagnetic) survey lines were deployed, with four of which across the ODP Leg 158 drilling area. Besides, two SP (Electric Self-Potential) survey lines were across the ODP drilling area. The survey results of TEM preliminary revealed the vertical structure of the TAG hydrothermal field. The survey results of both TEM and SP are consistent with the ODP drilling result, and also agree well with the temperature and water-column anomalies obtained in this leg. Preliminary results show that the TEM and SP methods are capable of revealing the horizontal and vertical distribution of the hydrothermal sulfide fields.
Cortical bone drilling: An experimental and numerical study.
Alam, Khurshid; Bahadur, Issam M; Ahmed, Naseer
2014-12-16
Bone drilling is a common surgical procedure in orthopedics, dental and neurosurgeries. In conventional bone drilling process, the surgeon exerts a considerable amount of pressure to penetrate the drill into the bone tissue. Controlled penetration of drill in the bone is necessary for safe and efficient drilling. Development of a validated Finite Element (FE) model of cortical bone drilling. Drilling experiments were conducted on bovine cortical bone. The FE model of the bone drilling was based on mechanical properties obtained from literature data and additionally conducted microindentation tests on the cortical bone. The magnitude of stress in bone was found to decrease exponentially away from the lips of the drill in simulations. Feed rate was found to be the main influential factor affecting the force and torque in the numerical simulations and experiments. The drilling thrust force and torque were found to be unaffected by the drilling speed in numerical simulations. Simulated forces and torques were compared with experimental results for similar drilling conditions and were found in good agreement.CONCLUSIONS: FE schemes may be successfully applied to model complex kinematics of bone drilling process.
NASA Astrophysics Data System (ADS)
Lee, Sung-rock; Chun, Jong-hwa
2013-04-01
For the baseline study in the monitoring gas hydrate test production in the Ulleung Basin, Korea Institute of Geoscience and Mineral Resources (KIGAM) has developed the KIGAM Seafloor Observation System (KISOS) for seafloor exploration using unmanned remotely operated vehicle connected with a ship by a cable. The KISOS consists of a transponder of an acoustic positioning system (USBL), a bottom finding pinger, still camera, video camera, water sampler, and measuring devices (methane, oxygen, CTD, and turbidity sensors) mounted on the unmanned ROV, and a sediment collecting device collecting sediment on the seafloor. It is very important to monitoring the environmental risks (gas leakage and production water/drilling mud discharge) which may be occurred during the gas hydrate test production drilling. The KISOS will be applied to solely conduct baseline study with the KIGAM seafloor monitoring system (KIMOS) of the Korean gas hydrate program in the future. The large scale of environmental monitoring program includes the environmental impact assessment such as seafloor disturbance and subsidence, detection of methane gas leakage around well and cold seep, methane bubbles and dissolved methane, change of marine environments, chemical factor variation of water column and seabed, diffusion of drilling mud and production water, and biological factors of biodiversity and marine habitats before and after drilling test well and nearby areas. The design of the baseline survey will be determined based on the result of SIMAP simulation in 2013. The baseline survey will be performed to provide the gas leakage and production water/drilling mud discharge before and after gas hydrate test production. The field data of the baseline study will be evaluated by the simulation and verification of SIMAP simulator in 2014. In the presentation, the authors would like introduce the configuration of KISOS and applicability to the seafloor observation for the gas hydrate test production in the Ulleung Basin. This work was financially supported by the the Ministry of Knowledge Economy(MKE) and Gas Hydrate R/D Organization(GHDO)
NASA Astrophysics Data System (ADS)
Rack, F. R.
2005-12-01
The Integrated Ocean Drilling Program (IODP: 2003-2013 initial phase) is the successor to the Deep Sea Drilling Project (DSDP: 1968-1983) and the Ocean Drilling Program (ODP: 1985-2003). These earlier scientific drilling programs amassed collections of sediment and rock cores (over 300 kilometers stored in four repositories) and data organized in distributed databases and in print or electronic publications. International members of the IODP have established, through memoranda, the right to have access to: (1) all data, samples, scientific and technical results, all engineering plans, data or other information produced under contract to the program; and, (2) all data from geophysical and other site surveys performed in support of the program which are used for drilling planning. The challenge that faces the individual platform operators and management of IODP is to find the right balance and appropriate synergies among the needs, expectations and requirements of stakeholders. The evolving model for IODP database services consists of the management and integration of data collected onboard the various IODP platforms (including downhole logging and syn-cruise site survey information), legacy data from DSDP and ODP, data derived from post-cruise research and publications, and other IODP-relevant information types, to form a common, program-wide IODP information system (e.g., IODP Portal) which will be accessible to both researchers and the public. The JANUS relational database of ODP was introduced in 1997 and the bulk of ODP shipboard data has been migrated into this system, which is comprised of a relational data model consisting of over 450 tables. The JANUS database includes paleontological, lithostratigraphic, chemical, physical, sedimentological, and geophysical data from a global distribution of sites. For ODP Legs 100 through 210, and including IODP Expeditions 301 through 308, JANUS has been used to store data from 233,835 meters of core recovered, which are comprised of 38,039 cores, with 202,281 core sections stored in repositories, which have resulted in the taking of 2,299,180 samples for scientists and other users (http://iodp.tamu.edu/janusweb/general/dbtable.cgi). JANUS and other IODP databases are viewed as components of an evolving distributed network of databases, supported by metadata catalogs and middleware with XML workflows, that are intended to provide access to DSDP/ODP/IODP cores and sample-based data as well as other distributed geoscience data collections (e.g., CHRONOS, PetDB, SedDB). These data resources can be explored through the use of emerging data visualization environments, such as GeoWall, CoreWall (http://(www.evl.uic.edu/cavern/corewall), a multi-screen display for viewing cores and related data, GeoWall-2 and LambdaVision, a very-high resolution, networked environment for data exploration and visualization, and others. The U.S Implementing Organization (USIO) for the IODP, also known as the JOI Alliance, is a partnership between Joint Oceanographic Institutions (JOI), Texas A&M University, and Lamont-Doherty Earth Observatory of Columbia University. JOI is a consortium of 20 premier oceanographic research institutions that serves the U.S. scientific community by leading large-scale, global research programs in scientific ocean drilling and ocean observing. For more than 25 years, JOI has helped facilitate discovery and advance global understanding of the Earth and its oceans through excellence in program management.
Clean subglacial access: prospects for future deep hot-water drilling
Pearce, David; Hodgson, Dominic A.; Smith, Andrew M.; Rose, Mike; Ross, Neil; Mowlem, Matt; Parnell, John
2016-01-01
Accessing and sampling subglacial environments deep beneath the Antarctic Ice Sheet presents several challenges to existing drilling technologies. With over half of the ice sheet believed to be resting on a wet bed, drilling down to this environment must conform to international agreements on environmental stewardship and protection, making clean hot-water drilling the most viable option. Such a drill, and its water recovery system, must be capable of accessing significantly greater ice depths than previous hot-water drills, and remain fully operational after connecting with the basal hydrological system. The Subglacial Lake Ellsworth (SLE) project developed a comprehensive plan for deep (greater than 3000 m) subglacial lake research, involving the design and development of a clean deep-ice hot-water drill. However, during fieldwork in December 2012 drilling was halted after a succession of equipment issues culminated in a failure to link with a subsurface cavity and abandonment of the access holes. The lessons learned from this experience are presented here. Combining knowledge gained from these lessons with experience from other hot-water drilling programmes, and recent field testing, we describe the most viable technical options and operational procedures for future clean entry into SLE and other deep subglacial access targets. PMID:26667913
NASA Astrophysics Data System (ADS)
Acton, G. D.; Clement, B. M.; Lund, S. P.; Okada, M.; Williams, T.
2003-04-01
With the advent of the Hydraulic Piston Corer at the end of the Deep Sea Drilling Program and its enhanced successor, the Advanced Piston Corer (APC), developed by the Ocean Drilling Program (ODP), coring through thick (>100 m), rapidly deposited sequences of unconsolidated to partially consolidated sediments with near 100% recovery has become common place. Although much of the emphasis for site selection has been based on paleoceanographic objectives, the impact to the field of paleomagnetism has been dramatic, both in the instruments used to analyze the large quantity of core recovered and in the questions that can be answered concerning geomagnetic field behavior and paleoenvironmental conditions. The largest change has come in the construction of relative paleointensity records, which have provided previously unimagined details about how the geomagnetic field varies in strength during stable polarity intervals as well as during reversals and excursions. These records have allowed more realistic models of the geomagnetic field to be developed while also providing a new chronologic tool for high-resolution dating and global correlation of geomagnetic events. Studies of how the paleomagnetic direction varies through time have not advanced as rapidly and have instead mainly been focused on short time intervals across a few geomagnetic reversals. It should, however, be possible to construct and compare secular variation records with millennial or better resolution that span the past one million years from sites around the world as correlation and chronologies between sites improve. We will give an overview that focuses on secular variation records that are being constructed from sediment drifts drilled in the western North Atlantic during ODP Leg 172. Our results will be used to address questions concerning what percent of time the geomagnetic field is in a stable state versus transitional or excursional states, what the relationship is between directional variability and relative paleointensity, which secular variation features are global and which are local, what is the origin of local directional changes, and how climate and rock magnetic changes influence the paleomagnetic signal.
Deep Drilling Into the Chicxulub Impact Crater: Pemex Oil Exploration Boreholes Revisited
NASA Astrophysics Data System (ADS)
Fucugauchi, J. U.; Perez-Cruz, L.
2007-05-01
The Chicxulub structure was recognized in the 1940´s from gravity anomalies in oil exploration surveys by Pemex. Geophysical anomalies occur over the carbonate platform in NW Yucatan, where density and magnetic susceptibility contrasts with the carbonates suggested a buried igneous complex or basement uplift. The exploration program developed afterwards included several boreholes, starting with the Chicxulub-1 in 1952 and eventually comprising eight deep boreholes completed through the 1970s. The investigations showing Chicxulub as a large impact crater formed at the K/T boundary have relayed on the Pemex decades-long exploration program. Despite frequent reference to Pemex information, original data have not been openly available for detailed evaluation and incorporation with results from recent efforts. Logging data and core samples remain to be analyzed, reevaluated and integrated in the context of recent marine, aerial and terrestrial geophysical surveys and the drilling/coring projects of UNAM and ICDP. In this presentation we discuss the paleontological data, stratigraphic columns and geophysical logs for the Chicxulub-1 (1582m), Sacapuc-1 (1530m), Yucatan-6 (1631m) and Ticul-1 (3575m) boreholes. These boreholes remain the deepest ones drilled in Chicxulub and the only ones providing samples of the melt-rich breccias and melt sheet. Other boreholes include the Y1 (3221m), Y2 (3474m), Y4 (2398m) and Y5A (3003m), which give information on pre-impact stratigraphy and crystalline basement. We concentrate on log and microfossil data, stratigraphic columns, lateral correlation, integration with UNAM and ICDP borehole data, and analyses of sections of melt, impact breccias and basal Paleocene carbonates. Current plans for deep drilling in Chicxulub crater focus in the peak ring zone and central sector, with proposed marine and on-land boreholes to the IODP and ICDP programs. Future ICDP borehole will be located close to Chicxulub-1 and Sacapuc-1, which intersected the impact breccias at about 1 km and the melt and melt- rich breccias at some 1.3-1.4 km.
Counter-Rotating Tandem Motor Drilling System
DOE Office of Scientific and Technical Information (OSTI.GOV)
Kent Perry
2009-04-30
Gas Technology Institute (GTI), in partnership with Dennis Tool Company (DTC), has worked to develop an advanced drill bit system to be used with microhole drilling assemblies. One of the main objectives of this project was to utilize new and existing coiled tubing and slimhole drilling technologies to develop Microhole Technology (MHT) so as to make significant reductions in the cost of E&P down to 5000 feet in wellbores as small as 3.5 inches in diameter. This new technology was developed to work toward the DOE's goal of enabling domestic shallow oil and gas wells to be drilled inexpensively comparedmore » to wells drilled utilizing conventional drilling practices. Overall drilling costs can be lowered by drilling a well as quickly as possible. For this reason, a high drilling rate of penetration is always desired. In general, high drilling rates of penetration (ROP) can be achieved by increasing the weight on bit and increasing the rotary speed of the bit. As the weight on bit is increased, the cutting inserts penetrate deeper into the rock, resulting in a deeper depth of cut. As the depth of cut increases, the amount of torque required to turn the bit also increases. The Counter-Rotating Tandem Motor Drilling System (CRTMDS) was planned to achieve high rate of penetration (ROP) resulting in the reduction of the drilling cost. The system includes two counter-rotating cutter systems to reduce or eliminate the reactive torque the drillpipe or coiled tubing must resist. This would allow the application of maximum weight-on-bit and rotational velocities that a coiled tubing drilling unit is capable of delivering. Several variations of the CRTDMS were designed, manufactured and tested. The original tests failed leading to design modifications. Two versions of the modified system were tested and showed that the concept is both positive and practical; however, the tests showed that for the system to be robust and durable, borehole diameter should be substantially larger than that of slim holes. As a result, the research team decided to complete the project, document the tested designs and seek further support for the concept outside of the DOE.« less
Laser Materials Processing Final Report CRADA No. TC-1526-98
DOE Office of Scientific and Technical Information (OSTI.GOV)
Crane, J.; Lehane, C. J.
2017-09-08
This CRADA project was a joint effort between Lawrence Livermore National Laboratory (LLNL) and United Technologies Corporation (UTC)/Pratt & Whitney (P&W) to demonstrate process capability for drilling holes in turbine airfoils using LLNL-developed femtosecond laser machining technology. The basis for this development was the ability of femtosecond lasers to drill precision holes in variety of materials with little or no collateral damage. The ultimate objective was to develop a laser machine tool consisting of an extremely advanced femtosecond laser subsystem to be developed by LLNL on a best-effort basis and a drilling station for turbine blades and vanes to bemore » developed by P&W. In addition, P&W was responsible for commercializing the system. The goal of the so called Advanced Laser Drilling (ALD) system was to drill specified complex hole-shapes in turbine blades and vanes with a high degree precision and repeatability and simultaneously capable of very high speed processing.« less
Test wells T21, T22, and T25, White Sands Missile Range, Dona Ana County, New Mexico
Myers, R.G.
1983-01-01
Three test wells, T21, T22, and T25, were drilled at White Sands Missile Range in south-central New Mexico as part of a joint military program sponsored by the U.S. Army in September 1982. T21 and T22 were drilled as observation wells for two old landfills. T25 was drilled as an exploratory hole to obtain lithologic and borehole-geophysical data in the vicinity of the proposed replacement well for Supply Well 15. Information obtained from these wells includes borehole-geophysical and driller's logs.
Conducting a 3D Converted Shear Wave Project to Reduce Exploration Risk at Wister, CA
DOE Office of Scientific and Technical Information (OSTI.GOV)
Matlick, Skip; Walsh, Patrick; Rhodes, Greg
2015-06-30
Ormat sited 2 full-size exploration wells based on 3D seismic interpretation of fractures, prior drilling results, and temperature anomaly. The wells indicated commercial temperatures (>300 F), but almost no permeability, despite one of the wells being drilled within 820 ft of an older exploration well with reported indications of permeability. Following completion of the second well in 2012, Ormat undertook a lengthy program to 1) evaluate the lack of observed permeability, 2) estimate the likelihood of finding permeability with additional drilling, and 3) estimate resource size based on an anticipated extent of permeability.
Research into robotic automation of drilling equipment by the Institute of Mining, UB RAS
NASA Astrophysics Data System (ADS)
Regotunov, AS; Sukhov, RI
2018-03-01
The article discusses the issues connected with the development of instrumentation for the express-determination of strength characteristics of rocks during blasthole drilling in open pit mines. The trial results of the instrumentation are reported in terms of the drilling rate–energy content interrelation determined in the analyses of experimental drilling block data and by the digital model of rock distribution in depth versus drilling complexity index.
Study on super-long deep-hole drilling of titanium alloy.
Liu, Zhanfeng; Liu, Yanshu; Han, Xiaolan; Zheng, Wencui
2018-01-01
In this study, the super-long deep-hole drilling of a titanium alloy was investigated. According to material properties of the titanium alloy, an experimental approach was designed to study three issues discovered during the drilling process: the hole-axis deflection, chip morphology, and tool wear. Based on the results of drilling experiments, crucial parameters for the super-long deep-hole drilling of titanium alloys were obtained, and the influences of these parameters on quality of the alloy's machining were also evaluated. Our results suggest that the developed drilling process is an effective method to overcome the challenge of super-long deep-hole drilling on difficult-to-cut materials.
Resonance: The science behind the art of sonic drilling
NASA Astrophysics Data System (ADS)
Lucon, Peter Andrew
The research presented in this dissertation quantifies the system dynamics and the influence of control variables of a sonic drill system. The investigation began with an initial body of work funded by the Department of Energy under a Small Business Innovative Research Phase I Grant, grant number: DE-FG02-06ER84618, to investigate the feasibility of using sonic drills to drill micro well holes to depths of 1500 feet. The Department of Energy funding enabled feasibility testing using a 750 hp sonic drill owned by Jeffery Barrow, owner of Water Development Co. During the initial feasibility testing, data was measured and recorded at the sonic drill head while the sonic drill penetrated to a depth of 120 feet. To demonstrate feasibility, the system had to be well understood to show that testing of a larger sonic drill could simulate the results of drilling a micro well hole of 2.5 inch diameter. A first-order model of the system was developed that produced counter-intuitive findings that enabled the feasibility of using this method to drill deeper and produce micro-well holes to 1500 feet using sonic drills. Although funding was not continued, the project work continued. This continued work expanded on the sonic drill models by understanding the governing differential equation and solving the boundary value problem, finite difference methods, and finite element methods to determine the significance of the control variables that can affect the sonic drill. Using a design of experiment approach and commercially available software, the significance of the variables to the effectiveness of the drill system were determined. From the significant variables, as well as the real world testing, a control system schematic for a sonic drill was derived and is patent pending. The control system includes sensors, actuators, personal logic controllers, as well as a human machine interface. It was determined that the control system should control the resonant mode and the weight on the bit as the primary two control variables. The sonic drill can also be controlled using feedback from sensors mounted on the sonic drill head, which is the driver for the sonic drill located above ground
Field Simulation of a Drilling Mission to Mars to Search for Subsurface Life
NASA Technical Reports Server (NTRS)
Stoker, C. R.; Lemke, L. G.; Cannon, H.; Glass, B.; Dunagan, S.; Zavaleta, J.; Miller, D.; Gomez-Elvira, J.
2005-01-01
The discovery of near surface ground ice by the Mars Odyssey mission and the abundant evidence for recent Gulley features observed by the Mars Global Surveyor mission support longstanding theoretical arguments for subsurface liquid water on Mars. Thus, implementing the Mars program goal to search for life points to drilling on Mars to reach liquid water, collecting samples and analyzing them with instrumentation to detect in situ organisms and biomarker compounds. Searching for life in the subsurface of Mars will require drilling, sample extraction and handling, and new technologies to find and identify biomarker compounds and search for living organisms. In spite of its obvious advantages, robotic drilling for Mars exploration is in its technological infancy and has yet to be demonstrated in even a terrestrial field environment.
Q: How Do Oil and Gas Companies Know Where to Drill?
ERIC Educational Resources Information Center
Robertson, William C.
2010-01-01
Contrary to popular opinion, most oil is not discovered by a backwoods hunter shooting at some food when up through the ground comes bubbling crude (you younger people ask your parents what silly TV program the author is referring to). Neither is it discovered simply by drilling holes randomly to see what you can find. There are several methods,…
Development and Testing of The Lunar Resource Prospector Drill
NASA Astrophysics Data System (ADS)
Zacny, K.; Paulsen, G.; Kleinhenz, J.; Smith, J. T.; Quinn, J.
2017-12-01
The goal of the Lunar Resource Prospector (RP) mission is to capture and identify volatiles species within the top one meter layer of the lunar surface. The RP drill has been designed to 1. Generate cuttings and place them on the surface for analysis by the Near InfraRed Volatiles Spectrometer Subsystem (NIRVSS), and 2. Capture cuttings and transfer them to the Oxygen and Volatile Extraction Node (OVEN) coupled with the Lunar Advanced Volatiles Analysis (LAVA) subsystem. The RP drill is based on the TRL4 Mars Icebreaker drill and TRL5 LITA drill developed for capturing samples of ice and ice cemented ground on Mars, and represents over a decade of technology development effort. The TRL6 RP drill weighs approximately 15 kg and is rated at just over 500 Watt. The drill consists of: 1. Rotary-Percussive Drill Head, 2. Sampling Auger, 3. Brushing Station, 4. Feed Stage, and 5. Deployment Stage. To reduce sample handling complexity, the drill auger is designed to capture cuttings as opposed to cores. High sampling efficiency is possible through a dual design of the auger. The lower section has deep and low pitch flutes for retaining of cuttings. The upper section has been designed to efficiently move the cuttings out of the hole. The drill uses a "bite" sampling approach where samples are captured in 10 cm depth intervals. The first generation, TRL4 Icebreaker drill was tested in Mars chamber as well as in Antarctica and the Arctic. It demonstrated drilling at 1-1-100-100 level (1 meter in 1 hour with 100 Watt and 100 N Weight on Bit) in ice, ice cemented ground, soil, and rocks. The second generation, TRL5 LITA drill was deployed on a Carnegie Mellon University rover, called Zoe, and tested in Atacama, Antarctica, the Arctic, and Greenland. The tests demonstrated fully autonomous sample acquisition and delivery to a carousel. The modified LITA drill was tested in NASA GRC's lunar vacuum chamber at <10^-5 torr and <200 K. It demonstrated successful capture and transfer of volatile rich frozen samples to a crucible for analysis. The modified LITA drill has also been successfully vibration tested at NASA KSC. The drill was integrated with RP rover at NASA JSC and successfully tested in a lab and in the field, as well as on a large vibration table and steep slope. The latest TRL6 RP drill is currently undergoing testing at NASA GRC lunar chamber facilities.
Evaluating Math Drill and Practice Programs.
ERIC Educational Resources Information Center
Schnorr, Janice M.; Semmel, Dorothy S.
1986-01-01
General guidelines for a process evaluation of software for a specific subject and grade include: (1) Specify instructional objectives and list desired software program characteristics; (2) Access and review descriptions of programs (information sources for math programs are listed); (3) Preview software; and (4) Compare and make purchase…
DOE Office of Scientific and Technical Information (OSTI.GOV)
Chevallier, J.J.; Quetier, F.P.; Marshall, D.W.
Sedco Forex has developed an integrated computer system to enhance the technical performance of the company at various operational levels and to increase the understanding and knowledge of the drill crews. This paper describes the system and how it is used for recording and processing drilling data at the rig site, for associated technical analyses, and for well design, planning, and drilling performance studies at the operational centers. Some capabilities related to the statistical analysis of the company's operational records are also described, and future development of rig computing systems for drilling applications and management tasks is discussed.
Laser drilling of thermal barrier coated jet-engine components
NASA Astrophysics Data System (ADS)
Sezer, H. K.
Aero engine hot end components are often covered with ceramic Thermal Barrier Coatings (TBCs). Laser drilling in the TBC coated components can be a source of service life TBC degradation and spallation. The present study aims to understand the mechanisms of TBC delamination and develop techniques to drill holes without damaging the TBC, Nimonic 263 workpieces coated with TBC are used in the experiments. Microwave non-destructive testing (NDT) is employed to monitor the integrity of the coating /substrate interfaces of the post-laser drilled materials. A numerical modelling technique is used to investigate the role of melt ejection on TBC delamination. The model accounts for the vapour and the assist gas flow effects in the process. Broadly, melt ejection induced mechanical stresses for the TBC coating / bond coating and thermal effects for the bond coating / substrate interfaces are found the key delamination mechanisms. Experiments are carried out to validate the findings from the model. Various techniques that enable laser drilling without damaging the TBC are demonstrated. Twin jet assisted acute angle laser drilling is one successful technique that has been analysed using the melt ejection simulation. Optimisation of the twin jet assisted acute angle laser drilling process parameters is carried out using Design of Experiments (DoE) and statistical modelling approaches. Finally, an industrial case study to develop a high speed, high quality laser drilling system for combustor cans is described. Holes are drilled by percussion and trepan drilling in TBC coated and uncoated Haynes 230 workpieces. The production rate of percussion drilling is significantly higher than the trepan drilling, however metallurgical hole quality and reproducibility is poor. A number of process parameters are investigated to improve these characteristics. Gas type and gas pressure effects on various characteristics of the inclined laser drilled holes are investigated through theoretical and experimental work.
NETL Extreme Drilling Laboratory Studies High Pressure High Temperature Drilling Phenomena
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lyons, K.D.; Honeygan, S.; Moroz, T.H.
2008-12-01
The U.S. Department of Energy's National Energy Technology Laboratory (NETL) established the Extreme Drilling Laboratory to engineer effective and efficient drilling technologies viable at depths greater than 20,000 ft. This paper details the challenges of ultradeep drilling, documents reports of decreased drilling rates as a result of increasing fluid pressure and temperature, and describes NETL's research and development activities. NETL is invested in laboratory-scale physical simulation. Its physical simulator will have capability of circulating drilling fluids at 30,000 psi and 480°F around a single drill cutter. This simulator is not yet operational; therefore, the results will be limited to themore » identification of leading hypotheses of drilling phenomena and NETL's test plans to validate or refute such theories. Of particular interest to the Extreme Drilling Laboratory's studies are the combinatorial effects of drilling fluid pressure, drilling fluid properties, rock properties, pore pressure, and drilling parameters, such as cutter rotational speed, weight on bit, and hydraulics associated with drilling fluid introduction to the rock-cutter interface. A detailed discussion of how each variable is controlled in a laboratory setting will be part of the conference paper and presentation.« less
Oil Based Drilling Fluid Waste: An Overview on Environmentally Persistent Pollutants
NASA Astrophysics Data System (ADS)
Siddique, Shohel; Kwoffie, Lorraine; Addae-Afoakwa, Kofi; Yates, Kyari; Njuguna, James
2017-05-01
Operational discharges of spent drilling fluid, produced water, and accumulated drill cuttings from oil and gas industry are a continuous point source of environmental pollution. To meet the strict environmental standard for waste disposal, oil and gas industry is facing a numerous challenges in technological development to ensure a clean and safe environment. Oil and gas industry generates a large amount of spent drilling fluid, produced water, and drill cuttings, which are very different in every drilling operation in terms of composition and characterisation. This review article highlights the knowledge gap in identifying the different sources of waste streams in combined drilling waste. This paper also emphasises how different chemicals turn into environmentally significant pollutants after serving great performance in oil and gas drilling operations. For instance, oil based drilling fluid performs excellent in deeper drilling and drilling in the harsh geological conditions, but ended with (produces) a significant amount of persistent toxic pollutants in the environment. This review paper provides an overview on the basic concepts of drilling fluids and their functions, sources and characterisation of drilling wastes, and highlights some environmentally significant elements including different minerals present in drilling waste stream.
17 CFR 229.1205 - (Item 1205) Drilling and other exploratory and development activities.
Code of Federal Regulations, 2011 CFR
2011-04-01
... 17 Commodity and Securities Exchanges 2 2011-04-01 2011-04-01 false (Item 1205) Drilling and other... Registrants Engaged in Oil and Gas Producing Activities § 229.1205 (Item 1205) Drilling and other exploratory..., disclose: (1) The number of net productive and dry exploratory wells drilled; and (2) The number of net...
17 CFR 229.1205 - (Item 1205) Drilling and other exploratory and development activities.
Code of Federal Regulations, 2014 CFR
2014-04-01
... Registrants Engaged in Oil and Gas Producing Activities § 229.1205 (Item 1205) Drilling and other exploratory... 17 Commodity and Securities Exchanges 3 2014-04-01 2014-04-01 false (Item 1205) Drilling and other..., disclose: (1) The number of net productive and dry exploratory wells drilled; and (2) The number of net...
17 CFR 229.1205 - (Item 1205) Drilling and other exploratory and development activities.
Code of Federal Regulations, 2013 CFR
2013-04-01
... Registrants Engaged in Oil and Gas Producing Activities § 229.1205 (Item 1205) Drilling and other exploratory... 17 Commodity and Securities Exchanges 2 2013-04-01 2013-04-01 false (Item 1205) Drilling and other..., disclose: (1) The number of net productive and dry exploratory wells drilled; and (2) The number of net...
17 CFR 229.1205 - (Item 1205) Drilling and other exploratory and development activities.
Code of Federal Regulations, 2012 CFR
2012-04-01
... Registrants Engaged in Oil and Gas Producing Activities § 229.1205 (Item 1205) Drilling and other exploratory... 17 Commodity and Securities Exchanges 2 2012-04-01 2012-04-01 false (Item 1205) Drilling and other..., disclose: (1) The number of net productive and dry exploratory wells drilled; and (2) The number of net...
Features of the marketing strategy of oil and gas companies in exploration drilling
NASA Astrophysics Data System (ADS)
Sharf, I.; Malanina, V.; Kamynina, L.
2014-08-01
The implementation of national and regional programs for the development of new oil and gas provinces of Eastern Siberia poses the challenge of increasing geological exploration. The current drilling service companies' market structure, as well as the strategic task of search and exploration effectiveness requires qualitatively new approaches for choosing a contractor. The proposed strategy to select a contractor based on comprehensive analysis of certain groups of industrial, financial, infrastructural criteria allows not only to optimize the costs of exploration activities, but also to minimize preventively the risks of a poor geological exploration. The authors' SWOT- analysis of the marketing strategy of "Gazprom neft" for choosing a contractor outlined the problem of imperfection of the Russian legislation in the sphere of activities of service companies in the oil and gas sector.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Frank R. Rack; Peter Schultheiss; Melanie Holland
The primary accomplishments of the JOI Cooperative Agreement with DOE/NETL in this quarter were that: (1) follow-up logging of pressure cores containing hydrate-bearing sediment; and (2) opening of some of these cores to establish ground-truth understanding. The follow-up measurements made on pressure cores in storage are part of a hydrate geriatric study related to ODP Leg 204. These activities are described in detail in Appendices A and B of this report. Work also continued on developing plans for Phase 2 of this cooperative agreement based on evolving plans to schedule a scientific ocean drilling expedition to study marine methane hydratesmore » along the Cascadia margin, in the NE Pacific as part of the Integrated Ocean Drilling Program (IODP) using the R/V JOIDES Resolution.« less
Niu, Qiang; Chi, Xiaoyi; Leu, Ming C; Ochoa, Jorge
2008-01-01
This paper describes image processing, geometric modeling and data management techniques for the development of a virtual bone surgery system. Image segmentation is used to divide CT scan data into different segments representing various regions of the bone. A region-growing algorithm is used to extract cortical bone and trabecular bone structures systematically and efficiently. Volume modeling is then used to represent the bone geometry based on the CT scan data. Material removal simulation is achieved by continuously performing Boolean subtraction of the surgical tool model from the bone model. A quadtree-based adaptive subdivision technique is developed to handle the large set of data in order to achieve the real-time simulation and visualization required for virtual bone surgery. A Marching Cubes algorithm is used to generate polygonal faces from the volumetric data. Rendering of the generated polygons is performed with the publicly available VTK (Visualization Tool Kit) software. Implementation of the developed techniques consists of developing a virtual bone-drilling software program, which allows the user to manipulate a virtual drill to make holes with the use of a PHANToM device on a bone model derived from real CT scan data.
NASA Astrophysics Data System (ADS)
McKenzie, Judith A.; Bontognali, Tomaso R. R.; Vasconcelos, Crisogono
2014-05-01
Deep-sea drilling in the Mediterranean during DSSP Leg 13 in 1970 revealed the basin-wide occurrence of a Messinian evaporite formation. This spectacular discovery was pursued further during a subsequent drilling program, DSDP Leg 42A, in 1975, which was designed, in part, to obtain continuous cores to study the evolution of the salinity crisis itself (Hsü, Montadert, et al., 1978). Specifically, drilling at a water depth of 4,088 m in the Ionian Sea, DSDP Site 374: Messina Abyssal Plain, penetrated about 80 m into the uppermost part of the Messinian upper evaporite formation. The sedimentary sequence comprises dolomitic mudstone overlying dolomitic mudstone/gypsum cycles, which in turn overlie anhydrite and halite. The non-fossiliferous dolomitic mudstone is generally rich in organic carbon, with TOC values ranging from 0.9% to 5.3%, of possible marine origin with a good source rock potential. Commonly laminated dolomitic mudstones contain preserved filamentous cyanobacterial remains suggesting that conditions were conducive for microbial mat growth. The Ca-dolomite, composed of fine-grained anhedral crystals in the size range of 2-4 μm, is probably a primary precipitate. The unusual interstitial brines of the dolomitic mudstone units have very high alkalinities with a low pH of 5 to 6. The Mg concentration (2250 mmoles/l) is extremely elevated, whereas the Ca concentration is nearly zero. Finally, the drilled evaporite sedimentary sequence was interpreted as being deposited in an alkaline lake/sea ("Lago Mare"), which covered the area during the latest Messinian. Projecting forward 40 years since the DSDP Leg 42A drilling campaign, research into the factors controlling dolomite precipitation under Earth surface conditions has led to the development of new models involving the metabolism of microorganisms and associated biofilms to overcome the kinetic inhibitions associated with primary dolomite precipitation. Together with laboratory experiments, microbial dolomite precipitation has been studied extensively in rare modern environments, such as the arid coastal sabkhas of Abu Dhabi, UAE and the hypersaline coastal lagoons in Brazil. However, extrapolation of these studies of relatively limited aerial extent to interpret larger-scale, ancient dolomite formation of putative evaporitic origin remains elusive. Such ancient micritic dolomite formations with associated micro-porosity represent extremely valuable hydrocarbon reservoirs. Therefore, a comprehensive investigation of a relatively recent micritic dolomite deposit that has not experienced extensive burial depths and diagenesis is essential to extend our understanding of these important reservoir systems. Based on the limited data obtained during drilling at DSDP Site 374: Messina Abyssal Plain, the dolomitic mudstones of the uppermost Messinian evaporite complex represent an ideal candidate for such an extensive study in a "natural laboratory". Thus, to increase our understanding of the biogeochemical processes associated with ancient massive dolomite formation, we propose to document the scientific objectives to support a major new drilling campaign to study the sub-seafloor Messinian evaporite complex in the deep Mediterranean basins, using greatly enhanced drilling technology that is currently available within the new International Ocean Discovery Program (IODP). Hsü, K., Montadert, L. et al., 1978. Initial Reports of the Deep Sea Drilling Project, Volume 42, Part 1: Washington (U.S. Government Printing Office).
DOE Office of Scientific and Technical Information (OSTI.GOV)
Tranter, P.
Tender-assisted drilling (TAD) involves the use of tender support vessel (TSV) during the drilling phase of platform development to provide drilling utilities to the platform-mounted drilling package. The TSV provides facilities such as mud mixing, storage, pumping, bulk storage, hotel accommodations, and power. Thus, the platform topsides and jacket weight and size can be smaller and less expensive. The paper discusses the advantages and disadvantages of TAD, then describes the TAD vessel, semisubmersible, platform cost savings, accommodations, drilling and workovers, and field experience.
NASA Astrophysics Data System (ADS)
Isbilir, Ozden
Owing to their desirable strength-to-weight characteristics, carbon fibre reinforced polymer composites have been favourite materials for structural applications in different industries such as aerospace, transport, sports and energy. They provide a weight reduction in whole structure and consequently decrease fuel consumption. The use of lightweight materials such as titanium and its alloys in modern aircrafts has also increased significantly in the last couple of decades. Titanium and its alloys offer high strength/weight ratio, high compressive and tensile strength at high temperatures, low density, excellent corrosion resistance, exceptional erosion resistance, superior fatigue resistance and relatively low modulus of elasticity. Although composite/metal hybrid structures are increasingly used in airframes nowadays, number of studies regarding drilling of composite/metal stacks is very limited. During drilling of multilayer materials different problems may arise due to very different attributes of these materials. Machining conditions of drilling such structures play an important role on tool wear, quality of holes and cost of machining.. The research work in this thesis is aimed to investigate drilling of CFRP/Ti6Al4V hybrid structure and to optimize process parameters and drill geometry. The research work consist complete experimental study including drilling tests, in-situ and post measurements and related analysis; and finite element analysis including fully 3-D finite element models. The experimental investigations focused on drilling outputs such as thrust force, torque, delamination, burr formation, surface roughness and tool wear. An algorithm was developed to analyse drilling induced delamination quantitatively based on the images. In the numerical analysis, novel 3-D finite element models of drilling of CFRP, Ti6Al4V and CFRP/Ti6Al4V hybrid structure were developed with the use of 3-D complex drill geometries. A user defined subroutine was developed to model material and failure behaviour of CFRP. The effects of process parameters on drilling outputs have been investigated and compared with the experimental results. The influences of drill bit geometries have been simulated in this study..
Federal Register 2010, 2011, 2012, 2013, 2014
2010-08-18
....; Jiangsu Shuguang Huayang Drilling Tool Co., Ltd.; and Jiangyin Long-Bright Drill Pipe Manufacturing Co..., Ukraine, and Peru are countries comparable to the PRC in terms of economic development. See April 20, 2010... countries comparable to the PRC in terms of economic development. See Surrogate Country List. The sources of...
Dillon, Neal P; Fichera, Loris; Kesler, Kyle; Zuniga, M Geraldine; Mitchell, Jason E; Webster, Robert J; Labadie, Robert F
2017-09-01
This article presents the development and experimental validation of a methodology to reduce the risk of thermal injury to the facial nerve during minimally invasive cochlear implantation surgery. The first step in this methodology is a pre-operative screening process, in which medical imaging is used to identify those patients that present a significant risk of developing high temperatures at the facial nerve during the drilling phase of the procedure. Such a risk is calculated based on the density of the bone along the drilling path and the thermal conductance between the drilling path and the nerve, and provides a criterion to exclude high-risk patients from receiving the minimally invasive procedure. The second component of the methodology is a drilling strategy for manually-guided drilling near the facial nerve. The strategy utilizes interval drilling and mechanical constraints to enable better control over the procedure and the resulting generation of heat. The approach is tested in fresh cadaver temporal bones using a thermal camera to monitor temperature near the facial nerve. Results indicate that pre-operative screening may successfully exclude high-risk patients and that the proposed drilling strategy enables safe drilling for low-to-moderate risk patients.
NASA Astrophysics Data System (ADS)
Bright, Robin Michael
The ability to adequately cool internal gas-turbine engine components in next-generation commercial and military aircraft is of extreme importance to the aerospace industry as the demand for high-efficiency engines continues to push operating temperatures higher. Pulsed laser-drilling is rapidly becoming the preferred method of creating cooling holes in high temperature components due a variety of manufacturing advantages of laser-drilling over conventional hole-drilling techniques. As cooling requirements become more demanding, the impact of drilling conditions on material removal behavior and subsequent effects on hole quality becomes critical. In this work, the development of emission spectroscopy as a method to probe the laser-drilling process is presented and subsequently applied to the study of material behavior of various structural aerospace materials during drilling. Specifically, emitted photons associated with energy level transitions within excited neutral atoms in material ejected during drilling were detected and analyzed. Systematic spectroscopic studies indicated that electron energy level populations and calculated electron temperatures within ejected material are dependent on both laser pulse energy and duration. Local thermal conditions detected by the developed method were related to the characteristics of ejected material during drilling and to final hole quality. Finally, methods of utilizing the observed relationships for spectroscopic process monitoring and control were demonstrated.
Monroe, Utah, Hydrothermal System: Results from Drilling of Test Wells MC1 and MC2
DOE Office of Scientific and Technical Information (OSTI.GOV)
Chapman, D.S.; Harrison, Roger
1978-10-01
Following detailed geological (Parry et al., 1976; Miller, 1976) and geophysical (Mase, Chapman, and Ward, 1978; Kilty, Mase, and Chapman, 1978) studies of the Monroe, Utah hydrothermal system, a program of drilling two intermediate depth test wells was undertaken. The objectives of the test well drilling were three-fold: (1) to obtain structural information bearing on the poorly known dip of the Sevier Fault, (2) to obtain temperature information below the shallow depths (approximately 300 ft.) sampled in the first phase of exploration, and (3) to provide cased wells which could act as monitor wells during the production phase of themore » project. The test well drilling was seen to be vital to the selection of a site for a production well. This report describes the results from the drilling of the two test wells, designated MC1 and MC2, and offers interpretation of the hydrothermal system which may be used as a basis for selecting production wells.« less
NASA Astrophysics Data System (ADS)
Ohlendorf, Christian; Gebhardt, Catalina; Hahn, Annette; Kliem, Pierre; Zolitschka, Bernd
2011-07-01
Using the ICDP (International Continental Scientific Drilling Program) deep lake drilling expedition no. 5022 as an example, we describe core processing and sampling procedures as well as new tools developed for subsampling. A manual core splitter is presented that is (1) mobile, (2) able to cut plastic core liners lengthwise without producing swarf of liner material and (3) consists of off-the-shelf components. In order to improve the sampling of sediment cores, a new device, the core sampling assembly (CSA), was developed that meets the following targets: (1) the partitioning of the sediment into discs of equal thickness is fast and precise, (2) disturbed sediment at the inner surface of the liner is discarded during this sampling process, (3) usage of the available sediment is optimised, (4) subsamples are volumetric and oriented, and (5) identical subsamples are taken. The CSA can be applied to D-shaped split sediment cores of any diameter and consists of a divider and a D-shaped scoop. The sampling plan applied for ICDP expedition 5022 is illustrated and may be used as a guideline for planning the efficient partitioning of sediment amongst different lake research groups involved in multidisciplinary projects. For every subsample, the use of quality flags is suggested (1) to document the sample condition, (2) to give a first sediment classification and (3) to guarantee a precise adjustment of logging and scanning data with data determined on individual samples. Based on this, we propose a protocol that might be applied across lake drilling projects in order to facilitate planning and documentation of sampling campaigns and to ensure a better comparability of results.
Open Core Data: Connecting scientific drilling data to scientists and community data resources
NASA Astrophysics Data System (ADS)
Fils, D.; Noren, A. J.; Lehnert, K.; Diver, P.
2016-12-01
Open Core Data (OCD) is an innovative, efficient, and scalable infrastructure for data generated by scientific drilling and coring to improve discoverability, accessibility, citability, and preservation of data from the oceans and continents. OCD is building on existing community data resources that manage, store, publish, and preserve scientific drilling data, filling a critical void that currently prevents linkages between these and other data systems and tools to realize the full potential of data generated through drilling and coring. We are developing this functionality through Linked Open Data (LOD) and semantic patterns that enable data access through the use of community ontologies such as GeoLink (geolink.org, an EarthCube Building Block), a collection of protocols, formats and vocabularies from a set of participating geoscience repositories. Common shared concepts of classes such as cruise, dataset, person and others allow easier resolution of common references through shared resource IDs. These graphs are then made available via SPARQL as well as incorporated into web pages following schema.org approaches. Additionally the W3C PROV vocabulary is under evaluation for use for documentation of provenance. Further, the application of persistent identifiers for samples (IGSNs); datasets, expeditions, and projects (DOIs); and people (ORCIDs), combined with LOD approaches, provides methods to resolve and incorporate metadata and datasets. Application Program Interfaces (APIs) complement these semantic approaches to the OCD data holdings. APIs are exposed following the Swagger guidelines (swagger.io) and will be evolved into the OpenAPI (openapis.org) approach. Currently APIs are in development for the NSF funded Flyover Country mobile geoscience app (fc.umn.edu), the Neotoma Paleoecology Database (neotomadb.org), Magnetics Information Consortium (MagIC; earthref.org/MagIC), and other community tools and data systems, as well as for internal OCD use.
NASA Technical Reports Server (NTRS)
Bar-Cohen, Yoseph; Sherrit, Stewart; Badescu, Mircea; Bao, Xiaoqi
2012-01-01
NASA exploration missions are increasingly including sampling tasks but with the growth in engineering experience (particularly, Phoenix Scout and MSL) it is now very much recognized that planetary drilling poses many challenges. The difficulties grow significantly with the hardness of sampled material, the depth of drilling and the harshness of the environmental conditions. To address the requirements for samplers that could be operated at the conditions of the various bodies in the solar system, a number of piezoelectric actuated drills and corers were developed by the Advanced Technologies Group of JPL. The basic configuration that was conceived in 1998 is known as the Ultrasonic/Sonic Driller/Corer (USDC), and it operates as a percussive mechanism. This drill requires as low preload as 10N (important for operation at low gravity) allowing to operate with as low-mass device as 400g, use an average power as low as 2- 3W and drill rocks as hard as basalt. A key feature of this drilling mechanism is the use of a free-mass to convert the ultrasonic vibrations generated by piezoelectric stack to sonic impacts on the bit. Using the versatile capabilities f the USDC led to the development of many configurations and device sizes. Significant improvement of the penetration rate was achieved by augmenting the hammering action by rotation and use of a fluted bit to remove cuttings. To reach meters deep in ice a wireline drill was developed called the Ultrasonic/Sonic Gopher and it was demonstrated in 2005 to penetrate about 2-m deep at Antarctica. Jointly with Honeybee Robotics, this mechanism is currently being modified to incorporate rotation and inchworm operation forming Auto-Gopher to reach meters deep in rocks. To take advantage of the ability of piezoelectric actuators to operate over a wide temperatures range, piezoelectric actuated drills were developed and demonstrated to operate at as cold as -200oC and as hot as 500oC. In this paper, the developed mechanisms will be reviewed and discussed including the configurations, capabilities, and challenges.
A new drilling method—Earthworm-like vibration drilling
Wang, Peng; Wang, Ruihe
2018-01-01
The load transfer difficulty caused by borehole wall friction severely limits the penetration rate and extended-reach limit of complex structural wells. A new friction reduction technology termed “earthworm-like drilling” is proposed in this paper to improve the load transfer of complex structural wells. A mathematical model based on a “soft-string” model is developed and solved. The results show that earthworm-like drilling is more effective than single-point vibration drilling. The amplitude and frequency of the pulse pressure and the installation position of the shakers have a substantial impact on friction reduction and load transfer. An optimization model based on the projection gradient method is developed and used to optimize the position of three shakers in a horizontal well. The results verify the feasibility and advantages of earthworm-like drilling, and establish a solid theoretical foundation for its application in oil field drilling. PMID:29641615
The Marskhod Egyptian Drill Project
NASA Astrophysics Data System (ADS)
Shaltout, M. A. M.
We describe a possible participation of Egypt in a future Mars rover Mission. It was suggested that Egypt participate through involvement in the design, building and testing of a drill to obtain sub-surface samples. The Space Research Institute of the Russian Academy of Sciences (IKI), formally invited the Egyptian Ministry of Scientific Research to study the concept for potential use on the Russian Mars 2001 Mission. As one of the objectives of the Marskhod mission was the analysis of sub-surface samples, a drilling mechanism in the payload would be essential. The Egyptian expertise in drill development is associated with the archaeological exploration of the Pyramids. A sophisticated drilling system perforated limestone to a depth of 2 m without the use of lubricants or cooling fluids that might have contaminated the Pit's environment. This experience could have been applied to a drill development Mars 2001 mission, which was unfortunately canceled due to economic problems.
30 CFR 816.14 - Casing and sealing of drilled holes: Temporary.
Code of Federal Regulations, 2010 CFR
2010-07-01
..., DEPARTMENT OF THE INTERIOR PERMANENT PROGRAM PERFORMANCE STANDARDS PERMANENT PROGRAM PERFORMANCE STANDARDS... approved permit application for use to return coal processing waste or water to underground workings, or to...
30 CFR 816.15 - Casing and sealing of drilled holes: Permanent.
Code of Federal Regulations, 2010 CFR
2010-07-01
..., DEPARTMENT OF THE INTERIOR PERMANENT PROGRAM PERFORMANCE STANDARDS PERMANENT PROGRAM PERFORMANCE STANDARDS... to the mine workings by people, livestock, fish and wildlife, and machinery, and to keep acid or...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Barker, Ben; Moore, Joe; Segall, Marylin
The Tularosa-Hueco basin in south-central New Mexico has long been known as an extensional area of high heat flow. Much of the basin is within the Fort Bliss military reservation, which is an exceptionally high value customer for power independent of the regional electric grid and for direct use energy in building climate control. A series of slim holes drilled in the 1990s established the existence of a thermal anomaly but not its practical value. This study began in 2009 with a demonstration of new exploration drilling technology. The subsequent phases reported here delivered a useful well, comparative exploration datamore » sets and encouragement for further development. A production-size well, RMI56-5, was sited after extensive study of archival and newly collected data in 2010-2011. Most of 2012 was taken up with getting state and Federal authorities to agree on a lead agency for permitting purposes, getting a drilling permit and redesigning the drilling program to suit available equipment. In 2013 we drilled, logged and tested a 924 m well on the McGregor Range at Fort Bliss using a reverse circulation rig. Rig tests demonstrated commercial permeability and the well has a 7-inch slotted liner for use either in production or injection. An August 2013 survey of the completed well showed a temperature of 90 C with no reversal, the highest such temperature in the vicinity. The well’s proximity to demand suggests a potentially valuable resource for direct use heat and emergency power generation. The drilling produced cuttings of excellent size and quality. These were subjected to traditional analyses (thin sections, XRD) and to the QEMScan™ for comparison. QEMScan™ technology includes algorithms for determining such properties of rocks as density, mineralogy, heavy/light atoms, and porosity to be compared with direct measurements of the cuttings. In addition to a complete cuttings set, conventional and resistivity image logs were obtained in the open hole before the well was cased.« less
Jones, Jaime R; Neff, Linda J; Ely, Elizabeth K; Parker, Andrew M
2012-12-01
The Cities Readiness Initiative is a federally funded program designed to assist 72 metropolitan statistical areas (MSAs) in preparing to dispense life-saving medical countermeasures within 48 hours of a public health emergency. Beginning in 2008, the 72 MSAs were required to conduct 3 drills related to the distribution and dispensing of emergency medical countermeasures. The report describes the results of the first year of pilot data for medical countermeasure drills conducted by the MSAs. The MSAs were provided templates with key metrics for 5 functional elements critical for a successful dispensing campaign: personnel call down, site activation, facility setup, pick-list generation, and dispensing throughput. Drill submissions were compiled into single data sets for each of the 5 drills. Analyses were conducted to determine whether the measures were comparable across business and non-business hours. Descriptive statistics were computed for each of the key metrics identified in the 5 drills. Most drills were conducted on Mondays and Wednesdays during business hours (8:00 am-5:00 pm). The median completion time for the personnel call-down drill was 1 hour during business hours (n = 287) and 55 minutes during non-business hours (n = 136). Site-activation drills were completed in a median of 30 minutes during business hours and 5 minutes during non-business hours. Facility setup drills were completed more rapidly during business hours (75 minutes) compared with non-business hours (96 minutes). During business hours, pick lists were generated in a median of 3 minutes compared with 5 minutes during non-business hours. Aggregate results from the dispensing throughput drills demonstrated that the median observed throughput during business hours (60 people/h) was higher than that during non-business hours (43 people/h). The results of the analyses from this pilot sample of drill submissions provide a baseline for the determination of a national standard in operational capabilities for local jurisdictions to achieve in their planning efforts for a mass dispensing campaign during an emergency.
Rock Drilling Performance Evaluation by an Energy Dissipation Based Rock Brittleness Index
NASA Astrophysics Data System (ADS)
Munoz, H.; Taheri, A.; Chanda, E. K.
2016-08-01
To reliably estimate drilling performance both tool-rock interaction laws along with a proper rock brittleness index are required to be implemented. In this study, the performance of a single polycrystalline diamond compact (PDC) cutter cutting and different drilling methods including PDC rotary drilling, roller-cone rotary drilling and percussive drilling were investigated. To investigate drilling performance by rock strength properties, laboratory PDC cutting tests were performed on different rocks to obtain cutting parameters. In addition, results of laboratory and field drilling on different rocks found elsewhere in literature were used. Laboratory and field cutting and drilling test results were coupled with values of a new rock brittleness index proposed herein and developed based on energy dissipation withdrawn from the complete stress-strain curve in uniaxial compression. To quantify cutting and drilling performance, the intrinsic specific energy in rotary-cutting action, i.e. the energy consumed in pure cutting action, and drilling penetration rate values in percussive action were used. The results show that the new energy-based brittleness index successfully describes the performance of different cutting and drilling methods and therefore is relevant to assess drilling performance for engineering applications.
Cybersonics: Tapping into Technology
NASA Technical Reports Server (NTRS)
2001-01-01
With the assistance of Small Business Innovation Research (SBIR) funding from NASA's Jet Propulsion Laboratory, Cybersonics, Inc., developed an ultrasonic drill with applications ranging from the medical industry to space exploration. The drill, which has the ability to take a core sample of the hardest granite or perform the most delicate diagnostic medical procedure, is a lightweight, ultrasonic device made to fit in the palm of the hand. Piezoelectric actuators, which have only two moving parts and no gears or motors, drive the components of the device, enabling it to operate in a wide range of temperatures. The most remarkable aspect of the drill is its ability to penetrate even the hardest rock with minimal force application. The ultrasonic device requires 20 to 30 times less force than standard rotating drills, allowing it to be safely guided by hand during operation. Also, the drill is operable at a level as low as three watts of power, where conventional drills require more than three times this level. Potential future applications for the ultrasonic drill include rock and soil sampling, medical procedures that involve core sampling or probing, landmine detection, building and construction, and space exploration. Cybersonics, Inc. developed an ultrasonic drill with applications ranging from the medical industry to space exploration.
Lunar drill and test apparatus
NASA Technical Reports Server (NTRS)
Norrington, David W.; Ardoin, Didier C.; Alexander, Stephen G.; Rowland, Philip N.; Vastakis, Frank N.; Linsey, Steven L.
1988-01-01
The design of an experimental lunar drill and a facility to test the drill under simulated lunar conditions is described. The drill utilizes a polycrystalline diamond compact drag bit and an auger to mechanically remove cuttings from the hole. The drill will be tested in a vacuum chamber and powered through a vacuum seal by a drive mechanism located above the chamber. A general description of the design is provided followed by a detailed description and analysis of each component. Recommendations for the further development of the design are included.
Development of a Drilling Simulator for Dental Implant Surgery.
Kinoshita, Hideaki; Nagahata, Masahiro; Takano, Naoki; Takemoto, Shinji; Matsunaga, Satoru; Abe, Shinichi; Yoshinari, Masao; Kawada, Eiji
2016-01-01
The aim of this study was to develop and evaluate a dental implant surgery simulator that allows learners to experience the drilling forces necessary to perform an osteotomy in the posterior mandibular bone. The simulator contains a force-sensing device that receives input and counteracts this force, which is felt as resistance by the user. The device consists of an actuator, a load cell, and a control unit. A mandibular bone model was fabricated in which the predicted forces necessary to drill the cortical and trabecular bone were determined via micro CT image-based 3D finite element analysis. The simulator was evaluated by five dentists from the Department of Implantology at Tokyo Dental College. The ability of the evaluators to distinguish the drilling resistance through different regions of the mandibular bone was investigated. Of the five dentists, four sensed the change in resistance when the drill perforated the upper cortical bone. All five dentists were able to detect when the drill made contact with lingual cortical bone and when the lingual bone was perforated. This project successfully developed a dental implant surgery simulator that allows users to experience the forces necessary to drill through types of bone encountered during osteotomy. Furthermore, the researchers were able to build a device by which excessive drilling simulates a situation in which the lingual cortical bone is perforated--a situation that could lead to negative repercussions in a clinical setting. The simulator was found to be useful to train users to recognize the differences in resistance when drilling through the mandibular bone.
1983-12-01
clarifiers, activated sludge units, trickling filters, aerobic and anaerobic digesters, and various dowatering devices and recommendations for...for locations of water- bearing fractures. Additional responsibilities included drilling with mud and air rotary drilling rigs as well as bucket auger...interpretation. Also conducted earth resistivity surveys in Georgia and Alabama Piedmont Provinces for locations of water- bearing fractures. Additional
NASA Astrophysics Data System (ADS)
Zeigler, K. E.; Petronis, M. S.; Smith, J. J.; Ludvigson, G. A.; Doveton, J.
2012-12-01
A better understanding of the Ogallala Formation is critical in terms of refining groundwater flow models and management policies for communities relying on aquifers in heterolithic sequences around the globe. The High Plains aquifer remains under increasing stress with the growth of both urban and agricultural areas and therefore, developing the best groundwater management policies will depend on the most accurate characterization of the aquifer, the aquifer materials and their stratigraphic and geochronologic framework. Although mammalian faunal assemblages and volcanic ash bed tephrochronology provide a basic geochronologic framework for the Ogallala Formation, better precision in terms of correlation is needed in order to understand formative processes and depositional histories for the primary water-bearing units in the High Plains aquifer and confining strata. The High Plains-Ogallala Drilling Program (HPODP) was developed to advance understanding of sedimentary facies, stratigraphic framework, and chronostratigraphy of the Ogallala Formation and overlying units that comprise the central High Plains aquifer. The drilling program began in the early summer of 2011 in Haskell Co., western Kansas. By early fall 2011; the drill crew was at 92 m with about 32 m to go until they expect to hit bedrock. The final 32 meters of core was extracted during the summer 2012. Here we report the preliminary magnetostratigraphic and rock magnetic data from the first section of core. We scanned the entire 92 meters of core using an ASC Core Analysis System with a Bartington Instruments MS2C magnetic susceptibility coil allowing for bulk susceptibility measurements to be obtained along the length of the core. In addition, we collected 40 sub samples for paleomagnetic and rock magnetic. Bulk susceptibility data reveal depth dependent changes in rock magnetic properties that we interpret to reflect either climatic driven variations impacting the depositional system or a change in provenance of the sediments. Bulk susceptibility of the sediments decreases by an order of magnitude from the surface to the base of the measured core suggesting a change in detrital magnetic influx. Curie point estimates indicate that the dominant magnetic mineral in all samples is cubic, titanomagnetite phase of variable composition; whether a systemic change with depth exist is as of yet to be revealed. Preliminary paleomagnetic data are encouraging with many sub samples yielding a single component magnetization that decays near univectorally to the origin during both alternating field and thermal demagnetization.
NASA Astrophysics Data System (ADS)
Paine, Michael D.; DeBlois, Elisabeth M.; Kilgour, Bruce W.; Tracy, Ellen; Pocklington, Patricia; Crowley, Roger D.; Williams, Urban P.; Gregory Janes, G.
2014-12-01
This paper describes effects of drilling with water and synthetic-based drilling muds on benthic macro-invertebrates over 10 years at the Terra Nova offshore oil development. As such, the paper provides insight on the effects of relatively new synthetic-based drilling muds (SBMs), and makes an important contribution to our understanding of the long-term chronic effects of drilling on benthic communities. The Terra Nova Field is located approximately 350 km offshore on the Grand Banks of Newfoundland (Canada). Sediment and invertebrate samples were collected in 1997 (baseline) prior to drilling, and subsequently in 2000, 2001, 2002, 2004, 2006, 2008 and 2010. Approximately 50 stations were sampled in each year at distances of less than 1 to approximately 20 km from drill centres. Summary benthic invertebrate community measures examined were total abundance, biomass, richness, diversity and multivariate measures of community composition based on non-Metric Dimensional Scaling (nMDS). Decreases in abundance, biomass and richness were noted at one station located nearest (0.14 km) to a drill centre in some environmental effects monitoring (EEM) years. These decreases coincided with higher levels of tracers of drill muds in sediments (barium and >C10-C21 hydrocarbons). Abundances of selected individual taxa were also examined to help interpret responses when project-related effects on summary measures occurred. Enrichment effects on some tolerant taxa (e.g., the polychaete family Phyllodocidae and the bivalve family Tellinidae) and decreased abundances of sensitive taxa (e.g., the polychaete families Orbiniidae and Paraonidae) were detected to within approximately 1-2 km from discharge source. Lagged responses three to five years after drilling started were noted for Phyllodocidae and Tellinidae, suggesting chronic or indirect effects. Overall, results of benthic community analyses at Terra Nova indicate that effects on summary measures of community composition were spatially limited but, as seen elsewhere, some taxa were more sensitive to drilling discharges.
Ice Sheet History from Antarctic Continental Margin Sediments: The ANTOSTRAT Approach
Barker, P.F.; Barrett, P.J.; Camerlenghi, A.; Cooper, A. K.; Davey, F.J.; Domack, E.W.; Escutia, C.; Kristoffersen, Y.; O'Brien, P.E.
1998-01-01
The Antarctic Ice Sheet is today an important part of the global climate engine, and probably has been so for most of its long existence. However, the details of its history are poorly known, despite the measurement and use, over two decades, of low-latitude proxies of ice sheet volume. An additional way of determining ice sheet history is now available, based on understanding terrigenous sediment transport and deposition under a glacial regime. It requires direct sampling of the prograded wedge of glacial sediments deposited at the Antarctic continental margin (and of derived sediments on the continental rise) at a small number of key sites, and combines the resulting data using numerical models of ice sheet development. The new phase of sampling is embodied mainly in a suite of proposals to the Ocean Drilling Program, generated by separate regional proponent groups co-ordinated through ANTOSTRAT (the Antarctic Offshore Acoustic Stratigraphy initiative). The first set of margin sites has now been drilled as ODP Leg 178 to the Antarctic Peninsula margin, and a first, short season of inshore drilling at Cape Roberts, Ross Sea, has been completed. Leg 178 and Cape Roberts drilling results are described briefly here, together with an outline of key elements of the overall strategy for determining glacial history, and of the potential contributions of drilling other Antarctic margins investigated by ANTOSTRAT. ODP Leg 178 also recovered continuous ultra-high-resolution Holocene biogenic sections at two sites within a protected, glacially-overdeepened basin (Palmer Deep) on the inner continental shelf of the Antarctic Peninsula. These and similar sites from around the Antarctic margin are a valuable resource when linked with ice cores and equivalent sections at lower latitude sites for studies of decadal and millenial-scale climate variation.
Sample Acquisition and Caching architecture for the Mars Sample Return mission
NASA Astrophysics Data System (ADS)
Zacny, K.; Chu, P.; Cohen, J.; Paulsen, G.; Craft, J.; Szwarc, T.
This paper presents a Mars Sample Return (MSR) Sample Acquisition and Caching (SAC) study developed for the three rover platforms: MER, MER+, and MSL. The study took into account 26 SAC requirements provided by the NASA Mars Exploration Program Office. For this SAC architecture, the reduction of mission risk was chosen by us as having greater priority than mass or volume. For this reason, we selected a “ One Bit per Core” approach. The enabling technology for this architecture is Honeybee Robotics' “ eccentric tubes” core breakoff approach. The breakoff approach allows the drill bits to be relatively small in diameter and in turn lightweight. Hence, the bits could be returned to Earth with the cores inside them with only a modest increase to the total returned mass, but a significant decrease in complexity. Having dedicated bits allows a reduction in the number of core transfer steps and actuators. It also alleviates the bit life problem, eliminates cross contamination, and aids in hermetic sealing. An added advantage is faster drilling time, lower power, lower energy, and lower Weight on Bit (which reduces Arm preload requirements). Drill bits are based on the BigTooth bit concept, which allows re-use of the same bit multiple times, if necessary. The proposed SAC consists of a 1) Rotary-Percussive Core Drill, 2) Bit Storage Carousel, 3) Cache, 4) Robotic Arm, and 5) Rock Abrasion and Brushing Bit (RABBit), which is deployed using the Drill. The system also includes PreView bits (for viewing of cores prior to caching) and Powder bits for acquisition of regolith or cuttings. The SAC total system mass is less than 22 kg for MER and MER+ size rovers and less than 32 kg for the MSL-size rover.
A Novel Well Drill Assisted with High-Frequency Vibration Using the Bending Mode
Qi, Xinda; Chen, Weishan; Tang, Xintian; Shi, Shengjun
2018-01-01
It is important for companies to increase the efficiency of drilling as well as prolong the lifetime of the drilling tool. Since some previous investigations indicated that a superposition of well drilling with an additional vibration increases the drilling efficiency, this paper introduces a novel well drill which is assisted with additional vibrations by means of piezoelectric sandwich bending vibration transducer. The proposed drill uses bending vibrations in two different directions to from an elliptical trajectory movement, which can help the drill to break the surface of hard material more efficiently and clean away the lithic fragments more easily. The proposed well drill with bending vibration transducer is designed to have a resonance frequency of the first bending vibration mode of about 1779 Hz. The motion equation of the particle on the edge of the drill bit is developed and analyzed. The vibration trajectory of the particle on the edge of the drill bit is calculated by using finite element method. A prototype of the proposed drill using bending vibrations is fabricated and tested to verify the aim of drilling efficiency increase. The feed speed of the vibration assisted drilling is tested to be about 0.296 mm/s when the excitation voltage of the transducer is 300 V, while this speed decreases to about 0.195 mm/s when no vibration is added. This comparison shows that the feed speed of the vibration assisted drilling is about 52% higher than that of the normal drilling, which means the proposed drill has a better efficiency and it is important to consider vibration superimposition in well drilling. In addition, the surface of the drill hole gained by the vibration assisted drilling is smoother than that of the normal drilling, which makes the clearance easier. PMID:29641481
Small-scale mechanical characterization of viscoelastic adhesive systems
NASA Astrophysics Data System (ADS)
Shean, T. A. V.
Aero engine hot end components are often covered with ceramic Thermal Barrier Coatings (TBCs). Laser drilling in the TBC coated components can be a source of service life TBC degradation and spallation. The present study aims to understand the mechanisms of TBC delamination and develop techniques to drill holes without damaging the TBC, Nimonic 263 workpieces coated with TBC are used in the experiments. Microwave non-destructive testing (NDT) is employed to monitor the integrity of the coating /substrate interfaces of the post-laser drilled materials. A numerical modelling technique is used to investigate the role of melt ejection on TBC delamination. The model accounts for the vapour and the assist gas flow effects in the process. Broadly, melt ejection induced mechanical stresses for the TBC coating / bond coating and thermal effects for the bond coating / substrate interfaces are found the key delamination mechanisms. Experiments are carried out to validate the findings from the model. Various techniques that enable laser drilling without damaging the TBC are demonstrated. Twin jet assisted acute angle laser drilling is one successful technique that has been analysed using the melt ejection simulation. Optimisation of the twin jet assisted acute angle laser drilling process parameters is carried out using Design of Experiments (DoE) and statistical modelling approaches. Finally, an industrial case study to develop a high speed, high quality laser drilling system for combustor cans is described. Holes are drilled by percussion and trepan drilling in TBC coated and uncoated Haynes 230 workpieces. The production rate of percussion drilling is significantly higher than the trepan drilling, however metallurgical hole quality and reproducibility is poor. A number of process parameters are investigated to improve these characteristics. Gas type and gas pressure effects on various characteristics of the inclined laser drilled holes are investigated through theoretical and experimental work.
Structure and composition of the plate-boundary slip zone for the 2011 Tohoku-Oki earthquake.
Chester, Frederick M; Rowe, Christie; Ujiie, Kohtaro; Kirkpatrick, James; Regalla, Christine; Remitti, Francesca; Moore, J Casey; Toy, Virginia; Wolfson-Schwehr, Monica; Bose, Santanu; Kameda, Jun; Mori, James J; Brodsky, Emily E; Eguchi, Nobuhisa; Toczko, Sean
2013-12-06
The mechanics of great subduction earthquakes are influenced by the frictional properties, structure, and composition of the plate-boundary fault. We present observations of the structure and composition of the shallow source fault of the 2011 Tohoku-Oki earthquake and tsunami from boreholes drilled by the Integrated Ocean Drilling Program Expedition 343 and 343T. Logging-while-drilling and core-sample observations show a single major plate-boundary fault accommodated the large slip of the Tohoku-Oki earthquake rupture, as well as nearly all the cumulative interplate motion at the drill site. The localization of deformation onto a limited thickness (less than 5 meters) of pelagic clay is the defining characteristic of the shallow earthquake fault, suggesting that the pelagic clay may be a regionally important control on tsunamigenic earthquakes.
Probing reservoir-triggered earthquakes in Koyna, India, through scientific deep drilling
Gupta, H.; Nayak, Shailesh; Ellsworth, William L.; Rao, Y. J. B.; Rajan, S.; Bansal, B.K.; Purnachandra Rao, N.; Roy, S.; Arora, K.; Mohan, R.; Tiwari, V. M.; Satyanarayana, H. V. S.; Patro, P. K.; Shashidhar, D.; Mallika, K.
2014-01-01
We report here the salient features of the recently concluded International Continental Scientific Drilling Program (ICDP) workshop in Koyna, India. This workshop was a sequel to the earlier held ICDP workshop in Hyderabad and Koyna in 2011. A total of 49 experts (37 from India and 12 from 8 other countries) spent 3 days reviewing the work carried out during the last 3 years based on the recommendations of the 2011 workshop and suggesting the future course of action, including detailed planning for a full deep drilling proposal in Koyna, India. It was unanimously concluded that Koyna is one of the best sites anywhere in the world to investigate genesis of triggered earthquakes from near-field observations. A broad framework of the activities for the next phase leading to deep drilling has been worked out.
NASA Astrophysics Data System (ADS)
Glass, B. J.; Cannon, H.; Bonaccorsi, R.; Zacny, K.
2006-12-01
The Drilling Automation for Mars Exploration (DAME) project's purpose is to develop and field-test drilling automation and robotics technologies for projected use in missions in the 2011-15 period. DAME includes control of the drilling hardware, and state estimation of both the hardware and the lithography being drilled and the state of the hole. A sister drill was constructed for the Mars Analog Río Tinto Experiment (MARTE) project and demonstrated automated core handling and string changeout in 2005 drilling tests at Rio Tinto, Spain. DAME focused instead on the problem of drill control while actively drilling while not getting stuck. Together, the DAME and MARTE projects demonstrate a fully automated robotic drilling capability, including hands-off drilling, adjustment to different strata and downhole conditions, recovery from drilling faults (binding, choking, etc.), drill string changeouts, core acquisition and removal, and sample handling and conveyance to in-situ instruments. The 2006 top-level goal of DAME drilling in-situ tests was to verify and demonstrate a capability for hands-off automated drilling, at an Arctic Mars-analog site. There were three sets of 2006 test goals, all of which were exceeded during the July 2006 field season. The first was to demonstrate the recognition, while drilling, of at least three of the six known major fault modes for the DAME planetary-prototype drill, and to employ the correct recovery or safing procedure in response. The second set of 2006 goals was to operate for three or more hours autonomously, hands-off. And the third 2006 goal was to exceed 3m depth into the frozen breccia and permafrost with the DAME drill (it had not gone further than 2.2m previously). Five of six faults were detected and corrected, there were 43 hours of hands-off drilling (including a 4 hour sequence with no human presence nearby), and 3.2m was the total depth. And ground truth drilling used small commercial drilling equipment in parallel in order to obtain cores and ice profiles at the drilling site. In the course of DAME drilling automation testing, the drilling-induced temperature gradients and their effects on encountered subsurface permafrost and ice layers were observed while drilling in frozen impact breccia at Haughton Crater. In repeated tests of robotic core removal processing and handling in the MARTE project, including field tests, cross-contamination issues arose between successive cores and samples, and procedures and metrics were developed for minimizing the cross-contamination. The MARTE core processing cross-contamination aspects were tested by analyzing a set of pristine samples (those stratigraphically known) vs. cuttings (loose clays) or artifacts from the robotic drilling (indurated clay layers). MARTE ground truth drilling, in parallel with the automated tests, provided control information on the discontinuity/continuity of the stratigraphic record (i.e., texture, color and structure of loose and consolidated materials).
NETL Extreme Drilling Laboratory Studies High Pressure High Temperature Drilling Phenomena
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lyons, K.D.; Honeygan, S.; Moroz, T
2007-06-01
The U.S. Department of Energy’s National Energy Technology Laboratory (NETL) established an Extreme Drilling Lab to engineer effective and efficient drilling technologies viable at depths greater than 20,000 feet. This paper details the challenges of ultra-deep drilling, documents reports of decreased drilling rates as a result of increasing fluid pressure and temperature, and describes NETL’s Research and Development activities. NETL is invested in laboratory-scale physical simulation. Their physical simulator will have capability of circulating drilling fluids at 30,000 psi and 480 °F around a single drill cutter. This simulator will not yet be operational by the planned conference dates; therefore,more » the results will be limited to identification of leading hypotheses of drilling phenomena and NETL’s test plans to validate or refute such theories. Of particular interest to the Extreme Drilling Lab’s studies are the combinatorial effects of drilling fluid pressure, drilling fluid properties, rock properties, pore pressure, and drilling parameters, such as cutter rotational speed, weight on bit, and hydraulics associated with drilling fluid introduction to the rock-cutter interface. A detailed discussion of how each variable is controlled in a laboratory setting will be part of the conference paper and presentation.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Newcomer, Darrell R.
2007-09-30
Slug-test results obtained from single and multiple, stress-level slug tests conducted during drilling and borehole advancement provide detailed hydraulic conductivity information at two Hanford Site Operable Unit (OU) ZP-1 test well locations. The individual test/depth intervals were generally sited to provide hydraulic-property information within the upper ~10 m of the unconfined aquifer (i.e., Ringold Formation, Unit 5). These characterization results complement previous and ongoing drill-and-test characterization programs at surrounding 200-West and -East Area locations (see Figure S.1).
Geohydrologic and drill-hole data for test well USW H-3, Yucca Mountain, Nye County, Nevada
DOE Office of Scientific and Technical Information (OSTI.GOV)
Thordarson, W.; Rush, F.E.; Spengler, R.W.
This report presents data collected to determine the hydraulic characteristics of rocks penetrated in test well USW H-3. The well is one of a series of test wells drilled in and near the southwestern part of the Nevada Test Site, Nye County, Nevada, in a program conducted in cooperation with the US Department of Energy. These investigations are part of the Nevada Nuclear Waste Storage Investigations to identify suitable sites for storage of high-level radioactive wastes. Data on drilling operations, lithology, borehole geophysics, hydrologic monitoring, pumping, swabbing, and injection tests for the well are contained in this report.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Jill S. Buckley; Norman R. Morrow
2006-01-01
The objectives of this project are: (1) to improve understanding of the wettability alteration of mixed-wet rocks that results from contact with the components of synthetic oil-based drilling and completion fluids formulated to meet the needs of arctic drilling; (2) to investigate cleaning methods to reverse the wettability alteration of mixed-wet cores caused by contact with these SBM components; and (3) to develop new approaches to restoration of wetting that will permit the use of cores drilled with SBM formulations for valid studies of reservoir properties.
Scientific Ocean Drilling to Assess Submarine Geohazards along European Margins
NASA Astrophysics Data System (ADS)
Ask, M. V.; Camerlenghi, A.; Kopf, A.; Morgan, J. K.; Ocean DrillingSeismic Hazard, P. E.
2008-12-01
Submarine geohazards are some of the most devastating natural events in terms of lives lost and economic impact. Earthquakes pose a big threat to society and infrastructure, but the understanding of their episodic generation is incomplete. Tsunamis are known for their potential of striking coastlines world-wide. Other geohazards originating below the sea surface are equally dangerous for undersea structures and the coastal population: submarine landslides and volcanic islands collapse with little warning and devastating consequences. The European scientific community has a strong focus on geohazards along European and nearby continental margins, especially given their high population densities, and long historic and prehistoric record of hazardous events. For example, the Mediterranean is surrounded by very densely-populated coastline and is the World's leading holiday destination, receiving up 30% of global tourism. In addition, its seafloor is criss-crossed by hydrocarbon pipelines and telecommunication cables. However, the governing processes and recurrence intervals of geohazards are still poorly understood. Examples include, but are not limited to, earthquakes and volcanic eruptions along the active tectonic margins of the Mediterranean and Sea of Marmara, landslides on both active and passive margins, and tsunamites and seismites in the sedimentary record that suggest a long history of similar events. The development of geophysical networks, drilling, sampling and long-term monitoring are crucial to the understanding of earthquake, landslide, and tsunami processes, and to mitigate the associated risks in densely populated and industrialized regions such as Europe. Scientific drilling, particularly in the submarine setting, offers a unique tool to obtain drill core samples, borehole measurements and long-term observations. Hence, it is a critical technology to investigate past, present, and possible future influences of hazardous processes in this area. The Integrated Ocean Drilling Program (IODP) provides technologically top-level drilling vessels and platforms that can be used by scientists to address global scientific problems, including the causes and processes responsible for submarine geohazards. Both IODP and ECORD (the European Consortium for Ocean Research Drilling in collaboration with the European Science Foundation) support scientific initiatives towards submarine geohazards, because the geological record of geohazards can be read and interpreted only through ocean drilling, combined with a broad array of geophysical, geotechnical, and laboratory studies, to identify structures and deposits associated with hazardous phenomena.
NASA Astrophysics Data System (ADS)
Sun, Youhong; Gao, Ke; Yu, Ping; Liu, Baochang; Guo, Wei; Ma, Yinlong; Yang, Yang
2014-05-01
SK-2 Well is located in DaQing city,where is site of the largest oil field in China,Heilongjiang province, north-east of China.The objective of SK-2 well is to obtain full cores of cretaceous formation in Song Liao basin,and to build the time tunnel of Cretaceous greenhouse climate change,and to clarify the causes,processes and results of the formations of DaQing oil field. This will ensure to achieve our ultimate goals,to test the CRUST-1 drilling rig and improve China's deep scientific drilling technology,to form the scientific drilling technology,method and system with independent intellectual property rights,and to provide technical knowledge and information for China's ten kilometers super-deep scientific drilling technical resources.SK-2 Well is at 6400 meter depth, where the drilling inclination is 90 degree and the continuous coring length is 3535 meter that from 2865 to 6400 meter,the recovery rate of the core is greater or equal to 95 percent with 100 millimeters core diameter and 3.9 degree per 100 meter geothermal gradient.The CRUST-1 rig is designated with special drilling equipment for continental scientific drilling combined to the oil drilling equipment ability with advanced geological drilling technology which is highly automatic and intelligent. CRUST-1 drilling ability is 10000 meter with the maximum hook load 700 tons, the total power is 4610 Kilowatt.CRUST-1 will be integrated with a complete set of automation equipment,including big torque hydraulic top drive,high accuracy automatic drilling rod feeding system, suspended automatic drill string discharge device,hydraulic intelligent iron roughneck,and hydraulic automatic catwalk to fully meet the drilling process requirements of SK-2.Designed with advanced drilling technique for 260 degree in the bottom of SK-2 well and hard rock,including the drilling tools of high temperature hydraulic hammer,high temperature resistance and high strength aluminum drill pipe,high temperature preparation of mud treatment and high temperature resistant cementing materials, and bionic bits,that is coupling bionic PDC tooth bit and diamond-impregnated bit for hard rock.All parts of CRUST-1 were successfully assembled along with the derrick and base lift and transported about 3456 kilometers from manufacture,GuangHan city in southwest China's Sichuan province,to the well site of SK-2 in end of 2013.SK-2 will be finished during next 4 years.
Development of an Ultra-Light Multipurpose Drill and Tooling for the Transportable Array in Alaska
NASA Astrophysics Data System (ADS)
Coyle, B. J.; Lundgren, M.; Busby, R. W.
2014-12-01
Over the next four years the EarthScope Transportable Array (TA) will install approximately 250 to 275 broadband seismic stations in Alaska and Western Canada. The station plans build on recent developments in posthole broadband seismometer design and call for sensors to be installed in boreholes 7 inches diameter, from 1 to 5 meters deep. These boreholes will be lined with PVC or steel casing, grouted in place. The proposed station locations are in a grid-like pattern with a nominal spacing of 85 km. Since most of these locations will only be accessible by helicopter, it was necessary to develop an ultra-light drilling system that could be transported to site in one sling load by a high performance light helicopter (i.e. AS350B2 or Bell 407) and still be able to drill the variety of ground conditions we expect to encounter. In the past year we have developed a working prototype, gasoline-hydraulic drill rig that can be configured to run auger, diamond core or DTH tools, and weighs <1,300 lbs, including tooling. We have successfully drilled over 30 boreholes with this drill, including 12 for TA installations in Alaska and 13 at the Piñon Flat Observatory for testing sensor performance and placement techniques. Our drilling solution comprises: - Hydraulic system using a variable flow pump with on-demand load sensing valves to reduce the engine size needed and to cut down on heat build-up; - Rotation head mounting system on the travelling block to enable quick change of drilling tools; - Low speed, high torque rotation head for the auger, and an anchoring system that enables us to apply up to 5,000 lbs downforce for augering in permafrost; - Custom DTH that can run on low air pressure and air flow, yet is still robust enough to drill a 7 inch hole 2.5 meters through solid rock; - One-trip casing advance drilling with the DTH, steel casing is loaded at the start of drilling and follows the drill bit down; - Grout-through bottom caps for sealing the borehole casing and cementing it in place. Our next step is to build a dedicated DTH drilling system that will be light enough to mobilize to sites in one helicopter sling, including an air compressor. This rig is currently on the drawing board and we expect to build it this winter for field testing in the spring.
Drilling Automation Demonstrations in Subsurface Exploration for Astrobiology
NASA Technical Reports Server (NTRS)
Glass, Brian; Cannon, H.; Lee, P.; Hanagud, S.; Davis, K.
2006-01-01
This project proposes to study subsurface permafrost microbial habitats at a relevant Arctic Mars-analog site (Haughton Crater, Devon Island, Canada) while developing and maturing the subsurface drilling and drilling automation technologies that will be required by post-2010 missions. It builds on earlier drilling technology projects to add permafrost and ice-drilling capabilities to 5m with a lightweight drill that will be automatically monitored and controlled in-situ. Frozen cores obtained with this drill under sterilized protocols will be used in testing three hypotheses pertaining to near-surface physical geology and ground H2O ice distribution, viewed as a habitat for microbial life in subsurface ice and ice-consolidated sediments. Automation technologies employed will demonstrate hands-off diagnostics and drill control, using novel vibrational dynamical analysis methods and model-based reasoning to monitor and identify drilling fault states before and during faults. Three field deployments, to a Mars-analog site with frozen impact crater fallback breccia, will support science goals, provide a rigorous test of drilling automation and lightweight permafrost drilling, and leverage past experience with the field site s particular logistics.
Pulgati, Fernando H; Ayup-Zouain, Ricardo N; Landau, Luiz; Fachel, Jandyra M G
2010-08-01
This paper describes the use of Bayesian spatial models to develop the concept of a spatial-temporal mask for the purpose of identifying regions in which before and after drilling effects are most clearly defined and from which the consequences of exposure of macrofauna and meiofauna to the release of drilling discharges can be evaluated over time. To determine the effects of drilling fluids and drill-cuttings on the marine benthic community, it is essential to know not only where discharged materials ended up within the possible impact area, but also the chemical concentrations to which biota were exposed during and after drilling. Barium and light hydrocarbons were used as chemical tracers for water-based and non-aqueous-based fluids in a shallow water site in the Campos Basin, off the coast of Brazil. Since the site showed evidence of exposure to waste material from earlier drilling, the analysis needed to take into account the background concentrations of these compounds. Using the Bayesian models, concentrations at unsampled sites were predicted and regions altered and previously contaminated were identified.
NASA Astrophysics Data System (ADS)
Chaurasia, Pratik Ranjan; Subhash
2018-06-01
An unknown indigenous driller combined the percussion and circulation drilling principles, resulting in the development of low cost, low weight manual boring set in the year 1990-1991/1991-1992, which revolutionized the shallow well drilling technology and made possible to drill about 4.5 million shallow bore wells in the State. This has changed the landscape of irrigated agriculture, changing the life of millions of small and marginal farmers and contributed a lot in increasing crop production and crop productivity. The developed drilling equipment locally known as "Pressure Boring Set" is manually operated, low cost and can be transported on bicycles. Drilling cost is also less. This low cost and simple technology made it possible to drill large number of shallow bore wells in comparatively short time span and less cost, consequently enhancing the rate of increase in irrigated area and in turn crop production and productivity. Cost of the boring set is also low, as compared to traditional sand pump hand boring set and suitable for alluvial areas.
NASA Astrophysics Data System (ADS)
Chaurasia, Pratik Ranjan; Subhash
2018-02-01
An unknown indigenous driller combined the percussion and circulation drilling principles, resulting in the development of low cost, low weight manual boring set in the year 1990-1991/1991-1992, which revolutionized the shallow well drilling technology and made possible to drill about 4.5 million shallow bore wells in the State. This has changed the landscape of irrigated agriculture, changing the life of millions of small and marginal farmers and contributed a lot in increasing crop production and crop productivity. The developed drilling equipment locally known as "Pressure Boring Set" is manually operated, low cost and can be transported on bicycles. Drilling cost is also less. This low cost and simple technology made it possible to drill large number of shallow bore wells in comparatively short time span and less cost, consequently enhancing the rate of increase in irrigated area and in turn crop production and productivity. Cost of the boring set is also low, as compared to traditional sand pump hand boring set and suitable for alluvial areas.
The Iceland Deep Drilling Project (IDDP): (I) A New Era in Geothermal Development?
NASA Astrophysics Data System (ADS)
Elders, W. A.; Fridleifsson, G. O.; Bird, D. K.; Reed, M. H.; Schiffman, P.; Zierenberg, R.
2007-12-01
The Iceland Deep Drilling Project (IDDP) announced in September 2007 that an international industrial consortium has signed a new contract to collaborate in exploratory deep drilling in Iceland. The main objective of the IDDP is to investigate whether it is economically feasible to produce energy from geothermal systems at supercritical conditions. This will require drilling to depths of 4 to 5 km in order to reach temperatures of 400 to 600°C. Today, geothermal wells in Iceland typically range up to 2.5 km in depth and produce steam at about 300°C, or less, at a rate sufficient to generate about 4 to 7 megawatts of electricity. It is estimated that producing steam from a well penetrating a reservoir with temperatures >450°C, and at a rate of 0.67 cubic meters a second, could generate 40 to 50 MWe. If IDDP's test of this concept proves successful, it could lead to major improvements in the development of high-temperature geothermal resources worldwide. The consortium collaborating to fund this investigation of supercritical geothermal energy consists of three leading Icelandic power companies, Hitaveita Sudurnesja Ltd., Landsvirkjun, Orkuveita Reykjavikur, together with Orkustofnun (the National Energy Authority) and Alcoa Inc. (an international aluminum company). The three power companies financed a feasibility study for the project that was completed in 2003. Each of the three power companies is committed to drill, at their own cost, a 3.5 to 4.0 km deep well in a geothermal field that they operate. The design of these wells will permit them to be deepened to 4.5 or 5.0 km by the IDDP, and funded by the consortium with additional funds from international scientific agencies. The first deep IDDP well will be drilled in the latter part of 2008 in the Krafla geothermal field near the northern end of the central rift zone of Iceland, within a volcanic caldera that has had recent volcanic activity. Two new wells, ~4 km deep, will then be drilled at the Hengill and the Reykjanes geothermal fields during 2009-2010, and subsequently deepened. In contrast to the fresh water systems at Krafla and Hengill, the Reykjanes geothermal system produces hydrothermally modified seawater on the Reykjanes peninsula, in southern Iceland, where the Mid-Atlantic Ridge comes on land in southern Iceland. Processes at depth at Reykjanes should be similar to those responsible for black smokers on ocean spreading centers. The IDDP has engendered considerable international scientific interest. The US National Science Foundation and the International Continental Scientific Drilling Program will jointly fund the coring and sampling for scientific studies. In preparation for studying the data and samples that will be recovered by deep drilling research is underway on samples from existing wells in the target geothermal fields, and on exposed "fossil" geothermal systems and active mid-ocean ridge systems that have conditions believed to be similar to those that will be encountered in deep drilling by the IDDP. Some of these initial scientific studies by US investigators are reported in the accompanying papers.
NASA Astrophysics Data System (ADS)
Conze, R.; Krysiak, F.; Wallrabe-Adams, H.; Graham, C. C.
2004-12-01
During August/September 2004, the Arctic Coring Expedition (ACEX) was used to trial a new Offshore Drilling Information System (OffshoreDIS). ACEX was the first Mission Specific Platform (MSP) expedition of the Integrated Ocean Drilling Programme (IODP), funded by the European Consortium for Ocean Research Drilling (ECORD). The British Geological Survey in conjunction with the University of Bremen and the European Petrophysics Consortium were the ECORD Science Operator (ESO) for ACEX. IODP MSP expeditions have very similar data management requirements and operate in similar working environments to the lake drilling projects conducted by the International Continental Scientific Drilling Program (ICDP), for example, the GLAD800, which has very restricted space on board and operates in difficult conditions. Both organizations require data capture and management systems that are mobile, flexible and that can be deployed quickly on small- to medium-sized drilling platforms for the initial gathering of data, and that can also be deployed onshore in laboratories where the bulk of the scientific work is conducted. ESO, therefore, decided that an adapted version of the existing Drilling Information System (DIS) used by ICDP projects would satisfy its requirements. Based on the existing DIS, an OffshoreDIS has been developed for MSP expeditions. The underlying data model is compatible with IODP(JANUS), the Bremen Core Repository, WDC-MARE/PANGAEA and the LacCore in Minneapolis. According to the specific expedition platform configuration and on-board workflow requirements for the Arctic, this data model, data pumps and user interfaces were adapted for the ACEX-OffshoreDIS. On the drill ship Vidar Viking the cores were catalogued and petrophysically logged using a GeoTek Multi-Sensor Core Logger System, while further initial measurements, lithological descriptions and biostratigraphic investigations were undertaken on the Oden, which provided laboratory facilities for the expedition. Onboard samples were registered in a corresponding sample archive on both vessels. The ACEX-OffshoreDIS used a local area network covering the two ships of the three icebreaker fleet by wireless LAN between the ships and partly wired LAN on the ships. A DIS-server was installed on each ship. These were synchronized by database replication and linked to a total of 10 client systems and label printers across both ships. The ACEX-OffshoreDIS will also be used for the scientific measurement and analysis phase of the expedition during the post-field operations `shore-party' in November 2004 at the Bremen Core Repository (BCR). The data management system employed in the Arctic will be reconfigured and deployed at the BCR. In addition, an eXtended DIS (XDIS) Web interface will be available. This will allow controlled sample distribution (core curation, sub-sampling) as well as sharing of data (registration, upload and download) with other laboratories which will be undertaking additional sampling and analyses. The OffshoreDIS data management system will be of long-term benefit to both IODP and ICDP, being deployed in forthcoming MSP offshore projects, ICDP lake projects and joint IODP-ICDP projects such as the New Jersey Coastal Plain Drilling Project.
Development of elastomeric isolators to reduce roof bolting machine drilling noise
Michael, Robert; Yantek, David; Johnson, David; Ferro, Ernie; Swope, Chad
2015-01-01
Among underground coal miners, hearing loss remains one of the most common occupational illnesses. In response to this problem, the National Institute for Occupational Safety and Health (NIOSH) Office of Mine Safety and Health Research (OMSHR) conducts research to reduce the noise emission of underground coal-mining equipment, an example of which is a roof bolting machine. Field studies show that, on average, drilling noise is the most significant contributor to a roof bolting machine operator’s noise exposure. NIOSH OMSHR has determined that the drill steel and chuck are the dominant sources of drilling noise. NIOSH OMSHR, Corry Rubber Corporation, and Kennametal, Inc. have developed a bit isolator that breaks the steel-to-steel link between the drill bit and drill steel and a chuck isolator that breaks the mechanical connection between the drill steel and the chuck, thus reducing the noise radiated by the drill steel and chuck, and the noise exposure of the roof bolter operator. This paper documents the evolution of the bit isolator and chuck isolator including various alternative designs which may enhance performance. Laboratory testing confirms that production bit and chuck isolators reduce the A-weighted sound level generated during drilling by 3.7 to 6.6 dB. Finally, this paper summarizes results of a finite element analysis used to explore the key parameters of the drill bit isolator and chuck isolator to understand the impact these parameters have on noise. PMID:26568650
Preparation on Earth for Drilling on Mars
2013-02-20
The development of the Mars rover Curiosity capabilities for drilling into a rock on Mars required years of development work. Seen here are some of the rocks used in bit development testing and lifespan testing at JPL in 2007.
Yanagawa, Katsunori; Nunoura, Takuro; McAllister, Sean M.; Hirai, Miho; Breuker, Anja; Brandt, Leah; House, Christopher H.; Moyer, Craig L.; Birrien, Jean-Louis; Aoike, Kan; Sunamura, Michinari; Urabe, Tetsuro; Mottl, Michael J.; Takai, Ken
2013-01-01
During the Integrated Ocean Drilling Program (IODP) Expedition 331 at the Iheya North hydrothermal system in the Mid-Okinawa Trough by the D/V Chikyu, we conducted microbiological contamination tests of the drilling and coring operations. The contamination from the drilling mud fluids was assessed using both perfluorocarbon tracers (PFT) and fluorescent microsphere beads. PFT infiltration was detected from the periphery of almost all whole round cores (WRCs). By contrast, fluorescent microspheres were not detected in hydrothermally active core samples, possibly due to thermal decomposition of the microspheres under high-temperature conditions. Microbial contamination from drilling mud fluids to the core interior subsamples was further characterized by molecular-based evaluation. The microbial 16S rRNA gene phylotype compositions in the drilling mud fluids were mainly composed of sequences of Beta- and Gammaproteobacteria, and Bacteroidetes and not archaeal sequences. The phylotypes that displayed more than 97% similarity to the sequences obtained from the drilling mud fluids were defined as possible contaminants in this study and were detected as minor components of the bacterial phylotype compositions in 13 of 37 core samples. The degree of microbiological contamination was consistent with that determined by the PFT and/or microsphere assessments. This study suggests a constructive approach for evaluation and eliminating microbial contamination during riser-less drilling and coring operations by the D/V Chikyu. PMID:24265628
Yanagawa, Katsunori; Nunoura, Takuro; McAllister, Sean M; Hirai, Miho; Breuker, Anja; Brandt, Leah; House, Christopher H; Moyer, Craig L; Birrien, Jean-Louis; Aoike, Kan; Sunamura, Michinari; Urabe, Tetsuro; Mottl, Michael J; Takai, Ken
2013-01-01
During the Integrated Ocean Drilling Program (IODP) Expedition 331 at the Iheya North hydrothermal system in the Mid-Okinawa Trough by the D/V Chikyu, we conducted microbiological contamination tests of the drilling and coring operations. The contamination from the drilling mud fluids was assessed using both perfluorocarbon tracers (PFT) and fluorescent microsphere beads. PFT infiltration was detected from the periphery of almost all whole round cores (WRCs). By contrast, fluorescent microspheres were not detected in hydrothermally active core samples, possibly due to thermal decomposition of the microspheres under high-temperature conditions. Microbial contamination from drilling mud fluids to the core interior subsamples was further characterized by molecular-based evaluation. The microbial 16S rRNA gene phylotype compositions in the drilling mud fluids were mainly composed of sequences of Beta- and Gammaproteobacteria, and Bacteroidetes and not archaeal sequences. The phylotypes that displayed more than 97% similarity to the sequences obtained from the drilling mud fluids were defined as possible contaminants in this study and were detected as minor components of the bacterial phylotype compositions in 13 of 37 core samples. The degree of microbiological contamination was consistent with that determined by the PFT and/or microsphere assessments. This study suggests a constructive approach for evaluation and eliminating microbial contamination during riser-less drilling and coring operations by the D/V Chikyu.
Jiang, Hua; Luo, Yi; McQuerrey, Joe
2018-02-01
Underground coalmine roof bolting operators exhibit a continued risk for overexposure to airborne levels of respirable coal and crystalline silica dust from the roof drilling operation. Inhaling these dusts can cause coal worker's pneumoconiosis and silicosis. This research explores the effect of drilling control parameters, specifically drilling bite depth, on the reduction of respirable dust generated during the drilling process. Laboratory drilling experiments were conducted and results demonstrated the feasibility of this dust control approach. Both the weight and size distribution of the dust particles collected from drilling tests with different bite depths were analyzed. The results showed that the amount of total inhalable and respirable dust was inversely proportional to the drilling bite depth. Therefore, control of the drilling process to achieve proper high-bite depth for the rock can be an important approach to reducing the generation of harmful dust. Different from conventional passive engineering controls, such as mist drilling and ventilation approaches, this approach is proactive and can cut down the generation of respirable dust from the source. These findings can be used to develop an integrated drilling control algorithm to achieve the best drilling efficiency as well as reducing respirable dust and noise.
A Comprehensive Well Testing Implementation during Exploration Phase in Rantau Dedap, Indonesia
NASA Astrophysics Data System (ADS)
Humaedi, M. T.; Alfiady; Putra, A. P.; Martikno, R.; Situmorang, J.
2016-09-01
This paper describes the implementation of comprehensive well testing programs during the 2014-2015 exploration drilling in Rantau Dedap Geothermal Field. The well testing programs were designed to provide reliable data as foundation for resource assessment as well as useful information for decision making during drilling. A series of well testing survey consisting of SFTT, completion test, heating-up downhole logging, discharge test, chemistry sampling was conducted to understand individual wells characteristics such as thermodynamic state of the reservoir fluid, permeability distribution, well output and fluid chemistry. Furthermore, interference test was carried out to investigate the response of reservoir to exploitation.
Improvement of core drill methods
DOE Office of Scientific and Technical Information (OSTI.GOV)
Gatz, J.L.
1975-07-01
This report documents results of a program to evaluate effectiveness of more or less conventional subsurface samplers in obtaining representative and undisturbed samples of noncohesive alluvial materials containing large quantities of gravels and cobbles. This is the first phase of a research program to improve core drill methods. Samplers evaluated consisted of the Lawrence Livermore Laboratory membrane sampler, 4-in. Denison sampler, 6-in. Dension sampler, 5-in. Modified Denison sampler, and 3-in. thinwall drive tube. Small representative samples were obtained with the Dension samplers; no undisturbed samples were obtained. The field work was accomplished in the Rhodes Canyon area, White Sands Misslemore » Range, New Mexico.« less
Data file: the 1976 Atlantic Margin Coring (AMCOR) Project of the U.S. Geological Survey
Poppe, Lawrence J.; Poppe, Lawrence J.
1981-01-01
In 1976, the U.S. Geological Survey conducted the Atlantic Margin Coring Project (AMCOR) to obtain information on stratigraphy, hydrology and water chemistry, mineral resources other than petroleum hydrocarbons, and geotechnical engineering properties at sites widely distributed along the Continental Shelf and Slope of the Eastern United States (Hathaway and others, 1976, 1979). This program's primary purpose was to investigate a broad variety of sediment properties, many of which had not been previously studied in this region. Previous studies of sediments recovered by core drilling in this region were usually limited to one or two aspects of the sediment properties (Hathaway and others, 1979, table 2). The AMCOR program was limited by two factors: water depth and penetration depth. Because the ship selected for the program, the Glomar Conception, lacked dynamic positioning capability, its anchoring capacity determined the maximum water depth in which drilling could take place. Although it was equipped to anchor in water 450 m deep and did so successfully at one site, we attmepted no drilling in water depths greater than 300 m. Strong Gulf Stream currents at the one attempted deep (443 m) site frustrated attempts to "spud in" to begin the hole.
Evaluation of generic types of drilling fluid using a risk-based analytic hierarchy process.
Sadiq, Rehan; Husain, Tahir; Veitch, Brian; Bose, Neil
2003-12-01
The composition of drilling muds is based on a mixture of clays and additives in a base fluid. There are three generic categories of base fluid--water, oil, and synthetic. Water-based fluids (WBFs) are relatively environmentally benign, but drilling performance is better with oil-based fluids (OBFs). The oil and gas industry developed synthetic-based fluids (SBFs), such as vegetable esters, olefins, ethers, and others, which provide drilling performance comparable to OBFs, but with lower environmental and occupational health effects. The primary objective of this paper is to present a methodology to guide decision-making in the selection and evaluation of three generic types of drilling fluids using a risk-based analytic hierarchy process (AHP). In this paper a comparison of drilling fluids is made considering various activities involved in the life cycle of drilling fluids. This paper evaluates OBFs, WBFs, and SBFs based on four major impacts--operations, resources, economics, and liabilities. Four major activities--drilling, discharging offshore, loading and transporting, and disposing onshore--cause the operational impacts. Each activity involves risks related to occupational injuries (safety), general public health, environmental impact, and energy use. A multicriteria analysis strategy was used for the selection and evaluation of drilling fluids using a risk-based AHP. A four-level hierarchical structure is developed to determine the final relative scores, and the SBFs are found to be the best option.
NASA Astrophysics Data System (ADS)
Pitcher, Craig; Gao, Yang
2017-03-01
The dual-reciprocating drill (DRD) is a biologically-inspired low-mass alternative to traditional drilling techniques, using backwards-facing teethed halves to grip the surrounding substrate, generating a traction force that reduces the required overhead penetration force. Previous experiments using a proof-of-concept test bench have provided evidence as to the significant role of sideways movements and lateral forces in improving drilling performance. The system is also progressing to a first system prototype concept, in which an actuation mechanism is integrated within the drill heads. To experimentally determine the effect of lateral motions, a new internal actuation mechanism was developed to allow the inclusion of controlled sideways movements, resulting in the creation of the circular and diagonal burrowing motions. This paper presents an investigation into the performance of the reciprocation and burrowing motions by testing them in a planetary regolith simulant. Analysis of force sensor measurements has shown a relationship between the penetration and traction forces and the internal friction of the mechanism and depth achieved. These tests have also experimentally demonstrated the benefit of lateral motions in drilling performance, with both the burrowing mechanisms and drilling tests performed at an angle able to penetrate further than traditional vertical reciprocation, leading to the proposition of new burrowing and diagonal drilling mechanics. From this, a new fully integrated system prototype can be developed which incorporates lateral motions that can optimise the drilling performance.
Laboratory ultrasonic pulse velocity logging for determination of elastic properties from rock core
NASA Astrophysics Data System (ADS)
Blacklock, Natalie Erin
During the development of deep underground excavations spalling and rockbursting have been recognized as significant mechanisms of violent brittle failure. In order to predict whether violent brittle failure will occur, it is important to identify the location of stiffness transitions that are associated with geologic structure. One approach to identify the effect of geologic structures is to apply borehole geophysical tools ahead of the tunnel advance. Stiffness transitions can be identified using mechanical property analysis surveys that combine acoustic velocity and density data to calculate acoustic estimates of elastic moduli. However, logistical concerns arise since the approach must be conducted at the advancing tunnel face. As a result, borehole mechanical property analyses are rarely used. Within this context, laboratory ultrasonic pulse velocity testing has been proposed as a potential alternative to borehole mechanical property analysis since moving the analysis to the laboratory would remove logistical constraints and improve safety for the evaluators. In addition to the traditional method of conducting velocity testing along the core axis, two new methodologies for point-focused testing were developed across the core diameter, and indirectly along intact lengths of drill core. The indirect test procedure was implemented in a continuous ultrasonic velocity test program along 573m of drill core to identify key geologic structures that generated transitions in ultrasonic elastic moduli. The test program was successful at identifying the location of geologic contacts, igneous intrusions, faults and shear structures. Ultrasonic values of Young's modulus and bulk modulus were determined at locations of significant velocity transitions to examine the potential for energy storage and energy release. Comparison of results from different ultrasonic velocity test configurations determined that the indirect test configuration provided underestimates for values of Young's modulus. This indicated that the test procedure will require modifications to improve coupling of the transducers to the core surface. In order to assess whether laboratory testing can be an alternative to borehole surveys, laboratory velocity testing must be directly assessed with results from acoustic borehole logging. There is also potential for the laboratory velocity program to be used to assess small scale stiffness changes, differences in mineral composition and the degree of fracturing of drill core.
Mixed reality temporal bone surgical dissector: mechanical design.
Hochman, Jordan Brent; Sepehri, Nariman; Rampersad, Vivek; Kraut, Jay; Khazraee, Milad; Pisa, Justyn; Unger, Bertram
2014-08-08
The Development of a Novel Mixed Reality (MR) Simulation. An evolving training environment emphasizes the importance of simulation. Current haptic temporal bone simulators have difficulty representing realistic contact forces and while 3D printed models convincingly represent vibrational properties of bone, they cannot reproduce soft tissue. This paper introduces a mixed reality model, where the effective elements of both simulations are combined; haptic rendering of soft tissue directly interacts with a printed bone model. This paper addresses one aspect in a series of challenges, specifically the mechanical merger of a haptic device with an otic drill. This further necessitates gravity cancelation of the work assembly gripper mechanism. In this system, the haptic end-effector is replaced by a high-speed drill and the virtual contact forces need to be repositioned to the drill tip from the mid wand. Previous publications detail generation of both the requisite printed and haptic simulations. Custom software was developed to reposition the haptic interaction point to the drill tip. A custom fitting, to hold the otic drill, was developed and its weight was offset using the haptic device. The robustness of the system to disturbances and its stable performance during drilling were tested. The experiments were performed on a mixed reality model consisting of two drillable rapid-prototyped layers separated by a free-space. Within the free-space, a linear virtual force model is applied to simulate drill contact with soft tissue. Testing illustrated the effectiveness of gravity cancellation. Additionally, the system exhibited excellent performance given random inputs and during the drill's passage between real and virtual components of the model. No issues with registration at model boundaries were encountered. These tests provide a proof of concept for the initial stages in the development of a novel mixed-reality temporal bone simulator.
Development of a Continuous Drill and Blast Tunneling Concept, Phase II
DOT National Transportation Integrated Search
1974-05-01
A spiral drilling pattern is described which offers high efficiency drill and blast tunnelling via frequent small blasts rather than occasional large blasts. Design work is presented for a machine which would stay at the face to provide essentially c...
Improved diamond coring bits developed for dry and chip-flush drilling
NASA Technical Reports Server (NTRS)
Decker, W. E.; Hampe, W. R.; Hampton, W. H.; Simon, A. B.
1971-01-01
Two rotary diamond bit designs, one operating with a chip-flushing fluid, the second including auger section to remove drilled chips, enhance usefulness of tool for exploratory and industrial core-drilling of hard, abrasive mineral deposits and structural masonry.
IMPROVED TUBULARS FOR BETTER ECONOMICS IN DEEP GAS WELL DRILLING USING MICROWAVE TECHNOLOGY
DOE Office of Scientific and Technical Information (OSTI.GOV)
Dinesh Agrawal; Paul Gigl; Mahlon Dennis
2005-03-01
The main objective of the research program has been to improve the rate-of-penetration in deep hostile environments by improving the life cycle and performance of coiled-tubing, an important component of a deep well drilling system for oil and gas exploration, by utilizing the latest developments in the microwave materials technology. Originally, it was proposed to accomplish this by developing an efficient and economically viable continuous microwave process to sinter continuously formed/extruded steel powder for the manufacture of seamless coiled tubing and other tubular products. However, based on the results and faced with insurmountable difficulties in the extrusion and de-waxing processes,more » the approach of achieving the goals of the program has been slightly changed. In the continuation proposal an approach of microwave sintering combined with Cold Isostatic Press (CIP) and joining (by induction or microwave) is adopted. This process can be developed into a semi-continuous sintering process if the CIP can produce parts fast enough to match the microwave sintering rates. Originally, the entire program was spread over three phases with the following goals: Phase I: Demonstration of the feasibility concept of continuous microwave sintering process for tubular steel products. Phase II: Design, building and testing of a prototype microwave system which shall be combined with a continuous extruder for steel tubular objects. Phase III: Execution of the plan for commercialization of the technology by one of the industrial partners. However, since some of the goals of the phase I were not completed, an extension of nine months was granted and we continued extrusion experiments, designed and built semicontinuous microwave sintering unit.« less
Assessment of the geothermal resources of the Socialist Republic of Vietnam
DOE Office of Scientific and Technical Information (OSTI.GOV)
Flynn, T.; Tien, Phan Cu; Schochert, D.
1997-12-31
More than 125 thermal springs, with temperatures greater than 30{degrees}C have been identified and catalogued by the General Department of Geology of Vietnam. Subsurface data are limited and fewer than 10 areas have been identified, on the basis of chemical geothermometers, as capable of supporting electric power production. Six sites in south-central Vietnam have recently been selected for exploration to determine their development potential for electrical power generation. Selected criteria included surface features, chemical geothermometers, proximity to regional faults trends, and regional requirements for electric power. Site visits were conducted to a total of eight areas in south central Vietnammore » where collateral economic developments suggest the need for a local, reliable source of electricity. Physical and visual information on geothermal springs and wells in Vietnam was compared to Nevada`s geothermal resources. Surface geothermal manifestations in Vietnam appear remarkably similar to those in Nevada. Outcrops adjacent to the geothermal areas indicate that Mesozoic-age granites are the most likely basement rocks. Quaternary basalts mapped throughout the study area may be responsible for the thermal anomaly. Initial exploration efforts will focus on three of the six sites, which together may be able to produce 40 to 60 MWe. A cooperative research program with selected Vietnamese governmental agencies includes geologic mapping, surface geophysical and geochemical surveys, and a graduated schedule of drilling programs, ranging in depth from 100 to 1,000 m. Results will be used to define a detailed, deep drilling and testing program at the three prime sites. Development of geothermal power in this region will boost local economic recovery and add stability to the national electric grid.« less
A new scientific drilling infrastructure in Sweden
NASA Astrophysics Data System (ADS)
Rosberg, J.-E.; Lorenz, H.
2012-04-01
A new scientific drilling infrastructure is currently under commissioning at Lund University in southern Sweden and is intended primarily for Swedish scientific drilling projects. However, it will be available to the scientific community and even industry when not occupied. The drill rig, a crawler mounted Atlas Copco CT20, was funded by the Swedish Research Council (VR) after an application by the Swedish scientific drilling community under the lead of Prof. Leif Bjelm, Lund University. As a national resource it is, together with support of the Swedish Deep Drilling Program (SDDP) and the Swedish membership in ICDP, part of VR's commitment to scientific drilling. The Atlas Copco CT20 is a top modern, versatile diamond wireline core-drilling rig which can handle P, H and N sizes. It can operate on very small drill sites (500-800 m2) and, thus, leaves a minimal environmental footprint. The crawler makes the rig ideal for operations in remote locations. A total of only 3-4 truckloads is necessary for mobilization of the basic drilling equipment. Main technical specifications are: Depth capacity coring, based on vertical water filled hole: P-size to around 1050 m, hole size 123 mm and core size 85 mm. H-size to around 1600 m, hole size 96 mm and core size 63 mm. N-size to around 2500 m, hole size 76 mm and core size 48 mm. Weight: Complete rig including crawler, wet - 23500 kg Dimensions in (length, width, height) transport position: 11560 x 2500 x 3750 mm. Available in-hole equipment: Complete core retrieval system for PQ, HQ and NQ-sizes, including PHD, HRQ (V-Wall) and NRQ (V-Wall) drill rods covering the maximum drilling depth for each size (see rig depth capacity above). Both dual and triple tube for HQ and NQ-sizes. Casing advancers (PW, HW, NW and BW). Casing PWT, HWT, NW and BW. Bits and reamers. Additional equipment: Mud cleaning and mixing system. MWD-system (Measurements While Drilling). Cementing equipment. Fishing tools (Bowen Spear). Blow Out Preventer (BOP). Deviation tools. Wireline packers. And more.
Computer Series, 60: Bits and Pieces, 23.
ERIC Educational Resources Information Center
Moore, John W., Ed.
1985-01-01
Describes: (1) an interactive computer simulation for a science fair display of chromatography inks; (2) analytical chemistry programs; (3) microcomputer-assisted drills in organic synthesis; (4) programs for conformation analysis of ethane and butane; (5) MOLPIX--a program for generating and displaying molecular structures; and (6) chemical…
JPRS Report, Science & Technology, USSR: Science & Technology Policy.
1987-07-10
gas exploration are being increased by 1.7-fold, while the amount of deep drilling is being increased by 1.5-fold. Such imposing tasks require new...territory based on geotraverses, ultradeep drilling , and space geological research has been introduced, a number of geodynamic models, including...cooperation of the ministry with the academy. The gauge of success of our cooperation is the implementation of these programs with the attainment of specific
Drill pipe threaded nipple connection design development
NASA Astrophysics Data System (ADS)
Saruev, A. L.; Saruev, L. A.; Vasenin, S. S.
2015-11-01
The paper presents the analysis of the behavior of the drill pipe nipple connection under the additional load generated by power pulses. The strain wave propagation through the nipple thread connection of drill pipes to the bottomhole is studied in this paper. The improved design of the nipple thread connection is suggested using the obtained experimental and theoretical data. The suggested connection design allows not only the efficient transmission of strain wave energy to a drill bit but also the automation of making-up and breaking-out drill pipes.
Ultrasonic/Sonic Mechanisms for Drilling and Coring
NASA Technical Reports Server (NTRS)
Bar-Cohen, Yoseph; Sherrit, Stewart; Dolgin, Benjamin; Askin, Steve; Peterson, Thomas M.; Bell, Bill; Kroh, Jason; Pal, Dharmendra; Krahe, Ron; Du, Shu
2003-01-01
Two apparatuses now under development are intended to perform a variety of deep-drilling, coring, and sensing functions for subsurface exploration of rock and soil. These are modified versions of the apparatuses described in Ultrasonic/Sonic Drill/Corers With Integrated Sensors (NPO-20856), NASA Tech Briefs, Vol. 25, No. 1 (January 2001), page 38. In comparison with the drilling equipment traditionally used in such exploration, these apparatuses weigh less and consume less power. Moreover, unlike traditional drills and corers, these apparatuses function without need for large externally applied axial forces.
Smart laser hole drilling for gas turbine combustors
NASA Astrophysics Data System (ADS)
Laraque, Edy
1991-04-01
A smart laser drilling system, which incorporates air flow inspection-in-process of the holes and intelligent real-time process parameter corrections, is described. The system along with good laser parameter developments is proved to be efficient for producing cooling holes which meet the highest aeronautical standards. To date, the system is used for percussion drilling of combustion chamber cooling holes. The system is considered to be very economical due to the drilling-on-the-fly capability that is capable of drilling up to 3 holes of 0.025-in. dia. per second.
Carty, Paul; Cooper, Michael R; Barr, Alan; Neitzel, Richard L; Balmes, John; Rempel, David
2017-07-01
Hammer drills are used extensively in commercial construction for drilling into concrete for tasks including rebar installation for structural upgrades and anchor bolt installation. This drilling task can expose workers to respirable silica dust and noise. The aim of this pilot study was to evaluate the effects of bit wear on respirable silica dust, noise, and drilling productivity. Test bits were worn to three states by drilling consecutive holes to different cumulative drilling depths: 0, 780, and 1560 cm. Each state of bit wear was evaluated by three trials (nine trials total). For each trial, an automated laboratory test bench system drilled 41 holes 1.3 cm diameter, and 10 cm deep into concrete block at a rate of one hole per minute using a commercially available hammer drill and masonry bits. During each trial, dust was continuously captured by two respirable and one inhalable sampling trains and noise was sampled with a noise dosimeter. The room was thoroughly cleaned between trials. When comparing results for the sharp (0 cm) versus dull bit (1560 cm), the mean respirable silica increased from 0.41 to 0.74 mg m-3 in sampler 1 (P = 0.012) and from 0.41 to 0.89 mg m-3 in sampler 2 (P = 0.024); levels above the NIOSH recommended exposure limit of 0.05 mg m-3. Likewise, mean noise levels increased from 112.8 to 114.4 dBA (P < 0.00001). Drilling productivity declined with increasing wear from 10.16 to 7.76 mm s-1 (P < 0.00001). Increasing bit wear was associated with increasing respirable silica dust and noise and reduced drilling productivity. The levels of dust and noise produced by these experimental conditions would require dust capture, hearing protection, and possibly respiratory protection. The findings support the adoption of a bit replacement program by construction contractors. © The Author 2017. Published by Oxford University Press on behalf of the British Occupational Hygiene Society.
Recent scientific and operational achievements of D/V Chikyu
NASA Astrophysics Data System (ADS)
Taira, Asahiko; Toczko, Sean; Eguchi, Nobu; Kuramoto, Shin'ichi; Kubo, Yusuke; Azuma, Wataru
2014-12-01
The D/V Chikyu, a scientific drilling vessel, is equipped with industry-standard riser capabilities. Riser drilling technology enables remarkable drilling and downhole logging capabilities and provides unprecedented hole-stability, enabling the shipboard team to retrieve high-quality wire-line logging data as well as well-preserved core samples. The 11 March 2011 Tohoku Oki mega-earthquake and tsunami cost over 18,000 casualties in NE Japan. Chikyu, docked in the Port of Hachinohe, was damaged by the tsunami. By April 2012, the ship was back in operation; drilling the toe of the Japan Trench fault zone where topographic surveys suggested there was up to 50 m eastward motion, the largest earthquake rupture ever recorded. During Integrated Ocean Drilling Program (IODP) Expeditions 343 and 343 T, Chikyu drilled 850 m below sea floor (mbsf) in 6,900+ m water depth and recovered core samples of a highly brecciated shear zone composed of pelagic claystone. A subseafloor observatory looking for temperature signatures caused by the fault friction during the earthquake, was installed and later successfully recovered. The recovered temperature loggers recorded data from which the level of friction during the mega-earthquake slip could be determined. Following Exp. 343, Chikyu began IODP Exp. 337, a riser drilling expedition into the Shimokita coal beds off Hachinohe, to study the deep subsurface biosphere in sedimentary units including Paleogene-Neogene coal beds. New records in scientific ocean drilling were achieved in deepest penetration (drilling reached 2,466 mbsf) and sample recovery. Currently Chikyu is conducting deep riser drilling at the Nankai Trough in the final stage of the NanTroSEIZE campaign. During the years 2011 to 2013, including drilling in the Okinawa Hydrothermal System, Chikyu's operational and scientific achievements have demonstrated that the ship's capabilities are vital for opening new frontiers in earth and biological sciences.
Automatic Fastening Large Structures: a New Approach
NASA Technical Reports Server (NTRS)
Lumley, D. F.
1985-01-01
The external tank (ET) intertank structure for the space shuttle, a 27.5 ft diameter 22.5 ft long externally stiffened mechanically fastened skin-stringer-frame structure, was a labor intensitive manual structure built on a modified Saturn tooling position. A new approach was developed based on half-section subassemblies. The heart of this manufacturing approach will be 33 ft high vertical automatic riveting system with a 28 ft rotary positioner coming on-line in mid 1985. The Automatic Riveting System incorporates many of the latest automatic riveting technologies. Key features include: vertical columns with two sets of independently operating CNC drill-riveting heads; capability of drill, insert and upset any one piece fastener up to 3/8 inch diameter including slugs without displacing the workpiece offset bucking ram with programmable rotation and deep retraction; vision system for automatic parts program re-synchronization and part edge margin control; and an automatic rivet selection/handling system.
Development of an advanced support system for site investigations
NASA Astrophysics Data System (ADS)
Mizuno, T.; Hama, K.; Iwatsuki, T.; Semba, T.
2009-12-01
JAEA has the responsibility for R&D to enhance reliability of High Level Waste (HLW) disposal technology and to develop safety assessment methodology with associated databases; these should support both the implementer (NUMO) and the relevant regulatory organizations. With this responsibility, JAEA has initiated development of advanced technology in the field of Knowledge Engineering. Known as the Information Synthesis and Interpretation System (ISIS), it incorporates knowledge currently being obtained in the Underground Research Laboratory (URL) projects in Expert System (ES) modules for the Japanese HLW disposal program. This knowledge includes fundamental understanding of relevant geological environments, technical know-how for the application of complex investigation techniques, experience gained in earlier site work, etc. However, much knowledge is not undocumented because the knowledge is treated as tacit knowledge and, without focused action soon, may be permanently lost. Therefore, a new approach is necessary to transfer the knowledge obtained in these URL projects to support the site characterization and subsequent safety assessment of potential repository sites by NUMO and the formulation of guidelines by regulatory organizations. In this paper, we introduce the ES for selecting tracers for borehole drilling. ES is the system built by applying electronic information technology to support the planning, conducting investigations and assessing of investigation results. Tracers are generally used for borehole drilling to monitor and quantitatively assess the degree of contamination of groundwater by drilling fluid. JAEA uses fluorescent dye as tracer in drilling fluid. When a fluorescent dye is used for drilling, suitable type and concentration must be selected. The technical points to be considered are; 1) linearity of fluorescent spectrum intensity with variations in concentration, 2) pH dependence of fluorescent spectrum intensity, 3) stability of fluorescent dye, 4) sorption/adsorption properties for rock being investigated, 5) detection limit of analyzer, 6) comparison of the fluorescent spectrum with dissolved organics and tracers used in other boreholes. In addition, costs and environmental impact are important factors to be considered. Thus, significant knowledge is needed in selecting the tracer for actual investigations. Fortunately, the ES for tracer selection already contains much knowledge needed. For example, the chemical data set for a suite of fluorescence dyes is in the ES, along with guidelines for their use. Therefore, this ES can support the use of fluorescent dye as tracer in actual investigations, even if the investigating scientists have little or no experience with it. In conclusion, the ES modules are and will be built as a support system for future researchers to perform optimized site investigations in a user-friendly manner. In this paper, we introduce the ES for selection of borehole drilling fluid tracer. Eventually, ES covering the full range of site investigation methods will be developed.