Update on Geothermal Direct-Use Installations in the United States
DOE Office of Scientific and Technical Information (OSTI.GOV)
Beckers, Koenraad J; Young, Katherine R; Snyder, Diana M.
Direct-use of geothermal energy currently has limited penetration in the United States, with an estimated installed capacity of about 500 MWth, supplying on the order of 0.01% of the total annual U.S. heat demand (about 30 EJ). We see higher penetration levels in other countries such as Iceland (about 90%) and Hungary (2.5%). An updated database of geothermal direct-use systems in the U.S. has been compiled and analyzed, building upon the Oregon Institute of Technology (OIT) Geo-Heat Center direct-use database. Types of directuse applications examined include hot springs resorts and pools, aquaculture farms, greenhouses, and district heating systems, among others;more » power-generating facilities and ground-source heat pumps were excluded. Where possible, the current operation status, open and close dates, well data, and other technical data were obtained for each entry. The database contains 545 installations, of which 407 are open, 108 are closed, and 30 have an unknown status. Spas are the most common type of installation, accounting for 50% of installations by number. Aquaculture installations (46 out of 407 open installations) account for the largest percentage (26%) of installed capacity in operation (129 MWth out of 501 MWth). Historical deployment curves show the installed capacity significantly increased in the 1970s and 1980s mainly due to development of geothermal district heating, aquaculture, and greenhouse systems. Since the 2000s, geothermal direct-use development appears to have slowed, and the number of sites in operation decreased due to closures. Case studies reveal multiple barriers to geothermal direct-use implementation and operation, including 1) existence of an information gap among stakeholders, developers, and the general public, 2) competition from cheap natural gas, and 3) the family-owned, small-scale nature of businesses might result in discontinuation among generations.« less
48 CFR 252.229-7004 - Status of contractors as a direct contractor (Spain).
Code of Federal Regulations, 2010 CFR
2010-10-01
..., development, maintenance, and operation of Spanish-American installations and facilities. (b) The Contractor... this contract by reference. (c) The Contractor shall apply to the appropriate Spanish authorities for approval of status as a Direct Contractor in order to complete duty-free import of non-Spanish equipment...
Prototype solar heating and cooling systems
NASA Technical Reports Server (NTRS)
1978-01-01
A collection of monthly status reports on the development of eight prototype solar heating and cooling systems is presented. The effort calls for the development, manufacture, test, system installation, maintenance, problem resolution, and performance evaluation. The systems are 3, 25, and 75 ton size units.
Prototype solar heating and cooling systems
NASA Technical Reports Server (NTRS)
1978-01-01
A collection of monthly status reports are given on the development of eight prototype solar heating and cooling systems. This effort calls for the development, manufacturing, test, system installation, maintenance, problem resolution, and performance evaluation. The systems are 3-, 25-, and 75-ton size units.
An Update on Structural Seal Development at NASA GRC
NASA Technical Reports Server (NTRS)
Dunlap, Pat; Steinetz, Bruce; Finkbeiner, Josh; DeMange, Jeff; Taylor, Shawn; Daniels, Chris; Oswald, Jay
2006-01-01
A viewgraph presentation describing advanced structural seal development for NASA exploration is shown. The topics include: 1) GRC Structural Seals Team Research Areas; 2) Research Areas & Objective; 3) Wafer Seal Geometry/Flow Investigations; 4) Wafer Seal Installation DOE Study; 5) Results of Wafer Seal Installation DOE Study; 6) Wafer Geometry Study: Thickness Variations; 7) Wafer Geometry Study: Full-Size vs. Half-Size Wafers; 8) Spring Tube Seal Development; 9) Resiliency Improvement for Rene 41 Spring Tube; 10) Spring Tube Seals: Go-Forward Plan; 11) High Temperature Seal Preloader Development: TZM Canted Coil Spring; 12) TZM Canted Coil Spring Development; 13) Arc Jet Test Rig Development; and 14) Arc Jet Test Rig Status.
NASA Technical Reports Server (NTRS)
1978-01-01
A collection of three quarterly reports are given covering the development of two prototype solar heating systems consisting of the following subsystems: collector, storage, control, transport, and site data acquisition. The two systems are being installed at York, Pennsylvania, and Manchester, New Hampshire.
Rivers of Energy: The Hydropower Potential. Worldwatch Paper No. 44.
ERIC Educational Resources Information Center
Deudney, Daniel
Described are the history, current status and future potential of hydroelectric power in the world. Issues discussed include the environmental and social impacts of dam construction, and the use of small-scale hydroelectric installations in developing nations. Also considered are hydroelectric development of the world's remote regions, the need to…
NASA Technical Reports Server (NTRS)
1978-01-01
The plan schedule and status of multiple objectives to be achieved in the development, manufacture, installation, and maintenance of two solar heated hot water prototype systems and two heat exchangers are reported. A computer program developed to resolve problems and evaluate system performance is described.
DEVELOPMENT OF PERMANENT MECHANICAL REPAIR SLEEVE FOR PLASTIC PIPE
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hitesh Patadia
2004-09-30
The report presents a comprehensive summary of the project status related to the development of a permanent mechanical repair fitting intended to be installed on damaged PE mains under blowing gas conditions. Specifically, the product definition has been developed taking into account relevant codes and standards and industry input. A conceptual design for the mechanical repair sleeve has been developed which meets the product definition.
NASA Astrophysics Data System (ADS)
Akiba, Masato; Jitsukawa, Shiroh; Muroga, Takeo
This paper describes the status of blanket technology and material development for fusion power demonstration plants and commercial fusion plants. In particular, the ITER Test Blanket Module, IFMIF, JAERI/DOE HFIR and JUPITER-II projects are highlighted, which have the important role to develop these technology. The ITER Test Blanket Module project has been conducted to demonstrate tritium breeding and power generation using test blanket modules, which will be installed into the ITER facility. For structural material development, the present research status is overviewed on reduced activation ferritic steel, vanadium alloys, and SiC/SiC composites.
Rep. Norton, Eleanor Holmes [D-DC-At Large
2014-02-27
House - 02/28/2014 Referred to the Subcommittee on Economic Development, Public Buildings and Emergency Management. (All Actions) Tracker: This bill has the status IntroducedHere are the steps for Status of Legislation:
NASA Astrophysics Data System (ADS)
Maguire, J. F.; Yuan, J.
2009-10-01
This paper will describe the status of three key programs currently underway at American Superconductor Corp. The first program is the LIPA project which is a transmission voltage high temperature superconducting cable program, with funding support from the US Department of Energy. The 600 m cable, capable of carrying 574 MVA, was successfully installed and commissioned in LIPA grid on April 22, 2008. An overview of the project, system level design details and operational data will be provided. In addition, the status of the newly awarded LIPA II project will be described. The second program is Project Hydra, with funding support from the US Department of Homeland Security, to design, develop and demonstrate an HTS cable with fault current limiting functionality. The cable is 300 m long and is being designed to carry 96 MVA at a distribution level voltage of 13.8 kV. The cable will be permanently installed and energized in Manhattan, New York in 2010. The initial status of Project Hydra will be presented. The final program to be discussed is a transmission voltage, high temperature superconducting fault current limiter funded by the US DOE. The project encompasses the design, construction and test of a 115 kV FCL for power transmission within a time frame of 4-5 years. Installation and testing are planned for a Southern California Edison substation. A project overview and progress under the first phase will be reported.
Microcomputer network for control of a continuous mining machine. Information circular/1993
DOE Office of Scientific and Technical Information (OSTI.GOV)
Schiffbauer, W.H.
1993-01-01
The paper details a microcomputer-based control and monitoring network that was developed in-house by the U.S. Bureau of Mines, and installed on a Joy 14 continuous mining machine. The network consists of microcomputers that are connected together via a single twisted pair cable. Each microcomputer was developed to provide a particular function in the control process. Machine-mounted microcomputers in conjunction with the appropriate sensors provide closed-loop control of the machine, navigation, and environmental monitoring. Off-the-machine microcomputers provide remote control of the machine, sensor status, and a connection to the network so that external computers can access network data and controlmore » the continuous mining machine. Although the network was installed on a Joy 14 continuous mining machine, its use extends beyond it. Its generic structure lends itself to installation onto most mining machine types.« less
Donovan, Carl; Harwood, John; King, Stephanie; Booth, Cormac; Caneco, Bruno; Walker, Cameron
2016-01-01
There are many developments for offshore renewable energy around the United Kingdom whose installation typically produces large amounts of far-reaching noise, potentially disturbing many marine mammals. The potential to affect the favorable conservation status of many species means extensive environmental impact assessment requirements for the licensing of such installation activities. Quantification of such complex risk problems is difficult and much of the key information is not readily available. Expert elicitation methods can be employed in such pressing cases. We describe the methodology used in an expert elicitation study conducted in the United Kingdom for combining expert opinions based on statistical distributions and copula-like methods.
Wireless sensor network for monitoring soil moisture and weather conditions
USDA-ARS?s Scientific Manuscript database
A wireless sensor network (WSN) was developed and deployed in three fields to monitor soil water status and collect weather data for irrigation scheduling. The WSN consists of soil-water sensors, weather sensors, wireless data loggers, and a wireless modem. Soil-water sensors were installed at three...
Development and reduction of hypertension and oxidative stress among detergent industry workers.
Boojar, Massod M A; Goodarzi, Faranak; Boojar, Manochehr M A
2004-12-01
Hypertension status and oxidative stress parameters were assessed in 291 workers (hypertensive workers were divided into three grades, non-equivalently) at two detergent production plants, one of which included enzymes in the detergent (n=138) and another which did not (n=153), and 45 control workers in another industry three times (at the time of employment, 7 yrs later at the time of installation of a filter system, and about 3 yrs later). Malondialdehyde (MDA) was measured by high-performance liquid chromatography, antioxidant enzymes and lipid status by ultraviolet-visible spectrophotometry, trace elements by atomic absorption spectroscopy, and blood pressure using an oscilometric device. Prior to filter system installation, enzyme-exposed workers had significantly higher MDA, antioxidant enzyme activities, and prevalence of hypertension, compared with controls. The filter system reduced airborne detergent and enzyme dusts, resulting in a decreased prevalence of hypertension and a significant improvement in workers' oxidative stress indicators. Alterations in antioxidant status may result from the cumulative effect of high levels of detergent and enzyme in airborne dust in the workplace.
Status of FEP encapsulated solar cell modules used in terrestrial applications
NASA Technical Reports Server (NTRS)
Ratajczak, A. F.; Forestieri, A. F.
1974-01-01
The Lewis Research Center has been engaged in transferring the FEP encapsulated solar cell technology developed for the space program to terrestrial applications. FEP encapsulated solar cell modules and arrays were designed and built expressly for terrestrial applications. Solar cell power systems were installed at three different land sites, while individual modules are undergoing marine environment tests. Four additional power systems are being completed for installation during the summer of 1974. These tests have revealed some minor problems which have been corrected. The results confirm the inherent utility of FEP encapsulated terrestrial solar cell systems.
The Army Priority List of At-Risk Species: 2009-2010 Status Update
2010-09-01
moved three species closer to formal TES status. Results of this work should help target proactive actions, such as participation in conservation ... Conservation Branch, Installation Services, OACSIM. The work was completed by the Ecological Process Branch (CN-N) of the Installations Division (CN...for the conservation of threatened and endangered plants and animals and the habitats in which they are found (USEPA 2009). The ESA regulates Feder
Ten-year response of competing vegetation after oak shelterwood treatments in West Virginia
Gary W. Miller; James N. Kochenderfer; Jeffrey D. Kochenderfer; Kurt W. Gottschalk
2014-01-01
Successful oak regeneration depends on the relative status of advanced oak reproduction and associated competing woody vegetation present when harvests or other stand-replacing disturbances occur. This study was installed to quantify the effect of microsite light availability and deer browsing on the development of advanced northern red oak (Quercus rubra...
Passive thermosyphon solar heating and cooling module with supplementary heating
NASA Technical Reports Server (NTRS)
1977-01-01
A collection of three quarterly reports from Sigma Research, Inc., covering progress and status from January through September 1977 are presented. Three heat exchangers are developed for use in a solar heating and cooling system for installation into single-family dwellings. Each exchanger consists of one heating and cooling module and one submerged electric water heating element.
Dish concentrators for solar thermal energy - Status and technology development
NASA Technical Reports Server (NTRS)
Jaffe, L. D.
1981-01-01
Comparisons are presented of point-focusing, or 'dish' solar concentrator system features, development status, and performance levels demonstrated to date. In addition to the requirements of good optical efficiency and high geometric concentration ratios, the most important future consideration in solar thermal energy dish concentrator design will be the reduction of installed and lifetime costs, as well as the materials and labor costs of production. It is determined that technology development initiatives are needed in such areas as optical materials, design wind speeds and wind loads, structural configuration and materials resistance to prolonged exposure, and the maintenance of optical surfaces. The testing of complete concentrator systems, with energy-converting receivers and controls, is also necessary. Both reflector and Fresnel lens concentrator systems are considered.
21 CFR 820.86 - Acceptance status.
Code of Federal Regulations, 2010 CFR
2010-04-01
... QUALITY SYSTEM REGULATION Acceptance Activities § 820.86 Acceptance status. Each manufacturer shall... product which has passed the required acceptance activities is distributed, used, or installed. ...
Installation Status of the Electron Beam Profiler for the Fermilab Main Injector
DOE Office of Scientific and Technical Information (OSTI.GOV)
Thurman-Keup, R.; Alvarez, M.; Fitzgerald, J.
2015-11-06
The planned neutrino program at Fermilab requires large proton beam intensities in excess of 2 MW. Measuring the transverse profiles of these high intensity beams is challenging and often depends on non-invasive techniques. One such technique involves measuring the deflection of a probe beam of electrons with a trajectory perpendicular to the proton beam. A device such as this is already in use at the Spallation Neutron Source at ORNL and the installation of a similar device is underway in the Main Injector at Fermilab. The present installation status of the electron beam profiler for the Main Injector will bemore » discussed together with some simulations and test stand results.« less
A microcomputer network for control of a continuous mining machine
DOE Office of Scientific and Technical Information (OSTI.GOV)
Schiffbauer, W.H.
1993-12-31
This report details a microcomputer-based control and monitoring network that was developed in-house by the U.S. Bureau of Mines and installed on a continuous mining machine. The network consists of microcomputers that are connected together via a single twisted-pair cable. Each microcomputer was developed to provide a particular function in the control process. Machine-mounted microcomputers, in conjunction with the appropriate sensors, provide closed-loop control of the machine, navigation, and environmental monitoring. Off-the-machine microcomputers provide remote control of the machine, sensor status, and a connection to the network so that external computers can access network data and control the continuous miningmore » machine. Because of the network`s generic structure, it can be installed on most mining machines.« less
Risk Monitoring for Space Systems
NASA Astrophysics Data System (ADS)
Kafka, Peter
2005-12-01
The paper shows the idea, the drivers and some basics within the wide spread field of Risk Monitoring Systems (RMS) for nuclear power plants. Pros and cons are summarised and the status of last developments is touched. Based on these insights the adoption of RMS for space systems and installations is discussed with the aim to contribute to the advancement of space systems safety.
Laser R and D in the armed services
NASA Astrophysics Data System (ADS)
Seidel, R. W.; Bromberg, J. L.
1984-09-01
During the year, September 15, 1983 - September 15, 1984, Dr. Joan Lisa Bromberg has investigated the history of the laser through the interviewing of laser industry pioneers and leaders in California's Bay area and the Murray Hill branch of AT & T's Bell Labs. The status of processing of the interviewee's tapes is listed. During the course of the first year of our project, Dr. Robert W. Seidel has investigated the history of military laser research and development through the exploitation of the Department of Defense's Research and Development data bases, including the Research and Development Plans, Work Unit Information Summaries, and the Technical Report Abstracts of the Defense Technical Information Center; published and unpublished technical reports of military laser research and development available through DTIC and at military installations; visits to military installations and research facilities holding manuscript materials relating to history of laser research and development; and formal and informal interviews with participants in military laser R&D projects.
Update on Geothermal Direct-Use Installations in the United States
Beckers, Koenraad F.; Snyder, Diana M.; Young, Katherine R.
2017-03-02
An updated database of geothermal direct-use systems in the U.S. has been compiled and analyzed, building upon the Oregon Institute of Technology (OIT) Geo-Heat Center direct-use database. Types of direct-use applications examined include hot springs resorts and pools, aquaculture farms, greenhouses, and district heating systems, among others; power-generating facilities and ground-source heat pumps were excluded. Where possible, the current operation status, open and close dates, well data, and other technical data were obtained for each entry. The database contains 545 installations, of which 407 are open, 108 are closed, and 30 have an unknown status. A report is also included which details and analyzes current geothermal direct-use installations and barriers to further implementation.
DE-EE0006714 Final Report-Project Icebreaker™
DOE Office of Scientific and Technical Information (OSTI.GOV)
Wagner, Lorry; Karpinski, David; Nagusky, Beth
Project Icebreaker, a 20 Megawatt offshore wind project 8 miles north of Cleveland, OH in Lake Erie, has been under development by the Lake Erie Energy Development Corporation since 2009. Significant development efforts were completed prior to the award of DE-EE0006714 (December 2014). This report describes the status of the work performed under award DE-EE0006714. The work was organized into several categories or tasks. The report presents the status of that work in each of eleven (11) main tasks: 1) State and Federal Permits; 2) Mono Bucket Foundation Engineering; 3) Construction and Installation Engineering; 4) Cable Route Survey; 5) Electricalmore » System Design; 6) Power Off-take; 7) Project Costs and Risk Management; 8) Operations and Maintenance Planning; 9) Domestic Supply Chain Development; 10) Instrumentation Planning; and 11) Department of Energy Review.« less
Industrial Hardening: 1982 Technical Status Report.
1983-05-01
for nuclear disaster ; establish additional contacts with industry to foster development of emergency preparedness, in general, and nuclear disaster preparedness...versatility for the situation following a nuclear disaster ). Recent governmat installations of such units have been made on an experimental basis...that industry could use to carry on vital functions now, in an emergency situation, and in event of a nuclear disaster . At its simplest, the
Development of guided horizontal boring tools. Final report, June 1984-March 1991
DOE Office of Scientific and Technical Information (OSTI.GOV)
McDonald, W.J.; Herben, W.C.; Pittard, G.T.
Maurer Engineering Inc. (MEI), under a contract with the Gas Research Institute (GRI), has led a team of research and manufacturing companies with the goal of developing a guided boring tool for installing gas distribution piping. Studies indicated guided horizontal boring systems can provide gas utilities with a more effective and economical method for installing pipe than conventional techniques with a potential cost savings of at least 15% to 50%. A comprehensive state of technology review of horizontal boring tools identified concepts appropriate to being directionally controlled. Development of a universal system was found impractical because the requirements for shortmore » and extended range systems are significantly different. Concepts for steering and tracking were evaluated through lab and field experiments which progressed from proof of concept tests to cooperative field tests with gas utilities at the various stages of system development. The systems were brought to commercial status with needed modifications and the technology transferred to licensees who would market the systems. The program resulted in the development and commercialization of five distinct guided boring system. Pipe can now be installed more rapidly over longer distances with a minimal amount of excavation required for launching and retrieval. This means increased work crew productivity, reduced disturbance to landscaping and environmentally sensitive areas, and reduced traffic disruption and public inconvenience.« less
Utility photovoltaic group: Status report
NASA Astrophysics Data System (ADS)
Serfass, Jeffrey A.; Hester, Stephen L.; Wills, Bethany N.
1996-01-01
The Utility PhotoVoltaic Group (UPVG) was formed in October of 1992 with a mission to accelerate the use of cost-effective small-scale and emerging grid-connected applications of photovoltaics for the benefit of electric utilities and their customers. The UPVG is now implementing a program to install up to 50 megawatts of photovoltaics in small-scale and grid-connected applications. This program, called TEAM-UP, is a partnership of the U.S. electric utility industry and the U.S. Department of Energy to help develop utility PV markets. TEAM-UP is a utility-directed program to significantly increase utility PV experience by promoting installations of utility PV systems. Two primary program areas are proposed for TEAM-UP: (1) Small-Scale Applications (SSA)—an initiative to aggregate utility purchases of small-scale, grid-independent applications; and (2) Grid-Connected Applications (GCA)—an initiative to identify and competitively award cost-sharing contracts for grid-connected PV systems with high market growth potential, or collective purchase programs involving multiple buyers. This paper describes these programs and outlines the schedule, the procurement status, and the results of the TEAM-UP process.
Vacuum status-display and sector-conditioning programs
NASA Astrophysics Data System (ADS)
Skelly, J.; Yen, S.
1990-08-01
Two programs have been developed for observation and control of the AGS vacuum system, which include the following notable features: (1) they incorporate a graphical user interface and (2) they are driven by a relational database which describes the vacuum system. The vacuum system comprises some 440 devices organized into 28 vacuum sectors. The status-display program invites menu selection of a sector, interrogates the relational database for relevant vacuum devices, acquires live readbacks and posts a graphical display of their status. The sector-conditioning program likewise invites sector selection, produces the same status display and also implements process control logic on the sector devices to pump the sector down from atmospheric pressure to high vacuum over a period extending several hours. As additional devices are installed in the vacuum system, the devices are added to the relational database; these programs then automatically include the new devices.
Direct launch using the electric rail gun
NASA Technical Reports Server (NTRS)
Barber, J. P.
1983-01-01
The concept explored involves using a large single stage electric rail gun to achieve orbital velocities. Exit aerodynamics, launch package design and size, interior ballistics, system and component sizing and design concepts are treated. Technology development status and development requirements are identified and described. The expense of placing payloads in Earth orbit using conventional chemical rockets is considerable. Chemical rockets are very inefficient in converting chemical energy into payload kinetic energy. A rocket motor is relatively expensive and is usually expended on each launch. In addition specialized and expensive forms of fuel are required. Gun launching payloads directly to orbit from the Earth's surface is a possible alternative. Guns are much more energy efficient than rockets. The high capital cost of the gun installation can be recovered by reusing it over and over again. Finally, relatively inexpensive fuel and large quantities of energy are readily available to a fixed installation on the Earth's surface.
must pay to reimburse federal agencies for the EVSE procurement, installation, and use. Federal agencies may provide EVSE through a contract with a vendor. GSA must submit a report to Congress by EVSE installation requests from other federal agencies, and the status of requests for EVSE from other
Federal Register 2010, 2011, 2012, 2013, 2014
2011-02-23
..., Continuous Flow Passenger Oxygen Mask Assembly, Part Numbers 174006-(), 174080-(), 174085-(), 174095... manufacturer and part number of the oxygen mask assemblies installed, an inspection to determine the manufacturing date and modification status if certain oxygen mask assemblies are installed, and corrective...
The American mobile satellite system
NASA Technical Reports Server (NTRS)
Garner, William B.
1990-01-01
During 1989, the American Mobile Satellite Corporation (AMSC) was authorized to construct, launch, and operate satellites to provide mobile satellite services (MSS) to the U.S. and Puerto Rico. The AMSC has undertaken three major development programs to bring a full range of MSS services to the U.S. The first program is the space segment program that will result in the construction and launch of the satellites as well as the construction and installation of the supporting ground telemetry and command system. The second segment will result in the specification, design, development, construction, and installation of the Network Control System necessary for managing communications access to the satellites, and the specification and development of ground equipment for standard circuit switched and packet switched communications services. The third program is the Phase 1 program to provide low speed data services within the U.S. prior to availability of the AMSC satellites and ground segment. Described here are the present status and plans for these three programs as well as an update on related business arrangements and regulatory matters.
Cargo Movement Operations (CMOS) Increment I Installation and Checkout Plan for Langley AFB
1990-10-28
ERCI ACCEPTS COMMENT: YES [ ] NO [ ] COMMENT DISPOSITION: ACCEPT [ ] REJECT [ ] COMMENT STATUS: OPEN [ ] CLOSED [ ] Cmnt Page Paragraph No. No...document. CMOS PMO ACCEPTS COMMENT: YES [ ) NO [ ] ERCI ACCEPTS COMMENT: YES [ ] NO [ ] COMMENT DISPOSITION: COMMENT STATUS: OPEN [ ] CLOSED [
40 CFR 265.442 - Design and installation of new drip pads.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 40 Protection of Environment 26 2011-07-01 2011-07-01 false Design and installation of new drip pads. 265.442 Section 265.442 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES (CONTINUED) INTERIM STATUS STANDARDS FOR OWNERS AND OPERATORS OF HAZARDOUS WASTE TREATMENT, STORAGE, AND DISPOSAL FACILITIES Drip Pads §...
Status of the ion sources developments for the Spiral2 project at GANILa)
NASA Astrophysics Data System (ADS)
Lehérissier, P.; Bajeat, O.; Barué, C.; Canet, C.; Dubois, M.; Dupuis, M.; Flambard, J. L.; Frigot, R.; Jardin, P.; Leboucher, C.; Lemagnen, F.; Maunoury, L.; Osmond, B.; Pacquet, J. Y.; Pichard, A.; Thuillier, T.; Peaucelle, C.
2012-02-01
The SPIRAL 2 facility is now under construction and will deliver either stable or radioactive ion beams. First tests of nickel beam production have been performed at GANIL with a new version of the large capacity oven, and a calcium beam has been produced on the heavy ion low energy beam transport line of SPIRAL 2, installed at LPSC Grenoble. For the production of radioactive beams, several target/ion-source systems (TISSs) are under development at GANIL as the 2.45 GHz electron cyclotron resonance ion source, the surface ionization source, and the oven prototype for heating the uranium carbide target up to 2000 °C. The existing test bench has been upgraded for these developments and a new one, dedicated for the validation of the TISS before mounting in the production module, is under design. Results and current status of these activities are presented.
2013 Wind Technologies Market Report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Wiser, R.; Bolinger, M.; Barbose, G.
2014-08-01
This annual report provides a detailed overview of developments and trends in the U.S. wind power market, with a particular focus on 2013. This 2013 edition updates data presented in previous editions while highlighting key trends and important new developments. The report includes an overview of key installation-related trends; trends in wind power capacity growth; how that growth compares to other countries and generation sources; the amount and percentage of wind energy in individual states; the status of offshore wind power development and the quantity of proposed wind power capacity in various interconnection queues in the United States.
Nuclear Power Plant Mechanical Component Flooding Fragility Experiments Status
DOE Office of Scientific and Technical Information (OSTI.GOV)
Pope, C. L.; Savage, B.; Johnson, B.
This report describes progress on Nuclear Power Plant mechanical component flooding fragility experiments and supporting research. The progress includes execution of full scale fragility experiments using hollow-core doors, design of improvements to the Portal Evaluation Tank, equipment procurement and initial installation of PET improvements, designation of experiments exploiting the improved PET capabilities, fragility mathematical model development, Smoothed Particle Hydrodynamic simulations, wave impact simulation device research, and pipe rupture mechanics research.
Advances in the FTU collective Thomson scattering system
DOE Office of Scientific and Technical Information (OSTI.GOV)
Bin, W., E-mail: wbin@ifp.cnr.it; Bruschi, A.; Grosso, G.
The new collective Thomson scattering diagnostic installed on the Frascati Tokamak Upgrade device started its first operations in 2014. The ongoing experiments investigate the presence of signals synchronous with rotating tearing mode islands, possibly due to parametric decay processes, and phenomena affecting electron cyclotron beam absorption or scattering measurements. The radiometric system, diagnostic layout, and data acquisition system were improved accordingly. The present status and near-term developments of the diagnostic are presented.
KSC facilities status and planned management operations. [for Shuttle launches
NASA Technical Reports Server (NTRS)
Gray, R. H.; Omalley, T. J.
1979-01-01
A status report is presented on facilities and planned operations at the Kennedy Space Center with reference to Space Shuttle launch activities. The facilities are essentially complete, with all new construction and modifications to existing buildings almost finished. Some activity is still in progress at Pad A and on the Mobile Launcher due to changes in requirements but is not expected to affect the launch schedule. The installation and testing of the ground checkout equipment that will be used to test the flight hardware is now in operation. The Launch Processing System is currently supporting the development of the applications software that will perform the testing of this flight hardware.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Yokosawa, Akihiko
Experimental results are reviewed on polarization phenomena in nucleon-nucleon scattering at intermediate energies. The present status of S = 0 dibaryon resonances is presented. The status of the Fermilab polarized beam program is presented, including the construction of polarized beam, two polarimeters being installed in the experimental hall, and the experimental program. (LEW)
Satellite freeze forecast system
NASA Technical Reports Server (NTRS)
Martsolf, J. D. (Principal Investigator)
1983-01-01
Provisions for back-up operations for the satellite freeze forecast system are discussed including software and hardware maintenance and DS/1000-1V linkage; troubleshooting; and digitized radar usage. The documentation developed; dissemination of data products via television and the IFAS computer network; data base management; predictive models; the installation of and progress towards the operational status of key stations; and digital data acquisition are also considered. The d addition of dew point temperature into the P-model is outlined.
Status and Progress of a Fault Current Limiting Hts Cable to BE Installed in the con EDISON Grid
NASA Astrophysics Data System (ADS)
Maguire, J.; Folts, D.; Yuan, J.; Henderson, N.; Lindsay, D.; Knoll, D.; Rey, C.; Duckworth, R.; Gouge, M.; Wolff, Z.; Kurtz, S.
2010-04-01
In the last decade, significant advances in the performance of second generation (2G) high temperature superconducting wire have made it suitable for commercially viable applications such as electric power cables and fault current limiters. Currently, the U.S. Department of Homeland Security is co-funding the design, development and demonstration of an inherently fault current limiting HTS cable under the Hydra project with American Superconductor and Consolidated Edison. The cable will be approximately 300 m long and is being designed to carry 96 MVA at a distribution level voltage of 13.8 kV. The underground cable will be installed and energized in New York City. The project is led by American Superconductor teamed with Con Edison, Ultera (Southwire and nkt cables joint venture), and Air Liquide. This paper describes the general goals, design criteria, status and progress of the project. Fault current limiting has already been demonstrated in 3 m prototype cables, and test results on a 25 m three-phase cable will be presented. An overview of the concept of a fault current limiting cable and the system advantages of this unique type of cable will be described.
Photovoltaics in the Department of Defense
NASA Astrophysics Data System (ADS)
Chapman, Richard N.
1997-02-01
This paper documents the history of photovoltaic use within the Department of Defense leading up to the installation of 2.1 MW of photovoltaics underway today. This history describes the evolution of the Department of Defense's Tri-Service Photovoltaic Review Committee and the committee's strategic plan to realize photovoltaic's full potential through outreach, conditioning of the federal procurement system, and specific project development. The Photovoltaic Review Committee estimates photovoltaic's potential at nearly 4,000 MW, of which about 700 MW are considered to be cost-effective at today's prices. The paper describes photovoltaic's potential within the Department of Defense, the status and features of the 2.1-MW worth of photovoltaic systems under installation, and how these systems are selected and implemented. The paper also documents support provided to the Department of Defense by the Department of Energy dating back to the late 70s.
Performances and first science results with the VEGA/CHARA visible instrument
NASA Astrophysics Data System (ADS)
Mourard, D.; Tallon, M.; Bério, Ph.; Bonneau, D.; Chesneau, O.; Clausse, J. M.; Delaa, O.; Nardetto, N.; Perraut, K.; Spang, A.; Stee, Ph.; Tallon-Bosc, I.; McAlister, H.; ten Brummelaar, T.; Sturmann, J.; Sturmann, L.; Turner, N.; Farrington, C.; Goldfinger, P. J.
2010-07-01
This paper presents the current status of the VEGA (Visible spEctroGraph and polArimeter) instrument installed at the coherent focus of the CHARA Array, Mount Wilson CA. Installed in september 2007, the first science programs have started during summer 2008 and first science results are now published. Dedicated to high angular (0.3mas) and high spectral (R=30000) astrophysical studies, VEGA main objectives are the study of circumstellar environments of hot active stars or interactive binary systems and a large palette of new programs dedicated to fundamental stellar parameters. We will present successively the main characteristics of the instrument and its current performances in the CHARA environment, a short summary of two science programs and finally we will develop some studies showing the potential and difficulties of the 3 telescopes mode of VEGA/CHARA.
Philippines: Small-scale renewable energy update
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1997-12-01
This paper gives an overview of the application of small scale renewable energy sources in the Philippines. Sources looked at include solar, biomass, micro-hydroelectric, mini-hydroelectric, wind, mini-geothermal, and hybrid. A small power utilities group is being spun off the major utility, to provide a structure for developing rural electrification programs. In some instances, private companies have stepped forward, avoiding what is perceived as overwhelming beaurocracy, and installed systems with private financing. The paper provides information on survey work which has been done on resources, and the status of cooperative programs to develop renewable systems in the nation.
NASA Astrophysics Data System (ADS)
Casagrande, F.; Ganni, V.; Knudsen, P.; Jones, S.; Sidi-Yekhlef, A.; Tatsumoto, H.; Nguyen, C.; Fila, A.; Vargas, G.; Dudley, C.; Joseph, N.; Stanley, S.; Dixon, K.; Norton, R.; Laverdure, N.; Yang, S.
2017-12-01
Construction and installation of the FRIB 4.5 K helium refrigeration system is nearing completion, with compressor system commissioning and 4.5 K refrigerator commissioning on schedule to occur in late 2017. The LINAC 4.5 K helium distribution system, all major process equipment, and the cryogenic distribution for the sub-systems have been procured and delivered. The sub-atmospheric cold box fabrication is planned to begin the summer of 2017, which is on schedule for commissioning in the spring of 2018. Commissioning of the support systems, such as the helium gas storage, helium purifier, and oil processor is planned to be complete by the summer of 2017. This paper presents details of the equipment procured, installation status and commissioning plans.
Progress on the Development of the Nb 3Sn 11T Dipole for the High Luminosity Upgrade of LHC
Savary, Frederic; Bajko, Marta; Bordini, Bernardo; ...
2017-02-08
The high-luminosity large hadron collider (LHC) project at CERN entered into the production phase in October 2015 after the completion of the design study phase. In the meantime, the development of the 11 T dipole needed for the upgrade of the collimation system of the machine made significant progress with very good performance of the first two-in-one magnet model of 2-m length made at CERN. The 11 T dipole, which is more powerful than the current main dipoles of LHC, can be made shorter with an equivalent integrated field. This will allow creating space for the installation of additional collimatorsmore » in specific locations of the dispersion suppressor regions. Following tests carried out during heavy ions runs of LHC in the end of 2015, and a more recent review of the project budget, the installation plan for the 11 T dipole was revised. Consequently, one 11 T dipole full assembly containing two 11 T dipoles of 5.5-m length will be installed on either side of interaction point 7. These two units shall be installed during the long shutdown 2 in years 2019-2020. After a brief reminder on the design features of the magnet, this paper describes the current status of the development activities, in particular the short model programme and the construction of the first full scale prototype at CERN. Finally, critical operations such as the reaction treatment and the coil impregnation are discussed, the quench performance tests results of the two-in-one model are reviewed and finally, the plan toward the production for the long shut down 2 is described.« less
Acquisition-Management Program
NASA Technical Reports Server (NTRS)
Avery, Don E.; Vann, A. Vernon; Jones, Richard H.; Rew, William E.
1987-01-01
NASA Acquisition Management Subsystem (AMS) program integrated NASA-wide standard automated-procurement-system program developed in 1985. Designed to provide each NASA installation with procurement data-base concept with on-line terminals for managing, tracking, reporting, and controlling contractual actions and associated procurement data. Subsystem provides control, status, and reporting for various procurement areas. Purpose of standardization is to decrease costs of procurement and operation of automatic data processing; increases procurement productivity; furnishes accurate, on-line management information and improves customer support. Written in the ADABAS NATURAL.
Fiber-optic technology for transport aircraft
NASA Astrophysics Data System (ADS)
1993-07-01
A development status evaluation is presented for fiber-optic devices that are advantageously applicable to commercial aircraft. Current developmental efforts at a major U.S. military and commercial aircraft manufacturer encompass installation techniques and data distribution practices, as well as the definition and refinement of an optical propulsion management interface system, environmental sensing systems, and component-qualification criteria. Data distribution is the most near-term implementable of fiber-optic technologies aboard commercial aircraft in the form of onboard local-area networks for intercomputer connections and passenger entertainment.
Evaluating and optimizing the NERSC workload on Knights Landing
DOE Office of Scientific and Technical Information (OSTI.GOV)
Barnes, T; Cook, B; Deslippe, J
2017-01-30
NERSC has partnered with 20 representative application teams to evaluate performance on the Xeon-Phi Knights Landing architecture and develop an application-optimization strategy for the greater NERSC workload on the recently installed Cori system. In this article, we present early case studies and summarized results from a subset of the 20 applications highlighting the impact of important architecture differences between the Xeon-Phi and traditional Xeon processors. We summarize the status of the applications and describe the greater optimization strategy that has formed.
Evaluating and Optimizing the NERSC Workload on Knights Landing
DOE Office of Scientific and Technical Information (OSTI.GOV)
Barnes, Taylor; Cook, Brandon; Doerfler, Douglas
2016-01-01
NERSC has partnered with 20 representative application teams to evaluate performance on the Xeon-Phi Knights Landing architecture and develop an application-optimization strategy for the greater NERSC workload on the recently installed Cori system. In this article, we present early case studies and summarized results from a subset of the 20 applications highlighting the impact of important architecture differences between the Xeon-Phi and traditional Xeon processors. We summarize the status of the applications and describe the greater optimization strategy that has formed.
NUCLEON Satellite Mission. Status and Plans
NASA Technical Reports Server (NTRS)
Bashindzhagyan, G.; Adams, J.; Bashindzhagyan, P.; Baranova, N.; Christl, M.; Chilingarian, A.; Chupin, I.; Derrickson, J.; Drury, L.; Egorov, N.
2003-01-01
The main objective of the NUCLEON satellite mission is direct measurements of the elemental energy spectra of high-energy (10(exp 11) - 10(exp 15) eV) cosmic rays with Kinematic Lightweight Energy Meter (KLEM) device. The design of the instrument has been corrected to increase geometry factor and improve charge resolution. The special mechanical and electronic systems have been developed for installation of the experimental apparatus in a regular Russian satellite. It is planned to launch the NUCLEON instrument in 2006.
An intelligent remote monitoring system for artificial heart.
Choi, Jaesoon; Park, Jun W; Chung, Jinhan; Min, Byoung G
2005-12-01
A web-based database system for intelligent remote monitoring of an artificial heart has been developed. It is important for patients with an artificial heart implant to be discharged from the hospital after an appropriate stabilization period for better recovery and quality of life. Reliable continuous remote monitoring systems for these patients with life support devices are gaining practical meaning. The authors have developed a remote monitoring system for this purpose that consists of a portable/desktop monitoring terminal, a database for continuous recording of patient and device status, a web-based data access system with which clinicians can access real-time patient and device status data and past history data, and an intelligent diagnosis algorithm module that noninvasively estimates blood pump output and makes automatic classification of the device status. The system has been tested with data generation emulators installed on remote sites for simulation study, and in two cases of animal experiments conducted at remote facilities. The system showed acceptable functionality and reliability. The intelligence algorithm also showed acceptable practicality in an application to animal experiment data.
Robert O. Curtis; David D. Marshall
1986-01-01
This progress report reviews the history and status of the cooperative levels-of-growing-stock study in coast Douglas-fir, begun in 1961, in Oregon, Washington, and British Columbia. It presents new analyses, including comparisons among some installations. Data now available are primarily from the site II installations, which are approaching completion of the study....
NASA Technical Reports Server (NTRS)
Lutwack, R.
1974-01-01
A technical assessment of a program to develop photovoltaic power system technology for large-scale national energy applications was made by analyzing and judging the alternative candidate photovoltaic systems and development tasks. A program plan was constructed based on achieving the 10 year objective of a program to establish the practicability of large-scale terrestrial power installations using photovoltaic conversion arrays costing less than $0.50/peak W. Guidelines for the tasks of a 5 year program were derived from a set of 5 year objectives deduced from the 10 year objective. This report indicates the need for an early emphasis on the development of the single-crystal Si photovoltaic system for commercial utilization; a production goal of 5 x 10 to the 8th power peak W/year of $0.50 cells was projected for the year 1985. The developments of other photovoltaic conversion systems were assigned to longer range development roles. The status of the technology developments and the applicability of solar arrays in particular power installations, ranging from houses to central power plants, was scheduled to be verified in a series of demonstration projects. The budget recommended for the first 5 year phase of the program is $268.5M.
Status and outlook of the CRYRING@ESR project
NASA Astrophysics Data System (ADS)
Geithner, W.; Andelkovic, Z.; Beck, D.; Bräuning, H.; Bräuning-Demian, A.; Danared, H.; Dimopoulou, C.; Engström, M.; Fedotova, S.; Gorda, O.; Herfurth, F.; Hess, R.; Källberg, A.; Kleffner, C.; Kotovskiy, N.; Kraus, I.; Lestinsky, M.; Litvinov, S.; Nolden, F.; Reiter, A.; Sieber, T.; Steck, M.; Vorobyev, G.
2017-11-01
Once operational, CRYRING@ESR will store and decelerate ions delivered by the experimental storage ring ESR at energies well below those of ESR. In addition to that, CRYRING@ESR has an electron cooler operating with an ultracold electron beam, allowing to provide cooled ion beams for precision experiments. These ions will be delivered to a broad range of experiments presently in preparation; either in-ring or extracted to a dedicated beamline for experiments. An overview and status report of the installation and commissioning of the CRYRING-@ESR storage ring for highly charged ions at the GSI Helmholtzzentrum für Schwerionenforschung is presented. The installation of this storage ring started in 2014 and was completing end of 2016, when this publication was written.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Saleh, Lydia Ilaiza, E-mail: lydiailaiza@gmail.com; Ryong, Kim Tae
The whole cycle of the decommissioning process development of repository requires the relevant bodies to have a financial system to ensure that it has sufficient funds for its whole life cycle (over periods of many decades). Therefore, the financing mechanism and management system shall respect the following status: the national position, institutional and legislative environment, technical capabilities, the waste origin, ownership, characteristics and inventories. The main objective of the studies is to focus on the cost considerations, alternative funding managements and mechanisms, technical and non-technical factors that may affect the repository life-cycle costs. As a conclusion, the outcomes of thismore » paper is to make a good recommendation and could be applied to the national planners, regulatory body, engineers, or the managers, to form a financial management plan for the decommissioning of the Nuclear Installation.« less
NASA Astrophysics Data System (ADS)
Kamanin, D. V.; Alexandrov, A. A.; Alexandrova, I. A.; Kondtatyev, N. A.; Kuznetsova, E. A.; Shvetsov, V. N.; Strekalovsky, A. O.; Strekalovsky, O. V.; Zhuchko, V. E.; Pyatkov, Yu. V.; Jacobs, N.; Malaza, V.
2015-06-01
Motivation and status of the VEGA (Velocity-Energy Guide based Array) project is presented. One armed fission fragments spectrometer with an electrostatic guide system is proposed for installation at the vertical experimental channel of the IBR-2 reactor. Scientific program aimed at investigation of new multi-body decays of actinides, shapeisomeric states in fission fragments and fission modes is reported.
Status of emerging standards for removable computer storage media and related contributions of NIST
NASA Technical Reports Server (NTRS)
Podio, Fernando L.
1992-01-01
Standards for removable computer storage media are needed so that users may reliably interchange data both within and among various computer installations. Furthermore, media interchange standards support competition in industry and prevent sole-source lock-in. NIST participates in magnetic tape and optical disk standards development through Technical Committees X3B5, Digital Magnetic Tapes, X3B11, Optical Digital Data Disk, and the Joint Technical Commission on Data Permanence. NIST also participates in other relevant national and international standards committees for removable computer storage media. Industry standards for digital magnetic tapes require the use of Standard Reference Materials (SRM's) developed and maintained by NIST. In addition, NIST has been studying care and handling procedures required for digital magnetic tapes. NIST has developed a methodology for determining the life expectancy of optical disks. NIST is developing care and handling procedures for optical digital data disks and is involved in a program to investigate error reporting capabilities of optical disk drives. This presentation reflects the status of emerging magnetic tape and optical disk standards, as well as NIST's contributions in support of these standards.
2018-01-01
Partial discharges (PD) measurement provides valuable information for the condition assessment of the insulation status of high-voltage (HV) electrical installations. During the last three decades, several PD sensors and measuring techniques have been developed to perform accurate diagnostics when PD measurements are carried out on-site and on-line. For utilities, the most attractive characteristics of on-line measurements are that once the sensors are installed in the grid, the electrical service is uninterrupted and that electrical systems are tested in real operating conditions. In medium-voltage (MV) and HV installations, one of the critical points where an insulation defect can occur is inside metal-clad switchgears (including the cable terminals connected to them). Thus, this kind of equipment is increasingly being monitored to carry out proper maintenance based on their condition. This paper presents a study concerning the application of different electromagnetic measuring techniques (compliant with IEC 62478 and IEC 60270 standards), together with the use of suitable sensors, which enable the evaluation of the insulation condition mainly in MV switchgears. The main scope is to give a general overview about appropriate types of electromagnetic measuring methods and sensors to be applied, while considering the level of detail and accuracy in the diagnosis and the particular fail-save requirements of the electrical installations where the switchgears are located. PMID:29495601
STS-114: Discovery Day 9 Mission Status Briefing
NASA Technical Reports Server (NTRS)
2005-01-01
Paul Hill, STS-114 Lead Shuttle Flight Director, Mark Ferring, STS-114 Lead ISS Flight Director and Cindy Begley, STS-114 Lead EVA Officer is shown during this 9th day of the Space Shuttle Mission to the International Space Station. Paul Hill talks about the status of the transfers of critical items to the International Space Station and transfers back from the International Space Station into the Multi-Purpose Logistics Module (MPLM). Hill also presents footage of the crew cabin blanket survey procedure. Mark Ferring talks in detail about the primary International Space Station task on the External Stowage Platform (ESP). The status of the external stowage platform installation, removal of grapple fixture, gap filler removal task, and Materials International Space Station Experiment (MISSE) 5 payload installation is discussed by Cindy Begley. She also presents footage of Steve Robinson's spacewalk before the gap filler task and during the removal of the gap filler. The Capture of ESP-2 is also presented. The presentation ends with a question and answer period from the news media
Army Hearing Program Status Report Quarter 1 Fiscal Year 2017
2017-03-27
per site reported some level of tinnitus . Tinnitus numbers should be viewed by the individual installation level and kept in context of the number of...providers. As a result, compliance with this requirement should be 100 percent. It is important to understand that the reported tinnitus numbers...are a subset of those Soldiers who received a test, not all Soldiers. Tinnitus rates can be calculated for each installation by taking the number
Feasibility Study of Economics and Performance of Solar Photovoltaics at Johnson County Landfill
DOE Office of Scientific and Technical Information (OSTI.GOV)
Salasovich, J.; Mosey, G.
2012-01-01
The U.S. Environmental Protection Agency (EPA), in accordance with the RE-Powering America's Land initiative, selected the Johnson County Landfill in Shawnee, Kansas, for a feasibility study of renewable energy production. Citizens of Shawnee, city planners, and site managers are interested in redevelopment uses for landfills in Kansas that are particularly well suited for grid-tied solar photovoltaic (PV) installation. This report assesses the Johnson County Landfill for possible grid-tied PV installations and estimates the cost, performance, and site impacts of three different PV options: crystalline silicon (fixed tilt), crystalline silicon (single-axis tracking), and thin film (fixed tilt). Each option represents amore » standalone system that can be sized to use an entire available site area. In addition, the report outlines financing options that could assist in the implementation of a system. The feasibility of PV systems installed on landfills is highly impacted by the available area for an array, solar resource, operating status, landfill cap status, distance to transmission lines, and distance to major roads. The report findings are applicable to other landfills in the surrounding area.« less
Photovoltaics and solar thermal conversion to electricity - Status and prospects
NASA Technical Reports Server (NTRS)
Alper, M. E.
1979-01-01
Photovoltaic power system technology development includes flat-plate silicon solar arrays and concentrating solar cell systems, which use silicon and other cell materials such as gallium arsenide. System designs and applications include small remote power systems ranging in size from tens of watts to tens of kilowatts, intermediate load-center applications ranging in size from tens to hundreds of kilowatts, and large central plant installations, as well as grid-connected rooftop applications. The thermal conversion program is concerned with large central power systems and small power applications.
NASA Astrophysics Data System (ADS)
Shaulov, S. B.; Besshapov, S. P.; Kabanova, N. V.; Sysoeva, T. I.; Antonov, R. A.; Anyuhina, A. M.; Bronvech, E. A.; Chernov, D. V.; Galkin, V. I.; Tkaczyk, W.; Finger, M.; Sonsky, M.
2009-12-01
The expedition carried out in March, 2008 to Lake Baikal became an important stage in the development of the SPHERE experiment. During the expedition the SPHERE-2 installation was hoisted, for the first time, on a tethered balloon, APA, to a height of 700 m over the lake surface covered with ice and snow. A series of test measurements were made. Preliminary results of the data processing are presented. The next plan of the SPHERE experiment is to begin a set of statistics for constructing the CR spectrum in the energy range 10-10 eV.
Current Status of VO Compliant Data Service in Japanese Virtual Observatory
NASA Astrophysics Data System (ADS)
Shirasaki, Y.; Komiya, Y.; Ohishi, M.; Mizumoto, Y.; Ishihara, Y.; Tsutsumi, J.; Hiyama, T.; Nakamoto, H.; Sakamoto, M.
2012-09-01
In these years, standards to build a Virtual Observatory (VO) data service have been established with the efforts in the International Virtual Observatory Alliance (IVOA). We applied these newly established standards (SSAP, TAP) to our VO service toolkit which was developed to implement earlier VO standards SIAP and (deprecated) SkyNode. The toolkit can be easily installed and provides a GUI interface to construct and manage VO service. In this paper, we describes the architecture of our toolkit and how it is used to start hosting VO service.
NASA Technical Reports Server (NTRS)
Delombard, R.
1984-01-01
A photovoltaic power system which will be installed at a remote location in Indonesia to provide power for a satellite Earth station and a classroom for video and audio teleconferences are described. The Earth station may also provide telephone service to a nearby village. The use of satellite communications for development assistance applications and the suitability of a hybrid photovoltaic engine generator power system for remote satellite Earth stations are demonstrated. The Indonesian rural satellite project is discussed and the photovoltaic power system is described.
NASA Technical Reports Server (NTRS)
Koenig, D. G.; Stoll, F.; Aoyagi, K.
1981-01-01
The status of ejector development in terms of application to V/STOL aircraft is reported in three categories: aircraft systems and ejector concepts; ejector performance including prediction techniques and experimental data base available; and, integration of the ejector with complete aircraft configurations. Available prediction techniques are reviewed and performance of three ejector designs with vertical lift capability is summarized. Applications of the 'fuselage' and 'short diffuser' ejectors to fighter aircraft are related to current and planned research programs. Recommendations are listed for effort needed to evaluate installed performance.
A faster and more reliable data acquisition system for the full performance of the SciCRT
Sasai, Y.; Matsubara, Y.; Itow, Y.; ...
2017-01-03
The SciBar Cosmic Ray Telescope (SciCRT) is a massive scintillator tracker to observe cosmic rays at a very high-altitude environment in Mexico. The fully active tracker is based on the Scintillator Bar (SciBar) detector developed as a near detector for the KEK-to-Kamioka long-baseline neutrino oscillation experiment (K2K) in Japan. Since the data acquisition (DAQ) system was developed for the accelerator experiment, we determined to develop a new robust DAQ system to optimize it to our cosmic-ray experiment needs at the top of Mt. Sierra Negra (4600 m). One of our special requirements is to achieve a 10 times faster readoutmore » rate. We started to develop a new fast readout back-end board (BEB) based on 100 Mbps SiTCP, a hardware network processor developed for DAQ systems for high energy physics experiments. Then we developed the new BEB which has a potential of 20 times faster than the current one in the case of observing neutrons. Lastly, we installed the new DAQ system including the new BEBs to a part of the SciCRT in July 2015. The system has been operating since then. In this article, we describe the development, the basic performance of the new BEB, the status after the installation in the SciCRT, and the future performance.« less
The magnetohydrodynamics coal-fired flow facility
NASA Astrophysics Data System (ADS)
1990-12-01
The purpose of this report is to provide the status of a multi-task research and development program in coal fired MHD/steam combined cycle power production (more detailed information on specific topics is presented in topical reports). Current emphasis is on developing technology for the Steam Bottoming Cycle Program. The approach being taken is to design test components that simulate the most important process variables, such as gas temperature, chemical composition, tube metal temperature, particulate loading, etc., to gain test data needed for scale-up to larger size components. This quarter, a 217 hour coal-fired long-duration test was completed as part of the Proof-of-Concept (POC) test program. The aggregate test time is now 1512 hours of a planned 2000 hours on Eastern coal. The report contains results of testing the newly installed automatic ash/seed handling system and the high pressure sootblower system. The conceptual design for the modifications to the coal processing system to permit operation with Western coal is presented. Results of analysis of superheater test module tube removed after 500 hours of coal-fired testing are summarized. The status of the environmental program is reported. Pollutant measurements from remote monitoring trailers that give the dispersion of stack emissions are presented. Results of advanced measurement systems operated by both UTSI and Mississippi State University during the POC test are summarized. Actions to prepare for the installation of a 20MW(sub t) prototype of the TRW slag rejection combustor first stage are discussed. Contract management and administrative actions completed during the quarter are included.
Simulation of the MoEDAL experiment
NASA Astrophysics Data System (ADS)
King, Matthew; MoEDAL Collaboration
2016-04-01
The MoEDAL experiment (Monopole and Exotics Detector at the LHC) is designed to directly search for magnetic monopoles and other highly ionising stable or meta-stable particles at the LHC. The MoEDAL detector comprises an array of plastic track detectors and aluminium trapping volumes around the P8 intersection region, opposite from the LHCb detector. TimePix devices are also installed for monitoring of the experiment. As MoEDAL mostly employs passive detectors the software development focusses on particle simulation, rather than digitisation or reconstruction. Here, we present the current status of the MoEDAL simulation software. Specifically, the development of a material description of the detector and simulations of monopole production and propagation at MoEDAL.
Development Status of Reusable Rocket Engine
NASA Astrophysics Data System (ADS)
Yoshida, Makoto; Takada, Satoshi; Naruo, Yoshihiro; Niu, Kenichi
A 30-kN rocket engine, a pilot engine, is being developed in Japan. Development of this pilot engine has been initiated in relation to a reusable sounding rocket, which is also being developed in Japan. This rocket takes off vertically, reaches an altitude of 100 km, lands vertically at the launch site, and is launched again within several days. Due to advantage of reusability, successful development of this rocket will mean that observation missions can be carried out more frequently and economically. In order to realize this rocket concept, the engines installed on the rocket should be characterized by reusability, long life, deep throttling and health monitoring, features which have not yet been established in Japanese rocket engines. To solve the engineering factors entitled by those features, a new design methodology, advanced engine simulations and engineering testing are being focused on in the pilot engine development stage. Especially in engineering testing, limit condition data is acquired to facilitate development of new diagnostic techniques, which can be applied by utilizing the mobility of small-size hardware. In this paper, the development status of the pilot engine is described, including fundamental design and engineering tests of the turbopump bearing and seal, turbine rig, injector and combustion chamber, and operation and maintenance concepts for one hundred flights by a reusable rocket are examined.
Wind Powering America Anemometer Loan Program: A Retrospective
DOE Office of Scientific and Technical Information (OSTI.GOV)
Jimenez, T.
This white paper details the history, mechanics, status, and impact of the Native American Anemometer Loan Program (ALP) conducted by the U.S. Department of Energy's Wind Powering America (WPA) initiative. Originally conceived in 2000 and terminated (as a WPA activity) at the end of FY 2011, the ALP has resulted in the installation of anemometers at 90 locations. In addition, the ALP provided support for the installation of anemometers at 38 additional locations under a related ALP administered by the Western Area Power Administration.
Integrated dynamic landscape analysis and modeling system (IDLAMS) : installation manual.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Li, Z.; Majerus, K. A.; Sundell, R. C.
The Integrated Dynamic Landscape Analysis and Modeling System (IDLAMS) is a prototype, integrated land management technology developed through a joint effort between Argonne National Laboratory (ANL) and the US Army Corps of Engineers Construction Engineering Research Laboratories (USACERL). Dr. Ronald C. Sundell, Ms. Pamela J. Sydelko, and Ms. Kimberly A. Majerus were the principal investigators (PIs) for this project. Dr. Zhian Li was the primary software developer. Dr. Jeffrey M. Keisler, Mr. Christopher M. Klaus, and Mr. Michael C. Vogt developed the decision analysis component of this project. It was developed with funding support from the Strategic Environmental Research andmore » Development Program (SERDP), a land/environmental stewardship research program with participation from the US Department of Defense (DoD), the US Department of Energy (DOE), and the US Environmental Protection Agency (EPA). IDLAMS predicts land conditions (e.g., vegetation, wildlife habitats, and erosion status) by simulating changes in military land ecosystems for given training intensities and land management practices. It can be used by military land managers to help predict the future ecological condition for a given land use based on land management scenarios of various levels of training intensity. It also can be used as a tool to help land managers compare different land management practices and further determine a set of land management activities and prescriptions that best suit the needs of a specific military installation.« less
NASA Astrophysics Data System (ADS)
Vivas Veloso, J. A.; Christie, D. R.; Campus, P.; Bell, M.; Hoffmann, T. L.; Langlois, A.; Martysevich, P.; Demirovik, E.; Carvalho, J.; Kramer, A.
2002-11-01
The infrasound component of the International Monitoring System (IMS) for Comprehensive Nuclear-Test-Ban Treaty verification aims for global detection and localization of low-frequency sound waves originating from atmospheric nuclear explosions. The infrasound network will consist of 60 array stations, distributed as evenly as possible over the globe to assure at least two-station detection capability for 1-kton explosions at any point on earth. This network will be larger and more sensitive than any other previously operated infrasound network. As of today, 85% of the site surveys for IMS infrasound stations have been completed, 25% of the stations have been installed, and 8% of the installations have been certified and are transmitting high-quality continuous data to the International Data Center in Vienna. By the end of 2002, 20% of the infrasound network is expected to be certified and operating in post-certification mode. This presentation will discuss the current status and progress made in the site survey, installation, and certification programs for IMS infrasound stations. A review will be presented of the challenges and difficulties encountered in these programs, together with practical solutions to these problems.
Detector Control System for the AFP detector in ATLAS experiment at CERN
NASA Astrophysics Data System (ADS)
Banaś, E.; Caforio, D.; Czekierda, S.; Hajduk, Z.; Olszowska, J.; Seabra, L.; Šícho, P.
2017-10-01
The ATLAS Forward Proton (AFP) detector consists of two forward detectors located at 205 m and 217 m on either side of the ATLAS experiment. The aim is to measure the momenta and angles of diffractively scattered protons. In 2016, two detector stations on one side of the ATLAS interaction point were installed and commissioned. The detector infrastructure and necessary services were installed and are supervised by the Detector Control System (DCS), which is responsible for the coherent and safe operation of the detector. A large variety of used equipment represents a considerable challenge for the AFP DCS design. Industrial Supervisory Control and Data Acquisition (SCADA) product Siemens WinCCOA, together with the CERN Joint Control Project (JCOP) framework and standard industrial and custom developed server applications and protocols are used for reading, processing, monitoring and archiving of the detector parameters. Graphical user interfaces allow for overall detector operation and visualization of the detector status. Parameters, important for the detector safety, are used for alert generation and interlock mechanisms.
NASA Astrophysics Data System (ADS)
Bilello, J. C.
1983-11-01
The status of the construction and installation of components of the synchrotron topography station is reported as well as progress in the development of hardware for interfacing and software for interactively controlling the 13 motors which automate the facility. Research focuses on the problem of X-ray optics and on techniques for applying topography to materials science. There is colaboration with other researchers in studying the nature of brittle fracture of refractory metals and in interpreting contact in the vicinity of crack tips.
NASA Lewis Research Center photovoltaic application experiments
NASA Technical Reports Server (NTRS)
Ratajczak, A.; Bifano, W.; Martz, J.; Odonnell, P.
1978-01-01
The NASA Lewis Research Center has installed 16 geographically dispersed terrestrial photovoltaic systems as part of the DOE National Photovoltaic Program. Four additional experiments are in progress. Currently, operating systems are powering refrigerators, a highway warning sign, forest lookout towers, remote weather stations, a water chiller and insect survey traps. Experiments in progress include the world's first village power system, an air pollution monitor and seismic sensors. Under a separate activity, funded by the U.S. Agency for International Development, a PV-powered water pump and grain grinder is being prepared for an African village. System descriptions and status are included in this report.
Plot-scale field experiment of surface hydrologic processes with EOS implications
NASA Technical Reports Server (NTRS)
Laymon, Charles A.; Macari, Emir J.; Costes, Nicholas C.
1992-01-01
Plot-scale hydrologic field studies were initiated at NASA Marshall Space Flight Center to a) investigate the spatial and temporal variability of surface and subsurface hydrologic processes, particularly as affected by vegetation, and b) develop experimental techniques and associated instrumentation methodology to study hydrologic processes at increasingly large spatial scales. About 150 instruments, most of which are remotely operated, have been installed at the field site to monitor ground atmospheric conditions, precipitation, interception, soil-water status, and energy flux. This paper describes the nature of the field experiment, instrumentation and sampling rationale, and presents preliminary findings.
McCoy, Mary A; Roper, Carey; Campa, Emily; Stephens-Stidham, Shelli; Carlin, Debra K; Istre, Gregory R
2014-04-01
To assess the functionality of lithium-powered smoke alarms that had been installed through a community-based programme called Operation Installation (OI). A random sample was chosen of homes that had received smoke alarms through OI, 2, 4, 6, 8 and 10 years previously. Sampled homes were visited, and information collected included functional status of smoke alarms. For homes in the 6-, 8- and 10-year sample, smoke alarms were removed and tested for battery and alarm function. 800 homes were included in the survey results; 1884 smoke alarms had been installed through OI. The proportion of homes that had at least one functioning OI smoke alarm ranged from 91.8% for year 2 sample to 19.8% for year 10. Of the originally installed smoke alarms in year 10 sample, 45.5% had been removed and 59% (64/108) of those that were still installed were not functioning. Multivariate analysis showed that the presence of at least one working alarm in the home was associated positively with the number of smoke alarms that were originally installed and whether the original occupant was still living in the home, and negatively with the length of time since the smoke alarm was installed, and whether there was a smoker in the home. Testing of the smoke alarms revealed that most non-functioning alarms had missing or dead batteries. Less than a quarter of the originally installed smoke alarms were still present and functioning by year 10. These findings have important implications for smoke alarm installation programmes.
24 CFR 3286.413 - Recordkeeping.
Code of Federal Regulations, 2011 CFR
2011-04-01
... 24 Housing and Urban Development 5 2011-04-01 2011-04-01 false Recordkeeping. 3286.413 Section 3286.413 Housing and Urban Development Regulations Relating to Housing and Urban Development (Continued... DEVELOPMENT MANUFACTURED HOME INSTALLATION PROGRAM Installer Responsibilities of Installation in HUD...
Rep. Coble, Howard [R-NC-6
2009-10-27
House - 02/12/2010 Referred to the Subcommittee on Federal Workforce, Post Office, and the District of Columbia. (All Actions) Tracker: This bill has the status IntroducedHere are the steps for Status of Legislation:
The library system of the DFVLR: Present status, planned reorganization, user possibilities
NASA Technical Reports Server (NTRS)
Sternemann, P.
1985-01-01
This paper gives an overview of the present status, planned alterations, and the scope of users of the DFVLR library, as well as a survey of library related activities outside of the library department. Attention is given to the tasks of the DFVLR which include research, assistance in planning and carrying out projects, and the construction and operation of large test installations, showing how they relate to demands on the library.
24 CFR 3286.411 - Certifying installation.
Code of Federal Regulations, 2010 CFR
2010-04-01
... manufactured home has been installed in accordance with: (i) An installation design and instructions that have... URBAN DEVELOPMENT MANUFACTURED HOME INSTALLATION PROGRAM Installer Responsibilities of Installation in...; or (ii) An installation design and instructions that have been prepared and certified by a...
The CLAS12 torus detector magnet at Jefferson Laboratory
Luongo, Cesar; Wiseman, Mark A.; Kashy, David H.; ...
2015-12-17
The CLAS12 Torus is a toroidal superconducting magnet, part of the detector for the 12GeV accelerator upgrade at Jefferson Lab. The coils were wound/fabricated by Fermi Lab, with Jlab responsible for all other parts of the project scope, including design, integration, cryostating the individual coils, installation, cryogenics, I&C, etc. The study provides an overview of the CLAS12 Torus magnet features, and serves as a status report of its installation in the experimental hall. Completion and commissioning of the magnet is expected in 2016.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Phillips, H. Lawrence; Reece, Charles E.; Valente-Feliciano, Anne-Marie
2014-02-01
Within any thin film development program directed towards SRF accelerating structures, there is a need for an RF characterization device that can provide information about RF properties of small samples. The current installation of the RF characterization device at Jefferson Lab is Surface Impedance Characterization (SIC) system. The data acquisition environment for the system has recently been improved to allow for automated measurement, and the system has been routinely used for characterization of bulk Nb, films of Nb on Cu, MgB{sub 2}, NbTiN, Nb{sub 3}Sn films, etc. We present some of the recent results that illustrate present capabilities and limitationsmore » of the system.« less
NASA Astrophysics Data System (ADS)
Nguyen, Nga; Pham, Nguyet
2018-03-01
From the beginning of the 21st century, knowledge exchange between Poland and Vietnam in mining and geology has been focusing in technology, education and training. Since years, Polish academic and commercial partners have been developing a close collaboration with Vietnam National Coal - Mineral Industries Holding Corporation Limited. Major outcomes of the collaboration are installations and operation of mining equipments and machines in Vietnamese mining companies, and excellent training programs for graduate and post graduate students and mining staff for both countries, etc. From aspects of knowledge management in globalization, the article highlights the outstanding outcomes of knowledge exchanges between the two countries, outlines cultural and economic challenges for the exchange and proposes some improvement in the future.
24 CFR 3285.501 - Home installation manual supplements.
Code of Federal Regulations, 2014 CFR
2014-04-01
... 24 Housing and Urban Development 5 2014-04-01 2014-04-01 false Home installation manual... HOUSING AND URBAN DEVELOPMENT MODEL MANUFACTURED HOME INSTALLATION STANDARDS Optional Features § 3285.501 Home installation manual supplements. Supplemental instructions for optional equipment or features must...
24 CFR 3285.501 - Home installation manual supplements.
Code of Federal Regulations, 2013 CFR
2013-04-01
... 24 Housing and Urban Development 5 2013-04-01 2013-04-01 false Home installation manual... HOUSING AND URBAN DEVELOPMENT MODEL MANUFACTURED HOME INSTALLATION STANDARDS Optional Features § 3285.501 Home installation manual supplements. Supplemental instructions for optional equipment or features must...
24 CFR 3285.501 - Home installation manual supplements.
Code of Federal Regulations, 2010 CFR
2010-04-01
... 24 Housing and Urban Development 5 2010-04-01 2010-04-01 false Home installation manual... HOUSING AND URBAN DEVELOPMENT MODEL MANUFACTURED HOME INSTALLATION STANDARDS Optional Features § 3285.501 Home installation manual supplements. Supplemental instructions for optional equipment or features must...
24 CFR 3285.501 - Home installation manual supplements.
Code of Federal Regulations, 2011 CFR
2011-04-01
... 24 Housing and Urban Development 5 2011-04-01 2011-04-01 false Home installation manual... HOUSING AND URBAN DEVELOPMENT MODEL MANUFACTURED HOME INSTALLATION STANDARDS Optional Features § 3285.501 Home installation manual supplements. Supplemental instructions for optional equipment or features must...
24 CFR 3285.501 - Home installation manual supplements.
Code of Federal Regulations, 2012 CFR
2012-04-01
... 24 Housing and Urban Development 5 2012-04-01 2012-04-01 false Home installation manual... HOUSING AND URBAN DEVELOPMENT MODEL MANUFACTURED HOME INSTALLATION STANDARDS Optional Features § 3285.501 Home installation manual supplements. Supplemental instructions for optional equipment or features must...
The Deep Impact Network Experiment Operations Center Monitor and Control System
NASA Technical Reports Server (NTRS)
Wang, Shin-Ywan (Cindy); Torgerson, J. Leigh; Schoolcraft, Joshua; Brenman, Yan
2009-01-01
The Interplanetary Overlay Network (ION) software at JPL is an implementation of Delay/Disruption Tolerant Networking (DTN) which has been proposed as an interplanetary protocol to support space communication. The JPL Deep Impact Network (DINET) is a technology development experiment intended to increase the technical readiness of the JPL implemented ION suite. The DINET Experiment Operations Center (EOC) developed by JPL's Protocol Technology Lab (PTL) was critical in accomplishing the experiment. EOC, containing all end nodes of simulated spaces and one administrative node, exercised publish and subscribe functions for payload data among all end nodes to verify the effectiveness of data exchange over ION protocol stacks. A Monitor and Control System was created and installed on the administrative node as a multi-tiered internet-based Web application to support the Deep Impact Network Experiment by allowing monitoring and analysis of the data delivery and statistics from ION. This Monitor and Control System includes the capability of receiving protocol status messages, classifying and storing status messages into a database from the ION simulation network, and providing web interfaces for viewing the live results in addition to interactive database queries.
Wind turbines: current status, obstacles, trends and technologies
NASA Astrophysics Data System (ADS)
Konstantinidis, E. I.; Botsaris, P. N.
2016-11-01
The last decade the installation of wind farms around the world is spreading rapidly and wind energy has become a significant factor for promoting sustainable development. The scope of the present study is to indicate the present status of global wind power expansion as well as the current state of the art in the field of wind turbine technology. The RAM (reliability/availability/maintenance) section is also examined and the Levelized Cost of Energy for onshore/ offshore electricity production is presented. Negative consequences that go with the rapid expansion of wind power like accidents, environmental effects, etc. are highlighted. Especially visual impact to the landscape and noise pollution are some factors that provoke social reactions. Moreover, the complicated and long permitted process of a wind power plant, the high capital cost of the investment and the grid instability due to the intermittent nature of wind, are also significant obstacles in the development of the wind energy production. The current trends in the field of research and development of onshore and offshore wind power production are analyzed. Finally the present study is trying to achieve an estimation of where the wind industry targets for the years to come.
24 CFR 3286.111 - Installer certification of installation.
Code of Federal Regulations, 2010 CFR
2010-04-01
... manufactured home has been installed in accordance with: (i) An installation design and instructions that have... HOUSING AND URBAN DEVELOPMENT MANUFACTURED HOME INSTALLATION PROGRAM Certification of Installation in HUD...; or (ii) An installation design and instructions that have been prepared and certified by a...
Inamura, Kiyonari; Kousaka, Susumu; Yamamoto, Yuichiro; Sukenobu, Yoshiharu; Okura, Yasuhiko; Matsumura, Yasushi; Takeda, Hiroshi
2003-01-01
First, history of PACS in Japan from 1982 to 2002 has been investigated. By 2002 total of 1468 PACS units have been installed. Of these, 1174 are small-size PACS with less than four image display terminals, 203 are medium-size with 5-14 terminals, and 91 are large-size with 15 up to 1300 terminals. The main nine large-size PACS of 91 have been retrospectively investigated from 1984 for PACS experiments and from 1989 for PACS operation. Most of these nine hospitals have increased the number of PACS terminals by installing additional PACS units, instead of reinforcing the existing single PACS. The use of DICOM interfaces has increased the number of modalities connected to PACS and influenced the spreading of PACS installations in Japan. The status of HIS and RIS coupling to PACS, and the use of PACS in primary diagnosis or in image referral are discussed. Assessment of PACS is now in an early stage. Baseline studies of HIS/RIS/PACS effectiveness have been carried out to assess quantitatively the PACS merit. Second, history of PACS development in Korea is described. Very acute climbing up of filmless PACS diffusion was observed from 2000 to 2002. The reasons seem to be lack of domestic X-ray film industry, economic crisis in 1997 and PACS Reimbursement Act in health insurance in Korea. Third, the Hong Kong Wide Area Image Distribution/PACS Project is reported. It is now under phase 1 of design and partial implementation employing the latest and the highest ends of advanced technology such as failure resilience. Copyright 2002 Elsevier Science Ltd.
Smoke alarm ownership and installation: a comparison of a rural and a suburban community in Georgia.
Jones, A R; Thompson, C J; Davis, M K
2001-10-01
As part of a smoke alarm giveaway and installation program (The Get-Alarmed Campaign), a total of 454 households were surveyed in two counties in Georgia, one metropolitan and one nonmetropolitan. The targeted communities in these counties had a high prevalence of low-income and minority populations and thus were at high risk of house fire-related morbidity and mortality. The objectives of the program were to determine the prevalence of and predictors for installed, functioning smoke alarms, and to install at least one smoke alarm and/or smoke alarm batteries in 100% of participating homes in need. Characteristics associated with smoke alarm ownership included home ownership, having a higher income, and having a central heating source, factors which should be considered in targeting future intervention strategies. At onset, 159/454 households (35.0%) had no smoke alarms installed and 56/275 households with existing smoke alarms (20.4%) had none that were functional. Regardless of ownership status, a free smoke alarm was installed in the household of 93.8% of participants and new batteries were installed in existing smoke alarms for 31.7% of participants. This project illustrates the usefulness of a door-to-door campaign in increasing smoke alarm ownership in both a rural and a suburban community with a high concentration of residents at high risk of house fire-related morbidity and mortality.
Large Scale Application of Vibration Sensors for Fan Monitoring at Commercial Layer Hen Houses
Chen, Yan; Ni, Ji-Qin; Diehl, Claude A.; Heber, Albert J.; Bogan, Bill W.; Chai, Li-Long
2010-01-01
Continuously monitoring the operation of each individual fan can significantly improve the measurement quality of aerial pollutant emissions from animal buildings that have a large number of fans. To monitor the fan operation by detecting the fan vibration is a relatively new technique. A low-cost electronic vibration sensor was developed and commercialized. However, its large scale application has not yet been evaluated. This paper presents long-term performance results of this vibration sensor at two large commercial layer houses. Vibration sensors were installed on 164 fans of 130 cm diameter to continuously monitor the fan on/off status for two years. The performance of the vibration sensors was compared with fan rotational speed (FRS) sensors. The vibration sensors exhibited quick response and high sensitivity to fan operations and therefore satisfied the general requirements of air quality research. The study proved that detecting fan vibration was an effective method to monitor the on/off status of a large number of single-speed fans. The vibration sensor itself was $2 more expensive than a magnetic proximity FRS sensor but the overall cost including installation and data acquisition hardware was $77 less expensive than the FRS sensor. A total of nine vibration sensors failed during the study and the failure rate was related to the batches of product. A few sensors also exhibited unsteady sensitivity. As a new product, the quality of the sensor should be improved to make it more reliable and acceptable. PMID:22163544
STATUS OF SO2 SCRUBBING TECHNOLOGIES
The paper presents the extent of current sulfur dioxide (SO2) scrubber applications on electricity generating units in the U.S. and abroad. The technical performance of recent SO2 scrubber installations is discussed. Recently reported technical innovations to SO2 scrubbing tech...
NASA Astrophysics Data System (ADS)
Hiraki, M.; Yamada, Y.; Chavas, L. M. G.; Matsugaki, N.; Igarashi, N.; Wakatsuki, S.
2013-03-01
To achieve fully-automated and/or remote data collection in high-throughput X-ray experiments, the Structural Biology Research Centre at the Photon Factory (PF) has installed PF automated mounting system (PAM) for sample exchange robots at PF macromolecular crystallography beamlines BL-1A, BL-5A, BL-17A, AR-NW12A and AR-NE3A. We are upgrading the experimental systems, including the PAM for stable and efficient operation. To prevent human error in automated data collection, we installed a two-dimensional barcode reader for identification of the cassettes and sample pins. Because no liquid nitrogen pipeline in the PF experimental hutch is installed, the users commonly add liquid nitrogen using a small Dewar. To address this issue, an automated liquid nitrogen filling system that links a 100-liter tank to the robot Dewar has been installed on the PF macromolecular beamline. Here we describe this new implementation, as well as future prospects.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hart, William Eugene
These slides describe different strategies for installing Python software. Although I am a big fan of Python software development, robust strategies for software installation remains a challenge. This talk describes several different installation scenarios. The Good: the user has administrative privileges - Installing on Windows with an installer executable, Installing with Linux application utility, Installing a Python package from the PyPI repository, and Installing a Python package from source. The Bad: the user does not have administrative privileges - Using a virtual environment to isolate package installations, and Using an installer executable on Windows with a virtual environment. The Ugly:more » the user needs to install an extension package from source - Installing a Python extension package from source, and PyCoinInstall - Managing builds for Python extension packages. The last item referring to PyCoinInstall describes a utility being developed for the COIN-OR software, which is used within the operations research community. COIN-OR includes a variety of Python and C++ software packages, and this script uses a simple plug-in system to support the management of package builds and installation.« less
Wind turbines for electric utilities: Development status and economics
NASA Technical Reports Server (NTRS)
Ramler, J. R.; Donovan, R. M.
1979-01-01
The technology and economics of the large, horizontal-axis wind turbines currently in the Federal Wind Energy Program are presented. Wind turbine technology advancements made in the last several years are discussed. It is shown that, based on current projections of the costs of these machines when produced in quantity, they should be attractive for utility application. The cost of electricity (COE) produced at the busbar is shown to be a strong function of the mean wind speed at the installation site. The breakeven COE as a fuel saver is discussed and the COE range that would be generally attractive to utilities is indicated.
Wind turbines for electric utilities - Development status and economics
NASA Technical Reports Server (NTRS)
Ramler, J. R.; Donovan, R. M.
1979-01-01
The technology and economics of the large, horizontal-axis wind turbines currently in the Federal Wind Energy Program are presented. Wind turbine technology advancements made in the last several years are discussed. It is shown that, based on current projections of the costs of these machines when produced in quantity, they should be attractive for utility application. The cost of electricity (COE) produced at the busbar is shown to be a strong function of the mean wind speed at the installation site. The breakeven COE as a 'fuel saver' is discussed and the COE range that would be generally attractive to utilities is indicated.
The Fermi Unix Environment - Dealing with Adolescence
NASA Astrophysics Data System (ADS)
Pordes, Ruth; Nicholls, Judy; Wicks, Matt
Fermilab's Computing Division started early in the definition implemention and promulgation of a common environment for Users across the Laboratory's UNIX platforms and installations. Based on our experience over nearly five years, we discuss the status of the effort ongoing developments and needs, some analysis of where we could have done better, and identify future directions to allow us to provide better and more complete service to our customers. In particular, with the power of the new PCs making enthusiastic converts of physicists to the pc world, we are faced with the challenge of expanding the paradigm to non-UNIX platforms in a uniform and consistent way.
Latest Trends in Home Networking Technologies
NASA Astrophysics Data System (ADS)
Tsutsui, Akihiro
Broadband access service, including FTTH, is now in widespread use in Japan. More than half of the households that have broadband Internet access construct local area networks (home networks) in their homes. In addition, information appliances such as personal computers, networked audio, and visual devices and game machines are connected to home networks, and many novel service applications are provided via the Internet. However, it is still difficult to install and incorporate these devices and services because networked devices have been developed in different communities. I briefly explain the current status of information appliances and home networking technologies and services and discuss some of the problems in this and their solutions.
24 CFR 3285.2 - Manufacturer installation instructions.
Code of Federal Regulations, 2010 CFR
2010-04-01
... HOUSING AND URBAN DEVELOPMENT MODEL MANUFACTURED HOME INSTALLATION STANDARDS General § 3285.2 Manufacturer... approved installation instructions must include all topics covered in the Model Installation Standards for... installation instructions meet or exceed the Model Installation Standards for foundation support and anchoring...
24 CFR 3285.2 - Manufacturer installation instructions.
Code of Federal Regulations, 2011 CFR
2011-04-01
... HOUSING AND URBAN DEVELOPMENT MODEL MANUFACTURED HOME INSTALLATION STANDARDS General § 3285.2 Manufacturer... approved installation instructions must include all topics covered in the Model Installation Standards for... installation instructions meet or exceed the Model Installation Standards for foundation support and anchoring...
24 CFR 3285.2 - Manufacturer installation instructions.
Code of Federal Regulations, 2012 CFR
2012-04-01
... HOUSING AND URBAN DEVELOPMENT MODEL MANUFACTURED HOME INSTALLATION STANDARDS General § 3285.2 Manufacturer... approved installation instructions must include all topics covered in the Model Installation Standards for... installation instructions meet or exceed the Model Installation Standards for foundation support and anchoring...
Superconducting magnet development for tokamaks and mirrors: a technical assessment
DOE Office of Scientific and Technical Information (OSTI.GOV)
Laverick, C.; Jacobs, R. B.; Boom, R. W.
1977-11-01
The role of superconducting magnets in Magnetic Fusion Energy Research and Development is assessed from a consideration of program plans and schedules, the present status of the programs and the research and development suggestions arising from recent studies and workshops. A principal conclusion is that the large superconducting magnet systems needed for commercial magnetic fusion reactors can be constructed. However such magnets working under severe conditions, with increasingly stringent reliability, safety and cost restrictions can never be built unless experience is first gained in a number of important installations designed to prove physics and technology steps on the way tomore » commercial power demonstration. The immediate problem is to design a technology program in the absence of definite device needs and specifications, giving a priority weighting to the multiplicity of good, high quality development program suggestions when all proposals cannot be supported.« less
PIV Measurements of Full-Scale UH-60A Tip Vortices
NASA Technical Reports Server (NTRS)
Yamauchi, Gloria K.
2012-01-01
The following presentation will give a description on experiments like installation, PIV measurements, and test conditions. It will also be giving the status of data processing, as well as, preliminary results. In addition, plans and present papers will also be discussed.
Targeting Net Zero Energy at Marine Corps Base Hawaii, Kaneohe Bay: Preprint
DOE Office of Scientific and Technical Information (OSTI.GOV)
Burman, K.; Kandt, A.; Lisell, L.
2012-05-01
This paper summarizes the results of an NREL assessment of Marine Corps Base Hawaii (MCBH), Kaneohe Bay to appraise the potential of achieving net zero energy status through energy efficiency, renewable energy, and hydrogen vehicle integration. In 2008, the U.S. Department of Defense's U.S. Pacific Command partnered with the U.S. Department of Energy's (DOE's) National Renewable Energy Laboratory (NREL) to assess opportunities for increasing energy security through renewable energy and energy efficiency at Hawaii military installations. DOE selected Marine Corps Base Hawaii (MCBH), Kaneohe Bay, to receive technical support for net zero energy assessment and planning funded through the Hawaiimore » Clean Energy Initiative (HCEI). NREL performed a comprehensive assessment to appraise the potential of MCBH Kaneohe Bay to achieve net zero energy status through energy efficiency, renewable energy, and hydrogen vehicle integration. This paper summarizes the results of the assessment and provides energy recommendations. The analysis shows that MCBH Kaneohe Bay has the potential to make significant progress toward becoming a net zero installation. Wind, solar photovoltaics, solar hot water, and hydrogen production were assessed, as well as energy efficiency technologies. Deploying wind turbines is the most cost-effective energy production measure. If the identified energy projects and savings measures are implemented, the base will achieve a 96% site Btu reduction and a 99% source Btu reduction. Using excess wind and solar energy to produce hydrogen for a fleet and fuel cells could significantly reduce energy use and potentially bring MCBH Kaneohe Bay to net zero. Further analysis with an environmental impact and interconnection study will need to be completed. By achieving net zero status, the base will set an example for other military installations, provide environmental benefits, reduce costs, increase energy security, and exceed its energy goals and mandates.« less
Sugano, Hiroto; Hara, Shinsuke; Tsujioka, Tetsuo; Inoue, Tadayuki; Nakajima, Shigeyoshi; Kozaki, Takaaki; Namkamura, Hajime; Takeuchi, Kazuhide
2011-01-01
For ubiquitous health care systems which continuously monitor a person's vital signs such as electrocardiogram (ECG), body surface temperature and three-dimensional (3D) acceleration by wireless, it is important to accurately detect the occurrence of an abnormal event in the data and immediately inform a medical doctor of its detail. In this paper, we introduce a remote health care system, which is composed of a wireless vital sensor, multiple receivers and a triage engine installed in a desktop personal computer (PC). The middleware installed in the receiver, which was developed in C++, supports reliable data handling of vital data to the ethernet port. On the other hand, the human interface of the triage engine, which was developed in JAVA, shows graphics on his/her ECG data, 3D acceleration data, body surface temperature data and behavior status in the display of the desktop PC and sends an urgent e-mail containing the display data to a pre-registered medical doctor when it detects the occurrence of an abnormal event. In the triage engine, the lethal arrhythmia detection algorithm based on short time Fourier transform (STFT) analysis can achieve 100 % sensitivity and 99.99 % specificity, and the behavior recognition algorithm based on the combination of the nearest neighbor method and the Naive Bayes method can achieve more than 71 % classification accuracy.
24 CFR 3286.107 - Installation in accordance with standards.
Code of Federal Regulations, 2010 CFR
2010-04-01
... HOUSING AND URBAN DEVELOPMENT MANUFACTURED HOME INSTALLATION PROGRAM Certification of Installation in HUD... requirements. (1) For purposes of determining installer compliance, a manufactured home that is subject to the requirements of this subpart B must be installed in accordance with: (i) An installation design and...
24 CFR 3286.413 - Recordkeeping.
Code of Federal Regulations, 2010 CFR
2010-04-01
... requirements of this part; and (6) A copy of foundation designs used to install the home, if different from the... DEVELOPMENT MANUFACTURED HOME INSTALLATION PROGRAM Installer Responsibilities of Installation in HUD... the installation work and the address of the home installed; (2) A copy of the contract pursuant to...
24 CFR 3286.405 - Installation suitability.
Code of Federal Regulations, 2010 CFR
2010-04-01
... plate required by § 3280.5 of this chapter is affixed to the home, that the home is designed for the... URBAN DEVELOPMENT MANUFACTURED HOME INSTALLATION PROGRAM Installer Responsibilities of Installation in... installing a manufactured home at any site, the installer must assure that the site is suitable for...
Power System Observation by using Synchronized Phasor Measurements as a Smart Device
NASA Astrophysics Data System (ADS)
Mitani, Yasunori
Phasor Measurement Unit (PMU) is an apparatus which detects the absolute value of phase angle in sinusoidal signal. When more than two units are located distantly apart from each other, and they are synchronized with GPS signal which tells us the information on exact time, it becomes ready to get phase differences between two distant places. Thus, PMU with GPS receiver is applied to the monitoring of AC power system dynamics and usually installed at substations of transmission lines. The states of power network are uniquely determined by the active and reactive power and the magnitude and phase angle of voltage in each node. Among these values the phase angle had not been easily obtained until the scheme of time synchronism with GPS appeared. In this report, the history of GPS and PMU, and the current status of the applications in power systems in the world are presented. In Japan we are developing a power system monitoring system with PMUs installed at University's campuses with 100V outlets, which is called Campus WAMS. This report also introduces some results from the Campus WAMS briefly.
Pilot Evaluations of Runway Status Light System
NASA Technical Reports Server (NTRS)
Young, Steven D.; Wills, Robert W.; Smith, R. Marshall
1996-01-01
This study focuses on use of the Transport Systems Research Vehicle (TSRV) Simulator at the Langley Research Center to obtain pilot opinion and input on the Federal Aviation Administration's Runway Status Light System (RWSL) prior to installation in an operational airport environment. The RWSL has been designed to reduce the likelihood of runway incursions by visually alerting pilots when a runway is occupied. Demonstrations of the RWSL in the TSRV Simulator allowed pilots to evaluate the system in a realistic cockpit environment.
Status of the 4 MW WTS-4 wind turbine
NASA Technical Reports Server (NTRS)
Bussolari, R. J.
1982-01-01
The WTS-4 is a four-megawatt, horizontal-axis wind turbine presently being fabricated for the U.S. Department of Interior, Bureau of Reclamation, by United Technologies' Hamilton Standard division. This unit, called the System Verification Unit (SVU) will be installed at Medicine Bow, Wyoming, early next spring. The specifications, characteristics and features of the WTS-4 are discussed. The major components-such as rotor, nacelle and tower-are described and their status in the fabrication phase is presented.
U.S. Solar Photovoltaic System Cost Benchmark: Q1 2017
DOE Office of Scientific and Technical Information (OSTI.GOV)
Fu, Ran; Feldman, David; Margolis, Robert
This report benchmarks U.S. solar photovoltaic (PV) system installed costs as of the first quarter of 2017 (Q1 2017). We use a bottom-up methodology, accounting for all system and projectdevelopment costs incurred during the installation to model the costs for residential, commercial, and utility-scale systems. In general, we attempt to model the typical installation techniques and business operations from an installed-cost perspective. Costs are represented from the perspective of the developer/installer; thus, all hardware costs represent the price at which components are purchased by the developer/installer, not accounting for preexisting supply agreements or other contracts. Importantly, the benchmark also representsmore » the sales price paid to the installer; therefore, it includes profit in the cost of the hardware, 1 along with the profit the installer/developer receives, as a separate cost category. However, it does not include any additional net profit, such as a developer fee or price gross-up, which is common in the marketplace. We adopt this approach owing to the wide variation in developer profits in all three sectors, where project pricing is highly dependent on region and project specifics such as local retail electricity rate structures, local rebate and incentive structures, competitive environment, and overall project or deal structures. Finally, our benchmarks are national averages weighted by state installed capacities.« less
Power Supplies for High Energy Particle Accelerators
NASA Astrophysics Data System (ADS)
Dey, Pranab Kumar
2016-06-01
The on-going research and the development projects with Large Hadron Collider at CERN, Geneva, Switzerland has generated enormous enthusiasm and interest amongst all to know about the ultimate findings on `God's Particle'. This paper has made an attempt to unfold the power supply requirements and the methodology adopted to provide the stringent demand of such high energy particle accelerators during the initial stages of the search for the ultimate particles. An attempt has also been made to highlight the present status on the requirement of power supplies in some high energy accelerators with a view that, precautionary measures can be drawn during design and development from earlier experience which will be of help for the proposed third generation synchrotron to be installed in India at a huge cost.
Little Goose Dam Full Flow PIT-Tag Detection System Project Summary.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Warf, Don; Livingston, Scott
2009-04-16
In 2006, the design phase of this project was kicked off and was for the most part modeled after the Full Flow PIT installation installed at Lower Monumental Dam during winter and spring of 2006 and 2007. As the Goose Full Flow design progressed and the project started to move towards construction, issues within contracting occurred and the project was put on delay for 1 year. Starting in mid December of 2008, Harcon Inc. was awarded the contract and construction of the new Goose Full Flow PIT-tag detection system began. The purpose of this document is to summarize the installationmore » of the Little Goose Full Flow project from start to finish and to highlight the notable successes and challenges that the installation presented along with the final results and current status.« less
32 CFR 231.10 - Financial institutions on DoD installations.
Code of Federal Regulations, 2010 CFR
2010-07-01
... statutory authority that is separate from State or Federal laws that govern commercial banking. Section 265... forces agreements, other intergovernmental agreements, or host-country law. (ii) Financial services at... a geographic franchise and, where applicable, as authorized by the pertinent status of forces...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Napoli, D. R., E-mail: napoli@lnl.infn.it; Andrighetto, A.; Antonini, P.
SPES, a new accelerator facility for both the production of exotic ion beams and radio-pharmaceuticals, is presently being installed at the Laboratori Nazionali di Legnaro in Italy (LNL). The new cyclotron, which will provide high intensity proton beams for the production of the rare isotopes, has been installed and is now in the commissioning phase. We present here the status of the part of the project devoted to the production and acceleration of fission fragments created in the interaction of an intense proton beam on a production target of UCx. The expected SPES radioactive beams intensities, their quality and theirmore » maximum energies (up to 11 MeV/A for A=130) will permit to perform forefront research in nuclear structure and nuclear dynamics far from the stability valley. Another low energy section of the facility is foreseen for new and challenging research, both in the nuclear physics and in the material science frameworks.« less
Sonawane, A U; Singh, Meghraj; Sunil Kumar, J V K; Kulkarni, Arti; Shirva, V K; Pradhan, A S
2010-10-01
We conducted a radiological safety and quality assurance (QA) audit of 118 medical X-ray diagnostic machines installed in 45 major hospitals in India. The main objective of the audit was to verify compliance with the regulatory requirements stipulated by the national regulatory body. The audit mainly covered accuracy check of accelerating potential (kVp), linearity of tube current (mA station) and timer, congruence of radiation and optical field, and total filtration; in addition, we also reviewed medical X-ray diagnostic installations with reference to room layout of X-ray machines and conduct of radiological protection survey. A QA kit consisting of a kVp Test-O-Meter (ToM) (Model RAD/FLU-9001), dose Test-O-Meter (ToM) (Model 6001), ionization chamber-based radiation survey meter model Gun Monitor and other standard accessories were used for the required measurements. The important areas where there was noncompliance with the national safety code were: inaccuracy of kVp calibration (23%), lack of congruence of radiation and optical field (23%), nonlinearity of mA station (16%) and timer (9%), improper collimator/diaphragm (19.6%), faulty adjustor knob for alignment of field size (4%), nonavailability of warning light (red light) at the entrance of the X-ray room (29%), and use of mobile protective barriers without lead glass viewing window (14%). The present study on the radiological safety status of diagnostic X-ray installations may be a reasonably good representation of the situation in the country as a whole. The study contributes significantly to the improvement of radiological safety by the way of the steps already taken and by providing a vital feed back to the national regulatory body.
Palmer, Antony L; Pearson, Michael; Whittard, Paul; McHugh, Katie E; Eaton, David J
2016-12-01
To assess the status and practice of kilovoltage (kV) radiotherapy in the UK. 96% of the radiotherapy centres in the UK responded to a comprehensive survey. An analysis of the installed equipment base, patient numbers, clinical treatment sites, quality control (QC) testing and radiation dosimetry processes were undertaken. 73% of UK centres have at least one kV treatment unit, with 58 units installed across the UK. Although 35% of units are over 10 years old, 39% units have been installed in the last 5 years. Approximately 6000 patients are treated with kV units in the UK each year, the most common site (44%) being basal cell carcinoma. A benchmark of QC practice in the UK is presented, against which individual centres can compare their procedures, frequency of testing and acceptable tolerance values. We propose the use of internal "notification" and "suspension" levels for analysis. All surveyed centres were using recommended Codes of Practice for kV dosimetry in the UK; approximately the same number using in-air and in-water methodologies for medium energy, with two-thirds of all centres citing "clinical relevance" as the reason for choice of code. 64% of centres had hosted an external dosimetry audit within the last 3 years, with only one centre never being independently audited. The majority of centres use locally measured applicator factors and published backscatter factors for treatments. Monitor unit calculations are performed using software in only 36% of centres. A comprehensive review of current kV practice in the UK is presented. Advances in knowledge: Data and discussion on contemporary kV radiotherapy in the UK, with a particular focus on physics aspects.
Pearson, Michael; Whittard, Paul; McHugh, Katie E; Eaton, David J
2016-01-01
Objective: To assess the status and practice of kilovoltage (kV) radiotherapy in the UK. Methods: 96% of the radiotherapy centres in the UK responded to a comprehensive survey. An analysis of the installed equipment base, patient numbers, clinical treatment sites, quality control (QC) testing and radiation dosimetry processes were undertaken. Results: 73% of UK centres have at least one kV treatment unit, with 58 units installed across the UK. Although 35% of units are over 10 years old, 39% units have been installed in the last 5 years. Approximately 6000 patients are treated with kV units in the UK each year, the most common site (44%) being basal cell carcinoma. A benchmark of QC practice in the UK is presented, against which individual centres can compare their procedures, frequency of testing and acceptable tolerance values. We propose the use of internal “notification” and “suspension” levels for analysis. All surveyed centres were using recommended Codes of Practice for kV dosimetry in the UK; approximately the same number using in-air and in-water methodologies for medium energy, with two-thirds of all centres citing “clinical relevance” as the reason for choice of code. 64% of centres had hosted an external dosimetry audit within the last 3 years, with only one centre never being independently audited. The majority of centres use locally measured applicator factors and published backscatter factors for treatments. Monitor unit calculations are performed using software in only 36% of centres. Conclusion: A comprehensive review of current kV practice in the UK is presented. Advances in knowledge: Data and discussion on contemporary kV radiotherapy in the UK, with a particular focus on physics aspects. PMID:27730839
Status of the Transneptunian Automated Occultation Survey (TAOS II)
NASA Astrophysics Data System (ADS)
Lehner, Matthew; Wang, Shiang-Yu; Reyes-Ruiz, Mauricio; Alcock, Charles; Castro Chacón, Joel; Chen, Wen-Ping; Chu, You-Hua; Cook, Kem H.; Figueroa, Liliana; Geary, John C.; Hernandez, Benjamin; Huang, Chung-Kai; Norton, Timothy; Szentgyorgyi, Andrew; Yen, Wei-Ling; Zhang, Zhi-Wei
2017-10-01
The Transneptunian Automated Occultation Survey (TAOS II) will aim to detect occultations of stars by small (~1 km diameter) objects in the Kuiper Belt and beyond. Such events are very rare (<0.001 events per star per year) and short in duration (~200 ms), so many stars must be monitored at a high readout cadence. TAOS II will operate three 1.3 meter telescopes at the Observatorio Astronómico Nacional at San Pedro Mártir in Baja California, México. With a 2.3 square degree field of view and a high speed camera comprising CMOS imagers, the survey will monitor 10,000 stars simultaneously with all three telescopes at a readout cadence of 20 Hz. Construction of the site began in the fall of 2013 and was completed this summer. Telescope installation began in August 2017. This poster will provide an update on the status of the survey development and the schedule leading to the beginning of survey operations.
Off-the-shelf real-time monitoring of satellite constellations in a visual 3-D environment
NASA Technical Reports Server (NTRS)
Schwuttke, Ursula M.; Hervias, Felipe; Cheng, Cecilia Han; Mactutis, Anthony; Angelino, Robert
1996-01-01
The multimission spacecraft analysis system (MSAS) data monitor is a generic software product for future real-time data monitoring and analysis. The system represents the status of a satellite constellation through the shape, color, motion and position of graphical objects floating in a three dimensional virtual reality environment. It may be used for the monitoring of large volumes of data, for viewing results in configurable displays, and for providing high level and detailed views of a constellation of monitored satellites. It is considered that the data monitor is an improvement on conventional graphic and text-based displays as it increases the amount of data that the operator can absorb in a given period, and can be installed and configured without the requirement for software development by the end user. The functionality of the system is described, including: the navigation abilities; the representation of alarms in the cybergrid; limit violation; real-time trend analysis, and alarm status indication.
14 CFR 125.226 - Digital flight data recorders.
Code of Federal Regulations, 2014 CFR
2014-01-01
... this section, no person may operate under this part a turbine-engine-powered transport category... selection; (37) Drift angle (when an information source is installed); (38) Wind speed and direction (when... rudder valve status. (b) For all turbine-engine powered transport category airplanes manufactured on or...
14 CFR 125.226 - Digital flight data recorders.
Code of Federal Regulations, 2010 CFR
2010-01-01
... this section, no person may operate under this part a turbine-engine-powered transport category... selection; (37) Drift angle (when an information source is installed); (38) Wind speed and direction (when... rudder valve status. (b) For all turbine-engine powered transport category airplanes manufactured on or...
14 CFR 125.226 - Digital flight data recorders.
Code of Federal Regulations, 2013 CFR
2013-01-01
... this section, no person may operate under this part a turbine-engine-powered transport category... selection; (37) Drift angle (when an information source is installed); (38) Wind speed and direction (when... rudder valve status. (b) For all turbine-engine powered transport category airplanes manufactured on or...
14 CFR 125.226 - Digital flight data recorders.
Code of Federal Regulations, 2012 CFR
2012-01-01
... this section, no person may operate under this part a turbine-engine-powered transport category... selection; (37) Drift angle (when an information source is installed); (38) Wind speed and direction (when... rudder valve status. (b) For all turbine-engine powered transport category airplanes manufactured on or...
14 CFR 125.226 - Digital flight data recorders.
Code of Federal Regulations, 2011 CFR
2011-01-01
... this section, no person may operate under this part a turbine-engine-powered transport category... selection; (37) Drift angle (when an information source is installed); (38) Wind speed and direction (when... rudder valve status. (b) For all turbine-engine powered transport category airplanes manufactured on or...
Randomized controlled trial of ionization and photoelectric smoke alarm functionality.
Mueller, B A; Sidman, E A; Alter, H; Perkins, R; Grossman, D C
2008-04-01
To compare functionality, reasons for non-function, and nuisance alarm levels of two common types of smoke alarms after installation in low- to mid-level income households in King County, Washington. Randomized controlled trial of 761 households. An ionization or photoelectric smoke alarm was installed between June 1, 2000 and July 31, 2002. Main outcome measures were: percentage of study alarms that were working, observed reasons for non-functional status, and self-reported frequency of nuisance alarms at 9 and 15 months of follow-up. At 9 months after installation, 20% of ionization, vs 5% of photoelectric alarms were non-functional, a difference that persisted at 15 months, with the most common reasons for both types being a disconnected or absent battery. The risk ratio for ionization, relative to photoelectric alarms, being non-functional or removed was 2.7 (95% CI 1.8 to 4.1) at 15 months of follow-up. These findings were not altered by educational level, or the presence of smokers, children <5 years, or adults > or =65 years. Burn prevention efforts are geared towards increasing smoke alarm ownership and improving maintenance of functional status. Results suggest that the selective use of photoelectric alarms by fire injury prevention programs or consumers may provide longer-term protection in similar populations. Designing smoke alarms that minimize nuisance alarming may also result in longer term functionality.
24 CFR 3285.102 - Installation of manufactured homes in flood hazard areas.
Code of Federal Regulations, 2010 CFR
2010-04-01
... HOUSING COMMISSIONER, DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT MODEL MANUFACTURED HOME INSTALLATION STANDARDS Pre-Installation Considerations § 3285.102 Installation of manufactured homes in flood hazard...
24 CFR 3285.102 - Installation of manufactured homes in flood hazard areas.
Code of Federal Regulations, 2011 CFR
2011-04-01
... HOUSING COMMISSIONER, DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT MODEL MANUFACTURED HOME INSTALLATION STANDARDS Pre-Installation Considerations § 3285.102 Installation of manufactured homes in flood hazard...
24 CFR 3285.102 - Installation of manufactured homes in flood hazard areas.
Code of Federal Regulations, 2012 CFR
2012-04-01
... HOUSING COMMISSIONER, DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT MODEL MANUFACTURED HOME INSTALLATION STANDARDS Pre-Installation Considerations § 3285.102 Installation of manufactured homes in flood hazard...
NASA Technical Reports Server (NTRS)
Cook, M.
1989-01-01
The procedures, performance, and results obtained from the Thiokol Corporation/Wasatch Redesigned Field Joint Protection System (FJPS) Installation Evaluation are documented. The purpose of the evaluation was to demonstrate and develop the procedures required to install two different concepts (referred to as Concepts 1 and 3) of the redesigned FJPS. The processing capability of each configuration was then evaluated and compared. The FJPS is installed on redesigned solid rocket motors (RSRM) to protect the field joints from rain intrusion and to maintain the joint temperature sensor measurement between 85 and 122 F while the boosters are on the launch pad. The FJPS is being redesigned to reduce installation timelines at KSC and to simplify or eliminate installation processing problems related to the present design of an EPDM moisture seal/extruded cork combination. Several installation techniques were evaluated, and a preferred method of application was developed for each concept. The installations were performed with the test article in the vertical (flight) position. Comparative timelines between the two concepts were also developed. An additional evaluation of the Concept 3 configuration was performed with the test article in the horizontal position, to simulate an overhead installation on a technical evaluation motor (TEM).
NASA Astrophysics Data System (ADS)
McElroy, J. F.; Nuttall, L. J.
The solid polymer electrolyte (SPE) fuel cell represents the first fuel cell technology known to be used operationally. Current activities are mainly related to the development of a space regenerative fuel cell system for energy storage on board space stations, or other large orbiting vehicles and platforms. During 1981, a study was performed to determine the feasibility of using SPE fuel cells for automotive or other vehicular applications, using methanol as the fuel. The results of this study were very encouraging. Details concerning a conceptual automotive fuel cell power plant study are discussed, taking into account also a layout of major components for compact passenger car installation.
The Fermi Unix environment -- Dealing with adolescence
DOE Office of Scientific and Technical Information (OSTI.GOV)
Pordes, R.; Nicholls, J.; Wicks, M.
1995-10-01
Fermilab`s Computing Division started early in the definition implementation and promulgation of a common environment for Users across the Laboratory`s UNIX platforms and installations. Based on the authors experience over nearly five years, they discuss the status of the effort, ongoing developments and needs, some analysis of where they could have done better, and identify future directions to allow them to provide better and more complete service to their customers. In particular, with the power of the new PCs making enthusiastic converts of physicists to the pc world, they are faced with the challenge of expanding the paradigm to non-UNIXmore » platforms in a uniform and consistent way.« less
Status of the Superconducting Insertion Device Control at TLS
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hu, K. H.; Wang, C. J.; Lee, Demi
2007-01-19
Superconducting insertion devices are installed at Taiwan Light Source to meet the rapidly growing demand of X-ray users. A control system supports the operation of all these superconducting insertion devices. Control system coordinates the operation of the main power supply and the trimming power supply to charge/discharge the magnet and provide essential interlock protection for the coils and vacuum ducts. Quench protection and various cryogenic interlocks are designed to prevent damage to the magnet. A friendly user interface supports routine operation. Various applications are also developed to aid the operation of these insertion devices. Design consideration and details of themore » implementation will be summarized in this report.« less
Hydropower resources at risk: The status of hydropower regulation and development - 1997
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hunt, R.T.; Hunt, J.A.
This report documents today`s hydropower licensing and development status based on published data as follows: (a) Federal Energy Regulatory Commission (FERC) databases, maintained by FERC`s Office of Hydropower Licensing, of: (1) operating FERC-regulated projects, federal projects, and known unlicensed projects; (2) surrendered licenses; and, (3) recent licensing and relicensing actions; (b) Energy Information Administration (EIA) data on installed capacity and generation from 1949 through 1995 for the various resources used to produce electricity in the U.S.; and, (c) FERC licensing orders, and environmental assessments or environmental impact statements for each individual project relicensed since 1980. The analysis conducted to preparemore » this paper includes the effects of all FERC hydropower licensing actions since 1980, and applies those findings to estimate the costs of hydropower licensing and development activity for the next 15 years. It also quantifies the national cost of hydropower regulation. The future estimates are quite conservative. The are presented in 1996 dollars without speculating on the effects of future inflation, license surrenders, conditions imposed through open-ended license articles, license terms greater than 30 years, or low water years. Instead, they show the most directly predictable influences on licensing outcomes using actual experiences since ECPA (after 1986).« less
Global Positioning System (GPS): Current status and possible nursery uses
Dick Karsky
2002-01-01
The GPS (Global Positioning System) is a worldwide satellite-positioning system that was funded, installed, and continues to be operated by the U.S. Department of Defense. The navigation signals are provided free and can be used by anyone who has the equipment necessary to receive them.
40 CFR 265.221 - Design and operating requirements.
Code of Federal Regulations, 2013 CFR
2013-07-01
... effective date of a prohibition pursuant to § 268.5 of this chapter, within this 48-month period. [50 FR... (CONTINUED) INTERIM STATUS STANDARDS FOR OWNERS AND OPERATORS OF HAZARDOUS WASTE TREATMENT, STORAGE, AND... each replacement of an existing surface impoundment unit must install two or more liners, and a...
40 CFR 265.226 - Monitoring and inspection.
Code of Federal Regulations, 2012 CFR
2012-07-01
... operating level for two consecutive months, the amount of liquids in the sumps must be recorded at least... (CONTINUED) INTERIM STATUS STANDARDS FOR OWNERS AND OPERATORS OF HAZARDOUS WASTE TREATMENT, STORAGE, AND... period. (2) After the final cover is installed, the amount of liquids removed from each leak detection...
40 CFR 265.226 - Monitoring and inspection.
Code of Federal Regulations, 2010 CFR
2010-07-01
... operating level for two consecutive months, the amount of liquids in the sumps must be recorded at least... (CONTINUED) INTERIM STATUS STANDARDS FOR OWNERS AND OPERATORS OF HAZARDOUS WASTE TREATMENT, STORAGE, AND... period. (2) After the final cover is installed, the amount of liquids removed from each leak detection...
40 CFR 265.221 - Design and operating requirements.
Code of Federal Regulations, 2014 CFR
2014-07-01
... effective date of a prohibition pursuant to § 268.5 of this chapter, within this 48-month period. [50 FR... (CONTINUED) INTERIM STATUS STANDARDS FOR OWNERS AND OPERATORS OF HAZARDOUS WASTE TREATMENT, STORAGE, AND... each replacement of an existing surface impoundment unit must install two or more liners, and a...
40 CFR 265.221 - Design and operating requirements.
Code of Federal Regulations, 2010 CFR
2010-07-01
... effective date of a prohibition pursuant to § 268.5 of this chapter, within this 48-month period. [50 FR... (CONTINUED) INTERIM STATUS STANDARDS FOR OWNERS AND OPERATORS OF HAZARDOUS WASTE TREATMENT, STORAGE, AND... each replacement of an existing surface impoundment unit must install two or more liners, and a...
40 CFR 265.226 - Monitoring and inspection.
Code of Federal Regulations, 2011 CFR
2011-07-01
... operating level for two consecutive months, the amount of liquids in the sumps must be recorded at least... (CONTINUED) INTERIM STATUS STANDARDS FOR OWNERS AND OPERATORS OF HAZARDOUS WASTE TREATMENT, STORAGE, AND... period. (2) After the final cover is installed, the amount of liquids removed from each leak detection...
40 CFR 265.221 - Design and operating requirements.
Code of Federal Regulations, 2012 CFR
2012-07-01
... effective date of a prohibition pursuant to § 268.5 of this chapter, within this 48-month period. [50 FR... (CONTINUED) INTERIM STATUS STANDARDS FOR OWNERS AND OPERATORS OF HAZARDOUS WASTE TREATMENT, STORAGE, AND... each replacement of an existing surface impoundment unit must install two or more liners, and a...
40 CFR 265.226 - Monitoring and inspection.
Code of Federal Regulations, 2013 CFR
2013-07-01
... operating level for two consecutive months, the amount of liquids in the sumps must be recorded at least... (CONTINUED) INTERIM STATUS STANDARDS FOR OWNERS AND OPERATORS OF HAZARDOUS WASTE TREATMENT, STORAGE, AND... period. (2) After the final cover is installed, the amount of liquids removed from each leak detection...
40 CFR 265.221 - Design and operating requirements.
Code of Federal Regulations, 2011 CFR
2011-07-01
... effective date of a prohibition pursuant to § 268.5 of this chapter, within this 48-month period. [50 FR... (CONTINUED) INTERIM STATUS STANDARDS FOR OWNERS AND OPERATORS OF HAZARDOUS WASTE TREATMENT, STORAGE, AND... each replacement of an existing surface impoundment unit must install two or more liners, and a...
40 CFR 265.226 - Monitoring and inspection.
Code of Federal Regulations, 2014 CFR
2014-07-01
... operating level for two consecutive months, the amount of liquids in the sumps must be recorded at least... (CONTINUED) INTERIM STATUS STANDARDS FOR OWNERS AND OPERATORS OF HAZARDOUS WASTE TREATMENT, STORAGE, AND... period. (2) After the final cover is installed, the amount of liquids removed from each leak detection...
Space fabrication demonstration system
NASA Technical Reports Server (NTRS)
1978-01-01
The lower right aluminum beam cap roll forming mill was delivered and installed in the beam builder. The beam was brought to full operational status and beams of one to six bay lengths were produced to demonstrate full system capability. Although the cap flange waviness problem persists, work is progressing within cost and schedule.
Logistics hardware and services control system
NASA Technical Reports Server (NTRS)
Koromilas, A.; Miller, K.; Lamb, T.
1973-01-01
Software system permits onsite direct control of logistics operations, which include spare parts, initial installation, tool control, and repairable parts status and control, through all facets of operations. System integrates logistics actions and controls receipts, issues, loans, repairs, fabrications, and modifications and assets in predicting and allocating logistics parts and services effectively.
Continuous flow measurements using ultrasonic velocity meters - an update
Oltmann, Rick
1995-01-01
An article in the summer 1993 Newsletter described USGS work to continously monitor tidal flows in the delta using ultrasonic velocity meters. This article updates progress since 1993, including new installations, results of data analysis, damage during this year's high flows, and the status of each site.
NASA Astrophysics Data System (ADS)
Dwyer, S.; LIGO Scientific Collaboration
2015-05-01
Advanced LIGO is currently in the final stages of installation and early commissioning. In the design of Advanced LIGO a key goal was the ability to detect gravitational waves from compact object binary inspirals, as these are thought to be the most likely candidates for early detections with ground based interferometers. Special emphasis has been placed on improving the low frequency sensitivity relative to the first generations of LIGO, in addition to improving the high frequency sensitivity by increasing the laser power. The interferometer in Livingston Louisiana has been locked (continuously held within the linear operating range) and noise investigations have begun, and the major installation activities for the interferometer at Hanford, Washington are completed.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Anderson, K.; Markel, T.; Simpson, M.
The U.S. Army's Fort Carson installation was selected to serve as a prototype for net zero energy assessment and planning. NREL performed the comprehensive assessment to appraise the potential of Fort Carson to achieve net zero energy status through energy efficiency, renewable energy, and electric vehicle integration. This report summarizes the results of the assessment and provides energy recommendations. This study is part of a larger cross-laboratory effort that also includes an assessment of renewable opportunities at seven other DoD Front Range installations, a microgrid design for Fort Carson critical loads and an assessment of regulatory and market-based barriers tomore » a regional secure smart grid.« less
Endogenous opiates and behavior: 2014.
Bodnar, Richard J
2016-01-01
This paper is the thirty-seventh consecutive installment of the annual review of research concerning the endogenous opioid system. It summarizes papers published during 2014 that studied the behavioral effects of molecular, pharmacological and genetic manipulation of opioid peptides, opioid receptors, opioid agonists and opioid antagonists. The particular topics that continue to be covered include the molecular-biochemical effects and neurochemical localization studies of endogenous opioids and their receptors related to behavior (endogenous opioids and receptors), and the roles of these opioid peptides and receptors in pain and analgesia (pain and analgesia); stress and social status (human studies); tolerance and dependence (opioid mediation of other analgesic responses); learning and memory (stress and social status); eating and drinking (stress-induced analgesia); alcohol and drugs of abuse (emotional responses in opioid-mediated behaviors); sexual activity and hormones, pregnancy, development and endocrinology (opioid involvement in stress response regulation); mental illness and mood (tolerance and dependence); seizures and neurologic disorders (learning and memory); electrical-related activity and neurophysiology (opiates and conditioned place preferences (CPP)); general activity and locomotion (eating and drinking); gastrointestinal, renal and hepatic functions (alcohol and drugs of abuse); cardiovascular responses (opiates and ethanol); respiration and thermoregulation (opiates and THC); and immunological responses (opiates and stimulants). This paper is the thirty-seventh consecutive installment of the annual review of research concerning the endogenous opioid system. It summarizes papers published during 2014 that studied the behavioral effects of molecular, pharmacological and genetic manipulation of opioid peptides, opioid receptors, opioid agonists and opioid antagonists. The particular topics that continue to be covered include the molecular-biochemical effects and neurochemical localization studies of endogenous opioids and their receptors related to behavior (endogenous opioids and receptors), and the roles of these opioid peptides and receptors in pain and analgesia (pain and analgesia); stress and social status (human studies); tolerance and dependence (opioid mediation of other analgesic responses); learning and memory (stress and social status); eating and drinking (stress-induced analgesia); alcohol and drugs of abuse (emotional responses in opioid-mediated behaviors); sexual activity and hormones, pregnancy, development and endocrinology (opioid involvement in stress response regulation); mental illness and mood (tolerance and dependence); seizures and neurologic disorders (learning and memory); electrical-related activity and neurophysiology (opiates and conditioned place preferences (CPP)); general activity and locomotion (eating and drinking); gastrointestinal, renal and hepatic functions (alcohol and drugs of abuse); cardiovascular responses (opiates and ethanol); respiration and thermoregulation (opiates and THC); and immunological responses (opiates and stimulants). Copyright © 2015 Elsevier Inc. All rights reserved.
Core network infrastructure supporting the VLT at ESO Paranal in Chile
NASA Astrophysics Data System (ADS)
Reay, Harold
2000-06-01
In October 1997 a number of projects were started at ESO's Paranal Observatory at Cerro Paranal in Chile to upgrade the communications infrastructure in place at the time. The planned upgrades were to internal systems such as computer data networks and telephone installations and also data links connecting Paranal to other ESO sites. This paper details the installation work carried out on the Paranal Core Network (PCN) during the period of October 1997 to December 1999. These installations were to provide both short term solutions to the requirement for reliable high bandwidth network connectivity between Paranal and ESO HQ in Garching, Germany in time for UTI (Antu) first light and perhaps more importantly, to provide the core systems necessary for a site moving towards operational status. This paper explains the reasons for using particular cable types, network topology, and fiber backbone design and implementation. We explain why it was decided to install the PCN in two distinct stages and how equipment used in temporary installations was re-used in the Very Large Telescope networks. Finally we describe the tools used to monitor network and satellite link performance and will discuss whether network backbone bandwidth meets the expected utilization and how this bandwidth can easily be increased in the future should there be a requirement.
1984-12-01
Biochemical and Dietary Measurements 129 Table 40 - Correlations Between Biochemical and Dietary Measurements 130 Table 41 - Serum Vitamin A Levels of 29...Palms Personnel By Average Daily Vitamin A Consumption 131 Table 42 - Average Daily Vitamin A Intake of Marines By Serum Vitamin A Levels 132 xiii Z...vitamin A levels increased further to a high of 80% in the female personnel. The poor vitamin A nutritional status was reflected also in the low serum
Description and status of NASA-LeRC/DOE photovoltaic applications systems
NASA Technical Reports Server (NTRS)
Ratajczak, A. F.
1978-01-01
Designed, fabricated and installed were 16 geographically dispersed photovoltaic systems. These systems are powering a refrigerator, highway warning sign, forest lookout towers, remote weather stations, a water chiller at a visitor center, and insect survey traps. Each of these systems is described in terms of load requirements, solar array and battery size, and instrumentation and controls. Operational experience is described and present status is given for each system. The P/V power systems have proven to be highly reliable with almost no problems with modules and very few problems overall.
Current status of the expanded GRAPES collaboration experiment at Ooty in India
NASA Astrophysics Data System (ADS)
Gupta, S.K.; Anita, H.M.; Iyer, A.; Jagadeesan, P.; Jain, A.; Karthikeyan, S.; Manoharan, P.K.; Mohanty, P.K.; Nayak, P.K.; Rao, B.S.; Ravindran, K.C.; Tanaka, H.; Tonwar, S.C.; Ogio, S.; Okuda, T.; Oshima, A.; Shimizu, N.; Yoshikoshi, T.; Badruddin; Hasan, R.; Ahmad, Shakeel; Mishra, A.P.; Shrivastava, P.K.; Koul, R.; Shah, G.N.; Mir, T.A.; Mufti, S.; Raha, S.; Ghosh, S.; Joarder, P.; Saha, S.; Boruah, K.; Datta, P.; Boruah, P.K.; Baruah, A.G.; Baishya, R.; Saikia, J.; Banerjee, D.; Subramanian, P.; Bhadra, A.; Kumar, S.; Agarwal, R.; Dubey, S.K.; Bhattacharjee, P.
GRAPES-3 experiment employs a high-density array of scintillators and a large area tracking muon telescope. The GRAPES collaboration is being expanded with addition of several major facilities. These include a Cerenkov telescope and low frequency dipole array for the measurement of shower energy. Addition of several modules of muon telescopes to cover a larger area, expansion of the scintillator array with greater separation between detectors. Installation of a neutron monitor is also planned. The current status of the experiment would be summarized.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Ullal, H. S.; von Roedern, B.
2007-09-01
We report here on the major commercialization aspects of thin-film photovoltaic (PV) technologies based on CIGS and CdTe (a-Si and thin-Si are also reported for completeness on the status of thin-film PV). Worldwide silicon (Si) based PV technologies continues to dominate at more than 94% of the market share, with the share of thin-film PV at less than 6%. However, the market share for thin-film PV in the United States continues to grow rapidly over the past several years and in CY 2006, they had a substantial contribution of about 44%, compared to less than 10% in CY 2003. Inmore » CY 2007, thin-film PV market share is expected to surpass that of Si technology in the United States. Worldwide estimated projections for CY 2010 are that thin-film PV production capacity will be more than 3700 MW. A 40-MW thin-film CdTe solar field is currently being installed in Saxony, Germany, and will be completed in early CY 2009. The total project cost is Euro 130 million, which equates to an installed PV system price of Euro 3.25/-watt averaged over the entire solar project. This is the lowest price for any installed PV system in the world today. Critical research, development, and technology issues for thin-film CIGS and CdTe are also elucidated in this paper.« less
National Ignition Facility Project: An Update
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hogan, W J; Moses, E; Warner, B
2000-12-07
The National Ignition Facility (NIF) consists of 192 forty-centimeter-square laser beams and a 10-m-diameter target chamber. Physical construction began in 1997. The Laser and Target Area Building and the Optics Assembly Building were the first major construction activities, and despite several unforeseen obstacles, the buildings are now 92% complete and have been done on time and within cost. Prototype component development and testing has proceeded in parallel. Optics vendors have installed full-scale production lines and have done prototype production runs. The assembly and integration of the beampath infrastructure has been reconsidered and a new approach has been developed. This papermore » will discuss the status of the NIF project and the plans for completion. It will also include summary information on Laser MegaJoule (LMJ) provided by M. Andre, LMJ Project Director.« less
The National Ignition Facility Project: An Update
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hogan, W.J.; Moses, E.; Warner, B.
2000-12-07
The National Ignition Facility (NIT) consists of 192 forty-centimeter-square laser beams and a 10-m-diameter target chamber. Physical construction began in 1997. The Laser and Target Area Building and the Optics Assembly Building were the first major construction activities, and despite several unforeseen obstacles, the buildings are now 92% complete and have been done on time and within cost. Prototype component development and testing has proceeded in parallel. Optics vendors have installed full-scale production lines and have done prototype production runs. The assembly and integration of the beam path infrastructure has been reconsidered and a new approach has been developed. Thismore » paper will discuss the status of the NIF project and the plans for completion. It will also include summary information on Laser MegaJoule (LMJ) provided by M. Andre, LMJ Project Director.« less
24 CFR 3285.1 - Administration.
Code of Federal Regulations, 2012 CFR
2012-04-01
... DEVELOPMENT MODEL MANUFACTURED HOME INSTALLATION STANDARDS General § 3285.1 Administration. (a) Scope. These Model Installation Standards provide minimum requirements for the initial installation of new... performing a specific operation or assembly, will be deemed to comply with these Model Installation Standards...
24 CFR 3285.1 - Administration.
Code of Federal Regulations, 2011 CFR
2011-04-01
... DEVELOPMENT MODEL MANUFACTURED HOME INSTALLATION STANDARDS General § 3285.1 Administration. (a) Scope. These Model Installation Standards provide minimum requirements for the initial installation of new... performing a specific operation or assembly, will be deemed to comply with these Model Installation Standards...
The African Reference Frame (AFREF) project: a fundamental geodetic tool for Africa
NASA Astrophysics Data System (ADS)
Farah, H.
2009-04-01
AFREF has as objective the establishment and maintenance of a unified geodetic reference frame for Africa, which will support and facilitate fundamental scientific and technical projects. The installation of observation systems all over Africa will provide important data that can be used in many different scientific fields (e.g., geodynamics, meteorological). Furthermore, AFREF will create an uniform frame that will support development projects, uniform environmental and mapping programmes as well as aid in resolving current and future international boundary disputes. This reference frame will be based on the International Terrestrial Reference Frame (ITRF) and will be realised through the establishment of a network of permanent Global Navigation Satellite System (GNSS) receivers. In close collaboration with several institutional role players, AFREF is an initiative of the United Nations Economic Commission for Africa (UNECA) Committee on Development Information (CODI). A steering committee is currently responsible for the over-all management and coordination of the implementation of AFREF. Implementation of AFREF is envisaged to be at national level in collaboration with National Mapping Organizations. Furthermore, many scientific Institutions are contributing for the densification of the network. The current status of the AFREF network will be discussed in detail. Several CORS systems have been installed to support AFREF specifically. In addition, most or all of the IGS stations located in Africa will automatically qualify as AFREF core stations. Furthermore, we will show examples of interaction between specific projects and AFREF that are contributing for the development of science in Africa.
Using the Spatial Distribution of Installers to Define Solar Photovoltaic Markets
DOE Office of Scientific and Technical Information (OSTI.GOV)
O'Shaughnessy, Eric; Nemet, Gregory F.; Darghouth, Naim
2016-09-01
Solar PV market research to date has largely relied on arbitrary jurisdictional boundaries, such as counties, to study solar PV market dynamics. This paper seeks to improve solar PV market research by developing a methodology to define solar PV markets. The methodology is based on the spatial distribution of solar PV installers. An algorithm is developed and applied to a rich dataset of solar PV installations to study the outcomes of the installer-based market definitions. The installer-based approach exhibits several desirable properties. Specifically, the higher market granularity of the installer-based approach will allow future PV market research to study themore » relationship between market dynamics and pricing with more precision.« less
14 CFR 121.344 - Digital flight data recorders for transport category airplanes.
Code of Federal Regulations, 2011 CFR
2011-01-01
... as provided in paragraph (l) of this section, no person may operate under this part a turbine-engine... (when an information source is installed); (38) Wind speed and direction (when an information source is... rudder valve status. (b) For all turbine-engine powered transport category airplanes manufactured on or...
14 CFR 121.344 - Digital flight data recorders for transport category airplanes.
Code of Federal Regulations, 2014 CFR
2014-01-01
... as provided in paragraph (l) of this section, no person may operate under this part a turbine-engine... (when an information source is installed); (38) Wind speed and direction (when an information source is... rudder valve status. (b) For all turbine-engine powered transport category airplanes manufactured on or...
14 CFR 121.344 - Digital flight data recorders for transport category airplanes.
Code of Federal Regulations, 2013 CFR
2013-01-01
... as provided in paragraph (l) of this section, no person may operate under this part a turbine-engine... (when an information source is installed); (38) Wind speed and direction (when an information source is... rudder valve status. (b) For all turbine-engine powered transport category airplanes manufactured on or...
14 CFR 121.344 - Digital flight data recorders for transport category airplanes.
Code of Federal Regulations, 2010 CFR
2010-01-01
... as provided in paragraph (l) of this section, no person may operate under this part a turbine-engine... (when an information source is installed); (38) Wind speed and direction (when an information source is... rudder valve status. (b) For all turbine-engine powered transport category airplanes manufactured on or...
14 CFR 121.344 - Digital flight data recorders for transport category airplanes.
Code of Federal Regulations, 2012 CFR
2012-01-01
... as provided in paragraph (l) of this section, no person may operate under this part a turbine-engine... (when an information source is installed); (38) Wind speed and direction (when an information source is... rudder valve status. (b) For all turbine-engine powered transport category airplanes manufactured on or...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-12-20
... bladderpod. The Bureau of Reclamation has installed a system of surface and buried drains designed to... characterize genetic diversity and compare tuplashensis and douglasii under the study design. We find the peer... irrigated private lands or manmade structures (such as buildings, pavement, or other structures) and the...
Study Guide for Floorcovering [and Instructor's Key]. V&TECC Curriculum Guide.
ERIC Educational Resources Information Center
Duenk, Lester G.; And Others
Designed for use with industrial cooperative training programs, this study guide on floor covering installation presents the basic foundation knowledge which must be put to practice on the job. The guide begins with a floor covering occupational brief. Specific topics in this section include status of the occupation, working conditions, salary,…
Preparations for Physics Studies with ATLAS During the First Years of the LHC
Fabiola Gianotti
2018-04-18
I will review the status of the ATLAS detector installation and commissioning, and discuss the preparation for physics with test-beam studies, detailed simulations, and runs with cosmics. I will then show examples of physics opportunities with the first LHC data.  Â
24 CFR 3285.906 - Telephone and cable TV.
Code of Federal Regulations, 2010 CFR
2010-04-01
... URBAN DEVELOPMENT MODEL MANUFACTURED HOME INSTALLATION STANDARDS Optional Information for Manufacturer's Installation Instructions § 3285.906 Telephone and cable TV. It is recommended that the installation instructions explain that telephone and cable TV wiring should be installed in accordance with requirements of...
Status of the DRIFT-II Directional Dark Matter Detector
NASA Astrophysics Data System (ADS)
Ghag, Chamkaur
2006-10-01
DRIFT is a directional dark matter detection programme that utilises the fact that as the Earth rotates and revolves around the Sun, an annual and diurnal signal modulation could be detected as a result of relative motion between the Earth and the non-rotating WIMP halo. This would provide very strong evidience of WIMPs since such a signal could not be mimicked by background sources. DRIFT II is an array of gas filled time projection chambers (TPCs) with Multi Wire Proportional Counter (MWPC) readout. Signals from different types of events differ greatly, between nuclear and electron recoils for example, due to the amount of ionisation initially produced and recombination times. This provides phenomenal discrimination capabilities. The first module of the DRIFT-II detector was successfully installed underground at Boulby Mine, N. Yorkshire early last year and has proven very stable, collecting high quality calibration and WIMP data. Since then a second module has been installed and is also currently operational. This presentation will describe the status of the detector and will focus on the determination of neutron efficiency and gamma rejection factors.
The AlpArray Seismic Network: current status and next steps
NASA Astrophysics Data System (ADS)
Hetényi, György; Molinari, Irene; Clinton, John; Kissling, Edi
2016-04-01
The AlpArray initiative (http://www.alparray.ethz.ch) is a large-scale European collaboration to study the entire Alpine orogen at high resolution and in 3D with a large variety of geoscientific methods. The core element of the initiative is an extensive and dense broadband seismological network, the AlpArray Seismic Network (AASN), which complements the permanent seismological stations to ensure homogeneous coverage of the greater Alpine area. The some 260 temporary stations of the AlpArray Seismic Network are operated as a joint effort by a number of institutions from Austria, Bosnia-Herzegovina, Croatia, Czech Republic, France, Germany, Hungary, Italy, Slovakia and Switzerland. The first stations were installed in Spring 2015 and the full AASN is planned to be operational by early Summer 2016. In this poster we present the actual status of the deployment, the effort undertaken by the contributing groups, station performance, typical noise levels, best practices in installation as well as in data management, often encountered challenges, and planned next steps including the deployment of ocean bottom seismometers in the Ligurian Sea.
Status of the Future Circular Collider Study
NASA Astrophysics Data System (ADS)
Benedikt, Michael
2016-03-01
Following the 2013 update of the European Strategy for Particle Physics, the international Future Circular Collider (FCC) Study has been launched by CERN as host institute, to design an energy frontier hadron collider (FCC-hh) in a new 80-100 km tunnel with a centre-of-mass energy of about 100 TeV, an order of magnitude beyond the LHC's, as a long-term goal. The FCC study also includes the design of a 90-350 GeV high-luminosity lepton collider (FCC-ee) installed in the same tunnel, serving as Higgs, top and Z factory, as a potential intermediate step, as well as an electron-proton collider option (FCC-he). The physics cases for such machines will be assessed and concepts for experiments will be developed in time for the next update of the European Strategy for Particle Physics by the end of 2018. The presentation will summarize the status of machine designs and parameters and discuss the essential technical components to be developed in the frame of the FCC study. Key elements are superconducting accelerator-dipole magnets with a field of 16 T for the hadron collider and high-power, high-efficiency RF systems for the lepton collider. In addition the unprecedented beam power presents special challenges for the hadron collider for all aspects of beam handling and machine protection. First conclusions of geological investigations and implementation studies will be presented. The status of the FCC collaboration and the further planning for the study will be outlined.
Robotic technology in surgery: current status in 2008.
Murphy, Declan G; Hall, Rohan; Tong, Raymond; Goel, Rajiv; Costello, Anthony J
2008-12-01
There is increasing patient and surgeon interest in robotic-assisted surgery, particularly with the proliferation of da Vinci surgical systems (Intuitive Surgical, Sunnyvale, CA, USA) throughout the world. There is much debate over the usefulness and cost-effectiveness of these systems. The currently available robotic surgical technology is described. Published data relating to the da Vinci system are reviewed and the current status of surgical robotics within Australia and New Zealand is assessed. The first da Vinci system in Australia and New Zealand was installed in 2003. Four systems had been installed by 2006 and seven systems are currently in use. Most of these are based in private hospitals. Technical advantages of this system include 3-D vision, enhanced dexterity and improved ergonomics when compared with standard laparoscopic surgery. Most procedures currently carried out are urological, with cardiac, gynaecological and general surgeons also using this system. The number of patients undergoing robotic-assisted surgery in Australia and New Zealand has increased fivefold in the past 4 years. The most common procedure carried out is robotic-assisted laparoscopic radical prostatectomy. Published data suggest that robotic-assisted surgery is feasible and safe although the installation and recurring costs remain high. There is increasing acceptance of robotic-assisted surgery, especially for urological procedures. The da Vinci surgical system is becoming more widely available in Australia and New Zealand. Other surgical specialties will probably use this technology. Significant costs are associated with robotic technology and it is not yet widely available to public patients.
NASA Astrophysics Data System (ADS)
O'Donoghue, Darragh E.; O'Connor, James; Crause, Lisa A.; Strumpfer, Francois; Strydom, Ockert J.; Brink, Janus D.; Sass, Craig; Wiid, Eben; Atad-Ettedgui, Eli
2010-07-01
The construction of the Southern African Large Telescope (SALT) was largely completed by the end of 2005. At the beginning of 2006, it was realized that the telescope's image quality suffered from optical aberrations, chiefly a focus gradient across the focal plane, but also accompanied by astigmatism and higher order aberrations. In the previous conference in this series, a paper was presented describing the optical system engineering investigation which had been conducted to diagnose the problem. This investigation exonerated the primary mirror as the cause, as well as the science instruments, and was isolated to the interface between the telescope and a major optical sub-system, the spherical aberration corrector (SAC). This is a complex sub-system of four aspheric mirrors which corrects the spherical aberration of the 11-m primary mirror. In the last two years, a solution to this problem was developed which involved removing the SAC from the telescope, installing a modification of the SAC/telescope interface, re-aligning and testing the four SAC mirrors and re-installation on the telescope. This paper describes the plan, discusses the details and shows progress to date and the current status.
Kinetics and advanced digester design for anaerobic digestion of water hyacinth and primary sludge
DOE Office of Scientific and Technical Information (OSTI.GOV)
Chynoweth, D.P.; Dolenc, D.A.; Ghosh, S.
1982-01-01
A research program centered around a facility located at Walt Disney World (WDW) is in progress to evaluate the use of water hyacinth (WH) for secondary and tertiary wastewater treatment, to optimize growth of WH under these conditions, and to convert the resultant primary sludge (PS) and WH to methane via anaerobic digestion. This article describes the status of the biogasification component of this program, which includes baseline and advanced digestion experiments with individual feeds and blends and the design of an experimental test unit (ETU) to be installed at WDW. Experiments with several blends demonstrated that methane yields canmore » be predicted from the fractional content and methane yield of each component. The process was found to adhere to the Monod kinetic model for microbial growth, and associated kinetic parameters were developed for various feed combinations. A novel upflow digester is achieving significantly higher conversion than a stirred-tank digester. Of several pretreatment techniques used, only alkaline treatment resulted in increased biodegradability. A larger scale (4.5 m/sup 3/) experimental test unit is being designed for installation at WDW in 1982. 13 figures, 4 tables.« less
High intensity proton injector for facility of antiproton and ion research
DOE Office of Scientific and Technical Information (OSTI.GOV)
Berezov, R., E-mail: r.berezov@gsi.de; Brodhage, R.; Fils, J.
The high current ion source with the low energy beam transport (LEBT) will serve as injector into the proton LINAC to provide primary proton beam for the production of antiprotons. The pulsed ion source developed and built in CEA/Saclay operates with a frequency of 2.45 GHz based on ECR plasma production with two coils with 87.5 mT magnetic field necessary for the electron cyclotron resonance. The compact LEBT consists of two solenoids with a maximum magnetic field of 500 mT including two integrated magnetic steerers to adjust the horizontal and vertical beam positions. The total length of the compact LEBTmore » is 2.3 m and was made as short as possible to reduced emittance growth along the beam line. To measure ion beam intensity behind the pentode extraction system, between solenoids and at the end of the beam line, two current transformers and a Faraday cup are installed. To get information about the beam quality and position, the diagnostic chamber with different equipment will be installed between the two solenoids. This article reports the current status of the proton injector for the facility of antiproton and ion research.« less
An optimization model to design and manage subsurface drip irrigation system for alfalfa
NASA Astrophysics Data System (ADS)
Kandelous, M.; Kamai, T.; Vrugt, J. A.; Simunek, J.; Hanson, B.; Hopmans, J. W.
2010-12-01
Subsurface drip irrigation (SDI) is one of the most efficient and cost-effective methods for watering alfalfa plants. Lateral installation depth and distance, emitter discharge, and irrigation time and frequency of SDI, in addition to soil and climatic conditions affect alfalfa’s root water uptake and yield. Here we use a multi-objective optimization approach to find optimal SDI strategies. Our approach uses the AMALGAM evolutionary search method, in combination with the HYDRUS-2D unsaturated flow model to maximize water uptake by alfalfa’s plant roots, and minimize loss of irrigation and drainage water to the atmosphere or groundwater. We use a variety of different objective functions to analyze SDI. These criteria include the lateral installation depth and distance, the lateral discharge, irrigation duration, and irrigation frequency. Our framework includes explicit recognition of the soil moisture status during the simulation period to make sure that the top soil is dry for harvesting during the growing season. Initial results show a wide spectrum of optimized SDI strategies for different root distributions, soil textures and climate conditions. The developed tool should be useful in helping farmers optimize their irrigation strategy and design.
The SERENDIP piggyback SETI project
NASA Technical Reports Server (NTRS)
Lampton, M.; Bowyer, S.; Werthimer, D.; Donnelly, C.; Herrick, W.
1992-01-01
The SERENDIP project is an ongoing program of monitoring and processing broadband radio signals acquired by existing radio astronomy observatories. SERENDIP operates in a piggyback mode: it makes use of whatever observing plan (sequence of frequencies, sky coordinates, and polarizations) is under way at its host observatory. Moreover, the SERENDIP data acquisition system, once installed, operates autonomously. This approach makes it possible to obtain large amounts of high quality observing time in a manner that is economical and that does not adversely affect ongoing radio astronomy survey work. The SERENDIP II system has been installed at the NRAO 300-foot telescope at Green Bank, West Virginia, and has operated there for several thousand hours. In this report, we summarize our findings from these observations and describe the present status of the project. Two key elements of SERENDIP are the automated data acquisition system that uses adaptive thresholds and logs only statistically significant peaks in the real-time power spectra, and the subsequent off-line analysis programs that identify and reject a variety of interference signals. Several specific correlations have been identified that offer promise. At present, the development and testing of these interference rejection algorithms is the main thrust of our work.
The SERENDIP piggyback SETI project.
Lampton, M; Bowyer, S; Werthimer, D; Donnelly, C; Herrick, W
1992-01-01
The SERENDIP project is an ongoing program of monitoring and processing broadband radio signals acquired by existing radio astronomy observatories. SERENDIP operates in a piggyback mode: it makes use of whatever observing plan (sequence of frequencies, sky coordinates, and polarizations) is under way at its host observatory. Moreover, the SERENDIP data acquisition system, once installed, operates autonomously. This approach makes it possible to obtain large amounts of high quality observing time in a manner that is economical and that does not adversely affect ongoing radio astronomy survey work. The SERENDIP II system has been installed at the NRAO 300-foot telescope at Green Bank, West Virginia, and has operated there for several thousand hours. In this report, we summarize our findings from these observations and describe the present status of the project. Two key elements of SERENDIP are the automated data acquisition system that uses adaptive thresholds and logs only statistically significant peaks in the real-time power spectra, and the subsequent off-line analysis programs that identify and reject a variety of interference signals. Several specific correlations have been identified that offer promise. At present, the development and testing of these interference rejection algorithms is the main thrust of our work.
Evaluation of Installation Time for SMASHmount by SMASHsolar
DOE Office of Scientific and Technical Information (OSTI.GOV)
The Department of Energy SunShot Incubator program provides early-stage assistance to help startup companies cross technological barriers to commercialization while encouraging private sector investment. The SunShot Incubator program aims to shorten the time it takes for a young business or company to develop an innovative product concept and make it commercially available, which includes product prototyping, deployment, and, potentially, manufacturing. SMASHsolar was selected as an Incubator awardee to develop a simple, snap-together, module-integrated photovoltaic (PV) mounting system in attempts to dramatically reduce the time, effort and skill needed to install rooftop solar. In support of this award, the National Renewablemore » Energy Laboratory worked with SMASHsolar to develop a procedure for evaluating the installation time required for the SMASHmount system vs. widely-available rail systems. Amongst several installations, NREL measured the following installation times, subject to the qualifications and conditions described later in this report. NREL found that the SMASHsolar SMASHmount system was installed between 15% and 37% faster than tested competing systems after one or two installations of the system.« less
Development and Installation of a Continuous Water Monitoring Systems for the AEDC
1992-08-01
AEDC-TR-92-8 Development and Installation of Continuous Water Monitoring Systems for the AEDC ES Industries 701 South Route 73 Berlin, NJ 08009...Development and Installation of a Continuous Water Monitoring System for the AEDC E AUTHOR(S) Przybyciel, M., Behm, J., and Sampey, T. 7. PERFORMING...Maximum 200 words) A system to sample and analyze water from Rowland Creek at AEDC for hydrocarbon contaminants has been developed under a Small
Suharlim, Christian; Ueda, Peter; Kawachi, Ichiro; Rimm, Eric B
2016-01-01
Objective To estimate the effect of playing Pokémon GO on the number of steps taken daily up to six weeks after installation of the game. Design Cohort study using online survey data. Participants Survey participants of Amazon Mechanical Turk (n=1182) residing in the United States, aged 18 to 35 years and using iPhone 6 series smartphones. Main outcome measures Number of daily steps taken each of the four weeks before and six weeks after installation of Pokémon GO, automatically recorded in the “Health” application of the iPhone 6 series smartphones and reported by the participants. A difference in difference regression model was used to estimate the change in daily steps in players of Pokémon GO compared with non-players. Results 560 (47.4%) of the survey participants reported playing Pokémon GO and walked on average 4256 steps (SD 2697) each day in the four weeks before installation of the game. The difference in difference analysis showed that the daily average steps for Pokémon GO players during the first week of installation increased by 955 additional steps (95% confidence interval 697 to 1213), and then this increase gradually attenuated over the subsequent five weeks. By the sixth week after installation, the number of daily steps had gone back to pre-installation levels. No significant effect modification of Pokémon GO was found by sex, age, race group, bodyweight status, urbanity, or walkability of the area of residence. Conclusions Pokémon GO was associated with an increase in the daily number of steps after installation of the game. The association was, however, moderate and no longer observed after six weeks. PMID:27965211
Strategies to increase smoke alarm use in high-risk households.
Harvey, Pauline A; Aitken, Mary; Ryan, George W; Demeter, Lori A; Givens, Jeanne; Sundararaman, Ramya; Goulette, Scott
2004-10-01
A 3-year project was undertaken to evaluate two methods of promoting residential smoke alarm installation and maintenance in high risk households across the U.S. Five states (Arkansas, Maine, Maryland, Massachusetts, and North Carolina) participated. The two strategies under study were direct installation of smoke alarms and distribution of a voucher for free smoke alarms. The target population included occupants of high-risk households without working smoke alarms who were approached as part of a door-to-door canvassing program. Fire Safety education was provided to both groups. A follow up assessment conducted 6-12 months post intervention assessed the presence and functional status of smoke alarms in each of the two groups. Demographic and fire safety data were also collected at baseline and follow up for each group. 4,455 households were enrolled in the study [Installation Group: 2,206 (49.5%), Voucher Group: 2,249 (50.5%)]. Baseline characteristics of the groups within each state were comparable. Follow up data was obtained on 1,583 installation group households and 1,545 voucher group households. At follow up, 1,421 (89.8%) households in the installation group had working smoke alarms, compared with 997 (65%) households in the voucher group, Odds Ratio 4.82 (95% CI=3.97, 5.85) (p <.0001). On average, 47% of all households enrolled in the voucher group did not redeem their vouchers (range 26-63%). Direct installation of alarms by program staff resulted in working smoke alarms in 90% of households receiving the direct installation intervention. Only 65% of voucher households had functioning alarms at follow up, largely due to failure to redeem vouchers.
NASA Astrophysics Data System (ADS)
Barbosa, F.; Bessuille, J.; Chudakov, E.; Dzhygadlo, R.; Fanelli, C.; Frye, J.; Hardin, J.; Kelsey, J.; Patsyuk, M.; Schwarz, C.; Schwiening, J.; Stevens, J.; Shepherd, M.; Whitlatch, T.; Williams, M.
2017-12-01
The GlueX DIRC (Detection of Internally Reflected Cherenkov light) detector is being developed to upgrade the particle identification capabilities in the forward region of the GlueX experiment at Jefferson Lab. The GlueX DIRC will utilize four existing decommissioned BaBar DIRC bar boxes, which will be oriented to form a plane roughly 4 m away from the fixed target of the experiment. A new photon camera has been designed that is based on the SuperB FDIRC prototype. The full GlueX DIRC system will consist of two such cameras, with the first planned to be built and installed in 2017. We present the current status of the design and R&D, along with the future plans of the GlueX DIRC detector.
The new Wide-band Solar Neutrino Trigger for Super-Kamiokande
NASA Astrophysics Data System (ADS)
Carminati, Giada
Super-Kamiokande observes low energy electrons induced by the elastic scattering of 8B solar neutrinos. The transition region between vacuum and matter oscillations, with neutrino energy near 3 MeV, is still partially unexplored by any detector. Super-Kamiokande can study this intermediate regime adding a new software trigger. The Wide-band Intelligent Trigger (WIT) has been developed to simultaneously trigger and reconstruct very low energy electrons (above 2.49 kinetic MeV) with an e_ciency close to 100%. The WIT system, comprising 256-Hyperthreaded CPU cores and one 10-Gigabit Ethernet network switch, has been recently installed and integrated in the online DAQ system of SK and the complete system is currently in an advanced status of online data testing.
NASA Astrophysics Data System (ADS)
Sato, Yuki; Fukuda, Naoki; Takeda, Hiroyuki; Kameda, Daisuke; Suzuki, Hiroshi; Shimizu, Yohei; Ahn, DeukSoon; Murai, Daichi; Inabe, Naohito; Shimaoka, Takehiro; Tsubota, Masakatsu; Kaneko, Junichi H.; Chayahara, Akiyoshi; Umezawa, Hitoshi; Shikata, Shinichi; Kumagai, Hidekazu; Murakami, Hiroyuki; Sato, Hiromi; Yoshida, Koichi; Kubo, Toshiyuki
A multiple sampling ionization chamber (MUSIC) and parallel-plate avalanche counters (PPACs) were installed within the superconducting in-flight separator, named BigRIPS, at the RIKEN Nishina Center for particle identification of RI beams. The MUSIC detector showed negligible charge collection inefficiency from recombination of electrons and ions, up to a 99-kcps incidence rate for high-energy heavy ions. For the PPAC detectors, the electrical discharge durability for incident heavy ions was improved by changing the electrode material. Finally, we designed a single crystal diamond detector, which is under development for TOF measurements of high-energy heavy ions, that has a very fast response time (pulse width <1 ns).
Commissioning of the first chambers of the CMS GE1/1 muon station
NASA Astrophysics Data System (ADS)
Ressegotti, Martina; CMS Muon Group
2017-12-01
The upgrades of the LHC planned in the next years will increase the instantaneous luminosity up to 5 × 1034 cm -2 s -1 after Long Shutdown 3, a value about five times higher than the nominal one for which the CMS experiment was designed. The resulting larger rate of interactions will produce a higher pileup environment that will challenge the trigger system of the CMS experiment in its original configuration, in particular in the endcap region. As part of the upgrade program of the CMS muon endcaps, additional muon detectors based on Gas Electron Multiplier (GEM) technology will be installed, in order to be able to sustain a physics program during high-luminosity operation without performance losses. The installation of the GE1/1 station is scheduled for Long Shutdown 2 in 2019-2020 already a demonstrator composed of five superchambers has been installed during the Extended Year-End Technical Stop at the beginning of 2017. Its goal is to test the system’s operational conditions and also to demonstrate the integration of the GE1/1 chambers into the CMS online system. The status of the installation and commissioning of the GE1/1 demonstrator is presented.
Assembly and installation of the Belle II TOP detector
NASA Astrophysics Data System (ADS)
Suzuki, Kazuhito; Belle II TOP Group
2017-12-01
The Time-of-Propagation (TOP) detector is a new type of ring-imaging Cherenkov detector developed for particle identification in the barrel region of the Belle II spectrometer. In the assembly and installation, it is crucial for the detector performance to achieve precision alignment and secure gluing of the optical components as well as to mechanically support them managing the stress, attitude, optical and electrical contacts, and limited installation space. Various efforts were made to develop the procedures and jigs along with the development of the mechanical structure. Such efforts accomplished the assembly and installation in April and May 2016, respectively, without a significant incident.
Science Goal and Mission Status of JEM-GLIMS
NASA Astrophysics Data System (ADS)
Sato, M.; Ushio, T.; Morimoto, T.; Suzuki, M.; Yamazaki, A.; Masayuki, K.; Ishida, R.; Takahashi, Y.; Inan, U. S.; Hobara, Y.; Sakamoto, Y.; Yoshida, K.; Ishikawa, H.; Yoshita, K.
2009-12-01
In order to study the generation mechanism of TLEs, global occurrence rates and distributions of lightning and TLEs, and the relationship between lightning, TLEs and TGFs, we will carry out the lightning and TLE observation at Exposed Facility of Japanese Experiment Module (JEM-EF) of International Space Station (ISS). In this mission named JEM-GLIMS (Global Lightning and sprIte MeasurementS on JEM-EF) two kinds of optical instruments and two sets of radio receivers will be integrated into the Multi mission Consolidated Equipment (MCE) which is the bus system and will be installed at JEM-EF finally. The optical instruments consist of two wide FOV CMOS cameras and six wide FOV photometers, and all these optical instruments look the nadir direction. CMOS cameras named LSI (Lightning and Sprite Imager) use the STAR-250 device as a detector, which has 512x512 pixels and 25x25 um pixel size, and have 40 deg. FOV. One CMOS camera with a wide band filter (730-830 nm) mainly measures lightning emission, while another camera with a narrowband filter (766+/-6 nm) mainly measures TLE emission. Five of six photometers named as PH have 40 deg FOV and use photomultiplier tube (PMT) as a photon detector. They equip band-pass filters (150-280 nm, 316+/-5 nm, 337+/-5 nm, 392+/-5 nm, and 762+/-5 nm) for the absolute intensity measurement of the TLE emission. One of six photometers equips a wide-band filter (600-900 nm) to detect lightning occurring within 87 deg FOV. These output signals will be recorded with the sampling frequency of 20 kHz with a 12-bit resolution. One VLF receiver will observe electric field perturbations in the frequency range of 1-40 kHz. One monopole antenna with a 15 cm length will be installed along the nadir direction. Outputs signal from the VLF antenna will be digitally sampled at the VLF electronics by 16-bit resolution with a sampling frequency. There are two sets of VHF antenna, which will be installed at the bottom plate of MCE. VLF antenna will detect VHF pulses in the frequency range of 70-100 MHz and will be recorded by the VHF electronics with 8-bit resolution with 200 MHz sampling frequency. A science instrument handling unit named as SHU is also installed. The function of SHU is to control all the science instruments, to carry out the data acquisition with a trigger function, and to establish the command and telemetry interfaces. JEM-GIMS will be launched at the beginning of 2012. We have passed the preliminary design review (PDR) on July and have started the development of the pre-flight model. We will present the development status of the JEM-GLISM mission and discuss the scientific outputs derived from this mission more in detail.
Solar heating and cooling system design and development
NASA Technical Reports Server (NTRS)
1979-01-01
The design and development of marketable solar heating and cooling systems for single family and commercial applications is described. The delivery, installation, and monitoring of the prototype systems are discussed. Seven operational test sites are discussed in terms of system performance. Problems encountered with equipment and installation were usually due to lack of skills required for solar system installation.
24 CFR 3285.3 - Alterations during initial installation.
Code of Federal Regulations, 2010 CFR
2010-04-01
... HOUSING AND URBAN DEVELOPMENT MODEL MANUFACTURED HOME INSTALLATION STANDARDS General § 3285.3 Alterations... Model Installation Standards, the MHCSS (24 CFR part 3280) and the Manufactured Home Procedural and...
24 CFR 3285.3 - Alterations during initial installation.
Code of Federal Regulations, 2011 CFR
2011-04-01
... HOUSING AND URBAN DEVELOPMENT MODEL MANUFACTURED HOME INSTALLATION STANDARDS General § 3285.3 Alterations... Model Installation Standards, the MHCSS (24 CFR part 3280) and the Manufactured Home Procedural and...
24 CFR 3285.3 - Alterations during initial installation.
Code of Federal Regulations, 2012 CFR
2012-04-01
... HOUSING AND URBAN DEVELOPMENT MODEL MANUFACTURED HOME INSTALLATION STANDARDS General § 3285.3 Alterations... Model Installation Standards, the MHCSS (24 CFR part 3280) and the Manufactured Home Procedural and...
MIRAGE: system overview and status
NASA Astrophysics Data System (ADS)
Robinson, Richard M.; Oleson, Jim; Rubin, Lane; McHugh, Stephen W.
2000-07-01
Santa Barbara Infrared's (SBIR) MIRAGE (Multispectral InfraRed Animation Generation Equipment) is a state-of-the-art dynamic infrared scene projector system. Imagery from the first MIRAGE system was presented to the scene simulation community during last year's SPIE AeroSense 99 Symposium. Since that time, SBIR has delivered five MIRAGE systems. This paper will provide an overview of the MIRAGE system and discuss the current status of the MIRAGE. Included is an update of system hardware, and the current configuration. Proposed upgrades to this configuration and options will be discussed. Updates on the latest installations, applications and measured data will also be presented.
Rep. Shea-Porter, Carol [D-NH-1
2018-05-22
House - 05/22/2018 Referred to the Committee on Veterans' Affairs, and in addition to the Committee on Armed Services, for a period to be subsequently determined by the Speaker, in each case for consideration of such provisions as fall within the jurisdiction of the committee... (All Actions) Tracker: This bill has the status IntroducedHere are the steps for Status of Legislation:
Underwater Sound Levels at a Wave Energy Device Testing Facility in Falmouth Bay, UK.
Garrett, Joanne K; Witt, Matthew J; Johanning, Lars
2016-01-01
Passive acoustic monitoring devices were deployed at FaBTest in Falmouth Bay, UK, a marine renewable energy device testing facility during trials of a wave energy device. The area supports considerable commercial shipping and recreational boating along with diverse marine fauna. Noise monitoring occurred during (1) a baseline period, (2) installation activity, (3) the device in situ with inactive power status, and (4) the device in situ with active power status. This paper discusses the preliminary findings of the sound recording at FabTest during these different activity periods of a wave energy device trial.
24 CFR 3286.103 - DAPIA-approved installation instructions.
Code of Federal Regulations, 2010 CFR
2010-04-01
... instructions for the home. (2) If the installation requires a design that is different from that provided by... HOUSING AND URBAN DEVELOPMENT MANUFACTURED HOME INSTALLATION PROGRAM Certification of Installation in HUD... purchaser or lessee. (1) For each manufactured home sold or leased to a purchaser or lessee, the retailer...
Software Management Environment (SME) installation guide
NASA Technical Reports Server (NTRS)
Kistler, David; Jeletic, Kellyann
1992-01-01
This document contains installation information for the Software Management Environment (SME), developed for the Systems Development Branch (Code 552) of the Flight Dynamics Division of Goddard Space Flight Center (GSFC). The SME provides an integrated set of management tools that can be used by software development managers in their day-to-day management and planning activities. This document provides a list of hardware and software requirements as well as detailed installation instructions and trouble-shooting information.
Status of the SAGA Light Source
DOE Office of Scientific and Technical Information (OSTI.GOV)
Kaneyasu, T.; Takabayashi, Y.; Iwasaki, Y.
The SAGA Light Source (SAGA-LS) is a synchrotron radiation facility consisting of a 255 MeV injector linac and a 1.4 GeV storage ring that is 75.6 m in circumference. The SAGA-LS has been stably providing synchrotron radiation to users since it first started user operation in February 2006. Along with the user operation, various machine improvements have been made over the past years, including upgrading the injector linac control system, replacing a septum magnet and constructing a beam diagnostic system. In addition to these improvements, insertion devices have been developed and installed. An APPLE-II type variable polarization undulator was installedmore » in 2008. To address the demand from users for high-flux hard x-rays, a superconducting 4 T class wiggler is being developed. An experimental setup for generating MeV photons by laser Compton scattering is being constructed for beam monitoring and future user experiments.« less
NASA Technical Reports Server (NTRS)
Kassak, John E.
1991-01-01
The objective of the operational television (OTV) technology was to develop a multiple camera system (up to 256 cameras) for NASA Kennedy installations where camera video, synchronization, control, and status data are transmitted bidirectionally via a single fiber cable at distances in excess of five miles. It is shown that the benefits (such as improved video performance, immunity from electromagnetic interference and radio frequency interference, elimination of repeater stations, and more system configuration flexibility) can be realized if application of the proven fiber optic transmission concept is used. The control system will marry the lens, pan and tilt, and camera control functions into a modular based Local Area Network (LAN) control network. Such a system does not exist commercially at present since the Television Broadcast Industry's current practice is to divorce the positional controls from the camera control system. The application software developed for this system will have direct applicability to similar systems in industry using LAN based control systems.
Wind shear predictive detector technology study status
NASA Technical Reports Server (NTRS)
Gandolfi, C.
1990-01-01
Among the different elements to be investigated when considering the Wind Shear hazard, the Aeronautical Navigation Technical Service (STNA/3E), whose task is to participate in the development of new technologies and equipments, focused its effort on airborne and ground sensors for the detection of low-level wind shear. The first task, initiated in 1986, consists in the evaluation of three candidate techniques for forward-looking sensors: lidar, sodar, and radar. No development is presently foreseen for an infrared based air turbulence advance warning system although some flight experiments took place in the 70's. A Thomson infrared radiometer was then installed on an Air France Boeing 707 to evaluate its capability of detecting clear air turbulence. The conclusion showed that this technique was apparently able to detect cloud layers but that additional experiments were needed; on the other hand, the rarity of the phenomenon and the difficulty in operating on a commercial aircraft were also mentioned.
24 CFR 3286.308 - Training curriculum.
Code of Federal Regulations, 2011 CFR
2011-04-01
... 24 Housing and Urban Development 5 2011-04-01 2011-04-01 false Training curriculum. 3286.308 Section 3286.308 Housing and Urban Development Regulations Relating to Housing and Urban Development... URBAN DEVELOPMENT MANUFACTURED HOME INSTALLATION PROGRAM Training of Installers in HUD-Administered...
24 CFR 3286.308 - Training curriculum.
Code of Federal Regulations, 2010 CFR
2010-04-01
... 24 Housing and Urban Development 5 2010-04-01 2010-04-01 false Training curriculum. 3286.308 Section 3286.308 Housing and Urban Development Regulations Relating to Housing and Urban Development... URBAN DEVELOPMENT MANUFACTURED HOME INSTALLATION PROGRAM Training of Installers in HUD-Administered...
The “NetBoard”: Network Monitoring Tools Integration for INFN Tier-1 Data Center
NASA Astrophysics Data System (ADS)
De Girolamo, D.; dell'Agnello and, L.; Zani, S.
2012-12-01
The monitoring and alert system is fundamental for the management and the operation of the network in a large data center such as an LHC Tier-1. The network of the INFN Tier-1 at CNAF is a multi-vendor environment: for its management and monitoring several tools have been adopted and different sensors have been developed. In this paper, after an overview on the different aspects to be monitored and the tools used for them (i.e. MRTG, Nagios, Arpwatch, NetFlow, Syslog, etc), we will describe the “NetBoard”, a monitoring toolkit developed at the INFN Tier-1. NetBoard, developed for a multi-vendor network, is able to install and auto-configure all tools needed for its monitoring, either via network devices discovery mechanism or via configuration file or via wizard. In this way, we are also able to activate different types of sensors and Nagios checks according to the equipment vendor specifications. Moreover, when a new device is connected in the LAN, NetBoard can detect where it is plugged. Finally the NetBoard web interface allows to have the overall status of the entire network “at a glance”, both the local and the geographical (including the LHCOPN and the LHCONE) link utilization, health status of network devices (with active alerts) and flow analysis.
Automated installation methods for photovoltaic arrays
NASA Astrophysics Data System (ADS)
Briggs, R.; Daniels, A.; Greenaway, R.; Oster, J., Jr.; Racki, D.; Stoeltzing, R.
1982-11-01
Since installation expenses constitute a substantial portion of the cost of a large photovoltaic power system, methods for reduction of these costs were investigated. The installation of the photovoltaic arrays includes all areas, starting with site preparation (i.e., trenching, wiring, drainage, foundation installation, lightning protection, grounding and installation of the panel) and concluding with the termination of the bus at the power conditioner building. To identify the optimum combination of standard installation procedures and automated/mechanized techniques, the installation process was investigated including the equipment and hardware available, the photovoltaic array structure systems and interfaces, and the array field and site characteristics. Preliminary designs of hardware for both the standard installation method, the automated/mechanized method, and a mix of standard installation procedures and mechanized procedures were identified to determine which process effectively reduced installation costs. In addition, costs associated with each type of installation method and with the design, development and fabrication of new installation hardware were generated.
Grover Cleveland School, Boston, Massachusetts. Refurbishment and Status Report.
ERIC Educational Resources Information Center
General Electric Co., Philadelphia, PA.
The solar heating system is a retrofit installation on the roof of the Grover Cleveland Middle School in Boston. The system includes 4,600 square feet of flat plate collectors, a 2,000 gallon solar energy storage tank, plus the required structural steel, piping, insulation, pumps, heat exchangers, and controls to heat the air supplied by two…
Status of the Negative Ion Based Heating and Diagnostic Neutral Beams for ITER
NASA Astrophysics Data System (ADS)
Schunke, B.; Bora, D.; Hemsworth, R.; Tanga, A.
2009-03-01
The current baseline of ITER foresees 2 Heating Neutral Beam (HNB's) systems based on negative ion technology, each accelerating to 1 MeV 40 A of D- and capable of delivering 16.5 MW of D0 to the ITER plasma, with a 3rd HNB injector foreseen as an upgrade option [1]. In addition a dedicated Diagnostic Neutral Beam (DNB) accelerating 60 A of H- to 100 keV will inject ≈15 A equivalent of H0 for charge exchange recombination spectroscopy and other diagnostics. Recently the RF driven negative ion source developed by IPP Garching has replaced the filamented ion source as the reference ITER design. The RF source developed at IPP, which is approximately a quarter scale of the source needed for ITER, is expected to have reduced caesium consumption compared to the filamented arc driven ion source. The RF driven source has demonstrated adequate accelerated D- and H- current densities as well as long-pulse operation [2, 3]. It is foreseen that the HNB's and the DNB will use the same negative ion source. Experiments with a half ITER-size ion source are on-going at IPP and the operation of a full-scale ion source will be demonstrated, at full power and pulse length, in the dedicated Ion Source Test Bed (ISTF), which will be part of the Neutral Beam Test Facility (NBTF), in Padua, Italy. This facility will carry out the necessary R&D for the HNB's for ITER and demonstrate operation of the full-scale HNB beamline. An overview of the current status of the neutral beam (NB) systems and the chosen configuration will be given and the ongoing integration effort into the ITER plant will be highlighted. It will be demonstrated how installation and maintenance logistics have influenced the design, notably the top access scheme facilitating access for maintenance and installation. The impact of the ITER Design Review and recent design change requests (DCRs) will be briefly discussed, including start-up and commissioning issues. The low current hydrogen phase now envisaged for start-up imposed specific requirements for operating the HNB's at full beam power. It has been decided to address the shinethrough issue by installing wall armour protection, which increases the operational space in all scenarios. Other NB related issues identified by the Design Review process will be discussed and the possible changes to the ITER baseline indicated.
Status of the Negative Ion Based Heating and Diagnostic Neutral Beams for ITER
DOE Office of Scientific and Technical Information (OSTI.GOV)
Schunke, B.; Bora, D.; Hemsworth, R.
2009-03-12
The current baseline of ITER foresees 2 Heating Neutral Beam (HNB's) systems based on negative ion technology, each accelerating to 1 MeV 40 A of D{sup -} and capable of delivering 16.5 MW of D{sup 0} to the ITER plasma, with a 3rd HNB injector foreseen as an upgrade option. In addition a dedicated Diagnostic Neutral Beam (DNB) accelerating 60 A of H{sup -} to 100 keV will inject {approx_equal}15 A equivalent of H{sup 0} for charge exchange recombination spectroscopy and other diagnostics. Recently the RF driven negative ion source developed by IPP Garching has replaced the filamented ion sourcemore » as the reference ITER design. The RF source developed at IPP, which is approximately a quarter scale of the source needed for ITER, is expected to have reduced caesium consumption compared to the filamented arc driven ion source. The RF driven source has demonstrated adequate accelerated D{sup -} and H{sup -} current densities as well as long-pulse operation. It is foreseen that the HNB's and the DNB will use the same negative ion source. Experiments with a half ITER-size ion source are on-going at IPP and the operation of a full-scale ion source will be demonstrated, at full power and pulse length, in the dedicated Ion Source Test Bed (ISTF), which will be part of the Neutral Beam Test Facility (NBTF), in Padua, Italy. This facility will carry out the necessary R and D for the HNB's for ITER and demonstrate operation of the full-scale HNB beamline. An overview of the current status of the neutral beam (NB) systems and the chosen configuration will be given and the ongoing integration effort into the ITER plant will be highlighted. It will be demonstrated how installation and maintenance logistics have influenced the design, notably the top access scheme facilitating access for maintenance and installation. The impact of the ITER Design Review and recent design change requests (DCRs) will be briefly discussed, including start-up and commissioning issues. The low current hydrogen phase now envisaged for start-up imposed specific requirements for operating the HNB's at full beam power. It has been decided to address the shinethrough issue by installing wall armour protection, which increases the operational space in all scenarios. Other NB related issues identified by the Design Review process will be discussed and the possible changes to the ITER baseline indicated.« less
Cha, Hyun-Suk; Kim, Andrew; Nowzari, Hessam; Chang, Hoo-Sun; Ahn, Kang-Min
2014-06-01
If less than 4 mm of residual bone is remained in posterior maxilla, two-stage operation is recommended for implant installation. However, if primary stability could be obtained using tapered designed implants, one-stage surgery could be performed with reliable success rate in severely resorbed maxilla. The purpose of this prospective study was to evaluate survival and success rates of the implants simultaneously placed into grafted sinus using rough-surfaced implant. A total of two hundred seventeen consecutive sinus lifting through lateral approach and four hundred sixty-two simultaneous implants were installed from November 2003 for 5.5 years. Xenogenic bone was used solely for bone graft materials. Second surgery was performed around 6 months after operation and porcelain fused metal or gold crown was used for definitive restorations. Cumulative survival and success rates were evaluated according to residual alveolar bone height (RABH), smoking status, and Schneiderian membrane perforation. The mean follow-up was 57.1 ± 15.6 (36-98) months. Of the four hundred sixty-two implants, two hundred sixty-two implants (56.7%: group 1) were installed in posterior maxilla less than 4-mm RABH and two hundred implants (43.3%: group 2) were placed in over 5-mm RABH. The cumulative survival and success rates were 98.91% and 96.54%. There was no statistically significant difference in success rate between group 1 and group 2 (p = .3135). Perforation of the membrane was not related to success (p = .7162), but smoking status is significantly related with implant failure (p = .0003). Sinus lifting with simultaneous implant placement could be used to treat atrophic maxilla in patients with minimal RABH when initial stability could be obtained by using taper designed implants with surgical techniques. Smoking is a possible factor for implant failure. Membrane perforation did not have an adverse effect on implant success if the membrane was repaired with absorbable membrane and fibrin glue. © 2012 Wiley Periodicals, Inc.
NASA Astrophysics Data System (ADS)
De Salvo, A.; Kataoka, M.; Sanchez Pineda, A.; Smirnov, Y.
2015-12-01
The ATLAS Installation System v2 is the evolution of the original system, used since 2003. The original tool has been completely re-designed in terms of database backend and components, adding support for submission to multiple backends, including the original Workload Management Service (WMS) and the new PanDA modules. The database engine has been changed from plain MySQL to Galera/Percona and the table structure has been optimized to allow a full High-Availability (HA) solution over Wide Area Network. The servlets, running on each frontend, have been also decoupled from local settings, to allow an easy scalability of the system, including the possibility of an HA system with multiple sites. The clients can also be run in multiple copies and in different geographical locations, and take care of sending the installation and validation jobs to the target Grid or Cloud sites. Moreover, the Installation Database is used as source of parameters by the automatic agents running in CVMFS, in order to install the software and distribute it to the sites. The system is in production for ATLAS since 2013, having as main sites in HA the INFN Roma Tier 2 and the CERN Agile Infrastructure. The Light Job Submission Framework for Installation (LJSFi) v2 engine is directly interfacing with PanDA for the Job Management, the Atlas Grid Information System (AGIS) for the site parameter configurations, and CVMFS for both core components and the installation of the software itself. LJSFi2 is also able to use other plugins, and is essentially Virtual Organization (VO) agnostic, so can be directly used and extended to cope with the requirements of any Grid or Cloud enabled VO. In this work we will present the architecture, performance, status and possible evolutions to the system for the LHC Run2 and beyond.
Performance of buried pipe installation.
DOT National Transportation Integrated Search
2010-05-01
The purpose of this study is to determine the effects of geometric and mechanical parameters : characterizing the soil structure interaction developed in a buried pipe installation located under : roads/highways. The drainage pipes or culverts instal...
Design and installation package for a solar powered pump
NASA Technical Reports Server (NTRS)
1978-01-01
The design and installation procedures of a solar powered pump developed by Calmac Manufacturing Company are presented. Subsystem installation, operation and maintenance requirements, subsystem performance specifications, and detailed design drawings are included.
NASA Technical Reports Server (NTRS)
Miley, S. J.; Cross, E. J., Jr.; Owens, J. K.; Lawrence, D. L.
1981-01-01
A flight-test based research program was performed to investigate the aerodynamics and cooling of a horizontally-opposed engine installation. Specific areas investigated were the internal aerodynamics and cooling mechanics of the installation, inlet aerodynamics, and exit aerodynamics. The applicable theory and current state of the art are discussed for each area. Flight-test and ground-test techniques for the development of the cooling installation and the solution of cooling problems are presented. The results show that much of the internal aerodynamics and cooling technology developed for radial engines are applicable to horizontally opposed engines. Correlation is established between engine manufacturer's cooling design data and flight measurements of the particular installation. Also, a flight-test method for the development of cooling requirements in terms of easily measurable parameters is presented. The impact of inlet and exit design on cooling and cooling drag is shown to be of major significance.
A rule-based system for real-time analysis of control systems
NASA Astrophysics Data System (ADS)
Larson, Richard R.; Millard, D. Edward
1992-10-01
An approach to automate the real-time analysis of flight critical health monitoring and system status is being developed and evaluated at the NASA Dryden Flight Research Facility. A software package was developed in-house and installed as part of the extended aircraft interrogation and display system. This design features a knowledge-base structure in the form of rules to formulate interpretation and decision logic of real-time data. This technique has been applied for ground verification and validation testing and flight testing monitoring where quick, real-time, safety-of-flight decisions can be very critical. In many cases post processing and manual analysis of flight system data are not required. The processing is described of real-time data for analysis along with the output format which features a message stack display. The development, construction, and testing of the rule-driven knowledge base, along with an application using the X-31A flight test program, are presented.
A rule-based system for real-time analysis of control systems
NASA Technical Reports Server (NTRS)
Larson, Richard R.; Millard, D. Edward
1992-01-01
An approach to automate the real-time analysis of flight critical health monitoring and system status is being developed and evaluated at the NASA Dryden Flight Research Facility. A software package was developed in-house and installed as part of the extended aircraft interrogation and display system. This design features a knowledge-base structure in the form of rules to formulate interpretation and decision logic of real-time data. This technique has been applied for ground verification and validation testing and flight testing monitoring where quick, real-time, safety-of-flight decisions can be very critical. In many cases post processing and manual analysis of flight system data are not required. The processing is described of real-time data for analysis along with the output format which features a message stack display. The development, construction, and testing of the rule-driven knowledge base, along with an application using the X-31A flight test program, are presented.
Performance evaluation of buried pipe installation.
DOT National Transportation Integrated Search
2010-05-01
The purpose of this study is to determine the effects of geometric and mechanical parameters characterizing the soil structure interaction developed in a buried pipe installation located under roads/highways. The drainage pipes or culverts installed ...
Blind-Anchor-Nut-Installation Fixture (BANIF)
NASA Technical Reports Server (NTRS)
Willey, Norman F., Jr.; Linker, James F.
1994-01-01
Blind-anchor-nut-installation fixture, BANIF, developed for replacing or installing anchor nuts in blind holes or other inaccessible places. Attachment of anchor nut to BANIF enables placement of anchor nut on blind side of component.
A framework for sea level rise vulnerability assessment for southwest U.S. military installations
Chadwick, B.; Flick, Reinhard; Helly, J.; Nishikawa, Tracy; Pei, Fang Wang; O'Reilly, W.; Guza, R.; Bromirski, Peter; Young, A.; Crampton, W.; Wild, B.; Canner, I.
2011-01-01
We describe an analysis framework to determine military installation vulnerabilities under increases in local mean sea level as projected over the next century. The effort is in response to an increasing recognition of potential climate change ramifications for national security and recommendations that DoD conduct assessments of the impact on U.S. military installations of climate change. Results of the effort described here focus on development of a conceptual framework for sea level rise vulnerability assessment at coastal military installations in the southwest U.S. We introduce the vulnerability assessment in the context of a risk assessment paradigm that incorporates sources in the form of future sea level conditions, pathways of impact including inundation, flooding, erosion and intrusion, and a range of military installation specific receptors such as critical infrastructure and training areas. A unique aspect of the methodology is the capability to develop wave climate projections from GCM outputs and transform these to future wave conditions at specific coastal sites. Future sea level scenarios are considered in the context of installation sensitivity curves which reveal response thresholds specific to each installation, pathway and receptor. In the end, our goal is to provide a military-relevant framework for assessment of accelerated SLR vulnerability, and develop the best scientifically-based scenarios of waves, tides and storms and their implications for DoD installations in the southwestern U.S.
Final Report- Local Energy Matters: Solar Development in Duluth, Minnesota
DOE Office of Scientific and Technical Information (OSTI.GOV)
Slick, Jodi Lyn
The Local Energy Matters project advanced solar deployment in the City of Duluth, MN- a cold-climate community of 86,000. At the beginning of the project, Duluth had 254.57 kW installed solar capacity with an average cost of 5.04 USD/watt installed in 2014. The project worked with cross-sector stakeholders to benchmark the current market, implement best practices for solar deployment and soft cost reduction, develop pilot deployment programs in residential rooftop, community solar, and commercial/industrial sectors, work with the City of Duluth to determine appropriate sites for utility scale developments, and demonstrate solar pus storage. Over the three years of themore » project, Duluth’s installed residential and commercial solar capacity grew by 344% to 875.9 kW with an additional 702 kW solar garden capacity subscribed by Duluth residents, businesses, and institutions. Installation costs dropped 48% over this timeframe to 4.08 USD/watt installed (exclusive of solar garden construction). This report documents the process used to identify levers for increased solar installation and cost reductions in a nascent cold-climate solar market.« less
Installation package for a solar heating and hot water system
NASA Technical Reports Server (NTRS)
1978-01-01
Development and installation of two commercial solar heating and hot water systems are reported. The systems consist of the following subsystems: collector, storage, transport, hot water, auxiliary energy and controls. General guidelines are provided which may be utilized in development of detailed installation plans and specifications. In addition, operation, maintenance and repair of a solar heating and hot water system instructions are included.
DOE Office of Scientific and Technical Information (OSTI.GOV)
None
Elcam, Incorporated of Santa Barbara, California, has developed two solar water heating systems. The systems have been installed at Tempe, Arizona and San Diego, California. The systems consist of the following: collector, collector-tank water loop, solar tank, conventional tank and controls. General guidelines are provided which may be utilized in development of detailed instalation plans and specifications. In addition, it provides instruction on operation, maintenance and installation of solar hot water systems.
Offshore wind development research (technical brief).
DOT National Transportation Integrated Search
2014-04-01
The study addresses all aspects of Offshore Wind (OSW) development. This includes identifying : vessel types, vessel installation methods, needs and operating characteristics through all phases : of OSW installation, construction, operations and main...
Development of guidelines for the installation of marked crosswalks.
DOT National Transportation Integrated Search
2004-01-01
The Manual on Uniform Traffic Control Devices (MUTCD) provides little guidance on the installation of marked crosswalks, especially at locations other than intersections, i.e., mid-block locations. Crosswalks have typically been installed and designe...
Transport and installation of the Dark Energy Survey CCD imager
NASA Astrophysics Data System (ADS)
Derylo, Greg; Chi, Edward; Diehl, H. Thomas; Estrada, Juan; Flaugher, Brenna; Schultz, Ken
2012-09-01
The Dark Energy Survey CCD imager was constructed at the Fermi National Accelerator Laboratory and delivered to the Cerro Tololo Inter-American Observatory in Chile for installation onto the Blanco 4m telescope. Several efforts are described relating to preparation of the instrument for transport, development and testing of a shipping crate designed to minimize transportation loads transmitted to the camera, and inspection of the imager upon arrival at the observatory. Transportation loads were monitored and are described. For installation of the imager at the telescope prime focus, where it mates with its previously-installed optical corrector, specialized tooling was developed to safely lift, support, and position the vessel. The installation and removal processes were tested on the Telescope Simulator mockup at FNAL, thus minimizing technical and schedule risk for the work performed at CTIO. Final installation of the imager is scheduled for August 2012.
Zhong, Dexing; Lv, Hongqiang; Han, Jiuqiang; Wei, Quanrui
2014-01-01
The so-called Internet of Things (IoT) has attracted increasing attention in the field of computer and information science. In this paper, a specific application of IoT, named Safety Management System for Tower Crane Groups (SMS-TC), is proposed for use in the construction industry field. The operating status of each tower crane was detected by a set of customized sensors, including horizontal and vertical position sensors for the trolley, angle sensors for the jib and load, tilt and wind speed sensors for the tower body. The sensor data is collected and processed by the Tower Crane Safety Terminal Equipment (TC-STE) installed in the driver's operating room. Wireless communication between each TC-STE and the Local Monitoring Terminal (LMT) at the ground worksite were fulfilled through a Zigbee wireless network. LMT can share the status information of the whole group with each TC-STE, while the LMT records the real-time data and reports it to the Remote Supervision Platform (RSP) through General Packet Radio Service (GPRS). Based on the global status data of the whole group, an anti-collision algorithm was executed in each TC-STE to ensure the safety of each tower crane during construction. Remote supervision can be fulfilled using our client software installed on a personal computer (PC) or smartphone. SMS-TC could be considered as a promising practical application that combines a Wireless Sensor Network with the Internet of Things. PMID:25196106
Zhong, Dexing; Lv, Hongqiang; Han, Jiuqiang; Wei, Quanrui
2014-07-30
The so-called Internet of Things (IoT) has attracted increasing attention in the field of computer and information science. In this paper, a specific application of IoT, named Safety Management System for Tower Crane Groups (SMS-TC), is proposed for use in the construction industry field. The operating status of each tower crane was detected by a set of customized sensors, including horizontal and vertical position sensors for the trolley, angle sensors for the jib and load, tilt and wind speed sensors for the tower body. The sensor data is collected and processed by the Tower Crane Safety Terminal Equipment (TC-STE) installed in the driver's operating room. Wireless communication between each TC-STE and the Local Monitoring Terminal (LMT) at the ground worksite were fulfilled through a Zigbee wireless network. LMT can share the status information of the whole group with each TC-STE, while the LMT records the real-time data and reports it to the Remote Supervision Platform (RSP) through General Packet Radio Service (GPRS). Based on the global status data of the whole group, an anti-collision algorithm was executed in each TC-STE to ensure the safety of each tower crane during construction. Remote supervision can be fulfilled using our client software installed on a personal computer (PC) or smartphone. SMS-TC could be considered as a promising practical application that combines a Wireless Sensor Network with the Internet of Things.
Evaluation of Cable Harness Post-Installation Testing. Part B
NASA Technical Reports Server (NTRS)
King, M. S.; Iannello, C. J.
2011-01-01
The Cable Harness Post-Installation Testing Report was written in response to an action issued by the Ares Project Control Board (PCB). The action for the Ares I Avionics & Software Chief Engineer and the Avionics Integration and Vehicle Systems Test Work Breakdown Structure (WBS) Manager in the Vehicle Integration Office was to develop a set of guidelines for electrical cable harnesses. Research showed that post-installation tests have been done since the Apollo era. For Ares I-X, the requirement for post-installation testing was removed to make it consistent with the avionics processes used on the Atlas V expendable launch vehicle. Further research for the report involved surveying government and private sector launch vehicle developers, military and commercial aircraft, spacecraft developers, and harness vendors. Responses indicated crewed launch vehicles and military aircraft perform post-installation tests. Key findings in the report were as follows: Test requirements identify damage, human-rated vehicles should be tested despite the identification of statistically few failures, data does not support the claim that post-installation testing damages the harness insulation system, and proper planning can reduce overhead associated with testing. The primary recommendation of the report is for the Ares projects to retain the practice of post-fabrication and post-installation cable harness testing.
ERIC Educational Resources Information Center
Comptroller General of the U.S., Washington, DC.
The General Accounting Office (GAO) reviewed the Department of Defense (DOD) management of its employee training program at 14 installations to see what had been done in response to the recommendations for improvements and to determine the current status of the program. The findings and conclusions are contained in four chapters: (1)…
Loblolly pine growth and soil nutrient stocks eight years after forest slash incorporation
Felipe G. Sanchez; Emily A. Carter; Zakiya H. Leggett
2009-01-01
Incorporation of forest slash during stand establishment is proposed as a means of increasing soil carbon and nutrient stocks. If effective, the increased soil carbon and nutrient status may result in increased aboveground tree growth. Eight years after study installation, the impact of forest slash incorporation into the soil on soil carbon and nutrient stocks, foliar...
NASA Astrophysics Data System (ADS)
1992-10-01
This report includes the printouts from the International Geothermal Power Plant Data Base and the Geothermally Active Entity Data Base. Also included are the explanation of the abbreviations used in the power plant data base, maps of geothermal installations by country, and data base questionnaires and mailing lists.
Current situation and control measures of groundwater pollution in gas station
NASA Astrophysics Data System (ADS)
Wu, Qiong; Zhang, Xiaofeng; Zhang, Qianjin
2017-11-01
In recent years, pollution accidents caused by gas station leakage has occurred worldwide which can be persistent in groundwater. Numerous studies have demonstrated that the contaminated groundwater is threatening the ecological environment and human health. In this article, current status and sources of groundwater pollution by gas station are analyzed, and experience of how to prevent groundwater pollution from gas stations are summarized. It is demonstrated that installation of secondary containment measures for the oil storage of the oil tank system, such as installation of double-layer oil tanks or construction of impermeable ponds, is a preferable method to prevent gas stations from groundwater pollution. Regarding to the problems of groundwater pollution caused by gas station, it is proposed that it is urgent to investigate the leakage status of gas station. Relevant precise implementation regulations shall be issued and carried out, and supervision management of gas stations would need to be strengthened. Then single-layer steel oil tanks shall be replaced by double-layer tanks, and the impermeable ponds should be constructed according to the risk ranking. From the control methodology, the groundwater environment monitoring systems, supervision level, laws and regulations as well as pollution remediation should also be carried out and strengthened.
The GINGER project and status of the GINGERino prototype at LNGS
NASA Astrophysics Data System (ADS)
Ortolan, A.; Belfi, J.; Bosi, F.; Di Virgilio, A.; Beverini, N.; Carelli, G.; Maccioni, E.; Santagata, R.; Simonelli, A.; Beghi, A.; Cuccato, D.; Donazzan, A.; Naletto, G.
2016-05-01
GINGER (Gyroscopes IN GEneral Relativity) is a proposal for measuring in a ground-based laboratory the Lense-Thirring effect, known also as inertial frame dragging, that is predicted by General Relativity, and is induced by the rotation of a massive source. GINGER will consist in an array of at least three square ring lasers, mutually orthogonal, with about 6-10 m side, and located in a deep underground site, possibly the INFN - National Laboratories of Gran Sasso. The tri-axial design will provide a complete estimation of the laboratory frame angular velocity, to be compared with the Earths rotation estimate provided by IERS with respect the fixed stars frame. Large-size ring lasers have already reached a very high sensitivity, allowing for relevant geodetic measurements. The accuracy required for Lense-Thirring effect measurement is higher than 10-14 rad/s and therefore Earth angular velocity must be measured within one part in 10-9. A 3.6 m side, square ring laser, called GINGERino, has been recently installed inside the Gran Sasso underground laboratories in order to qualify the site for a future installation of GINGER. We discuss the current status of the experimental work, and in particular of the GINGERino prototype.
24 CFR 3286.511 - Inspector qualifications.
Code of Federal Regulations, 2010 CFR
2010-04-01
... URBAN DEVELOPMENT MANUFACTURED HOME INSTALLATION PROGRAM Inspection of Installations in HUD-Administered... a manufactured home that is subject to the requirements of the HUD-administered installation program: (1) A manufactured home or residential building inspector employed by the local authority having...
The search for 0νββ decay with the GERDA experiment: Status and prospects
NASA Astrophysics Data System (ADS)
Majorovits, B.
2015-08-01
The GERDA experiment is designed to search for neutrinoless double beta decay of 76Ge using HPGe detectors directly immersed into liquid argon. In its first phase the GERDA experiment has yielded a half life limit on this decay of T1/2 0 v>2.1 ṡ1025 . A background model has been developed. It explains the measured spectrum well, taking into account only components with distances to the detectors less then 2 cm. Competitive limits on Majoron accompanied double beta decay have been derived. Phase II of the experiment, now with additional liquid argon veto installed, is presently starting its commissioning phase. First commissioning spectra from calibration measurements are shown, proving that the liquid argon veto leads to a significant reduction of background events.
NASA Astrophysics Data System (ADS)
Abbrescia, M.; An, S.; Antolini, R.; Badalà, A.; Baldini Ferroli, R.; Bencivenni, G.; Blanco, F.; Bressan, E.; Chiavassa, A.; Chiri, C.; Cifarelli, L.; Cindolo, F.; Coccia, E.; de Pasquale, S.; di Giovanni, A.; D'Incecco, M.; Fabbri, F. L.; Frolov, V.; Garbini, M.; Gustavino, C.; Hatzifotiadou, D.; Imponente, G.; Kim, J.; La Rocca, P.; Librizzi, F.; Maggiora, A.; Menghetti, H.; Miozzi, S.; Moro, R.; Panareo, M.; Pappalardo, G. S.; Piragino, G.; Riggi, F.; Romano, F.; Sartorelli, G.; Sbarra, C.; Selvi, M.; Serci, S.; Williams, C.; Zichichi, A.; Zuyeuski, R.
2008-04-01
The EEE Project, conceived by its leader Antonino Zichichi, aims to detect Extreme Energy Events of cosmic rays with an array of muon telescopes distributed over the Italian territory. The Project involves Italian High Schools in order to introduce young people to Physics, also countervailing the recent crisis of university scientific classes inscriptions. The detectors for the EEE telescopes are Multigap Resistive Plate Chambers (MRPC) and have been constructed by teams of High School students who went in shift at the CERN laboratories. The mechanics and the electronics were developed by groups of researchers from CERN, the Italian Centro Fermi and INFN. The first group of schools of the EEE Project has inaugurated their telescopes recently. A status report of the Project and the preliminary results are presented.
Barbosa, F.; Bessuille, J.; Chudakov, E.; ...
2017-02-03
We present the GlueX DIRC (Detection of Internally Reflected Cherenkov light) detector that is being developed to upgrade the particle identification capabilities in the forward region of the GlueX experiment at Jefferson Lab. The GlueX DIRC will utilize four existing decommissioned BaBar DIRC bar boxes, which will be oriented to form a plane roughly 4 m away from the fixed target of the experiment. A new photon camera has been designed that is based on the SuperB FDIRC prototype. The full GlueX DIRC system will consist of two such cameras, with the first planned to be built and installed inmore » 2017. In addition, we present the current status of the design and R&D, along with the future plans of the GlueX DIRC detector.« less
NASA Technical Reports Server (NTRS)
Randolph, Joseph L.; Shepard, Kenneth E.
1990-01-01
The Satellite Resources Management and Tracking System was developed specifically for the Hubble Space Telescope (HST) program, and now, NASA has the ability to immediately access the necessary data for planning successful orbital satellite servicing operations. This system is an online, real-time data base system that contains a plethora of data on each item identified to support the HST throughout its planned 15 year life. Some of the information provided includes the current status, location, quantity, and history of each asset, a separate record for each discrete serial numbered item, procurement lead times on items sensitive to technology obsolescence, and the maintenance and repair history of each asset. Finally, details are provided on organizational, operational and logistics requirements.
1979-02-01
A 0 ’A099 7 1 3 tAU N A E R O S P A C E C O R P B E T H P A G E N Y F / 6 ~ ~ i DEVELOPMENT OF ENVIRONMENTAL. PROFILES FOR TESTING EQUIPMENT...IHIlia- ’ -Q IIIII.L25 MICROCOPY RESOLUTION’ TEST CHART C RMS-9-R-1 DEVELOPMENT OF ENVIRONMENTAL PROFILES FOR TESTING EQUIPMENT INSTALLED IN NAVAL... Development of Environmental Profiles for Testing ,’~ Final j quipment Installed in Naval Aircraft (Fixed Wing), e 7- e* 8 S. PERFORMING ORGANIZATION
Installation package for a sunspot cascade solar water heating system
NASA Technical Reports Server (NTRS)
1980-01-01
Solar water heating systems installed at Tempe, Arizona and San Diego, California are described. The systems consist of the following: collector, collector-tank water loop, solar tank, conventional tank, and controls. General guidelines which may be utilized in development of detailed installation plans and specifications are provided along with instruction on operation, maintenance, and installation of solar hot water systems.
Description and status of NASA-LeRC/DOE photovoltaic applications systems experiments
NASA Technical Reports Server (NTRS)
Ratajczak, A. F.
1978-01-01
In its role of supporting the DOE Photovoltaic Program, the NASA-Lewis Research Center has designed, fabricated and installed 16 geographically dispersed photovoltaic systems. These systems are powering a refrigerator, highway warning sign, forest lookout towers, remote weather stations, a water chiller at a visitor center, and insect survey traps. Each of these systems is described in terms of load requirements, solar array and battery size, and instrumentation and controls. Operational experience is described and present status is given for each system. The P/V power systems have proven to be highly reliable with almost no problems with modules and very few problems overall
24 CFR 3286.5 - Overview of installation program.
Code of Federal Regulations, 2010 CFR
2010-04-01
... 24 Housing and Urban Development 5 2010-04-01 2010-04-01 false Overview of installation program. 3286.5 Section 3286.5 Housing and Urban Development Regulations Relating to Housing and Urban Development (Continued) OFFICE OF ASSISTANT SECRETARY FOR HOUSING-FEDERAL HOUSING COMMISSIONER, DEPARTMENT OF...
Do residents want automated external defibrillators in their retirement home?
Woolley, Douglas C; Medvene, Louis J; Kellerman, Rick D; Base, Michelle; Mosack, Victoria
2006-03-01
The administration of a continuing care retirement community (CCRC), while weighing practical and ethical questions surrounding installation of automated external defibrillators (AEDs), wanted to consider resident opinions. No databased studies on this subject were found. After an information session about AEDs, CCRC residents were surveyed concerning their opinions on AED installation, their beliefs and concerns regarding AEDs, their advance directive status, and their demographic characteristics. Correlations were sought between choices about AED installation and beliefs, advance directives, and demographics. Seventy-eight percent of 107 eligible residents participated. Twenty-seven percent wanted AEDs installed, 37% were not sure, 23% were opposed, and 11% did not answer this question. Univariate analysis showed that women, the widowed or single, and those with a college degree were more likely to oppose AEDs. In the best logistic regression (LR) model the hope that "AED use could be life saving" and the fears that "AED use might lead to a very poor quality of life" and that "AEDs might be misused" were more important than any demographic variables and only education remained in the model. Those opposing AEDs supplied powerful written comments to support their choice. There is no consensus and great indecision about AED installation among the residents of this CCRC. The subjects were somewhat older and more affluent than the typical retirement home population, pointing to the need for replicating the investigation with a larger and more diverse study population. However, these findings suggest that AED installation in a retirement home would be premature without engaging the entire community in discussions and education in a process considerate of the wishes of all residents, which are likely to be quite diverse.
Cook-Mozaffari, P. J.; Darby, S. C.; Doll, R.; Forman, D.; Hermon, C.; Pike, M. C.; Vincent, T.
1989-01-01
The distribution of mortality from 11 causes of death (lymphoid leukaemia, other leukaemia, leukaemia of all types, Hodgkin's disease, other lymphomas, all lymphomas, multiple myeloma, lung cancer, other malignancies, all malignancies and all other causes) has been examined in three age groups throughout England and Wales over the period 1969-78. The reorganisation of local authority administration in 1974 meant that the smallest areas that could be examined were 400 county districts or (in some cases) approximate county districts formed by aggregating pre-1974 local authority areas. The variation in the numbers of deaths observed about the numbers expected was assessed using log-linear models to estimate the effect on the relative risk in each district associated with social class, rural status, population size, health authority region and proximity to one of 15 nuclear installations. Trends in risk with increasing proximity to an installation (as judged by the proportion of the population resident within 10 miles) were examined after adjustment for the other four variables. The results showed that in districts near to an installation there were significant excess mortalities in persons under 25 years of age from leukaemia (RR = 1.15, P = 0.01) and especially from lymphoid leukaemia (RR 1.21, P = 0.01) and from Hodgkin's disease (RR 1.24, P = 0.05) and a significant deficiency of mortality from lymphoid leukaemia in persons aged 25-64 years. No significant trends were observed with an increasing proportion of the population near to the installations and the greatest excess mortality from lymphoid leukaemia in young persons was observed in the districts with the intermediate proportion of the population (10.0-65.9%) near an installation. PMID:2930718
Park, Jin Yong; Lee, Byoung-Seob; Choi, Seyong; Kim, Seong Jun; Ok, Jung-Woo; Yoon, Jang-Hee; Kim, Hyun Gyu; Shin, Chang Seouk; Hong, Jonggi; Bahng, Jungbae; Won, Mi-Sook
2016-02-01
The 28 GHz superconducting electron cyclotron resonance (ECR) ion source has been developed to produce a high current heavy ion for the linear accelerator at KBSI (Korea Basic Science Institute). The objective of this study is to generate fast neutrons with a proton target via a p(Li,n)Be reaction. The design and fabrication of the essential components of the ECR ion source, which include a superconducting magnet with a liquid helium re-condensed cryostat and a 10 kW high-power microwave, were completed. The waveguide components were connected with a plasma chamber including a gas supply system. The plasma chamber was inserted into the warm bore of the superconducting magnet. A high voltage system was also installed for the ion beam extraction. After the installation of the ECR ion source, we reported the results for ECR plasma ignition at ECRIS 2014 in Russia. Following plasma ignition, we successfully extracted multi-charged ions and obtained the first results in terms of ion beam spectra from various species. This was verified by a beam diagnostic system for a low energy beam transport system. In this article, we present the first results and report on the current status of the KBSI accelerator project.
Production Facility Prototype Blower Installation Report with 1000 Hr Test Results
DOE Office of Scientific and Technical Information (OSTI.GOV)
Woloshun, Keith Albert; Olivas, Eric Richard; Dale, Gregory E.
2016-09-23
The roots blower in use at ANL for in-beam experiments and also at LANL for flow tests was sized for 12 mm diameter disks and significantly less beam heating. Currently, the disks are 29 mm in diameter, with a 12 mm FWHM Gaussian beam spot at 42 MeV and 2.86 μA on each side of the target, 5.72 μA total. The target design itself is reported elsewhere. With the increased beam heating, the helium flow requirement increased so that a larger blower was needed for a mass flow rate of 400 g/s at 2.76 MPa (400 psig). An Aerzen GMmore » 12.4 blower was selected, and is currently being installed at the LANL facility for target and component flow testing. This report describes this blower/motor/pressure vessel package and the status of the facility preparations. The blower has been operated for 1000 hours as a preliminary investigation of long-term performance, operation and possible maintenance issues. The blower performed well, with no significant change in blower head or mass flow rate developed under the operating conditions. Upon inspection, some oil had leaked out of the shaft seal of the blower. The shaft seal and bearing race have been replaced.« less
Production Facility Prototype Blower Installation Report with 1000 Hour Test Results
DOE Office of Scientific and Technical Information (OSTI.GOV)
Woloshun, Keith Albert; Dale, Gregory E.; Romero, Frank Patrick
2016-04-01
The roots blower in use at ANL for in-beam experiments and also at LANL for flow tests was sized for 12 mm diameter disks and significantly less beam heating. Currently, the disks are 29 mm in diameter, with a 12 mm FWHM Gaussian beam spot at 42 MeV and 2.86 μA on each side of the target, 5.72 μA total. The target design itself is reported elsewhere. With the increased beam heating, the helium flow requirement increased so that a larger blower was needed for a mass flow rate of 400 g/s at 2.76 MPa (400 psig). An Aerzen GMmore » 12.4 blower was selected, and is currently being installed at the LANL facility for target and component flow testing. This report describes this blower/motor/pressure vessel package and the status of the facility preparations. The blower has been operated for 1000 hours as a preliminary investigation of long term performance, operation and possible maintenance issues. The blower performed well, with no significant change in blower head or mass flow rate developed under the operating conditions. Upon inspection, some oil had leaked out of the shaft seal of the blower. The shaft seal and bearing race have been replaced. Test results and conclusions are reported.« less
First results of 28 GHz superconducting electron cyclotron resonance ion source for KBSI accelerator
DOE Office of Scientific and Technical Information (OSTI.GOV)
Park, Jin Yong; Lee, Byoung-Seob; Choi, Seyong
The 28 GHz superconducting electron cyclotron resonance (ECR) ion source has been developed to produce a high current heavy ion for the linear accelerator at KBSI (Korea Basic Science Institute). The objective of this study is to generate fast neutrons with a proton target via a p(Li,n)Be reaction. The design and fabrication of the essential components of the ECR ion source, which include a superconducting magnet with a liquid helium re-condensed cryostat and a 10 kW high-power microwave, were completed. The waveguide components were connected with a plasma chamber including a gas supply system. The plasma chamber was inserted intomore » the warm bore of the superconducting magnet. A high voltage system was also installed for the ion beam extraction. After the installation of the ECR ion source, we reported the results for ECR plasma ignition at ECRIS 2014 in Russia. Following plasma ignition, we successfully extracted multi-charged ions and obtained the first results in terms of ion beam spectra from various species. This was verified by a beam diagnostic system for a low energy beam transport system. In this article, we present the first results and report on the current status of the KBSI accelerator project.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Doyle, C.; Truitt, A.; Inda, D.
The following Photovoltaics Installation Best Practices Guide is one of several work products developed by the Solar Access to Public Capital (SAPC) working group, which works to open capital market investment. SAPC membership includes over 450 leading solar developers, financiers and capital managers, law firms, rating agencies, accounting and engineering firms, and other stakeholders engaged in solar asset deployment. SAPC activities are directed toward foundational elements necessary to pool project cash flows into tradable securities: standardization of power purchase and lease contracts for residential and commercial end customers; development of performance and credit data sets to facilitate investor due diligencemore » activities; comprehension of risk perceived by rating agencies; and the development of best practice guides for PV system installation and operations and maintenance (O&M) in order to encourage high-quality system deployment and operation that may improve lifetime project performance and energy production. This PV Installation Best Practices Guide was developed through the SAPC Installation Best Practices subcommittee, a subgroup of SAPC comprised of a wide array of solar industry leaders in numerous fields of practice. The guide was developed over roughly one year and eight months of direct engagement by the subcommittee and two working group comment periods.« less
The effect of automated monitoring and real-time prompting on nurses' hand hygiene performance.
Levchenko, Alexander I; Boscart, Veronique M; Fernie, Geoff R
2013-10-01
Adequate hand hygiene compliance by healthcare staff is considered an effective method to reduce hospital-acquired infections. The electronic system developed at Toronto Rehabilitation Institute automatically detects hand hygiene opportunities and records hand hygiene actions. It includes an optional visual hand hygiene status indication, generates real-time hand hygiene prompting signals, and enables automated monitoring of individual and aggregated hand hygiene performance. The system was installed on a complex continuous care unit at the entrance to 17 patient rooms and a utility room. A total of 93 alcohol gel and soap dispensers were instrumented and 14 nurses were provided with the personal wearable electronic monitors. The study included three phases with the system operating in three different modes: (1) an inactive mode during the first phase when hand hygiene opportunities and hand hygiene actions were recorded but prompting and visual indication functions were disabled, (2) only hand hygiene status indicators were enabled during the second phase, and (3) both hand hygiene status and real-time hand hygiene prompting signals were enabled during the third phase. Data collection was performed automatically during all of the three phases. The system indicated significantly higher hand hygiene activity rates and compliance during the third phase, with both hand hygiene indication and real-time prompting functions enabled. To increase the efficacy of the technology, its use was supplemented with individual performance reviews of the automatically collected data.
Renewable Energy Opportunities at the Kanto Installations, Japan
DOE Office of Scientific and Technical Information (OSTI.GOV)
Solana, Amy E.; Horner, Jacob A.; Russo, Bryan J.
2010-09-24
This document provides an overview of renewable resource development potential at the U.S. Army installations in the Kanto region in Japan, which includes Camp Zama, Yokohama North Dock, Sagamihara Family Housing Area (SFHA), Sagami General Depot, and Akasaka Press Center. This effort focuses on grid-connected generation of electricity from renewable energy sources and also on ground source heat pumps for heating and cooling buildings. The effort was funded by the Huntsville Army Corps of Engineers, and includes the development of a methodology for renewable resource assessment at Army installations located on foreign soil. The methodology is documented in Renewable Energymore » Assessment Methodology for Japanese OCONUS Army Installations. The site visit to the Kanto installations took place on April 5 and 6, 2010. At the current time, there are some renewable technologies that show economic potential. Because of siting restrictions and the small size of these installations, development of most renewable energy technologies will likely be limited to Camp Zama. Project feasibility is based on installation-specific resource availability and energy costs and projections based on accepted life-cycle cost methods. Development of any renewable energy project will be challenging, as it will require investigation into existing contractual obligations, new contracts that could be developed, the legality of certain partnerships, and available financing avenues, which involves the U.S. Forces Japan (USFJ), the Government of Japan (GOJ), and a number of other parties on both sides. The Army will not be able to implement a project without involvement and approval from the other services and multiple levels of Japanese government. However, implementation of renewable energy projects could be an attractive method for GOJ to reduce greenhouse gas emissions and lower annual utility payments to USFJ. This report recommends projects to pursue and offers approaches to use. The most promising opportunities include waste-to-energy and ground source heat pumps. Solar photovoltaics (PV) may also prove successful. Other resources were found to be insufficient on the Kanto installations.« less
Daamen, Ruby C.; Edwin A. Roehl, Jr.; Conrads, Paul
2010-01-01
A technology often used for industrial applications is “inferential sensor.” Rather than installing a redundant sensor to measure a process, such as an additional waterlevel gage, an inferential sensor, or virtual sensor, is developed that estimates the processes measured by the physical sensor. The advantage of an inferential sensor is that it provides a redundant signal to the sensor in the field but without exposure to environmental threats. In the event that a gage does malfunction, the inferential sensor provides an estimate for the period of missing data. The inferential sensor also can be used in the quality assurance and quality control of the data. Inferential sensors for gages in the EDEN network are currently (2010) under development. The inferential sensors will be automated so that the real-time EDEN data will continuously be compared to the inferential sensor signal and digital reports of the status of the real-time data will be sent periodically to the appropriate support personnel. The development and application of inferential sensors is easily transferable to other real-time hydrologic monitoring networks.
NASA Astrophysics Data System (ADS)
Vest, K. F.; Jones, P.; French, D.; Sachs, H.; Clements, F.
1985-11-01
This report discusses the design of a two-node, color Video-Teleconferencing System for the System for the U.S. Navy and its installation at sites in Suitland, Maryland, and Pearl Harbor. It details the development of the audio, video, and fast-facsimile parts of the system; integration of the system into the communications network; design of a teleconference room; and installation of the system.
ERIC Educational Resources Information Center
Human Engineering Inst., Cleveland, OH.
THIS MODULE OF A 30-MODULE COURSE IS DESIGNED TO DEVELOP AN UNDERSTANDING OF THE OPERATION AND MAINTENANCE OF THE DIESEL ENGINE FUEL SYSTEM AND THE PROCEDURES FOR DIESEL ENGINE INSTALLATION. TOPICS ARE FUEL FLOW CHARACTERISTICS, PTG FUEL PUMP, PREPARATION FOR INSTALLATION, AND INSTALLING ENGINE. THE MODULE CONSISTS OF A SELF-INSTRUCTIONAL BRANCH…
DOE Office of Scientific and Technical Information (OSTI.GOV)
Musyurka, A. V., E-mail: musyurkaav@burges.rushydro.ru
This article presents the design, hardware, and software solutions developed and placed in service for the automated system of diagnostic monitoring (ASDM) for hydraulic engineering installations at the Bureya HPP, and assuring a reliable process for monitoring hydraulic engineering installations. Project implementation represents a timely solution of problems addressed by the hydraulic engineering installation diagnostics section.
Physical installation of Pelletron and electron cooling system
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hurh, P.
1997-09-01
Bremsstrahlung of 5 MeV electrons at a loss current of 50 microamp in the acceleration region is estimated to produce X-ray intensities of 7 Rad/sec. Radiation losses due to a misteer or sudden obstruction will of course be much higher still (estimated at 87,500 Rad/hr for a 0.5 mA beam current). It is estimated that 1.8 meters of concrete will be necessary to adequately shield the surrounding building areas at any possible Pelletron installation site. To satisfy our present electron cooling development plan, two Pelletron installations are required, the first at our development lab in the Lab B/NEF Enclosure areamore » and the second at the operational Main Injector service building, MI-30, in the main Injector ring. The same actual Pelletron and electron beam-line components will be used at both locations. The Lab B installation will allow experimentation with actual high energy electron beam to develop the optics necessary for the cooling straight while Main Injector/Recycler commissioning is taking place. The MI-30 installation is obviously the permanent home for the Pelletron when electron cooling becomes operational. Construction plans for both installations will be discussed here.« less
Digital control for the condensate system in a combined cycle power plant
DOE Office of Scientific and Technical Information (OSTI.GOV)
Sanchez Parra, M.; Fuentes Gutierrez, J.E.; Castelo Cuevas, L.
1994-12-31
This paper presents the highlights by means of which development, installation and start up of the digital control system (DCS)for the condenser and hotwell (condensate system) were performed. This system belongs to the distributed control system installed by the Instituto de Investigaciones Electricas (IIE) at the Combined Cycle Power Plant in Gomez Palacio (GP), Durango, Mexico, during the February-March period, in 1993. The main steps for development of the condenser and hotwell control system include: process modeling, definition of control strategies, algorithms, design and software development, PC simulation tests, laboratory tests with an equipment similar to the one installed atmore » the GP Power Plant, installation, and finally, start up, which was a joint effort with the GP Power Plant engineering staff.« less
Howe, Katherine B; Suharlim, Christian; Ueda, Peter; Howe, Daniel; Kawachi, Ichiro; Rimm, Eric B
2016-12-13
To estimate the effect of playing Pokémon GO on the number of steps taken daily up to six weeks after installation of the game. Cohort study using online survey data. Survey participants of Amazon Mechanical Turk (n=1182) residing in the United States, aged 18 to 35 years and using iPhone 6 series smartphones. Number of daily steps taken each of the four weeks before and six weeks after installation of Pokémon GO, automatically recorded in the "Health" application of the iPhone 6 series smartphones and reported by the participants. A difference in difference regression model was used to estimate the change in daily steps in players of Pokémon GO compared with non-players. 560 (47.4%) of the survey participants reported playing Pokémon GO and walked on average 4256 steps (SD 2697) each day in the four weeks before installation of the game. The difference in difference analysis showed that the daily average steps for Pokémon GO players during the first week of installation increased by 955 additional steps (95% confidence interval 697 to 1213), and then this increase gradually attenuated over the subsequent five weeks. By the sixth week after installation, the number of daily steps had gone back to pre-installation levels. No significant effect modification of Pokémon GO was found by sex, age, race group, bodyweight status, urbanity, or walkability of the area of residence. Pokémon GO was associated with an increase in the daily number of steps after installation of the game. The association was, however, moderate and no longer observed after six weeks. Published by the BMJ Publishing Group Limited. For permission to use (where not already granted under a licence) please go to http://group.bmj.com/group/rights-licensing/permissions.
NASA Astrophysics Data System (ADS)
Pazos, Antonio; Martín Davila, José; Buforn, Elisa; Jesús García Fernández, Maria; Bullón, Mercedes; Gárate, Jorge
2010-05-01
The Eurasian-African plate boundary crosses the called "Ibero-Maghrebian" region from San Vicente Cape (SW Portugal) to Tunisia including the South of Iberia, Alboran Sea, and northern of Morocco and Algeria. The low convergence rate at this plate boundary produces a continuous moderate seismic activity of low magnitude and shallow depth, where the occurrence of large earthquakes is separated by long time intervals. In this region, there are also intermediate and very deep earthquakes. Since more than hundred years ago San Fernando Naval Observatory (ROA), in collaboration with other Institutes, has deployed different geophysical and geodetic equipment in the Southern Spain - North-western Africa area in order to study this broad deformation. Currently a Broad Band seismic net (Western Mediterranean, WM net), a permanent geodetic GPS net and a Geomagnetic Observatory have been installed by ROA in this area. To complement the available data, since past October a permanent marine-on land geophysical observatory is being installed by ROA in Alboran Island and surrounding marine zones. Till now the following facilities has been installed: • Submarine: 2 km submarine fibre optics cable (power and data transmission); Broad Band Seismometer (CMG-3T, buried); Accelerometer (Guralp 3 channels), buried); Differential Pressure Gauge (DPG); Thermometer. • On land: Permanent geodetic GPS station; Automatic meteorological station; Data acquisition system for submarine equipment; Satellite Data Transmission system. Data are already being transmitted in real time to ROA headquarters via satellite Intranet. The marine part, currently installed in a 50 m depth platform, has been designed to be enlarged by extending the cable to greater depths and/or installing additional submarine equipment, such a way in short an ADCP profiler will be installed. In this work we aim to show the present status, scientific possibilities and the next future plans of this submarine-on land installation.
24 CFR 3286.505 - Minimum elements to be inspected.
Code of Federal Regulations, 2010 CFR
2010-04-01
... with respect to home design and construction; (b) Consideration of site-specific conditions; (c) Site... HOUSING AND URBAN DEVELOPMENT MANUFACTURED HOME INSTALLATION PROGRAM Inspection of Installations in HUD-Administered States § 3286.505 Minimum elements to be inspected. The installation of every manufactured home...
Pilot installation of a bridge scour monitoring site at FM 1157 Mustang Creek
DOT National Transportation Integrated Search
1999-12-01
A pilot installation was implemented at the Mustang Creek bridge crossing on FM 1157 in the Yoakum District, Jackson County, Texas. This pilot installation was developed in two phases. Phase 1 used a rather limited datalogger that lacked the ability ...
ERIC Educational Resources Information Center
National Instructional Television Library, New York, NY.
Information for a tabular study of instructional television (ITV) series was supplied via questionnaire by 81 educational television stations, the Midwest Program on Airborne Television Instruction, 41 closed-circuit installations, and 51 commercial channels. Most of the series offerings (72%) were designed for elementary grades. Offerings for…
The QCDSP project —a status report
NASA Astrophysics Data System (ADS)
Chen, Dong; Chen, Ping; Christ, Norman; Edwards, Robert; Fleming, George; Gara, Alan; Hansen, Sten; Jung, Chulwoo; Kaehler, Adrian; Kasow, Steven; Kennedy, Anthony; Kilcup, Gregory; Luo, Yubin; Malureanu, Catalin; Mawhinney, Robert; Parsons, John; Sexton, James; Sui, Chengzhong; Vranas, Pavlos
1998-01-01
We give a brief overview of the massively parallel computer project underway for nearly the past four years, centered at Columbia University. A 6 Gflops and a 50 Gflops machine are presently being debugged for installation at OSU and SCRI respectively, while a 0.4 Tflops machine is under construction for Columbia and a 0.6 Tflops machine is planned for the new RIKEN Brookhaven Research Center.
History and Status of the CIS Customs Union
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lawson, T.M.; Erickson, S.A.
1999-08-31
This report explores the history of the CIS Customs Union and the major obstacles the Union faces in its implementation. Investigation of the Customs Union is necessary as its implementation could effect the Second Line of Defense (SLD) Program. Russian Customs contends that radiation detectors should not be installed along the Customs Union members borders of as the borders will be dissolved when the Union is implemented.
Transonic Symposium: Theory, Application and Experiment, volume 2
NASA Technical Reports Server (NTRS)
Foughner, Jerome T., Jr. (Compiler)
1989-01-01
Papers presented at the Transonic Symposium are compiled. The following subject areas are covered: National Transonic Facility status; transonic aerodynamics of slender wing-body configuration; laminar flow flight experiments; laminar flow wind tunnel experiments; computational support of X-29A flight experiment; transition location on a clean-up glove installed on a F-14 aircraft; and design studies for a laminar glove for the X-29 aircraft.
Level-2 Milestone 3244: Deploy Dawn ID Machine for Initial Science Runs
DOE Office of Scientific and Technical Information (OSTI.GOV)
Fox, D
2009-09-21
This report documents the delivery, installation, integration, testing, and acceptance of the Dawn system, ASC L2 milestone 3244: Deploy Dawn ID Machine for Initial Science Runs, due September 30, 2009. The full text of the milestone is included in Attachment 1. The description of the milestone is: This milestone will be a result of work started three years ago with the planning for a multi-petaFLOPS UQ-focused platform (Sequoia) and will be satisfied when a smaller ID version of the final system is delivered, installed, integrated, tested, accepted, and deployed at LLNL for initial science runs in support of SSP mission.more » The deliverable for this milestone will be a LA petascale computing system (named Dawn) usable for code development and scaling necessary to ensure effective use of a final Sequoia platform (expected in 2011-2012), and for urgent SSP program needs. Allocation and scheduling of Dawn as an LA system will likely be performed informally, similar to what has been used for BlueGene/L. However, provision will be made to allow for dedicated access times for application scaling studies across the entire Dawn resource. The milestone was completed on April 1, 2009, when science runs began running on the Dawn system. The following sections describe the Dawn system architecture, current status, installation and integration time line, and testing and acceptance process. A project plan is included as Attachment 2. Attachment 3 is a letter certifying the handoff of the system to a nuclear weapons stockpile customer. Attachment 4 presents the results of science runs completed on the system.« less
Status review and prospects for solar industrial process heat (SIPH)
NASA Astrophysics Data System (ADS)
Kreith, F.; Davenport, R.; Feustel, J.
1983-11-01
Solar energy systems and components are presently available for industrial process hot air, hot water, and steam applications at temperatures up to about 300 C. Systems capable of operating at temperatures up to about 1000 C are approaching commercialization. A careful matching of the characteristics of the solar system and the industrial process in question has been found by field tests to be an important determinant of the amount of useful energy that can be delivered. While the thermal performance of solar collectors is not expected to improve significantly, better manufacturing, plumbing, and installation techniques may reduce both system and delivered energy costs significantly. Tax credits for solar installations, together with limited partnership financing, can offset the high initial cost of solar energy systems and provide equity between solar and fossil-fueled systems.
Prototype road weather performance management (RWPM) tool installation instructions & user manual.
DOT National Transportation Integrated Search
2016-07-20
This document is the Installation Instructions and User Manual for the Road Weather Performance Management (RW-PM) Tool developed for the project on Development and Demonstration of a Prototype Road Weather Performance Management Application that Use...
Prototype road weather performance management tool : installation instructions & user manual.
DOT National Transportation Integrated Search
2016-07-20
This document is the Installation Instructions and User Manual for the Road Weather Performance Management (RW-PM) Tool developed for the project on Development and Demonstration of a Prototype Road Weather Performance Management Application that Use...
Clinical and biological analysis in graftless maxillary sinus lift.
Parra, Marcelo; Olate, Sergio; Cantín, Mario
2017-08-01
Maxillary sinus lift for dental implant installation is a well-known and versatile technique; new techniques are presented based on the physiology of intrasinus bone repair. The aim of this review was to determine the status of graftless maxillary sinus lift and analyze its foundations and results. A search was conducted of the literature between 1995 and 2015 in the Medline, ScienceDirect, and SciELO databases using the keywords "maxillary sinus lift," "blood clot," "graftless maxillary sinus augmentation," and "dental implant placement." Ten articles were selected for our analysis of this technique and its results. Despite the limited information, cases that were followed for at least six months and up to four years had a 90% success rate. Published techniques included a lateral window, elevation of the sinus membrane, drilling and dental implant installation, descent of the membrane with variations in the installation of the lateral wall access and suturing. The physiology behind this new bone formation response and the results of the present research were also discussed. We concluded that this is a promising and viable technique under certain inclusion criteria.
Renewable energy water supply - Mexico program summary
DOE Office of Scientific and Technical Information (OSTI.GOV)
Foster, R.
1997-12-01
This paper describes a program directed by the US Agency for International Development and Sandia National Laboratory which installed sustainable energy sources in the form of photovoltaic modules and wind energy systems in rural Mexico to pump water and provide solar distillation services. The paper describes the guidelines which appeared most responsible for success as: promote an integrated development program; install quality systems that develop confidence; instill local project ownership; train local industry and project developers; develop a local maintenance infrastructure; provide users training and operations guide; develop clear lines of responsibilities for system upkeep. The paper emphasizes the importancemore » of training. It also presents much collected data as to the characteristics and performance of the installed systems.« less
NASA Technical Reports Server (NTRS)
Hein, G. F.
1982-01-01
The NASA Lewis Research Center in cooperation with the World Health Organization, U.S.A. I.D., the Pan American Health Organization and national government agencies in some developing countries sponsored the installation of twenty photovoltaic powered medical vaccine storage refrigerator-freezer (R/F) systems. The Solar Power Corporation was selected as the contractor to perform the design, development and installation of these twenty units. Solar Power's experiences are described herein.
32 CFR 50.5 - Responsibilities.
Code of Federal Regulations, 2010 CFR
2010-07-01
... personal commercial solicitation on DoD installations consistent with the policy set forth in this part. (2) Maintain and make available to installation commanders and appropriate Federal personnel the current master... installation. (3) Develop and maintain a list of all State Insurance Commissioners' points of contact for DoD...
Long-term tree inventory data from mountain forest plots in France.
Fuhr, Marc; Cordonnier, Thomas; Courbaud, Benoît; Kunstler, Georges; Mermin, Eric; Riond, Catherine; Tardif, Pascal
2017-04-01
We present repeated tree measurement data from 63 permanent plots in mountain forests in France. Plot elevations range from 800 (lower limit of the montane belt) to 1942 m above sea level (subalpine belt). Forests mainly consist of pure or mixed stands dominated by European beech (Fagus sylvatica), Silver fir (Abies alba), and Norway spruce (Picea abies), in association with various broadleaved species at low elevation and with Arolla pine (Pinus cembra) at high elevation. The plot network includes 23 plots in stands that have not been managed for the last 40 years (at least) and 40 plots in plots managed according to an uneven-aged system with single-tree or small-group selection cutting. Plot sizes range from 0.2 to 1.9 ha. Plots were installed from 1994 to 2004 and remeasured two to five times during the 1994-2015 period. During the first census (installation), living trees more than 7.5 cm in dbh were identified, their diameter at breast height (dbh) was measured and their social status (strata) noted. Trees were spatially located, either with x, y, and z coordinates (40 plots) or within 0.25-ha square subplots (23 plots). In addition, in a subset of plots (58 plots), tree heights and tree crown dimensions were measured on a subset of trees and dead standing trees and stumps were included in the census. Remeasurements after installation include live tree diameters (including recruited trees), tree status (living, damaged, dead, stump), and for a subset of trees, height. At the time of establishment of the plots, plot densities range from 181 to 1328 stems/ha and plot basal areas range from 13.6 to 81.3 m 2 /ha. © 2017 by the Ecological Society of America.
Amateur Radio on the International Space Station - Phase 2 Hardware System
NASA Technical Reports Server (NTRS)
Bauer, F.; McFadin, L.; Bruninga, B.; Watarikawa, H.
2003-01-01
The International Space Station (ISS) ham radio system has been on-orbit for over 3 years. Since its first use in November 2000, the first seven expedition crews and three Soyuz taxi crews have utilized the amateur radio station in the Functional Cargo Block (also referred to as the FGB or Zarya module) to talk to thousands of students in schools, to their families on Earth, and to amateur radio operators around the world. Early on, the Amateur Radio on the International Space Station (ARISS) international team devised a multi-phased hardware development approach for the ISS ham radio station. Three internal development Phases. Initial Phase 1, Mobile Radio Phase 2 and Permanently Mounted Phase 3 plus an externally mounted system, were proposed and agreed to by the ARISS team. The Phase 1 system hardware development which was started in 1996 has since been delivered to ISS. It is currently operational on 2 meters. The 70 cm system is expected to be installed and operated later this year. Since 2001, the ARISS international team have worked to bring the second generation ham system, called Phase 2, to flight qualification status. At this time, major portions of the Phase 2 hardware system have been delivered to ISS and will soon be installed and checked out. This paper intends to provide an overview of the Phase 1 system for background and then describe the capabilities of the Phase 2 radio system. It will also describe the current plans to finalize the Phase 1 and Phase 2 testing in Russia and outlines the plans to bring the Phase 2 hardware system to full operation.
QuakeML: Status of the XML-based Seismological Data Exchange Format
NASA Astrophysics Data System (ADS)
Euchner, Fabian; Schorlemmer, Danijel; Kästli, Philipp; Quakeml Working Group
2010-05-01
QuakeML is an XML-based data exchange standard for seismology that is in its fourth year of active community-driven development. The current release (version 1.2) is based on a public Request for Comments process that included contributions from ETH, GFZ, USC, SCEC, USGS, IRIS DMC, EMSC, ORFEUS, GNS, ZAMG, BRGM, Nanometrics, and ISTI. QuakeML has mainly been funded through the EC FP6 infrastructure project NERIES, in which it was endorsed as the preferred data exchange format. Currently, QuakeML services are being installed at several institutions around the globe, including EMSC, ORFEUS, ETH, Geoazur (Europe), NEIC, ANSS, SCEC/SCSN (USA), and GNS Science (New Zealand). Some of these institutions already provide QuakeML earthquake catalog web services. Several implementations of the QuakeML data model have been made. QuakePy, an open-source Python-based seismicity analysis toolkit using the QuakeML data model, is being developed at ETH. QuakePy is part of the software stack used in the Collaboratory for the Study of Earthquake Predictability (CSEP) testing center installations, developed by SCEC. Furthermore, the QuakeML data model is part of the SeisComP3 package from GFZ Potsdam. QuakeML is designed as an umbrella schema under which several sub-packages are collected. The present scope of QuakeML 1.2 covers a basic description of seismic events including picks, arrivals, amplitudes, magnitudes, origins, focal mechanisms, and moment tensors. Work on additional packages (macroseismic information, seismic inventory, and resource metadata) has been started, but is at an early stage. Contributions from the community that help to widen the thematic coverage of QuakeML are highly welcome. Online resources: http://www.quakeml.org, http://www.quakepy.org
76 FR 33161 - Installation and Use of Engine Cut-off Switches on Recreational Vessels
Federal Register 2010, 2011, 2012, 2013, 2014
2011-06-08
...-off switches as a standard safety feature on propulsion machinery and/or starting controls installed... not most, propulsion machinery and/or starting controls installed on recreational vessels are... new subpart N that would cover propulsion machinery capable of developing static thrust of 115 pounds...
System installation package for the New Hampshire Vocational Technical College, Manchester, N. H.
NASA Technical Reports Server (NTRS)
1979-01-01
A system installed in the residential solar laboratory located at the New Hampshire Vocational Technical College in Manchester, N. H. is described. General guidelines which may be utilized in development of detailed installation plans and specifications, as well as instructions on operation and maintenance are provided.
NASA Astrophysics Data System (ADS)
Yang, Z. L.; Cao, J.; Hu, K.; Gui, Z. P.; Wu, H. Y.; You, L.
2016-06-01
Efficient online discovering and applying geospatial information resources (GIRs) is critical in Earth Science domain as while for cross-disciplinary applications. However, to achieve it is challenging due to the heterogeneity, complexity and privacy of online GIRs. In this article, GeoSquare, a collaborative online geospatial information sharing and geoprocessing platform, was developed to tackle this problem. Specifically, (1) GIRs registration and multi-view query functions allow users to publish and discover GIRs more effectively. (2) Online geoprocessing and real-time execution status checking help users process data and conduct analysis without pre-installation of cumbersome professional tools on their own machines. (3) A service chain orchestration function enables domain experts to contribute and share their domain knowledge with community members through workflow modeling. (4) User inventory management allows registered users to collect and manage their own GIRs, monitor their execution status, and track their own geoprocessing histories. Besides, to enhance the flexibility and capacity of GeoSquare, distributed storage and cloud computing technologies are employed. To support interactive teaching and training, GeoSquare adopts the rich internet application (RIA) technology to create user-friendly graphical user interface (GUI). Results show that GeoSquare can integrate and foster collaboration between dispersed GIRs, computing resources and people. Subsequently, educators and researchers can share and exchange resources in an efficient and harmonious way.
W. M. Keck Observatory primary mirror segment repair project: overview and status
NASA Astrophysics Data System (ADS)
Meeks, Robert L.; Doyle, Steve; Higginson, Jamie; Hudek, John S.; Irace, William; McBride, Dennis; Pollard, Mike; Tai, Kuochou; Von Boeckmann, Tod; Wold, Leslie; Wold, Truman
2016-07-01
The W. M. Keck Observatory Segment Repair Project is repairing stress-induced fractures near the support points in the primary mirror segments. The cracks are believed to result from deficiencies in the original design and implementation of the adhesive joints connecting the Invar support components to the ZERODUR mirror. Stresses caused by temperature cycling over 20 years of service drove cracks that developed at the glass-metal interfaces. Over the last few years the extent and cause of the cracks have been studied, and new supports have been designed. Repair of the damaged glass required development of specialized tools and procedures for: (1) transport of the segments; (2) pre-repair metrology to establish the initial condition; (3) removal of support hardware assemblies; (4) removal of the original supports; (5) grinding and re-surfacing the damaged glass areas; (6) etching to remove sub-surface damage; (7) bonding new supports; (8) re-installation of support assemblies; and (9) post-repair metrology. Repair of the first segment demonstrated the new tools and processes. On-sky measurements before and after repair verified compliance with the requirements. This paper summarizes the repair process, on-sky results, and transportation system, and also provides an update on the project status and schedule for repairing all 84 mirror segments. Strategies for maintaining quality and ensuring that repairs are done consistently are also presented.
NASA Astrophysics Data System (ADS)
Morzinski, Katie M.; Close, Laird M.; Males, Jared R.; Hinz, Phil M.; Esposito, Simone; Riccardi, Armando; Briguglio, Runa; Follette, Katherine B.; Pinna, Enrico; Puglisi, Alfio; Vezilj, Jennifer; Xompero, Marco; Wu, Ya-Lin
2016-07-01
"MagAO" is the adaptive optics instrument at the Magellan Clay telescope at Las Campanas Observatory, Chile. MagAO has a 585-actuator adaptive secondary mirror and 1000-Hz pyramid wavefront sensor, operating on natural guide stars from R-magnitudes of -1 to 15. MagAO has been in on-sky operation for 166 nights since installation in 2012. MagAO's unique capabilities are simultaneous imaging in the visible and infrared with VisAO and Clio, excellent performance at an excellent site, and a lean operations model. Science results from MagAO include the first ground-based CCD image of an exoplanet, demonstration of the first accreting protoplanets, discovery of a new wide-orbit exoplanet, and the first empirical bolometric luminosity of an exoplanet. We describe the status, report the AO performance, and summarize the science results. New developments reported here include color corrections on red guide stars for the wavefront sensor; a new field stop stage to facilitate VisAO imaging of extended sources; and eyepiece observing at the visible-light diffraction limit of a 6.5-m telescope. We also discuss a recent hose failure that led to a glycol coolant leak, and the recovery of the adaptive secondary mirror (ASM) after this recent (Feb. 2016) incident.
Solar Energy Development on DoD Installations in the Mojave & Colorado Deserts
2011-11-30
roof mount • Acreage: – ~6.2 million acres on 9 installations – 250,000 acres with some level of suitability for solar – 120,000 acres are estimated...technologies: thin - film and crystalline PV x fixed and single-axis tracking; trough; dish/Stirling engine. • 2 ownership structures (MILCON and 3rd party...1icfi.com | Solar Energy Development on DoD Installations in the Mojave & Colorado Deserts Bob Kwartin ICF International November 30, 2011 Report
Environmental factor(tm) system: RCRA hazardous waste handler information (on CD-ROM). Data file
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1995-11-01
Environmental Factor(trademark) RCRA Hazardous Waste Handler Information on CD-ROM unleashes the invaluable information found in two key EPA data sources on hazardous waste handlers and offers cradle-to-grave waste tracking. It`s easy to search and display: (1) Permit status, design capacity, and compliance history for facilities found in the EPA Research Conservation and Recovery Information System (RCRIS) program tracking database; (2) Detailed information on hazardous wastes generation, management, and minimization by companies who are large quantity generators; and (3) Data on the waste management practices of treatment, storage, and disposal (TSD) facilities from the EPA Biennial Reporting System which is collectedmore » every other year. Environmental Factor`s powerful database retrieval system lets you: (1) Search for RCRA facilities by permit type, SIC code, waste codes, corrective action, or violation information, TSD status, generator and transporter status, and more. (2) View compliance information - dates of evaluation, violation, enforcement, and corrective action. (3) Lookup facilities by waste processing categories of marketing, transporting, processing, and energy recovery. (4) Use owner/operator information and names, titles, and telephone numbers of project managers for prospecting. (5) Browse detailed data on TSD facility and large quantity generators` activities such as onsite waste treatment, disposal, or recycling, offsite waste received, and waste generation and management. The product contains databases, search and retrieval software on two CD-ROMs, an installation diskette and User`s Guide. Environmental Factor has online context-sensitive help from any screen and a printed User`s Guide describing installation and step-by-step procedures for searching, retrieving, and exporting.« less
Environmental Assessment of Installation Development at MacDill Air Force Base, Florida
2007-01-01
effect. The essence of the Proposed Action is installation development, which includes demolition, renovation, repair, and new construction. This IDEA...Protection Attn: Jasmine Ruffington 3900 Commonwealth Blvd., MS 47 Tallahassee, FL 32399-3000 Florida State Clearinghouse Department of
DOT National Transportation Integrated Search
2001-06-01
Some advanced air bag technologies are currently being installed in vehicles and others are still being developed. The principal advanced technology that is currently being installed in some vehicles is air bags that can inflate with lower or higher ...
Army Net Zero Prove Out. Integrated Net Zero Best Practices
2014-11-18
leveraged to increase awareness. Public Service Announcements developed by the Army or other installations can be leveraged. Signage for...approaches can be leveraged to increase awareness. Public Service Announcements developed by the Army or other installations can be leveraged. Signage
DOE Office of Scientific and Technical Information (OSTI.GOV)
Wiser, Ryan; Dong, Changgui
Business process or “soft” costs account for well over 50% of the installed price of residential photovoltaic (PV) systems in the United States, so understanding these costs is crucial for identifying PV cost-reduction opportunities. Among these costs are those imposed by city-level permitting processes, which may add both expense and time to the PV development process. Building on previous research, this study evaluates the effect of city-level permitting processes on the installed price of residential PV systems and on the time required to develop and install those systems. The study uses a unique dataset from the U.S. Department of Energy’smore » Rooftop Solar Challenge Program, which includes city-level permitting process “scores,” plus data from the California Solar Initiative and the U.S. Census. Econometric methods are used to quantify the price and development-time effects of city-level permitting processes on more than 3,000 PV installations across 44 California cities in 2011. Results indicate that city-level permitting processes have a substantial and statistically significant effect on average installation prices and project development times. The results suggest that cities with the most favorable (i.e., highest-scoring) permitting practices can reduce average residential PV prices by $0.27–$0.77/W (4%–12% of median PV prices in California) compared with cities with the most onerous (i.e., lowest-scoring) permitting practices, depending on the regression model used. Though the empirical models for development times are less robust, results suggest that the most streamlined permitting practices may shorten development times by around 24 days on average (25% of the median development time). These findings illustrate the potential price and development-time benefits of streamlining local permitting procedures for PV systems.« less
Strain gage installation and survivability on geosynthetics used in flexible pavements
NASA Astrophysics Data System (ADS)
Brooks, Jeremy A.
The use of foil type strain gages on geosynthetics is poorly documented. In addition, very few individuals are versed in proper installation techniques or calibration methods. Due to the limited number of knowledgeable technicians there is no information regarding the susceptibility of theses gages to errors in installation by inexperienced installers. Also lacking in the documentation related to the use of foil type strain gages on geosynthetics is the survivability of the gages in field conditions. This research documented procedures for installation, calibration, and survivability used by the project team to instruments a full scale field installation in Marked Tree, AR. This research also addressed sensitivity to installation errors on both geotextile and geogrid. To document the process of gage installation an experienced technician, Mr. Joe Ables, formerly of the UASCE Waterways Experiment Station, was consulted. His techniques were combined with those discovered in related literature and those developed by the research team to develop processes that were adaptable to multiple gage geometries and parent geosynthetics. These processes were described and documented in a step by step manner with accompanying photographs, which should allow virtually anyone with basic electronics knowledge to install these gages properly. Calibration of the various geosynthetic / strain gage combinations was completed using wide width tensile testing on multiple samples of each material. The tensile testing process was documented and analyzed using digital photography to analyze strain on the strain gage itself. Calibration factors for each geosynthtics used in the full scale field testing were developed. In addition, the process was thoroughly documented to allow future researchers to calibrate additional strain gage and geosynthetic combinations. The sensitivity of the strain gages to installation errors was analyzed using wide width tensile testing and digital photography to determine the variability of the data collected from gages with noticeable installation errors as compared to properly installed gages. Induced errors varied based on the parent geosynthetics material, but included excessive and minimal waterproofing, gage rotation, gage shift, excessive and minimal adhesive, and excessive and minimal adhesive impregnation loads. The results of this work indicated that minor errors in geotextile gage installation that are noticeable and preventable by the experienced installer have no statistical significance on the data recorded during the life span of geotextile gages; however the lifespan of the gage may be noticeably shortened by such errors. Geogrid gage installation errors were found to cause statistically significant changes in the data recorded from improper installations. The issue of gage survivability was analyzed using small scale test sections instrumented and loaded similarly to field conditions anticipated during traditional roadway construction. Five methods of protection were tested for both geotextile and geogrid including a sand blanket, inversion, semi-hemispherical PCV sections, neoprene mats, and geosynthetic wick drain. Based on this testing neoprene mats were selected to protect geotextile installed gages, and wick drains were selected to protect geogrid installed gages. These methods resulted in survivability rates of 73% and 100% in the full scale installation respectively. This research and documentation may be used to train technicians to install and calibrate geosynthetic mounted foil type strain gages. In addition, technicians should be able to install gages in the field with a high probability of gage survivability using the protection methods recommended.
Investigation on installation of offshore wind turbines
NASA Astrophysics Data System (ADS)
Wang, Wei; Bai, Yong
2010-06-01
Wind power has made rapid progress and should gain significance as an energy resource, given growing interest in renewable energy and clean energy. Offshore wind energy resources have attracted significant attention, as, compared with land-based wind energy resources, offshore wind energy resources are more promising candidates for development. Sea winds are generally stronger and more reliable and with improvements in technology, the sea has become a hot spot for new designs and installation methods for wind turbines. In the present paper, based on experience building offshore wind farms, recommended foundation styles have been examined. Furthermore, wave effects have been investigated. The split installation and overall installation have been illustrated. Methods appropriate when installing a small number of turbines as well as those useful when installing large numbers of turbines were analyzed. This investigation of installation methods for wind turbines should provide practical technical guidance for their installation.
DOE Office of Scientific and Technical Information (OSTI.GOV)
O'Shaughnessy, Eric; Margolis, Robert
2017-04-01
The vast majority of U.S. residential solar PV installers are small local-scale companies, however the industry is relatively concentrated in a few large national-scale installers. We develop a novel approach using solar PV quote data to study the price behavior of large solar PV installers in the United States. Through a paired differences approach, we find that large installer quotes are about higher, on average, than non-large installer quotes made to the same customer. The difference is statistically significant and robust after controlling for factors such as system size, equipment quality, and time effects. The results suggest that low pricesmore » are not the primary value proposition of large installer systems. We explore several hypotheses for this finding, including that large installers are able to exercise some market power and/or earn returns from reputations.« less
Anammox-based technologies for nitrogen removal: Advances in process start-up and remaining issues.
Ali, Muhammad; Okabe, Satoshi
2015-12-01
Nitrogen removal from wastewater via anaerobic ammonium oxidation (anammox)-based process has been recognized as efficient, cost-effective and low energy alternative to the conventional nitrification and denitrification processes. To date, more than one hundred full-scale anammox plants have been installed and operated for treatment of NH4(+)-rich wastewater streams around the world, and the number is increasing rapidly. Since the discovery of anammox process, extensive researches have been done to develop various anammox-based technologies. However, there are still some challenges in practical application of anammox-based treatment process at full-scale, e.g., longer start-up period, limited application to mainstream municipal wastewater and poor effluent water quality. This paper aimed to summarize recent status of application of anammox process and researches on technological development for solving these remaining problems. In addition, an integrated system of anammox-based process and microbial fuel cell is proposed for sustainable and energy-positive wastewater treatment. Copyright © 2015 Elsevier Ltd. All rights reserved.
Drones for aerodynamic and structural testing /DAST/ - A status report
NASA Technical Reports Server (NTRS)
Murrow, H. N.; Eckstrom, C. V.
1978-01-01
A program for providing research data on aerodynamic loads and active control systems on wings with supercritical airfoils in the transonic speed range is described. Analytical development, wind tunnel tests, and flight tests are included. A Firebee II target drone vehicle has been modified for use as a flight test facility. The program currently includes flight experiments on two aeroelastic research wings. The primary purpose of the first flight experiment is to demonstrate an active control system for flutter suppression on a transport-type wing. Design and fabrication of the wing are complete and after installing research instrumentation and the flutter suppression system, flight testing is expected to begin in early 1979. The experiment on the second research wing - a fuel-conservative transport type - is to demonstrate multiple active control systems including flutter suppression, maneuver load alleviation, gust load alleviation, and reduce static stability. Of special importance for this second experiment is the development and validation of integrated design methods which include the benefits of active controls in the structural design.
Sigrin, Ben; Dietz, Tom; Henry, Adam; Ingle, Aaron; Lutzenhiser, Loren; Moezzi, Mithra; Spielman, Seth; Stern, Paul; Todd, Annika; Tong, James; Wolske, Kim
2017-06-12
This research focused on accelerating solar photovoltaic (PV) diffusion by collecting new market data and developing predictive modeling frameworks to test and refine understandings of household level motivations for adopting solar. Three different household-level surveys were fielded: one for households who had installed PV on their current home or had signed a contract to do so (the Adopter survey), one for households that had seriously considered PV but had not installed it (the Considerer survey), and one for the general population who did not have PV on their current home (the general population survey or GPS). Survey respondents were from four U.S. states: New Jersey, New York, Arizona, and California. Details of recruiting and sampling are documented below. Research projects on residential PV adoption often collect data only from PV adopters or from the general population. One of the innovations of this project was the three-pronged household survey data collection. By collecting similar data from three fairly different "statuses" with respect to adoption, the surveys provide a basis for understanding how those who do not have rooftop PV differ from those who have, for how and why people do (or don't) transition from not having to having rooftop PV on their home, and for understanding the characteristics and viewpoints of households who have scarcely, or not at all, entered the "PV consideration" track. All three surveys covered single-family owner-occupied households in each of the four target states used in the project -- Arizona, California, New Jersey, and New York - allowing a comparative approach to understanding how the factors that affect PV adoption vary by geography and policy conditions. The General Population and Considerer surveys provide a basis for understanding opinions about and interest in solar, and how these relate to household demographics and other conditions. Paired with the Adopter survey, they also provide data for understanding how those who do not have rooftop PV differ from those who have, and for how and why people do (or don't) transition from not having to having rooftop PV on their home. The Adopter survey questions were designed to capture a broad range of information on what motivates and impedes households to install rooftop PV, as well as the details and timing of the decision and installation. Survey instrument development drew from existing PV adoption survey instruments, PV adoption literature, and research team experience, as well as from past work on household interest in energy efficiency, environmental attitudes, purchasing tendencies, and related knowledge. Early interviews and discussions with installers and others in the PV industry were also taken into consideration.
One Year Old and Growing: A Status Report on the International Space Station and Its Partners
NASA Technical Reports Server (NTRS)
Bartoe, John-David F.; Hall, Elizabeth
1999-01-01
The first elements of the International Space Station have been launched and docked together, and are performing well on-orbit. The Station is currently being operated jointly by NASA and Russian space organizations. In May 1999, the Space Shuttle was the first vehicle to dock to the International, Space Station. A crew of seven U.S. and Russian astronauts delivered 4000 pounds of supplies, made repairs to communications and battery systems, and installed external hardware during an EVA. The next module, the Russian Service Module, is due to join the orbital complex this year. This will initiate a period of rapid growth, with new modules and equipment continually added for the next five to six years, through assembly complete. The first crew is scheduled to begin permanent occupation of the International Space Station early next year. Hardware is being developed by Space Station partners and participants around the world and is largely on schedule for launch. Mission control centers are fully functioning in Houston and Moscow, with operations centers in St. Hubert, Darmstadt, Tsukuba, Turino, and Huntsville going on line as they are required. International crews are selected and in training. Coordination efforts continue with each of the five partners and two participants, involving 16 nations. All of them continue to face their own challenges and have achieved their own successes. This paper will discuss the status of the ISS partners and participants, their contributions and accomplished milestones, and upcoming events. It will also give a status report on the developments of the remainder of the ISS modules and components by each partner and participant. The ISS, the largest and most complicated peacetime project in history, is flying, and, with the help of all the ISS members, will continue to grow.
AI mass spectrometers for space shuttle health monitoring
NASA Technical Reports Server (NTRS)
Adams, F. W.
1991-01-01
The facility Hazardous Gas Detection System (HGDS) at Kennedy Space Center (KSC) is a mass spectrometer based gas analyzer. Two instruments make up the HGDS, which is installed in a prime/backup arrangement, with the option of using both analyzers on the same sample line, or on two different lines simultaneously. It is used for monitoring the Shuttle during fuel loading, countdown, and drainback, if necessary. The use of complex instruments, operated over many shifts, has caused problems in tracking the status of the ground support equipment (GSE) and the vehicle. A requirement for overall system reliability has been a major force in the development of Shuttle GSE, and is the ultimate driver in the choice to pursue artificial intelligence (AI) techniques for Shuttle and Advanced Launch System (ALS) mass spectrometer systems. Shuttle applications of AI are detailed.
Endogenous opiates and behavior: 2007.
Bodnar, Richard J
2008-12-01
This paper is the thirtieth consecutive installment of the annual review of research concerning the endogenous opioid system. It summarizes papers published during 2007 that studied the behavioral effects of molecular, pharmacological and genetic manipulation of opioid peptides, opioid receptors, opioid agonists and opioid antagonists. The particular topics that continue to be covered include the molecular-biochemical effects and neurochemical localization studies of endogenous opioids and their receptors related to behavior, and the roles of these opioid peptides and receptors in pain and analgesia; stress and social status; tolerance and dependence; learning and memory; eating and drinking; alcohol and drugs of abuse; sexual activity and hormones, pregnancy, development and endocrinology; mental illness and mood; seizures and neurologic disorders; electrical-related activity and neurophysiology; general activity and locomotion; gastrointestinal, renal and hepatic functions; cardiovascular responses; respiration and thermoregulation; and immunological responses.
Current status of Polish Fireball Network
NASA Astrophysics Data System (ADS)
Wiśniewski, M.; Żołądek, P.; Olech, A.; Tyminski, Z.; Maciejewski, M.; Fietkiewicz, K.; Rudawska, R.; Gozdalski, M.; Gawroński, M. P.; Suchodolski, T.; Myszkiewicz, M.; Stolarz, M.; Polakowski, K.
2017-09-01
The Polish Fireball Network (PFN) is a project to monitor regularly the sky over Poland in order to detect bright fireballs. In 2016 the PFN consisted of 36 continuously active stations with 57 sensitive analogue video cameras and 7 high resolution digital cameras. In our observations we also use spectroscopic and radio techniques. A PyFN software package for trajectory and orbit determination was developed. The PFN project is an example of successful participation of amateur astronomers who can provide valuable scientific data. The network is coordinated by astronomers from Copernicus Astronomical Centre in Warsaw, Poland. In 2011-2015 the PFN cameras recorded 214,936 meteor events. Using the PFN data and the UFOOrbit software 34,609 trajectories and orbits were calculated. In the following years we are planning intensive modernization of the PFN network including installation of dozens of new digital cameras.
The 2005 HST Calibration Workshop Hubble After the Transition to Two-Gyro Mode
NASA Technical Reports Server (NTRS)
Koekemoer, Anton M. (Editor); Goodfrooij, Paul (Editor); Dressel, Linda L. (Editor)
2006-01-01
The 2005 HST Calibration Workshop was held at the Space Telescope Science Institute during October 26, 2005 to bring together members of the observing community, the instrument development teams, and the STScI instrument support teams to share information and techniques. Presentations included the two-gyro performance of HST and FGS, advances in the calibration of a number of instruments, the results of other instruments after their return from space, and the status of still others which are scheduled for installation during the next servicing mission. Cross-calibration between HST and JWST was discussed, as well as the new Guide Star Catalog and advances in data analysis software. This book contains the published record of the workshop, while all the talks and posters are available electronically on the workshop Web site.
NASA Technical Reports Server (NTRS)
Jordan, F. L., Jr.; Mclemore, H. C.; Bragg, M. B.
1978-01-01
The current status of aerial applications technology research at the Langley's Vortex Research Facility and Full-Scale Wind Tunnel is reviewed. Efforts have been directed mainly toward developing and validating the required experimental and theoretical research tools. A capability to simulate aerial dispersal of materials from agricultural airplanes with small-scale airplane models, numerical methods, and dynamically scaled test particles was demonstrated. Tests on wake modification concepts have proved the feasibility of tailoring wake properties aerodynamically to produce favorable changes in deposition and to provide drift control. An aerodynamic evaluation of the Thrush Commander 800 agricultural airplane with various dispersal systems installed is described. A number of modifications intended to provide system improvement to both airplane and dispersal system are examined, and a technique for documenting near-field spray characteristics is evaluated.
The LHC magnet system and its status of development
NASA Technical Reports Server (NTRS)
Bona, Maurizio; Perin, Romeo; Vlogaert, Jos
1995-01-01
CERN is preparing for the construction of a new high energy accelerator/collider, the Large Hadron Collider (LHC). This new facility will mainly consist of two superconducting magnetic beam channels, 27 km long, to be installed in the existing LEP tunnel. The magnetic system comprises about 1200 twin-aperture dipoles, 13.145 m long, with an operational field of 8.65 T, about 600 quadrupoles, 3 m long, and a very large number of other superconducting magnetic components. A general description of the system is given together with the main features of the design of the regular lattice magnets. The paper also describes the present state of the magnet R & D program. Results from short model work, as well as from full scale prototypes will be presented, including the recently tested 10 m long full-scale prototype dipole manufactured in industry.
Status of the SPIRAL2 injector commissioning
NASA Astrophysics Data System (ADS)
Thuillier, T.; Angot, J.; Barué, C.; Bertrand, P.; Biarrotte, J. L.; Canet, C.; Denis, J.-F.; Ferdinand, R.; Flambard, J.-L.; Jacob, J.; Jardin, P.; Lamy, T.; Lemagnen, F.; Maunoury, L.; Osmond, B.; Peaucelle, C.; Roger, A.; Sole, P.; Touzery, R.; Tuske, O.; Uriot, D.
2016-02-01
The SPIRAL2 injector, installed in its tunnel, is currently under commissioning at GANIL, Caen, France. The injector is composed of two low energy beam transport lines: one is dedicated to the light ion beam production, the other to the heavy ions. The first light ion beam, created by a 2.45 GHz electron cyclotron resonance ion source, has been successfully produced in December 2014. The first beam of the PHOENIX V2 18 GHz heavy ion source was analyzed on 10 July 2015. A status of the SPIRAL2 injector commissioning is given. An upgrade of the heavy ion source, named PHOENIX V3 aimed to replace the V2, is presented. The new version features a doubled plasma chamber volume and the high charge state beam intensity is expected to increase by a factor of 1.5 to 2 up to the mass ˜50. A status of its assembly is proposed.
Status of the SPIRAL2 injector commissioning.
Thuillier, T; Angot, J; Barué, C; Bertrand, P; Biarrotte, J L; Canet, C; Denis, J-F; Ferdinand, R; Flambard, J-L; Jacob, J; Jardin, P; Lamy, T; Lemagnen, F; Maunoury, L; Osmond, B; Peaucelle, C; Roger, A; Sole, P; Touzery, R; Tuske, O; Uriot, D
2016-02-01
The SPIRAL2 injector, installed in its tunnel, is currently under commissioning at GANIL, Caen, France. The injector is composed of two low energy beam transport lines: one is dedicated to the light ion beam production, the other to the heavy ions. The first light ion beam, created by a 2.45 GHz electron cyclotron resonance ion source, has been successfully produced in December 2014. The first beam of the PHOENIX V2 18 GHz heavy ion source was analyzed on 10 July 2015. A status of the SPIRAL2 injector commissioning is given. An upgrade of the heavy ion source, named PHOENIX V3 aimed to replace the V2, is presented. The new version features a doubled plasma chamber volume and the high charge state beam intensity is expected to increase by a factor of 1.5 to 2 up to the mass ∼50. A status of its assembly is proposed.
[Interrelation between trophological status and the course of stomach and duodenal ulcer diseases].
Butov, M A; Zhestkova, T V
2014-01-01
There was installed a significant positive relationship between body mass index (BMI) and the velocity of cicatrization of ulcer in patients with ulcer disease (PUD) with trophological violations. Change in the index ratio of lymphocytes and ESR in patients with PUD trophological violations can be used to predict the velocity of cicatrization of ulcer. The general maladjustment more often observed in patients (PUD) underweight.
2010-07-01
tracked Species, Eglin AFB Scientific Name Common Name Status State Federal Fish Acipenser oxyrinchus desotoi Gulf Sturgeon LS LT Awaous banana River...West’s Flax LE - Litsea aestivalis Pondspice LE - Lupinus westianus Gulfcoast Lupine LT - Macranthera flammea Hummingbird Flower LE - Magnolia ashei...Pinguicula primuliflora Primrose- Flowered Butterwort LE - Platanthera integra Southern Yellow Fringeless Orchid LE - Polygonella macrophylla Large-Leaved
The CMS Journey to LHC Physics
Virdee, Tejinder
2018-04-27
An overview of the design, the construction and physics of CMS will be given. A history of construction, encompassing the R&D; and challenges faced over the last decade and a half, will be recalled using selected examples. CMS is currently in the final stages of installation and commissioning is gathering pace. After a short status report of where CMS stands today some of the expected (great) physics to come will be outlined.
Status of the steam generator tube circumferential ODSCC degradation experienced at the Doel 4 plant
DOE Office of Scientific and Technical Information (OSTI.GOV)
Roussel, G.
1997-02-01
Since the 1991 outage, the Doel Unit 4 nuclear power plant is known to be affected by circumferential outside diameter intergranular stress corrosion cracking at the hot leg tube expansion transition. Extensive non destructive examination inspections have shown the number of tubes affected by this problem as well as the size of the cracks to have been increasing for the three cycles up to 1993. As a result of the high percentage of tubes found non acceptable for continued service after the 1993 in-service inspection, about 1,700 mechanical sleeves were installed in the steam generators. During the 1994 outage, allmore » the tubes sleeved during the 1993 outage were considered as potentially cracked to some extent at the upper hydraulic transition and were therefore not acceptable for continued service. They were subsequently repaired by laser welding. Furthermore all the tubes not sleeved during the 1993 outage were considered as not acceptable for continued service and were repaired by installing laser welded sleeves. During the 1995 outage, some unexpected degradation phenomena were evidenced in the sleeved tubes. This paper summarizes the status of the circumferential ODSCC experienced in the SG tubes of the Doel 4 plant as well as the other connected degradation phenomena.« less
24 CFR 3285.902 - Moving manufactured home to location.
Code of Federal Regulations, 2011 CFR
2011-04-01
... 24 Housing and Urban Development 5 2011-04-01 2011-04-01 false Moving manufactured home to... HOUSING AND URBAN DEVELOPMENT MODEL MANUFACTURED HOME INSTALLATION STANDARDS Optional Information for Manufacturer's Installation Instructions § 3285.902 Moving manufactured home to location. It is recommended...
24 CFR 3285.902 - Moving manufactured home to location.
Code of Federal Regulations, 2012 CFR
2012-04-01
... 24 Housing and Urban Development 5 2012-04-01 2012-04-01 false Moving manufactured home to... HOUSING AND URBAN DEVELOPMENT MODEL MANUFACTURED HOME INSTALLATION STANDARDS Optional Information for Manufacturer's Installation Instructions § 3285.902 Moving manufactured home to location. It is recommended...
24 CFR 3285.902 - Moving manufactured home to location.
Code of Federal Regulations, 2010 CFR
2010-04-01
... 24 Housing and Urban Development 5 2010-04-01 2010-04-01 false Moving manufactured home to... HOUSING AND URBAN DEVELOPMENT MODEL MANUFACTURED HOME INSTALLATION STANDARDS Optional Information for Manufacturer's Installation Instructions § 3285.902 Moving manufactured home to location. It is recommended...
24 CFR 3285.902 - Moving manufactured home to location.
Code of Federal Regulations, 2014 CFR
2014-04-01
... 24 Housing and Urban Development 5 2014-04-01 2014-04-01 false Moving manufactured home to... HOUSING AND URBAN DEVELOPMENT MODEL MANUFACTURED HOME INSTALLATION STANDARDS Optional Information for Manufacturer's Installation Instructions § 3285.902 Moving manufactured home to location. It is recommended...
24 CFR 3285.902 - Moving manufactured home to location.
Code of Federal Regulations, 2013 CFR
2013-04-01
... 24 Housing and Urban Development 5 2013-04-01 2013-04-01 false Moving manufactured home to... HOUSING AND URBAN DEVELOPMENT MODEL MANUFACTURED HOME INSTALLATION STANDARDS Optional Information for Manufacturer's Installation Instructions § 3285.902 Moving manufactured home to location. It is recommended...
2007-01-01
software applications and rely on the installations to supply them with the basic I&E geospatial data - sets for those applications. Such...spatial data in geospatially based tools to help track military supplies and materials all over the world. For instance, SDDCTEA developed IRRIS, a...regional offices or individual installations to supply the data and perform QA/QC in the process. The IVT program office worked with the installations and
32 CFR 634.25 - Installation traffic codes.
Code of Federal Regulations, 2013 CFR
2013-07-01
... riding in a POV whether on or off the installation. (iv) Infant/child restraint devices (car seats) will be required in POVs for children 4 years old or under and not exceeding 45 pounds in weight. (v... development and publication of installation traffic codes will be based on the following: (1) Highway Safety...
32 CFR 634.25 - Installation traffic codes.
Code of Federal Regulations, 2012 CFR
2012-07-01
... riding in a POV whether on or off the installation. (iv) Infant/child restraint devices (car seats) will be required in POVs for children 4 years old or under and not exceeding 45 pounds in weight. (v... code of the State or host nation in which the installation is located. In addition, the development and...
32 CFR 634.25 - Installation traffic codes.
Code of Federal Regulations, 2010 CFR
2010-07-01
... riding in a POV whether on or off the installation. (iv) Infant/child restraint devices (car seats) will be required in POVs for children 4 years old or under and not exceeding 45 pounds in weight. (v... code of the State or host nation in which the installation is located. In addition, the development and...
32 CFR 634.25 - Installation traffic codes.
Code of Federal Regulations, 2014 CFR
2014-07-01
... riding in a POV whether on or off the installation. (iv) Infant/child restraint devices (car seats) will be required in POVs for children 4 years old or under and not exceeding 45 pounds in weight. (v... code of the State or host nation in which the installation is located. In addition, the development and...
32 CFR 634.25 - Installation traffic codes.
Code of Federal Regulations, 2011 CFR
2011-07-01
... riding in a POV whether on or off the installation. (iv) Infant/child restraint devices (car seats) will be required in POVs for children 4 years old or under and not exceeding 45 pounds in weight. (v... development and publication of installation traffic codes will be based on the following: (1) Highway Safety...
NEPTUNE Canada-status and planning
NASA Astrophysics Data System (ADS)
Bornhold, Brian D.
2005-04-01
Stage 1 of the joint Canada-U.S. NEPTUNE seafloor observatory has been funded by the Canada Foundation for Innovation and the British Columbia Knowledge Development Fund with an overall budget of $62.4 million. The network is designed to provide as close to real-time data and images as possible to be distributed to the research community, government agencies, educational institutions and the public via the Internet. Covering much of the northern segment of the Juan de Fuca Plate, this first phase of the NEPTUNE project is scheduled to be installed, with an initial suite of ``community experiments'', in 2008. As part of the planning, NEPTUNE Canada held a series of three workshops to develop the science plans for these ``community experiments'' these experiments have a budget of approximately $13 million. The experiments will cover the gamut of oceanographic science themes including various aspects of: ocean climate and marine productivity, seabed environments and biological communities, fluids at ocean ridges, gas hydrates and fluids on continental margins, plate tectonics processes, associated earthquakes and tsunamis. The next three years will be spent developing and testing the necessary instrumentation for deployment on the network.
Carter, D A; Hirst, I L
2000-01-07
This paper considers the application of one of the weighted risk indicators used by the Major Hazards Assessment Unit (MHAU) of the Health and Safety Executive (HSE) in formulating advice to local planning authorities on the siting of new major accident hazard installations. In such cases the primary consideration is to ensure that the proposed installation would not be incompatible with existing developments in the vicinity, as identified by the categorisation of the existing developments and the estimation of individual risk values at those developments. In addition a simple methodology, described here, based on MHAU's "Risk Integral" and a single "worst case" even analysis, is used to enable the societal risk aspects of the hazardous installation to be considered at an early stage of the proposal, and to determine the degree of analysis that will be necessary to enable HSE to give appropriate advice.
2012-11-01
Research , Development, Test , and Evaluation (RDT&E) Appropriations The RDT&E appropriation consists of the mission program budgets for all... research , development, test and evaluation work performed by contractors and government installations and includes an installations and activities budget...than $4,000,000. 9 f. Research , Development, Test , and Evaluation Appropriations The Research , Development, Test , and Evaluation (RDT&E
24 CFR 3285.104 - Moving manufactured home to location.
Code of Federal Regulations, 2013 CFR
2013-04-01
... 24 Housing and Urban Development 5 2013-04-01 2013-04-01 false Moving manufactured home to... HOUSING AND URBAN DEVELOPMENT MODEL MANUFACTURED HOME INSTALLATION STANDARDS Pre-Installation Considerations § 3285.104 Moving manufactured home to location. Refer to § 3285.902 for considerations related to...
24 CFR 3285.104 - Moving manufactured home to location.
Code of Federal Regulations, 2011 CFR
2011-04-01
... 24 Housing and Urban Development 5 2011-04-01 2011-04-01 false Moving manufactured home to... HOUSING AND URBAN DEVELOPMENT MODEL MANUFACTURED HOME INSTALLATION STANDARDS Pre-Installation Considerations § 3285.104 Moving manufactured home to location. Refer to § 3285.902 for considerations related to...
24 CFR 3285.104 - Moving manufactured home to location.
Code of Federal Regulations, 2014 CFR
2014-04-01
... 24 Housing and Urban Development 5 2014-04-01 2014-04-01 false Moving manufactured home to... HOUSING AND URBAN DEVELOPMENT MODEL MANUFACTURED HOME INSTALLATION STANDARDS Pre-Installation Considerations § 3285.104 Moving manufactured home to location. Refer to § 3285.902 for considerations related to...
24 CFR 3285.104 - Moving manufactured home to location.
Code of Federal Regulations, 2012 CFR
2012-04-01
... 24 Housing and Urban Development 5 2012-04-01 2012-04-01 false Moving manufactured home to... HOUSING AND URBAN DEVELOPMENT MODEL MANUFACTURED HOME INSTALLATION STANDARDS Pre-Installation Considerations § 3285.104 Moving manufactured home to location. Refer to § 3285.902 for considerations related to...
24 CFR 3285.104 - Moving manufactured home to location.
Code of Federal Regulations, 2010 CFR
2010-04-01
... 24 Housing and Urban Development 5 2010-04-01 2010-04-01 false Moving manufactured home to... HOUSING AND URBAN DEVELOPMENT MODEL MANUFACTURED HOME INSTALLATION STANDARDS Pre-Installation Considerations § 3285.104 Moving manufactured home to location. Refer to § 3285.902 for considerations related to...
24 CFR 3285.101 - Fire separation.
Code of Federal Regulations, 2010 CFR
2010-04-01
... 24 Housing and Urban Development 5 2010-04-01 2010-04-01 false Fire separation. 3285.101 Section... DEVELOPMENT MODEL MANUFACTURED HOME INSTALLATION STANDARDS Pre-Installation Considerations § 3285.101 Fire separation. Fire separation distances must be in accordance with the requirements of Chapter 6 of NFPA 501A...
Large Synoptic Survey Telescope mount final design
NASA Astrophysics Data System (ADS)
Callahan, Shawn; Gressler, William; Thomas, Sandrine J.; Gessner, Chuck; Warner, Mike; Barr, Jeff; Lotz, Paul J.; Schumacher, German; Wiecha, Oliver; Angeli, George; Andrew, John; Claver, Chuck; Schoening, Bill; Sebag, Jacques; Krabbendam, Victor; Neill, Doug; Hileman, Ed; Muller, Gary; Araujo, Constanza; Orden Martinez, Alfredo; Perezagua Aguado, Manuel; García-Marchena, Luis; Ruiz de Argandoña, Ismael; Romero, Francisco M.; Rodríguez, Ricardo; Carlos González, José; Venturini, Marco
2016-08-01
This paper describes the status and details of the large synoptic survey telescope1,2,3 mount assembly (TMA). On June 9th, 2014 the contract for the design and build of the large synoptic survey telescope mount assembly (TMA) was awarded to GHESA Ingeniería y Tecnología, S.A. and Asturfeito, S.A. The design successfully passed the preliminary design review on October 2, 2015 and the final design review January 29, 2016. This paper describes the detailed design by subsystem, analytical model results, preparations being taken to complete the fabrication, and the transportation and installation plans to install the mount on Cerro Pachón in Chile. This large project is the culmination of work by many people and the authors would like to thank everyone that has contributed to the success of this project.
STS-121: Discovery L-2 Countdown Status Briefing
NASA Technical Reports Server (NTRS)
2006-01-01
Bruce Buckingham from NASA Public Affairs introduces Pete Nicolenko, NASA Test Director, and Kathy Winters, Shuttle Weather Officer. During this STS-121 two days before launch countdown briefing, Pete Nicolenko says that there are no issues of concern and that they are on schedule for launch. He then presents and discusses an Orbiter Processing Facility (OPF) video. The OPF topics of discussion include: 1) Wheel and tire installation; 2) Gap filler installation; 3) Booster build-up; 4) Transport of External Tank (ET) 119; 5) ET to Shuttle Rocket Booster (SRB) Mate operation; 6) Roll-over of Discovery out of OPF to the Vehicle Assembly Building (VAB); and 7) Roll-out to the pad. Kathy Winters gives her weather forecast for the STS-121 launch. The video ends with a question and answer period from the media.
Lopez-Piriz, Roberto; Giménez, Maria J.; Bowen, Antonio; Carroquino, Rafael; Aguilar, Lorenzo; Corral, Ignacio; del Val, Cora; González, Inmaculada; Ilzarbe, Luis M.; Maestre, Juan R.; Padullés, Esteban; Torres-Lear, Francisco; Granizo, Juan J.; San-Román, Fide; Hernández, Sofía; Prieto, José
2012-01-01
Objectives: To explore periimplant health (and relation with periodontal status) 4-5 years after implant insertion. Study Design: A practice-based dental research network multicentre study was performed in 11 Spanish centres. The first patient/month with implant insertion in 2004 was considered. Per patient four teeth (one per quadrant) showing the highest bone loss in the 2004 panoramic X-ray were selected for periodontal status assessment. Bone losses in implants were calculated as the differences between 2004 and 2009 bone levels in radiographs. Results: A total of 117 patients were included. Of the 408 teeth considered, 73 (17.9%) were lost in 2009 (losing risk: >50% for bone losses ≥7mm). A total of 295 implants were reviewed. Eight of 117 (6.8%) patients had lost implants (13 of 295 implants installed; 4.4%). Implant loss rate (quadrant status) was 1.4% (edentulous), 3.6% (preserved teeth), and 11.1% (lost teeth) (p=0.037). The percentage of implant loss significantly (p<0.001) increased when the medial/distal bone loss was ≥3 mm. The highest (p≤0.001) pocket depths were found in teeth with ≥5mm and implants with ≥3mm bone losses, with similar mean values (≥4mm), associated with higher rates of plaque index and bleeding by probing. Conclusions: The significant bi-directional relation between plaque and bone loss, and between each of these two parameters/signs and pocket depths or bleeding (both in teeth and implants, and between them) together with the higher percentage of implants lost when the bone loss of the associated teeth was ≥3 mm suggest that the patient’s periodontal status is a critical issue in predicting implant health/lesion. Key words:Implants, periimplantitis, periodontitis, oral health, practice-based research PMID:22549681
NASA Astrophysics Data System (ADS)
Manik, T.; Sitompul, P.; Batubara, M.; Harjana, T.; Yatini, C. Y.; Monstein, C.
2016-04-01
Sumedang Observatory (6.91°S, 107,84°E) was established in 1975 and is one of the solar observation facilities of the Space Science Center of Indonesian National Institute of Aeronautics and Space (LAPAN), located around 40 km, east part of Bandung City, West Java, Indonesia. Several instrumentations for solar and space observation such as optical telescopes, radio solar spectrograph, flux gate magnetometer, etc. are operated there, together with an ionosphere sounding system (ionosonde) that was set up later. In July 2014, a standard Callisto (Compound Astronomical Low-cost Low-frequency Instrument for Spectroscopy and Transportable Observatory) spectrometer was installed at Sumedang Observatory for solar radio activity monitoring. Callisto has been developed in the framework of IHY2007 and ISWI, supported by UN and NASA. Callisto spectrometer has observation capability in the frequency range of 45-870 MHz. The Callisto spectrometer receives signal by using a set of 21 elements log-periodic antenna, model CLP5130-1N, pointed to the Sun and equipped with a low noise pre-amplifier. With respect to the Radio Frequency Interferences (RFI) measurements, the Callisto spectrometer is operated individually in frequency ranges of 45-80 MHz and 180-450 MHz. Observation status and data flow are monitored in on-line from center office located in Bandung. The data was transferred to central database at FHNW (Fachhochschule Nordwestschweiz) server every 15 minutes to appear on e-Callisto network subsequently. A real time data transfer and data processing based on Python software also has been developed successfully to be used as an input for Space Weather Information and Forecasting Services (SWIFtS) provided by LAPAN. On 5th November 2014, Callisto spectrometer at Sumedang observed the first clear solar radio event, a solar radio burst type II corresponding to a coronal mass ejection (CME), indicated by a strong X-ray event of M7.9 that was informed on by Space Weather Prediction Center (SWPC) NOAA. Thereafter, Callisto spectrometer at Sumedang also observed several solar radio bursts in various types. This paper describes the system configuration of Callisto spectrometer installed at Sumedang, RFI measurement and chosen observation strategy, real time data transfer and processing, as well as several samples of present results of solar radio burst monitoring at Sumedang, and future development plan of Callisto spectrometer in Indonesia which will be able to cover 14 hours of day solar observation. Keywords: Callisto spectrometer, solar radio observation, SWIFtS.
2016 State of Wind Development in the United States by Region
DOE Office of Scientific and Technical Information (OSTI.GOV)
Baranowski, Ruth; Oteri, Frank; Baring-Gould, Ian
Significant expansion of wind energy development will be required to achieve the scenarios outlined in the U.S. Department of Energy's (DOE)'s Wind Vision: 20% wind energy by 2030 and 35% wind energy by 2050. Wind energy currently provides nearly 5% of the nation's electricity but has the potential to provide much more. The wind industry and the DOE's Wind Energy Technologies Office are addressing technical wind energy challenges, such as reducing turbine costs and increasing energy production and reliability. The Office recognizes that public acceptance of wind energy can be challenging, depending on the proximity of proposed wind farms tomore » local populations. Informed decision makers and communities equipped with unbiased information about the benefits and impacts of wind energy development are better prepared to navigate the sometimes contentious development process. In 2014, DOE established six Regional Resource Centers (RRCs) across the United States to communicate unbiased, credible information about wind energy to stakeholders through regional networks. The RRCs provide ready access to this information to familiarize the public with wind energy; raise awareness about potential benefits and issues; and disseminate data on siting considerations such as turbine sound and wildlife habitat protection. This document summarizes the status and drivers for U.S. wind energy development during 2016. RRC leaders provided a report of wind energy development in their regions, which was combined with findings from National Renewable Energy Laboratory (NREL) researchers to provide an account of the state of the regions, as well as updates on developments in individual states. NREL researchers and state partners added updates for all states that are not directly supported by an RRC. Accounts for each region include updates on renewable portfolio standards, the Clean Power Plan, workforce development, manufacturing and economic development, and individual state updates for installed wind capacity, ongoing policy developments, planned projects and their status, transmission progress reports, etc. This report also highlights the efforts of the RRCs to engage stakeholders in their individual regions.« less
Learning to build large structures in space
NASA Technical Reports Server (NTRS)
Hagler, T.; Patterson, H. G.; Nathan, C. A.
1977-01-01
The paper examines some of the key technologies and forms of construction know-how that will have to be developed and tested for eventual application to building large structures in space. Construction of a shuttle-tended space construction/demonstration platform would comprehensively demonstrate large structure technology, develop construction capability, and furnish a construction platform for a variety of operational large structures. Completion of this platform would lead to demonstrations of the Satellite Power System (SPS) concept, including microwave transmission, fabrication of 20-m-deep beams, conductor installation, rotary joint installation, and solar blanket installation.
Code of Federal Regulations, 2011 CFR
2011-10-01
... planning, design, development, installation or enhancement of a computerized support enforcement system as... APD approved by the Office; and (6) The State or local government has ownership rights in software, software modifications and associated documentation that is designed, developed, installed, or enhanced...
24 CFR 3285.204 - Ground moisture control.
Code of Federal Regulations, 2011 CFR
2011-04-01
... 24 Housing and Urban Development 5 2011-04-01 2011-04-01 false Ground moisture control. 3285.204... URBAN DEVELOPMENT MODEL MANUFACTURED HOME INSTALLATION STANDARDS Site Preparation § 3285.204 Ground... materials, a vapor retarder must be installed to cover the ground under the home, unless the home is...
24 CFR 3285.204 - Ground moisture control.
Code of Federal Regulations, 2010 CFR
2010-04-01
... 24 Housing and Urban Development 5 2010-04-01 2010-04-01 false Ground moisture control. 3285.204... URBAN DEVELOPMENT MODEL MANUFACTURED HOME INSTALLATION STANDARDS Site Preparation § 3285.204 Ground... materials, a vapor retarder must be installed to cover the ground under the home, unless the home is...
Some Problems Involved in the Installation of Advanced Information Systems in Developing Countries.
ERIC Educational Resources Information Center
Robredo, Jaime; And Others
For over 30 years the installation of information systems has been promoted in developing nations by international organizations and international consultancies in order to transfer technical expertise from the industrialized countries to the Third World. While some have questioned the value of indiscriminately transferring scientific and…
Approaches and challenges of soil water monitoring in an irrigated vineyard
NASA Astrophysics Data System (ADS)
Nolz, Reinhard; Loiskandl, Willibald
2016-04-01
Monitoring of water content is an approved method to quantify certain components of the soil water balance, for example as basis for hydrological studies and soil water management. Temporal soil water data also allow controlling water status by means of demand-oriented irrigation. Regarding spatial variability of water content due to soil characteristics, plant water uptake and other non-uniformities, it is a great challenge to select a location that is most likely representing soil water status of a larger area (e.g. an irrigated field). Although such an approach might not satisfy the requirements of precision farming - which becomes more and more related to industrial agriculture - it can help improving water use efficiency of small-scale farming. In this regard, specific conditions can be found in typical vineyards in the eastern part of Austria, where grapes are grown for high quality wine production. Generally, the local dry-subhumid climate supports grape development. However, irrigation is temporarily essential in order to guarantee stable yields and high quality. As the local winegrowers traditionally control irrigation based on their experience, there is a potential to improve irrigation management by means of soil water data. In order to gain experience with regard to irrigation management, soil water status was determined in a small vineyard in Austria (47°48'16'' N, 17°01'57'' E, 118 m elevation). The vineyard was equipped with a subsurface drip irrigation system and access tubes for measuring water content in soil profiles. The latter was measured using a portable device as well as permanently installed multi-sensor capacitance probes. Soil samples were taken at chosen dates and gravimetrically analyzed in the laboratory. Water content data were analyzed using simple statistical procedures and the temporal stability concept. Soil water content was interpreted considering different environmental conditions, including rainfall and irrigation periods, and influences from tillage operations. Variability of sensor readings was substantial across the study plot. However, locations could be identified that were most likely representative for soil water monitoring. Tillage operations and weed growth in the inter-rows had a recognizable impact on soil water distribution, which also has to be considered when installing probes. Furthermore, the distance of sensors to drip emitters was of great importance for correctly interpreting data for irrigation management.
NASA Astrophysics Data System (ADS)
Xu, Chong-Yao; Zheng, Xin; Xiong, Xiao-Ming
2017-02-01
With the development of Internet of Things (IoT) and the popularity of intelligent mobile terminals, smart home system has come into people’s vision. However, due to the high cost, complex installation and inconvenience, as well as network security issues, smart home system has not been popularized. In this paper, combined with Wi-Fi technology, Android system, cloud server and SSL security protocol, a new set of smart home system is designed, with low cost, easy operation, high security and stability. The system consists of Wi-Fi smart node (WSN), Android client and cloud server. In order to reduce system cost and complexity of the installation, each Wi-Fi transceiver, appliance control logic and data conversion in the WSN is setup by a single chip. In addition, all the data of the WSN can be uploaded to the server through the home router, without having to transit through the gateway. All the appliance status information and environmental information are preserved in the cloud server. Furthermore, to ensure the security of information, the Secure Sockets Layer (SSL) protocol is used in the WSN communication with the server. What’s more, to improve the comfort and simplify the operation, Android client is designed with room pattern to control home appliances more realistic, and more convenient.
Smart home in a box: usability study for a large scale self-installation of smart home technologies.
Hu, Yang; Tilke, Dominique; Adams, Taylor; Crandall, Aaron S; Cook, Diane J; Schmitter-Edgecombe, Maureen
2016-07-01
This study evaluates the ability of users to self-install a smart home in a box (SHiB) intended for use by a senior population. SHiB is a ubiquitous system, developed by the Washington State University Center for Advanced Studies in Adaptive Systems (CASAS). Participants involved in this study are from the greater Palouse region of Washington State, and there are 13 participants in the study with an average age of 69.23. The SHiB package, which included several different types of components to collect and transmit sensor data, was given to participants to self-install. After installation of the SHiB, the participants were visited by researchers for a check of the installation. The researchers evaluated how well the sensors were installed and asked the resident questions about the installation process to help improve the SHiB design. The results indicate strengths and weaknesses of the SHiB design. Indoor motion tracking sensors are installed with high success rate, low installation success rate was found for door sensors and setting up the Internet server.
Smart home in a box: usability study for a large scale self-installation of smart home technologies
Hu, Yang; Tilke, Dominique; Adams, Taylor; Crandall, Aaron S.; Schmitter-Edgecombe, Maureen
2017-01-01
This study evaluates the ability of users to self-install a smart home in a box (SHiB) intended for use by a senior population. SHiB is a ubiquitous system, developed by the Washington State University Center for Advanced Studies in Adaptive Systems (CASAS). Participants involved in this study are from the greater Palouse region of Washington State, and there are 13 participants in the study with an average age of 69.23. The SHiB package, which included several different types of components to collect and transmit sensor data, was given to participants to self-install. After installation of the SHiB, the participants were visited by researchers for a check of the installation. The researchers evaluated how well the sensors were installed and asked the resident questions about the installation process to help improve the SHiB design. The results indicate strengths and weaknesses of the SHiB design. Indoor motion tracking sensors are installed with high success rate, low installation success rate was found for door sensors and setting up the Internet server. PMID:28936390
Case report: silicatosis in a carpet installer.
Szeinuk, Jaime; Wilk-Rivard, Elizabeth J
2007-06-01
Chronic exposure to talc in the course of carpet installation can result in pneumoconiosis. We present a case of a young carpet installer who was diagnosed with silicatosis of the lung. Review of occupational history revealed that the patient had been working as a carpet installer for approximately 15 years, since he was 15 years of age. The patient was exposed to talc in the course of his work. Exposure to talc in the course of carpet installation has not been reported as a possible cause of pneumoconiosis. In this article we review different causes of silicatosis and discuss chronic exposure in the course of carpet installation and development of pneumoconiosis. In addition, we also review the relevance of mycobacterial infection in cases of silicosis and silicatosis. Exposure to talc in the course of carpet installation should be added to conditions that can cause pneumoconioses, specifically silicatosis of the lung.
DoD Traffic Safety Program. Change 1
2010-04-02
powered and non-powered scooters, skateboards, roller skates , in- line skates , and other similar equipment not meeting DOT motor vehicle standards for...DoD civilian personnel in a duty status, on or off a DoD installation. d. All persons in or on a Government-owned or -leased motor vehicle...Glossary. 4. POLICY. It is DoD policy to: a. Eliminate motor vehicle-related mishaps and the resulting deaths, injuries, and property damage
Federal Register 2010, 2011, 2012, 2013, 2014
2010-03-08
...The FAA invites public comments about our intention to request the Office of Management and Budget (OMB) to approve a current information collection. The date of manufacture and compliance status stamped on a nameplate of each turbojet engine permits rapid determination by FAA inspectors, owners, and operators whether an engine can legally be installed and operated on an aircraft in the United States.
Status of Net Metering: Assessing the Potential to Reach Program Caps
DOE Office of Scientific and Technical Information (OSTI.GOV)
Heeter, J.; Gelman, R.; Bird, L.
2014-09-01
Several states are addressing the issue of net metering program caps, which limit the total amount of net metered generating capacity that can be installed in a state or utility service territory. In this analysis, we examine net metering caps to gain perspective on how long net metering will be available in various jurisdictions under current policies. We also surveyed state practices and experience to understand important policy design considerations.
8TH International Laser Physics Workshop Lphys Budapest, July 2-6, 1999, Program
1999-07-05
Gerhard J. MUller (Germany) Rudolf Steiner (Germany) Symposium Status and Future Directions of High-Power Laser Installations Co-Chairs: See Leang...Sciences, Kazan. Russia I.A. Shcherbakov General Physics Institute. Russian Academy of Sciences. Moscow, Russia R. Steiner Institute of Laser Technologies...14.50-15.15 R. Steiner , A. Pohl, A. Bentele, T. Meier (Ulm, Germany) Laser Doppler sensor for laser assisted injection 30 SEMINAR 5 --- LASER METHODS IN
24 CFR 3285.701 - Electrical crossovers.
Code of Federal Regulations, 2010 CFR
2010-04-01
... URBAN DEVELOPMENT MODEL MANUFACTURED HOME INSTALLATION STANDARDS Electrical Systems and Equipment § 3285.701 Electrical crossovers. Multi-section homes with electrical wiring in more than one section require... installation instructions. ...
Residential Central Air Conditioning and Heat Pump Installation – Workshop Outcomes
DOE Office of Scientific and Technical Information (OSTI.GOV)
Goetzler, William; Zogg, Robert; Young, Jim
DOE's Building Technologies Office works with researchers and industry partners to develop and deploy technologies that can substantially reduce energy consumption in residential and commercial buildings. This report aims to advance BTO’s energy savings, emissions reduction, and other program goals by identifying research and development (R&D), demonstration and deployment, and other non-regulatory initiatives for improving the design and installation of residential central air conditioners (CAC) and central heat pumps (CHP). Improving the adoption of CAC/CHP design and installation best practices has significant potential to reduce equipment costs, improve indoor air quality and comfort, improve system performance, and most importantly, reducemore » household energy consumption and costs for heating and cooling by addressing a variety of common installation issues.« less
Increasing smoke alarm operability through theory-based health education: a randomised trial
Miller, Ted R; Bergen, Gwen; Ballesteros, Michael F; Bhattacharya, Soma; Gielen, Andrea Carlson; Sheppard, Monique S
2015-01-01
Background Although working smoke alarms halve deaths in residential fires, many households do not keep alarms operational. We tested whether theory-based education increases alarm operability. Methods Randomised multiarm trial, with a single arm randomly selected for use each day, in low-income neighbourhoods in Maryland, USA. Intervention arms: (1) Full Education combining a health belief module with a social-cognitive theory module that provided hands-on practice installing alarm batteries and using the alarm’s hush button; (2) Hands-on Practice social-cognitive module supplemented by typical fire department education; (3) Current Norm receiving typical fire department education only. Four hundred and thirty-six homes recruited through churches or by knocking on doors in 2005–2008. Followup visits checked alarm operability in 370 homes (85%) 1–3.5 years after installation. Main outcome measures: number of homes with working alarms defined as alarms with working batteries or hard-wired and number of working alarms per home. Regressions controlled for alarm status preintervention; demographics and beliefs about fire risks and alarm effectiveness. Results Homes in the Full Education and Practice arms were more likely to have a functioning smoke alarm at follow-up (OR=2.77, 95% CI 1.09 to 7.03) and had an average of 0.32 more working alarms per home (95% CI 0.09 to 0.56). Working alarms per home rose 16%. Full Education and Practice had similar effectiveness (p=0.97 on both outcome measures). Conclusions Without exceeding typical fire department installation time, installers can achieve greater smoke alarm operability. Hands-on practice is key. Two years after installation, for every three homes that received hands-on practice, one had an additional working alarm. Trial registration number http://www.clinicaltrials.gov number NCT00139126. PMID:25165090
Cell dynamic morphology classification using deep convolutional neural networks.
Li, Heng; Pang, Fengqian; Shi, Yonggang; Liu, Zhiwen
2018-05-15
Cell morphology is often used as a proxy measurement of cell status to understand cell physiology. Hence, interpretation of cell dynamic morphology is a meaningful task in biomedical research. Inspired by the recent success of deep learning, we here explore the application of convolutional neural networks (CNNs) to cell dynamic morphology classification. An innovative strategy for the implementation of CNNs is introduced in this study. Mouse lymphocytes were collected to observe the dynamic morphology, and two datasets were thus set up to investigate the performances of CNNs. Considering the installation of deep learning, the classification problem was simplified from video data to image data, and was then solved by CNNs in a self-taught manner with the generated image data. CNNs were separately performed in three installation scenarios and compared with existing methods. Experimental results demonstrated the potential of CNNs in cell dynamic morphology classification, and validated the effectiveness of the proposed strategy. CNNs were successfully applied to the classification problem, and outperformed the existing methods in the classification accuracy. For the installation of CNNs, transfer learning was proved to be a promising scheme. © 2018 International Society for Advancement of Cytometry. © 2018 International Society for Advancement of Cytometry.
PBO Facility Construction: Basin and Range and Rocky Mountain Regions Status
NASA Astrophysics Data System (ADS)
Friesen, B.; Jenkins, F.; Kasmer, D.; Feaux, K.
2007-12-01
The Plate Boundary Observatory (PBO), part of the larger NSF-funded EarthScope project, will study the three- dimensional strain field resulting from active plate boundary deformation across the western United States. PBO is a large construction project involving the reconnaissance, permitting, installation, documentation, and maintenance of 875 permanent GPS stations in five years. 163 of these stations lie within the Basin and Range and Rocky Mountain Regions consisting of the states of Montana, Idaho, Nevada, Utah, Wyoming, Colorado, New Mexico, and Arizona. During the fourth year of the project, the Basin and Range and Rocky Mountain regions of PBO completed reconnaissance and nearly all permitting activities, and maintained a fast pace of station installations. The fall of 2006 and spring of 2007 were devoted to the construction of a large push of 50 stations, most located on Bureau of Land Management controlled public lands in Nevada. This transect is located along Highway 50 and will profile the extension of the Basin and Range province. The Yellowstone area, including surrounding National Parks and Forests was the target of summer 2007, during which time 10 remote stations with difficult logistics were installed. To date, construction is complete for 135 of 163 GPS stations.
Clinical and biological analysis in graftless maxillary sinus lift
2017-01-01
Maxillary sinus lift for dental implant installation is a well-known and versatile technique; new techniques are presented based on the physiology of intrasinus bone repair. The aim of this review was to determine the status of graftless maxillary sinus lift and analyze its foundations and results. A search was conducted of the literature between 1995 and 2015 in the Medline, ScienceDirect, and SciELO databases using the keywords “maxillary sinus lift,” “blood clot,” “graftless maxillary sinus augmentation,” and “dental implant placement.” Ten articles were selected for our analysis of this technique and its results. Despite the limited information, cases that were followed for at least six months and up to four years had a 90% success rate. Published techniques included a lateral window, elevation of the sinus membrane, drilling and dental implant installation, descent of the membrane with variations in the installation of the lateral wall access and suturing. The physiology behind this new bone formation response and the results of the present research were also discussed. We concluded that this is a promising and viable technique under certain inclusion criteria. PMID:28875135
Duke storage rink UV/VUV FEL: Status and prospects
DOE Office of Scientific and Technical Information (OSTI.GOV)
Litvinenko, V.N.; Burnham, B.; Madey, J.M.J.
1995-12-31
The 1 GeV Duke storage ring was successfully commissioned with parameters exceeding initial specification. The OK-4 FEL has arrived at the Duke FEL laboratory from the Novosibirsk Institute of Nuclear Physics. The OK-4 installation and commissioning is in progress. In this paper we describe the up-to-date status of the Duke storage ring and the OK-4 FEL. The projected performance of the OK-4 UV/VUV FEL is presented based on the electron beam parameters achieved. Initial plans to operate the OK-4 UV/VUV FEL at the Duke 1 GeV storage ring are outlined. Future plans and prospects of both the OK-4 FEL andmore » the Duke storage ring are discussed.« less
Philippines TCCON Project: Installation, Operation, and Comparisons with GOSAT and OCO-2 Data
NASA Astrophysics Data System (ADS)
Morino, I.; Velazco, V. A.; Hori, A.; Uchino, O.; Sakai, T.; Izumi, T.; Nagai, T.; Bagtasa, G.; Yoshida, Y.; Kiel, M.; Bukosa, B.; Deutscher, N. M.; Fisher, J. A.; Griffith, D. W. T.
2017-12-01
TCCON is dedicated to the precise measurements of greenhouse gases (GHGs) such as CO2 and CH4. TCCON measurements have been and are currently used extensively and globally for satellite validation, for comparison with atmospheric chemistry models and to study atmosphere-biosphere exchanges of carbon. With the global effort to cap GHG emissions, TCCON has taken on a vital role in validating satellite-based GHG data from past, current and future missions like Japanese GOSAT and GOSAT-2, NASA's OCO-2 and OCO-3, Chinese TanSat, TROPOMI, and others. The lack of reliable validation data for the satellite-based GHG observing missions in the tropical regions is a common limitation in global carbon-cycle modeling studies that have a tropical component. The international CO2 modeling community has specified a requirement for "expansion of the CO2 observation network within the tropics" to reduce uncertainties in regional estimates of CO2sources and sinks using atmospheric transport models. To address this challenge, we installed a newly-constructed TCCON FTS at a wind farm operated by the Energy Development Corporation in Burgos, Ilocos Norte, Philippines (18.5326° N, 120.6496° E), which followed rigorous site assessments and discussions at several TCCON and GOSAT-2 science team meetings. After developing the TCCON instrument and characterizing its performance at the NIES in Japan, we deployed the TCCON FTS at the Burgos site in Dec. 2016. Installation and set up of the instruments were concluded in Mar. 2017, followed by first measurements of solar absorption spectra and continued operations in the Philippines using TCCON protocols. Here, we will show obvious CO2, CH4and CO enhancements were observed in Mar. 2017, accompanied by clear depolarization signals from a LIDAR instrument. These enhancements are probably caused by outflow of pollution from major cities in China but the emissions are underestimated in the GEOS-Chem model. Comparisons with GOSAT and OCO-2 soundings will also be shown. The Burgos site has been approved as an official TCCON site with a provisional status at the last TCCON meeting in Jun. 2017.
VEGA, the European small launcher: Development status, future perspectives, and applications
NASA Astrophysics Data System (ADS)
Bianchi, Stefano; VEGA Integrated Project Team (IPT)
2008-07-01
This paper presents a technical and programmatic overview of the VEGA launch system program currently in development for the European Space Agency, which includes the development and qualification activities of the small launcher VEGA, of the ground infrastructure, and of all the launcher elements. Several programmatic milestones have been successfully achieved so far: most subsystems have gone through the critical design review or qualification review. The launcher system critical design review has been performed during spring 2007 as well. Concerning propulsion, all the three development models of the solid rocket motors have been successfully tested between December 2005 and December 2006. The first qualification model engine of the liquid propulsion upper module has successfully completed its firing campaign and the test campaign for the second model has just started. The liquid upper stage AVUM engine has been tested as well. The VEGA ground segment program has entered its final lapse by completing the detailed design of the various subsystems. The installation phase in the launch range site (Kourou, French Guyane) is in full swing. The integration of the Mobile Gantry, necessary to integrate the launcher, is almost completed as for the main structure.
NASA Technical Reports Server (NTRS)
Morel, T.; Kerlbar, R.; Fort, E. F.; Blumberg, P. N.
1985-01-01
This report describes work done during Phase 2 of a 3 year program aimed at developing a comprehensive heat transfer and thermal analysis methodology for design analysis of insulated diesel engines. The overall program addresses all the key heat transfer issues: (1) spatially and time-resolved convective and radiative in-cylinder heat transfer, (2) steady-state conduction in the overall structure, and (3) cyclical and load/speed temperature transients in the engine structure. During Phase 2, radiation heat transfer model was developed, which accounts for soot formation and burn up. A methodology was developed for carrying out the multi-dimensional finite-element heat conduction calculations within the framework of thermodynamic cycle codes. Studies were carried out using the integrated methodology to address key issues in low heat rejection engines. A wide ranging design analysis matrix was covered, including a variety of insulation strategies, recovery devices and base engine configurations. A single cylinder Cummins engine was installed at Purdue University, and it was brought to a full operational status. The development of instrumentation was continued, concentrating on radiation heat flux detector, total heat flux probe, and accurate pressure-crank angle data acquisition.
NASA Astrophysics Data System (ADS)
Kim, Hee-Joung
2002-05-01
PACS industry in Korea has been rapidly growing, since government had supported collaborative PACS project between industry and university hospital. In the beginning, PACS industry had focused on developing peripheral PACS solutions, while the Korea PACS society was being formed. A few companies had started developing and installing domestic large-scale full-PACS system for teaching hospitals. Several years later, many hospitals have installed full-PACS system with national policy of reimbursement for PACS exams in November 1999. Both experiences of full-PACS installation and national policy generated tremendous intellectual and technological expertise about PACS at all levels, clinical, hospital management, education, and industrial sectors. There are now more than 20 domestic PACS companies. They have enough experiences which are capable of installing a truly full-PACS system for large-scale teaching hospitals. As an example, a domestic company had installed more than 40 full-PACS systems within 2-3 years. Enough experiences of full-PACS installation in Korea lead PACS industry to start exporting their full-PACS solutions. However, further understanding and timely implementation of continuously evolving international standard and integrated healthcare enterprise concepts may be necessary for international leading of PACS technologies for the future.
An Evaluation of Installation Methods for STS-1 Seismometers
Holcomb, L. Gary; Hutt, Charles R.
1992-01-01
INTRODUCTION This report documents the results of a series of experiments conducted by the authors at the Albuquerque Seismological Laboratory (ASl) during the spring and summer of 1991; the object of these experiments was to obtain and document quantitative performance comparisons of three methods of installing STS-1 seismometers. Historically, ASL has installed STS-1 sensors by cementing their thick glass base plates to the concrete floor of the vault (see Peterson and Tilgner, 1985, p 44 and Figure 31, p 51 for the details of this installation technique). This installation technique proved to be fairly satisfactory for the China Digital Seismic Network and for several sets of STS-1 sensors installed in other locations since that time. However, the cementing operation is rather labor intensive and the concrete requires a lengthy (about 1 week) curing time during which the sensor installed on it is noisy. In addition it is difficult to assure that all air bubbles have been removed from the interface between the cement and the glass base plate. If air bubbles are present beneath the plate, horizontal sensors can be unacceptably noisy. Moving a sensor installed in this manner requires the purchase of a new glass base plate because the old plate normally can not be removed without breakage. Therefore, this study was undertaken with the aim of developing an improved method of installing STS-1's. The goals were to develop a method which requires less field site labor during the installation and assures a higher quality installation when finished. In addition, the improved installation technique should promote portability. Two alternate installation techniques were evaluated in this study. One method replaces the cement between the base plate and the vault floor with sand. This method has been used in the French Geoscope program and in several IRIS/IDA installations made by the University of California at San Diego (UCSD) and possibly others. It is easily implemented in the field and is quite cheap. The other method utilizes a so called warpless housing designed by E. Wielandt and implemented at ASL. This housing is quite similar to the case design of the STS-2 sensor system. It is designed to minimize the effects of atmospheric pressure variations on the sealed housing.
Environmental Factor(tm) system: RCRA hazardous waste handler information (on cd-rom). Database
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1996-04-01
Environmental Factor(tm) RCRA Hazardous Waste Handler Information on CD-ROM unleashes the invaluable information found in two key EPA data sources on hazardous waste handlers and offers cradle-to-grave waste tracking. It`s easy to search and display: (1) Permit status, design capacity and compliance history for facilities found in the EPA Resource Conservation and Recovery Information System (RCRIS) program tracking database; (2) Detailed information on hazardous wastes generation, management and minimization by companies who are large quantity generators, and (3) Data on the waste management practices of treatment, storage and disposal (TSD) facilities from the EPA Biennial Reporting System which is collectedmore » every other year. Environmental Factor`s powerful database retrieval system lets you: (1) Search for RCRA facilities by permit type, SIC code, waste codes, corrective action or violation information, TSD status, generator and transporter status and more; (2) View compliance information - dates of evaluation, violation, enforcement and corrective action; (3) Lookup facilities by waste processing categories of marketing, transporting, processing and energy recovery; (4) Use owner/operator information and names, titles and telephone numbers of project managers for prospecting; and (5) Browse detailed data on TSD facility and large quantity generators` activities such as onsite waste treatment, disposal, or recycling, offsite waste received, and waste generation and management. The product contains databases, search and retrieval software on two CD-ROMs, an installation diskette and User`s Guide. Environmental Factor has online context-sensitive help from any screen and a printed User`s Guide describing installation and step-by-step procedures for searching, retrieving and exporting. Hotline support is also available for no additional charge.« less
Environmental Factor{trademark} system: RCRA hazardous waste handler information
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1999-03-01
Environmental Factor{trademark} RCRA Hazardous Waste Handler Information on CD-ROM unleashes the invaluable information found in two key EPA data sources on hazardous waste handlers and offers cradle-to-grave waste tracking. It`s easy to search and display: (1) Permit status, design capacity and compliance history for facilities found in the EPA Resource Conservation and Recovery Information System (RCRIS) program tracking database; (2) Detailed information on hazardous wastes generation, management and minimization by companies who are large quantity generators, and (3) Data on the waste management practices of treatment, storage and disposal (TSD) facilities from the EPA Biennial Reporting System which is collectedmore » every other year. Environmental Factor`s powerful database retrieval system lets you: (1) Search for RCRA facilities by permit type, SIC code, waste codes, corrective action or violation information, TSD status, generator and transporter status and more; (2) View compliance information -- dates of evaluation, violation, enforcement and corrective action; (3) Lookup facilities by waste processing categories of marketing, transporting, processing and energy recovery; (4) Use owner/operator information and names, titles and telephone numbers of project managers for prospecting; and (5) Browse detailed data on TSD facility and large quantity generators` activities such as onsite waste treatment, disposal, or recycling, offsite waste received, and waste generation and management. The product contains databases, search and retrieval software on two CD-ROMs, an installation diskette and User`s Guide. Environmental Factor has online context-sensitive help from any screen and a printed User`s Guide describing installation and step-by-step procedures for searching, retrieving and exporting. Hotline support is also available for no additional charge.« less
NASA Astrophysics Data System (ADS)
Aidi, Muhammad Nur; Sari, Resty Indah
2012-05-01
A decision of credit that given by bank or another creditur must have a risk and it called credit risk. Credit risk is an investor's risk of loss arising from a borrower who does not make payments as promised. The substantial of credit risk can lead to losses for the banks and the debtor. To minimize this problem need a further study to identify a potential new customer before the decision given. Identification of debtor can using various approaches analysis, one of them is by using discriminant analysis. Discriminant analysis in this study are used to classify whether belonging to the debtor's good credit or bad credit. The result of this study are two discriminant functions that can identify new debtor. Before step built the discriminant function, selection of explanatory variables should be done. Purpose of selection independent variable is to choose the variable that can discriminate the group maximally. Selection variables in this study using different test, for categoric variable selection of variable using proportion chi-square test, and stepwise discriminant for numeric variable. The result of this study are two discriminant functions that can identify new debtor. The selected variables that can discriminating two groups of debtor maximally are status of existing checking account, credit history, credit amount, installment rate in percentage of disposable income, sex, age in year, other installment plans, and number of people being liable to provide maintenance. This classification produce a classification accuracy rate is good enough, that is equal to 74,70%. Debtor classification using discriminant analysis has risk level that is small enough, and it ranged beetwen 14,992% and 17,608%. Based on that credit risk rate, using discriminant analysis on the classification of credit status can be used effectively.
24 CFR 3285.405 - Severe wind zones.
Code of Federal Regulations, 2014 CFR
2014-04-01
... 24 Housing and Urban Development 5 2014-04-01 2014-04-01 false Severe wind zones. 3285.405 Section... DEVELOPMENT MODEL MANUFACTURED HOME INSTALLATION STANDARDS Anchorage Against Wind § 3285.405 Severe wind zones. When any part of a home is installed within 1,500 feet of a coastline in Wind Zones II or III, the...
24 CFR 3285.405 - Severe wind zones.
Code of Federal Regulations, 2013 CFR
2013-04-01
... 24 Housing and Urban Development 5 2013-04-01 2013-04-01 false Severe wind zones. 3285.405 Section... DEVELOPMENT MODEL MANUFACTURED HOME INSTALLATION STANDARDS Anchorage Against Wind § 3285.405 Severe wind zones. When any part of a home is installed within 1,500 feet of a coastline in Wind Zones II or III, the...
24 CFR 3285.405 - Severe wind zones.
Code of Federal Regulations, 2012 CFR
2012-04-01
... 24 Housing and Urban Development 5 2012-04-01 2012-04-01 false Severe wind zones. 3285.405 Section... DEVELOPMENT MODEL MANUFACTURED HOME INSTALLATION STANDARDS Anchorage Against Wind § 3285.405 Severe wind zones. When any part of a home is installed within 1,500 feet of a coastline in Wind Zones II or III, the...
Developing a Procedures Manual for Using the Innovacq 100 System Effectively and Efficiently.
ERIC Educational Resources Information Center
Cubberley, Carol
The installation of an automated acquisitions system, the Innovacq 100, demanded a review and revision of procedures in the Acquisitions Department of the University of Central Florida Library. This practicum report describes the process involved in developing the new procedures. Prior to installation, the old departmental procedures manual and…
ERIC Educational Resources Information Center
Bureau of Occupational and Adult Education (DHEW/OE), Washington, DC.
These individualized, self-paced student texts and workbooks for a secondary-postsecondary-level course in telephone equipment installation and repair is one of a number of military-developed curriculum packages selected for adaptation to vocational instruction and curriculum development in a civilian setting. Purpose stated for the course is to…
24 CFR 3285.405 - Severe wind zones.
Code of Federal Regulations, 2011 CFR
2011-04-01
... 24 Housing and Urban Development 5 2011-04-01 2011-04-01 false Severe wind zones. 3285.405 Section... DEVELOPMENT MODEL MANUFACTURED HOME INSTALLATION STANDARDS Anchorage Against Wind § 3285.405 Severe wind zones. When any part of a home is installed within 1,500 feet of a coastline in Wind Zones II or III, the...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Fu, Ran; Feldman, David; Margolis, Robert
NREL has been modeling U.S. photovoltaic (PV) system costs since 2009. This year, our report benchmarks costs of U.S. solar PV for residential, commercial, and utility-scale systems built in the first quarter of 2017 (Q1 2017). Costs are represented from the perspective of the developer/installer, thus all hardware costs represent the price at which components are purchased by the developer/installer, not accounting for preexisting supply agreements or other contracts. Importantly, the benchmark this year (2017) also represents the sales price paid to the installer; therefore, it includes profit in the cost of the hardware, along with the profit the installer/developermore » receives, as a separate cost category. However, it does not include any additional net profit, such as a developer fee or price gross-up, which are common in the marketplace. We adopt this approach owing to the wide variation in developer profits in all three sectors, where project pricing is highly dependent on region and project specifics such as local retail electricity rate structures, local rebate and incentive structures, competitive environment, and overall project or deal structures.« less
NASA Technical Reports Server (NTRS)
Cornelius, Michael; Smartt, Ziba; Henrie, Vaughn; Johnson, Mont
2003-01-01
The recent developments in Fabry-Perot fiber optic instruments have resulted in accurate transducers with some of the physical characteristics required for use in obtaining internal data from solid rocket motors. These characteristics include small size, non-electrical excitation, and immunity to electro-magnetic interference. These transducers have not been previously utilized in this environment due to the high temperatures typically encountered. A series of tests were conducted using a 1 1-Inch Hybrid test bed to develop installation techniques that will allow the fiber optic instruments to survive and obtain data for a short period of time following the motor ignition. The installation methods developed during this test series have the potential to allow data to be acquired in the motor chamber, propellant bore, and nozzle during the ignition transient. These measurements would prove to be very useful in the characterization of current motor designs and provide insight into the requirements for further refinements. The process of developing these protective methods and the installation techniques used to apply them is summarized.
U.S. Solar Photovoltaic System Cost Benchmark: Q1 2017
DOE Office of Scientific and Technical Information (OSTI.GOV)
Fu, Ran; Feldman, David J.; Margolis, Robert M.
NREL has been modeling U.S. photovoltaic (PV) system costs since 2009. This year, our report benchmarks costs of U.S. solar PV for residential, commercial, and utility-scale systems built in the first quarter of 2017 (Q1 2017). Costs are represented from the perspective of the developer/installer, thus all hardware costs represent the price at which components are purchased by the developer/installer, not accounting for preexisting supply agreements or other contracts. Importantly, the benchmark this year (2017) also represents the sales price paid to the installer; therefore, it includes profit in the cost of the hardware, along with the profit the installer/developermore » receives, as a separate cost category. However, it does not include any additional net profit, such as a developer fee or price gross-up, which are common in the marketplace. We adopt this approach owing to the wide variation in developer profits in all three sectors, where project pricing is highly dependent on region and project specifics such as local retail electricity rate structures, local rebate and incentive structures, competitive environment, and overall project or deal structures.« less
Status of the development of Brazilian Decimetric Array (BDA)
NASA Astrophysics Data System (ADS)
Sawant, Hanumant; Fernandes, Francisco; Chellasamy, Ebenezer; Cecatto, Jose R.; Costa, D. Joaquim; Sirothia, Sandeep Kumar; Subramanian, Koovapady
BDA will consists of 38 antennas of 4 meters diameter, capable of operating at frequency range of (1.2-1.7, 2.8 and 5.6) GHz. The array will be spread over the distances 2 x 1 km in a T shape with longest base line in E-W direction, having spatial resolution of ~10 sec of arc at 5.6 GHz. The visibility data can be processed to provide two dimensional images at a time resolution of 100 ms (or higher). In the second phase of the BDA, almost all systems of the 26 antennas are installed. LO of 10 MHz is send from receiver room to each receiver located in the each antenna tower. This receiver operates in the frequency range of 1-6 GHz and converts received signal to 70 MHz. Fiber optical system is partially installed in tower converts 70 MHz signal to optical signal and send to receiver room with low loss and phase compensation of 100 ps, where it is converted back to 70 MHz and processed to give output of 0-5 MHz bandpass and further processed by the correlator. Tracking system, with Dual feed back facility has tracking accuracy of +/- 3 arc minutes. All safety features are installed, with on line offset adjustment. Data logging and event logging for future investigations are available. Tracking system was tested for one month with 8 hours tracking and results of these will also be presented. Field programmable Gate Array based complex correlator system capable of producing all four Stokes parameters was designed and developed for correlating base band outputs from 38 antennas. The correlator produces delay and fringe corrected, visibility correlations between any two signal channels of the same polarizations from any given pair of antennas, providing visibility data. Fringes using this system have been obtained for baseline combinations of 12 fully installed antennas. Simulations of the UV coverage and imaging were carried out for the full synthesis observations of sources at different configurations and various declinations in -70 to +23 degrees range. The current system can image the Sun with spatial resolution of 3.40 x 4.54 arc min at 1.4 GHz. Results of the each of the above systems along with the observed fringes from the FPGA based complex correlator system from non redundant 12 antennas in two dimensions will be presented. BDA phase II will be operational shortly.
New superconducting cyclotron driven scanning proton therapy systems
NASA Astrophysics Data System (ADS)
Klein, Hans-Udo; Baumgarten, Christian; Geisler, Andreas; Heese, Jürgen; Hobl, Achim; Krischel, Detlef; Schillo, Michael; Schmidt, Stefan; Timmer, Jan
2005-12-01
Since one and a half decades ACCEL is investing in development and engineering of state of the art particle-therapy systems. A new medical superconducting 250 MeV proton cyclotron with special focus on the present and future beam requirements of fast scanning treatment systems has been designed. The first new ACCEL medical proton cyclotron is under commissioning at PSI for their PROSCAN proton therapy facility having undergone successful factory tests especially of the closed loop cryomagnetic system. The second cyclotron is part of ACCEL's integrated proton therapy system for Europe's first clinical center, RPTC in Munich. The cyclotron, the energy selection system, the beamline as well as the four gantries and patient positioners have been installed. The scanning system and major parts of the control software have already been tested. We will report on the concept of ACCEL's superconducting cyclotron driven scanning proton therapy systems and the current status of the commissioning work at PSI and RPTC.
Outsourced central archiving: an information bridge in a multi-IMAC environment
NASA Astrophysics Data System (ADS)
Gustavsson, Staffan; Tylen, Ulf; Carlsson, Goeran; Angelhed, Jan-Erik; Wintell, Mikael; Helmersson, Roger; Norrby, Clas
2001-08-01
In 1998 three hospitals merged to form the Sahlgrenska University Hospital. The total radiology production became 325 000 examinations per year. Two different PACS and RIS with different and incompatible archiving solutions were used since 1996. One PACS had commercial origin and the other was developed inhouse. Together they managed 1/3 of the total production. Due to differences in standard compliance and system architecture the communication was unsatisfactory. In order to improve efficiency, communication and the service level to our customers the situation was evaluated. It was decided to build a transparent virtual radiology department based on a modular approach. A common RIS and a central DICOM image archive as the central nodes in a star configured system were chosen. Web technique was chosen as the solution for distribution of images and reports. The reasons for the decisions as well as the present status of the installation are described and discussed is this paper.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Ruzic, David
The Thermoelectric-Driven Liquid-Metal Plasma-Facing Structures (TELS) project was able to establish the experimental conditions necessary for flowing liquid metal surfaces in order to be utilized as surfaces facing fusion relevant energetic plasma flux. The work has also addressed additional developments along with progressing along the timeline detailed in the proposal. A no-cost extension was requested to conduct other relevant experiment- specifically regarding the characterization droplet ejection during energetic plasma flux impact. A specially designed trench module, which could accommodate trenches with different aspect ratios was fabricated and installed in the TELS setup and plasma gun experiments were performed. Droplet ejectionmore » was characterized using high speed image acquisition and also surface mounted probes were used to characterize the plasma. The Gantt chart below had been provided with the original proposal, indicating the tasks to be performed in the third year of funding. These tasks are listed above in the progress report outline, and their progress status is detailed below.« less
Endogenous Opiates and Behavior: 2015.
Bodnar, Richard J
2017-02-01
This paper is the thirty-eighth consecutive installment of the annual review of research concerning the endogenous opioid system. It summarizes papers published during 2015 that studied the behavioral effects of molecular, pharmacological and genetic manipulation of opioid peptides, opioid receptors, opioid agonists and opioid antagonists. The particular topics that continue to be covered include the molecular-biochemical effects and neurochemical localization studies of endogenous opioids and their receptors related to behavior, and the roles of these opioid peptides and receptors in pain and analgesia, stress and social status, tolerance and dependence, learning and memory, eating and drinking, drug abuse and alcohol, sexual activity and hormones, pregnancy, development and endocrinology, mental illness and mood, seizures and neurologic disorders, electrical-related activity and neurophysiology, general activity and locomotion, gastrointestinal, renal and hepatic functions, cardiovascular responses, respiration and thermoregulation, and immunological responses. Copyright © 2016 Elsevier Inc. All rights reserved.
Endogenous opiates and behavior: 2001.
Bodnar, Richard J; Hadjimarkou, Maria M
2002-12-01
This paper is the twenty-fourth installment of the annual review of research concerning the opiate system. It summarizes papers published during 2001 that studied the behavioral effects of the opiate peptides and antagonists. The particular topics covered this year include the molecular-biochemical effects and neurochemical localization studies of endogenous opioids and their receptors (Section 2), and the roles of these opioid peptides and receptors in pain and analgesia (Section 3); stress and social status (Section 4); tolerance and dependence (Section 5); learning and memory (Section 6); eating and drinking (Section 7); alcohol and drugs of abuse (Section 8); sexual activity and hormones, pregnancy, development and endocrinology(Section 9); mental illness and mood (Section 10); seizures and neurologic disorders (Section 11); electrical-related activity and neurophysiology (Section 12); general activity and locomotion (Section 13); gastrointestinal, renal and hepatic functions (Section 14); cardiovascular responses (Section 15); respiration and thermoregulation (Section 16); and immunological responses (Section 17).
Endogenous opiates and behavior: 2013.
Bodnar, Richard J
2014-12-01
This paper is the thirty-sixth consecutive installment of the annual review of research concerning the endogenous opioid system. It summarizes papers published during 2013 that studied the behavioral effects of molecular, pharmacological and genetic manipulation of opioid peptides, opioid receptors, opioid agonists and opioid antagonists. The particular topics that continue to be covered include the molecular-biochemical effects and neurochemical localization studies of endogenous opioids and their receptors related to behavior, and the roles of these opioid peptides and receptors in pain and analgesia; stress and social status; tolerance and dependence; learning and memory; eating and drinking; alcohol and drugs of abuse; sexual activity and hormones, pregnancy, development and endocrinology; mental illness and mood; seizures and neurologic disorders; electrical-related activity and neurophysiology; general activity and locomotion; gastrointestinal, renal and hepatic functions; cardiovascular responses; respiration and thermoregulation; and immunological responses. Copyright © 2014 Elsevier Inc. All rights reserved.
Endogenous opiates and behavior: 2004.
Bodnar, Richard J; Klein, Gad E
2005-12-01
This paper is the 27th consecutive installment of the annual review of research concerning the endogenous opioid system, now spanning over 30 years of research. It summarizes papers published during 2004 that studied the behavioral effects of molecular, pharmacological and genetic manipulation of opioid peptides, opioid receptors, opioid agonists and opioid antagonists. The particular topics that continue to be covered include the molecular-biochemical effects and neurochemical localization studies of endogenous opioids and their receptors related to behavior, and the roles of these opioid peptides and receptors in pain and analgesia; stress and social status; tolerance and dependence; learning and memory; eating and drinking; alcohol and drugs of abuse; sexual activity and hormones, pregnancy, development and endocrinology; mental illness and mood; seizures and neurologic disorders; electrical-related activity and neurophysiology; general activity and locomotion; gastrointestinal, renal and hepatic functions; cardiovascular responses; respiration and thermoregulation; and immunological responses.
Upgrading the ATLAS Tile Calorimeter Electronics
NASA Astrophysics Data System (ADS)
Carrió, Fernando
2013-11-01
This work summarizes the status of the on-detector and off-detector electronics developments for the Phase 2 Upgrade of the ATLAS Tile Calorimeter at the LHC scheduled around 2022. A demonstrator prototype for a slice of the calorimeter including most of the new electronics is planned to be installed in ATLAS in the middle of 2014 during the first Long Shutdown. For the on-detector readout, three different front-end boards (FEB) alternatives are being studied: a new version of the 3-in-1 card, the QIE chip and a dedicated ASIC called FATALIC. The Main Board will provide communication and control to the FEBs and the Daughter Board will transmit the digitized data to the off-detector electronics in the counting room, where the super Read-Out Driver (sROD) will perform processing tasks on them and will be the interface to the trigger levels 0, 1 and 2.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Wissemann, Chris; White, Stanley M
The primary objective of the project was to develop a innovative Gravity Base Foundation (GBF) concepts, including fabrication yards, launching systems and installation equipment, for a 500MW utility scale project in the Great Lakes (Lake Erie). The goal was to lower the LCOE by 25%. The project was the first to investigate an offshore wind project in the Great Lakes and it has furthered the body of knowledge for foundations and installation methods within Lake Erie. The project collected historical geotechnical information for Lake Erie and also used recently obtained data from the LEEDCo Icebreaker Project (FOA DE-EE0005989) geotechnical programmore » to develop the conceptual designs. Using these data-sets, the project developed design wind and wave conditions from actual buoy data in order to develop a concept that would de-risk a project using a GBF. These wind and wave conditions were then utilized to create reference designs for various foundations specific to installation in Lake Erie. A project partner on the project (Weeks Marine) provided input for construction and costing the GBF fabrication and installation. By having a marine contractor with experience with large marine projects as part of the team provides credibility to the LCOE developed by NREL. NREL then utilized the design and construction costing information as part of the LCOE model. The report summarizes the findings of the project; Developed a cost model and “baseline” LCOE; Documented Site Conditions within Lake Erie; Developed Fabrication, Installation and Foundations Innovative Concept Designs; Evaluated LCOE Impact of Innovations; Developed Assembly line “Rail System” for GBF Construction and Staging; Developed Transit-Inspired Foundation Designs which incorporated: Semi-Floating Transit with Supplemental Pontoons Barge mounted Winch System; Developed GBF with “Penetration Skirt”; Developed Integrated GBF with Turbine Tower; Developed Turbine, Plant Layout and O&M Strategies. The report details lowering LCOE by 22.3% and identified additional strategies that could further lower LCOE when building an utility scale wind farm in the Great Lakes.« less
Integrated residential photovoltaic array development
NASA Technical Reports Server (NTRS)
Shepard, N. F., Jr.
1981-01-01
Three basic module design concepts were analyzed with respect to both production and installation costs. The results of this evaluation were used to synthesize a fourth design which incorporates the best features of these initial concepts to produce a module/array design approach which offers the promise of a substantial reduction in the installed cost of a residential array. A unique waterproofing and mounting scheme was used to reduce the cost of installing an integral array while still maintaining a high probability that the installed array will be watertight for the design lifetime of the system. This recommended concept will also permit the array to be mounted as a direct or stand-off installation with no changes to the module design.
Trapping fresh sea breeze in desert? Health status of Camanchaca, Atacama's fog.
Bonnail, Estefanía; Cunha Lima, Ricardo; Martínez Turrieta, Gladys
2018-05-24
Water fog composition was investigated at a fog harvesting installation in the coast of Atacama (North Chile). Chañaral is historically affected by mining contamination discharges. Hydro-chemical characterization of fog water from top of the mountain (where capture installation is located) and at the bottom of the mountain (after vertical transportation where an aquaponic system is located) revealed many compositional differences that compromise the use of water. High acidity and high concentrations in Cu and As in water collected on top of the mountain were found; meanwhile, acidity and Cu decreased, and As levels overpassed the drinking water standards after the vertical transportation. Collected data was assessed according to national and international regulatory standards, neutralization factors (NF), sodium adsorption ratio (SAR), and ion ratios to determine origin of contamination and suitability of destined for human consumption, irrigation, or aquaculture purposes.
NASA Astrophysics Data System (ADS)
Ji, H.; Bhattacharjee, A.; Prager, S.; Daughton, W.; Chen, Y.; Cutler, R.; Fox, W.; Hoffmann, F.; Kalish, M.; Jara-Almonte, J.; Myers, C.; Ren, Y.; Yamada, M.; Yoo, J.; Bale, S. D.; Carter, T.; Dorfman, S.; Drake, J.; Egedal, J.; Sarff, J.; Wallace, J.
2016-10-01
The FLARE device (flare.pppl.gov) is a new intermediate-scale plasma experiment under construction at Princeton for the studies of magnetic reconnection in the multiple X-line regimes directly relevant to space, solar, astrophysical, and fusion plasmas, as guided by a reconnection phase diagram [Ji & Daughton, (2011)]. Most of major components either have been already fabricated or are near their completion, including the two most crucial magnets called flux cores. The hardware assembly and installation begin in this summer, followed by commissioning in 2017. Initial comprehensive set of research diagnostics will be constructed and installed also in 2017. The main diagnostics is an extensive set of magnetic probe arrays, covering multiple scales from local electron scales, to intermediate ion scales, and global MHD scales. The planned procedures and example topics as a user facility will be discussed.
NASA Astrophysics Data System (ADS)
Li, Nana; Xie, Guohui
2018-06-01
Abstract—Global renewable energy have maintained a steady growth in recent years under the support of national policies and energy demand. Resource distribution, land supply, economy, voltage class and other relevant conditions affect the renewable energy distribution and development mode. Therefore, is necessary to analyze the spatial-temporal distribution and development modes for renewable energy, so as to provide reference and guidance for the renewable energy development around world. Firstly, the definitions and influence factors the renewable energy development mode are compared and summarized. Secondly, the renewable energy spatial-temporal distribution in Germany and Denmark are provided. Wind and solar power installations account for the largest proportion of all renewable energy in Germany and Denmark. Finally, renewable energy development modes are studied. The distributed photovoltaic generation accounts for more than 95%, and distributed wind power generation installations account for over 85% in Germany. Solar and wind resources are developed with distributed development mode, in which distributed wind power installation accounts for over 75%.
The Present Status of Using Natural Gas Cylinders and Acoustic Emission in Thailand
NASA Astrophysics Data System (ADS)
Jomdecha, C.; Jirarungsatian, C.; Methong, W.; Poopat, B.
This chapter presents the status of using natural gas cylinders (CNG/NGV) and acoustic emission (AE) in Thailand. During the period from 2006 to 2013, more than 600,000 CNG cylinder units for vehicles were installed and used for transportation, cars, and trucks in Thailand. The number of cylinder units will be tentatively increased in the future due to the increase in gasoline price. Due to the use of high-pressurization equipment in public, the issue of a risk to public safety has been raised. As of this writing, in 2013, the testing standard from the Thai Department of Energy Business recommends inspection every 5 years using effective inspection methods in order to guarantee safe usage of gas cylinders, including the AE method, following ISO 16148. Normally in Thailand, AE is used in research and petrochemical plants as a special technique. The main applications are testing of pressure vessels, aboveground storage tanks, and university research. Few companies are available to conduct AE for testing natural gas cylinders due to the limited safety of the high-pressure operation and AE equipment and a lack of qualified AE personnel. To develop AE techniques, equipment, procedures, and acceptance criteria of natural gas cylinders are the main focus of AE personnel in Thailand. A desired achievement for current development is for natural gas cylinder testing, which can be applied in field tests and supported by a national testing standard.
Environmental Assessment of Installation Development at Joint Base San Antonio-Lackland, Texas
2013-02-01
habitat for terrestrial and avian species by creating a more natural habitat. Long-term, negligible to minor, adverse effects on fish species associated...cumulative effects on the natural and man-made environment of the other currently identified projects from the installation development and resource...adverse effect . And, for Project C6, the developed measures are to prior to construction provide elevation drawings or renderings of the building
DOE Office of Scientific and Technical Information (OSTI.GOV)
Baldock, Nick; Sevilla, Fernando; Redfern, Robin
The United States Department of Energy (DOE) awarded a grant to GL Garrad Hassan (GL GH) to investigate the logistics, opportunities, and costs associated with existing and emerging installation and operation and maintenance (O&M) activities at offshore wind projects as part of the DOE’s program to reduce barriers facing offshore wind project development in the United States (U.S.). This report (the Report) forms part of Subtopic 5.3 “Optimized Installation, Operation and Maintenance Strategies Study” which in turn is part of the “Removing Market Barriers in U.S. Offshore Wind” set of projects for the DOE. The purpose of Subtopic 5.3 ismore » to aid and facilitate informed decision-making regarding installation and O&M during the development, installation, and operation of offshore wind projects in order to increase efficiency and reduce the levelized cost of energy (LCoE). Given the large area of U.S. territorial waters, the generally higher mean wind speeds offshore, and the proximity to the coast of many large U.S. cities, offshore wind power has the potential to become a significant contributor of energy to U.S. markets. However, for the U.S. to ensure that the development of offshore wind energy projects is carried out in an efficient and cost-effective manner, it is important to be cognizant of the current and emerging practices in both the domestic and international offshore wind energy industries. The U.S. can harness the experience gained globally and combine this with the skills and assets of an already sizeable onshore wind industry, as well as the resources of a mature offshore oil and gas industry, to develop a strong offshore wind sector. The work detailed in this report is aimed at assisting with that learning curve, particularly in terms of offshore specific installation and O&M activities. This Report and the Installation and O&M LCoE Analysis Tool, which were developed together by GL GH as part of this study, allow readers to identify, model and probe the economic merits and sensitivities of various approaches to construction and O&M practices, using illustrative offshore projects across a wide range of alternative offshore development areas located in U.S. waters. The intention is to assist decision-makers in clearly understanding the relative economic benefits of both conventional and novel construction installation methodologies and maintenance techniques within the critical parameters of a Project’s LCoE.« less
Integrated Baseline System (IBS). Version 1.03, System Management Guide
DOE Office of Scientific and Technical Information (OSTI.GOV)
Williams, J.R.; Bailey, S.; Bower, J.C.
This IBS System Management Guide explains how to install or upgrade the Integrated Baseline System (IBS) software package. The IBS is an emergency management planning and analysis tool that was developed under the direction of the Federal Emergency Management Agency (FEMA). This guide includes detailed instructions for installing the IBS software package on a Digital Equipment Corporation (DEC) VAX computer from the IBS distribution tapes. The installation instructions include procedures for both first-time installations and upgrades to existing IBS installations. To ensure that the system manager has the background necessary for successful installation of the IBS package, this guide alsomore » includes information on IBS computer requirements, software organization, and the generation of IBS distribution tapes. When special utility programs are used during IBS installation and setups, this guide refers you to the IBS Utilities Guide for specific instructions. This guide also refers you to the IBS Data Management Guide for detailed descriptions of some IBS data files and structures. Any special requirements for installation are not documented here but should be included in a set of installation notes that come with the distribution tapes.« less
Code of Federal Regulations, 2014 CFR
2014-01-01
..., Specifications, Contract Documents and Other Documentation Part D—Inspection of Development Work Part A..., installation, device, arrangement, or method of work is at least equivalent to that prescribed in this exhibit..., within allowable stress and settlement limitations, all applicable loads. Any foundation and anchorage...
Code of Federal Regulations, 2011 CFR
2011-01-01
..., Specifications, Contract Documents and Other Documentation Part D—Inspection of Development Work Part A..., installation, device, arrangement, or method of work is at least equivalent to that prescribed in this exhibit..., within allowable stress and settlement limitations, all applicable loads. Any foundation and anchorage...
Code of Federal Regulations, 2012 CFR
2012-01-01
..., Specifications, Contract Documents and Other Documentation Part D—Inspection of Development Work Part A..., installation, device, arrangement, or method of work is at least equivalent to that prescribed in this exhibit..., within allowable stress and settlement limitations, all applicable loads. Any foundation and anchorage...
EarthScope's Transportable Array: Advancing Eastward
NASA Astrophysics Data System (ADS)
Busby, R. W.; Vernon, F.; Newman, R. L.; Astiz, L.
2006-12-01
EarthScope's Transportable Array has installed more than 200 high-quality broadband seismic stations over the last 3 years in the western US. These stations have a nominal spacing of 70 km and are part of an eventual 400 station array that migrates from west to east at a rate of 18 stations per month. The full 400 stations will be operating by September 2007. Stations have a residence time of about 2 years before being relocated to the next site. Throughout the continental US, 1623 sites are expected to be occupied. Standardized procedures and protocols have been developed to streamline all aspects of Transportable Array operations, from siting to site construction and installation to equipment purchasing and data archiving. Earned Value Management tools keep facility installation and operation on budget and schedule. A diverse, yet efficient, infrastructure installs and maintains the Transportable Array. Sensors, dataloggers, and other equipment are received and tested by the IRIS PASSCAL Instrument Center and shipped to regional storage facilities. To engage future geoscientists in the project, students are trained to conduct field and analytical reconnaissance to identify suitable seismic station sites. Contract personnel are used for site verification; vault construction; and installation of sensors, power, and communications systems. IRIS staff manages permitting, landowner communications, and station operations and maintenance. Seismic signal quality and metadata are quality-checked at the Array Network Facility at the University of California-San Diego and simultaneously archived at the IRIS Data Management Center in Seattle. Station equipment has been specifically designed for low power, remote, unattended operation and uses diverse two-way IP communications for real-time transmission. Digital cellular services, VSAT satellite, and commercial DSL, cable or wireless transport services are employed. Automatic monitoring of status, signal quality and earthquake event detection as well as operational alarms for low voltage and water intrusion are performed by a robust data acquisition package. This software is coupled with a host of network management tools and display managers operated by the Array Network Facility to allow managers, field personnel, and network operations staff to visualize array performance in real-time and to access historical information for diagnostics. Current data recording proficiency is 99.1%, with real-time telemetry averaging about 91%. EarthScope, IRIS and the USGS are working with regional seismic network operators, both existing and newly formed, to transition some of the Transportable Array stations into regional network assets. Each region has unique circumstances and interested parties are invited to exchange ideas on how this might be accomplished in their area. Contact busby@iris.edu for more information.
Army Hearing Program Status Report Quarter 2 Fiscal Year 2017
2017-07-01
some level of tinnitus . RHC-A had 186 Soldiers who reported some level of tinnitus . RHC-C and RHC-P had 460 Soldiers and 34 Soldiers, respectively...who reported some level of tinnitus . Tinnitus numbers should be viewed at the individual installation level and kept in context of the number of...regions. Clinical Hearing Services: It is important to understand that the reported tinnitus numbers are a subset of those Soldiers who received a
Reestablishing Open Rotor as an Option for Significant Fuel Burn Improvements
NASA Technical Reports Server (NTRS)
Van Zante, Dale
2011-01-01
A low-noise open rotor system is being tested in collaboration with General Electric and CFM International, a 50/50 joint company between Snecma and GE. Candidate technologies for lower noise will be investigated as well as installation effects such as pylon integration. Current test status is presented as well as future scheduled testing which includes the FAA/CLEEN test entry. Pre-test predictions show that Open Rotors have the potential for revolutionary fuel burn savings.
2011-08-01
Estimated Air Pollutant Emissions for Boilers at CSPs at Tinker AFB ..................... 3-8 6 Table 3-2. Special Status Plant and Animal Species of...environment associated with the decentralization and optimization offour central steam plants (CSPs) located at Tinker Air Force Base (AFB), Oklahoma...square feet and represent approximately 48 percent of the installation’s total building area. Three of the plants (CSP 208, CSP 3001 and CSP 5802
Method of installing a control room console in a nuclear power plant
Scarola, Kenneth; Jamison, David S.; Manazir, Richard M.; Rescorl, Robert L.; Harmon, Daryl L.
1994-01-01
An advanced control room complex for a nuclear power plant, including a discrete indicator and alarm system (72) which is nuclear qualified for rapid response to changes in plant parameters and a component control system (64) which together provide a discrete monitoring and control capability at a panel (14-22, 26, 28) in the control room (10). A separate data processing system (70), which need not be nuclear qualified, provides integrated and overview information to the control room and to each panel, through CRTs (84) and a large, overhead integrated process status overview board (24). The discrete indicator and alarm system (72) and the data processing system (70) receive inputs from common plant sensors and validate the sensor outputs to arrive at a representative value of the parameter for use by the operator during both normal and accident conditions, thereby avoiding the need for him to assimilate data from each sensor individually. The integrated process status board (24) is at the apex of an information hierarchy that extends through four levels and provides access at each panel to the full display hierarchy. The control room panels are preferably of a modular construction, permitting the definition of inputs and outputs, the man machine interface, and the plant specific algorithms, to proceed in parallel with the fabrication of the panels, the installation of the equipment and the generic testing thereof.
Status of ARGOS - The Laser Guide Star System for the LBT
NASA Astrophysics Data System (ADS)
Raab, Walfried; Rabien, Sebastian; Gaessler, Wolfgang; Esposito, Simone; Antichi, Jacopo; Lloyd-Hart, Michael; Barl, Lothar; Beckmann, Udo; Bonaglia, Marco; Borelli, Jose; Brynnel, Joar; Buschkamp, Peter; Busoni, Lorenzo; Carbonaro, Luca; Christou, Julian; Connot, Claus; Davies, Richard; Deysenroth, Matthias; Durney, Olivier; Green, Richard; Gemperlein, Hans; Gasho, Victor; Haug, Marcus; Hubbard, Pete; Ihle, Sebastian; Kulas, Martin; Loose, Christina; Lehmitz, Michael; Noenickx, Jamison; Nussbaum, Edmund; Orban De Xivry, Gilles; Quirrenbach, Andreas; Peter, Diethard; Rahmer, Gustavo; Rademacher, Matt; Storm, Jesper; Schwab, Christian; Vaitheeswaran, Vidhya; Ziegleder, Julian
2013-12-01
ARGOS is an innovative multiple laser guide star adaptive optics system for the Large Binocular Telescope (LBT), designed to perform effective GLAO correction over a very wide field of view. The system is using high powered pulsed green (532 nm) lasers to generate a set of three guide stars above each of the LBT mirrors. The laser beams are launched through a 40 cm telescope and focused at an altitude of 12 km, creating laser beacons by means of Rayleigh scattering. The returning scattered light, primarily sensitive to the turbulences close to the ground, is detected by a gated wavefront sensor system. The derived ground layer correction signals are directly driving the adaptive secondary mirror of the LBT. ARGOS is especially designed for operation with the multiple object spectrograph Luci, which will benefit from both, the improved spatial resolution, as well as the strongly enhanced flux. In addition to the GLAO Rayleigh beacon system, ARGOS was also designed for a possible future upgrade with a hybrid sodium laser - Rayleigh beacon combination, enabling diffraction limited operation. The ARGOS laser system has undergone extensive tests during Summer 2012 and is scheduled for installation at the LBT in Spring 2013. The remaining sub-systems will be installed during the course of 2013. We report on the overall status of the ARGOS system and the results of the sub-system characterizations carried out so far.
Radioactive ion beam acceleration at MAFF
NASA Astrophysics Data System (ADS)
Pasini, M.; Kester, O.; Habs, D.; Groß, M.; Sieber, T.; Maier, H. J.; Assmann, W.; Krüken, R.; Faestermann, T.; Schempp, A.; Ratzinger, U.; Safvan, C. P.
2004-12-01
In April 2003, the German safety commission has given the final approval for the oper- ation of the high flux reactor FRM-II. This is an important step towards the development and installation of the Munich accelerator for fission fragments (MAFF), which will deliver highest intensities of neutron rich fission fragments. The acceleration chain of MAFF [1] consists of a charge breeder, which will deliver the ions with a mass to charge ratio of A/q ⩽ 6.3 irrespective of the mass range, and with a repetition rate of maximum 50 Hz. The LINAC operating at 10% duty cycle is composed of a 101.28 IH-RFQ, which will boost up the energy from 2.5 up to 300 keV/u, three IH-tanks that will deliver an energy of 5.4 MeV/u and 2 seven gap IH-resonators that are used to vary the final energy up to a maximum of 5.9 MeV/u. Currently beam dynamics revisions are in progress especially in the low energy section, since the experimental program has requested specific time structures of the beam for TOF experiments. The status of the beam dynamics studies as well as the status of the single components of the accelerator will be presented in this paper.
Prognostics and Health Management of Wind Turbines: Current Status and Future Opportunities
DOE Office of Scientific and Technical Information (OSTI.GOV)
Sheng, Shuangwen
Prognostics and health management is not a new concept. It has been used in relatively mature industries, such as aviation and electronics, to help improve operation and maintenance (O&M) practices. In the wind industry, prognostics and health management is relatively new. The level for both wind industry applications and research and development (R&D) has increased in recent years because of its potential for reducing O&M cost of wind power, especially for turbines installed offshore. The majority of wind industry application efforts has been focused on diagnosis based on various sensing and feature extraction techniques. For R&D, activities are being conductedmore » in almost all areas of a typical prognostics and health management framework (i.e., sensing, data collection, feature extraction, diagnosis, prognosis, and maintenance scheduling). This presentation provides an overview of the current status of wind turbine prognostics and health management that focuses on drivetrain condition monitoring through vibration, oil debris, and oil condition analysis techniques. It also discusses turbine component health diagnosis through data mining and modeling based on supervisory control and data acquisition system data. Finally, it provides a brief survey of R&D activities for wind turbine prognostics and health management, along with future opportunities.« less
Nanotomography endstation at the P05 beamline: Status and perspectives
NASA Astrophysics Data System (ADS)
Greving, I.; Ogurreck, M.; Marschall, F.; Last, A.; Wilde, F.; Dose, T.; Burmester, H.; Lottermoser, L.; Müller, M.; David, C.; Beckmann, F.
2017-06-01
The Imaging Beamline IBL/P05 at the DESY storage ring PETRA III, operated by the Helmholtz-Zentrum Geesthacht, has two dedicated endstations optimized for micro- and nanotomography experiments [1-3]. Here we present the status of the nanotomography endstation, highlight the latest instrumentation upgrades and present first experimental results. In particular in materials science, where structures with ceramics or metallic materials are of interest, X-ray energies of 15 keV and above are required even for sample sizes of several 10 μm in diameter. The P05 imaging beamline is dedicated to materials science and is designed to allow for imaging applications with X-ray energies of 10 to 50 keV. In addition to the full field X-ray microscopy setup, the layout of the nanotomography endstation allows switching to cone-beam configuration. Kinematics for X-ray optics like compound refractive lenses (CRLs), Fresnel zone plates (FZP) or beam-shaping optics are implemented and the installation of a Kirkpatrick Baez-mirror (KB mirror) system is foreseen at a later stage of the beamline development. Altogether this leads to a high flexibility of the nanotomography setup such that the instrument can be tailored to the specific experimental requirements of a range of sample systems.
Status and performance of HST/Wide Field Camera 3
NASA Astrophysics Data System (ADS)
Kimble, Randy A.; MacKenty, John W.; O'Connell, Robert W.
2006-06-01
Wide Field Camera 3 (WFC3) is a powerful UV/visible/near-infrared camera currently in development for installation into the Hubble Space Telescope. WFC3 provides two imaging channels. The UVIS channel features a 4096 x 4096 pixel CCD focal plane covering 200 to 1000 nm wavelengths with a 160 x 160 arcsec field of view. The UVIS channel provides unprecedented sensitivity and field of view in the near ultraviolet for HST. It is particularly well suited for studies of the star formation history of local galaxies and clusters, searches for Lyman alpha dropouts at moderate redshift, and searches for low surface brightness structures against the dark UV sky background. The IR channel features a 1024 x 1024 pixel HgCdTe focal plane covering 800 to 1700 nm with a 139 x 123 arcsec field of view, providing a major advance in IR survey efficiency for HST. IR channel science goals include studies of dark energy, galaxy formation at high redshift, and star formation. The instrument is being prepared for launch as part of HST Servicing Mission 4, tentatively scheduled for late 2007, contingent upon formal approval of shuttle-based servicing after successful shuttle return-to-flight. We report here on the status and performance of WFC3.
Installation and operation of a large scale RAPS system in Peru
NASA Astrophysics Data System (ADS)
Cole, J. F.
In 1997, International Lead Zinc Research Organization Inc. (ILZRO), Solar Energy Industries Association (SEIA), and the Ministry of Energy and Mines (MEM) of Peru signed a Memorandum of Understanding to facilitate the installation of hybrid remote area power supply (RAPS) systems in the Amazon region of Peru. Many remote villages in this vast region have either no or limited electricity supplied by diesel generators running a few hours per day. Subsequently, ILZRO sponsored the engineering design of the hybrid RAPS system and SEIA supported a socio-economic study to determine the sustainability of such systems and the locations for pilot installations. In mid-1998, the Peruvian government approved the design of the system. ILZRO then began efforts to obtain governmental and inter-governmental funding to supplement its own funds to underwrite the cost of manufacture and installation of the systems in two villages in the Amazon region. Additional major funding has been received from the Global Environmental Facility (GEF) administered by the United Nations Development Program (UNDP) and from the Common Fund for Commodities (CFC). Funds have also been received from the US Department of Energy, the International Greenhouse Partnership (Australia) and the Peruvian government. The RAPS system consists of modules designed to provide 150 kW h per day of utility grade ac electricity over a 24 h period. Each module contains a diesel generator, battery bank using heavy-duty 2 V VRLA GEL batteries, a battery charger, a photovoltaic array and an ac/dc inverter. The batteries and electrical components are housed in modified shipping containers. The modules can be installed with a new generator or retrofitted to an existing generator. The charging and discharging regime of the batteries has been recommended by a study carried out by CSIRO, which has simulated the RAPS operation. The system will employ a partial-state-of-charge (PSOC) regime in order to optimize the life of the batteries, which have a projected life of 8-10 years. A remote monitoring system will consist of a satellite link between each of the remote area power systems and one or more central hosts. The system operator will be able to obtain actual operational status of the system and will be able to change set points and to force operation of certain functions in order to test the system. Preliminary cost analyses indicate that such RAPS systems are more economically attractive to provide electricity to remote villages than other alternatives, including 24 h diesel generation and grid extension. The past 5 years have provided a number of lessons learned, particularly related to dealing with government agencies in a developing country, overcoming logistical problems such as shipping long distances and dealing with difficult climate and terrain. Despite difficulties encountered, the promise of RAPS systems as a rapidly growing market for lead-acid batteries appears to be bright given the demand for sustainable remote electrification.
The 11 T dipole for HL-LHC: Status and plan
Savary, F.; Barzi, E.; Bordini, B.; ...
2016-06-01
The upgrade of the Large Hadron Collider (LHC) collimation system includes additional collimators in the LHC lattice. The longitudinal space for these collimators will be created by replacing some of the LHC main dipoles with shorter but stronger dipoles compatible with the LHC lattice and main systems. The project plan comprises the construction of two cryoassemblies containing each of the two 11-T dipoles of 5.5-m length for possible installation on either side of interaction point 2 of LHC in the years 2018-2019 for ion operation, and the installation of two cryoassemblies on either side of interaction point 7 of LHCmore » in the years 2023-2024 for proton operation. The development program conducted in conjunction between the Fermilab and CERN magnet groups is progressing well. The development activities carried out on the side of Fermilab were concluded in the middle of 2015 with the fabrication and test of a 1-m-long two-in-one model and those on the CERN side are ramping up with the construction of 2-m-long models and the preparation of the tooling for the fabrication of the first full-length prototype. The engineering design of the cryomagnet is well advanced, including the definition of the various interfaces, e.g., with the collimator, powering, protection, and vacuum systems. Several practice coils of 5.5-m length have been already fabricated. This paper describes the overall progress of the project, the final design of the cryomagnet, and the performance of the most recent models. Furthermore, the overall plan toward the fabrication of the series magnets for the two phases of the upgrade of the LHC collimation system is also presented.« less
EPA RE-Powering Mapper Completed Installations
The U.S. Environmental Protection Agency (EPA) Office of Land and Emergency Management (OLEM) Office of Communications, Partnerships and Analysis (OCPA) initiated the RE-Powering America's Land Initiative to demonstrate the enormous potential that contaminated lands, landfills, and mine sites provide for developing renewable energy in the United States. Using publically available information, RE-Powering maintains a list of completed renewable energy installations on contaminated sites and landfills. To date, the RE-Powering Initiative has identified 179 renewable energy installations on 171 contaminated lands, landfills, and mine sites, with a cumulative installed capacity of just over 1,124 megawatts (MW) and consistent growth in total installations since the inception of the RE-Powering Initiative. This dataset is current as of April 2016.
Monitoring the battery status for photovoltaic systems
NASA Astrophysics Data System (ADS)
Kim, Myungsoo; Hwang, Euijin
Photovoltaic power systems in Korea have been installed in remote islands where it is difficult to connect the utilities. Lead/acid batteries are used as an energy storage device for the stand-alone photovoltaic system. Hence, monitoring the battery status of photovoltaic systems is quite important to extend the total system service life. To monitor the state-of-charge of batteries, we adopted a current interrupt technique to measure the internal resistance of the battery. The internal resistance increases at the end of charge/discharge steps and also with cycles. The specific gravity of the electrolyte was measured in relation to the state-of-charge. A home-made optical hydrometer was utilized for automatic monitoring of the specific gravity. It is shown that the specific gravity and stratification increase with cycle number. One of the photovoltaic systems in a remote island, Ho-do, which has 90 kW peak power was checked for actual operational conditions such as solar generation, load, and battery status.
Parkes, Katharine R
2003-05-01
Significant overweight among offshore workers on North Sea oil and gas installations has been linked to high calorie intake, lack of active leisure-time pursuits, and environmental factors conducive to weight gain. However, the prevalence of overweight among offshore workers has not been examined in recent data, and no longitudinal studies of body mass index (BMI) in this occupational group have been reported. Aims The present study sought to examine BMI levels in a sample of UK offshore personnel, and to evaluate demographic factors, smoking and work-related physical activity as predictors of BMI, and 5 year change in BMI. Survey data (including age, education, marital status, work-related physical activity and height/weight) were collected in 1995 from male workers on 17 North Sea installations (n = 1581, 83% response rate); follow-up data were obtained in 2000 (n = 354, 34.9% of the potential sample). Overall mean BMI was 25.6 (2.8) kg/m(2): rates of obesity (BMI > 30) and overweight (BMI = 25-30) were 7.5 and 47.3%, respectively. Mean age was 38.7 (8.9) years; linear and quadratic age terms predicted BMI. Age-adjusted BMI values were very similar to those reported from other offshore studies over the past 15 years. Age, marital status, education, smoking and physical activity significantly predicted baseline BMI, but only age (and some interactive effects) predicted 5 year BMI change. The present age-adjusted BMI values were closely similar to those found offshore in the mid-1980s, but also to recent national data; thus, North Sea personnel do not appear to reflect current population trends towards increased BMI levels. This result accords with the emphasis now given to health promotion (particularly dietary change) on offshore installations; the present findings also highlight the need to focus these initiatives on workers with sedentary jobs and/or low education.
Solar Cogeneration of Electricity and Hot Water at DoD Installations
2014-06-01
EW-201248) Solar Cogeneration of Electricity and Hot Water at DoD Installations June 2014 This report was prepared under contract to the...2014 ESTCP COST AND PERFORMANCE REPORT Solar Cogeneration of Electricity and Hot Water at DoD Installations W912HQ-12-C-0053 EW-201248Ratson...demonstrate an innovative hybrid electric/thermal solar cogeneration system, document performance and cost advantages, and develop financing models and
Moore, Natalie; Haines, Victoria; Lilley, Debra
2015-11-01
Social housing organisations are increasingly installing renewable energy technologies, particularly for the provision of heating and hot water. To meet carbon reduction targets, uptake and installation must allow occupants to use the technology effectively. This paper describes research which investigated the service of installing heat pumps into UK social housing properties, from both landlords' and tenants' experiences. Adopting a user centred design approach, the research was in three phases: an exploration study to investigate landlords' and tenants' experiences of heat pump installation and use; refinement and development of the requirements for improved service delivery, primarily technology introduction and control; and the development and initial evaluation of an information leaflet as a key touchpoint in the service delivery. Recommendations for improved service delivery, to enable heat pumps to be accepted and used more effectively, are presented, as well as reflection on the process of applying user centred design in this context. In a relatively immature area of industry, installations to date have been heavily focused on technical aspects. This paper provides an insight into the human aspects of the service delivery of heat pumps in social housing, providing designers and social housing landlords with insight about how to improve the service.
Moore, Natalie; Lilley, Debra
2015-01-01
Social housing organisations are increasingly installing renewable energy technologies, particularly for the provision of heating and hot water. To meet carbon reduction targets, uptake and installation must allow occupants to use the technology effectively. This paper describes research which investigated the service of installing heat pumps into UK social housing properties, from both landlords’ and tenants’ experiences. Adopting a user centred design approach, the research was in three phases: an exploration study to investigate landlords’ and tenants’ experiences of heat pump installation and use; refinement and development of the requirements for improved service delivery, primarily technology introduction and control; and the development and initial evaluation of an information leaflet as a key touchpoint in the service delivery. Recommendations for improved service delivery, to enable heat pumps to be accepted and used more effectively, are presented, as well as reflection on the process of applying user centred design in this context. In a relatively immature area of industry, installations to date have been heavily focused on technical aspects. This paper provides an insight into the human aspects of the service delivery of heat pumps in social housing, providing designers and social housing landlords with insight about how to improve the service. PMID:26539060
Chapter 7: Renewable Energy Options and Considerations for Net Zero Installations
DOE Office of Scientific and Technical Information (OSTI.GOV)
Booth, Samuel
This chapter focuses on renewable energy options for military installations. It discusses typical renewable technologies, project development, and gives examples. Renewable energy can be combined with conventional energy sources to provide part or all of the energy demand at an installation. The appropriate technology mix for an installation will depend on site-specific factors such as renewable resources, energy costs, local energy policies and incentives, available land, mission compatibility, and other factors. The objective of this chapter is to provide basic background information and resources on renewable energy options for NATO leaders and energy personnel.
Aerodynamics of heat exchangers for high-altitude aircraft
NASA Technical Reports Server (NTRS)
Drela, Mark
1996-01-01
Reduction of convective beat transfer with altitude dictates unusually large beat exchangers for piston- engined high-altitude aircraft The relatively large aircraft drag fraction associated with cooling at high altitudes makes the efficient design of the entire heat exchanger installation an essential part of the aircraft's aerodynamic design. The parameters that directly influence cooling drag are developed in the context of high-altitude flight Candidate wing airfoils that incorporate heat exchangers are examined. Such integrated wing-airfoil/heat-exchanger installations appear to be attractive alternatives to isolated heat.exchanger installations. Examples are drawn from integrated installations on existing or planned high-altitude aircraft.
Vehicle Support Posts Installation at Mobile Launcher
2017-05-11
Construction workers at the Mobile Launcher at NASA's Kennedy Space Center in Florida, prepare to install vehicle support posts. A total of eight support posts are being installed to support the load of the Space Launch System's (SLS) solid rocket boosters, with four posts for each of the boosters. The support posts are about five feet tall and each weigh about 10,000 pounds. The posts will structurally support the SLS rocket through T-0 and liftoff. The Ground Systems Development and Operations Program is overseeing installation of the support posts to prepare for the launch of the Orion spacecraft atop the SLS rocket.
1995-05-01
has been in operation for over 75 years with primary mission of research, development, and testing of munitions and military vehicles. A.s a...development, and testing of munitions and military vehicles. As a results of APG being on the National Priorities List, an installation-wide health...development, and testing of chemical warfare agents and conventional munitions. The installation occupies approximately 32,400 hectares of relatively
NASA Technical Reports Server (NTRS)
Bachtell, E. E.; Thiemet, W. F.; Morosow, G.
1987-01-01
To demonstrate the design and integration of a reflective mesh surface to a deployable truss structure, a mesh reflector was installed on a 15 foot box truss cube. The specific features demonstrated include: (1) sewing seams in reflective mesh; (2) mesh stretching to desired preload; (3) installation of surface tie cords; (4) installation of reflective surface on truss; (5) setting of reflective surface; (6) verification of surface shape/accuracy; (7) storage and deployment; (8) repeatability of reflector surface; and (9) comparison of surface with predicted shape using analytical methods developed under a previous task.
Diagnosis diagrams for passing signals on an automatic block signaling railway section
NASA Astrophysics Data System (ADS)
Spunei, E.; Piroi, I.; Chioncel, C. P.; Piroi, F.
2018-01-01
This work presents a diagnosis method for railway traffic security installations. More specifically, the authors present a series of diagnosis charts for passing signals on a railway block equipped with an automatic block signaling installation. These charts are based on the exploitation electric schemes, and are subsequently used to develop a diagnosis software package. The thus developed software package contributes substantially to a reduction of failure detection and remedy for these types of installation faults. The use of the software package eliminates making wrong decisions in the fault detection process, decisions that may result in longer remedy times and, sometimes, to railway traffic events.
NASA Technical Reports Server (NTRS)
Hall, D. S.
1980-01-01
A development program was developed to design and improve the Emergency Locator Transmitter (ELT) transmitter and to improve the installation in the aircraft and its activation subsystem. There were 1135 general aviation fixed wing aircraft accident files reviewed. A detailed description of the damage to the aircraft was produced. The search aspects of these accidents were studied. As much information as possible about the ELT units in these cases was collected. The data should assist in establishing installation and mounting criteria, better design standards for activation subsystems, and requirements for the new ELT system design in the area of crashworthiness.
Defending Against Biological and Chemical Attacks
2010-08-01
addition, we field integrated installation consequence management response capabilities to select installations both at home and abroad. Just as...decon- tamination, like self-decontaminating or strippable coat- ings for vehicles; we are developing technologies to focus decontamination on the
Performance of buried pipe installation : technical summary.
DOT National Transportation Integrated Search
2010-05-01
The goal of this research project was to determine the effects of geometric and mechanical parameters characterizing the soil-structure interaction developed in a buried pipe installation. Parameters such as pipe ring stiff ness, bedding thickness, t...
CUECost workbook development documentation
This is a user's manual for the Coal Utility Environmental Cost (CUECost) workbook to estimate installed capital and annualized costs. The CUECost workbook produces rough-order-of-magnitude (ROM) cost estimates (+/-30% accuracy) of the installed capital and annualized operating c...
NASA Astrophysics Data System (ADS)
Berta-Thompson, Zachory K.; Irwin, Jonathan; Charbonneau, David; Newton, Elisabeth R.; Dittmann, Jason
2014-06-01
The MEarth Project is an ongoing all-sky survey for Earth-like planets transiting the closest, smallest M dwarfs. MEarth aims to find good targets for atmospheric characterization with JWST and the next generation of enormous ground-based telescopes. MEarth's yearly data releases, containing precise light curves of nearby mid-to-late M dwarfs, provide a unique window into the photometric variability of the stars that will forever be among the most interesting targets in the search for potentially habitable exoplanets. We present a status update on the MEarth Project, including a detailed map of the progress we’ve made so far with 8 telescopes in the Northern hemisphere and promising early results from our new installation of 8 more telescopes in the Southern hemisphere.
NASA Astrophysics Data System (ADS)
Cordes, V.
1983-09-01
Three solar generator projects in developing countries are discussed. A brackish water desalination unit was developed and built. A 2.4 kW solar generator supplies the desalination unit which produces 1.5 cum drinking water per day, and the pump installed for a hoisting depth of 20 m. The unit switches on if the solar energy is sufficiently high; a 160 Ahr battery guarantees constant operation. A photovoltaically supplied UHF transmitter was installed. A 3.6 kW solar generator and a battery make transmitter and air traffic warning illumination self-sufficient. A small diesel generator is installed for emergency cases. Experience shows that solar generator (4 kW) and battery have to be enlarged. An emergency solar energy generator was installed in a hospital. The solar generator has a maximum power of 150 W; together with a battery it can deliver the energy for a minimum 5 hr of emergency illumination.
High-power CO laser with RF discharge for isotope separation employing condensation repression
NASA Astrophysics Data System (ADS)
Baranov, I. Ya.; Koptev, A. V.
2008-10-01
High-power CO laser can be the effective tool in such applications as isotope separation using the free-jet CRISLA method. The way of transfer from CO small-scale experimental installation to industrial high-power CO lasers is proposed through the use of a low-current radio-frequency (RF) electric discharge in a supersonic stream without an electron gun. The calculation model of scaling CO laser with RF discharge in supersonic stream was developed. The developed model allows to calculate parameters of laser installation and optimize them with the purpose of reception of high efficiency and low cost of installation as a whole. The technical decision of industrial CO laser for isotope separation employing condensation repression is considered. The estimated cost of laser is some hundred thousand dollars USA and small sizes of laser head give possibility to install it in any place.
Community Crowd-Funded Solar Finance
DOE Office of Scientific and Technical Information (OSTI.GOV)
Jagerson, Gordon "Ty"
The award supported the demonstration and development of the Village Power Platform, which enables community organizations to more readily develop, finance and operate solar installations on local community organizations. The platform enables partial or complete local ownership of the solar installation. The award specifically supported key features including financial modeling tools, community communications tools, crowdfunding mechanisms, a mobile app, and other critical features.
MR-guided focused ultrasound surgery, present and future
Schlesinger, David; Benedict, Stanley; Diederich, Chris; Gedroyc, Wladyslaw; Klibanov, Alexander; Larner, James
2013-01-01
MR-guided focused ultrasound surgery (MRgFUS) is a quickly developing technology with potential applications across a spectrum of indications traditionally within the domain of radiation oncology. Especially for applications where focal treatment is the preferred technique (for example, radiosurgery), MRgFUS has the potential to be a disruptive technology that could shift traditional patterns of care. While currently cleared in the United States for the noninvasive treatment of uterine fibroids and bone metastases, a wide range of clinical trials are currently underway, and the number of publications describing advances in MRgFUS is increasing. However, for MRgFUS to make the transition from a research curiosity to a clinical standard of care, a variety of challenges, technical, financial, clinical, and practical, must be overcome. This installment of the Vision 20/20 series examines the current status of MRgFUS, focusing on the hurdles the technology faces before it can cross over from a research technique to a standard fixture in the clinic. It then reviews current and near-term technical developments which may overcome these hurdles and allow MRgFUS to break through into clinical practice. PMID:23927296
First experiences with the LHC BLM sanity checks
NASA Astrophysics Data System (ADS)
Emery, J.; Dehning, B.; Effinger, E.; Nordt, A.; Sapinski, M. G.; Zamantzas, C.
2010-12-01
The reliability concerns have driven the design of the Large Hardron Collider (LHC) Beam Loss Monitoring (BLM) system from the early stage of the studies up to the present commissioning and the latest development of diagnostic tools. To protect the system against non-conformities, new ways of automatic checking have been developed and implemented. These checks are regularly and systematically executed by the LHC operation team to ensure that the system status is after each test "as good as new". The sanity checks are part of this strategy. They are testing the electrical part of the detectors (ionisation chamber or secondary emission detector), their cable connections to the front-end electronics, further connections to the back-end electronics and their ability to request a beam abort. During the installation and in the early commissioning phase, these checks have shown their ability to find also non-conformities caused by unexpected failure event scenarios. In every day operation, a non-conformity discovered by this check inhibits any further injections into the LHC until the check confirms the absence of non-conformities.
Role of non-fossil energy in meeting China's energy and climate target for 2020
DOE Office of Scientific and Technical Information (OSTI.GOV)
Zhou, Sheng; Tong, Qing; Yu, Sha
2012-12-01
China is the largest energy consumer and CO2 emitter in the world. The Chinese government faces growing challenges of ensuring energy security and reducing greenhouse gas emissions. To address these two issues, the Chinese government has announced two ambitious domestic indicative autonomous mitigation targets for 2020: increasing the ratio of non-fossil energy to 15% and reducing carbon dioxide emissions per unit of GDP by 40-45% from 2005 levels. To explore the role of non-fossil energy in achieving these two targets, this paper first provides an overview of current status of non-fossil energy development in China; then gives a brief reviewmore » of GDP and primary energy consumption; next assesses in detail the role of the non fossil energy in 2020, including the installed capacity and electricity generation of non-fossil energy sources, the share and role of non-fossil energy in the electricity structure, emissions reduction resulting from the shift to non-fossil energy, and challenges for accomplishing the mitigation targets in 2020 ; finally, conclusions and policy measures for non-fossil energy development are proposed.« less
Streetlight Control System Based on Wireless Communication over DALI Protocol
Bellido-Outeiriño, Francisco José; Quiles-Latorre, Francisco Javier; Moreno-Moreno, Carlos Diego; Flores-Arias, José María; Moreno-García, Isabel; Ortiz-López, Manuel
2016-01-01
Public lighting represents a large part of the energy consumption of towns and cities. Efficient management of public lighting can entail significant energy savings. This work presents a smart system for managing public lighting networks based on wireless communication and the DALI protocol. Wireless communication entails significant economic savings, as there is no need to install new wiring and visual impacts and damage to the facades of historical buildings in city centers are avoided. The DALI protocol uses bidirectional communication with the ballast, which allows its status to be controlled and monitored at all times. The novelty of this work is that it tackles all aspects related to the management of public lighting: a standard protocol, DALI, was selected to control the ballast, a wireless node based on the IEEE 802.15.4 standard with a DALI interface was designed, a network layer that considers the topology of the lighting network has been developed, and lastly, some user-friendly applications for the control and maintenance of the system by the technical crews of the different towns and cities have been developed. PMID:27128923
Research status of geothermal resources in China
NASA Astrophysics Data System (ADS)
Zhang, Lincheng; Li, Guang
2017-08-01
As the representative of the new green energy, geothermal resources are characterized by large reserve, wide distribution, cleanness and environmental protection, good stability, high utilization factor and other advantages. According to the characteristics of exploitation and utilization, they can be divided into high-temperature, medium-temperature and low-temperature geothermal resources. The abundant and widely distributed geothermal resources in China have a broad prospect for development. The medium and low temperature geothermal resources are broadly distributed in the continental crustal uplift and subsidence areas inside the plate, represented by the geothermal belt on the southeast coast, while the high temperature geothermal resources concentrate on Southern Tibet-Western Sichuan-Western Yunnan Geothermal Belt and Taiwan Geothermal Belt. Currently, the geothermal resources in China are mainly used for bathing, recuperation, heating and power generation. It is a country that directly makes maximum use of geothermal energy in the world. However, China’s geothermal power generation, including installed generating capacity and power generation capacity, are far behind those of Western European countries and the USA. Studies on exploitation and development of geothermal resources are still weak.
Development Status of Ion Source at J-PARC Linac Test Stand
NASA Astrophysics Data System (ADS)
Yamazaki, S.; Takagi, A.; Ikegami, K.; Ohkoshi, K.; Ueno, A.; Koizumi, I.; Oguri, H.
The Japan Proton Accelerator Research Complex (J-PARC) linac power upgrade program is now in progress in parallel with user operation. To realize a nominal performance of 1 MW at 3 GeV Rapid Cycling Synchrotron and 0.75 MW at the Main Ring synchrotron, we need to upgrade the peak beam current (50 mA) of the linac. For the upgrade program, we are testing a new front-end system, which comprises a cesiated RF-driven H- ion source and a new radio -frequency quadrupole linac (RFQ). The H- ion source was developed to satisfy the J-PARC upgrade requirements of an H- ion-beam current of 60 mA and a lifetime of more than 50 days. On February 6, 2014, the first 50 mA H- beams were accelerated by the RFQ during a beam test. To demonstrate the performance of the ion source before its installation in the summer of 2014, we tested the long-term stability through continuous beam operation, which included estimating the lifetime of the RF antenna and evaluating the cesium consumption.
Development and testing for physical security robots
NASA Astrophysics Data System (ADS)
Carroll, Daniel M.; Nguyen, Chinh; Everett, H. R.; Frederick, Brian
2005-05-01
The Mobile Detection Assessment Response System (MDARS) provides physical security for Department of Defense bases and depots using autonomous unmanned ground vehicles (UGVs) to patrol the site while operating payloads for intruder detection and assessment, barrier assessment, and product assessment. MDARS is in the System Development and Demonstration acquisition phase and is currently undergoing developmental testing including an Early User Appraisal (EUA) at the Hawthorne Army Depot, Nevada-the world's largest army depot. The Multiple Resource Host Architecture (MRHA) allows the human guard force to command and control several MDARS platforms simultaneously. The MRHA graphically displays video, map, and status for each resource using wireless digital communications for integrated data, video, and audio. Events are prioritized and the user is prompted with audio alerts and text instructions for alarms and warnings. The MRHA also interfaces to remote resources to automate legacy physical devices such as fence gate controls, garage doors, and remote power on/off capability for the MDARS patrol units. This paper provides an overview and history of the MDARS program and control station software with details on the installation and operation at Hawthorne Army Depot, including discussions on scenarios for EUA excursions. Special attention is given to the MDARS technical development strategy for spiral evolutions.
FY 1991 safety program status report
NASA Technical Reports Server (NTRS)
1991-01-01
In FY 1991, the NASA Safety Division continued efforts to enhance the quality and productivity of its safety oversight function. Recent initiatives set forth in areas such as training, risk management, safety assurance, operational safety, and safety information systems have matured into viable programs contributing to the safety and success of activities throughout the Agency. Efforts continued to develop a centralized intra-agency safety training program with establishment of the NASA Safety Training Center at the Johnson Space Center (JSC). The objective is to provide quality training for NASA employees and contractors on a broad range of safety-related topics. Courses developed by the Training Center will be presented at various NASA locations to minimize travel and reach the greatest number of people at the least cost. In FY 1991, as part of the ongoing efforts to enhance the total quality of NASA's safety work force, the Safety Training Center initiated development of a Certified Safety Professional review course. This course provides a comprehensive review of the skills and knowledge that well-rounded safety professionals must possess to qualify for professional certification. FY 1992 will see the course presented to NASA and contractor employees at all installations via the NASA Video Teleconference System.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Single family homes in urban areas that are available for renovation by nonprofit developers are often in rough shape (1MM to 2MM nationally). Budgeting has historically focused on improving homes to meet basic housing standards. A rising interest in the long-term impact of homeownership has introduced the need to balance basic needs with home performance. This demonstration project aims to help nonprofit affordable housing developers become familiar with three Building America performance measures, the installation processes, and impacts and benefits of each. A story and a half home in North Minneapolis, MN was presented by Urban Homeworks our local nonprofitmore » partner. The team helped them install three researched upgrade measures: exterior roof insulation or 'overcoat,' exterior foundation insulation, or 'excavationless', and a combined space and water heating HVAC system or 'combi'. To maximize efficiency of application and to address budget issues, the Team worked with Urban Homeworks to identify ways to use volunteers and construction training programs to install the measures. An open invitation to visit the job site was extended to other nonprofit developers and industry partners to encourage dialog about the systems during live installation.« less
24 CFR 3286.7 - Consumer information.
Code of Federal Regulations, 2010 CFR
2010-04-01
... URBAN DEVELOPMENT MANUFACTURED HOME INSTALLATION PROGRAM Generally Applicable Provisions and... recommendation that any home that has been reinstalled after its original installation should be inspected after... manufactured home, the retailer must provide the purchaser or lessee with a consumer disclosure. This...
Geothermal Energy: Prospects and Problems
ERIC Educational Resources Information Center
Ritter, William W.
1973-01-01
An examination of geothermal energy as a means of increasing the United States power resources with minimal pollution problems. Developed and planned geothermal-electric power installations around the world, capacities, installation dates, etc., are reviewed. Environmental impact, problems, etc. are discussed. (LK)
Installation of warm mix asphalt projects in Virginia.
DOT National Transportation Integrated Search
2007-01-01
Several processes have been developed to reduce the mixing and compaction temperatures of hot mix asphalt (HMA) without sacrificing the quality of the resulting pavement. The purpose of this study was to evaluate the installation of warm mix asphalt ...
Intermediate load-center photovoltaic application experiments
DOE Office of Scientific and Technical Information (OSTI.GOV)
Burgess, E. L.
1980-01-01
A total of nine intermediate load-center photovoltaic systems were carried into the construction phase this year. These nine systems range in size from 20 to 225 kW/sub p/ electrical output and total almost 1 MW/sub p/. They are being installed in a diverse set of applications and locations and represent the bulk of the photovoltaic initial system evaluation experiments (ISEE) for the intermediate load-center sector. Each of these experiments are briefly described and the status of the construction phase is given for each project.
Measuring the Cosmic Particle Radiation from electrons to actinides - CALET
NASA Astrophysics Data System (ADS)
Mitchell, John; Calet Collaboration; Hnx/Tigeriss Collaboration
2017-01-01
CALET (Calorimetric Electron Telescope) was installed on the Exposed Facility of the Japanese Experiment Module (Kibo) on for 24 August 2015. CALET measures the high-energy spectra of electrons, nuclei, and gamma-rays. CALET will extend direct measurements of the total electron spectrum into the trans-TeV energy range for the first time. In this paper, we well present the science and current status of CALET and initial observations from its first 1.5 years in orbit.
Feasibility Study of Food Waste Co-Digestion at U.S. Army Installations
2017-03-01
systems, • energy take off, • gas flare, and • gas generator sets or turbines . Costs for individual items outlined in Table 5 were collected from...unlike other forms of renewables such as wind or solar. In addition, biogas—a product of the AD process—is a versatile energy resource that can be...Huachuca DPW. San Diego, CA: All Star Technical Services. Arsova, L. May 2010. Anaerobic Digestion of Food Waste: Current Status, Problems , and an
Habitat Fragmentation Handbook for Installation Planners: Status and Options
2006-12-01
gray bat, Indiana bat) • shrub cover and nectar corridors (lesser long-nosed bat) • “fragmented places” (brown-headed cowbird). NLCD data was created...golden-cheeked warbler: 86.9%, 65.7%, & 65.9%. For gray bat and Indiana bat: 90.2%, 85.2%, & 75.5%. Woody wetland (91) For gray bat and Indiana bat...should be all grasses and shrubs (50s and 70s) cells adjacent to forest (40s) or woody wetlands (91). With- out a spatial data uncertainty model
SESAME: an opportunity for science in the Middle-East
NASA Astrophysics Data System (ADS)
Paolucci, Giorgio
SESAME, the Synchrotron Radiation Laboratory of the Middle East, is becoming reality. As of November 2016, the injector has been commissioned, the storage ring is in an advanced state of installation and it is expected that two beamlines (XAFS/XRF and IR) will start producing scientific results in 2017. The talk will present the status of the facility and will illustrate its scientific objectives. The expected social and cultural impact of the project in the tumultuous Middle East Region will also be highlighted.
Drop-In Alternative Jet Fuels: Status of DoDs RDT and E, Interagency Initiatives, and Policies
2015-08-25
biodiesel , EVs, natural gas Drivers: Compliance and cost Market penetration: % of fuel use 3 INSTALLATIONS (COMPLIANCE) Military...including pure biodiesel (B100))1 – P‐Series.2 4 Why does DoD Care about “Drop‐in” Alternative Fuels for Operational Platforms? • Fuels for operations make
Refurbishment of durban fixed ukzn lidar for atmospheric studies - current status
NASA Astrophysics Data System (ADS)
Sivakumar, Venkataraman
2018-04-01
The fixed LIDAR system at University of KwaZulu-Natal (UKZN) in Durban was installed in 1999 and operated until 2004. In 2004, the system was relocated and operation closed due to various technical and instrument problems. The restructuring of the LIDAR system was initiated in 2013 and it is now used to measure vertical aerosol profiles in the height range 03-25 km. Here, we describe the present system in detail, including technical specifications and results obtained from a recent LIDAR calibration campaign.
2014-02-01
installation based on a Euclidean distance allocation and assigned that installation’s threshold values. The second approach used a thin - plate spline ...installation critical nLS+ thresholds involved spatial interpolation. A thin - plate spline radial basis functions (RBF) was selected as the...the interpolation of installation results using a thin - plate spline radial basis function technique. 6.5 OBJECTIVE #5: DEVELOP AND
DOE Office of Scientific and Technical Information (OSTI.GOV)
Wohlgemuth, John; Silverman, Timothy; Miller, David C.
This paper describes an effort to inspect and evaluate PV modules in order to determine what failure or degradation modes are occurring in field installations. This paper will report on the results of six site visits, including the Sacramento Municipal Utility District (SMUD) Hedge Array, Tucson Electric Power (TEP) Springerville, Central Florida Utility, Florida Solar Energy Center (FSEC), the TEP Solar Test Yard, and University of Toledo installations. The effort here makes use of a recently developed field inspection data collection protocol, and the results were input into a corresponding database. The results of this work have also been usedmore » to develop a draft of the IEC standard for climate and application specific accelerated stress testing beyond module qualification. TEP Solar Test Yard, and University of Toledo installations. The effort here makes use of a recently developed field inspection data collection protocol, and the results were input into a corresponding database. The results of this work have also been used to develop a draft of the IEC standard for climate and application specific accelerated stress testing beyond module qualification. TEP Solar Test Yard, and University of Toledo installations. The effort here makes use of a recently developed field inspection data collection protocol, and the results were input into a corresponding database. The results of this work have also been used to develop a draft of the IEC standard for climate and application specific accelerated stress testing beyond module qualification.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Murray, Robert C.
Following the January 1980 earthquake that was felt at Lawrence Livermore National Laboratory (LLNL), a network of strong-motion accelerographs was installed at LLNL. Prior to the 1980 earthquake, there were no accelerographs installed. The ground motion from the 1980 earthquake was estimated from USGS instruments around the Laboratory to be between 0.2 – 0.3 g horizontal peak ground acceleration. These instruments were located at the Veterans Hospital, 5 miles southwest of LLNL, and in San Ramon, about 12 miles west of LLNL. In 2011, the Department of Energy (DOE) requested to know the status of our seismic instruments. We conductedmore » a survey of our instrumentation systems and responded to DOE in a letter. During this survey, it was found that the recorders in Buildings 111 and 332 were not operational. The instruments on Nova had been removed, and only three of the 10 NIF instruments installed in 2005 were operational (two were damaged and five had been removed from operation at the request of the program). After the survey, it was clear that the site seismic instrumentation had degraded substantially and would benefit from an overhaul and more attention to ongoing maintenance. LLNL management decided to update the LLNL seismic instrumentation system. The updated system is documented in this report.« less
Vehicle Support Posts Installation onto Mobile Launcher
2017-05-11
Construction workers on the deck of the mobile launcher prepare the platforms for installation of vehicle support posts at NASA's Kennedy Space Center in Florida. At left, four of the support posts are installed. A total of eight support posts will be installed to support the load of the Space Launch System's (SLS) solid rocket boosters, with four posts for each of the boosters. The support posts are about five feet tall and each weigh about 10,000 pounds. The posts will structurally support the SLS rocket through T-0 and liftoff, and will drop down before vehicle liftoff to avoid contact with the flight hardware. The Ground Systems Development and Operations Program is overseeing installation of the support posts to prepare for the launch of the Orion spacecraft atop the SLS rocket.
NASA Astrophysics Data System (ADS)
Lee, Dong Hyuk; Kim, JongHyo; Kim, Hee C.; Lee, Yong W.; Min, Byong Goo
1997-04-01
There have been a number of studies on the quantitative evaluation of diffuse liver disease by using texture analysis technique. However, the previous studies have been focused on the classification between only normal and abnormal pattern based on textural properties, resulting in lack of clinically useful information about the progressive status of liver disease. Considering our collaborative research experience with clinical experts, we judged that not only texture information but also several shape properties are necessary in order to successfully classify between various states of disease with liver ultrasonogram. Nine image parameters were selected experimentally. One of these was texture parameter and others were shape parameters measured as length, area and curvature. We have developed a neural-net algorithm that classifies liver ultrasonogram into 9 categories of liver disease: 3 main category and 3 sub-steps for each. Nine parameters were collected semi- automatically from the user by using graphical user interface tool, and then processed to give a grade for each parameter. Classifying algorithm consists of two steps. At the first step, each parameter was graded into pre-defined levels using neural network. in the next step, neural network classifier determined disease status using graded nine parameters. We implemented a PC based computer-assist diagnosis workstation and installed it in radiology department of Seoul National University Hospital. Using this workstation we collected 662 cases during 6 months. Some of these were used for training and others were used for evaluating accuracy of the developed algorithm. As a conclusion, a liver ultrasonogram classifying algorithm was developed using both texture and shape parameters and neural network classifier. Preliminary results indicate that the proposed algorithm is useful for evaluation of diffuse liver disease.
2016-10-19
Inside the Vehicle Assembly Building at NASA’s Kennedy Space Center in Florida, the first half of the C-level work platforms, C south, for NASA’s Space Launch System (SLS) rocket, has been installed on the south side of the high bay. In view below are several levels of previously installed platforms. The C platforms are the eighth of 10 levels of work platforms that will surround and provide access to the SLS rocket and Orion spacecraft for Exploration Mission 1. The Ground Systems Development and Operations Program is overseeing upgrades and modifications to VAB High Bay 3, including installation of the new work platforms, to prepare for NASA’s Journey to Mars.
24 CFR 3286.9 - Manufacturer shipment responsibilities.
Code of Federal Regulations, 2010 CFR
2010-04-01
... instructions. The manufacturer is required to provide with each manufactured home, installation designs and... HOUSING AND URBAN DEVELOPMENT MANUFACTURED HOME INSTALLATION PROGRAM Generally Applicable Provisions and... the time that each manufactured home is shipped by a manufacturer, the manufacturer must provide HUD...
Vegetation and other development options for mitigating urban air pollution impacts
In addition to installing air pollution control devices and reducing emissions activities, urban air pollution can be further mitigated through planning and design strategies including vegetation planting, building design, installing roadside and near source structures, and modif...
Installation and performance of lightweight aggregate asphaltic concrete test sections.
DOT National Transportation Integrated Search
1970-01-01
In 1966 and 1968 test sections of asphaltic concrete overlays fabricated with coarse lightweight aggregate and fine limestone were installed in the Roanoke-Bedford area. The experimental mixes used were designed in an attempt to develop skid resistan...
Performance evaluation of buried pipe installation : LTRC research project capsule 08-6GT.
DOT National Transportation Integrated Search
2008-03-01
The Louisiana Department of : Transportation and Development : (LADOTD) is in the process of revising : the current specifications to obtain a : more cost efficient design and : installation of buried pipes for highway : infrastructure. It aims to de...
DEVELOPMENT OF REMOTE HANFORD CONNECTOR GASKET REPLACEMENT TOOLING FOR DWPF
DOE Office of Scientific and Technical Information (OSTI.GOV)
Krementz, D.; Coughlin, Jeffrey
2009-05-05
The Defense Waste Processing Facility (DWPF) requested the Savannah River National Laboratory (SRNL) to develop tooling and equipment to remotely replace gaskets in mechanical Hanford connectors to reduce personnel radiation exposure as compared to the current hands-on method. It is also expected that radiation levels will continually increase with future waste streams. The equipment is operated in the Remote Equipment Decontamination Cell (REDC), which is equipped with compressed air, two master-slave manipulators (MSM's) and an electro-mechanical manipulator (EMM) arm for operation of the remote tools. The REDC does not provide access to electrical power, so the equipment must be manuallymore » or pneumatically operated. The MSM's have a load limit at full extension of ten pounds, which limited the weight of the installation tool. In order to remotely replace Hanford connector gaskets several operations must be performed remotely, these include: removal of the spent gasket and retaining ring (retaining ring is also called snap ring), loading the new snap ring and gasket into the installation tool and installation of the new gasket into the Hanford connector. SRNL developed and tested tools that successfully perform all of the necessary tasks. Removal of snap rings from horizontal and vertical connectors is performed by separate air actuated retaining ring removal tools and is manipulated in the cell by the MSM. In order install a new gasket, the snap ring loader is used to load a new snap ring into a groove in the gasket installation tool. A new gasket is placed on the installation tool and retained by custom springs. An MSM lifts the installation tool and presses the mounted gasket against the connector block. Once the installation tool is in position, the gasket and snap ring are installed onto the connector by pneumatic actuation. All of the tools are located on a custom work table with a pneumatic valve station that directs compressed air to the desired tool and vents the tools as needed. Extensive testing of tooling operation was performed in the DWPF manipulator repair shop. This testing allowed the operators to gain confidence before the equipment was exposed to radioactive contamination. The testing also led to multiple design improvements. On July 17 and 29, 2008 the Remote Gasket Replacement Tooling was successfully demonstrated in the REDC at the DWPF of The Savannah River Site.« less
2016 End of the year South Carolina PV soft cost and workforce development
DOE Office of Scientific and Technical Information (OSTI.GOV)
Fox, Elise B.; Edwards, Thomas B.; Drory, Michael D.
2017-08-16
A solar industry survey was given to professional installers who serve the South Carolina market in order to determine trends in costing, work force needs, and business demographics at the end of 2016. It was found that 70% of the respondents serve the residential sector, while only 7% of the total exclusively serves the residential market. The average size of residential installations remain near 9 kW-DC, while the average size of commercial and utility scale installations continue to grow to 378 kW-DC and 14.8 MW-DC, respectively. The total cost of these residential systems has hovered around $3.50/W-DC since the endmore » of 2015, while commercial installations have dropped to $2.45/W-DC and utility scale installations have dropped to $1.49/W-DC. It is expected that the cost of utility scale installations will continue to drop as there are publically reported utility scale installations with contracted PPAs for less than 4¢/kWh. 52-60% of the cost is associated with hardware only depending upon sector.« less
NASA Astrophysics Data System (ADS)
Kaplan, J. I.
1980-11-01
The work effort to design, build, install, and evaluate an inside storm window (ISW) is presented. The ISW, made of two separated layers of mylar (like a thermopane window) which, when not in use can be rolled up in a shade, is described. The work effort included: development of a prototype model; the development of production facilities to turn out a small number (50) of ISW's; the production of the windows; the installation of the windows into buildings; the building of a test chamber to determine the R value of the ISW and the subsequent determination of the R value; and a survey to determine how the residents of the homes in which ISW's were installed felt about the windows.
2017-07-01
ER D C/ CE RL T R- 17 -2 5 Army Environmental Quality Technology An Evaluation of Methods for Assessing Vulnerability of Army...Evaluation of Methods for Assessing Vulnerability of Army Installations to Impacts of Climate Change on Listed and At-Risk Species Matthew G. Hohmann...their suitability for informing BRAC-related evaluations. Three recently developed methods for assessing the vulnerability of Army installations to
NASA Astrophysics Data System (ADS)
Jung, Do Yang; Lee, Baek Haeng; Kim, Sun Wook
Electric vehicle (EV) performance is very dependent on traction batteries. For developing electric vehicles with high performance and good reliability, the traction batteries have to be managed to obtain maximum performance under various operating conditions. Enhancement of battery performance can be accomplished by implementing a battery management system (BMS) that plays an important role in optimizing the control mechanism of charge and discharge of the batteries as well as monitoring the battery status. In this study, a BMS has been developed for maximizing the use of Ni-MH batteries in electric vehicles. This system performs several tasks: the control of charging and discharging, overcharge and over-discharge protection, the calculation and display of state-of-charge (SOC), safety, and thermal management. The BMS is installed in and tested in a DEV5-5 electric vehicle developed by Daewoo Motor Co. and the Institute for Advanced Engineering in Korea. Eighteen modules of a Panasonic nickel-metal hydride (Ni-MH) battery, 12 V, 95 A h, are used in the DEV5-5. High accuracy within a range of 3% and good reliability are obtained. The BMS can also improve the performance and cycle-life of the Ni-MH battery peak, as well as the reliability and the safety of the electric vehicles.
24 CFR 3285.502 - Expanding rooms.
Code of Federal Regulations, 2010 CFR
2010-04-01
... DEVELOPMENT MODEL MANUFACTURED HOME INSTALLATION STANDARDS Optional Features § 3285.502 Expanding rooms. The support and anchoring systems for expanding rooms must be installed in accordance with designs provided by the home manufacturer or prepared by a registered professional engineer or registered architect, in...
Solar Energy Installers Curriculum Guides. Final Report.
ERIC Educational Resources Information Center
Walker, Gene C.
A project was conducted to develop solar energy installers curriculum guides for use in high school vocational centers and community colleges. Project activities included researching job competencies for the heating, ventilation, and air conditioning industry and determining through interviews and manufacturers' literature what additional…
Startup Notification Report 3rd Quarter FY17.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Freeman, Roger D.; Petti, Jason P.
2017-11-01
This activity is being revised based on the November 2016 Project Plan and Installation Plan. These documents were developed and issued due to a change in the design responsibilities, assigned project personnel and the change in the installation of the RCS subsystems.
DOT National Transportation Integrated Search
2016-09-01
The objectives of this study are to develop and deploy a means for cost-effectively extracting curve information using the widely available GPS and GIS data to support high friction surface treatment (HFST) installation recommendations (i.e., start a...
DOT National Transportation Integrated Search
2015-11-01
Several national standards and specification have been developed for design, installation, : and materials for precast concrete pipe, corrugated metal pipe, and HDPE pipes. However, : no national accepted installation standard or design method is ava...
32 CFR 700.325 - The Assistant Secretary of the Navy (Installations and Environment).
Code of Federal Regulations, 2011 CFR
2011-07-01
... Secretary of the Navy (Installations and Environment) is responsible for: (a) Policy relating to Navy...) Development, implementation and evaluation of military construction, facilities management and engineering, strategic homeporting, housing, utilities, and base utilization issues; (c) Environmental policy, safety...
Implementing ARFORGEN: Installation Capability and Feasibility Study of Meeting ARFORGEN Guidelines
2007-07-26
aligning troop requirements with the Army’s new strategic mission, the force stabilization element of ARFORGEN was developed to raise the morale of...a discrete event simulation model developed for the project to mirror the reset process. The Unit Reset model is implemented in Java as a discrete...and transportation. Further, the typical installation support staff is manned by a Table of Distribution and Allowance ( TDA ) designed to
Preliminary design package for maxi-therm heat exchanger module
NASA Technical Reports Server (NTRS)
1978-01-01
Heat exchangers were developed for use in a solar heating and cooling system installed in a single family dwelling. Each of the three exchangers consisted of a heating and cooling module and a submersed electric water heating element. Information necessary to evaluate the preliminary design of the heat exchanger is presented in terms of the development and verification plans, performance specifications, installation and maintenance, and hazard analysis.
Environmental Assessment of Installation Development at McConnell Air Force Base, Kansas
2012-12-01
potential for these species to occur on the installation. Despite the lack of suitable habitat for residency or breeding, four federally listed birds ... species or suitable habitat at McConnell AFB. Environmental protection measures would be implemented to minimize impacts on migratory birds as...the DBA, and measures developed to avoid impacts to migratory bird species , and their habitats during tlle jmplementation of all aspects of this
Increasing smoke alarm operability through theory-based health education: a randomised trial.
Miller, Ted R; Bergen, Gwen; Ballesteros, Michael F; Bhattacharya, Soma; Gielen, Andrea Carlson; Sheppard, Monique S
2014-12-01
Although working smoke alarms halve deaths in residential fires, many households do not keep alarms operational. We tested whether theory-based education increases alarm operability. Randomised multiarm trial, with a single arm randomly selected for use each day, in low-income neighbourhoods in Maryland, USA. Intervention arms: (1) Full Education combining a health belief module with a social-cognitive theory module that provided hands-on practice installing alarm batteries and using the alarm's hush button; (2) Hands-on Practice social-cognitive module supplemented by typical fire department education; (3) Current Norm receiving typical fire department education only. Four hundred and thirty-six homes recruited through churches or by knocking on doors in 2005-2008. Follow-up visits checked alarm operability in 370 homes (85%) 1-3.5 years after installation. number of homes with working alarms defined as alarms with working batteries or hard-wired and number of working alarms per home. Regressions controlled for alarm status preintervention; demographics and beliefs about fire risks and alarm effectiveness. Homes in the Full Education and Practice arms were more likely to have a functioning smoke alarm at follow-up (OR=2.77, 95% CI 1.09 to 7.03) and had an average of 0.32 more working alarms per home (95% CI 0.09 to 0.56). Working alarms per home rose 16%. Full Education and Practice had similar effectiveness (p=0.97 on both outcome measures). Without exceeding typical fire department installation time, installers can achieve greater smoke alarm operability. Hands-on practice is key. Two years after installation, for every three homes that received hands-on practice, one had an additional working alarm. http://www.clinicaltrials.gov number NCT00139126. Published by the BMJ Publishing Group Limited. For permission to use (where not already granted under a licence) please go to http://group.bmj.com/group/rights-licensing/permissions.
Gao, Junhong; Wan, Hong; Kong, Wei; Yue, Hong
2012-01-01
To provide a suitable vehicle-mounted installation to solve the problem of drinking water in the wild. The vehicle-mounted drinking water installation, made up of pre-treatment unit, purification unit, box and VECU, was used to storage, transport and purify water in the wild. The effect of purification was detected by assembling the installation in the wild and observing the change of water turbidity, TDS, the number of total bacteria and coliform bacteria before and after the treatment of water sources. The wild water sources, such as river water, rainwater, well water and spring water could be purified, and the quality of the treated water could meet the requirement of Drinking Water Quality Standard of CJ94-2005. The vehicle-mounted drinking water installation is suitable for purifying water sources in the wild for drinking use.
Straight talk. New approaches in healthcare.
Lanier, Jack; Loudermilk, Kerry; Skogsbergh, Jim; Clark, Reatha; Friz, Robert; Lopez, Fawn
2005-11-07
Not-for-profit health systems are under the public microscope. Sen. Charles Grassley, (D-Iowa) chairman of the Senate Finance Committee, has been critical of the charity care and billing practices of not-for-profit health systems, and vows to introduce legislation to correct abuses throughout the tax-exempt sector. The House has studied the issue as well. Not-for-profit health systems also have been accused in hundreds of lawsuits of overcharging uninsured patients and aggressively pursuing debt collection. In this installment of Straight Talk, we explore the issues surrounding tax-exempt status and how health systems should publicize their charitable work. Modern Healthcare and PricewaterhouseCoopers present Straight Talk. The session on charity care and tax-exempt status was held on October 4, 2005 at Modern Healthcare's Chicago headquarters. Fawn Lopez, publisher of Modern Healthcare, was the moderator.
ACTPol: Status and preliminary CMB polarization results from the Atacama Cosmology Telescope
NASA Astrophysics Data System (ADS)
Koopman, Brian
2014-03-01
The Atacama Cosmology Telescope Polarimeter (ACTPol) is a polarization sensitive upgrade for the Atacama Cosmology Telescope, located at an elevation of 5190 m on Cerro Toco in Chile. In summer 2013, ACTPol achieved first light with one third of the final detector configuration. The remaining two thirds of the detector array will be installed during spring 2014, enabling full sensitivity, high resolution, observations at both 90 GHz and 150 GHz. Using approximately 3,000 transition-edge sensor bolometers, ACTPol will enable measurements of small angular scale polarization anisotropies in the Cosmic Microwave Background (CMB). I will present a status update for the ACTPol receiver and some preliminary results. ACTPol measurements will allow us to probe the spectral index of inflation as well as to constrain early dark energy and the sum of neutrino masses.
Mielke, U; Schneemilch, N
1991-01-01
A total of 23 maternity centres and 8 youth welfare centres in the county town of Magdeburg were inspected in 1987 and 1988 to review the condition of buildings and layout of rooms. Checks were also made on anti-infectious routines and compliance with the vaccination regulations. In all of these areas a number of deficiencies were found, and the results of follow-up inspections clearly show that the attention being given to public health regulations for sterilization and disinfection and to the storage of vaccines, is still inadequate. Urgent action is also required to improve conditions which are beyond the control of staff, such as buildings in need of repair, lack of space and the installation of washbasins, toilets, etc.
NASA Technical Reports Server (NTRS)
1981-01-01
Relevant differences between the MPPM resident IBM 370computer and the NASA Sigma 9 computer are described as well as the MPPM system itself and its development. Problems encountered and solutions used to overcome these difficulties during installation of the MPPM system at MSFC are discussed. Remaining work on the installation effort is summarized. The relevant hardware features incorporated in the program are described and their implications on the transportability of the MPPM source code are examined.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Greene, J.A.
1991-06-01
A groundwater quality monitoring well installation program was conducted at Oak Ridge National Laboratory (ORNL) to meet the requirements of environmental regulations, including the Resource Conservation and Recovery Act (RCRA) and the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA). A total of 173 wells were installed and developed at 11 different waste area groupings (WAGs) between June 1986 and November 1990. A location map of the wells is included.
Pavlovich, Mark; Greene, Brandon F.
1984-01-01
In this study, we describe the development and evaluation of a self-instructional program for installing 10 low-cost/no-cost weatherization materials (e.g., weatherstripping, caulking). This program was a weatherization and retrofit manual (WARM) providing step-by-step instructions and illustrations. Boy and Girl Scouts participated and used either the WARM or existing product instructions (EPI) to apply the materials. Scouts installed the materials properly only when they used the WARM. PMID:16795671
Evaluation of a pilot installation of an energy absorbing bridge rail.
DOT National Transportation Integrated Search
1978-01-01
A newly developed bridge rail which uses steel rings that collapse or deform to absorb the energy of an impacting vehicle was retrofitted to the concrete parapet of an existing interstate highway bridge. It was planned that the installation would be ...
24 CFR 3285.302 - Flood hazard areas.
Code of Federal Regulations, 2010 CFR
2010-04-01
... loads associated with design flood and wind events or combined wind and flood events, and homes must be installed on foundation supports that are designed and anchored to prevent floatation, collapse, or lateral... URBAN DEVELOPMENT MODEL MANUFACTURED HOME INSTALLATION STANDARDS Foundations § 3285.302 Flood hazard...
24 CFR 3285.601 - Field assembly.
Code of Federal Regulations, 2010 CFR
2010-04-01
... parts that are necessary to join all sections of the home and are designed to be located underneath the home. The installation instructions must be designed in accordance with applicable requirements of part... DEVELOPMENT MODEL MANUFACTURED HOME INSTALLATION STANDARDS Ductwork and Plumbing and Fuel Supply Systems...
24 CFR 3285.604 - Drainage system.
Code of Federal Regulations, 2010 CFR
2010-04-01
... require drainage system crossover connections to join all sections of the home. The crossover design... all sections of the home and designed to be located underneath the home, they must be installed and... DEVELOPMENT MODEL MANUFACTURED HOME INSTALLATION STANDARDS Ductwork and Plumbing and Fuel Supply Systems...
AVOSS Windline at Dallas/Ft. Worth Airport Volume 1 Installation and Operation
DOT National Transportation Integrated Search
2001-05-01
A 259-meter windline, with horizontal and vertical single-axis anemometers mounted on 9-meter poles, was installed at the Dallas/Ft. Worth Airport under the approach to Runway 17C, as part of NASA's Aircraft Vortex Spacing System (AVOSS) development ...
24 CFR 3285.402 - Ground anchor installations.
Code of Federal Regulations, 2010 CFR
2010-04-01
... HOUSING AND URBAN DEVELOPMENT MODEL MANUFACTURED HOME INSTALLATION STANDARDS Anchorage Against Wind § 3285... conforming to ASTM D 3953—97, Standard Specification for Strapping, Flat Steel and Seals (incorporated by... in ASTM D 3953-97, Standard Specification for Strapping, Flat Steel and Seals (incorporated by...
24 CFR 3285.402 - Ground anchor installations.
Code of Federal Regulations, 2012 CFR
2012-04-01
... HOUSING AND URBAN DEVELOPMENT MODEL MANUFACTURED HOME INSTALLATION STANDARDS Anchorage Against Wind § 3285... conforming to ASTM D 3953—97, Standard Specification for Strapping, Flat Steel and Seals (incorporated by... in ASTM D 3953-97, Standard Specification for Strapping, Flat Steel and Seals (incorporated by...
DOT National Transportation Integrated Search
2009-03-01
This project was an implementation of research conducted under TxDOT Research Project 0-4124 on the use : of post-installed shear connectors to develop composite action in existing non-composite steel bridge girder : systems. In this implementation s...
NASA Technical Reports Server (NTRS)
Navaneethan, R.; Hunt, J.; Quayle, B.
1982-01-01
Tests were carried out on 20 inch x 20 inch panels at different test conditions using free-free panels, clamped panels, and panels as installed in the KU-FRL acoustic test facility. Tests with free-free panels verified the basic equipment set-up and test procedure. They also provided a basis for comparison. The results indicate that the effect of installed panels is to increase the damping ratio at the same frequency. However, a direct comparison is not possible, as the fundamental frequency of a free-free panel differs from the resonance frequency of the panel when installed. The damping values of panels installed in the test facility are closer to the damping values obtained with fixed-fixed panels. Effects of damping tape, stiffeners, and bonded and riveted edged conditions were also investigated. Progress in the development of a simple interior noise level control program is reported.
O’Shaughnessy, Eric; Nemet, Gregory F.; Darghouth, Naïm
2018-01-30
The solar photovoltaic (PV) installation industry comprises thousands of firms around the world who collectively installed nearly 200 million panels in 2015. Spatial analysis of the emerging industry has received considerable attention from the literature, especially on the demand side concerning peer effects and adopter clustering. However this research area does not include similarly sophisticated spatial analysis on the supply side of the installation industry. The lack of understanding of the spatial structure of the PV installation industry leaves PV market research to rely on jurisdictional lines, such as counties, to define geographic PV markets. We develop an approach thatmore » uses the spatial distribution of installers' activity to define geographic boundaries for PV markets. Our method is useful for PV market research and applicable in the contexts of other industries. We use our approach to demonstrate that the PV industry in the United States is spatially heterogeneous. Despite the emergence of some national-scale PV installers, installers are largely local and installer communities are unique from one region to the next. The social implications of the spatial heterogeneity of the emerging PV industry involve improving understanding of issues such as market power, industry consolidation, and how much choice potential adopters have.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
O’Shaughnessy, Eric; Nemet, Gregory F.; Darghouth, Naïm
The solar photovoltaic (PV) installation industry comprises thousands of firms around the world who collectively installed nearly 200 million panels in 2015. Spatial analysis of the emerging industry has received considerable attention from the literature, especially on the demand side concerning peer effects and adopter clustering. However this research area does not include similarly sophisticated spatial analysis on the supply side of the installation industry. The lack of understanding of the spatial structure of the PV installation industry leaves PV market research to rely on jurisdictional lines, such as counties, to define geographic PV markets. We develop an approach thatmore » uses the spatial distribution of installers' activity to define geographic boundaries for PV markets. Our method is useful for PV market research and applicable in the contexts of other industries. We use our approach to demonstrate that the PV industry in the United States is spatially heterogeneous. Despite the emergence of some national-scale PV installers, installers are largely local and installer communities are unique from one region to the next. The social implications of the spatial heterogeneity of the emerging PV industry involve improving understanding of issues such as market power, industry consolidation, and how much choice potential adopters have.« less
Chewing ability, nutritional status and quality of life.
Lee, I-C; Yang, Y-H; Ho, P-S; Lee, I-C
2014-02-01
In the literature, most researchers evaluate individuals' nutritional status and chewing ability by types of foods chosen or blood test. However, most of previous researches enrolled small sample size and the results might be influenced by personal preference of foods as well as the individuals' response to invasive examination. In this study, researchers assessed individuals' nutritional status and chewing ability with non-invasive test and excluded the personal preference of foods. This study had two aims: first, to explore associations between chewing ability, edentulous or dentulous, self-perceived oral health and individuals' nutritional status and quality of life; second, to assess whether the association proposed by Locker's model is valid. This study used the database of Phase I 'Publicly-funded Denture Installation Plan for the Elderly' of Kaohsiung City Government. Nine hundred and fifty-four subjects aged 65 years and older completed the questionnaires for data analysis. The research results supported and verified the theoretical model proposed by Locker. Individual's chewing ability associated significantly with his/her nutritional status and quality of life. The results demonstrated that better chewing ability of the elderly leads to better nutritional status and quality of life. The appropriateness of the indicators and measurements of individual's chewing ability and nutritional status used in this study has been evaluated and presented. These indicators and measurements are suggested to be generally used for clinical or research application on future-related issues. Consequently, the maintenance or improvement in the chewing ability of the elderly is extremely beneficial to healthy ageing. © 2013 John Wiley & Sons Ltd.
Vehicle Support Posts Installation onto Mobile Launcher
2017-05-11
Four vehicle support posts have been installed on the deck of the mobile launcher at NASA's Kennedy Space Center in Florida. A total of eight support posts will be installed to support the load of the Space Launch System's (SLS) solid rocket boosters, with four posts for each of the boosters. The support posts are about five feet tall and each weigh about 10,000 pounds. The posts will structurally support the SLS rocket through T-0 and liftoff, and will drop down before vehicle liftoff to avoid contact with the flight hardware. The Ground Systems Development and Operations Program is overseeing installation of the support posts to prepare for the launch of the Orion spacecraft atop the SLS rocket.
2016-10-19
A heavy-lift crane lowers the first half of the C-level work platforms, C south, for NASA’s Space Launch System (SLS) rocket, for installation on the south side of High Bay 3 in the Vehicle Assembly Building (VAB) at NASA’s Kennedy Space Center in Florida. The C platforms are the eighth of 10 levels of work platforms that will surround and provide access to the SLS rocket and Orion spacecraft for Exploration Mission 1. In view below Platform C are several of the previously installed platforms. The Ground Systems Development and Operations Program is overseeing upgrades and modifications to VAB High Bay 3, including installation of the new work platforms, to prepare for NASA’s Journey to Mars.